Minister: Minister for Regional Development and Manufacturing and Minister for Water
Agency: Department of Regional Development, Manufacturing and Water


Water Supply (Safety and Reliability) Act 2008 No. 34

Effective Date Publication Date Amendments Included Notes
21 May 2008

certain provs commenced

01 July 2008

certain provs commenced

01 August 2008

ss 677–679 commenced

23 February 2009 2009 Act No. 3
22 May 2009

ch 2 pt 4 div 7, ch 9 pt 3 commenced

01 July 2009 2009 Act No. 9
02 July 2009

prov exp 1 July 2009

03 November 2009 2009 Act No. 46
01 December 2009 2009 Act No. 24
18 December 2009 2009 Act No. 36
23 May 2010 2010 Act No. 20
01 July 2010 2009 Act No. 17
01 December 2010 2010 Act No. 53
01 January 2011 2010 Act No. 53
04 April 2011 2011 Act No. 6
08 April 2011 2011 Act No. 8
28 October 2011 2011 Act No. 312011 Act No. 33
30 June 2012 2012 Act No. 1
08 November 2012 2012 Act No. 29
22 November 2012 2012 Act No. 34
11 December 2012 2012 Act No. 43
01 January 2013 2012 Act No. 39
31 March 2013 2012 Act No. 16
14 May 2013 2013 Act No. 23
23 September 2013 2013 Act No. 39
01 November 2013 2013 Act No. 302013 Act No. 51
13 May 2014 2014 Act No. 16
21 May 2014 2014 Act No. 17
01 July 2014 2014 Act No. 162014 Act No. 31

RA ss 44, 44A

26 September 2014 2014 Act No. 51
21 August 2015 15 September 2016 2015 Act No. 4

RA ss 26(1), 27, 28, 35, 44

01 July 2016 14 October 2016 2014 Act No. 7
06 December 2016 07 December 2016 2014 Act No. 64

RA s 44

01 March 2017 23 March 2017 2016 Act No. 63
01 July 2017 14 July 2017 2017 Act No. 11

RA s 35

03 July 2017 12 January 2018 2016 Act No. 27

RA s 35

24 May 2019 11 June 2019 2019 Act No. 17
01 July 2019 13 February 2020 2018 Act No. 17
13 February 2020 14 February 2020 2020 Act No. 3
25 May 2020 29 May 2020 2020 Act No. 14
20 October 2021 20 October 2021 2021 Act No. 18
08 March 2022 09 March 2022 2022 Act No. 1
20 September 2023 25 September 2023 2023 Act No. 24
01 January 2024 21 December 2023

provs exp 31 December 2023

03 June 2024 04 June 2024 2024 Act No. 18
01 July 2024 30 June 2024 2024 Act No. 22

Water Supply (Safety and Reliability) Act 2008 No. 34

date of assent 21 May 2008

ss 1–2 commenced on date of assent

ss 677–679 commenced 1 August 2008 (see s 2 (1))

ch 10 pt 3 (other than s 663), ss 666, 674–676, 680–682, 684–692, 695–696, 715–721, 735(1)–(3), 736, 738 (to the extent it ins pt 3A), 739, 743–744, 745 (to the extent it ins div 11 hdg and ss 1166–1167), 747(3), ch 11, sch 2 amdt of the Water Resource (Fitzroy Basin) Plan 1999 commenced on date of assent (see s 2 (2))

ch 2 pt 4 div 7, ch 9 pt 3 commenced 22 May 2009 (automatic commencement under AIA s 15DA (2))

remaining provisions commenced 1 July 2008 (2008 SL No. 202)

Greenhouse Gas Storage Act 2009 No. 3 s 1, ch 9 pt 27

date of assent 23 February 2009

commenced on date of assent

Financial Accountability Act 2009 No. 9 ss 1, 2(2), 136 sch 1

date of assent 28 May 2009

ss 1–2 commenced on date of assent

remaining provisions commenced 1 July 2009 (2009 SL No. 80)

Local Government Act 2009 No. 17 ss 1, 2(4), 331 sch 1

date of assent 12 June 2009

ss 1–2 commenced on date of assent

remaining provisions commenced 1 July 2010 (2010 SL No. 122)

Queensland Civil and Administrative Tribunal (Jurisdiction Provisions) Amendment Act 2009 No. 24 ss 1–2, ch 6 pt 12

date of assent 26 June 2009

ss 1–2 commenced on date of assent

remaining provisions commenced 1 December 2009 (2009 SL No. 252)

Sustainable Planning Act 2009 No. 36 ss 1–2, 872 sch 2

date of assent 22 September 2009

ss 1–2 commenced on date of assent

remaining provisions commenced 18 December 2009 (2009 SL No. 281)

South-East Queensland Water (Distribution and Retail Restructuring) and Natural Resources Provisions Act 2009 No. 46 s 1, ch 7 pt 8

date of assent 03 November 2009

commenced on date of assent

South-East Queensland Water (Distribution and Retail Restructuring) and Other Legislation Amendment Act 2010 No. 20 s 1, pt 12

date of assent 23 May 2010

commenced on date of assent

Water and Other Legislation Amendment Act 2010 No. 53 ss 1–2(1), pt 15

date of assent 01 December 2010

ss 1–2 commenced on date of assent

s 209 commenced 1 January 2011 when the customer water and wastewater code first made under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009, s 93 takes effect (see s 2 (1) and gazette notice pubd Queensland Government Gazette No. 120, 24 December 2010 p 1183)

remaining provisions commenced on date of assent

Environmental Protection and Other Legislation Amendment Act 2011 No. 6 s 1, pt 10

date of assent 04 April 2011

commenced on date of assent

Revenue and Other Legislation Amendment Act 2011 No. 8 s 1, pt 15

date of assent 08 April 2011

commenced on date of assent

Disaster Readiness Amendment Act 2011 No. 33 pts 1, 8

date of assent 28 October 2011

commenced on date of assent

Waste Reduction and Recycling Act 2011 No. 31 s 1, ch 16 pt 10

date of assent 28 October 2011

commenced on date of assent

South-East Queensland Water (Distribution and Retail Restructuring) and Other Legislation Amendment Act 2012 No. 1 ss 1–2(1), pt 8

date of assent 17 February 2012

ss 1–2 commenced on date of assent

remaining provisions commenced at the end of 30 June 2012 (see s 2 (1))

Environmental Protection (Greentape Reduction) and Other Legislation Amendment Act 2012 No. 16 pt 1, s 78 sch

date of assent 14 August 2012

ss 1–2 commenced on date of assent

remaining provisions commenced 31 March 2013 (2013 SL No. 24)

Water Legislation (Dam Safety and Water Supply Enhancement) and Other Legislation Amendment Act 2012 No. 29 s 1, pt 4

date of assent 08 November 2012

commenced on date of assent

Sustainable Planning and Other Legislation Amendment Act (No. 2) 2012 No. 34 s 1, pt 10

date of assent 22 November 2012

commenced on date of assent

South East Queensland Water (Restructuring) and Other Legislation Amendment Act 2012 No. 39 pts 1, 6

date of assent 05 December 2012

ss 1–2 commenced on date of assent

remaining provisions commenced 1 January 2013 (2012 SL No. 239)

Economic Development Act 2012 No. 43 ss 1, 2(c), ch 8 pt 7

date of assent 11 December 2012

commenced on date of assent

Land, Water and Other Legislation Amendment Act 2013 No. 23 s 1, pt 20, s 352 sch 1 pt 1

date of assent 14 May 2013

commenced on date of assent

Building and Other Legislation Amendment Act 2013 No. 30 pts 1, 4

date of assent 13 August 2013

ss 1–2 commenced on date of assent

remaining provisions commenced 1 November 2013 (2013 SL No. 216)

Treasury and Trade and Other Legislation Amendment Act 2013 No. 39 ss 1, 109 sch 2

date of assent 23 September 2013

commenced on date of assent

Directors’ Liability Reform Amendment Act 2013 No. 51 ss 1–2(1), pt 80, s 229 sch 1

date of assent 29 October 2013

ss 1–2 commenced on date of assent

remaining provisions commenced 1 November 2013 (see s 2 (1))

Biosecurity Act 2014 No. 7 ss 1–2, 578, sch 4 pt 2

date of assent 13 March 2014

ss 1–2 commenced on date of assent

remaining provisions commenced 1 July 2016 (see s 2 (1)–(2))

Note—AIA s 15DA does not apply to this Act (see s 2 (3))

Water Supply Services Legislation Amendment Act 2014 No. 16 chs 1, 2 pt 4, 3 pt 3, s 101 sch 1

date of assent 13 May 2014

ss 1–2, ch 3 pt 3, sch 1 amdts 1–20, 23 commenced on date of assent (see s 2 (2))

remaining provisions commenced 1 July 2014 (2014 SL No. 79)

Public Safety Business Agency Act 2014 No. 17 ss 1, 184 sch 1 pt 4

date of assent 21 May 2014

commenced on date of assent

Electricity and Other Legislation Amendment Act 2014 No. 31 pts 1, 4

date of assent 28 May 2014

ss 1–2 commenced on date of assent

remaining provisions commenced 1 July 2014 (2014 SL No. 93)

