Natural Resources, Mines and Energy Legislation (Fees) Amendment Regulation 2018


Queensland Crest

Part 1 Preliminary

1Short title

This regulation may be cited as the Natural Resources, Mines and Energy Legislation (Fees) Amendment Regulation 2018.

2Commencement

(1)This regulation, other than sections 23, 27, 40, 46 and 47 commences on 1 July 2018.
(2)Sections 23, 27, 40, 46 and 47 commence on 1 September 2018.

3Regulation amended

This part amends the Acquisition of Land Regulation 2014.

4Amendment of s 3 (Fee—Act, s 9)

(1)Section 3(a), ‘$186.00’—

omit, insert

$192.50

(2)Section 3(b), ‘$186.00 plus $55.15’—

omit, insert

$192.50 plus $57.10

5Regulation amended

This part amends the Building Units and Group Titles Regulation 2008.

6Amendment of sch 3 (Fees)

Schedule 3, part 1

omit, insert

Part 1 Fees payable to the registrar

  

$

1

Lodging a plan or plan of amalgamation for registration (Act, s 9(16))

374.00

2

Additional fee for each lot in a plan or plan of amalgamation lodged for registration

28.00

3

Lodging for registration—

(a)  a notice of conversion (Act, s 9(16))

126.00

(b)  a request to register an order, made under section 25(7A)(c) of the Act, directing an amendment of a building units plan

126.00

(c)  a notification of proposed extinguishment of a plan under section 26(1)(a) of the Act

126.00

4

Lodging—

(a)  a copy of a referee’s order under section 112(1)(a) of the Act (Act, s 112(1)(b))

126.00

(b)  notification of an amendment of, addition to or repeal of by-laws (Act, s 30(3))

126.00

5

Furnishing copies of a registered plan or amendment of a registered plan (Act, s 14)

28.00

6

Application to—

(a)  reserve a name (Act, s 120(1))

91.00

(b)  extend the period for which a name is reserved (Act, s 120(3))

91.00

7

Lodging another document under the Act

35.00

7Regulation amended

This part amends the Coal Mining Safety and Health Regulation 2017.

8Replacement of sch 8 (Fees)

Schedule 8

omit, insert

Schedule 8 Fees

sections 12E, 12H and 372

Part 1 Board of examiners fees

  

$

1

Application for assessment for a first class, or second class, certificate of competency

42.45

2

Application for assessment for a deputy’s, or open-cut examiner’s, certificate of competency

25.15

3

Issuing a duplicate certificate of competency to replace a lost, destroyed or defaced certificate

8.20

Part 2 Other fees

$

1

Safety and health fee for a coal mine for a financial year—

(a)  if the number of coal mine workers working at the coal mine during the financial year is more than 5 but not more than 10—for each coal mine worker working at the coal mine during the financial year

114.70

(b)  if the number of coal mine workers working at the coal mine during the financial year is more than 10—for each coal mine worker working at the coal mine during the financial year

911.00

2

Fee for late safety and health census

114.70

Part 5 Amendment of Electricity Regulation 2006

9Regulation amended

This part amends the Electricity Regulation 2006.

10Replacement of sch 7 (Fees payable to regulator)

Schedule 7
omit, insert—

Schedule 7 Fees payable to regulator

section 226(1)

$

1

Application for generation authority (Act, s 179)

1,691.00

2

Application for transmission authority (Act, s 188)

1,691.00

3

Application for distribution authority (Act, s 196)

1,691.00

4

Application for special approval (Act, s 209)

493.90

5

Application for transfer of a generation authority, transmission authority, distribution authority or special approval (Act, s 184A, 193A, 201A or 212A)

156.90

6

Application for registration of an item of prescribed electrical equipment (s 138)

217.90

7

Application for approval of a change to an energy efficiency label (s 144)

217.90

8

Application for approval of transfer of registration of an item of prescribed electrical equipment (s 147)

72.55

9

Inspection of the register (s 154)

14.20

10

Copy of 1 entry in the register (s 154)

28.75

11Amendment of sch 8 (Maximum fees payable to electricity entity)

Schedule 8, parts 1 to 3—
omit, insert—

Part 1 Meter reading and testing

$

1

Special meter reading by Energex

38.40

2

Special meter reading by Ergon Energy

44.60

3

Testing of a meter by a distribution entity

20.65

Part 2 Disconnection and reconnection

$

1

Disconnection of supply of electricity to premises

nil

2

Reconnection of supply of electricity to a customer’s (the current customer’s) premises after disconnection at a customer’s request or under the National Energy Retail Rules, rule 119(1)(g) to (i)—

(a)  if the reconnection is made during ordinary business hours

nil

(b)  if the reconnection is made outside ordinary business hours at the current customer’s request

125.10

3

Reconnection of supply of electricity to a customer’s premises other than as mentioned in item 2—

(a)  if the reconnection is made during ordinary business hours

51.90

(b)  if the reconnection is made outside ordinary business hours at the customer’s request

125.10

Part 3 Temporary connections

$

1

Temporary connection of a supply of electricity to a building site by Ergon Energy during ordinary business hours (single-phase or multi-phase)

469.90

2

Temporary connection of a supply of electricity by Energex during ordinary business hours (current transformer or no current transformer)

469.90

Part 6 Amendment of Explosives Regulation 2017

12Regulation amended

This part amends the Explosives Regulation 2017.

13Replacement of sch 2 (Fees)

Schedule 2

omit, insert

Schedule 2 Fees

sections 13(2)(c), 21, 178(2) and 181(3)

Part 1 Fees for authorities and declaration

  

$

1

Licence to import explosives or licence to export explosives—

 
 

(a)  for blasting explosives—
 
 

(i)  application for licence

nil

 

(ii)  licence for 1 year

717.00

 

(b)  for propellant powders and ammunition—
 
 

(i)  application for licence

nil

 

(ii)  licence for 1 year

475.80

 

(c)  for fireworks—
 
 

(i)  application for licence

nil

 

(ii)  licence for 1 year

350.70

 

(d)  for distress signals—
 
 

(i)  application for licence

nil

 

(ii)  licence for 1 year

107.20

 

(e)  for an explosive not mentioned in paragraphs (a) to (d)—
 
 

(i)  application for licence

nil

 

(ii)  licence for 1 year

350.70

2

Licence to manufacture explosives—

 
 

(a)  for an explosives factory other than a mobile manufacturing unit—
 
 

(i)  application for licence

nil

 

(ii)  licence for 1 year

444.10

 

(b)  for a mobile manufacturing unit—
 
 

(i)  application for licence

nil

 

(ii)  licence for 1 year

204.30

 

(c)  for manufacture of explosives at a place that is not an explosives factory—
 
 

(i)  application for licence

nil

 

(ii)  licence for 1 year

103.00

3

Licence to sell explosives—

 
 

(a)  for blasting explosives—
 
 

(i)  application for licence

nil

 

(ii)  licence for 1 year

86.65

 

(b)  for propellant powders—
 
 

(i)  application for licence

nil

 

(ii)  licence for 1 year

86.65

 

(c)  for fireworks—
 
 

(i)  application for licence

nil

 

(ii)  licence for 1 year

86.65

 

(d)  for ammunition—
 
 

(i)  application for licence

nil

 

(ii)  licence for 1 year

16.00

 

(e)  for an explosive not mentioned in paragraphs (a) to (d)—
 
 

(i)  application for licence

nil

 

(ii)  licence for 1 year

86.65

4

Licence to store explosives—

 
 

(a)  for blasting explosives up to 100kg—
 
 

(i)  application for licence

nil

 

(ii)  licence for 1 year

113.60

 

(b)  for blasting explosives greater than 100kg—
 
 

(i)  application for licence

nil

 

(ii)  licence for 1 year

444.10

 

(c)  for propellant powders up to 100kg—
 
 

(i)  application for licence

nil

 

(ii)  licence for 1 year

42.70

 

(d)  for propellant powders greater than 100kg but not greater than 250kg—
 
 

(i)  application for licence

nil

 

(ii)  licence for 1 year

113.60

 

(e)  for propellant powders greater than 250kg—
 
 

(i)  application for licence

nil

 

(ii)  licence for 1 year

444.10

 

(f)  for fireworks up to 100kg (gross weight)—
 
 

(i)  application for licence

nil

 

(ii)  licence for 1 year

42.70

 

(g)  for fireworks greater than 100kg (gross weight)—
 
 

(i)  application for licence

nil

 

(ii)  licence for 1 year

444.10

 

(h)  for an explosive not mentioned in paragraphs (a) to (g), up to 100kg—
 
 

(i)  application for licence

nil

 

(ii)  licence for 1 year

42.70

 

(i)  for an explosive not mentioned in paragraphs (a) to (g), greater than 100kg—
 
 

(i)  application for licence

nil

 

(ii)  licence for 1 year

444.10

5

Licence to transport explosives—

 
 

(a)  application for licence

nil

 

(b)  licence for 1 year for each vehicle stated in the licence

113.60

6

Licence to use explosives—

 
 

(a)  application for licence

nil

 

(b)  licence for 1 year

61.40

7

Shotfirer licence—

 
 

(a)  application for licence

nil

 

(b)  licence for 1 year

61.40

8

Fireworks contractor licence—

 
 

(a)  application for licence

nil

 

(b)  licence for 1 year

408.40

9

Fireworks operator licence—

 
 

(a)  application for licence

nil

 

(b)  licence for 1 year

130.40

10

Licence to collect ammunition—

 
 

(a)  application for licence

nil

 

(b)  licence for 1 year

16.00

11

Application for permit to import explosives

nil

12

Application for permit to export explosives

nil

13

Application for permit to store explosives

nil

14

Application for explosives trial approval

nil

15

Request for declaration that explosive is an authorised explosive

147.00

16

Transfer of licence other than a licence to use an explosive

44.70

17

Copy of licence

44.70

Part 2 Safety and health fee

$

1

Safety and health fee for a financial year (s 178(2))—

 

(a)  if the number of explosives workers working under an authority during the financial year is more than 5 but not more than 10—for each explosives worker working under the authority during the financial year

114.70

(b)  if the number of explosives workers working under an authority during the financial year is more than 10—for each explosives worker working under the authority during the financial year

911.00

2

Late fee (s 181(3))

114.70

14Regulation amended

This part amends the Foreign Ownership of Land Register Regulation 2013.

