<?xml version="1.0" encoding="utf-8"?>
<!DOCTYPE subordleg PUBLIC "-//OQPC//DTD QuILLS Subordinate Legislation//EN" "Subordleg.dtd">
<!--************************************************************************************************************-->
<!--                                              DISCLAIMER                                                    -->
<!---->
<!--Queensland does not accept responsibility for the accuracy or completeness of material on this website      -->
<!--(or any other website referred to on this website) except as set out below. Users should exercise their     -->
<!--own skill and care in the use of the material.                                                              -->
<!---->
<!--No warranty is given that the material located on this site, or on any other site referred to on this site, -->
<!--is free from error or omission. Users should exercise their own skill and care with respect to the use of   -->
<!--the material. Accordingly, the State of Queensland and its servants and agents expressly disclaim liability -->
<!--for any act done or omission made in reliance on any such material and any consequences of any such act or  -->
<!--omission. This notice must not be erased.                                                                   -->
<!---->
<!--************************************************************************************************************-->
<subordleg title="Water Resource (Burdekin Basin) Plan 2007" year.citation="2007" no="189" publication.date="2014-06-27" enabling.title="Water Act 2000" enabling.acts="UNKNOWN" sub.leg.type="plan" amending="none" print.type="reprint" first.valid.date="2014-06-27T00:00:00+10:00" end.valid.date="2016-12-06T00:00:00+10:00" published.date="2007-08-03T00:00:00+10:00" published.how="website" published.ref="pp 1785–6" stage.repeal="1" made.by.position="Governor in Council" id="sl-2007-0189" version.desc.id="766f4de1-662b-4e0e-a7eb-9f7f9cbc30e2" version.series.id="dc97882f-ecad-478b-a381-e92d44eef1d6" in.force="allinforce"><coverdata id="cd" guid="_5710c565-ce91-4119-8886-c49ef2c6f814"><subtitle id="cd-sut" guid="_148c29de-7e0b-4a5e-a980-7c96d668ff45">Water Act 2000</subtitle></coverdata><wrapper><front id="frnt" guid="_8454f695-5439-40ae-ac9b-c98c8cdd9454"><shorttitle id="frnt-st" guid="_535a5512-f131-45a2-bef7-dcb3fbd2582e">Water Resource (Burdekin Basin) Plan 2007</shorttitle></front><body numbering.style="manual"><part id="pt.1" guid="_b9a81835-cb68-4248-940c-baa59923fc15" affected.by.uncommenced="0" numbering.style="manual"><no>Part 1</no><heading id="pt.1-he" guid="_3ba57f3a-2fe4-4a0e-bcce-7e816f432e1d">Preliminary</heading><clause id="sec.1" guid="_ae1a175c-fe5c-4be2-9057-75b070410c54" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>1</no><heading id="sec.1-he" guid="_5debfd8b-1f49-43d3-b686-370c13b2673f">Short title</heading><block><txt break.before="1">This water resource plan may be cited as the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Water Resource (Burdekin Basin) Plan 2007</name></legref>.</txt></block></clause><clause id="sec.2" guid="_9aa52f90-d19a-40d6-a47f-34da1292f043" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>2</no><heading id="sec.2-he" guid="_a955eedd-f94c-4af4-9f9f-cee25f5ee955">Purposes of plan</heading><block><txt break.before="1">The following are the purposes of this plan—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.2-para1.a" guid="_28d67df7-a379-4b90-9843-cbfde9871847" provision.type="other"><no>(a)</no><block><txt break.before="0">to define the availability of water in the plan area;</txt></block></li><li id="sec.2-para1.b" guid="_b23901d2-0cea-48dc-a1f3-28da2e092023" provision.type="other"><no>(b)</no><block><txt break.before="0">to provide a framework for sustainably managing water and the taking of water;</txt></block></li><li id="sec.2-para1.c" guid="_b91814ab-801d-4086-9fef-bcb6af060180" provision.type="other"><no>(c)</no><block><txt break.before="0">to identify priorities and mechanisms for dealing with future water requirements;</txt></block></li><li id="sec.2-para1.d" guid="_3544ab8f-1a8b-4f0a-8ca3-c96d31268d03" provision.type="other"><no>(d)</no><block><txt break.before="0">to provide a framework for establishing water allocations;</txt></block></li><li id="sec.2-para1.e" guid="_af5bc205-4166-4317-9391-6280c9e5ce8b" provision.type="other"><no>(e)</no><block><txt break.before="0">to provide a framework for reversing, where practicable, degradation that has occurred in natural ecosystems;</txt></block></li><li id="sec.2-para1.f" guid="_fd470f63-deae-40f1-abf0-a878ed156890" provision.type="other"><no>(f)</no><block><txt break.before="0">to regulate the taking of overland flow water.</txt></block></li></list></block></clause><clause id="sec.3" guid="_89b262c2-3701-4ede-af5b-20c62004d572" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>3</no><heading id="sec.3-he" guid="_7859bb4c-1c1a-4b95-868c-d42388fe5f9f">Definitions</heading><block><txt break.before="1">The dictionary in <intref refid="sec.28-he" target.guid="_eb19ce39-4289-4bc5-b0f3-609fb4b855c1" check="valid">schedule&#160;10</intref> defines particular words used in this plan.</txt></block></clause></part><part id="pt.2" guid="_11716622-3805-4440-8006-b933bac5dda3" affected.by.uncommenced="0" numbering.style="manual"><no>Part 2</no><heading id="pt.2-he" guid="_19bdca32-90f8-42be-bd60-ba0de8c5d442">Plan area and water to which plan applies</heading><clause id="sec.4" guid="_739d9e03-cf00-4b41-953d-c9329807f043" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>4</no><heading id="sec.4-he" guid="_5b024df7-92eb-4863-9a0c-d0672871ea0f">Plan area</heading><block><txt break.before="1">This plan applies to the area shown as the plan area on the map in <intref refid="sec.28-he" target.guid="_1793060e-0270-499c-9580-309c3f61f941" check="valid">schedule&#160;1</intref>.</txt></block></clause><clause id="sec.5" guid="_0979af88-643c-4559-ad00-9482b3b94b5e" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>5</no><heading id="sec.5-he" guid="_0cc46edb-295c-4205-8730-9ab51a4bd4fa">Subcatchment areas</heading><block><txt break.before="1">Each part of the plan area that is within a subcatchment area shown on the map in <intref refid="sec.28-he" target.guid="_81f8bca2-a7d8-4d0f-ba6f-016d5d3c5a5a" check="valid">schedule&#160;2</intref> is a subcatchment area for this plan.</txt></block></clause><clause id="sec.6" guid="_3e97b1ad-93d6-4f0c-ad26-6db809d6af2d" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>6</no><heading id="sec.6-he" guid="_1b756a56-1152-487f-a8e9-20e6b586e471">Water management areas</heading><block><txt break.before="1">The following subcatchment areas are water management areas with the names stated—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-para1.a" guid="_59664d3f-1902-41bb-888d-b56b7082199e" provision.type="other"><no>(a)</no><block><txt break.before="0">subcatchment area A—Lower Burdekin Water Management Area;</txt></block></li><li id="sec.6-para1.b" guid="_ccfc1740-ed20-468f-82ce-bf701623026e" provision.type="other"><no>(b)</no><block><txt break.before="0">subcatchment area B—Haughton Water Management Area;</txt></block></li><li id="sec.6-para1.c" guid="_007baec9-4491-4ae0-b594-8434cbedcbb6" provision.type="other"><no>(c)</no><block><txt break.before="0">subcatchment area C—Bowen River Water Management Area.</txt></block></li></list></block></clause><clause id="sec.7" guid="_cbdb4cdc-0d8a-4a18-b300-4262a3a0e1df" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>7</no><heading id="sec.7-he" guid="_77ce62ec-ddd3-4645-bbcd-9b396e83b744">Declaration about watercourse—<legref jurisd="QLD" type="act" target.doc.id="UNKNOWN" check="invalid">Act</legref>, <intref check="invalid">s&#160;1006</intref><intref check="invalid">(2)</intref></heading><subclause id="sec.7-ssec.1" guid="_f615f2a2-eab7-43ba-a673-d3e5b5eb223a" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">Water in an aquifer under a watercourse or under land adjacent to a watercourse, in the Giru Benefited Groundwater Area, is declared to be water in the watercourse.</txt></block></subclause><subclause id="sec.7-ssec.2" guid="_ff3eaef8-7c52-45b9-8bbb-40307476cc72" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref refid="sec.28-he" target.guid="_f615f2a2-eab7-43ba-a673-d3e5b5eb223a" check="valid">Subsection&#160;(1)</intref> does not apply to water the chief executive is satisfied is not hydraulically connected to the water in the watercourse.</txt></block></subclause></clause><clause id="sec.8" guid="_898468bc-0fff-42a4-8c49-0b038b68a57f" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>8</no><heading id="sec.8-he" guid="_cd6b37b1-01e7-4c02-ae3c-e96317b51180">Information about areas</heading><subclause id="sec.8-ssec.1" guid="_65ec6ef2-378b-4b0a-92d2-af330a39bd9c" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The exact location of the boundaries of the plan area, subcatchment areas, water management areas and the Giru Benefited Groundwater Area is held in digital electronic form by the department.</txt></block></subclause><subclause id="sec.8-ssec.2" guid="_c2feb835-9356-4ea6-9dd5-1244cf772a15" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The information held in digital electronic form can be reduced or enlarged to show the details of the boundaries.</txt></block></subclause></clause><clause id="sec.9" guid="_c503b309-e58e-4003-826a-0839853568eb" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>9</no><heading id="sec.9-he" guid="_a3ea3708-2905-46a4-995d-f0448230ce99">Nodes</heading><subclause id="sec.9-ssec.1" guid="_d3498b33-9192-46c3-a08a-7efaa2a019b2" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">A node mentioned in this plan is a place on a watercourse in the plan area.</txt></block></subclause><subclause id="sec.9-ssec.2" guid="_6074a287-3dc3-4d67-9471-3afe68c09ff7" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The location of each node is shown on the map in <intref refid="sec.28-he" target.guid="_1793060e-0270-499c-9580-309c3f61f941" check="valid">schedule&#160;1</intref> and described in <intref refid="sec.28-he" target.guid="_222ef798-e220-4426-ae02-8dd2ed95eb76" check="valid">schedule&#160;4</intref>.</txt></block></subclause><subclause id="sec.9-ssec.3" guid="_7805251c-4697-4272-8184-3430599ddd74" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">Each node is identified on the map by a number.</txt></block></subclause></clause><clause id="sec.10" guid="_1afa1d5d-ffd2-4daa-a847-8ce605da26a1" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>10</no><heading id="sec.10-he" guid="_f3e7bf7b-f794-4241-ab7b-6bddabee93e3">Water to which plan applies</heading><block><txt break.before="1">This plan applies to the following water in the plan area—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.10-para1.a" guid="_b7d6cacf-e23d-4c49-927b-ae2cf5a6f5e0" provision.type="other"><no>(a)</no><block><txt break.before="0">water in a watercourse or lake;</txt></block></li><li id="sec.10-para1.b" guid="_a74841e3-7210-4e3b-b464-e77cc7470feb" provision.type="other"><no>(b)</no><block><txt break.before="0">water in springs not connected to—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.10-para1.b-para2.i" guid="_590afee1-4d9c-4ac4-a405-f986f7bbe2e7" provision.type="other"><no>(i)</no><block><txt break.before="0">artesian water; or</txt></block></li><li id="sec.10-para1.b-para2.ii" guid="_38b9ba22-ce6a-4a08-ab99-dccd7aad17cf" provision.type="other"><no>(ii)</no><block><txt break.before="0">subartesian water connected to artesian water;</txt></block></li></list></block></li><li id="sec.10-para1.c" guid="_24ef45fc-eb06-41e9-8924-d0cf4b77f362" provision.type="other"><no>(c)</no><block><txt break.before="0">overland flow water, other than water in springs connected to—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.10-para1.c-para2.i" guid="_f69ceaec-f948-49e3-9c14-fc0f9972912c" provision.type="other"><no>(i)</no><block><txt break.before="0">artesian water; or</txt></block></li><li id="sec.10-para1.c-para2.ii" guid="_f3e2019a-dafc-4238-91c5-57d02130a250" provision.type="other"><no>(ii)</no><block><txt break.before="0">subartesian water connected to artesian water.</txt></block></li></list></block></li></list></block></clause></part><part id="pt.3" guid="_057b0010-889f-43d8-be67-397f5db898cc" affected.by.uncommenced="0" numbering.style="manual"><no>Part 3</no><heading id="pt.3-he" guid="_13057e2b-2d31-4323-8ad3-a30581b22324">Outcomes for sustainable management of water</heading><clause id="sec.11" guid="_deadc529-2a43-4b5e-9fed-f6d429a9587b" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>11</no><heading id="sec.11-he" guid="_99ed6eee-c26d-44d3-8852-5b51bbdc0430">Outcomes for water in plan area</heading><block><txt break.before="1">Water is to be allocated and sustainably managed in a way that—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.11-para1.a" guid="_f62a0af0-60d4-4edf-953a-023eceb994f9" provision.type="other"><no>(a)</no><block><txt break.before="0">recognises the natural state of watercourses, lakes and springs has changed because of water infrastructure, flow supplementation and the taking of water; and</txt></block></li><li id="sec.11-para1.b" guid="_f882cfc0-55ce-478e-b198-92c1f067885d" provision.type="other"><no>(b)</no><block><txt break.before="0">seeks to achieve a balance in the following outcomes—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.11-para1.b-para2.i" guid="_ee0df201-4608-4493-ae1a-8e688ce93889" provision.type="other"><no>(i)</no><block><txt break.before="0">the general outcomes mentioned in <intref refid="sec.28-he" target.guid="_0660a958-b10e-43c6-85e2-6c7a8a6183af" check="valid">section&#160;12</intref>;</txt></block></li><li id="sec.11-para1.b-para2.ii" guid="_9200debc-613c-45d2-952e-1f70aee32b8e" provision.type="other"><no>(ii)</no><block><txt break.before="0">the general ecological outcomes mentioned in <intref refid="sec.28-he" target.guid="_7d9c654b-3dc1-4df2-883f-134f9f8bc95b" check="valid">section&#160;13</intref>;</txt></block></li><li id="sec.11-para1.b-para2.iii" guid="_7b5b947b-5eb6-43e8-bcdf-4ac2dcde3dda" provision.type="other"><no>(iii)</no><block><txt break.before="0">the specific ecological outcomes mentioned in <intref refid="sec.28-he" target.guid="_5857f450-ccf9-4a63-a274-6199e2d34449" check="valid">section&#160;14</intref>.</txt></block></li></list></block></li></list></block></clause><clause id="sec.12" guid="_0660a958-b10e-43c6-85e2-6c7a8a6183af" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>12</no><heading id="sec.12-he" guid="_0720dd7d-9358-4b7c-835e-c9674a2fa3c3">General outcomes</heading><block><txt break.before="1">Each of the following is a general outcome for water in the plan area—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.12-para1.a" guid="_6e68ac62-057c-428d-b5d0-24742fefa201" provision.type="other"><no>(a)</no><block><txt break.before="0">to provide for the use of all water entitlements and other authorisations in the plan area;</txt></block></li><li id="sec.12-para1.b" guid="_fe2f24e0-8120-4cb9-8f7e-60df9daefc32" provision.type="other"><no>(b)</no><block><txt break.before="0">to provide for the continued use of all existing overland flow works;</txt></block></li><li id="sec.12-para1.c" guid="_b38003a1-f700-478a-aaab-dfc9a1527a56" provision.type="other"><no>(c)</no><block><txt break.before="0">to protect the probability of being able to take water under a water allocation;</txt></block></li><li id="sec.12-para1.d" guid="_1548f534-ffb2-4b7a-a9d9-8ad959239792" provision.type="other"><no>(d)</no><block><txt break.before="0">to make water available to support—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.12-para1.d-para2.i" guid="_7ffcdb0f-4a12-4aa2-a66a-e5aab352df59" provision.type="other"><no>(i)</no><block><txt break.before="0">population growth in towns and communities dependent on surface water resources in the plan area; and</txt></block></li><li id="sec.12-para1.d-para2.ii" guid="_30782bb8-fb0f-4f2f-9ded-b8d144b1f9ca" provision.type="other"><no>(ii)</no><block><txt break.before="0">growth in industries dependent on surface water resources in the plan area;</txt></block></li></list></block></li><li id="sec.12-para1.e" guid="_312856ed-48b9-451e-8bfb-3e677cb94886" provision.type="other"><no>(e)</no><block><txt break.before="0">to make water available in the Lower Burdekin and Haughton subcatchments to support—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.12-para1.e-para2.i" guid="_d5d18de9-25e8-4bb3-9cd7-662576a256ea" provision.type="other"><no>(i)</no><block><txt break.before="0">water supplies for Townsville and Thuringowa; and</txt></block></li><li id="sec.12-para1.e-para2.ii" guid="_7abd04eb-5fd3-4b2a-8240-907a03f7b8ff" provision.type="other"><no>(ii)</no><block><txt break.before="0">growth in irrigated agriculture in the Lower Burdekin, Gumlu and Bowen areas; and</txt></block></li><li id="sec.12-para1.e-para2.iii" guid="_c9fb0a76-d8e7-45d4-8ba4-29a23bde540a" provision.type="other"><no>(iii)</no><block><txt break.before="0">water supplies for other urban, industrial and mining uses; and</txt></block></li><li id="sec.12-para1.e-para2.iv" guid="_281a65fb-3c94-4b05-ad33-f50b453bf57b" provision.type="other"><no>(iv)</no><block><txt break.before="0">the natural and artificial recharge of the Lower Burdekin delta groundwater system;</txt></block></li></list></block></li><li id="sec.12-para1.f" guid="_70220c1b-3623-40a5-a4d5-f02f0cd6bcb9" provision.type="other"><no>(f)</no><block><txt break.before="0">to make water available in the Upper Burdekin subcatchment to support—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.12-para1.f-para2.i" guid="_de8395e6-e00e-4164-ba9e-23aa6e464703" provision.type="other"><no>(i)</no><block><txt break.before="0">growth in irrigated agriculture; and</txt></block></li><li id="sec.12-para1.f-para2.ii" guid="_b2afd056-b0e1-4d1a-ac53-decd1a5f7144" provision.type="other"><no>(ii)</no><block><txt break.before="0">water supplies for Charters Towers, Dalrymple Shire and the mining industry;</txt></block></li></list></block></li><li id="sec.12-para1.g" guid="_e1ea1b23-7fd3-4731-ac17-6dd4c693fccf" provision.type="other"><no>(g)</no><block><txt break.before="0">to make water available in the Belyando-Suttor subcatchment to support growth in irrigated agriculture;</txt></block></li><li id="sec.12-para1.h" guid="_72909c0c-e62c-45cc-b53e-99a47ce1e7c2" provision.type="other"><no>(h)</no><block><txt break.before="0">to make water available in the Bowen and Broken subcatchments to support water supplies for urban, industrial, mining and other uses at Collinsville and in neighbouring areas;</txt></block></li><li id="sec.12-para1.i" guid="_77f5941b-f5ea-4af7-99b8-75033cd5d47f" provision.type="other"><no>(i)</no><block><txt break.before="0">to manage access to water to support the ongoing management of the Lower Burdekin delta groundwater system;</txt></block></li><li id="sec.12-para1.j" guid="_d352715b-fe18-426e-9f1b-147d12f63b85" provision.type="other"><no>(j)</no><block><txt break.before="0">to encourage continual improvement in the efficient use of water;</txt></block></li><li id="sec.12-para1.k" guid="_ebab1bfa-faa3-472f-b807-9922b24e8339" provision.type="other"><no>(k)</no><block><txt break.before="0">to support water-related cultural values of Aboriginal and Torres Strait Islander communities in the plan area;</txt></block></li><li id="sec.12-para1.l" guid="_7118e8bd-1131-4bd0-b152-a9a11c1b53af" provision.type="other"><no>(l)</no><block><txt break.before="0">to ensure water is available to support natural ecosystem processes.</txt></block></li></list></block></clause><clause id="sec.13" guid="_7d9c654b-3dc1-4df2-883f-134f9f8bc95b" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>13</no><heading id="sec.13-he" guid="_8b51603d-f984-44d6-a30f-d8967ee23d36">General ecological outcomes</heading><subclause id="sec.13-ssec.1" guid="_78c6b87d-4e14-4723-a233-31970710dee8" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">Each of the following is a general ecological outcome for water in the plan area—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.13-ssec.1-para1.a" guid="_52a9c927-a5e5-4503-827e-8501fb5ea48c" provision.type="other"><no>(a)</no><block><txt break.before="0">to maintain the natural variability of flows that support the habitats of native plants and animals and migratory birds in watercourses, floodplains, wetlands, lakes and springs;</txt></block></li><li id="sec.13-ssec.1-para1.b" guid="_6bc193a1-7790-4ac4-928c-36db01ef8f1e" provision.type="other"><no>(b)</no><block><txt break.before="0">to provide for the continued capability of one part of a river system to be connected to another, including by maintaining flood flows that—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.13-ssec.1-para1.b-para2.i" guid="_bdff7665-4386-4a2e-a0e7-210168a4a66f" provision.type="other"><no>(i)</no><block><txt break.before="0">allow for the movement of native aquatic fauna between riverine, floodplain, wetland, estuarine and marine environments; and</txt></block></li><li id="sec.13-ssec.1-para1.b-para2.ii" guid="_38bcc7ea-7e4d-4153-bac9-8c5eec68fe14" provision.type="other"><no>(ii)</no><block><txt break.before="0">deliver nutrients and organic matter throughout the plan area to support natural processes such as breeding, growth and migration in riverine, floodplain, wetland, estuarine and marine environments; and</txt></block></li><li id="sec.13-ssec.1-para1.b-para2.iii" guid="_ed93f070-bc3f-4d76-a03e-389f16947d47" provision.type="other"><no>(iii)</no><block><txt break.before="0">deliver water and sediments throughout the plan area to support river-forming processes;</txt></block></li></list></block></li><li id="sec.13-ssec.1-para1.c" guid="_88a7ec9a-e384-435a-9705-4c0915a34780" provision.type="other"><no>(c)</no><block><txt break.before="0">to minimise changes to natural variability in water levels and to support natural ecological processes, including maintaining refugia associated with waterholes and lakes particularly in the Belyando-Suttor subcatchment;</txt></block></li><li id="sec.13-ssec.1-para1.d" guid="_f6702fe1-20aa-4e07-bbd1-c81d77f6dbbd" provision.type="other"><no>(d)</no><block><txt break.before="0">to promote improved understanding of the matters affecting the flow-related health of ecosystems in the plan area;</txt></block></li><li id="sec.13-ssec.1-para1.e" guid="_96e6e5de-e0c0-40c3-a5ca-51440e2d908b" provision.type="other"><no>(e)</no><block><txt break.before="0">to maintain flooding in the Lower Burdekin and Haughton subcatchments to provide freshwater inputs to wetlands on the Burdekin Haughton floodplain;</txt></block></li><li id="sec.13-ssec.1-para1.f" guid="_86572e73-cb64-4204-965a-b8ae254f04b3" provision.type="other"><no>(f)</no><block><txt break.before="0">to provide a flow regime that—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.13-ssec.1-para1.f-para2.i" guid="_0caf5c6c-c30e-47fc-8103-25a20c726926" provision.type="other"><no>(i)</no><block><txt break.before="0">maintains delivery of fresh water to the estuaries of watercourses and the Great Barrier Reef Lagoon; and</txt></block></li><li id="sec.13-ssec.1-para1.f-para2.ii" guid="_8ed5bb86-1b5b-40f8-84f7-e9dc9ebbc35d" provision.type="other"><no>(ii)</no><block><txt break.before="0">maintains natural sedimentation processes to support the replenishment of beaches along the Burdekin Haughton floodplain and Cape Bowling Green; and</txt></block></li><li id="sec.13-ssec.1-para1.f-para2.iii" guid="_9ae2a4f4-919d-4636-944d-069d34031c34" provision.type="other"><no>(iii)</no><block><txt break.before="0">supports productivity in the receiving waters of the Great Barrier Reef and inshore reefs.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.13-ssec.2" guid="_1c2bdbdc-04fd-4bea-9458-dd23f619095b" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sec.13-ssec.2-def.refugia_" guid="_aee59dae-942d-46e6-84ee-81395fff3785" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.13-ssec.2-def.refugia" guid="_94311905-5c16-4258-bd0e-ee8d30533ce1" type="definition">refugia</defterm> means the habitat required by a species during a time of stress, including, for example, drought.</txt></definition></deflist></block></subclause></clause><clause id="sec.14" guid="_5857f450-ccf9-4a63-a274-6199e2d34449" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>14</no><heading id="sec.14-he" guid="_e3e581de-d5d6-4218-a71d-61d658937fbe">Specific ecological outcomes</heading><block><txt break.before="1">Each of the following is a specific ecological outcome for water in the plan area—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.14-para1.a" guid="_c8fa343e-a1b9-4eff-b479-7fbf032bdc84" provision.type="other"><no>(a)</no><block><txt break.before="0">to maintain the natural continuity of flow from immediately downstream of the Charters Towers Weir to the upstream limit of the impounded area of the Burdekin Falls Dam;</txt></block></li><li id="sec.14-para1.b" guid="_513bbab8-cec6-4350-96b2-ee897ec596d3" provision.type="other"><no>(b)</no><block><txt break.before="0">to maintain connectivity between Mistake Creek and its adjacent floodplain system during floods;</txt></block></li><li id="sec.14-para1.c" guid="_fd5308c5-a918-4a9a-9815-03dab01dbded" provision.type="other"><no>(c)</no><block><txt break.before="0">to minimise adverse impacts on the morphology of watercourses, waterholes, lakes and springs, used for taking supplemented water, in the Burdekin Haughton Water Supply Scheme;</txt></block></li><li id="sec.14-para1.d" guid="_ad90cb93-354d-47e6-ab5f-b62dd37accc2" provision.type="other"><no>(d)</no><block><txt break.before="0">to ensure there are no further impacts on natural creek flows in the Barratta Creek system;</txt></block></li><li id="sec.14-para1.e" guid="_c299aa8a-ced9-4ab2-937d-b7bb9793c749" provision.type="other"><no>(e)</no><block><txt break.before="0">to provide a flow regime that supports fish passage in the river reaches from the Clare Weir impoundment to the mouth of the Burdekin River;</txt></block></li><li id="sec.14-para1.f" guid="_93bc0408-66f4-48fc-8e23-45381344e51b" provision.type="other"><no>(f)</no><block><txt break.before="0">to provide a flow regime that supports fish passage in the river reaches to the mouth of the Haughton River.</txt></block></li></list></block></clause></part><part id="pt.4" guid="_47f8709d-3e89-43dc-892d-a1d705b1281c" affected.by.uncommenced="0" numbering.style="manual"><no>Part 4</no><heading id="pt.4-he" guid="_41bbb6b6-2248-4dad-be07-98a1d5791a0e">Performance indicators and objectives</heading><division id="pt.4-div.1" guid="_ec8a1e95-99ba-4601-b38f-5b61b9f92584" affected.by.uncommenced="0" numbering.style="manual"><no>Division 1</no><heading id="pt.4-div.1-he" guid="_0196b5bd-c738-4c85-ac6c-c904bcb12e34">Environmental flow objectives</heading><clause id="sec.15" guid="_40e09f3e-6f14-4bb1-8dca-4d54c191f11b" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>15</no><heading id="sec.15-he" guid="_6ee79480-3a75-4b04-bb8c-225ffc0510bf">Performance indicators for environmental flow objectives</heading><block><txt break.before="1">The performance indicators for the environmental flow objectives are—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.15-para1.a" guid="_9b14fe96-f6b2-45f9-b120-828d24a36b98" provision.type="other"><no>(a)</no><block><txt break.before="0">for assessing periods of low flow, the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.15-para1.a-para2.i" guid="_ad1ae8ec-8670-47a1-83bb-e6a46ab0af64" provision.type="other"><no>(i)</no><block><txt break.before="0">50% non-zero daily flow;</txt></block></li><li id="sec.15-para1.a-para2.ii" guid="_c8794873-1d2e-4209-9dc4-2b56e08cac7a" provision.type="other"><no>(ii)</no><block><txt break.before="0">80% non-zero daily flow;</txt></block></li><li id="sec.15-para1.a-para2.iii" guid="_98a98929-a277-4891-8f45-2916530a07b2" provision.type="other"><no>(iii)</no><block><txt break.before="0">daily flow;</txt></block></li><li id="sec.15-para1.a-para2.iv" guid="_23d74126-f6b3-4324-8b18-7b27cd7350b9" provision.type="other"><no>(iv)</no><block><txt break.before="0">period of no flow; and</txt></block></li></list></block></li><li id="sec.15-para1.b" guid="_38bc4cc2-bc93-4d9f-93ce-cc498077ca72" provision.type="other"><no>(b)</no><block><txt break.before="0">for assessing periods of medium to high flow, the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.15-para1.b-para2.i" guid="_7a945ad0-4df3-4409-8506-cb76ee0c8570" provision.type="other"><no>(i)</no><block><txt break.before="0">mean annual flow;</txt></block></li><li id="sec.15-para1.b-para2.ii" guid="_05df25e2-07e3-4652-9742-003c48bb649f" provision.type="other"><no>(ii)</no><block><txt break.before="0">median annual flow;</txt></block></li><li id="sec.15-para1.b-para2.iii" guid="_38a1ad9c-5c8b-4e90-a105-84aea582c179" provision.type="other"><no>(iii)</no><block><txt break.before="0">1.5 year daily flow volume;</txt></block></li><li id="sec.15-para1.b-para2.iv" guid="_99634115-33de-422a-a5d9-77ad013da387" provision.type="other"><no>(iv)</no><block><txt break.before="0">5 year daily flow volume;</txt></block></li><li id="sec.15-para1.b-para2.v" guid="_e1082170-401b-4c40-918c-472708f6d251" provision.type="other"><no>(v)</no><block><txt break.before="0">20 year daily flow volume;</txt></block></li><li id="sec.15-para1.b-para2.vi" guid="_4a3497cf-01a0-4e48-b4c3-9e623fabe2f2" provision.type="other"><no>(vi)</no><block><txt break.before="0">annual proportional flow deviation.</txt></block></li></list></block></li></list></block></clause><clause id="sec.16" guid="_2b8175e5-f871-47a1-9ae5-54a2a95a0318" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>16</no><heading id="sec.16-he" guid="_c749f83d-3b18-4607-a1f9-6305f3d1405f">Environmental flow objectives</heading><block><txt break.before="1">The environmental flow objectives for this plan are stated in <intref refid="sec.28-he" target.guid="_628d66ea-4fad-441f-884e-291ba2eae1e4" check="valid">schedule&#160;5</intref>.</txt></block></clause></division><division id="pt.4-div.2" guid="_1a4d79ee-0083-4710-beb5-3dab9e3f201a" affected.by.uncommenced="0" numbering.style="manual"><no>Division 2</no><heading id="pt.4-div.2-he" guid="_54da4e59-0a84-4a3d-b51f-32c459333d1c">Water allocation security objectives</heading><clause id="sec.17" guid="_7717ff0d-33b2-417b-a702-f1046452120e" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>17</no><heading id="sec.17-he" guid="_cd71a0c8-eb7e-478d-91f8-19d993cc8ab1">Performance indicators for water allocation security objectives</heading><block><txt break.before="1">The performance indicators for the water allocation security objectives are—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.17-para1.a" guid="_2a3cd0dd-b86e-4201-8229-5581b8931a1c" provision.type="other"><no>(a)</no><block><txt break.before="0">for taking supplemented water, the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.17-para1.a-para2.i" guid="_dfeb9d64-8219-413e-bb38-356202e9b25d" provision.type="other"><no>(i)</no><block><txt break.before="0">annual supplemented water sharing index;</txt></block></li><li id="sec.17-para1.a-para2.ii" guid="_d28dbc2c-0131-4038-8c3b-62e37aed0dcd" provision.type="other"><no>(ii)</no><block><txt break.before="0">monthly supplemented water sharing index; and</txt></block></li></list></block></li><li id="sec.17-para1.b" guid="_72fd6098-51a7-47b7-a42b-5b8f376e5a5f" provision.type="other"><no>(b)</no><block><txt break.before="0">for taking unsupplemented water, the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.17-para1.b-para2.i" guid="_c019fd33-250e-4bc4-8540-d68d73d76e94" provision.type="other"><no>(i)</no><block><txt break.before="0">30% unsupplemented water sharing index;</txt></block></li><li id="sec.17-para1.b-para2.ii" guid="_c74686b6-6506-473f-a4ef-acb358926794" provision.type="other"><no>(ii)</no><block><txt break.before="0">50% unsupplemented water sharing index;</txt></block></li><li id="sec.17-para1.b-para2.iii" guid="_2a1965ea-4c96-4ce6-be35-0dd5403eca2b" provision.type="other"><no>(iii)</no><block><txt break.before="0">70% unsupplemented water sharing index;</txt></block></li><li id="sec.17-para1.b-para2.iv" guid="_aa8f78b6-77be-42ca-82d5-3c03ee9ad7c4" provision.type="other"><no>(iv)</no><block><txt break.before="0">annual volume probability.</txt></block></li></list></block></li></list></block></clause><clause id="sec.18" guid="_ed1be544-ae8d-4ff0-8c23-ff4425b24d03" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>18</no><heading id="sec.18-he" guid="_7ad61563-8e1a-4f59-8974-ee2992a726d5">Water allocation security objectives</heading><block><txt break.before="1">The water allocation security objectives for this plan are stated in—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.18-para1.a" guid="_1d9ee64b-123d-4672-96bd-6a19e9674267" provision.type="other"><no>(a)</no><block><txt break.before="0">for water allocations to take supplemented water—<intref refid="sec.28-he" target.guid="_c6efa7c7-492c-497e-95e3-098070fd8c6f" check="valid">schedule&#160;6</intref>, part 1; and</txt></block></li><li id="sec.18-para1.b" guid="_f54557dd-1082-481b-91fd-f9b181206d74" provision.type="other"><no>(b)</no><block><txt break.before="0">for water allocations to take unsupplemented water—<intref refid="sec.28-he" target.guid="_c6efa7c7-492c-497e-95e3-098070fd8c6f" check="valid">schedule&#160;6</intref>, part 2.</txt></block></li></list></block></clause></division></part><part id="pt.5" guid="_44b79419-14ef-4dce-80f7-fed2eaf892f3" affected.by.uncommenced="0" numbering.style="manual"><no>Part 5</no><heading id="pt.5-he" guid="_9461ce04-04f2-4ada-8ce1-2ce9d7bde966">Strategies for achieving outcomes</heading><division id="pt.5-div.1" guid="_b168ccfc-2f48-40b4-8581-88a15efaa7e0" affected.by.uncommenced="0" numbering.style="manual"><no>Division 1</no><heading id="pt.5-div.1-he" guid="_c821b035-1807-4f0d-bada-54b48e2d68aa">Preliminary</heading><clause id="sec.19" guid="_6eedf4e9-f926-4255-a88b-c1624e3c403f" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>19</no><heading id="sec.19-he" guid="_947946b3-c433-4f28-b23e-fed63716a279">Decisions consistent with objectives</heading><block><txt break.before="1">Decisions about the allocation or management of water in the plan area, other than a decision about a water permit, must be consistent with—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.19-para1.a" guid="_83962340-5f65-4422-a87d-2719c04c8efe" provision.type="other"><no>(a)</no><block><txt break.before="0">the environmental flow objectives stated in <intref refid="sec.28-he" target.guid="_628d66ea-4fad-441f-884e-291ba2eae1e4" check="valid">schedule&#160;5</intref>; and</txt></block></li><li id="sec.19-para1.b" guid="_628c7ad4-3a83-408c-a959-1d83ba872874" provision.type="other"><no>(b)</no><block><txt break.before="0">the water allocation security objectives stated in <intref refid="sec.28-he" target.guid="_c6efa7c7-492c-497e-95e3-098070fd8c6f" check="valid">schedule&#160;6</intref>.</txt></block></li></list></block></clause><clause id="sec.20" guid="_52e619e7-d67b-41b2-8f6f-7b89c87d1aff" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>20</no><heading id="sec.20-he" guid="_67b4f4fd-e03f-46c4-9e52-bbe107d54b23">Assessing impact of decisions</heading><subclause id="sec.20-ssec.1" guid="_611cbec2-88dc-4658-9031-a8025bf2d647" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The IQQM computer program’s simulation for the simulation period is used to assess consistency with the objectives.</txt></block></subclause><subclause id="sec.20-ssec.2" guid="_66349096-4a9a-470e-8c61-4c1eab794b12" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">If it is not practicable to use the IQQM computer program, another assessment method approved by the chief executive may be used.</txt></block></subclause><subclause id="sec.20-ssec.3" guid="_438bb30c-76ad-430e-84a8-9113b94f924a" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive may approve an assessment method for <intref refid="sec.28-he" target.guid="_66349096-4a9a-470e-8c61-4c1eab794b12" check="valid">subsection&#160;(2)</intref> only if the chief executive is satisfied the method will assess consistency with the objectives at least as accurately as the IQQM computer program.</txt></block></subclause></clause><clause id="sec.21" guid="_e12afd29-8630-44c9-83d8-66aee8da8c49" status="repealed" affected.by.uncommenced="0" spent.amends="0" provision.type="other" toc="no"><no>21</no><heading id="sec.21-he" guid="_dab64a87-009f-41aa-ab9c-d118a0cb84aa">Measuring devices</heading><repealed><repealedtxt/></repealed><historynote><txt break.before="1"><b><intref refid="sec.28-he" target.guid="_e12afd29-8630-44c9-83d8-66aee8da8c49" check="valid">s&#160;21</intref></b> om <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.39" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;39</legref></txt></historynote></clause><clause id="sec.22" guid="_ace95276-c3f1-45a9-9f42-502d5818b58a" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>22</no><heading id="sec.22-he" guid="_38bec772-c67b-49d3-b275-8a8e8353b7a9">Restrictions on taking water from waterholes or lakes</heading><subclause id="sec.22-ssec.1" guid="_647134d3-7d20-4e79-bd2a-c59655123450" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the chief executive in making a decision about—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.22-ssec.1-para1.a" guid="_04c9323c-0f7c-488d-8780-5ac69ee1bd59" provision.type="other"><no>(a)</no><block><txt break.before="0">a water licence to take unsupplemented water; or</txt></block></li><li id="sec.22-ssec.1-para1.b" guid="_da024dca-d406-431d-8c50-06549e17247f" provision.type="other"><no>(b)</no><block><txt break.before="0">converting an authorisation to take unsupplemented water into a water allocation; or</txt></block></li><li id="sec.22-ssec.1-para1.c" guid="_05071e8e-17cd-4efd-94c0-db155552afc3" provision.type="other"><no>(c)</no><block><txt break.before="0">the management of water under a resource operations licence or a distribution operations licence.</txt></block></li></list></block></subclause><subclause id="sec.22-ssec.2" guid="_7a6c5160-a13e-4828-87de-2026bd40084f" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">If the water licence, water allocation, resource operations licence or distribution operations licence allows the taking of water from a waterhole or lake, the chief executive must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.22-ssec.2-para1.a" guid="_e745240a-ce9a-4728-a5e5-085a49aa0c93" provision.type="other"><no>(a)</no><block><txt break.before="0">consider the impact the taking may have on the cultural or ecological values of the waterhole or lake; and</txt></block></li><li id="sec.22-ssec.2-para1.b" guid="_fc92011a-7749-43eb-ae80-55f52b1eee4a" provision.type="other"><no>(b)</no><block><txt break.before="0">impose a condition on the water licence, water allocation, resource operations licence or distribution operations licence about maintaining the cultural or ecological values of the waterhole or lake.