<?xml version="1.0" encoding="utf-8"?>
<!DOCTYPE subordleg PUBLIC "-//OQPC//DTD QuILLS Subordinate Legislation//EN" "Subordleg.dtd">
<!--************************************************************************************************************-->
<!--                                              DISCLAIMER                                                    -->
<!---->
<!--Queensland does not accept responsibility for the accuracy or completeness of material on this website      -->
<!--(or any other website referred to on this website) except as set out below. Users should exercise their     -->
<!--own skill and care in the use of the material.                                                              -->
<!---->
<!--No warranty is given that the material located on this site, or on any other site referred to on this site, -->
<!--is free from error or omission. Users should exercise their own skill and care with respect to the use of   -->
<!--the material. Accordingly, the State of Queensland and its servants and agents expressly disclaim liability -->
<!--for any act done or omission made in reliance on any such material and any consequences of any such act or  -->
<!--omission. This notice must not be erased.                                                                   -->
<!---->
<!--************************************************************************************************************-->
<subordleg title="Coastal Protection and Management Regulation 2003" year.citation="2003" no="203" enabling.title="Coastal Protection and Management Act 1995" enabling.acts="UNKNOWN" sub.leg.type="reg" amending="none" print.type="reprint" first.valid.date="2017-07-03T00:00:00+10:00" end.valid.date="2017-08-31T00:00:00+10:00" published.date="2003-09-05T00:00:00+10:00" published.how="website" published.ref="pp 57–8" expiry.date="2017-08-31T00:00:00+10:00" stage.repeal="1" stage.repeal.original.date="2014-09-01T00:00:00+10:00" stage.repeal.postpone.date="2017-08-31T00:00:00+10:00" repeal.date="2017-08-31T00:00:00+10:00" repealed.by="stagerepeal" repealing.id="act-1992-022" made.by.position="Governor in Council" id="sl-2003-0203" version.desc.id="fa1826a5-3dfa-4aae-ac9c-84136138c295" version.series.id="bffd5976-0c46-427a-974b-50342a51f2b2" publication.date="2017-08-30" in.force="allinforce"><coverdata id="cd" guid="_57ef3b1b-95a5-49e4-b830-992a2d1fcbe1"><subtitle id="cd-sut" guid="_66aee8fb-8599-4053-a861-fb1a75d66424">Coastal Protection and Management Act 1995</subtitle><statusrecord id="cd-status" guid="_916f50d3-751b-4ca7-b8a0-63e19d6ce538"><heading id="cd-status-he" guid="_a1d6ac81-6723-4ff1-ae50-e0b67ae3b3fc">Reprint note</heading><block><txt break.before="1">This is the last reprint before expiry. Expired on 31 August 2017. See SIA s 56A(2) and SIR s 3 sch 2 pt 2.</txt></block></statusrecord></coverdata><wrapper><front id="frnt" guid="_5e6f4070-f9e8-424a-ad1e-13ba5046d2c4"><shorttitle id="frnt-st" guid="_25a92835-ca31-4504-9e07-c0554cb512e5">Coastal Protection and Management Regulation 2003</shorttitle></front><body numbering.style="manual"><part id="pt.1" guid="_d9c03932-b3de-4668-98a2-0de8f0cd3c31" affected.by.uncommenced="0"><no>Part 1</no><heading id="pt.1-he" guid="_96f602fc-52c6-436b-832f-2cf2c683150d">Preliminary</heading><clause id="sec.1" guid="_a69b5914-3152-4f51-903c-5a45e4dc6ad8" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>1</no><heading id="sec.1-he" guid="_5b48e535-4822-47ca-a403-fcef462801ca">Short title</heading><block><txt break.before="1">This regulation may be cited as the <legref jurisd="QLD" type="act" target.doc.id="sl-2003-0203" target.version.series="bffd5976-0c46-427a-974b-50342a51f2b2" check="valid"><name emphasis="yes">Coastal Protection and Management Regulation 2003</name></legref>.</txt></block></clause><clause id="sec.2" guid="_4ee3893d-f89a-4d37-b1dd-5372c2704de0" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>2</no><heading id="sec.2-he" guid="_3a3d21d4-5e7e-4eab-a5ec-e7b4d7925c9e">Commencement</heading><block><txt break.before="1">This regulation commences on 20 October 2003.</txt></block></clause><clause id="sec.3" guid="_9d881bf7-7305-46dd-ae7c-c7a2ffac43d0" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>3</no><heading id="sec.3-he" guid="_4f9be819-00d9-4415-834d-3e2c42c71701">Definitions</heading><block><txt break.before="1">The dictionary in <intref refid="sch.5" target.guid="_49e0b07a-3778-44d4-9b4c-41fa616a0ea8" check="valid">schedule&#160;5</intref> defines particular words used in this regulation.</txt></block></clause></part><part id="pt.2" guid="_32e6fcd1-e564-4cd2-aa2d-8ad27c9a9373" affected.by.uncommenced="0"><no>Part 2</no><heading id="pt.2-he" guid="_ed02fe95-89f8-48da-b5ec-a44898bd1589">Coastal zone map and coastal management districts</heading><historynote><txt break.before="1"><b>pt hdg</b> sub <legref jurisd="QLD" type="act" target.doc.id="sl-2012-0002" target.version.series="68c6c420-af81-4fd0-8f17-4d05b858ec5e" valid.date="as.made" check="valid">2012 SL&#160;No.&#160;2</legref><legref jurisd="QLD" type="act" refid="sec.4" target.doc.id="sl-2012-0002" valid.date="as.made" check="invalid">s&#160;4</legref></txt></historynote><clause id="sec.4" guid="_a4d0bf23-439b-41dd-8ed8-9ff1ed034ba5" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>4</no><heading id="sec.4-he" guid="_6dc07e3c-05b3-41f7-a2ac-c9a91dd0b896">Approval of coastal zone map—Act, s 18C</heading><subclause id="sec.4-ssec.1" guid="_8ce0eee2-30c0-4d78-af02-29c47d05ee59" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The map called ‘Coastal zone map for Queensland’, certified by the chief executive on 3 October 2011, is approved as the coastal zone map.</txt></block></subclause><subclause id="sec.4-ssec.2" guid="_10d8e751-f141-4eec-b205-ee1b40126d12" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The exact location of the boundary of the coastal zone shown on the map is held in digital electronic form by the department.</txt></block></subclause><historynote><txt break.before="1"><b><intref refid="sec.4" target.guid="_a4d0bf23-439b-41dd-8ed8-9ff1ed034ba5" check="valid">s&#160;4</intref></b> amd <legref jurisd="QLD" type="act" target.doc.id="sl-2003-0260" target.version.series="20eb0f15-b773-4e81-b4c5-c8d88dc75ff0" valid.date="as.made" check="valid">2003 SL&#160;No.&#160;260</legref><legref jurisd="QLD" type="act" refid="sec.5" target.doc.id="sl-2003-0260" valid.date="as.made" check="invalid"> s&#160;5</legref>; <legref jurisd="QLD" type="act" target.doc.id="sl-2004-0316" target.version.series="76e98146-1d4d-48ff-b331-4fe014f2fc00" valid.date="as.made" check="valid">2004 SL&#160;No.&#160;316 </legref><legref jurisd="QLD" type="act" refid="sec.4" target.doc.id="sl-2004-0316" valid.date="as.made" check="invalid">s&#160;4</legref></txt></historynote><historynote><txt break.before="1">sub <legref jurisd="QLD" type="act" target.doc.id="sl-2012-0002" target.version.series="68c6c420-af81-4fd0-8f17-4d05b858ec5e" valid.date="as.made" check="valid">2012 SL&#160;No.&#160;2 </legref><legref jurisd="QLD" type="act" refid="sec.4" target.doc.id="sl-2012-0002" valid.date="as.made" check="invalid">s&#160;4</legref></txt></historynote></clause><clause id="sec.4A" guid="_5a5d7a1f-7811-4900-ab79-d48843b7ce45" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>4A</no><heading id="sec.4A-he" guid="_c519aa4c-5bbc-43d4-b821-6bdd28737080">Declaration of coastal management district—Act, s 54</heading><subclause id="sec.4A-ssec.1" guid="_56e4703e-b5b8-4d24-8572-cf0ca699c29f" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The area shown as a coastal management district on the map called ‘Coastal Management District For Queensland’, dated 17 November 2015, is declared to be a coastal management district.</txt></block></subclause><subclause id="sec.4A-ssec.2" guid="_95519bf6-df98-4a94-9123-48646374e46a" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The exact location of the boundary of the coastal management district mentioned in <intref refid="sec.4A-ssec.1" target.guid="_56e4703e-b5b8-4d24-8572-cf0ca699c29f" check="valid">subsection&#160;(1)</intref> is held in digital electronic form by the department.</txt></block></subclause><historynote><txt break.before="1"><b><intref refid="sec.4A" target.guid="_5a5d7a1f-7811-4900-ab79-d48843b7ce45" check="valid">s 4A</intref></b> ins <legref jurisd="QLD" type="act" target.doc.id="sl-2012-0002" target.version.series="68c6c420-af81-4fd0-8f17-4d05b858ec5e" valid.date="as.made" check="valid">2012 SL No. 2 </legref><legref jurisd="QLD" type="act" refid="sec.4" target.doc.id="sl-2012-0002" valid.date="as.made" check="invalid">s 4</legref></txt></historynote><historynote><txt break.before="1">amd <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0329" target.version.series="cde8cdd8-8d60-4527-a392-50060ad17061" valid.date="as.made" check="valid">2014 SL No. 329</legref><legref jurisd="QLD" type="act" refid="sec.3" target.doc.id="sl-2014-0329" valid.date="as.made" check="invalid"> s 3</legref>; 2015 SL No. 180 s 4</txt></historynote></clause><clause id="sec.4B" guid="_d4cc7b22-5a7a-47b4-98f9-cd170585ce2d" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>4B</no><heading id="sec.4B-he" guid="_64101e18-767f-4a84-8295-3742b2a172b8">Fixing coastal building lines—Act, s 66</heading><subclause id="sec.4B-ssec.1" guid="_255caed2-f13d-4982-b4af-a8feb3fe8fa2" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">Each line shown on the map mentioned in <intref refid="sec.4A" target.guid="_5a5d7a1f-7811-4900-ab79-d48843b7ce45" check="valid">section&#160;4A</intref><intref refid="sec.4A-ssec.1" target.guid="_56e4703e-b5b8-4d24-8572-cf0ca699c29f" check="valid">(1)</intref> as a coastal building line for the coastal management district shown on the map is a coastal building line for the district.</txt></block></subclause><subclause id="sec.4B-ssec.2" guid="_1ffecba1-82ef-4a14-b07a-6276e5d892f0" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The exact location of each coastal building line is held in digital electronic form by the department.</txt></block></subclause><historynote><txt break.before="1"><b><intref refid="sec.4B" target.guid="_d4cc7b22-5a7a-47b4-98f9-cd170585ce2d" check="valid">s&#160;4B</intref></b> ins <legref jurisd="QLD" type="act" target.doc.id="sl-2012-0002" target.version.series="68c6c420-af81-4fd0-8f17-4d05b858ec5e" valid.date="as.made" check="valid">2012 SL&#160;No.&#160;2</legref><legref jurisd="QLD" type="act" refid="sec.4" target.doc.id="sl-2012-0002" valid.date="as.made" check="invalid">s&#160;4</legref></txt></historynote><historynote><txt break.before="1">amd <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0329" target.version.series="cde8cdd8-8d60-4527-a392-50060ad17061" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;329</legref><legref jurisd="QLD" type="act" refid="sec.4" target.doc.id="sl-2014-0329" valid.date="as.made" check="invalid">s&#160;4</legref></txt></historynote></clause><clause id="sec.4C" guid="_d47f5823-1014-4393-9dd0-96dacce02999" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>4C</no><heading id="sec.4C-he" guid="_287c8076-7afc-47e3-8e53-23d039d5de6f">Access to maps and information held in digital electronic form</heading><subclause id="sec.4C-ssec.1" guid="_3c95738a-c861-490b-9ebd-2a7e40cd8d23" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">Each map, and the exact location of each boundary or coastal building line held in digital electronic form, mentioned in <intref refid="sec.4" target.guid="_a4d0bf23-439b-41dd-8ed8-9ff1ed034ba5" check="valid">sections&#160;4</intref> to <intref refid="sec.4B" target.guid="_d4cc7b22-5a7a-47b4-98f9-cd170585ce2d" check="valid">4B</intref> can be accessed, free of charge, on the department’s website.</txt></block></subclause><subclause id="sec.4C-ssec.2" guid="_8123767a-a187-4a19-a1b1-e11e5e2edbe4" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The information held in digital electronic form can be reduced or enlarged to show the details of the boundary or coastal building line.</txt></block></subclause><historynote><txt break.before="1"><b><intref refid="sec.4C" target.guid="_d47f5823-1014-4393-9dd0-96dacce02999" check="valid">s&#160;4C</intref></b> ins <legref jurisd="QLD" type="act" target.doc.id="sl-2012-0002" target.version.series="68c6c420-af81-4fd0-8f17-4d05b858ec5e" valid.date="as.made" check="valid">2012 SL&#160;No.&#160;2</legref><legref jurisd="QLD" type="act" refid="sec.4" target.doc.id="sl-2012-0002" valid.date="as.made" check="invalid">s&#160;4</legref></txt></historynote></clause><clause id="sec.5" guid="_48738cd6-ffc1-4301-ac43-0a35e26bf218" status="repealed" affected.by.uncommenced="0" spent.amends="0" provision.type="other" toc="no"><no>5</no><heading id="sec.5-he" guid="_9e46ea8e-8401-45d2-9935-4e7c55f656c9">Fees for assessment of development application</heading><repealed><repealedtxt/></repealed><historynote><txt break.before="1"><b><intref refid="sec.5" target.guid="_48738cd6-ffc1-4301-ac43-0a35e26bf218" check="valid">s&#160;5</intref></b> amd <legref jurisd="QLD" type="act" target.doc.id="sl-2004-0316" target.version.series="76e98146-1d4d-48ff-b331-4fe014f2fc00" valid.date="as.made" check="valid">2004 SL&#160;No.&#160;316</legref><legref jurisd="QLD" type="act" refid="sec.5" target.doc.id="sl-2004-0316" valid.date="as.made" check="invalid">s&#160;5</legref></txt></historynote><historynote><txt break.before="1">om <legref jurisd="QLD" type="act" target.doc.id="sl-2013-0204" target.version.series="66379cf4-9460-4c09-a4a4-e0cdf9643291" valid.date="as.made" check="valid">2013 SL&#160;No.&#160;204</legref><legref jurisd="QLD" type="act" refid="sec.3" target.doc.id="sl-2013-0204" valid.date="as.made" check="invalid">s&#160;3</legref></txt></historynote></clause></part><part id="pt.3" guid="_097f002e-c365-49cf-a2d0-ffd38973afaa" affected.by.uncommenced="0"><no>Part 3</no><heading id="pt.3-he" guid="_2f056790-7f4c-42f6-9c32-e2a1d6569485">Fees and royalties</heading><division id="pt.3-div.1" guid="_e8cb49f2-ab6b-4178-9051-cc97f6c17bdd" affected.by.uncommenced="0"><no>Division 1</no><heading id="pt.3-div.1-he" guid="_222794a1-fe41-4cb5-8c3d-87920e7c1a7d">Fees</heading><clause id="sec.6" guid="_aad1487c-b4f3-4870-a69c-736f2c65fcd0" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>6</no><heading id="sec.6-he" guid="_3d646bf1-8087-4757-b646-420fa2ac179b">Fees for allocations and dredge management plans</heading><block><txt break.before="1">The fees payable under the <legref jurisd="QLD" type="act" target.doc.id="UNKNOWN" check="invalid">Act</legref> in relation to an allocation or a dredge management plan are stated in schedule&#160;3.</txt></block></clause></division><division id="pt.3-div.2" guid="_b0835437-5213-4619-9ff9-fa864a451525" affected.by.uncommenced="0"><no>Division 2</no><heading id="pt.3-div.2-he" guid="_f9242398-3db5-48eb-93a9-1b1080d0fa89">Royalties</heading><historynote><txt break.before="1"><b>pt 3 div 2 sdiv 1 hdg</b> om <legref jurisd="QLD" type="act" target.doc.id="sl-2004-0316" target.version.series="76e98146-1d4d-48ff-b331-4fe014f2fc00" valid.date="as.made" check="valid">2004 SL&#160;No.&#160;316</legref><legref jurisd="QLD" type="act" refid="sec.6" target.doc.id="sl-2004-0316" valid.date="as.made" check="invalid"> s&#160;6</legref></txt></historynote><historynote><txt break.before="1"><b>pt 3 div 2 sdiv 2 hdg</b> om <legref jurisd="QLD" type="act" target.doc.id="sl-2004-0316" target.version.series="76e98146-1d4d-48ff-b331-4fe014f2fc00" valid.date="as.made" check="valid">2004 SL&#160;No.&#160;316</legref><legref jurisd="QLD" type="act" refid="sec.6" target.doc.id="sl-2004-0316" valid.date="as.made" check="invalid"> s&#160;6</legref></txt></historynote><historynote><txt break.before="1"><b>pt 3 div 2 sdiv 3 hdg</b> om <legref jurisd="QLD" type="act" target.doc.id="sl-2004-0316" target.version.series="76e98146-1d4d-48ff-b331-4fe014f2fc00" valid.date="as.made" check="valid">2004 SL&#160;No.&#160;316</legref><legref jurisd="QLD" type="act" refid="sec.6" target.doc.id="sl-2004-0316" valid.date="as.made" check="invalid"> s&#160;6</legref></txt></historynote><clause id="sec.7" guid="_1520bde4-da02-41a3-98f9-04c9a499f96f" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>7</no><heading id="sec.7-he" guid="_adff398e-39a6-408d-8be8-309f11c4c82f">Rate of royalty—Act, s 102</heading><block><txt break.before="1">For <legref jurisd="QLD" type="act" refid="sec.102" target.doc.id="UNKNOWN" check="invalid">section 102</legref><legref jurisd="QLD" type="act" refid="sec.102-ssec.1" target.doc.id="UNKNOWN" check="invalid">(1)</legref> of the <legref jurisd="QLD" type="act" target.doc.id="UNKNOWN" check="invalid">Act</legref>, the rate at which royalty is payable is stated in schedule 4.</txt></block><historynote><txt break.before="1"><b><intref refid="sec.7" target.guid="_1520bde4-da02-41a3-98f9-04c9a499f96f" check="valid">s&#160;7</intref></b> amd <legref jurisd="QLD" type="act" target.doc.id="sl-2004-0316" target.version.series="76e98146-1d4d-48ff-b331-4fe014f2fc00" valid.date="as.made" check="valid">2004 SL&#160;No.&#160;316</legref><legref jurisd="QLD" type="act" refid="sec.7" target.doc.id="sl-2004-0316" valid.date="as.made" check="invalid"> s&#160;7</legref></txt></historynote></clause><clause id="sec.8" guid="_0ff4e5bf-46f2-4d46-9bed-e1b5377eefe3" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>8</no><heading id="sec.8-he" guid="_dd13f974-634d-401d-b235-e0f0c0e4712a">When royalty payable—Act, s 102</heading><block><txt break.before="1">For <legref jurisd="QLD" type="act" refid="sec.102" target.doc.id="UNKNOWN" check="invalid">section 102</legref><legref jurisd="QLD" type="act" refid="sec.102-ssec.1" target.doc.id="UNKNOWN" check="invalid">(1)</legref> of the <legref jurisd="QLD" type="act" target.doc.id="UNKNOWN" check="invalid">Act</legref>, royalty is payable for quarry material removed under an allocation notice when a notice mentioned in <legref jurisd="QLD" type="act" refid="sec.80" target.doc.id="UNKNOWN" check="invalid">section 80</legref><legref jurisd="QLD" type="act" refid="sec.80-ssec.2" target.doc.id="UNKNOWN" check="invalid">(2)</legref> of the <legref jurisd="QLD" type="act" target.doc.id="UNKNOWN" check="invalid">Act</legref> is given to the chief executive for the removal.</txt></block><historynote><txt break.before="1"><b><intref refid="sec.8" target.guid="_0ff4e5bf-46f2-4d46-9bed-e1b5377eefe3" check="valid">s&#160;8</intref></b> amd <legref jurisd="QLD" type="act" target.doc.id="sl-2004-0316" target.version.series="76e98146-1d4d-48ff-b331-4fe014f2fc00" valid.date="as.made" check="valid">2004 SL&#160;No.&#160;316 </legref><legref jurisd="QLD" type="act" refid="sec.7" target.doc.id="sl-2004-0316" valid.date="as.made" check="invalid">ss&#160;7</legref>–<legref jurisd="QLD" type="act" refid="sec.8" target.doc.id="sl-2004-0316" valid.date="as.made" check="invalid">8</legref></txt></historynote><historynote><txt break.before="1">sub <legref jurisd="QLD" type="act" target.doc.id="sl-2012-0002" target.version.series="68c6c420-af81-4fd0-8f17-4d05b858ec5e" valid.date="as.made" check="valid">2012 SL&#160;No.&#160;2 </legref><legref jurisd="QLD" type="act" refid="sec.5" target.doc.id="sl-2012-0002" valid.date="as.made" check="invalid">s&#160;5</legref></txt></historynote></clause><clause id="sec.9" guid="_29be6c00-c857-4c80-b0c2-8754f4c07f89" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>9</no><heading id="sec.9-he" guid="_fc5e3d26-e28a-4d64-9a92-076706c85acf">Royalty not payable for particular transport-related matters</heading><subclause id="sec.9-ssec.1" guid="_c20fe517-3a08-4b46-8199-e7a0a2d6eaea" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">No royalty is payable for quarry material removed by any of the following persons if the conditions stated in <intref refid="sec.9-ssec.2" target.guid="_7f9b0eb5-ebea-46c6-b1e9-c934499f2dd3" check="valid">subsection (2)</intref> are satisfied in relation to the removal—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.9-ssec.1-para1.a" guid="_3f46212e-71ee-479c-9d74-4285d4921a19" provision.type="other"><no>(a)</no><block><txt break.before="0">the chief executive of the department in which the <legref jurisd="QLD" type="act" target.doc.id="act-1994-008" target.version.series="060a2469-1586-4719-b2aa-d22cc9ff8daf" check="valid"><name emphasis="yes">Transport Infrastructure Act 1994</name></legref>, to the extent it relates to transport infrastructure other than roads, is administered;</txt></block></li><li id="sec.9-ssec.1-para1.b" guid="_17a63396-15f3-4d9d-878b-3de3f9d9b874" provision.type="other"><no>(b)</no><block><txt break.before="0">a person who manages a public marine facility;</txt></block></li><li id="sec.9-ssec.1-para1.c" guid="_b74281aa-c9dd-478a-82cf-a8777f275d68" provision.type="other"><no>(c)</no><block><txt break.before="0">a person who is removing the quarry material for a person mentioned in paragraph (a) or (b).</txt></block></li></list></block></subclause><subclause id="sec.9-ssec.2" guid="_7f9b0eb5-ebea-46c6-b1e9-c934499f2dd3" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref refid="sec.9-ssec.1" target.guid="_c20fe517-3a08-4b46-8199-e7a0a2d6eaea" check="valid">subsection&#160;(1)</intref>, the conditions are—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.9-ssec.2-para1.a" guid="_cd70041c-6985-418b-aec4-2c048be299bb" provision.type="other"><no>(a)</no><block><txt break.before="0">the person removes the material to develop, maintain or improve navigational channels; and</txt></block></li><li id="sec.9-ssec.2-para1.b" guid="_0f9e1338-33e7-4602-9029-3f3f5a48f701" provision.type="other"><no>(b)</no><block><txt break.before="0">the person disposes of the material on land; and</txt></block></li><li id="sec.9-ssec.2-para1.c" guid="_860988d3-13d9-42de-9d05-3d922c0f964c" provision.type="other"><no>(c)</no><block><txt break.before="0">the material is to be used for—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.9-ssec.2-para1.c-para2.i" guid="_4adacffb-cfea-4af7-90e9-25425016fb3d" provision.type="other"><no>(i)</no><block><txt break.before="0">beach nourishment, filling or reclamation purposes; or</txt></block></li><li id="sec.9-ssec.2-para1.c-para2.ii" guid="_0b2155b5-9e74-4e5f-83c0-66dc1502713a" provision.type="other"><no>(ii)</no><block><txt break.before="0">another purpose that does not involve the sale of any of the material.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.9-ssec.3" guid="_419e46ff-0f39-4629-a994-30fe9091ad93" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">No royalty is payable by a port authority, port lessor, port lessee or port manager for quarry material removed—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.9-ssec.3-para1.a" guid="_2ff72d83-de9d-44e6-8939-1dbbe85b9bff" provision.type="other"><no>(a)</no><block><txt break.before="0">to maintain or improve navigational channels or navigation in its port if the material is disposed of—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.9-ssec.3-para1.a-para2.i" guid="_6ba13a2b-f9d1-4713-8b34-c1a1665e3708" provision.type="other"><no>(i)</no><block><txt break.before="0">in an area associated with port activities and approved by the Minister of the department in which the <legref jurisd="QLD" type="act" target.doc.id="act-1994-008" target.version.series="060a2469-1586-4719-b2aa-d22cc9ff8daf" check="valid"><name emphasis="yes">Transport Infrastructure Act 1994</name></legref> is administered; and</txt></block></li><li id="sec.9-ssec.3-para1.a-para2.ii" guid="_85fad14a-0d8b-4902-a60a-fe31744b4605" provision.type="other"><no>(ii)</no><block><txt break.before="0">under relevant statutory environmental controls; or</txt></block></li></list></block></li><li id="sec.9-ssec.3-para1.b" guid="_e7413e64-3219-4f9d-bc0a-63e202768660" provision.type="other"><no>(b)</no><block><txt break.before="0">to reclaim land that is, or is proposed to be, strategic port land or Brisbane core port land under the <legref jurisd="QLD" type="act" target.doc.id="act-1994-008" target.version.series="060a2469-1586-4719-b2aa-d22cc9ff8daf" check="valid"><name emphasis="yes">Transport Infrastructure Act 1994</name></legref>.</txt></block></li></list></block></subclause><historynote><txt break.before="1"><b><intref refid="sec.9" target.guid="_29be6c00-c857-4c80-b0c2-8754f4c07f89" check="valid">s&#160;9</intref></b> amd <legref jurisd="QLD" type="act" target.doc.id="sl-2004-0316" target.version.series="76e98146-1d4d-48ff-b331-4fe014f2fc00" valid.date="as.made" check="valid">2004 SL&#160;No.&#160;316 </legref><legref jurisd="QLD" type="act" refid="sec.9" target.doc.id="sl-2004-0316" valid.date="as.made" check="invalid">s&#160;9</legref>; <legref jurisd="QLD" type="act" target.doc.id="act-2010-019" target.version.series="597a24fa-6815-40a5-b9df-d085a14a6f38" valid.date="as.made" check="valid">2010 Act&#160;No.&#160;19</legref><legref jurisd="QLD" type="act" refid="sec.19" target.doc.id="act-2010-019" valid.date="as.made" check="invalid"> s&#160;19</legref></txt></historynote></clause><clause id="sec.10" guid="_5b14093b-bb6e-4f70-8f5f-5e0c604232e2" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>10</no><heading id="sec.10-he" guid="_630fadae-6a6c-418b-a667-b1a1d4f70d4d">Royalty not payable for removal of quarry material for particular purposes</heading><block><txt break.before="1">No royalty is payable by a person for quarry material removed under an allocation notice if, at the time a royalty for the material would have been payable under <intref refid="sec.8" target.guid="_0ff4e5bf-46f2-4d46-9bed-e1b5377eefe3" check="valid">section&#160;8</intref>, the material—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.10-para1.a" guid="_08ff31ec-cdd9-4f20-a43e-3547b6cb78df" provision.type="other"><no>(a)</no><block><txt break.before="0">has been, or is being, used for beach nourishment for which the person has a development approval; or</txt></block></li><li id="sec.10-para1.b" guid="_17907782-ef99-471d-9af1-2e61ff46e2f0" provision.type="other"><no>(b)</no><block><txt break.before="0">is mostly mud, silt, or clay that has been, or is being, disposed of on land for filling or reclamation purposes; or</txt></block></li><li id="sec.10-para1.c" guid="_9b74762a-808c-4601-ae93-b4f0946fac48" provision.type="other"><no>(c)</no><block><txt break.before="0">has been, or is being, placed on land to avoid an adverse effect, or a potential adverse effect, on the environment.</txt></block></li></list></block><historynote><txt break.before="1"><b><intref refid="sec.10" target.guid="_5b14093b-bb6e-4f70-8f5f-5e0c604232e2" check="valid">s&#160;10</intref></b> sub <legref jurisd="QLD" type="act" target.doc.id="sl-2012-0002" target.version.series="68c6c420-af81-4fd0-8f17-4d05b858ec5e" valid.date="as.made" check="valid">2012 SL&#160;No.&#160;2</legref><legref jurisd="QLD" type="act" refid="sec.6" target.doc.id="sl-2012-0002" valid.date="as.made" check="invalid">s&#160;6</legref></txt></historynote></clause><clause id="sec.11" guid="_c3177b76-38cd-46eb-a781-f3978698a024" status="repealed" affected.by.uncommenced="0" spent.amends="0" provision.type="other" toc="no"><no>11</no><heading id="sec.11-he" guid="_721391f1-69d7-4b06-99cc-107c956a10b0">When waiver application may be made</heading><repealed><repealedtxt/></repealed><historynote><txt break.before="1"><b><intref refid="sec.11" target.guid="_c3177b76-38cd-46eb-a781-f3978698a024" check="valid">s&#160;11</intref></b> amd <legref jurisd="QLD" type="act" target.doc.id="sl-2004-0316" target.version.series="76e98146-1d4d-48ff-b331-4fe014f2fc00" valid.date="as.made" check="valid">2004 SL&#160;No.&#160;316</legref><legref jurisd="QLD" type="act" refid="sec.8" target.doc.id="sl-2004-0316" valid.date="as.made" check="invalid"> s&#160;8</legref></txt></historynote><historynote><txt break.before="1">om <legref jurisd="QLD" type="act" target.doc.id="sl-2012-0002" target.version.series="68c6c420-af81-4fd0-8f17-4d05b858ec5e" valid.date="as.made" check="valid">2012 SL&#160;No.