15Replacement of sch 1 (Fees)

Schedule 1

omit, insert

Schedule 1 Fees

section 3

  

$

1

Title search statement of the details, recorded in the register, of interests in land held by a person (Act, s 14)

19.45

2

Preparation and extraction of statistical data from computerised information recorded in the register (Act, s 14)—

 
 

(a)  if no additional computer programming and processing time is required

121.90

 

(b)  if additional computer programming and processing time is required—for each hour, or part of an hour, of programming and processing time

340.30

Part 8 Amendment of Fossicking Regulation 2009

16Regulation amended

This part amends the Fossicking Regulation 2009.

17Replacement of sch 1 (Fees)

Schedule 1

omit, insert

Schedule 1 Fees

section 39

$

1

Individual fossickers licence—

(a)  for 1 month

8.30

(b)  for 6 months

31.55

(c)  for 1 year

53.10

2

Family fossickers licence—

(a)  for 1 month

11.95

(b)  for 6 months

40.50

(c)  for 1 year

71.00

3

Club fossickers licence

88.95

4

Educational organisation fossickers licence—

(a)  for 1 month

35.25

(b)  for 1 year

71.00

5

Commercial tour operator fossickers licence—

(a)  for 1 month

62.20

(b)  for 1 year

536.00

6

Individual fossickers camping permit or family fossickers camping permit—

(a)  for each whole week

25.05

(b)  for each night not part of a whole week

4.00

7

Club fossickers camping permit or educational organisation fossickers camping permit, for each person who is to camp under the permit—

(a)  for each whole week

12.20

(b)  for each night not part of a whole week

2.07

8

Commercial tour operator fossickers camping permit, for each person who is to camp under the permit—

(a)  for each whole week

25.05

(b)  for each night not part of a whole week

4.00

9

Copy of a licence

8.30

10

Application for agistment approval—for each tag

16.75

11

Agistment fee—for each tag, for each week

0.40

Part 9 Amendment of Gas Supply Regulation 2007

18Regulation amended

This part amends the Gas Supply Regulation 2007.

19Amendment of s 51 (Annual distribution fee—Act, s 40)

(1)Section 51(2), ‘$742.05’—
omit, insert—

$768.00

(2)Section 51(3), formula, ‘61,879.60’—
omit, insert—

64,045.38

20Replacement of sch 1 (Other fees for distribution authorities)

Schedule 1
omit, insert—

Schedule 1 Other fees for distribution authorities

section 53

$

1

Application for distribution authority (Act, s 28)

385.00

2

Application to amend distribution authority, other than to amend a condition imposed under chapter 2, part 1, division 2 of the Act or to correct a clerical or formal error (Act, s 55)

115.20

3

Application to renew distribution authority (Act, s 64)

nil

4

Application to transfer distribution authority (Act, s 68)

385.00

5

Application for approval of surrender of distribution authority (Act, s 73)

nil

6

Late payment fee for an annual distribution fee payable under section 51, paid after the day on which payment is required under section 51(6) (Act, s 323)

115.20

21Regulation amended

This part amends the Geothermal Energy Regulation 2012.

22Amendment of s 80 (Security for geothermal tenure—Act, s 204)

(1)Section 80(2)(a), ‘$13,702’—

omit, insert

$14,182

(2)Section 80(2)(b), ‘$39,968’—

omit, insert

$41,367

23Replacement of sch 2 (Annual rent)

Schedule 2

omit, insert

Schedule 2 Annual rent

section 79

  

$

1

Annual rent for geothermal permit—Act, s 130(1)—for each sub-block included in the area of the permit

2.90

2

Annual rent for geothermal lease—Act, s 130(1)—for each square kilometre included in the area of the lease

155.80

24Replacement of sch 4 (Fees)

Schedule 4

omit, insert

Schedule 4 Fees

section 83

  

$

1

Application for geothermal permit—Act, s 36(e)

1,304.00

2

Application for declaration of all or part of the area of a geothermal permit as a potential geothermal commercial area for the permit—Act, s 65(2)(b)

1,040.00

3

Application for geothermal lease over all or part of the area of a geothermal permit—Act, s 78(f)

1,304.00

4

Application for approval to amend development plan for a geothermal lease—Act, s 100(2)(b)

523.00

5

Fee for request for required information for a geothermal tenure—Act, s 196(1)(b)—

 
 

(a)  for information made available in electronic form , other than on a tape or cartridge

162.40

 

(b)  for information made available on a tape or cartridge

325.20

6

Application for renewal of a geothermal permit—Act, s 292(c)(i)

650.00

25Regulation amended

This part amends the Greenhouse Gas Storage Regulation 2010.

26Amendment of s 32 (Security for GHG authorities)

Section 32(2)—

omit, insert

(2)For section 271(2)(b) of the Act, the following amounts are prescribed—
(a)for a GHG permit or proposed GHG permit—$15,723.00;
(b)for a GHG lease or proposed GHG lease—$45,861.00;
(c)for a GHG data acquisition authority or proposed GHG data acquisition authority—$13,756.00.

27Replacement of sch 1 (Annual rent)

Schedule 1

omit, insert

Schedule 1 Annual rent

section 31

$

1

Annual rent for GHG permit (for each sub-block included in the area of the permit)—Act, s 86(1)

2.85

2

Annual rent for GHG lease (for each square kilometre or part of a square kilometre of the area for the lease)—Act, s 168(1)

155.80

3

Annual rent for GHG data acquisition authority (for each sub-block included in the area of the authority)—Act, s 243(1)

2.85

28Replacement of sch 3 (Fees)

Schedule 3

omit, insert

Schedule 3 Fees

section 35

Part 1 GHG authority fees

$

1

Tender for GHG permit—Act, s 35(d)

1,400.00

2

Application for approval to amend the work program for a GHG permit—Act, s 68(b)

561.00

3

Giving proposed later work program to the Minister within the time required under section 91(3) of the Act—Act, s 91(6), definition relevant fee, paragraph (a)

561.00

4

Application for renewal of GHG permit—Act, s 94(1)(d)(i)

698.00

5

Application for a declaration that all or a stated part of the area of a GHG permit is a potential storage area for the permit—Act, s 101(2)(b)

1,120.00

6

Permit-related application for a GHG lease—Act, s 114(d)

1,400.00

7

Application for approval to amend the development plan for a GHG lease—Act, s 157(2)(b)

561.00

8

Giving proposed later development plan for GHG lease to the Minister within the time required under section 172(3) of the Act—Act, s 172(6), definition relevant fee, paragraph (a)

561.00

9

Surrender application for a GHG lease—Act, s 177(1)(b)

561.00

10

Application for approval of proposed GHG coordination arrangement—Act, s 188(2)(b)(ii)

561.00

11

Application for GHG data acquisition authority—Act, s 234(b)

421.60

Part 2 General GHG authority fees payable under chapter 5 of the Act

$

1

Fee for required information for a GHG authority made available by the chief executive—Act, s 261(1)(b)—

(a)  for information made available in electronic form, other than on a tape or cartridge

165.30

(b)  for information made available on a tape or cartridge

331.30

Part 12 Amendment of Land Regulation 2009

29Regulation amended

This part amends the Land Regulation 2009.

30Amendment of s 36 (Matters for calculating rent (valuations for rental purposes))

Section 36(2), ‘$12,600’—

omit, insert

$13,050

31Amendment of s 37 (Minimum rent for leases of particular categories)

(1)Section 37(a), ‘$252’—

omit, insert

$261

(2)Section 37(b), ‘$123’—

omit, insert

$127

32Amendment of s 37A (Rent for leases of particular categories)

Section 37A(2)—

omit, insert

(2)The rent for a rental period for the following leases is—
(a)for a category 14.1 or 15.1 lease—$127;
(b)for a category 15.2 lease—$6,587;
(c)for a category 15.3 lease—$9,793;
(d)for a category 15.4 lease—$13,179;
(e)for a category 15.5 lease—$19,767.

