<?xml version="1.0" encoding="utf-8"?>
<!DOCTYPE act PUBLIC "-//OQPC//DTD QuILLS Act//EN" "Act.dtd">
<!--************************************************************************************************************-->
<!--                                              DISCLAIMER                                                    -->
<!---->
<!--Queensland does not accept responsibility for the accuracy or completeness of material on this website      -->
<!--(or any other website referred to on this website) except as set out below. Users should exercise their     -->
<!--own skill and care in the use of the material.                                                              -->
<!---->
<!--No warranty is given that the material located on this site, or on any other site referred to on this site, -->
<!--is free from error or omission. Users should exercise their own skill and care with respect to the use of   -->
<!--the material. Accordingly, the State of Queensland and its servants and agents expressly disclaim liability -->
<!--for any act done or omission made in reliance on any such material and any consequences of any such act or  -->
<!--omission. This notice must not be erased.                                                                   -->
<!---->
<!--************************************************************************************************************-->
<act amending="none" assent.date="2011-10-28T00:00:00+10:00" first.valid.date="2022-09-07T00:00:00+10:00" id="act-2011-031" in.force="allinforce" no="31" print.type="speciallabel:act-2011-031" special.label="bill-2022-049" title="Waste Reduction and Recycling Act 2011" type="act" version.desc.id="e750f053-c5fc-49ce-bf36-59a6f81de509" version.series.id="07efc892-7dc1-4b97-b47d-6e515230fbf2" year.assent="2011" publication.date="2023-02-23"><coverdata guid="_a5646f4b-106a-4b4e-9433-5bb8a1645437" id="cd"><statusrecord guid="_c4908e78-fe21-4447-9cc8-81452ab7ba38" id="cd-status"><heading change="ins" guid="_0cf45a0c-6da1-466f-96ed-ccb9d9301e74" id="cd-status-he">Indicative reprint note</heading><block><txt break.before="1"><ins xml:space="preserve">This is an unofficial version of a reprint of this Act that incorporates all proposed amendments to the Act included in the Waste Reduction and Recycling and Other Legislation Amendment Bill 2023. This indicative reprint has been prepared for information only—it is not an authorised reprint of the Act.</ins></txt><txt break.before="1"><ins/></txt></block><block><txt break.before="1"><ins xml:space="preserve">Enacted but uncommenced amendments included in the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="yes">Public Sector Act 2022</name></legref> No. 34 have also been incorporated in this indicative reprint.</ins></txt><txt break.before="1"><ins/></txt></block><block><txt break.before="1"><ins xml:space="preserve">Amendments to this Act are also included in the Environmental Protection and Other Legislation Amendment Bill 2022. These proposed amendments are not included in this indicative reprint.</ins></txt><txt break.before="1"><ins/></txt></block><block><txt break.before="1"><ins xml:space="preserve">The point-in-time date for this indicative reprint is the introduction date for the Waste Reduction and Recycling and Other Legislation Amendment Bill 2023—22 February 2023.</ins></txt><txt break.before="1"><ins/></txt></block><block><txt break.before="1"><ins xml:space="preserve">Detailed information about indicative reprints is available on the <b>Information</b> page of this website.</ins></txt></block></statusrecord></coverdata><wrapper><front guid="_8a0091de-bf40-4333-a454-81185f92b20e" id="frnt"><shorttitle guid="_49eebfbb-c56e-4a51-b8fb-52704dff0b82" id="frnt-st">Waste Reduction and Recycling Act 2011</shorttitle><longtitle guid="_922a7630-478a-4511-9179-cf4d397cb449" id="frnt-lt"><block><txt break.before="1">An Act to encourage the proper use of resources by improving ways of reducing and dealing with waste and to repeal the <legref check="valid" jurisd="QLD" target.doc.id="sl-2000-0180" target.version.series="1d8dafe3-2f50-4b7e-b42d-938ec9328d50" type="subordleg"><name emphasis="yes">Environmental Protection (Waste Management) Policy 2000</name></legref></txt></block></longtitle></front><body numbering.style="manual"><chapter affected.by.uncommenced="0" guid="_a76c0db3-d9c9-4095-9a30-beaab8465e54" id="ch.1"><no>Chapter 1</no><heading guid="_11460c71-0351-4795-b591-9500de56161b" id="ch.1-he">Preliminary</heading><part affected.by.uncommenced="0" guid="_5f317301-65f0-4579-8a2e-58e7e54599ec" id="ch.1-pt.1"><no>Part 1</no><heading guid="_d901d569-7cab-4bf5-ac40-6775cf5f9672" id="ch.1-pt.1-he">Introduction</heading><clause affected.by.uncommenced="0" guid="_6e01d339-7951-4104-a86e-9e6be40f109d" id="sec.1" provision.type="other" spent.amends="0"><no>1</no><heading guid="_a866f4f0-ecae-4b36-a42a-1b8ab059f65e" id="sec.1-he">Short title</heading><block><txt break.before="1">This Act may be cited as the <legref check="valid" jurisd="QLD" target.doc.id="act-2011-031" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" type="act"><name emphasis="yes">Waste Reduction and Recycling Act 2011</name></legref>.</txt></block></clause><clause affected.by.uncommenced="0" guid="_c71b4ada-d2f5-4764-91b8-969c92d76387" id="sec.2" provision.type="other" spent.amends="0"><no>2</no><heading guid="_802ad077-21f4-4620-b950-3dc22e688091" id="sec.2-he">Commencement</heading><subclause affected.by.uncommenced="0" guid="_e137c916-8241-48dc-9013-85c148d50cda" id="sec.2-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The following provisions commence on 1 December 2011—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_51535fac-f465-4bac-a69a-55a44c1f248b" id="sec.2-ssec.1-para1" provision.type="other"><no>•</no><block><txt break.before="0">chapter 3, parts 3, 4 and <intref check="valid" refid="ch.3-pt.7" target.guid="_8b622854-5c3f-43a1-8565-ec5b747fd989">7</intref></txt></block></li><li guid="_2b3c588d-9cc9-4346-b333-bae87895505b" id="sec.2-ssec.1-para1-oc.2" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="sec.63" target.guid="_96adeb33-f091-4c60-a7ed-0372dc95cf90">sections 63</intref> and <intref check="valid" refid="sec.65" target.guid="_dbbd9665-2907-4272-9ade-c6776056d494">65</intref></txt></block></li><li guid="_16e9641b-8b90-4649-a752-58f2462ebee6" id="sec.2-ssec.1-para1-oc.3" provision.type="other"><no>•</no><block><txt break.before="0">chapters 5, 6, 7 and 8</txt></block></li><li guid="_9e45d17a-424d-4b5e-b400-82c48ef0a26f" id="sec.2-ssec.1-para1-oc.4" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="ch.15" target.guid="_e29e6029-0de7-4179-b4b5-dc009e83ff1d">chapter 15</intref>, <intref check="valid" refid="ch.15-pt.1" target.guid="_cb874e86-2711-4689-b761-86215eb8de6d">part 1</intref></txt></block></li><li guid="_c10ff2a1-74d4-4fc1-83fe-91e8b75f49d4" id="sec.2-ssec.1-para1-oc.5" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="sec.300" target.guid="_b89a8273-763a-465f-aa9c-867d1f13b309">sections 300</intref> and <intref check="valid" refid="sec.301" target.guid="_0ef127da-dbbc-47d6-b77b-22405df3f019">301</intref></txt></block></li><li guid="_91263284-94dd-4cd8-bd76-1dc94839bb5d" id="sec.2-ssec.1-para1-oc.6" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="ch.16" target.guid="_542c15e9-1dcd-4dcf-b2de-64676d3964ab">chapter 16</intref>, <intref check="valid" refid="ch.16-pt.1" target.guid="_a8f15e4a-491f-4d69-803a-4003792ffe3d">parts 1</intref>, <intref check="valid" refid="ch.16-pt.2" target.guid="_7f1dc6f9-4297-49a8-9d02-952b11b88ac1">2</intref> and <intref check="valid" refid="ch.16-pt.3" target.guid="_033f6b4c-1960-4538-9459-51cef67151ae">3</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a562ca58-814f-459a-9e1a-2ff4759598d2" id="sec.2-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="ch.16" target.guid="_542c15e9-1dcd-4dcf-b2de-64676d3964ab">Chapter 16</intref>, <intref check="invalid" refid="pt.4">parts 4</intref> to <intref check="invalid" refid="pt.7">7</intref> commence on a day to be fixed by proclamation.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_fe94d6f8-d7d7-45ee-b632-e5862debf4ee" id="ch.1-pt.2"><no>Part 2</no><heading guid="_6a3d30ca-2201-4b91-8f65-496db8a2478c" id="ch.1-pt.2-he">Objects, applicable principles and application of Act</heading><clause affected.by.uncommenced="0" guid="_9aecef41-d4a4-40aa-92cd-99e5cd02c4c9" id="sec.3" provision.type="other" spent.amends="0"><no>3</no><heading guid="_99d2d66c-a1f9-4354-8617-ff6723356f49" id="sec.3-he">Objects of Act</heading><block><txt break.before="1">The objects of this Act are the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f42d57fd-4a7d-4963-9107-ecc74d32828c" id="sec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to promote waste avoidance and reduction, and resource recovery and efficiency actions;</txt></block></li><li change="ins" guid="_31979855-a5c7-48b5-8329-02b29e4397c7" id="sec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to promote and facilitate Queensland’s transition to a circular economy;</txt></block></li><li change="ins" guid="_33e11ccb-5690-4b63-b46b-56983d31c1d3" id="sec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">to promote activities across government, business, industry and the community that extend the life cycle of products and materials;</txt></block></li><li change="renumber" guid="_97af5aba-bfa0-4344-b5a0-387fdfef8fe8" id="sec.3-para1.d" provision.type="other"><no>(<del xml:space="preserve">b</del><ins xml:space="preserve">d</ins>)</no><block><txt break.before="0">to reduce the consumption of natural resources and minimise the disposal of waste by encouraging waste avoidance and the recovery, re-use and recycling of waste;</txt></block></li><li change="renumber" guid="_69bab06a-48c9-4529-a1f9-3e8e9642d93d" id="sec.3-para1.e" provision.type="other"><no>(<del xml:space="preserve">c</del><ins xml:space="preserve">e</ins>)</no><block><txt break.before="0">to minimise the overall impact of waste generation and disposal;</txt></block></li><li change="renumber" guid="_53c42b48-6cbb-42b8-9100-f4bed6b5953d" id="sec.3-para1.f" provision.type="other"><no>(<del xml:space="preserve">d</del><ins xml:space="preserve">f</ins>)</no><block><txt break.before="0">to ensure a shared responsibility between government, business and industry and the community in waste management and resource recovery;</txt></block></li><li change="renumber" guid="_2fc7da83-82db-409f-9f1f-3db4a7608270" id="sec.3-para1.g" provision.type="other"><no>(<del xml:space="preserve">e</del><ins xml:space="preserve">g</ins>)</no><block><txt break.before="0">to support and implement national frameworks, objectives and priorities for waste management and resource recovery.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_f4dd7f9b-f57c-463f-95a9-0b1403302a20" id="sec.4" provision.type="other" spent.amends="0"><no>4</no><heading guid="_e65d15c0-3207-49c1-99c1-c89d7b11eef5" id="sec.4-he">Achieving Act’s objects</heading><subclause affected.by.uncommenced="0" guid="_9ee5a8f5-680c-434e-a2e2-0d5b9cd437de" id="sec.4-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If, under this Act, a function or power is conferred on a person, the person must perform the function or exercise the power in a way that best achieves the objects of this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d9a72fc8-396b-4af3-ab9e-e7328b71c924" id="sec.4-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.4-ssec.1" target.guid="_9ee5a8f5-680c-434e-a2e2-0d5b9cd437de">subsection (1)</intref>, the achievement of the objects of this Act must if practicable be guided by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b8a9366e-bf0a-42c6-91d4-acb9626ee6d8" id="sec.4-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the waste and resource management hierarchy; and</txt></block></li><li guid="_4ac264f4-3fe5-418d-821b-f51d87fa3a69" id="sec.4-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the following policy principles (the <defterm guid="_b114c103-96d5-4518-b19f-d13ff2479684" id="sec.4-ssec.2-def.wasteandresourcemanagementprinciples" type="definition">waste and resource management principles</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li change="ins" guid="_0f91f2c2-f262-465f-bfb2-0881dda42ff4" id="sec.4-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the circular economy principle;</txt></block></li><li change="renumber" guid="_ba5e0329-b000-4204-bef9-b99d620e3075" id="sec.4-ssec.2-para1.b-para2.ii" provision.type="other"><no>(i<ins xml:space="preserve">i</ins>)</no><block><txt break.before="0">the polluter pays principle;</txt></block></li><li change="renumber" guid="_491f5f78-bb90-4377-9d7d-2e795f5fb530" id="sec.4-ssec.2-para1.b-para2.iii" provision.type="other"><no>(ii<ins xml:space="preserve">i</ins>)</no><block><txt break.before="0">the user pays principle;</txt></block></li><li change="renumber" guid="_1535791f-c63c-4961-a625-a6d1dde09c06" id="sec.4-ssec.2-para1.b-para2.iv" provision.type="other"><no>(<del xml:space="preserve">iii</del><ins xml:space="preserve">iv</ins>)</no><block><txt break.before="0">the proximity principle;</txt></block></li><li change="renumber" guid="_26b2bb24-83b9-45c9-897b-5b28d28d0e54" id="sec.4-ssec.2-para1.b-para2.v" provision.type="other"><no>(<del xml:space="preserve">i</del>v)</no><block><txt break.before="0">the product stewardship principle.</txt></block></li></list></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c37f2785-7462-40d6-ac86-33d43df0e26a" id="sec.5" provision.type="other" spent.amends="0"><no>5</no><heading guid="_66d70371-a31b-4e79-b69d-b4dbbb7e1d9f" id="sec.5-he">Approach to achieving Act’s objects</heading><block><txt break.before="1">The objects of this Act are intended primarily to be achieved through approaches that include the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c6605926-1a8a-4446-9031-811cfa2ee7f4" id="sec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">preparation, implementation and maintenance of a waste management strategy for the State;</txt></block></li><li guid="_daa4a738-4c2a-4757-8c7f-6144e9e3fca3" id="sec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">providing for the preparation of State, local government and industry strategic waste management plans;</txt></block></li><li guid="_30a9b147-4574-4edd-8986-22c54c9d1d79" id="sec.5-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">price signalling, including through the introduction of a levy on waste delivered to a levyable waste disposal site;</txt></block></li><li guid="_2ae94c84-51fb-46a0-956d-b52e158130c8" id="sec.5-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">providing for reporting requirements for the State, local governments and business and industry;</txt></block></li><li guid="_20818c09-4900-4ca3-b324-78f4ab12e355" id="sec.5-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">banning particular waste disposal;</txt></block></li><li guid="_9e6ffafd-d560-4a02-9918-117478eb08e6" id="sec.5-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">identifying priority products or priority waste and associated management tools;</txt></block></li><li guid="_164999a8-0da5-4411-a597-d86db823470f" id="sec.5-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">preparation, implementation and maintenance of a priority statement;</txt></block></li><li guid="_5473e5c2-4ba8-436d-9853-88df09a1be90" id="sec.5-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">providing for product stewardship schemes;</txt></block></li><li guid="_4d57799b-2ab0-4bd0-bbe0-a3fbb56cadc2" id="sec.5-para1.i" provision.type="other"><no>(i)</no><block><txt break.before="0">waste tracking requirements;</txt></block></li><li guid="_d94ddc5e-75db-4ced-b798-74f0a8385a6b" id="sec.5-para1.j" provision.type="other"><no>(j)</no><block><txt break.before="0">making end of waste codes and granting end of waste approvals;</txt></block></li><li guid="_9c2e1bd6-6eaf-475f-a37e-337641a41aa4" id="sec.5-para1.k" provision.type="other"><no>(k)</no><block><txt break.before="0">prohibiting particular conduct in relation to waste;</txt></block></li><li guid="_9d4f569c-75cc-4906-9235-491b97f9d8d4" id="sec.5-para1.l" provision.type="other"><no>(l)</no><block><txt break.before="0">appointing authorised persons to investigate matters arising under this Act and otherwise to enforce this Act;</txt></block></li><li guid="_4d1b482b-af4b-46f2-bf58-efad524f3457" id="sec.5-para1.m" provision.type="other"><no>(m)</no><block><txt break.before="0">supporting approaches mentioned in <intref check="valid" refid="sec.5-para1.a" target.guid="_c6605926-1a8a-4446-9031-811cfa2ee7f4">paragraphs (a)</intref> to <intref check="valid" refid="sec.5-para1.l" target.guid="_9d4f569c-75cc-4906-9235-491b97f9d8d4">(l)</intref> through the making of regulations under this Act.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_ef138f3a-b069-4163-89f9-51563986012e" id="sec.6" provision.type="other" spent.amends="0"><no>6</no><heading guid="_e0d8ff69-43a1-451f-87bd-bd5be37d3a60" id="sec.6-he">Act binds all persons</heading><subclause affected.by.uncommenced="0" guid="_38fb4e33-99e7-41a2-9e4e-76d687425c2f" id="sec.6-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This Act binds all persons, including the State and, to the extent the legislative power of the Parliament permits, the Commonwealth and the other States.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_35ae8478-0ca6-4e19-a4dc-2968ccd870de" id="sec.6-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the Commonwealth or a State can not be prosecuted for an offence against this Act.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_a05f4105-b399-4fe0-93c3-f5a2f01d7678" id="ch.1-pt.3"><no>Part 3</no><heading guid="_f233005c-5c61-4a67-89db-7b7548405ecc" id="ch.1-pt.3-he">Interpretation</heading><division affected.by.uncommenced="0" guid="_ca649610-1d05-42b5-8ede-be299e5822ee" id="ch.1-pt.3-div.1"><no>Division 1</no><heading guid="_8d47c731-925e-448f-a8f2-51e4e2ce738a" id="ch.1-pt.3-div.1-he">Dictionary</heading><clause affected.by.uncommenced="0" guid="_a5233574-e098-4075-bb69-a22e2aa9c815" id="sec.7" provision.type="other" spent.amends="0"><no>7</no><heading guid="_bc63739c-ef73-4dda-b24a-f379e6bd4809" id="sec.7-he">Definitions</heading><block><txt break.before="1">The dictionary in the schedule defines particular words used in this Act.</txt></block></clause></division><division affected.by.uncommenced="0" guid="_a5ba6a56-d3ee-4248-a44c-e59169ac62af" id="ch.1-pt.3-div.2"><no>Division 2</no><heading guid="_87f4ec08-1810-4131-9f46-8a69931d34ab" id="ch.1-pt.3-div.2-he">Key concepts and definitions</heading><clause affected.by.uncommenced="0" guid="_7601e4e4-c3b0-4253-bd29-e32c31726222" id="sec.8" provision.type="other" spent.amends="0"><no>8</no><heading guid="_a5884e8d-382a-47c1-9484-a456ec177f6d" id="sec.8-he">The concept of <defterm guid="_feee689f-312a-4145-ae2b-40ab9fc9478b" type="mention">disposal</defterm></heading><subclause affected.by.uncommenced="0" guid="_9641377a-2963-49be-ada0-e8fde217d360" id="sec.8-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This Act commonly uses the expression <defterm guid="_257c76d7-ac48-4fb0-99ca-e6dda5457449" id="sec.8-def.disposal-oc.2" type="definition">disposal</defterm> in relation to waste.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6229ea9e-d26f-4381-b15f-b3e87e813572" id="sec.8-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In practical terms, a primary outcome arising from the implementation of this Act’s provisions is intended to be a reduction in the amount of waste that permanently, or at least indefinitely, effectively becomes incorporated into land, commonly referred to as becoming landfill.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_557e4ebd-4153-42ba-aef5-23223a5b1413" id="sec.8-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Accordingly, in this Act, a reference to <defterm guid="_30b15bdf-18a9-42e8-b6da-74511d9e063e" id="sec.8-def.disposal-oc.3" type="definition">disposal</defterm> in relation to waste may ordinarily be taken to mean the depositing of the waste, other than on a temporary or short term basis, into or onto land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8d8b0168-dc1e-45cc-8e33-ea877c3e09ca" id="sec.8-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0"><intref check="valid" refid="sec.8-ssec.3" target.guid="_557e4ebd-4153-42ba-aef5-23223a5b1413">Subsection (3)</intref> does not limit what <defterm guid="_8cf91a9c-8ccd-4ff5-82ed-123639475f0e" id="sec.8-def.disposal-oc.4" type="definition">disposal</defterm> may be taken to mean in an appropriate context.</txt></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_4856fd88-c7b6-49c3-955e-d13423b46ac2" id="sec.8AA" provision.type="other" spent.amends="0"><no>8AA </no><heading guid="_b737f6b2-c2c6-4728-a5ce-dee0704cc0ca" id="sec.8AA-he">Meaning of <defterm guid="_fde54563-d21f-4cf4-91af-5f37afcdccd8" type="mention">waste</defterm></heading><subclause affected.by.uncommenced="0" guid="_5379c370-1b94-4691-9a4f-45aa09ccb95f" id="sec.8AA-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0"><defterm guid="_2104b97e-368e-401c-9a02-a268edddfda0" id="sec.8AA-def.Waste" type="definition">Waste</defterm> includes any thing that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8e4a9abb-524a-487f-bf5e-b4d2a32c0312" id="sec.8AA-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is left over, or is an unwanted by-product, from an industrial, commercial, domestic or other activity; or</txt><note guid="_fe8d4248-f3b2-47d1-a46d-f5ae12024221" id="sec.8AA-ssec.1-para1.a-note" type="example"><heading guid="_ad75dde8-36a0-49bd-9221-2799aba7053a" id="sec.8AA-ssec.1-para1.a-note-he">Example—</heading><block><txt break.before="1">Abandoned or discarded material from an activity is left over, or is an unwanted by-product, from the activity.</txt></block></note></block></li><li guid="_406e950d-f25d-436d-b1a8-9521716d11d2" id="sec.8AA-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is surplus to the industrial, commercial, domestic or other activity generating the waste.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c1558c4a-1b6a-4d11-955a-2cee6fa76702" id="sec.8AA-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, <defterm guid="_3113c8ed-8146-43bf-8f33-b536fcf7a989" id="sec.8AA-def.waste-oc.2" type="definition">waste</defterm> does not include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4f130ff7-55a2-4c24-83e7-9e421424c898" id="sec.8AA-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a resource; or</txt><note guid="_1db863c0-c5a9-4c2a-9f63-d91ae31d501f" id="sec.8AA-ssec.2-para1.a-note" type="example"><heading guid="_fb6df64b-7ddd-4664-94bc-7c1df04d54f0" id="sec.8AA-ssec.2-para1.a-note-he">Note—</heading><block><txt break.before="1">See chapter 8.</txt></block></note></block></li><li guid="_1d2e4a80-facf-44e4-99ba-19960b4c8c19" id="sec.8AA-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a thing prescribed by regulation not to be waste.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6e6e43e6-eb92-48d7-a5cf-d2306007b935" id="sec.8AA-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0"><defterm guid="_b7bdb297-4a38-4f5f-8813-29aa8946f97c" id="sec.8AA-def.Waste-oc.2" type="definition">Waste</defterm> can be a gas, liquid, solid or energy, or a combination of any of them.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_98b39059-5a4a-47a6-aa78-148892b1d1e1" id="sec.8AA-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A thing can be <defterm guid="_0e80a8aa-08b6-4032-8e5b-103b79168df9" id="sec.8AA-def.waste-oc.3" type="definition">waste</defterm> whether or not it is of value.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e0c77c56-edd8-4af6-a8c0-cffd0a04f812" id="sec.8AA-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Despite subsection (2), a thing that is a resource, or is prescribed by regulation not to be waste, becomes waste if the thing—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5e7431b0-dd3e-4da8-9b8b-6e78076a735a" id="sec.8AA-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is disposed of at a waste disposal site; or</txt></block></li><li guid="_235efb4f-49d8-4f8a-8437-dcb371845dbf" id="sec.8AA-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is deposited at a place in a way that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_685b215c-f21a-43e7-b146-94e512113fea" id="sec.8AA-ssec.5-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">would, if the thing were waste, contravene the general littering provision or the illegal dumping of waste provision; or</txt></block></li><li guid="_d1605219-74e7-4066-bfaa-84cd02035f3e" id="sec.8AA-ssec.5-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the thing is a resource—is not permitted under an end of waste code or end of waste approval.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0a342165-b4cf-4112-b752-41b76ec6ffcd" id="sec.8AA-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The Minister may recommend to the Governor in Council the making of a regulation under subsection (2)(b) (a <defterm guid="_b007e855-eca4-47a3-975e-9ce19a109854" id="sec.8AA-def.proposedchange" type="definition">proposed change</defterm>) only after—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3eaf82b3-ef8d-4d7b-a5f6-d4eb57836148" id="sec.8AA-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">carrying out consultation with the public about the proposed change; and</txt></block></li><li guid="_5e3cac9b-0d10-4e04-9182-0a557c1d953d" id="sec.8AA-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">considering the following matters—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f302089b-7577-46ec-9df1-b0d882df77fc" id="sec.8AA-ssec.6-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the results of the public consultation about the proposed change;</txt></block></li><li guid="_6c7b34b9-5743-4629-ac86-20d23fe02004" id="sec.8AA-ssec.6-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">whether making the proposed change is likely to achieve the objects of this Act;</txt></block></li><li guid="_9aa1acc3-4017-4974-8855-27cf4878fd7d" id="sec.8AA-ssec.6-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">whether making the proposed change is likely to achieve the object of the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Environmental Protection Act</name></legref>;</txt></block></li><li guid="_b6bcbb7f-3b5e-49c7-b7d3-a3b386a32bb8" id="sec.8AA-ssec.6-para1.b-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">whether there are other measures that would be more effective in achieving the intended outcome of the proposed change.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c8205062-362c-47ae-bc68-d77141c3d935" id="sec.8AA-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_be299689-2942-477f-abfb-4cdc15c91a95" id="sec.8AA-ssec.7-def.endofwasteapproval_"><txt break.before="1"><defterm guid="_a2938b8b-7902-4309-b27f-04e658b153bd" id="sec.8AA-ssec.7-def.endofwasteapproval" type="definition">end of waste approval</defterm> see section 159(2).</txt></definition><definition affected.by.uncommenced="0" guid="_1ad2c8a9-74df-4a18-87fb-66e6f0672c9a" id="sec.8AA-ssec.7-def.endofwastecode_"><txt break.before="1"><defterm guid="_8599b96b-e67d-4a2a-8c26-e292d8335626" id="sec.8AA-ssec.7-def.endofwastecode" type="definition">end of waste code</defterm> see section 159(1).</txt></definition><definition affected.by.uncommenced="0" guid="_f7f6da95-6b9f-4fdb-8a6f-082e56ab91bb" id="sec.8AA-ssec.7-def.resource_"><txt break.before="1"><defterm guid="_b9ff7c49-6f73-42be-ade7-8a56978a6f49" id="sec.8AA-ssec.7-def.resource" type="definition">resource</defterm> see section 155(2).</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0f5ba32f-22f7-4ecf-acc9-535f9b7054fe" id="sec.8A" provision.type="other" spent.amends="0"><no>8A</no><heading guid="_c1af9c40-ef32-4b4a-b076-6677548f3e93" id="sec.8A-he">Meaning of <defterm guid="_28d0db74-9230-4604-9bd4-bcf590f00b77" type="mention">waste disposal site</defterm></heading><subclause affected.by.uncommenced="0" guid="_6c14321e-5df0-42b5-8e9a-f4a9b5658575" id="sec.8A-ssec.1" provision.type="other"><no>(1)</no><block><deflist><block><txt break.before="0">A <defterm guid="_06397312-a2d4-411b-83f2-9f8c2e82ae7e" id="sec.8A-def.wastedisposalsite-oc.2" type="definition">waste disposal site</defterm> is a waste facility to which both of the following apply—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_40dcc081-9583-44e1-8530-d13731f8dcea" id="sec.8A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the operator of the facility is required to hold an environmental authority for the disposal of waste at the facility;</txt></block></li><li guid="_d9fa3799-af2d-4e91-b970-c4c2a28fb0d2" id="sec.8A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">waste delivered to the facility sometimes includes waste that is subsequently disposed of to landfill at the facility.</txt></block></li></list></block></deflist></block></subclause><subclause affected.by.uncommenced="0" guid="_8b8f244e-99fb-4c13-b648-1e8cbdc1577c" id="sec.8A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, a waste facility is not a <defterm guid="_b583560b-c2a0-4538-9c3a-24dfdaa89dde" id="sec.8A-def.wastedisposalsite-oc.3" type="definition">waste disposal site</defterm> only because a type of exempt waste prescribed by regulation for this definition is disposed of to landfill at the facility.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_978f3e38-8893-48e6-adb3-3b06f4c468de" id="sec.9" provision.type="other" spent.amends="0"><no>9</no><heading guid="_d3081acf-15af-4615-a851-e841832fb955" id="sec.9-he">Meaning of <defterm guid="_159c9203-b751-43e4-8cb2-53e86c06dd53" type="mention">waste and resource management hierarchy</defterm></heading><block><deflist><block><txt break.before="1">The <defterm guid="_b86ef773-bd94-4061-a482-4e790780b818" id="def.wasteandresourcemanagementhierarchy" type="definition">waste and resource management hierarchy</defterm> is the following precepts, listed in the preferred order in which waste and resource management options should be considered—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_49e32e28-80a2-4f14-a7dc-d7b33e0979da" id="sec.9-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">AVOID unnecessary resource consumption;</txt></block></li><li guid="_159e66fb-2f25-4916-9385-682f49a5cc82" id="sec.9-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">REDUCE waste generation and disposal;</txt></block></li><li guid="_ed882089-2e5f-4bcc-856f-3d6d6569fff0" id="sec.9-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">RE-USE waste resources without further manufacturing;</txt></block></li><li guid="_d6748ff9-56da-4a3f-9944-4f8ba92d0fe4" id="sec.9-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">RECYCLE waste resources to make the same or different products;</txt></block></li><li guid="_531b4500-57e7-4858-ac95-5b5df14e2432" id="sec.9-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">RECOVER waste resources, including the recovery of energy;</txt></block></li><li guid="_24e11c70-7ea7-4851-b8ab-621164f5b8e1" id="sec.9-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">TREAT waste before disposal, including reducing the hazardous nature of waste;</txt></block></li><li guid="_e1657482-25a2-41df-bd9d-054b802d798d" id="sec.9-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">DISPOSE of waste only if there is no viable alternative.</txt></block></li></list></block></deflist></block></clause><clause affected.by.uncommenced="0" change="ins" guid="_64cd5842-8b5c-4d8b-bb19-62ef562fd51c" id="sec.9A" provision.type="other" spent.amends="0"><no>9A</no><heading guid="_da3a3b71-741c-405a-b553-5d4b35e93767" id="sec.9A-he">Meaning of <defterm guid="_52844ae7-ae1a-4fad-b657-8f9ccf65c004" type="mention">circular economy principle</defterm> and <defterm guid="_dbb32b90-1ad3-441f-82f1-8aaa365a4330" type="mention">circular economy</defterm></heading><subclause affected.by.uncommenced="0" guid="_22d00cda-7a8c-4b23-a8f6-bcc57ba826ba" id="sec.9A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The <defterm guid="_73e3b164-a4f5-471c-ab8f-4c6f802227d1" id="sec.9A-def.circulareconomyprinciple-oc.2" type="definition">circular economy principle</defterm> is the principle that, to promote waste avoidance and minimise the impact of waste on the environment and human health, all products and materials should be kept in the economy for as long as they have value or remain useful.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d1334ea3-9b6c-4adf-8d0c-d9af3c024657" id="sec.9A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The circular economy principle recognises that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9dae5bec-b8d3-4ba6-88ac-9ab5a4342838" id="sec.9A-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">waste generation can be avoided by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c56484a8-f10a-47d9-b7a2-dc98bcab3eef" id="sec.9A-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">manufacturers designing, to the greatest extent practicable, their products and materials to be circular products and materials; and</txt></block></li><li guid="_70560643-6c91-4eda-8ead-51b075d4d74d" id="sec.9A-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">business and industry adopting new business models that support and incentivise the use of circular products and materials; and</txt></block></li><li guid="_0ea0e2de-35a6-4a02-8eb9-7834ebf21788" id="sec.9A-ssec.2-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">remanufacturing facilities being co-located at, and collaborating with, resource recovery facilities to prevent circular products and materials being disposed of to landfill; and</txt></block></li></list></block></li><li guid="_600b58e6-c526-4e4c-b2b3-7580bdcaacbd" id="sec.9A-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">unavoidable waste should be managed in accordance with the precepts of the waste and resource management hierarchy mentioned in section 9(c) to (g); and</txt></block></li><li guid="_39418464-021c-4b87-941f-1047d6e3f3d7" id="sec.9A-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">ecosystems are regenerated by reducing the demand for virgin materials; and</txt></block></li><li guid="_ed447fea-0dae-4aa7-8546-7f144faf1b03" id="sec.9A-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the adoption of circular products and materials should be incentivised in ways that increase the value of the products and materials.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7a93fd93-e941-4b7b-8065-dcdc026d6560" id="sec.9A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A <defterm guid="_9076d881-61ad-466b-ace3-c5c016bc7a82" id="sec.9A-def.circulareconomy-oc.2" type="definition">circular economy</defterm> is an economy in which all products and materials are kept for as long as they have value or remain useful.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_61652ce8-e492-43ba-a80d-850e67667f41" id="sec.9A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_34e69552-96a6-48cd-bb77-4711d63fae5c" id="sec.9A-ssec.4-def.circularproductsandmaterials_"><txt break.before="1"><defterm guid="_645e3998-4447-43b3-be8e-c387f15221a4" id="sec.9A-ssec.4-def.circularproductsandmaterials" type="definition">circular products and materials</defterm> means products and materials that can be reused, repaired, refurbished, repurposed or remanufactured.</txt></definition><definition affected.by.uncommenced="0" guid="_786ecfe4-2bef-41d8-ad30-4fc5dc4fca66" id="sec.9A-ssec.4-def.remanufacturingfacility_"><txt break.before="1"><defterm guid="_5d6c5406-8d60-4380-9367-1063671804aa" id="sec.9A-ssec.4-def.remanufacturingfacility" type="definition">remanufacturing facility</defterm> means a facility operated to carry out an activity relating to the reuse, repair, refurbishment, repurposing or remanufacturing of products or materials.</txt></definition><definition affected.by.uncommenced="0" guid="_f3134f12-6aba-40d1-b899-2bbaa6e5275a" id="sec.9A-ssec.4-def.resourcerecoveryfacility_"><txt break.before="1"><defterm guid="_b0c3c3d1-3c43-4ecc-9b49-b10b56e0fabd" id="sec.9A-ssec.4-def.resourcerecoveryfacility" type="definition">resource recovery facility</defterm> means a facility operated to carry out an activity relating to the receiving and sorting, dismantling or baling of waste.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_995cab1e-4dfd-4c6b-b75c-8bd9359d722a" id="sec.10" provision.type="other" spent.amends="0"><no>10</no><heading guid="_bdc193eb-ef7f-41cb-ad36-b55a15571d36" id="sec.10-he">Meaning of <defterm guid="_0082d2a5-0f7d-4aa5-be49-8d64127ccc63" type="mention">polluter pays principle</defterm></heading><subclause affected.by.uncommenced="0" guid="_36d39155-9924-403d-b8ba-67106143d971" id="sec.10-ssec.1" provision.type="other"><no>(1)</no><block><deflist><block><txt break.before="0">The <defterm guid="_3cd7b1c2-2ecc-4193-a8f0-bfab9557ec98" id="sec.10-def.polluterpaysprinciple-oc.2" type="definition">polluter pays principle</defterm> is the principle that all costs associated with the management of waste should be borne by the persons who generated the waste.</txt></block></deflist></block></subclause><subclause affected.by.uncommenced="0" guid="_eaac208c-b9c9-44a7-990d-732f71eb5ffb" id="sec.10-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The costs associated with the management of waste may include the costs of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bae40e2c-eb28-4824-b81a-a8012bc595eb" id="sec.10-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">minimising the amount of waste generated; and</txt></block></li><li guid="_aeecc662-b019-4079-ac3b-faeeaddcd651" id="sec.10-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">containing, treating and disposing of waste; and</txt></block></li><li guid="_ef5954f1-931e-4511-a290-c7c068b0301b" id="sec.10-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">rectifying environmental harm caused by waste.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e87d5d21-dc63-4ab8-8f63-d271181b77c1" id="sec.11" provision.type="other" spent.amends="0"><no>11</no><heading guid="_657c7681-5434-4e54-9abc-d4830b24bb02" id="sec.11-he">Meaning of <defterm guid="_1cc0c01f-013f-4c1c-9eda-5d531759a83c" type="mention">user pays principle</defterm></heading><subclause affected.by.uncommenced="0" guid="_ce18a6d0-71b3-45d9-8463-02c84ae672d0" id="sec.11-ssec.1" provision.type="other"><no>(1)</no><block><deflist><block><txt break.before="0">The <defterm guid="_d3bc7de7-9b71-4157-8e8c-a6ab37967956" id="sec.11-def.userpaysprinciple-oc.2" type="definition">user pays principle</defterm> is the principle that all costs associated with the use of a resource should be included in the prices of the goods and services (including government services) that result from the use.</txt></block></deflist></block></subclause><subclause affected.by.uncommenced="0" guid="_35403950-b4cc-4111-849a-22822823f668" id="sec.11-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In deciding what are the costs associated with the use of a resource, an amount received from a government as a subsidy, incentive payment, grant or similar payment, that would otherwise reduce the costs, must be disregarded.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e34868c5-7a4b-49c6-9f41-00c1c84ea7bc" id="sec.12" provision.type="other" spent.amends="0"><no>12</no><heading guid="_e416df75-ddd6-4a69-bede-50bfecb9ebc9" id="sec.12-he">Meaning of <defterm guid="_cd0efd0b-fed0-47c5-95d2-8b516f46de7c" type="mention">proximity principle</defterm></heading><block><deflist><block><txt break.before="1">The <defterm guid="_581e4ffb-70ec-44ec-97ac-0d86ebbd4312" id="def.proximityprinciple" type="definition">proximity principle</defterm> is the principle that waste and recovered resources should be managed as close to the source of generation as possible.</txt></block></deflist></block></clause><clause affected.by.uncommenced="0" guid="_eb53b3f9-50e7-4b78-b5e9-fcd311a8955a" id="sec.13" provision.type="other" spent.amends="0"><no>13</no><heading guid="_7633eab4-59fe-4996-a7c7-5e3bab8dccdc" id="sec.13-he">Meaning of <defterm guid="_e71a7228-cc4f-4c93-98ea-ea7049d5f0b6" type="mention">product stewardship principle</defterm></heading><subclause affected.by.uncommenced="0" guid="_0039ec4a-6ae3-450e-8d4b-972c9b681e63" id="sec.13-ssec.1" provision.type="other"><no>(1)</no><block><deflist><block><txt break.before="0">The <defterm guid="_9fa9b4b8-fdd9-4d5e-bc5c-fcdc027c29a4" id="sec.13-def.productstewardshipprinciple-oc.2" type="definition">product stewardship principle</defterm> is the principle that there is a shared responsibility between all persons who are involved in the life cycle of a product for managing the environmental, social and economic impact of the product.</txt></block></deflist></block></subclause><subclause affected.by.uncommenced="0" guid="_e735765a-01fb-4740-827f-a58b5d54053b" id="sec.13-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The product stewardship principle recognises that different roles and responsibilities may apply at each stage in the life cycle of a product.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c531e304-15c3-420c-8fdb-3a838af9bd04" id="sec.13-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the product stewardship principle does not apply to an entity—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_96f74426-b7aa-4451-8d88-e265d5a16aa0" id="sec.13-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in relation to a matter to which the packaging NEPM applies; or</txt></block></li><li guid="_1379d954-8496-4638-bd73-4a4e9a4635bb" id="sec.13-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the entity is a signatory to the Australian Packaging Covenant—in relation to a matter to which the covenant applies; or</txt></block></li><li guid="_477c4368-3ab7-4aa2-94b4-219f8f357992" id="sec.13-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the entity is a signatory to a national product stewardship arrangement, or a State-based product stewardship scheme approved or accredited under this Act, and is meeting its obligations under the arrangement or scheme—in relation to a matter to which the arrangement or scheme applies.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c438c626-e0e1-44bd-b89f-8f79e672741e" id="sec.13-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">An arrangement mentioned in <intref check="valid" refid="sec.13-ssec.3" target.guid="_c531e304-15c3-420c-8fdb-3a838af9bd04">subsection (3)</intref><intref check="valid" refid="sec.13-ssec.3-para1.c" target.guid="_477c4368-3ab7-4aa2-94b4-219f8f357992">(c)</intref> may be voluntary or mandatory in nature or may include both voluntary and mandatory aspects.</txt></block></subclause></clause></division></part></chapter><chapter affected.by.uncommenced="0" guid="_29862c69-b6b8-4395-83c6-161918cc9b7d" id="ch.2"><no>Chapter 2</no><heading guid="_cd47fd09-36cf-4b4c-8afd-ec91d06d4bc6" id="ch.2-he">Waste management strategy</heading><part affected.by.uncommenced="0" guid="_4b16d906-0879-43aa-9288-584eeadbabd9" id="ch.2-pt.1"><no>Part 1</no><heading guid="_013dd984-9bbe-4c83-b6cd-b2695d768a89" id="ch.2-pt.1-he">Introduction</heading><clause affected.by.uncommenced="0" guid="_bf32db97-2a18-4645-af60-bebe515dbcb2" id="sec.14" provision.type="other" spent.amends="0"><no>14</no><heading guid="_431b8e32-f80c-4098-83fa-ba51fd25d671" id="sec.14-he">Waste management strategy</heading><subclause affected.by.uncommenced="0" guid="_25d454a9-37a7-43d7-aaf4-042d4172552c" id="sec.14-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This part provides for the making of a waste management strategy for the State to help in achieving the objects of this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bfaf4845-b232-43e6-ba4d-b55e6a7e1ab1" id="sec.14-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The waste management strategy is intended as a long-term strategy for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_21dff160-db5f-43ac-8a66-6c3c19b0ff8d" id="sec.14-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">achieving waste avoidance, sustainable consumption, industry investment in innovation and new infrastructure, strategic regional infrastructure planning, and product stewardship; and</txt></block></li><li guid="_7a7d7121-d871-4aa0-bb4f-ce2edb461648" id="sec.14-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">securing continuous improvement in waste management and resource recovery practices, services and technologies, benchmarked against best available technology; and</txt></block></li><li guid="_f03c34f8-2ee1-486d-9211-ddc6b509efb0" id="sec.14-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">reducing the climate change impacts of waste management and disposal.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_96ba5859-0261-4fb5-a424-f45ada2ca51c" id="sec.15" provision.type="other" spent.amends="0"><no>15</no><heading guid="_452fcc39-7bb6-407e-bf65-4cec63bd00c1" id="sec.15-he">What may be included in State’s waste management strategy</heading><subclause affected.by.uncommenced="0" guid="_ab32cdc5-5171-41f3-aee8-b2859cbebfc4" id="sec.15-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The State’s waste management strategy may provide for anything affecting, or that may affect or be affected by, the management of waste.</txt></block></subclause><subclause affected.by.uncommenced="0" change="insReplace" guid="_d3c3bcdd-c30f-49df-8037-703fbfa2e521" id="sec.15-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting subsection (1), the strategy may provide for the following matters—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c9495e39-bae0-46e5-959a-a408c6b2f877" id="sec.15-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a circular economy;</txt></block></li><li guid="_889060b3-0326-41c3-9baf-fa8b4c785651" id="sec.15-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">waste avoidance and reduction;</txt></block></li><li guid="_fad02bc7-2b27-4dfb-bced-25b7ac48f117" id="sec.15-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">product design;</txt></block></li><li guid="_33df0ed3-b5a0-474b-aaa1-58572e6fbf8f" id="sec.15-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">consumption;</txt></block></li><li guid="_eda202e1-05cc-4cd2-9c9d-531660e24b57" id="sec.15-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">reuse or repair of products and materials;</txt></block></li><li guid="_56dc5f1c-c422-433a-9e2c-d99e4e324a2d" id="sec.15-ssec.2-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">resource efficiency;</txt></block></li><li guid="_35c4d0e5-75af-40b8-bde3-2a81609cc394" id="sec.15-ssec.2-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">product stewardship;</txt></block></li><li guid="_4a9f177f-25e6-4e72-9b9f-5a693f7b443f" id="sec.15-ssec.2-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">resource recovery;</txt></block></li><li guid="_97661805-bb62-4943-acae-7917a0f1e75f" id="sec.15-ssec.2-para1.i" provision.type="other"><no>(i)</no><block><txt break.before="0">recycling, including, for example, standards, criteria and specifications for recycled materials and products containing recycled materials;</txt></block></li><li guid="_b3e7005b-9438-42c4-ba68-1584a64268a0" id="sec.15-ssec.2-para1.j" provision.type="other"><no>(j)</no><block><txt break.before="0">priority products or priority waste;</txt></block></li><li guid="_7a3a4c98-a52a-46f2-b46f-5f857ab2bee8" id="sec.15-ssec.2-para1.k" provision.type="other"><no>(k)</no><block><txt break.before="0">strategic waste management and resource recovery planning;</txt></block></li><li guid="_1471cb46-3f30-424f-a957-2daa46ae4d5b" id="sec.15-ssec.2-para1.l" provision.type="other"><no>(l)</no><block><txt break.before="0">data collection and reporting.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" change="delReplace" guid="_be246ab3-83db-4e7d-b368-728bf64f0eaf-del" id="sec.15-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.15-ssec.1" target.guid="_ab32cdc5-5171-41f3-aee8-b2859cbebfc4">subsection (1)</intref>, the strategy may include the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_14127c95-3c86-4ab4-af12-008d854030bf-del" id="sec.15-ssec.2-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">waste avoidance;</txt></block></li><li guid="_9f2e554c-2255-4b00-b036-5a86dc9d6d33-del" id="sec.15-ssec.2-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">resource efficiency;</txt></block></li><li guid="_7d0f790a-974c-4f0d-bc06-7ce3801ac92f-del" id="sec.15-ssec.2-para1.c-del" provision.type="other"><no>(c)</no><block><txt break.before="0">resource recovery;</txt></block></li><li guid="_2c13d8fa-d5ac-4d1f-b2d5-8d6bddcb5400-del" id="sec.15-ssec.2-para1.d-del" provision.type="other"><no>(d)</no><block><txt break.before="0">product design;</txt></block></li><li guid="_645f7fc5-c8cb-4f01-8c37-e7c2b2f6c91f-del" id="sec.15-ssec.2-para1.e-del" provision.type="other"><no>(e)</no><block><txt break.before="0">consumption;</txt></block></li><li guid="_c7591e3e-95a2-41f7-aa25-b484c14f288a-del" id="sec.15-ssec.2-para1.f-del" provision.type="other"><no>(f)</no><block><txt break.before="0">product stewardship;</txt></block></li><li guid="_1e60c1c9-3233-42c1-bc6c-bbd117a332e2-del" id="sec.15-ssec.2-para1.g-del" provision.type="other"><no>(g)</no><block><txt break.before="0">priority products or priority waste;</txt></block></li><li guid="_1f5f3854-1d48-4cce-8b80-de9ec94b34b8-del" id="sec.15-ssec.2-para1.h-del" provision.type="other"><no>(h)</no><block><txt break.before="0">standards, criteria and specifications for recycled materials and products containing recycled material;</txt></block></li><li guid="_28551ffd-d9a7-4c9c-b610-96d7468feb7b-del" id="sec.15-ssec.2-para1.i-del" provision.type="other"><no>(i)</no><block><txt break.before="0">strategic waste management planning;</txt></block></li><li guid="_105398ea-9d48-4799-9ae1-5eea4a77c6f3-del" id="sec.15-ssec.2-para1.j-del" provision.type="other"><no>(j)</no><block><txt break.before="0">data reporting.</txt></block></li></list></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_4b6ee641-d0aa-41a1-9f9b-c731ed4baed9" id="ch.2-pt.2"><no>Part 2</no><heading guid="_961bbafb-4c37-4fcd-ac7a-d7f4ac459a74" id="ch.2-pt.2-he">Draft waste management strategy</heading><clause affected.by.uncommenced="0" guid="_005e5822-a07a-4120-b4db-549a9a83d275" id="sec.16" provision.type="other" spent.amends="0"><no>16</no><heading guid="_74e34b53-f2ec-4ff7-b239-b39deffff51e" id="sec.16-he">Preparation of draft strategy</heading><subclause affected.by.uncommenced="0" guid="_18269a7c-78be-4725-868d-86051f3f2710" id="sec.16-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must prepare a draft of the State’s waste management strategy.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2e471533-e1c5-4d8c-9018-6d3755a80747" id="sec.16-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive must give public notice when a draft of the waste management strategy has been prepared.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_33448945-c79e-482d-b623-aa755031d7e6" id="sec.16-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The notice must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0286fab1-acf3-4bd8-b44d-2d62f04dbd31" id="sec.16-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be published on the department’s website and in any other way the chief executive considers appropriate; and</txt></block></li><li guid="_e998073d-b5eb-4b9e-a0c4-03fcbe66688d" id="sec.16-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state where copies of the draft strategy may be inspected; and</txt></block></li><li guid="_0a3b6bf7-f749-4f22-907a-83fce1a7885c" id="sec.16-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">invite written submissions from the public on the draft strategy; and</txt></block></li><li guid="_4fd24184-c7a2-4e19-a1be-bd5f1f75d282" id="sec.16-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">state a day by which the written submissions may be given to the chief executive.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ac0ce4de-fe33-4fbb-bd81-ad510973383b" id="sec.16-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The period for receiving submissions must be at least 28 days.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_9ccef312-3baf-4811-94a9-abd5ee334ecd" id="ch.2-pt.3"><no>Part 3</no><heading guid="_4b59c986-5963-4c37-9e1d-96cc3ac6fa42" id="ch.2-pt.3-he">Making of waste management strategy</heading><clause affected.by.uncommenced="0" guid="_3cf687e6-27d8-4f57-a73d-8c2ab5bc12ee" id="sec.17" provision.type="other" spent.amends="0"><no>17</no><heading guid="_a90e8536-8616-4081-a462-c617d448e602" id="sec.17-he">Submissions to be considered when preparing final strategy</heading><subclause affected.by.uncommenced="0" guid="_685033ad-fa6a-4472-85dc-48634a2c6366" id="sec.17-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must prepare, and give to the Minister, a final version of the State’s waste management strategy.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_344aca12-1a0b-4b07-b0b8-8a29eb68cd98" id="sec.17-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In preparing the final version of the strategy, the chief executive must consider all submissions on the draft strategy given to the chief executive under <intref check="valid" refid="sec.16" target.guid="_005e5822-a07a-4120-b4db-549a9a83d275">section 16</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8440afab-f5ff-455f-af9c-0fad181d22dd" id="sec.18" provision.type="other" spent.amends="0"><no>18</no><heading guid="_322b9c89-a0c3-4f76-a87e-f6e073ceca17" id="sec.18-he">Approval of final strategy</heading><subclause affected.by.uncommenced="0" guid="_1dddb40b-1c29-415f-8eeb-b2aae0f9d54d" id="sec.18-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The final version of the waste management strategy must be approved by the Minister by gazette notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7aa3ddc8-a58b-4441-ab67-3508a7a6c89d" id="sec.18-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The waste management strategy comes into effect as the State’s waste management strategy on the day the Minister’s approval is gazetted or on a later day stated in the gazette notice or in the strategy for that purpose.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0d0ccfea-c347-4050-85d6-956dbaa45bb8" id="sec.18-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The gazette notice in which the Minister approves the waste management strategy must include details about where a copy of the strategy may be inspected and obtained.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_89d2c045-b719-40b7-91d6-f83fba8669d6" id="sec.18-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive must publish the waste management strategy in full on the department’s website as soon as practicable after its approval.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a92662eb-1a5c-49bd-a145-224cc3072575" id="sec.19" provision.type="other" spent.amends="0"><no>19</no><heading guid="_db1a7978-5523-4cbd-8109-55d104da2284" id="sec.19-he">Minor amendment of waste management strategy</heading><subclause affected.by.uncommenced="0" guid="_0e2ae504-8d0f-4190-9496-bc5e50001876" id="sec.19-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A minor amendment of the waste management strategy may be made without complying with the requirements of <intref check="valid" refid="ch.2-pt.2" target.guid="_4b6ee641-d0aa-41a1-9f9b-c731ed4baed9">part 2</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_12828ec9-dfc5-4386-a438-0fb03be64e6e" id="sec.19-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_e08ebcc2-6c53-4afa-8e0b-4fa08b080715" id="sec.19-ssec.2-def.minoramendment_"><txt break.before="1"><defterm guid="_1f0f26c7-3033-4a14-b7e4-d518100bfd71" id="sec.19-ssec.2-def.minoramendment" type="definition">minor amendment</defterm>, of the waste management strategy, means an amendment of the strategy—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e0580aaf-d501-4d5f-8999-0ce347a898da" id="sec.19-ssec.2-def.minoramendment-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to correct a minor error in the strategy; or</txt></block></li><li guid="_c4dd2e04-d8cd-4376-992b-9a4e14c27bd3" id="sec.19-ssec.2-def.minoramendment-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to make another change that is not a change of substance; or</txt></block></li><li guid="_ca9c6def-07b7-4bc8-8a27-dc73c2cb9e7d" id="sec.19-ssec.2-def.minoramendment-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">on 1 occasion only, to extend the period for which the strategy is in force for a period of not more than 1 year.</txt></block></li></list></definition></deflist></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_02578b44-c3f6-4af8-a6b9-ccdf9d54187d" id="ch.2-pt.4"><no>Part 4</no><heading guid="_3a8c2317-5636-4696-98dc-584c0bb97c01" id="ch.2-pt.4-he">Review and progress reporting</heading><clause affected.by.uncommenced="0" guid="_8afd193d-0ed5-4250-8918-64d08c21d129" id="sec.20" provision.type="other" spent.amends="0"><no>20</no><heading guid="_492a2a7d-a0d5-4de4-a491-0dce31ec785d" id="sec.20-he">Review of State’s waste management strategy</heading><subclause affected.by.uncommenced="0" change="insReplace" guid="_5dbcf7b7-a25c-4c4d-ba39-67824a353344" id="sec.20-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must, within 5 years after publishing a final review report under section 22(1), conduct a review of the State’s waste management strategy.</txt></block></subclause><subclause affected.by.uncommenced="0" change="delReplace" guid="_8f1677ff-331b-4e49-8b67-07e3c94a9390-del" id="sec.20-ssec.1-del" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must conduct reviews of the State’s waste management strategy—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5a6ba0ee-c42b-44a9-bb07-b59ce18c8c07-del" id="sec.20-ssec.1-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">for the first review—before the end of 2 years after the commencement of this section; and</txt></block></li><li guid="_a717f5ef-ba87-435c-adc0-cce555e1d4ca-del" id="sec.20-ssec.1-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">for subsequent reviews—before the end of 3 years after each final review report is published.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1805dbc3-4a9a-4697-91e7-7f025abca6df" id="sec.20-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, reviews may be conducted more frequently as the Minister directs.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_89d8d41d-5470-4419-8fee-96930984e07f" id="sec.21" provision.type="other" spent.amends="0"><no>21</no><heading guid="_fe3e045a-8baf-4ef6-a501-1af550131294" id="sec.21-he">Preparation of draft review report on waste management strategy</heading><subclause affected.by.uncommenced="0" guid="_5261ce69-3525-4049-9ae6-b7d03afbe3d1" id="sec.21-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">As part of the process of reviewing the State’s waste management strategy, the chief executive must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9d4b1b2b-8327-4f58-b9bc-7b1f6d15622d" id="sec.21-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">prepare a review report in draft form; and</txt></block></li><li guid="_12283dc9-d308-4cd0-b0d8-b7cf8e8d556b" id="sec.21-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give public notice when the draft has been prepared.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2e147145-f4ad-45c2-b854-369bdd854078" id="sec.21-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cd4678ce-c358-48a3-9954-bd3b47af5ba6" id="sec.21-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be published on the department’s website and in any other way the chief executive considers appropriate; and</txt></block></li><li guid="_82b839d7-ba20-4812-8472-ccd7fb209df4" id="sec.21-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state where copies of the draft review report may be inspected; and</txt></block></li><li guid="_43add659-ed59-4733-a284-7eef4c79f033" id="sec.21-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">invite written submissions from the public on the draft review report; and</txt></block></li><li guid="_510d9fa1-97d0-49f3-a949-cad4a3b4040a" id="sec.21-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">state a day by which the written submissions may be given to the chief executive.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5cfb9f1e-f6cc-41c8-8f25-fb63b7f29664" id="sec.21-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The period for receiving submissions must be at least 28 days.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f7acfa0f-d598-48fc-ab50-5495a30f486a" id="sec.21-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Without limiting what may be dealt with in a review report, a review report must have regard to goals and targets, however named, included in the waste management strategy.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a46e1864-411e-4a17-a5f6-2641f308137e" id="sec.22" provision.type="other" spent.amends="0"><no>22</no><heading guid="_4633e7f6-eb29-4590-b8e7-a28bf837035a" id="sec.22-he">Publication of review report and amending or replacement waste management strategy</heading><subclause affected.by.uncommenced="0" guid="_3e4ccd87-4fcc-4e15-ab31-75e3f055eb30" id="sec.22-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must, within a reasonable time after the period for receiving written submissions on the draft review report has ended, prepare, and publish in full on the department’s website, a final report of the review (the <defterm guid="_705a2914-9724-4a56-ab6f-7f00a0551033" id="sec.22-def.finalreviewreport" type="definition">final review report</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f953d7ed-2f59-49e8-8d8e-52b204cda272" id="sec.22-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In preparing the final review report, the chief executive must consider all submissions on the draft review report given to the chief executive under <intref check="valid" refid="sec.21" target.guid="_89d8d41d-5470-4419-8fee-96930984e07f">section 21</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5f4fb471-8809-4336-ab94-cbbdf5ab2471" id="sec.22-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The final review report must outline the findings of the review and may recommend an amendment or replacement of the waste management strategy to implement findings of the review.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_46675552-d5a7-4869-8663-bc7289434ff6" id="sec.22-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive may prepare and give to the Minister, for approval by gazette notice, a final amending or replacement waste management strategy to implement a recommendation mentioned in <intref check="valid" refid="sec.22-ssec.3" target.guid="_5f4fb471-8809-4336-ab94-cbbdf5ab2471">subsection (3)</intref> without having first prepared and consulted on a draft amending or replacement waste management strategy.</txt></block></subclause></clause></part></chapter><chapter affected.by.uncommenced="0" guid="_9d174c0e-d3d4-4fcd-b62c-7b3babd007b7" id="ch.3"><no>Chapter 3</no><heading guid="_7517c884-32eb-4aa2-a023-4c21e3987df9" id="ch.3-he">Waste levy</heading><part affected.by.uncommenced="0" guid="_d74d5932-8743-4e23-8ff8-088bab9e8813" id="ch.3-pt.1"><no>Part 1</no><heading guid="_51c654f1-2d8f-4e8d-b0b3-2a2ccce46cb1" id="ch.3-pt.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_a5f10b8c-274f-487f-a06a-e1958ef9e215" id="sec.25" provision.type="other" spent.amends="0"><no>25</no><heading guid="_1246e56c-ceb5-4fe7-8f4f-4437edfd9e3d" id="sec.25-he">Main purpose</heading><block><txt break.before="1">The main purpose of this chapter is to impose a levy on waste delivered to a levyable waste disposal site, and to allow for an exemption from the levy, or a discounted levy rate, for particular waste.</txt></block></clause><clause affected.by.uncommenced="0" guid="_5010083a-a6a1-4327-8946-4fe72cdbaedc" id="sec.26" provision.type="other" spent.amends="0"><no>26</no><heading guid="_853beb33-a615-424b-9142-1762eb0a9417" id="sec.26-he">Definitions for chapter</heading><subclause affected.by.uncommenced="0" guid="_535741ba-1efe-4dc3-9697-48178aa6201a" id="sec.26-ssec" provision.type="other"><block><txt break.before="0">In this chapter—</txt><deflist><definition affected.by.uncommenced="0" guid="_f7cf8718-7e9b-422a-81ae-ba5075c1fdaf" id="sec.26-ssec-def.activelandfillcell_"><txt break.before="1"><defterm guid="_0d27a087-671f-463b-a589-b68214ff2972" id="sec.26-ssec-def.activelandfillcell" type="definition">active landfill cell</defterm> means that part of a landfill where waste is currently being disposed of.</txt></definition><definition affected.by.uncommenced="0" guid="_ff50e551-c0dd-4589-a958-f2f78d122a96" id="sec.26-ssec-def.baddebtcredit_"><txt break.before="1"><defterm guid="_d5d6d015-18e5-49e5-8e84-38774a267479" id="sec.26-ssec-def.baddebtcredit" type="definition">bad debt credit</defterm> see <intref check="valid" refid="sec.72K" target.guid="_495ed80c-7789-4629-b81a-9e5c758c095f">section 72K</intref><intref check="valid" refid="sec.72K-ssec.1" target.guid="_11308217-c1df-402d-9398-4240d743504e">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_ac1a9088-0ef7-491b-80c6-89de5b1c7b1d" id="sec.26-ssec-def.baddebtcreditapplication_"><txt break.before="1"><defterm guid="_25cec4e1-4f08-4224-bb9b-4fe76d8f003e" id="sec.26-ssec-def.baddebtcreditapplication" type="definition">bad debt credit application</defterm> means an application made under <intref check="valid" refid="sec.72L" target.guid="_ec9d774f-c0d8-47db-b1b7-78e37a393747">section 72L</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_eaa61db0-95fe-4a6d-8165-a323ccf240d9" id="sec.26-ssec-def.disaster_"><txt break.before="1"><defterm guid="_e0271293-1a4e-4f5a-befc-6db80a59a3d0" id="sec.26-ssec-def.disaster" type="definition">disaster</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2003-091" target.version.series="19b3f01d-67ee-4e45-9102-a49dbc9c5a04" type="act"><name emphasis="yes">Disaster Management Act 2003</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.13" target.doc.id="act-2003-091" target.guid="_61fc0199-73da-40e9-8c2d-4b685b25c5cf" target.version.series="19b3f01d-67ee-4e45-9102-a49dbc9c5a04" type="act">section 13</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_0613812f-8690-40b1-b66c-e84eda1fadc0" id="sec.26-ssec-def.disastermanagementwaste_"><txt break.before="1"><defterm guid="_ce35e36d-73d3-46e9-8bc3-c5f7a027619d" id="sec.26-ssec-def.disastermanagementwaste" type="definition">disaster management waste</defterm> means waste generated by or because of a disaster that is or has been the subject of a declaration of a disaster situation under the <legref check="valid" jurisd="QLD" target.doc.id="act-2003-091" target.version.series="19b3f01d-67ee-4e45-9102-a49dbc9c5a04" type="act"><name emphasis="yes">Disaster Management Act 2003</name></legref>, but only within the limits, if any, declared by the chief executive, by publication on the department’s website, for a particular disaster.</txt></definition><definition affected.by.uncommenced="0" guid="_88575ec4-ea77-4a06-807c-b16480eb94dd" id="sec.26-ssec-def.disastersituation_"><txt break.before="1"><defterm guid="_deff8155-3d9b-419f-9b87-72876613672b" id="sec.26-ssec-def.disastersituation" type="definition">disaster situation</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2003-091" target.version.series="19b3f01d-67ee-4e45-9102-a49dbc9c5a04" type="act"><name emphasis="yes">Disaster Management Act 2003</name></legref>, schedule.</txt></definition><definition affected.by.uncommenced="0" guid="_f4a03d12-bc8f-4d34-9f13-05b7be100e08" id="sec.26-ssec-def.discountedrate_"><txt break.before="1"><defterm guid="_b194858b-e6d3-409f-84fd-8c8d953daec3" id="sec.26-ssec-def.discountedrate" type="definition">discounted rate</defterm>, for the waste levy for residue waste, see <intref check="valid" refid="sec.44" target.guid="_3ebbfc62-487a-4486-bc2a-97aeedf20ab6">section 44</intref><intref check="valid" refid="sec.44-ssec.4" target.guid="_08d7026d-913d-4eaf-8f41-bbec6284d604">(4)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_465d72ad-d688-4441-b3b0-be51aa3dbf0f" id="sec.26-ssec-def.dredgespoil_"><txt break.before="1"><defterm guid="_5b096f7a-c1bc-41cb-8638-ec5a05ba2512" id="sec.26-ssec-def.dredgespoil" type="definition">dredge spoil</defterm> means natural material that has been removed from a waterway—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_55c3aa77-eb30-4de7-886f-5d11753469fc" id="sec.26-ssec-def.dredgespoil-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for the purpose of creating, maintaining or enlarging a channel, basin, port, berth or other similar thing; or</txt></block></li><li guid="_522031ca-b471-49f7-8fd9-955588b0d39f" id="sec.26-ssec-def.dredgespoil-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to undertake flood mitigation activities in naturally occurring surface waters.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_b2496428-078f-4acd-a29c-9618c6e52fa2" id="sec.26-ssec-def.duedateforpayment_"><txt break.before="1"><defterm guid="_306b01b3-8274-4e83-9ca4-2568d2fd5ae9" id="sec.26-ssec-def.duedateforpayment" type="definition">due date for payment</defterm>, of a waste levy amount, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e9c1601f-5390-461d-976d-3ca8e62f096d" id="sec.26-ssec-def.duedateforpayment-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if an extension of time has been granted under <intref check="valid" refid="sec.72G" target.guid="_25bd7697-8f66-4737-9010-fb1b7ba7661f">section 72G</intref>, <intref check="valid" refid="sec.72H" target.guid="_26b6ee45-4fd5-46da-a05a-81b879a56db4">72H</intref> or <intref check="valid" refid="sec.72I" target.guid="_6505bdd2-75fc-49ac-b6d9-87388e13897a">72I</intref> for payment of the waste levy amount—the end of the extension; or</txt></block></li><li guid="_5495d4e2-b6ba-49ef-a836-bad0ef4c845f" id="sec.26-ssec-def.duedateforpayment-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if there is a waste levy instalment agreement in place between the chief executive and the operator of a levyable waste disposal site who owes the amount—the day provided for in the agreement; or</txt></block></li><li guid="_9c3f3354-dca3-45c0-a35d-7a44d0d20d8b" id="sec.26-ssec-def.duedateforpayment-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">otherwise—the end of the 28th day of the second month after the end of the levy period for the levyable waste disposal site of the operator who owes the amount.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_1251711d-86a1-4e88-9161-ca964057b59f" id="sec.26-ssec-def.exemptwaste_"><txt break.before="1"><defterm guid="_6ba42b8f-30de-4789-848a-04a8d9471d52" id="sec.26-ssec-def.exemptwaste" type="definition">exempt waste</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a581f8e3-adaa-4832-83ca-a740f869064b" id="sec.26-ssec-def.exemptwaste-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">disaster management waste; or</txt></block></li><li guid="_23a485f8-dd4f-4ee6-8ec0-d32fab1d2916" id="sec.26-ssec-def.exemptwaste-para1.aa" provision.type="other"><no>(aa)</no><block><txt break.before="0">serious local event waste; or</txt></block></li><li guid="_0a60f4f6-80bf-4443-9702-918c92e123d8" id="sec.26-ssec-def.exemptwaste-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">waste approved by the chief executive to be exempt waste for a particular exempt waste application; or</txt></block></li><li guid="_7e14a3c7-b06b-448e-887f-b6bdc6cbe8a1" id="sec.26-ssec-def.exemptwaste-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">1 of the following types of waste if lawfully managed and transported—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f98048de-6857-4f81-beea-04e0f14b02b4" id="sec.26-ssec-def.exemptwaste-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">waste that is any of the following and is not mixed with other types of waste—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a5c73ad9-369e-40fa-9a70-9713e09e94fc" id="sec.26-ssec-def.exemptwaste-para1.c-para2.i-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">non-friable asbestos-containing material;</txt></block></li><li guid="_2f577864-02d7-4bf3-9b15-c8b09750ba61" id="sec.26-ssec-def.exemptwaste-para1.c-para2.i-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">waste that has asbestos-containing material bonded to it;</txt></block></li><li guid="_a4b4da81-914c-42f6-9ffc-418e99766f2a" id="sec.26-ssec-def.exemptwaste-para1.c-para2.i-para3.C" provision.type="other"><no>(C)</no><block><txt break.before="0">any disposal items used during asbestos removal work including plastic sheeting and disposal tools;</txt></block></li></list></block></li><li guid="_97c1bf47-ebf8-467e-b32e-6d834d2dfa67" id="sec.26-ssec-def.exemptwaste-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">waste containing friable asbestos-containing material that has been removed by the holder of an asbestos removal licence issued under the <legref check="valid" jurisd="QLD" target.doc.id="act-2011-018" target.version.series="192711dc-f0de-4bcb-809d-080b81854cef" type="act"><name emphasis="yes">Work Health and Safety Act 2011</name> or under another licence or authority that authorises the removal of friable asbestos under a law of another State</legref>; or</txt></block></li></list></block></li><li guid="_aaff6edb-dcf2-413a-83ab-152f48c15bac" id="sec.26-ssec-def.exemptwaste-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">dredge spoil if, for dredge spoil that is acid sulfate soil, the dredge spoil has been treated in accordance with best practice environmental management, within the meaning of the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Environmental Protection Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.21" target.doc.id="act-1994-062" target.guid="_b5051acc-e257-440c-9a5d-22bab9b86068" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act">section 21</legref>, for the treatment and management of acid sulfate soils, as stated in a guideline prescribed by regulation; or</txt></block></li><li change="del" guid="_c0421019-8c4f-4646-8687-ac29784dd486-del" id="sec.26-ssec-def.exemptwaste-para1.e-del" provision.type="other"><no>(e)</no><block><txt break.before="0">clean earth; or</txt></block></li><li change="renumber" guid="_01481d38-87f8-404c-ae86-2a6aa63ed25a" id="sec.26-ssec-def.exemptwaste-para1.e" provision.type="other"><no>(<del xml:space="preserve">f</del><ins xml:space="preserve">e</ins>)</no><block><txt break.before="0">waste collected by or for the State, a local government or a plantation licensee under the <legref check="valid" jurisd="QLD" target.doc.id="act-1959-058" target.version.series="05878269-0f72-4d60-b053-3f083a8d73ea" type="act"><name emphasis="yes">Forestry Act 1959</name></legref> to remediate the results of a person having done something that may be an offence under <intref check="valid" refid="sec.103" target.guid="_88ee3b31-e48a-4927-89f5-5ffb72f072b6">section 103</intref> or <intref check="valid" refid="sec.104" target.guid="_428f4a48-281f-4088-8124-b981fb6fd86a">104</intref>; or</txt></block></li><li change="renumber" guid="_23bef276-2d61-4484-8717-de7b2aa4bf01" id="sec.26-ssec-def.exemptwaste-para1.f" provision.type="other"><no>(<del xml:space="preserve">g</del><ins xml:space="preserve">f</ins>)</no><block><txt break.before="0">other waste—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d96ad251-0de2-42ae-afa4-292a2eff6c02" id="sec.26-ssec-def.exemptwaste-para1.f-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">prescribed by regulation to be exempt waste; or</txt></block></li><li guid="_5e32ad5f-4fdd-4f4e-ac25-7a8093f0c4f5" id="sec.26-ssec-def.exemptwaste-para1.f-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">for which there is in force under this chapter a declaration by the chief executive that the waste is exempt waste.</txt></block></li></list></block></li></list></definition><definition affected.by.uncommenced="0" guid="_a62b18ef-0f3f-4f99-a0fe-afb0bcf13e50" id="sec.26-ssec-def.exemptwasteapplication_"><txt break.before="1"><defterm guid="_f0d3b5f5-9a0e-4bfb-853c-8e9f0af05ffd" id="sec.26-ssec-def.exemptwasteapplication" type="definition">exempt waste application</defterm> see <intref check="valid" refid="sec.28" target.guid="_d2cefd03-4760-4bb5-b5aa-4cc3a1ef6fd6">section 28</intref><intref check="valid" refid="sec.28-ssec.1" target.guid="_7fea4665-d1e4-43a4-8596-ae9aed05f4ee">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_08ccf1c3-8104-483f-b646-6e02fdf29791" id="sec.26-ssec-def.feedstock_"><txt break.before="1"><defterm guid="_e6f0a1e2-f5f9-4bf7-bd2c-a14460be4b87" id="sec.26-ssec-def.feedstock" type="definition">feedstock</defterm>, for a recycling activity, means the waste or other material that is to be used for the recycling activity.</txt></definition><definition affected.by.uncommenced="0" guid="_6cd4b681-1d53-4684-a03e-d8b78f0232a4" id="sec.26-ssec-def.friableasbestoscontainingmaterial_"><txt break.before="1"><defterm guid="_ff1fcdf0-24f8-4493-aa83-1df9d6668f2b" id="sec.26-ssec-def.friableasbestoscontainingmaterial" type="definition">friable asbestos-containing material</defterm> means material containing asbestos that is in powder form or that can be crumbled, pulverized or reduced to powder by hand when dry.</txt></definition><definition affected.by.uncommenced="0" guid="_d0f5dad1-1f31-4610-b515-625df3f630da" id="sec.26-ssec-def.lawfullymanagedandtransported_"><txt break.before="1"><defterm guid="_2f5f0aca-57bc-40bd-ac30-b111256bdbc2" id="sec.26-ssec-def.lawfullymanagedandtransported" type="definition">lawfully managed and transported</defterm>, for asbestos or waste containing asbestos, means managed and transported in compliance with the requirements applying, under the <legref check="valid" jurisd="QLD" target.doc.id="act-2005-048" target.version.series="a0e0f082-c057-4815-b921-264c76837ae7" type="act"><name emphasis="yes">Public Health Act 2005</name></legref> and any other Act, to its management and transport.</txt></definition><definition affected.by.uncommenced="0" guid="_f62c250b-37b8-4545-8613-a8cf395d5a29" id="sec.26-ssec-def.levyablewaste_"><txt break.before="1"><defterm guid="_f86b6c28-6182-4cac-9303-ec0633b6d204" id="sec.26-ssec-def.levyablewaste" type="definition">levyable waste</defterm> means waste, other than exempt waste, that is delivered to a levyable waste disposal site.</txt></definition><definition affected.by.uncommenced="0" guid="_786757a3-3869-4e56-906b-b7f5544de122" id="sec.26-ssec-def.levyablewastedisposalsite_"><txt break.before="1"><defterm guid="_946107c0-4f75-406b-93f1-a20e69bfe78b" id="sec.26-ssec-def.levyablewastedisposalsite" type="definition">levyable waste disposal site</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f5fb7a70-8356-4a0f-93e9-887b97a1f90f" id="sec.26-ssec-def.levyablewastedisposalsite-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">means a waste disposal site, whether under the ownership or control of the State, a local government or otherwise; but</txt></block></li><li guid="_c61b0524-89d7-4521-afdd-000213c78a75" id="sec.26-ssec-def.levyablewastedisposalsite-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">does not include a part of the waste disposal site that is a resource recovery area.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_0397fb84-21c6-4d1b-94ef-3a69a6fe7b13" id="sec.26-ssec-def.levyperiod_"><txt break.before="1"><defterm guid="_d64cae47-7f00-4330-b2a6-ee41b2a1de10" id="sec.26-ssec-def.levyperiod" type="definition">levy period</defterm>, for a levyable waste disposal site, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d5fd10af-233c-4f79-9367-dda8e32bdfab" id="sec.26-ssec-def.levyperiod-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for a <intref check="valid" refid="sec.325" target.guid="_c9b3a96d-3c81-423f-981e-08aab11a82c4">section 325</intref> small site, until 30 June 2021—either of the following periods—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cfe06832-0487-4225-ab98-35c63931d4cb" id="sec.26-ssec-def.levyperiod-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the period starting on 1 July 2019 and ending on 30 June 2020;</txt></block></li><li guid="_c67dd428-b5b6-47e8-b793-d29f656e1168" id="sec.26-ssec-def.levyperiod-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the period starting on 1 July 2020 and ending on 30 June 2021; or</txt></block></li></list></block></li><li guid="_d00a8e16-b6c9-45ea-84d4-019c86aa0318" id="sec.26-ssec-def.levyperiod-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—a month.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_abf6b0fd-8ecf-4c5a-849e-561d66ca7131" id="sec.26-ssec-def.monitoringsystem_"><txt break.before="1"><defterm guid="_2a817b69-0f77-4c93-b051-c3347f035fc0" id="sec.26-ssec-def.monitoringsystem" type="definition">monitoring system</defterm> see <intref check="valid" refid="sec.62" target.guid="_4807d1f8-c777-445d-bd82-69bf16ee0fd4">section 62</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_214e36cc-b1cc-4730-8d32-b5d5a27f8f0f" id="sec.26-ssec-def.nonfriableasbestoscontainingmaterial_"><txt break.before="1"><defterm guid="_88e51ce0-2ff9-44c0-8e6f-120f31b27398" id="sec.26-ssec-def.nonfriableasbestoscontainingmaterial" type="definition">non-friable asbestos-containing material</defterm> means any manufactured material or thing that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_051eb41e-8355-4e55-8bcb-ef48f3db572f" id="sec.26-ssec-def.nonfriableasbestoscontainingmaterial-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">contains asbestos as part of its design; but</txt></block></li><li guid="_c81447c0-c592-4c14-9891-b3a85bbfff22" id="sec.26-ssec-def.nonfriableasbestoscontainingmaterial-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">does not contain friable asbestos-containing material.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_7ce6690e-6e57-4b81-b251-250d2080a009" id="sec.26-ssec-def.nonlevyzone_"><txt break.before="1"><defterm guid="_e404a35c-8719-4bef-82c8-cb3873e1b3b5" id="sec.26-ssec-def.nonlevyzone" type="definition">non-levy zone</defterm> means the part of the State outside the waste levy zone.</txt></definition><definition affected.by.uncommenced="0" guid="_391ec8ed-6b1a-4bea-a71d-723f9b510d51" id="sec.26-ssec-def.progressivecapping_"><txt break.before="1"><defterm guid="_064732a6-0a0f-4c7f-bce3-48ef47456db4" id="sec.26-ssec-def.progressivecapping" type="definition">progressive capping</defterm> means capping of active landfill cells at a waste disposal site on a cell-by-cell basis.</txt></definition><definition affected.by.uncommenced="0" guid="_16327385-77aa-4066-be88-a0e3d69d60a2" id="sec.26-ssec-def.residuewaste_"><txt break.before="1"><defterm guid="_c1b080d4-0d1a-4d75-ad8e-af450f1db81d" id="sec.26-ssec-def.residuewaste" type="definition">residue waste</defterm> means the waste from a recycling activity that is commonly disposed of to landfill after the recoverable components have been removed from material.</txt><note guid="_edf8e978-00df-4634-bec5-d032aa9370cc" id="sec.26-ssec-def.residuewaste-note" type="example"><heading guid="_d4d21503-de9a-4ade-a128-45aed6e97abf" id="sec.26-ssec-def.residuewaste-note-he">Example of residue waste—</heading><block><txt break.before="1">In metal recycling, the residue waste is the mainly non-metal component that results from recycling products such as motor vehicles, whitegoods, televisions and computers that have reached the end of their useful life.</txt></block></note></definition><definition affected.by.uncommenced="0" guid="_aa4a6eb6-63af-455f-bb1c-9a93b97e14de" id="sec.26-ssec-def.residuewastediscountingapplication_"><txt break.before="1"><defterm guid="_082a1551-2906-4c7e-b76c-b630aad529d2" id="sec.26-ssec-def.residuewastediscountingapplication" type="definition">residue waste discounting application</defterm> see <intref check="valid" refid="sec.44" target.guid="_3ebbfc62-487a-4486-bc2a-97aeedf20ab6">section 44</intref><intref check="valid" refid="sec.44-ssec.1" target.guid="_71f34269-5c4f-40e5-a419-9ea4010ddde9">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_d7e88fc8-4de2-4599-a7ca-b5378510e397" id="sec.26-ssec-def.resourcerecoveryarea_"><txt break.before="1"><defterm guid="_86e3e332-23e8-4c89-b333-96e16d79d3c5" id="sec.26-ssec-def.resourcerecoveryarea" type="definition">resource recovery area</defterm> see <intref check="valid" refid="sec.72R" target.guid="_0acf4c39-5f4f-418c-b8a1-2abd8f6db492">section 72R</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_aaad812f-1e3b-48fb-a0a7-52370d694d35" id="sec.26-ssec-def.section325smallsite_"><txt break.before="1"><defterm guid="_d3bd01e3-c20c-4e74-a19e-cd8ec052098e" id="sec.26-ssec-def.section325smallsite" type="definition">section 325 small site</defterm> means a small site the operator of which, under <intref check="valid" refid="sec.325" target.guid="_c9b3a96d-3c81-423f-981e-08aab11a82c4">section 325</intref>, is not required to comply with the requirements of <intref check="valid" refid="sec.61" target.guid="_70b550db-f7c0-4d9e-9f5c-43a6756d09b9">section 61</intref><intref check="valid" refid="sec.61-ssec.2" target.guid="_72ada995-52a6-453a-b663-5f6459e43d3c">(2)</intref> to measure and record waste in compliance with the weight measurement criteria.</txt></definition><definition affected.by.uncommenced="0" guid="_e9ec0d6c-9218-4c27-b886-2b8121c2f978" id="sec.26-ssec-def.seriouslocalevent_"><txt break.before="1"><defterm guid="_e01f2646-9ee1-4e1e-8704-f01bd816eeeb" id="sec.26-ssec-def.seriouslocalevent" type="definition">serious local event</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c94bb035-5245-4e42-b65c-0d5f1880f1fe" id="sec.26-ssec-def.seriouslocalevent-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">A <defterm guid="_e909ca80-0b4a-4403-bc16-8797b2ce230c" type="mention">serious local event</defterm> is a serious disruption in a community, caused by the impact of an event, that requires a significant coordinated response by a local government and other entities to help the community recover from the disruption.</txt></block></li><li guid="_df309ade-c8e6-4bc8-af88-31a066dfd705" id="sec.26-ssec-def.seriouslocalevent-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">For paragraph 1—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_14b2d93d-67b3-4f96-9e0b-f62dde978f7c" id="sec.26-ssec-def.seriouslocalevent-para1.2-para2.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a serious disruption is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c47c30da-8231-4b6b-b846-96ca2f12a251" id="sec.26-ssec-def.seriouslocalevent-para1.2-para2.a-para3.i" provision.type="other"><no>(i)</no><block><txt break.before="0">loss of human life, or illness or injury to humans; or</txt></block></li><li guid="_2fcaae5a-a552-4cb8-aa78-f618670d84db" id="sec.26-ssec-def.seriouslocalevent-para1.2-para2.a-para3.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">widespread or severe property loss or damage; or</txt></block></li><li guid="_8bd58b9b-b208-410f-904d-25c834e28ba1" id="sec.26-ssec-def.seriouslocalevent-para1.2-para2.a-para3.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">widespread or severe damage to the environment; and</txt></block></li></list></block></li><li guid="_11d5dbcb-d854-4708-ad93-f989a36b92ef" id="sec.26-ssec-def.seriouslocalevent-para1.2-para2.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an event is an event under the <legref check="valid" jurisd="QLD" target.doc.id="act-2003-091" target.version.series="19b3f01d-67ee-4e45-9102-a49dbc9c5a04" type="act"><name emphasis="yes">Disaster Management Act 2003</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.16" target.doc.id="act-2003-091" target.guid="_00c6c76c-285c-4c86-9116-0c674bb7ad17" target.version.series="19b3f01d-67ee-4e45-9102-a49dbc9c5a04" type="act">section 16</legref>.</txt></block></li></list></block></li></list></definition><definition affected.by.uncommenced="0" guid="_1084e5bc-ede3-4c80-a20c-9a2fc9b94d5b" id="sec.26-ssec-def.seriouslocaleventwaste_"><txt break.before="1"><defterm guid="_7c3fa43e-3864-4faa-8495-175b1541a729" id="sec.26-ssec-def.seriouslocaleventwaste" type="definition">serious local event waste</defterm>— </txt><list number.type="manual" unnumbered.indent="0"><li guid="_ecd865dd-1ec5-4be2-95c8-04d48fb046cf" id="sec.26-ssec-def.seriouslocaleventwaste-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">means waste generated by activities in the immediate preparation for, or by or because of, a serious local event—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4f33240f-fb1a-49a6-b128-914b4e6ce0f5" id="sec.26-ssec-def.seriouslocaleventwaste-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">but only within the limits, if any, declared by the chief executive under <intref check="valid" refid="sec.27B" target.guid="_4d1169af-f6b2-4b57-9045-782572112633">section 27B</intref>, for the serious local event; and</txt></block></li><li guid="_438db772-6405-4756-956c-8d0e98b55471" id="sec.26-ssec-def.seriouslocaleventwaste-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">subject to the requirements of <intref check="valid" refid="sec.27A" target.guid="_4cd1489e-70fb-4c1a-9160-d8df12e9b548">section 27A</intref>; but</txt></block></li></list></block></li><li guid="_f19bbbb0-463d-4f05-afd6-cd644b975fab" id="sec.26-ssec-def.seriouslocaleventwaste-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">does not include waste generated by activities in general preparation for storms that are predicted or are likely to occur in a particular season each year or in anticipation of the next cyclone season.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_e64d980e-3538-4da4-a82d-f26b86593832" id="sec.26-ssec-def.smallsite_"><txt break.before="1"><defterm guid="_6a5c4779-9e7a-4f20-ae93-4ef6192d8d05" id="sec.26-ssec-def.smallsite" type="definition">small site</defterm> means a levyable waste disposal site the operator of which is required to hold an environmental authority for the disposal of 2,000 tonnes or less of waste in a year at the site.</txt></definition><definition affected.by.uncommenced="0" guid="_36a81bb6-74cb-495a-80be-a39fba5a2e80" id="sec.26-ssec-def.wastedatareturn_"><txt break.before="1"><defterm guid="_fef137de-8ab2-462d-b0cb-f6074984cc05" id="sec.26-ssec-def.wastedatareturn" type="definition">waste data return</defterm> see <intref check="valid" refid="sec.72" target.guid="_d30e771f-e48c-4292-86ed-c1b4fb7d03e1">section 72</intref><intref check="valid" refid="sec.72-ssec.1" target.guid="_ba53cadb-d2d7-444e-889c-bf6ae38c6fe8">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_b382a2c1-c7d2-46d2-a668-b1a4951acb3c" id="sec.26-ssec-def.wastelevy_"><txt break.before="1"><defterm guid="_fcf5e3f3-c923-4057-9c58-a4331137c1d5" id="sec.26-ssec-def.wastelevy" type="definition">waste levy</defterm> see <intref check="valid" refid="sec.36" target.guid="_626aee8b-abb7-485d-9bb6-2be57d974507">section 36</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_25954be9-4a62-4a3c-8458-138740daef83" id="sec.26-ssec-def.wastelevyamount_"><txt break.before="1"><defterm guid="_d332975f-e3ea-45b8-bda7-b46bc7a5b61d" id="sec.26-ssec-def.wastelevyamount" type="definition">waste levy amount</defterm> means an amount of waste levy.</txt></definition><definition affected.by.uncommenced="0" guid="_1b4f0e57-d2c8-4567-8697-7f546b3ecebd" id="sec.26-ssec-def.wastelevyinstalmentagreement_"><txt break.before="1"><defterm guid="_ca74fd27-6c6d-4f6f-9ed0-20d5e482bc7c" id="sec.26-ssec-def.wastelevyinstalmentagreement" type="definition">waste levy instalment agreement</defterm> see <intref check="valid" refid="sec.72B" target.guid="_fb40b28a-c841-4b72-b812-831af70b5018">section 72B</intref><intref check="valid" refid="sec.72B-ssec.1" target.guid="_b6265356-63ea-4a67-a3ff-d4f7a052ddd1">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_116e3a98-1e7d-4eb8-9b9d-d376c98d09f1" id="sec.26-ssec-def.wastelevyzone_"><txt break.before="1"><defterm guid="_2356dcdd-024f-47d5-a786-07ab22c5236a" id="sec.26-ssec-def.wastelevyzone" type="definition">waste levy zone</defterm> means the part of the State made up of the local government areas prescribed by regulation as provided for in this chapter.</txt></definition><definition affected.by.uncommenced="0" guid="_0b4dee6a-85c7-4432-ad1a-d8a2c2f0ee05" id="sec.26-ssec-def.weightmeasurementcriteria_"><txt break.before="1"><defterm guid="_f52cf31d-944d-480e-a9ce-83c7d4f74b3b" id="sec.26-ssec-def.weightmeasurementcriteria" type="definition">weight measurement criteria</defterm> means the weight measurement criteria prescribed by regulation.</txt></definition></deflist></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_284a0fe9-c78c-46c2-98c3-3cb9d59d4e7b" id="ch.3-pt.2"><no>Part 2</no><heading guid="_a32b1663-f552-4909-ae77-8ecbcd837c3a" id="ch.3-pt.2-he">Identifying exempt waste</heading><division affected.by.uncommenced="0" guid="_e6b42965-3474-45e5-954e-c74f7e95d71c" id="ch.3-pt.2-div.1"><no>Division 1</no><heading guid="_53b29c9d-c6b0-4677-9cf0-8c219977778d" id="ch.3-pt.2-div.1-he">Declaring limits for disaster management waste</heading><clause affected.by.uncommenced="0" guid="_47546bf1-b1a7-415c-8c78-d77adcd2fb27" id="sec.27" provision.type="other" spent.amends="0"><no>27</no><heading guid="_a4d9418b-dd9a-40b2-8263-64cc91acb235" id="sec.27-he">Chief executive may declare limits for disaster management waste</heading><subclause affected.by.uncommenced="0" guid="_f0ecfcca-2abe-4cef-88bc-89dcf53ad55f" id="sec.27-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may, by publication on the department’s website, declare limits applying to the status of waste as disaster management waste in relation to a particular disaster.</txt></block><note guid="_eae7fb51-8f7c-4249-aa8d-ed64bdfae265" id="sec.27-ssec.1-note" type="example"><heading guid="_290a2bdd-b6ef-47b2-8d9d-0420d771f603" id="sec.27-ssec.1-note-he">Examples of declared limits—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_27dddf27-37e4-4151-9b96-1cca7c7412f7" id="sec.27-ssec.1-note-para1" provision.type="other"><no>•</no><block><txt break.before="0">a declaration that waste is disaster management waste only for a stated period</txt></block></li><li guid="_46cd186a-c275-4244-8f0a-1c83be1f239a" id="sec.27-ssec.1-note-para1-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">a declaration that waste is disaster management waste only if it is disposed of at a stated site</txt></block></li><li guid="_83d03b00-d30c-4324-b7b6-40f916888ad5" id="sec.27-ssec.1-note-para1-oc.3" provision.type="other"><no>•</no><block><txt break.before="0">a declaration that, after a stated day, waste is disaster management waste only if delivered by stated entities</txt></block></li></list></block></note></subclause><subclause affected.by.uncommenced="0" guid="_8210d1c4-8bdd-48aa-99ef-4b419b05aefc" id="sec.27-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the chief executive makes a declaration under <intref check="valid" refid="sec.27-ssec.1" target.guid="_f0ecfcca-2abe-4cef-88bc-89dcf53ad55f">subsection (1)</intref>, the chief executive must take all reasonable steps to ensure that persons likely to be directly affected by the declaration are made aware of it, including, for example, by advertising in newspapers, on radio or on television.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e8e1e3d2-cfcf-40d9-a428-84d98fafb739" id="sec.27-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A declaration made under <intref check="valid" refid="sec.27-ssec.1" target.guid="_f0ecfcca-2abe-4cef-88bc-89dcf53ad55f">subsection (1)</intref> is not invalid because of a failure to comply with <intref check="valid" refid="sec.27-ssec.2" target.guid="_8210d1c4-8bdd-48aa-99ef-4b419b05aefc">subsection (2)</intref>.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_996c5432-a2a3-45c0-abe4-a7ece9f22558" id="ch.3-pt.2-div.1A"><no>Division 1A</no><heading guid="_d207ef24-f71d-4c92-bba2-412667fbb4df" id="ch.3-pt.2-div.1A-he">Serious local event waste</heading><clause affected.by.uncommenced="0" guid="_4cd1489e-70fb-4c1a-9160-d8df12e9b548" id="sec.27A" provision.type="other" spent.amends="0"><no>27A </no><heading guid="_8fedd9c8-fbbc-4726-8c7c-d0d20369a0a2" id="sec.27A-he">Notifying chief executive that waste is serious local event waste in particular circumstances</heading><subclause affected.by.uncommenced="0" guid="_a93f48e3-22e6-4510-818c-3ceb7060aeb9" id="sec.27A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the chief executive officer of a local government reasonably believes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_504296ae-f667-45aa-a337-00c3f5c6a76f" id="sec.27A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">there is or will be a serious local event in the local government’s local government area; and</txt></block></li><li guid="_de46d535-00e3-4140-9ab4-77053c83e251" id="sec.27A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an exemption from the levy on types of waste generated as a result of the serious local event and delivered to particular waste disposal sites should be allowed.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8575d625-9419-491d-9556-6260b04bce0d" id="sec.27A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive officer must notify the chief executive as soon as practicable of the following matters in relation to waste that has been or will be generated as a result of the serious local event—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7e0fa294-32fd-44e3-b333-8c9d0dd27479" id="sec.27A-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the type of waste that is to be serious local event waste;</txt></block></li><li guid="_1a7620a0-2c6c-4881-bff4-e288fe90edf5" id="sec.27A-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the waste disposal sites at which the waste will be disposed of;</txt></block></li><li guid="_a554d0ae-05e6-4eed-b3dc-3f43d0e97f04" id="sec.27A-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the period for which the waste is to be serious local event waste.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_de9e0c8c-d0a2-4722-8b9e-9f39eafa516a" id="sec.27A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The maximum period for <intref check="valid" refid="sec.27A-ssec.2" target.guid="_8575d625-9419-491d-9556-6260b04bce0d">subsection (2)</intref><intref check="valid" refid="sec.27A-ssec.2-para1.c" target.guid="_a554d0ae-05e6-4eed-b3dc-3f43d0e97f04">(c)</intref> is the period starting 7 days immediately before the serious local event starts or is predicted to start and ending 28 days after the serious local event ends.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c33175c5-3b4a-40dc-97e9-2f3cf6a44a12" id="sec.27A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the chief executive officer acts under <intref check="valid" refid="sec.27A-ssec.2" target.guid="_8575d625-9419-491d-9556-6260b04bce0d">subsection (2)</intref>, and subject to <intref check="valid" refid="sec.27B" target.guid="_4d1169af-f6b2-4b57-9045-782572112633">section 27B</intref>, the type of waste stated in the notice is serious local event waste if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_622658f4-a911-4d0d-8aad-15b3896b7e86" id="sec.27A-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">waste of that type is delivered to a stated waste disposal site during the stated period; and</txt></block></li><li guid="_4414e6e0-c7e3-49e9-9e0d-ab72f6b1972e" id="sec.27A-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the site operator of the waste disposal site does not charge for the delivery of the waste to the site.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_4d1169af-f6b2-4b57-9045-782572112633" id="sec.27B" provision.type="other" spent.amends="0"><no>27B </no><heading guid="_8813d1ab-1bce-4509-ac30-7468be94106c" id="sec.27B-he">Chief executive may declare limits for serious local event waste</heading><subclause affected.by.uncommenced="0" guid="_9f3cd23f-adc9-4590-ae50-b688393aa37b" id="sec.27B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may, by publication on the department’s website, declare limits applying to the status of waste as serious local event waste in relation to a particular serious local event.</txt></block><note guid="_485058f2-43d7-417f-a5dc-2b5b06e73c82" id="sec.27B-ssec.1-note" type="example"><heading guid="_9c67f397-949f-4436-b9e2-24b1fa6f6094" id="sec.27B-ssec.1-note-he">Examples of declared limits—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_6312ddc1-7145-4020-a3c3-3a5338fc3ef9" id="sec.27B-ssec.1-note-para1" provision.type="other"><no>•</no><block><txt break.before="0">a declaration that waste is serious local event waste only for a stated period</txt></block></li><li guid="_e3b8b84c-eedf-4de3-aa07-17af0078e79f" id="sec.27B-ssec.1-note-para1-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">a declaration that waste is serious local event waste only if it is disposed of at a stated site</txt></block></li><li guid="_71797386-246c-4b69-b273-43c15d19077f" id="sec.27B-ssec.1-note-para1-oc.3" provision.type="other"><no>•</no><block><txt break.before="0">a declaration that, after a stated day, waste is serious local event waste only if delivered by stated entities</txt></block></li></list></block></note></subclause><subclause affected.by.uncommenced="0" guid="_c3f123ba-33d8-4cba-848f-108a88b74785" id="sec.27B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the chief executive makes a declaration under <intref check="valid" refid="sec.27B-ssec.1" target.guid="_9f3cd23f-adc9-4590-ae50-b688393aa37b">subsection (1)</intref>, the chief executive must take all reasonable steps to ensure that persons likely to be directly affected by the declaration are made aware of it, including, for example, by advertising in newspapers, on radio or on television.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_99668d0e-f2af-4405-a710-6d26f7129b1a" id="sec.27B-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A declaration made under <intref check="valid" refid="sec.27B-ssec.1" target.guid="_9f3cd23f-adc9-4590-ae50-b688393aa37b">subsection (1)</intref> is not invalid merely because of a failure to comply with <intref check="valid" refid="sec.27B-ssec.2" target.guid="_c3f123ba-33d8-4cba-848f-108a88b74785">subsection (2)</intref>.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_72e7eab1-e031-4b5a-b8ca-541029ca2cef" id="ch.3-pt.2-div.2"><no>Division 2</no><heading guid="_2ac3c862-0d99-4d4d-a237-a74121673e51" id="ch.3-pt.2-div.2-he">Approval of waste as exempt waste</heading><clause affected.by.uncommenced="0" guid="_d2cefd03-4760-4bb5-b5aa-4cc3a1ef6fd6" id="sec.28" provision.type="other" spent.amends="0"><no>28</no><heading guid="_8fda4d8c-287c-477b-824c-029323c122a1" id="sec.28-he">Application for approval of waste as exempt waste</heading><subclause affected.by.uncommenced="0" guid="_7fea4665-d1e4-43a4-8596-ae9aed05f4ee" id="sec.28-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person may apply to the chief executive for approval of waste, identified in the application (an <defterm guid="_2ed05f57-08c3-4528-b053-31e1699f1538" id="sec.28-def.exemptwasteapplication" type="definition">exempt waste application</defterm>), as exempt waste.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_39837e5d-711e-4bbe-b64f-9263eb450eb6" id="sec.28-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the application may be about only 1 of the following types of waste—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_81115c2a-e344-4b99-9e4c-771dcf737cb8" id="sec.28-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">waste that has been donated to a charitable recycling entity but that can not practicably be re-used, recycled or sold;</txt></block></li><li guid="_7ad121e5-3109-4211-894a-4fe2edca2d84" id="sec.28-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">waste collected by members of the community during an organised event directed at remediating the results of a person having done something that may be an offence under <intref check="valid" refid="sec.103" target.guid="_88ee3b31-e48a-4927-89f5-5ffb72f072b6">section 103</intref> or <intref check="valid" refid="sec.104" target.guid="_428f4a48-281f-4088-8124-b981fb6fd86a">104</intref>;</txt></block></li><li guid="_8b32640c-69fc-425e-a8ef-3317e35014a5" id="sec.28-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">earth contaminated with a hazardous contaminant from land recorded in the environmental management register or contaminated land register;</txt></block></li><li guid="_f2ca347d-ca57-407c-a1f4-f0256de946a1" id="sec.28-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">waste to be used at a levyable waste disposal site for a purpose necessary for the operation of the site, including, for example, building infrastructure, temporary or daily covering, progressive capping, batter construction, final capping, profiling and site rehabilitation;</txt></block></li><li guid="_417c9ed0-ca24-470e-b383-bc0bd2a49e5f" id="sec.28-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">biosecurity waste;</txt></block></li><li guid="_db4f4d04-09da-4f2b-9f32-7f6e1762732a" id="sec.28-ssec.2-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">serious local event waste.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b20b5fe0-bb2b-49b8-936f-b44b7de12ad3" id="sec.28-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, if the application is about biosecurity waste, the application may be made only by the chief executive of the department in which the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-007" target.version.series="b1055c40-53b8-4360-8bea-49d7bc80473c" type="act"><name emphasis="yes">Biosecurity Act 2014</name></legref> is administered.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_17e8228d-d3fe-4161-b4be-29b556084a4b" id="sec.28-ssec.3A" provision.type="other"><no>(3A)</no><block><txt break.before="0">In addition, if the application is about serious local event waste, the application may be made only by the chief executive officer of the local government in whose local government area the serious local event waste was generated.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a6c2302d-aed1-4e40-947e-8fa80f7dcfe9" id="sec.28-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The application must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9c4ae9d8-4927-44cc-8a9e-6ff05dd319ad" id="sec.28-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li guid="_abf887be-d517-45b9-9996-333769a365b0" id="sec.28-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">be supported by enough information to allow the chief executive to decide the application; and</txt></block></li><li guid="_be9247aa-d7ba-43f2-b177-06caa16cf1dd" id="sec.28-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">be accompanied by the fee prescribed by regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2aa72fe8-643e-4de5-98b3-165c8aa1159a" id="sec.28-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_144ebd9a-6b1f-4602-9c2f-6be0a7b107fa" id="sec.28-ssec.5-def.biosecuritywaste_"><txt break.before="1"><defterm guid="_a11d1fb9-6650-42dc-a18d-285953ed0246" id="sec.28-ssec.5-def.biosecuritywaste" type="definition">biosecurity waste</defterm> means waste made up of matter that is subject to the operation of the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-007" target.version.series="b1055c40-53b8-4360-8bea-49d7bc80473c" type="act"><name emphasis="yes">Biosecurity Act 2014</name>.</legref></txt></definition><definition affected.by.uncommenced="0" guid="_a91e6992-da89-442e-9548-c93d192ff425" id="sec.28-ssec.5-def.charitablerecyclingentity_"><txt break.before="1"><defterm guid="_d8bbf53a-bca8-4e2f-a76b-dd5cb876f5ed" id="sec.28-ssec.5-def.charitablerecyclingentity" type="definition">charitable recycling entity</defterm> means an entity that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fbbb7ced-b9eb-4f49-92a1-ef398782a0cb" id="sec.28-ssec.5-def.charitablerecyclingentity-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">operates on a not-for-profit basis; and</txt></block></li><li guid="_6e557f36-1e88-41a0-afb4-c6219586687a" id="sec.28-ssec.5-def.charitablerecyclingentity-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is registered as a charity under the <legref check="valid" jurisd="QLD" target.doc.id="act-1966-007" target.version.series="c144aafe-c245-4fcb-880e-775629999e23" type="act"><name emphasis="yes">Collections Act 1966</name></legref>; and</txt></block></li><li guid="_70f1aec6-9e05-4481-812a-a5860878a3ef" id="sec.28-ssec.5-def.charitablerecyclingentity-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">is a Deductible Gift Recipient for the purposes of laws administered by the Australian Taxation Office of the Commonwealth; and</txt></block></li><li guid="_6794ddda-79dc-46ef-882f-6d43d2d347a8" id="sec.28-ssec.5-def.charitablerecyclingentity-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">actively and consistently operates a recycling or re-use program for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_96ae61c2-6600-49e3-83dd-aa26777ab2b7" id="sec.28-ssec.5-def.charitablerecyclingentity-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">providing emergency assistance; or</txt></block></li><li guid="_36dc8e62-7e48-4496-a51c-feece2b31558" id="sec.28-ssec.5-def.charitablerecyclingentity-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">otherwise supporting the charitable purposes of the entity.</txt></block></li></list></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_406ef9be-65cc-4412-8077-b1883b0f7bf3" id="sec.29" provision.type="other" spent.amends="0"><no>29</no><heading guid="_b0de80d7-4dec-43ab-b611-54f5e3b6a516" id="sec.29-he">Chief executive may require additional information or documents</heading><subclause affected.by.uncommenced="0" guid="_35e7750f-5f5e-4d9c-af53-1f97603f48e3" id="sec.29-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Within 28 days after receiving an exempt waste application, the chief executive may, by notice given to the applicant, require the applicant to give the chief executive further reasonable information or documents about the application by a reasonable day stated in the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2a5c9889-fc6a-477d-abc5-342d5aa14448" id="sec.29-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The applicant may, before the stated day, agree with the chief executive about extending the time for providing the further information or documents.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_26198598-8e7d-4793-bcce-44469e6eb48f" id="sec.29-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The application is taken to be withdrawn if the applicant does not give the chief executive the further information or documents by the stated day or the end of any extension agreed between the chief executive and the applicant.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_782338c7-ba47-41d5-a3bc-417b3dab7440" id="sec.30" provision.type="other" spent.amends="0"><no>30</no><heading guid="_f3052413-adcd-40aa-92fa-23f773602806" id="sec.30-he">Deciding application</heading><subclause affected.by.uncommenced="0" guid="_ec971382-4260-42c2-9e80-71fb0d93e4c3" id="sec.30-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must decide either to grant or to refuse an exempt waste application within 28 days after the later of the following days—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3275ed6d-097b-4274-9280-dde9ee21afa1" id="sec.30-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the day the chief executive receives the application;</txt></block></li><li guid="_735338ba-6dd7-488c-83f1-eee2722a240b" id="sec.30-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if additional information or documents are requested under <intref check="valid" refid="sec.29" target.guid="_406ef9be-65cc-4412-8077-b1883b0f7bf3">section 29</intref>—the day the chief executive receives the information or documents.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9d355595-7dfb-42af-859d-f798deec1413" id="sec.30-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In deciding the application, the chief executive must consider—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_77eb65ea-608e-4211-8982-3a483b3c9445" id="sec.30-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the objects of this Act; and</txt></block></li><li guid="_781e4202-5523-452e-913e-334cf5c3380b" id="sec.30-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the information outlined in the application.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_54b6b2be-6db7-4bd8-9e1c-17c08a4e4f96" id="sec.30-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the chief executive must refuse the application in the circumstances prescribed by regulation. </txt></block></subclause><subclause affected.by.uncommenced="0" guid="_abdc2102-f5d7-4568-8d53-0bd965301ef7" id="sec.30-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A failure to make a decision within the period required is taken to be a decision by the chief executive to refuse the application.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a3db25b3-8e0e-4f62-9db4-5cb3671fb1a1" id="sec.31" provision.type="other" spent.amends="0"><no>31</no><heading guid="_4a3bd11e-8734-4bef-a598-da8450b2bb8c" id="sec.31-he">Grant of application</heading><subclause affected.by.uncommenced="0" guid="_ad99d3fc-ad04-474b-a711-86a1fbae6637" id="sec.31-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the chief executive grants an exempt waste application, the chief executive must, within 5 business days after granting the application, give the applicant notice of the approval stating the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5c0e4d8d-602d-4cb9-a533-ae03599e4f4b" id="sec.31-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the application has been granted;</txt></block></li><li guid="_3d88415b-28de-4d30-a2c3-ea21682851c0" id="sec.31-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the waste that has been approved as exempt waste;</txt></block></li><li guid="_ea96164d-bd87-4009-b66a-9c047f6a251f" id="sec.31-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the period of the approval;</txt></block></li><li guid="_b78e553f-47d8-4359-8b4b-c01fc482bc69" id="sec.31-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">any conditions imposed on the approval.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_008361e7-ecc5-4123-a245-da3bd96971bb" id="sec.31-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The period of the approval must not be more than 3 years.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e2dfcf0a-1826-4d8e-ac2f-7043028674ee" id="sec.31-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the chief executive imposes a condition on the approval that is not the same, or substantially the same, as a condition agreed to or asked for by the applicant, the notice must also include or be accompanied by an information notice for the decision to impose the condition.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c6f9f8b4-5fa1-4e96-b495-bf159eb5ed95" id="sec.32" provision.type="other" spent.amends="0"><no>32</no><heading guid="_462de307-e5ce-408f-81c2-c98feab749e1" id="sec.32-he">Refusal of application</heading><block><txt break.before="1">If the chief executive refuses an exempt waste application, the chief executive must, within 5 business days after refusing the application, give the applicant an information notice for the decision.</txt></block></clause><clause affected.by.uncommenced="0" guid="_3d2eff80-ce7b-478f-8c4f-756c2c82d619" id="sec.33" provision.type="other" spent.amends="0"><no>33</no><heading guid="_a7feff85-8e43-4227-8376-c003eaa25c0c" id="sec.33-he">Amendment of approval by agreement</heading><subclause affected.by.uncommenced="0" guid="_68c31696-13d6-4341-9ae2-3b62b028a1cc" id="sec.33-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may amend an approval of waste as exempt waste by agreement between the chief executive and the holder of the approval.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2ee13cf1-74bf-4ba4-bba7-c305c51e030d" id="sec.33-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the holder of the approval asks for the amendment, the request must be accompanied by the fee prescribed by regulation.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2aa5933f-cad6-417d-8f16-1f18b9cdc883" id="sec.34" provision.type="other" spent.amends="0"><no>34</no><heading guid="_3d306e64-c04a-4dcd-b55f-8363f396b636" id="sec.34-he">Cancellation or amendment of approval by chief executive</heading><subclause affected.by.uncommenced="0" guid="_fb89117a-e1de-42c2-b2b9-2a59b6e549eb" id="sec.34-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may cancel or amend an approval of waste as exempt waste if the chief executive considers there are reasonable grounds to cancel or amend it.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9a81fd6a-5190-413a-9bf1-f3a7df1fb6c0" id="sec.34-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.34-ssec.1" target.guid="_fb89117a-e1de-42c2-b2b9-2a59b6e549eb">subsection (1)</intref>, the grounds for cancelling or amending the approval may include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a272a58a-8a2a-4c30-be3c-7d7bc7b2c631" id="sec.34-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that the chief executive is satisfied there is a reasonable suspicion that the granting of the approval was based on incorrect information; and</txt></block></li><li guid="_d6b2c4e9-a190-4b94-8313-3d0ac5fcc74d" id="sec.34-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that the chief executive is satisfied there is a reasonable suspicion that the approval was granted because of a false or misleading representation or declaration; and</txt></block></li><li guid="_ebfe4977-2c8b-4221-b58b-de9abb4e1fe2" id="sec.34-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that the circumstances relevant to the granting of the approval have changed; and</txt></block></li><li guid="_3351d53d-1d99-49d8-b6c6-c06101d745d5" id="sec.34-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">that the approval has not been complied with; and</txt></block></li><li guid="_841b38ed-b973-4310-bb5d-a3556b53bb08" id="sec.34-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">that it is desirable to cancel or amend the approval having regard to the objects of this Act.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_eeb00b58-3aa6-425e-a292-3abfea0d6866" id="sec.34-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Before cancelling or amending the approval (the <defterm guid="_9d08bd2e-b82e-4a95-979b-0585d6fec012" id="sec.34-def.proposedaction" type="definition">proposed action</defterm>), the chief executive must give the holder of the approval a notice stating the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_59cb35d4-1762-4ede-877a-f4bf99554c95" id="sec.34-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the proposed action;</txt></block></li><li guid="_9dbea399-d085-414e-82b9-cddd5f59e587" id="sec.34-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the grounds for taking the proposed action;</txt></block></li><li guid="_dc39ef4e-0949-4ea7-bee9-0f60f51211fb" id="sec.34-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the facts and circumstances that form the basis for the grounds;</txt></block></li><li guid="_0f4f0dbf-1b06-4f4b-88ca-fc51eab1d63f" id="sec.34-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">when the proposed action is intended to take effect;</txt></block></li><li guid="_e34390e1-67ce-4591-8d34-c7152f987ebb" id="sec.34-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">that the holder may make, within a stated period, written submissions to show why the proposed action should not be taken.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_cbbbcfa9-666d-4948-9b53-c6afad8c6a1f" id="sec.34-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The stated period for submissions must not end earlier than 21 days after the holder of the approval is given the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_da5f3010-9a9f-4fbc-8a29-980555ed39bd" id="sec.34-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The chief executive must consider all submissions made under <intref check="valid" refid="sec.34-ssec.3" target.guid="_eeb00b58-3aa6-425e-a292-3abfea0d6866">subsection (3)</intref><intref check="valid" refid="sec.34-ssec.3-para1.e" target.guid="_e34390e1-67ce-4591-8d34-c7152f987ebb">(e)</intref> within the stated period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_464071a1-2439-455c-8d01-b1d219a9bb27" id="sec.34-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">If the chief executive decides to take the proposed action, the chief executive must, within 10 business days after making the decision, give the holder of the approval an information notice for the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5a4bcd68-6be4-4054-8413-7cab8893cdda" id="sec.34-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">The decision takes effect when the holder is given the information notice.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_9ce0bf9a-095b-4404-b0e4-70ed65475627" id="ch.3-pt.2-div.3"><no>Division 3</no><heading guid="_f21e16d1-3157-4982-9dd7-d616c9632379" id="ch.3-pt.2-div.3-he">Declaring waste to be exempt waste</heading><clause affected.by.uncommenced="0" guid="_0b0edab5-517b-4571-8922-999109f03bb4" id="sec.35" provision.type="other" spent.amends="0"><no>35</no><heading guid="_330db46c-da83-4c1d-8b8f-32ec73455e40" id="sec.35-he">Chief executive may declare waste to be exempt waste in exceptional circumstances</heading><subclause affected.by.uncommenced="0" guid="_8e55b0b5-5596-4b49-95f8-b2f8f6892cb3" id="sec.35-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the chief executive is satisfied that exceptional circumstances apply for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fdb30224-5568-4297-9a06-d5766c8d3380" id="sec.35-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">particular waste or a type of waste; or</txt></block></li><li guid="_1807bea4-25ab-4c3a-87c8-9a0c6a610184" id="sec.35-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the disposal of particular waste or a type of waste.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6dfad4e8-5130-417f-9c68-d926ae0f8e37" id="sec.35-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may, by publication on the department’s website, declare the waste to be exempt waste.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_91751c22-6475-417c-a6ec-27f9ad49c1c0" id="sec.35-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive may declare waste to be exempt waste subject to any limits or conditions included in the declaration of the waste as exempt waste.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_577a9d31-adf3-4c7f-9a35-2c155be4b6a5" id="sec.35-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A declaration of waste as exempt waste has effect subject to any limits or conditions included in the declaration.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_3bf69331-372d-4be0-b604-01a0f99f4b82" id="ch.3-pt.3"><no>Part 3</no><heading guid="_d9b2629f-d55a-4258-9372-4045892f7620" id="ch.3-pt.3-he">Operation of waste levy</heading><clause affected.by.uncommenced="0" guid="_626aee8b-abb7-485d-9bb6-2be57d974507" id="sec.36" provision.type="other" spent.amends="0"><no>36</no><heading guid="_1bce2a5c-314c-4693-9ce0-c90f6e8bbe49" id="sec.36-he">Imposition of waste levy</heading><block><txt break.before="1">The operator of a levyable waste disposal site is liable to pay the State a levy (the <defterm guid="_749b29eb-74eb-488a-904f-7a59481b99a9" id="def.wastelevy" type="definition">waste levy</defterm>) on all levyable waste that is delivered to the site if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b7dadf94-308b-4d7f-990b-95666d8c48d5" id="sec.36-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the levyable waste disposal site is in the waste levy zone; or</txt></block></li><li guid="_d2f3c820-77b7-4cbb-9d90-68361f4a0eb3" id="sec.36-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the levyable waste disposal site is in the non-levy zone and the waste was generated outside the non-levy zone. </txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_0780610c-0bdd-40b1-84cc-613adb35e20a" id="sec.37" provision.type="other" spent.amends="0"><no>37</no><heading guid="_a85b49a3-1406-4f40-8ef8-483d96ebcfb4" id="sec.37-he">Calculating waste levy amount</heading><subclause affected.by.uncommenced="0" guid="_ad0b8455-f222-4556-a6c9-b7246fb88b44" id="sec.37-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The rate of the waste levy for each type of waste is the rate prescribed by regulation for that type.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d0d9c57a-c38f-4788-9a08-eccb24556f0d" id="sec.37-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The amount of waste levy imposed on waste is calculated in compliance with the requirements prescribed by regulation.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d9f9a129-e415-459a-b7ef-1b4ae2542291" id="sec.38" provision.type="other" spent.amends="0"><no>38</no><heading guid="_b94ea967-a65d-4f0f-abbb-93ffde4514ce" id="sec.38-he">Offence to remove waste from levyable waste disposal site in particular circumstances</heading><block><txt break.before="1">The operator of a levyable waste disposal site must not, for sale or other commercial gain, remove from the site waste for which the waste levy was, or is to be, paid to the State.</txt><penalty guid="_b41d44e9-0afe-4885-8e91-60569dd5b502" id="sec.38-pen"><block><txt break.before="1">Maximum penalty—50 penalty units.</txt></block></penalty></block></clause><clause affected.by.uncommenced="0" guid="_cb50d85b-ea0a-4236-8ee1-3df26e5c2d31" id="sec.39" provision.type="other" spent.amends="0"><no>39</no><heading guid="_b8259dc5-1cd6-40b7-bb38-dc7226d062f0" id="sec.39-he">When residue waste taken to be generated outside the non-levy zone</heading><block><txt break.before="0">If waste, used as feedstock for a recycling activity, was generated outside the non-levy zone, all of the residue waste generated by the recycling activity is taken, for this chapter, to be generated outside the non-levy zone.</txt></block></clause><clause affected.by.uncommenced="0" guid="_1912a421-82af-48e9-ac38-805ff299edc6" id="sec.40" provision.type="other" spent.amends="0"><no>40</no><heading guid="_e004e54e-6069-4dc5-b77b-fb206ac79a43" id="sec.40-he">Mixing waste generated outside non-levy zone with waste generated in the non-levy zone</heading><subclause affected.by.uncommenced="0" guid="_e6652b56-9160-4f0a-aab0-e5dac08c4e78" id="sec.40-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if waste generated outside the non-levy zone is mixed with waste generated in the non-levy zone before being delivered to a levyable waste disposal site in the non-levy zone.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f2b9e1eb-4977-4ad7-9225-866daf82c199" id="sec.40-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive and the person who mixed the waste may agree in writing to a method of working out the waste that is taken to have been generated outside the non-levy zone and the total amount of that waste.</txt></block><note guid="_ed13633b-563a-4066-8d75-c978a049fe16" id="sec.40-ssec.2-note" type="example"><heading guid="_853d338a-0439-4a24-8864-b1f3fb7f5c36" id="sec.40-ssec.2-note-he">Example—</heading><block><txt break.before="1">Fifty tonnes of waste generated outside the non-levy zone and 3,000 tonnes of waste generated in the non-levy zone are delivered to a resource recovery area in the non-levy zone in a month where they are mixed in a stockpile. Typically, 60% of waste delivered to the resource recovery area is delivered to the levyable waste disposal site. The chief executive and the operator of the relevant site agree that the first 30 tonnes of waste delivered from the resource recovery area to the levyable waste disposal site in the following month is taken to be waste generated outside the non-levy zone.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_7f5cf9ca-cf7f-4653-837e-84a3298bfa81" id="sec.40-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For this chapter— </txt><list number.type="manual" unnumbered.indent="0"><li guid="_f14a9bb2-08f6-4aac-9e12-6bcbfe5d6f0b" id="sec.40-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if there is an agreement under <intref check="valid" refid="sec.40-ssec.2" target.guid="_f2b9e1eb-4977-4ad7-9225-866daf82c199">subsection (2)</intref>—the mixed waste is taken to be generated as decided under the agreement; or</txt></block></li><li guid="_13dd361c-571c-47c3-843b-8644daed88cd" id="sec.40-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—all the mixed waste is taken to have been generated outside the non-levy zone from the time the waste was mixed.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_97156bb4-76dd-4889-b66f-174e591a77e1" id="sec.41" provision.type="other" spent.amends="0"><no>41</no><heading guid="_a1e38b22-2579-4d18-beed-6249dcb8ccbb" id="sec.41-he">Mixing types of waste that attract different rates of waste levy</heading><subclause affected.by.uncommenced="0" guid="_bdffbab1-5b50-4812-8045-495f45d97a4f" id="sec.41-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d3b56ce2-d65d-4503-8edf-142659607e07" id="sec.41-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">different types of waste are mixed before being delivered to a levyable waste disposal site; and</txt></block></li><li guid="_e871323a-e198-41c6-acc8-86a5bab8c2ba" id="sec.41-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the different types of waste attract different rates of waste levy.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1e2b59a1-5685-4d90-be7a-ea973770e81a" id="sec.41-ssec.1A" provision.type="other"><no>(1A)</no><block><txt break.before="0">For <intref check="valid" refid="sec.41-ssec.1" target.guid="_bdffbab1-5b50-4812-8045-495f45d97a4f">subsection (1)</intref><intref check="valid" refid="sec.41-ssec.1-para1.b" target.guid="_e871323a-e198-41c6-acc8-86a5bab8c2ba">(b)</intref>, the rate of the waste levy for exempt waste is taken to be zero.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_50ce53b8-f446-433e-9d4a-dcbe16d45db9" id="sec.41-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">All of the waste delivered is taken to attract the highest rate of waste levy that applies to any of the types of waste.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_58ddcdbe-ae06-4c12-995a-22ec6e2e8486" id="sec.42" provision.type="other" spent.amends="0"><no>42</no><heading guid="_6d43e69a-74e0-411c-89e0-d2263eba67a7" id="sec.42-he">Mixing types of waste that attract same rate of waste levy</heading><subclause affected.by.uncommenced="0" guid="_bd411dc8-0aec-4350-ad90-7d248a6ca556" id="sec.42-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_78778037-df51-4712-90b8-51ae3ef893bd" id="sec.42-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">different types of waste are mixed before being delivered to a levyable waste disposal site; and</txt></block></li><li guid="_8d74b2fc-8702-462e-995a-2feefe7f4224" id="sec.42-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the different types of waste attract the same rate of waste levy.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3a45cdc0-bdb3-4195-8fc6-0f2b1029fca9" id="sec.42-ssec.1A" provision.type="other"><no>(1A)</no><block><txt break.before="0">For <intref check="valid" refid="sec.42-ssec.1" target.guid="_bd411dc8-0aec-4350-ad90-7d248a6ca556">subsection (1)</intref><intref check="valid" refid="sec.42-ssec.1-para1.b" target.guid="_8d74b2fc-8702-462e-995a-2feefe7f4224">(b)</intref>, the rate of the waste levy for exempt waste is taken to be zero.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_11601c2f-cd17-434e-9b57-699305832881" id="sec.42-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The operator of the site must, for <intref check="valid" refid="sec.60" target.guid="_6b758c45-59e4-4c54-a187-7dd0e64f5df2">sections 60</intref> and <intref check="valid" refid="sec.61" target.guid="_70b550db-f7c0-4d9e-9f5c-43a6756d09b9">61</intref>, make a reasonable estimate of the amount of each type of waste included in the mixed waste using the information given to the operator under <intref check="valid" refid="sec.53" target.guid="_f86b8d4b-010d-4c7b-83cf-00c6cb4be065">section 53</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_473266b3-474c-4734-9eb0-1c3ee79516eb" id="sec.43" provision.type="other" spent.amends="0"><no>43</no><heading guid="_f8126a41-ba6f-45c3-ae21-dbbbf646bf7f" id="sec.43-he">Regulation identifying waste levy zone</heading><subclause affected.by.uncommenced="0" guid="_b6572f3f-a53a-4cc3-90c4-11b7c6a3ddd5" id="sec.43-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A regulation may identify local government areas that make up the waste levy zone.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_55d28350-4231-46a9-997e-e9dbf0a0cb51" id="sec.43-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">To remove any doubt, it is declared that it is not necessary for the waste levy zone to be made up of only local government areas that are contiguous with other local government areas.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_e24fd547-58ff-4e2e-9d73-08552be41811" id="ch.3-pt.4"><no>Part 4</no><heading guid="_8f2ec033-8861-4da4-9f50-71f5e45e85d1" id="ch.3-pt.4-he">Discounting waste levy for residue waste</heading><clause affected.by.uncommenced="0" guid="_3ebbfc62-487a-4486-bc2a-97aeedf20ab6" id="sec.44" provision.type="other" spent.amends="0"><no>44</no><heading guid="_b6cc3ea7-ede7-4473-93a6-6744612f3448" id="sec.44-he">Application for discounted rate for waste levy for residue waste</heading><subclause affected.by.uncommenced="0" guid="_71f34269-5c4f-40e5-a419-9ea4010ddde9" id="sec.44-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person who conducts a recycling activity prescribed by regulation may apply to the chief executive for approval of a discounted rate for the waste levy for residue waste identified in the application (a <defterm guid="_2a1491c1-43b6-4586-9415-d9ef1b79abd9" id="sec.44-def.residuewastediscountingapplication" type="definition">residue waste discounting application</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_441d985b-0f6a-4cba-af5d-b09ee37fa422" id="sec.44-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5c185136-de17-4bdf-bfeb-129a18f231c1" id="sec.44-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li guid="_7e6fab8d-aa02-4568-b174-5d674f1cd8dc" id="sec.44-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">be supported by enough information to allow the chief executive to decide the application; and</txt></block></li><li guid="_4690b5dd-bace-4653-ae1f-c5a808a138bf" id="sec.44-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">be accompanied by the fee prescribed by regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_10203a86-e7dc-4ea0-9e40-6d2dfad94854" id="sec.44-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister may recommend to the Governor in Council the making of a regulation under <intref check="valid" refid="sec.44-ssec.1" target.guid="_71f34269-5c4f-40e5-a419-9ea4010ddde9">subsection (1)</intref> about a particular recycling activity only if the Minister is satisfied that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_19a4c69e-a076-44c4-90c4-8b6976d8a656" id="sec.44-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0"> giving a discount on the waste levy for residue waste from the activity will have a significant impact on the activity becoming established and sustained in Queensland; and</txt></block></li><li guid="_e34db8f1-1579-43e7-99e1-1d9edeea1953" id="sec.44-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0"> the activity optimises the market and material value that can be derived from the waste used as feedstock for the activity.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_08d7026d-913d-4eaf-8f41-bbec6284d604" id="sec.44-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The <defterm guid="_b3c12972-244b-4d41-9709-919c3428fc0b" id="sec.44-def.discountedrate" type="definition">discounted rate</defterm> for the waste levy for residue waste is the rate prescribed by regulation.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a82da1dd-ba24-4d90-a2d1-32190b3bd74c" id="sec.45" provision.type="other" spent.amends="0"><no>45</no><heading guid="_7bb5d147-39d3-435d-82e5-6e78accd6ed3" id="sec.45-he">Chief executive may require additional information or documents</heading><subclause affected.by.uncommenced="0" guid="_684c2aa4-ea14-45c1-80d1-dd4ad52a014a" id="sec.45-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Within 28 days after receiving a residue waste discounting application, the chief executive may, by notice given to the applicant, require the applicant to give the chief executive further reasonable information or documents about the application by a reasonable day stated in the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_81f71b8f-ff2f-462c-903d-4e6a94f29ae5" id="sec.45-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The applicant may, before the stated day, agree with the chief executive about extending the time for providing the further information or documents.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3642a93e-9870-4f54-b6c3-a92621cbdb60" id="sec.45-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The application is taken to be withdrawn if the applicant does not give the chief executive the further information or documents by the stated day or the end of any extension agreed between the chief executive and the applicant.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8f440a31-fcee-47b9-8142-a3c11a79db67" id="sec.46" provision.type="other" spent.amends="0"><no>46</no><heading guid="_6a92aea9-6e90-4525-bb3c-dbe4f2d71513" id="sec.46-he">Deciding application</heading><subclause affected.by.uncommenced="0" guid="_eae79b5f-80fe-47e9-92b3-2177fd2cf70f" id="sec.46-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must decide either to grant or to refuse a residue waste discounting application within 28 days after the later of the following days—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_18a6b00f-0f69-4d06-9ffd-039fff151997" id="sec.46-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the day the chief executive receives the application;</txt></block></li><li guid="_27f193ae-ab84-4427-85d5-cd89f694afc2" id="sec.46-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if additional information or documents are requested under <intref check="valid" refid="sec.45" target.guid="_a82da1dd-ba24-4d90-a2d1-32190b3bd74c">section 45</intref>—the day the chief executive receives the information or documents.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c6a9b6e9-6478-4799-8fd0-62dcebb4256f" id="sec.46-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In deciding the application, the chief executive must consider all of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3faf8080-ee2d-4519-97d6-da5052e97816" id="sec.46-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the objects of this Act;</txt></block></li><li guid="_f5bc5b68-a980-4002-a312-39a86f5f715f" id="sec.46-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the information included in the application;</txt></block></li><li guid="_02e0ccb9-50fb-44e2-9506-b93b63ff7256" id="sec.46-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">any criteria prescribed by regulation;</txt></block></li><li guid="_0307d7a7-1948-40ed-9bdc-e50068c83b01" id="sec.46-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the applicant’s history of compliance with this Act and the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Environmental Protection Act</name></legref>, including whether the applicant holds any licences, environmental authorities or other approvals for conducting the recycling activity.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_fb58c2bd-c87a-471d-8291-7981b7866280" id="sec.46-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the chief executive must refuse the application in the circumstances prescribed by regulation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_53dbd749-68b0-4f27-8c88-45483eccedaf" id="sec.46-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A failure to make a decision within the period required is taken to be a decision by the chief executive to refuse the application.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_53996ff3-de53-411b-a176-1c73f8c69fe9" id="sec.47" provision.type="other" spent.amends="0"><no>47</no><heading guid="_2e96ad95-4bf5-47d0-9e4f-5529d0ecc9bf" id="sec.47-he">Grant of application</heading><subclause affected.by.uncommenced="0" guid="_38caa60c-e284-4c78-af4f-df1b602194b6" id="sec.47-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the chief executive grants a residue waste discounting application—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ac36b658-8217-44e7-ac5c-0429dc2ad3d7" id="sec.47-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in addition to any other conditions, the chief executive must impose a condition on the approval either—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0df518ed-b1ea-42a9-9d60-ed9cd5d38cb8" id="sec.47-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0"> requiring the applicant to maintain as a minimum a stated recycling efficiency; or</txt></block></li><li guid="_cb3cb5ff-a2f2-4796-bf2f-17fadfdab692" id="sec.47-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0"> limiting the amount of residue waste that will attract the discount rate in a period, including, for example, as a stated proportion of the amount of waste used as feedstock for the recycling activity in the period; and</txt></block></li></list></block></li><li guid="_5a36f858-90a6-4a89-a016-a2157ab22ea0" id="sec.47-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">within 5 business days, the chief executive must give the applicant a notice stating the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_57ba7f5d-1e59-4f0d-9b19-ae2a5f96b1ee" id="sec.47-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the application has been granted;</txt></block></li><li guid="_272d8219-e0cf-4eb5-a56a-d7412bd9b336" id="sec.47-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the discounted rate for the waste levy for the residue waste identified in the application;</txt></block></li><li guid="_3a23d934-09c3-4b86-83d0-db226b40455a" id="sec.47-ssec.1-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the period of the approval;</txt></block></li><li guid="_6c9175d6-f177-48fd-a0ad-55b01904e211" id="sec.47-ssec.1-para1.b-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">any conditions imposed on the approval or prescribed by regulation.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_29604144-811f-4e3c-b3cc-9aca5f54acff" id="sec.47-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The period of the approval must not—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bd69a965-93dd-4c58-9331-97918735d541" id="sec.47-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be more than 3 years; or</txt></block></li><li guid="_1a15b1af-77cc-45e4-b264-f7db05042822" id="sec.47-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">end after the residue waste discounting review date.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_059e3290-7d64-4b96-a19e-2a872cba4ff8" id="sec.47-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The notice must also include or be accompanied by an information notice for the decision to impose a condition on the approval unless the condition is the same, or substantially the same, as a condition agreed to or asked for by the applicant.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_874377f5-c39d-4e77-a2b2-a9fa525bb3ec" id="sec.47-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In addition to any conditions imposed by the chief executive, the approval is also subject to the conditions prescribed by regulation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ba5c1b44-94f3-4764-a5c8-00869bb71206" id="sec.47-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_ad258958-4860-41c2-bfee-0775391dc6ce" id="sec.47-ssec.5-def.recyclingefficiency_"><txt break.before="1"><defterm guid="_27d5c0f8-9bd2-4a6a-9f5b-87afdd3b71c8" id="sec.47-ssec.5-def.recyclingefficiency" type="definition">recycling efficiency</defterm> means a percentage of the feedstock for a recycling activity that is not disposed of as landfill as a result of the activity.</txt></definition><definition affected.by.uncommenced="0" guid="_7040c33c-b18f-4c81-a9c4-0528d7117828" id="sec.47-ssec.5-def.residuewastediscountingreviewdate_"><txt break.before="1"><defterm guid="_601c2687-775d-4932-8536-7a9bad291928" id="sec.47-ssec.5-def.residuewastediscountingreviewdate" type="definition">residue waste discounting review date</defterm> means the day, as prescribed by regulation, for the review by the chief executive of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3ee8c7f1-094b-4212-8e27-953ada88a927" id="sec.47-ssec.5-def.residuewastediscountingreviewdate-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the discounted rate for the waste levy for the residue waste;</txt></block></li><li guid="_86adaa6c-fad8-41bb-adb6-d030f95e88f1" id="sec.47-ssec.5-def.residuewastediscountingreviewdate-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the recycling efficiency threshold for recycling activities;</txt></block></li><li guid="_29d3ac2b-d19d-4871-8803-6c6a6a27fbc2" id="sec.47-ssec.5-def.residuewastediscountingreviewdate-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">any other matters mentioned in this part as being prescribed by regulation.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e8f4cbd4-ab53-4c98-81e7-dd25b301a78b" id="sec.48" provision.type="other" spent.amends="0"><no>48</no><heading guid="_13b921af-8733-42d0-a39e-27eb10f1ac5c" id="sec.48-he">Refusal of application</heading><block><txt break.before="1">If the chief executive refuses a residue waste discounting application, the chief executive must, within 5 business days after refusing the application, give the applicant an information notice for the decision.</txt></block></clause><clause affected.by.uncommenced="0" guid="_d3a2e060-e74a-488b-b798-61594b4ed44a" id="sec.49" provision.type="other" spent.amends="0"><no>49</no><heading guid="_66d3aed1-e9f4-4bc9-8fb6-436b4e6c3964" id="sec.49-he">Amendment of approval by agreement</heading><subclause affected.by.uncommenced="0" guid="_815e14c1-0cfa-4eba-9b56-f60d47878dbe" id="sec.49-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may amend an approval of a discounted rate for the waste levy for residue waste by agreement between the chief executive and the holder of the approval.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_66bc26eb-4a1a-45ed-9781-352ded4dc6fe" id="sec.49-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the holder of the approval asks for the amendment, the request must be accompanied by the fee prescribed by regulation.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_5ac52812-8485-4e43-9656-47df0f44f166" id="sec.50" provision.type="other" spent.amends="0"><no>50</no><heading guid="_0e1e8600-3b5d-4cfd-870e-f1f34c565ea4" id="sec.50-he">Cancellation or amendment of approval by chief executive</heading><subclause affected.by.uncommenced="0" guid="_6ea511ff-f1ab-43ff-8f27-561e15b9cf52" id="sec.50-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may cancel or amend an approval of a discounted rate for the waste levy for residue waste if the chief executive considers there are reasonable grounds to cancel or amend it.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_27edeb8b-4cc8-4b6c-8d42-cb120dffb3cc" id="sec.50-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.50-ssec.1" target.guid="_6ea511ff-f1ab-43ff-8f27-561e15b9cf52">subsection (1)</intref>, the grounds for cancelling or amending the approval may include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b1add194-9b25-400f-9e49-ac1012543184" id="sec.50-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that the chief executive is satisfied there is a reasonable suspicion that the holder of the approval has not implemented strategies or practices to progressively improve the efficiency of the holder’s recycling activities during the period of the approval; and</txt></block></li><li guid="_08cd8030-be84-4a84-bec4-44fc8ac1b26b" id="sec.50-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that the chief executive is satisfied there is a reasonable suspicion that the approval was granted because of a false or misleading representation or declaration; and</txt></block></li><li guid="_7e149dcf-9238-429d-aa59-7d68bb390737" id="sec.50-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that the circumstances relevant to the granting of the approval have changed; and</txt></block></li><li guid="_60a65705-b897-438d-8891-7410309bea34" id="sec.50-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">that the conditions of the approval have not been complied with; and</txt></block></li><li guid="_087c385b-e0bd-4bdb-9255-45e4d20e56c1" id="sec.50-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">that it is desirable to cancel or amend the approval having regard to the objects of this Act.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_aebd85ab-14f6-4ee2-b3e8-7c2fd4e6fb68" id="sec.50-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Before cancelling or amending the approval (the <defterm guid="_81f3ac3b-0ad0-48df-a4c3-07c7a3e5b832" id="sec.50-def.proposedaction" type="definition">proposed action</defterm>) the chief executive must give the holder of the approval a notice stating the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4dbd7f41-a969-4eda-8a4d-84fc0fe7f49d" id="sec.50-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the proposed action;</txt></block></li><li guid="_0ec7f2ea-0aea-44ea-b6ad-3ea779d6793c" id="sec.50-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the grounds for taking the proposed action;</txt></block></li><li guid="_0fe263b6-3432-4778-847e-a22f923f7e13" id="sec.50-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the facts and circumstances that form the basis for the grounds;</txt></block></li><li guid="_986a7893-bf21-427f-8070-3013ff7c6fcc" id="sec.50-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">when the proposed action is intended to take effect;</txt></block></li><li guid="_66cfaa99-aac1-4667-9ffb-f5dc58dfa988" id="sec.50-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">that the holder of the approval may make, within a stated period, written submissions to show why the proposed action should not be taken.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_bea218f3-071c-42de-a923-b916c9887c1a" id="sec.50-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The stated period for submissions must not end earlier than 21 days after the holder of the approval is given the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1cfcf26e-0ab8-4084-b6be-c14aa03ad8b9" id="sec.50-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The chief executive must consider all submissions made under <intref check="valid" refid="sec.50-ssec.3" target.guid="_aebd85ab-14f6-4ee2-b3e8-7c2fd4e6fb68">subsection (3)</intref><intref check="valid" refid="sec.50-ssec.3-para1.e" target.guid="_66cfaa99-aac1-4667-9ffb-f5dc58dfa988">(e)</intref> within the stated period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d77232ba-5f0a-4b48-bc29-5ea45acc0f15" id="sec.50-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">If the chief executive decides to take the proposed action, the chief executive must, within 10 business days after making the decision, give the holder of the approval an information notice for the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8a8bf82f-370b-4ae6-b391-eb93c97e74a8" id="sec.50-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">The decision takes effect when the holder is given the information notice.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_de269c5d-f683-4406-a238-699c6699503a" id="sec.51" provision.type="other" spent.amends="0"><no>51</no><heading guid="_b097dc5d-47ab-45aa-b915-e116104dfdd6" id="sec.51-he">Automatic cancellation of approval</heading><block><txt break.before="1">An approval of a discounted rate for the waste levy for residue waste is automatically cancelled if the business of conducting the recycling activity relevant to the approval ceases to be owned by the entity granted the approval, including, for example, because the ownership of the business is transferred to another entity.</txt></block></clause></part><part affected.by.uncommenced="0" guid="_156dde05-c31d-47ad-a85b-453d60e42c31" id="ch.3-pt.5"><no>Part 5</no><heading guid="_86d079f4-949e-4f51-beec-358fa2560b21" id="ch.3-pt.5-he">Obligations relating to waste levy</heading><division affected.by.uncommenced="0" guid="_9acf9bdc-ceb6-4b08-b677-4cd70fd3c803" id="ch.3-pt.5-div.1"><no>Division 1</no><heading guid="_bba0b077-5d8c-471f-9aa6-a0214e51d0d4" id="ch.3-pt.5-div.1-he">Obligations of person delivering waste</heading><clause affected.by.uncommenced="0" guid="_812d5105-d30b-4c63-aaf8-dcb955b27b47" id="sec.52" provision.type="other" spent.amends="0"><no>52</no><heading guid="_65880e97-08b2-4a61-9cd5-2fa3817a80c9" id="sec.52-he">Persons delivering waste </heading><block><txt break.before="0">A person is taken to deliver waste for this division if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b0c7fc4f-a6c7-4d43-8293-9ba81665badb" id="sec.52-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the person physically delivers the waste; or</txt></block></li><li guid="_6a7326de-641b-4a0d-9b89-ccaebb5bc154" id="sec.52-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the person engages or directs another person to physically deliver the waste on behalf of the person.</txt><note guid="_26322a84-3c9e-4699-bce8-017687768a69" id="sec.52-para1.b-note" type="example"><heading guid="_90221a19-b8ec-40ba-8d29-bc407b39aaa7" id="sec.52-para1.b-note-he">Example—</heading><block><txt break.before="1">If an employee delivers waste to a levyable waste disposal site on behalf of the employee’s employer, the obligations under this division apply to both the employee and the employer.</txt></block></note></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_f86b8d4b-010d-4c7b-83cf-00c6cb4be065" id="sec.53" provision.type="other" spent.amends="0"><no>53</no><heading guid="_b781fb41-90e5-4a1f-8120-67e816407f4c" id="sec.53-he">Person delivering waste to waste disposal site to give information</heading><subclause affected.by.uncommenced="0" guid="_201fcd0d-8d89-414a-91c0-1101734d696f" id="sec.53-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a person delivers waste to a waste disposal site.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5a8388b6-2afa-49de-b2a2-391f931857d4" id="sec.53-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The person must give the operator of the waste disposal site the information (the <defterm guid="_81ebd79a-aa59-4f21-bbc3-7976cdaa8380" id="sec.53-def.deliveryinformation" type="definition">delivery information</defterm>) that the operator reasonably requires to identify—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d55b7d5f-3e29-4ad6-b9a1-6b01871d1386" id="sec.53-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">how much of the waste is exempt waste and how much of it is levyable waste; and</txt></block></li><li guid="_732f01da-2bc3-40c2-ae4d-678e2d7063e3" id="sec.53-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for each type of waste required to be measured by the operator under <intref check="valid" refid="sec.59" target.guid="_753c71b4-2d8f-457c-9d00-64ab00810913">section 59</intref>—how much waste there is; and</txt></block></li><li guid="_f207d614-f399-4a0e-b803-450a66c06969" id="sec.53-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">whether the waste was generated in the waste levy zone, the non-levy zone or outside Queensland.</txt></block></li></list></block><penalty guid="_39d65915-4222-48b3-9cec-9fbfb34c7342" id="sec.53-ssec.2-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_c0dde610-b7af-40bb-ab4e-d429c822dc14" id="sec.53-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, the delivery information must be given to the operator at least 24 hours before the waste is delivered if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b143306c-5857-41bb-a570-372df44bb477" id="sec.53-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the waste disposal site is in the non-levy zone; and</txt></block></li><li guid="_09b5e95f-65af-4f6b-a730-95917adbf07d" id="sec.53-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the waste was generated outside the non-levy zone; and</txt></block></li><li guid="_7dc9a33b-1dae-425e-aafe-6f84d5dbb15a" id="sec.53-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the waste is delivered in a vehicle with a GCM or GVM of more than 4.5 tonnes.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_24653e14-46e9-4232-8aad-98216221eefe" id="sec.53-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.53-ssec.2" target.guid="_5a8388b6-2afa-49de-b2a2-391f931857d4">subsections (2)</intref> and <intref check="valid" refid="sec.53-ssec.3" target.guid="_c0dde610-b7af-40bb-ab4e-d429c822dc14">(3)</intref> do not apply to the person if the person knows the operator already has the delivery information when the information would otherwise be required under <intref check="valid" refid="sec.53-ssec.2" target.guid="_5a8388b6-2afa-49de-b2a2-391f931857d4">subsection (2)</intref> or <intref check="valid" refid="sec.53-ssec.3" target.guid="_c0dde610-b7af-40bb-ab4e-d429c822dc14">(3)</intref>.</txt><note guid="_9da011cc-3560-4f6c-8c09-22c2348ae37e" id="sec.53-ssec.4-note" type="example"><heading guid="_092e2595-f15f-4198-9b62-e7f2f0949cf3" id="sec.53-ssec.4-note-he">Example—</heading><block><txt break.before="1">The person delivering the waste is acting on behalf of another person and knows that the other person has already given the delivery information.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_6a614ce9-2087-4b6a-969e-81f4479bcea6" id="sec.53-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the operator of the waste disposal site asks the person to give the operator the delivery information in the approved form, the person must comply with the request unless the person has a reasonable excuse.</txt></block><penalty guid="_4fff27d6-bf8d-40f9-8ad4-7204c08df80c" id="sec.53-ssec.5-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_a5bc0009-c9c0-4b06-8398-4867a847ff1a" id="sec.53-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">If a person (the <defterm guid="_6b3696ca-8814-4428-bcf7-8a50b1b88de8" id="sec.53-def.principal" type="definition">principal</defterm>) engages or directs another person to deliver waste on behalf of the principal, it is a defence for <intref check="valid" refid="sec.53-ssec.2" target.guid="_5a8388b6-2afa-49de-b2a2-391f931857d4">subsection (2)</intref> or <intref check="valid" refid="sec.53-ssec.5" target.guid="_6a614ce9-2087-4b6a-969e-81f4479bcea6">(5)</intref> for the principal to prove—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7ef86632-a95f-41a0-b3e2-4fbc872e5fdf" id="sec.53-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the principal gave the other person appropriate instructions; and</txt></block></li><li guid="_8cde67df-9857-4aae-8cfa-7b538169d9b6" id="sec.53-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the principal used all reasonable precautions to ensure the other person complied with this section; and</txt></block></li><li guid="_8d9c1a40-b49f-4997-af9a-bcf5ee3423d1" id="sec.53-ssec.6-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the principal could not by the exercise of reasonable diligence have stopped the commission of the offence.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_63948016-6550-4cb5-beb3-86e6997351d4" id="sec.53-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">Nothing in this section prevents the person from giving delivery information for more than 1 consignment of waste to be delivered to the waste disposal site.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a0ffb14c-be84-401b-a7d8-b15021049659" id="sec.54" provision.type="other" spent.amends="0"><no>54</no><heading guid="_6f322a88-6b9e-4db1-acc6-4100925a747e" id="sec.54-he">Person delivering particular waste to give information</heading><subclause affected.by.uncommenced="0" guid="_b9879072-92cd-47cd-bf56-ee77f2ce479d" id="sec.54-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e86b9d9a-2fda-462a-8101-751f55d707b2" id="sec.54-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a person delivers waste to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_36c373b3-db14-460d-9099-ffbb689db294" id="sec.54-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a resource recovery and transfer facility in the non-levy zone; or</txt></block></li><li guid="_04b01147-585e-4796-a20c-6b853f9d09bc" id="sec.54-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">an entity conducting a recycling activity in the non-levy zone; and</txt></block></li></list></block></li><li guid="_313ece92-31d2-49d1-a11a-fb5fc746bb4f" id="sec.54-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the waste was generated outside the non-levy zone; and</txt></block></li><li guid="_fb0aa776-f4dc-43cc-a955-ff30ce7a7eb8" id="sec.54-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the person delivers the waste in a vehicle with a GCM or GVM of more than 4.5 tonnes.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8727b9db-5311-434e-a17f-51b7026b6fc0" id="sec.54-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The person must, at least 24 hours before delivering the waste, give the operator of the resource recovery and transfer facility or entity the information (the <defterm guid="_e9e75a8f-389d-4550-bde3-1472b75133d1" id="sec.54-def.deliveryinformation" type="definition">delivery information</defterm>) that the operator or entity reasonably requires to identify—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dec87593-a4a5-475a-81d9-fa444bc8f58a" id="sec.54-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">how much of the waste is exempt waste and how much of it is levyable waste; and</txt></block></li><li guid="_22b74e54-a529-44ec-b036-47b27ece33c2" id="sec.54-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether the waste was generated in the waste levy zone or outside Queensland.</txt></block></li></list></block><penalty guid="_09dca19f-0132-4d20-9e61-3fb6a75bddb5" id="sec.54-ssec.2-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_9e0407f1-778c-4359-a204-1a006f87bd71" id="sec.54-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.54-ssec.2" target.guid="_8727b9db-5311-434e-a17f-51b7026b6fc0">subsection (2)</intref> does not apply to the person if the person knows the operator or entity already has the delivery information when it is required under that subsection.</txt><note guid="_5365f3d6-f1d5-4ea8-9c94-bb7cfc483b2e" id="sec.54-ssec.3-note" type="example"><heading guid="_f0ba4e58-4d29-4c4f-a49e-7f7b4beafd7c" id="sec.54-ssec.3-note-he">Example—</heading><block><txt break.before="1">The person delivering the waste to a resource recovery and transfer facility is the operator of the facility.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_10968dc9-48a9-4351-b8fa-7812ed1bae02" id="sec.54-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the operator or entity asks the person to give the delivery information to the operator or entity in the approved form, the person must comply with the request unless the person has a reasonable excuse.</txt></block><penalty guid="_d2431e83-ff93-4ad5-a474-d397eb091aac" id="sec.54-ssec.4-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_09f2879f-3bc8-470d-b8e8-bfc185ac1d62" id="sec.54-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If a person (the <defterm guid="_a5c4c1dd-2eb1-4e58-adf1-8624f44774d6" id="sec.54-def.principal" type="definition">principal</defterm>) engages or directs another person to deliver waste on behalf of the principal, it is a defence for <intref check="valid" refid="sec.54-ssec.2" target.guid="_8727b9db-5311-434e-a17f-51b7026b6fc0">subsections (2)</intref> and <intref check="valid" refid="sec.54-ssec.4" target.guid="_10968dc9-48a9-4351-b8fa-7812ed1bae02">(4)</intref> for the principal to prove—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_77dc7200-0490-4bbd-b75a-9dfa82f5f79d" id="sec.54-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the principal gave the other person appropriate instructions; and</txt></block></li><li guid="_90975315-d9f9-4629-af76-71fc0770fe97" id="sec.54-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the principal used all reasonable precautions to ensure the other person complied with this section; and</txt></block></li><li guid="_45e37135-c7ac-4d50-a415-f9dca45aa5f7" id="sec.54-ssec.5-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the principal could not by the exercise of reasonable diligence have stopped the commission of the offence.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f6a940b3-05a0-4850-a1f5-83f33617c646" id="sec.54-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">Nothing in this section prevents the person from giving delivery information for more than 1 consignment of waste to be delivered to the resource recovery and transfer facility or to the entity.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e6ffb854-e231-43ed-a2d7-2b1d436cf60c" id="sec.54-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_6977c174-11b2-4bed-88f9-85aef839146b" id="sec.54-ssec.7-def.resourcerecoveryandtransferfacility_"><txt break.before="1"><defterm guid="_31baac8a-cae7-4ab7-8c9d-125081e6920c" id="sec.54-ssec.7-def.resourcerecoveryandtransferfacility" type="definition">resource recovery and transfer facility</defterm> means a facility used for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2613f5e0-5ee7-49e5-a2d0-a3d4a1920f8a" id="sec.54-ssec.7-def.resourcerecoveryandtransferfacility-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">receiving, sorting, dismantling or baling waste; or</txt></block></li><li guid="_bfe225fe-bfd8-426b-8f94-4a90fae64004" id="sec.54-ssec.7-def.resourcerecoveryandtransferfacility-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">storing waste before moving it, from the site where the relevant activity is carried out, for recycling, processing, treatment or disposal.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1d7e77f1-6b06-4261-9e69-133a8a6968c5" id="sec.55" provision.type="other" spent.amends="0"><no>55</no><heading guid="_27841d7d-4725-4f24-a640-a941ef5a932e" id="sec.55-he">Giving false or misleading information when delivering waste</heading><subclause affected.by.uncommenced="0" guid="_a1353cd0-cb61-4c49-b274-9989ce14fced" id="sec.55-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to a person delivering waste to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3db7e12c-7183-4f2b-a6ab-c5fcb7c485be" id="sec.55-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a waste disposal site; or</txt></block></li><li guid="_ab6d2689-c130-484a-966a-bb0335fb3ba2" id="sec.55-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a resource recovery and transfer facility in the non-levy zone; or</txt></block></li><li guid="_91dfbdbe-e461-4d37-b6c0-4a9552ba8b8a" id="sec.55-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">an entity conducting a recycling activity in the non-levy zone.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6c21656a-8d99-418c-8001-43c03bba72fb" id="sec.55-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The person must not give the operator or entity information about the waste that the person knows is false or misleading in a material particular.</txt></block><penalty guid="_341921dd-a59c-4cea-bf9d-117254d7cc54" id="sec.55-ssec.2-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_271b38c0-f185-4456-888d-210980e0f76d" id="sec.55-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.55-ssec.2" target.guid="_6c21656a-8d99-418c-8001-43c03bba72fb">subsection (2)</intref> does not apply to the person if the person, when giving information in a document—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5a0ee546-b103-4aad-84c8-24f7098fbc78" id="sec.55-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">tells the operator or entity, to the best of the person’s ability, how the document is false or misleading; and</txt></block></li><li guid="_50e851cd-f3af-47cb-a50a-0eeedcd2448b" id="sec.55-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the person has, or can reasonably obtain, the correct information—gives the correct information.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_90a8fa42-70a4-4bae-aca7-c229e02f2c0d" id="sec.55-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">To remove any doubt, it is declared that <intref check="valid" refid="sec.55-ssec.2" target.guid="_6c21656a-8d99-418c-8001-43c03bba72fb">subsection (2)</intref> applies to any information whether or not the person is required to give the information under <intref check="valid" refid="sec.53" target.guid="_f86b8d4b-010d-4c7b-83cf-00c6cb4be065">section 53</intref> or <intref check="valid" refid="sec.54" target.guid="_a0ffb14c-be84-401b-a7d8-b15021049659">54</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3d86172c-f94c-4821-ba8d-22719552163e" id="sec.55-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_05c05f23-a62b-4475-a09f-a9b28fa9e3d1" id="sec.55-ssec.5-def.operator_"><txt break.before="1"><defterm guid="_a0b0cc98-3ae0-408e-8b6f-543d89558bab" id="sec.55-ssec.5-def.operator" type="definition">operator</defterm> means the operator of the waste disposal site or resource recovery and transfer facility.</txt></definition><definition affected.by.uncommenced="0" guid="_04ebfcc1-3959-427d-aeb2-7aeaff21096c" id="sec.55-ssec.5-def.resourcerecoveryandtransferfacility_"><txt break.before="1"><defterm guid="_ed3beac8-06bb-466f-b8a8-4466c43ab0ab" id="sec.55-ssec.5-def.resourcerecoveryandtransferfacility" type="definition">resource recovery and transfer facility</defterm> see <intref check="valid" refid="sec.54" target.guid="_a0ffb14c-be84-401b-a7d8-b15021049659">section 54</intref><intref check="valid" refid="sec.54-ssec.7" target.guid="_e6ffb854-e231-43ed-a2d7-2b1d436cf60c">(7)</intref>.</txt></definition></deflist></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_0aedb4ba-ab10-4859-a9f1-8f0698814dca" id="ch.3-pt.5-div.2"><no>Division 2</no><heading guid="_d1913c20-658d-48a3-b990-96c85ffd75b1" id="ch.3-pt.5-div.2-he">Obligations of operators of waste disposal sites</heading><subdivision affected.by.uncommenced="0" guid="_cbffdb08-1cf8-4d1f-b22b-8b322ef30aa8" id="ch.3-pt.5-div.2-sdiv.1"><no>Subdivision 1</no><heading guid="_dbdb4245-929d-4e46-b793-fdfb4e4d82d7" id="ch.3-pt.5-div.2-sdiv.1-he">Remitting waste levy</heading><clause affected.by.uncommenced="0" guid="_56f0993b-32fe-42f6-9d56-3991b3827be2" id="sec.56" provision.type="other" spent.amends="0"><no>56</no><heading guid="_6eb0753c-4095-4a31-a182-9cf30edc01a4" id="sec.56-he">Remitting waste levy amount to the State</heading><subclause affected.by.uncommenced="0" guid="_64cd5548-824c-485e-9ed4-8f55f95b578b" id="sec.56-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">After receiving a summary data return from the operator of a levyable waste disposal site under <intref check="valid" refid="sec.72" target.guid="_d30e771f-e48c-4292-86ed-c1b4fb7d03e1">section 72</intref>, the chief executive must give the operator an invoice stating the total amount of all waste levy amounts payable to the State by the operator for the levy period to which the return relates.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6eb7bd0d-3090-4517-9c93-ed8f5b72953c" id="sec.56-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The operator must pay to the chief executive the total amount stated in the invoice by the due date for payment of the amount.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8e1baf20-4f29-4c33-8fbc-4fb4c485ba1f" id="sec.56-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If a waste levy amount owing by an operator remains unpaid after its due date for payment, interest is payable on the unpaid amount for each day starting on the day after the due date for payment and ending on the day the amount is actually paid.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c45dd7b6-8386-4254-9072-56027a8e05a6" id="sec.56-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The interest payable for a day as mentioned in <intref check="valid" refid="sec.56-ssec.3" target.guid="_8e1baf20-4f29-4c33-8fbc-4fb4c485ba1f">subsection (3)</intref> is payable at the same rate as that applying to unpaid tax under the <legref check="valid" jurisd="QLD" target.doc.id="act-2001-072" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act"><name emphasis="yes">Taxation Administration Act 2001</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.54" target.doc.id="act-2001-072" target.guid="_80f57ff2-5291-4b35-9f47-9815af82378b" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act">section 54</legref> and the <legref check="valid" jurisd="QLD" target.doc.id="sl-2012-0134" target.version.series="edcac6b9-d400-46e7-9c0e-56c246202eb6" type="subordleg"><name emphasis="yes">Taxation Administration Regulation 2012</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.8" target.doc.id="sl-2012-0134" target.guid="_d1b73550-135e-4666-875b-4bcd5f709c87" target.version.series="edcac6b9-d400-46e7-9c0e-56c246202eb6" type="subordleg">section 8</legref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_85876646-e6c6-432d-a2f0-36026c770728" id="sec.56-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Any waste levy amount payable by the operator of a levyable waste disposal site and remaining unpaid after its due date for payment, and any interest payable on the unpaid amount, may be recovered by the chief executive in a court with jurisdiction for the recovery of the amount as a debt payable by the operator to the State.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bdd3e7b0-7de2-426c-8153-d7170f2e0f1e" id="sec.56-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_c9069f81-a9e8-42ed-82ae-8b29498afba6" id="sec.56-ssec.6-def.summarydatareturn_"><txt break.before="1"><defterm guid="_169f2d70-c275-492e-a0fa-c4bd95af2ff1" id="sec.56-ssec.6-def.summarydatareturn" type="definition">summary data return</defterm> see <intref check="valid" refid="sec.72" target.guid="_d30e771f-e48c-4292-86ed-c1b4fb7d03e1">section 72</intref><intref check="valid" refid="sec.72-ssec.5" target.guid="_f40e6e8f-7871-4c7d-bfe4-139b112c1e5c">(5)</intref>.</txt></definition></deflist></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_dd091a62-df62-44fd-a7fe-a0c52860dfda" id="ch.3-pt.5-div.2-sdiv.2"><no>Subdivision 2</no><heading guid="_0c5c4023-709c-4cc0-a27a-fb05d2517d56" id="ch.3-pt.5-div.2-sdiv.2-he">Weighbridges</heading><clause affected.by.uncommenced="0" guid="_bd3e7a2f-7827-447c-836a-41ca94f9cf4f" id="sec.57" provision.type="other" spent.amends="0"><no>57</no><heading guid="_0446ccf4-74c6-4121-b105-b12c0656ff79" id="sec.57-he">Weighbridge required</heading><subclause affected.by.uncommenced="0" guid="_eb20a073-64b4-4868-913f-8efeef79b001" id="sec.57-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a waste disposal site in the waste levy zone must ensure a weighbridge is installed at the site from the beginning of the day on—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8327ae28-d352-4ba1-a777-f5a21abdff5e" id="sec.57-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the operator is required to hold an environmental authority for the disposal of more than 10,000 tonnes of waste in a year at the site—1 July 2019; or</txt></block></li><li guid="_49b25cc9-2129-4f38-bcc3-2c14ea9fea5c" id="sec.57-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the operator is required to hold an environmental authority for the disposal of more than 5,000 tonnes, but not more than 10,000 tonnes, of waste in a year at the site—1 July 2021; or</txt></block></li><li guid="_279b4f81-ffe6-492b-b645-d436040f719d" id="sec.57-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">for any other operator—1 July 2024.</txt></block></li></list></block><penalty guid="_90f742d2-8ef1-4d94-a350-92e6375afdf2" id="sec.57-ssec.1-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_4ec501ec-697e-48dd-8f3c-9d9d0707614d" id="sec.57-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If a waste disposal site is in the non-levy zone and receives during the period from 1 July 2019 to 31 December 2019 at least 300 tonnes of levyable waste generated outside the non-levy zone, the operator must ensure a weighbridge is installed at the site by 30 June 2020.</txt></block><penalty guid="_3b929998-9eb0-4824-a89b-6f5c5ff023a1" id="sec.57-ssec.2-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_f9eb39a1-4e79-49fb-8f83-db64b18b8a60" id="sec.57-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">From 1 January 2020, if a waste disposal site is in the non-levy zone and receives at least 600 tonnes of levyable waste generated outside the non-levy zone during a year, the operator must ensure a weighbridge is installed at the site by 30 June in the following year.</txt></block><penalty guid="_106e5d8c-66ea-485b-a861-8c2d20988ad4" id="sec.57-ssec.3-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause></clause><clause affected.by.uncommenced="0" guid="_389f50f8-6a50-4fc6-82b5-03dc71fa4534" id="sec.58" provision.type="other" spent.amends="0"><no>58</no><heading guid="_a38ef13b-e35f-47da-ab5c-cb5f77e1d5a8" id="sec.58-he">Weighbridge requirements</heading><subclause affected.by.uncommenced="0" guid="_c51a9739-a7a0-4088-8c22-9cb0c76673d9" id="sec.58-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the operator of a waste disposal site at which a weighbridge is installed.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1090ac38-cafb-430b-bf43-f045d94af667" id="sec.58-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The operator must ensure that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d263d7d1-71d3-44a9-aa94-d6431a909fb1" id="sec.58-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the installation and operation of the weighbridge complies with the requirements prescribed by regulation for the weighbridge; and</txt></block></li><li guid="_24b4dfdb-8524-4090-a4df-1dc0096d68c6" id="sec.58-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the weighbridge is kept in proper working order; and</txt></block></li><li guid="_76bc29e4-f871-4882-996a-d38062aaed8c" id="sec.58-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a copy of any record of certification for the weighbridge obtained in complying with the <legref check="invalid" jurisd="CTH" type="act"><name emphasis="yes">National Measurement Act 1960</name> (Cwlth)</legref> is kept by the operator for 5 years after the certification.</txt></block></li></list><penalty guid="_2a4d6f26-d9ad-4669-82ce-68eefc90bbfa" id="sec.58-ssec.2-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></block></subclause><subclause affected.by.uncommenced="0" guid="_0bd9ba12-b632-4099-83bf-7f1593ebba73" id="sec.58-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the weighbridge is out of operation, the operator must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ce0898af-066e-4fb5-8d2b-0e8d9e5852a0" id="sec.58-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">bring the weighbridge back into operation in the shortest practicable time; and</txt></block></li><li guid="_d63a8080-88d8-4ac8-ba80-7ad453da4488" id="sec.58-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">keep a written record detailing the period for which the weighbridge was out of operation and the reason it was out of operation.</txt></block></li></list><penalty guid="_3ff94b30-2456-4113-98b5-80a95b857c8e" id="sec.58-ssec.3-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></block></subclause><subclause affected.by.uncommenced="0" guid="_d8459da6-ad43-4b64-be72-e4a51b28a382" id="sec.58-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Further, if the weighbridge is out of operation for a period of more than 24 hours, the operator must notify the chief executive of the following details within 3 days after the weighbridge first became out of operation, whether or not the weighbridge is still out of operation—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1e9fa49d-403d-4452-a7bd-4e6a9d25e342" id="sec.58-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the event that resulted in the weighbridge being out of operation;</txt></block></li><li guid="_51a25408-41ea-45f5-9761-bed7d53640ef" id="sec.58-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">when the weighbridge first became out of operation;</txt></block></li><li guid="_6cadb5f8-c642-4371-a38c-4460c8a13290" id="sec.58-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">whether the weighbridge is still out of operation;</txt></block></li><li guid="_05e649b4-90cf-4d16-a731-e88be45c847e" id="sec.58-ssec.4-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">if the weighbridge is still out of operation—what actions are being taken to bring the weighbridge back into operation.</txt></block></li></list><penalty guid="_d06f1a15-052e-40c9-bc64-7776e6525b42" id="sec.58-ssec.4-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></block></subclause><subclause affected.by.uncommenced="0" guid="_d483eaed-bc6c-4ea8-8545-cb1b9360d798" id="sec.58-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the weighbridge is still out of operation when the chief executive is notified under <intref check="valid" refid="sec.58-ssec.4" target.guid="_d8459da6-ad43-4b64-be72-e4a51b28a382">subsection (4)</intref>, the operator must notify the chief executive of its being brought back into operation within 3 days after it starts operating again.</txt><penalty guid="_61a4a9e1-89dd-4b69-b4d0-02a1f0967833" id="sec.58-ssec.5-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_0722aaef-72b8-4da0-8611-f27e102cf4db" id="ch.3-pt.5-div.2-sdiv.3"><no>Subdivision 3</no><heading guid="_e71fce7e-b561-46bf-8f0e-e099b79c8b11" id="ch.3-pt.5-div.2-sdiv.3-he">Measurement of waste</heading><clause affected.by.uncommenced="0" guid="_753c71b4-2d8f-457c-9d00-64ab00810913" id="sec.59" provision.type="other" spent.amends="0"><no>59</no><heading guid="_3ca5d5c1-e574-4d9d-9468-507fbfdf1663" id="sec.59-he">When waste or other material must be measured</heading><subclause affected.by.uncommenced="0" guid="_4bf8e2cf-a71f-4d83-9f36-342bae6b5d31" id="sec.59-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Waste, or an amount of other material that is more than 1 tonne, is required to be measured if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0744e1e0-970d-465f-a249-4fff671be860" id="sec.59-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">it is delivered to a levyable waste disposal site; or</txt></block></li><li guid="_ce7d7eb0-fe92-4ddb-b998-b1d640bfb224" id="sec.59-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">after being delivered to a levyable waste disposal site, it is moved to a place outside the site; or</txt></block></li><li guid="_2249e5cb-338c-4051-b22f-54082b3a3a43" id="sec.59-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">it is delivered in a vehicle with a GCM or GVM of more than 4.5 tonnes to a resource recovery area for a waste disposal site; or</txt></block></li><li guid="_2f902413-935d-4a79-aa54-d291ac48eb64" id="sec.59-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">after being delivered to a resource recovery area for a waste disposal site—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d8fa331f-1041-44cf-a3a3-ba21d47e7e6b" id="sec.59-ssec.1-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">it is moved from the area to any other part of the site; or</txt></block></li><li guid="_61383616-737d-4304-b7d8-25fcee486e94" id="sec.59-ssec.1-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">it is moved to a place outside the site in a vehicle with a GCM or GVM of more than 4.5 tonnes.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_88e7dc8b-1e49-4027-842f-11abf8118225" id="sec.59-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.59-ssec.1" target.guid="_4bf8e2cf-a71f-4d83-9f36-342bae6b5d31">Subsection (1)</intref> does not apply in relation to a levyable waste disposal site in the non-levy zone if the operator of the site—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6bc16766-c41e-4ddc-a37e-21aecbb617cd" id="sec.59-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is required to hold an environmental authority for the disposal of not more than 5,000 tonnes of waste in a year at the site; and</txt></block></li><li guid="_3f7146a8-0a61-4a5d-967e-b8646c86d6e2" id="sec.59-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">has taken all reasonable practical steps to ensure that levyable waste generated at a place outside the non-levy zone can not be lawfully delivered to the site.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_6b758c45-59e4-4c54-a187-7dd0e64f5df2" id="sec.60" provision.type="other" spent.amends="0"><no>60</no><heading guid="_9a60006b-65cc-4864-865c-74e97328fcce" id="sec.60-he">Measurement of waste by weighbridge</heading><subclause affected.by.uncommenced="0" guid="_84066698-9ba5-4115-835c-9ec86ecf7d95" id="sec.60-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a weighbridge is installed at a waste disposal site, whether or not it is required under <intref check="valid" refid="sec.57" target.guid="_bd3e7a2f-7827-447c-836a-41ca94f9cf4f">section 57</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7c06ce4a-c72c-46fe-b2c8-e80c721baa68" id="sec.60-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Each time waste or other material is required to be measured under <intref check="valid" refid="sec.59" target.guid="_753c71b4-2d8f-457c-9d00-64ab00810913">section 59</intref>, the operator of the waste disposal site must ensure the weighbridge is used to measure and record the waste or other material.</txt></block><penalty guid="_e413cf13-9c2f-49f7-8419-6c667cc16370" id="sec.60-ssec.2-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty><note guid="_d0af2290-6b7b-4d88-a92d-275c0607d16e" id="sec.60-ssec.2-note" type="example"><heading guid="_46ccf9fe-786d-445f-bb92-a01c626600c9" id="sec.60-ssec.2-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.42" target.guid="_58ddcdbe-ae06-4c12-995a-22ec6e2e8486">section 42</intref>.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_ff77a3ce-48e6-4a94-bb69-7b516b275486" id="sec.60-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, if it is not practicable to use the weighbridge to measure and record a particular amount of waste or other material, the operator may measure and record the waste in the way the operator and the chief executive agree to in writing.</txt></block><note guid="_dfb9e4ef-825a-4614-bab5-2ff1e060723f" id="sec.60-ssec.3-note" type="example"><heading guid="_2b1b3bba-7449-40bd-b9cb-cf6c23b376fa" id="sec.60-ssec.3-note-he">Examples of something that is impracticable to weigh using a weighbridge—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_6a273b20-c446-46f1-86aa-eda46f7ebd0e" id="sec.60-ssec.3-note-para1" provision.type="other"><no>•</no><block><txt break.before="0">a large aircraft</txt></block></li><li guid="_68bd331c-9ca7-479a-84a3-ee15dd4c0505" id="sec.60-ssec.3-note-para1-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">a large amount of waste that is taken to be delivered to the levyable part of a waste disposal site because of a cancellation or revocation of the declaration of the resource recovery area</txt></block></li></list></block></note></subclause><subclause affected.by.uncommenced="0" guid="_d1d3a074-6d0e-465a-93ce-2ccf0ebc7737" id="sec.60-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The operator of the waste disposal site must ensure a record made under <intref check="valid" refid="sec.60-ssec.2" target.guid="_7c06ce4a-c72c-46fe-b2c8-e80c721baa68">subsection (2)</intref> includes the information required by the chief executive.</txt></block><penalty guid="_0dd0316f-1b48-4c7b-ba21-91d249cf66c0" id="sec.60-ssec.4-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_03f84e48-01f2-48ba-aad0-e3f6f97649cf" id="sec.60-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The information required by the chief executive under <intref check="valid" refid="sec.60-ssec.4" target.guid="_d1d3a074-6d0e-465a-93ce-2ccf0ebc7737">subsection (4)</intref> must be published on the department’s website and may include only—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e7f0fa86-e940-4784-a093-9be02c0a603d" id="sec.60-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the type of waste or other material; and</txt></block></li><li guid="_568c233b-142c-490d-be95-e19e64300fe4" id="sec.60-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether the waste was generated in the waste levy zone, the non-levy zone or outside Queensland; and</txt></block></li><li guid="_f9d8facc-5621-4d3f-876c-ac2caa564d0c" id="sec.60-ssec.5-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">details of any exemption or discount applying to the waste; and</txt></block></li><li guid="_6547d982-df20-45d4-8ace-92f65b825d7c" id="sec.60-ssec.5-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the vehicle used to move the waste or other material.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5666ac22-639c-4ed9-8416-49ba2e2a85c0" id="sec.60-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">If the weighbridge is not in operation when an amount of waste or other material is required to be measured under <intref check="valid" refid="sec.59" target.guid="_753c71b4-2d8f-457c-9d00-64ab00810913">section 59</intref>, the operator of the waste disposal site must ensure the waste or other material is measured and recorded in compliance with the weight measurement criteria.</txt></block><penalty guid="_0a3288e4-1c4e-4cee-8789-0db0a90f3629" id="sec.60-ssec.6-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause></clause><clause affected.by.uncommenced="0" guid="_70b550db-f7c0-4d9e-9f5c-43a6756d09b9" id="sec.61" provision.type="other" spent.amends="0"><no>61</no><heading guid="_c78ee8fe-0a82-4096-b111-8f5b1ca3a5db" id="sec.61-he">Measurement of waste other than by weighbridge</heading><subclause affected.by.uncommenced="0" guid="_6171f9a7-0075-4790-a858-b8e46bcb5f1f" id="sec.61-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a weighbridge is not installed at a waste disposal site.