&#160;2</legref><legref jurisd="QLD" type="act" refid="sec.6" target.doc.id="sl-2012-0002" valid.date="as.made" check="invalid"> s&#160;6</legref></txt></historynote></clause><clause id="sec.12" guid="_8a7b1dae-26ca-4523-b4d6-ae3a0cb37a30" status="repealed" affected.by.uncommenced="0" spent.amends="0" provision.type="other" toc="no"><no>12</no><heading id="sec.12-he" guid="_bf44b1dc-4fc2-479d-8c6d-622624bc4e31">When royalty must be waived</heading><repealed><repealedtxt/></repealed><historynote><txt break.before="1"><b><intref refid="sec.12" target.guid="_8a7b1dae-26ca-4523-b4d6-ae3a0cb37a30" check="valid">s&#160;12</intref></b> om <legref jurisd="QLD" type="act" target.doc.id="sl-2012-0002" target.version.series="68c6c420-af81-4fd0-8f17-4d05b858ec5e" valid.date="as.made" check="valid">2012 SL&#160;No.&#160;2 </legref><legref jurisd="QLD" type="act" refid="sec.6" target.doc.id="sl-2012-0002" valid.date="as.made" check="invalid">s&#160;6</legref></txt></historynote></clause><clause id="sec.13" guid="_07719bf3-5810-4c19-b081-3066291fd009" status="repealed" affected.by.uncommenced="0" spent.amends="0" provision.type="other" toc="no"><no>13</no><heading id="sec.13-he" guid="_5d595fd5-a45c-4d05-86bf-8e085ce3483a">Refund of royalty waived</heading><repealed><repealedtxt/></repealed><historynote><txt break.before="1"><b><intref refid="sec.13" target.guid="_07719bf3-5810-4c19-b081-3066291fd009" check="valid">s&#160;13</intref></b> om <legref jurisd="QLD" type="act" target.doc.id="sl-2012-0002" target.version.series="68c6c420-af81-4fd0-8f17-4d05b858ec5e" valid.date="as.made" check="valid">2012 SL&#160;No.&#160;2</legref><legref jurisd="QLD" type="act" refid="sec.6" target.doc.id="sl-2012-0002" valid.date="as.made" check="invalid"> s&#160;6</legref></txt></historynote></clause></division></part><part id="pt.4" guid="_a0f938ab-e786-4ca4-a4fe-22b8304d6be0" affected.by.uncommenced="0"><no>Part 4</no><heading id="pt.4-he" guid="_3ee32aaf-3236-4b1e-aa5a-5f2f34c4bcfb">Tidal works</heading><historynote><txt break.before="1"><b>pt hdg</b> ins <legref jurisd="QLD" type="act" target.doc.id="sl-2005-0275" target.version.series="b034c269-9d45-4dea-abc9-286d7bdf87c8" valid.date="as.made" check="valid">2005 SL&#160;No.&#160;275 </legref><legref jurisd="QLD" type="act" refid="sec.3" target.doc.id="sl-2005-0275" valid.date="as.made" check="invalid">s&#160;3</legref></txt></historynote><historynote><txt break.before="1">amd <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0021" target.version.series="d6d5a3c5-2199-4876-8c60-f6961840b188" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;21 </legref><legref jurisd="QLD" type="act" refid="sec.3" target.doc.id="sl-2014-0021" valid.date="as.made" check="invalid">s&#160;3</legref></txt></historynote><historynote><txt break.before="1">sub 2017 SL No. 103 s 27</txt></historynote><historynote><txt break.before="1"><b>pt 4 div 1 hdg</b> ins <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0021" target.version.series="d6d5a3c5-2199-4876-8c60-f6961840b188" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;21</legref><legref jurisd="QLD" type="act" refid="sec.4" target.doc.id="sl-2014-0021" valid.date="as.made" check="invalid"> s&#160;4</legref></txt></historynote><historynote><txt break.before="1">om 2017 SL No. 103 s 27</txt></historynote><historynote><txt break.before="1"><b>pt 4 div 2 hdg</b> ins <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0021" target.version.series="d6d5a3c5-2199-4876-8c60-f6961840b188" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;21</legref><legref jurisd="QLD" type="act" refid="sec.5" target.doc.id="sl-2014-0021" valid.date="as.made" check="invalid"> s&#160;5</legref></txt></historynote><historynote><txt break.before="1">om 2017 SL No. 103 s 27</txt></historynote><clause id="sec.14" guid="_8b60e182-1316-41bc-ab3f-5a4250768746" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>14</no><heading id="sec.14-he" guid="_9cdd3435-6518-49b0-bc10-d5c9d176fe7b">Assessment benchmarks for particular prescribed tidal works—Act, s 167</heading><subclause id="sec.14-ssec.1" guid="_371b34e1-aa26-419c-ab2a-572657eef527" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to a development application for, or a change application relating to, assessable development that is prescribed tidal works, if the planning chief executive is not the assessment manager or responsible entity for the application.</txt></block></subclause><subclause id="sec.14-ssec.2" guid="_a7f56f08-97e2-44a4-87ba-5be853ad93d5" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">For section 167(5)(a) of the Act, the code in schedule 4A is an assessment benchmark for the Planning Act for the development.</txt></block></subclause><historynote><txt break.before="1"><b>s&#160;14</b> ins <legref jurisd="QLD" type="act" check="unknown">2005 SL&#160;No.&#160;275 </legref><legref jurisd="QLD" type="act" check="unknown">s&#160;3</legref></txt></historynote><historynote><txt break.before="1">amd <legref jurisd="QLD" type="act" check="unknown">2009 SL&#160;No.&#160;280</legref><legref jurisd="QLD" type="act" check="unknown"> s&#160;62</legref></txt></historynote><historynote><txt break.before="1">sub 2017 SL No. 103 s 27</txt></historynote></clause><clause id="sec.15" guid="_ee8657e2-d977-4f00-85c9-1845ad864e4b" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>15</no><heading id="sec.15-he" guid="_e85606f5-f727-42e6-9e5b-e2bd94b8466a">Requirements for accepted development—Act, s 167</heading><subclause id="sec.15-ssec.1" guid="_05fa422c-bc67-4fbb-8cd0-ef5a9aa6b325" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to operational work mentioned in the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Planning Regulation 2017</name></legref>, schedule 7, section 10(a), if undertaken by an entity mentioned in the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Planning Regulation 2017</name></legref>, schedule 7, section 10(b).</txt></block></subclause><subclause id="sec.15-ssec.2" guid="_f3233a67-5e67-4a39-a565-02629468c675" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">For section 167(5)(b) of the Act, the operational work must comply with the document called ‘Code for self-assessable development—For tidal works, or work completely or partly within a coastal management district’ dated December 2014 and published on the department’s website.</txt></block></subclause><historynote><txt break.before="1"><b>s&#160;15</b> ins <legref jurisd="QLD" type="act" target.doc.id="sl-2005-0275" target.version.series="b034c269-9d45-4dea-abc9-286d7bdf87c8" valid.date="as.made" check="valid">2005 SL&#160;No.&#160;275 </legref><legref jurisd="QLD" type="act" refid="sec.3" target.doc.id="sl-2005-0275" valid.date="as.made" check="invalid">s&#160;3</legref></txt></historynote><historynote><txt break.before="1">amd <legref jurisd="QLD" type="act" target.doc.id="sl-2009-0280" target.version.series="733c849a-1ebf-43d1-8c69-932e3c2fa135" valid.date="as.made" check="valid">2009 SL&#160;No.&#160;280</legref><legref jurisd="QLD" type="act" refid="sec.63" target.doc.id="sl-2009-0280" valid.date="as.made" check="invalid"> s&#160;63</legref>; <legref jurisd="QLD" type="act" target.doc.id="act-2010-019" target.version.series="597a24fa-6815-40a5-b9df-d085a14a6f38" valid.date="as.made" check="valid">2010 Act&#160;No.&#160;19</legref><legref jurisd="QLD" type="act" refid="sec.20" target.doc.id="act-2010-019" valid.date="as.made" check="invalid"> s&#160;20</legref>; <legref jurisd="QLD" type="act" target.doc.id="sl-2012-0002" target.version.series="68c6c420-af81-4fd0-8f17-4d05b858ec5e" valid.date="as.made" check="valid">2012 SL&#160;No.&#160;2</legref><legref jurisd="QLD" type="act" refid="sec.7" target.doc.id="sl-2012-0002" valid.date="as.made" check="invalid"> s&#160;7</legref></txt></historynote><historynote><txt break.before="1">sub 2017 SL No. 103 s 27</txt></historynote></clause><clause id="sec.16" guid="_5fa52116-e47b-4052-94ef-538273c45380" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>16</no><heading id="sec.16-he" guid="_12d7c835-dccd-4ebf-a2cf-d9c81e46e599">Tidal works that are prescribed tidal works—Act, s 167</heading><block><txt break.before="1">For section 167(5)(d) of the Act, subject to section&#160;16A, the following work is prescribed tidal works—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.16-para1.a" guid="_fd77d056-6acc-4607-b4d9-fe90a8652d4b" provision.type="other"><no>(a)</no><block><txt break.before="0">work that consists only of tidal work;</txt></block></li><li id="sec.16-para1.b" guid="_9629eb51-0930-416d-9796-e1f6c1cfaff8" provision.type="other"><no>(b)</no><block><txt break.before="0">work that consists of both—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.16-para1.b-para2.i" guid="_3c3175f4-e483-4719-88e7-eaa336404d9b" provision.type="other"><no>(i)</no><block><txt break.before="0">tidal work; and</txt></block></li><li id="sec.16-para1.b-para2.ii" guid="_e974d824-f124-4d99-9097-4357f923ab71" provision.type="other"><no>(ii)</no><block><txt break.before="0">other work that is not tidal work if the other work is an integral part of the tidal work.</txt></block></li></list></block></li></list></block><historynote><txt break.before="1"><b>s&#160;16</b> ins <legref jurisd="QLD" type="act" check="unknown">2005 SL&#160;No.&#160;275 </legref><legref jurisd="QLD" type="act" check="unknown">s&#160;3</legref></txt></historynote><historynote><txt break.before="1">amd <legref jurisd="QLD" type="act" check="unknown">2009 SL&#160;No.&#160;280 </legref><legref jurisd="QLD" type="act" check="unknown">s&#160;64</legref>; <legref jurisd="QLD" type="act" check="unknown">2014 SL&#160;No.&#160;21</legref><legref jurisd="QLD" type="act" check="unknown"> s&#160;6</legref>; <legref jurisd="QLD" type="act" check="unknown">2014 SL&#160;No.&#160;330</legref><legref jurisd="QLD" type="act" check="unknown"> s&#160;3</legref></txt></historynote><historynote><txt break.before="1">sub 2017 SL No. 103 s 27</txt></historynote></clause><clause id="sec.16A" guid="_6aef05d2-fa04-4853-ba1d-281ee4405adf" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>16A</no><heading id="sec.16A-he" guid="_370d0318-f098-4087-a305-ac3a1a89ebde">Tidal works that is not prescribed tidal works—Act, s 167</heading><subclause id="sec.16A-ssec.1" guid="_3b6e85f3-5543-49e4-b289-bd544543cdc1" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">For section 167(5)(d) of the Act, the following work is not prescribed tidal work—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.16A-ssec.1-para1.a" guid="_1b2872a2-5dc9-4bb1-a140-72add3dde41d" provision.type="other"><no>(a)</no><block><txt break.before="0">tidal work within a State managed boat harbour;</txt></block></li><li id="sec.16A-ssec.1-para1.b" guid="_1708a805-0009-4b3a-99ed-70d10383da5c" provision.type="other"><no>(b)</no><block><txt break.before="0">tidal work for a new or existing structure used for the operation of—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.16A-ssec.1-para1.b-para2.i" guid="_6a615e5f-fd02-4c87-a4da-623465e6c1a4" provision.type="other"><no>(i)</no><block><txt break.before="0">a port authority or port operator; or</txt></block></li><li id="sec.16A-ssec.1-para1.b-para2.ii" guid="_0a94e3a6-c94a-4633-ae5d-59e5fb70e9fe" provision.type="other"><no>(ii)</no><block><txt break.before="0">a public marine facility constructed by or for Queensland Transport, a port authority or a port operator;</txt></block></li></list></block></li><li id="sec.16A-ssec.1-para1.c" guid="_4fe7e86e-2c7b-4f00-b4ba-0df82824104b" provision.type="other"><no>(c)</no><block><txt break.before="0">tidal work for any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.16A-ssec.1-para1.c-para2.i" guid="_7f9357dd-f812-4cbc-97e4-5150136aaa45" provision.type="other"><no>(i)</no><block><txt break.before="0">creating or changing the configuration or characteristics of a navigational channel;</txt></block></li><li id="sec.16A-ssec.1-para1.c-para2.ii" guid="_5468f9e5-369c-45c6-a0fc-5a485373e254" provision.type="other"><no>(ii)</no><block><txt break.before="0">an inlet or outlet for development for aquaculture if the development is carried out on land and is made accepted under the local government’s planning scheme or is development requiring compliance assessment under the Planning Act;</txt></block></li></list></block></li><li id="sec.16A-ssec.1-para1.d" guid="_4a0f666f-1326-4f23-bdc7-f8a55c68f111" provision.type="other"><no>(d)</no><block><txt break.before="0">tidal work the subject of—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.16A-ssec.1-para1.d-para2.i" guid="_b9904d40-ddd2-4811-bc32-06734ec455ab" provision.type="other"><no>(i)</no><block><txt break.before="0">a deemed approval; or</txt></block></li><li id="sec.16A-ssec.1-para1.d-para2.ii" guid="_4dffaee8-83d3-4b23-9d44-72cb4a1e300e" provision.type="other"><no>(ii)</no><block><txt break.before="0">a development approval given under the repealed <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Integrated Planning Act 1997</name></legref> on or before the day this section commenced; or</txt></block></li><li id="sec.16A-ssec.1-para1.d-para2.iii" guid="_fb0dfeab-7d88-485c-ab2f-143cc399d60c" provision.type="other"><no>(iii)</no><block><txt break.before="0">a development application made under the repealed <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Integrated Planning Act 1997</name></legref> but not decided on or before the day this section commenced.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.16A-ssec.2" guid="_4e7992a7-781a-4596-b13a-efb70efe9dd7" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sec.16A-ssec.2-def.aquaculture_" guid="_8bce2fe9-f590-4eff-8bd5-c0a594c6ad56" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.16A-ssec.2-def.aquaculture" guid="_8c3963df-b160-4b12-80c8-14a66fd509fc" type="definition">aquaculture</defterm> see the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Fisheries Act 1994</name></legref>, schedule.</txt></definition><definition id="sec.16A-ssec.2-def.navigationalchannel_" guid="_2108bd2a-0975-4bb5-9701-23296c8d2d30" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.16A-ssec.2-def.navigationalchannel" guid="_a20ae0e3-e4b5-41a4-a504-8bb4847b2ed7" type="definition">navigational channel </defterm>means a channel marked by an aid to navigation built, erected or placed in tidal water under the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Transport Operations (Marine Safety) Act 1994</name></legref>.</txt></definition><definition id="sec.16A-ssec.2-def.QueenslandTransport_" guid="_c01dc8ed-6da7-4d65-92fe-95a7a429fc64" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.16A-ssec.2-def.QueenslandTransport" guid="_56b49c51-697d-4c54-b6b6-8f91375b6289" type="definition">Queensland Transport</defterm> means the department in which the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Transport Operations (Marine Safety) Act 1994</name></legref> is administered.</txt></definition><definition id="sec.16A-ssec.2-def.Statemanagedboatharbour_" guid="_aaef37bb-07f9-49a9-87a0-ee900b28f797" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.16A-ssec.2-def.Statemanagedboatharbour" guid="_6f42c15a-d621-4914-9c93-0656c317d72f" type="definition">State managed boat harbour</defterm> see the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Transport Infrastructure (Public Marine Facilities) Regulation 2011</name></legref>, <legref jurisd="QLD" type="act" check="unknown">schedule&#160;4</legref>.</txt></definition></deflist></block></subclause><historynote><txt break.before="1"><b>s 16A</b> ins 2017 SL No. 103 s 27</txt></historynote></clause></part><part id="pt.5" guid="_7666d895-30ca-4994-b827-8d1cdc3744ce" affected.by.uncommenced="0"><no>Part 5</no><heading id="pt.5-he" guid="_449119e5-c7d9-4e2b-99d9-f21ad740db46">Transitional provisions for Coastal Protection and Management Amendment and Repeal Regulation 2012</heading><historynote><txt break.before="1"><b>pt 5 (ss 17–19)</b> ins <legref jurisd="QLD" type="act" target.doc.id="sl-2012-0002" target.version.series="68c6c420-af81-4fd0-8f17-4d05b858ec5e" valid.date="as.made" check="valid">2012 SL&#160;No.&#160;2 </legref><legref jurisd="QLD" type="act" refid="sec.8" target.doc.id="sl-2012-0002" valid.date="as.made" check="invalid">s&#160;8</legref></txt></historynote><clause id="sec.17" guid="_1e93d614-f3bc-474b-86ca-e9b3a3093667" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>17</no><heading id="sec.17-he" guid="_8245a935-2cc2-494a-83d0-dd17efc8aa0b">Definitions for pt 5</heading><block><txt break.before="1">In this part—</txt><deflist><definition id="sec.17-def.commencement_" guid="_3b7bb36f-684f-410f-9827-6067b7ae3408" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.17-def.commencement" guid="_6846387e-6f7b-4141-8240-efeb8274ebcc" type="definition">commencement</defterm> means the day this section commences.</txt></definition><definition id="sec.17-def.previous_" guid="_0b7d7243-968d-4dc1-96ee-400f5b86f79b" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.17-def.previous" guid="_a589efcc-57ec-45fc-9600-5d492df272ab" type="definition">previous</defterm>, if followed by a provision number, means the provision of that number as in force before the commencement.</txt></definition></deflist></block><historynote><txt break.before="1"><b>pt 5 (ss 17–19)</b> ins <legref jurisd="QLD" type="act" target.doc.id="sl-2012-0002" target.version.series="68c6c420-af81-4fd0-8f17-4d05b858ec5e" valid.date="as.made" check="valid">2012 SL&#160;No.&#160;2 </legref><legref jurisd="QLD" type="act" refid="sec.8" target.doc.id="sl-2012-0002" valid.date="as.made" check="invalid">s&#160;8</legref></txt></historynote></clause><clause id="sec.18" guid="_96901f37-7fb0-48f7-9e7d-6fa3bab98511" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>18</no><heading id="sec.18-he" guid="_c98b488c-c866-45b2-8ebd-149a3ac7240d">Continuation of provisions for waiver of royalties for quarry material removed under allocation notice</heading><subclause id="sec.18-ssec.1" guid="_dd1fbf4c-e325-41db-bcf4-35d8126f6598" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, before the commencement—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.18-ssec.1-para1.a" guid="_7058e380-dc3d-4689-a6d3-d255f243bb41" provision.type="other"><no>(a)</no><block><txt break.before="0">a person paid royalty for quarry material removed under an allocation notice under previous <intref refid="sec.8" target.guid="_0ff4e5bf-46f2-4d46-9bed-e1b5377eefe3" check="valid">section 8</intref>; and</txt></block></li><li id="sec.18-ssec.1-para1.b" guid="_5d60cbc5-b4e5-4484-b9f9-7fa3961325e7" provision.type="other"><no>(b)</no><block><txt break.before="0">either—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.18-ssec.1-para1.b-para2.i" guid="_1b8163ca-9f05-4962-a600-b348cdb70f20" provision.type="other"><no>(i)</no><block><txt break.before="0">the person had applied under previous <intref refid="sec.10" target.guid="_5b14093b-bb6e-4f70-8f5f-5e0c604232e2" check="valid">section&#160;10</intref> for a waiver of royalty in relation to the quarry material but the application had not been decided; or</txt></block></li><li id="sec.18-ssec.1-para1.b-para2.ii" guid="_b4c9b39a-2dcd-4e44-975c-be4d81ba5db7" provision.type="other"><no>(ii)</no><block><txt break.before="0">the person was entitled to apply for a waiver of royalty but had not made an application under previous <intref refid="sec.10" target.guid="_5b14093b-bb6e-4f70-8f5f-5e0c604232e2" check="valid">section 10</intref>.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.18-ssec.2" guid="_92062832-19f4-4587-9568-5d178f96b1a5" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">Previous <intref refid="sec.10" target.guid="_5b14093b-bb6e-4f70-8f5f-5e0c604232e2" check="valid">sections 10</intref> to <intref refid="sec.13" target.guid="_07719bf3-5810-4c19-b081-3066291fd009" check="valid">13</intref> continue to apply in relation to the quarry material as if the <legref jurisd="QLD" type="act" target.doc.id="sl-2003-0203" target.version.series="bffd5976-0c46-427a-974b-50342a51f2b2" check="valid"><name emphasis="yes">Coastal Protection and Management Regulation 2003</name></legref> had not commenced.</txt></block></subclause><historynote><txt break.before="1"><b>pt 5 (ss 17–19)</b> ins <legref jurisd="QLD" type="act" target.doc.id="sl-2012-0002" target.version.series="68c6c420-af81-4fd0-8f17-4d05b858ec5e" valid.date="as.made" check="valid">2012 SL&#160;No.&#160;2 </legref><legref jurisd="QLD" type="act" refid="sec.8" target.doc.id="sl-2012-0002" valid.date="as.made" check="invalid">s&#160;8</legref></txt></historynote></clause><clause id="sec.19" guid="_56258daf-df93-4e52-872e-ca88eb08cc9c" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>19</no><heading id="sec.19-he" guid="_59045708-6032-49f1-bd77-90e71d8596e0">Continuation of provisions for existing dredge management plans</heading><subclause id="sec.19-ssec.1" guid="_40d64ec7-370f-4165-a909-c0c753c4069d" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to a dredge management plan continued under <legref jurisd="QLD" type="act" refid="sec.201" target.doc.id="UNKNOWN" check="invalid">section 201</legref> of the <legref jurisd="QLD" type="act" target.doc.id="UNKNOWN" check="invalid">Act</legref> and in force immediately before the commencement.</txt></block></subclause><subclause id="sec.19-ssec.2" guid="_998ff06e-08f3-4be2-ae1e-2471b54ed162" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">Sections 6 and 9, schedule 3 and previous <intref refid="sec.10" target.guid="_5b14093b-bb6e-4f70-8f5f-5e0c604232e2" check="valid">sections 10</intref> to <intref refid="sec.13" target.guid="_07719bf3-5810-4c19-b081-3066291fd009" check="valid">13</intref> continue to apply in relation to—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.19-ssec.2-para1.a" guid="_2593b3a0-2858-49d4-aa33-30216aaba310" provision.type="other"><no>(a)</no><block><txt break.before="0">the dredge management plan; and</txt></block></li><li id="sec.19-ssec.2-para1.b" guid="_1c0dbd7e-aa74-41f4-a809-9812205dccda" provision.type="other"><no>(b)</no><block><txt break.before="0">quarry material removed under the dredge management plan.</txt></block></li></list></block></subclause><historynote><txt break.before="1"><b>pt 5 (ss 17–19)</b> ins <legref jurisd="QLD" type="act" target.doc.id="sl-2012-0002" target.version.series="68c6c420-af81-4fd0-8f17-4d05b858ec5e" valid.date="as.made" check="valid">2012 SL&#160;No.&#160;2</legref><legref jurisd="QLD" type="act" refid="sec.8" target.doc.id="sl-2012-0002" valid.date="as.made" check="invalid"> s&#160;8</legref></txt></historynote></clause></part></body></wrapper><schedules affected.by.uncommenced="0" numbering.style="manual"><schedule id="sch.3" guid="_0775d4fe-0844-4e49-aac0-c137ebf94cb8" type="schedule" affected.by.uncommenced="0" spent.amends="0" numbering.style="manual" provision.type="other"><no>Schedule 3</no><heading id="sch.3-he" guid="_45f6b91c-08bf-4d7c-bdfe-e4b375d03b59">Fees for allocations </heading><sourceref id="sch.3-ref" guid="_a7d1b2f7-790e-435b-801c-8f9dc94a07c6" affected.by.uncommenced="0">section&#160;6</sourceref><historynote><txt break.before="1"><b>sch 1</b> amd <legref jurisd="QLD" type="act" check="unknown">2003 SL&#160;No.&#160;260</legref> s 6; <legref jurisd="QLD" type="act" check="unknown">2003 SL&#160;No.&#160;269</legref> s 6; <legref jurisd="QLD" type="act" check="unknown">2003 SL&#160;No.&#160;321</legref> s 6; <legref jurisd="QLD" type="act" check="unknown">2004 SL&#160;No.&#160;216</legref> s 10; <legref jurisd="QLD" type="act" check="unknown">2006 SL&#160;No.&#160;221</legref> s 6</txt></historynote><historynote><txt break.before="1">sub <legref jurisd="QLD" type="act" check="unknown">2012 SL&#160;No.&#160;2</legref> s 9</txt></historynote><historynote><txt break.before="1">om <legref jurisd="QLD" type="act" check="unknown">2014 SL&#160;No.&#160;329</legref> s 5</txt></historynote><historynote><txt break.before="1"><b>sch 2</b> sub <legref jurisd="QLD" type="act" check="unknown">2005 SL&#160;No.&#160;152</legref> s 4; <legref jurisd="QLD" type="act" check="unknown">2006 SL&#160;No.&#160;164</legref> s 4; <legref jurisd="QLD" type="act" check="unknown">2007 SL&#160;No.&#160;159</legref> s 4; <legref jurisd="QLD" type="act" check="unknown">2008 SL&#160;No.&#160;207</legref> s 4; <legref jurisd="QLD" type="act" check="unknown">2009 SL&#160;No.&#160;98</legref> s 4; <legref jurisd="QLD" type="act" check="unknown">2010 SL&#160;No.&#160;162</legref> s 8; <legref jurisd="QLD" type="act" check="unknown">2011 SL&#160;No.&#160;135</legref> s 8; <legref jurisd="QLD" type="act" check="unknown">2012 SL&#160;No.&#160;114</legref> s 4</txt></historynote><historynote><txt break.before="1">om <legref jurisd="QLD" type="act" check="unknown">2013 SL&#160;No.