33Amendment of s 56 (Minimum instalments—Act, ss 457, 462 and 466)

(1)Section 56(a), ‘$346’—

omit, insert

$358

(2)Section 56(b), ‘$858’—

omit, insert

$888

34Replacement of sch 11 (Fees)

Schedule 11

omit, insert

Schedule 11 Fees

section 62

  

$

1

Request for an agreement under section 18 of the Act about a proposed exchange of land

280.40

2

Application—

 
 

(a)  for the allocation of a floating reservation (Act, s 23A)

280.40

 

(b)  to buy—
 
 

(i)  land in a reservation (Act, s 24(3))

280.40

 

(ii)  unallocated State land (Act, ss 120A(1) and 122)

280.40

 

(c)  for the dedication of land as a road for public use (Act, s 94(2))

280.40

 

(d)  for a road closure—
 
 

(i)  if the closure is the permanent closure of the road (Act, s 99(1))

280.40

 

(ii)  if the closure is the temporary closure of the road (including issuing a road licence, over the road, applied for with the application (Act, s 99(3)))

280.40

 

(e)  for a road licence over a temporarily closed road other than the road licence mentioned in paragraph (d)(ii) (Act, s 103)

280.40

 

(f)  for the simultaneous opening and closing of roads (Act, s 109A(1) or 109B(1))

280.40

 

(g)  for a lease of unallocated State land (Act, s 121(1))

280.40

 

(h)  for a change to a lease—
 
 

(i)  if the change is for the lease to be used for additional or fewer purposes (Act, s 154(1))

140.00

 

(ii)  if the change is a change of an imposed condition of the lease (Act, s 210)

140.00

 

(i)  to extend a lease under section 155A or 155B of the Act (Act, s 155A(2) or 155B(2))

280.40

 

(j)  for an offer of a new lease (Act, s 158(1))

280.40

 

(k)  that is a conversion application (Act, s 166(1))

280.40

 

(l)  that is an extension application (Act, s 164C(1))

280.40

 

(m)  for approval to subdivide a lease (Act, s 176(1))

280.40

 

(n)  for approval to amalgamate leases (Act, s 176K(1))

280.40

 

(o)  for a permit to occupy unallocated State land, a reserve or a road (Act, s 177A)

280.40

 

(p)  for—
 
 

(i)  approval to surrender a road licence (Act, s 105(3))

140.00

 

(ii)  surrender of a permit (Act, s 180A(5))

140.00

 

(iii)  surrender of freehold land (Act, s 327B)

140.00

 

(iv)  surrender of all or part of a lease (Act, s 327C(1))

140.00

 

(v)  approval to surrender the land contained in a registered owner’s deed of grant or trustee’s deed of grant in trust—change in boundaries of land (Act, s 358(2))

280.40

 

(vi)  absolute surrender of all or part of an occupation licence (Act, s 481B)

140.00

 

(q)  for approval to transfer a lease, licence or sublease (Act, s 322(3))

140.00

 

(r)  for approval to sublease a lease (Act, s 332)

140.00

 

(s)  to amend the description in a lease (Act, s 360C)

140.00

 

(t)  for approval of an easement to be created over land under section 362 of the Act (Act, s 362(1))

280.40

 

(u)  for approval of a public utility easement to continue over unallocated State land (Act, s 372(2))

140.00

 

(v)  for approval of a public utility easement that burdens a State lease to continue over a reserve (Act, s 372(3))

140.00

 

(w)  for approval to make a lease the subject of a profit a prendre (Act, s 373G)

280.40

 

(x)  for a review of an original decision mentioned in schedule 2 of the Act (Act, s 423)

140.00

3

Lodging—

 
 

(a)  a document changing the lessee of a lease, the licensee of a licence or the holder of an interest in a lease or licence—
 
 

(i)  to record the death of an individual who is a joint tenant—
(A)  for 1 lease or licence

35.00

 

(B)  for each additional lease or licence

nil

 

(ii)  other than in the circumstances mentioned in subparagraph (i)—
(A)  for 1 lease or licence

187.00

 

(B)  for each additional lease or licence

35.00

 

(b)  a request to record a change of name of an individual, or to correct the name of an individual, who is a lessee of a lease, a licensee of a licence or a holder of an interest in a lease or licence—
 
 

(i)  for 1 lease or licence

35.00

 

(ii)  for each additional lease or licence

nil

 

(c)  a surrender of a lease, trustee lease, road licence, occupation licence or permit to occupy

nil

 

(d)  a standard terms document under section 318 of the Act

nil

 

(e)  a plan of survey—
 
 

(i)  for the plan

374.00

 

(ii)  for each lot or interest surveyed or defined

28.00

 

(f)  another document

187.00

4

Examination of a sketch plan that is part of a document

35.00

5

Requisition of a document lodged or deposited

35.00

6

Issuing—

 
 

(a)  a deed of grant (other than a deed of grant issued under section 18A of the Act because of a surrender of native title, granted to the State, or issued under section 358(3)(b) of the Act )

72.55

 

(b)  a lease (other than a lease issued to the State or issued under section 18A of the Act because of a surrender of native title) or licence

72.55

 

(c)  a permit to occupy, other than a permit for a term of less than 3 months issued to a non-profit community organisation

72.55

7

Title search for—

 
 

(a)  the current details of a lease, licence, permit to occupy or a reserve, if the information is generated—
 
 

(i)  for an entity mentioned in section 284(4) of the Act

15.95

 

(ii)  otherwise

19.45

 

(b)  the historical details of a lease or licence, if the information is generated—
 
 

(i)  for an entity mentioned in section 284(4) of the Act

25.00

 

(ii)  otherwise

28.60

8

Image of—

 
 

(a)  a lease, licence or permit to occupy, if the image is generated—
 
 

(i)  for the purposes of an entity mentioned in section 284(4) of the Act

15.95

 

(ii)  otherwise

19.45

 

(b)  another document

37.90

9

Search of a statement of registered dealing or administrative advice against a lease or licence

3.20

10

Investigative search of the register (not including providing copies of documents) by an employee of the department if the search requires—

 
 

(a)  no additional computer programming time—for each hour or part of an hour

121.90

 

(b)  additional computer programming time—for each hour or part of an hour

340.30

11

Order in council, under section 216 of the Act, resuming a lease or part of a lease or taking an easement over a lease—

 
 

(a)  for 1 lease or easement or part of a lease or easement

192.50

 

(b)  for each additional lease or easement

93.75

12

Preparing and serving a notice resuming a lease or part of a lease under section 224 of the Act

93.75

13

Instrument amending an instrument resuming a lease or an easement over a lease

93.75

14

Certifying a copy of a document mentioned in section 284(1)(b) of the Act

35.35

15

Lodging a request to cancel registration of a writ of execution (Act, s 388)

nil

16

Lodging a request to register a discharge or satisfaction of a writ of execution (Act, s 389)

187.00

17

Depositing or removing an administrative advice, other than an advice deposited, or removed, by the State

28.00

18

Preparing and serving a notice of a caveat

35.00

19

Providing lodgement support service bundle 1 to an ELN in relation to a conveyancing transaction

15.95

20

Providing lodgement support service bundle 2 to an ELN in relation to a conveyancing transaction

12.60

Part 13 Amendment of Land Title Regulation 2015

35Regulation amended

This part amends the Land Title Regulation 2015.

36Replacement of sch 2 (Fees)

Schedule 2

omit, insert

Schedule 2 Fees

section 6

  

$

1

Creating an indefeasible title or, on request, a separate indefeasible title (other than a deed of grant)—for each indefeasible title created (Act, s 37 or 57)

70.00

2

Lodging—

 
 

(a)  an instrument that changes ownership of a lot or an interest in a lot—
 
 

(i)  to record the death of an individual who is a joint tenant—
 
 

(A)  for 1 lot

35.00

 

(B)  for each additional lot

nil

 

(ii)  other than in the circumstances mentioned in subparagraph (i)—

 

(A)  for 1 lot

187.00

 

(B)  for each additional lot

35.00

 

(b)  a request to record a change of name of an individual, or to correct the name of an individual, who is the owner of a lot or an interest in a lot —
 
 

(i)  for 1 lot

35.00

 

(ii)  for each additional lot

nil

 

(c)  a plan of survey or an explanatory format plan—
 
 

(i)  for the plan

374.00

 

(ii)  for each lot or interest surveyed or defined

28.00

 

(d)  for establishing a community titles scheme—a request to record the first community management statement for the scheme

187.00

 

(e)  for an established community titles scheme—a request to record a new community management statement for the scheme

91.00

 

(f)  an application—
 
 

(i)  to reserve a name as the identifying name to be shown in the community management statement for a proposed community titles scheme (a name reservation) (Act, s 115F)

91.00

 

(ii)  to extend a name reservation (Act, s 115G)

91.00

 

(iii)  to withdraw a name reservation (Act, s 115G)

nil

 

(g)  a request to record a change of the address for service of a body corporate recorded on an indefeasible title for common property

35.00

 

(h)  a request—
 
 

(i)  to cancel registration of a writ of execution (Act, s 118)

nil

 

(ii)  to register a discharge or satisfaction of a writ of execution (Act, s 119)

187.00

 

(i)  an application for a certificate of title (Act, s 42)

nil

 

(j)  a standard terms document (Act, s 169)

nil

 

(k)  a request to remove from an indefeasible title a lease or easement that has expired or a profit a prendre that has expired or otherwise ended

nil

 

(l)  a request to note the lapsing of a caveat under section 126(5) of the Act

nil

 

(m)  any other instrument

187.00

3

Additional fee for lodging a transfer if the consideration is more than $180,000—

 
 

(a)  for a transfer of a fee simple—for each $10,000 or part of $10,000 more than $180,000

35.00

 

(b)  for a transfer of a lease under the South Bank Corporation Act 1989—for each $10,000 or part of $10,000 more than $180,000

35.00

4

Examining sketch plans that are part of an instrument

35.00

5

Depositing, extending or withdrawing a priority notice (Act, ss 139, 141 and 143)

35.00

6

Depositing or removing an administrative advice, other than an advice deposited, or removed, by the State

28.00

7

Preparing and giving written notice of lodgement of a caveat (Act, s 123)

35.00

8

Requisitioning an instrument or document lodged or deposited (Act, s 156)

35.00

9

Search for—

 
 

(a)  an indefeasible title, if the information is generated—
 
 

(i)  for an entity mentioned in section 35(4) of the Act

15.95

 

(ii)  otherwise

19.45

 

(b)  the historical details of a title, if the information is generated—
 
 

(i)  for an entity mentioned in section 35(4) of the Act

25.00

 

(ii)  otherwise

28.60

10

Copy of—

 
 

(a)  a certificate of title, if the image is generated—
 
 

(i)  for an entity mentioned in section 35(4) of the Act

15.95

 

(ii)  otherwise

19.45

 

(b)  a plan of survey, if the image is generated—
 
 

(i)  for an entity mentioned in section 35(4) of the Act

17.30

 

(ii)  otherwise

20.85

 

(c)  any other instrument or document, including a community management statement

37.90

11

Search of a statement of registered dealing, community titles scheme or administrative advice against an indefeasible title

3.20

12

Investigative search of the register by an employee of the department (not including providing a copy of a document)—

 
 

(a)  if no additional computer programming time is required—for each hour or part of an hour

121.90

 

(b)  if additional computer programming time is required—for each hour or part of an hour

340.30

13

Certifying a copy of a document mentioned in section 35(1)(b) of the Act

35.35

14

Providing lodgement support service bundle 1 to an ELN in relation to a conveyancing transaction

15.95

15

Providing lodgement support service bundle 2 to an ELN in relation to a conveyancing transaction

12.60

37Regulation amended

This part amends the Mineral and Energy Resources (Common Provisions) Regulation 2016.