</txt><note id="sec.22-ssec.2-para1.b-note" guid="_d51d8e84-051d-46c0-8296-c8b852f06945" type="example"><heading id="sec.22-ssec.2-para1.b-note-he" guid="_a0bd0b5b-b119-4052-95c0-dc0a69c38e7c">Example for paragraph (b)—</heading><block><txt break.before="1">a condition that the water may be taken only if the water level in the waterhole or lake is above the level that is 0.5m below the level at which it naturally overflows</txt></block></note></block></li></list></block></subclause><subclause id="sec.22-ssec.3" guid="_bed531fb-6b84-4cb6-8b8c-ddc51c1a19d1" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the chief executive need not impose a condition mentioned in <intref refid="sec.28-he" target.guid="_7a6c5160-a13e-4828-87de-2026bd40084f" check="valid">subsection&#160;(2)</intref><intref refid="sec.28-he" target.guid="_fc92011a-7749-43eb-ae80-55f52b1eee4a" check="valid">(b)</intref> if the chief executive is satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.22-ssec.3-para1.a" guid="_d056f66e-77e3-4188-ab63-2d31350e9ba8" provision.type="other"><no>(a)</no><block><txt break.before="0">the taking of water from the waterhole or lake will not adversely affect its cultural or ecological values; or</txt></block></li><li id="sec.22-ssec.3-para1.b" guid="_c160bf02-95e9-4a82-99a1-5ea8c8f454b2" provision.type="other"><no>(b)</no><block><txt break.before="0">for a water licence or water allocation that replaces an authorisation in force immediately before the commencement of this plan—the holder of the authorisation would suffer economic hardship if the condition were imposed.</txt></block></li></list></block></subclause></clause><clause id="sec.23" guid="_902177de-023d-424f-8545-7da1dd4abade" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>23</no><heading id="sec.23-he" guid="_9881cd1f-d683-4c1c-bda8-56ceaa2a4f5b">Matters to be considered for environmental management rules</heading><subclause id="sec.23-ssec.1" guid="_28b375db-7cb2-4678-a3ff-469c6880740b" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">In deciding the environmental management rules to be included in the resource operations plan, the chief executive must consider—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.23-ssec.1-para1.a" guid="_11fb6b42-afed-44d6-b206-324f167236d6" provision.type="other"><no>(a)</no><block><txt break.before="0">the streamflows required to maintain the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.23-ssec.1-para1.a-para2.i" guid="_ff910694-a26e-431d-a1e0-12c97ba5835c" provision.type="other"><no>(i)</no><block><txt break.before="0">the longitudinal connectivity of low flow habitats throughout river systems in the plan area;</txt></block></li><li id="sec.23-ssec.1-para1.a-para2.ii" guid="_fd9d0faf-b701-4385-938a-054784b7be20" provision.type="other"><no>(ii)</no><block><txt break.before="0">the wetted habitats at riffles and other streambed features;</txt></block></li><li id="sec.23-ssec.1-para1.a-para2.iii" guid="_8f72b39f-e570-4fc1-9c5a-883662b11fde" provision.type="other"><no>(iii)</no><block><txt break.before="0">the natural seasonality of flows and zero flows;</txt></block></li><li id="sec.23-ssec.1-para1.a-para2.iv" guid="_5b705bb4-78df-41e6-98b1-1ff2fb2d713b" provision.type="other"><no>(iv)</no><block><txt break.before="0">the replenishment of refuge pools that enable movement of instream biota;</txt></block></li><li id="sec.23-ssec.1-para1.a-para2.v" guid="_6c23b840-c107-4b7b-a6d9-9045d15cacd3" provision.type="other"><no>(v)</no><block><txt break.before="0">the lateral connectivity between rivers in the plan area and their adjacent riverine environments including floodplains; and</txt></block></li></list></block></li><li id="sec.23-ssec.1-para1.b" guid="_f5b81227-ab95-422f-b682-204081cc3e63" provision.type="other"><no>(b)</no><block><txt break.before="0">the impact the taking of, or proposed taking of, or interfering with, water may have on the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.23-ssec.1-para1.b-para2.i" guid="_88af6495-7dbb-4d11-8ba0-0538d5c5ab9f" provision.type="other"><no>(i)</no><block><txt break.before="0">water quality;</txt></block></li><li id="sec.23-ssec.1-para1.b-para2.ii" guid="_8d5a8215-ba95-421b-81b2-8beffe3c668a" provision.type="other"><no>(ii)</no><block><txt break.before="0">the natural movement of sediment;</txt></block></li><li id="sec.23-ssec.1-para1.b-para2.iii" guid="_48dbaec5-02b2-4ad5-8ec3-b00e719a356b" provision.type="other"><no>(iii)</no><block><txt break.before="0">the bed and banks of a watercourse or lake;</txt></block></li><li id="sec.23-ssec.1-para1.b-para2.iv" guid="_20359fe9-b6ce-4539-91bc-fd413c21072b" provision.type="other"><no>(iv)</no><block><txt break.before="0">riparian vegetation;</txt></block></li><li id="sec.23-ssec.1-para1.b-para2.v" guid="_f4a114e7-6b3a-4844-b718-a5f252b7d2c2" provision.type="other"><no>(v)</no><block><txt break.before="0">habitats for native plants and animals;</txt></block></li><li id="sec.23-ssec.1-para1.b-para2.vi" guid="_05432208-88dd-4c9c-b114-99a701febc88" provision.type="other"><no>(vi)</no><block><txt break.before="0">the movement of fish and other aquatic species;</txt></block></li><li id="sec.23-ssec.1-para1.b-para2.vii" guid="_3adefde9-a771-4c80-9f0e-8ef72a8675ea" provision.type="other"><no>(vii)</no><block><txt break.before="0">the recreation and aesthetic values of the plan area;</txt></block></li><li id="sec.23-ssec.1-para1.b-para2.viii" guid="_07de6cdf-5ca4-46d0-a276-befebbc11590" provision.type="other"><no>(viii)</no><block><txt break.before="0">cultural values including, for example, cultural values of local Aboriginal or Torres Strait Islander communities.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.23-ssec.2" guid="_b452341b-a88d-4ab9-9cde-a66eb5377f07" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref refid="sec.28-he" target.guid="_28b375db-7cb2-4678-a3ff-469c6880740b" check="valid">Subsection&#160;(1)</intref> does not limit the matters the chief executive may consider.</txt></block></subclause></clause><clause id="sec.24" guid="_91337c9d-ac0c-4951-a9f2-e5811a8c9c9e" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>24</no><heading id="sec.24-he" guid="_795d976c-749e-4527-80c3-7ae8afb710db">Matters to be considered for water sharing rules</heading><subclause id="sec.24-ssec.1" guid="_23a8d1a5-479c-40eb-a449-3d16de9e46a8" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">In deciding the water sharing rules, to be included in the resource operations plan, for authorisations to take water in a part of the plan area, the chief executive must consider—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.24-ssec.1-para1.a" guid="_6b7cd953-0eef-42a9-bea5-e993f8218bda" provision.type="other"><no>(a)</no><block><txt break.before="0">for rules relating to supplemented water, the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.24-ssec.1-para1.a-para2.i" guid="_33232b81-b5d9-4ad4-85b2-01dad93be2f6" provision.type="other"><no>(i)</no><block><txt break.before="0">any existing water sharing rules;</txt></block></li><li id="sec.24-ssec.1-para1.a-para2.ii" guid="_144e7d9a-b839-40c7-8cc1-c25bfa98a3bd" provision.type="other"><no>(ii)</no><block><txt break.before="0">the extent to which any existing water supply arrangements are linked to the natural occurrence of streamflows;</txt></block></li><li id="sec.24-ssec.1-para1.a-para2.iii" guid="_62f920a9-8f7f-44da-b74c-1b03dfc5fa4f" provision.type="other"><no>(iii)</no><block><txt break.before="0">the frequency, duration, magnitude and timing of limited water availability; and</txt></block></li></list></block></li><li id="sec.24-ssec.1-para1.b" guid="_7d7702e3-241d-4f92-9058-c6135e9477e0" provision.type="other"><no>(b)</no><block><txt break.before="0">for rules relating to unsupplemented water, the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.24-ssec.1-para1.b-para2.i" guid="_f82b23c6-86cc-4ddd-9c6e-42716e99ae98" provision.type="other"><no>(i)</no><block><txt break.before="0">any existing water sharing arrangements;</txt></block></li><li id="sec.24-ssec.1-para1.b-para2.ii" guid="_636671c0-6da1-4c33-9e8d-0d6fb22de284" provision.type="other"><no>(ii)</no><block><txt break.before="0">the local availability of water that may be taken from streamflows, waterholes or bedsands;</txt></block></li><li id="sec.24-ssec.1-para1.b-para2.iii" guid="_14d7ea80-5071-4cc5-98cf-e83837ad0c8a" provision.type="other"><no>(iii)</no><block><txt break.before="0">the conditions for taking water, decided under <intref refid="sec.28-he" target.guid="_279e91e1-96ac-4b14-b4a6-c50a8d08f62b" check="valid">section&#160;68</intref> or <intref refid="sec.28-he" target.guid="_a5a3f8a8-3291-4f0b-abcd-3b4ac9c9d0eb" check="valid">76</intref>;</txt></block></li><li id="sec.24-ssec.1-para1.b-para2.iv" guid="_1e78a65e-dc54-4f90-9889-9fd3265dec78" provision.type="other"><no>(iv)</no><block><txt break.before="0">the daily volumetric limits decided under <intref refid="sec.28-he" target.guid="_b4ec3958-f27e-4f51-bf38-4818a0d453c3" check="valid">section&#160;66</intref> or <intref refid="sec.28-he" target.guid="_aea7cffb-e1f8-4480-bf52-5b909d1f483d" check="valid">74</intref>;</txt></block></li><li id="sec.24-ssec.1-para1.b-para2.v" guid="_f5d1705a-7a84-45f7-a187-565c852dda9d" provision.type="other"><no>(v)</no><block><txt break.before="0">the annual volumetric limits decided under <intref refid="sec.28-he" target.guid="_46ba0fb4-faf5-46b1-b254-978128512055" check="valid">section&#160;67</intref> or <intref refid="sec.28-he" target.guid="_1f6bf91c-298e-4679-9832-c3525ea16e56" check="valid">75</intref>;</txt></block></li><li id="sec.24-ssec.1-para1.b-para2.vi" guid="_4914b4ed-33dd-4440-8d3b-5419bb7e5541" provision.type="other"><no>(vi)</no><block><txt break.before="0">the impact on authorisations to take water in the plan area.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.24-ssec.2" guid="_9ce8c3b9-3cb9-4e8f-8f8a-bd6357dee045" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref refid="sec.28-he" target.guid="_23a8d1a5-479c-40eb-a449-3d16de9e46a8" check="valid">Subsection&#160;(1)</intref> does not limit the matters the chief executive may consider.</txt></block></subclause></clause><clause id="sec.24A" guid="_a39887bf-a5b6-4955-8dc0-88d2c223b62a" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>24A</no><heading id="sec.24A-he" guid="_1f866c3a-af70-45cd-b9bc-356419b62c06">Matters to be considered for infrastructure operating rules</heading><subclause id="sec.24A-ssec.1" guid="_9a9ab3f7-6426-46ce-a673-d9ec6d232345" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">In deciding the infrastructure operating rules to be included in the resource operations plan for water infrastructure or proposed infrastructure, the chief executive must consider—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.24A-ssec.1-para1.a" guid="_36e9d9bc-c194-434e-a97a-f747177b3a81" provision.type="other"><no>(a)</no><block><txt break.before="0">the impact of the infrastructure’s or proposed infrastructure’s operation on the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.24A-ssec.1-para1.a-para2.i" guid="_8dcb0fd3-9332-430e-8645-c8dc33ab2623" provision.type="other"><no>(i)</no><block><txt break.before="0">instream water levels;</txt></block></li><li id="sec.24A-ssec.1-para1.a-para2.ii" guid="_142313cf-1f8a-436f-ba4a-3e5abdef7563" provision.type="other"><no>(ii)</no><block><txt break.before="0">beds and banks of watercourses;</txt></block></li><li id="sec.24A-ssec.1-para1.a-para2.iii" guid="_06875882-1267-48d5-8fa4-902895d3ed48" provision.type="other"><no>(iii)</no><block><txt break.before="0">riparian vegetation; and</txt></block></li></list></block></li><li id="sec.24A-ssec.1-para1.b" guid="_3c7c7ccd-71c4-41f4-bce9-c8e0123aa032" provision.type="other"><no>(b)</no><block><txt break.before="0">the extent to which artificial variations in instream water levels and flows may adversely affect natural ecosystems; and</txt></block></li><li id="sec.24A-ssec.1-para1.c" guid="_60ffc5ad-bca1-4a48-86d4-d6287e35dd5c" provision.type="other"><no>(c)</no><block><txt break.before="0">the impact of the transfer of water between watercourses; and</txt></block></li><li id="sec.24A-ssec.1-para1.d" guid="_e2788eb8-f9b8-4be9-ba1f-3058f592eceb" provision.type="other"><no>(d)</no><block><txt break.before="0">the likelihood of fish deaths caused by the operation of the infrastructure; and</txt></block></li><li id="sec.24A-ssec.1-para1.e" guid="_55b554f7-f0e7-4157-ad29-d77599413e78" provision.type="other"><no>(e)</no><block><txt break.before="0">the matters mentioned in <intref refid="sec.28-he" target.guid="_902177de-023d-424f-8545-7da1dd4abade" check="valid">section&#160;23</intref><intref refid="sec.28-he" target.guid="_28b375db-7cb2-4678-a3ff-469c6880740b" check="valid">(1)</intref><intref refid="sec.28-he" target.guid="_11fb6b42-afed-44d6-b206-324f167236d6" check="valid">(a)</intref> and <intref refid="sec.28-he" target.guid="_f5b81227-ab95-422f-b682-204081cc3e63" check="valid">(b)</intref>.</txt></block></li></list></block></subclause><subclause id="sec.24A-ssec.2" guid="_523e381a-6605-451f-878c-2328e76caff8" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref refid="sec.28-he" target.guid="_9a9ab3f7-6426-46ce-a673-d9ec6d232345" check="valid">Subsection&#160;(1)</intref> does not limit the matters the chief executive may consider.</txt></block></subclause><historynote><txt break.before="1"><b><intref refid="sec.28-he" target.guid="_a39887bf-a5b6-4955-8dc0-88d2c223b62a" check="valid">s&#160;24A</intref></b> ins <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.40" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;40</legref></txt></historynote></clause><clause id="sec.25" guid="_c9864157-909e-4ebd-aa98-9b80f790076e" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>25</no><heading id="sec.25-he" guid="_82b2d856-6a7f-4f3d-a23a-9f424464fb4a">Matters to be considered for water allocation change rules</heading><subclause id="sec.25-ssec.1" guid="_408ab422-9ec3-4547-987c-d91b3407e74e" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">In deciding the water allocation change rules, to be included in the resource operations plan, for authorisations to take water in a part of the plan area, the chief executive must consider—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.25-ssec.1-para1.a" guid="_f23e37cd-c269-4180-8615-30db8e21558a" provision.type="other"><no>(a)</no><block><txt break.before="0">the ongoing management of the Lower Burdekin delta groundwater system; and</txt></block></li><li id="sec.25-ssec.1-para1.b" guid="_81c8a5aa-1b3b-4b7b-af6d-f92c737c045b" provision.type="other"><no>(b)</no><block><txt break.before="0">the implications, for the availability of water under water allocations, of changes to the frequency, duration, magnitude and timing of limited water availability.</txt></block></li></list></block></subclause><subclause id="sec.25-ssec.2" guid="_5c1386ee-8c8a-4146-ac5d-371eeccac8f1" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref refid="sec.28-he" target.guid="_408ab422-9ec3-4547-987c-d91b3407e74e" check="valid">Subsection&#160;(1)</intref> does not limit the matters the chief executive may consider.</txt></block></subclause></clause><clause id="sec.26" guid="_38d093da-358a-42ee-9732-6199a461f0de" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>26</no><heading id="sec.26-he" guid="_aa96663c-3f7a-484c-9eeb-c57846c08d5b">Accepting and deciding particular applications to interfere with water</heading><subclause id="sec.26-ssec.1" guid="_62de6347-d2e7-43d8-8afb-85414ef0ac38" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the chief executive in making a decision about an application to interfere with, or increase the interference with, water in a watercourse, waterhole, lake or spring by impounding the flow of the water.</txt></block></subclause><subclause id="sec.26-ssec.2" guid="_d75b9979-5a82-4be1-b6af-058523eb2945" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may accept and decide the application if the purpose of the proposed interference or increase in interference is only—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.26-ssec.2-para1.a" guid="_33c98c42-b4f1-4952-9ce8-f8e647d02da6" provision.type="other"><no>(a)</no><block><txt break.before="0">to store water for stock or domestic purposes; or</txt></block></li><li id="sec.26-ssec.2-para1.b" guid="_34aea0b3-c6e3-4a8a-a982-fe2c2ed3e868" provision.type="other"><no>(b)</no><block><txt break.before="0">to provide a pumping pool to enable water to be taken under an existing authorisation; or</txt></block></li><li id="sec.26-ssec.2-para1.c" guid="_d4a50d4d-76bd-40f8-8b34-4d87bfd8a857" provision.type="other"><no>(c)</no><block><txt break.before="0">to store water for a purpose not related to the taking of water under a water entitlement.</txt><note id="sec.26-ssec.2-para1.c-note" guid="_503b64ed-77f1-44c3-87a3-33f6a8267ba1" type="example"><heading id="sec.26-ssec.2-para1.c-note-he" guid="_19522626-57bf-4b61-b6ce-b23b1db43272">Examples of a purpose for <intref refid="sec.28-he" target.guid="_d75b9979-5a82-4be1-b6af-058523eb2945" check="valid">subsection&#160;(2)</intref><intref refid="sec.28-he" target.guid="_d4a50d4d-76bd-40f8-8b34-4d87bfd8a857" check="valid">(c)</intref>—</heading><block><txt break.before="1">community landscaping or retaining water for flood mitigation purposes</txt></block></note></block></li></list></block></subclause><subclause id="sec.26-ssec.3" guid="_0e27def8-1ab0-4dbe-994a-511cb325bdce" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive may approve the application if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.26-ssec.3-para1.a" guid="_a2c9b7bf-f414-4264-92e6-e154e6d8def4" provision.type="other"><no>(a)</no><block><txt break.before="0">the chief executive is satisfied the proposed interference or increase in interference is necessary for a purpose mentioned in <intref refid="sec.28-he" target.guid="_d75b9979-5a82-4be1-b6af-058523eb2945" check="valid">subsection&#160;(2)</intref>; and</txt></block></li><li id="sec.26-ssec.3-para1.b" guid="_bd157a78-b283-426a-b487-9978b7fca4b7" provision.type="other"><no>(b)</no><block><txt break.before="0">the proposed storage capacity is no greater than is necessary for the purpose of the proposed interference or increase in interference having regard to—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.26-ssec.3-para1.b-para2.i" guid="_6d347ee6-3601-4f4a-9de5-e5d13693eb38" provision.type="other"><no>(i)</no><block><txt break.before="0">the impact the proposed interference or increase in interference may have on the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.26-ssec.3-para1.b-para2.i-para3.A" guid="_e1f59267-9853-441c-95c0-9aacfcee4e67" provision.type="other"><no>(A)</no><block><txt break.before="0">instream water levels;</txt></block></li><li id="sec.26-ssec.3-para1.b-para2.i-para3.B" guid="_7a8aa0e7-f346-4742-81fe-873bce71bbf6" provision.type="other"><no>(B)</no><block><txt break.before="0">the natural movement of sediment;</txt></block></li><li id="sec.26-ssec.3-para1.b-para2.i-para3.C" guid="_3c2726a1-8b9c-401c-b892-2ce5dc99f3d5" provision.type="other"><no>(C)</no><block><txt break.before="0">the bed and banks of the watercourse or lake;</txt></block></li><li id="sec.26-ssec.3-para1.b-para2.i-para3.D" guid="_6333bfb5-101c-4832-bdd2-05df2b6de95c" provision.type="other"><no>(D)</no><block><txt break.before="0">riparian vegetation;</txt></block></li><li id="sec.26-ssec.3-para1.b-para2.i-para3.E" guid="_4cc44e65-a15c-42cd-ace3-3053cf1ab747" provision.type="other"><no>(E)</no><block><txt break.before="0">habitats for native plants and animals;</txt></block></li><li id="sec.26-ssec.3-para1.b-para2.i-para3.F" guid="_77a3e1bb-bbe3-4623-b145-7bce9a60d775" provision.type="other"><no>(F)</no><block><txt break.before="0">the movement of fish and other aquatic species;</txt></block></li><li id="sec.26-ssec.3-para1.b-para2.i-para3.G" guid="_5058fe17-d54b-44dc-bf10-7d550bb99559" provision.type="other"><no>(G)</no><block><txt break.before="0">the cultural and ecological values of watercourses, waterholes, lakes or springs; and</txt></block></li></list></block></li><li id="sec.26-ssec.3-para1.b-para2.ii" guid="_a040149a-2bd5-4bf0-9582-b8241d0b27ee" provision.type="other"><no>(ii)</no><block><txt break.before="0">for a purpose mentioned in <intref refid="sec.28-he" target.guid="_d75b9979-5a82-4be1-b6af-058523eb2945" check="valid">subsection&#160;(2)</intref><intref refid="sec.28-he" target.guid="_33c98c42-b4f1-4952-9ce8-f8e647d02da6" check="valid">(a)</intref>—existing water supplies on the property to which the application relates, including existing weirs, groundwater and dams taking overland flow water and the availability of water at the proposed site.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.26-ssec.4" guid="_d83714f3-36d4-4a46-a47f-4dcf56158c7a" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">However, the chief executive must not approve an application for a purpose mentioned in <intref refid="sec.28-he" target.guid="_d75b9979-5a82-4be1-b6af-058523eb2945" check="valid">subsection&#160;(2)</intref><intref refid="sec.28-he" target.guid="_34aea0b3-c6e3-4a8a-a982-fe2c2ed3e868" check="valid">(b)</intref> or <intref refid="sec.28-he" target.guid="_d4a50d4d-76bd-40f8-8b34-4d87bfd8a857" check="valid">(c)</intref> if the proposed storage capacity is greater than—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.26-ssec.4-para1.a" guid="_7a35476e-07fc-4046-a808-17c46fbf1846" provision.type="other"><no>(a)</no><block><txt break.before="0">for an application for a purpose mentioned in <intref refid="sec.28-he" target.guid="_d75b9979-5a82-4be1-b6af-058523eb2945" check="valid">subsection&#160;(2)</intref><intref refid="sec.28-he" target.guid="_34aea0b3-c6e3-4a8a-a982-fe2c2ed3e868" check="valid">(b)</intref>—10ML; or</txt></block></li><li id="sec.26-ssec.4-para1.b" guid="_da14cf5c-6754-4942-9ce3-bf86a10527b2" provision.type="other"><no>(b)</no><block><txt break.before="0">for an application for a purpose mentioned in <intref refid="sec.28-he" target.guid="_d75b9979-5a82-4be1-b6af-058523eb2945" check="valid">subsection&#160;(2)</intref><intref refid="sec.28-he" target.guid="_d4a50d4d-76bd-40f8-8b34-4d87bfd8a857" check="valid">(c)</intref>—250ML.</txt></block></li></list></block></subclause><subclause id="sec.26-ssec.5" guid="_f334cbb2-42a5-4c9b-a765-b6de46c3aad8" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">This section does not apply to an application about unallocated water.</txt></block></subclause><subclause id="sec.26-ssec.6" guid="_9b141994-49d3-4c69-8e6b-1c2a77803a89" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sec.26-ssec.6-def.pumpingpool_" guid="_7e7297f4-db9f-4aa7-98c4-1a1816bd319e" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.26-ssec.6-def.pumpingpool" guid="_b3064715-c70c-4a1b-a33a-b13d583e9dee" type="definition">pumping pool</defterm> means a pool of water near a pump in a watercourse, lake or spring that ensures the water level of the watercourse, lake or spring is appropriate to enable the pump to function properly.</txt></definition></deflist></block></subclause></clause></division><division id="pt.5-div.2" guid="_47784151-e158-49cd-83f6-e3174e6f11f6" affected.by.uncommenced="0" numbering.style="manual"><no>Division 2</no><heading id="pt.5-div.2-he" guid="_d71af329-0110-41fb-835c-6c1305cabf6c">Unallocated water</heading><subdivision id="pt.5-div.2-sdiv.1" guid="_39111c80-c295-47cd-b24f-d5c7779e275f" status="repealed" affected.by.uncommenced="0" toc="no"><no>Subdivision 1</no><heading id="pt.5-div.2-sdiv.1-he" guid="_25308842-3786-4a0a-ba33-44fea45879b8">Continued moratorium and interim arrangements</heading><historynote><txt break.before="1"><b>sdiv 1 hdg </b>om <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.41" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;41</legref></txt></historynote><clause id="sec.27" guid="_9b2ed682-fc32-4b47-8ccb-cd11b1d9cede" status="repealed" affected.by.uncommenced="0" spent.amends="0" provision.type="other" toc="no"><no>27</no><heading id="sec.27-he" guid="_ed52a277-f53b-4084-9325-96d4f3596250"/><repealed><repealedtxt/></repealed><historynote><txt break.before="1"><b><intref refid="sec.28-he" target.guid="_9f6c4575-36ae-4089-9b6b-75fcf81e4440" check="valid">s&#160;27</intref></b> om <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.42" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;41</legref></txt></historynote></clause><clause id="sec.28" guid="_f245d322-5611-425d-a512-becc8ee01773" status="repealed" affected.by.uncommenced="0" spent.amends="0" provision.type="other" toc="no"><no>28</no><heading id="sec.28-he" guid="_bdec5f9f-aaf3-4223-bbe2-5700547b079c"/><repealed><repealedtxt/></repealed><historynote><txt break.before="1"><b><intref refid="sec.28-he" target.guid="_9f6c4575-36ae-4089-9b6b-75fcf81e4440" check="valid">s&#160;27</intref></b> om <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.42" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;41</legref></txt></historynote></clause></subdivision><subdivision id="pt.5-div.2-sdiv.2" guid="_0d93da34-1e0f-4082-b4e3-a69e9cbb2ff8" affected.by.uncommenced="0" numbering.style="manual"><no>Subdivision 2</no><heading id="pt.5-div.2-sdiv.2-he" guid="_086bd916-8dfc-436f-ad11-96a3779c35c5">General, strategic and SunWater reserves</heading><clause id="sec.29" guid="_9f6c4575-36ae-4089-9b6b-75fcf81e4440" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>29</no><heading id="sec.29-he" guid="_206128e3-7e0b-4677-b679-5238cbb8469a">Unallocated water held as general, strategic or SunWater reserve</heading><block><txt break.before="1">Unallocated water is held as a general, strategic or SunWater reserve and dealt with under this division.</txt></block><historynote><txt break.before="1"><b><intref refid="sec.28-he" target.guid="_9f6c4575-36ae-4089-9b6b-75fcf81e4440" check="valid">s&#160;29</intref></b> amd <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.42" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;42</legref></txt></historynote></clause><clause id="sec.30" guid="_8f95c0a2-0491-4994-a905-09977055ec73" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>30</no><heading id="sec.30-he" guid="_a5f345bb-a15b-4950-9ed6-0cd3b9a8b455">Establishing general reserve, strategic reserve and Sunwater reserve</heading><block><txt break.before="1">The resource operations plan must establish—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.30-para1.a" guid="_642d450b-603f-45c7-853a-a9fb026b9fcd" provision.type="other"><no>(a)</no><block><txt break.before="0">a general reserve; and</txt></block></li><li id="sec.30-para1.b" guid="_8683dfbb-b3bd-4f58-b60a-88822990682a" provision.type="other"><no>(b)</no><block><txt break.before="0">a strategic reserve that must include—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.30-para1.b-para2.i" guid="_01f51961-7344-45a6-bb46-4746feda4dcb" provision.type="other"><no>(i)</no><block><txt break.before="0">a volume of water for a future raising of the Burdekin Falls Dam of not more than 2m; and</txt></block></li><li id="sec.30-para1.b-para2.ii" guid="_91f49257-8c37-4ef8-8ffd-e5bcbb8ec4c4" provision.type="other"><no>(ii)</no><block><txt break.before="0">a volume of water, for water infrastructure for the Bowen and Broken subcatchments, that is primarily intended for industrial use; and</txt></block></li></list></block></li><li id="sec.30-para1.c" guid="_6fbec8ba-8944-4e63-b889-b1f20706e131" provision.type="other"><no>(c)</no><block><txt break.before="0">a SunWater reserve of water with a nominal volume of 8744ML (the <defterm id="sec.30-def.SunWaterreserve" guid="_748dc04c-720b-4302-a14b-258cb9e2a59b" type="definition">SunWater reserve</defterm>).</txt></block></li></list></block><historynote><txt break.before="1"><b><intref refid="sec.28-he" target.guid="_8f95c0a2-0491-4994-a905-09977055ec73" check="valid">s&#160;30</intref></b> amd <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.43" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;43</legref></txt></historynote></clause></subdivision><subdivision id="pt.5-div.2-sdiv.3" guid="_d10291f7-8b55-4d76-b507-dda4d56f1ca7" affected.by.uncommenced="0" numbering.style="manual"><no>Subdivision 3</no><heading id="pt.5-div.2-sdiv.3-he" guid="_062e0dae-5fea-47db-b8b1-485b4d20d23f">Dealing with unallocated water under the resource operations plan</heading><clause id="sec.31" guid="_852e2b4c-67b3-4e4b-b748-21313e0159c6" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>31</no><heading id="sec.31-he" guid="_c57a54f8-96bd-4a28-9d84-4eac6091ce9c">Granting unallocated water</heading><block><txt break.before="1">Unallocated water may be granted from the general, strategic or SunWater reserve under a process in the resource operations plan.</txt></block></clause><clause id="sec.32" guid="_c0382961-08c0-43bf-a982-77e85f361a09" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>32</no><heading id="sec.32-he" guid="_d803c0ae-06c2-4ef5-8d55-d3981ffe74a5">Preparing and implementing process under the resource operations plan generally</heading><subclause id="sec.32-ssec.1" guid="_f970f0ae-fa33-4619-be35-f62b495e5c5e" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">Unallocated water may be dealt with under a process in the resource operations plan.</txt></block></subclause><subclause id="sec.32-ssec.2" guid="_a574cb07-d85b-49f8-ba5d-ff8f2d6f3afc" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">In preparing and implementing the process, the chief executive must consider the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.32-ssec.2-para1.a" guid="_cd1b2c46-8a32-45da-866f-0401fa534734" provision.type="other"><no>(a)</no><block><txt break.before="0">the purpose for which the water is required;</txt></block></li><li id="sec.32-ssec.2-para1.b" guid="_647797fd-6530-43e8-8495-6463801804ab" provision.type="other"><no>(b)</no><block><txt break.before="0">the efficiency of existing and proposed water use practices;</txt></block></li><li id="sec.32-ssec.2-para1.c" guid="_a051d952-9904-4c55-8e08-3a005227899d" provision.type="other"><no>(c)</no><block><txt break.before="0">the extent to which water is being taken under existing authorisations in the plan area;</txt></block></li><li id="sec.32-ssec.2-para1.d" guid="_2473aa29-ebca-40ce-bd81-07a07ab0e78d" provision.type="other"><no>(d)</no><block><txt break.before="0">the availability of an alternative water supply for the purpose for which the water is required;</txt></block></li><li id="sec.32-ssec.2-para1.e" guid="_9f04df0d-437a-4bfc-8c5f-61554c960858" provision.type="other"><no>(e)</no><block><txt break.before="0">the impact the proposed taking of, or interfering with, the water may have on existing water users in the plan area;</txt></block></li><li id="sec.32-ssec.2-para1.f" guid="_9b6589a2-e305-44c1-88ff-9acfa1c35af6" provision.type="other"><no>(f)</no><block><txt break.before="0">whether the proposed taking or interfering is likely to have a direct adverse effect on groundwater flows;</txt></block></li><li id="sec.32-ssec.2-para1.g" guid="_0cb3364d-a59c-432e-a685-d5ce95f3eb0b" provision.type="other"><no>(g)</no><block><txt break.before="0">the matters mentioned in <intref refid="sec.28-he" target.guid="_902177de-023d-424f-8545-7da1dd4abade" check="valid">section&#160;23</intref><intref refid="sec.28-he" target.guid="_28b375db-7cb2-4678-a3ff-469c6880740b" check="valid">(1)</intref><intref refid="sec.28-he" target.guid="_11fb6b42-afed-44d6-b206-324f167236d6" check="valid">(a)</intref> and <intref refid="sec.28-he" target.guid="_f5b81227-ab95-422f-b682-204081cc3e63" check="valid">(b)</intref>.</txt></block></li></list></block></subclause><subclause id="sec.32-ssec.3" guid="_2310ec48-6b93-40f0-b53b-5fa8761dddad" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The resource operations plan must state that use, for irrigation, of water taken under a water licence granted under the process requires a land and water management plan approved under <legref jurisd="QLD" type="act" refid="sec.77" target.doc.id="UNKNOWN" check="invalid">section&#160;77</legref> of the <legref jurisd="QLD" type="act" target.doc.id="UNKNOWN" check="invalid">Act</legref>.</txt></block></subclause><subclause id="sec.32-ssec.4" guid="_0e325ad6-cc5b-40f3-9a13-7bd3ac20fadc" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0"><intref refid="sec.28-he" target.guid="_a574cb07-d85b-49f8-ba5d-ff8f2d6f3afc" check="valid">Subsection&#160;(2)</intref> does not limit the matters the chief executive may consider.</txt></block></subclause></clause><clause id="sec.33" guid="_59ffdfb8-3d01-41d6-9bc7-f0b1f5c984f2" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>33</no><heading id="sec.33-he" guid="_23a6ab1d-4b94-4198-9f68-0f92af26a637">Dealing with SunWater reserve under the resource operations plan</heading><block><txt break.before="1">The SunWater reserve may be granted as a water allocation to SunWater under a process in the resource operations plan if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.33-para1.a" guid="_f7598f02-c725-4b26-9610-98b3e3735116" provision.type="other"><no>(a)</no><block><txt break.before="0">SunWater makes a submission to the chief executive requesting the release of all or part of the SunWater reserve; and</txt></block></li><li id="sec.33-para1.b" guid="_1358ce43-b7ec-4dce-b4d6-7f4f084ae0c4" provision.type="other"><no>(b)</no><block><txt break.before="0">the submission deals, to the satisfaction of the chief executive, with—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.33-para1.b-para2.i" guid="_4ab7571a-4af5-4b7f-947e-a5d1eafb97bf" provision.type="other"><no>(i)</no><block><txt break.before="0">the matters the chief executive must consider under <intref refid="sec.28-he" target.guid="_c0382961-08c0-43bf-a982-77e85f361a09" check="valid">section&#160;32</intref><intref refid="sec.28-he" target.guid="_a574cb07-d85b-49f8-ba5d-ff8f2d6f3afc" check="valid">(2)</intref>; and</txt></block></li><li id="sec.33-para1.b-para2.ii" guid="_df860c6c-6907-4863-a2c0-3cc301f1ef40" provision.type="other"><no>(ii)</no><block><txt break.before="0">any other matters the chief executive requires SunWater to deal with in the submission; and</txt></block></li></list></block></li><li id="sec.33-para1.c" guid="_8a648b92-ba27-48e7-95e1-420fa1aa723d" provision.type="other"><no>(c)</no><block><txt break.before="0">the granting is consistent with—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.33-para1.c-para2.i" guid="_ae2eeb94-5cdf-4983-9576-0334efce3660" provision.type="other"><no>(i)</no><block><txt break.before="0">the environmental flow objectives for this plan; and</txt></block></li><li id="sec.33-para1.c-para2.ii" guid="_1877b47b-4b0f-460e-a012-028959badaa0" provision.type="other"><no>(ii)</no><block><txt break.before="0">the water allocation security objectives for this plan—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.33-para1.c-para2.ii-para3.A" guid="_ec17ab5b-fbca-403b-a4e5-6ae21354742a" provision.type="other"><no>(A)</no><block><txt break.before="0">generally; and</txt></block></li><li id="sec.33-para1.c-para2.ii-para3.B" guid="_9540edf1-8fe6-49f1-b35e-eea8d4403d5a" provision.type="other"><no>(B)</no><block><txt break.before="0">in particular, for the priority group to which the water allocation will belong; and</txt></block></li></list></block></li><li id="sec.33-para1.c-para2.iii" guid="_49e490f9-9c3b-489a-bc65-ef5c58191197" provision.type="other"><no>(iii)</no><block><txt break.before="0">the general and strategic reserves mentioned in <intref refid="sec.28-he" target.guid="_8f95c0a2-0491-4994-a905-09977055ec73" check="valid">section&#160;30</intref>.</txt></block></li></list></block></li></list></block></clause></subdivision></division><division id="pt.5-div.3" guid="_f9887ae4-a9e0-45c7-a145-308908b7b35e" affected.by.uncommenced="0" numbering.style="manual"><no>Division 3</no><heading id="pt.5-div.3-he" guid="_e7b8ca3a-efc3-4c8f-ad9f-3c7cd8c0bc74">Process for granting and amending interim resource operations licence</heading><subdivision id="pt.5-div.3-sdiv.1" guid="_b7bee672-04bd-44fa-b478-19fee9403a59" affected.by.uncommenced="0" numbering.style="manual"><no>Subdivision 1</no><heading id="pt.5-div.3-sdiv.1-he" guid="_130896b9-b5ee-4750-99d2-744cdc277d65">Preliminary</heading><clause id="sec.34" guid="_5b8099f8-297e-4503-a4d3-898a620bbde6" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>34</no><heading id="sec.34-he" guid="_6fb621f3-6a09-4bdd-bccd-6b42a6772c75">Process for Act, ss 176 and 184A</heading><subclause id="sec.34-ssec.1" guid="_e2378ece-714b-42c7-b14f-56a257724bae" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This division—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.34-ssec.1-para1.a" guid="_dc2e98de-9227-40b3-8bf0-2102d8013046" provision.type="other"><no>(a)</no><block><txt break.before="0">states a process for granting or amending an interim resource operations licence to meet future water requirements; and</txt></block></li><li id="sec.34-ssec.1-para1.b" guid="_cd840fdb-c4ca-48a5-b32f-d97bd363d775" provision.type="other"><no>(b)</no><block><txt break.before="0">applies only to the granting or amendment of an interim resource operations licence for a project declared under the <legref jurisd="QLD" type="act" target.doc.id="act-1971-055" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" check="valid"><name emphasis="yes">State Development and Public Works Organisation Act 1971</name></legref>, <legref jurisd="QLD" type="act" refid="sec.26" target.doc.id="act-1971-055" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" check="invalid">section&#160;26</legref>, to be a significant project.</txt></block></li></list></block></subclause><subclause id="sec.34-ssec.2" guid="_4be55cce-3ca2-473c-b030-5570042b38d3" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">This division applies only until it is replaced by a process stated in the resource operations plan.</txt></block></subclause></clause></subdivision><subdivision id="pt.5-div.3-sdiv.2" guid="_deedf429-1a0b-4369-9621-ae5c57ca4c2a" affected.by.uncommenced="0" numbering.style="manual"><no>Subdivision 2</no><heading id="pt.5-div.3-sdiv.2-he" guid="_bd7abda5-c14b-4a44-aa98-6186e0bbb917">Interim resource operations licence for particular infrastructure</heading><clause id="sec.35" guid="_51c08260-e025-4d1e-9ba9-75a644c2387f" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>35</no><heading id="sec.35-he" guid="_f47b0140-54f9-40a5-b11b-abf71b2b9014">Applying for, or to amend, interim resource operations licence</heading><subclause id="sec.35-ssec.1" guid="_5bdc93aa-37d9-4b16-85de-55cf99806afa" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the proposed owner of infrastructure for a project declared under the <legref jurisd="QLD" type="act" target.doc.id="act-1971-055" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" check="valid"><name emphasis="yes">State Development and Public Works Organisation Act 1971</name></legref>, <legref jurisd="QLD" type="act" refid="sec.26" target.doc.id="act-1971-055" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" check="invalid">section&#160;26</legref>, to be a significant project.