&#160;204</legref> s 4</txt></historynote><block><table frame="none" colsep="0" rowsep="0" orient="port" id="sch.3-tbl" guid="_67459c4b-b3ec-4bd7-b207-99a7ee73499e" heading.align="left" font.size="12.pt"><tgroup cols="3" colsep="0" rowsep="0" tgroupstyle="3columnUnRuled"><colspec colnum="1" colname="1" colwidth="0.331in" colsep="0"/><colspec colnum="2" colname="2" colwidth="3.510in" colsep="0"/><colspec colnum="3" colname="3" colwidth="1.159in" colsep="0"/><thead><row rowsep="0" id="sch.3-tbl-tblh-tblr" guid="_c9b59212-1e6b-4263-976b-3bd3bc4f578f"><entry colname="1" align="left" valign="top" id="sch.3-tbl-tblh-tblr-tble1" guid="_6a180ac5-9027-4496-81fe-dd6f008492b8"><block><txt break.before="1"/></block></entry><entry colname="2" align="left" valign="top" id="sch.3-tbl-tblh-tblr-tble2" guid="_df22b32a-a9f8-4115-9fda-90e5a4e02038"><block><txt break.before="1"/></block></entry><entry colname="3" align="right" valign="top" id="sch.3-tbl-tblh-tblr-tble3" guid="_a28a9125-cc63-4fa1-9ff4-3bb09fecfe77"><block><txt break.before="1">$</txt></block></entry></row></thead><tbody><row rowsep="0" id="sch.3-tbl-tblr" guid="_e058e675-abc3-4cd3-804a-1c13bd87ea41"><entry colname="1" align="left" valign="top" id="sch.3-tbl-tblr-tble1" guid="_305e5148-1470-4ad9-a63e-d389595fca30"><block><txt break.before="1">1</txt></block></entry><entry colname="2" align="justify" valign="top" id="sch.3-tbl-tblr-tble2" guid="_17b257b5-924a-4cf2-b3da-66c58d10eedc"><block><txt break.before="1">Application for an allocation (Act, s 73(2)(b)), allowing the removal of—</txt></block></entry><entry colname="3" align="left" valign="top" id="sch.3-tbl-tblr-tble3" guid="_a8da242e-3d52-4b7b-92a6-b39ef07b9708"><block><txt break.before="1"/></block></entry></row><row rowsep="0" id="sch.3-tbl-tblr-oc.2" guid="_8ff9dac8-d17f-4a2e-86c3-1ab7253463b3"><entry colname="1" align="left" valign="top" id="sch.3-tbl-tblr-oc.2-tble1" guid="_c571308e-afa8-4c95-9441-d0ca7c64ce1c"><block><txt break.before="1"/></block></entry><entry colname="2" align="justify" valign="top" id="sch.3-tbl-tblr-oc.2-tble2" guid="_871ef5e5-56e3-4db8-9bed-9d1dd62ac551"><block><tlist number.type="default"><tli id="sch.3-tbl-tblr-oc.2-tble2-para1.a" guid="_584d2a4d-68fb-4c5f-801e-e5a7dbc26de6"><no>(a)</no><block><txt break.before="1">not more than 10,000m<sup>3</sup> of quarry material</txt></block></tli></tlist></block></entry><entry colname="3" align="right" valign="top" id="sch.3-tbl-tblr-oc.2-tble3" guid="_823e1867-3c04-43aa-96da-d9cf2b184663"><block><txt break.before="1">245.80</txt></block></entry></row><row rowsep="0" id="sch.3-tbl-tblr-oc.3" guid="_0841484e-7178-45b5-b5d1-696cf59ac4e4"><entry colname="1" align="left" valign="top" id="sch.3-tbl-tblr-oc.3-tble1" guid="_4a5132a5-6a2d-44b8-8dcd-f4d09500d000"><block><txt break.before="1"/></block></entry><entry colname="2" align="left" valign="top" id="sch.3-tbl-tblr-oc.3-tble2" guid="_cbf448d2-a1ca-478d-8fc0-11208f4804d8"><block><tlist number.type="default"><tli id="sch.3-tbl-tblr-oc.3-tble2-para1.b" guid="_bf300c65-15d1-4106-a90a-34d187c85159"><no>(b)</no><block><txt break.before="1">more than 10,000m<sup>3</sup> of quarry material</txt></block></tli></tlist></block></entry><entry colname="3" align="right" valign="top" id="sch.3-tbl-tblr-oc.3-tble3" guid="_626cd1ab-e58e-4a0f-b113-7f372ebe6735"><block><txt break.before="1">729.00</txt></block></entry></row><row rowsep="0" id="sch.3-tbl-tblr-oc.4" guid="_7159db85-2c92-41ba-aaaf-a76c7070755e"><entry colname="1" align="left" valign="top" id="sch.3-tbl-tblr-oc.4-tble1" guid="_24ef273e-f11d-42fa-a994-44c97a03bd4b"><block><txt break.before="1">2</txt></block></entry><entry colname="2" align="justify" valign="top" id="sch.3-tbl-tblr-oc.4-tble2" guid="_097ee43c-7171-41e4-b5b8-0702945189e6"><block><txt break.before="1">Application to transfer all or part of an allocation (Act, s 82(2)(c)), allowing the removal of—</txt></block></entry><entry colname="3" align="left" valign="top" id="sch.3-tbl-tblr-oc.4-tble3" guid="_b194df95-63a1-48fd-a2b6-5054da856b00"><block><txt break.before="1"/></block></entry></row><row rowsep="0" id="sch.3-tbl-tblr-oc.5" guid="_c56a3c6e-dd0e-4660-a44f-5b5b2a4a785a"><entry colname="1" align="left" valign="top" id="sch.3-tbl-tblr-oc.5-tble1" guid="_43f1e05d-8a0c-49a9-9114-c6829268d9bf"><block><txt break.before="1"/></block></entry><entry colname="2" align="left" valign="top" id="sch.3-tbl-tblr-oc.5-tble2" guid="_4959cfde-1919-4146-8841-79d863eb42f0"><block><tlist number.type="default"><tli id="sch.3-tbl-tblr-oc.5-tble2-para1.a" guid="_21e440e3-ed8a-4622-bca9-aff89569fdd6"><no>(a)</no><block><txt break.before="1">not more than 10,000m<sup>3</sup> of quarry material</txt></block></tli></tlist></block></entry><entry colname="3" align="right" valign="top" id="sch.3-tbl-tblr-oc.5-tble3" guid="_67789b52-11c3-436f-ba04-9538ea4cd2ae"><block><txt break.before="1">76.65</txt></block></entry></row><row rowsep="0" id="sch.3-tbl-tblr-oc.6" guid="_d8fd0a1f-4a1d-40c1-b8ba-e65c3a57c64a"><entry colname="1" align="left" valign="top" id="sch.3-tbl-tblr-oc.6-tble1" guid="_f10d0358-a7a7-492a-a511-913798c2d717"><block><txt break.before="1"/></block></entry><entry colname="2" align="left" valign="top" id="sch.3-tbl-tblr-oc.6-tble2" guid="_a0766ab2-83f7-47cc-aca4-5cdc5e1bb4b7"><block><tlist number.type="default"><tli id="sch.3-tbl-tblr-oc.6-tble2-para1.b" guid="_5e7d9170-6a86-4cd8-97fa-da6744c3204e"><no>(b)</no><block><txt break.before="1">more than 10,000m<sup>3</sup> of quarry material</txt></block></tli></tlist></block></entry><entry colname="3" align="right" valign="top" id="sch.3-tbl-tblr-oc.6-tble3" guid="_9995bead-5622-40fa-9f81-96168db734f2"><block><txt break.before="1">230.20</txt></block></entry></row><row rowsep="0" id="sch.3-tbl-tblr-oc.7" guid="_3e21830b-159b-4d5b-976e-aadda45b46d3"><entry colname="1" align="left" valign="top" id="sch.3-tbl-tblr-oc.7-tble1" guid="_91a2934b-f6ce-4d1f-8101-e1b795006547"><block><txt break.before="1">3</txt></block></entry><entry colname="2" align="justify" valign="top" id="sch.3-tbl-tblr-oc.7-tble2" guid="_c17a067c-da55-4f49-94ba-8071ad3ef047"><block><txt break.before="1">Application to renew an allocation notice (Act, s 83(2)(b)), allowing the removal of—</txt></block></entry><entry colname="3" align="left" valign="top" id="sch.3-tbl-tblr-oc.7-tble3" guid="_d791342a-9ab8-4ad8-a329-b41dc04ccf89"><block><txt break.before="1"/></block></entry></row><row rowsep="0" id="sch.3-tbl-tblr-oc.8" guid="_55261480-1d23-4fe2-b45e-b67827568a23"><entry colname="1" align="left" valign="top" id="sch.3-tbl-tblr-oc.8-tble1" guid="_764621b5-5410-4fea-ac73-94d15fd678f7"><block><txt break.before="1"/></block></entry><entry colname="2" align="left" valign="top" id="sch.3-tbl-tblr-oc.8-tble2" guid="_97fc96b5-dc6d-44a6-827a-9145363b763d"><block><tlist number.type="default"><tli id="sch.3-tbl-tblr-oc.8-tble2-para1.a" guid="_328cbca0-67b7-4bb0-be8e-e60bc0355421"><no>(a)</no><block><txt break.before="1">not more than 10,000m<sup>3</sup> of quarry material</txt></block></tli></tlist></block></entry><entry colname="3" align="right" valign="top" id="sch.3-tbl-tblr-oc.8-tble3" guid="_f528f4cf-2ce3-4717-921d-5bb06c60629a"><block><txt break.before="1">153.40</txt></block></entry></row><row rowsep="0" id="sch.3-tbl-tblr-oc.9" guid="_3558b988-fe0a-4622-8c8a-8565b1e8fe4f"><entry colname="1" align="left" valign="top" id="sch.3-tbl-tblr-oc.9-tble1" guid="_02503674-56dc-4762-a9c2-6074ed4e3532"><block><txt break.before="1"/></block></entry><entry colname="2" align="left" valign="top" id="sch.3-tbl-tblr-oc.9-tble2" guid="_ea46a8ea-58fa-4995-a5e4-65254c435d79"><block><tlist number.type="default"><tli id="sch.3-tbl-tblr-oc.9-tble2-para1.b" guid="_a3184953-3968-4e73-9342-03d572322906"><no>(b)</no><block><txt break.before="1">more than 10,000m<sup>3</sup> of quarry material</txt></block></tli></tlist></block></entry><entry colname="3" align="right" valign="top" id="sch.3-tbl-tblr-oc.9-tble3" guid="_c6a2ccff-56e1-4423-a92e-0cb426738a50"><block><txt break.before="1">461.20</txt></block></entry></row></tbody></tgroup></table></block><historynote><txt break.before="1"><b>sch 3</b> sub 2005 SL No. 152 s 4; 2006 SL No. 164 s 4; 2007 SL No. 159 s 4; 2008 SL No. 207 s 4; 2009 SL No. 98 s 4; 2010 SL No. 162 s 8; 2011 SL No. 135 s 8; 2012 SL No. 114 s 4; 2013 SL No. 204 s 4; 2014 SL No. 115 s 4; 2015 SL No. 62 s 4; 2016 SL No. 79 s 4; 2017 SL No. 82 s 4</txt></historynote></schedule><schedule id="sch.4" guid="_20fe65b3-f20e-4b3c-92b9-653dc5ea3903" type="schedule" affected.by.uncommenced="0" spent.amends="0" numbering.style="manual" provision.type="other"><no>Schedule 4</no><heading id="sch.4-he" guid="_e8ddca8a-7c94-467a-8425-389e0c65d641">Royalty payable for removal of quarry material</heading><sourceref id="sch.4-ref" guid="_549becca-8a9e-468c-bbac-2ae8d9835e50" affected.by.uncommenced="0">section&#160;7</sourceref><block><table frame="none" colsep="0" rowsep="0" orient="port" id="sch.4-tbl" guid="_d0ac1904-82dd-4abd-ae6d-efb02785d8c0" heading.align="left" font.size="12.pt"><tgroup cols="3" colsep="0" rowsep="0" tgroupstyle="3columnUnRuled"><colspec colnum="1" colname="1" colwidth="0.331in" colsep="0"/><colspec colnum="2" colname="2" colwidth="3.510in" colsep="0"/><colspec colnum="3" colname="3" colwidth="1.159in" colsep="0"/><thead><row rowsep="0" id="sch.4-tbl-tblh-tblr" guid="_1093f738-444f-49d2-a810-4be669f90008"><entry colname="1" align="left" valign="top" id="sch.4-tbl-tblh-tblr-tble1" guid="_fc3dc90e-01cb-4ec9-8c7a-333ef5163a6a"><block><txt break.before="1"/></block></entry><entry colname="2" align="left" valign="top" id="sch.4-tbl-tblh-tblr-tble2" guid="_1c4d7ef3-690c-4fc4-b522-f182bd2e75ec"><block><txt break.before="1"/></block></entry><entry colname="3" align="right" valign="top" id="sch.4-tbl-tblh-tblr-tble3" guid="_526c80a2-cb7c-4e14-b39c-e50810997691"><block><txt break.before="1">$</txt></block></entry></row></thead><tbody><row rowsep="0" id="sch.4-tbl-tblr" guid="_7632f08a-a92b-4890-b398-1bb7fdd7e831"><entry colname="1" align="left" valign="top" id="sch.4-tbl-tblr-tble1" guid="_fadfc757-5bf6-4e5d-937b-584700fd78e6"><block><txt break.before="1">1</txt></block></entry><entry colname="2" align="justify" valign="top" id="sch.4-tbl-tblr-tble2" guid="_59a630c1-dc7c-4e54-89a1-e0ac448efbac"><block align="justify"><txt break.before="1">Royalty for quarry material removed under an allocation notice (Act, s 102(1))—for each cubic metre removed—</txt></block></entry><entry colname="3" align="left" valign="bottom" id="sch.4-tbl-tblr-tble3" guid="_ecd7cfc9-a83e-4ec6-b7a1-6182b426b601"><block><txt break.before="1"/></block></entry></row><row rowsep="0" id="sch.4-tbl-tblr-oc.2" guid="_c28da073-f849-43a6-9a06-61eff72a422b"><entry colname="1" align="left" valign="top" id="sch.4-tbl-tblr-oc.2-tble1" guid="_2a048b79-35d3-4b1b-8b9c-a53ee4c98fa1"><block><txt break.before="1"/></block></entry><entry colname="2" align="left" valign="top" id="sch.4-tbl-tblr-oc.2-tble2" guid="_2b9198b2-c6a0-4efa-8a37-d607edd4a5f5"><block><tlist number.type="default"><tli id="sch.4-tbl-tblr-oc.2-tble2-para1.a" guid="_14e327a9-28b5-410b-b503-88fe95e8cac4"><no>(a)</no><block><txt break.before="1">by a government body or a statutory authority for its own use</txt></block></tli></tlist></block></entry><entry colname="3" align="right" valign="bottom" id="sch.4-tbl-tblr-oc.2-tble3" guid="_c87571bf-8f35-4518-9289-f78fafb9ec5b"><block><txt break.before="1">0.72</txt></block></entry></row><row rowsep="0" id="sch.4-tbl-tblr-oc.3" guid="_de639bf8-5ed4-42be-a512-85755f8a435a"><entry colname="1" align="left" valign="top" id="sch.4-tbl-tblr-oc.3-tble1" guid="_994f723a-5235-482f-ba67-cba184d3f86f"><block><txt break.before="1"/></block></entry><entry colname="2" align="left" valign="top" id="sch.4-tbl-tblr-oc.3-tble2" guid="_87394f26-3af0-4202-bea7-9a47dabdc112"><block><tlist number.type="default"><tli id="sch.4-tbl-tblr-oc.3-tble2-para1.b" guid="_789a67ae-adec-447e-b899-664c08e36a9b"><no>(b)</no><block><txt break.before="1">otherwise</txt></block></tli></tlist></block></entry><entry colname="3" align="right" valign="top" id="sch.4-tbl-tblr-oc.3-tble3" guid="_24f35f41-e88b-42c5-a087-b255b2f7caab"><block><txt break.before="1">2.10</txt></block></entry></row></tbody></tgroup></table></block><historynote><txt break.before="1"><b>sch 4</b> sub 2005 SL No. 152 s 4; 2006 SL No. 164 s 4; 2007 SL No. 159 s 4; 2008 SL No. 207 s 4</txt></historynote><historynote><txt break.before="1">amd 2008 SL No. 333 s 3</txt></historynote><historynote><txt break.before="1">sub 2009 SL No. 98 s 5; 2010 SL No. 162 s 8; 2011 SL No. 135 s 8</txt></historynote><historynote><txt break.before="1">amd 2012 SL No. 2 s 10</txt></historynote><historynote><txt break.before="1">sub 2012 SL No. 114 s 4; 2013 SL No. 204 s 4; 2014 SL No. 115 s 4; 2015 SL No. 62 s 4; 2016 SL No. 79 s 4; 2017 SL No. 82 s 5</txt></historynote></schedule><schedule id="sch.4A" guid="_d5bb1b8c-13b3-4f57-9eb0-5e76709de3eb" type="schedule" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>Schedule 4A</no><heading id="sch.4A-he" guid="_5e5b85cb-6e78-46af-83c7-ec7ab3fcfded">Code for assessable development that is prescribed tidal works</heading><sourceref id="sch.4A-ref" guid="_768faadc-25bd-4c7c-a82e-367908fc76eb" affected.by.uncommenced="0">section&#160;14</sourceref><historynote><txt break.before="1"><b>sch hdg</b> sub 2017 SL No. 103 s 28</txt></historynote><part id="sch.4A-pt.1" guid="_394c143e-1a60-4336-a90a-7df1e0cb043d" affected.by.uncommenced="0"><no>Part 1</no><heading id="sch.4A-pt.1-he" guid="_f340f125-48c0-4c27-ba71-3b9b791ddf6c">Preliminary</heading><clause id="sch.4A-sec.1" guid="_43ef0d86-605c-40df-83cc-69b5779e1a4e" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>1</no><heading id="sch.4A-sec.1-he" guid="_97816b98-2d24-414f-b3d2-19cc7e065337">Application of code</heading><block><txt break.before="1">For section 167(5)(a) and (c) of the Act, this code—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.4A-sec.1-para1.a" guid="_15804935-8f99-4d49-add0-9043e8aeece8" provision.type="other"><no>(a)</no><block><txt break.before="0">is an assessment benchmark for the Planning Act; and</txt></block></li><li id="sch.4A-sec.1-para1.b" guid="_4d6e94cb-7b17-4a57-8ad3-6a3cb54733a1" provision.type="other"><no>(b)</no><block><txt break.before="0">prescribes, for section 19(1)(b) of the Planning Act, the extent to which a local government may apply a planning scheme as a categorising instrument under that Act in relation to tidal works in the tidal area for its local government area, as defined under that Act.</txt></block></li></list></block><historynote><txt break.before="1"><b>s 1</b> sub 2017 SL No. 103 s 29</txt></historynote></clause><clause id="sch.4A-sec.2" guid="_e2ae948a-99ab-4a84-af72-fd4271a083fc" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>2</no><heading id="sch.4A-sec.2-he" guid="_2874f481-4454-45b9-8147-050be591aa0e">Purpose of code</heading><block><txt break.before="1">The purpose of this code is to ensure prescribed tidal work—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.4A-sec.2-para1.a" guid="_bc669011-b537-4221-bd49-b590c5cee023" provision.type="other"><no>(a)</no><block><txt break.before="0">is compatible with the character and amenity of its surrounding area; and</txt></block></li><li id="sch.4A-sec.2-para1.b" guid="_ef660c37-0756-44dd-8e53-3765b32be125" provision.type="other"><no>(b)</no><block><txt break.before="0">is designed and constructed in a way to ensure it is structurally sound; and</txt></block></li><li id="sch.4A-sec.2-para1.c" guid="_a315d5f6-5dfe-4359-9ff9-abf49feee089" provision.type="other"><no>(c)</no><block><txt break.before="0">is safe for use; and</txt></block></li><li id="sch.4A-sec.2-para1.d" guid="_93242ef1-14e0-41c7-b207-a3223fd375f6" provision.type="other"><no>(d)</no><block><txt break.before="0">is adequately serviced with infrastructure, including, for example, infrastructure for the supply of water or the discharge of sewage; and</txt></block></li><li id="sch.4A-sec.2-para1.e" guid="_dc71b220-3093-477f-a97e-b79832f52a9d" provision.type="other"><no>(e)</no><block><txt break.before="0">involves only minimal use of tidal water in a canal, for a non-maritime purpose; and</txt></block></li><li id="sch.4A-sec.2-para1.f" guid="_8c947f33-a875-4d35-a775-141bdfb06b70" provision.type="other"><no>(f)</no><block><txt break.before="0">does not cause a significant adverse effect to any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.4A-sec.2-para1.f-para2.i" guid="_025be2f0-a1a5-4bdb-8266-a5d6d51dfe2f" provision.type="other"><no>(i)</no><block><txt break.before="0">existing public access to any foreshores or any tidal water;</txt></block></li><li id="sch.4A-sec.2-para1.f-para2.ii" guid="_d4bc54c7-afb5-4206-ab5f-26435c4675df" provision.type="other"><no>(ii)</no><block><txt break.before="0">navigable access to, or navigable egress from, any non-tidal work lot;</txt></block></li><li id="sch.4A-sec.2-para1.f-para2.iii" guid="_a4b0a8cd-0588-4a2a-ba43-545b0e2a2315" provision.type="other"><no>(iii)</no><block><txt break.before="0">the natural features of any tidal water, including, for example, the water quality and bed and banks of the tidal water;</txt></block></li><li id="sch.4A-sec.2-para1.f-para2.iv" guid="_f9acb905-add8-44e3-bfe5-3541a57c8ed4" provision.type="other"><no>(iv)</no><block><txt break.before="0">the structural integrity, operation or maintenance of any existing structure.</txt></block></li></list></block></li></list></block><historynote><txt break.before="1"><b>s 2</b> amd 2017 SL No. 103 s 30</txt></historynote></clause><clause id="sch.4A-sec.3" guid="_70e561fa-db19-472e-b505-a35fc656faa2" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>3</no><heading id="sch.4A-sec.3-he" guid="_717ee810-815a-41dd-842c-80e3474fad74">Definitions</heading><block><txt break.before="1">In this code—</txt><deflist><definition id="sch.4A-sec.3-def.1probabilityfloodevent_" guid="_6c89004f-5b0f-424f-a3b9-1dc4423063ec" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.1probabilityfloodevent" guid="_ff141b09-a5d6-449c-8172-6a7e0d6b7709" type="definition">1% probability flood event</defterm> means a rise in tidal water levels to a level that has a 1% probability of occurring in any 1 year.</txt><historynote><txt break.before="1">def <defterm guid="_3aa3db70-b6bf-41f6-b7e9-5fe0408b4361" type="mention">1% probability flood event</defterm> ins <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0021" target.version.series="d6d5a3c5-2199-4876-8c60-f6961840b188" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;21</legref> s 7(1)</txt></historynote></definition><definition id="sch.4A-sec.3-def.AustralianStandard_" guid="_5efb546c-9237-4660-a42c-7b5a2be5777b" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.AustralianStandard" guid="_a8d1026a-1070-4dc4-9505-04c2c126745a" type="definition">Australian Standard</defterm> includes a standard jointly made or published by Standards Australia and Standards New Zealand.</txt></definition><definition id="sch.4A-sec.3-def.axleload_" guid="_ae18b08a-22af-4177-9392-833020c325a1" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.axleload" guid="_72f27450-1f97-4a24-981b-f5012c1f04f3" type="definition">axle load</defterm> means the load applied through the axle of a vehicle.</txt></definition><definition id="sch.4A-sec.3-def.bedandbanks_" guid="_49686808-b253-4fda-9d56-9e939c996cfe" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.bedandbanks" guid="_05bdbe17-37c4-4352-b967-36426ec777ce" type="definition">bed and banks</defterm>, of tidal water, means land over which the tidal water ordinarily flows or that is ordinarily covered by the tidal water, whether permanently or intermittently; but does not include adjacent land that is from time to time covered by floodwater.</txt></definition><definition id="sch.4A-sec.3-def.concentratedliveload_" guid="_920c811f-52cd-479f-9e4c-fc6acc807013" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.concentratedliveload" guid="_b0913d62-a7df-4f86-a9b3-0e05d43af088" type="definition">concentrated live load</defterm>, in relation to a structure, means a live load that is not uniformly distributed over the structure.</txt></definition><definition id="sch.4A-sec.3-def.deadload_" guid="_acb6fcb1-f5f2-4bf2-a299-0a0491c442cd" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.deadload" guid="_30511dc4-b973-462c-ad2a-6570b131f692" type="definition">dead load</defterm>, of prescribed tidal work, means the total load applied to the work by—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.4A-sec.3-def.deadload-para1.a" guid="_a12ab153-a08a-41ef-bba4-4626b7b359c6" provision.type="other"><no>(a)</no><block><txt break.before="0">the structural components of the work; and</txt></block></li><li id="sch.4A-sec.3-def.deadload-para1.b" guid="_a556c68d-11ed-49c0-974d-bab17a0435b9" provision.type="other"><no>(b)</no><block><txt break.before="0">anything permanently on or attached to the work, including, for example, a partition or machinery permanently fixed to the work.</txt></block></li></list></definition><definition id="sch.4A-sec.3-def.distributedliveload_" guid="_bda2ea0f-5492-462a-85b7-aa9d4ede6d1a" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.distributedliveload" guid="_9b488b78-0a50-459c-911f-9e4432aeb238" type="definition">distributed live load</defterm>, in relation to a structure or a part of a structure, means a live load that is uniformly distributed over the structure or the part.</txt></definition><definition id="sch.4A-sec.3-def.extendedsideboundary_" guid="_5aa6a4f0-b3b9-4ce0-bd59-fac4f2ccb3a5" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.extendedsideboundary" guid="_eebb4f87-5476-4d22-90d3-1172d9f42b2a" type="definition">extended side boundary</defterm>, of a lot connected to prescribed tidal work, means a notional boundary worked out by extending a side boundary of the lot into tidal water—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.4A-sec.3-def.extendedsideboundary-para1.a" guid="_43481048-4d7d-440b-9b1a-743a9e8cc8f6" provision.type="other"><no>(a)</no><block><txt break.before="0">in a continuing straight line; or</txt></block></li><li id="sch.4A-sec.3-def.extendedsideboundary-para1.b" guid="_8c7c1117-d808-4490-923c-ec0f14234f80" provision.type="other"><no>(b)</no><block><txt break.before="0">if extending the side boundary into tidal water in a continuing straight line would reduce the unimpeded navigable access to, or egress from, an adjoining lot to less than 3m or cause a significant adverse affect to navigational safety—at an angle that ensures—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.4A-sec.3-def.extendedsideboundary-para1.b-para2.i" guid="_b6c82e5e-b976-4a97-9cae-d8ffd0f26e57" provision.type="other"><no>(i)</no><block><txt break.before="0">the unimpeded navigable access to, or egress from, any adjoining lot is not reduced to less than 3m; and</txt></block></li><li id="sch.4A-sec.3-def.extendedsideboundary-para1.b-para2.ii" guid="_6734ad45-14d4-4447-8164-1307194407a8" provision.type="other"><no>(ii)</no><block><txt break.before="0">no significant adverse affect is caused to navigational safety.</txt></block></li></list></block></li></list></definition><definition id="sch.4A-sec.3-def.factorofsafety_" guid="_95b8cb37-ac91-4de8-8e8e-14215f1671d8" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.factorofsafety" guid="_fee54595-d752-4b4e-a624-a9c03741244e" type="definition">factor of safety</defterm>, of a retaining wall, revetment or seawall, means the number worked out by dividing the total forces of the retaining wall, revetment or seawall that resist overturning or sliding by the total forces of the retaining wall, revetment or seawall that cause overturning or sliding.</txt></definition><definition id="sch.4A-sec.3-def.foreshore_" guid="_f00808d2-6fea-4705-834e-685a21da3209" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.foreshore" guid="_94f9b251-91a2-4425-8fe1-bd2500889780" type="definition">foreshore</defterm> means the part of the shore between the low water mark and highest astronomical tide.</txt></definition><definition id="sch.4A-sec.3-def.foundationsupport_" guid="_f76e921a-d360-42c5-b735-f53fdc9e6994" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.foundationsupport" guid="_fe5fba52-107b-4528-9a95-fd44f6b63414" type="definition">foundation support</defterm>, for a bridge, means anything that can be used to support the bridge, including, for example, an anchor, footing or pile.</txt></definition><definition id="sch.4A-sec.3-def.groupuse_" guid="_a2c2a1e6-7ddd-4e82-ab3a-a5f9e0fba176" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.groupuse" guid="_7daf226b-e5f2-4e31-af23-bb1e06b42b60" type="definition">group use</defterm>, of a structure, means use of the structure other than individual use of the structure.</txt></definition><definition id="sch.4A-sec.3-def.highestastronomicaltide_" guid="_b8f2d6c1-d0de-401e-9998-f83d71873d02" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.highestastronomicaltide" guid="_058a9bc3-b952-491b-be03-0b65093ce22f" type="definition">highest astronomical tide</defterm> means the highest level of the tides that can be predicted to occur under average meteorological conditions and under any combination of astronomical conditions.</txt></definition><definition id="sch.4A-sec.3-def.independentdeck_" guid="_ba7a6b04-2b5c-4e13-92bd-07023c2a9dc3" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.independentdeck" guid="_0d5f723d-4040-4519-90b0-b3f0308b230e" type="definition">independent deck</defterm> means a structure that—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.4A-sec.3-def.independentdeck-para1.a" guid="_5768021a-75a4-49b3-9e85-cd7ab1281bd3" provision.type="other"><no>(a)</no><block><txt break.before="0">consists only of a deck and components to structurally support the deck; and</txt></block></li><li id="sch.4A-sec.3-def.independentdeck-para1.b" guid="_a947e5ad-d5b2-4f04-a827-a17883d68790" provision.type="other"><no>(b)</no><block><txt break.before="0">is not connected with another structure that is tidal work.</txt></block></li></list><note id="sch.4A-sec.3-def.independentdeck-note" guid="_04293929-9e0a-49b5-b76f-98eb24f79e06" type="example"><heading id="sch.4A-sec.3-def.independentdeck-note-he" guid="_c5a1df50-08e8-48f5-b8e1-f861572a7284">Examples of a deck that is connected with another structure that is tidal work—</heading><block><list number.type="manual" unnumbered.indent="0"><li id="sch.4A-sec.3-def.independentdeck-note-para1" guid="_da98e1ef-f10e-4c70-b21d-c102514b1927" provision.type="other"><no>•</no><block><txt break.before="0">the deck of a jetty</txt></block></li><li id="sch.4A-sec.3-def.independentdeck-note-para1-oc.2" guid="_f5c30ffe-1122-478a-b510-c5a104942bc7" provision.type="other"><no>•</no><block><txt break.before="0">the deck of a pontoon</txt></block></li></list></block></note></definition><definition id="sch.4A-sec.3-def.individualuse_" guid="_8101d1f5-d2a8-4c01-9747-5968414d9f87" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.individualuse" guid="_72753373-fa68-4054-a303-ab4df99fc1a3" type="definition">individual use</defterm>, of a structure, means use of the structure—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.4A-sec.3-def.individualuse-para1.a" guid="_76b1d992-c73d-43d7-b3dd-be287a12e99c" provision.type="other"><no>(a)</no><block><txt break.before="0">that is by persons from only 1 residence, place of business or parcel of vacant land; and</txt></block></li><li id="sch.4A-sec.3-def.individualuse-para1.b" guid="_dc889fde-dcff-472e-aae2-782e69cd96f8" provision.type="other"><no>(b)</no><block><txt break.before="0">that is not by a group of persons in the course of activities of an association, society, body or other entity.</txt><note id="sch.4A-sec.3-def.individualuse-para1.b-note" guid="_7c1cd0e5-cd6a-4663-b338-451783338565" type="example"><heading id="sch.4A-sec.3-def.individualuse-para1.b-note-he" guid="_cff6646c-af75-4253-b95d-bf3d0fcc5685">Examples of associations, societies, bodies or other entities for paragraph (b)—</heading><block><txt break.before="1">sporting or recreational club, youth group, youth organisation, scout or guide group, school or university, environmental education group</txt></block></note></block></li></list></definition><definition id="sch.4A-sec.3-def.kilonewton_" guid="_3caee544-4f5e-4a4c-94b7-be949b8b80d8" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.kilonewton" guid="_f3095023-2373-4ce3-90d4-21c85a097953" type="definition">kilonewton</defterm> means a unit of force equal to 1,000 newtons.</txt></definition><definition id="sch.4A-sec.3-def.kN_" guid="_4916d673-0396-412c-a99c-d6c3e3c84a59" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.kN" guid="_daf7300e-aaea-4e1e-a488-a38c6cac6d38" type="definition">kN</defterm> means kilonewton.</txt></definition><definition id="sch.4A-sec.3-def.kPa_" guid="_e04eaf7d-d1c5-4b49-b0c5-29bc9043292f" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.kPa" guid="_992003a9-222d-498e-8f91-01bed91cc5b7" type="definition">kPa </defterm>means kilopascal.</txt></definition><definition id="sch.4A-sec.3-def.lightingstandard_" guid="_42563269-71d3-4eba-bcbb-77da12e4a081" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.lightingstandard" guid="_6e121860-7aad-49a3-9670-acf16e0bb78e" type="definition">lighting standard</defterm> means each of the following Australian Standards—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.4A-sec.3-def.lightingstandard-para1.a" guid="_f7bd0f4b-5c26-4b2c-b9ef-15e370e07bfb" provision.type="other"><no>(a)</no><block><txt break.before="0">AS/NZS 1158.6:2004—Lighting for roads and public spaces—Luminaries;</txt></block></li><li id="sch.4A-sec.3-def.lightingstandard-para1.b" guid="_5faa2e18-fadb-4423-bfee-d10e2d8a735b" provision.type="other"><no>(b)</no><block><txt break.before="0">AS/NZS 1158.3.1:1999—Road lighting—Pedestrian area (category P) lighting—Performance and installation design requirements;</txt></block></li><li id="sch.4A-sec.3-def.lightingstandard-para1.c" guid="_705b4726-07c0-48ec-9d4d-537ea1f51090" provision.type="other"><no>(c)</no><block><txt break.before="0">AS 4282-1997—Control of the obtrusive effects of outdoor lighting.</txt></block></li></list></definition><definition id="sch.4A-sec.3-def.liveload_" guid="_17a9ef08-38fb-43bf-bdce-1cb4318c0713" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.liveload" guid="_36b8d23a-ee42-401c-b311-dec7158bfada" type="definition">live load</defterm>, in relation to a structure, means the total load applied to the structure by anything temporarily on or attached to the structure.</txt></definition><definition id="sch.4A-sec.3-def.load_" guid="_0cb5d6bc-5380-4b7e-9b9b-ff6a364829c5" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.load" guid="_ac89944a-bf38-424b-9b13-23be0bd5f95a" type="definition">load </defterm>means weight, force or pressure.</txt></definition><definition id="sch.4A-sec.3-def.lot_" guid="_4a8fecf1-b53d-48b8-9bf8-dfeab5e7b905" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.lot" guid="_1e9f66fe-8e15-4940-9ae4-57ec8d5b574e" type="definition">lot </defterm>includes a parcel of unallocated State land.</txt></definition><definition id="sch.4A-sec.3-def.majorwharf_" guid="_bde47f48-ee65-4cfa-b7fe-c05435e44ff8" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.majorwharf" guid="_9dbb70a4-59a9-4379-915b-6f33ac45fa30" type="definition">major wharf </defterm>means a wharf the construction of which—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.4A-sec.3-def.majorwharf-para1.a" guid="_9d729d99-e15e-4ccc-b00e-c46a08963ae1" provision.type="other"><no>(a)</no><block><txt break.before="0">has significantly disturbed, or will significantly disturb, the substrate, flora or fauna in the locality within which the wharf is located; or</txt></block></li><li id="sch.4A-sec.3-def.majorwharf-para1.b" guid="_53028965-e06c-4bb5-b091-dff1b8d95c73" provision.type="other"><no>(b)</no><block><txt break.before="0">has caused, or will cause, a significant isolation of parts of land or tidal water in the locality within which the wharf is located, including, for example, the bed and banks of tidal water.