Minister: Minister for Energy, Renewables and Hydrogen and Minister for Public Works and Procurement
Agency: Department of Energy and Public Works


Building Industry Fairness (Security of Payment) Act 2017

Effective Date Publication Date Amendments Included Notes
10 November 2017 18 January 2018

certain provs commenced, RA ss 7(1)(k), 26, 35, 40, 42A

01 March 2018 17 May 2018

certain provs commenced

11 September 2018 20 September 2018 2018 Act No. 17

certain provs commenced

11 November 2018 06 December 2018

certain provs commenced

RA s 40

17 December 2018 18 December 2018

certain provs commenced

RA ss 7(1)(k), 40

01 January 2019 20 December 2018

certain provs commenced

RA s 40

01 July 2019 24 July 2019 2018 Act No. 17
11 November 2019 12 November 2019

RA ss 7(1)(k), 40

18 December 2019 17 December 2019

s 211 exp 17 December 2019

27 August 2020 30 August 2020 2020 Act No. 24
01 October 2020 05 February 2021 2020 Act No. 24
01 March 2021 02 March 2021 2020 Act No. 24

RA s 30

01 July 2021 30 June 2021

provs commenced, RA ss 7(1)(k), 40

01 January 2022 23 December 2021

provs commenced, RA ss 7(1)(k), 40

10 June 2022 13 June 2022 2022 Act No. 11
01 March 2023 28 February 2023 2022 Act No. 34
01 February 2024 31 January 2024 2023 Act No. 23

Building Industry Fairness (Security of Payment) Act 2017 No. 43

date of assent 10 November 2017

ss 12, ch 9 pt 1 div 1, ch 9 pts 2–3, ss 250–256, 260–265, 266(2) and (3), 267(2) and (3), 270–285, 288–297, 299–303 and 305, 307(2) (other than to the extent it ins new def minimum financial requirements) comm on date of assent (see s 2(1))

s 296(2) comm on date of assent (see s 2(1)) (amdt could not be given effect)

ch 1 (other than ss 1, 2 and 3(2)(b)–(d)), ch 2, ch 6, ch 7 (other than s 201(2)(b)–(g), s 211 (other than s 211(1)(a)(ii) and (5), s 307(1) (other than to the extent it om def demerit matter), sch 2 comm 1 March 2018 (see s 2 and 2018 SL No. 15)

ch 8 pt 1A comm 11 September 2018 (see s 2(1A))

s 307(1) (to the extent it om def demerit matter) not yet proclaimed into force and om 11 September 2018 (see 2018 Act No. 17 s 176ZT)

s 303A comm 11 November 2018 (automatic commencement under AIA s 15DA(2))

ss 3(2)(b)–(d), chs 3–5, s 201(2)(b)–(g), ch 8 (other than pt 1A, s 211(1)(a)(i), (b), (2)–(4A)), ss 278, 304(2), 306, ch 9 pt 5, sch 1 comm 17 December 2018 (2018 SL No. 176))

ss 257–259, 266(1), 267(1), 268—269, 286–287, 298, 304(1), 307(2) (to the extent it ins new def minimum financial requirements) comm 1 January 2019 (2018 SL No. 219) (proposed commencement 11 November 2019 (automatic commencement under AIA s 15DA(2) (2018 SL No. 178))

s 281 comm 11 November 2019 (automatic commencement under AIA s 15DA(2) (2018 SL No. 178))

ch 9 pt 1 div 1 comm 1 July 2021 (2020 SL No. 159 item 1)

ch 9 pt 1 div 2 comm 1 January 2022 (2020 SL No. 159 item 2)

ch 9 pt 1 div 3 comm 1 March 2025 (2023 SL No. 16 item 1) (prev proclamation 2022 SL No. 31 item 1 rep 2023 SL No. 17) (orig proclamation 2020 SL No. 159 rep 2022 SL No. 30)

ch 9 pt 1 div 4 comm 1 October 2025 (2023 SL No. 16 item 2) (prev proclamation 2022 SL No. 31 item 2 rep 2023 SL No. 17) (orig proclamation 2020 SL No. 159 rep 2022 SL No. 30)