38Replacement of sch 2 (Fees)

Schedule 2

omit, insert

Schedule 2 Fees

section 61

$

1

Lodging a caveat over a resource authority (Act, s 25(1)(c))—

133.80

2

Registration of an associated agreement (Act, s 33(3))—

50.00

3

Application for registration of a prescribed dealing other than an assessable transfer (Act, s 19(3))—

(a)  if the dealing is a change to the resource authority holder’s name

50.00

(b)  if the dealing is a dealing mentioned in section 4(1)(b), (c), (d) or (f)—

 

(i)  for a mining claim under the Mineral Resources Act

50.00

 

(ii)  otherwise

133.80

4

Application for an indicative approval of a proposed prescribed dealing that is an assessable transfer (Act, s 23(3))—

(a)  for a resource authority, or a share in a resource authority, under the Mineral Resources Act—

 

(i)  for a mining claim

50.00

 

(ii)  for an exploration permit—

 

(A)  for coal

375.40

 

(B)  for a mineral other than coal and only if the permit is for not more than 4 sub-blocks in restricted areas 256 to 265

93.85

 

(C)  otherwise

281.60

 

(iii)  for a mineral development licence

748.00

 

(iv)  for a mining lease—

 

(A)  for coal

1,314.00

 

(B)  for corundum, gemstones and other precious stones

229.30

 

(C)  for eluvial, colluvial and alluvial gold and eluvial, colluvial and alluvial tin

229.30

 

(D)  for any other mineral

458.50

(b)  for a resource authority, or a share in a resource authority, under the P&G Act—

 

(i)  for an authority to prospect

748.00

 

(ii)  for a petroleum lease, pipeline licence or petroleum facility licence

1,314.00

 

(iii)  otherwise

562.00

(c)  for a resource authority, or a share in a resource authority, under the 1923 Act—

 

(i)  for an authority to prospect

748.00

 

(ii)  for a lease

1,314.00

 

(iii)  for a water monitoring authority

562.00

(d)  for a resource authority, or a share in a resource authority, under the Geothermal Act

378.30

(e)  for a resource authority, or a share in a resource authority, under the Greenhouse Gas Act

402.00

5

Application for registration of a prescribed dealing that is an assessable transfer (Act, s 19(3))—

(a)  for a resource authority, or a share in a resource authority, under the Mineral Resources Act—

 

(i)  for a mining claim

50.00

 

(ii)  for an exploration permit if the Minister has given an indicative approval of the transfer

178.00

 

(iii)  for an exploration permit if the Minister has not given an indicative approval of the transfer—

 

(A)  for coal

553.40

 

(B)  for a mineral other than coal and only if the permit is for not more than 4 sub-blocks in restricted areas 256 to 265

271.85

 

(C)  otherwise

459.60

 

(iv)  for a mineral development licence if the Minister has given an indicative approval of the transfer

178.00

 

(v)  for a mineral development licence if the Minister has not given an indicative approval of the transfer

926.00

 

(vi)  for a mining lease if the Minister has given an indicative approval of the transfer

178.00

 

(vii)  for a mining lease if the Minister has not given an indicative approval of the transfer—

 

(A)  for coal

1,492.00

 

(B)  for corundum, gemstones and other precious stones

407.30

 

(C)  for eluvial, colluvial and alluvial gold and eluvial, colluvial and alluvial tin

407.30

 

(D)  for any other mineral

636.50

(b)  for a resource authority, or a share in a resource authority, under the P&G Act—

 

(i)  if the Minister has given an indicative approval of the transfer

178.00

 

(ii)  otherwise—

 

(A)  for an authority to prospect

926.00

 

(B)  for a petroleum lease, pipeline licence or petroleum facility licence

1,492.00

 

(C)  for any other resource authority under the P&G Act

740.00

(c)  for a resource authority, or a share in a resource authority, under the 1923 Act—

 

(i)  if the Minister has given an indicative approval of the transfer

178.00

 

(ii)  otherwise—

 

(A)  for an authority to prospect

926.00

 

(B)  for a lease

1,492.00

 

(C)  for a water monitoring authority

740.00

(d)  for a resource authority, or a share in a resource authority, under the Geothermal Act—

 

(i)  if the Minister has given an indicative approval of the transfer

178.00

 

(ii)  otherwise

556.30

(e)  for a resource authority, or a share in a resource authority, under the Greenhouse Gas Act—

 

(i)  if the Minister has given an indicative approval of the transfer

178.00

 

(ii)  otherwise

580.00

6

Fee to search and take extracts from, or obtain a copy of all or part of a notice, document or information in, the register (Act, s 198(1)(b) and (c))—

(a)  relating to a resource authority under the Mineral Resources Act—

 

(i)  for a standard departmental public tenure enquiry report

52.15

 

(ii)  otherwise

52.15

(b)  relating to a resource authority under the P&G Act, 1923 Act or Greenhouse Gas Act—

 

(i)  for a standard departmental public tenure enquiry report

52.15

 

(ii)  otherwise

130.80

(c)  relating to a resource authority under the Geothermal Act—

 

(i)  for a standard departmental public tenure enquiry report

12.20

 

(ii)  otherwise

28.10

39Regulation amended

This part amends the Mineral Resources Regulation 2013.

40Replacement of sch 4 (Rental payable)

Schedule 4

omit, insert

Schedule 4 Rental payable

section 98

  

$

1

For a mining claim

nil

2

For an exploration permit—for each sub-block to which the exploration permit applies

161.30

3

For a mineral development licence—for each hectare to which the development licence relates—

 
 

(a)  for the first year of the licence

4.45

 

(b)  for the second year of the licence

9.20

 

(c)  for the third year of the licence

14.10

 

(d)  for the fourth year of the licence

24.30

 

(e)  for a year of the licence after the fourth year

29.25

4

For a mining lease—for each hectare to which the mining lease relates

62.30

41Amendment of sch 5 (Fees)

(1)Schedule 5, parts 1 to 6—

omit, insert

Part 1 Prospecting permits

  

$

1

Application for district prospecting permit—for each month of the term of permit applied for (Act, s 21)

130.80

2

Application for parcel prospecting permit (Act, s 21)

130.80

Part 2 Mining claims

  

$

1

Application for grant of mining claim (Act, s 61)

392.80

2

Application for renewal of mining claim (Act, s 93)

392.80

3

Application for approval to mine specified minerals not specified in mining claim (Act, s 105)

52.15

4

Lodging notice of surrender of mining claim (Act, s 107)

52.15

5

Application for variation of the land used or proposed to be used as access in relation to land the subject of mining claim (Act, s 125)

52.15

Part 3 Exploration permits

  

$

1

Application for exploration permit (Act, s 133)—

 
 

(a)  for coal

1,308.00

 

(b)  for any mineral other than coal—
 
 

(i)  for 4 or fewer sub-blocks in restricted area 256, 257, 258, 259, 260, 261, 262, 263, 264 or 265

327.40

 

(ii)  otherwise

978.00

2

Application for renewal of exploration permit (Act, s 147)—

 
 

(a)  for coal

652.00

 

(b)  for any mineral other than coal—
 
 

(i)  for 4 or fewer sub-blocks in restricted area 256, 257, 258, 259, 260, 261, 262, 263, 264 or 265

196.10

 

(ii)  otherwise

652.00

Part 4 Mineral development licences

  

$

1

Application for grant of mineral development licence (Act, s 183)—

 
 

(a)  for coal

2,619.00

 

(b)  for any mineral other than coal

2,619.00

2

Application for renewal of mineral development licence (Act, s 197)—

 
 

(a)  for coal

915.00

 

(b)  for any mineral other than coal

915.00

3

Adding another mineral to mineral development licence (Act, s 208)

652.00

4

Lodging notice of surrender of mineral development licence (Act, s 210)

196.10

5

Application for variation of the land used or proposed to be used as access in relation to land the subject of mineral development licence (Act, s 231)

458.40

Part 5 Mining leases

  

$

1

Obtaining copy of mining lease application (s 20(2))

52.15

2

Application for grant of mining lease (Act, s 245(1)(p)(iii))—

 
 

(a)  for coal

4,584.00

 

(b)  for corundum, gemstones and other precious stones

817.00

 

(c)  for eluvial, colluvial and alluvial gold and eluvial, colluvial and alluvial tin

817.00

 

(d)  for any other mineral

1,634.00

3

Application for renewal of mining lease (Act, s 286)—

 
 

(a)  for coal

4,584.00

 