</txt></block></subclause><subclause id="sec.35-ssec.2" guid="_d45b7b97-1569-4798-9374-e225e2e5aa60" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may give notice to the proposed owner that the proposed owner must apply to the chief executive for—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.35-ssec.2-para1.a" guid="_c637ecb5-12f3-4007-9cb2-5c05c6b43056" provision.type="other"><no>(a)</no><block><txt break.before="0">an interim resource operations licence to operate the infrastructure; or</txt></block></li><li id="sec.35-ssec.2-para1.b" guid="_d8b702c6-a4f4-45f6-ac45-e66021340ad5" provision.type="other"><no>(b)</no><block><txt break.before="0">an amendment of an interim resource operations licence, already held by the proposed owner, to operate the infrastructure.</txt></block></li></list></block></subclause><subclause id="sec.35-ssec.3" guid="_b208b8ab-3a03-4d08-bb2d-8399c818ffc5" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The application must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.35-ssec.3-para1.a" guid="_f2d26815-0639-415a-a47f-02467e96c911" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li id="sec.35-ssec.3-para1.b" guid="_98e3db4b-8968-418f-8f59-730de01f0b8d" provision.type="other"><no>(b)</no><block><txt break.before="0">include the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.35-ssec.3-para1.b-para2.i" guid="_6a48f7b6-ffaf-4946-bb0a-49dfade24f12" provision.type="other"><no>(i)</no><block><txt break.before="0">details of the proposed infrastructure;</txt></block></li><li id="sec.35-ssec.3-para1.b-para2.ii" guid="_68f1926a-007a-48e5-b9cb-c1b40014d35d" provision.type="other"><no>(ii)</no><block><txt break.before="0">an assessment of the impact of constructing the infrastructure on—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.35-ssec.3-para1.b-para2.ii-para3.A" guid="_c648b16a-8cca-40c6-9297-ef09e4dc74b7" provision.type="other"><no>(A)</no><block><txt break.before="0">the supply of water managed under the interim resource operations licences for the water supply schemes; and</txt></block></li><li id="sec.35-ssec.3-para1.b-para2.ii-para3.B" guid="_14890787-8b80-46a6-81b2-93f474305932" provision.type="other"><no>(B)</no><block><txt break.before="0">existing water entitlements to take unsupplemented water from the areas of the water supply schemes; and</txt></block></li><li id="sec.35-ssec.3-para1.b-para2.ii-para3.C" guid="_206a0799-0b76-4d77-8327-ee9551e7142e" provision.type="other"><no>(C)</no><block><txt break.before="0">the operating arrangements and supply arrangements under the interim resource operations licences for the water supply schemes; and</txt></block></li><li id="sec.35-ssec.3-para1.b-para2.ii-para3.D" guid="_d42d1035-23ec-49d6-85e3-207773c2b5c1" provision.type="other"><no>(D)</no><block><txt break.before="0">other existing authorisations, other than water permits, that may be affected by the proposed infrastructure;</txt></block></li></list></block></li><li id="sec.35-ssec.3-para1.b-para2.iii" guid="_f9842ad5-a1b0-4328-985d-8fe09e606fac" provision.type="other"><no>(iii)</no><block><txt break.before="0">the applicant’s proposal for minimising the impact assessed and mentioned in subparagraph (ii);</txt></block></li><li id="sec.35-ssec.3-para1.b-para2.iv" guid="_968d6f6d-0df4-4509-b79c-1cfcefd5b940" provision.type="other"><no>(iv)</no><block><txt break.before="0">proposed operating arrangements for the infrastructure;</txt></block></li><li id="sec.35-ssec.3-para1.b-para2.v" guid="_f8aa16f2-fd61-4bbe-9b36-db7cfa071359" provision.type="other"><no>(v)</no><block><txt break.before="0">the entities to whom the applicant proposes to supply water;</txt></block></li><li id="sec.35-ssec.3-para1.b-para2.vi" guid="_98558a4b-5209-4e51-b7f6-0c7239fa9f12" provision.type="other"><no>(vi)</no><block><txt break.before="0">the applicant’s proposal about the total interim water allocation to be managed under the proposed interim resource operations licence or proposed amended interim resource operations licence;</txt></block></li><li id="sec.35-ssec.3-para1.b-para2.vii" guid="_ce15cdaa-335d-4bcd-bb97-fd77864e1032" provision.type="other"><no>(vii)</no><block><txt break.before="0">any other information the applicant considers will help the chief executive to decide the application; and</txt></block></li></list></block></li><li id="sec.35-ssec.3-para1.c" guid="_653f537f-f563-4ff3-abc7-8534a23f4bd0" provision.type="other"><no>(c)</no><block><txt break.before="0">be accompanied by the fee prescribed under a regulation.</txt></block></li></list></block></subclause><subclause id="sec.35-ssec.4" guid="_73327482-c4cc-42f2-8d5d-9fb01589e826" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive may give a copy of the application to any entity the chief executive considers appropriate.</txt></block></subclause><subclause id="sec.35-ssec.5" guid="_e617cac6-016c-4685-a966-aa0fc13e2294" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sec.35-ssec.5-def.watersupplyschemes_" guid="_a3fa9ee2-66b2-4110-b59c-bd70ebc608e4" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.35-ssec.5-def.watersupplyschemes" guid="_49e45f5d-fd45-4bf0-a83e-658cdbe30d1d" type="definition">water supply schemes</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.35-ssec.5-def.watersupplyschemes-para1.a" guid="_5979f857-a213-40ff-b84f-463a7fd1fa15" provision.type="other"><no>(a)</no><block><txt break.before="0">the Burdekin Haughton Water Supply Scheme; and</txt></block></li><li id="sec.35-ssec.5-def.watersupplyschemes-para1.b" guid="_28fbf5f4-eb4f-42cf-8b45-44689c2589c9" provision.type="other"><no>(b)</no><block><txt break.before="0">the Bowen Broken Water Supply Scheme.</txt></block></li></list></definition></deflist></block></subclause></clause><clause id="sec.36" guid="_a5848e59-5d44-4059-a696-d2905f9ec94a" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>36</no><heading id="sec.36-he" guid="_804deeca-9fce-436f-b549-fa607cfb4998">Additional information may be required</heading><subclause id="sec.36-ssec.1" guid="_4ef950d6-b529-40f1-828a-f6fb8ed5969d" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may, by notice, require—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.36-ssec.1-para1.a" guid="_2607c664-23ea-4b65-8090-a7b22e92c5c5" provision.type="other"><no>(a)</no><block><txt break.before="0">the applicant to give additional information about the application; or</txt></block></li><li id="sec.36-ssec.1-para1.b" guid="_9e1d9b0c-792e-444c-8411-b05b5e508e6e" provision.type="other"><no>(b)</no><block><txt break.before="0">any information included in the application, or any additional information required under paragraph (a), to be verified by statutory declaration.</txt></block></li></list></block></subclause><subclause id="sec.36-ssec.2" guid="_456b70b5-e49d-4766-a28f-f780434f524b" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">If the applicant does not comply with the requirement within the reasonable time stated in the notice, the application lapses.</txt></block></subclause></clause><clause id="sec.37" guid="_2981bda8-3e4a-425f-823d-f5171bd879b7" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>37</no><heading id="sec.37-he" guid="_f8b712e6-956e-470e-a6e0-1fd629cdb546">Matters chief executive must consider</heading><subclause id="sec.37-ssec.1" guid="_22203967-a8ad-4429-93d1-65c1a7307bcf" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">For deciding the application, the chief executive must consider—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.37-ssec.1-para1.a" guid="_01707451-1960-48d7-bf9e-ac89918c93d8" provision.type="other"><no>(a)</no><block><txt break.before="0">the application and any additional information given about the application; and</txt></block></li><li id="sec.37-ssec.1-para1.b" guid="_5b2d6d67-a5be-4909-b58c-fa7615b30826" provision.type="other"><no>(b)</no><block><txt break.before="0">the public interest.</txt></block></li></list></block></subclause><subclause id="sec.37-ssec.2" guid="_8438c883-84d9-4fa3-8a99-dfc39d5ad9fe" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref refid="sec.28-he" target.guid="_22203967-a8ad-4429-93d1-65c1a7307bcf" check="valid">Subsection&#160;(1)</intref> does not limit the matters the chief executive may consider.</txt></block></subclause></clause><clause id="sec.38" guid="_b08f31f7-c43e-4eeb-bff0-4ef7ac48bcbc" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>38</no><heading id="sec.38-he" guid="_2fc9daf6-0045-44f1-910c-5a72d7eb9bfd">Deciding application for, or to amend, interim resource operations licence</heading><subclause id="sec.38-ssec.1" guid="_ca371911-a898-4ee6-b038-1d346221f933" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">If the chief executive is satisfied the application should be approved, or approved in part, the chief executive must approve all or part of the application, with or without conditions.</txt></block></subclause><subclause id="sec.38-ssec.2" guid="_168d6c74-cae1-49d5-83f4-3390872a7bda" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">If the chief executive grants or amends the interim resource operations licence, the chief executive must reserve, from the strategic reserve, unallocated water required for any proposed interim water allocations to which the approval applies.</txt></block></subclause></clause></subdivision><subdivision id="pt.5-div.3-sdiv.3" guid="_a3017a57-7861-4721-9552-5be7dcd4a1c1" affected.by.uncommenced="0" numbering.style="manual"><no>Subdivision 3</no><heading id="pt.5-div.3-sdiv.3-he" guid="_eba83230-2212-40b8-9ae1-fb6979f0e550">Amendment by chief executive</heading><clause id="sec.39" guid="_c3cf9635-8b22-4957-8229-fa5b718dc3e7" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>39</no><heading id="sec.39-he" guid="_8fea6ed2-631d-4dce-a14f-9ffdcf327296">Amending interim resource operations licence by chief executive—<legref jurisd="QLD" type="act" target.doc.id="UNKNOWN" check="invalid">Act</legref>, <intref check="invalid">s&#160;184A</intref></heading><subclause id="sec.39-ssec.1" guid="_6199897d-5dce-48f4-abfe-2deb30046a75" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may, at any time—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.39-ssec.1-para1.a" guid="_e9aeaac2-bcfa-4d12-8ebd-cac376c71bb2" provision.type="other"><no>(a)</no><block><txt break.before="0">amend an interim resource operations licence, granted or amended under <intref refid="sec.28-he" target.guid="_b08f31f7-c43e-4eeb-bff0-4ef7ac48bcbc" check="valid">section&#160;38</intref>, to the extent the chief executive considers necessary to meet future water requirements; or</txt></block></li><li id="sec.39-ssec.1-para1.b" guid="_af35a452-34fd-4932-89d6-247768adc980" provision.type="other"><no>(b)</no><block><txt break.before="0">amend any other interim resource operations licence, to the extent the chief executive considers necessary as a consequence of—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.39-ssec.1-para1.b-para2.i" guid="_055edfc4-12c4-4951-9dd8-d8299b8bd77f" provision.type="other"><no>(i)</no><block><txt break.before="0">the granting or amendment of an interim resource operations licence under <intref refid="sec.28-he" target.guid="_b08f31f7-c43e-4eeb-bff0-4ef7ac48bcbc" check="valid">section&#160;38</intref>; or</txt></block></li><li id="sec.39-ssec.1-para1.b-para2.ii" guid="_c2b9d5af-fe24-4c6b-b581-e0349eaca707" provision.type="other"><no>(ii)</no><block><txt break.before="0">the amendment of an interim resource operations licence under <intref refid="sec.28-he" target.guid="_58e6c7d1-58d4-4f2f-b83a-738366538dea" check="valid">section&#160;45</intref>.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.39-ssec.2" guid="_c80f404e-d9e4-439c-a71c-a8989cd7ec8b" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">Before the chief executive acts under <intref refid="sec.28-he" target.guid="_6199897d-5dce-48f4-abfe-2deb30046a75" check="valid">subsection&#160;(1)</intref>, the chief executive must give the interim resource operations licence holder notice of the proposed amendment.</txt></block></subclause><subclause id="sec.39-ssec.3" guid="_67fe28cf-bf57-46e9-8b6a-23a89566fa6d" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The notice must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.39-ssec.3-para1.a" guid="_13835a4f-97c9-47d9-9d2a-3aabe1ca2b21" provision.type="other"><no>(a)</no><block><txt break.before="0">state the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.39-ssec.3-para1.a-para2.i" guid="_3b29f555-3b1f-4276-b24b-e38d707eef95" provision.type="other"><no>(i)</no><block><txt break.before="0">a summary of the proposed amendment;</txt></block></li><li id="sec.39-ssec.3-para1.a-para2.ii" guid="_ba155180-76ab-425f-b095-f6b32c195e07" provision.type="other"><no>(ii)</no><block><txt break.before="0">the reasons for the proposed amendment;</txt></block></li><li id="sec.39-ssec.3-para1.a-para2.iii" guid="_877c6122-4908-4715-88a6-000ebafa5e8b" provision.type="other"><no>(iii)</no><block><txt break.before="0">that written submissions may be made by the holder about the proposed amendment;</txt></block></li><li id="sec.39-ssec.3-para1.a-para2.iv" guid="_0e11a936-afc7-4568-ae75-750e5e33878c" provision.type="other"><no>(iv)</no><block><txt break.before="0">the day by which, the person to whom, and the place where, the submissions must be made; and</txt></block></li></list></block></li><li id="sec.39-ssec.3-para1.b" guid="_302d1617-ddfa-4e55-ac18-3de0b3e81a5b" provision.type="other"><no>(b)</no><block><txt break.before="0">include a copy of the proposed amendment.</txt></block></li></list></block></subclause><subclause id="sec.39-ssec.4" guid="_e40bca03-c330-45ce-bbff-7535c1ef7993" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">The day stated must be at least 30 business days after the day the notice is given.</txt></block></subclause></clause><clause id="sec.40" guid="_e490b0af-59f8-4c86-b740-a3c4a237f594" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>40</no><heading id="sec.40-he" guid="_3a21c68c-9568-4412-81f0-c06a7b9a1128">Matters chief executive must consider</heading><subclause id="sec.40-ssec.1" guid="_bc3627bd-bdf1-4d3f-b2ad-337a6307af22" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">In deciding whether to amend an interim resource operations licence, the chief executive must consider—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.40-ssec.1-para1.a" guid="_f5c9ac48-1ac6-464d-9502-9e1dafdcfb69" provision.type="other"><no>(a)</no><block><txt break.before="0">the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.40-ssec.1-para1.a-para2.i" guid="_853bb107-a66d-44c3-8e20-95dff364cb91" provision.type="other"><no>(i)</no><block><txt break.before="0">for an amendment mentioned in <intref refid="sec.28-he" target.guid="_c3cf9635-8b22-4957-8229-fa5b718dc3e7" check="valid">section&#160;39</intref><intref refid="sec.28-he" target.guid="_6199897d-5dce-48f4-abfe-2deb30046a75" check="valid">(1)</intref><intref refid="sec.28-he" target.guid="_e9aeaac2-bcfa-4d12-8ebd-cac376c71bb2" check="valid">(a)</intref>—the original application under <intref refid="sec.28-he" target.guid="_51c08260-e025-4d1e-9ba9-75a644c2387f" check="valid">section&#160;35</intref> for, or to amend, the licence and any additional information given about the application;</txt></block></li><li id="sec.40-ssec.1-para1.a-para2.ii" guid="_f7be4a71-8dcb-4d9e-8aef-fb894f7bee09" provision.type="other"><no>(ii)</no><block><txt break.before="0">for an amendment mentioned in <intref refid="sec.28-he" target.guid="_c3cf9635-8b22-4957-8229-fa5b718dc3e7" check="valid">section&#160;39</intref><intref refid="sec.28-he" target.guid="_6199897d-5dce-48f4-abfe-2deb30046a75" check="valid">(1)</intref><intref refid="sec.28-he" target.guid="_af35a452-34fd-4932-89d6-247768adc980" check="valid">(b)</intref><intref refid="sec.28-he" target.guid="_055edfc4-12c4-4951-9dd8-d8299b8bd77f" check="valid">(i)</intref> as a consequence of the granting or amendment of an interim resource operations licence under <intref refid="sec.28-he" target.guid="_b08f31f7-c43e-4eeb-bff0-4ef7ac48bcbc" check="valid">section&#160;38</intref>—the original application under <intref refid="sec.28-he" target.guid="_51c08260-e025-4d1e-9ba9-75a644c2387f" check="valid">section&#160;35</intref> for the granting or amendment and any additional information given about the application;</txt></block></li><li id="sec.40-ssec.1-para1.a-para2.iii" guid="_d8fe38e3-2bae-40fd-b31b-ed6e7392b0ee" provision.type="other"><no>(iii)</no><block><txt break.before="0">for an amendment mentioned in <intref refid="sec.28-he" target.guid="_c3cf9635-8b22-4957-8229-fa5b718dc3e7" check="valid">section&#160;39</intref><intref refid="sec.28-he" target.guid="_6199897d-5dce-48f4-abfe-2deb30046a75" check="valid">(1)</intref><intref refid="sec.28-he" target.guid="_af35a452-34fd-4932-89d6-247768adc980" check="valid">(b)</intref><intref refid="sec.28-he" target.guid="_c2b9d5af-fe24-4c6b-b581-e0349eaca707" check="valid">(ii)</intref> as a consequence of the amendment of an interim resource operations licence under <intref refid="sec.28-he" target.guid="_58e6c7d1-58d4-4f2f-b83a-738366538dea" check="valid">section&#160;45</intref>—the original application under <intref refid="sec.28-he" target.guid="_90873c15-4763-4b24-8700-8db85484bbcc" check="valid">section&#160;42</intref> for the amendment and any additional information given about the application; and</txt></block></li></list></block></li><li id="sec.40-ssec.1-para1.b" guid="_560583dd-b9d3-4ac0-abfc-76eaf586cd55" provision.type="other"><no>(b)</no><block><txt break.before="0">any submissions made by the interim resource operations licence holder about the proposed amendment; and</txt></block></li><li id="sec.40-ssec.1-para1.c" guid="_da40177b-4a0f-462b-992e-ea3bf92d335e" provision.type="other"><no>(c)</no><block><txt break.before="0">the public interest.</txt></block></li></list></block></subclause><subclause id="sec.40-ssec.2" guid="_5535ddc8-55ca-421a-9ee5-4c6a826d738c" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref refid="sec.28-he" target.guid="_bc3627bd-bdf1-4d3f-b2ad-337a6307af22" check="valid">Subsection&#160;(1)</intref> does not limit the matters the chief executive may consider.</txt></block></subclause></clause><clause id="sec.41" guid="_46025193-1bd8-4b94-8acb-8a116e366c24" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>41</no><heading id="sec.41-he" guid="_daba66b8-44e5-4082-b409-335576982292">Deciding whether to amend interim resource operations licence</heading><block><txt break.before="1">After considering the matters mentioned in <intref refid="sec.28-he" target.guid="_e490b0af-59f8-4c86-b740-a3c4a237f594" check="valid">section&#160;40</intref> and any other matters the chief executive considers appropriate, the chief executive may amend the interim resource operations licence to the extent the chief executive considers appropriate.</txt></block></clause></subdivision><subdivision id="pt.5-div.3-sdiv.4" guid="_60dd3552-0c99-4efa-aa10-6db33e734f40" affected.by.uncommenced="0" numbering.style="manual"><no>Subdivision 4</no><heading id="pt.5-div.3-sdiv.4-he" guid="_f1e9fc66-74e1-4298-9b69-894c462b4e7b">Amendment on application by holder</heading><clause id="sec.42" guid="_90873c15-4763-4b24-8700-8db85484bbcc" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>42</no><heading id="sec.42-he" guid="_65baed29-daa8-4171-af7a-29c57f854831">Amending interim resource operations licence on application by holder—<legref jurisd="QLD" type="act" target.doc.id="UNKNOWN" check="invalid">Act</legref>, <intref check="invalid">s&#160;184A</intref></heading><subclause id="sec.42-ssec.1" guid="_3affcd3d-c219-4797-8073-9dcbe669d246" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The holder of an interim resource operations licence, granted or amended under <intref refid="sec.28-he" target.guid="_b08f31f7-c43e-4eeb-bff0-4ef7ac48bcbc" check="valid">section&#160;38</intref>, may apply to the chief executive to amend the licence.</txt></block></subclause><subclause id="sec.42-ssec.2" guid="_bf52ebec-5f7b-461e-b035-d9d2b2246cf2" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The application must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.42-ssec.2-para1.a" guid="_1f22f459-bd37-4549-a6e8-791993f0e256" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li id="sec.42-ssec.2-para1.b" guid="_035ed866-9f54-45aa-84fb-1fd458070083" provision.type="other"><no>(b)</no><block><txt break.before="0">include a summary of the amendment required and the reasons for the amendment; and</txt></block></li><li id="sec.42-ssec.2-para1.c" guid="_6be66d1e-e449-4c1c-8106-bd15dc73d33b" provision.type="other"><no>(c)</no><block><txt break.before="0">be accompanied by the fee prescribed under a regulation.</txt></block></li></list></block></subclause><subclause id="sec.42-ssec.3" guid="_d038b188-66b9-49da-bb80-840cfcb4a114" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive may give a copy of the application to any entity the chief executive considers appropriate.</txt></block></subclause></clause><clause id="sec.43" guid="_4b4219ea-7819-4dc8-9378-55606ff2567d" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>43</no><heading id="sec.43-he" guid="_42691eb2-3ef9-4768-a341-9a3913ad31d9">Additional information may be required</heading><subclause id="sec.43-ssec.1" guid="_0a7e99e3-c28e-4349-b929-c961d83a7fec" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may, by notice, require—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.43-ssec.1-para1.a" guid="_096d812e-5cbc-43bd-a4e2-81dc453dd024" provision.type="other"><no>(a)</no><block><txt break.before="0">the applicant to give additional information about the application; or</txt></block></li><li id="sec.43-ssec.1-para1.b" guid="_319b1ec4-c14e-4e42-a1d5-a030ac34a23f" provision.type="other"><no>(b)</no><block><txt break.before="0">any information included in the application, or any additional information required under paragraph (a), to be verified by statutory declaration.</txt></block></li></list></block></subclause><subclause id="sec.43-ssec.2" guid="_2515c302-0f66-4c32-8657-5f737f43d484" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">If the applicant does not comply with the requirement within the reasonable time stated in the notice, the application lapses.</txt></block></subclause></clause><clause id="sec.44" guid="_b4c610a9-a56e-44f1-8305-5a8870654602" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>44</no><heading id="sec.44-he" guid="_6061eecf-e851-4368-a0cc-8d3651ddf7ff">Matters chief executive must consider</heading><subclause id="sec.44-ssec.1" guid="_106fb2b7-f83b-4dba-bde4-a7691d7f9914" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">In deciding the application, the chief executive must consider—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.44-ssec.1-para1.a" guid="_f10c365d-6b19-4044-b77f-69ae42431154" provision.type="other"><no>(a)</no><block><txt break.before="0">the application and any additional information given about the application; and</txt></block></li><li id="sec.44-ssec.1-para1.b" guid="_9177ad0d-525d-4190-9da0-da06f5a1be8a" provision.type="other"><no>(b)</no><block><txt break.before="0">the public interest.</txt></block></li></list></block></subclause><subclause id="sec.44-ssec.2" guid="_96fbc1c9-f511-48b4-9be0-c1cae4409f52" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref refid="sec.28-he" target.guid="_106fb2b7-f83b-4dba-bde4-a7691d7f9914" check="valid">Subsection&#160;(1)</intref> does not limit the matters the chief executive may consider.</txt></block></subclause></clause><clause id="sec.45" guid="_58e6c7d1-58d4-4f2f-b83a-738366538dea" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>45</no><heading id="sec.45-he" guid="_29335871-ec18-42b6-9f56-7da4f260472b">Deciding application to amend interim resource operations licence</heading><block><txt break.before="1">If the chief executive is satisfied the application should be approved, or approved in part, the chief executive must approve all or part of the application, with or without conditions.</txt></block></clause></subdivision><subdivision id="pt.5-div.3-sdiv.5" guid="_fc89242c-3d0a-4396-aadb-114e2334d913" affected.by.uncommenced="0" numbering.style="manual"><no>Subdivision 5</no><heading id="pt.5-div.3-sdiv.5-he" guid="_882a6b16-541a-4ff5-8905-ee051fbfb9df">Granting interim water allocations</heading><clause id="sec.46" guid="_0272da0c-24d8-4d80-9884-942f19bf3436" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>46</no><heading id="sec.46-he" guid="_331df99d-fbfe-4738-b344-e7ef735e30cd">Granting interim water allocations—<legref jurisd="QLD" type="act" target.doc.id="UNKNOWN" check="invalid">Act</legref>, <intref check="invalid">s&#160;189</intref></heading><subclause id="sec.46-ssec.1" guid="_721b7726-fd2c-4498-9204-c62c350f5b5a" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, at the time an interim resource operations licence is amended under <intref refid="sec.28-he" target.guid="_b08f31f7-c43e-4eeb-bff0-4ef7ac48bcbc" check="valid">section&#160;38</intref>, <intref refid="sec.28-he" target.guid="_46025193-1bd8-4b94-8acb-8a116e366c24" check="valid">41</intref> or <intref refid="sec.28-he" target.guid="_58e6c7d1-58d4-4f2f-b83a-738366538dea" check="valid">45</intref>, the chief executive is satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.46-ssec.1-para1.a" guid="_8e20dc84-1806-4d1b-8eb7-987e0403c5d5" provision.type="other"><no>(a)</no><block><txt break.before="0">construction of the infrastructure to which the interim resource operations licence relates is substantially complete and the infrastructure may be regarded as operational; and</txt></block></li><li id="sec.46-ssec.1-para1.b" guid="_d358519b-ae23-4079-96b1-b9cefb0b1d8b" provision.type="other"><no>(b)</no><block><txt break.before="0">the operation of the infrastructure is, or will be, consistent with the objectives of this plan; and</txt></block></li><li id="sec.46-ssec.1-para1.c" guid="_0b1731f5-fba4-449c-bba2-87fbdb9cfc95" provision.type="other"><no>(c)</no><block><txt break.before="0">the interim resource operations licence holder has complied with the conditions of the licence in relation to the infrastructure.</txt></block></li></list></block></subclause><subclause id="sec.46-ssec.2" guid="_bdb28522-6558-4435-a008-9632706ec89b" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may require the interim resource operations licence holder to give the chief executive the following information—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.46-ssec.2-para1.a" guid="_236acb20-d367-4f5b-b7ed-746fe41bb39c" provision.type="other"><no>(a)</no><block><txt break.before="0">the number of interim water allocations to which the interim resource operations licence is to relate;</txt></block></li><li id="sec.46-ssec.2-para1.b" guid="_9605af3c-5eee-4eb7-887f-c6ca6c40a929" provision.type="other"><no>(b)</no><block><txt break.before="0">the volume of water that may be taken under each allocation;</txt></block></li><li id="sec.46-ssec.2-para1.c" guid="_c162aaf6-5fdb-4b2c-a5ee-ed9fb17a6374" provision.type="other"><no>(c)</no><block><txt break.before="0">the purpose for which the water may be taken;</txt></block></li><li id="sec.46-ssec.2-para1.d" guid="_fa3dd62b-ff38-4dcf-8f01-164cd0a6452a" provision.type="other"><no>(d)</no><block><txt break.before="0">the priority group to which each allocation is to belong;</txt></block></li><li id="sec.46-ssec.2-para1.e" guid="_eb3f24e8-537d-42c3-9e8e-0a73993b4ff2" provision.type="other"><no>(e)</no><block><txt break.before="0">the water sharing rules that are to apply.</txt></block></li></list></block></subclause><subclause id="sec.46-ssec.3" guid="_04d85bc3-96ac-4f15-b34f-d7494bd37d12" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">After considering the information mentioned in <intref refid="sec.28-he" target.guid="_bdb28522-6558-4435-a008-9632706ec89b" check="valid">subsection&#160;(2)</intref>, the chief executive may grant the interim water allocations to which the interim resource operations licence relates.</txt></block></subclause><subclause id="sec.46-ssec.4" guid="_d9aae9ef-4678-4a51-b3db-7fda8cd3face" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">This section does not apply to the amendment of another interim resource operations licence under <intref refid="sec.28-he" target.guid="_46025193-1bd8-4b94-8acb-8a116e366c24" check="valid">section&#160;41</intref> as a consequence of—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.46-ssec.4-para1.a" guid="_f143ed2f-a70e-4e46-8826-ee86c40a3ddd" provision.type="other"><no>(a)</no><block><txt break.before="0">the granting or amendment of an interim resource operations licence under <intref refid="sec.28-he" target.guid="_b08f31f7-c43e-4eeb-bff0-4ef7ac48bcbc" check="valid">section&#160;38</intref>; or</txt></block></li><li id="sec.46-ssec.4-para1.b" guid="_33e125e1-7d94-4e88-9f2c-463032008594" provision.type="other"><no>(b)</no><block><txt break.before="0">the amendment of an interim resource operations licence under <intref refid="sec.28-he" target.guid="_58e6c7d1-58d4-4f2f-b83a-738366538dea" check="valid">section&#160;45</intref>.</txt></block></li></list></block></subclause></clause></subdivision></division><division id="pt.5-div.4" guid="_c29c998b-dc07-4fbc-ac88-3137b15eca33" status="repealed" affected.by.uncommenced="0" toc="no"><no>Division 4</no><heading id="pt.5-div.4-he" guid="_bf4746e3-1f8a-4f35-aa11-7b996aa33160">Resource operations licences and distribution operations licences</heading><historynote><txt break.before="1"><b>div 4 (ss 47–50)</b> om <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.44" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;44</legref></txt></historynote><clause id="sec.47" guid="_0e586c4f-cc7a-4a69-93a2-1d63be501330" status="repealed" affected.by.uncommenced="0" spent.amends="0" provision.type="other" toc="no"><no>47</no><repealed><repealedtxt/></repealed><historynote><txt break.before="1"><b>div 4 (ss 47–50)</b> om <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.44" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;44</legref></txt></historynote></clause><clause id="sec.48" guid="_5c5addfe-ca32-4d61-83cd-b9c1d8f3f2ab" status="repealed" affected.by.uncommenced="0" spent.amends="0" provision.type="other" toc="no"><no>48</no><repealed><repealedtxt/></repealed><historynote><txt break.before="1"><b>div 4 (ss 47–50)</b> om <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.44" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;44</legref></txt></historynote></clause><clause id="sec.49" guid="_c7d39ade-fa82-42e1-8366-24bb0992f8c9" status="repealed" affected.by.uncommenced="0" spent.amends="0" provision.type="other" toc="no"><no>49</no><repealed><repealedtxt/></repealed><historynote><txt break.before="1"><b>div 4 (ss 47–50)</b> om <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.44" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;44</legref></txt></historynote></clause><clause id="sec.50" guid="_2b3d5072-c910-4f8c-b881-6327573bf0e5" status="repealed" affected.by.uncommenced="0" spent.amends="0" provision.type="other" toc="no"><no>50</no><repealed><repealedtxt/></repealed><historynote><txt break.before="1"><b>div 4 (ss 47–50)</b> om <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.44" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;44</legref></txt></historynote></clause></division><division id="pt.5-div.5" guid="_5df19661-a8c5-45cf-9f17-a85a53bc841a" status="repealed" affected.by.uncommenced="0" toc="no"><no>Division 5</no><heading id="pt.5-div.5-he" guid="_6c2ddaff-121e-4fea-9d64-dc77c7f5fb96">Granting water entitlements</heading><historynote><txt break.before="1"><b>div 5 (ss 51–53)</b> om <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.44" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;44</legref></txt></historynote><clause id="sec.51" guid="_1654f93c-5f20-4d69-8267-ce69508a7324" status="repealed" affected.by.uncommenced="0" spent.amends="0" provision.type="other" toc="no"><no>51</no><repealed><repealedtxt/></repealed><historynote><txt break.before="1"><b>div 5 (ss 51–53)</b> om <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.44" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;44</legref></txt></historynote></clause><clause id="sec.52" guid="_b57e5dde-3bc8-4ab5-b39d-61802adeaf68" status="repealed" affected.by.uncommenced="0" spent.amends="0" provision.type="other" toc="no"><no>52</no><repealed><repealedtxt/></repealed><historynote><txt break.before="1"><b>div 5 (ss 51–53)</b> om <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.44" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;44</legref></txt></historynote></clause><clause id="sec.53" guid="_0b5d8fab-2363-4533-8f26-61a82264ec50" status="repealed" affected.by.uncommenced="0" spent.amends="0" provision.type="other" toc="no"><no>53</no><repealed><repealedtxt/></repealed><historynote><txt break.before="1"><b>div 5 (ss 51–53)</b> om <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.44" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;44</legref></txt></historynote></clause></division><division id="pt.5-div.6" guid="_5c99d5c1-7ec6-4409-b07e-c5d70a42be2f" affected.by.uncommenced="0" numbering.style="manual"><no>Division 6</no><heading id="pt.5-div.6-he" guid="_24280510-ac3b-4ce3-af17-856ec4878bfe">Converting authorisations to water allocations</heading><subdivision id="pt.5-div.6-sdiv.1" guid="_ea106823-333d-4e69-b243-116189bfcba7" affected.by.uncommenced="0" numbering.style="manual"><no>Subdivision 1</no><heading id="pt.5-div.6-sdiv.1-he" guid="_e52c990f-d3e6-4091-94da-07793e41c7b5">Preliminary</heading><clause id="sec.54" guid="_213eae0c-5205-4558-a6d1-168390ada19e" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>54</no><heading id="sec.54-he" guid="_351ea88e-f1c1-488f-80ec-cbc375868014">Application of div 6</heading><block><txt break.before="1">This division applies only to—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.54-para1.a" guid="_e759eeb7-9931-4fb0-9fbc-4fb1399403cf" provision.type="other"><no>(a)</no><block><txt break.before="0">authorisations converted, under the resource operations plan, to water allocations; and</txt></block></li><li id="sec.54-para1.b" guid="_c0436a24-f0da-4164-9cc0-8fb3a702d104" provision.type="other"><no>(b)</no><block><txt break.before="0">water allocations converted, under the resource operations plan, from authorisations.</txt></block></li></list></block></clause><clause id="sec.55" guid="_ee5203a8-2810-4487-a741-50c3b4eb1b85" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>55</no><heading id="sec.55-he" guid="_612486c9-9885-4e66-a40d-5bd0804cd15d">Location for taking water</heading><block><txt break.before="1">The location for taking water, stated on a water allocation, must include the place at which water could have been taken under the authorisation.</txt></block></clause><clause id="sec.56" guid="_d2041a09-8e47-4643-bf6f-340b81974761" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>56</no><heading id="sec.56-he" guid="_fee9dc84-6787-4b3a-a1b9-12c77df2ac4b">Purpose to be stated on water allocation</heading><block><txt break.before="1">The purpose stated on a water allocation must be—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.56-para1.a" guid="_bdf8aeb2-be90-4962-9978-f7646f6592a2" provision.type="other"><no>(a)</no><block><txt break.before="0">if the purpose stated on the authorisation is stock, domestic, irrigation, stock intensive, agriculture or a similar purpose—‘rural’; or</txt></block></li><li id="sec.56-para1.b" guid="_246629d9-d2df-4512-b753-262cef1e01e0" provision.type="other"><no>(b)</no><block><txt break.before="0">if the purpose stated on the authorisation is ‘distribution loss’—‘distribution loss’; or</txt></block></li><li id="sec.56-para1.c" guid="_e6adb80f-d7e6-4b08-bc95-ea7cac825d1b" provision.type="other"><no>(c)</no><block><txt break.before="0">for an authorisation to take water held by the North Burdekin Water Board or the South Burdekin Water Board—a purpose related to supplementing a water supply scheme; or</txt></block></li><li id="sec.56-para1.d" guid="_5234ec5f-87ff-4cc5-aeee-fbdf73d99203" provision.type="other"><no>(d)</no><block><txt break.before="0">otherwise—‘any’.