Note—AIA s 15DA does not apply to ch 9 pt 1 divs 1–4 (see s 2(2))

Building Industry Fairness (Security of Payment) Act 2017 No. 43

date of assent 10 November 2017

ss 1–2, prev ch 9 pt 1 div 1 comm on date of assent (see s 2(1))

pres ch 9 pt 1 div 1 comm 1 July 2021 (2020 SL No. 159 item 1)

ch 9 pt 1 div 2 comm 1 January 2022 (2020 SL No. 159 item 2)

ch 9 pt 1 div 3 comm 1 April 2023 (2022 SL No. 31 item 1) (prev proclamation 2020 SL No. 159 rep 2022 SL No. 30)

ch 9 pt 1 div 4 comm 1 October 2023 (2022 SL No. 31 item 2) (prev proclamation 2020 SL No. 159 rep 2022 SL No. 30)

Note—AIA s 15DA does not apply to ch 9 pt 1 divs 1–4 (see s 2 (2))

Plumbing and Drainage Act 2018 No. 17

date of assent 11 September 2018

pt 9 div 1A (other than s 176F (2)), ss 192A–192K, 193A–193G, 196 (3)–(6), sch 2 (amdts of Building Industry Fairness (Security of Payment) Act 2017) comm on date of assent (see s 2 (1))

pt 1 div 1 (other than ss 12), div 2, pts 27, pt 8 div 1, ss 159173, 174, pt 9 div 1, s 176F (2), pt 9 div 2, div 4, sch 1, sch 2 (other than amdts of Building Industry Fairness (Security of Payment) Act 2017) comm 1 July 2019 (2019 SL No. 41)

Building Industry Fairness (Security of Payment) and Other Legislation Amendment Act 2020 No. 24

date of assent 23 July 2020

pt 4 hdg, ss 60–61, 83 comm 27 August 2020 (2020 SL No. 158 item 1)

ss 64–75, 77–79, 80 (other than to the extent it ins s 200D(1)(a)), 82 (other than to the extent it ins ss 211B–211D), 84(1) (to the extent it om def construction work), (2) (to the extent it ins defs approved way, construction work, financial institution, head contractor, payment withholding request, registrar of titles) comm 1 October 2020 (2020 SL No. 158 item 2)

ss 62–63, 76, 80 (to the extent it ins s 200D(1)(a)), 81, 82 (to the extent it ins ss 211B–211D), 84(1) (other than to the extent it om def construction work), (2) (other than to the extent it ins defs approved way, construction work, financial institution, head contractor, payment withholding request, registrar of titles) comm 1 March 2021 (2020 SL No. 158 item 4)

Building and Other Legislation Amendment Act 2022 No. 11

date of assent 10 June 2022

pt 4 comm on date of assent

Public Sector Act 2022 No. 34

date of assent 12 December 2022

s 364 sch 3 comm 1 March 2023 (see s 2)

Justice and Other Legislation Amendment Act 2023 No. 23

date of assent 20 September 2023

s 247 sch 1 ss 2(3), 4 comm 1 February 2024 (2024 SL No. 1)

Building Industry Fairness (Security of Payment) and Other Legislation Amendment Bill 2024

This is a consolidated list of all history notes in this reprint. Show or hide the list by using the Turn history notes on/off button at the top of the page. The complete list can be printed (Ctrl-P) from the screen when the history notes are turned on.