(b)  for corundum, gemstones and other precious stones

817.00

 

(c)  for eluvial, colluvial and alluvial gold and eluvial, colluvial and alluvial tin

817.00

 

(d)  for any other mineral

1,634.00

4

Application for approval to mine specified minerals (other than coal seam gas) not specified in mining lease (Act, s 298(2))

652.00

5

Application to add a purpose (other than mining of minerals) to mining lease granted for purposes other than the mining of minerals (Act, s 298(5))

652.00

6

Application to add a purpose to mining lease granted for mining of minerals (Act, s 298(7))

652.00

7

Application for grant of a mining lease consolidating mining leases other than coal mining leases or oil shale mining leases (Act, s 299(2))

652.00

8

Lodging notice of surrender of mining lease (Act, s 309(2)(c))

196.10

9

Application for variation of the land used or proposed to be used as access in relation to land the subject of mining lease (Act, s 317(2)(b))

458.40

10

Application for indicative approval of an application transfer (Act, s 318AAR(2)(c)(ii))—

 
 

(a)  for coal

1,314.00

 

(b)  for corundum, gemstones and other precious stones

229.30

 

(c)  for eluvial, colluvial and alluvial gold and eluvial, colluvial and alluvial tin

229.30

 

(d)  for any other mineral

458.50

11

Application for approval of an application transfer (Act, s 318AAS(2)(c))—

 
 

(a)  if the Minister has given an indicative approval of the transfer

178.00

 

(b)  otherwise—
 
 

(i)  for coal

1,492.00

 

(ii)  for corundum, gemstones and other precious stones

407.30

 

(iii)  for eluvial, colluvial and alluvial gold and eluvial, colluvial and alluvial tin

407.30

 

(iv)  for any other mineral

636.50

Part 6 Fees relating to chapter 8 of the Act

  

$

1

Application for amendment of relinquishment condition (Act, s 318DC(g))

1,308.00

2

Application for grant of a mining lease consolidating coal mining leases or oil shale mining leases (Act, s 318DM(2)(b))

1,308.00

3

Lodging proposed later development plan within the time required under section 318EB(3) of the Act (Act, s 318EB(6), definition relevant fee)

1,308.00

4

Lodging proposed initial development plan for a lease (Act, s 758(2)(b))

1,308.00

(2)Schedule 5, part 8—

omit, insert

Part 8 Other fees

  

$

 

Duplicate of mining tenement (Act, s 389)—

 
 

(a)  for a prospecting permit

52.15

 

(b)  for a mining claim

52.15

 

(c)  for an exploration permit

52.15

 

(d)  for a mineral development licence

52.15

 

(e)  for a mining lease

52.15

42Regulation amended

This part amends the Mining and Quarrying Safety and Health Regulation 2017.

43Replacement of sch 6 (Fees)

Schedule 6
omit, insert—

Schedule 6 Fees

sections 11C(2), 11F(4) and 151

Part 1 Board of examiners fees

  

$

1

Application for assessment for a first class certificate of competency

42.45

2

Issuing a duplicate certificate of competency to replace a lost, destroyed or defaced certificate

8.20

Part 2 Other fees

  

$

1

Safety and health fee—

 

(a)  if the number of workers working at the mine during a financial year is more than 5 but not more than 10—for each worker working at the mine during the financial year

114.70

 

(b)  if the number of workers working at the mine during a financial year is more than 10—for each worker working at the mine during the financial year

911.00

2

Fee for a late safety and health census

114.70

44Regulation amended

This part amends the Petroleum and Gas (General Provisions) Regulation 2017.

45Replacement of schs 2–3

Schedules 2 and 3—
omit, insert—

Schedule 2 Fees payable under 2004 Act

section 64(1)

Part 1 Petroleum tenure fees

  

$

1

Tender for authority to prospect—2004 Act, s 37(d)(i)

2,619.00

2

Application for approval to amend the work program for an authority to prospect—2004 Act, s 60(4)

1,308.00

3

Lodgement of a proposed later work program within the time required under the 2004 Act, section 79(3)—2004 Act, s 79(6), definition relevant fee

1,308.00

4

Application for renewal of authority to prospect—2004 Act, s 82(1)(h)(i)

2,619.00

5

For a declaration that all or a stated part of the area of an authority to prospect is a potential commercial area for the authority—

 

(a)  application for a declaration—2004 Act, s 89(2)(b)

1,961.00

(b)  application for extension of the term of a declaration—2004 Act, s 93(2)

1,961.00

6

Application to divide an authority to prospect—2004 Act, s 104(g)

1,961.00

7

Application for approval of a special amendment—2004 Act, s 107A(3)

1,308.00

8

ATP-related application for a petroleum lease—2004 Act, s 118(f)

4,584.00

9

Lodging proposed later development plan for petroleum lease within the time required under the 2004 Act, section 159(3)—2004 Act, s 159(6) , definition relevant fee

1,308.00

10

Application for renewal of petroleum lease—2004 Act, s 162(1)(f)(i)

4,584.00

11

Application to divide petroleum lease—2004 Act, s 172(g)

4,584.00

12

Application to change production commencement day for petroleum lease to a new day—2004 Act, s 175AB(1)(d)

6,146.00

13

Notice of claim of ownership of stored petroleum or prescribed storage gas—2004 Act, s 213(2)(c)

1,308.00

14

Application for approval of proposed coordination arrangement—2004 Act, s 235(2)(b)(ii)

1,961.00

15

Application for amendment of relinquishment condition—2004 Act, s 372(1)(g)

1,308.00

Part 2 Data acquisition authority and water monitoring authority fees

  

$

1

Application for data acquisition authority—2004 Act, s 177(b)

1,961.00

2

Application for water monitoring authority—2004 Act, s 191(b)

1,961.00

3

Application to amend water monitoring authority—2004 Act, s 203(3)(b)

1,961.00

Part 3 Transfer fees

  

$

1

Transfer of bore in the area of a petroleum tenure to the landowner—2004 Act, s 288(3)(b)

1,961.00

2

Transfer of petroleum well in the area of a petroleum tenure to the holder of a geothermal tenure or mining tenement—2004 Act, s 289(b)

1,961.00

3

Transfer of water observation bore in the area of a petroleum tenure or water monitoring authority to the holder of another petroleum tenure or water monitoring authority—2004 Act, s 290(1)(b)

1,961.00

Part 4 Survey licence, pipeline licence and petroleum facility licence fees

  

$

1

Application for survey licence—2004 Act, s 395(2)(d)

652.00

2

Application for pipeline licence—2004 Act, s 409(f)

4,584.00

3

Handling fee to record information about completion of pipeline—2004 Act, s 420(3)(d)

196.10

4

Annual licence fee for pipeline licence—2004 Act, s 423(1)—

 
 

(a)  for a point-to-point pipeline licence (for each kilometre of the pipeline)

150.60

 

(b)  for an area pipeline licence (for each kilometre of the pipeline)

37.35

5

Annual fee for pipeline licence holder that is a proportion of the cost of the State’s funding commitments to national energy market regulation (for each kilometre of pipeline)—2004 Act, s 423(3)

291.90

6

Application for petroleum facility licence—2004 Act, s 445(e)

4,584.00

7

Annual licence fee for petroleum facility licence—2004 Act, s 454(1)—

 
 

(a)  if the petroleum facility land for the licence is 2km2 or less

3,017.00

 

(b)  if the petroleum facility land for the licence is more than 2km2 (for each square kilometre of the petroleum facility land)

1,506.00

8

Application for a part 5 permission—2004 Act, s 464(b)

978.00

9

Application to amend licence—2004 Act, s 475(b)

1,961.00

10

Application for renewal of licence other than a survey licence—Act, s 480(c)(i)

1,961.00

Part 5 General petroleum authority fees

  

$

1

Fee for required information for a petroleum tenure made available by the chief executive—2004 Act, s 550(1)(b)—

 
 

(a)  for information made available in electronic form, other than on a tape or cartridge

177.60

 

(b)  for information made available on a tape or cartridge

355.50

2

Application for approval of surrender of petroleum authority other than an authority to prospect—2004 Act, s 576(1)(b)

978.00

Schedule 3 Fees payable under 1923 Act

section 64(2)

Part 1 Petroleum tenure fees

  

$

1

Application for approval to surrender authority to prospect—1923 Act, s 21(4)(b)(i)

978.00

2

Application for approval to amend the work program for an authority to prospect—1923 Act, s 25H(3)

1,308.00

3

Application for renewal of authority to prospect—1923 Act, s 25M(1)(h)(i)

2,619.00

4

Application for renewal of lease—1923 Act, s 45(2A)(c)(i)

4,584.00

5

Application for consent to surrender and terminate lease—1923 Act, s 52(1B)(b)(i)

978.00

6

Lodgement of proposed later work program for authority to prospect within the time required under the 1923 Act, section 74K(3)—1923 Act, s 74K(6), definition relevant fee

1,308.00

7

Lodgement of proposed later development plan for lease within the time required under the 1923 Act, section 74Q(3)—1923 Act, s 74Q(6), definition relevant fee

1,308.00

8

Application for amendment of relinquishment condition—1923 Act, s 77T(1)(g)

1,308.00

Part 2 Transfer fees

  

$

1

Transfer of water observation bore or water supply bore in the area of a 1923 Act petroleum tenure to the landowner—1923 Act, s 75Q(3)(b)

1,961.00

2

Transfer of well in the area of a 1923 Act petroleum tenure to the holder of a geothermal tenure or mining tenement—1923 Act, s 75R(b)

