Queensland Building and Construction Commission Regulation 2018

Queensland Building and Construction Commission Regulation 2018 SL No. 138

notfd 31 August 2018

ss 1–2 comm on date of notification

pt 1 hdg, pts 2–10, schs 1–9 comm 1 September 2018 (see s 2)

exp 1 September 2028 (see SIA s 54)

Note—The expiry date may have changed since this reprint was published. See the latest reprint of the SIR for any change.

Building Industry Fairness (Security of Payment) and Other Legislation Amendment Regulation 2018 SL No. 177

notfd 09 November 2018

pts 2 divs 1–2, 3–4 comm 17 December 2018 (see s 2 (2))

Queensland Building and Construction Commission (Minimum Financial Requirements) Regulation 2018 SL No. 218

notfd 14 December 2018

pts 1 (other than ss 1–2), 2–6, sch 1 comm 1 January 2019 (see s 2)

Queensland Building and Construction Commission (Minimum Financial Requirements) and Other Legislation Amendment Regulation 2019 SL No. 30

notfd 22 March 2019

pts 2–4 comm 2 April 2019 (see s 2)

Plumbing and Drainage Regulation 2019 SL No. 42

notfd 05 April 2019

pts 1 (other than ss 1–2), 2–10, schs 1–11 comm 1 July 2019 on the commencement of the Plumbing and Drainage Act 2018 s 157 (see s 2 and 2019 SL No. 41)

Queensland Building and Construction Commission (Structural Landscaping Licences) Amendment Regulation 2019 SL No. 54

notfd 19 April 2019

ss 3–5 comm 22 April 2019 (see s 2)

Housing and Public Works Legislation (Fees) Amendment Regulation 2019 SL No. 123

notfd 28 June 2019

pts 2–5, 6 (other than s 12), 7–11 comm 1 July 2019 (see s 2 (1))

s 12 comm 1 July 2019 immediately after the commencement of the Plumbing and Drainage Regulation 2019, schedule 8 (see s 2 (2))

Queensland Building and Construction Commission (Mechanical Services Licences) and Other Legislation Amendment Regulation 2019 SL No. 213

notfd 25 October 2019

pts 2–3 comm 1 January 2020 (see s 2)

Queensland Building and Construction Commission and Other Legislation Amendment Regulation 2019 SL No. 252

notfd 13 December 2019

pt 3 (other than ss 10, 13) comm on date of notification

ss 10, 13 comm 1 January 2020 immediately after the commencement of the Queensland Building and Construction Commission (Mechanical Services Licences) and Other Legislation Amendment Regulation 2019, section 16 (see s 2 (3))

Queensland Building and Construction Commission (Mechanical Services Licences) Amendment Regulation 2020 SL No. 86

notfd 12 June 2020

comm on date of notification

Housing and Public Works Legislation (Fees) Amendment Regulation 2020 SL No. 119

notfd 01 July 2020

pt 8 comm on date of notification

Queensland Building and Construction Commission and Other Legislation (Fire Protection Licensing) Amendment Regulation 2020 SL No. 223

notfd 25 September 2020

pt 4 divs 1–2 comm 1 October 2020 immediately after the commencement of the Building Industry Fairness (Security of Payment) and Other Legislation Amendment Act 2020, section 111 (see s 2(1)(b))

pt 4 div 3 (other than s 29(2)) (amd 2021 SL No. 37 pt 3) comm 1 May 2021 (see s 2(2))

s 29(2) never comm amd om 2021 SL No. 37 s 8

Building Industry Fairness (Security of Payment) and Other Legislation Amendment Regulation 2020 SL No. 241

notfd 01 October 2020

pt 6 (other than ss 26, 32 (3)–(4), 33–34) comm 1 October 2020 (see s 2 (1) (c))

ss 26, 32 (3)–(4), 33 (amd 2021 SL No. 37 pt 2), 34 comm 1 May 2021 (see s 2 (3) (b))

Energy and Public Works Legislation (Fees) Amendment Regulation 2021 SL No. 83

notfd 30 June 2021

pt 9 comm 1 July 2021 (see s 2)

Queensland Building and Construction Commission (Mechanical Services Licences) Amendment Regulation 2021 SL No. 107

notfd 30 July 2021

comm on date of notification

Building Regulation 2021 SL No. 126

notfd 27 August 2021

pt 12 div 4 comm 1 September 2021 (see s 2)