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_72ada995-52a6-453a-b663-5f6459e43d3c" id="sec.61-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Each time waste or other material is required to be measured under <intref check="valid" refid="sec.59" target.guid="_753c71b4-2d8f-457c-9d00-64ab00810913">section 59</intref>, the operator of the waste disposal site must ensure the waste or other material is measured and recorded in compliance with the weight measurement criteria.</txt></block><penalty guid="_2a5840ce-811f-45e3-a487-9a20df66fd8f" id="sec.61-ssec.2-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty><note guid="_ce902e48-0eac-4fae-9390-abe7d4798793" id="sec.61-ssec.2-note" type="example"><heading guid="_157973ac-6f8e-4f8a-9ace-8fcc5ede00f0" id="sec.61-ssec.2-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.42" target.guid="_58ddcdbe-ae06-4c12-995a-22ec6e2e8486">section 42</intref>.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_28737b71-b41a-4151-960a-4724cecac5f8" id="sec.61-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The operator of the waste disposal site must ensure a record made under <intref check="valid" refid="sec.61-ssec.2" target.guid="_72ada995-52a6-453a-b663-5f6459e43d3c">subsection (2)</intref> includes the information required by the chief executive.</txt></block><penalty guid="_de392cf9-d5df-40dc-b762-f3380b1c031d" id="sec.61-ssec.3-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_accd1702-e30f-48d1-bc03-8c358038aab4" id="sec.61-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The information required by the chief executive under <intref check="valid" refid="sec.61-ssec.3" target.guid="_28737b71-b41a-4151-960a-4724cecac5f8">subsection (3)</intref> must be published on the department’s website and may include only—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e35a112f-54d3-466e-ba6e-c4658df6ccf7" id="sec.61-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the type of waste or material; and</txt></block></li><li guid="_177e33e9-1f60-48d1-a050-2fbbf9618be2" id="sec.61-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether the waste was generated in the waste levy zone, the non-levy zone or outside Queensland; and</txt></block></li><li guid="_4ae978be-dc88-423f-bf55-0039bdac2e07" id="sec.61-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">details of any exemption or discount applying to the waste; and</txt></block></li><li guid="_41588461-5b02-4294-ba14-8fd0c1bac1f2" id="sec.61-ssec.4-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the vehicle used to move the waste or material.</txt></block></li></list></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_86ac191a-c547-4ca9-a224-c4a42ed2d1a7" id="ch.3-pt.5-div.2-sdiv.4"><no>Subdivision 4</no><heading guid="_276ecdfc-16d3-4b66-8ec1-f3c00949c8cd" id="ch.3-pt.5-div.2-sdiv.4-he">Monitoring system</heading><clause affected.by.uncommenced="0" guid="_4807d1f8-c777-445d-bd82-69bf16ee0fd4" id="sec.62" provision.type="other" spent.amends="0"><no>62</no><heading guid="_a405490e-c6d8-470f-b959-f3dc929e2fdc" id="sec.62-he">What is a <defterm guid="_510b2980-ab0e-46d8-bf25-dc32d2e56a07" id="sec.62-def.monitoringsystem" type="definition">monitoring system</defterm></heading><block><txt break.before="0">A <defterm guid="_205660af-d365-4c94-9871-8a60a36fbc04" id="def.monitoringsystem" type="definition">monitoring system</defterm> is a closed-circuit television or another system the chief executive approves as a monitoring system by publishing details of the system on the department’s website.</txt></block></clause><clause affected.by.uncommenced="0" guid="_96adeb33-f091-4c60-a7ed-0372dc95cf90" id="sec.63" provision.type="other" spent.amends="0"><no>63</no><heading guid="_fd217cad-87a8-4f1f-a094-8aaf92ba8691" id="sec.63-he">When monitoring system may be required by chief executive</heading><subclause affected.by.uncommenced="0" guid="_38060445-1459-4c5b-8230-2bd41e01aaae" id="sec.63-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the chief executive reasonably believes the operator of a waste disposal site has not complied with the operator’s obligation under this chapter to pay the waste levy or give the chief executive a waste data return for the site.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9c4256da-1147-4d8d-a63c-819a7c7390ba" id="sec.63-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may, by notice given to the operator, require the operator to install, maintain and operate a monitoring system at the site to record vehicle movements at the locations (each a <defterm guid="_1338b542-785e-4790-8a01-f4b0d4cea476" id="sec.63-def.monitoringpoint" type="definition">monitoring point</defterm>) stated in the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_23ee4441-af46-427a-8e4a-58e294f4ee9d" id="sec.63-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The notice must also—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4cfff8f5-3382-46c4-897e-97514db521e8" id="sec.63-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">state the day by which the monitoring system must be installed; and</txt></block></li><li guid="_464a7285-82f2-411b-b108-eb9a9cfec1cb" id="sec.63-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">include or be accompanied by an information notice for the chief executive’s decision to give the notice.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6000d753-f1d3-46b5-b4aa-c5eaa52b1786" id="sec.63-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The operator must comply with the notice.</txt></block><penalty guid="_a81b4f27-0a8d-43c3-a25c-a7a97657f95e" id="sec.63-ssec.4-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause></clause><clause affected.by.uncommenced="0" guid="_ce9a99f8-30c8-4c16-b554-47cc4819dcd6" id="sec.64" provision.type="other" spent.amends="0"><no>64 </no><heading guid="_61460018-6aba-47b4-91e3-52707e2ec51b" id="sec.64-he">Requirements for monitoring system</heading><subclause affected.by.uncommenced="0" guid="_75dbb3a1-f916-49ac-9766-d2773315bce6" id="sec.64-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the operator of a waste disposal site given a notice under <intref check="valid" refid="sec.63" target.guid="_96adeb33-f091-4c60-a7ed-0372dc95cf90">section 63</intref> requiring the operator to install, maintain and operate a monitoring system.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2fd69e3c-2541-4818-8ea3-5b61b1b9290f" id="sec.64-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The operator must comply with the obligations stated in <intref check="valid" refid="sec.64-ssec.3" target.guid="_9e3764fa-9d70-43ff-8ba2-96b79f0d8694">subsections (3)</intref> and <intref check="valid" refid="sec.64-ssec.5" target.guid="_9e0fa8ec-b4f2-414a-b103-7aaf5c2f7393">(5)</intref>.</txt></block><penalty guid="_e6de53a3-e15d-4dc4-9d7f-877397d929ca" id="sec.64-ssec.2-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_9e3764fa-9d70-43ff-8ba2-96b79f0d8694" id="sec.64-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The operator must— </txt><list number.type="manual" unnumbered.indent="0"><li guid="_b53d5f56-efd9-406c-ab88-1494d69dd00a" id="sec.64-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">display signage at the waste disposal site in a way that is likely to make persons arriving at the site aware that a monitoring system is installed at the site; and</txt></block></li><li guid="_5ed9f11b-778a-46bb-97b3-277df2a46e47" id="sec.64-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">ensure the monitoring system—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c01ddee1-a9c3-4688-8d3a-04e2bd82b2c9" id="sec.64-ssec.3-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">meets the minimum requirements prescribed by regulation for the system; and</txt></block></li><li guid="_23f57352-4f9c-4bae-b45a-c809465fb143" id="sec.64-ssec.3-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">is kept in proper working order; and</txt></block></li><li guid="_b90bb7f7-93b0-43d0-9949-e883d4524086" id="sec.64-ssec.3-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">records vehicles at each monitoring point in a way that identifies the vehicles; and</txt><note guid="_b2d3a34c-02c5-4309-a117-0c5d2064ac6c" id="sec.64-ssec.3-para1.b-para2.iii-note" type="example"><heading guid="_156d3002-131b-44a1-a24c-345b934e375d" id="sec.64-ssec.3-para1.b-para2.iii-note-he">Example of a way that identifies a vehicle—</heading><block><txt break.before="1">an image of the vehicle’s registration</txt></block></note></block></li></list></block></li><li guid="_633f9523-9420-4806-a068-c3c3b71fa592" id="sec.64-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">comply with any requirements prescribed by regulation about maintaining the monitoring system; and</txt></block></li><li guid="_1d90fde1-73b5-489e-896b-5fdce89a1039" id="sec.64-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">store each recording in a secure place at the premises in compliance with any requirements prescribed by regulation for the storage; and</txt></block></li><li guid="_39f10da7-5114-40c2-ba5d-69a75874ce80" id="sec.64-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">keep each recording available for inspection by an authorised person at the premises until the recording is erased or destroyed in compliance with <intref check="valid" refid="sec.64-ssec.3-para1.f" target.guid="_8ab78ba1-5aad-43d7-8ddd-4783af65b8ab">paragraph (f)</intref>; and</txt></block></li><li guid="_8ab78ba1-5aad-43d7-8ddd-4783af65b8ab" id="sec.64-ssec.3-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">ensure a recording—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5038514e-821a-4448-94bc-1fb85a0b85da" id="sec.64-ssec.3-para1.f-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">is only erased or destroyed by the operator or a person approved by the operator; and</txt></block></li><li guid="_057942e1-a4c0-4904-8a1e-9188e7c799c6" id="sec.64-ssec.3-para1.f-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">is not erased or destroyed earlier than 60 days after it was made; and</txt></block></li><li guid="_2d830276-ad6d-45fc-842d-e1e9386fcaf9" id="sec.64-ssec.3-para1.f-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">is erased or destroyed no later than 90 days after it was made.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b43f4f82-6f23-47c1-bd76-dbe728ee1aaf" id="sec.64-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, if a copy of a recording is given to an authorised person, the recording—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_78f62329-6816-445e-97b5-3df85f051eae" id="sec.64-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">need only be kept available for inspection by an authorised person until the authorised person has confirmed by written notice that the recording is viewable; and</txt></block></li><li guid="_01b62be1-5d98-407c-8db0-dec695e5fc89" id="sec.64-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">may be destroyed once the authorised person has confirmed by written notice that the recording is viewable.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9e0fa8ec-b4f2-414a-b103-7aaf5c2f7393" id="sec.64-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The operator must not—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bac54938-64a3-46cb-9555-f8b207f5f5f2" id="sec.64-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">allow the monitoring system to be operated by anyone other than—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_69bae09c-c89c-4bce-8d34-d4621b3b95a6" id="sec.64-ssec.5-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the operator of the site; or</txt></block></li><li guid="_f17e439d-f25a-4f63-a90a-5f5d0e75ad61" id="sec.64-ssec.5-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a person approved by the operator; or</txt></block></li></list></block></li><li guid="_3d018c76-617a-463e-a0bb-f6cd8160f493" id="sec.64-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">allow a recording to be viewed by anyone other than an authorised person or a person mentioned in <intref check="valid" refid="sec.64-ssec.5-para1.a" target.guid="_bac54938-64a3-46cb-9555-f8b207f5f5f2">paragraph (a)</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c3b4aa9b-0568-4810-b4da-6b9079df28ea" id="sec.64-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_7739fe81-71c0-4bca-93b5-ab0717593bd8" id="sec.64-ssec.6-def.monitoringpoint_"><txt break.before="1"><defterm guid="_055ea1d0-689d-47e5-b58f-164b547129cf" id="sec.64-ssec.6-def.monitoringpoint" type="definition">monitoring point</defterm> means a monitoring point under <intref check="valid" refid="sec.63" target.guid="_96adeb33-f091-4c60-a7ed-0372dc95cf90">section 63</intref><intref check="valid" refid="sec.63-ssec.2" target.guid="_9c4256da-1147-4d8d-a63c-819a7c7390ba">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_7c479512-38ac-4e05-a5bd-1b06cd4a1d96" id="sec.64-ssec.6-def.recording_"><txt break.before="1"><defterm guid="_280feff2-12ed-46d6-92e6-f2cc65c61a5d" id="sec.64-ssec.6-def.recording" type="definition">recording</defterm> means a video recording made by the monitoring system.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_dbbd9665-2907-4272-9ade-c6776056d494" id="sec.65" provision.type="other" spent.amends="0"><no>65</no><heading guid="_0ee4e3a3-dbfc-46f6-9eca-3a4710c01225" id="sec.65-he">Requirements if monitoring system stops operating</heading><subclause affected.by.uncommenced="0" guid="_5989a76b-49a1-40c9-b62d-7bad6a3dc72e" id="sec.65-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the operator of a waste disposal site given a notice under <intref check="valid" refid="sec.63" target.guid="_96adeb33-f091-4c60-a7ed-0372dc95cf90">section 63</intref> requiring the operator to install, maintain and operate a monitoring system.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_510d3888-6300-4bc2-8f42-df3a93d8c3a1" id="sec.65-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the monitoring system stops recording, the operator must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_93ee5658-937d-4498-87ad-3eda36be03de" id="sec.65-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">bring the system back into operation in the shortest practicable time; and</txt></block></li><li guid="_41e8f3f9-0356-4a43-9dad-7a2518f024b4" id="sec.65-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">keep a written record detailing the period within which the system was not recording and the reason it was not recording.</txt></block></li></list></block><penalty guid="_474f2980-9b7c-4696-96a1-fa138f0877be" id="sec.65-ssec.2-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_00d07288-dcb2-4973-9f2f-05526c05614f" id="sec.65-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Further, if any event results in the monitoring system not recording for any period of more than 24 hours, the operator must notify the chief executive of the following details within 3 days after the system stops recording, whether or not the system is still not recording—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dc348b0a-2808-4751-8047-dc34d291b0f2" id="sec.65-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the event that resulted in the monitoring system not recording;</txt></block></li><li guid="_1bb999c0-ec90-4342-a0d9-2381bc4aef77" id="sec.65-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">when the monitoring system stopped recording;</txt></block></li><li guid="_a00d1a46-9059-4f46-a484-0e83f1a18165" id="sec.65-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">whether the monitoring system is still not recording;</txt></block></li><li guid="_86cc3ed6-3b47-4228-b687-8bc5992975dd" id="sec.65-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">if the monitoring system is still not recording—what actions are being taken to bring the monitoring system back into operation.</txt></block></li></list></block><penalty guid="_5af252c8-49f2-4d1e-8380-962eae8368f6" id="sec.65-ssec.3-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_632b76d9-63be-48a1-9740-cf62c0aa979f" id="sec.65-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the monitoring system is still not recording when the chief executive is notified under <intref check="valid" refid="sec.65-ssec.3" target.guid="_00d07288-dcb2-4973-9f2f-05526c05614f">subsection (3)</intref> but later starts recording again, the operator must notify the chief executive that it is recording again within 3 days after it starts recording.</txt></block><penalty guid="_3869d399-552a-469c-b015-e954e81d141c" id="sec.65-ssec.4-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></subclause></clause><clause affected.by.uncommenced="0" guid="_ecdde173-d7d4-4dca-84a0-d560a3858def" id="sec.66" provision.type="other" spent.amends="0"><no>66</no><heading guid="_5cbb1d7b-ff1c-442e-a1bb-b2dba08040e3" id="sec.66-he">Operators required to give chief executive plan for monitoring system</heading><subclause affected.by.uncommenced="0" guid="_f42b8d95-c1d7-46ff-801a-6caf13b1f8ef" id="sec.66-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the operator of a waste disposal site given a notice under <intref check="valid" refid="sec.63" target.guid="_96adeb33-f091-4c60-a7ed-0372dc95cf90">section 63</intref> requiring the operator to install, maintain and operate a monitoring system.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_88a2720f-514d-48d4-bc95-bfc0d6c3810a" id="sec.66-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The operator must give the chief executive a plan for the monitoring system complying with <intref check="valid" refid="sec.66-ssec.3" target.guid="_ddbe0192-55db-4077-8c95-14498d4bd85e">subsection (3)</intref> within 21 days after the day the operator is required under the notice to install the monitoring system.</txt></block><penalty guid="_c8848532-a7bf-48db-a269-16e187634663" id="sec.66-ssec.2-pen"><block><txt break.before="1">Maximum penalty—40 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_ddbe0192-55db-4077-8c95-14498d4bd85e" id="sec.66-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The plan for the monitoring system must contain a diagram of the system indicating the following in relation to the waste disposal site—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_faa5296f-1b1b-4bc8-99fe-1a9ec309e6a6" id="sec.66-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">how the components that comprise the system have been positioned;</txt></block></li><li guid="_c7032789-0c11-4a98-bf21-0065dd858a5d" id="sec.66-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the scope of the coverage of recordings by the system.</txt></block></li></list></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_cbce68ae-f2c2-4a5c-a5de-96c910857e05" id="ch.3-pt.5-div.2-sdiv.5"><no>Subdivision 5</no><heading guid="_47f7ad9c-ed9c-48dc-b9fc-77e8eafa6df5" id="ch.3-pt.5-div.2-sdiv.5-he">Volumetric surveys</heading><clause affected.by.uncommenced="0" guid="_1d60a32d-8f3f-4c74-b128-ed801dc77562" id="sec.67" provision.type="other" spent.amends="0"><no>67</no><heading guid="_c076f855-2eed-4fc6-be99-5f4e532eb89e" id="sec.67-he">Volumetric survey for levyable waste disposal site in waste levy zone</heading><subclause affected.by.uncommenced="0" guid="_f9bd9494-6402-47bd-8566-8b7b1ba77005" id="sec.67-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">From 1 June 2020, the operator of a levyable waste disposal site in the waste levy zone must, in each year, in compliance with the requirements for volumetric surveys under <intref check="valid" refid="sec.70" target.guid="_dbe8c473-b76d-497a-9d0a-2620102dd03c">section 70</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_aff7e485-ee16-4d42-8782-38a1b5f8928b" id="sec.67-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">ensure that a volumetric survey is carried out in June for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f1ecdc6d-1644-4d66-9a66-035e6413d714" id="sec.67-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">each landfill cell where waste has been disposed of since the last volumetric survey required under this subdivision was carried out; and</txt></block></li><li guid="_9796e5a0-8fb5-4a25-93d4-9473c651ce82" id="sec.67-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">all stockpiled waste at the site; and</txt></block></li></list></block></li><li guid="_03017f78-eaae-4a38-b1aa-c66d2805b7df" id="sec.67-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give the chief executive a copy of the results of the volumetric surveys required under <intref check="valid" refid="sec.67-ssec.1-para1.a" target.guid="_aff7e485-ee16-4d42-8782-38a1b5f8928b">paragraph (a)</intref> before the end of July.</txt></block></li></list></block><penalty guid="_43e2bfd2-f59f-4579-8f9c-e63c315168b1" id="sec.67-ssec.1-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_03adf4fb-a5ef-4401-a1e9-d5fe30a88296" id="sec.67-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">This section continues to apply to the operator—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_18d10ca7-4efb-4a0c-a708-798961fdb30a" id="sec.67-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">regardless of whether waste may no longer be delivered to the site; and</txt></block></li><li guid="_2896315e-be52-43af-afba-d74d44ff65a2" id="sec.67-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">even if the site ceases to be a levyable waste disposal site.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_4369751a-e393-477f-a743-375672e6d216" id="sec.67-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, if a matter mentioned in <intref check="valid" refid="sec.67-ssec.2" target.guid="_03adf4fb-a5ef-4401-a1e9-d5fe30a88296">subsection (2)</intref> happens, the carrying out of the survey and the giving of a copy of the results to the chief executive may happen earlier than when otherwise required under <intref check="valid" refid="sec.67-ssec.1" target.guid="_f9bd9494-6402-47bd-8566-8b7b1ba77005">subsection (1)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c1a7274c-ccc7-43bf-b3fd-498b3b04b6bc" id="sec.67-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">This section does not apply to a small site until 1 June 2022.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_504b9a69-4416-406c-9fcb-ee6a8ce7fb0b" id="sec.68" provision.type="other" spent.amends="0"><no>68</no><heading guid="_ff7da268-4d95-4c37-97a0-1a14e9721e6e" id="sec.68-he">Volumetric survey for levyable waste disposal site in non-levy zone in particular circumstances</heading><subclause affected.by.uncommenced="0" guid="_a50c7c7c-0601-4743-aa18-c888f1954c87" id="sec.68-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the operator of a levyable waste disposal site if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6ab9326f-53db-4083-b436-94ecd1ef57d0" id="sec.68-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the site is in the non-levy zone; and</txt></block></li><li guid="_b1c36c1d-5df1-4775-96b9-051a67e12e31" id="sec.68-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">either—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9a9cdcee-3ac5-43d8-9c8e-a09932440b2c" id="sec.68-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">from 1 July 2019 to 31 December 2019—at least 300 tonnes of levyable waste, generated outside the non-levy zone, is received at the site; or</txt></block></li><li guid="_1f0b2973-bd7d-431b-b872-029c9ae82cba" id="sec.68-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">from 1 January 2020—at least 600 tonnes of levyable waste, generated outside the non-levy zone, is received at the site during a year.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5348304b-a43d-4554-9b24-87b4bd331114" id="sec.68-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The operator of the levyable waste disposal site must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2200bb27-d025-49df-b9af-3f4426eebd3e" id="sec.68-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">ensure that a volumetric survey is carried out between 1 January and 30 June of the following year for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8c33357f-7f62-4e16-91d3-8621cf297067" id="sec.68-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">each <b>active</b> landfill cell at the site; and</txt></block></li><li guid="_72177ac8-2d97-41fc-8dcd-3d6f5e754d0f" id="sec.68-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">all stockpiled waste at the site; and</txt></block></li></list></block></li><li guid="_07baaf04-efd3-445f-bdf1-8174f606a0b9" id="sec.68-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give the chief executive a copy of the results of the survey before the end of July in the following year.</txt></block></li></list></block><penalty guid="_f6f2277f-69b0-4e5f-a0a4-751bdca18aee" id="sec.68-ssec.2-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_4d014910-e6f8-48c7-b36c-bb60a1ec0c82" id="sec.68-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The volumetric survey must be carried out in compliance with the requirements applying for volumetric surveys under <intref check="valid" refid="sec.70" target.guid="_dbe8c473-b76d-497a-9d0a-2620102dd03c">section 70</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4f3f0c1d-425e-4a1a-bcce-c65ac32ccc44" id="sec.68-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">This section continues to apply to the operator—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_166d23f3-0b43-465d-ad5b-ef760d6f7e05" id="sec.68-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">regardless of whether waste may no longer be delivered to the site; and</txt></block></li><li guid="_9ee7e244-04ae-4b0b-a3cb-9bb2adb4820b" id="sec.68-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">even if the site ceases to be a levyable waste disposal site.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_aed796e4-fef4-4773-913e-6849c2df1131" id="sec.68-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">However, if a matter mentioned in <intref check="valid" refid="sec.68-ssec.4" target.guid="_4f3f0c1d-425e-4a1a-bcce-c65ac32ccc44">subsection (4)</intref> happens, the carrying out of the survey and the giving of a copy of the results to the chief executive may happen earlier than when otherwise required under <intref check="valid" refid="sec.68-ssec.2" target.guid="_5348304b-a43d-4554-9b24-87b4bd331114">subsection (2)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_32c6a831-1c58-44fe-ae8e-099383341e27" id="sec.68-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">This section does not apply to a small site until 1 June 2022.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8574fffe-fc1f-4b78-a4b5-cd19e953febb" id="sec.69" provision.type="other" spent.amends="0"><no>69</no><heading guid="_0d6c6ae4-2b18-4c66-8901-7c24adc66e7f" id="sec.69-he">Volumetric survey for new landfill cells</heading><subclause affected.by.uncommenced="0" guid="_36e11ab7-647e-4018-b1d2-e685de87a1c8" id="sec.69-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the operator of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d95eccf4-69b9-4603-8a2b-a0915dbe453a" id="sec.69-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a levyable waste disposal site in the waste levy zone; or</txt></block></li><li guid="_b9728385-233c-4a4c-afb0-1853250e6512" id="sec.69-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a levyable waste disposal site in the non-levy zone if at least 600 tonnes of levyable waste generated outside the non-levy zone was received at the site during the preceding 12 months.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_906cab4d-a709-49ac-9064-a334ff9f1133" id="sec.69-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Before a landfill cell is used for the first time for disposing of waste to landfill at the site, the operator of the site must, in compliance with the requirements applying for volumetric surveys under <intref check="valid" refid="sec.70" target.guid="_dbe8c473-b76d-497a-9d0a-2620102dd03c">section 70</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_52fb3527-37d3-4993-a83a-e76040d29377" id="sec.69-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">ensure that a volumetric survey is carried out for the landfill cell; and</txt></block></li><li guid="_a641ab44-f47d-4118-b4b9-9e1b7110ee89" id="sec.69-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">before the end of the month immediately following the month in which the volumetric survey is carried out, give the chief executive a copy of the results of the survey in the approved form.</txt></block></li></list></block><penalty guid="_44a81ade-b742-478e-9f56-4d71549fd3d8" id="sec.69-ssec.2-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_598d7c3c-5b95-419a-aedf-c1fad7f719c4" id="sec.69-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">This section applies whether or not waste has previously been disposed of to landfill at the levyable waste disposal site.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_dbe8c473-b76d-497a-9d0a-2620102dd03c" id="sec.70" provision.type="other" spent.amends="0"><no>70</no><heading guid="_5c446199-7de1-462d-92e5-da505e811624" id="sec.70-he">Requirements for volumetric surveys</heading><subclause affected.by.uncommenced="0" guid="_e02cd683-8371-4b1f-962d-c45b41dc3c98" id="sec.70-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section states the requirements for carrying out volumetric surveys under this subdivision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6e008c98-6214-4a73-a83e-4a29c397cfd2" id="sec.70-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A volumetric survey must be carried out in compliance with the requirements prescribed by regulation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f48b47ca-6a31-4bbd-8be0-d54415a41c19" id="sec.70-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The results of the volumetric survey must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f2c306e0-15f1-4043-8595-8be0d4cf6bfb" id="sec.70-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li guid="_3ed7c141-7049-4e9c-a6ff-3c8fc838c5e6" id="sec.70-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">be accompanied by a topographical plan complying with specifications advised by the chief executive; and</txt></block></li><li guid="_b4a74b11-2df2-4433-b635-d8508820967c" id="sec.70-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">be certified as accurate by a surveyor under the <legref check="valid" jurisd="QLD" target.doc.id="act-2003-070" target.version.series="58bf4472-9a2d-4809-9f04-c4ff625373da" type="act"><name emphasis="yes">Surveyors Act 2003</name></legref>.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_05334fc2-9b01-46f1-a5d9-97c154bd3c50" id="sec.71" provision.type="other" spent.amends="0"><no>71</no><heading guid="_003478cd-7565-4b7e-a953-5478fb6ff0f1" id="sec.71-he">Failure to carry out volumetric survey or give chief executive the results</heading><subclause affected.by.uncommenced="0" guid="_69d678c4-af90-46f9-b885-847871374ac1" id="sec.71-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the operator of a levyable waste disposal site fails—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5b8bdff1-4300-49f4-b860-4394a9d5c436" id="sec.71-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to comply with a requirement under this subdivision to carry out a volumetric survey; or</txt></block></li><li guid="_a725a51c-ad6a-4b97-a286-1cb094f76ad7" id="sec.71-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to give a copy of the results of a volumetric survey to the chief executive.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9d7c293e-a831-4183-886a-e65c667227c1" id="sec.71-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may arrange for the volumetric survey to be carried out at the site and for that purpose may direct an authorised person to enter the site to facilitate the carrying out of the survey.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_60ebb93b-db6a-4065-ab7b-172e379810f0" id="sec.71-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive may recover the reasonable cost of the survey from the operator as a debt payable by the operator to the State.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_eeb4e7b6-266e-48fe-a6c7-b1fdacb20b5d" id="ch.3-pt.5-div.2-sdiv.6"><no>Subdivision 6</no><heading guid="_d8a066b7-5bc8-439a-8ee2-bb08dc3f46b6" id="ch.3-pt.5-div.2-sdiv.6-he">Waste data returns</heading><clause affected.by.uncommenced="0" guid="_d30e771f-e48c-4292-86ed-c1b4fb7d03e1" id="sec.72" provision.type="other" spent.amends="0"><no>72</no><heading guid="_feccdef0-9899-411e-93c2-e1cb1a6e7ce3" id="sec.72-he">Submission of waste data returns</heading><subclause affected.by.uncommenced="0" guid="_ba53cadb-d2d7-444e-889c-bf6ae38c6fe8" id="sec.72-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a levyable waste disposal site must give the chief executive the returns (each a <defterm guid="_b6496079-f9d4-470b-b009-b2a9a5c65d79" id="sec.72-def.wastedatareturn" type="definition">waste data return</defterm>) required of the operator under <intref check="valid" refid="sec.72-ssec.2" target.guid="_0ebcbe25-69a2-42ab-8a1e-bd0ea23554af">subsections (2)</intref> and <intref check="valid" refid="sec.72-ssec.3" target.guid="_416b3033-1b24-4f0c-998d-22489e01ad7b">(3)</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2c27279e-7dcd-4c9b-9f8a-426db568fe7a" id="sec.72-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">by the due date for the site; and</txt></block></li><li guid="_d0c799cd-1f64-4b7e-b1ff-893a29d63e02" id="sec.72-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">in the way decided by the chief executive as published on the department’s website.</txt></block></li></list></block><penalty guid="_a2659083-ffb0-4d7b-879b-df921ed70767" id="sec.72-ssec.1-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_0ebcbe25-69a2-42ab-8a1e-bd0ea23554af" id="sec.72-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Each of the following operators must give the chief executive a summary data return—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6868b057-6fc4-4a08-9782-5e3b6d785a03" id="sec.72-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the operator of a levyable waste disposal site in the waste levy zone;</txt></block></li><li guid="_e7521d8e-b554-4a6e-b1a8-7fadc1ecf8fc" id="sec.72-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the operator of a levyable waste disposal site in the non-levy zone if any levyable waste, generated at a place outside the non-levy zone, is received at the site during the levy period to which the return relates.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_416b3033-1b24-4f0c-998d-22489e01ad7b" id="sec.72-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Each of the following operators must give the chief executive a detailed data return—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cb114e2d-c3e3-42bc-89c9-aee93693fe1b" id="sec.72-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the operator of a levyable waste disposal site in the waste levy zone if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a3c83212-bdf3-4775-8616-2b56d3f73b70" id="sec.72-ssec.3-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the operator is required to hold an environmental authority for the disposal of more than 10,000 tonnes of waste in a year at the site; or</txt></block></li><li guid="_724e3f50-1a0b-4428-8f44-f9a92f6e14b6" id="sec.72-ssec.3-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">from 1 July 2021—the operator is required to hold an environmental authority for the disposal of more than 5,000 tonnes, but not more than 10,000 tonnes, of waste in a year at the site; or</txt></block></li><li guid="_294c2e77-5cb4-440f-a7f1-e52aa4d6be71" id="sec.72-ssec.3-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">from 1 July 2024—the operator is not mentioned in <intref check="valid" refid="sec.72-ssec.3-para1.a-para2.i" target.guid="_a3c83212-bdf3-4775-8616-2b56d3f73b70">subparagraph (i)</intref> or <intref check="valid" refid="sec.72-ssec.3-para1.a-para2.ii" target.guid="_724e3f50-1a0b-4428-8f44-f9a92f6e14b6">(ii)</intref>;</txt></block></li></list></block></li><li guid="_7cb84e01-2d79-4087-912a-6847e642e5c8" id="sec.72-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the operator of a levyable waste disposal site in the non-levy zone if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0d0c4e1d-6c7e-429b-8ae7-a4158b185dc3" id="sec.72-ssec.3-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the operator is required to hold an environmental authority for the disposal of more than 10,000 tonnes of waste in a year at the site; and</txt></block></li><li guid="_95b5002a-dd06-40a1-809c-90f84f20e23c" id="sec.72-ssec.3-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">at least 50 tonnes of levyable waste, generated outside the non-levy zone, is received at the site during the levy period to which the return relates.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f40e6e8f-7871-4c7d-bfe4-139b112c1e5c" id="sec.72-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_2996aa24-4b23-42d9-9806-c07b5e542fda" id="sec.72-ssec.5-def.detaileddatareturn_"><txt break.before="1"><defterm guid="_972e04a1-6808-483d-890e-eb74627d9f87" id="sec.72-ssec.5-def.detaileddatareturn" type="definition">detailed data return</defterm> means a return providing comprehensive information about all movements of waste and other material required to be measured under <intref check="valid" refid="sec.59" target.guid="_753c71b4-2d8f-457c-9d00-64ab00810913">section 59</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_0f5f7ad7-5c1a-4cf7-b8c3-4de75ab31c21" id="sec.72-ssec.5-def.duedate_"><txt break.before="1"><defterm guid="_8a7606c8-836f-4d5b-ba15-aa97c6bd94a8" id="sec.72-ssec.5-def.duedate" type="definition">due date</defterm>, for a levyable waste disposal site, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_82903238-af79-4599-96fe-9025aa136dce" id="sec.72-ssec.5-def.duedate-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the end of the last business day of the month following the end of a levy period for the site; or</txt></block></li><li guid="_6b6c9eac-08c4-44e9-9117-9a4a1beba74b" id="sec.72-ssec.5-def.duedate-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the chief executive grants an extension of time under <intref check="valid" refid="sec.72G" target.guid="_25bd7697-8f66-4737-9010-fb1b7ba7661f">section 72G</intref>, <intref check="valid" refid="sec.72H" target.guid="_26b6ee45-4fd5-46da-a05a-81b879a56db4">72H</intref> or <intref check="valid" refid="sec.72I" target.guid="_6505bdd2-75fc-49ac-b6d9-87388e13897a">72I</intref> for submitting the returns for the site—the end of the extension.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_c66e1223-4098-4629-9754-f9d1cf357796" id="sec.72-ssec.5-def.summarydatareturn_"><txt break.before="1"><defterm guid="_a124ec72-ed33-4b9e-bc0f-30ed3af2095e" id="sec.72-ssec.5-def.summarydatareturn" type="definition">summary data return</defterm> means a return providing a summary of information, required to be measured under <intref check="valid" refid="sec.59" target.guid="_753c71b4-2d8f-457c-9d00-64ab00810913">section 59</intref>, that the chief executive may use to calculate amounts payable for a particular levy period for a levyable waste disposal site.</txt></definition></deflist></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_dbc35e2b-ef22-4c70-9101-8b14bb456060" id="ch.3-pt.5-div.2-sdiv.7"><no>Subdivision 7</no><heading guid="_f6d4fd29-5dc5-43d5-aa37-080911336117" id="ch.3-pt.5-div.2-sdiv.7-he">Record keeping</heading><clause affected.by.uncommenced="0" guid="_77f1a5af-3ef5-4da6-abff-20dcb185001c" id="sec.72A" provision.type="other" spent.amends="0"><no>72A</no><heading guid="_968f668b-eb75-47d3-a09e-693684c788a9" id="sec.72A-he">Operator of levyable waste disposal site to keep particular documents</heading><block><txt break.before="1">The operator of a levyable waste disposal site must keep at the site, or at another place agreed to by the chief executive and the operator, each of the following documents for the period stated for the document—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e4441a60-5e17-433f-b0d1-3d720fc451c2" id="sec.72A-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a copy of a waste data return for 5 years after the return is given to the chief executive;</txt></block></li><li guid="_b44485a3-d7b5-4159-98c8-959e8735b1ae" id="sec.72A-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">records containing any information that was used to support the preparation of a waste data return, including each of the following records, for 5 years after the return is given to the chief executive—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6d1fafb8-d0b1-4dcb-95a0-efc42381610a" id="sec.72A-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">weighbridge records;</txt></block></li><li guid="_f2aaac5c-ebdf-4dde-9155-fad2ae4e13ba" id="sec.72A-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if weight measurement criteria were used—records of vehicles delivering waste to the site;</txt></block></li><li guid="_fba5caef-80c4-451a-9124-3b8f486b70a0" id="sec.72A-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">for small sites that have used an alternative methodology under <intref check="valid" refid="sec.325" target.guid="_c9b3a96d-3c81-423f-981e-08aab11a82c4">section 325</intref>, records that enable the chief executive to fairly work out the total waste levy amount owing for the site in a levy period;</txt></block></li></list></block></li><li guid="_17cbdacb-62cd-4df1-9522-902eb2150e62" id="sec.72A-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a record required to be kept under <intref check="valid" refid="sec.58" target.guid="_389f50f8-6a50-4fc6-82b5-03dc71fa4534">section 58</intref><intref check="valid" refid="sec.58-ssec.3" target.guid="_0bd9ba12-b632-4099-83bf-7f1593ebba73">(3)</intref><intref check="valid" refid="sec.58-ssec.3-para1.b" target.guid="_d63a8080-88d8-4ac8-ba80-7ad453da4488">(b)</intref> and <intref check="valid" refid="sec.65" target.guid="_dbbd9665-2907-4272-9ade-c6776056d494">section 65</intref><intref check="valid" refid="sec.65-ssec.2" target.guid="_510d3888-6300-4bc2-8f42-df3a93d8c3a1">(2)</intref><intref check="valid" refid="sec.65-ssec.2-para1.b" target.guid="_41e8f3f9-0356-4a43-9dad-7a2518f024b4">(b)</intref> for 5 years after the record is made;</txt></block></li><li guid="_2313d43b-3a5c-401d-8b53-0b27ecba697f" id="sec.72A-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a copy of the results of a volumetric survey of a landfill cell at the site for 5 years after the survey is carried out;</txt></block></li><li guid="_89664cca-cebd-4566-afd4-3cb1330fd73d" id="sec.72A-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">a copy of the results of a volumetric survey of stockpiled waste at the site for 5 years after the survey is carried out;</txt></block></li><li guid="_f0565a80-f086-4d02-a042-8ada39bd75f0" id="sec.72A-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">a copy of a notice the operator is required to give the chief executive under this chapter for 5 years after giving the notice;</txt></block></li><li guid="_690afd61-149c-4524-8b1f-a916eeb01f52" id="sec.72A-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">any other record prescribed by regulation for the period prescribed by regulation.</txt></block></li></list><penalty guid="_cf0b5759-df8d-4f6f-90e0-fd5cb5d95e4e" id="sec.72A-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></block></clause></subdivision></division><division affected.by.uncommenced="0" guid="_e349bd3c-30c3-41ee-912b-870906f14787" id="ch.3-pt.5-div.3"><no>Division 3</no><heading guid="_d67ffb0b-ca42-443c-9ca5-124529b3d5ee" id="ch.3-pt.5-div.3-he">Payment options</heading><subdivision affected.by.uncommenced="0" guid="_090e265a-4dd4-4394-ae88-7796db8fecc5" id="ch.3-pt.5-div.3-sdiv.1"><no>Subdivision 1</no><heading guid="_c66fe941-00de-4d4a-b96c-0e9ecfd7adc7" id="ch.3-pt.5-div.3-sdiv.1-he">Waste levy instalment agreements</heading><clause affected.by.uncommenced="0" guid="_fb40b28a-c841-4b72-b812-831af70b5018" id="sec.72B" provision.type="other" spent.amends="0"><no>72B</no><heading guid="_9029a544-211b-4d36-95aa-64830d4488e4" id="sec.72B-he">Waste levy instalment agreement</heading><subclause affected.by.uncommenced="0" guid="_b6265356-63ea-4a67-a3ff-d4f7a052ddd1" id="sec.72B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A <defterm guid="_9f88ad36-0f6e-43b7-ab78-c52b15e46335" id="sec.72B-def.wastelevyinstalmentagreement" type="definition">waste levy instalment agreement</defterm> is an agreement between the operator of a levyable waste disposal site and the chief executive providing for the payment by instalments of a waste levy amount owed by the operator instead of in compliance with the requirements that would otherwise apply under this chapter for the payment of the amount.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7e8cd30e-2325-4567-b4e2-6bbf89ace72f" id="sec.72B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A waste levy instalment agreement may relate to 2 or more levyable waste disposal sites for which the same person is the operator.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7cf038f6-f43e-49e2-8e0e-4e3b4e7dfa53" id="sec.72C" provision.type="other" spent.amends="0"><no>72C</no><heading guid="_97866b13-c717-4374-b3a5-0140a3d1d310" id="sec.72C-he">Application for waste levy instalment agreement</heading><subclause affected.by.uncommenced="0" guid="_f3679cd3-a2de-43db-93cb-16d16301c9e0" id="sec.72C-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a levyable waste disposal site may apply to the chief executive to enter into a waste levy instalment agreement for a waste levy amount the operator must pay the State.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_438d2fcf-03f5-4542-96e0-861f6eb07d44" id="sec.72C-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application must be in the approved form and be accompanied by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a45eebda-0e3f-47d4-b316-0cace4ba8d29" id="sec.72C-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a description of the operator’s financial situation that caused the operator’s inability to pay the waste levy amount by the due date for payment and how the financial situation came about; and</txt></block></li><li guid="_2ece5d32-75b2-43f2-91f3-189557c3b348" id="sec.72C-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">up-to-date management and financial records to verify the information given under <intref check="valid" refid="sec.72C-ssec.2-para1.a" target.guid="_a45eebda-0e3f-47d4-b316-0cace4ba8d29">paragraph (a)</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d8345d5f-95fd-4ccb-9f42-0f499b314c48" id="sec.72C-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive must, within 20 days after receiving the application, decide either to grant or to refuse the application and—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c0a9ebc3-7ccf-43cc-a7a7-53154d6a0533" id="sec.72C-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the decision is to grant the application—give the operator a notice stating—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_932cad01-4c81-4a5e-bd0a-1f4b8383f5f9" id="sec.72C-ssec.3-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the terms of the waste levy instalment agreement; and</txt></block></li><li guid="_98da3490-1920-4810-9c55-e2118d7911cb" id="sec.72C-ssec.3-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the period within which all waste levy amounts must be paid under the waste levy instalment agreement; or</txt></block></li></list></block></li><li guid="_8e98f97d-a332-43a7-a09e-d74b2b3948b8" id="sec.72C-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the decision is to refuse the application—give the operator an information notice for the decision.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b451c085-e672-490b-a95a-f0866943cd5b" id="sec.72C-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive may grant the application only if satisfied the applicant has demonstrated—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6904bdf9-7249-4962-a102-782c3be2d1e7" id="sec.72C-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an inability to pay the waste levy amount within the time required under this chapter; and</txt></block></li><li guid="_b5706ff9-29f7-416b-8596-0802d17e95b8" id="sec.72C-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">how entering into the waste levy instalment agreement will allow the applicant to pay the waste levy amount while at the same time allowing the applicant to pay future waste levy amounts.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ea923caa-3553-4852-9642-bcda9ce76526" id="sec.72C-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">However—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9eb1b51e-516d-4e97-82bf-4a96de79074b" id="sec.72C-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">there may be only 1 waste levy instalment agreement in force between the operator of a levyable waste disposal site and the chief executive at any time; and</txt></block></li><li guid="_4a15b331-5b57-4421-ab65-65bf329ae327" id="sec.72C-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">only 1 waste levy instalment agreement may be entered into between the operator of a levyable waste disposal site and the chief executive in a financial year; and</txt></block></li><li guid="_ed2631ca-d496-4d58-af6f-8de183e06027" id="sec.72C-ssec.5-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the period within which all waste levy amounts must be paid under the waste levy instalment agreement must not be longer than 6 months after the agreement is entered into.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5dfc6cb9-e2fe-4011-9151-aace6fab5f1a" id="sec.72C-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">A failure to make a decision within the period required is taken to be a decision by the chief executive to refuse the application.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_65cc629b-ed5c-4d69-a28e-a7631b3542a3" id="sec.72D" provision.type="other" spent.amends="0"><no>72D</no><heading guid="_7bf255f0-3103-441f-bb3f-e9aa414b7531" id="sec.72D-he">Amendment of waste levy instalment agreement</heading><subclause affected.by.uncommenced="0" guid="_485eacd1-c907-4a16-bc1c-3ec81d2c7f37" id="sec.72D-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a levyable waste disposal site may apply to the chief executive for an amendment of a waste levy instalment agreement to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f0a4bee0-8569-415f-96ce-8d2b0d743ca7" id="sec.72D-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">include an additional waste levy amount; or</txt></block></li><li guid="_55a7142a-589b-484e-acd3-7b013ee08642" id="sec.72D-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">extend the period for the repayment of the total waste levy amount the subject of the agreement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_80199ca5-94a6-47ab-8338-7dfa431872e3" id="sec.72D-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6aeb58b9-66fb-4e02-a505-c07ee7ce949b" id="sec.72D-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">any additional waste levy amount must not be greater than 10% of the total waste levy amount owing by the operator when the application is made, other than an amount already the subject of the agreement; and</txt></block></li><li guid="_ce68750a-a333-4825-a4cb-6ec95b41cf0e" id="sec.72D-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the period of any extension must not be more than 3 months; and</txt></block></li><li guid="_4076b260-1fba-43de-ae12-c320c5ada652" id="sec.72D-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the operator must not have previously made an application for the amendment of the waste levy instalment agreement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f14436af-2176-4a1a-928c-90f24cad964a" id="sec.72D-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The application must be in the approved form and state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bf9ea9e7-6b81-4cb3-a765-2a21765f5962" id="sec.72D-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">any additional waste levy amount sought to be included in the agreement; and</txt></block></li><li guid="_0c5fc831-3149-4ddc-8314-4a514ffa4ead" id="sec.72D-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the length of any extension sought; and</txt></block></li><li guid="_55bd59db-3ec9-48eb-8444-79f8f2cda3a7" id="sec.72D-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the changes in the applicant’s circumstances that have caused the applicant to seek the amendment.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_4c7b4304-c94d-4976-a136-eea7d7f4b26d" id="sec.72D-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive must, within 20 days after receiving the application, decide either to grant or to refuse the application and—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_27203fe9-731e-450c-8c3a-03896751948d" id="sec.72D-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the decision is to grant the application—give the operator a notice stating—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9a41213d-be60-43bd-8b94-2fac22a49812" id="sec.72D-ssec.4-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the terms of the amended waste levy instalment agreement; and</txt></block></li><li guid="_af8f8c57-0e89-48a8-bfd6-95605025ae5b" id="sec.72D-ssec.4-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the period within which all waste levy amounts must be paid under the amended waste levy instalment agreement; or</txt></block></li></list></block></li><li guid="_1c715619-9225-4079-b270-8ab80fd9bd6e" id="sec.72D-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the decision is to refuse the application—give the operator an information notice for the decision.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_129f94af-b7f2-4da1-b789-ed74e4dbea1c" id="sec.72D-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The chief executive may grant the application only if satisfied the applicant has demonstrated—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_11bbbe25-aee0-4f6e-9682-f76752007ce1" id="sec.72D-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an inability to pay waste levy amounts owing within the time provided for in the agreement; and</txt></block></li><li guid="_7ee7a604-adbc-45da-a95a-e08224cf4c7e" id="sec.72D-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">how amendment of the agreement will allow the applicant to pay all waste levy amounts owing and future waste levy amounts.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_93cb48cf-177e-4470-9b22-321479383ce8" id="sec.72D-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The making of an application under this section does not of itself affect the applicant’s obligations under the waste levy instalment agreement sought to be amended.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_62e077d3-0032-4b74-a7df-75a679685186" id="sec.72E" provision.type="other" spent.amends="0"><no>72E</no><heading guid="_e8686dfe-64fd-486c-911b-22391ba42d1c" id="sec.72E-he">Interest affected by waste levy instalment agreement</heading><subclause affected.by.uncommenced="0" guid="_9fb82fed-3710-4e97-bf4f-b3331524e957" id="sec.72E-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0"><intref check="valid" refid="sec.72E-ssec.2" target.guid="_3cfea394-494c-4c56-9be6-202c5b070817">Subsection (2)</intref> applies for a waste levy instalment agreement if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_980337dc-d194-428b-ab9c-14f9a2f739b0" id="sec.72E-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the application for the agreement was made after the due date for payment of a waste levy amount the subject of the application; and</txt></block></li><li guid="_54550add-a556-4ad9-b24e-f8ddeefc5454" id="sec.72E-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the agreement is entered into.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3cfea394-494c-4c56-9be6-202c5b070817" id="sec.72E-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Interest is payable under this chapter up to the day the application was made and must be paid on or before the due date for payment of the next waste levy amount.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_427495ac-5b1d-4f0f-9585-ef86c31eb6c1" id="sec.72E-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If an application for a waste levy instalment agreement is refused, the requirements under this chapter for the payment of interest continue to apply unaffected by the making or refusal of the application.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1a998329-b46c-4fe8-965b-e0011332fd2a" id="sec.72F" provision.type="other" spent.amends="0"><no>72F</no><heading guid="_e8dfd7d6-28c9-47fb-87da-d7cad7c0ec2f" id="sec.72F-he">Failure to pay an instalment under waste levy instalment agreement</heading><subclause affected.by.uncommenced="0" guid="_a3f93fad-7b9d-4f10-94d0-00d86e116f0a" id="sec.72F-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If an instalment of a waste levy amount is not paid on or before an instalment day under a waste levy instalment agreement—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c831f78f-7693-4ee9-9e23-de8e24be84ca" id="sec.72F-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the waste levy instalment agreement is taken to be no longer in force; and</txt></block></li><li guid="_9af51d8c-edd8-4ebe-8855-84e1256b1988" id="sec.72F-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the due date for payment of any waste levy amount provided for in the agreement becomes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b7541f9b-b361-4c1d-ab10-60e9c88dde1a" id="sec.72F-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">if the amount, apart from the agreement, would have been required to be paid on a day later than the instalment day—the later day; or</txt></block></li><li guid="_11306f79-af17-478a-bc5e-3c6af65db0ce" id="sec.72F-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the amount, apart from the agreement, would have been required to be paid on a day earlier than the instalment day—the day after the instalment day, or if that day is not a business day, the next business day; and</txt></block></li></list></block></li><li guid="_de3a3f55-2211-4135-9096-fce1f392c557" id="sec.72F-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">for an amount mentioned in <intref check="valid" refid="sec.72F-ssec.1-para1.b" target.guid="_9af51d8c-edd8-4ebe-8855-84e1256b1988">paragraph (b)</intref><intref check="valid" refid="sec.72F-ssec.1-para1.b-para2.ii" target.guid="_11306f79-af17-478a-bc5e-3c6af65db0ce">(ii)</intref>, interest becomes payable on the amount as if the waste levy instalment agreement had not been entered into, but only on and from the day after the instalment day, whether or not the day after the instalment day is a business day.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2ddfe5da-7864-461f-b131-eed344676969" id="sec.72F-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_50b5e2b8-0d89-41c9-a140-44628635c5bc" id="sec.72F-ssec.2-def.instalmentday_"><txt break.before="1"><defterm guid="_eb22b86e-ec7c-4234-b340-b14c933f0390" id="sec.72F-ssec.2-def.instalmentday" type="definition">instalment day</defterm>, under a waste levy instalment agreement, means a day when a payment is due under the agreement.</txt></definition></deflist></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_839b80ed-3ce3-4b2e-b485-89560940314f" id="ch.3-pt.5-div.3-sdiv.2"><no>Subdivision 2</no><heading guid="_b4cf4e64-f240-4a3f-b156-11d00967302e" id="ch.3-pt.5-div.3-sdiv.2-he">Extension of time</heading><clause affected.by.uncommenced="0" guid="_25bd7697-8f66-4737-9010-fb1b7ba7661f" id="sec.72G" provision.type="other" spent.amends="0"><no>72G</no><heading guid="_27144f9f-3ef2-48f9-87a3-f0eda9ecd2e7" id="sec.72G-he">Application for extension of time to pay waste levy amount</heading><subclause affected.by.uncommenced="0" guid="_133fe5c9-525e-41d0-88f3-979ac4a64608" id="sec.72G-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a levyable waste disposal site may apply to the chief executive for an extension of time to pay a waste levy amount if the operator believes the operator can not pay the amount by the due date for payment of the amount.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_551ef2bb-182a-4f3f-9ab0-24f9edecfa70" id="sec.72G-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_106632f3-3877-4750-9e9d-529e383c8119" id="sec.72G-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the extension of time can not be for more than 1 month; and</txt></block></li><li guid="_dd485f7c-cd73-4364-8b14-f8448282a814" id="sec.72G-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the operator can not apply for the extension of time if the operator is conducting operations at the site for which the operator does not hold an environmental authority; and</txt></block></li><li guid="_cb03902c-c4eb-4f2c-938d-593a68017fcf" id="sec.72G-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the operator can not make more than—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8aac30b0-3a14-43b0-9a8f-39b013948a7d" id="sec.72G-ssec.2-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">1 application for an extension of time under this section or <intref check="valid" refid="sec.72H" target.guid="_26b6ee45-4fd5-46da-a05a-81b879a56db4">section 72H</intref> for the payment of the same waste levy amount; or</txt></block></li><li guid="_a0588d3f-7f8f-44a1-943f-1a2d77fb9911" id="sec.72G-ssec.2-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">2 applications under this section or <intref check="valid" refid="sec.72H" target.guid="_26b6ee45-4fd5-46da-a05a-81b879a56db4">section 72H</intref> in a financial year.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_266eb248-1b24-4cb7-b348-2062b92cff65" id="sec.72G-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The application must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e63eac7c-d68d-4975-ad12-25023c758151" id="sec.72G-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be made before the due date for payment of the waste levy amount; and</txt></block></li><li guid="_dc6bc673-a0d9-4ef3-bfe1-38fba5b1c867" id="sec.72G-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state the reasons why the extension is being applied for.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2f90f013-6d47-474b-902e-b093d29201da" id="sec.72G-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive must, within 5 business days after the due date for payment of the waste levy amount, decide either to grant or to refuse the application and—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a0e0f865-affc-4c43-abc2-4ec4e3053fa4" id="sec.72G-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the decision is to grant the application—give the applicant a notice stating a new due date for payment of the waste levy amount; or</txt></block></li><li guid="_a2056b62-27e3-4b9b-bae2-456c998a3eb8" id="sec.72G-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the decision is to refuse the application—give the applicant an information notice for the decision.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_445247dd-4ed9-4d32-b3fb-07f196acdf08" id="sec.72G-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The chief executive may grant the application only if satisfied that it is not reasonable to expect the applicant to pay the waste levy amount by the due date for payment.</txt></block><note guid="_232131d8-5f49-41d4-b19b-eb0d8e248d7b" id="sec.72G-ssec.5-note" type="example"><heading guid="_22631b78-d26b-4e7b-9525-6d9788ecb17d" id="sec.72G-ssec.5-note-he">Example of when the chief executive may grant an application—</heading><block><txt break.before="1">The operator has suffered a significant disruption to electricity supply or an extensive computer malfunction.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_b86d1445-118e-4072-a051-93591d4f8140" id="sec.72G-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">A failure to make a decision within the period required is taken to be a decision by the chief executive to refuse the application.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_26b6ee45-4fd5-46da-a05a-81b879a56db4" id="sec.72H" provision.type="other" spent.amends="0"><no>72H</no><heading guid="_b91e4ea1-598c-410e-ad98-c66de84ebab5" id="sec.72H-he">Application for extension of time to submit waste data return and pay waste levy amount </heading><subclause affected.by.uncommenced="0" guid="_971053ed-0db3-40bb-88fb-8aea42423ee8" id="sec.72H-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a levyable waste disposal site may apply to the chief executive for an extension of time to submit a waste data return and pay a waste levy amount if the operator considers the operator can not pay the amount by the due date for payment of the amount.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a13ea91b-241a-4a80-bbe0-998200733072" id="sec.72H-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6f7bb417-e9de-4155-90ff-85f46f011f97" id="sec.72H-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the extension of time can not be for more than 1 month after—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b26cc0f3-0194-41d8-b7d4-4e75dd872c81" id="sec.72H-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">for submission of the waste data return—the due date for submission of the return; or</txt></block></li><li guid="_e35dd5b5-49fc-4e1b-9d56-d93c09afc0bd" id="sec.72H-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">for payment of the waste levy amount—the due date for payment of the amount; and</txt></block></li></list></block></li><li guid="_f537f0d9-c874-4cb0-a91d-561d1d171981" id="sec.72H-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the operator can not apply for the extension of time if the operator is conducting operations at the site for which the operator does not hold an environmental authority; and</txt></block></li><li guid="_ba2d9369-b28c-497f-bf34-f9115c282aa1" id="sec.72H-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the operator can not make more than—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0cde7283-d4be-4cb7-b36e-f79c168bc72d" id="sec.72H-ssec.2-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">1 application for an extension of time under this section or <intref check="valid" refid="sec.72G" target.guid="_25bd7697-8f66-4737-9010-fb1b7ba7661f">section 72G</intref> for the payment of the same waste levy amount; or</txt></block></li><li guid="_10267240-fa09-4701-9c5d-b2d61b0565ac" id="sec.72H-ssec.2-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">2 applications under this section or <intref check="valid" refid="sec.72G" target.guid="_25bd7697-8f66-4737-9010-fb1b7ba7661f">section 72G</intref> in a financial year.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7e50674e-9719-4bb5-a9d6-c8ff57404382" id="sec.72H-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The application must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_390f8dc1-7c5a-4ddd-a8b2-36f7489b3c1e" id="sec.72H-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be made by the due date for the submission of the waste data return for the site; and</txt></block></li><li guid="_c7a1e23a-4047-43c3-872a-36ba961a42c0" id="sec.72H-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state the reasons why the extension is being applied for.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_99b26c3f-61e7-4e7a-b5a9-f5cb1d7bc035" id="sec.72H-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive must, within 5 business days after the due date for the submission of the waste data return for the site, decide either to grant or to refuse the application and—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1f93e3b1-cd12-4664-8bff-496cc9453b62" id="sec.72H-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the decision is to grant the application—give the applicant a notice stating a new day by which the waste data return must be submitted and the new date by which the waste levy amount must be paid; or</txt></block></li><li guid="_06c4d96b-463e-410a-aaea-7f09e68dcb70" id="sec.72H-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the decision is to refuse the application—give the applicant an information notice for the decision.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6764c3d0-e754-4375-baf3-4d5b7016c54d" id="sec.72H-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The chief executive may grant the application only if satisfied that it is not reasonable to expect the applicant to pay the waste levy amount by the due date for payment.</txt></block><note guid="_b2212b80-a0b6-4fc8-82bf-1830c72ca29e" id="sec.72H-ssec.5-note" type="example"><heading guid="_42b52a00-8277-48b3-953e-19f8765eb9e6" id="sec.72H-ssec.5-note-he">Example of when the chief executive may grant an application—</heading><block><txt break.before="1">The operator has suffered a significant disruption to electricity supply or an extensive computer malfunction.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_f4e8b750-e9f9-4f51-af6d-0240d99eed17" id="sec.72H-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">A failure to make a decision within the period required is taken to be a decision by the chief executive to refuse the application.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_6505bdd2-75fc-49ac-b6d9-87388e13897a" id="sec.72I" provision.type="other" spent.amends="0"><no>72I</no><heading guid="_07ce7173-a28a-409a-b674-7dde136dee0f" id="sec.72I-he">Public notice granting extension of time to submit waste data return and pay waste levy amount</heading><subclause affected.by.uncommenced="0" guid="_14ae9a40-15fd-41fc-9c5a-faf437e4845c" id="sec.72I-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may by publication on the department’s website grant an extension of time to the operators of stated levyable waste disposal sites to do either of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3db59d64-07fa-42b4-a77b-3eecf9c3c614" id="sec.72I-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">pay a waste levy amount;</txt></block></li><li guid="_4492b0e4-40d8-4dd8-9c8c-654edba1eba7" id="sec.72I-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">submit a waste data return and pay a waste levy amount.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_10396b05-5285-4a70-acf2-8a81a481d2cb" id="sec.72I-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may grant an extension under this section only if satisfied that the extension is justified because of a significant emergency.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_8714ec42-c427-4b3f-9573-de5fa277a629" id="ch.3-pt.5-div.3-sdiv.3"><no>Subdivision 3</no><heading guid="_918d305c-fafa-4427-96fb-7d6e0a6073d3" id="ch.3-pt.5-div.3-sdiv.3-he">Chief executive’s estimation of waste levy amount</heading><clause affected.by.uncommenced="0" guid="_a196da48-85f4-4d6d-bb76-bbea8156fc11" id="sec.72J" provision.type="other" spent.amends="0"><no>72J</no><heading guid="_37b22bda-ac6c-488f-986d-ef0640104e14" id="sec.72J-he">Estimation of waste levy amount payable by operator of levyable waste disposal site</heading><subclause affected.by.uncommenced="0" guid="_3b6a4467-34cd-408b-bf62-19d8638f69c1" id="sec.72J-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may decide an estimate of the waste levy amount payable by the operator of a levyable waste disposal site for a particular period (the <defterm guid="_e723a5bb-70e0-4121-90a3-d071c9a25292" id="sec.72J-def.estimatedwastelevyamount" type="definition">estimated waste levy amount</defterm>) if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e6fdde2c-2511-4e41-80a7-18f6dd27b8e9" id="sec.72J-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the operator did not give the chief executive a waste data return by the due date for the site under <intref check="valid" refid="sec.72" target.guid="_d30e771f-e48c-4292-86ed-c1b4fb7d03e1">section 72</intref>; or</txt></block></li><li guid="_31918e96-5de0-4fc4-bdbc-2f4be07de3a3" id="sec.72J-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the operator gave the chief executive information, whether or not in the form of a waste data return, that the chief executive considers on reasonable grounds to be incomplete or inaccurate; or</txt></block></li><li guid="_e3ea6074-a5a1-480e-9bde-3d7812d6e727" id="sec.72J-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the chief executive is satisfied on reasonable grounds that the waste levy amount payable by the operator for the period is incorrect.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b88a45c2-dbed-4483-b080-aea3393e9c2b" id="sec.72J-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the chief executive decides an estimated waste levy amount for the operator—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fb8b2600-f10e-46cc-ab7a-1dd7ad5c425c" id="sec.72J-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that amount becomes the waste levy amount payable by the operator for the period; and</txt></block></li><li guid="_7a96b276-e4b7-4892-a375-bccc1ddc6fc8" id="sec.72J-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the chief executive must give the operator an information notice for the decision.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_80e6542b-2030-443f-9ffc-a945b71fe09d" id="sec.72J-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">To remove any doubt, it is declared that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_692e98fb-edc6-4307-a0c5-005744d0acc7" id="sec.72J-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the chief executive may act under this section even if the due date for payment of the waste levy amount payable has passed; and</txt></block></li><li guid="_f581b83d-122e-49ce-a1cd-90a50427cce6" id="sec.72J-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the chief executive deciding an estimate of the waste levy amount payable by the operator for a period under this section does not change the due date for payment of the amount; and</txt></block></li><li guid="_5a732717-3d26-427f-b8f5-a96d856dbb8a" id="sec.72J-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">nothing in this section stops a subsequent adjustment being made to the waste levy amount payable by the operator for the period if a different amount is decided under a review of the chief executive’s decision on the estimated waste levy amount.</txt></block></li></list></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_51941c53-5ead-4788-9463-c69e65d37993" id="ch.3-pt.5-div.3-sdiv.4"><no>Subdivision 4</no><heading guid="_d9c04d7e-2e89-4c39-a31e-733a5dd9ea91" id="ch.3-pt.5-div.3-sdiv.4-he">Bad debt credit</heading><clause affected.by.uncommenced="0" guid="_495ed80c-7789-4629-b81a-9e5c758c095f" id="sec.72K" provision.type="other" spent.amends="0"><no>72K</no><heading guid="_f9ee3304-c1d1-49b9-aa94-adae3c69b293" id="sec.72K-he">Eligibility for bad debt credit after insolvency or bankruptcy of customer</heading><subclause affected.by.uncommenced="0" guid="_11308217-c1df-402d-9398-4240d743504e" id="sec.72K-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a waste disposal site is eligible for a credit (a <defterm guid="_230566a2-135d-47f9-b6e4-3476cbc3826c" id="sec.72K-def.baddebtcredit" type="definition">bad debt credit</defterm>) for the waste levy amount payable by the operator on an amount of waste delivered to the site if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b2d98de1-5859-4e1f-8095-e06742b7ca84" id="sec.72K-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the operator was the operator of the site when the waste was delivered; and</txt></block></li><li guid="_c9d00968-580a-42d6-80a1-d72f9e718c15" id="sec.72K-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the waste was delivered to the site by another person (the <defterm guid="_ce2f8315-172b-4438-b343-1e7224de6515" id="sec.72K-ssec.1-def.customer" type="definition">customer</defterm>) for consideration in money; and</txt></block></li><li guid="_c4f2441f-70a1-4f2b-b54b-69a4f081f441" id="sec.72K-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the operator included the waste in a summary data return for the site for the levy period in which the waste was delivered; and</txt></block></li><li guid="_72c51c23-55f5-4eea-b499-f488374233d6" id="sec.72K-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the operator paid the waste levy amount; and</txt></block></li><li guid="_e43d7d30-6a22-4f51-9c31-c166a2e47566" id="sec.72K-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the operator issued an invoice to the customer for the delivery within 30 days after the waste was delivered to the site and— </txt><list number.type="manual" unnumbered.indent="0"><li guid="_65376a2d-2634-49e5-9f65-25b65d57caa2" id="sec.72K-ssec.1-para1.e-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the invoice expressly included a service delivery charge for the operator’s obligation to pay waste levy on the waste when delivered to the site; and</txt></block></li><li guid="_05b8661b-2d54-424b-960e-088d36cacc1e" id="sec.72K-ssec.1-para1.e-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the service delivery charge, excluding any component for GST, was not more than the waste levy amount; and</txt></block></li></list></block></li><li guid="_3f4260a2-6458-4d83-a140-3a29782a8659" id="sec.72K-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">the customer failed to pay the operator all or part of the amount due for delivery of the waste within 30 days after being given an invoice for the amount; and</txt></block></li><li guid="_76b7bec0-935b-4cd6-b58a-633d04961f4a" id="sec.72K-ssec.1-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">the customer became insolvent within 12 months after the delivery of the waste to the site; and</txt></block></li><li guid="_b169c500-9d55-4c58-a57f-77cdf8baa271" id="sec.72K-ssec.1-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">the operator has been unable to recover the amount owing from the customer despite having taken reasonable steps to do so; and</txt></block></li><li guid="_a31e42ca-2e54-4a66-8a58-855631072fcf" id="sec.72K-ssec.1-para1.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the operator has offset against the amount owing by the customer any amount owed by the operator to the customer that may be set off against that amount; and</txt></block></li><li guid="_c64d31b8-9c0a-44aa-9243-741740621d83" id="sec.72K-ssec.1-para1.j" provision.type="other"><no>(j)</no><block><txt break.before="0">the operator has reduced the amount owing by the value of any enforceable security the operator holds in relation to the customer but an amount remains outstanding in relation to the delivery; and</txt></block></li><li guid="_ce63c5ad-8944-46fb-9b84-4b834b8b7410" id="sec.72K-ssec.1-para1.k" provision.type="other"><no>(k)</no><block><txt break.before="0">the operator has submitted all the waste data returns and paid all waste levy owing by the operator when applying for the bad debt credit.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f07d3808-428d-497b-ac89-edb8b568f038" id="sec.72K-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the operator is not eligible for the bad debt credit if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_511849f2-b023-4efc-8b25-daf71c1b9820" id="sec.72K-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the operator and the customer are, or were when the waste was delivered, related entities; or</txt></block></li><li guid="_99e69af9-d3c5-4a98-ae93-ae6ca8da8e0a" id="sec.72K-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">it is for an amount of waste delivered to the site while the customer continued to owe the operator an amount, for a previous delivery of waste, more than 30 days after being given an invoice for the previous delivery; or</txt></block></li><li guid="_7f6beb3c-aae0-4e28-80d7-51ce878f3b15" id="sec.72K-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the operator has previously received a bad debt credit for the relevant delivery of the waste.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a90ac2d4-dc71-4794-85b2-751585f8055d" id="sec.72K-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A person is a <defterm guid="_05f1d1d3-2ca5-4bfd-8874-93d278be2e06" id="sec.72K-def.relatedentity" type="definition">related entity</defterm> for another person if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1f1916dc-9a0a-4335-b563-91f3702bef71" id="sec.72K-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for individuals—they are members of the same family; or</txt></block></li><li guid="_4a77ce2f-0f7d-4c58-afdf-57715343d780" id="sec.72K-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for an individual and a corporation—the individual or a member of the individual’s family—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ab4af9db-3bbf-49e6-9d88-38dea847d8be" id="sec.72K-ssec.3-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">is a majority shareholder, director or secretary of the corporation or a related body corporate of the corporation; or</txt></block></li><li guid="_0b517625-f420-4619-9150-13d3ac3df58f" id="sec.72K-ssec.3-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">has an interest of 50% or more in the corporation; or</txt></block></li></list></block></li><li guid="_1124c3a5-e08a-427a-a687-38224c9fbeca" id="sec.72K-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">for an individual and a trustee of a trust—the individual or a related entity under another provision of this section is a beneficiary of the trust; or</txt></block></li><li guid="_1290ce08-8aee-4c67-9a08-f9c14dcd1671" id="sec.72K-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">for corporations—they are related bodies corporate; or</txt></block></li><li guid="_36850af5-cb81-458a-904c-5cc9d063e840" id="sec.72K-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">for a corporation and a trustee of a trust—the corporation or a related entity under another provision of this section is a beneficiary of the trust; or</txt></block></li><li guid="_ee1855a3-6080-4698-b2a5-dc62cf991c16" id="sec.72K-ssec.3-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">for trustees of 2 or more trusts—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8658bce4-8495-4fec-8f29-2108417eebe9" id="sec.72K-ssec.3-para1.f-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a person is a beneficiary of both trusts; or</txt></block></li><li guid="_6ae40e30-34df-46cf-b7dc-2381c5eb7a59" id="sec.72K-ssec.3-para1.f-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a person is a beneficiary of 1 trust and a related entity under another provision of this section is a beneficiary of the other trust.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a2f2c947-bc82-4b22-9a0d-7553079dc15b" id="sec.72K-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_049f67a3-5cfe-48e6-bf6b-2e400a74dae5" id="sec.72K-ssec.4-def.family_"><txt break.before="1"><defterm guid="_4237670e-a866-4652-9049-1b3660792523" id="sec.72K-ssec.4-def.family" type="definition">family</defterm>, for a person, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a03b05a0-227f-460c-a931-2a6f6436bdc2" id="sec.72K-ssec.4-def.family-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the person’s spouse; or</txt></block></li><li guid="_4d36539f-6b3d-4bbb-820e-4426f375c57e" id="sec.72K-ssec.4-def.family-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a parent of the person or the person’s spouse; or</txt></block></li><li guid="_7b440d6b-31d2-4481-891d-e76be52977c6" id="sec.72K-ssec.4-def.family-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a grandparent of the person or the person’s spouse; or</txt></block></li><li guid="_2b181752-410b-4943-8ec5-c7249f8033cd" id="sec.72K-ssec.4-def.family-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a brother, sister, nephew or niece of the person or the person’s spouse; or</txt></block></li><li guid="_cc8293c8-14e4-4bda-8b18-99773802cafd" id="sec.72K-ssec.4-def.family-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">a child of the person or the person’s spouse; or</txt></block></li><li guid="_25e46251-0d00-406a-8ebe-6877edb55605" id="sec.72K-ssec.4-def.family-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">a grandchild of the person; or</txt></block></li><li guid="_e6eba0ec-83d1-459f-8eb1-f76cdc95cc1f" id="sec.72K-ssec.4-def.family-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">the spouse of any person mentioned in <intref check="valid" refid="sec.72K-ssec.4-def.family-para1.b" target.guid="_4d36539f-6b3d-4bbb-820e-4426f375c57e">paragraphs (b)</intref> to <intref check="valid" refid="sec.72K-ssec.4-def.family-para1.f" target.guid="_25e46251-0d00-406a-8ebe-6877edb55605">(f)</intref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_4c3473c9-6667-4804-adae-3e65c709dab2" id="sec.72K-ssec.4-def.insolvent_"><txt break.before="1"><defterm guid="_9fcee169-5455-4606-9a7c-753dffece12f" id="sec.72K-ssec.4-def.insolvent" type="definition">insolvent</defterm> means insolvent under the <legref check="invalid" jurisd="QLD" type="act"><name emphasis="no">Corporations Act</name></legref>, <legref check="invalid" jurisd="QLD" refid="sec.95A" type="act">section 95A</legref><legref check="invalid" jurisd="QLD" refid="sec.95A-ssec.2" type="act">(2)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_ffc6a528-9fb5-403a-bcd6-ce8f7fd0e8e7" id="sec.72K-ssec.4-def.operator_"><txt break.before="1"><defterm guid="_c3b400fd-8dbf-4f5e-be53-f44a6a86bf54" id="sec.72K-ssec.4-def.operator" type="definition">operator</defterm>, of a waste disposal site, includes a former operator of the site.</txt></definition><definition affected.by.uncommenced="0" guid="_bd0e3d84-cf8d-4814-8fc5-c32563a51fc8" id="sec.72K-ssec.4-def.relatedbodycorporate_"><txt break.before="1"><defterm guid="_8e7137f2-0ef9-4680-b7d2-be8397000120" id="sec.72K-ssec.4-def.relatedbodycorporate" type="definition">related body corporate</defterm> see the <legref check="invalid" jurisd="QLD" type="act"><name emphasis="no">Corporations Act</name></legref>, <legref check="invalid" jurisd="QLD" refid="sec.50" type="act">section 50</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_2a62f384-6987-4f4f-b2be-138dcaee4944" id="sec.72K-ssec.4-def.summarydatareturn_"><txt break.before="1"><defterm guid="_a01f3f9f-eb4a-475b-a555-7e8e075fa0eb" id="sec.72K-ssec.4-def.summarydatareturn" type="definition">summary data return</defterm> see <intref check="valid" refid="sec.72" target.guid="_d30e771f-e48c-4292-86ed-c1b4fb7d03e1">section 72</intref><intref check="valid" refid="sec.72-ssec.5" target.guid="_f40e6e8f-7871-4c7d-bfe4-139b112c1e5c">(5)</intref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_ec9d774f-c0d8-47db-b1b7-78e37a393747" id="sec.72L" provision.type="other" spent.amends="0"><no>72L</no><heading guid="_3ad63591-aa7d-4e81-a611-3fe18c178fc3" id="sec.72L-he">Application for bad debt credit</heading><subclause affected.by.uncommenced="0" guid="_b793e17c-0bd7-4070-9631-2b82ae8164af" id="sec.72L-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator or former operator of a waste disposal site who is eligible for a bad debt credit may apply to the chief executive for relief.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6d34de72-3bca-4459-938c-9c430481c2c7" id="sec.72L-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b4993819-f446-4efa-885c-c87e47b2ed2b" id="sec.72L-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li guid="_547209a0-c4e1-4a55-95ac-6704861cf8c8" id="sec.72L-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">be supported by enough information to allow the chief executive to decide the application.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_780591fe-c2bf-487f-a63a-a97892e745bb" id="sec.72M" provision.type="other" spent.amends="0"><no>72M</no><heading guid="_81e8b011-6e6e-4f63-ac91-4759a56aeb85" id="sec.72M-he">Chief executive may require additional information or documents</heading><subclause affected.by.uncommenced="0" guid="_58435597-5d28-42d2-845e-17594e077ea3" id="sec.72M-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Within 28 days after receiving a bad debt credit application, the chief executive may, by notice given to the applicant, require the applicant to give the chief executive further reasonable information or documents about the application by a reasonable day stated in the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a19a56e9-257c-437d-921f-40fac486ad31" id="sec.72M-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The applicant may, before the stated day, agree with the chief executive about extending the time for providing the further information or documents.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_caed4021-b579-426d-a837-4c59c2fa2317" id="sec.72M-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The application is taken to be withdrawn if the applicant does not give the chief executive the further information or documents by the stated day or the end of any extension agreed between the chief executive and the applicant.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d98f1118-a1a2-413b-a386-470743c0830a" id="sec.72N" provision.type="other" spent.amends="0"><no>72N</no><heading guid="_8798ea91-262b-4f97-b3b7-dac8a26c3812" id="sec.72N-he">Deciding application</heading><subclause affected.by.uncommenced="0" guid="_0284f980-f3d9-40a8-b0ec-d4805d35e101" id="sec.72N-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must decide either to grant or refuse a bad debt credit application within 30 days after the later of the following days—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ef009846-26fa-4f1c-b611-22e3eb907f51" id="sec.72N-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the day the chief executive receives the application;</txt></block></li><li guid="_90bf3987-30cb-4d9f-92d1-c5b99e1e81a2" id="sec.72N-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if additional information or documents are requested under <intref check="valid" refid="sec.72M" target.guid="_780591fe-c2bf-487f-a63a-a97892e745bb">section 72M</intref>—the day the chief executive receives the information or documents.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c1ce2971-25c1-49f1-b280-0341dc12ae21" id="sec.72N-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In deciding whether to grant or refuse the application, the chief executive must consider the information included in the application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b50fdbb3-7e61-422c-917b-5b2efd5644c0" id="sec.72N-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_38232077-d21e-4ca4-a304-07264633dd5f" id="sec.72N-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">grant a bad debt credit application if the applicant is eligible for the credit; or</txt></block></li><li guid="_f89b3668-abed-4580-82db-3c65a325f0cb" id="sec.72N-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">refuse a bad debt credit application if the applicant is not eligible for the credit.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3a8acf1d-f4d0-464f-8a76-7c6548e171fa" id="sec.72N-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A failure to make a decision within the period required is taken to be a decision by the chief executive to refuse the application.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_43259dd2-656a-4128-b6ce-296c1bbb49af" id="sec.72O" provision.type="other" spent.amends="0"><no>72O</no><heading guid="_cbe439e7-b990-4b18-b0c4-8604954ee77e" id="sec.72O-he">Grant of application</heading><subclause affected.by.uncommenced="0" guid="_8ab2d00a-a4b8-4627-9fdd-282a7c1f2305" id="sec.72O-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the chief executive decides to grant a bad debt credit application, the chief executive must, within 5 business days after granting the application, give the applicant a notice stating—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a6b25fec-2ddd-4194-8a3e-a442e85584ca" id="sec.72O-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the application has been granted; and</txt></block></li><li guid="_9bb835ad-4def-44d8-8229-2a92d1967fad" id="sec.72O-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the amount of the bad debt credit.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_aa0013b3-ca1c-416f-b84a-fee99b5a28b6" id="sec.72O-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must also include or be accompanied by an information notice for the decision in relation to the amount of the bad debt credit.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_dafa9ffb-9102-4266-9426-471c8b0860ab" id="sec.72P" provision.type="other" spent.amends="0"><no>72P</no><heading guid="_f3a7ce79-d79e-4ac8-9418-25998bc88c57" id="sec.72P-he">Refusal of application</heading><block><txt break.before="1">If the chief executive decides to refuse a bad debt credit application, the chief executive must, within 5 business days after refusing the application, give the applicant an information notice for the decision.</txt></block></clause><clause affected.by.uncommenced="0" guid="_418178c6-8583-4ac0-8aad-3b8bd33e1a08" id="sec.72Q" provision.type="other" spent.amends="0"><no>72Q</no><heading guid="_46d9ccd3-bb73-4286-b8fc-95bd8950ec83" id="sec.72Q-he">Payment of bad debt credit</heading><subclause affected.by.uncommenced="0" guid="_f9bcc8a4-deb2-47a5-bd1d-9a7604db2a14" id="sec.72Q-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the chief executive decides to grant a bad debt credit application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_847b182e-f560-4c4a-8677-6e727a9da4a4" id="sec.72Q-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive must deduct the amount of the bad debt credit from the waste levy amount the applicant is required to remit to the State under <intref check="valid" refid="sec.56" target.guid="_56f0993b-32fe-42f6-9d56-3991b3827be2">section 56</intref> for the relevant levy period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_589cd3c1-f4fb-4e70-b2ab-597723472890" id="sec.72Q-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, if the total amount of the bad debt credit is more than the amount the applicant is required to remit to the State, the chief executive must pay the applicant an amount equal to the excess.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_004f18a1-fac7-454e-a58e-6e2fc417afa6" id="sec.72Q-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the applicant is no longer the operator of a waste disposal site, the chief executive must pay the applicant an amount equal to the bad debt credit.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_028a09d5-7be8-4373-8175-d8d6c232032c" id="sec.72Q-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_f91b3aec-30c0-460f-a872-a69ff2726491" id="sec.72Q-ssec.5-def.relevantlevyperiod_"><txt break.before="1"><defterm guid="_7bfdc9db-a18f-4625-8e69-ebf4a2d1a207" id="sec.72Q-ssec.5-def.relevantlevyperiod" type="definition">relevant levy period</defterm>, for an application, means the levy period at the time the application is decided.</txt></definition></deflist></block></subclause></clause></subdivision></division></part><part affected.by.uncommenced="0" guid="_f55feae3-09d8-4178-8997-08090c3cc889" id="ch.3-pt.6"><no>Part 6</no><heading guid="_88c2ceda-dfae-4e95-be9a-c9957f6a1cac" id="ch.3-pt.6-he">Resource recovery area</heading><division affected.by.uncommenced="0" guid="_fc0199bd-19b9-4a88-9d00-1c01695e14df" id="ch.3-pt.6-div.1"><no>Division 1</no><heading guid="_80c55fb7-5ec2-4452-881f-c85fe5182d2c" id="ch.3-pt.6-div.1-he">Declaration of resource recovery area</heading><clause affected.by.uncommenced="0" guid="_0acf4c39-5f4f-418c-b8a1-2abd8f6db492" id="sec.72R" provision.type="other" spent.amends="0"><no>72R</no><heading guid="_bf693643-0d0d-4df8-8b9a-61828d1fe2ca" id="sec.72R-he">Resource recovery area</heading><block><txt break.before="1">The operator of a waste disposal site may declare an area within the site as a <defterm guid="_a91c3286-82ad-496f-8dde-8637c50f67fc" id="def.resourcerecoveryarea" type="definition">resource recovery area</defterm> if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3f3ddae2-eb36-4582-ab63-26cac3b23143" id="sec.72R-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a recycling activity is conducted in the area; and</txt></block></li><li guid="_05ff6bbf-0008-4e77-bff4-c238acedad51" id="sec.72R-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the operator, or another entity that is responsible for the operation of the area, holds all licences, environmental authorities or other approvals required for conducting the recycling activity in the area; and</txt></block></li><li guid="_d098c3a6-3eee-42b6-b9fb-8ad9496347ae" id="sec.72R-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a physical barrier—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d4a05dcf-ba9f-4204-81cc-ce3ba5664eaf" id="sec.72R-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">separates the area from the rest of the site; and</txt></block></li><li guid="_d8bd36f9-7041-41f9-befc-936ba5ea1048" id="sec.72R-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">prevents vehicles from moving between the area and the rest of the site other than through points of access shown on the plan of the site accompanying a notice under <intref check="valid" refid="sec.72S" target.guid="_6778427e-dcd3-4737-aaf0-4b647608e68c">section 72S</intref> or <intref check="valid" refid="sec.72U" target.guid="_867aa1df-1ce5-47ea-b544-661c75931fa3">72U</intref>; and</txt></block></li></list></block></li><li guid="_8d238cf4-4e6c-451f-9744-6199c5a4a500" id="sec.72R-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the area and the physical barrier comply with the requirements prescribed by regulation for the area and barrier; and</txt></block></li><li guid="_3e4a4beb-611a-4d43-97a5-1be52f51b06a" id="sec.72R-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">there has not, within the last year, been a revocation of a declaration of a resource recovery area at the site.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_6778427e-dcd3-4737-aaf0-4b647608e68c" id="sec.72S" provision.type="other" spent.amends="0"><no>72S</no><heading guid="_fc875537-8307-4ff7-b0d6-4f6afade658b" id="sec.72S-he">Declaration of resource recovery area</heading><subclause affected.by.uncommenced="0" guid="_863887d9-729b-4ff7-904c-969718c4ac81" id="sec.72S-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a waste disposal site declares a resource recovery area by giving the chief executive notice of a proposed resource recovery area at least 20 days before using the area as a resource recovery area.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6ea2959b-4867-4a8f-b80c-11c719046ca9" id="sec.72S-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5e3b42dd-3dcf-47a6-8fda-2d4cbb60cba1" id="sec.72S-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li guid="_afef3508-0c7b-45d9-a33e-e20dce5a4bf4" id="sec.72S-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state the day the declaration takes effect; and</txt></block></li><li guid="_2a082afa-2ed2-44e6-86d3-b6136b86dc47" id="sec.72S-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">include a description of the activities to be carried out in the resource recovery area; and</txt></block></li><li guid="_ad93b0eb-3ec5-4acd-b335-1e5fe5a6be35" id="sec.72S-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">be accompanied by a plan of the waste disposal site indicating the resource recovery area and clearly showing—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_141358eb-53b7-4821-af4a-076457553b43" id="sec.72S-ssec.2-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the physical barrier between the area and the rest of the site; and</txt></block></li><li guid="_7d383326-6abd-4883-bfeb-28a98f1b0f14" id="sec.72S-ssec.2-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the points of access allowing vehicles to move between the area and the rest of the site; and</txt></block></li></list></block></li><li guid="_1a8c1ce6-74cb-4132-8b24-728e9a052716" id="sec.72S-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">be signed by the operator and any other entity that will be responsible for the area.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2ddf17ad-e28e-4949-b302-f61ef98a4ec1" id="sec.72T" provision.type="other" spent.amends="0"><no>72T</no><heading guid="_3df48b4f-422c-46a8-b27b-f7457190d090" id="sec.72T-he">Effect of declaration of resource recovery area</heading><block><txt break.before="1">If the requirements under this division for the declaration or amendment of a resource recovery area have been complied with, and the declaration has not been cancelled or revoked—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fba849b2-f1eb-4501-a187-0dcffa4586ef" id="sec.72T-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the resource recovery area is not part of the levyable waste disposal site whose operator made the declaration; and</txt></block></li><li guid="_c304a2c0-9d31-4983-8b70-206f452d2ce2" id="sec.72T-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">all waste that is moved from the resource recovery area to the levyable waste disposal site is, for the purposes of the waste levy, taken to be waste delivered to the levyable waste disposal site.</txt><note guid="_ed083211-2d39-4c60-abe9-e35db0b8e61d" id="sec.72T-para1.b-note" type="example"><heading guid="_39d3ea24-ddde-42a6-a617-4ea959b4daee" id="sec.72T-para1.b-note-he">Note—</heading><block><txt break.before="1">If levyable waste is delivered to a levyable waste disposal site, the waste levy on the waste may be payable under <intref check="valid" refid="sec.36" target.guid="_626aee8b-abb7-485d-9bb6-2be57d974507">section 36</intref>.</txt></block></note></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_867aa1df-1ce5-47ea-b544-661c75931fa3" id="sec.72U" provision.type="other" spent.amends="0"><no>72U</no><heading guid="_c1a712aa-b5b8-46c4-b5e4-4d62ac8d85ba" id="sec.72U-he">Amendment of resource recovery area<ins xml:space="preserve"> by operator</ins></heading><subclause affected.by.uncommenced="0" guid="_08379842-a892-4520-9b07-a0ff4f9da04b" id="sec.72U-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a waste disposal site for which a resource recovery area has been declared may amend the area’s declaration as a resource recovery area by giving the chief executive notice of the proposed amendment at least 20 days before the amendment is to take effect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_36644f4c-764d-4918-9213-3dbe010ba516" id="sec.72U-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_37bd32ce-d019-47f2-95da-b18533496ee3" id="sec.72U-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li guid="_7164e083-77e4-46fd-aeb6-352ed8c5981b" id="sec.72U-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state the day the amendment takes effect; and</txt></block></li><li guid="_a4d5c6b4-ff33-448f-8652-affe8e8823ea" id="sec.72U-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the recycling activities to be conducted in the amended resource recovery area differ from the activities currently carried out in the area—include a description of the recycling activities to be conducted in the amended resource recovery area; and</txt></block></li><li guid="_2364577a-b4cf-4324-a5cb-5b3f161e70dc" id="sec.72U-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">be accompanied by a plan of the waste disposal site indicating the amended resource recovery area and clearly showing—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e995bd3e-1699-4e8e-9001-006c5820f78d" id="sec.72U-ssec.2-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the physical barrier between the area and the rest of the site; and</txt></block></li><li guid="_85b7d845-b1ba-4cfe-b566-480bab729d9d" id="sec.72U-ssec.2-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the points of access allowing vehicles to move between the area and the rest of the site; and</txt></block></li></list></block></li><li guid="_c0640f6a-fb05-4f5c-8841-698bbc6ea419" id="sec.72U-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">be signed by the operator and any other entity that will be responsible for the area.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_39d9f5a1-1c5a-49f0-8354-e782e0716c85" id="sec.72U-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The operator need not act under <legref check="invalid" jurisd="QLD" refid="sec.72U-ssec.1" type="act">subsection (1)</legref> if the only change to the resource recovery area is a change to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_88c97be9-e820-4f63-9f19-7576f5030f78" id="sec.72U-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the recycling activities conducted in the area; or</txt></block></li><li guid="_d396a9b3-3bd4-40b3-ac5e-a7df05854826" id="sec.72U-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the physical barrier or points of access for the area that do not change the boundaries of the area; or</txt></block></li><li guid="_08912882-62a2-4797-994b-8f1922444681" id="sec.72U-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the entity having responsibility for the operation of the area.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_eec3f2f8-a99b-4c18-9bdb-92ca7db98de7" id="sec.72U-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If an amendment of a resource recovery area under this section results in a part of the area being within the levyable waste disposal site—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_57295548-6c24-4d70-b1fe-9c5d8cf5d217" id="sec.72U-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that part of the area becomes part of the site; and</txt></block></li><li guid="_c374d0ef-323c-4e2c-bb05-79d49193387f" id="sec.72U-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">all waste within that part of the area is, for the purposes of the waste levy, taken to be waste delivered to the site.</txt><note guid="_a8e0b06d-a905-44f5-afdf-8f5535301cc5" id="sec.72U-ssec.4-para1.b-note" type="example"><heading guid="_e35e9d28-c429-4371-b2f7-8e05dfe1a9fb" id="sec.72U-ssec.4-para1.b-note-he">Note—</heading><block><txt break.before="1">If levyable waste is delivered to a levyable waste disposal site, the waste levy on the waste may be payable under <intref check="valid" refid="sec.36" target.guid="_626aee8b-abb7-485d-9bb6-2be57d974507">section 36</intref>.</txt></block></note></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d64fbfc5-62ea-400d-94eb-52491f105082" id="sec.72V" provision.type="other" spent.amends="0"><no>72V</no><heading guid="_0b35f9d2-8d6c-4618-985c-f2381d531332" id="sec.72V-he">Cancellation of resource recovery area<ins xml:space="preserve"> by operator</ins></heading><subclause affected.by.uncommenced="0" guid="_189f517c-6d3a-4c05-be80-6e6416591b65" id="sec.72V-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a waste disposal site for which a resource recovery area has been declared may cancel the area’s declaration as a resource recovery area by giving the chief executive notice of the proposed cancellation at least 30 days before the cancellation is to take effect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_da921d3f-2a11-41c9-abb1-bae5520dab6d" id="sec.72V-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must state the day the cancellation takes effect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_849582c0-a9a9-44ab-a8b5-24a6bf9dd19f" id="sec.72V-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If a resource recovery area is cancelled under this section—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_26647ce6-a3f8-4cbc-8276-7387ad41ba2a" id="sec.72V-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the cancelled area becomes part of the levyable waste disposal site; and</txt></block></li><li guid="_e0f07669-91c8-4ae6-8cd6-01abd4e3e30b" id="sec.72V-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">all waste within the cancelled area is, for the purposes of the waste levy, taken to be waste delivered to the levyable waste disposal site.</txt><note guid="_d226268c-fb60-4951-ac35-b6a288b8f7e6" id="sec.72V-ssec.3-para1.b-note" type="example"><heading guid="_ede63079-4ee2-43b5-a607-bbdb2a028943" id="sec.72V-ssec.3-para1.b-note-he">Note—</heading><block><txt break.before="1">If levyable waste is delivered to a levyable waste disposal site, the waste levy on the waste may be payable under <intref check="valid" refid="sec.36" target.guid="_626aee8b-abb7-485d-9bb6-2be57d974507">section 36</intref>.</txt></block></note></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_8270d5e0-0648-456d-8454-26642abe45a7" id="sec.72VA" provision.type="other" spent.amends="0"><no>72VA </no><heading guid="_8086d513-5702-49d3-a123-6337ff6b8263" id="sec.72VA-he">Amendment or suspension of resource recovery area by chief executive</heading><subclause affected.by.uncommenced="0" guid="_c39f39d0-dc7d-4f62-b7d0-a93609d284da" id="sec.72VA-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may amend or suspend the declaration of a resource recovery area by the operator of a waste disposal site if the chief executive is satisfied that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_339d7b93-a832-45ea-b2a5-8c1197f53072" id="sec.72VA-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">1 or more of the matters mentioned in section 72R(a) to (e) do not, or no longer, apply in relation to the resource recovery area; or</txt></block></li><li guid="_3030aa03-a544-44df-b092-7444882a8193" id="sec.72VA-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">conducting a recycling activity in the resource recovery area would prejudice the investigation of the commission, or possible commission, of an offence against a provision of division 2.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_011b9843-5c49-4872-833f-0ef224924c25" id="sec.72VA-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the chief executive proposes to amend or suspend the declaration of the resource recovery area (the <defterm guid="_4fc4989a-ebe3-4e58-9bb9-84c4b0f13279" id="sec.72VA-def.proposedaction" type="definition">proposed action</defterm>), the chief executive must first give the operator a notice (a <defterm guid="_6ee7194c-c24a-4c47-8cf4-e6cfdade0825" id="sec.72VA-def.showcausenotice" type="definition">show cause notice</defterm>) about the proposed action.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_456d1154-ea0e-4398-9fe9-9790d544df64" id="sec.72VA-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The show cause notice must state each of the following matters—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_857022a0-e8c7-4c2d-81ec-e23c7c58c639" id="sec.72VA-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the proposed action;</txt></block></li><li guid="_aa5b3f51-7410-4464-8434-2028194a804e" id="sec.72VA-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the proposed action is an amendment—the proposed amendment;</txt></block></li><li guid="_cb96dba0-ee82-4cd6-9275-71af55275c33" id="sec.72VA-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the proposed action is suspension—the period of the proposed suspension;</txt></block></li><li guid="_b98f2536-c0fa-4cc8-a355-3015f6b6cbea" id="sec.72VA-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the reasons for the proposed action;</txt></block></li><li guid="_cda85e20-03ed-4937-bde7-93dbf5705ed0" id="sec.72VA-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">that the operator may, within a stated period (the <defterm guid="_712d6e4b-d12f-4aa6-8587-6b7f7c494969" id="sec.72VA-ssec.3-def.showcauseperiod" type="definition">show cause period</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ff4eeb53-f49e-4be1-99f3-71f7f0380146" id="sec.72VA-ssec.3-para1.e-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">make a written submission to the chief executive about why the proposed action should not be taken; or</txt></block></li><li guid="_0501987a-4163-4d20-8bf5-ce679e70a719" id="sec.72VA-ssec.3-para1.e-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">take stated actions, if any, to avoid the taking of the proposed action.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_47ef15c0-6f74-4572-b83b-c76b86b6383f" id="sec.72VA-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The show cause period must not end earlier than 21 days after the operator is given the show cause notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7abb0cb8-6a48-4ddb-90d2-6493dded0006" id="sec.72VA-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Within 20 business days after the end of the show cause period, the chief executive must decide whether or not to take the proposed action having regard to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_110e325e-1941-4053-a208-73f83e5d9f8a" id="sec.72VA-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">any written submissions made by the operator during the show cause period; and</txt></block></li><li guid="_1c8558bf-eb9a-47ed-ba4a-6fa127da3e8d" id="sec.72VA-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the extent to which the operator has taken any actions mentioned in subsection (3)(e)(ii).</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e4bfc69a-33a7-4eae-a17a-ed23ff49426e" id="sec.72VA-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The chief executive may decide to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7456b247-4f67-477e-9a78-c570e3669f43" id="sec.72VA-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the proposed action was to make a stated amendment—make the stated amendment; or</txt></block></li><li guid="_7100abe2-a8fc-4d4a-91e4-cb33bf958325" id="sec.72VA-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the proposed action was to suspend the declaration for a stated period—suspend the declaration for no longer than the stated period.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_bf1f2ceb-72b2-4c5e-a0c4-122e9e2c86cd" id="sec.72VA-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">The chief executive must, within 10 business days after making the decision, give the operator—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_177574ee-4d20-4685-bc19-d965eff5e263" id="sec.72VA-ssec.7-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the chief executive decides to take the proposed action—an information notice for the decision; or</txt></block></li><li guid="_488b5126-ca1f-4e13-b552-d3382def5954" id="sec.72VA-ssec.7-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the chief executive decides not to take the proposed action—a notice about the decision.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c3733b1a-3ec3-43f5-9969-8e7d073ca477" id="sec.72VA-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">A decision to take the proposed action takes effect on the later of the following days—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8e323a66-4982-43ee-af06-9eef7e2a8f1f" id="sec.72VA-ssec.8-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the day the information notice is given to the operator;</txt></block></li><li guid="_6aa576ea-7742-4e7d-8f6c-96b62044c7c3" id="sec.72VA-ssec.8-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the information notice states a day on which the proposed action takes effect—the stated day.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_bc1bc412-504a-48f6-b857-689576ba9c42" id="sec.72VA-ssec.9" provision.type="other"><no>(9)</no><block><txt break.before="0">If the declaration of the resource recovery area is suspended under this section, then, for the period of the suspension—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_75a93ab8-1456-4727-817d-662fca338e81" id="sec.72VA-ssec.9-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the area is taken to be part of the levyable waste disposal site; and</txt></block></li><li guid="_fd4ea572-30b4-40f7-b10e-8405578d754d" id="sec.72VA-ssec.9-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">all waste, other than exempt waste, delivered to the area during the period is, for the purposes of the waste levy, taken to be waste delivered to the levyable waste disposal site.</txt><note guid="_bcacd1c5-954a-4e5e-8e1c-4cd3f77ad757" id="sec.72VA-ssec.9-para1.b-note" type="example"><heading guid="_055fee74-8814-4bf1-ad02-3100bcfd1732" id="sec.72VA-ssec.9-para1.b-note-he">Note—</heading><block><txt break.before="1">If levyable waste is delivered to a levyable waste disposal site, the waste levy on the waste may be payable under section 36.</txt></block></note></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a7ddcc38-e4dc-43b9-8d41-ceb038bafc9b" id="sec.72W" provision.type="other" spent.amends="0"><no>72W </no><heading guid="_9bbf28bc-0dea-47c6-9d9f-8827cef66988" id="sec.72W-he">Revocation of resource recovery area by chief executive</heading><subclause affected.by.uncommenced="0" guid="_8dc549e7-9514-40bd-98ac-6c8e3dc1eaeb" id="sec.72W-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may revoke a declaration by the operator of a waste disposal site of an area as a resource recovery area if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_edc24f4c-75b3-4594-8724-6744f6f2a660" id="sec.72W-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">there is an active landfill cell within the area; or</txt></block></li><li guid="_82f11cb0-04a2-442f-af19-83aad28e575a" id="sec.72W-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the amount of waste, including recyclable waste, stockpiled in the area is greater than the total amount of waste delivered to the area in the previous 12 months; or</txt></block></li><li guid="_9c432865-a612-4ff0-8e0e-94abe25959f8" id="sec.72W-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the operator or another entity having responsibility for the operation of the resource recovery area is convicted of an offence under this part; or</txt></block></li><li guid="_69b90c6e-a5ff-4fb0-9d22-a55a42e48d55" id="sec.72W-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the chief executive is satisfied the area does not fulfil, or no longer fulfils, the requirements under <intref check="valid" refid="sec.72R" target.guid="_0acf4c39-5f4f-418c-b8a1-2abd8f6db492">section 72R</intref> for an area to be declared as a resource recovery area.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1658d6da-da54-4995-9e7d-cd42ab9c8edd" id="sec.72W-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Before revoking the declaration (the <defterm guid="_7912da3d-fae8-42ce-9c48-7f09c59496d6" id="sec.72W-def.proposedaction" type="definition">proposed action</defterm>), the chief executive must give notice to the operator of the waste disposal site stating all of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ca723624-3ee4-4cc5-8048-70d37dea100d" id="sec.72W-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the proposed action;</txt></block></li><li guid="_4cf42dcc-2cc6-4e1d-9a0c-a07e787734e5" id="sec.72W-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the grounds for taking the proposed action;</txt></block></li><li guid="_3c41ada7-d4d6-485a-b6c6-819428da3df4" id="sec.72W-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the facts and circumstances that form the basis for the grounds;</txt></block></li><li guid="_66b99293-51c2-4d6a-bf29-940db0de1e5d" id="sec.72W-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">when the proposed action is intended to take effect;</txt></block></li><li guid="_7dedec1b-2c3c-4cbc-9214-f71e4b6de752" id="sec.72W-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">that the operator may make, within a stated period, written submissions to show why the proposed action should not be taken.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_73839684-893d-4223-b797-96989dad1e00" id="sec.72W-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The stated period for submissions must not end earlier than 21 days after the operator of the waste disposal site is given the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_cff452ad-820f-4316-a22f-e19d33e7502d" id="sec.72W-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive must consider all submissions made under <intref check="valid" refid="sec.72W-ssec.2" target.guid="_1658d6da-da54-4995-9e7d-cd42ab9c8edd">subsection (2)</intref><intref check="valid" refid="sec.72W-ssec.2-para1.e" target.guid="_7dedec1b-2c3c-4cbc-9214-f71e4b6de752">(e)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_89a016ba-3b88-4a7f-bbaa-ede79cb36c36" id="sec.72W-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the chief executive decides to take the proposed action, the chief executive must, within 10 business days after making the decision, give the operator of the waste disposal site an information notice for the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_09542859-8319-49b6-a526-2000346002af" id="sec.72W-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The decision takes effect when the information notice is given.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ab4077b0-24f0-4564-9dcc-9cdf275ea841" id="sec.72W-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">If a resource recovery area is revoked under this section—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c138179a-4295-4b29-bbce-8c4d1927dcb2" id="sec.72W-ssec.7-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the area becomes part of the levyable waste disposal site; and</txt></block></li><li guid="_2f8fd10e-5216-4773-9b22-35fdd878ac54" id="sec.72W-ssec.7-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">all waste within the area is, for the purposes of the waste levy, taken to be waste delivered to the levyable waste disposal site.</txt><note guid="_2d3e7324-c2d1-4513-9bfc-052d068121f0" id="sec.72W-ssec.7-para1.b-note" type="example"><heading guid="_48716b3b-d1db-496e-bd79-d90244b01585" id="sec.72W-ssec.7-para1.b-note-he">Note—</heading><block><txt break.before="1">If levyable waste is delivered to a levyable waste disposal site, the waste levy on the waste may be payable under <intref check="valid" refid="sec.36" target.guid="_626aee8b-abb7-485d-9bb6-2be57d974507">section 36</intref>.</txt></block></note></block></li></list></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_86e15819-f381-440c-8afc-aba141fec9ce" id="ch.3-pt.6-div.2"><no>Division 2 </no><heading guid="_fbdc3268-35dd-4b89-8b70-7f1dcfa49b87" id="ch.3-pt.6-div.2-he">Obligations relating to resource recovery area</heading><clause affected.by.uncommenced="0" guid="_2f977b6e-f533-45f7-a7e3-a5d9b1bc5b14" id="sec.72X" provision.type="other" spent.amends="0"><no>72X</no><heading guid="_62136f35-1f2a-441e-a035-273b32284592" id="sec.72X-he">Requirement to keep documents</heading><block><txt break.before="1">An entity having responsibility for the operation of a resource recovery area must keep the following documents for at least 5 years after the event that is the subject of the document happens—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0ad2aab4-ed37-4d1d-8ca1-f3312b4dc3e6" id="sec.72X-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">any document that records waste delivered to the area, including its measurements;</txt></block></li><li guid="_e40b5b8d-2ee3-4d98-a156-f6967e5444f9" id="sec.72X-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any document that records waste or other material removed from the area as mentioned in <intref check="valid" refid="sec.59" target.guid="_753c71b4-2d8f-457c-9d00-64ab00810913">section 59</intref><intref check="invalid" refid="sec.59-para1.d">(d)</intref>, including its measurements;</txt></block></li><li guid="_267353a7-6085-4c87-87f7-23256fa995ea" id="sec.72X-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a copy of the results of a volumetric survey of the area carried out under <intref check="valid" refid="sec.72Y" target.guid="_c86b8c3f-a9f0-499e-8a55-07c0716cc048">section 72Y</intref> or <intref check="valid" refid="sec.72Z" target.guid="_7afd9761-9b3c-4b65-b873-e42fd9374ab0">72Z</intref>;</txt></block></li><li guid="_bd5e91c3-3e45-4554-87b5-2acd4da17216" id="sec.72X-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">any document that records any other event for the area as prescribed by regulation.</txt></block></li></list><penalty guid="_074a321a-42b5-41f6-8b3a-93f90843066d" id="sec.72X-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></block></clause><clause affected.by.uncommenced="0" guid="_c86b8c3f-a9f0-499e-8a55-07c0716cc048" id="sec.72Y" provision.type="other" spent.amends="0"><no>72Y</no><heading guid="_353eee33-9f4d-40ef-988d-e0eb8571a1a1" id="sec.72Y-he">Volumetric survey for resource recovery area in waste levy zone</heading><subclause affected.by.uncommenced="0" guid="_0e8122e6-75fc-4507-af81-b3ac83f9e1dc" id="sec.72Y-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">From 1 June 2020, this section applies for a resource recovery area for a waste disposal site in the waste levy zone.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_534deb3c-cfea-418e-b7e6-b7d0c4a8016b" id="sec.72Y-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The entity having responsibility for the operation of the resource recovery area must, in each year—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bff2fec2-0735-456d-9047-6c71b63abad2" id="sec.72Y-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">ensure that a volumetric survey is carried out in June for all stockpiled waste at the resource recovery area; and</txt></block></li><li guid="_e153b01c-44fa-44b1-bc70-44296c565c02" id="sec.72Y-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give the chief executive a copy of the results of the volumetric survey in the approved form before the end of July.</txt></block></li></list></block><penalty guid="_9a292884-e720-4d14-8501-e7dbfb63f098" id="sec.72Y-ssec.2-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_34563841-80ac-461b-9ce9-23c22ce74827" id="sec.72Y-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The volumetric survey must be carried out in compliance with the requirements prescribed by regulation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e169b048-eabc-4971-92c0-f508a34f2f52" id="sec.72Y-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The results of the volumetric survey must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_01de950e-db0e-4dd4-8f79-8b3ed0bfc258" id="sec.72Y-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in electronic form; and</txt></block></li><li guid="_648fd812-f41b-42e1-802b-7ac18924386e" id="sec.72Y-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">include a topographical plan complying with the specifications advised by the chief executive; and</txt></block></li><li guid="_9525c794-04b5-4b92-9eb8-d4313254f006" id="sec.72Y-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">include details of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1b8e20dc-b95d-4a99-bac2-e7d156d91c13" id="sec.72Y-ssec.4-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the area of the resource recovery area;</txt></block></li><li guid="_c3d18311-838c-400f-8363-782008a98f2c" id="sec.72Y-ssec.4-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the stockpiles of waste, including recyclable waste, at the area; and</txt></block></li></list></block></li><li guid="_c0f14888-6677-4ce5-9406-1136a327b51c" id="sec.72Y-ssec.4-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">be certified as accurate by a surveyor under the <legref check="valid" jurisd="QLD" target.doc.id="act-2003-070" target.version.series="58bf4472-9a2d-4809-9f04-c4ff625373da" type="act"><name emphasis="yes">Surveyors Act 2003</name></legref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f25c2278-3437-42a2-ad11-38e44c07b42e" id="sec.72Y-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">This section continues to apply to the entity having responsibility for the operation of the resource recovery area even if the declaration of the area as a resource recovery area is cancelled or revoked.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_76eec432-a5ae-4639-afe6-c34cc95323be" id="sec.72Y-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">However, if a matter mentioned in <intref check="valid" refid="sec.72Y-ssec.5" target.guid="_f25c2278-3437-42a2-ad11-38e44c07b42e">subsection (5)</intref> happens, the carrying out of the survey and the giving of a copy of the results to the chief executive may happen earlier than when otherwise required under <intref check="valid" refid="sec.72Y-ssec.2" target.guid="_534deb3c-cfea-418e-b7e6-b7d0c4a8016b">subsection (2)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_865c3ef8-4198-4c4c-927c-2bc48dd5f433" id="sec.72Y-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">This section does not apply to a resource recovery area for a small site until 1 June 2022.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7afd9761-9b3c-4b65-b873-e42fd9374ab0" id="sec.72Z" provision.type="other" spent.amends="0"><no>72Z</no><heading guid="_eb3f8975-7faa-435e-a128-a90a832954d9" id="sec.72Z-he">Volumetric survey for resource recovery area in non-levy zone</heading><subclause affected.by.uncommenced="0" guid="_12a75d0e-9e08-4a27-96d6-f26109e8c65d" id="sec.72Z-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies for a resource recovery area declared for a waste disposal site if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5b079ace-b99a-4ed0-93b6-ad73bcd7ba0d" id="sec.72Z-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the site is in the non-levy zone; and</txt></block></li><li guid="_a9ec14cc-39e6-4cca-9a1c-a305b58ec3cf" id="sec.72Z-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">either—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6716af07-0b9a-4f11-8197-204ee93b471c" id="sec.72Z-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">from 1 July 2019 to 31 December 2019—at least 300 tonnes of levyable waste, generated outside the non-levy zone, is received at the resource recovery area; or</txt></block></li><li guid="_39332896-0070-44b3-9538-d5c178a8d9e3" id="sec.72Z-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">from 1 January 2020—at least 600 tonnes of levyable waste, generated outside the non-levy zone, is received at the resource recovery area during a year.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ad6014bb-a0f8-48b1-bd11-0e4d5e38e880" id="sec.72Z-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The entity having responsibility for the operation of the resource recovery area must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f6fb82d7-d2e8-4611-883d-79507814520e" id="sec.72Z-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before the end of June of the following year, ensure a volumetric survey is carried out for all stockpiled waste at the resource recovery area; and</txt></block></li><li guid="_00a6603e-f9fd-4bc7-890b-31c5dcb5c7ad" id="sec.72Z-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">before the end of July in the following year, give the chief executive a copy of the results of the survey in the approved form.</txt></block></li></list></block><penalty guid="_ed29867b-2773-437b-9a5b-0d18a355a4f2" id="sec.72Z-ssec.2-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_26a98f00-b2cc-479d-bfcb-a0c866558d66" id="sec.72Z-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The volumetric survey must be carried out in compliance with the requirements prescribed by regulation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7f458b26-7113-4860-9fbf-ed3121b88aa8" id="sec.72Z-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The results of the volumetric survey must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4d4a2eb6-9558-41ff-8198-1918bb435f8e" id="sec.72Z-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in electronic form; and</txt></block></li><li guid="_0490642f-baec-4c5b-9c20-0e72f2bec285" id="sec.72Z-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">include a topographical plan complying with specifications advised by the chief executive; and</txt></block></li><li guid="_b77401e2-b04e-4ea1-a637-58e137f50c4a" id="sec.72Z-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">include details of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_99d10ba9-6027-4ec5-8054-273edfe849a2" id="sec.72Z-ssec.4-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the area of the resource recovery area;</txt></block></li><li guid="_5b2a5374-4d32-4477-9fb9-02e580bc72e9" id="sec.72Z-ssec.4-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the stockpiles of waste, including recyclable waste, at the area; and</txt></block></li></list></block></li><li guid="_3ae659c3-7a86-45f4-8d68-b410f44a07c7" id="sec.72Z-ssec.4-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">be certified as accurate by a surveyor under the <legref check="valid" jurisd="QLD" target.doc.id="act-2003-070" target.version.series="58bf4472-9a2d-4809-9f04-c4ff625373da" type="act"><name emphasis="yes">Surveyors Act 2003</name></legref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_810fd0e7-f8d1-412d-8a04-4ea24bae5403" id="sec.72Z-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">This section continues to apply to the entity having responsibility for the operation of the resource recovery area even if the declaration of the area as a resource recovery area is cancelled or revoked.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9b8549d2-a7a6-4d06-8358-58b10195ebfc" id="sec.72Z-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">However, if a matter mentioned in <intref check="valid" refid="sec.72Z-ssec.5" target.guid="_810fd0e7-f8d1-412d-8a04-4ea24bae5403">subsection (5)</intref> happens, the carrying out of the survey and the giving of a copy of the results to the chief executive may happen earlier than when otherwise required under <intref check="valid" refid="sec.72Z-ssec.2" target.guid="_ad6014bb-a0f8-48b1-bd11-0e4d5e38e880">subsection (2)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0d97bbd6-52cc-4893-ac55-81083de0ac96" id="sec.72Z-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">This section does not apply to a resource recovery area declared for a small site until 1 June 2022.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f4277883-46f1-4273-b151-fb96e3130d85" id="sec.73" provision.type="other" spent.amends="0"><no>73</no><heading guid="_4f70d8f9-3d09-4430-afbf-0baf25a1c750" id="sec.73-he">Volumetric survey carried out by chief executive</heading><subclause affected.by.uncommenced="0" guid="_3717fb58-5a0e-4b5e-bb64-fa4785f1016a" id="sec.73-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the entity having responsibility for the operation of a resource recovery area—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_55ac4c63-9fe4-462a-b5c6-d106c7096855" id="sec.73-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is required to carry out a volumetric survey under <intref check="valid" refid="sec.72Y" target.guid="_c86b8c3f-a9f0-499e-8a55-07c0716cc048">section 72Y</intref><intref check="valid" refid="sec.72Y-ssec.2" target.guid="_534deb3c-cfea-418e-b7e6-b7d0c4a8016b">(2)</intref><intref check="valid" refid="sec.72Y-ssec.2-para1.a" target.guid="_bff2fec2-0735-456d-9047-6c71b63abad2">(a)</intref> or <intref check="valid" refid="sec.72Z" target.guid="_7afd9761-9b3c-4b65-b873-e42fd9374ab0">72Z</intref><intref check="valid" refid="sec.72Z-ssec.2" target.guid="_ad6014bb-a0f8-48b1-bd11-0e4d5e38e880">(2)</intref><intref check="valid" refid="sec.72Z-ssec.2-para1.a" target.guid="_f6fb82d7-d2e8-4611-883d-79507814520e">(a)</intref>; but</txt></block></li><li guid="_dda25035-6b03-461e-afc0-9453b42dd02a" id="sec.73-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">fails to carry out the volumetric survey in compliance with the requirements prescribed by regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1bb8d7cf-c606-44bb-be4c-1144bf7ad9c4" id="sec.73-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may arrange for the volumetric survey to be carried out at the resource recovery area and for that purpose may direct an authorised person to enter the area to facilitate the carrying out of the survey.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_820d9729-dd76-4aca-8e2e-d23b5e02be36" id="sec.73-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive may recover the cost of carrying out the volumetric survey from the entity as a debt payable by the entity to the State.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2f0595c2-9cf6-40db-ae33-ed59d3b55428" id="sec.73A" provision.type="other" spent.amends="0"><no>73A</no><heading guid="_b5a00a6e-24c2-41de-b9fc-3c710f108610" id="sec.73A-he">Obligations of entity responsible for operation of resource recovery area</heading><subclause affected.by.uncommenced="0" guid="_e262d0ea-0f85-44bc-ad67-72a2960f94d4" id="sec.73A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the operator of a waste disposal site has declared, or claims to have declared, an area as a resource recovery area under <intref check="valid" refid="sec.72S" target.guid="_6778427e-dcd3-4737-aaf0-4b647608e68c">section 72S</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0b6d7fc5-2edc-4b80-a947-0107f1b0fccc" id="sec.73A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The entity having responsibility for the operation of the resource recovery area must ensure—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a71f6cd2-1593-4270-b2a0-2b6add1ed4b1" id="sec.73A-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">there is not an active landfill cell within the area; and</txt></block></li><li guid="_b04e63b8-b81f-4b66-92f9-5b81fd17ab99" id="sec.73A-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the area complies with the requirements for the area prescribed by regulation; and</txt></block></li><li guid="_927f1d0f-948a-43d8-a689-6e35a3f40af2" id="sec.73A-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the physical barrier between the resource recovery area and the rest of the waste disposal site complies with the requirements prescribed by regulation; and</txt></block></li><li guid="_fdc6c26f-4dbc-4529-be1b-76dfb9095867" id="sec.73A-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the points of access allowing vehicles to move between the area and the rest of the waste disposal site comply with the requirements prescribed by regulation.</txt></block></li></list></block><penalty guid="_2bd8b7c5-891b-4e79-bbfb-952b189ba014" id="sec.73A-ssec.2-pen"><block><txt break.before="1">Maximum penalty—1,665 penalty units.</txt></block></penalty></subclause></clause><clause affected.by.uncommenced="0" guid="_84b492c5-ffa9-44e2-b8b6-ccd99eea203c" id="sec.73B" provision.type="other" spent.amends="0"><no>73B</no><heading guid="_720c6c5f-6f94-4158-ad7f-b13994207620" id="sec.73B-he">False claims about resource recovery area</heading><subclause affected.by.uncommenced="0" guid="_634808a0-6a29-4c2d-a833-b4bbe7f86d2f" id="sec.73B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a waste disposal site must not claim to have a resource recovery area for the site if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_83871a83-a377-480e-9847-e85a5903a8b9" id="sec.73B-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the operator has not declared the area under <intref check="valid" refid="sec.72S" target.guid="_6778427e-dcd3-4737-aaf0-4b647608e68c">section 72S</intref>; or</txt></block></li><li guid="_f2d2f701-ebe5-4165-86f0-f762857a9d36" id="sec.73B-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the declaration of the area has been cancelled or revoked under <intref check="valid" refid="sec.72V" target.guid="_d64fbfc5-62ea-400d-94eb-52491f105082">section 72V</intref> or <intref check="valid" refid="sec.72W" target.guid="_a7ddcc38-e4dc-43b9-8d41-ceb038bafc9b">72W</intref>.</txt></block></li></list><penalty guid="_24383f5b-1e85-458c-bf8a-d1d15c4693ba" id="sec.73B-ssec.1-pen"><block><txt break.before="1">Maximum penalty—1,665 penalty units.</txt></block></penalty></block></subclause><subclause affected.by.uncommenced="0" guid="_07321296-580a-42cb-9c80-4d1d028e2e35" id="sec.73B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The operator of a waste disposal site must not falsely claim a part of the site is within the resource recovery area for the site.</txt><penalty guid="_326a58a4-d662-42b7-9b8c-899fbf696742" id="sec.73B-ssec.2-pen"><block><txt break.before="1">Maximum penalty—1,665 penalty units.</txt></block></penalty></block></subclause></clause><clause affected.by.uncommenced="0" guid="_64eb4733-8ba5-4daf-87b6-a260fd6167fe" id="sec.73C" provision.type="other" spent.amends="0"><no>73C</no><heading guid="_0d45902e-71c0-4a2d-8395-5f51f207eee2" id="sec.73C-he">Changes affecting resource recovery area requiring notification</heading><subclause affected.by.uncommenced="0" guid="_a5555bf4-8ea8-42e3-bcde-45adbe7a5cd8" id="sec.73C-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies for a waste disposal site if a declaration of a resource recovery area is in effect for the site.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_dde6826f-0850-4002-8d21-2850a9693717" id="sec.73C-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If there is a change to the physical barrier or points of access for the resource recovery area that does not change the boundaries of the area, the operator of the waste disposal site must do all of the following within 7 days after the change happens—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_62054cfe-f5c3-4a1f-b598-24e86d9be633" id="sec.73C-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">amend the plan of the waste disposal site;</txt></block></li><li guid="_1844df54-31dd-4d26-8512-f8d6cdf68e5b" id="sec.73C-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give the chief executive notice of the change in the approved form;</txt></block></li><li guid="_616d1e53-d575-49f2-8b8c-27c71c0c9d6a" id="sec.73C-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">give the chief executive a copy of the amended plan of the waste disposal site indicating the resource recovery area and clearly showing the physical barrier and points of access for the area.</txt></block></li></list></block><penalty guid="_c88509bd-8630-423c-932f-6eb43689fb71" id="sec.73C-ssec.2-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_43981d88-6259-4c6f-9ee0-e464d226b254" id="sec.73C-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the recycling activities declared to be conducted in the resource recovery area change, the operator of the waste disposal site must advise the chief executive of the change within 7 days after the change happens.</txt></block><penalty guid="_f7c8460e-3795-4c35-b6b8-4d7664c78d10" id="sec.73C-ssec.3-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_91dc3848-af82-443b-98b9-0f888dca1aa7" id="sec.73C-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If there is a change of the entity having responsibility for the operation of the resource recovery area, the entity having responsibility for the operation of the area immediately before the change must notify the chief executive of the change within 7 days after the change happens.</txt></block><penalty guid="_f8b8fb8d-b3ad-4956-a9cf-f535f2d2b408" id="sec.73C-ssec.4-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_8b622854-5c3f-43a1-8565-ec5b747fd989" id="ch.3-pt.7"><no>Part 7</no><heading guid="_07c3e489-1972-45fe-b307-95ada02f84a2" id="ch.3-pt.7-he"><del xml:space="preserve">Miscellaneous</del><ins xml:space="preserve">Payments to local governments</ins></heading><clause affected.by.uncommenced="0" change="delReplace" guid="_ebaa94df-08ad-46ab-b011-39b062ad922c-del" id="sec.73D-del" provision.type="other" spent.amends="0"><no>73D</no><heading guid="_d6ec7af9-667e-41dc-b797-d1b99c0ec17c-del" id="sec.73D-he-del">Annual payment to local governments</heading><subclause affected.by.uncommenced="0" guid="_d0c6dd16-e9b2-4dc2-80c4-1e6c4a33be41-del" id="sec.73D-ssec.1-del" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must make to each local government affected by the waste levy an annual payment as prescribed by regulation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3810379b-10d2-46a9-835e-48a87884be5c-del" id="sec.73D-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">A local government must use the amount paid to the local government to mitigate any direct impacts of the waste levy on households in the local government’s local government area.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4a1a92f3-aef0-41af-a8a0-59c2bd65bb54-del" id="sec.73D-ssec.3-del" provision.type="other"><no>(3)</no><block><txt break.before="0">If the chief executive reasonably believes a local government has not used the amount paid to the local government as required, the chief executive must not make a further annual payment to the local government until it uses the amount as required.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d1f0db4a-75e9-45ad-b1e2-7c9a26b03e06-del" id="sec.73D-ssec.4-del" provision.type="other"><no>(4)</no><block><txt break.before="0">All rate notices issued by a local government during the year to which the annual payment relates must include a statement that informs the ratepayer of the amount paid to the local government and the purpose of the payment.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e24a2e26-d5fd-45ea-ba31-90eb4403f140-del" id="sec.73D-ssec.5-del" provision.type="other"><no>(5)</no><block><txt break.before="0">If the chief executive reasonably believes a local government has not included the statement in the rate notices as required, the chief executive may refuse to make a further annual payment to the local government until it informs ratepayers of the amount paid and the purpose of the payment.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d273c148-f98d-492a-8e11-d678c1a99ba0-del" id="sec.73D-ssec.6-del" provision.type="other"><no>(6)</no><block><txt break.before="0">If the chief executive reasonably believes a local government has distributed misinformation in relation to an annual payment after receiving the payment, the chief executive may refuse to make a further annual payment to the local government until it informs the intended audience for the distribution how the misinformation is false or misleading.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_271fd97d-6f34-4d11-b8df-c56cce35028c-del" id="sec.73D-ssec.7-del" provision.type="other"><no>(7)</no><block><txt break.before="0">A local government is taken to have distributed misinformation in relation to an annual payment if the local government—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c1faccf5-57db-4e26-aaf8-0837ad525f04-del" id="sec.73D-ssec.7-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">included the misinformation in a rate notice or other document issued by the local government; or</txt></block></li><li guid="_20e890c3-67f7-453f-bf6c-e184ea80bb61-del" id="sec.73D-ssec.7-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">published the misinformation on the local government’s website; or</txt></block></li><li guid="_896d0894-c2e9-4e46-b700-2335ab2b935e-del" id="sec.73D-ssec.7-para1.c-del" provision.type="other"><no>(c)</no><block><txt break.before="0">included the misinformation in an advertisement made by, or on behalf of, the local government.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9675209c-7787-4f3a-ad59-1561f479729d-del" id="sec.73D-ssec.8-del" provision.type="other"><no>(8)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_e12c53db-2229-462e-a4d5-87ebf8d1a699-del" id="sec.73D-ssec.8-def.misinformation_-del"><txt break.before="1"><defterm guid="_b27a3817-1837-48aa-bdfb-3156e7fff88e-del" id="sec.73D-ssec.8-def.misinformation-del" type="definition">misinformation</defterm>, in relation to an annual payment, means a false or misleading statement about—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f24fb032-ba68-45a9-b366-9b362850914f-del" id="sec.73D-ssec.8-def.misinformation-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">the impact of the waste levy on a local government; or</txt></block></li><li guid="_a3bde1a7-ab84-4adc-97fa-f234edc812b8-del" id="sec.73D-ssec.8-def.misinformation-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">the purpose of the annual payment; or</txt></block></li><li guid="_299a4d75-c057-44ea-9a78-22b4aeeba547-del" id="sec.73D-ssec.8-def.misinformation-para1.c-del" provision.type="other"><no>(c)</no><block><txt break.before="0">the amount of the annual payment paid to a local government.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_87c34314-c017-4f35-8f27-5b31e6eb3032-del" id="sec.73D-ssec.8-def.ratenotice_-del"><txt break.before="1"><defterm guid="_0a0bb1d1-5cf7-41e6-89a9-9bab7b15e20a-del" id="sec.73D-ssec.8-def.ratenotice-del" type="definition">rate notice</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5872366d-6b03-4662-b169-6b74a95110a7-del" id="sec.73D-ssec.8-def.ratenotice-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">for the City of Brisbane—see the <legref check="valid" jurisd="QLD" target.doc.id="sl-2012-0235" target.version.series="41e6cc2a-7f19-4b16-947b-f28da505add0" type="subordleg"><name emphasis="yes">City of Brisbane Regulation 2012</name></legref>, <legref check="valid" jurisd="QLD" refid="sch.4" target.doc.id="sl-2012-0235" target.guid="_7aa9c377-157a-456f-a5d6-33a3a12007dc" target.version.series="41e6cc2a-7f19-4b16-947b-f28da505add0" type="subordleg">schedule 4</legref>; or</txt></block></li><li guid="_725466ed-c793-4883-acef-952ee285e53d-del" id="sec.73D-ssec.8-def.ratenotice-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">for any other local government—see the <legref check="valid" jurisd="QLD" target.doc.id="sl-2012-0236" target.version.series="41ff2415-c581-4d17-9646-f6d233ddf461" type="subordleg"><name emphasis="yes">Local Government Regulation 2012</name></legref>, <legref check="valid" jurisd="QLD" refid="sch.8" target.doc.id="sl-2012-0236" target.guid="_6204e2a1-a7d1-4b8f-a9b5-e9bbeb4bcc69" target.version.series="41ff2415-c581-4d17-9646-f6d233ddf461" type="subordleg">schedule 8</legref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_a0388f6f-5446-447a-911d-9473c1061e6e-del" id="sec.73D-ssec.8-def.ratepayer_-del"><txt break.before="1"><defterm guid="_5c5cc217-dc93-404a-8480-0652881bfb8b-del" id="sec.73D-ssec.8-def.ratepayer-del" type="definition">ratepayer</defterm>, for a rate notice, means the entity given the notice.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" change="del" guid="_67992da1-ee56-45ff-af73-077dc9fbdbb7-del" id="sec.73E-del" provision.type="other" spent.amends="0"><no>73E</no><heading guid="_ff2c722e-9564-4e51-8b84-5a7427aa38f1-del" id="sec.73E-he-del">Review of efficacy of waste levy</heading><block><txt break.before="1">The chief executive must review the efficacy of the waste levy—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_424abe2a-5eda-448c-bf8e-19a906afb565-del" id="sec.73E-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">within 3 years after the commencement; and</txt></block></li><li guid="_bb3ea410-abe3-4fde-a586-6a5210e89ee5-del" id="sec.73E-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">at intervals of not more than 10 years from 1 review to the next.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" change="insReplace" guid="_ce554423-edee-4829-b873-30cea5f2c43d" id="sec.73D" provision.type="other" spent.amends="0"><no>73D</no><heading guid="_679272c6-2a8f-479b-b14d-8094a6170261" id="sec.73D-he">Definitions for part</heading><block><txt break.before="1">In this part—</txt><deflist><definition affected.by.uncommenced="0" guid="_adb56d57-16e6-4ed1-bd54-1e51be79cf02" id="sec.73D-def.ratenotice_"><txt break.before="1"><defterm guid="_3ad78cfc-eb5f-4e6a-b31f-04264ad9fc80" id="sec.73D-def.ratenotice" type="definition">rate notice</defterm> means a notice issued under the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="yes">City of Brisbane Act 2010</name></legref>, or the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="yes">Local Government Act 2009</name></legref>, to levy rates and charges.</txt></definition><definition affected.by.uncommenced="0" guid="_fb66c2bc-8818-406e-bdf2-68176b1ce5b9" id="sec.73D-def.relevantpayment_"><txt break.before="1"><defterm guid="_48049e72-2a88-433a-8702-b36b6868d29a" id="sec.73D-def.relevantpayment" type="definition">relevant payment</defterm> means an amount paid to a local government under—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_83acf065-062e-4b04-8207-97b89b0deb00" id="sec.73D-def.relevantpayment-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">section 73DA(2); or</txt></block></li><li guid="_d35c378e-ebb8-42ae-b677-f943141be86a" id="sec.73D-def.relevantpayment-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">section 73DB(3)(a).</txt></block></li></list></definition></deflist></block></clause><clause affected.by.uncommenced="0" change="ins" guid="_9ccda065-7d8b-49d8-b408-3d757a9bc24c" id="sec.73DA" provision.type="other" spent.amends="0"><no>73DA </no><heading guid="_dd1b8148-1865-4a73-843c-0513ece5bf41" id="sec.73DA-he">Annual payments to local governments</heading><subclause affected.by.uncommenced="0" guid="_3724485d-fe00-420f-ab2f-e311e46a7957" id="sec.73DA-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A regulation may prescribe an amount, for a financial year, that is to be paid under this section to a local government affected by the waste levy.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bb41ad77-d1e0-4c08-bee0-1a3d91f334e7" id="sec.73DA-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive must pay the amount to the local government.</txt></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_609ce120-8e09-4190-8776-255a78c98703" id="sec.73DB" provision.type="other" spent.amends="0"><no>73DB </no><heading guid="_3baff85e-bb5b-47c0-996c-3d503eebe83b" id="sec.73DB-he">Additional payments to local governments</heading><subclause affected.by.uncommenced="0" guid="_51bf7639-598a-4124-bad8-d859177f7f49" id="sec.73DB-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The local government may request payment of an additional amount for the financial year to further mitigate the direct effects of the waste levy on households in the local government’s local government area.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_71ad8da2-5a0b-49c1-a473-e80931cd6cba" id="sec.73DB-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The request must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cd688b5e-1119-4296-b42b-156d5bb0eae5" id="sec.73DB-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be made in writing to the chief executive; and</txt></block></li><li guid="_9ec35700-cb33-4635-890d-d0766e49a5bd" id="sec.73DB-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">include the information prescribed by regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_be4549c6-70f6-4a17-87ec-902304a838c0" id="sec.73DB-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive must consider the request and must decide to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8dbdf09b-91ba-4f00-9522-74fbc417098b" id="sec.73DB-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">pay to the local government an additional amount the chief executive considers appropriate; or</txt></block></li><li guid="_e77aef4f-68ee-4e5a-823a-4e6bb03fbb74" id="sec.73DB-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">refuse the request.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_ac24a045-ab06-4adb-b68a-4b0d6c8c86de" id="sec.73DC" provision.type="other" spent.amends="0"><no>73DC </no><heading guid="_15e7ce6a-db1c-4dbf-8129-35e5aa040340" id="sec.73DC-he">Use of relevant payments</heading><subclause affected.by.uncommenced="0" guid="_62e1ab75-8332-4f8f-9a39-a9de3aefbb12" id="sec.73DC-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The local government must use a relevant payment to mitigate the direct effects of the waste levy on households in the local government’s local government area.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_30a8a629-2a05-4da7-b65e-0ec4364ebf28" id="sec.73DC-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Subsection (3) applies if the chief executive believes the local government has not used a relevant payment as required under subsection (1).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bfa7ac78-ec96-46f0-9071-f7a93c58e59d" id="sec.73DC-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Until the chief executive is satisfied the local government has used the relevant payment as required under subsection (1), the chief executive must not make any further relevant payments to the local government.</txt></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_e8258060-092f-4a78-bbf9-e3ddecbb9a0e" id="sec.73DD" provision.type="other" spent.amends="0"><no>73DD </no><heading guid="_761dc309-7447-486e-a5c7-a22b6ea583a2" id="sec.73DD-he">Rate notice to include statement about relevant payments</heading><subclause affected.by.uncommenced="0" guid="_76661b47-b9c9-4237-9658-e80c22512a20" id="sec.73DD-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The first rate notice issued to an entity by the local government after receiving a relevant payment must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_21b118b5-9ef7-4adc-b33d-bd62e416808a" id="sec.73DD-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the amount of the payment; and</txt></block></li><li guid="_9b3e4b6d-0112-4862-ad45-c2e6785b56ae" id="sec.73DD-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the purpose for which the payment has been, or will be, used.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_15a5f67d-b06e-4b3a-9a6f-6aa64f00decf" id="sec.73DD-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Subsection (3) applies if the chief executive believes the local government has not complied with subsection (1) in relation to an entity.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_474ced01-bedf-4eec-ba02-e9a0562cc6f5" id="sec.73DD-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Until the chief executive is satisfied the local government has informed the entity of the matters mentioned in subsection (1), the chief executive may refuse to make any further relevant payments to the local government.</txt></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_6d838e3a-dc68-4368-84de-26e38d85b5f8" id="sec.73DE" provision.type="other" spent.amends="0"><no>73DE </no><heading guid="_e25b3f04-c236-40a7-83fb-4bb60b8a955c" id="sec.73DE-he">Local government must not distribute misinformation</heading><subclause affected.by.uncommenced="0" guid="_709ba6bf-eeb9-44bd-b7c6-ddacfb0919b5" id="sec.73DE-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the chief executive believes the local government has, after receiving a relevant payment, distributed misinformation in relation to the payment.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ffc832a9-b458-4e6a-9849-9542fb91bc50" id="sec.73DE-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Until the chief executive is satisfied the local government has informed the intended recipients of the misinformation of how the misinformation is false or misleading, the chief executive may refuse to make any further relevant payments to the local government.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_12809b29-8ec2-4629-8d77-cededb8a3d9e" id="sec.73DE-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A local government is taken to distribute misinformation if the local government—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fc95f816-954b-4a6d-9e49-4e2901a79b41" id="sec.73DE-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">includes the misinformation in a rate notice, or other document, issued by the local government; or</txt></block></li><li guid="_2c728f81-9312-402c-a88d-5c077aee9f5f" id="sec.73DE-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">publishes the misinformation on the local government’s website; or</txt></block></li><li guid="_2ae5132c-4bb9-4481-b39e-6d0554ee4984" id="sec.73DE-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">includes the misinformation in an advertisement made by, or on behalf of, the local government.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_219bc21e-eb8a-456f-a8cd-5f859490b773" id="sec.73DE-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_73182041-9401-4e09-bdda-856980946526" id="sec.73DE-ssec.4-def.misinformation_"><txt break.before="1"><defterm guid="_ed74be91-d713-4c55-9ef5-4c0ea75b5642" id="sec.73DE-ssec.4-def.misinformation" type="definition">misinformation</defterm>, in relation to a relevant payment received by a local government, means a false or misleading statement about—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_839ee6f3-0ead-4d47-9990-858561853d3c" id="sec.73DE-ssec.4-def.misinformation-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the effect of the waste levy on the local government or households in the local government’s local government area; or</txt></block></li><li guid="_8bb9ada3-3e2d-4dd0-b75e-45d405039237" id="sec.73DE-ssec.4-def.misinformation-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the amount of the payment; or</txt></block></li><li guid="_e51b72c3-8a1c-4010-b40e-cee445a0c003" id="sec.73DE-ssec.4-def.misinformation-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the purpose of the payment.</txt></block></li></list></definition></deflist></block></subclause></clause></part><part affected.by.uncommenced="0" change="ins" guid="_b2b4ccc8-c803-4a6f-b3c2-787e8634cfc1" id="ch.3-pt.8"><no>Part 8</no><heading guid="_67c5b6f6-c1f4-4a8b-864a-ac6f7267c559" id="ch.3-pt.8-he">Review of efficacy of waste levy</heading><clause affected.by.uncommenced="0" guid="_67992da1-ee56-45ff-af73-077dc9fbdbb7" id="sec.73E" provision.type="other" spent.amends="0"><no>73E</no><heading guid="_ff2c722e-9564-4e51-8b84-5a7427aa38f1" id="sec.73E-he">Review of efficacy of waste levy</heading><block><txt break.before="1">The chief executive must review the efficacy of the waste levy—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_424abe2a-5eda-448c-bf8e-19a906afb565" id="sec.73E-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">within 3 years after the commencement; and</txt></block></li><li guid="_bb3ea410-abe3-4fde-a586-6a5210e89ee5" id="sec.73E-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">at intervals of not more than 10 years from 1 review to the next.</txt></block></li></list></block></clause></part></chapter><chapter affected.by.uncommenced="0" guid="_d097040d-7d09-4509-a319-3458078dbcf6" id="ch.4"><no>Chapter 4</no><heading guid="_1ad4367d-57fa-4d17-8d99-f98e79bacc4b" id="ch.4-he">Management of priority products and priority waste</heading><part affected.by.uncommenced="0" guid="_7c5d3472-4397-4902-9a97-49421f76d8b5" id="ch.4-pt.1"><no>Part 1</no><heading guid="_2002cd06-c65f-4f92-9f6c-d015ba489840" id="ch.4-pt.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_309a65f8-7e49-4c65-8736-e1a9485d4974" id="sec.74" provision.type="other" spent.amends="0"><no>74</no><heading guid="_b4aa1633-a7a2-4372-814d-4f5bdb5f67b5" id="sec.74-he">Purpose of chapter</heading><block><txt break.before="1">The purpose of this chapter is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a5b3caf4-6c4a-46f0-b0d0-5fa2e341b431" id="sec.74-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to encourage, and in particular circumstances to require, persons who are involved in the life cycle of a product to share responsibility for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2b3924a8-9451-49c0-acb0-678299adf9c9" id="sec.74-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">ensuring that, for the product, there is effective waste avoidance, reduction, re-use, recycling, recovery or treatment; and</txt></block></li><li guid="_c69eaccc-91c4-4155-ae35-9eb6fc30cec3" id="sec.74-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">managing the impacts of the product throughout its life cycle, including end-of-use management; and</txt></block></li></list></block></li><li guid="_46561ac4-2983-47af-b731-38e6569fd6e1" id="sec.74-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—to improve the management of waste that is not a product.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_bcaa9b29-55ad-4836-a0c0-e5e2c0d254cf" id="sec.74A" provision.type="other" spent.amends="0"><no>74A</no><heading guid="_0cd0d51e-7cf3-4757-ad6e-ada84c2a79b0" id="sec.74A-he">Definitions for ch 4</heading><block><txt break.before="1">In this chapter—</txt><deflist><definition affected.by.uncommenced="0" guid="_1c71bfc4-7559-40a7-b89d-18d168c359c6" id="sec.74A-def.producer_"><txt break.before="1"><defterm guid="_9c4e48e1-7224-43db-89dc-154bd877e3d7" id="sec.74A-def.producer" type="definition">producer</defterm>, of a product, includes any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_818e0e05-9138-43db-8268-eb7a2cbab852" id="sec.74A-def.producer-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the manufacturer of the product;</txt></block></li><li guid="_ff358151-2d01-4b0b-b87a-90ebd1d4a16f" id="sec.74A-def.producer-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a person who imports the product into Queensland;</txt></block></li><li guid="_06121527-a964-4ee9-9657-fed445a9080b" id="sec.74A-def.producer-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a person who supplies the product in Queensland;</txt></block></li><li guid="_1eb8a052-69cb-4d72-b79f-271f7d6384d3" id="sec.74A-def.producer-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a person who has a legal or equitable interest in the name under which the product is supplied in Queensland.</txt></block></li></list></definition></deflist></block></clause></part><part affected.by.uncommenced="0" guid="_aebf4c27-c11e-444c-ac6f-8df8171f1835" id="ch.4-pt.2"><no>Part 2</no><heading guid="_cdabf6c1-3fe7-4857-93ed-59b4d8a72a2a" id="ch.4-pt.2-he">Priority products and priority waste</heading><clause affected.by.uncommenced="0" guid="_e767f074-74a7-4bd7-8c44-a2c5fadf6de6" id="sec.75" provision.type="other" spent.amends="0"><no>75</no><heading guid="_ac13ab36-0723-4122-92ee-e2b717a15492" id="sec.75-he">Preparation and notification of draft priority statement</heading><subclause affected.by.uncommenced="0" guid="_75a6b936-a03c-48a0-91bd-3123f4a95229" id="sec.75-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a68b3427-45c5-48e1-bd09-ceafd47b9eaa" id="sec.75-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">prepare a draft priority statement for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a6c4121d-6549-4114-9915-c41178f5f65c" id="sec.75-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">1 or more products; or</txt></block></li><li guid="_de046854-2856-4f8a-aedd-031755d7ad7a" id="sec.75-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">1 or more categories of waste; and</txt></block></li></list></block></li><li guid="_00b25da3-33f8-4127-8abd-84f67d244b21" id="sec.75-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">advertise the existence and availability of the statement by notice published on the department’s website and in any other way the chief executive considers appropriate.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2c3ee344-d8a6-49e1-94fd-d1ce381ff5cd" id="sec.75-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5806b2ea-3e1e-4e4d-9ab6-1c4d3b6ee91e" id="sec.75-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">how copies of the draft priority statement may be obtained or accessed; and</txt></block></li><li guid="_f4d309b3-7b1c-49db-b6b7-b6e1bb14a0cb" id="sec.75-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the period, of at least 28 days after publication of the notice, within which a person may make a written submission to the chief executive about any matter relevant to the statement.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d21f8f40-3f79-48b6-bbf8-3436228016a8" id="sec.76" provision.type="other" spent.amends="0"><no>76</no><heading guid="_8286efd0-87d8-4271-ad93-a25cad7389af" id="sec.76-he">Requirements for draft priority statement</heading><subclause affected.by.uncommenced="0" guid="_e6b59dfe-4538-4ef1-8b25-f69334accd6b" id="sec.76-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The draft priority statement must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e630e79e-c04b-4acc-9a43-ce3f5456012a" id="sec.76-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the products or category of waste intended to be included in the final statement as priority products or priority waste; and</txt></block></li><li guid="_03123a23-4d88-41c7-9284-8fa60c6709b4" id="sec.76-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">how each proposed product or the proposed category of waste satisfies the criteria under <intref check="valid" refid="sec.77" target.guid="_45c97013-ccd1-4148-89d9-931fc2c635c3">section 77</intref>; and</txt></block></li><li guid="_031c9668-8af8-4ee8-abf4-82340f76de72" id="sec.76-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the management options under consideration for each proposed product, a strategic waste planning option, an end of waste code or an end of waste approval.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ec4edeea-4d54-43d0-bba8-510caa9da43e" id="sec.76-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In deciding whether to include a product or category of waste in the draft priority statement, the chief executive must consider—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f981a88b-6089-4cf0-84ea-48d79d9fc7c7" id="sec.76-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">whether the product or category of waste satisfies the criteria under <intref check="valid" refid="sec.77" target.guid="_45c97013-ccd1-4148-89d9-931fc2c635c3">section 77</intref>; and</txt></block></li><li guid="_5cda2e3e-5a4b-4f2f-b63a-8df3e0a604a9" id="sec.76-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether action is proposed or is currently in progress for the product or category of waste through a national approach; and</txt></block></li><li guid="_59f56305-a9cf-400e-8bec-046c9a05ca6f" id="sec.76-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">whether there are significant benefits from taking action to reduce impacts from disposal of the product or category of waste.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5c57b6c5-96a4-4631-bc1c-7cb74ece2ac5" id="sec.76-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In deciding the management options to be stated under <intref check="valid" refid="sec.76-ssec.1" target.guid="_e6b59dfe-4538-4ef1-8b25-f69334accd6b">subsection (1)</intref><intref check="valid" refid="sec.76-ssec.1-para1.c" target.guid="_031c9668-8af8-4ee8-abf4-82340f76de72">(c)</intref>, the chief executive must have regard to the waste and resource management hierarchy and the waste and resource management principles.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a103dba1-2827-4a90-9a4c-c528d56dfc36" id="sec.76-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In preparing a draft priority statement, the chief executive may consult with any expert reference group or other entity the chief executive considers appropriate.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_45c97013-ccd1-4148-89d9-931fc2c635c3" id="sec.77" provision.type="other" spent.amends="0"><no>77</no><heading guid="_08ddaf8e-356a-421a-b4a1-b3740cbc5e33" id="sec.77-he">Criteria for a priority product or priority waste</heading><block><txt break.before="1">A product or category of waste satisfies the criteria for a priority product or priority waste if at least 2 of the following apply to the product or category of waste—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_25bcec8e-dd5a-4991-a9a4-ffeaf2a3331c" id="sec.77-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the product or category of waste contains hazardous or toxic substances;</txt></block></li><li guid="_8e15d781-45b9-48b6-b66d-2e74781aba51" id="sec.77-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">there is potential to reduce the consumption of resources through improved management of the product or category of waste;</txt></block></li><li guid="_1dbee58c-a5b5-4d05-ab8d-b81009b5595f" id="sec.77-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">there is potential to reduce the environmental impacts of the disposal of the product or category of waste through improved management of the product or category of waste;</txt><note guid="_a797ddc3-4c15-4f23-94c0-77ce078fa453" id="sec.77-para1.c-note" type="example"><heading guid="_3a6c3991-d15d-4abe-925c-e067cb679ab4" id="sec.77-para1.c-note-he">Examples of environmental impacts—</heading><block><txt break.before="1">greenhouse gas emissions from landfill, occurrence of leachates</txt></block></note></block></li><li guid="_540fc650-bfcf-4d8e-83ad-7dd38fb4a9e6" id="sec.77-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">there is potential to reduce the social impacts of the disposal of the product or category of waste through improved management of the product or waste;</txt><note guid="_af0aada8-fe31-46ee-ae18-9809f0d4dd92" id="sec.77-para1.d-note" type="example"><heading guid="_a77ecac0-4fdf-406d-a8f3-96a1c18a1375" id="sec.77-para1.d-note-he">Examples of social impacts—</heading><block><txt break.before="1">danger to waste management workers, community concern, amenity</txt></block></note></block></li><li guid="_5fa31f66-c450-40a1-92f1-6bd4a61ec45a" id="sec.77-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">treating or disposing of the product or category of waste involves a significant cost to the community;</txt></block></li><li guid="_6ab68050-ce59-44d3-95be-13efb5415900" id="sec.77-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">improved management of the product or category of waste is likely to create business opportunities that would contribute to the economy.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_7f16495e-edc1-47da-b83c-2cbc154e2202" id="sec.78" provision.type="other" spent.amends="0"><no>78</no><heading guid="_1a953568-ea31-409b-9894-6328d1021e74" id="sec.78-he">Inclusion of invitation for voluntary product stewardship scheme</heading><subclause affected.by.uncommenced="0" guid="_eb43f2b4-4593-41e9-8f44-832dad38645d" id="sec.78-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may include in the final priority statement, for a particular product included in the final statement, an invitation (a <defterm guid="_68324a08-7365-44bc-913a-f846109ce9d4" id="sec.78-def.schemeinvitation" type="definition">scheme invitation</defterm>) for persons to submit a proposed voluntary product stewardship scheme for accreditation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1d7df21f-3c08-4541-893a-94229263a5c2" id="sec.78-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, in including a scheme invitation, the chief executive must have regard to the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2e474def-3f5b-45f9-8c1d-89f83613d5dc" id="sec.78-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">whether the product can be effectively managed under a voluntary product stewardship scheme;</txt></block></li><li guid="_d06e73bd-6475-4406-99e5-688c5436ab3f" id="sec.78-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether an approved program is in existence for the product and whether the program is being appropriately implemented.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_15215e5e-7b49-4f1f-9719-ed3de2c09bce" id="sec.78-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A scheme invitation must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_535afd48-bca1-41f6-92e0-9b0da5d6bf1b" id="sec.78-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the period, of at least 18 months, within which any proposed voluntary product stewardship scheme would have to be submitted for accreditation; and</txt></block></li><li guid="_4de1d7eb-cb8d-4d9b-aab9-51185912a991" id="sec.78-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the expected outcomes from any proposed voluntary product stewardship scheme; and</txt></block></li><li guid="_81626792-b104-4753-b0da-2f6424bf7d8c" id="sec.78-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that if no voluntary product stewardship scheme is accredited for the product, a regulation may be made to establish a regulated product stewardship scheme for the product.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_64a7e9d2-c9d6-43f4-a423-af39e6e9a448" id="sec.78-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A scheme invitation may state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_45388140-2097-4e75-8fba-2cc0524bdaa5" id="sec.78-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">any limitations to the scope of a proposed voluntary product stewardship scheme, including for example geographic or business type or size limitations; and</txt></block></li><li guid="_c7c53c50-95e4-4ccd-9e03-63a5c9888262" id="sec.78-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">other matters relevant to a voluntary product stewardship scheme for the particular product.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c91dd994-97ae-4731-a065-0f6af38c23b2" id="sec.78-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The chief executive is not stopped from subsequently granting a single extension of the period mentioned in <intref check="valid" refid="sec.78-ssec.3" target.guid="_15215e5e-7b49-4f1f-9719-ed3de2c09bce">subsection (3)</intref><intref check="valid" refid="sec.78-ssec.3-para1.a" target.guid="_535afd48-bca1-41f6-92e0-9b0da5d6bf1b">(a)</intref> for not more than 1 year at the request of the proposed scheme manager for a proposed voluntary product stewardship scheme.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_de8d06d9-f1c0-43dc-9c8f-031558322549" id="sec.79" provision.type="other" spent.amends="0"><no>79</no><heading guid="_88e2a589-d2b2-4a37-a6dc-48d310749fc5" id="sec.79-he">Finalisation of priority statement</heading><subclause affected.by.uncommenced="0" guid="_a3f5c16f-638c-44c5-a52e-dbece8a3f2ea" id="sec.79-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must prepare, and give to the Minister, a final version of the priority statement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a8b30cbd-53ea-4f31-bb27-a72fcea640a8" id="sec.79-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">When preparing the final priority statement, the chief executive must consider all submissions made to the chief executive on the draft priority statement under <intref check="valid" refid="sec.75" target.guid="_e767f074-74a7-4bd7-8c44-a2c5fadf6de6">section 75</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_877962b6-10dc-44d7-b491-d079dd294547" id="sec.80" provision.type="other" spent.amends="0"><no>80</no><heading guid="_ef3adad1-5816-4c2c-aef8-393934d339dd" id="sec.80-he">Approval of final priority statement</heading><subclause affected.by.uncommenced="0" guid="_e478f3a9-9694-4bc9-9c7e-1bf2c19fa691" id="sec.80-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The final priority statement does not have effect as a priority statement under this Act until it has been approved by the Minister by gazette notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f8713e13-96f2-4bbe-ae49-eaff15d52e68" id="sec.80-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The priority statement comes into effect on the day the Minister’s approval is gazetted or on a later day stated in the gazette notice or in the priority statement for that purpose.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_21037118-0a56-4c60-995e-3204f0e7fc4c" id="sec.80-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The gazette notice in which the Minister approves the priority statement must include details about where a copy of the priority statement may be inspected and obtained.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_cb7a691c-4741-40ae-a1e6-80c441f4583a" id="sec.80-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive must publish the priority statement on the department’s website as soon as practicable after its approval.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0ce49fd8-49cf-4314-a176-6cf64d874fd2" id="sec.81" provision.type="other" spent.amends="0"><no>81</no><heading guid="_97a6c68a-5383-47ac-8ef1-dbf094dcea8a" id="sec.81-he">Minor amendment of priority statement</heading><subclause affected.by.uncommenced="0" guid="_defdc8db-ca16-4c39-a697-8c2e4fda0525" id="sec.81-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A minor amendment of the priority statement may be made without the requirements of this part having been complied with, other than the requirement for approval by the Minister by gazette notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bd7456b6-e1ce-48d8-a5b5-dc53a8e45fab" id="sec.81-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_a7854ceb-3eef-4bf9-a78d-6e606e591770" id="sec.81-ssec.2-def.minoramendment_"><txt break.before="1"><defterm guid="_6cca9288-9047-47bf-8bf5-abd1aa04848d" id="sec.81-ssec.2-def.minoramendment" type="definition">minor amendment</defterm>, of the priority statement, means an amendment or replacement of the statement—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_56e39902-8098-4a6c-bdc9-0d30df6abccd" id="sec.81-ssec.2-def.minoramendment-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to correct a minor error in the statement; or</txt></block></li><li guid="_4590519e-1070-4a03-b4a4-c67adf60c5f0" id="sec.81-ssec.2-def.minoramendment-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to make another change that is not a change of substance.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d462df5b-b2a0-49a0-8841-f797da9d0355" id="sec.82" provision.type="other" spent.amends="0"><no>82</no><heading guid="_38ac9dda-0b7a-4f60-a38d-7c5973fa8fce" id="sec.82-he">Review of priority statement</heading><subclause affected.by.uncommenced="0" guid="_599dcecd-6cf0-4781-a45b-624a1f23afc4" id="sec.82-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">At least once every 3 years, the chief executive must review the priority statement and amend or replace the statement having regard to the outcome of the review.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f23d6c83-0e26-4213-b57c-432cc0f4ffe9" id="sec.82-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the process of review includes public consultation that in substance is equivalent to that required for the first draft priority statement under this chapter, the chief executive may prepare and give to the Minister, for approval by gazette notice, a final amending or replacement priority statement without having first prepared and consulted on a draft amending or replacement statement.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_c118d5c7-83ac-47cd-9341-587ad04b48c9" id="ch.4-pt.3"><no>Part 3</no><heading guid="_697a5aec-3dea-43aa-a799-55e3b3417a16" id="ch.4-pt.3-he">Product stewardship schemes</heading><division affected.by.uncommenced="0" guid="_524d1840-fe7f-45ec-bf0f-8c21bedd0bcb" id="ch.4-pt.3-div.1"><no>Division 1</no><heading guid="_164f9975-d627-472e-a002-d5d1eaf18407" id="ch.4-pt.3-div.1-he">Product stewardship schemes generally</heading><clause affected.by.uncommenced="0" guid="_1caf4eea-d1c8-4946-854b-834ff84c274c" id="sec.83" provision.type="other" spent.amends="0"><no>83</no><heading guid="_bcc233bd-23f5-4660-a9b7-9bb19ed9a56a" id="sec.83-he">What is a <defterm guid="_e48f76ca-5963-48bc-abf2-cc32fe98448b" type="mention">product stewardship scheme</defterm></heading><block><deflist><block><txt break.before="1">A <defterm guid="_37b4daf8-f567-48a5-8ba2-8a0aca41cbfa" id="def.productstewardshipscheme" type="definition">product stewardship scheme</defterm> is a scheme—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a5fe25da-5189-4826-baff-ce213223d9b2" id="sec.83-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in which persons who are involved in the life cycle of a product share responsibility for the management and impact of the product throughout its life cycle, including end-of-use management; and</txt></block></li><li guid="_88672b04-bed0-4e05-8e58-b4122d56e7fc" id="sec.83-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that seeks to redress the adverse impacts of a product.</txt></block></li></list></block></deflist></block></clause><clause affected.by.uncommenced="0" guid="_ec14709a-f2fa-49f2-8218-f21075952d34" id="sec.84" provision.type="other" spent.amends="0"><no>84</no><heading guid="_980a1195-a6ec-4e32-9c79-3187ec44e04e" id="sec.84-he">What is a <defterm guid="_5f04a2f4-f004-4893-b18f-21342e592f82" type="mention">voluntary product stewardship scheme</defterm></heading><block><deflist><block><txt break.before="1">A <defterm guid="_a97949ed-495e-479f-9368-ed16e451a2a1" id="def.voluntaryproductstewardshipscheme" type="definition">voluntary product stewardship scheme</defterm> is a product stewardship scheme under which the participants in the scheme, as identified in the scheme, voluntarily share responsibility for the management and impact of the product.</txt></block></deflist></block></clause><clause affected.by.uncommenced="0" guid="_996980af-422f-4706-8c10-f826b26d4403" id="sec.85" provision.type="other" spent.amends="0"><no>85</no><heading guid="_fa23dc59-b069-4364-bd2c-e5e340fa1fe1" id="sec.85-he">What is a <defterm guid="_b2d46578-4a42-444c-ad50-eb778021ebcd" type="mention">regulated product stewardship scheme</defterm></heading><block><deflist><block><txt break.before="1">A <defterm guid="_b581acaa-5bf2-446b-9d0a-1d7dc621ca27" id="def.regulatedproductstewardshipscheme" type="definition">regulated product stewardship scheme</defterm> is a product stewardship scheme that is prescribed under a regulation under this part for a priority product.</txt></block></deflist></block></clause><clause affected.by.uncommenced="0" guid="_949d5d58-559e-4099-9f0b-2e741b5219cb" id="sec.86" provision.type="other" spent.amends="0"><no>86</no><heading guid="_d3fbbc2f-83bf-4fa6-98f8-f8c1a282475d" id="sec.86-he">What is an <defterm guid="_290d7407-b773-4ac8-aebb-1d09cd0ec86a" type="mention">approved program</defterm></heading><block><deflist><block><txt break.before="1">An <defterm guid="_9eb94476-eafb-41ad-a2e2-95170940b296" id="def.approvedprogram" type="definition">approved program</defterm>, for a product, is a program, scheme or agreement applying to the product in a way that is substantially similar to the way a product stewardship scheme would apply to the product, but only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_90e693af-7fa6-446d-8b00-1acaf5d90227" id="sec.86-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the State is a signatory to the program, scheme or agreement; or</txt></block></li><li guid="_bae9bff2-7c80-4546-9c12-43f150626651" id="sec.86-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the State has entered into a memorandum of understanding or similar arrangement supporting the application of the program, scheme or agreement; or</txt></block></li><li guid="_6e73eadd-ea9c-47e6-9581-efbd32bf4749" id="sec.86-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the State has been a party to the development and finalisation of the program, scheme or agreement; or</txt></block></li><li guid="_30f41944-6130-4080-93b8-c95a8bb21d60" id="sec.86-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the program, scheme or agreement has been accredited or approved as part of a national product stewardship framework to which the State is a party.</txt></block></li></list></block></deflist></block></clause><clause affected.by.uncommenced="0" guid="_afd9f14c-0c89-4aef-81b7-03178dc6e94f" id="sec.87" provision.type="other" spent.amends="0"><no>87</no><heading guid="_a2620bdd-8d91-4658-ad67-c5ab5c2b2f24" id="sec.87-he">When is a product stewardship scheme in force for a product</heading><subclause affected.by.uncommenced="0" guid="_5a3a7991-9895-401d-8c2c-eb185be5f610" id="sec.87-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A product stewardship scheme is in force for a product if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_18ccd3b5-3188-46f7-a713-f0891e0e1071" id="sec.87-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">it is a voluntary product stewardship scheme applying to the product, and the scheme has been accredited by the chief executive under this part; or</txt></block></li><li guid="_c12b37b7-31bb-4aea-be6c-5719cd020940" id="sec.87-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">it is a regulated product stewardship scheme applying to the product.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ad9813da-2263-4950-be54-55a4fbeda6d3" id="sec.87-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A product stewardship scheme mentioned in <intref check="valid" refid="sec.87-ssec.1" target.guid="_5a3a7991-9895-401d-8c2c-eb185be5f610">subsection (1)</intref><intref check="valid" refid="sec.87-ssec.1-para1.a" target.guid="_18ccd3b5-3188-46f7-a713-f0891e0e1071">(a)</intref> is an <defterm guid="_7ac2a801-3ae8-4bd2-a6d0-93349be7d915" id="sec.87-def.accreditedproductstewardshipscheme" type="definition">accredited product stewardship scheme</defterm>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b3f54d6f-1994-47fb-9a52-1cc4b3de5bc5" id="sec.88" provision.type="other" spent.amends="0"><no>88</no><heading guid="_f3ddb179-7498-4099-bb76-6150be3198fc" id="sec.88-he">Accredited product stewardship scheme does not override laws</heading><block><txt break.before="1">An accredited product stewardship scheme has no effect to the extent it is inconsistent with any law of the State or the Commonwealth.</txt><note guid="_d65d3001-2675-4032-a395-034d830dee2e" id="sec.88-note" type="example"><heading guid="_3bbeaa03-fec0-42ff-acae-ccdc1aeec2c5" id="sec.88-note-he">Example—</heading><block><txt break.before="1">A provision of a voluntary product stewardship scheme for a product would have no effect to the extent it purported to require a participant in the scheme to deal with the product in a way prohibited under the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Environmental Protection Act</name></legref>.</txt></block></note></block></clause></division><division affected.by.uncommenced="0" guid="_7f02875f-5a34-4773-ad29-0c5d86a4072f" id="ch.4-pt.3-div.2"><no>Division 2</no><heading guid="_b008529e-3e0f-4bdf-905f-5dd65da4dc88" id="ch.4-pt.3-div.2-he">Accreditation of voluntary product stewardship schemes</heading><clause affected.by.uncommenced="0" guid="_89579597-3bb3-49a0-8383-f0380ba39ae1" id="sec.89" provision.type="other" spent.amends="0"><no>89</no><heading guid="_2a8f7ce6-173c-4544-a649-2aaf25b1bf34" id="sec.89-he">Application for accreditation</heading><subclause affected.by.uncommenced="0" guid="_0953c879-0dac-408d-97f0-ecf53601782a" id="sec.89-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The person who is identified in a proposed voluntary product stewardship scheme as the scheme manager for the scheme may apply to the chief executive for accreditation of the scheme.