Economic Development Act 2012
ss 1–2 commenced on date of assent
ch 8, pts 1–4, 7–8, ss 284–285, 293, 295–299, 302, 306–307, 311, 315–316, 318, 319 (to the extent it ins s 192), sch 2 amdt of the Disaster Management Act 2003, the Environmental Protection Act 1994, the State Development and Public Works Organisation Act 1971, amdts 1–8, 14–18, 24–30 commenced on date of assent (see s 2)
remaining provisions commenced 1 February 2013 (2013 SL No. 1)
Economic Development Act 2012 ss 1–2, ch 7 pt 1
ss 1–2 commenced on date of assent
remaining provisions commenced 1 February 2013 (2013 SL No. 1)
State Development, Infrastructure and Planning (Red Tape Reduction) and Other Legislation Amendment Act 2014 chs 1–2 pt 1
ss 1–2 commenced on date of assent
remaining provisions commenced 1 October 2014 (2014 SL No. 209)
Sustainable Ports Development Act 2015 ss 1, 54 sch 2
commenced on date of assent
Queen’s Wharf Brisbane Act 2016
remaining provisions comm 27 May 2016 (2016 SL No. 61)
Planning (Consequential) and Other Legislation Amendment Act 2016
ss 1–2 comm on date of assent
pts 2–69 comm 3 July 2017 (automatic commencement under AIA s 15DA(2))
Note—The Planning Act 2016 was renumbered in the first reprint—see 2016 Act No. 26 s 320A. Cross-references to the Planning Act 2016 have been updated to reflect the renumbering.
Cross River Rail Delivery Authority Act 2016
pt 1 hdg, div 1, hdg, ss 3–5, div 2, pts 2–9, sch 1 comm 14 April 2017 (2017 SL No. 54)
Plumbing and Drainage Act 2018
pt 1
div 1 (other than ss 1–2), div 2, pts 2–7, pt 8
div 1, ss 159–173, 174, pt 9
div 1, s 176F
(2), pt 9
div 2, div 4, sch 1, sch 2 (other than amdts of Building Industry Fairness (Security of Payment) Act 2017) comm 1 July 2019 (2019 SL No. 41)
Economic Development and Other Legislation Amendment Act 2019
pts 1–2, pt 4–5, 6
divs 1–2, 7
divs 1–2, 8–9, 11, 13, 14
divs 1–2, 15–20, sch 1
pt 1 comm on date of assent
pts 3, 6
div 3, 7
div 3, 10, 12, sch 1
pt 2 (other than amdt of the Dispute Resolution Centres Act 1990) comm 9 December 2019 (2019 SL No. 230)
Public Health and Other Legislation (Public Health Emergency) Amendment Act 2020pt 4 comm on date of assent
Public Sector Act 2022s 365 sch 3 comm 1 March 2023 (see s 2)Justice and Other Legislation Amendment Act 2023 s 247 sch 1 ss 2 (2), 4 comm 1 February 2024 (2024 SL No. 1) Housing Availability and Affordability (Planning and Other Legislation Amendment) Bill 2023Economic Development and Other Legislation Amendment Bill 2024Economic Development Amendment Bill 2024 [No ATD]
