<?xml version="1.0" encoding="utf-8"?>
<!DOCTYPE act PUBLIC "-//OQPC//DTD QuILLS Act//EN" "Act.dtd">
<!--************************************************************************************************************-->
<!--                                              DISCLAIMER                                                    -->
<!---->
<!--Queensland does not accept responsibility for the accuracy or completeness of material on this website      -->
<!--(or any other website referred to on this website) except as set out below. Users should exercise their     -->
<!--own skill and care in the use of the material.                                                              -->
<!---->
<!--No warranty is given that the material located on this site, or on any other site referred to on this site, -->
<!--is free from error or omission. Users should exercise their own skill and care with respect to the use of   -->
<!--the material. Accordingly, the State of Queensland and its servants and agents expressly disclaim liability -->
<!--for any act done or omission made in reliance on any such material and any consequences of any such act or  -->
<!--omission. This notice must not be erased.                                                                   -->
<!---->
<!--************************************************************************************************************-->
<act amending="none" assent.date="2009-02-23T00:00:00+10:00" first.valid.date="2019-05-24T00:00:00+10:00" id="act-2009-003" in.force="allinforce" no="3" print.type="speciallabel:act-2009-003" publication.date="2020-02-07" special.label="bill-2019-043" title="Greenhouse Gas Storage Act 2009" type="act" version.desc.id="b810615a-62ad-4977-b238-f450e953d357" version.series.id="04733898-22fc-46eb-9266-ad7b447b75ba" year.assent="2009"><coverdata guid="_810d602f-2c9a-492e-997a-4ba4ae17718d" id="cd"><statusrecord guid="_2b720d34-6884-4e72-b173-c2a2bd76dec3" id="cd-status"><heading change="ins" guid="_8cf94f68-100a-4fff-afb0-975820e732f5" id="cd-status-he">Indicative reprint note</heading><block><txt break.before="1"><ins xml:space="preserve">This is an <bi>unofficial</bi> version of a reprint of this Act that incorporates all proposed amendments to the Act included in the Mineral and Energy Resources and Other Legislation Amendment Bill 2020. This indicative reprint has been prepared for information only—<bi>it is not an authorised reprint of the Act</bi>.</ins></txt><txt break.before="1"><ins/></txt></block><block><txt break.before="1"><ins xml:space="preserve">Amendments to this Act are also included in the Natural Resources and Other Legislation (GDA2020) Amendment Bill 2019. These proposed amendments are not included in this indicative reprint.</ins></txt><txt break.before="1"><ins/></txt></block><block><txt break.before="1"><ins xml:space="preserve">The point-in-time date for this indicative reprint is the introduction date for the Mineral and Energy Resources and Other Legislation Amendment Bill 2020—4 February 2020.</ins></txt><txt break.before="1"><ins/></txt></block><block><txt break.before="1"><ins xml:space="preserve">Detailed information about indicative reprints is available on the <b>Information</b> page of this website.</ins></txt><txt break.before="1"><ins/></txt></block></statusrecord></coverdata><wrapper><front guid="_eb23dc96-42eb-4748-bb67-fa4fc760d2f7" id="frnt"><shorttitle guid="_9fb7f945-9e2f-439b-b759-5b7b6d145d40" id="frnt-st">Greenhouse Gas Storage Act 2009</shorttitle><longtitle guid="_7484bcf5-fc4f-425a-932f-d8288cb3cbec" id="frnt-lt"><block><txt break.before="1">An Act to facilitate greenhouse gas geological storage</txt></block></longtitle></front><body numbering.style="manual"><chapter affected.by.uncommenced="0" guid="_d1323bd4-5aad-4739-a9b8-a677f5584dc2" id="ch.1"><no>Chapter 1</no><heading guid="_8096b8a5-f40e-4d7d-9041-9347e359e2f7" id="ch.1-he">Preliminary</heading><part affected.by.uncommenced="0" guid="_6e1f64b8-b56d-49a6-bdc7-0c3876614fb0" id="ch.1-pt.1"><no>Part 1</no><heading guid="_69f55923-f981-4fc7-b3a5-3e627fe59fca" id="ch.1-pt.1-he">Introduction</heading><clause affected.by.uncommenced="0" guid="_fcf31b06-0db1-48b0-9431-6327127bfd14" id="sec.1" provision.type="other" spent.amends="0"><no>1</no><heading guid="_3465c2d5-d1ae-41d6-abe6-8e6e0139ee69" id="sec.1-he">Short title</heading><block><txt break.before="1">This Act may be cited as the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="yes">Greenhouse Gas Storage Act 2009</name></legref>.</txt></block></clause><clause affected.by.uncommenced="0" guid="_e6c28ec8-5a79-467b-81b6-43b8244db1c9" id="sec.2" provision.type="other" spent.amends="0"><no>2</no><heading guid="_09e1dd7d-01bb-452e-97c8-0c1cd293c754" id="sec.2-he">Commencement</heading><block><txt break.before="1"><intref check="valid" refid="ch.2" target.guid="_60f42d8e-8fdb-4c76-a1e6-d0c7ad27b9d4">Chapters 2</intref> and <intref check="valid" refid="ch.3" target.guid="_4c6bae05-4d64-4dbf-a4f3-a2736db63437">3</intref> commence on a day to be fixed by proclamation.</txt></block></clause></part><part affected.by.uncommenced="0" guid="_367b688e-0954-45cc-8569-b673495fa9d2" id="ch.1-pt.2"><no>Part 2</no><heading guid="_5ab7f087-c2bb-41a1-9b3f-22197a700aa6" id="ch.1-pt.2-he">Purposes and application of Act</heading><clause affected.by.uncommenced="0" guid="_c8cbdc87-e0f4-4846-88f1-bdbf0c4f550b" id="sec.3" provision.type="other" spent.amends="0"><no>3</no><heading guid="_9fbe7cf2-2c41-4d73-822c-9e620e411265" id="sec.3-he">Purposes of Act and their achievement</heading><subclause affected.by.uncommenced="0" guid="_93b1ee49-fa77-4fe7-a3c3-7b567693c0d7" id="sec.3-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The main purpose of this Act is to help reduce the impact of greenhouse gas emissions on the environment.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_712cd2a4-a87c-4c27-b740-5a552e06586f" id="sec.3-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The main purpose is achieved principally by facilitating the process called greenhouse gas geological storage, also called greenhouse gas storage (<defterm guid="_2da97ba1-0a30-440c-b5c8-36d1124b0c17" id="sec.3-def.GHGstorage" type="definition">GHG storage</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_be9e7cc0-62a6-49d1-bd40-1dec94df660d" id="sec.3-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">This Act facilitates GHG storage by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7d4c71a0-f8ad-4835-9236-49f71c9ce608" id="sec.3-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">providing for the granting of authorities (called ‘GHG authorities’) to explore for or use underground geological formations or structures to store carbon dioxide, or carry out related activities; and</txt></block></li><li guid="_3f825b0f-3a44-40c7-8916-ce5799498183" id="sec.3-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">creating a regulatory system for the carrying out of activities relating to GHG authorities.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d2686d98-8925-460c-ae8f-46f01b892ad9" id="sec.3-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Other purposes of this Act are to ensure the following for the carrying out of the activities—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a1cd1e52-febe-4000-a3aa-2e9f99d81290" id="sec.3-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">minimisation of conflict with other land uses;</txt></block></li><li guid="_addd37b7-08d8-4c3d-8a22-1f63b09e60ef" id="sec.3-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">constructive consultation with people affected by the activities;</txt></block></li><li guid="_b185c160-7269-4c55-8480-4c09166326b6" id="sec.3-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">appropriate compensation for owners or occupiers adversely affected by the activities;</txt></block></li><li guid="_e1c64eff-f449-427f-940b-e80a8527c773" id="sec.3-ssec.4-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">responsible land and resource management.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_9c345801-c6a3-4a5e-943c-5f3a0d88039e" id="sec.4" provision.type="other" spent.amends="0"><no>4</no><heading guid="_1a456cb9-0714-4235-a223-a5ee2452536e" id="sec.4-he">Facilitation of Act by <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">Petroleum and Gas (Production and Safety) Act 2004</name></legref></heading><block><txt break.before="1">The <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="yes">Petroleum and Gas (Production and Safety) Act 2004</name></legref> (the <defterm guid="_f2c01a23-e57c-44d6-bfe2-73c9cc1df4ce" id="def.PGAct" type="definition">P&#38;G Act</defterm>) also facilitates the operation of this Act by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d31832e6-a3c5-4630-9404-62203bdcd131" id="sec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">providing for survey licences under that Act to be able to be granted for potential GHG stream pipelines; and</txt></block></li><li guid="_c607519c-5b25-49b6-a403-a3a4538edf63" id="sec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">providing for pipeline licences under that Act to be able to be granted for GHG streams; and</txt></block></li><li guid="_afea94c3-46c6-43f5-9186-7ff00ebadaa1" id="sec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">applying <legref check="valid" jurisd="QLD" refid="ch.9" target.doc.id="act-2004-025" target.guid="_e115e3d8-9707-4c5d-b3e6-be71f8d522ee" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">chapter 9</legref> of that Act (the <defterm guid="_9413d250-8b44-48a1-9d4d-0bdf13ea55df" id="sec.4-def.PGActsafetyprovisions" type="definition">P&#38;G Act safety provisions</defterm>) to particular authorised activities for GHG authorities; and</txt></block></li><li guid="_8f6c1ece-bf09-404b-9afe-89f611265488" id="sec.4-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">applying its provisions about investigations and some of its provisions about enforcement to authorised activities for GHG authorities.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_f61c056b-118f-4d79-9b17-15f97f55ef2f" id="sec.5" provision.type="other" spent.amends="0"><no>5</no><heading guid="_118713c3-f2d8-4c52-a87b-bb7e4f1181a4" id="sec.5-he">Act binds all persons</heading><subclause affected.by.uncommenced="0" guid="_e3590518-ae06-44b8-92c2-4c2611fc7110" id="sec.5-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This Act binds all persons, including the State, and to the extent the legislative power of the Parliament permits, the Commonwealth and the other States.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_737669bc-a644-40a0-9bc9-87fcb98f8db0" id="sec.5-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the Commonwealth or a State can not be prosecuted for an offence against this Act.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_5499cdac-3878-4fd2-a06f-30ccdf1f0295" id="sec.6" provision.type="other" spent.amends="0"><no>6</no><heading guid="_a68dfce1-6ef3-49b0-9820-f5a64ab90a4b" id="sec.6-he">Application of Act to coastal waters of the State</heading><subclause affected.by.uncommenced="0" guid="_469f4372-a2fe-4f58-b59a-8bbe1910cb96" id="sec.6-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This Act applies to the coastal waters of the State as if the coastal waters of the State were part of the State.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_24a110c0-613f-45e1-a65c-c3a1868de6e8" id="sec.6-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, this Act does not apply to the adjacent area under the <legref check="valid" jurisd="QLD" target.doc.id="act-1982-022" target.version.series="2d2296dc-4b3d-4b9d-b087-19dba1900a67" type="act"><name emphasis="yes">Petroleum (Submerged Lands) Act 1982</name></legref>.</txt><note guid="_229116f5-c382-4b07-84a1-88c095b63e74" id="sec.6-ssec.2-note" type="example"><heading guid="_9b9b6368-ca20-4ab2-b5f4-7d295db6bd84" id="sec.6-ssec.2-note-he">Note—</heading><block><txt break.before="1">The definition of the <defterm guid="_d29c75f1-dbe8-47aa-bf18-5ca482617e78" type="mention">adjacent area</defterm> in the <legref check="valid" jurisd="QLD" target.doc.id="act-1982-022" target.version.series="2d2296dc-4b3d-4b9d-b087-19dba1900a67" type="act"><name emphasis="yes">Petroleum (Submerged Lands) Act 1982</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.4" target.doc.id="act-1982-022" target.guid="_9ef73f64-9028-4856-9f5a-9ca5dcf6adc5" target.version.series="2d2296dc-4b3d-4b9d-b087-19dba1900a67" type="act">section 4</legref><legref check="invalid" jurisd="QLD" type="act">(1)</legref> is extended for pipelines under that Act, <legref check="valid" jurisd="QLD" refid="pt.3" target.doc.id="act-1982-022" target.guid="_f7264560-8fa5-459b-996a-5524dfd9401e" target.version.series="2d2296dc-4b3d-4b9d-b087-19dba1900a67" type="act">part 3</legref>, <legref check="valid" jurisd="QLD" refid="pt.3-div.4" target.doc.id="act-1982-022" target.guid="_85ba2294-3a7d-4b12-97dd-4826d7b4dcff" target.version.series="2d2296dc-4b3d-4b9d-b087-19dba1900a67" type="act">division 4</legref>. The provisions effectively cover pipelines in the coastal waters of the State.</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_bbbf3ed6-b31d-4dd9-9be2-6bbd521a3a0e" id="sec.7" provision.type="other" spent.amends="0"><no>7</no><heading guid="_53651877-df25-4a1a-8e1f-18f30e47f34f" id="sec.7-he">Relationship with <legref check="valid" jurisd="QLD" target.doc.id="act-1992-020" target.version.series="5a5e324b-388d-450f-843c-b363ee68996c" type="act"><name emphasis="no">Nature Conservation Act 1992</name></legref></heading><block><txt break.before="1">This Act is subject to the <legref check="valid" jurisd="QLD" target.doc.id="act-1992-020" target.version.series="5a5e324b-388d-450f-843c-b363ee68996c" type="act"><name emphasis="yes">Nature Conservation Act 1992</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.27" target.doc.id="act-1992-020" target.guid="_01ee9ee2-da0a-472b-acd4-b862f349600a" target.version.series="5a5e324b-388d-450f-843c-b363ee68996c" type="act">sections 27</legref> and <legref check="valid" jurisd="QLD" refid="sec.70QA" target.doc.id="act-1992-020" target.guid="_9da441d1-0dd0-4d22-9202-e77c603f721d" target.version.series="5a5e324b-388d-450f-843c-b363ee68996c" type="act">70QA</legref>.</txt><note guid="_393dc3da-1da5-4f7e-9104-a4a3860c56a4" id="sec.7-note" type="editorial"><heading guid="_762461f5-1ae1-4a47-a1ec-82a328f6c825" id="sec.7-note-he">Editor’s note—</heading><block><txt break.before="1"><legref check="valid" jurisd="QLD" target.doc.id="act-1992-020" target.version.series="5a5e324b-388d-450f-843c-b363ee68996c" type="act"><name emphasis="yes">Nature Conservation Act 1992</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.27" target.doc.id="act-1992-020" target.guid="_01ee9ee2-da0a-472b-acd4-b862f349600a" target.version.series="5a5e324b-388d-450f-843c-b363ee68996c" type="act">sections 27</legref> (Prohibition on mining, geothermal activities and GHG storage activities) and <legref check="valid" jurisd="QLD" refid="sec.70QA" target.doc.id="act-1992-020" target.guid="_9da441d1-0dd0-4d22-9202-e77c603f721d" target.version.series="5a5e324b-388d-450f-843c-b363ee68996c" type="act">70QA</legref> (Prohibition on mining, geothermal activities and GHG storage activities in forest reserves)</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_8c08d754-0e8e-43d9-8f6a-74d36a57a0b1" id="sec.8" provision.type="other" spent.amends="0"><no>8</no><heading guid="_3901daef-c02c-4327-9786-8b2b0d24fec1" id="sec.8-he">Relationship with <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref> and principal mining and petroleum Acts</heading><block><txt break.before="1">The relationship between this Act and the following <legref check="invalid" jurisd="QLD" type="act">Acts</legref> is provided for under <intref check="valid" refid="ch.4" target.guid="_faefc638-342e-43b0-a5ed-6ae7a9f9a690">chapter 4</intref>, <intref check="valid" refid="ch.4-pt.2" target.guid="_34087819-2d45-4d5f-b488-87c8e6b49923">parts 2</intref> to <intref check="valid" refid="ch.4-pt.8" target.guid="_79a3d64a-5be9-4717-a261-e8880b077421">8</intref> and—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dac86537-cf86-45be-8fe9-f229e4d4d5bf" id="sec.8-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref>—<legref check="valid" jurisd="QLD" refid="ch.5" target.doc.id="act-2010-031" target.guid="_18ab3134-f9ef-4b7d-a156-de3b91cceaa3" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act">chapter 5</legref>, <legref check="valid" jurisd="QLD" refid="ch.5-pt.2" target.doc.id="act-2010-031" target.guid="_08438867-b8b7-44d6-ab9f-f65c25999879" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act">parts 2</legref> to <legref check="valid" jurisd="QLD" refid="ch.5-pt.8" target.doc.id="act-2010-031" target.guid="_5dfc24b5-216d-47a6-9a5e-f272d77f43f3" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act">8</legref> of that Act;</txt></block></li><li guid="_37208f16-9cd2-4f19-a2b3-4940ec29d5cb" id="sec.8-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>—<legref check="valid" jurisd="QLD" refid="ch.9" target.doc.id="act-1989-110" target.guid="_644f1d86-4673-4637-b599-a90421be58d4" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">chapter 9</legref> of that Act;</txt></block></li><li guid="_d24da411-1bba-4431-b543-59a05c07e23e" id="sec.8-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">for the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>—<legref check="valid" jurisd="QLD" refid="sec.40" target.doc.id="act-1923-026" target.guid="_e3d536bb-8fe2-4e49-962a-29a2955f2ba7" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act">section 40</legref><legref check="invalid" jurisd="QLD" type="act">(1A)</legref> and <legref check="valid" jurisd="QLD" refid="pt.6FA" target.doc.id="act-1923-026" target.guid="_a768d18e-e903-4424-baa1-0c4a0e83a582" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act">part 6FA</legref> of that Act;</txt></block></li><li guid="_472cb083-d0fd-482d-8d79-1726ebb35503" id="sec.8-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">for the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref>—<legref check="valid" jurisd="QLD" refid="ch.3A" target.doc.id="act-2004-025" target.guid="_4864cab3-5ae5-49c9-aeb6-cdfaa85590af" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">chapter 3A</legref> of that Act.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_713d1b49-0034-4ac6-a634-b7e3043eadf8" id="sec.8AA" provision.type="other" spent.amends="0"><no>8AA</no><heading guid="_0da41a6f-bce1-4327-a79f-c712a7ba61ac" id="sec.8AA-he">Relationship with <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref></heading><block><txt break.before="1">The relationship between this Act and the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref> is provided for under the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.6" target.doc.id="act-2014-047" target.guid="_959e052d-dfd4-4033-a165-1e1e468f5490" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">section 6</legref>.</txt></block></clause><clause affected.by.uncommenced="0" guid="_bb667bab-8e3b-4db5-880b-ddf052325660" id="sec.8A" provision.type="other" spent.amends="0"><no>8A</no><heading guid="_01b5df6b-04be-4c93-9dde-02a99c0db18b" id="sec.8A-he">Declaration for Commonwealth Act</heading><block><txt break.before="1">A GHG authority is declared not to be personal property under the <legref check="invalid" jurisd="CTH" type="act"><name emphasis="yes">Personal Property Securities Act 2009</name> (Cwlth)</legref>.</txt></block></clause><clause affected.by.uncommenced="0" guid="_030f346d-f4d7-4d2e-993f-a74fb8e8c8ce" id="sec.9" provision.type="other" spent.amends="0"><no>9</no><heading guid="_39a535c4-2f6b-4ee3-a9e4-1bfddf817b5e" id="sec.9-he">Act does not affect other rights or remedies</heading><subclause affected.by.uncommenced="0" guid="_dbc56695-85d3-483f-8dc9-cb21429d1c54" id="sec.9-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.269" target.guid="_3c9ceef4-83ab-42cf-9742-82906ed7c60e">sections 269</intref>, <intref check="valid" refid="sec.338A" target.guid="_8d882311-e729-46d8-99e8-36180bbf1082">338A</intref> and <intref check="valid" refid="sec.425" target.guid="_50bbaecc-2419-452c-a599-17f38f0af193">425</intref> this Act does not affect or limit a civil right or remedy that exists apart from this Act, whether at common law or otherwise.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_33492b62-5452-4a70-a647-51f65e1bd997" id="sec.9-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.9-ssec.1" target.guid="_dbc56695-85d3-483f-8dc9-cb21429d1c54">subsection (1)</intref>, compliance with this Act does not necessarily show that a civil obligation that exists apart from this Act has been satisfied or has not been breached.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bef39219-be38-4973-9f9a-d25c9f6ee5f4" id="sec.9-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In addition, a breach of an obligation under this Act does not of itself give rise to an action for breach of statutory duty or another civil right or remedy.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_adeeeebc-4491-4de8-a9cc-9be7aedff287" id="sec.9-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">This Act does not limit a court’s powers under the <legref check="valid" jurisd="QLD" target.doc.id="act-1992-048" target.version.series="6bcfc277-3e30-47e3-a34f-9379b3cd284a" type="act"><name emphasis="yes">Penalties and Sentences Act 1992</name></legref> or another law.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_ec9eee59-18ab-4b1e-a27c-0d592d5c2bb9" id="ch.1-pt.3"><no>Part 3</no><heading guid="_44dd9ba3-e03e-44aa-9b43-1141821cdf95" id="ch.1-pt.3-he">Interpretation</heading><division affected.by.uncommenced="0" guid="_32fc4970-1167-4f41-a904-14be25254c46" id="ch.1-pt.3-div.1"><no>Division 1</no><heading guid="_52507626-8791-4496-98d3-195b4855e794" id="ch.1-pt.3-div.1-he">Dictionary</heading><clause affected.by.uncommenced="0" guid="_2d2cce29-ef0c-4714-8765-78d3faa9db27" id="sec.11" provision.type="other" spent.amends="0"><no>11</no><heading guid="_e6b3573d-1054-4e01-a909-627edb472962" id="sec.11-he">Definitions</heading><block><txt break.before="1">The dictionary in <intref check="valid" refid="sch.2" target.guid="_701bbbe5-2cf2-45ee-ab66-e29d63e627ef">schedule 2</intref> defines particular words used in this Act.</txt></block></clause></division><division affected.by.uncommenced="0" guid="_a998f816-4293-4b27-8125-44bc2fc330a9" id="ch.1-pt.3-div.2"><no>Division 2</no><heading guid="_7f89fdb5-ea71-485f-ac58-1423d37b2af0" id="ch.1-pt.3-div.2-he">Key definitions</heading><clause affected.by.uncommenced="0" guid="_a1370cf9-45f5-4d33-9ea0-422705c805d6" id="sec.12" provision.type="other" spent.amends="0"><no>12</no><heading guid="_8333bcc8-4978-4320-8a32-18fb66f57959" id="sec.12-he">What is a <defterm guid="_75a9154a-9d52-48b1-82a7-f2d7a01c80d7" id="sec.12-def.GHGstream" type="mention">GHG stream</defterm></heading><subclause affected.by.uncommenced="0" guid="_a53998e7-8edc-4026-a211-871336d66e35" id="sec.12-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A <defterm guid="_482c4976-581c-4b53-87a4-ed1c691fca15" id="sec.12-def.GHGstream-oc.2" type="definition">GHG stream</defterm> is a stream of carbon dioxide or a substance that overwhelmingly consists of carbon dioxide.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7f8b442f-bca9-48a6-b9e8-7022b31022a3" id="sec.12-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The stream may be in a gaseous or liquid state.</txt><note guid="_b39fc3e1-2f48-42e4-9de5-c00c155157f1" id="sec.12-ssec.2-note" type="example"><heading guid="_52d554bc-634e-433d-85c0-d84aaf5b823a" id="sec.12-ssec.2-note-he">Note—</heading><block><txt break.before="1">The lawful use by a GHG tenure holder of any particular GHG stream for injection or GHG stream storage is subject to requirements under chapters 2 and 3 and to approval of the relevant work program or development plan.</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_48e73ce5-6780-40b1-8f6a-4daaf390f519" id="sec.13" provision.type="other" spent.amends="0"><no>13</no><heading guid="_0173bd5c-d61a-4599-9130-6022bb94f772" id="sec.13-he">What is a <defterm guid="_bec576a7-c726-48bf-93b4-8f23a9501e32" id="sec.13-def.GHGstreamstoragesite" type="mention">GHG stream storage site</defterm></heading><block><txt break.before="1">A <defterm guid="_89ed4add-45a2-42c3-97ea-f0b9deb19623" id="def.GHGstreamstoragesite" type="definition">GHG stream storage site</defterm> is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4f6dd114-a751-4e0f-b1b0-d780d79ab60e" id="sec.13-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the spatial extent of an underground geological formation or structure that is suitable to store a GHG stream (a <defterm guid="_c27e3aff-de06-4343-a075-44ba593f920e" id="sec.13-def.GHGstoragereservoir" type="definition">GHG storage reservoir</defterm>); and</txt></block></li><li guid="_c085d3c7-31ab-476b-a95b-656f5a58dac2" id="sec.13-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the site at which a GHG stream is or may be injected into the GHG storage reservoir.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_ec654683-7871-4f9f-a659-0b1618b46e90" id="sec.14" provision.type="other" spent.amends="0"><no>14</no><heading guid="_58f35c21-0e41-4db1-a45d-7d9252c45280" id="sec.14-he">What is <defterm guid="_3dc3ddcd-aff5-4481-84db-24d600dd8839" id="sec.14-def.GHGstreamstorage" type="mention">GHG stream storage</defterm></heading><subclause affected.by.uncommenced="0" guid="_6cbfcb46-a285-4125-9dea-20b586286e94" id="sec.14-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0"><defterm guid="_e6c5d28c-7d09-49d8-b289-7bb364d160d4" id="sec.14-def.GHGstreamstorage-oc.2" type="definition">GHG stream storage</defterm> is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e85e3af2-139c-479a-8f3b-2e10daa6f83f" id="sec.14-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the process of injecting a GHG stream into a GHG storage reservoir for the purpose of storing the injected GHG stream in the reservoir; and</txt></block></li><li guid="_b1d16708-87ef-46a1-9875-47218e93f8c4" id="sec.14-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">monitoring the behaviour of the injected GHG stream in the reservoir.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b2b350be-9489-420a-9209-41e01421876e" id="sec.14-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">To remove any doubt, it is declared that injecting a GHG stream for the purpose of enhanced petroleum recovery authorised under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> or the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref> is not GHG stream storage.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_04b46051-2b4b-4560-b9ae-98ffe19c1bbe" id="sec.15" provision.type="other" spent.amends="0"><no>15</no><heading guid="_04b0d8be-da56-48ed-90cc-ec676b83e713" id="sec.15-he">What is <defterm guid="_1ca554c9-133a-422c-9c32-5106465f8a65" id="sec.15-def.GHGstorageexploration" type="mention">GHG storage exploration</defterm></heading><block><txt break.before="1"><defterm guid="_11264345-075e-4c0e-b771-a5571686030b" id="def.GHGstorageexploration" type="definition">GHG storage exploration</defterm> is carrying out an activity for the purpose of finding GHG stream storage sites.</txt></block></clause><clause affected.by.uncommenced="0" guid="_cfee6ff8-573b-4720-a2f5-0b4560578b63" id="sec.16" provision.type="other" spent.amends="0"><no>16</no><heading guid="_3c0bc866-3978-4eb9-896d-c27ebb609e2f" id="sec.16-he">What is <defterm guid="_9aba31fd-1896-49af-9cd5-c8242dbd872a" id="sec.16-def.GHGstorageinjectiontesting" type="mention">GHG storage injection testing</defterm></heading><block><txt break.before="1"><defterm guid="_ea57dd1c-74a7-4cbe-b479-40cf85dd2806" id="def.GHGstorageinjectiontesting" type="definition">GHG storage injection testing</defterm> is the evaluation or testing of an underground geological formation or structure for GHG stream storage by injecting carbon dioxide or water into it.</txt></block></clause><clause affected.by.uncommenced="0" guid="_79c2b709-2af5-487a-92e9-efe08fcd600c" id="sec.17" provision.type="other" spent.amends="0"><no>17</no><heading guid="_863182c5-3b97-491f-9288-e297a8e06ab0" id="sec.17-he">What is a <defterm guid="_35333bf8-fec2-428d-b093-19f126ca0228" id="sec.17-def.GHGstreampipeline" type="mention">GHG stream pipeline</defterm></heading><subclause affected.by.uncommenced="0" guid="_a76ed26f-bc3f-4486-9a58-7ddb90c88a90" id="sec.17-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A <defterm guid="_82b1eec2-5992-478d-b13d-0b08f2ff122d" id="sec.17-def.GHGstreampipeline-oc.2" type="definition">GHG stream pipeline</defterm> is a pipe or system of pipes for transporting a GHG stream for GHG stream storage.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c7e745e4-2493-47e0-9b93-bde9784574ad" id="sec.17-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A reference to a <defterm guid="_a4c3d364-f9d2-4629-8b1b-73599d73d86d" id="sec.17-def.GHGstreampipeline-oc.3" type="definition">GHG stream pipeline</defterm> includes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6bc5ea18-b2b5-4f25-9e9d-2d99fcc11279" id="sec.17-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a part of the pipeline; and</txt></block></li><li guid="_463fc7c4-57f7-4316-8b4e-6f159fd0bbf4" id="sec.17-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a thing connected to or associated with the pipeline that is necessary for its operation.</txt></block></li></list><note guid="_cdfb36ef-faaf-4a6f-920e-1c5b58157a4d" id="sec.17-ssec.2-note" type="example"><heading guid="_969b306c-d8dc-48bb-a3e8-dd67b0b70682" id="sec.17-ssec.2-note-he">Examples of things that may be included in a reference to a pipeline—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_038d65d3-408e-48fe-84bf-742e867771d4" id="sec.17-ssec.2-note-para1" provision.type="other"><no>•</no><block><txt break.before="0">meter stations, scraper stations, valve stations, pumping stations or compressor stations</txt></block></li><li guid="_75590dad-a073-4aaa-b277-dbe5b3aed057" id="sec.17-ssec.2-note-para1-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">plant and equipment, machinery and tanks</txt></block></li><li guid="_ce5d78c3-97a6-406e-aa7f-f37a135d7c87" id="sec.17-ssec.2-note-para1-oc.3" provision.type="other"><no>•</no><block><txt break.before="0">corrosion protection apparatus</txt></block></li><li guid="_1017b56c-c7b8-4794-a3d7-c34b9b7c0a9d" id="sec.17-ssec.2-note-para1-oc.4" provision.type="other"><no>•</no><block><txt break.before="0">communications equipment and towers</txt></block></li></list></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a40ec099-1a0e-45e8-aeda-9b4fce944dcb" id="sec.18" provision.type="other" spent.amends="0"><no>18</no><heading guid="_9736c915-a767-47bb-9d18-d7cf0025d5af" id="sec.18-he">Types of authority under Act</heading><subclause affected.by.uncommenced="0" guid="_beb8d1b4-a031-4034-b48d-a432acd20d58" id="sec.18-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The types of authority under this Act are—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5174170f-7a63-4a86-8d23-5a27683711e0" id="sec.18-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a <defterm guid="_20b9ac1e-4f68-4999-88da-304a588f4a9e" id="sec.18-ssec.1-def.GHGexplorationpermit" type="definition">GHG exploration permit</defterm> (also called a <defterm guid="_180a3a9b-73b0-4da5-a403-8d41ac01ca81" id="sec.18-ssec.1-def.GHGpermit" type="definition">GHG permit</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_271ad09c-5117-494a-8c90-eb54549b015a" id="sec.18-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">granted under <intref check="valid" refid="sec.40" target.guid="_289f7458-d97e-4fae-b566-d733e8a7235e">section 40</intref>; or</txt></block></li></list><note guid="_f5bd31c1-0b7e-4599-980f-eaa7ec77cd8d" id="sec.18-ssec.1-para1.a-note" type="example"><heading guid="_edf101bc-48b7-4839-8a36-5505f8e3f95b" id="sec.18-ssec.1-para1.a-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.431" target.guid="_bf9e103b-1e92-4802-b147-9cb89ddac571">sections 431</intref> (Conversion of Zerogen’s P&#38;G Act ATPs) and <intref check="valid" refid="sec.432" target.guid="_41e29d0b-5f26-4bb0-911e-79aac5de9b37">432</intref> (New GHG permit for Zerogen).</txt></block></note><list number.type="manual" unnumbered.indent="0"><li guid="_7d36ce7f-b36f-41b6-9347-32a178dc6a44" id="sec.18-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">continued in force under <intref check="valid" refid="sec.95" target.guid="_c9e8465d-9281-45e0-8784-3f3783a65591">section 95</intref> or <intref check="valid" refid="sec.116" target.guid="_3109b454-7b41-4717-b7eb-18317e22a80e">116</intref>; or</txt></block></li><li guid="_3b9a001f-ad0d-4bea-9a4f-925c7c3b61b6" id="sec.18-ssec.1-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">renewed under <intref check="valid" refid="sec.96" target.guid="_14839d85-340a-4bb0-ad78-df2191f855cf">section 96</intref>; and</txt></block></li></list></block></li><li guid="_788679a0-38bc-442b-ae35-7470ef517295" id="sec.18-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a <defterm guid="_b2fc933a-7ec1-460a-916c-6fd19dcbada0" id="sec.18-ssec.1-def.GHGinjectionandstoragelease" type="definition">GHG injection and storage lease </defterm>(also called a <defterm guid="_e056315e-aae6-4889-97a9-721130389ec9" id="sec.18-ssec.1-def.GHGlease" type="definition">GHG lease</defterm>) granted under <intref check="valid" refid="sec.117" target.guid="_f47d958c-f1e6-4adc-bc6f-f1e9d5df4606">section 117</intref> or <intref check="valid" refid="sec.130" target.guid="_15ecfe70-1880-44a0-ab4b-14e663a921dc">130</intref>; and</txt></block></li><li guid="_974aedc5-5d16-4b4c-8093-15de39087893" id="sec.18-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a <defterm guid="_2207e0f5-8ff8-43e2-a159-df777e791045" id="sec.18-ssec.1-def.GHGinjectionandstoragedataacquisitionauthority" type="definition">GHG injection and storage data acquisition authority </defterm>(also called a <defterm guid="_49e8ba9a-35d6-43d4-b7b7-ae12c147bc28" id="sec.18-ssec.1-def.GHGdataacquisitionauthority" type="definition">GHG data acquisition authority</defterm>) granted under <intref check="valid" refid="sec.235" target.guid="_1ce2f877-d875-4bea-8f7a-92c49c29a63a">section 235</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_58cbbe7a-3e65-48a3-b1fa-e925a56cfead" id="sec.18-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">GHG permits and GHG leases are collectively referred to as a <defterm guid="_cb8e5c82-8850-4c49-a5f4-31fb627c4915" id="sec.18-def.GHGtenure" type="definition">GHG tenure</defterm>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4539587a-f259-4f0e-94ba-fb98e362a6f4" id="sec.18-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">All authorities under this Act are collectively referred to as a <defterm guid="_fcb6af53-c0a0-490f-aa3a-fdc7b29de530" id="sec.18-def.GHGauthority" type="definition">GHG authority</defterm>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_125e1bbf-5f2c-4e4f-8a96-d47467da0299" id="sec.19" provision.type="other" spent.amends="0"><no>19</no><heading guid="_1e4b89ec-d485-44a3-957b-0f4ef5faf7ec" id="sec.19-he">Who is an <defterm guid="_7534a87d-8d91-4042-8b6e-823491910654" id="sec.19-def.eligibleperson" type="mention">eligible person</defterm></heading><block><txt break.before="1">An <defterm guid="_9523ca1b-3ae7-40ed-8246-942a6ab95533" id="def.eligibleperson" type="definition">eligible person</defterm> is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2edd4d65-c290-4507-9272-4c45b80f25ec" id="sec.19-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an adult; or</txt></block></li><li guid="_963ceec6-7d0d-4545-a8f5-f6c11fd00b22" id="sec.19-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a company or a registered body under the <legref check="invalid" jurisd="CTH" type="act"><name emphasis="no">Corporations Act</name></legref>; or</txt></block></li><li guid="_ec16aed7-d1d8-4f00-a8a7-ef31b620ddb3" id="sec.19-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a government owned corporation.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_6a183a3b-a88c-4f09-9eea-0fc8117ffb80" id="sec.20" provision.type="other" spent.amends="0"><no>20</no><heading guid="_b9a60c97-f86e-409f-bca9-7cf7f457b2eb" id="sec.20-he">What are the <defterm guid="_a5978ff2-1ce3-4fa4-af74-7ac8fe923306" id="sec.20-def.conditions" type="mention">conditions</defterm> of a GHG authority</heading><subclause affected.by.uncommenced="0" guid="_67d546d8-d857-4738-83ba-c49b78a6f14d" id="sec.20-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The <defterm guid="_b2cbf605-4de1-4792-b10a-53387fa7b4be" id="sec.20-def.conditions-oc.2" type="definition">conditions</defterm> of a GHG authority are—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f15e312b-616d-46ee-b1fa-f9bbae037d9b" id="sec.20-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the conditions stated in it from time to time; and</txt></block></li><li guid="_6a19e0c3-4709-4192-9a06-fa78107a2fc1" id="sec.20-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the GHG authority holder’s obligations under chapters 2 to 5; and</txt></block></li><li guid="_2dcc680b-e58e-4999-85f1-3e9aa916acb0" id="sec.20-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">any condition of the GHG authority under chapters 2 to 5; and</txt></block></li><li guid="_d69ab5fd-f070-41e6-aa67-0e4acef2b4eb" id="sec.20-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a condition that the holder must ensure each person acting for the holder who carries out an authorised activity for the GHG authority complies with its conditions to the extent they apply to the carrying out of the activity.</txt><note guid="_e2f56ec8-7212-4a16-b47f-433791177029" id="sec.20-ssec.1-para1.d-note" type="example"><heading guid="_0fb72446-821b-4d77-bbcb-5a02b8caec76" id="sec.20-ssec.1-para1.d-note-he">Note—</heading><block><txt break.before="1">For who may carry out an authorised activity for the holder, see <intref check="valid" refid="sec.338" target.guid="_c16ee708-a60f-49ac-9778-9fa426bc76e9">section 338</intref> (Who may carry out authorised activity for GHG authority holder).</txt></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_88215ea2-2785-4d6a-9e25-a4f02d4849d9" id="sec.20-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A condition mentioned in <intref check="valid" refid="sec.20-ssec.1" target.guid="_67d546d8-d857-4738-83ba-c49b78a6f14d">subsection (1)</intref><intref check="valid" refid="sec.20-ssec.1-para1.b" target.guid="_6a19e0c3-4709-4192-9a06-fa78107a2fc1">(b)</intref> or <intref check="valid" refid="sec.20-ssec.1-para1.c" target.guid="_2dcc680b-e58e-4999-85f1-3e9aa916acb0">(c)</intref> is a <defterm guid="_941aad76-7b80-4fb3-b3d3-a5ca77d13638" id="sec.20-def.mandatorycondition" type="definition">mandatory condition</defterm> of the GHG authority.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_66e89c23-a48e-45be-bcfa-e723cf1f7def" id="sec.21" provision.type="other" spent.amends="0"><no>21</no><heading guid="_66724a1d-9b31-4959-8e38-f1a4ff5068d0" id="sec.21-he">What are the <defterm guid="_b87c79b2-6f61-4256-8d17-1dbbf005fe17" id="sec.21-def.provisions" type="mention">provisions </defterm>of a GHG authority</heading><subclause affected.by.uncommenced="0" guid="_c38e14f8-20b8-46f6-8216-f7b650c8bfcc" id="sec.21-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A reference in this Act to a GHG authority includes a reference to its provisions.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f9343ca7-4192-4677-af85-cdd6d89ffe35" id="sec.21-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A reference in this Act to the provisions of a GHG authority is a reference to its mandatory or other conditions and anything written in it.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f5e8f03f-14b6-4884-a12b-43bc87e358d7" id="sec.22" provision.type="other" spent.amends="0"><no>22</no><heading guid="_8d0ddc47-1fb4-495c-91df-e3254f373b06" id="sec.22-he">What is an <defterm guid="_b71e3dc4-2849-426d-9dce-652e9ee79f4c" id="sec.22-def.authorisedactivity" type="mention">authorised activity</defterm> for a GHG authority</heading><block><txt break.before="1">An <defterm guid="_912a34bf-563f-4084-a86d-0f57f3892545" id="def.authorisedactivity" type="definition">authorised activity</defterm>, for a GHG authority, is an activity that its holder is under this Act or the authority, entitled to carry out in relation to the authority.</txt><note guid="_75b49bed-ac5a-4bff-9f28-d6ab45237456" id="sec.22-note" type="example"><heading guid="_65821a4d-8ff2-40ba-9e90-cff5c57c785e" id="sec.22-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_e350dc6c-63dd-4354-af51-f424bd3a8d7f" id="sec.22-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">The provisions of the GHG authority may restrict the carrying out of authorised activities. See <intref check="valid" refid="sec.41" target.guid="_34765540-0a08-4786-9832-e30b382f5132">sections 41</intref>, <intref check="valid" refid="sec.97" target.guid="_131d4a53-8bdd-4245-8975-392494a912da">97</intref>, <intref check="valid" refid="sec.120" target.guid="_fcda669d-b9d0-4f90-b99b-7bf477b46c2b">120</intref>, <intref check="valid" refid="sec.236" target.guid="_6bdb4ac1-2c6f-407e-ae24-244e12e561f6">236</intref> and <intref check="valid" refid="sec.379" target.guid="_7bb5ce56-1401-4239-84f9-bb0e4d600312">379</intref><intref check="valid" refid="sec.379-ssec.3" target.guid="_55e944a7-e1c5-4edc-85e6-d3d53e4f500b">(3)</intref>.</txt></block></li><li guid="_ffa817d4-0dd8-4040-80c5-6069a190dcf3" id="sec.22-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">The carrying out of authorised activities is subject to the restrictions and the holder’s rights and obligations under chapters 2 to 5. See <intref check="valid" refid="sec.337" target.guid="_59aac301-d73f-4729-a7c4-b4fd44a87dc3">section 337</intref>.</txt></block></li><li guid="_08019856-7968-44c0-980b-88f6f15ff82c" id="sec.22-note-para1.3" provision.type="other"><no>3</no><block><txt break.before="0">The carrying out of particular activities on particular land in a GHG authority’s area may not be authorised following the taking of the land under a resumption law. See <intref check="valid" refid="sec.369B" target.guid="_d9b1575e-7c2a-404c-9b3e-19f30c1ce1e6">section 369B</intref>.</txt></block></li></list></block></note></block></clause><clause affected.by.uncommenced="0" guid="_66f430f2-578a-4860-be3c-6385dad73b48" id="sec.23" provision.type="other" spent.amends="0"><no>23</no><heading guid="_bf684204-1d73-4ec9-b1cf-7ebc5277c6da" id="sec.23-he">What is a <defterm guid="_f5fa99ec-d068-4fbc-8486-b687c9da7679" id="sec.23-def.GHGstorageactivity" type="mention">GHG storage activity</defterm></heading><block><txt break.before="1">A <defterm guid="_a226d30f-191f-40be-9c74-7506a2b7b121" id="def.GHGstorageactivity" type="definition">GHG storage activity</defterm> is any authorised activity for any GHG authority, whether or not a GHG authority has been granted for the activity.</txt></block></clause><clause affected.by.uncommenced="0" guid="_1c719659-fcb8-4c2b-8de4-7cf04970e90c" id="sec.24" provision.type="other" spent.amends="0"><no>24</no><heading guid="_c9ed6243-45b4-4ef2-b49a-5b5e7a4ebefc" id="sec.24-he">What is a <defterm guid="_7dc22f38-07ed-4d49-9d1e-22f87e2d74cf" id="sec.24-def.workprogram" type="mention">work program</defterm> for a GHG permit</heading><subclause affected.by.uncommenced="0" guid="_f7157766-6142-493a-9f07-5b72a94e66cd" id="sec.24-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The <defterm guid="_f2496140-4aed-4c81-a73a-852d4ee0a2f1" id="sec.24-def.workprogram-oc.2" type="definition">work program</defterm> for a GHG permit is its current initial or later work program approved under <intref check="valid" refid="ch.2" target.guid="_60f42d8e-8fdb-4c76-a1e6-d0c7ad27b9d4">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.4" target.guid="_53fb6f4f-0594-47f9-8ba9-bcbacb27f25f">part 4</intref> as amended from time to time under that part.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6ffca209-1fe5-475b-ad63-dca278ea5df5" id="sec.24-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.24-ssec.1" target.guid="_f7157766-6142-493a-9f07-5b72a94e66cd">subsection (1)</intref>, the work program is current if the period to which the program applies has started and not ended.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7e0d4246-901b-4fcf-86fa-428043a4985c" id="sec.25" provision.type="other" spent.amends="0"><no>25</no><heading guid="_b42b1cdb-0022-47cc-86e3-c5c9a1e76426" id="sec.25-he">What is a <defterm guid="_a293cf3a-5e01-4ada-bdce-5b235df4f69d" id="sec.25-def.developmentplan" type="mention">development plan </defterm>for a GHG lease</heading><subclause affected.by.uncommenced="0" guid="_f3cd9d24-ebf7-4c1f-9473-489a3ea56f84" id="sec.25-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The <defterm guid="_029ad755-36b8-4f2c-8300-51fa4e210c32" id="sec.25-def.developmentplan-oc.2" type="definition">development plan</defterm> for a GHG lease is its current initial or later development plan approved under <intref check="valid" refid="ch.3" target.guid="_4c6bae05-4d64-4dbf-a4f3-a2736db63437">chapter 3</intref>, <intref check="valid" refid="ch.3-pt.5" target.guid="_75d19f56-2004-45c4-ae39-f178873a4bb6">part 5</intref> as amended from time to time under that part.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e15b27f9-44ff-4721-9edc-7b9182f3de78" id="sec.25-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.25-ssec.1" target.guid="_f3cd9d24-ebf7-4c1f-9473-489a3ea56f84">subsection (1)</intref>, the development plan is current if the period to which the plan applies has started and has not ended.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_51d5ebcf-f335-44c2-a05e-f563ea9a4e7f" id="sec.26" provision.type="other" spent.amends="0"><no>26</no><heading guid="_49487327-3558-4a29-bd1d-bc2b7f601706" id="sec.26-he">Graticulation of earth’s surface into <defterm guid="_b8df174c-3130-4ebb-9aae-d09db7e274a0" id="sec.26-def.blocks" type="mention">blocks</defterm> and <defterm guid="_31b54421-77c1-4b85-8dff-d0e152cbea04" id="sec.26-def.subblocks" type="mention">sub-blocks</defterm></heading><subclause affected.by.uncommenced="0" guid="_f8891c89-db8a-4c2f-a92d-19348eada766" id="sec.26-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A <defterm guid="_db9c1b53-0742-47f6-9f3e-0efc17e457c5" id="sec.26-def.block" type="definition">block</defterm> is the land resulting from a notional division of the earth’s surface—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_017b7ba3-c7d1-4f94-97cf-d866d3c9542b" id="sec.26-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">by 2 meridians of longitude 5 minutes apart, each meridian being a multiple of 5 minutes of longitude from the meridian of Greenwich; and</txt></block></li><li guid="_e833d355-b684-4b3e-bbaa-170e402687c0" id="sec.26-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">by 2 parallels of latitude 5 minutes apart, each parallel being a multiple of 5 minutes of latitude from the equator.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_968c6cd9-7ada-4e93-a44b-2ce35384048d" id="sec.26-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A <defterm guid="_c944fd38-0771-4721-8fe3-0bf57f39a6af" id="sec.26-def.subblock" type="definition">sub-block</defterm> is the land resulting from a notional division of a block into 25 areas, each sub-block being bounded by 2 meridians 1 minute of longitude apart and 2 parallels of latitude 1 minute of latitude apart.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_afaddde9-fb21-4131-9653-c26642f45f7b" id="sec.26-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Each block and sub-block must be identified in the way approved by the chief executive.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a6bf8c62-2e65-43fd-acff-0e537a548018" id="sec.26A" provision.type="other" spent.amends="0"><no>26A</no><heading guid="_bf1336f7-36fb-41a8-b9c9-3fad2959a695" id="sec.26A-he">What is a <defterm guid="_b5495c3f-32ab-49ef-8c94-32c606e7f40f" id="sec.26A-def.resourceAct" type="mention">resource Act</defterm></heading><block><txt break.before="1">A <defterm guid="_c624b424-11e9-4e00-bdb8-50e8bfde6260" id="def.resourceAct" type="definition">resource Act</defterm> is any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6086884d-5299-4690-9eb3-1454292f630d" id="sec.26A-para1" provision.type="other"><no>•</no><block><txt break.before="0">this Act;</txt></block></li><li guid="_55ab25d8-2228-4890-9628-ae6a74afb71d" id="sec.26A-para1-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref>;</txt></block></li><li guid="_d467031e-57a3-4fd5-8bfb-a8f2b370aa1e" id="sec.26A-para1-oc.3" provision.type="other"><no>•</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>;</txt></block></li><li guid="_3fa39f38-08e2-44c2-95fa-28ac9bce9be9" id="sec.26A-para1-oc.4" provision.type="other"><no>•</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>;</txt></block></li><li guid="_e7af356f-ef46-4235-882a-894d33bee906" id="sec.26A-para1-oc.5" provision.type="other"><no>•</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref>.</txt></block></li></list></block></clause></division></part><part affected.by.uncommenced="0" guid="_5e13821f-7ac1-4e37-a7be-12c0a3520dc1" id="ch.1-pt.4"><no>Part 4</no><heading guid="_d73b3e9e-4e5b-44e7-b610-092fef382768" id="ch.1-pt.4-he">State ownership of GHG storage reservoirs</heading><clause affected.by.uncommenced="0" guid="_295526f7-4158-4488-a875-3f8a57c2364e" id="sec.27" provision.type="other" spent.amends="0"><no>27</no><heading guid="_dfb88acc-3327-45ed-b197-2b344f31fc8b" id="sec.27-he">GHG storage reservoirs the property of the State</heading><subclause affected.by.uncommenced="0" guid="_72086d1e-1c18-4540-a431-0f54f8aa9305" id="sec.27-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">All GHG storage reservoirs in land in the State are and are taken always to have been the property of the State.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_66484360-e71d-4790-9f3c-c57554da8adc" id="sec.27-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">To remove any doubt, it is declared that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_abeca5e1-fbd5-4126-908f-37a351b215f0" id="sec.27-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a person does not acquire any property in a GHG storage reservoir or petroleum in it only because the person creates or discovers the reservoir; and</txt><note guid="_8572409a-2b18-49e0-aa60-fb10bd30bcaa" id="sec.27-ssec.2-para1.a-note" type="example"><heading guid="_25746c96-1c57-46b0-b69a-11bddda97c98" id="sec.27-ssec.2-para1.a-note-he">Note—</heading><block><txt break.before="1">For other provisions about the ownership of petroleum, see the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.26" target.doc.id="act-2004-025" target.guid="_bd4941a4-05b3-4308-8d5b-a56b88ad90a1" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">sections 26</legref> to <legref check="valid" jurisd="QLD" refid="sec.28" target.doc.id="act-2004-025" target.guid="_bb2a38cc-53d1-46c8-96a0-e3eed9e298a9" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">28</legref> and <legref check="valid" jurisd="QLD" refid="ch.2" target.doc.id="act-2004-025" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">chapter 2</legref>, <legref check="valid" jurisd="QLD" refid="ch.2-pt.6" target.doc.id="act-2004-025" target.guid="_55412cd7-ecff-4e2b-99fa-1c2290aac632" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">part 6</legref>, <legref check="valid" jurisd="QLD" refid="ch.2-pt.6-div.3" target.doc.id="act-2004-025" target.guid="_fdcb9028-dc52-4ad5-9359-62ed5afd2f91" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">division 3</legref>.</txt></block></note></block></li><li guid="_f3b0e941-8c84-4b68-a69f-81f9b1ee392b" id="sec.27-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0"><intref check="valid" refid="sec.27-ssec.1" target.guid="_72086d1e-1c18-4540-a431-0f54f8aa9305">subsection (1)</intref> applies whether or not the land is freehold or other land.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_4d9fe5b3-79d6-4065-a1fd-604d7198b63c" id="sec.27-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">This section applies despite any other Act, grant, title or other document in force from the commencement of this section.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c57e6d17-2bf0-4665-8294-0f8756fd5761" id="sec.27-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_76461611-df9f-46c0-baf5-1f5bbaaa8685" id="sec.27-ssec.4-def.theState_"><txt break.before="1"><defterm guid="_05c93d5b-acf6-40a3-a2f9-ab5faae779d3" id="sec.27-ssec.4-def.theState" type="definition">the State</defterm> does not include any of the adjacent area under the <legref check="valid" jurisd="QLD" target.doc.id="act-1982-022" target.version.series="2d2296dc-4b3d-4b9d-b087-19dba1900a67" type="act"><name emphasis="yes">Petroleum (Submerged Lands) Act 1982</name></legref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_4a2fd518-2bd5-4575-8669-5a7e9bf4741f" id="sec.28" provision.type="other" spent.amends="0"><no>28</no><heading guid="_96c89ced-eeed-471e-857b-bb88f6487d5b" id="sec.28-he">Reservation in land grants</heading><subclause affected.by.uncommenced="0" guid="_a3635305-83ae-43eb-9b74-bf9c1009f66a" id="sec.28-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to each grant under another Act of a right relating to land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_513332c8-9d10-47a8-8bbb-f3326308c7db" id="sec.28-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">This section applies whether the grant was made before or after the commencement of this section.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_70ae06e9-79fa-44d9-b5dc-18511b946448" id="sec.28-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The grant is taken to contain a reservation to the State of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1fe94377-318a-4134-8c0d-5aec962e8c2a" id="sec.28-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">all GHG storage reservoirs in the land, whenever created; and</txt></block></li><li guid="_bb57fc90-1c16-4a14-95e1-2d00662caee9" id="sec.28-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the exclusive right to do the following in relation to the land—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_045843a4-6048-498b-b4dc-af9c55dc11dd" id="sec.28-ssec.3-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">to enter and carry out any GHG storage activity;</txt></block></li><li guid="_029a44f8-c7b7-48ed-b243-a9a1f9543bf5" id="sec.28-ssec.3-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">to authorise under the provisions of this Act or another Act others to carry out any GHG storage activity;</txt></block></li><li guid="_c76b9d5f-924a-4d4f-a2d4-7acf9a5d0800" id="sec.28-ssec.3-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">to regulate under the provisions of this Act or another Act GHG storage activities carried out by others.</txt><note guid="_239bc6ce-761d-4d4d-ab1f-54721bfe862b" id="sec.28-ssec.3-para1.b-para2.iii-note" type="example"><heading guid="_38c8c061-8763-4ffc-b876-91f8f9ee00dc" id="sec.28-ssec.3-para1.b-para2.iii-note-he">Note—</heading><block><txt break.before="1">See however, <intref check="valid" refid="sec.420" target.guid="_0ce806ac-cb36-4dbc-b5bd-f8ef9441220b">section 420</intref> (Provision for entry by State to carry out GHG storage activity).</txt></block></note></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6f607cbd-f1a4-48b3-9296-957aca7d051f" id="sec.28-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_2e497d96-d443-4381-ae13-25c3da062814" id="sec.28-ssec.4-def.grant_"><txt break.before="1"><defterm guid="_6c3c37f3-9a6c-4d4e-9cd6-c97fb369616a" id="sec.28-ssec.4-def.grant" type="definition">grant</defterm>, of a right, includes an authority, lease, licence, permit or other instrument of tenure, however called.</txt></definition></deflist></block></subclause></clause></part></chapter><chapter affected.by.uncommenced="0" guid="_60f42d8e-8fdb-4c76-a1e6-d0c7ad27b9d4" id="ch.2"><no>Chapter 2</no><heading guid="_b44ae2bd-6997-4cdb-8aee-17589eeb232e" id="ch.2-he">GHG exploration permits</heading><note guid="_08577d3e-4cab-4c12-b920-29ca2ea592f8" id="ch.2-note" type="example"><heading guid="_7c140d14-c19c-4a26-99eb-b9c17fa1f5dc" id="ch.2-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_9e9ab581-6b2e-42df-89b9-96fd0db5e235" id="ch.2-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">For the requirement to have a GHG tenure, see <intref check="valid" refid="sec.386" target.guid="_47dc29d5-fcf5-4fca-81ba-0ab5605dca08">section 386</intref>.</txt></block></li><li guid="_8bdd17af-b81f-4c49-8b7b-7a12657abbd7" id="ch.2-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0"><intref check="valid" refid="ch.4" target.guid="_faefc638-342e-43b0-a5ed-6ae7a9f9a690">Chapter 4</intref> imposes requirements for and restrictions on the granting of, and restrictions on authorised activities that may be carried out under, particular GHG tenures. See <intref check="valid" refid="sec.182" target.guid="_c7817b2c-1608-4582-b68b-f5e5344a3b0f">section 182</intref>.</txt></block></li></list></block></note><part affected.by.uncommenced="0" guid="_268c7353-63e2-4481-af6a-c5e5ac457b76" id="ch.2-pt.1"><no>Part 1</no><heading guid="_eaf1c1e5-fc06-4e16-a7fd-076e914133a2" id="ch.2-pt.1-he">Key authorised activities</heading><clause affected.by.uncommenced="0" guid="_8a26a8b7-70a7-4780-9b28-9afa5b1aefe1" id="sec.29" provision.type="other" spent.amends="0"><no>29</no><heading guid="_0ed97942-e302-456f-969b-572b9719231c" id="sec.29-he">Operation of <intref check="valid" refid="ch.2-pt.1" target.guid="_268c7353-63e2-4481-af6a-c5e5ac457b76">pt 1</intref></heading><block><txt break.before="1">This part provides for the key authorised activities for a GHG permit.</txt><note guid="_1b30e10e-1fbe-409d-90fe-6c327a5511aa" id="sec.29-note" type="example"><heading guid="_fea0912f-7599-4c1f-8f6c-a25c0c270eb3" id="sec.29-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_e593ec00-4c3a-4524-8023-33cdbeb5e9ee" id="sec.29-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">For other authorised activities, see the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-2014-047" target.guid="_78e7ee55-dcff-4087-b0b9-13497e839af3" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">chapter 3</legref>, <legref check="valid" jurisd="QLD" refid="ch.3-pt.2" target.doc.id="act-2014-047" target.guid="_adcc85c6-c389-49c8-b998-858dca31ac1f" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">part 2</legref>, <legref check="valid" jurisd="QLD" refid="ch.3-pt.2-div.4" target.doc.id="act-2014-047" target.guid="_e1353372-233b-4244-80ae-a5473476fdc0" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">division 4</legref> (Access to private land outside authorised area) and <intref check="valid" refid="ch.5-pt.12" target.guid="_1522b152-04be-4326-95f6-52b27402695b">part 12</intref> (General provisions for conditions and authorised activities).</txt></block></li><li guid="_54f9be52-f4a3-4445-a032-5461681ae843" id="sec.29-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">For general restrictions on authorised activities, their relationship with owners’ and occupiers’ rights and who may carry out authorised activities for a GHG authority holder, see <intref check="valid" refid="ch.5" target.guid="_c200371d-7276-455f-ab31-e74d811368e1">chapter 5</intref>, <intref check="valid" refid="ch.5-pt.12" target.guid="_1522b152-04be-4326-95f6-52b27402695b">part 12</intref>, <intref check="valid" refid="ch.5-pt.12-div.3" target.guid="_52e9113b-f38f-4392-a865-e39e2e512683">division 3</intref>.</txt></block></li><li guid="_5da6b9ee-639c-4d3a-a86b-c14a347f3da9" id="sec.29-note-para1.3" provision.type="other"><no>3</no><block><txt break.before="0">The carrying out of particular activities on particular land in a GHG permit’s area may not be authorised following the taking of the land under a resumption law. See <intref check="valid" refid="sec.369B" target.guid="_d9b1575e-7c2a-404c-9b3e-19f30c1ce1e6">section 369B</intref>.</txt></block></li></list></block></note></block></clause><clause affected.by.uncommenced="0" guid="_1b4a9bc9-f9d3-4280-8654-e57c4befe4df" id="sec.30" provision.type="other" spent.amends="0"><no>30</no><heading guid="_d868e66f-8b0b-4d68-aa59-b51031bfdf78" id="sec.30-he">Principal authorised activities</heading><block><txt break.before="1">The GHG permit holder may carry out the following activities in the permit’s area—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ae520bef-e3a6-434f-975d-8861ae1d07c4" id="sec.30-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">GHG storage exploration;</txt></block></li><li guid="_a1ca1add-f467-434f-aacc-1444a80d7479" id="sec.30-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">evaluating the feasibility of GHG stream storage, including for example, by GHG storage injection testing;</txt></block></li><li guid="_18583729-b4fd-4304-9209-ccb9a7a2a714" id="sec.30-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">plugging and abandoning, or otherwise remediating, a bore or well the holder reasonably believes is a legacy borehole, and rehabilitating the surrounding area in compliance with the requirements prescribed under a regulation.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_89f6a548-55bd-4305-9c49-bc4abc700a6b" id="sec.31" provision.type="other" spent.amends="0"><no>31</no><heading guid="_00703b5f-f723-48b5-a3e7-76d1e0c55086" id="sec.31-he">Incidental activities</heading><subclause affected.by.uncommenced="0" guid="_384001eb-50f2-4132-b15d-685512730e1c" id="sec.31-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The GHG permit holder may carry out any other activity (an <defterm guid="_3cfe510d-36e8-4936-a032-9c8c29880e42" id="sec.31-def.incidentalactivity" type="definition">incidental activity</defterm>) in the permit’s area if carrying it out is reasonably necessary for or is incidental to GHG storage exploration.</txt><note guid="_018132c7-794e-410b-9d46-e10c4ae9ce80" id="sec.31-ssec.1-note" type="example"><heading guid="_8fc68fd6-ab4b-4be5-a2ae-76ee737babc6" id="sec.31-ssec.1-note-he">Examples of incidental activities—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_a0768415-6a5e-4906-b627-c893276f94cb" id="sec.31-ssec.1-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">constructing or operating facilities, plant or works, including for example, communication systems, compressors, powerlines, pumping stations, reservoirs, roads, evaporation or storage ponds and tanks</txt></block></li><li guid="_264f4ee7-05f5-4fad-a133-69960d8b4e9f" id="sec.31-ssec.1-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">constructing or using temporary structures or structures of an industrial or technical nature, including for example, mobile and temporary camps</txt></block></li></list></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_c81e58e5-5836-45c6-a225-35d6e48da575" id="sec.31-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, constructing or using a structure other than a temporary structure, for office or residential accommodation is not an incidental activity.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_7f976c7a-8d1f-43eb-b00e-acc633d1e46b" id="ch.2-pt.2"><no>Part 2</no><heading guid="_8398e489-b7d9-4e38-9333-dbda75ffa31b" id="ch.2-pt.2-he">Obtaining GHG permits</heading><division affected.by.uncommenced="0" guid="_d5b00b46-274e-4281-ae56-009ac675811f" id="ch.2-pt.2-div.1"><no>Division 1</no><heading guid="_9b38942b-7ca8-4447-8e26-f6aa6ddafc63" id="ch.2-pt.2-div.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_b7b4f419-f672-45e4-a1db-b8e2ed3aeb0f" id="sec.32" provision.type="other" spent.amends="0"><no>32</no><heading guid="_9e002283-b15c-4987-b47c-c5c6767b530d" id="sec.32-he">Operation of <intref check="valid" refid="ch.2-pt.2" target.guid="_7f976c7a-8d1f-43eb-b00e-acc633d1e46b">pt 2</intref></heading><subclause affected.by.uncommenced="0" guid="_f03184a7-fe05-414c-af0d-9022dcfc1dd4" id="sec.32-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This part provides for a process for the granting of GHG permits by competitive tender.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_dbe2faaa-994e-48f3-987b-3beada8378d3" id="sec.32-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">To remove any doubt, it is declared that a GHG permit can only be granted under this part.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_ef8fcfe2-ed91-447a-bc6f-3d829737f9b8" id="ch.2-pt.2-div.2"><no>Division 2</no><heading guid="_118fef0e-442a-4a3d-9410-0d57266159ae" id="ch.2-pt.2-div.2-he">Competitive tenders</heading><clause affected.by.uncommenced="0" guid="_f0ad3da8-2ce3-40a0-b87b-acd049d31664" id="sec.33" provision.type="other" spent.amends="0"><no>33</no><heading guid="_f16906e4-7f62-4d2c-a2dc-ea63a07ff838" id="sec.33-he">Call for tenders</heading><subclause affected.by.uncommenced="0" guid="_5aa8701b-3fc8-47b5-9d28-9dfddbadf646" id="sec.33-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may by gazette notice invite tenders for a GHG permit (a <defterm guid="_1b044ff6-9bc9-4ef2-81a3-fb3db72538f5" id="sec.33-def.callfortenders" type="definition">call for tenders</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7d636d93-6fe1-4eb6-8137-69b5204d12c1" id="sec.33-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The call must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_53e321c5-beb0-4a23-8ef3-2636357577ac" id="sec.33-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the day and time by which tenders in response to it must be made (the <defterm guid="_e8cec858-fb17-4dea-b657-c30745fcd993" id="sec.33-ssec.2-def.closingtime" type="definition">closing time</defterm> for the call); and</txt></block></li><li guid="_da7459d7-8ebf-412f-836c-51ad9aac9e37" id="sec.33-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any criteria (<defterm guid="_91248291-1f23-40a5-aa1a-5b251dcd19ce" id="sec.33-ssec.2-def.specialcriteria" type="definition">special criteria</defterm>) other than the work program criteria and capability criteria proposed to be used to decide whether to grant the GHG permit or to decide its provisions.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8c75f8b1-8aaf-4d3d-8776-e0477cc66664" id="sec.33-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The call may state other relevant matters, including for example, matters relevant to the work program criteria and capability criteria.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f81d12ed-1202-4714-832e-6f5535fc05cc" id="sec.34" provision.type="other" spent.amends="0"><no>34</no><heading guid="_37e51029-42c7-409a-90c0-4811ed4ce57b" id="sec.34-he">Right to tender</heading><subclause affected.by.uncommenced="0" guid="_65487bf9-72c4-498d-a235-28a9c992caae" id="sec.34-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An eligible person may by a tender made under <intref check="valid" refid="sec.35" target.guid="_63d13d4b-bd9d-47a4-ac18-9898e2cb0383">section 35</intref>, tender for a proposed GHG permit the subject of a call for tenders.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_60820b9e-c3dc-4da4-929b-9167d3efd407" id="sec.34-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, a tender can not be made—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f0813c35-3eb1-4225-94d3-06424cef8460" id="sec.34-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">after the closing time for the call; or</txt></block></li><li guid="_867de418-7c73-440b-9a86-5418190184b6" id="sec.34-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for only part of the proposed GHG permit’s area.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_63d13d4b-bd9d-47a4-ac18-9898e2cb0383" id="sec.35" provision.type="other" spent.amends="0"><no>35</no><heading guid="_d1180c0e-bc54-4e35-b1e9-2f2c392f1c7e" id="sec.35-he">Requirements for making tender</heading><block><txt break.before="1">A tender for a GHG permit must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_32be4061-e777-4eaa-818e-699052fb7168" id="sec.35-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be made to the Minister in the approved form; and</txt></block></li><li guid="_ae4072cf-72d4-46d3-bd0e-7df58a112df2" id="sec.35-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_617e4b86-9bfb-4a29-8443-3e00ea0e4595" id="sec.35-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a statement about how and when the tenderer proposes to consult with and keep informed each owner and occupier of private or public land on which authorised activities for the proposed GHG permit are or are likely to be carried out; and</txt></block></li><li guid="_70e72e28-4c50-4154-b453-d018cbe56afe" id="sec.35-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a proposed work program that complies with the initial work program requirements; and</txt></block></li><li guid="_0fabe27e-f57e-4cfe-b1b6-2c4add1187bf" id="sec.35-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">a statement about the extent to which the tenderer has—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a9013508-f6dc-43ef-a12b-edbccd3f3df9" id="sec.35-para1.b-para2.iii-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">the financial and technical resources to carry out authorised activities for the proposed GHG permit; and</txt></block></li><li guid="_f622e99e-ec3d-4adb-b2dc-33a15aca6d21" id="sec.35-para1.b-para2.iii-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">the ability to manage GHG storage exploration; and</txt></block></li></list></block></li></list></block></li><li guid="_2bf663b9-6ce0-479e-8a34-a9404f3c110f" id="sec.35-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">state that the applicant agrees to, as soon as practicable after the grant of the GHG permit to the applicant, give each of the owners or occupiers a notice—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fa384d05-71df-44cf-931d-acbc481788eb" id="sec.35-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">describing the activities proposed to be carried out on the land; and</txt></block></li><li guid="_222f4712-6f2b-49db-875a-b273bbc02aff" id="sec.35-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">stating where and when the activities will be carried out; and</txt></block></li></list></block></li><li guid="_2cafc013-244d-4291-a4ea-e7044c43546d" id="sec.35-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">be accompanied by the fee prescribed under a regulation.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" change="ins" guid="_216c3e87-4ca3-4dce-a87f-46fb4a12d44c" id="sec.35A" provision.type="other" spent.amends="0"><no>35A </no><heading guid="_431f5d33-7d01-47ab-889f-ed2390fe6267" id="sec.35A-he">Rejection of tender if tenderer disqualified</heading><subclause affected.by.uncommenced="0" guid="_6954c5f1-8eec-47fa-91f5-6ac69aeb36bf" id="sec.35A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister must reject a tender for a GHG permit if the Minister decides the tenderer is disqualified under the Common Provisions Act, chapter 7 from being granted the GHG permit.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0cd45a00-0b82-46b5-a354-e3c5179fe8bd" id="sec.35A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On rejection of the tender, the Minister must give the tenderer a notice about the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_518880fa-0237-4296-baff-4e508c8e93d7" id="sec.37" provision.type="other" spent.amends="0"><no>37</no><heading guid="_29fe8b3c-aa70-4b98-b401-5af6f8a75aa2" id="sec.37-he">Right to terminate call for tenders</heading><subclause affected.by.uncommenced="0" guid="_c3457d8a-9434-4269-a4b3-67c616e2ff07" id="sec.37-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may by gazette notice terminate a call for tenders at any time before deciding whether to grant a GHG permit to a person who has made a tender in response to the call.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f6394b27-b737-44ce-b051-9bbf56c3092b" id="sec.37-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">All tenders in response to the call lapse when the call is terminated.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ee486686-61de-4cca-9e4c-a323d6ef2f91" id="sec.37-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">No amount, whether by way of compensation, reimbursement or otherwise, is payable by the State to any person for or in connection with the termination.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_24a42a64-b1df-412a-9b17-2d3bf2fe487f" id="ch.2-pt.2-div.3"><no>Division 3</no><heading guid="_3dff4870-9750-4673-8f4f-18a9c2fb9b4e" id="ch.2-pt.2-div.3-he">Deciding tenders</heading><clause affected.by.uncommenced="0" guid="_f1fcc045-44ca-40c6-a249-d4ff43dac492" id="sec.38" provision.type="other" spent.amends="0"><no>38</no><heading guid="_6cd80fd7-79d5-41ff-9afb-6927e039c731" id="sec.38-he">Process for deciding tenders</heading><block><txt break.before="1">Subject to <intref check="valid" refid="sec.42" target.guid="_c1ff0b2d-2444-49b4-929f-0ed640ee415a">section 42</intref>, any process the Minister considers appropriate may be used to decide a call for tenders, including for example, by a process appointing a preferred tenderer on the tenders made in response to the call.</txt></block></clause><clause affected.by.uncommenced="0" guid="_8941e253-f01a-4e00-9168-e865fe85d388" id="sec.39" provision.type="other" spent.amends="0"><no>39</no><heading guid="_8e17041f-7982-4d56-8c58-10ea5bde3f57" id="sec.39-he">Provisions for preferred tenderers</heading><subclause affected.by.uncommenced="0" guid="_d69d38b0-ab46-4632-a9b4-563fc05e09c9" id="sec.39-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may require a preferred tenderer for the call for tenders to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ef011aeb-16b6-4129-9f89-07aa11a423d4" id="sec.39-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">pay any amounts necessarily incurred or to be incurred to enable the GHG permit to be granted; and</txt></block></li><li guid="_ba9f505f-0538-4d4a-b3ae-6db4459f3874" id="sec.39-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to do all or any of the following within a stated reasonable period—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1321884e-f842-4d3b-a882-8053f81874d1" id="sec.39-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">pay the annual rent for the first year of the GHG permit;</txt></block></li><li guid="_a2249c4d-9dc2-4df0-8e66-401c5b0261cb" id="sec.39-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">give under <intref check="valid" refid="sec.271" target.guid="_189844e5-1f2b-472b-a0aa-286d65029d9a">section 271</intref>, security for the GHG permit.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7beca438-2cb3-4b87-9191-a34563681458" id="sec.39-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If a preferred tenderer does not—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8ef759aa-366c-4996-9bd6-84bca56fad83" id="sec.39-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">comply with a requirement under <intref check="valid" refid="sec.39-ssec.1" target.guid="_d69d38b0-ab46-4632-a9b4-563fc05e09c9">subsection (1)</intref>; or</txt></block></li><li guid="_dbc8c1ac-f183-4e4e-ad5a-b3a13f3a5008" id="sec.39-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">do all things reasonably necessary to allow a GHG permit to be granted to the tenderer;</txt></block></li></list></block><block><txt break.before="1">the Minister may appoint another tenderer to be the preferred tenderer.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_289f7458-d97e-4fae-b566-d733e8a7235e" id="sec.40" provision.type="other" spent.amends="0"><no>40</no><heading guid="_b64c3e57-0925-46fe-a92d-688d1e8641fb" id="sec.40-he">Deciding whether to grant GHG permit</heading><subclause affected.by.uncommenced="0" guid="_3559dc4d-1147-48f9-b048-bc03e40829e3" id="sec.40-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may, after the closing time for the call for tenders—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5624947d-6899-4ac1-9dd1-3af98f2d723d" id="sec.40-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">grant a GHG permit to 1 tenderer; or</txt></block></li><li guid="_2c315907-9a78-4d04-8698-488cc89fa03f" id="sec.40-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">refuse to grant any GHG permit.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_aadd6ff8-0c88-453a-9699-907c6cd35287" id="sec.40-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bb384c4a-ccef-4056-9d68-9daced5af01a" id="sec.40-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before deciding to grant the GHG permit, the Minister must decide whether to approve the applicant’s proposed initial work program for the permit; and</txt></block></li><li guid="_2089e4fb-d040-4b30-b541-e9c9cfa92e2f" id="sec.40-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Minister can not grant the GHG permit unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_81ee965e-e524-4673-a8f8-6fe67c1d3439" id="sec.40-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the tenderer is an eligible person; and</txt></block></li><li guid="_a897497b-064b-4b9b-a93b-db85c7a73e72" id="sec.40-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the proposed program has been approved; and</txt></block></li><li guid="_de1110a8-dc61-4df0-8989-b670f3b46e1d" id="sec.40-ssec.2-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">a relevant environmental authority has been issued.</txt></block></li></list></block></li></list><note guid="_cc07e10e-c99e-4ecc-adf6-85795b8fe582" id="sec.40-ssec.2-note" type="example"><heading guid="_70a06f26-5e36-4496-acc3-29bc944bf5ec" id="sec.40-ssec.2-note-he">Note—</heading><block><txt break.before="1">If a tender relates to acquired land, see also <intref check="valid" refid="sec.369C" target.guid="_5d318eda-c04e-41c4-927c-5bfccbc8d0f8">section 369C</intref>.</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_34765540-0a08-4786-9832-e30b382f5132" id="sec.41" provision.type="other" spent.amends="0"><no>41</no><heading guid="_8f17aab6-2f47-4963-8816-6fef449a6366" id="sec.41-he">Provisions of GHG permit</heading><subclause affected.by.uncommenced="0" guid="_07a31964-130e-4f35-9899-aa233a25e5cc" id="sec.41-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Each GHG permit must state its term and area.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bc7592d5-0a32-4712-b1ec-1e5a657bec15" id="sec.41-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The term—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_51d89938-8345-405e-8352-8cebb8a3b2de" id="sec.41-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must be for at least the required program period for the initial work program for the GHG permit under the call for tenders; but</txt></block></li><li guid="_d06bf65b-2649-442c-9216-f5aa806cbe0b" id="sec.41-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">must end no later than 12 years after the GHG permit takes effect.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c24302cf-a74c-4f6f-ba03-03f15a226d06" id="sec.41-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The GHG permit may also state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ccb4b0b6-6143-4d24-a6f1-cbd88bf1d65a" id="sec.41-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">conditions or other provisions of the GHG permit other than conditions or provisions that are—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_98911b1a-4f0b-47f0-8898-8c8ecfc6d5dd" id="sec.41-ssec.3-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">inconsistent with the mandatory conditions for GHG permits; or</txt></block></li><li guid="_1740c7fa-1bb3-479e-8297-8c09575ee623" id="sec.41-ssec.3-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the same as or substantially the same as or inconsistent with any relevant environmental condition; and</txt></block></li></list></block></li><li guid="_bf09a77f-0270-4d88-bc57-043a3a0111da" id="sec.41-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the day it takes effect; and</txt></block></li><li guid="_a1493e66-c0ef-4df8-9c16-cf4999a82bf5" id="sec.41-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">GHG permit’s relinquishment days.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8de1f05c-3663-45b1-8591-bed14c32872f" id="sec.41-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, the provisions of the GHG permit may exclude or restrict the carrying out of an authorised activity for the permit.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_11ba9b3b-8100-4aaa-bfac-d8f39f0796b0" id="sec.41-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The day of effect must not be before the day the GHG permit is granted.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_13976798-359a-4b67-be92-e6397fc94b93" id="sec.41-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">If no day of effect is stated, the GHG permit takes effect on the day it is granted.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b71d3b51-07e7-4d2e-ae08-02818e4d9204" id="sec.41-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">The first relinquishment day must not be later than 4 years after the day the GHG permit is to take effect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9f8fd345-631c-4f50-9c46-337b343b6a4b" id="sec.41-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">The second and any later relinquishment days must not be later than 4 years after the previous relinquishment day.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a0a944c8-9114-49d2-8beb-cce79f7e1e0a" id="sec.41-ssec.9" provision.type="other"><no>(9)</no><block><txt break.before="0">If relinquishment days are not stated, they are taken to be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_af7196c2-bccd-4fc3-83e3-ae939f2626ed" id="sec.41-ssec.9-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the day that is the fourth anniversary of the GHG permit’s day of effect; and</txt></block></li><li guid="_0eb939ca-5f99-4b5c-8668-7017c4e7b1a1" id="sec.41-ssec.9-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">each day during its term that is the end of a 4 yearly interval after the day of effect.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c1ff0b2d-2444-49b4-929f-0ed640ee415a" id="sec.42" provision.type="other" spent.amends="0"><no>42</no><heading guid="_0d9e2b3a-a6ab-4219-bdc8-def603fd0028" id="sec.42-he">Criteria for decisions</heading><subclause affected.by.uncommenced="0" guid="_38f20a73-2ba0-4d43-90f4-4a4ac4c951c6" id="sec.42-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">In deciding whether to grant a GHG permit or deciding its provisions the Minister must consider—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_70f9fdd2-c98e-423e-8e05-9c296ab174bd" id="sec.42-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">any special criteria; and</txt></block></li><li guid="_37aca369-fbed-407b-8cf1-6ef29852e3c2" id="sec.42-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the applicant’s proposed initial work program; and</txt></block></li><li guid="_e4888153-56ca-438d-9585-4bec63d8937e" id="sec.42-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the extent to which the Minister is of the opinion that the tenderer is capable of carrying out authorised activities for the GHG permit, having regard to the tenderer’s—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_234f6b56-87fa-4fb6-82ce-080abfb51e23" id="sec.42-ssec.1-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">financial and technical resources; and</txt></block></li><li guid="_3a1f3930-139a-4e24-9895-3e7e10da8a80" id="sec.42-ssec.1-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">ability to manage GHG storage exploration.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2f6108f1-7dda-4804-bdd2-55a47f6395c8" id="sec.42-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The matters mentioned in <intref check="valid" refid="sec.42-ssec.1" target.guid="_38f20a73-2ba0-4d43-90f4-4a4ac4c951c6">subsection (1)</intref><intref check="valid" refid="sec.42-ssec.1-para1.c" target.guid="_e4888153-56ca-438d-9585-4bec63d8937e">(c)</intref> are the <defterm guid="_2040250e-7ecc-4354-94cd-7f3defe8d548" id="sec.42-def.capabilitycriteria" type="definition">capability criteria</defterm>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_36211ce0-25ee-4fc8-918f-6d523fa24a82" id="sec.42-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A person <defterm guid="_a4f0e2ea-c1a7-4051-beed-496994501b43" id="sec.42-def.satisfies" type="definition">satisfies</defterm> the capability criteria if the Minister forms the opinion mentioned in <intref check="valid" refid="sec.42-ssec.1" target.guid="_38f20a73-2ba0-4d43-90f4-4a4ac4c951c6">subsection (1)</intref><intref check="valid" refid="sec.42-ssec.1-para1.c" target.guid="_e4888153-56ca-438d-9585-4bec63d8937e">(c)</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b8e38cec-6c83-4811-be3c-89527bb6b15d" id="sec.43" provision.type="other" spent.amends="0"><no>43</no><heading guid="_4fa06f83-a58e-4238-abb2-d373abd7398d" id="sec.43-he">Notice to unsuccessful tenderers</heading><block><txt break.before="1">After a call for tenders has been decided, the Minister must give each tenderer not granted the GHG permit notice of the decision.</txt></block></clause></division></part><part affected.by.uncommenced="0" guid="_7e7da09a-1f16-4654-b963-74e69032fe46" id="ch.2-pt.3"><no>Part 3</no><heading guid="_3bd939f5-a50f-4ad8-84af-ecafa018e3a9" id="ch.2-pt.3-he">Area provisions</heading><clause affected.by.uncommenced="0" guid="_bc0debf2-95b9-432d-bf68-8c80bb7e0084" id="sec.44" provision.type="other" spent.amends="0"><no>44</no><heading guid="_0aa7ba08-b56e-40c3-bd2e-9b01ff947fda" id="sec.44-he">Area of GHG permit</heading><subclause affected.by.uncommenced="0" guid="_ea01a202-a4a4-4c09-921f-8be168d1ca7a" id="sec.44-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section provides for the area of a GHG permit.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_12fcb495-ae3e-4567-84f0-ed19f5b88dbf" id="sec.44-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The area does not include excluded land for the GHG permit.</txt><note guid="_00408eb7-9366-4777-9417-23134561d571" id="sec.44-ssec.2-note" type="example"><heading guid="_7dc46d73-ff59-49b8-b3a5-c8488621fca7" id="sec.44-ssec.2-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.369B" target.guid="_d9b1575e-7c2a-404c-9b3e-19f30c1ce1e6">section 369B</intref><intref check="valid" refid="sec.369B-ssec.3" target.guid="_777242e4-b077-4ab7-9353-815d601f3782">(3)</intref> if land in the GHG permit’s area is taken under a resumption law.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_8dd3e518-01a5-447a-806f-c41ebe59bb7d" id="sec.44-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Unless the Minister otherwise decides, the area must form a single parcel of land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c7297fd8-e6c8-452e-abc4-6b244782b68f" id="sec.44-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The area must not include any of the following (<defterm guid="_9b1c3f89-81a1-4e4f-832f-c3fc191df04a" id="sec.44-def.unavailableland" type="definition">unavailable land</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a1681e59-9565-4d3b-8c1b-c522477f8645" id="sec.44-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">land in the area of another GHG tenure;</txt></block></li><li guid="_4ea17a81-c633-4cbd-a280-bf203f839e8b" id="sec.44-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">excluded land for a GHG tenure;</txt></block></li><li guid="_bcd8b493-ec6c-43a4-b601-27b6e558ce1b" id="sec.44-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">land that a regulation prescribes as land over which a GHG permit can not be granted.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_39d487aa-264d-4298-9872-3fa9cf63a255" id="sec.44-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The area may include a part of a block only if the part is all areas within the block that are left after taking away all unavailable land within the block (a <defterm guid="_1c481c83-117e-49e3-b9c5-3ba6afce19f8" id="sec.44-def.residualblock" type="definition">residual block</defterm>).</txt><note guid="_2d6c2ddf-b92d-4d2d-b5f2-f3940c801913" id="sec.44-ssec.5-note" type="example"><heading guid="_bef8a041-5868-4675-b2c4-e6b751293f54" id="sec.44-ssec.5-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.369B" target.guid="_d9b1575e-7c2a-404c-9b3e-19f30c1ce1e6">section 369B</intref><intref check="valid" refid="sec.369B-ssec.3" target.guid="_777242e4-b077-4ab7-9353-815d601f3782">(3)</intref> if land in the GHG permit’s area is taken under a resumption law.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_e0e0f9c7-1c7a-45b0-bf2b-c14e569dc920" id="sec.44-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The area must be no more than 100 blocks or residual blocks, in any combination.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_6b5a59a2-2b2c-4699-a40b-388c01347b87" id="sec.45" provision.type="other" spent.amends="0"><no>45</no><heading guid="_bc82d9ca-edef-42e3-81aa-5ea9810f1060" id="sec.45-he">References to sub-blocks of GHG permit</heading><subclause affected.by.uncommenced="0" guid="_48ae11c1-da8c-4e1b-8b83-cde1c153e053" id="sec.45-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a GHG permit states that its area includes land within a block without including or excluding any particular sub-block.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0c897d94-9bd8-48e5-96df-246cc25dcdb9" id="sec.45-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The reference to the block is a reference to all sub-blocks within the block to the extent they do not consist of unavailable land.</txt><note guid="_5139fb19-552f-416f-9e8d-d9cd6cfaf430" id="sec.45-ssec.2-note" type="example"><heading guid="_bfa49484-55d3-4936-8306-f59c94a26c18" id="sec.45-ssec.2-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.369B" target.guid="_d9b1575e-7c2a-404c-9b3e-19f30c1ce1e6">section 369B</intref><intref check="valid" refid="sec.369B-ssec.3" target.guid="_777242e4-b077-4ab7-9353-815d601f3782">(3)</intref> if land in the GHG permit’s area is taken under a resumption law.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_b9fa52a9-d70a-43bb-8f2a-18951c2bac91" id="sec.45-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">To remove any doubt, it is declared that if land within any of the sub-blocks ceases to be unavailable land, the cessation itself does not cause the land to be within the permit’s area.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0312feeb-44ba-4d12-a828-50d74eb5643a" id="sec.46" provision.type="other" spent.amends="0"><no>46</no><heading guid="_7b580ef4-5de4-45b9-bc08-a40aad7d3a8d" id="sec.46-he">Minister’s power to decide excluded land</heading><subclause affected.by.uncommenced="0" guid="_b1154030-e689-45ff-83f8-c77c3d74397f" id="sec.46-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may decide excluded land for a GHG permit or proposed GHG permit.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_35a4e533-408b-4d9a-94d9-86b89ac5d8af" id="sec.46-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the power under <intref check="valid" refid="sec.46-ssec.1" target.guid="_b1154030-e689-45ff-83f8-c77c3d74397f">subsection (1)</intref> may be exercised only when the Minister is deciding whether to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1dad4ca5-ce99-4ac1-93a3-1f693a248243" id="sec.46-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">grant or renew the GHG permit; or</txt></block></li><li guid="_4aa10397-d365-43fb-b032-111afa27e10e" id="sec.46-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">approve any later work program for the GHG permit.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_88e43ded-0afd-44a4-97a1-e5a287efc775" id="sec.46-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, excluded land can not be a whole block.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9e8a333b-78fd-4591-9cf5-9d06ca34c876" id="sec.46-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Excluded land may be described in a way the Minister considers appropriate, including for example, by area or by reference to a stated type of land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_91bfcf39-962d-43ed-be99-2d121bec8798" id="sec.46-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Land ceases to be excluded land for a GHG permit if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_77033aa3-4a4d-45b6-8fd8-3cec00b1e915" id="sec.46-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the block in which the land is located is relinquished or for any other reason ceases to be in the permit’s area; or</txt></block></li><li guid="_29ba7a15-a9fd-46ec-98ac-0d35efe57054" id="sec.46-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a GHG lease is granted over any of the GHG permit’s area and the land is excluded land for the lease.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_43a28c5a-9e0c-4853-a720-4eb5bb964223" id="sec.47" provision.type="other" spent.amends="0"><no>47</no><heading guid="_798e40e7-48d9-4292-81fa-2febbe5f30b2" id="sec.47-he">Minister may add excluded land</heading><subclause affected.by.uncommenced="0" guid="_afb188f0-4963-426e-bde7-6ddf1fc49d78" id="sec.47-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may amend a GHG permit by adding excluded land for the GHG permit to its area only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_072afee7-60f4-42f5-a381-ed498a2f5512" id="sec.47-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the GHG permit as amended complies with <intref check="valid" refid="sec.44" target.guid="_bc0debf2-95b9-432d-bf68-8c80bb7e0084">section 44</intref>; and</txt></block></li><li guid="_db999937-a16e-4d50-b190-d8a1da8f1817" id="sec.47-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the GHG permit holder consents.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a76efb50-904a-4cc7-b67d-83ea45c3f717" id="sec.47-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If land mentioned in <intref check="valid" refid="sec.47-ssec.1" target.guid="_afb188f0-4963-426e-bde7-6ddf1fc49d78">subsection (1)</intref> is added to the GHG permit’s area the land ceases to be excluded land for the permit.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a3894556-57e2-4d04-a066-cdf8135a5902" id="sec.47-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister may amend the provisions of the GHG permit in a way that reflects the inclusion of the excluded land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a232616c-1459-41e7-b865-d22d0672907a" id="sec.47-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Also, the Minister may give the GHG permit holder a notice—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b899ea76-8cd3-4624-b23a-749098a9b6eb" id="sec.47-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">withdrawing from a stated day, the approval of the work program for the GHG permit; and</txt></block></li><li guid="_02bbb10f-0e98-4ca0-8f2c-4ec8d18d5d5a" id="sec.47-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">directing the holder to give the Minister a proposed later work program for the GHG permit that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1ed0434e-4c5f-4b64-b14b-80bcc5b4ce9a" id="sec.47-ssec.4-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">complies with the later work program requirements; and</txt></block></li><li guid="_6d624cf8-b57a-4a9e-9d8a-02814cf0383f" id="sec.47-ssec.4-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">changes the work program for the GHG permit to reflect the inclusion of the excluded land.</txt></block></li></list></block></li></list><note guid="_eb25e6f4-4cab-4d9f-abc0-0dac6a922087" id="sec.47-ssec.4-note" type="example"><heading guid="_84e85402-e067-4756-9f35-0fc52e412f3d" id="sec.47-ssec.4-note-he">Note—</heading><block><txt break.before="1">For other relevant provisions about giving a document to the Minister, see <intref check="valid" refid="sec.411" target.guid="_1563d9ac-bd31-449e-842a-931b0e660c2b">section 411</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_cfa6160b-50eb-4d09-9ffc-ebaffc1b6226" id="sec.47-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The amended provisions of the GHG permit or the proposed later work program must not be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fbf14161-4e21-4c5d-aa99-74ab186d23af" id="sec.47-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">inconsistent with the mandatory conditions for GHG permits; or</txt></block></li><li guid="_4139f9a0-baaf-4e7b-bf02-9dd3de77853c" id="sec.47-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the same as or substantially the same as or inconsistent with any relevant environmental condition.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_5ddb6410-88fa-4e9c-909a-1535eab66cf5" id="sec.48" provision.type="other" spent.amends="0"><no>48</no><heading guid="_563470f4-0065-43b9-9cbd-bfaeb3028728" id="sec.48-he">Area of GHG permit reduced on grant of GHG lease</heading><subclause affected.by.uncommenced="0" guid="_78384f5c-c8e0-4744-ab61-e4802a0fe3eb" id="sec.48-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Land ceases to be included in the area of a GHG permit if a GHG lease is granted to the permit holder over the land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_60579537-9a63-42ed-8041-8b452e9dd5a4" id="sec.48-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If a GHG lease is granted to the GHG permit holder over all of the area of a GHG permit, the permit ends.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_027068ea-17b1-4378-a9ef-526f76ae1044" id="sec.49" provision.type="other" spent.amends="0"><no>49</no><heading guid="_88d71a13-2d0d-4266-baee-5371c6daf478" id="sec.49-he">Effect of ending of declaration of potential storage area</heading><subclause affected.by.uncommenced="0" guid="_b6b57c3b-4838-4181-b9f7-97a1faed2ee1" id="sec.49-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8053546c-7f44-4d2f-9106-d685c7338d43" id="sec.49-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">all or part of the area of a GHG permit is a potential storage area; and</txt></block></li><li guid="_28549991-d87f-4450-b9e3-f03d33f2a9c1" id="sec.49-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the declaration of the potential storage area ends more than 12 years after the GHG permit originally took effect.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_06a65d7c-cb0b-4ca1-ae77-b9a02ef09d3c" id="sec.49-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the declaration applied to a part of the GHG permit’s area, the part ceases to be included in the area.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5f1810cc-052d-4d29-bb29-2af26ea7ed22" id="sec.49-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the declaration applies to all of the GHG permit’s area, the permit ends.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_53fb6f4f-0594-47f9-8ba9-bcbacb27f25f" id="ch.2-pt.4"><no>Part 4</no><heading guid="_3bc0a10f-cfb1-43fb-b519-a4c85094ad5e" id="ch.2-pt.4-he">Work programs</heading><division affected.by.uncommenced="0" guid="_d09e390d-597e-43dd-9984-3a4d009acca5" id="ch.2-pt.4-div.1"><no>Division 1</no><heading guid="_acdf6302-e1eb-4e0a-bd6a-9cf500e30031" id="ch.2-pt.4-div.1-he">Function and purpose</heading><clause affected.by.uncommenced="0" guid="_06ccff3b-ab1a-4e82-9e56-007e88e1116c" id="sec.50" provision.type="other" spent.amends="0"><no>50</no><heading guid="_103e02e9-049d-486d-a8fa-d641cee73184" id="sec.50-he">Function and purpose</heading><subclause affected.by.uncommenced="0" guid="_ca8e40ee-5d11-42c7-872f-2e067f092d19" id="sec.50-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The work program for a GHG permit gives detailed information about the nature and extent of activities to be carried out under the permit.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_97a0fada-f9d2-4983-b37b-ec2d5959ae13" id="sec.50-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The purposes of giving the information are to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ef51a8e8-9135-4d41-91b1-8318a0cbadfb" id="sec.50-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">allow resource management decisions to be made; and</txt></block></li><li guid="_359f87c9-6f72-4dbf-a201-0d9cded92b24" id="sec.50-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">ensure appropriate development of the GHG permit.