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2d76878f-d5fe-46cb-8bfe-8ad0cbc3a73a" id="sec.89-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An application under <intref check="valid" refid="sec.89-ssec.1" target.guid="_0953c879-0dac-408d-97f0-ecf53601782a">subsection (1)</intref> must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_51488f56-2cfe-453c-95cc-c321232244ee" id="sec.89-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li guid="_3fc8143c-845d-4f56-bed2-5b5acefff33a" id="sec.89-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">include the information prescribed under a regulation; and</txt></block></li><li guid="_864569bf-7d9b-4737-9c14-7a117541df1e" id="sec.89-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">be accompanied by the fee prescribed under a regulation; and</txt></block></li><li guid="_eda0f85c-2071-4413-9b5a-167a3a0a7635" id="sec.89-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">if it is a proposed voluntary product stewardship scheme for a priority product—explain how the proposed scheme meets the requirements of this chapter for a product stewardship scheme for a priority product; and</txt></block></li><li guid="_549ef0e1-1413-4e90-aea3-ebfbcd135740" id="sec.89-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">state whether a regulation is required to facilitate the implementation or operation of the scheme; and</txt></block></li><li guid="_3a0a351f-cad8-477c-886b-0af9ee9509c7" id="sec.89-ssec.2-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">include evidence of the agreement of persons identified as participants in the scheme.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_4636f344-7049-4368-a13b-ce05c2c01aec" id="sec.90" provision.type="other" spent.amends="0"><no>90</no><heading guid="_887fce16-a9d8-44d1-9238-98dfa2f85d1a" id="sec.90-he">Requirements for accreditation</heading><subclause affected.by.uncommenced="0" guid="_132bf6e9-b629-40e5-a627-5f329d455300" id="sec.90-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">To qualify for accreditation under this part, the proposed voluntary product stewardship scheme must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7072f5f0-39fa-400d-bb88-c25e2e26c495" id="sec.90-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">identify the scheme manager for the scheme; and</txt></block></li><li guid="_05353f49-2915-4b35-a970-24ccc3cb9281" id="sec.90-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">describe the scope of the scheme and identify, whether or not by reference to brand, the product to which the scheme applies; and</txt></block></li><li guid="_03a9b969-0b75-40d4-9606-61c2d5058185" id="sec.90-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">include the following information—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3961fac2-c6c2-41b7-8cfe-a04757a6a60f" id="sec.90-ssec.1-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">how long the scheme is to be in force;</txt></block></li><li guid="_ee7dac02-17a8-4b2f-bd9a-e352a5be6ee2" id="sec.90-ssec.1-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">targets for avoiding, re-using or recycling of waste for the product;</txt></block></li><li guid="_c4d42cff-2573-4963-a782-ab71e8af2e31" id="sec.90-ssec.1-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">time frames for achieving each target;</txt></block></li><li guid="_a71b4a22-5c5b-4ad4-b3d2-6dd0f2128a57" id="sec.90-ssec.1-para1.c-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">the information that is to be collected, assessed and audited to gauge performance of the scheme;</txt></block></li><li guid="_ab1cdf56-9507-4a6b-9cb3-8924af285993" id="sec.90-ssec.1-para1.c-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">how the public is to be advised of information about the scheme; and</txt></block></li></list></block></li><li guid="_0714f697-d0e1-4a40-aff2-3212a336446c" id="sec.90-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">list the classes of persons involved in the design, manufacture, sale, use, servicing, collection, recovery, recycling, treatment or disposal of the product; and</txt></block></li><li guid="_e4941852-4be9-43eb-a8a1-cb9817eeaff0" id="sec.90-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">list the participants in the scheme and assign to them their respective responsibilities for meeting the scheme’s objectives; and</txt></block></li><li guid="_4fba749e-4ebd-4862-b441-34e0a2842757" id="sec.90-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">state the arrangements for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1ca676b0-73e4-4236-8251-fc6e2efb791b" id="sec.90-ssec.1-para1.f-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">making decisions under the scheme; and</txt></block></li><li guid="_14985f13-0c9e-43f4-b369-6484860ec3e3" id="sec.90-ssec.1-para1.f-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the control and overall operation of the scheme; and</txt></block></li><li guid="_ef75fc64-833f-47f1-9418-3cf73b32472d" id="sec.90-ssec.1-para1.f-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">keeping records and making reports under the scheme; and</txt></block></li></list></block></li><li guid="_686bf8f3-eec2-4783-897f-3e5e75fb1f1a" id="sec.90-ssec.1-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">state the date the scheme ends; and</txt></block></li><li guid="_6341f5ff-5977-46d3-bcac-0c6991dd9c60" id="sec.90-ssec.1-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">identify the processes for compliance with, and enforcement of, any agreements between the participants in the scheme; and</txt></block></li><li guid="_852c3eff-ba12-4546-a294-d60b455f5d80" id="sec.90-ssec.1-para1.i" provision.type="other"><no>(i)</no><block><txt break.before="0">provide for assessing the scheme’s performance and for reporting on its performance to the Minister; and</txt></block></li><li guid="_4965577d-b402-4913-a9fa-a5d84abc6c6f" id="sec.90-ssec.1-para1.j" provision.type="other"><no>(j)</no><block><txt break.before="0">state a strategy for publication of the scheme; and</txt></block></li><li guid="_b1e6069d-993c-45a2-8902-b98367a98e84" id="sec.90-ssec.1-para1.k" provision.type="other"><no>(k)</no><block><txt break.before="0">state how information will be provided to purchasers, users and handlers of the product; and</txt></block></li><li guid="_b80a50ee-b69c-42a4-8e64-b69ae2556630" id="sec.90-ssec.1-para1.l" provision.type="other"><no>(l)</no><block><txt break.before="0">clearly outline how the scheme will be funded; and</txt></block></li><li guid="_37f3340a-f9cf-4fbd-b4c6-97e018ece5ad" id="sec.90-ssec.1-para1.m" provision.type="other"><no>(m)</no><block><txt break.before="0">if the product under the proposed scheme is a priority product and the priority statement includes recommendations for improving management of the product—show how those recommendations are taken account of.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6153d468-d284-4e1c-9e22-f585b9a63325" id="sec.90-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The proposed scheme may include any other matter a producer of the product considers relevant.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_601f2b54-7977-4940-a872-7d7a8e54d354" id="sec.91" provision.type="other" spent.amends="0"><no>91</no><heading guid="_032099e8-8585-4a21-96f8-3539b778b286" id="sec.91-he">Accreditation</heading><block><txt break.before="1">In deciding whether to accredit a proposed voluntary product stewardship scheme for a product the chief executive must have regard to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9883275a-1767-4fcd-9cfe-803d4f4caf52" id="sec.91-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">whether the application for accreditation meets the requirements of this part for an application; and</txt></block></li><li guid="_87dae4d6-fea2-40a7-97d3-d86b952a41d9" id="sec.91-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether the proposed scheme meets the requirements of this part for accreditation; and</txt></block></li><li guid="_1d4a0317-7578-44b6-a691-c23965844669" id="sec.91-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">whether the proposed scheme’s targets are likely to be met within the time frames stated in the scheme; and</txt></block></li><li guid="_1cad6dbe-7a94-4d04-81dc-15fa32aecf90" id="sec.91-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">whether the proposed scheme is likely to promote waste reduction or reduce environmental impact from disposing of the product without, in either case, causing greater impact over the life cycle of the product; and</txt></block></li><li guid="_2d3f7cb8-597c-4dc9-911c-d416349fcca3" id="sec.91-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">whether the proposed scheme is consistent with the State’s obligations under national arrangements; and</txt></block></li><li guid="_5da8275c-36e3-4fa2-a9fe-a33795d70631" id="sec.91-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">if the product is a priority product that was the subject of a scheme invitation—whether the proposed scheme is likely to achieve the expected outcomes of any proposed voluntary product stewardship scheme stated in the invitation; and</txt></block></li><li guid="_fe7fb23b-3f05-41ed-a905-7dfab5c553d2" id="sec.91-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">if the product is a priority product, whether or not it was the subject of a scheme invitation—whether the proposed scheme takes account of recommendations included in the priority statement for the priority product.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_64b7da03-67f2-4219-aa9e-fb01814b7392" id="sec.92" provision.type="other" spent.amends="0"><no>92</no><heading guid="_b21038c9-b160-4dc9-bc9d-8537b4cbb7c8" id="sec.92-he">Inquiry about application</heading><block><txt break.before="1">Before deciding the application, the chief executive may by notice ask for further information from—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2cdf33b5-2e10-474d-9132-b0431e6e4c8d" id="sec.92-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the scheme manager; or</txt></block></li><li guid="_eb7f3e30-760d-4f42-b5c7-0012e95adcf8" id="sec.92-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">through the scheme manager—any person who, in the opinion of the chief executive, is likely to be significantly affected by the scheme.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_764f46cf-f5c6-4d61-b941-8e53bd42c299" id="sec.93" provision.type="other" spent.amends="0"><no>93</no><heading guid="_7d3d906e-7c37-497b-b480-d2ba9c857bf0" id="sec.93-he">Deciding application</heading><subclause affected.by.uncommenced="0" guid="_0f589241-3de5-497e-b244-b537a1f07a2f" id="sec.93-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">As soon as practicable after deciding to accredit a proposed voluntary product stewardship scheme, the chief executive must give the scheme manager for the scheme notice of the decision to accredit.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_45be10fd-8989-41b8-9277-2c28880aae5c" id="sec.93-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the chief executive refuses to grant the application, the chief executive must as soon as practicable give the applicant an information notice for the decision to refuse.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_ae3b5e07-9608-4b9c-b3b7-457416761f53" id="sec.94" provision.type="other" spent.amends="0"><no>94</no><heading guid="_be865d3c-42f8-4e0d-a513-ff503ba1137a" id="sec.94-he">Register of accredited schemes</heading><subclause affected.by.uncommenced="0" guid="_9281c1fc-6dc5-498f-aefe-f15a940048f4" id="sec.94-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">When the chief executive accredits a voluntary product stewardship scheme, the chief executive must register the scheme on a register of accredited product stewardship schemes kept in the department.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_64af5ead-cdec-4695-8c53-cfc13b82e977" id="sec.94-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive must ensure the register mentioned in <intref check="valid" refid="sec.94-ssec.1" target.guid="_9281c1fc-6dc5-498f-aefe-f15a940048f4">subsection (1)</intref> is kept as an accurate record of information about the accreditation and history of currently and previously accredited product stewardship schemes.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_03bca19c-4420-47cc-b26f-e4b8b55f9e1e" id="sec.94-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The register must be kept by the chief executive as a searchable, public register.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_87d3b9f3-936f-44c6-bfcf-0c8546950810" id="sec.95" provision.type="other" spent.amends="0"><no>95</no><heading guid="_444bbf02-acf3-4338-ac0b-7fba1d6e0f74" id="sec.95-he">Amendment of accredited product stewardship scheme</heading><subclause affected.by.uncommenced="0" guid="_46836ac2-8074-4d42-9c7a-f15b6b4ce9f9" id="sec.95-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The participants in an accredited product stewardship scheme may amend the scheme by agreement of all the participants.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b9107048-8cef-419f-a2bb-f37ad2cbad3c" id="sec.95-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The scheme manager for the scheme must advise the chief executive of the amendment within 10 business days after the amendment is made if the amendment is one of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_51cb063e-cd87-4691-a1ed-293ab29d539b" id="sec.95-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">adding to the participants in the scheme or removing any of the participants;</txt></block></li><li guid="_f2e9e13f-5ff6-49db-aef6-7a2272977969" id="sec.95-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">changing the scheme manager for the scheme;</txt></block></li><li guid="_22741670-530d-4a12-8887-615bdbec2fbf" id="sec.95-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">adding to the brands of the product that are the subject of the scheme.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_98e75189-6a2c-4582-8408-2d25732c1ff7" id="sec.95-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive must record, on the register of accredited product stewardship schemes, details of the amendment the chief executive considers appropriate.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b5699cb3-d3a8-411a-a5f9-35198ab9654e" id="sec.95-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">An amendment under <legref check="invalid" jurisd="QLD" refid="sec.95-ssec.1" type="act">subsection (1)</legref> must not include an amendment that will have an adverse effect on achieving the scheme’s objectives, including, for example, by affecting the ability of the scheme to meet its objectives within the time frames included in the scheme.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8e99806d-e0ce-4ded-8987-fb9e03d40a2a" id="sec.95-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0"><legref check="invalid" jurisd="QLD" refid="sec.95-ssec.4" type="act">Subsection (4)</legref> does not stop the accreditation of a new voluntary product stewardship scheme to replace an existing accredited scheme.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e0482bf5-4a41-485c-be76-d597c20bac1b" id="sec.96" provision.type="other" spent.amends="0"><no>96</no><heading guid="_0e0b43ea-624f-484b-8e4d-b3dab907f297" id="sec.96-he">Expiry of accredited product stewardship scheme</heading><subclause affected.by.uncommenced="0" guid="_4587cc7b-bd1e-4b95-a46c-710ca94091ee" id="sec.96-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The accreditation of an accredited product stewardship scheme expires on the earlier of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cb6b0b69-6a1a-44e4-93f5-42595228f726" id="sec.96-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the date stated in the scheme as the date the scheme ends;</txt></block></li><li guid="_f55e84c6-88be-4d94-a088-02290103c2f3" id="sec.96-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">5 years after the accreditation of the scheme.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ca5e060c-b66f-474b-88cb-70f7fe6bfde4" id="sec.96-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the accreditation of an accredited product stewardship scheme (<defterm guid="_5d3ac1c4-b51c-44cc-af78-bf799aad6094" id="sec.96-def.schemeA" type="definition">scheme A</defterm>) continues in force, as provided for in <intref check="valid" refid="sec.96-ssec.3" target.guid="_6387021c-8102-48e9-b7d3-c00b32612e87">subsection (3)</intref>, after the date (the <defterm guid="_6473218b-9165-425a-ad81-0fe62224155d" id="sec.96-def.expirydate" type="definition">expiry date</defterm>) it would otherwise end if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4aaff1f0-cb1c-43e6-93d8-f61655683101" id="sec.96-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the scheme manager for scheme A has, not later than 6 months before scheme A’s accreditation was due to end, applied to the chief executive for the accreditation of a new voluntary product stewardship scheme (<defterm guid="_5883ec2a-3753-40b6-82e5-e60ea7b4a152" id="sec.96-ssec.2-def.schemeB" type="definition">scheme B</defterm>) to replace scheme A; and</txt></block></li><li guid="_6d03f2aa-0f67-43f1-9837-ad0be59219e5" id="sec.96-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the chief executive has not decided, on or before the expiry date, whether scheme B should be accredited.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6387021c-8102-48e9-b7d3-c00b32612e87" id="sec.96-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Scheme A’s accreditation continues in force until—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a9bde995-4ff7-4875-a362-17f62aca9f38" id="sec.96-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the accreditation of scheme B takes effect, either in its form as first proposed or as subsequently changed in the application process; or</txt></block></li><li guid="_94381153-ffd0-4e2d-b135-c449209f06c9" id="sec.96-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the application process for scheme B’s accreditation has been completed, including, for example, the completion of any review about the chief executive’s decision on the proposed accreditation, and scheme B is not accredited.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d7fae76a-89f2-40e1-a138-c4789a9b2078" id="sec.97" provision.type="other" spent.amends="0"><no>97</no><heading guid="_0206b76b-1a05-4c6a-855d-c940230c8d8a" id="sec.97-he">Revocation of accreditation</heading><subclause affected.by.uncommenced="0" guid="_7647eb92-f25a-4c38-bbd6-702ca7e9de14" id="sec.97-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may revoke the accreditation of an accredited product stewardship scheme if the Minister is satisfied that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0c2b7a0d-53fd-47b5-b7b8-5dc29a19bd36" id="sec.97-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">any of the following apply—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ec31464a-b897-4a37-b399-53f4e91d0d2f" id="sec.97-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">reasonable steps are not being taken to implement the scheme;</txt></block></li><li guid="_da5cf4bf-d1e3-4d36-be85-915c6f253c36" id="sec.97-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the scheme’s objectives are not being met, or are unlikely to be met, within the time frames stated in the scheme;</txt></block></li><li guid="_fa059e4d-bc98-4462-beb1-e1d0b7c68850" id="sec.97-ssec.1-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the reporting requirements included in the scheme are not being complied with; or</txt></block></li></list></block></li><li guid="_e8070372-8729-44ea-973d-7a2a0c136068" id="sec.97-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the product the subject of the scheme was not a priority product when the scheme was accredited, but it has subsequently become a priority product and the objectives of the scheme are no longer adequate for the product.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2a28b385-6920-4443-b11a-5c8469d9cfea" id="sec.97-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Before revoking the accreditation of the product stewardship scheme, the Minister must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_60c9b561-194d-4668-8f4f-d166f5ae3c1f" id="sec.97-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">give notice to the scheme manager for the scheme advising of the proposed action; and</txt></block></li><li guid="_dcd35e7d-01cd-43ed-9f10-4bf5328fdf28" id="sec.97-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give the scheme manager a reasonable opportunity to make a submission to the Minister about the proposed revocation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_77129b8a-334b-412b-9590-ddd329a993e6" id="sec.97-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the Minister decides to revoke the accreditation, and the revocation is under <intref check="valid" refid="sec.97-ssec.1" target.guid="_7647eb92-f25a-4c38-bbd6-702ca7e9de14">subsection (1)</intref><intref check="valid" refid="sec.97-ssec.1-para1.a" target.guid="_0c2b7a0d-53fd-47b5-b7b8-5dc29a19bd36">(a)</intref>, the Minister must give the scheme manager for the scheme an information notice for the decision to revoke the accreditation.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_a7aa3506-9b72-4125-ae5c-8d7532718575" id="ch.4-pt.3-div.3"><no>Division 3</no><heading guid="_8ef57a46-a610-4dbf-a64a-eff7f804636f" id="ch.4-pt.3-div.3-he">Product stewardship schemes by regulation</heading><clause affected.by.uncommenced="0" guid="_0d2b5a5b-b2f4-49ea-90d6-5809faf8df54" id="sec.98" provision.type="other" spent.amends="0"><no>98</no><heading guid="_085230a0-8e02-4fdb-8011-72b30ff8cb69" id="sec.98-he">Regulation about product stewardship</heading><subclause affected.by.uncommenced="0" guid="_a013ad39-9355-4e91-8739-df00ee1f655e" id="sec.98-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A regulation—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f72aa6f1-c073-4e28-bec4-35aa9d8b1917" id="sec.98-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">may provide for the implementation and operation of a regulated product stewardship scheme for a priority product; or</txt></block></li><li guid="_31f8e6e1-486e-4e77-b8c0-698b9a787aea" id="sec.98-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">may include provisions to facilitate the accreditation of a proposed voluntary product stewardship scheme, or the implementation and operation of an accredited product stewardship scheme or an approved program.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6dfd0fd6-492c-4035-8b7e-a3c32626a4cd" id="sec.98-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.98-ssec.1" target.guid="_a013ad39-9355-4e91-8739-df00ee1f655e">subsection (1)</intref>, the regulation may include any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6bdc6b8d-2ef9-45c2-bfa3-b10466c39a15" id="sec.98-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the expected waste minimisation, treatment or disposal targets for the product the subject of the scheme or program and the required times for meeting the targets;</txt></block></li><li guid="_f38c38b9-4b19-478e-a5d9-f001c9074913" id="sec.98-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">reporting and information requirements, including information to be provided to purchasers, users and handlers of the product the subject of the scheme or program;</txt></block></li><li guid="_b82be28e-7268-40bc-9e6b-fc2d005a7724" id="sec.98-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the regulation provides for the implementation and operation of a regulated product stewardship scheme—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6a14ed09-ac9d-4f78-8a63-b02176872f4a" id="sec.98-ssec.2-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the scheme manager for the scheme and the obligations of the scheme manager; and</txt></block></li><li guid="_87cc604e-9ac7-49ad-a294-ab0271843803" id="sec.98-ssec.2-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the duration of the scheme;</txt></block></li></list></block></li><li guid="_547e15e7-6d68-498e-ad1e-b9cfa9eca45a" id="sec.98-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">if the regulation applies to a voluntary product stewardship scheme intended to be, but not yet, accredited—the period within which the application for accreditation is required to be made;</txt></block></li><li guid="_eba6b8d1-db38-49be-9f12-1078d756d502" id="sec.98-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the period within which any person is required to commence complying with any of the requirements or duties imposed on the person under the regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c68d9e03-6bd8-4061-834b-7ab3da964bdb" id="sec.98-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister must not recommend to the Governor in Council the making of a regulation under <intref check="valid" refid="sec.98-ssec.1" target.guid="_a013ad39-9355-4e91-8739-df00ee1f655e">subsection (1)</intref><intref check="valid" refid="sec.98-ssec.1-para1.a" target.guid="_f72aa6f1-c073-4e28-bec4-35aa9d8b1917">(a)</intref> for a priority product if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_15653990-9223-4116-9147-9db94de5d5e1" id="sec.98-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">there is currently an accredited product stewardship scheme for the product and it is expected that the scheme will still be in force after the regulation commences; or</txt></block></li><li guid="_b8832b7e-82c8-461f-a164-7e1636bc6a51" id="sec.98-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the time limit, as stated in a scheme invitation in the priority statement as currently in force, for the submission for accreditation of a voluntary product stewardship scheme for the product has not yet elapsed.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_79c7d8b6-ab54-40ce-949b-e9c84d31f966" id="sec.98-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The Minister may recommend to the Governor in Council the making of a regulation under <intref check="valid" refid="sec.98-ssec.1" target.guid="_a013ad39-9355-4e91-8739-df00ee1f655e">subsection (1)</intref><intref check="valid" refid="sec.98-ssec.1-para1.a" target.guid="_f72aa6f1-c073-4e28-bec4-35aa9d8b1917">(a)</intref> for a priority product only after considering the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9a9f0222-5c0f-4a2b-9ee0-a3a440ba2939" id="sec.98-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">whether an approved program is in existence for the product and whether the program is being appropriately implemented;</txt></block></li><li guid="_48136d3a-bc36-4a8e-9565-0eb65fb2c99f" id="sec.98-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether economic analysis supports the implementation of the proposed regulated product stewardship scheme;</txt></block></li><li guid="_b11b62a9-cf0b-4561-ac76-e49ff6fec29e" id="sec.98-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">whether there are any constitutional or other impediments to the State’s acting unilaterally in implementing a product stewardship scheme for the product.</txt></block></li></list></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_18031591-da7c-4f42-88e7-4ea46c3fd26c" id="ch.4-pt.3-div.4"><no>Division 4</no><heading guid="_fb538a18-64e1-43a6-a8e9-25e1ea1d9c0f" id="ch.4-pt.3-div.4-he">Monitoring of schemes</heading><clause affected.by.uncommenced="0" guid="_09b81876-a9c3-42b0-8439-cb3204d414f1" id="sec.99" provision.type="other" spent.amends="0"><no>99</no><heading guid="_ba417812-3975-4443-9b42-51876c3694ef" id="sec.99-he">Monitoring of particular product stewardship scheme</heading><subclause affected.by.uncommenced="0" guid="_57d5af72-7d5f-4526-bc03-a64cc9348cbb" id="sec.99-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may at any time conduct monitoring of the performance of an accredited or regulated product stewardship scheme.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_432f1bb8-ac08-400c-ba5e-01a39d4f2da8" id="sec.99-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The monitoring may have regard especially to the stated targets and objectives of the scheme.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a639e0fd-9829-4c4c-ba96-f1f3cc63ddb2" id="sec.99-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If asked to do so by the chief executive, the scheme manager under a regulated product stewardship scheme must reimburse the chief executive for some or all of the expenses reasonably incurred by the department in the conduct of the monitoring.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6e5d2888-9d2f-4454-8816-971cb0b60258" id="sec.99-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">An amount payable under <intref check="valid" refid="sec.99-ssec.3" target.guid="_a639e0fd-9829-4c4c-ba96-f1f3cc63ddb2">subsection (3)</intref> may be recovered as a debt payable by the scheme manager to the chief executive.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_45a46bfa-f92b-49b2-ab38-f707489d93a7" id="ch.4-pt.3A"><no>Part 3A</no><heading guid="_9968c931-ea2d-49d8-83d8-f6380fb68892" id="ch.4-pt.3A-he">Banned plastic shopping bags</heading><clause affected.by.uncommenced="0" guid="_bc32c628-f511-41c5-b9d1-570dc54c007c" id="sec.99A" provision.type="other" spent.amends="0"><no>99A </no><heading guid="_c1be0391-fa29-470e-8be4-0767f2383aee" id="sec.99A-he">Objects of part</heading><block><txt break.before="1">The objects of this part are to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_227595aa-1859-4f88-9c58-40e976294f52" id="sec.99A-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">reduce plastic pollution by reducing the number of plastic bags that become waste and enter the environment as litter; and</txt></block></li><li guid="_7bff8b84-44e5-4ddd-90db-fb545c0609a9" id="sec.99A-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">encourage retailers and consumers to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_93710a62-30c7-4798-88aa-3c7c0eb09bbb" id="sec.99A-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">reduce the overall use of carry bags by considering whether it is necessary on every occasion to use a bag to carry goods; and</txt></block></li><li guid="_ceb86aef-62a6-4d6e-a3e9-83535e8be101" id="sec.99A-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">use alternative shopping bags.</txt></block></li></list></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_b670feba-5739-4c23-a2dd-3efd56ae3be0" id="sec.99B" provision.type="other" spent.amends="0"><no>99B </no><heading guid="_35a43cd3-5a9f-4867-a1b8-70e5bced3926" id="sec.99B-he">Meaning of <defterm guid="_5846101f-d25e-4e68-9cfb-1420c6d6421f" type="mention">banned plastic shopping bag</defterm> and <defterm guid="_54057a5d-4802-44d6-9812-56bb145a5a45" type="mention">alternative shopping bag</defterm></heading><subclause affected.by.uncommenced="0" guid="_bbc1f641-b747-4935-9247-9a9eedd796cf" id="sec.99B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A <defterm guid="_bafc6f39-81c3-479e-8ccc-fabc2da1047e" id="sec.99B-def.bannedplasticshoppingbag-oc.2" type="definition">banned plastic shopping bag</defterm> is a carry bag with handles—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_56cd1932-fde6-490e-88ec-f54523361b96" id="sec.99B-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">made, in whole or part, of plastic (whether or not the plastic is degradable) that has a thickness of less than—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5a4a92dc-7ba4-4797-a95d-89da9d94b192" id="sec.99B-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the thickness prescribed by regulation; or</txt></block></li><li guid="_39be9e01-3d02-4d73-a938-d6f467f38951" id="sec.99B-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if a thickness has not been prescribed by regulation—35 microns; or</txt></block></li></list></block></li><li guid="_b66485ef-23c9-4452-af0f-f318f4bbf6d7" id="sec.99B-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">prescribed by regulation to be a banned plastic shopping bag.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d9bc315b-cf04-4217-8493-26481132746c" id="sec.99B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, each of the following is not a banned plastic shopping bag—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_29223b31-91eb-4f55-bcfa-b420a4464efe" id="sec.99B-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a barrier bag;</txt></block></li><li guid="_f0a8a34f-f18d-4816-b8c3-657800b8797f" id="sec.99B-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a plastic bag that is, or is an integral part of, the packaging in which goods are sealed for sale;</txt></block></li><li guid="_e01aa6bc-30bc-4411-9cc3-8b4bdf6746e2" id="sec.99B-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a bag that is prescribed by regulation to not be a banned plastic shopping bag.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8de67671-d51e-4b72-98f4-68a769cec1fd" id="sec.99B-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">An <defterm guid="_3735ebc6-e52b-496e-82ac-e2e0604900e7" id="sec.99B-def.alternativeshoppingbag-oc.2" type="definition">alternative shopping bag</defterm> is a bag, other than a banned plastic shopping bag, that is suitable to be used to carry goods from a retailer’s premises.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3816e0ae-cde6-4a4a-b344-2c2e32181acf" id="sec.99B-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_579d318a-03d0-45b8-828d-2145d95bf89c" id="sec.99B-ssec.4-def.AS4736_"><txt break.before="1"><defterm guid="_c6c5f3e5-1de2-49fb-b83f-bc2abd917b69" id="sec.99B-ssec.4-def.AS4736" type="definition">AS 4736</defterm> means the Australian Standard for biodegradable plastics suitable for composting and other microbial treatment, as in force from time to time under that designation (regardless of the edition or year of publication of the standard).</txt></definition><definition affected.by.uncommenced="0" guid="_b9588a02-9454-4f55-9f84-df68b1cf1119" id="sec.99B-ssec.4-def.barrierbag_"><txt break.before="1"><defterm guid="_f3ee1ee6-5c43-4c59-90cf-afa63b9b40bf" id="sec.99B-ssec.4-def.barrierbag" type="definition">barrier bag</defterm> means a plastic bag used to carry unpackaged perishable food.</txt><note guid="_8c427d2b-f3ce-4119-af44-4a7c875f83bb" id="sec.99B-ssec.4-def.barrierbag-note" type="example"><heading guid="_e22637bd-21b1-498f-823b-2994205f1f87" id="sec.99B-ssec.4-def.barrierbag-note-he">Examples of unpackaged perishable foods—</heading><block><txt break.before="1">fruit, vegetables, meat, fish</txt></block></note></definition><definition affected.by.uncommenced="0" guid="_2f637146-d87e-4248-8805-69647b212f73" id="sec.99B-ssec.4-def.degradable_"><txt break.before="1"><defterm guid="_f0907afd-f126-43c0-9341-ca73353d233e" id="sec.99B-ssec.4-def.degradable" type="definition">degradable</defterm>, for plastic, means plastic that is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3639e140-9de1-446b-b8a2-368fe3e8c774" id="sec.99B-ssec.4-def.degradable-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">biodegradable, including material that is compostable under AS 4736; or</txt></block></li><li guid="_3fd64caf-3f65-4259-8514-f29995ffb630" id="sec.99B-ssec.4-def.degradable-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">designed to degrade and break into fragments over time.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_07f9335b-61ac-4df1-a685-76f7f4e849f1" id="sec.99C" provision.type="other" spent.amends="0"><no>99C </no><heading guid="_b3b8c608-e950-41e5-afe1-0a4ff01a721b" id="sec.99C-he">Meaning of <defterm guid="_db3a491e-75f1-4ec9-a15e-ce7061e9c6a4" type="mention">retailer</defterm></heading><block><txt break.before="1">A <defterm guid="_c94d1072-3494-4335-93cb-718ecbaf39c7" id="def.retailer" type="definition">retailer</defterm> is a person who sells goods in trade or commerce.</txt></block></clause><clause affected.by.uncommenced="0" guid="_d38f3192-5dd0-4b32-be15-e0e2e7a01933" id="sec.99D" provision.type="other" spent.amends="0"><no>99D </no><heading guid="_28d96dc0-fe40-4f10-97c2-992733bfd019" id="sec.99D-he">Retailer not to give banned plastic shopping bag</heading><subclause affected.by.uncommenced="0" guid="_98d4988e-da10-47d2-90a2-1af8a4fa3423" id="sec.99D-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A retailer must not give a banned plastic shopping bag to a person to use to carry goods the retailer sells from the retailer’s premises.</txt><penalty guid="_4272ca5a-64b4-4d1d-acc3-6ab42a52e3d2" id="sec.99D-ssec.1-pen"><block><txt break.before="1">Maximum penalty—50 penalty units.</txt></block></penalty></block></subclause><subclause affected.by.uncommenced="0" guid="_39948537-6737-4a0d-b650-266fb0aca279" id="sec.99D-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">This section applies whether or not a price is charged for the banned plastic shopping bag.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_9d446b61-4c54-4973-bf8c-807d05ca7b26" id="sec.99E" provision.type="other" spent.amends="0"><no>99E </no><heading guid="_5cef1de5-8439-42ad-9978-6bea27a2440c" id="sec.99E-he">Giving false or misleading information about banned plastic shopping bag</heading><block><txt break.before="1">A person must not give information that the person knows is false or misleading to another person about—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3c6585e4-66b2-461c-825b-655605ce0786" id="sec.99E-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the composition of a banned plastic shopping bag; or</txt></block></li><li guid="_8b8d8136-b933-4f55-bc51-142c4cb7947e" id="sec.99E-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether or not a plastic bag is a banned plastic shopping bag.</txt></block></li></list><penalty guid="_88486a0a-48b3-4ebd-af00-3baad343530e" id="sec.99E-pen"><block><txt break.before="1">Maximum penalty—50 penalty units.</txt></block></penalty></block></clause><clause affected.by.uncommenced="0" guid="_f1eaf073-3f32-449f-ae17-70b402938855" id="sec.99F" provision.type="other" spent.amends="0"><no>99F </no><heading guid="_a82e227d-6f69-421f-9a5b-c531f6c77beb" id="sec.99F-he">Retailer may charge for alternative shopping bag</heading><block><txt break.before="1">Nothing in this part prevents a retailer from charging for an alternative shopping bag.</txt></block></clause><clause affected.by.uncommenced="0" guid="_2c180922-6c7c-49f5-b440-0fd1f15bbb62" id="sec.99G" provision.type="other" spent.amends="0"><no>99G </no><heading guid="_56e9e4b4-803b-4fc9-8020-019a23d02a14" id="sec.99G-he">Review of part</heading><subclause affected.by.uncommenced="0" guid="_705800d1-9554-4a20-8a65-d4a11f042a0f" id="sec.99G-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister must ensure a review of the operation of this part starts as soon as practicable, but no more than 3 months, after 1 July 2020.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ce71fe06-31d1-4473-826e-2fccb568bdb2" id="sec.99G-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The review must include a review of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_af3a62f1-9a78-4079-841f-f354be5ae88f" id="sec.99G-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the effect of this part on the community and retailers; and</txt></block></li><li guid="_ded3672d-143d-42ce-9065-3ef782fd6be2" id="sec.99G-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the level of retailers’ knowledge and understanding about the prohibition on giving banned plastic shopping bags to persons; and</txt></block></li><li guid="_73a3ce0f-6183-4338-9710-4291ab24643f" id="sec.99G-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the effectiveness of this part in reducing the quantity of banned plastic shopping bags—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_580cb2a6-6afb-4547-9e5f-fa13be9a8f19" id="sec.99G-ssec.2-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">used; and</txt></block></li><li guid="_ff20002e-91b3-4853-bd5d-ccb57171b1a6" id="sec.99G-ssec.2-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">that becomes waste and is littered or disposed of to landfill.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_553af1fd-e35d-4e6e-98c8-9745ad5e0bc0" id="sec.99G-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive must give a report on the outcome of the review to the Minister within 6 months after the day the review starts.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b74bb6fa-3a22-42bf-959c-198506a79cea" id="sec.99G-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The Minister must table the report in the Legislative Assembly within 12 sitting days after receiving the report.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_d47b5921-d5b9-48e4-b9d8-cc98f57b85b6" id="ch.4-pt.3AA"><no>Part 3AA</no><heading guid="_bc350c38-48bb-46e2-a346-ca40fc204ef3" id="ch.4-pt.3AA-he">Plastic items</heading><division affected.by.uncommenced="0" guid="_50cc1d3e-085b-49bb-b7eb-d651a485b0d9" id="ch.4-pt.3AA-div.1"><no>Division 1</no><heading guid="_bbbbac28-1079-4904-bc01-262e09bc1b0f" id="ch.4-pt.3AA-div.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_2cf8efb5-6dbe-4781-b40f-da4c88432123" id="sec.99GA" provision.type="other" spent.amends="0"><no>99GA </no><heading guid="_1b4f3d10-7f09-4a5f-aca1-00c42def9970" id="sec.99GA-he">Objects of part</heading><block><txt break.before="1">The objects of this part are to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7f91bf82-122d-48f7-8440-f261659bf1d6" id="sec.99GA-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">promote and support the waste and resource management hierarchy; and</txt></block></li><li guid="_38bbf758-126f-4959-b5a0-ac1c9a50c18c" id="sec.99GA-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">reduce plastic pollution by reducing the number of single-use plastic items—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8806f80f-c9c9-427b-a573-3577cd3e3ac2" id="sec.99GA-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">used or sold; and</txt></block></li><li guid="_a91370b6-aa0e-48a5-b3b3-7603e5a4ca8c" id="sec.99GA-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">that become waste and are littered or disposed of to landfill; and</txt></block></li></list></block></li><li guid="_7a8537ed-dd1c-42a0-b371-d214acd6fda6" id="sec.99GA-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">encourage retailers and consumers to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_014c9c15-586a-4136-a623-0fa5430a71c7" id="sec.99GA-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">reduce the overall use and sale of single-use plastic items; and</txt></block></li><li guid="_85990c6f-7796-456d-b84f-d41dd5ad611e" id="sec.99GA-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">use or sell sustainable alternatives to single-use plastic items; and</txt></block></li></list></block></li><li guid="_0a88f632-12ca-4965-8a9d-65e32a463843" id="sec.99GA-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">encourage manufacturers to identify innovative product designs for sustainable alternatives to single-use plastic items; and</txt></block></li><li guid="_81ce5c86-8cb7-458b-8b75-d183ece695e0" id="sec.99GA-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">recognise the needs of persons with a disability and the healthcare needs of persons in relation to the use of banned single-use plastic items; and</txt></block></li><li guid="_897ae6ab-4d1c-4c8c-af47-de557f7b77aa" id="sec.99GA-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">ensure manufacturers and consumers are aware of, and understand, information about plastic items that are compostable.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_0dfe0f1a-b4d7-4e17-914d-6addd68ca009" id="sec.99GB" provision.type="other" spent.amends="0"><no>99GB </no><heading guid="_3f220234-104d-4de3-9d76-0ce992bd0ebb" id="sec.99GB-he">Definitions for part</heading><block><txt break.before="1">In this part—</txt><deflist><definition affected.by.uncommenced="0" guid="_f03c7482-8d75-4a32-a099-83ef595d1411" id="sec.99GB-def.AS4736_"><txt break.before="1"><defterm guid="_d2d18cc8-9eb7-4c3d-b958-0a310365426c" id="sec.99GB-def.AS4736" type="definition">AS 4736</defterm> means the Australian Standard for biodegradable plastics suitable for composting and other microbial treatment, as in force from time to time under that designation (regardless of the edition or year of publication of the standard).</txt></definition><definition affected.by.uncommenced="0" guid="_d9719518-b47f-4a2e-99dd-c4152f04c668" id="sec.99GB-def.AS5810_"><txt break.before="1"><defterm guid="_4a2dd10a-f5f6-4831-bf18-2ce15e62aed8" id="sec.99GB-def.AS5810" type="definition">AS 5810</defterm> means the Australian Standard for biodegradable plastics suitable for home composting, as in force from time to time under that designation (regardless of the edition or year of publication of the standard).</txt></definition><definition affected.by.uncommenced="0" guid="_6cc35e08-0f64-452f-8a0d-b145861ce75c" id="sec.99GB-def.bannedsingleuseplasticitem_"><txt break.before="1"><defterm guid="_db5d62cb-f618-41ff-99ca-5560996144e2" id="sec.99GB-def.bannedsingleuseplasticitem" type="definition">banned single-use plastic item</defterm> see section 99GC.</txt></definition><definition affected.by.uncommenced="0" guid="_f7f92ea0-b610-4d97-948f-8c3548916304" id="sec.99GB-def.compostable_"><txt break.before="1"><defterm guid="_1d19e863-e2de-4afc-ba39-14eb668dd3eb" id="sec.99GB-def.compostable" type="definition">compostable</defterm>, for a plastic item, means the plastic item is compostable under AS 4736 or AS 5810.</txt></definition><definition affected.by.uncommenced="0" guid="_e7a006d7-154d-4c45-b176-387c1c4a7301" id="sec.99GB-def.plasticitem_"><txt break.before="1"><defterm guid="_1c039528-6db9-4de9-9a37-617448209149" id="sec.99GB-def.plasticitem" type="definition">plastic item</defterm> means an item made, in whole or part, of plastic (whether or not the plastic is compostable).</txt></definition><definition affected.by.uncommenced="0" guid="_eccdb90f-e1ea-4325-afe6-89d673069c3e" id="sec.99GB-def.singleuseplasticitem_"><txt break.before="1"><defterm guid="_9fc023c1-f27b-4eb2-9339-a96c4092cc11" id="sec.99GB-def.singleuseplasticitem" type="definition">single-use plastic item</defterm> means a plastic item, other than a plastic item that is compostable, designed to be used only once.</txt></definition></deflist></block></clause><clause affected.by.uncommenced="0" guid="_9bf654b4-c0a4-4235-92d3-7ad91e6bf77c" id="sec.99GC" provision.type="other" spent.amends="0"><no>99GC </no><heading guid="_29b2bce0-70b1-4493-a385-a628c8b1b4fa" id="sec.99GC-he">Meaning of <defterm guid="_dd2c1492-4e92-454a-a756-cb73bdaa2a3b" type="mention">banned single-use plastic item</defterm></heading><subclause affected.by.uncommenced="0" guid="_58287bdc-1516-4d5a-9c08-60a90b2d3cd3" id="sec.99GC-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A <defterm guid="_b20ef418-93e9-47b2-8456-6c23f4053233" id="sec.99GC-def.bannedsingleuseplasticitem-oc.2" type="definition">banned single-use plastic item</defterm> is a single-use plastic item that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8dc5ac95-e209-4f6b-b3df-14b1315b8af5" id="sec.99GC-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3341ead4-56f3-4a30-b8d8-185cd10b575a" id="sec.99GC-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a plate; or</txt></block></li><li guid="_6498f51a-1350-4890-abab-9c722459986d" id="sec.99GC-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a bowl; or</txt></block></li><li guid="_7d5e7dbb-3bdd-4141-83e7-f7f34c275850" id="sec.99GC-ssec.1-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">an item of cutlery; or</txt></block></li><li guid="_f4a66b8e-4641-426c-bbf0-11f5d8cf29e6" id="sec.99GC-ssec.1-para1.a-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">a straw; or</txt></block></li><li guid="_f7e799ce-1edd-4832-8fcc-4b92d99eebe2" id="sec.99GC-ssec.1-para1.a-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">a stirrer; or</txt></block></li><li guid="_8fbc4828-5a82-403b-896a-7edca68ba32e" id="sec.99GC-ssec.1-para1.a-para2.vi" provision.type="other"><no>(vi)</no><block><txt break.before="0">a takeaway food container made, in whole or part, of expanded polystyrene (EPS); or</txt></block></li><li guid="_ddcddaef-6c0b-45f7-9be6-ddafe0232a95" id="sec.99GC-ssec.1-para1.a-para2.vii" provision.type="other"><no>(vii)</no><block><txt break.before="0">a cup made, in whole or part, of expanded polystyrene (EPS); or</txt></block></li></list></block></li><li guid="_131bb7c7-d47a-4650-9dc6-a1821dfceaa7" id="sec.99GC-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is prescribed by regulation to be a banned single-use plastic item.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" change="insReplace" guid="_659e24b1-c40b-4395-afad-88c272624b5d" id="sec.99GC-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, a single-use plastic item that is prescribed by regulation not to be a banned single-use plastic item is not a banned single-use plastic item.</txt></block></subclause><subclause affected.by.uncommenced="0" change="ins" guid="_ecbe0d79-d2b1-4337-93b7-6f9d1a2f1495" id="sec.99GC-ssec.2A" provision.type="other"><no>(2A)</no><block><txt break.before="0">Also, a single-use plastic item that is an integral part of a shelf-ready product is not a banned single-use plastic item.</txt><note guid="_ab384f38-8d20-4e90-ae46-fed79bfcfc1d" id="sec.99GC-ssec.2A-note" type="example"><heading guid="_5871fb03-23ca-4ebb-bb8a-d1a87fa37c10" id="sec.99GC-ssec.2A-note-he">Examples—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_ecf7132e-8eda-46d7-bdac-4832b26fbb97" id="sec.99GC-ssec.2A-note-para1" provision.type="other"><no>•</no><block><txt break.before="0">a straw attached to a juice box</txt></block></li><li guid="_f259c91d-ecc4-4f65-b8be-8559be50a1a8" id="sec.99GC-ssec.2A-note-para1-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">a fork included in a pre-packed salad</txt></block></li><li guid="_cc2c90da-f958-442f-8c75-325c833f6c61" id="sec.99GC-ssec.2A-note-para1-oc.3" provision.type="other"><no>•</no><block><txt break.before="0">a spoon attached to a yoghurt container</txt></block></li><li guid="_b8d4d072-6c3d-4f5e-b193-088cca0eaef5" id="sec.99GC-ssec.2A-note-para1-oc.4" provision.type="other"><no>•</no><block><txt break.before="0">a plate forming part of a frozen meal</txt></block></li></list></block></note></block></subclause><subclause affected.by.uncommenced="0" change="delReplace" guid="_567f670c-342d-4ca5-a9a8-d830816f4e48-del" id="sec.99GC-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">However, each of the following is not a banned single-use plastic item—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dc9cf370-f4e4-4eed-92cc-ec340f79cbbd-del" id="sec.99GC-ssec.2-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">a single-use plastic item that is an integral part of a shelf-ready product;</txt><note guid="_2c3395e1-48d5-4aef-9a62-932c780a9921-del" id="sec.99GC-ssec.2-para1.a-note-del" type="example"><heading guid="_28b8dc87-593a-4b1e-9508-fb43ac1331ec-del" id="sec.99GC-ssec.2-para1.a-note-he-del">Examples—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_138ee7cc-e1e5-4874-ad6f-40f7a19f38aa-del" id="sec.99GC-ssec.2-para1.a-note-para2-del" provision.type="other"><no>•</no><block><txt break.before="0">a straw attached to a juice box</txt></block></li><li guid="_c4028d9b-b358-4db0-9536-5a0ff273b9c3-del" id="sec.99GC-ssec.2-para1.a-note-para2-oc.2-del" provision.type="other"><no>•</no><block><txt break.before="0">a fork included in a pre-packed salad</txt></block></li><li guid="_96863e3e-3b3e-4432-a1d2-efb12c4b1032-del" id="sec.99GC-ssec.2-para1.a-note-para2-oc.3-del" provision.type="other"><no>•</no><block><txt break.before="0">a spoon attached to a yoghurt container</txt></block></li><li guid="_444ebea7-558c-4d72-8253-6b099ef3a5f4-del" id="sec.99GC-ssec.2-para1.a-note-para2-oc.4-del" provision.type="other"><no>•</no><block><txt break.before="0">a plate forming part of a frozen meal</txt></block></li></list></block></note></block></li><li guid="_6605d6fa-efed-47bb-9207-84cb5e44051e-del" id="sec.99GC-ssec.2-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">a single-use plastic item that is prescribed by regulation not to be a banned single-use plastic item.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2e4e09f2-84ca-4a95-a502-430908be79d4" id="sec.99GC-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister may recommend to the Governor in Council the making of a regulation under subsection (1)(b) or (2)<del xml:space="preserve"><intref check="valid" refid="sec.99GC-ssec.2-para1.b" target.guid="_6605d6fa-efed-47bb-9207-84cb5e44051e">(b)</intref></del> about whether or not a single-use plastic item is a banned single-use plastic item (a <defterm guid="_a0fe356c-d6f8-42b5-b95e-ddd8cde02c5f" id="sec.99GC-def.proposedchange" type="definition">proposed change</defterm>) only after—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6fbd2bbc-680e-45d5-b47d-e25fc12ca6f9" id="sec.99GC-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">carrying out consultation with the public about the proposed change; and</txt></block></li><li guid="_d0116e29-70ad-47c0-9324-c75a726aa727" id="sec.99GC-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">considering all of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_78231c67-bdeb-402d-afea-cbd94f418b49" id="sec.99GC-ssec.3-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the results of the public consultation about the proposed change;</txt></block></li><li guid="_21dfa95d-9d3d-4317-8957-84750df9e33f" id="sec.99GC-ssec.3-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">whether making the proposed change is likely to achieve the objects of this part;</txt></block></li><li guid="_36a7028f-4297-4705-b38c-6553065cc79d" id="sec.99GC-ssec.3-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">whether voluntary or other measures to achieve the objects of this part have been shown not to be effective;</txt></block></li><li guid="_4ea55b08-7697-4ec9-b6db-41da2e45311a" id="sec.99GC-ssec.3-para1.b-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">if the proposed change is to prescribe a single-use plastic item to be a banned single-use plastic item—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_28593ce4-b6ca-41a0-a935-564a401eb548" id="sec.99GC-ssec.3-para1.b-para2.iv-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">the availability of alternative products to the single-use plastic item; and</txt></block></li><li guid="_e9827b19-8efd-405c-8b55-7346dcd0d5f4" id="sec.99GC-ssec.3-para1.b-para2.iv-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">whether the costs of monitoring, enforcement and market development are proportional to the benefits of the proposed change.</txt></block></li></list></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" change="ins" guid="_8d6ccbb0-c0a7-469d-ad3c-406064a67a52" id="sec.99GC-ssec.3A" provision.type="other"><no>(3A)</no><block><txt break.before="0">The following provisions expire on 31 December 2025—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_788589f3-8b8f-40a4-92f1-4b398b9b376a" id="sec.99GC-ssec.3A-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">this subsection;</txt></block></li><li guid="_597e1f38-d5a6-467c-9937-4dc3b58ea1e6" id="sec.99GC-ssec.3A-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">subsection (2A);</txt></block></li><li guid="_df6cec35-3114-4635-92cb-db01a031a244" id="sec.99GC-ssec.3A-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">subsection (4), definition <defterm guid="_283e4965-d0ee-4df1-870c-71a49df3faf6" type="mention">shelf-ready product</defterm>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_96ea28b8-d9ce-4ae6-aaec-5f85b99ebedb" id="sec.99GC-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_2017f722-7fdf-4b62-8d40-6e28997faa3d" id="sec.99GC-ssec.4-def.cutlery_"><txt break.before="1"><defterm guid="_1fc76550-03d9-4cd8-ac41-8eb8a9203b8f" id="sec.99GC-ssec.4-def.cutlery" type="definition">cutlery</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_14a83ff2-bf7a-4404-b6cc-feecd638c505" id="sec.99GC-ssec.4-def.cutlery-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">means utensils for eating food; and</txt></block></li><li guid="_bae55f3b-b4cc-454c-9c49-b87fc8ea885e" id="sec.99GC-ssec.4-def.cutlery-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">includes chopsticks, splayds and sporks.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_0e44383d-3e0a-492e-aa93-ddc0a7bb042d" id="sec.99GC-ssec.4-def.shelfreadyproduct_"><txt break.before="1"><defterm guid="_c10be8b7-1028-42ef-a448-7401dd45fa66" id="sec.99GC-ssec.4-def.shelfreadyproduct" type="definition">shelf-ready product</defterm> means food or a beverage that is pre-packed as a single serve and ready for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3a0fdf80-1bd3-4686-9a8e-aa4e4eb32e01" id="sec.99GC-ssec.4-def.shelfreadyproduct-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">immediate consumption; or</txt></block></li><li guid="_014592fe-0a00-424d-ae49-6b0a57a95f42" id="sec.99GC-ssec.4-def.shelfreadyproduct-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">consumption after cooling or heating the food or beverage.</txt></block></li></list></definition></deflist></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_553881c3-5fc3-40ec-912f-181787772006" id="ch.4-pt.3AA-div.2"><no>Division 2</no><heading guid="_871bfa13-4359-4f52-8968-54fd972d59c1" id="ch.4-pt.3AA-div.2-he">Banned single-use plastic items</heading><clause affected.by.uncommenced="0" guid="_dc11cbff-a534-4444-a30b-0c86773ab81c" id="sec.99GD" provision.type="other" spent.amends="0"><no>99GD </no><heading guid="_6eea31d1-652c-4abe-90ef-308ec1d5d1a5" id="sec.99GD-he">Restriction on sale of banned single-use plastic items</heading><subclause affected.by.uncommenced="0" guid="_c7b2c3ac-49f7-4e52-9e62-e8742e4b3755" id="sec.99GD-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person who conducts a business or undertaking must not, in the course of conducting the business or undertaking, sell a banned single-use plastic item to another person.</txt><penalty guid="_7585199b-2c35-409f-9c75-8d4c88829da0" id="sec.99GD-ssec.1-pen"><block><txt break.before="1">Maximum penalty—50 penalty units.</txt></block></penalty></block></subclause><subclause affected.by.uncommenced="0" guid="_833e6e2e-9c06-4717-9290-a2a5db940de3" id="sec.99GD-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, subsection (1) does not apply to the sale of a banned single-use plastic item—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0fdd0480-51d3-4024-9974-0181482ab1a5" id="sec.99GD-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">by or to a person who conducts an exempt business or undertaking; or</txt></block></li><li guid="_2db4501a-e9d7-48ab-8325-934a66d7aca2" id="sec.99GD-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the person selling the item reasonably believes the sale is a step in a supply chain for the supply of the item to a person who conducts an exempt business or undertaking.</txt><note guid="_0f352e8e-93d1-4fee-a4c2-005e8e82ef7a" id="sec.99GD-ssec.2-para1.b-note" type="example"><heading guid="_4808363c-22ca-4bf6-9774-49595ac15da1" id="sec.99GD-ssec.2-para1.b-note-he">Example for paragraph (b)—</heading><block><txt break.before="1">A manufacturer may sell plastic straws to a distributor if the manufacturer reasonably believes the sale of the straws is a step in a supply chain for the supply of the straws to a pharmacy.</txt></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0b9bcd55-9bab-4b87-87c7-0394f05e046c" id="sec.99GD-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_eff10b72-9c27-4ac6-912f-9e544c8fac68" id="sec.99GD-ssec.3-def.exemptbusinessorundertaking_"><txt break.before="1"><defterm guid="_fda6a6f3-9604-4a15-a311-393f425ed0a1" id="sec.99GD-ssec.3-def.exemptbusinessorundertaking" type="definition">exempt business or undertaking</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8cf2c78b-0fe3-434f-9d46-02b9606c7d7f" id="sec.99GD-ssec.3-def.exemptbusinessorundertaking-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a healthcare business or undertaking; or</txt></block></li><li guid="_e21fd8a4-ee37-4c65-a6c5-9b46e455f343" id="sec.99GD-ssec.3-def.exemptbusinessorundertaking-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a school; or</txt></block></li><li guid="_3ad561d6-139a-4034-880b-b96f757c9336" id="sec.99GD-ssec.3-def.exemptbusinessorundertaking-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a business or undertaking, prescribed by regulation for this definition, that involves the sale or supply of banned single-use plastic items for use by persons with a disability or healthcare needs.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_7916faca-fbf1-4eb9-9d01-82920a7b301b" id="sec.99GD-ssec.3-def.healthcarebusinessorundertaking_"><txt break.before="1"><defterm guid="_a97dc59d-c279-453d-b098-9409532cd124" id="sec.99GD-ssec.3-def.healthcarebusinessorundertaking" type="definition">healthcare business or undertaking</defterm> means any of the following businesses or undertakings (however called)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_95b8b0f4-6d2c-4283-9f8b-0546f464f862" id="sec.99GD-ssec.3-def.healthcarebusinessorundertaking-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a clinic or facility that provides care to persons with a disability or healthcare needs;</txt></block></li><li guid="_bbf3977c-ffc2-4d6d-a0b9-6982ede49dd9" id="sec.99GD-ssec.3-def.healthcarebusinessorundertaking-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a dental clinic;</txt></block></li><li guid="_4d3b3a61-4da7-4eb5-b99b-722f17bb62a4" id="sec.99GD-ssec.3-def.healthcarebusinessorundertaking-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a hospital;</txt></block></li><li guid="_d3c7142c-a18e-4575-8751-6f7efcc8b7a6" id="sec.99GD-ssec.3-def.healthcarebusinessorundertaking-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a medical clinic;</txt></block></li><li guid="_00900592-9093-4dda-bb3e-9bf0a3191c4d" id="sec.99GD-ssec.3-def.healthcarebusinessorundertaking-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">a medical supply business or undertaking;</txt></block></li><li guid="_6e4d1c2c-5859-45e2-bc9f-c28656e6665f" id="sec.99GD-ssec.3-def.healthcarebusinessorundertaking-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">a pharmacy;</txt></block></li><li guid="_641723af-7861-4e5a-86a9-00eca55f80ed" id="sec.99GD-ssec.3-def.healthcarebusinessorundertaking-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">a business or undertaking that is substantially similar to a business or undertaking mentioned in any of paragraphs (a) to (f).</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d80a6deb-862e-4961-af97-308eb9642f89" id="sec.99GE" provision.type="other" spent.amends="0"><no>99GE </no><heading guid="_e515525c-7959-4475-9f42-adf20134107a" id="sec.99GE-he">Giving false or misleading information about banned single-use plastic items</heading><block><txt break.before="1">A person must not give information that the person knows is false or misleading to another person about—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_77cfcfe2-65fd-4f8d-aa7f-ed6d318f723e" id="sec.99GE-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the composition of a banned single-use plastic item; or</txt></block></li><li guid="_c2e994db-3511-4cd9-9deb-5781cf4088ad" id="sec.99GE-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether or not a plastic item is a banned single-use plastic item.</txt></block></li></list><penalty guid="_17ac66f0-979c-4f2c-a8ce-adee023a7840" id="sec.99GE-pen"><block><txt break.before="1">Maximum penalty—50 penalty units.</txt></block></penalty></block></clause></division><division affected.by.uncommenced="0" guid="_3bc6a9ae-a9b2-4820-a7dd-01073dba5455" id="ch.4-pt.3AA-div.3"><no>Division 3</no><heading guid="_c4deae6c-ea9d-48f6-b549-817d63899bbd" id="ch.4-pt.3AA-div.3-he">Compostable plastic items</heading><clause affected.by.uncommenced="0" guid="_d4516367-5359-48e6-94ed-aadf35b2c67a" id="sec.99GF" provision.type="other" spent.amends="0"><no>99GF </no><heading guid="_14431d51-ac1b-4ab3-868d-041f4c007c9e" id="sec.99GF-he">Stating conditions under which plastic items are compostable</heading><subclause affected.by.uncommenced="0" guid="_73da8321-873d-47c6-ba73-0cf05e51479c" id="sec.99GF-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a person—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_26a6d950-f7e6-4ad1-be81-95bd86b67bea" id="sec.99GF-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">conducts a manufacturing, wholesale, distribution or import business or undertaking; and</txt></block></li><li guid="_079765df-274f-4cdc-bcf2-bbd12d82140e" id="sec.99GF-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">in the course of conducting the business or undertaking, sells a plastic item that is compostable to another person.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_4b192062-0267-40a5-b14a-2df340c66811" id="sec.99GF-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The person must ensure the conditions under which the plastic item is compostable are clearly and legibly written—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_34c109bc-89a9-43cd-8030-cd139e102131" id="sec.99GF-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">on the packaging for the plastic item; or</txt></block></li><li guid="_f58393ec-b669-4323-919d-8cc5c303aa7e" id="sec.99GF-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">in information or a document accompanying the plastic item.</txt></block></li></list><penalty guid="_6b64df47-2685-4197-b635-33a90f6d3d10" id="sec.99GF-ssec.2-pen"><block><txt break.before="1">Maximum penalty—50 penalty units.</txt></block></penalty></block></subclause><subclause affected.by.uncommenced="0" guid="_758065a8-75ee-4506-aee1-32bfc3c96ee9" id="sec.99GF-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_3cdefe12-9af5-4dbf-87b1-4ab2918ea6eb" id="sec.99GF-ssec.3-def.condition_"><txt break.before="1"><defterm guid="_ca927886-6c83-4fb9-888b-372cad363deb" id="sec.99GF-ssec.3-def.condition" type="definition">condition</defterm>, under which a plastic item is compostable, includes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f69341ea-6353-4c9c-bf84-b53f16f045b4" id="sec.99GF-ssec.3-def.condition-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">whether the plastic item is suitable for industrial or home composting; and</txt></block></li><li guid="_a0af8eeb-3e05-4921-9ab2-68148d32fce8" id="sec.99GF-ssec.3-def.condition-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether the plastic item is compostable under AS 4736 or AS 5810.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_19ac754c-7338-4afa-a7c5-4aa2c4718167" id="sec.99GG" provision.type="other" spent.amends="0"><no>99GG </no><heading guid="_edb21353-5591-4bda-b047-6976643d5756" id="sec.99GG-he">Certification to chief executive about whether or not plastic items are compostable</heading><subclause affected.by.uncommenced="0" guid="_7a53829e-430a-434d-935e-91768d3fafaf" id="sec.99GG-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may give a notice under this section to a person if the chief executive believes the person—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ab3207c3-0c94-418a-858d-2732778fac33" id="sec.99GG-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">conducts a manufacturing, wholesale, distribution or import business or undertaking; and</txt></block></li><li guid="_fcea89a9-f944-404d-b1af-3d3f723097f7" id="sec.99GG-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">in the course of conducting the business or undertaking, sells to another person—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_278c4c9c-b711-4cfb-b280-84e6206b2769" id="sec.99GG-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a plastic item that is compostable (a <defterm guid="_86f29595-f0c4-4197-a836-afd9edb36c17" id="sec.99GG-ssec.1-para1.b-def.solditem" type="definition">sold item</defterm>); or</txt></block></li><li guid="_db27d032-3c84-4a78-9e81-2a9ed46a5e4d" id="sec.99GG-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a plastic item (also a <defterm guid="_a8a07dd0-de77-4cb7-b9b1-979a0b5cd9a7" id="sec.99GG-ssec.1-para1.b-def.solditem-oc.2" type="definition">sold item</defterm>) the person tells the other person is compostable.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_431dd050-15ad-454e-8c0f-ac324af35aaa" id="sec.99GG-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A notice under this section may require the person to give the chief executive a certification about the sold item.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5a146987-d4fe-4f8c-adb1-099104a87c4f" id="sec.99GG-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A person who is given a notice under this section must comply with the notice within 20 business days after receiving the notice unless the person has a reasonable excuse.</txt><penalty guid="_056f936d-844a-498e-9a78-fc4f431e7a16" id="sec.99GG-ssec.3-pen"><block><txt break.before="1">Maximum penalty—50 penalty units.</txt></block></penalty></block></subclause><subclause affected.by.uncommenced="0" guid="_1ebb3621-affa-40ef-8ad1-f6e61926f382" id="sec.99GG-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_ef24fd73-135e-4266-9764-efb1292e4f69" id="sec.99GG-ssec.4-def.certification_"><txt break.before="1"><defterm guid="_dbae6a16-b84d-4201-972f-555a00965704" id="sec.99GG-ssec.4-def.certification" type="definition">certification</defterm>, about a sold item, means a certification about whether or not the sold item is compostable that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ffe5c191-cf82-48a0-99ac-de5ade7ab279" id="sec.99GG-ssec.4-def.certification-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">includes the information decided by the chief executive; and</txt></block></li><li guid="_897a80f8-74c9-4f90-be89-588824ff3a12" id="sec.99GG-ssec.4-def.certification-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is in the form decided by the chief executive.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8908d4ab-10b5-49c7-8344-ad6e98cd3d3d" id="sec.99GH" provision.type="other" spent.amends="0"><no>99GH </no><heading guid="_e2d14b14-2c21-4045-81b8-4a3a26c8800c" id="sec.99GH-he">Giving false or misleading information about whether or not plastic items are compostable</heading><block><txt break.before="1">A person must not give information, or a document containing information, that the person knows is false or misleading to another person about whether or not a plastic item is compostable.</txt><penalty guid="_2a740444-3fed-400e-92e7-df8d55088035" id="sec.99GH-pen"><block><txt break.before="1">Maximum penalty—50 penalty units.</txt></block></penalty></block></clause></division><division affected.by.uncommenced="0" guid="_4fb0032b-f5ec-4b87-a964-19306dac6890" id="ch.4-pt.3AA-div.4"><no>Division 4</no><heading guid="_425f355a-f22d-444c-951d-d4dac51d7dd2" id="ch.4-pt.3AA-div.4-he">Review</heading><clause affected.by.uncommenced="0" guid="_64dea29c-060a-4923-b88c-ff0e0f55d542" id="sec.99GI" provision.type="other" spent.amends="0"><no>99GI </no><heading guid="_54770ecb-30d8-4942-9a43-db86e15cf358" id="sec.99GI-he">Review of part</heading><subclause affected.by.uncommenced="0" guid="_46d421a8-2e47-4c9f-9784-de0b32e0a896" id="sec.99GI-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister must ensure a review of the operation of this part starts not more than 2 years after the commencement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_760ae450-c6f6-4d99-aded-8acbfbb21872" id="sec.99GI-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The review must include a review of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_42e3dc17-671b-4ced-b46b-1d19fea879c2" id="sec.99GI-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the effect of this part on the community, especially persons with a disability or healthcare needs; and</txt></block></li><li guid="_615495ff-2e28-4384-a243-7a9c07660c69" id="sec.99GI-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the level of public knowledge and understanding about this part, including—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5b5155d2-9c1c-42dd-9dfe-4aa7d57de884" id="sec.99GI-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">what is or is not a banned single-use plastic item, and alternatives to banned single-use plastic items; and</txt></block></li><li guid="_bda4a8fc-b193-4c52-b5c7-8d237da865f6" id="sec.99GI-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">whether or not plastic items are compostable; and</txt></block></li></list></block></li><li guid="_78e58b8c-7d7f-45a5-97af-ac95bbdeaad1" id="sec.99GI-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the effectiveness of this part in reducing the number of single-use plastic items—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_553c424e-5430-4668-a71e-f519777089fd" id="sec.99GI-ssec.2-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">used or sold; and</txt></block></li><li guid="_2d92a9f8-a14a-4bb9-98e0-3d9cc35886fc" id="sec.99GI-ssec.2-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">that become waste and are littered or disposed of to landfill; and</txt></block></li></list></block></li><li guid="_e9b75259-cdd7-420f-8980-e10f5d06228a" id="sec.99GI-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the effect of this part on the use or sale of alternatives to single-use plastic items, including whether or not the alternatives are sustainable or designed to be used only once; and</txt></block></li><li guid="_116f5ecf-be08-44e6-b513-9f854ea2670a" id="sec.99GI-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the level of compliance with this part.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0a169904-1b91-462f-bad1-6b411d5740fd" id="sec.99GI-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive must give a report on the outcome of the review to the Minister within 6 months after the day the review starts.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_790b2128-f4b8-4e23-8db7-db69280be75a" id="sec.99GI-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The Minister must table the report in the Legislative Assembly within 12 sitting days after receiving the report.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" change="ins" guid="_09261c76-c19e-4389-8469-d909f990fb12" id="ch.4-pt.3AB"><no>Part 3AB</no><heading guid="_b95abf79-f459-4fce-9dbf-811963639abd" id="ch.4-pt.3AB-he">Lighter-than-air balloons</heading><clause affected.by.uncommenced="0" guid="_11697b5a-031e-46b6-ab53-0861bde105b3" id="sec.99GJ" provision.type="other" spent.amends="0"><no>99GJ </no><heading guid="_d96e75d4-9f55-48df-88f8-497753da6b98" id="sec.99GJ-he">Release of lighter-than-air balloons</heading><subclause affected.by.uncommenced="0" guid="_acc4ad9a-da91-42b7-9a5f-1ca459fc1f9d" id="sec.99GJ-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not release, or cause the release of, a lighter-than-air balloon unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b2c5d1de-7b56-4f19-aba8-f3912dcdc5e4" id="sec.99GJ-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the release happens inside a building or another structure and the balloon does not escape from the building or other structure into the environment; or</txt></block></li><li guid="_974bb029-2798-4e0a-b726-7bc1d8258d88" id="sec.99GJ-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the release is for scientific research, including, for example, meteorology.</txt></block></li></list><penalty guid="_0900f24b-8d54-492b-b431-7cfdfa0bddf3" id="sec.99GJ-ssec.1-pen"><block><txt break.before="1">Maximum penalty—50 penalty units.</txt></block></penalty></block></subclause><subclause affected.by.uncommenced="0" guid="_6a4dc26b-ea84-4557-b252-e923c9081a0f" id="sec.99GJ-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For subsection (1), a person releases a lighter-than-air balloon if the person allows the balloon to float in the atmosphere while the balloon is not attached, directly or indirectly, to the earth’s surface or a relevant weight.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_05ef5ef0-9e34-4b82-a927-c46b3cecbaf6" id="sec.99GJ-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Without limiting subsection (1), a person is taken to have caused the release of a lighter-than-air balloon if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7a68d8f5-42b4-462b-8497-cc7ff1ab3e52" id="sec.99GJ-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the person attaches the balloon, whether directly or indirectly, to the earth’s surface or a relevant weight; and</txt></block></li><li guid="_cb9cd166-8d44-4e0f-a501-3243d07d40a2" id="sec.99GJ-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the balloon detaches from the earth’s surface, or the relevant weight, without the assistance of another person; and</txt></block></li><li guid="_fd8bb1ef-10b5-4928-926d-405c0e28cd6f" id="sec.99GJ-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the person did not take reasonable steps to ensure the balloon could not detach from the earth’s surface or the relevant weight.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_19843ac5-ad81-448a-9d70-360890fd5cd1" id="sec.99GJ-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">This section does not limit section 103.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e38e84e0-7155-4fe6-a0dd-5ea85df9785c" id="sec.99GJ-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_5eb4a2be-cc14-4509-9732-5152f40f86a0" id="sec.99GJ-ssec.5-def.lighterthanairballoon_"><txt break.before="1"><defterm guid="_524868bc-e8d9-438e-873c-5d57a12a17b6" id="sec.99GJ-ssec.5-def.lighterthanairballoon" type="definition">lighter-than-air balloon</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_acdf45c1-6f99-4cef-8e10-8ecdfe8407f6" id="sec.99GJ-ssec.5-def.lighterthanairballoon-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">means an inflated balloon, or a lantern, that derives support in the atmosphere from buoyancy; but</txt></block></li><li guid="_a2b1e7e5-ec03-4d41-be49-2e5bd6799bc9" id="sec.99GJ-ssec.5-def.lighterthanairballoon-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">does not include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d5f5ca87-584f-44a5-8706-b923d5fc4ce9" id="sec.99GJ-ssec.5-def.lighterthanairballoon-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">an inflated balloon, or a lantern, that carries 1 or more persons, including, for example, a hot air balloon or blimp; or</txt></block></li><li guid="_8b762d77-05be-4726-9b3a-eedfa14ad536" id="sec.99GJ-ssec.5-def.lighterthanairballoon-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">an inflated balloon, or a lantern, that is a remotely-piloted aircraft.</txt></block></li></list></block></li></list></definition><definition affected.by.uncommenced="0" guid="_56fd6538-94a5-4edc-91f0-cc54010ce091" id="sec.99GJ-ssec.5-def.relevantweight_"><txt break.before="1"><defterm guid="_43072911-bae6-494f-a54f-c2c7d3f56ef7" id="sec.99GJ-ssec.5-def.relevantweight" type="definition">relevant weight</defterm>, in relation to a lighter-than-air balloon, means a person, or a thing, that is too heavy for the balloon to support in the atmosphere.</txt><note guid="_b5bb2fd7-56a0-46a8-9b67-9c16b006ea7d" id="sec.99GJ-ssec.5-def.relevantweight-note" type="example"><heading guid="_b82a97ed-f019-4801-8a0d-4a49dfb5f8b7" id="sec.99GJ-ssec.5-def.relevantweight-note-he">Examples of a thing—</heading><block><txt break.before="1">a vehicle or a structure</txt></block></note></definition><definition affected.by.uncommenced="0" guid="_77ccd213-c5ae-4b0b-b172-e15a06b772d1" id="sec.99GJ-ssec.5-def.remotelypilotedaircraft_"><txt break.before="1"><defterm guid="_f0400f92-9573-4ea1-871e-f9ca9935af8a" id="sec.99GJ-ssec.5-def.remotelypilotedaircraft" type="definition">remotely-piloted aircraft</defterm> means an aircraft that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_087f6e30-b2c5-498f-89fd-8f7397aa528b" id="sec.99GJ-ssec.5-def.remotelypilotedaircraft-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">can not carry a person; and</txt></block></li><li guid="_97f5ca00-f7d5-41aa-bbb2-5762d0b47876" id="sec.99GJ-ssec.5-def.remotelypilotedaircraft-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">either—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ed46c670-62e0-4c6e-b044-32414dc93736" id="sec.99GJ-ssec.5-def.remotelypilotedaircraft-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">is remotely piloted or otherwise controlled; or</txt></block></li><li guid="_21faf8f9-3525-46e3-a574-63dc577af9b4" id="sec.99GJ-ssec.5-def.remotelypilotedaircraft-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">is able to be programmed to independently fly a particular route.</txt></block></li></list></block></li></list></definition></deflist></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_966a4f59-9a4a-4284-944b-1b3cc55c7b8c" id="ch.4-pt.3B"><no>Part 3B</no><heading guid="_1d9df4be-4f26-4253-b5a0-9d770e721255" id="ch.4-pt.3B-he">Beverage container refund scheme</heading><division affected.by.uncommenced="0" guid="_43f32750-a9e2-4f86-b875-5dc8e34659d5" id="ch.4-pt.3B-div.1"><no>Division 1</no><heading guid="_75875586-1dc6-444d-bf42-36e6c87a7e03" id="ch.4-pt.3B-div.1-he">Introduction</heading><subdivision affected.by.uncommenced="0" guid="_556227ff-7231-4983-9657-e452043660b9" id="ch.4-pt.3B-div.1-sdiv.1"><no>Subdivision 1</no><heading guid="_7e4f9b49-22ea-46e5-bff6-9823b21e768b" id="ch.4-pt.3B-div.1-sdiv.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_9925610b-7c76-4537-b8b8-49a2cb8e415f" id="sec.99H" provision.type="other" spent.amends="0"><no>99H </no><heading guid="_f944ca1a-66da-4b25-9b6a-b87915d756ca" id="sec.99H-he">Objects of part</heading><block><txt break.before="1">The main objects of this part are to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d20b9c32-7f2f-4696-9c6f-7ce66aa93634" id="sec.99H-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">increase the recovery and recycling of empty beverage containers; and</txt></block></li><li guid="_0de2af75-e296-4c8b-a561-38528544c05c" id="sec.99H-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">reduce the number of empty beverage containers that are littered or disposed of to landfill; and</txt></block></li><li guid="_2e4cbf54-6c86-4cfa-888c-60361a13cc12" id="sec.99H-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">ensure the manufacturers of beverage products meet their product stewardship responsibility in relation to their beverage products; and</txt></block></li><li guid="_dd9661ad-fd0c-471f-aeaa-f8a7f4a2175b" id="sec.99H-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">provide opportunities for social enterprise, and benefits for community organisations, by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fc2153d6-30b4-414d-a2be-aa3c47784eed" id="sec.99H-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">making funds available through the payment of refund amounts for empty beverage containers; and</txt></block></li><li guid="_3e6f2dd0-1e47-4f05-97d2-34e7a15e7a83" id="sec.99H-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">creating opportunities for employment in activities related to collecting, sorting and processing containers for recycling; and</txt></block></li></list></block></li><li guid="_d9072060-48c0-4068-bd8c-73da203d6156" id="sec.99H-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">complement existing collection and recycling activities for recyclable waste.</txt><note guid="_0b2c61fd-7ec3-4611-bbc7-759b27764b40" id="sec.99H-para1.e-note" type="example"><heading guid="_6775ea37-0957-42e0-9a45-75c0854275aa" id="sec.99H-para1.e-note-he">Example of existing collection and recycling activities—</heading><block><txt break.before="1">Local governments collect recyclable waste through kerbside waste collection services and arrange for the waste to be recycled.</txt></block></note></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_99d3bc4e-42e5-4194-835d-ec31b7be181f" id="sec.99I" provision.type="other" spent.amends="0"><no>99I </no><heading guid="_6e12af5d-6f3b-474f-8df7-1c27a8941ad4" id="sec.99I-he">How objects are to be achieved</heading><block><txt break.before="1">The objects are achieved by providing for a container refund scheme (the <defterm guid="_6ba8e128-d520-4911-b0cb-43f5f69ff31f" id="def.scheme" type="definition">scheme</defterm>) that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1d11aa7c-e9a6-4848-9092-7437fe31d7a0" id="sec.99I-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">encourages consumers to collect empty beverage containers for recycling by providing for refund amounts to be paid for the containers; and</txt></block></li><li guid="_a783e636-1440-4508-b54d-7a72ddb6f947" id="sec.99I-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">encourages waste management service providers to ensure empty beverage containers collected through general waste services are recycled by providing for recovery amounts to be paid for containers sent for recycling; and</txt></block></li><li guid="_c9a065c1-ba31-4276-88a1-140c284d01f5" id="sec.99I-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">recognises the role of the manufacturers of beverage products in generating waste in the form of empty containers by requiring the manufacturers to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e3a59c3e-4d20-4aed-8d8a-369f592665b8" id="sec.99I-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">contribute to the cost of refund amounts paid for the containers and the cost of administering the scheme; and</txt></block></li><li guid="_52148725-7660-4f24-84c3-7de22e347682" id="sec.99I-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">ensure containers for their beverage products are made of materials that are suitable for recycling; and</txt></block></li></list></block></li><li guid="_cc1bdf5e-8d00-45d6-9dbb-2632337e1daf" id="sec.99I-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">is administered by the Product Responsibility Organisation.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_55a74d53-7e14-4513-93ed-7220295bff9f" id="sec.99J" provision.type="other" spent.amends="0"><no>99J </no><heading guid="_37da0d1e-0714-4f59-9b79-e05598f12337" id="sec.99J-he">Functions of Product Responsibility Organisation</heading><subclause affected.by.uncommenced="0" guid="_d92bcce3-5b8b-4d44-bc4c-04c6b487da4b" id="sec.99J-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Product Responsibility Organisation’s main function is to administer and provide governance for the scheme.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_06868b1c-55f5-41a5-bdb4-9b3fd7acc07e" id="sec.99J-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.99J-ssec.1" target.guid="_d92bcce3-5b8b-4d44-bc4c-04c6b487da4b">subsection (1)</intref>, the Organisation has the following functions—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ef34d3e4-936a-47db-9938-2a6cc730aebe" id="sec.99J-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to ensure ongoing, efficient and effective arrangements are available in Queensland for empty beverage containers to be collected, sorted and recycled;</txt></block></li><li guid="_99e8b14e-ce35-4bd1-8333-b54ba48b0939" id="sec.99J-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to establish a network of container refund points to, as far as practicable, provide communities in Queensland with access to a place for the return of empty beverage containers for the payment of refund amounts;</txt></block></li><li guid="_c8a973be-02fa-4b44-81df-f9dd7cd6cdf7" id="sec.99J-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">to ensure manufacturers of beverage products fund the scheme by requiring the manufacturers to pay sufficient amounts under container recovery agreements;</txt></block></li><li guid="_7dc94e42-6973-4315-b57b-c138e2749109" id="sec.99J-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">to set the amounts payable, or the method for working out the amounts payable, under the scheme—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1e8f5031-891b-4287-9c30-f23209d767b8" id="sec.99J-ssec.2-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">by manufacturers of beverage products to fund the scheme; and</txt></block></li><li guid="_6bffaa42-5fdf-4648-b792-bde522b6420c" id="sec.99J-ssec.2-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">to the operators of container refund points to pay the refund amounts for empty beverage containers and to handle, sort and transport the containers for recycling;</txt></block></li></list></block></li><li guid="_c02bdf56-2dd8-4ed5-943e-96fa4d57996f" id="sec.99J-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">to identify manufacturers of beverage products who are not participating in the scheme, including, for example, because a manufacturer—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_91a6c1f7-11fc-4aa7-8f4e-52c8a02e69b8" id="sec.99J-ssec.2-para1.e-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">is selling beverages in containers that are not registered; or</txt></block></li><li guid="_e9a44be6-f2ac-4348-bce4-136a76981b6f" id="sec.99J-ssec.2-para1.e-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">has not entered into a container recovery agreement with the Organisation;</txt></block></li></list></block></li><li guid="_0b88c326-fb04-4917-b6cd-2a20268bf1f7" id="sec.99J-ssec.2-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">to promote the scheme and the location of container refund points;</txt></block></li><li guid="_8aeac28c-5a1d-443d-aa47-90b58e3c8a84" id="sec.99J-ssec.2-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">to receive and deal with complaints relating to the scheme from members of the public and entities participating in the scheme;</txt></block></li><li guid="_0eb6de1c-7b4f-45d9-bc33-cd84d881c59d" id="sec.99J-ssec.2-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">the functions given to it under this Act or another Act.</txt></block></li></list></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_f5651fec-1562-4a35-81da-20cd478fdb4c" id="ch.4-pt.3B-div.1-sdiv.2"><no>Subdivision 2</no><heading guid="_ce5a77ff-fd83-4af0-afce-3ec439eece4e" id="ch.4-pt.3B-div.1-sdiv.2-he">Definitions</heading><clause affected.by.uncommenced="0" guid="_23445d2e-ee94-474c-8107-0fd8e715f37e" id="sec.99K" provision.type="other" spent.amends="0"><no>99K </no><heading guid="_2ee6783e-b5fa-4492-81ca-95c1623fa62e" id="sec.99K-he">Definitions for part</heading><block><txt break.before="1">In this part—</txt><deflist><definition affected.by.uncommenced="0" guid="_fd5f393a-5741-4a11-b43f-0142a7c32cb2" id="sec.99K-def.beverage_"><txt break.before="1"><defterm guid="_236aaba6-ab83-4f6e-a6ec-db5955972d34" id="sec.99K-def.beverage" type="definition">beverage</defterm> see <intref check="valid" refid="sec.99L" target.guid="_5367545a-9e1a-41d9-be86-a8dcc7b2d9ec">section 99L</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_6cd7a0de-2a29-4ff9-8755-808cdad02e71" id="sec.99K-def.beverageproduct_"><txt break.before="1"><defterm guid="_6fd592e6-7c0e-416e-9d3d-233d7d1815d1" id="sec.99K-def.beverageproduct" type="definition">beverage product</defterm> see <intref check="valid" refid="sec.99N" target.guid="_2759e633-4c4c-430d-8495-752aaa1d4d05">section 99N</intref><intref check="valid" refid="sec.99N-ssec.1" target.guid="_9fc0f991-a71d-418a-9075-084e9830660a">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_0b0ebd47-1792-425b-86a0-549df3c5ab96" id="sec.99K-def.container_"><txt break.before="1"><defterm guid="_cc4a276e-026b-4105-afcd-1a2be0d1f6c1" id="sec.99K-def.container" type="definition">container</defterm> see <intref check="valid" refid="sec.99M" target.guid="_dbfc271a-09de-49f8-a414-a75132833a31">section 99M</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_71cbb84b-51d6-4402-8ab4-00cbd9e7964d" id="sec.99K-def.containerapproval_"><txt break.before="1"><defterm guid="_41e8d164-103b-4074-8ac5-88e6c86d175a" id="sec.99K-def.containerapproval" type="definition">container approval</defterm>, for a beverage product, see <intref check="valid" refid="sec.99ZN" target.guid="_7e7c5b98-ba6b-4579-a122-bde8eb35f0e9">section 99ZN</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_d5fec9ff-592c-44b3-84f4-67be76120d11" id="sec.99K-def.containercollectionagreement_"><txt break.before="1"><defterm guid="_b87eebd0-bb7d-41d8-90ea-1d78877f27ae" id="sec.99K-def.containercollectionagreement" type="definition">container collection agreement</defterm> see <intref check="valid" refid="sec.99ZA" target.guid="_cb8d5a5d-e58b-4067-9dd0-7f33c9c26848">section 99ZA</intref><intref check="valid" refid="sec.99ZA-ssec.1" target.guid="_347ffa6d-0829-4abe-a7ab-8d399f0e2f78">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_953d9ce6-f6ea-4e6c-9d64-7196c6da0418" id="sec.99K-def.containerrecoveryagreement_"><txt break.before="1"><defterm guid="_ce5f2e17-5b5b-423b-a394-f47e967507f6" id="sec.99K-def.containerrecoveryagreement" type="definition">container recovery agreement</defterm> see <intref check="valid" refid="sec.99Q" target.guid="_0401784c-4961-40ee-a048-bb61424f111b">section 99Q</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_82467106-c454-4386-925e-401622dd2626" id="sec.99K-def.containerrefundpoint_"><txt break.before="1"><defterm guid="_5644da34-b1dd-4b00-9f16-c48414250569" id="sec.99K-def.containerrefundpoint" type="definition">container refund point</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_04270f61-d37b-47af-b65d-4d5a3b7999bd" id="sec.99K-def.containerrefundpoint-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">means a facility or other place—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9855d03b-bc5e-4976-8a5c-e993d15fcf2a" id="sec.99K-def.containerrefundpoint-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">at which empty containers may be returned in exchange for the payment of refund amounts; and</txt></block></li><li guid="_bc5c8813-be5b-4eb8-bbc1-ef72db7e716d" id="sec.99K-def.containerrefundpoint-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">that may be operated on a permanent, temporary or mobile basis; and</txt></block></li></list></block></li><li guid="_6c49f643-eb9b-4618-ba9c-7d52a664d561" id="sec.99K-def.containerrefundpoint-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">includes a reverse vending machine.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_464300ce-0ad9-4770-8f6d-9793330e2719" id="sec.99K-def.extraordinarycircumstancesexemption_"><txt break.before="1"><defterm guid="_c3d15b06-cd8a-4f58-aff1-56abb4481e7b" id="sec.99K-def.extraordinarycircumstancesexemption" type="definition">extraordinary circumstances exemption</defterm> see <intref check="valid" refid="sec.99ZY" target.guid="_b4d1a6a6-a697-42d1-a1bc-476371e55f3e">section 99ZY</intref><intref check="valid" refid="sec.99ZY-ssec.2" target.guid="_fcb1f25d-6213-42f0-93bb-4dcede99f86c">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_f390314f-39f9-4a9f-92b8-8045eec1fdf2" id="sec.99K-def.manufacturer_"><txt break.before="1"><defterm guid="_3b86a3d3-77b0-4bef-ace7-11717e688fc5" id="sec.99K-def.manufacturer" type="definition">manufacturer</defterm>, of a beverage product, see <intref check="valid" refid="sec.99O" target.guid="_f354b7b3-f257-436f-a999-d9ae08a15928">section 99O</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_ec1f5de2-330c-48c0-b4b3-1d264fafb1eb" id="sec.99K-def.materialrecoveryagreement_"><txt break.before="1"><defterm guid="_a6d2aa7b-4dfe-4eee-8566-cf6d41b8bbf8" id="sec.99K-def.materialrecoveryagreement" type="definition">material recovery agreement</defterm> see <intref check="valid" refid="sec.99ZF" target.guid="_33938bd0-a5b5-4e5f-aa4b-4d2caff4e5c1">section 99ZF</intref><intref check="valid" refid="sec.99ZF-ssec.1" target.guid="_600d67a1-68ca-404e-a411-cfcb83a5b988">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_e449d279-daa1-4431-86aa-41d120aa924c" id="sec.99K-def.materialrecoveryfacility_"><txt break.before="1"><defterm guid="_880f26b0-9e92-4c12-80d2-e04aaaec68e0" id="sec.99K-def.materialrecoveryfacility" type="definition">material recovery facility</defterm> see <intref check="valid" refid="sec.99ZE" target.guid="_33139e39-0e65-48f1-8900-6123d1482f17">section 99ZE</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_9a4a4bda-39b0-45bd-a7e6-8e278d91c62b" id="sec.99K-def.operator_"><txt break.before="1"><defterm guid="_5654bbd9-9e0d-470c-84d5-cc41ac76886e" id="sec.99K-def.operator" type="definition">operator</defterm>, of a container refund point that is a reverse vending machine, means the person who—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6d5357a3-605c-42b0-a98f-fdb1f53b96ea" id="sec.99K-def.operator-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the owner of the reverse vending machine has leased or hired it to another person—leases or hires the reverse vending machine; or</txt></block></li><li guid="_300e4086-1c86-4247-a0d3-7cdca65ddd43" id="sec.99K-def.operator-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—owns the reverse vending machine.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_9942f0ef-f861-46ea-a4e7-9b8566ee4183" id="sec.99K-def.recoveryamount_"><txt break.before="1"><defterm guid="_9f372d25-cead-4730-a011-1acd6bea5eb4" id="sec.99K-def.recoveryamount" type="definition">recovery amount</defterm>, for a quantity of containers, see <intref check="valid" refid="sec.99ZG" target.guid="_6287134c-07d0-4e2e-855d-b93c296747d0">section 99ZG</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_5905eff3-e363-4398-ad25-aa3347fbb99d" id="sec.99K-def.recoveryamountprotocol_"><txt break.before="1"><defterm guid="_0d07147e-eebc-4d73-b084-b5bf3e9b7f00" id="sec.99K-def.recoveryamountprotocol" type="definition">recovery amount protocol</defterm> see <intref check="valid" refid="sec.99ZK" target.guid="_9e3b884e-c80f-42a1-910b-6dac15a9c528">section 99ZK</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_f1a85a20-0eed-4246-b2b8-84491cb0f3c5" id="sec.99K-def.refundamount_"><txt break.before="1"><defterm guid="_31a7c739-87ac-46ee-9694-3a65a2cd4e76" id="sec.99K-def.refundamount" type="definition">refund amount</defterm> means the amount prescribed by regulation as the refund amount.</txt></definition><definition affected.by.uncommenced="0" guid="_4dc2e5b8-40e5-4e4f-98d2-be48f42beab2" id="sec.99K-def.refunddeclaration_"><txt break.before="1"><defterm guid="_dae11a77-260b-4a20-a047-d831587744ed" id="sec.99K-def.refunddeclaration" type="definition">refund declaration</defterm> see <intref check="valid" refid="sec.99T" target.guid="_a8737675-d7cf-452e-bffe-7022e13b0eb8">section 99T</intref><intref check="valid" refid="sec.99T-ssec.2" target.guid="_4e42d772-8753-486c-bd04-2903bb037bef">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_0326ea9b-e6f5-4f30-8a7c-7dab93317c34" id="sec.99K-def.refundmarking_"><txt break.before="1"><defterm guid="_c866f034-2cbf-4a16-b312-cdec49813628" id="sec.99K-def.refundmarking" type="definition">refund marking</defterm> means the marking or labelling about the refund amount payable for a container under the scheme that complies with the requirements prescribed by regulation.</txt></definition><definition affected.by.uncommenced="0" guid="_2c1b292e-0a3c-4676-886f-78b0a15f7658" id="sec.99K-def.registered_"><txt break.before="1"><defterm guid="_09fe9852-8445-468c-9794-5e7515f340ac" id="sec.99K-def.registered" type="definition">registered</defterm>, for a container, means the container is included in the register of approved containers kept under <intref check="valid" refid="sec.99ZM" target.guid="_4b65b796-eb3c-44bc-9c13-b04206720dba">section 99ZM</intref><intref check="valid" refid="sec.99ZM-ssec.1" target.guid="_ccc3996c-89dc-40c4-93ca-0a02f8ec53f4">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_ae075432-1fe7-477f-aa81-ded9e3dfc664" id="sec.99K-def.reversevendingmachine_"><txt break.before="1"><defterm guid="_10e1306f-cdf0-4e85-9842-746ec38bc977" id="sec.99K-def.reversevendingmachine" type="definition">reverse vending machine</defterm> means a device for collecting empty containers that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f6cb03fa-8511-4250-8c6c-1ed03f031fca" id="sec.99K-def.reversevendingmachine-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the device recognises a container placed in the device as a container for which a refund amount is payable under the scheme by, for example, scanning the container’s barcode—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2ca56c10-32be-4a33-9871-dddc0daad0d9" id="sec.99K-def.reversevendingmachine-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">accepts the container; and</txt></block></li><li guid="_cd9b8cf2-13b6-4441-ae9e-de8cafde8fe8" id="sec.99K-def.reversevendingmachine-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">dispenses the refund amount for the container in a way stated on or near the machine; or</txt></block></li></list></block></li><li guid="_bddf67d5-7dfb-4176-a338-6090a0be6161" id="sec.99K-def.reversevendingmachine-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—refuses to accept the container.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_975f715d-ccab-4b11-a8cf-c4e543c7fa59" id="sec.99K-def.type_"><txt break.before="1"><defterm guid="_44712e93-9ef3-45e4-88f4-f296782a6f93" id="sec.99K-def.type" type="definition">type</defterm>, of a container, see <intref check="valid" refid="sec.99N" target.guid="_2759e633-4c4c-430d-8495-752aaa1d4d05">section 99N</intref><intref check="valid" refid="sec.99N-ssec.2" target.guid="_8c758696-fb3b-4a13-aaf3-dc081e0aa4bd">(2)</intref>.</txt></definition></deflist></block></clause><clause affected.by.uncommenced="0" guid="_5367545a-9e1a-41d9-be86-a8dcc7b2d9ec" id="sec.99L" provision.type="other" spent.amends="0"><no>99L </no><heading guid="_f8ac8f6b-ef70-4cb1-b03f-93842b696157" id="sec.99L-he">Meaning of <defterm guid="_4c70a8f3-141b-4bc3-a122-aa9c333cecf4" type="mention">beverage</defterm></heading><subclause affected.by.uncommenced="0" guid="_fa394a5e-a8ff-43bc-839b-322113f7f058" id="sec.99L-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A <defterm guid="_bac72eef-52ad-4ad0-bcb8-fdf06f548ca0" id="sec.99L-def.beverage-oc.2" type="definition">beverage</defterm> is a liquid intended for human consumption by drinking.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_90302893-bec6-45c7-bd3b-1ed1d4ea1c22" id="sec.99L-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, a beverage does not include a liquid prescribed by regulation to not be a beverage for this section.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_dbfc271a-09de-49f8-a414-a75132833a31" id="sec.99M" provision.type="other" spent.amends="0"><no>99M </no><heading guid="_4debd6fb-4c85-40fc-96cc-dbf07776812a" id="sec.99M-he">Meaning of <defterm guid="_5b49b020-ccf8-4da8-a066-588eb374e22f" type="mention">container</defterm></heading><subclause affected.by.uncommenced="0" guid="_caded712-9639-439c-a90e-bbced2715fc2" id="sec.99M-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A <defterm guid="_7cb0c2ed-d6c6-4f34-834e-f8dd5bfdfe73" id="sec.99M-def.container-oc.2" type="definition">container</defterm> is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4e617840-d315-4ca4-a3e6-3538886e420b" id="sec.99M-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a container that is made to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1a35420b-72a9-46bc-a24b-0210c2fc4dc5" id="sec.99M-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">contain a beverage; and</txt></block></li><li guid="_3c435a94-f2b5-4f5e-ae2c-8ce496140abe" id="sec.99M-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">when filled with a beverage, be sealed for storage, transport and handling before being sold for the beverage to be consumed; or</txt></block></li></list></block></li><li guid="_105c0d35-96e2-4019-8456-5152f91ddc92" id="sec.99M-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">another container prescribed by regulation as a container for this section.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a9038ac5-14d7-4321-a428-6924e402a279" id="sec.99M-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, a container does not include a container prescribed by regulation to not be a container for this section.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2759e633-4c4c-430d-8495-752aaa1d4d05" id="sec.99N" provision.type="other" spent.amends="0"><no>99N </no><heading guid="_7c793fd2-541a-493b-8352-049469ef3e58" id="sec.99N-he">Meaning of <defterm guid="_c408ff53-13c4-42af-b9cc-db009e8fc3ab" type="mention">beverage product</defterm> and <defterm guid="_3d9e1ed8-459e-49e4-83a5-53f6ef22c1c2" type="mention">type</defterm> of container</heading><subclause affected.by.uncommenced="0" guid="_9fc0f991-a71d-418a-9075-084e9830660a" id="sec.99N-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A <defterm guid="_028fc213-3596-4a5e-b5d9-65de93dc5106" id="sec.99N-def.beverageproduct-oc.2" type="definition">beverage product</defterm> is the combination of a particular beverage packaged in a container of a particular type.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8c758696-fb3b-4a13-aaf3-dc081e0aa4bd" id="sec.99N-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The <defterm guid="_810f3adf-9103-44df-90a8-b1b5f45e91b4" id="sec.99N-def.type-oc.2" type="definition">type</defterm> of a container is the combination of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_47106633-43a9-49e6-b4c3-84c3f96ff4b6" id="sec.99N-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the volume of a beverage the container is made to hold; and</txt></block></li><li guid="_e89e3675-7e9d-48da-860d-5ab7b6835020" id="sec.99N-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the material the container is made of.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f354b7b3-f257-436f-a999-d9ae08a15928" id="sec.99O" provision.type="other" spent.amends="0"><no>99O </no><heading guid="_52c9288e-453f-4d54-914b-fde48ce043aa" id="sec.99O-he">Meaning of <defterm guid="_866c62db-beb9-4d7c-88eb-6533559b8405" type="mention">manufacturer</defterm></heading><subclause affected.by.uncommenced="0" guid="_c766a94a-9e86-4f0f-bb2d-60192894abfc" id="sec.99O-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person is a <defterm guid="_b6d9a5c1-2c8e-4171-babc-e5cc9e36e7b7" id="sec.99O-def.manufacturer-oc.2" type="definition">manufacturer</defterm> of a beverage product if the person—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0fbc86aa-6e6c-427f-b2ff-d8aa8421f975" id="sec.99O-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">makes the beverage product, including, for example—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9fa75510-ad50-4330-9d9b-5615148bc925" id="sec.99O-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">by filling containers with a beverage; or</txt></block></li><li guid="_96c311ec-d942-4580-8f14-2957976cbcc2" id="sec.99O-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">engaging another person under a contract to make the beverage product or fill containers with a beverage for the person; or</txt></block></li></list></block></li><li guid="_d19e277a-3372-475d-9c03-a87998045be0" id="sec.99O-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">imports the beverage product from a foreign country; or</txt></block></li><li guid="_70c44165-124f-4e12-bf8a-e6943f80db7b" id="sec.99O-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">arranges for the distribution of the beverage product in Queensland.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_92cde3b7-f4da-4ae7-b8a1-9dd48769da2c" id="sec.99O-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.99O-ssec.1" target.guid="_c766a94a-9e86-4f0f-bb2d-60192894abfc">subsection (1)</intref><intref check="valid" refid="sec.99O-ssec.1-para1.a" target.guid="_0fbc86aa-6e6c-427f-b2ff-d8aa8421f975">(a)</intref> and <intref check="valid" refid="sec.99O-ssec.1-para1.b" target.guid="_d19e277a-3372-475d-9c03-a87998045be0">(b)</intref>, it does not matter whether the beverage product is made in, or imported into, Queensland or another State.</txt></block></subclause></clause></subdivision></division><division affected.by.uncommenced="0" guid="_b4627488-24a1-497b-9540-3f3f6a3ed42d" id="ch.4-pt.3B-div.2"><no>Division 2</no><heading guid="_92cbb8a2-3590-42f4-a010-1d7855ffc1c2" id="ch.4-pt.3B-div.2-he">Sale of beverages in containers</heading><clause affected.by.uncommenced="0" guid="_6c912cc1-474c-4d13-aa83-2a9dd71721c6" id="sec.99P" provision.type="other" spent.amends="0"><no>99P </no><heading guid="_fefc5f56-512a-4255-b71b-63bdaefa74d8" id="sec.99P-he">Restriction on manufacturer selling beverage product</heading><subclause affected.by.uncommenced="0" guid="_2f7abaac-2675-41c4-9e0a-a22554d723d2" id="sec.99P-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A manufacturer of a beverage product must not sell the beverage product to another person to use or consume in Queensland, or to sell for use, consumption or further sale in Queensland, unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0539ae89-e26e-4729-8ff6-bf45474a7b99" id="sec.99P-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a container recovery agreement is in force for the type of container used for the beverage product; and</txt></block></li><li guid="_675e4310-4fa3-4b4a-b18f-dbde19a41161" id="sec.99P-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the container is registered; and</txt></block></li><li guid="_4d775484-6a3e-4011-ae92-fc44e9c1e04b" id="sec.99P-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the container displays—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_077d85fd-b8d8-4a4f-a3ec-c0ca1bd5f6b7" id="sec.99P-ssec.1-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the refund marking; and</txt></block></li><li guid="_947d225d-62e0-4b1f-b9d1-d08814386f21" id="sec.99P-ssec.1-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a barcode for the beverage product.</txt></block></li></list></block></li></list><penalty guid="_730a18de-75b6-40dd-8331-3dc9b86d54c4" id="sec.99P-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></block></subclause><subclause affected.by.uncommenced="0" guid="_974623d3-10a8-4c39-9b65-45c58a5a542d" id="sec.99P-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For this section, it does not matter whether the beverage manufacturer sells the beverage product in Queensland, in another State or somewhere else.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0401784c-4961-40ee-a048-bb61424f111b" id="sec.99Q" provision.type="other" spent.amends="0"><no>99Q </no><heading guid="_51f65987-bc30-4757-9452-76b32e25e4ba" id="sec.99Q-he">Container recovery agreement</heading><subclause affected.by.uncommenced="0" guid="_c6031653-a8f1-4a3a-b5c2-1c86f6cc8651" id="sec.99Q-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A <defterm guid="_50b6a431-7c32-4d4b-a4e9-3b8e1c09f0aa" id="sec.99Q-def.containerrecoveryagreement" type="definition">container recovery agreement</defterm> is a written agreement between the Organisation and a manufacturer of a beverage product about the type of container used for the product.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_79563ba5-325e-407a-b131-dc898c8ed1cc" id="sec.99Q-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The purpose of a container recovery agreement is to ensure the manufacturer contributes to the cost of the scheme, including, for example, the cost of the refund amounts paid for empty containers under the scheme.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_51710358-c32f-4977-a592-bd71544d1c75" id="sec.99Q-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Organisation must not enter into a container recovery agreement with the manufacturer for a type of container unless the Organisation is satisfied ongoing, effective and appropriate arrangements for the container type to be collected, sorted and recycled are available.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_da725cc6-b1a7-4ad1-9971-4548c5ab6398" id="sec.99Q-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A container recovery agreement must include provisions about the following matters—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c14da861-2964-48b7-badd-451189ad6c87" id="sec.99Q-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the manufacturer’s obligations in relation to paying amounts to the Organisation, including how each amount is worked out and when it is to be paid, to contribute to the costs of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1ee6554b-a29d-4088-a75e-392f32e03a18" id="sec.99Q-ssec.4-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">refund amounts for empty containers of the manufacturer’s beverage products to be paid under the scheme; and</txt></block></li><li guid="_dac41cdd-489f-4dd3-bb18-cf9dcbdd411f" id="sec.99Q-ssec.4-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the administration of the scheme, including amounts paid to the operators of container refund points under the scheme;</txt></block></li></list></block></li><li guid="_09584cbf-7390-4950-81f6-57a5e5c20ca2" id="sec.99Q-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the manufacturer’s obligations in relation to giving information to the Organisation about the beverage products made or imported for sale in Queensland by the manufacturer, including how and when the information is to be given;</txt></block></li><li guid="_32e19f57-6cef-4c4e-8f90-14cec510c4ed" id="sec.99Q-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a dispute resolution process for settling disputes between the Organisation and the manufacturer;</txt></block></li><li guid="_14ea7c74-ed81-452b-a15b-187ebf559dfb" id="sec.99Q-ssec.4-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">when the agreement must be reviewed;</txt></block></li><li guid="_bf63c277-56df-4933-bc75-3c72f1ca0190" id="sec.99Q-ssec.4-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">a process for either party to the agreement to seek an earlier review of the agreement or an amendment to it;</txt></block></li><li guid="_ce15031d-10bd-498a-9201-61692365419e" id="sec.99Q-ssec.4-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">other matters prescribed by regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_fe191f27-d5d1-436b-ae67-7b0799f94808" id="sec.99Q-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">A container recovery agreement must also include the standard terms, about a matter mentioned in <intref check="valid" refid="sec.99Q-ssec.4" target.guid="_da725cc6-b1a7-4ad1-9971-4548c5ab6398">subsection (4)</intref> or another matter, prescribed by regulation.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0425f7a8-8125-4224-94ea-b9c96549f6da" id="sec.99R" provision.type="other" spent.amends="0"><no>99R </no><heading guid="_d3396668-b842-463f-bb35-581512245911" id="sec.99R-he">Limits on amounts paid by small beverage manufacturers under container recovery agreements</heading><subclause affected.by.uncommenced="0" guid="_3bd70636-68ad-431b-a7c8-ab5e000731bc" id="sec.99R-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A small beverage manufacturer must not, under a container recovery agreement, be required to pay an amount to contribute to the costs of the scheme that is more than the amount worked out under a regulation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0d2bd664-9da5-4475-9ec9-b9e171917b37" id="sec.99R-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_f07401a1-65fc-49c6-b125-84d3624033bc" id="sec.99R-ssec.2-def.smallbeveragemanufacturer_"><txt break.before="1"><defterm guid="_fc14e5af-d485-4f03-a9b1-a54044894726" id="sec.99R-ssec.2-def.smallbeveragemanufacturer" type="definition">small beverage manufacturer</defterm> means a manufacturer of a beverage product who is prescribed by regulation to be a small beverage manufacturer.</txt></definition></deflist></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_9d6a348c-b08f-4c2a-b034-7d1fc1664b4e" id="ch.4-pt.3B-div.3"><no>Division 3</no><heading guid="_d3133683-42f9-48a9-970c-6b8563136dbd" id="ch.4-pt.3B-div.3-he">Refund amounts for empty containers and container refund points</heading><subdivision affected.by.uncommenced="0" guid="_5e1fac88-c3d7-414d-9e5b-777ba73a2dd1" id="ch.4-pt.3B-div.3-sdiv.1"><no>Subdivision 1</no><heading guid="_14a6c54b-dadc-4bad-9866-bdcbcaf4d477" id="ch.4-pt.3B-div.3-sdiv.1-he">Claiming refund amounts for empty containers</heading><clause affected.by.uncommenced="0" guid="_46ec8d39-f4a9-4e71-86a6-a162e9fc24c3" id="sec.99S" provision.type="other" spent.amends="0"><no>99S</no><heading guid="_85645f17-52bd-49c4-bf06-78b9936dcae7" id="sec.99S-he">Claiming refund amount from container refund point</heading><subclause affected.by.uncommenced="0" guid="_def76e7f-1d0e-48a1-bea4-5ebcaebec7df" id="sec.99S-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person may claim a refund amount for an empty container by presenting the container at a container refund point.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_99a61e6e-971d-4540-8786-98bdd0222553" id="sec.99S-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The operator of the container refund point must accept the container and pay the person the refund amount for the container.</txt><penalty guid="_d0741892-abf2-4057-b937-0f4a28d14da2" id="sec.99S-ssec.2-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></block></subclause><subclause affected.by.uncommenced="0" guid="_681dcee3-61b4-4996-870c-5af7cefa6eae" id="sec.99S-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.99S-ssec.2" target.guid="_99a61e6e-971d-4540-8786-98bdd0222553">subsection (2)</intref> does not apply if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_43c55bca-3073-4e0b-8220-bb7e735cc001" id="sec.99S-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the container is not registered; or</txt></block></li><li guid="_4eb8382f-23ca-44a0-9b02-7c42c2fba18f" id="sec.99S-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the refund marking is not displayed on the container; or</txt></block></li><li guid="_5d8d066e-14c4-40af-b961-82ac4e5eed6c" id="sec.99S-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the operator of the container refund point reasonably believes a refund amount has already been paid for the container; or</txt></block></li><li guid="_21324edb-9f47-478f-b513-9e2ffe1826ba" id="sec.99S-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">if the person is required to give the operator a refund declaration under <intref check="valid" refid="sec.99T" target.guid="_a8737675-d7cf-452e-bffe-7022e13b0eb8">section 99T</intref>—the person does not comply with the requirement; or</txt></block></li><li guid="_592d02a1-bc49-46fe-9729-54f9296cbc94" id="sec.99S-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">if a sign at the container refund point states that the operator of the container refund point pays refund amounts in a way other than in cash—the person refuses to accept the refund amount paid in the other way.</txt><note guid="_cbbd84e0-23c3-40c9-a32a-c09fd573ebc0" id="sec.99S-ssec.3-para1.e-note" type="example"><heading guid="_000ba40a-3da8-4348-b0f4-b8071f4cc30b" id="sec.99S-ssec.3-para1.e-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="sec.99V" target.guid="_ad09279d-2b28-40f9-b5a7-dde7753dca10">section 99V</intref> for provisions about the ways the operator of a container refund point may pay refund amounts.</txt></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3167d737-173f-4eb1-b1d2-2a8c0645d92f" id="sec.99S-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">This section does not apply to a container refund point that is a reverse vending machine.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a8737675-d7cf-452e-bffe-7022e13b0eb8" id="sec.99T" provision.type="other" spent.amends="0"><no>99T </no><heading guid="_d7da7e59-cfdd-45f0-a909-6a898208b6fd" id="sec.99T-he">Refund declaration and proof of identity</heading><subclause affected.by.uncommenced="0" guid="_280583e0-9d64-45eb-a960-32a607fe9b27" id="sec.99T-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person who claims a refund amount at a container refund point under <intref check="valid" refid="sec.99S" target.guid="_46ec8d39-f4a9-4e71-86a6-a162e9fc24c3">section 99S</intref> must give the operator of the container refund point a refund declaration if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f9911d46-614f-46c9-b41e-afb95fd3461b" id="sec.99T-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the claim is for a bulk quantity of empty containers and the person has not entered into a bulk claim arrangement with the operator; or</txt></block></li><li guid="_c0239279-1b11-43d4-ac84-3696c501d8cc" id="sec.99T-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the operator asks the person for a refund declaration.</txt></block></li></list><penalty guid="_6ba61b9c-07dd-48a8-805e-a5f150c235bb" id="sec.99T-ssec.1-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></block></subclause><subclause affected.by.uncommenced="0" guid="_4e42d772-8753-486c-bd04-2903bb037bef" id="sec.99T-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A <defterm guid="_8bb3a2a5-96fb-49f9-843d-a09d3bc647ac" id="sec.99T-def.refunddeclaration" type="definition">refund declaration</defterm> is a notice in which a person declares, for the containers for which the person is claiming a refund amount—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_099b64e3-2fd2-4c30-8fa7-7827f0934cf6" id="sec.99T-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the containers were collected in Queensland or a corresponding jurisdiction for the purpose of claiming the refund amount under the scheme or a corresponding scheme; and</txt></block></li><li guid="_73f9612c-198b-4e8f-ba5f-8c2381487af0" id="sec.99T-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that the person reasonably believes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a068457f-61e8-47ea-87e1-e0eafe5e3570" id="sec.99T-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">all the containers display the refund marking; and</txt></block></li><li guid="_72b5dfcf-1139-4676-b3da-0861e0da38e5" id="sec.99T-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">all the containers are registered; and</txt></block></li><li guid="_8b2b8acf-6a80-4f67-915b-bda070576eb0" id="sec.99T-ssec.2-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">a refund amount has not previously been paid for the containers.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_00191531-56b7-4fc5-83fb-491f62315743" id="sec.99T-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A refund declaration must be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_76e6e5d7-a928-454f-b099-d10b3a024268" id="sec.99T-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in the approved form; and</txt></block></li><li guid="_1b2f8631-6976-4d12-a2a7-7965acb32578" id="sec.99T-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">signed by the person making the declaration; and</txt></block></li><li guid="_82e38e40-4d61-4e50-9a9c-eff0c9ebf588" id="sec.99T-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">accompanied by an official document containing the person’s photograph (for example, a passport or driver licence) as proof of the person’s identity.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d1984f6d-9acd-40bb-8bb0-2ea404def3a6" id="sec.99T-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_9309e531-2a50-48fc-857a-4180382dbea3" id="sec.99T-ssec.4-def.bulkclaimarrangement_"><txt break.before="1"><defterm guid="_089770c8-7414-4773-aa43-e2dcee3955d0" id="sec.99T-ssec.4-def.bulkclaimarrangement" type="definition">bulk claim arrangement</defterm>, between a person and the operator of a container refund point, is an arrangement in writing—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b383c6ba-24a8-4b5a-9ca6-2d2e1b91425c" id="sec.99T-ssec.4-def.bulkclaimarrangement-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">under which the operator agrees to accept claims for refund amounts for bulk quantities of empty containers from the person; and</txt></block></li><li guid="_0e68e82e-07eb-4d45-b21b-03371986096b" id="sec.99T-ssec.4-def.bulkclaimarrangement-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that states the person’s obligations under the arrangement in relation to claiming the refund amounts and delivering empty containers to the container refund point.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_62ee2295-a732-4ae2-86f1-c1184ee79639" id="sec.99T-ssec.4-def.bulkquantity_"><txt break.before="1"><defterm guid="_4d7ec5b5-fe1a-4be5-90bc-f8cf734078aa" id="sec.99T-ssec.4-def.bulkquantity" type="definition">bulk quantity</defterm>, of empty containers, means the quantity of containers prescribed by regulation.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_735d4b8b-59a0-4aa8-b2af-1b220e2fc885" id="sec.99U" provision.type="other" spent.amends="0"><no>99U </no><heading guid="_932ae1fa-8aed-45fb-a285-397af1be1d40" id="sec.99U-he">Claiming refund amount from reverse vending machine</heading><subclause affected.by.uncommenced="0" guid="_40a0f5b5-b601-4a10-8d55-25fec4f819b9" id="sec.99U-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person may claim a refund amount for an empty container from a reverse vending machine by placing the container in the machine.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bb59fbe7-be9a-4b2b-9189-0da751c12ecd" id="sec.99U-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A refund amount is paid for the container when the reverse vending machine—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c540a497-0416-4009-b97d-516592c521e8" id="sec.99U-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">accepts the container; and</txt></block></li><li guid="_92710e09-a36f-4d19-a201-30490dc356fc" id="sec.99U-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">dispenses the refund amount for the container in a way mentioned in <intref check="valid" refid="sec.99U-ssec.3" target.guid="_be4963fb-5648-4695-b7be-f07f17373edf">subsection (3)</intref>; and</txt></block></li><li guid="_de9856b9-7e0b-4d72-8642-1b81c253c94d" id="sec.99U-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">gives the person a written record of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d0850af4-f410-4478-838e-f12ef92a24e0" id="sec.99U-ssec.2-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the container accepted; and</txt></block></li><li guid="_544abd23-ab69-4456-99d0-c8a16660e4d2" id="sec.99U-ssec.2-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the refund amount for the container; and</txt></block></li><li guid="_3c870e42-33d7-4faf-9b6d-2ef5ae7a0e07" id="sec.99U-ssec.2-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">how and, if the refund amount was not dispensed to the person, to whom the refund amount was dispensed.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_be4963fb-5648-4695-b7be-f07f17373edf" id="sec.99U-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A refund amount may be dispensed by a reverse vending machine in the following ways—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a6a8dcb8-88bb-4b60-a9a4-9eb79a47d418" id="sec.99U-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to the person claiming the refund amount—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9c8def43-6f04-4589-94f5-01772558cf24" id="sec.99U-ssec.3-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">in cash; or</txt></block></li><li guid="_2ffeafa8-c265-4690-9f48-492dc2b29098" id="sec.99U-ssec.3-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">in another way stated on a sign that is on or near the machine;</txt></block></li></list></block></li><li guid="_df11575d-1248-429a-84cd-398ad2fb59c5" id="sec.99U-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if a sign on or near the machine states that refund amounts for empty containers accepted by the machine are paid to another entity—by paying the amount to the other entity.</txt><note guid="_e6a3878e-17b5-4e78-805b-35892407e735" id="sec.99U-ssec.3-para1.b-note" type="example"><heading guid="_ed2496bd-42dd-453e-8f7d-447cebf6366a" id="sec.99U-ssec.3-para1.b-note-he">Example of an entity refund amounts may be paid to—</heading><block><txt break.before="1">A reverse vending machine raises money for a charity by paying refund amounts to the charity.</txt></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d1a573c4-f419-4cb8-8b53-d817d7185290" id="sec.99U-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A written record may be given under <intref check="valid" refid="sec.99U-ssec.2" target.guid="_bb59fbe7-be9a-4b2b-9189-0da751c12ecd">subsection (2)</intref><intref check="valid" refid="sec.99U-ssec.2-para1.c" target.guid="_de9856b9-7e0b-4d72-8642-1b81c253c94d">(c)</intref> electronically.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_ad09279d-2b28-40f9-b5a7-dde7753dca10" id="sec.99V" provision.type="other" spent.amends="0"><no>99V </no><heading guid="_19a65311-40a8-440c-b4b2-0f75ea4e6537" id="sec.99V-he">Ways refund amount may be paid</heading><subclause affected.by.uncommenced="0" guid="_92c375d0-a56f-41b4-86f2-1948b3f2ac94" id="sec.99V-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a container refund point may pay refund amounts for containers presented at the container refund point—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_021d46f6-4cf4-43c9-9cf7-d3673d3e25ec" id="sec.99V-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in cash or another way; or</txt></block></li><li guid="_cc9d19c5-90f6-4af2-ae26-5e9f053b5319" id="sec.99V-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">in 1 or more ways; or</txt></block></li><li guid="_620dc78d-5065-42bb-9328-87f54f968423" id="sec.99V-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">in different ways for different quantities of containers.</txt></block></li></list><note guid="_0f2980f8-40d1-4202-b1db-145636806b62" id="sec.99V-ssec.1-note" type="example"><heading guid="_15ceaffe-6a9a-4f39-b600-e2dc7e3c66c9" id="sec.99V-ssec.1-note-he">Examples of ways in which refund amounts may be paid—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_8e5b0808-5f06-4758-9e06-af6bb42abefb" id="sec.99V-ssec.1-note-para1" provision.type="other"><no>•</no><block><txt break.before="0">in cash</txt></block></li><li guid="_c65b984c-6d94-4f2f-96eb-acd228cc9906" id="sec.99V-ssec.1-note-para1-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">by electronic funds transfer to a bank account or credit card account</txt></block></li><li guid="_dfe1da7e-0435-4c42-a1f4-598ef4ef621c" id="sec.99V-ssec.1-note-para1-oc.3" provision.type="other"><no>•</no><block><txt break.before="0">as a voucher or card redeemable for cash, goods or services</txt></block></li></list></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_57e1100e-ee44-4eb4-ac23-863809979671" id="sec.99V-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If an operator pays a refund amount other than in cash, the operator must clearly display a sign at the container refund point that states—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_13e4aacb-71e3-464c-88e6-c186ac16b66f" id="sec.99V-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the way the operator pays the refund amount; and</txt></block></li><li guid="_89264b7c-a809-4e2e-b3a8-eb133f646e51" id="sec.99V-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the operator pays the refund amount in different ways for different quantities of containers—the quantities of containers that apply for each different way.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8cc8d475-6fa3-4653-91d6-2875efe1e18e" id="sec.99W" provision.type="other" spent.amends="0"><no>99W </no><heading guid="_45efd44c-94b5-47ac-a1d5-060695ccebaf" id="sec.99W-he">When refund amount must not be claimed</heading><block><txt break.before="1">A person must not claim a refund amount for an empty container at a container refund point if the person knows, or ought reasonably to know—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8bfd56f6-efae-4c61-ac85-9dd9e3ea59ed" id="sec.99W-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a refund amount has already been paid for the container; or</txt></block></li><li guid="_98b32e97-bb2a-4482-b722-376df8ea678e" id="sec.99W-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a recovery amount has been paid to the operator of a material recovery facility for the container.</txt></block></li></list><penalty guid="_0f32b267-1cf4-4ca6-a7e0-61d403e154fa" id="sec.99W-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></block></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_7e49d991-19d8-4ffb-a9db-85a40be7642a" id="ch.4-pt.3B-div.3-sdiv.2"><no>Subdivision 2</no><heading guid="_ef8a5ced-39bb-442f-88e1-b4872cccc3e5" id="ch.4-pt.3B-div.3-sdiv.2-he">Other obligations of container refund point operators</heading><clause affected.by.uncommenced="0" guid="_89e8f011-799d-4424-ba03-47f8adb97e42" id="sec.99X" provision.type="other" spent.amends="0"><no>99X </no><heading guid="_308ba3f1-82ba-4716-9acf-40f833e07ef9" id="sec.99X-he">Obligations of operator of reverse vending machine</heading><subclause affected.by.uncommenced="0" guid="_17c42ee4-67e3-4361-87f7-898caf075de9" id="sec.99X-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the operator of a container refund point that is a reverse vending machine.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1847c2bb-50d2-49f1-aa53-8b97f178a683" id="sec.99X-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The operator must ensure, as far as is reasonably practicable—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0044d494-62d5-421b-a8ee-776d516db5aa" id="sec.99X-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the reverse vending machine is working properly; and</txt></block></li><li guid="_c22e03c6-d598-4c31-9d0f-1c594f286388" id="sec.99X-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the machine is not working properly—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c497c299-e49e-4b0f-ad8b-e2d5a1b18774" id="sec.99X-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the machine is turned off; or</txt></block></li><li guid="_f2ae91f3-c5b9-4dca-999c-6f38f6c53f39" id="sec.99X-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a sign or other method is used to indicate to users the machine is not working properly; and</txt></block></li></list></block></li><li guid="_f9605dbe-0898-4681-921c-309aa7ae5711" id="sec.99X-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the machine does not accept an empty container if the machine is not able to dispense a refund amount for the container; and</txt></block></li><li guid="_5d802ce0-579a-47eb-9a28-739b7dc5f6a8" id="sec.99X-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the machine does not dispense a refund amount for a container if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b3f81b52-d0d9-47be-ac88-3783f42afdf4" id="sec.99X-ssec.2-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the container is not registered; or</txt></block></li><li guid="_21b1365c-a9f3-4ef6-ae1d-5c118b55aa90" id="sec.99X-ssec.2-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the container does not display the refund marking and a barcode for a beverage product; and</txt></block></li></list></block></li><li guid="_eb2352b9-7bff-4ae4-86b7-96dfae283fb1" id="sec.99X-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the following information is clearly displayed on or near the machine—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bb49cddb-e68f-4ebf-8fb7-5f3e4a7589ba" id="sec.99X-ssec.2-para1.e-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the types of container that can be accepted by the machine;</txt></block></li><li guid="_488b3646-3af1-4f6f-a133-091d5e924e87" id="sec.99X-ssec.2-para1.e-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the machine dispenses the refund amount for a container other than in cash—the way the refund amount is dispensed;</txt><note guid="_4b0e49bb-0762-4e4a-bc97-4f027cf52b66" id="sec.99X-ssec.2-para1.e-para2.ii-note" type="example"><heading guid="_a5fd2853-2d58-420b-9310-530a23d7a7b9" id="sec.99X-ssec.2-para1.e-para2.ii-note-he">Examples of ways other than cash in which a refund amount may be dispensed—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_7b48a685-c726-4ac5-94b1-bc81568074fa" id="sec.99X-ssec.2-para1.e-para2.ii-note-para3" provision.type="other"><no>•</no><block><txt break.before="0">issuing a voucher or card redeemable for cash, goods or services</txt></block></li><li guid="_ea105adc-d0bf-4e27-85bc-d4895248c3ee" id="sec.99X-ssec.2-para1.e-para2.ii-note-para3-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">crediting the amount to a bank account or credit card account using electronic funds transfer</txt></block></li></list></block></note></block></li><li guid="_a618911e-5d94-4cd5-af26-d05b6eaf7212" id="sec.99X-ssec.2-para1.e-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">if the refund amount for an empty container is dispensed by being paid to an entity other than the person who claims the refund amount—the entity to whom the refund amount is paid.</txt><note guid="_f9e557d7-8bfe-49eb-8c10-1c0bd40f969d" id="sec.99X-ssec.2-para1.e-para2.iii-note" type="example"><heading guid="_0c7ad4e8-dee7-43f2-a0d6-d41c4c249ddd" id="sec.99X-ssec.2-para1.e-para2.iii-note-he">Example of an entity to whom a refund amount may be paid—</heading><block><txt break.before="1">A reverse vending machine raises money for a charity by paying refund amounts to the charity.</txt></block></note></block></li></list></block></li></list><penalty guid="_a25dabfd-c45a-460b-9afc-ef62c1164146" id="sec.99X-ssec.2-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a6b1ecc0-b9e1-4944-b46e-e1b1c2abb245" id="sec.99Y" provision.type="other" spent.amends="0"><no>99Y </no><heading guid="_e3200316-f6f8-432f-ba0b-c8cb12859244" id="sec.99Y-he">Container refund point operator must keep refund declarations</heading><subclause affected.by.uncommenced="0" guid="_ee13db06-58c4-4e88-8415-374edb87bbe3" id="sec.99Y-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a container refund point must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5cffd1ee-be7a-47f8-932f-c4a83e992a89" id="sec.99Y-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">keep each refund declaration given to the operator for at least 5 years after the declaration was given; and</txt></block></li><li guid="_5d618e96-83d2-4d66-bde3-38eb5f183db6" id="sec.99Y-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for the proof of identity document mentioned in <intref check="valid" refid="sec.99T" target.guid="_a8737675-d7cf-452e-bffe-7022e13b0eb8">section 99T</intref><intref check="valid" refid="sec.99T-ssec.3" target.guid="_00191531-56b7-4fc5-83fb-491f62315743">(3)</intref><intref check="valid" refid="sec.99T-ssec.3-para1.c" target.guid="_82e38e40-4d61-4e50-9a9c-eff0c9ebf588">(c)</intref> that accompanied the declaration—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3faabb53-9298-4355-84e8-bbb1fc1417d3" id="sec.99Y-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">make a copy of the proof of identity document; and</txt></block></li><li guid="_73829fb9-adb0-4762-baf0-59c8c34e069c" id="sec.99Y-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">keep the copy with the declaration for the period mentioned in <intref check="valid" refid="sec.99Y-ssec.1-para1.a" target.guid="_5cffd1ee-be7a-47f8-932f-c4a83e992a89">paragraph (a)</intref>; and</txt></block></li></list></block></li><li guid="_6c8bd86e-47fa-481f-a1c7-68383350c49a" id="sec.99Y-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if asked by an authorised person—produce the declaration and copy of the proof of identity document for inspection by the authorised person.</txt></block></li></list><penalty guid="_917a594c-9246-407d-856d-07a369098698" id="sec.99Y-ssec.1-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></block></subclause><subclause affected.by.uncommenced="0" guid="_1adf071b-11c4-4489-bef7-395247c09b96" id="sec.99Y-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For this section, a document may be made, kept or produced for inspection—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1a1b16de-8e64-4c72-98ea-764a68cb0fbb" id="sec.99Y-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">electronically; or</txt></block></li><li guid="_da1a766b-a054-427a-b159-a2ac4b3129e2" id="sec.99Y-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">by making, keeping or producing for inspection a copy of the document.</txt></block></li></list></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_82c89c80-8922-4d5d-b48a-cf1d0eee76f0" id="ch.4-pt.3B-div.3-sdiv.3"><no>Subdivision 3</no><heading guid="_3b78e4b3-5cd0-4f1d-8c50-985f0dc915e4" id="ch.4-pt.3B-div.3-sdiv.3-he">Container refund points</heading><clause affected.by.uncommenced="0" guid="_2cecbee0-67f4-490a-9429-67a669d0f14f" id="sec.99Z" provision.type="other" spent.amends="0"><no>99Z </no><heading guid="_0884920c-f9ad-425a-a8c4-43ae00e1e7d6" id="sec.99Z-he">Container collection agreement required to operate container refund point</heading><block><txt break.before="1">A person must not operate a container refund point unless a container collection agreement is in force for the container refund point.</txt><penalty guid="_93620f8b-b097-4e0a-b19f-3fb87f1a7233" id="sec.99Z-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></block></clause><clause affected.by.uncommenced="0" guid="_cb8d5a5d-e58b-4067-9dd0-7f33c9c26848" id="sec.99ZA" provision.type="other" spent.amends="0"><no>99ZA </no><heading guid="_414e4ced-4b5d-487c-80ea-90f79c188132" id="sec.99ZA-he">Container collection agreement</heading><subclause affected.by.uncommenced="0" guid="_347ffa6d-0829-4abe-a7ab-8d399f0e2f78" id="sec.99ZA-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A <defterm guid="_0f906356-7be6-4119-a4c2-2db26e124d04" id="sec.99ZA-def.containercollectionagreement" type="definition">container collection agreement</defterm> is a written agreement between the Organisation and the operator of a container refund point that includes provisions about the following matters—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5733e526-6418-40a6-93d2-4291a8734954" id="sec.99ZA-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the operator’s obligations under the agreement in relation to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_97f34e57-c948-48e1-b334-85cde64d0bc7" id="sec.99ZA-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">sorting empty containers and transporting the containers, or arranging for the containers to be transported, to a waste facility for recycling; and</txt></block></li><li guid="_9e1d00cc-8209-414c-9976-895a4abbd6eb" id="sec.99ZA-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">keeping records, and reporting to the Organisation, about the refund amounts paid and containers collected, sorted and transported for recycling by the operator; and</txt></block></li><li guid="_eddf0e60-b407-439b-8ea1-0b42a399b2b4" id="sec.99ZA-ssec.1-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">ensuring the container refund point is accessible to the public, including by operating the container refund point at particular times;</txt></block></li></list></block></li><li guid="_03054eae-c710-4c79-b4e2-7c501a8ffddf" id="sec.99ZA-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the amounts payable to the operator under the agreement for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c040e487-6e0c-4410-8dde-3f4538edffc9" id="sec.99ZA-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">refund amounts paid, or to be paid, by the operator for containers under <intref check="valid" refid="ch.4-pt.3B-div.3-sdiv.1" target.guid="_5e1fac88-c3d7-414d-9e5b-777ba73a2dd1">subdivision 1</intref>; and</txt></block></li><li guid="_e2639b01-5267-4768-a767-2b705ffe3001" id="sec.99ZA-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">handling, sorting and transporting the containers for recycling;</txt></block></li></list></block></li><li guid="_58154cec-6a92-43d1-aa6a-d651000e3a1e" id="sec.99ZA-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">when and how the operator may claim amounts mentioned in <intref check="valid" refid="sec.99ZA-ssec.1-para1.b" target.guid="_03054eae-c710-4c79-b4e2-7c501a8ffddf">paragraph (b)</intref> and when and how the Organisation must pay the amounts;</txt></block></li><li guid="_57a88ab2-9483-4def-88e5-d92f1713fc0e" id="sec.99ZA-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">if the agreement relates to a reverse vending machine—the types of containers to be collected using the machine;</txt></block></li><li guid="_db9494e8-c01b-469e-90bc-dd62c10a9a26" id="sec.99ZA-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">whether the operator may subcontract the operation of the container refund point and the operator’s obligations to the Organisation if the operation is subcontracted;</txt></block></li><li guid="_b63f72aa-c930-4a30-a9cc-49aeee061063" id="sec.99ZA-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">a dispute resolution process for settling disputes between the Organisation and the operator;</txt></block></li><li guid="_84b3f7f6-6fb5-4fc0-942e-addce40724d0" id="sec.99ZA-ssec.1-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">the term of the agreement and when the agreement must be reviewed;</txt></block></li><li guid="_83238f89-5eb4-4f28-9e74-2357388389c1" id="sec.99ZA-ssec.1-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">a process for either party to the agreement to seek an earlier review of the agreement or an amendment to it;</txt></block></li><li guid="_14f0e855-405f-479c-8d1c-3fddfb0214e2" id="sec.99ZA-ssec.1-para1.i" provision.type="other"><no>(i)</no><block><txt break.before="0">other matters prescribed by regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_caa82140-7ddd-43ed-84e4-4e468ce0790e" id="sec.99ZA-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A container collection agreement must also include the standard terms, about a matter mentioned in <intref check="valid" refid="sec.99ZA-ssec.1" target.guid="_347ffa6d-0829-4abe-a7ab-8d399f0e2f78">subsection (1)</intref> or another matter, prescribed by regulation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_afb6baa4-0a74-4cdd-adfe-57251765fc38" id="sec.99ZA-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Organisation must give a person an information notice if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_be571992-8c62-4a31-8993-842d91764b50" id="sec.99ZA-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the person asks the Organisation, in writing, to enter into a container collection agreement for the purpose of the person operating a container refund point; and</txt></block></li><li guid="_50915697-4a30-4f04-a9de-64fce9d434ad" id="sec.99ZA-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Organisation decides not to enter into a container collection agreement with the person.</txt></block></li></list><note guid="_adf66a75-d6b9-426a-ad18-0e53eca6b6f3" id="sec.99ZA-ssec.3-note" type="example"><heading guid="_1105c212-bb52-4b74-a81e-8c00ae13e604" id="sec.99ZA-ssec.3-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="ch.9" target.guid="_f87113fc-b8b5-4d77-bf6d-0ff636dc4f53">chapter 9</intref> for provisions about internal and external reviews for a decision under this subsection.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_aee25d69-7520-4eb0-ba60-5749e4435103" id="sec.99ZA-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">For <intref check="valid" refid="sec.99ZA-ssec.3" target.guid="_afb6baa4-0a74-4cdd-adfe-57251765fc38">subsection (3)</intref>, the Organisation is taken to have decided not to enter into a container collection agreement with a person if the Organisation does not offer, in writing, to enter into an agreement with the person within 20 business days after the person makes the request mentioned in <intref check="valid" refid="sec.99ZA-ssec.3" target.guid="_afb6baa4-0a74-4cdd-adfe-57251765fc38">subsection (3)</intref><intref check="valid" refid="sec.99ZA-ssec.3-para1.a" target.guid="_be571992-8c62-4a31-8993-842d91764b50">(a)</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3f3710bc-b74e-406e-b37d-eec74c64a49b" id="sec.99ZB" provision.type="other" spent.amends="0"><no>99ZB </no><heading guid="_718db854-91ab-4219-b6cd-5e52278c9cb0" id="sec.99ZB-he">Operator of container refund point may claim payment for containers collected</heading><subclause affected.by.uncommenced="0" guid="_8ce4f619-a484-4a7d-b870-343c600c428e" id="sec.99ZB-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a container refund point may claim a collection amount from the Organisation for containers collected by the operator.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_be3273a0-4802-429f-95e0-ae46481c6295" id="sec.99ZB-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"> The claim must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2c5b7820-64a1-43cd-af06-d14d2ed42531" id="sec.99ZB-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the form required by the operator’s container collection agreement; and</txt></block></li><li guid="_4e3801a8-e76c-46dc-815d-f1c854799bd0" id="sec.99ZB-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">be signed by the operator; and</txt></block></li><li guid="_1cbd5c95-f31f-4086-9db6-97b0556be16e" id="sec.99ZB-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">include details of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1544fd2f-ba2d-46a2-be3e-231f82df3778" id="sec.99ZB-ssec.2-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the number of containers the subject of the claim and the amount of the refund amounts paid for the containers; and</txt></block></li><li guid="_d3ee33c5-cb42-442a-8178-3fc0c6b90a6e" id="sec.99ZB-ssec.2-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the waste facility to which the containers were transported for recycling; and</txt></block></li></list></block></li><li guid="_13c3fe35-2891-4a7e-bf15-1e6b2eec736d" id="sec.99ZB-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">be accompanied by the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d6b3c58d-53ff-4468-8f6b-34e04f5cb4cb" id="sec.99ZB-ssec.2-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a declaration that the operator reasonably believes all the containers are registered and display the refund marking;</txt></block></li><li guid="_895077ff-3fdb-4209-a653-27e04b39c515" id="sec.99ZB-ssec.2-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">copies of any refund declarations and proof of identity documents mentioned in <intref check="valid" refid="sec.99T" target.guid="_a8737675-d7cf-452e-bffe-7022e13b0eb8">section 99T</intref><intref check="valid" refid="sec.99T-ssec.3" target.guid="_00191531-56b7-4fc5-83fb-491f62315743">(3)</intref><intref check="valid" refid="sec.99T-ssec.3-para1.c" target.guid="_82e38e40-4d61-4e50-9a9c-eff0c9ebf588">(c)</intref> that relate to the containers;</txt></block></li><li guid="_0d753381-a58b-4196-a2a2-7a6c9fd0b600" id="sec.99ZB-ssec.2-para1.d-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">a notice signed by the operator of the waste facility mentioned in <intref check="valid" refid="sec.99ZB-ssec.2-para1.c" target.guid="_1cbd5c95-f31f-4086-9db6-97b0556be16e">paragraph (c)</intref><intref check="valid" refid="sec.99ZB-ssec.2-para1.c-para2.ii" target.guid="_d3ee33c5-cb42-442a-8178-3fc0c6b90a6e">(ii)</intref> declaring the operator has received the containers for recycling.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d7f55868-95fd-4d3a-8386-470de9ad0686" id="sec.99ZB-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Organisation must pay the collection amount for the containers to the operator as required by the container collection agreement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e2ef1a73-3fc1-4afb-b8cb-050d5e57138f" id="sec.99ZB-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the Organisation decides the collection amount claimed for the containers is not payable to the operator by the container collection agreement, the Organisation must give the operator an information notice for the decision.</txt><note guid="_791f2817-f8b2-434b-9e9f-5af82d89c21a" id="sec.99ZB-ssec.4-note" type="example"><heading guid="_755bc9fa-7962-49e5-9cad-302c5c36519a" id="sec.99ZB-ssec.4-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="ch.9" target.guid="_f87113fc-b8b5-4d77-bf6d-0ff636dc4f53">chapter 9</intref> for provisions about internal and external reviews of a decision under this subsection.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_20ec3f6f-89a2-4090-9a0d-ae861fa593a9" id="sec.99ZB-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">For <intref check="valid" refid="sec.99ZB-ssec.4" target.guid="_e2ef1a73-3fc1-4afb-b8cb-050d5e57138f">subsection (4)</intref>, the Organisation is taken to have decided the collection amount is not payable to the operator under the container collection agreement if the Organisation does not pay the collection amount claimed for the containers within the time required under the agreement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_033e5c65-9e56-4f9f-9b08-1777a45e9701" id="sec.99ZB-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0"><intref check="valid" refid="sec.99ZB-ssec.2" target.guid="_be3273a0-4802-429f-95e0-ae46481c6295">Subsection (2)</intref><intref check="valid" refid="sec.99ZB-ssec.2-para1.c" target.guid="_1cbd5c95-f31f-4086-9db6-97b0556be16e">(c)</intref><intref check="valid" refid="sec.99ZB-ssec.2-para1.c-para2.ii" target.guid="_d3ee33c5-cb42-442a-8178-3fc0c6b90a6e">(ii)</intref> and (d)(iii) does not apply to a container the subject of an extraordinary circumstances exemption.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_367c1da4-8a46-414c-a348-fe6a7e5352ff" id="sec.99ZB-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_4a73d062-ef43-4d9e-8a0b-2cc4ba20cbc2" id="sec.99ZB-ssec.7-def.collectionamount_"><txt break.before="1"><defterm guid="_b57a94a3-b38e-4d1f-99ac-de96ef1cbc0b" id="sec.99ZB-ssec.7-def.collectionamount" type="definition">collection amount</defterm> means an amount payable to the operator under a container collection agreement for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6490f031-dc97-4b57-b6bd-14e65672129f" id="sec.99ZB-ssec.7-def.collectionamount-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">refund amounts paid, or to be paid, by the operator for containers under <intref check="valid" refid="ch.4-pt.3B-div.3-sdiv.1" target.guid="_5e1fac88-c3d7-414d-9e5b-777ba73a2dd1">subdivision 1</intref>; and</txt></block></li><li guid="_2397f2d6-2a28-4966-a82c-918888eb024b" id="sec.99ZB-ssec.7-def.collectionamount-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">handling, sorting and transporting the containers for recycling.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_676517c2-06ad-4dfe-9ac0-8b2a340f59f2" id="sec.99ZC" provision.type="other" spent.amends="0"><no>99ZC </no><heading guid="_35df3111-423f-4252-967e-9a40e4d56cf1" id="sec.99ZC-he">When container refund point operator must not claim payment</heading><subclause affected.by.uncommenced="0" guid="_5bcf435b-36d6-46ea-be77-cf02ce8d4134" id="sec.99ZC-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a container refund point must not claim payment of an amount from the Organisation under a container collection agreement if the payment relates to a container and any of the following apply—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_527a27a7-4e22-410f-9258-3cc52d030fbd" id="sec.99ZC-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the operator has not paid a refund amount for the container;</txt></block></li><li guid="_380c78ac-c282-49de-a278-7d6d4ff57559" id="sec.99ZC-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the container is not registered;</txt></block></li><li guid="_113e84de-d620-4ce0-b131-8a7c1fef23c9" id="sec.99ZC-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the operator knows, or ought reasonably to know, the container has been disposed of to landfill, whether or not the operator has paid a refund amount for the container.</txt></block></li></list><penalty guid="_50d59063-98ee-4541-894f-d240cd4f9852" id="sec.99ZC-ssec.1-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></block></subclause><subclause affected.by.uncommenced="0" guid="_2d594776-bd23-4c84-a174-5a6d83888763" id="sec.99ZC-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.99ZC-ssec.1" target.guid="_5bcf435b-36d6-46ea-be77-cf02ce8d4134">Subsection (1)</intref><intref check="valid" refid="sec.99ZC-ssec.1-para1.c" target.guid="_113e84de-d620-4ce0-b131-8a7c1fef23c9">(c)</intref> does not apply to a container that is the subject of an extraordinary circumstances exemption.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0228d04d-147e-42aa-9cd2-bc16eccacde1" id="sec.99ZD" provision.type="other" spent.amends="0"><no>99ZD </no><heading guid="_be409952-8484-499e-858d-b1dad855173d" id="sec.99ZD-he">Operator must ensure containers sent for recycling</heading><subclause affected.by.uncommenced="0" guid="_838a76ea-e75e-469e-a23b-169c3f00e4c8" id="sec.99ZD-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4fc40be5-a323-4286-9263-1a74f77005f5" id="sec.99ZD-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the operator of a container refund point has paid a refund amount for a container; and</txt></block></li><li guid="_b981c036-a9eb-4626-9c05-cdb5e632c39b" id="sec.99ZD-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the container is not the subject of an extraordinary circumstances exemption.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_93411254-a8a9-4e7b-8e29-eb9535007cf5" id="sec.99ZD-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The operator must not allow the container to be disposed of to landfill.</txt><penalty guid="_4941f857-a2ad-4437-9caf-b068a093abdf" id="sec.99ZD-ssec.2-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></block></subclause></clause></subdivision></division><division affected.by.uncommenced="0" guid="_9d08ba77-4f6b-411a-84e8-93ee4c65eb4c" id="ch.4-pt.3B-div.4"><no>Division 4</no><heading guid="_45e59acd-4670-4b14-9e65-370507b91c12" id="ch.4-pt.3B-div.4-he">Recovery amounts for empty containers recycled by material recovery facilities</heading><clause affected.by.uncommenced="0" guid="_33139e39-0e65-48f1-8900-6123d1482f17" id="sec.99ZE" provision.type="other" spent.amends="0"><no>99ZE </no><heading guid="_9096744d-244b-4762-8fb6-fc40aa180a45" id="sec.99ZE-he">Meaning of <defterm guid="_f25d15c8-07be-4c28-b40f-3aafe45f1b48" type="mention">material recovery facility</defterm></heading><subclause affected.by.uncommenced="0" guid="_f81ea224-bbfc-44e1-a95a-b47edcdc552d" id="sec.99ZE-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A <defterm guid="_7f18047b-4e43-4093-b176-2b74e13189d7" id="sec.99ZE-def.materialrecoveryfacility-oc.2" type="definition">material recovery facility</defterm> is a facility or other place—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1d5bf1ed-f1d1-40c4-a369-b142213cda7e" id="sec.99ZE-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">at which recyclable waste is sorted and prepared for recycling, whether or not the waste is also recycled at the facility or place; or</txt></block></li><li guid="_381c9f55-a82e-4885-98a2-fdebf2e18a1e" id="sec.99ZE-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">of another type prescribed by regulation as a material recovery facility.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f8a4b660-003c-48d2-84bc-523725c501ac" id="sec.99ZE-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, a material recovery facility does not include a facility or other place prescribed by regulation to not be a material recovery facility.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_33938bd0-a5b5-4e5f-aa4b-4d2caff4e5c1" id="sec.99ZF" provision.type="other" spent.amends="0"><no>99ZF </no><heading guid="_7e4ddec3-0716-4067-a214-b4017a5ab149" id="sec.99ZF-he">Material recovery agreement</heading><subclause affected.by.uncommenced="0" guid="_600d67a1-68ca-404e-a411-cfcb83a5b988" id="sec.99ZF-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A <defterm guid="_c6e7a90d-ad23-446c-be0c-d75a3d50b9e5" id="sec.99ZF-def.materialrecoveryagreement" type="definition">material recovery agreement</defterm> is a written agreement between the Organisation and the operator of a material recovery facility about the payment of recovery amounts to the operator for containers the operator sorts and prepares for recycling.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_27c27db3-d7e4-4a62-934a-92ddfd46bb76" id="sec.99ZF-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A material recovery agreement must contain provisions about the following matters—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c664e1a8-1743-42c8-b2b4-04b9ea3b4fee" id="sec.99ZF-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the types of containers the operator sorts and prepares for recycling;</txt></block></li><li guid="_c8089983-63cd-409f-9788-d3f9d64b9744" id="sec.99ZF-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the arrangements the operator has in place for recycling the containers or sending the containers to a waste facility for recycling;</txt></block></li><li guid="_4cd56a40-55ef-4d1d-8f22-9b68b3fe1dd3" id="sec.99ZF-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">whether recovery amounts for quantities of containers will be worked out based on the actual number of containers or the recovery amount protocol;</txt></block></li><li guid="_4bc897ee-a38a-4821-b6b0-044425cf39bc" id="sec.99ZF-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">when and how recovery amounts may be claimed by the operator and will be paid by the Organisation;</txt></block></li><li guid="_bee97f94-d25f-4974-8f5e-495808ed0341" id="sec.99ZF-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">a dispute resolution process for settling disputes between the Organisation and the operator;</txt></block></li><li guid="_1ddc69d5-38d2-4568-83cf-7bc3094a03fa" id="sec.99ZF-ssec.2-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">when the agreement must be reviewed;</txt></block></li><li guid="_422260c2-118a-4cb7-8548-82220ed78175" id="sec.99ZF-ssec.2-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">a process for either party to the agreement to seek an earlier review of the agreement or an amendment to it;</txt></block></li><li guid="_b927095a-55ae-443b-8c4d-09b143224326" id="sec.99ZF-ssec.2-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">other matters prescribed by regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_60bf3f65-8563-4e54-8a93-58218d1fca78" id="sec.99ZF-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A material recovery agreement must also include the standard terms, about a matter mentioned in <intref check="valid" refid="sec.99ZF-ssec.2" target.guid="_27c27db3-d7e4-4a62-934a-92ddfd46bb76">subsection (2)</intref> or another matter, prescribed by regulation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1a6b6ce5-3b9f-492e-b9a2-26ef2e84e18d" id="sec.99ZF-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The Organisation must give the operator of a material recovery facility an information notice if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_962a0a31-6354-440a-9037-46e93b0b7f97" id="sec.99ZF-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the operator asks the Organisation, in writing, to enter into a material recovery agreement for the purpose of claiming recovery amounts for containers; and</txt></block></li><li guid="_8757df25-9a1e-48cb-87bd-2aaeb7633daf" id="sec.99ZF-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Organisation decides not to enter into a material recovery agreement with the operator.</txt></block></li></list><note guid="_4c50f230-98ea-446a-a96a-9e2d05f6e2bb" id="sec.99ZF-ssec.4-note" type="example"><heading guid="_c7d2152c-bf7b-4e5d-b158-5aed21c5a5ed" id="sec.99ZF-ssec.4-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="ch.9" target.guid="_f87113fc-b8b5-4d77-bf6d-0ff636dc4f53">chapter 9</intref> for provisions about internal and external reviews for a decision under this subsection.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_0d0ca6db-c08c-4bde-8514-98470901c0e3" id="sec.99ZF-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">For <intref check="valid" refid="sec.99ZF-ssec.4" target.guid="_1a6b6ce5-3b9f-492e-b9a2-26ef2e84e18d">subsection (4)</intref>, the Organisation is taken to have decided not to enter into a material recovery agreement with the operator of a material recovery facility if the Organisation does not offer, in writing, to enter into an agreement with the operator within 20 business days after the operator makes the request mentioned in <intref check="valid" refid="sec.99ZF-ssec.4" target.guid="_1a6b6ce5-3b9f-492e-b9a2-26ef2e84e18d">subsection (4)</intref><intref check="valid" refid="sec.99ZF-ssec.4-para1.a" target.guid="_962a0a31-6354-440a-9037-46e93b0b7f97">(a)</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_6287134c-07d0-4e2e-855d-b93c296747d0" id="sec.99ZG" provision.type="other" spent.amends="0"><no>99ZG </no><heading guid="_8dfc6cfc-3741-4172-8da5-346e2a1820fe" id="sec.99ZG-he">Meaning of <defterm guid="_2dce73b9-4a9f-4bd3-93d5-9f0ec666562e" id="sec.99ZG-def.recoveryamount" type="definition">recovery amount</defterm></heading><subclause affected.by.uncommenced="0" guid="_77c73fbf-c403-49b2-a702-60accfc42703" id="sec.99ZG-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The <defterm guid="_a8a94593-608b-46fa-a693-1dbfbdd49c87" id="sec.99ZG-def.recoveryamount-oc.2" type="definition">recovery amount</defterm> for a quantity of containers is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e4cb1737-7ddb-4273-a6aa-96b379068b9f" id="sec.99ZG-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the number of containers in the quantity is known—the total of the refund amounts for the number of containers; or</txt></block></li><li guid="_d936d9c6-d41c-497d-804c-41096662b4c3" id="sec.99ZG-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—the amount worked out under the recovery amount protocol for the quantity.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c7b2fadf-ff60-410f-ae08-1c793529988b" id="sec.99ZG-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this part, a recovery amount for a container—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0350cec3-0235-4620-8e94-e818d0f520f5" id="sec.99ZG-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">has been claimed if the container is included in a quantity of containers for which a recovery amount has been claimed; and</txt></block></li><li guid="_ff362ec2-72b7-48e4-bafb-63c1f0f06e10" id="sec.99ZG-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">has been paid if the container is included in a quantity of containers for which a recovery amount has been paid.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b3d0da38-a504-43c2-980a-de3f8d4f45dc" id="sec.99ZH" provision.type="other" spent.amends="0"><no>99ZH </no><heading guid="_f968c8a7-488f-4260-a242-552f43b013e9" id="sec.99ZH-he">Operator of material recovery facility may claim recovery amounts</heading><subclause affected.by.uncommenced="0" guid="_a6833173-0790-4878-8d55-3d8b23bee7a7" id="sec.99ZH-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a material recovery facility may claim the recovery amount for a quantity of containers from the Organisation if the operator—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a36c7426-a58c-4331-ba9b-ffb89cfab1d6" id="sec.99ZH-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">has entered into a material recovery agreement with the Organisation; and</txt></block></li><li guid="_d945e99c-a664-40ab-a531-cef923cee394" id="sec.99ZH-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">has recycled the containers or sent the containers to a waste facility for recycling.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_79920e49-fa3d-46e3-8fc1-f0694a370f9c" id="sec.99ZH-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The claim must be in the form required by the operator’s material recovery agreement and accompanied by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bd95f826-3201-415b-b0f0-4e82c8d1ab28" id="sec.99ZH-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a notice signed by the operator declaring—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_090be907-790c-413b-a66d-c824cb3e3642" id="sec.99ZH-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a refund amount has not been paid for any of the containers in the quantity; and</txt></block></li><li guid="_690ce28f-875e-4896-88af-a88f498332bf" id="sec.99ZH-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the operator has recycled the containers—the operator has recycled the containers; and</txt></block></li></list></block></li><li guid="_4bb3004b-bd92-4e95-9101-3d41df21d3d4" id="sec.99ZH-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the operator has sent the containers to a waste facility for recycling—a notice signed by the operator of the waste facility declaring the operator has received the containers for recycling; and</txt></block></li><li guid="_35263413-60ca-4161-abde-2cd335b030e2" id="sec.99ZH-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the operator is claiming a recovery amount worked out under the recovery amount protocol—evidence the operator has complied with the protocol for claiming the recovery amount.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9792b642-47a9-47e3-8ebd-ed88fc1c60c4" id="sec.99ZH-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Organisation must pay the recovery amount for the quantity of containers to the operator as required under the material recovery agreement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_704d1d0b-092c-44cc-b0ae-d681c59c2c43" id="sec.99ZH-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the Organisation decides the recovery amount claimed for the quantity of containers is not payable under the material recovery agreement, the Organisation must give the operator an information notice for the decision.</txt><note guid="_4e5b69ca-3c64-4325-bed8-70f8c6b589b5" id="sec.99ZH-ssec.4-note" type="example"><heading guid="_bda2aa65-57bc-4d89-a290-afb2b2d67b90" id="sec.99ZH-ssec.4-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="ch.9" target.guid="_f87113fc-b8b5-4d77-bf6d-0ff636dc4f53">chapter 9</intref> for provisions about internal and external reviews of a decision under this subsection.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_00ddee82-dbf4-4d8b-adfb-f19a5397f579" id="sec.99ZH-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">For <intref check="valid" refid="sec.99ZH-ssec.4" target.guid="_704d1d0b-092c-44cc-b0ae-d681c59c2c43">subsection (4)</intref>, the Organisation is taken to have decided the recovery amount is not payable under the material recovery agreement if the Organisation does not pay the recovery amount claimed for a quantity of containers within the time required by the agreement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_57786868-39e7-42b7-94a4-149e2ac4afeb" id="sec.99ZH-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0"><intref check="valid" refid="sec.99ZH-ssec.1" target.guid="_a6833173-0790-4878-8d55-3d8b23bee7a7">Subsections (1)</intref><intref check="valid" refid="sec.99ZH-ssec.1-para1.b" target.guid="_d945e99c-a664-40ab-a531-cef923cee394">(b)</intref> and <intref check="valid" refid="sec.99ZH-ssec.2" target.guid="_79920e49-fa3d-46e3-8fc1-f0694a370f9c">(2)</intref><intref check="valid" refid="sec.99ZH-ssec.2-para1.a" target.guid="_bd95f826-3201-415b-b0f0-4e82c8d1ab28">(a)</intref><intref check="valid" refid="sec.99ZH-ssec.2-para1.a-para2.ii" target.guid="_690ce28f-875e-4896-88af-a88f498332bf">(ii)</intref> and (b) do not apply to containers the subject of an extraordinary circumstances exemption.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_4421410b-1791-4088-b040-7206294f9be8" id="sec.99ZI" provision.type="other" spent.amends="0"><no>99ZI </no><heading guid="_02512387-9d01-4e15-9aef-fdfcba5cbd0b" id="sec.99ZI-he">When material recovery facility operator must not claim recovery amount</heading><subclause affected.by.uncommenced="0" guid="_be9dda71-f136-4d5f-b276-97b01f186746" id="sec.99ZI-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a material recovery facility must not claim the recovery amount for a container if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a5a2787f-18a8-4383-be35-df416c466820" id="sec.99ZI-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a refund amount has been paid for the container at a container refund point; or</txt></block></li><li guid="_6f807195-b723-4fb1-a0b4-63be7c7ae4dc" id="sec.99ZI-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the container is not registered; or</txt></block></li><li guid="_ec104cbc-4436-41a2-97bb-080edbc7dc82" id="sec.99ZI-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the operator has allowed the container to be, or knows the container has been, disposed of to landfill.</txt><note guid="_e5457907-48cf-4520-bb5f-4e1f4d1ae9b5" id="sec.99ZI-ssec.1-para1.c-note" type="example"><heading guid="_a9f7b596-91f5-4668-a6bd-3c494d94c84c" id="sec.99ZI-ssec.1-para1.c-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="sec.99ZX" target.guid="_daeb06c9-5ec4-48ce-b146-6a636f43062e">section 99ZX</intref> for deciding if an operator has allowed a container to be disposed of to landfill.</txt></block></note></block></li></list><penalty guid="_ecf077e3-2d2b-40f8-a1a6-93385c0f3f38" id="sec.99ZI-ssec.1-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></block></subclause><subclause affected.by.uncommenced="0" guid="_981701b2-59bf-474f-b832-3c7a78ed76e7" id="sec.99ZI-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.99ZI-ssec.1" target.guid="_be9dda71-f136-4d5f-b276-97b01f186746">Subsection (1)</intref><intref check="valid" refid="sec.99ZI-ssec.1-para1.c" target.guid="_ec104cbc-4436-41a2-97bb-080edbc7dc82">(c)</intref> does not apply to a container that is the subject of an extraordinary circumstances exemption.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_966d9d83-a2c9-4861-a9a6-7d1ec6b10190" id="sec.99ZJ" provision.type="other" spent.amends="0"><no>99ZJ </no><heading guid="_afbb09a2-1eed-4d78-9f25-d9aa06e642f1" id="sec.99ZJ-he">Operator must not allow containers to become landfill</heading><subclause affected.by.uncommenced="0" guid="_9c7dc316-4e0f-4870-9ac7-64f88c02570f" id="sec.99ZJ-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a material recovery facility must not allow a container to be disposed of to landfill if the operator has received a recovery amount for the container.</txt><penalty guid="_29a42c4b-9e5b-4401-bf70-9bd161b31f17" id="sec.99ZJ-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty><note guid="_378a4f6c-fe89-49e2-9927-cdc60130af63" id="sec.99ZJ-ssec.1-note" type="example"><heading guid="_01a2035f-5442-41bb-b6a4-162ef72d8cab" id="sec.99ZJ-ssec.1-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="sec.99ZX" target.guid="_daeb06c9-5ec4-48ce-b146-6a636f43062e">section 99ZX</intref> for deciding if an operator has allowed a container to be disposed of to landfill.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_d98d688b-87b0-4c6e-9465-0739f1a3ac93" id="sec.99ZJ-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">This section does not apply to a container that is the subject of an extraordinary circumstances exemption.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_9e3b884e-c80f-42a1-910b-6dac15a9c528" id="sec.99ZK" provision.type="other" spent.amends="0"><no>99ZK </no><heading guid="_bf02bd4f-3578-4390-9f54-5661a1e36386" id="sec.99ZK-he">Recovery amount protocol</heading><subclause affected.by.uncommenced="0" guid="_70f37701-5728-4b4d-bdae-499ea00dc9b4" id="sec.99ZK-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A <defterm guid="_3825d430-ce48-49cd-a0f7-cc14e9a098ee" id="sec.99ZK-def.recoveryamountprotocol" type="definition">recovery amount protocol</defterm> is a document, issued by the chief executive, that states the way in which recovery amounts for containers are worked out if the number of containers is not known.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_98472f6b-e34f-4e11-ba83-3ad331ded2fa" id="sec.99ZK-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.99ZK-ssec.1" target.guid="_70f37701-5728-4b4d-bdae-499ea00dc9b4">subsection (1)</intref>, a recovery amount protocol may provide for ways to estimate the number of containers that are intermingled with other recyclable waste, for example—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cf51cc65-88c1-4708-a394-e8d083a805b0" id="sec.99ZK-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">by sampling quantities of recyclable waste that include containers to work out the proportion of the waste that is containers; and</txt></block></li><li guid="_4cc342f4-5d41-45ae-a7be-5b518e1702e6" id="sec.99ZK-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">estimating the number of containers in other quantities of recyclable waste using the proportion worked out from the sampling.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e37f07f4-1142-41d1-b077-36d7d9bb306a" id="sec.99ZK-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A recovery amount protocol is issued by the chief executive by publishing it on the department’s website.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2a8df58f-bbb0-4cdd-b18d-5f1564ac1bd9" id="sec.99ZK-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive must review a recovery amount protocol—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_89aebe77-f29a-44f5-a0b2-5554a0e976ab" id="sec.99ZK-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the Organisation or the operator of a material recovery facility asks the chief executive, in writing, to review the protocol; or</txt></block></li><li guid="_5489ee6e-5bbf-4068-abbf-7e06c4924570" id="sec.99ZK-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">at other times prescribed by regulation.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_55f7d485-6abd-4ce1-897c-a0e4bd5a46b6" id="sec.99ZL" provision.type="other" spent.amends="0"><no>99ZL </no><heading guid="_4eed9ea0-a1cf-40a6-a385-abc2a35b9a49" id="sec.99ZL-he">Operator of material recovery facility must comply with protocol</heading><subclause affected.by.uncommenced="0" guid="_7f30930c-d97b-47e8-95d1-0672f0b6ad55" id="sec.99ZL-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a material recovery agreement provides for the recovery amounts for quantities of containers claimed by the operator of a material recovery facility to be worked out under the recovery amount protocol.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a75a449b-9d72-4e13-ae56-4738d6ad9bf3" id="sec.99ZL-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The operator of the material recovery facility must comply with the recovery amount protocol.</txt><penalty guid="_00c46449-fe31-4435-822c-d39cf47c7ddb" id="sec.99ZL-ssec.2-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_944129c1-82f0-429a-8da5-32e2d5d05a05" id="ch.4-pt.3B-div.5"><no>Division 5</no><heading guid="_5d83423e-9c50-4ea6-a3cb-8d547dfdfe14" id="ch.4-pt.3B-div.5-he">Approved containers for beverage products</heading><subdivision affected.by.uncommenced="0" guid="_e2239f9a-3101-4d7d-9f83-65d63e8ae395" id="ch.4-pt.3B-div.5-sdiv.1"><no>Subdivision 1</no><heading guid="_b27ec5bd-bafe-43ea-853f-99f3ec6c3b58" id="ch.4-pt.3B-div.5-sdiv.1-he">Register of approved containers</heading><clause affected.by.uncommenced="0" guid="_4b65b796-eb3c-44bc-9c13-b04206720dba" id="sec.99ZM" provision.type="other" spent.amends="0"><no>99ZM </no><heading guid="_f07294a8-6ec1-439a-9cbb-d9e68d084576" id="sec.99ZM-he">Organisation must establish and keep register</heading><subclause affected.by.uncommenced="0" guid="_ccc3996c-89dc-40c4-93ca-0a02f8ec53f4" id="sec.99ZM-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Organisation must keep an up-to-date register of approved containers.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6433ac38-d761-42e1-a4dc-b8d3b2e4c800" id="sec.99ZM-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An <defterm guid="_3809c0be-ca2c-4ebd-8376-add57a8c9ea5" id="sec.99ZM-def.approvedcontainer" type="definition">approved container</defterm> is a container for a beverage product for which an approval is in force under—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4022ace3-9aee-423f-b18d-d36dbd3c3b02" id="sec.99ZM-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0"><intref check="valid" refid="ch.4-pt.3B-div.5-sdiv.2" target.guid="_67525d90-e737-43ff-9b6a-b902a80a574c">subdivision 2</intref>; or</txt></block></li><li guid="_6d8ae724-d1c7-4317-a1db-85c9d35f068d" id="sec.99ZM-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a corresponding law for a corresponding scheme.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_325ce269-2f04-426b-a1ca-2a1bbe110bda" id="sec.99ZM-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The register must contain the following details for each approved container and the beverage product packaged in the container—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_253fa68e-11e7-4f48-86c4-d159f9ab7979" id="sec.99ZM-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a description of the beverage product, including the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cba7784e-5ac8-4c5f-950c-0413e4039246" id="sec.99ZM-ssec.3-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the type of beverage in the product;</txt></block></li><li guid="_1623d603-bdc3-47f3-8636-9a42ce52c4b0" id="sec.99ZM-ssec.3-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the volume of beverage in the product;</txt></block></li><li guid="_d02412d1-6b89-4613-8b99-820825fd283a" id="sec.99ZM-ssec.3-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the material the container, including its label, is made of;</txt></block></li></list></block></li><li guid="_5d586fc8-f2b3-4eda-ac2c-73e87b50b682" id="sec.99ZM-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the manufacturer of the beverage product who holds the approval;</txt></block></li><li guid="_63185387-25c5-453c-88b3-cc2657254865" id="sec.99ZM-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the barcode for the beverage product;</txt></block></li><li guid="_138c5255-55eb-4791-a4c2-25fa3b7d38a7" id="sec.99ZM-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">if the approval was granted in a corresponding jurisdiction—the corresponding jurisdiction;</txt></block></li><li guid="_ace199d5-93bf-4655-8ce0-34cd6ba8a638" id="sec.99ZM-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the following days—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_72e0f1e4-f27a-4dd4-89c9-961d547c631d" id="sec.99ZM-ssec.3-para1.e-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the day the approval was granted;</txt></block></li><li guid="_4682a5c3-b3c2-4525-b606-5ca2a22f2360" id="sec.99ZM-ssec.3-para1.e-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the approval has ended—the day the approval ended;</txt></block></li></list></block></li><li guid="_06d46a8f-cc41-42cc-ae9e-bf5d7d3eb651" id="sec.99ZM-ssec.3-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">any conditions of the approval.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d6ae9c37-1d6d-4ee0-9a6b-e7615ea9e761" id="sec.99ZM-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The Organisation may also record in the register any other information the Organisation considers appropriate.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b3f166d7-a1a8-4394-bf97-294f0399c3c4" id="sec.99ZM-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The register must be kept as a searchable, public register.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_67525d90-e737-43ff-9b6a-b902a80a574c" id="ch.4-pt.3B-div.5-sdiv.2"><no>Subdivision 2</no><heading guid="_3de75871-59f9-4b53-b2d4-2124be94af97" id="ch.4-pt.3B-div.5-sdiv.2-he">Applying for container approval</heading><clause affected.by.uncommenced="0" guid="_7e7c5b98-ba6b-4579-a122-bde8eb35f0e9" id="sec.99ZN" provision.type="other" spent.amends="0"><no>99ZN </no><heading guid="_9f5dcb44-3be2-4a43-87a1-6444b9dfa477" id="sec.99ZN-he">Application </heading><block><txt break.before="1">A manufacturer of a beverage may apply to the chief executive for approval of a container for a beverage product (a <defterm guid="_4d0183c4-37fd-46eb-a668-57aa01367bdb" id="def.containerapproval" type="definition">container approval</defterm>).</txt><note guid="_3269a42f-c921-4798-8a5e-f565909ad8f0" id="sec.99ZN-note" type="example"><heading guid="_6301d4d1-aaf4-4822-b21e-b6cb648672f8" id="sec.99ZN-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="ch.8A" target.guid="_7c2636c7-59ac-4241-be5c-684e0ad0e559">chapter 8A</intref> for general provisions that apply to the application and to a container approval.</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_21cf1232-c00b-4926-8b85-743623561349" id="sec.99ZO" provision.type="other" spent.amends="0"><no>99ZO </no><heading guid="_a3c1c6b6-ed21-4020-b721-48869311e490" id="sec.99ZO-he">Particular matters for deciding application</heading><block><txt break.before="1">The chief executive may grant the container approval only if satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f042f20d-b48e-4988-bd8f-0c8d2e004441" id="sec.99ZO-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a container recovery agreement between the Organisation and a manufacturer of the beverage product for the container type used in the product—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_45f5c8e3-fac9-4547-a18e-05804d28855b" id="sec.99ZO-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">is in force; or</txt></block></li><li guid="_42c5e9b5-93bd-4e82-af2c-d5fce15c5dc0" id="sec.99ZO-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">has been agreed in principle by the Organisation pending the approval being granted; and</txt></block></li></list></block></li><li guid="_b89eeabe-bf76-4b2e-b29a-138664ed69a0" id="sec.99ZO-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the container is suitable to be recycled; and</txt></block></li><li guid="_d77933aa-50ce-415f-a3a5-7032d2a21b89" id="sec.99ZO-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the way the refund marking is proposed to be displayed on the container is not likely to affect whether the container is suitable to be recycled; and</txt></block></li><li guid="_3b66684c-ad6c-4c83-8091-86314638350d" id="sec.99ZO-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">approval for the beverage product is not in force under a corresponding law for a corresponding scheme; and</txt></block></li><li guid="_9a2a61b7-8b1d-4405-b2d4-a6a9025ddc41" id="sec.99ZO-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">approval for the beverage product has not been refused or cancelled under a corresponding law for a corresponding scheme.</txt></block></li></list><note guid="_b1a2ef78-f6be-4f26-9715-cd3b061a172b" id="sec.99ZO-note" type="example"><heading guid="_dc902f28-953f-4022-ba70-f9e1861266a6" id="sec.99ZO-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="sec.173V" target.guid="_b182f461-3f03-4099-85a6-2cc35af8bb9a">section 173V</intref> for the general criteria that apply for deciding the application.</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_f0da898b-9319-4e98-a4e2-65a2d15f5e08" id="sec.99ZP" provision.type="other" spent.amends="0"><no>99ZP </no><heading guid="_c08dc184-82f2-4c4f-879c-72641f3da178" id="sec.99ZP-he">Notice of container approval</heading><subclause affected.by.uncommenced="0" guid="_1705c79c-e536-48db-9121-4baefd2698dc" id="sec.99ZP-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the chief executive decides to grant the container approval for a beverage product, the notice given to the manufacturer under <intref check="valid" refid="sec.173W" target.guid="_0630101b-b84d-42e1-b68b-7740561f0928">section 173W</intref> must state the matters mentioned in <intref check="valid" refid="sec.99ZM" target.guid="_4b65b796-eb3c-44bc-9c13-b04206720dba">section 99ZM</intref><intref check="valid" refid="sec.99ZM-ssec.3" target.guid="_325ce269-2f04-426b-a1ca-2a1bbe110bda">(3)</intref> for the beverage product.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_362652c8-c057-4aa5-bec3-915a40b505c7" id="sec.99ZP-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive must give a copy of the notice about the decision to the Organisation within 10 business days after making the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2bc10498-f260-42ff-9afb-4ab8c080d9d1" id="sec.99ZQ" provision.type="other" spent.amends="0"><no>99ZQ </no><heading guid="_4205d769-aec1-4bd6-8762-0161581896b0" id="sec.99ZQ-he">Conditions of container approval</heading><subclause affected.by.uncommenced="0" guid="_1610ba4a-a016-4728-b6dd-e7ec8041a5fe" id="sec.99ZQ-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">It is a condition of a container approval that the holder must give the Organisation notice about any changes to the beverage product the subject of the approval, including, for example—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f00fba4f-eddb-42b0-9343-02b672fca570" id="sec.99ZQ-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the type of beverage in the product; or</txt></block></li><li guid="_b540fe6b-6145-4c71-82e7-df8e7fabe84a" id="sec.99ZQ-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the volume of beverage in the product; or</txt></block></li><li guid="_9766c033-30ab-4677-948b-dd213c433c7f" id="sec.99ZQ-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the material the container, including its label, is made of.</txt></block></li></list><note guid="_94d7734b-d8d7-4617-805e-b1b9b484c10b" id="sec.99ZQ-ssec.1-note" type="example"><heading guid="_f6ea0c24-bfc7-4a8c-9f9e-6d2e79bf5a71" id="sec.99ZQ-ssec.1-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="sec.173X" target.guid="_f06fadca-f26b-481a-a66b-fc99e9cc1aee">section 173X</intref> for the chief executive’s general power to impose conditions on a container approval.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_00dec183-f6b4-49cd-a2fc-52f39a56d0bd" id="sec.99ZQ-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The holder of a container approval must comply with the conditions of the approval.