</txt></block></li></list></block></clause></subdivision><subdivision id="pt.5-div.6-sdiv.2" guid="_275f9567-2583-4187-902d-230e51cba5b0" status="repealed" affected.by.uncommenced="0" toc="no"><no>Subdivision 2</no><heading id="pt.5-div.6-sdiv.2-he" guid="_e6122b68-3f88-4bd8-bac4-ccb51a6d4011">Water allocations to take supplemented water</heading><historynote><txt break.before="1"><b>sdiv 2 (ss 57–61)</b> om <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.45" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;45</legref></txt></historynote><clause id="sec.57" guid="_8b9ca033-7366-4e04-bdbf-d115d5b9a680" status="repealed" affected.by.uncommenced="0" spent.amends="0" provision.type="other" toc="no"><no>57</no><repealed><repealedtxt/></repealed><historynote><txt break.before="1"><b>sdiv 2 (ss 57–61)</b> om <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.45" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;45</legref></txt></historynote></clause><clause id="sec.58" guid="_528d0321-c648-4419-878c-19db1b4f266b" status="repealed" affected.by.uncommenced="0" spent.amends="0" provision.type="other" toc="no"><no>58</no><repealed><repealedtxt/></repealed><historynote><txt break.before="1"><b>sdiv 2 (ss 57–61)</b> om <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.45" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;45</legref></txt></historynote></clause><clause id="sec.59" guid="_03665ed9-fc26-437e-baa8-adccb16eaf9c" status="repealed" affected.by.uncommenced="0" spent.amends="0" provision.type="other" toc="no"><no>59</no><repealed><repealedtxt/></repealed><historynote><txt break.before="1"><b>sdiv 2 (ss 57–61)</b> om <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.45" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;45</legref></txt></historynote></clause><clause id="sec.60" guid="_0cf8ffde-0e65-451b-abc6-37db70007bc7" status="repealed" affected.by.uncommenced="0" spent.amends="0" provision.type="other" toc="no"><no>60</no><repealed><repealedtxt/></repealed><historynote><txt break.before="1"><b>sdiv 2 (ss 57–61)</b> om <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.45" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;45</legref></txt></historynote></clause><clause id="sec.61" guid="_6d5e6345-9695-4f50-b30b-b4e41f2f5ebb" status="repealed" affected.by.uncommenced="0" spent.amends="0" provision.type="other" toc="no"><no>61</no><repealed><repealedtxt/></repealed><historynote><txt break.before="1"><b>sdiv 2 (ss 57–61)</b> om <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.45" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;45</legref></txt></historynote></clause></subdivision><subdivision id="pt.5-div.6-sdiv.3" guid="_10565a6e-944c-47c8-8639-8cc04e9cedaf" affected.by.uncommenced="0" numbering.style="manual"><no>Subdivision 3</no><heading id="pt.5-div.6-sdiv.3-he" guid="_f8e71c01-d569-410b-b89a-b9329234612e">Water allocations to take unsupplemented water</heading><clause id="sec.62" guid="_85f9f581-6d41-4b28-a62b-89a523244788" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>62</no><heading id="sec.62-he" guid="_ae75c625-7fca-4671-b549-de5fde0935cd">Authorisations to be converted</heading><block><txt break.before="1">The authorisations to be converted to water allocations to take unsupplemented water are water licences to take unsupplemented water—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.62-para1.a" guid="_608fefa2-183d-45d5-976f-e2e5d5d23d9a" provision.type="other"><no>(a)</no><block><txt break.before="0">from—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.62-para1.a-para2.i" guid="_f17fa886-e17b-4693-88cb-22e430fca994" provision.type="other"><no>(i)</no><block><txt break.before="0">the Burdekin River downstream of node 7 including the anabranch; or</txt></block></li><li id="sec.62-para1.a-para2.ii" guid="_34126ba2-8ac0-40f2-a9cc-a00fc185a2e6" provision.type="other"><no>(ii)</no><block><txt break.before="0">the Haughton River downstream of node 3; or</txt></block></li><li id="sec.62-para1.a-para2.iii" guid="_10a0c0cb-cf2b-4d32-9cf9-8ff945306996" provision.type="other"><no>(iii)</no><block><txt break.before="0">the Bowen River downstream of node 13; and</txt></block></li></list></block></li><li id="sec.62-para1.b" guid="_9b77f60d-6b30-4d8c-8049-4483ff0f937a" provision.type="other"><no>(b)</no><block><txt break.before="0">that state flow conditions.</txt></block></li></list></block></clause><clause id="sec.63" guid="_8699b013-edc3-49d6-ac0d-da0e3342eefe" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>63</no><heading id="sec.63-he" guid="_52672ca3-1bc1-4bc1-a500-e6caa4aecb9f">Elements of a water allocation to take unsupplemented water</heading><block><txt break.before="1">A water allocation to take unsupplemented water must state the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.63-para1.a" guid="_31a4afb5-e566-48f8-94c9-0ad339dd23e0" provision.type="other"><no>(a)</no><block><txt break.before="0">the maximum rate at which water may be taken under the allocation;</txt></block></li><li id="sec.63-para1.b" guid="_a4e0756a-6526-48a7-a758-3f54f059bb6e" provision.type="other"><no>(b)</no><block><txt break.before="0">the daily volumetric limit for the allocation;</txt></block></li><li id="sec.63-para1.c" guid="_4d3040fd-2572-4c8c-b970-cac7484f0cc0" provision.type="other"><no>(c)</no><block><txt break.before="0">the annual volumetric limit for the allocation;</txt></block></li><li id="sec.63-para1.d" guid="_84e25b4a-8e69-4555-b016-9ba1cc953233" provision.type="other"><no>(d)</no><block><txt break.before="0">the flow conditions for the allocation.</txt></block></li></list></block><historynote><txt break.before="1"><b><intref refid="sec.28-he" target.guid="_8699b013-edc3-49d6-ac0d-da0e3342eefe" check="valid">s&#160;63</intref></b> sub <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.46" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;46</legref></txt></historynote></clause><clause id="sec.64" guid="_36072af7-f6d9-471a-890f-54d9095f5bb9" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>64</no><heading id="sec.64-he" guid="_51146b26-b2df-4261-9f0e-8ead65bc81e0">Nominal volumes for water allocations to take unsupplemented water</heading><block><txt break.before="1">In deciding the nominal volume for a water allocation to take unsupplemented water, the chief executive must have regard to the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.64-para1.a" guid="_810f5710-f987-4fea-ba51-8245ce0a173a" provision.type="other"><no>(a)</no><block><txt break.before="0">the local availability of water;</txt></block></li><li id="sec.64-para1.b" guid="_cde69f1b-e3e0-4768-9b24-d944f99dfa91" provision.type="other"><no>(b)</no><block><txt break.before="0">the conditions under which water may be taken under the authorisation;</txt></block></li><li id="sec.64-para1.c" guid="_ba99c2b9-c259-49d1-87f1-f091e92943e9" provision.type="other"><no>(c)</no><block><txt break.before="0">if the authorisation states any volumetric limits—the volumetric limits;</txt></block></li><li id="sec.64-para1.d" guid="_405957f6-ca09-4293-ab7a-c949b96fdb3a" provision.type="other"><no>(d)</no><block><txt break.before="0">the simulated mean annual diversion for the authorisation.</txt></block></li></list></block></clause><clause id="sec.65" guid="_5c987766-f3ed-4e9f-b602-ee6da7ecfa2e" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>65</no><heading id="sec.65-he" guid="_acaebc59-2f4e-4cda-911d-867c4fc6fa40">Maximum rates for taking unsupplemented water</heading><subclause id="sec.65-ssec.1" guid="_dab1248f-b936-42e8-b13f-de12a68d3bd2" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The maximum rate at which unsupplemented water may be taken under a water allocation is—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.65-ssec.1-para1.a" guid="_93613d60-8207-40f2-9273-a3ba7ceef122" provision.type="other"><no>(a)</no><block><txt break.before="0">for an authorisation that states a maximum rate—the stated rate; and</txt></block></li><li id="sec.65-ssec.1-para1.b" guid="_f8c8797c-47c5-44b0-b2b0-bf8b50073d42" provision.type="other"><no>(b)</no><block><txt break.before="0">for an authorisation that does not state a maximum rate but for which a related development permit—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.65-ssec.1-para1.b-para2.i" guid="_f2fb8667-6f6f-4f6b-9655-ec2d380dcac3" provision.type="other"><no>(i)</no><block><txt break.before="0">states a pump size mentioned in <intref refid="sec.28-he" target.guid="_fabf83f8-c56c-4fe0-b5f5-772e08d62a61" check="valid">schedule&#160;8</intref>, column 1—the rate stated in <intref refid="sec.28-he" target.guid="_fabf83f8-c56c-4fe0-b5f5-772e08d62a61" check="valid">schedule&#160;8</intref>, column 2, for the pump size; or</txt></block></li><li id="sec.65-ssec.1-para1.b-para2.ii" guid="_bcb13c53-d0a8-4c43-8261-d68977ad6e61" provision.type="other"><no>(ii)</no><block><txt break.before="0">states a pump size other than a pump size mentioned in <intref refid="sec.28-he" target.guid="_fabf83f8-c56c-4fe0-b5f5-772e08d62a61" check="valid">schedule&#160;8</intref>, column 1—the rate decided by the chief executive having regard to the rates stated for similar pump sizes in <intref refid="sec.28-he" target.guid="_fabf83f8-c56c-4fe0-b5f5-772e08d62a61" check="valid">schedule&#160;8</intref>, column 2; and</txt></block></li></list></block></li><li id="sec.65-ssec.1-para1.c" guid="_4ae1178b-6a64-4441-bc60-ab59ba020c51" provision.type="other"><no>(c)</no><block><txt break.before="0">for another authorisation—the rate decided by the chief executive having regard to—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.65-ssec.1-para1.c-para2.i" guid="_a5619da1-b0aa-4155-8149-508f5caed297" provision.type="other"><no>(i)</no><block><txt break.before="0">the type of authorisation; and</txt></block></li><li id="sec.65-ssec.1-para1.c-para2.ii" guid="_9ea47b0b-396a-488f-bb31-841efaab4139" provision.type="other"><no>(ii)</no><block><txt break.before="0">an estimate or measurement of the rate at which water can be taken under the authorisation.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.65-ssec.2" guid="_1891886b-80d4-4f60-8a65-3a927ed315ac" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">However, for <intref refid="sec.28-he" target.guid="_dab1248f-b936-42e8-b13f-de12a68d3bd2" check="valid">subsection&#160;(1)</intref><intref refid="sec.28-he" target.guid="_f8c8797c-47c5-44b0-b2b0-bf8b50073d42" check="valid">(b)</intref>, if the authorisation holder satisfies the chief executive that the maximum rate at which water can be taken is different from the rate decided under the subsection, the maximum rate is the rate decided by the chief executive having regard to the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.65-ssec.2-para1.a" guid="_65944546-d38a-4aa3-b6de-fe02df9d5322" provision.type="other"><no>(a)</no><block><txt break.before="0">the conditions under which the water may be taken;</txt></block></li><li id="sec.65-ssec.2-para1.b" guid="_e74a9684-0e1e-4d7b-8e86-a0e45b943cef" provision.type="other"><no>(b)</no><block><txt break.before="0">the water taking capacity of the pump to which the development permit relates (the <defterm id="sec.65-ssec.2-def.existingpump" guid="_a0282e96-1142-41b8-aedd-53c7b4d6ba98" type="definition">existing pump</defterm>);</txt></block></li><li id="sec.65-ssec.2-para1.c" guid="_777331c7-6e80-4224-a9aa-886873b22345" provision.type="other"><no>(c)</no><block><txt break.before="0">the irrigation or water distribution system related to the existing pump during the period of not more than 10 years immediately before the commencement of this plan;</txt></block></li><li id="sec.65-ssec.2-para1.d" guid="_b0cbcf46-c2aa-4fb2-84d7-82b6972e012d" provision.type="other"><no>(d)</no><block><txt break.before="0">the efficiency of the water use mentioned in paragraph (c).</txt></block></li></list></block></subclause></clause><clause id="sec.66" guid="_b4ec3958-f27e-4f51-bf38-4818a0d453c3" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>66</no><heading id="sec.66-he" guid="_f584200c-8052-40a1-bdba-aba9e125f97f">Daily volumetric limits for taking unsupplemented water</heading><subclause id="sec.66-ssec.1" guid="_8d5fc794-5b94-4a4c-a63f-e5e472fb513b" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The daily volumetric limit for a water allocation to take unsupplemented water is—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.66-ssec.1-para1.a" guid="_91334e70-4e75-43d2-b72d-8e364f39f733" provision.type="other"><no>(a)</no><block><txt break.before="0">for an authorisation that states the volume of water that may be taken in a day—the stated volume; and</txt></block></li><li id="sec.66-ssec.1-para1.b" guid="_13810e7f-20c2-4f70-8169-7fea85995f22" provision.type="other"><no>(b)</no><block><txt break.before="0">for an authorisation that does not state a volume but for which a related development permit—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.66-ssec.1-para1.b-para2.i" guid="_ef0066ba-f8e2-43ac-a2c3-66ca3e2453bf" provision.type="other"><no>(i)</no><block><txt break.before="0">states a pump size mentioned in <intref refid="sec.28-he" target.guid="_fabf83f8-c56c-4fe0-b5f5-772e08d62a61" check="valid">schedule&#160;8</intref>, column 1—the daily volumetric limit stated in <intref refid="sec.28-he" target.guid="_fabf83f8-c56c-4fe0-b5f5-772e08d62a61" check="valid">schedule&#160;8</intref>, column 3, for the pump size; or</txt></block></li><li id="sec.66-ssec.1-para1.b-para2.ii" guid="_d6d8e139-da0d-4c66-9ca1-987878768aec" provision.type="other"><no>(ii)</no><block><txt break.before="0">states a pump size other than a pump size mentioned in <intref refid="sec.28-he" target.guid="_fabf83f8-c56c-4fe0-b5f5-772e08d62a61" check="valid">schedule&#160;8</intref>, column 1—the daily volumetric limit decided by the chief executive having regard to the daily volumetric limits stated for similar pump sizes in <intref refid="sec.28-he" target.guid="_fabf83f8-c56c-4fe0-b5f5-772e08d62a61" check="valid">schedule&#160;8</intref>, column 3; and</txt></block></li></list></block></li><li id="sec.66-ssec.1-para1.c" guid="_938a310d-a61c-49b3-a9a6-5433732477d4" provision.type="other"><no>(c)</no><block><txt break.before="0">for another authorisation—the daily volumetric limit decided by the chief executive having regard to—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.66-ssec.1-para1.c-para2.i" guid="_2adb9e68-682b-422e-a6c1-73576c82a52a" provision.type="other"><no>(i)</no><block><txt break.before="0">the type of authorisation; and</txt></block></li><li id="sec.66-ssec.1-para1.c-para2.ii" guid="_9ef52496-f04b-427e-babe-91ab3eb119d6" provision.type="other"><no>(ii)</no><block><txt break.before="0">an estimate or measurement of the rate at which water can be taken under the authorisation.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.66-ssec.2" guid="_8a6da032-b1b3-4179-a09b-090efec0dc90" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">However, for <intref refid="sec.28-he" target.guid="_8d5fc794-5b94-4a4c-a63f-e5e472fb513b" check="valid">subsection&#160;(1)</intref><intref refid="sec.28-he" target.guid="_13810e7f-20c2-4f70-8169-7fea85995f22" check="valid">(b)</intref>, if the authorisation holder satisfies the chief executive that the water taking capacity of the pump is different from the daily volumetric limit decided under the subsection, the daily volumetric limit is the volume decided by the chief executive having regard to the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.66-ssec.2-para1.a" guid="_d7e2e3a7-4895-4b82-94f6-4a786f690abd" provision.type="other"><no>(a)</no><block><txt break.before="0">the conditions under which the water may be taken under the authorisation;</txt></block></li><li id="sec.66-ssec.2-para1.b" guid="_b7ac2315-54a0-416e-b443-5fb992b117a4" provision.type="other"><no>(b)</no><block><txt break.before="0">the water taking capacity of the pump to which the development permit relates (the <defterm id="sec.66-ssec.2-def.existingpump" guid="_70760a19-52d4-4c13-b88e-1a353400bb38" type="definition">existing pump</defterm>) under normal operating conditions;</txt></block></li><li id="sec.66-ssec.2-para1.c" guid="_1e05ecdb-47d0-4eb6-a35c-870d10f3afad" provision.type="other"><no>(c)</no><block><txt break.before="0">the irrigation or water distribution system related to the existing pump during the period of not more than 10 years immediately before the commencement of this plan;</txt></block></li><li id="sec.66-ssec.2-para1.d" guid="_74846729-e9d2-441e-b968-9b9f35faf963" provision.type="other"><no>(d)</no><block><txt break.before="0">the efficiency of the water use mentioned in paragraph (c).</txt></block></li></list></block></subclause><subclause id="sec.66-ssec.3" guid="_c114da95-6e4b-419d-8aed-1d554e36b53c" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive must ensure the daily volumetric limit for a water allocation is not more than the total volume that could be taken in a day at the maximum rate decided, for the water allocation, under <intref refid="sec.28-he" target.guid="_5c987766-f3ed-4e9f-b602-ee6da7ecfa2e" check="valid">section&#160;65</intref>.</txt></block></subclause></clause><clause id="sec.67" guid="_46ba0fb4-faf5-46b1-b254-978128512055" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>67</no><heading id="sec.67-he" guid="_580e2a25-4959-41a3-af8f-ecc2ca6481d2">Annual volumetric limits for taking unsupplemented water</heading><block><txt break.before="1">The annual volumetric limit for a water allocation to take unsupplemented water is—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.67-para1.a" guid="_351d3793-afcf-4aba-83ca-f40ae7859aab" provision.type="other"><no>(a)</no><block><txt break.before="0">for an authorisation that states the volume of water that may be taken in a period of 12 months—the stated volume; and</txt></block></li><li id="sec.67-para1.b" guid="_c78626ee-ad41-4ba7-9f75-144eb058d1e9" provision.type="other"><no>(b)</no><block><txt break.before="0">for another authorisation—the volume decided by the chief executive having regard to the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.67-para1.b-para2.i" guid="_8640bd9c-5e4d-4c2e-bbf6-11fc46477b28" provision.type="other"><no>(i)</no><block><txt break.before="0">the conditions under which water may be taken under the authorisation;</txt></block></li><li id="sec.67-para1.b-para2.ii" guid="_54162fed-92c9-470a-aaf4-57c294e9e962" provision.type="other"><no>(ii)</no><block><txt break.before="0">the water taking capacity of any works for taking water under the authorisation;</txt></block></li><li id="sec.67-para1.b-para2.iii" guid="_97611083-5d93-4f50-bbf3-794abeb55d25" provision.type="other"><no>(iii)</no><block><txt break.before="0">the volume required for the allocation’s intended purpose;</txt></block></li><li id="sec.67-para1.b-para2.iv" guid="_dc61ed4a-cb41-4e7c-86f6-b73fc843ba86" provision.type="other"><no>(iv)</no><block><txt break.before="0">the annual volumes of water estimated by the chief executive to have been taken under the authorisation during the period, of not more than 10 years, immediately before the commencement of this plan;</txt></block></li><li id="sec.67-para1.b-para2.v" guid="_8ecc8298-768e-4d41-a0d3-e780a8299c04" provision.type="other"><no>(v)</no><block><txt break.before="0">the efficiency of the use of the water mentioned in subparagraph (iv).</txt></block></li></list></block></li></list></block></clause><clause id="sec.68" guid="_279e91e1-96ac-4b14-b4a6-c50a8d08f62b" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>68</no><heading id="sec.68-he" guid="_91a504a3-2ab2-4ac8-9ff6-e94c180a82a0">Conditions for taking unsupplemented water</heading><subclause id="sec.68-ssec.1" guid="_43d6689f-fdc9-4ad9-9a8d-0c525d55b022" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may impose on a water allocation to take unsupplemented water any condition the chief executive is satisfied is necessary to ensure the purpose and outcomes of this plan are achieved.</txt></block></subclause><subclause id="sec.68-ssec.2" guid="_d545a769-72e4-4b5f-a4f6-2dee3b483198" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">In deciding the flow conditions under which water may be taken under the allocation, the chief executive must have regard to the conditions stated on the authorisation.</txt></block></subclause></clause><clause id="sec.69" guid="_7c82e87e-cd2e-4336-929d-630069e7fc19" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>69</no><heading id="sec.69-he" guid="_b3904306-20b4-4e52-9abf-da3a2c56f103">Water allocation groups for water allocations to take unsupplemented water</heading><block><txt break.before="1">A water allocation to take unsupplemented water belongs to—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.69-para1.a" guid="_fb25e5c1-d98f-40c1-9533-9014d532bbfe" provision.type="other"><no>(a)</no><block><txt break.before="0">for a water allocation in subcatchment area A—water allocation group A1; and</txt></block></li><li id="sec.69-para1.b" guid="_f1fa945e-4cf2-4f42-825a-0cb3aada99b5" provision.type="other"><no>(b)</no><block><txt break.before="0">for a water allocation in subcatchment area B—water allocation group B1; and</txt></block></li><li id="sec.69-para1.c" guid="_d41ea0ee-3c39-4465-8ad6-33f94f85e1a8" provision.type="other"><no>(c)</no><block><txt break.before="0">for a water allocation in subcatchment area C—water allocation group C1.</txt></block></li></list></block></clause></subdivision></division><division id="pt.5-div.7" guid="_868c9822-c885-45db-90f3-b7e4ce48c757" affected.by.uncommenced="0" numbering.style="manual"><no>Division 7</no><heading id="pt.5-div.7-he" guid="_3f408034-1d9b-444b-ad8d-b07117ff8fe8">Water licences to take or interfere with unsupplemented water</heading><clause id="sec.70" guid="_32971d46-2a9c-48e1-a83c-b22469cc5c5c" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>70</no><heading id="sec.70-he" guid="_cb3c2529-bda6-445e-913e-4129c1f1276f">Application of div 7</heading><block><txt break.before="1">This division applies only to water licences to take or interfere with unsupplemented water from a watercourse, lake or spring.</txt></block></clause><clause id="sec.71" guid="_4daba931-5f38-4cc7-84c6-414d8594c79b" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>71</no><heading id="sec.71-he" guid="_4a9d14ec-c8b5-491b-92a2-9e1c291df77d">Water licences to take unsupplemented water</heading><block><txt break.before="1">A water licence to take unsupplemented water must state the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.71-para1.a" guid="_beb6dd60-9ca8-4777-b105-dfa3a310739e" provision.type="other"><no>(a)</no><block><txt break.before="0">the purpose for which water may be taken under the licence, which must be 1 of the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.71-para1.a-para2.i" guid="_69f454e9-1ea5-452a-8bf7-3f63b9589165" provision.type="other"><no>(i)</no><block><txt break.before="0">stock and domestic;</txt></block></li><li id="sec.71-para1.a-para2.ii" guid="_e08ea0a6-e673-4a37-bb3d-1893c155f2ce" provision.type="other"><no>(ii)</no><block><txt break.before="0">rural;</txt></block></li><li id="sec.71-para1.a-para2.iii" guid="_e1a5f19f-07fa-40f4-8da3-b24785d7783a" provision.type="other"><no>(iii)</no><block><txt break.before="0">any;</txt></block></li></list></block></li><li id="sec.71-para1.b" guid="_ba4592be-b9c2-46d8-b7a4-65e2376ded88" provision.type="other"><no>(b)</no><block><txt break.before="0">the maximum rate at which the water may be taken under the licence;</txt></block></li><li id="sec.71-para1.c" guid="_d9813bbd-26dc-41d3-b0c1-2aa04e4d1763" provision.type="other"><no>(c)</no><block><txt break.before="0">the daily volumetric limit for the licence;</txt></block></li><li id="sec.71-para1.d" guid="_1a56c212-2eb7-4cdb-9ca0-497fc83d22ae" provision.type="other"><no>(d)</no><block><txt break.before="0">the annual volumetric limit for the licence.</txt></block></li></list></block><historynote><txt break.before="1"><b><intref refid="sec.28-he" target.guid="_4daba931-5f38-4cc7-84c6-414d8594c79b" check="valid">s&#160;71</intref></b> sub <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.47" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;47</legref></txt></historynote></clause><clause id="sec.72" guid="_eaefb9f5-488d-4fa5-a388-4c7e2080def3" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>72</no><heading id="sec.72-he" guid="_fa05b7f4-c43c-438c-a267-2943138c0110">Purpose to be stated on water licence to take unsupplemented water</heading><block><txt break.before="1">The purpose stated on a water licence to take unsupplemented water, replacing an existing licence, must be—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.72-para1.a" guid="_1e19f4ac-3a67-4784-98fb-370f84d5d74b" provision.type="other"><no>(a)</no><block><txt break.before="0">if the purpose stated on the existing licence is stock or domestic—‘stock and domestic’; or</txt></block></li><li id="sec.72-para1.b" guid="_e4b930cf-b2f6-4068-9224-012d26b8c9d0" provision.type="other"><no>(b)</no><block><txt break.before="0">if the purpose stated on the existing licence is irrigation, stock intensive, agriculture or a similar purpose—‘rural’; or</txt></block></li><li id="sec.72-para1.c" guid="_eead122e-1016-4900-80ff-175a4aebd005" provision.type="other"><no>(c)</no><block><txt break.before="0">otherwise—‘any’.</txt></block></li></list></block></clause><clause id="sec.73" guid="_7a9477d8-4422-41db-bd86-14d18cd631c3" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>73</no><heading id="sec.73-he" guid="_6a8c3b2c-6ef7-4cb5-8752-7cda1aed1dc9">Maximum rates for taking unsupplemented water</heading><block><txt break.before="1">The maximum rate at which unsupplemented water may be taken under a water licence is the maximum rate mentioned in <intref refid="sec.28-he" target.guid="_5c987766-f3ed-4e9f-b602-ee6da7ecfa2e" check="valid">section&#160;65</intref> or decided by the chief executive under that section as if the water licence were a water allocation.</txt></block><historynote><txt break.before="1"><b><intref refid="sec.28-he" target.guid="_7a9477d8-4422-41db-bd86-14d18cd631c3" check="valid">s&#160;73</intref></b> sub <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.48" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;48</legref></txt></historynote></clause><clause id="sec.74" guid="_aea7cffb-e1f8-4480-bf52-5b909d1f483d" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>74</no><heading id="sec.74-he" guid="_d3f9f826-74b6-412c-8230-4ef2718227ca">Daily volumetric limits for taking unsupplemented water</heading><block><txt break.before="1">The daily volumetric limit to take unsupplemented water under a water licence is the annual volumetric limit mentioned in <intref refid="sec.28-he" target.guid="_b4ec3958-f27e-4f51-bf38-4818a0d453c3" check="valid">section&#160;66</intref> or decided by the chief executive under that section as if the water licence were a water allocation.</txt></block><historynote><txt break.before="1"><b><intref refid="sec.28-he" target.guid="_aea7cffb-e1f8-4480-bf52-5b909d1f483d" check="valid">s&#160;74</intref></b> sub <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.48" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;48</legref></txt></historynote></clause><clause id="sec.75" guid="_1f6bf91c-298e-4679-9832-c3525ea16e56" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>75</no><heading id="sec.75-he" guid="_c6f2286b-a73b-415b-934b-f0e02d0c171e">Annual volumetric limits for taking unsupplemented water</heading><block><txt break.before="1">The annual volumetric limit for a water licence to take unsupplemented water is—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.75-para1.a" guid="_8a35af46-1b83-4808-bb61-e2692810cad2" provision.type="other"><no>(a)</no><block><txt break.before="0">for a licence that states the volume of water that may be taken in a period of 12 months—the stated volume; and</txt></block></li><li id="sec.75-para1.b" guid="_2dfb29c9-4862-4089-8085-06f4deeeedef" provision.type="other"><no>(b)</no><block><txt break.before="0">for a licence that states the area that may be irrigated—the volume decided by the chief executive having regard to the volume of water required for the licence’s intended purpose, but not more than the volume, expressed in megalitres, calculated by multiplying the area, in hectares, by—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.75-para1.b-para2.i" guid="_0010f66e-5587-40c9-bb35-cf1c078e27a9" provision.type="other"><no>(i)</no><block><txt break.before="0">for subcatchment areas A and B—8; and</txt></block></li><li id="sec.75-para1.b-para2.ii" guid="_4793ef57-0cc6-4b0f-baea-bfdda40fb1d7" provision.type="other"><no>(ii)</no><block><txt break.before="0">for subcatchment area C—9; and</txt></block></li><li id="sec.75-para1.b-para2.iii" guid="_f1eb6605-9bfc-4f9f-84c0-a2697fb32188" provision.type="other"><no>(iii)</no><block><txt break.before="0">for subcatchment area D—6; and</txt></block></li><li id="sec.75-para1.b-para2.iv" guid="_4d23649f-729d-4e49-baea-5f0bd362fad9" provision.type="other"><no>(iv)</no><block><txt break.before="0">for other subcatchment areas—12; and</txt></block></li></list></block></li><li id="sec.75-para1.c" guid="_6b0e2516-b53b-4bb5-84a8-d83ae1ad4b3a" provision.type="other"><no>(c)</no><block><txt break.before="0">for another licence—the volume decided by the chief executive having regard to the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.75-para1.c-para2.i" guid="_4238b869-d0ef-4931-96df-2497b370310b" provision.type="other"><no>(i)</no><block><txt break.before="0">the conditions under which water may be taken under the licence;</txt></block></li><li id="sec.75-para1.c-para2.ii" guid="_cf0309f4-a4b9-44de-ae7b-2c7ba59d5aea" provision.type="other"><no>(ii)</no><block><txt break.before="0">the water taking capacity of any works for taking water under the licence;</txt></block></li><li id="sec.75-para1.c-para2.iii" guid="_e360d0d8-11dd-4d4e-bfaf-cd61cdc8f6d8" provision.type="other"><no>(iii)</no><block><txt break.before="0">the volume required for the licence’s intended purpose;</txt></block></li><li id="sec.75-para1.c-para2.iv" guid="_69c7d1b5-89e9-4a2a-91bc-99af3e36d309" provision.type="other"><no>(iv)</no><block><txt break.before="0">the annual volumes of water estimated by the chief executive to have been taken under the licence during the period, of not more than 10 years, immediately before the commencement of this plan;</txt></block></li><li id="sec.75-para1.c-para2.v" guid="_6686ed9a-a79a-447e-ad4c-03f257d4a1ae" provision.type="other"><no>(v)</no><block><txt break.before="0">the efficiency of the use of the water mentioned in subparagraph (iv).</txt></block></li></list></block></li></list></block></clause><clause id="sec.76" guid="_a5a3f8a8-3291-4f0b-abcd-3b4ac9c9d0eb" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>76</no><heading id="sec.76-he" guid="_c2a32fe7-471d-43ea-95b5-c784b8effa69">Conditions for taking unsupplemented water</heading><subclause id="sec.76-ssec.1" guid="_08edebe1-6b37-41cd-908d-2e4fa6d73311" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may impose on a water licence to take unsupplemented water any condition the chief executive is satisfied is necessary to ensure the purpose and outcomes of this plan are achieved.</txt></block></subclause><subclause id="sec.76-ssec.2" guid="_18826de3-e257-49b7-8c22-85b93562851e" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">In deciding the flow conditions under which water may be taken under the licence, the chief executive must have regard to the conditions stated on the licence.</txt></block></subclause></clause><clause id="sec.77" guid="_1273cd92-8c15-458a-94df-e744d37a1ab4" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>77</no><heading id="sec.77-he" guid="_1eb57bad-30cd-4015-9aa7-b5028a4e46d9">Storing unsupplemented water taken under a water licence</heading><subclause id="sec.77-ssec.1" guid="_d2ee7898-729a-4077-9ce4-a52185a6f737" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">Without limiting <intref refid="sec.28-he" target.guid="_a5a3f8a8-3291-4f0b-abcd-3b4ac9c9d0eb" check="valid">section&#160;76</intref><intref refid="sec.28-he" target.guid="_08edebe1-6b37-41cd-908d-2e4fa6d73311" check="valid">(1)</intref>, the chief executive may impose, on a water licence to take unsupplemented water, a condition that states the works that may be used to store the water taken under the licence.</txt></block></subclause><subclause id="sec.77-ssec.2" guid="_9bc69c24-371a-4f78-86e3-0062d1c269d9" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">In deciding whether to impose the condition mentioned in <intref refid="sec.28-he" target.guid="_d2ee7898-729a-4077-9ce4-a52185a6f737" check="valid">subsection&#160;(1)</intref>, the chief executive must have regard to the capacity of any existing overland flow works being used to store the water.</txt></block></subclause></clause><clause id="sec.78" guid="_9948ea8c-0dac-43d7-b62a-8a0f0dedb946" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>78</no><heading id="sec.78-he" guid="_184df8a6-d4bf-4cf8-a2f3-cd30088096e4">Conditions giving effect to rules</heading><subclause id="sec.78-ssec.1" guid="_5fe8b0a3-2559-4296-b582-fb272bceb848" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0"><intref refid="sec.28-he" target.guid="_d4c75466-2ad8-4424-a3ae-4121cffe6dbf" check="valid">Subsection&#160;(2)</intref> applies to any environmental management rules, operating rules or water sharing rules included in the resource operations plan.</txt></block></subclause><subclause id="sec.78-ssec.2" guid="_d4c75466-2ad8-4424-a3ae-4121cffe6dbf" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.78-ssec.2-para1.a" guid="_458a6630-1d2a-463b-a03b-793f41a384a4" provision.type="other"><no>(a)</no><block><txt break.before="0">amend water licences, in existence on the commencement of the resource operations plan, to impose conditions giving effect to the rules; and</txt></block></li><li id="sec.78-ssec.2-para1.b" guid="_2b53a6ae-9422-4cfd-9893-85b19f1be021" provision.type="other"><no>(b)</no><block><txt break.before="0">impose conditions, giving effect to the rules, on water licences granted after the commencement.</txt></block></li></list></block></subclause></clause></division><division id="pt.5-div.8" guid="_66a3c74f-b8af-446b-9bc9-4f3646a7dbcb" affected.by.uncommenced="0" numbering.style="manual"><no>Division 8</no><heading id="pt.5-div.8-he" guid="_41cc86cb-27cb-4c9a-b098-b7ea1013cfbc">Regulation of overland flow water</heading><clause id="sec.79" guid="_6d180080-38e9-43dd-9fb4-1c9897e83c25" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>79</no><heading id="sec.79-he" guid="_04aadb94-1fdc-4039-ba93-0a035c10a351">Limitation on taking overland flow water—<legref jurisd="QLD" type="act" target.doc.id="UNKNOWN" check="invalid">Act</legref>, <intref refid="sec.28-he" target.guid="_52e619e7-d67b-41b2-8f6f-7b89c87d1aff" check="valid">s&#160;20</intref><intref refid="sec.28-he" target.guid="_66349096-4a9a-470e-8c61-4c1eab794b12" check="valid">(2)</intref></heading><subclause id="sec.79-ssec.1" guid="_899b592b-2fe6-4493-9fcf-947c5ab0711a" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">A person may not take overland flow water other than—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.79-ssec.1-para1.a" guid="_4ead4267-9954-4684-bc7a-fd16dfd7f49e" provision.type="other"><no>(a)</no><block><txt break.before="0">for stock or domestic purposes; or</txt></block></li><li id="sec.79-ssec.1-para1.b" guid="_c042466d-dc15-46d3-9868-7f6443facc95" provision.type="other"><no>(b)</no><block><txt break.before="0">for another purpose if the works for taking the overland flow water have a capacity of not more than 250ML; or</txt></block></li><li id="sec.79-ssec.1-para1.c" guid="_b68f98ec-718f-4e43-875e-e938242534f1" provision.type="other"><no>(c)</no><block><txt break.before="0">under a water licence; or</txt></block></li><li id="sec.79-ssec.1-para1.d" guid="_d076f88f-8f02-41c1-8dc9-65a22a535ff9" provision.type="other"><no>(d)</no><block><txt break.before="0">overland flow water of not more than the amount necessary to satisfy the requirements of—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.79-ssec.1-para1.d-para2.i" guid="_3d5ac817-ae0d-4953-a652-1b66b84ab0bb" provision.type="other"><no>(i)</no><block><txt break.before="0">an environmental authority issued under the <legref jurisd="QLD" type="act" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" check="valid"><name emphasis="yes">Environmental Protection Act 1994</name></legref>; or</txt></block></li><li id="sec.79-ssec.1-para1.d-para2.ii" guid="_f103b1be-e09b-4e57-86ea-44c6dbee1dff" provision.type="other"><no>(ii)</no><block><txt break.before="0">a development permit for carrying out an environmentally relevant activity, other than a mining or petroleum activity, under the <legref jurisd="QLD" type="act" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" check="valid"><name emphasis="yes">Environmental Protection Act 1994</name></legref>; or</txt></block></li></list></block></li><li id="sec.79-ssec.1-para1.e" guid="_8bdad86c-db30-42cc-84d5-dd302012ad3d" provision.type="other"><no>(e)</no><block><txt break.before="0">overland flow water that is contaminated agricultural runoff water; or</txt></block></li><li id="sec.79-ssec.1-para1.f" guid="_f1077152-887d-4d04-83b1-fd78e558788f" provision.type="other"><no>(f)</no><block><txt break.before="0">under an authority under <intref refid="sec.28-he" target.guid="_1900aff6-1eae-40f8-a720-af9e4d61b325" check="valid">section&#160;80</intref>.</txt></block></li></list></block></subclause><subclause id="sec.79-ssec.2" guid="_b4e0333c-b29d-4a35-b1be-305781362cda" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sec.79-ssec.2-def.contaminatedagriculturalrunoffwater_" guid="_9ef94844-76ba-4f96-b742-cec79b888fb0" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.79-ssec.2-def.contaminatedagriculturalrunoffwater" guid="_5552b836-2df0-4881-95f4-2b37967ea485" type="definition">contaminated agricultural runoff water</defterm> has the meaning given by the ‘Code for Assessable Development for Operational Works for Taking Overland Flow Water’.</txt><note id="sec.79-ssec.2-def.contaminatedagriculturalrunoffwater-note" guid="_b92bba55-af66-4b22-9388-d76d9fcd7a1c" type="editorial"><heading id="sec.79-ssec.2-def.contaminatedagriculturalrunoffwater-note-he" guid="_62bcaeec-cdee-4b51-a0b6-8166b55c6015">Editor’s note—</heading><block><txt break.before="1">A copy of the code is available on the department’s website.</txt></block></note></definition></deflist></block></subclause><historynote><txt break.before="1"><b><intref refid="sec.28-he" target.guid="_6d180080-38e9-43dd-9fb4-1c9897e83c25" check="valid">s&#160;79</intref></b> amd <legref jurisd="QLD" type="act" target.doc.id="act-2013-023" target.version.series="112c4ad2-e75f-445b-bf13-21664fb9cc0c" valid.date="as.made" check="valid">2013 Act&#160;No.&#160;23</legref><legref jurisd="QLD" type="act" refid="sec.352" target.doc.id="act-2013-023" valid.date="as.made" check="invalid">s&#160;352</legref><legref jurisd="QLD" type="act" refid="sch.1" target.doc.id="act-2013-023" valid.date="as.made" check="invalid">sch&#160;1</legref> pt 2</txt></historynote></clause><clause id="sec.80" guid="_1900aff6-1eae-40f8-a720-af9e4d61b325" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>80</no><heading id="sec.80-he" guid="_0d670ca8-62c2-48e1-94bd-a5d167708ce3">Taking water using particular existing overland flow works authorised</heading><subclause id="sec.80-ssec.1" guid="_b285e276-0684-49cc-9fb8-f4821c21fafd" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the owner of land on which existing overland flow works are situated, other than works for taking only the overland flow water that may be taken under <intref refid="sec.28-he" target.guid="_6d180080-38e9-43dd-9fb4-1c9897e83c25" check="valid">section&#160;79</intref><intref refid="sec.28-he" target.guid="_899b592b-2fe6-4493-9fcf-947c5ab0711a" check="valid">(1)</intref><intref refid="sec.28-he" target.guid="_4ead4267-9954-4684-bc7a-fd16dfd7f49e" check="valid">(a)</intref> to <intref refid="sec.28-he" target.guid="_8bdad86c-db30-42cc-84d5-dd302012ad3d" check="valid">(e)</intref>.</txt></block></subclause><subclause id="sec.80-ssec.2" guid="_a822ac91-2533-461b-95d6-36a94712cc3d" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The owner may continue to use the existing overland flow works to take overland flow water for 1 year after the commencement of this plan.</txt></block></subclause><subclause id="sec.80-ssec.3" guid="_c70145ee-1f40-4a87-a13c-5a985a4e3ab8" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, if the owner gives the chief executive notice of the existing overland flow works, in the approved form, and any further information reasonably required by the chief executive about the works, the owner may continue to use the works to take overland flow water after the notice and information are given.