1,961.00

3

Transfer of water observation bore in the area of a 1923 Act petroleum tenure to the holder of another 1923 Act petroleum tenure, 2004 Act petroleum tenure or water monitoring authority—1923 Act, s 75S(1)(b)

1,961.00

Part 3 Other fees

  

$

1

Fee for required information for a 1923 Act petroleum tenure made available by the chief executive—1923 Act, s 76D(1)(b)—

 
 

(a)  for information made available in electronic form, other than on a tape or cartridge

177.60

 

(b)  for information made available on a tape or cartridge

355.50

46Amendment of sch 2 (Fees payable under 2004 Act)

(1)Schedule 2, part 4, item 4—
omit, insert—

4

Annual licence fee for pipeline licence—2004 Act, s 423(1)—

 
 

(a)  for a point-to-point pipeline licence (for each kilometre of the pipeline)

155.90

 

(b)  for an area pipeline licence (for each kilometre of the pipeline)

38.65

(2)Schedule 2, part 4, item 7—
omit, insert—

7

Annual licence fee for petroleum facility licence—2004 Act, s 454(1)—

 
 

(a)  if the petroleum facility land for the licence is 2km2 or less

3,123.00

 

(b)  if the petroleum facility land for the licence is more than 2km2 (for each square kilometre of the petroleum facility land)

1,559.00

47Replacement of sch 4 (Rent)

Schedule 4
omit, insert—

Schedule 4 Rent

sections 65 and 66

Part 1 Annual rent

  

$

1

Annual rent for authority to prospect under the 2004 Act (for each sub-block included in the area for the authority)—2004 Act, s 75(1)(b)

2.90

2

Annual rent for petroleum lease under the 2004 Act (for each square kilometre of the area for the lease)—2004 Act, s 155(1)(b)

155.80

3

Annual rent for data acquisition authority (for each sub-block included in the area of the authority)—2004 Act, s 184A(1)

2.90

4

Annual rent for water monitoring authority (for each sub-block included in the area of the authority)—2004 Act, s 202A(1)

1.45

5

Annual rent for a lease under the 1923 Act (for each square kilometre of the area for the lease)—1923 Act, s 46(1)

155.80

6

Annual rent for an authority to prospect under the 1923 Act (for each sub-block included in the area for the authority)—1923 Act, s 74N(1)(b)

2.90

Part 2 Storage rent

  

$

1

Annual rent for storing petroleum or prescribed storage gas as mentioned in the 2004 Act, section 212(1)(b) (2004 Act, s 227(3)) for each square kilometre of—

 

(a)  the area for the old lease, unless paragraph (b) applies

155.80

 

(b)  for a proposed petroleum lease the area of which includes the reservoir where the petroleum is stored, if the Minister has made a call for tenders under section 218 of the 2004 Act, the area of the proposed petroleum lease stated in the call for tenders

155.80

48Regulation amended

This part amends the Petroleum and Gas (Production and Safety) Regulation 2004.

49Amendment of sch 9 (Fees)

Schedule 9, parts 6 and 7—
omit, insert—

Part 6 Gas work licence and gas work authorisation fees

  

$

1

Application for gas work licence—Act, s 728A(b)

46.05

2

Annual fee for gas work licence—s 118

30.65

3

Application for gas work authorisation—Act, s 728A(b)—

 
 

(a)  for a gas work authorisation (industrial appliances)

76.90

 

(b)  for a gas work authorisation (major project)

2,318.00

 

(c)  for a gas work authorisation (motor fuel)

76.90

 

(d)  for a gas work authorisation (servicing)

76.90

4

Annual fee for gas work authorisation—s 118—

 
 

(a)  for a gas work authorisation (industrial appliances)

46.05

 

(b)  for a gas work authorisation (major project)

2,318.00

 

(c)  for a gas work authorisation (motor fuel)

46.05

 

(d)  for a gas work authorisation (servicing)

46.05

5

Replacement of gas work licence or gas work authorisation under the Act , s 849

46.05

Part 7 Other fees mentioned in Act

  

$

1

Late fee for royalty return—Act, s 595(3)

188.75

2

Application for gas quality approval—Act, s 622(2)(b)

376.70

3

Fee for copy of a document or information held in the register of gas work licences and authorisations—Act, s 731(1)(c)

14.70

50Amendment of sch 9, pt 8, s 1 (Drilling wells)

Schedule 9, part 8, section 1(1), ‘$1,466’—

omit, insert

$1,517

51Amendment of sch 9, pt 8, s 2 (Well completion or maintenance work)

Schedule 9, part 8, section 2(1), ‘$275.80’—

omit, insert

$285.50

52Amendment of sch 9, pt 8, s 3 (Exploration)

Schedule 9, part 8, section 3(1), ‘$2.36’—

omit, insert

$2.44

53Amendment of sch 9, pt 8, s 4 (Producing petroleum under a petroleum lease or 1923 Act lease)

Schedule 9, part 8, section 4(1), ‘$1,511’—

omit, insert

$1,564

54Amendment of sch 9, pt 8, s 5 (Petroleum facilities)

(1)Schedule 9, part 8, section 5(1)(a) to (h)—

omit, insert

(a)for the operation of a major processing facility—$13,102;
(b)for the operation of a facility that produces syngas—$6,549;
(c)for a facility that produces a gasification or retorting product, other than mineral (f), by an underground gasification activity—$6,549;
(d)for the operation of a facility that produces LPG from petroleum—$9,825;
(e)for the operation of a facility that produces LNG and is not a major hazard facility under the Work Health and Safety Regulation 2011 and must operate under a safety management system—$9,825;
(f)for the operation of a facility that produces CNG and must operate under a safety management system—$4,584;
(g)for the operation of a facility that produces an underground gasification product—$13,102;
(h)for the operation of a facility on an area to which a petroleum facility licence applies that is not included in paragraphs (a) to (g)—$13,102.

(2)Schedule 9, part 8, section 5(2)(a)(i), example—

omit, insert

Example for subparagraph (i)—

If there is a facility that produces syngas and a facility that produces mineral (f) by an underground gasification activity and both facilities are operated at a single site under a single safety management system, the operator of the facilities is only required to pay a fee of $13,102 rather than fees totalling $19,651.

(3)Schedule 9, part 8, section 5(2)(b)(i), example—

omit, insert

Example for subparagraph (i)—

If there is a major processing facility that produces LPG from petroleum, the operator of the facility is only required to pay a fee of $13,102 rather than fees totalling $22,927.

55Amendment of sch 9, pt 8, s 6 (Facility used to carry out a GHG storage activity)

Schedule 9, part 8, section 6(1), ‘$12,659’—

omit, insert

$13,102

56Amendment of sch 9, pt 8, s 7 (Pipelines)

Schedule 9, part 8, section 7(1), ‘$0.0003670’—

omit, insert

$0.0003798

57Amendment of sch 9, pt 8, s 8 (Operating a distribution system)

Schedule 9, part 8, section 8, ‘$192.10’—

omit, insert

$198.80

58Amendment of sch 9, pt 8, s 10 (Particular LPG delivery network that is operating plant)

(1)Schedule 9, part 8, section 10(1)(a) to (c)—

omit, insert

(a)if the container index for the operator for the year is 10,000 or less—$2,967; or
(b)if the container index for the operator for the year is more than 10,000 but not more than 50,000—$7,125; or
(c)otherwise—$0.88 multiplied by the container index of the operator for the year.

(2)Schedule 9, part 8, section 10(2), ‘$633,064’—

omit, insert

$655,221

59Amendment of sch 9, pt 8, s 11 (Product supplier of automotive LPG)

Schedule 9, part 8, section 11, ‘$4.20’—

omit, insert

$4.35

60Amendment of sch 9, pt 8, s 12 (Tanker delivery carrier)

Schedule 9, part 8, section 12, ‘$0.42’—

omit, insert

$0.44

61Amendment of sch 9, pt 8, s 13 (Major consumer)

Schedule 9, part 8, section 13(a) to (c)—

omit, insert

(a)for a site operated by the major consumer, if the gas devices at the site have a total gas capacity of not more than 150GJ for each hour—$7,125;
(b)for a site operated by the major consumer, if the gas devices at the site have a total gas capacity of more than 150GJ but not more than 500GJ for each hour—$11,283;
(c)for a site operated by the major consumer, if the gas devices at the site have a total gas capacity of more than 500GJ for each hour—$13,657.

62Amendment of sch 9, pt 8, s 14 (Biogas or gas derived from a waste disposal tip or during treatment of sewage)

Schedule 9, part 8, section 14, ‘$4,429’—

omit, insert

$4,584

63Amendment of sch 9, pt 8, s 15 (Entertainment events)

Schedule 9, part 8, section 15, ‘$1,264’—

omit, insert

$1,308

64Amendment of sch 9, pt 8, s 16 (Late fees)

Schedule 9, part 8, section 16(1)(a) and (2), ‘$630’—

omit, insert

$652

65Regulation amended

This part amends the Stock Route Management Regulation 2003.

66Replacement of sch 2 (Fees)

Schedule 2
omit, insert—

Schedule 2 Fees

section 17

  

$

1

Permit fee for stock route agistment permit (Act, s 116(5))—

 
 

(a)  for large stock—
 
 

(i)  minimum fee, for each head, for each week

1.16

 

(ii)  maximum fee, for each head, for each week

2.80

 

(b)  for small stock—
 
 

(i)  minimum fee, for each head, for each week

0.10

 

(ii)  maximum fee, for each head, for each week

0.44

2

Permit fee for stock route travel permit (Act, s 134(3))—

 
 

(a)  for large stock—for each kilometre, for each 20 head or part of 20 head

0.02

 

(b)  for small stock—for each kilometre, for each 100 head or part of 100 head

0.02

3

Inspecting register of water facility agreements (Act, s 164(3)(a))

16.10

Part 20 Amendment of Surveyors Regulation 2014

67Regulation amended

This part amends the Surveyors Regulation 2014.