Water Legislation (Miscellaneous Provisions) Amendment Act 2014 No. 51 pts 1, 4

date of assent 26 September 2014

commenced on date of assent

Water Reform and Other Legislation Amendment Act 2014 No. 64

date of assent 05 December 2014

ss 1–2 commenced on date of assent

ss 5859, 64 (to the extent it ins new s 5AA(1)(b) and (4)), 64–137, 139, 171, 173, 175, 179, 185–186, 187(4), 188, 192, 193 (other than to the extent it om s 1014(2)(h)), 194, 201 (to the extent it ins ss 12501279, 1280A, 1281), 202(1) (to the extent it om defs cumulative management area, deferred aspect, domestic purposes, ecological outcome, environmental flow objective, environmental management rules, final report, full supply level, incoming owner, interim resource operations licence, interim water allocation, nominator, nominee, operator, process, relevant company, relevant dam, resource operations plan, seasonal water assignment notice, special agreement Act, sustainable management, underground water, underground water impact report, underground water rights, volumetric limit, water allocation, water allocation change rules, water allocation group, water allocation security objective, water monitoring authority, water resource plan, water sharing rules, water supply scheme and water year), (2) (to the extent it ins defs acknowledgement notice, affected person, Alcan agreement Act, aquifer, closing CMA tenure, CMA tenure, Comalco agreement Act, coordinated project, cumulative management area, dealing, designated watercourse, domestic purposes, element of a water allocation, environmental flow objective, environmental management rules, environmental outcome, final report, full supply level, incoming owner, interference, maximum rate, Mineral Resources Act, mining tenure, mining tenure holder, nominator, nominee, operations manual, Petroleum and Gas Act, plan area, process, relevant company, resource tenure, resource tenure holder, riverine protection permit, seasonal water assignment notice, special agreement Act, specified conditions (para (b)), statutory authorisation to take or interfere with water, underground water, underground water impact report, underground water rights, volumetric limit, water allocation, water allocation dealing, water allocation dealing rules, water allocation group, water allocation security objective, water entitlement notice, water management protocol, water monitoring authority, water plan, water planning instrument, water plan outcomes, water sharing rules, water supply scheme, water use plan, water year), (3)–(7), (9)–(21), s 254 sch 1, s 255 sch 2 comm 6 December 2016 (automatic commencement under AIA s 15DA(2)

Payroll Tax Rebate, Revenue and Other Legislation Amendment Act 2015 No. 4 ss 1, 2(2), pt 10

date of assent 11 June 2015

ss 1–2 commenced on date of assent

remaining provisions commenced 21 August 2015 (2015 SL No. 100)

Planning (Consequential) and Other Legislation Amendment Act 2016 No. 27

date of assent 25 May 2016

ss 1–2 comm on date of assent

pts 2–69 comm 3 July 2017 (automatic commencement under AIA s 15DA(2))

Note—The Planning Act 2016 was renumbered in the first reprint—see 2016 Act No. 26 s 320A. Cross-references to the Planning Act 2016 have been updated to reflect the renumbering.

Industrial Relations Act 2016 No. 63

date of assent 09 December 2016

ch 1 pt 1 hdgs, ss 35, pts 2–3, chs 2–18, ch 19 pts 1–7, ss 11181124, 1126–1128, 1151, 1152 (to the extent it ins new s 289), ch 19 pts 9–10, schs 1–6 comm 1 March 2017 (2017 SL No. 24)

Water Legislation (Dam Safety) Amendment Act 2017 No. 11

date of assent 19 May 2017

pts 2–3 comm 1 July 2017 (see s 2)

Plumbing and Drainage Act 2018 No. 17

date of assent 11 September 2018

pt 1 div 1 (other than ss 12), div 2, pts 27, pt 8 div 1, ss 159173, 174, pt 9 div 1, s 176F (2), pt 9 div 2, div 4, sch 1, sch 2 (other than amdts of Building Industry Fairness (Security of Payment) Act 2017) comm 1 July 2019 (2019 SL No. 41)

Natural Resources and Other Legislation Amendment Act 2019 No. 17

date of assent 24 May 2019

chs 1–2, 4, 6–7, sch 1 comm on date of assent

Agriculture and Other Legislation Amendment Act 2020 No. 3

date of assent 13 February 2020

pt 19A comm on date of assent

Mineral and Energy Resources and Other Legislation Amendment Act 2020 No. 14

date of assent 25 May 2020

pt 18 comm on date of assent (see s 2(f))

Resources and Other Legislation Amendment Act 2021 No. 18

date of assent 20 October 2021

pt 6 comm on date of assent

Health and Other Legislation Amendment Act 2022 No. 1

date of assent 08 March 2022

s 117 sch 1 pt 1 comm on date of assent

Water Legislation Amendment Act 2023 No. 24

date of assent 20 September 2023

pt 4, s 72 sch 1 pt 1 comm on date of assent

Emergency Services Reform Amendment Act 2024 No. 18

date of assent 03 May 2024

s 39 sch 1 comm 3 June 2024 (2024 SL No. 57)

Disaster Management and Other Legislation Amendment Act 2024 No. 22

date of assent 09 May 2024

s 92 sch 1 comm 1 July 2024 (2024 SL No. 69)

This is a consolidated list of all history notes in this reprint. Show or hide the list by using the Turn history notes on/off button at the top of the page. The complete list can be printed (Ctrl-P) from the screen when the history notes are turned on.

s 12 amd 2013 No. 23 s 308; 2014 No. 16 s 50; 2023 No. 24 s 75 sch 1 pt 1

s 12A ins 2014 No. 16 s 51

amd 2023 No. 24 s 75 sch 1 pt 1

s 13 amd 2009 No. 46 s 134; 2012 No. 39 s 88; 2013 No. 23 s 309; 2014 No. 16 s 52

s 14 sub 2009 No. 46 s 135

amd 2023 No. 24 s 56

ch 2 pt 3 div 1 hdg ins 2013 No. 23 s 352 sch 1 pt 1

s 20 amd 2009 No. 46 s 136; 2010 No. 53 s 208; 2013 No. 23 s 310; 2014 No. 31 s 21

s 21 sub 2013 No. 23 s 311

s 22 sub 2013 No. 23 s 311

ch 2 pt 3 div 1 hdg ins 2013 No. 23 s 311

s 23 amd 2013 No. 23 s 312

s 23A (prev s 30) amd 2013 No. 23 s 318 (1)

renum and reloc 2013 No. 23 s 318 (2)

amd 2023 No. 24 s 57

ch 2 pt 3 div 1 hdg ins 2013 No. 23 s 313

s 24 sub 2013 No. 23 s 313

s 25 sub 2013 No. 23 s 313

s 25A ins 2013 No. 23 s 313

s 25B ins 2013 No. 23 s 313

s 25C ins 2013 No. 23 s 313

ch 2 pt 3 div 1 hdg ins 2013 No. 23 s 313

s 26 amd 2013 No. 23 s 314

s 27 sub 2013 No. 23 s 315

s 28 amd 2013 No. 23 s 316

ch 2 pt 3 div 1 hdg ins 2013 No. 23 s 317

s 30 ins 2013 No. 23 s 319

s 30A ins 2013 No. 23 s 319

amd 2019 No. 17 s 341

s 31 def place amd 2013 No. 23 s 320

s 35 amd 2014 No. 16 s 53; 2015 No. 4 s 85; 2018 No. 17 s 197 sch 2

s 36 amd 2014 No. 16 s 54; 2015 No. 4 s 86; 2017 No. 11 s 6

s 38 amd 2013 No. 23 s 352 sch 1 pt 1

s 41 amd 2010 No. 20 s 120; 2012 No. 39 s 89; 2014 No. 16 s 101 sch 1; 2020 No. 14 s 215