</txt></block></subclause><subclause id="sec.80-ssec.4" guid="_f65672ca-c09b-4c4c-adca-d898663680bb" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sec.80-ssec.4-def.existingoverlandflowworks_" guid="_bcf45b57-e3cf-4022-ab5e-669e27c853a8" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.80-ssec.4-def.existingoverlandflowworks" guid="_0ac3426b-0c9b-4137-9fde-b3bd45308d5f" type="definition">existing overland flow works</defterm> includes works that—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.80-ssec.4-def.existingoverlandflowworks-para1.a" guid="_ccc5e56a-c319-4488-8755-8d7c3c4f5e81" provision.type="other"><no>(a)</no><block><txt break.before="0">are a reconfiguration of existing overland flow works (the <defterm id="sec.80-ssec.4-def.existingoverlandflowworks-def.originalworks" guid="_ba4357a9-4283-466e-98f2-a0d5bc0553c4" type="definition">original works</defterm>); and</txt></block></li><li id="sec.80-ssec.4-def.existingoverlandflowworks-para1.b" guid="_6ed948c0-1a1d-47e7-b0a7-74bf85a13914" provision.type="other"><no>(b)</no><block><txt break.before="0">do not increase the average annual volume of water taken above the average annual volume taken using the original works.</txt></block></li></list></definition></deflist></block></subclause></clause><clause id="sec.81" guid="_2432c613-24a1-4b8f-bb7a-f9e161b901a6" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>81</no><heading id="sec.81-he" guid="_fcc8e705-d610-4c66-b538-827117a9ede6">Granting or amending water licences under the resource operations plan</heading><subclause id="sec.81-ssec.1" guid="_fd8c3fcf-594a-40eb-a805-34dac47d4030" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the resource operations plan states a process for—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.81-ssec.1-para1.a" guid="_009493da-fe54-44cd-9ccf-581aa3562cf9" provision.type="other"><no>(a)</no><block><txt break.before="0">granting, under <legref jurisd="QLD" type="act" refid="sec.212" target.doc.id="UNKNOWN" check="invalid">section&#160;212</legref> of the <legref jurisd="QLD" type="act" target.doc.id="UNKNOWN" check="invalid">Act</legref>, a water licence to replace an authority under <intref refid="sec.28-he" target.guid="_1900aff6-1eae-40f8-a720-af9e4d61b325" check="valid">section&#160;80</intref><intref refid="sec.28-he" target.guid="_c70145ee-1f40-4a87-a13c-5a985a4e3ab8" check="valid">(3)</intref>; or</txt></block></li><li id="sec.81-ssec.1-para1.b" guid="_e23a925b-d9d1-40db-bed6-7611ada5ec88" provision.type="other"><no>(b)</no><block><txt break.before="0">amending a water licence mentioned in paragraph (a).</txt></block></li></list></block></subclause><subclause id="sec.81-ssec.2" guid="_a5af79e2-865d-4096-aaf1-e674a7b8c542" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">In following the process and granting or amending a water licence, the chief executive—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.81-ssec.2-para1.a" guid="_deb03419-ddd7-4faf-b96e-e56b2334bf33" provision.type="other"><no>(a)</no><block><txt break.before="0">must consider—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.81-ssec.2-para1.a-para2.i" guid="_5e544508-f4d9-44f7-8d23-33cdc9e49a83" provision.type="other"><no>(i)</no><block><txt break.before="0">the average annual volume of overland flow water that could have been taken, immediately before the commencement of this plan, using the existing overland flow works to which the authority relates; and</txt></block></li><li id="sec.81-ssec.2-para1.a-para2.ii" guid="_1a65b9b9-adb8-43b8-94d4-ffc4e3718564" provision.type="other"><no>(ii)</no><block><txt break.before="0">the annual volumes of overland flow water estimated by the chief executive to have been taken using the works during the period, of not more than 10 years, immediately before the commencement; and</txt></block></li></list></block></li><li id="sec.81-ssec.2-para1.b" guid="_46f25a54-0418-4ad6-a40c-c6f121fde9a5" provision.type="other"><no>(b)</no><block><txt break.before="0">may consider the extent to which the works, immediately before the commencement, allowed—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.81-ssec.2-para1.b-para2.i" guid="_734d6b5a-0958-47a1-80a0-c7f5e8e2b990" provision.type="other"><no>(i)</no><block><txt break.before="0">the taking of other water under another authorisation; or</txt></block></li><li id="sec.81-ssec.2-para1.b-para2.ii" guid="_71921854-e784-4baf-a7bf-0c77c35726e7" provision.type="other"><no>(ii)</no><block><txt break.before="0">the storage of other water taken under another authorisation.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.81-ssec.3" guid="_b92d286a-0409-4810-b6a2-bf4e056f5cd5" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0"><intref refid="sec.28-he" target.guid="_a5af79e2-865d-4096-aaf1-e674a7b8c542" check="valid">Subsection&#160;(2)</intref> does not limit the matters the chief executive may consider.</txt></block></subclause><subclause id="sec.81-ssec.4" guid="_cbd35af2-0224-4f6a-a6b8-8aa77e9ecb77" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">The process must provide that the chief executive may require the authority or licence holder to give the chief executive a certificate, from a registered professional engineer, stating information about the works including the capacity of the works and the rate at which the works may take water.</txt></block></subclause></clause></division><division id="pt.5-div.9" guid="_77c531ed-c252-4c33-ac11-d1044d1b2510" affected.by.uncommenced="0" numbering.style="manual"><no>Division 9</no><heading id="pt.5-div.9-he" guid="_139c7772-e473-4e72-b8f1-225ffc8a2855">Relationship with Sustainable Planning Act 2009</heading><historynote><txt break.before="1"><b>div hdg</b> amd <legref jurisd="QLD" type="act" target.doc.id="sl-2009-0280" target.version.series="733c849a-1ebf-43d1-8c69-932e3c2fa135" valid.date="as.made" check="valid">2009 SL&#160;No.&#160;280</legref><legref jurisd="QLD" type="act" refid="sec.156" target.doc.id="sl-2009-0280" valid.date="as.made" check="invalid">s&#160;156</legref></txt></historynote><clause id="sec.82" guid="_ea0eb13b-ffe9-46cb-9a78-13e7e71726fa" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>82</no><heading id="sec.82-he" guid="_d95b99a7-8cc7-42e5-a5f4-20b61ee0fd32">Works for taking overland flow water</heading><subclause id="sec.82-ssec.1" guid="_be50d5d2-564f-4045-aebe-7d4a3c90e1a0" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">Works that allow the taking of overland flow water are assessable development for the <legref jurisd="QLD" type="act" target.doc.id="sl-2009-0280" target.version.series="733c849a-1ebf-43d1-8c69-932e3c2fa135" check="valid"><name emphasis="yes">Sustainable Planning Regulation 2009</name></legref>, <legref jurisd="QLD" type="act" refid="sch.3" target.doc.id="sl-2009-0280" target.version.series="733c849a-1ebf-43d1-8c69-932e3c2fa135" check="invalid">schedule&#160;3</legref>, part 1, table 4, item 3(f).</txt></block></subclause><subclause id="sec.82-ssec.2" guid="_acaa98a6-4840-4247-9138-8f5787cf92a5" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref refid="sec.28-he" target.guid="_be50d5d2-564f-4045-aebe-7d4a3c90e1a0" check="valid">Subsection&#160;(1)</intref> does not apply to—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.82-ssec.2-para1.a" guid="_bceae035-6328-48f7-8ee1-3a43da5d71ae" provision.type="other"><no>(a)</no><block><txt break.before="0">works mentioned in <intref refid="sec.28-he" target.guid="_a2255ea1-3267-44db-bd77-93897ab68559" check="valid">subsection&#160;(3)</intref>; or</txt></block></li><li id="sec.82-ssec.2-para1.b" guid="_41929451-e02b-44b4-902c-ce42357ffd1f" provision.type="other"><no>(b)</no><block><txt break.before="0">the repair or maintenance of either of the following works if the repair or maintenance does not alter the design of the works—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.82-ssec.2-para1.b-para2.i" guid="_6651d422-2f7a-4b10-851d-99be7ba16086" provision.type="other"><no>(i)</no><block><txt break.before="0">works to which <intref refid="sec.28-he" target.guid="_1900aff6-1eae-40f8-a720-af9e4d61b325" check="valid">section&#160;80</intref> applies;</txt></block></li><li id="sec.82-ssec.2-para1.b-para2.ii" guid="_c10018c7-edad-4238-b4a3-e7a042dc7b23" provision.type="other"><no>(ii)</no><block><txt break.before="0">works constructed under a development permit.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.82-ssec.3" guid="_a2255ea1-3267-44db-bd77-93897ab68559" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The following works that allow the taking of overland flow water are self-assessable development for the <legref jurisd="QLD" type="act" target.doc.id="sl-2009-0280" target.version.series="733c849a-1ebf-43d1-8c69-932e3c2fa135" check="valid"><name emphasis="yes">Sustainable Planning Regulation 2009</name></legref>, <legref jurisd="QLD" type="act" refid="sch.3" target.doc.id="sl-2009-0280" target.version.series="733c849a-1ebf-43d1-8c69-932e3c2fa135" check="invalid">schedule&#160;3</legref>, part 2, table 4, item 1(e)—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.82-ssec.3-para1.a" guid="_21a477b8-eb91-4749-b82a-3a920570326f" provision.type="other"><no>(a)</no><block><txt break.before="0">works for taking overland flow water only for stock or domestic purposes;</txt></block></li><li id="sec.82-ssec.3-para1.b" guid="_2faaf977-d90c-4eab-a7e0-79ce2d45af83" provision.type="other"><no>(b)</no><block><txt break.before="0">works mentioned in <intref refid="sec.28-he" target.guid="_6d180080-38e9-43dd-9fb4-1c9897e83c25" check="valid">section&#160;79</intref><intref refid="sec.28-he" target.guid="_899b592b-2fe6-4493-9fcf-947c5ab0711a" check="valid">(1)</intref><intref refid="sec.28-he" target.guid="_c042466d-dc15-46d3-9868-7f6443facc95" check="valid">(b)</intref>;</txt></block></li><li id="sec.82-ssec.3-para1.c" guid="_01c19cd3-6756-4d6c-b726-039801aafb2b" provision.type="other"><no>(c)</no><block><txt break.before="0">works for taking only the overland flow water mentioned in <intref refid="sec.28-he" target.guid="_6d180080-38e9-43dd-9fb4-1c9897e83c25" check="valid">section&#160;79</intref><intref refid="sec.28-he" target.guid="_899b592b-2fe6-4493-9fcf-947c5ab0711a" check="valid">(1)</intref><intref refid="sec.28-he" target.guid="_d076f88f-8f02-41c1-8dc9-65a22a535ff9" check="valid">(d)</intref>.</txt></block></li></list></block></subclause><historynote><txt break.before="1"><b><intref refid="sec.28-he" target.guid="_ea0eb13b-ffe9-46cb-9a78-13e7e71726fa" check="valid">s&#160;82</intref></b> amd <legref jurisd="QLD" type="act" target.doc.id="sl-2009-0280" target.version.series="733c849a-1ebf-43d1-8c69-932e3c2fa135" valid.date="as.made" check="valid">2009 SL&#160;No.&#160;280</legref><legref jurisd="QLD" type="act" refid="sec.157" target.doc.id="sl-2009-0280" valid.date="as.made" check="invalid">s&#160;157</legref>; <legref jurisd="QLD" type="act" target.doc.id="act-2011-040" target.version.series="46ca3110-4b45-4657-83a2-6ee1ba4ab16b" valid.date="as.made" check="valid">2011 Act&#160;No.&#160;40</legref><legref jurisd="QLD" type="act" refid="sec.107" target.doc.id="act-2011-040" valid.date="as.made" check="invalid">s&#160;107</legref> sch</txt></historynote></clause><clause id="sec.82A" guid="_9b465ffe-c4de-4b3d-9b81-bc04f76f29ef" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>82A</no><heading id="sec.82A-he" guid="_465f671b-41cb-436a-9b34-369ae5c29fd0">Particular works for interfering with water in the Burdekin Haughton Water Supply Scheme</heading><subclause id="sec.82A-ssec.1" guid="_ed12680a-0012-484d-b149-7ef77de9f2b3" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">Works that are earth dams in the Burdekin Haughton Water Supply Scheme that interfere with water in a watercourse, lake or spring by impounding the flow of water are self-assessable development for the <legref jurisd="QLD" type="act" target.doc.id="sl-2009-0280" target.version.series="733c849a-1ebf-43d1-8c69-932e3c2fa135" check="valid"><name emphasis="yes">Sustainable Planning Regulation 2009</name></legref>, <legref jurisd="QLD" type="act" refid="sch.3" target.doc.id="sl-2009-0280" target.version.series="733c849a-1ebf-43d1-8c69-932e3c2fa135" check="invalid">schedule&#160;3</legref>, part 2, table 4, item 1(b)(i).</txt></block></subclause><subclause id="sec.82A-ssec.2" guid="_89bdb286-d8f2-4363-87a4-d0edc56273cd" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sec.82A-ssec.2-def.earthdam_" guid="_96a8cff7-2479-40b7-a955-99d7166a2e54" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.82A-ssec.2-def.earthdam" guid="_d6cc7fa0-bf9e-41d0-97a3-d633f0c03309" type="definition">earth dam</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.82A-ssec.2-def.earthdam-para1.1" guid="_d4c3d548-0d01-40a1-a435-10cf47c2ed52" provision.type="other"><no>1</no><block><txt break.before="0"><defterm guid="_8df3b79b-e411-456a-b168-d5735388c37d" type="mention">Earth dam</defterm> means works that are a temporary barrier, made of earth, sand or rock, for impounding water, whether or not the barrier has a core of impervious material.</txt></block></li><li id="sec.82A-ssec.2-def.earthdam-para1.2" guid="_47b2a304-562f-4a31-9088-2bb38ba61e18" provision.type="other"><no>2</no><block><txt break.before="0">The term includes—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.82A-ssec.2-def.earthdam-para1.2-para2.a" guid="_dbe627b6-d6d3-4974-8460-bc9f3ccd1941" provision.type="other"><no>(a)</no><block><txt break.before="0">the storage area created by the works mentioned in paragraph 1; and</txt></block></li><li id="sec.82A-ssec.2-def.earthdam-para1.2-para2.b" guid="_5b7aecdf-972f-4c91-b167-7069ef86cb7e" provision.type="other"><no>(b)</no><block><txt break.before="0">an embankment or other structure that controls the flow of water and is incidental to the works mentioned in paragraph 1; and</txt></block></li><li id="sec.82A-ssec.2-def.earthdam-para1.2-para2.c" guid="_d903a825-51cf-4d53-bfdd-7aaa367d665e" provision.type="other"><no>(c)</no><block><txt break.before="0">works made of earth, sand or rock and associated with the dam.</txt></block></li></list></block></li></list></definition></deflist></block></subclause><historynote><txt break.before="1"><b><intref refid="sec.28-he" target.guid="_9b465ffe-c4de-4b3d-9b81-bc04f76f29ef" check="valid">s&#160;82A</intref></b> ins <legref jurisd="QLD" type="act" target.doc.id="sl-2010-0261" target.version.series="75bd0fce-73a3-4b50-9bd8-ec62a86126b5" valid.date="as.made" check="valid">2010 SL&#160;No.&#160;261</legref><legref jurisd="QLD" type="act" refid="sec.3" target.doc.id="sl-2010-0261" valid.date="as.made" check="invalid">s&#160;3</legref></txt></historynote></clause></division></part><part id="pt.6" guid="_29ed3188-bf9f-4052-a7b4-45d1d9fcf07d" affected.by.uncommenced="0" numbering.style="manual"><no>Part 6</no><heading id="pt.6-he" guid="_4d0c9b06-44d3-4a7c-ac14-6adf94e806d1">Monitoring and reporting requirements</heading><historynote><txt break.before="1"><b>pt hdg</b> sub <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.49" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;49</legref></txt></historynote><clause id="sec.83" guid="_e126a652-53fd-4795-a4e5-2be10d9a8d77" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>83</no><heading id="sec.83-he" guid="_7b8c1e54-a203-42a2-adf2-4dce8287f377">Monitoring and reporting requirements</heading><subclause id="sec.83-ssec.1" guid="_f8c11acb-a91c-4fce-847a-d92f4460e157" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">To help the Minister assess the effectiveness of the management strategies for achieving the outcomes mentioned in part 3, the resource operations plan must state—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.83-ssec.1-para1.a" guid="_e494fb20-82d6-4824-ba77-a6a02d5a1994" provision.type="other"><no>(a)</no><block><txt break.before="0">the monitoring requirements for water and natural ecosystems for this plan; and</txt></block></li><li id="sec.83-ssec.1-para1.b" guid="_3e2add56-6572-4dcc-9e1d-0c0e7671287a" provision.type="other"><no>(b)</no><block><txt break.before="0">the reporting requirements for this plan for operators of infrastructure interfering with water in the plan area.</txt></block></li></list></block></subclause><subclause id="sec.83-ssec.2" guid="_80222666-47c9-47ee-9706-53f1e4c5245d" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref refid="sec.28-he" target.guid="_f8c11acb-a91c-4fce-847a-d92f4460e157" check="valid">Subsection&#160;(1)</intref> does not limit the monitoring requirements the chief executive may impose for this plan.</txt></block></subclause><historynote><txt break.before="1"><b><intref refid="sec.28-he" target.guid="_e126a652-53fd-4795-a4e5-2be10d9a8d77" check="valid">s&#160;83</intref></b> sub <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.49" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;49</legref></txt></historynote></clause><clause id="sec.84" guid="_f1b3a4b1-fe9a-40f8-9df5-5a7cb8fe93ef" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>84</no><heading id="sec.84-he" guid="_64540be0-31e2-4e04-b609-b73a60795a2a">Minister’s report on plan—<legref jurisd="QLD" type="act" target.doc.id="UNKNOWN" check="invalid">Act</legref>, <intref refid="sec.28-he" target.guid="_0b5d8fab-2363-4533-8f26-61a82264ec50" check="valid">s&#160;53</intref></heading><subclause id="sec.84-ssec.1" guid="_aa24d3e1-f0b4-45e6-9038-dbec84211bca" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister’s report on this plan must be prepared for a period (the <defterm id="sec.84-def.reportingperiod" guid="_9e8d92a9-b0d1-48a3-9764-e546604ee53a" type="definition">reporting period</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.84-ssec.1-para1.a" guid="_00388e0f-8b95-41d1-ac4e-1b9e7807570b" provision.type="other"><no>(a)</no><block><txt break.before="0">starting on the commencement of this plan; and</txt></block></li><li id="sec.84-ssec.1-para1.b" guid="_a6ac10e8-27cc-4a04-ad4e-ee8e3010de29" provision.type="other"><no>(b)</no><block><txt break.before="0">ending within 5 years—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.84-ssec.1-para1.b-para2.i" guid="_0f6beade-9007-4a18-92d9-ebe20bde5a8d" provision.type="other"><no>(i)</no><block><txt break.before="0">for the first report—after the beginning of the financial year in which this plan commenced; and</txt></block></li><li id="sec.84-ssec.1-para1.b-para2.ii" guid="_ec163c2e-40e8-4a95-bfd2-2e111e303f70" provision.type="other"><no>(ii)</no><block><txt break.before="0">for subsequent reports—after the end of the previous reporting period.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.84-ssec.2" guid="_b590b591-381b-465a-a6f9-204f3d35e51d" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister’s report must be prepared within 12 months after the end of the reporting period to which the report relates.</txt></block></subclause><subclause id="sec.84-ssec.3" guid="_fb948c8a-aba1-4309-8e02-66d99958b11a" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sec.84-ssec.3-def.previousreportingperiod_" guid="_8709627b-9813-4517-b996-ca0919fb6d81" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.84-ssec.3-def.previousreportingperiod" guid="_a126b85d-addb-4890-b75f-2d541446f721" type="definition">previous reporting period</defterm>, in relation to a reporting period, means the reporting period immediately preceding the reporting period.</txt></definition></deflist></block></subclause><historynote><txt break.before="1"><b><intref refid="sec.28-he" target.guid="_f1b3a4b1-fe9a-40f8-9df5-5a7cb8fe93ef" check="valid">s&#160;84</intref></b> sub <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.49" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;49</legref></txt></historynote></clause><clause id="sec.85" guid="_c9af4b42-583f-428e-9e1c-548c73c90954" status="repealed" affected.by.uncommenced="0" spent.amends="0" provision.type="other" toc="no"><no>85</no><heading id="sec.85-he" guid="_64f57840-e1e3-4f62-ad23-eefd279080f3">Operators of infrastructure to give reports</heading><repealed><repealedtxt/></repealed><historynote><txt break.before="1"><b><intref refid="sec.28-he" target.guid="_c9af4b42-583f-428e-9e1c-548c73c90954" check="valid">s&#160;85</intref></b> om <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.49" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;49</legref></txt></historynote></clause><clause id="sec.86" guid="_ebc7a9f1-51b4-48f4-9c24-c18c28f6d7df" status="repealed" affected.by.uncommenced="0" spent.amends="0" provision.type="other" toc="no"><no>86</no><heading id="sec.86-he" guid="_42710a3b-d9f3-40f4-a1ad-32402e5be814">Minister’s report on plan—<legref jurisd="QLD" type="act" target.doc.id="UNKNOWN" check="invalid">Act</legref>, <intref refid="sec.28-he" target.guid="_0b5d8fab-2363-4533-8f26-61a82264ec50" check="valid">s&#160;53</intref></heading><repealed><repealedtxt/></repealed><historynote><txt break.before="1"><b><intref refid="sec.28-he" target.guid="_ebc7a9f1-51b4-48f4-9c24-c18c28f6d7df" check="valid">s&#160;86</intref></b> om <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.49" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;49</legref></txt></historynote></clause></part><part id="pt.7" guid="_009c3cc0-490a-4939-aa70-794d9df90a39" affected.by.uncommenced="0" numbering.style="manual"><no>Part 7</no><heading id="pt.7-he" guid="_dcc5c7d8-e9ba-4bba-8e75-5a3b462557ab">Implementing and amending this plan</heading><clause id="sec.87" guid="_dee66b0f-b001-4e76-9cdf-6f48b0f9aa37" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>87</no><heading id="sec.87-he" guid="_cd120881-cfd4-406a-9f2c-c8423a9ad51e">Implementation schedule</heading><subclause id="sec.87-ssec.1" guid="_2230afd8-ae70-4ce6-84b7-284abab4691a" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section states the proposed arrangements for implementing this plan.</txt></block></subclause><subclause id="sec.87-ssec.2" guid="_3d9580cc-15aa-4a33-8d9c-a0e5605f670b" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">Within 1 year after the commencement of this plan, it is proposed to prepare a resource operations plan—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.87-ssec.2-para1.a" guid="_01975e69-629d-42de-a1a5-98d4d9ad3cfb" provision.type="other"><no>(a)</no><block><txt break.before="0">to grant and convert authorisations mentioned in <intref refid="sec.28-he" target.guid="_85f9f581-6d41-4b28-a62b-89a523244788" check="valid">section&#160;62</intref> in the Burdekin Haughton Water Supply Scheme and the Bowen Broken Water Supply Scheme to water allocations; and</txt></block></li><li id="sec.87-ssec.2-para1.b" guid="_5aaebb3a-a58d-4682-96cb-88f7212fe072" provision.type="other"><no>(b)</no><block><txt break.before="0">for water in the Burdekin Haughton Water Supply Scheme and the Bowen Broken Water Supply Scheme—to make environmental management rules, infrastructure operating rules, water sharing rules, water allocation change rules and seasonal water assignment rules; and</txt></block></li><li id="sec.87-ssec.2-para1.c" guid="_02464226-abfe-47d3-b50e-5205674039ad" provision.type="other"><no>(c)</no><block><txt break.before="0">to establish a process to deal with unallocated water available for future water requirements in the plan area; and</txt></block></li><li id="sec.87-ssec.2-para1.d" guid="_f4abec63-d2cc-4600-82ae-31666ee0be79" provision.type="other"><no>(d)</no><block><txt break.before="0">to establish a process for granting or amending water licences to take overland flow water; and</txt></block></li><li id="sec.87-ssec.2-para1.e" guid="_e65c38e6-9f61-4778-9cd7-5ec55a0209fa" provision.type="other"><no>(e)</no><block><txt break.before="0">to implement the monitoring requirements mentioned in part 6.</txt></block></li></list></block></subclause><historynote><txt break.before="1"><b><intref refid="sec.28-he" target.guid="_dee66b0f-b001-4e76-9cdf-6f48b0f9aa37" check="valid">s&#160;87</intref></b> amd <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.50" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;50</legref></txt></historynote></clause><clause id="sec.88" guid="_56d392be-9c27-4660-bfa1-d1cf6b68cf6b" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>88</no><heading id="sec.88-he" guid="_8ed18069-c411-4ae7-8731-e50285e74b9c">Minor or stated amendment of plan—<legref jurisd="QLD" type="act" target.doc.id="UNKNOWN" check="invalid">Act</legref>, <intref refid="sec.28-he" target.guid="_8b9ca033-7366-4e04-bdbf-d115d5b9a680" check="valid">s&#160;57</intref></heading><subclause id="sec.88-ssec.1" guid="_97bcce06-148a-40db-86c5-ff4122515c9d" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The following types of amendment may be made to this plan under <intref refid="sec.28-he" target.guid="_8b9ca033-7366-4e04-bdbf-d115d5b9a680" check="valid">section&#160;57</intref><legref jurisd="QLD" type="act" refid="sec.57-para1.b" target.doc.id="UNKNOWN" check="invalid">(b)</legref> of the <legref jurisd="QLD" type="act" target.doc.id="UNKNOWN" check="invalid">Act</legref>—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.88-ssec.1-para1.a" guid="_54f1209b-c05e-4b1c-9b01-79246b96fa94" provision.type="other"><no>(a)</no><block><txt break.before="0">an amendment or addition of an environmental flow objective if the amendment or addition achieves an equivalent or improved ecological outcome without adversely affecting the water allocation security objectives or the outcomes under part 3;</txt></block></li><li id="sec.88-ssec.1-para1.b" guid="_fdbc8237-507d-421c-b5e6-e08b0a8978fb" provision.type="other"><no>(b)</no><block><txt break.before="0">an amendment or addition of a water allocation security objective if the amendment or addition does not adversely affect existing water allocations, environmental flow objectives or the outcomes under part 3;</txt></block></li><li id="sec.88-ssec.1-para1.c" guid="_cfe43dd9-9899-42ce-aee6-a0fca2a19d26" provision.type="other"><no>(c)</no><block><txt break.before="0">an amendment or addition of a node;</txt></block></li><li id="sec.88-ssec.1-para1.d" guid="_50709314-1f9d-4cc4-89e9-0a0206b4c2f3" provision.type="other"><no>(d)</no><block><txt break.before="0">an amendment to subdivide a subcatchment area;</txt></block></li><li id="sec.88-ssec.1-para1.e" guid="_baa66e40-fbc0-4599-a256-8a139bf40141" provision.type="other"><no>(e)</no><block><txt break.before="0">an amendment or addition of a priority group;</txt></block></li><li id="sec.88-ssec.1-para1.f" guid="_83c4b48d-70b1-47fe-a1bf-8ab4fc771c93" provision.type="other"><no>(f)</no><block><txt break.before="0">an amendment or addition of a water management area;</txt></block></li><li id="sec.88-ssec.1-para1.g" guid="_04fd6b99-46b5-48d9-a368-6ec234fe7c94" provision.type="other"><no>(g)</no><block><txt break.before="0">an amendment or addition of a water allocation group;</txt></block></li><li id="sec.88-ssec.1-para1.h" guid="_d7b767db-e77d-4227-a356-d49c5e6dd89c" provision.type="other"><no>(h)</no><block><txt break.before="0">an amendment of the capacity mentioned in <intref refid="sec.28-he" target.guid="_6d180080-38e9-43dd-9fb4-1c9897e83c25" check="valid">section&#160;79</intref><intref refid="sec.28-he" target.guid="_899b592b-2fe6-4493-9fcf-947c5ab0711a" check="valid">(1)</intref><intref refid="sec.28-he" target.guid="_c042466d-dc15-46d3-9868-7f6443facc95" check="valid">(b)</intref>;</txt></block></li><li id="sec.88-ssec.1-para1.i" guid="_8f85c15f-5650-48f5-88b8-465127bb7019" provision.type="other"><no>(i)</no><block><txt break.before="0">an amendment to state that works that are earth dams in the Burdekin Haughton Water Supply Scheme that interfere with, or increase the interference with, water in a watercourse, waterhole, lake or spring by impounding the flow of water are self-assessable development under the for the <legref jurisd="QLD" type="act" target.doc.id="sl-2009-0280" target.version.series="733c849a-1ebf-43d1-8c69-932e3c2fa135" check="valid"><name emphasis="yes">Sustainable Planning Regulation 2009</name></legref>, <legref jurisd="QLD" type="act" refid="sch.3" target.doc.id="sl-2009-0280" target.version.series="733c849a-1ebf-43d1-8c69-932e3c2fa135" check="invalid">schedule&#160;3</legref>, part 2, table 4, item 1(b)(i);</txt></block></li><li id="sec.88-ssec.1-para1.j" guid="_00f6e29a-784a-434f-b349-42a807f4c99f" provision.type="other"><no>(j)</no><block><txt break.before="0">an amendment or addition of a monitoring or reporting requirement mentioned in part 6.</txt></block></li></list></block></subclause><subclause id="sec.88-ssec.2" guid="_263cae0b-1b7b-4b77-a2e6-34532e3cd154" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref refid="sec.28-he" target.guid="_97bcce06-148a-40db-86c5-ff4122515c9d" check="valid">Subsection&#160;(1)</intref><intref refid="sec.28-he" target.guid="_8f85c15f-5650-48f5-88b8-465127bb7019" check="valid">(i)</intref> applies only if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.88-ssec.2-para1.a" guid="_f6c20cbf-bd9f-40a4-8f6e-62eec055acb7" provision.type="other"><no>(a)</no><block><txt break.before="0">the <legref jurisd="QLD" type="act" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" check="valid"><name emphasis="yes">Water Act 2000</name></legref>, <legref jurisd="QLD" type="act" refid="sec.46" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" check="invalid">section&#160;46</legref><legref jurisd="QLD" type="act" refid="sec.46-ssec.2" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" check="invalid">(2)</legref>, allows a draft plan to include, as types of works that are intended to be self-assessable development under the <legref jurisd="QLD" type="act" target.doc.id="act-2009-036" target.version.series="5fd7889b-781a-42b2-9bea-5447a89bf2be" check="valid"><name emphasis="yes">Sustainable Planning Act 2009</name></legref>, works that are earth dams that interfere with, or increase the interference with, water in a watercourse, waterhole, lake or spring by impounding the flow of water; and</txt></block></li><li id="sec.88-ssec.2-para1.b" guid="_6de446be-f169-4794-9ba5-5e4ef1699e12" provision.type="other"><no>(b)</no><block><txt break.before="0">the <legref jurisd="QLD" type="act" target.doc.id="sl-2009-0280" target.version.series="733c849a-1ebf-43d1-8c69-932e3c2fa135" check="valid"><name emphasis="yes">Sustainable Planning Regulation 2009</name></legref>, <legref jurisd="QLD" type="act" refid="sch.3" target.doc.id="sl-2009-0280" target.version.series="733c849a-1ebf-43d1-8c69-932e3c2fa135" check="invalid">schedule&#160;3</legref>, part 2, table 4, item 1(b)(i), includes operational work that is an earth dam if the work allows interfering with, or increasing the interference with, water in a watercourse, waterhole, lake or spring by impounding the flow of water.</txt></block></li></list></block></subclause><historynote><txt break.before="1"><b><intref refid="sec.28-he" target.guid="_56d392be-9c27-4660-bfa1-d1cf6b68cf6b" check="valid">s&#160;88</intref></b> amd <legref jurisd="QLD" type="act" target.doc.id="sl-2009-0280" target.version.series="733c849a-1ebf-43d1-8c69-932e3c2fa135" valid.date="as.made" check="valid">2009 SL&#160;No.&#160;280</legref><legref jurisd="QLD" type="act" refid="sec.158" target.doc.id="sl-2009-0280" valid.date="as.made" check="invalid">s&#160;158</legref>; <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref><legref jurisd="QLD" type="act" refid="sec.51" target.doc.id="sl-2014-0142" valid.date="as.made" check="invalid">s&#160;51</legref></txt></historynote></clause><clause id="sec.89" guid="_87fb8a5d-fdd5-427e-a697-c13f75935182" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>89</no><heading id="sec.89-he" guid="_d178bc96-11f7-4c13-b8a7-53af43626fa7">Amending or replacing plan</heading><block><txt break.before="1">The Minister must consider amending this plan or preparing a new plan to replace this plan if the Minister is satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.89-para1.a" guid="_ca60b873-d7ae-469e-9905-9960c2be6867" provision.type="other"><no>(a)</no><block><txt break.before="0">in relation to this plan’s general outcomes under <intref refid="sec.28-he" target.guid="_0660a958-b10e-43c6-85e2-6c7a8a6183af" check="valid">section&#160;12</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.89-para1.a-para2.i" guid="_1e5a9d6c-d35d-45ff-85b3-6b710f927f37" provision.type="other"><no>(i)</no><block><txt break.before="0">water entitlements in the plan area are not sufficient to meet water needs sourced from the plan area having regard to—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.89-para1.a-para2.i-para3.A" guid="_e70860e7-ed7e-4c6e-8c86-bfc8dde6ca74" provision.type="other"><no>(A)</no><block><txt break.before="0">the extent to which water is being taken under the water entitlements; and</txt></block></li><li id="sec.89-para1.a-para2.i-para3.B" guid="_28e4f3ec-a61e-4a48-b220-f7163ae8a5c6" provision.type="other"><no>(B)</no><block><txt break.before="0">the efficiency of present, and expected future, water use; and</txt></block></li><li id="sec.89-para1.a-para2.i-para3.C" guid="_5a418157-d150-4b14-b553-90b66aea190f" provision.type="other"><no>(C)</no><block><txt break.before="0">emerging requirements for additional water; and</txt></block></li><li id="sec.89-para1.a-para2.i-para3.D" guid="_d3440242-5a72-4910-baad-616da03b7b8b" provision.type="other"><no>(D)</no><block><txt break.before="0">water savings that may be made from improvements in the efficiency of water use or the use of water from other sources including, for example, recycled water; and</txt></block></li><li id="sec.89-para1.a-para2.i-para3.E" guid="_bd2bc92f-0bff-4b6c-8539-237d25fac0ce" provision.type="other"><no>(E)</no><block><txt break.before="0">the likely timeframe in which additional water will be required; and</txt></block></li></list></block></li><li id="sec.89-para1.a-para2.ii" guid="_1b223c25-b55f-4c16-a705-eb2b743a5ea4" provision.type="other"><no>(ii)</no><block><txt break.before="0">there are economically viable and ecologically sustainable uses for additional water; or</txt></block></li></list></block></li><li id="sec.89-para1.b" guid="_ac4a0e98-1ddd-4aac-b403-36ac8c6a5169" provision.type="other"><no>(b)</no><block><txt break.before="0">this plan’s general ecological outcomes under <intref refid="sec.28-he" target.guid="_7d9c654b-3dc1-4df2-883f-134f9f8bc95b" check="valid">section&#160;13</intref> or specific ecological outcomes under <intref refid="sec.28-he" target.guid="_5857f450-ccf9-4a63-a274-6199e2d34449" check="valid">section&#160;14</intref> are not being achieved.