68Replacement of sch 1 (Fees)

Schedule 1

omit, insert

Schedule 1 Fees

section 8

  

$

1

Registration or registration endorsement, for an individual (Act, s 45(1)(c))—

 
 

(a)  registration as a surveyor—
 
 

(i)  application fee

176.80

 

(ii)  registration fee

219.60

 

(b)  registration endorsement as a consulting surveyor—
 
 

(i)  application fee

176.80

 

(ii)  registration fee

267.90

 

(c)  registration endorsement, other than as a consulting surveyor—
 
 

(i)  application fee

80.35

 

(ii)  registration fee

32.15

 

(d)  registration as a surveying graduate—
 
 

(i)  application fee

176.80

 

(ii)  registration fee

176.80

 

(e)  registration as a surveying associate—
 
 

(i)  application fee

176.80

 

(ii)  registration fee

160.70

 

(f)  registration as an emeritus surveyor—
 
 

(i)  application fee

85.70

 

(ii)  registration fee

nil

2

Registration and registration endorsement, for a corporation (Act, s 45(1)(c))—

 
 

(a)  registration as a surveyor with a registration endorsement as a consulting surveyor—
 
 

(i)  application fee

428.50

 

(ii)  registration fee

938.00

 

(b)  registration endorsement, other than as a consulting surveyor—
 
 

(i)  application fee

80.35

 

(ii)  registration fee

32.15

3

Renewal of registration or registration endorsement, for an individual (Act, s 54(2)(c)(ii) and (3))—

 
 

(a)   registration as a surveyor—
 
 

(i)  registration fee

219.60

 

(ii)  late application fee

80.35

 

(b)  registration endorsement as a consulting surveyor —
 
 

(i)  registration fee

267.90

 

(ii)  late application fee

nil

 

(c)  registration endorsement, other than as a consulting surveyor—
 
 

(i)  registration fee

32.15

 

(ii)  late application fee

nil

 

(d)   registration as a surveying graduate—
 
 

(i)  registration fee

176.80

 

(ii)  late application fee

80.35

 

(e)  registration as a surveying associate—
 
 

(i)  registration fee

160.70

 

(ii)  late application fee

80.35

 

(f)   registration as an emeritus surveyor—
 
 

(i)  registration fee

nil

 

(ii)  late application fee

nil

4

Renewal of registration and registration endorsement, for a corporation (Act, s 54(2)(c)(ii) and (3))—

 
 

(a)  registration fee for registration as a surveyor with a registration endorsement as a consulting surveyor

938.00

 

(b)  registration fee for registration endorsement, other than as a consulting surveyor

32.15

 

(c)  late application fee

267.90

5

Restoration of registration or registration endorsement (Act, s 60(1)(b)(i))—application fee (in addition to any fees payable under item 3 or 4)

128.30

6

Replacement or duplicate registration certificate (Act, s 78(2)(b))

91.10

7

Assessment fee for an application for competency assessment (Act, s 44(2))—

 
 

(a)  if the competency assessment involves assessing a professional assessment project—
 
 

(i)  lodging the application

176.80

 

(ii)  assessing the project

509.00

 

(b)  if the competency assessment involves reassessing a professional assessment project—
 
 

(i)  lodging the application

176.80

 

(ii)  reassessing the project

321.40

 

(c)  if the competency assessment involves assessing a person’s competence equivalence for registration or registration endorsement as a surveyor—
 
 

(i)  lodging the application

176.80

 

(ii)  assessing the person’s competence equivalence

911.00

69Regulation amended

This part amends the Valuation of Land Regulation 2003.

70Amendment of s 7 (Fee for copy of valuation roll—Act, s 203)

Section 7(1)(a), ‘$5,695’—

omit, insert

$5,894

71Amendment of s 8 (Fee for making valuation—Act, s 209)

Section 8(2), ‘$83.95’—

omit, insert

$86.90

72Replacement of schs 1 and 2

Schedules 1 and 2—

omit, insert

Schedule 1 Fee for copy of valuation roll

section 7(1)(b)

  

$

1

Business or multi-unit—for each valuation of a rateable parcel of land used or occupied

17.15

2

Other than business or multi-unit—for each valuation of a parcel of rateable land used or occupied if the area is—

 
 

(a)   less than 4,000m2

7.30

 

(b)  4,000m2 or more, but less than 20ha

7.65

 

(c)  20ha or more, but less than 40ha

10.95

 

(d)  40ha or more, but less than 200ha

14.65

 

(e)  200ha or more

20.50

Schedule 2 Fees

section 9

  

$

1

Copy of certificate of valuation

35.55

2

Certified copy of—

 
 

(a)  an extract of an entry on a valuation roll

35.55

 

(b)  an ownership change notice (including the search fee)

35.55

3

Payable by a local government for—

 
 

(a)  amendment of a valuation to be used for making and levying rates (Act, s 87, 88 or 100)

37.80

 

(b)  making a valuation under section 83(1)(a) of the Act of land in its local government area

37.80

4

Searching for particulars contained in—

 
 

(a)  an entry on the current valuation roll—
 
 

(i)  at an office of the department

17.65

 

(ii)  using electronic access

14.10

 

(b)  a notice under section 245 of the Act held on the current valuation roll—
 
 

(i)  at an office of the department

17.65

 

(ii)  using electronic access

14.10

 

(c)  an entry on a valuation roll, other than the current valuation roll

28.20

 

(d)  a notice under section 245 of the Act held on a valuation roll, other than the current valuation roll

28.20

 

(e)  an entry on a valuation roll, supplied in the form of a computer listing—
 
 

(i)  for each entry

1.00

 

(ii)  minimum fee for each listing

136.30

5

For particulars contained in a notice under section 245 of the Act—

 
 

(a)  given in an abbreviated form—for each entry

8.80

 

(b)  given as an entry in a copy of a monthly computer listing—
 
 

(i)  for each entry

1.00

 

(ii)  for a consolidated listing of entries already supplied in a monthly computer listing—for each 100 entries

7.35

 

(iii)  minimum fee for each listing, other than a consolidated listing

136.30

73Regulation amended

This part amends the Valuers Registration Regulation 2013.

74Replacement of sch 2 (Fees)

Schedule 2

omit, insert

Schedule 2 Fees

section 6

  

$

1

Application for registration as a valuer (Act, s 29(1)(c))

239.30

2

Certificate of registration (Act, s 34(1))

68.70

3

Roll fee (Act, s 36(1))

239.30

4

Late fee (Act, s 36(2))

68.70

5

Late fee (Act, s 36B(2))

68.70

6

Application for restoration of registration as a valuer (Act, s 40(2))

239.30

7

Application to be recorded as a specialist retail valuer (Act, s 42B(2))

239.30

8

Renewal of recording as a specialist retail valuer on the list kept by the board (Act, s 42FA(a))

239.30

9

Application for restoration of valuer’s particulars on list of specialist retail valuers (Act, s 42GB(2)(b))

68.70

75Regulation amended

This part amends the Vegetation Management Regulation 2012.

76Replacement of sch 7 (Fees)

Schedule 7

omit, insert

Schedule 7 Fees

section 12

  

$

1

Application for making a PMAV (Act, s 20C(2)(c))

449.20

2

Preparing a restoration plan (Act, s 55AB(4))—

 
 

(a)  if a field visit is not required

913.00

 

(b)  if a field visit is required

3,924.00

Part 24 Amendment of Water Regulation 2016

77Regulation amended

This part amends the Water Regulation 2016.

78Replacement of schs 12–16

Schedules 12 to 16—

omit, insert

Schedule 12 Fees

section 130

  

$

1

Application for a water allocation dealing (s 158 of the Act and s 63(b))

130.30

2

Application for a seasonal water assignment (s 58(3)(b))—

 

(a)  for a water allocation

173.80

 

(b)  for a seasonal water assignment notice

173.80

3

Creating, on request, a title or separate title for a water allocation, other than under section 146 or 147 of the Act—for each title created (Act, ss 168(2)(d) and 170(1))

70.00

4

Lodging in the registry an instrument that changes ownership of a water allocation or an interest in a water allocation (Act, ss 168(2)(d) and 170(1))—

 
 

(a)  if lodgement is to record the death of an individual—
 
 

(i)  for 1 water allocation

35.00

 

(ii)  for each additional water allocation

nil

 

(b)  if lodgement is with an instrument changing ownership of a lot or an interest in a lot, other than in the circumstances mentioned in paragraph (a)—for each water allocation

35.00

 

(c)  otherwise—
 
 

(i)  for 1 water allocation

187.00

 

(ii)  for each additional water allocation

35.00

5

Lodging in the registry a certificate of a dealing with a water allocation (Act, s 168(2)(d))

187.00

6

Lodging in the registry a request to record the change of name of an individual or to correct the name of an individual, for a water allocation or an interest in a water allocation (Act, ss 168(2)(d) and 170(1))—

 

(a)   for 1 water allocation

35.00

 

(b)  for each additional water allocation

nil

7

Lodging in the registry—

 
 

(a)  a cancellation of a writ of execution (Act, ss 168(2)(d) and 170(1))

nil

 

(b)  a discharge or satisfaction of a writ of execution (Act, ss 168(2)(d) and 170(1))