s 42 amd 2012 No. 39 s 90

s 43 amd 2014 No. 51 s 38

s 45 amd 2014 No. 16 s 55

s 49 amd 2013 No. 23 s 321

s 51 amd 2012 No. 39 s 91

s 52 amd 2012 No. 39 s 92

s 54 amd 2010 No. 20 s 121

ch 2 pt 4 div 1 hdg prev div 1 hdg om 2014 No. 16 s 56

pres div 1 hdg (prev div 3 hdg) renum 2014 No. 16 s 101 sch 1

s 70 amd 2012 No. 29 s 21

om 2014 No. 16 s 56

s 71 amd 2013 No. 23 s 322

om 2014 No. 16 s 56

s 72 om 2014 No. 16 s 56

s 73 om 2014 No. 16 s 56

s 74 amd 2013 No. 23 s 323

om 2014 No. 16 s 56

s 75 amd 2013 No. 23 s 324

om 2014 No. 16 s 56

s 76 amd 2013 No. 23 s 325

om 2014 No. 16 s 56

s 77 om 2014 No. 16 s 56

s 78 sub 2012 No. 29 s 22

om 2014 No. 16 s 56

s 79 om 2014 No. 16 s 56

s 80 amd 2013 No. 23 s 326

om 2014 No. 16 s 56

s 81 om 2014 No. 16 s 56

s 82 om 2014 No. 16 s 56

s 83 om 2014 No. 16 s 56

s 84 om 2014 No. 16 s 56

s 85 om 2014 No. 16 s 56

s 86 om 2014 No. 16 s 56

s 87 amd 2013 No. 23 s 327

om 2014 No. 16 s 56

s 88 amd 2013 No. 23 s 328

om 2014 No. 16 s 56

s 89 sub 2013 No. 23 s 329

om 2014 No. 16 s 56

s 90 amd 2013 No. 23 s 330

om 2014 No. 16 s 56

s 91 om 2014 No. 16 s 56

s 92 amd 2013 No. 51 s 229 sch 1

s 93 amd 2013 No. 51 s 229 sch 1

s 95 amd 2010 No. 20 s 122; 2013 No. 23 s 331

s 96 amd 2013 No. 23 s 332

s 99 amd 2014 No. 16 s 101 sch 1; 2023 No. 24 s 58

s 99A ins 2014 No. 16 s 57

s 100 amd 2013 No. 23 s 333; 2014 No. 16 s 58

s 101 amd 2013 No. 23 s 334

ch 2 pt 4 div 1 hdg sub 2010 No. 20 s 123

s 102AA ins 2010 No. 20 s 124

s 102 sub 2010 No. 20 s 124

amd 2013 No. 51 s 229 sch 1

s 102A ins 2010 No. 20 s 124

s 102B ins 2010 No. 20 s 124

ch 2 pt 4 div 1 hdg ins 2010 No. 20 s 124

ch 2 pt 4 div 2 hdg prev div 2 hdg om 2014 No. 16 s 56

pres div 2 hdg (prev div 4 hdg) renum 2014 No. 16 s 101 sch 1

s 105 prev s 105 om 2014 No. 16 s 59

pres s 105 ins 2023 No. 24 s 59

s 106 amd 2014 No. 16 s 60

s 107 amd 2013 No. 23 s 335; 2014 No. 16 s 61

s 108 sub 2014 No. 16 s 62; 2023 No. 24 s 60

s 108A ins 2014 No. 16 s 62

sub 2023 No. 24 s 60

s 109 amd 2014 No. 16 s 63; 2023 No. 24 s 61

s 110 amd 2014 No. 16 s 64; 2023 No. 24 s 62

s 112 amd 2013 No. 23 s 336; 2014 No. 16 s 101 sch 1

ch 2 pt 4 div 2 hdg om 2014 No. 16 s 56

ch 2 pt 4 div 2 hdg om 2014 No. 16 s 56

ch 2 pt 4 div 2 hdg om 2014 No. 16 s 56

ch 2 pt 4 div 2 hdg om 2014 No. 16 s 56

ch 2 pt 4 div 2 hdg om 2014 No. 16 s 56

ch 2 pt 4 div 3 hdg (prev div 5 hdg) renum 2014 No. 16 s 101 sch 1

s 113 amd 2014 No. 16 s 101 sch 1

s 114 amd 2010 No. 53 s 209; 2012 No. 1 s 101; 2014 No. 16 s 65

s 115 amd 2013 No. 23 s 337

sub 2014 No. 16 s 66

s 116 sub 2014 No. 16 s 66

s 119 amd 2013 No. 23 s 338; 2014 No. 16 s 67

s 120 amd 2013 No. 23 s 339; 2014 No. 16 s 68; 2023 No. 24 s 63

s 121 om 2014 No. 16 s 69

s 122 amd 2012 No. 29 s 23

om 2014 No. 16 s 69

s 123 amd 2010 No. 20 s 125; 2012 No. 29 s 24; 2013 No. 23 s 340

om 2014 No. 16 s 69

s 124 om 2014 No. 16 s 69

s 125 sub 2010 No. 20 s 126

om 2014 No. 16 s 69

s 126 om 2014 No. 16 s 69

s 127 om 2014 No. 16 s 69

s 128 om 2014 No. 16 s 69

s 129 amd 2013 No. 23 s 341

om 2014 No. 16 s 69

s 130 om 2014 No. 16 s 69

s 131 om 2010 No. 20 s 127

s 132 amd 2012 No. 39 s 93

om 2014 No. 16 s 69

s 133 amd 2011 No. 8 s 117; 2012 No. 29 s 25

om 2014 No. 16 s 69

s 134 om 2014 No. 16 s 69

s 135 om 2014 No. 16 s 69

s 136 om 2014 No. 16 s 69

ch 2 pt 4 div 4 hdg (prev div 8 hdg) renum 2014 No. 16 s 101 sch 1

s 138 amd 2010 No. 20 s 128; 2009 No. 17 s 331 sch 1; 2012 No. 1 s 102; 2012 No. 39 s 94

s 139 amd 2009 No. 17 s 331 sch 1; 2012 No. 39 s 95

om 2014 No. 16 s 70

s 140 amd 2018 No. 17 s 197 sch 2

ch 2 pt 4 div 5 hdg ins 2014 No. 16 s 71

s 141 amd 2009 No. 9 s 136 sch 1; 2009 No. 17 s 331 sch 1; 2011 No. 8 s 118

sub 2014 No. 16 s 71

amd 2023 No. 24 s 75 sch 1 pt 1

s 142 amd 2010 No. 20 s 129; 2011 No. 8 s 119; 2013 No. 23 s 342

sub 2014 No. 16 s 71

amd 2023 No. 24 s 64

s 142A ins 2014 No. 16 s 71

amd 2023 No. 24 s 65

s 142B ins 2014 No. 16 s 71

s 142C ins 2014 No. 16 s 71

amd 2023 No. 24 s 75 sch 1 pt 1

s 142D ins 2014 No. 16 s 71

ch 2 pt 4 div 6 hdg prev div 6 hdg om 2014 No. 16 s 69

pres div 6 hdg (prev div 10 hdg) renum 2014 No. 16 s 101 sch 1

s 143 amd 2014 No. 16 s 101 sch 1

s 145 amd 2014 No. 17 s 184 sch 1 pt 4; 2024 No. 22 s 92 sch 1

ch 2 pt 4 div 7 hdg om 2014 No. 16 s 69

ch 2 pt 4 div 9 hdg om 2014 No. 16 s 71

ch 2 pt 4 div 11 hdg om 2014 No. 16 s 69

s 146 om 2014 No. 16 s 69

s 147 om 2014 No. 16 s 69

s 148 om 2014 No. 16 s 69

s 149 om 2014 No. 16 s 69

s 150 om 2014 No. 16 s 69

s 160 amd 2014 No. 16 s 37

sub 2019 No. 17 s 342

s 161 sub 2019 No. 17 s 343

s 162 amd 2019 No. 17 s 344; 2023 No. 24 s 66

s 163 amd 2014 No. 16 s 101 sch 1; 2023 No. 24 s 67

ch 2 pt 5 div 4 hdg amd 2014 No. 16 s 38

s 167 amd 2009 No. 36 s 872 sch 2; 2010 No. 20 s 130; 2014 No. 16 s 39; 2019 No. 17 s 345

s 168 amd 2019 No. 17 s 346

s 169 amd 2012 No. 1 s 103; 2012 No. 39 s 96

ch 2 pt 5 div 6 hdg ins 2014 No. 16 s 41

s 170 prev s 170 om 2014 No. 16 s 40

pres s 170 ins 2014 No. 16 s 41

s 171 ins 2014 No. 16 s 41

s 172 ins 2014 No. 16 s 41

s 173 ins 2014 No. 16 s 41

s 174 ins 2014 No. 16 s 41

ch 2 pt 6 hdg amd 2011 No. 31 s 397

s 180 amd 2010 No. 20 s 131

sub 2011 No. 31 s 398

amd 2014 No. 16 s 72

s 181 amd 2010 No. 20 s 132; 2011 No. 31 s 399

s 182 amd 2010 No. 20 s 133; 2011 No. 31 s 400

s 183 amd 2010 No. 20 s 134; 2011 No. 31 s 401

s 184 amd 2010 No. 20 s 135; 2011 No. 31 s 402

s 185 amd 2010 No. 20 s 136; 2011 No. 31 s 403

s 190 amd 2013 No. 23 s 343; 2013 No. 51 s 229 sch 1

s 192 amd 2013 No. 30 s 8

s 193 amd 2010 No. 20 s 137; 2011 No. 31 s 404

ch 3 pt 1A hdg ins 2014 No. 16 s 73

ch 3 pt 1A div 1 hdg ins 2014 No. 16 s 73

s 196AA ins 2014 No. 16 s 73

amd 2014 No. 31 s 22

s 196AB ins 2014 No. 16 s 73

s 196AC ins 2014 No. 16 s 73

s 196 amd 2013 No. 51 s 229 sch 1

sub 2014 No. 16 s 74

amd 2014 No. 31 s 23

s 197 amd 2013 No. 51 s 229 sch 1; 2014 No. 16 s 75

s 198 sub 2010 No. 53 s 210

amd 2013 No. 51 s 229 sch 1

om 2014 No. 31 s 24

s 199 ins 2010 No. 53 s 210

om 2014 No. 31 s 24

s 200 amd 2010 No. 53 s 211

s 201 amd 2009 No. 46 s 137; 2010 No. 20 s 138; 2010 No. 53 s 212; 2013 No. 23 s 344