</txt></block></li></list></block></clause></part></body></wrapper><schedules affected.by.uncommenced="0" numbering.style="manual"><schedule id="sch.1" guid="_1793060e-0270-499c-9580-309c3f61f941" type="schedule" affected.by.uncommenced="0" spent.amends="0" numbering.style="manual" provision.type="other"><no>Schedule 1</no><heading id="sch.1-he" guid="_bc6f1abc-72d8-47e2-bd2d-0a917e6d1689">Plan area</heading><sourceref id="sch.1-ref" guid="_9766a760-3d4e-4164-bff2-202d96b70170" affected.by.uncommenced="0"><intref refid="sec.28-he" target.guid="_739d9e03-cf00-4b41-953d-c9329807f043" check="valid">sections&#160;4</intref> and <intref refid="sec.28-he" target.guid="_c503b309-e58e-4003-826a-0839853568eb" check="valid">9</intref></sourceref><block><graphicblock id="sch.1-img" guid="_7391f6f7-7939-4c2c-999e-705538402d3b" orientation="portrait" graphic.align="left" margin="fullout"><graphic file.name="R16_1648-G1.tif" height="6.219in" width="4.993in" dpi="300" graphic.align="center"/></graphicblock></block></schedule><schedule id="sch.2" guid="_81f8bca2-a7d8-4d0f-ba6f-016d5d3c5a5a" type="schedule" affected.by.uncommenced="0" spent.amends="0" numbering.style="manual" provision.type="other"><no>Schedule 2</no><heading id="sch.2-he" guid="_db3ebcaa-710d-4615-9eb6-c2a6aa615523">Subcatchment areas</heading><sourceref id="sch.2-ref" guid="_37a901c1-8d1f-4775-beb6-bba2c2068614" affected.by.uncommenced="0"><intref refid="sec.28-he" target.guid="_0979af88-643c-4559-ad00-9482b3b94b5e" check="valid">section&#160;5</intref></sourceref><block><graphicblock id="sch.2-img" guid="_fd788c24-f4a6-4241-923d-1468dbb0e33c" orientation="portrait" graphic.align="left" margin="fullout"><graphic file.name="R16_1648-G2.tif" height="6.283in" width="4.773in" dpi="300" graphic.align="center"/></graphicblock></block></schedule><schedule id="sch.3" guid="_ad843ccb-94e9-426f-8612-659786e1a1be" type="schedule" affected.by.uncommenced="0" spent.amends="0" numbering.style="manual" provision.type="other"><no>Schedule 3</no><heading id="sch.3-he" guid="_6320ced0-d52d-422a-b34b-7e84a025019b">Giru Benefited Groundwater Area</heading><sourceref id="sch.3-ref" guid="_ba9d8b60-86b4-4b85-b3be-e8ab1148724e" affected.by.uncommenced="0"><intref refid="sec.28-he" target.guid="_cbdb4cdc-0d8a-4a18-b300-4262a3a0e1df" check="valid">section&#160;7</intref></sourceref><block><graphicblock id="sch.3-img" guid="_625dae3d-49af-492d-bf46-3911b09948b3" orientation="portrait" graphic.align="left" margin="fullout"><graphic file.name="R16_1648-G3.tif" height="6.017in" width="4.493in" dpi="300" graphic.align="center"/></graphicblock></block></schedule><schedule id="sch.4" guid="_222ef798-e220-4426-ae02-8dd2ed95eb76" type="schedule" affected.by.uncommenced="0" spent.amends="0" numbering.style="manual" provision.type="other"><no>Schedule 4</no><heading id="sch.4-he" guid="_069153ac-5094-435f-9fa4-63ee79bb679c">Nodes</heading><sourceref id="sch.4-ref" guid="_bdc2aef2-257c-467a-bb99-bde64025870e" affected.by.uncommenced="0"><intref refid="sec.28-he" target.guid="_c503b309-e58e-4003-826a-0839853568eb" check="valid">section&#160;9</intref></sourceref><block><table frame="all" colsep="0" rowsep="0" orient="port" id="sch.4-tbl" guid="_90394d4e-26f3-4e5c-8028-d36143b0b00e" heading.align="left" font.size="12.pt"><tgroup cols="2" colsep="0" rowsep="0" tgroupstyle="2columnRuled"><colspec colnum="1" colname="1" colwidth="0.941in" colsep="0"/><colspec colnum="2" colname="2" colwidth="4.059in" colsep="0"/><thead><row rowsep="0" id="sch.4-tbl-tblh-tblr" guid="_b5df0345-7106-436b-a352-58b4ad47c406"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblh-tblr-tble1" guid="_cb65644f-73ce-4280-84bc-ffc2dc0e6f37"><block><txt break.before="1"><b>Column 1</b></txt></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblh-tblr-tble2" guid="_e9ba745d-0da2-4490-bbc0-ef52612a149d"><block><txt break.before="1"><b>Column 2</b></txt></block></entry></row><row rowsep="0" id="sch.4-tbl-tblh-tblr-oc.2" guid="_87d359c3-38a5-416a-b325-6cf3eeb76924"><entry colname="1" colsep="1" align="left" valign="top" id="sch.4-tbl-tblh-tblr-oc.2-tble1" guid="_91a29512-d872-4d5c-a5db-ebc975377d61"><block><txt break.before="1"><b>Node</b></txt></block></entry><entry colname="2" align="left" valign="top" id="sch.4-tbl-tblh-tblr-oc.2-tble2" guid="_c50b0935-7efa-4786-bd99-5d4f3c7fd900"><block><txt break.before="1"><b>Location</b></txt></block></entry></row></thead><tbody><row rowsep="0" id="sch.4-tbl-tblr" guid="_9670457f-d63f-487f-bcf6-85605d919628"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblr-tble1" guid="_e52c2c6c-8b10-49da-b1f5-2adf3f1a67f5"><block><txt break.before="1">1</txt></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblr-tble2" guid="_ca05a7ed-a731-4d7c-9b26-8c4e1b8e4c93"><block><txt break.before="1">Burdekin River at the river’s downstream limit declared under the <legref jurisd="QLD" type="act" target.doc.id="sl-2002-0070" target.version.series="5540f2a6-9dcc-422f-9458-4420a6afd0bd" check="valid"><name emphasis="yes">Water Regulation 2002</name></legref>, <legref jurisd="QLD" type="act" refid="sec.54" target.doc.id="sl-2002-0070" target.version.series="5540f2a6-9dcc-422f-9458-4420a6afd0bd" check="invalid">section&#160;54</legref><legref jurisd="QLD" type="act" refid="sec.54-ssec.1" target.doc.id="sl-2002-0070" target.version.series="5540f2a6-9dcc-422f-9458-4420a6afd0bd" check="invalid">(1)</legref></txt></block></entry></row><row rowsep="0" id="sch.4-tbl-tblr-oc.2" guid="_37cab08e-9177-48da-91b6-e525bb19f886"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblr-oc.2-tble1" guid="_9af067f1-f3d6-4143-a588-de58c08b09d4"><block><txt break.before="1">1A</txt></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblr-oc.2-tble2" guid="_2de38eeb-3796-4ad4-a6ee-d37c29ed89ae"><block><txt break.before="1">Burdekin River anabranch at the anabranch’s downstream limit declared under the <legref jurisd="QLD" type="act" target.doc.id="sl-2002-0070" target.version.series="5540f2a6-9dcc-422f-9458-4420a6afd0bd" check="valid"><name emphasis="yes">Water Regulation 2002</name></legref>, <legref jurisd="QLD" type="act" refid="sec.54" target.doc.id="sl-2002-0070" target.version.series="5540f2a6-9dcc-422f-9458-4420a6afd0bd" check="invalid">section&#160;54</legref><legref jurisd="QLD" type="act" refid="sec.54-ssec.1" target.doc.id="sl-2002-0070" target.version.series="5540f2a6-9dcc-422f-9458-4420a6afd0bd" check="invalid">(1)</legref></txt></block></entry></row><row rowsep="0" id="sch.4-tbl-tblr-oc.3" guid="_fa932ebe-cfaf-4f06-891e-72cd4ec19eeb"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblr-oc.3-tble1" guid="_4ad1c7be-6113-4fdd-9314-52d3efe71e8d"><block><txt break.before="1">2</txt></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblr-oc.3-tble2" guid="_f46b24bf-53d1-488a-96dd-e5a6280690a2"><block><txt break.before="1">Haughton River at the river’s downstream limit declared under the <legref jurisd="QLD" type="act" target.doc.id="sl-2002-0070" target.version.series="5540f2a6-9dcc-422f-9458-4420a6afd0bd" check="valid"><name emphasis="yes">Water Regulation 2002</name></legref>, <legref jurisd="QLD" type="act" refid="sec.54" target.doc.id="sl-2002-0070" target.version.series="5540f2a6-9dcc-422f-9458-4420a6afd0bd" check="invalid">section&#160;54</legref><legref jurisd="QLD" type="act" refid="sec.54-ssec.1" target.doc.id="sl-2002-0070" target.version.series="5540f2a6-9dcc-422f-9458-4420a6afd0bd" check="invalid">(1)</legref></txt></block></entry></row><row rowsep="0" id="sch.4-tbl-tblr-oc.4" guid="_27b3a3d9-af87-4ce8-ad1d-924df279f833"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblr-oc.4-tble1" guid="_f785d955-3e97-4571-91d8-b1cc2722cdf5"><block><txt break.before="1">3</txt></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblr-oc.4-tble2" guid="_6b1b8134-589e-432b-b49a-6d69d6164fe3"><block><txt break.before="1">Haughton River at the supplementation point (AMTD 42km)</txt></block></entry></row><row rowsep="0" id="sch.4-tbl-tblr-oc.5" guid="_83d7786d-af7d-4879-aade-e5e727d221ef"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblr-oc.5-tble1" guid="_7c69a78d-1c10-4f0f-8f6b-cba5dd1c0f0b"><block><txt break.before="1">4</txt></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblr-oc.5-tble2" guid="_b99ae35a-d9bb-4fb6-ab98-4c0119146647"><block><txt break.before="1">Burdekin River at its confluence with the anabranch (AMTD 10km)</txt></block></entry></row><row rowsep="0" id="sch.4-tbl-tblr-oc.6" guid="_fe59ba4b-f2cc-402c-a79d-b45f8ca14673"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblr-oc.6-tble1" guid="_1fcc395f-bba6-40dd-a98d-22b151fa09bb"><block><txt break.before="1">5</txt></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblr-oc.6-tble2" guid="_0e06492b-3f34-41a2-97f3-d028d35e44b2"><block><txt break.before="1">Burdekin River at Warren’s Gully (AMTD 34.7km)</txt></block></entry></row><row rowsep="0" id="sch.4-tbl-tblr-oc.7" guid="_a175d149-8462-46a7-a7b4-da42490184ee"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblr-oc.7-tble1" guid="_bcc6f2ab-8c33-4275-ac95-8e764e5f682b"><block><txt break.before="1">6</txt></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblr-oc.7-tble2" guid="_21e85573-b90f-4774-ad26-b5549fefb3ad"><block><txt break.before="1">Burdekin River immediately downstream of Clare Weir (AMTD 50.3km)</txt></block></entry></row><row rowsep="0" id="sch.4-tbl-tblr-oc.8" guid="_64de764b-21c0-4eaa-8d89-dcba735b3df6"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblr-oc.8-tble1" guid="_bec5de29-3b27-4ebb-96dc-a6bef168ec43"><block><txt break.before="1">7</txt></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblr-oc.8-tble2" guid="_d654bccb-2f34-45ce-88ee-5b9b6987b676"><block><txt break.before="1">Burdekin River immediately downstream of Burdekin Falls Dam (AMTD 158.8km)</txt></block></entry></row><row rowsep="0" id="sch.4-tbl-tblr-oc.9" guid="_cb53b1ea-5eba-4fc0-81c2-24a11f4428bf"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblr-oc.9-tble1" guid="_352c078a-7956-424f-a83a-d37f6597c7d3"><block><txt break.before="1">8</txt></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblr-oc.9-tble2" guid="_d77fd377-0d16-4248-a4ba-47659273a29a"><block><txt break.before="1">Burdekin River immediately upstream of its confluence with the Suttor River (AMTD 174.5km)</txt></block></entry></row><row rowsep="0" id="sch.4-tbl-tblr-oc.10" guid="_e57fb3e1-7537-41c5-8ea3-96d89d99d150"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblr-oc.10-tble1" guid="_93da48be-312f-442b-a78f-d9aa507f12d8"><block><txt break.before="1">9</txt></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblr-oc.10-tble2" guid="_5c10470d-3403-4cc2-b654-3f9fef2d151e"><block><txt break.before="1">Burdekin River immediately downstream of Charters Towers Weir (AMTD 317km)</txt></block></entry></row><row rowsep="0" id="sch.4-tbl-tblr-oc.11" guid="_645366a9-eae9-49fd-a7ec-c61c80ee9d59"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblr-oc.11-tble1" guid="_fead5609-2c9a-4a64-91f6-27df32f6ba32"><block><txt break.before="1">10</txt></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblr-oc.11-tble2" guid="_775db8df-5872-4cac-abb1-7800a0efd6e5"><block><txt break.before="1">Cape River at its confluence with the Suttor River (AMTD 0.0km)</txt></block></entry></row><row rowsep="0" id="sch.4-tbl-tblr-oc.12" guid="_0045942e-19a1-4ee2-82e6-aa6c667343df"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblr-oc.12-tble1" guid="_2c801cc2-e92a-4f74-9c4f-59917e5e8696"><block><txt break.before="1">11</txt></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblr-oc.12-tble2" guid="_844ba3a5-7efc-46f5-80c0-562ffdc7bda3"><block><txt break.before="1">Suttor River at its confluence with the Burdekin River (AMTD 0.0km)</txt></block></entry></row><row rowsep="0" id="sch.4-tbl-tblr-oc.13" guid="_159fdcd7-4740-4e59-a7bd-844576977b6c"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblr-oc.13-tble1" guid="_8934c621-a542-4e84-9b29-d14cbbcaa539"><block><txt break.before="1">12</txt></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblr-oc.13-tble2" guid="_c09562ed-dfb0-4187-8773-7ade46352bec"><block><txt break.before="1">Bowen River at the upstream limit of the impounded area of the Blue Valley Weir (AMTD 5.5km)</txt></block></entry></row><row rowsep="0" id="sch.4-tbl-tblr-oc.14" guid="_4d732c7e-d867-4b1a-a284-886d78254717"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblr-oc.14-tble1" guid="_a52e5766-15ad-4abc-8579-4be94f831862"><block><txt break.before="1">13</txt></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4-tbl-tblr-oc.14-tble2" guid="_1da4f1dc-f6b1-4451-a0af-bfcd105fc01b"><block><txt break.before="1">Bowen River immediately downstream of Bowen River Weir (AMTD 94.4km)</txt></block></entry></row><row rowsep="0" id="sch.4-tbl-tblr-oc.15" guid="_a2193401-cdc9-46f7-a50c-61c069a6c4a3"><entry colname="1" colsep="1" align="left" valign="top" id="sch.4-tbl-tblr-oc.15-tble1" guid="_e82e8981-1ebc-4032-9b5e-33c4799b8f94"><block><txt break.before="1">14</txt></block></entry><entry colname="2" align="left" valign="top" id="sch.4-tbl-tblr-oc.15-tble2" guid="_2425179e-4157-4f2e-980d-8d36b62bd1fc"><block><txt break.before="1">Broken River immediately downstream of Eungella Dam (AMTD 71.2km)</txt></block></entry></row></tbody></tgroup></table></block><historynote><txt break.before="1"><b>sch 4 </b>amd <legref jurisd="QLD" type="act" target.doc.id="sl-2010-0261" target.version.series="75bd0fce-73a3-4b50-9bd8-ec62a86126b5" valid.date="as.made" check="valid">2010 SL&#160;No.&#160;261</legref> s 4</txt></historynote></schedule><schedule id="sch.5" guid="_628d66ea-4fad-441f-884e-291ba2eae1e4" type="schedule" affected.by.uncommenced="0" spent.amends="0" numbering.style="manual" provision.type="other"><no>Schedule 5</no><heading id="sch.5-he" guid="_603887c6-916d-4bab-8795-9c8740efd8e1">Environmental flow objectives</heading><sourceref id="sch.5-ref" guid="_9172add2-13b3-47e6-9ec3-c1cc0b2b200c" affected.by.uncommenced="0"><intref refid="sec.28-he" target.guid="_2b8175e5-f871-47a1-9ae5-54a2a95a0318" check="valid">section&#160;16</intref></sourceref><part id="sch.5-pt.1" guid="_5035301d-c3e1-4315-8926-69072e51c654" affected.by.uncommenced="0" numbering.style="manual" toc="no"><no>Part 1</no><heading id="sch.5-pt.1-he" guid="_f2e8303f-58fd-409c-b394-e65e294ad2e2">Low flow objectives</heading><clause id="sch.5-sec" guid="_9ced1652-e09f-41c0-83f9-cd098f27a107" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no/><subclause id="sch.5-sec-ssec.1" guid="_e75c638f-6e53-487a-9130-7d9046f5ec45" affected.by.uncommenced="0" provision.type="other"><no>1</no><block><txt break.before="0">At each node mentioned in table 1, column 1—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.5-sec-ssec.1-para1.a" guid="_9e56f10c-db98-46b8-9109-ea5e005b89c9" provision.type="other"><no>(a)</no><block><txt break.before="0">the percentage of the total number of days in the simulation period that the 50% non-zero daily flow is equalled or exceeded be at least the percentage stated, for the node, in table 1, column 2; and</txt></block></li><li id="sch.5-sec-ssec.1-para1.b" guid="_9960c44f-e08a-4ccf-9599-08cb7c6e5677" provision.type="other"><no>(b)</no><block><txt break.before="0">the percentage of the total number of days in the simulation period that the 80% non-zero daily flow is equalled or exceeded be at least the percentage stated, for the node, in table 1, column 3; and</txt></block></li><li id="sch.5-sec-ssec.1-para1.c" guid="_45b38dbb-75a3-48be-ba7f-d29f17d5dab3" provision.type="other"><no>(c)</no><block><txt break.before="0">the percentage of the total number of days in the simulation period that the daily flow is zero be not more than the percentage stated, for the node, in table 1, column 4.</txt></block></li></list></block><block><table frame="all" colsep="1" rowsep="0" orient="port" id="sch.5-sec-ssec.1-tbl" guid="_60dbeffd-e395-4f0a-8cd5-f85916cabab2" heading.align="center" font.size="12.pt"><heading id="sch.5-sec-ssec.1-tbl-he" guid="_479ece3f-0efe-4d6e-a932-e68bb70621c3">Table 1</heading><tgroup cols="4" colsep="1" rowsep="0" tgroupstyle="4columnRuled"><colspec colnum="1" colname="1" colwidth="1.276in"/><colspec colnum="2" colname="2" colwidth="1.297in"/><colspec colnum="3" colname="3" colwidth="1.140in"/><colspec colnum="4" colname="4" colwidth="1.287in"/><thead><row rowsep="0" id="sch.5-sec-ssec.1-tbl-tblh-tblr" guid="_5345862e-d986-4bdd-9460-d0ce846966c6"><entry colname="1" rowsep="1" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblh-tblr-tble1" guid="_6a5e321f-92c6-4bd1-a909-adf34058a619"><block><txt break.before="1"><b>Column 1</b></txt></block></entry><entry colname="2" rowsep="1" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblh-tblr-tble2" guid="_60009d71-dd4c-4d23-8b1d-e73ec896900d"><block><txt break.before="1"><b>Column 2</b></txt></block></entry><entry colname="3" rowsep="1" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblh-tblr-tble3" guid="_2daa9cdb-f603-4abe-ba28-a5c9388ebb2a"><block><txt break.before="1"><b>Column 3</b></txt></block></entry><entry colname="4" rowsep="1" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblh-tblr-tble4" guid="_b660d3c7-e643-410f-8c21-e73f1f3bf7a1"><block><txt break.before="1"><b>Column 4</b></txt></block></entry></row><row rowsep="0" id="sch.5-sec-ssec.1-tbl-tblh-tblr-oc.2" guid="_46c0c6ee-4347-46ba-b8e7-90037cf20599"><entry colname="1" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblh-tblr-oc.2-tble1" guid="_9e4eed0c-a8a1-4bd1-9a51-3f6ad1885fe6"><block><txt break.before="1"><b>Node</b></txt></block></entry><entry colname="2" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblh-tblr-oc.2-tble2" guid="_7085ab2f-a29e-4951-9b41-44b8e631d16f"><block><txt break.before="1"><b>Percentage</b></txt></block></entry><entry colname="3" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblh-tblr-oc.2-tble3" guid="_dd028ccf-e39e-4608-898d-78089666233d"><block><txt break.before="1"><b>Percentage</b></txt></block></entry><entry colname="4" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblh-tblr-oc.2-tble4" guid="_5d5d73b2-5836-4809-8cc4-c36744d86a43"><block><txt break.before="1"><b>Percentage</b></txt></block></entry></row></thead><tbody><row rowsep="1" id="sch.5-sec-ssec.1-tbl-tblr" guid="_bee641f6-5698-473c-a7ae-46e57aabee01"><entry colname="1" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblr-tble1" guid="_dd888d12-bbe3-4520-9236-a05907ea190d"><block><txt break.before="1">1</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblr-tble2" guid="_f17acd84-7de1-4540-aece-365db984d584"><block><txt break.before="1">24</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblr-tble3" guid="_e670d239-e3e7-45f8-9d66-20798b6ee8dc"><block><txt break.before="1">65</txt></block></entry><entry colname="4" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblr-tble4" guid="_0c969045-0896-4875-993b-f9e8d161190c"><block><txt break.before="1">5</txt></block></entry></row><row rowsep="1" id="sch.5-sec-ssec.1-tbl-tblr-oc.2" guid="_d73c68e9-1208-48a3-9cc3-71b49f8a5962"><entry colname="1" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblr-oc.2-tble1" guid="_820df22d-5ea6-4de2-b7c6-9e183d027472"><block><txt break.before="1">2</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblr-oc.2-tble2" guid="_bd994806-66bc-45c3-a26f-d8e4d99e7bbf"><block><txt break.before="1">15</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblr-oc.2-tble3" guid="_17e4f72c-1c47-46b3-a19e-2384b93c53fa"><block><txt break.before="1">26</txt></block></entry><entry colname="4" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblr-oc.2-tble4" guid="_43ae7a93-57f0-43a4-8bec-5b824b574c03"><block><txt break.before="1">66</txt></block></entry></row><row rowsep="1" id="sch.5-sec-ssec.1-tbl-tblr-oc.3" guid="_05fc0cb2-bd1f-4116-84c8-a5afc626958a"><entry colname="1" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblr-oc.3-tble1" guid="_fa836cf6-5b70-4622-9e80-18ed0cb4621f"><block><txt break.before="1">8</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblr-oc.3-tble2" guid="_69f7c8b3-44e7-4a2a-bf53-7360d508a339"><block><txt break.before="1">44</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblr-oc.3-tble3" guid="_c8cb5771-0b12-40eb-bbc5-3dbf9a2a4cf6"><block><txt break.before="1">69</txt></block></entry><entry colname="4" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblr-oc.3-tble4" guid="_6131d3b0-0a84-445a-8bdc-755b76f4a9ac"><block><txt break.before="1">15</txt></block></entry></row><row rowsep="1" id="sch.5-sec-ssec.1-tbl-tblr-oc.4" guid="_0df5608f-fefe-4fe8-a970-25563c73441a"><entry colname="1" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblr-oc.4-tble1" guid="_920acd8c-8d43-4fa3-8822-2de54fb1a8da"><block><txt break.before="1">10</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblr-oc.4-tble2" guid="_c10c8ce7-3eb3-42d6-a45f-33b0663015da"><block><txt break.before="1">25</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblr-oc.4-tble3" guid="_37ed19fb-b248-4554-afe4-838e6852ada4"><block><txt break.before="1">41</txt></block></entry><entry colname="4" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblr-oc.4-tble4" guid="_30f3c26c-2c84-44c8-abf5-7ea2e508d106"><block><txt break.before="1">49</txt></block></entry></row><row rowsep="1" id="sch.5-sec-ssec.1-tbl-tblr-oc.5" guid="_18699fcb-3c91-42a0-82eb-7f27305453a9"><entry colname="1" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblr-oc.5-tble1" guid="_b3a560f7-f85e-42d7-93bf-13af856bfc7d"><block><txt break.before="1">11</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblr-oc.5-tble2" guid="_22afab19-69ef-4723-a171-b7efce4328ca"><block><txt break.before="1">32</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblr-oc.5-tble3" guid="_2e0ba06f-bda1-4d5b-b08f-0065f6748835"><block><txt break.before="1">52</txt></block></entry><entry colname="4" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblr-oc.5-tble4" guid="_cbd31722-6081-4fa3-8017-ee31e7964b06"><block><txt break.before="1">35</txt></block></entry></row><row rowsep="0" id="sch.5-sec-ssec.1-tbl-tblr-oc.6" guid="_01dab69a-6727-4407-930a-e183a322377d"><entry colname="1" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblr-oc.6-tble1" guid="_e1df8fb8-686f-4594-ab8d-bab96fa09d6e"><block><txt break.before="1">12</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblr-oc.6-tble2" guid="_4bb45c0c-fd1b-4e90-b4cd-3b91d3bc8427"><block><txt break.before="1">32</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblr-oc.6-tble3" guid="_a92235a4-20a4-46d8-8f03-d465adbb1ed8"><block><txt break.before="1">62</txt></block></entry><entry colname="4" align="center" valign="top" id="sch.5-sec-ssec.1-tbl-tblr-oc.6-tble4" guid="_3de1d651-694d-4f1c-90ca-a0e1169571f8"><block><txt break.before="1">15</txt></block></entry></row></tbody></tgroup></table></block></subclause><subclause id="sch.5-sec-ssec.2" guid="_e9499d84-c8b9-42c3-98cd-05e435120907" affected.by.uncommenced="0" provision.type="other"><no>2</no><block><txt break.before="0">At each node mentioned in table 2, column 1, the percentage of the total number of days in a water flow season in the simulation period that the 80% non-zero daily flow is equalled or exceeded be at least the percentage stated for the water flow season, for the node, in table 2, column 2.</txt></block><block><table frame="all" colsep="1" rowsep="0" orient="port" id="sch.5-sec-ssec.2-tbl" guid="_fbc36b58-8fba-4d2c-9d6d-8992740b40dd" heading.align="center" font.size="12.pt"><heading id="sch.5-sec-ssec.2-tbl-he" guid="_e4e27c3c-5c95-4861-8cd0-cb9906f8af65">Table 2</heading><tgroup cols="5" colsep="1" rowsep="0" tgroupstyle="4columnRuled"><colspec colnum="1" colname="1" colwidth="0.839in"/><colspec colnum="2" colname="2" colwidth="1.027in"/><colspec colnum="3" colname="3" colwidth="1.038in"/><colspec colnum="4" colname="4" colwidth="1.048in"/><colspec colnum="5" colname="5" colwidth="1.048in"/><thead><row rowsep="0" id="sch.5-sec-ssec.2-tbl-tblh-tblr" guid="_c608bb99-5364-4ff2-8c94-ec02dc973b9f"><entry colname="1" rowsep="1" align="center" valign="top" id="sch.5-sec-ssec.2-tbl-tblh-tblr-tble1" guid="_86cd6ed1-3cc1-4b98-a0b0-cf945dba803b"><block><txt break.before="1"><b>Column 1</b></txt></block></entry><entry namest="2" nameend="5" rowsep="1" align="center" valign="top" id="sch.5-sec-ssec.2-tbl-tblh-tblr-tble2" guid="_cdc25150-11ae-4c23-a650-3f1a404c9ee7"><block><txt break.before="1"><b>Column 2</b></txt></block></entry></row><row rowsep="0" id="sch.5-sec-ssec.2-tbl-tblh-tblr-oc.2" guid="_33361059-6deb-4e0b-aeb0-e6f78db4a63a"><entry colname="1" morerows="1" align="center" valign="top" id="sch.5-sec-ssec.2-tbl-tblh-tblr-oc.2-tble1" guid="_0e38a96b-5f8c-4208-a21a-90ba699979e6"><block><txt break.before="1"><b>Node</b></txt></block></entry><entry namest="2" nameend="5" rowsep="1" align="center" valign="top" id="sch.5-sec-ssec.2-tbl-tblh-tblr-oc.2-tble2" guid="_b15fd539-e8df-42bf-9a0f-a9029b53f340"><block><txt break.before="1"><b>Water flow season</b></txt></block></entry></row><row rowsep="0" id="sch.5-sec-ssec.2-tbl-tblh-tblr-oc.3" guid="_e8f0b2fc-b551-48ab-b16f-adce96ba51b6"><entry colname="2" align="center" valign="top" id="sch.5-sec-ssec.2-tbl-tblh-tblr-oc.3-tble2" guid="_8be605cb-0645-4cc6-bcfb-84f21351096f"><block><txt break.before="1"><b>January–</b></txt></block><block><txt break.before="1"><b>March water flow season percentage</b></txt></block></entry><entry colname="3" align="center" valign="top" id="sch.5-sec-ssec.2-tbl-tblh-tblr-oc.3-tble3" guid="_705fa522-0fc9-4c48-9a97-72f18d448485"><block><txt break.before="1"><b>April–</b></txt></block><block><txt break.before="1"><b>June water flow season percentage</b></txt></block></entry><entry colname="4" align="center" valign="top" id="sch.5-sec-ssec.2-tbl-tblh-tblr-oc.3-tble4" guid="_1050b1d6-1266-4960-9701-6c84c8dfb8d7"><block><txt break.before="1"><b>July–</b></txt></block><block><txt break.before="1"><b>September water flow season percentage</b></txt></block></entry><entry colname="5" align="center" valign="top" id="sch.5-sec-ssec.2-tbl-tblh-tblr-oc.3-tble5" guid="_b211bd04-dbfb-4852-afe9-52e4707f5e8e"><block><txt break.before="1"><b>October–</b></txt></block><block><txt break.before="1"><b>December water flow season percentage</b></txt></block></entry></row></thead><tbody><row rowsep="1" id="sch.5-sec-ssec.2-tbl-tblr" guid="_27d46f03-f5e7-465c-96e3-dbe782bbaa43"><entry colname="1" align="center" valign="top" id="sch.5-sec-ssec.2-tbl-tblr-tble1" guid="_fad966b1-f33a-4984-b12b-39d01c96c6a3"><block><txt break.before="1">1</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.5-sec-ssec.2-tbl-tblr-tble2" guid="_dd184006-8e83-48a8-9fc9-13b1de557926"><block><txt break.before="1">92</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.5-sec-ssec.2-tbl-tblr-tble3" guid="_2ee7dc68-e7ff-4dfe-95c8-72fdfec88021"><block><txt break.before="1">84</txt></block></entry><entry colname="4" align="center" valign="top" id="sch.5-sec-ssec.2-tbl-tblr-tble4" guid="_3359a950-affc-4bfe-affb-ff3e90178f8d"><block><txt break.before="1">45</txt></block></entry><entry colname="5" align="center" valign="top" id="sch.5-sec-ssec.2-tbl-tblr-tble5" guid="_2dfd4433-c0a3-4583-b8aa-427008ea537c"><block><txt break.before="1">44</txt></block></entry></row><row rowsep="1" id="sch.5-sec-ssec.2-tbl-tblr-oc.2" guid="_efa2c7b0-ccea-4bad-b014-1e04d28f3295"><entry colname="1" align="center" valign="top" id="sch.5-sec-ssec.2-tbl-tblr-oc.2-tble1" guid="_a49d9eaa-081a-4194-9d2b-394268487d2d"><block><txt break.before="1">2</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.5-sec-ssec.2-tbl-tblr-oc.2-tble2" guid="_7e90e25a-4dc8-4c29-8871-fa35a3413d5c"><block><txt break.before="1">64</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.5-sec-ssec.2-tbl-tblr-oc.2-tble3" guid="_ba9428e8-52d1-4e19-aa88-c31a2936707b"><block><txt break.before="1">29</txt></block></entry><entry colname="4" align="center" valign="top" id="sch.5-sec-ssec.2-tbl-tblr-oc.2-tble4" guid="_e89f14ea-8dd9-4c87-b676-b6b546e4a126"><block><txt break.before="1">4</txt></block></entry><entry colname="5" align="center" valign="top" id="sch.5-sec-ssec.2-tbl-tblr-oc.2-tble5" guid="_be67b202-19a5-44b5-8184-7e337c6fcf14"><block><txt break.before="1">9</txt></block></entry></row><row rowsep="0" id="sch.5-sec-ssec.2-tbl-tblr-oc.3" guid="_96e79ac3-fe05-49b0-9857-993c307dcbaf"><entry colname="1" align="center" valign="top" id="sch.5-sec-ssec.2-tbl-tblr-oc.3-tble1" guid="_f632034f-692a-44d0-8374-2efa538f9f0b"><block><txt break.before="1">12</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.5-sec-ssec.2-tbl-tblr-oc.3-tble2" guid="_adfbf7d7-212d-48fc-9fb6-900dd5dc5fa6"><block><txt break.before="1">85</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.5-sec-ssec.2-tbl-tblr-oc.3-tble3" guid="_8f51e410-6194-4b33-bf8d-781980afe424"><block><txt break.before="1">81</txt></block></entry><entry colname="4" align="center" valign="top" id="sch.5-sec-ssec.2-tbl-tblr-oc.3-tble4" guid="_f2773884-9619-4b8f-aa5a-da4a4c8f3030"><block><txt break.before="1">46</txt></block></entry><entry colname="5" align="center" valign="top" id="sch.5-sec-ssec.2-tbl-tblr-oc.3-tble5" guid="_68f87c41-ea80-4b3c-ad43-86f1fdd3cb5f"><block><txt break.before="1">35</txt></block></entry></row></tbody></tgroup></table></block></subclause><subclause id="sch.5-sec-ssec.3" guid="_8060bb0c-f61f-4f01-91d0-7a10c9da6e16" affected.by.uncommenced="0" provision.type="other"><no>3</no><block><txt break.before="0">At each node mentioned in table 3, column 1—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.5-sec-ssec.3-para1.a" guid="_2d88ba7c-121c-42f8-954f-ded7689227e0" provision.type="other"><no>(a)</no><block><txt break.before="0">the number of periods of no flow of more than 1 month but not more than 6 months in the simulation period be not more than the number stated for the node in table 3, column 2; and</txt></block></li><li id="sch.5-sec-ssec.3-para1.b" guid="_0d45dbbf-1508-4c59-a03c-9ccfec29785f" provision.type="other"><no>(b)</no><block><txt break.before="0">the number of periods of no flow of more than 6 months in the simulation period be not more than the number stated for the node in table 3, column 3.</txt></block></li></list></block><block><table frame="all" colsep="1" rowsep="0" orient="port" id="sch.5-sec-ssec.3-tbl" guid="_5d6b30b9-1d6e-4ee4-9e13-bc9e4d213925" heading.align="center" font.size="12.pt"><heading id="sch.5-sec-ssec.3-tbl-he" guid="_955df798-8c50-4f29-9623-c97568bdad85">Table 3</heading><tgroup cols="3" colsep="1" rowsep="0" tgroupstyle="3columnRuled"><colspec colnum="1" colname="1" colwidth="1.413in"/><colspec colnum="2" colname="2" colwidth="1.809in"/><colspec colnum="3" colname="3" colwidth="1.778in"/><thead><row rowsep="0" id="sch.5-sec-ssec.3-tbl-tblh-tblr" guid="_1ddaded6-443b-4284-94c3-1602e6064461"><entry colname="1" rowsep="1" align="center" valign="top" id="sch.5-sec-ssec.3-tbl-tblh-tblr-tble1" guid="_f584e4e4-e454-4e51-bf58-74f1ee3239bd"><block><txt break.before="1"><b>Column 1</b></txt></block></entry><entry colname="2" rowsep="1" align="center" valign="top" id="sch.5-sec-ssec.3-tbl-tblh-tblr-tble2" guid="_a73ef94e-4e8c-4a86-ba49-df2fd15de9dc"><block><txt break.before="1"><b>Column 2</b></txt></block></entry><entry colname="3" rowsep="1" align="center" valign="top" id="sch.5-sec-ssec.3-tbl-tblh-tblr-tble3" guid="_056ee8cc-7db8-4cf1-928d-8b4b57ea9294"><block><txt break.before="1"><b>Column 3</b></txt></block></entry></row><row rowsep="0" id="sch.5-sec-ssec.3-tbl-tblh-tblr-oc.2" guid="_19dcd0de-b7ee-4e17-94b7-56d693237fdf"><entry colname="1" align="center" valign="top" id="sch.5-sec-ssec.3-tbl-tblh-tblr-oc.2-tble1" guid="_6eae7a41-65a7-404a-8b11-0557ecfc1aaf"><block><txt break.before="1"><b>Node</b></txt></block></entry><entry colname="2" align="center" valign="top" id="sch.5-sec-ssec.3-tbl-tblh-tblr-oc.2-tble2" guid="_ce68a05c-473a-40b8-b3ce-4b794b39704b"><block><txt break.before="1"><b>Periods of no flow of more than 1 month but not more than 6 months</b></txt></block></entry><entry colname="3" align="center" valign="top" id="sch.5-sec-ssec.3-tbl-tblh-tblr-oc.2-tble3" guid="_c69c2d68-9b3f-4afc-9fc8-0e6d52b96591"><block><txt break.before="1"><b>Periods of no flow of more than 6 months</b></txt></block></entry></row></thead><tbody><row rowsep="1" id="sch.5-sec-ssec.3-tbl-tblr" guid="_15bc4ccf-bd0b-41ab-9329-a1ab38b5642b"><entry colname="1" align="center" valign="top" id="sch.5-sec-ssec.3-tbl-tblr-tble1" guid="_f7fe3ac5-d3bb-4a15-80b4-e0c642dee276"><block><txt break.before="1">1</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.5-sec-ssec.3-tbl-tblr-tble2" guid="_7ba694b9-153a-4db3-b106-a415746a9b41"><block><txt break.before="1">11</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.5-sec-ssec.3-tbl-tblr-tble3" guid="_f9728cc6-898b-4cc9-98a7-172e4abddcd0"><block><txt break.before="1">0</txt></block></entry></row><row rowsep="1" id="sch.5-sec-ssec.3-tbl-tblr-oc.2" guid="_b0a0f9a6-cd25-47b7-aac4-69f1401e3083"><entry colname="1" align="center" valign="top" id="sch.5-sec-ssec.3-tbl-tblr-oc.2-tble1" guid="_4cfa7b59-22f2-4999-9847-9f29b5c7b91f"><block><txt break.before="1">2</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.5-sec-ssec.3-tbl-tblr-oc.2-tble2" guid="_49e50b0a-1d79-4c0e-846e-ffed8d53479e"><block><txt break.before="1">144</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.5-sec-ssec.3-tbl-tblr-oc.2-tble3" guid="_4da49815-4a01-49f9-99ce-3f9d858251e1"><block><txt break.before="1">43</txt></block></entry></row><row rowsep="1" id="sch.5-sec-ssec.3-tbl-tblr-oc.3" guid="_df4a27bb-1f98-4b7e-ab03-1710e83eaaca"><entry colname="1" align="center" valign="top" id="sch.5-sec-ssec.3-tbl-tblr-oc.3-tble1" guid="_115471e0-e740-4fa8-9724-6a906e7493ba"><block><txt break.before="1">8</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.5-sec-ssec.3-tbl-tblr-oc.3-tble2" guid="_2195b2cc-dd1f-45d4-853f-480a85c67cda"><block><txt break.before="1">57</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.5-sec-ssec.3-tbl-tblr-oc.3-tble3" guid="_3aa65caf-9f47-4500-b07c-f7d074b15479"><block><txt break.before="1">1</txt></block></entry></row><row rowsep="1" id="sch.5-sec-ssec.3-tbl-tblr-oc.4" guid="_042ff5c1-7c4c-4ed0-b70e-80360912461a"><entry colname="1" align="center" valign="top" id="sch.5-sec-ssec.3-tbl-tblr-oc.4-tble1" guid="_ee9c525f-dd90-44c8-b57a-0c8f59d94846"><block><txt break.before="1">10</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.5-sec-ssec.3-tbl-tblr-oc.4-tble2" guid="_715573b5-c8bc-4ac6-949a-99a43e48dde9"><block><txt break.before="1">165</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.5-sec-ssec.3-tbl-tblr-oc.4-tble3" guid="_47281277-82ff-4b12-9360-118b9b9a658f"><block><txt break.before="1">3</txt></block></entry></row><row rowsep="1" id="sch.5-sec-ssec.3-tbl-tblr-oc.5" guid="_4c933354-327f-45c6-9b4e-1665b280688a"><entry colname="1" align="center" valign="top" id="sch.5-sec-ssec.3-tbl-tblr-oc.5-tble1" guid="_32dc1a09-0237-40c4-a3a2-b143645478e8"><block><txt break.before="1">11</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.5-sec-ssec.3-tbl-tblr-oc.5-tble2" guid="_23daebba-4128-4f20-a96f-d4513030b034"><block><txt break.before="1">118</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.5-sec-ssec.3-tbl-tblr-oc.5-tble3" guid="_c5858a61-b58f-4b2a-92fe-cb3e134864a4"><block><txt break.before="1">1</txt></block></entry></row><row rowsep="0" id="sch.5-sec-ssec.3-tbl-tblr-oc.6" guid="_4bfc560a-4f03-4829-9976-6322fbc76b78"><entry colname="1" align="center" valign="top" id="sch.5-sec-ssec.3-tbl-tblr-oc.6-tble1" guid="_6676fad6-6ee2-4fed-b7bd-93bec78ea7f2"><block><txt break.before="1">12</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.5-sec-ssec.3-tbl-tblr-oc.6-tble2" guid="_60e13a78-c699-4ba8-add2-6cc3210a77e2"><block><txt break.before="1">54</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.5-sec-ssec.3-tbl-tblr-oc.6-tble3" guid="_afd31da5-652b-4d01-883a-db8f8dc73c97"><block><txt break.before="1">2</txt></block></entry></row></tbody></tgroup></table></block></subclause></clause></part><part id="sch.5-pt.2" guid="_1936baa4-ccd6-4586-a51e-7c6b2d76ea46" affected.by.uncommenced="0" numbering.style="manual" toc="no"><no>Part 2</no><heading id="sch.5-pt.2-he" guid="_3b3e236a-ca76-40de-9cb4-de1d70a344ef">Medium to high flow objectives</heading><clause id="sch.5-sec-oc.2" guid="_da1f5be7-b70f-4dfc-8158-915712dd6e8b" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no/><subclause id="sch.5-sec-oc.2-ssec.1" guid="_80ed0c05-e033-4c96-87cb-d613fbc9e426" affected.by.uncommenced="0" provision.type="other"><no>1</no><block><txt break.before="0">At each node mentioned in table 4, column 1—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.5-sec-oc.2-ssec.1-para1.a" guid="_30caaf34-c186-4379-92b5-b4b1010ca47b" provision.type="other"><no>(a)</no><block><txt break.before="0">the mean annual flow in the simulation period, expressed as a percentage of the mean annual flow for the pre-development flow pattern, be at least the percentage stated for the node in table 4, column 2; and</txt></block></li><li id="sch.5-sec-oc.2-ssec.1-para1.b" guid="_3a38c49e-b888-4eaf-b949-1a9aaf57a091" provision.type="other"><no>(b)</no><block><txt break.before="0">the median annual flow in the simulation period, expressed as a percentage of the median annual flow for the pre-development flow pattern, be at least the percentage stated for the node in table 4, column 3; and</txt></block></li><li id="sch.5-sec-oc.2-ssec.1-para1.c" guid="_96b2b545-6e5c-4bea-9223-1984938d744c" provision.type="other"><no>(c)</no><block><txt break.before="0">the 1.5 year daily flow volume in the simulation period, expressed as a percentage of the 1.5 year daily flow volume for the pre-development flow pattern, be at least the percentage stated for the node in table 4, column 4; and</txt></block></li><li id="sch.5-sec-oc.2-ssec.1-para1.d" guid="_5efca6c3-dca7-4f62-b353-60ee7b604dd3" provision.type="other"><no>(d)</no><block><txt break.before="0">the 5 year daily flow volume in the simulation period, expressed as a percentage of the 5 year daily flow volume for the pre-development flow pattern, be at least the percentage stated for the node in table 4, column 5; and</txt></block></li><li id="sch.5-sec-oc.2-ssec.1-para1.e" guid="_08010e6d-1495-44b5-82d4-67524fac237e" provision.type="other"><no>(e)</no><block><txt break.before="0">the 20 year daily flow volume in the simulation period, expressed as a percentage of the 20 year daily flow volume for the pre-development flow pattern, be at least the percentage stated for the node in table 4, column 6.