Medicines and Poisons (Pest Management Activities) Regulation 2021 SL No. 142

notfd 17 September 2021

pt 8 div 2 comm 27 September 2021 (see s 2)

Queensland Building and Construction Commission (Rectification of Building Work) Amendment Regulation 2021 SL No. 164

notfd 10 November 2021

comm on date of notification

Queensland Building and Construction Commission (Fire Protection Licensing) Amendment Regulation 2021 SL No. 183

notfd 10 December 2021

comm on date of notification

Energy and Public Works Legislation (Fee Unit Conversion) Amendment Regulation 2022 SL No. 78

notfd 24 June 2022

pt 9 comm 1 July 2022 (see s 2)

This is a consolidated list of all history notes in this reprint. Show or hide the list by using the Turn history notes on/off button at the top of the page. The complete list can be printed (Ctrl-P) from the screen when the history notes are turned on.

s 6AA ins 2020 SL No. 241 s 26

s 6A ins 2019 SL No. 213 s 7

s 6B ins 2020 SL No. 241 s 27

amd 2021 SL No. 142 s 76

s 7 amd 2019 SL No. 213 s 8

s 7A ins 2020 SL No. 223 s 17 (amd 2021 SL No. 37 s 5)

s 8 amd 2020 SL No. 223 ss 11, 18

s 9 amd 2020 SL No. 223 s 12, 19

s 10 amd 2020 SL No. 223 s 20

s 11 amd 2020 SL No. 223 s 21

s 11A ins 2019 SL No. 213 s 9

s 12 amd 2020 SL No. 223 s 22

s 15A ins 2019 SL No. 213 s 10

s 16 amd 2018 SL No. 218 s 30; 2019 SL No. 30 s 31; 2020 SL No. 241 s 28

s 18A ins 2020 SL No. 223 s 23 (amd 2021 SL No. 37 s 6)

s 24 amd 2018 SL No. 177 s 21

s 28 amd 2020 SL No. 223 s 24

s 48A ins 2020 SL No. 241 s 29

s 53A ins 2021 SL No. 164 s 3

s 55 amd 2018 SL No. 218 s 30; 2020 SL No. 241 s 30

s 56A ins 2020 SL No. 241 s 31

s 58 amd 2018 SL No. 218 s 30

pt 9 hdg amd 2020 SL No. 223 s 13

pt 9 div 1 hdg ins 2019 SL No. 213 s 11

s 59 amd 2019 SL No. 213 s 12

s 61 amd 2019 SL No. 30 s 32

pt 9 div 2 hdg ins 2019 SL No. 213 s 13

pt 9 div 2 sdiv 1 hdg ins 2019 SL No. 213 s 13

s 66 ins 2019 SL No. 213 s 13

s 67 ins 2019 SL No. 213 s 13

s 68 ins 2019 SL No. 213 s 13

s 69 ins 2019 SL No. 213 s 13

pt 9 div 2 sdiv 2 hdg ins 2019 SL No. 213 s 13

s 70 ins 2019 SL No. 213 s 13

sub 2020 SL No. 86 s 3

s 70A ins 2020 SL No. 86 s 3

s 70B ins 2020 SL No. 86 s 3

s 70C ins 2020 SL No. 86 s 3

s 70D ins 2020 SL No. 86 s 3

s 70E ins 2020 SL No. 86 s 3

s 71 ins 2019 SL No. 213 s 13

pt 9 div 2 sdiv 2A hdg ins 2020 SL No. 86 s 4

s 71A ins 2020 SL No. 86 s 4

pt 9 div 2 sdiv 3 hdg ins 2019 SL No. 213 s 13

s 72 ins 2019 SL No. 213 s 13

s 73 ins 2019 SL No. 213 s 13

s 73A ins 2020 SL No. 86 s 5

pt 9 div 2 sdiv 4 hdg ins 2019 SL No. 213 s 13

s 74 ins 2019 SL No. 213 s 13

amd 2020 SL No. 86 s 6

s 75 ins 2019 SL No. 213 s 13

pt 9 div 3 hdg ins 2019 SL No. 252 s 10

s 76 ins 2019 SL No. 252 s 9

pt 9 div 4 hdg ins 2020 SL No. 223 s 14

pt 9 div 4 sdiv 1 hdg ins 2020 SL No. 223 s 25

s 77 ins 2020 SL No. 223 s 14

amd 2020 SL No. 223 s 26

s 78 ins 2020 SL No. 223 s 14

s 79 ins 2020 SL No. 223 s 14

s 80 ins 2020 SL No. 223 s 27

s 81 ins 2020 SL No. 223 s 27

pt 9 div 4 sdiv 2 hdg ins 2020 SL No. 223 s 28

s 82 ins 2020 SL No. 223 s 28 (amd 2021 SL No. 37 s 7(1))