Long title amd 2017 No. 43 s 213

s 2 amd 2018 No. 17 s 176B; 2020 No. 24 s 61

s 3 amd 2020 No. 24 s 62

ch 2 hdg sub 2020 No. 24 s 63

ch 2 pt 1 hdg sub 2020 No. 24 s 63

s 7 sub 2020 No. 24 s 63

s 8 sub 2020 No. 24 s 63

s 8A ins 2020 No. 24 s 63

s 8B ins 2020 No. 24 s 63

s 9 amd 2018 No. 17 s 176D

sub 2020 No. 24 s 63

ch 2 pt 2 hdg sub 2020 No. 24 s 63

ch 2 pt 2 div 1 hdg sub 2020 No. 24 s 63

s 10 sub 2020 No. 24 s 63

s 10A ins 2018 No. 17 s 176E

sub 2020 No. 24 s 63

s 10B ins 2020 No. 24 s 63

s 10C ins 2020 No. 24 s 63

ch 2 pt 2 div 2 hdg sub 2020 No. 24 s 63

s 11 amd 2018 No. 17 s 176F

sub 2020 No. 24 s 63

s 11A ins 2020 No. 24 s 63

s 11A ins 2020 No. 24 s 63

ch 2 pt 2 div 3 hdg sub 2020 No. 24 s 63

ch 2 pt 2 div 3 sdiv 1 hdg ins 2020 No. 24 s 63

s 12 sub 2020 No. 24 s 63

amd 2017 No. 43 s 214

s 13 om 2020 No. 24 s 63

ch 2 pt 2 div 3 sdiv 2 hdg ins 2020 No. 24 s 63

s 14 sub 2020 No. 24 s 63

amd 2017 No. 43 ss 213, 215

s 14A ins 2020 No. 24 s 63

s 14B ins 2020 No. 24 s 63

s 14C ins 2020 No. 24 s 63

s 14D ins 2020 No. 24 s 63

s 14E ins 2020 No. 24 s 63

ch 2 pt 2 div 3 sdiv 3 hdg ins 2020 No. 24 s 63

s 15 sub 2020 No. 24 s 63

s 15A ins 2020 No. 24 s 63

s 15B ins 2020 No. 24 s 63

s 15C ins 2020 No. 24 s 63

s 15D ins 2020 No. 24 s 63

s 15E ins 2020 No. 24 s 63

s 15F ins 2020 No. 24 s 63

s 16 om 2020 No. 24 s 63

ch 2 pt 2 div 4 hdg ins 2020 No. 24 s 63

ch 2 pt 2 div 4 sdiv 1 hdg ins 2020 No. 24 s 63

s 17 sub 2020 No. 24 s 63

ch 2 pt 2 div 4 sdiv 2 hdg ins 2020 No. 24 s 63

s 18 sub 2020 No. 24 s 63

s 18A ins 2020 No. 24 s 63

s 18B ins 2020 No. 24 s 63

s 18C ins 2020 No. 24 s 63

ch 2 pt 2 div 4 sdiv 3 hdg ins 2020 No. 24 s 63

s 19 amd 2018 No. 17 s 176G

sub 2020 No. 24 s 63

s 19A ins 2020 No. 24 s 63

ch 2 pt 2 div 4 sdiv 4 hdg ins 2020 No. 24 s 63

s 20 sub 2020 No. 24 s 63

s 20A ins 2020 No. 24 s 63

s 20B ins 2020 No. 24 s 63

s 20C ins 2020 No. 24 s 63

ch 2 pt 2 div 4 sdiv 5 hdg ins 2020 No. 24 s 63

s 21 sub 2020 No. 24 s 62

s 21A ins 2020 No. 24 s 63

s 22 om 2020 No. 24 s 63

ch 2 pt 2 div 5 hdg ins 2020 No. 24 s 63

s 23 amd 2018 No. 17 s 176H

sub 2020 No. 24 s 63

s 23A ins 2020 No. 24 s 63

s 23B ins 2020 No. 24 s 63

ch 2 pt 2 div 6 hdg ins 2020 No. 24 s 63

s 24 sub 2020 No. 24 s 63

s 24A ins 2020 No. 24 s 63

ch 2 pt 2 div 7 hdg ins 2020 No. 24 s 63

s 25 amd 2018 No. 17 s 176I

sub 2020 No. 24 s 63

s 25A ins 2020 No. 24 s 63

s 25B ins 2020 No. 24 s 63

ch 2 pt 3 hdg sub 2020 No. 24 s 63

ch 2 pt 3 div 1 hdg sub 2020 No. 24 s 63

s 30 amd 2018 No. 17 s 176N

sub 2020 No. 24 s 63