</txt></block></li></list></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_8a997477-b82a-4d00-b9b7-5e6d070c23cc" id="ch.2-pt.4-div.2"><no>Division 2</no><heading guid="_68178705-bd12-467a-a758-aecd7ee0de47" id="ch.2-pt.4-div.2-he">Requirements for proposed initial work programs</heading><clause affected.by.uncommenced="0" guid="_5a0f8d28-e9a3-4238-933b-a01647dfc1eb" id="sec.51" provision.type="other" spent.amends="0"><no>51</no><heading guid="_72677ac4-257f-4593-a8b4-42e79ac0b59d" id="sec.51-he">Operation of <intref check="valid" refid="ch.2-pt.4-div.2" target.guid="_8a997477-b82a-4d00-b9b7-5e6d070c23cc">div 2</intref></heading><block><txt break.before="1">This division provides for requirements (the <defterm guid="_1a0f1ea6-4122-47ba-a267-7f38b1bf98d1" id="def.initialworkprogramrequirements" type="definition">initial work program requirements</defterm>) for a proposed work program for a proposed GHG permit.</txt></block></clause><clause affected.by.uncommenced="0" guid="_91d0cda4-6f66-48a1-80f2-97fab70cdf5c" id="sec.52" provision.type="other" spent.amends="0"><no>52</no><heading guid="_9da5cf1c-6197-4231-a9c8-35488a007e50" id="sec.52-he">Program period</heading><subclause affected.by.uncommenced="0" guid="_f1ee266d-4018-48a6-884f-f7f567298368" id="sec.52-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The proposed program must state its period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_07c7956e-1782-4051-acb2-8dbdce73df08" id="sec.52-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The period must be the same as the required period under the relevant call for tenders.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d3c01389-08de-47a3-8b25-5bb0cc0e5e73" id="sec.53" provision.type="other" spent.amends="0"><no>53</no><heading guid="_f38e95db-bd58-4120-b77f-52285c6455c3" id="sec.53-he">General requirements</heading><subclause affected.by.uncommenced="0" guid="_3951bc0d-293f-4dfc-bd7c-407c72e598d7" id="sec.53-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The proposed program must provide for all of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bd790c09-bdb4-4a86-8e58-4eef184c6e44" id="sec.53-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an overview of the activities proposed to be carried out under the proposed GHG permit during all of its term;</txt></block></li><li guid="_749d0cbc-810b-4f40-af4b-965f8c2d78a6" id="sec.53-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for each year of the program period—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b53a1903-79eb-4bc4-9367-9e86369dee91" id="sec.53-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the extent and nature of GHG storage exploration proposed to be carried out during the year; and</txt></block></li><li guid="_397de984-a414-4df0-b5ef-480e386ed48b" id="sec.53-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">generally where the activities are proposed to be carried out; and</txt></block></li><li guid="_30429543-05b8-44d5-a2c6-1a1a9e5dec3d" id="sec.53-ssec.1-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the estimated cost of the activities;</txt></block></li></list></block></li><li guid="_af0870ce-fb73-4f38-bf21-1e69306474e9" id="sec.53-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">maps that show where the activities are proposed to be carried out;</txt></block></li><li guid="_da454c82-1959-431c-8f65-91621ca7b0d1" id="sec.53-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the composition of GHG streams proposed to be injected under the GHG permit;</txt></block></li><li guid="_dc871067-0fd8-44d7-92c2-ab417d56dcce" id="sec.53-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">a description of any pipeline land for the GHG permit;</txt></block></li><li guid="_b56a464a-643e-44ce-bcd7-8f8e7c9bb036" id="sec.53-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">reasons why the program is considered appropriate;</txt></block></li><li guid="_f8248163-0c49-4be6-a1ce-f9a5ab1df96a" id="sec.53-ssec.1-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">another matter prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_abe08c9f-c64d-4f44-b215-f5749c5bb9ad" id="sec.53-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The proposed program may include any other information relevant to the work program criteria.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_59fc2ddb-6ba1-4dc4-988d-c100b3be3201" id="sec.53-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The composition of GHG streams to be injected under the proposed GHG permit must comply with <intref check="valid" refid="sec.83" target.guid="_15aa3dd9-c0a2-4fbe-a17d-615681fb1d8d">section 83</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_71be46d6-92b1-4545-b700-73542765c8d9" id="sec.53-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A regulation may impose requirements about the form of the work program.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0f6e483c-9ca4-4727-8194-0bfeb7f41be6" id="sec.53-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_e76a28ac-f4a7-45aa-ab00-7b830f3e8506" id="sec.53-ssec.5-def.year_"><txt break.before="1"><defterm guid="_b19fbdb6-4b3d-4d42-afae-bb65a65ac02b" id="sec.53-ssec.5-def.year" type="definition">year</defterm>, of the program period, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_784e25be-a14f-41e4-a8ac-440f3e1dff00" id="sec.53-ssec.5-def.year-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the period starting on the day the program period starts and ending on the first anniversary of that day; and</txt></block></li><li guid="_94bbbc0b-8c52-4e57-81f3-e4ff2595ad5e" id="sec.53-ssec.5-def.year-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">each subsequent period of 12 months or less during the program period starting on each anniversary of that day and ending on—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f2a0d44b-fe89-41aa-b751-569d6d089d9d" id="sec.53-ssec.5-def.year-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the next anniversary of that day; or</txt></block></li><li guid="_c7fa49d2-e70c-4981-828c-3e3cde182dbe" id="sec.53-ssec.5-def.year-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the program period ends before the next anniversary—the day the program period ends.</txt></block></li></list></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e0bf30c9-ca25-4493-b43a-35633dc31d5f" id="sec.54" provision.type="other" spent.amends="0"><no>54</no><heading guid="_7bd499bd-05db-4270-ae2f-5e0e9e8875fb" id="sec.54-he">Water issues</heading><subclause affected.by.uncommenced="0" guid="_95671881-75a3-4662-b1ca-522c7ed02d61" id="sec.54-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">In preparing the proposed work program, the proposed GHG permit holder must have regard to potential groundwater issues.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0168eb84-19b0-4e8c-ab2f-a47c6a07c5b9" id="sec.54-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The proposed work program must include a plan for the treatment and disposal of any water taken or that may be taken because of the carrying out of authorised activities for the proposed GHG permit.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_b4290a58-4ce6-4f67-9368-8817fb71d71f" id="ch.2-pt.4-div.3"><no>Division 3</no><heading guid="_eae97ee8-7370-4651-9e96-a6adbd3c4a1a" id="ch.2-pt.4-div.3-he">Approval of proposed initial work programs</heading><note guid="_90025d74-9d0e-4a26-968c-6c4edd46683c" id="ch.2-pt.4-div.3-note" type="example"><heading guid="_083628a7-814a-4722-a168-a20568201328" id="ch.2-pt.4-div.3-note-he">Note—</heading><block><txt break.before="1">For the requirement for approval of an initial work program, see <intref check="valid" refid="sec.40" target.guid="_289f7458-d97e-4fae-b566-d733e8a7235e">section 40</intref> (Deciding whether to grant GHG permit).</txt></block></note><clause affected.by.uncommenced="0" guid="_35a2e740-d43b-4895-835d-bb2272afeda8" id="sec.55" provision.type="other" spent.amends="0"><no>55</no><heading guid="_71bad8ba-f6e7-46d5-bb3f-f7cc9a82b440" id="sec.55-he">Criteria</heading><subclause affected.by.uncommenced="0" guid="_0c4a0786-43f3-4167-afc2-69649dfd6e6b" id="sec.55-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">In deciding whether to approve a proposed initial work program the Minister must consider—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c1264912-6a92-4ef4-b5f2-55500d4e06f3" id="sec.55-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the potential of the proposed area of the GHG permit for GHG storage exploration; and</txt></block></li><li guid="_ab9b70ed-9cab-4175-ac37-a206c35fe9ec" id="sec.55-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the extent and nature of and when and where the tenderer proposes to carry out the proposed GHG storage exploration; and</txt></block></li><li guid="_d4b1fcb0-7eeb-4785-a396-ccef6e6b16b5" id="sec.55-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">any relevant authorisation required under the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7e40f9f0-e6c1-438b-8048-aef472ee0e35" id="sec.55-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The matters mentioned in <intref check="valid" refid="sec.55-ssec.1" target.guid="_0c4a0786-43f3-4167-afc2-69649dfd6e6b">subsection (1)</intref> are the <defterm guid="_5dc746c5-4ad4-4f3f-8e58-685da7eed626" id="sec.55-def.workprogramcriteria" type="definition">work program criteria</defterm>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_9e3adc7d-3d4e-4ebc-b119-c603debad9f1" id="sec.56" provision.type="other" spent.amends="0"><no>56</no><heading guid="_5c3b425b-c89f-4e5b-8c60-40f19ce75881" id="sec.56-he">Verification may be required</heading><subclause affected.by.uncommenced="0" guid="_e5e1c014-1257-40ff-8025-5dbb8c312bd6" id="sec.56-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may by notice require the applicant to give the Minister within a stated reasonable period a document made by an appropriately qualified independent person that verifies—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bbc9dec3-e839-4f8f-9fe4-ee4e6231818a" id="sec.56-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an assessment of data supplied in the proposed initial work program; or</txt></block></li><li guid="_4c377e00-ffa4-4192-83fe-4a21a35bfa6f" id="sec.56-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the source of the data; or</txt></block></li><li guid="_1609931f-b0c5-4eae-b70a-1dbf93c1d4f1" id="sec.56-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the work done for the proposed program; or</txt></block></li><li guid="_1326c587-e658-4fdf-8ae8-d1fd10762cb4" id="sec.56-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">that, in the person’s opinion, the applicant has—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b256e545-7afe-4585-a1e8-4c427870ff7c" id="sec.56-ssec.1-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the financial and technical resources to carry out authorised activities for the proposed GHG permit; and</txt></block></li><li guid="_0ceaad04-d342-4a7e-a0f9-1de858b44d7d" id="sec.56-ssec.1-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the ability to manage GHG storage exploration.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9a48aec9-7faa-41c2-a56d-97badf04c5f6" id="sec.56-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the applicant does not comply with the requirement, the Minister may refuse to approve the proposed program.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6e3a4bf5-f5fb-44ce-a02c-5dadb291774c" id="sec.56-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The applicant must pay any costs incurred in complying with the requirement.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e46ff1b6-3f97-4d83-8b29-afd7d2a87bb0" id="sec.57" provision.type="other" spent.amends="0"><no>57</no><heading guid="_9362fcd0-b4c0-4dfa-a22f-6c4373ce13c7" id="sec.57-he">Referral to Water Act Minister</heading><block><txt break.before="1">The Minister can not approve the proposed work program unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3ba33894-8202-4669-b2d7-3e1388fab9b9" id="sec.57-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the Minister has given the Water Act Minister a copy of the proposed work program; and</txt></block></li><li guid="_5aced556-abc1-4ccc-9979-ea5a02a2908a" id="sec.57-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Water Act Minister has approved the proposed work program to the extent it relates to potential groundwater issues.</txt></block></li></list></block></clause></division><division affected.by.uncommenced="0" guid="_c275894f-333c-47b9-ad1c-d05121855d74" id="ch.2-pt.4-div.4"><no>Division 4</no><heading guid="_24c615ce-d874-415e-a8c1-3e35ca02e8ae" id="ch.2-pt.4-div.4-he">Requirements for proposed later work programs</heading><clause affected.by.uncommenced="0" guid="_c0963fe2-7d05-4998-b04c-4fe887dd3250" id="sec.58" provision.type="other" spent.amends="0"><no>58</no><heading guid="_380dc668-1c31-423f-95a9-aa36b73f293a" id="sec.58-he">Operation of <intref check="valid" refid="ch.2-pt.4-div.4" target.guid="_c275894f-333c-47b9-ad1c-d05121855d74">div 4</intref></heading><block><txt break.before="1">This division provides for requirements (the <defterm guid="_a4f79c78-b640-41cf-ad01-4e37217ff7bd" id="def.laterworkprogramrequirements" type="definition">later work program requirements</defterm>) for a proposed later work program for a GHG permit.</txt><note guid="_768bdb24-dd1b-425b-9456-0a360d307e96" id="sec.58-note" type="example"><heading guid="_d712277d-9a7c-4c40-ac69-a9febd4775e5" id="sec.58-note-he">Note—</heading><block><txt break.before="1">For the requirements to give a proposed later work program, see <intref check="valid" refid="sec.91" target.guid="_fe8c5e9a-9b3a-4f53-bfaf-10b3c837ba1f">sections 91</intref> (Obligation to give proposed later work program), 138 (Minister may add excluded land) and 379 (Types of noncompliance action that may be taken).</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_b73e70a2-690a-4547-b574-3740381ceb0e" id="sec.59" provision.type="other" spent.amends="0"><no>59</no><heading guid="_6aba6384-ed7a-4c32-a1bc-e98a54e974ff" id="sec.59-he">General requirements</heading><block><txt break.before="1">The proposed program must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a26ba5e9-bdad-4b77-a81e-79937c211a79" id="sec.59-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">other than for the program period, comply with the initial work program requirements; and</txt></block></li><li guid="_e34b72dd-0ecf-4337-8e76-3c3b72e7debd" id="sec.59-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state the extent to which the current work program for the GHG permit has been complied with; and</txt></block></li><li guid="_b5330dc4-98c0-4eae-b544-4b73e17b1e9c" id="sec.59-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if there have been any amendments to the GHG permit or the current work program, state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_23819034-f1c0-4ca0-b628-103132143150" id="sec.59-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">whether the changes have been incorporated in the proposed program; and</txt></block></li><li guid="_30bd45e0-393a-422a-bd53-aa721dad3012" id="sec.59-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">any effect the changes have on the proposed program; and</txt></block></li></list></block></li><li guid="_0ea1bb77-dad7-4f79-935c-0de3aa64be28" id="sec.59-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">state the effect of the discovery of any GHG stream storage site on the proposed program.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_0ebd4592-5275-43f7-b45d-f4a6ae2de0ed" id="sec.60" provision.type="other" spent.amends="0"><no>60</no><heading guid="_7fba7417-0b24-488e-9c33-dc160fd52f80" id="sec.60-he">Program period</heading><subclause affected.by.uncommenced="0" guid="_0915e580-ee7e-4df6-b23c-c2c99fad9303" id="sec.60-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The proposed program must state its period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0cd295dc-da09-4170-be11-ed272ac3e916" id="sec.60-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The period must not be longer than—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a6b6c91a-789c-4158-ad1e-8639f01f5559" id="sec.60-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the term of the rest, or the renewed term, of the GHG permit is less than 4 years—the rest of its term or renewed term; or</txt></block></li><li guid="_2ecb2e86-1ecd-41c0-b56a-92fb81d3f023" id="sec.60-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the term of the rest, or the renewed term, of the GHG permit is 4 years or more, the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_84b7e505-4066-459e-b402-d63fd648da2f" id="sec.60-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">generally—4 years from the start of the period;</txt></block></li><li guid="_2456c56d-6540-45be-a2ff-5547853a2379" id="sec.60-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the Minister approves a longer period—the longer period.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0cfed1a0-0ab2-443f-8a73-3a3c57fe4ba4" id="sec.60-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the Minister can not approve a period longer than the rest of the term or renewed term of the GHG permit.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e70456ae-8d36-46d9-b4ef-deff14a3ed4e" id="sec.61" provision.type="other" spent.amends="0"><no>61</no><heading guid="_d144397f-49d6-4a52-bf91-2721e9b33e37" id="sec.61-he">Implementation of evaluation program for potential storage area</heading><block><txt break.before="1">If under <intref check="valid" refid="sec.103" target.guid="_dbbdbdde-3f47-4d3f-9951-fbba4fe159be">section 103</intref>, an evaluation program is taken to be an additional part of the existing work program for the GHG permit, the proposed program must include work necessary to implement the evaluation program for the period of that program.</txt></block></clause></division><division affected.by.uncommenced="0" guid="_f7cf9157-c2f2-4479-9b47-1c020758039c" id="ch.2-pt.4-div.5"><no>Division 5</no><heading guid="_783055a5-86e0-4155-b7d2-6d10f83af689" id="ch.2-pt.4-div.5-he">Approval of proposed later work programs</heading><clause affected.by.uncommenced="0" guid="_ca07d031-5102-4f07-b95e-2da26c6adf4e" id="sec.62" provision.type="other" spent.amends="0"><no>62</no><heading guid="_adda1fa6-8ff7-439d-994a-429e40f21cd9" id="sec.62-he">Application of <intref check="valid" refid="ch.2-pt.4-div.5" target.guid="_f7cf9157-c2f2-4479-9b47-1c020758039c">div 5</intref></heading><block><txt break.before="1">This division applies if, under this Act, a proposed later work program is given to the Minister for approval.</txt></block></clause><clause affected.by.uncommenced="0" guid="_96f1b7f4-76ca-4de2-9464-384d694b7797" id="sec.63" provision.type="other" spent.amends="0"><no>63</no><heading guid="_8f909384-1d42-4726-baad-c2b30a5e88e8" id="sec.63-he">GHG permit taken to have work program until decision on whether to approve proposed work program</heading><subclause affected.by.uncommenced="0" guid="_b632639a-3273-4e81-b0a4-20a7a43b0193" id="sec.63-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies until—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1d8a3db3-3a08-4514-a2f5-0dc070fd166b" id="sec.63-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the approval is given—the holder is given notice of the approval; or</txt></block></li><li guid="_9c390668-fd69-4da2-bc0b-2fd09c2c6f9b" id="sec.63-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the approval is refused—when the refusal takes effect.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e13655ab-baff-45be-93da-2058b946b245" id="sec.63-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite the ending of the program period for the current work program for the GHG permit—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dbf29c5f-1599-48e7-bd1b-4c6524669d65" id="sec.63-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the GHG permit is taken to have a work program; and</txt></block></li><li guid="_d0074374-befe-4d68-bf94-c5b1e8607b8e" id="sec.63-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder may carry out any authorised activity for the GHG permit.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_4d7cd017-f409-489a-ab54-42efd18e8cd9" id="sec.64" provision.type="other" spent.amends="0"><no>64</no><heading guid="_d071cbd2-40ca-4116-98d8-f9062b4f5846" id="sec.64-he">Deciding whether to approve proposed program</heading><subclause affected.by.uncommenced="0" guid="_36fd95a8-4c28-4781-b823-e089c4946526" id="sec.64-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may approve or refuse to approve the proposed program.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_47054f3c-7c87-4d8a-8045-304c957a0d11" id="sec.64-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In deciding whether to approve the proposed program the Minister must consider each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d174c2f7-8ee7-4632-8246-5cc4dae3b3ea" id="sec.64-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the work program criteria and capability criteria and any special criteria that applied for deciding the application for the GHG permit;</txt></block></li><li guid="_b133c8c9-2133-4868-91b3-8cbe62a25bad" id="sec.64-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the extent to which the current work program has been complied with;</txt></block></li><li guid="_c05082a4-fc87-4d6c-ac7b-fbed468d4a01" id="sec.64-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">any amendments made to the GHG permit or its current work program and the reasons for the changes;</txt></block></li><li guid="_5d49f56d-8d99-477b-893c-597f36c8e518" id="sec.64-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">any GHG storage viability report or independent viability assessment for the GHG permit.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_65922460-2ee3-4b1b-8eec-cc85eb7931de" id="sec.64-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, if the GHG permit was granted in response to a tender, any other work program proposed by other tenderers for the permit must be considered.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e16b1415-70bf-4bbf-8883-f023ac8fd43e" id="sec.64-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.64-ssec.3" target.guid="_65922460-2ee3-4b1b-8eec-cc85eb7931de">subsection (3)</intref> applies only to the extent the other program includes the period of the proposed plan.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_6b320234-a142-4f0c-aa61-3ff0c705bacb" id="sec.65" provision.type="other" spent.amends="0"><no>65</no><heading guid="_4686d0cd-b909-41ed-b5bf-ce0effa1d8b7" id="sec.65-he">Steps after, and taking effect of, decision</heading><subclause affected.by.uncommenced="0" guid="_5b850153-e2b4-4ea8-9f6b-8b6c85233a6e" id="sec.65-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the Minister decides to approve the proposed later work program, the Minister must give the holder notice of the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_83acb692-01be-4327-91db-dbac388376d7" id="sec.65-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the Minister decides to refuse to approve the later work program, the Minister must give the holder an information notice about the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7b8d7708-837f-422e-96ca-b68e3a563753" id="sec.65-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">An approval takes effect when the holder is given the notice or if the notice states a later day of effect, on that later day.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2ae7503c-2242-4cf8-aa23-ffd3266ea330" id="sec.65-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A refusal does not take effect until the end of the appeal period for the decision to refuse.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_04d6f661-a1b6-4c21-8726-2050886bee6a" id="ch.2-pt.4-div.6"><no>Division 6</no><heading guid="_e7e64e1b-045d-4d11-87cf-f6eb3048fcea" id="ch.2-pt.4-div.6-he">Amending work programs</heading><clause affected.by.uncommenced="0" guid="_372a00e7-8392-4d2e-939c-66e32ba2c22e" id="sec.66" provision.type="other" spent.amends="0"><no>66</no><heading guid="_b0a73a04-2244-4e4c-a02f-56eed722bb72" id="sec.66-he">Restrictions on amending work program</heading><subclause affected.by.uncommenced="0" guid="_62c872f0-4324-4d23-9ff8-07c994b5424b" id="sec.66-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A GHG permit holder may amend the work program for the permit only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7bfbe38c-47c9-4535-814d-8edfaf85622e" id="sec.66-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an application for approval of the amendment has been made under this division and the amendment has been approved under this division; and</txt></block></li><li guid="_ae1bb2c8-2118-4e8b-9635-fdd650f970fd" id="sec.66-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the amendment is to extend the period of the work program—the requirements under <intref check="valid" refid="sec.66-ssec.2" target.guid="_2b6d69e7-7102-4527-911e-cd9d843b6b45">subsection (2)</intref> have been complied with.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2b6d69e7-7102-4527-911e-cd9d843b6b45" id="sec.66-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.66-ssec.1" target.guid="_62c872f0-4324-4d23-9ff8-07c994b5424b">subsection (1)</intref><intref check="valid" refid="sec.66-ssec.1-para1.b" target.guid="_ae1bb2c8-2118-4e8b-9635-fdd650f970fd">(b)</intref>, the requirements are each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d9c6f21e-0131-458d-bc4e-91de2e43a783" id="sec.66-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the work program is the initial work program for the GHG permit—the Minister must be satisfied the work program needs to be amended for a reason beyond the holder’s control;</txt></block></li><li guid="_e1ff41e5-c961-4981-8539-0dc3bab01274" id="sec.66-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the period of the work program, or any earlier work program for the GHG permit, must not have previously been extended;</txt></block></li><li guid="_a1a33ddb-2e82-4583-9d5d-920191e93b59" id="sec.66-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the extension can not be for a term that ends later than—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3c9f6a6f-a68a-4f3f-af7d-f449b115cf0d" id="sec.66-ssec.2-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">1 year after the current period of the work program; or</txt></block></li><li guid="_9cb80c93-a831-4261-ac55-67cff0c78686" id="sec.66-ssec.2-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">12 years after the GHG permit originally took effect;</txt></block></li></list></block></li><li guid="_3cc17046-004e-4887-b2bc-e3073c36225b" id="sec.66-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">within 3 months before the making of the application—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0c044902-6ba5-43b1-a0ea-fdd385e29aa5" id="sec.66-ssec.2-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a person (the <defterm guid="_324e89fa-307c-4858-a11d-c908411a6bdb" id="sec.66-ssec.2-para1.d-def.designatedperson" type="definition">designated person</defterm>) became a holder of the GHG permit; or</txt></block></li><li guid="_40fbb29b-9722-4f94-a9b5-ee3f59580f3e" id="sec.66-ssec.2-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a person (also the <defterm guid="_55b0b5cb-d154-41cd-a711-9759773998b1" id="sec.66-ssec.2-para1.d-def.designatedperson-oc.2" type="definition">designated person</defterm>) obtained registration of a transfer of a share in the GHG permit;</txt></block></li></list></block></li><li guid="_121a7274-dfaf-4f53-a3a3-cbc9fbe077f8" id="sec.66-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the share or proposed share of the designated person in the GHG permit is at least 50%;</txt></block></li><li guid="_9f711f0c-6174-40e2-846e-1e38f0fad2f7" id="sec.66-ssec.2-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">the designated person is not under the <legref check="invalid" jurisd="CTH" type="act"><name emphasis="no">Corporations Act</name></legref>, <legref check="invalid" jurisd="CTH" type="act">section 64B</legref>, an entity connected with another person who is a holder of the GHG permit.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_16da0207-caae-4877-9c01-bda7db7add9a" id="sec.67" provision.type="other" spent.amends="0"><no>67</no><heading guid="_5617bf4b-1a6e-431d-b0ed-fa121a1d546e" id="sec.67-he">Applying for approval to amend</heading><subclause affected.by.uncommenced="0" guid="_abaa716e-ba88-42ea-9e8d-7625be4f0c57" id="sec.67-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A GHG permit holder may apply for approval to amend the work program for the permit.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b1f30240-d34a-4dff-8f86-9b8284c8b73e" id="sec.67-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the application can not be made less than 20 business days before the end of the period stated in the work program for carrying out work under the program.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5528958d-ed7b-4323-84c5-022a3118db5d" id="sec.67-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0"><intref check="valid" refid="sec.67-ssec.2" target.guid="_b1f30240-d34a-4dff-8f86-9b8284c8b73e">Subsection (2)</intref> does not apply if the Minister is satisfied the work program needs to be amended for a reason beyond the holder’s control.</txt><note guid="_70c404f3-b45f-4583-9a1e-22108aa1501f" id="sec.67-ssec.3-note" type="example"><heading guid="_68c16d99-f1eb-450c-9784-8afbbb17ad0a" id="sec.67-ssec.3-note-he">Note—</heading><block><txt break.before="1">For other relevant provisions about applications, see <intref check="valid" refid="ch.7" target.guid="_c71c8b11-e33d-4d92-93a5-6b36981ef2af">chapter 7</intref>, <intref check="valid" refid="ch.7-pt.1" target.guid="_52045836-8aa9-4370-bd20-28391b2a1028">part 1</intref>.</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_80132dd8-be4a-4645-9def-31caa1d83b38" id="sec.68" provision.type="other" spent.amends="0"><no>68</no><heading guid="_ce68e70f-3332-4cfd-8eeb-8396258720b5" id="sec.68-he">Requirements for making application</heading><block><txt break.before="1">The application must be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_31f8ef14-3bc3-4904-96fd-a9ef57a4a300" id="sec.68-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">made to the Minister in the approved form; and</txt></block></li><li guid="_b1506fb0-a3fc-4b6f-bd65-87dade8547f3" id="sec.68-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">accompanied by the fee prescribed under a regulation.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_8a9922a1-04bb-4d45-a74c-05d6cc4ce8e9" id="sec.69" provision.type="other" spent.amends="0"><no>69</no><heading guid="_b8070ce1-dd17-4a50-a6b1-67fad7ba1e57" id="sec.69-he">Deciding application</heading><subclause affected.by.uncommenced="0" guid="_a076ad82-fb06-4547-b320-cce07a2ee4ff" id="sec.69-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the proposed amendment—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1e32fb72-342e-4e7e-a603-5ed54455dd04" id="sec.69-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">does not relate to the initial work program for the GHG permit; and</txt></block></li><li guid="_14b3d766-b618-4781-af3b-81e549365f57" id="sec.69-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is to substitute the carrying out of an authorised activity (the <defterm guid="_196f446e-54fe-433c-8645-63ef915ce710" id="sec.69-ssec.1-def.originalactivity" type="definition">original activity</defterm>) with another authorised activity;</txt></block></li></list></block><block><txt break.before="1">the Minister may approve the amendment only if satisfied the other activity is at least of an equivalent use for GHG storage exploration as the original activity.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_111bdebb-83d5-433d-b963-c3d8b137624e" id="sec.69-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the application is to extend the period of the work program for the GHG permit, the Minister may approve the amendment only if satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_264250fa-deff-4884-b2ca-55c42b789490" id="sec.69-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the requirements under <intref check="valid" refid="sec.66" target.guid="_372a00e7-8392-4d2e-939c-66e32ba2c22e">section 66</intref><intref check="valid" refid="sec.66-ssec.2" target.guid="_2b6d69e7-7102-4527-911e-cd9d843b6b45">(2)</intref> have been complied with; and</txt></block></li><li guid="_fdb25c27-a96f-4c5c-8454-8739b8e97498" id="sec.69-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the designated person mentioned in <intref check="valid" refid="sec.66" target.guid="_372a00e7-8392-4d2e-939c-66e32ba2c22e">section 66</intref><intref check="valid" refid="sec.66-ssec.2" target.guid="_2b6d69e7-7102-4527-911e-cd9d843b6b45">(2)</intref> is likely to provide additional financial or technical resources for the GHG permit; and</txt></block></li><li guid="_45ef4540-c4d8-445c-8ce2-eb23670b5f09" id="sec.69-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the work program will be finished within the period of the extension.</txt></block></li></list><note guid="_fa60bf8b-94b7-4c0c-a236-9b2d3ef406de" id="sec.69-ssec.2-note" type="example"><heading guid="_60e0966f-b3aa-48d9-a16a-a87cffcd3051" id="sec.69-ssec.2-note-he">Note—</heading><block><txt break.before="1">For additional provisions about relinquishment if the period is extended, see <intref check="valid" refid="sec.72" target.guid="_78fd1d26-ab60-487c-bf3b-7a576b2a3aa2">sections 72</intref><intref check="valid" refid="sec.72-ssec.1" target.guid="_53dd2515-8367-493b-9f74-f143817e080c">(1)</intref><intref check="valid" refid="sec.72-ssec.1-para1.c" target.guid="_20ce8abd-e64d-48c2-9a7d-371cedd3cbeb">(c)</intref> and <intref check="valid" refid="sec.90" target.guid="_a9b257bd-7406-43be-91f1-5bae9a4d0574">90</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_6d324f11-f98c-422d-80e6-882f2507729d" id="sec.69-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Otherwise, the Minister may approve the amendment only if satisfied it is necessary because of a circumstance—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1deaae3d-45e8-4edc-b21e-aae5168cddb4" id="sec.69-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">not related to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b4ca2b32-9123-4c94-a8d1-6bb5c5d488d1" id="sec.69-ssec.3-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the applicant’s financial or technical resources or ability to manage GHG storage exploration; or</txt></block></li><li guid="_2aa2d101-4845-4181-8eb1-1cdc7129d72d" id="sec.69-ssec.3-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the results of exploration; and</txt></block></li></list></block></li><li guid="_61fdf8e0-93c7-4523-9534-a7060108d6d4" id="sec.69-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the happening of which is or was beyond the applicant’s control; and</txt></block></li><li guid="_30e6b99a-a469-4087-a9ed-d5039de7e846" id="sec.69-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that could not have been prevented by a reasonable person in the applicant’s position.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9a61abfa-408d-480d-b96c-dfc75727db15" id="sec.69-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Also, if the amendment is approved under <intref check="valid" refid="sec.69-ssec.3" target.guid="_6d324f11-f98c-422d-80e6-882f2507729d">subsection (3)</intref>, any relinquishment day for the GHG permit may be deferred for a period relating to a circumstance mentioned in <intref check="valid" refid="sec.69-ssec.3" target.guid="_6d324f11-f98c-422d-80e6-882f2507729d">subsection (3)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ab3fc389-49ae-44c8-accb-6ef46a8b2e15" id="sec.69-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">A deferral under <intref check="valid" refid="sec.69-ssec.4" target.guid="_9a61abfa-408d-480d-b96c-dfc75727db15">subsection (4)</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e359463b-3fe0-47b3-a3b5-870a7020c84f" id="sec.69-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">can not be for longer than 12 years after the GHG permit took effect; and</txt></block></li><li guid="_29ba7d5e-93b2-4daa-bc96-1b8c33c92e8d" id="sec.69-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">does not defer any later relinquishment day for the GHG permit.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_753fa657-0772-4537-98e1-6f7682bfa6eb" id="sec.69-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">If under this section an amendment is approved, a condition may be imposed on the GHG permit requiring its holder to relinquish by a notice to the chief executive at least a stated percentage of the permit’s area on or before a stated day.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f334ea4f-8aa1-4bd5-9eac-074b80c5683b" id="sec.70" provision.type="other" spent.amends="0"><no>70</no><heading guid="_1cb383de-d177-49c8-b2a9-0e0eb4bfdd5f" id="sec.70-he">Steps after, and taking effect of, decision</heading><subclause affected.by.uncommenced="0" guid="_b876acc1-2ffd-48c1-b2cf-923de5abc4ae" id="sec.70-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the Minister decides to approve the proposed amendment, the Minister must give the holder notice of the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1652e51e-ac74-498e-a8b3-b70b1c661fc9" id="sec.70-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the Minister decides to refuse to approve the proposed amendment, the Minister must give the applicant an information notice about the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ed950cc4-a1df-401b-8082-ae507a59383c" id="sec.70-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The refusal takes effect when the holder is given the notice or if the notice states a later day of effect, on that later day.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_07c486d0-f89b-471e-a460-688e77359ec5" id="ch.2-pt.5"><no>Part 5</no><heading guid="_2f5b4fcb-a981-45e8-b349-6ce2f508f126" id="ch.2-pt.5-he">Key mandatory conditions</heading><division affected.by.uncommenced="0" guid="_6e8977b6-c7ee-4189-8309-0bdb4375c01f" id="ch.2-pt.5-div.1"><no>Division 1</no><heading guid="_0c214395-045c-4ad6-99aa-91b09984557f" id="ch.2-pt.5-div.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_b4819b97-0355-4260-b2a5-fbfcea805475" id="sec.71" provision.type="other" spent.amends="0"><no>71</no><heading guid="_159ed305-a8ac-4c43-a3cf-5bb6d0ee06b1" id="sec.71-he">Operation of <intref check="valid" refid="ch.2-pt.5" target.guid="_07c486d0-f89b-471e-a460-688e77359ec5">pt 5</intref></heading><block><txt break.before="1">This part provides for particular mandatory conditions for GHG permits.</txt></block></clause></division><division affected.by.uncommenced="0" guid="_d7569dea-0951-4b40-9511-fc4ed4829b41" id="ch.2-pt.5-div.2"><no>Division 2</no><heading guid="_43334820-6e97-4a88-8077-b09ad5ad5bb8" id="ch.2-pt.5-div.2-he">Standard relinquishment condition and related provisions</heading><clause affected.by.uncommenced="0" guid="_78fd1d26-ab60-487c-bf3b-7a576b2a3aa2" id="sec.72" provision.type="other" spent.amends="0"><no>72</no><heading guid="_866a47ca-c7f2-46c7-a887-9beb89f9a3b1" id="sec.72-he">Standard relinquishment condition</heading><subclause affected.by.uncommenced="0" guid="_53dd2515-8367-493b-9f74-f143817e080c" id="sec.72-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">It is a condition (the <defterm guid="_b028f95a-ea2b-4484-b52c-463744d295aa" id="sec.72-def.relinquishmentcondition" type="definition">relinquishment condition</defterm>) of each GHG permit that its holder must relinquish part of its area as provided for under this division—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_203c2147-f9a0-4ca2-af31-cc5911fb0749" id="sec.72-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">on or before each of its relinquishment days; and</txt></block></li><li guid="_cf2ed9df-9ed6-447a-92e8-08d98570588b" id="sec.72-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if <intref check="valid" refid="sec.76" target.guid="_b437a610-45da-489c-b5ca-58fc0b7c7ffe">section 76</intref><intref check="valid" refid="sec.76-ssec.3" target.guid="_c3d440fc-be0f-4088-8de2-deab8ac42bce">(3)</intref> applies—on the day provided for under that subsection; and</txt></block></li><li guid="_20ce8abd-e64d-48c2-9a7d-371cedd3cbeb" id="sec.72-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if under <intref check="valid" refid="ch.2-pt.4" target.guid="_53fb6f4f-0594-47f9-8ba9-bcbacb27f25f">part 4</intref>, <intref check="valid" refid="ch.2-pt.4-div.6" target.guid="_04d6f661-a1b6-4c21-8726-2050886bee6a">division 6</intref>, the period of the work program for the GHG permit has been extended—the day on which the extended period ends.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_bf419e31-eb24-4d53-bfde-0fbdf149682f" id="sec.72-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if under <intref check="valid" refid="sec.69" target.guid="_8a9922a1-04bb-4d45-a74c-05d6cc4ce8e9">section 69</intref><intref check="valid" refid="sec.69-ssec.4" target.guid="_9a61abfa-408d-480d-b96c-dfc75727db15">(4)</intref>, a relinquishment day for the GHG permit (the <defterm guid="_60a6bffa-b4fa-421d-854a-b04f9068a4e6" id="sec.72-def.originalday" type="definition">original day</defterm>) is deferred for a stated period, for the relinquishment condition—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f737c804-0f09-433a-b83d-41fa9bfb8586" id="sec.72-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the relinquishment that was required on or before the original day is taken to have been deferred until the end of the stated period; but</txt></block></li><li guid="_f596ef4f-643f-4ab4-b138-62a44e2af355" id="sec.72-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the relinquishments required under the relinquishment condition on any later relinquishment days for the GHG permit must be made as if the deferral has not been granted.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2c8a4089-9021-4600-a325-e1fef72c9259" id="sec.72-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A relinquishment required under the relinquishment condition—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b8e72ccf-2fd7-403a-b527-d0cdeb1198a0" id="sec.72-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must be made by notice to the chief executive (a <defterm guid="_031291d0-8a78-4aeb-8aa8-8eff341a46b3" id="sec.72-ssec.3-def.relinquishmentnotice" type="definition">relinquishment notice</defterm>); and</txt></block></li><li guid="_fc8b6920-24f9-4200-b6ae-da10a568c797" id="sec.72-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">takes effect on the day after the notice is given.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0119343d-26aa-4030-b1dd-76253dac89d9" id="sec.72-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">This section does not prevent the holder from relinquishing by relinquishment notice more than the part provided for under this division.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d5936260-9555-42f5-aa0a-e1c7f74c1d07" id="sec.73" provision.type="other" spent.amends="0"><no>73</no><heading guid="_5c649e68-0280-4229-8338-027b139ea8c3" id="sec.73-he">Consequence of failure to comply with relinquishment condition</heading><subclause affected.by.uncommenced="0" guid="_889196b1-eafe-4696-a612-6c0058d68660" id="sec.73-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the holder of a GHG permit does not comply with the relinquishment condition, the Minister must give the holder a notice requiring the holder to comply with the condition within 20 business days after the giving of the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5b71bb16-d438-48d7-82f6-4f4656cb52eb" id="sec.73-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the holder does not comply with the requirement, the GHG permit is cancelled.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_4bdeced6-0f66-44bf-9f4e-811350b1a7e3" id="sec.74" provision.type="other" spent.amends="0"><no>74</no><heading guid="_c9b5ce87-984e-421f-8217-21ddf1db96af" id="sec.74-he">Part usually required to be relinquished</heading><subclause affected.by.uncommenced="0" guid="_c1f132d4-4b57-4853-8bc8-b421df45cbd7" id="sec.74-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies for the relinquishment for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_99f56daa-5960-400b-9632-158f9a34d0ab" id="sec.74-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">each relinquishment day for the GHG permit; and</txt></block></li><li guid="_909bde66-3bd6-4c68-9e33-f8fea70c17d0" id="sec.74-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any other day mentioned in <intref check="valid" refid="sec.72" target.guid="_78fd1d26-ab60-487c-bf3b-7a576b2a3aa2">section 72</intref><intref check="valid" refid="sec.72-ssec.1" target.guid="_53dd2515-8367-493b-9f74-f143817e080c">(1)</intref><intref check="valid" refid="sec.72-ssec.1-para1.b" target.guid="_cf2ed9df-9ed6-447a-92e8-08d98570588b">(b)</intref> or <intref check="valid" refid="sec.72-ssec.1-para1.c" target.guid="_20ce8abd-e64d-48c2-9a7d-371cedd3cbeb">(c)</intref> that applies to the GHG permit.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ea254563-5c83-417e-84c6-e6a551c650f8" id="sec.74-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The relinquishment must have the effect that by the day at least 8.33% of the original sub-blocks of the permit have been relinquished for each year that has passed since the GHG permit originally took effect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_983010e7-d881-4f6b-bb77-35128d20eb53" id="sec.74-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">This section is subject to <intref check="valid" refid="sec.76" target.guid="_b437a610-45da-489c-b5ca-58fc0b7c7ffe">sections 76</intref> and <intref check="valid" refid="sec.77" target.guid="_0ce166e6-3685-4464-9e51-7edb9b23675b">77</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_6d37956a-f748-4856-99ed-39b8e91609ae" id="sec.75" provision.type="other" spent.amends="0"><no>75</no><heading guid="_a62e1b89-6734-4ebc-b74b-fe90684d39f8" id="sec.75-he">Sub-blocks that can not be counted towards relinquishment</heading><subclause affected.by.uncommenced="0" guid="_c9aa56e6-abdb-484e-93fd-0cbda08fef74" id="sec.75-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The following can not be counted as sub-blocks relinquished for the relinquishment condition—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a0e3b375-ee44-467a-94b5-4d021fd6fb06" id="sec.75-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">sub-blocks relinquished under a condition imposed under <intref check="valid" refid="sec.69" target.guid="_8a9922a1-04bb-4d45-a74c-05d6cc4ce8e9">section 69</intref><intref check="valid" refid="sec.69-ssec.6" target.guid="_753fa657-0772-4537-98e1-6f7682bfa6eb">(6)</intref>;</txt></block></li><li guid="_215a2080-9f93-461c-b754-bd8619aaa9c1" id="sec.75-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">sub-blocks in an area that under <intref check="valid" refid="sec.48" target.guid="_5ddb6410-88fa-4e9c-909a-1535eab66cf5">section 48</intref>, have ceased to be included in the GHG permit;</txt></block></li><li guid="_242a776c-ef57-4f98-b8b2-82ef3d63388f" id="sec.75-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the mere declaration of the sub-blocks as a potential storage area for the GHG permit;</txt></block></li><li guid="_930060e5-53a3-4792-87b8-c1a1db2fdfa0" id="sec.75-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">sub-blocks the subject of an application for a GHG lease or potential storage area;</txt></block></li><li guid="_79f3fa56-15bc-4f0f-995d-8dc1f9372657" id="sec.75-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">sub-blocks relinquished under a penalty relinquishment.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_10282bdc-4a3b-4e69-a10a-e59d2bf28011" id="sec.75-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">To remove any doubt, it is declared that a potential storage area can be relinquished and can be counted as an area relinquished for the relinquishment condition.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_adbb97aa-fa8a-4375-bc22-f097b0fc9450" id="sec.75-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_292e2eb2-fb7b-4eaf-bc10-c73ee3aafca6" id="sec.75-ssec.3-def.penaltyrelinquishment_"><txt break.before="1"><defterm guid="_2ef64534-4853-4d30-b6db-5968b881a5e8" id="sec.75-ssec.3-def.penaltyrelinquishment" type="definition">penalty relinquishment</defterm> means a relinquishment that is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3ba16f84-3c81-4f0e-960f-921c24d32273" id="sec.75-ssec.3-def.penaltyrelinquishment-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">made under <intref check="valid" refid="sec.90" target.guid="_a9b257bd-7406-43be-91f1-5bae9a4d0574">section 90</intref> or under a requirement under <intref check="valid" refid="sec.379" target.guid="_7bb5ce56-1401-4239-84f9-bb0e4d600312">section 379</intref><intref check="valid" refid="sec.379-ssec.1" target.guid="_1114e42f-311c-4d6a-b9fe-732194611d29">(1)</intref><intref check="valid" refid="sec.379-ssec.1-para1.b" target.guid="_359a447f-cac5-4925-9810-2b57b9ac1c00">(b)</intref>; and</txt></block></li><li guid="_c8b2d676-a780-4d68-a430-96fc2ea3150f" id="sec.75-ssec.3-def.penaltyrelinquishment-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">more than the sub-blocks required to be relinquished under the relinquishment condition.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b437a610-45da-489c-b5ca-58fc0b7c7ffe" id="sec.76" provision.type="other" spent.amends="0"><no>76</no><heading guid="_3c5ee7a1-8193-4399-8ef2-b46c9bb8df69" id="sec.76-he">Adjustments for sub-blocks that can not be counted</heading><subclause affected.by.uncommenced="0" guid="_ccf35c7b-97fd-4b6d-b558-d83a56efb92e" id="sec.76-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies for a relinquishment day if after taking away all sub-blocks that under <intref check="valid" refid="sec.75" target.guid="_6d37956a-f748-4856-99ed-39b8e91609ae">section 75</intref> can not be counted for the relinquishment condition, the balance of the sub-blocks of the GHG permit is less than the sub-blocks required to be relinquished under <intref check="valid" refid="sec.74" target.guid="_4bdeced6-0f66-44bf-9f4e-811350b1a7e3">section 74</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5609cb87-bc7b-4247-8be3-a412395f929b" id="sec.76-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The relinquishment condition is taken to have been complied with if the GHG permit holder gives a relinquishment notice for all of the balance.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c3d440fc-be0f-4088-8de2-deab8ac42bce" id="sec.76-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e1cd76d8-208a-472f-9bcd-cb6739f59438" id="sec.76-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a sub-block not counted for the relinquishment condition was the subject of an application for a GHG lease or potential storage area; and</txt></block></li><li guid="_ee6973b1-ae88-4923-90c8-7f15f2de8563" id="sec.76-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the result of the application is that it is refused;</txt></block></li></list></block><block><txt break.before="1">the GHG permit holder must within 20 business days after the appeal period for the decision to refuse give a relinquishment notice for that sub-block.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0ce166e6-3685-4464-9e51-7edb9b23675b" id="sec.77" provision.type="other" spent.amends="0"><no>77</no><heading guid="_b9c83c94-00fa-4e1b-a858-c9f56c768545" id="sec.77-he">Adjustment for particular potential storage areas</heading><block><txt break.before="1">If the only way to comply with the relinquishment condition is to relinquish all or part of a potential storage area for the GHG permit, the relinquishment condition is taken to be complied with if all remaining original sub-blocks of the permit are relinquished.</txt></block></clause><clause affected.by.uncommenced="0" guid="_6aa46762-3f6c-4423-89cd-ed2eb48bd5d6" id="sec.78" provision.type="other" spent.amends="0"><no>78</no><heading guid="_26a1e14c-5840-4395-a97f-b45ce26fd500" id="sec.78-he">Relinquishment must be by blocks</heading><subclause affected.by.uncommenced="0" guid="_9c5b3aac-5dc4-4e56-95dc-d3a1e615e0bd" id="sec.78-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A relinquishment under the relinquishment condition can only be by blocks.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_26ddf13a-9153-4451-b337-7691d14696bb" id="sec.78-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if a block contains an area that, under <intref check="valid" refid="sec.75" target.guid="_6d37956a-f748-4856-99ed-39b8e91609ae">section 75</intref> can not be counted as a relinquishment, <intref check="valid" refid="sec.78-ssec.1" target.guid="_9c5b3aac-5dc4-4e56-95dc-d3a1e615e0bd">subsection (1)</intref> is complied with if all of the rest of the land within the block is relinquished.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_ce763678-91f2-4e08-82e8-21fb096a1105" id="sec.79" provision.type="other" spent.amends="0"><no>79</no><heading guid="_6288c9c2-7ebe-4f64-9eed-89a13c2c8195" id="sec.79-he">Ending of GHG permit if all of its area relinquished</heading><block><txt break.before="1">If all of the area of a GHG permit is relinquished, the permit ends.</txt></block></clause></division><division affected.by.uncommenced="0" guid="_a9c8e5ec-88b8-482f-9ae7-a655e3094b1c" id="ch.2-pt.5-div.3"><no>Division 3</no><heading guid="_b6c7f1dd-278d-4770-9679-495410418436" id="ch.2-pt.5-div.3-he">Other mandatory conditions</heading><clause affected.by.uncommenced="0" guid="_e2d33391-9315-4a89-86de-cb6e698cfa0c" id="sec.80" provision.type="other" spent.amends="0"><no>80</no><heading guid="_c7c68cf1-3985-42ee-a81e-5b9423f9e781" id="sec.80-he">Compliance with test plan for GHG storage injection testing</heading><subclause affected.by.uncommenced="0" guid="_21c02459-ea61-44b8-80bc-b626479556db" id="sec.80-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A GHG permit holder may carry out GHG storage injection testing only in accordance with the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9917ef37-170d-4818-ad08-99edaf55d278" id="sec.80-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a test plan for that purpose approved by the Minister;</txt></block></li><li guid="_62558ace-1a37-4995-9d33-6a1b49c35212" id="sec.80-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">all conditions of the approval.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b8dd4c3a-46c4-4af7-a7d7-af02bbae7e1b" id="sec.80-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The holder may ask the Minister to approve a test plan proposed by the holder.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bd0cf134-c3cc-4a57-9003-ca4a60d914b0" id="sec.80-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The proposed test plan must comply with any requirements prescribed under a regulation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_cd438826-bc4c-4eb0-9c24-eb2adeb7f51f" id="sec.80-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The Minister may impose conditions on the granting of the approval.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6c7ddc37-b076-4c9e-8c0c-857e956b8120" id="sec.80-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the Minister decides to refuse to approve the proposed test plan or to impose conditions on the granting of the approval, the Minister must give the holder an information notice about the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_783b5ec4-9fc5-441b-8bed-7aa880556f16" id="sec.81" provision.type="other" spent.amends="0"><no>81</no><heading guid="_40f45a5f-0f45-42f4-8dd9-a1ed05a360cb" id="sec.81-he">Restriction on substances that may be used for GHG storage injection testing</heading><block><txt break.before="1">A GHG permit holder can not use a substance other than a GHG stream or water for injection for GHG storage.</txt></block></clause><clause affected.by.uncommenced="0" guid="_7a470cc2-2eee-4d5a-85bf-798c8e36e046" id="sec.82" provision.type="other" spent.amends="0"><no>82</no><heading guid="_6164d4e4-0dbb-4740-b081-0ae7967da5d9" id="sec.82-he">Restriction on substances that may be used for GHG stream storage</heading><block><txt break.before="1">A GHG permit holder can not use a substance other than a GHG stream for GHG stream storage.</txt></block></clause><clause affected.by.uncommenced="0" guid="_15aa3dd9-c0a2-4fbe-a17d-615681fb1d8d" id="sec.83" provision.type="other" spent.amends="0"><no>83</no><heading guid="_41ca9475-826e-48a7-a99d-b7df868f375a" id="sec.83-he">Restriction on GHG streams that may be used</heading><block><txt break.before="1">A GHG permit holder may use a GHG stream for GHG storage injection testing or GHG stream storage only if it consists only of carbon dioxide and—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a3f49a35-007f-4406-8def-4fdfaf7f365c" id="sec.83-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a substance incidentally derived from—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fdd60d0c-57df-44b4-98e0-23d5c50da42c" id="sec.83-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the process called carbon dioxide capture, transport and geological storage, also called carbon capture and storage; or</txt></block></li><li guid="_252807dc-86f1-4d6d-8d6f-86631be3dc41" id="sec.83-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">GHG storage; or</txt></block></li></list></block></li><li guid="_ee6810a0-4211-4d3b-9273-21e0caf92386" id="sec.83-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a detection agent prescribed under a regulation at the rate or concentration prescribed under a regulation.</txt></block></li></list><note guid="_833e853a-af15-41c3-91b8-736a0d6d09c6" id="sec.83-note" type="example"><heading guid="_a0e65d07-137c-40a1-85c6-945897c33b3b" id="sec.83-note-he">Note—</heading><block><txt break.before="1">A stream is a GHG stream only if is a stream of carbon dioxide or a substance that overwhelmingly consists of carbon dioxide. See <intref check="valid" refid="sec.12" target.guid="_a1370cf9-45f5-4d33-9ea0-422705c805d6">section 12</intref> (What is a <defterm guid="_e88ac897-b33f-4bc5-ab22-86a5cf96c9db" type="mention">GHG stream</defterm>).</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_c5a206bb-f93e-4628-9086-7aca685d5174" id="sec.84" provision.type="other" spent.amends="0"><no>84</no><heading guid="_223df8c9-1d48-49a9-a4e3-c5ca585c796e" id="sec.84-he"><legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref> authorisation required for taking or interference with water</heading><block><txt break.before="1">A GHG permit holder can not take or interfere with water as defined under the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref> unless the taking or interference is authorised under that <legref check="invalid" jurisd="QLD" type="act">Act</legref>.</txt><note guid="_c29c8de5-6498-4e1e-a009-1ab81f24b15f" id="sec.84-note" type="example"><heading guid="_5f452db9-9cd6-477e-a3cd-582681e8bc2d" id="sec.84-note-he">Note—</heading><block><txt break.before="1">For relevant <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref> provisions, see <legref check="valid" jurisd="QLD" refid="sec.19" target.doc.id="act-2000-034" target.guid="_af12c90e-feca-40d3-a70e-f57ea45e1f75" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act">sections 19</legref> and <legref check="valid" jurisd="QLD" refid="sec.808" target.doc.id="act-2000-034" target.guid="_472adce7-d425-4e58-a52d-7ff9b203f95e" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act">808</legref> of that <legref check="invalid" jurisd="QLD" type="act">Act</legref>.</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_50aa4675-55db-4de9-86ff-e395cc004df5" id="sec.85" provision.type="other" spent.amends="0"><no>85</no><heading guid="_e294d758-7fa8-4849-a1db-5ca760a4f00c" id="sec.85-he">Obligation to consult with particular owners and occupiers</heading><subclause affected.by.uncommenced="0" guid="_bdef6947-472d-47f3-af4c-84711e4dc943" id="sec.85-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A GHG permit holder must consult or use reasonable endeavours to consult with each owner and occupier of private or public land on which authorised activities for the permit are proposed to be carried out or are being carried out.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_24d6ca51-72a8-4621-8821-8fde63427565" id="sec.85-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The consultation must be about—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6808b557-7d12-4e17-bcc1-257f77f62555" id="sec.85-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">access; and</txt></block></li><li guid="_2971f952-163d-4e32-888d-fa1bfa41fa1b" id="sec.85-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the carrying out of authorised activities for the GHG permit (including, for example, crossing access land for the permit) to the extent they relate to the owners and occupiers; and</txt></block></li><li guid="_98fdfadd-f704-42d7-b130-0dbac8aa780b" id="sec.85-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the GHG permit holder’s compensation liability to the owners or occupiers.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_be770fed-a56f-47a4-8546-c4fa1375b0e3" id="sec.86" provision.type="other" spent.amends="0"><no>86</no><heading guid="_a82247c7-3313-4704-b921-a8635dfe10d7" id="sec.86-he">Annual rent</heading><subclause affected.by.uncommenced="0" guid="_1c4bbee4-2a7e-4ca4-939e-02c1c5ab70c7" id="sec.86-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A GHG permit holder must pay the State the annual rent as prescribed under a regulation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_74bd90d3-128a-4fbf-bf20-56585bf1a78f" id="sec.86-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The annual rent must be paid in the way, and on or before the day prescribed under a regulation.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a9c883a1-27aa-45de-af4f-17333c6dbc28" id="sec.87" provision.type="other" spent.amends="0"><no>87</no><heading guid="_8de3585a-1ccb-4dca-bb0f-30c388564655" id="sec.87-he">Civil penalty for non-payment of annual rent</heading><subclause affected.by.uncommenced="0" guid="_54902774-5a20-421d-961e-51c197ee609f" id="sec.87-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a GHG permit holder does not pay the annual rent as required under <intref check="valid" refid="sec.86" target.guid="_be770fed-a56f-47a4-8546-c4fa1375b0e3">section 86</intref>, the holder must also pay the State a civil penalty.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_abd18c1f-6885-4922-9763-c2502cb25878" id="sec.87-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The amount of the penalty is 15% of the rent.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b351dfc7-d2f0-48fc-95d5-47556ce80190" id="sec.87-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The penalty—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9ee9bdc5-a853-4741-9218-b840691f8930" id="sec.87-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must be paid on the day after the last day for payment of the rent; and</txt></block></li><li guid="_cdcdc7ba-0ef1-4ecd-bbcc-326ea7bb7fb4" id="sec.87-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is still payable even if the holder later pays the rent.</txt></block></li></list><note guid="_7a702a72-1d52-4159-9645-77577ccd1064" id="sec.87-ssec.3-note" type="example"><heading guid="_15eb9bbd-d8fb-4a7a-a62d-78e74967d87c" id="sec.87-ssec.3-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.372" target.guid="_cdf19c9f-040c-4850-bb53-64da3212970f">section 372</intref> (Interest on amounts owing to the State).</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3c6794cc-e8b1-482a-ac2f-0d99e818dcc1" id="sec.88" provision.type="other" spent.amends="0"><no>88</no><heading guid="_29a77233-c1f0-4544-99eb-4aba68289f8d" id="sec.88-he">Requirement to have work program</heading><block><txt break.before="1">The holder of a GHG permit must have a work program for the permit.</txt></block></clause><clause affected.by.uncommenced="0" guid="_fc14f0f1-63b0-4624-b747-67f337fa3490" id="sec.89" provision.type="other" spent.amends="0"><no>89</no><heading guid="_0bf17818-4687-413b-926e-bd8b63c81046" id="sec.89-he">Compliance with GHG storage exploration activities in work program</heading><block><txt break.before="1">A GHG permit holder must carry out the GHG storage exploration activities proposed in the permit’s work program.</txt></block></clause><clause affected.by.uncommenced="0" guid="_a9b257bd-7406-43be-91f1-5bae9a4d0574" id="sec.90" provision.type="other" spent.amends="0"><no>90</no><heading guid="_0c5b0d4c-1b43-448c-a39d-1a91ccc73b18" id="sec.90-he">Penalty relinquishment if work program not finished within extended period</heading><subclause affected.by.uncommenced="0" guid="_50210d0c-6c79-4868-af7e-6723c3d3b960" id="sec.90-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5bd02ef7-47da-4a93-9b60-7aa528190de4" id="sec.90-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">under <intref check="valid" refid="ch.2-pt.4" target.guid="_53fb6f4f-0594-47f9-8ba9-bcbacb27f25f">part 4</intref>, <intref check="valid" refid="ch.2-pt.4-div.6" target.guid="_04d6f661-a1b6-4c21-8726-2050886bee6a">division 6</intref>, the period of the work program for a GHG permit has been extended; and</txt></block></li><li guid="_995fd99f-753f-4beb-9547-03396e977fef" id="sec.90-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the work program is not finished on or before the day on which the extended period ends;</txt></block></li></list></block><block><txt break.before="1">its holder must relinquish a part of the original sub-blocks of the GHG permit that the Minister is satisfied corresponds to the amount of the work under the work program that was not finished.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9a460a7a-3f87-40e7-a43d-0a622bcd17bc" id="sec.90-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The holder must give the chief executive written notice of the relinquishment within 20 business days after the end of the extended period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_70c7e69f-c4d0-49b7-8c10-9d22c9dae737" id="sec.90-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the holder does not comply with <intref check="valid" refid="sec.90-ssec.2" target.guid="_9a460a7a-3f87-40e7-a43d-0a622bcd17bc">subsection (2)</intref>, the Minister may take action under <intref check="valid" refid="sec.379" target.guid="_7bb5ce56-1401-4239-84f9-bb0e4d600312">section 379</intref><intref check="valid" refid="sec.379-ssec.1" target.guid="_1114e42f-311c-4d6a-b9fe-732194611d29">(1)</intref><intref check="valid" refid="sec.379-ssec.1-para1.b" target.guid="_359a447f-cac5-4925-9810-2b57b9ac1c00">(b)</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_fe8c5e9a-9b3a-4f53-bfaf-10b3c837ba1f" id="sec.91" provision.type="other" spent.amends="0"><no>91</no><heading guid="_541e5938-22f3-4c00-ac4d-ddb0bae0235a" id="sec.91-he">Obligation to give proposed later work program</heading><subclause affected.by.uncommenced="0" guid="_c3245f13-9a58-4a8c-88c7-725b9b64f2e3" id="sec.91-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section imposes an obligation on a GHG permit holder to give the Minister a proposed later work program for the permit.</txt><note guid="_87271390-7653-4f77-afc8-1093d458374e" id="sec.91-ssec.1-note" type="example"><heading guid="_b4e05fa3-132d-48b2-8b49-5bd7ff8e55a2" id="sec.91-ssec.1-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_019d87d5-2ab2-4ddb-beb5-642b4e01484e" id="sec.91-ssec.1-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">For approval of the proposed program, see <intref check="valid" refid="ch.2-pt.4" target.guid="_53fb6f4f-0594-47f9-8ba9-bcbacb27f25f">part 4</intref>, <intref check="valid" refid="ch.2-pt.4-div.5" target.guid="_f7cf9157-c2f2-4479-9b47-1c020758039c">division 5</intref>.</txt></block></li><li guid="_23c5380c-9b39-4251-be94-224cb06a9516" id="sec.91-ssec.1-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">If the holder wishes to renew the GHG permit, a proposed later work program must be included in the renewal application. See <intref check="valid" refid="sec.94" target.guid="_fa4e3509-e99a-4589-bd57-78c7fa0b9725">section 94</intref><intref check="valid" refid="sec.94-ssec.1" target.guid="_0dbc0bd9-4c9c-4bba-88f0-45a6f7e3219b">(1)</intref>.</txt></block></li></list></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_057ed9cf-6cac-442a-927c-eab7ff8aa7cb" id="sec.91-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The obligation is complied with only if the proposed later work program—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_587265a6-a04e-4a73-becb-ca9dc7d6e558" id="sec.91-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">complies with the later work program requirements; and</txt></block></li><li guid="_ac52fa7c-39b6-48b7-974b-fe0c52e2d3a0" id="sec.91-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is accompanied by the relevant fee.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a71c1c78-6358-4cad-975d-38dac11c1739" id="sec.91-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A proposed later work program must be given to the Minister at least 40 but no more than 100 business days before the end of the program period for the current work program for the GHG permit (the <defterm guid="_6c22c267-9fdb-4e17-812d-03134499f1a3" id="sec.91-def.currentworkprogramperiod" type="definition">current work program period</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_34f57e2b-cd47-4129-b821-ea38ccb4bdf7" id="sec.91-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, if before the end of the current work program period a decision is made to refuse to approve a proposed later work program given under <intref check="valid" refid="sec.91-ssec.3" target.guid="_a71c1c78-6358-4cad-975d-38dac11c1739">subsection (3)</intref>, the holder may within the period give another proposed later work program.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ca984580-e73d-4e30-b3b6-8e9270bb5f74" id="sec.91-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the holder does not give the Minister any proposed later work program before the end of the current work program period or if <intref check="valid" refid="sec.91-ssec.4" target.guid="_34f57e2b-cd47-4129-b821-ea38ccb4bdf7">subsection (4)</intref> applies and the holder has not given the Minister another proposed later work program within the current work program period—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b0e2d0a8-f70e-4b73-b05f-5991598dc84c" id="sec.91-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the Minister must give the holder a notice requiring the holder to give the Minister a proposed later work program for the GHG permit within 40 business days after the giving of the notice; and</txt></block></li><li guid="_a70197e3-0463-421b-a1b8-b867a037ddb4" id="sec.91-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder must comply with the requirement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0749e2f3-dc28-44e4-9ab2-e361b5d200b1" id="sec.91-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_65b6e559-e230-45f8-8b3c-12195e540ec6" id="sec.91-ssec.6-def.relevantfee_"><txt break.before="1"><defterm guid="_a4aaa8ed-e3f8-43b8-9b02-4814b267df4e" id="sec.91-ssec.6-def.relevantfee" type="definition">relevant fee</defterm>, for the giving of the proposed program, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e7e790ba-b0d8-478b-98c3-29f75f442f0b" id="sec.91-ssec.6-def.relevantfee-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the proposed program is given within the time required under <intref check="valid" refid="sec.91-ssec.3" target.guid="_a71c1c78-6358-4cad-975d-38dac11c1739">subsection (3)</intref>—the fee prescribed under a regulation; or</txt></block></li><li guid="_8e4de8fb-7827-47c9-ad7a-8856c3d9d0b7" id="sec.91-ssec.6-def.relevantfee-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the proposed program is given after the time required under <intref check="valid" refid="sec.91-ssec.3" target.guid="_a71c1c78-6358-4cad-975d-38dac11c1739">subsection (3)</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1a7a885a-a294-4828-8ded-e111a7c26276" id="sec.91-ssec.6-def.relevantfee-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">if it is given under <intref check="valid" refid="sec.91-ssec.4" target.guid="_34f57e2b-cd47-4129-b821-ea38ccb4bdf7">subsection (4)</intref>—nil; or</txt></block></li><li guid="_aa96380a-57c1-4582-8d4f-0aa25c4fcfd6" id="sec.91-ssec.6-def.relevantfee-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if it is not given under <intref check="valid" refid="sec.91-ssec.4" target.guid="_34f57e2b-cd47-4129-b821-ea38ccb4bdf7">subsection (4)</intref>—an amount that is 10 times the prescribed fee.</txt></block></li></list></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_57bfa95a-8f11-4366-a053-1bf502930495" id="sec.92" provision.type="other" spent.amends="0"><no>92</no><heading guid="_9a298bd5-99d9-4382-8743-3c258dbc9b34" id="sec.92-he">Consequence of failure to comply with notice to give proposed later work program</heading><subclause affected.by.uncommenced="0" guid="_682596b8-8461-4126-8201-fa841a18f02d" id="sec.92-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a GHG permit holder does not comply with a requirement under <intref check="valid" refid="sec.91" target.guid="_fe8c5e9a-9b3a-4f53-bfaf-10b3c837ba1f">section 91</intref><intref check="valid" refid="sec.91-ssec.5" target.guid="_ca984580-e73d-4e30-b3b6-8e9270bb5f74">(5)</intref><intref check="valid" refid="sec.91-ssec.5-para1.a" target.guid="_b0e2d0a8-f70e-4b73-b05f-5991598dc84c">(a)</intref>, the permit is cancelled.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d7de543a-e2b9-4f7b-b2dc-5f58c8f46bef" id="sec.92-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the cancellation does not take effect until the Minister gives the holder a notice stating that the GHG permit has been cancelled because of the operation of <intref check="valid" refid="sec.92-ssec.1" target.guid="_682596b8-8461-4126-8201-fa841a18f02d">subsection (1)</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_cc2691bd-6895-47ba-800b-e1df3385ebf6" id="sec.92A" provision.type="other" spent.amends="0"><no>92A </no><heading guid="_3bf06cb4-cbd3-4c8e-8e8f-977391c012c0" id="sec.92A-he">Power to impose or amend condition if changed holder of GHG permit</heading><subclause affected.by.uncommenced="0" guid="_eafd0a66-bfe7-4039-8d62-566f89d66676" id="sec.92A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if 1 of the following changes happens—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b33bd916-3c72-4aaf-ab50-c422c8507947" id="sec.92A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an entity starts or stops controlling the holder of a GHG permit under the Corporations Act, section 50AA; </txt></block></li><li guid="_5b99597e-f468-48fa-a76b-3aed2b6a03d5" id="sec.92A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder of a GHG permit starts or stops being a subsidiary of a corporation under the Corporations Act, section 46.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_79114c25-d488-4cfe-bd68-af42a0ccdec8" id="sec.92A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister may consider whether, after the change, the holder of the GHG permit has the financial and technical resources to comply with the conditions of the GHG permit.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f7d98bda-2102-44a9-bf7e-f19a4f490152" id="sec.92A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the Minister considers the holder of the GHG permit may not have the financial and technical resources to comply with conditions of the GHG permit, the Minister may impose another condition on, or amend a condition of, the GHG permit.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b1b30c5c-0928-4583-8521-44b25077601c" id="sec.92A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the Minister believes a change mentioned in subsection (1) may have happened, the Minister may require the holder of the GHG permit to give the Minister information or a document about whether or not the change has happened.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_14f25060-eddf-46d8-9fd0-5ef8d48a4f9b" id="sec.92A-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Before deciding to impose another condition on, or amend a condition of, the GHG permit under subsection (3), the Minister may require the holder of the GHG permit to give the Minister information or a document the Minister requires to make the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_cbc0e45b-3561-4081-943e-352ee4a244e9" id="sec.92A-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">A requirement under subsection (4) or (5) must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2c914926-1f72-4238-a7d1-baff2d1bd544" id="sec.92A-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be made by notice given to the holder; and</txt></block></li><li guid="_cd4e29bf-cbec-4b21-8ff9-fb8fefd7639a" id="sec.92A-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state a period of at least 10 business days within which the holder must comply with the requirement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9f5333de-c675-4c9e-95f5-6e0bcda01e73" id="sec.92A-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">Before deciding to impose another condition on, or amend a condition of, the GHG permit under subsection (3), the Minister must give the holder of the permit a notice stating—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bf530ffe-c267-45a4-8754-abfdddb25d11" id="sec.92A-ssec.7-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the proposed decision; and</txt></block></li><li guid="_d64fb65b-ba95-4e83-a8e7-91255e39b07f" id="sec.92A-ssec.7-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the reasons for the proposed decision; and</txt></block></li><li guid="_e9eacc13-0187-46ce-b4a9-7f06417d1a87" id="sec.92A-ssec.7-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that the holder may, within 10 business days after the notice is given, make submissions to the Minister about the proposed decision.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_14082832-abb5-4ce8-87b4-c1a2a1452cf7" id="sec.92A-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">The Minister may extend the period mentioned in subsection (6)(b) or (7)(c) by notice given to the holder of the GHG permit.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c34b530e-9b71-425d-a847-7a3a2c0b6e60" id="sec.92A-ssec.9" provision.type="other"><no>(9)</no><block><txt break.before="0">In deciding whether to impose another condition on, or amend a condition of, the GHG permit under subsection (3), the Minister—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9552ecee-88e7-4c29-984a-b575bb3f43ce" id="sec.92A-ssec.9-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must consider information or a document, if any, given under subsection (6)(b) or (7)(c); and</txt></block></li><li guid="_ad348f5e-a525-498c-9b7c-cc87b96de286" id="sec.92A-ssec.9-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">may consider any other matter the Minister considers relevant.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0e301e01-e219-46d8-8929-6aa46bef97f6" id="sec.92A-ssec.10" provision.type="other"><no>(10)</no><block><txt break.before="0">If the Minister decides to impose another condition on, or amend a condition of, the GHG permit under subsection (3), the Minister must, as soon as practicable after making the decision, give the holder a notice stating the decision and the reasons for the decision.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_a1db5918-7781-495f-9dce-adfe1aca422f" id="ch.2-pt.6"><no>Part 6</no><heading guid="_b3d440db-2242-4154-8d3d-1f4a2305d9e5" id="ch.2-pt.6-he">Renewals</heading><clause affected.by.uncommenced="0" guid="_08606d29-78c5-4703-8d88-8e8348fd1e3b" id="sec.93" provision.type="other" spent.amends="0"><no>93</no><heading guid="_4bfb6d5c-6f93-46ce-8407-12255ef8c964" id="sec.93-he">Conditions for renewal application</heading><subclause affected.by.uncommenced="0" guid="_e0c97ced-9b53-4638-9ef0-3bcdf4c62714" id="sec.93-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A GHG permit holder may apply to renew the permit only if none of the following is outstanding—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cec50dcf-c11a-4ce1-be1e-6c5f86ca14f3" id="sec.93-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">annual rent for the GHG permit;</txt></block></li><li guid="_cc8b6a1d-6df7-4a2f-a361-78b76e3c1dd3" id="sec.93-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a civil penalty under <intref check="valid" refid="sec.87" target.guid="_a9c883a1-27aa-45de-af4f-17333c6dbc28">section 87</intref> for non-payment of annual rent;</txt></block></li><li guid="_a8217e1f-54fd-4ea6-82c0-27921d43ea38" id="sec.93-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">security required for the GHG permit, as required under <intref check="valid" refid="sec.271" target.guid="_189844e5-1f2b-472b-a0aa-286d65029d9a">section 271</intref>;</txt></block></li><li guid="_3171a147-57fa-44c3-a7c6-89bb1a71a6d7" id="sec.93-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">interest payable under <intref check="valid" refid="sec.372" target.guid="_cdf19c9f-040c-4850-bb53-64da3212970f">section 372</intref> on annual rent or a civil penalty.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c8556e50-06f6-4a53-bff1-a7fcc30328d6" id="sec.93-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Also, the application can not be made—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_73d8cbc7-7048-4714-9c2a-06ab7858b881" id="sec.93-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">more than 60 business days before the end of the GHG permit’s term; or</txt></block></li><li guid="_98c96fdd-7518-47dc-956a-8296870a00ad" id="sec.93-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">after the GHG permit has ended.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_fa4e3509-e99a-4589-bd57-78c7fa0b9725" id="sec.94" provision.type="other" spent.amends="0"><no>94</no><heading guid="_fd3674ee-4d13-44c1-8b85-d6cfb32f9556" id="sec.94-he">Requirements for making application</heading><subclause affected.by.uncommenced="0" guid="_0dbc0bd9-4c9c-4bba-88f0-45a6f7e3219b" id="sec.94-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The application must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4f75db37-44d1-4de7-90a6-8db55fd46b1f" id="sec.94-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be made to the Minister in the approved form; and</txt></block></li><li guid="_bd14b266-7043-433a-b58e-16a93383c306" id="sec.94-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">include a statement about how and when the applicant proposes to consult with and keep informed each owner and occupier of private or public land on which authorised activities for the renewed GHG permit are or are likely to be carried out; and</txt></block></li><li guid="_8f695bcf-bc18-4798-a1e6-698fb27d27bd" id="sec.94-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">include a proposed later work program for the renewed GHG permit; and</txt></block></li><li guid="_af4b1cb4-7f4b-4183-9ad4-c4ff44a9ee6a" id="sec.94-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">be accompanied by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_61e4bda7-0a16-4479-89a6-bb7692a8dc9c" id="sec.94-ssec.1-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the application fee prescribed under a regulation; and</txt></block></li><li guid="_5c127711-4335-4d86-96db-15ee26e6e622" id="sec.94-ssec.1-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the application is made less than 20 business days before end of the GHG permit’s term—an amount that is 10 times the application fee.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9fac27ed-bab8-4e89-b723-18c5337abf3b" id="sec.94-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The proposed work program must comply with the later work program requirements.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c9e8465d-9281-45e0-8784-3f3783a65591" id="sec.95" provision.type="other" spent.amends="0"><no>95</no><heading guid="_811e0fdd-62b9-45f0-8366-838ee3eadf5d" id="sec.95-he">Continuing effect of GHG permit for renewal application</heading><subclause affected.by.uncommenced="0" guid="_a5e34452-21be-4885-8fe1-086ea0ee49cb" id="sec.95-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if before the application is decided the GHG permit’s term ends.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3e266e51-e8d4-45ab-82b2-e54b1bb6f3b8" id="sec.95-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite the ending of the term, the GHG permit continues in force until the earlier of the following to happen—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cd3bedf4-1b82-42d8-ae19-83f372545170" id="sec.95-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the start of any renewed term of the GHG permit;</txt></block></li><li guid="_46284b1e-3a26-4eed-a4cd-2f277c3198fc" id="sec.95-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a refusal of the application takes effect;</txt></block></li><li guid="_4e3a2b7b-4882-45a5-adbe-23431acd5dc1" id="sec.95-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the application is withdrawn;</txt></block></li><li guid="_8e4eb0fc-842d-435e-aacd-5497fee3446e" id="sec.95-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the GHG permit is cancelled under this Act.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_61e3ebaf-a5ca-4dd5-bc28-ccc31f183b15" id="sec.95-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, if the applicant has applied for a declaration of a potential storage area for the GHG permit, it continues in force until the declaration application is decided but only for the area of the proposed GHG potential storage area applied for.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b4d6068e-3903-4e0b-9198-a7e7f41726b2" id="sec.95-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the GHG permit is continued in force under <intref check="valid" refid="sec.95-ssec.3" target.guid="_61e3ebaf-a5ca-4dd5-bc28-ccc31f183b15">subsection (3)</intref>, the evaluation program included in the declaration application is taken to be the work program for the permit.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_53ccda06-886a-41f0-a614-62ed90465438" id="sec.95-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the GHG permit is renewed, <intref check="valid" refid="sec.95-ssec.2" target.guid="_3e266e51-e8d4-45ab-82b2-e54b1bb6f3b8">subsections (2)</intref> and <intref check="valid" refid="sec.95-ssec.3" target.guid="_61e3ebaf-a5ca-4dd5-bc28-ccc31f183b15">(3)</intref> are taken never to have applied for the period from the end of the term of the GHG permit being renewed as stated in that permit.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_14839d85-340a-4bb0-ad78-df2191f855cf" id="sec.96" provision.type="other" spent.amends="0"><no>96</no><heading guid="_d81bf402-f100-4573-b535-a79a9503e259" id="sec.96-he">Deciding application</heading><subclause affected.by.uncommenced="0" guid="_a44e734c-01af-4d0d-a796-16a7ddb845a0" id="sec.96-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may grant or refuse the renewal.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_40f6e64f-374c-4dd0-9feb-5aae78f191d0" id="sec.96-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_487d340c-a496-4a60-b184-194f07bf0678" id="sec.96-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before deciding to grant the renewal, the Minister must decide whether to approve the applicant’s proposed later work program for the renewed GHG permit; and</txt></block></li><li guid="_5a3f8c19-f348-4f98-86cc-3a0b4aab7612" id="sec.96-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the renewal can not be granted unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5dae71e5-b4ec-428c-8863-b176ab1eb7ef" id="sec.96-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the proposed program has been approved; and</txt></block></li><li guid="_eda8bc0f-708b-4630-ba63-f19b3a68498d" id="sec.96-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the applicant satisfies the capability criteria; and</txt></block></li><li guid="_94873424-30ae-4c43-9dbe-9393d8a7fff3" id="sec.96-ssec.2-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the Minister is satisfied the applicant—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_333d1bf2-3e73-4ece-a193-c5e34a2b3448" id="sec.96-ssec.2-para1.b-para2.iii-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">continues to satisfy any special criteria that applied for deciding the application for the GHG permit being renewed; and</txt></block></li><li guid="_4eaa0d28-b0aa-429f-90dc-a0fd72de5614" id="sec.96-ssec.2-para1.b-para2.iii-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">has substantially complied with the GHG permit being renewed; and</txt></block></li></list></block></li><li guid="_e565cb26-cbab-4531-bb94-65112bb54c37" id="sec.96-ssec.2-para1.b-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">a relevant environmental authority has been issued.</txt></block></li></list></block></li></list><note guid="_f452bf24-9103-4994-9162-d6c6f5dacf9d" id="sec.96-ssec.2-note" type="example"><heading guid="_34c03fcf-73eb-47a3-8743-7301e06ef486" id="sec.96-ssec.2-note-he">Note—</heading><block><txt break.before="1">If the application relates to acquired land, see also <intref check="valid" refid="sec.369C" target.guid="_5d318eda-c04e-41c4-927c-5bfccbc8d0f8">section 369C</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_0cad4070-8506-4149-bd44-66c065f4af95" id="sec.96-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, if the applicant has been given a notice under <intref check="valid" refid="sec.107" target.guid="_5bbc34d2-02ef-4e7f-902f-3df1f918603c">section 107</intref> to apply for a GHG lease, the application must not be decided until the issue of whether a GHG lease will be granted is decided.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ee92a811-09cf-4f92-b770-954a761e69f2" id="sec.96-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0"><intref check="valid" refid="sec.96-ssec.3" target.guid="_0cad4070-8506-4149-bd44-66c065f4af95">Subsection (3)</intref> does not limit the power under <intref check="valid" refid="sec.108" target.guid="_7a6892cf-7f8e-44b6-9262-a79ddf5c1f11">section 108</intref> to take a proposed action as stated in the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5acdb853-73e1-4dcd-a5ff-6e811fafba1d" id="sec.96-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The Minister may as a condition of deciding to grant the application require the applicant to do all or any of the following within a stated reasonable period—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7a001651-da48-42fa-adb4-a1e46143207a" id="sec.96-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">pay the annual rent for the first year of the renewed GHG permit;</txt></block></li><li guid="_a6845810-ce12-4ab0-93af-fe4beafbbfc0" id="sec.96-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give under <intref check="valid" refid="sec.271" target.guid="_189844e5-1f2b-472b-a0aa-286d65029d9a">section 271</intref>, security for the renewed GHG permit.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_115636a0-e673-4e89-9db0-62a0ca16d790" id="sec.96-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">If the applicant does not comply with the requirement, the application may be refused.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_131d4a53-8bdd-4245-8975-392494a912da" id="sec.97" provision.type="other" spent.amends="0"><no>97</no><heading guid="_a2b24294-69d9-40fc-be6e-ad7ff7492ec6" id="sec.97-he">Provisions and term of renewed GHG permit</heading><subclause affected.by.uncommenced="0" guid="_5cd3c56a-1ecb-4523-9e38-71b4173ae4b5" id="sec.97-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Subject to this section, <intref check="valid" refid="sec.41" target.guid="_34765540-0a08-4786-9832-e30b382f5132">section 41</intref> applies to the renewed GHG permit as if it were a GHG permit granted under <intref check="valid" refid="ch.2-pt.2" target.guid="_7f976c7a-8d1f-43eb-b00e-acc633d1e46b">part 2</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fe10545c-1e23-4362-b16e-7895f2ec817e" id="sec.97-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">To remove any doubt, it is declared that the conditions of the renewed GHG permit may be different from the conditions or other provisions of the GHG permit being renewed.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_745c72fe-97ff-4838-a6cf-89ca8884cf40" id="sec.97-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The area of the renewed GHG permit must not be more than the area of the GHG permit being renewed immediately before the renewed GHG permit is to take effect.</txt><note guid="_7744c182-71f9-4296-b487-9f8b61a8b1c6" id="sec.97-ssec.3-note" type="example"><heading guid="_9c7b40e5-0961-4db1-b53e-cd2dac0142b2" id="sec.97-ssec.3-note-he">Note—</heading><block><txt break.before="1">See, however, <intref check="valid" refid="sec.369C" target.guid="_5d318eda-c04e-41c4-927c-5bfccbc8d0f8">section 369C</intref> in relation to acquired land that was previously in the area of the GHG permit being renewed.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_2403ce66-775c-4876-ad8c-b588ba0744e5" id="sec.97-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The first relinquishment day for the renewed GHG permit must not be later than 4 years after the day the renewed GHG permit is to take effect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9706faf8-3b59-4712-9c54-1e91db951916" id="sec.97-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the renewed GHG permit is decided before the end of the term of the GHG permit being renewed as stated in that GHG permit (the <defterm guid="_0929f73e-5c6a-48e2-9ec7-12563a2866e9" id="sec.97-def.previousterm" type="definition">previous term</defterm>), the term of the renewed GHG permit is taken to start from the end of the previous term.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4e6954fe-9e18-4449-a9c5-eb678e58baf5" id="sec.97-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">If the renewed GHG permit is decided after the previous term, the term of the renewed GHG permit starts immediately after the end of the previous term, but—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3a6a2735-2776-4933-8e61-e822647bb2a0" id="sec.97-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the conditions of the renewed GHG permit do not start until its holder is given notice of them; and</txt></block></li><li guid="_9743e0f6-ba2d-4543-9ad7-c2beef3b52c2" id="sec.97-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">until the notice is given, the conditions of the GHG permit being renewed apply to the renewed GHG permit as if they were its conditions.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e9a63950-2b44-4e99-8b43-198812fcef41" id="sec.97-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">The term of the renewed GHG permit must not end more than 12 years from when it originally took effect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5ef2317b-954e-4fd8-83ee-66f97d342b52" id="sec.97-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">However, if any part of the renewed GHG permit’s area is a potential storage area, the term of the renewed GHG permit for that part may be for a longer period that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_40b46d93-0891-4da6-9408-13e672024792" id="sec.97-ssec.8-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">ends no later than when the declaration ends; and</txt></block></li><li guid="_1bb03324-d0e4-4d84-968f-c1636a9b4712" id="sec.97-ssec.8-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is no more than the last term of the GHG permit being renewed.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d27a30fd-b354-408b-89c6-982cad813b19" id="sec.97-ssec.9" provision.type="other"><no>(9)</no><block><txt break.before="0">To remove any doubt, it is declared that <intref check="valid" refid="sec.97-ssec.8" target.guid="_5ef2317b-954e-4fd8-83ee-66f97d342b52">subsection (8)</intref><intref check="valid" refid="sec.97-ssec.8-para1.b" target.guid="_1bb03324-d0e4-4d84-968f-c1636a9b4712">(b)</intref> does not prevent a renewal of the renewed GHG permit.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_46370421-ae5c-4202-ad99-8e2e231da444" id="sec.98" provision.type="other" spent.amends="0"><no>98</no><heading guid="_c74b2181-d157-41d9-a03b-5f3e4fdf3f73" id="sec.98-he">Criteria for decisions</heading><block><txt break.before="1">In deciding whether to grant the renewal or deciding the provisions of the renewed GHG permit the Minister must consider—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1cbef7af-3b77-4bd9-90e2-ef6b6e2ace44" id="sec.98-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the work program criteria; and</txt></block></li><li guid="_43a41102-ec59-450c-a0c1-b2effece069e" id="sec.98-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether the applicant continues to satisfy the capability criteria and any special criteria.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_f73f7da4-2345-4b46-9ea8-da1ea8333fe9" id="sec.99" provision.type="other" spent.amends="0"><no>99</no><heading guid="_9dddaf70-6c88-4024-8e84-7bfc28a0da38" id="sec.99-he">Information notice about refusal</heading><block><txt break.before="1">If the Minister decides to refuse the application, the Minister must give the applicant an information notice about the decision.</txt></block></clause><clause affected.by.uncommenced="0" guid="_92397103-abe4-476e-8311-736b212d0493" id="sec.100" provision.type="other" spent.amends="0"><no>100</no><heading guid="_02d3ec2b-12f7-4a85-ab28-ef57fee25797" id="sec.100-he">When refusal takes effect</heading><block><txt break.before="1">A refusal of the application does not take effect until end of the appeal period for the decision to refuse.</txt></block></clause></part><part affected.by.uncommenced="0" guid="_7344d8aa-7e2d-4d1b-bbde-25128652130f" id="ch.2-pt.7"><no>Part 7</no><heading guid="_c204b796-1d8f-4da1-8b78-cbbf960a2595" id="ch.2-pt.7-he">Potential storage areas</heading><clause affected.by.uncommenced="0" guid="_6a690df3-ec7e-4566-87d7-f66f703321f1" id="sec.101" provision.type="other" spent.amends="0"><no>101</no><heading guid="_d1a46dad-4138-4caa-b761-f0a89f9f7177" id="sec.101-he">Applying for potential storage area</heading><subclause affected.by.uncommenced="0" guid="_f6ca737c-14fe-4732-b180-f0b52cb312df" id="sec.101-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The holder of a GHG permit may apply for a declaration by the Minister that all or a stated part of its area is a potential storage area for the permit.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_158b7c8e-13e0-42d3-94c9-89f070a3a2f3" id="sec.101-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application must be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_28926dba-450b-4fc3-884f-cfe4817bcbbd" id="sec.101-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">made to the Minister in the approved form; and</txt></block></li><li guid="_318c735f-5378-436e-9ba7-c697842b0c35" id="sec.101-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">accompanied by the fee prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e421cbb3-9e2f-45c9-a9f2-d4236d2f1dbb" id="sec.101-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The application may be made—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e4aa7b3d-3e80-45ae-8e3d-500bd4399074" id="sec.101-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for more than 1 part of the GHG permit’s area; and</txt></block></li><li guid="_bafa4f27-19b8-49d5-9bef-07d65a1772ae" id="sec.101-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">even if another part of the GHG permit’s area is already a potential storage area.