s 83 ins 2020 SL No. 223 s 28 (amd 2021 SL No. 37 s 7(2))

s 84 ins 2020 SL No. 223 s 28

s 85 ins 2020 SL No. 223 s 28 (amd 2021 SL No. 37 s 7(3)–(8))

s 85A ins 2020 SL No. 223 s 28 (amd 2021 SL No. 37 s 7(9))

s 85B ins 2020 SL No. 223 s 28 (amd 2021 SL No. 37 s 7(9))

pt 9 div 5 hdg ins 2021 SL No. 107 s 3

s 86 ins 2021 SL No. 107 s 3

pt 9 div 6 hdg ins 2021 SL No. 183 s 3

pt 9 div 6 sdiv 1 hdg ins 2021 SL No. 183 s 3

s 87 ins 2021 SL No. 183 s 3

pt 9 div 6 sdiv 2 hdg ins 2021 SL No. 183 s 3

s 88 ins 2021 SL No. 183 s 3

pt 9 div 6 sdiv 3 hdg ins 2021 SL No. 183 s 3

s 89 ins 2021 SL No. 183 s 3

s 90 ins 2021 SL No. 183 s 3

s 91 ins 2021 SL No. 183 s 3

pt 9A hdg ins 2019 SL No. 252 s 9

om 2019 SL No. 252 s 10

sch 1 s 2 amd 2019 SL No. 213 s 14(1); 2020 SL No. 241 s 32(1)–(2)

sch 1 s 8 amd 2020 SL No. 241 s 32(3)–(4)

s 21 om 2020 SL No. 223 s 29(1)

sch 1 s 33 amd 2019 SL No. 213 s 14(2); 2020 SL No. 241 s 32(5)–(8)

s 44 om 2020 SL No. 223 s 29(1)

sch 1 s 54 ins 2019 SL No. 252 s 11

sch 1AA hdg ins 2020 SL No. 241 s 33

sch 1AA s 1 ins 2020 SL No. 241 s 33 (amd 2021 SL No. 37 s 3(1)–(3))

amd 2021 SL No. 126 s 113

sch 1AA s 2 ins 2020 SL No. 241 s 33 (amd 2021 SL No. 37 s 3(4))

sch 1AA ins 2020 SL No. 241 s 33 (amd 2021 SL No. 37 s 3)

sch 1A ins 2019 SL No. 213 s 15

amd 2020 SL No. 223 s 30

sch 2 pt 1 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 2 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 3 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 4 s 2 amd 2019 SL No. 213 s 16(1); 2020 SL No. 223 s 31(1)

sch 2 pt 4 s 6 amd 2018 SL No. 218 s 31

sch 2 pt 5 s 2 amd 2019 SL No. 213 s 16(2); 2020 SL No. 223 s 31(1)

sch 2 pt 5 s 6 amd 2018 SL No. 218 s 31

sch 2 pt 6 s 2 amd 2019 SL No. 213 s 16(3); 2020 SL No. 223 s 31(2)–(4)

sch 2 pt 6 s 6 amd 2018 SL No. 218 s 31

sch 2 pt 7 s 2 amd 2019 SL No. 213 s 16(4)

sch 2 pt 7 s 6 amd 2018 SL No. 218 s 31

sch 2 pt 8 s 2 amd 2019 SL No. 213 s 16(5)

sch 2 pt 8 s 6 amd 2018 SL No. 218 s 31

sch 2 pt 9 s 2 amd 2019 SL No. 213 s 16(6)

sch 2 pt 9 s 6 amd 2018 SL No. 218 s 31

sch 2 pt 10 s 2 amd 2019 SL No. 54 s 4; 2019 SL No. 213 s 16(7)