s 30A ins 2020 No. 24 s 63

ch 2 pt 3 div 2 hdg sub 2020 No. 24 s 63

s 31 amd 2018 No. 17 s 176O

sub 2020 No. 24 s 63

s 31A ins 2020 No. 24 s 63

s 31B ins 2020 No. 24 s 63

ch 2 pt 3 div 3 hdg sub 2020 No. 24 s 63

s 32 amd 2018 No. 17 s 176P

sub 2020 No. 24 s 63

amd 2022 No. 11 s 25

ch 2 pt 3 div 4 hdg sub 2020 No. 24 s 63

ch 2 pt 3 div 4 sdiv 1 hdg ins 2020 No. 24 s 63

s 33 amd 2018 No. 17 s 176Q

sub 2020 No. 24 s 63

s 33A ins 2020 No. 24 s 63

ch 2 pt 3 div 4 sdiv 2 hdg ins 2020 No. 24 s 63

s 34 amd 2018 No. 17 s 176R

sub 2020 No. 24 s 63

s 34A ins 2018 No. 17 s 176S

sub 2020 No. 24 s 63

s 34B ins 2018 No. 17 s 176T

sub 2020 No. 24 s 63

s 34C s 34C ins 2020 No. 24 s 63

ch 2 pt 3 div 4 sdiv 3 hdg ins 2020 No. 24 s 63

s 35 amd 2018 No. 17 s 176U

sub 2020 No. 24 s 63

s 35A ins 2020 No. 24 s 63

ch 2 pt 3 div 4 sdiv 4 hdg ins 2020 No. 24 s 63

s 36 amd 2018 No. 17 s 176V

sub 2020 No. 24 s 63

s 36A ins 2018 No. 17 s 176W

sub 2020 No. 24 s 63

s 36B ins 2018 No. 17 s 176W

om 2020 No. 24 s 63

s 36C ins 2018 No. 17 s 176W

om 2020 No. 24 s 63

ch 2 pt 3 div 4 sdiv 5 hdg ins 2020 No. 24 s 63

s 37 amd 2018 No. 17 s 176X

sub 2020 No. 24 s 63

s 37A ins 2020 No. 24 s 63

s 38 om 2020 No. 24 s 63

s 39 amd 2018 No. 17 s 176Y

om 2020 No. 24 s 63

ch 2 pt 3 div 5 hdg sub 2020 No. 24 s 63

s 40 sub 2020 No. 24 s 63

s 40A ins 2020 No. 24 s 63

s 40B ins 2020 No. 24 s 63

ch 2 pt 3 div 6 hdg sub 2020 No. 24 s 63

s 41 sub 2020 No. 24 s 63

amd 2022 No. 11 s 26

s 42 om 2020 No. 24 s 63

s 43 om 2020 No. 24 s 63

ch 2 pt 3 div 7 hdg sub 2020 No. 24 s 63

s 43A ins 2020 No. 24 s 63

ch 2 pt 3 div 8 hdg om 2020 No. 24 s 63

s 44 om 2020 No. 24 s 63

s 45 om 2020 No. 24 s 63

s 46 om 2020 No. 24 s 63

s 47 om 2020 No. 24 s 63

s 48 om 2020 No. 24 s 63

s 49 om 2020 No. 24 s 63

ch 2 pt 4 hdg sub 2020 No. 24 s 63

ch 2 pt 4 div 1 hdg ins 2020 No. 24 s 63

s 50 def chapter 2 requirement ins 2022 No. 11 s 27

s 50 amd 2018 No. 17 s 176Z

sub 2020 No. 24 s 63

ch 2 pt 4 div 2 hdg ins 2020 No. 24 s 63

s 51 sub 2020 No. 24 s 63

s 51A ins 2020 No. 24 s 63

s 51B ins 2020 No. 24 s 63

s 51C ins 2020 No. 24 s 63

s 51D ins 2020 No. 24 s 63

s 51E ins 2020 No. 24 s 63

s 51F ins 2020 No. 24 s 63

s 51G ins 2020 No. 24 s 63

ch 2 pt 4 div 3 hdg ins 2020 No. 24 s 63

s 52 amd 2018 No. 17 s 176ZA

sub 2020 No. 24 s 63

s 52A ins 2020 No. 24 s 63

ch 2 pt 4 div 4 hdg ins 2020 No. 24 s 63

ch 2 pt 4 div 4 sdiv 1 hdg ins 2020 No. 24 s 63

s 53 sub 2020 No. 24 s 63

s 53A ins 2020 No. 24 s 63

s 53B ins 2020 No. 24 s 63

amd 2023 No. 23 s 247 sch 1 s 2(3)