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_31c8e98d-a43f-40ec-8732-6feb0a6b0c7b" id="sec.101-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The application must include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_39f07df9-f9fa-42a9-b2f0-d28bd283b350" id="sec.101-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a report for or that includes the proposed potential storage area that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_586da212-c54d-4799-8bca-9d106d06f02f" id="sec.101-ssec.4-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">meets the requirements under <intref check="valid" refid="sec.246" target.guid="_12eaec3a-cdbd-47ca-9eec-f66281033392">section 246</intref> for a GHG storage viability report; and</txt></block></li><li guid="_ad687298-2e9c-4dcf-8717-f4662392dacb" id="sec.101-ssec.4-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">is still relevant to the circumstances of the proposed potential storage area; and</txt></block></li></list></block></li><li guid="_14782b93-1a40-4966-ab12-a7df5dfb65b2" id="sec.101-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an evaluation program for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f82d28ae-0761-4ddb-8937-390eb20e59ee" id="sec.101-ssec.4-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">potential GHG stream storage in the proposed potential storage area; and</txt></block></li><li guid="_e34ca665-9c72-45e8-8116-39dde16c9382" id="sec.101-ssec.4-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">market opportunities for potential GHG stream storage.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_221ebf34-60ff-4f09-a3bb-106ea4304a5d" id="sec.101-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.101-ssec.4" target.guid="_31c8e98d-a43f-40ec-8732-6feb0a6b0c7b">subsection (4)</intref><intref check="valid" refid="sec.101-ssec.4-para1.a" target.guid="_39f07df9-f9fa-42a9-b2f0-d28bd283b350">(a)</intref> does not apply if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5a632a35-4f24-4b66-9458-57da55137a7f" id="sec.101-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a GHG storage viability report or an independent viability assessment relates to or includes the proposed potential storage area; and</txt></block></li><li guid="_7ebf38a1-a7a4-481f-9798-5bd51ef1f9fe" id="sec.101-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the report or assessment is still relevant to the circumstances of the proposed potential storage area.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_fe02bb19-e4c6-4a70-83c5-95744af34884" id="sec.102" provision.type="other" spent.amends="0"><no>102</no><heading guid="_254c49a5-eeb1-4f43-91a5-a8014e2fe4c3" id="sec.102-he">Deciding potential storage area application</heading><subclause affected.by.uncommenced="0" guid="_26f04167-bb5b-429a-9b8e-6ca5cafe7acf" id="sec.102-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may declare an area the subject of the application to be a potential storage area only if satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_141c7fc3-b00c-43d1-853e-be6b06954fc3" id="sec.102-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the area is no more than is needed to cover the maximum extent of a GHG stream storage site identified in the report; and</txt></block></li><li guid="_508ffc20-d92c-434f-88d0-6c47e96fbeb8" id="sec.102-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the applicant does not and will not soon have an available GHG stream for GHG stream storage in the area to be declared, but a GHG stream is likely to become available for GHG stream storage in the area.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9032f297-3bb9-475a-8f26-2c63d40037d7" id="sec.102-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The area declared must form a single parcel of land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_84233aaf-b04d-4378-a512-253ef91e089c" id="sec.102-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In deciding the application, regard must be had to whether the conditions of the relevant GHG permit have been substantially complied with.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_74dfb4d9-b39b-45cd-a137-3de40f3e2ca4" id="sec.102-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">To remove any doubt, it is declared that the declaration may be made even if the GHG permit has been continued in force under <intref check="valid" refid="sec.95" target.guid="_c9e8465d-9281-45e0-8784-3f3783a65591">section 95</intref> or <intref check="valid" refid="sec.116" target.guid="_3109b454-7b41-4717-b7eb-18317e22a80e">116</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_61400cb1-d4dd-490d-861f-5ae5480967ab" id="sec.102-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the Minister decides to refuse the application, the Minister must give the applicant an information notice about the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_dbbdbdde-3f47-4d3f-9951-fbba4fe159be" id="sec.103" provision.type="other" spent.amends="0"><no>103</no><heading guid="_77f4b42f-5aa9-47a1-893d-4af70d49ab50" id="sec.103-he">Inclusion of evaluation program in work program</heading><subclause affected.by.uncommenced="0" guid="_06158826-b904-4e45-a390-36c30184b916" id="sec.103-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the declaration is made, the evaluation program that accompanied the application is taken to be an additional part of the existing work program for the GHG permit.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3f5786ac-85ab-45d5-ad62-0bc84dc80533" id="sec.103-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If there is an inconsistency between the evaluation program and the rest of the work program, the evaluation program prevails to the extent of the inconsistency.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3804143c-ca0c-41d0-ab70-7a22a761d40a" id="sec.104" provision.type="other" spent.amends="0"><no>104</no><heading guid="_32939acb-0834-43fd-a4da-53e4d859cfad" id="sec.104-he">Term of declaration</heading><subclause affected.by.uncommenced="0" guid="_01959f56-9173-4a54-b11b-d1542602d314" id="sec.104-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A declaration of a potential storage area continues in force for the period stated in the declaration.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a82d5499-916e-4c7a-9548-7b513e57709a" id="sec.104-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The period can not be more than 10 years.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_aa36f9d0-09d6-4dac-a1c2-d384179d6cdf" id="sec.104-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In deciding a shorter period the Minister must consider—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4a830b29-f422-41b0-8330-69c972ab598b" id="sec.104-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">when any discovery of a GHG stream storage site was made; and</txt></block></li><li guid="_105cbf4f-8b47-402a-9dbf-d37a9f45c369" id="sec.104-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any GHG storage viability report or independent viability assessment for or that includes the proposed potential storage area.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c8989c5d-0bb0-47e9-9481-0e6c548c021f" id="sec.104-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Despite <intref check="valid" refid="sec.104-ssec.1" target.guid="_01959f56-9173-4a54-b11b-d1542602d314">subsection (1)</intref>, the declaration ceases if the GHG permit holder gives the chief executive a notice stating that the holder no longer wishes the area to be a potential storage area.</txt><note guid="_f0f79ef4-3682-46a7-85a4-92825172c700" id="sec.104-ssec.4-note" type="example"><heading guid="_88f50656-2f89-472c-b88c-e67d1010b9a3" id="sec.104-ssec.4-note-he">Note—</heading><block><txt break.before="1">For other relevant provisions about giving a document to the chief executive, see <intref check="valid" refid="sec.411" target.guid="_1563d9ac-bd31-449e-842a-931b0e660c2b">section 411</intref>.</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f4e1a3bf-2539-4f51-9fa3-da4df24c9e36" id="sec.105" provision.type="other" spent.amends="0"><no>105</no><heading guid="_cd75a078-d02a-4f89-8df2-1cc761ad19e1" id="sec.105-he">Potential storage area still part of GHG permit</heading><block><txt break.before="1">A declaration of a potential storage area does not change the land the subject of the declaration from being—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_700671fb-edc0-403a-9d1e-f9897800d502" id="sec.105-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">part of the area of the GHG permit the subject of the application for the declaration; and</txt></block></li><li guid="_f98a600c-c9cf-4919-b232-22bee37f3eed" id="sec.105-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">subject to the GHG permit.</txt></block></li></list></block></clause></part><part affected.by.uncommenced="0" guid="_fdda4d49-be0b-4812-8c45-8fb6416ce1bc" id="ch.2-pt.8"><no>Part 8</no><heading guid="_66c595d0-bc1e-4135-9b07-8f11fc5a3be6" id="ch.2-pt.8-he">Provisions to facilitate transition to GHG lease</heading><clause affected.by.uncommenced="0" guid="_cf82a860-d436-4f6a-94d2-b2726d8414f1" id="sec.106" provision.type="other" spent.amends="0"><no>106</no><heading guid="_a22fe4ca-a417-4f9c-a071-9d798568094c" id="sec.106-he">Application of <intref check="valid" refid="ch.2-pt.8" target.guid="_fdda4d49-be0b-4812-8c45-8fb6416ce1bc">pt 8</intref></heading><block><txt break.before="1">This part applies if the Minister reasonably considers the holder of a GHG permit should apply for a GHG lease for all or part of the permit’s area because a GHG stream is or soon will be available for GHG stream storage in the area.</txt></block></clause><clause affected.by.uncommenced="0" guid="_5bbc34d2-02ef-4e7f-902f-3df1f918603c" id="sec.107" provision.type="other" spent.amends="0"><no>107</no><heading guid="_576d2b7e-0601-4be2-9c6d-483bb7b18818" id="sec.107-he">Ministerial direction to apply for GHG lease</heading><subclause affected.by.uncommenced="0" guid="_f7c08cc6-9d30-4b2d-9928-9726196eb573" id="sec.107-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may give the GHG permit holder a notice stating each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5971d8ac-5a25-4119-bc28-4ca7c41c6920" id="sec.107-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that the Minister proposes to do either of the following, (the <defterm guid="_d5ddbf78-e455-408f-bfb0-3523f241700e" id="sec.107-ssec.1-def.proposedaction" type="definition">proposed action</defterm>) unless the holder has made an appropriate lease application—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d9aa4f4b-3426-4107-8cb7-dbc8b392e97d" id="sec.107-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">excise a stated area from the area of the GHG permit;</txt></block></li><li guid="_0ae8068d-c08f-46e4-bfef-be5ae2620edc" id="sec.107-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">cancel the GHG permit;</txt></block></li></list></block></li><li guid="_29ba6c59-cb43-404d-b655-fdb7bdb8f64e" id="sec.107-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the grounds for the proposed action;</txt></block></li><li guid="_3c1025bd-31eb-4d2b-a512-eacbe76fe47b" id="sec.107-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the facts and circumstances forming the basis for the grounds;</txt></block></li><li guid="_02c14552-761e-440e-b015-15842c2b1076" id="sec.107-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">that the holder may within a stated period, make submissions to the Minister about why the holder should not make a GHG lease application for the stated area.</txt><note guid="_8c0c3257-8e64-401f-90e3-dc2eb647ab4f" id="sec.107-ssec.1-para1.d-note" type="example"><heading guid="_e855e3ca-07e5-4ae6-9b9b-a7c136f3ce6c" id="sec.107-ssec.1-para1.d-note-he">Note—</heading><block><txt break.before="1">For other relevant provisions about making a submission, see <intref check="valid" refid="sec.411" target.guid="_1563d9ac-bd31-449e-842a-931b0e660c2b">section 411</intref>.</txt></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_40224ba2-b80b-4ffc-9e6c-548c8ff8ed4c" id="sec.107-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The stated period must be reasonable but must not be more than 6 months.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3c4680eb-63f8-4e12-b1d7-636a5f25b351" id="sec.107-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_48992fd6-b5e6-4c7f-a62e-293b960cf2cf" id="sec.107-ssec.3-def.appropriateleaseapplication_"><txt break.before="1"><defterm guid="_10af1e55-8245-49c9-8184-3fc026fef44b" id="sec.107-ssec.3-def.appropriateleaseapplication" type="definition">appropriate lease application</defterm> means a GHG lease application for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_620f4c09-fe80-49cf-866b-b912c85a4628" id="sec.107-ssec.3-def.appropriateleaseapplication-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the stated area or an area that is substantially the same as the stated area; or</txt></block></li><li guid="_c417946a-8bc7-4bd3-a1e8-32975859b39e" id="sec.107-ssec.3-def.appropriateleaseapplication-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">another area the Minister reasonably considers will effectively allow the holder to carry out authorised activities for a GHG lease in relation to the stated area.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7a6892cf-7f8e-44b6-9262-a79ddf5c1f11" id="sec.108" provision.type="other" spent.amends="0"><no>108</no><heading guid="_aebf8268-f1c4-41ab-b5f5-0db5d40086cc" id="sec.108-he">Taking proposed action</heading><subclause affected.by.uncommenced="0" guid="_3626b196-11f2-4783-af71-c9036153ae30" id="sec.108-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Proposed action under <intref check="valid" refid="sec.107" target.guid="_5bbc34d2-02ef-4e7f-902f-3df1f918603c">section 107</intref> may be taken only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f83532a0-d86f-4563-a602-b4b87c8561d5" id="sec.108-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the stated period under that section has ended; and</txt></block></li><li guid="_e1ff6e40-05e2-436c-8608-874b6382c2de" id="sec.108-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">either—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f2adef60-7037-471e-bb95-981f593f1931" id="sec.108-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the holder has not made an appropriate GHG lease application under that section; or</txt></block></li><li guid="_242788a6-796f-4be7-89bb-316ca98fd296" id="sec.108-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">any appropriate lease application under that section made by the holder has been refused; and</txt></block></li></list></block></li><li guid="_ffeac1cb-5478-4196-ad90-0e1b485ab188" id="sec.108-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the Minister has considered any submissions made by the holder within the period.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8c6f708e-7328-40f7-80f6-8e96733fde3e" id="sec.108-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The decision does not take effect until the holder is given an information notice about the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_02c39d12-d60c-4901-ad5b-530134fa705a" id="sec.108-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A refusal of the application takes effect at end of the appeal period for the decision to refuse.</txt></block></subclause></clause></part></chapter><chapter affected.by.uncommenced="0" guid="_4c6bae05-4d64-4dbf-a4f3-a2736db63437" id="ch.3"><no>Chapter 3</no><heading guid="_57da49c1-050c-46f2-b9bb-85b7a77364ea" id="ch.3-he">GHG injection and storage leases</heading><note guid="_f439255b-7ba9-4046-90c7-515c5281a722" id="ch.3-note" type="example"><heading guid="_2a8b3ca4-a22c-4b45-94d9-14760601ccec" id="ch.3-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_51f5e034-7ed0-4d88-b5c7-03b1de63dcff" id="ch.3-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">For the requirement to have a GHG tenure, see <intref check="valid" refid="sec.386" target.guid="_47dc29d5-fcf5-4fca-81ba-0ab5605dca08">section 386</intref>.</txt></block></li><li guid="_0ad53394-fe4b-483f-a3ec-19ed86b1f49c" id="ch.3-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0"><intref check="valid" refid="ch.4" target.guid="_faefc638-342e-43b0-a5ed-6ae7a9f9a690">Chapter 4</intref> imposes requirements for and restrictions on the granting of, and restrictions on authorised activities that may be carried out under, particular GHG tenures. See <intref check="valid" refid="sec.182" target.guid="_c7817b2c-1608-4582-b68b-f5e5344a3b0f">section 182</intref>.</txt></block></li></list></block></note><part affected.by.uncommenced="0" guid="_8bc97f5c-bb0e-42b6-adf5-161382950c8e" id="ch.3-pt.1"><no>Part 1</no><heading guid="_319f0a38-218f-443d-add6-a5e0db6e330f" id="ch.3-pt.1-he">Key authorised activities</heading><clause affected.by.uncommenced="0" guid="_64406916-5c84-41a9-8880-86919bd2f111" id="sec.109" provision.type="other" spent.amends="0"><no>109</no><heading guid="_b5821434-2be1-447f-b187-057d84d9512b" id="sec.109-he">Operation of <intref check="valid" refid="ch.3-pt.1" target.guid="_8bc97f5c-bb0e-42b6-adf5-161382950c8e">pt 1</intref></heading><block><txt break.before="1">This part provides for the key authorised activities for a GHG lease.</txt><note guid="_6b33fe07-cfa6-404b-bebe-8959f31f2abf" id="sec.109-note" type="example"><heading guid="_7856f663-5456-4da2-b8e3-83d3fa6fdd00" id="sec.109-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_80946630-2e4c-439a-9b96-8fb4e55efa7f" id="sec.109-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">For other authorised activities, see the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-2014-047" target.guid="_78e7ee55-dcff-4087-b0b9-13497e839af3" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">chapter 3</legref>, <legref check="valid" jurisd="QLD" refid="ch.3-pt.2" target.doc.id="act-2014-047" target.guid="_adcc85c6-c389-49c8-b998-858dca31ac1f" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">part 2</legref>, <legref check="invalid" jurisd="QLD" type="act">division 4</legref> (Access to private land outside authorised area) and <legref check="invalid" jurisd="QLD" type="act">part 12</legref> (General provisions for conditions and authorised activities).</txt></block></li><li guid="_e2ed4d40-61ff-4826-aa8f-d65c8f9cff19" id="sec.109-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">For general restrictions on authorised activities, their relationship with owners’ and occupiers’ rights and who may carry out authorised activities for a GHG authority holder, see <intref check="valid" refid="ch.5" target.guid="_c200371d-7276-455f-ab31-e74d811368e1">chapter 5</intref>, <intref check="valid" refid="ch.5-pt.12" target.guid="_1522b152-04be-4326-95f6-52b27402695b">part 12</intref>, <intref check="valid" refid="ch.5-pt.12-div.3" target.guid="_52e9113b-f38f-4392-a865-e39e2e512683">division 3</intref>.</txt></block></li><li guid="_f0967289-58dc-42bd-b982-39f50c12e3cc" id="sec.109-note-para1.3" provision.type="other"><no>3</no><block><txt break.before="0">The carrying out of particular activities on particular land in the GHG lease’s area may not be authorised following the taking of the land under a resumption law. See <intref check="valid" refid="sec.369B" target.guid="_d9b1575e-7c2a-404c-9b3e-19f30c1ce1e6">section 369B</intref>.</txt></block></li></list></block></note></block></clause><clause affected.by.uncommenced="0" guid="_a6cba85b-4a2c-4920-8a76-423098751576" id="sec.110" provision.type="other" spent.amends="0"><no>110</no><heading guid="_b5fc64f7-dd00-4747-8eb3-f89e97a0b512" id="sec.110-he">Principal authorised activities</heading><block><txt break.before="1">The GHG lease holder may carry out the following activities in the lease’s area—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_49018929-50fa-41df-bca0-1b8a05ce22af" id="sec.110-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">GHG storage exploration;</txt></block></li><li guid="_ca413c1e-28ba-4afe-8ab9-6984cdb7bd12" id="sec.110-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">evaluating the feasibility of GHG stream storage, including for example, by GHG storage injection testing;</txt></block></li><li guid="_fa3eb7ae-d148-4c8f-a37f-9895a2b38a20" id="sec.110-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">compressing or otherwise processing a GHG stream for GHG stream storage;</txt></block></li><li guid="_f4b4b494-f5d5-4d99-ba2a-7d08fa35447c" id="sec.110-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">GHG stream storage;</txt></block></li><li guid="_e1b37815-201d-40d5-a7c2-b1f1d755eeb3" id="sec.110-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">monitoring and verifying the behaviour of the GHG streams;</txt></block></li><li guid="_376ba56f-e51c-491a-8e1d-1079482d01f9" id="sec.110-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">plugging and abandoning, or otherwise remediating, a bore or well the holder reasonably believes is a legacy borehole, and rehabilitating the surrounding area in compliance with the requirements prescribed under a regulation.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_c90aba78-f99d-4d2b-b22e-91c152678ee0" id="sec.111" provision.type="other" spent.amends="0"><no>111</no><heading guid="_f9de45bc-de7f-435c-b953-5f4963da9b10" id="sec.111-he">GHG stream pipeline and water pipeline construction and operation</heading><subclause affected.by.uncommenced="0" guid="_45a1fdcf-dbc6-4819-a41c-ce5d10b4e98e" id="sec.111-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The GHG lease holder may construct and operate GHG stream pipelines and water pipelines in the lease’s area.</txt><note guid="_de4a7866-a05e-4a54-ac36-0682566aa4f1" id="sec.111-ssec.1-note" type="example"><heading guid="_2f3a7f98-19e5-496e-8f7f-c4318557008f" id="sec.111-ssec.1-note-he">Note—</heading><block><txt break.before="1">The <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref> provides for the granting of licences that will allow the investigation and surveying for, and the construction and operation of, GHG stream pipelines outside the area of a GHG lease. See <legref check="valid" jurisd="QLD" refid="sec.16" target.doc.id="act-2004-025" target.guid="_78b3e1f4-de3e-4047-b212-fc9d0c03967e" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">sections 16</legref>, <legref check="valid" jurisd="QLD" refid="sec.394" target.doc.id="act-2004-025" target.guid="_5e798ca2-bc66-4101-9259-745026f9e34c" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">394</legref> and <legref check="valid" jurisd="QLD" refid="sec.402" target.doc.id="act-2004-025" target.guid="_162af7e9-4ec5-415a-92d5-f4bf364cfe65" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">402</legref> of that Act.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_bc3e03c3-65de-41ac-811c-325320c6dfb2" id="sec.111-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if a GHG stream pipeline or water pipeline extends beyond the area of the GHG lease, <intref check="valid" refid="sec.111-ssec.1" target.guid="_45a1fdcf-dbc6-4819-a41c-ce5d10b4e98e">subsection (1)</intref> applies only if the pipeline is completely within—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_930b19bb-e3d3-4ebf-b21d-c029307a2cd0" id="sec.111-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the GHG lease’s area; and</txt></block></li><li guid="_ba9c1308-5042-4b27-acbd-f6e9aec1a476" id="sec.111-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the area of 1 or more other GHG leases that are—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_47341fed-f019-4b69-97ce-2ac54e32f23a" id="sec.111-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">contiguous to the GHG lease; and</txt></block></li><li guid="_33d02f29-f64f-4515-8b71-6a2bf800b7f7" id="sec.111-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">also held by the holder or are subject to a GHG coordination arrangement to which the holder is a party.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f3af56c6-e775-4420-bc95-fe2b997e9029" id="sec.111-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, if the pipeline is a water pipeline, the pipeline may only be operated to transport water for the carrying out of an authorised activity for the GHG lease or another GHG lease mentioned in <intref check="valid" refid="sec.111-ssec.2" target.guid="_bc3e03c3-65de-41ac-811c-325320c6dfb2">subsection (2)</intref><intref check="valid" refid="sec.111-ssec.2-para1.b" target.guid="_ba9c1308-5042-4b27-acbd-f6e9aec1a476">(b)</intref> on an area mentioned in <intref check="valid" refid="sec.111-ssec.2" target.guid="_bc3e03c3-65de-41ac-811c-325320c6dfb2">subsection (2)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fabd7ed9-b608-49b7-8f36-a9896d662b0b" id="sec.111-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0"><intref check="valid" refid="sec.111-ssec.3" target.guid="_f3af56c6-e775-4420-bc95-fe2b997e9029">Subsection (3)</intref> does not prevent the GHG lease holder from constructing or operating a water pipeline if the holder can otherwise lawfully do so.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0b4a5227-664a-4bca-8cf2-b6b45c4de317" id="sec.111-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_a1bd3b17-d08d-48b4-930d-fbe0ad205a35" id="sec.111-ssec.5-def.operate_"><txt break.before="1"><defterm guid="_8c937bc3-7cee-4253-b9eb-a4631a0538df" id="sec.111-ssec.5-def.operate" type="definition">operate</defterm>, a GHG stream pipeline, includes use, inspect, test, maintain, repair, alter, add to and replace the pipeline.</txt></definition><definition affected.by.uncommenced="0" guid="_a2095b53-c02c-499d-a764-681191869889" id="sec.111-ssec.5-def.waterpipeline_"><txt break.before="1"><defterm guid="_d7b5ac5c-d73f-4423-8bf3-0a650283d1ac" id="sec.111-ssec.5-def.waterpipeline" type="definition">water pipeline</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_48a32438-1428-4b2f-8ca9-338387f444d1" id="sec.111-ssec.5-def.waterpipeline-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a pipe or system of pipes for transporting water; and</txt></block></li><li guid="_926080d9-2ea3-4e8c-bded-abd8636782f7" id="sec.111-ssec.5-def.waterpipeline-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a thing connected to or associated with the pipeline that is necessary for its operation, including for example, a thing mentioned in the examples to <intref check="valid" refid="sec.17" target.guid="_79c2b709-2af5-487a-92e9-efe08fcd600c">section 17</intref><intref check="valid" refid="sec.17-ssec.2" target.guid="_c7e745e4-2493-47e0-9b93-bde9784574ad">(2)</intref><intref check="valid" refid="sec.17-ssec.2-para1.b" target.guid="_463fc7c4-57f7-4316-8b4e-6f159fd0bbf4">(b)</intref>.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_01d123f6-b9db-4544-8528-062bfc605df5" id="sec.112" provision.type="other" spent.amends="0"><no>112</no><heading guid="_4209d287-b03c-4d98-9e9d-d2df41723eb6" id="sec.112-he">Incidental activities</heading><subclause affected.by.uncommenced="0" guid="_e4ede61c-3b93-46c7-9afc-e41b59d8d23c" id="sec.112-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The GHG lease holder may carry out an activity (an <defterm guid="_ac8a449e-3984-4553-a0f3-0935d2089194" id="sec.112-def.incidentalactivity" type="definition">incidental activity</defterm>) in the lease’s area if carrying out the activity is reasonably necessary for or is incidental to another authorised activity for the lease.</txt><note guid="_c1cddd68-0b96-41f0-b2a3-f3476b21f89b" id="sec.112-ssec.1-note" type="example"><heading guid="_ca4bb1af-328d-4563-9323-3b1cf878fad3" id="sec.112-ssec.1-note-he">Examples of incidental activities—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_11dc7b39-d59f-4298-981e-1f7342dd8df4" id="sec.112-ssec.1-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">constructing or operating facilities, plant or works, including for example, communication systems, compressors, powerlines, pumping stations, reservoirs, roads, evaporation or storage ponds and tanks</txt></block></li><li guid="_5db99430-9b39-4cb4-87be-7505b0eeb890" id="sec.112-ssec.1-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">constructing or using temporary structures or structures of an industrial or technical nature, including for example, mobile and temporary camps</txt></block></li></list></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_cca4aabc-2efb-449c-b492-77720be92279" id="sec.112-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, constructing or using a structure other than a temporary structure, for office or residential accommodation is not an incidental activity.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_cae2c2ed-71c1-4255-b0c3-1af07107162f" id="ch.3-pt.2"><no>Part 2</no><heading guid="_f74dc751-c2bc-408a-a687-3e768ae6b7f2" id="ch.3-pt.2-he">Transition from GHG permit to GHG lease</heading><division affected.by.uncommenced="0" guid="_3ffac869-7b6b-4588-827d-4b96cdd5e978" id="ch.3-pt.2-div.1"><no>Division 1</no><heading guid="_8befb765-33f5-4d1f-a558-b86210e59bba" id="ch.3-pt.2-div.1-he">Applying for GHG lease</heading><clause affected.by.uncommenced="0" guid="_11b056f3-e113-4ec7-bcbe-5e724f6136e9" id="sec.113" provision.type="other" spent.amends="0"><no>113</no><heading guid="_b6511e04-1795-45b9-aff3-258501044485" id="sec.113-he">Who may apply</heading><subclause affected.by.uncommenced="0" guid="_4cb009bc-74ae-4812-8c49-236b2764b3e2" id="sec.113-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A GHG permit holder may apply for a GHG lease over all or part of the permit’s area.</txt><note guid="_5d9ef24c-1001-4629-864f-507d00d82c78" id="sec.113-ssec.1-note" type="example"><heading guid="_e5df6d48-f1d9-44c8-93b5-20090377ff92" id="sec.113-ssec.1-note-he">Note—</heading><block><txt break.before="1">For inclusion of acquired land that was previously in the GHG permit’s area, see <intref check="valid" refid="sec.369C" target.guid="_5d318eda-c04e-41c4-927c-5bfccbc8d0f8">section 369C</intref><intref check="valid" refid="sec.369C-ssec.3" target.guid="_59187cf4-0192-4064-a54e-c0433da91df0">(3)</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_d7a9bb94-19d7-4b0b-bd97-e3a205578e95" id="sec.113-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Also, a person other than the holder may apply for the GHG lease—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0b8fc396-f321-4f67-a4f6-15c88bfb162d" id="sec.113-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">jointly with the holder; or</txt></block></li><li guid="_503efcdf-4df7-4c43-8596-82f690877b1d" id="sec.113-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">with the holder’s consent.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3eb66c5b-5ac6-4c01-aca0-35064d3aea31" id="sec.113-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">An application under this section is a <defterm guid="_f2e76587-ee61-47e0-9fbc-4a7205f15f5b" id="sec.113-def.permitrelatedapplication" type="definition">permit-related application</defterm>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_29f95184-8d97-4f2c-b867-3c13fd23595f" id="sec.114" provision.type="other" spent.amends="0"><no>114</no><heading guid="_31280e14-3c97-41ad-81b9-7bb1f086145d" id="sec.114-he">Requirements for making permit-related application</heading><block><txt break.before="1">A permit-related application must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ffaa2424-08a0-40dc-b443-769e61c1b7b8" id="sec.114-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be made to the Minister in the approved form; and</txt></block></li><li guid="_f25cbb53-11e1-42c0-81f7-98e6880f05cf" id="sec.114-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">address the capability criteria; and</txt></block></li><li guid="_4cf067bf-7a4f-4b96-a41c-f00f2a9dd6c1" id="sec.114-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ecd5c1ff-023b-45db-bfad-d761a60ee894" id="sec.114-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a statement about how and when the applicant proposes to consult with and keep informed each owner and occupier of private or public land on which authorised activities for the proposed GHG lease are or are likely to be carried out; and</txt></block></li><li guid="_df9fce53-badc-4576-bb58-2b3d5030d846" id="sec.114-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a proposed development plan that complies with the initial development plan requirements; and</txt></block></li><li guid="_202f69e2-f893-425b-b14f-75b9bc74698f" id="sec.114-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">a statement about the extent to which the applicant has—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_17bbad34-6d28-4823-9477-42f87f32c150" id="sec.114-para1.c-para2.iii-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">the financial and technical resources to carry out authorised activities for the proposed GHG lease; and</txt></block></li><li guid="_b048d6c0-6fe1-4e45-91a9-f45f7131727c" id="sec.114-para1.c-para2.iii-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">the ability to manage GHG stream storage; and</txt></block></li></list></block></li></list></block></li><li guid="_2143746f-574e-4c82-9065-93121b6aafc5" id="sec.114-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">be accompanied by the fee prescribed under a regulation.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" change="insReplace" guid="_78f311e8-5a38-4145-996b-4e8010c76731" id="sec.115" provision.type="other" spent.amends="0"><no>115 </no><heading guid="_3ddbcf8b-894b-4249-b68c-e36a14729695" id="sec.115-he">Rejection of permit-related application if applicant disqualified</heading><subclause affected.by.uncommenced="0" guid="_43d4de82-a939-4b2a-9185-c87db0aeda63" id="sec.115-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister must reject a permit-related application for a GHG lease if the Minister decides the person making the application is disqualified under the Common Provisions Act, chapter 7 from being granted the GHG lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c001d1aa-ba29-46b5-bd44-87016bbd515b" id="sec.115-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On rejection of the application, the Minister must give the person making the application a notice about the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3109b454-7b41-4717-b7eb-18317e22a80e" id="sec.116" provision.type="other" spent.amends="0"><no>116</no><heading guid="_cd9df8cf-90b6-420d-b157-59061c0bd9ea" id="sec.116-he">Continuing effect of GHG permit for permit-related application</heading><subclause affected.by.uncommenced="0" guid="_70c04933-ac49-4811-add4-116c5c62c866" id="sec.116-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if other than for <intref check="valid" refid="sec.116-ssec.2" target.guid="_0d772732-7de4-4c55-bfb8-2e8976d4c79c">subsection (2)</intref>, the relevant GHG permit would other than by cancellation under this Act, end before the permit-related application is decided.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0d772732-7de4-4c55-bfb8-2e8976d4c79c" id="sec.116-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The GHG permit continues in force for the area the subject of the application until the earlier of the following to happen—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_77a7a95e-7f0a-4bd9-8c6c-9dfcf5ef6db0" id="sec.116-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the start of the term of the GHG lease;</txt></block></li><li guid="_11fd73f1-761b-46fa-b68f-2ced8fe23f52" id="sec.116-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a refusal of the application takes effect;</txt></block></li><li guid="_4eed8f71-7c2a-4e90-9e58-24ab32e220b1" id="sec.116-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the application is withdrawn.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_622b0d85-e777-4fe8-b73f-92f6b18a9611" id="sec.116-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Despite any ending of the program period for the current work program for the GHG permit—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4092df0a-d8f4-4371-a0cc-da233973e3f5" id="sec.116-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the GHG permit is taken to have a work program; and</txt></block></li><li guid="_db2ec0e7-ad79-424d-bec3-f89364d0aad0" id="sec.116-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder may carry out any authorised activity for the GHG permit.</txt></block></li></list></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_18714bee-7b39-4833-bd7a-993a28ba5425" id="ch.3-pt.2-div.2"><no>Division 2</no><heading guid="_a198400a-bba3-4725-a617-b016ffc35d75" id="ch.3-pt.2-div.2-he">Deciding permit-related applications</heading><clause affected.by.uncommenced="0" guid="_f47d958c-f1e6-4adc-bc6f-f1e9d5df4606" id="sec.117" provision.type="other" spent.amends="0"><no>117</no><heading guid="_d54e8c30-0d41-4228-a859-bfd8a0ed5794" id="sec.117-he">Deciding whether to grant GHG lease</heading><subclause affected.by.uncommenced="0" guid="_e90c3345-4910-4633-8359-7e7fa963f0bc" id="sec.117-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.119" target.guid="_0621952f-7c2a-40d5-bffd-f477de647b13">sections 119</intref> and <intref check="valid" refid="sec.121" target.guid="_3c437978-ad57-4dc3-93d1-8c7121871ed4">121</intref>, the Minister may grant a GHG lease applied for under a permit-related application only if the Minister is satisfied the requirements mentioned in <intref check="valid" refid="sec.118" target.guid="_caba8768-e566-46e2-9665-a52878db55fc">section 118</intref> (the <defterm guid="_fe4f99f4-2b92-4662-8dbf-4a8f43eaa749" id="sec.117-def.requirementsforgrant" type="definition">requirements for grant</defterm>) have been complied with.</txt><note guid="_a592d0eb-850b-4d7c-9b0a-637b91f87475" id="sec.117-ssec.1-note" type="example"><heading guid="_54626c52-80b8-49cc-9221-d7d5e78c178a" id="sec.117-ssec.1-note-he">Note—</heading><block><txt break.before="1">If the application relates to acquired land that was previously in the relevant GHG permit’s area, see also <intref check="valid" refid="sec.369C" target.guid="_5d318eda-c04e-41c4-927c-5bfccbc8d0f8">section 369C</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_79f25d46-5c16-46ce-9985-5f39b02c3742" id="sec.117-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application must be refused if the Minister is not satisfied any requirement for grant other than the requirement mentioned <intref check="valid" refid="sec.118" target.guid="_caba8768-e566-46e2-9665-a52878db55fc">section 118</intref><intref check="valid" refid="sec.118-ssec.1" target.guid="_acccbdb9-9ff6-4a7d-a504-8fb7489a13bb">(1)</intref><intref check="valid" refid="sec.118-ssec.1-para1.c" target.guid="_e57b46db-2585-40f6-b4b7-a32ead3c954f">(c)</intref> has been complied with.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_19304829-c4a9-4fd4-9a21-cd15ebddf888" id="sec.117-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the Minister is satisfied the requirements for grant other than the requirement mentioned <intref check="valid" refid="sec.118" target.guid="_caba8768-e566-46e2-9665-a52878db55fc">section 118</intref><intref check="valid" refid="sec.118-ssec.1" target.guid="_acccbdb9-9ff6-4a7d-a504-8fb7489a13bb">(1)</intref><intref check="valid" refid="sec.118-ssec.1-para1.c" target.guid="_e57b46db-2585-40f6-b4b7-a32ead3c954f">(c)</intref> have been complied with, the Minister may grant the GHG lease.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_caba8768-e566-46e2-9665-a52878db55fc" id="sec.118" provision.type="other" spent.amends="0"><no>118</no><heading guid="_eadb6b29-004d-42eb-b06a-a615ee0c90d8" id="sec.118-he">Requirements for grant</heading><subclause affected.by.uncommenced="0" guid="_acccbdb9-9ff6-4a7d-a504-8fb7489a13bb" id="sec.118-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The requirements for grant are each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_caf2730e-bd17-4ab8-8e38-70c8b006dbd1" id="sec.118-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the applicant is an eligible person;</txt></block></li><li guid="_c4601ea6-eecf-4938-9f13-63e03cb44334" id="sec.118-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the proposed area of the proposed GHG lease—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1b012ede-c289-414c-ba3b-0118eb8fb5f4" id="sec.118-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">is appropriate for the authorised activities proposed to be carried out; and</txt></block></li><li guid="_510abd6d-ccd5-4810-a4fb-fcda952299a7" id="sec.118-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">contains an adequately identified GHG stream storage site that is adequate for the proposed purpose of the GHG lease;</txt></block></li></list></block></li><li guid="_e57b46db-2585-40f6-b4b7-a32ead3c954f" id="sec.118-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the conditions of the relevant GHG permit have been substantially complied with;</txt></block></li><li guid="_67304b75-e9d9-4057-a192-8b7a1d56cd8c" id="sec.118-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the Minister has approved the applicant’s proposed initial development plan for the GHG lease;</txt></block></li><li guid="_bed25351-97d2-493d-8236-398f7e8ff422" id="sec.118-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">a relevant environmental authority has been issued;</txt></block></li><li guid="_484e016e-2548-4601-bb1a-c3c993158a43" id="sec.118-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">the applicant has established that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4aa13506-57fb-4e22-8ada-156166e1f207" id="sec.118-ssec.1-para1.f-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">GHG stream storage in the GHG lease’s area is or is likely to happen within 5 years after the lease is to take effect; or</txt></block></li><li guid="_66a72126-07b1-437f-a010-8542ba0dd445" id="sec.118-ssec.1-para1.f-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the applicant has entered into a contract, GHG coordination arrangement or other arrangement for GHG stream storage in the GHG lease’s area (a <defterm guid="_b79dbb00-048f-4387-8a35-2fc1f697aa9c" id="sec.118-ssec.1-para1.f-def.relevantarrangement" type="definition">relevant arrangement</defterm>);</txt></block></li></list></block></li><li guid="_d3cfb2ea-d0d8-4bfe-a1b5-9ad0f676ae83" id="sec.118-ssec.1-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">the applicant has paid the annual rent for the first year of the proposed GHG lease;</txt></block></li><li guid="_f6141910-43c9-416b-b70a-1a35ce1e7f54" id="sec.118-ssec.1-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">the applicant has given under <intref check="valid" refid="sec.271" target.guid="_189844e5-1f2b-472b-a0aa-286d65029d9a">section 271</intref>, security for the GHG lease;</txt></block></li><li guid="_9e095717-1deb-4e97-ae9d-eda13bfcc152" id="sec.118-ssec.1-para1.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the Minister is of the opinion that the applicant is capable of carrying out authorised activities for the GHG lease having regard to the applicant’s—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_55a16f8c-fefb-4e91-bcd5-e5e64bec57e3" id="sec.118-ssec.1-para1.i-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">financial and technical resources; and</txt></block></li><li guid="_02c6069d-2bf4-4804-aec5-de403d834571" id="sec.118-ssec.1-para1.i-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">ability to carry out GHG stream storage.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_de931c9c-764c-4c8f-9360-e138dc5ef263" id="sec.118-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The matters mentioned in <intref check="valid" refid="sec.118-ssec.1" target.guid="_acccbdb9-9ff6-4a7d-a504-8fb7489a13bb">subsection (1)</intref><intref check="valid" refid="sec.118-ssec.1-para1.i" target.guid="_9e095717-1deb-4e97-ae9d-eda13bfcc152">(i)</intref> are the <defterm guid="_7a3b104b-0297-40b8-96cd-e2acad63c0af" id="sec.118-def.capabilitycriteria" type="definition">capability criteria</defterm>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e4828f75-85ce-4373-b565-2cd83235c31f" id="sec.118-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A person <defterm guid="_7f0b7b22-525d-49e5-8025-a252fd438aba" id="sec.118-def.satisfies" type="definition">satisfies</defterm> the capability criteria if the Minister forms the opinion about the person mentioned in <intref check="valid" refid="sec.118-ssec.1" target.guid="_acccbdb9-9ff6-4a7d-a504-8fb7489a13bb">subsection (1)</intref><intref check="valid" refid="sec.118-ssec.1-para1.i" target.guid="_9e095717-1deb-4e97-ae9d-eda13bfcc152">(i)</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0621952f-7c2a-40d5-bffd-f477de647b13" id="sec.119" provision.type="other" spent.amends="0"><no>119</no><heading guid="_f6e94891-c864-4339-a1c1-0bc6a07d0d2c" id="sec.119-he">Exception for particular relevant arrangements</heading><block><txt break.before="1">The application may be refused if the Minister—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9fac22f4-e51f-4f67-8b19-5d6c4b8e5030" id="sec.119-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is not satisfied of the matter under <intref check="valid" refid="sec.118" target.guid="_caba8768-e566-46e2-9665-a52878db55fc">section 118</intref><intref check="valid" refid="sec.118-ssec.1" target.guid="_acccbdb9-9ff6-4a7d-a504-8fb7489a13bb">(1)</intref><intref check="valid" refid="sec.118-ssec.1-para1.f" target.guid="_484e016e-2548-4601-bb1a-c3c993158a43">(f)</intref><intref check="valid" refid="sec.118-ssec.1-para1.f-para2.i" target.guid="_4aa13506-57fb-4e22-8ada-156166e1f207">(i)</intref>; and</txt></block></li><li guid="_9e3fee2e-e576-4dcc-9160-c386649efba3" id="sec.119-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is satisfied the applicant has entered into a relevant arrangement, but the Minister reasonably believes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ccae9973-884a-42de-972b-0b61200a438d" id="sec.119-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the arrangement is not an arms-length commercial transaction; or</txt></block></li><li guid="_2c2604fd-aa45-42d0-a56b-50dbee82196c" id="sec.119-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">supply under the arrangement is unlikely to be carried out.</txt></block></li></list></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_fcda669d-b9d0-4f90-b99b-7bf477b46c2b" id="sec.120" provision.type="other" spent.amends="0"><no>120</no><heading guid="_fa79f246-b632-4ebd-ae49-b9a83458f008" id="sec.120-he">Provisions of GHG lease</heading><subclause affected.by.uncommenced="0" guid="_9b086e10-4e1a-423d-8a8d-26860b145e07" id="sec.120-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A GHG lease must state its area.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a7f744a4-6e60-49b5-b793-5316da878010" id="sec.120-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A GHG lease may also state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d81f0a86-0feb-48da-a7c7-2ea24c1e8a0a" id="sec.120-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">conditions or other provisions of the GHG lease other than conditions or provisions that are—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7b241562-a416-4501-b0ac-9c4f18fd70a7" id="sec.120-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">inconsistent with the mandatory conditions for GHG leases; or</txt></block></li><li guid="_2a32f359-44b0-4af1-8115-9483f7d53fc8" id="sec.120-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the same as or substantially the same as or inconsistent with any relevant environmental condition; and</txt></block></li></list></block></li><li guid="_2da679fe-64b3-4f5a-9d81-5bf695c4e86c" id="sec.120-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a day for the GHG lease to take effect; and</txt></block></li><li guid="_49f0e504-d5c2-44d3-bd62-b569b2ec98e4" id="sec.120-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a day by which GHG stream storage under the GHG lease is to start (the <defterm guid="_4dc164b9-bf32-44a2-84c7-abd35a00d9ce" id="sec.120-ssec.2-def.storagecommencementday" type="definition">storage commencement day</defterm>).</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d6913f3c-8389-4e4a-87b9-415552801ce1" id="sec.120-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the provisions of the GHG lease may exclude or restrict the carrying out of an authorised activity for the lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d10ca09b-f5a7-4517-a792-98eff33741a7" id="sec.120-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The day of effect must not be before the day the GHG lease is granted.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_859224a6-1ea8-48a2-ac1f-6565c7f99e1b" id="sec.120-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If no day of effect is decided, the GHG lease takes effect on the day it is granted.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1e8aedf7-8bc2-4162-b5a4-5adca1c682d9" id="sec.120-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The storage commencement day may be more than 5 years after the day of effect only if the Minister is satisfied the holder has entered into a relevant arrangement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6d52e409-2318-4ff9-91ce-3a1b82384296" id="sec.120-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">In deciding the provisions of the GHG lease the Minister must consider the development plan criteria and capability criteria.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b4178bab-7003-46ac-82d1-b39f539273c5" id="sec.120-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">This section applies subject to <intref check="valid" refid="sec.121" target.guid="_3c437978-ad57-4dc3-93d1-8c7121871ed4">section 121</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3c437978-ad57-4dc3-93d1-8c7121871ed4" id="sec.121" provision.type="other" spent.amends="0"><no>121</no><heading guid="_3ad9e39f-cb03-4a82-9819-c410c712d607" id="sec.121-he">Provisions about grant and conditions of GHG lease for coordinated project</heading><subclause affected.by.uncommenced="0" guid="_54b887cc-103f-4b4f-9d44-0a921bd05aa5" id="sec.121-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a proposed GHG lease is for a coordinated project.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2b806598-2422-4c6f-8bd0-a10f691c1799" id="sec.121-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister must not grant the GHG lease until the Minister has been given the Coordinator-General’s report for the project.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4cb1e335-48bb-4d7b-a6a4-a84ec698eae7" id="sec.121-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Any Coordinator-General’s conditions for the GHG lease must be stated in the lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fb1ab93f-671f-44db-830f-061b87fdafce" id="sec.121-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Any other condition of the GHG lease stated under <intref check="valid" refid="sec.120" target.guid="_fcda669d-b9d0-4f90-b99b-7bf477b46c2b">section 120</intref> must not be inconsistent with the Coordinator-General’s conditions.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0f530894-bc97-48a3-82c5-8c126733df12" id="sec.121-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If a mandatory condition for GHG leases conflicts with any of the Coordinator-General’s conditions, the mandatory condition prevails to the extent of the inconsistency.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_68e3dc9e-6e92-436c-90a3-c9a940427021" id="sec.121-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_e4a7cb77-7a80-47b4-a559-48bcb41f6877" id="sec.121-ssec.6-def.CoordinatorGeneralsconditions_"><txt break.before="1"><defterm guid="_e056dade-4374-40e1-be68-cafc00b7364d" id="sec.121-ssec.6-def.CoordinatorGeneralsconditions" type="definition">Coordinator-General’s conditions</defterm>, for the proposed GHG lease, means the conditions for the lease stated in the Coordinator-General’s report for the coordinated project.</txt></definition><definition affected.by.uncommenced="0" guid="_9a226fa9-a5bd-461f-a5dd-0b2dce176490" id="sec.121-ssec.6-def.CoordinatorGeneralsreport_"><txt break.before="1"><defterm guid="_36ed8d17-a6e2-4af8-b8e4-5897688ebd21" id="sec.121-ssec.6-def.CoordinatorGeneralsreport" type="definition">Coordinator-General’s report</defterm>, for a coordinated project, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_27d1a740-2686-4373-a30f-28600d6b90dc" id="sec.121-ssec.6-def.CoordinatorGeneralsreport-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if an EIS was prepared for the project—the Coordinator-General’s report for the EIS prepared under the <legref check="valid" jurisd="QLD" target.doc.id="act-1971-055" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" type="act"><name emphasis="no">State Development Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.34D" target.doc.id="act-1971-055" target.guid="_7a674e1f-2d3e-498f-b466-f0fd7f8d978f" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" type="act">section 34D</legref>; or</txt></block></li><li guid="_85cc07d5-a4eb-4b83-904c-66e76aa05370" id="sec.121-ssec.6-def.CoordinatorGeneralsreport-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if an IAR was prepared for the project—the Coordinator-General’s report for the IAR prepared under the <legref check="valid" jurisd="QLD" target.doc.id="act-1971-055" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" type="act"><name emphasis="no">State Development Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.34L" target.doc.id="act-1971-055" target.guid="_4dadba86-8e70-4d9a-b09a-60197ec7e69c" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" type="act">section 34L</legref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_e892a45c-97a8-4aa6-83ac-ce87ce172aa4" id="sec.121-ssec.6-def.EIS_"><txt break.before="1"><defterm guid="_16fd2fd7-6994-47c8-9fd2-a3ae9f2e116e" id="sec.121-ssec.6-def.EIS" type="definition">EIS</defterm> means an EIS under the <legref check="valid" jurisd="QLD" target.doc.id="act-1971-055" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" type="act"><name emphasis="no">State Development Act</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_af085317-e141-439a-9956-0df24f56d247" id="sec.121-ssec.6-def.IAR_"><txt break.before="1"><defterm guid="_17c74a03-6c7b-4fc0-b629-68ec2f954b0b" id="sec.121-ssec.6-def.IAR" type="definition">IAR</defterm> means an IAR under the <legref check="valid" jurisd="QLD" target.doc.id="act-1971-055" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" type="act"><name emphasis="no">State Development Act</name></legref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7b810d7c-0912-4d26-bd0a-86f13c492843" id="sec.122" provision.type="other" spent.amends="0"><no>122</no><heading guid="_cdad196a-70fa-4021-a774-87139bcd3dc6" id="sec.122-he">Information notice about refusal</heading><block><txt break.before="1">If the Minister decides to refuse the application, the Minister must give the applicant an information notice about the decision.</txt></block></clause><clause affected.by.uncommenced="0" guid="_6acc30ec-2af2-4f31-a0ee-79c2b8416787" id="sec.123" provision.type="other" spent.amends="0"><no>123</no><heading guid="_3d350eeb-7adf-44b6-b5a4-06ebf4ce3007" id="sec.123-he">When refusal takes effect</heading><block><txt break.before="1">A refusal of the application does not take effect until the end of the appeal period for the decision to refuse.</txt></block></clause></division></part><part affected.by.uncommenced="0" guid="_5bc6ff2c-a6de-4945-b5ae-e6bee6baef5e" id="ch.3-pt.3"><no>Part 3</no><heading guid="_d21358c3-7715-4812-b9e8-c46b0a646fa4" id="ch.3-pt.3-he">Obtaining GHG lease by competitive tender</heading><division affected.by.uncommenced="0" guid="_ea5a932b-a0b7-4388-8812-91395996dce0" id="ch.3-pt.3-div.1"><no>Division 1</no><heading guid="_6b129adf-774d-48ea-b787-557c494f7b64" id="ch.3-pt.3-div.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_9ef54f0f-0f8a-4b09-a97a-80bfe0d0050f" id="sec.124" provision.type="other" spent.amends="0"><no>124</no><heading guid="_6c1c525c-781e-4fd2-8abd-f732a5772750" id="sec.124-he">Operation of <intref check="valid" refid="ch.3-pt.3" target.guid="_5bc6ff2c-a6de-4945-b5ae-e6bee6baef5e">pt 3</intref></heading><subclause affected.by.uncommenced="0" guid="_867a3e2c-2d65-4486-8ad0-44101403818c" id="sec.124-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This part provides for a process for the granting of GHG leases by competitive tender.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_df20b8d6-fd88-4a52-b622-33b1724d7905" id="sec.124-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">To remove any doubt, it is declared that a GHG lease can only be granted under this part or <intref check="valid" refid="ch.3-pt.2" target.guid="_cae2c2ed-71c1-4255-b0c3-1af07107162f">part 2</intref>.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_2cd2174a-449f-4173-b0c0-cf6e9f0491f7" id="ch.3-pt.3-div.2"><no>Division 2</no><heading guid="_47083f6c-ed20-4f01-8d51-15c83945410e" id="ch.3-pt.3-div.2-he">Calls for tenders</heading><clause affected.by.uncommenced="0" guid="_18a4cbb6-460e-491a-af4e-66cfb9a26f90" id="sec.125" provision.type="other" spent.amends="0"><no>125</no><heading guid="_174fcb98-cd31-47a9-ae42-5d0d5357cf66" id="sec.125-he">Call for tenders</heading><subclause affected.by.uncommenced="0" guid="_d1805e99-a8fa-462a-9801-80ff7fa234b9" id="sec.125-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may by gazette notice invite tenders for a GHG lease (a <defterm guid="_a2487f19-8e73-48c0-abd2-b7d5056a15fb" id="sec.125-def.callfortenders" type="definition">call for tenders</defterm>) for land other than unavailable land for a GHG lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ee55496a-de9b-4c62-9842-25dd11aae18b" id="sec.125-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The call must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fbdbe538-b891-404b-b1b1-c966dc8c6b44" id="sec.125-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the day and time by which tenders in response to it must be made (the <defterm guid="_4386c45b-4675-4faf-a3cb-e55adb71f07a" id="sec.125-ssec.2-def.closingtime" type="definition">closing time</defterm> for the call); and</txt></block></li><li guid="_3db4a473-9afb-4944-acee-de2d9383b8c2" id="sec.125-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any criteria (<defterm guid="_53222733-5180-40bd-b62a-71a2ccc0a3e7" id="sec.125-ssec.2-def.specialcriteria" type="definition">special criteria</defterm>) other than the development plan criteria and capability criteria proposed to be used to decide whether to grant the GHG lease or to decide its provisions.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6b136024-4185-4aa6-a505-e27a58b7c424" id="sec.125-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The call may state other relevant matters, including for example, matters relevant to the development plan, capability or special criteria.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0ee7ba94-d144-455e-b1ff-5dd5cbe7ee0d" id="sec.126" provision.type="other" spent.amends="0"><no>126</no><heading guid="_dc4ec440-e3c9-4f1b-a338-8a4376b8deeb" id="sec.126-he">Right to tender</heading><subclause affected.by.uncommenced="0" guid="_b0b5a040-3e3d-4344-a774-676a92692253" id="sec.126-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An eligible person may tender for a proposed GHG lease the subject of a call for tenders.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2c3416dc-b79d-4626-879d-bf83e302f47b" id="sec.126-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, a tender—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3ee1e91d-a9bb-4c33-a202-e90999847e79" id="sec.126-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must comply with the requirements under <intref check="valid" refid="sec.114" target.guid="_29f95184-8d97-4f2c-b867-3c13fd23595f">section 114</intref> for making a permit-related application; and</txt></block></li><li guid="_79a4927b-fa56-40d4-88ff-277bbb00993d" id="sec.126-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">must be made to the Minister in the approved form; and</txt></block></li><li guid="_0254c461-9c82-4f08-af41-e4919d9cc76a" id="sec.126-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">can not be made—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_39c28af8-0507-409d-b6c0-feb6e393fe72" id="sec.126-ssec.2-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">after the closing time for the call; or</txt></block></li><li guid="_81cfa780-b6cc-4bd2-85eb-54f8af694b27" id="sec.126-ssec.2-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">for only part of the area of the proposed GHG lease.</txt></block></li></list></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_57338a78-cd22-41fb-80e6-a3353512b026" id="sec.126A" provision.type="other" spent.amends="0"><no>126A </no><heading guid="_380ddeb6-edfa-4b68-8e81-a2f37fc4752d" id="sec.126A-he">Rejection of tender if tenderer disqualified</heading><subclause affected.by.uncommenced="0" guid="_9505b020-99b4-4312-9c39-7fa5468da3f4" id="sec.126A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister must reject a tender for a proposed GHG lease if the Minister decides the tenderer is disqualified under the Common Provisions Act, chapter 7 from being granted the GHG lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_aae9b02d-80df-4e4e-ac79-3bdad71cbfb5" id="sec.126A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On rejection of the tender, the Minister must give the tenderer a notice about the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_89296ba1-2a7c-4c7e-bac8-571ba01d8da3" id="sec.127" provision.type="other" spent.amends="0"><no>127</no><heading guid="_b99dbeec-2722-4430-b3e0-6c6c49feb16c" id="sec.127-he">Right to terminate call for tenders</heading><subclause affected.by.uncommenced="0" guid="_c4a949e3-ae78-4865-8009-af3bb5959ec3" id="sec.127-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may by gazette notice terminate a call for tenders at any time before deciding whether to grant a GHG lease to a person who has made a tender in response to the call.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_22e37189-0c9e-4363-bdc1-85271ac32bc9" id="sec.127-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">All tenders in response to the call lapse when the call is terminated.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_771512d5-b2de-4236-a7b1-0f3e7815751a" id="sec.127-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">No amount, whether by way of compensation, reimbursement or otherwise, is payable by the State to any person for or in connection with the termination.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_e29f161c-96dd-467d-8e0d-0db38d62db6a" id="ch.3-pt.3-div.3"><no>Division 3</no><heading guid="_588cf237-2867-455d-8233-719b6ef0553a" id="ch.3-pt.3-div.3-he">Deciding tenders</heading><clause affected.by.uncommenced="0" guid="_80d80385-c7b3-4368-8b35-0d14a912b252" id="sec.128" provision.type="other" spent.amends="0"><no>128</no><heading guid="_ae8d1660-219e-4da2-bf6a-fb82895a96a1" id="sec.128-he">Process for deciding tenders</heading><block><txt break.before="1">Subject to <intref check="valid" refid="sec.132" target.guid="_86134f10-94fb-43c7-9ddf-f27fc48a5282">section 132</intref>, any process the Minister considers appropriate may be used to decide a call for tenders, including for example, by a process appointing a preferred tenderer on the tenders made in response to the call.</txt></block></clause><clause affected.by.uncommenced="0" guid="_c747a14c-7a2d-4d0c-8531-350029ac41b9" id="sec.129" provision.type="other" spent.amends="0"><no>129</no><heading guid="_8138ef4b-9b49-4a30-9533-8e5a360852fc" id="sec.129-he">Provisions for preferred tenderers</heading><subclause affected.by.uncommenced="0" guid="_eb8fe89e-c169-4d4b-abb6-4f2a354945c4" id="sec.129-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may require a preferred tenderer for the call for tenders to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9745b804-7ab3-4b14-8d60-e764127e3d3a" id="sec.129-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">pay any amounts necessarily incurred or to be incurred to enable the GHG lease to be granted; and</txt></block></li><li guid="_65248b11-1856-414e-a89d-73e045623756" id="sec.129-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to do all or any of the following within a stated reasonable period—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f4283918-dd6a-4e78-949c-b2e53add59be" id="sec.129-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">pay the annual rent for the first year of the GHG lease;</txt></block></li><li guid="_7736dfed-b848-42d7-aa75-d3dd5a85b747" id="sec.129-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">give security for the GHG lease as required under <intref check="valid" refid="sec.271" target.guid="_189844e5-1f2b-472b-a0aa-286d65029d9a">section 271</intref>.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b5dc50d9-8939-4e96-8392-6e2906c07729" id="sec.129-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If a preferred tenderer does not—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_75cccc72-11a9-477f-ae5d-85120e12b0a4" id="sec.129-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">comply with a requirement under <intref check="valid" refid="sec.129-ssec.1" target.guid="_eb8fe89e-c169-4d4b-abb6-4f2a354945c4">subsection (1)</intref>; or</txt></block></li><li guid="_3fe33338-e25a-4041-8602-80b4c8e16394" id="sec.129-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">do all things reasonably necessary to allow a GHG lease to be granted to the tenderer;</txt></block></li></list></block><block><txt break.before="1">the Minister may appoint another tenderer to be the preferred tenderer.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_15ecfe70-1880-44a0-ab4b-14e663a921dc" id="sec.130" provision.type="other" spent.amends="0"><no>130</no><heading guid="_0a4c0aac-f7e3-4cf5-8ad7-f88cf7677015" id="sec.130-he">Deciding whether to grant GHG lease</heading><subclause affected.by.uncommenced="0" guid="_d1a8f0b9-bd76-40b7-8b5d-ccd818af09c1" id="sec.130-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may, after the closing time for the call for tenders—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_88088019-b982-4b47-87e1-93434cfbcd8c" id="sec.130-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">grant a GHG lease to 1 tenderer; or</txt></block></li><li guid="_9bb9ff20-36c8-46e5-8cf0-c817865b5e3d" id="sec.130-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">refuse to grant any GHG lease.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_08428d44-12bc-461f-aedc-283ab89e26c5" id="sec.130-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9bb91308-866b-4d1b-84cb-869d798163d2" id="sec.130-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before deciding to grant the GHG lease, the Minister must decide whether to approve the applicant’s proposed initial development plan for the GHG lease; and</txt></block></li><li guid="_cc4e187b-e5b6-40ef-896a-490c212d3e90" id="sec.130-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Minister can not grant the GHG lease unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8621c462-7c79-4171-bcd7-7f911471f40a" id="sec.130-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the tenderer is an eligible person; and</txt></block></li><li guid="_16ce33be-3e61-4bd2-9da7-327f97799924" id="sec.130-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the proposed plan has been approved; and</txt></block></li><li guid="_ace10b99-7cc9-49aa-a46e-17c6ab8aae6f" id="sec.130-ssec.2-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the Minister is satisfied the requirements for grant other than the requirement mentioned in <intref check="valid" refid="sec.118" target.guid="_caba8768-e566-46e2-9665-a52878db55fc">section 118</intref><intref check="valid" refid="sec.118-ssec.1" target.guid="_acccbdb9-9ff6-4a7d-a504-8fb7489a13bb">(1)</intref><intref check="valid" refid="sec.118-ssec.1-para1.c" target.guid="_e57b46db-2585-40f6-b4b7-a32ead3c954f">(c)</intref> have been complied with; and</txt></block></li><li guid="_0259e479-2cfa-4fc9-9beb-275f24802b39" id="sec.130-ssec.2-para1.b-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">a relevant environmental authority has been issued.</txt></block></li></list></block><note guid="_a007d459-ea4d-4914-bfbb-345ef82e341a" id="sec.130-ssec.2-para1.b-note" type="example"><heading guid="_198806e5-c56e-48e6-9f18-88e3a1f946e5" id="sec.130-ssec.2-para1.b-note-he">Note—</heading><block><txt break.before="1">If a tender relates to acquired land, see also <intref check="valid" refid="sec.369C" target.guid="_5d318eda-c04e-41c4-927c-5bfccbc8d0f8">section 369C</intref>.</txt></block></note></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b5797dad-5572-466f-a1fb-24dbb1a28dd1" id="sec.130-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">This section applies subject to <intref check="valid" refid="sec.121" target.guid="_3c437978-ad57-4dc3-93d1-8c7121871ed4">section 121</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8661e1c7-0e86-4730-8862-bce351db8801" id="sec.131" provision.type="other" spent.amends="0"><no>131</no><heading guid="_4478ab74-e505-40e8-92c6-619ee7fcba8c" id="sec.131-he">Provisions of GHG lease</heading><block><txt break.before="1"><intref check="valid" refid="sec.120" target.guid="_fcda669d-b9d0-4f90-b99b-7bf477b46c2b">Sections 120</intref> and <intref check="valid" refid="sec.121" target.guid="_3c437978-ad57-4dc3-93d1-8c7121871ed4">121</intref> apply to a GHG lease granted under this part as if the tender for the lease was a permit-related application.</txt></block></clause><clause affected.by.uncommenced="0" guid="_86134f10-94fb-43c7-9ddf-f27fc48a5282" id="sec.132" provision.type="other" spent.amends="0"><no>132</no><heading guid="_910cbed0-e327-4a83-8ac0-57649721a530" id="sec.132-he">Criteria for decisions</heading><subclause affected.by.uncommenced="0" guid="_51ea856f-26e5-47d6-a3a0-4ebab10673ee" id="sec.132-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">In considering whether to grant a GHG lease or its provisions the Minister must consider the development plan criteria, capability criteria and any special criteria.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ce53d998-5d84-4df9-81f5-9c2a658af9ce" id="sec.132-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister may give the weight to each of the development plan, capability and special criteria that the Minister considers appropriate in the circumstances.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e046b087-1b99-42a7-bbc0-aba8514eca0b" id="sec.133" provision.type="other" spent.amends="0"><no>133</no><heading guid="_a7c5a4c3-6d68-46e8-9a77-1dfcc3317cdc" id="sec.133-he">Notice to unsuccessful tenderers</heading><block><txt break.before="1">After a call for tenders has been decided, the Minister must give each tenderer not granted the GHG lease notice of the decision.</txt></block></clause></division></part><part affected.by.uncommenced="0" guid="_6dccba7d-8cff-4ff0-8e78-29725873e28a" id="ch.3-pt.4"><no>Part 4</no><heading guid="_e3230b0f-0553-4dea-ac9a-236abb011f6b" id="ch.3-pt.4-he">Term and area provisions</heading><clause affected.by.uncommenced="0" guid="_09ddaf8a-60df-4908-bb43-9f84ddcf7ee9" id="sec.134" provision.type="other" spent.amends="0"><no>134</no><heading guid="_feb49fb4-e50c-4901-a09b-a58607f70c66" id="sec.134-he">Term of GHG lease</heading><block><txt break.before="1">A GHG lease—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9d6c8386-2ea0-4d72-921c-e38197e8e900" id="sec.134-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">does not have a fixed term; and</txt></block></li><li guid="_fdc35b51-8571-4244-b94f-3ccb61056347" id="sec.134-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">continues in force until it is surrendered or otherwise ends under this Act.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_555d3ed6-a512-415d-a2a4-5f8fdaf4080d" id="sec.135" provision.type="other" spent.amends="0"><no>135</no><heading guid="_b88c2959-3d4f-41d9-9511-b6ef2865069a" id="sec.135-he">Area of GHG lease</heading><subclause affected.by.uncommenced="0" guid="_657f2b97-789c-49c1-a78a-4eb1fa830c41" id="sec.135-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section provides for the area of a GHG lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_897a7b0b-d6a4-4c29-9d4d-085e03de361f" id="sec.135-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The area does not include excluded land for the GHG lease.</txt><note guid="_c18fe9ef-835a-46c3-829d-37b477f022aa" id="sec.135-ssec.2-note" type="example"><heading guid="_734e691a-f5e6-4bb8-a55d-043a1339d4e9" id="sec.135-ssec.2-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.369B" target.guid="_d9b1575e-7c2a-404c-9b3e-19f30c1ce1e6">section 369B</intref><intref check="valid" refid="sec.369B-ssec.3" target.guid="_777242e4-b077-4ab7-9353-815d601f3782">(3)</intref> if land in the GHG lease’s area is taken under a resumption law.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_317336ef-2dd3-4f61-8401-c784659b861c" id="sec.135-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Unless the Minister otherwise decides, the area must form a single parcel of land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d951c526-bfe8-417e-a6f0-766f5ac20f42" id="sec.135-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The area must not include any of the following (<defterm guid="_137f9026-cafc-4cb9-807d-e7f3d31be38d" id="sec.135-def.unavailableland" type="definition">unavailable land</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2fe7d608-c20d-44bd-8de2-e073ebc8bad6" id="sec.135-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">land in the area of another GHG tenure other than land that will under <intref check="valid" refid="sec.48" target.guid="_5ddb6410-88fa-4e9c-909a-1535eab66cf5">section 48</intref>, cease to be included in the area of a GHG permit on the grant of the GHG lease;</txt></block></li><li guid="_5243f5a5-b4d5-414f-ba25-a15d8b7ef95e" id="sec.135-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">excluded land for another GHG tenure;</txt></block></li><li guid="_20a2ab25-f2ff-4f63-985d-9fa0e800f10e" id="sec.135-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">land that a regulation prescribes as land over which a GHG lease can not be granted.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0d854b1a-c1fc-4165-9896-d40593079075" id="sec.135-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The area may include a part of a sub-block only if the part is all areas within the sub-block that are left after taking away all unavailable land within the sub-block.</txt><note guid="_be14d695-54e4-460d-857c-ebefa3a17834" id="sec.135-ssec.5-note" type="example"><heading guid="_48fd71f2-f33b-4b00-b09e-2a05c05731bd" id="sec.135-ssec.5-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.369B" target.guid="_d9b1575e-7c2a-404c-9b3e-19f30c1ce1e6">section 369B</intref><intref check="valid" refid="sec.369B-ssec.3" target.guid="_777242e4-b077-4ab7-9353-815d601f3782">(3)</intref> if land in the GHG lease’s area is taken under a resumption law.</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_6c030c44-2a9b-499a-a562-d189e3f1aa2f" id="sec.136" provision.type="other" spent.amends="0"><no>136</no><heading guid="_6746bdf1-0619-4857-83d1-853438cdc6a7" id="sec.136-he">References to sub-blocks of GHG lease</heading><subclause affected.by.uncommenced="0" guid="_0bff5930-5c81-4851-b648-642f77130eab" id="sec.136-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a GHG lease states that its area includes land within a block without including or excluding any particular sub-block.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7f1012a0-b327-4733-b36e-db5012f046ab" id="sec.136-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The reference to the block is a reference to all sub-blocks within the block to the extent they do not consist of unavailable land.</txt><note guid="_87ea90e7-dd4d-4d6b-82d6-a439f1927458" id="sec.136-ssec.2-note" type="example"><heading guid="_e3a1c516-e636-4705-bbbc-57397aebc88f" id="sec.136-ssec.2-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.369B" target.guid="_d9b1575e-7c2a-404c-9b3e-19f30c1ce1e6">section 369B</intref><intref check="valid" refid="sec.369B-ssec.3" target.guid="_777242e4-b077-4ab7-9353-815d601f3782">(3)</intref> if land in the GHG lease’s area is taken under a resumption law.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_5a28974c-52a0-4c70-8ad0-428debb66d78" id="sec.136-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">To remove any doubt, it is declared that if land within any of the sub-blocks ceases to be unavailable land, the cessation itself does not cause the land to be within the GHG lease’s area.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_aa4e0410-6ee0-406a-bee0-30abe8c44211" id="sec.137" provision.type="other" spent.amends="0"><no>137</no><heading guid="_c3a41a8f-c06b-4870-b4f9-74c1f3042b91" id="sec.137-he">Minister’s power to decide excluded land</heading><subclause affected.by.uncommenced="0" guid="_6591dda4-9703-4112-ae5f-584e32433349" id="sec.137-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may decide excluded land for a GHG lease or proposed GHG lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ce84f366-615a-4605-9c2b-b0ed60c970bd" id="sec.137-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the power under <intref check="valid" refid="sec.137-ssec.1" target.guid="_6591dda4-9703-4112-ae5f-584e32433349">subsection (1)</intref> may be exercised only when the Minister is deciding whether to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f6c99232-1865-4b3d-9f2e-3aae7f741966" id="sec.137-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">grant the GHG lease; or</txt></block></li><li guid="_edf383c6-ed90-4fbb-a0db-40a334dd7d03" id="sec.137-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">approve any later development plan for the GHG lease.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e2188a55-c2f1-4df4-a13f-fced4914ad01" id="sec.137-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, excluded land—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a74e6491-48a1-4d37-a684-21260b729f60" id="sec.137-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must be within any sub-block included in the area of the GHG lease; and</txt></block></li><li guid="_ae365f74-6fb6-493d-91bd-860eafeff55b" id="sec.137-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">can not be a whole sub-block.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3fdc2fa4-af71-442f-8f43-e025b364ba3c" id="sec.137-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">For <intref check="valid" refid="sec.137-ssec.3" target.guid="_e2188a55-c2f1-4df4-a13f-fced4914ad01">subsection (3)</intref><intref check="valid" refid="sec.137-ssec.3-para1.a" target.guid="_a74e6491-48a1-4d37-a684-21260b729f60">(a)</intref>, if the register—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d9e1be0b-1fd0-4e39-95cf-a47bbe5b5016" id="sec.137-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">states that the GHG lease’s area includes land within a block; but</txt></block></li><li guid="_7bf5df76-50be-4314-aeb6-432502cdc420" id="sec.137-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">does not include or exclude any particular sub-block within that block;</txt></block></li></list></block><block><txt break.before="1">the reference to the block in the register is a reference to all sub-blocks within the block other than any sub-block that is completely within the area of another GHG tenure.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6b200200-3aea-4d0f-8130-6727acbef3b6" id="sec.137-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Excluded land may be described in a way the Minister considers appropriate, including for example, by area or by reference to a stated type of land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b6f740f5-2792-4155-8814-1fdf96693367" id="sec.137-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">Land ceases to be excluded land for a GHG lease if for any reason, the sub-block in which the land is located ceases to be in the lease’s area.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f83f3b28-c60b-424f-ae79-bcf519c66597" id="sec.138" provision.type="other" spent.amends="0"><no>138</no><heading guid="_ccf57f1f-d322-4143-8f0d-727940546257" id="sec.138-he">Minister may add excluded land</heading><subclause affected.by.uncommenced="0" guid="_e9cadb7c-95be-4098-ab64-aa58ffe6089e" id="sec.138-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may amend a GHG lease by adding excluded land for the GHG lease to its area only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0c511b85-bcb4-494e-bf37-c5b3fd969cc0" id="sec.138-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the GHG lease as amended complies with <intref check="valid" refid="sec.135" target.guid="_555d3ed6-a512-415d-a2a4-5f8fdaf4080d">section 135</intref>; and</txt></block></li><li guid="_99d59b02-687d-4965-8998-aad99dfb516f" id="sec.138-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the GHG lease holder consents.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_83998cd9-80ba-4a03-81b0-8de528ebda92" id="sec.138-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If land mentioned in <intref check="valid" refid="sec.138-ssec.1" target.guid="_e9cadb7c-95be-4098-ab64-aa58ffe6089e">subsection (1)</intref> is added to the area of the GHG lease, the land ceases to be excluded land for the lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5e69724d-9563-43d8-9f85-d5882c45366a" id="sec.138-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister may amend the provisions of the GHG lease in a way that reflects the inclusion of the excluded land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d53741b2-db10-4e15-9ff2-12c53fdc179f" id="sec.138-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Also, the Minister may give the GHG lease holder a notice—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_abeca313-c705-4a6a-ba08-afd6f74e6d75" id="sec.138-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">withdrawing from a stated day, the approval of the development plan for the GHG lease; and</txt></block></li><li guid="_ad0469fe-65fa-4093-a601-a1b914a288d5" id="sec.138-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">directing the holder to give the Minister a proposed later development plan for the GHG lease that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_aaa5aa29-7615-4fbe-bf2b-1abc37e0fa59" id="sec.138-ssec.4-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">complies with the later development plan requirements; and</txt></block></li><li guid="_845ebfaa-e97d-465a-8821-1cdabab975ad" id="sec.138-ssec.4-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">changes the development plan for the GHG lease to reflect the inclusion of the excluded land.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_bd637406-55ca-438f-9b06-090b6128dcd7" id="sec.138-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The amended provisions of the GHG lease or the proposed later development plan must not be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_416daccc-d380-4c51-8c29-5bcec96a23e6" id="sec.138-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">inconsistent with the mandatory conditions for GHG leases; or</txt></block></li><li guid="_776de12b-49e1-4df0-b6ec-34d13cd0a548" id="sec.138-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the same as or substantially the same as or inconsistent with any relevant environmental condition.</txt></block></li></list></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_75d19f56-2004-45c4-ae39-f178873a4bb6" id="ch.3-pt.5"><no>Part 5</no><heading guid="_75f08a76-1de9-4b7b-bdef-7e80155d3f4c" id="ch.3-pt.5-he">Development plans</heading><division affected.by.uncommenced="0" guid="_8bb56c07-331c-4b82-bb5b-ba1357bab534" id="ch.3-pt.5-div.1"><no>Division 1</no><heading guid="_de88a127-099c-4e67-aed0-04de2b558e90" id="ch.3-pt.5-div.1-he">Function and purpose</heading><clause affected.by.uncommenced="0" guid="_b4c30043-01a2-4492-8245-8b56e5d3f940" id="sec.139" provision.type="other" spent.amends="0"><no>139</no><heading guid="_f60c6c3a-a8ce-4a87-b50f-a0cd461bdbdd" id="sec.139-he">Function and purpose</heading><subclause affected.by.uncommenced="0" guid="_60ff6b0e-3bb4-4e0c-a947-e4f844c263bd" id="sec.139-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The development plan for a GHG lease (the <defterm guid="_dcc631d1-49fd-4e41-b7d3-a60985120e1c" id="sec.139-def.relevantlease" type="definition">relevant lease</defterm>) gives detailed information about the nature and extent of activities to be carried out under the relevant lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b9390fcb-f7d4-47aa-b165-d561aa072063" id="sec.139-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The development plan may—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_606d09d7-1f6b-466e-b7f9-4c3ee164ee5e" id="sec.139-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">also relate to another GHG lease or proposed GHG lease if the other GHG lease or proposed GHG lease relates to the relevant lease; and</txt></block></li><li guid="_aeccb8a5-cbbc-466e-8a36-55d47ff991b1" id="sec.139-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">provide that when the plan is approved it will replace any development plan for the other lease.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e1024b10-0d49-4d6d-b6d7-79e877affef8" id="sec.139-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The purposes of giving the information are to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_616727c6-d902-436a-bcd8-246afb12ac6e" id="sec.139-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">allow resource management decisions to be made; and</txt></block></li><li guid="_0db221f8-99fe-490e-ae46-05cadd91c621" id="sec.139-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">ensure appropriate development of the GHG lease.</txt></block></li></list></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_1fb7524d-b95f-4053-b610-26e3d302ba1a" id="ch.3-pt.5-div.2"><no>Division 2</no><heading guid="_6bfad1d0-8b10-4996-8301-19fbf08024af" id="ch.3-pt.5-div.2-he">Requirements for proposed initial development plans</heading><clause affected.by.uncommenced="0" guid="_8e99c701-d8a7-4755-af9b-389017d20fcb" id="sec.140" provision.type="other" spent.amends="0"><no>140</no><heading guid="_95f9b865-7a88-4cb7-826c-7bcdbbd14b9d" id="sec.140-he">Operation of <intref check="valid" refid="ch.3-pt.5-div.2" target.guid="_1fb7524d-b95f-4053-b610-26e3d302ba1a">div 2</intref></heading><block><txt break.before="1">This division provides for requirements (the <defterm guid="_5ba9d38e-903c-4b4b-ae7f-e1c567a4776d" id="def.initialdevelopmentplanrequirements" type="definition">initial development plan requirements</defterm>) for a proposed initial development plan for a proposed GHG lease.</txt></block></clause><clause affected.by.uncommenced="0" guid="_f1214f52-a858-483e-919b-73b47f3f54ec" id="sec.141" provision.type="other" spent.amends="0"><no>141</no><heading guid="_7fbd4da5-e9c7-4ef6-aad2-293a64f77bda" id="sec.141-he">General requirements</heading><subclause affected.by.uncommenced="0" guid="_478ae7a9-bd97-4833-a5bb-3c2b629f7d8c" id="sec.141-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The proposed plan must provide for all of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_09d8487c-778e-4e4e-9bb5-287902004e61" id="sec.141-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an overview of the activities proposed to be carried out under the proposed GHG lease during all of its term;</txt></block></li><li guid="_db3272f3-fead-4f96-9e1e-2bba6494d0f1" id="sec.141-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a description of the activities proposed to be carried out under the GHG lease during each year of the plan period;</txt></block></li><li guid="_df944029-ce32-4b52-9517-64e3a52360e4" id="sec.141-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">each of the following for each GHG stream storage site in the GHG lease’s area—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f4302cbb-98b5-4c1b-a815-8129e9520b74" id="sec.141-ssec.1-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a site plan that complies with <intref check="valid" refid="sec.142" target.guid="_2e3fcd76-2f67-4a59-a019-d6b8ebc18f6f">section 142</intref>;</txt></block></li><li guid="_9be74791-cecf-4255-bd17-a6621a5f8788" id="sec.141-ssec.1-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a verifiable estimate of the GHG stream storage site’s capacity;</txt></block></li><li guid="_4b919594-54d1-4694-9044-eeb6b98fddba" id="sec.141-ssec.1-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">a monitoring and verification plan that complies with <intref check="valid" refid="sec.145" target.guid="_89fd66d8-9a5d-4f6a-9d76-420b0d72f535">section 145</intref>;</txt></block></li></list></block></li><li guid="_e4ab6ef7-0c7b-46f0-bd35-51d31b2c2e0c" id="sec.141-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the composition of GHG streams proposed to be injected or used for GHG stream storage under the GHG lease;</txt></block></li><li guid="_3756d324-9a7f-4724-9e77-b5402aa25b60" id="sec.141-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">a description of any pipeline land for the GHG lease;</txt></block></li><li guid="_993fea13-5427-471b-8497-0344dba22c99" id="sec.141-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">reasons why the plan is considered appropriate;</txt></block></li><li guid="_d8c5dd6f-8d56-4ed8-8b7e-4bcb3b089a94" id="sec.141-ssec.1-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">another matter prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e6dcba54-1f48-4958-ba49-79c145df2806" id="sec.141-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The proposed plan may include any other information relevant to the development plan criteria.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_866a99a5-0162-4636-802e-8b9d9e7b9657" id="sec.141-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The composition of GHG streams to be injected under proposed GHG lease must comply with <intref check="valid" refid="sec.164" target.guid="_f56f6fdd-2cfc-412f-b56a-ff27baaf01e3">section 164</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c342bdd5-f431-4a57-ad8e-97abde392bf8" id="sec.141-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A regulation may impose requirements about the form of the development plan.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_26e13d16-cac5-4872-9e97-7779ac73fdcc" id="sec.141-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_45318257-ec45-4654-9e79-c2763b9a90c5" id="sec.141-ssec.5-def.year_"><txt break.before="1"><defterm guid="_4666ba95-9469-48a2-b84f-a7d8548ab8f0" id="sec.141-ssec.5-def.year" type="definition">year</defterm>, of the plan period, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_785ef1a1-cc3f-438c-9d4a-c5f5902425a2" id="sec.141-ssec.5-def.year-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the period starting on the day the plan period starts and ending on the first anniversary of that day; and</txt></block></li><li guid="_c4244c85-1afd-406b-bf75-92a83e45877d" id="sec.141-ssec.5-def.year-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">each subsequent period of 12 months or less during the plan period starting on each anniversary of that day and ending on—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b5d9f08c-cba1-4040-9548-88734e38f3b6" id="sec.141-ssec.5-def.year-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the next anniversary of that day; or</txt></block></li><li guid="_6da77c2d-aa83-4eb8-bcc3-2e1a6eecc41c" id="sec.141-ssec.5-def.year-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the plan period ends before the next anniversary—the day the plan period ends.</txt></block></li></list></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2e3fcd76-2f67-4a59-a019-d6b8ebc18f6f" id="sec.142" provision.type="other" spent.amends="0"><no>142</no><heading guid="_133d6ce3-588a-487d-b15a-0cc8436b3ab9" id="sec.142-he">Site plan</heading><subclause affected.by.uncommenced="0" guid="_b4b91270-26ec-4257-b022-55bc32157d25" id="sec.142-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A site plan for a GHG stream storage site must consist of maps, geological cross-sections, three dimensional models and other appropriate information about the site.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0fcaba5e-e3d7-49dc-9d8f-77bfe7c32f6c" id="sec.142-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.142-ssec.1" target.guid="_b4b91270-26ec-4257-b022-55bc32157d25">subsection (1)</intref>, the site plan must show each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_29ed96a6-452a-430d-a962-84e95444c3ea" id="sec.142-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the geological structure and geochemical composition of the relevant GHG storage reservoir;</txt></block></li><li guid="_12a5d28c-0020-45cf-9a13-39dc1fabd579" id="sec.142-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the GHG storage reservoir’s properties, including the potential interaction of carbon dioxide with its rock matrix and fluids;</txt></block></li><li guid="_3e618bda-80e7-404e-b737-cd16b3d2f91f" id="sec.142-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the proposed rate of GHG stream injection;</txt></block></li><li guid="_d1b7e9cd-a0ca-4ac1-ad95-0aaea742a4a3" id="sec.142-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the proposed composition of the GHG streams to be injected;</txt></block></li><li guid="_3858c90f-6bb9-4419-b839-c7d5a3e5f6cd" id="sec.142-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the expected migration pathway of the GHG streams;</txt></block></li><li guid="_a9973f71-7103-48c0-95ea-da6c4b647b68" id="sec.142-ssec.2-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">the operations and techniques to be used to monitor and verify the behaviour of GHG streams during the term of the GHG lease.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_46e963e5-f116-44df-b1d2-f38b3a988d42" id="sec.142-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The site plan must include any other information prescribed under a regulation.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_de896108-11ac-426f-b045-8d321bb80cd4" id="sec.143" provision.type="other" spent.amends="0"><no>143</no><heading guid="_a0faf067-bd88-4a28-a1fc-006e4d2519f6" id="sec.143-he">Petroleum wells to be assumed</heading><block><txt break.before="1">If under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.75U" target.doc.id="act-1923-026" target.guid="_e2adb97a-3a24-43b4-94be-0de9efae841a" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act">section 75U</legref> or the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref><legref check="valid" jurisd="QLD" refid="sec.292" target.doc.id="act-2004-025" target.guid="_21940938-f87d-4dd6-9453-0c2e8fab326c" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">section 292</legref>, the proposed GHG lease holder proposes to assume responsibility for a petroleum well, the proposed plan must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_53a6de7a-602a-4438-ae0e-d47d70254597" id="sec.143-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">identify the wells; and</txt></block></li><li guid="_2b4af2f4-9349-4c88-b4be-5adf9c847084" id="sec.143-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">describe the GHG storage activities proposed to be carried out relating to the wells.</txt></block></li></list><note guid="_7c23a7b8-f5c2-4622-91e8-e092bc9be2ca" id="sec.143-note" type="example"><heading guid="_623a2eb4-4599-4766-a766-0620768f4d55" id="sec.143-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.263" target.guid="_3a7496c4-00ac-4146-96dd-0e65ca1a1a1d">sections 263</intref> (Former petroleum wells assumed by GHG tenure holder) and <intref check="valid" refid="sec.267" target.guid="_0f9dc122-df5d-4fa0-90ae-718fa0e66f51">267</intref> (Obligation to decommission).</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_da211c3d-5b6d-4f01-8f99-5e6587061d9a" id="sec.144" provision.type="other" spent.amends="0"><no>144</no><heading guid="_be177cbb-e726-4140-8016-134bb9621e13" id="sec.144-he">Water issues</heading><subclause affected.by.uncommenced="0" guid="_3d6c64e1-4acd-4f0d-9991-2ac94d21c7f8" id="sec.144-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">In preparing the proposed plan, the proposed GHG lease holder must have regard to potential groundwater issues.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4f67b5f4-07e1-455e-b524-2555fbc1e374" id="sec.144-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The proposed plan must include a plan for the treatment and disposal of any water taken or that may be taken because of the carrying out of authorised activities for the proposed GHG lease.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_89fd66d8-9a5d-4f6a-9d76-420b0d72f535" id="sec.145" provision.type="other" spent.amends="0"><no>145</no><heading guid="_9e62b33e-003f-4f83-b4d3-060e88d0fb6b" id="sec.145-he">Monitoring and verification plan</heading><block><txt break.before="1">The proposed development plan must include a plan for the observation and monitoring of the migration pathway or pathways of GHG streams before, during and after injection into the relevant GHG storage reservoir.</txt></block></clause><clause affected.by.uncommenced="0" guid="_c3d24053-7a72-49b3-be4d-015d50386417" id="sec.146" provision.type="other" spent.amends="0"><no>146</no><heading guid="_95f3bed1-908e-49e8-845f-80046a2e5ebb" id="sec.146-he">Plan period</heading><subclause affected.by.uncommenced="0" guid="_73ee2d78-2b46-4709-9164-3f3860ac966b" id="sec.146-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The proposed plan must state its period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_24785e64-c9bb-4f4b-b8f9-6895b19f2386" id="sec.146-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the proposed plan relates to a tender, the period must be the same as the required period under the relevant call for tenders.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ea00a79d-0191-4c48-aa95-8be178c209f1" id="sec.146-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the proposed plan relates to a permit-related application, the period must not be longer than 5 years from when the proposed GHG lease is to take effect.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_763dfde4-be27-4e1b-9728-ea4a56d1a546" id="ch.3-pt.5-div.3"><no>Division 3</no><heading guid="_55b14c6d-68b6-49ad-ae04-f99d08d0002c" id="ch.3-pt.5-div.3-he">Approval of proposed initial development plans</heading><note guid="_6dff6730-690f-45d5-96fd-15be7dcd14a7" id="ch.3-pt.5-div.3-note" type="example"><heading guid="_85308bcb-0e09-413c-95c6-08dec9b18101" id="ch.3-pt.5-div.3-note-he">Note—</heading><block><txt break.before="1">For the requirement for approval of an initial development plan, see <intref check="valid" refid="sec.117" target.guid="_f47d958c-f1e6-4adc-bc6f-f1e9d5df4606">sections 117</intref> and <intref check="valid" refid="sec.130" target.guid="_15ecfe70-1880-44a0-ab4b-14e663a921dc">130</intref>.