187.00

8

Lodging a standard terms document in the registry (Act, ss 168(2)(d) and 170(1))

nil

9

Lodging in the registry a request to remove from the title of a water allocation a lease that has expired or otherwise ended (Act, ss 168(2)(d) and 170(1))

nil

10

Lodging in the registry a request to note the lapsing of a caveat (Act, ss 168(2)(d) and 170(1))

nil

11

Lodging any other instrument in the registry (Act, ss 168(2)(d) and 170(1))

187.00

12

Depositing in, extending, or withdrawing from, the registry a priority notice (Act, ss 168(2)(d) and 170(1))

35.00

13

Depositing in, or removing from, the registry an administrative advice, other than an advice deposited, or removed, by the State (Act, ss 168(2)(d) and 170(1))

28.00

14

Preparing and serving, by the registry, a notice of a caveat (Act, ss 168(2)(d) and 170(1))

35.00

15

Search for (Act, s 168(2)(d))—

 
 

(a)  a current title for a water allocation generated—
 
 

(i)  in an office of the registry

19.45

 

(ii)  by external access

15.95

 

(b)  the historical details of a title generated—
 
 

(i)  in an office of the registry

28.60

 

(ii)  by external access

25.00

16

Image of (Act, s 168(2)(d))—

 
 

(a)  a title for a water allocation generated—
 
 

(i)  in an office of the registry

19.45

 

(ii)  by external access

15.95

 

(b)  another instrument lodged or deposited in the registry

37.90

17

Search, in the registry, of a statement of a registered dealing or an administrative advice against a title (Act, s 175)

3.20

18

Investigative search, by the registrar, of the register (not including providing copies of documents) (Act, s 168(2)(d))—

 
 

(a)  if no additional computer programming time is required—for each hour or part of an hour

121.90

 

(b)  if additional computer programming time is required—for each hour or part of an hour

340.30

19

Certifying, by the registrar, of a copy of the title of a water allocation or a registered instrument (Act, ss 168(2)(d) and 175)

35.35

20

Requisitioning an instrument or document lodged or deposited (Act, ss 168(2)(d) and 175)

35.00

21

Application for water licence (Act, s 110(b))

130.30

22

Application for a dealing with a water licence to renew the licence (Act, s 122)

nil

23

Application for a dealing with a water licence to relocate the licence (Act, s 122)

382.70

24

Application for a dealing with a water licence for a seasonal water assignment notice for a seasonal water assignment (Act, s 122)

173.80

25

Application for 1 or more other dealings with a water licence (Act, s 122)

130.30

26

Application for an allocation of quarry material (Act, s 227(2)(c))—for each 6 month period, or part of a 6 month period, the allocation notice has effect

178.60

27

Application to renew an allocation notice (Act, s 236(2)(b))—for each 6 month period, or part of a 6 month period, the renewed allocation notice has effect

178.60

28

Application for a water bore driller’s licence (Act, s 981(2)(e))—

 
 

(a)  if the applicant relies on section 124(2)(c)(iii) or (iv)

1,054.00

 

(b)  if the applicant relies on section 125(2)(c)(iii) or (iv)

1,540.00

 

(c)  if the applicant relies on section 126(2)(c)(iii) or (iv)

1,865.00

 

(d)  if paragraphs (a) to (c) do not apply

587.00

29

Application to amend a water bore driller’s licence (Act, ss 981 and 983B(2))

173.80

30

Application to renew a water bore driller’s licence (Act, s 983F(2)(c))

564.00

31

Application to reinstate an expired water bore driller’s licence (Act, s 983G(2)(b))

587.00

32

Application for an operations licence (Act, s 206(2)(d))

130.30

33

Computer printout of a document available for inspection under section 1009(3) of the Act generated (Act, s 1009)—

 
 

(a)  at an office of the department

17.65

 

(b)  by external access

14.10

34

Certifying a copy of a document available for inspection under section 1009(3) of the Act (Act, s 1009)

36.05

35

Water licence fee (Act, s 1014(2)(a))—for each year

82.00

36

Investigative search, by the chief executive, of the department’s water entitlement database (not including providing copies of documents) (Act, s 1014(2)(a))—

 
 

(a)  if no additional computer programming time is required—for each hour or part of an hour

72.55

 

(b)  if additional computer programming time is required—for each hour or part of an hour

179.30

37

Copy of a report on an entry in the department’s water entitlement database (Act, s 1014(2)(a))

8.65

38

Testing a water meter (Act, s 1014(2)(a))—for each hour

75.65

39

Reading a water meter (Act, s 1014(2)(a))—

 
 

(a)  for 1 water meter

84.15

 

(b)  for each additional water meter on the same or an adjacent property

16.55

Schedule 13 Fees for continuing interim water allocations

section 132

  

$

1

Application under section 193 of the unamended Act to transfer all or part of a continuing interim water allocation

382.70

2

Application under section 195 of the unamended Act to transfer all or part of a continuing interim water allocation—

 

(a)  for 1 application

382.70

 

(b)  for each additional application, made at the same time, to transfer to the same land

84.15

3

Application under section 198 of the unamended Act to replace jointly held continuing interim water allocation

130.30

4

Application under section 216 of the unamended Act to amend continuing interim water allocation

130.30

5

Application under section 224 of the unamended Act to amalgamate continuing interim water allocations

130.30

6

Application under section 225 of the unamended Act to replace continuing interim water allocation with 2 or more new continuing interim water allocationsNote—

For items 4, 5 and 6 see section 192 of the unamended Act.

130.30

Schedule 14 Water charges

section 133

Column 1

Column 2

Column 3

Water management area

Date water year ends

Water charges

Barker–Barambah Creeks water management area

30 June

Water harvesting—$4.60 for each megalitre

Barron River–Emerald Creek water management area

30 June

Water harvesting—

(a)  from Tinaroo Falls Dam or Barron River—$4.60 for each megalitre
(b)  from Emerald Creek above AMTD 14.300—$4.60 for each megalitre
(c)  from any other watercourse—$4.60 for each megalitre

Border Rivers water management area

30 June

Water harvesting—$4.60 for each megalitre

Bowen–Broken Rivers water management area

30 June

Water harvesting—$4.60 for each megalitre

Boyne and Stuart Rivers water management area

30 June

Water harvesting—$4.60 for each megalitre

Central Lockyer water management area

30 June

Water harvesting—$4.60 for each megalitre

Chinchilla Weir water management area

31 August

Water harvesting—$4.60 for each megalitre

Dawson Valley water management area

30 September

Water harvesting from zone Dawson B to M as identified in the Fitzroy Basin water management protocol—$4.60 for each megalitre

Dumaresq River water management area

30 June

Water from a watercourse flowing from Glenlyon Dam—

(a)  part A—$11.55
(b)  part B—$14.15

Fitzroy water management area

30 June

Water harvesting from zone Fitzroy A as identified in the Fitzroy Basin water management protocol—$4.60 for each megalitre

Logan River water management area

30 June

Water harvesting from Burnett Creek or Logan River—$4.60 for each megalitre

Lower Balonne water management area

30 June

Water harvesting—

(a)  from a supplemented section of the Thuraggi watercourse or Thuraggi diversion channel—$4.60 for each megalitre
(b)  from Beardmore Dam or from any watercourse downstream of Beardmore Dam to the Queensland/New South Wales border—$4.60 for each megalitre

Lower Burnett and Kolan Rivers water management area

30 June

Water harvesting—$4.60 for each megalitre

Lower Lockyer water management area

30 April

Water harvesting—$4.60 for each megalitre

Macintyre Brook water management area

30 June

Water harvesting—$4.60 for each megalitre

Nogoa Mackenzie water management area

30 June

Water harvesting from Lake Maraboon or Nogoa River or Mackenzie River to the junction with Springton Creek—$4.60 for each megalitre

Pioneer River water management area

30 June

Water harvesting from zones Cattle 01, Cattle 02, Pioneer 01, Pioneer 02, Pioneer 03, Pioneer 04 or Silver/McGregor 01 identified in the Water Plan (Pioneer Valley) 2002—$4.60 for each megalitre

Three Moon Creek water management area

30 June

Water harvesting—$4.60 for each megalitre

Upper Burnett and Nogo Rivers water management area

30 June

Water harvesting from Nogo River or Burnett River—$4.60 for each megalitre

Upper Condamine water management area

30 June

Water harvesting from zones UCU-03 (excluding the ponded area of Leslie Dam), UCU-04, UCU-05, UCU-06, UCU-07, UCU-08, UCU-09 or UCU-11 identified in the Condamine and Balonne water management protocol—$4.60 for each megalitre

Warrill Valley water management area

30 June

Water harvesting—

(a)  from Reynolds Creek, Warrill Creek from its junction with Reynolds Creek or Bremer River from the junction of Warrill Creek downstream to Berry’s Lagoon—$4.60 for each megalitre
(b)  from Black Gully, Kent’s Lagoon, Normanby Gully, West Branch, Waroolaba Creek or the Upper Warrill systems—$4.60 for each megalitre

Schedule 15 Royalties

section 135

  

$

 

Removing State quarry material—for each cubic metre removed—

 
 

(a)  by a local government or other entity established under an Act and that does not represent the State (a statutory body), for its own use

0.75

 

(b)  by another person for a statutory body if the statutory body issues a certificate stating that the material was supplied to the statutory body for its own use

0.75

 

(c)  if paragraphs (a) and (b) do not apply

2.17

Schedule 16 Drainage rates

section 136

Drainage area

Drainage rate

Burdekin River drainage area, shown on AP4064

$28.10 for each hectare of land

Dawson Valley drainage area, shown on AP4145

$28.10 for each hectare of land

Emerald drainage area, shown on AP4146

$28.10 for each hectare of irrigable land

$6.85 for each hectare of non-irrigable land

St George drainage area, shown on AP4150

$28.10 for each hectare of irrigable land