1History notesLong title amd 2012 No. 43 s 218s 4 amd 2016 No. 17 s 88s 6 amd 2012 No. 43 s 219s 13 amd 2016 No. 17 s 89s 19A ins 2019 No. 11 s 18s 26 amd 2014 No. 40 s 4s 30 amd 2019 No. 11 s 72s 31 amd 2019 No. 11 s 73s 32 amd 2019 No. 11 s 74s 33 amd 2016 No. 17 s 90; 2019 No. 11 s 19ch 3 pt 2 div 1 hdg amd 2019 No. 11 s 20ch 3 pt 2 div 1 sdiv 1 hdg ins 2019 No. 11 s 21s 34 amd 2014 No. 40 s 5; 2016 No. 27 s 168; 2019 No. 11 s 22s 35 amd 2014 No. 40 s 6; 2016 No. 17 s 91sub 2019 No. 11 s 23s 36 sub 2019 No. 11 s 23s 36A ins 2019 No. 11 s 23s 36B ins 2019 No. 11 s 23s 36C ins 2019 No. 11 s 23s 36D ins 2019 No. 11 s 23s 36E ins 2019 No. 11 s 23s 36F ins 2019 No. 11 s 23s 36G ins 2019 No. 11 s 23ch 3 pt 2 div 1 sdiv 2 hdg ins 2019 No. 11 s 24s 36H ins 2019 No. 11 s 24s 36I ins 2019 No. 11 s 24s 37 amd 2016 No. 27 s 169; 2019 No. 11 s 25s 38 amd 2016 No. 17 s 92sub 2019 No. 11 s 26s 39 sub 2019 No. 11 s 26s 40 sub 2019 No. 11 s 26s 40AA ins 2019 No. 11 s 26s 40AB ins 2019 No. 11 s 26s 40AC ins 2019 No. 11 s 26ch 3 pt 2 div 2A hdg ins 2016 No. 17 s 93s 40A ins 2016 No. 17 s 93amd 2019 No. 11 s 231 sch 1 pt 1s 40B ins 2016 No. 17 s 93s 40C ins 2016 No. 17 s 93amd 2016 No. 27 s 169A; 2019 No. 11 s 27s 40D ins 2016 No. 17 s 93s 40E ins 2016 No. 17 s 93ch 3 pt 2 div 2B hdg ins 2019 No. 11 s 28s 40F ins 2019 No. 11 s 28s 40G ins 2019 No. 11 s 28s 40H ins 2019 No. 11 s 28s 40I ins 2019 No. 11 s 28s 40J ins 2019 No. 11 s 28s 40K ins 2019 No. 11 s 28s 40L ins 2019 No. 11 s 28s 40M ins 2019 No. 11 s 28ch 3 pt 2 div 3 sdiv 1 hdg ins 2014 No. 40 s 7s 41 amd 2016 No. 17 s 94; 2016 No. 27 s 170; 2019 No. 11 s 29ch 3 pt 2 div 3 sdiv 2 hdg ins 2014 No. 40 s 8s 42 sub 2014 No. 40 s 8amd 2016 No. 17 s 95; 2019 No. 11 s 30s 42A ins 2014 No. 40 s 8s 42B ins 2014 No. 40 s 8s 42C ins 2014 No. 40 s 8amd 2019 No. 11 s 31s 42D ins 2014 No. 40 s 8s 42E ins 2014 No. 40 s 8amd 2019 No. 11 s 32s 42F ins 2014 No. 40 s 8s 42G ins 2014 No. 40 s 8s 42H ins 2014 No. 40 s 8amd 2019 No. 11 s 231 sch 1 pt 1s 42I ins 2014 No. 40 s 8s 42J ins 2014 No. 40 s 8amd 2019 No. 11 s 33s 42K ins 2014 No. 40 s 8amd 2016 No. 27 s 171; 2019 No. 11 s 34s 42L ins 2014 No. 40 s 8amd 2019 No. 11 s 35ch 3 pt 2 div 3 sdiv 3 hdg ins 2014 No. 40 s 8s 42M ins 2014 No. 40 s 8amd 2019 No. 11 s 36ch 3 pt 2 div 4 hdg amd 2016 No. 27 s 172s 43A ins 2019 No. 11 s 37s 44 amd 2016 No. 27 s 173s 45 amd 2016 No. 27 s 174s 47 sub 2014 No. 40 s 