</txt></block></li></list></block><block><table frame="all" colsep="1" rowsep="0" orient="port" id="sch.5-sec-oc.2-ssec.1-tbl" guid="_ab248f9a-ca20-4b86-9d92-463298132a9a" heading.align="center" font.size="12.pt"><heading id="sch.5-sec-oc.2-ssec.1-tbl-he" guid="_07e3d74a-53c6-405a-971b-159c11192467">Table 4</heading><tgroup cols="6" colsep="1" rowsep="0" tgroupstyle="4columnRuled"><colspec colnum="1" colname="1" colwidth="0.631in"/><colspec colnum="2" colname="2" colwidth="0.880in"/><colspec colnum="3" colname="3" colwidth="0.890in"/><colspec colnum="4" colname="4" colwidth="0.859in"/><colspec colnum="5" colname="5" colwidth="0.859in"/><colspec colnum="6" colname="6" colwidth="0.880in"/><thead><row rowsep="0" id="sch.5-sec-oc.2-ssec.1-tbl-tblh-tblr" guid="_5b37196b-1e78-4aa5-879c-c5969e5442be"><entry colname="1" rowsep="1" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblh-tblr-tble1" guid="_1cc6ef36-3d95-4c45-a7cd-b4b5ebc03a11"><block><txt break.before="1"><b>Column 1</b></txt></block></entry><entry colname="2" rowsep="1" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblh-tblr-tble2" guid="_f8af6371-c623-42a9-a1a0-9fed21029df8"><block><txt break.before="1"><b>Column 2</b></txt></block></entry><entry colname="3" rowsep="1" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblh-tblr-tble3" guid="_91d88e3d-6d86-41fd-9456-2e637e661b48"><block><txt break.before="1"><b>Column 3</b></txt></block></entry><entry colname="4" rowsep="1" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblh-tblr-tble4" guid="_9c6c92ea-4e0b-4061-a52c-750ac1f99e40"><block><txt break.before="1"><b>Column 4</b></txt></block></entry><entry colname="5" rowsep="1" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblh-tblr-tble5" guid="_128d6f5d-93a3-40f5-b78b-cbcca2daec36"><block><txt break.before="1"><b>Column 5</b></txt></block></entry><entry colname="6" rowsep="1" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblh-tblr-tble6" guid="_a5620979-ec07-4c32-b24e-02dbe6f364f3"><block><txt break.before="1"><b>Column 6</b></txt></block></entry></row><row rowsep="0" id="sch.5-sec-oc.2-ssec.1-tbl-tblh-tblr-oc.2" guid="_3d1165b0-a99e-4d5a-bf85-4db3fbbde431"><entry colname="1" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblh-tblr-oc.2-tble1" guid="_8abb1ea4-8fb3-43c7-bdfb-4b6395d6784a"><block><txt break.before="1"><b>Node</b></txt></block></entry><entry colname="2" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblh-tblr-oc.2-tble2" guid="_de745f92-1982-40b5-aeed-d10749dab59a"><block><txt break.before="1"><b>Mean annual flow percentage</b></txt></block></entry><entry colname="3" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblh-tblr-oc.2-tble3" guid="_32c82c32-5e99-4b79-b949-80155bc67b34"><block><txt break.before="1"><b>Median annual flow percentage</b></txt></block></entry><entry colname="4" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblh-tblr-oc.2-tble4" guid="_e8953942-cc4c-4fda-8228-52bc9d358583"><block><txt break.before="1"><b>1.5 year daily flow volume</b></txt></block><block><txt break.before="1"><b>percentage</b></txt></block></entry><entry colname="5" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblh-tblr-oc.2-tble5" guid="_1fdd7587-fd1b-4a5a-b243-25b70d25f88e"><block><txt break.before="1"><b>5 year daily flow volume percentage</b></txt></block></entry><entry colname="6" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblh-tblr-oc.2-tble6" guid="_0b0c3750-56ac-4f17-8886-599a4a0245e6"><block><txt break.before="1"><b>20 year daily flow volume percentage</b></txt></block></entry></row></thead><tbody><row rowsep="1" id="sch.5-sec-oc.2-ssec.1-tbl-tblr" guid="_55429f50-4750-4e0e-a717-2620d4b07161"><entry colname="1" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-tble1" guid="_fd3b752e-ea04-4eea-9786-8c82b6d2081d"><block><txt break.before="1">1</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-tble2" guid="_d65c6ab0-4dad-49e7-9496-12017c6ea705"><block><txt break.before="1">75</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-tble3" guid="_2161a866-824f-45f8-810a-426096362ca5"><block><txt break.before="1">59</txt></block></entry><entry colname="4" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-tble4" guid="_e621e400-9eaa-4011-b6df-5312c2e725a6"><block><txt break.before="1">50</txt></block></entry><entry colname="5" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-tble5" guid="_cd43c0ed-7e62-4309-88c5-9da5638c1c55"><block><txt break.before="1">79</txt></block></entry><entry colname="6" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-tble6" guid="_df6bbc90-ef8f-41c2-baae-88c1cefac2ef"><block><txt break.before="1">86</txt></block></entry></row><row rowsep="1" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.2" guid="_455d9160-1c51-44bb-b8c7-59c78fd16443"><entry colname="1" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.2-tble1" guid="_d96e6c9f-8d8c-4d4f-b172-96fecf1bc771"><block><txt break.before="1">2</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.2-tble2" guid="_406a9cc7-a011-4ec2-8fa0-98edfa65f8a6"><block><txt break.before="1">92</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.2-tble3" guid="_993aff84-03cc-440d-8357-a579faa7365d"><block><txt break.before="1">88</txt></block></entry><entry colname="4" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.2-tble4" guid="_79d3f249-347a-4482-9caf-4b042651c5f6"><block><txt break.before="1">95</txt></block></entry><entry colname="5" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.2-tble5" guid="_3a4410d5-1416-4229-b614-d1d42b56cf4b"><block><txt break.before="1">—</txt></block></entry><entry colname="6" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.2-tble6" guid="_f11d77cb-13b9-4b0e-862a-5376c46135d5"><block><txt break.before="1">—</txt></block></entry></row><row rowsep="1" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.3" guid="_43061ba2-618b-47c4-96eb-60b01088ee55"><entry colname="1" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.3-tble1" guid="_32324d45-4d87-4935-8256-14250b0b34f1"><block><txt break.before="1">8</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.3-tble2" guid="_d76b6faa-bb44-423e-a6ea-786826e5c44c"><block><txt break.before="1">97</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.3-tble3" guid="_f0c20d51-9afb-458b-ac4d-4fbbe48012f3"><block><txt break.before="1">96</txt></block></entry><entry colname="4" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.3-tble4" guid="_22c1d09b-c117-4a77-a55c-d5086c7aa0d3"><block><txt break.before="1">99</txt></block></entry><entry colname="5" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.3-tble5" guid="_9610d0e9-82f2-49d0-9e5e-ac211a5742b9"><block><txt break.before="1">—</txt></block></entry><entry colname="6" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.3-tble6" guid="_21d52d5a-b654-4a7c-a2e9-45d9bd110c5b"><block><txt break.before="1">—</txt></block></entry></row><row rowsep="1" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.4" guid="_a3f967ad-af88-449c-9687-9c5878154765"><entry colname="1" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.4-tble1" guid="_471013ae-1f45-4072-abed-e9f02786c7ea"><block><txt break.before="1">10</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.4-tble2" guid="_205c046d-4d7b-4b6e-9d0e-49179b2371a2"><block><txt break.before="1">98</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.4-tble3" guid="_d5ca0b95-67e2-4e85-aa9c-6a4fa8b8a37c"><block><txt break.before="1">97</txt></block></entry><entry colname="4" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.4-tble4" guid="_cccdf8a2-c842-4dca-9120-e9ea3b7743ec"><block><txt break.before="1">98</txt></block></entry><entry colname="5" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.4-tble5" guid="_1b4e6a6f-3869-499e-b08c-5ea87fdf0b12"><block><txt break.before="1">99</txt></block></entry><entry colname="6" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.4-tble6" guid="_ea2b4973-b87b-4119-993e-97134bc5eb92"><block><txt break.before="1">99</txt></block></entry></row><row rowsep="1" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.5" guid="_fdbde710-4745-44bf-8063-1c68c56bde64"><entry colname="1" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.5-tble1" guid="_770864db-6c85-4b75-8492-b5b48370dd33"><block><txt break.before="1">11</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.5-tble2" guid="_51696bd4-c1ef-4938-b517-4333bdb64021"><block><txt break.before="1">92</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.5-tble3" guid="_a66a6c2e-8aba-4456-a218-ef5eb3aab1b6"><block><txt break.before="1">88</txt></block></entry><entry colname="4" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.5-tble4" guid="_1dd51ca7-edba-487f-8472-a5df7f4e14c5"><block><txt break.before="1">94</txt></block></entry><entry colname="5" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.5-tble5" guid="_1e6aca44-a006-40b5-abb0-40a937efcdac"><block><txt break.before="1">96</txt></block></entry><entry colname="6" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.5-tble6" guid="_b132b700-205c-496f-bec5-f9af7560bf05"><block><txt break.before="1">98</txt></block></entry></row><row rowsep="0" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.6" guid="_293a8b52-4df7-4885-88cc-04f67f1bd987"><entry colname="1" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.6-tble1" guid="_d0ce0fc6-7e9e-458e-b7b5-88ca697afd5a"><block><txt break.before="1">12</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.6-tble2" guid="_e982db0c-b927-4dde-a2b0-952f6b9c5ab6"><block><txt break.before="1">82</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.6-tble3" guid="_987a9d37-eed1-4689-a380-d9a387de5c2b"><block><txt break.before="1">80</txt></block></entry><entry colname="4" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.6-tble4" guid="_6612a4c8-07e7-42ba-9d3d-a4a339527e98"><block><txt break.before="1">92</txt></block></entry><entry colname="5" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.6-tble5" guid="_c45342e3-48da-4140-90f0-7192c43f0c4e"><block><txt break.before="1">86</txt></block></entry><entry colname="6" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-tblr-oc.6-tble6" guid="_0ff9f0d0-0caf-4e79-9975-fb2eb75a7e81"><block><txt break.before="1">86</txt></block></entry></row></tbody></tgroup></table><list number.type="manual" unnumbered.indent="0"><li id="sch.5-sec-oc.2-ssec.1-para1.2" guid="_476b1c44-489a-41f2-a8b2-6325329d326f" provision.type="other"><no>2</no><block><txt break.before="0">At each node mentioned in table 5, column 1, the annual proportional flow deviation be not more than the annual proportional flow deviation stated for the node in table 5, column 2.</txt></block></li></list></block><block><table frame="all" colsep="0" rowsep="0" orient="port" id="sch.5-sec-oc.2-ssec.1-tbl-oc.2" guid="_1a505f70-a995-458b-83fa-08ae32760acc" heading.align="center" font.size="12.pt"><heading id="sch.5-sec-oc.2-ssec.1-tbl-oc.2-he" guid="_403872e9-9a66-420a-86a5-c4481cfa3135">Table 5</heading><tgroup cols="2" colsep="0" rowsep="0" tgroupstyle="2columnRuled"><colspec colnum="1" colname="1" colwidth="1.503in" colsep="0"/><colspec colnum="2" colname="2" colwidth="3.497in" colsep="0"/><thead><row rowsep="0" id="sch.5-sec-oc.2-ssec.1-tbl-oc.2-tblh-tblr" guid="_6f62838f-0648-4da5-9c4b-06d45c5f252c"><entry colname="1" colsep="1" rowsep="1" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-oc.2-tblh-tblr-tble1" guid="_97a3ffc1-686d-4257-872e-e3720857dc49"><block><txt break.before="1"><b>Column 1</b></txt></block></entry><entry colname="2" rowsep="1" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-oc.2-tblh-tblr-tble2" guid="_e66adb61-8b92-4e6b-aaa3-910a939d3cfb"><block><txt break.before="1"><b>Column 2</b></txt></block></entry></row><row rowsep="0" id="sch.5-sec-oc.2-ssec.1-tbl-oc.2-tblh-tblr-oc.2" guid="_100ceead-01ff-4e3f-a9c1-74a43fe93cba"><entry colname="1" colsep="1" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-oc.2-tblh-tblr-oc.2-tble1" guid="_6aa31862-cdf1-4b2f-b6c9-0095c293af09"><block><txt break.before="1"><b>Node</b></txt></block></entry><entry colname="2" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-oc.2-tblh-tblr-oc.2-tble2" guid="_a96965d9-8f96-4670-bd13-337057062ede"><block><txt break.before="1"><b>Annual proportional flow deviation</b></txt></block></entry></row></thead><tbody><row rowsep="0" id="sch.5-sec-oc.2-ssec.1-tbl-oc.2-tblr" guid="_0c5cbb20-96a7-4dfc-86f3-97f98bb8edb8"><entry colname="1" colsep="1" rowsep="1" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-oc.2-tblr-tble1" guid="_121e26e5-7999-481b-aa5d-8273639efaf7"><block><txt break.before="1">1</txt></block></entry><entry colname="2" rowsep="1" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-oc.2-tblr-tble2" guid="_d4908ce1-0283-4f7e-8adb-7a77a7095535"><block><txt break.before="1">2.9</txt></block></entry></row><row rowsep="0" id="sch.5-sec-oc.2-ssec.1-tbl-oc.2-tblr-oc.2" guid="_75a9a65b-017e-4667-b179-604ef5aeb68a"><entry colname="1" colsep="1" rowsep="1" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-oc.2-tblr-oc.2-tble1" guid="_68dc5849-f76e-40cc-a723-aa14a6286e51"><block><txt break.before="1">2</txt></block></entry><entry colname="2" rowsep="1" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-oc.2-tblr-oc.2-tble2" guid="_2d3bfbb4-7f31-4daf-827e-bcf6f7fd59d6"><block><txt break.before="1">1.8</txt></block></entry></row><row rowsep="0" id="sch.5-sec-oc.2-ssec.1-tbl-oc.2-tblr-oc.3" guid="_f0393819-11e3-4a24-89e7-b72830deb95e"><entry colname="1" colsep="1" rowsep="1" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-oc.2-tblr-oc.3-tble1" guid="_6f5c53ae-c734-4f64-9e3f-52ba2106c6bc"><block><txt break.before="1">10</txt></block></entry><entry colname="2" rowsep="1" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-oc.2-tblr-oc.3-tble2" guid="_2e953608-c204-47a9-a05e-0377f13071ea"><block><txt break.before="1">0.2</txt></block></entry></row><row rowsep="0" id="sch.5-sec-oc.2-ssec.1-tbl-oc.2-tblr-oc.4" guid="_9a6abdf4-400c-4743-93d1-78a4f61e5000"><entry colname="1" colsep="1" rowsep="1" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-oc.2-tblr-oc.4-tble1" guid="_381fa6a1-e12a-46a2-9383-b12568ea6c73"><block><txt break.before="1">11</txt></block></entry><entry colname="2" rowsep="1" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-oc.2-tblr-oc.4-tble2" guid="_1ab952e5-7928-4957-a5ff-4c899b076489"><block><txt break.before="1">1.0</txt></block></entry></row><row rowsep="0" id="sch.5-sec-oc.2-ssec.1-tbl-oc.2-tblr-oc.5" guid="_053a4337-790b-41a4-a5e6-b1aab48f10ff"><entry colname="1" colsep="1" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-oc.2-tblr-oc.5-tble1" guid="_23c2a630-c10f-49c9-ad16-d3bfa373630a"><block><txt break.before="1">12</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.5-sec-oc.2-ssec.1-tbl-oc.2-tblr-oc.5-tble2" guid="_845c62be-25fe-4dd0-b743-6ddec7c4d216"><block><txt break.before="1">1.2</txt></block></entry></row></tbody></tgroup></table></block></subclause></clause></part><historynote><txt break.before="1"><b>sch 5 </b>amd <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref> s 52</txt></historynote></schedule><schedule id="sch.6" guid="_c6efa7c7-492c-497e-95e3-098070fd8c6f" type="schedule" affected.by.uncommenced="0" spent.amends="0" numbering.style="manual" provision.type="other"><no>Schedule 6</no><heading id="sch.6-he" guid="_48ee2581-94cc-40d8-8ff1-1cd4d63c3ac3">Water allocation security objectives</heading><sourceref id="sch.6-ref" guid="_cd924bf1-e131-4722-a470-075a4d7d75fd" affected.by.uncommenced="0"><intref refid="sec.28-he" target.guid="_ed1be544-ae8d-4ff0-8c23-ff4425b24d03" check="valid">section&#160;18</intref></sourceref><part id="sch.6-pt.1" guid="_f89cbb24-65b2-4135-b4b7-3fbd8ed4a3c2" affected.by.uncommenced="0" numbering.style="manual" toc="no"><no>Part 1</no><heading id="sch.6-pt.1-he" guid="_431556f7-259e-4531-aa84-c27f650f6b53">Supplemented water</heading><clause id="sch.6-sec" guid="_e484a979-aca1-46cf-99ab-953aecb1adda" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no/><subclause id="sch.6-sec-ssec.1" guid="_40d0c4a8-41a8-4d8f-83c7-a1cbeabd33c2" affected.by.uncommenced="0" provision.type="other"><no>1</no><block><txt break.before="0">For water allocations in the high priority group in the Burdekin Haughton Water Supply Scheme, the annual supplemented water sharing index be 100%.</txt></block></subclause><subclause id="sch.6-sec-ssec.2" guid="_ba4b974c-f836-4d55-9eb4-998291137f88" affected.by.uncommenced="0" provision.type="other"><no>2</no><block><txt break.before="0">For water allocations in the medium priority group in the Burdekin Haughton Water Supply Scheme—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.6-sec-ssec.2-para1.a" guid="_348376cd-31e8-4c88-bad4-569621fa0b45" provision.type="other"><no>(a)</no><block><txt break.before="0">the annual supplemented water sharing index be at least 90%; and</txt></block></li><li id="sch.6-sec-ssec.2-para1.b" guid="_01287400-ada4-487a-8d6c-a74ec3127188" provision.type="other"><no>(b)</no><block><txt break.before="0">the monthly supplemented water sharing index be at least 95%; and</txt></block></li></list></block></subclause><subclause id="sch.6-sec-ssec.3" guid="_630e3cf9-2aa4-4ad2-a3bc-79a1dfef9344" affected.by.uncommenced="0" provision.type="other"><no>3</no><block><txt break.before="0">For water allocations in the high A1 priority group in the Bowen Broken Water Supply Scheme—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.6-sec-ssec.3-para1.a" guid="_67cc475e-5264-4eac-9a49-a173f9fdf61d" provision.type="other"><no>(a)</no><block><txt break.before="0">the annual supplemented water sharing index be at least 95%; and</txt></block></li><li id="sch.6-sec-ssec.3-para1.b" guid="_a7db81b9-90ff-4a86-89f2-6dae5c57b63d" provision.type="other"><no>(b)</no><block><txt break.before="0">the extent to which it is less than 99% be minimised; and</txt></block></li><li id="sch.6-sec-ssec.3-para1.c" guid="_5fbed4fd-bddc-487f-b411-fcfaf57a8364" provision.type="other"><no>(c)</no><block><txt break.before="0">the monthly supplemented water sharing index be at least 98%.</txt></block></li></list></block></subclause><subclause id="sch.6-sec-ssec.4" guid="_65641c48-ae00-4c6e-bb39-c7dc0e78a64b" affected.by.uncommenced="0" provision.type="other"><no>4</no><block><txt break.before="0">For water allocations in the high A2 priority group in the Bowen Broken Water Supply Scheme—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.6-sec-ssec.4-para1.a" guid="_fb6bfcc9-222e-42bd-ae20-0367cc4a765e" provision.type="other"><no>(a)</no><block><txt break.before="0">the annual supplemented water sharing index be at least 90%; and</txt></block></li><li id="sch.6-sec-ssec.4-para1.b" guid="_36e17334-72ce-4df4-848d-30c68e7398c1" provision.type="other"><no>(b)</no><block><txt break.before="0">the extent to which it is less than 95% be minimised; and</txt></block></li><li id="sch.6-sec-ssec.4-para1.c" guid="_dbde4a85-d1e8-4d63-a827-e80e3703ae24" provision.type="other"><no>(c)</no><block><txt break.before="0">the monthly supplemented water sharing index be at least 98%; and</txt></block></li><li id="sch.6-sec-ssec.4-para1.d" guid="_f9828640-4456-4fb7-be6c-a739585987ed" provision.type="other"><no>(d)</no><block><txt break.before="0">the extent to which it is less than 99% be minimised.</txt></block></li></list></block></subclause><subclause id="sch.6-sec-ssec.5" guid="_ddcf9672-77b3-4530-a6b5-ee735b4c089a" affected.by.uncommenced="0" provision.type="other"><no>5</no><block><txt break.before="0">For water allocations in the medium priority group in the Bowen Broken Water Supply Scheme—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.6-sec-ssec.5-para1.a" guid="_b9dc7e69-777e-49e5-a664-fb7b50729911" provision.type="other"><no>(a)</no><block><txt break.before="0">the annual supplemented water sharing index be at least 65%; and</txt></block></li><li id="sch.6-sec-ssec.5-para1.b" guid="_3b0bc195-12c5-4351-a563-f526ee523594" provision.type="other"><no>(b)</no><block><txt break.before="0">the extent to which it is less than 75% be minimised; and</txt></block></li><li id="sch.6-sec-ssec.5-para1.c" guid="_c78bea69-7fdc-493d-b948-ea46e3f0c71e" provision.type="other"><no>(c)</no><block><txt break.before="0">the monthly supplemented water sharing index be at least 85%; and</txt></block></li><li id="sch.6-sec-ssec.5-para1.d" guid="_b45b12ab-e145-46d6-abbd-1882a9787952" provision.type="other"><no>(d)</no><block><txt break.before="0">the extent to which it is less than 90% be minimised.</txt></block></li></list></block></subclause></clause></part><part id="sch.6-pt.2" guid="_d790d260-25da-4dc8-b301-253a9bf9b43e" affected.by.uncommenced="0" numbering.style="manual" toc="no"><no>Part 2</no><heading id="sch.6-pt.2-he" guid="_3028f3e8-ae4d-445c-8816-19498d535240">Unsupplemented water</heading><clause id="sch.6-sec-oc.2" guid="_c6d2eafa-34dc-49a7-b3e2-4916b387f422" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no/><subclause id="sch.6-sec-oc.2-ssec.1" guid="_2a480759-d15e-4828-aba0-e3fa0df82b68" affected.by.uncommenced="0" provision.type="other"><no>1</no><block><txt break.before="0">For water allocations in a water allocation group mentioned in table 1, column 1—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.6-sec-oc.2-ssec.1-para1.a" guid="_cad51960-01a3-4d60-a409-a879f46e331b" provision.type="other"><no>(a)</no><block><txt break.before="0">the 30% unsupplemented water sharing index be at least the percentage stated for the group in table 1, column 2; and</txt></block></li><li id="sch.6-sec-oc.2-ssec.1-para1.b" guid="_ac9a14a3-f5f1-438c-9646-fd20fccbf478" provision.type="other"><no>(b)</no><block><txt break.before="0">the 50% unsupplemented water sharing index be at least the percentage stated for the group in table 1, column 3; and</txt></block></li><li id="sch.6-sec-oc.2-ssec.1-para1.c" guid="_60413960-2979-4cf3-a5d9-9c43d5abbfd7" provision.type="other"><no>(c)</no><block><txt break.before="0">the 70% unsupplemented water sharing index be at least the percentage stated for the group in table 1, column 4.</txt></block></li></list></block><block><table frame="all" colsep="1" rowsep="0" orient="port" id="sch.6-sec-oc.2-ssec.1-tbl" guid="_5933998c-a18e-4c83-a24a-835ca331674a" heading.align="center" font.size="12.pt"><heading id="sch.6-sec-oc.2-ssec.1-tbl-he" guid="_a0bd6867-bc69-47ea-9e8c-a25e6b3f3ff2">Table 1</heading><tgroup cols="4" colsep="1" rowsep="0" tgroupstyle="4columnRuled"><colspec colnum="1" colname="1" colwidth="1.117in"/><colspec colnum="2" colname="2" colwidth="1.305in"/><colspec colnum="3" colname="3" colwidth="1.305in"/><colspec colnum="4" colname="4" colwidth="1.273in"/><thead><row rowsep="0" id="sch.6-sec-oc.2-ssec.1-tbl-tblh-tblr" guid="_9d4dead6-de33-4d96-82c3-c7ef9ed2c149"><entry colname="1" rowsep="1" align="center" valign="top" id="sch.6-sec-oc.2-ssec.1-tbl-tblh-tblr-tble1" guid="_5bd7de3f-666d-4562-b6d4-91066ea87918"><block><txt break.before="1"><b>Column 1</b></txt></block></entry><entry colname="2" rowsep="1" align="center" valign="top" id="sch.6-sec-oc.2-ssec.1-tbl-tblh-tblr-tble2" guid="_9d14a489-1690-4e6e-a6b9-7edca7d50269"><block><txt break.before="1"><b>Column 2</b></txt></block></entry><entry colname="3" rowsep="1" align="center" valign="top" id="sch.6-sec-oc.2-ssec.1-tbl-tblh-tblr-tble3" guid="_f14f7180-1315-4cb7-b751-20d09bcb7ee3"><block><txt break.before="1"><b>Column 3</b></txt></block></entry><entry colname="4" rowsep="1" align="center" valign="top" id="sch.6-sec-oc.2-ssec.1-tbl-tblh-tblr-tble4" guid="_64ca11e6-a00f-4d81-8e7b-7beb7e844be3"><block><txt break.before="1"><b>Column 4</b></txt></block></entry></row><row rowsep="0" id="sch.6-sec-oc.2-ssec.1-tbl-tblh-tblr-oc.2" guid="_8aca867c-d253-4125-a604-c55e3e906351"><entry colname="1" align="center" valign="top" id="sch.6-sec-oc.2-ssec.1-tbl-tblh-tblr-oc.2-tble1" guid="_430e792e-ad5e-4af8-9850-875f3fc213ec"><block><txt break.before="1"><b>Water allocation group</b></txt></block></entry><entry colname="2" align="center" valign="top" id="sch.6-sec-oc.2-ssec.1-tbl-tblh-tblr-oc.2-tble2" guid="_e1f725ce-2160-47f0-aca9-bbaca97091ae"><block><txt break.before="1"><b>30% unsupplemented water sharing index percentage</b></txt></block></entry><entry colname="3" align="center" valign="top" id="sch.6-sec-oc.2-ssec.1-tbl-tblh-tblr-oc.2-tble3" guid="_8f7661c8-f732-4728-944d-2927726ecd07"><block><txt break.before="1"><b>50% unsupplemented water sharing index percentage</b></txt></block></entry><entry colname="4" align="center" valign="top" id="sch.6-sec-oc.2-ssec.1-tbl-tblh-tblr-oc.2-tble4" guid="_8927d9fd-d8ec-427f-955b-1e0fca69b07f"><block><txt break.before="1"><b>70% unsupplemented water sharing index percentage</b></txt></block></entry></row></thead><tbody><row rowsep="1" id="sch.6-sec-oc.2-ssec.1-tbl-tblr" guid="_f9ff0eb8-1843-435c-9fd5-ec12f48508b7"><entry colname="1" align="left" valign="top" id="sch.6-sec-oc.2-ssec.1-tbl-tblr-tble1" guid="_68223f78-ceea-4618-a69e-ce26a2c2bdbb"><block><txt break.before="1">A1 (Lower Burdekin)</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.6-sec-oc.2-ssec.1-tbl-tblr-tble2" guid="_810dc129-1b15-4b10-96b0-f9603c53831c"><block><txt break.before="1">107</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.6-sec-oc.2-ssec.1-tbl-tblr-tble3" guid="_b22c47af-4ead-402f-aa48-2e1177752392"><block><txt break.before="1">107</txt></block></entry><entry colname="4" align="center" valign="top" id="sch.6-sec-oc.2-ssec.1-tbl-tblr-tble4" guid="_8919ff33-d40a-43d0-9d18-192d23eabd89"><block><txt break.before="1">107</txt></block></entry></row><row rowsep="1" id="sch.6-sec-oc.2-ssec.1-tbl-tblr-oc.2" guid="_ae9b251b-1f5c-4689-a4d2-8635d7a2da3f"><entry colname="1" align="left" valign="top" id="sch.6-sec-oc.2-ssec.1-tbl-tblr-oc.2-tble1" guid="_64def707-9bfd-4107-8d77-079e22809de3"><block><txt break.before="1">B1 (Haughton)</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.6-sec-oc.2-ssec.1-tbl-tblr-oc.2-tble2" guid="_ef84487b-821d-4a7c-b76c-9b247dac193a"><block><txt break.before="1">107</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.6-sec-oc.2-ssec.1-tbl-tblr-oc.2-tble3" guid="_00bff6cb-4fb0-4ef1-b1e2-0045849f1109"><block><txt break.before="1">107</txt></block></entry><entry colname="4" align="center" valign="top" id="sch.6-sec-oc.2-ssec.1-tbl-tblr-oc.2-tble4" guid="_ce6d0b11-a231-422e-b8f6-968c8127fccb"><block><txt break.before="1">107</txt></block></entry></row><row rowsep="0" id="sch.6-sec-oc.2-ssec.1-tbl-tblr-oc.3" guid="_c8a0db90-3515-4a05-aec9-c360cb9112d1"><entry colname="1" align="left" valign="top" id="sch.6-sec-oc.2-ssec.1-tbl-tblr-oc.3-tble1" guid="_88947330-53b4-4e4f-8fe9-6f19b0d23f6f"><block><txt break.before="1">C1 (Bowen)</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.6-sec-oc.2-ssec.1-tbl-tblr-oc.3-tble2" guid="_8970881b-bf8f-423a-9780-2f5530b4849a"><block><txt break.before="1">110</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.6-sec-oc.2-ssec.1-tbl-tblr-oc.3-tble3" guid="_b034e17b-af6a-42ce-80be-d503b52a60cb"><block><txt break.before="1">110</txt></block></entry><entry colname="4" align="center" valign="top" id="sch.6-sec-oc.2-ssec.1-tbl-tblr-oc.3-tble4" guid="_f1f0e8e3-77b0-4c8f-aa90-f2be9260f063"><block><txt break.before="1">110</txt></block></entry></row></tbody></tgroup></table></block></subclause><subclause id="sch.6-sec-oc.2-ssec.2" guid="_d14adb7d-8f15-4eeb-a1b0-dff4141d6027" affected.by.uncommenced="0" provision.type="other"><no>2</no><block><txt break.before="0">For water allocations in a water allocation group mentioned in table 2, column 1, the annual volume probability be at least the percentage stated for the group in table 2, column 2.</txt></block><block><table frame="all" colsep="0" rowsep="0" orient="port" id="sch.6-sec-oc.2-ssec.2-tbl" guid="_b434b50f-4554-4d6c-90a2-9634f4c28a75" heading.align="center" font.size="12.pt"><heading id="sch.6-sec-oc.2-ssec.2-tbl-he" guid="_e2739b8e-95d2-40ef-9336-be8ad4ac1d48">Table 2</heading><tgroup cols="2" colsep="0" rowsep="0" tgroupstyle="2columnRuled"><colspec colnum="1" colname="1" colwidth="2.458in" colsep="0"/><colspec colnum="2" colname="2" colwidth="2.542in" colsep="0"/><thead><row rowsep="0" id="sch.6-sec-oc.2-ssec.2-tbl-tblh-tblr" guid="_63e6405b-071f-4784-a8ad-de71c59f2458"><entry colname="1" colsep="1" rowsep="1" align="center" valign="top" id="sch.6-sec-oc.2-ssec.2-tbl-tblh-tblr-tble1" guid="_6f3b06ec-90ec-4b4e-a5da-b36606ae0efb"><block><txt break.before="1"><b>Column 1</b></txt></block></entry><entry colname="2" rowsep="1" align="center" valign="top" id="sch.6-sec-oc.2-ssec.2-tbl-tblh-tblr-tble2" guid="_88c75d8f-ceac-4c66-98c5-8f998aa819e6"><block><txt break.before="1"><b>Column 2</b></txt></block></entry></row><row rowsep="0" id="sch.6-sec-oc.2-ssec.2-tbl-tblh-tblr-oc.2" guid="_2ff9d407-65ff-47bf-8e7c-23b02329cbab"><entry colname="1" colsep="1" align="center" valign="top" id="sch.6-sec-oc.2-ssec.2-tbl-tblh-tblr-oc.2-tble1" guid="_4cd877cb-48b4-43c6-800e-474365468ca8"><block><txt break.before="1"><b>Water allocation group</b></txt></block></entry><entry colname="2" align="center" valign="top" id="sch.6-sec-oc.2-ssec.2-tbl-tblh-tblr-oc.2-tble2" guid="_affd1a2b-7eaf-40c2-bd1e-4d5e3d98c0f7"><block><txt break.before="1"><b>Annual volume probability percentage</b></txt></block></entry></row></thead><tbody><row rowsep="0" id="sch.6-sec-oc.2-ssec.2-tbl-tblr" guid="_15b4fdcc-badb-4a52-b873-b90980ece76f"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.6-sec-oc.2-ssec.2-tbl-tblr-tble1" guid="_daee2039-6c66-446a-93a2-4814dfdecec7"><block><txt break.before="1">A1 (Lower Burdekin)</txt></block></entry><entry colname="2" rowsep="1" align="center" valign="top" id="sch.6-sec-oc.2-ssec.2-tbl-tblr-tble2" guid="_62da9346-4eba-4da9-bc6d-355204d56720"><block><txt break.before="1">85</txt></block></entry></row><row rowsep="0" id="sch.6-sec-oc.2-ssec.2-tbl-tblr-oc.2" guid="_4d7ad7fd-db2c-48a4-b07b-136d253e8d7f"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.6-sec-oc.2-ssec.2-tbl-tblr-oc.2-tble1" guid="_ddf5a776-3428-4670-a8f3-11d5e2565de2"><block><txt break.before="1">B1 (Haughton)</txt></block></entry><entry colname="2" rowsep="1" align="center" valign="top" id="sch.6-sec-oc.2-ssec.2-tbl-tblr-oc.2-tble2" guid="_5d5d2984-cace-4875-b466-f61bd929939a"><block><txt break.before="1">85</txt></block></entry></row><row rowsep="0" id="sch.6-sec-oc.2-ssec.2-tbl-tblr-oc.3" guid="_8eb6a004-778e-4d71-92bb-62055e5f657d"><entry colname="1" colsep="1" align="left" valign="top" id="sch.6-sec-oc.2-ssec.2-tbl-tblr-oc.3-tble1" guid="_e59c7ef6-5220-48fb-afe0-3a12e62e52bb"><block><txt break.before="1">C1 (Bowen)</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.6-sec-oc.2-ssec.2-tbl-tblr-oc.3-tble2" guid="_b7f8ceae-4690-4282-9e61-e311c9bc7793"><block><txt break.before="1">75</txt></block></entry></row></tbody></tgroup></table></block></subclause></clause></part></schedule><schedule id="sch.7" guid="_c29581a9-ad18-414e-90d7-ca2f01a77800" type="schedule" status="repealed" affected.by.uncommenced="0" spent.amends="0" provision.type="other" toc="no"><no>Schedule 7</no><heading id="sch.7-he" guid="_abef53dd-49e2-4139-b442-55b193109a43">WATER LICENCES</heading><historynote><txt break.before="1"><b>sch 7 </b>om <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref> s 53</txt></historynote></schedule><schedule id="sch.8" guid="_fabf83f8-c56c-4fe0-b5f5-772e08d62a61" type="schedule" affected.by.uncommenced="0" spent.amends="0" numbering.style="manual" provision.type="other"><no>Schedule 8</no><heading id="sch.8-he" guid="_4f79b8de-0ad2-40ba-a4f4-c675ae1ef782">Rates and pump sizes</heading><sourceref id="sch.8-ref" guid="_3c613e60-672d-4017-98c1-930c414fb6b2" affected.by.uncommenced="0"><intref refid="sec.28-he" target.guid="_5c987766-f3ed-4e9f-b602-ee6da7ecfa2e" check="valid">sections&#160;65</intref>, <intref refid="sec.28-he" target.guid="_b4ec3958-f27e-4f51-bf38-4818a0d453c3" check="valid">66</intref>, <intref refid="sec.28-he" target.guid="_7a9477d8-4422-41db-bd86-14d18cd631c3" check="valid">73</intref> and <intref refid="sec.28-he" target.guid="_aea7cffb-e1f8-4480-bf52-5b909d1f483d" check="valid">74</intref></sourceref><block><table frame="all" colsep="1" rowsep="0" orient="port" id="sch.8-tbl" guid="_b1fb7773-7dd6-478f-a908-f636d6c8882b" heading.align="left" font.size="12.pt"><tgroup cols="3" colsep="1" rowsep="0" tgroupstyle="3columnRuled"><colspec colnum="1" colname="1" colwidth="1.538in"/><colspec colnum="2" colname="2" colwidth="1.778in"/><colspec colnum="3" colname="3" colwidth="1.684in"/><thead><row rowsep="0" id="sch.8-tbl-tblh-tblr" guid="_cdde294f-5091-459b-804c-be53b3adcb0c"><entry colname="1" rowsep="1" align="center" valign="top" id="sch.8-tbl-tblh-tblr-tble1" guid="_3acc87dc-90a4-4311-8bf7-bd41067b5cf5"><block><txt break.before="1"><b>Column 1</b></txt></block></entry><entry colname="2" rowsep="1" align="center" valign="top" id="sch.8-tbl-tblh-tblr-tble2" guid="_d993df51-b0dc-4738-861d-862c1d39bf7d"><block><txt break.before="1"><b>Column 2</b></txt></block></entry><entry colname="3" rowsep="1" align="center" valign="top" id="sch.8-tbl-tblh-tblr-tble3" guid="_93611f4e-ea8a-4f56-bf33-0239ab9d5c21"><block><txt break.before="1"><b>Column 3</b></txt></block></entry></row><row rowsep="0" id="sch.8-tbl-tblh-tblr-oc.2" guid="_2d9e174c-e1cd-487e-9a67-e545c002ffb9"><entry colname="1" align="center" valign="top" id="sch.8-tbl-tblh-tblr-oc.2-tble1" guid="_2b8689eb-fd70-4504-bd00-3d5659153ebd"><block><txt break.before="1"><b>Pump size (mm)</b></txt></block></entry><entry colname="2" align="center" valign="top" id="sch.8-tbl-tblh-tblr-oc.2-tble2" guid="_a41c6f98-280f-442f-9405-22bd90faf855"><block><txt break.before="1"><b>Maximum rate (litres/second)</b></txt></block></entry><entry colname="3" align="center" valign="top" id="sch.8-tbl-tblh-tblr-oc.2-tble3" guid="_bc881648-8a5d-4238-9709-2f6008e856ad"><block><txt break.before="1"><b>Daily volumetric limit (megalitres)</b></txt></block></entry></row></thead><tbody><row rowsep="1" id="sch.8-tbl-tblr" guid="_13ffaaad-3f72-49f8-a0b2-c8386d8da261"><entry colname="1" align="center" valign="top" id="sch.8-tbl-tblr-tble1" guid="_d2fedf1e-e3db-4f01-8bf0-ae1ab70726cb"><block><txt break.before="1">32</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.8-tbl-tblr-tble2" guid="_cf47384a-f001-47a8-90af-e006753479f9"><block><txt break.before="1">8</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.8-tbl-tblr-tble3" guid="_cb936c99-37f7-4f97-bbdd-f90193eca3d5"><block><txt break.before="1">0.6</txt></block></entry></row><row rowsep="1" id="sch.8-tbl-tblr-oc.2" guid="_9b6773ce-2516-4684-b151-268db87c1b4d"><entry colname="1" align="center" valign="top" id="sch.8-tbl-tblr-oc.2-tble1" guid="_1d09e890-7fc2-4be4-8fb9-1585a294eda7"><block><txt break.before="1">40</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.8-tbl-tblr-oc.2-tble2" guid="_cdbd2663-f023-4ef4-b3f1-568b06dc2b40"><block><txt break.before="1">16</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.8-tbl-tblr-oc.2-tble3" guid="_75734523-c548-4c53-a63b-40894f70006b"><block><txt break.before="1">1</txt></block></entry></row><row rowsep="1" id="sch.8-tbl-tblr-oc.3" guid="_1d4a9124-6d82-4a87-861b-fcec25e0f201"><entry colname="1" align="center" valign="top" id="sch.8-tbl-tblr-oc.3-tble1" guid="_32d8d6af-b264-4de8-8cb3-235620da9aaf"><block><txt break.before="1">50</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.8-tbl-tblr-oc.3-tble2" guid="_7fa7a489-478b-4add-8dc1-fa91cbc68b00"><block><txt break.before="1">25</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.8-tbl-tblr-oc.3-tble3" guid="_57609f03-3cdf-4288-a6a7-352f2e93f060"><block><txt break.before="1">1.5</txt></block></entry></row><row rowsep="1" id="sch.8-tbl-tblr-oc.4" guid="_ecc80f42-279c-4776-b007-9e965ddd6e45"><entry colname="1" align="center" valign="top" id="sch.8-tbl-tblr-oc.4-tble1" guid="_4c128b96-753a-4dcd-a1eb-cba0b74502ea"><block><txt break.before="1">65</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.8-tbl-tblr-oc.4-tble2" guid="_8c01451e-2929-42fa-b614-ee6955862821"><block><txt break.before="1">46</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.8-tbl-tblr-oc.4-tble3" guid="_8376f99e-1326-4dbc-b584-e50ddaee4854"><block><txt break.before="1">3.5</txt></block></entry></row><row rowsep="1" id="sch.8-tbl-tblr-oc.5" guid="_8e6c3a0e-e0bf-4c1d-b386-1bfa3c91fa23"><entry colname="1" align="center" valign="top" id="sch.8-tbl-tblr-oc.5-tble1" guid="_4f88bdc6-9e7d-4d56-9b20-0b2407edd074"><block><txt break.before="1">80</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.8-tbl-tblr-oc.5-tble2" guid="_9adabcd2-c7e4-4636-b786-b143bb755087"><block><txt break.before="1">65</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.8-tbl-tblr-oc.5-tble3" guid="_dac9b05d-b85d-4b79-aaaa-ae75cb9ab400"><block><txt break.before="1">3.9</txt></block></entry></row><row rowsep="1" id="sch.8-tbl-tblr-oc.6" guid="_fd4739fd-3ecc-48a0-a8b0-129005da8bed"><entry colname="1" align="center" valign="top" id="sch.8-tbl-tblr-oc.6-tble1" guid="_18f97602-d6f4-42fc-ba2f-69ca36d59171"><block><txt break.before="1">100</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.8-tbl-tblr-oc.6-tble2" guid="_9b0b9113-2cbb-4ce1-9a0f-10bd5fd5fadd"><block><txt break.before="1">95</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.8-tbl-tblr-oc.6-tble3" guid="_956a9fd7-33fc-4bd3-8641-fb6561068b70"><block><txt break.before="1">6.9</txt></block></entry></row><row rowsep="1" id="sch.8-tbl-tblr-oc.7" guid="_b53958a0-a37a-428b-b031-ff15367c26f1"><entry colname="1" align="center" valign="top" id="sch.8-tbl-tblr-oc.7-tble1" guid="_5f5420d8-6b1c-43f6-b2fe-860e3ccf85f7"><block><txt break.before="1">125</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.8-tbl-tblr-oc.7-tble2" guid="_fa7b6417-c995-4878-97d8-a1489a1ea5fe"><block><txt break.before="1">120</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.8-tbl-tblr-oc.7-tble3" guid="_02a33835-e9ff-4bee-bacb-5d4f580ecd30"><block><txt break.before="1">7.8</txt></block></entry></row><row rowsep="1" id="sch.8-tbl-tblr-oc.8" guid="_950ab375-ae94-4aeb-a095-46f205878cb3"><entry colname="1" align="center" valign="top" id="sch.8-tbl-tblr-oc.8-tble1" guid="_0d4cf201-3681-4706-be96-55c462a07ac0"><block><txt break.before="1">150</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.8-tbl-tblr-oc.8-tble2" guid="_f152074b-46f4-423c-97a3-c45234f83809"><block><txt break.before="1">150</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.8-tbl-tblr-oc.8-tble3" guid="_c15587a8-72cd-48f7-872c-25b5d607f2b0"><block><txt break.before="1">12.1</txt></block></entry></row><row rowsep="1" id="sch.8-tbl-tblr-oc.9" guid="_9ba0ed39-45d6-4eef-95ca-9a9880b9d105"><entry colname="1" align="center" valign="top" id="sch.8-tbl-tblr-oc.9-tble1" guid="_b225d672-ee43-447a-80d8-1e5dc3f9f2b0"><block><txt break.before="1">200</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.8-tbl-tblr-oc.9-tble2" guid="_d5285990-906b-42e7-869a-4dd589b2ed54"><block><txt break.before="1">220</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.8-tbl-tblr-oc.9-tble3" guid="_534c16c7-9253-4912-8a39-6d50168adf5a"><block><txt break.before="1">15.6</txt></block></entry></row><row rowsep="1" id="sch.8-tbl-tblr-oc.10" guid="_bbe5a169-0b7a-4247-bc11-6df1825e2966"><entry colname="1" align="center" valign="top" id="sch.8-tbl-tblr-oc.10-tble1" guid="_342d0fea-7905-4698-8e93-ab941b06b205"><block><txt break.before="1">250</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.8-tbl-tblr-oc.10-tble2" guid="_89456982-e56f-413a-94b1-a29e4e53a2c6"><block><txt break.before="1">300</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.8-tbl-tblr-oc.10-tble3" guid="_6f7fd0fc-b805-4175-85c3-a183aedcf866"><block><txt break.before="1">21.6</txt></block></entry></row><row rowsep="1" id="sch.8-tbl-tblr-oc.11" guid="_4117508a-6a04-4de7-940c-990b58f5e7b0"><entry colname="1" align="center" valign="top" id="sch.8-tbl-tblr-oc.11-tble1" guid="_281b4a4b-95cf-418b-aedd-2dd1796e42cb"><block><txt break.before="1">300</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.8-tbl-tblr-oc.11-tble2" guid="_8e3c18f9-4a79-43ec-836b-5eca8c005b24"><block><txt break.before="1">350</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.8-tbl-tblr-oc.11-tble3" guid="_1181719b-2a20-4454-ae6b-dd01e65cb635"><block><txt break.before="1">25.9</txt></block></entry></row><row rowsep="1" id="sch.8-tbl-tblr-oc.12" guid="_cd6ef99c-0659-4db0-a85f-ad1891869e7f"><entry colname="1" align="center" valign="top" id="sch.8-tbl-tblr-oc.12-tble1" guid="_1447cd1a-075e-44dd-b164-3a73bc0233a6"><block><txt break.before="1">350</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.8-tbl-tblr-oc.12-tble2" guid="_d860b8e9-ccbc-4a0b-b2e6-3abcbd7161a7"><block><txt break.before="1">400</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.8-tbl-tblr-oc.12-tble3" guid="_2e9382e8-eb70-49c4-b0a1-10f3cd157df2"><block><txt break.before="1">30.2</txt></block></entry></row><row rowsep="1" id="sch.8-tbl-tblr-oc.13" guid="_645deb9f-8d4f-42c8-9e87-4b191591628a"><entry colname="1" align="center" valign="top" id="sch.8-tbl-tblr-oc.13-tble1" guid="_3c399d61-8437-4c1f-b985-b30b27f72d9e"><block><txt break.before="1">375 to 400</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.8-tbl-tblr-oc.13-tble2" guid="_0a3ac816-00a3-49a1-aebd-f548e6111d96"><block><txt break.before="1">500</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.8-tbl-tblr-oc.13-tble3" guid="_b40f198a-b835-4c65-a80c-0c2af41002eb"><block><txt break.before="1">37.2</txt></block></entry></row><row rowsep="1" id="sch.8-tbl-tblr-oc.14" guid="_9646b216-3f2b-4acc-b451-ab266ea5872f"><entry colname="1" align="center" valign="top" id="sch.8-tbl-tblr-oc.14-tble1" guid="_76d4d080-e509-4ae9-b2aa-185f3a40673b"><block><txt break.before="1">500</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.8-tbl-tblr-oc.14-tble2" guid="_74e4c21b-fb87-4b2e-9559-65c1a151bc4a"><block><txt break.before="1">660</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.8-tbl-tblr-oc.14-tble3" guid="_e6e79e96-5be7-449e-b152-3272c4b57685"><block><txt break.before="1">47.5</txt></block></entry></row><row rowsep="1" id="sch.8-tbl-tblr-oc.15" guid="_b1110fbd-d31a-4fd3-9f64-3671257ea38d"><entry colname="1" align="center" valign="top" id="sch.8-tbl-tblr-oc.15-tble1" guid="_b43bea10-8312-49ed-81b8-1e2796f94a4d"><block><txt break.before="1">600 to 610</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.8-tbl-tblr-oc.15-tble2" guid="_600f0865-aa7e-449c-bf08-0b4a90f2e92d"><block><txt break.before="1">1200</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.8-tbl-tblr-oc.15-tble3" guid="_45b16530-cf55-481b-bd08-77b604c83e64"><block><txt break.before="1">86.4</txt></block></entry></row><row rowsep="1" id="sch.8-tbl-tblr-oc.16" guid="_857036f5-3ca0-4196-bc3a-9fc637b23b3b"><entry colname="1" align="center" valign="top" id="sch.8-tbl-tblr-oc.16-tble1" guid="_8284b237-9cbf-496a-90da-ee967814edfe"><block><txt break.before="1">650 to 660</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.8-tbl-tblr-oc.16-tble2" guid="_c53e1aa6-1575-407b-9dda-47ed9192336e"><block><txt break.before="1">1700</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.8-tbl-tblr-oc.16-tble3" guid="_b177c2ab-cc80-427f-be9a-e631450c69ac"><block><txt break.before="1">120</txt></block></entry></row><row rowsep="1" id="sch.8-tbl-tblr-oc.17" guid="_1ffa800f-010d-4ddf-b940-e5853d436afb"><entry colname="1" align="center" valign="top" id="sch.8-tbl-tblr-oc.17-tble1" guid="_a0265d66-a8da-4c4e-a0a3-d45c6088a4a2"><block><txt break.before="1">700 to 720</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.8-tbl-tblr-oc.17-tble2" guid="_17586ec7-c4fb-4b08-aa77-ff98867724c0"><block><txt break.before="1">2100</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.8-tbl-tblr-oc.17-tble3" guid="_a5be0f50-6d10-4ccc-a830-eaaa6039a23e"><block><txt break.before="1">150</txt></block></entry></row><row rowsep="1" id="sch.8-tbl-tblr-oc.18" guid="_f668daad-96dc-49ca-9df1-07ac4a332d33"><entry colname="1" align="center" valign="top" id="sch.8-tbl-tblr-oc.18-tble1" guid="_e240ff64-dc48-4f22-94d0-d39fb4961c32"><block><txt break.before="1">750 to 770</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.8-tbl-tblr-oc.18-tble2" guid="_911d611b-d60d-41d0-99ce-e4522d94a95f"><block><txt break.before="1">2500</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.8-tbl-tblr-oc.18-tble3" guid="_773c2cd5-ef21-4213-ba1e-633a1c5d1ce5"><block><txt break.before="1">180</txt></block></entry></row><row rowsep="0" id="sch.8-tbl-tblr-oc.19" guid="_87e40ec9-ca4a-4c73-867a-0fdaa509d3f2"><entry colname="1" align="center" valign="top" id="sch.8-tbl-tblr-oc.19-tble1" guid="_e099ae31-3283-4414-a48c-807468d285a0"><block><txt break.before="1">780 to 810</txt></block></entry><entry colname="2" align="center" valign="top" id="sch.8-tbl-tblr-oc.19-tble2" guid="_86e360b1-dd5f-442a-8c76-59af42e22475"><block><txt break.before="1">2800</txt></block></entry><entry colname="3" align="center" valign="top" id="sch.8-tbl-tblr-oc.19-tble3" guid="_17db4687-fbfa-447a-9992-04a7ca54be57"><block><txt break.before="1">200</txt></block></entry></row></tbody></tgroup></table></block></schedule><schedule id="sch.9" guid="_9f6bf1eb-f929-4589-ad98-f5e450700136" type="schedule" affected.by.uncommenced="0" spent.amends="0" numbering.style="manual" provision.type="other"><no>Schedule 9</no><heading id="sch.9-he" guid="_64bdb636-b592-4446-afc6-e3342b9a23d1">Formula</heading><sourceref id="sch.9-ref" guid="_5406f0ba-8f57-4596-9531-8e6be0f0e421" affected.by.uncommenced="0"><intref refid="sec.28-he" target.guid="_eb19ce39-4289-4bc5-b0f3-609fb4b855c1" check="valid">sch&#160;10</intref>, definition <intref check="invalid"><defterm id="sch.9-def.annualproportionalflowdeviation" guid="_49f4fff7-393e-4a98-ab02-2cfcbdcf5ebf" type="mention">annual proportional flow deviation</defterm></intref></sourceref><block><formulablock id="sch.9-eq" guid="_8d482455-6574-45c0-99be-e246a4e3d462" formula.align="center"><formula><graphic file.name="R16_1648-E1.tif" height="1.250in" width="4.183in" dpi="300" graphic.align="center"/></formula></formulablock><txt break.before="1">where—</txt><formulablock id="sch.9-eq-oc.2" guid="_71670531-81fc-4a50-8386-ae17befacdf2" formula.align="center"><deflist><definition id="sch.9-eq-oc.2-def.p_" guid="_1f26073d-b2e9-49b3-b462-8869fa633aef" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.9-eq-oc.2-def.p" guid="_1754f9bf-d7eb-4f71-b545-d7ad14194751" type="definition">p</defterm> means the number of years.