</txt><penalty guid="_bde9b27e-05da-4d1d-9b5d-0e91c6d1daca" id="sec.99ZQ-ssec.2-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3cffbb09-f6f7-4c95-89de-f71ffbe2ed6f" id="sec.99ZR" provision.type="other" spent.amends="0"><no>99ZR </no><heading guid="_fbf6ab5b-7f76-448f-9dad-8b0c16b98ab4" id="sec.99ZR-he">Container approval continues in force</heading><subclause affected.by.uncommenced="0" guid="_f6012702-58ff-40a0-8ac7-e87f96811ca7" id="sec.99ZR-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A container approval continues in force until the approval is cancelled or surrendered.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fec00cf2-e686-4ecc-af06-0a5b2250ee5d" id="sec.99ZR-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if a container approval is suspended, the approval does not have effect for the period of the suspension.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c61ad58e-c1f3-479d-8527-f05589875961" id="sec.99ZR-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Despite <intref check="valid" refid="sec.99ZR-ssec.1" target.guid="_f6012702-58ff-40a0-8ac7-e87f96811ca7">subsections (1)</intref> and <intref check="valid" refid="sec.99ZR-ssec.2" target.guid="_fec00cf2-e686-4ecc-af06-0a5b2250ee5d">(2)</intref>, a person, other than a manufacturer of a beverage product the subject of the container approval, does not commit an offence against this part—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e8b2310a-b4f4-4178-8e4e-1ace664349a7" id="sec.99ZR-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the container used for the beverage product is no longer registered because the container approval has been cancelled or surrendered, or is suspended; and</txt></block></li><li guid="_e5edd2ad-1d94-47f5-befd-4a8ea22449d1" id="sec.99ZR-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">merely because the container used for the product is not registered.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_9a133a3e-5d17-45e0-b55e-9fd379835871" id="sec.99ZS" provision.type="other" spent.amends="0"><no>99ZS </no><heading guid="_04eb3b17-6f0b-4e1a-95fe-12c9d0212aa9" id="sec.99ZS-he">Applying to amend container approval</heading><subclause affected.by.uncommenced="0" guid="_e233213c-9b15-491f-a60e-de33d17c888a" id="sec.99ZS-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The holder of a container approval for a beverage product may apply to the chief executive to amend the approval, including a condition of the approval.</txt><note guid="_db78f323-38e5-4722-b47a-1797d3eafbf3" id="sec.99ZS-ssec.1-note" type="example"><heading guid="_d05818c9-74e9-43a0-b417-5adc9a7ad6e3" id="sec.99ZS-ssec.1-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="ch.8A" target.guid="_7c2636c7-59ac-4241-be5c-684e0ad0e559">chapter 8A</intref>, <intref check="valid" refid="ch.8A-pt.2" target.guid="_38a8cf7c-f387-4459-86c3-7f550cc798c5">part 2</intref> for general provisions that apply to the application.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_c2e126a0-6668-4b16-8bfc-2671a22136e0" id="sec.99ZS-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.99ZS-ssec.1" target.guid="_e233213c-9b15-491f-a60e-de33d17c888a">subsection (1)</intref>, the holder may apply to amend—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8af47bfd-6047-4db9-9250-92359104a796" id="sec.99ZS-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the type of beverage in the beverage product; or</txt></block></li><li guid="_61ef0a1b-7dea-4591-884e-16662fcae8d6" id="sec.99ZS-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the volume of beverage in the product; or</txt></block></li><li guid="_5a79687a-999f-4ca4-96f2-1869c9259ff4" id="sec.99ZS-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the material the container, including its label, is made of.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_94d6c567-29fa-4924-8f0d-4ab44d0514f9" id="sec.99ZT" provision.type="other" spent.amends="0"><no>99ZT </no><heading guid="_abf2e134-973f-4d26-80dc-113616dbe009" id="sec.99ZT-he">Deciding amendment application</heading><subclause affected.by.uncommenced="0" guid="_824f7c57-065c-44a0-84f2-1f08ef9c7dc0" id="sec.99ZT-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the chief executive is deciding whether or not to amend a container approval—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d5ffa6ca-585b-4fa7-b5b3-88c4afc94528" id="sec.99ZT-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">on an application made under <intref check="valid" refid="sec.99ZS" target.guid="_9a133a3e-5d17-45e0-b55e-9fd379835871">section 99ZS</intref>; or</txt></block></li><li guid="_0df59e8c-7d5b-41ca-b5be-36359980cede" id="sec.99ZT-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">after giving the holder of the approval a show cause notice about a proposed amendment under <intref check="valid" refid="sec.173ZB" target.guid="_e5c5f579-dad9-46e8-9371-bae7a3151605">section 173ZB</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_174c7da8-01b1-4f4a-94f4-c800cbf90ecf" id="sec.99ZT-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.99ZO" target.guid="_21cf1232-c00b-4926-8b85-743623561349">Section 99ZO</intref> applies as if the decision were a decision about whether to grant the container approval.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_96190098-f09a-443b-83ca-aee59e24804f" id="sec.99ZU" provision.type="other" spent.amends="0"><no>99ZU </no><heading guid="_1ff754b6-e847-4add-89e1-39750af0b149" id="sec.99ZU-he">Applying to transfer container approval</heading><subclause affected.by.uncommenced="0" guid="_ef36bd53-21d0-49a6-99dc-a462751ed413" id="sec.99ZU-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The holder of a container approval may apply to the chief executive to transfer the approval to another person.</txt><note guid="_6122bb97-d513-4ab2-b2b9-31c391e3ec56" id="sec.99ZU-ssec.1-note" type="example"><heading guid="_d09bffb7-0cd9-43ba-8b02-f44e6fffc390" id="sec.99ZU-ssec.1-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="ch.8A" target.guid="_7c2636c7-59ac-4241-be5c-684e0ad0e559">chapter 8A</intref>, <intref check="valid" refid="ch.8A-pt.2" target.guid="_38a8cf7c-f387-4459-86c3-7f550cc798c5">part 2</intref> for general provisions that apply to the application.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_ad23878b-91aa-400d-9e46-2903d98f7303" id="sec.99ZU-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application must be accompanied by the signed consent of the proposed transferee.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3c516b03-4b4e-49cb-a7aa-ef788c7ff166" id="sec.99ZU-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The period for deciding the application is 10 business days.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_736c2bf3-828b-409e-8ab7-6b081838712e" id="sec.99ZU-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the chief executive decides to grant the application, the chief executive must, in addition to the notice under <intref check="valid" refid="sec.173W" target.guid="_0630101b-b84d-42e1-b68b-7740561f0928">section 173W</intref>, give a notice about the decision to the proposed transferee and the Organisation within 5 business days after making the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_420c6856-3d7a-4e78-9ea7-baf7e9ef2b52" id="sec.99ZV" provision.type="other" spent.amends="0"><no>99ZV </no><heading guid="_0becd0c2-16fd-48be-8ea7-d90460a35cee" id="sec.99ZV-he">Grounds for suspending or cancelling container approval</heading><block><txt break.before="1">Each of the following is a ground for suspending or cancelling a container approval for a beverage product—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bbd207f0-b345-4b08-988b-5986e8fc39a8" id="sec.99ZV-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a container recovery agreement for the type of container for the beverage product is not, or is no longer, in force between the Organisation and a manufacturer of the product;</txt></block></li><li guid="_2ec61023-bc3c-40ae-a231-e48f0749ca67" id="sec.99ZV-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the container is not, or is no longer, suitable to be recycled;</txt></block></li><li guid="_c75fe1e5-67ef-432c-b007-68c60706d550" id="sec.99ZV-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the way the refund marking is proposed to be displayed on the container affects, or is likely to affect, whether the container can be recycled;</txt></block></li><li guid="_93efbb96-7ee6-4cf3-b621-d09229855329" id="sec.99ZV-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the container for the beverage product is no longer a container under the scheme;</txt></block></li><li guid="_5f73766c-e9e7-4f0c-b4c8-16fc8c478d2c" id="sec.99ZV-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the beverage in the beverage product is no longer a beverage under the scheme.</txt></block></li></list><note guid="_8d8fe9ef-da56-432d-94b7-d4d62071c19d" id="sec.99ZV-note" type="example"><heading guid="_ec91ce64-0eb1-47c6-b033-6f05d76c748a" id="sec.99ZV-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="ch.8A" target.guid="_7c2636c7-59ac-4241-be5c-684e0ad0e559">chapter 8A</intref>, <intref check="valid" refid="ch.8A-pt.3" target.guid="_e228dabb-d438-407a-ae32-586d89e13499">part 3</intref> for general provisions that apply for suspending or cancelling a container approval.</txt></block></note></block></clause></subdivision></division><division affected.by.uncommenced="0" guid="_dcc7ceb8-480c-406b-ba0f-c855041bd6c4" id="ch.4-pt.3B-div.6"><no>Division 6</no><heading guid="_50d34387-8071-408d-8819-d39b79dd8d9a" id="ch.4-pt.3B-div.6-he">Miscellaneous</heading><clause affected.by.uncommenced="0" guid="_8e8c32f2-5159-412b-9d4c-00a39dbb132f" id="sec.99ZW" provision.type="other" spent.amends="0"><no>99ZW </no><heading guid="_3ee57fe3-8a48-47c9-a35b-9a568f1bfdac" id="sec.99ZW-he">Inconsistent provision has no effect</heading><block><txt break.before="1">A provision of any of the following agreements has no effect to the extent the provision is inconsistent with this Act—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5b161518-3c1c-4322-a135-b84b68e5a04c" id="sec.99ZW-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a container recovery agreement;</txt></block></li><li guid="_11dd9389-18af-4709-ad7c-dbda04f90a79" id="sec.99ZW-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a container collection agreement;</txt></block></li><li guid="_5dca9243-065f-43d7-98ed-fe9f42e35511" id="sec.99ZW-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a material recovery agreement.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_daeb06c9-5ec4-48ce-b146-6a636f43062e" id="sec.99ZX" provision.type="other" spent.amends="0"><no>99ZX </no><heading guid="_84dea3b9-0846-44d8-94bc-a7672e87e9aa" id="sec.99ZX-he">Disposal of containers to landfill</heading><subclause affected.by.uncommenced="0" guid="_9345df93-6e48-43bc-a189-e6f38bb77010" id="sec.99ZX-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies for deciding, for this part, whether a person has disposed of, or allowed the disposal of, a container to landfill.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_362325e0-d061-4993-bb1a-bbd9cc880552" id="sec.99ZX-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A person has allowed a container to be disposed of to landfill if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2e73068c-60b6-4cec-9710-5e1e4ac66fe4" id="sec.99ZX-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the person arranged for the container to be taken to a waste facility for recycling; and</txt></block></li><li guid="_193a54e3-a2ef-449f-b767-f0a519b8e0b0" id="sec.99ZX-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">when the person made the arrangement, the person knew, or ought reasonably to have known, the operator of the waste facility was likely to dispose of, or allow the disposal of, the container to landfill; and</txt></block></li><li guid="_3fde0964-eb52-488e-9772-376bd23d2802" id="sec.99ZX-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the container is disposed of to landfill.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0b3859b4-7982-4da0-8b0f-1ac2b0deb935" id="sec.99ZX-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A person has not disposed of, or allowed the disposal of, a container to landfill if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5dee09e2-04e4-4a23-b688-df5d6caa54aa" id="sec.99ZX-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the person arranged for the container to be taken to a waste facility at which containers of that type can be recycled; and</txt></block></li><li guid="_7780d4c3-ad88-4967-9149-c5623935d91b" id="sec.99ZX-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">part of the container can not be recycled at the waste facility; and</txt></block></li><li guid="_51c5b9c2-160a-4a61-9041-eeaf5194b3e4" id="sec.99ZX-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that part of the container is disposed of to landfill.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b4d1a6a6-a697-42d1-a1bc-476371e55f3e" id="sec.99ZY" provision.type="other" spent.amends="0"><no>99ZY </no><heading guid="_67e0b272-b8b7-4c02-8adf-ed1b88582522" id="sec.99ZY-he">Extraordinary circumstances exemption</heading><subclause affected.by.uncommenced="0" guid="_93dff67e-0ed2-47fb-af5e-63fde1129b32" id="sec.99ZY-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a container has become unsuitable to be recycled because of extraordinary circumstances.</txt><note guid="_fa692798-6d31-4efa-b731-b3fa37429a3b" id="sec.99ZY-ssec.1-note" type="example"><heading guid="_b53845ad-3b77-4592-8154-5c0ae54bbe1e" id="sec.99ZY-ssec.1-note-he">Example—</heading><block><txt break.before="1">The container becomes contaminated when the place at which the container is stored is inundated by water from a flooded river during a severe storm.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_fcb1f25d-6213-42f0-93bb-4dcede99f86c" id="sec.99ZY-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The operator of a container refund point or material recovery facility may apply to the chief executive for an exemption (an <defterm guid="_28a6db09-9462-4d58-89c5-bd206b38c288" id="sec.99ZY-def.extraordinarycircumstancesexemption" type="definition">extraordinary circumstances exemption</defterm>) from the requirements under this part to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7c8efa6a-9d86-42e9-9485-731802f2d928" id="sec.99ZY-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">recycle the container or send the container to be recycled; and</txt></block></li><li guid="_2c1ca4f1-1439-4b8d-a15a-b7ae04face49" id="sec.99ZY-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">not allow the container to be disposed of to landfill.</txt></block></li></list><note guid="_722b84e7-8dd0-42c1-9124-01631c6dc7d4" id="sec.99ZY-ssec.2-note" type="example"><heading guid="_95139f3d-8a4f-4e73-9694-b7260323afdf" id="sec.99ZY-ssec.2-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="ch.8A" target.guid="_7c2636c7-59ac-4241-be5c-684e0ad0e559">chapter 8A</intref> for general provisions that apply to the application and an extraordinary circumstances exemption.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_38492790-3ead-46d2-8c74-0a9fb5f356e8" id="sec.99ZY-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive may grant the exemption if satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bf260874-9199-4071-9e8d-359a1523b54a" id="sec.99ZY-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the container has become unsuitable to be recycled; and</txt></block></li><li guid="_612fbca9-4c2b-44ee-991d-495d6de63c57" id="sec.99ZY-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the circumstances that caused the container to become unsuitable to be recycled were extraordinary and either—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2e57b4df-1e32-416f-bbc3-6f5e626bb253" id="sec.99ZY-ssec.3-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">could not have reasonably been foreseen; or</txt></block></li><li guid="_8ba4055c-a67e-4b7d-9034-5e4bbe646cb6" id="sec.99ZY-ssec.3-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">were beyond the operator’s control.</txt></block></li></list></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_80d74fb4-bc77-48c0-8630-3fe68bc95ec4" id="sec.99ZZ" provision.type="other" spent.amends="0"><no>99ZZ </no><heading guid="_b5022e7e-28b5-489b-b9fd-c7944a0e9d0a" id="sec.99ZZ-he">Authorisations for competition legislation</heading><subclause affected.by.uncommenced="0" guid="_8d5e2d0d-3d09-405f-ad7c-de4aeb9894fe" id="sec.99ZZ-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The following things are specifically authorised for competition legislation—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_502834df-c36d-466a-a89b-253ac1e4e10c" id="sec.99ZZ-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">appointing, under <intref check="valid" refid="ch.4-pt.5" target.guid="_f76bac62-fb51-496d-9f22-9cbcfa27127c">part 5</intref>, a company to administer the scheme;</txt></block></li><li guid="_b3dd5fa9-0b68-48dd-b211-49adf6efc3d7" id="sec.99ZZ-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">granting, amending, transferring, suspending, cancelling or surrendering a container approval;</txt></block></li><li guid="_55986455-86c3-4130-97d3-781d7980402d" id="sec.99ZZ-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a container collection agreement;</txt></block></li><li guid="_89b455f4-6c65-4ebe-926a-4d681452aadf" id="sec.99ZZ-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a container recovery agreement;</txt></block></li><li guid="_4c235094-7890-490f-ac63-61b783a4b940" id="sec.99ZZ-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">a material recovery agreement;</txt></block></li><li guid="_d8313d58-f4ec-475b-a8c7-34c38e93b4e1" id="sec.99ZZ-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">the conduct of a person negotiating, entering into and performing an agreement mentioned in <intref check="valid" refid="sec.99ZZ-ssec.1-para1.c" target.guid="_55986455-86c3-4130-97d3-781d7980402d">paragraph (c)</intref>, <intref check="valid" refid="sec.99ZZ-ssec.1-para1.d" target.guid="_89b455f4-6c65-4ebe-926a-4d681452aadf">(d)</intref> or <intref check="valid" refid="sec.99ZZ-ssec.1-para1.e" target.guid="_4c235094-7890-490f-ac63-61b783a4b940">(e)</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0198a66d-56af-4d08-8933-babf7b17ac5c" id="sec.99ZZ-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Anything authorised to be done by <intref check="valid" refid="sec.99ZZ-ssec.1" target.guid="_8d5e2d0d-3d09-405f-ad7c-de4aeb9894fe">subsection (1)</intref> is authorised only to the extent to which it would otherwise contravene the <legref check="invalid" jurisd="CTH" type="act"><name emphasis="yes">Competition and Consumer Act 2010</name> (Cwlth)</legref> or the Competition Code of Queensland.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_804d6b6a-23b0-4fca-8dd9-6667f9805f79" id="sec.99ZZ-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_ec4b4d57-2953-4e82-a754-b8021effd1fe" id="sec.99ZZ-ssec.3-def.competitionlegislation_"><txt break.before="1"><defterm guid="_69793960-02a8-4dfc-ba6f-9fa3755adb90" id="sec.99ZZ-ssec.3-def.competitionlegislation" type="definition">competition legislation</defterm> means the <legref check="invalid" jurisd="CTH" type="act"><name emphasis="yes">Competition and Consumer Act 2010</name> (Cwlth)</legref>, <legref check="invalid" jurisd="CTH" refid="sec.51" type="act">section 51</legref><legref check="invalid" jurisd="CTH" refid="sec.51-ssec.1" type="act">(1)</legref><legref check="invalid" jurisd="CTH" refid="sec.51-ssec.1-para1.b" type="act">(b)</legref> or the <legref check="invalid" jurisd="QLD" type="act"><name emphasis="no">Competition Code of Queensland</name></legref>, <legref check="invalid" jurisd="QLD" refid="sec.51" type="act">section 51</legref>.</txt></definition></deflist></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_ebdf7d72-9903-4afb-aa2b-6e92c0dda49b" id="ch.4-pt.4"><no>Part 4</no><heading guid="_a47f79cf-851f-402b-88dd-42ef4bb2c291" id="ch.4-pt.4-he">Disposal bans</heading><clause affected.by.uncommenced="0" guid="_0c056a98-dfe3-457a-b1f0-ad6778604f22" id="sec.100" provision.type="other" spent.amends="0"><no>100</no><heading guid="_1510bd18-b4c4-465e-ad0d-2ea183c1891c" id="sec.100-he">Application of this part</heading><subclause affected.by.uncommenced="0" guid="_6547f155-509c-435b-9560-7e695e95c78b" id="sec.100-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This part applies to waste only if a regulation has identified the waste for the purposes of this part.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fc3792ce-07a2-4666-b217-7fb0dc1208ed" id="sec.100-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.100-ssec.1" target.guid="_6547f155-509c-435b-9560-7e695e95c78b">subsection (1)</intref>, waste may be identified according to its type.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fd0181c4-9b4f-422f-b7cc-56087ea02960" id="sec.100-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">This part does not apply to waste excluded under a regulation from the operation of this part.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f9b3e9d2-bf81-4c1e-8f6a-e90350469767" id="sec.100-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Waste to which this part applies is <defterm guid="_e3cc4d27-47ed-4f2a-8bba-8b98985a8f42" id="sec.100-def.disposalbanwaste" type="definition">disposal ban waste</defterm>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2235935f-e276-4573-ac77-6388955d7507" id="sec.101" provision.type="other" spent.amends="0"><no>101</no><heading guid="_58d665d2-a9dc-424a-ad5c-9915e6bc3893" id="sec.101-he">Prohibition on disposal of disposal ban waste</heading><block><txt break.before="1">The operator of a waste facility who is required to hold an environmental authority in relation to the disposal of waste at the facility must not dispose of disposal ban waste at the facility.</txt></block><penalty guid="_2565c7b9-ca88-43e4-9557-e2c60881765d" id="sec.101-pen"><block><txt break.before="1">Maximum penalty—1,000 penalty units.</txt></block></penalty></clause><clause affected.by.uncommenced="0" guid="_9ff22dd5-f239-4aa3-99e3-3627dae994a8" id="sec.102" provision.type="other" spent.amends="0"><no>102</no><heading guid="_78430baa-3d1d-47ad-b398-b9e18940e15c" id="sec.102-he">Considerations for prescribing waste as disposal ban waste</heading><subclause affected.by.uncommenced="0" guid="_d610be0a-6540-4c0f-b2eb-69e59b3e71f0" id="sec.102-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may recommend to the Governor in Council the making of a regulation that identifies waste for the purposes of this part only after considering all of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5fb15f01-3afc-4260-aaea-b6e97182df66" id="sec.102-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">whether prohibition on the disposal of the waste is the most effective point of intervention in the life cycle of the waste;</txt></block></li><li guid="_fe133438-aa05-4a9c-9cc1-d191c964a7a7" id="sec.102-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether there are viable existing or potential collection systems and markets for any benefit that may be obtained from not disposing of the waste;</txt></block></li><li guid="_47db6607-0d85-4835-a426-61cabafe2d58" id="sec.102-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">whether the costs of monitoring, enforcement and market development are proportional to the benefits;</txt></block></li><li guid="_f190b154-02fe-41e0-87ae-72ad66b6f4e4" id="sec.102-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">whether voluntary or other measures for the avoidance of disposal have been shown not to be effective;</txt></block></li><li guid="_2a722086-b695-4f08-8ae3-58b58c3ef1d0" id="sec.102-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">whether a prohibition on disposal is required to support an accredited product stewardship scheme, a regulated product stewardship scheme or an approved program.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_40e34a92-ea06-405e-a2eb-5687653c30aa" id="sec.102-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister, in considering the matters mentioned in <intref check="valid" refid="sec.102-ssec.1" target.guid="_d610be0a-6540-4c0f-b2eb-69e59b3e71f0">subsection (1)</intref>, may consult with any expert reference group or other entity the Minister considers appropriate.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_f76bac62-fb51-496d-9f22-9cbcfa27127c" id="ch.4-pt.5"><no>Part 5</no><heading guid="_6bd93049-67db-4d7e-860f-eac5639576b9" id="ch.4-pt.5-he">Product Responsibility Organisation</heading><division affected.by.uncommenced="0" guid="_0bd73268-a96a-4a2a-90f0-1ec68633e454" id="ch.4-pt.5-div.1"><no>Division 1</no><heading guid="_f60590ff-952f-47e3-a2d5-33dd711a3c58" id="ch.4-pt.5-div.1-he">Appointment and powers</heading><clause affected.by.uncommenced="0" guid="_3b9ed13f-3b1c-4496-ba4d-9de542e481d3" id="sec.102A" provision.type="other" spent.amends="0"><no>102A </no><heading guid="_eec22876-3d64-4d56-833a-d53f4b8b8c53" id="sec.102A-he">Appointment</heading><block><txt break.before="1">The Minister may, under this part, appoint an eligible company as the Product Responsibility Organisation for the container refund scheme.</txt></block></clause><clause affected.by.uncommenced="0" guid="_aef67fde-2881-4048-b064-2d7a4ab25d9c" id="sec.102B" provision.type="other" spent.amends="0"><no>102B </no><heading guid="_c3a1b9ba-a40f-4c2a-8ecb-a9b4cf7f2cc9" id="sec.102B-he">Meaning of <defterm guid="_cb0c266d-56d3-4fab-b3b4-8eb9322d9e1f" type="mention">eligible company</defterm></heading><subclause affected.by.uncommenced="0" guid="_ec8ecb4f-b22b-426a-b2b5-dbf602137f05" id="sec.102B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An <defterm guid="_f59899a4-40d4-4cd6-a2ac-4f88335364e6" id="sec.102B-def.eligiblecompany-oc.2" type="definition">eligible company</defterm> is a company that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_86e21a96-757f-46e8-87df-4e52aaa35c10" id="sec.102B-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is registered under the <legref check="invalid" jurisd="CTH" type="act"><name emphasis="no">Corporations Act</name></legref>; and</txt></block></li><li guid="_74a3dfdf-8e3e-4f8b-9c44-5f57182045d6" id="sec.102B-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is carried on other than for the profit or gain of its individual members; and</txt></block></li><li guid="_e83872dc-b5b2-40fa-a5ae-56b4df32206d" id="sec.102B-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">has a constitution that, at all times—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fd660246-a669-4263-8e05-c002c061e027" id="sec.102B-ssec.1-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">requires the company to maintain a board, constituted by 9 directors, that has the composition required under <intref check="valid" refid="sec.102B-ssec.2" target.guid="_b531a072-1233-408a-b091-c4dec47217a3">subsection (2)</intref>; and</txt></block></li><li guid="_7b8c276a-a375-4fb4-b4e3-8e02651b1c5f" id="sec.102B-ssec.1-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">prohibits dividends being paid to, or the income, profits or assets of the company being distributed among, its members; and</txt></block></li><li guid="_079c7c3d-e4ef-415a-a18f-1e796aa58390" id="sec.102B-ssec.1-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">requires the persons appointed or employed as executive officers of the company to be eligible individuals; and</txt></block></li><li guid="_c82e673a-0c5a-48fe-aba4-6114bee16ee8" id="sec.102B-ssec.1-para1.c-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">includes provisions about—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_550df7b8-a621-4543-abaf-ffdf1a928ec9" id="sec.102B-ssec.1-para1.c-para2.iv-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">the way the chair and directors are appointed and removed; and</txt></block></li><li guid="_5e35265c-4383-47c1-b3ec-cb55046fe478" id="sec.102B-ssec.1-para1.c-para2.iv-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">the way the chair and directors vote on and decide matters; and</txt></block></li><li guid="_0172e2ba-cc4f-481a-81ee-1ea5e71dac68" id="sec.102B-ssec.1-para1.c-para2.iv-para3.C" provision.type="other"><no>(C)</no><block><txt break.before="0">the remuneration and other entitlements of the chair and directors; and</txt></block></li><li guid="_c195f4ec-0b3d-41c7-a105-6a30d11dbae1" id="sec.102B-ssec.1-para1.c-para2.iv-para3.D" provision.type="other"><no>(D)</no><block><txt break.before="0">the way the constitution is amended; and</txt></block></li><li guid="_b21ccd38-5555-483b-852e-d2c315f2d326" id="sec.102B-ssec.1-para1.c-para2.iv-para3.E" provision.type="other"><no>(E)</no><block><txt break.before="0">another matter prescribed by regulation.</txt></block></li></list></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b531a072-1233-408a-b091-c4dec47217a3" id="sec.102B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.102B-ssec.1" target.guid="_ec8ecb4f-b22b-426a-b2b5-dbf602137f05">subsection (1)</intref><intref check="valid" refid="sec.102B-ssec.1-para1.c" target.guid="_e83872dc-b5b2-40fa-a5ae-56b4df32206d">(c)</intref><intref check="valid" refid="sec.102B-ssec.1-para1.c-para2.i" target.guid="_fd660246-a669-4263-8e05-c002c061e027">(i)</intref>, the required composition of the board is as follows—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a052cb63-483b-4b8d-9ce5-d52d3cbb329f" id="sec.102B-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a chair who is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bbee6029-3c25-46d2-9d45-c5e4153aa5a6" id="sec.102B-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a director; and</txt></block></li><li guid="_33fefd1f-fa19-41e0-8c4f-96459ebe89da" id="sec.102B-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">independent of the beverage industry; and</txt></block></li><li guid="_bd650e23-72be-4ae9-b781-8a3dcdce006d" id="sec.102B-ssec.2-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">approved by the Minister;</txt></block></li></list></block></li><li guid="_687b92a3-f95c-4fe5-ab33-261ff8ece9c7" id="sec.102B-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">at least 1 director who is an executive officer, employee or business associate of a small beverage manufacturer or an association that represents small beverage manufacturers;</txt></block></li><li guid="_6f188012-8a3e-4823-8602-e45d21fc63cf" id="sec.102B-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">at least 1 director who is an executive officer, employee or business associate of a large beverage manufacturer;</txt></block></li><li guid="_200f73ce-825a-4ace-9f98-5ad37b5ffde0" id="sec.102B-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">at least 1 director who—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1fc05fd4-7670-42ff-bfa3-77236ec7b318" id="sec.102B-ssec.2-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">represents the interests of the community; and</txt></block></li><li guid="_53a6feb2-5e82-4e9c-adf9-4c648acd202c" id="sec.102B-ssec.2-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">is independent of the beverage industry; and</txt></block></li><li guid="_dab48520-76b6-4e51-a71f-2e3094728c49" id="sec.102B-ssec.2-para1.d-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">is approved by the Minister;</txt></block></li></list></block></li><li guid="_a8ab3df5-a98e-4714-bc0a-17952dd3f80b" id="sec.102B-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">at least 2 other directors who—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0d6f2e92-9a8a-4fb7-9fb6-5dcbd6b35c9f" id="sec.102B-ssec.2-para1.e-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">have legal or financial qualifications and experience; and</txt></block></li><li guid="_af443ea4-7f37-442c-a74d-7050b24a4a30" id="sec.102B-ssec.2-para1.e-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">are independent of the beverage industry.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9fe69777-b99e-496b-93cf-8e4230373674" id="sec.102B-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_6b5d9b82-e62f-4afc-accf-33229c6b6bfb" id="sec.102B-ssec.3-def.independentofthebeverageindustry_"><txt break.before="1"><defterm guid="_7557e55f-b4b9-42bc-aefd-84c89c73696c" id="sec.102B-ssec.3-def.independentofthebeverageindustry" type="definition">independent of the beverage industry</defterm>, for a person, means the person is not an executive officer, employee or business associate of a manufacturer of a beverage product.</txt></definition><definition affected.by.uncommenced="0" guid="_30099fe7-3fb6-479d-ad1b-66ce28d5a6aa" id="sec.102B-ssec.3-def.largebeveragemanufacturer_"><txt break.before="1"><defterm guid="_2052ad62-8166-4672-9ba0-ee2a55049ee8" id="sec.102B-ssec.3-def.largebeveragemanufacturer" type="definition">large beverage manufacturer</defterm> means a manufacturer of a beverage product other than a small beverage manufacturer.</txt></definition><definition affected.by.uncommenced="0" guid="_66c5c6f7-b942-4178-b4fa-9840d095f1b0" id="sec.102B-ssec.3-def.smallbeveragemanufacturer_"><txt break.before="1"><defterm guid="_27a7c614-3478-402a-8f92-bafd8d8ae202" id="sec.102B-ssec.3-def.smallbeveragemanufacturer" type="definition">small beverage manufacturer</defterm> see <intref check="valid" refid="sec.99R" target.guid="_0425f7a8-8125-4224-94ea-b9c96549f6da">section 99R</intref><intref check="valid" refid="sec.99R-ssec.2" target.guid="_0d2bd664-9da5-4475-9ec9-b9e171917b37">(2)</intref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3b4aa6a4-1f9d-4172-afde-e6e7bcd78666" id="sec.102C" provision.type="other" spent.amends="0"><no>102C </no><heading guid="_e5419cc3-344a-43e8-b154-e669533b60ac" id="sec.102C-he">Powers</heading><block><txt break.before="1">The Organisation has the powers necessary for performing its functions.</txt><note guid="_6026fa0c-c442-4654-bb1f-983949fb088d" id="sec.102C-note" type="example"><heading guid="_ee5eec41-8e3e-46e7-a417-c8f8307e2c23" id="sec.102C-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="sec.99J" target.guid="_55a74d53-7e14-4513-93ed-7220295bff9f">section 99J</intref> for the Organisation’s functions.</txt></block></note></block></clause></division><division affected.by.uncommenced="0" guid="_b93bb7b0-f457-4073-a9b8-82da7ae5d911" id="ch.4-pt.5-div.2"><no>Division 2</no><heading guid="_c23de7f9-8e50-407b-a57d-9f47c1405551" id="ch.4-pt.5-div.2-he">Application for appointment</heading><subdivision affected.by.uncommenced="0" guid="_d3ffff14-4a1a-473b-aa0d-0022c869ab95" id="ch.4-pt.5-div.2-sdiv.1"><no>Subdivision 1</no><heading guid="_3ac197ae-943d-4a38-a082-2d601daebe90" id="ch.4-pt.5-div.2-sdiv.1-he">Application</heading><clause affected.by.uncommenced="0" guid="_b3178608-49b0-4b11-937c-df09e96c58c5" id="sec.102D" provision.type="other" spent.amends="0"><no>102D </no><heading guid="_3947421a-17ad-4bdc-a224-071197e4f869" id="sec.102D-he">Minister may invite application for appointment</heading><subclause affected.by.uncommenced="0" guid="_fc9035f9-2465-40a4-964b-51f3871c6359" id="sec.102D-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may invite an eligible company to apply for appointment as the Product Responsibility Organisation for the container refund scheme.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b8e766ca-2952-4fed-b2f8-feabc1caec3f" id="sec.102D-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The invitation may state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d484db4b-8ecb-485c-94fd-02769718abaf" id="sec.102D-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">outcomes to be met by the Organisation in a stated period after appointment—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c5c6f52a-3b23-4378-a482-25c70c313027" id="sec.102D-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">relating to the Organisation’s functions; and</txt></block></li><li guid="_e3ecfac8-5a71-4a44-930f-90e44bf4f028" id="sec.102D-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">relating to administering the scheme in a way that provides opportunities for social enterprise, innovation and the development of technology; and</txt></block></li></list></block></li><li guid="_85eb5f92-3237-4363-af56-956df7330944" id="sec.102D-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">other requirements for the application.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d95013d5-8a10-4aa8-a3a0-4415963fb9ce" id="sec.102E" provision.type="other" spent.amends="0"><no>102E </no><heading guid="_5ceea307-9060-4464-a580-3f93c5163e4c" id="sec.102E-he">Application</heading><block><txt break.before="1">After receiving the invitation, the eligible company (the <defterm guid="_706fd420-33ad-48d3-926d-8321c5d3f079" id="def.applicant" type="definition">applicant</defterm>) may apply for appointment as the Product Responsibility Organisation.</txt></block></clause><clause affected.by.uncommenced="0" guid="_378b8ba0-b99a-4dcd-a9b9-38135f940b52" id="sec.102F" provision.type="other" spent.amends="0"><no>102F </no><heading guid="_0f404a49-8f4a-45ca-9e67-6e560faacdce" id="sec.102F-he">Requirements for application</heading><subclause affected.by.uncommenced="0" guid="_5f4c5e9b-4d7c-4406-a1aa-91352692e227" id="sec.102F-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The application must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ca3ae36e-0f78-4843-be2f-b52f0e346223" id="sec.102F-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in writing; and</txt></block></li><li guid="_78ca4fdb-627b-4e32-9e8f-7092a243929e" id="sec.102F-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">include details of the applicant’s plans for the following matters—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_82f5652e-780c-4294-9b77-720b8a3e076e" id="sec.102F-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">establishing and administering the scheme generally, including the estimated costs of establishing and administering the scheme;</txt></block></li><li guid="_327244f1-f47c-459c-86ef-6e7727c51d5d" id="sec.102F-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">entering into container recovery agreements with manufacturers of beverage products, including—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0d0e4f41-d5ef-45ac-be6e-71aabfb7e9ff" id="sec.102F-ssec.1-para1.b-para2.ii-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">the proposed amounts to be paid by the manufacturers under the agreements to contribute to costs of the administration of the scheme; and</txt></block></li><li guid="_c99be84b-ae01-452b-bce6-138459bb48a8" id="sec.102F-ssec.1-para1.b-para2.ii-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">a proposed timeframe for entering the agreements;</txt></block></li></list></block></li><li guid="_5a6d3da9-9c25-4ad2-b058-04964a9ab7d2" id="sec.102F-ssec.1-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">establishing a network of container refund points;</txt></block></li><li guid="_a398c5d2-c3c5-45d3-8a0b-a264d9a77b24" id="sec.102F-ssec.1-para1.b-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">entering into container collection agreements with the operators of container refund points, including—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_77f8ff18-3260-423c-a179-209830f55c8e" id="sec.102F-ssec.1-para1.b-para2.iv-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">a process for choosing persons with whom to enter into container collection agreements; and</txt></block></li><li guid="_31ad5ede-c129-460d-bcca-b5c641dd7e76" id="sec.102F-ssec.1-para1.b-para2.iv-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">proposed arrangements for ensuring container refund points are accessible to the public, including proposed locations and operating times; and</txt></block></li><li guid="_221b2ce1-f9cf-4b09-85c6-10125cb85eae" id="sec.102F-ssec.1-para1.b-para2.iv-para3.C" provision.type="other"><no>(C)</no><block><txt break.before="0">the proposed amounts to be paid to operators under the agreements for handling, sorting and transporting containers for recycling; and</txt></block></li><li guid="_defc8d25-cdd9-4901-983c-082858910ba7" id="sec.102F-ssec.1-para1.b-para2.iv-para3.D" provision.type="other"><no>(D)</no><block><txt break.before="0">a proposed timeframe for entering the agreements;</txt></block></li></list></block></li><li guid="_1c26e448-84da-4995-9433-5e258d79dce8" id="sec.102F-ssec.1-para1.b-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">achieving any outcomes stated in the Minister’s invitation;</txt></block></li><li guid="_ba3366e0-f61c-4a5d-8fee-fd66c4492cf3" id="sec.102F-ssec.1-para1.b-para2.vi" provision.type="other"><no>(vi)</no><block><txt break.before="0">setting the amounts payable under the scheme mentioned in <intref check="valid" refid="sec.99J" target.guid="_55a74d53-7e14-4513-93ed-7220295bff9f">section 99J</intref><intref check="valid" refid="sec.99J-ssec.2" target.guid="_06868b1c-55f5-41a5-bdb4-9b3fd7acc07e">(2)</intref><intref check="valid" refid="sec.99J-ssec.2-para1.d" target.guid="_7dc94e42-6973-4315-b57b-c138e2749109">(d)</intref>; and</txt></block></li></list></block></li><li guid="_1ec2bdef-bd33-4cd0-a9ec-2ec7ed4ff5fc" id="sec.102F-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">comply with any other requirements stated in the Minister’s invitation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7be2c0cd-cbd5-407d-bad9-cb2ed9067cf6" id="sec.102F-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application must be accompanied by the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8cb33ed3-d946-412f-8ad0-19aec215bc71" id="sec.102F-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a copy of the applicant’s constitution;</txt></block></li><li guid="_63be318e-8938-47f7-8a5f-958afa3520c9" id="sec.102F-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">evidence establishing the applicant is an eligible company and each of its executive officers is an eligible individual;</txt></block></li><li guid="_0d1c6f44-3eba-48eb-9e95-8df5387367f2" id="sec.102F-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a draft strategic plan and operational plan for establishing and administering the scheme;</txt></block></li><li guid="_dc8ac0a5-2a90-498c-ba26-96a30adba708" id="sec.102F-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">draft terms of a container recovery agreement, container collection agreement and material recovery agreement;</txt></block></li><li guid="_e47d9dd5-5e6c-4db9-9f37-e24155982e2a" id="sec.102F-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">a draft framework for resolving disputes between the applicant, manufacturers of beverage products, the operators of container refund points and the operators of material recovery facilities;</txt></block></li><li guid="_cd1fa6c4-62b4-4afc-ac79-478e5b787384" id="sec.102F-ssec.2-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">draft policies for handling commercial or sensitive information about the beverage market;</txt></block></li><li guid="_4236abb3-f376-4307-bc68-bba3d9234de9" id="sec.102F-ssec.2-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">the signed consent of each person who the applicant considers is an executive officer or business associate of the applicant to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b7c1a3ba-afc1-4bf8-922a-1629459ea477" id="sec.102F-ssec.2-para1.g-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the collection of personal or background information about the person by the chief executive; and</txt></block></li><li guid="_abcad892-903e-4468-a026-3e0b5490d397" id="sec.102F-ssec.2-para1.g-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a criminal history check.</txt></block></li></list></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_80bad818-e656-4ef4-a175-5fd7ded5f279" id="sec.102G" provision.type="other" spent.amends="0"><no>102G </no><heading guid="_207ea7b7-4161-4777-9fa7-2f3c76db5cf7" id="sec.102G-he">Referral of application to chief executive for assessment</heading><block><txt break.before="1">After receiving the application, the Minister must refer the application to the chief executive for assessment.</txt></block></clause><clause affected.by.uncommenced="0" guid="_edb91185-f2ad-4793-a3c1-adab80e34ebd" id="sec.102H" provision.type="other" spent.amends="0"><no>102H </no><heading guid="_ca7e4fd5-cc93-49ce-b4dd-9a28082d3a5e" id="sec.102H-he">Withdrawing or amending application</heading><block><txt break.before="1">The applicant may, at any time—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3f7809c6-927c-453f-9b43-151c56a1defe" id="sec.102H-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">withdraw the application; or</txt></block></li><li guid="_b23ead0f-4fac-4728-a09f-1b79d3e166ef" id="sec.102H-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">amend the application with the agreement of the Minister.</txt></block></li></list></block></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_5a65945f-cb3c-494f-a52b-c68794e0047c" id="ch.4-pt.5-div.2-sdiv.2"><no>Subdivision 2</no><heading guid="_34eba8f8-e7cf-4ca9-bc05-71624a344a4c" id="ch.4-pt.5-div.2-sdiv.2-he">Assessing application</heading><clause affected.by.uncommenced="0" guid="_aea2c873-4cee-4bba-b292-e0f9d545957c" id="sec.102I" provision.type="other" spent.amends="0"><no>102I </no><heading guid="_6effecad-6dac-46d6-987f-fb579f96111e" id="sec.102I-he">Chief executive assesses application</heading><block><txt break.before="1">The chief executive must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1bb32f23-a329-465b-8007-4c810ce10b08" id="sec.102I-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">assess whether the applicant is suitable for appointment as the Product Responsibility Organisation; and</txt></block></li><li guid="_d210cd1a-93d4-4a7f-9567-1a8d565dc226" id="sec.102I-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give the Minister a report about the applicant’s suitability.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_90e5cfad-64d6-460a-8bb9-a747fe4c3347" id="sec.102J" provision.type="other" spent.amends="0"><no>102J </no><heading guid="_afeb3b0f-4c93-4cc9-8ba8-7093beb958ad" id="sec.102J-he">Particular matters for assessing application</heading><subclause affected.by.uncommenced="0" guid="_372e73f1-15b1-40e6-8cc5-d50aaf44c928" id="sec.102J-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">In assessing whether the applicant is suitable for appointment as the Organisation, the chief executive must consider and, if necessary, investigate the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bdf88504-0afd-47da-ae39-f61bcfaa2c5a" id="sec.102J-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the application;</txt></block></li><li guid="_22bddcff-46d0-4c0a-9785-923714affb74" id="sec.102J-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the documents and evidence mentioned in <intref check="valid" refid="sec.102F" target.guid="_378b8ba0-b99a-4dcd-a9b9-38135f940b52">section 102F</intref><intref check="valid" refid="sec.102F-ssec.2" target.guid="_7be2c0cd-cbd5-407d-bad9-cb2ed9067cf6">(2)</intref> that accompanied the application;</txt></block></li><li guid="_fd09ad86-f3ed-4d94-8120-83bfca3d681a" id="sec.102J-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the applicant’s business reputation, current financial position and financial background;</txt></block></li><li guid="_c5c47928-a498-4b65-bc9a-5e808c33ac3b" id="sec.102J-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the suitability of each executive officer and business associate to be associated with the applicant as the Organisation;</txt></block></li><li guid="_fbde3868-0fb0-407f-81ed-4e527bdde4ff" id="sec.102J-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">whether, collectively, the executive officers have the skills, knowledge and experience required for the applicant to perform the functions of the Organisation effectively and efficiently.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_03699226-babd-4f8a-8a0b-766eaa882ccc" id="sec.102J-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In assessing the suitability of an executive officer or business associate of the applicant, the chief executive must consider and, if necessary, investigate the person’s—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5eddca44-3a6e-4efa-b296-a8b091dc699f" id="sec.102J-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">character or business reputation; and</txt></block></li><li guid="_2f0f712e-b4c4-4722-9f56-cfd5e5e9cc73" id="sec.102J-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">relevant skills, knowledge and experience; and</txt></block></li><li guid="_c01a2e71-6c8c-49ba-86e0-a1a2a82f032b" id="sec.102J-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">current financial position and financial background.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_86560db5-479d-4ae8-b750-4fab6148307d" id="sec.102K" provision.type="other" spent.amends="0"><no>102K </no><heading guid="_e84ed2dc-6849-439d-9d41-b502e0e000ea" id="sec.102K-he">Chief executive may require further information or documents</heading><subclause affected.by.uncommenced="0" guid="_516c5f5e-c213-4306-88b6-d724e6827b95" id="sec.102K-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may, by notice, require the applicant to give the chief executive further information or a document reasonably required to decide the application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_46bdb006-3b83-4396-9bf7-48cc9a8833a3" id="sec.102K-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">When making the requirement, the chief executive must warn the applicant the application will not be considered further until the requirement is complied with.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_2ac9e26e-b742-48fd-804f-50788e0f19ad" id="ch.4-pt.5-div.2-sdiv.3"><no>Subdivision 3</no><heading guid="_e7c6b331-f456-4813-8262-307dd2a62d33" id="ch.4-pt.5-div.2-sdiv.3-he">Deciding application</heading><clause affected.by.uncommenced="0" guid="_34c1de5c-fce9-45e0-80ef-94bf32abbcf6" id="sec.102L" provision.type="other" spent.amends="0"><no>102L </no><heading guid="_c675981a-59bc-420e-92a2-32018775d786" id="sec.102L-he">Minister decides application</heading><subclause affected.by.uncommenced="0" guid="_eb822e74-5e74-4f81-836f-c10064415e3f" id="sec.102L-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">After receiving the chief executive’s report about the applicant’s suitability, the Minister must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d0ccb644-4761-4af1-a0cb-30b7b0eb42c0" id="sec.102L-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">consider the application and report; and</txt></block></li><li guid="_2ca29089-e9da-4abb-bc27-8fb6b88cf78e" id="sec.102L-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">decide to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bf618833-b2f1-4aaa-93c4-5cf4983893c2" id="sec.102L-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">appoint the applicant as the Product Responsibility Organisation and impose the conditions on the appointment the Minister considers necessary or desirable; or</txt></block></li><li guid="_dff098dc-eb84-4290-9467-d86ff68a57c0" id="sec.102L-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">refuse the application.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_dcc2aab1-7f7d-4ec7-87c5-561957e21d9f" id="sec.102L-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister must not decide to appoint the applicant unless the Minister is satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_76ee9a32-163c-4393-9ee2-f025c17da55d" id="sec.102L-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the applicant has satisfactory plans about the matters mentioned in <intref check="valid" refid="sec.102F" target.guid="_378b8ba0-b99a-4dcd-a9b9-38135f940b52">section 102F</intref><intref check="valid" refid="sec.102F-ssec.1" target.guid="_5f4c5e9b-4d7c-4406-a1aa-91352692e227">(1)</intref><intref check="valid" refid="sec.102F-ssec.1-para1.b" target.guid="_78ca4fdb-627b-4e32-9e8f-7092a243929e">(b)</intref>; and</txt></block></li><li guid="_03308853-002c-4e9f-92e4-b1c43bbad21a" id="sec.102L-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">collectively, the executive officers have the skills, knowledge and experience required for the applicant to perform the functions of the Organisation effectively and efficiently.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_96b7e45e-7fd6-4a58-b366-1232bfb23bec" id="sec.102M" provision.type="other" spent.amends="0"><no>102M </no><heading guid="_36420a28-306b-4537-bcb4-5bd27391b8df" id="sec.102M-he">Decision to make appointment</heading><subclause affected.by.uncommenced="0" guid="_eb9dcc0f-8399-401c-ab38-2f3c2e7f8fed" id="sec.102M-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the Minister decides to appoint the applicant as the Product Responsibility Organisation, the Minister must, as soon as practicable after making the decision, give the applicant a notice about the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4f3cfdd0-e095-4046-ac51-74bb5af02434" id="sec.102M-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_421e2852-4a92-451e-92f0-f4923de96e6d" id="sec.102M-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">state the applicant is appointed as the Product Responsibility Organisation; and</txt></block></li><li guid="_44e2e72c-868c-416d-9b0d-da5ea8542d71" id="sec.102M-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state when the appointment takes effect; and</txt></block></li><li guid="_cda25ff8-c731-425b-b865-5c11fda1d443" id="sec.102M-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">state any conditions imposed on the appointment; and</txt></block></li><li guid="_fd8115c4-424a-4b22-9279-bab4e43cf1a1" id="sec.102M-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">if the appointment is subject to conditions—be an information notice for the decision.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_75a056e8-bbc1-4f79-a396-698d4ffc3657" id="sec.102N" provision.type="other" spent.amends="0"><no>102N </no><heading guid="_345db179-8cbc-4534-820b-3aa580ddfc5d" id="sec.102N-he">Refusal of application</heading><block><txt break.before="1">If the Minister decides to refuse the application, the Minister must give the applicant an information notice for the decision within 10 business days after making the decision.</txt></block></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_eeead78e-c66f-456b-b531-a884bc3913dd" id="ch.4-pt.5-div.2-sdiv.4"><no>Subdivision 4</no><heading guid="_8badd881-3eed-4524-8cf2-19862e566eb9" id="ch.4-pt.5-div.2-sdiv.4-he">General</heading><clause affected.by.uncommenced="0" guid="_3c991a26-4a6d-45cb-b346-9664eb31334a" id="sec.102O" provision.type="other" spent.amends="0"><no>102O </no><heading guid="_938a9d87-8f69-448f-ad82-ce9b598cfcb0" id="sec.102O-he">Appointment continues in force</heading><subclause affected.by.uncommenced="0" guid="_a7c534fa-84e6-415d-a58b-95242ee7d72d" id="sec.102O-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The appointment of a company as the Organisation continues in force until the appointment is cancelled.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_46db276a-7364-4157-a1a8-699c5dd954ef" id="sec.102O-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if the appointment is suspended, the appointment does not have effect during the period of the suspension.</txt></block></subclause></clause></subdivision></division><division affected.by.uncommenced="0" guid="_9e9cec92-06dd-4a83-80a4-0931ac3cdc13" id="ch.4-pt.5-div.3"><no>Division 3</no><heading guid="_73a20551-6e88-4a48-917f-95fef8deb099" id="ch.4-pt.5-div.3-he">Application to amend appointment</heading><clause affected.by.uncommenced="0" guid="_9f0f6693-8344-465d-8c89-3a2404a7c65d" id="sec.102P" provision.type="other" spent.amends="0"><no>102P </no><heading guid="_69bf77b2-eda3-414a-9cee-79cc23cd6181" id="sec.102P-he">Applying to amend appointment</heading><subclause affected.by.uncommenced="0" guid="_7596a2a4-dd08-419b-b18b-c6026974d93a" id="sec.102P-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The company appointed as the Organisation may apply to the Minister to amend the appointment, including a condition of the appointment (an <defterm guid="_e0d62f88-c5bc-4e52-8cc9-3eb08e1136ba" id="sec.102P-def.amendmentapplication" type="definition">amendment application</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_07f6ebad-0edc-4613-8244-9eaa4f62138a" id="sec.102P-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister must refer an amendment application to the chief executive for assessment.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_304dfea8-03e9-417c-a72f-507c19254d5a" id="sec.102Q" provision.type="other" spent.amends="0"><no>102Q </no><heading guid="_b76e1509-f8d4-46d5-b4d2-dcb0a5ce3a94" id="sec.102Q-he">Assessing application</heading><subclause affected.by.uncommenced="0" guid="_1864266f-31c2-4415-ae26-808bd359ceaa" id="sec.102Q-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cdb96921-ad20-4a34-b2a0-aa7eb5ae4fe5" id="sec.102Q-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">assess the amendment application; and</txt></block></li><li guid="_5eed9bba-ee34-483a-b3ce-814603ccdd47" id="sec.102Q-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give the Minister a report about the amendment application.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3923d9b0-e9c9-44b7-9e37-185c1985a9df" id="sec.102Q-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.102J" target.guid="_90e5cfad-64d6-460a-8bb9-a747fe4c3347">Sections 102J</intref> and <intref check="valid" refid="sec.102K" target.guid="_86560db5-479d-4ae8-b750-4fab6148307d">102K</intref> apply—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0b3ef573-bf47-4c58-9bf3-0ec2bee653da" id="sec.102Q-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for the purpose of the chief executive assessing the amendment application; and</txt></block></li><li guid="_402a4aa2-fb18-4cc5-b3fe-fe338e8526b6" id="sec.102Q-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">as though a reference in those sections to the application is a reference to the amendment application.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_943f1698-49a9-4a13-9762-77637ebf3d9a" id="sec.102R" provision.type="other" spent.amends="0"><no>102R </no><heading guid="_704e3afc-2fe3-4d6b-a8f3-134548a37f82" id="sec.102R-he">Deciding amendment application</heading><subclause affected.by.uncommenced="0" guid="_78317e27-576b-4ee4-81c6-71aff3771e01" id="sec.102R-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies after the Minister is given a report about the chief executive’s assessment of an amendment application under <intref check="valid" refid="sec.102Q" target.guid="_304dfea8-03e9-417c-a72f-507c19254d5a">section 102Q</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7fa6b55e-9567-4ab0-8016-bde0ff261704" id="sec.102R-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_93a76e00-d366-42a0-b88d-921bd0be4171" id="sec.102R-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">consider the amendment application and report about the chief executive’s assessment of the amendment application; and</txt></block></li><li guid="_888ba857-86bb-47be-b713-def841f25001" id="sec.102R-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">decide to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2c7f47e4-a6d0-41f0-ad85-d600394faa31" id="sec.102R-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">grant the application; or</txt></block></li><li guid="_6942aed5-8741-48ef-a9d5-5b3981e6241b" id="sec.102R-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the Minister decides to grant the application—impose or amend the conditions on the appointment the Minister considers are necessary or desirable; or</txt></block></li><li guid="_ca920453-003e-4005-a247-d61fbe85ec6b" id="sec.102R-ssec.2-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">refuse the application.</txt></block></li></list></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f9b89306-d334-4ca5-a8ce-029313ccc476" id="sec.102S" provision.type="other" spent.amends="0"><no>102S </no><heading guid="_45ac24f0-1e23-4499-9602-bda020f75d21" id="sec.102S-he">Decision to amend appointment</heading><subclause affected.by.uncommenced="0" guid="_645c015e-9e71-4ad2-9b66-98083c587b35" id="sec.102S-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the Minister decides to grant the company’s amendment application, the Minister must give the company a notice about the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fd0eecb4-4898-4a67-ba13-ed2ff5736ae4" id="sec.102S-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must be given as soon as practicable after the decision is made and state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_28e9db6d-11b4-44dc-b5cf-e71b2d09ae98" id="sec.102S-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">how the appointment is amended; and</txt></block></li><li guid="_40412801-bc87-4d89-bf4e-b31ca2bdc382" id="sec.102S-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any new conditions imposed on the appointment; and</txt></block></li><li guid="_29b745a2-f681-4615-b8ec-c90be2172cd0" id="sec.102S-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">any existing conditions amended for the appointment; and</txt></block></li><li guid="_dacb6ba9-af52-4f58-9cfa-609cbd8344ed" id="sec.102S-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">when the amendment takes effect.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a83cba95-4b83-4753-bc44-2ae56b352236" id="sec.102S-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the Minister imposes or amends any conditions on the appointment, the notice must also be an information notice for the decision to amend or impose the conditions.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e78b3887-e806-4b4d-811a-234c9264315d" id="sec.102T" provision.type="other" spent.amends="0"><no>102T </no><heading guid="_73ac55dd-20e2-4a1c-93e9-45d756a2e751" id="sec.102T-he">Refusal of application</heading><block><txt break.before="1">If the Minister decides to refuse the amendment application, the Minister must give the company an information notice for the decision within 10 business day of making the decision.</txt></block></clause></division><division affected.by.uncommenced="0" guid="_336fdfa9-101d-446e-8286-d78271a183d0" id="ch.4-pt.5-div.4"><no>Division 4</no><heading guid="_b53fe5c4-797a-4213-b43d-335a70df8d64" id="ch.4-pt.5-div.4-he">Amendment, suspension, cancellation and appointment of administrator</heading><subdivision affected.by.uncommenced="0" guid="_0530ca3a-1aef-452f-8b23-92760a693410" id="ch.4-pt.5-div.4-sdiv.1"><no>Subdivision 1</no><heading guid="_b7597e0c-7ea5-4893-bf3b-734cfd3fcd90" id="ch.4-pt.5-div.4-sdiv.1-he">General</heading><clause affected.by.uncommenced="0" guid="_e37873c8-9572-4b2c-861f-af52f59969ac" id="sec.102U" provision.type="other" spent.amends="0"><no>102U </no><heading guid="_25b49841-6581-4027-9640-2768729d1f58" id="sec.102U-he">Minister may amend appointment</heading><block><txt break.before="1">The Minister may, on the Minister’s own initiative or on the recommendation of the chief executive, amend a company’s appointment as the Organisation.</txt></block></clause><clause affected.by.uncommenced="0" guid="_9018d73b-ed90-4eb0-a24c-47f4d1c51cbd" id="sec.102V" provision.type="other" spent.amends="0"><no>102V </no><heading guid="_414ee5c5-4264-43e5-8342-f41777dc3f39" id="sec.102V-he">Grounds for suspending or cancelling appointment as Organisation</heading><block><txt break.before="1">Each of the following is a ground to suspend or cancel a company’s appointment as the Organisation—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_be339eba-db00-4b28-8bad-ea8a00066426" id="sec.102V-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the company is no longer an eligible company;</txt></block></li><li guid="_71ac7a74-dbea-4120-99cd-a8a34f3e704b" id="sec.102V-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an executive officer of the company is no longer an eligible individual;</txt></block></li><li guid="_4f46adde-a535-4d96-8b8b-8e320e0cf71e" id="sec.102V-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the company is no longer suitable for appointment as the Organisation;</txt></block></li><li guid="_4098a7d2-28bc-44a1-8603-ac9883c9cade" id="sec.102V-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the company as the Organisation has contravened a provision of this Act;</txt></block></li><li guid="_48939c75-04a2-4a0e-895d-97004a4cea16" id="sec.102V-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the company has contravened a condition of its appointment as the Organisation;</txt></block></li><li guid="_7be1b061-7a25-4060-8232-3015db79e192" id="sec.102V-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">the company as the Organisation has failed to comply with a direction of the Minister under <intref check="valid" refid="sec.102ZE" target.guid="_3657d8f3-6d17-4ed4-a2fa-997c9cf7c513">section 102ZE</intref>;</txt></block></li><li guid="_f15f7dd3-ac0d-4dde-b85a-16691989082d" id="sec.102V-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">the company as the Organisation has failed to achieve, and is unlikely to achieve, an outcome prescribed under <intref check="valid" refid="sec.102ZF" target.guid="_825a1419-1e97-4856-98b1-3bd91e44ba36">section 102ZF</intref> during a particular period;</txt></block></li><li guid="_4c453c7d-53d5-4a53-8f79-ec822a34ff52" id="sec.102V-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">the company as the Organisation has contravened a compliance notice given to the company under <intref check="valid" refid="ch.11" target.guid="_e6645484-8c0c-4512-9bf9-7a0ca2fe74f1">chapter 11</intref>;</txt></block></li><li guid="_cb0c9ca5-ddcc-4a7b-b934-745983d76dea" id="sec.102V-para1.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the company was appointed as the Organisation because of a materially false or misleading representation or declaration.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_78f5b3c4-9d4a-423f-ba1b-c809ccdda908" id="sec.102W" provision.type="other" spent.amends="0"><no>102W </no><heading guid="_58c244cf-f1cb-4a98-9413-586fa2903761" id="sec.102W-he">Immediate suspension</heading><subclause affected.by.uncommenced="0" guid="_6aa302b2-d5ab-49ef-afea-8c97711e9395" id="sec.102W-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may suspend the appointment of a company as the Organisation immediately if the Minister reasonably believes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_825dda4f-fe5e-4e2e-92b3-143e57785a10" id="sec.102W-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a ground exists to suspend or cancel the company’s appointment; and</txt></block></li><li guid="_6284ab67-4787-4b47-8783-61b311ca7076" id="sec.102W-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the circumstances warrant the immediate suspension of the appointment to ensure—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9aadd321-3b12-4518-bc47-96d61e5c8638" id="sec.102W-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the safety of persons; or</txt></block></li><li guid="_5a908d20-91ad-4edc-9172-8e2dd1ea53bd" id="sec.102W-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the public interest in the scheme is not adversely affected.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_4304be72-bfff-47fd-b80b-a256d97ad85f" id="sec.102W-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the Minister decides to suspend the company’s appointment under <intref check="valid" refid="sec.102W-ssec.1" target.guid="_6aa302b2-d5ab-49ef-afea-8c97711e9395">subsection (1)</intref>, the Minister must give the company—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_51691f40-9c06-42dd-8644-75f0722f87f1" id="sec.102W-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an information notice for the decision to suspend the appointment immediately; and</txt></block></li><li guid="_3832a3af-d94d-4ee7-b591-3b2200847317" id="sec.102W-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a show cause notice under <intref check="valid" refid="sec.102X" target.guid="_4195f74e-aebf-4f04-868e-96f7b4a6eccc">section 102X</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a11ccd02-cf13-458b-9190-b67ea0adf172" id="sec.102W-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The suspension—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1a97a953-9b8f-4555-b192-de6e62bc55fb" id="sec.102W-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">takes effect when the notices are given to the company; and</txt></block></li><li guid="_27f3bfba-6f5f-49ee-a347-a4dd4901bf94" id="sec.102W-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">continues until the earliest of the following happens—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6e5a11e0-46d4-40a9-a4d8-c562ab9ef2b2" id="sec.102W-ssec.3-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the Minister ends the suspension;</txt></block></li><li guid="_663843be-5263-42cf-bdcb-c0b8e68ce3ea" id="sec.102W-ssec.3-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the show cause notice is finally dealt with;</txt></block></li><li guid="_49e39005-fb01-4403-baca-c304acca4c4d" id="sec.102W-ssec.3-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">30 business days after the notices are given to the company.</txt></block></li></list></block></li></list></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_06989399-6459-42be-b84e-971293cc38b6" id="ch.4-pt.5-div.4-sdiv.2"><no>Subdivision 2</no><heading guid="_fafb5a30-8b8c-44c3-8a5b-0d1b2736c938" id="ch.4-pt.5-div.4-sdiv.2-he">Process for taking proposed action</heading><clause affected.by.uncommenced="0" guid="_4195f74e-aebf-4f04-868e-96f7b4a6eccc" id="sec.102X" provision.type="other" spent.amends="0"><no>102X </no><heading guid="_4d43c248-1007-46aa-a883-bc63f5a52354" id="sec.102X-he">Show cause notice</heading><subclause affected.by.uncommenced="0" guid="_dffbe720-b06e-47cf-a722-67141b18dea7" id="sec.102X-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the Minister proposes to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6c680cc8-590c-4048-aeef-b40cbcb1b7c2" id="sec.102X-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">amend the company’s appointment as the Organisation (the <defterm guid="_1defc048-6cd6-421a-86b6-9d9e102060b7" id="sec.102X-ssec.1-def.proposedaction" type="definition">proposed action</defterm>); or</txt></block></li><li guid="_b7ba28dd-8912-403a-afa3-28ebf07a9820" id="sec.102X-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">suspend or cancel the company’s appointment as the Organisation (also the <defterm guid="_d2e523f5-bc8f-4422-8e91-5f146401c824" id="sec.102X-ssec.1-def.proposedaction-oc.2" type="definition">proposed action</defterm>).</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1ad8253e-b8a1-47fe-bb32-f126b0227415" id="sec.102X-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the proposed action is suspension, the proposed action must also include appointing an administrator.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bd1b5c3f-3684-4260-8ebb-55657220764f" id="sec.102X-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister must give a notice (a <defterm guid="_74fe6c7d-b9b0-45db-b3db-acc720c3a610" id="sec.102X-def.showcausenotice" type="definition">show cause notice</defterm>) about the proposed action to the company.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_47b06467-feba-4ba5-8563-132ab3181651" id="sec.102X-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The show cause notice must state the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dcbdc681-31f5-4803-9ffb-17f15cc6ce16" id="sec.102X-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the proposed action;</txt></block></li><li guid="_f0c30e0b-dad8-4668-92d3-700aedd2a926" id="sec.102X-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the proposed action is an amendment—the proposed amendment;</txt></block></li><li guid="_ebf98f2c-23a1-4a7c-99dc-6cc781ceca7c" id="sec.102X-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the proposed action is suspension—the period of the suspension;</txt></block></li><li guid="_f736c17e-97d3-409a-863b-3972f5fd06f4" id="sec.102X-ssec.4-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the grounds for the proposed action;</txt></block></li><li guid="_52acdedb-6869-4012-b491-c1e8fc9d8733" id="sec.102X-ssec.4-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the facts and circumstances that form the basis for the grounds;</txt></block></li><li guid="_3ac1d9f9-ba1f-4c9a-ac92-7b58b3f9287b" id="sec.102X-ssec.4-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">that the company may, within a stated period (the <defterm guid="_40caf9e9-c7b6-4bc0-9686-9039192af73a" id="sec.102X-ssec.4-def.showcauseperiod" type="definition">show cause period</defterm>), make a written submission to the Minister about why the proposed action should not be taken.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_24788041-b700-40b4-8c13-91d533ec9569" id="sec.102X-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The show cause period must end at least 28 days after the company is given the show cause notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d6c50250-906e-47f1-8da4-6529700027ed" id="sec.102X-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The Minister may ask the chief executive to prepare a report about the submissions made by the company during the show cause period.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b0162558-88df-4d1e-9682-b1cd1e6f7e26" id="sec.102Y" provision.type="other" spent.amends="0"><no>102Y </no><heading guid="_7d121ca8-9269-4159-bba1-ccf42a63358b" id="sec.102Y-he">Decision about proposed amendment, suspension or cancellation</heading><subclause affected.by.uncommenced="0" guid="_a8f8ac48-a358-4721-b80a-d8059ce36da2" id="sec.102Y-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Within 20 business days after the end of the period for making submissions stated in the show cause notice, the Minister must decide whether or not to take the proposed action.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_cf610cad-2c37-4132-b268-f9751db61fb1" id="sec.102Y-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister may decide—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8ba8fe4e-fded-464d-b632-e4f1860d19b2" id="sec.102Y-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the proposed action was to make a stated amendment—to make the stated amendment; or</txt></block></li><li guid="_f0ea4a91-7e9a-40e9-88f7-2894198ba76a" id="sec.102Y-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the proposed action was to suspend the appointment for a stated period—to suspend the appointment for no longer than the stated period; or</txt></block></li><li guid="_ecf254c2-f68c-420b-98b7-5528a2cd2015" id="sec.102Y-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the proposed action was to cancel the appointment—to suspend the appointment for a period or cancel the appointment.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a985a201-9a06-436c-b212-be50a548d470" id="sec.102Y-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the Minister may extend, on 1 occasion and by no more than 20 business days, the period for making a decision by giving a notice about the extension to the company before the end of the period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fa393c7b-e3d9-4e32-9431-100dc18c5cac" id="sec.102Y-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In deciding whether or not to take the proposed action, the Minister must consider the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_69e1164e-2c5e-4bae-bf36-839ebf726607" id="sec.102Y-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">all submissions made by the company during the show cause period;</txt></block></li><li guid="_2c3a1bd7-d39a-4ef0-b9b6-aa7c1aebb259" id="sec.102Y-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the Minister asked the chief executive to prepare a report about the submissions—the chief executive’s report;</txt></block></li><li guid="_a389e7a3-69e3-4ca9-8598-0fb167ddad09" id="sec.102Y-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the objects of this Act and how they are to be achieved, as stated in <intref check="valid" refid="ch.1" target.guid="_a76c0db3-d9c9-4095-9a30-beaab8465e54">chapter 1</intref>, <intref check="valid" refid="ch.1-pt.2" target.guid="_fe94d6f8-d7d7-45ee-b632-e5862debf4ee">part 2</intref>;</txt></block></li><li guid="_3f345935-60db-4af3-9872-dc199f7ce18c" id="sec.102Y-ssec.4-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">another matter prescribed by regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0697ba9d-09fa-467a-9e45-3c8b33d99b14" id="sec.102Y-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the Minister decides to take the proposed action, the Minister must, within 10 business days after making the decision, give the company an information notice for the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_54531c81-6dea-441f-ac24-6a5933e8c5b1" id="sec.102Y-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The decision to take the proposed action takes effect on the later of the following days—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_58249f0e-f344-4d81-89d5-0a407c5cf7c1" id="sec.102Y-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the day the information notice is given to the company;</txt></block></li><li guid="_a4c9de5b-fddc-40b8-be07-375320e390c5" id="sec.102Y-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a day stated in the information notice.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_85dc4514-8852-4c2d-8f8c-463727dc37c7" id="sec.102Y-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">If the Minister decides not to take the proposed action, the Minister must give the company a notice about the decision within 5 business days after making the decision.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_1626e2e7-28c8-401e-a753-0cdade40ea3d" id="ch.4-pt.5-div.4-sdiv.3"><no>Subdivision 3</no><heading guid="_9a1fcdf9-8047-452f-b4bd-98e306f4f115" id="ch.4-pt.5-div.4-sdiv.3-he">Appointment of administrator</heading><clause affected.by.uncommenced="0" guid="_64c60b18-36b1-47da-91c0-3e43300d48d3" id="sec.102Z" provision.type="other" spent.amends="0"><no>102Z </no><heading guid="_5f4bd272-d416-4c71-8c20-e197ee710acf" id="sec.102Z-he">Appointment of administrator</heading><subclause affected.by.uncommenced="0" guid="_2c4a602f-69a7-4b61-a5f4-df4b732db2d4" id="sec.102Z-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may appoint an administrator—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fb111adf-e58f-4af3-88ca-f115590826ed" id="sec.102Z-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the Minister suspends a company’s appointment as the Organisation under <intref check="valid" refid="sec.102Y" target.guid="_b0162558-88df-4d1e-9682-b1cd1e6f7e26">section 102Y</intref>—for the company as the Organisation; or</txt></block></li><li guid="_adcbe508-376a-468b-b4c2-4da71cfd4369" id="sec.102Z-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the Minister cancels a company’s appointment as the Organisation under <intref check="valid" refid="sec.102Y" target.guid="_b0162558-88df-4d1e-9682-b1cd1e6f7e26">section 102Y</intref>—to perform the functions of the Organisation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_625191c3-1a12-4f4c-abbf-1fbb399586bc" id="sec.102Z-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An administrator, during the administrator’s term of appointment and to the exclusion of any other person—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8516c9f1-070c-4645-949d-272542d7f5a8" id="sec.102Z-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">has the function—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_00cbc051-0475-4e23-bbe9-c6d331c96fdb" id="sec.102Z-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">for an administrator appointed under <intref check="valid" refid="sec.102Z-ssec.1" target.guid="_2c4a602f-69a7-4b61-a5f4-df4b732db2d4">subsection (1)</intref><intref check="valid" refid="sec.102Z-ssec.1-para1.a" target.guid="_fb111adf-e58f-4af3-88ca-f115590826ed">(a)</intref>—of conducting and managing the affairs of the company as the Organisation; or</txt></block></li><li guid="_8afd0faa-8aa8-43d3-93b0-41da5a8623e2" id="sec.102Z-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">for an administrator appointed under <intref check="valid" refid="sec.102Z-ssec.1" target.guid="_2c4a602f-69a7-4b61-a5f4-df4b732db2d4">subsection (1)</intref><intref check="valid" refid="sec.102Z-ssec.1-para1.b" target.guid="_adcbe508-376a-468b-b4c2-4da71cfd4369">(b)</intref>—of being the Organisation under this Act; and</txt></block></li></list></block></li><li guid="_0b0736a0-ac85-46e2-83f3-35d0801ce847" id="sec.102Z-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">has the other functions stated in the administrator’s notice of appointment; and</txt></block></li><li guid="_cfbf4bb3-a9b9-4f3f-85be-6227bb389159" id="sec.102Z-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">is taken to be the Organisation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_199d6204-77bb-4191-beef-d6aba5a5ae3a" id="sec.102Z-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The function of the administrator under <intref check="valid" refid="sec.102Z-ssec.2" target.guid="_625191c3-1a12-4f4c-abbf-1fbb399586bc">subsection (2)</intref><intref check="valid" refid="sec.102Z-ssec.2-para1.a" target.guid="_8516c9f1-070c-4645-949d-272542d7f5a8">(a)</intref> may be limited by the administrator’s notice of appointment.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8e8b3b48-cc2a-4d87-bf85-666cb32ff55a" id="sec.102ZA" provision.type="other" spent.amends="0"><no>102ZA </no><heading guid="_38d81387-1e9f-4c52-9149-500256e11396" id="sec.102ZA-he">Powers</heading><block><txt break.before="1">An administrator may do anything necessary or convenient to be done for, or in connection with, the administrator’s functions.</txt></block></clause><clause affected.by.uncommenced="0" guid="_f91e8c66-cbef-48f1-8241-b579188fd25f" id="sec.102ZB" provision.type="other" spent.amends="0"><no>102ZB </no><heading guid="_ae198acc-a349-4853-9a81-6b6aee49dca7" id="sec.102ZB-he">Providing assistance</heading><subclause affected.by.uncommenced="0" guid="_7fdc47f3-73b4-417b-bafd-ed27ca32fbe2" id="sec.102ZB-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An administrator appointed under <intref check="valid" refid="sec.102Z" target.guid="_64c60b18-36b1-47da-91c0-3e43300d48d3">section 102Z</intref> may, for performing the administrator’s functions, by a notice given to an officer or employee or former officer or employee of the company, require the person to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0c653199-7cfa-41e0-84a1-44b9392f9dfe" id="sec.102ZB-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">produce documents in the person’s possession that the administrator reasonably requires to perform the functions; or</txt></block></li><li guid="_c43a7082-5794-4005-b18a-d6b491eea737" id="sec.102ZB-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">provide the other information or assistance the administrator reasonably requires to perform the functions.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_fdbf6d3c-7750-463c-955e-a3d1f7763bbb" id="sec.102ZB-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A person of whom a requirement has been made under <intref check="valid" refid="sec.102ZB-ssec.1" target.guid="_7fdc47f3-73b4-417b-bafd-ed27ca32fbe2">subsection (1)</intref> must comply with it unless the person has a reasonable excuse.</txt><penalty guid="_28e40b34-f3f7-4d1b-8f9a-2a81f8ee4f52" id="sec.102ZB-ssec.2-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></block></subclause><subclause affected.by.uncommenced="0" guid="_4e9c30fa-4509-4b18-aef1-9fb163559785" id="sec.102ZB-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">It is a reasonable excuse for an individual not to comply with the requirement if doing so might tend to incriminate the individual.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0329edee-6661-49e2-b0ba-726001425bb3" id="sec.102ZB-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_d38284d9-54da-4f1b-8bfc-5df0ba381ef4" id="sec.102ZB-ssec.4-def.thecompany_"><txt break.before="1"><defterm guid="_d13ed0ea-c8a6-4862-aaf1-2ac00c9566ff" id="sec.102ZB-ssec.4-def.thecompany" type="definition">the company</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_19990210-8a7d-466d-8801-02d84a0f9e37" id="sec.102ZB-ssec.4-def.thecompany-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the administrator is appointed under <intref check="valid" refid="sec.102Z" target.guid="_64c60b18-36b1-47da-91c0-3e43300d48d3">section 102Z</intref><intref check="valid" refid="sec.102Z-ssec.1" target.guid="_2c4a602f-69a7-4b61-a5f4-df4b732db2d4">(1)</intref><intref check="valid" refid="sec.102Z-ssec.1-para1.a" target.guid="_fb111adf-e58f-4af3-88ca-f115590826ed">(a)</intref>—the company whose appointment as the Organisation is suspended; or</txt></block></li><li guid="_1356ca3b-8203-4740-b5e3-c8e8329e149c" id="sec.102ZB-ssec.4-def.thecompany-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the administrator is appointed under <intref check="valid" refid="sec.102Z" target.guid="_64c60b18-36b1-47da-91c0-3e43300d48d3">section 102Z</intref><intref check="valid" refid="sec.102Z-ssec.1" target.guid="_2c4a602f-69a7-4b61-a5f4-df4b732db2d4">(1)</intref><intref check="valid" refid="sec.102Z-ssec.1-para1.b" target.guid="_adcbe508-376a-468b-b4c2-4da71cfd4369">(b)</intref>—the company that was appointed as the Organisation most recently before the administrator was appointed.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_474bef61-082c-4102-804b-8f6bdbc76863" id="sec.102ZC" provision.type="other" spent.amends="0"><no>102ZC </no><heading guid="_f1630f3d-47ce-44ea-b627-544a4cf529ff" id="sec.102ZC-he">Remuneration and costs</heading><subclause affected.by.uncommenced="0" guid="_5b941ade-a8f1-41e6-9f2d-dc74d9398d62" id="sec.102ZC-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a person appointed as administrator is not a public service employee, the person is entitled to be paid the remuneration decided by the chief executive.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ba5f0253-0d79-4540-80d4-b3e1072d4dc2" id="sec.102ZC-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The costs of and incidental to the performance of the functions of the administrator are payable by the company.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8550fc3d-860d-4abe-9c93-666ff68045ac" id="sec.102ZC-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_7c4c9532-f2f7-4bb2-a654-990bf69f1597" id="sec.102ZC-ssec.3-def.thecompany_"><txt break.before="1"><defterm guid="_3ac2f540-5021-4ce0-a8f4-0e0d1c85df20" id="sec.102ZC-ssec.3-def.thecompany" type="definition">the company</defterm> see <intref check="valid" refid="sec.102ZB" target.guid="_f91e8c66-cbef-48f1-8241-b579188fd25f">section 102ZB</intref><intref check="valid" refid="sec.102ZB-ssec.4" target.guid="_0329edee-6661-49e2-b0ba-726001425bb3">(4)</intref>.</txt></definition></deflist></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_483e3552-7731-4907-bbe5-48a1f007c329" id="ch.4-pt.5-div.4-sdiv.4"><no>Subdivision 4</no><heading guid="_528acf45-a066-4ab9-9e7e-faf4c51b4388" id="ch.4-pt.5-div.4-sdiv.4-he">Minor amendment</heading><clause affected.by.uncommenced="0" guid="_04faa05b-3e15-4372-abd7-cfb404642ad8" id="sec.102ZD" provision.type="other" spent.amends="0"><no>102ZD </no><heading guid="_08f1c814-2f82-4ebe-8383-69bb1385b80c" id="sec.102ZD-he">Minor amendment</heading><subclause affected.by.uncommenced="0" guid="_269b613e-4c7b-4f24-8305-931d75b4df0c" id="sec.102ZD-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may make a minor amendment of a company’s appointment as the Organisation by giving a notice about the amendment to the company.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e441890e-4101-4768-b4b2-4ab467f7049d" id="sec.102ZD-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">This section applies despite <intref check="valid" refid="ch.4-pt.5-div.4-sdiv.2" target.guid="_06989399-6459-42be-b84e-971293cc38b6">subdivision 2</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_041b97b9-70bf-45f8-af46-5a6909392124" id="sec.102ZD-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_1f8b54c8-2660-4cb6-a3b3-0afc1bb66dce" id="sec.102ZD-ssec.3-def.minoramendment_"><txt break.before="1"><defterm guid="_a6524098-d20d-4507-b8d2-0382628f29e8" id="sec.102ZD-ssec.3-def.minoramendment" type="definition">minor amendment</defterm>, of a company’s appointment as the Organisation, means an amendment of the appointment—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_38d6de2d-c405-458a-b5bb-485f9abe5f70" id="sec.102ZD-ssec.3-def.minoramendment-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to correct a minor or formal error in the appointment; or</txt></block></li><li guid="_8df377a7-23e1-4de3-bb85-bdbf3cbb779e" id="sec.102ZD-ssec.3-def.minoramendment-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to make another change that is not a change of substance and does not adversely affect the company.</txt></block></li></list></definition></deflist></block></subclause></clause></subdivision></division><division affected.by.uncommenced="0" guid="_0482837e-ad60-4644-820f-75cd0bb0924c" id="ch.4-pt.5-div.5"><no>Division 5</no><heading guid="_b1e4fae6-2067-4e97-ae7f-0ee70fa90a36" id="ch.4-pt.5-div.5-he">Accountability, planning and reporting</heading><subdivision affected.by.uncommenced="0" guid="_66a5fe30-0a9c-40c9-9a59-8d42cbbdf01f" id="ch.4-pt.5-div.5-sdiv.1"><no>Subdivision 1</no><heading guid="_626ddbe6-cf97-4100-b258-93b804949b45" id="ch.4-pt.5-div.5-sdiv.1-he">Ministerial directions</heading><clause affected.by.uncommenced="0" guid="_3657d8f3-6d17-4ed4-a2fa-997c9cf7c513" id="sec.102ZE" provision.type="other" spent.amends="0"><no>102ZE </no><heading guid="_7202ec6e-8d60-4ef1-b532-74984e009e37" id="sec.102ZE-he">Ministerial directions</heading><subclause affected.by.uncommenced="0" guid="_95450caa-67e4-4489-a2b0-dbfa6cbaaaf0" id="sec.102ZE-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may give the Organisation a written direction about the performance of its functions or the exercise of its powers.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1abeff48-a619-4ddb-9fb0-c83831565a82" id="sec.102ZE-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Organisation must comply with the direction.</txt><note guid="_8cf1deae-6626-477d-9847-043908663720" id="sec.102ZE-ssec.2-note" type="example"><heading guid="_8e75bd6b-5d31-4f84-8004-877e2a0ee0ae" id="sec.102ZE-ssec.2-note-he">Note—</heading><block><txt break.before="1">Failure to comply with the direction is not an offence but may be a ground for suspending or cancelling a company’s appointment as the Organisation. See <intref check="valid" refid="sec.102V" target.guid="_9018d73b-ed90-4eb0-a24c-47f4d1c51cbd">section 102V</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_cdfe7ab9-0056-4f5f-b1a2-3444cc1c11a5" id="sec.102ZE-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Organisation must include in its annual report for a financial year prepared under <intref check="valid" refid="sec.102ZJ" target.guid="_17829a70-b4d2-47e7-a436-6c344fb26ab7">section 102ZJ</intref> details of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d1e57517-e2f1-43c7-a1aa-9b093a8e388a" id="sec.102ZE-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">each direction given by the Minister under this section in the year; and</txt></block></li><li guid="_02d68a32-dfd4-45d2-82f4-6aa36d943e81" id="sec.102ZE-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">action taken by the Organisation in the year because of the direction.</txt></block></li></list></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_3630943b-fe3a-487d-b3d2-da0e0c2177a9" id="ch.4-pt.5-div.5-sdiv.2"><no>Subdivision 2</no><heading guid="_d2e8ce87-1fc3-4fb7-815b-78ae2759a09a" id="ch.4-pt.5-div.5-sdiv.2-he">Outcomes, budget and planning</heading><clause affected.by.uncommenced="0" guid="_825a1419-1e97-4856-98b1-3bd91e44ba36" id="sec.102ZF" provision.type="other" spent.amends="0"><no>102ZF </no><heading guid="_81c8a2c3-06d7-4ab3-86cb-89c3cfa05831" id="sec.102ZF-he">Regulation may prescribe outcomes to be achieved</heading><subclause affected.by.uncommenced="0" guid="_1d8b36f8-4650-4008-ba1e-1fe942182ead" id="sec.102ZF-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A regulation may prescribe outcomes to be achieved by the Organisation, during a period stated in the regulation, relating to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2517aeb7-dd09-44af-93ba-8ed433b2d033" id="sec.102ZF-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the Organisation’s functions, including, for example, outcomes relating to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_40e61086-55f2-42be-ab7e-00c395e21be3" id="sec.102ZF-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the recovery and recycling of containers under the scheme; or</txt></block></li><li guid="_eca1b4f1-6a5b-4bfc-a7fa-224eec1493d3" id="sec.102ZF-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the accessibility of container refund points to members of the public; or</txt></block></li></list></block></li><li guid="_d39d998e-0250-4045-b00f-05e6d627c2f9" id="sec.102ZF-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">administering the scheme in a way that provides opportunities for social enterprise, innovation and the development of technology.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5658ba68-c423-49d7-ad3d-9913fe996334" id="sec.102ZF-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Organisation must use its best endeavours to achieve an outcome prescribed under <intref check="valid" refid="sec.102ZF-ssec.1" target.guid="_1d8b36f8-4650-4008-ba1e-1fe942182ead">subsection (1)</intref>.</txt><note guid="_cdda262f-7849-46ea-a905-175c8151f018" id="sec.102ZF-ssec.2-note" type="example"><heading guid="_13841d3e-5b9c-41ba-8b44-4358128185ad" id="sec.102ZF-ssec.2-note-he">Note for <intref check="valid" refid="sec.102ZF-ssec.2" target.guid="_5658ba68-c423-49d7-ad3d-9913fe996334">subsection (2)</intref>—</heading><block><txt break.before="1">Failure to use best endeavours to achieve an outcome is not an offence but may be a ground for suspending or cancelling a company’s appointment as the Organisation. See <intref check="valid" refid="sec.102V" target.guid="_9018d73b-ed90-4eb0-a24c-47f4d1c51cbd">section 102V</intref>.</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_685c816e-0938-4c54-8caf-6e9df54fdd11" id="sec.102ZG" provision.type="other" spent.amends="0"><no>102ZG </no><heading guid="_e025bde7-37c8-4c19-b60d-a553a5c94489" id="sec.102ZG-he">Annual budget, strategic plan and operational plan</heading><subclause affected.by.uncommenced="0" guid="_d668239d-c80e-4bc6-bdb4-42abf2480044" id="sec.102ZG-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Before 31 March each year, the Organisation must prepare, in the way prescribed by regulation, and give the Minister the following documents—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_968bfc0b-fcc4-45c8-8035-42cfccdd1b58" id="sec.102ZG-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a budget of estimated costs of the scheme for the next financial year, including the estimated costs of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_79d43dd2-1aa4-4165-a67b-54eb1c5724bb" id="sec.102ZG-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the Organisation; and</txt></block></li><li guid="_dfb4a501-61f6-4b55-8768-194e71b76905" id="sec.102ZG-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">refund amounts to be paid for empty beverage containers under the scheme; and</txt></block></li><li guid="_6ac6a475-efaa-4cf3-9a57-4642b4a71298" id="sec.102ZG-ssec.1-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the operation of container refund points, including handling, sorting and transporting empty beverage containers for recycling;</txt></block></li></list></block></li><li guid="_210706de-e51e-4bab-9e1c-5d66c59fbac0" id="sec.102ZG-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a strategic plan;</txt></block></li><li guid="_8030e4b4-8763-4a09-9e7a-38a36234debe" id="sec.102ZG-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">an operational plan.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_504b207e-674c-44a9-becc-36ad3ecfe40e" id="sec.102ZG-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">During a financial year, the Organisation may amend its budget, strategic plan or operational plan for that year.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_468c100f-d1d3-4c4c-8407-f26fcda916d9" id="sec.102ZG-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Organisation must give the amended budget, strategic plan or operational plan to the Minister within 10 business days after making the amendment.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_68849b15-e440-4535-88b3-f474978ab768" id="sec.102ZH" provision.type="other" spent.amends="0"><no>102ZH </no><heading guid="_aa9c2323-2520-42ab-8048-cdae095b1900" id="sec.102ZH-he">Approval of strategic plan</heading><subclause affected.by.uncommenced="0" guid="_e4a6ea34-296e-43bd-a774-0eec9c2b4769" id="sec.102ZH-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Organisation’s strategic plan has no effect until it has been approved by the Minister.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6e67f08f-0089-4895-8e16-834c38254682" id="sec.102ZH-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister must approve the strategic plan as soon as practicable after receiving the plan.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5513b176-8f34-4ce2-b5a9-81d8c6a80725" id="sec.102ZH-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">An amendment to a strategic plan has no effect until it has been approved by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ce6fd0c0-f97c-40db-828e-c63abba69246" id="sec.102ZH-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for a minor amendment—the Organisation; or</txt></block></li><li guid="_4c71386a-0e08-42f5-ab7f-29da261466bf" id="sec.102ZH-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—the Minister.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a1244e01-0632-415b-9536-331c0817e6ac" id="sec.102ZH-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_fc665cb9-543a-4f16-9297-f75d2c4d4858" id="sec.102ZH-ssec.4-def.minoramendment_"><txt break.before="1"><defterm guid="_77a9780b-5dfa-40ef-93bf-592c96879b02" id="sec.102ZH-ssec.4-def.minoramendment" type="definition">minor amendment</defterm>, of a strategic plan, means an amendment of a minor nature that does not materially change the plan.</txt></definition></deflist></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_77874700-07c1-485a-829a-af1f5ce33aa4" id="ch.4-pt.5-div.5-sdiv.3"><no>Subdivision 3</no><heading guid="_b22bdf57-6d30-47d4-a1b3-a6820528ea72" id="ch.4-pt.5-div.5-sdiv.3-he">Reporting</heading><clause affected.by.uncommenced="0" guid="_f1aeb144-82ca-4d79-84c0-dba3b29b7a8f" id="sec.102ZI" provision.type="other" spent.amends="0"><no>102ZI </no><heading guid="_e6e9e0f8-53fd-40ec-a304-048e043350c9" id="sec.102ZI-he">Quarterly reports</heading><subclause affected.by.uncommenced="0" guid="_ceb87c78-f5a9-4815-b910-4d59149306f4" id="sec.102ZI-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Organisation must give the Minister a report about its operations for each quarter in a financial year.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_dd42ffa8-9c7e-49c3-ab7b-0880489f9a06" id="sec.102ZI-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The report for a quarter must be given to the Minister—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_75449597-c8a4-4ba9-9c0c-2e0ed562e864" id="sec.102ZI-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">within 6 weeks after the end of the quarter; or</txt></block></li><li guid="_3bc2ede1-9354-4662-914e-c15aaa449da3" id="sec.102ZI-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if another period after the end of the quarter is agreed between the Organisation and the Minister—within the agreed period.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_dcb96af4-dc37-48a2-af15-785536568c92" id="sec.102ZI-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The report must include the information—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_553cd3a3-12b1-4109-80d8-ed5b358b0c6e" id="sec.102ZI-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">stated in the Organisation’s strategic plan; or</txt></block></li><li guid="_af46abc9-38a2-4d60-abce-8adfbe58495d" id="sec.102ZI-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">prescribed by regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a2c3b526-38cf-4a9b-9ecd-ce9d4215d7cc" id="sec.102ZI-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_0ba69a21-3a9d-4b5f-bf71-555a6cdadc55" id="sec.102ZI-ssec.4-def.quarter_"><txt break.before="1"><defterm guid="_d7d3a072-005e-4d7b-8246-6f5a0d16ecf5" id="sec.102ZI-ssec.4-def.quarter" type="definition">quarter</defterm>, in a financial year, means the following periods in the year—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5ab4d134-46cd-4f7f-b0f7-1326a3518bba" id="sec.102ZI-ssec.4-def.quarter-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">1 July to 30 September;</txt></block></li><li guid="_06adc0a9-cc1c-4748-8711-6df7c0776ad9" id="sec.102ZI-ssec.4-def.quarter-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">1 October to 31 December;</txt></block></li><li guid="_3af95e87-3b14-4c78-b112-90c6bf28c632" id="sec.102ZI-ssec.4-def.quarter-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">1 January to 31 March;</txt></block></li><li guid="_cd286c50-5d2e-4890-b6fd-025786550c75" id="sec.102ZI-ssec.4-def.quarter-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">1 April to 30 June.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_17829a70-b4d2-47e7-a436-6c344fb26ab7" id="sec.102ZJ" provision.type="other" spent.amends="0"><no>102ZJ </no><heading guid="_e3bc3820-7820-47a2-8321-a78ff08e7780" id="sec.102ZJ-he">Annual report</heading><subclause affected.by.uncommenced="0" guid="_32729ce6-b443-498c-aa48-5c2e48f71a85" id="sec.102ZJ-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Organisation must give the Minister a report about its operations for each financial year.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e1b96883-0d64-4463-acf4-f1cd8d09d0ca" id="sec.102ZJ-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An annual report for a financial year must be given to the Minister by 30 September after the end of the financial year.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c6491d24-eb1c-47db-a71d-ce0c18d34f39" id="sec.102ZJ-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">An annual report for a financial year must include the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ef7e92fd-e2a9-411f-adf2-84cfd37781ca" id="sec.102ZJ-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">annual financial statements for the year that have been audited by a third-party auditor;</txt></block></li><li guid="_2d3a7f86-5159-4c7e-ba53-dbba6332a3fc" id="sec.102ZJ-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">details of the Organisation’s achievements during the year of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_25de2359-2856-41fb-90d2-ff596f1e075e" id="sec.102ZJ-ssec.3-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the objectives in its strategic and operational plans; or</txt></block></li><li guid="_f866da44-3e82-4929-9811-06cca131d445" id="sec.102ZJ-ssec.3-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">an outcome prescribed under <intref check="valid" refid="sec.102ZF" target.guid="_825a1419-1e97-4856-98b1-3bd91e44ba36">section 102ZF</intref>;</txt></block></li></list></block></li><li guid="_4cbbd5dc-d050-404e-bffc-0bb3d8e9aa57" id="sec.102ZJ-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the information—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_03d4760e-8186-491d-92fb-93286bba5a1b" id="sec.102ZJ-ssec.3-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">stated in the Organisation’s strategic plan; or</txt></block></li><li guid="_94395eed-339b-41fe-a1df-1cad160825cb" id="sec.102ZJ-ssec.3-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">prescribed by regulation.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c4867778-3ed6-43be-814b-ea97f8fc966d" id="sec.102ZJ-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_6ea4e239-7ee9-4774-84e0-a9f480c7fe40" id="sec.102ZJ-ssec.4-def.thirdpartyauditor_"><txt break.before="1"><defterm guid="_861bf342-9859-46e1-859e-890f79880f91" id="sec.102ZJ-ssec.4-def.thirdpartyauditor" type="definition">third-party auditor</defterm> means a person who—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bae21489-cdd7-404a-b449-5b45f54168bb" id="sec.102ZJ-ssec.4-def.thirdpartyauditor-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is appropriately qualified to audit the Organisation’s annual financial statements; and</txt></block></li><li guid="_746b8faa-81a6-4d9d-b7c2-b3a0111a9e94" id="sec.102ZJ-ssec.4-def.thirdpartyauditor-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is not an executive officer or business associate of the Organisation.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_05e3ad34-05cd-4d7a-9947-d813bdc43661" id="sec.102ZK" provision.type="other" spent.amends="0"><no>102ZK </no><heading guid="_1b27e38f-e6da-4240-a322-424a5773a47d" id="sec.102ZK-he">Organisation must inform Minister</heading><block><txt break.before="1">The Organisation must immediately inform the Minister about any matter that the Organisation considers may—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a0173172-129e-4d38-a1e4-ca8e51fad932" id="sec.102ZK-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">prevent, or significantly affect, its achievement of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_45181654-cf85-4228-9263-db6033101cf9" id="sec.102ZK-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the objectives in its strategic and operational plans; or</txt></block></li><li guid="_efca9dff-5aff-4c66-83d8-1f8f0394a5b6" id="sec.102ZK-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">an outcome prescribed under <intref check="valid" refid="sec.102ZF" target.guid="_825a1419-1e97-4856-98b1-3bd91e44ba36">section 102ZF</intref>; or</txt></block></li></list></block></li><li guid="_99e235b6-1307-4a8d-9968-b9605d206d38" id="sec.102ZK-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">significantly impact on—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_096dbb54-13cc-4a14-a40c-83d50644714e" id="sec.102ZK-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">its performance of its functions; or</txt></block></li><li guid="_e4890c6a-5016-428c-8e0b-c0bcee9098b3" id="sec.102ZK-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">its financial position or viability; or</txt></block></li><li guid="_3591fd15-6a59-442c-b9a6-72abfd1f66b5" id="sec.102ZK-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">public confidence in the integrity of the scheme.</txt></block></li></list></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_8306247f-e25a-4a4c-b27b-fcb3cbf7facc" id="sec.102ZL" provision.type="other" spent.amends="0"><no>102ZL </no><heading guid="_606e4da1-552d-49a3-811e-4ee6ac101c18" id="sec.102ZL-he">Reporting to chief executive</heading><subclause affected.by.uncommenced="0" guid="_59b1f558-8bbe-45e0-aeb8-c77f48c8b38c" id="sec.102ZL-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may act under this section for the purpose of monitoring, assessing or reporting on the Organisation’s performance of its functions.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7393958d-75bf-4e35-8636-aaab99c231cd" id="sec.102ZL-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister may require the Organisation to report to the chief executive by, for example, giving stated information at stated times to the chief executive.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bd61388c-c740-49a3-8532-6c2bb510523b" id="sec.102ZL-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Organisation must comply with the requirement.</txt><note guid="_7358dbb1-59df-40e1-b527-dca80c89a544" id="sec.102ZL-ssec.3-note" type="example"><heading guid="_6d910745-1e1d-47e2-be0b-233cf4363396" id="sec.102ZL-ssec.3-note-he">Note—</heading><block><txt break.before="1">Failure to comply with the requirement is not an offence but may be a ground for suspending or cancelling a company’s appointment as the Organisation. See <intref check="valid" refid="sec.102V" target.guid="_9018d73b-ed90-4eb0-a24c-47f4d1c51cbd">section 102V</intref>.</txt></block></note></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_40ebac05-2ea7-453b-b3d7-1d13fa0fe10d" id="ch.4-pt.5-div.5-sdiv.4"><no>Subdivision 4</no><heading guid="_682d3639-ecb4-4dbf-9230-2e389cc8c143" id="ch.4-pt.5-div.5-sdiv.4-he">General</heading><clause affected.by.uncommenced="0" guid="_e6589312-ee20-4bd1-806c-cce1aa3d5044" id="sec.102ZM" provision.type="other" spent.amends="0"><no>102ZM </no><heading guid="_fb3ea65b-b9f7-4e76-9139-c703aeb89e81" id="sec.102ZM-he">Requirement to implement plans in application</heading><subclause affected.by.uncommenced="0" guid="_1354685a-ef07-48c0-81b1-089dc72c1df5" id="sec.102ZM-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Organisation must implement its plans for the following matters as stated in its application for appointment as the Organisation—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_820b9809-18e5-4ddb-a774-80ffde664538" id="sec.102ZM-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">establishing and administering the scheme generally;</txt></block></li><li guid="_9c147be6-9c99-4c10-9cc6-0cccd8bc3314" id="sec.102ZM-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">entering into container recovery agreements with manufacturers of beverage products;</txt></block></li><li guid="_9346aafb-e89c-4f27-b23a-6743471350e4" id="sec.102ZM-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">establishing a network of container refund points;</txt></block></li><li guid="_ae32c4e5-2230-4a89-b104-b86d4133d18e" id="sec.102ZM-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">entering into container collection agreements with the operators of container refund points;</txt></block></li><li guid="_5ed6392c-4ac1-4ad0-ab2d-d86e6cbb0776" id="sec.102ZM-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">achieving any outcomes stated in the Minister’s invitation under <intref check="valid" refid="sec.102D" target.guid="_b3178608-49b0-4b11-937c-df09e96c58c5">section 102D</intref>;</txt></block></li><li guid="_5f752cd3-a8a3-4dab-9a17-cf662d7b16b6" id="sec.102ZM-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">setting the amounts payable under the scheme mentioned in <intref check="valid" refid="sec.99J" target.guid="_55a74d53-7e14-4513-93ed-7220295bff9f">section 99J</intref><intref check="valid" refid="sec.99J-ssec.2" target.guid="_06868b1c-55f5-41a5-bdb4-9b3fd7acc07e">(2)</intref><intref check="valid" refid="sec.99J-ssec.2-para1.d" target.guid="_7dc94e42-6973-4315-b57b-c138e2749109">(d)</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ab22479a-3d13-4f5e-adc4-ccadb26b53c6" id="sec.102ZM-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Organisation must establish and operate a container refund point in a community if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c30f910e-cf88-451a-a8c0-9f9a17682f32" id="sec.102ZM-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">persons in the community do not have reasonable access to a container refund point; and</txt></block></li><li guid="_4b2ad14e-e741-4e29-90ad-2b8a87cafc26" id="sec.102ZM-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Organisation has not identified another person with whom to enter into a container collection agreement to operate a container refund point in the community.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_feb19aff-c5ac-4fee-a819-9f884575fb94" id="sec.102ZM-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">This section applies subject to a condition of the Organisation’s appointment.</txt></block></subclause><note guid="_d063dbb5-c834-4a15-885d-95755af3c110" id="sec.102ZM-note" type="example"><heading guid="_47a9c355-202a-4962-8085-2c0224e09778" id="sec.102ZM-note-he">Note—</heading><block><txt break.before="1">Failure to comply with this section is not an offence but may be a ground for suspending or cancelling a company’s appointment as the Organisation. See <intref check="valid" refid="sec.102V" target.guid="_9018d73b-ed90-4eb0-a24c-47f4d1c51cbd">section 102V</intref>.</txt></block></note></clause><clause affected.by.uncommenced="0" guid="_23a151fa-8edd-433a-94d3-3a3b0858a9cc" id="sec.102ZN" provision.type="other" spent.amends="0"><no>102ZN </no><heading guid="_a63319cb-375d-4371-9805-350e8b430263" id="sec.102ZN-he">Status as eligible company</heading><subclause affected.by.uncommenced="0" guid="_e0a099c4-2f07-48a7-98e8-ee749a778991" id="sec.102ZN-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Organisation must, in each year, give the chief executive—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8c288ab6-5579-46a4-9518-78ee3cd3f50e" id="sec.102ZN-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a notice about whether the Organisation is, and has been during the previous year, an eligible company; and</txt></block></li><li guid="_47ad7039-1dad-473e-95ae-87c9cc590aa9" id="sec.102ZN-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a copy of the Organisation’s constitution.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0a685fdd-8fb3-4114-9bc3-55e7750c82c9" id="sec.102ZN-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice and copy must be given within 10 business days after the day that is the anniversary of the company’s appointment as the Organisation.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a7a759ce-680d-477c-868a-b7239c9de543" id="sec.102ZO" provision.type="other" spent.amends="0"><no>102ZO </no><heading guid="_2eb1b8a1-6294-4b25-bb6f-4db26b2f603d" id="sec.102ZO-he">Notice of particular events</heading><subclause affected.by.uncommenced="0" guid="_7b28949a-98ad-4b9a-b6b4-de2c7f4135b9" id="sec.102ZO-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If any of the following events happens, the Organisation must give a notice about the event to the chief executive—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4446f0d5-7966-41f3-a4c6-061b0de72215" id="sec.102ZO-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an event that makes the Organisation no longer an eligible company;</txt></block></li><li guid="_64cdcdee-4710-4ef7-85aa-7c1b48dd8bdb" id="sec.102ZO-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an event that makes an executive officer or business associate of the Organisation no longer an eligible individual;</txt></block></li><li guid="_6a98b649-823b-4fee-891d-529804471ea4" id="sec.102ZO-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the appointment or employment of an executive officer of the Organisation ends;</txt></block></li><li guid="_abc493f3-edd3-42f9-b874-235edb2bcf35" id="sec.102ZO-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a person is appointed or employed as an executive officer of the Organisation;</txt></block></li><li guid="_1228eb50-ad93-4d1b-87d5-79fd3d1d9ef1" id="sec.102ZO-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">a shareholder or member of the Organisation stops being a shareholder or member of the Organisation;</txt></block></li><li guid="_76f573a7-ceff-4e8c-a8ab-ddddfbc40a43" id="sec.102ZO-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">a person becomes a shareholder or member of the Organisation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e2a1c0aa-c6b4-447d-808b-778eb0585f69" id="sec.102ZO-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must be given within 10 business days after the event happens.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e1b0987e-872e-422e-9cb5-beef4c59dafc" id="sec.102ZO-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A notice about an event mentioned in <intref check="valid" refid="sec.102ZO-ssec.1" target.guid="_7b28949a-98ad-4b9a-b6b4-de2c7f4135b9">subsection (1)</intref><intref check="valid" refid="sec.102ZO-ssec.1-para1.a" target.guid="_4446f0d5-7966-41f3-a4c6-061b0de72215">(a)</intref> must include the Organisation’s plan and timetable for making the Organisation an eligible company.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5a62127b-433b-43ef-8c9b-7e88adb3ad72" id="sec.102ZO-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A notice about an event mentioned in <intref check="valid" refid="sec.102ZO-ssec.1" target.guid="_7b28949a-98ad-4b9a-b6b4-de2c7f4135b9">subsection (1)</intref><intref check="valid" refid="sec.102ZO-ssec.1-para1.d" target.guid="_abc493f3-edd3-42f9-b874-235edb2bcf35">(d)</intref> or <intref check="valid" refid="sec.102ZO-ssec.1-para1.f" target.guid="_76f573a7-ceff-4e8c-a8ab-ddddfbc40a43">(f)</intref> must be accompanied by the signed consent of the person who is the subject of the notice to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0ca0ec44-8ef3-420a-9de9-96b6e681f7b4" id="sec.102ZO-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the collection of personal or background information about the person by the chief executive; and</txt></block></li><li guid="_f477d204-7686-41b8-8872-d6fb5ac338d3" id="sec.102ZO-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a criminal history check.</txt></block></li></list></block></subclause></clause></subdivision></division><division affected.by.uncommenced="0" guid="_30dfe38b-62f6-454f-8294-9f2dca7c9f62" id="ch.4-pt.5-div.6"><no>Division 6</no><heading guid="_d162e54b-402c-42be-9813-6b7a7bd6260d" id="ch.4-pt.5-div.6-he">Miscellaneous</heading><clause affected.by.uncommenced="0" guid="_f2093381-8203-4b93-8d63-1bae20740534" id="sec.102ZP" provision.type="other" spent.amends="0"><no>102ZP </no><heading guid="_cadb67b2-e3d7-49f0-976c-c7e5751b882a" id="sec.102ZP-he">Delegation</heading><subclause affected.by.uncommenced="0" guid="_f6423253-6a20-4975-b99d-3fc3d3680098" id="sec.102ZP-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Organisation may delegate its functions and powers under this Act to a director or appropriately qualified employee of the Organisation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bead0028-40f0-4035-a106-7e01dbde9d6e" id="sec.102ZP-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive officer of the Organisation (however described) may, with the Organisation’s approval, subdelegate a function delegated to the chief executive officer under <intref check="valid" refid="sec.102ZP-ssec.1" target.guid="_f6423253-6a20-4975-b99d-3fc3d3680098">subsection (1)</intref> to an appropriately qualified employee of the Organisation.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a0ad66ba-c7c8-4f98-b18e-348d20abd979" id="sec.102ZQ" provision.type="other" spent.amends="0"><no>102ZQ </no><heading guid="_8dfdfbb3-3164-4ca0-b2c1-fc9833ecc5a1" id="sec.102ZQ-he">Obtaining the criminal history of an individual</heading><subclause affected.by.uncommenced="0" guid="_3346f246-028b-452d-9642-b432b9d6099b" id="sec.102ZQ-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies in relation to an individual who—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0bac6f97-13b5-4a37-a1dd-784c5a47c669" id="sec.102ZQ-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is an executive officer or business associate of the Organisation or an applicant under <intref check="valid" refid="ch.4-pt.5-div.2" target.guid="_b93bb7b0-f457-4073-a9b8-82da7ae5d911">division 2</intref>; and</txt></block></li><li guid="_713d9249-cb28-4600-926e-d0e96d97975e" id="sec.102ZQ-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">has given written consent to the chief executive obtaining the individual’s criminal history.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_68b44fec-d3dd-4ec6-bb37-ab6579ec71c4" id="sec.102ZQ-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may ask the commissioner of the police service for a written report about the individual’s criminal history, including a brief description of the circumstances of any conviction mentioned in the individual’s criminal history.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e35597ec-55a1-4063-b695-9a94eda03889" id="sec.102ZQ-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">After receiving the request, the police commissioner must give the report about the individual’s criminal history to the chief executive.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ef2c1700-791d-4019-85fe-639607ff66d1" id="sec.102ZQ-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, the duty imposed on the police commissioner applies only to information in the commissioner’s possession or to which the commissioner has access.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8b0979f8-2921-4e91-a660-53befab3b2a9" id="sec.102ZR" provision.type="other" spent.amends="0"><no>102ZR </no><heading guid="_db11bff5-5968-40a5-a4cd-1bb7d9ea3f9b" id="sec.102ZR-he"><legref check="invalid" jurisd="CTH" type="act"><name emphasis="no">Corporations Act</name></legref> displacement</heading><block><txt break.before="1">A provision of this part, to the extent the provision is incapable of concurrent operation with a provision of the <legref check="invalid" jurisd="CTH" type="act"><name emphasis="no">Corporations Act</name></legref>, is declared to be a Corporations legislation displacement provision for <legref check="invalid" jurisd="CTH" refid="sec.5G" type="act">section 5G</legref> of that Act.</txt><note guid="_895cfe76-7fcb-426d-a57b-d8b8bf8ec285" id="sec.102ZR-note" type="example"><heading guid="_0a9a394c-3a59-47b8-bde5-9a4de9b87c3d" id="sec.102ZR-note-he">Note—</heading><block><txt break.before="1"><legref check="invalid" jurisd="CTH" refid="sec.5G" type="act">Section 5G</legref> of the <legref check="invalid" jurisd="CTH" type="act"><name emphasis="no">Corporations Act</name></legref> provides that if a State law declares a provision of a law of a State to be a Corporations legislation displacement provision, any provision of the Corporations legislation with which the State provision would otherwise be inconsistent does not apply to the extent necessary to avoid the inconsistency.</txt></block></note></block></clause></division></part></chapter><chapter affected.by.uncommenced="0" guid="_5066fa95-ea51-4166-901c-6addeb01c451" id="ch.5"><no>Chapter 5</no><heading guid="_8d67b83c-a8fa-46de-aaa2-303ce3c61b7d" id="ch.5-he">Offences relating to littering and illegal dumping</heading><part affected.by.uncommenced="0" guid="_b187146f-968e-4b5d-9695-94ec0da8b737" id="ch.5-pt.1"><no>Part 1</no><heading guid="_08d0f087-0ea6-41e6-81fc-8e4add4f12dd" id="ch.5-pt.1-he">Basic littering and illegal dumping offences</heading><clause affected.by.uncommenced="0" guid="_88ee3b31-e48a-4927-89f5-5ffb72f072b6" id="sec.103" provision.type="other" spent.amends="0"><no>103</no><heading guid="_eb76ac07-3d9e-4f2a-926b-db0eb96dafc2" id="sec.103-he">General littering provision</heading><subclause affected.by.uncommenced="0" guid="_955200d4-8fb9-4cae-9c63-97b3252973a4" id="sec.103-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not litter at a place.</txt></block><penalty guid="_a7e46e3b-07c9-4536-a06c-653493093a4e" id="sec.103-ssec.1-pen"><block><txt break.before="1">Maximum penalty—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7ec3c6b4-380c-4011-8f0f-9217500d212e" id="sec.103-ssec.1-pen-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the offence involves dangerous littering—40 penalty units; or</txt></block></li><li guid="_497a673e-fb8d-4004-b400-c8e87877f82c" id="sec.103-ssec.1-pen-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—30 penalty units.</txt></block></li></list></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_e8fc9b03-f43c-4dbb-b8a0-1293a997c2df" id="sec.103-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.103-ssec.1" target.guid="_955200d4-8fb9-4cae-9c63-97b3252973a4">subsection (1)</intref>, a person litters at a place if the person deposits at the place an amount of waste that is less than 200L in volume.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7ea64c88-93a4-420e-851a-a861ecb3be4b" id="sec.103-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, a person who deposits at a place an amount of waste of less than 200L in volume (the <defterm guid="_fef52421-e508-46b6-a2e2-75c7ef9ae15b" id="sec.103-def.relevantwaste" type="definition">relevant waste</defterm>) does not litter at the place if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b6d7e449-5667-486d-ada7-86d9ca629259" id="sec.103-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the person is an occupier of the place; or</txt></block></li><li guid="_2332e3ef-7686-4dcd-b4c5-f1cebb130c45" id="sec.103-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the person deposits the relevant waste with the consent of an occupier of the place; or</txt></block></li><li guid="_2ce7a9ef-87d0-4605-b700-e35669fcc161" id="sec.103-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the person deposits the relevant waste by placing it in a bin or other container provided by an occupier of the place, or by another person with the agreement of an occupier, for the purpose of depositing the relevant waste.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c6c6c13e-0d01-46ef-b7a3-29c77cf8704e" id="sec.103-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Despite <intref check="valid" refid="sec.103-ssec.3" target.guid="_7ea64c88-93a4-420e-851a-a861ecb3be4b">subsection (3)</intref>, a person who deposits at a place on a road an amount of waste of less than 200L in volume (also the <defterm guid="_749622aa-900f-4555-8578-30d95f49b48a" id="sec.103-def.relevantwaste-oc.2" type="definition">relevant waste</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4c246b54-1d8b-4aa7-99d9-fabc05077fc8" id="sec.103-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">commits an offence under <intref check="valid" refid="sec.103-ssec.1" target.guid="_955200d4-8fb9-4cae-9c63-97b3252973a4">subsection (1)</intref> even if the person is an occupier of the place, or deposits the relevant waste with the consent of an occupier of the place; but</txt></block></li><li guid="_6d27407c-9830-445e-9db5-ee68a0d1f6aa" id="sec.103-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">does not commit an offence under <intref check="valid" refid="sec.103-ssec.1" target.guid="_955200d4-8fb9-4cae-9c63-97b3252973a4">subsection (1)</intref> if the person deposits the waste by placing it in a bin or other container provided by an occupier of the place, or by another person with the agreement of an occupier, and located at the place, for the purpose of depositing the relevant waste.</txt></block></li></list><note guid="_3e539d98-c2d2-4573-b7e9-a421dc11a2b5" id="sec.103-ssec.4-note" type="example"><heading guid="_7fc87ec4-3ad6-4b8d-8beb-95db825b83d3" id="sec.103-ssec.4-note-he">Example for <intref check="valid" refid="sec.103-ssec.4" target.guid="_c6c6c13e-0d01-46ef-b7a3-29c77cf8704e">subsection (4)</intref>—</heading><block><txt break.before="1">A person would commit an offence under <intref check="valid" refid="sec.103-ssec.1" target.guid="_955200d4-8fb9-4cae-9c63-97b3252973a4">subsection (1)</intref> if the person, on a road under the control of a local government, deposited 50L of waste in a waste bin placed on the road by a road maintenance contractor, with the local government’s agreement, for the purpose of collecting waste road material.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_412f65eb-6b33-41bf-8e67-839898e430b6" id="sec.103-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_b99eab47-33dc-4e7b-8065-b4ed786abd2d" id="sec.103-ssec.5-def.dangerouslittering_"><txt break.before="1"><defterm guid="_8a6e9b4a-db48-462f-8341-6acc1d3006b5" id="sec.103-ssec.5-def.dangerouslittering" type="definition">dangerous littering</defterm> means depositing waste that causes or is likely to cause harm to a person, property or the environment.</txt><note guid="_8d5cc914-078a-4c5a-bd40-fb10cf9c55a6" id="sec.103-ssec.5-def.dangerouslittering-note" type="example"><heading guid="_da4bc5a5-0c05-45bc-8167-66a126d8bbac" id="sec.103-ssec.5-def.dangerouslittering-note-he">Examples of dangerous littering—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_2537440c-143d-4d21-981c-0b18bb5e46ff" id="sec.103-ssec.5-def.dangerouslittering-note-para1" provision.type="other"><no>•</no><block><txt break.before="0">throwing a lit cigarette onto dry grass in extreme fire danger conditions</txt></block></li><li guid="_1f21f200-1d6a-40bb-a758-bc7f94f4bb6e" id="sec.103-ssec.5-def.dangerouslittering-note-para1-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">smashing a bottle and leaving the broken glass on a footpath</txt></block></li><li guid="_122dd6a4-2280-4ee3-9dbf-a3a256ef3ba3" id="sec.103-ssec.5-def.dangerouslittering-note-para1-oc.3" provision.type="other"><no>•</no><block><txt break.before="0">leaving a syringe in a public place other than in a container intended for receiving used syringes</txt></block></li></list></block></note></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_428f4a48-281f-4088-8124-b981fb6fd86a" id="sec.104" provision.type="other" spent.amends="0"><no>104</no><heading guid="_5e3019ed-4bc3-4e97-9e80-33b8aaed2401" id="sec.104-he">Illegal dumping of waste provision</heading><subclause affected.by.uncommenced="0" guid="_d4b52884-8745-4059-bece-7159bd221cc0" id="sec.104-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not illegally dump waste at a place.</txt></block><penalty guid="_695873d2-3897-4810-a1b5-8f7483c930ad" id="sec.104-ssec.1-pen"><block><txt break.before="1">Maximum penalty—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f6472486-17d5-4a41-8346-24253ba811cf" id="sec.104-ssec.1-pen-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the offence involves depositing a volume of less than 2,500L of waste—400 penalty units; or</txt></block></li><li guid="_c21bc1ce-bb5e-439b-9acb-c4c0b78e40c6" id="sec.104-ssec.1-pen-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the offence involves depositing a volume of 2,500L or more of waste—whichever is the greater of the following amounts—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_347a5611-f657-4989-a149-46d4e3e302f5" id="sec.104-ssec.1-pen-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">1,000 penalty units;</txt></block></li><li guid="_d742f065-0d39-4ef0-9e8c-f4f5734879d7" id="sec.104-ssec.1-pen-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a fine that is twice the waste levy amount that would have been payable, when the waste was dumped, by the operator of a levyable waste disposal site if the waste had been delivered to the site.</txt></block></li></list></block></li></list></block></penalty><note guid="_aee4ca8f-8290-4571-b44f-a9ff43217ec9" id="sec.104-ssec.1-note" type="example"><heading guid="_9e501c90-93dc-4304-b9a2-1acebc20e393" id="sec.104-ssec.1-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.268" target.guid="_50bb8430-47e8-4c4a-bf17-3c946855ae54">section 268</intref>, to have also committed the offence.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_c12fec73-d2fe-42cb-a7bc-4665ef6cf499" id="sec.104-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.104-ssec.1" target.guid="_d4b52884-8745-4059-bece-7159bd221cc0">subsection (1)</intref>, a person illegally dumps waste at a place if the person deposits at the place an amount of waste that is 200L or more in volume.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5abf6d36-c829-4e17-8480-7c9e954872aa" id="sec.104-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, a person who deposits at a place an amount of waste of 200L or more in volume (the <defterm guid="_9f761d60-5f3b-4a8f-aa77-bc089248e2e4" id="sec.104-def.relevantwaste" type="definition">relevant waste</defterm>) does not illegally dump the relevant waste if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8e5155d6-116f-4e2f-a12b-08098971afe0" id="sec.104-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the person is an occupier of the place; or</txt></block></li><li guid="_349907ee-1835-4863-94f0-81a6e1011441" id="sec.104-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the person deposits the relevant waste with the consent of an occupier of the place; or</txt></block></li><li guid="_4443487a-81e5-4be1-bd91-cd471877747f" id="sec.104-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the person deposits the waste by placing it in a bin or other container provided by an occupier of the place, or by another person with the agreement of an occupier, for the purpose of depositing the relevant waste.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0ec8adb1-fbaf-457a-b5e5-765404914ef3" id="sec.104-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Despite <intref check="valid" refid="sec.104-ssec.3" target.guid="_5abf6d36-c829-4e17-8480-7c9e954872aa">subsection (3)</intref>, a person who deposits at a place on a road an amount of waste of 200L or more in volume (also the <defterm guid="_f93454ca-6e64-4d14-8170-6418f78786b5" id="sec.104-def.relevantwaste-oc.2" type="definition">relevant waste</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_003ef8d2-8be6-4091-b013-ff15cab45b87" id="sec.104-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">commits an offence under <intref check="valid" refid="sec.104-ssec.1" target.guid="_d4b52884-8745-4059-bece-7159bd221cc0">subsection (1)</intref> even if the person is an occupier of the place, or deposits the relevant waste with the consent of an occupier of the place; but</txt></block></li><li guid="_7f786727-ae3e-4842-bbd3-1a7c0a40a8bc" id="sec.104-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">does not commit an offence under <intref check="valid" refid="sec.104-ssec.1" target.guid="_d4b52884-8745-4059-bece-7159bd221cc0">subsection (1)</intref> if the person deposits the relevant waste by placing it in a bin or other container provided by an occupier of the place, or by another person with the agreement of an occupier, and located at the place, for the purpose of depositing the relevant waste.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_94ad1cc7-8aa3-4ed1-a4f6-28f2913efc3f" id="sec.104-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Two or more deposits of waste at a place are taken to be 1 deposit of waste for this section if they together constitute a connected series of deposits.</txt><note guid="_e99a07ab-4a4a-4edd-ac52-4fd983c8987f" id="sec.104-ssec.5-note" type="example"><heading guid="_bccfb868-2f14-467e-ac89-e82249c55e9b" id="sec.104-ssec.5-note-he">Example—</heading><block><txt break.before="1">A connected series of 3 deposits of waste at a place, each of a volume of approximately 80L, would constitute the deposit at the place of an amount of waste that is more than 200L in volume.</txt></block></note></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_4a91b1fd-5a7f-4a48-a381-c25a437633e0" id="ch.5-pt.2"><no>Part 2</no><heading guid="_cf855791-201f-4b49-9ab7-aaa12d50d899" id="ch.5-pt.2-he">Material that may become waste</heading><clause affected.by.uncommenced="0" guid="_285a6f07-9e48-4f36-ac7d-1ff5846819bf" id="sec.105" provision.type="other" spent.amends="0"><no>105</no><heading guid="_10185054-c6d6-4ddf-a79f-78f907d82450" id="sec.105-he">What is <defterm guid="_2ca121f5-e49c-4a42-90a8-1b61b95e7b94" type="mention">advertising material</defterm></heading><subclause affected.by.uncommenced="0" guid="_dbec70c7-8e68-4aff-83c2-9f5d153d6d60" id="sec.105-ssec.1" provision.type="other"><no>(1)</no><block><deflist><definition affected.by.uncommenced="0" guid="_d22d28ff-2c6c-4b77-b924-c1f47be4729b" id="sec.105-ssec.1-def.Advertisingmaterial_"><txt break.before="0"><defterm guid="_1c8d0063-dd41-422c-92f1-f37805ef5e4d" id="sec.105-ssec.1-def.Advertisingmaterial" type="definition">Advertising material</defterm> means any of the following, if it includes any form of advertising for a commercial purpose—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ba1408d6-db07-44b8-baf1-31ad6f09090f" id="sec.105-ssec.1-def.Advertisingmaterial-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a circular, a flyer, promotional matter, information or a letter;</txt></block></li><li guid="_1d6f0396-c85b-4937-b37f-86130a593e3c" id="sec.105-ssec.1-def.Advertisingmaterial-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a newspaper, magazine or other publication distributed without charge to intended readers.</txt></block></li></list></definition></deflist></block></subclause><subclause affected.by.uncommenced="0" guid="_0106ae55-d070-4723-856d-dc62c29d08ac" id="sec.105-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_cd943b74-466e-4ff6-bbf2-fb28c947002e" id="sec.105-ssec.2-def.flyer_"><txt break.before="1"><defterm guid="_14ecfacb-7687-4807-9219-6b0e7f9a7f09" id="sec.105-ssec.2-def.flyer" type="definition">flyer</defterm> means a single sheet of printed material circulated to announce an event, promote a cause or advertise a product.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_db9110bc-ddb2-4afd-9b94-2008aaa5e9d1" id="sec.106" provision.type="other" spent.amends="0"><no>106</no><heading guid="_6037c14b-6bbd-482e-90ed-a84a5eee6986" id="sec.106-he">What is <defterm guid="_e6c5e302-4cf9-4689-9f6d-2502b1cfc2fa" type="mention">unsolicited advertising material</defterm> for premises</heading><subclause affected.by.uncommenced="0" guid="_835bde94-3a3a-4ea3-9207-297f1fee92e8" id="sec.106-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Advertising material is <defterm guid="_986c0920-f6cd-438f-9bce-119b41fee828" id="sec.106-def.unsolicitedadvertisingmaterial-oc.2" type="definition">unsolicited advertising material</defterm> for premises if it is not addressed by name to an owner or occupier of the premises or to a person who is otherwise lawfully at the premises from time to time.</txt><note guid="_d773c228-8b86-4426-9ad5-458c4ebb58e7" id="sec.106-ssec.1-note" type="example"><heading guid="_ffffe22e-0823-4996-9435-7c3390b11fa1" id="sec.106-ssec.1-note-he">Examples of unsolicited advertising material—</heading><block><txt break.before="1">advertising material addressed only as ‘To the householder’ or ‘To the occupier’</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_b1addbd2-2a0a-40c2-b6e8-5912608085d8" id="sec.106-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the following are not <defterm guid="_af0cf3bb-e91a-4510-8420-780b4fc43ea8" id="sec.106-def.unsolicitedadvertisingmaterial-oc.3" type="definition">unsolicited advertising material</defterm> for premises—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_935c27eb-7af4-46d3-8fb1-634a3fc7c7ca" id="sec.106-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a newspaper delivered to the premises, unless the owner or occupier of the premises has advised the publisher or distributor of the newspaper that the owner or occupier does not wish to receive the newspaper;</txt></block></li><li guid="_0c3af177-f4f5-4494-8e6b-dc161fa92de5" id="sec.106-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">material folded or inserted into a newspaper delivered to the premises if under this subsection the newspaper is not unsolicited advertising material for the premises.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_73a3990f-ec42-4086-8690-6fcd166c1cb1" id="sec.107" provision.type="other" spent.amends="0"><no>107</no><heading guid="_dca2e367-7f6b-4ba6-8265-6bf8f2b9d4c0" id="sec.107-he">Unlawful delivery provision</heading><subclause affected.by.uncommenced="0" guid="_7ed3da33-3360-441c-9033-b8dff3bc9a9e" id="sec.107-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not deliver to premises any unsolicited advertising material for the premises if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1fad5d2d-c937-4851-8b22-32d4e07a2727" id="sec.107-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">on an exterior receptacle or other place for receiving mail for the premises, or on a boundary fence or gate adjoining the footpath or other public access point for the premises, there is a legible sign or marking; and</txt></block></li><li guid="_f891a3dd-d17f-45d2-9b34-cb5e9f8c9972" id="sec.107-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the sign or marking states ‘No Advertising Material’, ‘No Junk Mail’, ‘Australia Post Mail Only’ or words to similar effect or otherwise contains any words in English indicating, expressly or by implication, that unsolicited advertising material for the premises is not to be delivered to the premises; and</txt></block></li><li guid="_c8afe7e1-ae89-490f-a00e-42f9c5e671b9" id="sec.107-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the sign or marking is clearly visible to a person delivering the advertising material to the premises.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b437b596-8c5d-494c-9bf7-7ed8b28d06aa" id="sec.107-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">This section does not apply to the giving of unsolicited advertising material for premises personally to a person at the premises.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a23ae1d9-e106-4f9a-a420-fe33231a721a" id="sec.107-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">To remove any doubt, it is declared that this section does not apply to the delivery to premises of a newspaper unless, having regard to <intref check="valid" refid="sec.106" target.guid="_db9110bc-ddb2-4afd-9b94-2008aaa5e9d1">section 106</intref><intref check="valid" refid="sec.106-ssec.2" target.guid="_b1addbd2-2a0a-40c2-b6e8-5912608085d8">(2)</intref>, the newspaper is unsolicited advertising material for the premises.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_afdf6b20-9947-4872-b5f3-4a2e3f0b7d14" id="sec.108" provision.type="other" spent.amends="0"><no>108</no><heading guid="_6f9639ef-598c-4b1f-8b2a-f5ba79cc94c4" id="sec.108-he">Secure delivery provision</heading><subclause affected.by.uncommenced="0" guid="_1f44f589-2565-4065-90ed-b587b01fba6c" id="sec.108-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person who delivers to premises any unsolicited advertising material for the premises must ensure that the material is placed securely—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b2a6677d-33e8-49cd-b318-824db4280033" id="sec.108-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in a receptacle, slot or other place used for the delivery of mail to the premises; or</txt></block></li><li guid="_498aaf2b-589e-4e6e-9025-5ed22bc59975" id="sec.108-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">in a receptacle or slot that is used for the delivery of newspapers to the premise; or</txt></block></li><li guid="_2fd90113-a428-4026-8b96-b52b96bbc7d8" id="sec.108-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">under a door of the premises.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9517577b-578b-45df-8f7f-fe4359a0a1a7" id="sec.108-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">To remove any doubt, it is declared that this section does not apply to the delivery to premises of a newspaper unless, having regard to <intref check="valid" refid="sec.106" target.guid="_db9110bc-ddb2-4afd-9b94-2008aaa5e9d1">section 106</intref><intref check="valid" refid="sec.106-ssec.2" target.guid="_b1addbd2-2a0a-40c2-b6e8-5912608085d8">(2)</intref>, the newspaper is unsolicited advertising material for the premises.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_5fc9936f-86fd-43f3-ae76-8cb76bb42ccf" id="sec.109" provision.type="other" spent.amends="0"><no>109</no><heading guid="_2bafd7e8-5dc2-40c9-bdc4-ba5c2403c638" id="sec.109-he">Placing document on or in motor vehicle or on building or other fixed structure</heading><subclause affected.by.uncommenced="0" guid="_8358d163-5502-45f2-ac34-0acee885ad5b" id="sec.109-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not place any document in or on a motor vehicle without the express consent of a person who is a registered operator, owner or driver of the vehicle.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7b56e555-6367-4d50-b30e-01357311af8d" id="sec.109-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A person must not attach any document to any building or other fixed structure without the express consent of the owner or occupier of the building or structure, or of a person acting for the owner or occupier.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_018311f6-aae2-49a0-a46e-8dcd681d834e" id="sec.109-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For <intref check="valid" refid="sec.109-ssec.1" target.guid="_8358d163-5502-45f2-ac34-0acee885ad5b">subsections (1)</intref> and <intref check="valid" refid="sec.109-ssec.2" target.guid="_7b56e555-6367-4d50-b30e-01357311af8d">(2)</intref>, it does not matter whether or not the document is advertising material.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4f5f3af2-ac5b-4c35-9ed2-0c3e9b1ed851" id="sec.109-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A person does not contravene <intref check="valid" refid="sec.109-ssec.1" target.guid="_8358d163-5502-45f2-ac34-0acee885ad5b">subsection (1)</intref> or <intref check="valid" refid="sec.109-ssec.2" target.guid="_7b56e555-6367-4d50-b30e-01357311af8d">(2)</intref> if the person places a document in or on a motor vehicle, or attaches a document to a building or other fixed structure—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a615efb2-b658-4d9c-8a3e-6bbe20b73709" id="sec.109-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in the lawful performance of a function under an Act; or</txt></block></li><li guid="_15453112-4b7c-4762-a370-4c4b58c2b4f8" id="sec.109-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the action is reasonable in the circumstances.</txt><note guid="_ad8ddf10-191c-4603-8179-b13e532069f4" id="sec.109-ssec.4-para1.b-note" type="example"><heading guid="_f36fe187-15c3-4882-8b8a-ccd66d12f740" id="sec.109-ssec.4-para1.b-note-he">Example of reasonable actions—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_7feab0bb-6c86-446f-af10-4c9a42842d81" id="sec.109-ssec.4-para1.b-note-para2" provision.type="other"><no>•</no><block><txt break.before="0">leaving a note on a motor vehicle providing contact details after causing accidental damage to the motor vehicle</txt></block></li><li guid="_9f18888a-7efa-4da7-8490-6fd133cb77e8" id="sec.109-ssec.4-para1.b-note-para2-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">leaving a note on a motor vehicle to indicate that the place where the motor vehicle is parked is reserved for other purposes</txt></block></li></list></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d2f0a6ec-a03d-48b5-8ed4-2bcff0fe1c6e" id="sec.109-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_c3ab6529-f45d-43c9-a69d-8c1a1841d54c" id="sec.109-ssec.5-def.document_"><txt break.before="1"><defterm guid="_51291603-dbbd-4758-9c8d-44a36ddf6cd2" id="sec.109-ssec.5-def.document" type="definition">document</defterm> means any paper or other material on which there is writing or any drawing, figure, symbol or other expression.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_508294e1-b1b7-43cb-91d1-1891c1bb6aa6" id="sec.110" provision.type="other" spent.amends="0"><no>110</no><heading guid="_c644e7ec-6059-4f71-b792-4cf2fd0c8904" id="sec.110-he">Advice to chief executive about placing or attaching documents</heading><subclause affected.by.uncommenced="0" guid="_82587d08-2485-46e8-8bbc-77f9d74175b9" id="sec.110-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the chief executive believes on reasonable grounds that documents have been distributed by being placed in or on motor vehicles, or attached to buildings or other fixed structures, in contravention of <intref check="valid" refid="sec.109" target.guid="_5fc9936f-86fd-43f3-ae76-8cb76bb42ccf">section 109</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_595b6f41-70b1-4c8d-a3a4-657ecd6ad375" id="sec.110-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may give a notice under this section to a person who is an adult if the chief executive reasonably believes the person—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8461a36e-ca4d-4413-9d93-76ccbaf84e0e" id="sec.110-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">authorised or arranged for the distribution of the documents; or</txt></block></li><li guid="_0271564d-d332-48d6-a18e-d837136e10dd" id="sec.110-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">authorised or arranged for printing of the documents; or</txt></block></li><li guid="_d57328ab-310f-4afb-89f9-2dea05d0df6c" id="sec.110-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">placed or attached any of the documents.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_55c0834c-20bf-4da3-9b3e-7bea5a7e2d27" id="sec.110-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A notice under <intref check="valid" refid="sec.110-ssec.2" target.guid="_595b6f41-70b1-4c8d-a3a4-657ecd6ad375">subsection (2)</intref><intref check="valid" refid="sec.110-ssec.2-para1.a" target.guid="_8461a36e-ca4d-4413-9d93-76ccbaf84e0e">(a)</intref> or <intref check="valid" refid="sec.110-ssec.2-para1.b" target.guid="_0271564d-d332-48d6-a18e-d837136e10dd">(b)</intref> may require the person to advise the chief executive of the name and contact details of any person who placed or attached 1 or more of the documents.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_31b802f3-ff04-4a09-baf6-4467a7f47b4a" id="sec.110-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A notice under <intref check="valid" refid="sec.110-ssec.2" target.guid="_595b6f41-70b1-4c8d-a3a4-657ecd6ad375">subsection (2)</intref><intref check="valid" refid="sec.110-ssec.2-para1.b" target.guid="_0271564d-d332-48d6-a18e-d837136e10dd">(b)</intref> or <intref check="valid" refid="sec.110-ssec.2-para1.c" target.guid="_d57328ab-310f-4afb-89f9-2dea05d0df6c">(c)</intref> may require the person to advise the chief executive of the name and contact details of the person who authorised or arranged for distribution of the documents.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_51845797-9283-492f-a1e8-b302bb898f8f" id="sec.110-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">A person who is given a notice under this section must comply with the notice within 7 days after receiving the notice unless the person has a reasonable excuse.</txt></block><penalty guid="_773a229d-8476-4958-8e4c-41f27b475914" id="sec.110-ssec.5-pen"><block><txt break.before="1">Maximum penalty—40 penalty units.</txt></block></penalty></subclause></clause><clause affected.by.uncommenced="0" guid="_fad37ef4-8503-4a0f-b1e7-542d00eea98d" id="sec.111" provision.type="other" spent.amends="0"><no>111</no><heading guid="_24d5a228-cd36-4358-8ea1-f76a44447629" id="sec.111-he">Advice to chief executive about delivering or distributing advertising material</heading><subclause affected.by.uncommenced="0" guid="_fb0c62e5-b5cc-4c89-88d4-ca5eeab91092" id="sec.111-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the chief executive believes on reasonable grounds that advertising material has been distributed in an area by being delivered to premises in contravention of the unlawful delivery provision or the secure delivery provision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b751551c-0c80-4c62-9936-6d4b292f60b3" id="sec.111-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may give a notice under this section to a person who is an adult if the chief executive reasonably believes the person—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4bbce29a-2940-49ce-9f32-0a2e0b06e20f" id="sec.111-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">authorised or arranged for the distribution of the advertising material; or</txt></block></li><li guid="_fcfe65a2-3663-463b-b687-781cd72a8b5c" id="sec.111-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">authorised or arranged for the printing of the advertising material; or</txt></block></li><li guid="_3357cb46-8e7f-4759-b453-1e6358b985ba" id="sec.111-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">delivered any of the advertising material.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_54fecfcf-f595-48c1-815a-cf9ba929799b" id="sec.111-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A notice under <intref check="valid" refid="sec.111-ssec.2" target.guid="_b751551c-0c80-4c62-9936-6d4b292f60b3">subsection (2)</intref><intref check="valid" refid="sec.111-ssec.2-para1.a" target.guid="_4bbce29a-2940-49ce-9f32-0a2e0b06e20f">(a)</intref> or <intref check="valid" refid="sec.111-ssec.2-para1.b" target.guid="_fcfe65a2-3663-463b-b687-781cd72a8b5c">(b)</intref> may require the person to advise the chief executive of the name and contact details of any person who delivered any of the advertising material.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c21438bb-bed3-4d75-9b1f-24559779ab78" id="sec.111-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A notice under <intref check="valid" refid="sec.111-ssec.2" target.guid="_b751551c-0c80-4c62-9936-6d4b292f60b3">subsection (2)</intref><intref check="valid" refid="sec.111-ssec.2-para1.b" target.guid="_fcfe65a2-3663-463b-b687-781cd72a8b5c">(b)</intref> or <intref check="valid" refid="sec.111-ssec.2-para1.c" target.guid="_3357cb46-8e7f-4759-b453-1e6358b985ba">(c)</intref> may require the person to advise the chief executive of the name and contact details of the person who authorised or arranged for distribution of the advertising material.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f91d7c3d-ccab-4594-a40c-938128b48f5f" id="sec.111-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">A person who is given a notice under this section must comply with the notice within 7 days after receiving the notice unless the person has a reasonable excuse.</txt></block><penalty guid="_0c96fdb9-acc1-4acd-8b2f-add481342bdb" id="sec.111-ssec.5-pen"><block><txt break.before="1">Maximum penalty—40 penalty units.</txt></block></penalty></subclause></clause><clause affected.by.uncommenced="0" guid="_d18a5e1e-6442-4800-97a4-2e85f6b14c40" id="sec.112" provision.type="other" spent.amends="0"><no>112</no><heading guid="_c0a9a866-6a39-4fcc-ad65-d44ef64bbe57" id="sec.112-he">Avoiding accumulations of waste</heading><subclause affected.by.uncommenced="0" guid="_fdd29875-40f3-4bb4-a6f9-00dbb1cf28c8" id="sec.112-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a person (the <defterm guid="_75a7dff4-255a-47e3-b9d6-77e09d483b08" id="sec.112-def.responsibleentity" type="definition">responsible entity</defterm>) authorises, or arranges for, the distribution of advertising material to premises in an area.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_07ba320b-8e88-48dd-bc93-aae7ad462729" id="sec.112-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The responsible entity must take reasonable steps to ensure that the advertising material does not, having regard to the way in which it is delivered to premises, become waste.</txt></block><penalty guid="_8454ff45-6c91-4bae-b3fe-0da86d8a9b27" id="sec.112-ssec.2-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty><note guid="_63c39d38-fa60-4be9-a18f-faf0523ffbe9" id="sec.112-ssec.2-note" type="example"><heading guid="_3034ee00-c972-4ada-ac3d-33246492c353" id="sec.112-ssec.2-note-he">Example of reasonable steps for <intref check="valid" refid="sec.112-ssec.2" target.guid="_07ba320b-8e88-48dd-bc93-aae7ad462729">subsection (2)</intref>—</heading><block><txt break.before="1">The advertising material is delivered in a way that is consistent with the Distribution Standards Board’s code of practice for the delivery of advertising material.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_ab3d20cd-dd07-4388-adb8-323534025e30" id="sec.112-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If, in the delivery of any of the advertising material to any premises, a person contravenes the unlawful delivery provision or the secure delivery provision, the responsible entity must, if directed by the chief executive to do so, collect the material from the premises within the period directed by the chief executive.</txt></block><penalty guid="_cc495659-b266-437e-b748-9b2b0b35c1bb" id="sec.112-ssec.3-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_78c1dce6-fa17-4c4d-bf61-68282fec29d0" id="sec.112-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">This section does not apply to a newspaper unless, having regard to <intref check="valid" refid="sec.106" target.guid="_db9110bc-ddb2-4afd-9b94-2008aaa5e9d1">section 106</intref><intref check="valid" refid="sec.106-ssec.2" target.guid="_b1addbd2-2a0a-40c2-b6e8-5912608085d8">(2)</intref>, the newspaper is unsolicited advertising material for premises.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_ae2ef4d5-f725-408b-80d9-bfe79aeee289" id="ch.5-pt.3"><no>Part 3</no><heading guid="_4c480a94-c4a0-47bb-bfb0-a2f0e6a3088e" id="ch.5-pt.3-he">Vehicle littering or illegal dumping offences</heading><division affected.by.uncommenced="0" guid="_5ec52b3e-d1ae-45f8-8f4d-95aaf49655db" id="ch.5-pt.3-div.1"><no>Division 1</no><heading guid="_bd55d7ee-8dc2-4e2b-b5f6-829e063dcfc7" id="ch.5-pt.3-div.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_00707985-7a98-4b42-8d4f-5f2168915625" id="sec.113" provision.type="other" spent.amends="0"><no>113</no><heading guid="_c446072d-746d-4d31-9bc5-75a11d65b03b" id="sec.113-he">Application of <intref check="valid" refid="ch.5-pt.3" target.guid="_ae2ef4d5-f725-408b-80d9-bfe79aeee289">pt 3</intref></heading><subclause affected.by.uncommenced="0" guid="_a97a3275-42a7-4532-ba93-4838615c4f3a" id="sec.113-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This part applies to an offence against a relevant offence provision if the offence is a vehicle littering or illegal dumping offence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c0feaaa7-043c-4308-8fd1-dd2c15118532" id="sec.113-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An offence against a relevant offence provision is a <defterm guid="_fbe4f0b7-07c6-44e3-a216-fe1a1ef324cd" id="sec.113-def.vehiclelitteringorillegaldumpingoffence" type="definition">vehicle littering or illegal dumping offence</defterm> if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_efab2430-af1f-415d-b4ad-c69bc4c411c2" id="sec.113-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the offence is committed by a person who is, or becomes, an occupant of a vehicle that is associated with the commission of the offence; and</txt></block></li><li guid="_412d0b3e-b3e8-4d80-8120-3077170a9ece" id="sec.113-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">under the <legref check="valid" jurisd="QLD" target.doc.id="act-1999-070" target.version.series="98b1c6c5-4112-4f50-bf2f-c03eb0a343e4" type="act"><name emphasis="yes">State Penalties Enforcement Act 1999</name></legref>, an offence against the relevant offence provision is prescribed to be an offence to which that Act applies.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_99b9dc18-d042-4d17-8499-e6d31efbec4b" id="sec.113-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A vehicle is associated with the commission of an offence against a relevant offence provision if, for example, the person who committed the offence—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_30771791-299b-4bf1-a2b6-8e91f47b7b94" id="sec.113-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">was in the vehicle when the offence was committed; or</txt></block></li><li guid="_ca4fc43e-f2fb-49ea-af14-32fbfa9008a8" id="sec.113-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">was leaving or had just left the vehicle when the offence was committed; or</txt></block></li><li guid="_c96b0505-5d81-4738-88bd-f837b9d9b785" id="sec.113-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">used the vehicle to transport waste to the place where the offence was committed; or</txt></block></li><li guid="_04e305ad-bf87-49fc-893c-0d9341b0cb5c" id="sec.113-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">committed the offence near the vehicle before entering the vehicle.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8ba1abe3-77e1-4f26-8b99-69ebb478f83c" id="sec.113-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Despite <intref check="valid" refid="sec.113-ssec.1" target.guid="_a97a3275-42a7-4532-ba93-4838615c4f3a">subsection (1)</intref>, this part does not apply to a vehicle littering or illegal dumping offence if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9649ac3d-3cf1-4e3a-a3f8-c6fb5eec6b16" id="sec.113-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the vehicle associated with the commission of the offence was a public passenger vehicle being used to transport members of the public; and</txt></block></li><li guid="_fb177b7a-b0a5-4e91-8417-43fb88898264" id="sec.113-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the offence was committed by a person other than the driver of the vehicle.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_dec44f9f-317e-4c8c-b8b5-a980fe5532d4" id="sec.113-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_18410f57-4ebe-42ad-ac5b-84b4d7cbdc73" id="sec.113-ssec.5-def.relevantoffenceprovision_"><txt break.before="1"><defterm guid="_ec2eac41-c573-471d-ab23-a19f58c4f4dd" id="sec.113-ssec.5-def.relevantoffenceprovision" type="definition">relevant offence provision</defterm> means the general littering provision or the illegal dumping of waste provision.</txt></definition></deflist></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_72676645-f3ce-4bfd-8256-c8b1d5f59d6c" id="ch.5-pt.3-div.2"><no>Division 2</no><heading guid="_963bd724-ecce-4397-a500-e28d353b2f23" id="ch.5-pt.3-div.2-he">Applying <legref check="valid" jurisd="QLD" target.doc.id="act-1999-070" target.version.series="98b1c6c5-4112-4f50-bf2f-c03eb0a343e4" type="act"><name emphasis="no">State Penalties Enforcement Act 1999</name></legref></heading><clause affected.by.uncommenced="0" guid="_4e6c7da7-decc-4fd0-aaed-ebbd783078df" id="sec.114" provision.type="other" spent.amends="0"><no>114</no><heading guid="_29425217-5ec9-4281-8d86-8397720261ae" id="sec.114-he">Application of <legref check="valid" jurisd="QLD" target.doc.id="act-1999-070" target.version.series="98b1c6c5-4112-4f50-bf2f-c03eb0a343e4" type="act"><name emphasis="no">State Penalties Enforcement Act 1999</name></legref></heading><subclause affected.by.uncommenced="0" guid="_64f475b8-e40b-4350-8427-e31622682df4" id="sec.114-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">For the <legref check="valid" jurisd="QLD" target.doc.id="act-1999-070" target.version.series="98b1c6c5-4112-4f50-bf2f-c03eb0a343e4" type="act"><name emphasis="yes">State Penalties Enforcement Act 1999</name></legref>, a vehicle littering or illegal dumping offence is an offence involving a vehicle as defined under that Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_622b8f66-6351-4a2d-ada2-cfa41d13496d" id="sec.114-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For applying the <legref check="valid" jurisd="QLD" target.doc.id="act-1999-070" target.version.series="98b1c6c5-4112-4f50-bf2f-c03eb0a343e4" type="act"><name emphasis="yes">State Penalties Enforcement Act 1999</name></legref> to a vehicle littering or illegal dumping offence, the references in <intref check="valid" refid="sec.17" target.guid="_3cf687e6-27d8-4f57-a73d-8c2ab5bc12ee">sections 17</intref><intref check="invalid" refid="sec.17-ssec.3">(3)</intref>, <intref check="valid" refid="sec.22" target.guid="_a46e1864-411e-4a17-a5f6-2641f308137e">22</intref><intref check="valid" refid="sec.22-ssec.1" target.guid="_3e4ccd87-4fcc-4e15-ab31-75e3f055eb30">(1)</intref><intref check="invalid" refid="sec.22-ssec.1-para1.c">(c)</intref>, <intref check="valid" refid="sec.33" target.guid="_3d2eff80-ce7b-478f-8c4f-756c2c82d619">33</intref><intref check="valid" refid="sec.33-ssec.1" target.guid="_68c31696-13d6-4341-9ae2-3b62b028a1cc">(1)</intref><intref check="invalid" refid="sec.33-ssec.1-para1.d">(d)</intref> and <intref check="valid" refid="sec.157" target.guid="_f6305182-ff36-4da1-aea9-2ac106058a9f">157</intref><intref check="valid" refid="sec.157-ssec.2" target.guid="_abba7954-a764-4f24-a396-bebe31044be9">(2)</intref><intref check="invalid" refid="sec.157-ssec.2-para1.j">(j)</intref> to an illegal user declaration, a known or unknown user declaration or a sold vehicle declaration are taken to include a reference to a passenger declaration.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_dfe49ac4-fd76-46f9-a81f-d118a9672943" id="sec.114-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0"><intref check="valid" refid="sec.114-ssec.2" target.guid="_622b8f66-6351-4a2d-ada2-cfa41d13496d">Subsection (2)</intref> does not affect a person’s right under the <legref check="valid" jurisd="QLD" target.doc.id="act-1999-070" target.version.series="98b1c6c5-4112-4f50-bf2f-c03eb0a343e4" type="act"><name emphasis="yes">State Penalties Enforcement Act 1999</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.17" target.doc.id="act-1999-070" target.guid="_ac3c2bdf-daa7-4689-bf2e-5ef0e34996c5" target.version.series="98b1c6c5-4112-4f50-bf2f-c03eb0a343e4" type="act">section 17</legref><legref check="unknown" jurisd="QLD" type="act">(3)</legref> to give a SPEA declaration for a vehicle for the offence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_72f7cd4a-a999-40cd-877f-29e1af125306" id="sec.114-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, if a person gives a passenger declaration for the offence, another person may not give a SPEA declaration or a passenger declaration for the same offence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c157d35e-7de6-46c3-b42f-af73a9bee722" id="sec.114-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_91ad69b5-b45d-4a47-95e3-dda1eb5bdef2" id="sec.114-ssec.5-def.SPEAdeclaration_"><txt break.before="1"><defterm guid="_d22d1a3d-5130-413e-8b2d-99d3bbb14364" id="sec.114-ssec.5-def.SPEAdeclaration" type="definition">SPEA declaration</defterm> means an illegal user declaration, a known or unknown user declaration or a sold vehicle declaration under the <legref check="valid" jurisd="QLD" target.doc.id="act-1999-070" target.version.series="98b1c6c5-4112-4f50-bf2f-c03eb0a343e4" type="act"><name emphasis="yes">State Penalties Enforcement Act 1999</name></legref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c3ded5f6-033c-4e19-874a-60fde9332ea4" id="sec.115" provision.type="other" spent.amends="0"><no>115</no><heading guid="_03824249-cd4e-4b1f-8d1e-4e61208b34c5" id="sec.115-he">Effect of passenger declaration</heading><subclause affected.by.uncommenced="0" guid="_feb76c8e-991d-4d1c-b277-bb7ccd26734b" id="sec.115-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_996bab43-5c3c-44d4-ac26-de074c196a09" id="sec.115-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a vehicle littering or illegal dumping offence happens; and</txt></block></li><li guid="_01b7f1fe-ff53-4547-a582-b72f2408cbe3" id="sec.115-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an infringement notice for the offence is served on a prescribed person for the offence; and</txt></block></li><li guid="_c889dda8-5249-4f93-8ae9-066b877f05fd" id="sec.115-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the prescribed person makes and gives to the administering authority for the infringement notice a passenger declaration for the offence.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_792503fe-6318-4a14-bad4-82c6c8782952" id="sec.115-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The <legref check="valid" jurisd="QLD" target.doc.id="act-1999-070" target.version.series="98b1c6c5-4112-4f50-bf2f-c03eb0a343e4" type="act"><name emphasis="yes">State Penalties Enforcement Act 1999</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.17" target.doc.id="act-1999-070" target.guid="_ac3c2bdf-daa7-4689-bf2e-5ef0e34996c5" target.version.series="98b1c6c5-4112-4f50-bf2f-c03eb0a343e4" type="act">section 17</legref> applies as if the person named in the declaration as the person who deposited the waste (the <defterm guid="_191d39f9-2be8-4349-8f07-217d94830361" id="sec.115-def.passenger" type="definition">passenger</defterm>) were the owner of the vehicle at the relevant time and date.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_261678c4-a1f3-4b9d-837a-41483fe8ecc7" id="sec.115-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A proceeding for the offence may be started against the passenger only if a copy of the declaration has been served on the passenger.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7bb7f6d8-f3b1-4470-a415-076fb8db5e84" id="sec.115-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In a proceeding for the offence against the passenger, the declaration is evidence that the passenger deposited the waste at the relevant time and date.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c6c4c30e-4444-4390-b1f2-fd58f8b30204" id="sec.115-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In a proceeding for the offence against the prescribed person, a court must not find the prescribed person guilty of the offence if it is satisfied, whether on the statements contained in the declaration or otherwise, the prescribed person did not deposit the waste at the relevant time and date.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5a721c56-cabf-4949-9250-651d947dbe97" id="sec.115-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_8acbd1ef-d1c5-476e-801d-25d2f99448d3" id="sec.115-ssec.6-def.administeringauthority_"><txt break.before="1"><defterm guid="_30457041-3120-4501-9dad-26dfc5d5dc99" id="sec.115-ssec.6-def.administeringauthority" type="definition">administering authority</defterm>, for the infringement notice, means the administering authority for the notice under the <legref check="valid" jurisd="QLD" target.doc.id="act-1999-070" target.version.series="98b1c6c5-4112-4f50-bf2f-c03eb0a343e4" type="act"><name emphasis="yes">State Penalties Enforcement Act 1999</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_7cf4d6ac-f413-40de-909a-52e68fe0987e" id="sec.115-ssec.6-def.relevanttimeanddate_"><txt break.before="1"><defterm guid="_1e3662d3-49a6-45cc-aded-b55fbaf879da" id="sec.115-ssec.6-def.relevanttimeanddate" type="definition">relevant time and date</defterm> means the time and date stated in the infringement notice as the time and date of the vehicle littering or illegal dumping offence.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_4fd63047-8c17-4aa1-8ae1-c6ec9a9e8b60" id="sec.116" provision.type="other" spent.amends="0"><no>116</no><heading guid="_4d2bd908-79c1-4672-a9e7-fb904ec09faa" id="sec.116-he">Service of infringement notice for vehicle littering or illegal dumping offence</heading><subclause affected.by.uncommenced="0" guid="_808b8da2-6a0e-479e-bc7d-d2f68aa34f9d" id="sec.116-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An infringement notice for a vehicle littering or illegal dumping offence may be served on the person named in a passenger declaration as the person who deposited the waste.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_85f933ef-bc92-4629-a618-b3e028a953f6" id="sec.116-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the infringement notice is to be served by post, the notice may be addressed to the person at the person’s address stated in the declaration.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_bc945494-b547-45a9-ba65-5ea417ea7dab" id="sec.117" provision.type="other" spent.amends="0"><no>117</no><heading guid="_a50a5011-77eb-4456-917b-d6797af2c6b9" id="sec.117-he">Chief executive (transport) must disclose information</heading><subclause affected.by.uncommenced="0" guid="_81638c3a-f9e5-4f97-bd3c-1ecc8b39fbea" id="sec.117-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7086e1ef-2be5-4ffa-ad5e-38fd5cc9152c" id="sec.117-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an authorised person is reasonably satisfied that vehicle registry information may be used—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fc828fae-3bfc-4335-9417-c55932f12e8c" id="sec.117-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">in a proceeding against a person for a vehicle littering or illegal dumping offence; or</txt></block></li><li guid="_97d4687a-1eb4-434a-9e9e-9c817df19621" id="sec.117-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">for the service of an infringement notice on a person for a vehicle littering or illegal dumping offence; and</txt></block></li></list></block></li><li guid="_b79b45a6-09b2-441d-8c6d-935a93b5cd40" id="sec.117-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the authorised person asks the chief executive (transport) for the information.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_abbd1488-f543-4e59-a842-0cda73d3cdbb" id="sec.117-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive (transport) must disclose the information to the authorised person if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7b70f048-5bb1-48c7-9986-96d465e206e2" id="sec.117-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the chief executive (transport) reasonably considers that the information may be used—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_96696b25-168f-4b6e-8057-831127082109" id="sec.117-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">in a proceeding against the person for the vehicle littering or illegal dumping offence; or</txt></block></li><li guid="_328eaa65-b843-4863-b374-ded16ff40f09" id="sec.117-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">for the service of an infringement notice on the person for the vehicle littering or illegal dumping offence; or</txt></block></li></list></block></li><li guid="_2167bf90-b1e6-46b3-80db-d51a9dd74758" id="sec.117-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the disclosure is authorised by the person to whom the information relates.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7d6e96e0-2bd0-4538-a324-565065675bfa" id="sec.117-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_5754dbe0-1054-485b-a713-e27ef00f8db2" id="sec.117-ssec.3-def.chiefexecutivetransport_"><txt break.before="1"><defterm guid="_a7265feb-f9f7-4c46-9a97-fea4520df1b8" id="sec.117-ssec.3-def.chiefexecutivetransport" type="definition">chief executive (transport)</defterm> means the chief executive of the department in which the <legref check="valid" jurisd="QLD" target.doc.id="act-1995-009" target.version.series="9b6b47f6-005d-47e6-afd5-1c5039eda4c6" type="act"><name emphasis="yes">Transport Operations (Road Use Management) Act 1995</name></legref> is administered.</txt></definition><definition affected.by.uncommenced="0" guid="_78148349-30bd-49ab-bf6b-65a00f6bb1f6" id="sec.117-ssec.3-def.vehicleregistryinformation_"><txt break.before="1"><defterm guid="_60a7e12d-eaf4-489b-ac30-1a15c9efc6b8" id="sec.117-ssec.3-def.vehicleregistryinformation" type="definition">vehicle registry information</defterm> means information kept in the register of registered vehicles under a regulation under the <legref check="valid" jurisd="QLD" target.doc.id="act-1995-009" target.version.series="9b6b47f6-005d-47e6-afd5-1c5039eda4c6" type="act"><name emphasis="yes">Transport Operations (Road Use Management) Act 1995</name></legref>.</txt></definition></deflist></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_41d2e4fd-42a0-468c-a08d-3fe75b9e001d" id="ch.5-pt.3-div.3"><no>Division 3</no><heading guid="_e0aa4013-e048-4d25-93fa-b9510f937ff7" id="ch.5-pt.3-div.3-he">Public reporting of vehicle littering or illegal dumping offences</heading><clause affected.by.uncommenced="0" guid="_ab59211b-3700-49b6-865a-1cca9af59b67" id="sec.118" provision.type="other" spent.amends="0"><no>118</no><heading guid="_eb2f79fd-98eb-47f6-9ae3-d5f4e9c111a4" id="sec.118-he">Facilitating enforcement of vehicle littering or illegal dumping offence</heading><subclause affected.by.uncommenced="0" guid="_4f506499-1a1c-4481-b76b-20629fc653ce" id="sec.118-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a person (the <defterm guid="_bb422b22-d27f-49ef-ab6f-bfef2695023d" id="sec.118-def.reporter" type="definition">reporter</defterm>) observes an incident that the reporter considers to be the commission of a vehicle littering or illegal dumping offence, the reporter may give the chief executive a signed notice (a <defterm guid="_497d4571-69e5-4108-811e-715ae1e68b22" id="sec.118-def.vehiclelitteringorillegaldumpingreport" type="definition">vehicle littering or illegal dumping report</defterm>) containing information about the incident.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_90cd4142-a9a6-48a5-b78c-70f98f97edcd" id="sec.118-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive must maintain arrangements for receiving and giving consideration to any vehicle littering or illegal dumping report, whether the report is given in hard copy or electronic form.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1d4c4cf6-20cf-4f69-af19-88de832e1237" id="sec.118-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive must not, other than with the consent of the reporter, or to take action under this chapter, including starting a proceeding, release to any person a vehicle littering or illegal dumping report.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3b8d397c-b52c-4a6e-83d6-918486108db1" id="sec.118-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A vehicle littering or illegal dumping report should, if practicable, include enough information about the incident to allow the chief executive to form an opinion about whether a vehicle littering or illegal dumping offence has happened, and if so, the circumstances of the offence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ef2aad03-b801-4762-bad9-b9db485a59eb" id="sec.118-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.118-ssec.4" target.guid="_3b8d397c-b52c-4a6e-83d6-918486108db1">subsection (4)</intref>, the information may include the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7f73ade2-55e6-4183-9a2e-b77fe64221cd" id="sec.118-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the reporter’s name, street address and contact details;</txt></block></li><li guid="_3373578c-fb61-4fbb-b1e6-6cc364305f5c" id="sec.118-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the date, the approximate time and the place of the incident;</txt></block></li><li guid="_f7c18848-c01b-4df2-b88c-3e241a938194" id="sec.118-ssec.5-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">registration details of the vehicle involved;</txt></block></li><li guid="_aa3159b5-d784-4153-b1e1-ee4dd55052a4" id="sec.118-ssec.5-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the make, model, body type and colour of the vehicle involved;</txt></block></li><li guid="_be652a9e-944b-49e3-a425-4691a8c5eef4" id="sec.118-ssec.5-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the type and amount of waste deposited;</txt></block></li><li guid="_9d6ed78f-a1c5-42b3-9a85-e22d68810d00" id="sec.118-ssec.5-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">any other details that may in the circumstances help the chief executive;</txt><note guid="_515d0bbe-0c25-4d7a-b378-ae476ab76017" id="sec.118-ssec.5-para1.f-note" type="example"><heading guid="_ee6b2e1c-dfce-490a-bc4a-23af4690afab" id="sec.118-ssec.5-para1.f-note-he">Example—</heading><block><txt break.before="1">the side of the vehicle from which waste was thrown</txt></block></note></block></li><li guid="_c6a04b7a-c9da-40fc-941d-50021cd43a93" id="sec.118-ssec.5-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">whether the reporter is prepared to give evidence about the incident in a court if asked to do so.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_288967e7-a2d2-45ca-8b9d-1c81bf0fc33d" id="sec.118-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">Without limiting the factors the chief executive may take into consideration in deciding whether to take any action in relation to a vehicle littering or illegal dumping report, the factors may include the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0c3542dd-bdbe-46d1-a5c6-ae3631e1a80f" id="sec.118-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">whether the reporter can be identified;</txt></block></li><li guid="_3db662cf-ddeb-4fb6-8026-de5d9f923889" id="sec.118-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether there is enough detail in the report to allow the chief executive to form an opinion about whether a vehicle littering or illegal dumping offence has happened;</txt></block></li><li guid="_24b53240-fbfc-4676-ae76-b8d91ea01eca" id="sec.118-ssec.6-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">whether the reporter has been identified, having regard to previous vehicle littering or illegal dumping reports or other previous correspondence, as a person who has given information that is vexatious or mischievous in nature;</txt></block></li><li guid="_0f4a4e3b-de39-45f2-89d7-f9a3efacf5e2" id="sec.118-ssec.6-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">whether the reporter is prepared to give evidence in court about the circumstances of the vehicle littering or illegal dumping offence;</txt></block></li><li guid="_7fc02a2b-2ce5-4ed6-8203-32b41c92c8d2" id="sec.118-ssec.6-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">whether the vehicle reported on is a vehicle to which this part applies.</txt></block></li></list></block></subclause></clause></division></part></chapter><chapter affected.by.uncommenced="0" guid="_787687db-62d2-4aa2-9846-8af52d770496" id="ch.6"><no>Chapter 6</no><heading guid="_ad9e99c6-7790-4779-b6a2-5f8f9892e600" id="ch.6-he">Strategic planning for waste reduction and recycling</heading><part affected.by.uncommenced="0" guid="_de36127a-7ea6-405c-80bc-20f5f353a744" id="ch.6-pt.1"><no>Part 1</no><heading guid="_a0c4d87a-619b-4310-9518-9199652812e9" id="ch.6-pt.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_c65c5280-9f33-4cca-9ce8-d0884c9afc2f" id="sec.119" provision.type="other" spent.amends="0"><no>119</no><heading guid="_b67f7712-af3a-4ee8-8e28-dc2762b4cdef" id="sec.119-he">Purpose of chapter</heading><block><txt break.before="1">The purpose of this chapter is to provide, in a way that achieves the objects of this Act, for strategic planning for improving waste management—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_aadfe9fc-b131-41d9-a775-05ddd3204f55" id="sec.119-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">at regional and individual local government level; and</txt></block></li><li guid="_aae5acb5-0d17-468f-bdb1-a34e06705e3f" id="sec.119-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">at state government departmental level; and</txt></block></li><li guid="_8f7c0946-3ab1-4c52-9b53-ac5a812c0450" id="sec.119-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">at business and industry level.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_3037e148-d90d-4bf4-90cf-635c926cf2d0" id="sec.120" provision.type="other" spent.amends="0"><no>120</no><heading guid="_4ef40d0c-b834-4f8a-ac84-08f1fc3eafe6" id="sec.120-he">Meaning of <defterm guid="_9c989012-ba6d-4ed7-ba64-e3b078e1dbc6" type="mention">waste reduction and recycling plan</defterm></heading><block><deflist><block><txt break.before="1">A <defterm guid="_e47240d4-578b-4a7d-b958-536ed4ea1859" id="def.wastereductionandrecyclingplan" type="definition">waste reduction and recycling plan</defterm>, for an entity, is a plan that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f7984546-fa53-4b5d-8e32-00091f151bec" id="sec.120-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">establishes strategic waste management, including waste reduction and recycling, planning requirements for the entity for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b69d4766-34e1-469b-adf3-b01dc9089c12" id="sec.120-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a particular aspect of waste management relevant to the entity; or</txt></block></li><li guid="_6226e749-af94-4e57-8e9c-1cc91280354d" id="sec.120-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">some or all aspects of waste management relevant to the entity; and</txt></block></li></list></block></li><li guid="_2c573955-ba01-48aa-9a54-b43d198f5785" id="sec.120-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">has been prepared and adopted in compliance with the requirements of this chapter.</txt></block></li></list></block></deflist></block></clause></part><part affected.by.uncommenced="0" guid="_ec0692bd-9146-436b-9390-9e3001a493bc" id="ch.6-pt.2"><no>Part 2</no><heading guid="_8cd5cda4-e0f5-49a5-be6c-6d3fecae06b4" id="ch.6-pt.2-he">Local government strategic planning for waste</heading><division affected.by.uncommenced="0" guid="_8898f829-f596-417b-9ed3-dab4c12c9697" id="ch.6-pt.2-div.1"><no>Division 1</no><heading guid="_d1bb1c0e-a339-499f-a08d-21ddb1a4a5fa" id="ch.6-pt.2-div.1-he">Introduction</heading><clause affected.by.uncommenced="0" guid="_682fcd88-6146-453e-8f5a-58b1775a19a5" id="sec.121" provision.type="other" spent.amends="0"><no>121</no><heading guid="_36b2cbab-ae52-4942-9258-44a57ee99f0f" id="sec.121-he">Object of <intref check="valid" refid="ch.6-pt.2" target.guid="_ec0692bd-9146-436b-9390-9e3001a493bc">pt 2</intref></heading><block><txt break.before="1">The object of this part is to provide for each local government to prepare, adopt and implement a plan for managing waste, in its local government area, in a way that best achieves the objects of this Act.</txt></block></clause><clause affected.by.uncommenced="0" guid="_2c2f0011-d7c6-40df-9f46-8397e368e09b" id="sec.122" provision.type="other" spent.amends="0"><no>122</no><heading guid="_4a6cb6e4-b6a2-407d-8cd7-7fdb6285a3c1" id="sec.122-he">Local governments combining on a regional basis</heading><block><txt break.before="1">If 2 or more local governments combine as a single entity to prepare a waste reduction and recycling plan for an aspect of waste management, the plan must satisfy the requirements for waste reduction and recycling plans for that aspect of waste management for all the local governments.</txt></block></clause></division><division affected.by.uncommenced="0" guid="_09659470-1846-4ccf-8c67-78597e8016c9" id="ch.6-pt.2-div.2"><no>Division 2</no><heading guid="_b082f4af-9c67-4e93-9d8e-327ed88a2950" id="ch.6-pt.2-div.2-he">Obligation of local government for waste reduction and recycling plans</heading><clause affected.by.uncommenced="0" guid="_773ad283-3636-4011-aff1-9e8d7e9911e5" id="sec.123" provision.type="other" spent.amends="0"><no>123</no><heading guid="_8155797f-0fca-459c-973f-ad8dab30e033" id="sec.123-he">Local government’s waste reduction and recycling plan obligation</heading><subclause affected.by.uncommenced="0" guid="_ec7cb2d4-826e-493b-b5ff-35e81134d30b" id="sec.123-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">On and from the day prescribed under a regulation, a local government has an obligation at all times to ensure that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d077ea64-55af-4967-b5cc-061b79e67fd9" id="sec.123-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">all aspects of waste management in its local government area are comprehensively addressed by 1 or more waste reduction and recycling plans; and</txt></block></li><li guid="_ac1104bc-1942-4847-8d3f-4bf7577909c1" id="sec.123-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">each waste reduction and recycling plan has been prepared by the local government or with its approval, and has been adopted by the local government; and</txt></block></li><li guid="_dc954ea6-f610-4bb8-bcaa-525370ca8ffe" id="sec.123-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">each waste reduction and recycling plan is being implemented in accordance with its terms.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6279718a-4391-4832-9786-82959284d948" id="sec.123-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.123-ssec.1" target.guid="_ec7cb2d4-826e-493b-b5ff-35e81134d30b">subsection (1)</intref>, the local government’s waste reduction and recycling plans must, to the extent reasonably practicable, include the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_912f7fe4-0b0c-441c-9761-b47ba8b39754" id="sec.123-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">waste reduction and recycling targets for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_43e8e92b-d553-4c6b-be3c-40dda2dec673" id="sec.123-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">waste generated by the local government in carrying out its activities; and</txt></block></li><li guid="_7d8a6548-3316-4f5d-bda7-ac7de298adb4" id="sec.123-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">waste generated by households in the local government’s local government area; and</txt></block></li><li guid="_97b9894b-b8ba-42f8-b8ed-6ad22a675ebd" id="sec.123-ssec.2-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">other waste generated in the local government’s local government area other than by the local government;</txt></block></li></list></block></li><li guid="_348f323f-99b9-4f13-85f4-fe0527d71ff4" id="sec.123-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">actions to be taken to improve waste reduction and recycling of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7557743f-bdd8-4aeb-a7cc-b962712ab8c0" id="sec.123-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">waste generated by the local government in carrying out its activities; and</txt></block></li><li guid="_946b9295-17b0-4db1-a77e-248ba87adb28" id="sec.123-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">waste generated by households in the local government’s local government area; and</txt></block></li><li guid="_91753337-83ea-40d6-b0e7-55f99cc32133" id="sec.123-ssec.2-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">other waste generated in the local government’s local government area other than by the local government;</txt></block></li></list></block></li><li guid="_822b0da6-6ad7-40af-bd52-ce60c701b0b3" id="sec.123-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">details of current and proposed waste infrastructure;</txt></block></li><li guid="_ef743f1c-d7a0-466a-8f1d-ea5d4ed0d7e3" id="sec.123-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the management and monitoring of the local government’s performance under the plans;</txt></block></li><li guid="_884d82cd-c42a-4b9d-ae9b-aa90c27ef127" id="sec.123-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">information about achieving continuous improvement in waste management;</txt></block></li><li guid="_bb8af94d-d69c-4636-894b-21bcb9c87d97" id="sec.123-ssec.2-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">other matters prescribed under a regulation about the requirements for a local government’s waste reduction and recycling plans.