s 53C ins 2020 No. 24 s 63

ch 2 pt 4 div 4 sdiv 2 hdg ins 2020 No. 24 s 63

s 53D ins 2020 No. 24 s 63

s 53E ins 2020 No. 24 s 63

s 53F ins 2020 No. 24 s 63

ch 2 pt 4 div 4 sdiv 3 hdg ins 2020 No. 24 s 63

s 53G ins 2020 No. 24 s 63

ch 2 pt 4 div 5 hdg ins 2020 No. 24 s 63

s 54 amd 2018 No. 17 s 176ZD

sub 2020 No. 24 s 63

s 54A ins 2018 No. 17 s 176ZF

sub 2020 No. 24 s 63

amd 2022 No. 11 s 28

s 54B ins 2020 No. 24 s 63

s 54C ins 2020 No. 24 s 63

s 54D ins 2020 No. 24 s 63

s 54E ins 2020 No. 24 s 63

s 54F ins 2020 No. 24 s 63

ch 2 pt 4 div 6 hdg ins 2020 No. 24 s 63

s 55 amd 2018 No. 17 s 176ZG

sub 2020 No. 24 s 63

s 55A ins 2018 No. 17 s 176ZH

sub 2020 No. 24 s 63

s 55B ins 2020 No. 24 s 63

s 55C ins 2020 No. 24 s 63

ch 2 pt 4 div 7 hdg ins 2020 No. 24 s 63

s 56 amd 2018 No. 17 s 176ZI

sub 2020 No. 24 s 63

s 56A ins 2020 No. 24 s 63

s 56B ins 2020 No. 24 s 63

ch 2 pt 4 div 8 hdg ins 2020 No. 24 s 63

s 57 amd 2018 No. 17 s 176ZJ

sub 2020 No. 24 s 63

amd 2022 No. 11 s 29

s 57A ins 2020 No. 24 s 63

amd 2022 No. 11 s 30

s 57B ins 2020 No. 24 s 63

s 57C ins 2020 No. 24 s 63

sub 2022 No. 11 s 31

ch 2 pt 4 div 9 hdg ins 2020 No. 24 s 63

s 58 sub 2020 No. 24 s 63

s 58A ins 2020 No. 24 s 63

s 58B ins 2020 No. 24 s 63

s 59 om 2020 No. 24 s 63

s 60 om 2020 No. 24 s 63

ch 2 pt 5 hdg om 2020 No. 24 s 63

ch 2 pt 5 div 1 hdg ins 2018 No. 17 s 176ZB

om 2020 No. 24 s 63

ch 2 pt 5 div 2 hdg ins 2018 No. 17 s 176ZC

om 2020 No. 24 s 63

ch 2 pt 5 div 3 hdg ins 2018 No. 17 s 176ZE

om 2020 No. 24 s 63

ch 2 pt 6 hdg om 2020 No. 24 s 63

s 64 def complex payment claim amd 2020 No. 24 s 64

s 75 amd 2020 No. 24 s 65

s 76 sub 2018 No. 17 s 176ZK

amd 2020 No. 24 s 66

s 85 amd 2020 No. 24 s 67

s 86 amd 2020 No. 24 s 68

s 88 amd 2018 No. 17 s 176ZL; 2020 No. 24 s 69

s 90 sub 2020 No. 24 s 70

s 95 amd 2020 No. 24 s 71

s 97 amd 2020 No. 24 s 72

ch 3 pt 4A hdg ins 2020 No. 24 s 73

s 97A ins 2020 No. 24 s 73

s 97B ins 2020 No. 24 s 73

s 97C ins 2020 No. 24 s 73

s 97D ins 2020 No. 24 s 73

s 97E ins 2020 No. 24 s 73

s 97F ins 2020 No. 24 s 73

s 97G ins 2020 No. 24 s 73

s 97H ins 2020 No. 24 s 73

s 99 amd 2020 No. 24 s 74

ch 3 pt 6A hdg ins 2020 No. 24 s 75

s 100A ins 2020 No. 24 s 75