</txt></block></li></list></definition><definition id="sch.4A-sec.3-def.marineplant_" guid="_0930a9ce-6138-4f65-9f0e-94f23182a6b7" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.marineplant" guid="_1a1f909f-a1e4-4453-81d2-680423bc3086" type="definition">marine plant</defterm> see the <legref jurisd="QLD" type="act" target.doc.id="act-1994-037" target.version.series="d7ebcb19-f312-46a5-9a6f-59793df30f39" check="valid"><name emphasis="yes">Fisheries Act 1994</name></legref>, <legref jurisd="QLD" type="act" refid="sec.8" target.doc.id="act-1994-037" target.version.series="d7ebcb19-f312-46a5-9a6f-59793df30f39" check="invalid">section&#160;8</legref>.</txt></definition><definition id="sch.4A-sec.3-def.minorwharf_" guid="_b93df93a-ae2c-476c-8615-0958e63cb678" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.minorwharf" guid="_685a53ae-e60c-4a3e-afb8-6410183e063f" type="definition">minor wharf </defterm>means a wharf that is not a major wharf.</txt></definition><definition id="sch.4A-sec.3-def.nonprivatepurpose_" guid="_067e9bbb-f0fc-48e3-8eac-314472b703d2" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.nonprivatepurpose" guid="_4c5ecf9b-2851-4aab-8cda-69057e6ef022" type="definition">non-private purpose</defterm> means a purpose other than a private purpose.</txt></definition><definition id="sch.4A-sec.3-def.nontidalworklot_" guid="_1157be92-e09f-46a3-8562-64a6044bd74e" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.nontidalworklot" guid="_8681d1ec-f08a-443c-a3d3-5dd6cab9a4c6" type="definition">non-tidal work lot</defterm> means a lot that is not, and never was, the subject of any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.4A-sec.3-def.nontidalworklot-para1.a" guid="_5904edfe-9a0b-4056-b7c2-703b4eb91a66" provision.type="other"><no>(a)</no><block><txt break.before="0">a development approval for prescribed tidal work;</txt></block></li><li id="sch.4A-sec.3-def.nontidalworklot-para1.b" guid="_cc001345-b784-490a-8e25-bf634fa879fc" provision.type="other"><no>(b)</no><block><txt break.before="0">a development approval for tidal works that are not prescribed tidal work;</txt></block></li><li id="sch.4A-sec.3-def.nontidalworklot-para1.c" guid="_c310801c-3b99-44c2-87cb-585ccf79ffe2" provision.type="other"><no>(c)</no><block><txt break.before="0">a deemed approval.</txt></block></li></list></definition><definition id="sch.4A-sec.3-def.pontoon_" guid="_f0ac552a-5795-4919-952c-45ed2dbf161f" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.pontoon" guid="_90e7cbc1-5310-4fc4-8c1e-b87f74f721d1" type="definition">pontoon</defterm> means a structure consisting of the following components—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.4A-sec.3-def.pontoon-para1.a" guid="_39f2dfaa-635c-4c0d-805b-6dd5dd768dd2" provision.type="other"><no>(a)</no><block><txt break.before="0">a flotation unit;</txt></block></li><li id="sch.4A-sec.3-def.pontoon-para1.b" guid="_49d4f638-17e5-4ead-bff6-c513455089b9" provision.type="other"><no>(b)</no><block><txt break.before="0">an access walkway for the flotation unit;</txt></block></li><li id="sch.4A-sec.3-def.pontoon-para1.c" guid="_986b3af6-87ac-491e-ad99-d5fc3ec56cc6" provision.type="other"><no>(c)</no><block><txt break.before="0">a system for mooring the flotation unit and access walkway;</txt></block></li><li id="sch.4A-sec.3-def.pontoon-para1.d" guid="_7cedc2b9-f2c2-4c9c-8659-de2a67e8114a" provision.type="other"><no>(d)</no><block><txt break.before="0">an abutment.</txt></block></li></list></definition><definition id="sch.4A-sec.3-def.privateboatramp_" guid="_ac80ca1a-62bc-4aad-8ada-5abebe39cdea" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.privateboatramp" guid="_4962ffe8-d99b-425f-9184-528b06f9a173" type="definition">private boat ramp</defterm> means a boat ramp used for a private purpose.</txt></definition><definition id="sch.4A-sec.3-def.privatepurpose_" guid="_5ee6ad98-b4b2-4d21-9e16-3b1f78b185fa" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.privatepurpose" guid="_148787b3-ce7e-4fc9-ab29-db2b722e7034" type="definition">private purpose</defterm> means a purpose related only to either or both of the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.4A-sec.3-def.privatepurpose-para1.a" guid="_6a793575-fc15-4ea9-b9c3-3a37fa738f75" provision.type="other"><no>(a)</no><block><txt break.before="0">use of a boat used only for recreation;</txt></block></li><li id="sch.4A-sec.3-def.privatepurpose-para1.b" guid="_4a1cfd17-6ff9-4e2e-9bc8-27aa7252e05a" provision.type="other"><no>(b)</no><block><txt break.before="0">use of land, if the use is only for residential purposes.</txt></block></li></list><historynote><txt break.before="1">def <defterm guid="_ba4bcd76-8032-443d-be72-e7f797c7ffb1" type="mention">private purpose</defterm> ins <legref jurisd="QLD" type="act" target.doc.id="sl-2013-0204" target.version.series="66379cf4-9460-4c09-a4a4-e0cdf9643291" valid.date="as.made" check="valid">2013 SL&#160;No.&#160;204</legref> s 5</txt></historynote></definition><definition id="sch.4A-sec.3-def.privateslipway_" guid="_659f4582-4f2a-446e-ad82-cb81ab81a672" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.privateslipway" guid="_a2618321-b5e3-4aa1-8342-08ab7cf6df4d" type="definition">private slip way </defterm>means a slip way used for a private purpose.</txt></definition><definition id="sch.4A-sec.3-def.probablesolution_" guid="_063b92f2-67f9-4efc-a85a-49da7ad725f0" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.probablesolution" guid="_b08fb3c8-1479-4d54-9db2-7aeb7d5f5a29" type="definition">probable solution</defterm>, for achieving a specific outcome stated in the table, column 1, means the probable solution stated in the table, column 2 opposite the specific outcome.</txt></definition><definition id="sch.4A-sec.3-def.relevantengineeringstandard_" guid="_52a014a0-1ae2-4230-8e6b-c14ed8bf9052" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.relevantengineeringstandard" guid="_2379bcbe-8cc1-4587-836b-de66fafb303b" type="definition">relevant engineering standard</defterm>, for prescribed tidal work, means a standard, practice, principle, procedure or other requirement accepted in the engineering industry as being an appropriate standard, practice, principle, procedure or requirement for the design or construction of work of that type.</txt></definition><definition id="sch.4A-sec.3-def.relevantloadingmatter_" guid="_e3f45378-79a9-4bc9-9371-ee48feb07837" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.relevantloadingmatter" guid="_55c564c8-0d9f-4c1e-a629-23e7fac6effb" type="definition">relevant loading matter</defterm>, for prescribed tidal work, means each of the following matters, to the extent they affect the load that can be reasonably expected to be applied to the work at any time—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.4A-sec.3-def.relevantloadingmatter-para1.a" guid="_98c5d3fe-a17d-4c4b-93b5-028527dc4beb" provision.type="other"><no>(a)</no><block><txt break.before="0">the purpose or activity for which the work is intended to be used;</txt></block></li><li id="sch.4A-sec.3-def.relevantloadingmatter-para1.b" guid="_39f4d751-bb66-4085-bf4c-dec91574c031" provision.type="other"><no>(b)</no><block><txt break.before="0">the dead load of the work;</txt></block></li><li id="sch.4A-sec.3-def.relevantloadingmatter-para1.c" guid="_31e04dcb-182b-44e5-b77c-ac2262710498" provision.type="other"><no>(c)</no><block><txt break.before="0">the maximum number of people likely to use the work at any time;</txt></block></li><li id="sch.4A-sec.3-def.relevantloadingmatter-para1.d" guid="_e19d9dfb-03fc-4589-81b9-bb36b2c3bf21" provision.type="other"><no>(d)</no><block><txt break.before="0">the maximum number of vehicles likely to be on or moored at the work at any time;</txt></block></li><li id="sch.4A-sec.3-def.relevantloadingmatter-para1.e" guid="_e5573204-683b-41a5-b0a7-19ab3fb2a421" provision.type="other"><no>(e)</no><block><txt break.before="0">the types of vehicles likely to be on or moored at the work;</txt></block></li><li id="sch.4A-sec.3-def.relevantloadingmatter-para1.f" guid="_d220e460-fbbd-49f4-addd-f864136e7928" provision.type="other"><no>(f)</no><block><txt break.before="0">the height or velocity of waves likely to occur in the tidal water under, within or over which the work is located;</txt></block></li><li id="sch.4A-sec.3-def.relevantloadingmatter-para1.g" guid="_b3a0f24d-a88e-49b3-9ffc-eb66f5a19123" provision.type="other"><no>(g)</no><block><txt break.before="0">any other thing that may be relevant to the load applied to the work at any time, including, for example, environmental factors.</txt></block></li></list></definition><definition id="sch.4A-sec.3-def.relevantplanningscheme_" guid="_c53ca621-537a-44f0-8d8e-ee3c8d2289b1" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.relevantplanningscheme" guid="_dc1e3572-65ca-405e-9fe6-9d7f470eaaf0" type="definition">relevant planning scheme</defterm>, for prescribed tidal work, means the local government planning scheme applying to the lot connected to the work.</txt></definition><definition id="sch.4A-sec.3-def.relevantplanningschemestandard_" guid="_53d11a9d-b0fa-4a73-aaaa-d99fa07eb303" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.relevantplanningschemestandard" guid="_be51d031-1d88-4665-85cd-f34c56768c3b" type="definition">relevant planning scheme standard</defterm>, in relation to achieving a specific outcome for prescribed tidal work, means a standard—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.4A-sec.3-def.relevantplanningschemestandard-para1.a" guid="_7f41263a-0409-4ef2-a98c-98d6fb23d899" provision.type="other"><no>(a)</no><block><txt break.before="0">stated in the relevant planning scheme for the work; and</txt></block></li><li id="sch.4A-sec.3-def.relevantplanningschemestandard-para1.b" guid="_9866c6ea-9b30-4cb8-bcfa-34e9ec2c2db5" provision.type="other"><no>(b)</no><block><txt break.before="0">relevant to achieving the specific outcome.</txt></block></li></list></definition><definition id="sch.4A-sec.3-def.revetment_" guid="_f40ce747-8a03-4a2c-9f30-7a4c91eaa167" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.revetment" guid="_d11401db-01fe-4a8c-bb23-db8c54dbc81b" type="definition">revetment </defterm>means a wall constructed along the bottom of an embankment to—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.4A-sec.3-def.revetment-para1.a" guid="_dcb01e9a-185e-40f4-8194-8aea85c17aea" provision.type="other"><no>(a)</no><block><txt break.before="0">protect the embankment from erosion; and</txt></block></li><li id="sch.4A-sec.3-def.revetment-para1.b" guid="_addc85e6-444c-4f32-a2cd-22adbdad8d85" provision.type="other"><no>(b)</no><block><txt break.before="0">keep in place the materials that are landward of the wall.</txt></block></li></list></definition><definition id="sch.4A-sec.3-def.roofed_" guid="_ceab0d20-bfea-41c5-b583-ead64200f461" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.roofed" guid="_187a763e-14d3-481a-877b-a5392f69856c" type="definition">roofed</defterm> means covered with a permanent or temporary attachment.</txt><note id="sch.4A-sec.3-def.roofed-note" guid="_49bbfd48-0423-4fb8-a647-915baacef817" type="example"><heading id="sch.4A-sec.3-def.roofed-note-he" guid="_073b88b8-69a1-4db5-aeac-5ec6b3cf2d0a">Examples of temporary attachments—</heading><block><txt break.before="1">tarpaulin, umbrella, wind sail</txt></block></note></definition><definition id="sch.4A-sec.3-def.s62solution_" guid="_1fa9690e-4a32-4604-a3bf-94cb8d741c7c" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.s62solution" guid="_37784b01-a682-4860-bcb7-401f4be4c765" type="definition">s 6(2) solution</defterm> see <intref check="invalid">section&#160;5</intref> of this code.</txt></definition><definition id="sch.4A-sec.3-def.seawall_" guid="_07b64153-feee-45bf-bbe2-b97d2956e2b0" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.seawall" guid="_1df8fc24-7ad9-4eff-b427-efed8fb32cfa" type="definition">seawall</defterm> means a wall constructed along a shoreline to—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.4A-sec.3-def.seawall-para1.a" guid="_9c2857bd-d513-407c-bcb9-75670cefe936" provision.type="other"><no>(a)</no><block><txt break.before="0">prevent the encroachment, by wave action, of the sea past the shoreline; and</txt></block></li><li id="sch.4A-sec.3-def.seawall-para1.b" guid="_3d13c2e8-d3b7-4e2c-aef9-e98a9e6e5cf7" provision.type="other"><no>(b)</no><block><txt break.before="0">keep in place the materials that are landward of the wall.</txt></block></li></list></definition><definition id="sch.4A-sec.3-def.shoreabutment_" guid="_594df9b7-2ebe-4408-a939-25a7503f435c" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.shoreabutment" guid="_034d762d-c6bd-4398-82bc-ca147c27b703" type="definition">shore abutment</defterm> means a solid wall or other structure constructed adjacent to a shoreline to counteract any force applied to the shore by a bridge, independent deck or other structure located on the shore.</txt></definition><definition id="sch.4A-sec.3-def.sideboundary_" guid="_c492d294-df54-4adf-9bbf-b11cce80a2ce" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.sideboundary" guid="_889686de-ef69-4ae3-a6d0-536fa872ff79" type="definition">side boundary</defterm>, of a lot, means a boundary of the lot that meets tidal water but is not a waterfront boundary of the lot.</txt></definition><definition id="sch.4A-sec.3-def.specificoutcome_" guid="_9a2114fa-8dbf-4704-a6a3-4e1e9542882e" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.specificoutcome" guid="_70e5f159-93a7-49c5-a19f-00d8fcf129ec" type="definition">specific outcome</defterm> means an outcome stated in the table, column 1.</txt></definition><definition id="sch.4A-sec.3-def.stormwateroutlet_" guid="_6d6cb22e-ceec-49d8-9626-0910a6e38a8a" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.stormwateroutlet" guid="_4317171a-efc7-4eeb-94b4-4a59eb01db7f" type="definition">stormwater outlet</defterm> means a pipe that is the exit for an artificial passage for stormwater or floodwater.</txt></definition><definition id="sch.4A-sec.3-def.vegetation_" guid="_1cfc8e5b-15ad-46d7-8788-e5011cbe3728" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.vegetation" guid="_6ab8b7d7-0309-41c6-a184-ae78eac8dafe" type="definition">vegetation</defterm> does not include marine plants.</txt></definition><definition id="sch.4A-sec.3-def.vehicle_" guid="_eeb2ab18-db85-4625-bbcc-1d7e2bd32db5" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.vehicle" guid="_bc451fb3-29f3-4b32-9a94-ec4e6eaa6a36" type="definition">vehicle</defterm> includes a boat or other vessel.</txt></definition><definition id="sch.4A-sec.3-def.waterfrontboundary_" guid="_4eb52e11-bed6-4c05-875b-add312e3bbf3" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.3-def.waterfrontboundary" guid="_d7a97700-0ee0-498d-9adb-8aa7cc51f720" type="definition">waterfront boundary</defterm>, of a lot, means a boundary of the lot fronting tidal water.</txt></definition></deflist></block><historynote><txt break.before="1"><b>s 3</b> ins <legref jurisd="QLD" type="act" target.doc.id="sl-2005-0275" target.version.series="b034c269-9d45-4dea-abc9-286d7bdf87c8" valid.date="as.made" check="valid">2005 SL&#160;No.&#160;275</legref> s 4</txt></historynote></clause><clause id="sch.4A-sec.4" guid="_de36e657-077b-4209-9bb9-aebb49c88b9b" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>4</no><heading id="sch.4A-sec.4-he" guid="_2b7a970d-10f1-444c-a18c-1995c4bdbd3f">When lot connected to prescribed tidal work</heading><block><txt break.before="1">For this code, a lot is connected to prescribed tidal work if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.4A-sec.4-para1.a" guid="_033a512b-5a44-4e1c-aba8-bac7b63b4296" provision.type="other"><no>(a)</no><block><txt break.before="0">the work is attached to the lot; or</txt></block></li><li id="sch.4A-sec.4-para1.b" guid="_a61ede1c-c2b1-4df3-a02c-ed77e4fff69b" provision.type="other"><no>(b)</no><block><txt break.before="0">the work is not attached to the lot but is constructed for use in association with the lot.</txt><note id="sch.4A-sec.4-para1.b-note" guid="_b9a10b65-3437-4fe6-8f0e-2893e1300f20" type="example"><heading id="sch.4A-sec.4-para1.b-note-he" guid="_ef1ea499-01d8-4cd1-b95d-b5b03c9cdc82">Example for paragraph (b)—</heading><block><txt break.before="1">a mooring pile near, but not attached to, a lot used for mooring vessels by persons who live on the lot</txt></block></note></block></li></list></block></clause><clause id="sch.4A-sec.5" guid="_3722a1e7-d4ad-45f9-981b-81504d22cf79" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>5</no><heading id="sch.4A-sec.5-he" guid="_98ae55a4-8cce-4c40-8681-2cf7e01a27e7">References to s 6(2) solution in probable solution</heading><block><txt break.before="1">In the table, a reference to the words ‘s 6(2) solution’, in brackets, before a probable solution is a reference to the requirement, under <intref check="invalid">section&#160;6</intref><intref check="invalid">(2)</intref> of this code, that the probable solution must be complied with to achieve the specific outcome stated opposite the solution.</txt></block></clause></part><part id="sch.4A-pt.2" guid="_a1a596e3-5fc9-4f54-9312-ce84f0ea04f1" affected.by.uncommenced="0"><no>Part 2</no><heading id="sch.4A-pt.2-he" guid="_69e02730-1b3c-463c-8c81-2ebbea433045">Compliance with code</heading><clause id="sch.4A-sec.6" guid="_7d551809-8a3b-4f02-a051-db4f01189ab9" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>6</no><heading id="sch.4A-sec.6-he" guid="_65a29de2-3e22-41df-8e6f-7aea97e3a2c0">How to comply with code</heading><subclause id="sch.4A-sec.6-ssec.1" guid="_896ebd8c-7981-45be-9152-bc1963ebb494" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This code is complied with for prescribed tidal work if each specific outcome applying to the work is achieved.</txt></block></subclause><subclause id="sch.4A-sec.6-ssec.2" guid="_aab15e42-eb8b-4e2a-8981-731bee4f86fc" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">A specific outcome mentioned in item 12.10, 13.1, 13.2, 15.1, 15.2, 16.1, 16.2, 16.4, 17.1, 18.1, 18.2, 18.3, 18.4, 18.7, 19.1, 19.2, 19.3 or 20.1 of the table is achieved only if the probable solution for achieving the outcome is complied with.</txt></block></subclause><subclause id="sch.4A-sec.6-ssec.3" guid="_9cd660f2-7485-49c9-854e-631e62789fb6" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, a specific outcome mentioned in any of items 12.1 to 12.10, 13.1, 13.2, 14.1, 14.2, 15.1 to 15.3, 16.1 to 16.4, 17.1, 18.1 to 18.6, 19.1 to 19.4 and 20.1 of the table is achieved only if the works carried out to comply with the probable solution for achieving the outcome are appropriately certified.</txt></block></subclause><subclause id="sch.4A-sec.6-ssec.4" guid="_36cc768d-d35f-48f9-847d-6fba08e3207a" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">A probable solution for achieving a specific outcome, other than a specific outcome mentioned in <intref check="invalid">subsection&#160;(2)</intref>, provides a guide for how the outcome may be achieved.</txt></block></subclause><subclause id="sch.4A-sec.6-ssec.5" guid="_9eceb47d-50a7-4324-b2be-2d5ebafd5663" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sch.4A-sec.6-ssec.5-def.appropriatelycertified_" guid="_293d753a-fee5-4d76-9b46-de0211908d72" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.6-ssec.5-def.appropriatelycertified" guid="_7a36d8d8-d799-4099-abb1-776276cad3a4" type="definition">appropriately certified</defterm>, for works carried out to comply with a probable solution for achieving a specific outcome, means the works have been certified by a relevant engineer as having been carried out appropriately for the achievement of the outcome.</txt></definition><definition id="sch.4A-sec.6-ssec.5-def.relevantengineer_" guid="_4ae0a184-422e-4dd8-b38b-eb439b201567" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.6-ssec.5-def.relevantengineer" guid="_aeb1953a-a4e3-40d7-82ca-55c6bf0d796e" type="definition">relevant engineer</defterm> means a person who, under the <legref jurisd="QLD" type="act" target.doc.id="act-2002-054" target.version.series="b7cf8aa4-8814-465b-ac45-cfbd6a158a10" check="valid"><name emphasis="yes">Professional Engineers Act 2002</name></legref>, is a registered professional engineer in any of the following areas of engineering—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.4A-sec.6-ssec.5-def.relevantengineer-para1.a" guid="_11983082-049b-4a13-9e6b-4da730b07f6c" provision.type="other"><no>(a)</no><block><txt break.before="0">civil engineering;</txt></block></li><li id="sch.4A-sec.6-ssec.5-def.relevantengineer-para1.b" guid="_0d038b98-482d-4c84-8875-a98b7da3e62e" provision.type="other"><no>(b)</no><block><txt break.before="0">marine engineering;</txt></block></li><li id="sch.4A-sec.6-ssec.5-def.relevantengineer-para1.c" guid="_0f2fe93d-dd41-4c61-be4b-a77868af1bb9" provision.type="other"><no>(c)</no><block><txt break.before="0">structural engineering.</txt></block></li></list></definition></deflist></block></subclause><historynote><txt break.before="1"><b>s 6</b> amd <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0021" target.version.series="d6d5a3c5-2199-4876-8c60-f6961840b188" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;21</legref> s 7(2)–(3)</txt></historynote></clause><clause id="sch.4A-sec.7" guid="_49b6ef58-cdb8-4e8a-bd5c-7ae10c9a6eaa" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>7</no><heading id="sch.4A-sec.7-he" guid="_629797cb-243e-491a-8654-a5b6d1c8dca0">Relationship between particular specific outcomes and probable solutions</heading><subclause id="sch.4A-sec.7-ssec.1" guid="_60c8c202-99c7-4fd3-b9a0-088ed920fb3b" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if there is an inconsistency or overlap between—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.4A-sec.7-ssec.1-para1.a" guid="_060561c8-c4e2-40a0-923a-dd5b3bb1f854" provision.type="other"><no>(a)</no><block><txt break.before="0">a specific outcome (a <defterm id="sch.4A-sec.7-ssec.1-def.generalspecificoutcome" guid="_9aef1e3a-f079-4955-80a8-985dc0a603c6" type="definition">general specific outcome</defterm>) mentioned in any item in the table from item 12.1 to item 12.10, inclusive; and</txt></block></li><li id="sch.4A-sec.7-ssec.1-para1.b" guid="_de4ec88c-e468-4364-896d-a0bfd458d2ea" provision.type="other"><no>(b)</no><block><txt break.before="0">a specific outcome (a <defterm id="sch.4A-sec.7-ssec.1-def.directspecificoutcome" guid="_3d90d66b-e7c9-4767-8949-45fad6f8a7d3" type="definition">direct specific outcome</defterm>) mentioned in any item in the table from item 13.1 to item 20.1, inclusive.</txt></block></li></list></block></subclause><subclause id="sch.4A-sec.7-ssec.2" guid="_31214c57-acfc-4102-86df-628a9792f11c" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The direct specific outcome prevails to the extent of the inconsistency or overlap.</txt></block></subclause><subclause id="sch.4A-sec.7-ssec.3" guid="_4531de17-1a92-4427-845e-fffb3a10e0aa" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0"><intref check="invalid">Subsection&#160;(4)</intref> applies if the probable solution for the general specific outcome includes an Australian Standard that is more stringent than a stated direct standard included in the probable solution for the direct specific outcome.</txt></block></subclause><subclause id="sch.4A-sec.7-ssec.4" guid="_c126007d-e61a-4b17-a582-e47250c411c3" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">The probable solution for the direct specific outcome is taken to include the Australian Standard instead of the stated direct standard.</txt><note id="sch.4A-sec.7-ssec.4-note" guid="_70514ffe-df4f-4046-9545-7b3d54ff266d" type="example"><heading id="sch.4A-sec.7-ssec.4-note-he" guid="_b2bfa4ce-b54c-4172-a5f6-8d9ddae3a5ff">Example for <intref check="invalid">subsection&#160;(4)</intref>—</heading><block><txt break.before="1">An Australian Standard mentioned in the probable solution in item 12.1 of the table includes a requirement about the minimum load a boardwalk or independent deck must be able to support and the minimum load is higher than the minimum load stated, for the boardwalk or deck, in paragraph (a) of the probable solution in item 15.1 of the table. Paragraph (a) of the probable solution in item 15.1 is taken to refer to the minimum load stated in the Australian Standard.</txt></block></note></block></subclause><subclause id="sch.4A-sec.7-ssec.5" guid="_a3750002-89b4-43bf-bad5-0a4cc44a7320" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sch.4A-sec.7-ssec.5-def.stateddirectstandard_" guid="_eb826a13-1b64-4d6f-bebb-ec25104f8a67" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4A-sec.7-ssec.5-def.stateddirectstandard" guid="_9c90a0da-ef4d-43fb-a84a-ff953553629f" type="definition">stated direct standard</defterm>, included in the probable solution for a direct specific outcome, means a standard stated in the probable solution, other than a relevant planning scheme standard.</txt></definition></deflist></block></subclause></clause></part><part id="sch.4A-pt.3" guid="_433abd32-608b-4e63-90e0-b20c37bb1b3b" affected.by.uncommenced="0"><no>Part 3</no><heading id="sch.4A-pt.3-he" guid="_889af018-6b5c-4577-8777-c819c82d45df">Specific outcomes and probable solutions</heading><historynote><txt break.before="1">amd <legref jurisd="QLD" type="act" target.doc.id="sl-2014-0021" target.version.series="d6d5a3c5-2199-4876-8c60-f6961840b188" valid.date="as.made" check="valid">2014 SL&#160;No.&#160;21</legref> s 7(4)–(5)</txt></historynote><clause id="sch.4A-sec" guid="_7df6fb2d-a8a7-4e25-a51a-3e214a8728d1" affected.by.uncommenced="0" spent.amends="0" provision.type="other" toc="no"><heading id="sch.4A-sec-he" guid="_ae117011-cf22-4a53-a947-0c3e2defb262">Table</heading><block><table frame="all" colsep="0" rowsep="0" orient="port" id="sch.4A-sec-tbl" guid="_4370627b-5255-499e-9142-5d53a090a1dc" heading.align="left" font.size="12.pt"><tgroup cols="2" colsep="0" rowsep="0" tgroupstyle="2columnRuled"><colspec colnum="1" colname="1" colwidth="2.599in" colsep="0"/><colspec colnum="2" colname="2" colwidth="2.401in" colsep="0"/><thead><row rowsep="0" id="sch.4A-sec-tbl-tblh-tblr" guid="_af572501-2832-46ee-969c-54f63aa9b6f9"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblh-tblr-tble1" guid="_a58c9b34-c3bb-46a2-8fdd-8e08eedf29be"><block><txt break.before="1"><b>Column 1</b></txt></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblh-tblr-tble2" guid="_3e58acdd-f5ca-4870-b77d-b40a9e586b60"><block><txt break.before="1"><b>Column 2</b></txt></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblh-tblr-oc.2" guid="_7da24ec4-ac13-4b4a-a303-df841c68dc9b"><entry colname="1" colsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblh-tblr-oc.2-tble1" guid="_bfb9d7c3-5e4c-4f24-ab59-8bf95efb7637"><block><txt break.before="1"><b>Specific outcome</b></txt></block></entry><entry colname="2" align="left" valign="top" id="sch.4A-sec-tbl-tblh-tblr-oc.2-tble2" guid="_ba0a5ac6-5767-41fd-a40a-5e3ac508bf82"><block><txt break.before="1"><b>A probable solution</b></txt></block></entry></row></thead><tbody><row rowsep="0" id="sch.4A-sec-tbl-tblr" guid="_f1fa5eab-af5b-45b4-8916-4e59341e3902"><entry namest="1" nameend="2" rowsep="1" align="center" valign="top" id="sch.4A-sec-tbl-tblr-tble1" guid="_8e6f25cc-0757-4344-a0b3-6f2093e7efd0"><block><txt break.before="1">Character and amenity (generally)—prescribed tidal work in a canal</txt></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.2" guid="_5524c9f5-72ba-4591-942f-e8fe9c0b9063"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.2-tble1" guid="_658d4bd4-4ef7-40b2-af3c-15db98a0edd1"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.2-tble1-para1.1.1" guid="_33b2ce4c-0675-4471-9a54-97b6fb26725b"><no>1.1</no><block><txt break.before="1">Prescribed tidal work in a canal and for a private purpose is compatible with its location, having regard to the following—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.2-tble1-para1.1.1-para2.a" guid="_af582e60-e057-45d1-b61a-f9dd53dc4eea"><no>(a)</no><block><txt break.before="1">the character and amenity of the work’s immediate surroundings and the locality within which the work is located;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.2-tble1-para1.1.1-para2.b" guid="_38d760ac-37eb-4740-95e8-874e865fc1a0"><no>(b)</no><block><txt break.before="1">if the relevant planning scheme states the desired character or amenity for the work’s immediate surroundings or the locality within which the work is located—the stated desired character or amenity.