</txt></block></note><clause affected.by.uncommenced="0" guid="_1aa67aa9-88d3-4170-97de-d03853958694" id="sec.147" provision.type="other" spent.amends="0"><no>147</no><heading guid="_45e84e90-7ac1-4b8c-95be-c9931e2a89f9" id="sec.147-he">Criteria for decision</heading><subclause affected.by.uncommenced="0" guid="_9c768bce-293b-4dac-b5ce-f37487802dcb" id="sec.147-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">In deciding whether to approve a proposed development plan the Minister must consider—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_865556cf-8444-46cb-8251-5a95806a8791" id="sec.147-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the potential of the area of the proposed GHG lease for GHG stream storage and related activities; and</txt></block></li><li guid="_2bfa4729-41e6-402a-bb0a-1912957e2a25" id="sec.147-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the nature and extent of the activities and when and where they are proposed to be carried out; and</txt></block></li><li guid="_8238b379-7c91-40c6-857d-319d9551e778" id="sec.147-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">whether GHG stream storage under the GHG lease will be optimised in the best interests of the State; and</txt></block></li><li guid="_68231f16-9f1c-41b0-87fb-6a79483741db" id="sec.147-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the nature and extent of water disposal and treatment activities; and</txt></block></li><li guid="_8a7cc940-0f79-4384-b3a2-6b7255f0a011" id="sec.147-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">any relevant authorisation required under the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9d99874f-7745-4432-9790-7cb99ad41d99" id="sec.147-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The matters mentioned in <intref check="valid" refid="sec.147-ssec.1" target.guid="_9c768bce-293b-4dac-b5ce-f37487802dcb">subsection (1)</intref> are the <defterm guid="_b1276570-69cf-49a1-91c1-cf01e0e3e098" id="sec.147-def.developmentplancriteria" type="definition">development plan criteria</defterm>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_af0462f8-664d-4769-ad8d-cf0f124de471" id="sec.148" provision.type="other" spent.amends="0"><no>148</no><heading guid="_0db55410-e800-475c-8be5-aad27843d52c" id="sec.148-he">Verification may be required</heading><subclause affected.by.uncommenced="0" guid="_2f15da43-3ea6-4b5e-9a43-1478aac148c0" id="sec.148-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may by notice require the applicant to give the Minister within a stated reasonable period a document made by an appropriately qualified independent person that verifies—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5d78d115-ce44-4ca2-b749-2c0f9d7acb31" id="sec.148-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an assessment of data supplied in the proposed initial development plan; or</txt></block></li><li guid="_adade5a0-0d48-4081-ae1d-0cf2bd3946f6" id="sec.148-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the source of the data; or</txt></block></li><li guid="_9160335e-6c95-4286-b55c-35b29ed25b07" id="sec.148-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the work done for the development plan; or</txt></block></li><li guid="_fb997c54-2ff9-4ba9-8d91-c950d8881889" id="sec.148-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">that, in the person’s opinion, the applicant has—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_98d58bef-b9ed-4dbf-ab2f-605a1bcd8334" id="sec.148-ssec.1-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the financial and technical resources to carry out authorised activities for the proposed GHG lease; and</txt></block></li><li guid="_2a1a6b56-79a2-4100-a738-c3dd4fc5fb4e" id="sec.148-ssec.1-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the ability to manage GHG stream storage.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_842ada85-ff48-47fc-bab0-5a22bea05c35" id="sec.148-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the applicant does not comply with the requirement, the Minister may refuse to approve the development plan.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_95a659cf-f774-4d53-bcad-ec553ab261be" id="sec.148-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The applicant must pay any costs incurred in complying with the requirement.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b318f3b9-8855-4838-8690-3b2163d198d9" id="sec.149" provision.type="other" spent.amends="0"><no>149</no><heading guid="_7d84f34a-5443-4193-abe8-fee71dc3982e" id="sec.149-he">Referral to Water Act Minister</heading><block><txt break.before="1">The Minister can not approve the proposed plan unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_019d8aa6-541b-4ad3-94f5-4577d4b56d24" id="sec.149-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the Minister has given the Water Act Minister a copy of the proposed plan; and</txt></block></li><li guid="_e4418acb-1ddd-4caf-a033-898b3bf26e4e" id="sec.149-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Water Act Minister has approved the proposed development plan to the extent it relates to potential groundwater issues.</txt></block></li></list></block></clause></division><division affected.by.uncommenced="0" guid="_a66ddfa6-d919-4f3c-a137-24ce0474c259" id="ch.3-pt.5-div.4"><no>Division 4</no><heading guid="_a04f5f20-08b1-45ba-8146-cfa6aa4a9556" id="ch.3-pt.5-div.4-he">Requirements for proposed later development plans</heading><clause affected.by.uncommenced="0" guid="_578a81dd-7b24-41b9-88ad-bfb098179fe9" id="sec.150" provision.type="other" spent.amends="0"><no>150</no><heading guid="_ebf40ff3-700d-4ae8-a070-37499ab11fd2" id="sec.150-he">Operation of <intref check="valid" refid="ch.3-pt.5-div.4" target.guid="_a66ddfa6-d919-4f3c-a137-24ce0474c259">div 4</intref></heading><block><txt break.before="1">This division provides for requirements (the <defterm guid="_832c80b3-398a-4dbc-86d7-966e322c166a" id="def.laterdevelopmentplanrequirements" type="definition">later development plan requirements</defterm>) for a proposed later development plan for a GHG lease.</txt><note guid="_80f562d8-b299-41c5-a53e-9981b82195f4" id="sec.150-note" type="example"><heading guid="_2de62eac-7d9b-4f58-9c1c-a2dce8bfda25" id="sec.150-note-he">Note—</heading><block><txt break.before="1">For the requirements to give a proposed later development plan, see <intref check="valid" refid="sec.47" target.guid="_43a28c5a-9e0c-4853-a720-4eb5bb964223">sections 47</intref> (Minister may add excluded land), <intref check="valid" refid="sec.172" target.guid="_909d8642-9df9-4d09-aa4e-e3bfcc1826ea">172</intref> (Obligation to give proposed later development program) and <intref check="valid" refid="sec.379" target.guid="_7bb5ce56-1401-4239-84f9-bb0e4d600312">379</intref> (Types of noncompliance action that may be taken).</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_71fd12fd-2479-4ba3-b3de-71b9a2b51702" id="sec.151" provision.type="other" spent.amends="0"><no>151</no><heading guid="_52b8ac04-436c-465a-98d7-e3e47324e7b2" id="sec.151-he">General requirements</heading><subclause affected.by.uncommenced="0" guid="_7c7a2da9-f340-437a-9a03-577a4f0b6af8" id="sec.151-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The proposed plan must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_104e18e9-09f3-4177-98c3-0f97c853923d" id="sec.151-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">comply with the initial development plan requirements; and</txt></block></li><li guid="_abde2eb7-37b7-4078-825a-04abaa9cf4bb" id="sec.151-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">highlight any significant changes from the current development plan for the GHG lease; and</txt></block></li><li guid="_fecfe750-0da5-4f4d-a3b2-dc0417eb1a51" id="sec.151-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the current development plan has not been complied with—state the details of and the reasons for each noncompliance.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a7c539b6-2db5-4e17-8bae-958c15e7b333" id="sec.151-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the effect of the proposed plan is to significantly change an activity provided for under the current development plan for the GHG lease, the proposed plan must also state reasons for the change.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a38def82-e3ea-4afb-a07c-74b6bf4ee500" id="sec.151-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, for a significant change that is a reduction of GHG stream injection, the proposed plan must include an evaluation of the following in the GHG lease’s area—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bfeaee21-a76e-4739-b1b2-2ea05b338c7b" id="sec.151-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the potential for GHG stream storage;</txt></block></li><li guid="_55833745-fc1d-4733-9609-d26b7bcacd60" id="sec.151-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">market opportunities for GHG stream storage.</txt></block></li></list></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_cf86814e-5e42-4331-bd8f-cbb74276ddaa" id="ch.3-pt.5-div.5"><no>Division 5</no><heading guid="_8aa02093-ddb0-4478-a9ec-3be0e83f1446" id="ch.3-pt.5-div.5-he">Approval of proposed later development plans</heading><clause affected.by.uncommenced="0" guid="_e27aacd3-2113-4eef-81f0-7a3f541ade00" id="sec.152" provision.type="other" spent.amends="0"><no>152</no><heading guid="_8220ad51-9d34-424b-b8c3-15c4a693ae1b" id="sec.152-he">Application of <intref check="valid" refid="ch.3-pt.5-div.5" target.guid="_cf86814e-5e42-4331-bd8f-cbb74276ddaa">div 5</intref></heading><block><txt break.before="1">This division applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cc695b2f-0722-4189-8e6b-ed111e26cdb8" id="sec.152-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">under this Act, a proposed later development plan is given to the Minister for approval; or</txt></block></li><li guid="_f3ed8054-2b6f-4911-9cfa-f42eb38437db" id="sec.152-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Minister is considering an application under <intref check="valid" refid="sec.188" target.guid="_78083c38-574b-4406-ae1a-4c792ee2d43f">section 188</intref> for approval of a proposed GHG coordination arrangement.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_88fbdc45-2ecc-4f92-87f1-2b73c089ae4f" id="sec.153" provision.type="other" spent.amends="0"><no>153</no><heading guid="_b1eac2e3-dea4-4966-9435-f638979e68fe" id="sec.153-he">GHG lease taken to have development plan until decision on whether to approve proposed development plan</heading><subclause affected.by.uncommenced="0" guid="_a673b4e6-3beb-4184-9936-4b6243742298" id="sec.153-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies until—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_33cf5134-27d7-4ac8-844c-751ba32a5032" id="sec.153-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the approval is given—the holder is given notice of the approval; or</txt></block></li><li guid="_90f20c96-dd51-456a-b421-bb1373fba09f" id="sec.153-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the approval is refused—when the refusal takes effect.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_30302027-9203-4dd9-9293-38c5a9f031ba" id="sec.153-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite the ending of the plan period for the current development plan for the GHG lease—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_89ba3111-eca3-4bcb-a7f5-d7bffa418ec4" id="sec.153-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the GHG lease is taken to have a development plan; and</txt></block></li><li guid="_7367647c-5aed-4963-a0eb-5ba720c669df" id="sec.153-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder may carry out any authorised activity for the GHG lease.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_11ea3671-fd9f-4f20-a40e-3560746e084e" id="sec.154" provision.type="other" spent.amends="0"><no>154</no><heading guid="_49618627-e7ab-44d3-9e13-17bf3c466494" id="sec.154-he">Deciding whether to approve proposed plan</heading><subclause affected.by.uncommenced="0" guid="_a9cb7252-8676-40c6-aa38-5b6ef8579783" id="sec.154-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may approve or refuse to approve the proposed plan.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_28874457-3b24-4523-92f7-e18644d77102" id="sec.154-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In deciding whether to approve the proposed plan the Minister must consider each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3be527aa-c174-47e3-ba93-f46f278c57a3" id="sec.154-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the development plan criteria;</txt></block></li><li guid="_3bd9b5cd-3ad0-47d3-8403-8512f82ecee0" id="sec.154-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the extent to which the current development plan for the GHG lease has been complied with;</txt></block></li><li guid="_eba462ec-15f9-45af-a216-976d9440d156" id="sec.154-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the proposed plan provides for a significant change that is a reduction of GHG stream injection—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fc31b58f-4608-48b0-ac13-3418fefb2d14" id="sec.154-ssec.2-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">whether the reduction is reasonable; and</txt></block></li><li guid="_db2eeb49-62c1-4944-8c52-1b6a1dbfcc1a" id="sec.154-ssec.2-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">whether the GHG lease holder has taken all reasonable steps to prevent the reduction.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e92d6cdb-7b40-4a68-b5dd-37ee8f80cf2b" id="sec.154-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, if the GHG lease was granted in response to a tender, any other development plan proposed by other tenderers for the lease must be considered.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e7520ae4-c95d-467f-b861-c08ffdbd0021" id="sec.154-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.154-ssec.3" target.guid="_e92d6cdb-7b40-4a68-b5dd-37ee8f80cf2b">subsection (3)</intref> applies only to the extent the other plan includes the period of the proposed plan.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_fcd9ff99-420b-463b-8b57-d2d2ec134a67" id="sec.155" provision.type="other" spent.amends="0"><no>155</no><heading guid="_a1c515ff-858c-4a0c-8ba0-43093eaced22" id="sec.155-he">Steps after, and taking effect of, decision</heading><subclause affected.by.uncommenced="0" guid="_6f2914c1-d95a-4d31-a03e-c92c0e1b1125" id="sec.155-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the Minister decides to approve the proposed later development plan, the Minister must give the holder notice of the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_552ee82f-a247-42f1-a227-2111c332fece" id="sec.155-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The approval takes effect when the holder is given the notice or if the notice states a later day of effect, on that later day.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_26a9b69a-d623-487d-afe9-381e17211fed" id="sec.155-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the Minister decides to refuse to approve the proposed plan, the Minister must give the holder an information notice about the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_48577058-fa34-477b-b6d7-2c83a93fc1ef" id="sec.155-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The refusal does not takes effect until the end the appeal period for the decision to refuse.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_5c0e62ec-5e23-41d8-9e39-c655567c61e2" id="ch.3-pt.5-div.6"><no>Division 6</no><heading guid="_596e47c8-bdbf-45e6-9414-a6e56cfe4b77" id="ch.3-pt.5-div.6-he">Amending development plans</heading><clause affected.by.uncommenced="0" guid="_ad1a2e21-606c-4072-81de-36ecf611b896" id="sec.156" provision.type="other" spent.amends="0"><no>156</no><heading guid="_76a263c4-7b57-444e-8484-6b0cd7ff07e5" id="sec.156-he">Restrictions on amendment</heading><subclause affected.by.uncommenced="0" guid="_8ed3e1ea-aedf-49aa-982c-bb1ff7a3c9fe" id="sec.156-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A GHG lease holder may amend the development plan for the GHG lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fde1b967-f81b-4488-8098-158efb6cebce" id="sec.156-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the amendment is subject to approval under this division.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_cc1102d6-c09b-432a-a02b-17b28ba6db15" id="sec.156-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, a development plan can not be amended—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f53f9115-c8b1-4717-813b-ca09471bdce0" id="sec.156-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in a way that provides for a cessation of GHG stream injection under a GHG lease; or</txt><note guid="_f74c1944-5d8e-45f8-8a22-32cf05d28d7f" id="sec.156-ssec.3-para1.a-note" type="example"><heading guid="_6e7a3b76-5bdc-414c-bd55-b52b740c6414" id="sec.156-ssec.3-para1.a-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="sec.176" target.guid="_59722a5c-66e2-4e99-990e-8684129a764f">section 176</intref> (Timing of surrender application).</txt></block></note></block></li><li guid="_e09f4a1b-da17-46ae-86df-261b64a23d3d" id="sec.156-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the plan as amended would not comply with the later development plan requirements.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7be65fb7-c040-4840-aa16-fef1ba786e2d" id="sec.157" provision.type="other" spent.amends="0"><no>157</no><heading guid="_e5e9b21c-51b7-4fe2-ae8e-4c7e58136334" id="sec.157-he">Applying for approval to amend</heading><subclause affected.by.uncommenced="0" guid="_cdc3162b-bf56-4314-a392-42084cb74c26" id="sec.157-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A GHG lease holder may apply for approval to amend the development plan for the lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8adfc812-f3d1-4a36-a184-0e20ca5dcd27" id="sec.157-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application must be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8e1f6abc-c962-4f8d-9acc-f100f3ed1cff" id="sec.157-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">made to the Minister in the approved form; and</txt></block></li><li guid="_83cf63e0-79a0-4e8c-b78e-63f1d6758938" id="sec.157-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">accompanied by the fee prescribed under a regulation.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_db909d9c-02ff-4b72-9cb0-9f66505421a1" id="sec.158" provision.type="other" spent.amends="0"><no>158</no><heading guid="_b8106dc9-59a2-4248-b242-09332936222a" id="sec.158-he">Deciding application</heading><block><txt break.before="1">In deciding whether to approve the proposed amendment the Minister must consider—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_45f15192-7dd3-47c2-b51c-11fe826dee83" id="sec.158-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the development plan criteria; and</txt></block></li><li guid="_e59db529-44c1-4290-abf1-683eddb23580" id="sec.158-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the extent to which the current development plan for the GHG lease has been complied with; and</txt></block></li><li guid="_5013047d-0ac5-47fe-b490-ffc8e3e3dc7c" id="sec.158-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the proposed plan provides for a significant change that is a reduction of GHG stream injection—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2b7e22d0-fa57-442b-b6ab-94c8911c1e23" id="sec.158-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">whether the reduction is reasonable; and</txt></block></li><li guid="_e7bfb602-b65a-4dbf-bea3-8f918c2dbf33" id="sec.158-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">whether the GHG lease holder has taken all reasonable steps to prevent the reduction.</txt></block></li></list></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_c93daf86-e432-4523-b8e7-7b72b1631f4c" id="sec.159" provision.type="other" spent.amends="0"><no>159</no><heading guid="_f8704984-1a3b-4f23-9024-b04174e2e0d3" id="sec.159-he">Steps after, and taking effect of, decision</heading><subclause affected.by.uncommenced="0" guid="_0c67ba6c-ad8b-4d6f-91e8-1795c54945eb" id="sec.159-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the Minister decides to approve the proposed amendment, the Minister must give the holder notice of the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b876b992-9f95-4dcb-852d-47b2920c907b" id="sec.159-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the Minister decides to refuse to approve the proposed amendment, the Minister must give the applicant an information notice about the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_45bb3cda-af94-426a-be2d-4d004b1d7482" id="sec.159-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The refusal takes effect when the holder is given the notice or if the notice states a later day of effect, on that later day.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_832c1f2e-bfaf-4570-a60e-6c79ae0669f6" id="ch.3-pt.6"><no>Part 6</no><heading guid="_69b33a4b-e169-4215-9e2e-bae38613553b" id="ch.3-pt.6-he">Key mandatory conditions for GHG leases</heading><clause affected.by.uncommenced="0" guid="_646e31ef-2b2b-4073-956a-984a8cea4dbb" id="sec.160" provision.type="other" spent.amends="0"><no>160</no><heading guid="_7103c75d-f373-480d-9cc0-d00e40d291c2" id="sec.160-he">Operation of <intref check="valid" refid="ch.3-pt.6" target.guid="_832c1f2e-bfaf-4570-a60e-6c79ae0669f6">pt 6</intref></heading><block><txt break.before="1">This part provides for particular mandatory conditions for GHG leases.</txt></block></clause><clause affected.by.uncommenced="0" guid="_193e1f80-314c-4674-b178-45fd94f91f9a" id="sec.161" provision.type="other" spent.amends="0"><no>161</no><heading guid="_ff2335d8-0f68-462a-b527-886049628721" id="sec.161-he">Compliance with test plan for GHG storage injection testing</heading><subclause affected.by.uncommenced="0" guid="_d3eb05cd-4f75-4e6b-9459-051cd8e00603" id="sec.161-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A GHG lease holder may carry out GHG storage injection testing only in accordance with the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7a36c363-cab1-438a-96d8-700eccc39964" id="sec.161-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a test plan for that purpose approved by the Minister;</txt></block></li><li guid="_5dbb2a0d-5c75-43da-89ff-91ff6aac98d9" id="sec.161-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">all conditions of the approval.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5b7794ca-0797-4200-beb6-93210349dc28" id="sec.161-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The holder may ask the Minister to approve a test plan proposed by the holder.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_01fc2648-d27c-4787-9755-10e58f093442" id="sec.161-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The proposed test plan must comply with any requirements prescribed under a regulation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8a025e73-12f5-411c-83e3-eeacec8e732b" id="sec.161-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The Minister may impose conditions on the granting of the approval.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0e3f4c8e-85e8-4ad5-8e18-6c1af994e0ba" id="sec.161-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the Minister decides to refuse to approve the proposed test plan or to impose conditions on the granting of the approval, the Minister must give the holder an information notice about the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_ae875a59-ea64-43ac-91a7-d717e2b19613" id="sec.162" provision.type="other" spent.amends="0"><no>162</no><heading guid="_85538fe4-4df8-46a2-ad70-a5dc87843fb2" id="sec.162-he">Restriction on substances that may be used for GHG storage injection testing</heading><block><txt break.before="1">A GHG lease holder can not use a substance other than a GHG stream or water for injection for GHG storage.</txt></block></clause><clause affected.by.uncommenced="0" guid="_39c73780-a7ba-4e21-9ef5-98eb4deabdcc" id="sec.163" provision.type="other" spent.amends="0"><no>163</no><heading guid="_2d543847-7dc2-4dc6-b51e-344ffcb09ba9" id="sec.163-he">Restriction on substances that may be used for GHG stream storage</heading><block><txt break.before="1">A GHG lease holder can not use a substance other than a GHG stream for GHG stream storage.</txt></block></clause><clause affected.by.uncommenced="0" guid="_f56f6fdd-2cfc-412f-b56a-ff27baaf01e3" id="sec.164" provision.type="other" spent.amends="0"><no>164</no><heading guid="_5ad1ea49-b527-4f58-9111-0d381683017d" id="sec.164-he">Restriction on GHG streams that may be used</heading><block><txt break.before="1">A GHG lease holder may use a GHG stream for GHG storage injection testing or GHG stream storage only if it consists only of carbon dioxide and—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f0c4e911-20b0-4235-8bcf-d432218764c0" id="sec.164-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a substance incidentally derived from—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fe2bc945-77e5-497a-8562-e68fbfa9949b" id="sec.164-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the process called carbon dioxide capture, transport and geological storage, also called carbon capture and storage; or</txt></block></li><li guid="_6c71e277-b42a-490b-bef2-f57b6e4e8520" id="sec.164-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">GHG storage; or</txt></block></li></list></block></li><li guid="_1cd93712-7dd6-4207-befc-62650d42cd5c" id="sec.164-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a detection agent prescribed under a regulation at the rate or concentration prescribed under a regulation.</txt></block></li></list><note guid="_def038be-00d2-40d4-81ec-c897a74eabe0" id="sec.164-note" type="example"><heading guid="_d5c34f63-7964-4079-aff9-ec969fc178d9" id="sec.164-note-he">Note—</heading><block><txt break.before="1">A stream is a GHG stream only if it is a stream of carbon dioxide or a substance that overwhelmingly consists of carbon dioxide. See <intref check="valid" refid="sec.12" target.guid="_a1370cf9-45f5-4d33-9ea0-422705c805d6">section 12</intref> (What is a <defterm guid="_6d413a32-a1a2-4bc7-b1c8-c7f1340a5065" type="mention">GHG stream</defterm>).</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_f5f13623-0ae8-4f52-bfe9-4393de82e4ee" id="sec.165" provision.type="other" spent.amends="0"><no>165</no><heading guid="_a7693676-220f-4e4e-892c-1c6b9eef849f" id="sec.165-he"><legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref> authorisation required for taking or interference with water</heading><block><txt break.before="1">A GHG lease holder can not take or interfere with water as defined under the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref> unless the taking or interference is authorised under that Act.</txt><note guid="_ff424ffd-d01a-4744-bfb0-7bae8b10a068" id="sec.165-note" type="example"><heading guid="_68e0603e-2c96-432d-9516-803476f40d90" id="sec.165-note-he">Note—</heading><block><txt break.before="1">For relevant <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref> provisions, see <legref check="valid" jurisd="QLD" refid="sec.19" target.doc.id="act-2000-034" target.guid="_af12c90e-feca-40d3-a70e-f57ea45e1f75" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act">sections 19</legref> and <legref check="valid" jurisd="QLD" refid="sec.808" target.doc.id="act-2000-034" target.guid="_472adce7-d425-4e58-a52d-7ff9b203f95e" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act">808</legref> of that Act.</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_e49e30b8-33d2-46f5-a812-37d2a1db8c4d" id="sec.166" provision.type="other" spent.amends="0"><no>166</no><heading guid="_0eb1d238-684e-4d86-bf4a-9b403272de32" id="sec.166-he">Obligation to consult with particular owners and occupiers</heading><subclause affected.by.uncommenced="0" guid="_eafef393-bbc1-49f7-975d-0db1e91f1b95" id="sec.166-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A GHG lease holder must consult or use reasonable endeavours to consult with each owner and occupier of private or public land on which authorised activities for the lease are proposed to be carried out or are being carried out.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_01f99bfd-fa14-449a-8899-586ce1765951" id="sec.166-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The consultation must be about—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_49b0a4a6-b4bf-4241-98e3-b9ce11077015" id="sec.166-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">access; and</txt></block></li><li guid="_43367f8e-5db1-4431-ad82-9a13bde74a4e" id="sec.166-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the carrying out of authorised activities for the GHG lease (including, for example, crossing access land for the lease) to the extent they relate to the owners and occupiers; and</txt></block></li><li guid="_1bf8bc9c-31d0-4f70-bdbd-73f0a086be63" id="sec.166-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the GHG lease holder’s compensation liability to the owners or occupiers.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0cb3af94-b931-49e2-aba0-1c48f97a4af5" id="sec.167" provision.type="other" spent.amends="0"><no>167</no><heading guid="_2a5c4d76-a6ce-4320-be33-721ca9772490" id="sec.167-he">Obligation to commence GHG stream storage</heading><block><txt break.before="1">A GHG lease holder must start GHG stream storage under the GHG lease on or before the later of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_211b0579-21fb-4790-8131-12d1a9683715" id="sec.167-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the end of 5 years after the GHG lease takes effect;</txt></block></li><li guid="_d65bdbe7-66fe-4e21-9c69-e6aa4d6786cf" id="sec.167-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any storage commencement day for the GHG lease.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_bdd5a418-bb5c-4838-a58a-e0f9740b46b0" id="sec.168" provision.type="other" spent.amends="0"><no>168</no><heading guid="_9f79c1d2-24e5-4d5a-8b01-dac91dda99d3" id="sec.168-he">Annual rent</heading><subclause affected.by.uncommenced="0" guid="_7d74657f-7a30-4c48-8158-e0f5a641bb92" id="sec.168-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A GHG lease holder must pay the State the annual rent as prescribed under a regulation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_80163b73-20b6-4af2-86fa-afb5123e088b" id="sec.168-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The annual rent must be paid in the way, and on or before the day, prescribed under a regulation.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_77fecc7d-2cf6-414c-a9de-f446e55eaee1" id="sec.169" provision.type="other" spent.amends="0"><no>169</no><heading guid="_39157af9-2ca4-40cb-b8b0-981f8d51eb4d" id="sec.169-he">Civil penalty for non-payment of annual rent</heading><subclause affected.by.uncommenced="0" guid="_e7c1f104-efe1-44ac-8414-fd77642c755e" id="sec.169-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a GHG lease holder does not pay the annual rent as required under <intref check="valid" refid="sec.168" target.guid="_bdd5a418-bb5c-4838-a58a-e0f9740b46b0">section 168</intref>, the holder must also pay the State a civil penalty.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_01867494-0520-4269-aa99-dc0087b10e4f" id="sec.169-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The amount of the penalty is 15% of the rent.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1c796cc6-5ac2-4cb8-b882-cc215f51fa40" id="sec.169-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The penalty—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_86df4290-9d0e-4bf9-b56d-2ccb13d164c2" id="sec.169-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must be paid on the day after the last day for payment of the rent; and</txt></block></li><li guid="_77557e9e-473a-4891-bb90-892f416501f0" id="sec.169-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is still payable even if the holder later pays the rent.</txt></block></li></list><note guid="_189d8759-675d-46a0-9172-4c5275336ae2" id="sec.169-ssec.3-note" type="example"><heading guid="_4175ee45-7cfe-46e6-bfa2-8c31f89549b7" id="sec.169-ssec.3-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.372" target.guid="_cdf19c9f-040c-4850-bb53-64da3212970f">section 372</intref> (Interest on amounts owing to the State).</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0ae4bf5b-a3d2-46aa-8a5c-8001c4c30daf" id="sec.170" provision.type="other" spent.amends="0"><no>170</no><heading guid="_6ece6450-4edd-4fcd-9120-bdc61917c71b" id="sec.170-he">Requirement to have development plan</heading><block><txt break.before="1">The holder of a GHG lease must have a development plan for the lease.</txt></block></clause><clause affected.by.uncommenced="0" guid="_46188fc6-cea2-4015-bdeb-5a01665e4140" id="sec.171" provision.type="other" spent.amends="0"><no>171</no><heading guid="_ed9370ea-2915-4feb-b3e6-500a0b8b882e" id="sec.171-he">Compliance with development plan</heading><block><txt break.before="1">A GHG lease holder must comply with the development plan for the lease.</txt></block></clause><clause affected.by.uncommenced="0" guid="_909d8642-9df9-4d09-aa4e-e3bfcc1826ea" id="sec.172" provision.type="other" spent.amends="0"><no>172</no><heading guid="_9239bce4-2def-4d19-ab54-6d96685f95a9" id="sec.172-he">Obligation to give proposed later development plan</heading><subclause affected.by.uncommenced="0" guid="_3a61a104-8081-40bf-a5b2-a56502b42359" id="sec.172-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section imposes an obligation on a GHG lease holder to give the Minister a proposed later development plan for the lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_17cbceaf-55d5-49eb-b697-055c98a28277" id="sec.172-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The obligation is complied with only if the proposed later development plan—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9f16dc5f-c193-4832-ae50-e9e9935751f9" id="sec.172-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">complies with the later development plan requirements; and</txt></block></li><li guid="_a8b446a4-d1a7-45f6-b883-a905ebbf3a9e" id="sec.172-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is accompanied by the relevant fee.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d1a4a315-10c1-4125-afe0-32b81f76c7d9" id="sec.172-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A proposed later development plan must be given to the Minister—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e0042e49-bb4f-4491-bd90-c804170d8bbb" id="sec.172-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">at least 40 but no more than 100 business days before the end of the plan period for its current development plan (the <defterm guid="_f63fb2e9-b284-4d9d-bfd7-87a8d648ed1d" id="sec.172-ssec.3-def.currentplanperiod" type="definition">current plan period</defterm>); or</txt></block></li><li guid="_57901a12-2999-4cf5-b92f-132b571521c0" id="sec.172-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">as soon as practicable after the holder proposes or becomes aware of a significant change to the nature and extent of an authorised activity that is not already dealt with under the current development plan for the GHG lease.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_86ba8fc3-4e78-4697-9031-7c3bb37ed5e4" id="sec.172-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, if before the end of the current plan period a decision is made to refuse to approve a proposed later development plan given under <intref check="valid" refid="sec.172-ssec.3" target.guid="_d1a4a315-10c1-4125-afe0-32b81f76c7d9">subsection (3)</intref>, the holder may within the period give the Minister another proposed later development plan.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d7c91d6b-e111-42b2-8f94-541016db9f26" id="sec.172-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the holder does not give the Minister any proposed later development plan before the end of the current plan period or if <intref check="valid" refid="sec.172-ssec.4" target.guid="_86ba8fc3-4e78-4697-9031-7c3bb37ed5e4">subsection (4)</intref> applies and the holder does not give the Minister another proposed later development plan within the current plan period—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e4f2db1d-8634-405c-bd4d-37b7d360bdec" id="sec.172-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the Minister must give the holder a notice requiring the holder to give the Minister a proposed later development plan for the GHG lease within 40 business days after the giving of the notice; and</txt></block></li><li guid="_240ebc16-199f-40b0-bf4c-ad3011b19688" id="sec.172-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder must comply with the requirement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f8cfb79d-67d6-4acf-b6c6-adfecb02eb3e" id="sec.172-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_6fb9ea08-9f15-47d8-b4ab-85dc555599dc" id="sec.172-ssec.6-def.relevantfee_"><txt break.before="1"><defterm guid="_f0e58738-2df8-4eb5-b88e-219c87376f10" id="sec.172-ssec.6-def.relevantfee" type="definition">relevant fee</defterm>, for the giving of the proposed plan, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_44709755-55db-41d6-b769-8121f680e44d" id="sec.172-ssec.6-def.relevantfee-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the proposed plan is given within the time required under <intref check="valid" refid="sec.172-ssec.3" target.guid="_d1a4a315-10c1-4125-afe0-32b81f76c7d9">subsection (3)</intref>—the fee prescribed under a regulation; or</txt></block></li><li guid="_e40cc969-bc90-4188-9322-0ad78999ee0b" id="sec.172-ssec.6-def.relevantfee-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the proposed plan is given after the time required under <intref check="valid" refid="sec.172-ssec.3" target.guid="_d1a4a315-10c1-4125-afe0-32b81f76c7d9">subsection (3)</intref> and—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_33a3b5b6-d519-4810-a1c0-38cc60ae5e93" id="sec.172-ssec.6-def.relevantfee-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">if it is given under <intref check="valid" refid="sec.172-ssec.4" target.guid="_86ba8fc3-4e78-4697-9031-7c3bb37ed5e4">subsection (4)</intref>—nil; or</txt></block></li><li guid="_81d24cbc-27b8-40c0-a577-3d74d4f87412" id="sec.172-ssec.6-def.relevantfee-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if it is not given under <intref check="valid" refid="sec.172-ssec.4" target.guid="_86ba8fc3-4e78-4697-9031-7c3bb37ed5e4">subsection (4)</intref>—an amount that is 10 times the prescribed fee.</txt></block></li></list></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c8f7e3bd-b953-41dd-b59a-a7cbe56021d9" id="sec.173" provision.type="other" spent.amends="0"><no>173</no><heading guid="_807e0943-efbb-46c0-abc2-d3b7a7596be8" id="sec.173-he">Consequence of failure to comply with notice to give proposed later development plan</heading><subclause affected.by.uncommenced="0" guid="_ad2742c6-5eaf-4ca5-895a-e6bb77c9cd4d" id="sec.173-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a GHG lease holder does not comply with a requirement under <intref check="valid" refid="sec.172" target.guid="_909d8642-9df9-4d09-aa4e-e3bfcc1826ea">section 172</intref><intref check="valid" refid="sec.172-ssec.5" target.guid="_d7c91d6b-e111-42b2-8f94-541016db9f26">(5)</intref><intref check="valid" refid="sec.172-ssec.5-para1.a" target.guid="_e4f2db1d-8634-405c-bd4d-37b7d360bdec">(a)</intref>, the lease is cancelled.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3995f02c-60d4-4764-be21-3b23d7887fa6" id="sec.173-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the cancellation does not take effect until the Minister gives the holder a notice stating that the GHG lease has been cancelled because of the operation of <intref check="valid" refid="sec.173-ssec.1" target.guid="_ad2742c6-5eaf-4ca5-895a-e6bb77c9cd4d">subsection (1)</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_df4dc2db-39e5-4e24-a067-e364543ace98" id="sec.173A" provision.type="other" spent.amends="0"><no>173A </no><heading guid="_f008d070-b602-4b6d-837e-36d3f66abeb4" id="sec.173A-he">Power to impose or amend condition if changed holder of GHG lease</heading><subclause affected.by.uncommenced="0" guid="_2d9e68e5-0c0d-4fe9-abc3-40923ab15cf9" id="sec.173A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if 1 of the following changes happens—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1da15ef1-a19a-4981-af1d-8a4cd0b162a1" id="sec.173A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an entity starts or stops controlling the holder of a GHG lease under the Corporations Act, section 50AA; </txt></block></li><li guid="_6c1c6ec6-af43-4287-9941-f73c127324d3" id="sec.173A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder of a GHG lease starts or stops being a subsidiary of a corporation under the Corporations Act, section 46.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_47143772-105f-42f6-932d-6ef87d2d02ff" id="sec.173A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister may consider whether, after the change, the holder of the GHG lease has the financial and technical resources to comply with the conditions of the GHG lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_588010ef-f843-4f69-bee6-05efc47618bd" id="sec.173A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the Minister considers the holder of the GHG lease may not have the financial and technical resources to comply with conditions of the GHG lease, the Minister may impose another condition on, or amend a condition of, the GHG lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fb144262-5ee3-4895-aaaf-713d998f7051" id="sec.173A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the Minister believes a change mentioned in subsection (1) may have happened, the Minister may require the holder of the GHG lease to give the Minister information or a document about whether or not the change has happened.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_df490a06-1fa0-43bf-9103-b0429b43ccf7" id="sec.173A-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Before deciding to impose another condition on, or amend a condition of, the GHG lease under subsection (3), the Minister may require the holder of the GHG lease to give the Minister information or a document the Minister requires to make the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_48564b12-f41c-42a1-a213-86f621c6ba2b" id="sec.173A-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">A requirement under subsection (4) or (5) must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_684820bf-e434-4857-b676-05e6bf967361" id="sec.173A-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be made by notice given to the holder; and</txt></block></li><li guid="_2b0970f6-6325-4b94-ae46-e23f59e282e6" id="sec.173A-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state a period of at least 10 business days within which the holder must comply with the requirement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3810a8c7-b0af-4603-a171-143e96e26e10" id="sec.173A-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">Before deciding to impose another condition on, or amend a condition of, the GHG lease under subsection (3), the Minister must give the holder of the lease a notice stating—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cec41c85-0900-4b7e-a28d-cdec9badace5" id="sec.173A-ssec.7-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the proposed decision; and</txt></block></li><li guid="_52d99a68-a04d-4e2f-8515-d60329480073" id="sec.173A-ssec.7-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the reasons for the proposed decision; and</txt></block></li><li guid="_3509bae4-f6c7-4071-843a-30195cefbb2b" id="sec.173A-ssec.7-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that the holder may, within 10 business days after the notice is given, make submissions to the Minister about the proposed decision.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_66b0024a-cfcf-4c79-96e1-18b48959baf9" id="sec.173A-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">The Minister may extend the period mentioned in subsection (6)(b) or (7)(c) by notice given to the holder of the GHG lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ad40e733-dc2e-4be2-9084-3a36da5ef33c" id="sec.173A-ssec.9" provision.type="other"><no>(9)</no><block><txt break.before="0">In deciding whether to impose another condition on, or amend a condition of, the GHG lease under subsection (3), the Minister—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9bf889a0-88b8-4594-aa8a-f9e90264131e" id="sec.173A-ssec.9-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must consider information or a document, if any, given under subsection (6)(b) or (7)(c); and</txt></block></li><li guid="_826de42d-dd84-413a-a3d6-4badaa02addd" id="sec.173A-ssec.9-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">may consider any other matter the Minister considers relevant.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a9f53e9f-3952-4dfb-9b4e-5bd6dffb13b0" id="sec.173A-ssec.10" provision.type="other"><no>(10)</no><block><txt break.before="0">If the Minister decides to impose another condition on, or amend a condition of, the GHG lease under subsection (3), the Minister must, as soon as practicable after making the decision, give the holder a notice stating the decision and the reasons for the decision.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_cde520fc-abfb-4781-ad77-22e376231a23" id="ch.3-pt.7"><no>Part 7</no><heading guid="_426cb98c-b3e0-44f9-95e4-9c8e46bb60d7" id="ch.3-pt.7-he">Surrenders</heading><clause affected.by.uncommenced="0" guid="_326c7813-f962-45d2-93e2-4c95ae2cef14" id="sec.174" provision.type="other" spent.amends="0"><no>174</no><heading guid="_e54cbe9f-f721-4ee9-9ffb-ab092a5bf0e7" id="sec.174-he">When surrender is permitted</heading><block><txt break.before="1">A GHG lease holder may surrender the lease only if, under this part—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e7cf6939-8491-4baf-97d1-76b0c949a0bf" id="sec.174-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an application (a <defterm guid="_e827261e-b07b-4a0d-9f26-4fdfaf1314ab" id="sec.174-def.surrenderapplication" type="definition">surrender application</defterm>) has been made for approval of the surrender; and</txt></block></li><li guid="_d08ec1f1-42af-4a9b-bc32-858323d4d926" id="sec.174-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the surrender has been approved.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_dd986ed8-a04a-40ec-a0e2-7a443973a7f3" id="sec.175" provision.type="other" spent.amends="0"><no>175</no><heading guid="_f6152634-7d20-40cd-84b7-f888d5698a17" id="sec.175-he">Part of GHG lease area can not be surrendered</heading><block><txt break.before="1">A GHG lease holder can not surrender part of the lease’s area.</txt></block></clause><clause affected.by.uncommenced="0" guid="_59722a5c-66e2-4e99-990e-8684129a764f" id="sec.176" provision.type="other" spent.amends="0"><no>176</no><heading guid="_acd3b702-2550-44a2-aeea-d94b6112c500" id="sec.176-he">Timing of surrender application</heading><subclause affected.by.uncommenced="0" guid="_c82bfd37-f295-4e7a-9605-726d5c8c456b" id="sec.176-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e639bf1a-1311-46a3-9097-f63bcde8dfed" id="sec.176-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">GHG stream injection under a GHG lease ceases; and</txt></block></li><li guid="_b2016d27-e5d4-4b65-a1d8-9729f7dc6bca" id="sec.176-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">all GHG wells in the GHG lease’s area have been decommissioned in the way required under <intref check="valid" refid="sec.267" target.guid="_0f9dc122-df5d-4fa0-90ae-718fa0e66f51">section 267</intref>;</txt></block></li></list><txt break.before="1">the GHG lease holder must make a surrender application for the lease within 60 business days.</txt></block><penalty guid="_38492f71-7053-48cb-8cf3-ca59c60549d6" id="sec.176-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_3806ae51-889a-408b-9293-858da6b21249" id="sec.176-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The GHG lease holder can not make a surrender application for the lease before all of the events mentioned in <intref check="valid" refid="sec.176-ssec.1" target.guid="_c82bfd37-f295-4e7a-9605-726d5c8c456b">subsection (1)</intref> have happened.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_399c33f1-3b79-4467-9a33-9817bf62f894" id="sec.177" provision.type="other" spent.amends="0"><no>177</no><heading guid="_40096c29-ea26-43cf-bf0b-19b8ba68bd4a" id="sec.177-he">Requirements for making surrender application</heading><subclause affected.by.uncommenced="0" guid="_5babab78-5cbe-4b01-ba70-18e2700c3b60" id="sec.177-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A surrender application must be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_521d3405-e13e-43ba-853a-b3b1e231ecd9" id="sec.177-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">made to the Minister in the approved form; and</txt></block></li><li guid="_87089710-d8ff-4167-a649-1de5bb5ec3f8" id="sec.177-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">accompanied by the fee prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8b06d175-5f8a-42c8-9422-458cf0dc3260" id="sec.177-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A surrender application must also be accompanied by a report by the applicant stating each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f1499a83-42b4-4aaf-9e52-690fa047ebf2" id="sec.177-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the authorised activities for the GHG lease carried out on the area the subject of the application;</txt></block></li><li guid="_2b7aeec6-d4cd-4417-a3b4-8e2a3ae1670e" id="sec.177-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the results of the activities;</txt></block></li><li guid="_a15e6818-076e-412d-a3db-eddfa57ec6f8" id="sec.177-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the applicant’s modelling of the behaviour of GHG streams injected under the GHG lease;</txt></block></li><li guid="_0a6aa023-9c11-413b-8b7e-270fb6aeee20" id="sec.177-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">information relevant to the modelling and the applicant’s analysis of the information;</txt></block></li><li guid="_e2364e70-3daa-4402-8bbb-4549df75fca2" id="sec.177-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the applicant’s assessment of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7f8dc5d5-20af-4850-ab1e-08b68fc29bc5" id="sec.177-ssec.2-para1.e-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the behaviour of GHG streams injected under the GHG lease; and</txt></block></li><li guid="_b4b621e2-873d-41c8-bada-87399b2fb887" id="sec.177-ssec.2-para1.e-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the expected migration pathway or pathways of the GHG streams; and</txt></block></li><li guid="_4df276f4-b42e-4580-a4d9-13ad0d15d417" id="sec.177-ssec.2-para1.e-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the short-term and long-term consequences of the migration;</txt></block></li></list></block></li><li guid="_219a7ab4-732e-444d-a673-8dbad1d80891" id="sec.177-ssec.2-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">the applicant’s suggestions for the approach to be taken by the State if the surrender is approved, to monitor and verify the behaviour of the GHG streams;</txt></block></li><li guid="_6d1be0a0-31c3-46c8-8ecc-b7a133f3ad15" id="sec.177-ssec.2-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">any other information prescribed under a regulation.</txt></block></li></list></block><penalty guid="_e2a97f32-c2d1-4422-8b90-83f606af9eab" id="sec.177-ssec.2-pen"><block><txt break.before="1">Maximum penalty for <intref check="valid" refid="sec.177-ssec.2" target.guid="_8b06d175-5f8a-42c8-9422-458cf0dc3260">subsection (2)</intref>—500 penalty units.</txt></block></penalty></subclause></clause><clause affected.by.uncommenced="0" guid="_7a329607-b634-4640-ad26-3d815a45e6c3" id="sec.178" provision.type="other" spent.amends="0"><no>178</no><heading guid="_6d818340-fd0f-4c5f-af66-568c66257e1a" id="sec.178-he">Minister may require further report or work for surrender of GHG lease</heading><subclause affected.by.uncommenced="0" guid="_c82fe5fe-497e-472d-9446-e1dbd78b097b" id="sec.178-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Before deciding whether to approve the surrender of a GHG lease the Minister may by notice require the applicant to do either or both of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_372b93b2-4a7d-421a-9524-3bac131a9402" id="sec.178-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">give the Minister a report about whether the risks associated with GHG stream storage under the GHG lease have been reduced as much as is reasonably practicable;</txt></block></li><li guid="_67d74168-d3cd-43fd-bb2e-d196abd0703c" id="sec.178-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">carry out stated work to reduce the risks.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d516210b-abb9-4f74-ae99-74ba835629c1" id="sec.178-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The applicant must comply with the requirement.</txt></block><penalty guid="_14d497a6-071d-4e4f-9668-7ac038fa4da0" id="sec.178-ssec.2-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_abff448a-d349-49cf-9878-b4b7517d046c" id="sec.178-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Until the applicant complies with the requirement, the Minister need not decide the application.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f33d338a-8e12-489a-9cd3-4fde82523365" id="sec.179" provision.type="other" spent.amends="0"><no>179</no><heading guid="_5a2eb0ba-4b02-40bd-baae-60a76352d2cb" id="sec.179-he">Deciding application</heading><subclause affected.by.uncommenced="0" guid="_37d594e1-15ca-424e-a80c-08a322354013" id="sec.179-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may approve a surrender only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5347f242-0f08-4f3a-aec8-2f539bcf54ee" id="sec.179-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">up to the day the application was made, the holder had submitted all reports required to be submitted under this Act; and</txt></block></li><li guid="_76fcdb16-e39d-4f5b-9143-a67031f7629a" id="sec.179-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Minister considers the risks associated with GHG stream storage under the GHG lease have been reduced as much as is reasonably practicable; and</txt></block></li><li guid="_7bbcdf4f-3716-47ca-b69d-327f15c18a08" id="sec.179-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">all of the relevant environmental authority has been cancelled or surrendered.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a9a84801-1727-4219-b1dc-9a319afb010b" id="sec.179-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In deciding whether to approve a surrender the Minister must consider the extent to which the applicant has complied with the conditions of the GHG lease.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_cb5b1134-b51f-4458-af85-9894d21b9b8b" id="sec.180" provision.type="other" spent.amends="0"><no>180</no><heading guid="_c286fba0-c508-47c4-87cc-8387c980028c" id="sec.180-he">Notice and taking effect of decision</heading><subclause affected.by.uncommenced="0" guid="_d40b4aae-8948-497e-a153-7395f878ee9b" id="sec.180-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the Minister decides to approve a surrender, the Minister must give the applicant notice of the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0951826c-1cd0-4bdb-b634-b9037da91d84" id="sec.180-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The surrender takes effect on the day after the decision is made.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_64889718-d2d5-416a-8472-95bbc420d53a" id="sec.180-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the Minister decides to refuse a surrender, the Minister must give the applicant an information notice about the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_62c0d799-9bf5-42d1-b507-675de0baec5f" id="sec.181" provision.type="other" spent.amends="0"><no>181</no><heading guid="_037970df-f54a-4451-b297-20d8552dab7f" id="sec.181-he">Responsibility for injected GHG streams after decommissioning</heading><subclause affected.by.uncommenced="0" guid="_2e4b30de-ce71-4fc9-8f6b-7d98b7245cd6" id="sec.181-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies on the surrender of a GHG lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5b48d50a-9740-47be-bd04-d5949ad03f6c" id="sec.181-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Any GHG stream injected into a GHG storage reservoir in the former GHG lease’s area in compliance with <intref check="valid" refid="sec.164" target.guid="_f56f6fdd-2cfc-412f-b56a-ff27baaf01e3">section 164</intref> becomes the property of the State.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_76959860-34d4-4433-8a0d-561ae1261501" id="sec.181-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0"><intref check="valid" refid="sec.181-ssec.2" target.guid="_5b48d50a-9740-47be-bd04-d5949ad03f6c">Subsection (2)</intref> applies despite—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_becdc8aa-a4e8-4ad6-988b-f4330b5ef471" id="sec.181-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the GHG stream being on or part of land owned by someone else; or</txt></block></li><li guid="_140cbdbb-3065-4091-b36b-e0fd9ea078ce" id="sec.181-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the sale or other disposal of the land.</txt></block></li></list></block></subclause></clause></part></chapter><chapter affected.by.uncommenced="0" guid="_faefc638-342e-43b0-a5ed-6ae7a9f9a690" id="ch.4"><no>Chapter 4</no><heading guid="_dcbf3d1d-6337-4a75-bde3-16fd08b1f0d9" id="ch.4-he">Coordination with particular authorities under other resource Acts</heading><part affected.by.uncommenced="0" guid="_59812e9d-451d-4d79-ab20-0fd9eb3951f5" id="ch.4-pt.1"><no>Part 1</no><heading guid="_0886e7be-b5ad-4139-878e-63f3e90d165c" id="ch.4-pt.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_c7817b2c-1608-4582-b68b-f5e5344a3b0f" id="sec.182" provision.type="other" spent.amends="0"><no>182</no><heading guid="_091e98fe-fc6d-4ad3-b4bf-8dc25141eb62" id="sec.182-he">Relationship with chs 2, 3 and 5</heading><subclause affected.by.uncommenced="0" guid="_1f249628-52d9-457f-bfbe-58fa9c52a0e7" id="sec.182-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Requirements and restrictions under this chapter relating to the granting of a GHG tenure apply as well as any relevant requirements under <intref check="valid" refid="ch.2" target.guid="_60f42d8e-8fdb-4c76-a1e6-d0c7ad27b9d4">chapter 2</intref>, <intref check="valid" refid="ch.3" target.guid="_4c6bae05-4d64-4dbf-a4f3-a2736db63437">3</intref> or <intref check="valid" refid="ch.5" target.guid="_c200371d-7276-455f-ab31-e74d811368e1">5</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_67f8c944-67a1-468b-af40-5a01c5f16ccc" id="sec.182-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If this chapter imposes a requirement for or a restriction on the granting of a GHG tenure, it can not be granted if the restriction applies or if the requirement has not been complied with.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a1215485-05f7-4a32-8c0e-6f1bab4b6f54" id="sec.182-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If a provision of this chapter conflicts with a provision of <intref check="valid" refid="ch.2" target.guid="_60f42d8e-8fdb-4c76-a1e6-d0c7ad27b9d4">chapter 2</intref>, <intref check="valid" refid="ch.3" target.guid="_4c6bae05-4d64-4dbf-a4f3-a2736db63437">3</intref> or <intref check="valid" refid="ch.5" target.guid="_c200371d-7276-455f-ab31-e74d811368e1">5</intref>, the provision of this chapter prevails to the extent of the inconsistency.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_10dc4298-0745-421a-b137-fb8c8db9c692" id="sec.182-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">This chapter does not otherwise limit or affect the requirements of <intref check="valid" refid="ch.2" target.guid="_60f42d8e-8fdb-4c76-a1e6-d0c7ad27b9d4">chapter 2</intref>, <intref check="valid" refid="ch.3" target.guid="_4c6bae05-4d64-4dbf-a4f3-a2736db63437">3</intref> or <intref check="valid" refid="ch.5" target.guid="_c200371d-7276-455f-ab31-e74d811368e1">5</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e89b4996-1faf-4b88-b713-83de39bef360" id="sec.182-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0"><intref check="valid" refid="sec.182-ssec.6" target.guid="_1eea17d1-4f1d-44f9-a149-18e7882b8346">Subsection (6)</intref> applies if this chapter imposes a requirement for or a restriction on the carrying out of an authorised activity for a GHG authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1eea17d1-4f1d-44f9-a149-18e7882b8346" id="sec.182-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">Despite <intref check="valid" refid="ch.2" target.guid="_60f42d8e-8fdb-4c76-a1e6-d0c7ad27b9d4">chapters 2</intref>, <intref check="valid" refid="ch.3" target.guid="_4c6bae05-4d64-4dbf-a4f3-a2736db63437">3</intref> and <intref check="valid" refid="ch.5" target.guid="_c200371d-7276-455f-ab31-e74d811368e1">5</intref>, the activity is not an authorised activity for the GHG authority while the restriction applies or if the requirement has not been complied with.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2727cfb8-d940-4e5e-87af-f59b61ef2cb2" id="sec.183" provision.type="other" spent.amends="0"><no>183</no><heading guid="_e98949cd-0b1f-4b9f-871f-a994e6bfc890" id="sec.183-he">What is an <defterm guid="_88748889-5f96-4f20-8275-bf7ca38de060" type="mention">overlapping resource authority</defterm></heading><subclause affected.by.uncommenced="0" guid="_718b7759-2178-4436-b76f-fc4c22e3e302" id="sec.183-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An <defterm guid="_cd465b80-52c4-4c5f-9553-310100747463" id="sec.183-def.overlappingauthority" type="definition">overlapping authority</defterm>, for a GHG authority, is any authority of the following types all or part of the area of which is in the GHG authority’s area—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dd7e8512-92f5-4e34-a32f-605c30d681b2" id="sec.183-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an exploration authority (non-GHG);</txt></block></li><li guid="_d314d3f8-7bd2-49fd-8948-d5cb32f6da55" id="sec.183-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a geothermal lease;</txt></block></li><li guid="_51c83ede-970f-4294-8adb-1c0154d0a550" id="sec.183-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a mining lease;</txt></block></li><li guid="_9587e019-9d86-4cff-b77e-965553f9d80d" id="sec.183-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a petroleum lease.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1887b459-216a-4729-95d4-b753ad6d10d0" id="sec.183-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An <defterm guid="_d5e95900-5089-437a-b9cc-e3cba6075406" id="sec.183-def.overlappingauthority-oc.2" type="definition">overlapping authority</defterm>, for a proposed GHG authority, is another authority of a type mentioned in <intref check="valid" refid="sec.183-ssec.1" target.guid="_718b7759-2178-4436-b76f-fc4c22e3e302">subsection (1)</intref> (the <defterm guid="_cc2bc683-58f4-4902-aea6-f445b763c5a5" id="sec.183-def.otherauthority" type="definition">other authority</defterm>) all or part of the area of which will if the proposed GHG authority is granted be in the other authority’s area.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c566709e-a7cf-40ae-920e-5f4a37016cf9" id="sec.184" provision.type="other" spent.amends="0"><no>184</no><heading guid="_5bcaeb47-ef00-4d86-96d1-00b2a467df97" id="sec.184-he">What is an <defterm guid="_fdd07856-0915-4606-b64a-752417c4b883" type="mention">exploration authority (non-GHG)</defterm></heading><block><deflist><block><txt break.before="1">An <defterm guid="_9760ccbd-c1cb-431a-8748-d23d1fac8c2f" id="def.explorationauthoritynonGHG" type="definition">exploration authority (non-GHG) </defterm>is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7d2b3da6-2057-4761-bca8-1fcb44771841" id="sec.184-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an ATP; or</txt></block></li><li guid="_020b523f-8739-44e6-9c3b-7b3aaf22db99" id="sec.184-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any of the following under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ce723207-6f4c-4b4d-9e63-6fddb1193d78" id="sec.184-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a mining claim;</txt></block></li><li guid="_ac7d6886-4bea-4f0e-819f-ba2bbcbaf73d" id="sec.184-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">an exploration permit;</txt></block></li><li guid="_224e45b9-ca6e-4f5d-b50a-d062deed1b4d" id="sec.184-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">a mineral development licence; or</txt></block></li></list></block></li><li guid="_6cfbdb72-51a3-4277-83fd-cefbcf705bc1" id="sec.184-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a geothermal permit.</txt></block></li></list></block></deflist></block></clause><clause affected.by.uncommenced="0" guid="_e41cad80-e65c-4e89-95c1-95e13c26fcc2" id="sec.185" provision.type="other" spent.amends="0"><no>185</no><heading guid="_a7895055-e5c5-4ad7-9f8a-2c0a197c0861" id="sec.185-he">Relationship with other <legref check="invalid" jurisd="QLD" type="act">resource Acts</legref> and overlapping resource authorities</heading><block><txt break.before="1">Subject to the other provisions of this chapter and chapters 2, 3 and 5, another <legref check="invalid" jurisd="QLD" type="act">resource Act</legref> or an authority, tenement or tenure under a <legref check="invalid" jurisd="QLD" type="act">resource Act</legref> does not limit or otherwise affect—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4473b064-61a9-4021-a186-a2b4ce4e5fc8" id="sec.185-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the power under this Act to grant a GHG authority over land in the area of an overlapping authority for the proposed GHG authority; or</txt></block></li><li guid="_64d44dfe-0bfe-412b-9165-2eec543cb41b" id="sec.185-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the carrying out of authorised activities for a GHG authority.</txt></block></li></list></block></clause></part><part affected.by.uncommenced="0" guid="_34087819-2d45-4d5f-b488-87c8e6b49923" id="ch.4-pt.2"><no>Part 2</no><heading guid="_772cf30c-f6ee-4693-80a3-fde1435d2267" id="ch.4-pt.2-he">Coordination arrangements for GHG leases</heading><clause affected.by.uncommenced="0" guid="_780d2fa6-1285-4a39-bfdf-679d36f6ee8f" id="sec.186" provision.type="other" spent.amends="0"><no>186</no><heading guid="_2798694c-bace-41dd-9131-4ab3c50f07cd" id="sec.186-he">GHG coordination arrangements that may be made</heading><subclause affected.by.uncommenced="0" guid="_7e9850ac-b9ba-474d-84df-d456c7389b64" id="sec.186-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The holder of a GHG lease may make an arrangement with the holder of an overlapping authority for the GHG lease about GHG stream storage under the lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_43a84447-5d79-4d82-8265-8e2068af03bb" id="sec.186-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A person who proposes to enter into a lease of a type mentioned in <intref check="valid" refid="sec.186-ssec.1" target.guid="_7e9850ac-b9ba-474d-84df-d456c7389b64">subsection (1)</intref> may enter into an arrangement mentioned in <intref check="valid" refid="sec.186-ssec.1" target.guid="_7e9850ac-b9ba-474d-84df-d456c7389b64">subsection (1)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_53526562-4ccb-4261-88d0-abde9493b6ca" id="sec.186-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">An arrangement of a type mentioned in <intref check="valid" refid="sec.186-ssec.1" target.guid="_7e9850ac-b9ba-474d-84df-d456c7389b64">subsection (1)</intref> that under <intref check="valid" refid="sec.189" target.guid="_2392cfc4-ef81-43bf-9213-532f2d7e7c23">section 189</intref>, has taken effect and has not ceased to operate according to its terms and has not been cancelled under this part is a <defterm guid="_e7bf5674-0793-488c-b200-3537aebbaf57" id="sec.186-def.GHGcoordinationarrangement" type="definition">GHG coordination arrangement</defterm>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1df88b42-9b0e-4ed0-b9df-17acff222b37" id="sec.186-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A lease or proposed lease of a type mentioned in <intref check="valid" refid="sec.186-ssec.1" target.guid="_7e9850ac-b9ba-474d-84df-d456c7389b64">subsection (1)</intref> is a <defterm guid="_661c3d48-40c6-46b0-9b58-96dba08431ce" id="sec.186-def.relevantlease" type="definition">relevant lease</defterm> for a GHG coordination arrangement.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_dfe31bff-c878-43c6-b797-6d39aacb3c0d" id="sec.187" provision.type="other" spent.amends="0"><no>187</no><heading guid="_2b92ef3f-2a11-428d-ad4b-6d8292dfc4fb" id="sec.187-he">Other provisions about and effect of GHG coordination arrangement</heading><subclause affected.by.uncommenced="0" guid="_2c6ff7da-bab4-4f3e-8083-c91e1f63099f" id="sec.187-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A GHG coordination arrangement may—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_72a0078d-b570-4796-9200-c4f110aa0c5d" id="sec.187-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be for any term; and</txt></block></li><li guid="_24ecbc9a-a53a-4a74-89b5-efba92a929af" id="sec.187-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">have more than 2 relevant leases; and</txt></block></li><li guid="_95f5f9ef-176e-4bee-bcfa-053c484c4b0b" id="sec.187-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">be included in, or form part of, a coordination arrangement under the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref> or a geothermal coordination arrangement under the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_26de5df4-df0d-4afc-a0c5-d778a9cd9117" id="sec.187-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A person other than the holder or proposed holder of a relevant lease may also be a party to the arrangement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b7edce43-3fad-4db5-b2cf-e377c2bcec30" id="sec.187-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A proposed GHG coordination arrangement has no effect unless it is approved by the Minister under <intref check="valid" refid="sec.189" target.guid="_2392cfc4-ef81-43bf-9213-532f2d7e7c23">section 189</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_78083c38-574b-4406-ae1a-4c792ee2d43f" id="sec.188" provision.type="other" spent.amends="0"><no>188</no><heading guid="_f1eca960-79a8-4a17-9b36-788a92644383" id="sec.188-he">Applying for ministerial approval of proposed GHG coordination arrangement</heading><subclause affected.by.uncommenced="0" guid="_3af1eeaf-f88c-4f55-a1bf-49c1d929cdc9" id="sec.188-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The parties to a proposed GHG coordination arrangement may jointly apply for approval of the arrangement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_78efab62-87d2-4cb3-96bf-6aeb390272aa" id="sec.188-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application must be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f1f0a6dc-3529-4f1a-85d4-be4691d09797" id="sec.188-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">made to the Minister in the approved form; and</txt></block></li><li guid="_afc76d6d-b00d-416e-a5c0-c91fc47e6881" id="sec.188-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">accompanied by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_10a2363b-4352-412a-8ac9-7d0f75d1f0bb" id="sec.188-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the original or a certified copy of the proposed arrangement; and</txt></block></li><li guid="_d113ab23-4665-4ff4-b685-9a5b6206a2ee" id="sec.188-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the fee prescribed under a regulation.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0e07e1c5-0300-498f-9e25-c6bbbcdc9074" id="sec.188-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the proposed arrangement is inconsistent with the current development plan for the GHG lease, the application must be accompanied by a proposed later development plan for the lease.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2392cfc4-ef81-43bf-9213-532f2d7e7c23" id="sec.189" provision.type="other" spent.amends="0"><no>189</no><heading guid="_3c8db78d-8828-48d4-b509-2cdbd8015460" id="sec.189-he">Ministerial approval of proposed GHG coordination arrangement</heading><subclause affected.by.uncommenced="0" guid="_c7cd961f-794d-4840-8660-213a65af8ee8" id="sec.189-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may approve the proposed arrangement only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_40f9f9b5-a497-4286-8d3c-ccceaa3533d3" id="sec.189-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the Minister is satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2f472bca-7c88-4d52-8bc8-5802caf1fa10" id="sec.189-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the arrangement clearly identifies the safety responsibilities of each party to the arrangement for the land the subject of the arrangement; and</txt></block></li><li guid="_be6f6258-e078-4345-9ff8-5ba8416bbc22" id="sec.189-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the spatial relationship between the relevant leases for the arrangement is appropriate; and</txt></block></li></list></block></li><li guid="_2349ccf2-b1b5-4f89-b40d-bcfad60c9ca6" id="sec.189-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for an application required to be accompanied by a proposed later development plan for a relevant lease—the proposed plan has been approved; and</txt></block></li><li guid="_f2e499b6-0a5d-495f-8bb3-cf898cf785b2" id="sec.189-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the arrangement is consistent with the purposes of this Act.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5bf22a8c-e093-4046-a894-dca67bc3577d" id="sec.189-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In considering whether to approve the proposed arrangement the Minister may have regard to any coordination arrangement or proposed coordination arrangement under the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref> or other agreement the Minister considers relevant.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3a844b11-8540-49dd-a286-0cb4d4a5df6a" id="sec.189-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister may refuse to approve a proposed GHG coordination arrangement that provides for a party to the arrangement to be granted a pipeline licence for a GHG stream pipeline if the Minister considers that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0dad44d4-3b3d-4326-b744-03fe2b20160c" id="sec.189-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">having regard to the requirements under the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref><legref check="valid" jurisd="QLD" refid="ch.4" target.doc.id="act-2004-025" target.guid="_bce3f736-0a5e-4ba6-b741-c213b453c013" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">chapter 4</legref>, the pipeline licence would not be granted if the party were to apply for it; or</txt></block></li><li guid="_62022b1c-4de5-4092-9da3-ebd2ae0bba04" id="sec.189-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">not enough information has been given to decide whether the licence should be granted; or</txt></block></li><li guid="_16d061ff-bfac-4648-8d89-ce33b7a06d4d" id="sec.189-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the spatial relationship between the GHG lease and an overlapping authority is not appropriate for a GHG coordination arrangement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e2dfb49f-634e-44e9-91ca-c5a62fbf73c6" id="sec.189-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If a relevant lease has not been granted, the approval does not take effect until the GHG lease takes effect.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3afe1f2a-5c66-4925-a283-fdc82c40ba20" id="sec.190" provision.type="other" spent.amends="0"><no>190</no><heading guid="_b30455db-e0d1-4723-8fd4-41ffea59b3a1" id="sec.190-he">Approval does not confer right to surrender or renew</heading><subclause affected.by.uncommenced="0" guid="_dc612532-bbe7-4dcd-ab3c-3ccc74746f8c" id="sec.190-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the term of a GHG coordination arrangement is longer than the current term of any relevant lease for the arrangement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_dbb6de17-e21c-4b93-a811-61a179163e16" id="sec.190-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">To remove any doubt, it is declared that the approval of the arrangement does not impose an obligation or create a right—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_18503515-7637-4caa-b2c1-44b2cf3628e0" id="sec.190-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to approve a surrender application for a GHG lease; or</txt></block></li><li guid="_d9a36a13-6591-410d-804c-e414149d878c" id="sec.190-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to renew any other type of relevant lease.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_ecea7daa-e9cf-49c7-8efd-ba3bad7d5212" id="sec.191" provision.type="other" spent.amends="0"><no>191</no><heading guid="_e4e80e42-0c06-453b-88b7-49cba0e4b476" id="sec.191-he">Grant of pipeline licence</heading><subclause affected.by.uncommenced="0" guid="_70c8d354-328b-4410-8668-3144ffcdce1d" id="sec.191-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a GHG coordination arrangement provides for a party to the arrangement to be granted a pipeline licence for a GHG stream pipeline.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_002c30b8-53c0-453e-b973-349ddabca289" id="sec.191-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister may if the party applies under the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.4" target.doc.id="act-2004-025" target.guid="_bce3f736-0a5e-4ba6-b741-c213b453c013" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">chapter 4</legref>, <legref check="valid" jurisd="QLD" refid="ch.4-pt.2" target.doc.id="act-2004-025" target.guid="_e81c6ae8-4e20-4f0d-bb34-255aa2c54d7c" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">part 2</legref>, grant the pipeline licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1cc32443-41d4-48cd-a0c8-03db05bd2f17" id="sec.191-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.412" target.doc.id="act-2004-025" target.guid="_4254ee96-45e5-4851-882e-f6dbec58a009" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">section 412</legref> applies as if the application were a pipeline licence application under that Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c9f108b7-c600-424a-9d7a-d3ae4fa3f5d6" id="sec.191-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, the provisions of the pipeline licence must be consistent with the arrangement.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_411cfd9f-f0e7-4f72-9976-507a674e5e62" id="sec.192" provision.type="other" spent.amends="0"><no>192</no><heading guid="_fbd543c8-18a1-405a-af7f-50a77baa66ac" id="sec.192-he">Amendment or cancellation by parties to arrangement</heading><subclause affected.by.uncommenced="0" guid="_690d226a-4abf-4521-833d-442b954bc320" id="sec.192-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A GHG coordination arrangement may be amended or cancelled by the parties to the arrangement only with the Minister’s approval.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d189640b-2ed1-4ef9-870d-01a541c292d8" id="sec.192-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A purported amendment or cancellation of a GHG coordination arrangement by the parties to it has no effect unless it complies with <intref check="valid" refid="sec.192-ssec.1" target.guid="_690d226a-4abf-4521-833d-442b954bc320">subsection (1)</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_95a0de67-cea9-4ae6-a19f-a3d15b5ab73f" id="sec.193" provision.type="other" spent.amends="0"><no>193</no><heading guid="_542eef85-eacf-44b9-8189-b0d8617d8a11" id="sec.193-he">Minister’s power to cancel arrangement</heading><subclause affected.by.uncommenced="0" guid="_20831cc2-72a2-4568-b326-6695d7dd13ce" id="sec.193-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may by complying with <intref check="valid" refid="sec.193-ssec.2" target.guid="_833aae5b-c73e-46dd-b9d1-45b731bc10b9">subsections (2)</intref> and <intref check="valid" refid="sec.193-ssec.3" target.guid="_22a19790-f60b-4305-aa2d-fce7d6db8de8">(3)</intref>, cancel a GHG coordination arrangement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_833aae5b-c73e-46dd-b9d1-45b731bc10b9" id="sec.193-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the Minister proposes to cancel the arrangement, the Minister must give each holder of a relevant lease a notice stating—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f30b7104-d773-4fbe-9922-17dea6a6462c" id="sec.193-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that the Minister proposes to cancel the arrangement; and</txt></block></li><li guid="_2cb4dbe7-5f2a-4f0f-9781-f66c207b5836" id="sec.193-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">reasons for the proposed cancellation; and</txt></block></li><li guid="_a6b16dc8-dc71-4957-b98e-f837f07d4643" id="sec.193-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that the holder may make submissions to the Minister about the proposed cancellation or the likely impact of the cancellation on the relevant leases.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_22a19790-f60b-4305-aa2d-fce7d6db8de8" id="sec.193-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Before cancelling the arrangement, the Minister must consider—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_45fd0de3-e002-438e-9850-ba5f2161a237" id="sec.193-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">any submissions made by a holder within the stated period; and</txt></block></li><li guid="_cc586aa6-378e-477c-a6d3-f35680895783" id="sec.193-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the likely impact of the cancellation on the relevant leases; and</txt></block></li><li guid="_9d5b978b-1437-4c0a-a1ec-9c664888ea16" id="sec.193-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the public interest.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_57482461-7828-4eae-9cfe-248ee39e6548" id="sec.193-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the Minister decides to cancel the arrangement, the Minister must give each of the holders an information notice about the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b54bf1b3-7793-4dc5-be55-5b9726002298" id="sec.193-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The cancellation takes effect on the end of the appeal period for the decision to cancel or if a later day of effect is stated in the information notice, on that day.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bc86f744-ddd2-450e-8fdc-ab3e17f7dd02" id="sec.193-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">When the decision takes effect, the arrangement and the Minister’s approval of it cease to have effect.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2e71e5e2-bd81-4a60-9d96-0bbfe663ab05" id="sec.194" provision.type="other" spent.amends="0"><no>194</no><heading guid="_a84f4efe-ea03-4f97-8377-ae1942553fc2" id="sec.194-he">Cancellation does not affect relevant leases</heading><block><txt break.before="1">The cancellation of a former GHG coordination arrangement does not affect any relevant lease.</txt></block></clause></part><part affected.by.uncommenced="0" guid="_9da70cbb-53b7-46ce-989e-04b5bd228a9b" id="ch.4-pt.3"><no>Part 3</no><heading guid="_99dc1ba1-3816-4133-8f50-7542dc267856" id="ch.4-pt.3-he">Obtaining GHG lease if overlapping authority</heading><division affected.by.uncommenced="0" guid="_68afa0bc-d970-4937-98ef-146d621f591e" id="ch.4-pt.3-div.1"><no>Division 1</no><heading guid="_fd983b17-8687-4cef-b734-14bc12e3d5bb" id="ch.4-pt.3-div.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_45bd3289-a39f-4471-b560-141fcea25750" id="sec.195" provision.type="other" spent.amends="0"><no>195</no><heading guid="_34c39017-6dde-479b-8645-33302310534d" id="sec.195-he">Application of <intref check="valid" refid="ch.4-pt.3" target.guid="_9da70cbb-53b7-46ce-989e-04b5bd228a9b">pt 3</intref></heading><block><txt break.before="1">This part applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e4e25d23-25c6-4c44-aed2-a35b446443cb" id="sec.195-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a person (the <defterm guid="_125f7a25-c5db-4a2c-ab59-20408b0f1570" id="sec.195-def.applicant" type="definition">applicant</defterm>) wishes to make a GHG lease application; and</txt></block></li><li guid="_e72b0955-744c-4a34-a26c-33616a44cee7" id="sec.195-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">there is an overlapping authority for the proposed GHG lease.</txt></block></li></list></block></clause></division><division affected.by.uncommenced="0" guid="_719be964-14b9-4fd9-9e04-1c925f3c4011" id="ch.4-pt.3-div.2"><no>Division 2</no><heading guid="_9a78e844-1c86-4719-b466-7716a3ac3595" id="ch.4-pt.3-div.2-he">Requirements for application</heading><clause affected.by.uncommenced="0" guid="_fb2ff223-5be4-453e-871d-662a7cb483b7" id="sec.196" provision.type="other" spent.amends="0"><no>196</no><heading guid="_fad3c4fc-44ab-4ad2-8a4a-edb72300e5d8" id="sec.196-he">Requirements for making application</heading><subclause affected.by.uncommenced="0" guid="_e7002d58-8b2c-46bf-80a8-a513aaed3a05" id="sec.196-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The GHG lease application must include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3ac3b1b9-1f84-441e-be20-03e04e2b50db" id="sec.196-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a statement that complies with <intref check="valid" refid="sec.197" target.guid="_78cded21-0f54-40df-a630-43413cd7fe73">section 197</intref> (a <defterm guid="_a01e53a2-902e-4247-890a-7c2627be3f78" id="sec.196-ssec.1-def.GHGstatement" type="definition">GHG statement</defterm>); and</txt></block></li><li guid="_64e19be9-bf7c-478c-9327-e2a915855569" id="sec.196-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">other information that addresses the matters mentioned in <intref check="valid" refid="sec.196-ssec.2" target.guid="_fa4dbe35-5b07-4c74-a198-14b779b6c965">subsection (2)</intref> (the <defterm guid="_6f0aaca0-84fe-463b-a796-45f62581a205" id="sec.196-ssec.1-def.GHGassessmentcriteria" type="definition">GHG assessment criteria</defterm>).</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_fa4dbe35-5b07-4c74-a198-14b779b6c965" id="sec.196-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The GHG assessment criteria are—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9ed1f896-1085-400c-96a9-0bc041efd281" id="sec.196-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">compliance with the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref> safety provisions; and</txt></block></li><li guid="_c182c8de-e63b-49fb-b1cc-d564ca4846af" id="sec.196-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the additional requirements under <intref check="valid" refid="ch.4-pt.7" target.guid="_b7ef90b3-cb43-41c0-869d-2295141d076c">part 7</intref> for proposed initial development plans; and</txt></block></li><li guid="_1288af13-1efd-4ad3-8578-b2509a5abe98" id="sec.196-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the potential for the parties to make a GHG coordination arrangement for the proposed GHG lease; and</txt></block></li><li guid="_abaff357-69a2-4396-a90a-f387001e8120" id="sec.196-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the economic and technical viability of the concurrent or coordinated carrying out of authorised activities for the proposed GHG lease and the overlapping authority; and</txt></block></li><li guid="_d53adcfa-aa40-47e5-9873-45b0318bd6cd" id="sec.196-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the public interest.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_78cded21-0f54-40df-a630-43413cd7fe73" id="sec.197" provision.type="other" spent.amends="0"><no>197</no><heading guid="_834cedce-bd88-46f3-bd5e-6c04247f0d58" id="sec.197-he">Content requirements for GHG statement</heading><block><txt break.before="1">The GHG statement must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_19b9f2a0-cf12-4414-a625-dd4688e5feb5" id="sec.197-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">assess—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d1ae01bc-f711-4474-a5ce-c8eae81a9161" id="sec.197-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the likely effect of proposed GHG storage activities under the proposed GHG lease on the future use of resources under the overlapping authority; and</txt></block></li><li guid="_ee975916-fe11-413b-a330-7d2ced4dd945" id="sec.197-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the technical and commercial feasibility of coordinating the proposed GHG storage activities and the future use of the resources; and</txt></block></li></list></block></li><li guid="_1a43cc16-eaca-4447-84cf-1903b710b672" id="sec.197-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">include proposals for the minimisation of potential adverse effects on possible future safe and efficient use of the resources under the overlapping authority.</txt></block></li></list></block></clause></division><division affected.by.uncommenced="0" guid="_f4b9352d-1848-4953-8057-519da76c8816" id="ch.4-pt.3-div.3"><no>Division 3</no><heading guid="_2c319744-722b-46a3-bf96-b2dae25de9bc" id="ch.4-pt.3-div.3-he">Consultation provisions</heading><clause affected.by.uncommenced="0" guid="_c1f8186d-ce91-43f7-9835-89267c53430c" id="sec.198" provision.type="other" spent.amends="0"><no>198</no><heading guid="_54bae879-4c77-44e5-b78e-a78949d99a04" id="sec.198-he">Applicant’s information obligation</heading><subclause affected.by.uncommenced="0" guid="_6ca360cd-2061-4e9a-bbf8-b321568ae243" id="sec.198-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The applicant must within 10 business days after making the GHG lease application give the overlapping authority holder a copy of the application other than any part of the application relating to the capability criteria.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3bb3c044-a979-45c1-b70d-86752eac0bd4" id="sec.198-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the Minister is reasonably satisfied the applicant has not complied with <intref check="valid" refid="sec.198-ssec.1" target.guid="_6ca360cd-2061-4e9a-bbf8-b321568ae243">subsection (1)</intref>, the Minister may refuse the application.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_bb5e8a41-b5f5-4393-b85c-56eccaa6f4b9" id="sec.199" provision.type="other" spent.amends="0"><no>199</no><heading guid="_38c55cf2-2ce6-419b-99f2-7a279e5d7e83" id="sec.199-he">Submissions by overlapping resource authority holder</heading><subclause affected.by.uncommenced="0" guid="_b83212e2-9928-415e-bb3d-e70ef0edacfa" id="sec.199-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The overlapping authority holder may make submissions to the Minister about the GHG lease application (<defterm guid="_3da1d90a-7416-488f-844a-0c8e264a6b67" id="sec.199-def.holdersubmissions" type="definition">holder submissions</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_924b031e-78b1-4ab1-bac1-497fc2021fbb" id="sec.199-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, holder submissions may be made only within 4 months after the holder is given a copy of the application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a4201865-ab59-4440-97c9-78fd4b45631f" id="sec.199-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Holder submissions may do all or any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d13177d1-2d9b-4393-a3c7-2adc923990fb" id="sec.199-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">state that the holder does not object to the granting of the proposed GHG lease;</txt></block></li><li guid="_75173843-dd07-41d0-a985-a58b56ce431c" id="sec.199-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the overlapping authority is an exploration authority (non-GHG) other than a geothermal exploration permit—state that the holder does not wish any priority for the resource for which the overlapping authority was granted (<defterm guid="_491d86f0-1627-4aeb-8c21-5765f5d20bbe" id="sec.199-ssec.3-def.overlappingauthoritypriority" type="definition">overlapping authority priority</defterm>);</txt></block></li><li guid="_82a9e770-05a1-4a87-9296-679f0660a87b" id="sec.199-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">include information about authorised activities carried out under the overlapping authority;</txt></block></li><li guid="_9ea7df1f-b6ba-4309-8a65-26856103e8b2" id="sec.199-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">include a proposal by the overlapping authority holder for the use of the resource;</txt></block></li><li guid="_0a7a13ee-b617-4160-8f6c-919dc32a0a66" id="sec.199-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">include information relevant to the GHG assessment criteria;</txt></block></li><li guid="_a45d533e-5907-4d37-842b-fe152950de72" id="sec.199-ssec.3-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">propose reasonable provisions for the safety management plan for the proposed GHG lease.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_92e10ee8-3299-4a6e-b2a3-8f36352d3ae2" id="sec.199-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The holder must give the applicant a copy of the holder submissions.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_0d0cbe63-cf16-4938-819b-2c0b8e11fe70" id="ch.4-pt.3-div.4"><no>Division 4</no><heading guid="_25e2722a-439e-4dcd-9ad5-f69f88bb7167" id="ch.4-pt.3-div.4-he">Resource management decision</heading><clause affected.by.uncommenced="0" guid="_522ba5ba-d987-4e7d-b30a-fe0aa67ef091" id="sec.200" provision.type="other" spent.amends="0"><no>200</no><heading guid="_bc8202c4-a9ef-4ab1-a86a-8b4edcfe310e" id="sec.200-he">Application of <intref check="valid" refid="ch.4-pt.3-div.4" target.guid="_0d0cbe63-cf16-4938-819b-2c0b8e11fe70">div 4</intref></heading><subclause affected.by.uncommenced="0" guid="_b93c45c8-f693-4cc6-a332-cfc31005f435" id="sec.200-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This division applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4ca00e49-5371-40cd-b797-963ab2cee2c0" id="sec.200-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the overlapping authority is an exploration authority (non-GHG); and</txt></block></li><li guid="_6220ad7d-7926-4657-a9df-292b2a0886d2" id="sec.200-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the overlapping authority holder has made holder submissions within 4 months after the holder was given a copy of the application; and</txt></block></li><li guid="_d68402e0-a3cb-4c69-95a1-ef5f7f35cb91" id="sec.200-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the submissions state that the holder wishes overlapping authority priority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_90b48f3b-c750-4afe-a8d3-d6acb89e43f4" id="sec.200-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, this division does not apply if, under another resource Act, overlapping authority priority has been given for any of the relevant land.</txt><note guid="_fc6829e8-20ae-4c0a-ab69-bf6e6f48ca1e" id="sec.200-ssec.2-note" type="example"><heading guid="_ee7aef39-7d90-412d-8adf-1df93f92d230" id="sec.200-ssec.2-note-he">Note—</heading><block><txt break.before="1">If this division does not apply, the GHG lease application proceeds immediately to decision under <intref check="valid" refid="ch.3" target.guid="_4c6bae05-4d64-4dbf-a4f3-a2736db63437">chapter 3</intref> as affected by <intref check="valid" refid="ch.4-pt.3-div.7" target.guid="_1a268f16-635b-4b14-878f-9f45aaa47a6d">division 7</intref>.</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_5001b0db-d88f-4070-9645-cc9ec4173b4d" id="sec.201" provision.type="other" spent.amends="0"><no>201</no><heading guid="_973c189a-6c03-4981-8534-54e01645ffcc" id="sec.201-he">Resource management decision</heading><block><txt break.before="1">The Minister must make a decision (the <defterm guid="_f476724e-ca9a-4f93-b1c9-c5d5daac0eec" id="def.resourcemanagementdecision" type="definition">resource management decision</defterm>) about whether—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5db784fe-2b1b-412a-87d2-1ffc6356365c" id="sec.201-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to grant the GHG lease application; or</txt></block></li><li guid="_04ff53fa-8f3c-4af1-bf0c-dede0a7c8c85" id="sec.201-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to give any overlapping authority priority for all or part of the relevant land; or</txt></block></li><li guid="_bed16835-69aa-481c-868b-329c0f9f4577" id="sec.201-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">not to grant the GHG lease application and not to give any overlapping authority priority for any of the relevant land.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_5945955a-8588-4cf2-b837-69354752c7c8" id="sec.202" provision.type="other" spent.amends="0"><no>202</no><heading guid="_89df1996-90f8-43f0-9480-f7b6fa5014dd" id="sec.202-he">Criteria for decision</heading><block><txt break.before="1">In making the resource management decision the Minister must have regard to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0f72cb29-9a01-4821-9017-077ffa0d3ecb" id="sec.202-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the GHG statement; and</txt></block></li><li guid="_3c0a3407-05d2-475f-8c77-d3daef254200" id="sec.202-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the GHG assessment criteria; and</txt></block></li><li guid="_552267ab-856a-4b23-b14f-c5699bec91f8" id="sec.202-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the holder submissions; and</txt></block></li><li guid="_3cd2cef4-efbc-42e5-bc70-82dfc37a6466" id="sec.202-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the public interest.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_d08c9517-e9c6-4b69-b055-c02c23335fd9" id="sec.203" provision.type="other" spent.amends="0"><no>203</no><heading guid="_83e85ea5-2178-41fb-bdaa-a8e7cf95d05a" id="sec.203-he">Restrictions on giving overlapping authority priority</heading><block><txt break.before="1">Overlapping authority priority may be given only if the Minister considers that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_79d97955-529f-4890-a77f-a6e47a62fb30" id="sec.203-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">either—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_64ef3264-1d2a-428f-94f6-977b7475641c" id="sec.203-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">it is unlikely that the applicant and the overlapping authority holder will enter into a GHG coordination arrangement; or</txt></block></li><li guid="_3e5a04c3-0859-4c87-bde7-12b454504785" id="sec.203-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a GHG coordination arrangement for the proposed GHG lease is not commercially or technically feasible; and</txt></block></li></list></block></li><li guid="_c65aede7-bca5-4807-b8ff-682b7ad413f0" id="sec.203-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the public interest would be best served by not granting a GHG lease to the applicant first.</txt></block></li></list></block></clause></division><division affected.by.uncommenced="0" guid="_c2be397d-fcd0-4f91-be7e-c8a7174ae13b" id="ch.4-pt.3-div.5"><no>Division 5</no><heading guid="_7be9587e-b506-4ca7-a3c4-430db8f8925c" id="ch.4-pt.3-div.5-he">Process if resource management decision is to give overlapping authority priority</heading><clause affected.by.uncommenced="0" guid="_0ce2bd21-a3e9-48ac-b896-45cd828bf7df" id="sec.204" provision.type="other" spent.amends="0"><no>204</no><heading guid="_d433a49e-867d-4b49-be2b-adb42e2dffe2" id="sec.204-he">Application of <intref check="valid" refid="ch.4-pt.3-div.5" target.guid="_c2be397d-fcd0-4f91-be7e-c8a7174ae13b">div 5</intref></heading><block><txt break.before="1">This division applies only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c79635be-4fc8-4638-a61f-d5696d39e82a" id="sec.204-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">under <intref check="valid" refid="ch.4-pt.3-div.4" target.guid="_0d0cbe63-cf16-4938-819b-2c0b8e11fe70">division 4</intref>, a resource management decision is required for the GHG lease application; and</txt></block></li><li guid="_28822bc5-3c25-4e98-9d8d-db92404f5270" id="sec.204-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that decision was to give overlapping authority priority for all or part of the relevant land.