s 100B ins 2020 No. 24 s 75

s 100C ins 2020 No. 24 s 75

s 100D ins 2020 No. 24 s 75

s 100E ins 2020 No. 24 s 75

s 100F ins 2020 No. 24 s 75

s 100G ins 2020 No. 24 s 75

s 100H ins 2020 No. 24 s 75

s 114 amd 2018 No. 17 s 197 sch 2

s 115 amd 2018 No. 17 s 197 sch 2

s 117 amd 2018 No. 17 s 197 sch 2; 2020 No. 24 s 76

s 135 amd 2018 No. 17 s 197 sch 2

s 136 amd 2018 No. 17 s 197 sch 2

s 149 amd 2020 No. 24 s 77

s 150 amd 2022 No. 34 s 365 sch 3

s 151 amd 2023 No. 23 s 247 sch 1 s 2(3)

s 158 def spent conviction om 2023 No. 23 s 247 sch 1 s 4

s 161 amd 2023 No. 23 s 247 sch 1 s 2(3)

s 165 amd 2018 No. 17 s 176ZM

s 185 amd 2018 No. 17 s 176ZN

ch 5 pt 3 hdg ins 2020 No. 24 s 78

s 189 ins 2020 No. 24 s 78

s 189A ins 2020 No. 24 s 78

s 189B ins 2020 No. 24 s 78

s 190 sub 2018 No. 17 s 176ZO

s 198A ins 2020 No. 24 s 79

s 200C ins 2020 No. 24 s 80

s 200D ins 2020 No. 24 s 80

s 200E ins 2020 No. 24 s 80

s 201 amd 2020 No. 24 s 81

ch 8 pt 1A hdg ins 2018 No. 17 s 176ZP

s 201A ins 2018 No. 17 s 176ZP

s 201B ins 2018 No. 17 s 176ZP

s 201C ins 2018 No. 17 s 176ZP

s 205A ins 2018 No. 17 s 176ZQ

s 207 def subcontractors’ charge om 2018 No. 17 s 197 sch 2

s 207 def subcontractor’s charge ins 2018 No. 17 s 197 sch 2

s 208 amd 2018 No. 17 s 197 sch 2

s 209 amd 2018 No. 17 ss 176ZR, 197 sch 2

s 211 amd 2018 No. 17 s 176ZS

exp 17 December 2019 (see s 211(4A))

ch 8A hdg ins 2020 No. 24 s 82

s 211A ins 2020 No. 24 s 82

s 211B ins 2020 No. 24 s 82

s 211C ins 2020 No. 24 s 82

s 211D ins 2020 No. 24 s 82

s 211E ins 2020 No. 24 s 82

ch 8B hdg ins 2022 No. 11 s 32

s 212 ins 2022 No. 11 s 32

s 213 ins 2022 No. 11 s 32

s 214 ins 2022 No. 11 s 32

ch 9 pt 1 div 3 hdg sub 2020 No. 24 s 83

s 216 sub 2020 No. 24 s 83

ch 9 pt 1 div 4 hdg ins 2020 No. 24 s 83

s 217 sub 2020 No. 24 s 83

s 218 sub 2020 No. 24 s 83

s 219 om 2020 No. 24 s 83

s 220 om 2020 No. 24 s 83

s 221 om 2020 No. 24 s 83

s 222 om 2020 No. 24 s 83

s 223 om 2020 No. 24 s 83

s 224 om 2020 No. 24 s 83

s 225 om 2020 No. 24 s 83

s 226 om 2020 No. 24 s 83

s 227 om 2020 No. 24 s 83

s 228 om 2020 No. 24 s 83

s 229 om 2020 No. 24 s 83

s 230 om 2020 No. 24 s 83

s 231 om 2020 No. 24 s 83

sch 2 def account review report ins 2020 No. 24 s 84 (2)