sub 2014 No. 16 s 76

amd 2014 No. 31 s 25

s 201A ins 2010 No. 53 s 213

om 2014 No. 31 s 26

s 202 amd 2010 No. 53 s 214; 2014 No. 16 s 77; 2014 No. 31 s 27

s 205 amd 2010 No. 53 s 215; 2014 No. 31 s 28

s 206 amd 2010 No. 20 s 139; 2010 No. 53 s 216; 2014 No. 31 s 29

s 207 amd 2010 No. 53 s 217; 2014 No. 16 s 101 sch 1; 2014 No. 31 s 30

s 210 amd 2010 No. 53 s 218

s 211 amd 2010 No. 53 s 219

s 235 amd 2010 No. 53 s 220; 2014 No. 31 s 31

ch 3 pt 5 hdg om 2014 No. 16 s 78

s 250 amd 2010 No. 20 s 140; 2013 No. 23 s 345

om 2014 No. 16 s 78

s 251 om 2014 No. 16 s 78

s 252 om 2014 No. 16 s 78

s 253 om 2014 No. 16 s 78

s 254 om 2014 No. 16 s 78

s 255 om 2014 No. 16 s 78

s 256 om 2014 No. 16 s 78

s 257 om 2014 No. 16 s 78

s 258 sub 2023 No. 24 s 68

s 259 amd 2023 No. 24 s 69

s 260 sub 2023 No. 24 s 70

s 261 sub 2023 No. 24 s 70

s 263 amd 2009 No. 46 s 138

ch 3 pt 7 hdg amd 2010 No. 53 s 221

ch 3 pt 7 div 1 hdg ins 2010 No. 20 s 141

sub 2010 No. 53 s 222

s 270AA ins 2010 No. 20 s 141

amd 2014 No. 16 s 79

s 270 sub 2010 No. 20 s 141

amd 2013 No. 51 s 229 sch 1

s 271 sub 2010 No. 20 s 141

amd 2013 No. 51 s 229 sch 1

s 272 sub 2010 No. 20 s 141

ch 3 pt 7 div 2 hdg ins 2010 No. 20 s 141

s 273 ins 2010 No. 20 s 141

amd 2014 No. 16 s 80

ch 3 pt 7 div 3 hdg ins 2010 No. 53 s 224

s 274 prev s 274 ins 2010 No. 20 s 141

om 2010 No. 53 s 223

pres s 274 ins 2010 No. 53 s 224

amd 2013 No. 23 s 346; 2014 No. 31 s 32

s 275 ins 2010 No. 53 s 224

s 301 amd 2010 No. 20 s 142; 2010 No. 53 s 225; 2013 No. 23 s 347; 2014 No. 31 s 33; 2019 No. 17 s 347

s 302 amd 2009 No. 46 s 139

s 304 amd 2010 No. 20 s 143

s 316 amd 2010 No. 53 s 226; 2014 No. 31 s 34

ch 3 pt 9A hdg ins 2010 No. 53 s 228

om 2014 No. 31 s 35

ch 3 pt 9A div 1 hdg ins 2010 No. 53 s 228

om 2014 No. 31 s 35

s 318 orig s 318 om 2010 No. 53 s 227

prev s 318 ins 2010 No. 53 s 228

amd 2012 No. 39 s 97

om 2014 No. 31 s 35

ch 3 pt 9A div 2 hdg ins 2010 No. 53 s 228

om 2014 No. 31 s 35

s 319 ins 2010 No. 53 s 228

om 2014 No. 31 s 35

ch 3 pt 9A div 3 hdg ins 2010 No. 53 s 228

om 2014 No. 31 s 35

ch 3 pt 9A div 3 hdg ins 2010 No. 53 s 228

om 2014 No. 31 s 35

s 320 ins 2010 No. 53 s 228

om 2014 No. 31 s 35

s 321 ins 2010 No. 53 s 228

om 2014 No. 31 s 35

ch 3 pt 9A div 3 hdg ins 2010 No. 53 s 228

om 2014 No. 31 s 35

s 322 ins 2010 No. 53 s 228

om 2014 No. 31 s 35

s 323 ins 2010 No. 53 s 228

om 2014 No. 31 s 35

s 324 ins 2010 No. 53 s 228

om 2014 No. 31 s 35

s 325 ins 2010 No. 53 s 228

amd 2012 No. 16 s 78 sch

om 2014 No. 31 s 35

s 326 ins 2010 No. 53 s 228

om 2014 No. 31 s 35

s 327 ins 2010 No. 53 s 228

om 2014 No. 31 s 35

s 328 ins 2010 No. 53 s 228

om 2014 No. 31 s 35

s 329 ins 2010 No. 53 s 228

om 2014 No. 31 s 35

ch 3 pt 9A div 3 hdg ins 2010 No. 53 s 228

om 2014 No. 31 s 35

s 329A ins 2010 No. 53 s 228

om 2014 No. 31 s 35

s 329B ins 2010 No. 53 s 228

om 2014 No. 31 s 35

s 329C ins 2010 No. 53 s 228

om 2014 No. 31 s 35

ch 3 pt 9A div 4 hdg ins 2010 No. 53 s 228

om 2014 No. 31 s 35

s 329D ins 2010 No. 53 s 228

om 2014 No. 31 s 35

s 329E ins 2010 No. 53 s 228

om 2014 No. 31 s 35

s 329F ins 2010 No. 53 s 228

om 2014 No. 31 s 35

s 329G ins 2010 No. 53 s 228

om 2014 No. 31 s 35

ch 3 pt 9A div 4A hdg ins 2011 No. 31 s 395

om 2014 No. 31 s 35

s 329GA ins 2011 No. 31 s 395

om 2014 No. 31 s 35

s 329GB ins 2011 No. 31 s 395

om 2014 No. 31 s 35

s 329GC ins 2011 No. 31 s 395

om 2014 No. 31 s 35

ch 3 pt 9A div 5 hdg ins 2010 No. 53 s 228

om 2014 No. 31 s 35

s 329H ins 2010 No. 53 s 228

om 2014 No. 31 s 35

s 329I ins 2010 No. 53 s 228

om 2014 No. 31 s 35

s 329J ins 2010 No. 53 s 228

om 2014 No. 31 s 35

s 330 amd 2010 No. 20 s 144; 2011 No. 31 s 405

s 331 amd 2010 No. 20 s 145; 2011 No. 31 s 406

s 333 sub 2010 No. 20 s 146

s 334 ins 2010 No. 20 s 146

ch 4 hdg amd 2012 No. 29 s 26

s 340 sub 2010 No. 20 s 147

amd 2013 No. 23 s 352 sch 1 pt 1

s 341 amd 2010 No. 20 s 148; 2017 No. 11 s 7

ch 4 pt 1 div 1A hdg ins 2017 No. 11 s 8

s 342A ins 2017 No. 11 s 8

s 342B ins 2017 No. 11 s 8

s 343 amd 2010 No. 20 s 149; 2012 No. 29 s 27; 2013 No. 51 s 229 sch 1

s 344 amd 2010 No. 20 s 150; 2013 No. 51 s 229 sch 1; 2017 No. 11 s 9

s 345 amd 2010 No. 20 s 151; 2013 No. 51 s 229 sch 1

sub 2017 No. 11 s 10

s 346 sub 2017 No. 11 s 11

s 348 amd 2010 No. 20 s 152; 2017 No. 11 s 12

s 350 amd 2010 No. 20 s 153

s 351 amd 2013 No. 51 s 229 sch 1

s 352 amd 2013 No. 51 s 229 sch 1

ch 4 pt 1 div 2A hdg ins 2012 No. 29 s 28

ch 4 pt 1 div 2A hdg ins 2012 No. 29 s 28

s 352A def approval period amd 2017 No. 11 s 13 (4)

s 352A def chairperson amd 2017 No. 11 s 13 (5)

s 352A def dam failure hazard om 2017 No. 11 s 13 (2)

s 352A def dam hazard ins 2017 No. 11 s 13 (3)

s 352A def dam hazard event ins 2017 No. 11 s 13 (3)

s 352A def disaster management plan sub 2017 No. 11 s 13 (2)–(3)

s 352A def disaster management review report om 2017 No. 11 s 13 (2)

s 352A def disaster management review response om 2017 No. 11 s 13 (2)

s 352A def district group sub 2017 No. 11 s 13 (2)–(3)

s 352A def downstream release hazard om 2017 No. 11 s 13 (2)

s 352A def emergency condition om 2017 No. 11 s 13 (2)

s 352A def emergency event sub 2017 No. 11 s 13 (2)–(3)

s 352A def local disaster management plan om 2017 No. 11 s 13 (2)

s 352A def local group sub 2017 No. 11 s 13 (2)–(3)

s 352A def notice response ins 2017 No. 11 s 13 (3)

s 352A def relevant disaster management group om 2017 No. 11 s 13 (2)

s 352A def relevant district group om 2017 No. 11 s 13 (2)

s 352A def relevant entity ins 2017 No. 11 s 13 (3)