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_348769a4-9bff-4bbf-bd13-73e24e638b23" id="sec.205" provision.type="other" spent.amends="0"><no>205</no><heading guid="_f2569075-f2c2-4cf2-a42d-ed74bff4eb0d" id="sec.205-he">Notice to applicant and overlapping authority holder</heading><subclause affected.by.uncommenced="0" guid="_0a71d195-53e0-4bfc-8087-95c9c4f8b4bb" id="sec.205-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must give the applicant and the overlapping authority holder notice of the resource management decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_803fd4fc-f2ec-4792-8c58-56ae9b7d481d" id="sec.205-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must invite the overlapping authority holder to within 6 months after the giving of the notice (the <defterm guid="_a6fc9246-dc9e-4cd3-8198-4a8cf3517c27" id="sec.205-def.overlappingauthorityapplicationperiod" type="definition">overlapping authority application period</defterm>) apply for a lease under the <legref check="invalid" jurisd="QLD" type="act">Act</legref> under which the overlapping authority was granted (a <defterm guid="_6b97d0f9-8499-4bc0-89eb-131e88dd97ff" id="sec.205-def.relevantlease" type="definition">relevant lease</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2d8f32f9-87cc-41b5-b965-b623c19682cf" id="sec.205-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the priority is for all of the land—for all of the land; or</txt></block></li><li guid="_e8037c80-1f2e-43cf-a0af-9548d33a3054" id="sec.205-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the priority is for part of the land—for that part.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d1f66a83-e7fa-473c-92d4-079660b3a9c2" id="sec.206" provision.type="other" spent.amends="0"><no>206</no><heading guid="_a4bd15a9-d3a9-4f35-a0c1-a0fab21a0fb4" id="sec.206-he">Relevant lease application for all of the land</heading><subclause affected.by.uncommenced="0" guid="_2a6a0a20-3275-4869-be5d-e04e2e68588e" id="sec.206-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the priority is for all of the land and within the overlapping authority application period the overlapping authority holder applies for a relevant lease for all of the land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9122d316-a63a-4b2a-a460-7ef8027724e1" id="sec.206-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A further step can not be taken to decide the GHG lease application until after the relevant lease application has been decided.</txt><note guid="_25fe5783-b70e-41e8-913c-603d09bf1ed8" id="sec.206-ssec.2-note" type="example"><heading guid="_e5d18791-5a8e-490a-86e3-f49fc740359e" id="sec.206-ssec.2-note-he">Note—</heading><block><txt break.before="1">Acts under which the overlapping authority was granted provide for refusal of the relevant lease application if it is not pursued in a timely manner.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_7bc65bfe-b051-4a9f-9e11-16b66a266463" id="sec.206-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the decision on the relevant lease application is to grant a relevant lease for all of the land, the GHG lease application is taken to have lapsed.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c55988b4-b273-4115-b779-78d539e7a6f7" id="sec.207" provision.type="other" spent.amends="0"><no>207</no><heading guid="_422a1013-209e-44f0-9577-36473f54177d" id="sec.207-he">Relevant lease application for part of the land</heading><subclause affected.by.uncommenced="0" guid="_527eba06-3272-492a-a255-56b2f609bcbe" id="sec.207-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the overlapping authority holder applies for a relevant lease for part of the land within the overlapping authority application period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c8fe6ee4-3d46-4b4e-9767-5f7d1facecfb" id="sec.207-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The person who made the GHG lease application may amend it so that a GHG lease is only sought for all or part of the rest of the land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_12766133-2ba2-4534-975a-c92d52e36da1" id="sec.207-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Unless the amendment is made, a further step can not be taken to decide the GHG lease application until after the relevant lease application has been decided.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e83a6fa2-5409-4328-9659-e2d7abc095d2" id="sec.207-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0203520b-346e-4a05-8017-92531b633319" id="sec.207-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the amendment has not been made; and</txt></block></li><li guid="_1be8c736-da56-4e1d-b1b1-39f70af2035b" id="sec.207-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the decision on the relevant lease application is to grant a relevant lease for part of the land;</txt></block></li></list></block><block><txt break.before="1">the person who made the GHG lease application may amend it so that a GHG lease is only sought for all or part of the rest of the land.</txt><note guid="_de453f3b-9056-473d-85e2-52c4c9307552" id="sec.207-ssec.4-note" type="example"><heading guid="_b65767c6-394d-4f8c-8732-57a5b39ffa7a" id="sec.207-ssec.4-note-he">Note—</heading><block><txt break.before="1">If the GHG lease application is not amended, see <intref check="valid" refid="sec.211" target.guid="_000f523f-7bb5-4a30-8a2b-1a09a34d8958">section 211</intref> (Application may be refused if no reasonable prospects of GHG coordination arrangement).</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_bd7399d1-13b2-4a93-9b80-bd9a4f3b0ecd" id="sec.208" provision.type="other" spent.amends="0"><no>208</no><heading guid="_9e53245a-1482-4a14-95ac-8f75dbe318fe" id="sec.208-he">No relevant lease application</heading><block><txt break.before="1">If the overlapping authority holder does not apply for a relevant lease for any of the land within the overlapping authority application period, the GHG lease application may be decided.</txt></block></clause></division><division affected.by.uncommenced="0" guid="_5c3f5851-0200-4ca5-b5e6-fb6e7e5909f0" id="ch.4-pt.3-div.6"><no>Division 6</no><heading guid="_055f4313-e675-4a2a-8207-9dde568d222f" id="ch.4-pt.3-div.6-he">Resource management decision not to grant and not to give priority</heading><clause affected.by.uncommenced="0" guid="_068d89e0-1053-4793-9993-03dd48c411bc" id="sec.209" provision.type="other" spent.amends="0"><no>209</no><heading guid="_3c49abeb-db07-48aa-ae80-b63eb36f23f8" id="sec.209-he">Lapsing of application</heading><block><txt break.before="1">The GHG lease application is taken to have lapsed if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7e825b36-cbe2-49ec-9c91-6457a7ec4254" id="sec.209-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">under <intref check="valid" refid="ch.4-pt.3-div.4" target.guid="_0d0cbe63-cf16-4938-819b-2c0b8e11fe70">division 4</intref>, a resource management decision is required; and</txt></block></li><li guid="_2e0f19f3-7af5-43c7-91f0-f110e355a228" id="sec.209-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that decision was not to grant the GHG lease application and not to give any overlapping authority priority for any of the relevant land.</txt></block></li></list></block></clause></division><division affected.by.uncommenced="0" guid="_1a268f16-635b-4b14-878f-9f45aaa47a6d" id="ch.4-pt.3-div.7"><no>Division 7</no><heading guid="_4d19a6a4-5301-43e0-ab21-63d0dbf90671" id="ch.4-pt.3-div.7-he">Deciding application</heading><clause affected.by.uncommenced="0" guid="_57f4a21d-2cc1-4786-8c79-571166e13f64" id="sec.210" provision.type="other" spent.amends="0"><no>210</no><heading guid="_0784d705-41f9-4d44-80df-8aa66f744176" id="sec.210-he">Application of <intref check="valid" refid="ch.4-pt.3-div.7" target.guid="_1a268f16-635b-4b14-878f-9f45aaa47a6d">div 7</intref></heading><block><txt break.before="1">This division applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_89957608-888c-45dd-9fa4-037a5522dec9" id="sec.210-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the overlapping authority holder has not made holder submissions within 4 months after the holder was given a copy of the application (the <defterm guid="_e07ced15-e21c-4140-97c3-7c677ba8b88e" id="sec.210-def.submissionperiod" type="definition">submission period</defterm>) or at all; or</txt></block></li><li guid="_fb336e1c-5892-4489-a8e8-e36fbf309b59" id="sec.210-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the overlapping authority holder has made holder submissions within the submission period stating that the holder does not wish any overlapping authority priority; or</txt></block></li><li guid="_b9e18312-96d4-4d89-b8a9-e8b6670bdf25" id="sec.210-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">under <intref check="valid" refid="ch.4-pt.3-div.4" target.guid="_0d0cbe63-cf16-4938-819b-2c0b8e11fe70">division 4</intref>, a resource management decision is required and—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_35d47ced-024c-4822-916e-f8461e2a9266" id="sec.210-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the resource management decision was not to give overlapping authority priority for any of the relevant land; or</txt></block></li><li guid="_aa1f347d-3882-46a2-97d3-21b191c38e7b" id="sec.210-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the resource management decision was to give overlapping authority priority for all or part of the relevant land and after <intref check="valid" refid="ch.4-pt.3-div.5" target.guid="_c2be397d-fcd0-4f91-be7e-c8a7174ae13b">division 5</intref> has been complied with the Minister decides to grant a GHG lease for the land.</txt></block></li></list></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_000f523f-7bb5-4a30-8a2b-1a09a34d8958" id="sec.211" provision.type="other" spent.amends="0"><no>211</no><heading guid="_e5f03c55-3dd0-4c6c-b96c-0f6daf03afd1" id="sec.211-he">Application may be refused if no reasonable prospects of GHG coordination arrangement</heading><block><txt break.before="1">The Minister may decide to refuse the application if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_77f1ec64-aac5-40a8-ae73-f4dded54cced" id="sec.211-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the Minister is satisfied the applicant and the overlapping authority holder have made reasonable attempts to reach a proposed GHG coordination arrangement (a <defterm guid="_b311b0a9-e7f1-4f6f-a78a-48f9ea8a8b82" id="sec.211-def.relevantarrangement" type="definition">relevant arrangement</defterm>) for the proposed GHG lease; and</txt></block></li><li guid="_0b0ef8b7-f262-479d-a47e-4bdf047d4a07" id="sec.211-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">either—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_86701b35-f19e-43cb-85dd-1d6fbca2c7ba" id="sec.211-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the overlapping authority holder has given the Minister a notice stating there are no reasonable prospects of a relevant arrangement being made; or</txt></block></li><li guid="_e95a5bd2-7573-41d0-8f0b-5b71be69956e" id="sec.211-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the Minister has not been given a relevant arrangement for approval and the Minister considers the applicant and the overlapping authority holder have had a reasonable opportunity to make a relevant arrangement.</txt></block></li></list></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_5d569da9-24cb-4de2-9945-fcc2e51f69ad" id="sec.212" provision.type="other" spent.amends="0"><no>212</no><heading guid="_34bcfef2-934b-407d-a851-2c40661167a0" id="sec.212-he">Additional criteria for deciding provisions of GHG lease</heading><block><txt break.before="1">In deciding the provisions of the GHG lease the Minister must consider the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a32e44e8-7fce-4591-aa7e-a3d1ef945c4d" id="sec.212-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the GHG statement;</txt></block></li><li guid="_7bc4d4ca-db34-42d0-a43e-54d72a4c6214" id="sec.212-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the GHG assessment criteria;</txt></block></li><li guid="_ba87dc58-a84f-49f3-91d7-6db8a35130c0" id="sec.212-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">any holder submissions;</txt></block></li><li guid="_8d80b1fe-7398-4a0b-9cf6-38560ba9f135" id="sec.212-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the effect of the GHG lease on safe and efficient use of resources under any overlapping resource authority for the GHG lease if the overlapping resource authority is a lease;</txt></block></li><li guid="_ea8fc5e8-aa25-415c-a54a-1a39eac921c3" id="sec.212-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the effect on safe and efficient use of resources under any future lease for the GHG lease that may arise from the overlapping authority.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_8da53b10-67c5-4679-9047-a87a8aa58832" id="sec.213" provision.type="other" spent.amends="0"><no>213</no><heading guid="_5e689435-d607-4fa6-b74b-9f18a59de804" id="sec.213-he">Publication of outcome of application</heading><subclause affected.by.uncommenced="0" guid="_64a44c71-87e1-40b7-89bb-66ab6b35356a" id="sec.213-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">After the Minister decides whether or not to grant the GHG lease, the chief executive must publish a notice about the outcome of the GHG lease application in or on at least 1 of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4b02ed6a-7819-453a-b42e-0adc5278e49d" id="sec.213-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the gazette;</txt></block></li><li guid="_c79749ed-4c68-4ed2-84b4-1d622e28951f" id="sec.213-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the department’s website;</txt></block></li><li guid="_111802b9-c866-49c2-8c32-622eef0b61c6" id="sec.213-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">another publication the chief executive considers appropriate.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ccc02b97-f231-4bea-819f-a8ce9b399b13" id="sec.213-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e3125310-898a-49ad-80d4-035ce62cfa8e" id="sec.213-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the decision; and</txt></block></li><li guid="_cb103963-2582-483d-8fe2-2d6580117f74" id="sec.213-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the decision was to grant the GHG lease—all conditions of the GHG lease other than the mandatory conditions; and</txt></block></li><li guid="_ce3a3f34-5134-4efd-8abe-0c51bb3c898b" id="sec.213-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if under <intref check="valid" refid="ch.4-pt.3-div.4" target.guid="_0d0cbe63-cf16-4938-819b-2c0b8e11fe70">division 4</intref>, a resource management decision was required and that decision was to give overlapping authority priority for all or part of the land—the decision and the reasons for it.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_08b9db49-c13d-48fc-889d-0b721a4928d8" id="sec.213-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, if the chief executive considers that information in any condition is commercial-in-confidence, the chief executive may instead of publishing the condition publish a statement about the intent of the condition.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_b50d07c6-6209-46c4-80fa-a7db27994f96" id="ch.4-pt.4"><no>Part 4</no><heading guid="_a17ff6fd-e37d-4cef-bd7f-160b7eebe1f4" id="ch.4-pt.4-he">Priority to particular lease applications</heading><clause affected.by.uncommenced="0" guid="_ffd2540d-5dab-4c62-9424-eefdd13611be" id="sec.214" provision.type="other" spent.amends="0"><no>214</no><heading guid="_c9ecd183-0574-456d-9dbb-f81df2a81120" id="sec.214-he">Earlier geothermal, mining or petroleum lease application</heading><block><txt break.before="1">If—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_40fbf181-abcd-4040-a292-34732a82f352" id="sec.214-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a GHG lease application is made; and</txt></block></li><li guid="_8d8d2185-a670-4210-9ddd-7b318eefff5a" id="sec.214-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">before the making of that application, an application (the <defterm guid="_64ed704d-8259-49a6-9953-eb8dc831663e" id="sec.214-def.otherapplication" type="definition">other application</defterm>) was made for a geothermal lease, mining lease or petroleum lease (the <defterm guid="_f390118d-d708-4569-8d1d-25e6dafc942b" id="sec.214-def.otherproposedlease" type="definition">other proposed lease</defterm>); and</txt></block></li><li guid="_56e71efb-5875-4f6e-be48-5bf0cbb9755e" id="sec.214-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the other application had not been decided before the making of the GHG lease application; and</txt></block></li><li guid="_a5c28659-c327-4f54-ab3b-6f24a01c6a98" id="sec.214-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the other proposed lease is an overlapping resource authority for the proposed GHG lease;</txt></block></li></list></block><block><txt break.before="1">the GHG lease application must not be decided until the other lease application has been decided.</txt></block></clause><clause affected.by.uncommenced="0" guid="_e296b9b1-a4d4-462b-99f4-c0eab3b9878a" id="sec.215" provision.type="other" spent.amends="0"><no>215</no><heading guid="_993e1e34-e03c-4e9c-a650-2f19eeafa4af" id="sec.215-he">Proposed geothermal, mining or petroleum lease for which EIS approval given</heading><subclause affected.by.uncommenced="0" guid="_5b4c9726-2921-4c78-8a56-bdccabb9f6c0" id="sec.215-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies for a GHG lease application if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_02ba0cbd-c028-42f1-b777-a5fdd7391d23" id="sec.215-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before the making of the application, an approval under the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act"><name emphasis="no">Environmental Protection Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-1994-062" target.guid="_15fc0bc3-a060-4f70-84e5-3e5a03d6720f" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act">chapter 3</legref>, <legref check="valid" jurisd="QLD" refid="ch.3-pt.2" target.doc.id="act-1994-062" target.guid="_62f60fc4-9df9-4dd5-b38d-a9fb23557f01" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act">part 2</legref> was granted for the voluntary preparation of an EIS; and</txt></block></li><li guid="_88970d6f-c577-4688-8827-e3531b977633" id="sec.215-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the EIS is for a project that is or includes a proposed geothermal lease, mining lease or petroleum lease (the <defterm guid="_8907b387-c7ac-4bd1-b044-79dcae80c241" id="sec.215-ssec.1-def.otherproposedlease" type="definition">other proposed lease</defterm>) for land the subject of the application.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3be7e721-6e61-43af-87b7-bffb734865a9" id="sec.215-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application must not be decided until—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fabb2f34-39c5-47c4-9004-6b4a6f49468f" id="sec.215-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if no application is made for the other proposed lease within 2 years after the granting of the approval—the end of the 2 years; or</txt></block></li><li guid="_7fb64d6e-0ef1-46e9-b344-2b17a83ab63e" id="sec.215-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if an application is made for the other proposed lease within the 2 years—that application is decided.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_67a5362e-ee0c-4598-b57b-f5f058f9cdd7" id="sec.216" provision.type="other" spent.amends="0"><no>216</no><heading guid="_087ed2e3-5c2e-45d9-91da-bd54b8dfcec4" id="sec.216-he">Proposed geothermal, mining or petroleum lease declared a coordinated project</heading><subclause affected.by.uncommenced="0" guid="_df3ad854-ee21-46d6-aef4-dfb35fa5d5a1" id="sec.216-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies for a GHG lease application if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7ebfb91d-748a-42b1-8924-ff4c635c3d01" id="sec.216-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before the making of the application, a coordinated project was declared; and</txt></block></li><li guid="_f5633317-5727-4989-93c5-50beaac15a75" id="sec.216-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the project is or includes a proposed geothermal lease, mining lease or petroleum lease (the <defterm guid="_1c33c0ca-9509-4c97-a08f-c279a32a5ed0" id="sec.216-ssec.1-def.otherproposedlease" type="definition">other proposed lease</defterm>) for land the subject of the application.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b791464c-046e-41c3-950d-f01ac310a2ed" id="sec.216-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application must not be decided until—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a5635e0e-f589-49f1-a404-86ad96436f16" id="sec.216-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if no application is made for the other proposed lease within 1 year after the making of the declaration—the end of that year; or</txt></block></li><li guid="_c85f3ba6-b3a4-4029-9e1d-55abc5c03466" id="sec.216-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if an application is made for the other proposed lease within that year—that application is decided.</txt></block></li></list></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_fda69d3e-fedb-4796-b31d-3071df3ec5f1" id="ch.4-pt.5"><no>Part 5</no><heading guid="_4b4c0ca1-f880-41e6-8b5e-824274ec6fd0" id="ch.4-pt.5-he">GHG lease applications in response to invitation under resource Act</heading><clause affected.by.uncommenced="0" guid="_4d52f623-6e14-4605-96d8-1146cb969f6d" id="sec.217" provision.type="other" spent.amends="0"><no>217</no><heading guid="_4494c95f-0ee1-4995-bec5-4c5e3094033f" id="sec.217-he">Application of <intref check="valid" refid="ch.4-pt.5" target.guid="_fda69d3e-fedb-4796-b31d-3071df3ec5f1">pt 5</intref></heading><block><txt break.before="1">This part applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cfe2170d-1f96-471d-997b-9541b5e4ea53" id="sec.217-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a GHG lease application is made in response to an invitation given because of a resource management decision under a resource Act; and</txt></block></li><li guid="_ef9a5480-609a-447c-8425-9471132586c2" id="sec.217-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the application is made within 6 months after the giving of the invitation.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_299d90a1-f271-4d69-bf67-819484a23e31" id="sec.218" provision.type="other" spent.amends="0"><no>218</no><heading guid="_87e3810c-97f5-404b-b34e-ea2f274d0873" id="sec.218-he">Additional ground for refusing application</heading><subclause affected.by.uncommenced="0" guid="_7e7ed940-aeaa-43d8-913e-e9a844e9ab90" id="sec.218-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may decide to refuse the GHG lease application if satisfied the applicant has not in a timely manner—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d7c1f37a-77d3-467c-8ce6-98737fc4d176" id="sec.218-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">taken any step for the application required of the applicant under <intref check="valid" refid="ch.3" target.guid="_4c6bae05-4d64-4dbf-a4f3-a2736db63437">chapter 3</intref> or this chapter; or</txt></block></li><li guid="_7cfaf886-23df-4d02-8cf0-ed7ae5f29944" id="sec.218-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">satisfied the Minister about a matter that under <intref check="valid" refid="ch.3" target.guid="_4c6bae05-4d64-4dbf-a4f3-a2736db63437">chapter 3</intref> or this chapter, is required for the granting of the application.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6c028b27-c857-4a64-94b3-3ec7d4def837" id="sec.218-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.218-ssec.1" target.guid="_7e7ed940-aeaa-43d8-913e-e9a844e9ab90">Subsection (1)</intref> does not limit <intref check="valid" refid="sec.413" target.guid="_abfc625f-6455-41a7-be31-d4abf55df2a4">section 413</intref> or <intref check="valid" refid="sec.413A" target.guid="_c37e27ab-8e7a-4296-b2d3-b7e8a1239c71">413A</intref>.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_027c34e7-56d4-4351-995a-91550364e7d1" id="ch.4-pt.6"><no>Part 6</no><heading guid="_1b4b65dc-7506-46c1-8a8b-451fe1d16aa0" id="ch.4-pt.6-he">Additional provisions for GHG authorities</heading><division affected.by.uncommenced="0" guid="_114fc001-1d60-400e-86ca-d0b3cfbd661e" id="ch.4-pt.6-div.1"><no>Division 1</no><heading guid="_cb233a44-0753-47cc-9646-9e776a1bd8da" id="ch.4-pt.6-div.1-he">Restrictions on authorised activities other than for GHG leases</heading><clause affected.by.uncommenced="0" guid="_55ffa960-34cc-4425-9fc1-fcba8f631be3" id="sec.219" provision.type="other" spent.amends="0"><no>219</no><heading guid="_a12b3133-cc6e-4447-a009-9d4398c52a50" id="sec.219-he">Overlapping geothermal, mining or petroleum lease</heading><subclause affected.by.uncommenced="0" guid="_44504821-4adc-4d36-a069-7b9778da334a" id="sec.219-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if land is in the area of both of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d270560c-407c-44dc-8583-416574b3e866" id="sec.219-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a GHG permit or GHG data acquisition authority (the <defterm guid="_6022140b-7a49-4e60-a293-7241d19aec65" id="sec.219-ssec.1-def.GHGauthority" type="definition">GHG authority</defterm>);</txt></block></li><li guid="_21e17625-acab-419d-aa5c-15f45485147e" id="sec.219-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a geothermal lease, mining lease or petroleum lease (a <defterm guid="_291b688b-0baa-4e6e-9035-060d2f56f12d" id="sec.219-ssec.1-def.relevantlease" type="definition">relevant lease</defterm>).</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_598d0219-dc9e-44a5-a679-94a10dd71366" id="sec.219-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, this section does not apply if the same person holds the GHG authority and the relevant lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f2a3a818-e7a2-4a20-89e7-1d988846efb1" id="sec.219-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">An authorised activity for the GHG authority may be carried out on the land only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_90319c79-c95c-454a-9d83-677b37ecd457" id="sec.219-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the relevant lease holder has not, in the way required under <intref check="valid" refid="sec.219-ssec.4" target.guid="_88dc2951-025f-4b28-ad8d-ae8ce7ddc9d0">subsection (4)</intref>, objected to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9bea2119-cf10-48b2-97d0-806f5b2449ad" id="sec.219-ssec.3-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the carrying out of the activity; or</txt></block></li><li guid="_3f10f551-02f9-4b71-ada9-6f7ef953068e" id="sec.219-ssec.3-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref> safety provisions require a safety management plan for the GHG authority holder—the safety management plan; or</txt></block></li></list></block></li><li guid="_3113e191-1248-4a10-8b65-027110fb6765" id="sec.219-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if an objection under <intref check="valid" refid="sec.219-ssec.3-para1.a" target.guid="_90319c79-c95c-454a-9d83-677b37ecd457">paragraph (a)</intref> has been made—the Minister has, under <intref check="valid" refid="sec.221" target.guid="_900e5eab-e666-4cd6-aaeb-0b9aad2e569b">section 221</intref>, decided the authorised activity may be carried out.</txt></block></li></list><note guid="_9bae711e-ce19-4b91-a0ae-6b9694a4ebf0" id="sec.219-ssec.3-note" type="example"><heading guid="_f329f403-86ae-49e6-904d-53e1bc12c796" id="sec.219-ssec.3-note-he">Note—</heading><block><txt break.before="1">For notice of authorised activities, see <intref check="valid" refid="sec.223" target.guid="_204ce51f-7680-4c8a-a0cf-181994dc75bb">section 223</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_88dc2951-025f-4b28-ad8d-ae8ce7ddc9d0" id="sec.219-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The objection must be in the approved form and given to the Minister and the GHG authority holder.</txt><note guid="_50ff19ad-43dc-4ade-94f0-ca6656d81349" id="sec.219-ssec.4-note" type="example"><heading guid="_d2f72934-0bc6-412b-ae3a-32d91ca0d394" id="sec.219-ssec.4-note-he">Note—</heading><block><txt break.before="1">See also the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.403" target.doc.id="act-1989-110" target.guid="_acc1b576-5463-4539-9121-24fca0813d33" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 403</legref> (Offences regarding land subject to mining claim or mining lease).</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_9148f375-ba1f-4ccf-b008-f9e934459f58" id="sec.220" provision.type="other" spent.amends="0"><no>220</no><heading guid="_83c4b084-58f6-4731-ac7c-b0064b32042c" id="sec.220-he">Overlapping exploration authority (non-GHG)</heading><subclause affected.by.uncommenced="0" guid="_9b4df212-ccad-4a02-b7b8-bd780d0f4b0b" id="sec.220-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if land is in the area of both of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b76e4b8b-d394-42d9-b7db-8a6f517c669f" id="sec.220-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a GHG authority other than a GHG lease;</txt></block></li><li guid="_47cdf32a-e849-449b-a205-02fff4d20bc8" id="sec.220-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an exploration authority (non-GHG).</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b8e2f159-5799-41cb-9c8d-2448904dfdce" id="sec.220-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An authorised activity for the GHG authority can not be carried out on the land if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5b66345f-0c08-4e7d-bcf3-53428527097f" id="sec.220-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">carrying it out adversely affects the carrying out of an authorised activity for the exploration authority (non-GHG); and</txt></block></li><li guid="_702c9416-a5ab-4ad8-b74d-5d70bdc20bcb" id="sec.220-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the authorised activity for the exploration authority (non-GHG) has already started.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_900e5eab-e666-4cd6-aaeb-0b9aad2e569b" id="sec.221" provision.type="other" spent.amends="0"><no>221</no><heading guid="_98b3f0a0-b3e4-426b-8b72-87983ec4cabd" id="sec.221-he">Resolving disputes</heading><subclause affected.by.uncommenced="0" guid="_a02789dd-15a0-4d05-b33e-2f15231dc4d5" id="sec.221-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if under <intref check="valid" refid="sec.219" target.guid="_55ffa960-34cc-4425-9fc1-fcba8f631be3">section 219</intref> a relevant lease holder has objected to the carrying out of a GHG storage activity by a GHG authority holder.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c9e91d1d-49de-4b0f-a7eb-52d45de99c54" id="sec.221-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">This section also applies if there is a dispute between a GHG authority holder and an exploration authority (non-GHG) holder about whether an authorised activity for the GHG authority can be carried out under <intref check="valid" refid="sec.220" target.guid="_9148f375-ba1f-4ccf-b008-f9e934459f58">section 220</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_88642bc1-41b9-4c47-84e4-ee00fd896786" id="sec.221-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Either of the parties may by a notice in the approved form ask the Minister to decide—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fce553bd-3cd2-4a4c-9fb3-615b59eb3d32" id="sec.221-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for <intref check="valid" refid="sec.219" target.guid="_55ffa960-34cc-4425-9fc1-fcba8f631be3">section 219</intref>—whether the authorised activity may be carried out under that section; or</txt></block></li><li guid="_a3b9bc6e-8569-44dc-a976-b225fa5ed575" id="sec.221-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for <intref check="valid" refid="sec.220" target.guid="_9148f375-ba1f-4ccf-b008-f9e934459f58">section 220</intref>—whether the authorised activity may be carried out under that section.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a8fde1da-5c82-4620-804b-bad168f886cc" id="sec.221-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Before making the decision the Minister must give the parties a reasonable opportunity to make submissions about the request within a reasonable period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_598b95c6-fcca-4164-b623-817e71f18f6d" id="sec.221-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The Minister must, after complying with <intref check="valid" refid="sec.221-ssec.4" target.guid="_a8fde1da-5c82-4620-804b-bad168f886cc">subsection (4)</intref> and considering any submission made under that subsection, decide the matter and give the parties notice of the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2a8bd16c-518e-422d-b835-40ee533be42f" id="sec.221-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The Minister’s decision binds the parties.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_912c22aa-f9ea-4890-ac58-40efe0a7786f" id="sec.221-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">If the request is about a matter mentioned in <intref check="valid" refid="sec.221-ssec.1" target.guid="_a02789dd-15a0-4d05-b33e-2f15231dc4d5">subsection (1)</intref>, the Minister may impose conditions on any decision that the authorised activity may be carried out.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_10b9641d-b446-4502-81af-31a2705b324b" id="sec.221-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_b1555e72-7dbf-44b1-b3df-478eb7396a50" id="sec.221-ssec.8-def.parties_"><txt break.before="1"><defterm guid="_2bb0a540-58f9-408e-bf54-9ce751eba7a6" id="sec.221-ssec.8-def.parties" type="definition">parties</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4cf1eb29-9ccf-4e27-a2db-166a2f77b392" id="sec.221-ssec.8-def.parties-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for a request about a matter mentioned in <intref check="valid" refid="sec.221-ssec.1" target.guid="_a02789dd-15a0-4d05-b33e-2f15231dc4d5">subsection (1)</intref>—the GHG authority holder and the relevant lease holder; or</txt></block></li><li guid="_4d9e6724-cc26-4b73-8c8c-b654218c8885" id="sec.221-ssec.8-def.parties-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for a request about a matter mentioned in <intref check="valid" refid="sec.221-ssec.2" target.guid="_c9e91d1d-49de-4b0f-a7eb-52d45de99c54">subsection (2)</intref>—the GHG authority holder and the exploration authority (non-GHG) holder.</txt></block></li></list></definition></deflist></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_1b700338-08d1-4673-9dc3-97eab1a152bd" id="ch.4-pt.6-div.2"><no>Division 2</no><heading guid="_30b36066-85f3-46dd-9457-7b84e2054c65" id="ch.4-pt.6-div.2-he">Additional conditions</heading><clause affected.by.uncommenced="0" guid="_14cb9a61-0a88-449e-a9c5-e9346b48f03d" id="sec.222" provision.type="other" spent.amends="0"><no>222</no><heading guid="_5db7b8a5-fb2c-4139-a697-83621a06d7c5" id="sec.222-he">Notice of grant by particular GHG authority holders</heading><subclause affected.by.uncommenced="0" guid="_9d3801f6-8943-4dec-ae28-3439adeb7ff2" id="sec.222-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d92d3467-33dc-4465-95a3-5a8f09e7e6f0" id="sec.222-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a GHG authority other than a GHG lease is granted; and</txt></block></li><li guid="_64337f5c-afcc-47d0-8338-2ab0e85f82d7" id="sec.222-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">land in the GHG authority’s area is in the area of or in a proposed area under an application for any of the following other authorities—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f378b5a1-1cb6-4451-b0c7-d3f3c1515cda" id="sec.222-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">an exploration authority (non-GHG);</txt></block></li><li guid="_08c2ce76-9e1c-4f7e-b44c-2321fbc76b7b" id="sec.222-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a GHG data acquisition authority;</txt></block></li><li guid="_0e066349-bf0b-42d2-8d18-6b7552c5a22e" id="sec.222-ssec.1-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">a data acquisition authority under the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref>;</txt></block></li><li guid="_344a12b8-02eb-4b03-ae81-4984c6f095c6" id="sec.222-ssec.1-para1.b-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">a water monitoring authority under the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref>.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2a71d3aa-1d81-49a6-981e-1e0d767d4ec5" id="sec.222-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">It is a condition of the GHG authority that its holder must within 20 business days after the holder receives notice of the grant, give the holder of or applicant for the other authority a notice stating—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e056f5ca-5217-4e3e-919f-5459c2921574" id="sec.222-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that the GHG authority has been granted; and</txt></block></li><li guid="_20f705dc-7a2b-443c-a9d0-eb5e04a4b955" id="sec.222-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the GHG authority holder’s name; and</txt></block></li><li guid="_61e8fdcf-95f6-436a-ba67-1d2b8fef2ce4" id="sec.222-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the term of the GHG authority.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_204ce51f-7680-4c8a-a0cf-181994dc75bb" id="sec.223" provision.type="other" spent.amends="0"><no>223</no><heading guid="_7ca89dfe-9f3c-4ba5-ba48-988d42dac6e7" id="sec.223-he">Condition to notify particular other authority holders of proposed start of particular authorised activities</heading><subclause affected.by.uncommenced="0" guid="_b2044c57-85d9-47fd-964a-6377efb2faf5" id="sec.223-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to a GHG authority holder if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e45160f9-ebf7-4943-82a9-14f00dd5a13f" id="sec.223-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">there is any of the following (the <defterm guid="_efb3641c-c1dc-4ae7-9a17-187946f260a3" id="sec.223-ssec.1-def.otherauthority" type="definition">other authority</defterm>) for the GHG authority—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_48e5f930-7e8f-45f9-bde3-54279563fae4" id="sec.223-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">an overlapping authority;</txt></block></li><li guid="_64fa53f2-60bb-486d-abd5-1fc1112ebbee" id="sec.223-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a geothermal permit, mining lease or petroleum tenure that shares a common boundary with the GHG authority; or</txt></block></li></list></block></li><li guid="_2ee43cbe-00c3-440b-a17b-638e570b2abe" id="sec.223-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">land in the GHG authority’s area is in the area of a data acquisition authority under the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref> (also the <defterm guid="_858f08b3-661c-475f-bf3f-7acc3ba6cbbd" id="sec.223-ssec.1-def.otherauthority-oc.2" type="definition">other authority</defterm>).</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_52922d6b-1099-4d1d-b2fc-10e05637f186" id="sec.223-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Before the GHG authority holder first starts a designated activity in the other authority’s area, the GHG authority holder must give the other authority holder at least 30 business days notice of the activity.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c14f3a2b-80bb-4767-8839-9cdfa0eea67a" id="sec.223-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A notice under <intref check="valid" refid="sec.223-ssec.2" target.guid="_52922d6b-1099-4d1d-b2fc-10e05637f186">subsection (2)</intref> must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3fe71502-ede0-43e7-96dc-b83709f0d5cb" id="sec.223-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">when the designated activity is to start; and</txt></block></li><li guid="_bf2c6741-5103-423b-a0a1-fe27dba93a5e" id="sec.223-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">where the designated activity is to be carried out; and</txt></block></li><li guid="_4c0ad0db-1148-4d6a-b0f6-ce03a954e094" id="sec.223-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the nature of the activity.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f9bd6046-789d-499d-922c-69178b81cf86" id="sec.223-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Before changing the land on which the designated activity is being carried out, the GHG authority holder must give the other authority holder at least 30 business days notice stating where the activity is to be carried out.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_444c119f-57c8-4596-a60a-8d1775b760b2" id="sec.223-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Compliance with this section is a condition of the GHG authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5352ad78-6f3a-48ca-8e18-b1dcf0046890" id="sec.223-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_601f6efa-4cf7-4ccb-b54c-c57234dca05d" id="sec.223-ssec.6-def.designatedactivity_"><txt break.before="1"><defterm guid="_111c8d99-f723-4f42-aac7-1daddf633c52" id="sec.223-ssec.6-def.designatedactivity" type="definition">designated activity</defterm> means any authorised activity for the GHG authority other than—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_74b37709-65d5-4aab-a886-41bb59b65f51" id="sec.223-ssec.6-def.designatedactivity-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an incidental activity under <intref check="valid" refid="sec.31" target.guid="_89f6a548-55bd-4305-9c49-bc4abc700a6b">section 31</intref> or <intref check="valid" refid="sec.112" target.guid="_01d123f6-b9db-4544-8528-062bfc605df5">112</intref>; or</txt></block></li><li guid="_6e74e50a-97dd-4139-b9f2-8a223d2be84c" id="sec.223-ssec.6-def.designatedactivity-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an activity that only involves selecting places where other authorised activities for the GHG authority may be carried out.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0ffa5a49-2a35-4b69-bd56-d009b00b2507" id="sec.224" provision.type="other" spent.amends="0"><no>224</no><heading guid="_5d6caefc-cb75-4cc3-acac-6a7ac8fe0f58" id="sec.224-he">Continuance of GHG coordination arrangement after transfer</heading><subclause affected.by.uncommenced="0" guid="_39f26c37-51f3-4aab-9ffb-4bee3f0a9c57" id="sec.224-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0dce8892-ec60-4f51-9ba9-162a2e9385b3" id="sec.224-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">there is an overlapping authority for a GHG lease; and</txt></block></li><li guid="_3b062950-4250-47e4-8434-c2a15d4bc42d" id="sec.224-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a GHG coordination arrangement applies to the GHG lease; and</txt></block></li><li guid="_a89a5c04-48a7-4119-8e4d-dcf675a59413" id="sec.224-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the GHG lease is transferred.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a8916a2e-62d2-4608-8719-eb038f2834f1" id="sec.224-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">It is a condition of the GHG lease that its holder must continue to be a party to a GHG coordination arrangement for the lease while the overlapping authority continues in force.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_b7f1354f-262f-42e3-acb1-76386063260c" id="ch.4-pt.6-div.3"><no>Division 3</no><heading guid="_5a2cd90f-e0a6-4482-bb7f-eb6f15e465ad" id="ch.4-pt.6-div.3-he">Restriction on Minister’s power to amend GHG lease if overlapping authority</heading><clause affected.by.uncommenced="0" guid="_0cf7d93c-53a9-48a7-b0db-78b343838a5a" id="sec.225" provision.type="other" spent.amends="0"><no>225</no><heading guid="_55b3ecb0-ad04-4d59-9e3b-48465e4e2bab" id="sec.225-he">Interests of overlapping authority holder to be considered</heading><block><txt break.before="1">If there is an overlapping authority for a GHG lease, it may be amended under <intref check="valid" refid="sec.374" target.guid="_051788fc-cc5f-4206-b144-a3bec26444e4">section 374</intref> only if the interests of the overlapping authority holder have been considered.</txt></block></clause></division></part><part affected.by.uncommenced="0" guid="_b7ef90b3-cb43-41c0-869d-2295141d076c" id="ch.4-pt.7"><no>Part 7</no><heading guid="_c9150f85-8eb1-4591-923d-621b8396342d" id="ch.4-pt.7-he">Additional provisions for development plans if overlapping authority</heading><clause affected.by.uncommenced="0" guid="_8ce682f1-40b8-4de8-9d37-d850e8491e53" id="sec.226" provision.type="other" spent.amends="0"><no>226</no><heading guid="_e6b6810a-8290-46af-910c-f53f4934d9d6" id="sec.226-he">Operation of <intref check="valid" refid="ch.4-pt.7" target.guid="_b7ef90b3-cb43-41c0-869d-2295141d076c">pt 7</intref></heading><block><txt break.before="1">This part imposes additional requirements for the following for a GHG lease or proposed GHG lease for which there is an overlapping authority—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_01bc1f89-c58a-49aa-9e0f-af46d5cbf48c" id="sec.226-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a proposed initial development plan;</txt></block></li><li guid="_11df106a-52cf-495b-8ca3-f84e28117cb1" id="sec.226-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a proposed later development plan;</txt></block></li><li guid="_d4f97a2a-d489-47a9-8936-17609df09eaa" id="sec.226-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a proposed amendment under an application to amend a development plan.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_98ad6710-9798-4b7c-9a07-4872f7e07792" id="sec.227" provision.type="other" spent.amends="0"><no>227</no><heading guid="_eb38fd25-4b0c-4997-b5d6-a4ff6134dce6" id="sec.227-he">Statement about interests of overlapping authority holder</heading><block><txt break.before="1">The proposed plan or amendment must include a statement of how the effects on and the interests of any overlapping authority holder have or have not been considered, having regard to the GHG assessment criteria.</txt></block></clause><clause affected.by.uncommenced="0" guid="_dcaa84b2-a43a-443c-b7ae-8868fe5a8153" id="sec.228" provision.type="other" spent.amends="0"><no>228</no><heading guid="_43b67ea8-8d34-4802-b33d-5610eb795d4a" id="sec.228-he">Consistency with overlapping resource authority’s development plan and with any relevant coordination arrangement</heading><subclause affected.by.uncommenced="0" guid="_91ca62ee-6f0a-4a7e-a72f-da31d3ddf899" id="sec.228-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">To the extent the area of the GHG lease and the overlapping authority coincide or will coincide, the proposed plan or amendment must be consistent with any geothermal coordination arrangement or GHG coordination arrangement for that area.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9c88f53e-43fc-45d2-ada1-152af5f9f756" id="sec.228-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.228-ssec.3" target.guid="_efb1ae63-bd97-4c22-bb78-fbbddbee5514">Subsection (3)</intref> applies if the overlapping authority is a mining lease or petroleum lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_efb1ae63-bd97-4c22-bb78-fbbddbee5514" id="sec.228-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The proposed plan or amendment must to the extent the area of the GHG lease and the mining lease or petroleum lease coincide or will coincide be consistent with the development plan for the overlapping authority.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_4f7925d4-fe35-4e00-b9f2-b4451b808f4f" id="sec.229" provision.type="other" spent.amends="0"><no>229</no><heading guid="_379404dc-cc44-4982-90f3-36c02ba2cfa8" id="sec.229-he">Additional criteria for approval</heading><block><txt break.before="1">In deciding whether to approve the proposed plan or amendment the Minister must consider the GHG assessment criteria.</txt></block></clause></part><part affected.by.uncommenced="0" guid="_79a3d64a-5be9-4717-a261-e8880b077421" id="ch.4-pt.8"><no>Part 8</no><heading guid="_21e3bd01-8ded-42b8-a959-de9100192302" id="ch.4-pt.8-he">Additional provisions for safety management plans</heading><clause affected.by.uncommenced="0" guid="_8824aab1-188f-40b6-a8d0-1838e1e59da5" id="sec.230" provision.type="other" spent.amends="0"><no>230</no><heading guid="_f2361f1b-a799-42b1-b3d0-847caadbce2d" id="sec.230-he">Grant of GHG lease does not affect obligation to make plan</heading><subclause affected.by.uncommenced="0" guid="_bcd12758-20b4-417d-99ad-e8728843ac7c" id="sec.230-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a GHG statement accompanies a GHG lease application as required under this chapter.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_70f5cf72-3549-46d1-a307-a8dcb7731346" id="sec.230-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The deciding of the application or the grant of the GHG lease—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d6b53479-1e3c-4461-8f01-bb075cfd551e" id="sec.230-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">does not affect the obligation under the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref> safety provisions to make a safety management plan for any operating plant in the GHG lease’s area; and</txt></block></li><li guid="_fd197a94-f4ab-499f-a157-a8613190c461" id="sec.230-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is not of itself evidence that a safety management plan, or purported safety management plan, for an operating plant in the GHG lease’s area complies with those provisions.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d29fa1c2-08e5-429e-9940-6ab6b9e197e0" id="sec.231" provision.type="other" spent.amends="0"><no>231</no><heading guid="_08bba78c-e92b-4b5c-87e5-b3ca0f7034a7" id="sec.231-he">Requirements for consultation with particular overlapping resource authority holders</heading><subclause affected.by.uncommenced="0" guid="_d7a2f097-dfe4-4a69-88f2-8426c5b89a11" id="sec.231-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b0fb3fff-3c2b-420d-855f-21f822e516cc" id="sec.231-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a person (an <defterm guid="_20db0374-d286-4ca0-950e-9c7ebf898745" id="sec.231-ssec.1-def.operator" type="definition">operator</defterm>) proposes to be an operator of operating plant under the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref> in the area of a GHG tenure; and</txt></block></li><li guid="_28fb45b3-7346-40ae-83f2-0b99609e53a6" id="sec.231-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the operating plant is used or is proposed to be used for GHG storage activities (<defterm guid="_06a1fcdd-4730-47b9-a2a8-6cfb9f483929" id="sec.231-ssec.1-def.relevantoperatingplant" type="definition">relevant operating plant</defterm>); and</txt></block></li><li guid="_701d3eb3-942d-4d1c-9d2f-bfeeb30896a2" id="sec.231-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">activities (<defterm guid="_777c0ec3-ba3f-4566-8d9b-e048fc8b9944" id="sec.231-ssec.1-def.relevantactivities" type="definition">relevant activities</defterm>) carried out, or proposed to be carried out, at the plant may adversely affect the safe and efficient use of resources under an overlapping authority for the GHG tenure.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_43b619ef-95ea-4109-8b4b-907e216acad7" id="sec.231-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Before any operator may operate relevant operating plant, each operator must have made reasonable attempts to consult with the overlapping authority holder about relevant activities for the plant.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_58be20cf-210d-4d9c-b2cf-37817ee06309" id="sec.231-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If there is more than 1 operator, the GHG tenure holder may coordinate the consultation between the operators and the overlapping authority holder.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d360732b-a86a-4fce-8257-1c084f88f2d8" id="sec.231-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">For <intref check="valid" refid="sec.231-ssec.2" target.guid="_43b619ef-95ea-4109-8b4b-907e216acad7">subsection (2)</intref>, an operator is taken to have made reasonable attempts to consult if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_60642f0c-d607-48bd-b156-ebd015279bee" id="sec.231-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the operator gives the overlapping authority holder a copy of the parts of the operator’s proposed safety management plan concerning any relevant operating plant the operator proposes to operate for the relevant activities; and</txt></block></li><li guid="_ff5f1d7b-4a93-4b66-8bd1-16893ee62dab" id="sec.231-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the overlapping authority holder has not within 30 days after the giving of the copy made any proposal to the operator about provisions for the plan.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f166902e-8f0a-4c3d-a667-b9ad5e893c0c" id="sec.231-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">An operator must before making or remaking a safety management plan for any relevant operating plant the operator operates or proposes to operate, have regard to any reasonable provisions for the plan proposed by the overlapping authority holder concerning relevant activities for the plant.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8139f54e-ba4a-4999-b758-1178219348f5" id="sec.231-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">However, the obligation under <intref check="valid" refid="sec.231-ssec.5" target.guid="_f166902e-8f0a-4c3d-a667-b9ad5e893c0c">subsection (5)</intref> applies only to the extent the provisions are commercially and technically feasible for the operator or any relevant GHG tenure holder.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_725f8898-bda0-4d7c-a237-f8b658ac7901" id="sec.231-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">If an operator makes a safety management plan for relevant operating plant that includes provisions proposed by the overlapping authority holder, the operator must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1f71dba2-a0bb-4563-844f-079bdc62370b" id="sec.231-ssec.7-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">give the overlapping authority holder a copy; and</txt></block></li><li guid="_c8db3c75-7ff5-4eb9-80a2-62b028b3c7c0" id="sec.231-ssec.7-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give the chief inspector under the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref> a notice stating any provisions proposed under <intref check="valid" refid="sec.231-ssec.5" target.guid="_f166902e-8f0a-4c3d-a667-b9ad5e893c0c">subsection (5)</intref> and whether they were included in the plan.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1fe09acb-ecda-4989-833c-a45f829d7347" id="sec.231-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_a425d13c-de8e-4dbf-b931-31a20545ede5" id="sec.231-ssec.8-def.remaking_"><txt break.before="1"><defterm guid="_440659b6-981a-41dc-b4e7-817231bd3068" id="sec.231-ssec.8-def.remaking" type="definition">remaking</defterm>, a safety management plan, includes an amendment or remaking of the plan of a type required under the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.678" target.doc.id="act-2004-025" target.guid="_5866f51f-4c62-40b8-8825-15676b967ab1" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">section 678</legref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b2709a76-f76e-46c2-8106-691f562a74f4" id="sec.232" provision.type="other" spent.amends="0"><no>232</no><heading guid="_98df5ec4-0f92-4522-b529-5a07f7b4a764" id="sec.232-he">Application of <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref> provisions for resolving disputes about reasonableness of proposed provision</heading><subclause affected.by.uncommenced="0" guid="_b1b34359-713c-4f6d-946d-056bc6b9b833" id="sec.232-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a dispute exists between an operator under <intref check="valid" refid="sec.231" target.guid="_d29fa1c2-08e5-429e-9940-6ab6b9e197e0">section 231</intref> and an overlapping authority holder about the reasonableness of a provision proposed by the overlapping authority holder for the operator’s proposed safety management plan.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_143ceb20-f689-4f70-8b70-2cd9bb143a77" id="sec.232-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.387" target.doc.id="act-2004-025" target.guid="_3c5dde7a-6435-48ef-9c80-4f35b0f30630" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">section 387</legref>, <legref check="valid" jurisd="QLD" refid="ch.12" target.doc.id="act-2004-025" target.guid="_27e89a9e-1acd-4e56-96fc-dd3712c2ec2a" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">chapter 12</legref> and <legref check="valid" jurisd="QLD" refid="sch.1" target.doc.id="act-2004-025" target.guid="_7e30dc7a-6468-45ca-86c4-41e9b141965e" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">schedule 1</legref> apply to the dispute as if it were a dispute to which <legref check="valid" jurisd="QLD" refid="sec.387" target.doc.id="act-2004-025" target.guid="_3c5dde7a-6435-48ef-9c80-4f35b0f30630" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">section 387</legref> of that Act applies.</txt><note guid="_09cc40f9-03ad-44a4-986a-ec152ddbc97b" id="sec.232-ssec.2-note" type="editorial"><heading guid="_f9e7831d-e68a-402f-867b-15ff7b1edf25" id="sec.232-ssec.2-note-he">Editor’s note—</heading><block><txt break.before="1"><legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.12" target.doc.id="act-2004-025" target.guid="_27e89a9e-1acd-4e56-96fc-dd3712c2ec2a" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">chapter 12</legref> and <legref check="valid" jurisd="QLD" refid="sch.1" target.doc.id="act-2004-025" target.guid="_7e30dc7a-6468-45ca-86c4-41e9b141965e" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">schedule 1</legref> (Reviews and appeals)</txt></block></note></block></subclause></clause></part></chapter><chapter affected.by.uncommenced="0" guid="_c200371d-7276-455f-ab31-e74d811368e1" id="ch.5"><no>Chapter 5</no><heading guid="_72e35480-cb64-4aff-889e-47f451b7f0d2" id="ch.5-he">General provisions for GHG authorities</heading><part affected.by.uncommenced="0" guid="_2004d251-6225-409e-b4d1-523114b394d9" id="ch.5-pt.1"><no>Part 1</no><heading guid="_c6ac9ce6-c1b9-422c-a6e2-062ec228afc5" id="ch.5-pt.1-he">GHG injection and storage data acquisition authorities</heading><division affected.by.uncommenced="0" guid="_f4dca466-01bc-4f3b-8d35-1f463e7413c1" id="ch.5-pt.1-div.1"><no>Division 1</no><heading guid="_c69fda8a-5a9e-4117-9565-82c8ef8ea3b2" id="ch.5-pt.1-div.1-he">Obtaining authority</heading><clause affected.by.uncommenced="0" guid="_25064f82-f49b-412a-9a07-c5c13659fe8f" id="sec.233" provision.type="other" spent.amends="0"><no>233</no><heading guid="_d58228a3-c9c5-4cdf-ae7e-4c73dc845738" id="sec.233-he">Who may apply for GHG data acquisition authority</heading><subclause affected.by.uncommenced="0" guid="_30171cca-258b-425a-bb3c-c62dfd9c18f0" id="sec.233-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A GHG tenure holder may apply for a GHG data acquisition authority to allow the applicant to carry out the following activities (<defterm guid="_7f97eda6-f3a7-41fb-88cb-2b7bc272123d" id="sec.233-def.dataacquisitionactivities" type="definition">data acquisition activities</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d30fe454-fd50-49be-b6cb-c60751d0b2c1" id="sec.233-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">geophysical surveys on land (the <defterm guid="_9f7cdf38-6912-4ebf-b7a6-56eb3b2b153d" id="sec.233-ssec.1-def.dataacquisitionland" type="definition">data acquisition land</defterm>) contiguous to land in the GHG tenure’s area to enable the applicant to acquire data relevant to authorised activities under the tenure;</txt></block></li><li guid="_13f26828-e3cd-4054-8d7e-fd8f3f1fa6fc" id="sec.233-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the entering of the data acquisition land to carry out the geophysical surveys.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8f2f3fa0-c270-4094-96c7-54a2f54e7935" id="sec.233-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the application can not be made or granted for land in the area of another GHG tenure.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7bf9b42d-6ab4-42e8-b76d-7f8ce6ce8fab" id="sec.233-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The GHG tenure mentioned in <intref check="valid" refid="sec.233-ssec.1" target.guid="_30171cca-258b-425a-bb3c-c62dfd9c18f0">subsection (1)</intref> is the <defterm guid="_ed0994b4-243b-4b41-9f00-059becdebb32" id="sec.233-def.relevantGHGtenure" type="definition">relevant GHG tenure</defterm> for the GHG data acquisition authority or proposed GHG data acquisition authority.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d1245bbf-ddf8-4883-be21-8695867a614c" id="sec.234" provision.type="other" spent.amends="0"><no>234</no><heading guid="_96f114af-380f-4c19-a90f-bd4000df6427" id="sec.234-he">Requirements for making application</heading><block><txt break.before="1">The application must be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_058e1d37-2b41-4b20-a60b-3b2d77422473" id="sec.234-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">made to the Minister in the approved form; and</txt></block></li><li guid="_4f7f57d1-8757-4753-a2af-06cf27ff8e71" id="sec.234-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">accompanied by the fee prescribed under a regulation.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_1ce2f877-d875-4bea-8f7a-92c49c29a63a" id="sec.235" provision.type="other" spent.amends="0"><no>235</no><heading guid="_437f2775-f955-4b39-9d10-91b84ade3ecf" id="sec.235-he">Deciding application</heading><subclause affected.by.uncommenced="0" guid="_d5bb4cc7-5dc8-4136-9df0-56de27f64131" id="sec.235-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may grant or refuse the GHG data acquisition authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f0932c60-886f-45e9-8f9f-d28f73d992f8" id="sec.235-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the GHG data acquisition authority can not be granted unless a relevant environmental authority has been issued.</txt><note guid="_80171522-182e-4e5a-aa06-40e6e1bfdd67" id="sec.235-ssec.2-note" type="example"><heading guid="_07598956-8363-4050-a5b2-43d34c5e63f9" id="sec.235-ssec.2-note-he">Note—</heading><block><txt break.before="1">If the application relates to acquired land, see also <intref check="valid" refid="sec.369C" target.guid="_5d318eda-c04e-41c4-927c-5bfccbc8d0f8">section 369C</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_be942fc7-3984-4922-9749-7cb92f6b9fd6" id="sec.235-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister may as a condition of deciding to grant the GHG data acquisition authority, require the applicant to do all or any of the following within a stated reasonable period—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_33556fb0-f189-414b-85b9-f1292bea1f8c" id="sec.235-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">pay the annual rent for the GHG data acquisition authority;</txt></block></li><li guid="_c3ea5493-bde7-4ab2-9d66-ba1521434972" id="sec.235-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give under <intref check="valid" refid="sec.271" target.guid="_189844e5-1f2b-472b-a0aa-286d65029d9a">section 271</intref>, security for the GHG data acquisition authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b1c1d5ed-310c-44a0-b179-7bbec59d28d0" id="sec.235-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the applicant does not comply with the requirement, the application may be refused.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_6bdb4ac1-2c6f-407e-ae24-244e12e561f6" id="sec.236" provision.type="other" spent.amends="0"><no>236</no><heading guid="_9d6463b7-787b-4288-b332-4c63361a8ad7" id="sec.236-he">Provisions of authority</heading><subclause affected.by.uncommenced="0" guid="_c7b69bb8-6960-4ee1-bcd6-db65db061600" id="sec.236-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A GHG data acquisition authority must state its term and area.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b3a8ac81-ba76-41f5-b9a7-2947ace3e930" id="sec.236-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The term must end no later than 1 year after the authority takes effect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a7d9bf76-88e8-44a7-9c6e-f5b0ff098e10" id="sec.236-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The GHG data acquisition authority may also state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_32ef3c4f-5723-4948-a41c-a8db6ab4c765" id="sec.236-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">conditions or other provisions of the GHG data acquisition authority other than conditions or provisions that are—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_72891989-d8d4-4086-8c79-931384076cea" id="sec.236-ssec.3-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">inconsistent with <intref check="valid" refid="sec.238" target.guid="_73d3518e-cd0a-406a-8578-0cf0ea9706bb">section 238</intref>, <intref check="valid" refid="sec.239" target.guid="_ca083747-feaa-44cd-8cf2-bfaaf1b8e48c">239</intref> or <intref check="valid" refid="sec.243" target.guid="_52c33ef1-f6c8-4fd6-81fe-85fb4ee3873c">243</intref> or any other mandatory condition for data acquisition authorities; or</txt><note guid="_ae11ba1e-4f36-48b2-a810-3df0e6b7d81f" id="sec.236-ssec.3-para1.a-para2.i-note" type="example"><heading guid="_1a458b04-d290-4c38-9514-ed00f95a7b8c" id="sec.236-ssec.3-para1.a-para2.i-note-he">Note—</heading><block><txt break.before="1">Other provisions of this chapter also impose mandatory conditions on data acquisition authorities. See, in particular, <intref check="valid" refid="ch.5-pt.12" target.guid="_1522b152-04be-4326-95f6-52b27402695b">part 12</intref>.</txt></block></note></block></li><li guid="_1ccfefb7-9320-474b-b5ee-d1d71a4c1a12" id="sec.236-ssec.3-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">inconsistent with a condition of the relevant GHG tenure; or</txt></block></li><li guid="_104c89c2-b3de-47fd-91d5-2a1ee8f98e62" id="sec.236-ssec.3-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the same as or substantially the same as or inconsistent with any relevant environmental condition; and</txt></block></li></list></block></li><li guid="_5b103cf2-365c-4c10-b323-caa4f3961660" id="sec.236-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the day it takes effect.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_cd44578d-598a-4edb-8b43-9e4eb26a5105" id="sec.236-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, the provisions of the GHG data acquisition authority may exclude or restrict the carrying out of data acquisition activities.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0c0b3d3c-7541-4d7e-b310-55c40f13fe76" id="sec.237" provision.type="other" spent.amends="0"><no>237</no><heading guid="_428ec90c-9301-46e9-9837-ab888bb61a8f" id="sec.237-he">Notice of refusal</heading><block><txt break.before="1">If the Minister decides to refuse the application, the Minister must give the applicant notice of the decision.</txt></block></clause></division><division affected.by.uncommenced="0" guid="_5126b00b-5656-4257-afc6-cff9b98b1e66" id="ch.5-pt.1-div.2"><no>Division 2</no><heading guid="_1ab97415-5669-40c7-ba69-09f2b4e3701e" id="ch.5-pt.1-div.2-he">Provisions for GHG data acquisition authorities</heading><clause affected.by.uncommenced="0" guid="_73d3518e-cd0a-406a-8578-0cf0ea9706bb" id="sec.238" provision.type="other" spent.amends="0"><no>238</no><heading guid="_36d5bb0f-7b1f-4fda-a7b5-69028b22aeea" id="sec.238-he">Key authorised activities</heading><block><txt break.before="1">A GHG data acquisition authority authorises its holder to carry out data acquisition activities in the authority’s area.</txt><note guid="_72a89aaa-5915-490c-995c-8027194c4c76" id="sec.238-note" type="example"><heading guid="_7149da90-5d42-4ef2-9255-d03c5bde4496" id="sec.238-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_aadf7591-73da-44f1-acef-98590c364f26" id="sec.238-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">For other authorised activities, see <intref check="valid" refid="ch.5-pt.12" target.guid="_1522b152-04be-4326-95f6-52b27402695b">part 12</intref> and the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-2014-047" target.guid="_78e7ee55-dcff-4087-b0b9-13497e839af3" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">chapter 3</legref>, <legref check="valid" jurisd="QLD" refid="ch.3-pt.2" target.doc.id="act-2014-047" target.guid="_adcc85c6-c389-49c8-b998-858dca31ac1f" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">part 2</legref>, <legref check="valid" jurisd="QLD" refid="ch.3-pt.2-div.4" target.doc.id="act-2014-047" target.guid="_e1353372-233b-4244-80ae-a5473476fdc0" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">division 4</legref>.</txt></block></li><li guid="_14c0c674-37e7-48ff-b673-1d016702c898" id="sec.238-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">For general restrictions on authorised activities, their relationship with owners’ and occupiers’ rights and who may carry out authorised activities for a GHG authority holder, see <intref check="valid" refid="ch.5-pt.12" target.guid="_1522b152-04be-4326-95f6-52b27402695b">part 12</intref>, <intref check="valid" refid="ch.5-pt.12-div.3" target.guid="_52e9113b-f38f-4392-a865-e39e2e512683">division 3</intref>.</txt></block></li><li guid="_b1e2ab93-8d81-435c-8065-01b57de032ec" id="sec.238-note-para1.3" provision.type="other"><no>3</no><block><txt break.before="0">The carrying out of particular activities on particular land in the GHG data acquisition authority’s area may not be authorised following the taking of the land under a resumption law. See <intref check="valid" refid="sec.369B" target.guid="_d9b1575e-7c2a-404c-9b3e-19f30c1ce1e6">section 369B</intref>.</txt></block></li></list></block></note></block></clause><clause affected.by.uncommenced="0" guid="_ca083747-feaa-44cd-8cf2-bfaaf1b8e48c" id="sec.239" provision.type="other" spent.amends="0"><no>239</no><heading guid="_08aed7ba-c523-47b9-86bc-f85e636f73f2" id="sec.239-he">Additional condition of relevant GHG tenure</heading><block><txt break.before="1">If a condition is imposed on a GHG data acquisition authority (the <defterm guid="_2496ffd9-f9b1-4dd5-b786-3d220eadc619" id="def.authoritycondition" type="definition">authority condition</defterm>), it is a condition of the relevant GHG tenure that the tenure holder must comply with the authority condition.</txt></block></clause><clause affected.by.uncommenced="0" guid="_1a071fc4-a9cc-41ac-94cf-291648157d60" id="sec.240" provision.type="other" spent.amends="0"><no>240</no><heading guid="_aff4f6a4-1dc0-4b4a-9854-335778976d22" id="sec.240-he">Authority holder is the relevant GHG tenure holder from time to time</heading><block><txt break.before="1">The holder of a GHG data acquisition authority is taken to be the person who, from time to time, holds the relevant GHG tenure.</txt></block></clause><clause affected.by.uncommenced="0" guid="_d9089c80-b2c1-4465-92b6-292ee1464da9" id="sec.241" provision.type="other" spent.amends="0"><no>241</no><heading guid="_9736f83a-49f4-41b0-bd06-37075283826a" id="sec.241-he">Authority ends if relevant GHG tenure ends</heading><subclause affected.by.uncommenced="0" guid="_e10da71e-2e5b-4919-a910-df262fdb270a" id="sec.241-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A GHG data acquisition authority ends if the relevant GHG tenure ends.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8b0cde64-f188-419b-a109-66c246e24e85" id="sec.241-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.241-ssec.1" target.guid="_e10da71e-2e5b-4919-a910-df262fdb270a">Subsection (1)</intref> applies subject to any noncompliance action taken for the GHG data acquisition authority or the relevant GHG tenure.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d60b475e-ae85-4130-8eb3-cb4897ce22a2" id="sec.242" provision.type="other" spent.amends="0"><no>242</no><heading guid="_6410d146-de87-48ed-9e39-4a90a590b772" id="sec.242-he">Relationship with subsequent GHG tenure</heading><subclause affected.by.uncommenced="0" guid="_b3794625-91a2-492b-a7e7-2738a11816f4" id="sec.242-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a GHG tenure is granted over land in the area of a GHG data acquisition authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_38505112-e848-4af4-a43f-4f8dd6404ce6" id="sec.242-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The grant does not limit the GHG data acquisition authority or its term.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4be79075-d4e6-4be7-a24e-deb6d7cc443c" id="sec.242-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, an authorised activity for the GHG data acquisition authority may be carried out on the land only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6686e585-bad2-4ae9-aafc-b4d0c491f0a9" id="sec.242-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">carrying out the activity does not adversely affect the carrying out of an authorised activity for the GHG tenure; or</txt></block></li><li guid="_70e9e0f6-3991-4b37-83f7-9148eb17c701" id="sec.242-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the agreement conditions have been complied with.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f49d0451-84f1-4317-8074-f30725314e07" id="sec.242-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_6dae483c-2581-4f3b-b52f-61a630c3d314" id="sec.242-ssec.4-def.agreementconditions_"><txt break.before="1"><defterm guid="_e5c1136b-7a98-4c6e-855a-9b38f380629a" id="sec.242-ssec.4-def.agreementconditions" type="definition">agreement conditions</defterm> means that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a7150dd3-4d1b-411a-b403-15796c048c0e" id="sec.242-ssec.4-def.agreementconditions-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the GHG tenure holder has agreed in writing to the carrying out of the activity; and</txt></block></li><li guid="_be607c8d-088b-48d9-b194-71dadfdd23c4" id="sec.242-ssec.4-def.agreementconditions-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a copy of the agreement has been given to the chief executive; and</txt></block></li><li guid="_4c671416-ac1c-49b8-88aa-8df46f2d5a9d" id="sec.242-ssec.4-def.agreementconditions-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the agreement is still in force.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_52c33ef1-f6c8-4fd6-81fe-85fb4ee3873c" id="sec.243" provision.type="other" spent.amends="0"><no>243</no><heading guid="_a70af890-24ac-41c1-9b62-34745e88dbb8" id="sec.243-he">Annual rent</heading><subclause affected.by.uncommenced="0" guid="_3052c578-a799-4a25-9823-4c0aaa3e7010" id="sec.243-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A GHG data acquisition authority holder must pay the State the rent as prescribed under a regulation.</txt><note guid="_3edaa47a-5183-412c-8a05-ed0dfe77cdc5" id="sec.243-ssec.1-note" type="example"><heading guid="_7e03bcc6-6915-423d-a668-4f913c3a9ca6" id="sec.243-ssec.1-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.372" target.guid="_cdf19c9f-040c-4850-bb53-64da3212970f">section 372</intref> (Interest on amounts owing to the State).</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_734fee57-e838-4066-8f71-604a20fa0056" id="sec.243-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The rent must be paid in the way, and on or before the day, prescribed under a regulation.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f0c17c09-b722-4696-b154-54fe21593d88" id="sec.244" provision.type="other" spent.amends="0"><no>244</no><heading guid="_5ae7d0f1-5fb4-4b43-a624-028e05cf0429" id="sec.244-he">End of authority report for GHG data acquisition authority</heading><subclause affected.by.uncommenced="0" guid="_7d7d14cf-a37b-49a2-8153-314bdd04e722" id="sec.244-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a data acquisition authority ends.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4ca5b8a9-2563-4ec1-9e2c-1e7197f8c56c" id="sec.244-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The person who held the authority immediately before it ended must, within 6 months give in the required way the chief executive a report relating to the former authority about the matters mentioned in <intref check="valid" refid="sec.259" target.guid="_f35e81e9-eaab-490f-9dd9-f7a5f89d057e">section 259</intref>.</txt></block><penalty guid="_145d1bbf-7244-4690-a50e-d99af16866e0" id="sec.244-ssec.2-pen"><block><txt break.before="1">Maximum penalty—150 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_efb6d917-88d8-48b9-9064-ba50dae18186" id="sec.244-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.244-ssec.2" target.guid="_4ca5b8a9-2563-4ec1-9e2c-1e7197f8c56c">subsection (2)</intref> applies only to the extent the matters are relevant to the former authority.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_69b1bade-99be-45b4-8d19-3346670b541b" id="ch.5-pt.2"><no>Part 2</no><heading guid="_56938e63-fc1a-41dc-a64d-3aec1d3004de" id="ch.5-pt.2-he">GHG storage viability assessment</heading><clause affected.by.uncommenced="0" guid="_97a0f17b-84e5-42b4-aca8-41c499529aeb" id="sec.245" provision.type="other" spent.amends="0"><no>245</no><heading guid="_81e9062f-607f-4666-bf0e-ffcb641e9f46" id="sec.245-he">Minister’s power to require GHG storage viability report</heading><subclause affected.by.uncommenced="0" guid="_4a84fb6c-726f-4c70-97d0-710b9e316bc8" id="sec.245-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may by notice (a <defterm guid="_6f8eb653-0503-4c34-88c2-4904df7711f2" id="sec.245-def.reportrequirement" type="definition">report requirement</defterm>) require a GHG tenure holder to give the Minister a report (a <defterm guid="_d0e9b37a-7e9a-48f0-89f8-7027f10db4bb" id="sec.245-def.GHGstorageviabilityreport" type="definition">GHG storage viability report</defterm>) about all or a stated part of its area if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_88ee6c0f-88d3-44a0-b4a5-bc156050a25d" id="sec.245-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the holder is not carrying out GHG storage exploration or GHG stream storage in the area or stated part; and</txt></block></li><li guid="_394e0db8-1597-4dbc-80ca-232f4583a645" id="sec.245-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Minister is of the opinion that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9c3921ae-74a8-4351-9c0a-4cef2a2569cb" id="sec.245-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">it is viable to carry out GHG stream storage in the area or stated part; or</txt></block></li><li guid="_0be6b2c4-277a-4f07-bdef-c45d7daf1680" id="sec.245-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">it may be viable to carry out GHG stream storage in the area or stated part within 10 years.</txt><note guid="_9689f2c3-8b80-4b01-8591-35cf1c10384a" id="sec.245-ssec.1-para1.b-para2.ii-note" type="example"><heading guid="_8cf9570c-12e7-4de5-98a2-8ee9251faba7" id="sec.245-ssec.1-para1.b-para2.ii-note-he">Note—</heading><block><txt break.before="1">For the relevance of this period, see <intref check="valid" refid="sec.102" target.guid="_fe02bb19-e4c6-4a70-83c5-95744af34884">section 102</intref> (Deciding potential storage area application).</txt></block></note></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f957c2b3-897d-45ba-9ba0-8927f85928db" id="sec.245-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must state each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c3d860d7-24c1-43f8-b5ac-8cbc37a7f7c4" id="sec.245-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the Minister’s opinion under <intref check="valid" refid="sec.245-ssec.1" target.guid="_4a84fb6c-726f-4c70-97d0-710b9e316bc8">subsection (1)</intref><intref check="valid" refid="sec.245-ssec.1-para1.b" target.guid="_394e0db8-1597-4dbc-80ca-232f4583a645">(b)</intref><intref check="valid" refid="sec.245-ssec.1-para1.b-para2.i" target.guid="_9c3921ae-74a8-4351-9c0a-4cef2a2569cb">(i)</intref> or <intref check="valid" refid="sec.245-ssec.1-para1.b-para2.ii" target.guid="_0be6b2c4-277a-4f07-bdef-c45d7daf1680">(ii)</intref>;</txt></block></li><li guid="_0266e580-e7c8-48eb-ba69-9c3e2383a6a3" id="sec.245-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the facts and circumstances forming the basis for the opinion;</txt></block></li><li guid="_cf856117-2a53-4d2f-b391-78f4c5d6b601" id="sec.245-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that the Minister requires the holder to give the Minister a GHG storage viability report about the area;</txt></block></li><li guid="_35676e44-6f6b-49cb-8a82-fc9963e5340e" id="sec.245-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a reasonable period for giving the report.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_12eaec3a-cdbd-47ca-9eec-f66281033392" id="sec.246" provision.type="other" spent.amends="0"><no>246</no><heading guid="_f5a356a2-0650-4e37-8e41-218baf67766c" id="sec.246-he">Required content of GHG storage viability report</heading><subclause affected.by.uncommenced="0" guid="_92a8501b-d439-4190-99db-ce9257ee7bc5" id="sec.246-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A GHG storage viability report must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_26f6b722-422b-43cc-9cbb-94363143a581" id="sec.246-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">identify each GHG storage reservoir in the area the subject of the relevant report requirement; and</txt></block></li><li guid="_fcb10691-aaee-4af1-b657-900abe5c32c7" id="sec.246-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state whether in the opinion of the relevant GHG tenure holder, it is currently viable to carry out GHG stream storage in the area; and</txt></block></li><li guid="_c35d0ccd-5148-4606-b8d8-eef0089cbb25" id="sec.246-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the holder’s opinion is that it is not viable to carry out GHG stream storage in the area, state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3660d389-4935-4368-9d81-589933b5ebe3" id="sec.246-ssec.1-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">whether in the holder’s opinion, it may at any time in the future be viable to carry out GHG stream storage in the area; and</txt></block></li><li guid="_32b3b08d-44de-46f0-ad41-d61a4bc9759d" id="sec.246-ssec.1-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the opinion is that it may at some time in the future be viable to carry out GHG stream storage in the area—the holder’s assessment of when that time may be; and</txt></block></li></list></block></li><li guid="_9b6fb874-b151-4a70-995a-27da9b6463c5" id="sec.246-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">give data, and an analysis of the data, that supports each opinion.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_4b38679c-4103-43e3-b25a-c78fb827906a" id="sec.246-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The supporting data and analysis must include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fcae2f74-2b41-4e31-a584-6fdb0e6507f9" id="sec.246-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">technical data relating to the geology of GHG storage reservoirs in the area; and</txt></block></li><li guid="_11c22c1f-a6ca-41e0-bb04-a61de400d6af" id="sec.246-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">market and financial data relevant to the opinions.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f0961cf8-57fc-4a95-b754-ffb77d8bff34" id="sec.247" provision.type="other" spent.amends="0"><no>247</no><heading guid="_9917e7c6-d60e-41cb-b2ea-eca49c0b944e" id="sec.247-he">Minister’s power to obtain independent viability assessment</heading><subclause affected.by.uncommenced="0" guid="_408d4b83-7c59-4468-a99f-228c1259b0f1" id="sec.247-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies for a GHG tenure, whether or not its holder has given a GHG storage viability report about the tenure.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_de1adac7-f47f-42eb-961e-4ea73debb62e" id="sec.247-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister may obtain an independent assessment of the viability of carrying out GHG stream storage in all or part of the GHG tenure’s area (an <defterm guid="_2f7ae239-17d0-4625-a629-bf15c0eb5229" id="sec.247-def.independentviabilityassessment" type="definition">independent viability assessment</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_99230ea1-da4a-47c2-aa2b-28a10deeed3f" id="sec.247-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, before seeking the assessment, the Minister must give the holder a notice stating each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_46d8bd08-88cc-43a6-b9d6-10caf4a06870" id="sec.247-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that the Minister proposes to obtain the assessment;</txt></block></li><li guid="_f4741e04-80a5-493c-9d72-634b86989eba" id="sec.247-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Minister’s reasons for seeking the assessment;</txt></block></li><li guid="_90f6f8f9-64ea-44e2-bce7-1cd1a4d50a5d" id="sec.247-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">whether the State will under <intref check="valid" refid="sec.248" target.guid="_d3e001d5-a6f0-446c-a235-3cf0f5e2fce7">section 248</intref>, seek to recover the costs of the assessment;</txt></block></li><li guid="_4fa77e24-ad99-4a80-88be-f5fe71a1b68f" id="sec.247-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">that the holder may within a stated reasonable period make submissions to the Minister about the proposed assessment.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e21c4677-37b4-4b69-8dd3-1f58c0700cc7" id="sec.247-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The Minister must consider any submissions made under <intref check="valid" refid="sec.247-ssec.3" target.guid="_99230ea1-da4a-47c2-aa2b-28a10deeed3f">subsection (3)</intref><intref check="valid" refid="sec.247-ssec.3-para1.d" target.guid="_4fa77e24-ad99-4a80-88be-f5fe71a1b68f">(d)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9d651517-7d82-42a7-8414-e907b03d5e48" id="sec.247-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The Minister must after receiving the assessment, give the holder a copy.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d3e001d5-a6f0-446c-a235-3cf0f5e2fce7" id="sec.248" provision.type="other" spent.amends="0"><no>248</no><heading guid="_6a0a770c-eb62-4069-8e64-467eab23883f" id="sec.248-he">Costs of independent viability assessment</heading><block><txt break.before="1">If—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b2fc9002-9525-4398-bd11-e98b69dd22c4" id="sec.248-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the Minister has incurred costs in obtaining under <intref check="valid" refid="sec.247" target.guid="_f0961cf8-57fc-4a95-b754-ffb77d8bff34">section 247</intref>, an independent viability assessment about a GHG tenure; and</txt></block></li><li guid="_9ffa01bd-da06-498b-acbc-700cab87f55f" id="sec.248-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the notice under <intref check="valid" refid="sec.247" target.guid="_f0961cf8-57fc-4a95-b754-ffb77d8bff34">section 247</intref> about the assessment stated that the State will seek to recover the costs; and</txt></block></li><li guid="_49f5ebb2-9754-49b7-b0a6-d91ab3d38ab2" id="sec.248-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the Minister has given the GHG tenure holder a notice requiring the holder to pay a reasonable amount for the costs;</txt></block></li></list></block><block><txt break.before="1">the holder must pay the State a reasonable amount for the costs.</txt></block></clause></part><part affected.by.uncommenced="0" guid="_44d07226-e1cc-4b00-97e3-7e6ccde82da5" id="ch.5-pt.3"><no>Part 3</no><heading guid="_f063701a-9aef-42f1-b6fd-c5683595313e" id="ch.5-pt.3-he">Ownership and decommissioning of GHG stream pipelines</heading><clause affected.by.uncommenced="0" guid="_611cfff6-3d80-40d6-b912-70b691c07fd2" id="sec.249" provision.type="other" spent.amends="0"><no>249</no><heading guid="_f5dd7679-438e-4b25-a7ac-fe16afbecf10" id="sec.249-he">Application of <intref check="valid" refid="ch.5-pt.3" target.guid="_44d07226-e1cc-4b00-97e3-7e6ccde82da5">pt 3</intref></heading><block><txt break.before="1">This part applies for a pipeline constructed or operated under a GHG tenure.</txt><note guid="_df05de7c-647c-4e81-ac1f-29f821d96242" id="sec.249-note" type="example"><heading guid="_8ae1f10d-0b5a-46b3-8d7a-72064e8c306d" id="sec.249-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="sec.31" target.guid="_89f6a548-55bd-4305-9c49-bc4abc700a6b">sections 31</intref> (Incidental activities) and <intref check="valid" refid="sec.111" target.guid="_c90aba78-f99d-4d2b-b22e-91c152678ee0">111</intref> (GHG stream pipeline and water pipeline construction and operation).</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_da37b1ef-16e2-44ef-a499-7e148e9cf5ea" id="sec.250" provision.type="other" spent.amends="0"><no>250</no><heading guid="_2c4920bc-9b1d-4ede-b9c7-962ef14ef855" id="sec.250-he">General provision about ownership while tenure is in force for pipeline</heading><subclause affected.by.uncommenced="0" guid="_5c0e5020-8548-4919-9e2c-1047c5b24c3f" id="sec.250-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies while the land on which the pipeline is constructed is, and continues to be, in the GHG tenure’s area.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6deb5941-812a-4972-931d-c3f83b87f113" id="sec.250-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The pipeline is taken to be the personal property of the holder of the GHG tenure.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5db670ec-1ae4-4840-9212-3b1506cbc0ac" id="sec.250-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The pipeline remains the holder’s personal property despite—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_595ddc37-049f-4fd2-9909-dd6a9964b6a2" id="sec.250-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">it having become part of the land; or</txt></block></li><li guid="_1244459d-9147-4a24-87e4-74f0ad5c2b6d" id="sec.250-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the sale or other disposal of the land.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_99c8fdd6-b4c1-4c0f-9018-6d4154635aea" id="sec.250-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The pipeline can not be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1144adb1-e949-44bf-851e-fd96e1b46735" id="sec.250-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">levied or seized in execution; or</txt></block></li><li guid="_9734ea1f-cef3-4d7b-9bf3-9fdf0bdc3bad" id="sec.250-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">sold in exercise of a power of sale or otherwise disposed of by a process under a law of a State taken against the holder or the owner of the land.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9088c1a8-5ac8-48d2-a546-248b01d0c86b" id="sec.250-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0"><intref check="valid" refid="sec.250-ssec.2" target.guid="_6deb5941-812a-4972-931d-c3f83b87f113">Subsections (2)</intref> to <intref check="valid" refid="sec.250-ssec.4" target.guid="_99c8fdd6-b4c1-4c0f-9018-6d4154635aea">(4)</intref> apply despite—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bef276bc-33c2-4c1c-bf7a-5c478ac16308" id="sec.250-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an Act or law of a State; or</txt></block></li><li guid="_000b9ec8-fedd-4431-b132-5598d0155347" id="sec.250-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a contract, covenant or claim of right under a law of a State.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2a79907e-157e-45ed-aba9-6bfe1c00b815" id="sec.251" provision.type="other" spent.amends="0"><no>251</no><heading guid="_b67096f3-1122-4309-9f23-6186b241aaa0" id="sec.251-he">Ownership afterwards</heading><subclause affected.by.uncommenced="0" guid="_bd0c10f7-5d1c-4fd0-8396-854e44cb48eb" id="sec.251-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the GHG tenure (the <defterm guid="_6c603a78-4638-40e9-8acf-29a77a5318a2" id="sec.251-def.originaltenure" type="definition">original tenure</defterm>) ends or the land on which the pipeline is constructed ceases to be in the original tenure’s area.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_035b30cc-e078-497c-83dd-4f917ba63cb2" id="sec.251-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.250" target.guid="_da37b1ef-16e2-44ef-a499-7e148e9cf5ea">Section 250</intref> applies and continues to apply for the pipeline and for any subsequent GHG tenure to the original tenure or pipeline licence for the pipeline.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2f741ec5-f97f-4e2a-afec-c38ebcc6332c" id="sec.251-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the application of <intref check="valid" refid="sec.250" target.guid="_da37b1ef-16e2-44ef-a499-7e148e9cf5ea">section 250</intref> is subject to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4a9ebf7c-59d8-47b2-b5f0-f6c225ab4de7" id="sec.251-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0"><intref check="valid" refid="sec.356" target.guid="_a963356b-31d0-46d1-ad14-0cf2ffeb6138">section 356</intref>; and</txt></block></li><li guid="_e0b0c72a-7226-4357-bf50-4186dc0d49a0" id="sec.251-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any condition of the former tenure.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8e43693e-0f58-4680-8a3b-1af064cc10ed" id="sec.251-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Also, if the pipeline is decommissioned under <intref check="valid" refid="sec.252" target.guid="_e552a73b-b0b7-4f27-8241-11a39215c7a3">section 252</intref> the following person may dispose of it to anyone else—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3fc16347-0963-4ca8-8b37-abe343c0cd3b" id="sec.251-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if no subsequent GHG tenure was granted for the land—the holder or former holder of the original tenure;</txt></block></li><li guid="_72f90dff-d1b5-45fe-bff6-caff1836bfb8" id="sec.251-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if a subsequent GHG tenure was granted for the land—the holder or former holder of that tenure.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e552a73b-b0b7-4f27-8241-11a39215c7a3" id="sec.252" provision.type="other" spent.amends="0"><no>252</no><heading guid="_d116ce72-5f58-47b7-ade4-e50689f6ee3e" id="sec.252-he">Obligation to decommission pipelines on cessation or reduction of tenure</heading><subclause affected.by.uncommenced="0" guid="_6dd586bf-0652-42fc-bd2f-419f3274695c" id="sec.252-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The holder of a GHG tenure must before the decommissioning day, decommission in the way prescribed under a regulation any pipeline in the tenure’s area.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_08d7e94e-3d2e-4479-b7c2-9a8284226bbd" id="sec.252-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.252-ssec.1" target.guid="_6dd586bf-0652-42fc-bd2f-419f3274695c">subsection (1)</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a1393958-0041-440e-a10f-f1777147df80" id="sec.252-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">does not apply if the pipeline was constructed or operated under another GHG tenure or a petroleum authority; and</txt></block></li><li guid="_45bc3d39-b97e-4301-92ca-c2b58a856d5f" id="sec.252-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">ceases to apply if the operation of the pipeline becomes an authorised activity for another GHG tenure or a petroleum authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9c2f2e82-02e2-4669-9b6e-c570728ddc73" id="sec.252-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, <intref check="valid" refid="sec.252-ssec.1" target.guid="_6dd586bf-0652-42fc-bd2f-419f3274695c">subsection (1)</intref> does not apply for a pipeline if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6ef476be-e1c7-4377-9149-ea71975e8e8c" id="sec.252-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the pipeline was constructed or operated under a pipeline licence; and</txt></block></li><li guid="_0961e635-93a9-4fc3-81d9-4df660258453" id="sec.252-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the licence is under the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref>, surrendered or otherwise ends for the purpose of the pipelines the subject of the licence becoming the subject of another pipeline licence.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e9d3eb6b-cf91-4963-bd59-aaf291b0da93" id="sec.252-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_822cd78e-1368-4f14-8623-536dd34131a2" id="sec.252-ssec.4-def.decommissioningday_"><txt break.before="1"><defterm guid="_316eeb0e-d223-495f-84f9-5b865dde3917" id="sec.252-ssec.4-def.decommissioningday" type="definition">decommissioning day</defterm> means the latest of the following days—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5dac0bf6-856b-4d7f-a60a-d23b6fb6c24f" id="sec.252-ssec.4-def.decommissioningday-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the earlier of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ed428cb4-b480-4d42-9212-60305abd4948" id="sec.252-ssec.4-def.decommissioningday-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the day the GHG tenure ends;</txt></block></li><li guid="_336fd27a-cf39-4cbb-9320-707d21549639" id="sec.252-ssec.4-def.decommissioningday-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the day the land ceases to be in the GHG tenure’s area;</txt></block></li></list></block></li><li guid="_2ac2cfb8-0dc4-438b-b16b-1f32305af117" id="sec.252-ssec.4-def.decommissioningday-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if before the day provided for under <intref check="valid" refid="sec.252-ssec.4-def.decommissioningday-para1.a" target.guid="_5dac0bf6-856b-4d7f-a60a-d23b6fb6c24f">paragraph (a)</intref>, the Minister fixes a day—that day;</txt></block></li><li guid="_86831409-297e-4836-a1de-267a8bd35e5b" id="sec.252-ssec.4-def.decommissioningday-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if before a day fixed under <intref check="valid" refid="sec.252-ssec.4-def.decommissioningday-para1.b" target.guid="_2ac2cfb8-0dc4-438b-b16b-1f32305af117">paragraph (b)</intref>, the Minister fixes a later day—that day.</txt></block></li></list></definition></deflist></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_3c0547fd-122a-42d4-b2e8-a58e49dd221f" id="ch.5-pt.4"><no>Part 4</no><heading guid="_efaac46b-eb99-46e6-a5d0-02ebd4a29bf8" id="ch.5-pt.4-he">Reporting and information provisions</heading><division affected.by.uncommenced="0" guid="_73cdd174-0090-4166-964e-c9bbb445ce0e" id="ch.5-pt.4-div.1"><no>Division 1</no><heading guid="_cdb3dc90-7ced-4f61-9a3a-9516deb053d9" id="ch.5-pt.4-div.1-he">General reporting provisions</heading><clause affected.by.uncommenced="0" guid="_0a914bef-cb16-4521-a3e5-461cf1261113" id="sec.253" provision.type="other" spent.amends="0"><no>253</no><heading guid="_e65f65dd-5789-4798-8e18-e31ca5b19a90" id="sec.253-he">Requirement of GHG tenure holder to report outcome of GHG storage injection testing</heading><subclause affected.by.uncommenced="0" guid="_478aa613-1759-4f3c-b0eb-ad83ca300503" id="sec.253-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a GHG tenure holder carries out GHG storage injection testing.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e691c815-eb53-427a-9b10-549f6124a33d" id="sec.253-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The holder must within 40 business days after the testing ends give the chief executive a report stating the outcome of the testing.