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a91a9e49-bb85-43f2-bedd-916c2e4083f7" id="sec.124" provision.type="other" spent.amends="0"><no>124</no><heading guid="_84e7ab56-2e2c-4fd5-b95b-79922b83c04c" id="sec.124-he">Matters to be complied with in the preparation and adoption of a local government’s waste reduction and recycling plan</heading><subclause affected.by.uncommenced="0" guid="_bec76dfb-3636-4b2b-8328-b0185d6c02b7" id="sec.124-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A local government, in preparing or adopting a waste reduction and recycling plan for its local government area, must have regard to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8659e23f-d920-49bf-833b-29ee442cf2e6" id="sec.124-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">current and predicted information about the following matters relating to its area—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5be7575e-4e62-46db-aa53-70f527e8a4f3" id="sec.124-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">population profiles;</txt></block></li><li guid="_8e20444c-9135-490d-8553-495d3a6b1b91" id="sec.124-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">residential, industrial and commercial development;</txt></block></li><li guid="_da704911-054c-4cfc-ba4e-f47ef2867034" id="sec.124-ssec.1-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">amounts and types of waste generated; and</txt></block></li></list></block></li><li guid="_f7d7bc70-10fe-4a05-b348-47b718f66abc" id="sec.124-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the services, markets and facilities relevant to dealing with different types and amounts of waste; and</txt></block></li><li guid="_108d4215-82eb-4aaa-bdea-a0e30971269d" id="sec.124-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the waste and resource management hierarchy; and</txt></block></li><li guid="_7efdbd89-7f4b-4198-b33f-61c488ff3968" id="sec.124-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the waste and resource management principles; and</txt></block></li><li guid="_8835995f-b365-4e16-88ff-fd874721f0f9" id="sec.124-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">how the goals and targets of the State’s waste management strategy will be achieved.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0e332468-b3cd-4d25-a514-d82924b9d906" id="sec.124-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.124-ssec.1" target.guid="_bec76dfb-3636-4b2b-8328-b0185d6c02b7">Subsection (1)</intref> does not limit the matters the local government may or ought to have regard to.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5bdfa12a-f86f-4cbd-a592-e4b418919b6f" id="sec.124-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A waste reduction and recycling plan for a local government must provide for the plan to be in effect for a period (the <defterm guid="_ee43bc8e-7fab-4e11-beda-fe5035ccceb4" id="sec.124-def.implementationperiod" type="definition">implementation period</defterm> for the plan) of at least 3 years.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_40696ffc-c492-4c53-832a-4e120f8ffdbb" id="sec.124-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0"><intref check="valid" refid="sec.124-ssec.3" target.guid="_5bdfa12a-f86f-4cbd-a592-e4b418919b6f">Subsection (3)</intref> does not stop a waste reduction and recycling plan being amended or replaced within the implementation period for the plan.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2b0e1ec5-2c5a-4385-ae2c-5c49ccb7f8a7" id="sec.125" provision.type="other" spent.amends="0"><no>125</no><heading guid="_b40eeb04-29b2-440b-853a-2e6145ef815d" id="sec.125-he">Adoption of plan following consultation</heading><subclause affected.by.uncommenced="0" guid="_2acf22a0-e5a7-4fa1-a843-4750a72af602" id="sec.125-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A local government must by resolution adopt a waste reduction and recycling plan, or an amendment of a waste reduction and recycling plan, before the plan or amendment is implemented in its local government area.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_60811201-6928-4635-b0f6-cd5391e5f5a7" id="sec.125-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Before adopting the plan or amendment, the local government must consult with the public about the proposed plan or amendment.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bfa2f6ea-414f-48d5-aea6-fc68ae829662" id="sec.125-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The level of consultation must be appropriate in the circumstances, having regard to the level of significance of the plan or amendment.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a4964c87-b0c7-456a-ab11-c12d00b43c5d" id="sec.125-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, if a new waste reduction and recycling plan is proposed to be adopted, or a proposed amendment of a waste reduction and recycling plan will substantially affect the operation of the plan, the proposed plan or amendment must be made available for public comment, including especially by households and businesses, for at least 28 days.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1c3882ef-46e4-488c-96df-50385893941f" id="sec.125-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The local government must, in finalising a plan or amendment for adoption, take into account any submissions received about the plan or amendment.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_cbdedb93-4cd2-441d-9eb4-a8466f1e8e56" id="sec.126" provision.type="other" spent.amends="0"><no>126</no><heading guid="_bf9e1cc2-54fe-4e0e-af34-368585b41acf" id="sec.126-he">Review of plan</heading><block><txt break.before="1">A local government must, at least every 3 years, review each waste reduction and recycling plan having effect in its local government area.</txt></block></clause><clause affected.by.uncommenced="0" guid="_871b278a-728f-409e-a441-f7be3e12613d" id="sec.127" provision.type="other" spent.amends="0"><no>127</no><heading guid="_653bb24a-8c7e-44f6-9f69-c697f925c0bb" id="sec.127-he">Amendment of plan</heading><subclause affected.by.uncommenced="0" guid="_40b096e5-c597-4088-af1f-e69d8ac825b9" id="sec.127-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A local government may adopt an amendment of a waste reduction and recycling plan having effect in its local government area if it considers the amendment to be appropriate, having regard to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3b62616c-1174-4094-96bd-3c67ebe51ddd" id="sec.127-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">changing waste reduction and recycling opportunities; and</txt></block></li><li guid="_6e6cb9d0-92b1-446d-9f5c-76ae3afb9752" id="sec.127-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">changing circumstances in which the plan operates; and</txt></block></li><li guid="_92b409b3-1c3a-47c9-9dde-3f7b06776e5f" id="sec.127-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">other matters arising from a review of the plan as required under this part; and</txt></block></li><li guid="_c4f0f3a2-f7ab-4441-82a5-b696dfaea80f" id="sec.127-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">anything else the local government considers relevant.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_02131abe-6ad0-45b1-8116-e42b28408026" id="sec.127-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A local government may not adopt an amendment of a waste reduction and recycling plan having effect in 2 or more local government areas unless all the local governments adopt the amendment.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_6bcd3f02-ac09-4dce-bf0e-2dea1cd3325a" id="ch.6-pt.2-div.3"><no>Division 3</no><heading guid="_782989d3-6608-4275-beae-af39d0b98ca6" id="ch.6-pt.2-div.3-he">Chief executive action to prepare waste reduction and recycling plan for local government</heading><clause affected.by.uncommenced="0" guid="_f859d98d-a743-49c3-81f3-206879a27cbc" id="sec.128" provision.type="other" spent.amends="0"><no>128</no><heading guid="_6e92ab1d-9674-45ee-8e24-76e0aa05feae" id="sec.128-he">Chief executive may prepare waste reduction and recycling plan</heading><subclause affected.by.uncommenced="0" guid="_a4543fa3-4dcb-4ace-82d3-818fec4e079f" id="sec.128-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, in contravention of a local government’s waste reduction and recycling plan obligation, the local government does not have in place a waste reduction and recycling plan addressing an aspect of waste reduction and recycling relevant to the local government.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9dded3e5-5911-4906-86a6-9623cb7394f4" id="sec.128-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may prepare a waste reduction and recycling plan for the local government to address the aspect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_79434617-29db-4e8a-ab51-b0e5d0a9fd06" id="sec.128-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Before preparing the plan, the chief executive must give notice to the local government stating the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5032af7b-aa2d-478b-abf4-052b47e1c3f2" id="sec.128-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the chief executive’s intention to prepare the plan;</txt></block></li><li guid="_b37206d3-b6df-4cb8-94a7-9b5a4cd632e4" id="sec.128-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the reasons why it is necessary for the plan to be prepared;</txt></block></li><li guid="_8cf1e45f-8c03-4b02-a57e-59764a64dfa0" id="sec.128-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that the local government may make a written submission to the chief executive about the chief executive’s intention to prepare the plan;</txt></block></li><li guid="_9b22ed5b-2d83-4d6a-8d21-1183fddae98d" id="sec.128-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">that the submission must be received by the chief executive within 28 days after the local government receives the notice (the <defterm guid="_a7499570-0e77-48f2-bb9e-0509074c6efe" id="sec.128-ssec.3-def.submissionperiod" type="definition">submission period</defterm>).</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e58bd8ad-a4b9-4ee6-bc3e-3b07db9571e6" id="sec.128-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The local government’s written submission may include details of actions the local government intends to take to ensure it complies with its waste reduction and recycling plan obligation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_21b94721-ae5e-4970-8bd8-f8ad5a9f629f" id="sec.128-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If after the submission period ends, and the consideration of any submissions, the chief executive still proposes to prepare the plan, the chief executive must give the local government an information notice for the chief executive’s decision to prepare the plan.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9d7014b4-88b3-49ea-b7d7-c3f6048ea712" id="sec.128-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The chief executive must prepare and adopt the plan, to the greatest practicable extent, as if it were the local government.</txt><note guid="_d5a55b7d-2ec0-47fd-a824-a954ea9d5796" id="sec.128-ssec.6-note" type="example"><heading guid="_c36801d0-cd81-4282-a9ca-77d05b9564ff" id="sec.128-ssec.6-note-he">Example—</heading><block><txt break.before="1">The chief executive must consult on, and publicise, the plan to the same extent the local government would have been required to consult and publicise.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_65667973-f55a-4ca8-b62b-5f960e7b9e0b" id="sec.128-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">The plan, as prepared and adopted by the chief executive, has effect as, and may be taken to be, a waste reduction and recycling plan prepared and adopted by the local government, and must be implemented by the local government in accordance with its terms.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_70d0d949-0506-4329-9c02-337cf643a454" id="sec.128-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">The local government must reimburse the chief executive for all costs, charges and expenses reasonably incurred by the chief executive in acting under this section.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_59e151fb-0f1a-47af-8deb-eb398feb46a5" id="sec.128-ssec.9" provision.type="other"><no>(9)</no><block><txt break.before="0">An amount owing under <intref check="valid" refid="sec.128-ssec.8" target.guid="_70d0d949-0506-4329-9c02-337cf643a454">subsection (8)</intref> may be recovered by the chief executive from the local government as a debt payable by the local government to the State, and may at the chief executive’s discretion be retained from any amount otherwise payable by the State to the local government for any reason.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_80c45eb2-dd24-43e0-a8d3-13e2ec2dff9c" id="ch.6-pt.2-div.4"><no>Division 4</no><heading guid="_85b8a421-f1ac-4ee2-8dee-768c8c46ac9c" id="ch.6-pt.2-div.4-he">Requirements applying after adoption of waste reduction and recycling plan</heading><clause affected.by.uncommenced="0" guid="_b4f94d12-0534-47cb-9aaa-8f64745834e7" id="sec.130" provision.type="other" spent.amends="0"><no>130</no><heading guid="_1805a780-4a30-448b-ba1d-32fd854f9e36" id="sec.130-he">Inspection and availability for purchase of plan</heading><subclause affected.by.uncommenced="0" guid="_a51be860-926e-4e1d-8ee2-38f30b89cf7c" id="sec.130-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A local government must ensure that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_81d39784-449d-4e71-9f0f-7bc2e4a18d07" id="sec.130-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an up-to-date version of each waste reduction and recycling plan having effect in its local government area may be inspected free of charge during office hours at the local government’s public office; and</txt></block></li><li guid="_8ae2439f-e167-4c5e-a55f-b5d4df0e30d6" id="sec.130-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a copy of the version may be obtained from the local government for no cost, or for a reasonable fee as decided by the local government; and</txt></block></li><li guid="_70343c3f-3daa-4bbd-86ee-5873678c7502" id="sec.130-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the plan is otherwise made publicly available in a way the local government considers appropriate for its local government area.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a776ec86-6e0b-4054-b98f-d7ad828a0cfc" id="sec.130-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, for a waste reduction and recycling plan adopted by 2 or more local governments, the local government must not charge a fee under <intref check="valid" refid="sec.130-ssec.1" target.guid="_a51be860-926e-4e1d-8ee2-38f30b89cf7c">subsection (1)</intref><intref check="valid" refid="sec.130-ssec.1-para1.b" target.guid="_8ae2439f-e167-4c5e-a55f-b5d4df0e30d6">(b)</intref> unless the same fee is charged by all the local governments that adopted the plan.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_14534ff4-6388-4e30-9b66-0658b6026d44" id="ch.6-pt.3"><no>Part 3</no><heading guid="_4f9db616-b571-47eb-ad25-71fb7f220dac" id="ch.6-pt.3-he">State entity strategic planning for waste</heading><division affected.by.uncommenced="0" guid="_210049ea-5e34-4a84-bf53-ea661ed1295c" id="ch.6-pt.3-div.1"><no>Division 1</no><heading guid="_d7b6d6aa-46d9-4334-b914-571dfd3ce579" id="ch.6-pt.3-div.1-he">Introduction</heading><clause affected.by.uncommenced="0" guid="_e8eea52a-b016-4eb8-8bf7-8a013b4d3840" id="sec.131" provision.type="other" spent.amends="0"><no>131</no><heading guid="_92dfaeea-33eb-4e0c-b36f-0b58e4fcf324" id="sec.131-he">Object of <intref check="valid" refid="ch.6-pt.3" target.guid="_14534ff4-6388-4e30-9b66-0658b6026d44">pt 3</intref></heading><block><txt break.before="1">The object of this part is to provide for the chief executive officer of each State entity to prepare, adopt and implement a plan for managing the entity’s waste in a way that best achieves the objects of this Act.</txt></block></clause><clause affected.by.uncommenced="0" guid="_47792c0f-8d54-463b-8577-64c4fafdf3a6" id="sec.132" provision.type="other" spent.amends="0"><no>132</no><heading guid="_2d256d29-e596-496d-9024-e452ca5da88a" id="sec.132-he">What is a State entity and who is its chief executive officer</heading><subclause affected.by.uncommenced="0" guid="_cc2ba21a-98b5-4b57-94ed-1181907a390b" id="sec.132-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Each of the following is a <defterm guid="_750998da-f7f9-4d93-95de-3697f9c077c1" id="sec.132-def.Stateentity" type="definition">State entity</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4e41e99b-3657-40f3-9388-84ccc0381e4b" id="sec.132-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a department;</txt></block></li><li guid="_b04c7c1f-36c1-48b4-9965-eb7bc758f408" id="sec.132-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an entity that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b0d2d089-ed6e-4cbc-b09b-b724b436a12c" id="sec.132-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">under the <del xml:space="preserve"><legref check="valid" jurisd="QLD" target.doc.id="act-2008-038" target.version.series="fb2a64ab-e90e-42c2-83db-24a42b4ba0d3" type="act"><name emphasis="yes">Public Service Act 2008</name></legref></del><ins xml:space="preserve"><legref check="unknown" jurisd="QLD" type="act"><name emphasis="yes">Public Sector Act 2022</name></legref>, section 276</ins>, is a government entity but is not a government owned corporation; and</txt><note guid="_d754f91b-ddb7-409f-aefd-b4780813ffe5" id="sec.132-ssec.1-para1.b-para2.i-note" type="example"><heading change="ins" guid="_44ae5819-d07e-4697-9ecd-7c3ed2eeba9c" id="sec.132-ssec.1-para1.b-para2.i-note-he">Editor’s note—</heading><block><txt break.before="1"><ins xml:space="preserve">Section 132(1)(b)(i) incorporates an uncommenced amendment—see 2022 Act No. 34 s 365 sch 3.</ins></txt></block></note></block></li><li guid="_090d89dc-edd5-40ea-a228-d8cde3254cab" id="sec.132-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">is prescribed under a regulation to be a State entity for this Act.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c7d59a34-963e-4b2a-9856-02fa6692b571" id="sec.132-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The <defterm guid="_a48e70a3-1fab-4978-9a12-e3964528b167" id="sec.132-def.chiefexecutiveofficer" type="definition">chief executive officer</defterm> of a State entity is the person who is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b6b34aeb-53a5-4ae5-bcbc-64ef10a40f00" id="sec.132-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the entity is a department—the chief executive of the department; or</txt></block></li><li guid="_a3415517-a212-44c2-88f4-73bcb8e15f1c" id="sec.132-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—the person who is the chief executive officer of the entity, by whatever name known.</txt></block></li></list></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_2da029d9-226a-47ca-b406-b1aa8d7df805" id="ch.6-pt.3-div.2"><no>Division 2</no><heading guid="_6034e73d-112f-42e6-9151-a20c6c2d5c47" id="ch.6-pt.3-div.2-he">Obligation of chief executive officer of State entity for waste reduction and recycling plan</heading><clause affected.by.uncommenced="0" guid="_15f0367f-8266-4147-8ff5-f5de578ccc5c" id="sec.133" provision.type="other" spent.amends="0"><no>133</no><heading guid="_8b4ebb2a-339b-43a5-8906-32d7c374da86" id="sec.133-he">State entity’s waste reduction and recycling plan obligation</heading><subclause affected.by.uncommenced="0" guid="_e8eb4a53-59bf-43c0-8248-0ebb34720451" id="sec.133-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">On and from the day prescribed under a regulation, the chief executive officer of a State entity has an obligation at all times to ensure that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_640113ff-078d-4bb6-9f8e-d894f39f0494" id="sec.133-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">all aspects of waste management for the entity are comprehensively addressed by a waste reduction and recycling plan for the entity; and</txt></block></li><li guid="_36464c7c-f4f2-4c34-bf10-6c7961aaa3e8" id="sec.133-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the waste reduction and recycling plan has been adopted by the chief executive officer; and</txt></block></li><li guid="_69268397-4fd8-4b65-a2d8-65a6e48abf61" id="sec.133-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the waste reduction and recycling plan is being implemented in accordance with its terms.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9c6a6bfc-b1b7-49d4-964c-403acd57ecb2" id="sec.133-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.133-ssec.1" target.guid="_e8eb4a53-59bf-43c0-8248-0ebb34720451">subsection (1)</intref>, the State entity’s waste reduction and recycling plan must include the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0912877f-e8bf-4d65-a8c6-dc57f87a6148" id="sec.133-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">waste reduction and recycling targets for waste generated by the State entity in carrying out its activities;</txt></block></li><li guid="_e48c0483-0f9a-4afe-971f-c5bcae501e0b" id="sec.133-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">actions to be taken to improve waste reduction and recycling of waste generated by the State entity in carrying out its activities;</txt></block></li><li guid="_d2172f32-a794-4188-b8fa-9ace9a634cf7" id="sec.133-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the management and monitoring of the State entity’s performance under the plan;</txt></block></li><li guid="_1cb50b12-7d83-4fdb-aa58-6171ad5fc718" id="sec.133-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">information about achieving continuous improvement in waste management;</txt></block></li><li guid="_77100846-a592-45a5-a266-c514f5e30615" id="sec.133-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">other matters prescribed under a regulation about the requirements for a State entity’s waste reduction and recycling plan.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_20026727-27f0-42a9-a882-9c6e9eda5cbd" id="sec.133-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the State entity is a department (the <defterm guid="_6841c2c2-7a86-452d-ba86-2c48f9692bfd" id="sec.133-def.firstdepartment" type="definition">first department</defterm>), the chief executive of the first department may adopt, for the first department’s waste reduction and recycling plan, the waste reduction and recycling plan of another department if the other department’s plan sufficiently provides for the first department.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_fc1b7b38-ca9e-4859-987c-7f87ab5eef1f" id="sec.134" provision.type="other" spent.amends="0"><no>134</no><heading guid="_eebd1eaf-35fe-4250-8a0c-ced696ec2d38" id="sec.134-he">Matters to be complied with in the preparation and adoption of a State entity’s waste reduction and recycling plan</heading><subclause affected.by.uncommenced="0" guid="_4f8512ba-a359-4f09-af10-d4414fe75212" id="sec.134-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive officer of a State entity, in preparing or adopting a waste reduction and recycling plan for the entity, must have regard to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_814af589-05c3-4896-8cfa-4bc7ddf6a379" id="sec.134-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">current and predicted information about the entity’s waste; and</txt></block></li><li guid="_b46b89bf-e8ec-47ba-970a-4deb668d47a2" id="sec.134-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the waste and resource management hierarchy; and</txt></block></li><li guid="_8d6e4395-fcf7-4977-b517-1c895425707c" id="sec.134-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the waste and resource management principles; and</txt></block></li><li guid="_88e4ed14-5c4e-47c6-a15b-a6499417c04e" id="sec.134-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">how the goals and targets of the State’s waste management strategy will be achieved.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_83c8986e-2ace-4b8a-8395-fe7769bf94c1" id="sec.134-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.134-ssec.1" target.guid="_4f8512ba-a359-4f09-af10-d4414fe75212">Subsection (1)</intref> does not limit the matters the chief executive officer of the State entity may or ought to have regard to.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3902b7e5-662a-498d-bfb3-396e787ed08a" id="sec.134-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A waste reduction and recycling plan for a State entity must provide for the plan to be in effect for a period (the <defterm guid="_52435cc2-37bf-4f99-aba1-11b050c60a3a" id="sec.134-def.implementationperiod" type="definition">implementation period</defterm> for the plan) of at least 3 years.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_20bf91fe-93bd-4506-9342-5c3e14bf7b87" id="sec.134-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0"><intref check="valid" refid="sec.134-ssec.3" target.guid="_3902b7e5-662a-498d-bfb3-396e787ed08a">Subsection (3)</intref> does not stop a waste reduction and recycling plan being amended or replaced within the implementation period for the plan.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_73744341-7da8-4d46-8d4c-23472c426ba3" id="sec.135" provision.type="other" spent.amends="0"><no>135</no><heading guid="_6537a003-3feb-4850-8950-5a2958e34907" id="sec.135-he">Inspection and availability for purchase of plan</heading><block><txt break.before="1">The chief executive officer of a State entity must ensure that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_627edc93-f062-49b1-8e4f-a4268775e2c8" id="sec.135-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an up-to-date version of the State entity’s waste reduction and recycling plan is published on the entity’s website and may be inspected free of charge during office hours at an office of the entity nominated by the chief executive officer; and</txt></block></li><li guid="_1e9ec235-ab46-4b60-8394-737ee06a8c53" id="sec.135-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a copy of the version may be obtained from the State entity for no cost, or for a reasonable fee as decided by the chief executive officer.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_ce95db77-490d-4ea3-ac05-236fec46f2ef" id="sec.136" provision.type="other" spent.amends="0"><no>136</no><heading guid="_5457e2a8-11e4-427f-9f04-d498cbb838d8" id="sec.136-he">Review of plan</heading><block><txt break.before="1">The chief executive officer of a State entity must, at least every 3 years, review the entity’s waste reduction and recycling plan.</txt></block></clause><clause affected.by.uncommenced="0" guid="_618fa6e5-5e36-4f0b-8c7c-bcdba791054b" id="sec.137" provision.type="other" spent.amends="0"><no>137</no><heading guid="_f28e137c-7df9-42e8-89c6-f1f0b75fba45" id="sec.137-he">Amendment of plan</heading><block><txt break.before="1">The chief executive officer of a State entity may adopt an amendment of the entity’s waste reduction and recycling plan if the chief executive officer considers the amendment to be appropriate, having regard to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dd7279ad-7b92-47c5-9b7c-871fb6be8b73" id="sec.137-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">changing waste reduction and recycling opportunities; and</txt></block></li><li guid="_a4276a47-f9b2-4000-a1ea-8f7e5cc6dc0e" id="sec.137-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">changing circumstances in which the plan operates; and</txt></block></li><li guid="_dea54e70-6b29-4fa2-88a6-02bbdd9cb62d" id="sec.137-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">other matters arising from a review of the plan as required under this part; and</txt></block></li><li guid="_e481d014-6f7e-4b27-81bc-f4574bc271f0" id="sec.137-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">anything else the chief executive officer considers relevant.</txt></block></li></list></block></clause></division></part><part affected.by.uncommenced="0" guid="_317a9a04-5520-43d0-91d4-e8ee37eed351" id="ch.6-pt.4"><no>Part 4</no><heading guid="_f73b5a75-f4b3-4282-99fb-45242d7d947f" id="ch.6-pt.4-he">Planning entity strategic planning for waste</heading><division affected.by.uncommenced="0" guid="_73b4c744-3f9f-4f9a-ac58-9f8b7015d13b" id="ch.6-pt.4-div.1"><no>Division 1</no><heading guid="_2aba1d6e-01c3-4bcb-8f13-a19bfabdb190" id="ch.6-pt.4-div.1-he">Introduction</heading><clause affected.by.uncommenced="0" guid="_856829c5-e361-4ec7-87ef-99a5b09cdcff" id="sec.138" provision.type="other" spent.amends="0"><no>138</no><heading guid="_5872372e-0b70-4eb6-ab14-86080c3788c2" id="sec.138-he">Object of <intref check="valid" refid="ch.6-pt.4" target.guid="_317a9a04-5520-43d0-91d4-e8ee37eed351">pt 4</intref></heading><block><txt break.before="1">The object of this part is to provide for each entity that is a planning entity to implement a plan for managing the entity’s waste in a way that best achieves the objects of this Act.</txt></block></clause></division><division affected.by.uncommenced="0" guid="_4ac7392d-38bf-484b-a798-6116a9d4581f" id="ch.6-pt.4-div.2"><no>Division 2</no><heading guid="_06745e3e-afe1-40cb-91c2-c407e01c9e11" id="ch.6-pt.4-div.2-he">Establishing status as planning entity</heading><clause affected.by.uncommenced="0" guid="_a27a1e50-04b9-4146-9b07-2b7aae097245" id="sec.139" provision.type="other" spent.amends="0"><no>139</no><heading guid="_e9d39199-97d5-4f70-b10f-93d1e2c58e89" id="sec.139-he">Identification of planning entity and of what is relevant waste for a planning entity</heading><subclause affected.by.uncommenced="0" guid="_c1e6c393-e614-4662-9aab-c927325465d5" id="sec.139-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An entity is a <defterm guid="_7d026666-e8f0-4920-a532-f3b63395eeae" id="sec.139-def.planningentity" type="definition">planning entity</defterm> if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_08ece8ff-cc0d-47fb-8f2e-ea732e173b11" id="sec.139-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the chief executive has identified the entity as a planning entity; and</txt></block></li><li guid="_3c2b0dd1-4ae2-48f9-a775-80b3e1c35dc2" id="sec.139-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the chief executive has given the entity an information notice for the decision to identify the entity as a planning entity; and</txt></block></li><li guid="_704b461c-ec72-45f0-80a6-61f7aa911da7" id="sec.139-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">any period for the internal or external review of the decision, including any period of appeal, has expired.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2cb1a7f6-0c37-454b-a8f0-ed8ab4d05981" id="sec.139-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Also, an entity is a <defterm guid="_45bade15-90f2-47ca-bb76-da48deb1c1ca" id="sec.139-def.planningentity-oc.2" type="definition">planning entity</defterm> if the entity is part of a sector of entities (a <defterm guid="_57ad88bd-a597-40c7-84d4-38146610bc57" id="sec.139-def.sectorofplanningentities" type="definition">sector of planning entities</defterm>) prescribed under a regulation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_df7ac283-2342-4b2b-9fbf-b55b152b400a" id="sec.139-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Despite <intref check="valid" refid="sec.139-ssec.2" target.guid="_2cb1a7f6-0c37-454b-a8f0-ed8ab4d05981">subsection (2)</intref>, the chief executive is not stopped from identifying an entity as a planning entity and giving it an information notice under <intref check="valid" refid="sec.139-ssec.1" target.guid="_c1e6c393-e614-4662-9aab-c927325465d5">subsection (1)</intref> on the basis that the entity is part of a sector of planning entities.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9224c759-20cb-4195-b35e-a72456503acb" id="sec.139-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive may identify an entity as a planning entity only on the basis of 1 or more of the following, having regard to the entity’s activities—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f89e7587-5110-4fd8-be94-0163ba6c3d3f" id="sec.139-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the total waste generated by the entity in carrying on its activities is more than the threshold prescribed under a regulation;</txt></block></li><li guid="_4e98c1ba-914c-4e26-8d66-e3d117dd2dce" id="sec.139-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the entity is a planning entity under <intref check="valid" refid="sec.139-ssec.2" target.guid="_2cb1a7f6-0c37-454b-a8f0-ed8ab4d05981">subsection (2)</intref>;</txt></block></li><li guid="_5433500b-4836-4bb9-9eb7-c839f2210f1e" id="sec.139-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">waste generated by the entity in carrying on its activities is or includes waste that is a priority product prescribed under a regulation as a priority product to which this paragraph applies;</txt></block></li><li guid="_0e423c4e-614e-4708-99b7-a08e5e39ccab" id="sec.139-ssec.4-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">waste generated by the entity in carrying on its activities is or includes waste that is regulated waste prescribed under a regulation as regulated waste to which this paragraph applies.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7e76d690-bd06-4b59-bac0-81c83e3d3cdd" id="sec.139-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If an entity is identified as a planning entity on the basis of <intref check="valid" refid="sec.139-ssec.4" target.guid="_9224c759-20cb-4195-b35e-a72456503acb">subsection (4)</intref><intref check="valid" refid="sec.139-ssec.4-para1.a" target.guid="_f89e7587-5110-4fd8-be94-0163ba6c3d3f">(a)</intref>, all waste generated by the entity is <defterm guid="_f68360b3-ea4d-4661-88da-b75e0559b37c" id="sec.139-def.relevantwaste" type="definition">relevant waste</defterm> for the entity, regardless of whether the entity is also a planning entity on any other basis under this section.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ed5a068d-6d31-4ad4-95d0-e7070327bab1" id="sec.139-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">If <intref check="valid" refid="sec.139-ssec.5" target.guid="_7e76d690-bd06-4b59-bac0-81c83e3d3cdd">subsection (5)</intref> does not apply to a planning entity, the following waste is <defterm guid="_d00240ab-1e65-4f25-8b78-694212ae24d8" id="sec.139-def.relevantwaste-oc.2" type="definition">relevant waste</defterm> for the entity—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_63cd44e0-c89f-4c06-910e-09764815eb43" id="sec.139-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the entity is a planning entity on the basis of being part of a sector of planning entities—sector waste for the sector of planning entities;</txt></block></li><li guid="_58a137d1-ab03-4a70-b8c1-405b645d5c90" id="sec.139-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the entity is identified as a planning entity on the basis of <intref check="valid" refid="sec.139-ssec.4" target.guid="_9224c759-20cb-4195-b35e-a72456503acb">subsection (4)</intref><intref check="valid" refid="sec.139-ssec.4-para1.c" target.guid="_5433500b-4836-4bb9-9eb7-c839f2210f1e">(c)</intref>—the priority product prescribed under <intref check="valid" refid="sec.139-ssec.4" target.guid="_9224c759-20cb-4195-b35e-a72456503acb">subsection (4)</intref><intref check="valid" refid="sec.139-ssec.4-para1.c" target.guid="_5433500b-4836-4bb9-9eb7-c839f2210f1e">(c)</intref>;</txt></block></li><li guid="_e9101c0c-8940-43b1-abd4-d78fe83a063d" id="sec.139-ssec.6-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the entity is identified as a planning entity on the basis of <intref check="valid" refid="sec.139-ssec.4" target.guid="_9224c759-20cb-4195-b35e-a72456503acb">subsection (4)</intref><intref check="valid" refid="sec.139-ssec.4-para1.d" target.guid="_0e423c4e-614e-4708-99b7-a08e5e39ccab">(d)</intref>—the regulated waste prescribed under <intref check="valid" refid="sec.139-ssec.4" target.guid="_9224c759-20cb-4195-b35e-a72456503acb">subsection (4)</intref><intref check="valid" refid="sec.139-ssec.4-para1.d" target.guid="_0e423c4e-614e-4708-99b7-a08e5e39ccab">(d)</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_06be4a9c-7fed-4c85-af6a-32cd72b9e90d" id="sec.139-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">For <intref check="valid" refid="sec.139-ssec.6" target.guid="_ed5a068d-6d31-4ad4-95d0-e7070327bab1">subsection (6)</intref>, it does not matter if particular waste generated by an entity is relevant waste for the entity under more than 1 paragraph of the subsection.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_afaec772-5625-4957-8089-9391d30f4592" id="sec.139-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">An entity that, apart from this subsection, could be identified as a planning entity in relation to a priority product on the basis of <intref check="valid" refid="sec.139-ssec.4" target.guid="_9224c759-20cb-4195-b35e-a72456503acb">subsection (4)</intref><intref check="valid" refid="sec.139-ssec.4-para1.c" target.guid="_5433500b-4836-4bb9-9eb7-c839f2210f1e">(c)</intref>, can not be identified as a planning entity in relation to the product if the entity—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1e5403cb-acdd-4484-8ca4-cb96de5f23dd" id="sec.139-ssec.8-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is a participant in an accredited product stewardship scheme or approved program applying to the product; and</txt></block></li><li guid="_2c44274b-1f9c-4706-b55b-93d2ac41e35a" id="sec.139-ssec.8-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is meeting its obligations under the scheme or program in relation to the priority product.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_315b4f82-4ce3-48d9-b972-f007cfa8458f" id="sec.139-ssec.9" provision.type="other"><no>(9)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_76ac6c02-a5fc-4007-a9e4-cdf167452d28" id="sec.139-ssec.9-def.sectorwaste_"><txt break.before="1"><defterm guid="_cd6a6dfe-baa4-48c4-bcd7-7de0df611818" id="sec.139-ssec.9-def.sectorwaste" type="definition">sector waste</defterm>, for a sector of planning entities, means waste of the type ordinarily generated by the sector of planning entities or as identified, in the regulation prescribing the sector of planning entities, as waste ordinarily generated by the sector.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_721cb449-2816-48bc-9781-99aeb3b525fc" id="sec.140" provision.type="other" spent.amends="0"><no>140</no><heading guid="_96d97391-054a-4be3-917d-ee492fa64158" id="sec.140-he">Notification of status as planning entity</heading><subclause affected.by.uncommenced="0" guid="_18fc8e95-9399-4650-9b3a-53846c98839a" id="sec.140-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, under this part, the chief executive gives an entity an information notice for the chief executive’s decision to identify the entity as a planning entity.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9914478e-4339-4d4c-8ba9-00e85182d048" id="sec.140-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting what the information notice may or must include, the information notice must additionally include the following information—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_59c385fa-db81-417c-a4c5-208d3cc50c98" id="sec.140-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that the entity must, under the planning entity’s waste reduction and recycling plan obligation, adopt and implement a waste reduction and recycling plan for the entity’s relevant waste;</txt></block></li><li guid="_55e4d746-074f-4dab-b114-a57b90b7558f" id="sec.140-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">when the planning entity’s waste reduction and recycling plan obligation will start to apply to the entity.</txt></block></li></list></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_986b8ed2-50d2-4b90-ba67-bdc2cf4ae2ec" id="ch.6-pt.4-div.3"><no>Division 3</no><heading guid="_ae77db9c-4f70-4102-91a5-828d51942731" id="ch.6-pt.4-div.3-he">Obligation of planning entity for waste reduction and recycling plan</heading><clause affected.by.uncommenced="0" guid="_a759607e-d125-46b1-ada8-e06af4da1c41" id="sec.141" provision.type="other" spent.amends="0"><no>141</no><heading guid="_c958f6bb-6c46-4646-8da1-483e332ee936" id="sec.141-he">Planning entity’s waste reduction and recycling plan obligation</heading><subclause affected.by.uncommenced="0" guid="_c0ba2559-63a1-4a5c-842f-05c290c9ffd7" id="sec.141-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A planning entity has an obligation at all times to ensure that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_37ed2dad-4b04-459e-a044-302db3bda554" id="sec.141-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">all aspects of waste reduction and recycling for the entity’s relevant waste are comprehensively addressed by a waste reduction and recycling plan for the entity; and</txt></block></li><li guid="_9df0d65a-c881-41a0-b091-5c56e49deef3" id="sec.141-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the waste reduction and recycling plan has been adopted by the planning entity; and</txt></block></li><li guid="_9fc71005-1f42-48dc-a33e-c7959e60788d" id="sec.141-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the waste reduction and recycling plan is being implemented in accordance with its terms.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9f2588b7-1100-48ed-b754-2b456239e049" id="sec.141-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if a sector of planning entities has prepared a waste reduction and recycling plan for the sector, a planning entity, to the extent it is a planning entity because it is part of a sector of planning entities, may, in relation to the entity’s relevant waste that is also sector waste for the sector, adopt the sector’s plan as its own plan if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e9894b21-c80b-4aed-b001-790f702cee1a" id="sec.141-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the sector’s plan complies with the requirements of this chapter for a waste reduction and recycling plan for a sector of planning entities; and</txt></block></li><li guid="_f04003fe-c4e3-4a1f-9482-aa1324bffdeb" id="sec.141-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the sector’s plan effectively includes the requirements for a waste reduction and recycling plan for the entity in relation to the entity’s relevant waste that is sector waste for the sector.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e927dd6b-e078-4b9e-891c-8a300da61ef3" id="sec.141-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A planning entity must comply with the obligation stated in <intref check="valid" refid="sec.141-ssec.1" target.guid="_c0ba2559-63a1-4a5c-842f-05c290c9ffd7">subsection (1)</intref> unless it has a reasonable excuse.</txt></block><penalty guid="_e076056d-efc6-411e-ad9f-8fd7c56f295b" id="sec.141-ssec.3-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_618efe89-4c33-4995-a1b3-1d96b7f4a40a" id="sec.141-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.141-ssec.3" target.guid="_e927dd6b-e078-4b9e-891c-8a300da61ef3">subsection (3)</intref> does not start to apply to a planning entity until the day prescribed under a regulation.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_bf57b779-1b09-40bb-ae1c-f1c1cab55f4d" id="sec.142" provision.type="other" spent.amends="0"><no>142</no><heading guid="_d99888a2-ef54-44b8-86fd-28bac148f028" id="sec.142-he">Requirements for waste reduction and recycling plan</heading><subclause affected.by.uncommenced="0" guid="_d7b0eda6-84b5-4981-841e-c4a662899b31" id="sec.142-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section states requirements for a waste reduction and recycling plan for a planning entity or sector of planning entities.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e510fc65-2dd9-4ec6-baa2-e4142f9f3042" id="sec.142-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The plan must have regard to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6a3a4ea1-3df9-4570-b438-334787ddb2a6" id="sec.142-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">current and predicted information about waste; and</txt></block></li><li guid="_edd027fd-bc4f-4599-9c06-24126b57618d" id="sec.142-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the waste and resource management hierarchy; and</txt></block></li><li guid="_dcb51736-1f96-4874-957f-e97b87a09613" id="sec.142-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the waste and resource management principles; and</txt></block></li><li guid="_780b7a43-8c3f-49f4-b54b-f520fbe89017" id="sec.142-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the State’s waste management strategy; and</txt></block></li><li guid="_d39781ed-4554-4c9d-a0d7-6c90d7993397" id="sec.142-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">any other matters prescribed under a regulation about the requirements for a waste reduction and recycling plan.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_721d838b-b520-4d03-b3a4-c6e83a82e44a" id="sec.142-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The plan must include the following information—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_67f9f6eb-5c54-402c-80f5-017da7bbfa72" id="sec.142-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the amounts and types of waste that is currently generated;</txt></block></li><li guid="_3388a06f-7df2-4669-9a77-56542ed2e239" id="sec.142-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">how the waste is to be dealt with, including how and in what amounts the types of waste are to be dealt with under each of the precepts making up the waste and resource management hierarchy;</txt></block></li><li guid="_5f9c2b60-7598-4960-b81a-a000dfde4afe" id="sec.142-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">goals to reduce waste generated;</txt></block></li><li guid="_55432609-79c4-45ab-8a33-f93f41196ed6" id="sec.142-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">indicators or performance measures on which performance under the plan will be assessed;</txt></block></li><li guid="_cce008f7-690c-43ee-8a14-e20822c3dc59" id="sec.142-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">actions that will be taken to reduce waste generation and to improve recycling;</txt></block></li><li guid="_f97b888d-e038-4469-8844-b7d473a65a52" id="sec.142-ssec.3-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">any other matters prescribed under a regulation about requirements for a waste reduction and recycling plan.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_703803d5-40b9-47af-bb22-08e3281417e4" id="sec.142-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0"><intref check="valid" refid="sec.142-ssec.2" target.guid="_e510fc65-2dd9-4ec6-baa2-e4142f9f3042">Subsection (2)</intref> does not limit the matters the plan may or ought to have regard to.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bb8bcec9-d582-4627-8c0f-c73760962095" id="sec.142-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The plan must provide for it to be in effect for a period (the <defterm guid="_159c28df-a817-4198-a045-5c3b8dfd6237" id="sec.142-def.implementationperiod" type="definition">implementation period</defterm> for the plan) of at least 3 years.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_40b504eb-8fed-4893-89f2-2e126b26915d" id="sec.142-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0"><intref check="valid" refid="sec.142-ssec.5" target.guid="_bb8bcec9-d582-4627-8c0f-c73760962095">Subsection (5)</intref> does not stop the plan being amended or replaced within the implementation period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_155403a0-4bd4-421b-8d3a-7ee9d0567eee" id="sec.142-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">The plan must provide for its review at least every 3 years.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a69d08c8-cf73-42cf-8244-277e8a311202" id="sec.143" provision.type="other" spent.amends="0"><no>143</no><heading guid="_3ab5784d-fdd7-4ab3-b1aa-d856c97bf8d7" id="sec.143-he">Other matters that may be included in a waste reduction and recycling plan</heading><subclause affected.by.uncommenced="0" guid="_92d2922d-7b68-4103-a5bb-e12d73baa4fb" id="sec.143-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Without limiting what is or is not otherwise required under this division for a waste reduction and recycling plan, a waste reduction and recycling plan for a planning entity or sector of planning entities may include or otherwise provide for the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8d573d41-af7b-4677-b180-ee0fabfc9e3a" id="sec.143-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a description of the activities carried out that generate waste;</txt></block></li><li guid="_6d57db92-ce0c-4862-a31f-750295059d43" id="sec.143-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a description of the raw materials, energy and other materials used to carry out the activities mentioned in <intref check="valid" refid="sec.143-ssec.1-para1.a" target.guid="_8d573d41-af7b-4677-b180-ee0fabfc9e3a">paragraph (a)</intref>;</txt></block></li><li guid="_7f7fa366-e464-47d5-bc33-d7472f6fccc7" id="sec.143-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the conduct of an audit of waste generated in any relevant facility to establish a baseline for future measurement;</txt></block></li><li guid="_54df2452-c138-4613-ac5f-a74b426510b2" id="sec.143-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">methods for monitoring waste generated at any relevant facility;</txt></block></li><li guid="_6d7c3ae3-47e9-43a3-a576-3fd33d28d1b6" id="sec.143-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">risk management strategies that document contingency plans and emergency procedures in relation to regulated waste generated or stored, including, for example, in relation to the spillage of waste;</txt></block></li><li guid="_76d98446-6912-416f-aa8d-24d69d98a885" id="sec.143-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">a purchasing policy that incorporates measures to minimise waste generated at any relevant facility through the use of product substitution, product changes, procedural changes and the replacement of disposable items with re-usable items;</txt></block></li><li guid="_dc410ad4-f8de-40e0-97a9-309c6a0e65ed" id="sec.143-ssec.1-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">strategies for promoting the plan at relevant facilities;</txt></block></li><li guid="_994a3dba-cc29-45a5-9377-8239644dc481" id="sec.143-ssec.1-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">a mechanism for staff of the planning entities to provide feedback about the plan;</txt></block></li><li guid="_0677df70-b43c-4861-b7a8-c76610dfab4f" id="sec.143-ssec.1-para1.i" provision.type="other"><no>(i)</no><block><txt break.before="0">staff training programs about effective waste management;</txt></block></li><li guid="_22cbc7ab-7b11-49ac-b2c1-3e958f859e66" id="sec.143-ssec.1-para1.j" provision.type="other"><no>(j)</no><block><txt break.before="0">procedures for segregating waste;</txt></block></li><li guid="_2ac5bcdb-c3dc-4f92-b00a-7e369060267a" id="sec.143-ssec.1-para1.k" provision.type="other"><no>(k)</no><block><txt break.before="0">procedures for identifying and implementing opportunities to improve waste management practices;</txt></block></li><li guid="_36d30fd6-9fdd-40f3-b95c-81c343597785" id="sec.143-ssec.1-para1.l" provision.type="other"><no>(l)</no><block><txt break.before="0">opportunities, and actions to be taken, in product design, production and packaging to reduce waste;</txt></block></li><li guid="_6ddaa1ab-fcc3-44b1-ad33-8419d52af8f4" id="sec.143-ssec.1-para1.m" provision.type="other"><no>(m)</no><block><txt break.before="0">details of any management systems to be used to deal with waste.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d2df0061-7af0-42c4-a65a-91ef13ceb14d" id="sec.143-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_4e435c03-c16a-4df1-a474-9e3b4c75105b" id="sec.143-ssec.2-def.relevantfacility_"><txt break.before="1"><defterm guid="_f857bc91-9524-4478-8f45-4c3672cb0bf0" id="sec.143-ssec.2-def.relevantfacility" type="definition">relevant facility</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7c2c289d-67d3-4fef-b77a-b2de83fe9059" id="sec.143-ssec.2-def.relevantfacility-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for a waste reduction and recycling plan for a sector of planning entities—a facility of any planning entity adopting the plan; or</txt></block></li><li guid="_5685057e-f251-400b-98a4-b7c3e7b3fa09" id="sec.143-ssec.2-def.relevantfacility-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for a waste reduction and recycling plan being adopted by a planning entity on a single entity basis—a facility of the planning entity.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b72f3259-a5b0-47a4-9963-b8c082b03827" id="sec.144" provision.type="other" spent.amends="0"><no>144</no><heading guid="_9159cc82-8f8d-4800-9b86-4fd562203379" id="sec.144-he">Additional requirements for a waste reduction and recycling plan for a sector of planning entities</heading><subclause affected.by.uncommenced="0" guid="_ec1c9cfb-be4c-4a3a-bbad-72de79bf6ace" id="sec.144-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section states additional requirements for a waste reduction and recycling plan for a sector of planning entities.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8c54d252-fbaa-4f46-96bf-11210a9962f7" id="sec.144-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The plan must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bd9769c9-4825-4449-bf57-dbe49ea802a7" id="sec.144-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">identify the planning entities adopting the plan; and</txt></block></li><li guid="_f3a81a7c-3f95-450a-8e3b-67f4493ae53c" id="sec.144-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">explain how the planning entities are collectively to implement the plan; and</txt></block></li><li guid="_f2a9b828-c9a1-4728-9464-2a32e51fb93e" id="sec.144-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">describe the arrangements for the administration, funding and implementation of the plan, and identify who is responsible for administering and reporting on the plan; and</txt></block></li><li guid="_18a4b993-5346-421b-85dc-fc39723ed60f" id="sec.144-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">include any other matters prescribed under a regulation.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_55e44639-bb7f-45be-a77b-5318a590e9a8" id="sec.145" provision.type="other" spent.amends="0"><no>145</no><heading guid="_0eb92a03-3212-4228-a856-a2d226b02644" id="sec.145-he">Amendment of waste reduction and recycling plan</heading><subclause affected.by.uncommenced="0" guid="_00273dbe-8faf-4d52-b791-f913f1d5c48f" id="sec.145-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A planning entity or sector of planning entities may adopt an amendment of a waste reduction and recycling plan for the entity or sector if the entity or sector considers the amendment to be appropriate, having regard to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ad97551a-e156-46b3-9414-04619dd21697" id="sec.145-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">changing waste reduction and recycling opportunities; and</txt></block></li><li guid="_a235695b-fdec-48a8-8ed6-e86c1095bc2f" id="sec.145-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">changing circumstances in which the plan operates; and</txt></block></li><li guid="_36bdd91c-ea84-48bb-bb17-164a3a78e277" id="sec.145-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">other matters arising from a review of the plan; and</txt></block></li><li guid="_568f9681-5c18-4901-a627-9be420a7f175" id="sec.145-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">anything else the entity or sector considers relevant.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ba292b9e-9ddb-457e-ac87-7c08d3c66d40" id="sec.145-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A planning entity that has adopted the waste reduction and recycling plan of a sector of planning entities is taken to have adopted an amendment of the plan unless the terms of the adoption preclude automatic adoption of the amendment.</txt></block></subclause></clause></division></part></chapter><chapter affected.by.uncommenced="0" guid="_4e86683b-f157-496c-9291-5e24d74fcc71" id="ch.7"><no>Chapter 7</no><heading guid="_c8b5571d-7c13-478d-a0f3-a73c586ef2d7" id="ch.7-he">Reporting about waste management and waste disposal and recycling</heading><part affected.by.uncommenced="0" guid="_fdf95dd9-3a12-4f22-ab6c-d014cb9fd3d5" id="ch.7-pt.1"><no>Part 1</no><heading guid="_8a1f177a-cd65-4452-a437-be1afc6a0c5d" id="ch.7-pt.1-he">Reporting on waste reduction and recycling plans</heading><clause affected.by.uncommenced="0" guid="_8ef95698-66d5-449a-8269-b577a14fd714" id="sec.147" provision.type="other" spent.amends="0"><no>147</no><heading guid="_acf38c33-89f0-4ee9-acba-1aa618d4e1d0" id="sec.147-he">Local government reporting</heading><subclause affected.by.uncommenced="0" guid="_75b42279-4e51-4c4e-8603-7ec742b75678" id="sec.147-ssec.1AA" provision.type="other"><no>(1AA)</no><block><txt break.before="0">This section does not start to apply to a local government until 2 months after the end of the first full financial year after the day prescribed for the local government under <intref check="valid" refid="sec.123" target.guid="_773ad283-3636-4011-aff1-9e8d7e9911e5">section 123</intref><intref check="valid" refid="sec.123-ssec.1" target.guid="_ec7cb2d4-826e-493b-b5ff-35e81134d30b">(1)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e19f6b55-28a3-485b-9f99-94962fdfbe5e" id="sec.147-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Within 2 months after the end of each financial year, a local government must give the chief executive a report about the operation, in the financial year, of all the local government’s waste reduction and recycling plans in force in its local government area.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6da67444-0eba-47bf-9142-317f2aa554df" id="sec.147-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The report must be in the approved form and must otherwise comply with the requirements of this section.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9012769b-5197-4e26-9e74-d7d2e3e8cdce" id="sec.147-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the local government is not required to include in the report any information that has already been supplied to the chief executive in a waste data return in relation to a waste disposal site operated by or for the local government.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fc963288-8a00-4db9-92ea-935bcf776a99" id="sec.147-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Without limiting what the approved form may require, the approved form may require the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9f1fbad3-f1c6-4444-8318-789bdf8468c5" id="sec.147-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">details of any recycling programs conducted or managed by or for the local government during the year, including—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9de748c5-0bf5-476d-8fb4-d1b2729cac21" id="sec.147-ssec.4-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the amounts and types of waste collected and recycled, or collected and delivered to some other entity for recycling, under the programs; and</txt></block></li><li guid="_05300ed3-be97-4c4f-bae3-39f258f426d0" id="sec.147-ssec.4-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the names and addresses of the facilities used in the programs;</txt></block></li></list></block></li><li guid="_e060a570-efd2-4cba-afe5-a4ba27c0e162" id="sec.147-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">details of local government waste services to households;</txt></block></li><li guid="_9bb7255c-4bc4-4e38-9654-a9d33653a2fc" id="sec.147-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">amounts and types of waste delivered directly to waste facilities from individual households;</txt></block></li><li guid="_edc861cd-5bc4-4229-a622-949084395b6e" id="sec.147-ssec.4-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the total amount of energy generated in the year from landfill gas;</txt></block></li><li guid="_df22c947-2cc5-4d0b-b2e5-0fb0864df734" id="sec.147-ssec.4-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">details of landfills operated by or for the local government during the year, including—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b283def5-b4c1-4a0f-8898-6b8b90f7d71a" id="sec.147-ssec.4-para1.e-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the amounts and types of waste disposed of during the year to the landfills; and</txt></block></li><li guid="_aee5e94e-f0f2-4e73-80e9-26f49fd99a8c" id="sec.147-ssec.4-para1.e-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the name, address, capacity and life expectancy of each landfill that started operation during the year; and</txt></block></li><li guid="_d242d453-d025-45ac-b8a9-3cd68ac0887a" id="sec.147-ssec.4-para1.e-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the name, address and capacity of each landfill that ceased operation during the year;</txt></block></li></list></block></li><li guid="_7099d648-2ca2-45ad-82e5-c7d28745908e" id="sec.147-ssec.4-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">the amounts and types of waste collected by or for the local government and disposed of to landfill at waste facilities other than those operated by or for the local government, and the addresses of the waste facilities.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0179d610-c0e9-484b-997d-4c756eb4f143" id="sec.147-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The matters mentioned in <intref check="valid" refid="sec.147-ssec.4" target.guid="_fc963288-8a00-4db9-92ea-935bcf776a99">subsection (4)</intref> must be addressed in relation to waste generated within or outside the local government’s area.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b1e47f6f-75b3-48c9-bedd-f8d73903c831" id="sec.147-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The report must also give details of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_da3a8f56-8a88-41ab-8216-df18b9c0f41f" id="sec.147-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the types of waste generated by the local government in carrying out its activities;</txt></block></li><li guid="_aa1480a1-a58e-43b7-a747-5a80581be8ff" id="sec.147-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">actions taken to reduce the amount of waste generated by the local government in carrying out its activities;</txt></block></li><li guid="_408d0459-cd4d-4673-a1cb-4909ec0e846a" id="sec.147-ssec.6-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">actions taken to increase the use of recycled material by the local government;</txt></block></li><li guid="_1d60d531-37bc-47d2-9889-78d8b6f80f48" id="sec.147-ssec.6-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">actions taken by the local government to improve the re-use and recycling of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a33e3943-92d8-4fa1-8f61-e7d1d48df367" id="sec.147-ssec.6-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">waste generated by the local government; and</txt></block></li><li guid="_fcb51b32-f5f2-4d64-8f1c-8f062a79bead" id="sec.147-ssec.6-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the types of waste generated in the local government area;</txt></block></li></list></block></li><li guid="_0ce2d7f8-458a-4306-a5ef-27cae6a07dc2" id="sec.147-ssec.6-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the amount and types of waste that were the subject of offences against the general littering provision or the illegal dumping of waste provision and were collected by the local government;</txt></block></li><li guid="_f5776481-a4e9-45a1-8b63-2a7d42e031f9" id="sec.147-ssec.6-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">progress made by the local government, having regard to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f53c09a2-a894-4f37-afa9-229c008db75d" id="sec.147-ssec.6-para1.f-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">performance indicators, however referred to, included in the local government’s waste reduction and recycling plans; and</txt></block></li><li guid="_7947fda7-5a2f-41ce-9502-e13929d54427" id="sec.147-ssec.6-para1.f-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">any other performance indicators prescribed under a regulation for gauging performance under local government waste reduction and recycling plans;</txt></block></li></list></block></li><li guid="_2f074584-fb59-4b04-b428-0ce18f9df61b" id="sec.147-ssec.6-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">how the local government has contributed towards achieving the goals and targets under the State’s waste management strategy.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_36c018b9-3bb5-4e75-a284-efb400cb12b8" id="sec.148" provision.type="other" spent.amends="0"><no>148</no><heading guid="_21c81c01-5014-4395-962b-5251628e412b" id="sec.148-he">State entity reporting</heading><subclause affected.by.uncommenced="0" guid="_54756a63-3290-4683-b3c4-671762f2b056" id="sec.148-ssec.1AA" provision.type="other"><no>(1AA)</no><block><txt break.before="0">This section does not start to apply to the chief executive officer of a State entity until 2 months after the end of the first full financial year after the day prescribed for the State entity under <intref check="valid" refid="sec.133" target.guid="_15f0367f-8266-4147-8ff5-f5de578ccc5c">section 133</intref><intref check="valid" refid="sec.133-ssec.1" target.guid="_e8eb4a53-59bf-43c0-8248-0ebb34720451">(1)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1ccb8c01-34e2-4152-a8cc-b3b9c82b710d" id="sec.148-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Within 2 months after the end of each financial year, the chief executive officer of a State entity must give the chief executive under this Act a report, in the approved form, about the operation, in the financial year, of the State entity’s waste reduction and recycling plan.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bc24ca4f-1f26-4468-9b0b-19a87352e33c" id="sec.148-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The report must include details of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_74e03597-5f28-42d9-9a8f-efd9818fc918" id="sec.148-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the types and amounts of waste generated, recycled or disposed of by the entity in carrying out its activities;</txt></block></li><li guid="_78399379-3a07-4366-bca3-e4db4f13ad79" id="sec.148-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any actions taken by the entity to reduce the amount of waste generated by the entity;</txt></block></li><li guid="_439acc4e-1006-48b9-9431-90950ab17304" id="sec.148-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">actions taken by the entity to recover and re-use or recycle waste;</txt></block></li><li guid="_cbdc65e6-9ad7-4169-91eb-27b1c14c0a5f" id="sec.148-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">actions taken by the entity to increase the use of recycled materials;</txt></block></li><li guid="_43ce2cf6-5d5f-4a47-bc0b-510280a4f2c4" id="sec.148-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">progress made by the entity, having regard to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9608f3b9-673a-45af-acc5-dc4b4febbde9" id="sec.148-ssec.2-para1.e-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">performance indicators, however referred to, included in the entity’s waste reduction and recycling plan; and</txt></block></li><li guid="_f08419aa-ad86-4c00-9962-c2067bf2c9f9" id="sec.148-ssec.2-para1.e-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">any other performance indicators prescribed under a regulation for gauging performance under State entity waste reduction and recycling plans;</txt></block></li></list></block></li><li guid="_ab244f51-c4ab-44c3-9e50-d497295ae669" id="sec.148-ssec.2-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">how the entity has contributed towards achieving the goals and targets under the State’s waste management strategy;</txt></block></li><li guid="_24621f0c-c394-4086-871e-0b25273a1c93" id="sec.148-ssec.2-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">the amount and types of waste that were the subject of littering or illegal dumping and were collected by the entity;</txt></block></li><li guid="_628820a3-98f2-4f9d-a9ab-7279c82003c7" id="sec.148-ssec.2-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">any other matters prescribed under a regulation about requirements for reporting on State entity waste reduction and recycling plans.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_49fc724a-0dfa-4eb9-ae32-6874a12eac76" id="sec.149" provision.type="other" spent.amends="0"><no>149</no><heading guid="_643179d1-a472-4abb-949c-77416e3b0f32" id="sec.149-he">Planning entity reporting</heading><subclause affected.by.uncommenced="0" guid="_8eba44b8-aefa-4abd-8e84-794ebd6f3fdc" id="sec.149-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A planning entity must give the chief executive a report, in the approved form and otherwise in compliance with the requirements of this section, about the operation, in the period covered by the report, of any waste reduction and recycling plan adopted by the entity.</txt></block><penalty guid="_e1ed0f8c-02d4-4ba6-acb8-d686b0977a22" id="sec.149-ssec.1-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_d2bbb2fe-ceb4-41e8-abd8-8b16021c7b48" id="sec.149-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A report under <intref check="valid" refid="sec.149-ssec.1" target.guid="_8eba44b8-aefa-4abd-8e84-794ebd6f3fdc">subsection (1)</intref> must be given—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3212ba93-7c6b-41d9-ad87-f80f025d9503" id="sec.149-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for the first report under this section—within 2 months after the end of the first full financial year after the day prescribed for the planning entity under <intref check="valid" refid="sec.141" target.guid="_a759607e-d125-46b1-ada8-e06af4da1c41">section 141</intref><intref check="valid" refid="sec.141-ssec.4" target.guid="_618efe89-4c33-4995-a1b3-1d96b7f4a40a">(4)</intref>; and</txt></block></li><li guid="_9f931af4-b07a-40e0-968f-c80d3c44a566" id="sec.149-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for subsequent reports, and unless another interval is provided for under a regulation—at intervals of not more than 3 years after the giving of the first report.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b5003f19-e829-4d2a-9f10-204d6ff296a7" id="sec.149-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The period covered by a report must be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3845d54f-1823-4587-b3b5-233d0f8ed19f" id="sec.149-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for the first report—the first full financial year mentioned in <intref check="valid" refid="sec.149-ssec.2" target.guid="_d2bbb2fe-ceb4-41e8-abd8-8b16021c7b48">subsection (2)</intref><intref check="valid" refid="sec.149-ssec.2-para1.a" target.guid="_3212ba93-7c6b-41d9-ad87-f80f025d9503">(a)</intref>; and</txt></block></li><li guid="_f78c131c-3325-44e6-a223-c1133d375e2a" id="sec.149-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for any subsequent report—the period since the last period covered by a report under this section.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_804f041b-164d-43c5-b8d4-99d5f7254268" id="sec.149-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A report under <intref check="valid" refid="sec.149-ssec.1" target.guid="_8eba44b8-aefa-4abd-8e84-794ebd6f3fdc">subsection (1)</intref> must include details of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_027d943f-1717-4114-8138-d86ad7b60465" id="sec.149-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the types and amounts of waste generated, recycled or disposed of by the entity;</txt></block></li><li guid="_7bdac79c-47d8-4425-847a-3035c9aa2eaf" id="sec.149-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any actions taken by the entity to reduce the amount of waste generated by the entity;</txt></block></li><li guid="_c0f62195-cbae-47d8-93e7-9926c5e5b81b" id="sec.149-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">actions taken by the entity to recover and re-use or recycle waste;</txt></block></li><li guid="_454b8ed9-f5e7-419a-a0e7-fd609cea44a1" id="sec.149-ssec.4-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">actions taken by the entity to increase the use of recycled materials;</txt></block></li><li guid="_b94fe6d2-7242-493e-8676-14951941898c" id="sec.149-ssec.4-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">progress made by the entity, having regard to performance indicators, however referred to, included in any waste reduction and recycling plan adopted by the entity;</txt></block></li><li guid="_50c469c1-850d-4890-ac43-60dae30162eb" id="sec.149-ssec.4-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">any other matters prescribed under a regulation about requirements for reporting on planning entity waste reduction and recycling plans.</txt></block></li></list></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_41cfdce5-1d66-4e20-a550-f5e7577f210f" id="ch.7-pt.2"><no>Part 2</no><heading guid="_537e0ed1-fc36-4688-b870-872ffa451e18" id="ch.7-pt.2-he">Reporting on waste recovery and disposal</heading><division affected.by.uncommenced="0" guid="_12c52924-d3a5-4de4-aa40-e726d5a35e1b" id="ch.7-pt.2-div.1"><no>Division 1</no><heading guid="_dee87cea-598e-4076-ac60-ceea62f8dfdd" id="ch.7-pt.2-div.1-he">Establishing status as reporting entity</heading><clause affected.by.uncommenced="0" guid="_85142930-4988-43fd-ad83-7b4d2231691f" id="sec.150" provision.type="other" spent.amends="0"><no>150</no><heading guid="_1afc90d4-1768-46a9-9996-72f1aad32246" id="sec.150-he">Identification of reporting entity</heading><subclause affected.by.uncommenced="0" guid="_cc728338-a1c9-452f-9194-dec882077981" id="sec.150-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An entity is a <defterm guid="_aabe6b8d-f393-4134-bba3-26b59d9e02ee" id="sec.150-def.reportingentity" type="definition">reporting entity</defterm> if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4b200625-b605-4568-9463-76baf2762c66" id="sec.150-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the chief executive has identified the entity as a reporting entity; and</txt></block></li><li guid="_6426d250-78ee-423f-a8af-41378c0bd0f8" id="sec.150-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the chief executive has given the entity an information notice for the decision to identify the entity as a reporting entity; and</txt></block></li><li guid="_2d869cad-164f-44d6-a5a9-3eb3f52e9ba5" id="sec.150-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">any period for the internal or external review of the decision, including any period of appeal, has expired.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9b46a550-ba4b-43d1-a899-c565a4f3d813" id="sec.150-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Also, an entity is a <defterm guid="_ef9fd7d1-e9a9-4791-9049-311fbccb6330" id="sec.150-def.reportingentity-oc.2" type="definition">reporting entity</defterm> if the entity—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_76d287ef-f1ba-4c56-890c-941a12f3305e" id="sec.150-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">receives, sorts, recycles, treats or disposes of waste above a threshold prescribed under a regulation; and</txt></block></li><li guid="_9cb1157e-1f9a-4d38-897e-cc9ee6a6c45f" id="sec.150-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is part of a sector of entities (a <defterm guid="_9ceb0cc1-ec4c-4d94-8fcd-d9a04d77388e" id="sec.150-ssec.2-def.sectorofreportingentities" type="definition">sector of reporting entities</defterm>) prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0fe9b1cd-adf3-44dc-b635-39ac2f03d2c8" id="sec.150-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Despite <intref check="valid" refid="sec.150-ssec.2" target.guid="_9b46a550-ba4b-43d1-a899-c565a4f3d813">subsection (2)</intref>, the chief executive is not stopped from identifying an entity as a reporting entity and giving it an information notice under <intref check="valid" refid="sec.150-ssec.1" target.guid="_cc728338-a1c9-452f-9194-dec882077981">subsection (1)</intref> on the basis that the entity is part of a sector of reporting entities.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_915ba8ce-4236-4b04-92cf-cd9eb4e44efd" id="sec.150-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive may identify an entity as a reporting entity only on the basis of 1 or more of the following, having regard to the entity’s activities—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e8a20911-a973-4d23-9e4b-134e3c01cf7d" id="sec.150-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the entity receives, sorts, recycles, treats or disposes of waste above a threshold prescribed under a regulation;</txt></block></li><li guid="_18c0edef-9019-43e4-affa-279f4c8c065e" id="sec.150-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the entity is a reporting entity under <intref check="valid" refid="sec.150-ssec.2" target.guid="_9b46a550-ba4b-43d1-a899-c565a4f3d813">subsection (2)</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b603ea1f-8f70-46a6-9198-6a124d484321" id="sec.150-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">A regulation for this section may prescribe different thresholds for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b9b1e788-f133-4731-a5e7-a0765a26175e" id="sec.150-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">different entities; or</txt></block></li><li guid="_b28d04f1-12f8-42f6-b5ee-5041b360efb6" id="sec.150-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">different types of waste; or</txt></block></li><li guid="_584c9174-b6cd-4414-a255-4f7b510d2468" id="sec.150-ssec.5-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">entities in different locations in the State.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_180bc215-2ff3-4fee-a9f6-5cbf3a0f2403" id="sec.151" provision.type="other" spent.amends="0"><no>151</no><heading guid="_19e9fb86-4515-4b3f-be53-d9fa8cc207d9" id="sec.151-he">Notification of status as reporting entity</heading><subclause affected.by.uncommenced="0" guid="_a6b94e9b-ebfc-4887-af57-ed1450f44e23" id="sec.151-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, under this part, the chief executive gives an entity an information notice for the chief executive’s decision to identify the entity as a reporting entity.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c2e72d63-a283-4134-8014-b8731d6d46db" id="sec.151-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting what the information notice may include, the information notice must include the following information—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3011a0cb-e09b-41b1-afc2-359524161a5b" id="sec.151-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that the entity must, under the reporting entity obligation, within 2 months after the end of each financial year, give the chief executive a report about the entity’s receiving, sorting, recycling, treatment or disposal of waste;</txt></block></li><li guid="_826eaeb5-cadd-405e-8172-ba80e1f6ba5d" id="sec.151-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">when the reporting entity obligation will start to apply to the entity.</txt></block></li></list></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_1de1919f-31ec-4a33-af2b-ece51ac94b61" id="ch.7-pt.2-div.2"><no>Division 2</no><heading guid="_99abf613-696f-4115-bf25-c70915b54ef1" id="ch.7-pt.2-div.2-he">Reporting requirements</heading><clause affected.by.uncommenced="0" guid="_12fd2811-c61c-4e82-90c5-b7c0eb71d4a8" id="sec.152" provision.type="other" spent.amends="0"><no>152</no><heading guid="_52069170-f4aa-4d87-b576-c7952ff13a1b" id="sec.152-he">Reporting entity obligation</heading><subclause affected.by.uncommenced="0" guid="_d847e9cc-aebf-4b94-96be-8c187ace58a3" id="sec.152-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A reporting entity has an obligation to give the chief executive, within 2 months after the end of each financial year, a report in the approved form and in compliance with the requirements under this division, about the entity’s receiving, sorting, recycling, treatment or disposal of waste in the financial year.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_19293132-e47e-4584-9f29-d32d266416a5" id="sec.152-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A reporting entity that has an obligation under <intref check="valid" refid="sec.152-ssec.1" target.guid="_d847e9cc-aebf-4b94-96be-8c187ace58a3">subsection (1)</intref> must comply with the obligation unless it has a reasonable excuse.</txt></block><penalty guid="_3ad0c6b2-3ceb-400c-ac59-952bad6c814b" id="sec.152-ssec.2-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></subclause></clause><clause affected.by.uncommenced="0" guid="_92d2fcc5-3f24-4d58-b0d8-2f439f60941c" id="sec.153" provision.type="other" spent.amends="0"><no>153</no><heading guid="_c6508019-5565-4714-927d-e2d5b862832c" id="sec.153-he">Requirements for report</heading><subclause affected.by.uncommenced="0" guid="_71adf53d-cf70-4e3a-ae54-71d6f1198698" id="sec.153-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A report given by a reporting entity under this division must include details of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4a0e939f-9dc3-4273-a932-c8858e45f835" id="sec.153-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the types and amounts of waste received, sorted, recycled, treated or disposed of by the entity;</txt></block></li><li guid="_a95378c7-b3bc-4a40-997c-1bb9a9c13aac" id="sec.153-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the types and amounts of waste received from local government sources, and the types and amounts of waste received from other sources;</txt></block></li><li guid="_c56c7927-468b-40d1-a6ee-a63a902fc326" id="sec.153-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the types and amounts of each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_346375db-7f77-4d2f-8725-d627a01fe54f" id="sec.153-ssec.1-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">waste recycled by the entity;</txt></block></li><li guid="_6cf13812-53ac-4e7b-8437-27afc1f0a8ce" id="sec.153-ssec.1-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">waste sent to other recyclers in Queensland;</txt></block></li><li guid="_2acf6e2f-6c69-403a-a5fe-006fa00d069e" id="sec.153-ssec.1-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">waste sent to other recyclers in Australia other than in Queensland;</txt></block></li><li guid="_f180a44c-9a75-48da-8a83-e338a437be23" id="sec.153-ssec.1-para1.c-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">waste sent to other recyclers outside Australia;</txt></block></li></list></block></li><li guid="_66ccd99a-a0b3-422f-86a9-191238ab2bb6" id="sec.153-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">any other matters prescribed under a regulation about requirements for reporting on waste recovery and disposal.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_de8ffd42-a3f0-42b5-b317-59d703acc5cf" id="sec.153-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the report is not required to include any information that has already been supplied to the chief executive in a waste data return in relation to a waste disposal site.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_97cef636-231d-49e3-95a5-b0f5f7b43555" id="ch.7-pt.3"><no>Part 3</no><heading guid="_da9d702d-a3a0-417f-989d-f4b5a46667bb" id="ch.7-pt.3-he">Reporting on waste disposal and recycling</heading><clause affected.by.uncommenced="0" guid="_cebfc83d-b157-4e49-96f1-43a7f65cef47" id="sec.154" provision.type="other" spent.amends="0"><no>154</no><heading guid="_47f12b40-d7f4-4b22-8c30-1799525df632" id="sec.154-he">Annual report on waste disposal and recycling</heading><subclause affected.by.uncommenced="0" guid="_6ce678fc-1aa0-4cf9-9f6d-4ec226b23fd4" id="sec.154-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must, by 31 December in each year, prepare and make publicly available a report that summarises the amounts of waste and recycling reported in the most recently completed financial year.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3181f496-9cb4-4284-92dd-5c3e67d32269" id="sec.154-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In preparing the report, the chief executive must have regard to information given to the chief executive under <intref check="valid" refid="ch.7-pt.1" target.guid="_fdf95dd9-3a12-4f22-ab6c-d014cb9fd3d5">parts 1</intref> and <intref check="valid" refid="ch.7-pt.2" target.guid="_41cfdce5-1d66-4e20-a550-f5e7577f210f">2</intref> and <intref check="valid" refid="ch.3" target.guid="_9d174c0e-d3d4-4fcd-b62c-7b3babd007b7">chapter 3</intref>, <intref check="valid" refid="ch.3-pt.5" target.guid="_156dde05-c31d-47ad-a85b-453d60e42c31">part 5</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a93c943a-6cc8-465b-98d9-c80e1f297bce" id="sec.154-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The report must include the following information and, if appropriate, an evaluation of the information—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_53e4f25c-2e5b-498e-955f-c1e20584dbd0" id="sec.154-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the total amount of the waste levy paid to the State; </txt></block></li><li guid="_7a0590db-6e16-4f2d-bcab-10ac89f894e6" id="sec.154-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the amount and types of waste on which the waste levy was paid to the State; </txt></block></li><li guid="_a9aae8fb-1a0d-4761-871c-fa1187d991b1" id="sec.154-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the amounts and types of waste on which the waste levy would have been paid if it were not exempt waste; </txt></block></li><li guid="_97cb3e07-f029-4c52-a2cb-f6e4524e530c" id="sec.154-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the number of levyable waste disposal sites in the waste levy zone and non-levy zone that received waste on which the waste levy was paid to the State;</txt></block></li><li guid="_876d9a25-8705-47fd-9cef-953d787d812c" id="sec.154-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the amounts of annual payments made to local governments under <intref check="valid" refid="sec.73D" target.guid="_ebaa94df-08ad-46ab-b011-39b062ad922c">section 73D</intref>;</txt></block></li><li guid="_0798a106-8916-43c6-ba1f-45111e02ac1f" id="sec.154-ssec.3-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">the amounts and types of waste reported as being recycled by local governments;</txt></block></li><li guid="_20102a72-26d4-4721-9735-7b1fb9101fdc" id="sec.154-ssec.3-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">the amounts and types of waste reported as being recycled by reporting entities;</txt></block></li><li guid="_d5266b3e-cc3b-4da9-84d0-9699b39ed18c" id="sec.154-ssec.3-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">the amounts and types of waste reported as being disposed of by local governments;</txt></block></li><li guid="_6c278c19-97dc-44da-983f-565cf9093793" id="sec.154-ssec.3-para1.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the amounts and types of waste reported as being disposed of by reporting entities;</txt></block></li><li guid="_36307248-ecb6-4a5b-af8a-78119ddfb696" id="sec.154-ssec.3-para1.j" provision.type="other"><no>(j)</no><block><txt break.before="0">the amounts and types of waste reported as being the subject of littering or illegal dumping;</txt></block></li><li guid="_a2350241-5b02-4e7b-8354-91f190e2193f" id="sec.154-ssec.3-para1.k" provision.type="other"><no>(k)</no><block><txt break.before="0">the number of product stewardship schemes in effect under this Act;</txt></block></li><li guid="_2dfb7af6-904b-4cd2-91fd-7a1b94cbdc1d" id="sec.154-ssec.3-para1.l" provision.type="other"><no>(l)</no><block><txt break.before="0">the number of local governments that have adopted a waste reduction and recycling plan and have reported on the plan;</txt></block></li><li guid="_902a79cd-3e90-463b-bc2f-5b3b22ffb892" id="sec.154-ssec.3-para1.m" provision.type="other"><no>(m)</no><block><txt break.before="0">the number of State entities that have adopted a waste reduction and recycling plan and have reported on the plan;</txt></block></li><li guid="_17b0dc2e-9f34-4503-8955-8cbdce869e47" id="sec.154-ssec.3-para1.n" provision.type="other"><no>(n)</no><block><txt break.before="0">the number of planning entities that have adopted waste reduction and recycling plans, other than by adopting the waste reduction and recycling plan of a sector of reporting entities;</txt></block></li><li guid="_41201412-ca79-4ed0-9f4b-3090119f26cb" id="sec.154-ssec.3-para1.o" provision.type="other"><no>(o)</no><block><txt break.before="0">the number of waste reduction and recycling plans that are in place for sectors of reporting entities.</txt></block></li></list></block></subclause></clause></part></chapter><chapter affected.by.uncommenced="0" guid="_598380ab-31bf-4319-8271-2fc98c9c0cef" id="ch.8"><no>Chapter 8</no><heading guid="_164123f5-cdd7-42d0-9aff-a37001796fb5" id="ch.8-he">Provisions for end of waste</heading><part affected.by.uncommenced="0" guid="_ce1f3455-5197-4dd6-b30a-497eeff62c65" id="ch.8-pt.1"><no>Part 1</no><heading guid="_9636d106-b9f3-456e-abb7-7dc5e2a342fe" id="ch.8-pt.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_ea60f7e6-134f-45f3-9ec6-29c50cd28871" id="sec.155" provision.type="other" spent.amends="0"><no>155</no><heading guid="_c40b1d22-2065-42e7-8d52-ed66495a5f9d" id="sec.155-he">Purpose of chapter</heading><subclause affected.by.uncommenced="0" guid="_3319c01d-9e9c-41fe-ab84-c2f23c60b0d0" id="sec.155-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The purpose of this chapter is to provide for the process by which the chief executive decides when and how waste stops being waste and becomes a resource.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ca0a93ce-293e-48ce-94c3-219540a9e460" id="sec.155-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Waste stops being a waste and becomes a <defterm guid="_09138e10-8c59-4079-abe3-ec92bb6518c3" id="sec.155-def.resource" type="definition">resource</defterm> when, in accordance with an end of waste code or end of waste approval, it stops being waste and becomes a resource.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0f1241a7-7aed-4b5b-b494-a9fadf2d3e03" id="sec.155-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A person is a <defterm guid="_6213a784-460f-44fb-9bd2-fbda614af453" id="sec.155-def.resourceuser" type="definition">resource user</defterm> while the person uses a resource in a way, or for a purpose, that complies with an end of waste code or end of waste approval.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c20e0a25-fbab-4fbe-98d2-bc09697aa7b4" id="sec.155-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If a person stops using a resource in a way, or for a purpose, that complies with an end of waste code or end of waste approval—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f6c2024b-4b43-44d6-9e5e-a60c04c37fb2" id="sec.155-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the person stops being a resource user; and</txt></block></li><li guid="_a28b6a4c-c30f-4471-acef-e83c1414968c" id="sec.155-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the resource stops being a resource and becomes waste.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_475775cb-1225-4273-a6a1-084d20d8d817" id="sec.156" provision.type="other" spent.amends="0"><no>156</no><heading guid="_17d41db8-0726-42bc-831a-0bb5b0c163f2" id="sec.156-he">Definitions for ch 8</heading><block><txt break.before="1">In this chapter—</txt><deflist><definition affected.by.uncommenced="0" guid="_a90214cf-51ad-4562-a035-ec07a0ff9fb2" id="sec.156-def.amend_"><txt break.before="1"><defterm guid="_dc301777-c43f-4cf3-8624-7e83b57f12e7" id="sec.156-def.amend" type="definition">amend</defterm>, an end of waste approval, includes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2dde8780-4621-416c-b2a5-81171f26c277" id="sec.156-def.amend-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">amending or removing a condition imposed on the approval; and</txt></block></li><li guid="_5e64383e-a653-48d3-a9d4-4bdb3d2602fe" id="sec.156-def.amend-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">imposing a new condition on the approval; and</txt></block></li><li guid="_9a992994-5b2b-4729-9e3a-f7a7f808b023" id="sec.156-def.amend-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">amending the period of the approval.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_09a5eddd-d314-4ed5-900e-f29cbea9f755" id="sec.156-def.endofwasteapproval_"><txt break.before="1"><defterm guid="_5d3415a6-a585-4513-844d-7e1369dcd9c6" id="sec.156-def.endofwasteapproval" type="definition">end of waste approval</defterm> see <intref check="valid" refid="sec.159" target.guid="_537f1b79-14a6-44eb-9cea-ff2a661cc010">section 159</intref><intref check="valid" refid="sec.159-ssec.2" target.guid="_03f84e2c-b35b-4dfd-b8a0-1430c4dc0213">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_4beda2d5-953a-44a8-bfce-78618de287e6" id="sec.156-def.endofwastecode_"><txt break.before="1"><defterm guid="_912430b7-cfed-4f59-a1ff-28c3c26c0e53" id="sec.156-def.endofwastecode" type="definition">end of waste code</defterm> see <intref check="valid" refid="sec.159" target.guid="_537f1b79-14a6-44eb-9cea-ff2a661cc010">section 159</intref><intref check="valid" refid="sec.159-ssec.1" target.guid="_9f95d179-20b4-43f9-8f13-c7659c484028">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_0bdd949a-8513-46a5-a376-8eba9a3015f2" id="sec.156-def.materialenvironmentalharm_"><txt break.before="1"><defterm guid="_70464656-8ba5-46ad-ad6a-db79f0a1de07" id="sec.156-def.materialenvironmentalharm" type="definition">material environmental harm</defterm> see the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Environmental Protection Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.16" target.doc.id="act-1994-062" target.guid="_88a0a0c2-9de7-4727-a63d-cbb5f6672113" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act">section 16</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_9d5f114a-b851-4b67-8b85-be990baae8e9" id="sec.156-def.registeredresourceproducer_"><txt break.before="1"><defterm guid="_f6137570-8f88-47bf-b1c0-04fff67ce11c" id="sec.156-def.registeredresourceproducer" type="definition">registered resource producer</defterm> means a person who is registered for an end of waste code under <intref check="valid" refid="sec.173B" target.guid="_5a00b3e0-146d-4629-ac53-5c743b7ba338">section 173B</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_d8c9b700-eea6-4e91-95b3-25ebbd0bc2e6" id="sec.156-def.resource_"><txt break.before="1"><defterm guid="_7e9e01e5-7498-45a6-86c7-94bcbb5750c2" id="sec.156-def.resource" type="definition">resource</defterm> see <intref check="valid" refid="sec.155" target.guid="_ea60f7e6-134f-45f3-9ec6-29c50cd28871">section 155</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_426f4065-8e18-41fb-8c11-60093f280c11" id="sec.156-def.resourceuser_"><txt break.before="1"><defterm guid="_1068b4ac-053d-4567-9a24-5058fc9d9c72" id="sec.156-def.resourceuser" type="definition">resource user</defterm> see <intref check="valid" refid="sec.155" target.guid="_ea60f7e6-134f-45f3-9ec6-29c50cd28871">section 155</intref><intref check="valid" refid="sec.155-ssec.3" target.guid="_0f1241a7-7aed-4b5b-b494-a9fadf2d3e03">(3)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_062fbaa2-68fc-4183-8b2e-8a9958622d85" id="sec.156-def.seriousenvironmentalharm_"><txt break.before="1"><defterm guid="_e19d3237-3f5c-4012-ac5c-2d809f1d0b1f" id="sec.156-def.seriousenvironmentalharm" type="definition">serious environmental harm</defterm> see the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Environmental Protection Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.17" target.doc.id="act-1994-062" target.guid="_d28bc7e1-e454-4f2f-9f44-936840c862a1" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act">section 17</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_5922aee1-600c-4cc0-8cd7-f8b42d5b90f7" id="sec.156-def.technicaladvisorypanel_"><txt break.before="1"><defterm guid="_0c840563-ead1-4e64-bfce-255c13befb36" id="sec.156-def.technicaladvisorypanel" type="definition">technical advisory panel</defterm> see <intref check="valid" refid="sec.173G" target.guid="_8e27f1ef-73d8-4f59-85fb-6008167b9d2f">section 173G</intref>.</txt></definition></deflist></block></clause><clause affected.by.uncommenced="0" guid="_f6305182-ff36-4da1-aea9-2ac106058a9f" id="sec.157" provision.type="other" spent.amends="0"><no>157</no><heading guid="_7b03f737-8981-442f-ae46-430beecb3d0c" id="sec.157-he">Effect of operating under end of waste code if unregistered</heading><subclause affected.by.uncommenced="0" guid="_1e4aa39d-f1ac-4b13-9a2b-83bf0ed765f2" id="sec.157-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_69c29f60-bbb3-43ce-b88a-2b9ceb3b4fbd" id="sec.157-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a person, under an end of waste code, produces a resource and uses, sells or gives away the resource; and</txt></block></li><li guid="_8dde4397-7f2c-4f11-9f74-0e2aa2c6812d" id="sec.157-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the person is not a registered resource producer for the code.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_abba7954-a764-4f24-a396-bebe31044be9" id="sec.157-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The resource is taken to be waste until the person becomes a registered resource producer for the code.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_127325aa-09ca-453b-90f0-03554827f07c" id="sec.158" provision.type="other" spent.amends="0"><no>158</no><heading guid="_63b78c1c-4a47-4bff-a7e9-2c04c2cff92a" id="sec.158-he">Compliance with end of waste code</heading><subclause affected.by.uncommenced="0" guid="_04b24a97-d5e7-4d55-a995-a3ff3596ba87" id="sec.158-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A registered resource producer for an end of waste code for a resource must not do any of the following unless the producer complies with the requirements of the code—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bbc62dc0-12e1-4ebf-879a-87a87c2744c4" id="sec.158-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">produce the resource;</txt></block></li><li guid="_43e4d8ad-18bd-4eee-a32a-43ec4b464d7b" id="sec.158-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">use, sell or give away the resource.</txt></block></li></list><penalty guid="_61100b90-194b-4994-a23f-d98ba056efee" id="sec.158-ssec.1-pen"><block><txt break.before="1">Maximum penalty—1,665 penalty units.</txt></block></penalty></block></subclause><subclause affected.by.uncommenced="0" guid="_909941b8-6640-44cb-91ec-e8747348e2be" id="sec.158-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A person, other than a registered resource producer, must not use a resource in a way, or for a purpose, that does not comply with an end of waste code for the resource.</txt><penalty guid="_f1993bf4-e12e-4587-9b5d-d7aec99e15b8" id="sec.158-ssec.2-pen"><block><txt break.before="1">Maximum penalty—1,665 penalty units.</txt></block></penalty></block></subclause></clause><clause affected.by.uncommenced="0" guid="_537f1b79-14a6-44eb-9cea-ff2a661cc010" id="sec.159" provision.type="other" spent.amends="0"><no>159</no><heading guid="_6141951c-d735-4013-a1ef-9b4456d5fd36" id="sec.159-he">Chief executive may make end of waste codes and grant end of waste approvals</heading><subclause affected.by.uncommenced="0" guid="_9f95d179-20b4-43f9-8f13-c7659c484028" id="sec.159-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may make a code (an <defterm guid="_a874702c-cb83-48df-91ca-0d4ce2b1fd34" id="sec.159-def.endofwastecode" type="definition">end of waste code</defterm>) that states—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_59764b5c-0e30-4f16-8412-1b43b33bfdd3" id="sec.159-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for registered resource producers—when a particular waste stops being a waste and becomes a resource; or</txt></block></li><li guid="_8c0f9ea3-afff-49f5-9d1a-4d02be5cdaac" id="sec.159-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for resource users—conditions about using a resource, including, for example, conditions about how, and the purposes for which, a resource may be used.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_03f84e2c-b35b-4dfd-b8a0-1430c4dc0213" id="sec.159-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may grant an approval (an <defterm guid="_655d05f3-e90a-4512-8900-d990bd28a2c9" id="sec.159-def.endofwasteapproval" type="definition">end of waste approval</defterm>) to a person that states—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ba644952-03de-40de-a4af-8c73a3fbd19d" id="sec.159-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">when a particular waste stops being a waste and becomes a resource; or</txt></block></li><li guid="_e6cf940e-f81d-423d-810b-1d7140a7cdcd" id="sec.159-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">conditions about using a resource, including, for example, conditions about how, and the purposes for which, a resource may be used.</txt></block></li></list></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_920ec791-c4bc-4602-bbd8-ecc394288b37" id="ch.8-pt.2"><no>Part 2</no><heading guid="_4de59097-16d5-4ce6-8a46-8e2af68387b3" id="ch.8-pt.2-he">End of waste codes</heading><division affected.by.uncommenced="0" guid="_cede638f-2da6-4037-87ea-4348430fd0a3" id="ch.8-pt.2-div.1"><no>Division 1</no><heading guid="_10b2f17b-c44a-4da8-8cf7-21f26c40395f" id="ch.8-pt.2-div.1-he">Process for making end of waste codes</heading><clause affected.by.uncommenced="0" guid="_3175ab7d-7237-4939-bacf-80a79eae3965" id="sec.159A" provision.type="other" spent.amends="0"><no>159A </no><heading guid="_a30be41f-c49d-4fbc-aab7-12a6ef5e6a8c" id="sec.159A-he">Chief executive’s decision to make end of waste code</heading><block><txt break.before="1">The chief executive may decide to make a draft end of waste code for a particular waste—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1f18e807-8bbb-4b1a-8f19-7f3a8bccff5c" id="sec.159A-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">on the chief executive’s own initiative; or</txt></block></li><li guid="_c698f938-af5c-4c43-a013-7123e49ae33e" id="sec.159A-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">after inviting submissions under <intref check="valid" refid="sec.160" target.guid="_6ed99c3c-fad1-48f7-8867-3c279d1935b7">section 160</intref>.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_cfae1cbf-381e-4a40-b839-2f4713c95e68" id="sec.159B" provision.type="other" spent.amends="0"><no>159B </no><heading guid="_1485b5e3-7c85-49e6-a4dd-a1192a39e993" id="sec.159B-he">Schedule of proposed end of waste codes</heading><subclause affected.by.uncommenced="0" guid="_0e8ce149-88ba-4f2c-b04f-af3d794e420e" id="sec.159B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must keep an up-to-date schedule of draft end of waste codes the chief executive has decided to prepare.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_625ecffd-7cb8-40e6-b8fa-3c2f67ba33fe" id="sec.159B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.159B-ssec.1" target.guid="_0e8ce149-88ba-4f2c-b04f-af3d794e420e">subsection (1)</intref>, the chief executive must update the schedule after considering submissions under <intref check="valid" refid="sec.161" target.guid="_dcfc42e5-4eed-468d-85bf-1bbbdead74cb">section 161</intref> and deciding whether or not to make a draft end of waste code for a particular waste.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_81e1e144-2658-466f-8b0b-a808916f801b" id="sec.159B-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The schedule must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1c4fc414-f4d1-41f3-a22e-f9a68b3f46dc" id="sec.159B-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the following for each proposed draft end of waste code included in the schedule—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_55d5cc81-9e79-4ddd-afbd-0f0853f071a5" id="sec.159B-ssec.3-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the particular waste to be the subject of the draft code;</txt></block></li><li guid="_defdba3d-3f9b-4b2d-a3ec-09fdd6113c28" id="sec.159B-ssec.3-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the proposed use of a resource under the draft code;</txt></block></li><li guid="_4d952e8e-035b-4120-ba48-17e3a37f2b34" id="sec.159B-ssec.3-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">when the process for making the draft code will start and end;</txt></block></li><li guid="_b909b34d-f166-44d0-93dc-c802f2511886" id="sec.159B-ssec.3-para1.a-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">whether a technical advisory panel will be established to prepare the draft code and, if so, when the panel will be required to give the draft code to the chief executive;</txt></block></li><li guid="_38e56cda-9a97-4389-bf64-afdcc6c02c80" id="sec.159B-ssec.3-para1.a-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">that a person may register the person’s interest in being consulted when the draft code is being prepared; and</txt></block></li></list></block></li><li guid="_64285df6-ea84-4e9f-8844-ffd899856b20" id="sec.159B-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">other information prescribed by regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_56048846-5998-428b-a724-92f1556b16f0" id="sec.159B-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive must publish the schedule—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fe15c22a-64f9-4bb6-b986-4ce7841e4462" id="sec.159B-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">on the department’s website; and</txt></block></li><li guid="_11506b9b-f806-44ef-ae7b-22e391af7d12" id="sec.159B-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">in any other way the chief executive considers appropriate.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_6ed99c3c-fad1-48f7-8867-3c279d1935b7" id="sec.160" provision.type="other" spent.amends="0"><no>160</no><heading guid="_23bd4f30-6859-485a-b591-92ffacadc7e6" id="sec.160-he">Public notice inviting submissions about potential end of waste codes</heading><subclause affected.by.uncommenced="0" guid="_c364ad9f-b12d-47c1-a1db-c70b5a1ab768" id="sec.160-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must, by notice given at least once every year, invite the public to make a submission about whether there is any particular waste for which an end of waste code should be prepared.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b4e0a312-c98c-4343-9c26-4e428d41964a" id="sec.160-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ccd1cb62-f5cf-4de7-bb77-e98cdd2463fb" id="sec.160-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0716d104-9bce-42e3-a369-1b5d08a759c0" id="sec.160-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">that a person may make a submission to the chief executive about any particular waste for which an end of waste code should be prepared; and</txt></block></li><li guid="_06ad553e-ba8f-4410-81b1-1a3b01d3e7ba" id="sec.160-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the period, of at least 28 days, (the <defterm guid="_13ee9495-b609-4e04-a949-a53974acc733" id="sec.160-ssec.2-para1.a-def.submissionperiod" type="definition">submission period</defterm>) during which the submissions may be made; and</txt></block></li><li guid="_1ec9f1ed-8e85-494a-8d5d-a022fc92c5fc" id="sec.160-ssec.2-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">how to make a submission; and</txt></block></li></list></block></li><li guid="_b0648a9c-7105-4323-ad61-270248605915" id="sec.160-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">be published on the department’s website.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a77d5411-1fc0-4720-9a64-2340db44241b" id="sec.160-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A submission made under this section must be in the approved form.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_dcfc42e5-4eed-468d-85bf-1bbbdead74cb" id="sec.161" provision.type="other" spent.amends="0"><no>161</no><heading guid="_4f534452-952e-4b7c-805c-2db27f52a494" id="sec.161-he">Consideration of submissions</heading><block><txt break.before="1">The chief executive must consider all submissions made during the submission period before deciding whether or not to make a draft end of waste code for a particular waste.</txt></block></clause><clause affected.by.uncommenced="0" guid="_24bf7a5d-5448-4b9d-9cf2-1a4e7838b9ac" id="sec.162" provision.type="other" spent.amends="0"><no>162</no><heading guid="_0de21373-249e-4515-b198-070dd9e9a04e" id="sec.162-he">Preparation of end of waste code</heading><subclause affected.by.uncommenced="0" guid="_2b88a5b7-317b-4f31-9e42-369bcc046274" id="sec.162-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0"><intref check="valid" refid="sec.162-ssec.2" target.guid="_6c0b9b7c-7f42-4fa7-a141-cfa1c339f0f7">Subsection (2)</intref> applies if the chief executive decides to prepare a draft end of waste code (the <defterm guid="_fcc3a9d9-648b-4fd2-a49e-58e501dfc13d" id="sec.162-def.draftcode" type="definition">draft code</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6c0b9b7c-7f42-4fa7-a141-cfa1c339f0f7" id="sec.162-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may establish a technical advisory panel under <intref check="valid" refid="sec.173G" target.guid="_8e27f1ef-73d8-4f59-85fb-6008167b9d2f">section 173G</intref> to prepare the draft code.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3840eaed-a2ce-4c2c-ba8b-69ed52289b55" id="sec.162-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the chief executive establishes a technical advisory panel to prepare the draft code—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_891aa071-71aa-43ac-a0a8-45f6c8552833" id="sec.162-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the chief executive may require the panel to include particular requirements in the draft code; and</txt></block></li><li guid="_665a6b0d-b97b-43f9-ba72-43fa78635b4e" id="sec.162-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the panel must prepare and give the chief executive the draft code by the day stated in the schedule.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c07875e9-de81-4f79-9e1f-257182344795" id="sec.162-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, the technical advisory panel may, after having regard to the matters mentioned in <intref check="valid" refid="sec.163" target.guid="_b5f60bcf-67e9-4379-85dd-0dd13d301b97">section 163</intref><intref check="valid" refid="sec.163-ssec.1" target.guid="_ae90b240-b65d-4ed7-a456-6b90daa9e91c">(1)</intref> but within 2 months of being established, recommend to the chief executive that the draft code should not be prepared.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c7492112-06d3-4053-9726-02f2734bbdd9" id="sec.162-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The technical advisory panel’s recommendation under <intref check="valid" refid="sec.162-ssec.4" target.guid="_c07875e9-de81-4f79-9e1f-257182344795">subsection (4)</intref> must be given to the chief executive in writing and include the panel’s reasons for the recommendation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_113f7b71-e21d-49bd-8b70-6d2be51dfd21" id="sec.162-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">If the chief executive does not establish a technical advisory panel to prepare the draft code, the chief executive must prepare the draft code by the day stated in the schedule.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6f69200b-ff29-457b-97c0-190a94fb0f35" id="sec.162-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_f67073ea-5be8-457b-b6dd-f067226ccd64" id="sec.162-ssec.7-def.schedule_"><txt break.before="1"><defterm guid="_545a9309-fff0-42ec-a9e9-a873f2972c37" id="sec.162-ssec.7-def.schedule" type="definition">schedule</defterm> means the schedule published under <intref check="valid" refid="sec.159B" target.guid="_cfae1cbf-381e-4a40-b839-2f4713c95e68">section 159B</intref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b5f60bcf-67e9-4379-85dd-0dd13d301b97" id="sec.163" provision.type="other" spent.amends="0"><no>163</no><heading guid="_0fda5822-b1df-4950-9ed5-fd733365a92b" id="sec.163-he">Matters to be considered in preparing end of waste code</heading><subclause affected.by.uncommenced="0" guid="_ae90b240-b65d-4ed7-a456-6b90daa9e91c" id="sec.163-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">In preparing a draft end of waste code, the chief executive or a technical advisory panel must have regard to the following matters—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a977e969-682b-400a-a19b-86060986e2c3" id="sec.163-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the objects of this Act;</txt></block></li><li guid="_160edb55-fc1a-42f8-b309-915467efe482" id="sec.163-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the proposed use of a particular resource under the proposed end of waste code;</txt></block></li><li guid="_df79ecbb-77db-4170-b4ba-83b5bd9188b8" id="sec.163-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">whether the proposed use of a particular resource may, or is likely to, cause any serious environmental harm or material environmental harm;</txt></block></li><li guid="_62110d99-5879-47ac-971f-7fbf6a79b264" id="sec.163-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the waste and resource management hierarchy;</txt></block></li><li guid="_26d068ac-d71a-4ed1-a188-e7a5a549fe97" id="sec.163-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">any other matter prescribed by regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_bcb81e97-d20e-46a4-9d5b-235e1978ca32" id="sec.163-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">This section does not limit the matters the chief executive or a technical advisory panel may consider in preparing a draft end of waste code.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e1c82f9a-1fcc-493d-8b4a-27941535acff" id="sec.164" provision.type="other" spent.amends="0"><no>164</no><heading guid="_ae0f6700-c782-4b50-addf-ba2c46414266" id="sec.164-he">End of waste code prepared by technical advisory panel</heading><subclause affected.by.uncommenced="0" guid="_e5413c18-f25f-4429-a6eb-2c8f675165af" id="sec.164-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a technical advisory panel prepares a draft end of waste code (the <defterm guid="_6e92a9a7-371a-4e61-9484-6c711e50493e" id="sec.164-def.draftcode" type="definition">draft code</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4a6e34b2-16a3-4007-ad4c-10305fb31387" id="sec.164-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.164-ssec.3" target.guid="_7f60b8fa-7ca5-4256-ab3f-6ff6c17264f2">Subsection (3)</intref> applies if the chief executive is satisfied a technical advisory panel has not—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3ac82245-3830-465c-a2fa-ea8f93b5e7dd" id="sec.164-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">had regard to a matter mentioned in <intref check="valid" refid="sec.163" target.guid="_b5f60bcf-67e9-4379-85dd-0dd13d301b97">section 163</intref>; or</txt></block></li><li guid="_99eb0bbe-cc0b-4562-b91a-72754da5aac4" id="sec.164-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">included a requirement in the draft code that the chief executive required the panel to include in the draft code.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7f60b8fa-7ca5-4256-ab3f-6ff6c17264f2" id="sec.164-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive may—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f903c599-82aa-4029-94ee-97d33a89bf05" id="sec.164-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">ask the technical advisory panel to amend the draft code; or</txt></block></li><li guid="_2050cdf3-1a2f-4458-8025-743bdef5f363" id="sec.164-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">refuse to accept the draft code.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e6014316-5795-4c92-b5e8-b13d124a2566" id="sec.164-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive may amend the draft code before publishing it under <intref check="valid" refid="sec.166" target.guid="_b5034851-59af-4ee1-b24a-f284816a2215">section 166</intref>.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_f63ce2b8-f7b7-4f8d-b9a5-e255558beee8" id="ch.8-pt.2-div.2"><no>Division 2</no><heading guid="_676ff0d1-ed3d-402a-b039-198dd4ea7fd5" id="ch.8-pt.2-div.2-he">Making end of waste codes</heading><clause affected.by.uncommenced="0" guid="_a79791c2-5b5c-4228-9ebd-8b74bdca41ad" id="sec.165" provision.type="other" spent.amends="0"><no>165</no><heading guid="_315cd957-509e-45ae-a6c2-b9c1efae2982" id="sec.165-he">Publication of draft end of waste code</heading><subclause affected.by.uncommenced="0" guid="_27acbfe1-05e0-4828-a402-7dfc5e17652d" id="sec.165-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Before the chief executive decides to make an end of waste code, the chief executive must publish the following on the department’s website—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5c999789-c785-4488-928f-ae4889b494a0" id="sec.165-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a copy of the draft end of waste code; and</txt></block></li><li guid="_e941a7dc-6ffa-4bc9-badc-1f7874f8ad2d" id="sec.165-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a notice stating—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7a1e8407-3a6f-42d7-b625-8e5fa2147148" id="sec.165-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">that a person may make a submission to the chief executive about the draft end of waste code; and</txt></block></li><li guid="_d2d43788-f39b-499f-a3af-dd5ce294399a" id="sec.165-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the period, of at least 28 days (the <defterm guid="_c26a7d11-1c8d-49a6-8667-70102c68b666" id="sec.165-ssec.1-para1.b-def.consultationperiod" type="definition">consultation period</defterm>), during which the submission may be made; and</txt></block></li><li guid="_2d29d111-e669-4405-bf86-d191fc75a2c7" id="sec.165-ssec.1-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">how to make a submission; and</txt></block></li><li guid="_1bad2dae-79c4-407d-bcbd-7f0f9b55aaf2" id="sec.165-ssec.1-para1.b-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">another matter prescribed by regulation.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6b679ab8-0e69-4f9a-b10c-27555eeae5de" id="sec.165-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive must ensure the draft end of waste code and notice continue to be available from the department’s website throughout the consultation period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_adb44e98-b2f6-4170-80b0-a455ca6eb54a" id="sec.165-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive must consider all submissions made under <intref check="valid" refid="sec.165-ssec.1" target.guid="_27acbfe1-05e0-4828-a402-7dfc5e17652d">subsection (1)</intref> before deciding whether or not to make the end of waste code.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b5034851-59af-4ee1-b24a-f284816a2215" id="sec.166" provision.type="other" spent.amends="0"><no>166</no><heading guid="_2d0e9e6a-cf57-42fa-a453-4e9db7b9a67f" id="sec.166-he">Notice of making end of waste code</heading><subclause affected.by.uncommenced="0" guid="_12e1eb7e-b9ef-4e61-91fb-227d327c70ef" id="sec.166-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the chief executive decides to make an end of waste code, the chief executive must notify the making of an end of waste code by gazette notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_26c7203d-9b65-4879-be34-75e7e2256778" id="sec.166-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The gazette notice must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b79a9e89-331d-4378-9af6-7f5d118be6ec" id="sec.166-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the name of the end of waste code; and</txt></block></li><li guid="_7187d9b9-b761-400d-b43d-663a3bc31ab2" id="sec.166-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the date the end of waste code was made; and</txt></block></li><li guid="_0bd1d7c7-4962-4f92-9006-0439e996d5fd" id="sec.166-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">where a copy of the end of waste code may be inspected.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_400cb1aa-b31a-486c-b512-5d34b1696b56" id="sec.166-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The end of waste code takes effect on the later of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_98a2c27c-bcb7-4576-9bfb-6a5c92261f01" id="sec.166-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the day the gazette notice is published;</txt></block></li><li guid="_dc7dbb2e-9941-42da-b181-eacb285d55a3" id="sec.166-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the day stated in the gazette notice for that purpose;</txt></block></li><li guid="_184f5b4e-6ef7-48b5-98f6-d7a16aad2fea" id="sec.166-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the day stated in the end of waste code for that purpose.</txt></block></li></list></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_45c02988-81f1-4fd8-b185-36b50d863ddc" id="ch.8-pt.2-div.3"><no>Division 3</no><heading guid="_c3ff8ab2-d4a0-46dd-a741-b1b5700f382a" id="ch.8-pt.2-div.3-he">Amendment, cancellation or suspension of end of waste codes</heading><clause affected.by.uncommenced="0" guid="_a6d10817-7852-4c86-87b0-8881fae876d1" id="sec.167" provision.type="other" spent.amends="0"><no>167</no><heading guid="_e9c06e0e-cec3-4336-929f-22779cf64b51" id="sec.167-he">Amendment of end of waste code</heading><block><txt break.before="1">The chief executive may, on the chief executive’s own initiative, amend an end of waste code.</txt></block></clause><clause affected.by.uncommenced="0" guid="_f1a658cc-5abe-4fc2-99c3-27ae707d9442" id="sec.168" provision.type="other" spent.amends="0"><no>168</no><heading guid="_ae212f25-5f6e-491d-9042-a703b5820434" id="sec.168-he">Application for amendment of end of waste code</heading><block><txt break.before="1">A person may apply to the chief executive to amend an end of waste code.</txt><note guid="_d2de2433-7be2-4ce9-864e-174c75782ad6" id="sec.168-note" type="example"><heading guid="_bc163802-c6eb-4917-9eae-222e3fd31e89" id="sec.168-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="ch.8A" target.guid="_7c2636c7-59ac-4241-be5c-684e0ad0e559">chapter 8A</intref>, <intref check="valid" refid="ch.8A-pt.2" target.guid="_38a8cf7c-f387-4459-86c3-7f550cc798c5">part 2</intref> for general provisions that apply to the application.</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_b930ac13-1d71-4d5a-923b-f4dbe4232d8c" id="sec.171" provision.type="other" spent.amends="0"><no>171</no><heading guid="_328bdbfa-b07f-4c58-84d7-3d59f68153ff" id="sec.171-he">Cancellation or suspension of end of waste code</heading><block><txt break.before="1">The chief executive may cancel or suspend an end of waste code if the chief executive is satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b628223b-4968-403f-a6ee-71cb5a5fbb70" id="sec.171-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">there is no longer a use for a particular resource under the code; or</txt></block></li><li guid="_f0296524-3ec6-477b-a65f-87839bb04cf0" id="sec.171-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the end of waste code was made on the basis of a miscalculation of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_edccdf90-4fb2-42dd-a5de-176b19a5dae1" id="sec.171-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the characteristics of the resource; and</txt></block></li><li guid="_7266b184-d3bc-43d3-abd5-8e6969599d81" id="sec.171-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the potential of the resource to cause serious environmental harm, or material environmental harm, because of those characteristics; or</txt></block></li></list></block></li><li guid="_aee757ca-de8e-4b68-a3c3-3055d2716305" id="sec.171-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the use of particular waste or a particular resource is unlawful; or</txt></block></li><li guid="_59b6b399-dea1-4a79-a0f4-322b35c8648d" id="sec.171-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">it is necessary or desirable to do so having regard to the objects of the <legref check="valid" jurisd="QLD" target.doc.id="act-2011-031" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" type="act">Act</legref>.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_3857ca57-bff6-4abf-a3bd-31bf20369dec" id="sec.172" provision.type="other" spent.amends="0"><no>172</no><heading guid="_a41b0909-8409-491e-9a8b-d2946fbb6a5a" id="sec.172-he">Procedure for amending, cancelling or suspending end of waste code</heading><subclause affected.by.uncommenced="0" guid="_af70a510-b6e6-4cde-945a-f8f197147091" id="sec.172-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the chief executive proposes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_768c13e3-d726-4528-b85b-b449b66b6dd9" id="sec.172-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to amend an end of waste code; or</txt></block></li><li guid="_20f8bc06-adfd-487a-a7d3-e7cef7d29e62" id="sec.172-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to cancel or suspend an end of waste code.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c2bb4ea0-b5ab-4575-95e9-a22dc57a1f23" id="sec.172-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_16afabf9-86ad-438c-a09c-96c11995fbb5" id="sec.172-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">give notice of the proposed action to each registered resource producer for the end of waste code; and</txt></block></li><li guid="_c568419a-aaae-4c55-9d2a-29809a21cdc9" id="sec.172-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">publish a notice of the proposed action—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d915a180-0d58-4ab0-9e8e-7157bedc59ec" id="sec.172-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">on the department’s website; and</txt></block></li><li guid="_58f3d0a5-a744-4b65-8640-6cd21a96e334" id="sec.172-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">in any other way the chief executive considers appropriate.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c54f386e-eb40-4c51-9692-d7989d92ebef" id="sec.172-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A notice under <intref check="valid" refid="sec.172-ssec.2" target.guid="_c2bb4ea0-b5ab-4575-95e9-a22dc57a1f23">subsection (2)</intref> must state the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b1394ce1-7b50-4fca-9430-431e1991d0ca" id="sec.172-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the action the chief executive proposes to take;</txt></block></li><li guid="_575b7336-f98b-4d79-a797-e0457cf4c04d" id="sec.172-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the proposed action is an amendment of an end of waste code—the proposed amendment;</txt></block></li><li guid="_c69ecb9a-44d4-4730-b36b-5aa58719fe8c" id="sec.172-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the proposed action is suspension—the proposed period of the suspension;</txt></block></li><li guid="_c068a5e0-8d23-446a-bab9-76890b098ffa" id="sec.172-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the reasons for the proposed action;</txt></block></li><li guid="_2a045c00-8f0f-4de9-acee-c0f50181b18f" id="sec.172-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the facts and circumstances that form the basis for the reasons;</txt></block></li><li guid="_03ee3488-dcca-4397-92fb-919e58dcb524" id="sec.172-ssec.3-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">for a notice given to a registered resource producer—that the registered resource producer may, within a stated period, make a written submission to the chief executive about the proposed action;</txt></block></li><li guid="_eaa416fb-89ca-41ff-baf0-b7f483bb86f2" id="sec.172-ssec.3-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">for a notice published under <intref check="valid" refid="sec.172-ssec.2" target.guid="_c2bb4ea0-b5ab-4575-95e9-a22dc57a1f23">subsection (2)</intref><intref check="valid" refid="sec.172-ssec.2-para1.b" target.guid="_c568419a-aaae-4c55-9d2a-29809a21cdc9">(b)</intref>—that any person may, within a stated period, make a written submission to the chief executive about the proposed action.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e87ef306-1d12-456d-b77f-706442e845ba" id="sec.172-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The stated period must not end before 28 days after whichever of the following happens last—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_176a4047-63c4-445b-8d94-1ceeb4bc7d7a" id="sec.172-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the day the notice is given to the registered resource producer under <intref check="valid" refid="sec.172-ssec.2" target.guid="_c2bb4ea0-b5ab-4575-95e9-a22dc57a1f23">subsection (2)</intref><intref check="valid" refid="sec.172-ssec.2-para1.a" target.guid="_16afabf9-86ad-438c-a09c-96c11995fbb5">(a)</intref>;</txt></block></li><li guid="_e9e0ff59-4ef6-434e-9cd7-dbfac0ac6616" id="sec.172-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the day the notice is published under <intref check="valid" refid="sec.172-ssec.2" target.guid="_c2bb4ea0-b5ab-4575-95e9-a22dc57a1f23">subsection (2)</intref><intref check="valid" refid="sec.172-ssec.2-para1.b" target.guid="_c568419a-aaae-4c55-9d2a-29809a21cdc9">(b)</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_dea1cdf2-f5a3-4192-84e3-87c06bab22c3" id="sec.172-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The chief executive may decide whether or not to take the proposed action after considering—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9c789c84-716e-4ada-9de4-842d96b12a35" id="sec.172-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">all submissions made under <intref check="valid" refid="sec.172-ssec.3" target.guid="_c54f386e-eb40-4c51-9692-d7989d92ebef">subsection (3)</intref> within the stated period; and</txt></block></li><li guid="_10bb499a-4fd7-4d2e-ac33-25d214e711fe" id="sec.172-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the proposed action is an amendment of an end of waste code—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_107d5529-30f2-4aa3-b936-acbd13f4dd1d" id="sec.172-ssec.5-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the effect of the amendment on the use of a particular resource; and</txt></block></li><li guid="_792f3d70-d78c-4790-975d-ea056f7f2ca0" id="sec.172-ssec.5-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">whether the effect of the amendment on the use of a particular resource is likely to cause any serious environmental harm or material environmental harm; and</txt></block></li><li guid="_53421bda-837e-4752-96a4-dcd11af52e51" id="sec.172-ssec.5-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the waste and resource management hierarchy; and</txt></block></li><li guid="_7a5f1f82-4316-43f9-90a2-fc487f4b99d1" id="sec.172-ssec.5-para1.b-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">any advice, information or comment provided by any technical advisory panel; and</txt></block></li></list></block></li><li guid="_ad796070-1bb3-4181-99e2-bfaf26821707" id="sec.172-ssec.5-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">another matter prescribed by regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ab755903-7563-4476-b98e-faae1dc151a9" id="sec.172-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">Within 10 business days after making a decision, the chief executive must give each registered resource producer for the end of waste code—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_56ad6147-806c-46f6-aeca-717657e4f957" id="sec.172-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the decision is to take the proposed action—an information notice for the decision; or</txt></block></li><li guid="_4fdac3ed-177b-4688-aae6-278f7af37bec" id="sec.172-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the decision is not to take the proposed action—a notice stating the decision.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f7fbd4f0-b7b8-4d30-99ec-4b21af332fb4" id="sec.172-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">A decision to take the proposed action takes effect for a registered resource producer on the later of the following days—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b6d3156b-5ad9-4a57-871f-07530199b34c" id="sec.172-ssec.7-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the day the information notice is given to the registered resource producer;</txt></block></li><li guid="_cfcb2d23-8423-48cc-9fbc-7c14cc391bd4" id="sec.172-ssec.7-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a later day stated in the information notice for that purpose.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_87342b1f-81b7-423c-9d6b-082b75fa0abb" id="sec.173" provision.type="other" spent.amends="0"><no>173</no><heading guid="_979c632d-fafa-48f2-ac81-01f71834d7e1" id="sec.173-he">Publication and notification of amended end of waste code</heading><subclause affected.by.uncommenced="0" guid="_de7ad9ba-7ae4-47c9-9edc-64a95e2bd7ec" id="sec.173-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the chief executive amends an end of waste code under <intref check="valid" refid="sec.172" target.guid="_3857ca57-bff6-4abf-a3bd-31bf20369dec">section 172</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b2fa46b6-66b5-4d7f-8790-2f79247c0a4a" id="sec.173-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_46aa2c9a-a6a5-4ebd-b635-d8c2c05e35ed" id="sec.173-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">publish a copy of the amended end of waste code—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5fbf49f6-2b67-4999-be80-d9aec764fd56" id="sec.173-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">on the department’s website; and</txt></block></li><li guid="_3d25e363-425f-406a-97b8-e861b4e0f9e0" id="sec.173-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">in any other way the chief executive considers appropriate; and</txt></block></li></list></block></li><li guid="_63b1ee34-adbf-4fd6-97a1-8ffb3f0b146e" id="sec.173-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">notify the amendment of the end of waste code by gazette notice.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8ec9722d-4d21-45d8-bbdb-5ff8840dde09" id="sec.173-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The gazette notice must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7183610f-a421-46da-a250-9fc0139bbf5e" id="sec.173-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the name of the end of waste code; and</txt></block></li><li guid="_1bafa2c5-4061-45b2-9af4-020226c8ecad" id="sec.173-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the date the end of waste code was amended; and</txt></block></li><li guid="_82c9d00d-9945-49d0-98df-926871388ccb" id="sec.173-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">where a copy of the amended end of waste code may be inspected.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b8cffbfc-0f3b-4358-976d-5b574ebc831a" id="sec.173-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The amended end of waste code takes effect on the later of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b9611428-f429-4397-9ac5-e5e24ff71233" id="sec.173-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the day the gazette notice is published;</txt></block></li><li guid="_5df03cb7-ef73-421a-a7f1-4f338510da14" id="sec.173-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the day stated in the gazette notice;</txt></block></li><li guid="_ebde1590-f315-49d9-b4bc-931864b76572" id="sec.173-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the day stated in the amended end of waste code.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_bd36f1c9-2082-4143-947c-f326f5e07c6f" id="sec.173A" provision.type="other" spent.amends="0"><no>173A</no><heading guid="_da9c40a5-930a-4323-bb4e-dc946efa8295" id="sec.173A-he">Minor amendment of end of waste code</heading><subclause affected.by.uncommenced="0" guid="_03cf1d49-1fbc-475b-8fb0-c2ecfbf88b4f" id="sec.173A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may make a minor amendment of an end of waste code by publishing a notice of the amendment—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_eec3fd13-53ab-4e47-a0e1-a41400ea5102" id="sec.173A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">on the department’s website; and</txt></block></li><li guid="_898412ea-7aab-4715-8dcd-2e83612c8276" id="sec.173A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">in any other way the chief executive considers appropriate.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0c9838cd-089f-427e-8a58-a70992128d9a" id="sec.173A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may make the minor amendment to the end of waste code—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_85884ef9-1d31-4e32-aa5b-0a86a2a048c6" id="sec.173A-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">on the chief executive’s own initiative; or</txt></block></li><li guid="_a233187b-7708-4d95-a933-ae18d5448206" id="sec.173A-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">on an application made under <intref check="valid" refid="sec.168" target.guid="_f1a658cc-5abe-4fc2-99c3-27ae707d9442">section 168</intref> for a minor amendment of an end of waste code.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6c9781fd-9aa0-4efc-a401-00e91491a808" id="sec.173A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">This section applies despite <intref check="valid" refid="sec.172" target.guid="_3857ca57-bff6-4abf-a3bd-31bf20369dec">section 172</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_10c1e0c6-b043-4012-9340-9e2909beb9c9" id="sec.173A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_05c0d548-f757-4bed-92ba-ba15c13c5c11" id="sec.173A-ssec.4-def.minoramendment_"><txt break.before="1"><defterm guid="_268538cf-1504-4805-ad9f-c4715d18e94e" id="sec.173A-ssec.4-def.minoramendment" type="definition">minor amendment</defterm>, of an end of waste code, means an amendment of the code—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_df975a65-96a4-4ee9-8757-6594b30d1210" id="sec.173A-ssec.4-def.minoramendment-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to correct a minor or formal error in the code; or</txt></block></li><li guid="_8d79e404-7912-47dc-9f91-1b03bfd9f37d" id="sec.173A-ssec.4-def.minoramendment-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to make another change that is not a change of substance and does not adversely affect the interests of a registered resource producer or a person who is likely to receive a resource from the registered resource producer.</txt></block></li></list></definition></deflist></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_b368f0dc-b636-42f1-9d8b-d2b6be807144" id="ch.8-pt.2-div.4"><no>Division 4</no><heading guid="_55df98b9-8144-4828-b896-1e0da2c2237b" id="ch.8-pt.2-div.4-he">Registration of end of waste resource producers</heading><clause affected.by.uncommenced="0" guid="_5a00b3e0-146d-4629-ac53-5c743b7ba338" id="sec.173B" provision.type="other" spent.amends="0"><no>173B</no><heading guid="_18d8d0fd-a1a5-44d9-adf4-a184f9a93a9f" id="sec.173B-he">Registration of end of waste resource producers</heading><subclause affected.by.uncommenced="0" guid="_fb2a4058-2a98-47ed-b0f6-28cf3b8cb3c5" id="sec.173B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person becomes a registered resource producer for an end of waste code by giving the chief executive a notice that the person intends to become a registered resource producer for the code.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_413e5a79-1037-4ea3-82bb-832d20b65858" id="sec.173B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f23fffc3-f521-480c-898b-e05e9aedd5f4" id="sec.173B-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li guid="_41c07f0c-80b4-4ca9-b7e5-533598dd5aa8" id="sec.173B-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">include the information prescribed by regulation; and</txt></block></li><li guid="_6e87180f-820a-43f7-be87-8ee753c6979a" id="sec.173B-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">be accompanied by the fee prescribed by regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6e921c36-b976-41a6-8d04-d730c12b4ee5" id="sec.173B-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A person stops being a registered resource producer for an end of waste code by giving the chief executive a notice in the approved form.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7542041b-dd95-4162-bc31-50593775ede2" id="sec.173C" provision.type="other" spent.amends="0"><no>173C</no><heading guid="_9a312118-af0d-4f25-a246-34b0c4cf17df" id="sec.173C-he">Cancellation or suspension of registration</heading><subclause affected.by.uncommenced="0" guid="_87d8eded-9002-4f66-b0a9-8cf6dbf7d600" id="sec.173C-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may cancel or suspend a registered resource producer’s registration if the chief executive reasonably believes the registered resource producer has failed to comply with a requirement of an end of waste code.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6aadd2a1-3eed-4246-9865-b1a4a8ff87de" id="sec.173C-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may act under <intref check="valid" refid="sec.173C-ssec.1" target.guid="_87d8eded-9002-4f66-b0a9-8cf6dbf7d600">subsection (1)</intref> regardless of whether the chief executive has given the registered resource producer a show cause notice under <intref check="valid" refid="ch.11" target.guid="_e6645484-8c0c-4512-9bf9-7a0ca2fe74f1">chapter 11</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_bce40ab2-c705-4881-9ab2-752c0fa8afc9" id="sec.173D" provision.type="other" spent.amends="0"><no>173D</no><heading guid="_bc4cba3d-e00d-43f6-9e16-1955877f5458" id="sec.173D-he">Procedure for cancelling or suspending registration</heading><subclause affected.by.uncommenced="0" guid="_76bb45be-539e-4e2a-b490-9305f8e22d14" id="sec.173D-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Before cancelling or suspending a registered resource producer’s registration under <intref check="valid" refid="sec.173C" target.guid="_7542041b-dd95-4162-bc31-50593775ede2">section 173C</intref>, the chief executive must give the person a notice stating the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_55a02aed-a6d3-4cdc-b18f-250ba5ce3ef3" id="sec.173D-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the action the chief executive proposes to take;</txt></block></li><li guid="_1a97ba4a-e05f-4eec-bc62-7bf32e205443" id="sec.173D-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the proposed action is suspension—the period of the suspension;</txt></block></li><li guid="_82f64d46-9c50-470d-b00e-7f8058423cb4" id="sec.173D-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the reasons for the proposed action;</txt></block></li><li guid="_a1b3cd40-1c5a-4463-8ebd-03db092863ad" id="sec.173D-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the facts and circumstances that form the basis for the reasons;</txt></block></li><li guid="_87b252d0-3d3a-4910-8cad-dcc6009e6b73" id="sec.173D-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">that the person may, within a stated period, make a written submission to the chief executive about why the proposed action should not be taken.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_021498f3-a7a4-481e-9311-539557b870df" id="sec.173D-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.173D-ssec.1" target.guid="_76bb45be-539e-4e2a-b490-9305f8e22d14">subsection (1)</intref><intref check="valid" refid="sec.173D-ssec.1-para1.e" target.guid="_87b252d0-3d3a-4910-8cad-dcc6009e6b73">(e)</intref>, the stated period must not end less than 28 days after the registered resource producer is given the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_417fcdd2-1246-4c1e-880c-7e1ea0c79e97" id="sec.173D-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive must consider any submissions made under <intref check="valid" refid="sec.173D-ssec.1" target.guid="_76bb45be-539e-4e2a-b490-9305f8e22d14">subsection (1)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_94b0aafe-11d2-4d0f-b0d6-2f75826e3b36" id="sec.173D-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Within 5 business days after deciding whether or not to take the proposed action, the chief executive must give the registered resource producer—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cbcddb7c-479c-4dc7-9f6e-b7745e4c2093" id="sec.173D-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the decision is to take the proposed action—an information notice for the decision; or</txt></block></li><li guid="_dfa02c06-703c-4e3c-89aa-35f1b96b2ce3" id="sec.173D-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the decision is not to take the proposed action—a notice stating the decision.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_fa3c3d5b-0f0d-49ab-99d7-24a29af424f0" id="sec.173D-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">A decision to take the proposed action takes effect the day the information notice is given to the registered resource producer.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8d5211f4-3b31-4b5f-91c0-2613d8a76169" id="sec.173E" provision.type="other" spent.amends="0"><no>173E</no><heading guid="_7db51e0b-31ad-421a-b9fc-0067f931d245" id="sec.173E-he">Particular circumstances when end of waste approval lapses</heading><subclause affected.by.uncommenced="0" guid="_e784b213-3f28-4301-b72e-4bda80d1c4e9" id="sec.173E-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the holder of an end of waste approval relating to a particular waste becomes a registered resource producer for an end of waste code for the same waste.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3cad6652-3833-47fd-84eb-a033d07cc363" id="sec.173E-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The person’s end of waste approval lapses.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3ad78a34-6c6b-450c-940f-f244e20ce19e" id="sec.173F" provision.type="other" spent.amends="0"><no>173F</no><heading guid="_7de60907-5761-4a88-a48a-68ff723adf76" id="sec.173F-he">Register of registered resource producers</heading><subclause affected.by.uncommenced="0" guid="_f0fa7bb5-38c9-464a-b9b1-8bbaff64bc8f" id="sec.173F-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must maintain a register of registered resource producers for each end of waste code.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_58ca365e-3e07-4a20-b25f-ae3cedba5a9a" id="sec.173F-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The register may be kept in electronic form.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1b07bad9-6b3b-48a7-92e8-26a960e3ed13" id="sec.173F-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive may publish information from the register in a way the chief executive considers appropriate.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_cc890e0c-1e10-4f34-b1ab-7288a0af4f90" id="sec.173F-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, the chief executive must not publish confidential information included in the register.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_92bd1d7a-84b6-4481-b424-404a40286f58" id="sec.173F-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_8c260794-6b5a-449d-ab74-df9b3d87c2b1" id="sec.173F-ssec.5-def.confidentialinformation_"><txt break.before="1"><defterm guid="_4ea5d973-cab9-43ff-972a-9585605152b1" id="sec.173F-ssec.5-def.confidentialinformation" type="definition">confidential information</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2a9f4fe5-0161-4029-82b3-dac23d015ab3" id="sec.173F-ssec.5-def.confidentialinformation-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">means information that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1ae74715-b468-4ff0-bbcf-5d9c6c5dc129" id="sec.173F-ssec.5-def.confidentialinformation-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">could identify an individual; or</txt></block></li><li guid="_c2eab417-31ee-418d-b503-8cedcf47ba33" id="sec.173F-ssec.5-def.confidentialinformation-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">is about a person’s current financial position or financial background; or</txt></block></li><li guid="_ababc921-715b-45b0-9893-43d2486bfe52" id="sec.173F-ssec.5-def.confidentialinformation-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">would be likely to damage the commercial activities of a person to whom the information relates; but</txt></block></li></list></block></li><li guid="_a54810b7-ae6f-4a9f-8f0e-4e17afc96e02" id="sec.173F-ssec.5-def.confidentialinformation-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">does not include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0a7fbb4c-a1cf-489a-8d25-2668fe84febf" id="sec.173F-ssec.5-def.confidentialinformation-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">information that is publicly available; or</txt></block></li><li guid="_fec219b8-4495-41e7-b52d-0e9d670fdc0b" id="sec.173F-ssec.5-def.confidentialinformation-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">statistical or other information that could not reasonably be expected to identify an individual to whom it relates.</txt></block></li></list></block></li></list></definition></deflist></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_bcd43d75-3acd-4db7-afbc-67d4d14f8392" id="ch.8-pt.2-div.5"><no>Division 5</no><heading guid="_e974fbb1-bf49-496c-9f91-e15222b35f78" id="ch.8-pt.2-div.5-he">Miscellaneous</heading><clause affected.by.uncommenced="0" guid="_8e27f1ef-73d8-4f59-85fb-6008167b9d2f" id="sec.173G" provision.type="other" spent.amends="0"><no>173G</no><heading guid="_befd0838-cda4-4065-b191-67e92cd5ca67" id="sec.173G-he">Technical advisory panels</heading><subclause affected.by.uncommenced="0" guid="_73a14740-e011-4e3b-9312-c5b6b08e78b2" id="sec.173G-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may establish a panel (a <defterm guid="_a270261a-0587-4f46-8739-c1f21628694e" id="sec.173G-def.technicaladvisorypanel" type="definition">technical advisory panel</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5600e8ff-538f-4b28-a2e5-eadb00958015" id="sec.173G-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_21975120-3988-4e0d-a28f-88ccafb46649" id="sec.173G-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">consider matters relating to the development of a draft end of waste code; and</txt></block></li><li guid="_8fcb4970-742c-4587-a864-0b08acb4d479" id="sec.173G-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if necessary, prepare a draft end of waste code; or</txt></block></li></list></block></li><li guid="_ff3af36c-4ac8-4d8b-860a-f3f8c376e07f" id="sec.173G-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to consider and provide advice, information or comment about—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7146c63b-52fc-4e1e-8ba0-a55f3de8dffb" id="sec.173G-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a draft end of waste code prepared by the chief executive; or</txt></block></li><li guid="_096dc187-d6c9-401a-8a1d-524173cf08fc" id="sec.173G-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">an amendment of an end of waste code.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1ae07c37-528c-42c8-b6d5-f860d41fc997" id="sec.173G-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A regulation may prescribe matters for a technical advisory panel, including, but not limited to, the following matters—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_43d755f2-0c47-4546-9f82-80d8ce34f572" id="sec.173G-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the terms of reference for the panel;</txt></block></li><li guid="_528404e8-0d88-454c-8646-18699671a1e8" id="sec.173G-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the appointment of members of the panel;</txt></block></li><li guid="_87648d25-5c4f-4781-b1bc-479599b9bdd1" id="sec.173G-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the composition of the panel membership;</txt></block></li><li guid="_d67a5791-068d-475c-a661-be5dd3abf624" id="sec.173G-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the resignation of members of the panel;</txt></block></li><li guid="_71ed3079-2dff-4a6f-ad45-c137d0811faa" id="sec.173G-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the disclosure of interests of members of the panel;</txt></block></li><li guid="_36677434-8eda-4637-8c0a-5b50783fb8a0" id="sec.173G-ssec.2-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">the termination of appointment of members of the panel.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3deb632d-537c-4f89-924a-88d6f65648a4" id="sec.173H" provision.type="other" spent.amends="0"><no>173H</no><heading guid="_fbc552db-c604-4275-a2ce-87831a92da77" id="sec.173H-he">Chief executive may seek advice, comment or information about <intref check="valid" refid="ch.8-pt.2" target.guid="_920ec791-c4bc-4602-bbd8-ecc394288b37">pt 2</intref></heading><subclause affected.by.uncommenced="0" guid="_3f89fa46-4b1f-4c43-a723-dd5316c8c2cd" id="sec.173H-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may ask any entity for advice, comment or information about the operation of this part, including, for example, the operation of an end of waste code.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ecb5fd85-ebfa-440b-9be5-b2c2ce1a6d01" id="sec.173H-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">There is no particular way advice, comment or information must be asked for and received and the request may be by public notice.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_b318dbae-1ab4-40ae-b90d-2edf52e8defa" id="ch.8-pt.3"><no>Part 3</no><heading guid="_276bb804-2cbc-4b82-b949-74ab683e3f5b" id="ch.8-pt.3-he">End of waste approvals</heading><clause affected.by.uncommenced="0" guid="_ba717b9b-c4e8-40b8-a2fb-6046ddbced1f" id="sec.173I" provision.type="other" spent.amends="0"><no>173I </no><heading guid="_2572da24-eee9-4282-ad17-0b346f4358b8" id="sec.173I-he">Application</heading><subclause affected.by.uncommenced="0" guid="_f3ef244c-f13b-4d8e-bace-75aad730b14c" id="sec.173I-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person may apply to the chief executive for an end of waste approval to conduct a trial for 1 kind of waste to demonstrate whether or not the waste is suitable to be used as a resource.</txt><note guid="_e1bf3b47-3e58-46c5-ab61-1e2e66665ada" id="sec.173I-ssec.1-note" type="example"><heading guid="_14e47441-fe38-42ca-833c-a9f2ef29f6ce" id="sec.173I-ssec.1-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="ch.8A" target.guid="_7c2636c7-59ac-4241-be5c-684e0ad0e559">chapter 8A</intref> for general provisions that apply to the application and to an end of waste approval.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_e40c345a-6606-4d79-8b4b-fb9da385e23e" id="sec.173I-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application must be accompanied by a written report about the application, in the approved form, prepared by a suitably qualified person.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_57c5c852-75da-4946-a72e-8fedae83eca2" id="sec.173I-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A regulation may prescribe matters about preparing a written report.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_45fe97d8-98e4-4e5a-a459-b76c97ec3c8a" id="sec.173I-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_e6897144-b0a7-476d-b358-e69e4e5a16b0" id="sec.173I-ssec.4-def.suitablyqualifiedperson_"><txt break.before="1"><defterm guid="_426fd222-c6dd-4a5e-b98f-c7b83c5eed91" id="sec.173I-ssec.4-def.suitablyqualifiedperson" type="definition">suitably qualified person</defterm>, in relation to a written report, means a person who—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a10c0a12-60ba-4fd4-9715-dffdfb27985f" id="sec.173I-ssec.4-def.suitablyqualifiedperson-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">has the qualifications and experience appropriate for preparing the report; and</txt></block></li><li guid="_7cfcc7b8-da93-414e-8718-99738ea224c6" id="sec.173I-ssec.4-def.suitablyqualifiedperson-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">meets any other criteria prescribed by regulation.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_dd83cdf1-2877-4a39-9ea4-7a97fd05ca25" id="sec.173J" provision.type="other" spent.amends="0"><no>173J </no><heading guid="_06af24cc-913a-4d7f-8a04-dc031e569a59" id="sec.173J-he">Particular matters for making decision</heading><subclause affected.by.uncommenced="0" guid="_457fb3a0-c437-4d78-a570-c20206ca51c0" id="sec.173J-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">In deciding whether to grant the end of waste approval, the chief executive must consider whether—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_650e4d57-1198-4990-8bca-7e727c503faf" id="sec.173J-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the proposed management of the particular waste or the use of a particular resource is likely to cause any serious environmental harm, material environmental harm or environmental nuisance; and</txt></block></li><li guid="_1b9e198b-1b76-480e-8d0f-21c6a69b4ef2" id="sec.173J-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">it is reasonably practicable for an end of waste code to be made for the particular waste the subject of the application.</txt></block></li></list><note guid="_c8a26962-126a-48a6-9009-5a5b4a8aa5eb" id="sec.173J-ssec.1-note" type="example"><heading guid="_7c9fa76c-fdf0-4185-92f7-aa712afe6b6c" id="sec.173J-ssec.1-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="sec.173V" target.guid="_b182f461-3f03-4099-85a6-2cc35af8bb9a">section 173V</intref> for the general criteria that apply for deciding the application.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_cf9302c6-2043-46e4-ae47-e863f458d041" id="sec.173J-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The period for deciding the application is 40 business days and the period may be extended for 20 business days.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e2ae96a4-902d-4a7a-b781-1922e354c136" id="sec.173J-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the chief executive decides to grant the end of waste approval, the notice given to the applicant under <intref check="valid" refid="sec.173W" target.guid="_0630101b-b84d-42e1-b68b-7740561f0928">section 173W</intref> must state the particular waste to which the approval relates.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c36de416-fa8f-4e20-bd01-066635122f5b" id="sec.173K" provision.type="other" spent.amends="0"><no>173K </no><heading guid="_634bcfc3-b17c-42b2-a945-778b250681cd" id="sec.173K-he">Conditions of end of waste approval</heading><subclause affected.by.uncommenced="0" guid="_7246dbce-b32a-4833-b625-cf05b76ad703" id="sec.173K-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A condition imposed on an end of waste approval under <intref check="valid" refid="sec.173X" target.guid="_f06fadca-f26b-481a-a66b-fc99e9cc1aee">section 173X</intref> may impose an obligation on—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_97e7bc15-8554-48e8-a193-c81759e25d2d" id="sec.173K-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the holder of the approval; or</txt></block></li><li guid="_defd23ce-218d-46a5-bea2-2f554719f623" id="sec.173K-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a resource user of a resource under the approval.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_dbd5cf41-db62-44d8-8caa-22104b1ad697" id="sec.173K-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The holder of, or a resource user or other person acting under, an end of waste approval must comply with the conditions of the approval.</txt><penalty guid="_60617d25-bd21-455d-9f02-cf15e1ec66ef" id="sec.173K-ssec.2-pen"><block><txt break.before="1">Maximum penalty—1,665 penalty units.</txt></block></penalty><note guid="_fc07e671-f4c7-456d-b8db-fe8070734f32" id="sec.173K-ssec.2-note" type="example"><heading guid="_89ec49de-b313-4818-8f9b-760aebfd0f51" id="sec.173K-ssec.2-note-he">Note for <intref check="valid" refid="sec.173K-ssec.2" target.guid="_dbd5cf41-db62-44d8-8caa-22104b1ad697">subsection (2)</intref>—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.268" target.guid="_50bb8430-47e8-4c4a-bf17-3c946855ae54">section 268</intref>, to have also committed the offence.</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_6d575674-8f66-4ce0-a6eb-bd18d4bd35d5" id="sec.173L" provision.type="other" spent.amends="0"><no>173L </no><heading guid="_e6e344f2-b60c-41f9-994b-f27d859a6f9a" id="sec.173L-he">Extending end of waste approval</heading><subclause affected.by.uncommenced="0" guid="_4bc1e102-b36c-4025-a611-bb33bfa8ddd5" id="sec.173L-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The holder of an end of waste approval may apply to the chief executive, on 1 occasion, to extend the approval.</txt><note guid="_c36ee465-4302-47cf-abe1-d7a3e0266da7" id="sec.173L-ssec.1-note" type="example"><heading guid="_4e2104ef-8aae-460f-8a5c-e2c762a84b76" id="sec.173L-ssec.1-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="ch.8A" target.guid="_7c2636c7-59ac-4241-be5c-684e0ad0e559">chapter 8A</intref>, <intref check="valid" refid="ch.8A-pt.2" target.guid="_38a8cf7c-f387-4459-86c3-7f550cc798c5">part 2</intref> for general provisions that apply to the application.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_e301a124-7385-4da5-b9b8-a27d9873497d" id="sec.173L-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application must be made at least 2 months before the end of waste approval expires.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6b4a6638-5a44-4b8f-a888-be90425c1e5a" id="sec.173L-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In deciding the application, the chief executive must consider—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_319a26c3-5a24-44be-888b-3f7bc48746e8" id="sec.173L-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the matters mentioned in <intref check="valid" refid="sec.173J" target.guid="_dd83cdf1-2877-4a39-9ea4-7a97fd05ca25">section 173J</intref><intref check="valid" refid="sec.173J-ssec.1" target.guid="_457fb3a0-c437-4d78-a570-c20206ca51c0">(1)</intref>; and</txt></block></li><li guid="_dfc749d2-49ec-4d83-bc37-ec05296549d8" id="sec.173L-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether the waste and resource to which the approval relates would be more appropriately managed as a waste management ERA.</txt></block></li></list><note guid="_aa2b5d75-9397-44b3-9ff2-afd5d1a5841c" id="sec.173L-ssec.3-note" type="example"><heading guid="_f6033e2b-222a-4a7c-9c92-7d19aff12020" id="sec.173L-ssec.3-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="sec.173V" target.guid="_b182f461-3f03-4099-85a6-2cc35af8bb9a">section 173V</intref> for the general criteria that apply for deciding the application.</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_9a5e6125-cae7-40d5-8e57-fed3656d5ee7" id="sec.173M" provision.type="other" spent.amends="0"><no>173M </no><heading guid="_47d3ee1f-5f94-4562-a321-8de8fe789803" id="sec.173M-he">Applying to amend end of waste approval</heading><subclause affected.by.uncommenced="0" guid="_f97ea79f-9c45-47c2-bba9-8cbd1cd558b9" id="sec.173M-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The holder of an end of waste approval may apply to the chief executive to amend the approval (an <defterm guid="_8e60376f-e7f8-45c0-ace8-7bd1d6b8b818" id="sec.173M-def.amendmentapplication" type="definition">amendment application</defterm>).</txt><note guid="_3ed76751-694e-4ed8-a16c-993de542fba2" id="sec.173M-ssec.1-note" type="example"><heading guid="_67031f63-27f7-4d0e-96d9-538f3587b712" id="sec.173M-ssec.1-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="ch.8A" target.guid="_7c2636c7-59ac-4241-be5c-684e0ad0e559">chapter 8A</intref>, <intref check="valid" refid="ch.8A-pt.2" target.guid="_38a8cf7c-f387-4459-86c3-7f550cc798c5">part 2</intref> for general provisions that apply to the application.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_81b82d93-1c87-44e0-ba1d-2a2154f6a578" id="sec.173M-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application must be accompanied by a written report about the application, in the approved form, prepared by a suitably qualified person.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3f65d414-0150-4715-bd75-37c8f10678da" id="sec.173M-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A regulation may prescribe matters about preparing a written report.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_14bdd209-df55-48f4-8f59-d0612cd470a6" id="sec.173M-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The period for deciding the application is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_683d5ded-26de-47ad-8b2c-d9cdddee60e4" id="sec.173M-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the application is for a minor amendment of the approval—10 business days; or</txt></block></li><li guid="_4dc425f7-692e-4011-90cc-280e6484008a" id="sec.173M-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—40 business days.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_05f5da18-ca95-4c44-94dd-f55e04310dfb" id="sec.173M-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_f5e1c47f-798d-4a1a-bd18-85a1b92d05bc" id="sec.173M-ssec.5-def.environmentalharm_"><txt break.before="1"><defterm guid="_85140b4e-ea04-4451-a539-72833bc56a25" id="sec.173M-ssec.5-def.environmentalharm" type="definition">environmental harm</defterm> see the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Environmental Protection Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.14" target.doc.id="act-1994-062" target.guid="_df0d3b10-615a-465f-9abe-332da031872b" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act">section 14</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_ffb5b91d-1f72-4f2e-97e9-e0359ba2974a" id="sec.173M-ssec.5-def.minoramendment_"><txt break.before="1"><defterm guid="_1afcca9f-bd1a-4769-8eb2-b649cc11daf7" id="sec.173M-ssec.5-def.minoramendment" type="definition">minor amendment</defterm>, of an approval, means an amendment of the approval—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b1cb99c3-8610-40b3-bdf7-9a1f7d52fdcf" id="sec.173M-ssec.5-def.minoramendment-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to correct a minor or formal error in the approval; or</txt></block></li><li guid="_31610bf5-18cf-4001-bd65-59197811ad43" id="sec.173M-ssec.5-def.minoramendment-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to make a change that is not a change of substance and does not—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_71e7f704-bbc3-4659-9d96-72b82d8bd4d6" id="sec.173M-ssec.5-def.minoramendment-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">relate to the characteristics of the resource, including, for example, the physical, chemical or biological properties of the resource; or</txt></block></li><li guid="_19d6b993-1c28-4d5e-9616-1db0498a315c" id="sec.173M-ssec.5-def.minoramendment-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">relate to the use of the resource; or</txt></block></li><li guid="_eef86831-6cd3-4a29-bfc3-a325bb27e2b1" id="sec.173M-ssec.5-def.minoramendment-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">significantly increase any environmental harm caused by the use of the resource; or</txt></block></li><li guid="_e2293ed9-2a3b-4f2d-b466-889ff874068c" id="sec.173M-ssec.5-def.minoramendment-para1.b-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">adversely affect the interests of the holder of the approval or another person; or</txt></block></li></list></block></li><li guid="_9d7d6313-f20c-4792-95f9-dfc0154b401d" id="sec.173M-ssec.5-def.minoramendment-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">of a type prescribed by regulation.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_2bc90967-f1f0-4932-90c2-04103bdf2198" id="sec.173M-ssec.5-def.suitablyqualifiedperson_"><txt break.before="1"><defterm guid="_3c8f516c-8951-41a0-a27a-2759621ab3ff" id="sec.173M-ssec.5-def.suitablyqualifiedperson" type="definition">suitably qualified person</defterm>, in relation to a written report, means a person who—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_adf77d80-2fd9-4536-b715-2cf275063fe4" id="sec.173M-ssec.5-def.suitablyqualifiedperson-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">has the qualifications and experience appropriate for preparing the report; and</txt></block></li><li guid="_52e0f188-62da-4061-a71b-9044bf82279f" id="sec.173M-ssec.5-def.suitablyqualifiedperson-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">meets any other criteria prescribed by regulation.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7227835a-d233-4e9e-83e1-ad29752bb416" id="sec.173N" provision.type="other" spent.amends="0"><no>173N </no><heading guid="_c22e7e02-ff85-4a34-a0fe-9e155a6ab3c0" id="sec.173N-he">Deciding amendment application</heading><subclause affected.by.uncommenced="0" guid="_7954d2e4-32ca-4d08-add0-49e4145bca13" id="sec.173N-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the chief executive is deciding whether or not to amend an end of waste approval—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_18bfb37f-e3f2-4453-9392-197d8fad5224" id="sec.173N-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">on an application made under <intref check="valid" refid="sec.173M" target.guid="_9a5e6125-cae7-40d5-8e57-fed3656d5ee7">section 173M</intref>; or</txt></block></li><li guid="_3115510e-020e-4ac4-9dce-70c5e733c64f" id="sec.173N-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">after giving the holder of the approval a show cause notice about a proposed amendment to the approval under <intref check="valid" refid="sec.173ZB" target.guid="_e5c5f579-dad9-46e8-9371-bae7a3151605">section 173ZB</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b487fb4c-2571-48d8-80da-ae710a692490" id="sec.173N-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In deciding the application, the chief executive must consider—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4b220272-fc58-48fc-bb87-43f610dec624" id="sec.173N-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the effect of the amendment on the management of the particular waste or the use of a particular resource; and</txt></block></li><li guid="_8af03172-6f0c-48e4-9b0a-73b21f3b4908" id="sec.173N-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether the effect of the amendment on the management of a particular waste or the use of a particular resource may, or is likely to, cause any serious environmental harm, material environmental harm or environmental nuisance; and</txt></block></li><li guid="_71df3aac-a6ff-4ccf-8a45-102f8e4d0377" id="sec.173N-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">any relevant advice, information or comment provided by a technical advisory panel.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_122771c0-1c60-4b8a-ba26-7f6d2cbe6467" id="sec.173O" provision.type="other" spent.amends="0"><no>173O </no><heading guid="_b4881d56-6fec-48dd-aa23-9e5b0f8374be" id="sec.173O-he">Applying to transfer end of waste approval</heading><subclause affected.by.uncommenced="0" guid="_b987f7f0-b9c4-4274-85f2-6f142e695c05" id="sec.173O-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The holder of an end of waste approval may apply to the chief executive to transfer the approval to another person.</txt><note guid="_58f3f8d5-b4d8-4205-8442-cecc6c722604" id="sec.173O-ssec.1-note" type="example"><heading guid="_dfca8933-94a9-4f06-9d41-0909e9ac4abf" id="sec.173O-ssec.1-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="ch.8A" target.guid="_7c2636c7-59ac-4241-be5c-684e0ad0e559">chapter 8A</intref>, <intref check="valid" refid="ch.8A-pt.2" target.guid="_38a8cf7c-f387-4459-86c3-7f550cc798c5">part 2</intref> for general provisions that apply to the application.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_6759a1e9-079d-472d-9b3b-98ab42e354c3" id="sec.173O-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application must be accompanied by the signed consent of the proposed transferee.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_01773f6b-1eb5-44df-920a-b01cadf8c5d1" id="sec.173O-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The period for deciding the application is 10 business days.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_53ce967e-769b-4278-8a79-a34fd4fd940b" id="sec.173O-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the chief executive decides to grant the application, the chief executive must, in addition to the notice under <intref check="valid" refid="sec.173W" target.guid="_0630101b-b84d-42e1-b68b-7740561f0928">section 173W</intref>, give a notice about the decision to the proposed transferee within 5 business days after making the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_87c37aa0-8ae1-41de-bc9a-e08d119b5177" id="sec.173P" provision.type="other" spent.amends="0"><no>173P </no><heading guid="_c081548c-02ce-45ad-9c6d-a2151552483e" id="sec.173P-he">Grounds for suspending or cancelling end of waste approval</heading><subclause affected.by.uncommenced="0" guid="_50392b51-3e69-4b83-ac2b-eebb25415ad8" id="sec.173P-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Each of the following is a ground for suspending or cancelling an end of waste approval—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_12b878b5-dabb-46e9-b8ca-645d29fce036" id="sec.173P-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">there is no longer a use, or likely to be a future use, for a particular resource under the approval;</txt></block></li><li guid="_e72401f3-02dd-4177-b1a3-dbbb8767e26a" id="sec.173P-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the management of a particular waste or the use of a particular resource under the approval has caused, or is likely to cause, serious environmental harm, material environmental harm or environmental nuisance that is unlawful under the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Environmental Protection Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.493A" target.doc.id="act-1994-062" target.guid="_d966315e-4775-4992-a111-65152981f367" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act">section 493A</legref>;</txt></block></li><li guid="_8d79d810-bb89-4101-b944-ee36734582ef" id="sec.173P-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the use of the particular waste or a resource the subject of the approval is otherwise unlawful.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5ed5e1ab-9592-495a-a994-97fb989d2dc3" id="sec.173P-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Also, it is a ground for cancelling an end of waste approval that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dc8e91e4-5c3e-4f84-823f-04b836960aba" id="sec.173P-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an end of waste code for a particular resource to which the end of waste approval relates is in effect; and</txt></block></li><li guid="_fc80000a-8490-493a-8143-e120783b9fb3" id="sec.173P-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the chief executive reasonably believes the holder of the end of waste approval may operate under the end of waste code.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3c8e2e51-000c-462d-a7fb-8341a62949d1" id="sec.173Q" provision.type="other" spent.amends="0"><no>173Q </no><heading guid="_570ff47b-276f-413e-8723-0f93ea0926e9" id="sec.173Q-he">Chief executive may seek advice, comment or information</heading><block><txt break.before="1">The chief executive may ask any entity for advice, comment or information about the operation of this part at any time.</txt></block></clause></part></chapter><chapter affected.by.uncommenced="0" guid="_7c2636c7-59ac-4241-be5c-684e0ad0e559" id="ch.8A"><no>Chapter 8A</no><heading guid="_1f2f68a8-15d5-407d-bd20-330cc480dc3f" id="ch.8A-he">General provisions for approvals</heading><part affected.by.uncommenced="0" guid="_65bde583-d499-4317-8acd-6aa75935a527" id="ch.8A-pt.1"><no>Part 1</no><heading guid="_7a7722c6-f2bb-41f1-9036-85bec34b935c" id="ch.8A-pt.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_58d74e1a-d2f6-4bda-bbb5-c9440c3fb19c" id="sec.173R" provision.type="other" spent.amends="0"><no>173R </no><heading guid="_bdcebf4c-9198-4cbd-8b65-be82940c6045" id="sec.173R-he">Application of chapter</heading><subclause affected.by.uncommenced="0" guid="_84d316c5-9821-4a36-a43c-0308e8575338" id="sec.173R-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This chapter applies to the following approvals (each an <defterm guid="_41e19b05-f75e-4878-a90c-0927c5f807ec" id="sec.173R-def.approval" type="definition">approval</defterm>) under this Act—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_847404d1-1a97-4db2-ab42-317d92aa24de" id="sec.173R-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a container approval under <intref check="valid" refid="ch.4" target.guid="_d097040d-7d09-4509-a319-3458078dbcf6">chapter 4</intref>, <intref check="valid" refid="ch.4-pt.3B" target.guid="_966a4f59-9a4a-4284-944b-1b3cc55c7b8c">part 3B</intref>, <intref check="valid" refid="ch.4-pt.3B-div.5" target.guid="_944129c1-82f0-429a-8da5-32e2d5d05a05">division 5</intref>;</txt></block></li><li guid="_b0651cca-2f1a-49a8-a18c-1bbbf8fb446f" id="sec.173R-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an extraordinary circumstances exemption;</txt></block></li><li guid="_01f66162-b354-403d-8d60-a601c0e2c1fd" id="sec.173R-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">an end of waste approval under <intref check="valid" refid="ch.8" target.guid="_598380ab-31bf-4319-8271-2fc98c9c0cef">chapter 8</intref>, <intref check="valid" refid="ch.8-pt.3" target.guid="_b318dbae-1ab4-40ae-b90d-2edf52e8defa">part 3</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f29dcbc1-dba2-4491-bfca-fdac7608a006" id="sec.173R-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In particular, <intref check="valid" refid="ch.8A-pt.2" target.guid="_38a8cf7c-f387-4459-86c3-7f550cc798c5">part 2</intref> applies to making and deciding applications for an approval to be granted, amended, extended or transferred.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6dd8e85b-37b9-4ab5-98cb-a747213356a9" id="sec.173R-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">This chapter does not limit or otherwise affect a requirement under another provision of this Act about a particular approval or making or deciding a particular application.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_38a8cf7c-f387-4459-86c3-7f550cc798c5" id="ch.8A-pt.2"><no>Part 2</no><heading guid="_cc64ac9f-f12b-48b4-a259-47a2262d692c" id="ch.8A-pt.2-he">Applications</heading><clause affected.by.uncommenced="0" guid="_cd78f127-4fb0-4093-8fc9-e7557b805660" id="sec.173S" provision.type="other" spent.amends="0"><no>173S </no><heading guid="_68b78746-b367-469a-ab3e-b86f6f3ebf1c" id="sec.173S-he">Application</heading><block><txt break.before="1">An application must be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b420589b-46fe-4d79-a80d-578588e770ff" id="sec.173S-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in the approved form; and</txt></block></li><li guid="_35030b3f-5646-4bd5-bd35-fe9df3c40c8b" id="sec.173S-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">accompanied by any other information or documents prescribed by regulation for the application; and</txt></block></li><li guid="_89e56c19-8ddf-4099-af37-432bc2ccbc70" id="sec.173S-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">accompanied by the fee prescribed by regulation.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_7646a2c0-f67d-4479-9572-c5136529c334" id="sec.173T" provision.type="other" spent.amends="0"><no>173T </no><heading guid="_442bb223-e32f-4811-a7c5-3609880563a4" id="sec.173T-he">Chief executive may require additional information or documents</heading><subclause affected.by.uncommenced="0" guid="_c7d09dcb-3f5e-4aab-95cf-5d363e3d9523" id="sec.173T-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may, by notice, require the applicant to give the chief executive further information or documents the chief executive reasonably requires to decide the application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_67f6875e-c25c-4a43-86e8-2c693da841cb" id="sec.173T-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1274037c-ec50-4f4b-b15a-d9d0948141b3" id="sec.173T-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be given to the applicant within 20 business days after the chief executive receives the application; and</txt></block></li><li guid="_b65388ac-7e14-4fb6-9a47-b9f14ca9e9eb" id="sec.173T-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state a reasonable period within which the applicant must comply with the notice.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a55b1520-9cb4-4023-8775-9a1661964296" id="sec.173T-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive and the applicant may, before the stated period ends, agree to extend the period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7643ac94-778b-4018-88d2-a76f716f4c70" id="sec.173T-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The application is taken to have lapsed if the applicant does not comply with the notice.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_54ed8b28-1df7-4ed7-b162-52f77fde15d5" id="sec.173U" provision.type="other" spent.amends="0"><no>173U </no><heading guid="_b2a8672d-0638-4b3f-8d25-23de94dcc5c8" id="sec.173U-he">Deciding application</heading><subclause affected.by.uncommenced="0" guid="_2a4c5a5e-f3c0-46f0-9867-30f0854b332b" id="sec.173U-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must decide to grant or refuse to grant the application within the required decision-making period for the application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ce51db5f-6394-4d56-b0e2-6297dca9674b" id="sec.173U-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the chief executive may extend, on 1 occasion, the required decision-making period for deciding the application by giving the applicant a notice about the extension before the end of the period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_330b24e7-9eb7-4420-9031-a81a6fc0d48e" id="sec.173U-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The extension must not be more than—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_edd9a897-f924-4ff4-9528-44d56875b10f" id="sec.173U-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if another provision of this Act states a period by which the required decision-making period may be extended—the stated period; or</txt></block></li><li guid="_44f03771-6a17-4957-9148-0cac05357ad9" id="sec.173U-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—10 business days.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_cc8b5fcb-3b9e-4118-9410-4fbe5692e1fa" id="sec.173U-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A failure to make a decision under this section is taken to be a decision to refuse to grant the application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_03071ebb-3ea8-469c-9847-26cb2648c13c" id="sec.173U-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_045c6e28-2a39-48c0-9af4-d274266e592c" id="sec.173U-ssec.5-def.requireddecisionmakingperiod_"><txt break.before="1"><defterm guid="_71818a3f-2ea1-47b3-9e24-dab1c606f8e7" id="sec.173U-ssec.5-def.requireddecisionmakingperiod" type="definition">required decision-making period</defterm>, for an application, means the period—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e5b1e190-47c3-4291-b6d1-639b8acf0f2d" id="sec.173U-ssec.5-def.requireddecisionmakingperiod-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that starts on the later of the following days—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7c59dfc5-9e48-488d-8e34-8e351a9e931e" id="sec.173U-ssec.5-def.requireddecisionmakingperiod-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the day the chief executive receives the application;</txt></block></li><li guid="_29ccc8a1-0e98-4189-b3cd-eaae843bbb1b" id="sec.173U-ssec.5-def.requireddecisionmakingperiod-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if further information or documents are requested under <intref check="valid" refid="sec.173T" target.guid="_7646a2c0-f67d-4479-9572-c5136529c334">section 173T</intref>—the day the chief executive receives the information or documents; and</txt></block></li></list></block></li><li guid="_085e1acf-f7b8-45b0-beda-4544fcac5694" id="sec.173U-ssec.5-def.requireddecisionmakingperiod-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that ends after either of the following periods—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a587af79-be4f-4aec-9174-0a975fec426d" id="sec.173U-ssec.5-def.requireddecisionmakingperiod-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">if another provision of this Act states a period for deciding the application—the stated period;</txt></block></li><li guid="_5ca8192f-876b-4249-8fd1-b076baf59116" id="sec.173U-ssec.5-def.requireddecisionmakingperiod-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">otherwise—20 business days.</txt></block></li></list></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b182f461-3f03-4099-85a6-2cc35af8bb9a" id="sec.173V" provision.type="other" spent.amends="0"><no>173V </no><heading guid="_256c2e44-aa40-4ad5-a152-39f92d4c4fd6" id="sec.173V-he">General criteria for deciding application</heading><subclause affected.by.uncommenced="0" guid="_374270fa-2cd1-4638-be24-5721941f4c25" id="sec.173V-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">In deciding the application, the chief executive must consider the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fd8069e0-27b0-40b9-8d20-81da4750b396" id="sec.173V-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the objects of this Act and how they are to be achieved, as stated in <intref check="valid" refid="ch.1" target.guid="_a76c0db3-d9c9-4095-9a30-beaab8465e54">chapter 1</intref>, <intref check="valid" refid="ch.1-pt.2" target.guid="_fe94d6f8-d7d7-45ee-b632-e5862debf4ee">part 2</intref>;</txt></block></li><li guid="_f60b4941-3d64-481d-bce7-c52306b29626" id="sec.173V-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the waste and resource management hierarchy;</txt></block></li><li guid="_ef7b7b33-e33b-402a-8873-3d62e16732a9" id="sec.173V-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a matter for the decision stated in another provision of this Act;</txt></block></li><li guid="_82e47321-215f-4771-8c3f-49e9e3326208" id="sec.173V-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">another matter prescribed by regulation for the decision.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9995691a-45fc-423a-b432-526b65dfafb9" id="sec.173V-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">This section does not limit the matters the chief executive may consider in making the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0630101b-b84d-42e1-b68b-7740561f0928" id="sec.173W" provision.type="other" spent.amends="0"><no>173W </no><heading guid="_1a9d5111-0840-45ac-b4d2-9b93b2a8f8cc" id="sec.173W-he">Granting application</heading><subclause affected.by.uncommenced="0" guid="_c2c379a0-184f-4f38-8cbb-bd1e920cb359" id="sec.173W-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the chief executive decides to grant the application, the chief executive must give the applicant a notice about the decision within 5 business days after making the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_483e1851-63c9-4f28-b1f3-38d793862f56" id="sec.173W-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the decision is to grant an approval, the notice must state the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_eb23126d-2817-448c-9e3a-acbc4f6d4b4b" id="sec.173W-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that the approval has been granted;</txt></block></li><li guid="_3b1994fc-044c-443f-8710-9f04eb6377e4" id="sec.173W-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the person to whom the approval is granted;</txt></block></li><li guid="_0107373d-1d88-466f-9549-be6ae86c3687" id="sec.173W-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the approval is granted for a term—when the approval ends;</txt></block></li><li guid="_45f9bcb4-2bdf-4d5f-9b16-22f00434d619" id="sec.173W-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a matter stated in another provision of this Act for the notice;</txt></block></li><li guid="_54cb454a-ba8d-4ccb-984f-d77311c4d162" id="sec.173W-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">any conditions imposed on the approval;</txt></block></li><li guid="_184879b3-da7d-4989-bec4-7f7f9534c50a" id="sec.173W-ssec.2-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">if conditions are imposed on the approval—the reasons for the conditions.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b17dcadc-f0ef-4cdf-abce-f60d85ec6327" id="sec.173W-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the decision is to amend an approval, the notice must state the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e944e2e9-4715-4076-a34a-a248db506ed2" id="sec.173W-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">how the approval is amended;</txt></block></li><li guid="_62734e18-a939-42cc-88c1-635636554514" id="sec.173W-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any new conditions imposed on the approval;</txt></block></li><li guid="_a28a2152-524e-4c5e-8f3f-72077fd44862" id="sec.173W-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">any existing conditions amended for the approval;</txt></block></li><li guid="_81fea8fa-93e5-4277-a5ae-debdba1f00b1" id="sec.173W-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">when the amendment takes effect.