s 352A def relevant local group om 2017 No. 11 s 13 (2)

s 352A ins 2012 No. 29 s 28

amd 2017 No. 11 s 13

s 352B ins 2012 No. 29 s 28

om 2017 No. 11 s 14

s 352C ins 2012 No. 29 s 28

om 2017 No. 11 s 14

s 352D ins 2012 No. 29 s 28

om 2017 No. 11 s 14

ch 4 pt 1 div 2A hdg ins 2012 No. 29 s 28

s 352E ins 2012 No. 29 s 28

sub 2017 No. 11 s 15

s 352F ins 2012 No. 29 s 28

amd 2017 No. 11 s 16

ch 4 pt 1 div 2A hdg ins 2012 No. 29 s 28

s 352G ins 2012 No. 29 s 28

om 2017 No. 11 s 17

s 352H ins 2012 No. 29 s 28

sub 2017 No. 11 s 18

s 352HA ins 2017 No. 11 s 18

s 352HB ins 2017 No. 11 s 18

s 352HC ins 2017 No. 11 s 18

ch 4 pt 1 div 2A hdg ins 2012 No. 29 s 28

s 352I ins 2012 No. 29 s 28

amd 2017 No. 11 s 19

s 352J ins 2012 No. 29 s 28

amd 2017 No. 11 s 20

s 352K ins 2012 No. 29 s 28

amd 2017 No. 11 s 21; 2019 No. 17 s 348

s 352L ins 2012 No. 29 s 28

ch 4 pt 1 div 2A hdg ins 2012 No. 29 s 28

s 352M ins 2012 No. 29 s 28

amd 2023 No. 24 s 75 sch 1 pt 1

s 352N ins 2012 No. 29 s 28

amd 2017 No. 11 s 22

ch 4 pt 1 div 2A hdg ins 2012 No. 29 s 28

s 352O ins 2012 No. 29 s 28

amd 2017 No. 11 s 23

s 352P ins 2012 No. 29 s 28

amd 2023 No. 24 s 71

ch 4 pt 1 div 2A hdg ins 2012 No. 29 s 28

s 352Q ins 2012 No. 29 s 28

sub 2017 No. 11 s 24

amd 2019 No. 17 s 349

s 352R ins 2012 No. 29 s 28

ch 4 pt 1 div 2A hdg ins 2012 No. 29 s 28

s 352S ins 2012 No. 29 s 28

amd 2019 No. 17 s 350

ch 4 pt 1 div 2A hdg ins 2012 No. 29 s 28

s 352T ins 2012 No. 29 s 28

amd 2017 No. 11 s 25

s 352U ins 2012 No. 29 s 28

amd 2017 No. 11 s 25A

s 352V ins 2012 No. 29 s 28

s 354 amd 2011 No. 33 s 35; 2017 No. 11 s 26

s 355 amd 2010 No. 20 s 154

s 356A ins 2012 No. 39 s 98

amd 2016 No. 27 s 689

s 357A ins 2010 No. 20 s 155

ch 4 pt 1 div 4 hdg ins 2010 No. 20 s 156

s 358 amd 2010 No. 20 s 157

ch 4 pt 1 div 4 hdg ins 2010 No. 20 s 158

s 359 amd 2010 No. 20 s 159

s 359A ins 2010 No. 20 s 160

ch 4 pt 1 div 4 hdg ins 2010 No. 20 s 160

s 360 sub 2010 No. 20 s 161

s 361 amd 2010 No. 20 s 162

s 362 amd 2010 No. 20 s 163

ch 4 pt 1 div 4 hdg ins 2010 No. 20 s 164

s 363 amd 2010 No. 20 s 165

s 365 sub 2010 No. 20 s 166

s 366 ins 2010 No. 20 s 166

sub 2019 No. 17 s 351

s 367 sub 2019 No. 17 s 351

ch 4 pt 2 hdg sub 2012 No. 29 s 29

ch 4 pt 2 div 1 hdg ins 2012 No. 29 s 29

s 370 def authorised alternative procedure amd 2014 No. 51 s 39

s 370 sub 2012 No. 29 s 29

s 371 sub 2012 No. 29 s 29

s 371A ins 2012 No. 29 s 29

ch 4 pt 2 div 2 hdg ins 2012 No. 29 s 29

s 371B ins 2012 No. 29 s 29

s 371C ins 2012 No. 29 s 29

s 371D ins 2012 No. 29 s 29

ch 4 pt 2 div 3 hdg ins 2012 No. 29 s 29

s 371E ins 2012 No. 29 s 29

s 371F ins 2012 No. 29 s 29

s 371G ins 2012 No. 29 s 29

s 371H ins 2012 No. 29 s 29

ch 4 pt 2 div 4 hdg ins 2012 No. 29 s 29

s 372 amd 2012 No. 29 s 30

s 373 amd 2012 No. 29 s 31

ch 4 pt 2 div 5 hdg ins 2012 No. 29 s 32

s 374 sub 2012 No. 29 s 32

ch 4 pt 2 div 6 hdg ins 2012 No. 29 s 32

s 375 sub 2012 No. 29 s 32

s 376 ins 2012 No. 29 s 32

ch 4 pt 2 div 7 hdg ins 2012 No. 29 s 32

s 377 ins 2012 No. 29 s 32

ch 4 pt 2 div 8 hdg ins 2012 No. 29 s 32

s 378 ins 2012 No. 29 s 32

s 379 ins 2012 No. 29 s 32

amd 2014 No. 51 s 40

s 380 ins 2012 No. 29 s 32

s 381 ins 2012 No. 29 s 32

amd 2014 No. 51 s 41

s 382 ins 2012 No. 29 s 32

ch 4 pt 2 div 9 hdg ins 2012 No. 29 s 32

s 383 ins 2012 No. 29 s 32

s 384 ins 2012 No. 29 s 32

s 385 ins 2012 No. 29 s 32

ch 4 pt 2 div 10 hdg ins 2012 No. 29 s 32

s 386 ins 2012 No. 29 s 32

s 387 ins 2012 No. 29 s 32

ch 4 pt 3 hdg ins 2012 No. 29 s 32

ch 4 pt 3 div 1 hdg ins 2012 No. 29 s 32

sub 2017 No. 11 s 27

s 388 ins 2012 No. 29 s 32

sub 2017 No. 11 s 27

s 389 ins 2012 No. 29 s 32

sub 2017 No. 11 s 27

ch 4 pt 3 div 2 hdg ins 2012 No. 29 s 32

sub 2017 No. 11 s 27

s 390 ins 2012 No. 29 s 32

amd 2014 No. 64 s 254 sch 1

sub 2017 No. 11 s 27

amd 2019 No. 17 s 352; 2020 No. 14 s 216

s 391 ins 2012 No. 29 s 32

om 2017 No. 11 s 27

s 392 ins 2012 No. 29 s 32

om 2017 No. 11 s 27

s 393 ins 2012 No. 29 s 32

om 2017 No. 11 s 27

s 394 ins 2012 No. 29 s 32

om 2017 No. 11 s 27

ch 4 pt 3 div 3 hdg ins 2012 No. 29 s 32

om 2017 No. 11 s 27

s 395 ins 2012 No. 29 s 32

amd 2014 No. 51 s 42; 2014 No. 64 s 254 sch 1

om 2017 No. 11 s 27

ch 4 pt 3 div 4 hdg ins 2012 No. 29 s 32

s 396 ins 2012 No. 29 s 32

amd 2014 No. 64 s 254 sch 1

s 397 ins 2012 No. 29 s 32

s 398 ins 2012 No. 29 s 32

ch 4 pt 3 div 5 hdg ins 2012 No. 29 s 32

s 399 ins 2012 No. 29 s 32

ch 4 pt 4 hdg ins 2017 No. 11 s 28

s 399A ins 2017 No. 11 s 28

s 399B ins 2017 No. 11 s 28

amd 2020 No. 14 s 217

s 399C ins 2017 No. 11 s 28

ch 4 pt 5 hdg ins 2020 No. 3 s 135B

exp 31 December 2023 (see s 399I)

s 399D ins 2020 No. 3 s 135B

exp 31 December 2023 (see s 399I)

s 399E ins 2020 No. 3 s 135B

exp 31 December 2023 (see s 399I)

s 399F ins 2020 No. 3 s 135B

amd 2022 No. 1 s 117 sch 1 pt 1

exp 31 December 2023 (see s 399I)

s 399G ins 2020 No. 3 s 135B

exp 31 December 2023 (see s 399I)

s 399H ins 2020 No. 3 s 135B

exp 31 December 2023 (see s 399I)

s 399I ins 2020 No. 3 s 135B

exp 31 December 2023 (see s 399I)