sch 2 pt 10 s 6 amd 2018 SL No. 218 s 31

sch 2 pt 11 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 12 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 13 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 14 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 15 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 16 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 17 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 18 s 2 amd 2019 SL No. 42 s 128 sch 11; 2019 SL No. 252 s 12(1)–(2)

sch 2 pt 18 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 19 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 20 hdg amd 2019 SL No. 42 s 128 sch 11

sch 2 pt 20 s 2 amd 2019 SL No. 42 s 128 sch 11

sch 2 pt 20 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 20 s 6 def drainer—on-site sewage facility licence ins 2019 SL No. 42 s 128 sch 11

sch 2 pt 20 s 6 def drainer—on-site sewerage facility licence om 2019 SL No. 42 s 128 sch 11

sch 2 pt 21 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 22 hdg om 2020 SL No. 223 s 31(5)

sch 2 pt 22 s 1 om 2020 SL No. 223 s 31(5)

sch 2 pt 22 s 2 om 2020 SL No. 223 s 31(5)

sch 2 pt 22 s 3 om 2020 SL No. 223 s 31(5)

sch 2 pt 22 s 4 om 2020 SL No. 223 s 31(5)

sch 2 pt 22 s 5 om 2020 SL No. 223 s 31(5)

sch 2 pt 22 s 6 amd 2018 SL No. 218 s 31

om 2020 SL No. 223 s 31(5)

sch 2 pt 22A hdg ins 2020 SL No. 223 s 31(5)

sch 2 pt 22A s 1 ins 2020 SL No. 223 s 31(5)

sch 2 pt 22A s 2 ins 2020 SL No. 223 s 31(5)

sch 2 pt 22A s 3 ins 2020 SL No. 223 s 31(5)

sch 2 pt 22A s 4 ins 2020 SL No. 223 s 31(5)

sch 2 pt 22A s 5 ins 2020 SL No. 223 s 31(5)

sch 2 pt 22A s 6 ins 2020 SL No. 223 s 31(5)

sch 2 pt 23 hdg om 2020 SL No. 223 s 31(5)

sch 2 pt 23 s 1 om 2020 SL No. 223 s 31(5)

sch 2 pt 23 s 2 om 2020 SL No. 223 s 31(5)

sch 2 pt 23 s 3 om 2020 SL No. 223 s 31(5)

sch 2 pt 23 s 4 om 2020 SL No. 223 s 31(5)

sch 2 pt 23 s 5 om 2020 SL No. 223 s 31(5)

sch 2 pt 23 s 6 amd 2018 SL No. 218 s 31

om 2020 SL No. 223 s 31(5)

sch 2 pt 24 hdg om 2020 SL No. 223 s 31(5)

sch 2 pt 24 s 1 om 2020 SL No. 223 s 31(5)

sch 2 pt 24 s 2 om 2020 SL No. 223 s 31(5)

sch 2 pt 24 s 3 om 2020 SL No. 223 s 31(5)

sch 2 pt 24 s 4 om 2020 SL No. 223 s 31(5)

sch 2 pt 24 s 5 om 2020 SL No. 223 s 31(5)

sch 2 pt 24 s 6 amd 2018 SL No. 218 s 31

om 2020 SL No. 223 s 31(5)

sch 2 pt 25 hdg sub 2020 SL No. 223 s 31(5)

sch 2 pt 25 s 1 sub 2020 SL No. 223 s 31(5)

sch 2 pt 25 s 2 amd 2019 SL No. 252 s 12(3)

sub 2020 SL No. 223 s 31(5)

sch 2 pt 25 s 3 sub 2020 SL No. 223 s 31(5) (amd 2021 SL No. 37 s 9(1))

sch 2 pt 25 s 4 sub 2020 SL No. 223 s 31(5)

sch 2 pt 25 s 5 sub 2020 SL No. 223 s 31(5)

sch 2 pt 25 s 6 amd 2018 SL No. 218 s 31

sub 2020 SL No. 223 s 31(5)

sch 2 pt 26 hdg sub 2020 SL No. 223 s 31(5)

sch 2 pt 26 s 1 sub 2020 SL No. 223 s 31(5)

sch 2 pt 26 s 2 amd 2019 SL No. 252 s 12(4)–(5)

sub 2020 SL No. 223 s 31(5)

sch 2 pt 26 s 3 sub 2020 SL No. 223 s 31(5)

sch 2 pt 26 s 4 sub 2020 SL No. 223 s 31(5)