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_11604dde-e6fb-49b4-b751-f54c76f17487" id="sec.173W-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the chief executive imposes or amends any conditions on the approval, the notice must also be an information notice for the decision to impose the conditions.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f06fadca-f26b-481a-a66b-fc99e9cc1aee" id="sec.173X" provision.type="other" spent.amends="0"><no>173X </no><heading guid="_89d59f06-2481-487c-840e-f3de1e2d1316" id="sec.173X-he">Conditions of approval</heading><block><txt break.before="1">If the chief executive decides to grant or amend an approval, the chief executive may impose the conditions on the approval the chief executive considers necessary or desirable.</txt></block></clause><clause affected.by.uncommenced="0" guid="_22234d0e-2cda-4b98-98c0-8ad49b9636ba" id="sec.173Y" provision.type="other" spent.amends="0"><no>173Y </no><heading guid="_5a92e056-3df8-47dd-bd60-f0075ff4b4ee" id="sec.173Y-he">Refusal of application</heading><block><txt break.before="1">If the chief executive decides to refuse to grant the application, the chief executive must, within 10 business days of making the decision, give the applicant an information notice for the decision.</txt></block></clause></part><part affected.by.uncommenced="0" guid="_e228dabb-d438-407a-ae32-586d89e13499" id="ch.8A-pt.3"><no>Part 3</no><heading guid="_67048b08-3e52-48a5-bd32-17df75f58a50" id="ch.8A-pt.3-he">Amendment, suspension or cancellation</heading><clause affected.by.uncommenced="0" guid="_8fd47f75-80be-41b2-a9eb-23428bad4a0a" id="sec.173Z" provision.type="other" spent.amends="0"><no>173Z </no><heading guid="_8c22e2eb-96c6-40ec-bced-43a92b07563e" id="sec.173Z-he">Amendment of approval</heading><block><txt break.before="1">The chief executive may, on the chief executive’s own initiative, amend an approval.</txt></block></clause><clause affected.by.uncommenced="0" guid="_24ba2dd1-223b-4cfe-b12e-eef62fbe280e" id="sec.173ZA" provision.type="other" spent.amends="0"><no>173ZA </no><heading guid="_84a3f990-aec2-4dfe-864b-629efea00c32" id="sec.173ZA-he">Suspension or cancellation of approval</heading><block><txt break.before="1">The chief executive may suspend or cancel an approval if the chief executive is satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0ecd1256-6e2b-4bea-89c5-359ca7522053" id="sec.173ZA-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a ground for suspending or cancelling the approval stated in another provision of this Act exists; or</txt></block></li><li guid="_2f32d129-4462-42f3-9f11-f0518d7076ad" id="sec.173ZA-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the approval was granted because of a materially false or misleading representation or declaration; or</txt></block></li><li guid="_bd4c0374-d8a7-4822-8c52-003008ca8a13" id="sec.173ZA-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the approval was granted on the basis of particular matters or information that have changed and the change is likely to cause serious environmental harm, material environmental harm or environmental nuisance; or</txt></block></li><li guid="_9d804b1b-0b62-4bfe-933f-8ba860d72916" id="sec.173ZA-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a condition imposed on the approval has not been complied with; or</txt></block></li><li guid="_9f773d82-ac2f-47de-8ce1-ba385e314b61" id="sec.173ZA-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">a request for information about the approval under <intref check="valid" refid="sec.173ZF" target.guid="_956443d3-bdcd-41a3-8253-3b06f8378a0d">section 173ZF</intref> has not been complied with; or</txt></block></li><li guid="_fac8ed0b-c27d-4835-97df-234ad9d3df20" id="sec.173ZA-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">it is necessary or desirable to do so having regard to the objects of the <legref check="valid" jurisd="QLD" target.doc.id="act-2011-031" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" type="act">Act</legref>.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_e5c5f579-dad9-46e8-9371-bae7a3151605" id="sec.173ZB" provision.type="other" spent.amends="0"><no>173ZB </no><heading guid="_fe894d98-459f-4662-a61d-593496e59950" id="sec.173ZB-he">Show cause notice</heading><subclause affected.by.uncommenced="0" guid="_6055ba1e-788a-4a03-95fd-9fc3a58c0ca8" id="sec.173ZB-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the chief executive proposes to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d35cc17f-0cec-41fa-af73-af0612684280" id="sec.173ZB-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">amend an approval (the <defterm guid="_c90e11c6-95c0-454e-98c8-40662faa36a1" id="sec.173ZB-ssec.1-def.proposedaction" type="definition">proposed action</defterm>); or</txt></block></li><li guid="_1c133711-ec66-4b60-91f9-ddfe47923a73" id="sec.173ZB-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">suspend or cancel an approval (also the <defterm guid="_efa95a51-66c8-4a0e-9c79-36174a7e69e7" id="sec.173ZB-ssec.1-def.proposedaction-oc.2" type="definition">proposed action</defterm>).</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0ff1a816-497f-41ee-93cf-aaa5fbaa7ace" id="sec.173ZB-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive must give a notice (a <defterm guid="_0dab1518-6baa-4edf-b891-5b5ec056c9e9" id="sec.173ZB-def.showcausenotice" type="definition">show cause notice</defterm>) about the proposed action to the holder of the approval.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a47c73fa-3e15-4825-a259-0db23bc701c7" id="sec.173ZB-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The show cause notice must state the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f124fb3c-ab97-4ff3-8a57-aa1b9aad53f5" id="sec.173ZB-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the proposed action;</txt></block></li><li guid="_23eabea1-b41b-446b-86f7-3fbdf43c2aa2" id="sec.173ZB-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the proposed action is an amendment—the proposed amendment;</txt></block></li><li guid="_1865e091-171e-4bd3-8bf6-90cb1d6824fb" id="sec.173ZB-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the proposed action is suspension—the proposed period of the suspension;</txt></block></li><li guid="_3bd3b8e8-e1db-4daa-9b97-63d85c5ffb4e" id="sec.173ZB-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the grounds for the proposed action;</txt></block></li><li guid="_692fddf4-0678-4e79-bce4-0851d9b39997" id="sec.173ZB-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the facts and circumstances that form the basis for the grounds;</txt></block></li><li guid="_405285a0-4ba2-4d77-89e2-5af0f654539c" id="sec.173ZB-ssec.3-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">that the holder may, within a stated period (the <defterm guid="_d5888bbb-817f-4d95-92bd-e652f1fda6ff" id="sec.173ZB-ssec.3-def.showcauseperiod" type="definition">show cause period</defterm>), make a written submission to the chief executive about why the proposed action should not be taken.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3fd647c4-f2b8-4a97-9e9d-73bdc09cdcad" id="sec.173ZB-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The show cause period must end at least 28 days after the holder of the approval is given the show cause notice.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f2caef6e-b584-4f48-a759-494ed6fff8b3" id="sec.173ZC" provision.type="other" spent.amends="0"><no>173ZC </no><heading guid="_57f4b82f-f38f-4b64-95c1-d137163682d6" id="sec.173ZC-he">Decision about proposed amendment, suspension or cancellation</heading><subclause affected.by.uncommenced="0" guid="_9557092b-7981-431c-b0d9-5b72b9b34435" id="sec.173ZC-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Within 20 business days after the end of the period for making submissions stated in the show cause notice, the chief executive must decide whether or not to take the proposed action.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6c0c28cf-a1c2-4294-bd8e-5a4fff700dfe" id="sec.173ZC-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may decide—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d4c4a93f-bee2-4f9e-9a18-cffd7d81951d" id="sec.173ZC-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the proposed action was to make a stated amendment—to make the stated amendment; or</txt></block></li><li guid="_bc6848ef-2ec8-47e4-b632-5c8cb17f814c" id="sec.173ZC-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the proposed action was to suspend the appointment for a stated period—to suspend the appointment for no longer than the stated period; or</txt></block></li><li guid="_b661bda9-4191-4a42-9086-df3b9b592cc0" id="sec.173ZC-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the proposed action was to cancel the appointment—to suspend the appointment for a period or cancel the appointment.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_08b01f8f-484d-484d-a429-402534ca9214" id="sec.173ZC-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the chief executive may extend, on 1 occasion and by no more than 20 business days, the period for making a decision by giving a notice about the extension to the applicant before the end of the period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e9d91de2-8550-41e3-9477-f0df95075848" id="sec.173ZC-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In deciding whether or not to take the proposed action, the chief executive must consider the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8e27639e-a6ef-4220-9a12-cabd2e1b4b17" id="sec.173ZC-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">all submissions made by the holder of the approval during the show cause period;</txt></block></li><li guid="_ed25bc49-ddb5-4bf2-9601-8b2c937ebae2" id="sec.173ZC-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the proposed action is an amendment—the effect of the proposed amendment;</txt></block></li><li guid="_94afd2a6-ad7b-4115-9ab0-2fed66e59372" id="sec.173ZC-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the objects of this Act and how they are to be achieved, as stated in <intref check="valid" refid="ch.1" target.guid="_a76c0db3-d9c9-4095-9a30-beaab8465e54">chapter 1</intref>, <intref check="valid" refid="ch.1-pt.2" target.guid="_fe94d6f8-d7d7-45ee-b632-e5862debf4ee">part 2</intref>;</txt></block></li><li guid="_1ae2db9d-f44a-470c-9ff1-dfaec082b201" id="sec.173ZC-ssec.4-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the waste and resource management hierarchy;</txt></block></li><li guid="_ce560a49-44c1-45c2-ae60-65c6ea76bf4d" id="sec.173ZC-ssec.4-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">another matter prescribed by regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6b11c692-bcd9-45b2-8047-8c25b27bf970" id="sec.173ZC-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the chief executive decides to take the proposed action, the chief executive must, within 10 business days after making the decision, give the holder of the approval an information notice for the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0c683633-6102-4916-a1c5-8501f79044c5" id="sec.173ZC-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The decision to take the proposed action takes effect on the later of the following days—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ef7acbbc-610d-4ec5-b232-0baee3433c2e" id="sec.173ZC-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the day the information notice is given to the holder of the approval;</txt></block></li><li guid="_65fb89e5-c27b-4569-a71f-97edb671d9d2" id="sec.173ZC-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a day stated in the information notice.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_697b5780-84f7-4248-8e04-596ac6419496" id="sec.173ZC-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">If the chief executive decides not to take the proposed action, the chief executive must give the holder of the approval a notice about the decision within 5 business days after making the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_599e5919-3032-43e7-848c-7df0e4a418b4" id="sec.173ZD" provision.type="other" spent.amends="0"><no>173ZD </no><heading guid="_be23e837-cc10-41dc-9ba7-b48a1092dd4e" id="sec.173ZD-he">Minor amendment of approval</heading><subclause affected.by.uncommenced="0" guid="_2d36c161-7fac-4c80-8f76-2adffb1fd782" id="sec.173ZD-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may make a minor amendment of an approval by giving a notice about the amendment to the holder of the approval.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c44fceda-461a-4301-bed0-443526ae7470" id="sec.173ZD-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">This section applies despite <intref check="valid" refid="sec.173ZB" target.guid="_e5c5f579-dad9-46e8-9371-bae7a3151605">sections 173ZB</intref> and <intref check="valid" refid="sec.173ZC" target.guid="_f2caef6e-b584-4f48-a759-494ed6fff8b3">173ZC</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f9832f44-6951-44a5-93e7-3ca74e1ac35d" id="sec.173ZD-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_e91b41c2-de08-477e-99a2-d45927619558" id="sec.173ZD-ssec.3-def.minoramendment_"><txt break.before="1"><defterm guid="_e9c1bc2c-6256-47d2-aba2-72c16bf4020a" id="sec.173ZD-ssec.3-def.minoramendment" type="definition">minor amendment</defterm>, of an approval, means an amendment of the approval—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3f1e5e8c-d190-47e3-be55-808bd35436bf" id="sec.173ZD-ssec.3-def.minoramendment-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to correct a minor or formal error in the approval; or</txt></block></li><li guid="_e616223e-d976-4c99-978c-42fab6f668de" id="sec.173ZD-ssec.3-def.minoramendment-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to make a change that is not a change of substance and does not adversely affect the interests of the holder of the approval or another person.</txt></block></li></list></definition></deflist></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_343c45de-d042-4436-a6ba-a07e9c7ef448" id="ch.8A-pt.4"><no>Part 4</no><heading guid="_9e0df6fc-7137-40f6-95eb-c82000e5c980" id="ch.8A-pt.4-he">Miscellaneous</heading><clause affected.by.uncommenced="0" guid="_209210e7-f695-4e24-b2a6-ff72dab019db" id="sec.173ZE" provision.type="other" spent.amends="0"><no>173ZE </no><heading guid="_094127dd-2911-4d63-9e02-0a259487c0d1" id="sec.173ZE-he">Surrender of approval</heading><block><txt break.before="1">The holder of an approval may surrender the approval by giving the chief executive a notice about the surrender.</txt></block></clause><clause affected.by.uncommenced="0" guid="_956443d3-bdcd-41a3-8253-3b06f8378a0d" id="sec.173ZF" provision.type="other" spent.amends="0"><no>173ZF </no><heading guid="_2bc7dd68-d071-47ec-ad9e-6841ab96a826" id="sec.173ZF-he">Request for information about approval</heading><subclause affected.by.uncommenced="0" guid="_5c0de334-1714-4be4-9947-83793beacf53" id="sec.173ZF-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may, by notice, require any of the following persons to give the chief executive information about an approval—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_436110e3-c62d-4a8c-a850-d5c3b8a2cd8a" id="sec.173ZF-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the holder of the approval;</txt></block></li><li guid="_c853daf1-0d79-4486-92ed-350ab7c5cec5" id="sec.173ZF-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the approval was transferred to another person in the 5 years before the notice was given—a previous holder of the approval;</txt></block></li><li guid="_31be3a88-9276-4d3f-a69e-d270f2d8afab" id="sec.173ZF-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the approval was cancelled, surrendered or otherwise ended in the 5 years before the notice was given—a person who was the holder of the approval.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0457b272-66a1-447c-8f5f-7e52d6ac9934" id="sec.173ZF-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3e1676d7-a333-4e14-9af7-c375f326df0e" id="sec.173ZF-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the information required; and</txt></block></li><li guid="_907fe7b1-433b-46f7-ad7b-b3d8e4251179" id="sec.173ZF-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">why the information is required; and</txt></block></li><li guid="_d9c14e4d-2878-4440-83bc-da78561d4e1c" id="sec.173ZF-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the day by which the information is to be given to the chief executive.</txt></block></li></list></block></subclause></clause></part></chapter><chapter affected.by.uncommenced="0" guid="_f87113fc-b8b5-4d77-bf6d-0ff636dc4f53" id="ch.9"><no>Chapter 9</no><heading guid="_7686f48e-f722-4e8b-9124-6059ef0d1c2b" id="ch.9-he">Reviews</heading><part affected.by.uncommenced="0" guid="_ad404a1b-abd8-4a3f-b648-ca96982b0046" id="ch.9-pt.1"><no>Part 1</no><heading guid="_e00f653b-8303-427b-b213-60cf45bdb79a" id="ch.9-pt.1-he">Internal reviews</heading><clause affected.by.uncommenced="0" guid="_0e1a4a67-a5f4-4f99-ac9a-82b94e57829e" id="sec.174" provision.type="other" spent.amends="0"><no>174</no><heading guid="_10e7dd71-67d5-4a88-9394-b86d49d882c3" id="sec.174-he">Internal review process</heading><block><txt break.before="1">Every external review of a decision to which an information notice relates must be in the first instance by way of an application for internal review.</txt></block></clause><clause affected.by.uncommenced="0" guid="_dd491b1a-b12c-4d07-a495-62fb7ff394f3" id="sec.175" provision.type="other" spent.amends="0"><no>175</no><heading guid="_6ea2fa77-d2fc-4216-b5c0-09c9d0a7a348" id="sec.175-he">Who may apply for internal review</heading><block><txt break.before="1">A person who, under this Act, has been given, or who is entitled to be given, an information notice for a decision may apply for an internal review of the decision (an <defterm guid="_6075a5ae-49d2-4886-adf5-520860a2759a" id="def.internalreviewapplication" type="definition">internal review application</defterm>).</txt></block></clause><clause affected.by.uncommenced="0" guid="_a434d8ec-ab94-4b7b-853a-2d52caf5bb12" id="sec.176" provision.type="other" spent.amends="0"><no>176</no><heading guid="_bfe39a57-353d-426e-9448-e0940b971c9a" id="sec.176-he">Requirements for making application</heading><subclause affected.by.uncommenced="0" guid="_71488b06-9ed7-4ee3-9793-f9c3c03f5c9f" id="sec.176-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An internal review application must be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_94229b74-10d5-4c53-af88-e87a3512ca3b" id="sec.176-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">made to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_49469827-1d52-4754-9e2b-adbc32e9b58f" id="sec.176-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">for a decision made by the Organisation under <intref check="valid" refid="ch.4" target.guid="_d097040d-7d09-4509-a319-3458078dbcf6">chapter 4</intref>, <intref check="valid" refid="ch.4-pt.3B" target.guid="_966a4f59-9a4a-4284-944b-1b3cc55c7b8c">part 3B</intref>—the Organisation; or</txt></block></li><li guid="_39cf2dac-e166-47c5-a236-3ea04c92b7fa" id="sec.176-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">otherwise—the chief executive; and</txt></block></li></list></block></li><li guid="_55ea5ca6-b5b4-4869-8ead-79ac70e3caf8" id="sec.176-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">in the approved form; and</txt></block></li><li guid="_d7cad300-7a26-4454-a1b4-7a87ae805689" id="sec.176-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">supported by enough information to enable the application to be decided; and</txt></block></li><li guid="_73764069-57cf-4b9c-b567-23d25cd2e4e6" id="sec.176-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">made within 14 days after the applicant is given the information notice for the decision the subject of the application.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_41ec292c-2b74-4993-861b-345d6fd93c09" id="sec.176-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the chief executive or Organisation may, at any time, extend the time for making an internal review application.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e65882b2-5243-4727-b940-165dd6d71c86" id="sec.177" provision.type="other" spent.amends="0"><no>177</no><heading guid="_4c7d557f-a8c2-4eb4-a201-6faa8b1ee015" id="sec.177-he">Decision not stayed</heading><subclause affected.by.uncommenced="0" guid="_b39ee5df-7c4d-4314-9fc0-2e9a747ca771" id="sec.177-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An internal review application does not stay the decision the subject of the application (the <defterm guid="_8dd528cb-12a8-4388-8ddb-d35d2a88bf09" id="sec.177-def.originaldecision" type="definition">original decision</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_828ae7c0-63b2-48b3-a1ed-a9ffe617a997" id="sec.177-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the applicant may immediately apply for a stay of the original decision to the relevant entity.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_884fb347-bb27-4cb1-be03-7d52bb6e68cb" id="sec.177-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The relevant entity may stay the original decision to secure the effectiveness of the internal review and a later external review by QCAT.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ed5b388d-68f6-4f00-b32c-e518012ac31d" id="sec.177-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The stay—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e580c87a-21f8-426d-b1e0-c9f3d959fc21" id="sec.177-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">may be given on conditions the relevant entity considers appropriate; and</txt></block></li><li guid="_d2a598bb-dbab-49d8-a6c5-e62cceb2bd3e" id="sec.177-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">operates for the period fixed by the relevant entity; and</txt></block></li><li guid="_a7293e25-d98d-4456-9d5f-25eec032adda" id="sec.177-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">may be amended or revoked by the relevant entity.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_07bec68f-9c45-4794-8bf7-c3e54860e22b" id="sec.177-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The period of the stay must not extend past the time when the chief executive makes the internal review decision about the original decision and any later period the relevant entity allows to enable the applicant to apply to QCAT for a review of the internal review decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bb52eb23-019e-474c-8ec8-816b6625e469" id="sec.177-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">An internal review application affects the original decision, or carrying out of the decision, only if the decision is stayed.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8359d057-c503-450c-8c71-ea22e5a51eea" id="sec.177-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_fc7f699c-a2fe-4944-b713-be101beb3ed1" id="sec.177-ssec.7-def.relevantentity_"><txt break.before="1"><defterm guid="_1c2b0eb6-edb5-41fe-97c4-c33c2c4b8204" id="sec.177-ssec.7-def.relevantentity" type="definition">relevant entity</defterm> means the chief executive, Organisation or QCAT.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f11dca8a-acba-4193-892c-b49665cb9c83" id="sec.178" provision.type="other" spent.amends="0"><no>178</no><heading guid="_72b81397-d4b3-45e4-8f7d-fa6c08c33305" id="sec.178-he">Internal review</heading><subclause affected.by.uncommenced="0" guid="_4f834f6d-3343-4068-8820-91c409bb688a" id="sec.178-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive or Organisation must, within 20 days after receiving an internal review application made under <intref check="valid" refid="sec.176" target.guid="_a434d8ec-ab94-4b7b-853a-2d52caf5bb12">section 176</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7f57b24d-dda4-404c-9ebc-bf10cdb4f931" id="sec.178-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">conduct an internal review of the decision the subject of the application (the <defterm guid="_4fdb79d8-a9af-4393-9c97-e8f4ba72b5db" id="sec.178-ssec.1-def.originaldecision" type="definition">original decision</defterm>); and</txt></block></li><li guid="_c56e34d0-7f58-40b1-888a-21efabe0f5c3" id="sec.178-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">make a decision (the <defterm guid="_c8db5dcf-42e7-48d8-b662-15a4847ecbf8" id="sec.178-ssec.1-def.internalreviewdecision" type="definition">internal review decision</defterm>) to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7455425c-4b79-48d9-bc74-173a99ad7ca9" id="sec.178-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">confirm the original decision; or</txt></block></li><li guid="_cb5dcf83-a22d-486b-8f01-90d1f9d03c5d" id="sec.178-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">amend the original decision; or</txt></block></li><li guid="_a2646cae-76db-4655-887b-2e42a0b11eeb" id="sec.178-ssec.1-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">substitute another decision for the original decision.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b8708e9d-c740-4be4-8cb7-e43207674aae" id="sec.178-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application must not be dealt with by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a7ab8cf3-7388-47d5-ad3c-a154fec0b093" id="sec.178-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the person who made the original decision; or</txt></block></li><li guid="_1f1bf4fd-5eb0-44ff-95d8-0eeeac8434ca" id="sec.178-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a person in a less senior office than the person who made the original decision.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d59e9252-fa75-455d-a5dd-fbfd7a162f10" id="sec.178-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0"><intref check="valid" refid="sec.178-ssec.2" target.guid="_b8708e9d-c740-4be4-8cb7-e43207674aae">Subsection (2)</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f4649968-ad4b-4e04-b38e-4dda24e5f52a" id="sec.178-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">applies despite the <legref check="valid" jurisd="QLD" target.doc.id="act-1954-003" target.version.series="3cfb010e-ce09-4afd-baf6-bd10d22741a7" type="act"><name emphasis="yes">Acts Interpretation Act 1954</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.27A" target.doc.id="act-1954-003" target.guid="_c4a723d2-113f-49df-b9e5-162a6feab2a1" target.version.series="3cfb010e-ce09-4afd-baf6-bd10d22741a7" type="act">section 27A</legref>; and</txt></block></li><li guid="_268cc29c-773c-4b70-b9e7-4e36580aafe3" id="sec.178-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">does not apply to an original decision made—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f1c5caf5-6cea-44fe-aed9-96db630e81d0" id="sec.178-ssec.3-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">personally by the chief executive; or</txt></block></li><li guid="_652dcb0b-50a9-4e69-a552-48efdbc4a305" id="sec.178-ssec.3-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">by the board of directors of the Organisation.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e82a5c84-8a39-4daa-a18f-ba33749907e0" id="sec.178-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the internal review decision confirms the original decision, for the purpose of an external review, the original decision is taken to be the internal review decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a6cd1489-5fd0-46aa-ae72-2a42a49ce4c3" id="sec.178-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the internal review decision amends the original decision, for the purpose of an external review, the original decision as amended is taken to be the internal review decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_84126db8-40a5-4368-8640-8f7b2f7db260" id="sec.179" provision.type="other" spent.amends="0"><no>179</no><heading guid="_c21823ca-2b4b-478a-9617-1f368c84ae1f" id="sec.179-he">Notice of internal review decision</heading><subclause affected.by.uncommenced="0" guid="_0e705340-60d7-4961-ba09-ca64c3273f50" id="sec.179-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive or Organisation must, within 10 days after making an internal review decision, give the applicant notice of the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6b59d784-2dba-4611-886d-baf8c0a84061" id="sec.179-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the internal review decision is not the decision sought by the applicant, the notice must be accompanied by a QCAT information notice for the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c2151750-6603-4654-9c08-a396f8e3134d" id="sec.179-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the chief executive or Organisation does not give the notice within the 10 days, the chief executive or Organisation is taken to have made an internal review decision confirming the original decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_784140d5-f3eb-4eb1-affc-5b5d4a80bdbc" id="sec.179-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_fa66bdf2-f1c4-4f91-a6bb-8112b771071a" id="sec.179-ssec.4-def.QCATinformationnotice_"><txt break.before="1"><defterm guid="_f11f7c80-bcdb-4df2-a433-ea13d51f8f0a" id="sec.179-ssec.4-def.QCATinformationnotice" type="definition">QCAT information notice</defterm> means a notice complying with the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">QCAT Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.157" target.doc.id="act-2009-023" target.guid="_91254813-a24a-46a1-8a51-ca252fb5f65a" target.version.series="c51aec25-167d-4389-82a2-012d28089e17" type="act">section 157</legref><legref check="unknown" jurisd="QLD" type="act">(2)</legref>.</txt></definition></deflist></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_da27995c-199f-4610-9ee0-c8dedf30b552" id="ch.9-pt.2"><no>Part 2</no><heading guid="_2084f72a-9985-4a2f-9807-8b2339a5685f" id="ch.9-pt.2-he">External reviews by QCAT</heading><clause affected.by.uncommenced="0" guid="_6a3048dd-278b-40a9-a8f0-c197605ecc39" id="sec.180" provision.type="other" spent.amends="0"><no>180</no><heading guid="_8fed7bfb-4f4f-453b-83f5-7060c57abc3e" id="sec.180-he">Who may apply for external review</heading><block><txt break.before="1">A person given, or entitled to be given, a QCAT information notice under <intref check="valid" refid="sec.179" target.guid="_84126db8-40a5-4368-8640-8f7b2f7db260">section 179</intref> for an internal review decision may apply, as provided under the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">QCAT Act</name></legref>, to QCAT for an external review of the decision.</txt></block></clause></part></chapter><chapter affected.by.uncommenced="0" guid="_09fa7a87-ea51-4658-95bd-97bd9fce9027" id="ch.10"><no>Chapter 10</no><heading guid="_e74e73cd-44e3-4c32-bf16-c383cae8efff" id="ch.10-he">Authorised persons</heading><part affected.by.uncommenced="0" guid="_318cf608-ec68-49a4-8cfe-70bbb00fc90d" id="ch.10-pt.1"><no>Part 1</no><heading guid="_05aff012-4b43-4ac8-b7ab-8b68fbf91896" id="ch.10-pt.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_05db7fe2-0cb0-42f6-a6e2-f72f622036f8" id="sec.181" provision.type="other" spent.amends="0"><no>181</no><heading guid="_ff45e781-7db4-4085-a95b-53310a26f8fc" id="sec.181-he">Definitions for ch 10</heading><block><txt break.before="1">In this chapter—</txt><deflist><definition affected.by.uncommenced="0" guid="_e1227492-198a-489b-98c8-ca8ec4e0ec63" id="sec.181-def.disposalorder_"><txt break.before="1"><defterm guid="_e5040bb9-77a6-4977-bc13-a321a47df16e" id="sec.181-def.disposalorder" type="definition">disposal order</defterm> see <intref check="valid" refid="sec.231" target.guid="_ac8d809c-13dc-4764-8be0-f2cfd3e63e87">section 231</intref><intref check="valid" refid="sec.231-ssec.2" target.guid="_076ba3f6-54d4-47de-8ed3-f70e3f564ac3">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_baa15a2a-af04-4303-9cc0-b518a2aa48c9" id="sec.181-def.documentcertificationrequirement_"><txt break.before="1"><defterm guid="_ac77668c-5699-4cd6-8048-cc7944910d87" id="sec.181-def.documentcertificationrequirement" type="definition">document certification requirement</defterm> see <intref check="valid" refid="sec.234" target.guid="_3d7d3070-4795-44f3-a13d-044c7151c49e">section 234</intref><intref check="valid" refid="sec.234-ssec.6" target.guid="_2481fa86-660c-4f99-9197-25306a5c2ff9">(6)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_f6e5fdee-8ded-48a9-a9b9-f87c46cad04c" id="sec.181-def.documentproductionrequirement_"><txt break.before="1"><defterm guid="_f03701f7-adcd-4984-adac-893f2d0385ce" id="sec.181-def.documentproductionrequirement" type="definition">document production requirement</defterm> see <intref check="valid" refid="sec.234" target.guid="_3d7d3070-4795-44f3-a13d-044c7151c49e">section 234</intref><intref check="valid" refid="sec.234-ssec.2" target.guid="_8cf4a172-34c9-4ed1-8483-05d22d18007a">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_f4254bef-1120-451e-a296-f53e30c9f2a3" id="sec.181-def.electronicdocument_"><txt break.before="1"><defterm guid="_0a0bbbb2-8537-4842-a17c-bea4c6ce5d10" id="sec.181-def.electronicdocument" type="definition">electronic document</defterm> means a document of a type under the <legref check="valid" jurisd="QLD" target.doc.id="act-1954-003" target.version.series="3cfb010e-ce09-4afd-baf6-bd10d22741a7" type="act"><name emphasis="yes">Acts Interpretation Act 1954</name></legref>, <legref check="valid" jurisd="QLD" refid="sch.1" target.doc.id="act-1954-003" target.guid="_905ca299-c8cf-42dd-81f3-10fa1bc85989" target.version.series="3cfb010e-ce09-4afd-baf6-bd10d22741a7" type="act">schedule 1</legref>, definition <defterm guid="_88616087-2a42-47e0-a9c0-c8365ffab209" type="mention">document</defterm>, <intref check="invalid" refid="sec.181-def.electronicdocument_-para1.c">paragraph (c)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_bf00a30b-b0f7-4e64-a9da-dd59d240243a" id="sec.181-def.forfeitureorder_"><txt break.before="1"><defterm guid="_eb576eb3-37ff-40f7-837e-1c2e40855121" id="sec.181-def.forfeitureorder" type="definition">forfeiture order</defterm> see <intref check="valid" refid="sec.227" target.guid="_0b967d2c-8acb-46fa-9c9b-7f7b347ea5d9">section 227</intref><intref check="valid" refid="sec.227-ssec.1" target.guid="_3b328e4a-b50b-47a3-9aec-d9db2a4de8e3">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_0355807d-96eb-4ef8-a1a8-61c0b9caadb4" id="sec.181-def.formerowner_"><txt break.before="1"><defterm guid="_d785078e-2857-44f1-bc75-227c4a330612" id="sec.181-def.formerowner" type="definition">former owner</defterm> see <intref check="valid" refid="sec.226" target.guid="_0ff4a4cb-5e74-4574-bf03-89ab4e4620a7">section 226</intref><intref check="valid" refid="sec.226-ssec.1" target.guid="_44593fde-1991-4520-942a-04b1e3b280bb">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_8d328c44-95be-4fdc-9493-a28ae7f42353" id="sec.181-def.generalpower_"><txt break.before="1"><defterm guid="_46c8b7b1-c5fb-4faf-9784-a0c53015ab34" id="sec.181-def.generalpower" type="definition">general power</defterm> see <intref check="valid" refid="sec.211" target.guid="_84b703a4-9f2d-4e8d-8943-e424fd026b21">section 211</intref><intref check="valid" refid="sec.211-ssec.1" target.guid="_c238211c-6d13-4e6b-98de-46ade3baf21d">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_9e78da0f-f5de-4bc5-b0a4-b232beaa5a62" id="sec.181-def.helprequirement_"><txt break.before="1"><defterm guid="_06bd1a27-3d43-4812-9b02-0aa159576f85" id="sec.181-def.helprequirement" type="definition">help requirement</defterm> see <intref check="valid" refid="sec.212" target.guid="_f22ebbec-1c50-44f2-a8cf-beb906b42077">section 212</intref><intref check="valid" refid="sec.212-ssec.1" target.guid="_4865b90a-a853-4d52-98d0-c9f0b7cfabe1">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_e6862c29-811b-4365-a0a3-44646b6ebf1d" id="sec.181-def.identitycard_"><txt break.before="1"><defterm guid="_9c9f6156-b02e-447a-8c67-9c897eec851b" id="sec.181-def.identitycard" type="definition">identity card</defterm>, for a provision about authorised persons, means an identity card issued under <intref check="valid" refid="sec.187" target.guid="_f6d5edb4-92d2-46ea-aef2-d6a79a808464">section 187</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_cb2e86ff-e56b-4b32-84ef-6d574e20f525" id="sec.181-def.informationrequirement_"><txt break.before="1"><defterm guid="_8eee167e-f081-4c85-ad67-6e937af02cc0" id="sec.181-def.informationrequirement" type="definition">information requirement</defterm> see <intref check="valid" refid="sec.237" target.guid="_d177b638-c589-47aa-a23b-7a92dec8bcb1">section 237</intref><intref check="valid" refid="sec.237-ssec.3" target.guid="_d52f04f9-9b56-42bd-8f51-19ecf539a12a">(3)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_7e639998-7511-4641-a68b-b1199455e271" id="sec.181-def.offencewarning_"><txt break.before="1"><defterm guid="_e2e08939-d358-4083-9441-96902111d1ec" id="sec.181-def.offencewarning" type="definition">offence warning</defterm>, for a direction or requirement of an authorised person, means a warning that, without reasonable excuse, it is an offence for the person to whom the direction or requirement is made not to comply with it.</txt></definition><definition affected.by.uncommenced="0" guid="_58a6e0aa-5b25-4c27-96b5-567f3487a95d" id="sec.181-def.owner_"><txt break.before="1"><defterm guid="_4e68644d-023e-4a5d-99d9-51b9d2d1825f" id="sec.181-def.owner" type="definition">owner</defterm>, for a thing that has been seized under this chapter, includes a person who would be entitled to possession of the thing had it not been seized.</txt></definition><definition affected.by.uncommenced="0" guid="_85ad6096-eb1a-4381-8ec8-1d6bae38eb57" id="sec.181-def.personaldetailsrequirement_"><txt break.before="1"><defterm guid="_ecde4c86-e99f-4304-9bf3-22575dde42ac" id="sec.181-def.personaldetailsrequirement" type="definition">personal details requirement</defterm> see <intref check="valid" refid="sec.232" target.guid="_66fc4434-714f-4621-abf6-e2851b9852c4">section 232</intref><intref check="valid" refid="sec.232-ssec.5" target.guid="_0dee309b-b712-42df-9429-d0d08420b311">(5)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_1e2d3161-13a2-444f-ad6f-15501c0b8669" id="sec.181-def.personincontrol_"><txt break.before="1"><defterm guid="_b3b55adb-6a6f-4d48-af37-ce7ec6146d33" id="sec.181-def.personincontrol" type="definition">person in control</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e6796a2e-15b0-4a3b-bfde-ceb971222e87" id="sec.181-def.personincontrol-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">of a vehicle, includes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fcbc5859-4395-4b5d-8e33-be45dfcd6a6c" id="sec.181-def.personincontrol-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the vehicle’s driver or rider; and</txt></block></li><li guid="_f4ce6e2e-a3d4-400a-a590-5e01a39b0546" id="sec.181-def.personincontrol-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">anyone who reasonably appears to be, claims to be, or acts as if he or she is, the vehicle’s driver or rider or the person in control of the vehicle; or</txt></block></li></list></block></li><li guid="_3e0cc0ab-59bc-4efb-ae19-668f27078393" id="sec.181-def.personincontrol-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">of another thing, includes anyone who reasonably appears to be, claims to be, or acts as if he or she is, the person in possession or control of the thing.</txt></block></li></list></definition></deflist></block></clause></part><part affected.by.uncommenced="0" guid="_e398e927-507f-4072-83c5-63b44a5b4088" id="ch.10-pt.2"><no>Part 2</no><heading guid="_b5248fa8-1cc6-433f-ad11-7df4595686c8" id="ch.10-pt.2-he">General matters about authorised persons</heading><division affected.by.uncommenced="0" guid="_754a67db-77ce-4411-a534-e1c11d65ccd8" id="ch.10-pt.2-div.1"><no>Division 1</no><heading guid="_e25c6756-7408-4a51-b780-583f9f31f1a8" id="ch.10-pt.2-div.1-he">Functions</heading><clause affected.by.uncommenced="0" guid="_75442da0-1ab4-42c0-ae26-be1b7e5f66ba" id="sec.182" provision.type="other" spent.amends="0"><no>182</no><heading guid="_8123b535-f15a-4a65-b753-6c530f6d5488" id="sec.182-he">Functions of authorised persons</heading><block><txt break.before="1">An authorised person has the following functions—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9820d421-b547-4d67-a25e-5782e8f7b782" id="sec.182-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to investigate, monitor and enforce compliance with this Act;</txt></block></li><li guid="_70d639d4-3a77-429f-8cc4-ba3fbf3f46aa" id="sec.182-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to investigate or monitor whether an occasion has arisen for the exercise of powers under this Act;</txt></block></li><li guid="_898d881c-ca3c-495d-9ccf-ee60f665732f" id="sec.182-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">to facilitate the exercise of powers under this Act.</txt></block></li></list></block></clause></division><division affected.by.uncommenced="0" guid="_8c7a26d4-5fce-4cca-8535-a018eb242ce3" id="ch.10-pt.2-div.2"><no>Division 2</no><heading guid="_50844691-f751-4782-80ac-1c35c00d3e61" id="ch.10-pt.2-div.2-he">Appointment</heading><clause affected.by.uncommenced="0" guid="_1f4c9ac4-6b2d-48ba-9c8c-dcb73e1a9212" id="sec.183" provision.type="other" spent.amends="0"><no>183</no><heading guid="_806d68f5-fc0c-43d0-b9de-2eb7baf391c2" id="sec.183-he">Appointment and qualifications</heading><subclause affected.by.uncommenced="0" guid="_5b78056b-7029-4e9c-afa4-8dda38f38e79" id="sec.183-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may, by instrument in writing, appoint any of the following persons as an authorised person—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e46fd8c6-d3ba-4e2f-b324-499a2f3acf9f" id="sec.183-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a public service officer;</txt></block></li><li guid="_4286e7a4-36bd-4c64-819f-92d16eafb0fb" id="sec.183-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an employee of the department;</txt></block></li><li guid="_63620b17-1825-4c33-86e1-c6446ee31a36" id="sec.183-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a person prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_cacc7ba2-daf1-43c6-92fa-46fdf85f1b51" id="sec.183-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the chief executive may appoint a person as an authorised person only if the chief executive is satisfied the person is qualified for appointment because the person has the necessary expertise or experience.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_5ca3a6ab-d94f-46b9-ac10-2522125e5697" id="sec.184" provision.type="other" spent.amends="0"><no>184</no><heading guid="_26cb5d5c-ae75-405d-bc51-81251659f1df" id="sec.184-he">Appointment conditions and limit on powers</heading><subclause affected.by.uncommenced="0" guid="_85a20e34-892c-42a7-ad5a-1aca7a82b7bd" id="sec.184-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An authorised person holds office on any conditions stated in—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b8350912-a499-48e0-afe2-deebdde673dd" id="sec.184-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the authorised person’s instrument of appointment; or</txt></block></li><li guid="_e2ed7d72-d2bd-4507-86c8-20d782eaa47f" id="sec.184-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a signed notice given to the authorised person; or</txt></block></li><li guid="_e5a5484a-e164-4012-ab6a-fc83f5fe22e4" id="sec.184-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_eec3e022-7c93-4394-9fb1-a546fe43abf3" id="sec.184-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The instrument of appointment, a signed notice given to the authorised person or a regulation may limit the authorised person’s powers.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9f65fe67-9e19-49de-a359-2b39b67d0efc" id="sec.184-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_9d39e046-ebd5-47d5-a8ab-c4b1a476204d" id="sec.184-ssec.3-def.signednotice_"><txt break.before="1"><defterm guid="_ea7f8b11-a15f-477e-9764-8fc8f0497f95" id="sec.184-ssec.3-def.signednotice" type="definition">signed notice</defterm> means a notice signed by the chief executive.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_755639f3-8639-410f-bc88-72cc39b25248" id="sec.185" provision.type="other" spent.amends="0"><no>185</no><heading guid="_e9fcef17-afd9-43bb-a7ea-be7ca02103f6" id="sec.185-he">When office ends</heading><subclause affected.by.uncommenced="0" guid="_27a9a041-1804-4c59-85cd-d9e41980615c" id="sec.185-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The office of a person as an authorised person ends if any of the following happens—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_be82ac33-1283-4ec8-93b2-f6055679f388" id="sec.185-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the term of office stated in a condition of office ends;</txt></block></li><li guid="_f1e29102-d786-4d3e-8186-37195f6f0ebe" id="sec.185-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">under another condition of office, the office ends;</txt></block></li><li guid="_b5c5e61f-972c-4966-b73a-ae33e818fd17" id="sec.185-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the authorised person’s resignation under <intref check="valid" refid="sec.186" target.guid="_bf7de9ce-b1d8-43af-882b-c1aa2c3bb4ca">section 186</intref> takes effect.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_af64d22c-3133-4c28-ad97-678b3023848f" id="sec.185-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.185-ssec.1" target.guid="_27a9a041-1804-4c59-85cd-d9e41980615c">Subsection (1)</intref> does not limit the ways the office of a person as an authorised person ends.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4fd7ad04-13e5-408a-bdd2-513a6995c826" id="sec.185-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_51bc5a90-7d99-4c05-968f-581854acd6b3" id="sec.185-ssec.3-def.conditionofoffice_"><txt break.before="1"><defterm guid="_fc8e3250-7a36-4069-b5ba-f0fba3ee55a3" id="sec.185-ssec.3-def.conditionofoffice" type="definition">condition of office</defterm> means a condition under which the authorised person holds office.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_bf7de9ce-b1d8-43af-882b-c1aa2c3bb4ca" id="sec.186" provision.type="other" spent.amends="0"><no>186</no><heading guid="_b9a88025-00d8-44c0-812c-5204c49426b9" id="sec.186-he">Resignation</heading><subclause affected.by.uncommenced="0" guid="_457a6381-77e3-4284-9595-dbabb1ada1aa" id="sec.186-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An authorised person may resign by signed notice given to the chief executive.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_dd15c768-57e1-49ca-9adc-aae8cb5b8351" id="sec.186-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if holding office as an authorised person is a condition of the authorised person holding another office, the authorised person may not resign as an authorised person without resigning from the other office.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_5d761784-bded-4f93-993d-d341dc4d280a" id="ch.10-pt.2-div.3"><no>Division 3</no><heading guid="_1fd4f338-947c-4199-8f61-b6092c5d5a8b" id="ch.10-pt.2-div.3-he">Identity cards</heading><clause affected.by.uncommenced="0" guid="_f6d5edb4-92d2-46ea-aef2-d6a79a808464" id="sec.187" provision.type="other" spent.amends="0"><no>187</no><heading guid="_a270672e-c1cc-4945-8aa3-ca2ce63d2709" id="sec.187-he">Issue of identity card</heading><subclause affected.by.uncommenced="0" guid="_77371439-7ff8-4d5d-8379-f5e8c7e3437d" id="sec.187-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must issue an identity card to each authorised person.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_687a6135-2857-4792-9aef-76d44461027b" id="sec.187-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The identity card must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d241d81f-dca2-42b5-baf7-5571a20dce73" id="sec.187-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">contain a recent photo of the authorised person; and</txt></block></li><li guid="_b4cd4ecc-4006-4c53-bc98-8a7a294ee7e3" id="sec.187-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">contain a copy of the authorised person’s signature; and</txt></block></li><li guid="_89651064-7c35-448d-a501-e55d40fb2fa3" id="sec.187-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">identify the person as an authorised person under this Act; and</txt></block></li><li guid="_32273322-8071-4166-866f-98fdc4e15ead" id="sec.187-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">state an expiry date for the card.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c41a7c34-2efe-404c-b85f-8bd0babcbd85" id="sec.187-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">This section does not prevent the issue of a single identity card to a person for this Act and other purposes.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_45fe7dfb-d0dd-4f6c-950c-0410bab638f6" id="sec.188" provision.type="other" spent.amends="0"><no>188</no><heading guid="_deb3df36-8d7e-457e-977b-e250f5109a56" id="sec.188-he">Production or display of identity card</heading><subclause affected.by.uncommenced="0" guid="_1221fb99-13d4-4e89-bd90-597aec0bd685" id="sec.188-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">In exercising a power in relation to a person in the person’s presence, an authorised person must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9be99ffa-017b-49f6-a49e-b6c9877ad1fa" id="sec.188-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">produce the authorised person’s identity card for the person’s inspection before exercising the power; or</txt></block></li><li guid="_853c6854-0def-4b11-8755-f35ea9ea579f" id="sec.188-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">have the identity card displayed so it is clearly visible to the person when exercising the power.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0770d5e0-6cb4-40c3-8f8c-c82958356e55" id="sec.188-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if it is not practicable to comply with <intref check="valid" refid="sec.188-ssec.1" target.guid="_1221fb99-13d4-4e89-bd90-597aec0bd685">subsection (1)</intref>, the authorised person must produce the identity card for the person’s inspection at the first reasonable opportunity.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_236f5b9a-4660-48a8-8252-c0b00d0b2878" id="sec.188-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For <intref check="valid" refid="sec.188-ssec.1" target.guid="_1221fb99-13d4-4e89-bd90-597aec0bd685">subsection (1)</intref>, an authorised person does not exercise a power in relation to a person only because the authorised person has entered a place as mentioned in <intref check="valid" refid="sec.192" target.guid="_6181924e-a9d4-4366-8e35-9bd0a5179a1e">section 192</intref><intref check="valid" refid="sec.192-ssec.1" target.guid="_a133fe7b-f799-4677-95f4-431f879f0d67">(1)</intref><intref check="valid" refid="sec.192-ssec.1-para1.a" target.guid="_0f32ded9-5f46-4322-8c52-a8e1f1389115">(a)</intref><intref check="valid" refid="sec.192-ssec.1-para1.a-para2.iii" target.guid="_987217fd-e613-4e33-b142-a222ce4d58c4">(iii)</intref>, <intref check="valid" refid="sec.192-ssec.1-para1.a-para2.iv" target.guid="_a603a03c-e8b1-42d1-8f8e-b4f7bd9570ef">(iv)</intref> or <intref check="valid" refid="sec.192-ssec.1-para1.a-para2.v" target.guid="_131d2e60-87c3-40a2-975b-07dfab4f0465">(v)</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7d6936dd-5aaf-49f0-9058-a44588f7b481" id="sec.189" provision.type="other" spent.amends="0"><no>189</no><heading guid="_204bfd42-7f2d-4422-abc0-9157a2ff1817" id="sec.189-he">Return of identity card</heading><block><txt break.before="1">If the office of a person as an authorised person ends, the person must return the person’s identity card to the chief executive within 21 days after the office ends unless the person has a reasonable excuse.</txt></block><penalty guid="_cfcecf9b-c53e-46cb-8615-ff3351df20a0" id="sec.189-pen"><block><txt break.before="1">Maximum penalty—50 penalty units.</txt></block></penalty></clause></division><division affected.by.uncommenced="0" guid="_92f2e05d-40a6-4889-b4d8-23785333656e" id="ch.10-pt.2-div.4"><no>Division 4</no><heading guid="_7b9b6347-1d46-4591-a4a2-bb876ab7506b" id="ch.10-pt.2-div.4-he">Miscellaneous provisions</heading><clause affected.by.uncommenced="0" guid="_0d2953ca-ffd9-47a2-8754-042a10d80999" id="sec.190" provision.type="other" spent.amends="0"><no>190</no><heading guid="_a4e5cdec-eff4-42d7-b4ed-47c0ea6796db" id="sec.190-he">References to exercise of powers</heading><block><txt break.before="1">If—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b482dc6f-2097-4047-851d-a8c495968d53" id="sec.190-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a provision of this chapter refers to the exercise of a power by an authorised person; and</txt></block></li><li guid="_8e04b21d-1d45-41dd-a516-8c1a4f4d8ec3" id="sec.190-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">there is no reference to a specific power;</txt></block></li></list></block><block><txt break.before="1">the reference is to the exercise of all or any authorised persons’ powers under this chapter or a warrant, to the extent the powers are relevant.</txt></block></clause><clause affected.by.uncommenced="0" guid="_1ab691bb-cfae-4bb7-98d9-18f7f03bd43b" id="sec.191" provision.type="other" spent.amends="0"><no>191</no><heading guid="_424e2853-d872-422d-b9ed-be52b55d5f13" id="sec.191-he">Reference to document includes reference to reproductions from electronic document</heading><block><txt break.before="1">A reference in this chapter to a document includes a reference to an image or writing—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_724b8744-05af-4b17-bc9c-40cb0deeecbe" id="sec.191-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">produced from an electronic document; or</txt></block></li><li guid="_19bb3c3a-8d4b-4f74-9267-ebb396f34e2d" id="sec.191-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">not yet produced, but reasonably capable of being produced, from an electronic document, with or without the aid of another article or device.</txt></block></li></list></block></clause></division></part><part affected.by.uncommenced="0" guid="_2b5e680f-2cac-4465-93eb-1bbfd3eeb5ef" id="ch.10-pt.3"><no>Part 3</no><heading guid="_32b267a0-ff44-47b7-bdd0-4f584f65a525" id="ch.10-pt.3-he">Entry of places by authorised persons</heading><division affected.by.uncommenced="0" guid="_a5aa6f0a-d8ab-400b-abc6-32300a59bed7" id="ch.10-pt.3-div.1"><no>Division 1</no><heading guid="_97b3038a-5dec-49a5-a15c-35c0ef660b19" id="ch.10-pt.3-div.1-he">Power to enter</heading><clause affected.by.uncommenced="0" guid="_6181924e-a9d4-4366-8e35-9bd0a5179a1e" id="sec.192" provision.type="other" spent.amends="0"><no>192</no><heading guid="_0d00d068-0f04-453e-af43-d74a18e212c1" id="sec.192-he">General power to enter places</heading><subclause affected.by.uncommenced="0" guid="_a133fe7b-f799-4677-95f4-431f879f0d67" id="sec.192-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An authorised person may enter a place—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0f32ded9-5f46-4322-8c52-a8e1f1389115" id="sec.192-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a70bea4f-0f91-49c1-81d4-10eda3630054" id="sec.192-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">an occupier of the place consents under <intref check="valid" refid="ch.10-pt.3-div.2" target.guid="_9b3fd058-7804-41e6-bc60-7cbf7bbe62d1">division 2</intref> to the entry and <intref check="valid" refid="sec.195" target.guid="_221c51d4-c6d1-4baf-a42a-ce47cef39b8a">section 195</intref> has been complied with for the occupier; or</txt></block></li><li guid="_9c78d8b0-8385-4443-a193-1b69f0a6822d" id="sec.192-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the entry is authorised under a warrant and, if there is an occupier of the place, <intref check="valid" refid="ch.10-pt.3-div.3" target.guid="_e7a192ef-7fcf-4631-b2f7-6341045641be">division 3</intref>, <intref check="valid" refid="ch.10-pt.3-div.3-sdiv.2" target.guid="_5979fdd2-098f-4236-84aa-0cc4d6fbdd9f">subdivision 2</intref> has been complied with for the occupier; or</txt></block></li><li guid="_987217fd-e613-4e33-b142-a222ce4d58c4" id="sec.192-ssec.1-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">it is a public place and the entry is made when it is open to the public; or</txt></block></li><li guid="_a603a03c-e8b1-42d1-8f8e-b4f7bd9570ef" id="sec.192-ssec.1-para1.a-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">it is a place of business that is open for carrying on the business; or</txt></block></li><li guid="_131d2e60-87c3-40a2-975b-07dfab4f0465" id="sec.192-ssec.1-para1.a-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">it is vacant land in relation to which the authorised person reasonably suspects an offence against <intref check="valid" refid="sec.103" target.guid="_88ee3b31-e48a-4927-89f5-5ffb72f072b6">section 103</intref><intref check="valid" refid="sec.103-ssec.1" target.guid="_955200d4-8fb9-4cae-9c63-97b3252973a4">(1)</intref> or <intref check="valid" refid="sec.104" target.guid="_428f4a48-281f-4088-8124-b981fb6fd86a">104</intref><intref check="valid" refid="sec.104-ssec.1" target.guid="_d4b52884-8745-4059-bece-7159bd221cc0">(1)</intref> has been or is being committed; or</txt></block></li></list></block></li><li guid="_709753df-5ffa-4b77-8b92-1a2e543c0b3c" id="sec.192-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if it is a waste facility and entry is made during the daytime; or</txt></block></li><li guid="_e9a178a2-9ff2-4212-bda3-db1aba15747c" id="sec.192-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">under <intref check="valid" refid="sec.204" target.guid="_b9fe0eb7-d6f8-44d5-a902-d1361707f25a">section 204</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2563deaf-4aef-44b6-98b9-20304db9acae" id="sec.192-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.192-ssec.1" target.guid="_a133fe7b-f799-4677-95f4-431f879f0d67">Subsection (1)</intref><intref check="valid" refid="sec.192-ssec.1-para1.a" target.guid="_0f32ded9-5f46-4322-8c52-a8e1f1389115">(a)</intref><intref check="valid" refid="sec.192-ssec.1-para1.a-para2.iv" target.guid="_a603a03c-e8b1-42d1-8f8e-b4f7bd9570ef">(iv)</intref> is not limited by <intref check="valid" refid="sec.192-ssec.1" target.guid="_a133fe7b-f799-4677-95f4-431f879f0d67">subsection (1)</intref><intref check="valid" refid="sec.192-ssec.1-para1.b" target.guid="_709753df-5ffa-4b77-8b92-1a2e543c0b3c">(b)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_39588fac-f4df-4f54-9bff-c1f74dd34238" id="sec.192-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0"><intref check="valid" refid="sec.192-ssec.1" target.guid="_a133fe7b-f799-4677-95f4-431f879f0d67">Subsection (1)</intref><intref check="valid" refid="sec.192-ssec.1-para1.a" target.guid="_0f32ded9-5f46-4322-8c52-a8e1f1389115">(a)</intref><intref check="valid" refid="sec.192-ssec.1-para1.a-para2.iv" target.guid="_a603a03c-e8b1-42d1-8f8e-b4f7bd9570ef">(iv)</intref> or (b) does not authorise entry to any part of the place where a person resides.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_327e1973-3070-4b4d-80f5-4d78a72f02e7" id="sec.192-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the power to enter arose only because an occupier of the place consented to the entry, the power is subject to any conditions of the consent and ceases if the consent is withdrawn.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5a629edd-94a9-47c1-812d-d6f59b91392d" id="sec.192-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the power to enter is under a warrant, the power is subject to the terms of the warrant.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9f164191-4035-4524-938b-46570fd28c5c" id="sec.192-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">If the power to enter arose only because an occupier of the place consented to the entry, the consent may provide consent for re-entry and is subject to the conditions of consent.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4bc62dd4-a348-4298-b13a-5e83145af91e" id="sec.192-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">If the power to enter is under a warrant, the re-entry is subject to the terms of the warrant.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_07f66c9d-1d36-4c29-8a05-28338b86cf5a" id="sec.192-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_bb384c5c-1e68-4ce3-9722-9a487070dd49" id="sec.192-ssec.8-def.vacantland_"><txt break.before="1"><defterm guid="_6d43b044-dd99-444b-adc8-4f687e2e9869" id="sec.192-ssec.8-def.vacantland" type="definition">vacant land</defterm> means land on which there are no structural improvements other than fencing.</txt></definition></deflist></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_9b3fd058-7804-41e6-bc60-7cbf7bbe62d1" id="ch.10-pt.3-div.2"><no>Division 2</no><heading guid="_c7bce262-ca9a-406f-a453-8b2218641021" id="ch.10-pt.3-div.2-he">Entry by consent</heading><clause affected.by.uncommenced="0" guid="_2acb66ed-9699-41e8-b061-be12859de55b" id="sec.193" provision.type="other" spent.amends="0"><no>193</no><heading guid="_51477fb7-a26e-471b-96be-f04631cee212" id="sec.193-he">Application of <intref check="valid" refid="ch.10-pt.3-div.2" target.guid="_9b3fd058-7804-41e6-bc60-7cbf7bbe62d1">div 2</intref></heading><block><txt break.before="1">This division applies if an authorised person intends to ask an occupier of a place for consent to the authorised person or another authorised person entering the place under <intref check="valid" refid="sec.192" target.guid="_6181924e-a9d4-4366-8e35-9bd0a5179a1e">section 192</intref><intref check="valid" refid="sec.192-ssec.1" target.guid="_a133fe7b-f799-4677-95f4-431f879f0d67">(1)</intref><intref check="valid" refid="sec.192-ssec.1-para1.a" target.guid="_0f32ded9-5f46-4322-8c52-a8e1f1389115">(a)</intref><intref check="valid" refid="sec.192-ssec.1-para1.a-para2.i" target.guid="_a70bea4f-0f91-49c1-81d4-10eda3630054">(i)</intref>.</txt></block></clause><clause affected.by.uncommenced="0" guid="_a4b8e53a-bf0c-4267-ba9b-c43cf147e3b3" id="sec.194" provision.type="other" spent.amends="0"><no>194</no><heading guid="_2dd10360-cd5e-4f40-9df4-5c954ae5cb85" id="sec.194-he">Incidental entry to ask for access</heading><block><txt break.before="1">For the purpose of asking the occupier for the consent, the authorised person may, without the occupier’s consent or a warrant—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ddbb700f-b256-4f29-9531-7d6c7d3911bd" id="sec.194-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">enter land around premises at the place to an extent that is reasonable to contact the occupier; or</txt></block></li><li guid="_8c4d1d86-a701-4e68-8f77-04e2529fba0b" id="sec.194-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">enter part of the place the authorised person reasonably considers members of the public ordinarily are allowed to enter when they wish to contact an occupier of the place.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_221c51d4-c6d1-4baf-a42a-ce47cef39b8a" id="sec.195" provision.type="other" spent.amends="0"><no>195</no><heading guid="_a84c52aa-6c8f-4566-b5c9-d75bf3f82d34" id="sec.195-he">Matters authorised person must tell occupier</heading><block><txt break.before="1">Before asking for the consent, the authorised person must give a reasonable explanation to the occupier—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3a2b1811-a1da-42e9-901b-624bd4a518d0" id="sec.195-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">about the purpose of the entry, including the powers intended to be exercised; and</txt></block></li><li guid="_daa29c75-0fb4-4710-9ad6-bdfc73c66a81" id="sec.195-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that the occupier is not required to consent; and</txt></block></li><li guid="_3edaecc4-1036-44fa-93b9-874f428ace08" id="sec.195-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that the consent may be given subject to conditions and may be withdrawn at any time.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_bb8a6195-080f-4d2d-b970-f8c054d0b441" id="sec.196" provision.type="other" spent.amends="0"><no>196</no><heading guid="_2c9a3837-ffeb-4693-b520-784655038691" id="sec.196-he">Consent acknowledgement</heading><subclause affected.by.uncommenced="0" guid="_0ebd4ef2-e8fc-4700-9b08-0746db8b48a6" id="sec.196-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the consent is given, the authorised person may ask the occupier to sign an acknowledgement of the consent.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7a226510-d959-4d83-98e8-3a52eaf5b978" id="sec.196-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The acknowledgement must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_68f012fb-0c73-4713-9f01-0216f0efb82a" id="sec.196-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the purpose of the entry, including the powers intended to be exercised; and</txt></block></li><li guid="_5f6e722a-b816-4518-9a85-c1e1ae9ac9eb" id="sec.196-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the following has been explained to the occupier—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2d9f2074-5115-4b47-8df3-bbd3f8db7950" id="sec.196-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the purpose of the entry, including the powers intended to be exercised;</txt></block></li><li guid="_034bf358-4766-4825-9442-d3bd695b887d" id="sec.196-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">that the occupier is not required to consent;</txt></block></li><li guid="_3bfa8951-5f4d-442d-a48e-629913f90f16" id="sec.196-ssec.2-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">that the consent may be given subject to conditions and may be withdrawn at any time; and</txt></block></li></list></block></li><li guid="_2734daf4-d018-4def-8c20-3e2532f08e55" id="sec.196-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the occupier gives the authorised person or another authorised person consent to enter the place and exercise the powers; and</txt></block></li><li guid="_617b22b3-ca79-4fd4-ab50-ef26fcdbc073" id="sec.196-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the time and day the consent was given; and</txt></block></li><li guid="_b9269288-588d-4493-b6a5-b14f648bd295" id="sec.196-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">any conditions of the consent.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_af3ab2e5-7522-46a7-8c39-d8e4bb2e33f8" id="sec.196-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the occupier signs the acknowledgement, the authorised person must immediately give a copy to the occupier.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_adba1a6d-9760-4a73-a488-647093c8c720" id="sec.196-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, if it is impractical for the authorised person to give the occupier a copy of the acknowledgement immediately, the authorised person must give the copy as soon as practicable.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_70e99b23-37de-4093-9a1f-66c8c56dccac" id="sec.196-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_43794e53-00e5-469c-9850-dcdf0ebe84d2" id="sec.196-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an issue arises in a proceeding about whether the occupier consented to the entry; and</txt></block></li><li guid="_f16ae402-2d2e-4027-9107-51a1d1000ea0" id="sec.196-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an acknowledgement complying with <intref check="valid" refid="sec.196-ssec.2" target.guid="_7a226510-d959-4d83-98e8-3a52eaf5b978">subsection (2)</intref> for the entry is not produced in evidence;</txt></block></li></list></block><block><txt break.before="1">the onus of proof is on the person relying on the lawfulness of the entry to prove the occupier consented.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_e7a192ef-7fcf-4631-b2f7-6341045641be" id="ch.10-pt.3-div.3"><no>Division 3</no><heading guid="_f987c593-b170-4f62-9a59-3a9ae6ca9847" id="ch.10-pt.3-div.3-he">Entry under warrant</heading><subdivision affected.by.uncommenced="0" guid="_43f6904e-4a22-46a7-ad5b-49c8add9c2ee" id="ch.10-pt.3-div.3-sdiv.1"><no>Subdivision 1</no><heading guid="_cca38e79-6b67-4857-bc53-f1a4cdd2d63f" id="ch.10-pt.3-div.3-sdiv.1-he">Obtaining warrant</heading><clause affected.by.uncommenced="0" guid="_7a248f4e-31ca-4bb5-ac33-318cfe5f9274" id="sec.197" provision.type="other" spent.amends="0"><no>197</no><heading guid="_b70ae196-aaa5-41f6-a9f5-2dd89e10b3ca" id="sec.197-he">Application for warrant</heading><subclause affected.by.uncommenced="0" guid="_7e996e4d-fe00-48c1-80e1-dc56dbf9fb81" id="sec.197-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An authorised person may apply to a magistrate for a warrant for a place.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_61301775-fd58-4932-b083-f6971a1c24de" id="sec.197-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The authorised person must prepare a written application that states the grounds on which the warrant is sought.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_13e8deb4-35a1-4222-9ab2-19f8957d445e" id="sec.197-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The written application must be sworn.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d5b8c8cc-d71c-4cfc-a091-ddcbf11df3a1" id="sec.197-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The magistrate may refuse to consider the application until the authorised person gives the magistrate all the information the magistrate requires about the application in the way the magistrate requires.</txt><note guid="_6b98ad3e-b5c6-431e-b3b2-75a63c7cdfeb" id="sec.197-ssec.4-note" type="example"><heading guid="_22745cbd-9203-4444-93ce-d1c4f03c2207" id="sec.197-ssec.4-note-he">Example—</heading><block><txt break.before="1">The magistrate may require additional information supporting the written application to be given by statutory declaration.</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_ad99e76b-0ca2-48b3-b729-7ddd49c31de5" id="sec.198" provision.type="other" spent.amends="0"><no>198</no><heading guid="_e74a88fa-0902-4c19-86f0-7179943e9be5" id="sec.198-he">Issue of warrant</heading><subclause affected.by.uncommenced="0" guid="_601ed566-1fec-4a8e-b66f-9e63563c67b9" id="sec.198-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The magistrate may issue a warrant for the place if the magistrate is satisfied there are reasonable grounds for suspecting that there is at the place, or will be at the place within the next 7 days, a particular thing or activity that may provide evidence of an offence against this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9df6ec4e-3c51-408d-8c99-4ace84145a56" id="sec.198-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The warrant must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_933b08ce-910c-4c39-9ab3-716301502846" id="sec.198-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the place to which the warrant applies; and</txt></block></li><li guid="_f56c8470-b7ae-48cd-9ca7-2d53ee1c92ae" id="sec.198-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that a stated authorised person or any authorised person may with necessary and reasonable help and force—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6a1c5746-21ec-472b-a69c-d7a221ffd0ea" id="sec.198-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">enter the place and any other place necessary for entry to the place; and</txt></block></li><li guid="_0a72d91c-d053-41c7-8ea7-0099473d13dd" id="sec.198-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">exercise the authorised person’s powers; and</txt></block></li></list></block></li><li guid="_e60d4581-12bc-481d-b632-6628b67961f5" id="sec.198-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">particulars of the offence that the magistrate considers appropriate; and</txt></block></li><li guid="_ca90173a-ab67-4493-b66f-932c6464fdd0" id="sec.198-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the name of the person suspected of having committed the offence unless the name is unknown or the magistrate considers it inappropriate to state the name; and</txt></block></li><li guid="_1f15945c-76a1-4236-9f7b-9b8114eb8ffd" id="sec.198-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the evidence that may be seized under the warrant; and</txt></block></li><li guid="_867df2cc-8fc6-4788-afec-8ccf0591ddff" id="sec.198-ssec.2-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">the hours of the day or night when the place may be entered; and</txt></block></li><li guid="_b75a7a01-3d9a-4397-adce-b7e1bdd92608" id="sec.198-ssec.2-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">the magistrate’s name; and</txt></block></li><li guid="_f6220452-a2b9-4c92-ab4b-cda22220c7a3" id="sec.198-ssec.2-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">the day and time of the warrant’s issue; and</txt></block></li><li guid="_1bde24f0-2c6c-413c-8845-90fe6c4f8d87" id="sec.198-ssec.2-para1.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the day, within 14 days after the warrant’s issue, the warrant ends.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3c4d8621-c3fd-4ed0-8ce8-655a339aa257" id="sec.199" provision.type="other" spent.amends="0"><no>199</no><heading guid="_53c0c8ab-c63a-40c6-8074-34d817bd549a" id="sec.199-he">Electronic application</heading><subclause affected.by.uncommenced="0" guid="_4a3710d5-c509-4b35-be4b-0061fa2ca91c" id="sec.199-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An application under <intref check="valid" refid="sec.197" target.guid="_7a248f4e-31ca-4bb5-ac33-318cfe5f9274">section 197</intref> may be made by phone, fax, email, radio, videoconferencing or another form of electronic communication if the authorised person reasonably considers it necessary because of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c018bb70-23e0-4aa1-a878-f1203a6177a1" id="sec.199-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">urgent circumstances; or</txt></block></li><li guid="_aa9ed7bd-ce87-4d3c-b085-24bc0dae1f7b" id="sec.199-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">other special circumstances, including, for example, the authorised person’s remote location.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_da7e3ae4-ebe6-4a2b-8238-50ce0cc762f3" id="sec.199-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b13155aa-c6c8-41a7-ab8b-e7d6e793a3e6" id="sec.199-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">may not be made before the authorised person prepares the written application under <intref check="valid" refid="sec.197" target.guid="_7a248f4e-31ca-4bb5-ac33-318cfe5f9274">section 197</intref><intref check="valid" refid="sec.197-ssec.2" target.guid="_61301775-fd58-4932-b083-f6971a1c24de">(2)</intref>; but</txt></block></li><li guid="_27882e6c-b59d-436f-beb1-dc15b165d5d7" id="sec.199-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">may be made before the written application is sworn.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0f0ca264-c263-4074-a93d-93cf7bed82e2" id="sec.200" provision.type="other" spent.amends="0"><no>200</no><heading guid="_5190ec25-9b6a-435c-b5d6-de382b755ea8" id="sec.200-he">Additional procedure if electronic application</heading><subclause affected.by.uncommenced="0" guid="_7480df64-2d43-47c8-ac78-95b478bc11ac" id="sec.200-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">For an application made under <intref check="valid" refid="sec.199" target.guid="_3c4d8621-c3fd-4ed0-8ce8-655a339aa257">section 199</intref>, the magistrate may issue the warrant (the <defterm guid="_f407d5c4-97fd-4fbe-b357-be713f89c734" id="sec.200-def.originalwarrant" type="definition">original warrant</defterm>) only if the magistrate is satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_91098d0b-1352-4026-b557-eb9f6f75d256" id="sec.200-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">it was necessary to make the application under <intref check="valid" refid="sec.199" target.guid="_3c4d8621-c3fd-4ed0-8ce8-655a339aa257">section 199</intref>; and</txt></block></li><li guid="_bda8172d-afcd-4516-a68e-282e696051cc" id="sec.200-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the way the application was made under <intref check="valid" refid="sec.199" target.guid="_3c4d8621-c3fd-4ed0-8ce8-655a339aa257">section 199</intref> was appropriate.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_25af3e29-d91c-47cd-bde2-ded84aaeb8f3" id="sec.200-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">After the magistrate issues the original warrant—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_007e00ba-637f-418c-afc6-aae6b7723090" id="sec.200-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if there is a reasonably practicable way of immediately giving a copy of the warrant to the authorised person, including, for example, by sending a copy by fax or email, the magistrate must immediately give a copy of the warrant to the authorised person; or</txt></block></li><li guid="_9f1d9342-e990-4be9-b118-18cc1c7d574a" id="sec.200-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fb7d03ec-4dfc-4645-8c6a-5acc94cda489" id="sec.200-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the magistrate must tell the authorised person the information mentioned in <intref check="valid" refid="sec.198" target.guid="_ad99e76b-0ca2-48b3-b729-7ddd49c31de5">section 198</intref><intref check="valid" refid="sec.198-ssec.2" target.guid="_9df6ec4e-3c51-408d-8c99-4ace84145a56">(2)</intref>; and</txt></block></li><li guid="_a3bd5ad1-77ea-4e63-bab2-72917ef99f31" id="sec.200-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the authorised person must complete a form of warrant, including by writing on it the information mentioned in <intref check="valid" refid="sec.198" target.guid="_ad99e76b-0ca2-48b3-b729-7ddd49c31de5">section 198</intref><intref check="valid" refid="sec.198-ssec.2" target.guid="_9df6ec4e-3c51-408d-8c99-4ace84145a56">(2)</intref> provided by the magistrate.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_521d8234-e0d8-4d89-9534-3e2c1f29730b" id="sec.200-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The copy of the warrant mentioned in <intref check="valid" refid="sec.200-ssec.2" target.guid="_25af3e29-d91c-47cd-bde2-ded84aaeb8f3">subsection (2)</intref><intref check="valid" refid="sec.200-ssec.2-para1.a" target.guid="_007e00ba-637f-418c-afc6-aae6b7723090">(a)</intref>, or the form of warrant completed under <intref check="valid" refid="sec.200-ssec.2" target.guid="_25af3e29-d91c-47cd-bde2-ded84aaeb8f3">subsection (2)</intref><intref check="valid" refid="sec.200-ssec.2-para1.b" target.guid="_9f1d9342-e990-4be9-b118-18cc1c7d574a">(b)</intref> (in either case the <defterm guid="_5d2fcbf2-e966-4644-802e-9b02c51f9d95" id="sec.200-def.duplicatewarrant" type="definition">duplicate warrant</defterm>), is a duplicate of, and as effectual as, the original warrant.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_60d4c1f5-df6e-4724-ab29-559bc63a541c" id="sec.200-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The authorised person must, at the first reasonable opportunity, send to the magistrate—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_be889a44-64f3-4aa6-9a13-e249a08ccec4" id="sec.200-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the written application complying with <intref check="valid" refid="sec.197" target.guid="_7a248f4e-31ca-4bb5-ac33-318cfe5f9274">section 197</intref><intref check="valid" refid="sec.197-ssec.2" target.guid="_61301775-fd58-4932-b083-f6971a1c24de">(2)</intref> and <intref check="valid" refid="sec.197-ssec.3" target.guid="_13e8deb4-35a1-4222-9ab2-19f8957d445e">(3)</intref>; and</txt></block></li><li guid="_ff957b17-f8fb-4262-8f59-1f59aaa58056" id="sec.200-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the authorised person completed a form of warrant under <intref check="valid" refid="sec.200-ssec.2" target.guid="_25af3e29-d91c-47cd-bde2-ded84aaeb8f3">subsection (2)</intref><intref check="valid" refid="sec.200-ssec.2-para1.b" target.guid="_9f1d9342-e990-4be9-b118-18cc1c7d574a">(b)</intref>—the completed form of warrant.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b8233153-c458-47a0-a86f-90a62cf89953" id="sec.200-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The magistrate must keep the original warrant and, on receiving the documents under <intref check="valid" refid="sec.200-ssec.4" target.guid="_60d4c1f5-df6e-4724-ab29-559bc63a541c">subsection (4)</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_21f40e80-f710-4ccb-861d-175ef9aee14e" id="sec.200-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">attach the documents to the original warrant; and</txt></block></li><li guid="_dde21cd5-5156-44c8-90f0-aada167b13cc" id="sec.200-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give the original warrant and documents to the clerk of the court of the relevant magistrates court.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_fc986ec8-dd04-4a16-8937-be7c67665e7f" id="sec.200-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">Despite <intref check="valid" refid="sec.200-ssec.3" target.guid="_521d8234-e0d8-4d89-9534-3e2c1f29730b">subsection (3)</intref>, if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cb99fb8c-8ee6-4564-b563-b2f3bbd607a2" id="sec.200-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an issue arises in a proceeding about whether an exercise of a power was authorised by a warrant issued under this section; and</txt></block></li><li guid="_7ce4b7fc-c10a-488f-9c27-7b5def63a5db" id="sec.200-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the original warrant is not produced in evidence;</txt></block></li></list></block><block><txt break.before="1">the onus of proof is on the person relying on the lawfulness of the exercise of the power to prove a warrant authorised the exercise of the power.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3db33ba9-b49e-40b1-b46b-e03de3770d45" id="sec.200-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">This section does not limit <intref check="valid" refid="sec.197" target.guid="_7a248f4e-31ca-4bb5-ac33-318cfe5f9274">section 197</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3e2a7716-f362-4c0d-97c7-5709940c3beb" id="sec.200-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_b1a75035-dbb5-4d95-8faa-020798c3d220" id="sec.200-ssec.8-def.relevantmagistratescourt_"><txt break.before="1"><defterm guid="_f2e43b23-0a31-4668-83cc-af627c27955f" id="sec.200-ssec.8-def.relevantmagistratescourt" type="definition">relevant magistrates court</defterm>, in relation to a magistrate, means the Magistrates Court that the magistrate constitutes under the <legref check="valid" jurisd="QLD" target.doc.id="act-1991-075" target.version.series="e18c6e91-c9eb-4157-bc83-f3ebffa60949" type="act"><name emphasis="yes">Magistrates Act 1991</name></legref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_19b212a0-21d8-4169-ba67-6fb18054b78c" id="sec.201" provision.type="other" spent.amends="0"><no>201</no><heading guid="_f594136d-721a-41aa-8547-42e4d43afde3" id="sec.201-he">Defect in relation to a warrant</heading><subclause affected.by.uncommenced="0" guid="_67163644-31ce-415d-b3b8-61f031e1651f" id="sec.201-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A warrant is not invalidated by a defect in—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_eb225164-17ea-4227-86e7-78b16d4ddb18" id="sec.201-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the warrant; or</txt></block></li><li guid="_532baec1-0749-49f4-a3cd-d64f209b3779" id="sec.201-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">compliance with this subdivision;</txt></block></li></list></block><block><txt break.before="1">unless the defect affects the substance of the warrant in a material particular.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c3cb1d7b-db82-4783-b097-088607f15d8d" id="sec.201-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_253ed653-60c7-4812-9cc2-b28b3e451f3d" id="sec.201-ssec.2-def.warrant_"><txt break.before="1"><defterm guid="_0f4a74d8-04ad-48dd-882d-a5ed00fbfe3c" id="sec.201-ssec.2-def.warrant" type="definition">warrant</defterm> includes a duplicate warrant mentioned in <intref check="valid" refid="sec.200" target.guid="_0f0ca264-c263-4074-a93d-93cf7bed82e2">section 200</intref><intref check="valid" refid="sec.200-ssec.3" target.guid="_521d8234-e0d8-4d89-9534-3e2c1f29730b">(3)</intref>.</txt></definition></deflist></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_5979fdd2-098f-4236-84aa-0cc4d6fbdd9f" id="ch.10-pt.3-div.3-sdiv.2"><no>Subdivision 2</no><heading guid="_35e0f38e-fbe6-4979-91f9-0248d775919e" id="ch.10-pt.3-div.3-sdiv.2-he">Entry procedure</heading><clause affected.by.uncommenced="0" guid="_5a1a7fdc-d83a-4290-a159-8d0cecb90838" id="sec.202" provision.type="other" spent.amends="0"><no>202</no><heading guid="_9f2c4dd1-f0e9-4d81-b3c8-fa62ecb75a41" id="sec.202-he">Procedure</heading><subclause affected.by.uncommenced="0" guid="_a1772c9e-8f83-4127-bb25-98203b2adfc3" id="sec.202-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if an authorised person is intending to enter a place under a warrant issued under this division.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c49cc309-11c3-47f6-b58a-0922d2e55dea" id="sec.202-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Before entering the place, the authorised person must do or make a reasonable attempt to do the following things—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_639f820a-b57e-42de-95a9-b38852781e02" id="sec.202-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">identify himself or herself to a person who is an occupier of the place and is present by producing the authorised person’s identity card or another document evidencing the authorised person’s appointment;</txt></block></li><li guid="_d61ffc76-1c74-4062-a5c9-5ca7cca43eea" id="sec.202-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give the person a copy of the warrant;</txt></block></li><li guid="_19953c4c-19d4-4aaf-a162-fd50f8b3a664" id="sec.202-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">tell the person the authorised person is permitted by the warrant to enter the place;</txt></block></li><li guid="_44aa8f8a-e4bb-4bd7-9206-63fbfa459d61" id="sec.202-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">give the person an opportunity to allow the authorised person immediate entry to the place without using force.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2864b4a6-9c5c-4ef7-b292-390bd23a4e4a" id="sec.202-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the authorised person need not comply with <intref check="valid" refid="sec.202-ssec.2" target.guid="_c49cc309-11c3-47f6-b58a-0922d2e55dea">subsection (2)</intref> if the authorised person reasonably believes that entry to the place is required to ensure the execution of the warrant is not frustrated.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f9c8fb3e-ae93-4118-afa2-68fc932562e2" id="sec.202-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_b35c0d43-ae8a-424d-9dd1-159c5a965612" id="sec.202-ssec.4-def.warrant_"><txt break.before="1"><defterm guid="_e7bcc8e4-3490-45b7-9fe3-40faca5788b4" id="sec.202-ssec.4-def.warrant" type="definition">warrant</defterm> includes a duplicate warrant mentioned in <intref check="valid" refid="sec.200" target.guid="_0f0ca264-c263-4074-a93d-93cf7bed82e2">section 200</intref><intref check="valid" refid="sec.200-ssec.3" target.guid="_521d8234-e0d8-4d89-9534-3e2c1f29730b">(3)</intref>.</txt></definition></deflist></block></subclause></clause></subdivision></division><division affected.by.uncommenced="0" guid="_c1e52fb7-802c-4118-ab9c-7d3fd5901571" id="ch.10-pt.3-div.4"><no>Division 4</no><heading guid="_45ccc0e1-a2ad-48f9-b892-84f0f45d3b82" id="ch.10-pt.3-div.4-he">Procedure for certain other entries</heading><clause affected.by.uncommenced="0" guid="_cc25d89e-9b95-4049-9be6-1faf26c1046a" id="sec.203" provision.type="other" spent.amends="0"><no>203</no><heading guid="_6fe9c9af-b185-4c31-8d72-e40cdb07a880" id="sec.203-he">Procedure</heading><subclause affected.by.uncommenced="0" guid="_fe5e4d46-8b47-4e7c-8fcc-8640ea124e45" id="sec.203-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f4b00913-6fc9-450f-8f55-c6c24ae46dff" id="sec.203-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an authorised person is intending to enter a place under <intref check="valid" refid="sec.192" target.guid="_6181924e-a9d4-4366-8e35-9bd0a5179a1e">section 192</intref><intref check="valid" refid="sec.192-ssec.1" target.guid="_a133fe7b-f799-4677-95f4-431f879f0d67">(1)</intref><intref check="valid" refid="sec.192-ssec.1-para1.a" target.guid="_0f32ded9-5f46-4322-8c52-a8e1f1389115">(a)</intref><intref check="valid" refid="sec.192-ssec.1-para1.a-para2.iv" target.guid="_a603a03c-e8b1-42d1-8f8e-b4f7bd9570ef">(iv)</intref> or (b); and</txt></block></li><li guid="_ba991b6e-8cae-4322-9565-0662dc098520" id="sec.203-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an occupier of the place is present at the place.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_64aea589-92ae-498b-9738-96629ab6ee27" id="sec.203-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Before entering the place, the authorised person must do or make a reasonable attempt to do the following things—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c64b1def-a846-4454-8c52-304bd4f0a71a" id="sec.203-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">identify himself or herself to the occupier by producing the authorised person’s identity card or another document evidencing the authorised person’s appointment;</txt></block></li><li guid="_7380f829-ecb6-45e7-86a5-2da54e486178" id="sec.203-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">tell the occupier the purpose of the entry;</txt></block></li><li guid="_e4e137b9-5ad2-48d7-99e3-17bd864d598b" id="sec.203-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">tell the occupier the authorised person is permitted under this Act to enter the place.</txt></block></li></list></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_2e9f556a-c750-44a2-95f0-0adb959aa032" id="ch.10-pt.3-div.5"><no>Division 5</no><heading guid="_47508d4c-ad45-4000-be89-adc30653533a" id="ch.10-pt.3-div.5-he">Entry of stationary vehicles by authorised persons</heading><clause affected.by.uncommenced="0" guid="_b9fe0eb7-d6f8-44d5-a902-d1361707f25a" id="sec.204" provision.type="other" spent.amends="0"><no>204</no><heading guid="_63e6235c-0564-4553-9d3f-5be59fadf8c0" id="sec.204-he">Power to enter</heading><subclause affected.by.uncommenced="0" guid="_9dbdabd4-6287-4f24-b080-a8b787158527" id="sec.204-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An authorised person may enter and stay in a vehicle if the vehicle is stationary and the authorised person reasonably suspects, or is aware, that a thing in or on the vehicle may provide evidence of the commission of an offence against <intref check="valid" refid="sec.53" target.guid="_f86b8d4b-010d-4c7b-83cf-00c6cb4be065">section 53</intref><intref check="valid" refid="sec.53-ssec.2" target.guid="_5a8388b6-2afa-49de-b2a2-391f931857d4">(2)</intref> or <intref check="valid" refid="sec.104" target.guid="_428f4a48-281f-4088-8124-b981fb6fd86a">104</intref><intref check="valid" refid="sec.104-ssec.1" target.guid="_d4b52884-8745-4059-bece-7159bd221cc0">(1)</intref>.</txt><note guid="_b6fc450a-1dff-44d3-893e-1c7d9e1edc9a" id="sec.204-ssec.1-note" type="example"><heading guid="_dbe0ed3f-31c0-428c-862a-30e6195ce02a" id="sec.204-ssec.1-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="ch.10-pt.4" target.guid="_c1631ee5-bbf6-4133-8207-313ee3e05ff0">part 4</intref>, <intref check="valid" refid="ch.10-pt.4-div.1" target.guid="_f6f80d88-8804-4d19-9ca3-98f99b4a9fa0">division 1</intref> for authorised person’s powers to stop moving vehicle.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_27d1c3d1-22d8-48e9-a3c4-c42f70319386" id="sec.204-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An authorised person may not enter a part of a vehicle under <intref check="valid" refid="sec.204-ssec.1" target.guid="_9dbdabd4-6287-4f24-b080-a8b787158527">subsection (1)</intref> that is used only as a living area.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ce6aa265-99da-4df5-8db3-47260e36e227" id="sec.204-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The power to enter under this section is in addition to the powers under <intref check="valid" refid="sec.192" target.guid="_6181924e-a9d4-4366-8e35-9bd0a5179a1e">section 192</intref><intref check="valid" refid="sec.192-ssec.1" target.guid="_a133fe7b-f799-4677-95f4-431f879f0d67">(1)</intref><intref check="valid" refid="sec.192-ssec.1-para1.a" target.guid="_0f32ded9-5f46-4322-8c52-a8e1f1389115">(a)</intref><intref check="valid" refid="sec.192-ssec.1-para1.a-para2.ii" target.guid="_9c78d8b0-8385-4443-a193-1b69f0a6822d">(ii)</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1ed631aa-a0fe-419a-8f0e-768812e4cf73" id="sec.205" provision.type="other" spent.amends="0"><no>205</no><heading guid="_c8226076-6ea5-4124-99f8-08ca87eee544" id="sec.205-he">Procedure for entry</heading><subclause affected.by.uncommenced="0" guid="_88b339ab-ca8f-414d-9476-ec53085a75c9" id="sec.205-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0"><intref check="valid" refid="sec.205-ssec.2" target.guid="_6bbb1f8b-15a1-48b5-95d8-a2bd82a673a8">Subsection (2)</intref> applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1e7a010f-57aa-49cf-9ab3-f74f208a96d8" id="sec.205-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an authorised person is intending to enter a vehicle under <intref check="valid" refid="sec.204" target.guid="_b9fe0eb7-d6f8-44d5-a902-d1361707f25a">section 204</intref>; and</txt></block></li><li guid="_01e96b8e-9ea9-484d-8526-5df6d2a55a38" id="sec.205-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the person in control of the vehicle is present at the vehicle.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6bbb1f8b-15a1-48b5-95d8-a2bd82a673a8" id="sec.205-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Before entering the vehicle, the authorised person must do, or make a reasonable attempt to do, each of the following things—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_03490c1b-cf2b-4c6e-a994-24f26d3902bb" id="sec.205-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">identify himself or herself to the person in control by producing the authorised person’s identity card or another document evidencing the authorised person’s appointment;</txt></block></li><li guid="_2e7d4587-ff1d-4a79-9ac6-90d378e159f8" id="sec.205-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">tell the person the purpose of the entry;</txt></block></li><li guid="_a4de9609-c959-4fa7-914b-a54e4cf105bd" id="sec.205-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">seek the consent of the person to the entry;</txt></block></li><li guid="_4a6dcb9f-4f2c-495b-ae62-9608df12462e" id="sec.205-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">tell the person the authorised person is permitted under this Act to enter the vehicle without the person’s consent.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2e855014-6e70-44c2-ad5f-cb9f0e080c57" id="sec.205-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the person in control of the vehicle is not present at the vehicle, the authorised person must take reasonable steps to advise the person or any registered operator of the vehicle of the authorised person’s intention to enter the vehicle.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_77399dc3-5c28-42c1-9ef7-f850f980f024" id="sec.205-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0"><intref check="valid" refid="sec.205-ssec.3" target.guid="_2e855014-6e70-44c2-ad5f-cb9f0e080c57">Subsection (3)</intref> does not require the authorised person to take a step the authorised person reasonably believes may frustrate or otherwise hinder the performance of the authorised person’s functions or the purpose of the intended entry.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2e4eff43-dc07-4377-949e-1ed4b5e3c21b" id="sec.205-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_4681933b-91ca-41bb-8b68-1f673c642015" id="sec.205-ssec.5-def.registeredoperator_"><txt break.before="1"><defterm guid="_4904642f-8dc7-45d0-8da2-9a66948d6a06" id="sec.205-ssec.5-def.registeredoperator" type="definition">registered operator</defterm>, of a vehicle, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6eab6c06-10e1-4125-819d-8456b9d86072" id="sec.205-ssec.5-def.registeredoperator-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if it is registered in Queensland—the person in whose name the vehicle is registered under the <legref check="valid" jurisd="QLD" target.doc.id="act-1995-009" target.version.series="9b6b47f6-005d-47e6-afd5-1c5039eda4c6" type="act"><name emphasis="yes">Transport Operations (Road Use Management) Act 1995</name></legref>; or</txt></block></li><li guid="_297c2498-2599-43d9-8011-7cae0a7cd547" id="sec.205-ssec.5-def.registeredoperator-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if it is registered in another State—the person in whose name the vehicle is registered under the <legref check="valid" jurisd="QLD" target.doc.id="act-2011-031" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" type="act">Act</legref> of the State that corresponds to the <legref check="valid" jurisd="QLD" target.doc.id="act-1995-009" target.version.series="9b6b47f6-005d-47e6-afd5-1c5039eda4c6" type="act"><name emphasis="yes">Transport Operations (Road Use Management) Act 1995</name></legref>.</txt></block></li></list></definition></deflist></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_c1631ee5-bbf6-4133-8207-313ee3e05ff0" id="ch.10-pt.4"><no>Part 4</no><heading guid="_f7403cd4-5d73-41c6-b7cd-905ec7090ede" id="ch.10-pt.4-he">Other authorised persons’ powers and related matters</heading><division affected.by.uncommenced="0" guid="_f6f80d88-8804-4d19-9ca3-98f99b4a9fa0" id="ch.10-pt.4-div.1"><no>Division 1</no><heading guid="_24c2cfea-9681-41d2-8037-8bd3252c14c7" id="ch.10-pt.4-div.1-he">Stopping or moving vehicles</heading><clause affected.by.uncommenced="0" guid="_c6538b06-daad-4fcc-a883-d4f9c1607a00" id="sec.206" provision.type="other" spent.amends="0"><no>206</no><heading guid="_325cdd03-1cf3-490e-b1ab-88c2504eb4f8" id="sec.206-he">Application of <intref check="valid" refid="ch.10-pt.4-div.1" target.guid="_f6f80d88-8804-4d19-9ca3-98f99b4a9fa0">div 1</intref></heading><block><txt break.before="1">This division applies if an authorised person reasonably suspects, or is aware, that a thing in or on a vehicle may provide evidence of the commission of an offence against <intref check="valid" refid="sec.53" target.guid="_f86b8d4b-010d-4c7b-83cf-00c6cb4be065">section 53</intref><intref check="valid" refid="sec.53-ssec.2" target.guid="_5a8388b6-2afa-49de-b2a2-391f931857d4">(2)</intref> or <intref check="valid" refid="sec.104" target.guid="_428f4a48-281f-4088-8124-b981fb6fd86a">104</intref><intref check="valid" refid="sec.104-ssec.1" target.guid="_d4b52884-8745-4059-bece-7159bd221cc0">(1)</intref>.</txt></block></clause><clause affected.by.uncommenced="0" guid="_903fd22d-91a1-431f-a6fc-6b8327ab45cc" id="sec.207" provision.type="other" spent.amends="0"><no>207</no><heading guid="_96c8c945-2170-473c-9c8d-77433c4dd537" id="sec.207-he">Power to stop or move</heading><subclause affected.by.uncommenced="0" guid="_e7bdfbfe-3ce0-428c-b70c-cf156bd119ae" id="sec.207-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the vehicle is moving, the authorised person may, to exercise his or her powers, signal or otherwise direct the person in control of the vehicle to stop the vehicle and to bring the vehicle to, and keep it at, a convenient place within a reasonable distance to allow the authorised person to exercise the powers.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_232fd747-29f7-4991-91d6-ad167746d221" id="sec.207-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the vehicle is stopped, the authorised person may direct the person in control of the vehicle—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9f0c45c8-389d-4b84-a375-391a1ab94bb6" id="sec.207-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">not to move it until the authorised person has exercised the authorised person’s powers; or</txt></block></li><li guid="_6c0b7075-8358-4d5c-bd95-7f447a8dcb61" id="sec.207-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to move the vehicle to, and keep it at, a stated reasonable place to allow the authorised person to exercise the powers.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_925b481b-f16c-4ced-9fec-282a11add4fb" id="sec.207-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">When giving the direction under <intref check="valid" refid="sec.207-ssec.2" target.guid="_232fd747-29f7-4991-91d6-ad167746d221">subsection (2)</intref>, the authorised person must give the person in control an offence warning for the direction.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_daf6862a-a1dc-4a83-8ce7-2329abeb7272" id="sec.208" provision.type="other" spent.amends="0"><no>208</no><heading guid="_677c1c59-7004-4ba3-a9c6-21e40f284e42" id="sec.208-he">Identification requirements if vehicle moving</heading><subclause affected.by.uncommenced="0" guid="_8b95ed8c-c0c6-4052-af75-692a8f91a78f" id="sec.208-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the authorised person proposes to give a direction under <intref check="valid" refid="sec.207" target.guid="_903fd22d-91a1-431f-a6fc-6b8327ab45cc">section 207</intref><intref check="valid" refid="sec.207-ssec.1" target.guid="_e7bdfbfe-3ce0-428c-b70c-cf156bd119ae">(1)</intref> and the vehicle is moving.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ab0de422-ec83-4f06-b2e0-f2a77add4a14" id="sec.208-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The authorised person must clearly identify himself or herself as an authorised person exercising the authorised person’s powers.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fee08c66-20d9-4a10-a286-8e3c87579298" id="sec.208-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">When the vehicle stops, the authorised person must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_851292f0-1a4b-4ca0-865f-7230f3100c08" id="sec.208-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">have with him or her the authorised person’s identity card; and</txt></block></li><li guid="_85c584fe-c612-4deb-86ce-9b41537ca2b2" id="sec.208-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">immediately produce the identity card for the inspection of the person in control of the vehicle.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_330a8240-aefe-4ec4-9a1d-d1a47aed8fa1" id="sec.208-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0"><intref check="valid" refid="sec.208-ssec.3" target.guid="_fee08c66-20d9-4a10-a286-8e3c87579298">Subsection (3)</intref> applies despite <intref check="valid" refid="sec.188" target.guid="_45fe7dfb-d0dd-4f6c-950c-0410bab638f6">section 188</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_54f82f93-1a3a-42e3-afc5-e5a8e3986a7b" id="sec.209" provision.type="other" spent.amends="0"><no>209</no><heading guid="_63a598c8-669e-422c-849f-1845ca675cb6" id="sec.209-he">Failure to comply with direction</heading><subclause affected.by.uncommenced="0" guid="_025ceb47-f794-4ee3-9e2f-dfbd5cd40acd" id="sec.209-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The person in control of the vehicle must comply with a direction under <intref check="valid" refid="sec.207" target.guid="_903fd22d-91a1-431f-a6fc-6b8327ab45cc">section 207</intref> unless the person has a reasonable excuse.</txt></block><penalty guid="_96270dd6-7b90-49d5-a0af-488b41286982" id="sec.209-ssec.1-pen"><block><txt break.before="1">Maximum penalty—60 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_3139bc66-d35c-41fe-ab21-fb54d419aea4" id="sec.209-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">It is a reasonable excuse for the person not to comply with a direction if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_834ccb4e-b48d-442a-9e96-e228316f9b6c" id="sec.209-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the vehicle was moving and the authorised person did not comply with <intref check="valid" refid="sec.208" target.guid="_daf6862a-a1dc-4a83-8ce7-2329abeb7272">section 208</intref>; or</txt></block></li><li guid="_ee82b96d-55d2-419c-92e5-29b6a88182f7" id="sec.209-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to comply immediately would have endangered someone else or caused loss or damage to property, and the person complies as soon as it is practicable to do so.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_dd9bcd6d-c8b7-443d-8ef4-ef065e750ee7" id="sec.209-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0"><intref check="valid" refid="sec.209-ssec.2" target.guid="_3139bc66-d35c-41fe-ab21-fb54d419aea4">Subsection (2)</intref> does not limit <intref check="valid" refid="sec.209-ssec.1" target.guid="_025ceb47-f794-4ee3-9e2f-dfbd5cd40acd">subsection (1)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f74b2e18-9061-4841-aa04-2dc93af265fc" id="sec.209-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A person does not commit an offence against <intref check="valid" refid="sec.209-ssec.1" target.guid="_025ceb47-f794-4ee3-9e2f-dfbd5cd40acd">subsection (1)</intref> if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dbafc906-d849-4932-a516-27aa36d4f634" id="sec.209-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the direction the person fails to comply with is given under <intref check="valid" refid="sec.207" target.guid="_903fd22d-91a1-431f-a6fc-6b8327ab45cc">section 207</intref><intref check="valid" refid="sec.207-ssec.2" target.guid="_232fd747-29f7-4991-91d6-ad167746d221">(2)</intref>; and</txt></block></li><li guid="_2ea2e8f5-475f-4c07-ace8-d4eff3bea98c" id="sec.209-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the person is not given an offence warning for the direction.</txt></block></li></list></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_dc05bcdc-efe3-4aaa-ab16-3ed908dc7849" id="ch.10-pt.4-div.2"><no>Division 2</no><heading guid="_663f91e7-d2c8-4fa2-a173-f479e538ce22" id="ch.10-pt.4-div.2-he">General powers after entering places</heading><clause affected.by.uncommenced="0" guid="_d762277a-b729-4670-8457-85285c8a8001" id="sec.210" provision.type="other" spent.amends="0"><no>210</no><heading guid="_82b32ba5-7e94-40bd-9ff6-86cbd486ab8d" id="sec.210-he">Application of <intref check="valid" refid="ch.10-pt.4-div.2" target.guid="_dc05bcdc-efe3-4aaa-ab16-3ed908dc7849">div 2</intref></heading><subclause affected.by.uncommenced="0" guid="_4e9e4753-2bdd-4f36-b10c-98745fd65e18" id="sec.210-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The powers under this division may be exercised if an authorised person enters a place under—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c6b9821e-082d-499f-836c-adf265665d7c" id="sec.210-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0"><intref check="valid" refid="sec.192" target.guid="_6181924e-a9d4-4366-8e35-9bd0a5179a1e">section 192</intref><intref check="valid" refid="sec.192-ssec.1" target.guid="_a133fe7b-f799-4677-95f4-431f879f0d67">(1)</intref><intref check="valid" refid="sec.192-ssec.1-para1.a" target.guid="_0f32ded9-5f46-4322-8c52-a8e1f1389115">(a)</intref><intref check="valid" refid="sec.192-ssec.1-para1.a-para2.i" target.guid="_a70bea4f-0f91-49c1-81d4-10eda3630054">(i)</intref>, <intref check="valid" refid="sec.192-ssec.1-para1.a-para2.ii" target.guid="_9c78d8b0-8385-4443-a193-1b69f0a6822d">(ii)</intref>, <intref check="valid" refid="sec.192-ssec.1-para1.a-para2.iv" target.guid="_a603a03c-e8b1-42d1-8f8e-b4f7bd9570ef">(iv)</intref>, <intref check="valid" refid="sec.192-ssec.1-para1.a-para2.v" target.guid="_131d2e60-87c3-40a2-975b-07dfab4f0465">(v)</intref> or (b); or</txt></block></li><li guid="_adbe2bbf-bcbd-46ee-b30a-94a112625d44" id="sec.210-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0"><intref check="valid" refid="sec.204" target.guid="_b9fe0eb7-d6f8-44d5-a902-d1361707f25a">section 204</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6f7752b9-e6ed-4bef-bb88-c5315712af53" id="sec.210-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if the authorised person enters under <intref check="valid" refid="sec.192" target.guid="_6181924e-a9d4-4366-8e35-9bd0a5179a1e">section 192</intref><intref check="valid" refid="sec.192-ssec.1" target.guid="_a133fe7b-f799-4677-95f4-431f879f0d67">(1)</intref><intref check="valid" refid="sec.192-ssec.1-para1.a" target.guid="_0f32ded9-5f46-4322-8c52-a8e1f1389115">(a)</intref><intref check="valid" refid="sec.192-ssec.1-para1.a-para2.i" target.guid="_a70bea4f-0f91-49c1-81d4-10eda3630054">(i)</intref> or <intref check="valid" refid="sec.192-ssec.1-para1.a-para2.ii" target.guid="_9c78d8b0-8385-4443-a193-1b69f0a6822d">(ii)</intref>, the powers under this division are subject to any conditions of the consent or terms of the warrant.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_84b703a4-9f2d-4e8d-8943-e424fd026b21" id="sec.211" provision.type="other" spent.amends="0"><no>211</no><heading guid="_5eae76f1-46fe-432c-a903-2f75d480a2fb" id="sec.211-he">General powers</heading><subclause affected.by.uncommenced="0" guid="_c238211c-6d13-4e6b-98de-46ade3baf21d" id="sec.211-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The authorised person may do any of the following (each a <defterm guid="_1265b1c2-2127-4be3-a79c-95878f204a5b" id="sec.211-def.generalpower" type="definition">general power</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_090aec82-46e9-4267-b2a5-c98ac1f8df79" id="sec.211-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">search any part of the place;</txt></block></li><li guid="_0d098ced-3220-4d1c-b465-f30809f7bf3c" id="sec.211-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">inspect, examine or film any part of the place or anything at the place;</txt></block></li><li guid="_c7cee33a-521f-4ceb-8ce0-792c51de4f21" id="sec.211-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">take for examination or analysis a thing, or a sample of or from a thing, at the place;</txt></block></li><li guid="_256ca006-3b69-4ed8-9d51-abaf57b7b8bb" id="sec.211-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">place an identifying mark in or on anything at the place;</txt></block></li><li guid="_a4651b8e-1d08-40e9-98f9-69619f8dcba1" id="sec.211-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">take an extract from, or copy, a document at the place, or take the document to another place to copy;</txt></block></li><li guid="_4a1d0648-ee3c-489f-abad-91df89bc0dc6" id="sec.211-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">produce an image or writing at the place from an electronic document or, to the extent it is not practicable, take a thing containing an electronic document to another place to produce an image or writing;</txt></block></li><li guid="_bf18e7d7-0981-4781-bd2e-a6cd656dadf3" id="sec.211-ssec.1-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">take to, into or onto the place and use any person, equipment and materials the authorised person reasonably requires for exercising the authorised person’s powers under this division;</txt></block></li><li guid="_5bd1bbfd-7f91-4d2a-b647-668640d65f06" id="sec.211-ssec.1-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">remain at the place for the time necessary to achieve the purpose of the entry.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8af47fc3-cbb5-4154-a7d7-4303b4b7f216" id="sec.211-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The authorised person may take a necessary step to allow the exercise of a general power.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1e6671a0-f74e-4817-a1d2-d8c0dfa4e67e" id="sec.211-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the authorised person takes a document from the place to copy it, the authorised person must copy and return the document to the place as soon as practicable.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1e2dc8f3-1d1d-47ce-97e9-15b52f1e2acf" id="sec.211-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the authorised person takes from the place an article or device reasonably capable of producing a document from an electronic document to produce the document, the authorised person must produce the document and return the article or device to the place as soon as practicable.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_59cdb92f-0c7c-43eb-9212-e8f901617ee5" id="sec.211-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_32a26953-f855-4fc8-8d56-8f4e5f9b3c0a" id="sec.211-ssec.5-def.examine_"><txt break.before="1"><defterm guid="_4d59b6b1-5d20-4fa6-a090-cae516679ac0" id="sec.211-ssec.5-def.examine" type="definition">examine</defterm> includes analyse, test, account, measure, weigh, grade, gauge and identify.</txt></definition><definition affected.by.uncommenced="0" guid="_23ccd119-77e1-4a21-890a-908f73ea3383" id="sec.211-ssec.5-def.film_"><txt break.before="1"><defterm guid="_69dbee8a-a469-4d88-9d98-01b46438ea1d" id="sec.211-ssec.5-def.film" type="definition">film</defterm> includes photograph, videotape and record an image in another way.</txt></definition><definition affected.by.uncommenced="0" guid="_c923128b-1814-4fd2-81eb-ff4163fdb119" id="sec.211-ssec.5-def.inspect_"><txt break.before="1"><defterm guid="_00ffc299-7155-4761-bf2a-cdd42dc1722f" id="sec.211-ssec.5-def.inspect" type="definition">inspect</defterm>, a thing, includes open the thing and examine its contents.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f22ebbec-1c50-44f2-a8cf-beb906b42077" id="sec.212" provision.type="other" spent.amends="0"><no>212</no><heading guid="_830041a3-53ec-4332-8d5b-bbeb445a5886" id="sec.212-he">Power to require reasonable help</heading><subclause affected.by.uncommenced="0" guid="_4865b90a-a853-4d52-98d0-c9f0b7cfabe1" id="sec.212-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The authorised person may make a requirement (a <defterm guid="_45636fd2-9981-4371-bc8a-37300e2e0782" id="sec.212-def.helprequirement" type="definition">help requirement</defterm>) of an occupier of the place or a person at the place to give the authorised person reasonable help to exercise a general power, including, for example, to produce a document or to give information.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_77d25e33-b849-49cc-b8af-c5c00427e503" id="sec.212-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A help requirement may require the person to give the authorised person any translation, code, password or other information necessary to gain access to or interpret and understand any document or information obtained by the authorised person under a general power.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ff696a9a-cb51-483d-9505-6b1f881347b1" id="sec.212-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">When making the help requirement, the authorised person must give the person an offence warning for the requirement.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_73e5df12-f15a-4f3d-97d1-84931d788bc3" id="sec.213" provision.type="other" spent.amends="0"><no>213</no><heading guid="_c08a978c-c414-494e-9e3a-3f5adde997e2" id="sec.213-he">Offence to contravene help requirement</heading><subclause affected.by.uncommenced="0" guid="_ac76392c-3734-4d6b-9b24-c9f8c8ba76e5" id="sec.213-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person of whom a help requirement has been made must comply with the requirement unless the person has a reasonable excuse.</txt></block><penalty guid="_a83aa10f-8f8f-44cb-84d5-7364868059c6" id="sec.213-ssec.1-pen"><block><txt break.before="1">Maximum penalty—50 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_6de71212-bf19-4312-a591-6348703d35cb" id="sec.213-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">It is a reasonable excuse for an individual not to comply with a help requirement if complying might tend to incriminate the individual or expose the individual to a penalty.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d52183ad-6c3d-49da-86ec-fbda0275b16c" id="sec.213-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.213-ssec.2" target.guid="_6de71212-bf19-4312-a591-6348703d35cb">subsection (2)</intref> does not apply if a document or information the subject of the help requirement is required to be held or kept by the defendant under this Act.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_1b63af2d-c439-4e60-87c4-98e3522c6304" id="ch.10-pt.4-div.3"><no>Division 3</no><heading guid="_955bca7f-15cd-4f11-9767-5278da972dc9" id="ch.10-pt.4-div.3-he">Seizure and forfeiture</heading><subdivision affected.by.uncommenced="0" guid="_2310c054-892c-4107-8fbc-be09933f6fa1" id="ch.10-pt.4-div.3-sdiv.1"><no>Subdivision 1</no><heading guid="_5b8884cc-b223-4a17-beed-6fe30b250bd9" id="ch.10-pt.4-div.3-sdiv.1-he">Power to seize</heading><clause affected.by.uncommenced="0" guid="_b81fd6e7-7259-4caf-bd78-364b6e27291f" id="sec.214" provision.type="other" spent.amends="0"><no>214</no><heading guid="_c0ed497a-0225-42fa-b6fd-e0b16126dc35" id="sec.214-he">Seizing evidence at a place that may be entered without consent or warrant</heading><block><txt break.before="1">An authorised person who enters a place the authorised person may enter under this Act without the consent of an occupier of the place and without a warrant may seize a thing at the place if the authorised person reasonably believes the thing is evidence of an offence against this Act.</txt></block></clause><clause affected.by.uncommenced="0" guid="_db07e741-b4ae-4365-b327-3ae0f6b585c8" id="sec.215" provision.type="other" spent.amends="0"><no>215</no><heading guid="_03057655-c0de-490e-94b8-d19875fcdb64" id="sec.215-he">Seizing evidence at a place that may be entered only with consent or warrant</heading><subclause affected.by.uncommenced="0" guid="_aa20e6e9-f50a-4897-992f-c5f6b33cc7ad" id="sec.215-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_50191c32-2016-48e2-a720-9d3cac7c7ead" id="sec.215-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an authorised person is authorised to enter a place only with the consent of an occupier of the place or a warrant; and</txt></block></li><li guid="_cf585430-a302-4df1-8b5b-c274578a6f36" id="sec.215-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the authorised person enters the place after obtaining the consent or under a warrant.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_36d90e73-c330-4f73-b4b6-7181f4fe9186" id="sec.215-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the authorised person enters the place with the occupier’s consent, the authorised person may seize a thing at the place only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3d80fcbb-a610-46b9-9390-cd6392baf68d" id="sec.215-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the authorised person reasonably believes the thing is evidence of an offence against this Act; and</txt></block></li><li guid="_842cb7b6-3ba2-4f5a-a440-02688a9240f5" id="sec.215-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">seizure of the thing is consistent with the purpose of entry as explained to the occupier when asking for the occupier’s consent.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ccc7bcfb-38c7-49ae-9e0f-9e1f6e21a5df" id="sec.215-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the authorised person enters the place under a warrant, the authorised person may seize the evidence for which the warrant was issued.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4fcd9396-df12-4ec3-b9c9-616c0de82178" id="sec.215-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The authorised person may also seize anything else at the place if the authorised person reasonably believes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a5c294b3-619f-4052-a4ab-4f35ca176e27" id="sec.215-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the thing is evidence of an offence against this Act; and</txt></block></li><li guid="_3e293475-b8ce-4b37-8650-1cb832fb3982" id="sec.215-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the seizure is necessary to prevent the thing being—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_51765283-e84c-4c2d-a40c-77f8fe7884a7" id="sec.215-ssec.4-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">hidden, lost or destroyed; or</txt></block></li><li guid="_c107ed8b-d905-46ce-a792-070fa987c43c" id="sec.215-ssec.4-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">used to continue, or repeat, the offence.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_219d5720-160b-4b0d-acd3-d11f7996f579" id="sec.215-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The authorised person may also seize a thing at the place if the authorised person reasonably believes it has just been used in committing an offence against this Act.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3cccd47c-8492-49bd-ba45-dcddafa6f7c2" id="sec.216" provision.type="other" spent.amends="0"><no>216</no><heading guid="_4d701e0f-3236-4d39-8062-2eb6a33face0" id="sec.216-he">Seizure of property subject to security</heading><subclause affected.by.uncommenced="0" guid="_dc6955fe-06c9-4c62-a207-ef57175eb53b" id="sec.216-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An authorised person may seize a thing, and exercise powers relating to the thing, despite a lien or other security over the thing claimed by another person.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8d48a81d-aaa8-4a47-b95e-6d6a067d57aa" id="sec.216-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the seizure does not affect the other person’s claim to the lien or other security against a person other than the authorised person or a person acting for the authorised person.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_36b16f0f-f167-448c-b6d6-d6b401810dc7" id="ch.10-pt.4-div.3-sdiv.2"><no>Subdivision 2</no><heading guid="_fc1b52b8-07a6-4249-96b4-14928c4cc31d" id="ch.10-pt.4-div.3-sdiv.2-he">Powers to support seizure</heading><clause affected.by.uncommenced="0" guid="_cd327a01-2119-40ea-9b32-4994b96e5f9a" id="sec.217" provision.type="other" spent.amends="0"><no>217</no><heading guid="_092775a6-2fc1-4ad2-b76b-278f59dafaf5" id="sec.217-he">Requirement of person in control of thing to be seized</heading><subclause affected.by.uncommenced="0" guid="_e243c7fb-fadc-4684-bb61-8f5a859e4a6b" id="sec.217-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">To enable a thing to be seized, an authorised person may require the person in control of it—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_653e73ae-43e3-425f-bdeb-34c1d8d11021" id="sec.217-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to take it to a stated reasonable place by a stated reasonable time; and</txt></block></li><li guid="_846a460b-4203-4a6e-9d83-3b3ed2d329de" id="sec.217-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if necessary, to remain in control of it at the stated place for a stated reasonable time.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_918d1294-f057-4e4b-a777-5d087155b591" id="sec.217-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The requirement—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d08ece0a-e508-418f-a191-275a02737d12" id="sec.217-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must be made by notice; or</txt></block></li><li guid="_2f21097a-f1d7-4ceb-8663-871bed4ae6a9" id="sec.217-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if for any reason it is not practicable to give a notice, may be made orally and confirmed by notice as soon as practicable.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f1a18bf4-b0eb-4593-b214-04acae288a30" id="sec.218" provision.type="other" spent.amends="0"><no>218</no><heading guid="_c567a80f-ac07-499a-817c-dc720cddd849" id="sec.218-he">Offence to contravene seizure requirement</heading><block><txt break.before="1">A person of whom a requirement is made under <intref check="valid" refid="sec.217" target.guid="_cd327a01-2119-40ea-9b32-4994b96e5f9a">section 217</intref> must comply with the requirement unless the person has a reasonable excuse.</txt></block><penalty guid="_4398a245-920a-4266-98db-f5d3a7246700" id="sec.218-pen"><block><txt break.before="1">Maximum penalty—60 penalty units.</txt></block></penalty></clause><clause affected.by.uncommenced="0" guid="_56dc2324-1f44-4c31-9887-00709e08886e" id="sec.219" provision.type="other" spent.amends="0"><no>219</no><heading guid="_63862833-b202-4aba-9dc9-9280da9dd793" id="sec.219-he">Power to secure seized thing</heading><subclause affected.by.uncommenced="0" guid="_40e8a0a4-6c6f-4697-a191-eb88ffaf4969" id="sec.219-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Having seized a thing under this division, an authorised person may—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dfe1ad29-8200-41bb-98e4-66323f3d58d4" id="sec.219-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">leave it at the place where it was seized (the <defterm guid="_abed3644-81b2-4218-a652-6b02bdc12a91" id="sec.219-ssec.1-def.placeofseizure" type="definition">place of seizure</defterm>) and take reasonable action to restrict access to it; or</txt></block></li><li guid="_a7037e3d-c304-40da-89ec-6ebb32481a8c" id="sec.219-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">move it from the place of seizure.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2cbfd572-1e04-4692-bfb4-507077fd13bf" id="sec.219-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.219-ssec.1" target.guid="_40e8a0a4-6c6f-4697-a191-eb88ffaf4969">subsection (1)</intref><intref check="valid" refid="sec.219-ssec.1-para1.a" target.guid="_dfe1ad29-8200-41bb-98e4-66323f3d58d4">(a)</intref>, the authorised person may, for example—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fe32bff8-c9ce-4753-adcf-9e27e82353f5" id="sec.219-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">seal the thing, or the entrance to the place of seizure, and mark the thing or place to show access to the thing or place is restricted; or</txt></block></li><li guid="_890ea254-309a-45ab-ad21-2c666449782e" id="sec.219-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for equipment—make it inoperable; or</txt><note guid="_4eb09e43-328b-4154-89b4-99fe3c2140c4" id="sec.219-ssec.2-para1.b-note" type="example"><heading guid="_e88f1c38-4637-48b5-a516-15ca53dbbe07" id="sec.219-ssec.2-para1.b-note-he">Example—</heading><block><txt break.before="1">make it inoperable by dismantling it or removing a component without which the equipment can not be used</txt></block></note></block></li><li guid="_4e2ef209-8aab-4919-baae-ddc4593031d4" id="sec.219-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">require a person the authorised person reasonably believes is in control of the place or thing to do an act mentioned in <intref check="valid" refid="sec.219-ssec.2-para1.a" target.guid="_fe32bff8-c9ce-4753-adcf-9e27e82353f5">paragraph (a)</intref> or <intref check="valid" refid="sec.219-ssec.2-para1.b" target.guid="_890ea254-309a-45ab-ad21-2c666449782e">(b)</intref> or anything else an authorised person could do under <intref check="valid" refid="sec.219-ssec.1" target.guid="_40e8a0a4-6c6f-4697-a191-eb88ffaf4969">subsection (1)</intref><intref check="valid" refid="sec.219-ssec.1-para1.a" target.guid="_dfe1ad29-8200-41bb-98e4-66323f3d58d4">(a)</intref>.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_83c964e1-9849-405e-8227-7fb3d9def5b5" id="sec.220" provision.type="other" spent.amends="0"><no>220</no><heading guid="_6072a00a-8d69-4ab7-882b-e36f48977161" id="sec.220-he">Offence to contravene other seizure requirement</heading><block><txt break.before="1">A person must comply with a requirement made of the person under <intref check="valid" refid="sec.219" target.guid="_56dc2324-1f44-4c31-9887-00709e08886e">section 219</intref><intref check="valid" refid="sec.219-ssec.2" target.guid="_2cbfd572-1e04-4692-bfb4-507077fd13bf">(2)</intref><intref check="valid" refid="sec.219-ssec.2-para1.c" target.guid="_4e2ef209-8aab-4919-baae-ddc4593031d4">(c)</intref> unless the person has a reasonable excuse.</txt></block><penalty guid="_aa841c83-dc0c-452e-976a-090c1dc35ad0" id="sec.220-pen"><block><txt break.before="1">Maximum penalty—60 penalty units.</txt></block></penalty></clause><clause affected.by.uncommenced="0" guid="_ba2f9576-11ae-4a1f-9129-0a20ec6feb20" id="sec.221" provision.type="other" spent.amends="0"><no>221</no><heading guid="_86d28d49-3c52-4723-adaa-2f353935b901" id="sec.221-he">Offence to interfere</heading><subclause affected.by.uncommenced="0" guid="_81a056a9-7eaa-4815-8495-052d3dcf35b3" id="sec.221-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If access to a seized thing is restricted under <intref check="valid" refid="sec.219" target.guid="_56dc2324-1f44-4c31-9887-00709e08886e">section 219</intref>, a person must not tamper with the thing or with anything used to restrict access to the thing without—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_902299fe-0d40-426f-983e-c25af9d4542c" id="sec.221-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an authorised person’s approval; or</txt></block></li><li guid="_0f919197-831b-4f2f-b94a-07e27e62dcc6" id="sec.221-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a reasonable excuse.</txt></block></li></list></block><penalty guid="_a3489858-3515-4ae3-bc9a-ae8c2da3eb30" id="sec.221-ssec.1-pen"><block><txt break.before="1">Maximum penalty—60 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_5ec32eb1-84eb-4c05-ba76-302d63a6ff9d" id="sec.221-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If access to a place is restricted under <intref check="valid" refid="sec.219" target.guid="_56dc2324-1f44-4c31-9887-00709e08886e">section 219</intref>, a person must not enter the place in contravention of the restriction or tamper with anything used to restrict access to the place without—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_153efaa4-e6cc-468c-b893-5a23f9347296" id="sec.221-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an authorised person’s approval; or</txt></block></li><li guid="_2f654d15-6164-4cd7-b474-c7127a0c43c9" id="sec.221-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a reasonable excuse.</txt></block></li></list></block><penalty guid="_1a316d18-ed1e-41c8-9848-8e20a072be38" id="sec.221-ssec.2-pen"><block><txt break.before="1">Maximum penalty—60 penalty units.</txt></block></penalty></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_add375bc-e236-4177-b965-d2a44b96c89e" id="ch.10-pt.4-div.3-sdiv.3"><no>Subdivision 3</no><heading guid="_2e6e1c58-3019-4e54-a32f-1f363e12f79a" id="ch.10-pt.4-div.3-sdiv.3-he">Safeguards for seized things</heading><clause affected.by.uncommenced="0" guid="_48e7ca75-5f19-4c66-b841-e9c58e4ac819" id="sec.222" provision.type="other" spent.amends="0"><no>222</no><heading guid="_67420ab8-00a9-4c0f-bbe4-07b69515ec60" id="sec.222-he">Receipt and information notice for seized thing</heading><subclause affected.by.uncommenced="0" guid="_58edaa16-7b00-4986-b5ee-d5b97a9f61f7" id="sec.222-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if an authorised person seizes anything under this division unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c354f1ea-1b20-49c8-9962-e64c3b5928e1" id="sec.222-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the authorised person reasonably believes there is no-one apparently in possession of the thing or it has been abandoned; or</txt></block></li><li guid="_5fb87df6-de5c-48b2-acd7-1d5cafc607f9" id="sec.222-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">because of the condition, nature and value of the thing it would be unreasonable to require the authorised person to comply with this section.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_cd94cecd-c2b3-4493-99e5-035f6a998a4d" id="sec.222-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The authorised person must, as soon as practicable after seizing the thing, give an owner or person in control of the thing before it was seized—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ca37f8dd-2617-4cb7-b810-7d964032ccc6" id="sec.222-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a receipt for the thing that generally describes the thing and its condition; and</txt></block></li><li guid="_96d6d711-db65-442d-ab4a-df642bd2bb63" id="sec.222-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an information notice for the decision to seize it.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6bf8544f-90ca-4182-8bed-ecc281a7c1c9" id="sec.222-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, if an owner or person from whom the thing is seized is not present when it is seized, the receipt and information notice may be given by leaving them in a conspicuous position and in a reasonably secure way at the place at which the thing is seized.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c272e906-f8f4-41c3-bff1-0220ccea1582" id="sec.222-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The receipt and information notice may—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b739d65f-cee1-4a77-87fb-88568ce6dbaa" id="sec.222-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be given in the same document; and</txt></block></li><li guid="_c6766a8b-232d-4e8c-98fa-d0e64d1bcbe8" id="sec.222-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">relate to more than 1 seized thing.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c87c8fc8-21b9-4fc5-848a-ada27188687d" id="sec.222-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The authorised person may delay giving the receipt and information notice if the authorised person reasonably suspects giving them may frustrate or otherwise hinder an investigation by the authorised person under this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7d73e015-6437-4025-92fa-09ff0088b67b" id="sec.222-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">However, the delay may be only for so long as the authorised person continues to have the reasonable suspicion and remains in the vicinity of the place at which the thing was seized to keep it under observation.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_512a65ea-3658-4217-b50c-84bb5488d36e" id="sec.223" provision.type="other" spent.amends="0"><no>223</no><heading guid="_c1a8f840-82c7-400e-8f97-fdf2b468452f" id="sec.223-he">Access to seized thing</heading><subclause affected.by.uncommenced="0" guid="_d8890363-be75-420b-909c-d5bd3ae7ee73" id="sec.223-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Until a seized thing is forfeited or returned, the authorised person who seized the thing must allow an owner of the thing—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_39bd6f90-cf32-4986-a22f-6e3919d136d4" id="sec.223-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to inspect it at any reasonable time and from time to time; and</txt></block></li><li guid="_ca6988b4-c180-41c5-bd18-bac91720392c" id="sec.223-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if it is a document—to copy it.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_baa5ab00-cbe8-4320-8112-ffa492f47f88" id="sec.223-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.223-ssec.1" target.guid="_d8890363-be75-420b-909c-d5bd3ae7ee73">Subsection (1)</intref> does not apply if it is impracticable or would be unreasonable to allow the inspection or copying.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c7d8550d-43e0-454b-ac61-41dfa118dfe9" id="sec.223-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The inspection or copying must be allowed free of charge.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d634451e-fd08-46fa-8f9f-34401e529f6d" id="sec.224" provision.type="other" spent.amends="0"><no>224</no><heading guid="_4ee3efdd-e23c-4222-a7cf-89eaa70e9f26" id="sec.224-he">Return of seized thing</heading><subclause affected.by.uncommenced="0" guid="_922cbf1a-b8be-41ed-94d6-a157930300d9" id="sec.224-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a seized thing has some intrinsic value and is not—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9139e139-b1ce-4fee-b723-ba40649988df" id="sec.224-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">forfeited or transferred under <intref check="valid" refid="ch.10-pt.4-div.3-sdiv.4" target.guid="_052517e1-e4fb-4ef0-8046-e4a286dd4bf6">subdivision 4</intref> or <intref check="valid" refid="ch.10-pt.4-div.3-sdiv.5" target.guid="_00372fd0-1379-4454-b94b-887ea32856f4">5</intref>; or</txt></block></li><li guid="_b4cbf703-72fd-4e66-92d0-82f6a9981c28" id="sec.224-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">subject to a disposal order under <intref check="valid" refid="ch.10-pt.4-div.4" target.guid="_306c3705-8856-4328-a481-ee8194c5e37a">division 4</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9e941656-f8ae-4332-8cd5-156007675af5" id="sec.224-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The authorised person must return the seized thing to an owner—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_41749086-a429-4a0c-bea5-c616ea914d55" id="sec.224-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">generally—at the end of 1 year after the seizure; or</txt></block></li><li guid="_466648b7-ae56-4464-bd8d-ed2d66f59d84" id="sec.224-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if a proceeding for an offence involving the thing is started within the 1 year—at the end of the proceeding and any appeal from the proceeding.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3deb5015-8d1c-4ba1-aaea-d5b23ec53c2b" id="sec.224-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Despite <intref check="valid" refid="sec.224-ssec.2" target.guid="_9e941656-f8ae-4332-8cd5-156007675af5">subsection (2)</intref>, if the thing was seized as evidence, the authorised person must return the thing seized to an owner as soon as practicable after the authorised person is satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_041ab766-c991-43aa-8bab-efd0d765161f" id="sec.224-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">its continued retention as evidence is no longer required; and</txt></block></li><li guid="_7a717087-d90b-43ad-b72e-267a691f0900" id="sec.224-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">its continued retention is not necessary to prevent it being used to continue, or repeat, an offence against this Act; and</txt></block></li><li guid="_b4dd4fd7-7a0a-4f8f-b890-c63e5299b519" id="sec.224-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">it is lawful for the owner to possess it.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_39c8150b-423b-4a19-b9d8-40a18464a01e" id="sec.224-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Nothing in this section affects a lien or other security over the seized thing.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_052517e1-e4fb-4ef0-8046-e4a286dd4bf6" id="ch.10-pt.4-div.3-sdiv.4"><no>Subdivision 4</no><heading guid="_5d1c1470-36b2-494f-8c90-fc06d50252f5" id="ch.10-pt.4-div.3-sdiv.4-he">Forfeiture</heading><clause affected.by.uncommenced="0" guid="_a16358b2-bf81-4cb2-b899-ee34f74e8db8" id="sec.225" provision.type="other" spent.amends="0"><no>225</no><heading guid="_cd00eff6-9fdf-43bd-a727-9ccd3b60cbbf" id="sec.225-he">Forfeiture by chief executive</heading><subclause affected.by.uncommenced="0" guid="_acfa28d5-a7a2-4d6b-883c-d5ab5330f937" id="sec.225-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may decide a seized thing is forfeited to the State if an authorised person—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_269d365c-195f-451f-932c-bbee47ab3fdf" id="sec.225-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">after making reasonable inquiries, can not find an owner; or</txt></block></li><li guid="_d597cd81-ca23-426c-b8fb-b2426b9e4c78" id="sec.225-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">after making reasonable efforts, can not return it to an owner; or</txt></block></li><li guid="_c96251e2-c771-4ff8-8916-81ddb7b28b24" id="sec.225-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">reasonably believes it is necessary to keep the thing to prevent it being used to commit the offence for which it was seized.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_45490dbb-f98c-40c2-86e8-27bddfa93d23" id="sec.225-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the authorised person is not required to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5840ccd2-61f3-44b3-bfa9-e3f04cba67a9" id="sec.225-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">make inquiries if it would be unreasonable to make inquiries to find an owner; or</txt></block></li><li guid="_e6e374b4-194c-4657-9236-04d55e0a5d30" id="sec.225-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">make efforts if it would be unreasonable to make efforts to return the thing to an owner.</txt><note guid="_d43edf8c-2854-4bf5-8535-43c30e5fb731" id="sec.225-ssec.2-para1.b-note" type="example"><heading guid="_3b8bca06-f0a8-4192-a5b3-4c8521a236a9" id="sec.225-ssec.2-para1.b-note-he">Example for <intref check="valid" refid="sec.225-ssec.2-para1.b" target.guid="_e6e374b4-194c-4657-9236-04d55e0a5d30">paragraph (b)</intref>—</heading><block><txt break.before="1">The owner of the thing has migrated to another country.</txt></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1c28e185-9a82-4f72-8b0e-f088cfcb2047" id="sec.225-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Regard must be had to the thing’s condition, nature and value in deciding—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_703c741a-3258-4274-9cc0-c31cb60d1b3f" id="sec.225-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">whether it is reasonable to make inquiries or efforts; and</txt></block></li><li guid="_9a0e384c-ab3a-4b90-b2fa-e940ae47ceef" id="sec.225-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if inquiries or efforts are made—what inquiries or efforts, including the period over which they are made, are reasonable.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0ff4a4cb-5e74-4574-bf03-89ab4e4620a7" id="sec.226" provision.type="other" spent.amends="0"><no>226</no><heading guid="_71cd2fcd-3a6e-46ee-a466-6fc7364f983c" id="sec.226-he">Information notice for forfeiture decision</heading><subclause affected.by.uncommenced="0" guid="_44593fde-1991-4520-942a-04b1e3b280bb" id="sec.226-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the chief executive decides under <intref check="valid" refid="sec.225" target.guid="_a16358b2-bf81-4cb2-b899-ee34f74e8db8">section 225</intref><intref check="valid" refid="sec.225-ssec.1" target.guid="_acfa28d5-a7a2-4d6b-883c-d5ab5330f937">(1)</intref> to forfeit a thing, the chief executive must as soon as practicable give a person who owned the thing immediately before the forfeiture (the <defterm guid="_e949223d-050c-435c-9664-fef0b256a69d" id="sec.226-def.formerowner" type="definition">former owner</defterm>) an information notice for the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c3b3d4d3-6336-4a9a-9b20-ce6d417a1898" id="sec.226-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The information notice may be given by leaving it at the place where the thing was seized, in a conspicuous position and in a reasonably secure way.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b732c2df-fdfc-498a-8680-8ba905853c03" id="sec.226-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The information notice must state that the former owner may apply for a stay of the decision if he or she seeks a review of the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_021476ef-ab27-4de1-9fb3-f386496827fe" id="sec.226-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.226-ssec.1" target.guid="_44593fde-1991-4520-942a-04b1e3b280bb">subsections (1)</intref> to <intref check="valid" refid="sec.226-ssec.3" target.guid="_b732c2df-fdfc-498a-8680-8ba905853c03">(3)</intref> do not apply if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8145cb5a-8c90-4ab7-b0da-58bb111b3186" id="sec.226-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the decision was made under <intref check="valid" refid="sec.225" target.guid="_a16358b2-bf81-4cb2-b899-ee34f74e8db8">section 225</intref><intref check="valid" refid="sec.225-ssec.1" target.guid="_acfa28d5-a7a2-4d6b-883c-d5ab5330f937">(1)</intref><intref check="valid" refid="sec.225-ssec.1-para1.a" target.guid="_269d365c-195f-451f-932c-bbee47ab3fdf">(a)</intref> or <intref check="valid" refid="sec.225-ssec.1-para1.b" target.guid="_d597cd81-ca23-426c-b8fb-b2426b9e4c78">(b)</intref>; and</txt></block></li><li guid="_fab8f6b0-207f-4f3a-a7c9-b117884d0a55" id="sec.226-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the place where the thing was seized is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_67a4175d-23f6-4927-98d6-1382e8cf2255" id="sec.226-ssec.4-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a public place; or</txt></block></li><li guid="_6e1de5a5-1d10-4513-bb15-a8e7ace16dcc" id="sec.226-ssec.4-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a place where the notice is unlikely to be read by the former owner.</txt></block></li></list></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0b967d2c-8acb-46fa-9c9b-7f7b347ea5d9" id="sec.227" provision.type="other" spent.amends="0"><no>227</no><heading guid="_1f9c3d02-f6d9-4e8a-aaad-2917bc2540be" id="sec.227-he">Forfeiture on conviction</heading><subclause affected.by.uncommenced="0" guid="_3b328e4a-b50b-47a3-9aec-d9db2a4de8e3" id="sec.227-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a court convicts a person of an offence against this Act, the court may order (a <defterm guid="_53193176-d737-43c9-aab9-da593ed007ed" id="sec.227-def.forfeitureorder" type="definition">forfeiture order</defterm>) the forfeiture to the State of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1f03c43c-07b0-4d4c-86e7-8340060255c4" id="sec.227-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">anything used to commit the offence; or</txt></block></li><li guid="_f53afd61-e279-4c9b-b9cb-64dbf47feddd" id="sec.227-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">anything else the subject of the offence.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7c31d0a7-fc82-401b-9fa3-a62eb45d831d" id="sec.227-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The court may make the order—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_933b3673-d213-4f02-a1a8-b208cbcfbbbc" id="sec.227-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">whether or not the thing has been seized; and</txt></block></li><li guid="_75029070-855e-459d-afaf-6b55c19c4983" id="sec.227-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the thing has been seized—whether or not the thing has been returned to the former owner of the thing.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_26befa39-3551-4fcc-bca8-43d8d1d31387" id="sec.227-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The court may make any order to enforce the forfeiture it considers appropriate.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5af2c8ca-2d97-4295-8a94-63516ba53efc" id="sec.227-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">This section does not limit the court’s powers under another law.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8e96caac-649b-4bba-86e4-1412c742f665" id="sec.228" provision.type="other" spent.amends="0"><no>228</no><heading guid="_d5ad1846-123a-4a59-a99d-9f582e39c0d9" id="sec.228-he">Procedure and powers for making forfeiture order</heading><subclause affected.by.uncommenced="0" guid="_2511b511-1123-4c85-bf09-b69a462feb57" id="sec.228-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A forfeiture order may be made on a conviction on the court’s initiative or on an application by the prosecution.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5c30c91b-3563-483c-8707-27cf0441dc42" id="sec.228-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In deciding whether to make a forfeiture order for a thing, the court—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ca8e41dd-58b4-4034-8b96-d936082cbb07" id="sec.228-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">may require notice to be given to anyone the court considers appropriate, including, for example, any person who may have any property in the thing; and</txt></block></li><li guid="_f5077070-bd2a-4a46-926d-151fc8c95383" id="sec.228-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">must hear any submissions that any person claiming to have any property in the thing may wish to make.</txt></block></li></list></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_00372fd0-1379-4454-b94b-887ea32856f4" id="ch.10-pt.4-div.3-sdiv.5"><no>Subdivision 5</no><heading guid="_63adf3c9-7b21-494c-912e-73bb924dee1c" id="ch.10-pt.4-div.3-sdiv.5-he">Dealing with property forfeited or transferred to State</heading><clause affected.by.uncommenced="0" guid="_b7c4a145-6c07-4533-89e1-856771f43cc3" id="sec.229" provision.type="other" spent.amends="0"><no>229</no><heading guid="_bef90b22-e7f8-4735-81d5-4198ee149d38" id="sec.229-he">When thing becomes property of the State</heading><block><txt break.before="1">A thing becomes the property of the State if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_70a5b18c-d699-49d0-9d6b-0ff8071ce7d2" id="sec.229-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the thing is forfeited to the State under <intref check="valid" refid="sec.225" target.guid="_a16358b2-bf81-4cb2-b899-ee34f74e8db8">section 225</intref><intref check="valid" refid="sec.225-ssec.1" target.guid="_acfa28d5-a7a2-4d6b-883c-d5ab5330f937">(1)</intref> or <intref check="valid" refid="sec.227" target.guid="_0b967d2c-8acb-46fa-9c9b-7f7b347ea5d9">227</intref>; or</txt></block></li><li guid="_56350989-a97c-4b86-af5b-d7fe0bda0722" id="sec.229-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the owner of the thing and the State agree, in writing, to the transfer of the ownership of the thing to the State.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_bb8d6e69-ef07-4468-9587-d2172d50f327" id="sec.230" provision.type="other" spent.amends="0"><no>230</no><heading guid="_b1e7516b-1350-4c95-9dc3-fc4ede340b2c" id="sec.230-he">How property may be dealt with</heading><subclause affected.by.uncommenced="0" guid="_75c12359-af33-4055-b34e-58d355475a65" id="sec.230-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, under <intref check="valid" refid="sec.229" target.guid="_b7c4a145-6c07-4533-89e1-856771f43cc3">section 229</intref>, a thing becomes the property of the State.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b3a6b60b-8b5a-46a6-b3df-c6edd553e779" id="sec.230-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may deal with the thing as the chief executive considers appropriate, including, for example, by destroying it or giving it away.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_711470e1-949e-4b65-ac42-6f707cf7b205" id="sec.230-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive must not deal with the thing in a way that could prejudice the outcome of any review or appeal relating to the forfeiture under this Act or the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">QCAT Act</name></legref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2a046369-23bc-4b2a-ba73-d8aad1243376" id="sec.230-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the chief executive sells the thing, the chief executive may, after deducting the costs of the sale, return the proceeds of the sale to the former owner of the thing.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4c280d45-ddf2-4d22-aa11-d2f56fc95c25" id="sec.230-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">This section is subject to any disposal order made for the thing.</txt></block></subclause></clause></subdivision></division><division affected.by.uncommenced="0" guid="_306c3705-8856-4328-a481-ee8194c5e37a" id="ch.10-pt.4-div.4"><no>Division 4</no><heading guid="_9b638415-96d5-48c5-a70b-e8028af5d805" id="ch.10-pt.4-div.4-he">Disposal orders</heading><clause affected.by.uncommenced="0" guid="_ac8d809c-13dc-4764-8be0-f2cfd3e63e87" id="sec.231" provision.type="other" spent.amends="0"><no>231</no><heading guid="_04344ae4-2ab1-4e8e-a2c4-3ea1985f0d94" id="sec.231-he">Disposal order</heading><subclause affected.by.uncommenced="0" guid="_17a3dbec-3745-4712-9833-4824b8836a3a" id="sec.231-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a court convicts a person of an offence against this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_076ba3f6-54d4-47de-8ed3-f70e3f564ac3" id="sec.231-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The court may make an order (a <defterm guid="_2e37df39-5a6c-4b18-96ba-f715e076e218" id="sec.231-def.disposalorder" type="definition">disposal order</defterm>), on its own initiative or on an application by the prosecution, for the disposal of any of the following things owned by the person—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_840f66ee-b6d3-40d2-abdc-90a67fd929e6" id="sec.231-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">anything that was the subject of, or used to commit, the offence;</txt></block></li><li guid="_b9573bd5-aea4-4878-9cfa-efb781ad7df6" id="sec.231-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">another thing the court considers is likely to be used by the person or another person in committing a further offence against this Act.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2097ed7d-3237-49b4-86f9-5110742b5f0a" id="sec.231-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The court may make a disposal order for a thing—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b42fc7c9-0e1b-4cca-ab5f-68cef798fe3f" id="sec.231-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">whether or not it has been seized under this Act; and</txt></block></li><li guid="_674b821f-c373-40c3-b19e-3465f5c3f901" id="sec.231-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the thing has been seized—whether or not it has been returned to the former owner.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b62ec49f-4808-43c5-8c2c-a9cb61ae47a4" id="sec.231-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In deciding whether to make a disposal order for a thing, the court—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b482a022-28c9-40d6-b965-677c46bb7c5b" id="sec.231-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">may require notice to be given to anyone the court considers appropriate, including, for example, any person who may have any property in the thing; and</txt></block></li><li guid="_9575ac19-abfb-4de0-a206-6d8aae993659" id="sec.231-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">must hear any submissions that any person claiming to have any property in the thing may wish to make.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ac1fb840-c00c-4467-bb9d-56f86d2c977c" id="sec.231-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The court may make any order to enforce the disposal order that it considers appropriate.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fef7fe19-c46d-4efb-a1f1-5445b469d56c" id="sec.231-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">This section does not limit the court’s powers under another law.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_2c73105d-5ac1-4520-8cc6-2203de9efe3d" id="ch.10-pt.4-div.5"><no>Division 5</no><heading guid="_aaa95a1c-8946-4a62-ae57-bb9ab0849263" id="ch.10-pt.4-div.5-he">Other information-obtaining powers</heading><clause affected.by.uncommenced="0" guid="_66fc4434-714f-4621-abf6-e2851b9852c4" id="sec.232" provision.type="other" spent.amends="0"><no>232</no><heading guid="_c415461d-24bd-4293-b03d-ef9c858b9771" id="sec.232-he">Power to require name and address</heading><subclause affected.by.uncommenced="0" guid="_dec0acfa-4624-4ffe-bd83-2543eaccd3ce" id="sec.232-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if an authorised person—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_38212f89-cbb6-4836-b6be-ef97c09b242d" id="sec.232-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">finds a person committing an offence against this Act or contravening a prescribed provision; or</txt></block></li><li guid="_a538ee3e-a625-4f3d-b070-cdc6483a5ea0" id="sec.232-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">finds a person in circumstances that lead the authorised person to reasonably suspect the person has just committed an offence against this Act or contravened a prescribed provision; or</txt></block></li><li guid="_917d374e-b799-4b13-aa2d-9a3313fa51e4" id="sec.232-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">has information that leads the authorised person to reasonably suspect a person has just committed an offence against this Act or contravened a prescribed provision.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_fa6a5750-2e11-46f6-be55-bf1070692ec2" id="sec.232-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The authorised person may require the person to state the person’s name and address.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_17bbe047-5fe6-447e-94ae-ad5de486ce69" id="sec.232-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The authorised person may also require the person to give evidence of the correctness of the stated name or address if, in the circumstances, it would be reasonable to expect the person to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2f9af1db-f4bf-4969-8dc1-133b338c0075" id="sec.232-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in possession of evidence of the correctness of the stated name or address; or</txt></block></li><li guid="_baacdaea-7cd7-4c23-90df-a337df1fec50" id="sec.232-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise be able to give the evidence.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8206439f-e008-4412-b9dc-3194816310e3" id="sec.232-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">When making a personal details requirement, the authorised person must give the person an offence warning for the requirement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0dee309b-b712-42df-9429-d0d08420b311" id="sec.232-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">A requirement under this section is a <defterm guid="_80b3f5f2-90fc-474b-a3eb-dff4a1747ed9" id="sec.232-def.personaldetailsrequirement" type="definition">personal details requirement</defterm>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_37e8e918-f752-4e7e-b8d5-c7abe184752b" id="sec.232-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_9310e212-e28d-4938-97a6-8a1edee62ff5" id="sec.232-ssec.6-def.address_"><txt break.before="1"><defterm guid="_582efe5d-a8da-4078-91dc-9e83c2ea3f94" id="sec.232-ssec.6-def.address" type="definition">address</defterm>, of a person, includes the person’s residential and business address and, for a person temporarily in Queensland, includes the place where the person is living in Queensland.</txt></definition><definition affected.by.uncommenced="0" guid="_4f0472ea-6262-4018-8797-dfad2b4e7ff4" id="sec.232-ssec.6-def.prescribedprovision_"><txt break.before="1"><defterm guid="_62216c59-ffcc-4ac6-9edd-82210934bb78" id="sec.232-ssec.6-def.prescribedprovision" type="definition">prescribed provision</defterm> means <intref check="valid" refid="sec.107" target.guid="_73a3990f-ec42-4086-8690-6fcd166c1cb1">section 107</intref><intref check="valid" refid="sec.107-ssec.1" target.guid="_7ed3da33-3360-441c-9033-b8dff3bc9a9e">(1)</intref>, <intref check="valid" refid="sec.108" target.guid="_afdf6b20-9947-4872-b5f3-4a2e3f0b7d14">108</intref> or <intref check="valid" refid="sec.109" target.guid="_5fc9936f-86fd-43f3-ae76-8cb76bb42ccf">109</intref><intref check="valid" refid="sec.109-ssec.1" target.guid="_8358d163-5502-45f2-ac34-0acee885ad5b">(1)</intref> or <intref check="valid" refid="sec.109-ssec.2" target.guid="_7b56e555-6367-4d50-b30e-01357311af8d">(2)</intref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_43ddf72d-4522-4a6b-8d81-7e89e332c6d0" id="sec.233" provision.type="other" spent.amends="0"><no>233</no><heading guid="_bf0373b0-a1e5-41c5-9711-c06ce4c3076c" id="sec.233-he">Offence to contravene personal details requirement</heading><subclause affected.by.uncommenced="0" guid="_0497c9a0-f9dd-4d2b-8e33-b29f1ddb4669" id="sec.233-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person of whom a personal details requirement has been made must comply with the requirement unless the person has a reasonable excuse.</txt></block><penalty guid="_11af7c6d-b54a-4329-8de8-d697977021a9" id="sec.233-ssec.1-pen"><block><txt break.before="1">Maximum penalty—50 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_13d47ed7-7e09-4d97-a8a3-41fa549c9978" id="sec.233-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A person may not be convicted of an offence under <intref check="valid" refid="sec.233-ssec.1" target.guid="_0497c9a0-f9dd-4d2b-8e33-b29f1ddb4669">subsection (1)</intref> unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e71d007f-4323-4005-b6a8-fb30cc8bba39" id="sec.233-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the person is found guilty of the offence in relation to which the personal details requirement was made; or</txt></block></li><li guid="_ba54fd15-72fb-41f8-a6f5-7daf7523d28a" id="sec.233-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the personal details requirement was made in relation to a contravention of a prescribed provision mentioned in <intref check="valid" refid="sec.232" target.guid="_66fc4434-714f-4621-abf6-e2851b9852c4">section 232</intref>—the court is satisfied beyond reasonable doubt that the person contravened the prescribed provision.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3d7d3070-4795-44f3-a13d-044c7151c49e" id="sec.234" provision.type="other" spent.amends="0"><no>234</no><heading guid="_d61fb1fe-129b-4832-9fb9-4295ce521b4b" id="sec.234-he">Power to require production of document</heading><subclause affected.by.uncommenced="0" guid="_3120f23c-9143-4424-bb2b-1ddf6f1e20f7" id="sec.234-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An authorised person may require a person to make available for inspection by an authorised person, or to produce to the authorised person for inspection, at a reasonable time and place nominated by the authorised person—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d08441a5-522f-4654-a2ea-938a229c60cf" id="sec.234-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a document issued to the person under this Act or required to be kept by the person under this Act; or</txt></block></li><li guid="_3c21cbfc-f20a-4087-9452-964844f3e3a1" id="sec.234-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if a document or information required to be kept by a person under this Act is stored or recorded by means of a device—a document that is a clear written reproduction of the stored or recorded document or information.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8cf4a172-34c9-4ed1-8483-05d22d18007a" id="sec.234-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A requirement under <intref check="valid" refid="sec.234-ssec.1" target.guid="_3120f23c-9143-4424-bb2b-1ddf6f1e20f7">subsection (1)</intref> is a <defterm guid="_818f9a2e-bb64-40ba-82fa-39b773ba65ec" id="sec.234-def.documentproductionrequirement" type="definition">document production requirement</defterm>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_18ae374c-033f-4f31-9801-82ded31539d7" id="sec.234-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For an electronic document, compliance with the document production requirement requires the making available or production of a clear written reproduction of the electronic document.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5dcf9c27-34fc-4e60-aa41-59d26eb29ffd" id="sec.234-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The authorised person may keep the document to copy it.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c8eaf0fb-2037-4a08-8624-9b11abe5f2c1" id="sec.234-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the authorised person copies the document, or an entry in the document, the authorised person may require the person responsible for keeping the document to certify the copy as a true copy of the document or entry.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2481fa86-660c-4f99-9197-25306a5c2ff9" id="sec.234-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">A requirement under <intref check="valid" refid="sec.234-ssec.5" target.guid="_c8eaf0fb-2037-4a08-8624-9b11abe5f2c1">subsection (5)</intref> is a <defterm guid="_e4844ed7-8713-4b40-9480-63e2312078a2" id="sec.234-def.documentcertificationrequirement" type="definition">document certification requirement</defterm>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_de3637a4-cebf-48dc-bcde-56d0c4d603f6" id="sec.234-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">The authorised person must return the document to the person as soon as practicable after copying it.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_61a08828-0f81-4892-ae30-c0f7c9d4062d" id="sec.234-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">However, if a document certification requirement is made of a person, the authorised person may keep the document until the person complies with the requirement.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3458ec4a-9fbf-450b-b249-7304baae9da0" id="sec.235" provision.type="other" spent.amends="0"><no>235</no><heading guid="_df6691bc-937b-44fd-9d9b-b5e8b98bc77e" id="sec.235-he">Offence to contravene document production requirement</heading><subclause affected.by.uncommenced="0" guid="_e3081877-93ae-4b2b-866b-3ffb20dfe5df" id="sec.235-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person of whom a document production requirement has been made must comply with the requirement unless the person has a reasonable excuse.</txt></block><penalty guid="_e4eef410-bcc6-46d0-92de-537920d7b1ae" id="sec.235-ssec.1-pen"><block><txt break.before="1">Maximum penalty—60 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_986a398b-9b52-4774-94d9-fdeb38750332" id="sec.235-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">It is a reasonable excuse for an individual not to comply with a document production requirement if complying might tend to incriminate the individual or expose the individual to a penalty.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1a1af5f5-d9c4-4811-9617-62e3e4cc0e20" id="sec.235-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.235-ssec.2" target.guid="_986a398b-9b52-4774-94d9-fdeb38750332">subsection (2)</intref> does not apply if a document or information the subject of the document production requirement is required to be held or kept by the person under this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_19a4e351-76c9-425d-a931-d51ac04ef115" id="sec.235-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If a court convicts a person of an offence against <intref check="valid" refid="sec.235-ssec.1" target.guid="_e3081877-93ae-4b2b-866b-3ffb20dfe5df">subsection (1)</intref>, the court may, as well as imposing a penalty for the offence, order the person to comply with the document production requirement.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_6503029f-5575-4ed3-a5a4-50bd249b46d3" id="sec.236" provision.type="other" spent.amends="0"><no>236</no><heading guid="_017124ca-c86d-4c95-ba6a-8790d0c61874" id="sec.236-he">Offence to contravene document certification requirement</heading><subclause affected.by.uncommenced="0" guid="_a30926f4-67fa-419c-b604-4cf8de2f11f8" id="sec.236-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person of whom a document certification requirement has been made must comply with the requirement unless the person has a reasonable excuse.</txt></block><penalty guid="_99019205-42ec-4d5f-82b6-8dc7c6c40039" id="sec.236-ssec.1-pen"><block><txt break.before="1">Maximum penalty—50 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_c5a796cc-206e-4ca0-a021-93a9760ed1bb" id="sec.236-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">It is a reasonable excuse for an individual not to comply with a document certification requirement if complying might tend to incriminate the individual or expose the individual to a penalty.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fca2c655-9aca-428b-8cf1-a7827fc32096" id="sec.236-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.236-ssec.2" target.guid="_c5a796cc-206e-4ca0-a021-93a9760ed1bb">subsection (2)</intref> does not apply if the document certification requirement relates to a document or information that is required to be held or kept by the person under this Act.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d177b638-c589-47aa-a23b-7a92dec8bcb1" id="sec.237" provision.type="other" spent.amends="0"><no>237</no><heading guid="_d8a1e318-0a45-4e41-b4b2-52a30c97615e" id="sec.237-he">Power to require information</heading><subclause affected.by.uncommenced="0" guid="_b440151a-7347-44e8-a4ea-ce399349d2ac" id="sec.237-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if an authorised person reasonably believes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2a61c75f-f8cd-4351-9122-7865893a697f" id="sec.237-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an offence against this Act has been committed; and</txt></block></li><li guid="_48200da0-f7ff-41cd-bf2d-eea4412df607" id="sec.237-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a person may be able to give information about the offence.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_73b1484a-8296-4800-a596-39b9deb2dbca" id="sec.237-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The authorised person may, by notice given to the person, require the person to give the authorised person information related to the offence at a stated reasonable time and place.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d52f04f9-9b56-42bd-8f51-19ecf539a12a" id="sec.237-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A requirement under <intref check="valid" refid="sec.237-ssec.2" target.guid="_73b1484a-8296-4800-a596-39b9deb2dbca">subsection (2)</intref> is an <defterm guid="_7c3b2fbd-c3f4-425d-9b6f-fe242cc3a3f4" id="sec.237-def.informationrequirement" type="definition">information requirement</defterm>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_296c1611-14fe-4a70-9ca6-92ec65179edf" id="sec.237-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">For information that is an electronic document, compliance with the information requirement requires the giving of a clear image or written version of the electronic document.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_15274bd9-dd70-4155-adf1-774afeec5872" id="sec.237-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_f4107e7e-03ff-4741-b46e-b9190b86c6ef" id="sec.237-ssec.5-def.information_"><txt break.before="1"><defterm guid="_54618909-1439-41ab-b742-9cc2c1993b98" id="sec.237-ssec.5-def.information" type="definition">information</defterm> includes a document.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_620b6c11-0bf8-4573-8f7e-7c970069777c" id="sec.238" provision.type="other" spent.amends="0"><no>238</no><heading guid="_3fd17f95-5e57-400d-b65e-18ec543e35e4" id="sec.238-he">Offence to contravene information requirement</heading><subclause affected.by.uncommenced="0" guid="_969892ab-ba7c-4c01-89b3-134f09882218" id="sec.238-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person of whom an information requirement is made must comply with the requirement unless the person has a reasonable excuse.</txt></block><penalty guid="_4035707f-bbfb-407c-8ad4-3cce723e53d2" id="sec.238-ssec.1-pen"><block><txt break.before="1">Maximum penalty—50 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_9f0d23eb-9095-4a64-8dfa-4b22dea88e30" id="sec.238-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">It is a reasonable excuse for an individual not to give the information if giving the information might tend to incriminate the individual or expose the individual to a penalty.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_d3949c2c-63b2-4444-9df9-0a2667ad1185" id="ch.10-pt.5"><no>Part 5</no><heading guid="_11187d53-fd46-4992-b551-574df3916f43" id="ch.10-pt.5-he">Miscellaneous provisions</heading><division affected.by.uncommenced="0" guid="_b41168ab-3365-43d5-8a06-cf6a1a936dd2" id="ch.10-pt.5-div.1"><no>Division 1</no><heading guid="_1dba7172-73a1-4eb0-a972-94f8f3026d4b" id="ch.10-pt.5-div.1-he">Damage</heading><clause affected.by.uncommenced="0" guid="_54ae140d-84a1-4b6f-b06b-52c921630311" id="sec.239" provision.type="other" spent.amends="0"><no>239</no><heading guid="_aae4c514-8e8f-4a78-8c0b-6c4c03c71501" id="sec.239-he">Duty to avoid inconvenience and minimise damage</heading><block><txt break.before="1">In exercising a power, an authorised person must take all reasonable steps to cause as little inconvenience, and do as little damage, as possible.</txt><note guid="_4bebcad1-004e-4224-a771-67739873abfe" id="sec.239-note" type="example"><heading guid="_afd77dc1-ab6e-4134-a09c-f502ff25b7a1" id="sec.239-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.241" target.guid="_5c802fc9-043f-4028-8e4e-68052cddda34">section 241</intref>.</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_1491d8c2-b17d-418b-8ac5-ec9b167a21eb" id="sec.240" provision.type="other" spent.amends="0"><no>240</no><heading guid="_d015d665-88db-4bfd-b250-cde856e03790" id="sec.240-he">Notice of damage</heading><subclause affected.by.uncommenced="0" guid="_f219c4c4-d990-4271-9e72-1efac5c5b5ee" id="sec.240-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5dd3d081-6eb1-4bd2-9ef8-1850a1315129" id="sec.240-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an authorised person damages something when exercising, or purporting to exercise, a power; or</txt></block></li><li guid="_8d987b3d-3e54-434c-b213-1177caa344cf" id="sec.240-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a person (the <defterm guid="_d81b6762-7b76-4efc-ad8a-fb7e6931ddd8" id="sec.240-ssec.1-def.assistant" type="definition">assistant</defterm>) acting under the direction or authority of an authorised person damages something.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b04c2ea7-1a81-4b51-8ee3-e4f52f243a7b" id="sec.240-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, this section does not apply to damage the authorised person reasonably considers is trivial or if the authorised person reasonably believes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_36c55e6d-904b-4bd2-b28a-17171d85a0ad" id="sec.240-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">there is no-one apparently in possession of the thing; or</txt></block></li><li guid="_895d5a51-854a-4a3e-a7eb-66ad93370542" id="sec.240-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the thing has been abandoned.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c9320e95-a5be-4a44-8293-9b45d4ec6139" id="sec.240-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The authorised person must give notice of the damage to a person who appears to the authorised person to be an owner, or person in control, of the thing.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d68b3c95-0117-4b89-b322-bc1d58a32f68" id="sec.240-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, if for any reason it is not practicable to comply with <intref check="valid" refid="sec.240-ssec.3" target.guid="_c9320e95-a5be-4a44-8293-9b45d4ec6139">subsection (3)</intref>, the authorised person must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_95ac6246-0b1c-4c49-a9f7-b4dc8233b26d" id="sec.240-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">leave the notice at the place where the damage happened; and</txt></block></li><li guid="_0b05a5bd-1cc7-48eb-8744-860d076d5a49" id="sec.240-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">ensure it is left in a conspicuous position and in a reasonably secure way.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e02d759a-2d2e-4293-9fec-af165766d0c4" id="sec.240-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The authorised person may delay complying with <intref check="valid" refid="sec.240-ssec.3" target.guid="_c9320e95-a5be-4a44-8293-9b45d4ec6139">subsection (3)</intref> or <intref check="valid" refid="sec.240-ssec.4" target.guid="_d68b3c95-0117-4b89-b322-bc1d58a32f68">(4)</intref> if the authorised person reasonably suspects complying with the subsection may frustrate or otherwise hinder the performance of the authorised person’s functions.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e9dc5b83-9b25-47f2-852c-60fd0ccfd706" id="sec.240-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The delay may be only for so long as the authorised person continues to have the reasonable suspicion and remains in the vicinity of the place.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_339441a2-17f3-4367-9eff-385fb5add719" id="sec.240-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">If the authorised person believes the damage was caused by a latent defect in the thing or circumstances beyond the control of the authorised person or the assistant, the authorised person may state the belief in the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4747822a-1812-403a-ab54-570834eb38f0" id="sec.240-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">The notice must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d4cca044-707f-4350-93f9-d20819a6a62a" id="sec.240-ssec.8-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">particulars of the damage; and</txt></block></li><li guid="_f976d803-a394-414d-a881-a6d3386bbb4a" id="sec.240-ssec.8-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that the person who suffered the damage may claim compensation under <intref check="valid" refid="sec.241" target.guid="_5c802fc9-043f-4028-8e4e-68052cddda34">section 241</intref>.</txt></block></li></list></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_a9a9c7ef-3442-4aa1-ad28-846c65c8759f" id="ch.10-pt.5-div.2"><no>Division 2</no><heading guid="_4e49d906-8291-485c-bd46-b86a1f578981" id="ch.10-pt.5-div.2-he">Compensation</heading><clause affected.by.uncommenced="0" guid="_5c802fc9-043f-4028-8e4e-68052cddda34" id="sec.241" provision.type="other" spent.amends="0"><no>241</no><heading guid="_0345b4a6-d5cc-4cce-b142-141185c9e677" id="sec.241-he">Compensation</heading><subclause affected.by.uncommenced="0" guid="_c8b1015c-7d9b-40f7-ae6b-4358b78dd953" id="sec.241-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person may claim compensation from the State if the person incurs loss because of the exercise, or purported exercise, of a power by or for an authorised person including a loss arising from compliance with a requirement made of the person under this chapter.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_565fb35f-1bc3-4072-837a-6faf4b80344a" id="sec.241-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.241-ssec.1" target.guid="_c8b1015c-7d9b-40f7-ae6b-4358b78dd953">subsection (1)</intref> does not include loss arising from a lawful seizure.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_87567eb0-e0d3-4eed-9738-772063fa8fa1" id="sec.241-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The compensation may be claimed and ordered in a proceeding—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9fbd1acd-cd18-4d0b-8c13-aa6db858436e" id="sec.241-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">brought in a court with jurisdiction for the recovery of the amount of compensation claimed; or</txt></block></li><li guid="_76cf091b-b315-49ea-b03d-0ecf977fb2db" id="sec.241-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for an alleged offence against this Act the investigation of which gave rise to the claim for compensation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_44e9a1ff-75fe-41cc-ab5e-e71006f12057" id="sec.241-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A court may order the payment of compensation only if it is satisfied it is just to make the order in the circumstances of the particular case.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3c6d17ad-f433-4e39-8c4f-f8302aeedb77" id="sec.241-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In considering whether it is just to order compensation, the court must have regard to any relevant offence committed by the claimant.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7c15a388-d44f-4fb7-8c43-31ac1207d268" id="sec.241-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">A regulation may prescribe other matters that may, or must, be taken into account by the court when considering whether it is just to order compensation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_aa6eb02a-a29e-4f03-b095-6e7bb6f9e390" id="sec.241-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0"><intref check="valid" refid="sec.239" target.guid="_54ae140d-84a1-4b6f-b06b-52c921630311">Section 239</intref> does not provide for a statutory right of compensation other than as is provided by this section.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c457cbab-d177-43ee-ae32-3ff5d864c7f4" id="sec.241-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_8939c57b-ad4e-4fbb-9e8b-679784eb28d0" id="sec.241-ssec.8-def.loss_"><txt break.before="1"><defterm guid="_fc489dff-bcaf-4f4d-8b58-027923e8bbb3" id="sec.241-ssec.8-def.loss" type="definition">loss</defterm> includes costs and damage.</txt></definition></deflist></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_e6a7821b-f817-4d0b-b2ed-f8280417c189" id="ch.10-pt.5-div.3"><no>Division 3</no><heading guid="_b92a9d7e-4cf9-4c2a-af34-55dff0858fd8" id="ch.10-pt.5-div.3-he">Other offences relating to authorised persons</heading><clause affected.by.uncommenced="0" guid="_681b5740-b36c-47c3-8394-260f4f4f60fb" id="sec.242" provision.type="other" spent.amends="0"><no>242</no><heading guid="_c1337840-1ebe-4f82-9e8c-414840e3a8b6" id="sec.242-he">Giving authorised person false or misleading information</heading><subclause affected.by.uncommenced="0" guid="_f9ccb7e2-560e-4f0a-82be-1d5c7d0721a3" id="sec.242-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not, in relation to the administration of this Act, give an authorised person information, or a document containing information, that the person knows is false or misleading in a material particular.</txt></block><penalty guid="_8f75ac81-1fdd-45c0-b32a-60f3fd081320" id="sec.242-ssec.1-pen"><block><txt break.before="1">Maximum penalty—1,665 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_71c32870-998f-406d-85a0-b870949cfbdb" id="sec.242-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.242-ssec.1" target.guid="_f9ccb7e2-560e-4f0a-82be-1d5c7d0721a3">Subsection (1)</intref> applies to information or a document given in relation to the administration of this Act whether or not the information or document was given in response to a specific power under this Act.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7700d32c-9518-4706-b728-6b3057a50858" id="sec.243" provision.type="other" spent.amends="0"><no>243</no><heading guid="_ddc833f2-2827-483a-86e0-9e23cd0596b5" id="sec.243-he">Obstructing authorised person</heading><subclause affected.by.uncommenced="0" guid="_1e790c24-ca56-42f5-8678-4db8b287abc8" id="sec.243-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not obstruct an authorised person, or someone helping an authorised person, exercising a power under this Act unless the person has a reasonable excuse.</txt></block><penalty guid="_fdc12399-7b8e-4a86-92ad-cd2b37df9d50" id="sec.243-ssec.1-pen"><block><txt break.before="1">Maximum penalty—165 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_5dffb345-a21c-4066-bad7-21fa6fd82d14" id="sec.243-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If a person has obstructed an authorised person, or someone helping an authorised person, and the authorised person decides to proceed with the exercise of the power, the authorised person must warn the person that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e7024f0e-2d35-48ec-83d7-2dc70f4815ef" id="sec.243-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">it is an offence to cause an obstruction unless the person has a reasonable excuse; and</txt></block></li><li guid="_c2d59e1e-9d53-4fe5-9f68-bfb03639b8a0" id="sec.243-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the authorised person considers the person’s conduct an obstruction.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6ce8172b-2abc-4f4b-9fc7-3c2d0eb40de5" id="sec.243-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_bfb2a668-34f9-4315-8f3e-324972f6ea53" id="sec.243-ssec.3-def.obstruct_"><txt break.before="1"><defterm guid="_05eb48fb-7400-4dff-95e3-16983a07c472" id="sec.243-ssec.3-def.obstruct" type="definition">obstruct</defterm> includes assault, hinder, resist, attempt to obstruct and threaten to obstruct.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a5e2c100-b6ec-4f24-a575-bd7da5d79492" id="sec.244" provision.type="other" spent.amends="0"><no>244</no><heading guid="_c40bea08-a0bf-43e2-8afd-153f7fb09220" id="sec.244-he">Impersonating authorised person</heading><block><txt break.before="1">A person must not impersonate an authorised person.</txt></block><penalty guid="_2372e210-4c66-49fe-8ac1-b1973b585845" id="sec.244-pen"><block><txt break.before="1">Maximum penalty—50 penalty units.</txt></block></penalty></clause></division></part></chapter><chapter affected.by.uncommenced="0" guid="_e6645484-8c0c-4512-9bf9-7a0ca2fe74f1" id="ch.11"><no>Chapter 11</no><heading guid="_a28e7d3a-b08d-4653-91ec-0b16e4289087" id="ch.11-he">Show cause notices and compliance notices</heading><part affected.by.uncommenced="0" guid="_a5bc3fdc-20e3-4d54-8874-adb7673f340b" id="ch.11-pt.1"><no>Part 1</no><heading guid="_5f61c907-901f-4886-8cf3-685b9fd26f4d" id="ch.11-pt.