</txt><txt break.before="1"><defterm id="sch.9-eq-oc.2-def.cij" guid="_ffeda86a-cf9b-4cff-928d-669d11e324dc" type="definition">c<sub>ij</sub></defterm> means the modelled flow for month <i>i</i> in year <i>j.</i></txt><txt break.before="1"><defterm id="sch.9-eq-oc.2-def.nij" guid="_7984f020-7ca4-4394-b17a-98271fd0e2f6" type="definition">n<sub>ij</sub></defterm> means the modelled natural flow for month <i>i</i> in year <i>j.</i></txt><txt break.before="1"><defterm id="sch.9-eq-oc.2-def.ni" guid="_77654729-1535-46fd-bf13-b99c1c95d656" type="definition">n<sub>i</sub></defterm> means the modelled natural flow for month <i>i</i> across <i>p</i> years.</txt></definition></deflist></formulablock></block></schedule><schedule id="sch.10" guid="_eb19ce39-4289-4bc5-b0f3-609fb4b855c1" type="schedule" affected.by.uncommenced="0" spent.amends="0" numbering.style="manual" provision.type="other"><no>Schedule 10</no><heading id="sch.10-he" guid="_a16fe434-3819-4166-a562-bc182509b696">Dictionary</heading><sourceref id="sch.10-ref" guid="_b1a365f4-7545-49e6-a194-d1929bafec26" affected.by.uncommenced="0"><intref refid="sec.28-he" target.guid="_89b262c2-3701-4ede-af5b-20c62004d572" check="valid">section&#160;3</intref></sourceref><block><deflist><definition id="sch.10-def.15yeardailyflowvolume_" guid="_62ce1049-c21c-4dc8-9f1e-378fd9b927ad" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.15yeardailyflowvolume" guid="_1733e22c-c28b-4ea4-a2b8-b6f114ede1d6" type="definition">1.5 year daily flow volume</defterm>, for a node, means the daily flow, at the node, that has a 67% probability of being reached at least once a year.</txt></definition><definition id="sch.10-def.5yeardailyflowvolume_" guid="_3a979465-a56d-4d35-868b-612b077ac939" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.5yeardailyflowvolume" guid="_9bd2e954-21a9-4935-99cd-a9acafd1da2a" type="definition">5 year daily flow volume</defterm>, for a node, means the daily flow, at the node, that has a 20% probability of being reached at least once a year.</txt></definition><definition id="sch.10-def.20yeardailyflowvolume_" guid="_9bf00fa3-f213-4c48-8fc3-bab5bb2833f0" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.20yeardailyflowvolume" guid="_f8dd7c7a-b056-4a71-b311-5ae902c577f5" type="definition">20 year daily flow volume</defterm>, for a node, means the daily flow, at the node, that has a 5% probability of being reached at least once a year.</txt></definition><definition id="sch.10-def.30unsupplementedwatersharingindex_" guid="_19355354-8616-4c77-ab43-9fc5912caa98" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.30unsupplementedwatersharingindex" guid="_43a54405-746f-460c-b94a-18df3c5c0fa1" type="definition">30% unsupplemented water sharing index</defterm>, for a group of water allocations, means the total volume of water simulated to have been taken annually under the allocations in at least 30% of years in the simulation period, if the allocations were in existence for the whole of the simulation period, expressed as a percentage of the simulated mean annual diversion for the allocations.</txt></definition><definition id="sch.10-def.50nonzerodailyflow_" guid="_e7c673d4-0af7-4a9d-bbe3-4bdd3aa7ef37" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.50nonzerodailyflow" guid="_4323639a-5fd3-41a8-82b3-f5eb93fd54c2" type="definition">50% non-zero daily flow</defterm>, for a node, means the daily flow, at the node, that is equalled or exceeded on 50% of the days on which there is a flow in the simulation period for the pre-development flow pattern.</txt></definition><definition id="sch.10-def.50unsupplementedwatersharingindex_" guid="_51492ac6-882c-4e64-9882-785bb17dd8d3" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.50unsupplementedwatersharingindex" guid="_0a71d491-bddc-436e-8016-86967154af87" type="definition">50% unsupplemented water sharing index</defterm>, for a group of water allocations, means the total volume of water simulated to have been taken annually under the allocations in at least 50% of years in the simulation period, if the allocations were in existence for the whole of the simulation period, expressed as a percentage of the simulated mean annual diversion for the allocations.</txt></definition><definition id="sch.10-def.70unsupplementedwatersharingindex_" guid="_7647011c-7471-4f1a-8df7-2c8fc50c8432" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.70unsupplementedwatersharingindex" guid="_df12cdf0-3360-4ee0-b8be-98ac3afc7923" type="definition">70% unsupplemented water sharing index</defterm>, for a group of water allocations, means the total volume of water simulated to have been taken annually under the allocations in at least 70% of years in the simulation period, if the allocations were in existence for the whole of the simulation period, expressed as a percentage of the simulated mean annual diversion for the allocations.</txt></definition><definition id="sch.10-def.80nonzerodailyflow_" guid="_cde110f8-556a-4e4e-8238-dc4f03d1fa96" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.80nonzerodailyflow" guid="_3f524840-1cd6-40bf-9471-0f60173436a1" type="definition">80% non-zero daily flow</defterm>, for a node, means the daily flow, at the node, that is equalled or exceeded on 80% of the days on which there is a flow in the simulation period for the pre-development flow pattern.</txt></definition><definition id="sch.10-def.adoptedmiddlethreaddistance_" guid="_98b9d4d3-a32f-4543-9435-383cade53258" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.adoptedmiddlethreaddistance" guid="_89d614b1-e33e-4c4a-8ceb-c719b79afdae" type="definition">adopted middle thread distance</defterm> means the distance in kilometres, measured along the middle of a watercourse, that a specific point in the watercourse is, at the commencement of this plan, from—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.10-def.adoptedmiddlethreaddistance-para1.a" guid="_02d0bea6-6fd2-4367-b78f-a4167aa2027f" provision.type="other"><no>(a)</no><block><txt break.before="0">the watercourse’s mouth; or</txt></block></li><li id="sch.10-def.adoptedmiddlethreaddistance-para1.b" guid="_7ce37f2a-3464-4129-9b46-aba94c2e5326" provision.type="other"><no>(b)</no><block><txt break.before="0">if the watercourse is not a main watercourse—the watercourse’s confluence with its main watercourse.</txt></block></li></list></definition><definition id="sch.10-def.AMTD_" guid="_0da86629-5ac1-4e35-8c2b-c689ce838965" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.AMTD" guid="_c4ce6eca-fa6c-460f-a7bb-de2c7f41576c" type="definition">AMTD</defterm> means adopted middle thread distance.</txt></definition><definition id="sch.10-def.annualflowvolume_" guid="_2414758e-b36b-44bb-ade7-cfb408fdca05" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.annualflowvolume" guid="_22b8a9d7-c3ec-4fe9-9298-3ddb2b7d5566" type="definition">annual flow volume</defterm>, for a node, means the total volume of flow, at the node, in a period of 12 months starting on 1 July.</txt></definition><definition id="sch.10-def.annualproportionalflowdeviation_" guid="_d240bfa2-a3f9-4c69-a4ef-46fc39001d73" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.annualproportionalflowdeviation" guid="_e401bd52-2f29-497d-957f-f468c19ffcc9" type="definition">annual proportional flow deviation</defterm>, for a node, means the statistical measure of changes to flow season and volume in the simulation period, at the node, calculated using the formula in <intref refid="sec.28-he" target.guid="_9f6bf1eb-f929-4589-ad98-f5e450700136" check="valid">schedule&#160;9</intref>.</txt></definition><definition id="sch.10-def.annualsupplementedwatersharingindex_" guid="_735c26de-a136-401f-8a85-7379b6b8de64" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.annualsupplementedwatersharingindex" guid="_20d8a3d2-a6c0-4d67-9481-5ecdb1a3ad1a" type="definition">annual supplemented water sharing index</defterm>, for water allocations to take supplemented water in a particular priority group, means the percentage of years in the simulation period in which the allocations are fully supplied.</txt></definition><definition id="sch.10-def.annualvariability_" guid="_87c222d3-2114-4d52-9c1f-0f1469905a99" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.annualvariability" guid="_d6bc465a-611e-4961-b54a-983d398f8a75" type="definition">annual variability</defterm>, for a flow at a point in a watercourse, means the amount of change in the flow that happens between years.</txt></definition><definition id="sch.10-def.annualvolumeprobability_" guid="_06af0df1-90b9-4217-89d0-8223baabe010" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.annualvolumeprobability" guid="_a15e5812-aa61-4918-be83-faccb030502f" type="definition">annual volume probability</defterm>, for a group of water allocations, means the percentage of years in the simulation period in which the volume of water that may be taken by the group is at least the total of the nominal volumes for the allocations in the group.</txt></definition><definition id="sch.10-def.annualvolumetriclimit_" guid="_00e2929d-a659-4e0a-8c9d-1edf0509541b" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.annualvolumetriclimit" guid="_880494dd-1c88-4b98-bd22-4bf16651e44d" type="definition">annual volumetric limit</defterm>, for a water entitlement, means the maximum volume of water that may be taken under the entitlement—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.10-def.annualvolumetriclimit-para1.a" guid="_85043470-6e69-43f2-981e-bd8b87d46b33" provision.type="other"><no>(a)</no><block><txt break.before="0">for a water entitlement that is a water licence—in the water year for the licence; or</txt></block></li><li id="sch.10-def.annualvolumetriclimit-para1.b" guid="_8ca538af-2428-4f02-876e-5def619086fc" provision.type="other"><no>(b)</no><block><txt break.before="0">for other water entitlements—in the water year for the resource operations plan.</txt></block></li></list></definition><definition id="sch.10-def.authorisation_" guid="_d3afd4cf-b01e-4f45-ad49-aeda903dd230" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.authorisation" guid="_a1d8d126-cfaf-401b-b88e-e002d3fa8ee0" type="definition">authorisation</defterm> means a licence, permit, interim water allocation or other authority to take water given under the <legref jurisd="QLD" type="act" target.doc.id="UNKNOWN" check="invalid">Act</legref> or the repealed Act, other than a permit for stock or domestic purposes.</txt></definition><definition id="sch.10-def.averagevolumeofwaterallowedtobetakenunderauthorisations_" guid="_507bfbc2-635b-4177-8de7-375171b42b01" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.averagevolumeofwaterallowedtobetakenunderauthorisations" guid="_47270c12-4d31-4f39-bb4d-6095bd45b4fb" type="definition">average volume of water allowed to be taken under authorisations</defterm> means the total volume of water simulated to have been taken under the authorisations during the simulation period if the authorisations were in existence for the whole of the simulation period, divided by the number of years in the simulation period.</txt></definition><definition id="sch.10-def.BowenBrokenWaterSupplyScheme_" guid="_10035cd8-db68-45b4-ab7b-3fe49b2235ef" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.BowenBrokenWaterSupplyScheme" guid="_5f999c7a-185b-4c09-9e79-402ce5db9750" type="definition">Bowen Broken Water Supply Scheme</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.10-def.BowenBrokenWaterSupplyScheme-para1.a" guid="_1a9ea97e-cd98-4399-8876-aa6168321b34" provision.type="other"><no>(a)</no><block><txt break.before="0">until the resource operations plan commences—the scheme for the supply of water under the interim resource operations licence for the Bowen Broken Water Supply Scheme; and</txt></block></li><li id="sch.10-def.BowenBrokenWaterSupplyScheme-para1.b" guid="_406420fa-49ca-4d5e-9727-36ff8d839d74" provision.type="other"><no>(b)</no><block><txt break.before="0">on and from the day the resource operations plan commences—the scheme for the supply of water under the resource operations licence for the Bowen Broken Water Supply Scheme.</txt></block></li></list></definition><definition id="sch.10-def.BurdekinHaughtonWaterSupplyScheme_" guid="_6840d524-8050-4067-b088-f5f397235d25" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.BurdekinHaughtonWaterSupplyScheme" guid="_d06f44d2-0418-4709-9919-3d495a878439" type="definition">Burdekin Haughton Water Supply Scheme</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.10-def.BurdekinHaughtonWaterSupplyScheme-para1.a" guid="_73fba9d0-3cfe-4214-a0db-36a9eadd3a3d" provision.type="other"><no>(a)</no><block><txt break.before="0">until the resource operations plan commences—the scheme for the supply of water under the interim resource operations licence for the Burdekin Haughton Water Supply Scheme; and</txt></block></li><li id="sch.10-def.BurdekinHaughtonWaterSupplyScheme-para1.b" guid="_b2fd0c63-cca5-4e2a-9359-c0956e5e7b92" provision.type="other"><no>(b)</no><block><txt break.before="0">on and from the day the resource operations plan commences—the scheme for the supply of water under the resource operations licence for the Burdekin Haughton Water Supply Scheme.</txt></block></li></list></definition><definition id="sch.10-def.dailyflow_" guid="_44d5ac46-62f4-4ea9-81d5-cd44cc871371" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.dailyflow" guid="_1d0ddd0c-0925-4d7f-ad12-069f5a82bd8a" type="definition">daily flow</defterm>, for a node, means the volume of water that flows past the node in a day.</txt></definition><definition id="sch.10-def.dailyvolumetriclimit_" guid="_3c090e3b-b781-4712-bda9-be086f6ac7e0" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.dailyvolumetriclimit" guid="_a697b306-ef4e-423c-be8e-09373e79feb3" type="definition">daily volumetric limit</defterm>, for a water entitlement, means the maximum volume of water that may be taken under the entitlement in a day.</txt></definition><definition id="sch.10-def.discharge_" guid="_b1034445-e15b-49b0-a64e-590e8325392e" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.discharge" guid="_5dab0e33-3eae-4d43-9109-db58d9f67d52" type="definition">discharge</defterm>, for a flow at a point in a watercourse, means the rate at which water passes the point, measured in cubic metres a second or megalitres a day.</txt></definition><definition id="sch.10-def.ecologicalassets_" guid="_3539c336-dcd1-4f1e-9d22-d99a5531e113" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.ecologicalassets" guid="_65a6d532-0373-466c-bf60-f30b2b15365f" type="definition">ecological assets</defterm> include a species, a group of species, a biological function, an ecosystem and a place of natural value.</txt></definition><definition id="sch.10-def.eventduration_" guid="_38e926a1-4cdb-449b-bfb1-cf7ca148955a" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.eventduration" guid="_5e0c6567-2cfc-49dc-a4b9-7927b9c1b51f" type="definition">event duration</defterm>, for a flow at a point in a watercourse, means the period of time when the discharge is greater than or less than the level necessary for a particular ecological process to happen.</txt></definition><definition id="sch.10-def.existingoverlandflowworks_" guid="_bd022f0e-3f70-44a1-a600-7dba43f50ec0" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.existingoverlandflowworks" guid="_1ef629f2-c25a-4b79-9f56-6412e5b0d57f" type="definition">existing overland flow works</defterm> means works that allow the taking of overland flow water and were—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.10-def.existingoverlandflowworks-para1.a" guid="_d19951c0-2e76-45ba-bd3a-f2dba911ae2b" provision.type="other"><no>(a)</no><block><txt break.before="0">in existence on 17 January 2002; or</txt></block></li><li id="sch.10-def.existingoverlandflowworks-para1.b" guid="_fc0c58f3-561e-4f95-9d43-93ced097f941" provision.type="other"><no>(b)</no><block><txt break.before="0">started, but not completed by 17 January 2002 and—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.10-def.existingoverlandflowworks-para1.b-para2.i" guid="_9428f42e-d304-4f2b-9c3a-5959afbd63c6" provision.type="other"><no>(i)</no><block><txt break.before="0">if a variation to a moratorium notice was granted for the works under <legref jurisd="QLD" type="act" refid="sec.27" target.doc.id="UNKNOWN" check="invalid">section&#160;27</legref> of the <legref jurisd="QLD" type="act" target.doc.id="UNKNOWN" check="invalid">Act</legref>—have been, or are being, completed in accordance with the moratorium notice, as varied; or</txt></block></li><li id="sch.10-def.existingoverlandflowworks-para1.b-para2.ii" guid="_c1a020e8-52da-4b53-8b22-a69e0e8c2886" provision.type="other"><no>(ii)</no><block><txt break.before="0">if subparagraph (i) does not apply—were completed by 30 June 2002; or</txt></block></li></list></block></li><li id="sch.10-def.existingoverlandflowworks-para1.c" guid="_947c7f7e-bb68-4277-bf1a-504e6fbf9211" provision.type="other"><no>(c)</no><block><txt break.before="0">for works to which the moratorium notice published on 17 January 2002 and amended on 25 July 2002 did not apply—started before the commencement of this plan.</txt></block></li></list><historynote><txt break.before="1">def <defterm guid="_f0e8ca64-10e5-47fd-948e-1bc3fedc9a2e" type="mention">existing overland flow works</defterm> amd <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref> s 54(1)</txt></historynote></definition><definition id="sch.10-def.flowregime_" guid="_86f9a8b4-9145-4881-bb5e-3bcea8c42c50" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.flowregime" guid="_37931b34-4cf3-4260-9d1e-802b2448cea4" type="definition">flow regime</defterm> means the entire range of flows at a point in a watercourse including variations in the watercourse height, discharge, seasonality, annual variability and event duration.</txt></definition><definition id="sch.10-def.GiruBenefitedGroundwaterArea_" guid="_f61caa42-e7c0-44a3-8080-52999b47e71f" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.GiruBenefitedGroundwaterArea" guid="_41bb1764-9676-4474-ba1c-2e8c2d33fd74" type="definition">Giru Benefited Groundwater Area</defterm> means the area shown on the map in <intref refid="sec.28-he" target.guid="_ad843ccb-94e9-426f-8612-659786e1a1be" check="valid">schedule&#160;3</intref> as the Giru Benefited Groundwater Area.</txt></definition><definition id="sch.10-def.hydraulichabitatrequirements_" guid="_f35238e8-0de7-410a-be06-07207130b367" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.hydraulichabitatrequirements" guid="_1a2a7529-66d0-4f72-85bb-b6ae10dbca47" type="definition">hydraulic habitat requirements</defterm>, of an ecological asset, are the hydraulic or physical attributes of the flow regime that are—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.10-def.hydraulichabitatrequirements-para1.a" guid="_9d95ee07-1328-49db-9ec8-d1f31da6fdb5" provision.type="other"><no>(a)</no><block><txt break.before="0">required for a particular biological process or response to happen in relation to the asset; or</txt></block></li><li id="sch.10-def.hydraulichabitatrequirements-para1.b" guid="_23c55054-fed7-4a35-a906-82e5514f49e3" provision.type="other"><no>(b)</no><block><txt break.before="0">necessary to maintain the long-term biological integrity of the asset.</txt></block></li></list></definition><definition id="sch.10-def.IQQMcomputerprogram_" guid="_60f3d48d-4bc4-4ba3-84fa-934414ba40ae" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.IQQMcomputerprogram" guid="_e3610193-5196-4257-bbf4-b93163213c36" type="definition">IQQM computer program</defterm> means the department’s Integrated Quantity and Quality Modelling computer program, and associated statistical analysis and reporting programs, that simulate daily stream flows, flow management, storages, releases, instream infrastructure, water diversions, water demands and other hydrologic events in the plan area.</txt></definition><definition id="sch.10-def.meanannualflow_" guid="_a756f579-eebc-40d3-9f5e-8940166535bc" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.meanannualflow" guid="_616114ca-9a6e-4d90-959b-3138a0c82ce9" type="definition">mean annual flow</defterm>, for a node, means the total volume of flow, at the node, in the simulation period divided by the number of years in the simulation period.</txt></definition><definition id="sch.10-def.medianannualflow_" guid="_8cdbe685-d4ef-48a7-a4fa-bedfeca00c6c" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.medianannualflow" guid="_7248d1e7-9976-4f18-aaab-a104a305e862" type="definition">median annual flow</defterm>, for a node, means the annual flow volume, at the node, that is equalled or exceeded in 50% of years in the simulation period.</txt></definition><definition id="sch.10-def.mining_" guid="_e3d077af-27ff-4430-9418-9c2416292460" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.mining" guid="_e52aa42c-7e1e-4557-a13f-53d4febdb03d" type="definition">mining </defterm>includes prospecting or exploring—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.10-def.mining-para1.a" guid="_ff88c0b3-557f-4bf8-95fb-57a39d522ac3" provision.type="other"><no>(a)</no><block><txt break.before="0">under the <legref jurisd="QLD" type="act" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" check="valid"><name emphasis="yes">Mineral Resources Act 1989</name></legref> or another Act relating to mining; and</txt></block></li><li id="sch.10-def.mining-para1.b" guid="_51febec4-b0ae-4b31-95bf-2a3ae8cc4994" provision.type="other"><no>(b)</no><block><txt break.before="0">on land to which a mining tenement under the <legref jurisd="QLD" type="act" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" check="valid"><name emphasis="yes">Mineral Resources Act 1989</name></legref> relates.</txt></block></li></list></definition><definition id="sch.10-def.monthlysupplementedwatersharingindex_" guid="_70bfe76f-7bbc-46f8-b628-dc552a89d2d1" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.monthlysupplementedwatersharingindex" guid="_a20ecd61-3e6a-4474-8c4a-7fe558f894c3" type="definition">monthly supplemented water sharing index</defterm>, for water allocations to take supplemented water in a particular priority group, means the percentage of months in the simulation period in which the allocations are fully supplied.</txt></definition><definition id="sch.10-def.node_" guid="_a8279984-b8db-4a84-8c3c-db3dfea7b36f" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.node" guid="_d9475dda-05bf-4663-a413-3cb173e60e5c" type="definition">node</defterm> see <intref refid="sec.28-he" target.guid="_c503b309-e58e-4003-826a-0839853568eb" check="valid">section&#160;9</intref>.</txt></definition><definition id="sch.10-def.operatorofinfrastructureforinterferingwithwater_" guid="_edbdb5b5-1efe-46fc-958c-abf02b113726" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.operatorofinfrastructureforinterferingwithwater" guid="_5ab530bf-74c7-4b28-a307-84287400f2db" type="definition">operator of infrastructure for interfering with water</defterm>, for part 6, means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.10-def.operatorofinfrastructureforinterferingwithwater-para1.a" guid="_8c61edc4-a67a-4cb0-8b6b-1450546fe00d" provision.type="other"><no>(a)</no><block><txt break.before="0">the holder of a resource operations licence or a distribution operations licence; or</txt></block></li><li id="sch.10-def.operatorofinfrastructureforinterferingwithwater-para1.b" guid="_902a5ba7-7ac6-434a-a355-4b8fac66ee1c" provision.type="other"><no>(b)</no><block><txt break.before="0">an operator of infrastructure for interfering with water, mentioned in the resource operations plan.</txt></block></li></list></definition><definition id="sch.10-def.periodofnoflow_" guid="_457595a7-6c12-4ef6-a6ce-c04d582c178b" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.periodofnoflow" guid="_64bd6940-bade-4a36-a5cf-20bf910ddf4b" type="definition">period of no flow</defterm>, for a node, means a period in which the watercourse has ceased to flow at the node.</txt></definition><definition id="sch.10-def.planarea_" guid="_aaddf32f-8203-4b10-a3a1-9035fa42c213" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.planarea" guid="_1ad26045-8770-49f5-a34b-2212c22ecef8" type="definition">plan area</defterm> means the area shown as the plan area on the map in <intref refid="sec.28-he" target.guid="_1793060e-0270-499c-9580-309c3f61f941" check="valid">schedule&#160;1</intref>.</txt></definition><definition id="sch.10-def.predevelopmentflowpattern_" guid="_263fa6d0-a3a2-49aa-acdd-10d62d011154" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.predevelopmentflowpattern" guid="_3bfc7895-6d10-42de-bd3f-09d7bfaaecfc" type="definition">pre-development flow pattern</defterm> means the pattern of water flows, during the simulation period, decided by the chief executive using the IQQM computer program as if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.10-def.predevelopmentflowpattern-para1.a" guid="_e762e8b3-6407-4ee2-b624-17f2d01fd9af" provision.type="other"><no>(a)</no><block><txt break.before="0">there were no dams or other water infrastructure in the plan area; and</txt></block></li><li id="sch.10-def.predevelopmentflowpattern-para1.b" guid="_6a1e40e9-38ce-4b8f-94ca-0fc30a17d07f" provision.type="other"><no>(b)</no><block><txt break.before="0">no water was taken under authorisations in the plan area.</txt></block></li></list></definition><definition id="sch.10-def.relateddevelopmentpermit_" guid="_e84eb205-3ab3-4855-82e7-6ba3bc23e195" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.relateddevelopmentpermit" guid="_006687b5-ac5f-45da-8461-8d52141d79d3" type="definition">related development permit</defterm>, for an authorisation, means the development permit for the works for taking water under the authorisation.</txt></definition><definition id="sch.10-def.resourceoperationsplan_" guid="_55dba337-fa49-41af-bb3e-96a73cb2b6ea" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.resourceoperationsplan" guid="_890c169b-37c7-40e3-9cb8-556d017981eb" type="definition">resource operations plan</defterm> means the resource operations plan to implement this plan.</txt></definition><definition id="sch.10-def.seasonality_" guid="_6354ca27-d893-424c-9728-d1478d28bdb1" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.seasonality" guid="_ecb251d7-7c7b-4dc1-8a95-954c83f626ae" type="definition">seasonality</defterm>, for a flow at a point in a watercourse, means the time of year when the flow happens.</txt></definition><definition id="sch.10-def.simulatedmeanannualdiversion_" guid="_04116f8c-719b-4bcd-943d-72a6a0ef21df" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.simulatedmeanannualdiversion" guid="_a7169334-8801-4f5a-a0e4-fba7de0ac271" type="definition">simulated mean annual diversion</defterm>, for an authorisation or group of authorisations, means the total volume of water simulated to have been taken under the authorisations, if the authorisations were in existence for the whole of the simulation period, divided by the number of years in the simulation period.</txt></definition><definition id="sch.10-def.simulationperiod_" guid="_0f441e06-50d0-4a67-91f3-653076ae648f" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.simulationperiod" guid="_3f452064-8944-404d-af1e-5a646fd66c39" type="definition">simulation period</defterm> means the period from 1 January 1890 to 31 December 2004.</txt></definition><definition id="sch.10-def.started_" guid="_a7238762-dcc7-4bdf-bb7b-d3862646182e" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.started" guid="_73005225-5b87-45ba-a42e-a7ae33b98754" type="definition">started</defterm>, for existing overland flow works, means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.10-def.started-para1.a" guid="_a000436b-19e7-46ef-972b-3a46c98826dd" provision.type="other"><no>(a)</no><block><txt break.before="0">construction of the works had physically begun or, if construction had not physically begun, a contract had been entered into to begin construction; and</txt></block></li><li id="sch.10-def.started-para1.b" guid="_6314efd7-506e-433e-80c1-29011fb979f4" provision.type="other"><no>(b)</no><block><txt break.before="0">an independently verifiable construction program existed for progressive construction towards completion of the works; and</txt></block></li><li id="sch.10-def.started-para1.c" guid="_d011c367-10be-4e4c-9a2e-d613727a56eb" provision.type="other"><no>(c)</no><block><txt break.before="0">detailed design plans existed showing, among other things, the extent of the works; and</txt></block></li><li id="sch.10-def.started-para1.d" guid="_d4c084e5-d10c-46e2-9c4b-1028981e9bd9" provision.type="other"><no>(d)</no><block><txt break.before="0">if a permit under the <legref jurisd="QLD" type="act" target.doc.id="act-1993-070" target.version.series="b362f83d-41ef-49f6-8d07-8958e78b7fdd" check="valid"><name emphasis="yes">Local Government Act 1993</name></legref>, <legref jurisd="QLD" type="act" refid="sec.940" target.doc.id="act-1993-070" target.version.series="b362f83d-41ef-49f6-8d07-8958e78b7fdd" check="invalid">section&#160;940</legref>, was required for the works—the permit had been issued; and</txt></block></li><li id="sch.10-def.started-para1.e" guid="_ff4b8b73-a2ad-4169-b353-b39b8bbc7eeb" provision.type="other"><no>(e)</no><block><txt break.before="0">if a development permit was required for the works—the permit had been given.</txt></block></li></list></definition><definition id="sch.10-def.subcatchmentarea_" guid="_114ee70e-5b74-4e81-922c-2498426ac6a0" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.subcatchmentarea" guid="_b9174558-6dc3-4685-b2e6-1a3bc2ebe6cd" type="definition">subcatchment area</defterm> see <intref refid="sec.28-he" target.guid="_0979af88-643c-4559-ad00-9482b3b94b5e" check="valid">section&#160;5</intref>.</txt></definition><definition id="sch.10-def.SunWaterreserve_" guid="_7b9c189e-dbb9-4094-8d56-f4a44986d785" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.SunWaterreserve" guid="_7d43d696-58c4-4d0e-b34f-e9aadc09fd64" type="definition">SunWater reserve </defterm>see <intref refid="sec.28-he" target.guid="_8f95c0a2-0491-4994-a905-09977055ec73" check="valid">section&#160;30</intref><intref refid="sec.28-he" target.guid="_6fbec8ba-8944-4e63-b889-b1f20706e131" check="valid">(c)</intref>.</txt><historynote><txt break.before="1">def <defterm guid="_da8d965a-c13a-46ed-b3e8-dc058d7f51da" type="mention">SunWater reserve</defterm> amd <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0142" target.version.series="7c8d8f05-0cf7-4194-bbf9-5a200d8a8aab" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;142</legref> s 54(2)</txt></historynote></definition><definition id="sch.10-def.supplementationpoint_" guid="_f3dc0d9a-f044-4c18-b04e-dca95dc351ad" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.supplementationpoint" guid="_b644d3f5-3e12-4572-80be-b1824bfa112b" type="definition">supplementation point</defterm>, for a watercourse, means the most upstream point on the watercourse at which the natural flow of water in the watercourse is supplemented by water from a dam or weir.</txt></definition><definition id="sch.10-def.supplementedwater_" guid="_e78b19f3-a2d6-4855-b187-b45bd96148a6" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.supplementedwater" guid="_f305d847-15c0-420c-90a6-f09a1620ef5f" type="definition">supplemented water</defterm> means water supplied under an interim resource operations licence, resource operations licence or other authority to operate water infrastructure.</txt></definition><definition id="sch.10-def.thisplan_" guid="_026509b5-d76d-4682-9654-b002d688d8f3" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.thisplan" guid="_657e1a77-aa0b-4fe7-ad88-1471a9c715ad" type="definition">this plan</defterm> means this water resource plan.</txt></definition><definition id="sch.10-def.unsupplementedwater_" guid="_b4e128d8-6f67-4c99-959c-0a2e4c2db465" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.unsupplementedwater" guid="_1a90c437-7d83-4aee-aea2-39ab2b7a949e" type="definition">unsupplemented water</defterm> means water that is not supplemented water.</txt></definition><definition id="sch.10-def.waterflowseason_" guid="_eb02a2d4-e678-43e9-bf3e-8490160b9e4b" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.waterflowseason" guid="_46c83bc2-c96d-44c9-abf9-63f29e2063a6" type="definition">water flow season</defterm> means any of the following periods in a year—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.10-def.waterflowseason-para1.a" guid="_bee96f04-6345-4280-b89f-b51f5c508b50" provision.type="other"><no>(a)</no><block><txt break.before="0">the period from 1 January to 31 March (<defterm id="sch.10-def.waterflowseason-def.JanuaryMarchwaterflowseason" guid="_b4d18696-0dfe-46f9-a860-9894d2045a94" type="definition">January–March water flow season</defterm>);</txt></block></li><li id="sch.10-def.waterflowseason-para1.b" guid="_38ed0e9d-55aa-4b5b-a2ee-7b2699c4edfb" provision.type="other"><no>(b)</no><block><txt break.before="0">the period from 1 April to 30 June (<defterm id="sch.10-def.waterflowseason-def.AprilJunewaterflowseason" guid="_27bd5235-0f78-457d-9bc9-37a3b9770f97" type="definition">April–June water flow season</defterm>);</txt></block></li><li id="sch.10-def.waterflowseason-para1.c" guid="_93b37257-6a56-4896-b25f-171088708d9c" provision.type="other"><no>(c)</no><block><txt break.before="0">the period from 1 July to 30 September (<defterm id="sch.10-def.waterflowseason-def.JulySeptemberwaterflowseason" guid="_dc5f6a19-d073-4f44-8830-88506fd8a154" type="definition">July–September water flow season</defterm>);</txt></block></li><li id="sch.10-def.waterflowseason-para1.d" guid="_0164868c-fabc-4ab9-9af2-26db443b8e74" provision.type="other"><no>(d)</no><block><txt break.before="0">the period from 1 October to 31 December (<defterm id="sch.10-def.waterflowseason-def.OctoberDecemberwaterflowseason" guid="_14250a11-8963-4d30-9cfb-c0510a8ecc62" type="definition">October–December water flow season</defterm>).</txt></block></li></list></definition><definition id="sch.10-def.waterhole_" guid="_124f8206-3427-4ec9-9a3b-c2aac0f64fd3" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.waterhole" guid="_7ee3e53c-1055-4afa-a867-d1cda5481100" type="definition">waterhole</defterm> means a part of a watercourse that contains water after the watercourse ceases to flow, other than a part of a watercourse that is within the storage area of a dam on the watercourse.</txt></definition><definition id="sch.10-def.watermanagementarea_" guid="_6d4bd159-ca05-4254-a69f-f3bd52b60bdd" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.watermanagementarea" guid="_5ae7a360-e6a5-4839-8ea8-7dc47808fc3c" type="definition">water management area</defterm> see <intref refid="sec.28-he" target.guid="_3e97b1ad-93d6-4f0c-ad26-6db809d6af2d" check="valid">section&#160;6</intref>.</txt></definition><definition id="sch.10-def.worksthatallowthetakingofoverlandflowwater_" guid="_2a6336cd-6768-4d38-a73f-67172b7dfa6f" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.10-def.worksthatallowthetakingofoverlandflowwater" guid="_f06bf110-dd84-4e6c-a6f0-13a56a9d1f49" type="definition">works that allow the taking of overland flow water</defterm> include—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.10-def.worksthatallowthetakingofoverlandflowwater-para1.a" guid="_3b086ca6-f0d1-42d8-b219-1b639bd60fc5" provision.type="other"><no>(a)</no><block><txt break.before="0">storages, sumps, drains, embankments, channels and pumps for taking, or that can be used for taking, overland flow water; and</txt></block></li><li id="sch.10-def.worksthatallowthetakingofoverlandflowwater-para1.b" guid="_5f160bef-25bd-4458-a6d7-9d372b735370" provision.type="other"><no>(b)</no><block><txt break.before="0">storages that are connected to the works mentioned in paragraph (a); and</txt></block></li><li id="sch.10-def.worksthatallowthetakingofoverlandflowwater-para1.c" guid="_3a2b6853-5f6a-4f1a-90d0-c0c2b87127ba" provision.type="other"><no>(c)</no><block><txt break.before="0">works that make, or that can be used to make, the original connection between the storages mentioned in paragraph (b) and the works mentioned in paragraph (a).</txt></block></li></list></definition></deflist></block></schedule></schedules></subordleg>