9; 2016 No. 27 s 175amd 2019 No. 11 s 38ch 3 pt 2 div 4 sdiv 2 hdg sub 2019 No. 11 s 39s 48 amd 2016 No. 17 s 96; 2016 No. 27 s 176sub 2019 No. 11 s 39s 49 amd 2016 No. 17 s 97; 2016 No. 27 s 177sub 2019 No. 11 s 39s 50 amd 2016 No. 17 s 98; 2016 No. 27 s 178sub 2019 No. 11 s 39s 50A ins 2019 No. 11 s 75s 51 amd 2016 No. 27 s 179sub 2019 No. 11 s 39s 51AA ins 2019 No. 11 s 39s 51AB ins 2019 No. 11 s 39s 51AC ins 2019 No. 11 s 39s 51AD ins 2019 No. 11 s 39s 51AE ins 2019 No. 11 s 39s 51AF ins 2019 No. 11 s 39s 51AG ins 2019 No. 11 s 39ch 3 pt 2 div 4 sdiv 3 hdg ins 2019 No. 11 s 39s 51AH ins 2019 No. 11 s 39s 51AI ins 2019 No. 11 s 39s 51AJ ins 2019 No. 11 s 39s 51AK ins 2019 No. 11 s 39s 51AL ins 2019 No. 11 s 39s 51AM ins 2019 No. 11 s 39s 51AN ins 2019 No. 11 s 39s 51AO ins 2019 No. 11 s 39s 51AP ins 2019 No. 11 s 39s 51AQ ins 2019 No. 11 s 39ch 3 pt 2 div 4A hdg ins 2019 No. 11 s 40s 51AR ins 2019 No. 11 s 40s 51AS ins 2019 No. 11 s 40s 51AT ins 2019 No. 11 s 40s 51AU ins 2019 No. 11 s 40ch 3 pt 2 div 4B hdg ins 2019 No. 11 s 76s 51AV ins 2019 No. 11 s 76s 51AW ins 2019 No. 11 s 76s 51A ins 2016 No. 17 s 99; 2016 No. 27 s 179As 53 amd 2019 No. 11 ss 41, 77s 54 amd 2019 No. 11 s 42s 56 sub 2019 No. 11 s 43s 57 amd 2016 No. 17 s 100; 2016 No. 27 s 180; 2019 No. 11 s 44s 58 amd 2019 No. 11 s 45s 59 amd 2019 No. 11 s 46s 63 amd 2015 No. 28 s 54 sch 2; 2019 No. 11 s 47s 64 sub 2019 No. 11 s 48s 65 amd 2019 No. 11 s 49s 66 sub 2014 No. 40 s 10amd 2015 No. 28 s 54 sch 2s 67 amd 2014 No. 40 s 11; 2019 No. 11 s 50s 68 sub 2019 No. 11 s 51s 69 sub 2019 No. 11 s 51s 70 om 2019 No. 11 s 52s 71 amd 2016 No. 27 s 181; 2019 No. 11 s 53ch 3 pt 4 hdg amd 2016 No. 17 s 101ch 3 pt 4 div 1AA hdg ins 2019 No. 11 s 78s 71A ins 2019 No. 11 s 78s 71B ins 2019 No. 11 s 78s 71C ins 2019 No. 11 s 78s 71D ins 2019 No. 11 s 78s 72 amd 2020 No. 11 s 9s 73 amd 2016 No. 17 s 102; 2019 No. 11 s 79s 74 amd 2016 No. 17 s 103om 2019 No. 11 s 54s 75 amd 2019 No. 11 s 80s 76 amd 2016 No. 17 s 104; 2019 No. 11 s 81s 77 amd 2016 No. 27 s 182s 78 amd 2016 No. 17 s 105s 80 amd 2016 No. 17 s 106; 2016 No. 27 s 183s 81 amd 2016 No. 27 s 184s 82 amd 2019 No. 11 s 82s 82A ins 2019 No. 11 s 83s 82B ins 2019 No. 11 s 84s 83 amd 2019 No. 11 s 85s 83A ins 2019 No. 11 s 86s 83B ins 2019 No. 11 s 86s 84 amd 2016 No. 17 s 107; 2019 No. 11 s 87s 84A ins 2019 No. 11 s 88s 84B ins 2019 No. 11 s 88s 84C ins 2019 No. 11 s 88s 84D ins 2019 No. 11 s 88s 84E ins 2019 No. 11 s 88s 84F ins 2019 