s 400 amd 2014 No. 16 s 81

s 410 amd 2010 No. 53 s 229; 2014 No. 16 s 82; 2014 No. 31 s 36

s 415 amd 2011 No. 6 s 139

s 418 amd 2011 No. 6 s 140

s 419 amd 2009 No. 46 s 140

s 422 amd 2011 No. 6 s 141

s 434 amd 2013 No. 23 s 352 sch 1 pt 1

ch 5 pt 5 div 1 hdg ins 2009 No. 46 s 141

s 435 sub 2009 No. 46 s 141

amd 2010 No. 53 s 230; 2014 No. 16 s 83; 2014 No. 31 s 37

ch 5 pt 5 div 2 hdg ins 2009 No. 46 s 141

s 436 amd 2009 No. 46 s 142

ch 5 pt 5 div 3 hdg ins 2009 No. 46 s 143

s 441 def event sub 2010 No. 53 s 231; 2014 No. 31 s 38

s 441 sub 2009 No. 46 s 143

s 442 ins 2009 No. 46 s 143

s 443 ins 2009 No. 46 s 143

s 444 ins 2009 No. 46 s 143

ch 5 pt 5A hdg ins 2014 No. 16 s 85

ch 5 pt 5A div 1 hdg ins 2014 No. 16 s 85

s 445 prev s 445 ins 2009 No. 46 s 143

om 2014 No. 16 s 84

pres s 445 ins 2014 No. 16 s 85

ch 5 pt 5A div 2 hdg ins 2014 No. 16 s 85

s 446 ins 2014 No. 16 s 85

s 447 ins 2014 No. 16 s 85

ch 5 pt 5A div 3 hdg ins 2014 No. 16 s 85

s 448 ins 2014 No. 16 s 85

s 449 ins 2014 No. 16 s 85

ch 5 pt 8 hdg sub 2009 No. 46 s 144

s 466 amd 2009 No. 24 s 969

ch 5 pt 8 div 3 hdg ins 2009 No. 46 s 145

s 468 sub 2009 No. 46 s 145

amd 2014 No. 16 s 86

s 469 ins 2009 No. 46 s 145

s 475 amd 2014 No. 16 s 101 sch 1

s 487 sub 2013 No. 51 s 226

amd 2014 No. 16 s 101 sch 1

s 487A ins 2013 No. 51 s 226

amd 2014 No. 16 s 101 sch 1; 2014 No. 31 s 39

s 497 amd 2012 No. 39 s 99; 2014 No. 16 s 101 sch 1

s 510 amd 2010 No. 20 s 167

s 511 sub 2009 No. 24 s 970

amd 2014 No. 16 s 87

s 512 amd 2009 No. 24 s 971; 2010 No. 20 s 168

s 513 amd 2009 No. 24 s 972

s 514 amd 2009 No. 24 s 973; 2010 No. 20 s 169

s 515 amd 2009 No. 24 s 974; 2014 No. 16 s 88

s 516 amd 2009 No. 24 s 975; 2014 No. 16 s 89

ch 7 pt 3 hdg sub 2009 No. 24 s 976

s 517 amd 2009 No. 24 s 977

sub 2014 No. 16 s 90

s 518 amd 2009 No. 24 s 978

s 519 amd 2009 No. 24 s 979

s 524 amd 2009 No. 24 s 980; 2014 No. 16 s 91

s 524A ins 2009 No. 24 s 981

s 530 amd 2013 No. 23 s 348

s 531 amd 2016 No. 63 s 1157 sch 6

s 538 amd 2012 No. 29 s 33

s 559 def relevant operational work amd 2016 No. 27 s 690

s 559 ins 2012 No. 29 s 34

s 560 om 2016 No. 27 s 691

s 561 amd 2009 No. 36 s 872 sch 2; 2010 No. 20 s 170; 2012 No. 29 s 35; 2012 No. 34 s 131

sub 2016 No. 27 s 692

s 562 amd 2009 No. 36 s 872 sch 2; 2012 No. 29 s 36

sub 2016 No. 27 s 692

s 571 amd 2009 No. 46 s 146; 2010 No. 20 s 171; 2010 No. 53 s 232; 2014 No. 16 s 92; 2014 No. 31 s 40

s 572 amd 2009 No. 46 s 147; 2010 No. 20 s 172

s 574 amd 2009 No. 46 s 148

s 575 amd 2014 No. 16 s 93; 2021 No. 18 s 18

amd 2023 No. 24 s 75 sch 1 pt 1

s 575A ins 2014 No. 16 s 94

amd 2021 No. 18 s 19

s 576 amd 2010 No. 20 s 173; 2014 No. 16 s 95

s 576A ins 2014 No. 16 s 96

s 578A ins 2014 No. 16 s 97

amd 2023 No. 24 s 75 sch 1 pt 1

s 578B ins 2014 No. 16 s 97

amd 2023 No. 24 s 75 sch 1 pt 1

s 578C ins 2023 No. 24 s 72

s 579 amd 2009 No. 46 s 149; 2010 No. 20 s 174; 2010 No. 53 s 233; 2012 No. 39 s 100; 2014 No. 31 s 41

s 579A ins 2010 No. 20 s 175

amd 2014 No. 17 s 184 sch 1 pt 4; 2024 No. 18 s 39 sch 1

s 580 amd 2010 No. 20 s 176; 2014 No. 16 s 101 sch 1

ch 9 hdg amd 2009 No. 36 s 872 sch 2

s 602 amd 2011 No. 8 s 120

s 628 amd 2010 No. 53 s 234; 2014 No. 31 s 42

s 629 amd 2009 No. 46 s 150

s 631 amd 2010 No. 20 s 177

s 632 amd 2010 No. 20 s 178

s 633 amd 2009 No. 46 s 151; 2010 No. 20 s 179; 2010 No. 53 s 235; 2012 No. 29 s 37; 2013 No. 23 s 349

ch 9 pt 6 hdg om 2009 No. 46 s 152

s 635 exp 1 July 2009 (see s 635(4))

AIA s 20A applies (see s 635(5))

ch 10 hdg ins 2009 No. 36 s 872 sch 2

sub 2010 No. 20 s 180

ch 10 pt 1 hdg ins 2010 No. 20 s 180

s 636 ins 2009 No. 36 s 872 sch 2

amd 2016 No. 27 s 693

ch 10 pt 2 hdg ins 2010 No. 20 s 181

s 637 ins 2009 No. 46 s 153

ch 10 pt 3 hdg ins 2010 No. 20 s 182

s 638 ins 2010 No. 20 s 182

s 639 ins 2010 No. 20 s 182

ch 10 pt 4 hdg ins 2010 No. 53 s 236

s 640 ins 2010 No. 53 s 236

s 641 ins 2010 No. 53 s 236

s 642 ins 2010 No. 53 s 236

s 643 ins 2010 No. 53 s 236

ch 10 pt 5 hdg ins 2012 No. 29 s 38

s 644 ins 2012 No. 29 s 38

s 645 ins 2012 No. 29 s 38

s 646 ins 2012 No. 29 s 38

s 647 ins 2012 No. 29 s 38

s 648 ins 2012 No. 29 s 38

s 649 ins 2012 No. 29 s 38

s 650 ins 2012 No. 29 s 38

s 651 ins 2012 No. 29 s 38

om 2013 No. 39 s 109 sch 2

ch 10 pt 6 hdg ins 2013 No. 23 s 350

ch 10 pt 6 div 1 hdg ins 2013 No. 23 s 350

s 652 ins 2013 No. 23 s 350

s 653 ins 2013 No. 23 s 350

s 654 ins 2013 No. 23 s 350

s 655 ins 2013 No. 23 s 350

s 656 ins 2013 No. 23 s 350

s 657 ins 2013 No. 23 s 350

s 658 ins 2013 No. 23 s 350

ch 10 pt 6 div 2 hdg ins 2013 No. 23 s 350

s 659 ins 2013 No. 23 s 350

ch 10 pt 7 hdg ins 2014 No. 16 s 98

ch 10 pt 7 div 1 hdg ins 2014 No. 16 s 98

s 660 ins 2014 No. 16 s 98

ch 10 pt 7 div 2 hdg ins 2014 No. 16 s 98

s 661 ins 2014 No. 16 s 98

s 662 ins 2014 No. 16 s 98

s 663 ins 2014 No. 16 s 98

s 664 ins 2014 No. 16 s 98

ch 10 pt 7 div 3 hdg ins 2014 No. 16 s 42

s 665 ins 2014 No. 16 s 42

s 666 ins 2014 No. 16 s 42

ch 10 pt 8 hdg ins 2014 No. 31 s 43

s 667 ins 2014 No. 31 s 43

s 668 ins 2014 No. 31 s 43

s 669 ins 2014 No. 31 s 43

s 670 ins 2014 No. 31 s 43

s 671 ins 2014 No. 31 s 43

ch 10 pt 9 hdg ins 2015 No. 4 s 87

s 672 ins 2015 No. 4 s 87

ch 10 pt 10 hdg ins 2016 No. 27 s 694

s 673 ins 2016 No. 27 s 694

ch 10 pt 11 hdg ins 2017 No. 11 s 29

s 674 ins 2017 No. 11 s 29

ch 10 pt 12 hdg ins 2019 No. 17 s 353

s 675 s 675 ins 2019 No. 17 s 353

s 676 s 676 ins 2019 No. 17 s 353

s 677 s 677 ins 2019 No. 17 s 353

ch 10 pt 13 hdg ins 2023 No. 24 s 73

s 678 ins 2023 No. 24 s 73

s 679 ins 2023 No. 24 s 73

s 680 ins 2023 No. 24 s 73

s 681 ins 2023 No. 24 s 73

ch 10A hdg ins 2009 No. 46 s 153

om 2010 No. 20 s 181

sch 1 amd 2011 No. 31 s 407

sch 3 def 2009 restructuring Act ins 2012 No. 1 s 104 (1)