sch 2 pt 26 s 5 sub 2020 SL No. 223 s 31(5)

sch 2 pt 26 s 6 amd 2018 SL No. 218 s 31

sub 2020 SL No. 223 s 31(5)

sch 2 pt 27 hdg om 2020 SL No. 223 s 31(5)

sch 2 pt 27 s 1 om 2020 SL No. 223 s 31(5)

sch 2 pt 27 s 2 om 2020 SL No. 223 s 31(5)

sch 2 pt 27 s 3 om 2020 SL No. 223 s 31(5)

sch 2 pt 27 s 4 om 2020 SL No. 223 s 31(5)

sch 2 pt 27 s 5 om 2020 SL No. 223 s 31(5)

sch 2 pt 27 s 6 amd 2018 SL No. 218 s 31

om 2020 SL No. 223 s 31(5)

sch 2 pt 28 hdg om 2020 SL No. 223 s 31(5)

sch 2 pt 28 s 1 om 2020 SL No. 223 s 31(5)

sch 2 pt 28 s 2 om 2020 SL No. 223 s 31(5)

sch 2 pt 28 s 3 om 2020 SL No. 223 s 31(5)

sch 2 pt 28 s 4 om 2020 SL No. 223 s 31(5)

sch 2 pt 28 s 5 om 2020 SL No. 223 s 31(5)

sch 2 pt 28 s 6 amd 2018 SL No. 218 s 31

om 2020 SL No. 223 s 31(5)

sch 2 pt 29 hdg sub 2020 SL No. 223 s 31(5)

sch 2 pt 29 s 1 sub 2020 SL No. 223 s 31(5)

sch 2 pt 29 s 2 sub 2020 SL No. 223 s 31(5)

sch 2 pt 29 s 3 sub 2020 SL No. 223 s 31(5)

sch 2 pt 29 s 4 sub 2020 SL No. 223 s 31(5)

sch 2 pt 29 s 5 sub 2020 SL No. 223 s 31(5)

sch 2 pt 29 s 6 amd 2018 SL No. 218 s 31

sub 2020 SL No. 223 s 31(5)

sch 2 pt 30 hdg om 2020 SL No. 223 s 31(5)

sch 2 pt 30 s 1 om 2020 SL No. 223 s 31(5)

sch 2 pt 30 s 2 amd 2019 SL No. 252 s 12(6)

om 2020 SL No. 223 s 31(5)

sch 2 pt 30 s 3 om 2020 SL No. 223 s 31(5)

sch 2 pt 30 s 4 om 2020 SL No. 223 s 31(5)

sch 2 pt 30 s 5 om 2020 SL No. 223 s 31(5)

sch 2 pt 30 s 6 amd 2018 SL No. 218 s 31

om 2020 SL No. 223 s 31(5)

sch 2 pt 31 hdg sub 2020 SL No. 223 s 31(5)

sch 2 pt 31 s 1 sub 2020 SL No. 223 s 31(5)

sch 2 pt 31 s 2 sub 2020 SL No. 223 s 31(5)

sch 2 pt 31 s 3 sub 2020 SL No. 223 s 31(5) (amd 2021 SL No. 37 s 9(2))

sch 2 pt 31 s 4 sub 2020 SL No. 223 s 31(5)

sch 2 pt 31 s 5 sub 2020 SL No. 223 s 31(5)

sch 2 pt 31 s 6 amd 2018 SL No. 218 s 31

sub 2020 SL No. 223 s 31(5)

sch 2 pt 32 hdg om 2020 SL No. 223 s 31(5)

sch 2 pt 32 s 1 om 2020 SL No. 223 s 31(5)

sch 2 pt 32 s 2 om 2020 SL No. 223 s 31(5)

sch 2 pt 32 s 3 om 2020 SL No. 223 s 31(5)

sch 2 pt 32 s 4 om 2020 SL No. 223 s 31(5)

sch 2 pt 32 s 5 om 2020 SL No. 223 s 31(5)

sch 2 pt 32 s 6 amd 2018 SL No. 218 s 31

om 2020 SL No. 223 s 31(5)

sch 2 pt 33 s 2 amd 2020 SL No. 223 s 31(6)–(7)

sch 2 pt 33 s 2A ins 2020 SL No. 223 s 31(8) (amd 2021 SL No. 37 s 9(3))