No. 11 s 88s 85 amd 2019 No. 11 ss 55, 89s 86 amd 2016 No. 17 s 108; 2016 No. 27 s 185s 87 amd 2016 No. 17 s 109; 2016 No. 27 s 186; 2019 No. 11 s 56s 88 amd 2014 No. 40 s 12; 2019 No. 11 s 57s 90 amd 2016 No. 27 s 187s 93 amd 2019 No. 11 s 90s 97 amd 2016 No. 27 s 188s 98 amd 2019 No. 11 s 91s 99 amd 2016 No. 17 s 110; 2019 No. 11 ss 58, 92s 100 amd 2016 No. 27 s 189s 103 amd 2016 No. 17 s 111sub 2019 No. 11 s 93s 104 amd 2014 No. 40 s 13sub 2016 No. 27 s 190ch 3 pt 5 hdg sub 2019 No. 11 s 94ch 3 pt 5 div 1AA hdg ins 2019 No. 11 s 95s 104A ins 2019 No. 11 s 95s 108 amd 2019 No. 11 ss 59, 96s 109 amd 2016 No. 27 s 191s 110 amd 2016 No. 27 s 192; 2019 No. 11 s 97s 111 amd 2019 No. 11 s 98s 112 amd 2019 No. 11 s 99s 112A ins 2019 No. 11 s 100s 112B ins 2019 No. 11 s 100s 113 sub 2019 No. 11 s 101s 114 amd 2014 No. 40 s 14; 2016 No. 17 s 112ch 3 pt 6 hdg sub 2014 No. 40 s 15ch 3 pt 6 div 1 hdg ins 2014 No. 40 s 15s 115 amd 2014 No. 40 s 16; 2016 No. 17 s 113ch 3 pt 6 div 2 hdg ins 2014 No. 40 s 17s 116A def charge area amd 2016 No. 17 s 114s 116A ins 2014 No. 40 s 17s 116B ins 2014 No. 40 s 17s 116C ins 2014 No. 40 s 17s 116D ins 2014 No. 40 s 17s 116E ins 2014 No. 40 s 17amd 2016 No. 17 s 115; 2019 No. 11 s 60ch 3 pt 6 div 3 hdg ins 2014 No. 40 s 17s 116F ins 2014 No. 40 s 17s 116G ins 2014 No. 40 s 17s 117 sub 2014 No. 40 s 18ch 3 pt 7 hdg amd 2016 No. 17 s 116s 118 amd 2016 No. 17 s 117s 119 amd 2019 No. 11 s 61s 120 sub 2019 No. 11 s 62s 120A ins 2019 No. 11 s 62s 121 amd 2014 No. 40 s 19; 2016 No. 17 s 118; 2019 No. 11 s 63s 122 amd 2016 No. 17 s 119; 2019 No. 11 s 64ch 3 pt 8 hdg amd 2016 No. 17 s 120s 122A ins 2019 No. 11 s 102s 122B ins 2019 No. 11 s 102s 123 amd 2016 No. 17 s 121; 2016 No. 27 s 193; 2019 No. 11 s 103s 124 amd 2016 No. 17 s 122s 126 amd 2016 No. 17 s 123s 127 amd 2014 No. 40 s 20; 2016 No. 17 s 124; 2016 No. 27 s 194s 129 amd 2019 No. 11 s 231 sch 1 pt 1s 129A ins 2019 No. 11 s 104s 132 amd 2022 No. 34 s 365 sch 3s 134 amd 2023 No. 23 s 247 sch 1 s 2(2)ch 4 pt 2 hdg om 2019 No. 11 s 65ch 4 pt 2 div 1 hdg om 2019 No. 11 s 65s 144 om 2019 No. 11 s 65s 145 om 2019 No. 11 s 65ch 4 pt 2 div 2 hdg om 2019 No. 11 s 65s 146 om 2019 No. 11 s 65s 147 om 2019 No. 11 s 65s 148 om 2019 No. 11 s 65s 149 om 2019 No. 11 s 65ch 4 pt 2 div 3 hdg om 2019 No. 11 s 65s 150 om 2019 No. 11 s 65s 151 om 2019 No. 11 s 65s 152 om 2019 No. 11 s 65s 153 om 2019 No. 11 s 65s 154 om 2019 No. 11 s 65s 155 om 2019 No. 11 s 65s 156 om 2019 No. 