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_6aa8e51c-3b29-4452-b45a-4568902296cc" id="sec.245" provision.type="other" spent.amends="0"><no>245</no><heading guid="_d7e7ecf9-18d3-4161-b010-b56764b543da" id="sec.245-he">Definitions for chapter</heading><block><txt break.before="1">In this chapter—</txt><deflist><definition affected.by.uncommenced="0" guid="_92ef1db9-33a4-443e-b081-8bf6573fc792" id="sec.245-def.compliancenotice_"><txt break.before="1"><defterm guid="_7b986069-85ae-4b0f-89f6-8adb13c2bac3" id="sec.245-def.compliancenotice" type="definition">compliance notice</defterm> see <intref check="valid" refid="sec.248" target.guid="_5569ad89-ef45-48f4-b562-b3a4aea9387b">section 248</intref><intref check="valid" refid="sec.248-ssec.1" target.guid="_cf1943c9-2b4b-4595-b11e-136c9f63dcf6">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_c65f6d71-8632-434a-97a5-e7b398f4b0a3" id="sec.245-def.prescribedprovision_"><txt break.before="1"><defterm guid="_26385d97-0410-414f-8036-581e86cc5d22" id="sec.245-def.prescribedprovision" type="definition">prescribed provision</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4833cbfa-d0d3-4d7c-923d-5a2001cf6353" id="sec.245-def.prescribedprovision-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0"><intref check="valid" refid="sec.38" target.guid="_d9f9a129-e415-459a-b7ef-1b4ae2542291">section 38</intref>, <intref check="valid" refid="sec.53" target.guid="_f86b8d4b-010d-4c7b-83cf-00c6cb4be065">53</intref><intref check="valid" refid="sec.53-ssec.2" target.guid="_5a8388b6-2afa-49de-b2a2-391f931857d4">(2)</intref>, <intref check="valid" refid="sec.54" target.guid="_a0ffb14c-be84-401b-a7d8-b15021049659">54</intref><intref check="valid" refid="sec.54-ssec.2" target.guid="_8727b9db-5311-434e-a17f-51b7026b6fc0">(2)</intref>, <intref check="valid" refid="sec.57" target.guid="_bd3e7a2f-7827-447c-836a-41ca94f9cf4f">57</intref><intref check="valid" refid="sec.57-ssec.2" target.guid="_4ec501ec-697e-48dd-8f3c-9d9d0707614d">(2)</intref> or <intref check="valid" refid="sec.57-ssec.3" target.guid="_f9eb39a1-4e79-49fb-8f83-db64b18b8a60">(3)</intref>, <intref check="valid" refid="sec.58" target.guid="_389f50f8-6a50-4fc6-82b5-03dc71fa4534">58</intref><intref check="valid" refid="sec.58-ssec.2" target.guid="_1090ac38-cafb-430b-bf43-f045d94af667">(2)</intref>, <intref check="valid" refid="sec.60" target.guid="_6b758c45-59e4-4c54-a187-7dd0e64f5df2">60</intref><intref check="valid" refid="sec.60-ssec.2" target.guid="_7c06ce4a-c72c-46fe-b2c8-e80c721baa68">(2)</intref>, <intref check="valid" refid="sec.60-ssec.4" target.guid="_d1d3a074-6d0e-465a-93ce-2ccf0ebc7737">(4)</intref> or <intref check="valid" refid="sec.60-ssec.6" target.guid="_5666ac22-639c-4ed9-8416-49ba2e2a85c0">(6)</intref>, <intref check="valid" refid="sec.61" target.guid="_70b550db-f7c0-4d9e-9f5c-43a6756d09b9">61</intref><intref check="valid" refid="sec.61-ssec.2" target.guid="_72ada995-52a6-453a-b663-5f6459e43d3c">(2)</intref> or <intref check="valid" refid="sec.61-ssec.3" target.guid="_28737b71-b41a-4151-960a-4724cecac5f8">(3)</intref>, <intref check="valid" refid="sec.63" target.guid="_96adeb33-f091-4c60-a7ed-0372dc95cf90">63</intref><intref check="valid" refid="sec.63-ssec.4" target.guid="_6000d753-f1d3-46b5-b4aa-c5eaa52b1786">(4)</intref>, <intref check="valid" refid="sec.64" target.guid="_ce9a99f8-30c8-4c16-b554-47cc4819dcd6">64</intref><intref check="valid" refid="sec.64-ssec.2" target.guid="_2fd69e3c-2541-4818-8ea3-5b61b1b9290f">(2)</intref>, <intref check="valid" refid="sec.66" target.guid="_ecdde173-d7d4-4dca-84a0-d560a3858def">66</intref><intref check="valid" refid="sec.66-ssec.2" target.guid="_88a2720f-514d-48d4-bc95-bfc0d6c3810a">(2)</intref>, <intref check="valid" refid="sec.67" target.guid="_1d60a32d-8f3f-4c74-b128-ed801dc77562">67</intref><intref check="valid" refid="sec.67-ssec.1" target.guid="_f9bd9494-6402-47bd-8566-8b7b1ba77005">(1)</intref>, <intref check="valid" refid="sec.68" target.guid="_504b9a69-4416-406c-9fcb-ee6a8ce7fb0b">68</intref><intref check="valid" refid="sec.68-ssec.2" target.guid="_5348304b-a43d-4554-9b24-87b4bd331114">(2)</intref>, <intref check="valid" refid="sec.69" target.guid="_8574fffe-fc1f-4b78-a4b5-cd19e953febb">69</intref><intref check="valid" refid="sec.69-ssec.2" target.guid="_906cab4d-a709-49ac-9064-a334ff9f1133">(2)</intref>, <intref check="valid" refid="sec.72" target.guid="_d30e771f-e48c-4292-86ed-c1b4fb7d03e1">72</intref><intref check="valid" refid="sec.72-ssec.1" target.guid="_ba53cadb-d2d7-444e-889c-bf6ae38c6fe8">(1)</intref>, <intref check="valid" refid="sec.72A" target.guid="_77f1a5af-3ef5-4da6-abff-20dcb185001c">72A</intref>, <intref check="valid" refid="sec.72X" target.guid="_2f977b6e-f533-45f7-a7e3-a5d9b1bc5b14">72X</intref>, <intref check="valid" refid="sec.72Y" target.guid="_c86b8c3f-a9f0-499e-8a55-07c0716cc048">72Y</intref><intref check="valid" refid="sec.72Y-ssec.2" target.guid="_534deb3c-cfea-418e-b7e6-b7d0c4a8016b">(2)</intref>, <intref check="valid" refid="sec.72Z" target.guid="_7afd9761-9b3c-4b65-b873-e42fd9374ab0">72Z</intref><intref check="valid" refid="sec.72Z-ssec.2" target.guid="_ad6014bb-a0f8-48b1-bd11-0e4d5e38e880">(2)</intref>, <intref check="valid" refid="sec.73A" target.guid="_2f0595c2-9cf6-40db-ae33-ed59d3b55428">73A</intref><intref check="valid" refid="sec.73A-ssec.2" target.guid="_0b6d7fc5-2edc-4b80-a947-0107f1b0fccc">(2)</intref>, 99GD(1), 99GE, 99GF(2), 99GG(3), 99GH,<intref check="valid" refid="sec.99Q" target.guid="_0401784c-4961-40ee-a048-bb61424f111b"> 99Q</intref><intref check="valid" refid="sec.99Q-ssec.3" target.guid="_51710358-c32f-4977-a592-bd71544d1c75">(3)</intref>, <intref check="valid" refid="sec.99ZB" target.guid="_3f3710bc-b74e-406e-b37d-eec74c64a49b">99ZB</intref><intref check="valid" refid="sec.99ZB-ssec.3" target.guid="_d7f55868-95fd-4d3a-8386-470de9ad0686">(3)</intref>, <intref check="valid" refid="sec.99ZH" target.guid="_b3d0da38-a504-43c2-980a-de3f8d4f45dc">99ZH</intref><intref check="valid" refid="sec.99ZH-ssec.3" target.guid="_9792b642-47a9-47e3-8ebd-ed88fc1c60c4">(3)</intref>, <intref check="valid" refid="sec.99ZM" target.guid="_4b65b796-eb3c-44bc-9c13-b04206720dba">99ZM</intref><intref check="valid" refid="sec.99ZM-ssec.1" target.guid="_ccc3996c-89dc-40c4-93ca-0a02f8ec53f4">(1)</intref>, <intref check="valid" refid="sec.101" target.guid="_2235935f-e276-4573-ac77-6388955d7507">101</intref>, <intref check="valid" refid="sec.103" target.guid="_88ee3b31-e48a-4927-89f5-5ffb72f072b6">103</intref><intref check="valid" refid="sec.103-ssec.1" target.guid="_955200d4-8fb9-4cae-9c63-97b3252973a4">(1)</intref>, <intref check="valid" refid="sec.104" target.guid="_428f4a48-281f-4088-8124-b981fb6fd86a">104</intref><intref check="valid" refid="sec.104-ssec.1" target.guid="_d4b52884-8745-4059-bece-7159bd221cc0">(1)</intref>, <intref check="valid" refid="sec.107" target.guid="_73a3990f-ec42-4086-8690-6fcd166c1cb1">107</intref><intref check="valid" refid="sec.107-ssec.1" target.guid="_7ed3da33-3360-441c-9033-b8dff3bc9a9e">(1)</intref>, <intref check="valid" refid="sec.108" target.guid="_afdf6b20-9947-4872-b5f3-4a2e3f0b7d14">108</intref>, <intref check="valid" refid="sec.109" target.guid="_5fc9936f-86fd-43f3-ae76-8cb76bb42ccf">109</intref><intref check="valid" refid="sec.109-ssec.1" target.guid="_8358d163-5502-45f2-ac34-0acee885ad5b">(1)</intref> or <intref check="valid" refid="sec.109-ssec.2" target.guid="_7b56e555-6367-4d50-b30e-01357311af8d">(2)</intref>, <intref check="valid" refid="sec.112" target.guid="_d18a5e1e-6442-4800-97a4-2e85f6b14c40">112</intref><intref check="valid" refid="sec.112-ssec.2" target.guid="_07ba320b-8e88-48dd-bc93-aae7ad462729">(2)</intref>, <intref check="valid" refid="sec.141" target.guid="_a759607e-d125-46b1-ada8-e06af4da1c41">141</intref><intref check="valid" refid="sec.141-ssec.3" target.guid="_e927dd6b-e078-4b9e-891c-8a300da61ef3">(3)</intref>, <intref check="valid" refid="sec.149" target.guid="_49fc724a-0dfa-4eb9-ae32-6874a12eac76">149</intref><intref check="valid" refid="sec.149-ssec.1" target.guid="_8eba44b8-aefa-4abd-8e84-794ebd6f3fdc">(1)</intref>, <intref check="valid" refid="sec.152" target.guid="_12fd2811-c61c-4e82-90c5-b7c0eb71d4a8">152</intref><intref check="valid" refid="sec.152-ssec.2" target.guid="_19293132-e47e-4584-9f29-d32d266416a5">(2)</intref>, <intref check="valid" refid="sec.158" target.guid="_127325aa-09ca-453b-90f0-03554827f07c">158</intref><intref check="valid" refid="sec.158-ssec.1" target.guid="_04b24a97-d5e7-4d55-a995-a3ff3596ba87">(1)</intref> or <intref check="valid" refid="sec.158-ssec.2" target.guid="_909941b8-6640-44cb-91ec-e8747348e2be">(2)</intref>, <intref check="valid" refid="sec.173K" target.guid="_c36de416-fa8f-4e20-bd01-066635122f5b">173K</intref><intref check="valid" refid="sec.173K-ssec.2" target.guid="_dbd5cf41-db62-44d8-8caa-22104b1ad697">(2)</intref>, <intref check="valid" refid="sec.301E" target.guid="_f6c74cfc-b561-42d8-bb9d-691f686cb0b8">301E</intref> or <intref check="valid" refid="sec.301F" target.guid="_77e2f247-aab4-4f3d-b2e0-558669574f86">301F</intref>; or</txt></block></li><li guid="_b9033763-78d2-4723-adfa-ffbdace6ca9b" id="sec.245-def.prescribedprovision-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a provision of <intref check="valid" refid="ch.4" target.guid="_d097040d-7d09-4509-a319-3458078dbcf6">chapter 4</intref>, <intref check="valid" refid="ch.4-pt.5" target.guid="_f76bac62-fb51-496d-9f22-9cbcfa27127c">part 5</intref>, <intref check="valid" refid="ch.4-pt.5-div.5" target.guid="_0482837e-ad60-4644-820f-75cd0bb0924c">division 5</intref>; or</txt></block></li><li guid="_bd15c982-bf1d-4c20-b1e6-1d4055600c0c" id="sec.245-def.prescribedprovision-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a provision of a regulation prescribed for the purpose of this paragraph.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_03490822-8947-4d95-ae0f-f40fe94942b7" id="sec.245-def.showcausenotice_"><txt break.before="1"><defterm guid="_aaa4cdec-1aa5-406d-85f5-f0cae092d0fb" id="sec.245-def.showcausenotice" type="definition">show cause notice</defterm> see <intref check="valid" refid="sec.246" target.guid="_a4635f5c-fd6a-4bc9-bc30-84398aee1eef">section 246</intref><intref check="valid" refid="sec.246-ssec.2" target.guid="_fc72d696-3b76-4fc2-93cd-a9f48387468e">(2)</intref>.</txt></definition></deflist></block></clause></part><part affected.by.uncommenced="0" guid="_78d47dc4-b9b4-48c3-a36b-5cd0101ac111" id="ch.11-pt.2"><no>Part 2</no><heading guid="_39ffa789-65bf-42ca-b855-83d001850b43" id="ch.11-pt.2-he">Show cause notices</heading><clause affected.by.uncommenced="0" guid="_a4635f5c-fd6a-4bc9-bc30-84398aee1eef" id="sec.246" provision.type="other" spent.amends="0"><no>246</no><heading guid="_37bd15d3-7ef3-471b-9cbd-d8f58338acd0" id="sec.246-he">Giving show cause notice</heading><subclause affected.by.uncommenced="0" guid="_442df45f-07e4-4039-90a0-1677ca37649c" id="sec.246-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the chief executive reasonably believes a person has contravened a prescribed provision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fc72d696-3b76-4fc2-93cd-a9f48387468e" id="sec.246-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Before giving a compliance notice about the contravention, the chief executive must give the person a notice (a <defterm guid="_2d9cebb2-ed10-4d3b-84de-24b92a5253c5" id="sec.246-def.showcausenotice" type="definition">show cause notice</defterm>) inviting the person to show cause why the compliance notice should not be given.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1d2ef936-2bda-413c-a9f4-17a0796c17fc" id="sec.246-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Despite <intref check="valid" refid="sec.246-ssec.2" target.guid="_fc72d696-3b76-4fc2-93cd-a9f48387468e">subsection (2)</intref>, the chief executive need not give a show cause notice if the chief executive reasonably considers it is not appropriate in the circumstances to give the notice.</txt><note guid="_87eb02c8-4e8c-426f-bed9-577ad171e29d" id="sec.246-ssec.3-note" type="example"><heading guid="_bd9c6c1c-c6be-4dbe-9add-13a27899229f" id="sec.246-ssec.3-note-he">Example—</heading><block><txt break.before="1">The chief executive might not give a show cause notice if the chief executive considers urgent action is necessary to address a danger to public health or safety or giving the notice would be likely to adversely affect the effectiveness of the compliance notice.</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f2fc75fa-c27d-453b-bad4-5503f1569ad3" id="sec.247" provision.type="other" spent.amends="0"><no>247</no><heading guid="_d76296a6-3e13-44ad-98db-4246746d3e6d" id="sec.247-he">General requirements of show cause notice</heading><subclause affected.by.uncommenced="0" guid="_38ceda15-e97c-4112-8982-1d6a9672763e" id="sec.247-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A show cause notice must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a18718e1-89d2-4e4a-9b8d-5202bd56d302" id="sec.247-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in writing; and</txt></block></li><li guid="_84ff7934-5bb1-4a83-902b-a3d75c22c791" id="sec.247-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">outline the facts and circumstances forming the basis for the chief executive’s belief that a compliance notice should be given to the person; and</txt></block></li><li guid="_772285b2-9aca-4e9e-89f8-8a58347560c0" id="sec.247-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">state that submissions may be made about the show cause notice; and</txt></block></li><li guid="_371f7d40-48fb-4aac-b4b6-f5c38ee99d6a" id="sec.247-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">state how the submissions may be made; and</txt></block></li><li guid="_677734f4-dc5b-47ba-9dc9-640474e0b441" id="sec.247-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">state where the submissions may be made or sent; and</txt></block></li><li guid="_3d1c734e-7210-4ae5-8186-deb96864c7d1" id="sec.247-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">state a period within which the submissions must be made.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5ce25f45-ef23-4752-ba46-4deddd589745" id="sec.247-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The period stated in the notice must end at least 14 business days after the notice is given.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_9bd21018-6d0b-4e2a-9597-2773b5802b92" id="ch.11-pt.3"><no>Part 3</no><heading guid="_fbf8e34b-a33a-4137-8494-4f6dd71308e8" id="ch.11-pt.3-he">Compliance notices</heading><clause affected.by.uncommenced="0" guid="_5569ad89-ef45-48f4-b562-b3a4aea9387b" id="sec.248" provision.type="other" spent.amends="0"><no>248</no><heading guid="_e0f67448-f25c-4f99-8702-bb3ca125c597" id="sec.248-he">Giving compliance notice</heading><subclause affected.by.uncommenced="0" guid="_cf1943c9-2b4b-4595-b11e-136c9f63dcf6" id="sec.248-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the chief executive reasonably believes a person has contravened, or is contravening, a prescribed provision, the chief executive may give a notice (a <defterm guid="_81dfc403-025a-46fd-a1b9-a3021b4b0d3a" id="sec.248-def.compliancenotice" type="definition">compliance notice</defterm>) to the person requiring the person to do either or both of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_56660062-09ca-4ab4-9f57-bd057b0da5ee" id="sec.248-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to refrain from contravening the prescribed provision;</txt></block></li><li guid="_7e948bdf-3182-410f-bb67-9ef3014e694e" id="sec.248-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to remedy the contravention in the way stated in the notice.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_bc718ab5-fcb0-419c-8e45-45d990a0156c" id="sec.248-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The compliance notice must include or be accompanied by an information notice for the decision to give the person a compliance notice.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f5445f6f-3845-4ce3-993a-7f85f065cf9f" id="sec.249" provision.type="other" spent.amends="0"><no>249</no><heading guid="_9d661cdb-70e9-43b0-ad42-988e8368fa2c" id="sec.249-he">Restriction on giving compliance notice</heading><subclause affected.by.uncommenced="0" guid="_9d3d928e-57c6-414c-8c47-427423dbbc8e" id="sec.249-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the chief executive gives a person a show cause notice about a contravention of a prescribed provision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c4fdd3f3-9cb3-49c9-8245-2c5a89b97f54" id="sec.249-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may give the person a compliance notice about the contravention only if the chief executive—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_08fe45e3-f14c-4661-9c7f-44c1c07b46e8" id="sec.249-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">has considered all submissions made by the person about the show cause notice within the period stated in that notice; and</txt></block></li><li guid="_0313fbd2-65e1-4bed-96fe-ad10e9a65459" id="sec.249-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">still believes it is appropriate to give the compliance notice.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_59e260fc-78a0-4410-aebb-f1f99c7591f2" id="sec.249-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0"><intref check="valid" refid="sec.249-ssec.4" target.guid="_fc8ec319-2e36-4958-91d7-afbb76e52bef">Subsection (4)</intref> applies if the contravention of a prescribed provision is a contravention of <intref check="valid" refid="sec.57" target.guid="_bd3e7a2f-7827-447c-836a-41ca94f9cf4f">section 57</intref><intref check="valid" refid="sec.57-ssec.2" target.guid="_4ec501ec-697e-48dd-8f3c-9d9d0707614d">(2)</intref> or <intref check="valid" refid="sec.57-ssec.3" target.guid="_f9eb39a1-4e79-49fb-8f83-db64b18b8a60">(3)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fc8ec319-2e36-4958-91d7-afbb76e52bef" id="sec.249-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive may give the person a compliance notice about the contravention only if the chief executive is satisfied that the waste disposal site where the weighbridge is required to be installed is not planned to be closed within 1 year after the requirement in <intref check="valid" refid="sec.57" target.guid="_bd3e7a2f-7827-447c-836a-41ca94f9cf4f">section 57</intref><intref check="valid" refid="sec.57-ssec.2" target.guid="_4ec501ec-697e-48dd-8f3c-9d9d0707614d">(2)</intref> or <intref check="valid" refid="sec.57-ssec.3" target.guid="_f9eb39a1-4e79-49fb-8f83-db64b18b8a60">(3)</intref> started to apply to the operator of the site.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_680c30c7-abd7-42fb-82b8-aac9208ebea8" id="sec.250" provision.type="other" spent.amends="0"><no>250</no><heading guid="_3390773e-7874-4714-beb4-452b16421280" id="sec.250-he">General requirements of compliance notices</heading><subclause affected.by.uncommenced="0" guid="_0bbb6bb9-4821-4f65-9966-7499ab85a9da" id="sec.250-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A compliance notice must state the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ef7ed0f4-4fe0-4a81-9440-d0b18f623178" id="sec.250-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that the chief executive believes the person has contravened or is contravening a prescribed provision;</txt></block></li><li guid="_dc8d1561-d00a-45e9-b71a-e4e85b378728" id="sec.250-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the particular prescribed provision the chief executive believes has been, or is being, contravened;</txt></block></li><li guid="_7c4b04d3-e7a9-4e16-bfee-bbed7a792b33" id="sec.250-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">briefly, how it is believed the prescribed provision has been, or is being, contravened;</txt></block></li><li guid="_a7a1ba64-1cf7-4d97-973e-c7e525a679a1" id="sec.250-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">if the notice requires the person to refrain from contravening the prescribed provision—either of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5e663c3b-c188-42e6-8c88-d3243cd8f392" id="sec.250-ssec.1-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a period for which the requirement applies;</txt></block></li><li guid="_c10f83f9-44dd-4483-b551-2f4e4a866cc4" id="sec.250-ssec.1-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the notice relates to a contravention of <intref check="valid" refid="sec.107" target.guid="_73a3990f-ec42-4086-8690-6fcd166c1cb1">section 107</intref><intref check="valid" refid="sec.107-ssec.1" target.guid="_7ed3da33-3360-441c-9033-b8dff3bc9a9e">(1)</intref>, <intref check="valid" refid="sec.108" target.guid="_afdf6b20-9947-4872-b5f3-4a2e3f0b7d14">108</intref>, <intref check="valid" refid="sec.109" target.guid="_5fc9936f-86fd-43f3-ae76-8cb76bb42ccf">109</intref><intref check="valid" refid="sec.109-ssec.1" target.guid="_8358d163-5502-45f2-ac34-0acee885ad5b">(1)</intref> or <intref check="valid" refid="sec.109-ssec.2" target.guid="_7b56e555-6367-4d50-b30e-01357311af8d">(2)</intref> or <intref check="valid" refid="sec.146" target.guid="_3c254c41-b055-42e6-aa71-ad47e5a3846d">146</intref><intref check="invalid" refid="sec.146-ssec.2">(2)</intref>—that the requirement applies until further notice;</txt></block></li></list></block></li><li guid="_325679d3-6fb1-4fd6-9d79-2179396f6d08" id="sec.250-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">if the notice requires the person to remedy the contravention—the time by which the person must remedy the contravention;</txt></block></li><li guid="_d4ed9c24-8562-468d-8512-47eff5512d5e" id="sec.250-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">that it is an offence to fail to comply with the compliance notice unless the person has a reasonable excuse;</txt></block></li><li guid="_92dc2b7a-693b-4495-879e-86590e1c0d47" id="sec.250-ssec.1-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">the maximum penalty for failing to comply with the compliance notice.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1e4a41b6-3256-460e-93dd-dd34ff180ffd" id="sec.250-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The time under <intref check="valid" refid="sec.250-ssec.1" target.guid="_0bbb6bb9-4821-4f65-9966-7499ab85a9da">subsection (1)</intref><intref check="valid" refid="sec.250-ssec.1-para1.e" target.guid="_325679d3-6fb1-4fd6-9d79-2179396f6d08">(e)</intref> must be reasonable having regard to the action required to remedy the contravention.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_10400477-5497-4ff8-9953-7c8fc04c2ffa" id="sec.250-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The notice may also state the reasonable steps the chief executive considers necessary to remedy the contravention, or avoid further contravention, of the prescribed provision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ae2a4ed9-f3db-4997-ab53-aaf0b6ff8cbd" id="sec.250-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the compliance notice requires the person to do more than 1 thing, it may state different periods within which the things are required to be done.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b010bccb-fa7b-4317-b9c2-c1cc3f02d908" id="sec.251" provision.type="other" spent.amends="0"><no>251</no><heading guid="_3d6c5323-67db-442b-a73d-15b62410c316" id="sec.251-he">Person must comply with notice</heading><block><txt break.before="1">A person who is given a compliance notice must comply with the notice unless the person has a reasonable excuse.</txt></block><penalty guid="_fea9b768-093c-409d-b8ce-13fcdff77772" id="sec.251-pen"><block><txt break.before="1">Maximum penalty—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_917ab435-e717-4e8a-be15-3cc2440481c1" id="sec.251-pen-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the compliance notice relates to a contravention of <intref check="valid" refid="sec.107" target.guid="_73a3990f-ec42-4086-8690-6fcd166c1cb1">section 107</intref><intref check="valid" refid="sec.107-ssec.1" target.guid="_7ed3da33-3360-441c-9033-b8dff3bc9a9e">(1)</intref>, <intref check="valid" refid="sec.108" target.guid="_afdf6b20-9947-4872-b5f3-4a2e3f0b7d14">108</intref>, or 109(1) or (2)—40 penalty units; or</txt></block></li><li guid="_4b9eb77c-7c74-4bff-9157-ed30d21eaeb0" id="sec.251-pen-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the compliance notice relates to a contravention of <intref check="valid" refid="sec.58" target.guid="_389f50f8-6a50-4fc6-82b5-03dc71fa4534">section 58</intref><intref check="valid" refid="sec.58-ssec.2" target.guid="_1090ac38-cafb-430b-bf43-f045d94af667">(2)</intref> or <intref check="valid" refid="sec.58-ssec.3" target.guid="_0bd9ba12-b632-4099-83bf-7f1593ebba73">(3)</intref>—200 penalty units; or</txt></block></li><li guid="_4f1aea68-fd0a-4b47-a1b0-549a77c5b891" id="sec.251-pen-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">otherwise—300 penalty units.</txt></block></li></list></block></penalty></clause></part></chapter><chapter affected.by.uncommenced="0" guid="_f4cc8e77-df20-4f6f-ab16-3f7eadde1ca1" id="ch.12"><no>Chapter 12</no><heading guid="_27073f65-2c1f-4e13-b7b2-27d34c6b6925" id="ch.12-he">Waste audits</heading><part affected.by.uncommenced="0" guid="_c6db10e6-720d-4615-b46c-c50e70543011" id="ch.12-pt.1"><no>Part 1</no><heading guid="_609381c0-ed5d-4322-8145-86c378775e59" id="ch.12-pt.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_186b91e7-fb13-4dbf-b2a3-bc85a254cf3f" id="sec.252" provision.type="other" spent.amends="0"><no>252</no><heading guid="_b82a11a1-ba9f-498f-b41d-a40437e58c38" id="sec.252-he">Definitions for ch 12</heading><block><txt break.before="1">In this chapter—</txt><deflist><definition affected.by.uncommenced="0" guid="_a85a7b62-b80b-49f2-a151-f23907e99b82" id="sec.252-def.recipient_"><txt break.before="1"><defterm guid="_9be49c2b-b320-4724-b596-5cf0e40e5b1a" id="sec.252-def.recipient" type="definition">recipient</defterm> see <intref check="valid" refid="sec.253" target.guid="_6797fa0e-a2c4-4bb5-b2f2-ff8946650ac4">section 253</intref><intref check="valid" refid="sec.253-ssec.1" target.guid="_44634a53-d2b4-4075-be64-2860c10874b6">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_eb067906-9887-4ca2-93e2-ae25e0e67653" id="sec.252-def.wasteaudit_"><txt break.before="1"><defterm guid="_1abcf9c1-6088-4238-958b-b5ac34838e93" id="sec.252-def.wasteaudit" type="definition">waste audit</defterm> see <intref check="valid" refid="sec.253" target.guid="_6797fa0e-a2c4-4bb5-b2f2-ff8946650ac4">section 253</intref><intref check="valid" refid="sec.253-ssec.1" target.guid="_44634a53-d2b4-4075-be64-2860c10874b6">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_2e5c3152-0403-4882-badd-86fdbc059308" id="sec.252-def.wastereport_"><txt break.before="1"><defterm guid="_66bbeede-3a6f-41c5-ac32-e801bc4e11e7" id="sec.252-def.wastereport" type="definition">waste report</defterm> see <intref check="valid" refid="sec.253" target.guid="_6797fa0e-a2c4-4bb5-b2f2-ff8946650ac4">section 253</intref><intref check="valid" refid="sec.253-ssec.1" target.guid="_44634a53-d2b4-4075-be64-2860c10874b6">(1)</intref>.</txt></definition></deflist></block></clause></part><part affected.by.uncommenced="0" guid="_ba98f126-ac08-476f-aa81-b901f894ecdc" id="ch.12-pt.2"><no>Part 2</no><heading guid="_9b591f32-fc8b-49f7-a4ef-691613a183b9" id="ch.12-pt.2-he">Chief executive may require conduct of waste audits</heading><clause affected.by.uncommenced="0" guid="_6797fa0e-a2c4-4bb5-b2f2-ff8946650ac4" id="sec.253" provision.type="other" spent.amends="0"><no>253</no><heading guid="_56fdcfab-1f3a-4a5c-a160-86e33450e894" id="sec.253-he">When waste audit required</heading><subclause affected.by.uncommenced="0" guid="_44634a53-d2b4-4075-be64-2860c10874b6" id="sec.253-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the chief executive reasonably suspects that a person is contravening or has contravened a prescribed provision, the chief executive may give the person (the <defterm guid="_8895618d-9fc0-4036-9c06-edf57437bd47" id="sec.253-def.recipient" type="definition">recipient</defterm>) a notice requiring the person to commission an audit of the matter (a <defterm guid="_7a058a5d-6e74-4864-8e34-b031776cf99d" id="sec.253-def.wasteaudit" type="definition">waste audit</defterm>), and to give a report (a <defterm guid="_bffa01cb-572d-4e04-a389-b6c8627d2f95" id="sec.253-def.wastereport" type="definition">waste report</defterm>) on the audit to the chief executive, under this chapter.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1a96334a-345b-40d1-99a4-18e91ab29d95" id="sec.253-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_230fc0a9-5085-4595-9cf2-e738f833cfe0" id="sec.253-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">state the grounds on which the requirement is made; and</txt></block></li><li guid="_c09be744-d639-448f-8a14-f8f54f3f47b8" id="sec.253-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">outline the facts and circumstances forming the basis for the grounds; and</txt></block></li><li guid="_bcc8fdc6-9c93-4029-89da-4d82ac0f341f" id="sec.253-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">state the scope of the waste audit; and</txt></block></li><li guid="_faa4892a-8b67-4083-9263-9c45220a9964" id="sec.253-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">state the day (at least a reasonable period after the notice is given) by which the recipient must give the waste report to the chief executive.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_4cb3597c-64f9-4826-bb79-ccf6a318cc2b" id="sec.253-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The notice must include or be accompanied by an information notice for the decision to give the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e70b6bf9-28be-442f-89cf-2f2992a0a6a5" id="sec.253-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_0721e248-8820-4a88-a37b-c37ab3bfb144" id="sec.253-ssec.4-def.prescribedprovision_"><txt break.before="1"><defterm guid="_1155b178-67f9-43d7-ac48-671106c715eb" id="sec.253-ssec.4-def.prescribedprovision" type="definition">prescribed provision</defterm> means <intref check="valid" refid="sec.56" target.guid="_56f0993b-32fe-42f6-9d56-3991b3827be2">section 56</intref><intref check="valid" refid="sec.56-ssec.2" target.guid="_6eb7bd0d-3090-4517-9c93-ed8f5b72953c">(2)</intref>, <intref check="valid" refid="sec.57" target.guid="_bd3e7a2f-7827-447c-836a-41ca94f9cf4f">57</intref><intref check="valid" refid="sec.57-ssec.2" target.guid="_4ec501ec-697e-48dd-8f3c-9d9d0707614d">(2)</intref> or <intref check="valid" refid="sec.57-ssec.3" target.guid="_f9eb39a1-4e79-49fb-8f83-db64b18b8a60">(3)</intref>, <intref check="valid" refid="sec.58" target.guid="_389f50f8-6a50-4fc6-82b5-03dc71fa4534">58</intref><intref check="valid" refid="sec.58-ssec.2" target.guid="_1090ac38-cafb-430b-bf43-f045d94af667">(2)</intref>, <intref check="valid" refid="sec.60" target.guid="_6b758c45-59e4-4c54-a187-7dd0e64f5df2">60</intref><intref check="valid" refid="sec.60-ssec.2" target.guid="_7c06ce4a-c72c-46fe-b2c8-e80c721baa68">(2)</intref>, <intref check="valid" refid="sec.60-ssec.4" target.guid="_d1d3a074-6d0e-465a-93ce-2ccf0ebc7737">(4)</intref> or <intref check="valid" refid="sec.60-ssec.6" target.guid="_5666ac22-639c-4ed9-8416-49ba2e2a85c0">(6)</intref>, <intref check="valid" refid="sec.61" target.guid="_70b550db-f7c0-4d9e-9f5c-43a6756d09b9">61</intref><intref check="valid" refid="sec.61-ssec.2" target.guid="_72ada995-52a6-453a-b663-5f6459e43d3c">(2)</intref> or <intref check="valid" refid="sec.61-ssec.3" target.guid="_28737b71-b41a-4151-960a-4724cecac5f8">(3)</intref>, <intref check="valid" refid="sec.67" target.guid="_1d60a32d-8f3f-4c74-b128-ed801dc77562">67</intref><intref check="valid" refid="sec.67-ssec.1" target.guid="_f9bd9494-6402-47bd-8566-8b7b1ba77005">(1)</intref>, <intref check="valid" refid="sec.68" target.guid="_504b9a69-4416-406c-9fcb-ee6a8ce7fb0b">68</intref><intref check="valid" refid="sec.68-ssec.2" target.guid="_5348304b-a43d-4554-9b24-87b4bd331114">(2)</intref>, <intref check="valid" refid="sec.69" target.guid="_8574fffe-fc1f-4b78-a4b5-cd19e953febb">69</intref><intref check="valid" refid="sec.69-ssec.2" target.guid="_906cab4d-a709-49ac-9064-a334ff9f1133">(2)</intref>, <intref check="valid" refid="sec.72" target.guid="_d30e771f-e48c-4292-86ed-c1b4fb7d03e1">72</intref><intref check="valid" refid="sec.72-ssec.1" target.guid="_ba53cadb-d2d7-444e-889c-bf6ae38c6fe8">(1)</intref>, <intref check="valid" refid="sec.72A" target.guid="_77f1a5af-3ef5-4da6-abff-20dcb185001c">72A</intref>, <intref check="valid" refid="sec.72X" target.guid="_2f977b6e-f533-45f7-a7e3-a5d9b1bc5b14">72X</intref>, <intref check="valid" refid="sec.72Y" target.guid="_c86b8c3f-a9f0-499e-8a55-07c0716cc048">72Y</intref><intref check="valid" refid="sec.72Y-ssec.2" target.guid="_534deb3c-cfea-418e-b7e6-b7d0c4a8016b">(2)</intref>, <intref check="valid" refid="sec.72Z" target.guid="_7afd9761-9b3c-4b65-b873-e42fd9374ab0">72Z</intref><intref check="valid" refid="sec.72Z-ssec.2" target.guid="_ad6014bb-a0f8-48b1-bd11-0e4d5e38e880">(2)</intref>, <intref check="valid" refid="sec.73A" target.guid="_2f0595c2-9cf6-40db-ae33-ed59d3b55428">73A</intref><intref check="valid" refid="sec.73A-ssec.2" target.guid="_0b6d7fc5-2edc-4b80-a947-0107f1b0fccc">(2)</intref>, <intref check="valid" refid="sec.73B" target.guid="_84b492c5-ffa9-44e2-b8b6-ccd99eea203c">73B</intref><intref check="valid" refid="sec.73B-ssec.1" target.guid="_634808a0-6a29-4c2d-a833-b4bbe7f86d2f">(1)</intref> or <intref check="valid" refid="sec.73B-ssec.2" target.guid="_07321296-580a-42cb-9c80-4d1d028e2e35">(2)</intref>, <intref check="valid" refid="sec.101" target.guid="_2235935f-e276-4573-ac77-6388955d7507">101</intref>, <intref check="valid" refid="sec.104" target.guid="_428f4a48-281f-4088-8124-b981fb6fd86a">104</intref>, <intref check="valid" refid="sec.301E" target.guid="_f6c74cfc-b561-42d8-bb9d-691f686cb0b8">301E</intref> or <intref check="valid" refid="sec.301F" target.guid="_77e2f247-aab4-4f3d-b2e0-558669574f86">301F</intref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3897f700-9774-4066-9e99-bd65e339ce29" id="sec.254" provision.type="other" spent.amends="0"><no>254</no><heading guid="_57a64d3b-98c4-4a0c-b4b4-de4d6fdba296" id="sec.254-he">Recipient must comply with notice</heading><block><txt break.before="1">The recipient must comply with the notice unless the recipient has a reasonable excuse.</txt></block><penalty guid="_eb2f9ca1-0882-41b3-9fd9-c5319a5f47ca" id="sec.254-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></clause></part><part affected.by.uncommenced="0" guid="_f06c60df-89e3-47c8-8510-dfe252a0b9af" id="ch.12-pt.3"><no>Part 3</no><heading guid="_4e529508-228d-429b-b616-623a84ef1c3e" id="ch.12-pt.3-he">Other provisions</heading><clause affected.by.uncommenced="0" guid="_61a5ab88-700e-486e-a42a-398f77d74722" id="sec.255" provision.type="other" spent.amends="0"><no>255</no><heading guid="_9be865e0-361e-4951-8439-3db9aa5d3b26" id="sec.255-he">Who may conduct waste audit</heading><subclause affected.by.uncommenced="0" guid="_49f0563a-7c04-4faa-8ffe-3f84b0ee0ab9" id="sec.255-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The recipient must commission a suitably qualified person to conduct the waste audit.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bb7a9fd2-6398-483c-88b9-e249908eb34a" id="sec.255-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The person commissioned by the recipient must be independent of the recipient and of the premises to which the waste audit relates.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2082c693-5c7f-43df-bae6-508d5376ba12" id="sec.255-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_12d060ab-43f3-427c-a15f-5a66525d80a8" id="sec.255-ssec.3-def.suitablyqualifiedperson_"><txt break.before="1"><defterm guid="_347b312c-11be-406c-8cc1-0b62d067f3a9" id="sec.255-ssec.3-def.suitablyqualifiedperson" type="definition">suitably qualified person</defterm>, in relation to the conduct of a waste audit, means a person who has the qualifications and experience appropriate for conducting the audit.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_06a6e0ac-91f5-4634-b138-904482f88d63" id="sec.256" provision.type="other" spent.amends="0"><no>256</no><heading guid="_b13321a6-2b20-48b8-be96-6f7f18f76d8d" id="sec.256-he">Declarations to accompany waste report</heading><subclause affected.by.uncommenced="0" guid="_338bfd4a-a30a-4ede-9019-54038a54cc48" id="sec.256-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A waste report given to the chief executive must be accompanied by a statutory declaration by the recipient and the person who carried out the waste audit.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9eaed059-906b-4373-b38f-b45294e3d03c" id="sec.256-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The recipient’s declaration must be made—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ab556882-3b92-40d4-a4d4-6f0b0dbe70e9" id="sec.256-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the recipient is an individual—by the recipient; or</txt></block></li><li guid="_39e04bef-d7bb-42ec-bab2-2993863af7b1" id="sec.256-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the recipient is a corporation—by an executive officer of the corporation acting on the corporation’s behalf.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6af2d527-e186-40f2-9de3-222e0cd3477c" id="sec.256-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The recipient’s declaration must state that the recipient—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_baeacbd7-8f52-4546-9aa7-0f58438c8ad8" id="sec.256-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">has not knowingly given any false or misleading information to the person who carried out the waste audit; and</txt></block></li><li guid="_3ca46fde-d211-48ca-9e8a-6536f90d9c0e" id="sec.256-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">has given all relevant information to the person who carried out the waste audit.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_aad8b0d0-600f-463f-be49-17768d921008" id="sec.256-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A declaration by the person who carried out the waste audit must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fd769326-d8e6-4ec4-a4de-4edb7e128811" id="sec.256-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">state his or her qualifications and experience relevant to the audit; and</txt></block></li><li guid="_59476c10-1809-4845-89d1-3fdbf3f149a9" id="sec.256-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state that he or she has not knowingly included any false, misleading or incomplete information in the report; and</txt></block></li><li guid="_21a66b0f-c9f9-4ed7-b85c-179423748df8" id="sec.256-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">state that he or she has not knowingly failed to reveal any relevant information or document to the chief executive; and</txt></block></li><li guid="_f67fc53e-c2d0-498f-a497-e758a3894578" id="sec.256-ssec.4-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">certify that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ad5c3a27-04b7-4b73-a20b-e787a4caeb2f" id="sec.256-ssec.4-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the report addresses the relevant matters for the audit and is factually correct; and</txt></block></li><li guid="_4717d607-6d5a-40ba-9bc8-a232237e0864" id="sec.256-ssec.4-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the opinions expressed in it are honestly and reasonably held.</txt></block></li></list></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d3f1ed4c-9084-4bd0-9614-777a7e1fe7ac" id="sec.257" provision.type="other" spent.amends="0"><no>257</no><heading guid="_da002a93-08cb-40fa-ac41-ed37a767dc26" id="sec.257-he">Costs of waste audit and report</heading><block><txt break.before="1">The recipient must bear the costs of commissioning a waste audit and of the waste report.</txt></block></clause></part></chapter><chapter affected.by.uncommenced="0" guid="_d80656f1-c563-46c3-80f7-f6906337e80d" id="ch.12A"><no>Chapter 12A </no><heading guid="_b425639f-63b8-4873-bd84-6aab3413ae78" id="ch.12A-he">Legal proceedings</heading><clause affected.by.uncommenced="0" guid="_8a053be6-3c39-4313-85f4-dc1f8ac21009" id="sec.257A" provision.type="other" spent.amends="0"><no>257A </no><heading guid="_08444827-7e95-4a8d-9ac6-752f26739395" id="sec.257A-he">Application of chapter</heading><block><txt break.before="1">This chapter applies to a legal proceeding under this Act.</txt></block></clause><clause affected.by.uncommenced="0" guid="_5235dc9a-7f21-4cf8-b67e-f7c081b773f0" id="sec.257B" provision.type="other" spent.amends="0"><no>257B </no><heading guid="_73924fc4-cb23-45ef-bba7-f6ece4bb8577" id="sec.257B-he">Appointments and authority</heading><block><txt break.before="1">The following must be presumed unless a party to the proceeding, by reasonable notice, requires proof of it—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0976b341-d67c-4b49-b4b4-aaae3b456d2f" id="sec.257B-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the chief executive’s appointment;</txt></block></li></list><list number.type="manual" unnumbered.indent="0"><li guid="_dee5e8d4-113b-4b3d-85a7-cf11937b9e47" id="sec.257B-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an authorised person’s appointment.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_78de0210-8f0a-48bd-a785-e1944f130aad" id="sec.257C" provision.type="other" spent.amends="0"><no>257C </no><heading guid="_d12efeda-196d-4a82-9b9e-c6ad50a26ac6" id="sec.257C-he">Signatures</heading><block><txt break.before="1">A signature purporting to be the signature of the following person is evidence of the signature it purports to be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_eadd70ea-a7ca-4c06-a55f-f309736c1f96" id="sec.257C-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the chief executive;</txt></block></li></list><list number.type="manual" unnumbered.indent="0"><li guid="_6e63ba40-93d3-4e06-964f-67594a3008c0" id="sec.257C-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an authorised person.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_4a20fdb2-39ab-46be-bf1e-ae996ed6d929" id="sec.257D" provision.type="other" spent.amends="0"><no>257D </no><heading guid="_cff50a24-83c5-4d91-9819-8f2605a35adf" id="sec.257D-he">Evidentiary provisions</heading><subclause affected.by.uncommenced="0" guid="_45e84054-80e5-4234-9866-ed950780a775" id="sec.257D-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A certificate purporting to be signed by the chief executive and stating any of the following matters is evidence of the matter—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3eb81aa0-4fe2-44c1-9ef7-454cd3915d93" id="sec.257D-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">on a stated day a stated waste levy amount was payable by a stated person;</txt></block></li><li guid="_88156c20-a104-4338-8fcc-a8b9ec885531" id="sec.257D-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">on a stated day a stated person was given a stated notice or direction under this Act;</txt></block></li><li guid="_e7641afb-c7f7-4079-b1d0-4fa87f1bdc7b" id="sec.257D-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a stated amount that is or was payable under this Act by a stated person had or had not been paid by the person on a stated day;</txt></block></li><li guid="_bb4cdba4-d627-46ef-ae95-5137eccb90a7" id="sec.257D-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a stated document is a copy of a document issued, given, received or kept by the chief executive under this Act;</txt></block></li><li guid="_d557052b-22a9-4747-aafa-95edb4625b24" id="sec.257D-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">on a stated day, or during a stated period, a stated person was or was not the holder of an approval, agreement, extension or other authority given under this Act;</txt></block></li><li guid="_58ff8119-b8a8-4492-8750-6a8d7690173d" id="sec.257D-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">on a stated day, or during a stated period, a stated person was or was not the holder of an environmental approval or other authority given under the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Environmental Protection Act</name></legref>;</txt></block></li><li guid="_58c187dd-76a4-4973-81b6-d1604f05a873" id="sec.257D-ssec.1-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">an approval, agreement, extension or other authority given under this Act or an environmental approval or other authority given under the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Environmental Protection Act</name></legref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7a36c096-0e43-49fd-81cb-419ef60f81a2" id="sec.257D-ssec.1-para1.g-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">was or was not issued or given for a stated term; or</txt></block></li><li guid="_743cd5f0-913d-4265-9080-f51bd4e00406" id="sec.257D-ssec.1-para1.g-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">was or was not in force on a stated day or during a stated period; or</txt></block></li><li guid="_8cbf163d-fd32-41ca-bced-877409f74b45" id="sec.257D-ssec.1-para1.g-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">was or was not subject to a stated condition; </txt></block></li></list></block></li><li guid="_1c235ee6-5415-48b1-859e-154e8c17a248" id="sec.257D-ssec.1-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">the reasonable costs incurred by the chief executive in investigating and prosecuting an offence.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_550e15aa-669c-4d47-adac-e4571b10596e" id="sec.257D-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In a proceeding for an offence against this Act, the production by the prosecutor of a certificate purporting to be signed by an appropriately qualified person (the <defterm guid="_9519ae63-a40e-4c8d-b023-105c6d680246" id="sec.257D-def.analyst" type="definition">analyst</defterm>) and stating any of the following matters is evidence of the matter stated in the certificate—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a919b29c-55c4-4744-9892-2e129ead86e6" id="sec.257D-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the analyst received from a stated person the sample mentioned in the certificate;</txt></block></li><li guid="_8a215045-3bcb-4555-9dcf-43f66b07bebb" id="sec.257D-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the analyst analysed the sample on a stated day and at a stated place;</txt></block></li><li guid="_2b5d4456-1579-4454-865b-6959611db449" id="sec.257D-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the results of the analysis.</txt></block></li></list></block></subclause></clause></chapter><chapter affected.by.uncommenced="0" guid="_fa97f0f9-fcdc-4030-b458-1fc74d7a1986" id="ch.13"><no>Chapter 13</no><heading guid="_f95a8a94-2c5a-460d-adad-d7841c4e5d6f" id="ch.13-he">Court orders</heading><clause affected.by.uncommenced="0" guid="_e09ac7f1-8c56-40fe-8f0c-28eec4acfdb4" id="sec.258" provision.type="other" spent.amends="0"><no>258</no><heading guid="_66f245f8-9b76-45cb-bb66-a7e30d505cfc" id="sec.258-he">Court may make particular orders</heading><subclause affected.by.uncommenced="0" guid="_a7e4d6c3-30cc-4db7-9435-a8fb10ae2026" id="sec.258-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a court convicts a person of a prescribed offence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1911601f-60eb-4a96-a584-95da846ab8c8" id="sec.258-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The court may, on application by the prosecution, make either or both of the following orders against the defendant—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_30c36da9-9030-47e9-b684-71054a1755b6" id="sec.258-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a rehabilitation or restoration order;</txt></block></li><li guid="_2a0574fa-0083-41d0-9faa-0b2739b5fb19" id="sec.258-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a monetary benefit order.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ed7594b0-c920-4db3-adbb-c8e4ceeb81f4" id="sec.258-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0"><intref check="valid" refid="sec.258-ssec.4" target.guid="_10e7a998-1708-4eaa-982f-ed0fb36bbedf">Subsection (4)</intref> applies if the court finds that, because of the act or omission constituting the offence, another person has—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cf054aee-6ddc-4895-8909-212e7733ed69" id="sec.258-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">suffered a reduction in the value of, or damage to, property; or</txt></block></li><li guid="_0216cbfd-d78e-4a45-b2aa-c3c54eee03e2" id="sec.258-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">incurred costs or expenses in replacing or repairing property, or in preventing or minimising, or attempting to prevent or minimise, a reduction or damage mentioned in <intref check="valid" refid="sec.258-ssec.3-para1.a" target.guid="_cf054aee-6ddc-4895-8909-212e7733ed69">paragraph (a)</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_10e7a998-1708-4eaa-982f-ed0fb36bbedf" id="sec.258-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In addition to any order the court makes under <intref check="valid" refid="sec.258-ssec.2" target.guid="_1911601f-60eb-4a96-a584-95da846ab8c8">subsection (2)</intref>, the court may, on application by the prosecution, order the defendant to pay to the other person an amount of compensation the court considers appropriate for the reduction or damage suffered, or costs or expenses incurred.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_dbe4818f-838a-478d-9026-e585aa329526" id="sec.258-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">An order under this section must state the period within which the order must be complied with.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_732b3df0-0e99-4872-835e-695761a0a989" id="sec.258-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">This section does not limit the court’s powers under the <legref check="valid" jurisd="QLD" target.doc.id="act-1992-048" target.version.series="6bcfc277-3e30-47e3-a34f-9379b3cd284a" type="act"><name emphasis="yes">Penalties and Sentences Act 1992</name></legref> or any other law.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9f3f6850-7534-4888-b718-00cc0673b042" id="sec.258-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_05d36f31-13fd-41e6-b2e3-d82441884b85" id="sec.258-ssec.7-def.monetarybenefitorder_"><txt break.before="1"><defterm guid="_cff98f64-6e6d-4d2f-b0fe-6587fc09821d" id="sec.258-ssec.7-def.monetarybenefitorder" type="definition">monetary benefit order</defterm> means an order requiring the person against whom it is made to pay an amount to the chief executive representing any financial or other benefit the person has received because of the act or omission constituting the offence in relation to which the order is made.</txt></definition><definition affected.by.uncommenced="0" guid="_f60f58ee-04d5-4ceb-9e82-b6d285ed10c2" id="sec.258-ssec.7-def.prescribedoffence_"><txt break.before="1"><defterm guid="_e226e1f5-ece9-4658-8d13-4d7d5d9843e3" id="sec.258-ssec.7-def.prescribedoffence" type="definition">prescribed offence</defterm> means an offence against <intref check="valid" refid="sec.53" target.guid="_f86b8d4b-010d-4c7b-83cf-00c6cb4be065">section 53</intref><intref check="valid" refid="sec.53-ssec.2" target.guid="_5a8388b6-2afa-49de-b2a2-391f931857d4">(2)</intref>, <intref check="valid" refid="sec.57" target.guid="_bd3e7a2f-7827-447c-836a-41ca94f9cf4f">57</intref><intref check="valid" refid="sec.57-ssec.2" target.guid="_4ec501ec-697e-48dd-8f3c-9d9d0707614d">(2)</intref> or <intref check="valid" refid="sec.57-ssec.3" target.guid="_f9eb39a1-4e79-49fb-8f83-db64b18b8a60">(3)</intref>, <intref check="valid" refid="sec.58" target.guid="_389f50f8-6a50-4fc6-82b5-03dc71fa4534">58</intref><intref check="valid" refid="sec.58-ssec.2" target.guid="_1090ac38-cafb-430b-bf43-f045d94af667">(2)</intref>, <intref check="valid" refid="sec.58-ssec.3" target.guid="_0bd9ba12-b632-4099-83bf-7f1593ebba73">(3)</intref> or <intref check="valid" refid="sec.58-ssec.4" target.guid="_d8459da6-ad43-4b64-be72-e4a51b28a382">(4)</intref>, <intref check="valid" refid="sec.60" target.guid="_6b758c45-59e4-4c54-a187-7dd0e64f5df2">60</intref><intref check="valid" refid="sec.60-ssec.2" target.guid="_7c06ce4a-c72c-46fe-b2c8-e80c721baa68">(2)</intref>, <intref check="valid" refid="sec.60-ssec.4" target.guid="_d1d3a074-6d0e-465a-93ce-2ccf0ebc7737">(4)</intref> or <intref check="valid" refid="sec.60-ssec.6" target.guid="_5666ac22-639c-4ed9-8416-49ba2e2a85c0">(6)</intref>, <intref check="valid" refid="sec.61" target.guid="_70b550db-f7c0-4d9e-9f5c-43a6756d09b9">61</intref><intref check="valid" refid="sec.61-ssec.2" target.guid="_72ada995-52a6-453a-b663-5f6459e43d3c">(2)</intref> or <intref check="valid" refid="sec.61-ssec.3" target.guid="_28737b71-b41a-4151-960a-4724cecac5f8">(3)</intref>, <intref check="valid" refid="sec.69" target.guid="_8574fffe-fc1f-4b78-a4b5-cd19e953febb">69</intref><intref check="valid" refid="sec.69-ssec.2" target.guid="_906cab4d-a709-49ac-9064-a334ff9f1133">(2)</intref>, <intref check="valid" refid="sec.72" target.guid="_d30e771f-e48c-4292-86ed-c1b4fb7d03e1">72</intref><intref check="valid" refid="sec.72-ssec.1" target.guid="_ba53cadb-d2d7-444e-889c-bf6ae38c6fe8">(1)</intref>, <intref check="valid" refid="sec.73A" target.guid="_2f0595c2-9cf6-40db-ae33-ed59d3b55428">73A</intref><intref check="valid" refid="sec.73A-ssec.2" target.guid="_0b6d7fc5-2edc-4b80-a947-0107f1b0fccc">(2)</intref>, <intref check="valid" refid="sec.73B" target.guid="_84b492c5-ffa9-44e2-b8b6-ccd99eea203c">73B</intref><intref check="valid" refid="sec.73B-ssec.1" target.guid="_634808a0-6a29-4c2d-a833-b4bbe7f86d2f">(1)</intref> or <intref check="valid" refid="sec.73B-ssec.2" target.guid="_07321296-580a-42cb-9c80-4d1d028e2e35">(2)</intref>, <intref check="valid" refid="sec.101" target.guid="_2235935f-e276-4573-ac77-6388955d7507">101</intref>, <intref check="valid" refid="sec.104" target.guid="_428f4a48-281f-4088-8124-b981fb6fd86a">104</intref><intref check="valid" refid="sec.104-ssec.1" target.guid="_d4b52884-8745-4059-bece-7159bd221cc0">(1)</intref>, <intref check="valid" refid="sec.158" target.guid="_127325aa-09ca-453b-90f0-03554827f07c">158</intref><intref check="valid" refid="sec.158-ssec.1" target.guid="_04b24a97-d5e7-4d55-a995-a3ff3596ba87">(1)</intref> or <intref check="valid" refid="sec.158-ssec.2" target.guid="_909941b8-6640-44cb-91ec-e8747348e2be">(2)</intref>, <intref check="valid" refid="sec.173K" target.guid="_c36de416-fa8f-4e20-bd01-066635122f5b">173K</intref><intref check="valid" refid="sec.173K-ssec.2" target.guid="_dbd5cf41-db62-44d8-8caa-22104b1ad697">(2)</intref>, <intref check="valid" refid="sec.264" target.guid="_de5db943-fe3b-4881-9799-4a4a35280c95">264</intref><intref check="valid" refid="sec.264-ssec.1" target.guid="_e607c617-cc74-476e-92cd-24819d047a95">(1)</intref> or <intref check="valid" refid="sec.264-ssec.2" target.guid="_29056cb3-b7a9-4f27-8b72-d4fb9982c94a">(2)</intref>, <intref check="valid" refid="sec.265" target.guid="_592f6a11-0e0e-46f5-b681-4d0faf515451">265</intref><intref check="valid" refid="sec.265-ssec.1" target.guid="_9189485e-40bc-439c-8632-aea2864cb898">(1)</intref>, <intref check="valid" refid="sec.265A" target.guid="_570f277e-170a-456c-ab25-35ea1c3f6917">265A</intref><intref check="valid" refid="sec.265A-ssec.2" target.guid="_4ea6948b-35f5-4b26-ab00-b69c01ccb12f">(2)</intref>, <intref check="valid" refid="sec.296" target.guid="_2970feac-036a-4a80-a995-8db03dc96951">296</intref><intref check="valid" refid="sec.296-ssec.1" target.guid="_da4d7569-5357-43b8-81c5-a51525759cdd">(1)</intref> or <intref check="valid" refid="sec.297" target.guid="_5a1287c5-825b-4b8f-9c1a-a5b525df7532">297</intref><intref check="valid" refid="sec.297-ssec.1" target.guid="_9e14f4a7-817f-48e0-92cd-173cdb03bd3f">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_044e09f3-8866-484a-9d45-103826102cf8" id="sec.258-ssec.7-def.rehabilitationorrestorationorder_"><txt break.before="1"><defterm guid="_caaff8c4-1dfc-47c4-bee4-1f87f2d369d9" id="sec.258-ssec.7-def.rehabilitationorrestorationorder" type="definition">rehabilitation or restoration order</defterm> means an order requiring the person against whom it is made to take stated action to rehabilitate or restore the land that was adversely affected because of the act or omission constituting the offence in relation to which the order is made.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_ad37641e-57ff-4589-afa8-789c622d8ff1" id="sec.259" provision.type="other" spent.amends="0"><no>259</no><heading guid="_0394f2cb-3ee8-4574-b2f0-bf2a8340262d" id="sec.259-he">Court may order recovery of chief executive’s costs</heading><subclause affected.by.uncommenced="0" guid="_30b2a995-584e-4bd4-adf3-ef83c4d8da6b" id="sec.259-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a court convicts a person of an offence against this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_77e0169d-6925-44bd-830a-2dfcadefe529" id="sec.259-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The court may order the person to pay an amount to the chief executive representing the reasonable costs the chief executive incurred in investigating and prosecuting the offence.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_243d40e3-521a-4310-9178-f841f68d9792" id="sec.260" provision.type="other" spent.amends="0"><no>260</no><heading guid="_dd4c00c4-60f2-46a0-9bc6-12cf62cc7bf3" id="sec.260-he">Chief executive may take action and recover costs</heading><subclause affected.by.uncommenced="0" guid="_1d9d4f72-53ee-42b7-8ffe-a223a19a1341" id="sec.260-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a rehabilitation or restoration order is made against a person under <intref check="valid" refid="sec.258" target.guid="_e09ac7f1-8c56-40fe-8f0c-28eec4acfdb4">section 258</intref>, and the person fails to comply with the order within the period stated in the order.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_52a4c011-d272-4c2f-a0a0-48463999d1bc" id="sec.260-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may carry out work or take any other action reasonably necessary to fulfil the requirements of the order.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5a5db3f7-b35f-414e-981a-5eb4a4962f93" id="sec.260-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The costs reasonably incurred by the chief executive in carrying out work or taking other action under <intref check="valid" refid="sec.260-ssec.2" target.guid="_52a4c011-d272-4c2f-a0a0-48463999d1bc">subsection (2)</intref> are a debt payable by the person to the chief executive.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e23321ec-cc94-44d4-b156-b6104a851a2c" id="sec.261" provision.type="other" spent.amends="0"><no>261</no><heading guid="_7344910a-4477-4f16-ad16-65372e01ad72" id="sec.261-he">Restraint of contraventions of Act etc.</heading><subclause affected.by.uncommenced="0" guid="_b6ffed3a-5da6-4524-9b48-80f454e6cb9c" id="sec.261-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A proceeding may be brought in a Magistrate’s Court by a prescribed person for an order to remedy or restrain an offence against this Act, or a threatened or anticipated offence against this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_133c8eda-f41e-4108-ac60-fe68bfac3586" id="sec.261-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the court is satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7adeaaeb-feab-4e38-88d2-f33e0172287f" id="sec.261-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an offence against this Act has been committed (whether or not it has been prosecuted); or</txt></block></li><li guid="_6b2fbe84-97f7-4343-aa0b-0e6ba3a62472" id="sec.261-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an offence against this Act will be committed unless restrained;</txt></block></li></list></block><block><txt break.before="1">the court may make the orders it considers appropriate to remedy or restrain the offence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2aff2059-9223-4b50-9371-7ab68a358055" id="sec.261-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">An order—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6f4a883f-592b-4aa1-a5d5-665b95ef4dbc" id="sec.261-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">may direct the person against whom the order is made (the <defterm guid="_bafca39a-c70e-45d9-a424-fd6414c4432f" id="sec.261-ssec.3-def.defendant" type="definition">defendant</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_30fb9c22-21e5-4da8-a719-b90361f095d6" id="sec.261-ssec.3-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">to stop an activity that is or will be a contravention of this Act; or</txt></block></li><li guid="_cc0f45d6-0f2b-495a-96ed-90ef85ca95ef" id="sec.261-ssec.3-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">to do anything required to comply with, or to cease a contravention of, this Act; and</txt></block></li></list></block></li><li guid="_559638a6-26ae-4648-813d-17cc3e4575ad" id="sec.261-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">may be in the terms the court considers appropriate to secure compliance with this Act; and</txt></block></li><li guid="_cef29071-ab56-47ce-81e9-34c92c1932e9" id="sec.261-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">must specify the time by which the order is to be complied with; and</txt></block></li><li guid="_b989a427-2529-40b2-b336-8718558a813d" id="sec.261-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">may include an order for the defendant to pay the costs reasonably incurred by the chief executive in monitoring the defendant’s actions in relation to the offence.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b7126312-e279-4bc8-ab7a-74f146ac74ed" id="sec.261-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The court’s power to make an order to stop an activity may be exercised whether or not—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9b3be1aa-9cd6-4475-84f7-c06838da3529" id="sec.261-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">it appears to the court the defendant intends to engage, or to continue to engage, in the activity; or</txt></block></li><li guid="_4034b353-be39-4fbe-87e4-8dedf6a2b62b" id="sec.261-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the defendant has previously engaged in an activity of that kind.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_55c66c93-fe27-4f3f-b18a-7c8070204a88" id="sec.261-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The court’s power to make an order to do anything may be exercised whether or not—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_55c121d1-bafe-4664-a256-d7feaa92ae35" id="sec.261-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">it appears to the court the defendant intends to fail, or to continue to fail, to do the thing; or</txt></block></li><li guid="_fa62bb8c-e7e0-43d0-82a4-ed647ace05be" id="sec.261-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the defendant has previously failed to do a thing of that kind.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_364555de-f418-4f53-b56f-b19a8e8d92e3" id="sec.261-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">Without limiting the powers of the court, the court may make an order—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_44d856d7-5b7f-4183-9018-1deda606bf41" id="sec.261-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">restraining the use of plant or equipment or a place; or</txt></block></li><li guid="_6791d1df-5268-4404-bdd9-554bd75f0ea1" id="sec.261-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">requiring the demolition or removal of plant or equipment, a structure or another thing; or</txt></block></li><li guid="_11d2003e-9345-4e50-9041-5c145eeb60df" id="sec.261-ssec.6-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">requiring the rehabilitation or restoration of land.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7d77185a-bf90-40ff-b610-0524cde38cd5" id="sec.261-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">The court’s power under this section is in addition to its other powers.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b1303562-2a88-4428-9b5a-b461dd63d7cb" id="sec.261-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">A person must not contravene an order made under this section.</txt></block><penalty guid="_b2c44890-f8fb-41aa-bcf2-6a3e2b1ae4cd" id="sec.261-ssec.8-pen"><block><txt break.before="1">Maximum penalty—3,000 penalty units or 2 years imprisonment.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_6f556845-7e46-42e8-b541-9ae2081a2b8e" id="sec.261-ssec.9" provision.type="other"><no>(9)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_0d859415-1213-4b75-823b-cdc3d02f9b15" id="sec.261-ssec.9-def.prescribedperson_"><txt break.before="1"><defterm guid="_4a0d4d8a-5b79-485d-a684-573e5635c960" id="sec.261-ssec.9-def.prescribedperson" type="definition">prescribed person</defterm>, in relation to a proceeding, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_174cd8aa-62c9-49fa-b3fc-106bc4687ba9" id="sec.261-ssec.9-def.prescribedperson-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the Minister; or</txt></block></li><li guid="_82d0fcd9-6796-447e-9e3c-a64225148898" id="sec.261-ssec.9-def.prescribedperson-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the chief executive; or</txt></block></li><li guid="_df5fda90-fead-4143-8352-c958b575c2a0" id="sec.261-ssec.9-def.prescribedperson-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">someone whose interests are affected by the subject matter of the proceeding.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_52a22410-8f85-4904-8002-b34a14a24784" id="sec.262" provision.type="other" spent.amends="0"><no>262</no><heading guid="_4241d614-6276-435f-8891-21f226f4a95a" id="sec.262-he">Power of court to make order pending determination of proceeding</heading><subclause affected.by.uncommenced="0" guid="_4183ecf2-0b26-4e95-aea2-37d8ac0250a9" id="sec.262-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a proceeding has been brought by a person in a Magistrate’s Court under <intref check="valid" refid="sec.261" target.guid="_e23321ec-cc94-44d4-b156-b6104a851a2c">section 261</intref> and the court has not decided the proceeding.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3fd8edd2-1c7e-4ec9-a81a-732fd7f28ac3" id="sec.262-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On the person’s application, the court may make an order of a kind mentioned in <intref check="valid" refid="sec.261" target.guid="_e23321ec-cc94-44d4-b156-b6104a851a2c">section 261</intref> pending its deciding the proceeding if it is satisfied it would be proper to make the order.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d1c6e1d7-be09-496c-927d-84e64b1c80fc" id="sec.262-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The court’s power to make an order to stop an activity may be exercised whether or not—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_52d08198-6377-4142-a5d8-701e7b73ad6f" id="sec.262-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">it appears to the court the person against whom the order is made intends to engage, or to continue to engage, in the activity; or</txt></block></li><li guid="_1f661871-02a9-4d8f-bdb3-bb1e680df5a1" id="sec.262-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the person has previously engaged in an activity of that kind.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9e5f6af9-3048-4034-82f5-2d65c88142fc" id="sec.262-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The court’s power to make an order to do anything may be exercised whether or not—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d831cb8a-3a1f-4b6a-96ae-2843d662593e" id="sec.262-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">it appears to the court the person against whom the order is made intends to fail, or to continue to fail, to do the thing; or</txt></block></li><li guid="_4e6623e9-1227-4394-9bc2-4909a4212afc" id="sec.262-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the person has previously failed to do a thing of that kind.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_da36adcb-09e5-421f-bddc-58d6a51c3431" id="sec.262-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The court’s power under this section is in addition to its other powers.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1b67918d-78a7-40ed-a703-f77b4b0d63db" id="sec.262-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">A person must not contravene an order made under this section.</txt></block><penalty guid="_fc03fe60-17ec-4dbe-9cd6-29a3fdb81f8a" id="sec.262-ssec.6-pen"><block><txt break.before="1">Maximum penalty for <intref check="valid" refid="sec.262-ssec.6" target.guid="_1b67918d-78a7-40ed-a703-f77b4b0d63db">subsection (6)</intref>—3,000 penalty units or 2 years imprisonment.</txt></block></penalty></subclause></clause></chapter><chapter affected.by.uncommenced="0" guid="_efbd66d5-c8af-4da3-a99e-8386db195e46" id="ch.14"><no>Chapter 14</no><heading guid="_82dfeef7-9f5b-4c9c-b796-589749b1a103" id="ch.14-he">Miscellaneous</heading><clause affected.by.uncommenced="0" guid="_ecd0b5e5-4d86-485b-9365-59641190ac5e" id="sec.263" provision.type="other" spent.amends="0"><no>263</no><heading guid="_d2d84ad6-4216-4a89-b106-e9bfcbca0ed8" id="sec.263-he">Delegation by chief executive</heading><subclause affected.by.uncommenced="0" guid="_24326251-f2a1-4987-b79f-aa138f0a3450" id="sec.263-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may delegate the chief executive’s powers under this Act as the chief executive to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0400369f-5e90-4565-a257-3c664c1f6dad" id="sec.263-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an appropriately qualified—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_72f8c3b0-7317-4143-a573-5cd2e841ba42" id="sec.263-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">authorised person; or</txt></block></li><li guid="_15ed8b60-ff38-4d52-8ec7-45c2e3b1dbd9" id="sec.263-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">public service officer; or</txt></block></li></list></block></li><li guid="_df532601-d434-4f2e-8559-3b7da1b640b7" id="sec.263-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a local government.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ca5661d6-77f7-45f1-8349-7c93cbe24b15" id="sec.263-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A delegation of a chief executive’s power to a local government may permit the subdelegation of the power to an appropriately qualified entity.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_de5db943-fe3b-4881-9799-4a4a35280c95" id="sec.264" provision.type="other" spent.amends="0"><no>264</no><heading guid="_392618c7-49a1-4dc1-8c56-8d25badcecce" id="sec.264-he">General duties about documents or records</heading><subclause affected.by.uncommenced="0" guid="_e607c617-cc74-476e-92cd-24819d047a95" id="sec.264-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not, in relation to the administration of this Act, keep, produce or make use of a document or record the person knows, or ought reasonably to know, contains information that is false or misleading in a material particular.</txt></block><penalty guid="_a7aafc16-96a3-4401-b8ff-718785a632f7" id="sec.264-ssec.1-pen"><block><txt break.before="1">Maximum penalty—1,665 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_29056cb3-b7a9-4f27-8b72-d4fb9982c94a" id="sec.264-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A person who is required to keep a document under this Act must not, without a reasonable excuse—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a90f89ed-c2b1-4876-8342-b081c7a003e6" id="sec.264-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">keep it as an incorrect document; or</txt></block></li><li guid="_7f64abe2-b32e-432f-8a38-47fdfd76459b" id="sec.264-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">destroy, alter or damage it; or</txt></block></li><li guid="_7b4b07a4-7979-4651-9df9-71fb3a9d021a" id="sec.264-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">give it to the chief executive or an authorised person if the information contained in it is incorrect or incomplete in a material particular.</txt></block></li></list></block><penalty guid="_c95ed415-ab1e-4a28-98cc-c4ed45003334" id="sec.264-ssec.2-pen"><block><txt break.before="1">Maximum penalty—1,000 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_d22501f1-692e-4652-98fe-377b44143c94" id="sec.264-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, if a person contravenes <intref check="valid" refid="sec.264-ssec.1" target.guid="_e607c617-cc74-476e-92cd-24819d047a95">subsection (1)</intref> or <intref check="valid" refid="sec.264-ssec.2" target.guid="_29056cb3-b7a9-4f27-8b72-d4fb9982c94a">(2)</intref> with the intent to evade payment of the waste levy, the person is liable to a maximum penalty of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_50e8f913-2a51-461f-8d03-de9b3629001c" id="sec.264-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">2 years imprisonment; or</txt></block></li><li guid="_588541b0-5785-4c07-a00d-07550a233aa3" id="sec.264-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whichever is the greater of the following amounts—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9a504bc5-6b88-4c8e-bb04-ef2fb2b496fc" id="sec.264-ssec.3-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">2,000 penalty units;</txt></block></li><li guid="_9580eb85-58ba-4f5b-891c-1fce5c7c7c7e" id="sec.264-ssec.3-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a fine that is twice the waste levy amount the payment of which the person sought to evade, and twice the amount of any interest payable in relation to the failure to pay the waste levy amount by the due date for its payment.</txt></block></li></list></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_592f6a11-0e0e-46f5-b681-4d0faf515451" id="sec.265" provision.type="other" spent.amends="0"><no>265</no><heading guid="_259ed453-29a8-455a-b375-4c2b67bf609a" id="sec.265-he">Giving chief executive false or misleading information</heading><subclause affected.by.uncommenced="0" guid="_9189485e-40bc-439c-8632-aea2864cb898" id="sec.265-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not, in relation to the administration of this Act, give the chief executive information the person knows is false or misleading in a material particular.</txt><penalty guid="_12c29a19-9f68-481e-8aa2-4fc07cb6e1b0" id="sec.265-ssec.1-pen"><block><txt break.before="1">Maximum penalty—1,665 penalty units.</txt></block></penalty></block></subclause><subclause affected.by.uncommenced="0" guid="_8e5e7260-6bf1-4a5a-acfc-40958e4b2bc9" id="sec.265-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if the person gave the information to the chief executive with the intent to evade payment of the waste levy, the person is liable to a maximum penalty of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a3880a3c-7fa5-4349-a02d-ebec6c235a9b" id="sec.265-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">2 years imprisonment; or</txt></block></li><li guid="_f2a01285-5109-4247-960f-44146db189a1" id="sec.265-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whichever is the greater of the following amounts—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d7e52490-a5dc-4790-8535-5ecb0bcf4f90" id="sec.265-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">2,000 penalty units;</txt></block></li><li guid="_88fc3e50-6035-4915-9c86-fd32e6bace95" id="sec.265-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a fine that is twice the waste levy amount the payment of which the person sought to evade, and twice the amount of any interest payable in relation to the failure to pay the waste levy amount by the due date for its payment.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8b24834a-1538-401c-9953-2847f5e5bba9" id="sec.265-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0"><intref check="valid" refid="sec.265-ssec.1" target.guid="_9189485e-40bc-439c-8632-aea2864cb898">Subsection (1)</intref> applies to information given in relation to the administration of this Act whether or not the information was given in response to a specific power under this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ab649c02-b713-4bb1-b986-5ffe49031a7e" id="sec.265-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0"><intref check="valid" refid="sec.265-ssec.1" target.guid="_9189485e-40bc-439c-8632-aea2864cb898">Subsection (1)</intref> does not apply to a person if the person, when giving information in a document—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7d00c45b-7b2e-45cc-9779-972b69e3ad37" id="sec.265-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">tells the chief executive, to the best of the person’s ability, how the document is false or misleading; and</txt></block></li><li guid="_88987c1b-df3f-4574-9efd-2ee18166962b" id="sec.265-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the person has, or can reasonably obtain, the correct information—gives the correct information.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_570f277e-170a-456c-ab25-35ea1c3f6917" id="sec.265A" provision.type="other" spent.amends="0"><no>265A </no><heading guid="_a0ec624a-c690-4861-83e6-ea9ba9e0fe9e" id="sec.265A-he">Giving chief executive incomplete information</heading><subclause affected.by.uncommenced="0" guid="_9d61e5bb-e5b9-4162-a20b-0658f19d0369" id="sec.265A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to a person who is required under <intref check="valid" refid="ch.3" target.guid="_9d174c0e-d3d4-4fcd-b62c-7b3babd007b7">chapter 3</intref> to give a document to the chief executive.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4ea6948b-35f5-4b26-ab00-b69c01ccb12f" id="sec.265A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The person must not give the chief executive a document the person knows, or ought reasonably to know, contains incomplete information in a material particular.</txt><penalty guid="_c6d9f12d-46d2-4da1-9d13-f972a850ad28" id="sec.265A-ssec.2-pen"><block><txt break.before="1">Maximum penalty—1,665 penalty units.</txt></block></penalty></block></subclause><subclause affected.by.uncommenced="0" guid="_32676782-3a06-4a04-bf63-02b3abe68562" id="sec.265A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, if the person gave the document to the chief executive with the intent to evade payment of the waste levy, the person is liable to a maximum penalty of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_85fecfee-3393-4f81-84d1-79e4a8b9f116" id="sec.265A-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">2 years imprisonment; or</txt></block></li><li guid="_a6eeed8b-9290-4240-ad42-4b3aed669f2f" id="sec.265A-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whichever is the greater of the following amounts—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_16b6b678-fedf-42f2-a5eb-9c611a76f7a6" id="sec.265A-ssec.3-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">2,000 penalty units;</txt></block></li><li guid="_a900e027-283b-44a8-a69b-30c79c80c98e" id="sec.265A-ssec.3-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a fine that is twice the waste levy amount the payment of which the person sought to evade, and twice the amount of any interest payable in relation to the failure to pay the waste levy amount by the due date for its payment.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_165c273b-438a-49f3-bf27-632a7c822890" id="sec.265A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0"><intref check="valid" refid="sec.265A-ssec.2" target.guid="_4ea6948b-35f5-4b26-ab00-b69c01ccb12f">Subsection (2)</intref> does not apply to a person if the person, when giving document—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1e4d5a5f-33b3-485b-94c9-1a3e0a7949be" id="sec.265A-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">tells the chief executive of the extent to which the document is incomplete; and</txt></block></li><li guid="_f87fae25-7eb6-4a94-97bd-70403093151a" id="sec.265A-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the person has, or can reasonably obtain, the complete information—gives the information.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ff3d9404-90b9-4816-9af3-6974670e869e" id="sec.265A-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">It is enough for a complaint for an offence against <intref check="valid" refid="sec.265A-ssec.2" target.guid="_4ea6948b-35f5-4b26-ab00-b69c01ccb12f">subsection (2)</intref> to state the person knew, or ought reasonably to have known, the document was incomplete, without specifying whether the person knew it was incomplete or whether the person ought reasonably to have known it was incomplete.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3d7e059c-5b99-498f-a1a6-9e55d24e6e45" id="sec.266" provision.type="other" spent.amends="0"><no>266</no><heading guid="_5ab39c74-8513-4647-be8b-e183cc87fbb5" id="sec.266-he">Protection of officials from liability</heading><subclause affected.by.uncommenced="0" guid="_909f6f6f-a8e9-499f-9692-c126b4599ccc" id="sec.266-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An official does not incur civil liability for an act done, or omission made, honestly and without negligence under this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f1b63398-cf93-403a-9fa4-35afa5cb4379" id="sec.266-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If <intref check="valid" refid="sec.266-ssec.1" target.guid="_909f6f6f-a8e9-499f-9692-c126b4599ccc">subsection (1)</intref> prevents a civil liability attaching to an official, the liability attaches instead to the State.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2f3cafc5-7198-40a2-a860-ad08b44e2872" id="sec.266-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">This section does not apply to an official if the official is a <del xml:space="preserve">State employee within the meaning of</del><ins xml:space="preserve">prescribed person under</ins> the <del xml:space="preserve"><legref check="valid" jurisd="QLD" target.doc.id="act-2008-038" target.version.series="fb2a64ab-e90e-42c2-83db-24a42b4ba0d3" type="act"><name emphasis="yes">Public Service Act 2008</name></legref></del><ins xml:space="preserve"><legref check="unknown" jurisd="QLD" type="act"><name emphasis="yes">Public Sector Act 2022</name></legref></ins>, section <del xml:space="preserve"><legref check="valid" jurisd="QLD" refid="sec.26B" target.doc.id="act-2008-038" target.guid="_59dbe34d-a70f-4150-b479-597208df37ef" target.version.series="fb2a64ab-e90e-42c2-83db-24a42b4ba0d3" type="act">26B</legref><legref check="invalid" jurisd="QLD" type="act">(4)</legref></del><ins xml:space="preserve">267</ins>.</txt><note guid="_5dfade4d-bfa1-4ed3-83ff-cc00c6448008" id="sec.266-ssec.3-note" type="example"><heading change="ins" guid="_cbf05ca7-0f7d-4e86-8ef0-fc44146c597a" id="sec.266-ssec.3-note-he">Editor’s note—</heading><block><txt break.before="1"><ins xml:space="preserve">Section 266(3) incorporates an uncommenced amendment—see 2022 Act No. 34 s 365 sch 3.</ins></txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_e933d1b0-2965-40e5-b979-b86016645545" id="sec.266-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_b31d731e-b43f-46d6-a486-4cd6b3558e72" id="sec.266-ssec.4-def.official_"><txt break.before="1"><defterm guid="_f560b02c-47f6-4018-8d64-f856bd28a1e0" id="sec.266-ssec.4-def.official" type="definition">official</defterm> means any of the following persons—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_60a42cab-4bb6-4052-b869-967e9c145191" id="sec.266-ssec.4-def.official-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the Minister;</txt></block></li><li guid="_e23def6d-7ae1-4126-a143-d51f4b92e6df" id="sec.266-ssec.4-def.official-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an authorised person;</txt></block></li><li guid="_145112f1-06bf-4779-bee2-53a65925bbc2" id="sec.266-ssec.4-def.official-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a person acting under the direction of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4040f3eb-1ea3-47fe-a282-06ee72d8df99" id="sec.266-ssec.4-def.official-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a person mentioned in <intref check="valid" refid="sec.266-ssec.4-def.official-para1.a" target.guid="_60a42cab-4bb6-4052-b869-967e9c145191">paragraph (a)</intref> or <intref check="valid" refid="sec.266-ssec.4-def.official-para1.b" target.guid="_e23def6d-7ae1-4126-a143-d51f4b92e6df">(b)</intref>; or</txt></block></li><li guid="_ee32a0bf-6e75-483d-b140-e2910ebfd843" id="sec.266-ssec.4-def.official-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the chief executive.</txt></block></li></list></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_5127c36d-cdcd-4984-ab21-040fa97d9a46" id="sec.267" provision.type="other" spent.amends="0"><no>267</no><heading guid="_e94c2002-55f9-4ecd-b74f-540f6a9a9f2e" id="sec.267-he">Summary proceedings for offences</heading><subclause affected.by.uncommenced="0" guid="_290ac473-6dc8-4840-90e2-8e833ab93fba" id="sec.267-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Proceedings for an offence against this Act are to be taken in a summary way under the <legref check="valid" jurisd="QLD" target.doc.id="act-1886-017" target.version.series="506b5b47-5bcd-438c-b6a7-27cb65143289" type="act"><name emphasis="yes">Justices Act 1886</name></legref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_21a4097f-214c-4cf0-8be2-6f09906d50d5" id="sec.267-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A proceeding for an offence against this Act must start—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_079dae60-1bcf-4254-b257-40d7bbf0ce98" id="sec.267-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">within 1 year after the commission of the offence; or</txt></block></li><li guid="_01a8fb73-28e4-4ba8-ba7d-7041b4d26e45" id="sec.267-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">within 1 year after the offence comes to the complainant’s knowledge, but within—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a4764764-aa4b-44f6-8d08-e0d854bb3535" id="sec.267-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">for an offence against <intref check="valid" refid="sec.54" target.guid="_a0ffb14c-be84-401b-a7d8-b15021049659">section 54</intref>—6 years after the commission of the offence; or</txt></block></li><li guid="_e01d3366-dd79-46a1-b5de-2febed1f4c52" id="sec.267-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">otherwise—2 years after the commission of the offence.</txt></block></li></list></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_50bb8430-47e8-4c4a-bf17-3c946855ae54" id="sec.268" provision.type="other" spent.amends="0"><no>268</no><heading guid="_3d6e9d1d-0322-44d1-98bd-0731fd9e2164" id="sec.268-he">Executive officer may be taken to have committed offence</heading><subclause affected.by.uncommenced="0" guid="_53f07cc5-3401-46ad-af36-1bb3216a6441" id="sec.268-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a corporation commits an offence against a deemed executive liability provision, each executive officer of the corporation is taken to have also committed the offence if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d696adb9-ab62-4432-9457-13e3af5e09e8" id="sec.268-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the officer authorised or permitted the corporation’s conduct constituting the offence; or</txt></block></li><li guid="_fec77868-0b1e-4d49-802f-01dca2e85e3f" id="sec.268-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the officer was, directly or indirectly, knowingly concerned in the corporation’s conduct.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_4b3062d7-e006-45fa-a3e9-4a5e90b7dea6" id="sec.268-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The executive officer may be proceeded against for, and convicted of, the offence against the deemed executive liability provision whether or not the corporation has been proceeded against for, or convicted of, the offence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c46e8178-cf8a-4009-b36b-eb0a31350c95" id="sec.268-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">This section does not affect either of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_229bd2b0-954e-4806-b8fc-f2e9f3ce3611" id="sec.268-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the liability of the corporation for the offence against the deemed executive liability provision;</txt></block></li><li guid="_e161a6a5-a887-47d3-88b1-12a5d7e06aaf" id="sec.268-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the liability, under the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Criminal Code</name></legref>, <legref check="invalid" jurisd="QLD" refid="ch.2" target.doc.id="act-1899-009" target.version.series="19dc3aee-7313-4ba8-a7f6-7abf0c19b425" type="act">chapter 2</legref>, of any person, whether or not the person is an executive officer of the corporation, for the offence against the deemed executive liability provision.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_532eca0f-e7d3-4dc7-a89b-6d5ae26865ff" id="sec.268-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_05936710-1d9e-422c-accb-6c26b77d90d0" id="sec.268-ssec.4-def.deemedexecutiveliabilityprovision_"><txt break.before="1"><defterm guid="_11e13762-15ee-4336-b8b8-ff71f51e3849" id="sec.268-ssec.4-def.deemedexecutiveliabilityprovision" type="definition">deemed executive liability provision</defterm> means any of the following provisions—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f975c966-ad09-4034-a6fe-83a6c85a98dc" id="sec.268-ssec.4-def.deemedexecutiveliabilityprovision-para1" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="sec.104" target.guid="_428f4a48-281f-4088-8124-b981fb6fd86a">section 104</intref><intref check="valid" refid="sec.104-ssec.1" target.guid="_d4b52884-8745-4059-bece-7159bd221cc0">(1)</intref></txt></block></li><li guid="_9211ef7a-6b02-4c19-9a16-548b50c0b409" id="sec.268-ssec.4-def.deemedexecutiveliabilityprovision-para1-oc.2" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="sec.158" target.guid="_127325aa-09ca-453b-90f0-03554827f07c">section 158</intref><intref check="valid" refid="sec.158-ssec.1" target.guid="_04b24a97-d5e7-4d55-a995-a3ff3596ba87">(1)</intref> or <intref check="valid" refid="sec.158-ssec.2" target.guid="_909941b8-6640-44cb-91ec-e8747348e2be">(2)</intref></txt></block></li><li guid="_04921dcc-65ee-481f-9f86-610f15614970" id="sec.268-ssec.4-def.deemedexecutiveliabilityprovision-para1-oc.3" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="sec.173K" target.guid="_c36de416-fa8f-4e20-bd01-066635122f5b">section 173K</intref><intref check="valid" refid="sec.173K-ssec.2" target.guid="_dbd5cf41-db62-44d8-8caa-22104b1ad697">(2)</intref>.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c065c9df-0c75-4853-a9aa-ae2c5938176d" id="sec.269" provision.type="other" spent.amends="0"><no>269</no><heading guid="_6406375f-da61-413a-a42e-7f1919bbc6d0" id="sec.269-he">Application of Acts to local governments</heading><block><txt break.before="1">This Act, and for the purposes of this Act, other Acts apply to a local government in the same way as they apply to a body corporate.</txt></block></clause><clause affected.by.uncommenced="0" guid="_d0313588-0b15-45ec-b835-f7e6a9af4737" id="sec.270" provision.type="other" spent.amends="0"><no>270</no><heading guid="_e0d58296-73fa-4697-b791-7949170fa407" id="sec.270-he">Approval of forms</heading><block><txt break.before="1">The chief executive may approve forms for use under this Act.</txt></block></clause><clause affected.by.uncommenced="0" guid="_110b8e31-80ff-4c15-9d55-26afd5f43319" id="sec.271" provision.type="other" spent.amends="0"><no>271</no><heading guid="_1eec8712-b19a-4626-bc87-897ca718e5bb" id="sec.271-he">Regulation-making power</heading><subclause affected.by.uncommenced="0" guid="_26282157-6047-4676-86a7-f29d3f98166d" id="sec.271-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Governor in Council may make regulations under this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_63e8fe25-67e9-45a5-a6e1-77acbc9aa73a" id="sec.271-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.271-ssec.1" target.guid="_26282157-6047-4676-86a7-f29d3f98166d">subsection (1)</intref>, a regulation may provide for any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7af1fc4c-fe16-4fb6-87bc-0361129283d8" id="sec.271-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the removal, collection, transport, deposit, storage or disposal of waste;</txt></block></li><li guid="_eb82a2ea-1360-4180-a268-5724dd3fafb5" id="sec.271-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">setting standards, controls or procedures for the manufacture, generation, sale, use, transport, receival, storage, treatment or disposal of waste, including for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b1fe3ff4-9b58-47d4-881e-14ce56d00b75" id="sec.271-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">local government administration of waste; or</txt></block></li><li guid="_63629adf-0c1d-495f-855f-edd860636022" id="sec.271-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">waste tracking; or</txt></block></li><li guid="_d9297a27-1586-4a61-a4a1-4ae9d626b508" id="sec.271-ssec.2-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">dealing with polychlorinated biphenyls; or</txt></block></li><li guid="_a0ada295-4a4c-4e03-a929-61c0b8d4fc0e" id="sec.271-ssec.2-para1.b-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">managing clinical and related waste; or</txt></block></li><li guid="_25fe5780-7621-4ae4-b494-84c0c72657eb" id="sec.271-ssec.2-para1.b-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">used packaging materials; or</txt></block></li><li guid="_99146fe4-855c-4fd1-84ca-d1bf8c1d184a" id="sec.271-ssec.2-para1.b-para2.vi" provision.type="other"><no>(vi)</no><block><txt break.before="0">storage, disposal, receival or treatment of waste or equipment for dealing with waste;</txt></block></li></list></block></li><li guid="_8cb056bf-1417-48a1-bf49-26d89fca7ddd" id="sec.271-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">giving effect to, and enforcing compliance with, a national environment protection measure under a law forming part of a national scheme;</txt></block></li><li guid="_bf1d023e-4325-47a9-8364-79f5569e6133" id="sec.271-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">supporting and implementing national frameworks, objectives and priorities for waste management and resource recovery;</txt></block></li><li guid="_68ace3af-235f-4127-bfda-0a01e8e78e47" id="sec.271-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">setting the amounts of performance payments that may be payable to entities and the efficiency indicators and targets relevant to eligibility for payment;</txt></block></li><li guid="_80558bc1-171a-4bdc-beef-0a4139aa1d32" id="sec.271-ssec.2-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">the recycling efficiency threshold for recycling activities;</txt></block></li><li guid="_421ef4ec-567b-4e50-bc61-b9e4622ea58f" id="sec.271-ssec.2-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">the day, prescribed by regulation, by which the chief executive must review the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_26f0ab27-a967-4351-97ba-70f105c7c8f5" id="sec.271-ssec.2-para1.g-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the discounted rate for the waste levy for residue waste;</txt></block></li><li guid="_bbc125a1-dcc0-4297-9fdc-94018095c6be" id="sec.271-ssec.2-para1.g-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the recycling efficiency threshold for recycling activities;</txt></block></li><li guid="_bfe7264f-bef7-4f26-a199-d7e2230d103d" id="sec.271-ssec.2-para1.g-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">any other matters mentioned in <intref check="valid" refid="ch.3" target.guid="_9d174c0e-d3d4-4fcd-b62c-7b3babd007b7">chapter 3</intref>, <intref check="valid" refid="ch.3-pt.4" target.guid="_e24fd547-58ff-4e2e-9d73-08552be41811">part 4</intref> as being prescribed by regulation.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a1f717e3-059f-494b-91c4-bce7e2e3646a" id="sec.271-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A regulation may provide—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_08644d05-6b50-4511-8b74-0b45b66bb195" id="sec.271-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for fees payable under this Act and the matters for which they are payable; and</txt></block></li><li guid="_e4642fe2-4f85-4668-9ce8-6cc8c088867c" id="sec.271-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for a maximum penalty of 20 penalty units for a contravention of the regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d29d6d0c-b407-4aff-869a-08127647fb6b" id="sec.271-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Subject to the <legref check="invalid" jurisd="CTH" type="act"><name emphasis="yes">National Measurement Act 1960</name> (Cwlth)</legref>, a regulation may impose requirements for a weighbridge that are additional to the requirements applying to the weighbridge under another Act or under a law of the Commonwealth.</txt></block></subclause></clause></chapter><chapter affected.by.uncommenced="0" guid="_e29e6029-0de7-4179-b4b5-dc009e83ff1d" id="ch.15"><no>Chapter 15</no><heading guid="_1e7e8e88-45ad-4386-87bc-c1e3b4d0b1dd" id="ch.15-he">Transitional provisions for Act No. 31 of 2011</heading><part affected.by.uncommenced="0" guid="_cb874e86-2711-4689-b761-86215eb8de6d" id="ch.15-pt.1"><no>Part 1</no><heading guid="_5e9d2531-d7a2-44c2-b885-ac340c5b0446" id="ch.15-pt.1-he">Transitional provisions relating to approvals under the <legref check="valid" jurisd="QLD" target.doc.id="sl-2000-0178" target.version.series="f7154fab-7553-48a9-8cc4-ca5d18bf7e1c" type="subordleg"><name emphasis="no">Environmental Protection (Waste Management) Regulation 2000</name></legref></heading><clause affected.by.uncommenced="0" guid="_38e8727a-e306-4872-81a5-355f4db74840" id="sec.272" provision.type="transitional" spent.amends="0"><no>272</no><heading guid="_9b8692b5-1912-40d5-83d1-5923b8a75402" id="sec.272-he">Interpretation for pt 1</heading><subclause affected.by.uncommenced="0" guid="_28148388-4168-4d11-955c-2126e1f44120" id="sec.272-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">In this part—</txt><deflist><definition affected.by.uncommenced="0" guid="_859bbe51-88ab-4ed2-a6cf-6db6ffeb6381" id="sec.272-ssec.1-def.commencement_"><txt break.before="1"><defterm guid="_0f9f4e0f-be52-4a46-b2af-4a7bbb13751e" id="sec.272-ssec.1-def.commencement" type="definition">commencement</defterm> means the commencement of this part.</txt></definition><definition affected.by.uncommenced="0" guid="_03c9e40b-5ebd-425a-b851-6cf168d37fe7" id="sec.272-ssec.1-def.EnvironmentalProtectionAct_"><txt break.before="1"><defterm guid="_32c7cd45-20eb-4650-947c-6e1384ee06ed" id="sec.272-ssec.1-def.EnvironmentalProtectionAct" type="definition">Environmental Protection Act</defterm> means the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act"><name emphasis="yes">Environmental Protection Act 1994</name></legref> as in force before the commencement.</txt></definition><definition affected.by.uncommenced="0" guid="_d232ce21-d405-46c7-8967-2d7ac00e9316" id="sec.272-ssec.1-def.existingapproval_"><txt break.before="1"><defterm guid="_2c206f58-4f39-4f90-ab2d-912da088e38c" id="sec.272-ssec.1-def.existingapproval" type="definition">existing approval</defterm> means an existing general approval or an existing specific approval.</txt></definition><definition affected.by.uncommenced="0" guid="_591adbb5-9132-41d9-bafc-affc0c3315c3" id="sec.272-ssec.1-def.existinggeneralapproval_"><txt break.before="1"><defterm guid="_88611ee1-25a2-4ffe-8c59-06b8e108c2fb" id="sec.272-ssec.1-def.existinggeneralapproval" type="definition">existing general approval</defterm> means a general approval under the repealed provision in force immediately before the commencement.</txt></definition><definition affected.by.uncommenced="0" guid="_91c70d5f-5c0a-43cc-82ab-944e81adfee0" id="sec.272-ssec.1-def.existingspecificapproval_"><txt break.before="1"><defterm guid="_5ed8aabb-9823-4d9d-9d72-e8570ec54c01" id="sec.272-ssec.1-def.existingspecificapproval" type="definition">existing specific approval</defterm> means a specific approval under the repealed provision in force immediately before the commencement.</txt></definition><definition affected.by.uncommenced="0" guid="_b82064b9-82e2-4158-9878-80cfa6853355" id="sec.272-ssec.1-def.repealedprovision_"><txt break.before="1"><defterm guid="_f9a46ce5-5b7d-4ec3-a711-5947fc772f7a" id="sec.272-ssec.1-def.repealedprovision" type="definition">repealed provision</defterm> means the <legref check="valid" jurisd="QLD" target.doc.id="sl-2000-0178" target.version.series="f7154fab-7553-48a9-8cc4-ca5d18bf7e1c" type="subordleg"><name emphasis="yes">Environmental Protection (Waste Management) Regulation 2000</name></legref>, <legref check="invalid" jurisd="QLD" refid="pt.6A" target.doc.id="sl-2000-0178" target.version.series="f7154fab-7553-48a9-8cc4-ca5d18bf7e1c" type="subordleg">part 6A</legref>, as in force before the commencement.</txt></definition></deflist></block></subclause><subclause affected.by.uncommenced="0" guid="_ae2317f0-6c40-429b-9483-4698ab036281" id="sec.272-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this part, a reference to the Environmental Protection Act in relation to a right of review or appeal includes, if the context permits, a reference to the <legref check="valid" jurisd="QLD" target.doc.id="sl-2000-0178" target.version.series="f7154fab-7553-48a9-8cc4-ca5d18bf7e1c" type="subordleg"><name emphasis="yes">Environmental Protection (Waste Management) Regulation 2000</name></legref>, <legref check="invalid" jurisd="QLD" refid="pt.7" target.doc.id="sl-2000-0178" target.version.series="f7154fab-7553-48a9-8cc4-ca5d18bf7e1c" type="subordleg">part 7</legref>, <legref check="invalid" jurisd="QLD" refid="pt.7-div.3" target.doc.id="sl-2000-0178" target.version.series="f7154fab-7553-48a9-8cc4-ca5d18bf7e1c" type="subordleg">division 3</legref>, as in force before the commencement.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_35a759a2-857e-4f19-911f-a3e041b099ee" id="sec.273" provision.type="transitional" spent.amends="0"><no>273</no><heading guid="_72d18ba7-e69a-47e6-9264-50b7225ec8b6" id="sec.273-he">Matters relating to existing approvals</heading><subclause affected.by.uncommenced="0" guid="_aefe249d-01c0-4745-9be3-fa18df098265" id="sec.273-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">On the commencement an existing approval is taken to be an approval of the same type granted under chapter 8 of this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_dda3eca7-4309-41b0-9221-408386e85348" id="sec.273-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Subject to this Act, the existing approval remains in force for the remaining period of the approval.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fd90e704-a098-4d4c-a1ed-3198071fbc3c" id="sec.273-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Subsection (4) applies in relation to any transfer, amendment, cancellation or suspension of an existing approval (the <defterm guid="_c43f60ae-5d0b-4636-baa5-c5e93c771df1" id="sec.273-def.relevantaction" type="definition">relevant action</defterm>) the process for which has commenced but has not been finalised under the repealed provision immediately before the commencement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a9391a3f-6719-4db2-93a9-6f0a5a9b47ce" id="sec.273-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The relevant action may continue under the repealed provision as if this Act had not been enacted and the result of the relevant action applies to an existing approval as an approval under chapter 8 of this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_91562146-2bf7-4b41-b3e6-3547bd16c804" id="sec.273-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">However, the review and appeal rights relating to the relevant action under the Environmental Protection Act continue to apply as if this Act had not been enacted.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0d348aba-d45a-4f80-9bfc-270e1d2acd12" id="sec.274" provision.type="transitional" spent.amends="0"><no>274</no><heading guid="_04c461b4-84be-4331-a0d5-06a29f542d62" id="sec.274-he">Applications for approvals made before the commencement</heading><subclause affected.by.uncommenced="0" guid="_39100732-9357-492b-8959-9cf47e57748f" id="sec.274-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to an application for an approval made under the repealed provision, but not finally dealt with, before the commencement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_06d9c99b-75b5-4dac-9ba6-de5bfbd15b4d" id="sec.274-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application may continue to be dealt with under the repealed provision as if this Act had not been enacted.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_436d779f-39ce-489a-93b9-5677585c77d5" id="sec.274-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the approval is granted, it is taken to be an approval of the same type granted under chapter 8 of this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_edce81fa-8d3a-48f1-b45a-4c5b961ebee7" id="sec.274-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The review and appeal rights relating to the application, or an approval granted on the application, under the Environmental Protection Act continue to apply as if this Act had not been enacted.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_81eb9f4d-042d-438f-b987-8ba9cc1674bf" id="sec.275" provision.type="transitional" spent.amends="0"><no>275</no><heading guid="_53a14ef6-fecf-4f16-8702-7291e073021b" id="sec.275-he">Reviews and appeals</heading><subclause affected.by.uncommenced="0" guid="_27746f0a-80eb-4e02-8535-a24e7bd86e49" id="sec.275-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A review or appeal under the Environmental Protection Act relating to a matter under the repealed provision that has started but not been finalised before the commencement may continue as if this Act had not been enacted.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1c2952c4-937d-4405-a6ce-700f29864a22" id="sec.275-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A right of appeal under the Environmental Protection Act relating to a decision on a review mentioned in subsection (1) continues as if this Act had not been enacted.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_08fe73cf-c213-49a0-9db7-9336ba0d4139" id="sec.275-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If, immediately before the commencement, a person has a right of review or appeal under the Environmental Protection Act relating to a matter under the repealed provision, the right continues as if this Act had not been enacted.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_69446cdb-a05a-435c-9316-1d3ddcc09955" id="sec.275-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">On a review or appeal mentioned in this part the reviewer or court may make any order necessary or convenient to be made to assist the transition of an approval under the repealed provision as an approval under chapter 8 of this Act.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_5136ebe8-1027-4a46-bc5e-a695e22adf18" id="sec.276" provision.type="transitional" spent.amends="0"><no>276</no><heading guid="_a7b1fc3a-d123-434c-bd84-f0347e3f5d0a" id="sec.276-he">Offences</heading><subclause affected.by.uncommenced="0" guid="_999d7eec-67c7-435d-a7af-632c693671a3" id="sec.276-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Proceedings for an offence against the repealed provision may be continued or started and the provisions of the Environmental Protection Act necessary or convenient to be used in relation to the proceedings continue to apply as if this Act had not been enacted.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3316e7e2-d0da-4774-86e3-152e289a0bc2" id="sec.276-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For subsection (1), the <legref check="valid" jurisd="QLD" target.doc.id="act-1954-003" target.version.series="3cfb010e-ce09-4afd-baf6-bd10d22741a7" type="act"><name emphasis="yes">Acts Interpretation Act 1954</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.20" target.doc.id="act-1954-003" target.guid="_c17d849c-f09e-4b5c-8f88-21070166e68b" target.version.series="3cfb010e-ce09-4afd-baf6-bd10d22741a7" type="act">section 20</legref>, applies, but does not limit the subsection.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_4b079bbb-75fd-4d5b-84cd-75922e89c7f7" id="ch.15-pt.2"><no>Part 2</no><heading guid="_85fe7d21-2dca-4fe2-8e40-d2a65d8968a7" id="ch.15-pt.2-he">Discounted levy for residue waste disposal until 30 June 2014</heading><clause affected.by.uncommenced="0" guid="_047ca585-b7f9-4c63-afad-0f43c052de4b" id="sec.277" provision.type="other" spent.amends="0"><no>277</no><heading guid="_4d589b39-b32e-446f-a493-a9a03895549f" id="sec.277-he">Definition for <intref check="valid" refid="ch.15-pt.2" target.guid="_4b079bbb-75fd-4d5b-84cd-75922e89c7f7">pt 2</intref></heading><block><txt break.before="1">In this part—</txt><deflist><definition affected.by.uncommenced="0" guid="_82ce45ce-87c4-41a9-b11f-7760aafc7a0a" id="sec.277-def.residuewaste_"><txt break.before="1"><defterm guid="_519195b9-2914-4a74-a385-ac9e5064c54b" id="sec.277-def.residuewaste" type="definition">residue waste</defterm> means the waste from a recycling activity that is commonly disposed of to landfill after the recoverable components have been removed from material.</txt><note guid="_821a34ca-f30d-41c0-a2be-564c9b799567" id="sec.277-def.residuewaste-note" type="example"><heading guid="_6ddaa0a4-56df-4401-832e-5112ef013007" id="sec.277-def.residuewaste-note-he">Example of residue waste—</heading><block><txt break.before="1">In metal recycling, the residue waste is the mainly non-metal component that results from recycling products such as motor vehicles, whitegoods, televisions and computers that have reached the end of their useful life.</txt></block></note></definition></deflist></block></clause><clause affected.by.uncommenced="0" guid="_7f3ec353-009f-4a48-89b2-865ec118653f" id="sec.278" provision.type="other" spent.amends="0"><no>278</no><heading guid="_d3dfdcd6-4899-4443-8694-cf0c99ba3e5c" id="sec.278-he">Application for discounting of waste levy amount</heading><subclause affected.by.uncommenced="0" guid="_17fe020a-df11-4ccd-886b-b255044e338c" id="sec.278-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person who conducts a recycling activity may make an application (a <defterm guid="_a3e8b18d-682c-4d27-bc5d-9f1b47949ee6" id="sec.278-def.residuewastediscountingapplication" type="definition">residue waste discounting application</defterm>) asking the chief executive to approve a discounted rate for the waste levy to residue waste identified in the application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_be76fd65-76ae-4683-a286-7a9f04d1ff95" id="sec.278-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application must be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_996bb7ac-17ba-42ca-930e-fa88744878af" id="sec.278-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in the approved form; and</txt></block></li><li guid="_6d09d623-72fa-43fd-bb30-f2910a5036e3" id="sec.278-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">supported by enough information to allow the chief executive to decide the application; and</txt></block></li><li guid="_b8c6a181-5e9c-4c4d-b774-4fe3cd3592b8" id="sec.278-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">accompanied by the fee prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e7752cba-e844-4f53-a5c0-a762e2e81432" id="sec.278-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">This section does not limit <intref check="valid" refid="sec.38" target.guid="_d9f9a129-e415-459a-b7ef-1b4ae2542291">section 38</intref><intref check="invalid" refid="sec.38-ssec.4">(4)</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_20852c02-81de-4cf1-ab92-14dd78ab7068" id="sec.279" provision.type="other" spent.amends="0"><no>279</no><heading guid="_e07c2a79-0066-4824-8917-6e6cfc84b85b" id="sec.279-he">Chief executive may require additional information</heading><subclause affected.by.uncommenced="0" guid="_369bd151-ad2a-41b9-9f85-59843b2d1243" id="sec.279-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may, by notice given to the applicant within 10 business days after receiving the application, require the applicant under a residue waste discounting application to give the chief executive further reasonable information or documents about the application by a reasonable date stated in the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_82fca6ac-3424-4202-a233-be66a4a51107" id="sec.279-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may refuse the application if the applicant does not give the chief executive the further information or documents by the stated date, or a later date agreed between the chief executive and the applicant, without reasonable excuse.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5ac3ba92-de3b-411c-b52b-e6259d8f2364" id="sec.279-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The applicant may, before the stated date, agree with the chief executive about extending the time for providing the further information.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3e4fa71d-4bbb-4fbb-b70a-3bd4892be621" id="sec.280" provision.type="other" spent.amends="0"><no>280</no><heading guid="_b42cda84-9319-465e-af6f-bfc68e570161" id="sec.280-he">Deciding application</heading><subclause affected.by.uncommenced="0" guid="_e4ddaf68-5207-486a-acbc-e2aff13bd39f" id="sec.280-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must decide either to grant or refuse the application within 10 business days after the later of the following days—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c924d2d5-2e59-4d73-af14-551acbc1c5cb" id="sec.280-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the day the chief executive receives the application;</txt></block></li><li guid="_d10c4408-4d30-43b8-be81-11a98798154e" id="sec.280-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if additional information is requested under <intref check="valid" refid="sec.279" target.guid="_20852c02-81de-4cf1-ab92-14dd78ab7068">section 279</intref>—the day the chief executive receives the information.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f0e40917-cbe1-4d3e-a04c-68c405306b7e" id="sec.280-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A failure to make a decision under this section is taken to be a decision by the chief executive to refuse the application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fc11d7ec-67f3-4868-89a5-b98c31565357" id="sec.280-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In deciding whether to grant the application, the chief executive must consider the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c3893165-5f91-4c90-b150-6257f7423ea2" id="sec.280-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the objects of this Act;</txt></block></li><li guid="_c2b1bf6b-edee-4dfd-aa8e-cd1300886c45" id="sec.280-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the information included in the application;</txt></block></li><li guid="_6f0612db-f433-4bd9-a62d-d6187bc2e442" id="sec.280-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">any criteria prescribed under a regulation (the <defterm guid="_56c21733-c9d0-433f-a785-c62cc5f7e470" id="sec.280-ssec.3-def.residuewastediscountedlevyratecriteria" type="definition">residue waste discounted levy rate criteria</defterm>).</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ddf03b65-8ca8-4fc8-8de5-84a14db64a3f" id="sec.280-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The residue waste discounted levy rate criteria must include, for each type of residue waste, a residue waste efficiency threshold requirement to be met by the applicant.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_139dfbcd-22c8-4e7a-b9e9-b5f4d4056b01" id="sec.281" provision.type="other" spent.amends="0"><no>281</no><heading guid="_650420ea-bf21-47ed-9f61-26b11a5f1ad6" id="sec.281-he">Grant of application</heading><subclause affected.by.uncommenced="0" guid="_b4b4a69b-1278-4a9a-ae38-a3c138b25339" id="sec.281-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the chief executive grants the application, the chief executive must, within 5 business days, give the applicant notice of the grant stating the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7755c989-6668-4309-acc0-437f848ba217" id="sec.281-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the application has been granted;</txt></block></li><li guid="_fc0ae78a-73cf-444b-aa94-0245e69a3dd2" id="sec.281-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the discounted rate of waste levy that is to apply to the residue waste the subject of the application, which must be the discounted rate prescribed under a regulation for the residue waste;</txt></block></li><li guid="_8f1833d9-5882-4545-bd1e-1b54d9f72de8" id="sec.281-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the period of the approval, which must not exceed 1 year and must not apply after 30 June 2014;</txt></block></li><li guid="_72638a6d-5f88-468b-ae6b-8cf9f9b6c679" id="sec.281-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">any conditions imposed on the approval.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_02aeb1e5-0eec-47ce-af85-886783e64942" id="sec.281-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Also, if the chief executive imposes any conditions on the approval, the notice must include or be accompanied by an information notice for the decision to impose the conditions.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3e9f2e3e-10ab-4c65-9633-3b01f24301ed" id="sec.281-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.281-ssec.2" target.guid="_02aeb1e5-0eec-47ce-af85-886783e64942">subsection (2)</intref> does not apply to a condition that is the same, or substantially the same, as a condition agreed to or asked for by the applicant.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c571290d-9fa5-411e-a522-a852a9923693" id="sec.282" provision.type="other" spent.amends="0"><no>282</no><heading guid="_50295700-38e7-4104-8a9f-557cd6b95fa4" id="sec.282-he">Refusal of application</heading><block><txt break.before="1">If the chief executive decides to refuse the application, the chief executive must, within 5 business days, give the applicant an information notice for the decision.</txt></block></clause><clause affected.by.uncommenced="0" guid="_99b2ad3d-8034-48a5-aad1-4404d0c498fd" id="sec.283" provision.type="other" spent.amends="0"><no>283</no><heading guid="_bc05e072-8c27-40b8-ad52-4eea5efde39e" id="sec.283-he">Cancellation of grant</heading><subclause affected.by.uncommenced="0" guid="_5d7e809e-fa7c-4759-8b60-c8ea8a1406ee" id="sec.283-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the chief executive has granted a residue waste discounting application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_03ecef72-ef50-48b9-8fae-f0b8793db899" id="sec.283-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may cancel the grant of the application if the chief executive considers there are reasonable grounds to cancel it.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bce899e0-a7ef-4a59-8eab-51636c00c52c" id="sec.283-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.283-ssec.2" target.guid="_03ecef72-ef50-48b9-8fae-f0b8793db899">subsection (2)</intref>, grounds may include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b5ad7cbb-d0e2-473e-84f3-e4e0189f62fb" id="sec.283-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that there is a reasonable suspicion that the application was granted because of a false or misleading representation or declaration; or</txt></block></li><li guid="_d47c5053-54b9-4044-b3bf-bd8a1cec2c22" id="sec.283-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that the circumstances that were relevant to the granting of the application have changed; or</txt></block></li><li guid="_a117dbe8-aced-45bb-b434-7edfd9ce1371" id="sec.283-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that the conditions included in the granting of the application have not been complied with; or</txt></block></li><li guid="_67259cbd-fd81-4c53-8cb1-fa4a25f9e7e3" id="sec.283-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">that it is desirable to cancel the grant having regard to the objects of this Act.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_5d500cf1-996c-480a-aa52-1884359cf65b" id="sec.284" provision.type="other" spent.amends="0"><no>284</no><heading guid="_9e1f45d4-4b75-43ea-a7f4-91fa54e04b7f" id="sec.284-he">Procedure for cancelling grant of residue waste discounting application</heading><subclause affected.by.uncommenced="0" guid="_e28f710e-4ac1-4a92-b8ac-dff7c89429a4" id="sec.284-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the chief executive proposes to cancel the grant of a residue waste discounting application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_cf84b50d-c8b4-479e-bd49-f1a3ce4f1cb7" id="sec.284-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive must give notice to the holder of the grant.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f0feb7df-b390-4464-b820-8e0be8bef5aa" id="sec.284-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The notice must state the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e1659bd0-c563-46c9-9b52-f48db7674f84" id="sec.284-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that the chief executive proposes to cancel the grant of the application;</txt></block></li><li guid="_7931f060-e02f-449b-90c7-402783580cc9" id="sec.284-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the grounds for the proposed cancellation;</txt></block></li><li guid="_c4f93b86-05cc-460a-a175-cfbd451c56c5" id="sec.284-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the facts and circumstances that form the basis for the grounds;</txt></block></li><li guid="_3cbb789a-154b-443e-8102-8d1ca0f6421e" id="sec.284-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">when the proposed cancellation is intended to take effect;</txt></block></li><li guid="_b0f8530f-2383-4ee4-b167-4f19d83e9bce" id="sec.284-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">that the holder may make, within a stated period, written submissions to show why the proposed cancellation should not be carried out.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1eb096d6-a7b3-4088-9895-5dc899333541" id="sec.284-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The stated period must end at least 15 business days after the holder is given the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_75094684-16e8-42f7-9655-99a4b6c54be7" id="sec.284-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The chief executive must consider any submissions made under <intref check="valid" refid="sec.284-ssec.3" target.guid="_f0feb7df-b390-4464-b820-8e0be8bef5aa">subsection (3)</intref><intref check="valid" refid="sec.284-ssec.3-para1.e" target.guid="_b0f8530f-2383-4ee4-b167-4f19d83e9bce">(e)</intref> within the stated period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5336acdb-81a6-4732-9527-eb34d85bdb06" id="sec.284-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">If the chief executive decides to cancel the grant of the application, the chief executive must, within 10 business days after making the decision, give the holder of the grant an information notice for the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_03cebf5a-34fa-43ec-b942-049f33e8dc72" id="sec.284-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">The decision takes effect when the information notice is given.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_45fe1e76-8ef1-48c4-b16d-4fa43cd33d3a" id="sec.285" provision.type="other" spent.amends="0"><no>285</no><heading guid="_c5048f26-e149-42be-9abd-b6d557d03734" id="sec.285-he">Automatic cancellation of grant</heading><block><txt break.before="1">The grant of a residue waste discounting application is automatically cancelled if the business of conducting a recycling activity that was relevant to the application ceases to be in the grant holder’s ownership, including, for example, because the business is transferred into the ownership of another entity.</txt></block></clause></part><part affected.by.uncommenced="0" guid="_97fdfb4c-4df7-46a5-9c83-7647ccd8df35" id="ch.15-pt.3"><no>Part 3</no><heading guid="_1490ccc9-6586-4638-8fa0-8d1f1032f7ca" id="ch.15-pt.3-he">Exemption from waste levy for residue waste until 30 June 2014</heading><clause affected.by.uncommenced="0" guid="_c92daf9d-b96e-46f9-9556-7e4bf122d288" id="sec.286" provision.type="other" spent.amends="0"><no>286</no><heading guid="_e1eea2dc-71b4-40a7-ad8d-568a5dfe80d5" id="sec.286-he">Definition for <intref check="valid" refid="ch.15-pt.3" target.guid="_97fdfb4c-4df7-46a5-9c83-7647ccd8df35">pt 3</intref></heading><block><txt break.before="1">In this part—</txt><deflist><definition affected.by.uncommenced="0" guid="_f4afa6e6-434f-4070-a876-9e2a156267b3" id="sec.286-def.transitionperiod_"><txt break.before="1"><defterm guid="_9f7b57ed-dc04-4f88-a6e2-5ca3ee59d69d" id="sec.286-def.transitionperiod" type="definition">transition period</defterm> means the period starting on 1 December 2011 and ending on 30 June 2014.</txt></definition></deflist></block></clause><clause affected.by.uncommenced="0" guid="_52dd02da-a675-4612-afd5-23832d9607f9" id="sec.287" provision.type="other" spent.amends="0"><no>287</no><heading guid="_decbf36e-bfcb-4cff-9a38-475243f44658" id="sec.287-he">Application for approval of residue waste as exempt waste for transition period</heading><subclause affected.by.uncommenced="0" guid="_4769f697-184d-41a2-b485-de04d1a70871" id="sec.287-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An entity that conducts a recycling activity may, not later than 30 June 2012, make an application (a <defterm guid="_3477043f-b9ca-48eb-9c07-2cf3485a6184" id="sec.287-def.transitionperiodexemptresiduewasteapplication" type="definition">transition period exempt residue waste application</defterm>) to the chief executive asking the chief executive to approve that residue waste identified in the application is exempt waste in the transition period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_dd0f8f25-a721-47af-b549-f07539b54bf4" id="sec.287-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A transition period exempt residue waste application must be an application for an approval having effect for a period ending not later than 30 June 2014.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_014e6c13-c96b-4e29-9b35-84df925ea147" id="sec.287-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The application must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_255b7ad3-6df4-49b0-b00d-2378e6c6bd6f" id="sec.287-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li guid="_2a00050e-cb54-4f98-b1b7-25db9e231248" id="sec.287-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state the name, location and activities of the applicant’s facilities that produce residue waste; and</txt></block></li><li guid="_1457608e-356e-487d-81ac-d9c0f439aa53" id="sec.287-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">state the amount and type of residue waste the subject of the application that is expected to be produced in the period for which the approval is to have effect; and</txt></block></li><li guid="_ee5fab1a-44a3-4a66-9f10-031bcd716d17" id="sec.287-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">include information that shows the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_53aa6b19-5af9-4424-bb73-ad114e29afaf" id="sec.287-ssec.3-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">conduct of a recycling activity by the applicant on or before 1 December 2011;</txt></block></li><li guid="_354aca2f-c87a-452b-95fd-4841d448d675" id="sec.287-ssec.3-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">that the applicant meets any residue waste efficiency threshold requirements under the residue waste discounted levy rate criteria;</txt></block></li><li guid="_f4f776d9-42a5-4271-8a19-a2c156fb6762" id="sec.287-ssec.3-para1.d-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">that payment of the waste levy on the residue waste, even at the discounted rate available under <intref check="valid" refid="ch.15-pt.2" target.guid="_4b079bbb-75fd-4d5b-84cd-75922e89c7f7">part 2</intref>, would cause the applicant financial hardship to an extent that would stop its business from operating;</txt></block></li><li guid="_c1d768a3-1fba-4f4c-8b46-bc3f88616c92" id="sec.287-ssec.3-para1.d-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">the applicant has put measures in place to progressively minimise the amount of its residue waste generation.</txt></block></li></list></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c1c0853d-3124-4cce-a673-3b738e17ff8f" id="sec.288" provision.type="other" spent.amends="0"><no>288</no><heading guid="_05b17095-db32-4d47-90a1-a54bac4c9a9f" id="sec.288-he">Chief executive may require additional information</heading><subclause affected.by.uncommenced="0" guid="_a4a6c6de-6599-49b4-bb17-c9b744ee5511" id="sec.288-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may, by notice, require the applicant to give the chief executive further reasonable information or documents about the application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9c0a4aad-59c4-4e62-8db9-3166a57331bf" id="sec.288-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may refuse the application if the applicant does not give the chief executive the further information or documents, without reasonable excuse.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e273b37b-4546-48a9-8988-3d564f530bc0" id="sec.289" provision.type="other" spent.amends="0"><no>289</no><heading guid="_7fdea45d-215c-44b7-b471-840f4bcea30b" id="sec.289-he">Deciding application</heading><subclause affected.by.uncommenced="0" guid="_9383721b-39c3-4dba-a14b-2618ffe44134" id="sec.289-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must decide either to grant or refuse the application within a time that is reasonable in the circumstances.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_041e073c-6a30-491d-a08d-c033ab74bfcc" id="sec.289-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A failure to make a decision under this section is taken to be a decision by the chief executive to refuse the application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d2063b8f-c776-4f16-9c76-b855264dc080" id="sec.289-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In deciding whether to grant the application, the chief executive must consider the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3ab5a825-8c59-4805-ac15-e81dc9b171ba" id="sec.289-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the objects of this Act;</txt></block></li><li guid="_24e18b15-d294-4741-a29b-6d22e28cdb40" id="sec.289-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the information included in the application;</txt></block></li><li guid="_81a378b5-8b28-4311-a42a-d23f6fd1f24f" id="sec.289-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">whether adequate measures have been put in place to progressively minimise the amount of the applicant’s residue waste generation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c1249560-53f9-4cfd-93e5-ccde5d13a958" id="sec.289-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Also, the chief executive may consult with any expert reference group or other entity the chief executive considers suitable to provide advice in relation to financial hardship.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a5f0717b-064d-4958-95f4-58b9e524687e" id="sec.289-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In deciding to grant the application, the chief executive must be satisfied of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_eaaca795-5eff-4086-a04f-6ca8fba19204" id="sec.289-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">conduct of a recycling activity by the applicant on or before 1 December 2011;</txt></block></li><li guid="_2e15a372-af88-439e-bc0f-0db45cf06533" id="sec.289-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that the applicant meets any residue waste efficiency threshold requirements under the residue waste discounted levy rate criteria;</txt></block></li><li guid="_3b92650a-79b9-4a10-9c7c-575414940b73" id="sec.289-ssec.5-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that payment of the waste levy on the residue waste, even at the discounted rate available under <intref check="valid" refid="ch.15-pt.2" target.guid="_4b079bbb-75fd-4d5b-84cd-75922e89c7f7">part 2</intref>, would cause the applicant financial hardship to an extent that would stop its business from operating.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c9185203-3e22-4b6c-aff0-42580b583571" id="sec.290" provision.type="other" spent.amends="0"><no>290</no><heading guid="_683dc8c1-c16e-4e50-93fc-c5759e8937dc" id="sec.290-he">Grant of application</heading><subclause affected.by.uncommenced="0" guid="_1bfc8fbe-dc75-4603-9c93-111d7486573f" id="sec.290-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the chief executive grants the application, the chief executive must give the applicant notice of the grant stating the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_13f23b64-9739-4f64-95bd-88450dacda7e" id="sec.290-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the application has been granted;</txt></block></li><li guid="_a90ed5cb-cb74-46dd-ada8-6b50c581eff3" id="sec.290-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the period, which must end on or before the end of the transition period, for which the residue waste identified in the application is approved to be exempt waste;</txt></block></li><li guid="_0f2bc4e0-6a5e-4086-b88f-0c403297809f" id="sec.290-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">any conditions imposed on the approval including any limits on the types and amounts of residue waste that may be disposed of as exempt waste in the period mentioned in <intref check="valid" refid="sec.290-ssec.1-para1.b" target.guid="_a90ed5cb-cb74-46dd-ada8-6b50c581eff3">paragraph (b)</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2c2146e3-a795-4674-b08a-12c2a57688c8" id="sec.290-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Also, if the chief executive imposes any conditions on the approval, the notice must include or be accompanied by an information notice for the decision to impose the conditions.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_38122570-424b-4781-8341-576a4a7b7059" id="sec.290-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.290-ssec.2" target.guid="_2c2146e3-a795-4674-b08a-12c2a57688c8">subsection (2)</intref> does not apply to a condition that is the same, or substantially the same, as a condition agreed to or asked for by the applicant.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_ed7d40be-0682-4a86-8400-f2d54ad60f44" id="sec.291" provision.type="other" spent.amends="0"><no>291</no><heading guid="_7d2ada39-1cbf-4053-865e-ed4cbc5cc7ea" id="sec.291-he">Refusal of application</heading><block><txt break.before="1">If the chief executive decides to refuse the application, the chief executive must give the applicant an information notice for the decision.</txt></block></clause><clause affected.by.uncommenced="0" guid="_a44a927b-961d-4854-9583-89e0a280d391" id="sec.292" provision.type="other" spent.amends="0"><no>292</no><heading guid="_27c3baf0-f0f4-4c6e-8a90-c58a5b0ad0fa" id="sec.292-he">Cancellation of grant</heading><subclause affected.by.uncommenced="0" guid="_a882d42c-03a1-43b7-9b4d-d4ac7699ee87" id="sec.292-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the chief executive has granted a transition period exempt residue waste application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e45310d2-4e5b-4dd0-ae5d-74ea0ed0efe4" id="sec.292-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may cancel the grant of the application if the chief executive considers there are reasonable grounds to cancel it.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ac7d8e92-1648-4dcd-88f1-30b475c604fb" id="sec.292-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.292-ssec.2" target.guid="_e45310d2-4e5b-4dd0-ae5d-74ea0ed0efe4">subsection (2)</intref>, grounds may include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_136bceba-17f9-4467-9e07-87975f27596e" id="sec.292-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that there is a reasonable suspicion that the application was granted because of a false or misleading representation or declaration; or</txt></block></li><li guid="_2b8d6e08-3308-4acc-ba4d-598f065241a3" id="sec.292-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that the circumstances that were relevant to the granting of the application have changed; or</txt></block></li><li guid="_6c53a63a-6557-48f5-bdc4-ab9b88def57a" id="sec.292-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that the limits or conditions included in the granting of the application have not been complied with; or</txt></block></li><li guid="_228232f6-e25d-42d0-8bbd-22bcc156e964" id="sec.292-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">that it is desirable to cancel the grant having regard to the objects of the <legref check="valid" jurisd="QLD" target.doc.id="act-2011-031" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" type="act">Act</legref>.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d0315804-bfcf-4f0f-9486-4a6fd3f0d509" id="sec.293" provision.type="other" spent.amends="0"><no>293</no><heading guid="_2b5a2f09-57ea-4d1a-be2d-4bc269235ee6" id="sec.293-he">Procedure for cancelling grant of transition period exempt waste application</heading><subclause affected.by.uncommenced="0" guid="_62a307e1-e381-4fb1-b101-036c2cd94213" id="sec.293-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the chief executive proposes to cancel the grant of a transition period exempt residue waste application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c29cf86c-7bf5-49e5-9ad6-9c95a55a7cd6" id="sec.293-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive must give notice to the holder of the grant.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f4ece44e-18b6-4761-a6b1-4d75bbae4a83" id="sec.293-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The notice must state the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_233f9929-87a0-436b-a24f-9114d412a8ec" id="sec.293-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that the chief executive proposes to cancel the grant of the application;</txt></block></li><li guid="_a030daea-9cd9-4ac7-b2bb-0b67e74c7553" id="sec.293-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the grounds for the proposed cancellation;</txt></block></li><li guid="_997d5c8e-c76e-45e3-a2f9-8d4e55c1bfbc" id="sec.293-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the facts and circumstances that form the basis for the grounds;</txt></block></li><li guid="_037722b8-0924-4551-8c33-6a6e801072d4" id="sec.293-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">when the proposed cancellation is intended to take effect;</txt></block></li><li guid="_fcf251ab-431d-41da-a825-5ccffbe07ab5" id="sec.293-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">that the holder may make, within a stated period, written submissions to show why the proposed cancellation should not be taken.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7e53440a-7019-4ba4-b356-01c6613b1107" id="sec.293-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The stated period must end at least 15 business days after the holder is given the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_06ce20e8-31d8-4c7a-987e-a7e49390230c" id="sec.293-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The chief executive must consider any submissions made under <intref check="valid" refid="sec.293-ssec.3" target.guid="_f4ece44e-18b6-4761-a6b1-4d75bbae4a83">subsection (3)</intref><intref check="valid" refid="sec.293-ssec.3-para1.e" target.guid="_fcf251ab-431d-41da-a825-5ccffbe07ab5">(e)</intref> within the stated period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_513a608d-1363-456e-96ea-0c394c8a754e" id="sec.293-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">If the chief executive decides to cancel the grant of the application, the chief executive must, within 10 business days after making the decision give the holder of the grant an information notice for the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_eaeb0f3a-8a7d-49d6-b850-00ee91325aef" id="sec.293-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">The decision takes effect when the information notice is given.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7e63197d-8be1-4919-9606-07282da6010b" id="sec.294" provision.type="other" spent.amends="0"><no>294</no><heading guid="_90bf33f2-772e-4c8d-ba4e-9efcc84ad25b" id="sec.294-he">Automatic cancellation of grant</heading><block><txt break.before="1">The grant of a transition period exempt residue waste application is automatically cancelled if the business of conducting a recycling activity that was relevant to the application ceases to be in the grant holder’s ownership, including, for example, because the business is transferred into the ownership of another entity.</txt></block></clause></part><part affected.by.uncommenced="0" guid="_1e88a397-4333-416b-9adb-8e4ac967f6bd" id="ch.15-pt.4"><no>Part 4</no><heading guid="_8a9438f3-7cf4-4be3-b8cc-b3bb027bb6d4" id="ch.15-pt.4-he">General provisions</heading><clause affected.by.uncommenced="0" guid="_a7d5b2b3-3f01-4eeb-89e2-48480e906f8c" id="sec.295" provision.type="other" spent.amends="0"><no>295</no><heading guid="_92b0b71e-d768-4351-be73-2232022bc590" id="sec.295-he">Existing waste management strategy and business plan</heading><subclause affected.by.uncommenced="0" guid="_4c34417d-9fb4-40ae-aea0-21e82e2b8370" id="sec.295-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The document in existence as a document of the department immediately before the commencement of this section and known as Queensland’s Waste Reduction and Recycling Strategy 2010–2020—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8c061a5a-5154-4271-ab88-3405f9cf0759" id="sec.295-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is taken to be the State’s first waste management strategy under this Act; and</txt></block></li><li guid="_d0d7f677-e801-4e30-a4bd-6be8366280dc" id="sec.295-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">has effect as if it had been made under this Act on the commencement of this section.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0aba7bbb-60c7-4835-ba2f-992416ee4f52" id="sec.295-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The document in existence as a document of the department immediately before the commencement of this section and known as the Business Plan for Queensland’s Waste Reduction and Recycling Strategy 2010–2020—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e50e9be5-ff29-4a71-a857-fe3d73843ff1" id="sec.295-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is taken to be the State’s first WMS business plan under this Act; and</txt></block></li><li guid="_08da1619-50a5-49ae-bbe9-ce8390453916" id="sec.295-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">has effect as if it had been made under this Act on the commencement of this section.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2970feac-036a-4a80-a995-8db03dc96951" id="sec.296" provision.type="other" spent.amends="0"><no>296</no><heading guid="_722db461-f0fe-4593-b1e5-1a340f33c768" id="sec.296-he">Volumetric survey of levyable waste disposal site before waste levy commencement</heading><subclause affected.by.uncommenced="0" guid="_da4d7569-5357-43b8-81c5-a51525759cdd" id="sec.296-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a levyable waste disposal site located within the waste levy zone must, in compliance with the requirements stated in this section—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_06000463-f248-4db9-9116-1c2839b9332d" id="sec.296-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">within the period of 14 days immediately preceding 1 December 2011, ensure that a volumetric survey is carried out for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e83180ae-b16a-49f3-b3fc-000c5eb676be" id="sec.296-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">each active landfill cell at the site; and</txt></block></li><li guid="_4eebefcf-4b27-444c-a003-ee57105cca52" id="sec.296-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">all stockpiled waste at the site; and</txt></block></li></list></block></li><li guid="_a0e5c8d9-50bd-47a8-9611-f07b696ad3e9" id="sec.296-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">before the end December 2011, give the chief executive a copy of the results of the survey in the approved form.</txt></block></li></list></block><penalty guid="_30588d85-ec52-4dd2-8365-e6f0547e9e3e" id="sec.296-ssec.1-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_eadf5d5b-1ed6-45c0-be9e-e52e020fd15c" id="sec.296-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The volumetric survey must be performed in compliance with the requirements prescribed under a regulation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_72e1239a-be7c-4b2f-bf0e-84fa2809221b" id="sec.296-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The results of the volumetric survey must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_007a26ab-6c7c-4d21-a3e8-280246fb3158" id="sec.296-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in electronic form; and</txt></block></li><li guid="_97b7de81-17db-4d5f-a5f4-60f8b314e1c2" id="sec.296-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">include a topographical plan complying with specifications advised by the chief executive; and</txt></block></li><li guid="_957c0f5a-1e98-4b27-81bf-abfb5fd87010" id="sec.296-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">include advice of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5e3b42d0-ebbf-4721-9223-9a595c7abd81" id="sec.296-ssec.3-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the area of the levyable waste disposal site;</txt></block></li><li guid="_2a0e0804-fbe5-450a-92b3-2f33ad08f935" id="sec.296-ssec.3-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the site’s landfill capacity;</txt></block></li><li guid="_283ec962-af7f-46c5-b564-dc72f942e760" id="sec.296-ssec.3-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the stockpiles of waste on the site; and</txt></block></li></list></block></li><li guid="_0e394987-e584-4a85-a326-1a4c56e111d1" id="sec.296-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">be certified as accurate by a surveyor under the <legref check="valid" jurisd="QLD" target.doc.id="act-2003-070" target.version.series="58bf4472-9a2d-4809-9f04-c4ff625373da" type="act"><name emphasis="yes">Surveyors Act 2003</name></legref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a17dd305-165f-4dc9-91f1-e7c309413540" id="sec.296-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The operator of the levyable waste disposal site must ensure that a copy of the results of the volumetric survey is kept as a document in hard copy form at the levyable waste disposal site for 5 years after the survey is performed.</txt></block><penalty guid="_ae931a95-b9f6-4740-a83e-41c1e9234a45" id="sec.296-ssec.4-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_7a062233-52e3-4b51-8476-6bd24fb61991" id="sec.296-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0"><intref check="valid" refid="sec.296-ssec.6" target.guid="_3b1ae3dc-b5d1-4f69-9ea2-dd0b4d8ce007">Subsections (6)</intref> and <intref check="valid" refid="sec.296-ssec.7" target.guid="_faeed569-f4ea-44ba-9714-1f5f3fb85732">(7)</intref> apply if the operator of a levyable waste disposal site fails to comply with <intref check="valid" refid="sec.296-ssec.1" target.guid="_da4d7569-5357-43b8-81c5-a51525759cdd">subsection (1)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3b1ae3dc-b5d1-4f69-9ea2-dd0b4d8ce007" id="sec.296-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The chief executive may arrange for the volumetric survey to be carried out at the site and for that purpose may direct an authorised person to enter the site and carry out the survey.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_faeed569-f4ea-44ba-9714-1f5f3fb85732" id="sec.296-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">The chief executive may recover the cost of the survey from the operator as a debt payable by the operator to the State.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_5a1287c5-825b-4b8f-9c1a-a5b525df7532" id="sec.297" provision.type="other" spent.amends="0"><no>297</no><heading guid="_8c81853a-b2a9-4715-8ab3-9db1cf458144" id="sec.297-he">Volumetric survey of resource recovery area before waste levy commencement</heading><subclause affected.by.uncommenced="0" guid="_9e14f4a7-817f-48e0-92cd-173cdb03bd3f" id="sec.297-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The entity having responsibility for the operation of a resource recovery area must, in compliance with the requirements stated in this section—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e817248c-4a19-42b5-8b32-71153dd92200" id="sec.297-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">within the period of 14 days immediately preceding 1 December 2011, ensure that a volumetric survey is carried out for all stockpiled waste on the area; and</txt></block></li><li guid="_854639c9-f430-451d-8a48-c0dc88e483a2" id="sec.297-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">before the end December 2011, give the chief executive a copy of the results of the survey in the approved form.</txt></block></li></list></block><penalty guid="_fb67637c-6e3c-438a-9deb-c40d1419ea1b" id="sec.297-ssec.1-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_96f0b405-ef5d-4386-ad8f-abf51f9974c6" id="sec.297-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The volumetric survey must be performed in compliance with the requirements prescribed under a regulation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7be91a28-a87a-430a-bf10-5a18332cdaa5" id="sec.297-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The results of the volumetric survey must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_302b74d8-d7a2-4b99-95dd-4c2ec31767aa" id="sec.297-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in electronic form; and</txt></block></li><li guid="_dcf117ba-cc9b-4dd6-b766-231a78de3e31" id="sec.297-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">include a topographical plan complying with specifications advised by the chief executive; and</txt></block></li><li guid="_8147ce91-c65b-4360-b709-244477aae5a3" id="sec.297-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">include advice of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_844b3cbe-674e-4aca-a922-181b4d8e55e5" id="sec.297-ssec.3-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the area of the resource recovery area;</txt></block></li><li guid="_a566a291-52a4-4234-95dc-155db4278ec0" id="sec.297-ssec.3-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the stockpiles of waste on the area; and</txt></block></li></list></block></li><li guid="_87c984a7-83fe-40a2-a7ef-62c912520c7a" id="sec.297-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">be certified as accurate by a surveyor under the <legref check="valid" jurisd="QLD" target.doc.id="act-2003-070" target.version.series="58bf4472-9a2d-4809-9f04-c4ff625373da" type="act"><name emphasis="yes">Surveyors Act 2003</name></legref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7a51420d-98af-46db-b056-8b2433a76369" id="sec.297-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The entity having responsibility for a resource recovery area must ensure that a copy of the results of the volumetric survey is kept as a document in hard copy form at the levyable waste disposal site whose operator declared the resource recovery area for 5 years after the survey is performed.</txt></block><penalty guid="_ca531459-50ad-476c-b976-60e05922af3b" id="sec.297-ssec.4-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_9f9f0f2a-67fc-4427-8fc6-c9b0cb754b04" id="sec.297-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0"><intref check="valid" refid="sec.297-ssec.6" target.guid="_73f69f93-c424-4069-8e15-979acbc6ce1b">Subsections (6)</intref> and <intref check="valid" refid="sec.297-ssec.7" target.guid="_e572cba0-1ded-4363-aef0-424d93a8d485">(7)</intref> apply if the entity having responsibility for a resource recovery area fails to comply with <intref check="valid" refid="sec.297-ssec.1" target.guid="_9e14f4a7-817f-48e0-92cd-173cdb03bd3f">subsection (1)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_73f69f93-c424-4069-8e15-979acbc6ce1b" id="sec.297-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The chief executive may arrange for the volumetric survey to be carried out at the resource recovery area and for that purpose may direct an authorised person to enter the resource recovery area and carry out the survey.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e572cba0-1ded-4363-aef0-424d93a8d485" id="sec.297-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">The chief executive may recover the cost of the survey from the entity as a debt payable by the entity to the State.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c30a0822-0d5e-4e69-b266-b657a92dd55c" id="sec.298" provision.type="other" spent.amends="0"><no>298</no><heading guid="_f14f4ee2-5e76-408c-b8b5-b494ebd1bb7e" id="sec.298-he">Temporary relaxation from <intref check="valid" refid="sec.45" target.guid="_a82da1dd-ba24-4d90-a2d1-32190b3bd74c">s 45</intref><intref check="valid" refid="sec.45-ssec.2" target.guid="_81f71b8f-ff2f-462c-903d-4e6a94f29ae5">(2)</intref> requirements for small site</heading><block><txt break.before="1">Until 30 June 2014, the operator of a small site is not required to comply with the requirement of <intref check="valid" refid="sec.45" target.guid="_a82da1dd-ba24-4d90-a2d1-32190b3bd74c">section 45</intref><intref check="valid" refid="sec.45-ssec.2" target.guid="_81f71b8f-ff2f-462c-903d-4e6a94f29ae5">(2)</intref> to measure and record waste in compliance with the weight measurement criteria prescribed under a regulation if all of the following apply—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_21dae0a6-6f26-4f16-b012-486b830a5c03" id="sec.298-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the operator has, before 1 December 2011, notified the chief executive of a proposed alternative methodology for measuring and recording waste at the site;</txt></block></li><li guid="_98456c8e-0a1a-4f68-8bf8-0a80b5871a3b" id="sec.298-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the notification to the chief executive identifies the small site and includes details of the proposed alternative methodology;</txt></block></li><li guid="_9a46f425-38cd-4650-bef8-c21bf5d7e4bf" id="sec.298-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the proposed alternative methodology enables the operator to fairly calculate the total waste levy amount owing to the chief executive on waste delivered, or moved from stockpile to landfill, at the site;</txt></block></li><li guid="_8c2fa0d7-b229-4866-b262-c91614fbfb0d" id="sec.298-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the operator is implementing the alternative methodology in accordance with its terms.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_c7f5fe0f-a38f-4119-9aa1-c891dbd4b35c" id="sec.299" provision.type="other" spent.amends="0"><no>299</no><heading guid="_eba3b021-d2d6-4c22-baa8-a42d9c7415e9" id="sec.299-he">Offences against repealed littering provisions</heading><subclause affected.by.uncommenced="0" guid="_25827529-5bec-4529-ab1f-8da8e92fd58e" id="sec.299-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Proceedings for an offence against any of the repealed littering provisions may be continued or started, and the provisions of the Environmental Protection Act and the <legref check="valid" jurisd="QLD" target.doc.id="act-1999-070" target.version.series="98b1c6c5-4112-4f50-bf2f-c03eb0a343e4" type="act"><name emphasis="yes">State Penalties Enforcement Act 1999</name></legref> necessary or convenient to be used in relation to the proceedings continue to apply, as if this Act had not been enacted.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_670b7ddb-b965-4716-b8f1-c8ce5a5d1843" id="sec.299-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.299-ssec.1" target.guid="_25827529-5bec-4529-ab1f-8da8e92fd58e">subsection (1)</intref>, the <legref check="valid" jurisd="QLD" target.doc.id="act-1954-003" target.version.series="3cfb010e-ce09-4afd-baf6-bd10d22741a7" type="act"><name emphasis="yes">Acts Interpretation Act 1954</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.20" target.doc.id="act-1954-003" target.guid="_c17d849c-f09e-4b5c-8f88-21070166e68b" target.version.series="3cfb010e-ce09-4afd-baf6-bd10d22741a7" type="act">section 20</legref>, applies, but does not limit the subsection.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b89a8273-763a-465f-aa9c-867d1f13b309" id="sec.300" provision.type="other" spent.amends="0"><no>300</no><heading guid="_da9cec6d-f4e9-4677-85c6-65ee9daf1289" id="sec.300-he">Existing strategic plans under repealed waste management policy</heading><subclause affected.by.uncommenced="0" guid="_e0bd09ec-5210-4aa2-a16c-d83782b8a41c" id="sec.300-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">For 1 year after the commencement of this section, <intref check="invalid" refid="pt.7">part 7</intref>, <intref check="invalid" refid="pt.7-div.1">division 1</intref> of the repealed waste management policy, and any waste management strategic plan in force for a local government area under the repealed policy, continues to have effect as if this Act had not been enacted.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ec2557b2-c833-438d-9182-ffc1c7603ba7" id="sec.300-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.300-ssec.1" target.guid="_e0bd09ec-5210-4aa2-a16c-d83782b8a41c">Subsection (1)</intref> has effect in a local government area other than in relation to any aspect of waste management in the local government area that is the subject of a waste reduction and recycling plan that comes into force under this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a1d4b92f-0ffd-41e1-8551-36fa607948ae" id="sec.300-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For 1 year after the commencement of this section, <intref check="invalid" refid="pt.7">part 7</intref>, <intref check="invalid" refid="pt.7-div.2">division 2</intref> of the repealed waste management policy, and any strategic plan for managing a department’s waste in force for a department under the repealed policy, continues to have effect as if this Act had not been enacted.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_369cfa74-f543-4469-b3f2-8d7f7020dca8" id="sec.300-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0"><intref check="valid" refid="sec.300-ssec.3" target.guid="_a1d4b92f-0ffd-41e1-8551-36fa607948ae">Subsection (3)</intref> has effect for a department other than in relation to any aspect of waste management for the department that is the subject of a waste reduction and recycling plan that comes into force under this Act.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0ef127da-dbbc-47d6-b77b-22405df3f019" id="sec.301" provision.type="other" spent.amends="0"><no>301</no><heading guid="_1c9432cf-c4da-4901-92ba-56cc196483f5" id="sec.301-he">Clinical and related waste management plan</heading><subclause affected.by.uncommenced="0" guid="_29a10d3c-6ca1-4e19-9e68-dd1aed61ef98" id="sec.301-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_284d0cff-d9dd-4a8e-ba1f-1f812649fc69" id="sec.301-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">immediately before the commencement of this section, there was in force for an entity a clinical and related waste management plan (the <defterm guid="_0c975884-0aef-444b-87e9-0d8cd1706aa6" id="sec.301-ssec.1-def.clinicalplan" type="definition">clinical plan</defterm>) under the <legref check="valid" jurisd="QLD" target.doc.id="sl-2000-0178" target.version.series="f7154fab-7553-48a9-8cc4-ca5d18bf7e1c" type="subordleg"><name emphasis="yes">Environmental Protection (Waste Management) Regulation 2000</name></legref>, <legref check="invalid" jurisd="QLD" refid="pt.5" target.doc.id="sl-2000-0178" target.version.series="f7154fab-7553-48a9-8cc4-ca5d18bf7e1c" type="subordleg">part 5</legref>, <legref check="invalid" jurisd="QLD" refid="pt.5-div.1" target.doc.id="sl-2000-0178" target.version.series="f7154fab-7553-48a9-8cc4-ca5d18bf7e1c" type="subordleg">division 1</legref>; and</txt></block></li><li guid="_0a38a1d7-7a3f-4e39-a018-2f7003b5e84c" id="sec.301-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the entity is a planning entity under this Act.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_039753d8-7dfb-41b9-a9ce-0829d18fe653" id="sec.301-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Unless the entity sooner adopts a waste reduction and recycling plan under this Act, the clinical plan has effect as a waste reduction and recycling plan for the entity as if it had been adopted by the entity in compliance with this Act.</txt></block></subclause></clause></part></chapter><chapter affected.by.uncommenced="0" guid="_4becd91c-6afc-4a56-af32-adc6dcbbec73" id="ch.15A"><no>Chapter 15A</no><heading guid="_c0b3b265-1de5-4dd8-b263-48f5ed85960c" id="ch.15A-he">Validation and transitional provisions for <legref check="valid" jurisd="QLD" target.doc.id="act-2013-006" target.version.series="79e37f15-e459-4954-acfd-c47db85cac17" type="act"><name emphasis="no">Waste Reduction and Recycling and Other Legislation Amendment Act 2013</name></legref></heading><part affected.by.uncommenced="0" guid="_fe83e938-d405-4f4d-82cf-327f64440d15" id="ch.15A-pt.1"><no>Part 1</no><heading guid="_10e82a3e-0054-49ed-86ab-11c4abb625b2" id="ch.15A-pt.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_eec2037b-21a0-4e24-9d3c-78dc647a4b36" id="sec.301A" provision.type="transitional" spent.amends="0"><no>301A</no><heading guid="_e01a3126-7f84-4bbd-b83e-94ce6943f3fd" id="sec.301A-he">Definitions for ch 15A</heading><block><txt break.before="1">In this chapter—</txt><deflist><definition affected.by.uncommenced="0" guid="_a453b90a-6bc5-4c61-818a-73df67f9a39a" id="sec.301A-def.commencement_"><txt break.before="1"><defterm guid="_5dc946dd-3149-4f4a-a2ec-f94d5879d6a0" id="sec.301A-def.commencement" type="definition">commencement</defterm> means the commencement of this section.</txt></definition><definition affected.by.uncommenced="0" guid="_0c46d6bd-e881-449d-a248-f528d3b81505" id="sec.301A-def.levyablewastedisposalsite_"><txt break.before="1"><defterm guid="_49ae6bf0-a2f8-4084-93d8-447e7a364ae7" id="sec.301A-def.levyablewastedisposalsite" type="definition">levyable waste disposal site</defterm> means a levyable waste disposal site under the unamended Act, section 27.</txt></definition><definition affected.by.uncommenced="0" guid="_f0bdc55e-0ce4-448a-bcd5-a1cdfa1e0955" id="sec.301A-def.resourcerecoveryarea_"><txt break.before="1"><defterm guid="_c6a6dd9d-940c-48a4-b1fb-acda18c78fbc" id="sec.301A-def.resourcerecoveryarea" type="definition">resource recovery area</defterm> means a resource recovery area under the unamended Act, section 61.</txt></definition><definition affected.by.uncommenced="0" guid="_49f87a0e-9437-4be4-a042-8d45f34e229c" id="sec.301A-def.unamendedAct_"><txt break.before="1"><defterm guid="_99b9f97d-4abf-4ff8-99de-b4572befad69" id="sec.301A-def.unamendedAct" type="definition">unamended Act</defterm> means this Act as in force before the commencement.</txt></definition><definition affected.by.uncommenced="0" guid="_86598adf-3559-4cb4-9e16-eb9e4161f89a" id="sec.301A-def.WasteandEnvironmentFund_"><txt break.before="1"><defterm guid="_c92c916d-34cc-4de5-95ef-c66a80963dd2" id="sec.301A-def.WasteandEnvironmentFund" type="definition">Waste and Environment Fund</defterm> means the Waste and Environment Fund under the unamended Act, schedule.</txt></definition><definition affected.by.uncommenced="0" guid="_d5bf71fe-3bf0-4078-9646-56026592ef0f" id="sec.301A-def.wastelevy_"><txt break.before="1"><defterm guid="_29ca24cf-e3e7-4c47-8b90-3c5be170fbe5" id="sec.301A-def.wastelevy" type="definition">waste levy</defterm> means the waste levy under the unamended Act, section 37.</txt></definition><definition affected.by.uncommenced="0" guid="_4134f826-f097-47d4-a9fe-ef00c85153b3" id="sec.301A-def.wastelevyamount_"><txt break.before="1"><defterm guid="_1bffeed7-aeae-4f3c-93ca-b8f4b7de682f" id="sec.301A-def.wastelevyamount" type="definition">waste levy amount</defterm> means a waste levy amount under the unamended Act, section 26.</txt></definition></deflist></block></clause></part><part affected.by.uncommenced="0" guid="_4546f384-8c50-4e12-9178-b80eb60271cf" id="ch.15A-pt.2"><no>Part 2</no><heading guid="_382079a7-7eff-4d8a-b3b8-f30e8c1ffc39" id="ch.15A-pt.2-he">Validation provision</heading><clause affected.by.uncommenced="0" guid="_bdfed416-a11d-4eed-b6c4-b62bfc559929" id="sec.301B" provision.type="transitional" spent.amends="0"><no>301B</no><heading guid="_8d3a2828-4c25-4646-8c59-5a292485a559" id="sec.301B-he">Validation of repeal of waste levy on 1 July 2012</heading><subclause affected.by.uncommenced="0" guid="_811f060a-56e8-471b-995f-e4ef8d52c0dd" id="sec.301B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">It is declared that the amendments made by the <legref check="valid" jurisd="QLD" target.doc.id="sl-2012-0077" target.version.series="45a90871-bab6-4626-a191-54379b263338" type="subordleg"><name emphasis="yes">Waste Reduction and Recycling Amendment Regulation (No. 1) 2012</name></legref> to repeal the waste levy on 1 July 2012 are taken to be, and to always been, as valid as they would have been if the amendments had been made by this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6aa848df-de76-4614-bde1-5629e85763af" id="sec.301B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite anything else in this Act or any regulation made under this Act, for the period starting on 1 July 2012 and ending on the commencement of this section, no waste levy is or was payable by the operator of a levyable waste disposal site in relation to any type of waste.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_ca9cfc60-3213-4805-b8c7-fda9fb966f3b" id="ch.15A-pt.3"><no>Part 3</no><heading guid="_35effa5c-abf6-4f49-9f34-41265940fa81" id="ch.15A-pt.3-he">Transitional provisions</heading><clause affected.by.uncommenced="0" guid="_93e82595-643e-4e29-96d4-f29c16b524b7" id="sec.301C" provision.type="transitional" spent.amends="0"><no>301C</no><heading guid="_98aaf917-b4a3-4340-9a5b-5fbb0ba5c6ea" id="sec.301C-he">Operator of levyable waste disposal site to keep documents</heading><block><txt break.before="1">Section 53, as in force immediately before the commencement, continues to apply, after the commencement, to a person who was an operator of a levyable waste disposal site before the commencement in relation to the keeping of documents mentioned in the section.</txt></block></clause><clause affected.by.uncommenced="0" guid="_f8344c46-f4b7-4c30-9513-40493b44bcf4" id="sec.301D" provision.type="transitional" spent.amends="0"><no>301D</no><heading guid="_48242108-8115-429b-8a4a-36cb60fb7a76" id="sec.301D-he">Estimation of waste levy amount payable</heading><subclause affected.by.uncommenced="0" guid="_4923ac28-1adb-49c6-b29a-733f4303f868" id="sec.301D-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may take action or continue to take action under section 60, as in force immediately before the commencement—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5c135cb0-d9f5-4e9f-a0f9-80a4d39ab3e2" id="sec.301D-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the circumstances mentioned in section 60(1) in relation to the payment of the waste levy and the calculation of the waste levy amount payable by the operator of a levyable waste disposal site for a particular period apply; and</txt></block></li><li guid="_04cecea4-b5bf-45dc-a928-2c53bf38468c" id="sec.301D-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">despite the repeal of section 60.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1bcc2b6c-c6c2-4afb-ac9a-526cb57e6d4a" id="sec.301D-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Subsection (1) applies until 1 July 2018.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f6c74cfc-b561-42d8-bb9d-691f686cb0b8" id="sec.301E" provision.type="transitional" spent.amends="0"><no>301E</no><heading guid="_b9e12196-9479-4562-b350-29ef14358874" id="sec.301E-he">Keeping of particular documents in relation to resource recovery areas</heading><block><txt break.before="1">Despite the repeal of section 65, an entity having responsibility for the operation of a resource recovery area before the commencement must keep the following documents relating to the area for at least 5 years after the happening of the event recorded—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0b3dd39f-5b4c-4edf-880c-e0a996e0f508" id="sec.301E-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">any document that records waste delivered to the area, including its measurements;</txt></block></li><li guid="_b1804929-c325-4142-9c98-1bb21c7beea9" id="sec.301E-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any document that records waste removed from the area, including its destination and its measurements;</txt></block></li><li guid="_2a980585-dd20-42ea-8300-f853007bcf04" id="sec.301E-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">any document that records any other event for the area as prescribed under a regulation.</txt></block></li></list></block><penalty guid="_cbec14ac-0d24-4f2b-935e-0cd21d1a4883" id="sec.301E-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></clause><clause affected.by.uncommenced="0" guid="_77e2f247-aab4-4f3d-b2e0-558669574f86" id="sec.301F" provision.type="transitional" spent.amends="0"><no>301F</no><heading guid="_574759f6-8d11-4bf0-abd1-86de1be2339c" id="sec.301F-he">Keeping of results of volumetric survey for resource recovery area</heading><block><txt break.before="1">Despite the repeal of section 66, the entity having responsibility for a resource recovery area before the commencement must ensure that a copy of the results of any volumetric survey performed under that section for the area is kept as a document in hard copy or electronic form, at the site whose operator made the declaration of the area as a resource recovery area, for 5 years after the survey is performed.</txt></block><penalty guid="_21963b3c-b815-4e7a-bb3b-349bb44b1ebc" id="sec.301F-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></clause><clause affected.by.uncommenced="0" guid="_6e4249a5-5e1f-4e29-94f3-aebf7250bc83" id="sec.301G" provision.type="transitional" spent.amends="0"><no>301G</no><heading guid="_99eb9382-ca12-4f1c-b488-d425ba44119e" id="sec.301G-he">Waste levy amounts and the Waste and Environment Fund</heading><subclause affected.by.uncommenced="0" guid="_57bb64ec-6b40-4586-98cb-c8bb216e3335" id="sec.301G-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Any transactions in relation to waste levy amounts that, before the commencement, would have been managed through the Waste and Environment Fund are to be managed after the commencement through the departmental accounts of the department.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fe6ad9db-777b-4add-a819-cb0a31ebee67" id="sec.301G-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_92e7ac53-7c2f-4412-b9cd-d721d8e84db0" id="sec.301G-ssec.2-def.departmentalaccounts_"><txt break.before="1"><defterm guid="_26b5973e-19aa-4b03-af68-65de9028d0ca" id="sec.301G-ssec.2-def.departmentalaccounts" type="definition">departmental accounts</defterm>, of the department, means the accounts of the department under the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-009" target.version.series="3bbc6476-dce9-45a6-a821-229426b13686" type="act"><name emphasis="yes">Financial Accountability Act 2009</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.69" target.doc.id="act-2009-009" target.guid="_a3d35038-81d0-4eeb-bdfa-18499d53d5ae" target.version.series="3bbc6476-dce9-45a6-a821-229426b13686" type="act">section 69</legref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_25fcff60-3451-472e-82c4-dfbcfeb76760" id="sec.301H" provision.type="transitional" spent.amends="0"><no>301H</no><heading guid="_182d158c-c419-4225-b9d8-0a2a6fdbaa6d" id="sec.301H-he">Discounted levy and waste levy exemption</heading><block><txt break.before="1">Chapter 15, parts 2 and 3 are taken to have had effect only until 30 June 2012.</txt></block></clause><clause affected.by.uncommenced="0" guid="_b869a5f8-e2db-43ce-bd79-0bc34841d900" id="sec.301I" provision.type="transitional" spent.amends="0"><no>301I</no><heading guid="_4d408721-0c57-4e12-8089-ea5e795db0cf" id="sec.301I-he">Existing strategic plans under repealed waste management policy</heading><subclause affected.by.uncommenced="0" guid="_eef6530a-cd82-4f4c-b4de-3f4225e27da2" id="sec.301I-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies despite section 300.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d7bcf1b4-63ec-44f4-9436-6c84258a15fb" id="sec.301I-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Section 300(1) and (2) continues in effect until a waste reduction and recycling plan under section 123 is adopted by the local government.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f97c8448-5fc9-42aa-a76b-7cc59515706d" id="sec.301I-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Section 300(3) and (4) continues in effect until a waste reduction and recycling plan under section 133 is adopted by the chief executive officer of a State entity.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2f887be2-e749-48d5-9ed6-a63e218bdf95" id="sec.301J" provision.type="transitional" spent.amends="0"><no>301J</no><heading guid="_0b384372-985f-4d28-ac16-ed093a3247ae" id="sec.301J-he">Clinical and related waste management plans</heading><block><txt break.before="1">Despite section 301(2), the planning entity to which section 301 applies must, by the day prescribed under a regulation, have a new waste reduction and recycling plan that complies with chapter 6.</txt></block></clause></part></chapter><chapter affected.by.uncommenced="0" guid="_542c15e9-1dcd-4dcf-b2de-64676d3964ab" id="ch.16"><no>Chapter 16</no><heading guid="_4d5e9ace-2377-4936-a66c-754004f4dcc8" id="ch.16-he">Other transitional provisions</heading><part affected.by.uncommenced="0" guid="_a8f15e4a-491f-4d69-803a-4003792ffe3d" id="ch.16-pt.1"><no>Part 1</no><heading guid="_06cf22bd-f7a2-4189-8276-03359989cf50" id="ch.16-pt.1-he">Transitional provisions for <legref check="valid" jurisd="QLD" target.doc.id="act-2014-059" target.version.series="204c0f58-f151-405c-adfd-ee909626de3b" type="act"><name emphasis="no">Environmental Protection and Other Legislation Amendment Act 2014</name></legref></heading><clause affected.by.uncommenced="0" guid="_33f52e43-dde4-4331-b87b-cb9c86a7ab2f" id="sec.302" provision.type="transitional" spent.amends="0"><no>302</no><heading guid="_e9c2284b-0d31-4cb9-b9d3-27e090daeab1" id="sec.302-he">Definitions for ch 16</heading><block><txt break.before="1">In this chapter—</txt><deflist><definition affected.by.uncommenced="0" guid="_78fe0e7f-67d9-464b-96b5-1da207087480" id="sec.302-def.amendingAct_"><txt break.before="1"><defterm guid="_62d37609-3ce3-44f0-b58c-b64b9e3ff7f5" id="sec.302-def.amendingAct" type="definition">amending Act</defterm> means the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-059" target.version.series="204c0f58-f151-405c-adfd-ee909626de3b" type="act"><name emphasis="yes">Environmental Protection and Other Legislation Amendment Act 2014</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_4b04b24e-bfaf-4d96-8717-3bdcd9e12b4f" id="sec.302-def.formerAct_"><txt break.before="1"><defterm guid="_59447edb-bb33-4012-b4c0-774648f74b59" id="sec.302-def.formerAct" type="definition">former Act</defterm> means this Act as in force immediately before the commencement.</txt></definition><definition affected.by.uncommenced="0" guid="_6e30a397-b29d-4fcd-8a6b-493b80b0f4a5" id="sec.302-def.generalapproval_"><txt break.before="1"><defterm guid="_7e4fe479-edfd-4352-8b6d-532432934d02" id="sec.302-def.generalapproval" type="definition">general approval</defterm> means a general approval under the former Act.</txt></definition><definition affected.by.uncommenced="0" guid="_b25882cc-a71b-484f-b80c-be8b1e078ec6" id="sec.302-def.specificapproval_"><txt break.before="1"><defterm guid="_3f685cf8-ab4c-4273-a327-e69e077c6de2" id="sec.302-def.specificapproval" type="definition">specific approval</defterm> means a specific approval under the former Act.</txt></definition></deflist></block></clause><clause affected.by.uncommenced="0" guid="_fe302e72-3830-4f91-9770-2cc1b5595182" id="sec.303" provision.type="transitional" spent.amends="0"><no>303</no><heading guid="_48eafbd0-e39a-42a4-b8e8-3a86c047c8bf" id="sec.303-he">Existing general approvals</heading><subclause affected.by.uncommenced="0" guid="_7444e9a2-5d8e-4ba6-be14-a193ae4d0579" id="sec.303-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to a general approval that was in force immediately before the commencement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_68293f9f-db15-4b46-998f-596aff3df922" id="sec.303-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The general approval continues in force for its term provided for under the former Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_84573478-bc86-42b0-a61e-42e5e5b1f33b" id="sec.303-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Despite the replacement of chapter 8 under the amending Act, the following provisions as in force under the former Act continue to apply for the general approval—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_47728157-9ae9-49c9-87dc-7f67118a7fef" id="sec.303-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">chapter 8, part 5;</txt></block></li><li guid="_fc1543f1-732d-43bc-b5d5-a661a57f04f2" id="sec.303-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">chapter 8, part 6, division 2 to the extent it provides for the cancellation or suspension of an approval;</txt></block></li><li guid="_bc510b4c-3b5d-4209-87b5-aa15ad9b10ba" id="sec.303-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">chapters 9, 10, 11 and 14 to the extent they relate to a general approval.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_600ea92e-aeee-45ca-897f-0ab814fc58d1" id="sec.303-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Subsection (5) applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_daf26225-40f4-4128-a413-1fdcab3639e7" id="sec.303-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an end of waste code is made; and</txt></block></li><li guid="_0098245b-5e8e-4663-a205-a95663ebf8bf" id="sec.303-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the end of waste code relates to a particular waste or resource to which the general approval relates.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_cf783758-ba67-4846-9500-4cebcc4bd078" id="sec.303-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The general approval ends on the later of the following days—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dddd47fc-4e85-47ea-9c43-0cf90d79a795" id="sec.303-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the day before the end of waste code takes effect;</txt></block></li><li guid="_a152dee1-1c36-4e78-85fb-c64a54d89d8e" id="sec.303-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a later day fixed by the chief executive for that purpose by notice published on the department’s website.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d0e6c403-e1fe-4d2e-bd6c-0928e9079c2d" id="sec.303-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">A person who is registered under a general approval that ends is taken to be a registered resource producer from the day on which the approval ends.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ae8a723c-bb0f-4c3b-8e76-4c09ff8e23d6" id="sec.303-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">Section 158 does not apply to a person who was carrying out an activity in accordance with a general approval that ends until 1 year after the general approval ends.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_897fdef3-6fbf-4220-97c5-5acf8a599568" id="sec.303-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">However, subsection (3) continues to apply as if the general approval has not ended under subsection (5).</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_09720c64-4184-49e3-b35f-38adf16aed90" id="sec.304" provision.type="transitional" spent.amends="0"><no>304</no><heading guid="_22e65b76-0380-4f6d-889c-eb1b5af8c513" id="sec.304-he">Existing specific approvals</heading><subclause affected.by.uncommenced="0" guid="_95932e8d-d875-4cca-88dc-328efa5d316a" id="sec.304-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, immediately before the commencement, a person was the holder of a specific approval under the former Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6835beaa-564b-4574-9507-8bd38e02fcfc" id="sec.304-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite the replacement of chapter 8 under the amending Act, chapter 8, part 5 of the former Act continues to apply to the specific approval.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f80b8911-8e4d-4e81-aae6-ef82413c73e1" id="sec.304-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">From the commencement, the specific approval is taken to be an end of waste approval for the particular resource or waste to which the specific approval relates.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a894edb7-09fc-4b21-ba3f-d9d94e6bd522" id="sec.305" provision.type="transitional" spent.amends="0"><no>305</no><heading guid="_04fd8f5a-eae9-41f3-bc62-0b23536e79ba" id="sec.305-he">Existing applications</heading><subclause affected.by.uncommenced="0" guid="_d394d804-dc19-4706-a8c6-11ab046ce0e7" id="sec.305-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to any of the following applications made under the former Act but not decided before the commencement—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a0b63b66-4ff1-4734-aff9-910fbab22dc1" id="sec.305-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an application for a general approval or specific approval;</txt></block></li><li guid="_dccc16ba-61c8-4ee0-85d8-ae869ec3922a" id="sec.305-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an application for an amendment or transfer of a general approval or specific approval.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2aa2fa9b-2f34-4188-874f-fba40b4c2374" id="sec.305-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On the commencement, the application lapses.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_be8469f8-15cb-4dc8-9212-9e334bc960c2" id="sec.306" provision.type="transitional" spent.amends="0"><no>306</no><heading guid="_14a9359d-42f3-4163-bf5f-7bb40bcb287b" id="sec.306-he">Existing show cause procedure</heading><subclause affected.by.uncommenced="0" guid="_366e335e-3a41-46cf-aa93-c5786a2f6274" id="sec.306-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, before the commencement—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6634bf80-37be-4be8-a969-69011f9902dc" id="sec.306-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the chief executive gave a person operating under a general approval, or the holder of a specific approval, a show cause notice under the former Act, section 246; and</txt></block></li><li guid="_1a03e8c1-1241-4a1d-bce3-4992e59f8e0d" id="sec.306-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the chief executive had not decided whether or not to give the person a compliance notice.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0114662e-cd01-40c5-bfd8-f8afaa39b6aa" id="sec.306-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive must decide under the former Act whether or not to give the person a compliance notice.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_7f1dc6f9-4297-49a8-9d02-952b11b88ac1" id="ch.16-pt.2"><no>Part 2</no><heading guid="_afaed4bb-04ce-411f-b557-f03eee85b17b" id="ch.16-pt.2-he">Transitional provisions for <legref check="valid" jurisd="QLD" target.doc.id="act-2017-031" target.version.series="213b537b-c4e8-486b-9085-ea33103c0a65" type="act"><name emphasis="no">Waste Reduction and Recycling Amendment Act 2017</name></legref></heading><clause affected.by.uncommenced="0" guid="_a37adc32-a204-4317-8ad7-97564ea447db" id="sec.307" provision.type="transitional" spent.amends="0"><no>307</no><heading guid="_96abd96b-0f9c-45be-9a1d-a9cb43160a89" id="sec.307-he">Retailer must offer alternative shopping bag during phase out period</heading><subclause affected.by.uncommenced="0" guid="_85f49366-79dd-41af-b2d8-22da9c71d886" id="sec.307-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, during the phase out period, a person asks a retailer for an alternative shopping bag to use to carry goods that the retailer sells from the retailer’s premises.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_eb4915a5-2d66-4a95-b762-5164977a1f5a" id="sec.307-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The retailer must offer to give or sell the person an alternative shopping bag.</txt><penalty guid="_50acc88b-07c6-440d-aa05-a6be6b95ff20" id="sec.307-ssec.2-pen"><block><txt break.before="1">Maximum penalty—50 penalty units.</txt></block></penalty></block></subclause><subclause affected.by.uncommenced="0" guid="_067b097f-adac-4b2a-ad49-f8b6e8c3d157" id="sec.307-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_030e3a7f-980f-40ee-b530-3ae5320d8f6f" id="sec.307-ssec.3-def.phaseoutperiod_"><txt break.before="1"><defterm guid="_4bcbba89-2bda-400b-96ee-45f4ad797b00" id="sec.307-ssec.3-def.phaseoutperiod" type="definition">phase out period</defterm> means the period that starts on the commencement and ends on 30 June 2018.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_31be79f8-f731-40eb-8121-1e8ce4981e1b" id="sec.308" provision.type="transitional" spent.amends="0"><no>308</no><heading guid="_e7b0b171-920f-4488-9b7e-c26537d1741b" id="sec.308-he">Transition period for displaying refund marking on beverage containers</heading><subclause affected.by.uncommenced="0" guid="_1f44c197-76dc-46ec-bf33-e94bafd3fae1" id="sec.308-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A manufacturer of a beverage product does not commit an offence against section 99P(2) if, before the manufacture transition day, the manufacturer sells a beverage product in a container that does not display the refund marking.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_243edd82-cc32-4cc2-84f8-b8fa7c3a4dd2" id="sec.308-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Also, a person does not commit an offence against a provision of chapter 4, part 3B if, before the collection transition day, the person does any of the following things in relation to a container that does not display the refund marking—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9c99575f-9dda-4939-9a74-ffc7e2dd8ab2" id="sec.308-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">claims a refund amount for the container at a container refund point, including a reverse vending machine;</txt></block></li><li guid="_918f3a0d-3b6c-433a-aea5-7891fcd8d144" id="sec.308-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">accepts the container and pays a refund amount for the container;</txt></block></li><li guid="_78bb8469-2195-470b-af89-79ecd714ee72" id="sec.308-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">allows a reverse vending machine to accept the container and dispense a refund amount for the container;</txt></block></li><li guid="_5125a4bf-f7ce-4be3-9dd1-5b65176199d6" id="sec.308-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">claims a recovery amount for the container from the Organisation;</txt></block></li><li guid="_b8f36822-8510-44c5-b0a3-a59c46d7b3ae" id="sec.308-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">makes a declaration in an approved form about the container displaying a refund marking.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_966539af-4ada-4ca8-b0d2-0cdb57171f90" id="sec.308-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_667db7f9-29f6-47c6-be01-6c74a202586d" id="sec.308-ssec.3-def.collectiontransitionday_"><txt break.before="1"><defterm guid="_ee888110-7996-4434-8c9d-4f5544f85a9b" id="sec.308-ssec.3-def.collectiontransitionday" type="definition">collection transition day</defterm> means the day that is 6 months after the manufacture transition day.</txt></definition><definition affected.by.uncommenced="0" guid="_5012c27f-3f89-491c-ab4b-de9abe50f62a" id="sec.308-ssec.3-def.manufacturetransitionday_"><txt break.before="1"><defterm guid="_61008d95-7d43-4970-8ca2-9b8c756f7249" id="sec.308-ssec.3-def.manufacturetransitionday" type="definition">manufacture transition day</defterm> means the day, prescribed by regulation, that is at least 1 year after the day a regulation prescribing the requirements for the refund marking made under section 99K, definition <defterm guid="_c792031a-05a3-410b-9011-bd190897818f" type="mention">refund marking</defterm> commences.</txt></definition></deflist></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_033f6b4c-1960-4538-9459-51cef67151ae" id="ch.16-pt.3"><no>Part 3</no><heading guid="_97fab41c-16cd-4932-bf81-68fbad491a0f" id="ch.16-pt.3-he">Transitional provisions for <legref check="valid" jurisd="QLD" target.doc.id="act-2019-002" target.version.series="f39804ab-11aa-4a41-a37e-6bb873c22a83" type="act"><name emphasis="no">Waste Reduction and Recycling (Waste Levy) Amendment Act 2019</name></legref></heading><division affected.by.uncommenced="0" guid="_c187e9a2-9780-4cfb-a021-f9869292b355" id="ch.16-pt.3-div.1"><no>Division 1</no><heading guid="_dbca4aed-8dab-494b-a870-e4ff5f119f12" id="ch.16-pt.3-div.1-he">Exemption from waste levy for particular residue waste during transition period</heading><clause affected.by.uncommenced="0" guid="_9cc5a311-228e-4c91-8806-be39c78f072c" id="sec.309" provision.type="transitional" spent.amends="0"><no>309</no><heading guid="_4a4905ff-7d72-4c7b-b847-19562e31a2ed" id="sec.309-he">Definitions for division</heading><block><txt break.before="1">In this division—</txt><deflist><definition affected.by.uncommenced="0" guid="_8ed7aaf6-6a02-4163-abf5-2c0cc63a3841" id="sec.309-def.CairnsBedminsterfacility_"><txt break.before="1"><defterm guid="_3dfe34ec-3798-4f14-bfee-3d001fb828ad" id="sec.309-def.CairnsBedminsterfacility" type="definition">Cairns Bedminster facility</defterm> means the facility in Cairns for mechanical biological treatment using Bedminster technology to sort non-organic materials from mixed solid waste and compost the remaining organic material through drum composting and maturation.</txt></definition><definition affected.by.uncommenced="0" guid="_c30b8324-7bd3-4c17-b80f-055c29954587" id="sec.309-def.constructionanddemolitionwaste_"><txt break.before="1"><defterm guid="_8150195d-6703-4e10-b123-87e57d1b5b4e" id="sec.309-def.constructionanddemolitionwaste" type="definition">construction and demolition waste</defterm> means waste generated as a result of carrying out building work within the meaning of the <legref check="valid" jurisd="QLD" target.doc.id="act-1975-011" target.version.series="d9daab5f-059e-488d-ba00-96f36d4a1fe5" type="act"><name emphasis="yes">Building Act 1975</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.5" target.doc.id="act-1975-011" target.guid="_603806ea-a7f4-45e9-ab4b-6f7d37db8da7" target.version.series="d9daab5f-059e-488d-ba00-96f36d4a1fe5" type="act">section 5</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_90721371-f7ae-40a4-b254-7994c4b27c6d" id="sec.309-def.materialrecoveryfacility_"><txt break.before="1"><defterm guid="_af1d957b-e2cb-415c-896d-5de9969a18f6" id="sec.309-def.materialrecoveryfacility" type="definition">material recovery facility</defterm> means a facility for conducting a recycling activity that comprises sorting any waste other than construction and demolition waste, and preparing recyclable waste for marketing to users.</txt></definition><definition affected.by.uncommenced="0" guid="_18c6409f-a3b0-4051-b936-25b6c5c48cc3" id="sec.309-def.qualifyingperiod_"><txt break.before="1"><defterm guid="_b3cae094-5e01-4c82-970f-6a345888b803" id="sec.309-def.qualifyingperiod" type="definition">qualifying period</defterm> means the period starting on 1 July 2018 and ending on the commencement.</txt></definition><definition affected.by.uncommenced="0" guid="_5ef79947-b705-4847-9880-64c70070e596" id="sec.309-def.transitionperiod_"><txt break.before="1"><defterm guid="_186545c1-eb13-46ee-aa4a-47f5025de988" id="sec.309-def.transitionperiod" type="definition">transition period</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_26c8509a-8d6a-47f6-a1cd-15171b365d61" id="sec.309-def.transitionperiod-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for the Cairns Bedminster facility—the period starting on the commencement and ending on 30 June 2026; or</txt></block></li><li guid="_0158f4d4-c9b4-4d60-b14d-b08f01244b1c" id="sec.309-def.transitionperiod-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—the period starting on the commencement and ending on 30 June 2022.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_096079de-711c-4ca1-89ae-a2650f6140de" id="sec.309-def.transitionperiodexemptresiduewasteapplication_"><txt break.before="1"><defterm guid="_1dfc4161-61e6-41fd-a07e-93fdb86f6dde" id="sec.309-def.transitionperiodexemptresiduewasteapplication" type="definition">transition period exempt residue waste application</defterm> see section 310(1).</txt></definition></deflist></block></clause><clause affected.by.uncommenced="0" guid="_eb160bdc-eb96-439b-a2bd-044464e353a2" id="sec.310" provision.type="transitional" spent.amends="0"><no>310</no><heading guid="_b39b68f7-bd39-4a94-82bf-b6cf2061709f" id="sec.310-he">Application for approval of residue waste as exempt waste for transition period</heading><subclause affected.by.uncommenced="0" guid="_7f298798-92d1-4c67-b288-f4078ede8fe8" id="sec.310-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An entity that conducted a recycling activity during the qualifying period may apply to the chief executive for an approval that residue waste identified in the application (a <defterm guid="_19eff685-3ce2-4658-8677-05e8536b7791" id="sec.310-def.transitionperiodexemptresiduewasteapplication" type="definition">transition period exempt residue waste application</defterm>) is exempt waste for the transition period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ed740c86-61ca-45d5-81b6-6dcd04bb76c0" id="sec.310-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For an application relating to a material recovery facility, the application must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_60a8f498-4d83-4876-b309-80c4dfc15d6e" id="sec.310-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be made on or before 30 June 2019; and</txt></block></li><li guid="_48b94926-e4a3-42cd-9685-438e5ed1732e" id="sec.310-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li guid="_eb5313f6-ec99-4638-a68b-1ea65de277ff" id="sec.310-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">be supported by enough information to allow the chief executive to decide the application, including evidence that the applicant conducted a recycling activity during the qualifying period.