</txt></block></tli></tlist></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.2-tble2" guid="_65e17ce6-d534-4303-99b7-ed00a93126cb"><block><txt break.before="1">The design and construction of the prescribed tidal work is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.2-tble2-para1.a" guid="_07b32739-bd3b-4c0f-a57a-33ede8216148"><no>(a)</no><block><txt break.before="1">subject to paragraph (c), prescribed tidal work does not extend past the side boundary or extended side boundary of the lot connected to the work;</txt></block></tli></tlist><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.2-tble2-para1.b" guid="_c12ca888-6add-4220-96fe-2a6ced87c019"><no>(b)</no><block><txt break.before="1">subject to paragraph (c), prescribed tidal work is not roofed;</txt></block></tli></tlist><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.2-tble2-para1.c" guid="_a450711e-97fd-4101-9a7b-5fdfeb4164f7"><no>(c)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a) or (b)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a) or (b);</txt></block></tli></tlist><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.2-tble2-para1.d" guid="_d0fbd7ac-5e7b-46fa-b20f-02aa0fe9c634"><no>(d)</no><block><txt break.before="1">any other relevant planning scheme standard that is not inconsistent with the standards mentioned in paragraphs (a) to (c).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.3" guid="_33c4eab7-1227-4542-a43f-a12966ff3fe0"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.3-tble1" guid="_8e038f14-74eb-4c94-ac15-386da9dbffe1"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.3-tble1-para1.1.2" guid="_bb110854-3c18-4669-bb8e-e332e6edd985"><no>1.2</no><block><txt break.before="1">Prescribed tidal work in a canal and for a non-private purpose is compatible with its location, having regard to the following—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.3-tble1-para1.1.2-para2.a" guid="_990b04d9-7c7c-4db1-a65a-986b2d118e30"><no>(a)</no><block><txt break.before="1">the character and amenity of the work’s immediate surroundings and the locality within which the work is located;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.3-tble1-para1.1.2-para2.b" guid="_2bf0be80-8f27-4d2f-9f8c-51fe4aead914"><no>(b)</no><block><txt break.before="1">if the relevant planning scheme states the desired character or amenity for the work’s immediate surroundings or the locality within which the work is located—the stated desired character or amenity.</txt></block></tli></tlist></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.3-tble2" guid="_6cc05d85-764d-4b33-87e1-e58b5732a5fa"><block><txt break.before="1">The design and construction of the prescribed tidal work is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.3-tble2-para1.a" guid="_3c6cc402-03a5-47ab-a3d9-10be3183e01b"><no>(a)</no><block><txt break.before="1">subject to paragraph (c), prescribed tidal work used for a commercial purpose does not extend past the side boundary or extended side boundary of the lot connected to the work;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.3-tble2-para1.b" guid="_ce3dfd53-f2ae-4060-92ad-9fd6bb1cf222"><no>(b)</no><block><txt break.before="1">subject to paragraph (c), prescribed tidal work is not roofed unless it is the main access to land;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.3-tble2-para1.c" guid="_8534b7ec-077f-425b-ac8b-6b2dbb94bbf9"><no>(c)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a) or (b)—the relevant planning scheme standard, to the extent it is more stringent than the standard stated in paragraph (a) or (b);</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.3-tble2-para1.d" guid="_eafe0357-a6c6-4a92-86c4-7ac541a75ec5"><no>(d)</no><block><txt break.before="1">any other relevant planning scheme standard that is not inconsistent with the standards mentioned in paragraphs (a) to (c).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.4" guid="_e671037c-7245-4767-bbc6-83041a184620"><entry namest="1" nameend="2" rowsep="1" align="center" valign="top" id="sch.4A-sec-tbl-tblr-oc.4-tble1" guid="_9e3641c4-3a1c-4d41-86ed-07f96d7185e6"><block><txt break.before="1">Character and amenity (generally)—prescribed tidal work not in a canal</txt></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.5" guid="_bca31f5f-87ff-4831-8a38-8ca8baa516d2"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.5-tble1" guid="_7790be46-0a39-49dc-b85a-afd36a5a5f7d"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.5-tble1-para1.2.1" guid="_5c2283b8-c6e7-421e-925a-bc67fc6c248e"><no>2.1</no><block><txt break.before="1">Prescribed tidal work not in a canal and for a private purpose is compatible with its location, having regard to the following—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.5-tble1-para1.2.1-para2.a" guid="_6f3e528b-8205-47d9-bee8-4184bd48de06"><no>(a)</no><block><txt break.before="1">the character and amenity of the work’s immediate surroundings and the locality within which the work is located;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.5-tble1-para1.2.1-para2.b" guid="_b6989675-5ba9-4074-a2a9-2af8aef73a1b"><no>(b)</no><block><txt break.before="1">if the relevant planning scheme states the desired character or amenity for the work’s immediate surroundings or the locality within which the work is located—the stated desired character or amenity.</txt></block></tli></tlist></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.5-tble2" guid="_cf20f4e0-4ef5-455f-a4ed-fecd104829ff"><block><txt break.before="1">The design and construction of the prescribed tidal work is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.5-tble2-para1.a" guid="_68954d96-1ab8-40ad-abc1-46571da485a1"><no>(a)</no><block><txt break.before="1">subject to paragraph (e), prescribed tidal work does not extend past the side boundary or extended side boundary of the lot connected to the work;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.5-tble2-para1.b" guid="_5339a346-4776-42c5-93a3-188afc60dc2f"><no>(b)</no><block><txt break.before="1">subject to paragraph (e), prescribed tidal work is the only work of its type along the edge of the tidal water fronting the lot connected to the work;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.5-tble2-para1.c" guid="_0f1f83bf-7c38-4cac-9f2c-397745102b77"><no>(c)</no><block><txt break.before="1">subject to paragraph (e), prescribed tidal work that is a boardwalk or independent deck is not roofed;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.5-tble2-para1.d" guid="_aa1006a8-9052-4894-b10c-308a3dee43f3"><no>(d)</no><block><txt break.before="1">subject to paragraph (e), prescribed tidal work other than a boardwalk or deck is not roofed unless it is the main access to land;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.5-tble2-para1.e" guid="_8ba3725c-5346-478f-ae6b-a764a4b60375"><no>(e)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a), (b), (c) or (d)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a), (b), (c) or (d);</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.6" guid="_c79ea886-aa90-4c0e-8d0c-449983e5fc58"><entry colname="1" colsep="1" rowsep="1" id="sch.4A-sec-tbl-tblr-oc.6-tble1" guid="_55db60a3-af77-474b-999e-70ddd305ebcb"/><entry colname="2" rowsep="1" id="sch.4A-sec-tbl-tblr-oc.6-tble2" guid="_ac324512-d25e-4ceb-8488-59d2c39cbfda"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.6-tble2-para1.f" guid="_cd017843-107f-4704-b71e-d31a8758932d"><no>(f)</no><block><txt break.before="1">any other relevant planning scheme standard that is not inconsistent with the standards mentioned in paragraphs (a) to (e).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.7" guid="_2ef9d7fc-eef6-4179-9682-c5f3cf310a83"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.7-tble1" guid="_55d0e547-a219-4a4f-a666-d95264c9d459"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.7-tble1-para1.2.2" guid="_81e0e495-0cef-462b-8529-fa8ce70d7933"><no>2.2</no><block><txt break.before="1">Prescribed tidal work not in a canal and for a non-private purpose is compatible with its location, having regard to the following—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.7-tble1-para1.2.2-para2.a" guid="_a183432d-5f36-46d6-80da-dfda2b17b7d9"><no>(a)</no><block><txt break.before="1">the character and amenity of the work’s immediate surroundings and the locality within which the work is located;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.7-tble1-para1.2.2-para2.b" guid="_b5afd8e9-7666-4e74-812f-60b4fc9d0b2c"><no>(b)</no><block><txt break.before="1">if the relevant planning scheme states the desired character or amenity for the work’s immediate surroundings or the locality within which the work is located—the stated desired character or amenity.</txt></block></tli></tlist></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.7-tble2" guid="_66e8bf02-9f01-43d2-8a5b-61b01c633c05"><block><txt break.before="1">The design and construction of the prescribed tidal work is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.7-tble2-para1.a" guid="_67a4a0ba-29b6-4e13-9b01-dc0ded613eb2"><no>(a)</no><block><txt break.before="1">subject to paragraph (c), prescribed tidal work used for a commercial purpose does not extend past the side boundary or extended side boundary of the lot connected to the work;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.7-tble2-para1.b" guid="_1c52c4fc-aa35-437f-af0f-c91d06a2db59"><no>(b)</no><block><txt break.before="1">subject to paragraph (c), prescribed tidal work used for a commercial purpose is not roofed unless it is the main access to land;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.7-tble2-para1.c" guid="_f761068b-ad39-4cc8-afd6-8e19fcb26f80"><no>(c)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a) or (b)—the relevant planning scheme standard, to the extent the standard is more stringent than the standard mentioned in paragraph (a) or (b);</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.7-tble2-para1.d" guid="_077c0d57-6c34-4038-9629-22617257533d"><no>(d)</no><block><txt break.before="1">any other relevant planning scheme standard that is not inconsistent with the standards mentioned in paragraphs (a) to (c).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.8" guid="_d3dc2405-2fdc-40bb-901e-0464f9a94be3"><entry namest="1" nameend="2" rowsep="1" align="center" valign="top" id="sch.4A-sec-tbl-tblr-oc.8-tble1" guid="_61a6ada0-5eac-4b54-aa77-b8cbd332c082"><block><txt break.before="1">Character and amenity (height, scale and size)</txt></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.9" guid="_4a68b411-8364-4b5f-bc74-d5ad1acf77ca"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.9-tble1" guid="_ee365825-2917-4c37-973d-37f6b1fabab2"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.9-tble1-para1.3.1" guid="_d1575246-e692-4942-abde-d17d7fe04330"><no>3.1</no><block><txt break.before="1">Prescribed tidal work is of a height, scale and size to ensure the work is compatible with the character and amenity of its location, having regard to the following—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.9-tble1-para1.3.1-para2.a" guid="_c81a991e-d50a-42be-8c19-987c9298f75d"><no>(a)</no><block><txt break.before="1">the height, scale and size of the natural features of the work’s immediate surroundings and the locality within which the work is located;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.9-tble1-para1.3.1-para2.b" guid="_b2825913-7651-4d81-a51d-493b8373a5a0"><no>(b)</no><block><txt break.before="1">the height, scale and size of the existing buildings or other structures in the work’s immediate surroundings and the locality within which the work is located;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.9-tble1-para1.3.1-para2.c" guid="_8e327ff2-d6e8-4891-98e0-a2ad0bf49a73"><no>(c)</no><block><txt break.before="1">if the relevant planning scheme states the desired height, scale or size of buildings or other structures in the work’s immediate surroundings or the locality within which the work is located—the stated desired height, scale or size.</txt></block></tli></tlist></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.9-tble2" guid="_3008545c-4d74-44a8-a41e-1522ea555794"><block><txt break.before="1">The height, scale and size of the prescribed tidal work is consistent with each relevant planning scheme standard.</txt></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.10" guid="_f3e761b3-9970-4edf-86a0-6d22f19ab983"><entry namest="1" nameend="2" rowsep="1" align="center" valign="top" id="sch.4A-sec-tbl-tblr-oc.10-tble1" guid="_6df123b2-236e-416d-9a4f-63f711a8984c"><block><txt break.before="1">Character and amenity (materials and colours)</txt></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.11" guid="_748143ca-2916-44c0-89c7-0426c06c42e0"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.11-tble1" guid="_a577d9fd-ea4d-4428-a862-b46356d48840"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.11-tble1-para1.4.1" guid="_4629b287-dacc-4301-a36f-8fd1b6b28697"><no>4.1</no><block><txt break.before="1">The materials used for, and the colours of, prescribed tidal work are compatible with the character and amenity of the work’s location, having regard to the following—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.11-tble1-para1.4.1-para2.a" guid="_631a2c90-05f5-452e-9a8e-1f96b629aadd"><no>(a)</no><block><txt break.before="1">the natural features of the work’s immediate surroundings and the locality within which the work is located;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.11-tble1-para1.4.1-para2.b" guid="_d230c6ee-9253-4e8f-b122-79c03cc95baa"><no>(b)</no><block><txt break.before="1">the existing buildings or other structures in the work’s immediate surroundings and the locality within which the work is located;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.11-tble1-para1.4.1-para2.c" guid="_dc345449-ec9b-4fde-bd19-e5dde8c954c1"><no>(c)</no><block><txt break.before="1">if the relevant planning scheme states the desired materials to be used for, or desired colours of, buildings or other structures in the work’s immediate surroundings or the locality within which the work is located—the stated desired materials or colours.</txt></block></tli></tlist></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.11-tble2" guid="_677f37e5-f738-433e-a0f6-ba4d355100a9"><block><txt break.before="1">The materials used for, and colours of, the prescribed tidal work are consistent with each relevant planning scheme standard.</txt></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.12" guid="_d9f7eafe-f893-4d55-9183-68c261938b37"><entry namest="1" nameend="2" rowsep="1" align="center" valign="top" id="sch.4A-sec-tbl-tblr-oc.12-tble1" guid="_7c780738-bbc1-49fb-9051-57953934a34b"><block><txt break.before="1">Lighting</txt></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.13" guid="_752436ae-477f-41a4-9e00-4cc2a98c83d1"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.13-tble1" guid="_3b310a36-1c08-48f4-b0d3-8dff61453cbb"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.13-tble1-para1.5.1" guid="_19bc4699-67a3-4e45-8dab-c6be2353738f"><no>5.1</no><block><txt break.before="1">Lighting, other than an aid to navigation, for prescribed tidal work is installed in a way to ensure the security and safe use of the work without causing significant adverse effects on the amenity of the locality within which the work is located.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.13-tble2" guid="_bfcee0b2-9ffc-400f-8ad2-00aa01bbdba3"><block><txt break.before="1">The lighting for the prescribed tidal work, other than an aid to navigation, is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.13-tble2-para1.a" guid="_2c30eabc-5f9f-4fb6-94c0-f1a728d8eecb"><no>(a)</no><block><txt break.before="1">subject to paragraph (c), lighting for prescribed tidal work is hooded and directed downwards;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.13-tble2-para1.b" guid="_3c69e944-b12f-4b0c-bf8b-e23d8c212982"><no>(b)</no><block><txt break.before="1">subject to paragraph (c), each lighting standard, to the extent relevant;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.13-tble2-para1.c" guid="_38c0aa78-8410-4173-809c-65791a249108"><no>(c)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a) or (b)—the relevant planning scheme standard, to the extent the standard is more stringent than the standard mentioned in paragraph (a) or (b);</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.13-tble2-para1.d" guid="_e11d1b9c-12fe-42f7-970d-1d894ce268dd"><no>(d)</no><block><txt break.before="1">any other relevant planning scheme standard that is not inconsistent with the standards mentioned in paragraphs (a) to (c).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.14" guid="_8c149fed-83f3-453c-9975-61cd9e5bab69"><entry namest="1" nameend="2" rowsep="1" align="center" valign="top" id="sch.4A-sec-tbl-tblr-oc.14-tble1" guid="_d09a00ab-0571-4b8b-86db-35f88a08f903"><block><txt break.before="1">Signage</txt></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.15" guid="_5fd51bcf-0628-4bc2-8785-00b8077ae848"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.15-tble1" guid="_05b8a2bf-635c-4f4c-aeee-b7167dece967"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.15-tble1-para1.6.1" guid="_fd7cd4ae-ecfb-47c6-a1ff-f51f8e456c56"><no>6.1</no><block><txt break.before="1">A sign erected or otherwise placed in position for prescribed tidal work, other than a sign erected or placed for safety reasons or under an Act—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.15-tble1-para1.6.1-para2.a" guid="_53a3789f-5b13-4717-be37-67749a706de3"><no>(a)</no><block><txt break.before="1">is compatible with the character and amenity of the work’s immediate surroundings and the locality within which the work is located; and</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.15-tble1-para1.6.1-para2.b" guid="_05992789-9227-4f23-b921-2160cd8d7b20"><no>(b)</no><block><txt break.before="1">is not a dominant feature of the work, unless the dominance is for safety reasons.</txt></block></tli></tlist></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.15-tble2" guid="_1e49ca4f-5d40-46ae-b988-c8d23ab9be5d"><block><txt break.before="1">A sign erected or otherwise placed in position for prescribed tidal work, other than a sign erected or placed for safety reasons or under an Act, is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.15-tble2-para1.a" guid="_fb4496d8-00fa-4e10-9397-a73ae9cd0f8c"><no>(a)</no><block><txt break.before="1">subject to paragraph (c), a sign erected or placed in position for identifying prescribed tidal work, or the owner of the work, is the only sign erected or placed in position for identifying the work or owner;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.15-tble2-para1.b" guid="_d89a1286-c755-4231-be75-c1068925c64f"><no>(b)</no><block><txt break.before="1">subject to paragraph (c), a sign erected or otherwise placed in position for prescribed tidal work is integrated into the design and construction of the work;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.15-tble2-para1.c" guid="_b9a5af4d-8956-4126-b4fb-2d181b320d42"><no>(c)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a);</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.15-tble2-para1.d" guid="_67191fc3-5ebb-4cbc-ada7-fcfb7d35e052"><no>(d)</no><block><txt break.before="1">any other relevant planning scheme standard that is not inconsistent with the standards mentioned in paragraphs (a), (b) and (c).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.16" guid="_2d8641b8-242a-4c1a-9082-bde308eb39d6"><entry namest="1" nameend="2" rowsep="1" align="center" valign="top" id="sch.4A-sec-tbl-tblr-oc.16-tble1" guid="_8c5f412f-067f-4a5c-88ab-6a4635d947cd"><block><txt break.before="1">Earthwork and vegetation</txt></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.17" guid="_c555e102-e4d3-4706-a72b-273d279ffb06"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.17-tble1" guid="_5aaa54b0-d33b-4451-a737-e903ca79bdfc"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.17-tble1-para1.7.1" guid="_15c542c4-54b9-4d43-975b-48d0df51165f"><no>7.1</no><block><txt break.before="1">Excavation and filling for prescribed tidal work—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.17-tble1-para1.7.1-para2.a" guid="_00c56cf5-aa3b-41e9-ab60-b46682c366f0"><no>(a)</no><block><txt break.before="1">is carried out only to the extent reasonably necessary for the work; and</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.17-tble1-para1.7.1-para2.b" guid="_bf956761-cd8a-4f44-be70-8efe76524c04"><no>(b)</no><block><txt break.before="1">does not have a significant adverse effect on—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.17-tble1-para1.7.1-para2.b-para3.i" guid="_7022cb27-6fd2-46f8-ab95-d49c378061fd"><no>(i)</no><block><txt break.before="1">the natural features of the tidal water under, within or over which the work is located; or</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.17-tble1-para1.7.1-para2.b-para3.i-para4.ii" guid="_f79eb9d2-c39e-465d-aebd-305e9e62a826"><no>(ii)</no><block><txt break.before="1">the level of the surface of the land under the tidal water under, within or over which the work is located, or any foreshores near the work.</txt></block></tli></tlist></block></tli></tlist></block></tli></tlist></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.17-tble2" guid="_206421a4-9bf8-48a1-b94e-ec9944b2bfc3"><block><txt break.before="1">The earthwork and filling for the prescribed tidal work is consistent with each relevant planning scheme standard.</txt></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.18" guid="_718570a3-e0ac-4bae-9d2b-ad9c6b239820"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.18-tble1" guid="_e2736ba5-7ab0-489b-b921-36987b37d872"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.18-tble1-para1.7.2" guid="_d5e1aabb-2199-4453-ac2d-0776cb4fcfdd"><no>7.2</no><block><txt break.before="1">The location of prescribed tidal work ensures vegetation is cleared or disturbed only to the extent reasonably necessary for the work.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.18-tble2" guid="_07b30989-c884-4a7e-b96f-2e1ffdaf148f"><block><txt break.before="1">The vegetation in the tidal water, under within or over which the prescribed tidal work is located, or on land under the tidal water, is cleared or disturbed in a way consistent with each relevant planning scheme standard.</txt></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.19" guid="_eeb869d9-9a09-4ada-a311-d2e4b3c1ed93"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.19-tble1" guid="_7cdbfa29-3736-4fb6-a30d-8d166d140614"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.19-tble1-para1.7.3" guid="_4d3af9b6-e4c4-4751-b506-ac78333cf9fb"><no>7.3</no><block><txt break.before="1">Any vegetation damaged, destroyed or removed by prescribed tidal work under, within or over tidal water other than an artificial waterway, is replaced with appropriate vegetation.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.19-tble2" guid="_d8df760a-47ce-4451-a883-948621012b39"><block><txt break.before="1">Vegetation affected by the prescribed tidal work is dealt with in a way consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.19-tble2-para1.a" guid="_2245a3c3-1950-45d6-86d4-f462ae6e7324"><no>(a)</no><block><txt break.before="1">subject to paragraph (b), vegetation damaged, destroyed or removed by prescribed tidal work is replaced with native vegetation for the locality within which the work is located, to the extent it is reasonably practicable to replace the vegetation with native vegetation;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.19-tble2-para1.b" guid="_bde02d11-2cc5-4d4b-bc64-ca6ff9fff53d"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a);</txt></block></tli></tlist><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.19-tble2-para1.c" guid="_9b1a9c72-3a6a-466a-b9fd-5e3b306ea6a7"><no>(c)</no><block><txt break.before="1">any other relevant planning scheme standard that is not inconsistent with the standards mentioned in paragraphs (a) and (b).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.20" guid="_81b57f54-31f1-4ba5-ab9b-29b2ebaf1633"><entry namest="1" nameend="2" rowsep="1" align="center" valign="top" id="sch.4A-sec-tbl-tblr-oc.20-tble1" guid="_6d264535-5ba0-4256-b027-98e8be4e24b8"><block><txt break.before="1">Public access—availability</txt></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.21" guid="_48668b3a-c829-4852-ba2c-0249ae502940"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.21-tble1" guid="_629dba46-0dc4-48e3-85da-64487786f435"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.21-tble1-para1.8.1" guid="_1d37968e-4028-4ad4-867f-7dd9aacf5f51"><no>8.1</no><block><txt break.before="1">Prescribed tidal work does not have a significant adverse effect on the availability of public access to foreshores, including public access proposed in the relevant planning scheme.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.21-tble2" guid="_eebee113-c539-4df9-841b-314138d4708f"><block><txt break.before="1">The design and construction of the prescribed tidal work is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.21-tble2-para1.a" guid="_fb085175-d8f4-4717-a628-11bf7f099c1b"><no>(a)</no><block><txt break.before="1">subject to paragraph (b), prescribed tidal work does not involve the erection or placement of any physical barrier preventing existing access, along a public accessway, to the foreshores near the work;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.21-tble2-para1.b" guid="_e891a402-8209-4dcb-97c7-1fc38d12bc9f"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a);</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.21-tble2-para1.c" guid="_fa481f3e-1184-4ad1-b4f6-98ce748204a0"><no>(c)</no><block><txt break.before="1">any other relevant planning scheme standard that is not inconsistent with the standards mentioned in paragraphs (a) and (b).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.22" guid="_fb9adac5-ac4a-4b1c-9b3c-15db14fd26dd"><entry namest="1" nameend="2" rowsep="1" align="center" valign="top" id="sch.4A-sec-tbl-tblr-oc.22-tble1" guid="_72fab911-8b3c-4c93-9830-7b8db64770b4"><block><txt break.before="1">Public access—safety</txt></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.23" guid="_f44a125b-ffda-4e64-9f3c-1fffb581d901"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.23-tble1" guid="_6f0bf142-cb2a-4af3-8eaf-aa5d408010af"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.23-tble1-para1.9.1" guid="_cff18d4d-34d0-461e-91f9-7f96f79cdd3e"><no>9.1</no><block><txt break.before="1">The location and design of prescribed tidal work does not adversely affect the safety of members of the public accessing the foreshores.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.23-tble2" guid="_1b01a7d6-c627-4d47-be76-dc6350a6bea8"><block><txt break.before="1">Public access to foreshores near the prescribed tidal work is consistent with each relevant planning scheme standard.