11 s 65s 157 om 2019 No. 11 s 65ch 4 pt 3A hdg ins 2019 No. 11 s 65As 159A ins 2019 No. 11 s 65As 159B ins 2019 No. 11 s 65As 159C ins 2019 No. 11 s 65As 159D ins 2019 No. 11 s 65As 160 amd 2019 No. 11 s 231 sch 1 pt 1; 2023 No. 23 s 247 sch 1 s 4s 161 amd 2019 No. 11 s 231 sch 1 pt 1s 162 amd 2019 No. 11 s 231 sch 1 pt 1s 164 amd 2019 No. 11 s 66s 166 sub 2019 No. 11 s 105s 167 amd 2019 No. 11 s 231 sch 1 pt 2s 169 amd 2016 No. 66 s 78; 2019 No. 11 s 231 sch 1 pt 1; 2020 No. 11 s 10s 171 amd 2019 No. 11 s 231 sch 1 pt 1ch 5 pt 3A hdg ins 2019 No. 11 s 67s 171A ins 2019 No. 11 s 67s 171B ins 2019 No. 11 s 67s 171C ins 2019 No. 11 s 67ch 5 pt 3B hdg ins 2020 No. 11 s 11ch 5 pt 3B div 1 hdg ins 2020 No. 11 s 11s 171D ins 2020 No. 11 s 11ch 5 pt 3B div 2 hdg ins 2020 No. 11 s 11s 171E ins 2020 No. 11 s 11s 171F ins 2020 No. 11 s 11s 171G ins 2020 No. 11 s 11s 171H ins 2020 No. 11 s 11s 171I ins 2020 No. 11 s 11s 171J ins 2020 No. 11 s 11s 171K ins 2020 No. 11 s 11ch 5 pt 3B div 3 hdg ins 2020 No. 11 s 11s 171L ins 2020 No. 11 s 11ch 5 pt 4B div 4 hdg ins 2020 No. 11 s 11s 171M ins 2020 No. 11 s 11s 171N ins 2020 No. 11 s 11s 171O ins 2020 No. 11 s 11s 172 amd 2014 No. 40 s 21; 2016 No. 17 s 125; 2019 No. 11 ss 68, 106s 174 amd 2019 No. 11 s 231 sch 1 pt 1s 176 amd 2019 No. 11 s 69ch 6 hdg amd 2016 No. 17 s 126s 177 def repealed Sustainable Planning Act ins 2016 No. 27 s 196s 177 def SPA development approval ins 2016 No. 27 s 196s 195 amd 2016 No. 27 s 197s 204 amd 2016 No. 27 s 198s 213 amd 2016 No. 27 s 199s 215 exp 1 February 2014 (see s 215(4))ch 7 hdg ins 2016 No. 17 s 127ch 7 pt 1 hdg ins 2016 No. 17 s 127s 217 ins 2016 No. 17 s 127s 218 ins 2016 No. 17 s 127s 219 ins 2016 No. 17 s 127ch 7 pt 2 hdg ins 2016 No. 27 s 200s 220 ins 2016 No. 27 s 200s 221 ins 2016 No. 27 s 200s 222 ins 2016 No. 27 s 200s 223 ins 2016 No. 27 s 200s 224 ins 2016 No. 27 s 200ch 7 pt 3 hdg ins 2019 No. 11 s 70ch 7 pt 3 div 1 hdg ins 2019 No. 11 s 70s 225 ins 2019 No. 11 s 70ch 7 pt 3 div 2 hdg ins 2019 No. 11 s 70s 226 ins 2019 No. 11 s 70s 227 ins 2019 No. 11 s 70s 228 ins 2019 No. 11 s 70s 229 ins 2019 No. 11 s 70s 230 ins 2019 No. 11 s 70s 231 ins 2019 No. 11 s 70s 232 ins 2019 No. 11 s 70s 233 ins 2019 No. 11 s 70s 234 ins 2019 No. 11 s 70ch 7 pt 3 div 3 hdg ins 2019 No. 11 s 107s 235 ins 2019 No. 11 s 107s 236 ins 2019 No. 11 s 107s 237 ins 2019 No. 11 s 107sch 1 def additional land ins 2019 No. 11 s 71 (2)sch 1 def amendment application ins 2019 No. 11 