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6ccd8624-0dbb-49dd-895c-5c522c1ba1e7" id="sec.253-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The report must also state how much water was taken during the testing.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2a23560d-8f3b-497c-b43d-e05e0d77d6fd" id="sec.254" provision.type="other" spent.amends="0"><no>254</no><heading guid="_5522a556-f3d1-4268-921b-0b44dcaf08d4" id="sec.254-he">Monitoring reports by GHG lease holder</heading><subclause affected.by.uncommenced="0" guid="_a022555d-be13-44a3-9ab1-a36af7588d38" id="sec.254-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the holder of a GHG lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ef9d007e-c1cb-40be-b48e-5d1fffb4ca69" id="sec.254-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The holder must within 2 months after each of its anniversary days give each relevant chief executive a monitoring report for the 12 months that ended on the last anniversary day.</txt></block><penalty guid="_1f404f7d-3595-4ddd-88d4-b8de3b6c39e5" id="sec.254-ssec.2-pen"><block><txt break.before="1">Maximum penalty—150 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_20e49107-5317-4010-91cf-019706ddaf0c" id="sec.254-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Any relevant chief executive may by notice require the holder to within 30 business days give each relevant chief executive a monitoring report for the period since—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9c6cdcca-6a22-4687-b429-7cac0360ef3b" id="sec.254-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the holder last gave a monitoring report under <intref check="valid" refid="sec.254-ssec.2" target.guid="_ef9d007e-c1cb-40be-b48e-5d1fffb4ca69">subsection (2)</intref>; or</txt></block></li><li guid="_b57a4fc4-c870-49f7-b1cf-6b5a1cb676cd" id="sec.254-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if a monitoring report has not yet been required to be given under <intref check="valid" refid="sec.254-ssec.2" target.guid="_ef9d007e-c1cb-40be-b48e-5d1fffb4ca69">subsection (2)</intref>—the granting of the GHG lease.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f306d9a8-257b-4e20-b6b9-d463716a1852" id="sec.254-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The holder must comply with a notice given under <intref check="valid" refid="sec.254-ssec.3" target.guid="_20e49107-5317-4010-91cf-019706ddaf0c">subsection (3)</intref>.</txt></block><penalty guid="_ac612394-ccb7-4a2e-9280-5b78424bb6f8" id="sec.254-ssec.4-pen"><block><txt break.before="1">Maximum penalty—150 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_3b71f36c-8355-4500-a914-a3439559d4f1" id="sec.254-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_45c4ea79-d268-4e00-8cad-982ea64513ed" id="sec.254-ssec.5-def.anniversaryday_"><txt break.before="1"><defterm guid="_4d4511bb-854f-4bac-9f64-ab9f69355e30" id="sec.254-ssec.5-def.anniversaryday" type="definition">anniversary day</defterm>, for a GHG lease, means each day that is the anniversary of the day on which it took effect.</txt></definition><definition affected.by.uncommenced="0" guid="_46bb8800-e91d-4d9a-8f10-24d5b84f37a7" id="sec.254-ssec.5-def.monitoringreport_"><txt break.before="1"><defterm guid="_232141c1-c7de-4408-a791-edf072e6d0fa" id="sec.254-ssec.5-def.monitoringreport" type="definition">monitoring report</defterm> means a report about the expected migration pathway or pathways of GHG streams during and after injection into GHG storage reservoirs under the GHG lease.</txt></definition><definition affected.by.uncommenced="0" guid="_180f338c-a901-47e4-8712-eb60c015ca1c" id="sec.254-ssec.5-def.relevantchiefexecutive_"><txt break.before="1"><defterm guid="_d54e7c9f-7158-4747-9294-c63f9c64d1d9" id="sec.254-ssec.5-def.relevantchiefexecutive" type="definition">relevant chief executive</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0cd2365e-4d07-47c8-8cca-72fb3caba56f" id="sec.254-ssec.5-def.relevantchiefexecutive-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the chief executive of the department in which this Act is administered; or</txt></block></li><li guid="_ec205651-8259-453b-bc77-b917408392da" id="sec.254-ssec.5-def.relevantchiefexecutive-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the chief executive of the department in which the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act"><name emphasis="no">Environmental Protection Act</name></legref> is administered; or</txt></block></li><li guid="_620d7742-e922-4f6c-9a62-5bf816d05dd0" id="sec.254-ssec.5-def.relevantchiefexecutive-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the chief executive of the department in which the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref> is administered.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c71a3b14-1ff6-41ae-a3e2-86a31cddb36a" id="sec.255" provision.type="other" spent.amends="0"><no>255</no><heading guid="_efa47a2f-3117-499d-befa-15a5d73067a1" id="sec.255-he">Relinquishment report by GHG permit holder</heading><subclause affected.by.uncommenced="0" guid="_b153727c-d7e4-4a10-abf4-730d54be4a38" id="sec.255-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If part of the area of a GHG permit is relinquished as required or authorised under this Act, its holder must within 6 months give the chief executive a report that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ded830f4-ef16-43b8-9217-f6702e08ef3e" id="sec.255-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">describes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6cacfe53-8f33-4ca4-8188-fee38841eb8e" id="sec.255-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the authorised activities for the GHG permit carried out in the part; and</txt></block></li><li guid="_46940f30-89ec-4126-89e0-f69db3bfab7f" id="sec.255-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the results of the activities; and</txt></block></li></list></block></li><li guid="_50a3924a-eebc-4d72-935e-4a85697a352f" id="sec.255-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">includes other information prescribed under a regulation.</txt></block></li></list></block><penalty guid="_1ef05b22-d5e1-48ef-bde7-63f932b0ee33" id="sec.255-ssec.1-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_b6f9e3b7-9076-47ea-b7a9-87ec375f6fef" id="sec.255-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The report must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_03c8854c-96f6-4bb9-abc9-07730f5c2ae5" id="sec.255-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_83a9364e-95c5-4839-8557-b15710f4be1c" id="sec.255-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">given electronically using the system for submission of reports made or approved by the chief executive; and</txt></block></li><li guid="_9c3cf49b-da5d-4015-9fd1-8bd5a34fe8cf" id="sec.255-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">in the digital format made or approved by the chief executive; or</txt></block></li></list></block></li><li guid="_175a9017-4b82-499a-939f-3d6aa3222768" id="sec.255-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if a way of giving the report is prescribed under a regulation—be given in that way.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ce32a86c-e576-48f8-9bb7-ec56f0a8f97c" id="sec.255-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive must ensure the system and a document detailing the digital format made or approved by the chief executive are available for inspection on the department’s website.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4461835e-b583-4f2b-bcd0-8be46a1c77f3" id="sec.255-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The requirements under <intref check="valid" refid="sec.255-ssec.2" target.guid="_b6f9e3b7-9076-47ea-b7a9-87ec375f6fef">subsection (2)</intref> are the <defterm guid="_18a1fa9f-8f60-4ee1-8c29-138f24d18c43" id="sec.255-def.requiredway" type="definition">required way</defterm> for giving the chief executive reports.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_ad8db280-3630-4052-820d-5020dbe376a0" id="sec.256" provision.type="other" spent.amends="0"><no>256</no><heading guid="_aadf98f8-3c14-47bd-a153-e7ba10b3d102" id="sec.256-he">End of tenure report</heading><block><txt break.before="1">If a GHG tenure ends, the person who held the tenure immediately before it ended must, within 6 months, give the chief executive a report in the required way that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5b79522b-3f48-4dd9-b980-9cde7ba3c374" id="sec.256-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">includes all of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c88b5a84-81fc-48b3-9881-29e805936dda" id="sec.256-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a summary of all authorised activities for the GHG tenure carried out for the tenure since it took effect;</txt></block></li><li guid="_b5438c3e-2f70-4b7f-bca3-1e9d374d6e7e" id="sec.256-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a summary of the results of the activities;</txt></block></li><li guid="_47d26bd2-4679-4736-9fbf-4d42966af249" id="sec.256-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">an index of all reports given as required under this Act, for the activities;</txt></block></li><li guid="_faa2054a-b3e4-4f6f-9cf0-c58528f55ddb" id="sec.256-para1.a-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">a summary of all significant hazards created to future safe and efficient mining that under the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref> safety provisions, are required to be reported by the person;</txt></block></li><li guid="_9dea0599-46cb-49f4-9cf5-7df9cef4867d" id="sec.256-para1.a-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">for each hazard mentioned in the summary under <intref check="valid" refid="sec.256-para1.a-para2.iv" target.guid="_faa2054a-b3e4-4f6f-9cf0-c58528f55ddb">subparagraph (iv)</intref>—a reference to the report that contains details of the hazard;</txt></block></li><li guid="_b64459f3-682a-4241-a998-509a048f7bff" id="sec.256-para1.a-para2.vi" provision.type="other"><no>(vi)</no><block><txt break.before="0">information about the amount and location of GHG stream storage done in, and water produced from, the GHG tenure’s area;</txt></block></li><li guid="_2ca0992a-77a5-4d54-8369-3aaa7581bd57" id="sec.256-para1.a-para2.vii" provision.type="other"><no>(vii)</no><block><txt break.before="0">any information related to information mentioned in <intref check="valid" refid="sec.256-para1.a-para2.vi" target.guid="_b64459f3-682a-4241-a998-509a048f7bff">subparagraph (vi)</intref> that may help the understanding of the size or amount and location of any GHG stream storage sites in, or water that may be produced from, the area;</txt></block></li><li guid="_dfd152da-39ee-4d81-a976-a0d416a7767c" id="sec.256-para1.a-para2.viii" provision.type="other"><no>(viii)</no><block><txt break.before="0">any information required to be reported under this Act that has not been previously reported; and</txt></block></li></list></block></li><li guid="_b9a72514-39ea-4d4a-8b30-1035a4081f2f" id="sec.256-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">states any other information prescribed under a regulation.</txt></block></li></list></block><penalty guid="_65c44889-bea6-4682-8558-9754731e2afa" id="sec.256-pen"><block><txt break.before="1">Maximum penalty—150 penalty units.</txt></block></penalty></clause><clause affected.by.uncommenced="0" guid="_8ae05282-6abe-46c4-bab8-28c02ac6af0c" id="sec.257" provision.type="other" spent.amends="0"><no>257</no><heading guid="_3c8a5342-8b97-42e9-ba9b-1a2c24335093" id="sec.257-he">Power to require information or reports about authorised activities to be kept or given</heading><subclause affected.by.uncommenced="0" guid="_91add5bf-e8fa-46a1-ae96-604c819a7681" id="sec.257-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A regulation or the chief executive may for the services of the State require a GHG authority holder to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f9f12e73-9a7d-44fb-b4c9-e997adf43ebe" id="sec.257-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">keep in a stated way stated information or types of information about authorised activities carried out under the GHG authority; or</txt><note guid="_598645fa-f919-4d6b-8674-31a8e454c660" id="sec.257-ssec.1-para1.a-note" type="example"><heading guid="_ddfb385c-50a3-490d-a8c8-d0a9a4fe6a30" id="sec.257-ssec.1-para1.a-note-he">Example of a way of keeping information—</heading><block><txt break.before="1">in a stated digital format</txt></block></note></block></li><li guid="_9774cec4-2a6b-4534-8e3c-9138b187e50a" id="sec.257-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give the chief executive a notice in the approved form giving stated information or types of information or stated reports at stated times or intervals about authorised activities carried out under the GHG authority.</txt><note guid="_65889dae-4917-4936-87fd-af65f682fe96" id="sec.257-ssec.1-para1.b-note" type="example"><heading guid="_7dd0b0e8-dfe2-43e1-b53b-731b16d590af" id="sec.257-ssec.1-para1.b-note-he">Example of a stated time—</heading><block><txt break.before="1">for a report about a GHG well, 6 months after its completion</txt></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a9c6b860-1e54-454a-8cd1-083555a89a71" id="sec.257-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.257-ssec.1" target.guid="_91add5bf-e8fa-46a1-ae96-604c819a7681">subsection (1)</intref>, the information or report required to be given or kept may be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0c2e0991-6b74-44b4-828a-e9b66d05db66" id="sec.257-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">exploration data; or</txt></block></li><li guid="_4ab63137-57a3-4ad2-b575-7ae8b5aa2cd3" id="sec.257-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">opinions, conclusions, technical consolidations and advanced interpretations based on exploration data.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f3da14f5-1425-4797-bc6c-07c950c8dbbe" id="sec.257-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A notice by the chief executive under <intref check="valid" refid="sec.257-ssec.1" target.guid="_91add5bf-e8fa-46a1-ae96-604c819a7681">subsection (1)</intref><intref check="valid" refid="sec.257-ssec.1-para1.b" target.guid="_9774cec4-2a6b-4534-8e3c-9138b187e50a">(b)</intref> may state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_422fdbf4-1529-4aa9-b93d-48c7292b8ab9" id="sec.257-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a format required for giving the information; and</txt></block></li><li guid="_76dba97a-b22c-4579-b972-1f6e08b8e8aa" id="sec.257-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a degree of precision required for the giving of the information.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_cb3fb49f-3046-4857-88ec-a0f1c7d7c6dc" id="sec.257-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A person of whom a requirement under <intref check="valid" refid="sec.257-ssec.1" target.guid="_91add5bf-e8fa-46a1-ae96-604c819a7681">subsection (1)</intref> has been made must comply with the requirement.</txt></block><penalty guid="_95e7dc7b-f48f-43cf-b4c7-b6bcba860d00" id="sec.257-ssec.4-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_8e3d256b-a256-41b9-a234-ec4d61d03948" id="sec.257-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_ed355ef9-f5a7-47d2-8ac9-3f7668e8d5b8" id="sec.257-ssec.5-def.information_"><txt break.before="1"><defterm guid="_c6820009-1d54-4748-b55e-fad4f2a7978c" id="sec.257-ssec.5-def.information" type="definition">information</defterm> includes documents, records and samples.</txt></definition></deflist></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_b8c20690-5f9e-4428-affd-47186d563470" id="ch.5-pt.4-div.2"><no>Division 2</no><heading guid="_34131f81-d447-47bc-b99d-276f9b52b2f1" id="ch.5-pt.4-div.2-he">Records and samples</heading><clause affected.by.uncommenced="0" guid="_df6a3507-b2ce-4158-8284-dbebd9a31b0c" id="sec.258" provision.type="other" spent.amends="0"><no>258</no><heading guid="_d457dbb4-b455-4546-9286-ed38eb60077c" id="sec.258-he">Requirement to keep records and samples</heading><subclause affected.by.uncommenced="0" guid="_cc6b0491-d806-4f8a-adde-49bc6b9850bc" id="sec.258-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A GHG tenure holder must for the period and in the way prescribed under a regulation keep the records and samples about authorised activities carried out under the tenure as prescribed under a regulation.</txt></block><penalty guid="_ade407ec-18da-4940-802e-92eaace53929" id="sec.258-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_7758346e-39a9-4f39-9058-95c374915c71" id="sec.258-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.258-ssec.1" target.guid="_cc6b0491-d806-4f8a-adde-49bc6b9850bc">subsection (1)</intref>, the prescribed records may be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cb37ec65-8a1e-4ce5-9537-125b9cfb91bb" id="sec.258-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">exploration data; or</txt></block></li><li guid="_978682ba-49d6-4a63-8d08-4bf00ee1f1f6" id="sec.258-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">opinions, conclusions, technical consolidations and advanced interpretations based on exploration data.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f35e81e9-eaab-490f-9dd9-f7a5f89d057e" id="sec.259" provision.type="other" spent.amends="0"><no>259</no><heading guid="_79ba85a9-ffc1-4d87-8cba-d1c2b7e22961" id="sec.259-he">Requirement to give records and samples</heading><subclause affected.by.uncommenced="0" guid="_9f11d8f9-9380-4e61-a244-054f02c25c9e" id="sec.259-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person who under <intref check="valid" refid="sec.258" target.guid="_df6a3507-b2ce-4158-8284-dbebd9a31b0c">section 258</intref>, is required to keep a record or sample must for the services of the State give a copy of the record and a part of the sample to the chief executive within 6 months after the earlier of the following (the <defterm guid="_277b768a-7358-4101-ad51-4da6d5c614bd" id="sec.259-def.requiredtime" type="definition">required time</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7bdcde8a-7a94-4cc6-a5d2-f8f2aae69bf3" id="sec.259-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the day the record or sample was acquired or made;</txt></block></li><li guid="_915fefb9-0c0d-46b6-a5a7-16fededfb623" id="sec.259-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the day the relevant GHG tenure ends.</txt></block></li></list></block><penalty guid="_90898294-4f52-4a5a-8ba7-672a49d409e5" id="sec.259-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_ab8c413e-e650-4c4d-90ae-89f98c8bb31a" id="sec.259-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The copy of the record must be given in the required way for giving reports to the chief executive.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f3699143-806e-4826-82ff-f80bbd64a8ae" id="sec.259-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the chief executive gives the person a notice asking the person for more of the sample, the person must give it to the chief executive at the address stated in the notice within the reasonable time stated in the notice (also the <defterm guid="_0407339c-7f73-4b4e-ba64-61211fb76070" id="sec.259-def.requiredtime-oc.2" type="definition">required time</defterm>) unless the holder has a reasonable excuse.</txt></block><penalty guid="_de844cda-ddad-4da0-bc19-8738c4057d21" id="sec.259-ssec.3-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_97193423-3aab-438e-b083-209611189348" id="sec.259-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive may extend the required time by up to 1 year if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ac7853ee-56eb-429d-8283-c24f1f01090a" id="sec.259-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the person asks for the extension before the required time ends; and</txt></block></li><li guid="_9dedddbb-1add-4f6a-98ae-53dd60d3b8d6" id="sec.259-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the chief executive is satisfied the extension is necessary.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_dc0b1fc6-b6d4-4d8a-a49d-51461c483f35" id="sec.259-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">However, the extension must not end later than—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bf89cae3-a3aa-4242-b988-fd58c0869588" id="sec.259-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for <intref check="valid" refid="sec.259-ssec.1" target.guid="_9f11d8f9-9380-4e61-a244-054f02c25c9e">subsection (1)</intref>—6 months after the required time ends; or</txt></block></li><li guid="_894fe2cb-d165-4a15-918b-71fea87070cb" id="sec.259-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for <intref check="valid" refid="sec.259-ssec.3" target.guid="_f3699143-806e-4826-82ff-f80bbd64a8ae">subsection (3)</intref>—1 year after the required time ends.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a05c2bcf-1c49-4f0d-a1a1-1279d4cfc863" id="sec.259-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.259-ssec.1" target.guid="_9f11d8f9-9380-4e61-a244-054f02c25c9e">subsection (1)</intref>, the uses to which the State may put the copy of the record and the part of the sample may include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_31ebe8f1-1717-4e7a-9e65-761569bf9df8" id="sec.259-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the building of a publicly available database to facilitate petroleum exploration for the services of the State; and</txt></block></li><li guid="_13c57ede-b48c-4595-a68d-59d8b298512a" id="sec.259-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">GHG exploration.</txt></block></li></list></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_edd8297b-d498-4cd0-9a94-c579efddb2aa" id="ch.5-pt.4-div.3"><no>Division 3</no><heading guid="_e402e494-c713-4e70-8329-00ef7ab4148b" id="ch.5-pt.4-div.3-he">Releasing required information</heading><clause affected.by.uncommenced="0" guid="_9db8fa06-0627-4f68-b64d-71872c0e95f6" id="sec.260" provision.type="other" spent.amends="0"><no>260</no><heading guid="_4a11fe76-a475-493d-836e-8c22cd3432ca" id="sec.260-he">Meaning of <defterm guid="_4805c485-a3f6-402c-a5cc-7aac5ee72f9e" type="mention">required information</defterm></heading><block><txt break.before="1">The <defterm guid="_e84500a8-0c09-4c35-8e4d-7cd119e91c30" id="def.requiredinformation" type="definition">required information</defterm>, for a GHG authority, is information (in any form) about authorised activities carried out under the authority that the authority holder has given under this Act, including for example—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e00834e6-f3dc-40f8-895a-d561cff78a0f" id="sec.260-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a sample; and</txt></block></li><li guid="_3be663f7-f632-4756-ac2f-ddb562ac071b" id="sec.260-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">data and other matters mentioned in <intref check="valid" refid="sec.257" target.guid="_8ae05282-6abe-46c4-bab8-28c02ac6af0c">section 257</intref><intref check="valid" refid="sec.257-ssec.2" target.guid="_a9c6b860-1e54-454a-8cd1-083555a89a71">(2)</intref>.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_8bca74f7-fd26-47b9-88b5-9c5fdb266d5f" id="sec.261" provision.type="other" spent.amends="0"><no>261</no><heading guid="_c27a1223-23bc-4b7b-94d2-be4e7fd1267f" id="sec.261-he">Public release of required information</heading><subclause affected.by.uncommenced="0" guid="_fa604ef8-71b4-4022-a043-37d6a31b2321" id="sec.261-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The mere fact of the existence of a GHG authority is taken to be an authorisation from its holder to the chief executive to do the following, after the end of any confidentiality period prescribed under a regulation—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0e148778-427a-4fb2-9372-aacfa21c8c99" id="sec.261-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">publish in the way prescribed under a regulation required information for the GHG authority for public use;</txt></block></li><li guid="_4dd7daf8-193d-4d44-96f5-55a2b76a6af7" id="sec.261-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">on payment of a fee prescribed under a regulation, make it available to any person.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e21d7b86-6d21-419d-a5de-ba96d15b4fc6" id="sec.261-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Any confidentiality period prescribed under <intref check="valid" refid="sec.261-ssec.1" target.guid="_fa604ef8-71b4-4022-a043-37d6a31b2321">subsection (1)</intref> ceases if the information is about an authorised activity carried out only in an area that is no longer in the GHG authority’s area.</txt><note guid="_727ef03a-087a-4fd3-80e4-b416cea2177b" id="sec.261-ssec.2-note" type="example"><heading guid="_b9e6e83b-f1ba-4737-8cb7-98836b4aa978" id="sec.261-ssec.2-note-he">Example—</heading><block><txt break.before="1">The required information is a well completion report about a well drilled on particular land in the area of a GHG permit. <intref check="valid" refid="sec.261-ssec.1" target.guid="_fa604ef8-71b4-4022-a043-37d6a31b2321">Subsection (1)</intref> ceases to apply if all of that land is relinquished under the relinquishment condition.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_8dc43970-7db8-4a5e-b951-441e74706618" id="sec.261-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The authorisation is not affected by the ending of the GHG authority.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2a2fc0d5-93f1-47e3-98e6-03519bc21106" id="sec.262" provision.type="other" spent.amends="0"><no>262</no><heading guid="_b4682531-7b41-4f47-96d9-a9241de4883b" id="sec.262-he">Chief executive may use required information</heading><subclause affected.by.uncommenced="0" guid="_3e83802e-a123-4784-8857-770292ef856a" id="sec.262-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The mere fact of the existence of a GHG authority is taken to be an authorisation from its holder to the chief executive to use required information for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fdc7ec3e-6551-4c1c-b9e8-e58e20ffb03b" id="sec.262-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">purposes reasonably related to this Act that are required for the GHG authority; or</txt></block></li><li guid="_a7f9cfef-5af3-4b9a-829b-207d6fd24ae9" id="sec.262-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the services of the State.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_63a51a3d-58f0-4379-9e0f-617ea07b524b" id="sec.262-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The authorisation is not affected by the ending of the GHG authority.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_736da620-e2e1-4349-b7aa-eefb5514b8c2" id="ch.5-pt.5"><no>Part 5</no><heading guid="_d1a5ef50-6564-40f7-aa2e-cc36eb1a5c9f" id="ch.5-pt.5-he">General provisions for wells</heading><division affected.by.uncommenced="0" guid="_9e5cc30e-b4cc-4ede-a71a-8b8e92fbf34d" id="ch.5-pt.5-div.1"><no>Division 1</no><heading guid="_d0544c93-d250-46bd-a7f5-ea0eb43db5ef" id="ch.5-pt.5-div.1-he">Responsibility for wells</heading><clause affected.by.uncommenced="0" guid="_3a7496c4-00ac-4146-96dd-0e65ca1a1a1d" id="sec.263" provision.type="other" spent.amends="0"><no>263</no><heading guid="_25fd73f6-124d-4c60-8040-0f1807fe7947" id="sec.263-he">Former petroleum wells assumed by GHG tenure holder</heading><block><txt break.before="1">If, under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.75U" target.doc.id="act-1923-026" target.guid="_e2adb97a-3a24-43b4-94be-0de9efae841a" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act">section 75U</legref> or the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.292" target.doc.id="act-2004-025" target.guid="_21940938-f87d-4dd6-9453-0c2e8fab326c" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">section 292</legref>, a GHG tenure holder assumes responsibility for a well, this Act applies to the holder in relation to the well as if it were a GHG well.</txt></block></clause><clause affected.by.uncommenced="0" guid="_49fc55b1-72d9-4d0a-8d48-9b4378cf8f42" id="sec.264" provision.type="other" spent.amends="0"><no>264</no><heading guid="_3390882c-d9a4-4b9f-9c01-05c79823062a" id="sec.264-he">Requirements for drilling GHG well</heading><block><txt break.before="1">A person drilling a GHG well must comply with—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_55278962-622a-46cf-a399-a50b630d345b" id="sec.264-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">any requirements prescribed under a regulation for the drilling of the GHG well; and</txt></block></li><li guid="_8d0681c6-b59b-42c3-a3b0-631ac2ed8396" id="sec.264-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any relevant requirements about construction and drilling standards for water bore drilling activities under the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref>.</txt></block></li></list></block><penalty guid="_a6d23810-90d0-40de-9383-e87fb91ffc1e" id="sec.264-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty><note guid="_caa9a7f8-3c0a-4558-bcec-99fd6a50578c" id="sec.264-note" type="example"><heading guid="_38e5f9df-e01a-4e41-b313-fb7179d8c131" id="sec.264-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.393A" target.guid="_fc002d70-b11f-4c2c-bb3c-803ff65a1948">section 393A</intref>, to have also committed the offence.</txt></block></note></clause></division><division affected.by.uncommenced="0" guid="_b7c8dcd9-5cdd-4ead-b3f7-603e2cd252b8" id="ch.5-pt.5-div.2"><no>Division 2</no><heading guid="_5a328fd3-e44a-4526-b608-72be5aabd642" id="ch.5-pt.5-div.2-he">Decommissioning of wells</heading><clause affected.by.uncommenced="0" guid="_182fec74-f656-4fe9-8258-5ee0d60caa92" id="sec.265" provision.type="other" spent.amends="0"><no>265</no><heading guid="_71c9135e-6cef-4164-93f0-5ca0f0e676d5" id="sec.265-he">Application of <intref check="valid" refid="ch.5-pt.5-div.2" target.guid="_b7c8dcd9-5cdd-4ead-b3f7-603e2cd252b8">div 2</intref></heading><block><txt break.before="1">This division applies to the following wells in the area of a GHG tenure—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b043bd24-94a8-4dc8-a91a-b131179b5235" id="sec.265-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a GHG well drilled by or for the GHG tenure holder;</txt></block></li><li guid="_42cec4e0-92b2-413f-b920-4616f153968a" id="sec.265-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a well that is or has been a petroleum well for which the holder has, under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.75U" target.doc.id="act-1923-026" target.guid="_e2adb97a-3a24-43b4-94be-0de9efae841a" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act">section 75U</legref> or the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.292" target.doc.id="act-2004-025" target.guid="_21940938-f87d-4dd6-9453-0c2e8fab326c" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">section 292</legref>, assumed responsibility.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_5021fa8e-be39-43f1-8b04-143277cd5c44" id="sec.266" provision.type="other" spent.amends="0"><no>266</no><heading guid="_570f2013-e172-46f9-bb6b-f6b41c1682db" id="sec.266-he">Restriction on decommissioning well</heading><block><txt break.before="1">It is a condition of the GHG tenure that the GHG tenure holder may decommission the well only if the GHG storage reservoir to which the well relates has no available storage capacity for any further injection for GHG storage.</txt></block></clause><clause affected.by.uncommenced="0" guid="_0f9dc122-df5d-4fa0-90ae-718fa0e66f51" id="sec.267" provision.type="other" spent.amends="0"><no>267</no><heading guid="_3a0c6bd1-8727-4604-8c38-26e9a463691d" id="sec.267-he">Obligation to decommission</heading><subclause affected.by.uncommenced="0" guid="_c90e6812-3082-49f1-9011-7b95c864b6dd" id="sec.267-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.266" target.guid="_5021fa8e-be39-43f1-8b04-143277cd5c44">section 266</intref>, the GHG tenure holder must ensure the well is decommissioned from use under this Act before—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_128756a1-9834-4a61-8f1a-a7bc3b04058f" id="sec.267-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for a GHG lease—the GHG storage reservoir to which the well relates has no available storage capacity for any further injection for GHG storage; or</txt></block></li><li guid="_2146d29e-5f41-4660-a998-473f6461d1dc" id="sec.267-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for a GHG permit—the permit ends or the land on which the well is located ceases to be in the permit’s area.</txt></block></li></list></block><penalty guid="_d065b034-0e8e-4713-8636-9aa2c9fa3e48" id="sec.267-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_afb476de-491a-4697-b371-cfe52d959612" id="sec.267-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.267-ssec.1" target.guid="_c90e6812-3082-49f1-9011-7b95c864b6dd">subsection (1)</intref> does not apply for land that, under <intref check="valid" refid="sec.48" target.guid="_5ddb6410-88fa-4e9c-909a-1535eab66cf5">section 48</intref><intref check="valid" refid="sec.48-ssec.1" target.guid="_78384f5c-c8e0-4744-ab61-e4802a0fe3eb">(1)</intref>, ceases to be in the area of a GHG permit.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_339be674-cc04-4d54-a153-8f7d4d437621" id="sec.267-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For <intref check="valid" refid="sec.267-ssec.1" target.guid="_c90e6812-3082-49f1-9011-7b95c864b6dd">subsection (1)</intref>, the well is decommissioned from use under this Act only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b14fffcd-4390-4b8e-af2a-9dc209975af0" id="sec.267-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">it has been plugged and abandoned in the way prescribed under a regulation; and</txt></block></li><li guid="_02ee1553-a806-464c-95de-7bf3969c743d" id="sec.267-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any relevant requirements under the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref> for the decommissioning of water bores have been complied with; and</txt></block></li><li guid="_69ad0a23-549a-4de8-bf70-4f67b160f03f" id="sec.267-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the GHG tenure holder has given the Water Act Minister a notice in the approved form about the decommissioning.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b431ef28-eb1a-4405-b8b3-ab22b81ccab2" id="sec.268" provision.type="other" spent.amends="0"><no>268</no><heading guid="_696fe31a-d69f-42b5-8cde-d6e296aebabb" id="sec.268-he">Right of entry to facilitate decommissioning for GHG permit</heading><subclause affected.by.uncommenced="0" guid="_1482f82f-9564-4030-b397-da67056ba9d2" id="sec.268-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2d6b8b18-fe14-47ef-9b79-ff2e0997d19a" id="sec.268-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the GHG tenure is a GHG permit; and</txt></block></li><li guid="_1cdb4097-0f81-425c-923b-43a0fc68fdf4" id="sec.268-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the GHG permit has ended or the land on which the well is located is no longer in the GHG tenure’s area; and</txt></block></li><li guid="_6c14b1cb-5b93-455b-99dd-237ebf79d8ad" id="sec.268-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the GHG permit holder or former holder has not carried out decommissioning as required under <intref check="valid" refid="sec.267" target.guid="_0f9dc122-df5d-4fa0-90ae-718fa0e66f51">section 267</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_59ba2943-b082-4561-8dae-2335704a2685" id="sec.268-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The holder or former holder may enter the following land to carry out the decommissioning—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e9e22f9b-e6f5-4428-8dee-723f4234aa27" id="sec.268-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">land (the <defterm guid="_6e44a2e9-8144-4eca-abbb-1981d0849caf" id="sec.268-ssec.2-def.primaryland" type="definition">primary land</defterm>) on which the decommissioning must be or was required to be carried out;</txt></block></li><li guid="_7a063132-371d-44b1-a48b-942b512543b4" id="sec.268-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any other land (the <defterm guid="_a656c87c-8969-4f81-af7a-c78e9937a7f9" id="sec.268-ssec.2-def.accessland" type="definition">access land</defterm>) it is reasonably necessary to cross for access to the primary land.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2af03a7d-ed28-442e-9116-ffdf710509ae" id="sec.268-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-2014-047" target.guid="_78e7ee55-dcff-4087-b0b9-13497e839af3" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">chapter 3</legref>, <legref check="valid" jurisd="QLD" refid="ch.3-pt.2" target.doc.id="act-2014-047" target.guid="_adcc85c6-c389-49c8-b998-858dca31ac1f" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">parts 2</legref> and <legref check="valid" jurisd="QLD" refid="ch.3-pt.3" target.doc.id="act-2014-047" target.guid="_bdb2d16b-be5f-49e4-add9-ce41b99ca361" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">3</legref> and <legref check="valid" jurisd="QLD" refid="ch.3-pt.7" target.doc.id="act-2014-047" target.guid="_9e5d29e3-f634-4040-a21c-6073a407f144" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">part 7</legref> (other than <legref check="invalid" jurisd="QLD" type="act">division 3</legref>) applies to the holder or former holder in the following way—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_78252276-572c-4903-8769-f972eb6ec692" id="sec.268-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the GHG permit has ended, as if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_608922ab-4b5f-4d5a-9b55-fc982eded4e4" id="sec.268-ssec.3-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">it were still in force; and</txt></block></li><li guid="_306bdbd5-dea8-46ae-a98a-fcdf7657eee8" id="sec.268-ssec.3-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the former holder were still its holder;</txt></block></li></list></block></li><li guid="_18db74bd-2364-4432-bad3-c043adf12ef7" id="sec.268-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">as if the primary land and access land is in the GHG permit’s area;</txt></block></li><li guid="_3354e767-a7db-49bf-a40d-5ef8f8ce8783" id="sec.268-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">as if the decommissioning is an authorised activity for the GHG tenure.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3c9ceef4-83ab-42cf-9742-82906ed7c60e" id="sec.269" provision.type="other" spent.amends="0"><no>269</no><heading guid="_b6eeeae8-785d-40ba-bc27-f4afecc40d62" id="sec.269-he">Responsibility for well after decommissioning</heading><subclause affected.by.uncommenced="0" guid="_251db343-1dcb-4787-81b1-cefe2e0398c1" id="sec.269-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the GHG tenure holder has decommissioned a well under <intref check="valid" refid="sec.267" target.guid="_0f9dc122-df5d-4fa0-90ae-718fa0e66f51">section 267</intref>.</txt><note guid="_9c2ee078-442d-431d-b53a-82093f1a8cc4" id="sec.269-ssec.1-note" type="example"><heading guid="_9764a2ff-7636-4e35-b91e-6e59a14237e1" id="sec.269-ssec.1-note-he">Note—</heading><block><txt break.before="1">For ownership before decommissioning, see <intref check="valid" refid="sec.327" target.guid="_0f9cf5ac-51b9-43d6-8f03-790d276951a2">section 327</intref> (Ownership of equipment and improvements).</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_4094a51b-9115-4cc5-8783-96b5170a4784" id="sec.269-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite the decommissioning, the holder continues to be responsible under this Act for the well until the earlier of the following times (the <defterm guid="_1167f67e-ece5-40a0-a976-2a33cd83cf1e" id="sec.269-def.relevanttime" type="definition">relevant time</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7f82dfc8-4caa-4784-a123-bd998b3d7faa" id="sec.269-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">when the GHG tenure ends;</txt></block></li><li guid="_e807d1c5-1650-4ff2-9332-7abe4685b55d" id="sec.269-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">when the land on which the well is located ceased to be in the GHG tenure’s area.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7ced8660-d1ab-4d1a-a317-92e6830eddb0" id="sec.269-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">At the relevant time the well is taken to have been transferred to the State.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_45dab233-f8b5-4319-9b56-3f0053e602ef" id="sec.269-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0"><intref check="valid" refid="sec.269-ssec.3" target.guid="_7ced8660-d1ab-4d1a-a317-92e6830eddb0">Subsection (3)</intref> applies despite—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2b908a32-7936-4506-9dc8-ecc13097788b" id="sec.269-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the well being on or part of land owned by someone else; or</txt></block></li><li guid="_56416c74-dc01-4e28-a937-7fd5ef7ce62f" id="sec.269-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the sale or other disposal of the land.</txt></block></li></list></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_8352f6c6-2394-4511-8804-dbb4959e798a" id="ch.5-pt.6"><no>Part 6</no><heading guid="_9aefe1dd-0f53-4d9f-a91d-76101eecb38a" id="ch.5-pt.6-he">Security</heading><clause affected.by.uncommenced="0" guid="_11148f4b-4c7a-4e6e-b672-65fe567c96b1" id="sec.270" provision.type="other" spent.amends="0"><no>270</no><heading guid="_9cebaed6-ca35-485f-ae97-8619514f9d85" id="sec.270-he">Operation and purpose of <intref check="valid" refid="ch.5-pt.6" target.guid="_8352f6c6-2394-4511-8804-dbb4959e798a">pt 6</intref></heading><subclause affected.by.uncommenced="0" guid="_359cda82-49fa-4227-9c99-2f2debf3e6e1" id="sec.270-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This part empowers the Minister to require, from time to time, the holder of a GHG authority or a person who has applied for a GHG authority to give the State security for the authority or proposed authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6b1274a3-77f7-4a0b-9e9c-1a7f478b0f78" id="sec.270-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The security may be used to pay—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5a6117a2-77e3-4d18-a0d1-7e8857139401" id="sec.270-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">any liability under this Act that the State incurs because of an act or omission of the holder; and</txt></block></li><li guid="_c62007ba-455a-4424-ae4a-580d4898b98a" id="sec.270-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any unpaid annual rent payable by the holder to the State; and</txt></block></li><li guid="_a1c598f6-10ed-4912-a84d-29a3f4f846db" id="sec.270-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">other unpaid amounts payable under this Act by the holder to the State, including for example, any of the following payable by the holder to the State—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_99a623e4-0d1d-4fb3-901f-7de6b592b2b5" id="sec.270-ssec.2-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">unpaid civil penalty;</txt></block></li><li guid="_29cee193-7543-4545-8773-28031d96782e" id="sec.270-ssec.2-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">unpaid interest on unpaid annual rent;</txt></block></li><li guid="_10836073-6668-429c-ac23-8cd941a8ff61" id="sec.270-ssec.2-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">any debt payable by the holder under <intref check="valid" refid="sec.371" target.guid="_7c597732-f910-46aa-a0ad-d42518a37ee7">section 371</intref>; and</txt></block></li></list></block></li><li guid="_712a1200-67b2-4695-990d-989ffc56b4a2" id="sec.270-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">any compensation the State must pay under <intref check="valid" refid="sec.360" target.guid="_f04b5efd-22c6-4b3b-b774-931e798ce2db">section 360</intref> because of the exercise or purported exercise of a remedial power under <intref check="valid" refid="sec.356" target.guid="_a963356b-31d0-46d1-ad14-0cf2ffeb6138">section 356</intref> for the GHG authority, whether or not the authority has ended.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_189844e5-1f2b-472b-a0aa-286d65029d9a" id="sec.271" provision.type="other" spent.amends="0"><no>271</no><heading guid="_1cbe3d06-2ff8-4856-9075-f45583222a15" id="sec.271-he">Power to require security for GHG authority</heading><subclause affected.by.uncommenced="0" guid="_9477d506-97d8-4017-ae80-7b7531a035be" id="sec.271-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may require the holder of a GHG authority or a person who has applied for a GHG authority to give the State security for the authority, or proposed authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_95d7e411-53de-430e-878e-ccfc536db2b2" id="sec.271-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The security must be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c40e419b-b419-4a28-a172-ce6000c53102" id="sec.271-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in the form prescribed under a regulation; and</txt></block></li><li guid="_7310ed8f-8b1b-4052-ad5e-decfbe97819b" id="sec.271-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">of at least the amount prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2ea5e835-19e6-4713-a30b-15715d300dc8" id="sec.271-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The requirement may be made at any time.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d36a2b6c-91bb-408c-8247-8ae7164a176e" id="sec.271-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, the requirement does not take effect until the holder or applicant is given—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f67a4d12-27f5-41e1-b3b5-a4197c2cfc8c" id="sec.271-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for a requirement to give security in the form and amount prescribed under <intref check="valid" refid="sec.271-ssec.2" target.guid="_95d7e411-53de-430e-878e-ccfc536db2b2">subsection (2)</intref>—notice of the requirement; or</txt></block></li><li guid="_53b40629-431a-4253-a806-cb157494dd44" id="sec.271-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—an information notice about the decision to make the requirement.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d6d41ba6-000d-42e2-b4a3-e86dee3f712a" id="sec.272" provision.type="other" spent.amends="0"><no>272</no><heading guid="_5cec4e9c-c455-4002-9b06-d88dc2fac3ab" id="sec.272-he">Minister’s power to require additional security</heading><subclause affected.by.uncommenced="0" guid="_c3433cc5-117f-4566-89a1-690754b0ad7a" id="sec.272-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may at any time require a GHG authority holder to increase the amount of security given for the authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_47099523-8ea8-4065-9182-7cfd432dd5ab" id="sec.272-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d8666c69-9158-4be7-b27d-461ecc107865" id="sec.272-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if, because of an increase in the prescribed amount under <intref check="valid" refid="sec.271" target.guid="_189844e5-1f2b-472b-a0aa-286d65029d9a">section 271</intref><intref check="valid" refid="sec.271-ssec.2" target.guid="_95d7e411-53de-430e-878e-ccfc536db2b2">(2)</intref>, the requirement is to increase the total security required to no more than the increased prescribed amount—the requirement must be made by notice to the holder; or</txt></block></li><li guid="_2c1d5155-2df0-44a4-80c0-fb5a8e4475e9" id="sec.272-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the requirement is to increase the total security required to more than the prescribed amount under <intref check="valid" refid="sec.271" target.guid="_189844e5-1f2b-472b-a0aa-286d65029d9a">section 271</intref><intref check="valid" refid="sec.271-ssec.2" target.guid="_95d7e411-53de-430e-878e-ccfc536db2b2">(2)</intref> when the requirement is made—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4961e4b7-982a-457e-b63f-9e842add28a3" id="sec.272-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0"><intref check="valid" refid="sec.272-ssec.3" target.guid="_5a36b226-39f8-4183-ae4e-bbc6f3559a56">subsections (3)</intref> to <intref check="valid" refid="sec.272-ssec.6" target.guid="_501f03aa-a691-4ceb-9b00-b9ed4de45bdb">(6)</intref> must be complied with before making the requirement; and</txt></block></li><li guid="_0f757b31-8f3c-4c0e-8bee-dfeb97699c53" id="sec.272-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the requirement does not take effect until the holder is given an information notice about the decision to make the requirement.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5a36b226-39f8-4183-ae4e-bbc6f3559a56" id="sec.272-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister must give the holder notice—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0623a890-4db1-4864-94d5-bda61dc3e091" id="sec.272-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">stating the proposed increased amount of the security for the GHG authority; and</txt></block></li><li guid="_f457a97b-e47b-4b0b-8669-bc8f32a0371c" id="sec.272-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">inviting the holder to within a stated reasonable period make submissions to the Minister about the proposed increased amount.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f71bf5df-a069-4204-8c45-b59e1fe77f60" id="sec.272-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The stated period must end at least 20 business days after the holder is given the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a483d712-c27d-45d1-8f49-dd177443fc57" id="sec.272-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The Minister must consider any submissions made by the holder within the stated period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_501f03aa-a691-4ceb-9b00-b9ed4de45bdb" id="sec.272-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_0f9a220a-d6f1-49c1-b480-3a6a775da683" id="sec.272-ssec.6-def.security_"><txt break.before="1"><defterm guid="_d02295c8-e804-4227-94f9-a6713b33f73e" id="sec.272-ssec.6-def.security" type="definition">security </defterm>given includes security given or increased because of a requirement under <intref check="valid" refid="sec.272-ssec.1" target.guid="_c3433cc5-117f-4566-89a1-690754b0ad7a">subsection (1)</intref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2e2d74db-0d2d-423f-9297-7b5d25e14b41" id="sec.273" provision.type="other" spent.amends="0"><no>273</no><heading guid="_b5636636-5feb-4bf0-aa3c-e30e0136b363" id="sec.273-he">Interest on security</heading><block><txt break.before="1">The State may keep any interest that accrues on security given under this part for a GHG authority.</txt></block></clause><clause affected.by.uncommenced="0" guid="_560a1804-7ffe-4777-b61e-ff8cfa392b89" id="sec.274" provision.type="other" spent.amends="0"><no>274</no><heading guid="_ee1aa237-1a57-469b-b5d9-597621677522" id="sec.274-he">Power to use security</heading><block><txt break.before="1">The State may use security given under this part for a GHG authority and any interest that accrues on the security to make a payment mentioned in <intref check="valid" refid="sec.270" target.guid="_11148f4b-4c7a-4e6e-b672-65fe567c96b1">section 270</intref><intref check="valid" refid="sec.270-ssec.2" target.guid="_6b1274a3-77f7-4a0b-9e9c-1a7f478b0f78">(2)</intref> concerning the authority.</txt></block></clause><clause affected.by.uncommenced="0" guid="_96a913bd-20c6-4f3a-9b1d-93537371d24b" id="sec.275" provision.type="other" spent.amends="0"><no>275</no><heading guid="_d43613ad-ae2a-4ebc-b3d2-65904e146ce2" id="sec.275-he">Replenishment of security</heading><subclause affected.by.uncommenced="0" guid="_c0daf8a5-4b4c-4c2d-9620-04a513c28c1e" id="sec.275-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d641e8d3-e4dd-49ac-9119-77448eb342d0" id="sec.275-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">under <intref check="valid" refid="sec.274" target.guid="_560a1804-7ffe-4777-b61e-ff8cfa392b89">section 274</intref>, all or part of the security for a GHG authority has been used; and</txt></block></li><li guid="_2f617893-2f9c-4368-a39b-720faf06e713" id="sec.275-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the GHG authority is still in force.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c2783689-edbb-4b27-a51f-0e3defde3b1b" id="sec.275-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister must give the GHG authority holder a notice—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e3cbdf12-59de-439e-96e6-4be2972f8569" id="sec.275-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">stating how much of the security has been used; and</txt></block></li><li guid="_deba26c0-a3c4-4bff-bbaa-aa216e4bddda" id="sec.275-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">directing the holder to within 30 days after the giving of the notice replenish the security for the GHG authority up to the higher of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_332a0e66-f189-496d-9e30-eb4fc88bb3e4" id="sec.275-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the amount prescribed under a regulation;</txt></block></li><li guid="_f5423868-74fc-43cf-8ced-a263213c156a" id="sec.275-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the notice states that under <intref check="valid" refid="sec.271" target.guid="_189844e5-1f2b-472b-a0aa-286d65029d9a">section 271</intref>, another amount is required—the other amount.</txt></block></li></list></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_80a85656-086f-4495-be8b-0ab697739ac9" id="sec.276" provision.type="other" spent.amends="0"><no>276</no><heading guid="_e5786a2a-6b90-41e8-96ef-641011ff994d" id="sec.276-he">Security not affected by change in authority holder</heading><subclause affected.by.uncommenced="0" guid="_716cea80-4ac1-4e75-880c-f02336244030" id="sec.276-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if security for a GHG authority has been given under this part for the authority and its holder changes.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_034f5658-6779-4203-bd35-683b891307be" id="sec.276-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite the change, the security and any interest that accrues on it continues in force for the benefit of the State and may be used under <intref check="valid" refid="sec.274" target.guid="_560a1804-7ffe-4777-b61e-ff8cfa392b89">section 274</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4533aa59-639d-4a59-b7e1-6bf5daa20f5e" id="sec.276-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the security is in the form of money, until the security is replaced or refunded it continues in force for the holder from time to time of the GHG authority.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7c5e11ec-d785-47cc-935a-5faa9bcfd252" id="sec.277" provision.type="other" spent.amends="0"><no>277</no><heading guid="_e3a62a03-845f-4052-af6a-b690de5d55fc" id="sec.277-he">Retention of security after GHG authority ends</heading><subclause affected.by.uncommenced="0" guid="_d54f9d3d-fdd1-4d7d-8c6c-363a3f283da7" id="sec.277-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Security or part of security given for a GHG authority may be kept for 1 year after the authority has ended.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1e8145a0-c318-44a2-b632-c11f1d5345f2" id="sec.277-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Also, if a claim made for the use of the security has not been assessed, an appropriate amount of the security to meet the claim may be kept until the claim has been assessed.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_d9190cfa-aa4f-4687-9d86-4e920415a78f" id="ch.5-pt.11"><no>Part 11</no><heading guid="_f23be2d7-14f3-4a88-ab8b-6b2741831aa9" id="ch.5-pt.11-he">Ownership of equipment and improvements</heading><clause affected.by.uncommenced="0" guid="_87952200-4029-41d7-9276-dd719aece482" id="sec.326" provision.type="other" spent.amends="0"><no>326</no><heading guid="_7c9e6fca-fb4f-435b-8f05-c6cd65879a28" id="sec.326-he">Application of <intref check="valid" refid="ch.5-pt.11" target.guid="_d9190cfa-aa4f-4687-9d86-4e920415a78f">pt 11</intref></heading><subclause affected.by.uncommenced="0" guid="_0faa7f22-227b-407f-84ef-d7cb46f77423" id="sec.326-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This part applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_52268478-101a-4952-89aa-5f3782a2a002" id="sec.326-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">equipment or improvements are taken, constructed or placed on land in the area of a GHG authority; and</txt></block></li><li guid="_f7307ca7-3717-4eae-836b-e4fea5f18a1e" id="sec.326-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the equipment or improvements were taken, constructed or placed on the land for use for an authorised activity for the GHG authority; and</txt></block></li><li guid="_76a41411-f9b0-4919-9151-f774937b5ddf" id="sec.326-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the GHG authority continues in force.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_eab58161-23d1-4d3d-8bd4-db47a2991099" id="sec.326-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, this part—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_57ad4294-cff8-4f4c-92f3-06fb57cc5b92" id="sec.326-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">does not apply for a GHG stream pipeline; and</txt></block></li><li guid="_3c407665-aa3d-4aa1-bf7b-023c995b2563" id="sec.326-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is subject to <intref check="valid" refid="ch.5-pt.15" target.guid="_e7a57c0b-ba21-4f9c-aa1a-c2d293ff97fe">part 15</intref>.</txt></block></li></list><note guid="_421b8607-432c-4159-876f-26569b47ab19" id="sec.326-ssec.2-note" type="example"><heading guid="_0ca28db5-0b62-430e-870b-d668b8c21155" id="sec.326-ssec.2-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_36f94755-847a-4120-b932-21150a60beaf" id="sec.326-ssec.2-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">For pipelines, see <intref check="valid" refid="sec.250" target.guid="_da37b1ef-16e2-44ef-a499-7e148e9cf5ea">sections 250</intref> (General provision about ownership while tenure is in force for pipeline) and <intref check="valid" refid="sec.252" target.guid="_e552a73b-b0b7-4f27-8241-11a39215c7a3">252</intref> (Obligation to decommission pipelines on cessation or reduction of tenure).</txt></block></li><li guid="_5a98c773-471d-4506-8b11-50081f1061e9" id="sec.326-ssec.2-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0"><intref check="valid" refid="ch.5-pt.15" target.guid="_e7a57c0b-ba21-4f9c-aa1a-c2d293ff97fe">Part 15</intref> (Enforcement of end of authority and area reduction obligations).</txt></block></li></list></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_f00878ab-7c81-4888-8f8f-2a3f1edec9ff" id="sec.326-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_9393e143-a941-43e2-a1e5-9406d68e6483" id="sec.326-ssec.3-def.equipment_"><txt break.before="1"><defterm guid="_0e087317-bacd-4467-9674-13597620888b" id="sec.326-ssec.3-def.equipment" type="definition">equipment</defterm> includes machinery and plant.</txt></definition><definition affected.by.uncommenced="0" guid="_ef40cb2b-666d-442a-8fdc-b1b353eb5cf0" id="sec.326-ssec.3-def.improvements_"><txt break.before="1"><defterm guid="_3842ac27-e378-4ee6-a10b-887bfa6fb1e6" id="sec.326-ssec.3-def.improvements" type="definition">improvements</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_38b8fab2-976e-4c45-aea7-1df324b8a55d" id="sec.326-ssec.3-def.improvements-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">does not include a GHG well; but</txt></block></li><li guid="_61a97a6c-df23-476c-8eab-ff315941bde1" id="sec.326-ssec.3-def.improvements-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">does include any works constructed in connection with a GHG well.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0f9cf5ac-51b9-43d6-8f03-790d276951a2" id="sec.327" provision.type="other" spent.amends="0"><no>327</no><heading guid="_61c9be52-e36d-46c0-8341-a686a5941f45" id="sec.327-he">Ownership of equipment and improvements</heading><subclause affected.by.uncommenced="0" guid="_12d05831-20d7-4f92-94d3-651bdf731af3" id="sec.327-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">While the equipment or improvements are on the land they remain the property of the person who owned them immediately before they were taken, constructed or placed on the land, unless that person otherwise agrees.</txt><note guid="_79ff7a23-ed43-4c2e-a8ee-49c3dd6c88af" id="sec.327-ssec.1-note" type="example"><heading guid="_2db324e2-9f77-404b-8568-f2c883c8ed46" id="sec.327-ssec.1-note-he">Note—</heading><block><txt break.before="1">See however <intref check="valid" refid="sec.334" target.guid="_879991b1-8374-4837-a4ac-3519ef239a1e">section 334</intref> (Obligation to remove equipment and improvements).</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_1ca35a60-f7d5-4bf8-a6b9-9eab0b87de2a" id="sec.327-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, for a GHG well <intref check="valid" refid="sec.327-ssec.1" target.guid="_12d05831-20d7-4f92-94d3-651bdf731af3">subsection (1)</intref> is subject to <intref check="valid" refid="ch.5-pt.5" target.guid="_736da620-e2e1-4349-b7aa-eefb5514b8c2">part 5</intref>, <intref check="valid" refid="ch.5-pt.5-div.2" target.guid="_b7c8dcd9-5cdd-4ead-b3f7-603e2cd252b8">division 2</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d2c49a61-e594-4735-9b05-cdd86ab16b02" id="sec.327-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0"><intref check="valid" refid="sec.327-ssec.1" target.guid="_12d05831-20d7-4f92-94d3-651bdf731af3">Subsection (1)</intref> applies despite—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a033e15b-f5a9-4a8d-9c51-e40eb8fed0a5" id="sec.327-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the plant or equipment having become part of the land; or</txt></block></li><li guid="_06af923c-3926-4629-86fb-26b3dd179416" id="sec.327-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the sale or other disposal of the land.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_dfdbe61d-6070-4893-b736-cebad828a1e5" id="sec.327-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The equipment or improvements can not be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_962d8c79-8b5c-4353-9914-fbe596d45d56" id="sec.327-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">levied or seized in execution; or</txt></block></li><li guid="_7c1a44da-d502-4675-9dd1-25b6d3c666f3" id="sec.327-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">sold in exercise of a power of sale or otherwise disposed of by a process under a law of a State taken against the holder or the owner of the land.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_865ceb26-54af-448b-8318-c4f7a3a35e9d" id="sec.327-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">This section applies despite—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7d8cd190-e074-417a-94c3-fc05d84407eb" id="sec.327-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an Act or law of a State; or</txt></block></li><li guid="_05bcad6a-3009-4450-9408-ac7ea235dba9" id="sec.327-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a contract, covenant or claim of right under a law of a State.</txt></block></li></list></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_1522b152-04be-4326-95f6-52b27402695b" id="ch.5-pt.12"><no>Part 12</no><heading guid="_98deedaf-6cf6-4c95-8077-43a023a7c933" id="ch.5-pt.12-he">General provisions for conditions and authorised activities</heading><division affected.by.uncommenced="0" guid="_8403f90a-9f67-411d-a6f1-cbec40c0cf68" id="ch.5-pt.12-div.1"><no>Division 1</no><heading guid="_284751f2-7c88-4abc-b372-1baeef33592e" id="ch.5-pt.12-div.1-he">Other mandatory conditions for all GHG authorities</heading><clause affected.by.uncommenced="0" guid="_e7d75234-334e-4bad-b669-3298e8fbde07" id="sec.328" provision.type="other" spent.amends="0"><no>328</no><heading guid="_8399012d-b5b0-4e65-b80c-e2d84642cdc3" id="sec.328-he">Operation of <intref check="valid" refid="ch.5-pt.12-div.1" target.guid="_8403f90a-9f67-411d-a6f1-cbec40c0cf68">div 1</intref></heading><block><txt break.before="1">This division provides for general mandatory conditions for all GHG authorities.</txt><note guid="_86c98915-c6a8-41a1-9fe9-2a33845a3f30" id="sec.328-note" type="example"><heading guid="_0fb0a9f3-6342-4f58-bef6-e188c4ddd02a" id="sec.328-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_97eb4578-1b2f-42b9-a276-2cc30985333c" id="sec.328-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">The following provisions also impose mandatory conditions on all GHG authorities—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1c563c78-ed8c-4ab8-8b42-b26a19413b2c" id="sec.328-note-para1.1-para2" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="ch.2" target.guid="_60f42d8e-8fdb-4c76-a1e6-d0c7ad27b9d4">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.1" target.guid="_268c7353-63e2-4481-af6a-c5e5ac457b76">parts 1</intref> and <intref check="valid" refid="ch.2-pt.5" target.guid="_07c486d0-f89b-471e-a460-688e77359ec5">5</intref></txt></block></li><li guid="_7bb013d0-4353-4565-90be-0b8844d54242" id="sec.328-note-para1.1-para2-oc.2" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="ch.3" target.guid="_4c6bae05-4d64-4dbf-a4f3-a2736db63437">chapter 3</intref>, <intref check="valid" refid="ch.3-pt.1" target.guid="_8bc97f5c-bb0e-42b6-adf5-161382950c8e">parts 1</intref> and <intref check="valid" refid="ch.3-pt.6" target.guid="_832c1f2e-bfaf-4570-a60e-6c79ae0669f6">6</intref></txt></block></li><li guid="_bf76ccc6-b022-4124-99fb-2a402cff731a" id="sec.328-note-para1.1-para2-oc.3" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="ch.4" target.guid="_faefc638-342e-43b0-a5ed-6ae7a9f9a690">chapter 4</intref>.</txt></block></li></list></block></li><li guid="_02464137-e60e-48f6-95ac-3367f373f1c5" id="sec.328-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">For what is a mandatory condition, see <intref check="valid" refid="sec.20" target.guid="_6a183a3b-a88c-4f09-9eea-0fc8117ffb80">section 20</intref><intref check="valid" refid="sec.20-ssec.2" target.guid="_88215ea2-2785-4d6a-9e25-a4f02d4849d9">(2)</intref>.</txt></block></li></list></block></note></block></clause><clause affected.by.uncommenced="0" guid="_34367b1e-8b7d-4a93-bff5-510a01235a08" id="sec.329" provision.type="other" spent.amends="0"><no>329</no><heading guid="_a3c88cd3-c462-478f-8991-4b9b91a1e31b" id="sec.329-he">Compliance with land access code</heading><block><txt break.before="1">A GHG authority holder must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e54ff4f4-3b07-4f4c-8ae1-42fe1f64e05e" id="sec.329-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">comply with the mandatory provisions of the land access code to the extent it applies to the holder; and</txt></block></li><li guid="_98457bd1-b51d-483f-b684-aed1dd4e9295" id="sec.329-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">ensure any other person carrying out an authorised activity for the GHG authority complies with the mandatory provisions of the land access code.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_23af4b49-d71a-4b15-b5f7-08207a109272" id="sec.331" provision.type="other" spent.amends="0"><no>331</no><heading guid="_85164e09-30a0-49d4-aaab-7798f5ef6be3" id="sec.331-he">Obligation to comply with Act and prescribed standards</heading><subclause affected.by.uncommenced="0" guid="_46d72375-1779-4461-9fa2-0d559fd21c55" id="sec.331-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The holder of a GHG authority must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_81076d6d-2192-4f61-b0de-4960ae09d277" id="sec.331-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">comply with this Act; and</txt></block></li><li guid="_11824a53-310c-4b57-b5d9-de3db67164fe" id="sec.331-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">in carrying out an authorised activity for the GHG authority, comply with—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bec4c155-4eda-4644-9c6d-bbed99cbca9c" id="sec.331-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">any standard that the GHG authority provides for the activity; and</txt></block></li><li guid="_f3085e8e-3d2d-4aee-a8fe-139834f49795" id="sec.331-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">to the extent that the GHG authority does not provide a standard for the activity—any standard prescribed under a regulation for carrying out the activity.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_dc80ce86-cb8c-4373-ad1d-e7875ff34452" id="sec.331-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_0ddf55b7-06ec-4e5a-9ca2-d1bf2a46d4e0" id="sec.331-ssec.2-def.standard_"><txt break.before="1"><defterm guid="_aaaa3eec-5c93-4d89-b9a4-6ddd675afe08" id="sec.331-ssec.2-def.standard" type="definition">standard</defterm> includes an Australian Standard, an international standard or a code or protocol.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b5bd181b-1d4b-4c36-969b-3c0e9aaa5fc4" id="sec.332" provision.type="other" spent.amends="0"><no>332</no><heading guid="_ad3abd23-bd74-4e7d-b279-a2f74a78c5cc" id="sec.332-he">Obligation to survey if Minister requires</heading><subclause affected.by.uncommenced="0" guid="_b38daaac-6297-4dee-ae60-a3e717eb658f" id="sec.332-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may by notice to the holder of a GHG authority require the holder to survey or resurvey its area within a stated reasonable period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_11db79c9-cf28-4b34-b038-c2e4a2cb9518" id="sec.332-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The holder must cause the survey or resurvey to be carried out by a person registered as a cadastral surveyor under the <legref check="valid" jurisd="QLD" target.doc.id="act-2003-070" target.version.series="58bf4472-9a2d-4809-9f04-c4ff625373da" type="act"><name emphasis="yes">Surveyors Act 2003</name></legref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1a23ebe8-1b2e-4795-8813-84aade10dd87" id="sec.332-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The holder must pay any costs incurred in complying with the notice.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_78ee964b-cbd0-4ae4-8425-2ddf86153c05" id="sec.333" provision.type="other" spent.amends="0"><no>333</no><heading guid="_63a2d22e-67aa-4c60-bf69-5e1acad3696e" id="sec.333-he">Notice of petroleum discovery</heading><subclause affected.by.uncommenced="0" guid="_eb6aa46d-b7a7-40ed-8be2-055262bf79dd" id="sec.333-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if because of the carrying out an authorised activity for a GHG authority, its holder discovers petroleum.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9b9ee839-0146-44a1-8fd7-8290c57b0417" id="sec.333-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The holder must within 3 business days give the chief executive a notice about the discovery.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_133566b7-0829-45a6-8102-5c2ceec57896" id="sec.333-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The notice must give details of the discovery and any other information prescribed under a regulation.</txt><note guid="_e56f494f-c008-4344-9edb-ab09cb60af15" id="sec.333-ssec.3-note" type="example"><heading guid="_fc2f7f0d-6ac9-437c-af72-c4a54069aa35" id="sec.333-ssec.3-note-he">Note—</heading><block><txt break.before="1">If the holder is also a petroleum tenure holder, see also the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.544" target.doc.id="act-2004-025" target.guid="_f0d049b6-1597-4f07-8228-afea9494c1b3" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">section 544</legref> (Notice by petroleum tenure holder about discovery and commercial viability).</txt></block></note></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_96a4532a-ba03-4424-a24a-d8dd1a99600b" id="ch.5-pt.12-div.2"><no>Division 2</no><heading guid="_2177323a-c6ee-405a-ab31-b41ee164b515" id="ch.5-pt.12-div.2-he">General provisions for when authority ends or area reduced</heading><clause affected.by.uncommenced="0" guid="_879991b1-8374-4837-a4ac-3519ef239a1e" id="sec.334" provision.type="other" spent.amends="0"><no>334</no><heading guid="_3d879efb-6720-404b-99b1-2810eac66531" id="sec.334-he">Obligation to remove equipment and improvements</heading><subclause affected.by.uncommenced="0" guid="_699d5caf-fc85-42d4-9e50-3c907dc5e2b5" id="sec.334-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies for equipment or improvements in the area of a GHG authority or on access land for the authority that are being, or have been, used for an authorised activity for the authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_23e3490e-0221-4601-a250-3aa4fbeef99f" id="sec.334-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, this section does not apply for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b3eea79e-e680-414f-a3a3-47f7acb5b6fa" id="sec.334-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a GHG well or a pipeline; or</txt><note guid="_e4c5688b-efd7-44ff-b88a-13357b62f273" id="sec.334-ssec.2-para1.a-note" type="example"><heading guid="_d7ead03a-a4e3-493d-a7ac-1ef1a4b31347" id="sec.334-ssec.2-para1.a-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_c902c5a1-a04c-406b-a91c-355a84d1f3e5" id="sec.334-ssec.2-para1.a-note-para2.1" provision.type="other"><no>1</no><block><txt break.before="0">For GHG wells, see <intref check="valid" refid="ch.5-pt.5" target.guid="_736da620-e2e1-4349-b7aa-eefb5514b8c2">part 5</intref>, <intref check="valid" refid="ch.5-pt.5-div.2" target.guid="_b7c8dcd9-5cdd-4ead-b3f7-603e2cd252b8">division 2</intref> (Decommissioning of wells)</txt></block></li><li guid="_93b29217-43ad-4c56-b422-680b51bdb8ea" id="sec.334-ssec.2-para1.a-note-para2.2" provision.type="other"><no>2</no><block><txt break.before="0">For pipelines, see <intref check="valid" refid="sec.252" target.guid="_e552a73b-b0b7-4f27-8241-11a39215c7a3">section 252</intref> (Obligation to decommission pipelines on cessation or reduction of tenure).</txt></block></li></list></block></note></block></li><li guid="_1ef7fc58-930d-4e5a-a72b-bc1343e30595" id="sec.334-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">equipment or improvements on land that under <intref check="valid" refid="sec.48" target.guid="_5ddb6410-88fa-4e9c-909a-1535eab66cf5">section 48</intref>, ceases to be in the area of a GHG permit.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_504fb01d-3985-4e2f-a38b-8bd1d4c76a62" id="sec.334-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The holder of the GHG authority must before the removal day remove the equipment or improvements from the land unless the owner of the land otherwise agrees.</txt></block><penalty guid="_13237e43-af3c-40ec-b581-87540ac810b0" id="sec.334-ssec.3-pen"><block><txt break.before="1">Maximum penalty—1000 penalty units.</txt></block></penalty><note guid="_aca30b5b-ea4d-48e9-abe3-f526d7937af5" id="sec.334-ssec.3-note" type="example"><heading guid="_34221a8b-0957-45bc-9bdd-8ec987c4a99a" id="sec.334-ssec.3-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.393A" target.guid="_fc002d70-b11f-4c2c-bb3c-803ff65a1948">section 393A</intref>, to have also committed the offence.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_c63d15e2-d87c-4d63-b223-2b63cbb1d7d0" id="sec.334-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">To remove any doubt, it is declared that <intref check="valid" refid="sec.334-ssec.3" target.guid="_504fb01d-3985-4e2f-a38b-8bd1d4c76a62">subsection (3)</intref> applies even if the equipment or improvements are not owned by the holder.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1e2ec851-2bd0-4eb4-8658-967bd62ac321" id="sec.334-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_6440cde6-1ea7-4b13-8a2d-1252e2d05cd3" id="sec.334-ssec.5-def.equipment_"><txt break.before="1"><defterm guid="_ec0601ba-d77a-4bfd-864d-0f52a36eaae3" id="sec.334-ssec.5-def.equipment" type="definition">equipment</defterm> includes machinery and plant.</txt></definition><definition affected.by.uncommenced="0" guid="_e487c0f8-2f5e-4c11-82c3-38dd934e6d74" id="sec.334-ssec.5-def.removalday_"><txt break.before="1"><defterm guid="_e5abc828-ca88-4e22-b514-93e46585d746" id="sec.334-ssec.5-def.removalday" type="definition">removal day</defterm> means the latest of the following days—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_58cd7a4c-ed6d-406a-a726-48f5f400d12d" id="sec.334-ssec.5-def.removalday-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the earlier of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_92f0cfaf-4507-49b3-b1f7-b09d6d431701" id="sec.334-ssec.5-def.removalday-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the day the GHG authority ends;</txt></block></li><li guid="_fc030f0b-251b-456f-8376-e5e653de73a2" id="sec.334-ssec.5-def.removalday-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the day the land ceases to be in the GHG authority’s area;</txt></block></li></list></block></li><li guid="_43a129d3-f84f-4bef-927d-4e040eb071d4" id="sec.334-ssec.5-def.removalday-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if before the day provided for under <intref check="valid" refid="sec.334-ssec.5-def.removalday-para1.a" target.guid="_58cd7a4c-ed6d-406a-a726-48f5f400d12d">paragraph (a)</intref>, the Minister fixes a day—that day;</txt></block></li><li guid="_9aada1ab-9a50-4384-b1dd-8683388bc2e4" id="sec.334-ssec.5-def.removalday-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if before a day fixed under <intref check="valid" refid="sec.334-ssec.5-def.removalday-para1.b" target.guid="_43a129d3-f84f-4bef-927d-4e040eb071d4">paragraph (b)</intref>, the Minister fixes a later day—that day.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_ca432d81-8ad9-41ac-b4c7-3ca467086891" id="sec.335" provision.type="other" spent.amends="0"><no>335</no><heading guid="_b4c12d1d-4524-49e7-87bf-2daa4b4e2cb0" id="sec.335-he">Authorisation to enter to facilitate compliance</heading><subclause affected.by.uncommenced="0" guid="_e4dcbf49-4df3-48c1-9d1f-a1ba2cbd6282" id="sec.335-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may by notice authorise a former holder of a GHG authority to enter any of the following land to comply with, or remedy a contravention of, <intref check="valid" refid="sec.329" target.guid="_34367b1e-8b7d-4a93-bff5-510a01235a08">section 329</intref> or this division—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a5196890-342a-4b7a-b64b-4f8f7e8e19fc" id="sec.335-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the land to which <intref check="valid" refid="sec.329" target.guid="_34367b1e-8b7d-4a93-bff5-510a01235a08">section 329</intref> or this division applies (<defterm guid="_a895a122-53c2-4a5f-8e22-02588737ceda" id="sec.335-ssec.1-def.primaryland" type="definition">primary land</defterm>);</txt></block></li><li guid="_8aff1785-2d76-49c5-8ac5-980f49b1db3c" id="sec.335-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any other land (<defterm guid="_fa85edc1-048e-4cc4-92b0-d1b69c08440f" id="sec.335-ssec.1-def.secondaryland" type="definition">secondary land</defterm>) necessary or desirable to cross for access to the primary land.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e02b1633-13bc-4ecd-949c-ccc676ee50e7" id="sec.335-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.20" target.guid="_6a183a3b-a88c-4f09-9eea-0fc8117ffb80">Sections 20</intref> and <intref check="valid" refid="sec.331" target.guid="_23af4b49-d71a-4b15-b5f7-08207a109272">331</intref> and the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-2014-047" target.guid="_78e7ee55-dcff-4087-b0b9-13497e839af3" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">chapter 3</legref>, <legref check="valid" jurisd="QLD" refid="ch.3-pt.2" target.doc.id="act-2014-047" target.guid="_adcc85c6-c389-49c8-b998-858dca31ac1f" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">part 2</legref> (other than <legref check="invalid" jurisd="QLD" type="act">division 5</legref>) and <legref check="valid" jurisd="QLD" refid="ch.3-pt.3" target.doc.id="act-2014-047" target.guid="_bdb2d16b-be5f-49e4-add9-ce41b99ca361" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">parts 3</legref> and <legref check="valid" jurisd="QLD" refid="ch.3-pt.7" target.doc.id="act-2014-047" target.guid="_9e5d29e3-f634-4040-a21c-6073a407f144" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">7</legref> apply to the former holder of the authority as if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f3df9022-2d27-4815-a003-3df9ae5c387c" id="sec.335-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the GHG authority were still in force (the <defterm guid="_adbfcf16-47fc-4cb0-bd2d-54222de1c665" id="sec.335-ssec.2-def.notionalauthority" type="definition">notional authority</defterm>); and</txt></block></li><li guid="_4814ab8d-abc8-449a-92a5-0d4464383a3f" id="sec.335-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the former holder is the holder of the notional authority; and</txt></block></li><li guid="_49fe0814-0adc-4ce2-bd8f-ef37ec44c4f2" id="sec.335-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the primary land and any secondary land are in the notional authority’s area; and</txt></block></li><li guid="_b19c42d1-2707-4b95-9dd5-531ccc44cd16" id="sec.335-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the compliance or the remedying of the contravention were authorised activities for the notional authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_56262464-191b-44a1-8bfc-910c91d56475" id="sec.335-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the power under this section does not include the power to enter a structure or a part of a structure used for residential purposes without the consent of the occupier of the structure or part of the structure.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b9d24324-7b8a-4497-9929-8caabab6f905" id="sec.335-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the former holder intends to enter the land and any occupier of the land is present at the land, the former holder also must show or make a reasonable attempt to show the occupier the former holder’s authorisation under this section.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_52e9113b-f38f-4392-a865-e39e2e512683" id="ch.5-pt.12-div.3"><no>Division 3</no><heading guid="_575bb319-3cc3-462b-9a0c-82a8e5cac9ae" id="ch.5-pt.12-div.3-he">Provisions for authorised activities</heading><clause affected.by.uncommenced="0" guid="_fd65972c-7542-4a3c-8801-66bf37e9c0b5" id="sec.336" provision.type="other" spent.amends="0"><no>336</no><heading guid="_ff096a57-8d71-4689-b2da-c0f755f30cc6" id="sec.336-he">Authorised activities may be carried out despite rights of owner or occupier</heading><subclause affected.by.uncommenced="0" guid="_57e57983-9c81-4dcd-85e2-3cd91fe31cbb" id="sec.336-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The authorised activities for a GHG authority may be carried out despite the rights of an owner or occupier of land on which the activities are carried out.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2c78bc3c-e055-4e61-88f8-8d6e3512c3e9" id="sec.336-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.336-ssec.1" target.guid="_57e57983-9c81-4dcd-85e2-3cd91fe31cbb">subsection (1)</intref> applies for an authorised activity only if <intref check="valid" refid="sec.337" target.guid="_59aac301-d73f-4729-a7c4-b4fd44a87dc3">section 337</intref> does not prevent it from being carried out.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_59aac301-d73f-4729-a7c4-b4fd44a87dc3" id="sec.337" provision.type="other" spent.amends="0"><no>337</no><heading guid="_2cb454f1-2f83-4ffa-a6d8-6a163fd6f162" id="sec.337-he">General restrictions on right to carry out authorised activity</heading><subclause affected.by.uncommenced="0" guid="_0ccdb156-3578-456e-8e51-707f7e780c1c" id="sec.337-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The right under this Act to carry out an authorised activity for a GHG authority is subject to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b53d391e-adba-4954-b8ee-1fc5ed273dba" id="sec.337-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0"><intref check="valid" refid="ch.4" target.guid="_faefc638-342e-43b0-a5ed-6ae7a9f9a690">chapter 4</intref> and this chapter; and</txt></block></li><li guid="_3a14b8da-a9de-40c4-8962-2104e75952a9" id="sec.337-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">compliance with its holder’s rights and obligations under—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7a2f7b8c-3890-4cbb-9a87-c14b4a1a4785" id="sec.337-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">chapters 2 to 4; and</txt></block></li><li guid="_fd0d70ee-5a97-4f28-8637-e8dcd4c9ff3a" id="sec.337-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">this chapter; and</txt></block></li><li guid="_ffa5d45f-0be7-4e37-a7f3-d507784fefda" id="sec.337-ssec.1-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0"><intref check="valid" refid="sec.387" target.guid="_997ce6bd-e200-483b-a236-472a3a6fdecc">sections 387</intref> and <intref check="valid" refid="sec.388" target.guid="_9a63204e-7f93-4f3d-9a0c-e6609d4152b3">388</intref>; and</txt></block></li></list></block></li><li guid="_8c21d4ec-a065-4642-a3f6-545c589d6ae3" id="sec.337-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the mandatory conditions and the other conditions and provisions of the GHG authority; and</txt></block></li><li guid="_04bd8259-cd94-401b-be77-ab763c77865a" id="sec.337-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">any exclusion or restriction provided for in the GHG authority on the carrying out of the activities; and</txt></block></li><li guid="_7d6fdde2-9734-427d-b357-b18bc9f55ced" id="sec.337-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref> safety provisions; and</txt></block></li><li guid="_1f97222d-98da-4de2-a149-ed81936ae925" id="sec.337-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act"><name emphasis="no">Environmental Protection Act</name></legref>; and</txt></block></li><li guid="_9abfda4f-a085-4f76-93da-81262f607253" id="sec.337-ssec.1-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">any other relevant Act or law.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8de61e43-7596-4a3b-bcb7-33b3bfc6563d" id="sec.337-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Also, the right may be exercised only by the holder or someone that the holder has authorised under <intref check="valid" refid="sec.338" target.guid="_c16ee708-a60f-49ac-9778-9fa426bc76e9">section 338</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c16ee708-a60f-49ac-9778-9fa426bc76e9" id="sec.338" provision.type="other" spent.amends="0"><no>338</no><heading guid="_cb564e22-83d3-47fd-bb03-dacb69f61ce6" id="sec.338-he">Who may carry out authorised activity for GHG authority holder</heading><subclause affected.by.uncommenced="0" guid="_d5225db9-b909-4987-a123-2f7e81e4c0a3" id="sec.338-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An authorised activity for a GHG authority may be carried out for the holder by any of the following persons acting within the scope of the person’s authority from the holder—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bd3b6052-0790-4c78-8a9c-d9979b3612eb" id="sec.338-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the holder is a corporation—its officers and employees;</txt></block></li><li guid="_bd7554d2-0601-424b-ac54-25ccd33105f6" id="sec.338-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder’s employees or partners who are individuals;</txt></block></li><li guid="_ce7e1b66-0bbf-4bf6-8aa9-ed649c056f3c" id="sec.338-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">agents of or contractors for the holder;</txt></block></li><li guid="_d53c4093-d437-49a1-9b23-de38c0b19887" id="sec.338-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">officers and employees of or agents of or contractors for agents or contractors mentioned in <intref check="valid" refid="sec.338-ssec.1-para1.c" target.guid="_ce7e1b66-0bbf-4bf6-8aa9-ed649c056f3c">paragraph (c)</intref>.</txt></block></li></list><note guid="_0d444ef4-326f-4bb5-8f89-f2e1c7996346" id="sec.338-ssec.1-note" type="example"><heading guid="_975c5b24-9811-4bb1-9176-92f4cb0d3ad1" id="sec.338-ssec.1-note-he">Example—</heading><block><txt break.before="1">A GHG lease holder may also enter into a GHG coordination arrangement under which another party to the arrangement may carry out an authorised activity for the GHG lease. See <intref check="valid" refid="sec.186" target.guid="_780d2fa6-1285-4a39-bfdf-679d36f6ee8f">section 186</intref><intref check="valid" refid="sec.186-ssec.1" target.guid="_7e9850ac-b9ba-474d-84df-d456c7389b64">(1)</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_bef0f53c-beb1-4e03-938b-504a62e477b7" id="sec.338-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The authority may be express, or implied from—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_523ba439-fc36-4cc9-8c35-06045e53ab18" id="sec.338-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the nature of the relationship between the person and the holder; or</txt></block></li><li guid="_5b522902-071a-419a-b31f-a6acc05bb0c7" id="sec.338-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the duties the person performs for the holder; or</txt></block></li><li guid="_754e3c58-507e-4b0e-92b5-01ec3a2d95ee" id="sec.338-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the duties a person mentioned in <intref check="valid" refid="sec.338-ssec.1" target.guid="_d5225db9-b909-4987-a123-2f7e81e4c0a3">subsection (1)</intref> customarily performs.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8d882311-e729-46d8-99e8-36180bbf1082" id="sec.338A" provision.type="other" spent.amends="0"><no>338A</no><heading guid="_4b14aa65-2d52-4f5d-b6f3-10ba20de2814" id="sec.338A-he">Limitation of owner’s or occupier’s tortious liability for authorised activities</heading><subclause affected.by.uncommenced="0" guid="_6ccbd4a1-b2af-4307-a243-9016db7bdba1" id="sec.338A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to an owner or occupier of land in the area of a GHG authority if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1efe0c05-67bd-4366-a041-82aa36e69f69" id="sec.338A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">someone else carries out an authorised activity for a GHG authority holder on the land; or</txt></block></li><li guid="_2df6f370-3217-404c-8fca-334ace27c866" id="sec.338A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">someone else carries out an activity on the land and, in doing so, purports to be carrying out an authorised activity for a GHG authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5457d5b8-033d-4883-ab77-a344a651d376" id="sec.338A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The owner or occupier is not civilly liable to anyone else for a claim based in tort for damages relating to the carrying out of the activity.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b4578415-3015-4ee2-b2ec-e3616d92fa1c" id="sec.338A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.338A-ssec.2" target.guid="_5457d5b8-033d-4883-ab77-a344a651d376">subsection (2)</intref> does not apply to the extent the owner or occupier, or someone else authorised by the owner or occupier, caused, or contributed to, the harm the subject of the claim.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_47012ad6-f6eb-4f70-aa5e-0ec81d954524" id="sec.338A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">This section applies—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d288fb86-67cc-4bef-ba68-7b260969729e" id="sec.338A-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">despite any other Act or law; and</txt></block></li><li guid="_0e257132-ccdc-49b8-aa83-a2e30aa656e9" id="sec.338A-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">even though this Act or the GHG authority prevents or restricts the carrying out of the activity as an authorised activity for the authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6a679644-d788-4b67-ab9f-1c7f0ade80d0" id="sec.338A-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.338A-ssec.2" target.guid="_5457d5b8-033d-4883-ab77-a344a651d376">subsection (2)</intref>, in this section, the terms <defterm guid="_73c0c036-eeb5-48a2-ba81-f8a4dbb21f9b" type="mention">claim</defterm>, <defterm guid="_03c6ba5e-5fa0-4c0d-96b4-f785d53227fa" type="mention">damages</defterm> and <defterm guid="_d1349c43-f460-40bf-97a1-1294158e2006" type="mention">harm</defterm> have the same meaning that they have under the <legref check="valid" jurisd="QLD" target.doc.id="act-2003-016" target.version.series="3da8c74a-bece-420f-a619-0fc1148bae39" type="act"><name emphasis="yes">Civil Liability Act 2003</name></legref>.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_e7a57c0b-ba21-4f9c-aa1a-c2d293ff97fe" id="ch.5-pt.15"><no>Part 15</no><heading guid="_13c3eadf-ab71-4090-9e11-48a270dd86f6" id="ch.5-pt.15-he">Enforcement of end of authority and area reduction obligations</heading><clause affected.by.uncommenced="0" guid="_a963356b-31d0-46d1-ad14-0cf2ffeb6138" id="sec.356" provision.type="other" spent.amends="0"><no>356</no><heading guid="_e3ac6a2f-be06-42ee-8a83-d7bed2dd1957" id="sec.356-he">Power of authorised person to ensure compliance</heading><subclause affected.by.uncommenced="0" guid="_f1380b63-ad58-4738-a332-68bcb43a82ff" id="sec.356-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the holder, or former holder, of a GHG authority has not complied with <intref check="valid" refid="sec.267" target.guid="_0f9dc122-df5d-4fa0-90ae-718fa0e66f51">section 267</intref>, <intref check="valid" refid="sec.252" target.guid="_e552a73b-b0b7-4f27-8241-11a39215c7a3">252</intref> or <intref check="valid" refid="sec.334" target.guid="_879991b1-8374-4837-a4ac-3519ef239a1e">334</intref> in relation to land (the <defterm guid="_4e8fe671-2285-4e2f-a457-2cda0742a96c" id="sec.356-def.primaryland" type="definition">primary land</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_53c591bd-b6bf-4304-9637-7ece45e260ab" id="sec.356-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A person authorised (the <defterm guid="_5a3db767-6053-4d9b-aac2-7e0122b9cc55" id="sec.356-def.authorisedperson" type="definition">authorised person</defterm>) by the chief executive may by complying with <intref check="valid" refid="sec.357" target.guid="_3f23568b-a3cb-4a1f-bdf9-cd32b560ad63">section 357</intref> exercise the following powers (<defterm guid="_fde72038-2960-4cbb-9fa2-00c4d78baa80" id="sec.356-def.remedialpowers" type="definition">remedial powers</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fe82a6e7-e8b3-44d7-b50c-d5e93ffa0461" id="sec.356-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">enter the primary land and do all things necessary to ensure the requirement is complied with;</txt></block></li><li guid="_2ef3a19c-d7fe-45d1-b840-cc3902b8abf8" id="sec.356-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">enter any other land (<defterm guid="_b0b1bcba-e1ec-4ca5-bb4e-2bc3b5d67839" id="sec.356-ssec.2-def.secondaryland" type="definition">secondary land</defterm>) necessary or desirable to cross for access to the primary land.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d55c5851-a170-4c84-ba93-8c642cecb6e2" id="sec.356-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, remedial powers do not include power to enter a structure or a part of a structure used for residential purposes without the consent of the occupier of the structure or part of the structure.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4323460e-306c-4542-bd07-94edf5b44eb0" id="sec.356-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The authorisation—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2ac5e0cc-d871-40fa-a66a-a032886510fd" id="sec.356-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must be written; and</txt></block></li><li guid="_8f7a8cb5-5d6d-4d49-8408-e4771ffafaa6" id="sec.356-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">may be given on conditions the Minister considers appropriate.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3f23568b-a3cb-4a1f-bdf9-cd32b560ad63" id="sec.357" provision.type="other" spent.amends="0"><no>357</no><heading guid="_92036ab7-b23f-4331-8f09-aebd260b2bae" id="sec.357-he">Requirements for entry to ensure compliance</heading><subclause affected.by.uncommenced="0" guid="_6b2d1cb8-27e0-4531-a943-2de4d3e904ad" id="sec.357-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Remedial powers may be exercised for the primary or secondary land under <intref check="valid" refid="sec.356" target.guid="_a963356b-31d0-46d1-ad14-0cf2ffeb6138">section 356</intref> only if a following person is given notice of the proposed entry at least 10 business days before the proposed entry—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c1370f98-8ff0-48d7-b4a4-f89363da1057" id="sec.357-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the land has an occupier—any occupier of the land;</txt></block></li><li guid="_9ffb51d9-e306-4f8a-9aba-5fb7ebfef6fa" id="sec.357-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the land does not have an occupier—its owner.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_28adebf3-ae91-4a64-a412-a196939b1383" id="sec.357-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ddc169e8-619a-4f93-85a6-f10be0059064" id="sec.357-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">identify the authorised person; and</txt></block></li><li guid="_0bd398d0-748f-497c-a931-15126d5c6b9a" id="sec.357-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">describe the land; and</txt></block></li><li guid="_0011156c-c1e8-4969-a17c-081b9dcd910f" id="sec.357-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_197431d4-936b-45df-af15-24592049a711" id="sec.357-ssec.2-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">that the authorised person has under this section, been authorised to enter the land; and</txt></block></li><li guid="_1fb0735a-e76e-4255-8893-9a810662ceb9" id="sec.357-ssec.2-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the purpose of the entry; and</txt></block></li><li guid="_77f1bb2f-3453-466c-8ca5-511bfeb26c73" id="sec.357-ssec.2-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the period of the entry.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1e409fcf-7897-45db-8112-be765c832159" id="sec.357-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive may approve the giving of the notice by publishing it in a stated way.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_20374654-0fd5-474f-b63c-6922e6813366" id="sec.357-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive may give the approval only if satisfied the publication is reasonably likely to adequately inform the person to whom the notice is required to be given of the proposed entry.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fecba87e-86d4-4f19-a904-d7794033a70e" id="sec.357-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the authorised person intends to enter the land and any occupier of the land is present at the land, the person also must show or make a reasonable attempt to show the occupier the person’s authorisation under this section.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_4c82c8cb-fa8c-42b8-acfd-6e4c9bdfe21e" id="sec.358" provision.type="other" spent.amends="0"><no>358</no><heading guid="_83bde304-f77a-4382-9a6c-b39fcbdf1970" id="sec.358-he">Duty to avoid damage in exercising remedial powers</heading><block><txt break.before="1">In exercising remedial powers, a person must take all reasonable steps to ensure the person causes as little inconvenience, and does as little damage, as is practicable.</txt></block></clause><clause affected.by.uncommenced="0" guid="_dec4404b-1bc1-450f-aa99-66cb249c852c" id="sec.359" provision.type="other" spent.amends="0"><no>359</no><heading guid="_71cc0455-cf80-4c29-b0b6-cdc2114f2726" id="sec.359-he">Notice of damage because of exercise of remedial powers</heading><subclause affected.by.uncommenced="0" guid="_f78fa3cc-dfbe-4332-a4c2-5d3c78ea0928" id="sec.359-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a person exercising remedial powers damages land or something on it, the person must give the owner and any occupier of the land notice of the damage.