</txt></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.24" guid="_3dfbd5eb-f961-4ec7-acd7-20ef623891e3"><entry namest="1" nameend="2" rowsep="1" align="center" valign="top" id="sch.4A-sec-tbl-tblr-oc.24-tble1" guid="_64cda2da-599b-44e6-8af0-6b77340f7afe"><block><txt break.before="1">Navigable access to, or egress from, non-tidal work lots</txt></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.25" guid="_5962b525-abbc-43da-aa28-c3e94dc5c424"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.25-tble1" guid="_e16bc86f-852b-45a6-95f5-c54a9feb6d11"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.25-tble1-para1.10.1" guid="_13d4832c-fe04-442a-887c-4a7844419de4"><no>10.1</no><block><txt break.before="1">Prescribed tidal work does not adversely affect navigable access to, or navigable egress from, any non-tidal work lot.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.25-tble2" guid="_e18a7c9a-87ab-480c-b293-6af04bf6e121"><block><txt break.before="1">The design and construction of the prescribed tidal work is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.25-tble2-para1.a" guid="_189c54af-1e97-498f-8a91-60c258c51c81"><no>(a)</no><block><txt break.before="1">subject to paragraph (b), if the lot connected to prescribed tidal work (the <defterm id="sch.4A-sec-tbl-tblr-oc.25-tble2-def.connectedlot" guid="_0fb65f22-1909-4a0f-8f3c-540c8efb596e" type="definition">connected lot</defterm>) adjoins a non-tidal work lot, the work does not extend past the connected lot’s side boundary, or extended side boundary, adjoining the non-tidal work lot;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.25-tble2-para1.b" guid="_697da2bb-6f75-4e50-8b13-e8b266467ce7"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.26" guid="_6aa6cf5a-9bba-4f27-bdd4-fef753fcb3bf"><entry namest="1" nameend="2" rowsep="1" align="center" valign="top" id="sch.4A-sec-tbl-tblr-oc.26-tble1" guid="_018bab9c-f149-48a1-a32a-209d242866c6"><block><txt break.before="1">Infrastructure, including, access, parking, sewerage and water services</txt></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.27" guid="_2065b792-4bf7-4554-a5b7-01a3a2676e54"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.27-tble1" guid="_d8724689-e379-4a80-9243-1d7fc48e1b08"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.27-tble1-para1.11.1" guid="_955c285c-be1f-43f6-be0c-662d18016e1f"><no>11.1</no><block><txt break.before="1">Prescribed tidal work has appropriate infrastructure, including, in particular, road access, parking facilities, sewerage services and water services, having regard to—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.27-tble1-para1.11.1-para2.a" guid="_51d3cfed-d7a1-41d2-9c35-bbcb9df5eec8"><no>(a)</no><block><txt break.before="1">the nature and scale of the work; and</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.27-tble1-para1.11.1-para2.b" guid="_3070fa1c-f0ee-4e37-961a-2b7ee782ba66"><no>(b)</no><block><txt break.before="1">the number of people that may be on or at the work at any time; and</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.27-tble1-para1.11.1-para2.c" guid="_d226c954-aa4c-4950-a93b-5ad3bddb3bbd"><no>(c)</no><block><txt break.before="1">the number of vehicles that may be on or moored at the work at any time; and</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.27-tble1-para1.11.1-para2.d" guid="_1b5ff861-2ff9-449b-a5d6-1300dddf34ef"><no>(d)</no><block><txt break.before="1">the protection of any foreshores near the work and the vegetation and marine plants on the foreshores.</txt></block></tli></tlist></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.27-tble2" guid="_ade8f1b8-d992-4fcb-8332-61d54b8202fa"><block><txt break.before="1">The infrastructure for prescribed tidal work is consistent with each relevant planning scheme standard.</txt></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.28" guid="_f3607dc3-4cbb-48ab-953b-a489518c89de"><entry namest="1" nameend="2" rowsep="1" align="center" valign="top" id="sch.4A-sec-tbl-tblr-oc.28-tble1" guid="_38dfed57-72b8-4a4d-a2a2-1ee9d910021e"><block><txt break.before="1">Design, construction and safety—all prescribed tidal work</txt></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.29" guid="_4561ba03-0320-4b55-a11a-3eb793cb6445"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.29-tble1" guid="_d3c1d405-dd2a-4d72-996f-62f5f444c80f"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.29-tble1-para1.12.1" guid="_680efcc0-768b-4f86-9ea1-ff3c21997162"><no>12.1</no><block><txt break.before="1">Prescribed tidal work is designed and constructed in a way to ensure it is structurally sound, having regard to the following—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.29-tble1-para1.12.1-para2.a" guid="_b4886cf0-a893-45f7-8339-70c53226d915"><no>(a)</no><block><txt break.before="1">relevant engineering standards;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.29-tble1-para1.12.1-para2.b" guid="_de966624-a619-4c04-83a3-972f8655f7cb"><no>(b)</no><block><txt break.before="1">the location of the work;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.29-tble1-para1.12.1-para2.c" guid="_9b851056-9957-41b2-a7f9-a96f6066d58c"><no>(c)</no><block><txt break.before="1">the purpose for which the work is to be used;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.29-tble1-para1.12.1-para2.d" guid="_a3202de3-a294-487a-a673-03ba76f31b07"><no>(d)</no><block><txt break.before="1">the impact of flooding, tidal influences and hydrodynamic changes.</txt></block></tli></tlist></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.29-tble2" guid="_b3e7d923-365f-4b67-bc99-e66c77f81433"><block><txt break.before="1">The design and construction of the prescribed tidal work is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.29-tble2-para1.a" guid="_c8e93fd5-ceea-4983-a941-d5da4cb0c16f"><no>(a)</no><block><txt break.before="1">subject to paragraph (b), each Australian Standard relevant to the design or construction of structures, to the extent requirements stated in the Standard apply to the design or construction of prescribed tidal work;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.29-tble2-para1.b" guid="_eb35da76-c9cc-43a8-97e0-b8dcdf5436ca"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than any standard mentioned in paragraph (a)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.30" guid="_65ac2db8-0bf7-49e1-ab90-36b17c03e171"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.30-tble1" guid="_dc1e8347-793a-417c-b92d-82e217871168"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.30-tble1-para1.12.2" guid="_21abdb39-d7d5-4e44-bfa6-acd2c320cb36"><no>12.2</no><block><txt break.before="1">Prescribed tidal work does not adversely affect the structural integrity of any existing revetment or seawall or another existing structure.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.30-tble2" guid="_0b66c41b-f814-4b9f-97e0-29e253bf25cb"><block><txt break.before="1">The design and construction of the prescribed tidal work is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.30-tble2-para1.a" guid="_32de503c-4a0e-40fa-bb6f-c12cd7152da7"><no>(a)</no><block><txt break.before="1">subject to paragraph (b), prescribed tidal work, including any shore abutment, piling or other structure connected with the work—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.30-tble2-para1.a-para2.i" guid="_2217065e-412b-414d-ae84-1cf6c63ead69"><no>(i)</no><block><txt break.before="1">does not place an additional load on any existing revetment or seawall or another existing structure; or</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.30-tble2-para1.a-para2.ii" guid="_3110856a-e86e-4b07-9fea-c95ba36e51e3"><no>(ii)</no><block><txt break.before="1">can be structurally supported by an existing revetment or seawall or another existing structure;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.30-tble2-para1.b" guid="_0a14acfe-4dda-453a-abb4-b87730ecf001"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.31" guid="_5eef17a7-7566-419a-8044-df3e4dd9b034"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.31-tble1" guid="_e9d1f9dc-617d-4780-9d1b-f07620e7714f"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.31-tble1-para1.12.3" guid="_2abefaa9-352a-4720-b8dc-9a7efd055c32"><no>12.3</no><block><txt break.before="1">Prescribed tidal work is designed and constructed in a way to ensure it does not adversely affect the stability of the bed and banks of any tidal water.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.31-tble2" guid="_5dc32020-d1ce-4ba3-811d-124dc94ed420"><block><txt break.before="1">The design and construction of the prescribed tidal work is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.31-tble2-para1.a" guid="_00039f25-ca5a-496a-a923-81918767bd94"><no>(a)</no><block><txt break.before="1">subject to paragraph (b), prescribed tidal work does not cause, by changing the flow of water, the removal of, or disturbance to, the sediment on the bed and banks of any tidal water;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.31-tble2-para1.b" guid="_c1a4bcfe-4907-4bca-8790-220e985f53c3"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.32" guid="_baebdab5-0fa4-4175-9937-8467d7b7e610"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.32-tble1" guid="_58066153-0fe1-42b5-95b0-cea89fd4f10e"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.32-tble1-para1.12.4" guid="_de9c1a75-d6aa-4f44-9c12-81dace11c6be"><no>12.4</no><block><txt break.before="1">Prescribed tidal work is designed and constructed using materials having a long life in marine environments, having regard to their ability to resist the following—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.32-tble1-para1.12.4-para2.a" guid="_d3c8c854-5277-4230-9242-bc72f69f59d8"><no>(a)</no><block><txt break.before="1">attack by marine organisms;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.32-tble1-para1.12.4-para2.b" guid="_859011f3-d63e-407a-8ebd-fd7165bd4cb9"><no>(b)</no><block><txt break.before="1">corrosion;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.32-tble1-para1.12.4-para2.c" guid="_5f3f04b3-1289-4894-bd15-e7668f0c0116"><no>(c)</no><block><txt break.before="1">deterioration resulting from abrasion or immersion in seawater.</txt></block></tli></tlist></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.32-tble2" guid="_05e2e3c5-15a2-4015-bf7e-e6cbfb416ce2"><block><txt break.before="1">The design and construction of the prescribed tidal work is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.32-tble2-para1.a" guid="_a35d7f75-318a-4602-81bb-d8f1d1ec66e2"><no>(a)</no><block><txt break.before="1">subject to paragraph (b), each Australian Standard relevant to the materials that should be used, or the measures that should be taken to treat materials used, for structures, to the extent the requirements stated in the Standard apply to structures located in a marine environment;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.32-tble2-para1.b" guid="_d6eef39e-978b-442f-a5d7-f7d45e704691"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.33" guid="_2c60e3e9-9d38-4907-8efd-9cfa47fcee6c"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.33-tble1" guid="_8413cc05-55cd-448c-bace-954c06ffc242"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.33-tble1-para1.12.5" guid="_05db1dcb-1c34-4587-a515-7616fdcf955e"><no>12.5</no><block><txt break.before="1">Prescribed tidal work is designed and constructed in a way to ensure it does not adversely affect the operation or maintenance of any existing stormwater outlet.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.33-tble2" guid="_a9d0c0ea-c812-48ae-8700-96c2d47a646f"><block><txt break.before="1">The design and construction of the prescribed tidal work is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.33-tble2-para1.a" guid="_b701721d-b6a7-4134-bb48-9fef805f4ff6"><no>(a)</no><block><txt break.before="1">subject to paragraph (c), vessels moored at prescribed tidal work do not impede the discharge of stormwater;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.33-tble2-para1.b" guid="_bc08ac5f-7ff8-4449-b51d-a57f9dedbc1d"><no>(b)</no><block><txt break.before="1">subject to paragraph (c), prescribed tidal work does not restrict access to any stormwater outlet;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.33-tble2-para1.c" guid="_87243295-b3e8-403a-b897-54080b1da6cc"><no>(c)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a) or (b)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a) or (b).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.34" guid="_ca06a962-4ade-4f7a-8149-c4f68229f6b0"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.34-tble1" guid="_aec56dab-7355-4aa6-b858-cb4fe3e06bc5"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.34-tble1-para1.12.6" guid="_37685841-3641-4929-b56c-bbf7dfc44f8b"><no>12.6</no><block><txt break.before="1">Prescribed tidal work is designed and constructed in a way to ensure it does not adversely affect the water quality of any tidal water, including, in particular, as a result of—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.34-tble1-para1.12.6-para2.a" guid="_4996b6e9-08b3-4631-89af-2844c6f433ae"><no>(a)</no><block><txt break.before="1">release, into the tidal water, of materials used in the construction of the work; or</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.34-tble1-para1.12.6-para2.b" guid="_e1d97cbc-e45d-41e7-8d59-603389ba027d"><no>(b)</no><block><txt break.before="1">disturbance to the sediment on the bed and banks of the tidal water; or</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.34-tble1-para1.12.6-para2.c" guid="_36ebd2c0-73c2-4b2c-b3ff-bf1500b015cd"><no>(c)</no><block><txt break.before="1">exposure to acid sulphate soils.</txt></block></tli></tlist></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.34-tble2" guid="_1b19715d-973a-41c0-b681-f365a0f3a350"><block><txt break.before="1">The design and construction of the prescribed tidal work is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.34-tble2-para1.a" guid="_eb1adc38-5890-4c0e-ab09-dacd7bf8c29a"><no>(a)</no><block><txt break.before="1">subject to paragraph (b), each Australian Standard relevant to the design or construction of structures under, within or over tidal water, to the extent the requirements stated in the Standard are directed at maintaining the water quality of tidal water;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.34-tble2-para1.b" guid="_428546a8-33ac-4a03-a8c4-f8604903c288"><no>(b)</no><block><txt break.before="1">subject to paragraph (b), each Australian Standard relevant to the design or construction of structures under, within or over tidal water, to the extent the requirements stated in the Standard are directed at maintaining the water quality of tidal water;</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.35" guid="_615163d7-0ee0-4bff-baec-bd2361189ac2"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.35-tble1" guid="_cb15fd67-2d46-4861-a73c-37bf218c4a2a"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.35-tble1-para1.12.7" guid="_b5a3e252-b9ce-4205-bdd5-419f0200c6c9"><no>12.7</no><block><txt break.before="1">Prescribed tidal work is designed and constructed in a way to ensure it is safe for persons standing or walking on the work.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.35-tble2" guid="_e19f8af3-3e35-4e9b-98f4-e4a488f88503"><block><txt break.before="1">The design and construction of the prescribed tidal work is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.35-tble2-para1.a" guid="_70691396-1cc8-4ad1-9e2c-d8c8c97e0b62"><no>(a)</no><block><txt break.before="1">subject to paragraph (c), any surface of prescribed tidal work on which a person may stand or walk is—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.35-tble2-para1.a-para2.i" guid="_af23e5a1-a280-42da-bbc2-f6a4133ae91b"><no>(i)</no><block><txt break.before="1">not slippery; and</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.35-tble2-para1.a-para2.ii" guid="_38c517ba-0b9f-4e11-ac25-b38f06cc4b9d"><no>(ii)</no><block><txt break.before="1">does not have any feature that may cause the person to trip or fall;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.35-tble2-para1.b" guid="_93e64744-28e1-47bf-a506-0354388b458d"><no>(b)</no><block><txt break.before="1">subject to paragraph (c), any part of prescribed tidal work that is unsafe for persons standing or walking on the work is surrounded by adequate barriers to deter persons from entering the part;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.35-tble2-para1.c" guid="_45ce5cef-2dc4-4eb1-b40b-4484e8b1a8c8"><no>(c)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a) or (b)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a) or (b).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.36" guid="_1a1c7dfe-8f25-49a1-8fab-53d3c5a85440"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.36-tble1" guid="_1e8f413e-f12b-4a22-8b4e-79d22f9455c3"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.36-tble1-para1.12.8" guid="_98730fce-a825-47de-a5e6-c966a2db9ae5"><no>12.8</no><block><txt break.before="1">Appropriate measures are taken for prescribed tidal work for a non-private purpose to ensure an unsupportable live load is not applied to the work by persons or vehicles.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.36-tble2" guid="_519978d8-ca4e-47b9-8582-f24e5b1c31dd"><block><txt break.before="1">The design and construction of the prescribed tidal work is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.36-tble2-para1.a" guid="_695a06d0-01df-4b0a-b875-2df6df6b109f"><no>(a)</no><block><txt break.before="1">subject to paragraph (b), prescribed tidal work has erected or placed in position on or near the work, a sign that—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.36-tble2-para1.a-para2.i" guid="_5557de49-fc9a-468c-8a9b-5b60b5217b51"><no>(i)</no><block><txt break.before="1">is visible at all times; and</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.36-tble2-para1.a-para2.ii" guid="_d009303d-cc7f-4f40-9952-12f6ca8d04ec"><no>(ii)</no><block><txt break.before="1">states the maximum live load that may be applied to the work, in terms of the maximum number of persons that may be on the work at any given time or the maximum number of vehicles of a particular type that may be on or moored at the work at any given time;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.36-tble2-para1.b" guid="_d0d198e8-3ec7-4cd1-b8ba-bf32b86081d2"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.37" guid="_04283df2-b907-46a7-ad50-f8c518f61eb2"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.37-tble1" guid="_4518e901-124a-4d69-85ca-266643c97c12"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.37-tble1-para1.12.9" guid="_b0df7c2f-393f-41b3-a90d-8df8a3fa35e7"><no>12.9</no><block><txt break.before="1">Prescribed tidal work, other than a boardwalk or an independent deck for a private purpose, is designed and constructed in a way that ensures the use of tidal water in a canal for a non-maritime purpose is minimised.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.37-tble2" guid="_36340009-e3f0-42f8-ace7-2f490ffce3d4"><block><txt break.before="1">The design and construction of the prescribed tidal work is consistent with each relevant planning scheme standard.</txt></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.38" guid="_5bfc6a17-24ac-43fd-9d0b-782b883766a1"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.38-tble1" guid="_4e3e5b8c-c101-452f-b5d9-f304d95b0e06"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.38-tble1-para1.12.10" guid="_6dcb9624-0d81-4494-8873-d40f7807bca2"><no>12.10</no><block><txt break.before="1">Prescribed tidal work that is a boardwalk or an independent deck and for a private purpose, is designed and constructed in a way that ensures the use of tidal water in a canal for a non-maritime purpose is minimised.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.38-tble2" guid="_a1fb9697-9cf3-4f78-b4bf-94f3ceb2a01c"><block><txt break.before="1">(s 6(2) solution)</txt></block><block><txt break.before="1">The design and construction of the boardwalk or deck is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.38-tble2-para1.a" guid="_d2691889-1f9e-4f8b-a865-b1d5327ad629"><no>(a)</no><block><txt break.before="1">subject to paragraph (c), a boardwalk or independent deck does not extend more than 3m from the waterfront boundary of the lot connected to the boardwalk or deck;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.38-tble2-para1.b" guid="_09bfdd02-bb42-4673-8996-059cd38bfacb"><no>(b)</no><block><txt break.before="1">subject to paragraph (c), a boardwalk or independent deck is at least 3m inside of the side boundary or extended side boundary of the lot connected to the boardwalk or deck;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.38-tble2-para1.c" guid="_bb8a7752-d41c-479d-89bd-6b6a0c506a6b"><no>(c)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a) or (b)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a) or (b).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.39" guid="_1cad129c-af07-4b09-bc62-4f7a2dc17c8d"><entry namest="1" nameend="2" rowsep="1" align="center" valign="top" id="sch.4A-sec-tbl-tblr-oc.39-tble1" guid="_1242742f-e599-42aa-b14f-7827695dc7cc"><block><txt break.before="1">Design, construction and safety—boat ramps and slip ways for private purpose</txt></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.40" guid="_77bd8d73-fd5b-496a-a667-a2071ab2ee47"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.40-tble1" guid="_73bbd9e6-d5e8-4904-8111-ab2f0c2ffdc1"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.40-tble1-para1.13.1" guid="_287320c1-e2b4-44ab-9e59-17c46b08e719"><no>13.1</no><block><txt break.before="1">Prescribed tidal work that is a private boat ramp or private slip way is designed and constructed in a way to ensure it is structurally sound while also ensuring the top of each wall at the edge of the boat ramp or slip way is level with the surface of the land on which the boat ramp or slip way is located.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.40-tble2" guid="_cd52077c-85ce-4b17-82ea-fa14bf615065"><block><txt break.before="1">(s 6(2) solution)</txt></block><block><txt break.before="1">The design and construction of the boat ramp or slip way is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.40-tble2-para1.a" guid="_a7d83e4f-29b9-4836-8f16-a2605f76489d"><no>(a)</no><block><txt break.before="1">subject to paragraph (c), the walls at the edge of a boat ramp or slip way penetrate into the earth at least 600mm below the surface of the land on which the boat ramp or slip way is located;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.40-tble2-para1.b" guid="_f3c305cc-dc5b-45ed-9571-8b4ce14618b8"><no>(b)</no><block><txt break.before="1">subject to paragraph (c), the surface of a boat ramp or slip way is no more than 200mm above the surface of the land on which it is located;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.40-tble2-para1.c" guid="_39be4ef6-5a06-4e81-b493-28d7f914f470"><no>(c)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a) or (b)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a) or (b).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.41" guid="_61414645-82a3-4513-a07a-097de5c2ad20"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.41-tble1" guid="_156a1e38-a790-4909-bbd4-6d567342b661"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.41-tble1-para1.13.2" guid="_0854ce05-4b77-4c50-8419-d13fe1dc7dde"><no>13.2</no><block><txt break.before="1">Prescribed tidal work that is a private boat ramp or private slip way is designed and constructed in a way to ensure the safe movement of vehicles or persons over the boat ramp or slip way.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.41-tble2" guid="_ee2a0d33-2cb2-41ed-a261-95376490ccc6"><block><txt break.before="1">(s 6(2) solution)</txt></block><block><txt break.before="1">The design and construction of the boat ramp or slip way is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.41-tble2-para1.a" guid="_e9bc4382-69d4-4055-945b-14e5f6b505a4"><no>(a)</no><block><txt break.before="1">subject to paragraph (d), the upper surface of a boat ramp or slip way has a width of no less than 3.6m;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.41-tble2-para1.b" guid="_423e028e-902a-4293-872a-19477389697a"><no>(b)</no><block><txt break.before="1">subject to paragraph (d), the whole upper surface of a boat ramp or slip way is treated to prevent it from becoming slippery by using any of the following methods—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.41-tble2-para1.b-para2.i" guid="_0417f257-d98f-4263-9d4d-318ccc607773"><no>(i)</no><block><txt break.before="1">forming grooves over the surface, as close as possible to 40mm wide, 20mm deep and 150mm apart, and at an angle as close as possible to 70&#176; to the centre-line of the boat ramp or slip way;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.41-tble2-para1.b-para2.ii" guid="_97cde3d4-c3d7-4dd3-aa4b-fcb67f0b6158"><no>(ii)</no><block><txt break.before="1">covering the surface with a substance ordinarily used on slippery surfaces to prevent skidding;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.41-tble2-para1.b-para2.iii" guid="_1dce2812-b959-4e87-b947-b3c43159ff48"><no>(iii)</no><block><txt break.before="1">making, through a physical act, the surface coarse before it sets, including, for example, by raking the surface;</txt></block></tli></tlist></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.42" guid="_bf424e5f-89d1-43e8-8e85-f8e02f36fecd"><entry colname="1" colsep="1" rowsep="1" id="sch.4A-sec-tbl-tblr-oc.42-tble1" guid="_6f583d37-d511-4fa1-9632-8fa1c538545b"/><entry colname="2" rowsep="1" id="sch.4A-sec-tbl-tblr-oc.42-tble2" guid="_1c976f45-6a7f-4cfc-baa1-7a271b5bd39f"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.42-tble2-para1.c" guid="_46e8c1e3-091b-4754-90d1-8bf7e8ec9623"><no>(c)</no><block><txt break.before="1">subject to paragraph (d), the upper surface of a boat ramp or slip way for which a winch is not used to hoist or haul vessels onto the boat ramp or slip way is at a gradient of not steeper than—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.42-tble2-para1.c-para2.i" guid="_bbd26a5a-416e-4bf3-ad29-4ecd15372b5f"><no>(i)</no><block><txt break.before="1">if the surface is treated by using a method mentioned in paragraph (b)(i) or (ii)—1:8; or</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.42-tble2-para1.c-para2.ii" guid="_2a557657-e2f4-417f-a92f-b14cfbdf2f6a"><no>(ii)</no><block><txt break.before="1">otherwise—1:10;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.42-tble2-para1.d" guid="_f924aa49-bc09-41ed-96ac-998de92d08c4"><no>(d)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a), (b) or (c)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a), (b) or (c).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.43" guid="_971ba086-adb6-453b-814c-1e91a8e2bef7"><entry namest="1" nameend="2" rowsep="1" align="center" valign="top" id="sch.4A-sec-tbl-tblr-oc.43-tble1" guid="_86583f7f-4fed-4380-be45-790cca5cf0fd"><block><txt break.before="1">Design, construction and safety—bridges</txt></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.44" guid="_df9af2aa-7865-445f-b290-cb263e4e7e8c"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.44-tble1" guid="_bb05fee7-d43e-4c56-89a8-21c24a9623c3"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.44-tble1-para1.14.1" guid="_3e5796c0-1432-41ed-bd51-12316028e45b"><no>14.1</no><block><txt break.before="1">Prescribed tidal work that is a bridge does not adversely affect existing public use of any tidal water, including, for example, use of the tidal water for canoeing, swimming or other recreational activities.