s 71 (2)sch 1 def applicable event ins 2020 No. 11 s 12sch 1 def applicable event notice ins 2020 No. 11 s 12sch 1 def applicable event period ins 2020 No. 11 s 12sch 1 def assessment benchmarks ins 2016 No. 27 s 201 (2)sch 1 def authorising instrument ins 2014 No. 40 s 22 (2)sch 1 def authority om 2019 No. 11 s 71 (1)sch 1 def authority member om 2019 No. 11 s 71 (1)sch 1 def boundary change regulation ins 2019 No. 11 s 71 (2)sch 1 def building work amd 2016 No. 27 s 201 (3)sch 1 def business day ins 2014 No. 40 s 22 (2)sch 1 def charge area ins 2014 No. 40 s 22 (2)sch 1 def charge notice ins 2014 No. 40 s 22 (2)sch 1 def charging entity ins 2014 No. 40 s 22 (2)sch 1 def close relative amd 2019 No. 11 s 71 (3)sch 1 def commencement om 2016 No. 27 s 201 (1)sch 1 def committee member amd 2019 No. 11 s 71 (3A)sch 1 def communication ins 2019 No. 11 s 71 (2)sch 1 def community infrastructure designation om 2016 No. 27 s 201 (1)sch 1 def compliance statement ins 2019 No. 11 s 108sch 1 def development scheme sub 2019 No. 11 s 71 (1)–(2)sch 1 def distributor-retailer ins 2019 No. 11 s 71 (2)sch 1 def draft provisional land use plan ins 2019 No. 11 s 71 (2)sch 1 def drainage work amd 2018 No. 17 s 197 sch 2sch 1 def excluded land ins 2019 No. 11 s 71 (2)sch 1 def former PDA-associated development ins 2019 No. 11 s 71 (2)sch 1 def former PDA land ins 2019 No. 11 s 71 (2)sch 1 def freehold land ins 2019 No. 11 s 108sch 1 def government entity amd 2022 No. 34 s 365 sch 3sch 1 def infrastructure agreement amd 2016 No. 27 s 201 (4)sub 2019 No. 11 s 71 (1)–(2)sch 1 def infrastructure expenses recoupment charge ins 2014 No. 40 s 22 (2)sch 1 def interim land use plan sub 2019 No. 11 s 71 (1)–(2)sch 1 def lawful use amd 2016 No. 27 s 201 (5)sch 1 def local consultative committee ins 2019 No. 11 s 71 (2)sch 1 def material change of use sub 2016 No. 27 s 201 (1)–(2)sch 1 def MEDQ agent ins 2019 No. 11 s 108sch 1 def MEDQ employee ins 2019 No. 11 s 108sch 1 def minor administrative amendment sub 2019 No. 11 s 71 (1)–(2)sch 1 def minor boundary change ins 2019 No. 11 s 71 (2)sch 1 def notification requirements ins 2014 No. 40 s 22 (2)sch 1 def operational work amd 2016 No. 27 s 201 (6)sch 1 def PDA accepted development ins 2019 No. 11 s 71 (2)sch 1 def PDA-associated development ins 2016 No. 17 s 128 (1)sch 1 def PDA-associated land ins 2016 No. 17 s 128 (1)sch 1 def PDA change ins 2014 No. 40 s 22 (2)sch 1 def PDA exempt development om 2019 No. 11 s 71 (1)sch 1 def PDA exemption certificate ins 2019 No. 11 s 108sch 1 def PDA instrument change ins 2019 No. 11 s 71 (2)sch 1 def PDA self-assessable development om 2019 No. 11 s 71 (1)sch 1 def Planning Act ins 2016 No. 27 s 201 (2)sch 1 def Planning Act approval ins 2019 No. 11 s 71 (2)sch 1 def Planning and Environment Court om 2016 No. 27 s 201 (1)sch 1 def planning instrument amd 2016 No. 27 s 201 (7)sch 1 def planning instrument change ins 2014 No. 40 s 22 (2)sub 2019 No. 11 s 71 (1)–(2)sch 1 def planning scheme om 2016 No. 27 s 201 (1)sch 1 def plumbing work amd 2018 No. 17 s 197 sch 2sch 1 def prescribed assessment manager ins 2019 No. 11 s 71 (2)sch 1 def properly made application ins 2019 No. 11 s 108sch 1 def properly made date ins 2019 No. 11 s 108sch 1 def proposer ins 2014 No. 40 s 22 (2)sub 2019 No. 11 s 71 (1)–(2)sch 1 def proposer’s website ins 2014 No. 40 s 22 (2)sch 1 def provision ins 2014 No. 40 s 22 (2)sch 1 def provisional land use plan sub 2019 No. 11 s 71 (1)–(2)sch 1 def public response report ins 2014 No. 40 s 22 (2)sch 1 def public sector entity sub 2014 No. 40 s 22 (1)–(2)amd 2019 No. 11 s 71 (4)sch 1 def rateable land ins 2014 No. 40 s 22 (2)sch 1 def receiver ins 2019 No. 11 s 71 (2)sch 1 def reconfiguring a lot sub 2016 No. 27 s 201 (1)–(2)sch 1 def relevant change ins 2020 No. 11 s 12sch 1 def relevant charge ins 2014 No. 40 s 22 (2)sch 1 def relevant development amd 2016 No. 27 s 201 (8)sch 1 def relevant development instrument amd 2019 No. 11 s 71 (5)–(6)sch 1 def relevant document ins 2019 No. 11 s 71 (2)sch 1 def relevant land amd 2016 No. 27 s 201 (9)sch 1 def sending time ins 2019 No. 11 s 71 (2)sch 1 def SPA development application om 2016 No. 27 s 201 (1)sch 1 def SPA development approval om 2016 No. 27 s 201 (1)sch 1 def SPA preliminary approval om 2016 No. 27 s 201 (1)sch 1 def State interest ins 2019 No. 11 s 71 (2)sch 1 def submission period amd 2014 No. 40 s 22 (3)–(4); 2019 No. 11 s 71 (7)–(9)sch 1 def superseding public sector entity amd 2016 No. 17 s 128 (2)sub 2019 No. 11 s 71 (1)–(2)sch 1 def Sustainable Planning Act om 2016 No. 27 s 201 (1)sch 1 def temporary use licence ins 2020 No. 11 s 12sch 1 def water approval ins 2019 No. 11 s 71 (2)sch 1 def water connection aspect ins 2019 No. 11 s 71 (2)sch 1 def water infrastructure agreement ins 2019 No. 11 s 71 (2)sch 1 (prev sch 3) renum 2012 No. 43 s 220
Bill (Introduction)
Explanatory Note
Bill (3rd Reading)
Explanatory Note
Act 2012, No. 43