sch 2 pt 33 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 34 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 35 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 36 s 2 amd 2019 SL No. 252 s 12(7)–(8)

sch 2 pt 36 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 37 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 38 s 2 amd 2020 SL No. 223 s 31(9)

sch 2 pt 38 s 2A ins 2020 SL No. 223 s 31(10) (amd 2021 SL No. 37 s 9(4))

sch 2 pt 38 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 39 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 40 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 41 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 42 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 43 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 44 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 45 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 46 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 47 hdg sub 2019 SL No. 213 s 16(8)

sch 2 pt 47 s 1 sub 2019 SL No. 213 s 16(8)

sch 2 pt 47 s 2 amd 2019 SL No. 252 s 12(9)–(10)

sub 2019 SL No. 213 s 16(8)

amd 2019 SL No. 252 s 13(1)–(2); 2020 SL No. 86 s 7(1)

sch 2 pt 47 s 3 sub 2019 SL No. 213 s 16(8)

sch 2 pt 47 s 4 sub 2019 SL No. 213 s 16(8)

sch 2 pt 47 s 5 amd 2018 SL No. 218 s 31

sub 2019 SL No. 213 s 16(8)

sch 2 pt 47 s 6 ins 2019 SL No. 213 s 16(8)

sch 2 pt 48 hdg sub 2019 SL No. 213 s 16(8)

sch 2 pt 48 s 1 sub 2019 SL No. 213 s 16(8)

sch 2 pt 48 s 2 amd 2019 SL No. 252 s 12(11)–(13)

sub 2019 SL No. 213 s 16(8)

amd 2019 SL No. 252 s 13(3)–(5); 2020 SL No. 86 s 7(2)

sch 2 pt 48 s 3 sub 2019 SL No. 213 s 16(8)

sch 2 pt 48 s 4 sub 2019 SL No. 213 s 16(8)

sch 2 pt 48 s 5 amd 2018 SL No. 218 s 31

sub 2019 SL No. 213 s 16(8)

sch 2 pt 48 s 6 ins 2019 SL No. 213 s 16(8)

sch 2 pt 48A hdg ins 2019 SL No. 213 s 16(8)

sch 2 pt 48A s 1 ins 2019 SL No. 213 s 16(8)

sch 2 pt 48A s 2 ins 2019 SL No. 213 s 16(8)

amd 2019 SL No. 252 s 13(6)–(7)

sch 2 pt 48A s 3 ins 2019 SL No. 213 s 16(8)

sch 2 pt 48A s 4 ins 2019 SL No. 213 s 16(8)

sch 2 pt 48A s 5 ins 2019 SL No. 213 s 16(8)

sch 2 pt 48A s 6 ins 2019 SL No. 213 s 16(8)

sch 2 pt 48B hdg ins 2019 SL No. 213 s 16(8)

sch 2 pt 48B s 1 ins 2019 SL No. 213 s 16(8)

sch 2 pt 48B s 2 ins 2019 SL No. 213 s 16(8)

amd 2019 SL No. 252 s 13(8)–(10)

sch 2 pt 48B s 3 ins 2019 SL No. 213 s 16(8)

sch 2 pt 48B s 4 ins 2019 SL No. 213 s 16(8)

sch 2 pt 48B s 5 ins 2019 SL No. 213 s 16(8)

sch 2 pt 48B s 6 ins 2019 SL No. 213 s 16(8)

sch 2 pt 49 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 50 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 51 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 52 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 53 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 54 s 2 amd 2019 SL No. 54 s 5

sch 2 pt 54 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 55 s 2 amd 2019 SL No. 213 s 16(9)–(10)

sch 2 pt 55 s 6 amd 2018 SL No. 218 s 31

sch 2 pt 56 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 57 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 58 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 59 s 5 amd 2018 SL No. 218 s 31

sch 2 pt 60 s 5 amd 2018 SL No. 218 s 31

sch 3 pt 1 hdg om 2020 SL No. 223 s 32(1)

sch 3 pt 1 s 1 om 2020 SL No. 223 s 32(1)

sch 3 pt 1 s 2 om 2020 SL No. 223 s 32(1)

sch 3 pt 1 s 3 om 2020 SL No. 223 s 32(1)

sch 3 pt 1A hdg ins 2020 SL No. 223 s 32(1)