sch 2 def administrator om 2020 No. 24 s 84 (1)

sch 2 def appeal ins 2018 No. 17 s 176ZU (2)

om 2020 No. 24 s 84 (1)

sch 2 def approved financial institution ins 2020 No. 24 s 84 (2)

sch 2 def approved way ins 2020 No. 24 s 84 (2)

sch 2 def building contract sub 2020 No. 24 s 84 (1)–(2)

sch 2 def building work om 2020 No. 24 s 84 (1)

sch 2 def chapter 2 requirement ins 2022 No. 11 s 33

sch 2 def construction work sub 2020 No. 24 s 84(1)–(2)

sch 2 def contract administration ins 2020 No. 24 s 84 (2)

sch 2 def contracted building work om 2020 No. 24 s 84 (1)

sch 2 def contracted party ins 2020 No. 24 s 84 (2)

sch 2 def contracted work ins 2020 No. 24 s 84 (2)

sch 2 def contracting party ins 2020 No. 24 s 84 (2)

sch 2 def controller om 2020 No. 24 s 84 (1)

sch 2 def disputed funds account om 2018 No. 17 s 176ZU (1)

sch 2 def disputed funds trust account ins 2018 No. 17 s 176ZU (2)

om 2020 No. 24 s 84 (1)

sch 2 def dispute resolution process ins 2018 No. 17 s 176ZU (2)

om 2020 No. 24 s 84 (1)

sch 2 def financial institution ins 2020 No. 24 s 84 (2)

sch 2 def fire protection work om 2020 No. 24 s 84 (1)

sch 2 def general trust account om 2020 No. 24 s 84 (1)

sch 2 def head contract ins 2020 No. 24 s 84 (2)

sch 2 def head contractor, 1st mention, om 2020 No. 24 s 84 (1)

sch 2 def head contractor ins 2020 No. 24 s 84 (2)

sch 2 def hospital and health service ins 2020 No. 24 s 84 (2)

sch 2 def insolvency official om 2020 No. 24 s 84 (1)

sch 2 def liquidator om 2020 No. 24 s 84 (1)

sch 2 def maintenance work om 2020 No. 24 s 84 (1)

sch 2 def mechanical services work ins 2020 No. 24 s 84 (2)

sch 2 def minimum contract price ins 2020 No. 24 s 84 (2)

sch 2 def payment dispute om 2020 No. 24 s 84 (1)

sch 2 def payment withholding request ins 2020 No. 24 s 84 (2)

sch 2 def principal om 2020 No. 24 s 84 (1)

sch 2 def project bank account om 2020 No. 24 s 84 (1)

sch 2 def project trust ins 2020 No. 24 s 84 (2)

sch 2 def project trust account ins 2020 No. 24 s 84 (2)

sch 2 def project trust work ins 2020 No. 24 s 84 (2)

sch 2 def protected work ins 2020 No. 24 s 84 (2)

sch 2 def provisional liquidator om 2020 No. 24 s 84 (1)

sch 2 def registered company auditor ins 2020 No. 24 s 84 (2)

sch 2 def registrar of titles ins 2020 No. 24 s 84 (2)

sch 2 def related entity sub 2020 No. 24 s 84 (1)–(2)

sch 2 def retention account om 2018 No. 17 s 176ZU (1)

sch 2 def retention trust ins 2020 No. 24 s 84 (2)

sch 2 def retention trust account ins 2018 No. 17 s 176ZU (2)

sub 2020 No. 24 s 84 (1)–(2)

sch 2 def special investigator ins 2020 No. 24 s 84 (2)

sch 2 def spent conviction om 2023 No. 23 s 247 sch 1 s 4

sch 2 def supplier om 2020 No. 24 s 84 (1)

sch 2 def trust account ins 2020 No. 24 s 84 (2)

sch 2 def trustee in bankruptcy om 2020 No. 24 s 84 (1)

sch 2 def trust records ins 2020 No. 24 s 84 (2)

Building Industry Fairness (Security of Payment) Bill 2017