sch 3 def alternative procedure ins 2012 No. 29 s 39(2)

sch 3 def animal husbandry activities ins 2010 No. 20 s 183(2)

sch 3 def annual preparedness report ins 2012 No. 29 s 39(2)

sch 3 def annual report amd 2010 No. 20 s 183(3)

sub 2014 No. 16 s 99(1)–(2)

sch 3 def appropriately qualified om 2014 No. 16 s 99(1)

sch 3 def approval period ins 2012 No. 29 s 39(2)

amd 2017 No. 11 s 30 (3)

sch 3 def approved drinking water quality management plan amd 2014 No. 16 s 99(3)

sch 3 def approved emergency action plan ins 2012 No. 29 s 39(2)

sch 3 def approved flood mitigation manual ins 2012 No. 29 s 39(2)

sch 3 def approved system leakage management plan om 2014 No. 16 s 99(1)

sch 3 def assessment manager sub 2009 No. 36 s 872 sch 2

om 2016 No. 27 s 695(1)

sch 3 def associated works ins 2020 No. 3 s 135C(2)

sch 3 def auditor amd 2014 No. 16 s 99 (4)

sub 2023 No. 24 s 74(1)–(2)

sch 3 def authorisation request information ins 2012 No. 29 s 39(2)

sch 3 def authorised alternative procedure ins 2012 No. 29 s 39(2)

amd 2014 No. 51 s 43

sch 3 def available for inspection and purchase om 2014 No. 16 s 99 (1)

sch 3 def chairperson ins 2012 No. 29 s 39(2)

sch 3 def coal seam gas ins 2010 No. 53 s 237(2)

om 2014 No. 31 s 44 (1)

sch 3 def coal seam gas water ins 2010 No. 53 s 237(2)

om 2014 No. 31 s 44 (1)

sch 3 def commencement ins 2010 No. 53 s 237(2)

sub 2012 No. 29 s 39

sch 3 def commission water restriction om 2012 No. 39 s 101(1)

sch 3 def concurrence agency sub 2009 No. 36 s 872 sch 2

om 2016 No. 27 s 695(1)

sch 3 def condition sub 2014 No. 16 s 99(1)–(2)

sch 3 def connection sub 2014 No. 16 s 101 sch 1

sch 3 def cost recovery notice ins 2014 No. 31 s 44(2)

sch 3 def costs and expenses ins 2014 No. 31 s 44(2)

sch 3 def CSG (aquifer) recycled water scheme ins 2010 No. 53 s 237(2)

om 2014 No. 31 s 44 (1)

sch 3 def CSG emergency release ins 2011 No. 31 s 396(2)

om 2014 No. 31 s 44 (1)

sch 3 def CSG environmental authority ins 2010 No. 53 s 237(2)

sub 2011 No. 31 s 396; 2012 No. 16 s 78 sch

om 2014 No. 31 s 44 (1)

sch 3 def CSG (pt 9A, div 3) scheme ins 2010 No. 53 s 237(2)

om 2014 No. 31 s 44 (1)

sch 3 def CSG recycled water scheme ins 2010 No. 53 s 237(2)

om 2014 No. 31 s 44 (1)

sch 3 def current infrastructure owner ins 2013 No. 23 s 351(2)

sch 3 def customer amd 2010 No. 20 s 183(4)–(7); 2012 No. 1 s 104(2)–(3)

sch 3 def cybersecurity information ins 2021 No. 18 s 20

sch 3 def dam failure hazard ins 2012 No. 29 s 39(2)

om 2017 No. 11 s 30 (1)

sch 3 def dam hazard ins 2017 No. 11 s 30(2)

sch 3 def dam hazard event ins 2017 No. 11 s 30(2)

sch 3 def department’s website ins 2012 No. 29 s 39(2)

om 2023 No. 24 s 74(1)

sch 3 def designated region om 2012 No. 39 s 101 (1)

sch 3 def development sub 2009 No. 36 s 872 sch 2

amd 2016 No. 27 s 695 (3)

sch 3 def development application om 2016 No. 27 s 695 (1)

sch 3 def development condition amd 2016 No. 27 s 695 (4)

sch 3 def development permit ins 2012 No. 39 s 101(2)

sch 3 def disaster district ins 2012 No. 29 s 39(2)

sch 3 def Disaster Management Act ins 2012 No. 29 s 39(2)

sch 3 def disaster management plan ins 2012 No. 29 s 39(2)

sch 3 def disaster management review report ins 2012 No. 29 s 39(2)

om 2017 No. 11 s 30 (1)

sch 3 def disaster management review response ins 2012 No. 29 s 39(2)

om 2017 No. 11 s 30 (1)

sch 3 def distributor-retailer ins 2010 No. 20 s 183(2)

amd 2012 No. 1 s 104 (4)

sch 3 def district group ins 2012 No. 29 s 39(2)

sch 3 def downstream release hazard ins 2012 No. 29 s 39(2)

om 2017 No. 11 s 30 (1)

sch 3 def drinking water quality management plan audit report ins 2014 No. 16 s 99(2)

amd 2023 No. 24 s 74(3)

sch 3 def drinking water quality management plan report ins 2014 No. 16 s 99(2)

om 2023 No. 24 s 74(1)

sch 3 def drinking water service amd 2010 No. 53 s 237 (3); 2014 No. 31 s 44 (3)

sch 3 def drinking water service annual report ins 2023 No. 24 s 74(2)

sch 3 def drought management plan om 2014 No. 16 s 99 (1)

sch 3 def dual reticulation system ins 2013 No. 23 s 351(2)

sch 3 def effective day ins 2017 No. 11 s 30(2)

sch 3 def emergency action plan ins 2012 No. 29 s 39(2)

sch 3 def emergency condition ins 2012 No. 29 s 39(2)

om 2017 No. 11 s 30 (1)

sch 3 def emergency event ins 2012 No. 29 s 39(2)

sch 3 def emergency event interim report ins 2012 No. 29 s 39(2)

sch 3 def emergency event report ins 2012 No. 29 s 39(2)

sch 3 def emergency management chief executive ins 2012 No. 29 s 39(2)

sch 3 def EP Act authorisation ins 2011 No. 31 s 396(2)

amd 2012 No. 43 s 324

om 2014 No. 31 s 44 (1)

sch 3 def event ins 2014 No. 31 s 44(2)

sch 3 def exclusion decision ins 2010 No. 53 s 237(2)

om 2014 No. 31 s 44 (1)

sch 3 def existing approval period ins 2012 No. 29 s 39(2)

sch 3 def existing CSG recycled water scheme ins 2010 No. 53 s 237(2)

om 2014 No. 31 s 44 (1)

sch 3 def existing dam ins 2012 No. 29 s 39(2)

sch 3 def existing flood mitigation manual ins 2012 No. 29 s 39(2)

sch 3 def existing procedure ins 2012 No. 29 s 39(2)

sch 3 def external review ins 2009 No. 24 s 982(2)

sch 3 def feasibility advice ins 2012 No. 29 s 39(2)

om 2017 No. 11 s 30 (1)

sch 3 def flood event ins 2012 No. 29 s 39(2)

sch 3 def flood event interim report ins 2012 No. 29 s 39(2)

sch 3 def flood event report ins 2012 No. 29 s 39(2)

sch 3 def flood mitigation manual sub 2012 No. 29 s 39

sch 3 def forecast system ins 2012 No. 29 s 39(2)

sch 3 def full supply level sub 2017 No. 11 s 30(1)–(2)

sch 3 def greywater om 2010 No. 20 s 183 (1)

sch 3 def hazardous waste dam ins 2010 No. 20 s 183(2)

sch 3 def health department ins 2010 No. 20 s 183(2)

sch 3 def hydraulic impact zone ins 2010 No. 53 s 237(2)

om 2014 No. 31 s 44 (1)

sch 3 def impact information ins 2012 No. 29 s 39(2)

om 2017 No. 11 s 30 (1)

sch 3 def impact information notice ins 2012 No. 29 s 39(2)

om 2017 No. 11 s 30 (1)

sch 3 def improvement plan ins 2014 No. 16 s 99(2)

sch 3 def incident and emergency response plan ins 2010 No. 53 s 237(2)

sch 3 def incoming related entity ins 2013 No. 23 s 351(2)

sch 3 def information notice sub 2009 No. 24 s 982

amd 2010 No. 20 s 183 (8)

sch 3 def information requirement amd 2010 No. 53 s 237 (4); 2014 No. 16 ss 99 (4), 101 sch 1; 2014 No. 31 s 44 (4)

sch 3 def interested entity ins 2013 No. 23 s 351(2)

om 2014 No. 16 s 99 (1)

sch 3 def interim period ins 2010 No. 53 s 237(2)

om 2014 No. 31 s 44 (1)