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_50f28945-45a3-4e70-bc53-c665b748aa48" id="sec.359-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If for any reason it is not practicable to comply with <intref check="valid" refid="sec.359-ssec.1" target.guid="_f78fa3cc-dfbe-4332-a4c2-5d3c78ea0928">subsection (1)</intref>, the person must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3a8270fe-53ec-4966-8459-26b1af509481" id="sec.359-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">leave the notice at the place where the damage happened; and</txt></block></li><li guid="_ce6c4340-d5ac-4713-bf65-3ec596c432d4" id="sec.359-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">ensure it is left in a conspicuous place and in a reasonably secure way.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a6065e85-8bf4-4c34-a401-3b341f85f8aa" id="sec.359-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The notice must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ecaddb32-2bca-4fe1-b616-5480abb0ddf8" id="sec.359-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">particulars of the damage; and</txt></block></li><li guid="_1dc279d5-4b8f-403f-9879-e5cfd51b76bc" id="sec.359-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that the owner or occupier may claim compensation under <intref check="valid" refid="sec.360" target.guid="_f04b5efd-22c6-4b3b-b774-931e798ce2db">section 360</intref> from the State.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f04b5efd-22c6-4b3b-b774-931e798ce2db" id="sec.360" provision.type="other" spent.amends="0"><no>360</no><heading guid="_9d360dcb-9f80-4878-a421-6f9c38597890" id="sec.360-he">Compensation for exercise of remedial powers</heading><subclause affected.by.uncommenced="0" guid="_404327a2-d362-4952-a436-2fb8503c0a58" id="sec.360-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if an owner or occupier of land (the <defterm guid="_279864f7-7177-486c-ad60-61145259aa5c" id="sec.360-def.claimant" type="definition">claimant</defterm>) suffers a cost, damage or loss because of the exercise or purported exercise of remedial powers.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_24ae1648-f650-4c8b-a542-d0efad43103d" id="sec.360-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Compensation is payable to the claimant by the State for the cost, damage or loss.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7cab4fd5-86ec-416f-b7b2-6b9a7f19466b" id="sec.360-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The compensation may be claimed and ordered in a proceeding brought in a court of competent jurisdiction.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b479b1e0-d03a-4b8e-95f9-5307b64352e1" id="sec.360-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The court may order the compensation only if it is satisfied it is just to make the order in the circumstances of the particular case.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a9d4d206-68a6-4a0b-9977-2e7b85ae79d1" id="sec.361" provision.type="other" spent.amends="0"><no>361</no><heading guid="_aec7b4ab-3833-421e-941a-cd006365f330" id="sec.361-he">Ownership of thing removed in exercise of remedial powers</heading><subclause affected.by.uncommenced="0" guid="_22cb4a1c-2129-401d-a1c3-a629f197e2fe" id="sec.361-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3b0a1234-a939-460d-bd51-6b3ecc0bcce6" id="sec.361-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">remedial powers are exercised for land; and</txt></block></li><li guid="_a9941757-d424-415c-93f1-afacbd7c971c" id="sec.361-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">in the exercise of the powers a thing is removed from the land; and</txt></block></li><li guid="_8ae8ab83-8dcb-4c0e-ab53-6a4fe1735e8d" id="sec.361-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">immediately before the removal, the thing was the property of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_455bdad4-d68c-436d-bfa9-7c1727e8a9c4" id="sec.361-ssec.1-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the holder or former holder of a GHG authority about whom the powers were exercised; or</txt></block></li><li guid="_e7bfda3a-59b3-40a7-b277-b7a2833db50d" id="sec.361-ssec.1-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">an agent of or contractor for the holder.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a46e9433-6958-4d50-85fc-35f5db8708d7" id="sec.361-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On the removal, the thing becomes the property of the State.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0cb9f876-298d-4a60-9b64-fcddc8f76889" id="sec.361-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The State may deal with the thing as it considers appropriate, including for example, by destroying it or giving it away.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_cde1e223-3c6a-4578-ae14-aa2ba7ffebef" id="sec.361-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive may deal with the thing for the State.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ed0c9bce-3c88-4ce6-835c-073979bbc87c" id="sec.361-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the State sells the thing, the State may after deducting the costs of the sale return the net proceeds of the sale to the former owner of the thing.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_24e435aa-85e0-4c0e-838a-e1f009024a64" id="sec.362" provision.type="other" spent.amends="0"><no>362</no><heading guid="_e24d71dd-29ef-4d98-aba5-f726dfc08ecd" id="sec.362-he">Recovery of costs of and compensation for exercise of remedial power</heading><subclause affected.by.uncommenced="0" guid="_d3b4f95d-c5b0-41e3-9e1e-bece79ef55f0" id="sec.362-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The State may recover from the responsible person as a debt any—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7bd7640d-af63-4f8c-addc-5b7613cfa8b5" id="sec.362-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">reasonable costs the State or an authorised person under <intref check="valid" refid="sec.356" target.guid="_a963356b-31d0-46d1-ad14-0cf2ffeb6138">section 356</intref> incurs in exercising a remedial power; and</txt></block></li><li guid="_de052e56-69a5-416b-8ad1-b0edf604cb86" id="sec.362-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">compensation payable by the State under <intref check="valid" refid="sec.360" target.guid="_f04b5efd-22c6-4b3b-b774-931e798ce2db">section 360</intref> for the exercise of the remedial power.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_27be0a52-75ca-49ab-9b32-f9fc1b51051e" id="sec.362-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, in any proceeding to recover the costs, any relevant net proceeds of sale mentioned in <intref check="valid" refid="sec.361" target.guid="_a9d4d206-68a6-4a0b-9977-2e7b85ae79d1">section 361</intref> must be deducted from the amount claimed for the costs.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_26f444b5-d6b9-4ff6-80e2-302db96cfa05" id="sec.362-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_4c40c432-7f67-43f7-a5d4-8355397964c0" id="sec.362-ssec.3-def.relevantnetproceedsofsale_"><txt break.before="1"><defterm guid="_35b84184-59a7-468e-9627-190af42b6eb3" id="sec.362-ssec.3-def.relevantnetproceedsofsale" type="definition">relevant net proceeds of sale</defterm> means proceeds of sale under which the thing sold was the property of the responsible person immediately before its removal under <intref check="valid" refid="sec.361" target.guid="_a9d4d206-68a6-4a0b-9977-2e7b85ae79d1">section 361</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_076ac85b-3ff7-4631-abf8-d53a20369679" id="sec.362-ssec.3-def.responsibleperson_"><txt break.before="1"><defterm guid="_00c8fc3c-56af-4781-9ad4-98c424ac6c89" id="sec.362-ssec.3-def.responsibleperson" type="definition">responsible person</defterm> means the holder or former holder of the GHG authority about whom the remedial powers were exercised.</txt></definition></deflist></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_480c7115-d26f-4404-9071-10699fe7df7d" id="ch.5-pt.16"><no>Part 16</no><heading guid="_b03f945c-aa32-468f-9d28-c26e106520f9" id="ch.5-pt.16-he">Dealing with serious situations</heading><clause affected.by.uncommenced="0" guid="_1fe268eb-a505-4708-8648-2110ccbaf8af" id="sec.363" provision.type="other" spent.amends="0"><no>363</no><heading guid="_fb25ea1b-cc94-4f0f-a995-e648d3096ecd" id="sec.363-he">What is a serious situation</heading><block><txt break.before="1">A <defterm guid="_248ac296-13d9-4053-8fe0-469b516a7060" id="def.serioussituation" type="definition">serious situation</defterm> exists for a GHG storage reservoir if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_de7be03a-25a7-405c-b122-40d48f984893" id="sec.363-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a GHG stream injected into the reservoir has leaked; or</txt></block></li><li guid="_f3fbdeb9-b3a9-4b8d-a2b7-d1a58dab500f" id="sec.363-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">there is a significant risk that a GHG stream injected into the reservoir will leak from it; or</txt></block></li><li guid="_a9cda7eb-0cb0-42f7-9902-a44a7f95a31f" id="sec.363-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a GHG stream injected, being injected or to be injected into the reservoir has behaved or is behaving otherwise than as predicted in a relevant work program or development plan.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_577f9a3f-8e22-426b-9cf1-31fde7a434b1" id="sec.364" provision.type="other" spent.amends="0"><no>364</no><heading guid="_7114e70f-fb32-4231-b2b3-38f4ed134844" id="sec.364-he">Minister’s power to give direction</heading><subclause affected.by.uncommenced="0" guid="_80bf70b1-f8e7-4f80-bc3a-225d7e047142" id="sec.364-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the Minister reasonably believes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_57d11232-7a4e-4b59-901c-83b6ffafacb7" id="sec.364-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a serious situation exists or may exist for a GHG storage reservoir; and</txt></block></li><li guid="_2c4d1431-198c-4f17-82a2-53f8b0301421" id="sec.364-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a GHG tenure holder is in a position to take steps to remedy the situation or possible situation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5d678731-2a3d-4a4c-9db3-8c8975e01d4b" id="sec.364-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister may give the GHG tenure holder a direction (a <defterm guid="_6b10187c-d749-4740-bb46-6843123a193c" id="sec.364-def.serioussituationdirection" type="definition">serious situation direction</defterm>) to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_89c3e4e9-145e-447e-a329-3e6c38060f26" id="sec.364-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">stop injecting any GHG stream into the reservoir; or</txt></block></li><li guid="_feacb2f6-352c-47d3-90db-ad2fa6122106" id="sec.364-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">suspend the injection of any GHG stream into the reservoir for a stated period; or</txt></block></li><li guid="_1a4c9054-cfff-47d5-8df0-cbe620179b1b" id="sec.364-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">take steps reasonably necessary to remedy the situation within a stated reasonable period.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8326197c-8e84-4b4b-8f00-eb21f0f73a65" id="sec.364-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the direction requires the GHG tenure holder to take action mentioned in <intref check="valid" refid="sec.364-ssec.2" target.guid="_5d678731-2a3d-4a4c-9db3-8c8975e01d4b">subsection (2)</intref><intref check="valid" refid="sec.364-ssec.2-para1.c" target.guid="_1a4c9054-cfff-47d5-8df0-cbe620179b1b">(c)</intref> within a stated period, it may state the steps the Minister reasonably believes are necessary to remedy the serious situation within the period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bc558c75-ce6e-4f1b-a069-135599f54c0b" id="sec.364-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The direction may also require the GHG tenure holder to notify the Minister when the holder has complied with the direction.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f2d79f66-86d2-418d-b9a1-cf0a082aa9e8" id="sec.365" provision.type="other" spent.amends="0"><no>365</no><heading guid="_ff89c23a-90e0-411a-9b24-c17e6fe368d5" id="sec.365-he">Requirements for giving serious situation direction</heading><subclause affected.by.uncommenced="0" guid="_cda2bc12-fc2d-48d0-b4cc-dc4f2887afb3" id="sec.365-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A serious situation direction must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_917eeaa5-585c-421c-9229-2cba9986c467" id="sec.365-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that the Minister believes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6f54add9-fe15-43ce-a072-3e485f7951d4" id="sec.365-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a stated serious situation exists; and</txt></block></li><li guid="_4e1b43b9-4d0d-4877-a7a8-ce6aff9e8800" id="sec.365-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the GHG tenure holder given the direction is in a position to take steps to remedy the situation; and</txt></block></li></list></block></li><li guid="_758393d0-857a-4091-8758-8f969d776140" id="sec.365-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the reasons for the belief; and</txt></block></li><li guid="_d21409b2-71ee-4060-978b-3750c4b7cbc4" id="sec.365-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the requirements under the direction.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_491eeb0d-dbe9-4ce5-a3dd-9c8c3aee32b2" id="sec.365-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The direction must include or be accompanied by an information notice about the decisions to give the direction and to fix the period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_da880f77-67a6-4df4-933a-a492ebf7d73e" id="sec.365-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The direction may be given orally if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f433bfd4-f9ed-485e-bfc2-1cacf78ebd19" id="sec.365-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for any reason it is not practicable to give the direction in writing; and</txt></block></li><li guid="_f5f14bcc-fa24-4e39-b7ce-3401f480e1e2" id="sec.365-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Minister warns the person it is an offence not to comply with the direction.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_91b2016d-9e82-46a2-a2d3-def6bd568f60" id="sec.365-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If a serious situation direction is given orally, the Minister must confirm the direction by also giving it in writing as soon as practicable after giving it orally.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_ea80f044-40c4-43d1-9438-bb6c77f03d7e" id="sec.366" provision.type="other" spent.amends="0"><no>366</no><heading guid="_5a235167-9df4-44b4-9166-6933e20c6fb5" id="sec.366-he">Failure to comply with serious situation direction</heading><subclause affected.by.uncommenced="0" guid="_339b8d49-553c-4f90-8374-05fe470737a7" id="sec.366-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A GHG tenure holder to whom a serious situation direction has been given must comply with the direction.</txt></block><penalty guid="_4cc0a86f-b30c-4891-a36c-30c6cbf77c54" id="sec.366-ssec.1-pen"><block><txt break.before="1">Maximum penalty—1000 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_9bba8e82-e700-4ad2-856c-5f27172f4a04" id="sec.366-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.366-ssec.3" target.guid="_53d1d3a9-f8fd-4880-a0ba-925c488586ab">Subsections (3)</intref> and <intref check="valid" refid="sec.366-ssec.4" target.guid="_fd1f5848-e79c-42f8-8fd2-23506a9ad436">(4)</intref> apply if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0b36979e-9ee4-4220-b18a-f412affc94e3" id="sec.366-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the direction requires the GHG tenure holder to take steps reasonably necessary to remedy the serious situation the subject of the direction within a stated reasonable period; and</txt></block></li><li guid="_9eaf8374-2bed-4c90-9aa0-4806d3ec13ff" id="sec.366-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the direction states the steps the Minister reasonably believes are necessary to remedy the serious situation within the period.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_53d1d3a9-f8fd-4880-a0ba-925c488586ab" id="sec.366-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The GHG tenure holder is taken to have complied with the requirement if all of the stated steps are taken within the period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fd1f5848-e79c-42f8-8fd2-23506a9ad436" id="sec.366-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0"><intref check="valid" refid="sec.366-ssec.3" target.guid="_53d1d3a9-f8fd-4880-a0ba-925c488586ab">Subsection (3)</intref> does not prevent the GHG tenure holder from complying with the requirement in another way.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_ca10f4c1-6747-4175-9ec3-bf0e05663a42" id="sec.367" provision.type="other" spent.amends="0"><no>367</no><heading guid="_58eb07a7-4f81-4eaa-a508-8910c404d158" id="sec.367-he">Serious situation direction applies despite other instruments</heading><block><txt break.before="1">A serious situation direction applies despite any GHG tenure, work program, development plan or other instrument made or given under this Act.</txt></block></clause><clause affected.by.uncommenced="0" guid="_83d52065-1b5b-49cb-8915-03c74b17c49d" id="sec.368" provision.type="other" spent.amends="0"><no>368</no><heading guid="_73821c71-7be2-4350-a368-9cab8850335e" id="sec.368-he">Powers under <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref> not affected</heading><block><txt break.before="1">To remove any doubt, it is declared that this part does not limit—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c0ac041d-c152-4e26-8932-548814ea894b" id="sec.368-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the power to give a compliance direction or a dangerous situation direction under the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref>; or</txt></block></li><li guid="_b0745f76-bd7c-40bf-b25a-fc3faae3f302" id="sec.368-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">another power under the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref> safety provisions or <legref check="valid" jurisd="QLD" refid="ch.10" target.doc.id="act-2004-025" target.guid="_c24d1b74-938d-44f7-b0f2-d23cd9205275" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">chapter 10</legref> of that Act.</txt></block></li></list></block></clause></part><part affected.by.uncommenced="0" guid="_8991b18c-f634-4dcf-bdb3-5e57cfce4172" id="ch.5-pt.17"><no>Part 17</no><heading guid="_876c99fd-d820-4780-a628-cd9f30259768" id="ch.5-pt.17-he">Miscellaneous provisions</heading><clause affected.by.uncommenced="0" guid="_42614333-19e1-4e6c-bfb7-5a25e299d066" id="sec.369" provision.type="other" spent.amends="0"><no>369</no><heading guid="_1853c3dc-1e71-4792-919f-0d495dfcc280" id="sec.369-he">GHG authority does not create an interest in land</heading><block><txt break.before="1">The granting of a GHG authority does not create an interest in any land.</txt></block></clause><clause affected.by.uncommenced="0" guid="_2c168c8a-2d76-44af-b984-114e40e603bd" id="sec.369A" provision.type="other" spent.amends="0"><no>369A</no><heading guid="_dfff6b49-f87c-44be-82d9-0dae9a2d5ee0" id="sec.369A-he">Extinguishing GHG interests on the taking of land in a GHG authority’s area (other than by an easement)</heading><subclause affected.by.uncommenced="0" guid="_0324c6c1-d2f3-4f02-b2d9-1c40bae08337" id="sec.369A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the taking of land, other than by taking or otherwise creating an easement, under a resumption law.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9f1abf02-d41e-44e4-9b76-63a76a65c183" id="sec.369A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite any other <legref check="invalid" jurisd="QLD" type="act">Act</legref>, the taking of land does not extinguish GHG interests other than to the extent, if any, provided for in the resumption notice for the taking of the land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3c897a58-3fc2-426c-8a8a-c6b4d0c2a1dd" id="sec.369A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The resumption notice for the taking of land may provide for the extinguishment of a GHG interest on the taking only to the extent the relevant Minister for the taking is satisfied the interest is incompatible with the purpose for which the land is taken.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_89626fa6-d9b8-4fbd-b038-00a9efdc81f3" id="sec.369A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Without limiting the application of <intref check="valid" refid="sec.369A-ssec.3" target.guid="_3c897a58-3fc2-426c-8a8a-c6b4d0c2a1dd">subsection (3)</intref>, the relevant Minister may be satisfied a GHG interest is incompatible with the purpose for which the land is taken if, for that purpose, it is necessary to extinguish all interests in the land, including native title rights and interests.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_609a5b14-19d0-479a-8cb7-aad38cf3e297" id="sec.369A-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">A GHG interest may be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9f6990e8-283d-4e42-acc9-e85f437c36b7" id="sec.369A-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">wholly extinguished; or</txt></block></li><li guid="_ffa5d72d-06a2-4847-93bc-aaba54fdbf4e" id="sec.369A-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">partially extinguished by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_23282d4c-1462-43c5-bd62-efaf5d68ea53" id="sec.369A-ssec.5-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">excluding land from the land the subject of the interest; or</txt></block></li><li guid="_6fd474f1-3458-4fa9-966b-e1e73e1672b3" id="sec.369A-ssec.5-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">prohibiting the carrying out of activities by the holder of the interest.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_4e7e0384-63a4-4c41-b007-a9864998112d" id="sec.369A-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The resumption notice for the taking of land may provide for the extinguishment of GHG interests by reference to either or both of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e5a9c5ce-0195-45d2-a7ce-d5699c618c7d" id="sec.369A-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">stated land, which—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_abce7aae-1e49-467f-a441-a04bdb2233b4" id="sec.369A-ssec.6-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">may be all or part of the land that is taken; and</txt></block></li><li guid="_63d162b7-46e6-43ed-bf88-efff811a4c7c" id="sec.369A-ssec.6-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the stated land is only part of the land that is taken—may be described in the resumption notice in any way, including, for example—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6a13746e-6495-46de-8dc4-7e9cf23aa32a" id="sec.369A-ssec.6-para1.a-para2.ii-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">as a shape that does not constitute a block or sub-block; or</txt></block></li><li guid="_891b8799-9838-468e-87e6-153b08fda0a6" id="sec.369A-ssec.6-para1.a-para2.ii-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">by using 3 dimensionally located points to identify the position, shape and dimensions of each boundary;</txt></block></li></list></block></li></list></block></li><li guid="_55e445ee-ff8c-4332-ab9e-b1fe6fdeb50e" id="sec.369A-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">stated GHG interests, which may be all GHG interests or GHG interests of a particular type.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c0b4aa66-697e-4936-9668-64f73ec3d258" id="sec.369A-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">For the taking of land for which GHG interests are extinguished as provided by this section—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b291a7f7-cec8-4f07-9691-569398829304" id="sec.369A-ssec.7-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">each person’s interest in an extinguished GHG interest is converted into a right to claim compensation under the resumption law; and</txt></block></li><li guid="_a132c1d1-2766-41e2-8d39-d2afda707279" id="sec.369A-ssec.7-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the resumption law applies with necessary and convenient changes and with the changes mentioned in <intref check="valid" refid="sec.369A-ssec.8" target.guid="_86524f6e-3a6c-4c0d-b052-eebf9c39b3fa">subsections (8)</intref> and <intref check="valid" refid="sec.369A-ssec.9" target.guid="_57fc81cb-f35c-495e-8234-52cb0ae15fa4">(9)</intref> and <intref check="valid" refid="sec.369D" target.guid="_60efa99e-6afb-45ba-ab0b-41130879ac1f">section 369D</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_86524f6e-3a6c-4c0d-b052-eebf9c39b3fa" id="sec.369A-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">The notice of intention to resume for the proposed taking of the land must state the extent to which the GHG interests are proposed to be extinguished.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_57fc81cb-f35c-495e-8234-52cb0ae15fa4" id="sec.369A-ssec.9" provision.type="other"><no>(9)</no><block><txt break.before="0">The entity taking the land must give the chief executive a notice that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_50868336-bade-409d-b886-840e20011b59" id="sec.369A-ssec.9-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">states the details of the extinguishment; and</txt></block></li><li guid="_faa052b1-6e6a-4f8a-ab36-e5425d635037" id="sec.369A-ssec.9-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">asks for the extinguishment to be recorded in the register; and</txt></block></li><li guid="_de9eb759-960e-4c1e-ae71-ceab684108b1" id="sec.369A-ssec.9-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">is accompanied by a certified copy of the resumption notice.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d6790017-db09-4655-8811-038e6a11144f" id="sec.369A-ssec.10" provision.type="other"><no>(10)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_e36b09fa-86e9-476a-8c1d-68f05a44a6fc" id="sec.369A-ssec.10-def.certifiedcopy_"><txt break.before="1"><defterm guid="_d330635d-c04a-48d2-aaed-684adb7d7902" id="sec.369A-ssec.10-def.certifiedcopy" type="definition">certified copy</defterm>, of the resumption notice, means a copy of the original of the notice that has been certified by a justice of the peace as being a correct copy of the original notice.</txt></definition><definition affected.by.uncommenced="0" guid="_0f23fb60-8660-4d31-8f42-e728d9d991d3" id="sec.369A-ssec.10-def.relevantMinister_"><txt break.before="1"><defterm guid="_8412ca56-169b-4af3-9211-4f3285acd7f3" id="sec.369A-ssec.10-def.relevantMinister" type="definition">relevant Minister</defterm>, for the taking of land under a resumption law, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_275b14f1-8f2c-4327-85c3-4654844655ae" id="sec.369A-ssec.10-def.relevantMinister-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the land is taken under the process stated in the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="no">ALA</name></legref> (whether the land is taken under the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="no">ALA</name></legref> or another resumption law)—the Minister to whom the application that the land be taken is made under <legref check="valid" jurisd="QLD" refid="sec.9" target.doc.id="act-1967-048" target.guid="_ccac258c-f11f-46e8-b63c-f32ced927544" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act">section 9</legref> of that Act; or</txt></block></li><li guid="_913a4881-9bc1-43b1-8b64-520daf53e307" id="sec.369A-ssec.10-def.relevantMinister-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—the Minister administering the resumption law under which the land is, or is to be, taken.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d9b1575e-7c2a-404c-9b3e-19f30c1ce1e6" id="sec.369B" provision.type="other" spent.amends="0"><no>369B</no><heading guid="_bc87f4d0-9c80-49cb-afb5-caaea92fd42b" id="sec.369B-he">Effect of extinguishment of GHG interests on the taking of land in a GHG authority’s area (other than by taking an easement)</heading><subclause affected.by.uncommenced="0" guid="_fce50ee8-62c7-41e4-8f12-9f57d8ee515a" id="sec.369B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, under <intref check="valid" refid="sec.369A" target.guid="_2c168c8a-2d76-44af-b984-114e40e603bd">section 369A</intref>, the resumption notice for the taking of land (other than by taking or otherwise creating an easement) under a resumption law provides for the extinguishment of GHG interests for stated land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d902feb5-6a8d-46ce-a769-add5a69b38b6" id="sec.369B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the resumption notice states that all GHG interests relating to the stated land are extinguished and a GHG interest relates only to the stated land, the interest is wholly extinguished.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_777242e4-b077-4ab7-9353-815d601f3782" id="sec.369B-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the resumption notice states that all GHG interests relating to the stated land are extinguished and a GHG interest relates to the stated land and other land—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1fbfebd8-c284-4881-891d-08acd98ffa1c" id="sec.369B-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the stated land is no longer the subject of the interest; and</txt></block></li><li guid="_ffcc0cc9-dba1-4250-839f-f6aae512e954" id="sec.369B-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">without limiting <intref check="valid" refid="sec.369B-ssec.3-para1.a" target.guid="_1fbfebd8-c284-4881-891d-08acd98ffa1c">paragraph (a)</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0faf7d05-a751-4516-b32f-0d5ac9713645" id="sec.369B-ssec.3-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the stated land is excluded from the area of the GHG authority comprising the interest, or under or in relation to which the interest exists; and</txt></block></li><li guid="_36e6adf8-999a-4738-b052-6f1488939a80" id="sec.369B-ssec.3-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">this Act applies, in relation to the area of the GHG authority, with necessary and convenient changes to allow for the exclusion of the stated land, including, for example, to allow the area to include a part of a block or sub-block if the part is what is left after the stated land is excluded from the area.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_fa3bc58a-d9d1-4a3b-a90b-5871ea20909b" id="sec.369B-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the resumption notice states that the carrying out of stated activities on the stated land by holders of stated GHG interests is prohibited, the holder of a stated GHG interest is not, or is no longer, authorised to carry out the stated activities on the stated land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_39e7997f-e678-4899-a6ce-ac384d06faef" id="sec.369B-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.369B-ssec.3" target.guid="_777242e4-b077-4ab7-9353-815d601f3782">subsections (3)</intref> and <intref check="valid" refid="sec.369B-ssec.4" target.guid="_fa3bc58a-d9d1-4a3b-a90b-5871ea20909b">(4)</intref> do not apply in relation to a GHG interest that comprises, or exists under or in relation to, a new or renewed GHG authority granted after the land is taken.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_5d318eda-c04e-41c4-927c-5bfccbc8d0f8" id="sec.369C" provision.type="other" spent.amends="0"><no>369C</no><heading guid="_aebbbbaa-132a-45ad-ba25-87be8da158f5" id="sec.369C-he">Applications relating to land taken under a resumption law for which GHG interests were extinguished</heading><subclause affected.by.uncommenced="0" guid="_24ec06f9-8927-46ac-8815-563a1f0155f6" id="sec.369C-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may, under a grant provision, grant a new GHG authority for an area that includes acquired land only if the Minister, after consulting the entity that took the land, is satisfied the grant of the authority is compatible with the purpose for which the land is being or is to be used.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bf2f3b07-3bab-4085-8301-073d4b20c49c" id="sec.369C-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If there are 2 or more applications under this Act for the grant, under a grant provision, of a new GHG authority for an area that includes the same acquired land, the applications are to be dealt with as follows—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c25ef50f-2f7b-4b36-97c6-408b4de3c241" id="sec.369C-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the applications must be considered and decided according to the day on which they are made;</txt></block></li><li guid="_c7833f05-abd8-487b-b8f7-646e1a80c9fa" id="sec.369C-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the applications were made on the same day—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_010c92bc-57c4-450b-99d9-545c2b2388fb" id="sec.369C-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">they take the priority the Minister decides, after considering the relative merits of each application; and</txt></block></li><li guid="_e79fc894-d3f2-4cb6-9cef-4c61b83e29d4" id="sec.369C-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the Minister must give each applicant a notice stating there is competition for priority between the applicant’s application and another application, or other applications, made on the same day as the day on which the applicant’s application was made.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_59187cf4-0192-4064-a54e-c0433da91df0" id="sec.369C-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If a grant provision provides for the grant of a new GHG authority (the <defterm guid="_839362ff-358e-4c02-9b09-ec301fafceac" id="sec.369C-def.newauthority" type="definition">new authority</defterm>) over land in the area of an existing GHG authority (the <defterm guid="_23c8401e-999c-4ef7-a25b-a4470aec6536" id="sec.369C-def.existingauthority" type="definition">existing authority</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7af06e7d-f6f9-43c2-a91e-47827b3e1ebb" id="sec.369C-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the application under this Act for the new authority may include acquired land that was, immediately before the taking of the land, in the existing authority’s area; and</txt></block></li><li guid="_c9742cf4-a7ef-4485-b8f2-00fb247ab4a3" id="sec.369C-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">subject to <intref check="valid" refid="sec.369C-ssec.1" target.guid="_24ec06f9-8927-46ac-8815-563a1f0155f6">subsections (1)</intref> and <intref check="valid" refid="sec.369C-ssec.2" target.guid="_bf2f3b07-3bab-4085-8301-073d4b20c49c">(2)</intref>, the Minister may grant the new authority for an area that includes the acquired land as if the acquired land were in the existing authority’s area.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c1cdef75-6fa8-4272-bc68-77b99364a4f5" id="sec.369C-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">To remove any doubt, it is declared that this section does not affect the operation of the provisions of this Act about the application for, and grant of, a new GHG authority other than to the extent provided for in <intref check="valid" refid="sec.369C-ssec.1" target.guid="_24ec06f9-8927-46ac-8815-563a1f0155f6">subsections (1)</intref> to <intref check="valid" refid="sec.369C-ssec.3" target.guid="_59187cf4-0192-4064-a54e-c0433da91df0">(3)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5bf86ea6-5937-4748-8b62-bcdbd0f02beb" id="sec.369C-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_29cf1e6d-e13a-470b-9617-9f0f8e7e71b8" id="sec.369C-ssec.5-def.grantprovision_"><txt break.before="1"><defterm guid="_f464836f-90dd-4f88-836d-f995a9bbd59d" id="sec.369C-ssec.5-def.grantprovision" type="definition">grant provision</defterm> means a provision of this Act providing for the grant of a new GHG authority.</txt></definition><definition affected.by.uncommenced="0" guid="_97d1c428-7122-47f7-8693-6fce4297767f" id="sec.369C-ssec.5-def.newGHGauthority_"><txt break.before="1"><defterm guid="_4f3fe1cc-07d5-4497-bd02-40ab36e477c3" id="sec.369C-ssec.5-def.newGHGauthority" type="definition">new GHG authority </defterm>includes a renewed GHG authority.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_60efa99e-6afb-45ba-ab0b-41130879ac1f" id="sec.369D" provision.type="other" spent.amends="0"><no>369D</no><heading guid="_618c93d8-4ca9-48f1-96c8-71338f2bb861" id="sec.369D-he">Compensation for effect of taking of land in a GHG authority’s area on GHG interests</heading><subclause affected.by.uncommenced="0" guid="_c306fc11-b524-49a5-8e4d-fd015ac6294e" id="sec.369D-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if land in a GHG authority’s area is taken under a resumption law (including by taking or otherwise creating an easement).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4dbd3f40-8360-436e-8990-f4e7d2ab42a0" id="sec.369D-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In assessing any compensation to be paid to the holder of a GHG interest in relation to the taking of the land, allowance can not be made for the value of a GHG storage reservoir known or supposed to be in the land.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7ee124db-f6da-4bc7-9b6b-8e9a061103e5" id="sec.370" provision.type="other" spent.amends="0"><no>370</no><heading guid="_896c480c-f448-4be4-9425-76dd410faaf7" id="sec.370-he">Joint holders of a GHG authority</heading><subclause affected.by.uncommenced="0" guid="_a8b51ae2-8f20-456d-be96-ce22c3f221cf" id="sec.370-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A GHG authority may be held by 2 or more persons as joint tenants or as tenants in common.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7c1bb6df-d8d7-4d8c-8f93-7bc6673645f3" id="sec.370-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If—</txt><list number.type="manual" unnumbered.indent="0"><li change="insReplace" guid="_65d9ceb0-5d8a-4b81-914a-1cda0f338001" id="sec.370-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an application is made for a GHG authority, or for approval under the Common Provisions Act of a prescribed dealing that is a transfer of a GHG authority, for more than 1 proposed holder or transferee; and</txt></block></li><li change="delReplace" guid="_3bef8d13-dbab-4067-9694-c01ba20d6346-del" id="sec.370-ssec.2-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">an application is made for a GHG authority, or for approval to register a transfer of a GHG authority under the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, for more than 1 proposed holder or transferee; and</txt></block></li><li guid="_4ca306d4-9a60-4b96-ba61-7a0ed74c465c" id="sec.370-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the application does not show whether the proposed holders or transferees are to hold as joint tenants or as tenants in common; and</txt></block></li><li guid="_debdd6f3-b103-4a17-bdbe-acd0b476d132" id="sec.370-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the application is granted;</txt></block></li></list></block><block><txt break.before="1">the chief executive must record in the register that the applicants hold the GHG authority as tenants in common.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e23b263b-8a74-44f2-b2c2-61d04c1f0c97" id="sec.370-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_3170a265-d649-4496-96a4-c561f5a65e0b" id="sec.370-ssec.3-def.GHGauthority_"><txt break.before="1"><defterm guid="_f66ce0c8-7cb3-4892-a1cd-38fa6af019ac" id="sec.370-ssec.3-def.GHGauthority" type="definition">GHG authority</defterm> includes a share in a GHG authority.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7c597732-f910-46aa-a0ad-d42518a37ee7" id="sec.371" provision.type="other" spent.amends="0"><no>371</no><heading guid="_9d4a647b-86a8-4448-90b2-163642f23506" id="sec.371-he">Minister’s power to ensure compliance by GHG authority holder</heading><subclause affected.by.uncommenced="0" guid="_6fdebebb-faad-4ac0-b7c2-895ac9341b0c" id="sec.371-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bd8b0c71-fbca-441d-b111-da1c30540480" id="sec.371-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the holder of a GHG authority has not complied with a requirement under this Act, of the holder; and</txt></block></li><li guid="_d1a4ed59-13ce-435d-975f-faebfea5b0c3" id="sec.371-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">no other provision of this Act allows someone other than the holder to ensure compliance with the requirement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_21580875-c416-4bbf-a7a1-8f8a61d3b117" id="sec.371-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister may take any action the Minister considers appropriate to ensure all or part of the requirement is complied with if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_120dfa77-0b73-4271-b5a4-c7392643d005" id="sec.371-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0"><intref check="valid" refid="sec.371-ssec.3" target.guid="_f7571d2d-540e-415c-b104-83e62001507a">subsections (3)</intref> and <intref check="valid" refid="sec.371-ssec.4" target.guid="_fce07cff-2203-4338-a2c8-524f8bd2b081">(4)</intref> have been complied with; or</txt></block></li><li guid="_9d53f5a0-7f8c-4f04-8a60-65c85f9bee2a" id="sec.371-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder has agreed to the Minister taking the action.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f7571d2d-540e-415c-b104-83e62001507a" id="sec.371-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister must give the holder notice—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ea01c3ce-8647-4e9e-879d-9ba257794891" id="sec.371-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">stating the requirement and the action the Minister proposes to take; and</txt></block></li><li guid="_6f4b9391-4da2-41aa-82a2-dd9db45cd4ae" id="sec.371-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">inviting the holder to within a stated reasonable period make submissions to the Minister about the proposed action.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_fce07cff-2203-4338-a2c8-524f8bd2b081" id="sec.371-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The Minister must consider any submissions made by the holder within the stated period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_843f9382-0f95-46f4-a842-ef83a65a02c1" id="sec.371-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">A decision to take the action does not take effect until the holder is given an information notice about the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_208262ed-a6e6-4042-9c4b-6678139e9759" id="sec.371-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The State may recover from the holder as a debt any reasonable costs it incurs in the exercise of the power under <intref check="valid" refid="sec.371-ssec.2" target.guid="_21580875-c416-4bbf-a7a1-8f8a61d3b117">subsection (2)</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_cdf19c9f-040c-4850-bb53-64da3212970f" id="sec.372" provision.type="other" spent.amends="0"><no>372</no><heading guid="_fd685403-f769-42e9-b5e8-04ed14bad064" id="sec.372-he">Interest on amounts owing to the State</heading><subclause affected.by.uncommenced="0" guid="_2d6d895f-2004-4d86-a69a-ef1a739167fb" id="sec.372-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Interest is payable to the State on any amount owing under this Act by anyone to the State and unpaid from time to time after the relevant day.</txt><note guid="_d5d5eb77-1502-486b-be73-aac9b599f682" id="sec.372-ssec.1-note" type="example"><heading guid="_1f779d99-1a34-438b-aa6c-7871b0c859c9" id="sec.372-ssec.1-note-he">Examples of an amount that may be owing under this Act—</heading><block><txt break.before="1">annual or other rent and a civil penalty for non-payment of annual rent</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_94a0e393-e900-49c2-b41b-78e29fed17ae" id="sec.372-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The interest accrues daily at the rate prescribed under a regulation on the unpaid amount for the period starting on the day immediately after the amount became payable and ending on the day the amount owing on which interest is payable is paid in full, both days inclusive.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4cab3377-f518-4953-a6c9-90c83e851343" id="sec.372-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Any amount received in payment of the unpaid amount or the interest must first be applied in payment of the interest.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f1cabe10-a950-477c-be66-d0a8b681a19d" id="sec.372-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0"><intref check="valid" refid="sec.372-ssec.3" target.guid="_4cab3377-f518-4953-a6c9-90c83e851343">Subsection (3)</intref> applies despite any order or direction of the payer.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1e7c1182-1e15-41be-92d2-9ec3d13a9355" id="sec.372-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_5f6a4e92-9420-43a8-b172-c6384b2384f4" id="sec.372-ssec.5-def.relevantday_"><txt break.before="1"><defterm guid="_70679827-47a3-4123-b0f3-2ca903eefb3c" id="sec.372-ssec.5-def.relevantday" type="definition">relevant day</defterm> means the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2c42ed86-d141-4c85-992a-3f8b03b84ea9" id="sec.372-ssec.5-def.relevantday-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for an amount for annual or other rent or a civil penalty for non-payment of annual rent—the day that is 3 months after the last day for payment of the rent or civil penalty;</txt></block></li><li guid="_4a75dc78-a4bb-4878-a82a-9792a37bda39" id="sec.372-ssec.5-def.relevantday-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for another amount—the day the amount becomes owing.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8692006d-a12e-43cd-a916-4bb2f4238817" id="sec.373" provision.type="other" spent.amends="0"><no>373</no><heading guid="_81c6a110-64d5-4db9-bc4c-c91c09379b2f" id="sec.373-he">Recovery of unpaid amounts</heading><subclause affected.by.uncommenced="0" guid="_5ecd9771-62f8-4787-8dc8-e6d1bb59c7ec" id="sec.373-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a provision of this Act requires a GHG authority holder to pay the State an amount (including interest) the State may recover the amount from the holder as a debt.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d7d2f7af-103e-47e0-ada7-8564bebb81fb" id="sec.373-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_e2f9e525-40fd-4c85-ad9f-54658b722524" id="sec.373-ssec.2-def.holder_"><txt break.before="1"><defterm guid="_99642c8d-18bb-43fc-a236-3b7a6df285ff" id="sec.373-ssec.2-def.holder" type="definition">holder</defterm> includes a former holder of the GHG authority about whom the remedial powers were exercised.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_051788fc-cc5f-4206-b144-a3bec26444e4" id="sec.374" provision.type="other" spent.amends="0"><no>374</no><heading guid="_1577a4a8-1981-465b-876e-6365c4778244" id="sec.374-he">Power to correct or amend authority</heading><subclause affected.by.uncommenced="0" guid="_4a693176-8955-4d9a-91eb-1c8a26275768" id="sec.374-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may amend a GHG authority at any time by giving its holder a notice of the amendment and recording particulars in the relevant register if the amendment—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f90c980a-38b9-4eca-a503-4be65d058271" id="sec.374-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is to correct a clerical error; or</txt></block></li><li guid="_24589d89-77c5-4af9-8343-4331d8411278" id="sec.374-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is to state or more accurately state the boundaries of the area of the GHG authority because of a survey carried out under <intref check="valid" refid="sec.332" target.guid="_b5bd181b-1d4b-4c36-969b-3c0e9aaa5fc4">section 332</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_83b0905a-1fdb-4e48-b141-eee88b7af405" id="sec.374-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister may at any time amend a condition of the GHG authority if its holder authority agrees in writing.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b7898a17-a70a-4468-919c-a70731fa40b2" id="sec.374-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Despite <intref check="valid" refid="sec.374-ssec.1" target.guid="_4a693176-8955-4d9a-91eb-1c8a26275768">subsections (1)</intref> and <intref check="valid" refid="sec.374-ssec.2" target.guid="_83b0905a-1fdb-4e48-b141-eee88b7af405">(2)</intref>, the following can not be amended under this section—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3f933213-6a72-4157-8849-c019a673b3be" id="sec.374-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the mandatory conditions for that type of authority;</txt></block></li><li guid="_5824035d-a1d9-4732-921e-fcf85cbafd0c" id="sec.374-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the term of the GHG authority;</txt></block></li><li guid="_0a592900-e552-44ee-b2a6-448f45c8f585" id="sec.374-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">any work program or development plan for the GHG authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a21b9ee5-f0d7-44b0-8158-4fd8581b4fe1" id="sec.374-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Also, the Minister can not amend the GHG authority if the authority as amended would be inconsistent with a mandatory condition for that type of authority.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e6ecd736-7f5d-4534-864a-7ba406341177" id="sec.376" provision.type="other" spent.amends="0"><no>376</no><heading guid="_c7922b0d-3da1-4582-91b9-6629bdb8be3e" id="sec.376-he">Joint and several liability for conditions and for debts to State</heading><block><txt break.before="1">If more than 1 person holds a GHG authority each holder is jointly and severally—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b0281b05-5529-4d9f-8a88-fbfac4f06f56" id="sec.376-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">responsible for complying with its conditions; and</txt></block></li><li guid="_f2f7c833-9316-41c5-ae81-88f2cede68b6" id="sec.376-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">liable for all debts payable under this Act and unpaid by the GHG authority holder to the State.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_cb75cf13-ef34-4a3d-b498-4b99959dc651" id="sec.377" provision.type="other" spent.amends="0"><no>377</no><heading guid="_9c0312d1-abe1-4e17-afd4-386bfd2c5e97" id="sec.377-he">Notice of authority holder’s agents</heading><block><txt break.before="1">A person carrying out functions under this Act may refuse to deal with a person who claims to be acting as the agent of the holder of a GHG authority unless the holder has given the person notice of the agency.</txt></block></clause></part></chapter><chapter affected.by.uncommenced="0" guid="_7d5e1e7b-2211-4f5a-a0d2-4f87528fa54b" id="ch.6"><no>Chapter 6</no><heading guid="_39abb4d9-8632-42f3-93a0-da46a2819984" id="ch.6-he"><del xml:space="preserve">Conferences, investigations</del><ins xml:space="preserve">Investigations</ins> and enforcement</heading><part affected.by.uncommenced="0" change="delReplace" guid="_b5eab7cb-94a9-4e37-89ae-bdd8309c76ae-del" id="ch.6-pt.1A-del"><no>Part 1A</no><heading guid="_0b38ee71-a95a-4dfb-abc9-8181a37c2261-del" id="ch.6-pt.1A-he-del">Conferences with eligible claimants or owners and occupiers</heading><division affected.by.uncommenced="0" guid="_f10399a5-a28b-4523-ba84-0d061a3c661c-del" id="ch.6-pt.1A-div.1-del"><no>Division 1</no><heading guid="_11d97ab9-ebaf-4c10-86d1-70f144de5280-del" id="ch.6-pt.1A-div.1-he-del">Preliminary</heading><clause affected.by.uncommenced="0" guid="_be766b5b-850e-4ea8-b87b-6414afb4dddd-del" id="sec.377A-del" provision.type="other" spent.amends="0"><no>377A</no><heading guid="_a5e53845-c352-462d-941b-7d7d31b2df79-del" id="sec.377A-he-del">Application of <intref check="valid" refid="ch.6-pt.1A" target.guid="_b5eab7cb-94a9-4e37-89ae-bdd8309c76ae">pt 1A</intref></heading><subclause affected.by.uncommenced="0" guid="_68f160c8-23ed-4b64-937d-1795f6946d28-del" id="sec.377A-ssec.1-del" provision.type="other"><no>(1)</no><block><txt break.before="0">This part applies if an authorised officer is given a conference election notice by a GHG authority holder or an eligible claimant asking for a conference.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_117cebdc-1d9e-4009-a829-0e23c02d73d9-del" id="sec.377A-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">This part also applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_40b17038-ccb2-4025-abfd-3d11d8724ee7-del" id="sec.377A-ssec.2-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">an owner or occupier of land who is concerned about any of the following gives an authorised officer notice of the concerns—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_57445792-5f68-4dc5-98b9-70c8a717d77b-del" id="sec.377A-ssec.2-para1.a-para2.i-del" provision.type="other"><no>(i)</no><block><txt break.before="0">that someone claiming to act under a GHG authority, or to have entered land on the authority holder’s instructions—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_764448d6-a1b3-4b83-8e92-4a39f62eab1e-del" id="sec.377A-ssec.2-para1.a-para2.i-para3.A-del" provision.type="other"><no>(A)</no><block><txt break.before="0">is not authorised to be on the land; or</txt></block></li><li guid="_6bc98bad-2743-4862-8572-13253d043929-del" id="sec.377A-ssec.2-para1.a-para2.i-para3.B-del" provision.type="other"><no>(B)</no><block><txt break.before="0">is not complying with a provision of this Act or a condition of the GHG authority;</txt></block></li></list></block></li><li guid="_d46b5714-eefc-4583-849e-659730fc70b2-del" id="sec.377A-ssec.2-para1.a-para2.ii-del" provision.type="other"><no>(ii)</no><block><txt break.before="0">activities being, or proposed to be, carried out on the land apparently under a GHG authority (including when the activities are being, or are to be, carried out);</txt></block></li><li guid="_568067b0-6bf5-4329-97a4-c9f40633607e-del" id="sec.377A-ssec.2-para1.a-para2.iii-del" provision.type="other"><no>(iii)</no><block><txt break.before="0">the conduct on the land of someone apparently acting under a GHG authority; or</txt></block></li></list></block></li><li guid="_3e76de9f-2328-4665-bd90-f0d02569f128-del" id="sec.377A-ssec.2-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">a GHG authority holder who is concerned about something relevant to the authority involving the holder and the owner or occupier of land gives an authorised officer notice of the concerns; or</txt></block></li><li guid="_1b2e0007-d84d-4c0c-91de-f2f332ffb3ca-del" id="sec.377A-ssec.2-para1.c-del" provision.type="other"><no>(c)</no><block><txt break.before="0">for another reason, an authorised officer considers it desirable to call a conference to discuss concerns about a GHG authority.</txt></block></li></list></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_b4670fc2-6856-43a2-9c9a-86f49e5525f5-del" id="ch.6-pt.1A-div.2-del"><no>Division 2</no><heading guid="_9cf6055a-2510-4572-a100-3a7a15416105-del" id="ch.6-pt.1A-div.2-he-del">Calling conference and attendance</heading><clause affected.by.uncommenced="0" guid="_27854038-12c4-4dc6-89aa-b448112965af-del" id="sec.377B-del" provision.type="other" spent.amends="0"><no>377B</no><heading guid="_95d9dcb7-b2c2-4229-bc78-f0b3253f6b8e-del" id="sec.377B-he-del">Calling conference</heading><subclause affected.by.uncommenced="0" guid="_a9a4ed59-34c0-4414-aeab-a45a7e17a2e2-del" id="sec.377B-ssec.1-del" provision.type="other"><no>(1)</no><block><txt break.before="0">If this part applies because of the giving of a conference election notice, the authorised officer must, by notice, ask the GHG authority holder and the eligible claimant (the <defterm guid="_4b0d41ce-af80-48f9-b7f4-2188224e91d1-del" id="sec.377B-def.parties-del" type="definition">parties</defterm>) to attend a conference by the authorised officer.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b3501a6d-fe7e-4d44-8060-adce45969dfc-del" id="sec.377B-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">If this part applies under <intref check="valid" refid="sec.377A" target.guid="_be766b5b-850e-4ea8-b87b-6414afb4dddd">section 377A</intref><intref check="valid" refid="sec.377A-ssec.2" target.guid="_117cebdc-1d9e-4009-a829-0e23c02d73d9">(2)</intref>, the authorised officer may, by notice, ask the GHG authority holder and the owner or occupier or other person with an interest in the concerns (also the <defterm guid="_42364abd-78eb-4344-93be-294d71b1aa4a-del" id="sec.377B-def.parties-oc.2-del" type="definition">parties</defterm>) to attend a conference by the authorised officer about the concerns.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f7c8bd45-d9b4-41c8-9837-608ad20ba3b1-del" id="sec.377B-ssec.3-del" provision.type="other"><no>(3)</no><block><txt break.before="0">The notice must state when and where the conference will be held and what is to be discussed at the conference.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e5b82c41-7ba2-4448-a740-a9fb0e9dcdff-del" id="sec.377C-del" provision.type="other" spent.amends="0"><no>377C</no><heading guid="_792dff8c-ea3c-4f42-a183-f909b5455c41-del" id="sec.377C-he-del">Who may attend conference</heading><subclause affected.by.uncommenced="0" guid="_eefcd0e7-0453-4138-acaf-b4c4c6f2813f-del" id="sec.377C-ssec.1-del" provision.type="other"><no>(1)</no><block><txt break.before="0">Apart from the authorised officer, anyone given notice of the conference may attend and take part in the conference.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_305152a2-ddab-45f3-9073-c3fbf97e62ad-del" id="sec.377C-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">Also, with the authorised officer’s approval, someone else may be present to help a person attending the conference.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_57dec13b-1d89-4759-8668-f46085871e3b-del" id="sec.377C-ssec.3-del" provision.type="other"><no>(3)</no><block><txt break.before="0">However, a party can not be represented by a lawyer unless the parties agree and the authorised officer is satisfied there is no disadvantage to a party.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2a9bb432-6865-46ec-bb42-fd327f7d8357-del" id="sec.377D-del" provision.type="other" spent.amends="0"><no>377D</no><heading guid="_2de7e171-e1f7-46b2-adb9-a9369e9c2fee-del" id="sec.377D-he-del">What happens if a party does not attend</heading><subclause affected.by.uncommenced="0" guid="_1d9400fc-6acb-418b-b3fd-d9b4114daaa8-del" id="sec.377D-ssec.1-del" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a party given notice of a conference under <intref check="valid" refid="sec.377B" target.guid="_27854038-12c4-4dc6-89aa-b448112965af">section 377B</intref><intref check="valid" refid="sec.377B-ssec.2" target.guid="_b3501a6d-fe7e-4d44-8060-adce45969dfc">(2)</intref> does not attend.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_165e73b7-9f8a-406c-b178-be470e16aca5-del" id="sec.377D-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">The authorised officer may hold the conference even though someone given notice of it does not attend.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bceb8faa-469c-4547-ade9-3e424c8ac3f6-del" id="sec.377D-ssec.3-del" provision.type="other"><no>(3)</no><block><txt break.before="0">A party who attended the conference may apply to the Land Court for an order requiring the party who did not attend to pay the attending party’s reasonable costs of attending.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_123e98f3-517a-41d5-a603-a8a2c83629db-del" id="sec.377D-ssec.4-del" provision.type="other"><no>(4)</no><block><txt break.before="0">The Land Court must not order the party who did not attend to pay costs if it is satisfied the party had a reasonable excuse for not attending.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_abe2ca24-665d-4884-81a4-d18cb013b160-del" id="sec.377D-ssec.5-del" provision.type="other"><no>(5)</no><block><txt break.before="0">If the Land Court makes the order, it must decide the amount of the costs.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_25e018f0-20f3-4ca6-8324-52221a6fd294-del" id="ch.6-pt.1A-div.3-del"><no>Division 3</no><heading guid="_b232d1f9-f48a-4f0a-b98a-0a9f76b304c2-del" id="ch.6-pt.1A-div.3-he-del">Conduct of conference</heading><clause affected.by.uncommenced="0" guid="_ccfd29f8-03ac-49ed-811a-84ec02094539-del" id="sec.377E-del" provision.type="other" spent.amends="0"><no>377E</no><heading guid="_e8950dbb-23b4-4329-8ee8-8447450ec40d-del" id="sec.377E-he-del">Authorised officer’s role</heading><subclause affected.by.uncommenced="0" guid="_88129926-1f84-4457-a657-6847ed246fa3-del" id="sec.377E-ssec.1-del" provision.type="other"><no>(1)</no><block><txt break.before="0">In conducting the conference, the authorised officer must endeavour to help those attending to reach an early and inexpensive settlement of the subject of the conference.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9eb63139-f276-4b63-8589-5fdd9cdb1866-del" id="sec.377E-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">Subject to the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="invalid" jurisd="QLD" type="act">section 83B</legref>, the authorised officer is to decide how the conference is to be conducted.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_33885cfe-cf5a-4157-a82a-d93aae76ac01-del" id="sec.377F-del" provision.type="other" spent.amends="0"><no>377F</no><heading guid="_ee5a8c42-b96b-4493-9fcd-1854a8ca176a-del" id="sec.377F-he-del">Statements made at conference</heading><block><txt break.before="1">Nothing said by a person at the conference is admissible in evidence in a proceeding without the person’s consent.</txt></block></clause><clause affected.by.uncommenced="0" guid="_33561e5d-bec1-4eee-bf6e-8ecba849b2ee-del" id="sec.377G-del" provision.type="other" spent.amends="0"><no>377G</no><heading guid="_0d8f075f-4c7c-40c0-b70a-d8f86e28fc2b-del" id="sec.377G-he-del">Agreement made at conference</heading><subclause affected.by.uncommenced="0" guid="_6bc2469f-9bd9-45f8-849e-9302823dca64-del" id="sec.377G-ssec-del" provision.type="other"><block><txt break.before="0">If, at the conference, the parties negotiate an agreement about the concerns the subject of the conference, the agreement must be written and signed by or for the parties.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_92270366-b31c-4aef-875f-e3c82d5d0c76" id="ch.6-pt.1"><no>Part 1</no><heading guid="_059f90fa-52fa-41ef-8092-eb013a1788f9" id="ch.6-pt.1-he">Noncompliance action for GHG authorities</heading><division affected.by.uncommenced="0" guid="_897f30c6-3647-427d-b7fc-b4d3cb2125a5" id="ch.6-pt.1-div.1"><no>Division 1</no><heading guid="_69818b39-eec1-4c2b-ab19-1d19340543ae" id="ch.6-pt.1-div.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_f077cd8c-7ac7-4016-9e69-f836a407f8d0" id="sec.378" provision.type="other" spent.amends="0"><no>378</no><heading guid="_2c3cd96e-d0f1-4655-a4bc-c2f77830ac72" id="sec.378-he">Operation of <intref check="valid" refid="ch.6-pt.1-div.1" target.guid="_897f30c6-3647-427d-b7fc-b4d3cb2125a5">div 1</intref></heading><subclause affected.by.uncommenced="0" guid="_8fa8c223-ee00-451a-b91f-afe6d680c663" id="sec.378-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This division provides a process for noncompliance action against the holder of a GHG authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fd90758c-c18e-4093-ab32-793f0f21b471" id="sec.378-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The power to take noncompliance action under this part does not limit a power as follows (the <defterm guid="_6ad575dd-8b45-4742-af72-79f8be7f8a3c" id="sec.378-def.otherpower" type="definition">other power</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_69293bc4-f5a6-4c2c-a4d0-853ce027ea95" id="sec.378-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the power under <intref check="valid" refid="ch.5" target.guid="_c200371d-7276-455f-ab31-e74d811368e1">chapter 5</intref>, <intref check="valid" refid="ch.5-pt.6" target.guid="_8352f6c6-2394-4511-8804-dbb4959e798a">part 6</intref> to require new or additional security;</txt></block></li><li guid="_c6b32cae-b16b-43d7-9d4d-92e3054c35bf" id="sec.378-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a power under another provision of this Act to amend the GHG authority;</txt></block></li><li guid="_b2189950-9edc-4c5c-b903-149dd5840324" id="sec.378-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the power to give a dangerous situation or compliance direction under the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5460552c-fb04-47fb-a98a-6ad2e05cabd2" id="sec.378-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The other power does not limit the power to take noncompliance action.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_527dd574-ea46-4603-8a74-f713d3b90e71" id="sec.378-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Noncompliance action may be taken when the other power is exercised.</txt><note guid="_20fd92ed-b80a-428c-9a65-4bb49949d5d7" id="sec.378-ssec.4-note" type="example"><heading guid="_e98ce460-b8d4-4fd8-a167-0982a8dd1b38" id="sec.378-ssec.4-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_4a71a30a-4b44-4051-bed9-86b626266664" id="sec.378-ssec.4-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">The <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.10" target.doc.id="act-2004-025" target.guid="_c24d1b74-938d-44f7-b0f2-d23cd9205275" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">chapter 10</legref> includes provisions about investigating GHG storage activities and for the giving of compliance and dangerous situation directions concerning those activities.</txt></block></li><li guid="_4d9af32d-847a-40a8-98be-7d9cb8929213" id="sec.378-ssec.4-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">See also <intref check="valid" refid="ch.5" target.guid="_c200371d-7276-455f-ab31-e74d811368e1">chapter 5</intref>, <intref check="valid" refid="ch.5-pt.16" target.guid="_480c7115-d26f-4404-9071-10699fe7df7d">part 16</intref> (Dealing with serious situations).</txt></block></li></list></block></note></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_4a34cfff-6591-46d9-bc2f-76731451e393" id="ch.6-pt.1-div.2"><no>Division 2</no><heading guid="_5b439609-2904-4597-b1e4-f4da446e5f57" id="ch.6-pt.1-div.2-he">Noncompliance action by Minister</heading><clause affected.by.uncommenced="0" guid="_7bb5ce56-1401-4239-84f9-bb0e4d600312" id="sec.379" provision.type="other" spent.amends="0"><no>379</no><heading guid="_dfe2b146-0345-4e20-8c50-e96e789f3386" id="sec.379-he">Types of noncompliance action that may be taken</heading><subclause affected.by.uncommenced="0" guid="_1114e42f-311c-4d6a-b9fe-732194611d29" id="sec.379-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The noncompliance action the Minister may take under this division is all or any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_20c53d64-3186-43a5-93fb-6d44397b0e5d" id="sec.379-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">amending the GHG authority by doing all or any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4694d0ce-e662-41fb-9d8f-11565d4f5cf1" id="sec.379-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">for a GHG authority other than a GHG lease, reducing its term;</txt></block></li><li guid="_ad517993-b0cb-4c63-ad69-a4437d19bb50" id="sec.379-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">reducing its area;</txt><note guid="_cfe9f18c-15b5-4ccd-a7c2-ced926c050a5" id="sec.379-ssec.1-para1.a-para2.ii-note" type="example"><heading guid="_20e01f86-d5f0-4ab2-ac63-74abae29e444" id="sec.379-ssec.1-para1.a-para2.ii-note-he">Example of a possible reduction—</heading><block><txt break.before="1">A GHG permit holder has not in contravention of <intref check="valid" refid="sec.89" target.guid="_fc14f0f1-63b0-4624-b747-67f337fa3490">section 89</intref>, carried out work required under the work program for the permit. Noncompliance action may include amending the permit to reduce its area to reflect the work not carried out.</txt></block></note></block></li><li guid="_272c3639-c04d-43f8-bb1c-3db7fb6e5c83" id="sec.379-ssec.1-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">amending a condition of the GHG authority;</txt></block></li><li guid="_d3d2efa5-1dd8-4ba7-a71b-b291049d872c" id="sec.379-ssec.1-para1.a-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">imposing a new condition;</txt></block></li></list></block></li><li guid="_359a447f-cac5-4925-9810-2b57b9ac1c00" id="sec.379-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for a GHG authority other than a GHG lease, requiring its holder to relinquish a stated part of its area on or before a stated time;</txt></block></li><li guid="_bfee9a10-02a2-4a10-b88f-f6fde5a5c7aa" id="sec.379-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">cancelling the GHG authority, immediately or on a stated day;</txt></block></li><li guid="_e80c08c1-f78c-493e-a205-d06758aaa1e4" id="sec.379-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">if the GHG authority is a GHG tenure—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e678f386-9a72-4788-b36b-5970cf679d95" id="sec.379-ssec.1-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">withdrawing from a stated day, the approval of its work program or development plan; and</txt></block></li><li guid="_f1b1da3f-2dfd-4e2b-a1b4-62db6f0fb5e2" id="sec.379-ssec.1-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">directing its holder to, on or before that day, give the Minister the following document so that the Minister may decide whether to approve it—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_387599a6-6559-438a-bffc-5911957614bb" id="sec.379-ssec.1-para1.d-para2.ii-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">for a GHG permit—a proposed later work program that complies with the later work program requirements;</txt></block></li><li guid="_c4f883f2-a414-4e84-9483-a2612bc93782" id="sec.379-ssec.1-para1.d-para2.ii-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">for a GHG lease—a proposed later development plan that complies with the later development plan requirements;</txt></block></li></list></block></li></list></block></li><li guid="_bd2ff13e-86d2-40be-b3c0-238c790dc87f" id="sec.379-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">requiring the GHG authority holder to pay the State a penalty of an amount no more than the monetary value of 2000 penalty units.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_db372704-38f5-4c7e-b190-656cb0cf70e9" id="sec.379-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, a requirement under <intref check="valid" refid="sec.379-ssec.1" target.guid="_1114e42f-311c-4d6a-b9fe-732194611d29">subsection (1)</intref><intref check="valid" refid="sec.379-ssec.1-para1.e" target.guid="_bd2ff13e-86d2-40be-b3c0-238c790dc87f">(e)</intref> may be made only if the holder has agreed to the requirement being made instead of the taking other noncompliance action under <intref check="valid" refid="sec.379-ssec.1" target.guid="_1114e42f-311c-4d6a-b9fe-732194611d29">subsection (1)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_55e944a7-e1c5-4edc-85e6-d3d53e4f500b" id="sec.379-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A condition or amendment under <intref check="valid" refid="sec.379-ssec.1" target.guid="_1114e42f-311c-4d6a-b9fe-732194611d29">subsection (1)</intref> may restrict the authorised activities for the GHG authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ac30da79-c6fb-4751-b9ab-aaa75cb6d800" id="sec.379-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If under <intref check="valid" refid="sec.379-ssec.1" target.guid="_1114e42f-311c-4d6a-b9fe-732194611d29">subsection (1)</intref><intref check="valid" refid="sec.379-ssec.1-para1.c" target.guid="_bfee9a10-02a2-4a10-b88f-f6fde5a5c7aa">(c)</intref>, the GHG authority is cancelled on a stated day, a condition may be imposed under <intref check="valid" refid="sec.379-ssec.1" target.guid="_1114e42f-311c-4d6a-b9fe-732194611d29">subsection (1)</intref><intref check="valid" refid="sec.379-ssec.1-para1.a" target.guid="_20c53d64-3186-43a5-93fb-6d44397b0e5d">(a)</intref> restricting the authorised activities for the authority until the cancellation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e5ae4836-2de0-4a6f-9085-121c9ce82ee8" id="sec.379-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Noncompliance action may be taken despite the mandatory conditions for the GHG authority.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8bf7f66c-2108-467d-9c35-877f3d04eac0" id="sec.380" provision.type="other" spent.amends="0"><no>380</no><heading guid="_5055d4e0-911c-408f-bfc6-2b6585371b73" id="sec.380-he">When noncompliance action may be taken</heading><subclause affected.by.uncommenced="0" guid="_82162140-efa1-481c-8b47-606be3cfd894" id="sec.380-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Noncompliance action may be taken if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9903540b-6e29-4ea8-ad09-073cd9e813de" id="sec.380-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an event mentioned in <intref check="valid" refid="sec.380-ssec.2" target.guid="_2a8d4a5f-347f-49ab-bcfa-1cb3552bcf51">subsection (2)</intref> or <intref check="valid" refid="sec.380-ssec.3" target.guid="_c0d95462-dfb8-4234-b9b6-b43f55e4f263">(3)</intref> has happened; and</txt></block></li><li guid="_5a9685d3-b64d-42ee-b9c8-9ff30db57579" id="sec.380-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the procedure under <intref check="valid" refid="ch.6-pt.1-div.3" target.guid="_71158f74-50b2-4cef-af26-3a61102c42bf">division 3</intref> for taking the action has been followed; and</txt></block></li><li guid="_80a4c519-0d25-48c5-9544-5f1dcd97af66" id="sec.380-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the GHG authority for which the noncompliance action is taken relates to the event for which the action is taken.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2a8d4a5f-347f-49ab-bcfa-1cb3552bcf51" id="sec.380-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.380-ssec.1" target.guid="_82162140-efa1-481c-8b47-606be3cfd894">subsection (1)</intref>, the event is that the holder—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a6191c90-4e8d-4b0f-8110-987d0cde5b4a" id="sec.380-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">obtained the GHG authority because of a materially false or misleading representation or declaration made orally or in writing; or</txt></block></li><li guid="_8ff4a405-5bf0-44cf-8af7-ac177b46b616" id="sec.380-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">has failed to comply with this Act, a direction given under this Act or the GHG authority; or</txt></block></li><li guid="_156c2411-9cfd-4385-a25c-c49096acc2d5" id="sec.380-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">did not pay an amount under this Act by the day it became owing; or</txt></block></li><li guid="_ee26ecd6-d402-41b4-8002-f9ca6f95bd35" id="sec.380-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">has used any land in the GHG authority’s area for an activity that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0719d0cc-df0c-4315-8659-ef8b7565a539" id="sec.380-ssec.2-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">is not an authorised activity for the GHG authority or that, under any of the following Acts can not be carried out on the land—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d087b110-ec86-4129-8c67-b0683c7f72a7" id="sec.380-ssec.2-para1.d-para2.i-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.5" target.doc.id="act-2010-031" target.guid="_18ab3134-f9ef-4b7d-a156-de3b91cceaa3" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act">chapter 5</legref>, <legref check="valid" jurisd="QLD" refid="ch.5-pt.5" target.doc.id="act-2010-031" target.guid="_49a64e15-3723-417f-9736-b5fed5654c25" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act">part 5</legref>;</txt></block></li><li guid="_70b4bd24-1683-44ca-b075-bd7311c34378" id="sec.380-ssec.2-para1.d-para2.i-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.9" target.doc.id="act-1989-110" target.guid="_644f1d86-4673-4637-b599-a90421be58d4" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">chapter 9</legref>;</txt></block></li><li guid="_030b5705-de9e-4e52-ba07-841e0848ca0f" id="sec.380-ssec.2-para1.d-para2.i-para3.C" provision.type="other"><no>(C)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3A" target.doc.id="act-2004-025" target.guid="_4864cab3-5ae5-49c9-aeb6-cdfaa85590af" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">chapter 3A</legref>;</txt></block></li><li guid="_2b0f4ba8-b5f3-4d67-ac5b-2c325641f3e6" id="sec.380-ssec.2-para1.d-para2.i-para3.D" provision.type="other"><no>(D)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>, <legref check="valid" jurisd="QLD" refid="pt.6FA" target.doc.id="act-1923-026" target.guid="_a768d18e-e903-4424-baa1-0c4a0e83a582" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act">part 6FA</legref>; and</txt></block></li></list></block></li><li guid="_3d8e877e-5519-4241-8305-d47a4d5a9940" id="sec.380-ssec.2-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the holder can not otherwise lawfully carry out; or</txt></block></li></list></block></li><li guid="_ccf5c315-6664-4506-9b49-68069e95f7bf" id="sec.380-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">has used the GHG authority for a purpose other than for a purpose for which it was granted; or</txt></block></li><li guid="_27481278-f354-41f2-912d-378d46232df8" id="sec.380-ssec.2-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">has carried out or purported to carry out work under the GHG authority for which the GHG authority was not granted.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c0d95462-dfb8-4234-b9b6-b43f55e4f263" id="sec.380-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, it is an event for <intref check="valid" refid="sec.380-ssec.1" target.guid="_82162140-efa1-481c-8b47-606be3cfd894">subsection (1)</intref> if the holder is not or has ceased to be an eligible person.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_71158f74-50b2-4cef-af26-3a61102c42bf" id="ch.6-pt.1-div.3"><no>Division 3</no><heading guid="_a2db973b-4772-42a6-ae96-bf2e1312fc9f" id="ch.6-pt.1-div.3-he">Procedure for noncompliance action</heading><clause affected.by.uncommenced="0" guid="_cbda0117-080d-4931-abe5-60b342ffc816" id="sec.381" provision.type="other" spent.amends="0"><no>381</no><heading guid="_278f8ed5-b440-4348-b485-8ee9d316be8b" id="sec.381-he">Notice of proposed noncompliance action</heading><subclause affected.by.uncommenced="0" guid="_6517f1b5-c498-4d43-92ef-fadbacbc46c3" id="sec.381-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister must give the GHG authority holder a notice stating each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_65c393af-7b1d-4bc3-a4b3-97f69667d9a3" id="sec.381-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that the Minister proposes to take noncompliance action against the holder;</txt></block></li><li guid="_2b38b2c8-2285-46ac-842f-f362c8b93562" id="sec.381-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the types of noncompliance action that may be taken against the holder and the type likely to be taken;</txt></block></li><li guid="_7a249fad-8373-4919-aa3f-82b494b7f5b5" id="sec.381-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the grounds for taking noncompliance action against the holder;</txt></block></li><li guid="_7feeeb9e-a2fb-404c-8592-ae707f906c5b" id="sec.381-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the facts and circumstances that are the basis for the grounds;</txt></block></li><li guid="_1da4501d-04ad-4dcb-afbc-bde774c48e62" id="sec.381-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">that the holder may within a stated period make submissions to the Minister about the proposal to take noncompliance action.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_250ed322-c192-4018-a28a-3edef4e05226" id="sec.381-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice may state any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_07e0051d-b084-4faa-b92d-2f713107ee24" id="sec.381-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the noncompliance action is likely to include amending the GHG authority—the likely amendment;</txt></block></li><li guid="_b5acc9ea-897a-4d6f-9704-ce679a50568e" id="sec.381-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the amount of any likely reduction of the GHG authority’s area.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d6056114-d374-4b6d-9904-7a620f53621f" id="sec.381-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The stated period must be at least 20 business days after the holder is given the notice.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_bffee395-a74c-4615-822e-cb8a2b5f7813" id="sec.382" provision.type="other" spent.amends="0"><no>382</no><heading guid="_85167901-2791-4a53-abef-1a584ef55380" id="sec.382-he">Considering submissions</heading><subclause affected.by.uncommenced="0" guid="_e350c0db-02a7-4abb-bb7e-3a27c4e5f52a" id="sec.382-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister must consider any submissions made by the holder within the period stated in the notice given under <intref check="valid" refid="sec.381" target.guid="_cbda0117-080d-4931-abe5-60b342ffc816">section 381</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8277a978-e853-423b-a8a4-32816750c029" id="sec.382-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the Minister decides not to take noncompliance action the Minister must, as soon as practicable, give the holder a notice of the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_fe4c15d4-432f-4e49-8f57-03b68b4c7278" id="sec.383" provision.type="other" spent.amends="0"><no>383</no><heading guid="_956c9989-a342-4b68-8dc6-0a76cc6a6e70" id="sec.383-he">Decision on proposed noncompliance action</heading><subclause affected.by.uncommenced="0" guid="_83573dad-f027-44a9-bd63-9338e28c9ec2" id="sec.383-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If after complying with <intref check="valid" refid="sec.382" target.guid="_bffee395-a74c-4615-822e-cb8a2b5f7813">section 382</intref>, the Minister still believes a ground exists to take noncompliance action, the Minister may decide to take noncompliance action for the GHG authority relating to a ground stated in the notice given under <intref check="valid" refid="sec.381" target.guid="_cbda0117-080d-4931-abe5-60b342ffc816">section 381</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bfa03ed6-d2d6-4548-b883-21a51ad3c16f" id="sec.383-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister must in deciding whether to take the action have regard to whether the holder is a suitable person to hold or continue to hold the GHG authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_35b90f20-70c2-4ada-9193-e7f498cfd87c" id="sec.383-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In considering whether the holder is a suitable person to hold or to continue to hold the GHG authority the Minister must consider any criteria for deciding whether to grant an GHG authority of the same type.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_60e8aa95-c681-443c-af4a-54bb08ac68db" id="sec.384" provision.type="other" spent.amends="0"><no>384</no><heading guid="_f12d854b-8715-4edd-9738-3512bf65f344" id="sec.384-he">Notice and taking effect of decision</heading><subclause affected.by.uncommenced="0" guid="_e624bec1-98d4-4913-879c-023b0b405495" id="sec.384-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the Minister makes a decision under <intref check="valid" refid="sec.383" target.guid="_fe4c15d4-432f-4e49-8f57-03b68b4c7278">section 383</intref>, the person must after making the decision give an information notice about the decision to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_59082cd5-5f2a-4fc0-a673-4119ceddf208" id="sec.384-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the holder; and</txt></block></li><li guid="_be4cf62e-a492-4bd2-ac1c-b3dd081d6bb5" id="sec.384-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any other person who holds an interest in the GHG authority recorded in the register.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c1ecbfb9-75c1-4f1f-abfd-7ee5b67bfb96" id="sec.384-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Generally, the decision takes effect on the later of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8a3d9378-866f-4bf9-88b5-f7f7d7ce9982" id="sec.384-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the day the holder is given the information notice;</txt></block></li><li guid="_403afe89-7d2a-4977-995e-87978cebdecd" id="sec.384-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a later day of effect stated in the notice.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1b0c196c-b382-4408-98ca-3400a07965e1" id="sec.384-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, if the decision was to cancel the GHG authority, the decision does not take effect until the end of the appeal period for the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b623e9fb-c640-4632-a44d-6bd5aed1447d" id="sec.385" provision.type="other" spent.amends="0"><no>385</no><heading guid="_c1d576fd-6613-4bb9-bb28-007143895038" id="sec.385-he">Consequence of failure to comply with relinquishment requirement</heading><subclause affected.by.uncommenced="0" guid="_db3255ee-46d6-4092-8977-a42db5a0143f" id="sec.385-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d266369c-4370-4339-b416-a709a634fd84" id="sec.385-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">noncompliance action taken is a requirement under <intref check="valid" refid="sec.379" target.guid="_7bb5ce56-1401-4239-84f9-bb0e4d600312">section 379</intref><intref check="valid" refid="sec.379-ssec.1" target.guid="_1114e42f-311c-4d6a-b9fe-732194611d29">(1)</intref><intref check="valid" refid="sec.379-ssec.1-para1.b" target.guid="_359a447f-cac5-4925-9810-2b57b9ac1c00">(b)</intref>, of a GHG authority holder; and</txt></block></li><li guid="_0a3afe63-cf92-4a96-9d34-11014102e5b0" id="sec.385-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the requirement is not complied with.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b8694b30-9552-4e9a-bd49-8a937e52b01f" id="sec.385-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister must give the holder a notice requiring the holder to comply with the requirement under <intref check="valid" refid="sec.379" target.guid="_7bb5ce56-1401-4239-84f9-bb0e4d600312">section 379</intref><intref check="valid" refid="sec.379-ssec.1" target.guid="_1114e42f-311c-4d6a-b9fe-732194611d29">(1)</intref><intref check="valid" refid="sec.379-ssec.1-para1.b" target.guid="_359a447f-cac5-4925-9810-2b57b9ac1c00">(b)</intref> within 20 business days after the giving of the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bca77a25-6c7f-42d4-b07e-c2fca45ae560" id="sec.385-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the holder does not comply with the requirement under the notice, the GHG authority is cancelled.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9bc194e1-e079-4278-bc5d-cc46ad76affe" id="sec.385-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, the cancellation does not take effect until the Minister gives the holder a notice stating that the GHG authority has been cancelled because of the operation of <intref check="valid" refid="sec.385-ssec.3" target.guid="_bca77a25-6c7f-42d4-b07e-c2fca45ae560">subsection (3)</intref>.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_742448c6-ef8a-4382-8dfe-9cfb187eead3" id="ch.6-pt.2"><no>Part 2</no><heading guid="_70bf961a-a6aa-4eda-9c4a-9c73fd96751b" id="ch.6-pt.2-he">General offences</heading><division affected.by.uncommenced="0" guid="_ec728f85-582f-4b9d-b851-6658c0201635" id="ch.6-pt.2-div.1"><no>Division 1</no><heading guid="_af1a6faf-0574-44b2-8330-49c51f569565" id="ch.6-pt.2-div.1-he">Restrictions relating to GHG storage activities</heading><clause affected.by.uncommenced="0" guid="_47dc29d5-fcf5-4fca-81ba-0ab5605dca08" id="sec.386" provision.type="other" spent.amends="0"><no>386</no><heading guid="_434a9161-a3c5-44d9-9522-57e7615c93e4" id="sec.386-he">Restriction on GHG storage activities</heading><subclause affected.by.uncommenced="0" guid="_0aed92f5-5a0d-426e-91be-52a464a05bf7" id="sec.386-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not carry out a GHG storage activity in relation to land unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a32a2a09-9f20-47c9-a769-f520f9f57584" id="sec.386-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the activity is carried out under a GHG authority or a serious situation direction; or</txt></block></li><li guid="_d7daccc9-b7b8-429f-8cd6-984f87439d02" id="sec.386-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the carrying out of the activity is necessary to preserve life or property because of a dangerous situation or emergency that exists or may exist; or</txt></block></li><li guid="_5aa2ae87-860f-4c12-86c9-61c30147da36" id="sec.386-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the activity is the construction or operation of a GHG stream pipeline carried out under a pipeline licence; or</txt></block></li><li guid="_3a0809ae-81c0-4215-a17f-c4c2742cda67" id="sec.386-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the person—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c01ae73a-fda0-4563-b2fb-ed68f773b574" id="sec.386-ssec.1-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">is carrying out the activity for the State; and</txt></block></li><li guid="_58046f15-58c4-4a16-a6d7-76312c461c8b" id="sec.386-ssec.1-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">has, under <intref check="valid" refid="sec.420" target.guid="_0ce806ac-cb36-4dbc-b5bd-f8ef9441220b">section 420</intref>, been authorised for that purpose; and</txt></block></li><li guid="_2a99b76b-1490-4ff0-8fa3-d88422908cf0" id="sec.386-ssec.1-para1.d-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">is acting within the scope of that authority.</txt></block></li></list></block></li></list></block><penalty guid="_946697fa-3c6f-435b-b2a8-1ab424746d7f" id="sec.386-ssec.1-pen"><block><txt break.before="1">Maximum penalty—2000 penalty units.</txt></block></penalty><note guid="_8b9bc326-c0e6-4610-ab23-1853a62adc7a" id="sec.386-ssec.1-note" type="example"><heading guid="_c5449667-c91b-497a-98b5-cc00f2094f2c" id="sec.386-ssec.1-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may commit an offence against <intref check="valid" refid="sec.393" target.guid="_6323ef06-40ab-4149-8cba-6a582bd4aeb7">section 393</intref>.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_9deda48c-ab76-43ab-becd-751f1888dfc8" id="sec.386-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the activity is injecting a GHG stream into an underground reservoir, it is a defence to a proceeding for an offence against <intref check="valid" refid="sec.386-ssec.1" target.guid="_0aed92f5-5a0d-426e-91be-52a464a05bf7">subsection (1)</intref> for the defendant to prove that the injection—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_417eee69-973d-4f90-b792-706066f09a95" id="sec.386-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">was for the purpose of enhanced petroleum recovery and was authorised under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> or the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref>; and</txt></block></li><li guid="_c26bc1bb-6c31-4b29-adc4-36e74e1d40a5" id="sec.386-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">was for the purpose of production testing or geothermal production under the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref> and was authorised under that Act.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_997ce6bd-e200-483b-a236-472a3a6fdecc" id="sec.387" provision.type="other" spent.amends="0"><no>387</no><heading guid="_a8440bfc-1859-4632-bd92-8367a76c124a" id="sec.387-he">GHG tenure holder’s measurement obligations</heading><block><txt break.before="1">The holder of a GHG tenure must ensure—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dd985afc-eede-4cc8-901c-dee913967620" id="sec.387-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">GHG streams used for GHG stream storage in the GHG tenure’s area are measured by a meter; and</txt></block></li><li guid="_7ce2dd1d-3cd6-470b-8fad-91e4eb11cb0a" id="sec.387-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the meter complies with any requirements prescribed under a regulation; and</txt></block></li><li guid="_a3c28688-8e7a-495e-b5bf-3b49b3bd5db1" id="sec.387-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the measurement is made at the times and in the way prescribed under a regulation.</txt></block></li></list></block><penalty guid="_cd98379e-3590-4001-9599-8e147e635c53" id="sec.387-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></clause><clause affected.by.uncommenced="0" guid="_9a63204e-7f93-4f3d-9a0c-e6609d4152b3" id="sec.388" provision.type="other" spent.amends="0"><no>388</no><heading guid="_39e2adf8-254e-4b02-bec4-6565f18871c6" id="sec.388-he">Duty to avoid interference in carrying out GHG storage activities</heading><block><txt break.before="1">A person who carries out an authorised activity for a GHG authority must carry out the activity in a way that does not unreasonably interfere with anyone else carrying out a lawful activity.</txt></block><penalty guid="_c8da513f-aa91-4d61-948e-765964c01872" id="sec.388-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></clause></division><division affected.by.uncommenced="0" guid="_ad613375-336e-4463-b1d1-54f037949a09" id="ch.6-pt.2-div.2"><no>Division 2</no><heading guid="_cec8e245-690c-49af-ae40-834b63ef8810" id="ch.6-pt.2-div.2-he">Interference with authorised activities</heading><clause affected.by.uncommenced="0" guid="_32add06e-57dc-40c9-98ef-99043c787293" id="sec.389" provision.type="other" spent.amends="0"><no>389</no><heading guid="_75a823b8-72e4-4abc-8a11-7c7b94cf0538" id="sec.389-he">Obstruction of GHG authority holder</heading><subclause affected.by.uncommenced="0" guid="_a4cb4061-9eac-4b5c-b841-a9d05b65730a" id="sec.389-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not without reasonable excuse obstruct a GHG authority holder from—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_aa88b8fd-ea3c-4af8-a355-c4c435de420e" id="sec.389-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">entering or crossing land to carry out an authorised activity for the GHG authority if the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-2014-047" target.guid="_78e7ee55-dcff-4087-b0b9-13497e839af3" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">chapter 3</legref> to the extent the chapter is relevant, has been complied with for the entry; or</txt></block></li><li guid="_685af1e0-91d6-4ebe-95b3-f22e619129e7" id="sec.389-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">carrying out an authorised activity for the GHG authority on the land.</txt></block></li></list></block><penalty guid="_e2a475aa-5daf-4e70-980e-59ca269ff28a" id="sec.389-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_e4028947-882a-4d3e-af45-9d4a2f291c53" id="sec.389-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If a person has obstructed a GHG authority holder from carrying out an activity mentioned in <intref check="valid" refid="sec.389-ssec.1" target.guid="_a4cb4061-9eac-4b5c-b841-a9d05b65730a">subsection (1)</intref> and the holder decides to proceed with the carrying out of the activity, the holder must warn the person that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cb80a08e-d816-446a-b978-a62e97130931" id="sec.389-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">it is an offence to obstruct the holder unless the person has a reasonable excuse; and</txt></block></li><li guid="_b70dc5d7-a9c9-42a8-be3b-500a9c60e9b4" id="sec.389-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder considers the person’s conduct is an obstruction.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_36280988-66f8-4499-8e41-5742e6548f85" id="sec.389-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_35bae67b-d645-4590-925a-2cbd983b9d17" id="sec.389-ssec.3-def.obstruct_"><txt break.before="1"><defterm guid="_62cbfc7b-7b4c-4e6c-bff6-112485040ccf" id="sec.389-ssec.3-def.obstruct" type="definition">obstruct</defterm> includes assault, hinder, resist and attempt or threaten to assault, hinder, resist.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_cd51f6dd-b27c-4815-a714-da9dc2d23588" id="sec.390" provision.type="other" spent.amends="0"><no>390</no><heading guid="_780767fa-6478-44fd-8fc5-f129d3b6082d" id="sec.390-he">Restriction on building on pipeline land for GHG tenure</heading><subclause affected.by.uncommenced="0" guid="_9ca2de72-a2b5-4a2d-9db1-5397ae5bd0f0" id="sec.390-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if land is pipeline land for 1 or more GHG tenures.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9bc35321-6c4c-45e8-a718-05d55b8c1e81" id="sec.390-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A person other than a holder of any of the GHG tenures must not construct or place a structure on the land unless all the GHG tenure holders consent.</txt></block><penalty guid="_7d8fdabc-7db2-4af9-b02f-50468a49812e" id="sec.390-ssec.2-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause></clause><clause affected.by.uncommenced="0" guid="_ca8d292f-8a0a-4757-980b-cbb75042af81" id="sec.391" provision.type="other" spent.amends="0"><no>391</no><heading guid="_a16bbfa9-8fab-4c57-9e7a-9d293181bdf6" id="sec.391-he">Restriction on changing surface of pipeline land for a GHG tenure</heading><block><txt break.before="1">A person must not change the surface of pipeline land for a GHG tenure in a way that changes or may cause a change to the depth of burial of a pipeline unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9bd54f9d-4ceb-4b04-8964-c0137999d084" id="sec.391-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the GHG tenure holder consents; or</txt></block></li><li guid="_b9bdceb7-e182-46af-89b0-03ec8470ee34" id="sec.391-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the change is necessary to preserve life or property because of a dangerous situation or emergency that exists or may exist; or</txt></block></li><li guid="_455f2513-99db-4514-a9c2-66d18662a1e0" id="sec.391-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the change is a change to a public road by or for its public road authority; or</txt></block></li><li guid="_9b06505f-a2e7-4ed6-9b6b-7dacfa505972" id="sec.391-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the person has a reasonable excuse.</txt></block></li></list></block><penalty guid="_8536da8f-135a-4858-84e7-0e254884c3e4" id="sec.391-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></clause></division><division affected.by.uncommenced="0" guid="_76bda236-011b-469a-ac33-a043f97a1664" id="ch.6-pt.2-div.3"><no>Division 3</no><heading guid="_d7b5a295-6ead-46fd-85bf-847781fd7181" id="ch.6-pt.2-div.3-he">Other offences</heading><clause affected.by.uncommenced="0" guid="_41913032-1f8b-417f-a03e-4093a3d5cda4" id="sec.392" provision.type="other" spent.amends="0"><no>392</no><heading guid="_8aa2c041-a053-49a7-9f17-f9f6d24e0c26" id="sec.392-he">False or misleading information</heading><subclause affected.by.uncommenced="0" guid="_4f328d61-cfbf-4764-8f46-863a8aed2044" id="sec.392-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not make an entry in a document required to be kept under this Act knowing the entry is false or misleading in a material particular.