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.44-tble2" guid="_1bb21aa8-4c36-416f-8531-943ec518624c"><block><txt break.before="1">The design and construction of the bridge, including any abutment connected with the bridge, is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.44-tble2-para1.a" guid="_22c64a9a-2b59-46bb-bf62-108458337420"><no>(a)</no><block><txt break.before="1">subject to paragraph (b), the clearance levels under a bridge are high enough to allow continued public use of any tidal water over which it is constructed;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.44-tble2-para1.b" guid="_681febab-886c-4dd5-83aa-908e03915af8"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.45" guid="_c1d1db94-5a59-44d2-a4f0-40595706c4f8"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.45-tble1" guid="_4c2f3769-7513-485d-9916-9873eb81f8a2"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.45-tble1-para1.14.2" guid="_7686455f-078d-40ff-827a-13df7fb15905"><no>14.2</no><block><txt break.before="1">Prescribed tidal work that is a bridge does not adversely affect the flow of tidal water under the bridge.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.45-tble2" guid="_a218045b-bf1f-435a-bf08-ae5cd96b7fb5"><block><txt break.before="1">The design and construction of the bridge is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.45-tble2-para1.a" guid="_6bb96d64-0a2e-480e-b545-4437927d8b07"><no>(a)</no><block><txt break.before="1">subject to paragraph (b)—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.45-tble2-para1.a-para2.i" guid="_6135c152-b55e-419a-aefa-7caa7fcb18e4"><no>(i)</no><block><txt break.before="1">if a bridge can be adequately supported without erecting or placing a foundation support in tidal water—no foundation support to support the bridge is erected or placed in the tidal water; or</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.45-tble2-para1.a-para2.ii" guid="_f18891c5-b5ed-4094-b9b1-90823bb85273"><no>(ii)</no><block><txt break.before="1">otherwise—only the minimum number of foundation supports required to support the bridge is used;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.45-tble2-para1.b" guid="_c3b46279-eb44-42cd-9ec2-26b98e2eeb1d"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.46" guid="_41d4e2ff-963d-4da3-8c5d-2de506102caf"><entry namest="1" nameend="2" rowsep="1" align="center" valign="top" id="sch.4A-sec-tbl-tblr-oc.46-tble1" guid="_f7332a2d-d2a4-4b7b-a36c-80b0970bbf76"><block><txt break.before="1">Design, construction and safety—boardwalks and independent decks</txt></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.47" guid="_6695fe7d-679a-4265-a9be-5543bc5ce3e4"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.47-tble1" guid="_4e0568d2-bee8-40a0-9253-58d1271a5d81"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.47-tble1-para1.15.1" guid="_9b75088a-0169-4adb-9913-11d411422f10"><no>15.1</no><block><txt break.before="1">Prescribed tidal work that is a boardwalk or an independent deck and for a private purpose is designed and constructed in a way to ensure it is able to support its intended loads, having regard to its relevant loading matters.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.47-tble2" guid="_c7ff962a-a203-4c62-b8a1-6464e86b0382"><block><txt break.before="1">(s 6(2) solution)</txt></block><block><txt break.before="1">The design and construction of the boardwalk or deck is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.47-tble2-para1.a" guid="_0cc094db-55a6-47e6-83f3-9bb661d693ba"><no>(a)</no><block><txt break.before="1">subject to paragraph (d), a boardwalk or independent deck accessible to vehicular traffic is able to support at least a live load of 3.0kPa plus an axle load of 10kN;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.47-tble2-para1.b" guid="_5f5d3e8f-f6b6-4296-8626-9a7000159490"><no>(b)</no><block><txt break.before="1">subject to paragraph (d), a boardwalk or independent deck that is not accessible to vehicular traffic and that is for individual use is able to support at least a live load of 2.0kPa;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.47-tble2-para1.c" guid="_545f82bb-8ba8-4a52-8b2d-726f04cc88a1"><no>(c)</no><block><txt break.before="1">subject to paragraph (d), a boardwalk or independent deck that is not accessible to vehicular traffic and that is for group use is able to support at least a live load of 3.0kPa;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.47-tble2-para1.d" guid="_8b41db34-a4dc-43a2-b5ce-5103dd54f048"><no>(d)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a), (b) or (c)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a), (b) or (c).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.48" guid="_ae4d5981-1388-4d86-98d5-e45597c10771"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.48-tble1" guid="_6e4ef495-3082-4a14-8ca0-b6aafbfa1c70"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.48-tble1-para1.15.2" guid="_5c6e0588-405f-4535-98bf-aef0294e98e7"><no>15.2</no><block><txt break.before="1">Prescribed tidal work that is a boardwalk or an independent deck and for a non-private purpose is designed and constructed in a way to ensure it is able to support its intended loads, having regard to its relevant loading matters.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.48-tble2" guid="_5e7c629c-ce51-41e4-857e-ef841f884156"><block><txt break.before="1">(s 6(2) solution)</txt></block><block><txt break.before="1">The design or construction of the boardwalk or deck is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.48-tble2-para1.a" guid="_c82ae7e0-157f-4e57-80c7-d4f484b5a849"><no>(a)</no><block><txt break.before="1">subject to paragraph (c), a boardwalk or independent deck accessible to vehicular traffic is able to support at least the following—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.48-tble2-para1.a-para2.i" guid="_4264984c-5f9b-4716-89a6-3f3c565541bf"><no>(i)</no><block><txt break.before="1">a distributed live load of 5.0kPa;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.48-tble2-para1.a-para2.ii" guid="_b2efd5df-7fa0-43ae-b779-3b9617f8cee6"><no>(ii)</no><block><txt break.before="1">a concentrated live load of 4.5kN;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.48-tble2-para1.a-para2.iii" guid="_71a522c1-6882-4ff4-b62c-c85456e1e599"><no>(iii)</no><block><txt break.before="1">the load of the largest vehicle capable of being on the boardwalk or deck;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.48-tble2-para1.b" guid="_9f8c7d64-9fae-40de-9359-1031ef4aa922"><no>(b)</no><block><txt break.before="1">subject to paragraph (c), a boardwalk or independent deck not accessible to vehicular traffic is able to support at least the following—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.48-tble2-para1.b-para2.i" guid="_f2888858-18d7-4eea-ab25-367e50f3cca7"><no>(i)</no><block><txt break.before="1">a distributed live load of 5.0kPa;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.48-tble2-para1.b-para2.ii" guid="_41fcfc9d-5a92-4dba-8a20-efb85dcbb4d9"><no>(ii)</no><block><txt break.before="1">a concentrated live load of 4.5kN;</txt></block></tli></tlist></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.49" guid="_dd8ccc39-617f-4059-934b-4ff6d62071d9"><entry colname="1" colsep="1" rowsep="1" id="sch.4A-sec-tbl-tblr-oc.49-tble1" guid="_32678e3d-5f0e-414d-b127-ce61a5fe8209"/><entry colname="2" rowsep="1" id="sch.4A-sec-tbl-tblr-oc.49-tble2" guid="_90c492d6-b8fa-44d4-b712-01d0ea55c16b"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.49-tble2-para1.c" guid="_a526e6c6-8809-40e1-be0a-fa24dcd754c5"><no>(c)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a) or (b)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a) or (b).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.50" guid="_16c587d3-e8c9-4f2f-9fa7-ccb67a559d76"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.50-tble1" guid="_e4d313be-012f-4bcc-b500-0a223fb53a68"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.50-tble1-para1.15.3" guid="_db0298c2-ef08-4bdd-99f3-3adb979c1450"><no>15.3</no><block><txt break.before="1">Prescribed tidal work that is a boardwalk or an independent deck does not prevent or hinder remedial work being undertaken on any bank of tidal water or for any existing retaining wall, revetment or seawall or another existing structure.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.50-tble2" guid="_cc063775-5ec1-429c-9b24-edb045c70943"><block><txt break.before="1">The design and construction of the boardwalk or deck is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.50-tble2-para1.a" guid="_3d3871e6-e0d4-4657-be9a-a37801c9dca2"><no>(a)</no><block><txt break.before="1">subject to paragraph (b), a boardwalk or independent deck either—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.50-tble2-para1.a-para2.i" guid="_71f0022b-6d18-464d-8319-0603702bc3e7"><no>(i)</no><block><txt break.before="1">can be easily dismantled and reassembled; or</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.50-tble2-para1.a-para2.ii" guid="_8db4b592-aa11-41fb-bbca-580f64eaa519"><no>(ii)</no><block><txt break.before="1">does not restrict the movement of machinery ordinarily used for remedial work to any bank of tidal water or any existing retaining wall, revetment or seawall or other existing structure;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.50-tble2-para1.b" guid="_fd42cbc9-f8b2-488d-9a97-7cff9096fe8c"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.51" guid="_942920c3-7929-4e1a-be90-be677c77bccb"><entry namest="1" nameend="2" rowsep="1" align="center" valign="top" id="sch.4A-sec-tbl-tblr-oc.51-tble1" guid="_9312e0f5-cea2-44c2-af85-ae70ab441202"><block><txt break.before="1">Design, construction and safety—jetties and piers</txt></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.52" guid="_be38b712-556c-4bf7-a7e9-00fe50b8a0f9"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.52-tble1" guid="_e897bc23-53ef-4ca8-9b06-5cc1f2a8041c"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.52-tble1-para1.16.1" guid="_9a002156-7697-45e2-bf23-6cbbac1230b4"><no>16.1</no><block><txt break.before="1">Prescribed tidal work that is a jetty or pier and for a private purpose is designed and constructed in a way to ensure it is able to support its intended loads, having regard to its relevant loading matters.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.52-tble2" guid="_0ca13cf8-1170-4e8a-ba6c-37da38b45e74"><block><txt break.before="1">(s 6(2) solution)</txt></block><block><txt break.before="1">The design and construction of the jetty or pier is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.52-tble2-para1.a" guid="_3636c726-fc31-4453-a978-3303fe8fa76f"><no>(a)</no><block><txt break.before="1">subject to paragraph (d), a jetty or pier accessible to vehicular traffic is able to support at least a live load of 3.0kPa plus an axle load of 10kN;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.52-tble2-para1.b" guid="_65f17583-040e-47c7-b81c-3d94044de70c"><no>(b)</no><block><txt break.before="1">subject to paragraph (d), a jetty or pier that is not accessible to vehicular traffic and that is for individual use is able to support at least a live load of 2.0kPa;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.52-tble2-para1.c" guid="_40065050-d4cb-44ed-8ce9-1515c724cf3c"><no>(c)</no><block><txt break.before="1">subject to paragraph (d), a jetty or pier that is not accessible to vehicular traffic and that is for group use is able to support at least a live load of 3.0kPa;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.52-tble2-para1.d" guid="_46eb835b-b9a9-4008-b1e7-49530217a4c7"><no>(d)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a), (b) or (c)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a), (b) or (c).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.53" guid="_7f9b568c-b3c2-4245-a7f1-aeeab49c3a82"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.53-tble1" guid="_9ada985d-fba5-4318-af09-527ccdf2a4ce"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.53-tble1-para1.16.2" guid="_90ce3833-05db-4895-a007-e104d4c18b10"><no>16.2</no><block><txt break.before="1">Prescribed tidal work that is a jetty or pier and for a non-private purpose is designed and constructed in a way to ensure it is able to support its intended loads, having regard to its relevant loading matters.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.53-tble2" guid="_bb2f0e03-c4df-4e2f-a18f-62c1e2b91b50"><block><txt break.before="1">(s 6(2) solution)</txt></block><block><txt break.before="1">The design and construction of the jetty or pier is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.53-tble2-para1.a" guid="_e2833070-312c-4764-bb1b-6e8db1cae3be"><no>(a)</no><block><txt break.before="1">subject to paragraph (c), a jetty or pier accessible to vehicular traffic is able to support at least the following—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.53-tble2-para1.a-para2.i" guid="_84281376-9857-42ba-8c27-ae799c4359a7"><no>(i)</no><block><txt break.before="1">a distributed live load of 5.0kPa;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.53-tble2-para1.a-para2.ii" guid="_591ad80e-591b-42f8-b268-a1889ea3f671"><no>(ii)</no><block><txt break.before="1">a concentrated live load of 4.5kN;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.53-tble2-para1.a-para2.iii" guid="_73f78d7a-0141-4004-8f1d-165b6170c57f"><no>(iii)</no><block><txt break.before="1">the load of the largest vehicle capable of being on or moored at the jetty or pier;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.53-tble2-para1.b" guid="_55f51273-f385-4029-ad27-b99bb60c0915"><no>(b)</no><block><txt break.before="1">subject to paragraph (c), a jetty or pier not accessible to vehicular traffic is able to support at least the following—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.53-tble2-para1.b-para2.i" guid="_dc6c07e2-e322-461a-9d1e-4bfb12631376"><no>(i)</no><block><txt break.before="1">a distributed live load of 5.0kPa;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.53-tble2-para1.b-para2.ii" guid="_1b3d06f4-5085-4ec7-a96e-89049adeb9d1"><no>(ii)</no><block><txt break.before="1">a concentrated live load of 4.5kN;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.53-tble2-para1.c" guid="_31daa01d-5c5d-4a6c-8285-b22d50d874cb"><no>(c)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a) or (b)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a) or (b).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.54" guid="_6afde4cc-4e6b-473b-94d4-67fa99f5d9cb"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.54-tble1" guid="_c4bbe9b6-902b-45f8-8c77-2f470d8cd714"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.54-tble1-para1.16.3" guid="_56b74deb-2ca9-4c7a-9cbf-3fc52887a3af"><no>16.3</no><block><txt break.before="1">Prescribed tidal work that is a jetty or a pier is designed and constructed in a way to ensure it remains above water at all times.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.54-tble2" guid="_14e86d1a-a917-4f57-a3f6-105f43c05bdc"><block><txt break.before="1">The design and construction of the jetty or pier is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.54-tble2-para1.a" guid="_3751b6f1-7b5e-4789-812f-d35b93d5bb76"><no>(a)</no><block><txt break.before="1">subject to paragraph (b), either—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.54-tble2-para1.a-para2.i" guid="_94125bc6-5a37-402b-9ed5-9004472770b5"><no>(i)</no><block><txt break.before="1">the level of the deck of a jetty or pier is at least 300mm above the water at highest astronomical tide; or</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.54-tble2-para1.a-para2.ii" guid="_552a72f0-788c-4c93-965e-c825bc8404e4"><no>(ii)</no><block><txt break.before="1">piles or other markers indicate the presence of the jetty or pier when it is inundated;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.54-tble2-para1.b" guid="_026c53db-0cef-4dfc-b9d7-0d40f7b8591b"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.55" guid="_3df3464b-2a72-4d18-a6d0-f0f16ad80467"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.55-tble1" guid="_1f325c52-bf59-4ba2-b504-d1bf5169d684"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.55-tble1-para1.16.4" guid="_8231bb71-cf08-40fe-9fc7-c70586f0d41d"><no>16.4</no><block><txt break.before="1">Prescribed tidal work that is a jetty or pier and for a private purpose is designed and constructed in a way to ensure it is of a size suitable for maritime use while still minimising the amount of tidal water occupied by it.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.55-tble2" guid="_5bdd2a65-565a-4e7a-ae81-e215a3317aec"><block><txt break.before="1">(s 6(2) solution)</txt></block><block><txt break.before="1">The design and construction of the jetty or pier is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.55-tble2-para1.a" guid="_9e82b0b2-4246-4a65-a431-b21cc8f6d71f"><no>(a)</no><block><txt break.before="1">subject to paragraph (b), all parts of the deck of a jetty or pier have a width of at least 900mm and not more than 3m;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.55-tble2-para1.b" guid="_bbe252f4-2707-4615-b159-332c7aff471b"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.56" guid="_b59e35b2-fd93-40c7-9b38-affdf193c56c"><entry namest="1" nameend="2" rowsep="1" align="center" valign="top" id="sch.4A-sec-tbl-tblr-oc.56-tble1" guid="_7b8cd237-d014-401a-a5c0-2eac44da8aea"><block><txt break.before="1">Design, construction and safety—pipelines and other underground services</txt></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.57" guid="_230c0f9d-fe7d-4f35-ba51-7d2eb3733e1f"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.57-tble1" guid="_eee8b1b3-d2b0-4d8b-9d91-ba656ebf5acc"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.57-tble1-para1.17.1" guid="_ca69c833-c351-458f-8c25-358bbbda9da9"><no>17.1</no><block><txt break.before="1">The design and construction of prescribed tidal work that is a pipeline, or another underground service used instead of a pipeline, does not adversely affect the ability of vessels to be anchored near the work.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.57-tble2" guid="_6bef0ade-94c0-4957-a15d-71c3c657e077"><block><txt break.before="1">(s 6(2) solution)</txt></block><block><txt break.before="1">The design and construction of the pipeline or underground service is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.57-tble2-para1.a" guid="_9cabee3f-3786-4b7e-8402-a967dd1605fe"><no>(a)</no><block><txt break.before="1">subject to paragraph (b), a pipeline or other underground service is installed at least 1.2m below the surface of land, after it is installed;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.57-tble2-para1.b" guid="_227ccccb-f384-4d59-8999-cb21318d34f2"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.58" guid="_150da15e-220f-409f-86ef-e67c64f98268"><entry namest="1" nameend="2" rowsep="1" align="center" valign="top" id="sch.4A-sec-tbl-tblr-oc.58-tble1" guid="_eb476002-1672-468e-957f-1ffe4b47a332"><block><txt break.before="1">Design, construction and safety—pontoons</txt></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.59" guid="_91833d30-690e-42e8-a258-52fd33bc81c2"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.59-tble1" guid="_9def82b8-47e2-48be-90b1-b7523aef4d04"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.59-tble1-para1.18.1" guid="_c404e0a0-c9a9-4dc9-84db-8bd3ee58c9d4"><no>18.1</no><block><txt break.before="1">Prescribed tidal work that is a pontoon, for a private purpose, and not used only for rowing, is designed and constructed in a way to ensure it is able to support its intended loads, having regard to its relevant loading matters.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.59-tble2" guid="_e847a2f6-e939-4294-ad68-d6e3b3eb1ef6"><block><txt break.before="1">(s 6(2) solution)</txt></block><block><txt break.before="1">The design and construction of the pontoon is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.59-tble2-para1.a" guid="_c315bc71-3a40-4a4f-87d6-3b149681f599"><no>(a)</no><block><txt break.before="1">subject to paragraph (c), a pontoon for individual use is able to support at least a live load of 1.5kPa;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.59-tble2-para1.b" guid="_f02c5a50-f545-453b-8b16-a60a0511b03f"><no>(b)</no><block><txt break.before="1">subject to paragraph (c), a pontoon for group use is able to support at least a live load of 2.0kPa;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.59-tble2-para1.c" guid="_8e8380fa-0d5b-435f-997f-8c4e083ee01c"><no>(c)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a) or (b)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a) or (b).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.60" guid="_6799300e-d611-443a-94d0-fbf054b42ff1"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.60-tble1" guid="_f7ed6433-fd34-4251-b1d8-9973c8c5474c"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.60-tble1-para1.18.2" guid="_bfa69ec1-4391-4ad7-8be9-3c887e200bcd"><no>18.2</no><block><txt break.before="1">Prescribed tidal work that is a pontoon, for a non-private purpose, and not used only for rowing, is designed and constructed in a way to ensure it is able to support its intended loads, having regard to its relevant loading matters.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.60-tble2" guid="_b35ec643-7719-4b07-99c3-137cd22a7f14"><block><txt break.before="1">(s 6(2) solution)</txt></block><block><txt break.before="1">The design and construction of the pontoon is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.60-tble2-para1.a" guid="_ce1e8e43-e506-49aa-8898-e6b6014250a9"><no>(a)</no><block><txt break.before="1">subject to paragraph (c), a pontoon open for use by the general public or used for a commercial purpose is able to support at least the following—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.60-tble2-para1.a-para2.i" guid="_baecab62-d0b7-45a8-aa52-3194d151d60d"><no>(i)</no><block><txt break.before="1">a distributed live load of 3.0kPa;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.60-tble2-para1.a-para2.ii" guid="_b48a1927-2252-46d7-99f9-95ec31ef7704"><no>(ii)</no><block><txt break.before="1">a concentrated live load of 4.5kN;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.60-tble2-para1.b" guid="_d4fbe757-c591-4901-94c4-aae0d8286b0d"><no>(b)</no><block><txt break.before="1">subject to paragraph (c), a pontoon other than a pontoon mentioned in paragraph (a) is able to support at least the following—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.60-tble2-para1.b-para2.i" guid="_a6e4868b-c58d-4dbe-b57d-3fb1adb3541c"><no>(i)</no><block><txt break.before="1">a distributed live load of 2.0kPa;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.60-tble2-para1.b-para2.ii" guid="_8808289f-a703-4c1b-8ed1-15a6fa55889d"><no>(ii)</no><block><txt break.before="1">a concentrated live load of 4.5kN;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.60-tble2-para1.c" guid="_6ad211f7-618a-4f43-a558-2e2c35fe61b8"><no>(c)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a) or (b)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a) or (b).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.61" guid="_4321b43a-b25e-46c5-9a67-238d6c5feb9a"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.61-tble1" guid="_4f1df2d2-39f4-4e09-8221-38be2ca1d74a"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.61-tble1-para1.18.3" guid="_c8a3ef92-e5a9-483a-af4d-2ff8f81475fc"><no>18.3</no><block><txt break.before="1">Prescribed tidal work that is a pontoon and used only for rowing is designed and constructed in a way to ensure—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.61-tble1-para1.18.3-para2.a" guid="_db49d262-1f3e-49f2-a88e-1252931b47a5"><no>(a)</no><block><txt break.before="1">it is able to support its intended loads, having regard to its relevant loading matters; and</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.61-tble1-para1.18.3-para2.b" guid="_d40abfaa-ccba-4c37-92ec-7c3f42dbd981"><no>(b)</no><block><txt break.before="1">it is safe for persons using the pontoon to launch and retrieve rowing vessels.</txt></block></tli></tlist></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.61-tble2" guid="_0e4994d2-8f0f-482e-9dc7-fd30716e05f9"><block><txt break.before="1">(s 6(2) solution)</txt></block><block><txt break.before="1">The design and construction of the pontoon is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.61-tble2-para1.a" guid="_de0d1132-938c-4dae-8975-84377cec8102"><no>(a)</no><block><txt break.before="1">subject to paragraph (c), the access walkway of a pontoon used only for rowing is able to support at least a live load of 3.0kPa;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.61-tble2-para1.b" guid="_06a4abb7-5d23-4259-9a51-7597fa80bbd9"><no>(b)</no><block><txt break.before="1"> the flotation unit of a pontoon used only for rowing is able to support at least a live load of 1.5kPa;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.61-tble2-para1.c" guid="_0407ab1f-2fd1-489f-91f9-1628b8f0d75c"><no>(c)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a) or (b)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a) or (b).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.62" guid="_b7ed3ded-8b5e-47a8-a246-c03a69d9e98a"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.62-tble1" guid="_57411738-a893-4bb0-b23f-3f54b5b1ccbd"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.62-tble1-para1.18.4" guid="_2892a3c3-1178-47cf-a53f-ca59b6fafd6e"><no>18.4</no><block><txt break.before="1">Prescribed tidal work that is a pontoon is designed and constructed in a way to ensure any load applied to the pontoon by a person or thing on the pontoon does not cause the pontoon to tip over or tilt to a degree causing the person or thing to fall off the pontoon.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.62-tble2" guid="_56079106-3ed8-4398-bbdf-09f54df0712d"><block><txt break.before="1">(s 6(2) solution)</txt></block><block><txt break.before="1">The design and construction of the pontoon is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.62-tble2-para1.a" guid="_558b3ea3-b8bd-4547-82c6-995f48a1ab0f"><no>(a)</no><block><txt break.before="1">subject to paragraph (f), a pontoon’s access walkway extends at least 500mm onto the pontoon’s flotation unit;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.62-tble2-para1.b" guid="_8073e911-bb82-46e8-ac2d-dbd6c6af8358"><no>(b)</no><block><txt break.before="1">subject to paragraph (f), a pontoon’s access walkway is constructed with a material that has a non-slippery surface;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.62-tble2-para1.c" guid="_b91d6a7c-c7fd-44d6-902d-07428fe58281"><no>(c)</no><block><txt break.before="1">for a pontoon used only for rowing—subject to paragraph (f), at least 75mm of the height of the pontoon’s flotation unit remains above the water over which it is constructed if a distributed live load is applied to half of the surface of the pontoon’s flotation unit and all of the surface of the pontoon’s access walkways;</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.63" guid="_ef85f5fe-8792-4638-919f-8dac535a4b73"><entry colname="1" colsep="1" rowsep="1" id="sch.4A-sec-tbl-tblr-oc.63-tble1" guid="_6409f80d-ea8e-4eb5-a169-4db198f22b62"/><entry colname="2" rowsep="1" id="sch.4A-sec-tbl-tblr-oc.63-tble2" guid="_b0763b29-3300-46c4-a715-8ed7e15d7bd5"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.63-tble2-para1.d" guid="_63685f8b-a992-448a-8b87-4c168d900b95"><no>(d)</no><block><txt break.before="1">for a pontoon other than a pontoon mentioned in paragraph (c)—subject to paragraph (f), the top surface of the pontoon’s flotation unit remains above the water over which it is constructed if a distributed live load of 1.5kPa is applied to half of the surface of the pontoon’s flotation unit and all of the surface of the pontoon’s access walkways;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.63-tble2-para1.e" guid="_3067f946-4356-440d-b304-0e88280875a6"><no>(e)</no><block><txt break.before="1">subject to paragraph (f), the whole base of the pontoon’s flotation unit remains in contact with the water over which it is constructed at all times and tilts no more than 15&#186; at any time;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.63-tble2-para1.f" guid="_8794427c-eeaf-4c58-82c0-67c50e0adfbf"><no>(f)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a), (b), (c), (d) or (e)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a), (b), (c), (d) or (e).