sch 3 def interim recycled water management plan ins 2010 No. 53 s 237(2)

om 2014 No. 31 s 44 (1)

sch 3 def interim resource operations licence sub 2014 No. 64 s 254 sch 1

sch 3 def internal audit ins 2023 No. 24 s 74(2)

sch 3 def internal review application ins 2009 No. 24 s 982(2)

sch 3 def KPI ins 2014 No. 16 s 99(2)

sch 3 def lake ins 2010 No. 53 s 237(2)

sch 3 def local disaster area ins 2012 No. 29 s 39(2)

sch 3 def local disaster management plan ins 2012 No. 29 s 39(2)

om 2017 No. 11 s 30 (1)

sch 3 def Local Government Act sub 2009 No. 17 s 331 sch 1

sch 3 def local government entity ins 2019 No. 17 s 354(2)

sch 3 def local group ins 2012 No. 29 s 39(2)

sch 3 def mining activity om 2009 No. 3 s 606(1)

sch 3 def multiple-entity recycled water scheme amd 2010 No. 20 s 183(9)

sub 2010 No. 53 s 237(1)–(2)

amd 2014 No. 31 s 44(5)–(6)

sch 3 def new infrastructure owner ins 2013 No. 23 s 351(2)

sch 3 def new service provider ins 2013 No. 23 s 351(2)

sch 3 def noncompliance ins 2014 No. 31 s 44(2)

sch 3 def notice response ins 2017 No. 11 s 30(2)

sch 3 def operating agent ins 2013 No. 23 s 351(2)

sch 3 def outdoor water use conservation plan om 2014 No. 16 s 99 (1)

sch 3 def outgoing related entity ins 2013 No. 23 s 351(2)

sch 3 def owner amd 2010 No. 20 s 183(10)

sch 3 def performance audit report ins 2014 No. 16 s 99(2)

amd 2023 No. 24 s 74(4)

sch 3 def performance report ins 2014 No. 16 s 99(2)

sch 3 def petroleum activity om 2009 No. 3 s 606 (1)

sch 3 def petroleum well ins 2010 No. 53 s 237(2)

sch 3 def Planning Act sub 2009 No. 36 s 872 sch 2; 2016 No. 27 s 695(1)–(2)

sch 3 def Planning Act offence sub 2009 No. 36 s 872 sch 2

amd 2016 No. 27 s 695 (5)

sch 3 def post supply obligation ins 2010 No. 53 s 237(2)

om 2014 No. 31 s 44(1)

sch 3 def premises amd 2009 No. 36 s 872 sch 2; 2016 No. 27 s 695 (6)

sch 3 def prescribed person ins 2014 No. 31 s 44(2)

sch 3 def prescribed related entity ins 2013 No. 23 s 351(2)

sch 3 def proposed temporary full supply level ins 2012 No. 29 s 39(2)

om 2017 No. 11 s 30 (1)

sch 3 def public health conditions ins 2011 No. 31 s 396(2)

om 2014 No. 31 s 44 (1)

sch 3 def publish sub 2014 No. 16 s 99(1)–(2); 2023 No. 24 s 74(1)–(2)

sch 3 def Queensland Government website ins 2023 No. 24 s 74(2)

sch 3 def recycled water amd 2010 No. 20 s 183 (11)

sub 2010 No. 53 s 237(1)–(2); 2014 No. 31 s 44(1)–(2)

sch 3 def recycled water management plan sub 2010 No. 53 s 237(1)–(2); 2014 No. 31 s 44(1)–(2)

sch 3 def recycled water provider amd 2010 No. 53 s 237 (5)–(6); 2014 No. 31 s 44 (7)–(8)

sch 3 def reduced full supply level ins 2017 No. 11 s 30(2)

sch 3 def referable dam notice ins 2017 No. 11 s 30(2)

sch 3 def referral agency sub 2009 No. 36 s 872 sch 2

om 2016 No. 27 s 695 (1)

sch 3 def regular audit amd 2014 No. 16 s 99 (6)

sub 2023 No. 24 s 74(1)–(2)

sch 3 def regulator conditions sub 2014 No. 16 s 99(1)–(2)

sch 3 def regulator notice ins 2010 No. 20 s 183(2)

sch 3 def relevant disaster management group ins 2012 No. 29 s 39(2)

om 2017 No. 11 s 30 (1)

sch 3 def relevant district group ins 2012 No. 29 s 39(2)

om 2017 No. 11 s 30 (1)

sch 3 def relevant infrastructure owner ins 2013 No. 23 s 351(2)

sch 3 def relevant local group ins 2012 No. 29 s 39(2)

om 2017 No. 11 s 30 (1)

sch 3 def relevant location ins 2010 No. 53 s 237(2)

om 2014 No. 31 s 44 (1)

sch 3 def relevant operational work ins 2012 No. 29 s 39(2)

sch 3 def relevant service ins 2013 No. 23 s 351(2)

sch 3 def relevant service provider ins 2014 No. 16 s 99(2)

sch 3 def report requirement ins 2014 No. 16 s 99(2)

sch 3 def resource operations licence sub 2014 No. 64 s 254 sch 1

sch 3 def resource operations plan ins 2012 No. 29 s 39(2)

sch 3 def responsible entity sub 2010 No. 53 s 237(1)–(2)

amd 2014 No. 31 s 44 (9)–(10)

sch 3 def responsible person ins 2012 No. 29 s 39(2)

sch 3 def review application om 2009 No. 24 s 982 (1)

sch 3 def safety condition amd 2010 No. 20 s 183 (12)

sch 3 def safety requirements ins 2012 No. 29 s 39(2)

sch 3 def sanitary drain amd 2018 No. 17 s 197 sch 2

sch 3 def seepage water ins 2011 No. 31 s 408(2)

sch 3 def seepage water approval ins 2011 No. 31 s 408(2)

sch 3 def SEQ Water Grid Manager ins 2009 No. 46 s 154

om 2012 No. 39 s 101 (1)

sch 3 def service provider sub 2019 No. 17 s 354(1)–(2)

sch 3 def service provider’s infrastructure ins 2013 No. 23 s 351(2)

sch 3 def sewerage service amd 2019 No. 17 s 354 (3)–(4)

sch 3 def sewerage service provider amd 2013 No. 23 s 351 (3)

sch 3 def single-entity recycled water scheme sub 2010 No. 53 s 237(1)–(2)

amd 2014 No. 31 s 44(11)–(12)

sch 3 def small service provider (non-urban) ins 2012 No. 29 s 39(2)

om 2014 No. 16 s 99 (1)

sch 3 def spillway works ins 2020 No. 3 s 135C(2)

sch 3 def staged water connection ins 2014 No. 16 s 101 sch 1

sch 3 def State disaster management plan ins 2017 No. 11 s 30(2)

sch 3 def stock purposes amd 2014 No. 7 s 578 sch 4 pt 2

sch 3 def strategic asset management plan om 2014 No. 16 s 99 (1)

sch 3 def suitably qualified amd 2023 No. 24 s 74(5)

sch 3 def supply amd 2010 No. 20 s 183 (13)–(14); 2010 No. 53 s 237 (7)–(8)

sub 2011 No. 31 s 396; 2014 No. 31 s 44(1)–(2)

sch 3 def system leakage management plan om 2014 No. 16 s 99 (1)

sch 3 def system operating plan report ins 2014 No. 16 s 99(2)

sch 3 def temporary full supply level ins 2012 No. 29 s 39(2)

amd 2017 No. 11 s 30 (4)

sch 3 def trade waste approval sub 2011 No. 31 s 408

sch 3 def trade waste compliance notice om 2010 No. 20 s 183 (1)

sch 3 def transferee om 2013 No. 23 s 351 (1)

sch 3 def transferor om 2013 No. 23 s 351 (1)

sch 3 def transitional period ins 2010 No. 53 s 237(2)

sch 3 def wastewater amd 2009 No. 3 s 606(2); 2010 No. 20 s 183 (15); 2012 No. 16 s 78 sch

sch 3 def water advice om 2014 No. 16 s 99 (1)

sch 3 def water approval ins 2014 No. 16 s 101 sch 1

sch 3 def water entitlement amd 2014 No. 64 s 254 sch 1

sch 3 def water licence sub 2014 No. 64 s 254 sch 1

sch 3 def water quality criteria amd 2010 No. 20 s 183 (16)–(17); 2014 No. 16 s 99 (7)

sch 3 def water security ins 2012 No. 29 s 39(2)

sub 2017 No. 11 s 30(1)–(2)

sch 3 def water service amd 2019 No. 17 s 354 (5)–(6)

sch 3 def water service provider amd 2013 No. 23 s 351 (4);

sch 3 def water source ins 2010 No. 53 s 237(2)

sch 3 def water supply incident ins 2014 No. 31 s 44(2)

sch 3 def weir ins 2010 No. 20 s 183(2)

sub 2010 No. 53 s 237(1)–(2)

sch 3 def withdrawn SEQ council ins 2012 No. 1 s 104 (1)

sch 3 def works amd 2013 No. 23 s 351 (5)

sub 2020 No. 3 s 135C

Water Supply (Safety and Reliability) Act 2008