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7c79a6fc-95a8-4c63-a849-77b729ed23fc" id="sec.310-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For an application relating to the Cairns Bedminster facility, the application must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_732d081e-35b3-44d0-92ed-bfbd27d64bf5" id="sec.310-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li guid="_e5cb205e-7494-46d5-a337-c626541a3ee4" id="sec.310-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">be supported by enough information to allow the chief executive to decide the application.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_daae2ae8-6ec1-4e4c-b0f3-7b6f63ea0924" id="sec.310-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">For an application not mentioned in subsection (2) or (3), the application must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9fbe1bfb-7347-4f20-bd87-50e87f984018" id="sec.310-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li guid="_dbbc59d7-02b6-4e94-b506-1928bdac85b4" id="sec.310-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">be supported by enough information to allow the chief executive to decide the application, including evidence that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8d562000-bc9e-4568-9881-34c745640391" id="sec.310-ssec.4-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the applicant conducted a recycling activity during the qualifying period; and</txt></block></li><li guid="_c01a2673-ca40-4ac0-a27a-4d9f5aa9aa0c" id="sec.310-ssec.4-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0"> payment of the waste levy on the residue waste from the applicant’s recycling activity would cause the applicant financial hardship to an extent that would stop its business from operating.</txt></block></li></list></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e3bf6b75-77c1-4843-ac6c-c16930ee8c54" id="sec.311" provision.type="transitional" spent.amends="0"><no>311</no><heading guid="_eee30046-f41c-4ba1-9697-bd53c7b0aeef" id="sec.311-he">Chief executive may require additional information or documents</heading><subclause affected.by.uncommenced="0" guid="_1b2dfcc1-c352-469d-b836-c715c92a256d" id="sec.311-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Within 28 days after receiving a transition period exempt residue waste application, the chief executive may, by notice given to the applicant, require the applicant to give the chief executive further reasonable information or documents about the application by a reasonable day stated in the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ddf36270-3141-4e9a-95fd-ff11df794ea0" id="sec.311-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application is taken to be withdrawn if the applicant does not give the chief executive the further information or documents by the stated day.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_204c9e8e-505d-46ef-a8f3-25280578cc33" id="sec.312" provision.type="transitional" spent.amends="0"><no>312</no><heading guid="_a0fac394-83fb-444a-bdca-dcdd7614e6ed" id="sec.312-he">Deciding application</heading><subclause affected.by.uncommenced="0" guid="_ac9339c1-6f26-4b77-926a-2f97ca40842f" id="sec.312-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must decide either to grant or to refuse a transition period exempt residue waste application within a period that is reasonable in the circumstances.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2fcce662-af3b-4729-bbfd-d3ccc5aa2b4b" id="sec.312-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In deciding the application, the chief executive must consider the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c2ffb649-6825-4df6-be57-46b646ab0240" id="sec.312-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the objects of this Act;</txt></block></li><li guid="_9b2105e9-e58f-4d93-a934-49e8c8687621" id="sec.312-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the information included in the application;</txt></block></li><li guid="_7f68fc38-76b9-400d-bb56-87280b0f4fa1" id="sec.312-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">whether adequate measures will be implemented to progressively minimise the amount of the applicant’s residue waste generation;</txt></block></li><li guid="_c592e2fb-5d3b-4b20-872d-b5345262ba35" id="sec.312-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">whether adequate measures will be implemented to ensure the applicant will be able to keep conducting the recycling activity after the transition period ends;</txt></block></li><li guid="_90deb372-63ae-4dc3-837e-86616729a96a" id="sec.312-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the applicant’s history of compliance with this Act and the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Environmental Protection Act</name></legref>, including whether the applicant holds any licences, environmental authorities or other approvals for conducting the recycling activity.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_4146fd07-835d-4711-a71d-98f309f9ca18" id="sec.312-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, the chief executive may consult with any expert reference group or other entity the chief executive considers suitable to provide advice in relation to financial hardship.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8c7c4222-a794-4012-83ed-4b8d80fe6f98" id="sec.312-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive must not grant the application unless satisfied the applicant conducted a recycling activity during the qualifying period and—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e8ff657a-b319-4235-bee4-76d9ea2f17b8" id="sec.312-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for a material recovery facility—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2d948175-1e40-4031-bb72-ef09bba7c284" id="sec.312-ssec.4-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the applicant’s performance history achieves as a minimum the recycling efficiency threshold; or</txt></block></li><li guid="_090fa5de-a310-46ec-ab11-7e21d991e02e" id="sec.312-ssec.4-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the strategies or practices proposed in the application to progressively improve the efficiency of the applicant’s recycling activity will enable the applicant to achieve as a minimum the recycling efficiency threshold during the period of the exemption; or</txt></block></li></list></block></li><li guid="_e8a28a3f-3e4e-4da6-8295-21643ed32171" id="sec.312-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for the Cairns Bedminster facility—the applicant will be able to achieve as a minimum the recycling efficiency threshold; or</txt></block></li><li guid="_6df362b0-82dc-475a-8bc1-a38bad706f29" id="sec.312-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">for any other applicant—payment of the waste levy on the residue waste from the recycling activity would cause the applicant financial hardship to an extent that would stop its business from operating.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_089660f3-aaac-466a-b40c-b640b68e7020" id="sec.312-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">However, subsection (4)(a) does not apply for a material recovery facility if the chief executive is satisfied that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fd1c1cfc-409a-449f-bdd5-03e5da7dea8d" id="sec.312-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">it is not reasonably practical for the applicant to achieve as a minimum the recycling efficiency threshold; and</txt></block></li><li guid="_0977929c-1adb-43b1-9295-39bc673db49a" id="sec.312-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the strategies or practices proposed in the application to progressively improve the efficiency of the applicant’s recycling activity will enable the applicant to achieve a recycling efficiency during the period of the exemption that is as close to the recycling efficiency threshold as is reasonably practical in the circumstances.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5acc59a3-c136-4abe-bc00-fa1430a876ab" id="sec.312-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">A failure to make a decision within a period that is reasonable in the circumstances is taken to be a decision by the chief executive to refuse the application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_97470d06-8fec-4c45-b37a-02ee8c2e4d03" id="sec.312-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_312731fc-8418-43a8-b685-74db1f1f9b09" id="sec.312-ssec.7-def.recyclingefficiencythreshold_"><txt break.before="1"><defterm guid="_170877bb-47eb-4fe3-b7f2-b286dcb48c8c" id="sec.312-ssec.7-def.recyclingefficiencythreshold" type="definition">recycling efficiency threshold</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9fd25f6f-f6b0-4302-bae1-ec11080f8d05" id="sec.312-ssec.7-def.recyclingefficiencythreshold-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for a material recovery facility—85% of the feedstock for a recycling activity is not disposed of as landfill as a result of the activity; or</txt></block></li><li guid="_ecd9850e-7407-452b-ae5a-e85a9463aba0" id="sec.312-ssec.7-def.recyclingefficiencythreshold-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for the Cairns Bedminster facility—33% of the feedstock for a recycling activity is not disposed of as landfill as a result of the activity.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_9128f5a2-1d77-44b5-89c7-b3326c472267" id="sec.313" provision.type="transitional" spent.amends="0"><no>313</no><heading guid="_b9da18bc-ebdc-4814-a307-8b73fed46156" id="sec.313-he">Grant of application</heading><subclause affected.by.uncommenced="0" guid="_19e14322-da56-4340-b0ca-bdc201a9be9f" id="sec.313-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the chief executive grants a transition period exempt residue waste application, the chief executive must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_413de6ce-fee5-4828-ad8c-3ec981cfb42a" id="sec.313-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in addition to any other conditions, impose a condition on the approval either—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_20d1e895-8992-4032-a183-18c506441425" id="sec.313-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0"> requiring the applicant maintain as a minimum a stated recycling efficiency; or</txt></block></li><li guid="_1d9b6325-4c5f-45f3-92d8-91f99d04835b" id="sec.313-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0"> limiting the amount of residue waste that will attract the discount rate in a period, including, for example, as a stated proportion of the amount of waste that is used as feedstock for the recycling activity in the period; and</txt></block></li></list></block></li><li guid="_83fb5daa-5bf3-4917-a6fc-d7285e0f47fc" id="sec.313-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give the applicant notice of the grant stating the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_75a1167e-d2c6-4382-bdd1-0a0351ef841d" id="sec.313-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the application has been granted;</txt></block></li><li guid="_46fdd551-1ce9-442f-bcef-63ff55f4c6fc" id="sec.313-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the period for which the residue waste identified in the application is approved to be exempt waste;</txt></block></li><li guid="_854a10ba-b751-4da4-a977-5d51795c8267" id="sec.313-ssec.1-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">any conditions imposed on the approval, including any limits on the types and amounts of residue waste that may be disposed of as exempt waste in the period mentioned in subparagraph (ii);</txt></block></li><li guid="_8aefb654-82da-4e55-a739-1dff1b35438c" id="sec.313-ssec.1-para1.b-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">any conditions prescribed by regulation applying to the approval.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ed179241-3dec-480e-903b-eb9d6f8e19cc" id="sec.313-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the application relates to the Cairns Bedminster facility, the period mentioned in subsection (1)(b)(ii) must not be more than 3 years.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1feac777-e2d5-4f1c-a900-9be1bfdbc902" id="sec.313-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The notice must include or be accompanied by an information notice for the decision to impose a condition unless the condition is the same, or substantially the same, as a condition agreed to or asked for by the applicant.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ad103a74-b42e-43ce-974e-ccd75896c31d" id="sec.313-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The approval is subject to any conditions imposed by the chief executive and any conditions prescribed by regulation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c25e061b-c6f5-4c46-9138-ea20f6a51be8" id="sec.313-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_0fd7b028-b998-4542-b338-21250e01bf83" id="sec.313-ssec.5-def.recyclingefficiency_"><txt break.before="1"><defterm guid="_c0ff0a96-6868-4d48-8002-593dfe8de2a4" id="sec.313-ssec.5-def.recyclingefficiency" type="definition">recycling efficiency</defterm> means a percentage of the feedstock for a recycling activity that is not disposed of as landfill as a result of the activity.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_05eb24c9-1d11-4fb2-b9f4-230843438bde" id="sec.314" provision.type="transitional" spent.amends="0"><no>314</no><heading guid="_0715549b-200f-4dd3-b072-662ac7573a1d" id="sec.314-he">Refusal of application</heading><block><txt break.before="1">If the chief executive refuses a transition period exempt residue waste application, the chief executive must give the applicant an information notice for the decision.</txt></block></clause><clause affected.by.uncommenced="0" guid="_b1df8b8a-5fc0-4fab-8110-03f14cf14889" id="sec.315" provision.type="transitional" spent.amends="0"><no>315</no><heading guid="_49dbc16a-1f7b-4c60-a334-b3e6a8eacf3f" id="sec.315-he">Cancellation or amendment of approval by chief executive</heading><subclause affected.by.uncommenced="0" guid="_113088fb-1601-406b-9cad-bffa47d21a59" id="sec.315-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may cancel or amend an approval that residue waste is exempt waste granted under section 312 if the chief executive considers there are reasonable grounds to cancel or amend it.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d869f534-03be-4ddc-8295-54631372ab71" id="sec.315-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting subsection (1), the grounds for cancelling or amending the approval may include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ff3d9302-3b87-4446-9738-abf433a3ffc7" id="sec.315-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that the chief executive is satisfied there is a reasonable suspicion that the approval holder has not implemented strategies or practices to progressively improve the efficiency of the holder’s recycling activities during the period of the approval; and</txt></block></li><li guid="_82749a04-498a-4795-9ef1-345d918304d3" id="sec.315-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that the chief executive is satisfied there is a reasonable suspicion that the application was granted because of a false or misleading representation or declaration; and</txt></block></li><li guid="_91ac269e-4713-4868-90b7-1e7522626682" id="sec.315-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the circumstances that were relevant to the granting of the application have changed; and</txt></block></li><li guid="_668b5825-aa7e-414f-8845-399392a72555" id="sec.315-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">that the limits or conditions of the approval have not been complied with; and</txt></block></li><li guid="_67d556e9-2074-43fa-a083-a1763dc337b8" id="sec.315-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">that it is desirable to cancel the approval having regard to the objects of this <legref check="invalid" jurisd="QLD" type="act">Act</legref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ccb5a47d-a34d-46dd-8598-f44c62625919" id="sec.315-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Before cancelling or amending the approval (the <defterm guid="_e316758a-cec3-407a-89bc-b3cacd69b55e" id="sec.315-def.proposedaction" type="definition">proposed action</defterm>), the chief executive must give notice to the holder of the approval stating the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7e45a926-65b0-42d0-a2e7-fd19b5040819" id="sec.315-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the proposed action;</txt></block></li><li guid="_0e8b8242-c20c-4aeb-9924-fe75ded41878" id="sec.315-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the grounds for taking the proposed action;</txt></block></li><li guid="_5d623840-a376-4937-8b54-2a6e155d6d58" id="sec.315-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the facts and circumstances that form the basis for the grounds;</txt></block></li><li guid="_ebeaf18e-6c52-4bc8-84fd-b7c2cb0206a3" id="sec.315-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">when the proposed action is intended to take effect;</txt></block></li><li guid="_217d7bc9-0cfc-4578-9f6e-dd2501da7d6b" id="sec.315-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">that the holder may make, within a stated period, written submissions to show why the proposed action should not be taken.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f281e974-6ec2-4afe-bf94-64a68cc4602d" id="sec.315-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The stated period for submissions must not end earlier than 21 days after the holder of the approval is given the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7a2da286-9685-4bbc-b602-80d636ae670d" id="sec.315-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The chief executive must consider all submissions made under subsection (3)(e).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ab6caa7d-d77c-4c41-ad3a-23a2520bd06f" id="sec.315-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">If the chief executive decides to take the proposed action, the chief executive must, within 10 business days after making the decision, give the holder of the approval an information notice for the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_315948ef-4e70-465f-a4b9-427c2525f1ba" id="sec.315-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">The decision takes effect when the information notice is given to the holder of the approval.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_6aed8e93-36b9-48e8-9755-6608df7f4b98" id="sec.316" provision.type="transitional" spent.amends="0"><no>316</no><heading guid="_0ddb46c4-460a-4ec2-9d9b-ba670d798d7b" id="sec.316-he">Automatic cancellation of approval</heading><block><txt break.before="1">An approval that residue waste is exempt waste, granted under section 312, is automatically cancelled if the business of conducting the recycling activity relevant to the approval ceases to be owned by the entity granted the approval, including, for example, because ownership of the business is transferred to another entity.</txt></block></clause></division><division affected.by.uncommenced="0" guid="_20c9fa1e-c7ab-406b-940e-e5870e93dfe4" id="ch.16-pt.3-div.2"><no>Division 2</no><heading guid="_37f1c32c-eb24-4bd1-952f-0634d1835e13" id="ch.16-pt.3-div.2-he">Exemption from weighbridge requirements for particular sites until 30 June 2029</heading><clause affected.by.uncommenced="0" guid="_92880d31-78fc-454f-962e-6ca93d87ced1" id="sec.317" provision.type="transitional" spent.amends="0"><no>317</no><heading guid="_926a8bf9-0edc-4137-9ff2-63d01736468b" id="sec.317-he">Application for exemption from s 57 until 30 June 2029</heading><subclause affected.by.uncommenced="0" guid="_0c21ccdf-3df7-4400-831c-019dff70b96d" id="sec.317-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the operator of a levyable waste disposal site in existence at the commencement for which the operator holds an environmental authority for the disposal of not more than 2,000 tonnes of waste in a year at the site.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_711e8c0e-aeaa-41cd-a8d4-0106fd7b69c6" id="sec.317-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The operator may apply to the chief executive for an exemption during the transition period from the requirements under section 57.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_cc326e60-a97c-47ee-b6a6-a9f000657856" id="sec.317-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The application must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d09fdfd0-3625-436c-b305-356d301882cf" id="sec.317-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be made before 1 January 2024; and</txt></block></li><li guid="_39b86bb0-cd22-4f6a-8c0d-4217256f364c" id="sec.317-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">be in the approved form.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5825010d-76c2-4c5a-a954-0e485fad6c30" id="sec.317-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_2b06be6d-c432-486b-9fc0-6b46e0fc8e12" id="sec.317-ssec.4-def.transitionperiod_"><txt break.before="1"><defterm guid="_a7f62f81-bbbd-4b68-87b8-15b1e3f74113" id="sec.317-ssec.4-def.transitionperiod" type="definition">transition period</defterm> means the period starting at the beginning of 1 July 2024 and ending at the end of 30 June 2029.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_06e40936-3ebc-466f-bbf3-35702072da26" id="sec.318" provision.type="transitional" spent.amends="0"><no>318</no><heading guid="_94a11adf-1230-4a95-af24-81e66cf013b4" id="sec.318-he">Chief executive may require additional information or documents</heading><subclause affected.by.uncommenced="0" guid="_a8384bc1-9cd3-40da-9cdd-feed2ec20c11" id="sec.318-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Within 28 days after receiving an application made under section 317, the chief executive may, by notice given to the applicant, require the applicant to give the chief executive further reasonable information or documents about the application by a reasonable day stated in the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1fb5e7e4-0ce8-4ddf-a650-45d375f109e9" id="sec.318-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application is taken to be withdrawn if the applicant does not give the chief executive the further information or documents by the stated day.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_bb3b20f8-fc55-4032-b080-63359b223501" id="sec.319" provision.type="transitional" spent.amends="0"><no>319</no><heading guid="_d48d458f-b070-4fc0-bc62-4cfd2ae31134" id="sec.319-he">Deciding application</heading><subclause affected.by.uncommenced="0" guid="_567eedeb-7c88-4de9-91ef-91dc31116f78" id="sec.319-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must decide either to grant or to refuse an application made under section 317 within a period that is reasonable in the circumstances.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ad306c67-6f26-4544-b331-fb0bcd184c01" id="sec.319-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In deciding the application, the chief executive must consider—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_89388db1-2b05-4a98-b1a5-44df9fcbe5f0" id="sec.319-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the objects of this Act; and</txt></block></li><li guid="_46fd49bc-629f-4a7f-9327-a140c1dc17e7" id="sec.319-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the information included in the application.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_80a89ee0-f2ef-4b30-acb2-92e1383174db" id="sec.319-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A failure to make a decision within a period that is reasonable in the circumstances is taken to be a decision by the chief executive to refuse the application.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1491adbb-070e-473c-89ef-8a35682330b4" id="sec.320" provision.type="transitional" spent.amends="0"><no>320</no><heading guid="_84aaf2d9-ba12-43aa-a880-6a55318759fe" id="sec.320-he">Grant of application</heading><subclause affected.by.uncommenced="0" guid="_4f911669-c567-4d3f-a7b4-6d11b5ffa64f" id="sec.320-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the chief executive grants an application made under section 317, the chief executive must give the applicant a notice stating—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cf0559be-a68d-4a2e-91cd-96fd3758ef62" id="sec.320-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the application has been granted; and</txt></block></li><li guid="_ae94a9fb-ec20-43b5-abfa-113d3815624b" id="sec.320-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any conditions imposed on the approval.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a3d2e89c-88bd-4670-b29f-de65ae127174" id="sec.320-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Also, if the chief executive imposes a condition on the approval, the notice must include or be accompanied by an information notice for the decision to impose the condition.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e9ceb944-2dd7-462e-94e6-fb6166dd989f" id="sec.320-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, subsection (2) does not apply to a condition that is substantially the same as a condition agreed to or asked for by the applicant.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_27fbe566-2ef0-4ada-982f-dc30be293b8d" id="sec.321" provision.type="transitional" spent.amends="0"><no>321</no><heading guid="_d397d322-73e7-47ed-8507-320a6ea00bfa" id="sec.321-he">Refusal of application</heading><block><txt break.before="1">If the chief executive refuses an application made under section 317, the chief executive must give the applicant an information notice for the decision.</txt></block></clause></division><division affected.by.uncommenced="0" guid="_241c4a31-a258-4a70-a0be-80c57003d8bf" id="ch.16-pt.3-div.3"><no>Division 3</no><heading guid="_a82983ff-88d9-4657-ad8c-682dd53fb548" id="ch.16-pt.3-div.3-he">Other matters</heading><clause affected.by.uncommenced="0" guid="_737ea0f0-ca67-495b-bd89-b267bdeb0336" id="sec.322" provision.type="transitional" spent.amends="0"><no>322</no><heading guid="_c4740150-eb9e-4e4a-97a7-5bc18b29ceb1" id="sec.322-he">Exemption from using weighbridge for stated period in stated circumstances</heading><block><txt break.before="1">Until the end of 30 June 2020, the operator of a waste disposal site is not obliged to use a weighbridge to measure waste or other material as required under section 59 if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7c248cdd-0768-4bfa-894a-1085dd74f608" id="sec.322-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the operator has, before the commencement, given the chief executive written notice that it is not practicable to use the weighbridge to measure and record waste or other material delivered to the site in a vehicle with a GCM or GVM of 4.5 tonnes or less; and</txt></block></li><li guid="_8f86baff-a24f-41b6-a4ef-a582cbfd4ace" id="sec.322-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the notice mentioned in paragraph (a) identifies the site and explains the steps the operator is taking to ensure it will be practicable to use the weighbridge to measure and record waste or other material at the site by 1 July 2020; and</txt></block></li><li guid="_cbd6811c-d002-4e8c-b128-2318191298a8" id="sec.322-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the waste or other material is moved in a vehicle with a GCM or GVM of 4.5 tonnes or less; and</txt></block></li><li guid="_32126eac-6ae5-482a-8b04-ff7c7c8cb368" id="sec.322-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the operator complies with the weight measurement requirements prescribed by regulation.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_6005d7c6-27de-4a33-9a25-8f5622958c79" id="sec.323" provision.type="transitional" spent.amends="0"><no>323</no><heading guid="_64168f02-a71b-406c-ae73-a3ba80d3dfa8" id="sec.323-he">Volumetric survey of levyable waste disposal site to be carried out within stated period</heading><subclause affected.by.uncommenced="0" guid="_a331de35-effe-4686-8ff3-ac95a79997f7" id="sec.323-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Between <b>1 June 2019 and the end of August 2019,</b> the operator of a levyable waste disposal site in the waste levy zone must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b364f49d-1b08-4eb3-8fe8-33733d841896" id="sec.323-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">ensure that a volumetric survey is carried out for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8069a6ad-704c-4f87-afde-e2d744fbd704" id="sec.323-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">each active landfill cell at the site; and</txt></block></li><li guid="_1cf24afb-6cd1-40f2-abc4-cda50b6744ae" id="sec.323-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">all stockpiled waste at the site; and</txt></block></li></list></block></li><li guid="_7a5566ad-6b58-4f15-bd1c-d8e1b3afa9b9" id="sec.323-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give the chief executive a copy of the results of the survey in the approved form.</txt></block></li></list></block><penalty guid="_a7d8b79a-8cbd-40b3-b4bc-427d3aeb6219" id="sec.323-ssec.1-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_622ab633-453e-41c1-9c03-896aaf9d1fa4" id="sec.323-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The volumetric survey must be carried out in compliance with the requirements prescribed by regulation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a103a9ff-649b-4fa2-a583-65afe9c2be31" id="sec.323-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The results of the volumetric survey must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b7249df1-0e11-425f-98d7-12f189f998a8" id="sec.323-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in electronic form; and</txt></block></li><li guid="_3b8fa523-1d72-4a66-b915-86d1f3ca1038" id="sec.323-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">include a topographical plan complying with specifications advised by the chief executive; and</txt></block></li><li guid="_4ae4ea81-8626-4c11-b6cd-47b367b8ae0e" id="sec.323-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">include details of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9d60a80f-1086-4724-8067-282344d43409" id="sec.323-ssec.3-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the area of the levyable waste disposal site;</txt></block></li><li guid="_2954c653-871d-44de-8c2f-6298d91aa5a0" id="sec.323-ssec.3-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the site’s landfill capacity;</txt></block></li><li guid="_a24353fc-3bca-45f1-93cf-55d9c7510a1d" id="sec.323-ssec.3-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the stockpiles of waste at the site; and</txt></block></li></list></block></li><li guid="_2d8a8d16-b0df-496f-b6d1-2710d9fff400" id="sec.323-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">be certified as accurate by a surveyor under the <legref check="valid" jurisd="QLD" target.doc.id="act-2003-070" target.version.series="58bf4472-9a2d-4809-9f04-c4ff625373da" type="act"><name emphasis="yes">Surveyors Act 2003</name></legref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b9fb1b37-f186-4e93-9933-1f7e0065da72" id="sec.323-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">After carrying out the volumetric survey under this section, the operator must ensure that a copy of the results of the survey is kept as a document in hard copy form at the levyable waste disposal site for at least 5 years after the survey is carried out.</txt></block><penalty guid="_070b2e5c-3237-4e67-b601-c984faaed5be" id="sec.323-ssec.4-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_eaa03c90-f4b5-49e2-99d3-9328adcfd781" id="sec.323-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Subsections (6) and (7) apply if the operator of a levyable waste disposal site fails to comply with subsection (1).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_905f4112-8946-4ab6-804b-921c4db4a696" id="sec.323-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The chief executive may arrange for the volumetric survey to be carried out at the site and for that purpose may direct an authorised person to enter the site and carry out the survey.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d7d13eda-3cc1-4cca-865a-ee1ab9c5dccc" id="sec.323-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">The chief executive may recover the cost of carrying out the volumetric survey from the operator as a debt payable by the operator to the State.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e4fc9ccb-8d4c-4ad4-b9ff-8820017d8c7f" id="sec.324" provision.type="transitional" spent.amends="0"><no>324</no><heading guid="_8f9e4357-1ad8-42dc-8cf9-3d2126d8fa69" id="sec.324-he">Volumetric survey of resource recovery area to be carried out within stated period</heading><subclause affected.by.uncommenced="0" guid="_4bb80ee5-8cdf-424a-a2c0-20b9527a9acb" id="sec.324-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Between 1 June 2019 and the end of August 2019<b>,</b> the entity having responsibility for the operation of a resource recovery area for a waste disposal site in the waste levy zone must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_28ef3158-111e-4939-a599-fbe19930ca4a" id="sec.324-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">ensure that a volumetric survey is carried out for all stockpiled waste at the area; and</txt></block></li><li guid="_9bd0881b-7e93-43db-a4be-9e3330235b8b" id="sec.324-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give the chief executive a copy of the results of the survey in the approved form.</txt></block></li></list></block><penalty guid="_6b47100b-3fa3-44b8-8ad3-579fe826a2d6" id="sec.324-ssec.1-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_557c6bc3-01ae-4903-838e-3c9d6c56d1cc" id="sec.324-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The volumetric survey must be carried out in compliance with the requirements prescribed by regulation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_31112eb9-81ff-4e94-91e3-aef92ccbad55" id="sec.324-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The results of the volumetric survey must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_25108e23-4733-4a71-9e51-b90d6fa52dce" id="sec.324-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in electronic form; and</txt></block></li><li guid="_3fd1a01b-47e5-43e1-8e1f-69fec397576f" id="sec.324-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">include a topographical plan complying with specifications advised by the chief executive; and</txt></block></li><li guid="_5429871f-c454-405d-b487-2d0e4e0c22c8" id="sec.324-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">include details of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_813212a0-fc1d-490e-8644-35cea90fbe8a" id="sec.324-ssec.3-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the area of the resource recovery area;</txt></block></li><li guid="_cf8165aa-0083-49a7-b7f3-5e88ea85356c" id="sec.324-ssec.3-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the stockpiles of waste at the area; and</txt></block></li></list></block></li><li guid="_8c2ffbae-f0f9-4e96-ac03-61ffb73ed198" id="sec.324-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">be certified as accurate by a surveyor under the <legref check="valid" jurisd="QLD" target.doc.id="act-2003-070" target.version.series="58bf4472-9a2d-4809-9f04-c4ff625373da" type="act"><name emphasis="yes">Surveyors Act 2003</name></legref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1e23bef3-4622-4fbb-9afb-ff3bb05806a1" id="sec.324-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">After carrying out the volumetric survey under this section, the entity must ensure that a copy of the results of the survey is kept as a document in hard copy form at the levyable waste disposal site for at least 5 years after the survey is carried out.</txt></block><penalty guid="_9bff5289-0941-4bbe-bd57-469d33477a47" id="sec.324-ssec.4-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_f8e68b53-1520-4c0e-8830-2cb55a49359e" id="sec.324-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Subsections (6) and (7) apply if an entity having responsibility for the operation of a resource recovery area fails to comply with subsection (1).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d1fc6188-9c50-40af-9ec9-2d8659daafaf" id="sec.324-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The chief executive may arrange for the volumetric survey to be carried out at the resource recovery area and for that purpose may direct an authorised person to enter the area and carry out the survey.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fdd8b067-8c28-491b-9345-33d3097d53d4" id="sec.324-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">The chief executive may recover the cost of the volumetric survey from the entity as a debt payable by the entity to the State.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c9b3a96d-3c81-423f-981e-08aab11a82c4" id="sec.325" provision.type="transitional" spent.amends="0"><no>325</no><heading guid="_187be334-7d14-47c8-a23e-484be8e1c3da" id="sec.325-he">Temporary relaxation from s 59 measuring requirements for small site</heading><block><txt break.before="0">Until the end of 30 June 2021, the operator of a small site is not obliged to measure waste as required under section 59 if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6c76101f-c607-4009-9cb3-8d2b787fbc0c" id="sec.325-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the operator has, before the commencement, given the chief executive written notice of a proposed alternative methodology for measuring and recording waste at the site; and</txt></block></li><li guid="_7462c3b2-c214-4712-bf8a-2b1636b5ae0a" id="sec.325-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the notice mentioned in paragraph (a) identifies the site and includes details of the proposed alternative methodology; and</txt></block></li><li guid="_2afc8ac5-88b5-4515-a014-08d892e9550b" id="sec.325-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the proposed alternative methodology enables the operator to fairly work out the total of the waste levy amount owing to the chief executive on waste delivered, or moved from stockpile to landfill, at the site; and</txt></block></li><li guid="_59b617de-9679-489a-95d0-c816b5779046" id="sec.325-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the operator is implementing the alternative methodology in accordance with its terms.</txt></block></li></list></block></clause></division></part><part affected.by.uncommenced="0" change="ins" guid="_205b8b6a-bfac-476d-a538-08f429cc39e4" id="ch.16-pt.5"><no>Part 5</no><heading guid="_4291cab8-592e-4e4c-8b10-4bc7267c3f58" id="ch.16-pt.5-he">Transitional provisions for <legref check="unknown" jurisd="QLD" type="act" valid.date="as.made"><name emphasis="no">Waste Reduction and Recycling and Other Legislation Amendment Act 2023</name></legref></heading><clause affected.by.uncommenced="0" guid="_af83dc46-8e79-465f-b6dd-6f579bf3cd7b" id="sec.330" provision.type="transitional" spent.amends="0"><no>330</no><heading guid="_570e070e-237c-4135-8b23-ef1ad556587b" id="sec.330-he">Application of part</heading><block><txt break.before="1">This part applies if, before the commencement, an annual payment was made to a local government under former section 73D(1).</txt></block></clause><clause affected.by.uncommenced="0" guid="_d35c9e3c-cc78-4532-ba31-8581c7d3f52f" id="sec.331" provision.type="transitional" spent.amends="0"><no>331</no><heading guid="_28ed265f-bd46-4f49-b44e-7be8b106fad9" id="sec.331-he">Definitions for part</heading><block><txt break.before="1">In this part—</txt><deflist><definition affected.by.uncommenced="0" guid="_9b6789fb-57c9-4db9-849d-d4807c4a1b2d" id="sec.331-def.former_"><txt break.before="1"><defterm guid="_2bcd8003-f8e4-454b-9ed0-0f67db49701b" id="sec.331-def.former" type="definition">former</defterm>, for a provision of this Act, means the provision as in force from time to time before the commencement.</txt></definition><definition affected.by.uncommenced="0" guid="_f8d15cfd-729e-4891-a611-35688a1de0d2" id="sec.331-def.new_"><txt break.before="1"><defterm guid="_0d82bfc3-d400-4cab-aa17-7da36cdc2569" id="sec.331-def.new" type="definition">new</defterm>, for a provision of this Act, means the provision as in force from the commencement.</txt></definition></deflist></block></clause><clause affected.by.uncommenced="0" guid="_d5cf2489-c8d0-468a-846c-6af23d651899" id="sec.332" provision.type="transitional" spent.amends="0"><no>332</no><heading guid="_31876834-4b1b-4d65-8c02-7bd8ae313e27" id="sec.332-he">Application of new s 73DC in relation to annual payments made before commencement</heading><subclause affected.by.uncommenced="0" guid="_253b5685-ac8a-4582-b159-843d55d42ad1" id="sec.332-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, immediately before the commencement, the local government had not used all of the annual payment as required under former section 73D(2).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_560e1736-f99f-4591-83c5-0c4ee09ec5d0" id="sec.332-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">New section 73DC applies in relation to the unused amount of the annual payment as if it were an amount paid to the local government under new section 73DA(2).</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3a5411fb-8d40-466a-b9bb-7043411d8422" id="sec.333" provision.type="transitional" spent.amends="0"><no>333</no><heading guid="_8a886d99-7b07-44b0-8a1c-76e2502fbc34" id="sec.333-he">Application of new s 73DD in relation to annual payments made before commencement</heading><subclause affected.by.uncommenced="0" guid="_085d033b-2b74-41b5-9d1e-4bcdb152d1c1" id="sec.333-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">New section 73DD applies in relation to the annual payment as if it were an amount paid to the local government under new section 73DA(2).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5722e616-d69f-45be-849c-ef596594be5a" id="sec.333-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the local government is taken to have complied with new section 73DD(1) in relation to an entity if, before the commencement—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e6c44e2e-0736-48ed-b511-142e50799eb5" id="sec.333-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">1 or more rate notices issued to the entity by the local government, after receiving the annual payment, included a statement of the matters mentioned in former section 73D(4) in relation to the payment; or</txt></block></li><li guid="_5c0a1109-5598-4872-97d3-1480891ee24e" id="sec.333-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the local government informed the entity of the amount paid and the purpose of the annual payment as mentioned in former section 73D(5).</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_fda06dff-4037-441f-9acd-fbb4da367c8a" id="sec.334" provision.type="transitional" spent.amends="0"><no>334</no><heading guid="_ee2cea64-7092-4642-a511-50c6b315b8a2" id="sec.334-he">Application of new s 73DE if misinformation distributed in relation to annual payments made before commencement</heading><subclause affected.by.uncommenced="0" guid="_193d65f2-be84-4306-8b8f-731096088903" id="sec.334-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">New section 73DE applies in relation to the annual payment—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_03c0b10c-97be-421e-a3fa-72401903a6fc" id="sec.334-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">as if the payment were an amount paid to the local government under new section 73DA(2); and</txt></block></li><li guid="_fd631ef9-a543-457b-bd51-937459c42137" id="sec.334-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether the misinformation is believed to have been distributed before or after the commencement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b41ffafb-627f-4c50-8fff-241bf9dd8986" id="sec.334-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, a statement made before the commencement in relation to the annual payment is misinformation distributed in relation to the payment only if the statement would have been misinformation within the meaning of former section 73D.</txt></block></subclause></clause></part></chapter></body></wrapper><schedules affected.by.uncommenced="0" numbering.style="manual"><schedule affected.by.uncommenced="0" guid="_f2b09754-cc3b-4770-8f1e-2cd6e66793a9" id="sch" provision.type="other" spent.amends="0" type="schedule"><no>Schedule</no><heading guid="_9241a3ed-5701-4921-9228-f4402f6fd25e" id="sch-he">Dictionary</heading><sourceref affected.by.uncommenced="0" guid="_5c0f5471-8fcb-47c7-a488-18c14d1cfe9c" id="sch-ref"><intref check="valid" refid="sec.7" target.guid="_a5233574-e098-4075-bb69-a22e2aa9c815">section 7</intref></sourceref><block><deflist><definition affected.by.uncommenced="0" guid="_dd4e58e1-8386-4f3f-9ecc-f17a11678d4d" id="sch-def.accreditedproductstewardshipscheme_"><txt break.before="1"><defterm guid="_21575004-daba-4051-b669-488b2084ed91" id="sch-def.accreditedproductstewardshipscheme" type="definition">accredited product stewardship scheme</defterm> see <intref check="valid" refid="sec.87" target.guid="_afd9f14c-0c89-4aef-81b7-03178dc6e94f">section 87</intref><intref check="valid" refid="sec.87-ssec.2" target.guid="_ad9813da-2263-4950-be54-55a4fbeda6d3">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_d721627d-15dd-4aff-8a58-5cb3a4230a94" id="sch-def.acidsulfatesoil_"><txt break.before="1"><defterm guid="_025f2a7a-b540-4cdd-bd7a-d50ed7f2133c" id="sch-def.acidsulfatesoil" type="definition">acid sulfate soil</defterm> means soil or sediment containing iron sulfides that produces sulphuric acid when exposed to air.</txt></definition><definition affected.by.uncommenced="0" guid="_91de5f72-d378-419b-9de2-bbe7e8c3da92" id="sch-def.activelandfillcell_"><txt break.before="1"><defterm guid="_9155a89d-6eaa-477b-a67a-97dd22dc52dc" id="sch-def.activelandfillcell" type="definition">active landfill cell</defterm> see <intref check="valid" refid="sec.26" target.guid="_5010083a-a6a1-4327-8946-4fe72cdbaedc">section 26</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_486b0017-d376-4f5d-ab6a-10000c4c2fad" id="sch-def.advertisingmaterial_"><txt break.before="1"><defterm guid="_6bef6f4f-1bc8-48e1-902c-31b836affb28" id="sch-def.advertisingmaterial" type="definition">advertising material</defterm> see <intref check="valid" refid="sec.105" target.guid="_285a6f07-9e48-4f36-ac7d-1ff5846819bf">section 105</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_90e76136-2246-43f9-9ea0-56b2a71d69b7" id="sch-def.alternativeshoppingbag_"><txt break.before="1"><defterm guid="_445941a3-74f2-465e-85b6-2dc125a54647" id="sch-def.alternativeshoppingbag" type="definition">alternative shopping bag</defterm> see <intref check="valid" refid="sec.99B" target.guid="_b670feba-5739-4c23-a2dd-3efd56ae3be0">section 99B</intref><intref check="valid" refid="sec.99B-ssec.3" target.guid="_8de67671-d51e-4b72-98f4-68a769cec1fd">(3)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_43a9465e-34a8-4dd8-bbed-3c286339d76c" id="sch-def.amend_"><txt break.before="1"><defterm guid="_47a735e2-e6ae-43b0-9e03-ca6f9a39af0c" id="sch-def.amend" type="definition">amend</defterm>, an end of waste approval, for <intref check="valid" refid="ch.8" target.guid="_598380ab-31bf-4319-8271-2fc98c9c0cef">chapter 8</intref>, see <intref check="valid" refid="sec.156" target.guid="_475775cb-1225-4273-a6a1-084d20d8d817">section 156</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_2899980f-1341-4bbf-acc2-0979c08b354b" id="sch-def.amendmentapplication_"><txt break.before="1"><defterm guid="_25991366-7960-4e3a-9ada-a20db314855e" id="sch-def.amendmentapplication" type="definition">amendment application</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a97424ee-6218-4f72-a08a-6eb22fe60c62" id="sch-def.amendmentapplication-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for <intref check="valid" refid="ch.4" target.guid="_d097040d-7d09-4509-a319-3458078dbcf6">chapter 4</intref>, <intref check="valid" refid="ch.4-pt.5" target.guid="_f76bac62-fb51-496d-9f22-9cbcfa27127c">part 5</intref>—see <intref check="valid" refid="sec.102P" target.guid="_9f0f6693-8344-465d-8c89-3a2404a7c65d">section 102P</intref><intref check="valid" refid="sec.102P-ssec.1" target.guid="_7596a2a4-dd08-419b-b18b-c6026974d93a">(1)</intref>; or</txt></block></li><li guid="_8d3cfd87-8c7a-4fab-be7a-b64fec1b2999" id="sch-def.amendmentapplication-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for <intref check="valid" refid="ch.8" target.guid="_598380ab-31bf-4319-8271-2fc98c9c0cef">chapter 8</intref>, <intref check="valid" refid="ch.8-pt.3" target.guid="_b318dbae-1ab4-40ae-b90d-2edf52e8defa">part 3</intref>—see <intref check="valid" refid="sec.173M" target.guid="_9a5e6125-cae7-40d5-8e57-fed3656d5ee7">section 173M</intref><intref check="valid" refid="sec.173M-ssec.1" target.guid="_f97ea79f-9c45-47c2-bba9-8cbd1cd558b9">(1)</intref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_3e26636a-9580-4b08-b7da-aa528ffc5338" id="sch-def.applicant_"><txt break.before="1"><defterm guid="_af2bf9ce-e8c6-479b-83b5-49322745ea19" id="sch-def.applicant" type="definition">applicant</defterm>, for <intref check="valid" refid="ch.4" target.guid="_d097040d-7d09-4509-a319-3458078dbcf6">chapter 4</intref>, <intref check="valid" refid="ch.4-pt.5" target.guid="_f76bac62-fb51-496d-9f22-9cbcfa27127c">part 5</intref>, <intref check="valid" refid="ch.4-pt.5-div.2" target.guid="_b93bb7b0-f457-4073-a9b8-82da7ae5d911">division 2</intref>, see <intref check="valid" refid="sec.102E" target.guid="_d95013d5-8a10-4aa8-a3a0-4415963fb9ce">section 102E</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_5397e166-22d3-4c15-a066-19ab420fc223" id="sch-def.appropriatelyqualified_"><txt break.before="1"><defterm guid="_86dcce99-ee9c-4843-a5ee-ac8dcaedf474" id="sch-def.appropriatelyqualified" type="definition">appropriately qualified</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3deb0328-0861-48c0-99ae-74e81669cb97" id="sch-def.appropriatelyqualified-para1.1" provision.type="other"><no>1</no><block><txt break.before="0"><defterm guid="_986663ab-bfbc-442a-8eba-61296504f194" type="mention">Appropriately qualified</defterm>, for an entity to whom a power under this Act may be delegated, includes having the qualifications, experience or standing appropriate to exercise the power.</txt><note guid="_9c73d5b9-c427-4898-bcd4-c7643aa88aa4" id="sch-def.appropriatelyqualified-para1.1-note" type="example"><heading guid="_e10e28bd-15a8-4975-94b7-7db880b6d56a" id="sch-def.appropriatelyqualified-para1.1-note-he">Example of standing—</heading><block><txt break.before="1">a person’s classification level in the public service</txt></block></note></block></li><li guid="_ea90a385-4c42-4f0e-9164-f04380900f00" id="sch-def.appropriatelyqualified-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">If the power may be subdelegated by a local government, the following are <defterm guid="_dd34c44e-c789-41ee-b1e5-d7fee007873c" type="mention">appropriately qualified</defterm> entities for the subdelegation—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d539cae6-1969-4185-bf6a-008be057d6d4" id="sch-def.appropriatelyqualified-para1.2-para2.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the local government’s mayor;</txt></block></li><li guid="_957f9fc5-6fa8-403e-ba57-4b0dff95652a" id="sch-def.appropriatelyqualified-para1.2-para2.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a standing committee or a chairperson of a standing committee of the local government;</txt></block></li><li guid="_e627933b-b223-4957-b5ca-69e2139659c0" id="sch-def.appropriatelyqualified-para1.2-para2.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the local government’s chief executive officer;</txt></block></li><li guid="_c80663cc-bca0-4804-ad67-b59d92146586" id="sch-def.appropriatelyqualified-para1.2-para2.d" provision.type="other"><no>(d)</no><block><txt break.before="0">an employee of the local government, having the qualifications, experience or standing appropriate to exercise the power.</txt><note guid="_743f39b4-9bb6-45e3-b3ac-9e8f3f27637c" id="sch-def.appropriatelyqualified-para1.2-para2.d-note" type="example"><heading guid="_b93a8fcf-9fec-4487-b659-890ecd6edc06" id="sch-def.appropriatelyqualified-para1.2-para2.d-note-he">Example of standing for <intref check="invalid" refid="sch-def.appropriatelyqualified-para1.d">paragraph (d)</intref>—</heading><block><txt break.before="1">the employee’s classification level in the local government</txt></block></note></block></li></list></block></li></list></definition><definition affected.by.uncommenced="0" guid="_cf036c70-b17c-401e-b01e-5310a8c4198c" id="sch-def.approval_"><txt break.before="1"><defterm guid="_495c7876-654f-48b3-a19e-9be80e83cf21" id="sch-def.approval" type="definition">approval</defterm>, for <intref check="valid" refid="ch.8A" target.guid="_7c2636c7-59ac-4241-be5c-684e0ad0e559">chapter 8A</intref>, see <intref check="valid" refid="sec.173R" target.guid="_58d74e1a-d2f6-4bda-bbb5-c9440c3fb19c">section 173R</intref><intref check="valid" refid="sec.173R-ssec.1" target.guid="_84d316c5-9821-4a36-a43c-0308e8575338">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_cce8bab9-5c27-4362-9750-00d57d16ec15" id="sch-def.approvedform_"><txt break.before="1"><defterm guid="_14e86d46-1673-48bb-ae18-c0d7958dbb4b" id="sch-def.approvedform" type="definition">approved form</defterm> means a form approved by the chief executive under <intref check="valid" refid="sec.270" target.guid="_d0313588-0b15-45ec-b835-f7e6a9af4737">section 270</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_fdf07f22-c610-476d-859b-8a142689fb6e" id="sch-def.approvedprogram_"><txt break.before="1"><defterm guid="_2fd3f640-bf15-4366-9e17-abd250110a14" id="sch-def.approvedprogram" type="definition">approved program</defterm> see <intref check="valid" refid="sec.86" target.guid="_949d5d58-559e-4099-9f0b-2e741b5219cb">section 86</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_a79392b9-8421-4ab5-bc92-082603d87608" id="sch-def.AS4736_"><txt break.before="1"><defterm guid="_dc68f5ed-ba80-493e-84b0-257f00981b25" id="sch-def.AS4736" type="definition">AS 4736</defterm>, for chapter 4, part 3AA, see section 99GB.</txt></definition><definition affected.by.uncommenced="0" guid="_edd6fde3-d24d-4382-8a8a-3e80264c800a" id="sch-def.AS5810_"><txt break.before="1"><defterm guid="_8e9b642f-778a-40ae-82b1-ed0077c2bf14" id="sch-def.AS5810" type="definition">AS 5810</defterm>, for chapter 4, part 3AA, see section 99GB.</txt></definition><definition affected.by.uncommenced="0" guid="_d1da84ac-3fa8-42c5-9f1e-8bd10eafe227" id="sch-def.authorisedperson_"><txt break.before="1"><defterm guid="_4dccceab-f822-47c3-99c0-b7c001f16e3b" id="sch-def.authorisedperson" type="definition">authorised person</defterm> means a person holding office as an authorised person under an appointment under <intref check="valid" refid="sec.183" target.guid="_1f4c9ac4-6b2d-48ba-9c8c-dcb73e1a9212">section 183</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_7c947f7b-5b6d-44a0-ae8c-92910fad7ad3" id="sch-def.baddebtcredit_"><txt break.before="1"><defterm guid="_28670001-978e-41f2-ae16-a92143f6fc14" id="sch-def.baddebtcredit" type="definition">bad debt credit</defterm>, for <intref check="valid" refid="ch.3" target.guid="_9d174c0e-d3d4-4fcd-b62c-7b3babd007b7">chapter 3</intref>, see <intref check="valid" refid="sec.72K" target.guid="_495ed80c-7789-4629-b81a-9e5c758c095f">section 72K</intref><intref check="valid" refid="sec.72K-ssec.1" target.guid="_11308217-c1df-402d-9398-4240d743504e">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_4377d35a-4ee0-473f-bc15-167ef76a72c8" id="sch-def.baddebtcreditapplication_"><txt break.before="1"><defterm guid="_e3191a7c-60e5-4d99-a85e-d2082c0b9637" id="sch-def.baddebtcreditapplication" type="definition">bad debt credit application</defterm>, for <intref check="valid" refid="ch.3" target.guid="_9d174c0e-d3d4-4fcd-b62c-7b3babd007b7">chapter 3</intref>, see <intref check="valid" refid="sec.26" target.guid="_5010083a-a6a1-4327-8946-4fe72cdbaedc">section 26</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_5fe342e3-a7a6-4e38-9344-580b55a28229" id="sch-def.bannedplasticshoppingbag_"><txt break.before="1"><defterm guid="_c1f3aa6d-7cce-4f96-8284-88234e34b83c" id="sch-def.bannedplasticshoppingbag" type="definition">banned plastic shopping bag</defterm> see <intref check="valid" refid="sec.99B" target.guid="_b670feba-5739-4c23-a2dd-3efd56ae3be0">section 99B</intref><intref check="valid" refid="sec.99B-ssec.1" target.guid="_bbc1f641-b747-4935-9247-9a9eedd796cf">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_8ad61c36-31aa-49bc-a1d7-879b338540ce" id="sch-def.bannedsingleuseplasticitem_"><txt break.before="1"><defterm guid="_d398382b-93f4-4311-bbee-a628062c4f4d" id="sch-def.bannedsingleuseplasticitem" type="definition">banned single-use plastic item</defterm>, for chapter 4, part 3AA, see section 99GC.</txt></definition><definition affected.by.uncommenced="0" guid="_ac0c889f-c013-4d43-803c-78d5ed6415c4" id="sch-def.beverage_"><txt break.before="1"><defterm guid="_27e0e3fe-e503-48b6-82b3-fca4e0b14138" id="sch-def.beverage" type="definition">beverage</defterm>, for <intref check="valid" refid="ch.4" target.guid="_d097040d-7d09-4509-a319-3458078dbcf6">chapter 4</intref>, <intref check="valid" refid="ch.4-pt.3B" target.guid="_966a4f59-9a4a-4284-944b-1b3cc55c7b8c">part 3B</intref>, see <intref check="valid" refid="sec.99L" target.guid="_5367545a-9e1a-41d9-be86-a8dcc7b2d9ec">section 99L</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_dfc8c2a4-f803-4911-a06c-b1d7d47f31b2" id="sch-def.beverageproduct_"><txt break.before="1"><defterm guid="_401303b7-d3c8-4a5d-ae0c-0d127b2dc92f" id="sch-def.beverageproduct" type="definition">beverage product</defterm>, for <intref check="valid" refid="ch.4" target.guid="_d097040d-7d09-4509-a319-3458078dbcf6">chapter 4</intref>, <intref check="valid" refid="ch.4-pt.3B" target.guid="_966a4f59-9a4a-4284-944b-1b3cc55c7b8c">part 3B</intref>, see <intref check="valid" refid="sec.99N" target.guid="_2759e633-4c4c-430d-8495-752aaa1d4d05">section 99N</intref><intref check="valid" refid="sec.99N-ssec.1" target.guid="_9fc0f991-a71d-418a-9075-084e9830660a">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_b7e45338-17fb-444c-bef9-67c6f0793550" id="sch-def.businessassociate_"><txt break.before="1"><defterm guid="_adee97b6-d774-40e4-83b3-553de2321b12" id="sch-def.businessassociate" type="definition">business associate</defterm>, of a corporation—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f7998b10-d612-4cb6-b700-ffaef9e843b8" id="sch-def.businessassociate-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ae13d2f8-a060-4284-91fa-2d9922a6cd1c" id="sch-def.businessassociate-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a member or shareholder of the corporation; or</txt></block></li><li guid="_51304135-e63d-43d4-8fe8-e08de131cca6" id="sch-def.businessassociate-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a person who otherwise holds a beneficial interest in the corporation; or</txt></block></li><li guid="_a28a69d0-587d-4201-be90-a3b462ce2d57" id="sch-def.businessassociate-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">another person whom the chief executive believes is associated with the ownership or management of the corporation or is in a position to control or influence the affairs of the corporation; but</txt></block></li></list></block></li><li guid="_7cc54e31-4e03-4fb6-99e8-fce2f009891f" id="sch-def.businessassociate-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">does not include an executive officer of the corporation.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_3fe1db09-8e3d-4659-b99f-cd2b37382792" id="sch-def.businessdays_"><txt break.before="1"><defterm guid="_aa53fe37-3eea-4d5c-b6b3-47ba15a91988" id="sch-def.businessdays" type="definition">business days</defterm> does not include a business day that occurs during the period starting on 20 December in a year and ending on 5 January in the following year.</txt></definition><definition affected.by.uncommenced="0" guid="_cb079627-cf01-4dfb-90b8-d262f578eb98" id="sch-def.chiefexecutiveofficer_"><txt break.before="1"><defterm guid="_a4197e14-f3f4-4af4-b8c3-db034250caac" id="sch-def.chiefexecutiveofficer" type="definition">chief executive officer</defterm>, of a State entity, see <intref check="valid" refid="sec.132" target.guid="_47792c0f-8d54-463b-8577-64c4fafdf3a6">section 132</intref>.</txt></definition><definition affected.by.uncommenced="0" change="ins" guid="_7389e307-4849-44d0-8975-807d154d495f" id="sch-def.circulareconomy_"><txt break.before="1"><defterm guid="_07fbaf21-f046-4b32-abdd-05dbd5fc3552" id="sch-def.circulareconomy" type="definition">circular economy</defterm> see section 9A(3).</txt></definition><definition affected.by.uncommenced="0" change="ins" guid="_d568058d-dc55-40cc-ac28-933ece32d090" id="sch-def.circulareconomyprinciple_"><txt break.before="1"><defterm guid="_0c9a2fed-22ff-4d98-9a26-52844397d013" id="sch-def.circulareconomyprinciple" type="definition">circular economy principle</defterm> see section 9A(1).</txt></definition><definition affected.by.uncommenced="0" change="del" guid="_2461ac35-9817-40f1-b346-58f5872f42b2-del" id="sch-def.cleanearth_-del"><txt break.before="1"><defterm guid="_da50c74e-168a-447d-a64e-ab437715293f-del" id="sch-def.cleanearth-del" type="definition">clean earth</defterm>— </txt><list number.type="manual" unnumbered.indent="0"><li guid="_4d037d95-c669-49cf-98bc-f9dda555cfae-del" id="sch-def.cleanearth-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">means earth that is not contaminated with waste or otherwise contaminated with a hazardous contaminant; but</txt></block></li><li guid="_445d5481-9e5e-4a3d-bcd2-78e82378fc78-del" id="sch-def.cleanearth-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">does not include acid sulphate soil, other than acid sulphate soil that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c651d9e9-82b7-4a9b-9a90-c4e6d5bd98a6-del" id="sch-def.cleanearth-para1.b-para2.i-del" provision.type="other"><no>(i)</no><block><txt break.before="0">is not contaminated with waste, or otherwise contaminated with a hazardous contaminant, other than naturally occurring iron sulphides that produce sulphuric acid when exposed to air; and</txt></block></li><li guid="_ef9847b4-e34e-40b4-bb33-7ea0205f0ef6-del" id="sch-def.cleanearth-para1.b-para2.ii-del" provision.type="other"><no>(ii)</no><block><txt break.before="0">has been treated in accordance with best practice environmental management, within the meaning of the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act"><name emphasis="no">Environmental Protection Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.21" target.doc.id="act-1994-062" target.guid="_b5051acc-e257-440c-9a5d-22bab9b86068" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act">section 21</legref>, for the treatment and management of acid sulfate soils, as stated in a guideline prescribed by regulation.</txt></block></li></list></block></li></list></definition><definition affected.by.uncommenced="0" guid="_4deadf4f-2bcb-46ed-ab9f-35276601b3c2" id="sch-def.commencement_"><txt break.before="1"><defterm guid="_2779f8f2-b428-4029-ad87-28c801f7c2cc" id="sch-def.commencement" type="definition">commencement</defterm>, for <intref check="valid" refid="ch.15" target.guid="_e29e6029-0de7-4179-b4b5-dc009e83ff1d">chapter 15</intref>, <intref check="valid" refid="ch.15-pt.1" target.guid="_cb874e86-2711-4689-b761-86215eb8de6d">part 1</intref>, see <intref check="valid" refid="sec.272" target.guid="_38e8727a-e306-4872-81a5-355f4db74840">section 272</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_aa124492-669e-4d8f-a062-b179fc6fe744" id="sch-def.commercialandindustrialwaste_"><txt break.before="1"><defterm guid="_90277dd8-0a2f-4424-85e9-3844728a4738" id="sch-def.commercialandindustrialwaste" type="definition">commercial and industrial waste</defterm> means waste that is prescribed under a regulation as commercial and industrial waste.</txt></definition><definition affected.by.uncommenced="0" guid="_1b3bf83d-e991-44c4-98cd-3811bbc6fac9" id="sch-def.compliancenotice_"><txt break.before="1"><defterm guid="_16aefec5-ebe1-4720-92c9-04f75f2bbfb9" id="sch-def.compliancenotice" type="definition">compliance notice</defterm>, for <intref check="valid" refid="ch.11" target.guid="_e6645484-8c0c-4512-9bf9-7a0ca2fe74f1">chapter 11</intref>, see <intref check="valid" refid="sec.248" target.guid="_5569ad89-ef45-48f4-b562-b3a4aea9387b">section 248</intref><intref check="valid" refid="sec.248-ssec.1" target.guid="_cf1943c9-2b4b-4595-b11e-136c9f63dcf6">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_9ccb4a8e-fb3a-4e7e-8a9f-45b816f8c9bf" id="sch-def.compostable_"><txt break.before="1"><defterm guid="_80755c1d-0b21-453b-9baf-08d2e7370a2c" id="sch-def.compostable" type="definition">compostable</defterm>, for a plastic item, for chapter 4, part 3AA, see section 99GB.</txt></definition><definition affected.by.uncommenced="0" guid="_8db60800-5e54-42a9-a6da-39dae3e08bfb" id="sch-def.container_"><txt break.before="1"><defterm guid="_3c69ab59-aa2a-4400-897d-937431a6e570" id="sch-def.container" type="definition">container</defterm>, for <intref check="valid" refid="ch.4" target.guid="_d097040d-7d09-4509-a319-3458078dbcf6">chapter 4</intref>, <intref check="valid" refid="ch.4-pt.3B" target.guid="_966a4f59-9a4a-4284-944b-1b3cc55c7b8c">part 3B</intref>, see <intref check="valid" refid="sec.99M" target.guid="_dbfc271a-09de-49f8-a414-a75132833a31">section 99M</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_76873eb5-7c4b-47e4-a9d9-59a7d37a3182" id="sch-def.containerapproval_"><txt break.before="1"><defterm guid="_7804236e-bf03-4a40-b9d1-9298d334ee18" id="sch-def.containerapproval" type="definition">container approval</defterm>, for a beverage product, for <intref check="valid" refid="ch.4" target.guid="_d097040d-7d09-4509-a319-3458078dbcf6">chapter 4</intref>, <intref check="valid" refid="ch.4-pt.3B" target.guid="_966a4f59-9a4a-4284-944b-1b3cc55c7b8c">part 3B</intref>, see <intref check="valid" refid="sec.99ZN" target.guid="_7e7c5b98-ba6b-4579-a122-bde8eb35f0e9">section 99ZN</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_401f967b-30b9-4ce1-837d-59118bf97ecb" id="sch-def.containercollectionagreement_"><txt break.before="1"><defterm guid="_ed5e9e3d-06a8-4373-a0fb-beba8594bcb8" id="sch-def.containercollectionagreement" type="definition">container collection agreement</defterm> see <intref check="valid" refid="sec.99ZA" target.guid="_cb8d5a5d-e58b-4067-9dd0-7f33c9c26848">section 99ZA</intref><intref check="valid" refid="sec.99ZA-ssec.1" target.guid="_347ffa6d-0829-4abe-a7ab-8d399f0e2f78">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_314bd562-aede-4ce7-a323-d4534b2828ef" id="sch-def.containerrecoveryagreement_"><txt break.before="1"><defterm guid="_77284c40-581e-43c5-8d16-1396fc88d455" id="sch-def.containerrecoveryagreement" type="definition">container recovery agreement</defterm> see <intref check="valid" refid="sec.99Q" target.guid="_0401784c-4961-40ee-a048-bb61424f111b">section 99Q</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_e3293e42-4768-4100-a3b2-59ec7677d064" id="sch-def.containerrefundpoint_"><txt break.before="1"><defterm guid="_5fe1ba36-c5cb-4a76-a35d-b3a504cf2eb8" id="sch-def.containerrefundpoint" type="definition">container refund point</defterm> see <intref check="valid" refid="sec.99K" target.guid="_23445d2e-ee94-474c-8107-0fd8e715f37e">section 99K</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_9f9d4e89-052e-4368-901d-9784d045c315" id="sch-def.containerrefundscheme_"><txt break.before="1"><defterm guid="_ea0370a8-0fd3-4290-b426-6bc06de9ec57" id="sch-def.containerrefundscheme" type="definition">container refund scheme</defterm> means the container refund scheme established under <intref check="valid" refid="ch.4" target.guid="_d097040d-7d09-4509-a319-3458078dbcf6">chapter 4</intref>, <intref check="valid" refid="ch.4-pt.3B" target.guid="_966a4f59-9a4a-4284-944b-1b3cc55c7b8c">part 3B</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_2d57e6e8-f9f3-49fa-81c7-47f06962f098" id="sch-def.contaminatedlandregister_"><txt break.before="1"><defterm guid="_4339f581-6dbd-4c26-9efb-fb95c949395c" id="sch-def.contaminatedlandregister" type="definition">contaminated land register</defterm> see the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Environmental Protection Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sch.4" target.doc.id="act-1994-062" target.guid="_4ac3dc5c-9343-4b1e-ab22-39ea516411fe" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act">schedule 4</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_7e0f141c-2727-4c5e-ab94-7951c43230ab" id="sch-def.controlledwasteNEPM_"><txt break.before="1"><defterm guid="_1fc05389-98fc-4979-b015-beb31088efab" id="sch-def.controlledwasteNEPM" type="definition">controlled waste NEPM</defterm> means the National Environment Protection (Movement of Controlled Waste between States and Territories) Measure, made by the National Environment Protection Council under the <legref check="invalid" jurisd="CTH" type="act"><name emphasis="yes">National Environment Protection Council Act 1994</name> (Cwlth)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_e0ab54ef-af50-4a38-a240-5001ba29e843" id="sch-def.conviction_"><txt break.before="1"><defterm guid="_3576dcba-b809-43fc-a44a-293395c22298" id="sch-def.conviction" type="definition">conviction</defterm> includes a finding of guilt or the acceptance of a plea of guilty by a court, whether or not a conviction is recorded.</txt></definition><definition affected.by.uncommenced="0" guid="_99c72f61-e52d-4435-ba28-848b97b30c1a" id="sch-def.correspondingjurisdiction_"><txt break.before="1"><defterm guid="_6fa2b11a-1aee-451f-8338-cd6c8ede2a27" id="sch-def.correspondingjurisdiction" type="definition">corresponding jurisdiction</defterm> means a jurisdiction in which a corresponding law is in force.</txt></definition><definition affected.by.uncommenced="0" guid="_cc34ac13-c1cb-4173-b6b4-4820c8319e7e" id="sch-def.correspondinglaw_"><txt break.before="1"><defterm guid="_dbdf37d8-bd7e-4908-9b14-c9648e77b6d4" id="sch-def.correspondinglaw" type="definition">corresponding law</defterm> means a law of another jurisdiction that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_575b59bb-9319-4bc4-9d6a-7b186ad8b2d9" id="sch-def.correspondinglaw-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">establishes a corresponding scheme; and</txt></block></li><li guid="_290da761-a259-4e95-85ed-97a49ffd4352" id="sch-def.correspondinglaw-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is prescribed by regulation for this definition.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_5c017797-38e3-4bca-86d3-0b69126159bb" id="sch-def.correspondingscheme_"><txt break.before="1"><defterm guid="_e2f0cade-7e32-48ad-b309-b24d468bf3fa" id="sch-def.correspondingscheme" type="definition">corresponding scheme</defterm> means a scheme established under a law of another jurisdiction that, for that jurisdiction—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_66c447f3-9649-48bf-bbc2-1e11b1172ccd" id="sch-def.correspondingscheme-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">regulates the supply of beverages in containers; and</txt></block></li><li guid="_b3ab995c-3b72-46ef-971c-ce3f726c33a8" id="sch-def.correspondingscheme-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">provides for a refund to be paid for the return of empty beverage containers to a particular person or place.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_dd13880e-fcef-4bd7-8ca8-8346f318ef32" id="sch-def.criminalhistory_"><txt break.before="1"><defterm guid="_2fa2c7bf-27bf-4970-a65f-2333929e4a8f" id="sch-def.criminalhistory" type="definition">criminal history</defterm>, of a person, means the person’s criminal history within the meaning of the <legref check="valid" jurisd="QLD" target.doc.id="act-1986-020" target.version.series="591f88fd-8a19-4573-8e3f-8c58be43de4d" type="act"><name emphasis="yes">Criminal Law (Rehabilitation of Offenders) Act 1986</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_69afb278-7628-42b4-9672-56ba971037e7" id="sch-def.deliverto_"><txt break.before="1"><defterm guid="_194e757b-fbbd-4ca1-a659-a874d7bc8639" id="sch-def.deliverto" type="definition">deliver to</defterm> includes deposit at.</txt></definition><definition affected.by.uncommenced="0" guid="_e30564a8-6721-452b-b0ac-1f05c0df1d21" id="sch-def.deposit_"><txt break.before="1"><defterm guid="_94c85adb-113d-43ab-8a55-ad0bc9e0209e" id="sch-def.deposit" type="definition">deposit</defterm>, waste, at a place, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c747b0c9-c3be-4dee-8b17-fcc38f6114ba" id="sch-def.deposit-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">throw, drop or otherwise put the waste at, in or on the place; or</txt></block></li><li guid="_68f16335-8077-41cb-a6b5-5083c562273e" id="sch-def.deposit-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">leave the waste at, in or on the place; or</txt></block></li><li guid="_2418591f-dbe6-4528-9da0-cd24670460a5" id="sch-def.deposit-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">deal with the waste in a way that causes or allows it to fall, blow, wash or otherwise escape onto the place; or</txt><note guid="_4e0bce17-eb4b-4fd5-9751-3d632ffd82aa" id="sch-def.deposit-para1.c-note" type="example"><heading guid="_fc398e5a-34d9-45fd-bb57-964b876fe554" id="sch-def.deposit-para1.c-note-he">Examples for <intref check="valid" refid="sch-def.deposit-para1.c" target.guid="_2418591f-dbe6-4528-9da0-cd24670460a5">paragraph (c)</intref>—</heading><block><txt break.before="1">A person transports waste in a trailer on a road in a way that causes the waste to be blown out of the trailer and onto the road, or leaves waste on private land where it is then washed by rain onto a road.</txt></block></note></block></li><li guid="_b5e42e1e-d963-47b1-83b5-5c878e72c949" id="sch-def.deposit-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">dispose of the waste to landfill at the place.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_b5d302cd-83af-4a49-bd9f-c6dc3cbdf424" id="sch-def.disaster_"><txt break.before="1"><defterm guid="_14be43bc-4639-4231-9c32-4ef59cf59614" id="sch-def.disaster" type="definition">disaster</defterm>, for <intref check="valid" refid="ch.3" target.guid="_9d174c0e-d3d4-4fcd-b62c-7b3babd007b7">chapter 3</intref>, see <intref check="valid" refid="sec.26" target.guid="_5010083a-a6a1-4327-8946-4fe72cdbaedc">section 26</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_03e63a10-31c8-4eb4-9614-2efc874de56c" id="sch-def.disastermanagementwaste_"><txt break.before="1"><defterm guid="_44a656b1-56fc-4fc2-817a-a86ba8d6df0a" id="sch-def.disastermanagementwaste" type="definition">disaster management waste</defterm>, for <intref check="valid" refid="ch.3" target.guid="_9d174c0e-d3d4-4fcd-b62c-7b3babd007b7">chapter 3</intref>, see <intref check="valid" refid="sec.26" target.guid="_5010083a-a6a1-4327-8946-4fe72cdbaedc">section 26</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_5a85a196-1287-4adc-a01b-fb2f1cdf6162" id="sch-def.disastersituation_"><txt break.before="1"><defterm guid="_c7b3fa54-4479-45f5-9f65-058b805b60cc" id="sch-def.disastersituation" type="definition">disaster situation</defterm>, for <intref check="valid" refid="ch.3" target.guid="_9d174c0e-d3d4-4fcd-b62c-7b3babd007b7">chapter 3</intref>, see <intref check="valid" refid="sec.26" target.guid="_5010083a-a6a1-4327-8946-4fe72cdbaedc">section 26</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_db8be37e-1b89-4caa-8885-cd466c706376" id="sch-def.discountedrate_"><txt break.before="1"><defterm guid="_413da286-69a6-4fb7-a443-3f5442c2c3a2" id="sch-def.discountedrate" type="definition">discounted rate</defterm>, for the waste levy for residue waste, see <intref check="valid" refid="sec.44" target.guid="_3ebbfc62-487a-4486-bc2a-97aeedf20ab6">section 44</intref><intref check="valid" refid="sec.44-ssec.4" target.guid="_08d7026d-913d-4eaf-8f41-bbec6284d604">(4)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_8d93ec95-83c4-4648-9709-1808fd27653f" id="sch-def.disposal_"><txt break.before="1"><defterm guid="_a78726de-7a0c-4fc2-aa40-f661aa28c7ec" id="sch-def.disposal" type="definition">disposal</defterm>, in relation to waste, see <intref check="valid" refid="sec.8" target.guid="_7601e4e4-c3b0-4253-bd29-e32c31726222">section 8</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_e0190b0b-9cdd-4be2-880e-92b9ac986ad4" id="sch-def.disposalbanwaste_"><txt break.before="1"><defterm guid="_d0bf30d4-5c4f-4b24-bbcf-1674c2559fc8" id="sch-def.disposalbanwaste" type="definition">disposal ban waste</defterm> see <intref check="valid" refid="sec.100" target.guid="_0c056a98-dfe3-457a-b1f0-ad6778604f22">section 100</intref><intref check="valid" refid="sec.100-ssec.4" target.guid="_f9b3e9d2-bf81-4c1e-8f6a-e90350469767">(4)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_5fb8d5fa-545f-491e-acac-56b8c306a4e8" id="sch-def.disposalorder_"><txt break.before="1"><defterm guid="_f62c6d41-5737-4d75-bc57-16c628e493b5" id="sch-def.disposalorder" type="definition">disposal order</defterm>, for <intref check="valid" refid="ch.10" target.guid="_09fa7a87-ea51-4658-95bd-97bd9fce9027">chapter 10</intref>, see <intref check="valid" refid="sec.231" target.guid="_ac8d809c-13dc-4764-8be0-f2cfd3e63e87">section 231</intref><intref check="valid" refid="sec.231-ssec.2" target.guid="_076ba3f6-54d4-47de-8ed3-f70e3f564ac3">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_5a27d37d-723e-496b-8d25-c0e223b41a31" id="sch-def.document_"><txt break.before="1"><defterm guid="_94ec3183-7c5f-4208-8962-aae3e82b00a8" id="sch-def.document" type="definition">document</defterm>, required to be kept under this Act, includes any record or return required to be kept under this Act.</txt></definition><definition affected.by.uncommenced="0" guid="_b6292aa7-6067-4bf9-b11f-d1930b4d044f" id="sch-def.documentcertificationrequirement_"><txt break.before="1"><defterm guid="_969252eb-0e30-4c97-b6b1-7163b0830b6c" id="sch-def.documentcertificationrequirement" type="definition">document certification requirement</defterm>, for <intref check="valid" refid="ch.10" target.guid="_09fa7a87-ea51-4658-95bd-97bd9fce9027">chapter 10</intref>, see <intref check="valid" refid="sec.234" target.guid="_3d7d3070-4795-44f3-a13d-044c7151c49e">section 234</intref><intref check="valid" refid="sec.234-ssec.6" target.guid="_2481fa86-660c-4f99-9197-25306a5c2ff9">(6)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_c0a64289-c98e-4c3c-b41f-6ef4925c7861" id="sch-def.documentproductionrequirement_"><txt break.before="1"><defterm guid="_1bc74687-4c19-4667-a35e-f60405e527ee" id="sch-def.documentproductionrequirement" type="definition">document production requirement</defterm>, for <intref check="valid" refid="ch.10" target.guid="_09fa7a87-ea51-4658-95bd-97bd9fce9027">chapter 10</intref>, see <intref check="valid" refid="sec.234" target.guid="_3d7d3070-4795-44f3-a13d-044c7151c49e">section 234</intref><intref check="valid" refid="sec.234-ssec.2" target.guid="_8cf4a172-34c9-4ed1-8483-05d22d18007a">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_5ef156c1-1cfd-4df1-8c2a-de4b598f28ad" id="sch-def.domesticpremises_"><txt break.before="1"><defterm guid="_bc5a417f-2cd4-421d-8a49-49a553e0e27f" id="sch-def.domesticpremises" type="definition">domestic premises</defterm> means either—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_08641410-7a64-4ae4-b13c-6528b102b750" id="sch-def.domesticpremises-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a single unit private dwelling; or</txt></block></li><li guid="_ad73e026-a961-40a6-b897-0d7a805ac797" id="sch-def.domesticpremises-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">premises containing 2 or more separate flats, apartments or other dwelling units.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_06cd37f0-b24a-4237-a5d4-921845034def" id="sch-def.dredgespoil_"><txt break.before="1"><defterm guid="_ee26e6f9-1fd8-4343-84c2-528d8dcdcd42" id="sch-def.dredgespoil" type="definition">dredge spoil</defterm>, for <intref check="valid" refid="ch.3" target.guid="_9d174c0e-d3d4-4fcd-b62c-7b3babd007b7">chapter 3</intref>, see <intref check="valid" refid="sec.26" target.guid="_5010083a-a6a1-4327-8946-4fe72cdbaedc">section 26</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_2786dd15-efe5-493c-b85c-0ffe034948b4" id="sch-def.duedateforpayment_"><txt break.before="1"><defterm guid="_1f7a82d2-3bf8-40cc-b040-4845f253ff55" id="sch-def.duedateforpayment" type="definition">due date for payment</defterm>, of a waste levy amount, for <intref check="valid" refid="ch.3" target.guid="_9d174c0e-d3d4-4fcd-b62c-7b3babd007b7">chapter 3</intref>, see <intref check="valid" refid="sec.26" target.guid="_5010083a-a6a1-4327-8946-4fe72cdbaedc">section 26</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_687534ca-8879-436f-a1ac-c9ebe88b5dcc" id="sch-def.earth_"><txt break.before="1"><defterm guid="_163a0ad3-3353-4ca2-a22f-0ead63714064" id="sch-def.earth" type="definition">earth</defterm> means natural materials such as clay, gravel, sand, soil and rock.</txt></definition><definition affected.by.uncommenced="0" guid="_123021f2-c8c7-4875-ab52-6e073de993c2" id="sch-def.electronicdocument_"><txt break.before="1"><defterm guid="_099d2d5c-bc1b-493a-850d-6663da50cbfe" id="sch-def.electronicdocument" type="definition">electronic document</defterm>, for <intref check="valid" refid="ch.10" target.guid="_09fa7a87-ea51-4658-95bd-97bd9fce9027">chapter 10</intref>, see <intref check="valid" refid="sec.181" target.guid="_05db7fe2-0cb0-42f6-a6e2-f72f622036f8">section 181</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_51b9575c-3cee-4a17-b430-ba7d5c3fecef" id="sch-def.eligiblecompany_"><txt break.before="1"><defterm guid="_a2325748-32c3-465f-a071-9b05a6e9c482" id="sch-def.eligiblecompany" type="definition">eligible company</defterm>, for <intref check="valid" refid="ch.4" target.guid="_d097040d-7d09-4509-a319-3458078dbcf6">chapter 4</intref>, <intref check="valid" refid="ch.4-pt.5" target.guid="_f76bac62-fb51-496d-9f22-9cbcfa27127c">part 5</intref>, see <intref check="valid" refid="sec.102B" target.guid="_aef67fde-2881-4048-b064-2d7a4ab25d9c">section 102B</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_02e22475-76f8-41c2-884f-7a4bf8c16321" id="sch-def.eligibleindividual_"><txt break.before="1"><defterm guid="_37cad5c8-484f-4fd7-9b0e-86eb3ae3c18b" id="sch-def.eligibleindividual" type="definition">eligible individual</defterm> means an individual who—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_485f2a39-7d7f-4c10-9fe3-533d605e2c58" id="sch-def.eligibleindividual-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is not insolvent under administration under the <legref check="invalid" jurisd="CTH" type="act"><name emphasis="no">Corporations Act</name></legref>, <legref check="invalid" jurisd="CTH" refid="sec.9" type="act">section 9</legref>; and</txt></block></li><li guid="_5eff39c6-73a7-49fa-9af6-eb65a4b3dc3b" id="sch-def.eligibleindividual-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is not disqualified from managing corporations, under the <legref check="invalid" jurisd="CTH" type="act"><name emphasis="no">Corporations Act</name></legref>, <legref check="invalid" jurisd="CTH" refid="pt.2D" type="act">part 2D</legref>.6; and</txt></block></li><li guid="_9c5460e7-55d2-4ac6-ada1-4eacb6316152" id="sch-def.eligibleindividual-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">does not have a conviction, other than a spent conviction, for an offence against—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_60364e4b-fe64-4cc9-880c-0b3d374fada3" id="sch-def.eligibleindividual-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">this Act; or</txt></block></li><li guid="_27772cf2-46d4-44df-8377-0ffc426f2199" id="sch-def.eligibleindividual-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a provision of a corresponding law; or</txt></block></li><li guid="_6b0f0176-4efc-4e28-85cc-da6b9aa3cbd7" id="sch-def.eligibleindividual-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">a provision of the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Environmental Protection Act</name></legref> relating to a waste management ERA; and</txt></block></li></list></block></li><li guid="_6d98669d-248a-46b6-a1d6-db3ea816ab49" id="sch-def.eligibleindividual-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">does not have a conviction, other than a spent conviction, for an indictable offence against another law.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_926c42e9-0c31-4fad-888a-4b5ed5feca49" id="sch-def.endofwasteapproval_"><txt break.before="1"><defterm guid="_fae0dd8b-19af-42f3-ab3c-45bd9d068dc5" id="sch-def.endofwasteapproval" type="definition">end of waste approval</defterm>, for <intref check="valid" refid="ch.8" target.guid="_598380ab-31bf-4319-8271-2fc98c9c0cef">chapter 8</intref>, see <intref check="valid" refid="sec.159" target.guid="_537f1b79-14a6-44eb-9cea-ff2a661cc010">section 159</intref><intref check="valid" refid="sec.159-ssec.2" target.guid="_03f84e2c-b35b-4dfd-b8a0-1430c4dc0213">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_a9ea4738-ea8b-4d90-a7cc-e873302e535a" id="sch-def.endofwastecode_"><txt break.before="1"><defterm guid="_e14d3961-9212-434e-91f3-6e60fda82541" id="sch-def.endofwastecode" type="definition">end of waste code</defterm>, for <intref check="valid" refid="ch.8" target.guid="_598380ab-31bf-4319-8271-2fc98c9c0cef">chapter 8</intref>, see <intref check="valid" refid="sec.159" target.guid="_537f1b79-14a6-44eb-9cea-ff2a661cc010">section 159</intref><intref check="valid" refid="sec.159-ssec.1" target.guid="_9f95d179-20b4-43f9-8f13-c7659c484028">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_3bdc132d-e432-4a3e-8d0f-9b17d1c8f0e0" id="sch-def.environmentalauthority_"><txt break.before="1"><defterm guid="_6e012574-e031-4ea8-8fa6-5b3bc8d1cb41" id="sch-def.environmentalauthority" type="definition">environmental authority</defterm> means an environmental authority under the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Environmental Protection Act</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_bf5b2255-6e2a-468e-a831-7c7f68aa940c" id="sch-def.environmentallysignificantcharacteristic_"><txt break.before="1"><defterm guid="_148868b4-9566-4dd5-91d2-d7103ff8cbbc" id="sch-def.environmentallysignificantcharacteristic" type="definition">environmentally significant characteristic</defterm> means a characteristic mentioned in the controlled waste NEPM, schedule A, list 2.</txt></definition><definition affected.by.uncommenced="0" guid="_4b271ab0-a318-4ac0-8f3c-2fb90e70901b" id="sch-def.environmentalmanagementregister_"><txt break.before="1"><defterm guid="_859d9cd9-ab84-44b5-abeb-4250e049fe79" id="sch-def.environmentalmanagementregister" type="definition">environmental management register</defterm> see the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Environmental Protection Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sch.4" target.doc.id="act-1994-062" target.guid="_4ac3dc5c-9343-4b1e-ab22-39ea516411fe" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act">schedule 4</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_8b45d23d-ce1d-44db-a866-58b83c533b0c" id="sch-def.environmentalnuisance_"><txt break.before="1"><defterm guid="_42170772-ebb2-424a-804c-f6de22e3babe" id="sch-def.environmentalnuisance" type="definition">environmental nuisance</defterm> see the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Environmental Protection Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.15" target.doc.id="act-1994-062" target.guid="_42a32fed-b211-4817-b0de-3c91d4609c68" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act">section 15</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_5c20e2f3-cb32-41f2-b79c-27c172401323" id="sch-def.EnvironmentalProtectionAct_"><txt break.before="1"><defterm guid="_fc22f16f-c9e3-4751-a6f6-7752ff7579bd" id="sch-def.EnvironmentalProtectionAct" type="definition">Environmental Protection Act</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d31e4864-de47-441c-aeb3-aa8a2045c7e4" id="sch-def.EnvironmentalProtectionAct-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for <intref check="valid" refid="ch.15" target.guid="_e29e6029-0de7-4179-b4b5-dc009e83ff1d">chapter 15</intref>, <intref check="valid" refid="ch.15-pt.1" target.guid="_cb874e86-2711-4689-b761-86215eb8de6d">part 1</intref>—see <intref check="valid" refid="sec.272" target.guid="_38e8727a-e306-4872-81a5-355f4db74840">section 272</intref>; or</txt></block></li><li guid="_a22cc651-137c-4884-b338-4a82cf6bbc50" id="sch-def.EnvironmentalProtectionAct-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act"><name emphasis="yes">Environmental Protection Act 1994</name></legref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_0a2705e7-77e5-4a5f-bd05-4ffe2bec1281" id="sch-def.executiveofficer_"><txt break.before="1"><defterm guid="_755fe583-7935-4f34-b04f-1ef07ef7794d" id="sch-def.executiveofficer" type="definition">executive officer</defterm>, of a corporation, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6bb17b6c-2166-4996-a2c4-bf1dfd0ef361" id="sch-def.executiveofficer-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the corporation is the Commonwealth or a State—a chief executive of a department of government or a person who is concerned with, or takes part in, the management of a department of government, whatever the person’s position is called; or</txt></block></li><li guid="_3a411cd5-0547-4402-8701-a74617e62b14" id="sch-def.executiveofficer-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if <intref check="valid" refid="sch-def.executiveofficer-para1.a" target.guid="_6bb17b6c-2166-4996-a2c4-bf1dfd0ef361">paragraph (a)</intref> does not apply—a person who is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a3746bc3-9efa-4cb9-a720-2f1204153390" id="sch-def.executiveofficer-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a member of the governing body of the corporation; or</txt></block></li><li guid="_2be2cd57-6909-4817-8c64-00d36896e55e" id="sch-def.executiveofficer-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">concerned with, or takes part in, the corporation’s management;</txt></block></li></list></block><block><txt break.before="1">whatever the person’s position is called and whether or not the person is a director of the corporation.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_302db484-51eb-4fcc-ae2d-5f6419fb3d4d" id="sch-def.exemptwaste_"><txt break.before="1"><defterm guid="_32c4d782-24ce-4adf-8965-317232273b7b" id="sch-def.exemptwaste" type="definition">exempt waste</defterm> see <intref check="valid" refid="sec.26" target.guid="_5010083a-a6a1-4327-8946-4fe72cdbaedc">section 26</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_972120c5-bb67-4a61-8fb7-a9185d72e846" id="sch-def.exemptwasteapplication_"><txt break.before="1"><defterm guid="_0a34b72b-a62b-4cb8-8685-1ccdd85fd276" id="sch-def.exemptwasteapplication" type="definition">exempt waste application</defterm>, for <intref check="valid" refid="ch.3" target.guid="_9d174c0e-d3d4-4fcd-b62c-7b3babd007b7">chapter 3</intref>, see <intref check="valid" refid="sec.26" target.guid="_5010083a-a6a1-4327-8946-4fe72cdbaedc">section 26</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_2890ea9b-5282-4d0b-a4f9-455b86adfe4b" id="sch-def.existingapproval_"><txt break.before="1"><defterm guid="_3e1d15f2-b6ca-43cf-be03-559d6c2e6105" id="sch-def.existingapproval" type="definition">existing approval</defterm>, for <intref check="valid" refid="ch.15" target.guid="_e29e6029-0de7-4179-b4b5-dc009e83ff1d">chapter 15</intref>, <intref check="valid" refid="ch.15-pt.1" target.guid="_cb874e86-2711-4689-b761-86215eb8de6d">part 1</intref>, see <intref check="valid" refid="sec.272" target.guid="_38e8727a-e306-4872-81a5-355f4db74840">section 272</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_8b6a8e0c-d4d0-49db-85d0-95a1f1380cd9" id="sch-def.existinggeneralapproval_"><txt break.before="1"><defterm guid="_f23433fc-e5c6-4f4b-839d-72e04ab937b4" id="sch-def.existinggeneralapproval" type="definition">existing general approval</defterm>, for <intref check="valid" refid="ch.15" target.guid="_e29e6029-0de7-4179-b4b5-dc009e83ff1d">chapter 15</intref>, <intref check="valid" refid="ch.15-pt.1" target.guid="_cb874e86-2711-4689-b761-86215eb8de6d">part 1</intref>, see <intref check="valid" refid="sec.272" target.guid="_38e8727a-e306-4872-81a5-355f4db74840">section 272</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_53ba8b91-d97d-4eec-9b71-a1e3620d20d7" id="sch-def.existingspecificapproval_"><txt break.before="1"><defterm guid="_ebecf26a-2fee-46d2-a5c8-9fa7a970f785" id="sch-def.existingspecificapproval" type="definition">existing specific approval</defterm>, for <intref check="valid" refid="ch.15" target.guid="_e29e6029-0de7-4179-b4b5-dc009e83ff1d">chapter 15</intref>, <intref check="valid" refid="ch.15-pt.1" target.guid="_cb874e86-2711-4689-b761-86215eb8de6d">part 1</intref>, see <intref check="valid" refid="sec.272" target.guid="_38e8727a-e306-4872-81a5-355f4db74840">section 272</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_96a14678-d468-42d9-9d6c-e1b98bcddba6" id="sch-def.externalreview_"><txt break.before="1"><defterm guid="_6d090806-af15-462a-80ea-50395cb3d14b" id="sch-def.externalreview" type="definition">external review</defterm>, for a decision, means a review of the decision by QCAT under the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">QCAT Act</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_07eafefd-6d5b-4763-b18e-f21e9506eeb4" id="sch-def.extraordinarycircumstancesexemption_"><txt break.before="1"><defterm guid="_69dd0760-35e7-4443-bbb8-051464a8dec1" id="sch-def.extraordinarycircumstancesexemption" type="definition">extraordinary circumstances exemption</defterm> see <intref check="valid" refid="sec.99ZY" target.guid="_b4d1a6a6-a697-42d1-a1bc-476371e55f3e">section 99ZY</intref><intref check="valid" refid="sec.99ZY-ssec.2" target.guid="_fcb1f25d-6213-42f0-93bb-4dcede99f86c">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_77b6749f-8ce5-4513-a0ef-016714effa01" id="sch-def.feedstock_"><txt break.before="1"><defterm guid="_9108b5c0-ff18-4196-8652-f65b5d776c31" id="sch-def.feedstock" type="definition">feedstock</defterm>, for a recycling activity, for <intref check="valid" refid="ch.3" target.guid="_9d174c0e-d3d4-4fcd-b62c-7b3babd007b7">chapter 3</intref>, see <intref check="valid" refid="sec.26" target.guid="_5010083a-a6a1-4327-8946-4fe72cdbaedc">section 26</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_bc8b9192-730d-4afd-9e24-ac6cb7b246c1" id="sch-def.finalreviewreport_"><txt break.before="1"><defterm guid="_47f1a80e-4bb6-4392-8a79-9669757953b8" id="sch-def.finalreviewreport" type="definition">final review report</defterm> see <intref check="valid" refid="sec.22" target.guid="_a46e1864-411e-4a17-a5f6-2641f308137e">section 22</intref><intref check="valid" refid="sec.22-ssec.1" target.guid="_3e4ccd87-4fcc-4e15-ab31-75e3f055eb30">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_8322c9e3-afdc-4c6c-b5fc-f5a7e84af8d2" id="sch-def.forfeitureorder_"><txt break.before="1"><defterm guid="_8f3a33c6-3f7c-4c1a-80c0-0efe30ec9bb7" id="sch-def.forfeitureorder" type="definition">forfeiture order</defterm>, for <intref check="valid" refid="ch.10" target.guid="_09fa7a87-ea51-4658-95bd-97bd9fce9027">chapter 10</intref>, see <intref check="valid" refid="sec.227" target.guid="_0b967d2c-8acb-46fa-9c9b-7f7b347ea5d9">section 227</intref><intref check="valid" refid="sec.227-ssec.1" target.guid="_3b328e4a-b50b-47a3-9aec-d9db2a4de8e3">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_a31985fd-7815-4050-aaf9-13d98ecc099d" id="sch-def.formerowner_"><txt break.before="1"><defterm guid="_5db0fc18-45d9-4fd2-bf5b-32330bd20a08" id="sch-def.formerowner" type="definition">former owner</defterm>, for <intref check="valid" refid="ch.10" target.guid="_09fa7a87-ea51-4658-95bd-97bd9fce9027">chapter 10</intref>, see <intref check="valid" refid="sec.226" target.guid="_0ff4a4cb-5e74-4574-bf03-89ab4e4620a7">section 226</intref><intref check="valid" refid="sec.226-ssec.1" target.guid="_44593fde-1991-4520-942a-04b1e3b280bb">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_8fe23ba8-e153-44c4-8000-86dd6bbb2c03" id="sch-def.friableasbestoscontainingmaterial_"><txt break.before="1"><defterm guid="_d754b4d2-5cda-4afa-9648-dae2fec4cf4a" id="sch-def.friableasbestoscontainingmaterial" type="definition">friable asbestos-containing material</defterm>, for <intref check="valid" refid="ch.3" target.guid="_9d174c0e-d3d4-4fcd-b62c-7b3babd007b7">chapter 3</intref>, see <intref check="valid" refid="sec.26" target.guid="_5010083a-a6a1-4327-8946-4fe72cdbaedc">section 26</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_e501e618-f1d4-4ce6-8e88-12f277cf226d" id="sch-def.GCM_"><txt break.before="1"><defterm guid="_105ee50b-4363-474d-9ce3-55e462c5d234" id="sch-def.GCM" type="definition">GCM</defterm> see the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="yes">Transport Operations (Road Use Management—Vehicle Registration) Regulation 2021</name></legref>, <legref check="valid" jurisd="QLD" refid="sch.8" target.doc.id="sl-2010-0191" target.guid="_1b4605fd-1e05-4fe0-a567-fe985caee5fa" target.version.series="11d374b1-ffd9-4107-9fd9-5fbd297ce438" type="subordleg">schedule 8</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_2de27f04-c7a7-41b3-bc27-cf0854c89c4a" id="sch-def.generallitteringprovision_"><txt break.before="1"><defterm guid="_12a3cd8e-0c05-49c6-9aab-f10323a5f769" id="sch-def.generallitteringprovision" type="definition">general littering provision</defterm> means <intref check="valid" refid="sec.103" target.guid="_88ee3b31-e48a-4927-89f5-5ffb72f072b6">section 103</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_7f8175fb-1230-447a-aa92-3bb771698d6c" id="sch-def.generalpower_"><txt break.before="1"><defterm guid="_fddb6048-e7a3-4406-a94d-405bfe07bd98" id="sch-def.generalpower" type="definition">general power</defterm>, for <intref check="valid" refid="ch.10" target.guid="_09fa7a87-ea51-4658-95bd-97bd9fce9027">chapter 10</intref>, see <intref check="valid" refid="sec.211" target.guid="_84b703a4-9f2d-4e8d-8943-e424fd026b21">section 211</intref><intref check="valid" refid="sec.211-ssec.1" target.guid="_c238211c-6d13-4e6b-98de-46ade3baf21d">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_4fc1f4b2-e80e-4cdb-8236-186a4d8d9c8f" id="sch-def.goods_"><txt break.before="1"><defterm guid="_27b467b8-13f6-439d-a80d-1111ccbb5889" id="sch-def.goods" type="definition">goods</defterm> means goods that are intended to be used, or are of a kind likely to be used, for personal, domestic or household use or consumption.</txt></definition><definition affected.by.uncommenced="0" guid="_74b6f8eb-b9ea-42d1-b41b-1dc99ac8c111" id="sch-def.GVM_"><txt break.before="1"><defterm guid="_9b9f9599-0979-4703-b752-488459d20e2b" id="sch-def.GVM" type="definition">GVM</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-1995-009" target.version.series="9b6b47f6-005d-47e6-afd5-1c5039eda4c6" type="act"><name emphasis="yes">Transport Operations (Road Use Management) Act 1995</name></legref>, <legref check="valid" jurisd="QLD" refid="sch.4" target.doc.id="act-1995-009" target.guid="_489f18dc-7844-4d64-a315-1ac020087805" target.version.series="9b6b47f6-005d-47e6-afd5-1c5039eda4c6" type="act">schedule 4</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_ee1b597f-be12-424b-afc5-bafdb28fa61e" id="sch-def.hazardouscontaminant_"><txt break.before="1"><defterm guid="_f87ff835-4676-40db-8c5a-42a977bdbf78" id="sch-def.hazardouscontaminant-oc.3" type="definition">hazardous contaminant</defterm> see the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Environmental Protection Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sch.4" target.doc.id="act-1994-062" target.guid="_4ac3dc5c-9343-4b1e-ab22-39ea516411fe" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act">schedule 4</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_60a69b93-eb3c-4496-b855-645943396b26" id="sch-def.helprequirement_"><txt break.before="1"><defterm guid="_97577d80-c5e9-4a1a-9056-c67009250411" id="sch-def.helprequirement" type="definition">help requirement</defterm>, for <intref check="valid" refid="ch.10" target.guid="_09fa7a87-ea51-4658-95bd-97bd9fce9027">chapter 10</intref>, see <intref check="valid" refid="sec.212" target.guid="_f22ebbec-1c50-44f2-a8cf-beb906b42077">section 212</intref><intref check="valid" refid="sec.212-ssec.1" target.guid="_4865b90a-a853-4d52-98d0-c9f0b7cfabe1">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_6133439e-aa54-400f-a9ce-0d410c1eef21" id="sch-def.identitycard_"><txt break.before="1"><defterm guid="_dd081555-4824-4d94-9f0c-d098c726f2a3" id="sch-def.identitycard" type="definition">identity card</defterm>, for <intref check="valid" refid="ch.10" target.guid="_09fa7a87-ea51-4658-95bd-97bd9fce9027">chapter 10</intref>, see <intref check="valid" refid="sec.181" target.guid="_05db7fe2-0cb0-42f6-a6e2-f72f622036f8">section 181</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_2eb03a79-8754-44d4-8410-fda39a188bb5" id="sch-def.illegaldumpingofwasteprovision_"><txt break.before="1"><defterm guid="_10df324d-91e9-4aeb-9f22-99408626ab7d" id="sch-def.illegaldumpingofwasteprovision" type="definition">illegal dumping of waste provision</defterm> means <intref check="valid" refid="sec.104" target.guid="_428f4a48-281f-4088-8124-b981fb6fd86a">section 104</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_ba4af211-b056-4485-a77c-b64eeeda76f2" id="sch-def.impact_"><txt break.before="1"><defterm guid="_892ca82e-2ded-4e55-8fff-835dd749b24a" id="sch-def.impact" type="definition">impact</defterm>, in relation to a product, means the product’s impact, from the perspective of waste and resource management, throughout the life cycle of the product.</txt></definition><definition affected.by.uncommenced="0" guid="_4a1df90f-4907-4291-9ba2-fed7a19b533e" id="sch-def.informationnotice_"><txt break.before="1"><defterm guid="_81f26673-6571-435d-824f-79f295a0c68f" id="sch-def.informationnotice" type="definition">information notice</defterm>, for a decision, means a notice stating—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1233541e-a64e-4350-8dd2-12bd907906a4" id="sch-def.informationnotice-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the decision; and</txt></block></li><li guid="_fb056d3c-a183-4314-bc2d-4cd06bca8e0b" id="sch-def.informationnotice-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the reasons for the decision; and</txt></block></li><li guid="_4ca0855b-b86b-4e54-8c2d-0fef0bce2a94" id="sch-def.informationnotice-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the review details.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_07d25d13-b7b2-4c21-a9a5-da290b02ed53" id="sch-def.informationrequirement_"><txt break.before="1"><defterm guid="_624d706b-b7e2-4116-add0-148210bc5700" id="sch-def.informationrequirement" type="definition">information requirement</defterm>, for <intref check="valid" refid="ch.10" target.guid="_09fa7a87-ea51-4658-95bd-97bd9fce9027">chapter 10</intref>, see <intref check="valid" refid="sec.237" target.guid="_d177b638-c589-47aa-a23b-7a92dec8bcb1">section 237</intref><intref check="valid" refid="sec.237-ssec.3" target.guid="_d52f04f9-9b56-42bd-8f51-19ecf539a12a">(3)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_bd7137d4-8dfe-4beb-961b-8301d82063c0" id="sch-def.infringementnotice_"><txt break.before="1"><defterm guid="_787398a2-338c-4cf1-997b-ce465eda6748" id="sch-def.infringementnotice" type="definition">infringement notice</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-1999-070" target.version.series="98b1c6c5-4112-4f50-bf2f-c03eb0a343e4" type="act"><name emphasis="yes">State Penalties Enforcement Act 1999</name></legref>, <legref check="valid" jurisd="QLD" refid="sch.2" target.doc.id="act-1999-070" target.guid="_fb75e380-1b08-4e32-91c8-063856ac9951" target.version.series="98b1c6c5-4112-4f50-bf2f-c03eb0a343e4" type="act">schedule 2</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_204e20d1-b601-4fda-9452-a9b66d7cd824" id="sch-def.internalreviewapplication_"><txt break.before="1"><defterm guid="_1d328fe8-81de-42e8-8c92-c274f512a909" id="sch-def.internalreviewapplication" type="definition">internal review application</defterm>, for <intref check="valid" refid="ch.9" target.guid="_f87113fc-b8b5-4d77-bf6d-0ff636dc4f53">chapter 9</intref>, see <intref check="valid" refid="sec.175" target.guid="_dd491b1a-b12c-4d07-a495-62fb7ff394f3">section 175</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_47544ded-e23c-4bd5-9a57-16f44bb79545" id="sch-def.internalreviewdecision_"><txt break.before="1"><defterm guid="_17b2c9c9-4fe1-42c1-9d06-fe23e888ad5d" id="sch-def.internalreviewdecision" type="definition">internal review decision</defterm>, for <intref check="valid" refid="ch.9" target.guid="_f87113fc-b8b5-4d77-bf6d-0ff636dc4f53">chapter 9</intref>, see <intref check="valid" refid="sec.178" target.guid="_f11dca8a-acba-4193-892c-b49665cb9c83">section 178</intref><intref check="valid" refid="sec.178-ssec.1" target.guid="_4f834f6d-3343-4068-8820-91c409bb688a">(1)</intref><intref check="valid" refid="sec.178-ssec.1-para1.b" target.guid="_c56e34d0-7f58-40b1-888a-21efabe0f5c3">(b)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_8e61262b-ca99-4733-a22c-88ba273ff818" id="sch-def.land_"><txt break.before="1"><defterm guid="_a5e6b091-4137-43e7-8bf9-5d1d84576785" id="sch-def.land" type="definition">land</defterm> includes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1ec3ee8b-2609-4df8-9ccb-8a4903635473" id="sch-def.land-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the airspace above land; and</txt></block></li><li guid="_64c78120-967b-4b5b-bb00-a0589033aebf" id="sch-def.land-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">land that is, or is at any time, covered by waters; and</txt></block></li><li guid="_eb58613c-7853-4f5f-bb20-009b1115ced1" id="sch-def.land-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">waters.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_99c0780a-8223-4bcc-aab6-4b6cb1e81325" id="sch-def.lawfullymanagedandtransported_"><txt break.before="1"><defterm guid="_d5053abb-36e3-4d4c-85fc-bc5627c55330" id="sch-def.lawfullymanagedandtransported" type="definition">lawfully managed and transported</defterm>, for asbestos or waste containing asbestos, for <intref check="valid" refid="ch.3" target.guid="_9d174c0e-d3d4-4fcd-b62c-7b3babd007b7">chapter 3</intref>, see <intref check="valid" refid="sec.26" target.guid="_5010083a-a6a1-4327-8946-4fe72cdbaedc">section 26</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_771b483e-b382-4004-b557-bc81c11622ff" id="sch-def.levyablewaste_"><txt break.before="1"><defterm guid="_e5bf5143-01e2-4171-b435-f06e4a5f363d" id="sch-def.levyablewaste" type="definition">levyable waste</defterm>, for <intref check="valid" refid="ch.3" target.guid="_9d174c0e-d3d4-4fcd-b62c-7b3babd007b7">chapter 3</intref>, see <intref check="valid" refid="sec.26" target.guid="_5010083a-a6a1-4327-8946-4fe72cdbaedc">section 26</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_abc83e84-3cf9-41dc-97c4-7269164f7183" id="sch-def.levyablewastedisposalsite_"><txt break.before="1"><defterm guid="_26f2e5fe-2f40-4bc8-8bf8-1017e48d6a40" id="sch-def.levyablewastedisposalsite" type="definition">levyable waste disposal site</defterm> see <intref check="valid" refid="sec.26" target.guid="_5010083a-a6a1-4327-8946-4fe72cdbaedc">section 26</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_b6a8530c-3231-4019-b7c2-97f0729e4e56" id="sch-def.levyperiod_"><txt break.before="1"><defterm guid="_c9b668e7-8d9a-4f96-8b5a-547bbf0a724c" id="sch-def.levyperiod" type="definition">levy period</defterm>, for <intref check="valid" refid="ch.3" target.guid="_9d174c0e-d3d4-4fcd-b62c-7b3babd007b7">chapter 3</intref>, see <intref check="valid" refid="sec.26" target.guid="_5010083a-a6a1-4327-8946-4fe72cdbaedc">section 26</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_78d36fc1-15d4-43e5-b930-7f573b3165a4" id="sch-def.manufacturer_"><txt break.before="1"><defterm guid="_57bb06c5-a9bc-45c5-b94b-9dee6184e027" id="sch-def.manufacturer" type="definition">manufacturer</defterm>, of a beverage product, see <intref check="valid" refid="sec.99O" target.guid="_f354b7b3-f257-436f-a999-d9ae08a15928">section 99O</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_ba4a278e-c6cf-469b-81c7-29b03fdba999" id="sch-def.materialenvironmentalharm_"><txt break.before="1"><defterm guid="_9630f7b2-abeb-4bfe-84ab-7a57b8af155d" id="sch-def.materialenvironmentalharm" type="definition">material environmental harm</defterm>, for <intref check="valid" refid="ch.8" target.guid="_598380ab-31bf-4319-8271-2fc98c9c0cef">chapter 8</intref>, see <intref check="valid" refid="sec.156" target.guid="_475775cb-1225-4273-a6a1-084d20d8d817">section 156</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_e3a5e3e7-f527-4d92-ab4d-e1e17fe7b872" id="sch-def.materialrecoveryagreement_"><txt break.before="1"><defterm guid="_d6c18aa1-d738-49c7-b636-dff0582636da" id="sch-def.materialrecoveryagreement" type="definition">material recovery agreement</defterm> see <intref check="valid" refid="sec.99ZF" target.guid="_33938bd0-a5b5-4e5f-aa4b-4d2caff4e5c1">section 99ZF</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_feb44970-3ef8-40a3-8e51-3762d77b0e13" id="sch-def.materialrecoveryfacility_"><txt break.before="1"><defterm guid="_c3b3b2a7-77fc-4c7d-8936-a5ace4babd13" id="sch-def.materialrecoveryfacility" type="definition">material recovery facility</defterm>, for <intref check="valid" refid="ch.4" target.guid="_d097040d-7d09-4509-a319-3458078dbcf6">chapter 4</intref>, <intref check="valid" refid="ch.4-pt.3B" target.guid="_966a4f59-9a4a-4284-944b-1b3cc55c7b8c">part 3B</intref>, see <intref check="valid" refid="sec.99ZE" target.guid="_33139e39-0e65-48f1-8900-6123d1482f17">section 99ZE</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_c32828b7-9c01-4584-85b7-3e8fa8fb77d3" id="sch-def.monitoringsystem_"><txt break.before="1"><defterm guid="_36a47b2c-33b2-4576-bb5d-8bff74f7f8ae" id="sch-def.monitoringsystem" type="definition">monitoring system</defterm>, for <intref check="valid" refid="ch.3" target.guid="_9d174c0e-d3d4-4fcd-b62c-7b3babd007b7">chapter 3</intref>, see <intref check="valid" refid="sec.62" target.guid="_4807d1f8-c777-445d-bd82-69bf16ee0fd4">section 62</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_3602dd59-dd70-489d-9b21-520a36fc7d11" id="sch-def.motorvehicle_"><txt break.before="1"><defterm guid="_797c8c75-9392-4b9d-8c83-c00b39ffa58b" id="sch-def.motorvehicle" type="definition">motor vehicle</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-1995-009" target.version.series="9b6b47f6-005d-47e6-afd5-1c5039eda4c6" type="act"><name emphasis="yes">Transport Operations (Road Use Management) Act 1995</name></legref>, <legref check="valid" jurisd="QLD" refid="sch.4" target.doc.id="act-1995-009" target.guid="_489f18dc-7844-4d64-a315-1ac020087805" target.version.series="9b6b47f6-005d-47e6-afd5-1c5039eda4c6" type="act">schedule 4</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_9cef0377-d325-4e21-a922-91e8cd704358" id="sch-def.newspaper_"><txt break.before="1"><defterm guid="_c194a47f-4648-4409-b3ea-1a7b4a13c925" id="sch-def.newspaper" type="definition">newspaper</defterm> means a paper or pamphlet that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_afdf0c57-09d0-45a0-80cf-72254ae366f9" id="sch-def.newspaper-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">contains—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_79dc92f0-fae0-47e7-9a14-a21d977359d6" id="sch-def.newspaper-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">public news, information or occurrences; or</txt></block></li><li guid="_f26acdfe-310a-4231-b135-a41574838e04" id="sch-def.newspaper-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">remarks or observations on public news, information or occurrences; and</txt></block></li></list></block></li><li guid="_0a84e108-5fb0-44ef-97ad-38da3850349a" id="sch-def.newspaper-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is printed for sale or distribution; and</txt></block></li><li guid="_2e67ef61-1b8d-4d35-98d4-865e765b87a5" id="sch-def.newspaper-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">is published periodically or in parts or numbers at intervals of not more than 31 days between the publication of any 2 of the papers, pamphlets, parts or numbers;</txt></block></li></list><txt break.before="1">but does not include a paper or pamphlet that contains only material that is totally commercial in nature.</txt></definition><definition affected.by.uncommenced="0" guid="_8fd0d290-5675-46b8-9e53-5ff2fea1f3e7" id="sch-def.nonfriableasbestoscontainingmaterial_"><txt break.before="1"><defterm guid="_219666b8-208d-4477-aa19-aadaeb431421" id="sch-def.nonfriableasbestoscontainingmaterial" type="definition">non-friable asbestos-containing material</defterm>, for <intref check="valid" refid="ch.3" target.guid="_9d174c0e-d3d4-4fcd-b62c-7b3babd007b7">chapter 3</intref>, see <intref check="valid" refid="sec.26" target.guid="_5010083a-a6a1-4327-8946-4fe72cdbaedc">section 26</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_09484259-de1d-417b-aafe-6a383c003687" id="sch-def.nonlevyzone_"><txt break.before="1"><defterm guid="_8debec5c-96ca-4c2e-bbc1-4516e59fef0d" id="sch-def.nonlevyzone" type="definition">non-levy zone</defterm> see <intref check="valid" refid="sec.26" target.guid="_5010083a-a6a1-4327-8946-4fe72cdbaedc">section 26</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_4e29e507-2f1e-4621-a7bc-cf7da589c9c2" id="sch-def.notice_"><txt break.before="1"><defterm guid="_688a91e4-b815-445b-8ad4-3cce0ec8a3d7" id="sch-def.notice" type="definition">notice</defterm> means a written notice.</txt></definition><definition affected.by.uncommenced="0" guid="_33c260cf-3d91-4607-b0a8-c0f732deebbb" id="sch-def.occupier_"><txt break.before="1"><defterm guid="_a1490753-e36d-4c9e-8cc5-8fbf8c546d31" id="sch-def.occupier" type="definition">occupier</defterm>, of a place, includes a person who exercises or may exercise lawful authority or control in relation to the place, and includes a person apparently in charge of the place.</txt></definition><definition affected.by.uncommenced="0" guid="_0d7c5576-e69f-487b-ad91-dab80f4943ad" id="sch-def.offencewarning_"><txt break.before="1"><defterm guid="_b0eed253-07e3-4ac2-9c42-2094d5db494a" id="sch-def.offencewarning" type="definition">offence warning</defterm>, for <intref check="valid" refid="ch.10" target.guid="_09fa7a87-ea51-4658-95bd-97bd9fce9027">chapter 10</intref>, see <intref check="valid" refid="sec.181" target.guid="_05db7fe2-0cb0-42f6-a6e2-f72f622036f8">section 181</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_0306e13d-f6f4-4028-abc5-ab50819c3aee" id="sch-def.operator_"><txt break.before="1"><defterm guid="_a31fe291-2fd6-4644-ae2c-34e445ff7878" id="sch-def.operator" type="definition">operator</defterm>, of a container refund point that is a reverse vending machine, for <intref check="valid" refid="ch.4" target.guid="_d097040d-7d09-4509-a319-3458078dbcf6">chapter 4</intref>, <intref check="valid" refid="ch.4-pt.3B" target.guid="_966a4f59-9a4a-4284-944b-1b3cc55c7b8c">part 3B</intref>, see <intref check="valid" refid="sec.99K" target.guid="_23445d2e-ee94-474c-8107-0fd8e715f37e">section 99K</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_8e5112b0-1ea3-4e33-977c-de907c27b846" id="sch-def.operator_-oc.2"><txt break.before="1"><defterm guid="_1fb2a2d4-d29e-429a-b04f-6be45b97cf8b" id="sch-def.operator-def.operator" type="definition">operator</defterm>, of a waste facility, means the person who controls, and effectively has responsibility for, the operation of the waste facility, including, for example, according to the circumstances, any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_58f53662-892c-411f-a8f4-7225ca7e8aa4" id="sch-def.operator-oc.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the State;</txt></block></li><li guid="_b9cd69f4-58ee-4153-9c38-5401e5b416a4" id="sch-def.operator-oc.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a local government;</txt></block></li><li guid="_38f1f6f9-8246-43b1-8373-5725e863890e" id="sch-def.operator-oc.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a public authority;</txt></block></li><li guid="_e44e77d9-ad2b-48d8-80aa-5f1ec4002fa5" id="sch-def.operator-oc.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a corporation;</txt></block></li><li guid="_330939c0-5d57-4337-bc83-0f378f0ec69a" id="sch-def.operator-oc.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">an individual.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_5e475fb7-2e41-4875-b9ff-749ee6cdd021" id="sch-def.Organisation_"><txt break.before="1"><defterm guid="_e1a1d336-9d4b-4286-ad64-1df29255bd59" id="sch-def.Organisation" type="definition">Organisation</defterm> means the company appointed under <intref check="valid" refid="ch.4" target.guid="_d097040d-7d09-4509-a319-3458078dbcf6">chapter 4</intref>, <intref check="valid" refid="ch.4-pt.5" target.guid="_f76bac62-fb51-496d-9f22-9cbcfa27127c">part 5</intref> as the Product Responsibility Organisation for the container refund scheme.</txt></definition><definition affected.by.uncommenced="0" guid="_d5d4e341-3bc3-430b-a4ba-78fce83ea16a" id="sch-def.originaldecision_"><txt break.before="1"><defterm guid="_862c4b93-5f0b-45cd-9fed-b3c49c09640f" id="sch-def.originaldecision" type="definition">original decision</defterm>, for <intref check="valid" refid="ch.9" target.guid="_f87113fc-b8b5-4d77-bf6d-0ff636dc4f53">chapter 9</intref>, see <intref check="valid" refid="sec.178" target.guid="_f11dca8a-acba-4193-892c-b49665cb9c83">section 178</intref><intref check="valid" refid="sec.178-ssec.1" target.guid="_4f834f6d-3343-4068-8820-91c409bb688a">(1)</intref><intref check="valid" refid="sec.178-ssec.1-para1.a" target.guid="_7f57b24d-dda4-404c-9ebc-bf10cdb4f931">(a)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_6f64be9d-8027-43e1-b778-0d5ab9461be6" id="sch-def.owner_"><txt break.before="1"><defterm guid="_1a63cf31-5382-42e6-9e41-017ab5b4929f" id="sch-def.owner" type="definition">owner</defterm>, for <intref check="valid" refid="ch.10" target.guid="_09fa7a87-ea51-4658-95bd-97bd9fce9027">chapter 10</intref>, see <intref check="valid" refid="sec.181" target.guid="_05db7fe2-0cb0-42f6-a6e2-f72f622036f8">section 181</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_7f2e45c4-c44e-4456-9731-787919d38fc0" id="sch-def.packagingNEPM_"><txt break.before="1"><defterm guid="_21b922c7-167c-49dd-b7ab-beb901840577" id="sch-def.packagingNEPM" type="definition">packaging NEPM</defterm> means the National Environment Protection (Used Packaging Materials) Measure, made by the National Environment Protection Council under the <legref check="invalid" jurisd="CTH" type="act"><name emphasis="yes">National Environment Protection Council Act 1994</name> (Cwlth)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_f2671a96-f0e1-499d-a924-92da2def39b2" id="sch-def.participant_"><txt break.before="1"><defterm guid="_af63d2c8-8dd2-4a52-bdd7-5b4ecbfc96b1" id="sch-def.participant" type="definition">participant</defterm>, in a product stewardship scheme, means a person who has agreed to participate in the scheme.</txt></definition><definition affected.by.uncommenced="0" guid="_217ab73c-f6e3-4947-bc1a-f5d8f33c4568" id="sch-def.passengerdeclaration_"><txt break.before="1"><defterm guid="_43f9f478-4b61-42b3-8d7b-6bf8e468943c" id="sch-def.passengerdeclaration" type="definition">passenger declaration</defterm>, for a vehicle littering or illegal dumping offence, means a statutory declaration, made by a prescribed person for the offence, stating—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a0002e24-67b7-4c8b-80b5-6188ce77be53" id="sch-def.passengerdeclaration-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that the person was not the person who deposited the waste; and</txt></block></li><li guid="_61baef3a-64cd-4440-9426-36822fe866df" id="sch-def.passengerdeclaration-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the name and address of the person who deposited the waste.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_89fb14f8-5189-43a2-8c19-c41e17788831" id="sch-def.personaldetailsrequirement_"><txt break.before="1"><defterm guid="_63c07ca5-46c6-439d-8bae-fb116e286e29" id="sch-def.personaldetailsrequirement" type="definition">personal details requirement</defterm>, for <intref check="valid" refid="ch.10" target.guid="_09fa7a87-ea51-4658-95bd-97bd9fce9027">chapter 10</intref>, see <intref check="valid" refid="sec.232" target.guid="_66fc4434-714f-4621-abf6-e2851b9852c4">section 232</intref><intref check="valid" refid="sec.232-ssec.5" target.guid="_0dee309b-b712-42df-9429-d0d08420b311">(5)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_04e676d1-25f0-4c27-8a94-d8d18e238044" id="sch-def.personincontrol_"><txt break.before="1"><defterm guid="_4ba4f711-061f-4c49-b3bf-289adb7a49ad" id="sch-def.personincontrol" type="definition">person in control</defterm>, for <intref check="valid" refid="ch.10" target.guid="_09fa7a87-ea51-4658-95bd-97bd9fce9027">chapter 10</intref>, see <intref check="valid" refid="sec.181" target.guid="_05db7fe2-0cb0-42f6-a6e2-f72f622036f8">section 181</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_d8803b7b-ed91-4664-a817-1178dea9cac0" id="sch-def.place_"><txt break.before="1"><defterm guid="_e2d8d04d-d1ef-4a5c-8f68-f3ac817bb4a0" id="sch-def.place" type="definition">place</defterm> includes premises and a place, including a public place, on land.</txt><note guid="_4165f6b3-80f9-4b42-bed2-7606b9adeb74" id="sch-def.place-note" type="example"><heading guid="_53cf72af-d5d1-463d-9a88-93212e52f2f7" id="sch-def.place-note-he">Note—</heading><block><txt break.before="1">This Act adopts a definition of <defterm guid="_8d4fe775-e4fe-46e4-abd2-33c6c5e3632a" type="mention">land</defterm> that includes waters.</txt></block></note></definition><definition affected.by.uncommenced="0" guid="_d2df87a9-0a62-4c60-afc8-2612c0dd408e" id="sch-def.planningentity_"><txt break.before="1"><defterm guid="_14bd8725-4c59-4065-9598-21d07226e9e1" id="sch-def.planningentity" type="definition">planning entity</defterm> see <intref check="valid" refid="sec.139" target.guid="_a27a1e50-04b9-4146-9b07-2b7aae097245">section 139</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_d1887891-2ed1-446c-bfb8-f737628c2dfb" id="sch-def.plasticitem_"><txt break.before="1"><defterm guid="_718cb0a9-2166-45e5-a6cc-edf459c5c324" id="sch-def.plasticitem" type="definition">plastic item</defterm>, for chapter 4, part 3AA, see section 99GB.</txt></definition><definition affected.by.uncommenced="0" guid="_bb16604d-3264-4593-bf1c-96411a0dfdda" id="sch-def.polluterpaysprinciple_"><txt break.before="1"><defterm guid="_aea0a98e-6973-485f-9513-e8a64da6f2a1" id="sch-def.polluterpaysprinciple" type="definition">polluter pays principle</defterm> see <intref check="valid" refid="sec.10" target.guid="_995cab1e-4dfd-4c6b-b75c-8bd9359d722a">section 10</intref><intref check="valid" refid="sec.10-ssec.1" target.guid="_36d39155-9924-403d-b8ba-67106143d971">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_e3eb411b-041f-46b4-97eb-b21fed611661" id="sch-def.premises_"><txt break.before="1"><defterm guid="_1ff6b35c-1ca4-4f92-9844-ded07aafd1ae" id="sch-def.premises" type="definition">premises</defterm> includes a building and the land on which the building is situated, and also includes any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dc276d84-c9b9-42bc-be94-759719cf3c00" id="sch-def.premises-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">vacant land;</txt></block></li><li guid="_c8c98ca9-d4ff-430a-9f08-0e048e852f8d" id="sch-def.premises-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a vacant house;</txt></block></li><li guid="_0c657079-39d7-44aa-bd37-58e88f585e3f" id="sch-def.premises-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a building that is for sale or rent and that is clearly signed as being for sale or rent;</txt></block></li><li guid="_3d55b5c7-3f9e-4c8a-ad3d-6b3beaea147f" id="sch-def.premises-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a dwelling house or other building under construction.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_2e1fa564-d596-410d-b3d9-e5285fd7e626" id="sch-def.prescribedperson_"><txt break.before="1"><defterm guid="_915fc76a-3173-4170-a653-e901b45db7d0" id="sch-def.prescribedperson" type="definition">prescribed person</defterm>, for a vehicle littering or illegal dumping offence, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1065fd53-9fdf-4e7e-9686-a5464bbb6ce3" id="sch-def.prescribedperson-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the person in whose name the vehicle associated with the commission of the offence is registered under a registration Act; or</txt></block></li><li guid="_7ab6c1d0-dabf-461a-94ab-809a560d2f72" id="sch-def.prescribedperson-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a person named in a known user declaration or a sold vehicle declaration under the <legref check="valid" jurisd="QLD" target.doc.id="act-1999-070" target.version.series="98b1c6c5-4112-4f50-bf2f-c03eb0a343e4" type="act"><name emphasis="yes">State Penalties Enforcement Act 1999</name></legref> in relation to the offence.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_07951827-5d0e-4f8e-a17b-82d44fd823eb" id="sch-def.prescribedprovision_"><txt break.before="1"><defterm guid="_223cc606-284f-4049-b6e4-c1d6acfcbcbb" id="sch-def.prescribedprovision" type="definition">prescribed provision</defterm>, for <intref check="valid" refid="ch.11" target.guid="_e6645484-8c0c-4512-9bf9-7a0ca2fe74f1">chapter 11</intref>, see <intref check="valid" refid="sec.245" target.guid="_6aa8e51c-3b29-4452-b45a-4568902296cc">section 245</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_2f44eaec-e774-4a23-a073-9315f4f21023" id="sch-def.priorityproduct_"><txt break.before="1"><defterm guid="_c7d418ac-2e91-4fdc-9e03-60043b7c9700" id="sch-def.priorityproduct" type="definition">priority product</defterm> means a product stated to be a priority product under the priority statement as currently in force.</txt></definition><definition affected.by.uncommenced="0" guid="_def1788f-f1dc-443d-af3f-7e52c324c8db" id="sch-def.prioritystatement_"><txt break.before="1"><defterm guid="_d3093f6e-b8a4-4fa2-8b13-b04e31d93b89" id="sch-def.prioritystatement" type="definition">priority statement</defterm> means the document approved and gazetted as the priority statement under <intref check="valid" refid="ch.4" target.guid="_d097040d-7d09-4509-a319-3458078dbcf6">chapter 4</intref>, <intref check="valid" refid="ch.4-pt.2" target.guid="_aebf4c27-c11e-444c-ac6f-8df8171f1835">part 2</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_c3927e79-ba3c-4126-9f7c-8652c9fd0eb7" id="sch-def.prioritywaste_"><txt break.before="1"><defterm guid="_79608346-44b5-4981-ad6a-e7f8cadb8bde" id="sch-def.prioritywaste" type="definition">priority waste</defterm> means a category of waste stated to be a priority waste under the priority statement as currently in force.</txt></definition><definition affected.by.uncommenced="0" guid="_51cae28e-cec7-4a37-ac44-de7016c0d2c3" id="sch-def.produce_"><txt break.before="1"><defterm guid="_6eeeca3e-9fa3-4d90-b0cd-ccd187007987" id="sch-def.produce" type="definition">produce</defterm> includes manufacture or otherwise provide.</txt></definition><definition affected.by.uncommenced="0" guid="_b178da48-0ccf-46eb-ab7e-204a4a7ed505" id="sch-def.producer_"><txt break.before="1"><defterm guid="_3bd303bf-f306-410f-80ca-5aa9e6f7196d" id="sch-def.producer" type="definition">producer</defterm>, for <intref check="valid" refid="ch.4" target.guid="_d097040d-7d09-4509-a319-3458078dbcf6">chapter 4</intref>, see <intref check="valid" refid="sec.74A" target.guid="_bcaa9b29-55ad-4836-a0c0-e5e2c0d254cf">section 74A</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_0773ab4b-0a99-4f3e-bd66-5d412237a41b" id="sch-def.product_"><txt break.before="1"><defterm guid="_f26dd089-efa1-40a0-bf02-161fd6d33f70" id="sch-def.product" type="definition">product</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_152cee85-f834-4cf8-842e-7a4fc214dae4" id="sch-def.product-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">means a product that has reached the end of its useful life; and</txt></block></li><li guid="_3105dbae-feb4-44f7-b4d5-33525a725586" id="sch-def.product-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">includes a product that has not been used and any packaging for the product.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_79675e35-f24c-409d-81a8-6c66bc1a6d96" id="sch-def.productstewardshipprinciple_"><txt break.before="1"><defterm guid="_859cf3ad-3ff8-4151-9ca5-5ec5a60a43a7" id="sch-def.productstewardshipprinciple" type="definition">product stewardship principle</defterm> see <intref check="valid" refid="sec.13" target.guid="_eb53b3f9-50e7-4b78-b5e9-fcd311a8955a">section 13</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_d175c833-6475-421e-b257-49138a382dd3" id="sch-def.productstewardshipscheme_"><txt break.before="1"><defterm guid="_adbd22fd-cd17-4de0-af8a-6feda4bfb2a1" id="sch-def.productstewardshipscheme" type="definition">product stewardship scheme</defterm> see <intref check="valid" refid="sec.83" target.guid="_1caf4eea-d1c8-4946-854b-834ff84c274c">section 83</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_7ed33ead-8ec8-429d-9b27-a330662ce3c4" id="sch-def.progressivecapping_"><txt break.before="1"><defterm guid="_644361f2-5d1a-4f44-ac7f-d3d70d3004de" id="sch-def.progressivecapping" type="definition">progressive capping</defterm>, for <intref check="valid" refid="ch.3" target.guid="_9d174c0e-d3d4-4fcd-b62c-7b3babd007b7">chapter 3</intref>, see <intref check="valid" refid="sec.26" target.guid="_5010083a-a6a1-4327-8946-4fe72cdbaedc">section 26</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_9181f51b-1d58-49ed-95d1-aebde58b423d" id="sch-def.proposedaction_"><txt break.before="1"><defterm guid="_ffca69fd-dcab-4045-ab02-dd5c8419365c" id="sch-def.proposedaction" type="definition">proposed action</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bface7e5-d3f1-484e-825a-f4799d21c8ac" id="sch-def.proposedaction-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for <intref check="valid" refid="ch.4" target.guid="_d097040d-7d09-4509-a319-3458078dbcf6">chapter 4</intref>, <intref check="valid" refid="ch.4-pt.5" target.guid="_f76bac62-fb51-496d-9f22-9cbcfa27127c">part 5</intref>, <intref check="valid" refid="ch.4-pt.5-div.4" target.guid="_336fdfa9-101d-446e-8286-d78271a183d0">division 4</intref>—see <intref check="valid" refid="sec.102X" target.guid="_4195f74e-aebf-4f04-868e-96f7b4a6eccc">section 102X</intref><intref check="valid" refid="sec.102X-ssec.1" target.guid="_dffbe720-b06e-47cf-a722-67141b18dea7">(1)</intref>; or</txt></block></li><li guid="_e92fac05-85ca-4fb4-910d-0e4fc20035da" id="sch-def.proposedaction-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for <intref check="valid" refid="ch.8A" target.guid="_7c2636c7-59ac-4241-be5c-684e0ad0e559">chapter 8A</intref>—see <intref check="valid" refid="sec.173ZB" target.guid="_e5c5f579-dad9-46e8-9371-bae7a3151605">section 173ZB</intref><intref check="valid" refid="sec.173ZB-ssec.1" target.guid="_6055ba1e-788a-4a03-95fd-9fc3a58c0ca8">(1)</intref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_a04a39fd-f33a-4a43-bd42-ee9ea594f70f" id="sch-def.proximityprinciple_"><txt break.before="1"><defterm guid="_cb9304ae-3fb3-4b85-a760-91d1fcc82eea" id="sch-def.proximityprinciple" type="definition">proximity principle</defterm> see <intref check="valid" refid="sec.12" target.guid="_e34868c5-7a4b-49c6-9f41-00c1c84ea7bc">section 12</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_7147e92f-ff64-4b60-bad8-6131ea8b92d5" id="sch-def.publicplace_"><txt break.before="1"><defterm guid="_7abc3880-ff34-4097-bfce-a1d1534b0332" id="sch-def.publicplace" type="definition">public place</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5553baee-5fe4-4613-86cd-96d596c91321" id="sch-def.publicplace-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a place, or part of the place—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_962b196e-8ac0-429d-9abb-4b504a21f69a" id="sch-def.publicplace-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the public is entitled to use, is open to members of the public or is used by the public, whether or not on payment of money; or</txt><note guid="_f2e83429-5e62-45a3-b84f-80dcd628fa61" id="sch-def.publicplace-para1.a-para2.i-note" type="example"><heading guid="_c6754312-163d-4ea1-9f7e-c0fe055b9430" id="sch-def.publicplace-para1.a-para2.i-note-he">Examples of a place that may be a public place under <intref check="valid" refid="sch-def.publicplace-para1.a-para2.i" target.guid="_962b196e-8ac0-429d-9abb-4b504a21f69a">subparagraph (i)</intref>—</heading><block><txt break.before="1">a beach, a park, a road</txt></block></note></block></li><li guid="_67a31dc0-181c-4c5f-9bc3-d769ab59ef3b" id="sch-def.publicplace-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the occupier of which allows, whether or not on payment of money, members of the public to enter; or</txt><note guid="_66656970-35bd-44af-8542-22cf7c03d921" id="sch-def.publicplace-para1.a-para2.ii-note" type="example"><heading guid="_38a732d2-b5e6-4e6d-b459-acb45c71d318" id="sch-def.publicplace-para1.a-para2.ii-note-he">Examples of a place that may be a public place under <intref check="valid" refid="sch-def.publicplace-para1.a-para2.ii" target.guid="_67a31dc0-181c-4c5f-9bc3-d769ab59ef3b">subparagraph (ii)</intref>—</heading><block><txt break.before="1">a saleyard, a showground</txt></block></note></block></li></list></block></li><li guid="_5ba399a9-1cd4-461f-8769-4e5bb17d9801" id="sch-def.publicplace-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a place that is a public place under another Act.</txt></block></li></list></definition><definition affected.by.uncommenced="0" change="ins" guid="_167b7ed7-1c40-4ea1-ba9c-b787db81053b" id="sch-def.ratenotice_"><txt break.before="1"><defterm guid="_10153e63-aacf-4636-81fd-0205babceb3b" id="sch-def.ratenotice" type="definition">rate notice</defterm>, for chapter 3, part 7, see section 73D.</txt></definition><definition affected.by.uncommenced="0" guid="_45b88f7a-f2ba-4f52-94a4-158edcb92236" id="sch-def.reasonablybelieves_"><txt break.before="1"><defterm guid="_06f8d41b-35ed-4d3f-aece-391117ae5c21" id="sch-def.reasonablybelieves" type="definition">reasonably believes</defterm> means believes on grounds that are reasonable in the circumstances.</txt></definition><definition affected.by.uncommenced="0" guid="_41079bc6-b838-4673-b3e7-899e3cfd8579" id="sch-def.reasonablysuspects_"><txt break.before="1"><defterm guid="_a382e64b-9d74-44bb-9b7e-6275280145f9" id="sch-def.reasonablysuspects" type="definition">reasonably suspects</defterm> means suspects on grounds that are reasonable in the circumstances.</txt></definition><definition affected.by.uncommenced="0" guid="_42908b10-afab-48da-8e8b-7db24078d104" id="sch-def.recipient_"><txt break.before="1"><defterm guid="_e126acdf-7886-4729-a3cf-1c1fd208a80d" id="sch-def.recipient" type="definition">recipient</defterm>, for <intref check="valid" refid="ch.12" target.guid="_f4cc8e77-df20-4f6f-ab16-3f7eadde1ca1">chapter 12</intref>, see <intref check="valid" refid="sec.253" target.guid="_6797fa0e-a2c4-4bb5-b2f2-ff8946650ac4">section 253</intref><intref check="valid" refid="sec.253-ssec.1" target.guid="_44634a53-d2b4-4075-be64-2860c10874b6">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_5ea2a9b7-8017-467f-997c-e646b510be9e" id="sch-def.recoveryamount_"><txt break.before="1"><defterm guid="_651eec59-af2d-4829-b1e2-7e529dae8b0a" id="sch-def.recoveryamount" type="definition">recovery amount</defterm>, for a quantity of containers, for <intref check="valid" refid="ch.4" target.guid="_d097040d-7d09-4509-a319-3458078dbcf6">chapter 4</intref>, <intref check="valid" refid="ch.4-pt.3B" target.guid="_966a4f59-9a4a-4284-944b-1b3cc55c7b8c">part 3B</intref>, see <intref check="valid" refid="sec.99ZG" target.guid="_6287134c-07d0-4e2e-855d-b93c296747d0">section 99ZG</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_039ef3b7-445c-4a69-b9e2-5cfcf1d865b4" id="sch-def.recoveryamountprotocol_"><txt break.before="1"><defterm guid="_000dbf9f-0a12-49f7-b28b-8be059bd66d5" id="sch-def.recoveryamountprotocol" type="definition">recovery amount protocol</defterm>, for <intref check="valid" refid="ch.4" target.guid="_d097040d-7d09-4509-a319-3458078dbcf6">chapter 4</intref>, <intref check="valid" refid="ch.4-pt.3B" target.guid="_966a4f59-9a4a-4284-944b-1b3cc55c7b8c">part 3B</intref>, see <intref check="valid" refid="sec.99ZK" target.guid="_9e3b884e-c80f-42a1-910b-6dac15a9c528">section 99ZK</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_534e104e-b414-4616-93ff-5ea28e8525aa" id="sch-def.recyclingactivity_"><txt break.before="1"><defterm guid="_3a9b5def-f507-4678-b319-d5962e1b2dc9" id="sch-def.recyclingactivity" type="definition">recycling activity</defterm> includes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ca95cea1-5dc9-4200-b8c4-563873c572a9" id="sch-def.recyclingactivity-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">re-using waste resources; and</txt></block></li><li guid="_58a3be9c-0b8e-4204-bdd8-bbac867e8b7a" id="sch-def.recyclingactivity-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">recycling waste resources to make the same or different products; and</txt></block></li><li guid="_5a2bc2a4-106e-4064-b0d1-6560e42afc58" id="sch-def.recyclingactivity-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">recovering waste resources, including extracting energy from those resources.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_8657374c-f9af-46bd-9a87-7d7b1304fc70" id="sch-def.recyclingefficiencythreshold_"><txt break.before="1"><defterm guid="_5ff3d33b-9c67-44ee-a795-8b3c09283da9" id="sch-def.recyclingefficiencythreshold" type="definition">recycling efficiency threshold</defterm> means the percentage of feedstock used for a recycling activity that is not disposed of as landfill as a result of the activity.</txt></definition><definition affected.by.uncommenced="0" guid="_65f6e739-e48f-4eef-b8da-fd6d38ea4bb4" id="sch-def.refundamount_"><txt break.before="1"><defterm guid="_4e86e6c7-afa4-4780-af9b-dd8c49f3f2eb" id="sch-def.refundamount" type="definition">refund amount</defterm>, for <intref check="valid" refid="ch.4" target.guid="_d097040d-7d09-4509-a319-3458078dbcf6">chapter 4</intref>, <intref check="valid" refid="ch.4-pt.3B" target.guid="_966a4f59-9a4a-4284-944b-1b3cc55c7b8c">part 3B</intref>, see <intref check="valid" refid="sec.99K" target.guid="_23445d2e-ee94-474c-8107-0fd8e715f37e">section 99K</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_17d591ee-40de-43e0-8dfa-7033cbf56344" id="sch-def.refunddeclaration_"><txt break.before="1"><defterm guid="_d107c78e-e141-4fed-95dc-d4fcac5a8da5" id="sch-def.refunddeclaration" type="definition">refund declaration</defterm>, for <intref check="valid" refid="ch.4" target.guid="_d097040d-7d09-4509-a319-3458078dbcf6">chapter 4</intref>, <intref check="valid" refid="ch.4-pt.3B" target.guid="_966a4f59-9a4a-4284-944b-1b3cc55c7b8c">part 3B</intref>, see <intref check="valid" refid="sec.99T" target.guid="_a8737675-d7cf-452e-bffe-7022e13b0eb8">section 99T</intref><intref check="valid" refid="sec.99T-ssec.2" target.guid="_4e42d772-8753-486c-bd04-2903bb037bef">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_c9cbd8de-b3ad-4bcd-a2dd-c84070b3365f" id="sch-def.refundmarking_"><txt break.before="1"><defterm guid="_80ee6645-9e18-44ff-b1c3-6b8bf25a5a5c" id="sch-def.refundmarking" type="definition">refund marking</defterm>, for <intref check="valid" refid="ch.4" target.guid="_d097040d-7d09-4509-a319-3458078dbcf6">chapter 4</intref>, <intref check="valid" refid="ch.4-pt.3B" target.guid="_966a4f59-9a4a-4284-944b-1b3cc55c7b8c">part 3B</intref>, see <intref check="valid" refid="sec.99K" target.guid="_23445d2e-ee94-474c-8107-0fd8e715f37e">section 99K</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_f0a74c45-5033-4769-a31f-fef77c2094f5" id="sch-def.registered_"><txt break.before="1"><defterm guid="_cbfcd143-4f53-489a-960c-afd8bd3015ee" id="sch-def.registered" type="definition">registered</defterm>, for a container, for <intref check="valid" refid="ch.4" target.guid="_d097040d-7d09-4509-a319-3458078dbcf6">chapter 4</intref>, <intref check="valid" refid="ch.4-pt.3B" target.guid="_966a4f59-9a4a-4284-944b-1b3cc55c7b8c">part 3B</intref>, see <intref check="valid" refid="sec.99K" target.guid="_23445d2e-ee94-474c-8107-0fd8e715f37e">section 99K</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_4bf3bbb0-fbda-4097-bbf2-f1dbce418b66" id="sch-def.registeredoperator_"><txt break.before="1"><defterm guid="_39f7b4f4-2e9d-46a0-8f3c-cac9bb47325e" id="sch-def.registeredoperator" type="definition">registered operator</defterm>, of a vehicle that is a motor vehicle, means the registered operator of the vehicle under the <legref check="valid" jurisd="QLD" target.doc.id="act-1995-009" target.version.series="9b6b47f6-005d-47e6-afd5-1c5039eda4c6" type="act"><name emphasis="yes">Transport Operations (Road Use Management) Act 1995</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_27318f78-dac0-473b-94fa-2658aa74ae34" id="sch-def.registeredresourceproducer_"><txt break.before="1"><defterm guid="_d57137d1-7977-4294-b2b4-ac6af7ae9459" id="sch-def.registeredresourceproducer" type="definition">registered resource producer</defterm>, for an end of waste code, for <intref check="valid" refid="ch.8" target.guid="_598380ab-31bf-4319-8271-2fc98c9c0cef">chapter 8</intref>, see <intref check="valid" refid="sec.156" target.guid="_475775cb-1225-4273-a6a1-084d20d8d817">section 156</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_9cf09582-6fee-45eb-be95-ff9d1dcbc5fa" id="sch-def.registrationAct_"><txt break.before="1"><defterm guid="_774fd74a-ba71-45b5-9aab-ba8e22b74cce" id="sch-def.registrationAct" type="definition">registration Act</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-1999-070" target.version.series="98b1c6c5-4112-4f50-bf2f-c03eb0a343e4" type="act"><name emphasis="yes">State Penalties Enforcement Act 1999</name></legref>, <legref check="valid" jurisd="QLD" refid="sch.2" target.doc.id="act-1999-070" target.guid="_fb75e380-1b08-4e32-91c8-063856ac9951" target.version.series="98b1c6c5-4112-4f50-bf2f-c03eb0a343e4" type="act">schedule 2</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_3ab90cb7-3317-4f01-8af4-d0e20583e4b2" id="sch-def.regulatedproductstewardshipscheme_"><txt break.before="1"><defterm guid="_3e499c89-1a37-4cfe-ae5f-01a7f6701109" id="sch-def.regulatedproductstewardshipscheme" type="definition">regulated product stewardship scheme</defterm> see <intref check="valid" refid="sec.85" target.guid="_996980af-422f-4706-8c10-f826b26d4403">section 85</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_c81127f1-6edf-484a-a7e3-6480ece55eb6" id="sch-def.regulatedwaste_"><txt break.before="1"><defterm guid="_38242825-d731-436a-8082-44726af6afe4" id="sch-def.regulatedwaste" type="definition">regulated waste</defterm> means waste that is prescribed under a regulation as regulated waste.</txt></definition><definition affected.by.uncommenced="0" change="ins" guid="_92000337-2dc4-49fc-b72d-dc1bd1b8a9c0" id="sch-def.relevantpayment_"><txt break.before="1"><defterm guid="_7f8498da-9b96-42f8-ba68-c7694c450479" id="sch-def.relevantpayment" type="definition">relevant payment</defterm>, for chapter 3, part 7, see section 73D.</txt></definition><definition affected.by.uncommenced="0" guid="_f3744c2a-f5c1-432f-ae5b-ae7e0cc9900f" id="sch-def.relevantwaste_"><txt break.before="1"><defterm guid="_84e243cb-17a4-4932-9d63-29ff9824b7e8" id="sch-def.relevantwaste" type="definition">relevant waste</defterm>, for a planning entity, see <intref check="valid" refid="sec.139" target.guid="_a27a1e50-04b9-4146-9b07-2b7aae097245">section 139</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_a0aa1369-31fd-4231-a109-e95319cf2f32" id="sch-def.repealedlitteringprovisions_"><txt break.before="1"><defterm guid="_0a455b43-4683-43d7-b0a5-df300d067f74" id="sch-def.repealedlitteringprovisions" type="definition">repealed littering provisions</defterm> means the following repealed provisions of the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Environmental Protection Act</name></legref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0c5163c8-85a6-4367-8a84-695fd0c1c408" id="sch-def.repealedlitteringprovisions-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0"><legref check="valid" jurisd="QLD" refid="ch.8" target.doc.id="act-1994-062" target.guid="_9c6df2d1-e595-478a-8427-65c8a2371a19" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act">chapter 8</legref>, <legref check="unknown" jurisd="QLD" type="act">part 3A</legref>;</txt></block></li><li guid="_4900b4b3-25e2-4b2e-b485-d05259529378" id="sch-def.repealedlitteringprovisions-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0"><legref check="valid" jurisd="QLD" refid="sec.474A" target.doc.id="act-1994-062" target.guid="_88d7c0b7-f231-4dfe-8134-1758a71e5847" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act">section 474A</legref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_06159c9d-1b28-40bf-ba51-df39cfb3cc5f" id="sch-def.repealedprovision_"><txt break.before="1"><defterm guid="_805bb5b3-6f4f-425c-a2a9-a89f3c839eb8" id="sch-def.repealedprovision" type="definition">repealed provision</defterm>, for <intref check="valid" refid="ch.15" target.guid="_e29e6029-0de7-4179-b4b5-dc009e83ff1d">chapter 15</intref>, <intref check="valid" refid="ch.15-pt.1" target.guid="_cb874e86-2711-4689-b761-86215eb8de6d">part 1</intref>, see <intref check="valid" refid="sec.272" target.guid="_38e8727a-e306-4872-81a5-355f4db74840">section 272</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_091e5ff7-6d4d-4d10-96b9-e9e97a8a9f88" id="sch-def.repealedwastemanagementpolicy_"><txt break.before="1"><defterm guid="_921739d2-e2c5-481b-9be9-52cc5f6037f2" id="sch-def.repealedwastemanagementpolicy" type="definition">repealed waste management policy</defterm> means the repealed <legref check="valid" jurisd="QLD" target.doc.id="sl-2000-0180" target.version.series="1d8dafe3-2f50-4b7e-b42d-938ec9328d50" type="subordleg"><name emphasis="yes">Environmental Protection (Waste Management) Policy 2000</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_3fbab171-cdc1-4422-b44f-79ee9b954d94" id="sch-def.reportingentity_"><txt break.before="1"><defterm guid="_57d8292c-ae54-494d-9e86-4bdb54ea34e1" id="sch-def.reportingentity" type="definition">reporting entity</defterm> see <intref check="valid" refid="sec.150" target.guid="_85142930-4988-43fd-ad83-7b4d2231691f">section 150</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_7fdf98a9-325b-48e2-8506-d485db658514" id="sch-def.residuewaste_"><txt break.before="1"><defterm guid="_2449abf2-0576-4d4e-bb91-3cef8ca8a51b" id="sch-def.residuewaste" type="definition">residue waste</defterm> see <intref check="valid" refid="sec.26" target.guid="_5010083a-a6a1-4327-8946-4fe72cdbaedc">section 26</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_0d23b116-908c-4734-b24e-8a432077e4c3" id="sch-def.residuewastediscountingapplication_"><txt break.before="1"><defterm guid="_327ac9d0-6c25-471a-be2d-04c6476382e6" id="sch-def.residuewastediscountingapplication" type="definition">residue waste discounting application</defterm>, for <intref check="valid" refid="ch.3" target.guid="_9d174c0e-d3d4-4fcd-b62c-7b3babd007b7">chapter 3</intref>, see <intref check="valid" refid="sec.44" target.guid="_3ebbfc62-487a-4486-bc2a-97aeedf20ab6">section 44</intref><intref check="valid" refid="sec.44-ssec.1" target.guid="_71f34269-5c4f-40e5-a419-9ea4010ddde9">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_d7c776ae-e75f-44ce-8b27-e54a6bac0749" id="sch-def.resource_"><txt break.before="1"><defterm guid="_3b588f22-9e43-4026-b1fe-aa61d219835e" id="sch-def.resource" type="definition">resource</defterm>, for <intref check="valid" refid="ch.8" target.guid="_598380ab-31bf-4319-8271-2fc98c9c0cef">chapter 8</intref>, see <intref check="valid" refid="sec.155" target.guid="_ea60f7e6-134f-45f3-9ec6-29c50cd28871">section 155</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_6f1d837a-8933-4b89-8f64-59dde04ed0e4" id="sch-def.resourcerecoveryarea_"><txt break.before="1"><defterm guid="_f3a6626b-8e21-4c8e-8446-10170dff4a8d" id="sch-def.resourcerecoveryarea" type="definition">resource recovery area</defterm> see <intref check="valid" refid="sec.72R" target.guid="_0acf4c39-5f4f-418c-b8a1-2abd8f6db492">section 72R</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_44938c16-c318-4e66-86ac-9a2cad4746fd" id="sch-def.resourceuser_"><txt break.before="1"><defterm guid="_6ea97951-e47b-4340-b001-471253d34fec" id="sch-def.resourceuser" type="definition">resource user</defterm>, for <intref check="valid" refid="ch.8" target.guid="_598380ab-31bf-4319-8271-2fc98c9c0cef">chapter 8</intref>, see <intref check="valid" refid="sec.155" target.guid="_ea60f7e6-134f-45f3-9ec6-29c50cd28871">section 155</intref><intref check="valid" refid="sec.155-ssec.3" target.guid="_0f1241a7-7aed-4b5b-b494-a9fadf2d3e03">(3)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_07340530-992a-420a-a4b5-84d3be33a8c2" id="sch-def.retailer_"><txt break.before="1"><defterm guid="_88ac9d12-85b9-4f6d-9168-35e5a3a716cb" id="sch-def.retailer" type="definition">retailer</defterm> see <intref check="valid" refid="sec.99C" target.guid="_07f9335b-61ac-4df1-a685-76f7f4e849f1">section 99C</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_d90c61d1-3d44-4fab-8ea3-62e2595d16b2" id="sch-def.reversevendingmachine_"><txt break.before="1"><defterm guid="_b1114e97-fe85-48b6-86c9-ba2cb674aba3" id="sch-def.reversevendingmachine" type="definition">reverse vending machine</defterm>, for <intref check="valid" refid="ch.4" target.guid="_d097040d-7d09-4509-a319-3458078dbcf6">chapter 4</intref>, <intref check="valid" refid="ch.4-pt.3B" target.guid="_966a4f59-9a4a-4284-944b-1b3cc55c7b8c">part 3B</intref>, see <intref check="valid" refid="sec.99K" target.guid="_23445d2e-ee94-474c-8107-0fd8e715f37e">section 99K</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_97157088-a7ac-4e06-ae6a-60435aa8855f" id="sch-def.reviewdetails_"><txt break.before="1"><defterm guid="_31dd8998-4a51-42e1-91ba-33e2933d7d4e" id="sch-def.reviewdetails" type="definition">review details</defterm>, for an information notice for a decision, means a statement in the information notice as follows—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ba9c09a9-e083-48d0-940a-a517d83a1d90" id="sch-def.reviewdetails-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that the person given the notice may apply for a review of the decision to which the notice relates under <intref check="valid" refid="ch.9" target.guid="_f87113fc-b8b5-4d77-bf6d-0ff636dc4f53">chapter 9</intref>, <intref check="valid" refid="ch.9-pt.1" target.guid="_ad404a1b-abd8-4a3f-b648-ca96982b0046">part 1</intref>;</txt></block></li><li guid="_d41546a6-ed1c-4a93-bc34-3476d28e16ac" id="sch-def.reviewdetails-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">about the period or time allowed for making the application for a review;</txt></block></li><li guid="_0bba1009-ef03-4e81-bc8c-0f1cfccd117f" id="sch-def.reviewdetails-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">about how to apply for a review.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_70531997-4d69-4f5b-bb9b-f378217321a3" id="sch-def.road_"><txt break.before="1"><defterm guid="_52dda233-45d5-4ed6-a7db-3319ce8cec9f" id="sch-def.road" type="definition">road</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f0367275-e588-4d2d-93c6-5263a667bdfd" id="sch-def.road-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an area of land dedicated to public use as a road; or</txt></block></li><li guid="_5a80841f-8fd0-4202-9b00-cfd8dbc10426" id="sch-def.road-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an area that is open to or used by the public and is developed for, or has as 1 of its main uses, the driving or riding of motor vehicles; or</txt></block></li><li guid="_8be78b41-9d3d-455e-b4ea-8ba07743c699" id="sch-def.road-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a bridge, culvert, ferry, ford, tunnel or viaduct; or</txt></block></li><li guid="_ef538c48-21a9-4bda-a492-8d80e46c9acd" id="sch-def.road-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a pedestrian or bicycle path; or</txt></block></li><li guid="_4fa5cc46-6bc7-4247-bb69-8246ed2d886e" id="sch-def.road-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">a part of an area, bridge, culvert, ferry, ford, tunnel, viaduct or path mentioned in any of <intref check="valid" refid="sch-def.road-para1.a" target.guid="_f0367275-e588-4d2d-93c6-5263a667bdfd">paragraphs (a)</intref> to <intref check="valid" refid="sch-def.road-para1.d" target.guid="_ef538c48-21a9-4bda-a492-8d80e46c9acd">(d)</intref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_3dc85655-c3ae-43c3-947e-84a6165654d1" id="sch-def.scheme_"><txt break.before="1"><defterm guid="_1926214e-9539-4d1b-a465-76910057a537" id="sch-def.scheme" type="definition">scheme</defterm> means the container refund scheme.</txt></definition><definition affected.by.uncommenced="0" guid="_d91ecbd1-c8c1-4869-a1c6-2d7611e1c116" id="sch-def.schemeinvitation_"><txt break.before="1"><defterm guid="_4cda7d70-d954-4780-ad3a-fd5430afa531" id="sch-def.schemeinvitation" type="definition">scheme invitation</defterm> see <intref check="valid" refid="sec.78" target.guid="_7f16495e-edc1-47da-b83c-2cbc154e2202">section 78</intref><intref check="valid" refid="sec.78-ssec.1" target.guid="_eb43f2b4-4593-41e9-8f44-832dad38645d">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_4608ac40-ec7f-4ce4-b17d-ed37a9303685" id="sch-def.schememanager_"><txt break.before="1"><defterm guid="_cf7f7069-a05b-42ca-b43c-2c756a78df7b" id="sch-def.schememanager" type="definition">scheme manager</defterm>, for a product stewardship scheme, means the entity identified in the scheme as the scheme manager for the scheme.</txt></definition><definition affected.by.uncommenced="0" guid="_75ff7ec9-0a05-4800-b4a5-34963641fc41" id="sch-def.section325smallsite_"><txt break.before="1"><defterm guid="_613c695e-8c4f-4ab1-bb74-fc45b26d8adf" id="sch-def.section325smallsite" type="definition">section 325 small site</defterm>, for <intref check="valid" refid="ch.3" target.guid="_9d174c0e-d3d4-4fcd-b62c-7b3babd007b7">chapter 3</intref>, see <intref check="valid" refid="sec.26" target.guid="_5010083a-a6a1-4327-8946-4fe72cdbaedc">section 26</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_f433386c-3e9a-4fa6-9a8e-f77003edd43b" id="sch-def.sectorofplanningentities_"><txt break.before="1"><defterm guid="_7e3c3cd6-56ca-49c0-9f6a-0a630573e32a" id="sch-def.sectorofplanningentities" type="definition">sector of planning entities</defterm> see <intref check="valid" refid="sec.139" target.guid="_a27a1e50-04b9-4146-9b07-2b7aae097245">section 139</intref><intref check="valid" refid="sec.139-ssec.2" target.guid="_2cb1a7f6-0c37-454b-a8f0-ed8ab4d05981">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_f4f29c5c-5386-48ef-bcb6-e99609a8e62e" id="sch-def.sectorofreportingentities_"><txt break.before="1"><defterm guid="_a22fb401-6ab3-4fe0-886f-c91b3fe708d7" id="sch-def.sectorofreportingentities" type="definition">sector of reporting entities</defterm> see <intref check="valid" refid="sec.150" target.guid="_85142930-4988-43fd-ad83-7b4d2231691f">section 150</intref><intref check="valid" refid="sec.150-ssec.2" target.guid="_9b46a550-ba4b-43d1-a899-c565a4f3d813">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_48d736ee-b30c-4bad-bd94-37f5c35ecf0e" id="sch-def.sectorwaste_"><txt break.before="1"><defterm guid="_6b92a53b-f5d9-4ab5-bd4d-ceffc85b8678" id="sch-def.sectorwaste" type="definition">sector waste</defterm>, for a sector of planning entities, see <intref check="valid" refid="sec.139" target.guid="_a27a1e50-04b9-4146-9b07-2b7aae097245">section 139</intref><intref check="valid" refid="sec.139-ssec.9" target.guid="_315b4f82-4ce3-48d9-b972-f007cfa8458f">(9)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_6514b4ae-f865-4a6b-bdbe-42a3458b2577" id="sch-def.securedeliveryprovision_"><txt break.before="1"><defterm guid="_1397b0da-7225-490c-bea5-25f7e7f3b334" id="sch-def.securedeliveryprovision" type="definition">secure delivery provision</defterm> means <intref check="valid" refid="sec.108" target.guid="_afdf6b20-9947-4872-b5f3-4a2e3f0b7d14">section 108</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_ee228f6f-6391-4f7c-b7fe-a85f6bfd0e76" id="sch-def.sell_"><txt break.before="1"><defterm guid="_8bbcf406-00cf-44c1-b4a7-3931cd44659f" id="sch-def.sell" type="definition">sell</defterm> includes supply free of charge for a commercial or promotional purpose.</txt></definition><definition affected.by.uncommenced="0" guid="_2960d9ec-9ad3-42e1-be3a-97b495f3141e" id="sch-def.seriousenvironmentalharm_"><txt break.before="1"><defterm guid="_71fb9b47-555b-43bd-b491-e1231fd0aaad" id="sch-def.seriousenvironmentalharm" type="definition">serious environmental harm</defterm>, for <intref check="valid" refid="ch.8" target.guid="_598380ab-31bf-4319-8271-2fc98c9c0cef">chapter 8</intref>, see <intref check="valid" refid="sec.156" target.guid="_475775cb-1225-4273-a6a1-084d20d8d817">section 156</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_c534cbf2-9355-4562-a732-5180f1c85cea" id="sch-def.seriouslocalevent_"><txt break.before="1"><defterm guid="_57f3dc1c-3231-4c78-ac49-1b3931481cab" id="sch-def.seriouslocalevent" type="definition">serious local event</defterm>, for <intref check="valid" refid="ch.3" target.guid="_9d174c0e-d3d4-4fcd-b62c-7b3babd007b7">chapter 3</intref>, see <intref check="valid" refid="sec.26" target.guid="_5010083a-a6a1-4327-8946-4fe72cdbaedc">section 26</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_a4658880-cd6b-4a83-a9e1-04b7362990a6" id="sch-def.seriouslocaleventwaste_"><txt break.before="1"><defterm guid="_23524e1e-dd9a-4f03-8dd4-403f5040ccfb" id="sch-def.seriouslocaleventwaste" type="definition">serious local event waste</defterm>, for <intref check="valid" refid="ch.3" target.guid="_9d174c0e-d3d4-4fcd-b62c-7b3babd007b7">chapter 3</intref>, see <intref check="valid" refid="sec.26" target.guid="_5010083a-a6a1-4327-8946-4fe72cdbaedc">section 26</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_e2465fad-2d70-42fa-a94d-e91fa65022a0" id="sch-def.showcausenotice_"><txt break.before="1"><defterm guid="_862d8418-d9c7-44f6-b517-5d44f69f205f" id="sch-def.showcausenotice" type="definition">show cause notice</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_12854beb-2d3f-4919-b957-57c98c297ce0" id="sch-def.showcausenotice-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for <intref check="valid" refid="ch.4" target.guid="_d097040d-7d09-4509-a319-3458078dbcf6">chapter 4</intref>, <intref check="valid" refid="ch.4-pt.5" target.guid="_f76bac62-fb51-496d-9f22-9cbcfa27127c">part 5</intref>, <intref check="valid" refid="ch.4-pt.5-div.4" target.guid="_336fdfa9-101d-446e-8286-d78271a183d0">division 4</intref>—see <intref check="valid" refid="sec.102X" target.guid="_4195f74e-aebf-4f04-868e-96f7b4a6eccc">section 102X</intref><intref check="valid" refid="sec.102X-ssec.3" target.guid="_bd1b5c3f-3684-4260-8ebb-55657220764f">(3)</intref>; or</txt></block></li><li guid="_903ab2bf-6994-4966-9310-c9d5a6ce8579" id="sch-def.showcausenotice-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for <intref check="valid" refid="ch.8A" target.guid="_7c2636c7-59ac-4241-be5c-684e0ad0e559">chapter 8A</intref>—see <intref check="valid" refid="sec.173ZB" target.guid="_e5c5f579-dad9-46e8-9371-bae7a3151605">section 173ZB</intref><intref check="valid" refid="sec.173ZB-ssec.2" target.guid="_0ff1a816-497f-41ee-93cf-aaa5fbaa7ace">(2)</intref>; or</txt></block></li><li guid="_da53ae3f-38dd-4f8d-add0-ed6d1013c8a6" id="sch-def.showcausenotice-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">for <intref check="valid" refid="ch.11" target.guid="_e6645484-8c0c-4512-9bf9-7a0ca2fe74f1">chapter 11</intref>—see <intref check="valid" refid="sec.246" target.guid="_a4635f5c-fd6a-4bc9-bc30-84398aee1eef">section 246</intref><intref check="valid" refid="sec.246-ssec.2" target.guid="_fc72d696-3b76-4fc2-93cd-a9f48387468e">(2)</intref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_c118c91d-c387-4f89-8bd4-678b25b6e6cc" id="sch-def.showcauseperiod_"><txt break.before="1"><defterm guid="_69c4975d-c48d-4832-8156-cca6305d1491" id="sch-def.showcauseperiod" type="definition">show cause period</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_69b9461c-c9a2-43fe-b5cd-fd83782fa38c" id="sch-def.showcauseperiod-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for <intref check="valid" refid="ch.4" target.guid="_d097040d-7d09-4509-a319-3458078dbcf6">chapter 4</intref>, <intref check="valid" refid="ch.4-pt.5" target.guid="_f76bac62-fb51-496d-9f22-9cbcfa27127c">part 5</intref>, <intref check="valid" refid="ch.4-pt.5-div.4" target.guid="_336fdfa9-101d-446e-8286-d78271a183d0">division 4</intref>—see <intref check="valid" refid="sec.102X" target.guid="_4195f74e-aebf-4f04-868e-96f7b4a6eccc">section 102X</intref><intref check="valid" refid="sec.102X-ssec.4" target.guid="_47b06467-feba-4ba5-8563-132ab3181651">(4)</intref><intref check="valid" refid="sec.102X-ssec.4-para1.f" target.guid="_3ac1d9f9-ba1f-4c9a-ac92-7b58b3f9287b">(f)</intref>; or</txt></block></li><li guid="_85d3d2fa-be64-4576-a336-777f445dc7f0" id="sch-def.showcauseperiod-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for <intref check="valid" refid="ch.8A" target.guid="_7c2636c7-59ac-4241-be5c-684e0ad0e559">chapter 8A</intref>—see <intref check="valid" refid="sec.173ZB" target.guid="_e5c5f579-dad9-46e8-9371-bae7a3151605">section 173ZB</intref><intref check="valid" refid="sec.173ZB-ssec.3" target.guid="_a47c73fa-3e15-4825-a259-0db23bc701c7">(3)</intref><intref check="valid" refid="sec.173ZB-ssec.3-para1.f" target.guid="_405285a0-4ba2-4d77-89e2-5af0f654539c">(f)</intref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_45ff7c48-d348-4474-85c9-4b47c601f3e3" id="sch-def.singleuseplasticitem_"><txt break.before="1"><defterm guid="_185f91fb-9294-42c9-a740-f1af9fa18ec2" id="sch-def.singleuseplasticitem" type="definition">single-use plastic item</defterm>, for chapter 4, part 3AA, see section 99GB.</txt></definition><definition affected.by.uncommenced="0" guid="_670be5c9-f489-4007-a09f-51a04f7c913f" id="sch-def.smallsite_"><txt break.before="1"><defterm guid="_fba7ed09-5c38-4d66-a45f-f67f2dda4e67" id="sch-def.smallsite" type="definition">small site</defterm> see <intref check="valid" refid="sec.26" target.guid="_5010083a-a6a1-4327-8946-4fe72cdbaedc">section 26</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_bc43f557-eff6-43d7-bf00-393dddc814cc" id="sch-def.spentconviction_"><txt break.before="1"><defterm guid="_1c9d1415-86a9-4bed-b90b-747c8e36dda3" id="sch-def.spentconviction" type="definition">spent conviction</defterm> means a conviction—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ee12ddb8-d9e4-40d8-b5ac-9c878ae9f438" id="sch-def.spentconviction-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for which the rehabilitation period under the <legref check="valid" jurisd="QLD" target.doc.id="act-1986-020" target.version.series="591f88fd-8a19-4573-8e3f-8c58be43de4d" type="act"><name emphasis="yes">Criminal Law (Rehabilitation of Offenders) Act 1986</name></legref> has expired under that Act; and</txt></block></li><li guid="_a8d6e491-bbb5-4ae2-8cd0-0e1ccaa70619" id="sch-def.spentconviction-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that is not revived under <legref check="valid" jurisd="QLD" refid="sec.11" target.doc.id="act-1986-020" target.guid="_e680078b-a298-4d9b-9c8b-97a096bdae64" target.version.series="591f88fd-8a19-4573-8e3f-8c58be43de4d" type="act">section 11</legref> of that Act.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_dd3f1d87-9586-4b45-a73f-58007143b19d" id="sch-def.stateentity_"><txt break.before="1"><defterm guid="_8e6aed42-18fe-4ef8-a328-d0c52bd3f3fb" id="sch-def.stateentity" type="definition">state entity</defterm> see <intref check="valid" refid="sec.132" target.guid="_47792c0f-8d54-463b-8577-64c4fafdf3a6">section 132</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_f1b1470d-3881-4eeb-882a-ddf15a75c337" id="sch-def.technicaladvisorypanel_"><txt break.before="1"><defterm guid="_e09b1e5a-4074-4735-bce8-b9e6d77353d2" id="sch-def.technicaladvisorypanel" type="definition">technical advisory panel</defterm>, for <intref check="valid" refid="ch.8" target.guid="_598380ab-31bf-4319-8271-2fc98c9c0cef">chapter 8</intref>, <intref check="valid" refid="ch.8-pt.2" target.guid="_920ec791-c4bc-4602-bbd8-ecc394288b37">part 2</intref>, see <intref check="valid" refid="sec.173G" target.guid="_8e27f1ef-73d8-4f59-85fb-6008167b9d2f">section 173G</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_cc29f4b9-5a5e-4366-93c8-103fbb4dc510" id="sch-def.type_"><txt break.before="1"><defterm guid="_b55d1757-cb0c-4332-94dc-47719dc3a1bc" id="sch-def.type" type="definition">type</defterm>, of a container, for <intref check="valid" refid="ch.4" target.guid="_d097040d-7d09-4509-a319-3458078dbcf6">chapter 4</intref>, <intref check="valid" refid="ch.4-pt.3B" target.guid="_966a4f59-9a4a-4284-944b-1b3cc55c7b8c">part 3B</intref>, see <intref check="valid" refid="sec.99N" target.guid="_2759e633-4c4c-430d-8495-752aaa1d4d05">section 99N</intref><intref check="valid" refid="sec.99N-ssec.2" target.guid="_8c758696-fb3b-4a13-aaf3-dc081e0aa4bd">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_8ec82ea8-6ed2-4fa2-95f6-46cbe6fdb28d" id="sch-def.unlawfuldeliveryprovision_"><txt break.before="1"><defterm guid="_5d80522f-1dd6-4c59-9f8a-5d7b944ff191" id="sch-def.unlawfuldeliveryprovision" type="definition">unlawful delivery provision</defterm> means <intref check="valid" refid="sec.107" target.guid="_73a3990f-ec42-4086-8690-6fcd166c1cb1">section 107</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_94bc07b4-a9f5-4c73-bf58-2547c4fb1f1f" id="sch-def.unsolicitedadvertisingmaterial_"><txt break.before="1"><defterm guid="_73a0bceb-2a6a-4123-99a7-2a7e4e22128c" id="sch-def.unsolicitedadvertisingmaterial" type="definition">unsolicited advertising material</defterm>, for premises, see <intref check="valid" refid="sec.106" target.guid="_db9110bc-ddb2-4afd-9b94-2008aaa5e9d1">section 106</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_44387ec0-0c56-4afe-8713-257310a48013" id="sch-def.untreatedtimber_"><txt break.before="1"><defterm guid="_6ca510a5-013d-4503-85bd-0a48daab0058" id="sch-def.untreatedtimber" type="definition">untreated timber</defterm> means timber that has not been painted or treated with chemical preservatives to protect it against damage from insects, fungus, rot or the weather or other infestations or damage.</txt></definition><definition affected.by.uncommenced="0" guid="_a3e0fbc8-2f2f-46d2-9660-148864ba9e16" id="sch-def.userpaysprinciple_"><txt break.before="1"><defterm guid="_5ea8b804-daa8-4e64-8c40-6005b6ffcb2c" id="sch-def.userpaysprinciple" type="definition">user pays principle</defterm> see <intref check="valid" refid="sec.11" target.guid="_e87d5d21-dc63-4ab8-8f63-d271181b77c1">section 11</intref><intref check="valid" refid="sec.11-ssec.1" target.guid="_ce18a6d0-71b3-45d9-8463-02c84ae672d0">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_96086538-3e26-49eb-9fde-a86a221b1caa" id="sch-def.vehicle_"><txt break.before="1"><defterm guid="_57798fbe-d914-4889-bffd-7b66c2f82151" id="sch-def.vehicle" type="definition">vehicle</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f7dd1bb0-7325-48b8-bb9e-f90b11807dfa" id="sch-def.vehicle-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">means a vehicle under the <legref check="valid" jurisd="QLD" target.doc.id="act-1995-009" target.version.series="9b6b47f6-005d-47e6-afd5-1c5039eda4c6" type="act"><name emphasis="yes">Transport Operations (Road Use Management) Act 1995</name></legref>; and</txt></block></li><li guid="_f848f94f-c33e-4164-9ccf-64a12f3cb0f7" id="sch-def.vehicle-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">includes a vessel under that Act.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_c9baac08-d1f1-44a9-9efa-b14bb2e29287" id="sch-def.vehiclelitteringorillegaldumpingoffence_"><txt break.before="1"><defterm guid="_f3f7992f-ae45-4d8b-8704-306c9cc693ba" id="sch-def.vehiclelitteringorillegaldumpingoffence" type="definition">vehicle littering or illegal dumping offence</defterm> see <intref check="valid" refid="sec.113" target.guid="_00707985-7a98-4b42-8d4f-5f2168915625">section 113</intref><intref check="valid" refid="sec.113-ssec.2" target.guid="_c0feaaa7-043c-4308-8fd1-dd2c15118532">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_6b858cb9-d365-43fb-aa04-11bcc4a52efb" id="sch-def.vehiclelitteringorillegaldumpingreport_"><txt break.before="1"><defterm guid="_f00c416c-98e6-402b-aa48-0b6a2e404be0" id="sch-def.vehiclelitteringorillegaldumpingreport" type="definition">vehicle littering or illegal dumping report</defterm> see <intref check="valid" refid="sec.118" target.guid="_ab59211b-3700-49b6-865a-1cca9af59b67">section 118</intref><intref check="valid" refid="sec.118-ssec.1" target.guid="_4f506499-1a1c-4481-b76b-20629fc653ce">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_e7cabc23-9a09-4b57-8dbb-4b777b1626fa" id="sch-def.voluntaryproductstewardshipscheme_"><txt break.before="1"><defterm guid="_40a5cc01-055a-4ced-958d-380c5da6cde4" id="sch-def.voluntaryproductstewardshipscheme" type="definition">voluntary product stewardship scheme</defterm> see <intref check="valid" refid="sec.84" target.guid="_ec14709a-f2fa-49f2-8218-f21075952d34">section 84</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_31f44183-51d9-4ea2-bc37-f5d61c0e9f12" id="sch-def.waste_"><txt break.before="1"><defterm guid="_9813e7d0-6f5b-413a-ad98-99f856cc3245" id="sch-def.waste" type="definition">waste</defterm> see <del xml:space="preserve">the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act"><name emphasis="no">Environmental Protection Act</name></legref>, </del>section <del xml:space="preserve"><legref check="valid" jurisd="QLD" refid="sec.13" target.doc.id="act-1994-062" target.guid="_6b3fbff7-317c-49d9-bbeb-992a24b95b64" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act">13</legref></del><ins xml:space="preserve">8AA</ins>.</txt></definition><definition affected.by.uncommenced="0" guid="_85ecfbd6-b143-4163-b8c4-578e04c85b36" id="sch-def.wasteandresourcemanagementhierarchy_"><txt break.before="1"><defterm guid="_15b3254f-fb1b-4534-8683-9eb88ff2ebc2" id="sch-def.wasteandresourcemanagementhierarchy" type="definition">waste and resource management hierarchy</defterm> see <intref check="valid" refid="sec.9" target.guid="_978f3e38-8893-48e6-adb3-3b06f4c468de">section 9</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_b03e3ee7-a41a-4e50-b8dc-48a8f4a35315" id="sch-def.wasteandresourcemanagementprinciples_"><txt break.before="1"><defterm guid="_6beacdbb-2222-4bd0-8562-6c80acea0ec8" id="sch-def.wasteandresourcemanagementprinciples" type="definition">waste and resource management principles</defterm> see <intref check="valid" refid="sec.4" target.guid="_f4dd7f9b-f57c-463f-95a9-0b1403302a20">section 4</intref><intref check="valid" refid="sec.4-ssec.2" target.guid="_d9a72fc8-396b-4af3-ab9e-e7328b71c924">(2)</intref><intref check="valid" refid="sec.4-ssec.2-para1.b" target.guid="_4ac264f4-3fe5-418d-821b-f51d87fa3a69">(b)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_307a16f3-e456-47dd-a044-8bbef5bc254b" id="sch-def.wasteaudit_"><txt break.before="1"><defterm guid="_899a5155-8261-4c41-8d03-8fff19e2c259" id="sch-def.wasteaudit" type="definition">waste audit</defterm>, for <intref check="valid" refid="ch.12" target.guid="_f4cc8e77-df20-4f6f-ab16-3f7eadde1ca1">chapter 12</intref>, see <intref check="valid" refid="sec.253" target.guid="_6797fa0e-a2c4-4bb5-b2f2-ff8946650ac4">section 253</intref><intref check="valid" refid="sec.253-ssec.1" target.guid="_44634a53-d2b4-4075-be64-2860c10874b6">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_73d2ae88-de18-44c7-b437-9d15f820b498" id="sch-def.wastedatareturn_"><txt break.before="1"><defterm guid="_ad9af195-73c9-4252-a42a-fcd44e9f6f89" id="sch-def.wastedatareturn" type="definition">waste data return</defterm>, for <intref check="valid" refid="ch.3" target.guid="_9d174c0e-d3d4-4fcd-b62c-7b3babd007b7">chapter 3</intref>, see <intref check="valid" refid="sec.72" target.guid="_d30e771f-e48c-4292-86ed-c1b4fb7d03e1">section 72</intref><intref check="valid" refid="sec.72-ssec.1" target.guid="_ba53cadb-d2d7-444e-889c-bf6ae38c6fe8">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_339df429-0216-4ef8-8673-5fd56e82b51a" id="sch-def.wastedisposalsite_"><txt break.before="1"><defterm guid="_4bd74511-477c-4701-afdc-8ab8cb9153d8" id="sch-def.wastedisposalsite" type="definition">waste disposal site</defterm> see <intref check="valid" refid="sec.8A" target.guid="_0f5ba32f-22f7-4ecf-acc9-535f9b7054fe">section 8A</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_754530a5-9513-48f3-859e-019da4aaca6d" id="sch-def.wastefacility_"><txt break.before="1"><defterm guid="_fc543551-bd23-487e-8113-68caede82a16" id="sch-def.wastefacility" type="definition">waste facility</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9405eec9-c3a1-4ac4-8f1f-15adefa12e98" id="sch-def.wastefacility-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">A <defterm guid="_344559e0-69d3-41f3-811a-0a859404f742" type="mention">waste facility</defterm> is a facility for the recycling, reprocessing, treatment, storage, incineration, conversion to energy, sorting, consolidation or disposal (including by disposal to landfill) of waste.</txt></block></li><li guid="_9c053aa3-144b-4a76-ab26-941ad698c0c6" id="sch-def.wastefacility-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">However, a <defterm guid="_2a4d987b-d96c-4473-ba1b-93985bbd93e9" type="mention">waste facility</defterm> does not include any of the following facilities—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1be72410-2313-49a6-87d6-a7d30730e10f" id="sch-def.wastefacility-para1.2-para2.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a facility that is lawfully operated for the sole purpose of disposing of waste generated by an environmentally relevant activity carried out under the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Environmental Protection Act</name></legref> if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4f59a594-6d8a-410d-a22f-d3169536b85a" id="sch-def.wastefacility-para1.2-para2.a-para3.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the waste is or was generated only by, and its generation is or was ancillary to, the operation of the activity; and</txt></block></li><li guid="_74f7451c-8b6f-467c-850e-cd2c869e7950" id="sch-def.wastefacility-para1.2-para2.a-para3.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the activity is not a waste management ERA; and</txt></block></li><li guid="_57e5798b-40e3-4815-a4d5-5a3e70ef360b" id="sch-def.wastefacility-para1.2-para2.a-para3.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the facility is operated by or for the entity carrying out the activity; and</txt></block></li><li guid="_6014cea3-805f-4011-b2ab-bb7b105bad2a" id="sch-def.wastefacility-para1.2-para2.a-para3.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">the facility is authorised under the same environmental authority as the activity;</txt></block></li></list></block></li><li guid="_3188f713-7bd8-4fdd-8226-a6c1a7207658" id="sch-def.wastefacility-para1.2-para2.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a facility that is lawfully operated for the sole purpose of disposing of waste generated by 1 or more resource activities carried out under the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Environmental Protection Act</name></legref> if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_30426ddc-8e8a-4917-baa4-72e669c53640" id="sch-def.wastefacility-para1.2-para2.b-para3.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the waste is or was generated only by, and its generation is or was ancillary to, the operation of 1 or more of the resource activities; and</txt></block></li><li guid="_990f4148-debe-41e2-966f-b5992f04af5f" id="sch-def.wastefacility-para1.2-para2.b-para3.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the facility is operated by or for an entity carrying out 1 or more of the resource activities; and</txt></block></li><li guid="_343d2201-15f3-4695-89b4-2d2fcc96267c" id="sch-def.wastefacility-para1.2-para2.b-para3.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the facility is authorised under the same environmental authority as 1 of the resource activities;</txt></block></li></list></block></li><li guid="_0bebc977-2a0d-48e8-afbe-1e1966b8b9ec" id="sch-def.wastefacility-para1.2-para2.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a facility that is lawfully operated for the sole purpose of disposing of waste generated by the processing, handling, storage or transport of materials from a resource activity carried out under the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Environmental Protection Act</name></legref> if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2991d81d-d8d2-4be3-aa3d-99fa6f06a9ef" id="sch-def.wastefacility-para1.2-para2.c-para3.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the waste is or was generated only by, and its generation is or was ancillary to, the processing, handling, storage or transport of the materials from the resource activity; and</txt></block></li><li guid="_e48412bd-3880-4e06-bc46-3a2a47e3c9e3" id="sch-def.wastefacility-para1.2-para2.c-para3.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the facility is operated by or for the entity carrying out the resource activity; and</txt></block></li><li guid="_5d3fa833-fede-4c5f-91b1-1f488bb2c7a1" id="sch-def.wastefacility-para1.2-para2.c-para3.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the facility is authorised under the same environmental authority as the resource activity;</txt></block></li></list></block></li><li guid="_42a8efb8-250d-43f6-a173-0e1529c3aa6c" id="sch-def.wastefacility-para1.2-para2.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a facility that is lawfully operated for the sole purpose of disposing of waste generated to remediate contaminated land recorded in the environmental management register or contaminated land register if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d3edf6f9-04a9-47db-84ec-da87a19ae757" id="sch-def.wastefacility-para1.2-para2.d-para3.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the waste was generated by an activity (the <defterm guid="_681a4d5f-9842-4c50-97d8-e8cfb7d3eb05" id="sch-def.wastefacility-para1.2-para2.d-def.initialactivity" type="definition">initial activity</defterm>) lawfully carried out on the contaminated land before the initial activity became an environmentally relevant activity under the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Environmental Protection Act</name></legref> (the <defterm guid="_cd4a936a-568d-4e4f-931a-1965389ce9af" id="sch-def.wastefacility-para1.2-para2.d-def.relevantactivity" type="definition">relevant activity</defterm>); and</txt></block></li><li guid="_582b19c1-26a8-45fe-9d06-a062ed41d906" id="sch-def.wastefacility-para1.2-para2.d-para3.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">from the day the initial activity became the relevant activity, the waste is or was generated by the relevant activity carried out on the contaminated land; and</txt></block></li><li guid="_a04eb517-d191-4464-9c8a-8951b3ffbca2" id="sch-def.wastefacility-para1.2-para2.d-para3.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">all of the following apply—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_db0df0d8-b278-401d-86fc-b3bb676fee87" id="sch-def.wastefacility-para1.2-para2.d-para3.iii-para4.A" provision.type="other"><no>(A)</no><block><txt break.before="0">the waste is or was generated only by, and its generation is or was ancillary to, the operation of the initial activity or relevant activity;</txt></block></li><li guid="_c70cd7cd-eec4-415d-b3cd-428e2f3f7611" id="sch-def.wastefacility-para1.2-para2.d-para3.iii-para4.B" provision.type="other"><no>(B)</no><block><txt break.before="0">the relevant activity is not a resource activity under the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Environmental Protection Act</name></legref> or a waste management ERA;</txt></block></li><li guid="_5b8b10d7-e54e-4f37-af3a-a9024ee0c8d1" id="sch-def.wastefacility-para1.2-para2.d-para3.iii-para4.C" provision.type="other"><no>(C)</no><block><txt break.before="0">the facility is operated by or for the entity carrying out the relevant activity;</txt></block></li><li guid="_22108747-d55f-42f0-96e6-9f0fef3d852d" id="sch-def.wastefacility-para1.2-para2.d-para3.iii-para4.D" provision.type="other"><no>(D)</no><block><txt break.before="0">the facility is authorised under the same environmental authority as the relevant activity.</txt></block></li></list></block></li></list></block></li></list></block></li></list></definition><definition affected.by.uncommenced="0" guid="_998df6bb-65d0-4967-a320-da6117fecade" id="sch-def.wastelevy_"><txt break.before="1"><defterm guid="_b544f27d-3c69-400a-ba0c-af2022d588bb" id="sch-def.wastelevy" type="definition">waste levy</defterm> see <intref check="valid" refid="sec.36" target.guid="_626aee8b-abb7-485d-9bb6-2be57d974507">section 36</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_5127a1fd-4f14-44c4-883f-2b8933dabeec" id="sch-def.wastelevyamount_"><txt break.before="1"><defterm guid="_31944cc8-882c-4b75-ad0f-ff25095227c4" id="sch-def.wastelevyamount" type="definition">waste levy amount</defterm> see <intref check="valid" refid="sec.26" target.guid="_5010083a-a6a1-4327-8946-4fe72cdbaedc">section 26</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_4eed2f4f-c2fc-4543-8852-f4853d32958f" id="sch-def.wastelevyinstalmentagreement_"><txt break.before="1"><defterm guid="_03f29a19-aabd-43d0-a8b7-db64c28e11ca" id="sch-def.wastelevyinstalmentagreement" type="definition">waste levy instalment agreement</defterm>, for <intref check="valid" refid="ch.3" target.guid="_9d174c0e-d3d4-4fcd-b62c-7b3babd007b7">chapter 3</intref>, see <intref check="valid" refid="sec.72B" target.guid="_fb40b28a-c841-4b72-b812-831af70b5018">section 72B</intref><intref check="valid" refid="sec.72B-ssec.1" target.guid="_b6265356-63ea-4a67-a3ff-d4f7a052ddd1">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_84b88830-7cf8-40d9-af2f-cf55ccd16baa" id="sch-def.wastelevyzone_"><txt break.before="1"><defterm guid="_1fe1abfe-c0fb-41a4-9ae1-7b2e25cafa51" id="sch-def.wastelevyzone" type="definition">waste levy zone</defterm> see <intref check="valid" refid="sec.26" target.guid="_5010083a-a6a1-4327-8946-4fe72cdbaedc">section 26</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_82bceb1c-ffb1-4a6a-be6e-24135144f4b6" id="sch-def.wastemanagementERA_"><txt break.before="1"><defterm guid="_8a42b629-8b5c-491f-a438-3589539dfa23" id="sch-def.wastemanagementERA" type="definition">waste management ERA</defterm> means any of the following activities to the extent the activity is prescribed under the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Environmental Protection Act</name></legref> as an environmentally relevant activity—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cd26dae0-41ec-472e-8223-617c3653af4c" id="sch-def.wastemanagementERA-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">metal recovery;</txt></block></li><li guid="_aca14a93-f85f-401e-ae69-98718132df2a" id="sch-def.wastemanagementERA-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">mechanically crushing, milling, grinding, shredding or sorting waste;</txt></block></li><li guid="_30c1ca53-d665-4fc0-b599-b9bde2b2e161" id="sch-def.wastemanagementERA-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">mechanically reprocessing waste;</txt></block></li><li guid="_d4311352-2683-4ec5-b6c4-c173f3c2a7c1" id="sch-def.wastemanagementERA-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">battery recycling;</txt></block></li><li guid="_6bb2b421-7529-4ccc-96ae-663b85a3a464" id="sch-def.wastemanagementERA-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">composting organic material, anaerobically digesting organic material or manufacturing soil conditioner;</txt></block></li><li guid="_3f164eab-6ee5-4c4a-b776-001d74e57521" id="sch-def.wastemanagementERA-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">waste reprocessing or treatment;</txt></block></li><li guid="_c12c26f2-e5c0-4e44-9a30-bf71a3662698" id="sch-def.wastemanagementERA-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">waste storage;</txt></block></li><li guid="_b6ff26d4-e39e-4568-9429-c50e8f2df4e7" id="sch-def.wastemanagementERA-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">regulated waste transport;</txt></block></li><li guid="_19a90146-bcc1-44de-a70e-af67ae1d8901" id="sch-def.wastemanagementERA-para1.i" provision.type="other"><no>(i)</no><block><txt break.before="0">regulated waste treatment;</txt></block></li><li guid="_ffde373e-25e3-4e12-9fb4-5f3674903416" id="sch-def.wastemanagementERA-para1.j" provision.type="other"><no>(j)</no><block><txt break.before="0">tyre recycling;</txt></block></li><li guid="_8de6f7b4-bca5-41f0-b273-db5a4aae7100" id="sch-def.wastemanagementERA-para1.k" provision.type="other"><no>(k)</no><block><txt break.before="0">waste disposal;</txt></block></li><li guid="_9b0d7005-855d-4720-9855-6f6ae78ac3ad" id="sch-def.wastemanagementERA-para1.l" provision.type="other"><no>(l)</no><block><txt break.before="0">waste incineration, thermal waste reprocessing or thermal treatment;</txt></block></li><li guid="_e7cb8d10-b567-4643-a1c6-f3ef4bf923bb" id="sch-def.wastemanagementERA-para1.m" provision.type="other"><no>(m)</no><block><txt break.before="0">operating a waste transfer station or resource recovery facility;</txt></block></li><li guid="_4d47a0c8-82a9-483a-ba94-ed9d81a77194" id="sch-def.wastemanagementERA-para1.n" provision.type="other"><no>(n)</no><block><txt break.before="0">maintaining a decommissioned waste disposal facility.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_da9dff5b-8352-487f-9936-284f079123fd" id="sch-def.wastemanagementstrategy_"><txt break.before="1"><defterm guid="_1d199179-8d02-4b9f-a9fa-7765a5daf465" id="sch-def.wastemanagementstrategy" type="definition">waste management strategy</defterm>, for the State, means the State’s waste management strategy under this Act.</txt></definition><definition affected.by.uncommenced="0" guid="_30393b3f-2ed5-4c80-b954-b1711f9365d6" id="sch-def.wastereductionandrecyclingplan_"><txt break.before="1"><defterm guid="_011964cc-66c7-4221-b361-0dab0bdc5437" id="sch-def.wastereductionandrecyclingplan" type="definition">waste reduction and recycling plan</defterm> see <intref check="valid" refid="sec.120" target.guid="_3037e148-d90d-4bf4-90cf-635c926cf2d0">section 120</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_b7b9b8e1-fcfd-457b-827b-e56d3dba1c10" id="sch-def.wastereductionandrecyclingplanobligation_"><txt break.before="1"><defterm guid="_2c3604d3-be4b-4e77-8e13-b00094b53134" id="sch-def.wastereductionandrecyclingplanobligation" type="definition">waste reduction and recycling plan obligation</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a9fb35d1-412d-4403-bf9c-4d12854d27e1" id="sch-def.wastereductionandrecyclingplanobligation-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for a local government, means the local government’s obligation under <intref check="valid" refid="sec.123" target.guid="_773ad283-3636-4011-aff1-9e8d7e9911e5">section 123</intref>; and</txt></block></li><li guid="_571bed87-c69c-48a5-8dab-50945e044018" id="sch-def.wastereductionandrecyclingplanobligation-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for a planning entity, means the planning entity’s obligation under <intref check="valid" refid="sec.141" target.guid="_a759607e-d125-46b1-ada8-e06af4da1c41">section 141</intref>; and</txt></block></li><li guid="_40e98603-af0c-439b-a0cf-df63dae25ab0" id="sch-def.wastereductionandrecyclingplanobligation-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">for a State entity, means the State entity’s obligation under <intref check="valid" refid="sec.133" target.guid="_15f0367f-8266-4147-8ff5-f5de578ccc5c">section 133</intref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_6fc6d923-6809-47c1-aca4-d8e1c8dab1d7" id="sch-def.wastereport_"><txt break.before="1"><defterm guid="_3b6a974d-7d4d-45cf-a171-767b25972814" id="sch-def.wastereport" type="definition">waste report</defterm>, for <intref check="valid" refid="ch.12" target.guid="_f4cc8e77-df20-4f6f-ab16-3f7eadde1ca1">chapter 12</intref>, see <intref check="valid" refid="sec.253" target.guid="_6797fa0e-a2c4-4bb5-b2f2-ff8946650ac4">section 253</intref><intref check="valid" refid="sec.253-ssec.1" target.guid="_44634a53-d2b4-4075-be64-2860c10874b6">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_af5a2a45-fc66-4720-b875-9790bba796d4" id="sch-def.weightmeasurementcriteria_"><txt break.before="1"><defterm guid="_402e44eb-8f2b-4bfa-a9c9-4968575a829e" id="sch-def.weightmeasurementcriteria" type="definition">weight measurement criteria</defterm>, for <intref check="valid" refid="ch.3" target.guid="_9d174c0e-d3d4-4fcd-b62c-7b3babd007b7">chapter 3</intref>, see <intref check="valid" refid="sec.26" target.guid="_5010083a-a6a1-4327-8946-4fe72cdbaedc">section 26</intref>.</txt></definition></deflist></block></schedule></schedules></act>