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.64" guid="_f7cd4413-dc7f-4f7b-bfb3-3dad7b9017c2"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.64-tble1" guid="_046468f2-d474-49b4-a754-2e49c812dd99"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.64-tble1-para1.18.5" guid="_aaa30c8a-cb30-425f-b555-7ccdc4a1e7a1"><no>18.5</no><block><txt break.before="1">Prescribed tidal work that is a pontoon is designed and constructed in a way to ensure it remains above the water at all times.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.64-tble2" guid="_828f9f95-d886-4dce-95fd-80d5b14c1cfe"><block><txt break.before="1">The design and construction of the pontoon is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.64-tble2-para1.a" guid="_e729c5aa-3c5d-453e-be54-54857a361ac7"><no>(a)</no><block><txt break.before="1">subject to paragraph (b), the pontoon’s abutment is located no less than 300mm above the water at high water mark;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.64-tble2-para1.b" guid="_7aa75ca3-3ab0-4ac3-a180-6a9bcb53d125"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.65" guid="_3012d9f5-2932-46a3-80d6-ff8a758b375c"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.65-tble1" guid="_f34622d4-9377-4220-b699-be83bc1e4da1"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.65-tble1-para1.18.6" guid="_a3e0be20-6e74-4f31-9dbd-bf0abe824c22"><no>18.6</no><block><txt break.before="1">Prescribed tidal work that is a pontoon is designed and constructed in a way to ensure that if tidal water levels change, the pontoon’s flotation unit will—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.65-tble1-para1.18.6-para2.a" guid="_eec21129-c29b-4b09-b133-ccb3fe488986"><no>(a)</no><block><txt break.before="1">rise and fall to allow for the change; and</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.65-tble1-para1.18.6-para2.b" guid="_c3bee40f-3471-4c87-8abe-3a61d5d19d99"><no>(b)</no><block><txt break.before="1">not be separated from the lot to which the pontoon is connected.</txt></block></tli></tlist></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.65-tble2" guid="_14ea7e0d-1831-489b-86b5-1a83c0777c59"><block><txt break.before="1">The design and construction of the pontoon is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.65-tble2-para1.a" guid="_10c215b4-3326-43f1-94a4-b8b01f66285f"><no>(a)</no><block><txt break.before="1">subject to paragraph (c), the pontoon’s flotation unit is—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.65-tble2-para1.a-para2.i" guid="_f5595553-eaa1-411c-bf39-48afb38cde5a"><no>(i)</no><block><txt break.before="1">attached, through the pontoon’s system for mooring the unit, to concrete anchors in the bank landward of the pontoon; or</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.65-tble2-para1.a-para2.ii" guid="_bfde54fb-036e-4e9d-8ca6-7efaef34c7ae"><no>(ii)</no><block><txt break.before="1">moored by piles;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.65-tble2-para1.b" guid="_6427a9bd-3f0d-4677-80a6-803f973da1d4"><no>(b)</no><block><txt break.before="1">subject to paragraph (c), if a tidal water level change resulting from a 1% probability flood event would cause a pontoon’s flotation unit to detach from the system for mooring the unit—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.65-tble2-para1.b-para2.i" guid="_45dd2979-e8fc-47c9-bd8e-31161bee796f"><no>(i)</no><block><txt break.before="1">the standard applying under paragraph (a); and</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.65-tble2-para1.b-para2.ii" guid="_3d2efdb6-aa47-418f-9a3e-1fa305f59d85"><no>(ii)</no><block><txt break.before="1">the pontoon’s flotation unit is restrained with a tethering system so that it can withstand the effects of the event;</txt></block></tli></tlist></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.66" guid="_8bf17e06-f8e4-402e-9fcb-a28cd11fce15"><entry colname="1" colsep="1" rowsep="1" id="sch.4A-sec-tbl-tblr-oc.66-tble1" guid="_85332314-a2f1-47c6-8922-3d49bc2ae8ec"/><entry colname="2" rowsep="1" id="sch.4A-sec-tbl-tblr-oc.66-tble2" guid="_927214e1-67b3-4357-b10a-f97e55f62d91"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.66-tble2-para1.c" guid="_8a02aa3c-fe48-4df3-a543-6002763f1499"><no>(c)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a) or (b)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a) or (b).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.67" guid="_86cf008d-5c82-4c5b-ac8a-fb7846abc001"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.67-tble1" guid="_4d3f18ec-96df-4b86-9712-1712a3ace6aa"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.67-tble1-para1.18.7" guid="_7e53f8c4-62be-4ca9-bde3-d0d830b0dcff"><no>18.7</no><block><txt break.before="1">Prescribed tidal work that is a pontoon identifies the lot to which the pontoon is connected.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.67-tble2" guid="_89862e8d-879f-49dd-ba83-844bd2ebea93"><block><txt break.before="1">(s 6(2) solution)</txt></block><block><txt break.before="1">The design and construction of the pontoon is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.67-tble2-para1.a" guid="_1b70f637-95ca-4126-8098-565b64fa77a9"><no>(a)</no><block><txt break.before="1">a label that identifies the lot to which the pontoon is connected is written or stamped on, or fixed to, the outside of the pontoon’s flotation unit;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.67-tble2-para1.b" guid="_f431d690-86ec-4f4b-a932-25c6cc41767c"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.68" guid="_8424de8e-d4a4-4ccb-9160-59f50415ad31"><entry namest="1" nameend="2" rowsep="1" align="center" valign="top" id="sch.4A-sec-tbl-tblr-oc.68-tble1" guid="_518badf0-cb74-4093-b580-460ceeb23cc2"><block><txt break.before="1">Design, construction and safety—retaining walls, revetments and seawalls</txt></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.69" guid="_23cbd6de-2496-4ab0-96d1-d5da880b5f72"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.69-tble1" guid="_379a70d6-53e4-4b30-bae4-aaf7ba353e34"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.69-tble1-para1.19.1" guid="_475bd20b-04aa-4605-a4f4-44b1025543d4"><no>19.1</no><block><txt break.before="1">Prescribed tidal work that is a retaining wall, revetment or seawall, is designed and constructed in a way to ensure it is able to support its intended loads, having regard to its relevant loading matters.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.69-tble2" guid="_f9bb52c1-ca3a-4b21-a63d-8e9e5d37a0e8"><block><txt break.before="1">(s 6(2) solution)</txt></block><block><txt break.before="1">The design and construction of the retaining wall, revetment or seawall is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.69-tble2-para1.a" guid="_71adb785-9034-4586-b582-98826f72ffed"><no>(a)</no><block><txt break.before="1">subject to paragraph (b), a retaining wall, revetment or seawall is able to support at least a distributed live load of 3.0kPa;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.69-tble2-para1.b" guid="_e6c77400-19c1-42d0-89c2-1a1d0538106b"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.70" guid="_f5f19272-3990-4c12-b2ba-939ab018cc21"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.70-tble1" guid="_8d526ad2-0ef6-4758-84b1-c9bfcd695108"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.70-tble1-para1.19.2" guid="_8ec2a720-2f7f-4af5-9c23-1032a19989bd"><no>19.2</no><block><txt break.before="1">Prescribed tidal work that is a retaining wall, revetment or seawall, is designed and constructed in a way to ensure it can withstand—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.70-tble1-para1.19.2-para2.a" guid="_6f3818ee-3917-47d2-8a29-a3a54acecd81"><no>(a)</no><block><txt break.before="1">any tendency of overturning or sliding; and</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.70-tble1-para1.19.2-para2.b" guid="_015c0590-2d3d-4663-8c4e-01fa91bf4615"><no>(b)</no><block><txt break.before="1">any other effects of waves or changes in water levels on the retaining wall, revetment or seawall.</txt></block></tli></tlist></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.70-tble2" guid="_95d32217-3ee7-4dda-b92b-f0bfb7226926"><block><txt break.before="1">(s 6(2) solution)</txt></block><block><txt break.before="1">The design and construction of the retaining wall, revetment or seawall is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.70-tble2-para1.a" guid="_e95540af-58a5-4944-8a7b-783b35e97995"><no>(a)</no><block><txt break.before="1">subject to paragraph (c), a retaining wall, revetment or seawall has a factor of safety of no less than 1.5;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.70-tble2-para1.b" guid="_98d9c84b-aa23-4cf6-9244-4b214cedf38b"><no>(b)</no><block><txt break.before="1">subject to paragraph (c), a retaining wall, revetment or seawall is able to withstand the effect of waves, or waves and water levels, resulting from a storm or other natural event of a magnitude that has a 2% or lower probability of occurring in any calendar year;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.70-tble2-para1.c" guid="_729fc867-d0de-4ed5-923a-0070946bf1d9"><no>(c)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a) or (b)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a) or (b).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.71" guid="_5a8992ef-a696-40b5-b112-a382b38d88bd"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.71-tble1" guid="_26850309-da95-4e11-bc07-dbe5b48a5062"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.71-tble1-para1.19.3" guid="_a45e0642-9fb6-476f-be16-90421324a017"><no>19.3</no><block><txt break.before="1">Prescribed tidal work that is a retaining wall, revetment or seawall not founded upon rock, is designed and constructed to protect the seaward side of retaining wall, revetment or seawall from erosion.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.71-tble2" guid="_b4df9d14-3a2d-48b3-bd09-9fb9c041532e"><block><txt break.before="1">(s 6(2) solution)</txt></block><block><txt break.before="1">The design and construction of the retaining wall, revetment or seawall is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.71-tble2-para1.a" guid="_75ac7ed2-3a49-4702-a40c-85d352e66f44"><no>(a)</no><block><txt break.before="1">subject to paragraph (c), a retaining wall, revetment or seawall provides for a sub-layer or enough filter material to ensure it is reasonably likely to remain in place for at least 50 years;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.71-tble2-para1.b" guid="_c0a5f34d-23a9-45ea-a678-664386adb193"><no>(b)</no><block><txt break.before="1">subject to paragraph (c), the bottom edge of the base of a retaining wall, revetment or seawall is reasonably likely to prevent any adverse effects from potential erosion of the soil under the retaining wall, revetment or seawall for at least 50 years;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.71-tble2-para1.c" guid="_3d406e84-2a41-49d9-9b9d-0aad9dd5741c"><no>(c)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a) or (b)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a) or (b).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.72" guid="_b0aca792-9cde-49d0-b9f8-e3d2f307a712"><entry colname="1" colsep="1" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.72-tble1" guid="_a18ff781-7a92-4470-8941-0be147da75d6"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.72-tble1-para1.19.4" guid="_b8ed5f0c-5f1a-489d-a68a-4f8b5e25131c"><no>19.4</no><block><txt break.before="1">Prescribed tidal work that is a retaining wall, revetment or seawall, is not adversely affected by hydrostatic pressure behind the retaining wall, revetment or seawall.</txt></block></tli></tlist></block></entry><entry colname="2" rowsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.72-tble2" guid="_47af6419-3412-4cd7-8844-c2982327fb42"><block><txt break.before="1">The design and construction of the retaining wall, revetment or seawall is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.72-tble2-para1.a" guid="_633121f7-e266-497c-9495-45f47c562d95"><no>(a)</no><block><txt break.before="1">subject to paragraph (b), a retaining wall, revetment or seawall provides for drainage holes, and suitable filter material behind the holes, to relieve any hydrostatic pressure behind the retaining wall, revetment or seawall;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.72-tble2-para1.b" guid="_a647c0dc-5ba5-4a06-9816-5340b125ab26"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a).</txt></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.73" guid="_8c4018e8-fe5b-4aa0-af9c-a58688f8c617"><entry namest="1" nameend="2" rowsep="1" align="center" valign="top" id="sch.4A-sec-tbl-tblr-oc.73-tble1" guid="_99362eab-ac4c-4f86-b44b-6f4c61218585"><block><txt break.before="1">Design, construction and safety—wharves</txt></block></entry></row><row rowsep="0" id="sch.4A-sec-tbl-tblr-oc.74" guid="_8102971f-3405-4bf4-badb-1b5aa932a3b8"><entry colname="1" colsep="1" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.74-tble1" guid="_29de7b6b-9181-4acb-93f1-3b1387581046"><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.74-tble1-para1.20.1" guid="_fd3bd1bc-0a70-45fa-8c78-1c7df796a9c9"><no>20.1</no><block><txt break.before="1">Prescribed tidal work that is a wharf is designed and constructed in a way to ensure it is able to support its intended loads, having regard to its relevant loading matters.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.4A-sec-tbl-tblr-oc.74-tble2" guid="_ad3184d7-a80a-4b59-b801-489c1db5cbd3"><block><txt break.before="1">(s 6(2) solution)</txt></block><block><txt break.before="1">The design and construction of the wharf is consistent with the following standards—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.74-tble2-para1.a" guid="_e71fab71-57f0-4557-b245-859680be03dd"><no>(a)</no><block><txt break.before="1">subject to paragraph (c), a major wharf, or a minor wharf accessible to vehicular traffic, is able to support at least the following—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.74-tble2-para1.a-para2.i" guid="_0c56c800-235c-4826-8263-71295804ebcb"><no>(i)</no><block><txt break.before="1">a distributed live load of 5.0kPa;</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.74-tble2-para1.a-para2.ii" guid="_c2004555-881f-4f4d-80f9-e9f90759a4bd"><no>(ii)</no><block><txt break.before="1">a concentrated live load of 13kN; or</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.74-tble2-para1.b" guid="_9a424459-3b49-4b3c-a021-24b9c6cf8b57"><no>(b)</no><block><txt break.before="1">subject to paragraph (c), a minor wharf not accessible to vehicular traffic is able to support at least the following—</txt></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.74-tble2-para1.b-para2.i" guid="_a216ffb1-368e-42ea-9668-2e3c80fcb380"><no>(i)</no><block><txt break.before="1">a distributed live load of 5.0kPa; or</txt></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.74-tble2-para1.b-para2.ii" guid="_17abc58d-a41a-4b72-98c9-1ed613d5f5bb"><no>(ii)</no><block><txt break.before="1">a concentrated live load of 4.5kN; or</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="manual"><tli id="sch.4A-sec-tbl-tblr-oc.74-tble2-para1.c" guid="_77da3a13-9dcd-4d5e-8bf5-78909a9b1508"><no>(c)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a) or (b)—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a) or (b).</txt></block></tli></tlist></block></entry></row></tbody></tgroup></table></block></clause></part><historynote><txt break.before="1"><b>sch 4A</b> ins <legref jurisd="QLD" type="act" target.doc.id="sl-2005-0275" target.version.series="b034c269-9d45-4dea-abc9-286d7bdf87c8" valid.date="as.made" check="valid">2005 SL&#160;No.&#160;275</legref> s 4</txt></historynote></schedule><schedule id="sch.5" guid="_49e0b07a-3778-44d4-9b4c-41fa616a0ea8" type="schedule" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>Schedule 5</no><heading id="sch.5-he" guid="_d891f61a-ecc7-48b4-8314-d559de515323">Dictionary</heading><sourceref id="sch.5-ref" guid="_ed8f0fc6-fdb8-4221-8b7a-0a8ca84a83a6" affected.by.uncommenced="0">section&#160;3</sourceref><block><deflist><definition id="sch.5-def.aidtonavigation_" guid="_19f66ccc-62bd-48bd-9600-c744ec28bf17" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.5-def.aidtonavigation" guid="_26eec092-c7e1-45bc-b411-6a4ddc1d055c" type="definition">aid to navigation</defterm> has the meaning given by the <legref jurisd="QLD" type="act" target.doc.id="act-1994-014" target.version.series="44f453e2-ccd9-4a10-af83-c3dccd6d5dbe" check="valid"><name emphasis="yes">Transport Operations (Marine Safety) Act 1994</name></legref>, <legref jurisd="QLD" type="act" refid="sec.104" target.doc.id="act-1994-014" target.version.series="44f453e2-ccd9-4a10-af83-c3dccd6d5dbe" check="invalid">section&#160;104</legref>.</txt><historynote><txt break.before="1">def <defterm guid="_3aa0c5a5-e676-40d0-9381-2f784ffa41dd" type="mention">aid to navigation</defterm> ins <legref jurisd="QLD" type="act" target.doc.id="sl-2005-0275" target.version.series="b034c269-9d45-4dea-abc9-286d7bdf87c8" valid.date="as.made" check="valid">2005 SL&#160;No.&#160;275</legref> s 5(1)</txt></historynote></definition><definition id="sch.5-def.allocation_" guid="_89aa20b2-0464-480c-afe9-89da81aa5f51" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.5-def.allocation" guid="_402959ac-0ac9-45dd-8152-e7d24d2868f4" type="definition">allocation</defterm> means an allocation of quarry material under chapter 2, part 5, division 1, of the <legref jurisd="QLD" type="act" target.doc.id="UNKNOWN" check="invalid">Act</legref>.</txt></definition><definition id="sch.5_" guid="_4349eb8c-bcde-4990-a1ea-f61224b3a381" status="repealed" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.5-def.approveddredgemanagementplan" guid="_83979331-b08e-415a-a9b4-89eef095c276" type="mention">approved dredge management plan</defterm> ...</txt><historynote><txt break.before="1">def <defterm guid="_64bb3029-fae0-4f10-b0cc-8f4587a0d322" type="mention">approved dredge management plan</defterm> amd <legref jurisd="QLD" type="act" target.doc.id="sl-2006-0221" target.version.series="a104c8f7-4eae-45c6-a76c-829e3a7936cd" valid.date="as.made" check="valid">2006 SL&#160;No.&#160;221</legref> s 7(1)</txt></historynote><historynote><txt break.before="1">om <legref jurisd="QLD" type="act" target.doc.id="sl-2012-0002" target.version.series="68c6c420-af81-4fd0-8f17-4d05b858ec5e" valid.date="as.made" check="valid">2012 SL&#160;No.&#160;2</legref> s 11(1)</txt></historynote></definition><definition id="sch.5-def.Brisbanecoreportland_" guid="_96eabda8-3858-4d50-a23e-aaff55050331" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.5-def.Brisbanecoreportland" guid="_dc4ca940-151c-4aed-b250-7a61bf068acd" type="definition">Brisbane core port land</defterm> has the meaning given in the <legref jurisd="QLD" type="act" target.doc.id="act-1994-008" target.version.series="060a2469-1586-4719-b2aa-d22cc9ff8daf" check="valid"><name emphasis="yes">Transport Infrastructure Act 1994</name></legref>, <legref jurisd="QLD" type="act" refid="sch.6" target.doc.id="act-1994-008" target.version.series="060a2469-1586-4719-b2aa-d22cc9ff8daf" check="invalid">schedule&#160;6</legref>.</txt><historynote><txt break.before="1">def <defterm guid="_0ce0f598-9973-4be3-accd-4bb5fc4509bd" type="mention">Brisbane core port land</defterm> ins <legref jurisd="QLD" type="act" target.doc.id="act-2010-019" target.version.series="597a24fa-6815-40a5-b9df-d085a14a6f38" valid.date="as.made" check="valid">2010 Act&#160;No.&#160;19</legref> s 21</txt></historynote></definition><definition id="sch.5-def.commencement_" guid="_5516cf05-eab7-43fc-bb6a-ad9ea5b1faad" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.5-def.commencement" guid="_844fa91e-ad67-4a88-90b6-00520b408038" type="definition">commencement</defterm>, for part 5, see section&#160;17.</txt><historynote><txt break.before="1">def <defterm guid="_8c259b9c-7391-4877-9e02-3bd23fbe9b02" type="mention">commencement</defterm> ins <legref jurisd="QLD" type="act" target.doc.id="sl-2012-0002" target.version.series="68c6c420-af81-4fd0-8f17-4d05b858ec5e" valid.date="as.made" check="valid">2012 SL&#160;No.&#160;2</legref> s 11(2)</txt></historynote></definition><definition id="sch.5-def.dredgemanagementplan_" guid="_979bf949-b42f-4ca6-b722-4d3ef46dde10" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.5-def.dredgemanagementplan" guid="_3a31ff2c-ab31-47a6-8a18-2942d7b8831f" type="definition">dredge management plan</defterm> means a dredge management plan continued in effect under <legref jurisd="QLD" type="act" refid="sec.201" target.doc.id="UNKNOWN" check="invalid">section&#160;201</legref> of the <legref jurisd="QLD" type="act" target.doc.id="UNKNOWN" check="invalid">Act</legref>.</txt><historynote><txt break.before="1">def <defterm guid="_ee5d2498-b404-4da8-b24f-c5fb3cb78cb1" type="mention">dredge management plan</defterm> amd <legref jurisd="QLD" type="act" target.doc.id="sl-2006-0221" target.version.series="a104c8f7-4eae-45c6-a76c-829e3a7936cd" valid.date="as.made" check="valid">2006 SL&#160;No.&#160;221</legref> s 7(2)</txt></historynote><historynote><txt break.before="1">sub <legref jurisd="QLD" type="act" target.doc.id="sl-2012-0002" target.version.series="68c6c420-af81-4fd0-8f17-4d05b858ec5e" valid.date="as.made" check="valid">2012 SL&#160;No.&#160;2</legref> s 11(1)–(2)</txt></historynote></definition><definition id="sch.5-def.governmentbody_" guid="_546930b7-ecc0-4044-b954-dfeef87d0e83" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.5-def.governmentbody" guid="_94f5f115-46cb-4f8b-b52c-c4893ce3afa6" type="definition">government body</defterm>, for schedule&#160;4, item 1, means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.5-def.governmentbody-para1.a" guid="_53d6351b-d765-4ad7-948d-888f89a45f35" provision.type="other"><no>(a)</no><block><txt break.before="0">a department, or part of a department; or</txt></block></li><li id="sch.5-def.governmentbody-para1.b" guid="_1b92af98-d40f-4fe0-8ee4-bf76729fc10b" provision.type="other"><no>(b)</no><block><txt break.before="0">a local government.</txt></block></li></list></definition><definition id="sch.5_-oc.2" guid="_01231cc9-0dad-44c3-b8fe-a43ac7882e1c" status="repealed" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.5-def.preliminaryapproval" guid="_2e4d2853-dfda-4244-b003-0e812ee41101" type="mention">preliminary approval</defterm> ...</txt><historynote><txt break.before="1">def <defterm guid="_50705a8d-20d8-4075-94d5-57f10e5bf1e7" type="mention">preliminary approval</defterm> om <legref jurisd="QLD" type="act" target.doc.id="sl-2013-0204" target.version.series="66379cf4-9460-4c09-a4a4-e0cdf9643291" valid.date="as.made" check="valid">2013 SL&#160;No.&#160;204</legref> s 6</txt></historynote></definition><definition id="sch.5_-oc.3" guid="_f6bf0fc0-5818-4183-a6a5-b0e9b2fa3e17" status="repealed" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.5-def.prescribedtidalwork" guid="_36a1a65c-8a99-41c9-9bfd-d8bf2f1aad19" type="mention">prescribed tidal work</defterm> ...</txt><historynote><txt break.before="1">def <defterm guid="_ab4e888e-b3c8-46cd-ae15-0d8e4f22b1f6" type="mention">prescribed tidal work</defterm> ins <legref jurisd="QLD" type="act" target.doc.id="sl-2005-0275" target.version.series="b034c269-9d45-4dea-abc9-286d7bdf87c8" valid.date="as.made" check="valid">2005 SL&#160;No.&#160;275</legref> s 5(1)</txt></historynote><historynote><txt break.before="1">om 2017 SL No. 103 s 31</txt></historynote></definition><definition id="sch.5-def.prescribedtidalworks_" guid="_ab6fe986-94b0-4d2c-a837-24db0218ba34" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.5-def.prescribedtidalworks" guid="_b0da99f6-0019-48de-bf3a-5d14db2ec676" type="definition">prescribed tidal works</defterm> means the work prescribed as prescribed tidal works under sections 16 and 16A.</txt><historynote><txt break.before="1">def <defterm guid="_1b18fcba-8616-4eeb-b90e-994603bfd67b" type="mention">prescribed tidal works</defterm> ins 2017 SL No. 103 s 31</txt></historynote></definition><definition id="sch.5-def.previous_" guid="_9613ad34-c038-4e4d-97c7-14c9d50223d5" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.5-def.previous" guid="_bf78da46-61ee-47a6-a636-d2a699119d0a" type="definition">previous</defterm>, for part 5, see section&#160;17.</txt><historynote><txt break.before="1">def <defterm guid="_04d084ce-27c4-41e1-b609-86a3d5ce5364" type="mention">previous</defterm> ins <legref jurisd="QLD" type="act" target.doc.id="sl-2012-0002" target.version.series="68c6c420-af81-4fd0-8f17-4d05b858ec5e" valid.date="as.made" check="valid">2012 SL&#160;No.&#160;2</legref> s 11(2)</txt></historynote></definition><definition id="sch.5_-oc.4" guid="_ecf42a6d-6bf3-47e9-ba7a-84a8b6e64b23" status="repealed" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.5-def.privatepurpose" guid="_dfafdb79-2862-4f16-af4b-ec531b1014e6" type="mention">private purpose</defterm> ...</txt><historynote><txt break.before="1">def <defterm guid="_670dd251-1aa5-439e-806c-358f1809977d" type="mention">private purpose</defterm> amd <legref jurisd="QLD" type="act" target.doc.id="sl-2005-0275" target.version.series="b034c269-9d45-4dea-abc9-286d7bdf87c8" valid.date="as.made" check="valid">2005 SL&#160;No.&#160;275</legref> s 5(2)</txt></historynote><historynote><txt break.before="1">om <legref jurisd="QLD" type="act" target.doc.id="sl-2013-0204" target.version.series="66379cf4-9460-4c09-a4a4-e0cdf9643291" valid.date="as.made" check="valid">2013 SL&#160;No.&#160;204</legref> s 6</txt></historynote></definition><definition id="sch.5-def.publicmarinefacility_" guid="_4da51db9-d6e4-481d-97d6-c4e9f1367972" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.5-def.publicmarinefacility" guid="_1a94f204-4c46-43b7-9ff0-048ad694eb30" type="definition">public marine facility</defterm> see <legref jurisd="QLD" type="act" target.doc.id="act-1994-008" target.version.series="060a2469-1586-4719-b2aa-d22cc9ff8daf" check="valid"><name emphasis="yes">Transport Infrastructure Act 1994</name></legref>, <legref jurisd="QLD" type="act" refid="sch.6" target.doc.id="act-1994-008" target.version.series="060a2469-1586-4719-b2aa-d22cc9ff8daf" check="invalid">schedule&#160;6</legref>.</txt><historynote><txt break.before="1">def <defterm guid="_5aedf366-346b-476d-a1cb-5ccece6e84d2" type="mention">public marine facility</defterm> amd <legref jurisd="QLD" type="act" target.doc.id="sl-2005-0275" target.version.series="b034c269-9d45-4dea-abc9-286d7bdf87c8" valid.date="as.made" check="valid">2005 SL&#160;No.&#160;275</legref> s 5(3)</txt></historynote></definition><definition id="sch.5_-oc.5" guid="_fec21489-bc66-403f-a0db-bc2636da2d7c" status="repealed" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.5-def.residence" guid="_0a8f3bc4-0957-4202-a9e3-5ad31d73a30d" type="mention">residence</defterm> ...</txt><historynote><txt break.before="1">def <defterm guid="_a55c6cfb-06c0-456a-b669-92ccc219c20a" type="mention">residence</defterm> om <legref jurisd="QLD" type="act" target.doc.id="sl-2013-0204" target.version.series="66379cf4-9460-4c09-a4a4-e0cdf9643291" valid.date="as.made" check="valid">2013 SL&#160;No.&#160;204</legref> s 6</txt></historynote></definition><definition id="sch.5_-oc.6" guid="_896a3573-b217-4e2e-afd7-287b7f00ec19" status="repealed" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.5-def.waiverapplication" guid="_c57323b3-85d6-4bb0-8419-2ef8a4909c36" type="mention">waiver application</defterm> ...</txt><historynote><txt break.before="1">def <defterm guid="_15fe2346-5d71-4f63-a477-c77ec6e4ecbe" type="mention">waiver application</defterm> om <legref jurisd="QLD" type="act" target.doc.id="sl-2012-0002" target.version.series="68c6c420-af81-4fd0-8f17-4d05b858ec5e" valid.date="as.made" check="valid">2012 SL&#160;No.&#160;2</legref> s 11(1)</txt></historynote></definition></deflist></block></schedule></schedules></subordleg>