sch 3 pt 1A s 1 ins 2020 SL No. 223 s 32(1)

sch 3 pt 1A s 2 ins 2020 SL No. 223 s 32(1)

sch 3 pt 1A s 3 ins 2020 SL No. 223 s 32(1)

sch 3 pt 2 hdg om 2020 SL No. 223 s 32(1)

sch 3 pt 2 s 1 om 2020 SL No. 223 s 32(1)

sch 3 pt 2 s 2 om 2020 SL No. 223 s 32(1)

sch 3 pt 2 s 3 om 2020 SL No. 223 s 32(1)

sch 3 pt 3 hdg om 2020 SL No. 223 s 32(1)

sch 3 pt 3 s 1 om 2020 SL No. 223 s 32(1)

sch 3 pt 3 s 2 om 2020 SL No. 223 s 32(1)

sch 3 pt 3 s 3 om 2020 SL No. 223 s 32(1)

sch 3 pt 4 hdg sub 2020 SL No. 223 s 32(1)

sch 3 pt 4 s 1 sub 2020 SL No. 223 s 32(1)

sch 3 pt 4 s 2 sub 2020 SL No. 223 s 32(1)

sch 3 pt 4 s 3 sub 2020 SL No. 223 s 32(1) (amd 2021 SL No. 37 s 10(1))

sch 3 pt 5 hdg sub 2020 SL No. 223 s 32(1)

sch 3 pt 5 s 1 sub 2020 SL No. 223 s 32(1)

sch 3 pt 5 s 2 sub 2020 SL No. 223 s 32(1)

sch 3 pt 5 s 3 sub 2020 SL No. 223 s 32(1)

sch 3 pt 6 hdg om 2020 SL No. 223 s 32(1)

sch 3 pt 6 s 1 om 2020 SL No. 223 s 32(1)

sch 3 pt 6 s 2 om 2020 SL No. 223 s 32(1)

sch 3 pt 6 s 3 om 2020 SL No. 223 s 32(1)

sch 3 pt 7 hdg om 2020 SL No. 223 s 32(1)

sch 3 pt 7 s 1 om 2020 SL No. 223 s 32(1)

sch 3 pt 7 s 2 om 2020 SL No. 223 s 32(1)

sch 3 pt 7 s 3 om 2020 SL No. 223 s 32(1)

sch 3 pt 8 hdg sub 2020 SL No. 223 s 32(1)

sch 3 pt 8 s 1 sub 2020 SL No. 223 s 32(1)

sch 3 pt 8 s 2 sub 2020 SL No. 223 s 32(1)

sch 3 pt 8 s 3 sub 2020 SL No. 223 s 32(1)

sch 3 pt 9 hdg om 2020 SL No. 223 s 32(1)

sch 3 pt 9 s 1 om 2020 SL No. 223 s 32(1)

sch 3 pt 9 s 2 om 2020 SL No. 223 s 32(1)

sch 3 pt 9 s 3 om 2020 SL No. 223 s 32(1)

sch 3 pt 10 hdg sub 2020 SL No. 223 s 32(1)

sch 3 pt 10 s 1 sub 2020 SL No. 223 s 32(1)

sch 3 pt 10 s 2 sub 2020 SL No. 223 s 32(1)

sch 3 pt 10 s 3 sub 2020 SL No. 223 s 32(1) (amd 2021 SL No. 37 s 10(2))

sch 3 pt 11 hdg om 2020 SL No. 223 s 32(1)

sch 3 pt 11 s 1 om 2020 SL No. 223 s 32(1)

sch 3 pt 11 s 2 om 2020 SL No. 223 s 32(1)

sch 3 pt 11 s 3 om 2020 SL No. 223 s 32(1)

sch 3 pt 12 s 2 amd 2020 SL No. 223 s 32(2)–(3)

sch 3 pt 12 s 2A ins 2020 SL No. 223 s 32(4) (amd 2021 SL No. 37 s 10(3))

sch 3A hdg ins 2019 SL No. 213 s 17

sch 3A pt 1 hdg ins 2019 SL No. 213 s 17

sch 3A pt 1 s 1 ins 2019 SL No. 213 s 17

sch 3A pt 1 s 2 ins 2019 SL No. 213 s 17

amd 2020 SL No. 86 s 8(1); 2020 SL No. 241 s 34(1)–(3)

sch 3A pt 1 s 3 ins 2019 SL No. 213 s 17

sch 3A pt 2 hdg ins 2019 SL No. 213 s 17

sch 3A pt 2 s 1 ins 2019 SL No. 213 s 17

sch 3A pt 2 s 2 ins 2019 SL No. 213 s 17

amd 2020 SL No. 86 s 8(2); 2020 SL No. 241 s 34(4)–(7)

sch 3A pt 2 s 3 ins 2019 SL No. 213 s 17

sch 3A pt 3 hdg ins 2019 SL No. 213 s 17

sch 3A pt 3 s 1 ins 2019 SL No. 213 s 17

sch 3A pt 3 s 2 ins 2019 SL No. 213 s 17

amd 2020 SL No. 86 s 8(3); 2020 SL No. 241 s 34(8)–(10)

sch 3A pt 3 s 3 ins 2019 SL No. 213 s 17

sch 4 amd 2019 SL No. 42 s 128 sch 11; 2021 SL No. 183 s 4

sch 5 amd 2018 SL No. 177 s 22

sch 6 s 15 amd 2020 SL No. 223 s 33

sch 6 s 48 amd 2019 SL No. 252 s 14

sch 6 s 51 amd 2021 SL No. 126 s 114

sch 7 sub 2019 SL No. 123 s 16

amd 2019 SL No. 252 s 15; 2019 SL No. 213 s 18

sub 2020 SL No. 119 s 16

amd 2020 SL No. 241 s 35

sub 2021 SL No. 83 s 20

amd 2022 SL No. 78 s 21

sch 7A ins 2020 SL No. 223 s 15

amd 2020 SL No. 223 s 34

sch 7B ins 2020 SL No. 223 s 35 (amd 2021 SL No. 37 s 11)

sch 8 def agency of the State reloc from sch 1 s 8(2) 2020 SL No. 241 s 32(3)

sch 8 def building certifying function ins 2020 SL No. 223 s 36(2)

sch 8 def certify sub 2020 SL No. 223 s 36

sch 8 def commercial and industrial fire sprinkler systems ins 2020 SL No. 223 s 36(2)

sch 8 def conviction ins 2018 SL No. 177 s 23

sch 8 def design licence sub 2020 SL No. 223 s 36

sch 8 def design requirements ins 2020 SL No. 223 s 36(2)

sch 8 def domestic fire sprinkler systems ins 2020 SL No. 223 s 36(2)

sch 8 def emergency lighting ins 2020 SL No. 223 s 36(2)

sch 8 def evacuation route ins 2020 SL No. 223 s 36(2)

sch 8 def fire alarm systems ins 2020 SL No. 223 s 36(2)

sch 8 def fire and smoke walls ins 2020 SL No. 223 s 36(2) (amd 2021 SL No. 37 s 12(1))

sch 8 def fire protection licence amd 2020 SL No. 223 s 16

sub 2020 SL No. 223 s 36

sch 8 def fire-rated ceilings ins 2020 SL No. 223 s 36(2)

sch 8 def fire sprinkler systems ins 2020 SL No. 223 s 36(2)

sch 8 def inspect and test sub 2020 SL No. 223 s 36 (amd 2021 SL No. 37 s 12(2))

sch 8 def install sub 2020 SL No. 223 s 36 (amd 2021 SL No. 37 s 12(3))

sch 8 def maintain sub 2020 SL No. 223 s 36 (amd 2021 SL No. 37 s 12(4))

sch 8 def mechanical services licence ins 2019 SL No. 213 s 19

sch 8 def medical gas work ins 2019 SL No. 213 s 19

sch 8 def minimum financial requirements policy om 2018 SL No. 218 s 32

sch 8 def Queensland Development Code ins 2020 SL No. 223 s 36(2)

sch 8 def refrigerant gas ins 2019 SL No. 213 s 19

sch 8 def relevant special hazard fire systems ins 2020 SL No. 223 s 36(2)

sch 8 def residential fire sprinkler systems ins 2020 SL No. 223 s 36(2)

sch 8 def survey om 2020 SL No. 223 s 36(1)

Queensland Building and Construction Commission Regulation 2018

Notification: 31 August 2018 PDF icon 2018 SL No. 138

HTML icon 2018 SL No. 138

PDF icon Explanatory Note

HTML icon Explanatory Note

Tabled: 04 September 2018