</txt></block><penalty guid="_60ef88ed-a5b8-41cf-a8c5-a7aeebbe0679" id="sec.392-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty><note guid="_5b4f82d9-b1eb-4f23-9a86-df891677a57a" id="sec.392-ssec.1-note" type="example"><heading guid="_b01af38c-aa0a-4b3e-bb9f-0fe614a404be" id="sec.392-ssec.1-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.393A" target.guid="_fc002d70-b11f-4c2c-bb3c-803ff65a1948">section 393A</intref>, to have also committed the offence.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_b0fcb99e-c87e-4dd6-ac9d-266981d42950" id="sec.392-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A person of whom a direction or requirement under this Act has been made must not state anything or give a document or thing in response to the direction or requirement that the person knows is false or misleading in a material particular.</txt></block><penalty guid="_8675a014-c5c4-4030-bff2-8bb2677227ed" id="sec.392-ssec.2-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty><note guid="_bedb1fd7-e51c-442e-9a6a-d4b0f3cd7c8c" id="sec.392-ssec.2-note" type="example"><heading guid="_e3a9f78e-f4fc-4e77-8220-5bfad7524f0c" id="sec.392-ssec.2-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.393A" target.guid="_fc002d70-b11f-4c2c-bb3c-803ff65a1948">section 393A</intref>, to have also committed the offence.</txt></block></note></subclause></clause><clause affected.by.uncommenced="0" guid="_6323ef06-40ab-4149-8cba-6a582bd4aeb7" id="sec.393" provision.type="other" spent.amends="0"><no>393</no><heading guid="_a65abf32-99e9-4280-b8ba-02a3b0657f5c" id="sec.393-he">Liability of executive officer—offence committed by corporation against <intref check="valid" refid="sec.386" target.guid="_47dc29d5-fcf5-4fca-81ba-0ab5605dca08">s 386</intref><intref check="valid" refid="sec.386-ssec.1" target.guid="_0aed92f5-5a0d-426e-91be-52a464a05bf7">(1)</intref></heading><subclause affected.by.uncommenced="0" guid="_2c7c8048-1080-4cc8-bddc-f4aa603f9c31" id="sec.393-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An executive officer of a corporation commits an offence if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f52d73ff-01b5-406f-bf5e-5b977d6c73f8" id="sec.393-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the corporation commits an offence against <intref check="valid" refid="sec.386" target.guid="_47dc29d5-fcf5-4fca-81ba-0ab5605dca08">section 386</intref><intref check="valid" refid="sec.386-ssec.1" target.guid="_0aed92f5-5a0d-426e-91be-52a464a05bf7">(1)</intref>; and</txt></block></li><li guid="_4725188a-4002-4561-928a-3ad41984d580" id="sec.393-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the officer did not take all reasonable steps to ensure the corporation did not engage in the conduct constituting the offence.</txt></block></li></list></block><penalty guid="_18709e56-31c8-4ab7-8c7d-bad10f541a2f" id="sec.393-ssec.1-pen"><block><txt break.before="1">Maximum penalty—the penalty for a contravention of <intref check="valid" refid="sec.386" target.guid="_47dc29d5-fcf5-4fca-81ba-0ab5605dca08">section 386</intref><intref check="valid" refid="sec.386-ssec.1" target.guid="_0aed92f5-5a0d-426e-91be-52a464a05bf7">(1)</intref> by an individual.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_576e3935-5a51-4d7c-aff5-ba17cc60dc9d" id="sec.393-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In deciding whether things done or omitted to be done by the executive officer constitute reasonable steps for <intref check="valid" refid="sec.393-ssec.1" target.guid="_2c7c8048-1080-4cc8-bddc-f4aa603f9c31">subsection (1)</intref><intref check="valid" refid="sec.393-ssec.1-para1.b" target.guid="_4725188a-4002-4561-928a-3ad41984d580">(b)</intref>, a court must have regard to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9d1d9cae-d499-4457-9070-5d5ebe0d6f7d" id="sec.393-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">whether the officer knew, or ought reasonably to have known, of the corporation’s conduct constituting the offence against <intref check="valid" refid="sec.386" target.guid="_47dc29d5-fcf5-4fca-81ba-0ab5605dca08">section 386</intref><intref check="valid" refid="sec.386-ssec.1" target.guid="_0aed92f5-5a0d-426e-91be-52a464a05bf7">(1)</intref>; and</txt></block></li><li guid="_8fd90b79-f22b-419c-b086-351372e6fd30" id="sec.393-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether the officer was in a position to influence the corporation’s conduct in relation to the offence against <intref check="valid" refid="sec.386" target.guid="_47dc29d5-fcf5-4fca-81ba-0ab5605dca08">section 386</intref><intref check="valid" refid="sec.386-ssec.1" target.guid="_0aed92f5-5a0d-426e-91be-52a464a05bf7">(1)</intref>; and</txt></block></li><li guid="_9abfe820-5ff3-4330-99b4-cf6b59ba4a3f" id="sec.393-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">any other relevant matter.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1a954937-034f-4fde-87cd-083e13fd26ad" id="sec.393-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The executive officer may be proceeded against for, and convicted of, an offence against <intref check="valid" refid="sec.393-ssec.1" target.guid="_2c7c8048-1080-4cc8-bddc-f4aa603f9c31">subsection (1)</intref> whether or not the corporation has been proceeded against for, or convicted of, the offence against <intref check="valid" refid="sec.386" target.guid="_47dc29d5-fcf5-4fca-81ba-0ab5605dca08">section 386</intref><intref check="valid" refid="sec.386-ssec.1" target.guid="_0aed92f5-5a0d-426e-91be-52a464a05bf7">(1)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8dac64c2-198d-4d89-9d92-2e12eb1f284c" id="sec.393-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">This section does not affect—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3057e9e7-66f5-4a84-a7e7-73a5bf801388" id="sec.393-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the liability of the corporation for the offence against <intref check="valid" refid="sec.386" target.guid="_47dc29d5-fcf5-4fca-81ba-0ab5605dca08">section 386</intref><intref check="valid" refid="sec.386-ssec.1" target.guid="_0aed92f5-5a0d-426e-91be-52a464a05bf7">(1)</intref>; or</txt></block></li><li guid="_850bc855-eb02-414d-a706-afe765bd85c5" id="sec.393-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the liability, under the <legref check="valid" jurisd="QLD" target.doc.id="act-1899-009" target.version.series="19dc3aee-7313-4ba8-a7f6-7abf0c19b425" type="act"><name emphasis="no">Criminal Code</name></legref>, <legref check="valid" jurisd="QLD" refid="sch.1-pt.1-cg1-ch.2" target.doc.id="act-1899-009" target.guid="_5fc36681-7e72-4494-87ee-b33a031e6d6e" target.version.series="19dc3aee-7313-4ba8-a7f6-7abf0c19b425" type="act">chapter 2</legref>, of any person, whether or not the person is an executive officer of the corporation, for the offence against <intref check="valid" refid="sec.386" target.guid="_47dc29d5-fcf5-4fca-81ba-0ab5605dca08">section 386</intref><intref check="valid" refid="sec.386-ssec.1" target.guid="_0aed92f5-5a0d-426e-91be-52a464a05bf7">(1)</intref>.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_fc002d70-b11f-4c2c-bb3c-803ff65a1948" id="sec.393A" provision.type="other" spent.amends="0"><no>393A</no><heading guid="_3ceb61d2-6f8c-4047-8fea-fe4ae9647a89" id="sec.393A-he">Executive officer may be taken to have committed offence</heading><subclause affected.by.uncommenced="0" guid="_21687f7d-fd0c-40a5-9fbf-7084d228315f" id="sec.393A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a corporation commits an offence against a deemed executive liability provision, each executive officer of the corporation is taken to have also committed the offence if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c0ac3048-2d92-44f9-8eed-0f2fc034cc11" id="sec.393A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the officer authorised or permitted the corporation’s conduct constituting the offence; or</txt></block></li><li guid="_1b4415ed-f8a8-4abd-9928-0d7867a2e53e" id="sec.393A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the officer was, directly or indirectly, knowingly concerned in the corporation’s conduct.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_77f7d247-bde0-43ac-b84c-6888d424901d" id="sec.393A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The executive officer may be proceeded against for, and convicted of, the offence against the deemed executive liability provision whether or not the corporation has been proceeded against for, or convicted of, the offence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8ad05a0a-9210-47e9-b67e-8ee06bf26253" id="sec.393A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">This section does not affect either of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9681540b-5899-413a-bc71-b36153ea9d5b" id="sec.393A-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the liability of the corporation for the offence against the deemed executive liability provision;</txt></block></li><li guid="_51d03192-f1c4-4a5e-af3f-592d8fc3a2b9" id="sec.393A-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the liability, under the <legref check="valid" jurisd="QLD" target.doc.id="act-1899-009" target.version.series="19dc3aee-7313-4ba8-a7f6-7abf0c19b425" type="act"><name emphasis="no">Criminal Code</name></legref>, <legref check="invalid" jurisd="QLD" refid="ch.2" target.doc.id="act-1899-009" target.version.series="19dc3aee-7313-4ba8-a7f6-7abf0c19b425" type="act">chapter 2</legref>, of any person, whether or not the person is an executive officer of the corporation, for the offence against the deemed executive liability provision.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0310d8da-f146-45ab-90e8-001c29074bbb" id="sec.393A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_e9ac0db6-940a-41f5-b90a-008b0fefda81" id="sec.393A-ssec.4-def.deemedexecutiveliabilityprovision_"><txt break.before="1"><defterm guid="_cf49cbc9-80c8-435c-a822-11b92fd9d3a0" id="sec.393A-ssec.4-def.deemedexecutiveliabilityprovision" type="definition">deemed executive liability provision </defterm>means any of the following provisions—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c7d72779-3bcd-4cdf-b0f1-c4d4c182f19a" id="sec.393A-ssec.4-def.deemedexecutiveliabilityprovision-para1" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="sec.264" target.guid="_49fc55b1-72d9-4d0a-8d48-9b4378cf8f42">section 264</intref></txt></block></li><li guid="_b3dc453f-9f8f-499a-b34d-ec4c53118ccf" id="sec.393A-ssec.4-def.deemedexecutiveliabilityprovision-para1-oc.2" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="sec.334" target.guid="_879991b1-8374-4837-a4ac-3519ef239a1e">section 334</intref><intref check="valid" refid="sec.334-ssec.3" target.guid="_504fb01d-3985-4e2f-a38b-8bd1d4c76a62">(3)</intref></txt></block></li><li guid="_3323bd4b-8584-48db-8667-962951c64bdc" id="sec.393A-ssec.4-def.deemedexecutiveliabilityprovision-para1-oc.3" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="sec.392" target.guid="_41913032-1f8b-417f-a03e-4093a3d5cda4">section 392</intref><intref check="valid" refid="sec.392-ssec.1" target.guid="_4f328d61-cfbf-4764-8f46-863a8aed2044">(1)</intref></txt></block></li><li guid="_ab4aa919-c219-4086-aa70-2c7fed2bc5ba" id="sec.393A-ssec.4-def.deemedexecutiveliabilityprovision-para1-oc.4" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="sec.392" target.guid="_41913032-1f8b-417f-a03e-4093a3d5cda4">section 392</intref><intref check="valid" refid="sec.392-ssec.2" target.guid="_b0fcb99e-c87e-4dd6-ac9d-266981d42950">(2)</intref>.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_dee08e7c-e395-4056-829e-750d177ce661" id="sec.394" provision.type="other" spent.amends="0"><no>394</no><heading guid="_e9ab8cc8-1fcf-47e8-8765-c84f255a1f06" id="sec.394-he">Attempts to commit offences</heading><subclause affected.by.uncommenced="0" guid="_1ab6c8eb-dc5e-49f1-85d3-b1280c993b19" id="sec.394-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person who attempts to commit an offence against this Act commits an offence.</txt></block><penalty guid="_826551f1-32dd-4f01-b2c2-65a3300c2e73" id="sec.394-ssec.1-pen"><block><txt break.before="1">Maximum penalty for an attempt—half the maximum penalty for the completed offence.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_ba91dc57-e00c-4317-acc4-8c37877b4d9b" id="sec.394-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The <legref check="valid" jurisd="QLD" target.doc.id="act-1899-009" target.version.series="19dc3aee-7313-4ba8-a7f6-7abf0c19b425" type="act"><name emphasis="no">Criminal Code</name></legref>, <legref check="valid" jurisd="QLD" refid="sch.1-sec.4" target.doc.id="act-1899-009" target.guid="_8f9a19e2-98b1-427c-bff2-07359a99ef94" target.version.series="19dc3aee-7313-4ba8-a7f6-7abf0c19b425" type="act">section 4</legref> applies to <intref check="valid" refid="sec.394-ssec.1" target.guid="_1ab6c8eb-dc5e-49f1-85d3-b1280c993b19">subsection (1)</intref>.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_a0c93db4-037d-4d4a-b1b1-4f80adc68a10" id="ch.6-pt.3"><no>Part 3</no><heading guid="_47bc736c-e50d-4b71-9a89-268db06d981c" id="ch.6-pt.3-he">Appeals</heading><clause affected.by.uncommenced="0" guid="_9afc7be7-8e98-4cca-9761-7aa32e8da8d8" id="sec.395" provision.type="other" spent.amends="0"><no>395</no><heading guid="_a1b3e7d0-2e8e-479b-b99b-b720bb112370" id="sec.395-he">Who may appeal</heading><subclause affected.by.uncommenced="0" guid="_217ad84e-df19-48c6-9a91-b010d6e9e90c" id="sec.395-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person whose interests are affected by a decision of the Minister identified in <intref check="valid" refid="sch.1" target.guid="_aa7d85fe-e407-4e5c-a7c6-7f5868e466fb">schedule 1</intref> may appeal against the decision to the Land Court.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9d048b77-8cd2-406a-adc8-72feb773f459" id="sec.395-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For this section, a person who has been given or is entitled to be given an information notice about a decision is taken to be a person whose interests are affected by the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_24687ac2-2ef4-4827-b9da-eb093481d185" id="sec.396" provision.type="other" spent.amends="0"><no>396</no><heading guid="_457d89eb-5aa8-4b67-81d6-cbdb8f021c22" id="sec.396-he">Period to appeal</heading><subclause affected.by.uncommenced="0" guid="_611c770d-33d1-47cc-80b0-cb8ba466d4fe" id="sec.396-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The appeal must be started within 20 business days after—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_33829cf6-31e5-4464-8a0c-02b308c40429" id="sec.396-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for an appeal from a review decision—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4983995c-fa76-40af-8858-0f9e9b022c4b" id="sec.396-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">if the person has been given a review notice about the review decision to which the appeal relates—the day the person is given the notice; or</txt></block></li><li guid="_07397f63-fc92-4dcf-8f84-3586d685d92b" id="sec.396-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if <intref check="valid" refid="sec.396-ssec.1-para1.a-para2.i" target.guid="_4983995c-fa76-40af-8858-0f9e9b022c4b">subparagraph (i)</intref> does not apply—the day the person otherwise becomes aware of the review decision; or</txt></block></li></list></block></li><li guid="_75c9e475-fd47-4c4e-837c-83d41b350b7b" id="sec.396-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for an appeal from another decision—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_90f2f068-a9fe-4d61-af72-96d536112621" id="sec.396-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">if the person has been given an information notice about the decision—the day the person is given the notice; or</txt></block></li><li guid="_4fb57dea-5b4e-4373-adc7-b65572327aed" id="sec.396-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if <intref check="valid" refid="sec.396-ssec.1-para1.b-para2.i" target.guid="_90f2f068-a9fe-4d61-af72-96d536112621">subparagraph (i)</intref> does not apply—the day the person otherwise becomes aware of the decision.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ae5fe8da-99c4-4c3d-9531-fb991325b51b" id="sec.396-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the Land Court may at any time within the 20 business days extend the period for making an appeal.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_726717c4-f7ae-4f93-886e-8ed8523d8d0c" id="sec.397" provision.type="other" spent.amends="0"><no>397</no><heading guid="_37d3368d-d133-479d-a479-f403bf5db951" id="sec.397-he">Starting appeal</heading><subclause affected.by.uncommenced="0" guid="_507c2037-5fbd-4cbf-9039-d768247436d4" id="sec.397-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The appeal is started by filing a written notice of appeal with the Land Court.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ab6d3edd-6bcc-43c2-bf1e-325f8c534ec0" id="sec.397-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The appellant must give the chief executive a copy of the notice.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_4a69f053-2b56-4d88-add4-aedf22e42562" id="sec.398" provision.type="other" spent.amends="0"><no>398</no><heading guid="_9b950251-74b6-48c7-9737-bea5849a725a" id="sec.398-he">Stay of operation of decision</heading><subclause affected.by.uncommenced="0" guid="_778ed82e-3831-40ae-9076-e84a0caf42ff" id="sec.398-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Land Court may grant a stay of the decision to secure the effectiveness of the appeal.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2e4272bf-af47-447f-a64e-2730488993c5" id="sec.398-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A stay—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6993a25f-f6e9-422c-ad92-57e27e5e7ba4" id="sec.398-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">may be given on the conditions the Land Court considers appropriate; and</txt></block></li><li guid="_cffd4cbf-4bda-4dc0-ac0f-542eae9f91c8" id="sec.398-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">operates for the period fixed by the Land Court; and</txt></block></li><li guid="_e55fea00-eeb3-4cdc-995d-44de726f3fbf" id="sec.398-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">may be amended or cancelled by the Land Court.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_4c5420e0-5412-46ee-8995-15b6853e8285" id="sec.398-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The period of a stay under this section must not extend past the time when the Land Court decides the appeal.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a785a6a8-af60-4154-95e8-e4a834abc301" id="sec.398-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The appeal affects the decision or carrying out of the decision only if it is stayed.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_22a1aeb5-c7f5-41b5-9e3b-eab97ce8bb28" id="sec.399" provision.type="other" spent.amends="0"><no>399</no><heading guid="_6f9ee239-333b-487f-a214-2b959c09f670" id="sec.399-he">Hearing procedures</heading><subclause affected.by.uncommenced="0" guid="_cdac9e28-9cc6-42bb-a5ee-6131d2b61d2e" id="sec.399-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">In deciding an appeal, the Land Court—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d4c1da31-41ea-4c0f-af54-8591ce2b78e4" id="sec.399-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">has the same powers as the Minister; and</txt></block></li><li guid="_63bd36eb-ce96-4d70-9919-d5ddf0202d22" id="sec.399-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is not bound by the rules of evidence; and</txt></block></li><li guid="_6204050b-f311-4339-a17c-4c729eeb61ec" id="sec.399-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">must comply with natural justice; and</txt></block></li><li guid="_42a08ff2-3eac-4e9d-ba82-974d55c7d094" id="sec.399-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">may hear the appeal in court or in chambers.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8366e7f1-d2a8-4e3d-998a-ab762204d1dc" id="sec.399-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An appeal is by way of rehearing unaffected by the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2075a4fc-83d2-4ff9-aac8-07527f191edf" id="sec.399-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.399-ssec.1" target.guid="_cdac9e28-9cc6-42bb-a5ee-6131d2b61d2e">subsections (1)</intref> and <intref check="valid" refid="sec.399-ssec.2" target.guid="_8366e7f1-d2a8-4e3d-998a-ab762204d1dc">(2)</intref>, the procedure for the appeal is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8ccab17e-f417-4d9f-8176-63c4697035e4" id="sec.399-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in accordance with the rules for the Land Court; or</txt></block></li><li guid="_a20eb97a-6d66-41ae-b11e-5bc6dfe7802e" id="sec.399-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">in the absence of relevant rules, as directed by the Land Court.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e18f4a92-30b9-49d3-b06c-5337b607c9de" id="sec.399-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A power under an Act to make rules for the Land Court includes power to make rules for appeals under this part.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_579452ac-b6c8-434d-82cc-4ec6d60b4c3d" id="sec.400" provision.type="other" spent.amends="0"><no>400</no><heading guid="_ed07122d-c1ba-4972-9421-7325914e9e32" id="sec.400-he">Land Court’s powers on appeal</heading><subclause affected.by.uncommenced="0" guid="_4de5daef-2854-40da-a91a-b24944cfa3c8" id="sec.400-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.401" target.guid="_1fb0a7e3-7df8-4cf3-9c64-9f6e0c5e0db7">section 401</intref>, in deciding an appeal the Land Court may—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1eec6d7d-a6b3-4310-a446-e39c1712e9a1" id="sec.400-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">confirm the decision; or</txt></block></li><li guid="_39f50f12-949d-4cf8-a5d0-8487ad4133b7" id="sec.400-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">set aside the decision and substitute another decision; or</txt></block></li><li guid="_3295c86b-ffcb-4eeb-ba77-0b7ddb210fe8" id="sec.400-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">set aside the decision and return the issue to the Minister with the directions the Land Court considers appropriate.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f1054db7-fd88-4779-ad01-6256c71f515e" id="sec.400-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the Land Court substitutes another decision, the substituted decision is for this Act other than this part taken to be the decision of the Minister.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1fb0a7e3-7df8-4cf3-9c64-9f6e0c5e0db7" id="sec.401" provision.type="other" spent.amends="0"><no>401</no><heading guid="_babc852e-ea4e-469a-a1ec-a10ece423935" id="sec.401-he">Restriction on Land Court’s powers for decision not to grant GHG lease</heading><subclause affected.by.uncommenced="0" guid="_5eaa8112-4843-4aa1-b653-06221c4d048a" id="sec.401-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the Land Court is deciding an appeal against a decision not to grant a GHG lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_70c6da35-9cd8-45b2-a6b6-35c66336fad6" id="sec.401-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Land Court can not exercise a power mentioned in <intref check="valid" refid="sec.400" target.guid="_579452ac-b6c8-434d-82cc-4ec6d60b4c3d">section 400</intref><intref check="valid" refid="sec.400-ssec.1" target.guid="_4de5daef-2854-40da-a91a-b24944cfa3c8">(1)</intref><intref check="valid" refid="sec.400-ssec.1-para1.b" target.guid="_39f50f12-949d-4cf8-a5d0-8487ad4133b7">(b)</intref> or <intref check="valid" refid="sec.400-ssec.1-para1.c" target.guid="_3295c86b-ffcb-4eeb-ba77-0b7ddb210fe8">(c)</intref> in relation to the decision on the ground that any resource management decision for the application for the GHG lease was to give overlapping authority priority, in whole or part.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_b21628b7-f5b6-4248-8b5a-4aeb7013580f" id="ch.6-pt.4"><no>Part 4</no><heading guid="_31ea163c-97cb-45ae-8d7f-6084480a44d0" id="ch.6-pt.4-he">Evidence and legal proceedings</heading><division affected.by.uncommenced="0" guid="_747d07ce-0a74-420b-9379-d05c04b7f77d" id="ch.6-pt.4-div.1"><no>Division 1</no><heading guid="_f5709042-2572-4f59-8be9-5fc7f48db478" id="ch.6-pt.4-div.1-he">Evidentiary provisions</heading><clause affected.by.uncommenced="0" guid="_338948f9-5b50-4493-94f9-73bc21eebfac" id="sec.403" provision.type="other" spent.amends="0"><no>403</no><heading guid="_6e14d434-5ea5-44ba-8852-d050839e6f2f" id="sec.403-he">Application of <intref check="valid" refid="ch.6-pt.4-div.1" target.guid="_747d07ce-0a74-420b-9379-d05c04b7f77d">div 1</intref></heading><block><txt break.before="1">This division applies to a proceeding under or in relation to this Act.</txt></block></clause><clause affected.by.uncommenced="0" guid="_d566d3fb-c390-43be-a54c-d1e1591ebbf3" id="sec.404" provision.type="other" spent.amends="0"><no>404</no><heading guid="_2ae3c9fe-0b0d-42af-ad2e-5b64f867c8bb" id="sec.404-he">Authority</heading><block><txt break.before="1">The power of the Minister or chief executive to do anything under this Act must be presumed unless a party to the proceeding, by reasonable notice, requires proof of it.</txt></block></clause><clause affected.by.uncommenced="0" guid="_b1abd037-71f9-4af4-b3f2-c18b97abe9e5" id="sec.405" provision.type="other" spent.amends="0"><no>405</no><heading guid="_ace362ed-4ea5-4074-8fd6-1e2593860e5d" id="sec.405-he">Signatures</heading><block><txt break.before="1">A signature purporting to be the signature of the Minister or the chief executive is evidence of the signature it purports to be.</txt></block></clause><clause affected.by.uncommenced="0" guid="_ee846497-c49c-4200-8f27-836e70ee7ce7" id="sec.406" provision.type="other" spent.amends="0"><no>406</no><heading guid="_126def12-cce9-431a-957e-73d59a9741d0" id="sec.406-he">Other evidentiary aids</heading><block><txt break.before="1">A certificate purporting to be signed by the chief executive stating any of the following matters is evidence of the matter—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_930a206b-57f0-4405-b981-00de9d048558" id="sec.406-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that a stated document of any of the following types is a document given, issued, kept or made under this Act—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_972785e8-883a-422c-9edf-1e33f5d6be10" id="sec.406-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">an appointment, approval or decision;</txt></block></li><li guid="_c6cc8546-72a2-4f2c-861d-c9772c6929d8" id="sec.406-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a direction, notice or requirement;</txt></block></li><li guid="_fc2d9f34-5cf7-4a19-950c-f54e92e2613b" id="sec.406-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">a GHG authority;</txt></block></li><li guid="_eff2f7f1-3a35-4654-861a-b68c14db65ee" id="sec.406-para1.a-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">a report;</txt></block></li><li guid="_0c38dc0c-909c-483c-bfad-e20318eb1e81" id="sec.406-para1.a-para2.vi" provision.type="other"><no>(vi)</no><block><txt break.before="0">another record;</txt></block></li></list></block></li><li guid="_cb145592-6304-4ecf-81f7-edeb876baf37" id="sec.406-para1.aa" provision.type="other"><no>(aa)</no><block><txt break.before="0">that a stated document is a register kept under the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>;</txt></block></li><li guid="_e2665a69-56dc-461a-b731-1318eb30d08c" id="sec.406-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that a stated document is another document kept under this Act;</txt></block></li><li guid="_72146a21-3940-4570-842c-fa91f253f49d" id="sec.406-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that a stated document is a copy of, or an extract from or part of, a thing mentioned in <intref check="valid" refid="sec.406-para1.a" target.guid="_930a206b-57f0-4405-b981-00de9d048558">paragraph (a)</intref> or <intref check="valid" refid="sec.406-para1.b" target.guid="_e2665a69-56dc-461a-b731-1318eb30d08c">(b)</intref>;</txt></block></li><li guid="_bfeda13a-5749-4db3-a90a-4dcf9c04b187" id="sec.406-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">that on a stated day—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9ca1fa25-2d6a-4200-9307-4354702f8f84" id="sec.406-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a stated person was given a stated decision, direction or notice under this Act; or</txt></block></li><li guid="_2a280c94-dfef-463f-98ce-64b2918e0519" id="sec.406-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a stated requirement under this Act was made of a stated person;</txt></block></li></list></block></li><li guid="_ab78246b-bc4a-4a6f-ba22-11f7717d9b6b" id="sec.406-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">that on a stated day or during a stated period a GHG authority—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9c675946-2d93-4820-b342-bcd3cd0f0747" id="sec.406-para1.e-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">was or was not in force; or</txt></block></li><li guid="_596399ba-6be8-40a9-9a43-63bdf069686a" id="sec.406-para1.e-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">was or was not subject to a stated condition; or</txt></block></li><li guid="_a494b7a4-c567-4c6a-b6bf-7508855ad7de" id="sec.406-para1.e-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">was or was not cancelled;</txt></block></li></list></block></li><li guid="_7b219390-fbdc-42bd-9d77-eac046552bf2" id="sec.406-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">that a stated amount is payable under this Act by a stated person and has not been paid;</txt></block></li><li guid="_bbe98a13-95a2-4844-9f35-1e32f4cfaeea" id="sec.406-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">that a stated address for the holder of a GHG authority is the last address of the holder known to the Minister or the chief executive.</txt></block></li></list></block></clause></division><division affected.by.uncommenced="0" guid="_43280823-74b1-4163-b29a-17d1dcec348c" id="ch.6-pt.4-div.2"><no>Division 2</no><heading guid="_8eed5050-cf7b-4caa-ba6b-2349e4396bb8" id="ch.6-pt.4-div.2-he">Offence proceedings</heading><clause affected.by.uncommenced="0" guid="_e1a63d15-7e93-4364-b6d8-ed8a32308caf" id="sec.407" provision.type="other" spent.amends="0"><no>407</no><heading guid="_90b503b2-0070-4312-8d65-a23aab010f9b" id="sec.407-he">Offences under Act are summary</heading><subclause affected.by.uncommenced="0" guid="_466e4af6-a223-4403-a964-844d06ebc00b" id="sec.407-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An offence against this Act is a summary offence.</txt></block></subclause><subclause affected.by.uncommenced="0" change="delReplace" guid="_eac3718a-8a37-47ef-8648-a3decfdc955b-del" id="sec.407-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">A proceeding for an offence against this Act must start within the later of the following periods to end—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_03a0813c-a30c-496d-b255-6090e98860ef-del" id="sec.407-ssec.2-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">1 year after the commission of the offence;</txt></block></li><li guid="_f1c4093b-db2f-43d7-af02-41027aa758a8-del" id="sec.407-ssec.2-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">6 months after the offence comes to the complainant’s knowledge but within 2 years after the commission of the offence.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" change="insReplace" guid="_7029ea24-f792-47e5-951e-bd417fe9ec95" id="sec.407-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A proceeding for an offence against this Act must be started within—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_73cd4ab2-741c-471b-a1bc-6911ed286c47" id="sec.407-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">1 year after the commission of the offence; or</txt></block></li><li guid="_52f306e4-6920-444b-a9ee-1de58ea87f66" id="sec.407-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">1 year after the offence comes to the complainant’s knowledge, but within 2 years after the commission of the offence.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7200870a-85bc-418a-ad23-0bfd4a8257b7" id="sec.408" provision.type="other" spent.amends="0"><no>408</no><heading guid="_ab827d1d-610b-4bd1-9cef-64c6764a17e4" id="sec.408-he">Statement of complainant’s knowledge</heading><block><txt break.before="1">In a complaint starting a proceeding for an offence against this Act, a statement that the matter of the complaint came to the complainant’s knowledge on a stated day is evidence the matter came to the complainant’s knowledge on that day.</txt></block></clause><clause affected.by.uncommenced="0" guid="_3e1c999c-2f7f-4c76-8f57-47eb16086f7d" id="sec.409" provision.type="other" spent.amends="0"><no>409</no><heading guid="_8abb70dc-2076-4f06-8660-35920ecbdb48" id="sec.409-he">Conduct of representatives</heading><subclause affected.by.uncommenced="0" guid="_121faa17-8f6f-4e2c-b859-dc0831dee26a" id="sec.409-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to a proceeding for an offence against this Act if it is relevant to prove a person’s state of mind about particular conduct.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b9984156-6479-47b7-810c-74f22d99ad53" id="sec.409-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">It is enough to show—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a553b9c9-e2cd-40cb-96e7-00558c0f0107" id="sec.409-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the conduct was engaged in by a representative of the person within the scope of the representative’s actual or apparent authority; and</txt></block></li><li guid="_facd58d1-70a1-44ae-9680-095341b4c0e3" id="sec.409-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the representative had the state of mind.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1540f19b-c6b9-4351-a8c7-62c065b758a6" id="sec.409-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Conduct engaged in for a person by a representative of the person within the scope of the representative’s actual or apparent authority is taken to have been engaged in also by the person unless the person proves—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c477cbad-44a0-4e7b-baac-f849399ee100" id="sec.409-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the person was in a position to influence the representative in relation to the conduct—the person took reasonable steps to prevent the conduct; or</txt></block></li><li guid="_0104c2c5-fefa-4da9-8900-4c3993e14ea4" id="sec.409-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the person was not in a position to influence the representative in relation to the conduct.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5afb782c-50b2-4048-9362-de551c342835" id="sec.409-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_8531f53e-586e-487b-8371-e10aa8c8a6a4" id="sec.409-ssec.4-def.engaging_"><txt break.before="1"><defterm guid="_4b4468ab-940c-4c50-83ed-69aabc1d347d" id="sec.409-ssec.4-def.engaging" type="definition">engaging</defterm> in conduct includes failing to engage in conduct.</txt></definition><definition affected.by.uncommenced="0" guid="_5cfa236b-52d8-4248-bf17-b66b8562423d" id="sec.409-ssec.4-def.representative_"><txt break.before="1"><defterm guid="_9899e2cf-82b7-4d73-a488-df22e0f4d63a" id="sec.409-ssec.4-def.representative" type="definition">representative</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_97c3b5f2-7a85-46ce-95ec-c3dd442b653e" id="sec.409-ssec.4-def.representative-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for a corporation—an agent, employee or executive officer of the corporation; or</txt></block></li><li guid="_79ffd732-5389-4ddc-81ec-609aba007a4f" id="sec.409-ssec.4-def.representative-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for an individual—an agent or employee of the individual.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_2ce69118-9b5f-4d68-b7d1-03cdc5795905" id="sec.409-ssec.4-def.stateofmind_"><txt break.before="1"><defterm guid="_3b4cc658-a017-4593-bf43-a44bec1c9f08" id="sec.409-ssec.4-def.stateofmind" type="definition">state of mind</defterm>, of a person, includes the person’s—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c02f38b5-d761-409c-843b-863a5c2e6ff7" id="sec.409-ssec.4-def.stateofmind-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">belief, intention, knowledge, opinion or purpose; and</txt></block></li><li guid="_9e76ad43-f3c4-4a8a-9546-6f524c7dc1e9" id="sec.409-ssec.4-def.stateofmind-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">reasons for the belief, intention, opinion or purpose.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1162dc2b-61b0-45c6-b187-39859b3587b7" id="sec.410" provision.type="other" spent.amends="0"><no>410</no><heading guid="_164dfadb-c648-4523-a9c2-5acbc68f91dc" id="sec.410-he">Additional orders that may be made on conviction</heading><subclause affected.by.uncommenced="0" guid="_8f986e7c-5c06-4cda-8deb-04dfb1907548" id="sec.410-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a court convicts a person for an offence against this Act, it may—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bc2c7fbf-41d7-4635-ab44-0d68459ca0e2" id="sec.410-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">order the forfeiture to the State of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b3b8c529-9052-4830-ab23-400f9ffdeb54" id="sec.410-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">anything used to commit the offence; or</txt></block></li><li guid="_a76edf55-95e6-4aaa-88ee-4ad1ab3dd70d" id="sec.410-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">anything else the subject of the offence; and</txt></block></li></list></block></li><li guid="_f8d9b9d7-1b27-4e5c-a446-3407d3fdbf61" id="sec.410-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">make any order to enforce the forfeiture it considers appropriate; and</txt></block></li><li guid="_ca025042-f7d6-40b7-8ab2-57942c4dc7f9" id="sec.410-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">order the person to pay the State the amount of costs it incurred for remedial work that was necessary or desirable because of the commission of the offence.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_75ebb55e-cacb-446b-b8b5-10ea8b82c69e" id="sec.410-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Forfeiture of a thing may be ordered—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d3746aff-2208-474f-b802-f45a63805c4f" id="sec.410-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">whether or not it has been seized under this Act; and</txt></block></li><li guid="_adef975c-1ade-4167-89b0-da0ee59cd733" id="sec.410-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if it has been seized under this Act, whether or not it has been returned to its owner.</txt></block></li></list></block></subclause></clause></division></part></chapter><chapter affected.by.uncommenced="0" guid="_c71c8b11-e33d-4d92-93a5-6b36981ef2af" id="ch.7"><no>Chapter 7</no><heading guid="_a1722629-ffd4-4a50-8950-b9d24b5c5842" id="ch.7-he">Miscellaneous provisions</heading><part affected.by.uncommenced="0" guid="_52045836-8aa9-4370-bd20-28391b2a1028" id="ch.7-pt.1"><no>Part 1</no><heading guid="_71a75463-9e04-4561-bd82-9487481de310" id="ch.7-pt.1-he">Applications, lodging documents and making submissions</heading><clause affected.by.uncommenced="0" guid="_1563d9ac-bd31-449e-842a-931b0e660c2b" id="sec.411" provision.type="other" spent.amends="0"><no>411</no><heading guid="_08b4539f-f619-4817-bcbe-277fd43e91cb" id="sec.411-he">Place or way for making applications, lodging documents or making submissions</heading><subclause affected.by.uncommenced="0" guid="_d81b489c-d209-435a-9922-fbf8d2f7d189" id="sec.411-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to any of the following under this Act—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fc5cbbf4-c72c-4ced-9c39-d499485ba21c" id="sec.411-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the making of an application;</txt></block></li><li guid="_3e9e7585-a5c2-4031-aaf6-3475cba8e0bf" id="sec.411-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the giving of a document to the Minister or the chief executive;</txt></block></li><li guid="_9d53b170-2bf7-43a1-9b55-27910b136dd2" id="sec.411-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the making of a submission.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_fcd5e1c1-c159-4a2c-87a0-23a0acfcdc84" id="sec.411-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application, document or submission may be made or given only—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_65e985ba-fd30-4bec-9120-2c70d86ff1c3" id="sec.411-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">at the following place—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_abdc2f13-b5db-46ff-bca1-cefd4cbc83d9" id="sec.411-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the office of the department provided for under the relevant approved form for that purpose;</txt></block></li><li guid="_c387aa84-8349-4f90-bcea-d46fbe6e7079" id="sec.411-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the relevant approved form does not make provision as mentioned in <intref check="valid" refid="sec.411-ssec.2-para1.a-para2.i" target.guid="_abdc2f13-b5db-46ff-bca1-cefd4cbc83d9">subparagraph (i)</intref> or if there is no relevant approved form—the office of the department notified on the department’s website; or</txt></block></li></list></block></li><li guid="_75b4d2ac-1af7-420d-bcdb-44710dba0e50" id="sec.411-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">in the way prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2aa72ce5-e2a9-4105-9db0-31f04a588566" id="sec.411-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.411-ssec.2" target.guid="_fcd5e1c1-c159-4a2c-87a0-23a0acfcdc84">subsection (2)</intref><intref check="valid" refid="sec.411-ssec.2-para1.b" target.guid="_75b4d2ac-1af7-420d-bcdb-44710dba0e50">(b)</intref>, the way prescribed under a regulation may include making or giving the application, document or submission at another place.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1109b4f6-c9d7-4bde-9b7e-450cf22213e9" id="sec.411-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">This section does not apply to the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f794671f-0590-4860-aae3-8d1a6d18e3a5" id="sec.411-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the making of an application to the Land Court;</txt></block></li><li guid="_3dedca1f-02b3-4d09-b1f4-e8c25e72097f" id="sec.411-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the giving of a document that, under this Act, must be given in the required way for giving reports to the chief executive.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a2bee89d-aa09-4024-9bad-df3820f1183c" id="sec.412" provision.type="other" spent.amends="0"><no>412</no><heading guid="_b227748f-8a3a-469b-800f-c24f3208de6d" id="sec.412-he">Requirements for making an application</heading><subclause affected.by.uncommenced="0" guid="_6a80b656-9b59-483b-a2b8-f6e7e22764e6" id="sec.412-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister must refuse to receive or process a purported application, other than to the Land Court, not made under the requirements under this Act for making the application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bca8a027-dc83-48b1-9171-eee4b49ae522" id="sec.412-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the Minister may decide to allow the application to proceed and be decided as if it did comply with the requirements if the Minister is satisfied the application substantially complies with the requirements.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2faa195e-a98a-4e0c-8470-a46a03d85bed" id="sec.412-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the Minister decides to refuse to receive or process the purported application—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5ae7d4be-9103-4def-a62c-773624dce16e" id="sec.412-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the Minister must give the applicant written notice of the decision and the reasons for it; and</txt></block></li><li guid="_67b82dfe-b0dd-41a6-bf1d-763cf480d9c7" id="sec.412-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the chief executive must refund the application fee to the applicant.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_abfc625f-6455-41a7-be31-d4abf55df2a4" id="sec.413" provision.type="other" spent.amends="0"><no>413</no><heading guid="_eef55e22-8f52-408b-b403-cc059cc3fbf9" id="sec.413-he">Request to applicant about application</heading><subclause affected.by.uncommenced="0" guid="_f90c40f3-5e11-4d85-aeae-4d924c829f8f" id="sec.413-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">For an application under this Act, the chief executive may, by notice, require the applicant to do all or any of the following within a stated reasonable period—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ad81cee0-64a4-486c-94b6-38de22937e5c" id="sec.413-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">complete or correct the application if it appears to the chief executive to be incorrect, incomplete or defective;</txt></block></li><li guid="_793c226d-ca7b-45d8-9c42-b8ea2b240405" id="sec.413-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give the chief executive or a stated officer of the department additional information about, or relevant to, the application;</txt><note guid="_8c028403-e576-495a-868c-496cd5ebfac3" id="sec.413-ssec.1-para1.b-note" type="example"><heading guid="_b1996394-cf4e-4058-a477-aa6860d20081" id="sec.413-ssec.1-para1.b-note-he">Example—</heading><block><txt break.before="1">The application is for a GHG tenure. The chief executive may require a document, prepared by an appropriately qualified person, independently verifying geological or predictive migration data given in the proposed work program or development plan for the GHG tenure.</txt></block></note></block></li><li guid="_d4807150-d7f6-4bdb-bdfc-e0124327f599" id="sec.413-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">give the chief executive or a stated officer of the department an independent report by an appropriately qualified person, or a statement or statutory declaration, verifying all or any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_601806ec-2113-4284-97a1-c86b1a01d7fe" id="sec.413-ssec.1-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">any information included in the application;</txt></block></li><li guid="_e447ed2a-b878-400d-afd3-02412e99d962" id="sec.413-ssec.1-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">any additional information required under <intref check="valid" refid="sec.413-ssec.1-para1.b" target.guid="_793c226d-ca7b-45d8-9c42-b8ea2b240405">paragraph (b)</intref>;</txt></block></li><li guid="_ba36b7ac-cc0c-4719-8f97-634a1a60648e" id="sec.413-ssec.1-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">if the application is for a GHG tenure—that the applicant meets the relevant capability criteria under <intref check="valid" refid="ch.2" target.guid="_60f42d8e-8fdb-4c76-a1e6-d0c7ad27b9d4">chapter 2</intref> or <intref check="valid" refid="ch.3" target.guid="_4c6bae05-4d64-4dbf-a4f3-a2736db63437">3</intref>.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_cef431c2-cfc4-44d7-898d-250ed945516f" id="sec.413-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.413-ssec.1" target.guid="_f90c40f3-5e11-4d85-aeae-4d924c829f8f">subsection (1)</intref><intref check="valid" refid="sec.413-ssec.1-para1.b" target.guid="_793c226d-ca7b-45d8-9c42-b8ea2b240405">(b)</intref>, if the application is for a GHG authority, a required document may include a survey or resurvey of the area of the proposed authority carried out by a person who is a cadastral surveyor under the <legref check="valid" jurisd="QLD" target.doc.id="act-2003-070" target.version.series="58bf4472-9a2d-4809-9f04-c4ff625373da" type="act"><name emphasis="yes">Surveyors Act 2003</name></legref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c897fe23-9508-49d2-b7dd-47c07fbe90a6" id="sec.413-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For <intref check="valid" refid="sec.413-ssec.1" target.guid="_f90c40f3-5e11-4d85-aeae-4d924c829f8f">subsection (1)</intref><intref check="valid" refid="sec.413-ssec.1-para1.c" target.guid="_d4807150-d7f6-4bdb-bdfc-e0124327f599">(c)</intref>, the notice may require the statement or statutory declaration—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_137c4b63-413a-441c-aa4b-26e37035b9cd" id="sec.413-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to be made by an appropriately qualified independent person or by the applicant; and</txt></block></li><li guid="_9d155fad-139a-4c66-8446-232f06a0db0f" id="sec.413-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the applicant is a corporation—to be made for the applicant by an executive officer of the applicant.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1ef2b96e-29c9-40b6-8f35-9956a92a4a4a" id="sec.413-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The giving of a statement for <intref check="valid" refid="sec.413-ssec.1" target.guid="_f90c40f3-5e11-4d85-aeae-4d924c829f8f">subsection (1)</intref><intref check="valid" refid="sec.413-ssec.1-para1.c" target.guid="_d4807150-d7f6-4bdb-bdfc-e0124327f599">(c)</intref> does not prevent the chief executive from also requiring a statutory declaration for the subsection.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d696e13c-a33d-4578-bcaf-d5989f8198ad" id="sec.413-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The applicant must bear any costs incurred in complying with the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_208152de-75ad-42f3-aac2-5846be789d00" id="sec.413-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The chief executive may extend the period for complying with the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_218e2ad7-bbd4-4007-b0d6-93fbec5c9127" id="sec.413-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_6fdf5db5-227e-49da-ad26-5a198237ab98" id="sec.413-ssec.7-def.application_"><txt break.before="1"><defterm guid="_96280ec3-1323-42ca-ac89-827ffcb88e24" id="sec.413-ssec.7-def.application" type="definition">application </defterm>does not include an application to the Land Court.</txt></definition><definition affected.by.uncommenced="0" guid="_889e38d0-1a36-46be-9722-c07f6b35666f" id="sec.413-ssec.7-def.information_"><txt break.before="1"><defterm guid="_e4747a35-681b-4435-8976-451e848f4db6" id="sec.413-ssec.7-def.information" type="definition">information</defterm> includes a document.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c37e27ab-8e7a-4296-b2d3-b7e8a1239c71" id="sec.413A" provision.type="other" spent.amends="0"><no>413A</no><heading guid="_c7d5a30a-c0aa-496e-a9a2-7b5511fe2e02" id="sec.413A-he">Refusing application for failure to comply with request</heading><block><txt break.before="1">The Minister may refuse an application if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a34a42ce-6f7d-48a2-8c07-2a14d3813046" id="sec.413A-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a notice under <intref check="valid" refid="sec.413" target.guid="_abfc625f-6455-41a7-be31-d4abf55df2a4">section 413</intref> has been given for the application; and</txt></block></li><li guid="_348485e8-2ae1-4531-b278-ef97300dee8c" id="sec.413A-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the period stated in the notice for complying with it has ended; and</txt></block></li><li guid="_4d368fba-379f-4581-8e7e-8ae8480a6ae7" id="sec.413A-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the request has not been complied with to the chief executive’s satisfaction.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_a3811b19-6849-4d7c-990f-198e62c00f9f" id="sec.413B" provision.type="other" spent.amends="0"><no>413B</no><heading guid="_3c7e5b6c-a0d8-4271-a43a-1228917a3ab1" id="sec.413B-he">Notice to progress GHG authority or renewal application</heading><subclause affected.by.uncommenced="0" guid="_34ac6edd-1bd4-48c8-90a4-22a29a62b29e" id="sec.413B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may by notice require an applicant for, or to renew, a GHG authority to, within a stated reasonable period, do any thing required of the applicant under this Act or another Act to allow the application to be decided or the authority to be granted or renewed.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a9b16c4a-5895-42d0-b2b7-0c5c85790309" id="sec.413B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the period for complying with the notice must be at least 20 business days after the notice is given.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0f119db1-9db2-4f12-9dc9-f845138cde6c" id="sec.413B-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister may extend the period for complying with the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fce5a131-7b4e-4344-bace-2819af760935" id="sec.413B-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The Minister may refuse the application if the applicant does not comply with the requirement.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f6d41847-5b0f-4571-b662-8e9b9db8b500" id="sec.414" provision.type="other" spent.amends="0"><no>414</no><heading guid="_1195d5d9-0515-41b9-9c86-44b5c4413a62" id="sec.414-he">Particular criteria generally not exhaustive</heading><subclause affected.by.uncommenced="0" guid="_c112531f-1c88-4d29-b608-94a8a61ccd0c" id="sec.414-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if another provision of this Act permits or requires the Minister to consider particular criteria in deciding an application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_28ec2038-d022-4d21-9b20-8e4986a2be34" id="sec.414-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">To remove any doubt, it is declared that the Minister may in making the decision consider any other criteria the Minister considers relevant.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_433e3969-fcc2-4b06-b780-6cb2570a7ae6" id="sec.414-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.414-ssec.2" target.guid="_28ec2038-d022-4d21-9b20-8e4986a2be34">subsection (2)</intref> does not apply if the provision otherwise provides.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6817ed8f-b4a3-4ee7-b4a2-b0d5ba7e817e" id="sec.414-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_10b86403-8b52-41de-882c-4fe9e2d73128" id="sec.414-ssec.4-def.criteria_"><txt break.before="1"><defterm guid="_ab3c4f26-7d5b-4891-9cf8-778a14efa783" id="sec.414-ssec.4-def.criteria" type="definition">criteria</defterm> includes issues and matters.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_30ab0a07-f922-494c-93f3-2c7c97838f5f" id="sec.415" provision.type="other" spent.amends="0"><no>415</no><heading guid="_efe8dc82-0ad3-4989-a24c-11dda3c3b1d2" id="sec.415-he">Particular grounds for refusal generally not exhaustive</heading><subclause affected.by.uncommenced="0" guid="_5c082403-8226-4eb2-b944-9da79c9a6ca4" id="sec.415-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if another provision of this Act provides for particular grounds on which the Minister may refuse an application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1cb66e84-4007-4bcf-80e0-a4b1b519e49e" id="sec.415-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">To remove any doubt, unless the other provision otherwise provides, the person may refuse the application on another reasonable and relevant ground.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_87bbfc5c-fb99-4567-9bbb-8d6be77b548d" id="sec.415-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_b842e49c-dfac-47ff-9609-c73af246d4d6" id="sec.415-ssec.3-def.refuse_"><txt break.before="1"><defterm guid="_6f93611a-a8e7-41f6-aacd-722faae34bc7" id="sec.415-ssec.3-def.refuse" type="definition">refuse</defterm>, an application, includes to refuse the thing the subject of the application.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_452a50de-45ce-49b7-91a8-f55ddfa427ad" id="sec.416" provision.type="other" spent.amends="0"><no>416</no><heading guid="_bbcf6082-ce73-45e9-801d-79ed205ca60b" id="sec.416-he">Amending applications</heading><subclause affected.by.uncommenced="0" guid="_f54b4d27-4a66-4feb-8355-343df249aa0d" id="sec.416-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a person has made an application under this Act, the person may amend the application or a document accompanying the application only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a54ae77d-521b-442b-9961-5b83fe89c368" id="sec.416-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the application has not been decided; and</txt></block></li><li guid="_cc5a8399-fd2d-41e0-9f8a-2545c7d7682c" id="sec.416-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Minister has agreed to the making of the amendment; and</txt></block></li><li guid="_2af327a5-d031-44c1-b236-1bb575d886ba" id="sec.416-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the proposed amendment is to change the applicant—each applicant and proposed applicant has agreed to the change; and</txt></block></li><li guid="_ceac0492-36ea-44e2-9f2f-3700f30fe3dc" id="sec.416-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the person has paid any fee prescribed by regulation for the amendment.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_58f5e0ef-cd4e-417f-a8f4-843a7f827f44" id="sec.416-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if the application is a tender for a GHG tenure—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a68882d6-497c-48f7-be87-26e3d89aae9f" id="sec.416-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a proposed work program or development plan included in the tender can not be amended after the applicant has become the preferred tenderer for the tender; and</txt></block></li><li guid="_bd7d3d7a-7908-4301-b213-66c9ead31ff0" id="sec.416-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the tender can not be otherwise amended after the closing time for the relevant call for tenders.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2d92212c-e8e1-4de2-bc1a-5ce25c6bcf1d" id="sec.416-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.416-ssec.2" target.guid="_58f5e0ef-cd4e-417f-a8f4-843a7f827f44">subsection (2)</intref><intref check="valid" refid="sec.416-ssec.2-para1.b" target.guid="_bd7d3d7a-7908-4301-b213-66c9ead31ff0">(b)</intref> does not apply if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3e034239-8614-4519-aeb1-598f47ddc1a2" id="sec.416-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the tenderer is a corporation; and</txt></block></li><li guid="_5b2d5354-a37f-4446-a4cf-29c03814fda5" id="sec.416-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the change is only a change of name of the tenderer; and</txt></block></li><li guid="_86afa344-2bb2-497e-bbce-0cb676ca15bc" id="sec.416-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the tenderer’s Australian company number and Australian registered business name have not changed.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5cf69e43-5f76-41d5-bfec-d7759ef8dbdd" id="sec.416-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If under <intref check="valid" refid="sec.416-ssec.1" target.guid="_f54b4d27-4a66-4feb-8355-343df249aa0d">subsection (1)</intref>, the application is amended to change the applicant, for the deciding of the application the applicant as changed is taken to have been the applicant from the making of the application.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_53b6328f-b4df-4aba-ad88-7df56fcc43f5" id="sec.417" provision.type="other" spent.amends="0"><no>417</no><heading guid="_58482130-e3b8-483f-8774-c668d3bf510d" id="sec.417-he">Withdrawal of application</heading><subclause affected.by.uncommenced="0" guid="_a02f09bb-5aa5-4829-a801-34bcdd09b931" id="sec.417-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person who has made an application under this Act may give the chief executive a notice withdrawing the application at any time before any decision about the application takes effect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f6f76814-a0e4-4c17-bf2e-d341939e46a8" id="sec.417-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The withdrawal takes effect when the notice is given.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_34ea2d83-be66-4b4c-88e5-1fe2c04ee410" id="sec.417-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the applicant is a preferred tenderer for a call for tenders, the withdrawal does not affect the Minister’s power to appoint another tenderer from the tenders made in response to the call to be the preferred tenderer.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f64cbaf1-ab07-4ab3-b9c8-6489e53f24ba" id="sec.418" provision.type="other" spent.amends="0"><no>418</no><heading guid="_17379189-cd36-4ad1-9053-8c57b48e61f2" id="sec.418-he">Minister’s power to refund application fee</heading><block><txt break.before="1">If an application under this Act is withdrawn, the Minister may refund all or part of any fee paid for the application.</txt></block></clause></part><part affected.by.uncommenced="0" guid="_0ad1ba37-541a-4d4c-b1cc-6ce2a0e62c24" id="ch.7-pt.2"><no>Part 2</no><heading guid="_dfebdda3-3953-46f2-8892-c6d5058695df" id="ch.7-pt.2-he">Other miscellaneous provisions</heading><clause affected.by.uncommenced="0" guid="_2728f934-95a7-40d1-a2ce-8f51e6a5b2f6" id="sec.419" provision.type="other" spent.amends="0"><no>419</no><heading guid="_ca09109a-5409-49dc-99c7-1ee1fca0b961" id="sec.419-he">General public interest criteria for ministerial decisions</heading><subclause affected.by.uncommenced="0" guid="_a49ac134-f1b2-480d-a519-766b248894e8" id="sec.419-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister must consider the public interest in making a decision under this Act about an application or the granting of an approval by the Minister.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_759cc8d6-b4ed-49d6-981b-4938d7c8acc6" id="sec.419-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_be63e249-875c-4e40-8be2-ed631f75200b" id="sec.419-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">another provision of this Act permits or requires the Minister to make a decision; and</txt></block></li><li guid="_c184ec24-3ff1-4eda-968c-5a2fc1e0a632" id="sec.419-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the other provision does not require the Minister to consider the public interest;</txt></block></li></list></block><block><txt break.before="1">the Minister may nonetheless consider the public interest in making the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0ce806ac-cb36-4dbc-b5bd-f8ef9441220b" id="sec.420" provision.type="other" spent.amends="0"><no>420</no><heading guid="_2be4dbfa-486c-4e6f-911a-218896c4ce37" id="sec.420-he">Provision for entry by State to carry out GHG storage activity</heading><subclause affected.by.uncommenced="0" guid="_c0db8a92-1c4f-43e7-9d38-10594d4fc012" id="sec.420-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the State proposes to exercise a right under <intref check="valid" refid="sec.28" target.guid="_4a2fd518-2bd5-4575-8669-5a7e9bf4741f">section 28</intref><intref check="valid" refid="sec.28-ssec.3" target.guid="_70ae06e9-79fa-44d9-b5dc-18511b946448">(3)</intref><intref check="valid" refid="sec.28-ssec.3-para1.b" target.guid="_bb57fc90-1c16-4a14-95e1-2d00662caee9">(b)</intref><intref check="valid" refid="sec.28-ssec.3-para1.b-para2.i" target.guid="_045843a4-6048-498b-b4dc-af9c55dc11dd">(i)</intref>, the right may be exercised by anyone authorised by the chief executive.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5c19fc44-6b64-4bc9-bef5-8c95d19ab62e" id="sec.420-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, a person authorised under <intref check="valid" refid="sec.420-ssec.1" target.guid="_c0db8a92-1c4f-43e7-9d38-10594d4fc012">subsection (1)</intref> may enter the land only if the person has given the owner of the land at least 5 business days notice of the proposed entry.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5195cbc3-7232-474a-bec6-85274af68b4c" id="sec.420-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">To remove any doubt, it is declared that <intref check="valid" refid="sec.420-ssec.2" target.guid="_5c19fc44-6b64-4bc9-bef5-8c95d19ab62e">subsection (2)</intref> does not apply to an inspector or authorised officer under the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref> performing functions under that Act relating to this Act.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d6eba455-d8cd-47ae-94eb-44331bc8d45f" id="sec.421" provision.type="other" spent.amends="0"><no>421</no><heading guid="_857e9f8f-13e6-4ac3-a1de-1bda37918f32" id="sec.421-he">Name and address for service</heading><subclause affected.by.uncommenced="0" guid="_a2f1cf5a-d101-4d94-8aa7-40242c42df76" id="sec.421-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person (the <defterm guid="_b164bc80-2d2f-467f-885f-647f48a5191d" id="sec.421-def.firstperson" type="definition">first person</defterm>) may by a signed notice given to the chief executive nominate another person (a <defterm guid="_65142bca-5139-4146-8bf9-a58c625da404" id="sec.421-def.nominatedperson" type="definition">nominated person</defterm>) at a stated address as the first person’s address for service for this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_49862e4e-0bf4-44f8-8ea0-8a98f3525533" id="sec.421-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If this Act requires or permits the Minister or chief executive to serve a notice or other document on the first person, it may be served on the first person by serving it on the last nominated person at the stated address for that person.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6cbce09a-a486-42b8-adcd-da1caea8daf0" id="sec.421-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_5726cce7-052c-4011-9874-b2e62a1550d2" id="sec.421-ssec.3-def.serve_"><txt break.before="1"><defterm guid="_31af61ba-b499-42cd-978c-3e93b088e864" id="sec.421-ssec.3-def.serve" type="definition">serve</defterm> includes give.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b742ab3e-700f-48ec-963a-073b684579a0" id="sec.422" provision.type="other" spent.amends="0"><no>422</no><heading guid="_5840f3b6-ce78-42c2-9c46-e91dc88fa31e" id="sec.422-he">Additional information about reports and other matters</heading><subclause affected.by.uncommenced="0" guid="_288627ce-ac25-4858-9781-433ba2be1b82" id="sec.422-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_deec3954-a719-4e0d-8ed6-f31eba3e73c0" id="sec.422-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a person is required under this Act to give a notice or copy of a document, report or information (the <defterm guid="_b9d5069a-91e8-4935-a12e-76afa65e759c" id="sec.422-ssec.1-def.advice" type="definition">advice</defterm>) with the Minister or the chief executive; and</txt></block></li><li guid="_1bb95157-2fdb-4ec2-8e1a-3f8f6c365dbc" id="sec.422-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the person gives the advice.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_75701666-4f4b-4e5b-b05f-0d4526f12f06" id="sec.422-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister or chief executive may by notice require the person to give within the reasonable time stated in the notice written information about the matter for which the advice was given.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d7b914f1-1546-4f0e-a3b1-79a0463d358f" id="sec.422-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The person must comply with the notice.</txt></block><penalty guid="_8762ef22-2f94-4c1c-ab0a-9400a0ce8a19" id="sec.422-ssec.3-pen"><block><txt break.before="1">Maximum penalty for <intref check="valid" refid="sec.422-ssec.3" target.guid="_d7b914f1-1546-4f0e-a3b1-79a0463d358f">subsection (3)</intref>—500 penalty units.</txt></block></penalty></subclause></clause><clause affected.by.uncommenced="0" guid="_bb9b1ae6-75de-4215-ac5c-3ff3a42f2910" id="sec.423" provision.type="other" spent.amends="0"><no>423</no><heading guid="_392e6d3f-dcc7-4d32-b0bb-87a1e63298c2" id="sec.423-he">References to right to enter</heading><block><txt break.before="1">A right under this Act to enter a place includes the right to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e976bae8-5eb0-4c54-9e81-6bce663b1bc2" id="sec.423-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">leave and re-enter the place from time to time; and</txt></block></li><li guid="_fcceb5f2-4da7-4510-8125-669b77c67e04" id="sec.423-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">remain on the place for the time necessary to achieve the purpose of the entry; and</txt></block></li><li guid="_2233576d-5d8b-47e9-b746-4a988630a99d" id="sec.423-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">take on the place equipment, materials, vehicles or other things reasonably necessary to exercise a power under this Act.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_576e1331-0f04-4ed9-b2e5-0e50e0f71170" id="sec.424" provision.type="other" spent.amends="0"><no>424</no><heading guid="_9387046c-4872-4cc6-82a1-fc3af11acdeb" id="sec.424-he">Application of provisions</heading><block><txt break.before="1">If a provision of this Act applies any of the following (the <defterm guid="_606ea4a6-efcc-4716-a268-2539569e8f9f" id="def.appliedlaw" type="definition">applied law</defterm>) for a purpose—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_626387cb-2de1-4d56-9708-b39af1df86c2" id="sec.424-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">another provision of this Act;</txt></block></li><li guid="_7e49bba0-ee8c-4119-a1db-26d273ad41dd" id="sec.424-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">another law;</txt></block></li><li guid="_ea250f23-3f9e-4ad6-a30b-864b7bfb9546" id="sec.424-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a provision of another law;</txt></block></li></list></block><block><txt break.before="1">for that purpose the applied law and any definition relevant to it apply with necessary changes.</txt></block></clause><clause affected.by.uncommenced="0" guid="_50bbaecc-2419-452c-a599-17f38f0af193" id="sec.425" provision.type="other" spent.amends="0"><no>425</no><heading guid="_00285641-f165-4cfc-9af7-50e72c0cb000" id="sec.425-he">Protection from liability for particular persons</heading><subclause affected.by.uncommenced="0" guid="_7ba11e7a-ff71-4e50-90f5-ec635f50f4a0" id="sec.425-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person as follows (a <defterm guid="_687864cb-26f9-4cc5-8041-a9f3570fbe3e" id="sec.425-def.designatedperson" type="definition">designated person</defterm>) does not incur civil liability for an act done, or omission made, honestly and without negligence under this Act—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9e85f35a-191b-4461-8e72-0f918c8e406b" id="sec.425-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the Minister;</txt></block></li><li guid="_21cf07d0-7911-41ef-bdfa-35afcd6c4947" id="sec.425-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a public service officer or public service employee;</txt></block></li><li guid="_54ff7961-2390-4a4a-8564-bc19f49bc5d9" id="sec.425-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a person if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_76905c34-b6a2-47ab-9b07-79b0f9805906" id="sec.425-ssec.1-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the person has, under <intref check="valid" refid="sec.420" target.guid="_0ce806ac-cb36-4dbc-b5bd-f8ef9441220b">section 420</intref>, been authorised to carry out an activity for the State; and</txt></block></li><li guid="_fdd82794-e1f0-4f91-9066-59f043ccb3cd" id="sec.425-ssec.1-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the act or omission happened while the person was acting within the scope of that authority;</txt></block></li></list></block></li><li guid="_4e217dad-a7ec-40f1-b7cc-5318d4dc1f94" id="sec.425-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a GHG tenure holder given a serious situation direction who is complying with the direction.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_66c9026f-13cc-426c-a840-7b63b0ebabc0" id="sec.425-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.425-ssec.1" target.guid="_7ba11e7a-ff71-4e50-90f5-ec635f50f4a0">subsection (1)</intref><intref check="valid" refid="sec.425-ssec.1-para1.b" target.guid="_21cf07d0-7911-41ef-bdfa-35afcd6c4947">(b)</intref>, it does not matter what is the form of appointment or employment of the person.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_539187e2-0572-4e64-8559-2cce910bf685" id="sec.425-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If <intref check="valid" refid="sec.425-ssec.1" target.guid="_7ba11e7a-ff71-4e50-90f5-ec635f50f4a0">subsection (1)</intref> prevents a civil liability attaching to a designated person, the liability attaches instead to the State.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8429d0f2-2a2e-4143-bb63-f6d183fbe15f" id="sec.425-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_83c0107a-d182-4f21-9728-df8f939a33aa" id="sec.425-ssec.4-def.civilliability_"><txt break.before="1"><defterm guid="_27a7975a-63e6-48bd-b9fe-2a1797ac48fc" id="sec.425-ssec.4-def.civilliability" type="definition">civil liability</defterm> includes liability for the payment of costs ordered to be paid in a proceeding for an offence against this Act.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_5e0415cf-e0b2-4b30-8312-6fab889f1032" id="sec.426" provision.type="other" spent.amends="0"><no>426</no><heading guid="_b666df87-eefc-461a-8d5c-c3e4fa3bceb6" id="sec.426-he">Delegation by Minister or chief executive</heading><subclause affected.by.uncommenced="0" guid="_e6889bf5-dc10-4a78-a657-8758288ee1f2" id="sec.426-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may delegate the Minister’s functions under this Act to an appropriately qualified public service officer or employee.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_cba07dda-76f3-4232-99c1-5d8e9ee090a3" id="sec.426-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may delegate the chief executive’s functions under this Act to an appropriately qualified public service officer or employee.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_940671d5-098f-4788-9702-28d71351dce9" id="sec.426-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_5aeab703-a05f-460c-958a-7e9575b8395d" id="sec.426-ssec.3-def.functions_"><txt break.before="1"><defterm guid="_0f992e5a-fdde-4835-90a0-7e33ef6e2f5d" id="sec.426-ssec.3-def.functions" type="definition">functions</defterm> includes powers.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1dffc2de-5a2c-4887-901c-ca5f24022f96" id="sec.428" provision.type="other" spent.amends="0"><no>428</no><heading guid="_13ac4471-faf0-48d2-b128-ceb54e798163" id="sec.428-he">Approved forms</heading><subclause affected.by.uncommenced="0" guid="_5fdf4c24-54c6-4e6e-8c4d-6819030380b0" id="sec.428-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may approve forms for use under this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a06b4c12-5f04-4034-902b-c1037abb6717" id="sec.428-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A form may be approved for use under this Act that is combined with or is to be used together with an approved form under another Act.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_25e43fd8-1ac9-41dc-85dc-aab444f7c5b6" id="sec.429" provision.type="other" spent.amends="0"><no>429</no><heading guid="_40f70420-9877-465d-8d6a-349baa78e0ac" id="sec.429-he">Regulation-making power</heading><subclause affected.by.uncommenced="0" guid="_b51207fe-fc76-4527-92b8-ba647712408c" id="sec.429-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Governor in Council may make regulations under this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ca0fe477-528e-4ed2-95b4-87fc732f3e7f" id="sec.429-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A regulation may—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_61b515fd-fb28-4bb9-82b7-8662f3996083" id="sec.429-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be made about the fees payable under this Act including late payment fees; or</txt></block></li><li guid="_9af28a17-c8b7-42b3-bdd3-c794321cb12b" id="sec.429-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">impose a penalty for a contravention of a provision of a regulation of no more than 20 penalty units; or</txt></block></li><li guid="_8b1d451a-cece-4a58-8b8f-1c9162559cc8" id="sec.429-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">be made about the way an application, document or submission must be made or given for <intref check="valid" refid="sec.411" target.guid="_1563d9ac-bd31-449e-842a-931b0e660c2b">section 411</intref><intref check="valid" refid="sec.411-ssec.2" target.guid="_fcd5e1c1-c159-4a2c-87a0-23a0acfcdc84">(2)</intref><intref check="valid" refid="sec.411-ssec.2-para1.b" target.guid="_75b4d2ac-1af7-420d-bcdb-44710dba0e50">(b)</intref>, or the way a report must be given for <intref check="valid" refid="sec.255" target.guid="_c71a3b14-1ff6-41ae-a3e2-86a31cddb36a">section 255</intref><intref check="valid" refid="sec.255-ssec.2" target.guid="_b6f9e3b7-9076-47ea-b7a9-87ec375f6fef">(2)</intref><intref check="valid" refid="sec.255-ssec.2-para1.b" target.guid="_175a9017-4b82-499a-939f-3d6aa3222768">(b)</intref>, including, for example—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4a27fd3a-fdbf-4053-bf54-90105f5169c7" id="sec.429-ssec.2-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">practices and procedures for lodgement of applications and other documents; and</txt></block></li><li guid="_5ea1c990-a45d-435d-b04a-cf1aa1768a4b" id="sec.429-ssec.2-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">methods for acknowledging receipt of documents; and</txt></block></li><li guid="_77885e82-857f-4986-942e-db07996f3810" id="sec.429-ssec.2-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">methods for acceptance of the lodgement of documents; and</txt></block></li><li guid="_c08c83c1-1357-47f5-80dc-9d797b42429e" id="sec.429-ssec.2-para1.c-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">the time at which a document is taken to have been lodged, but only to the extent that this Act does not provide otherwise; or</txt></block></li></list></block></li><li guid="_07d90dac-25f7-43b8-8195-f1cd8ccbe8ed" id="sec.429-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">requiring lodgement of a hard copy of the application, document or submission.</txt></block></li></list></block></subclause></clause></part></chapter><chapter affected.by.uncommenced="0" guid="_27ce5287-c937-4b54-8b6a-3deb8c1068b0" id="ch.8"><no>Chapter 8</no><heading guid="_8c45f35b-bb38-4a04-bed8-08d9cf513324" id="ch.8-he">Transitional provisions</heading><part affected.by.uncommenced="0" guid="_3e1695db-12eb-4bf5-93cb-5822e8337a36" id="ch.8-pt.1"><no>Part 1</no><heading guid="_92303028-d616-438d-9146-cce725fe9278" id="ch.8-pt.1-he">Transitional provisions for Act No. 3 of 2009</heading><clause affected.by.uncommenced="0" guid="_61750a16-ed85-436d-94e4-3b7ce8a0c585" id="sec.430" provision.type="transitional" spent.amends="0"><no>430</no><heading guid="_0973ee64-1b5b-457b-8c97-316a66d64717" id="sec.430-he">Definitions for pt 1</heading><block><txt break.before="1">In this part—</txt><deflist><definition affected.by.uncommenced="0" guid="_213fbc36-8f3e-4349-8a33-fe0d2f20aae6" id="sec.430-def.assent_"><txt break.before="1"><defterm guid="_b2173bd6-133c-4442-b2d4-d378bd79eb26" id="sec.430-def.assent" type="definition">assent </defterm>means the date of assent of this Act.</txt></definition><definition affected.by.uncommenced="0" guid="_86d1c342-f4fd-4e06-a0c4-f6b9b5e18348" id="sec.430-def.newGHGpermit_"><txt break.before="1"><defterm guid="_ce9972b7-6be8-4b20-bba5-d555515e0377" id="sec.430-def.newGHGpermit" type="definition">new GHG permit</defterm> see section 432(1).</txt></definition><definition affected.by.uncommenced="0" guid="_6ca2f6d1-5611-4a13-9c50-175e15a1cfbe" id="sec.430-def.Zerogen_"><txt break.before="1"><defterm guid="_4422716e-5f5d-46ac-ae19-0f233251dd64" id="sec.430-def.Zerogen" type="definition">Zerogen </defterm>means Zerogen Pty Ltd (ACN 118 696 932).</txt></definition></deflist></block></clause><clause affected.by.uncommenced="0" guid="_bf9e103b-1e92-4802-b147-9cb89ddac571" id="sec.431" provision.type="transitional" spent.amends="0"><no>431</no><heading guid="_ef7b4e67-d53c-41dc-943a-3ea055cc22fa" id="sec.431-he">Conversion of Zerogen’s <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref> ATPs</heading><subclause affected.by.uncommenced="0" guid="_b98f8e1d-3653-4a20-9fd7-dd89b18c1ede" id="sec.431-ssec.1" provision.type="transitional"><no>(1)</no><block><txt break.before="0">This section applies to <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref> ATP 830 and to <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref> ATP 835 both held by Zerogen.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9da08c22-86fd-4ab2-9dfe-129fbf102332" id="sec.431-ssec.2" provision.type="transitional"><no>(2)</no><block><txt break.before="0">On assent—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c2436c43-d262-4e61-8569-5cbb3b0d5ba1" id="sec.431-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">each of the ATPs—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1fae1125-9afa-4657-8a3d-17901aadb666" id="sec.431-ssec.2-para1.a-para2.i" provision.type="transitional"><no>(i)</no><block><txt break.before="0">becomes a GHG permit; and</txt></block></li><li guid="_6a13ef15-208a-4c33-a654-5026beef17a6" id="sec.431-ssec.2-para1.a-para2.ii" provision.type="transitional"><no>(ii)</no><block><txt break.before="0">ceases to be a <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref> ATP; and</txt></block></li></list></block></li><li guid="_288b8add-3b8e-4b14-b410-436bc73334ef" id="sec.431-ssec.2-para1.b" provision.type="transitional"><no>(b)</no><block><txt break.before="0">the work program for each of the ATPs becomes the work program for the GHG permit that it becomes.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_15950d68-6cea-405d-91d1-58e962dbeedf" id="sec.431-ssec.3" provision.type="transitional"><no>(3)</no><block><txt break.before="0">The Minister may amend the following in any way the Minister considers appropriate to reflect the changes under subsection (2)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_de8e60b1-dc2b-488a-bcd8-2bf591a01c9f" id="sec.431-ssec.3-para1.a" provision.type="transitional"><no>(a)</no><block><txt break.before="0">the instruments for the ATPs;</txt></block></li><li guid="_addcc925-96d4-4b65-a52c-4c3d54d03896" id="sec.431-ssec.3-para1.b" provision.type="transitional"><no>(b)</no><block><txt break.before="0">their work programs under the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c69d8dc3-3368-4cac-ab19-28ed0d60bba5" id="sec.431-ssec.4" provision.type="transitional"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_6c7b5065-bc28-4e77-a924-88b4c0fd5d46" id="sec.431-ssec.4-def.amend_"><txt break.before="1"><defterm guid="_d9358706-9160-48e4-bd15-68486e8b975b" id="sec.431-ssec.4-def.amend" type="definition">amend</defterm> includes remake.</txt></definition><definition affected.by.uncommenced="0" guid="_8f608984-ecf3-4905-a888-7ecd9e4db56b" id="sec.431-ssec.4-def.PGActATP_"><txt break.before="1"><defterm guid="_73d16743-1c2f-4910-a621-2da3616bb486" id="sec.431-ssec.4-def.PGActATP" type="definition">P&#38;G Act ATP</defterm> means an ATP under the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_41e29d0b-5f26-4bb0-911e-79aac5de9b37" id="sec.432" provision.type="transitional" spent.amends="0"><no>432</no><heading guid="_410a355f-b666-4d83-a9a4-e6c1ac1538a1" id="sec.432-he">New GHG permit for Zerogen</heading><subclause affected.by.uncommenced="0" guid="_df455220-cab2-4e64-9a22-0b5e31429e3a" id="sec.432-ssec.1" provision.type="transitional"><no>(1)</no><block><txt break.before="0">On assent, Zerogen is taken to have been granted a GHG permit (the <defterm guid="_5c2d09a9-a3af-41eb-9d36-8db4ed700bd3" id="sec.432-def.newGHGpermit" type="definition">new GHG permit</defterm>) for the following sub-blocks—</txt></block><block><table colsep="0" font.size="12.pt" frame="none" guid="_5ff1c5ce-e6b1-4447-99ea-180a70e42715" heading.align="left" id="sec.432-ssec.1-tbl" orient="port" rowsep="0"><tgroup cols="2" colsep="0" rowsep="0" tgroupstyle="2columnUnRuled"><colspec colname="1" colnum="1" colsep="0" colwidth="1.147in"/><colspec colname="2" colnum="2" colsep="0" colwidth="2.988in"/><thead><row guid="_7cbdfd8d-5243-41ba-9661-569a55cffeb3" id="sec.432-ssec.1-tbl-tblh-tblr" rowsep="0"><entry guid="_ac8c0f5f-021b-41ea-8b9d-02124236383c" id="sec.432-ssec.1-tbl-tblh-tblr-tble1" nameend="2" namest="1"><block><txt break.before="1">Charleville block identification map</txt></block></entry></row><row guid="_bbaa9eb4-9efa-4e60-9ea4-6b31a5f0d0f1" id="sec.432-ssec.1-tbl-tblh-tblr-oc.2" rowsep="0"><entry align="left" colname="1" guid="_9fffdfb9-da6d-43e9-ac68-9c2b2123de19" id="sec.432-ssec.1-tbl-tblh-tblr-oc.2-tble1" valign="top"><block><txt break.before="1"><b>Block</b></txt></block></entry><entry align="left" colname="2" guid="_21c7cc43-d61b-4ed9-a71b-0dc46efa99f0" id="sec.432-ssec.1-tbl-tblh-tblr-oc.2-tble2" valign="top"><block><txt break.before="1"><b>Sub-blocks</b></txt></block></entry></row></thead><tbody><row guid="_8b11709d-e8e8-40f4-85e7-6e9ec5be026e" id="sec.432-ssec.1-tbl-tblr" rowsep="0"><entry align="left" colname="1" guid="_1a162e50-b384-45ac-bff4-b04f348c880b" id="sec.432-ssec.1-tbl-tblr-tble1" valign="top"><block><txt break.before="1">55</txt></block></entry><entry align="left" colname="2" guid="_14c2f24c-dd4f-421d-af6f-9921f1906a97" id="sec.432-ssec.1-tbl-tblr-tble2" valign="top"><block><txt break.before="1">a, b, c, d, e, f, g, h, j, k, m, n, o, p, s, t, u, x, y and z</txt></block></entry></row><row guid="_3a17701e-08ed-4688-84de-d54c2bcc714c" id="sec.432-ssec.1-tbl-tblr-oc.2" rowsep="0"><entry align="left" colname="1" guid="_e770a559-67b0-44e3-993a-f660c11d547a" id="sec.432-ssec.1-tbl-tblr-oc.2-tble1" valign="top"><block><txt break.before="1">56</txt></block></entry><entry align="left" colname="2" guid="_5d646da4-f31a-43c5-9588-479ec22123e1" id="sec.432-ssec.1-tbl-tblr-oc.2-tble2" valign="top"><block><txt break.before="1">a, b, c, d, e, f, g, h, j, k, l, m, n, o, p, q, r, s, t, u, v, w, x, y and z</txt></block></entry></row></tbody></tgroup></table></block><block><table colsep="0" font.size="12.pt" frame="none" guid="_58f6520b-99ee-4228-bd6d-7a8d47158d3d" heading.align="left" id="sec.432-ssec.1-tbl-oc.2" orient="port" rowsep="0"><tgroup cols="2" colsep="0" rowsep="0" tgroupstyle="2columnUnRuled"><colspec colname="1" colnum="1" colsep="0" colwidth="1.137in"/><colspec colname="2" colnum="2" colsep="0" colwidth="2.999in"/><thead><row guid="_daaa3a5d-b351-432b-b7ae-1652b144ce1e" id="sec.432-ssec.1-tbl-oc.2-tblh-tblr" rowsep="0"><entry guid="_ddbcaa66-de6f-4e7d-9a8a-bdd8c259fea2" id="sec.432-ssec.1-tbl-oc.2-tblh-tblr-tble1" nameend="2" namest="1"><block><txt break.before="1">Clermont block identification map</txt></block></entry></row><row guid="_ed2a9e5d-0fa9-45db-a069-a51e174f1a31" id="sec.432-ssec.1-tbl-oc.2-tblh-tblr-oc.2" rowsep="0"><entry align="left" colname="1" guid="_a9a7b126-d850-4e26-9a4c-e9a2d122d051" id="sec.432-ssec.1-tbl-oc.2-tblh-tblr-oc.2-tble1" valign="top"><block><txt break.before="1"><b>Block</b></txt></block></entry><entry align="left" colname="2" guid="_baf8a56e-dec6-49f6-8610-5556709d7821" id="sec.432-ssec.1-tbl-oc.2-tblh-tblr-oc.2-tble2" valign="top"><block><txt break.before="1"><b>Sub-blocks</b></txt></block></entry></row></thead><tbody><row guid="_f7a27677-3fd6-4f17-8cdf-914882696a44" id="sec.432-ssec.1-tbl-oc.2-tblr" rowsep="0"><entry align="left" colname="1" guid="_9be54b93-f0af-4330-9281-eff16d0c5a57" id="sec.432-ssec.1-tbl-oc.2-tblr-tble1" valign="top"><block><txt break.before="1">3147</txt></block></entry><entry align="left" colname="2" guid="_bb8238f9-0b9d-446b-aba5-90cd0a2f3674" id="sec.432-ssec.1-tbl-oc.2-tblr-tble2" valign="top"><block><txt break.before="1">a, b, c, d, e, f, g, h, j, k, l, m, n, o, p, q, r, s, t, u, v, w, x, y and z</txt></block></entry></row><row guid="_d797f77c-43f3-4a0c-aca3-54ad45eed6bf" id="sec.432-ssec.1-tbl-oc.2-tblr-oc.2" rowsep="0"><entry align="left" colname="1" guid="_84133a59-9c04-4e0b-9528-121863e47241" id="sec.432-ssec.1-tbl-oc.2-tblr-oc.2-tble1" valign="top"><block><txt break.before="1">3219</txt></block></entry><entry align="left" colname="2" guid="_66afdea1-60ba-4a1d-bc87-42836a1583cf" id="sec.432-ssec.1-tbl-oc.2-tblr-oc.2-tble2" valign="top"><block><txt break.before="1">a, b, c, d, e, f, g, h, j and k</txt></block></entry></row><row guid="_1da77185-d201-4437-a3f7-1ec7808b13a3" id="sec.432-ssec.1-tbl-oc.2-tblr-oc.3" rowsep="0"><entry align="left" colname="1" guid="_ee1df91d-9bb8-4428-9e72-918b38369150" id="sec.432-ssec.1-tbl-oc.2-tblr-oc.3-tble1" valign="top"><block><txt break.before="1">3291</txt></block></entry><entry align="left" colname="2" guid="_42cf961a-f6cf-46a5-8e06-ccd1c9cba10f" id="sec.432-ssec.1-tbl-oc.2-tblr-oc.3-tble2" valign="top"><block><txt break.before="1">a, b, c, d, e, f, g, h, j, k, l, m, n, o, p, q, r, s, t, u, v, w, x, y and z</txt></block></entry></row><row guid="_3250b336-f674-4b1f-bf77-6dacee20f200" id="sec.432-ssec.1-tbl-oc.2-tblr-oc.4" rowsep="0"><entry align="left" colname="1" guid="_a63d30ae-b642-4a5e-8b45-698cdd6640dc" id="sec.432-ssec.1-tbl-oc.2-tblr-oc.4-tble1" valign="top"><block><txt break.before="1">3364</txt></block></entry><entry align="left" colname="2" guid="_87845a44-7122-47dd-806d-2ad61af4d06f" id="sec.432-ssec.1-tbl-oc.2-tblr-oc.4-tble2" valign="top"><block><txt break.before="1">a, b, f, g, l, m, n, q, r, s, v, w and x</txt></block></entry></row><row guid="_a5ababcd-f0d4-45f6-8923-d1387e408634" id="sec.432-ssec.1-tbl-oc.2-tblr-oc.5" rowsep="0"><entry align="left" colname="1" guid="_f3f9c35e-3707-4aa3-8b72-4d0d7df0122c" id="sec.432-ssec.1-tbl-oc.2-tblr-oc.5-tble1" valign="top"><block><txt break.before="1">3365</txt></block></entry><entry align="left" colname="2" guid="_18922d71-7827-43ec-a3ff-5c6c52bcc5bf" id="sec.432-ssec.1-tbl-oc.2-tblr-oc.5-tble2" valign="top"><block><txt break.before="1">c, d, e, h, j, k, n, o, p, t, u and z</txt></block></entry></row><row guid="_fae264b1-8f6c-482b-9719-e24b0fdc4c44" id="sec.432-ssec.1-tbl-oc.2-tblr-oc.6" rowsep="0"><entry align="left" colname="1" guid="_823b4966-71a7-4244-bbbc-6d2a18dfdc99" id="sec.432-ssec.1-tbl-oc.2-tblr-oc.6-tble1" valign="top"><block><txt break.before="1">3366</txt></block></entry><entry align="left" colname="2" guid="_d0455fd6-3d21-45c9-86f8-96dcfdb031d4" id="sec.432-ssec.1-tbl-oc.2-tblr-oc.6-tble2" valign="top"><block><txt break.before="1">a, b, c, d, e, f, g, h, j, k, l, m, n, o, p, q, r, s, t, u, v, w, x, y and z</txt></block></entry></row><row guid="_931050ef-9cae-4ec6-80c9-f724bdc41c08" id="sec.432-ssec.1-tbl-oc.2-tblr-oc.7" rowsep="0"><entry align="left" colname="1" guid="_6998b261-9448-406a-946e-cfd7bd4033df" id="sec.432-ssec.1-tbl-oc.2-tblr-oc.7-tble1" valign="top"><block><txt break.before="1">3436</txt></block></entry><entry align="left" colname="2" guid="_386f3627-d2cb-44e2-9eec-673be20dd8fe" id="sec.432-ssec.1-tbl-oc.2-tblr-oc.7-tble2" valign="top"><block><txt break.before="1">a, b, c, d, e, f, g, h, j, k, l, m, n, o, p, q, r, s, t, u, v, w, x, y and z</txt></block></entry></row><row guid="_3f48ef93-af2d-4ebb-b4cd-2a3e7b36c8b8" id="sec.432-ssec.1-tbl-oc.2-tblr-oc.8" rowsep="0"><entry align="left" colname="1" guid="_df20ad9d-3516-40b9-9877-f540a54ab375" id="sec.432-ssec.1-tbl-oc.2-tblr-oc.8-tble1" valign="top"><block><txt break.before="1">3437</txt></block></entry><entry align="left" colname="2" guid="_922bef73-7b7c-4bf5-9f9f-f3e2040ad00f" id="sec.432-ssec.1-tbl-oc.2-tblr-oc.8-tble2" valign="top"><block><txt break.before="1">f, l, q, r, v, w and x</txt></block></entry></row><row guid="_4c8e5611-dcf9-4fdc-9dfd-9fd05514fa72" id="sec.432-ssec.1-tbl-oc.2-tblr-oc.9" rowsep="0"><entry align="left" colname="1" guid="_ef2163dd-a96d-4af3-b25d-6ea404159624" id="sec.432-ssec.1-tbl-oc.2-tblr-oc.9-tble1" valign="top"><block><txt break.before="1">3438</txt></block></entry><entry align="left" colname="2" guid="_2d277191-4198-4631-a9be-3d4355a50b9f" id="sec.432-ssec.1-tbl-oc.2-tblr-oc.9-tble2" valign="top"><block><txt break.before="1">a, b, c, d, e, g, h, j, k, n, o, p, s, t, u, y and z.</txt></block></entry></row></tbody></tgroup></table></block></subclause><subclause affected.by.uncommenced="0" guid="_34060f79-7ba7-4829-8e13-4ef03eece136" id="sec.432-ssec.2" provision.type="transitional"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_a817632e-1d2f-4894-b264-2d3f88fb5f1a" id="sec.432-ssec.2-def.blockidentificationmap_"><txt break.before="1"><defterm guid="_cda62e18-3454-462f-adcf-28712a773eab" id="sec.432-ssec.2-def.blockidentificationmap" type="definition">block identification map</defterm> means a map that forms part of the series of maps known as the ‘Block Identification Map—Series B’ held by the department.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_418a0bf5-25e2-49f3-8bc2-652d335d80c8" id="sec.432A" provision.type="transitional" spent.amends="0"><no>432A</no><heading guid="_adc7bc83-5c22-42eb-b1cd-08b215055c86" id="sec.432A-he">Correction of new GHG permit for Zerogen</heading><subclause affected.by.uncommenced="0" guid="_1b35cdcd-8a54-4ff4-9cd9-09a817465917" id="sec.432A-ssec.1" provision.type="transitional"><no>(1)</no><block><txt break.before="0">Despite section 432, from the commencement of this section, the new GHG permit described in section 432 is taken not to include the following sub-blocks—</txt></block><block><table colsep="0" font.size="12.pt" frame="none" guid="_552ae644-68a3-425a-a8b7-e7552e7def69" heading.align="left" id="sec.432A-ssec.1-tbl" orient="port" rowsep="0"><tgroup cols="2" colsep="0" rowsep="0" tgroupstyle="2columnUnRuled"><colspec colname="1" colnum="1" colsep="0" colwidth="2.068in"/><colspec colname="2" colnum="2" colsep="0" colwidth="2.068in"/><thead><row guid="_f3c8e19d-6203-4a45-9e28-e1a876b94c30" id="sec.432A-ssec.1-tbl-tblh-tblr" rowsep="0"><entry guid="_f4898348-8247-437f-8141-db728e5d41bc" id="sec.432A-ssec.1-tbl-tblh-tblr-tble1" nameend="2" namest="1"><block><txt break.before="1">Clermont block identification map</txt></block></entry></row><row guid="_fc04912b-f5ac-4a2d-87f6-344375b90faa" id="sec.432A-ssec.1-tbl-tblh-tblr-oc.2" rowsep="0"><entry align="left" colname="1" guid="_6814ef40-50c1-4b98-bc5c-7a18ed08a000" id="sec.432A-ssec.1-tbl-tblh-tblr-oc.2-tble1" valign="top"><block><txt break.before="1"><b>Block</b></txt></block></entry><entry align="left" colname="2" guid="_69eb4360-52fd-4bf5-a4be-40544a7feaf9" id="sec.432A-ssec.1-tbl-tblh-tblr-oc.2-tble2" valign="top"><block><txt break.before="1"><b>Sub-blocks</b></txt></block></entry></row></thead><tbody><row guid="_08938cb9-e3f4-46cd-bae0-541537a7a74d" id="sec.432A-ssec.1-tbl-tblr" rowsep="0"><entry align="left" colname="1" guid="_6c70ce70-a06b-4496-a979-4a0cb3e6b817" id="sec.432A-ssec.1-tbl-tblr-tble1" valign="top"><block><txt break.before="1">3436</txt></block></entry><entry align="left" colname="2" guid="_c1dcc5f5-4c31-41d2-bfa9-e15797b8d176" id="sec.432A-ssec.1-tbl-tblr-tble2" valign="top"><block><txt break.before="1">d and e</txt></block></entry></row></tbody></tgroup></table></block></subclause><subclause affected.by.uncommenced="0" guid="_dd56dd7d-2c4c-4c88-8c97-37ba97217ad6" id="sec.432A-ssec.2" provision.type="transitional"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_b601a7d4-d143-4ca0-817c-5aaccf245e70" id="sec.432A-ssec.2-def.blockidentificationmap_"><txt break.before="1"><defterm guid="_f8525890-1f4c-43d1-b64f-ae116d3e6738" id="sec.432A-ssec.2-def.blockidentificationmap" type="definition">block identification map</defterm> see section 432.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_6fc833c3-113d-43e9-9326-54e0ba191eec" id="sec.433" provision.type="transitional" spent.amends="0"><no>433</no><heading guid="_69d36615-919a-40ba-b2bf-666a75581565" id="sec.433-he">Authorised activities under Zerogen GHG permits may start from assent</heading><subclause affected.by.uncommenced="0" guid="_357b8882-be7d-4880-b904-8913c54cc21a" id="sec.433-ssec.1" provision.type="transitional"><no>(1)</no><block><txt break.before="0">From assent, Zerogen may, subject to this Act, carry out all authorised activities for any of its GHG permits mentioned in this part as if all of this Act commences on assent.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_24c2680b-ec4c-43e8-b773-0bcb51b94c86" id="sec.433-ssec.2" provision.type="transitional"><no>(2)</no><block><txt break.before="0">Without limiting subsection (1), chapter 4, part 6, division 1 applies for the GHG permits from assent.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_da74c047-bc36-4bdc-956c-a4bdc99ab528" id="sec.433-ssec.3" provision.type="transitional"><no>(3)</no><block><txt break.before="0">The authorised activities may be carried out despite chapter 4, part 6, division 1.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_31844697-ad48-49be-8dec-641bf88d6c8b" id="sec.433-ssec.4" provision.type="transitional"><no>(4)</no><block><txt break.before="0">Chapter 2, part 5 applies to the carrying out of the authorised activities.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e4d314a9-cb3b-44d8-9cc9-9e8ca58f7d30" id="sec.434" provision.type="transitional" spent.amends="0"><no>434</no><heading guid="_02d86ab1-2b7f-4095-9f85-52a39bc3b460" id="sec.434-he">Deciding provisions of new GHG permit</heading><subclause affected.by.uncommenced="0" guid="_8ee4e55f-c958-4296-ae27-d95c72856dec" id="sec.434-ssec.1" provision.type="transitional"><no>(1)</no><block><txt break.before="0">Zerogen must give the Minister a proposed work program for the new GHG permit as if all of this Act commences on assent.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e94d1416-2b24-4b80-9b20-25a173b9a2e5" id="sec.434-ssec.2" provision.type="transitional"><no>(2)</no><block><txt break.before="0">The proposed work program must comply with the initial work program requirements.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bd21466f-9596-457e-8e64-c72d9e13f448" id="sec.434-ssec.3" provision.type="transitional"><no>(3)</no><block><txt break.before="0">As soon as practicable after Zerogen complies with subsection (2), the Minister must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_66004dfd-6094-4edd-a597-45a955bdb7c0" id="sec.434-ssec.3-para1.a" provision.type="transitional"><no>(a)</no><block><txt break.before="0">decide whether to approve the proposed work program; and</txt></block></li><li guid="_f717beaa-6e73-45cc-9c5d-31a5e0a5f9de" id="sec.434-ssec.3-para1.b" provision.type="transitional"><no>(b)</no><block><txt break.before="0">if the approval is given—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_01e8685f-989c-4bbb-a905-55492cfe5435" id="sec.434-ssec.3-para1.b-para2.i" provision.type="transitional"><no>(i)</no><block><txt break.before="0">decide the provisions of the instrument for the GHG permit other than provisions relating to the permit’s area; and</txt></block></li><li guid="_22d638b9-7dd8-44c5-9f40-531a984e1c25" id="sec.434-ssec.3-para1.b-para2.ii" provision.type="transitional"><no>(ii)</no><block><txt break.before="0">give Zerogen the instrument.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_be0421c3-9c93-47e7-9fe5-9d1a1b87330e" id="sec.434-ssec.4" provision.type="transitional"><no>(4)</no><block><txt break.before="0">For subsection (3), sections 41, 44 and 45 apply as if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d59547ba-0400-42fd-b281-dd1963da28df" id="sec.434-ssec.4-para1.a" provision.type="transitional"><no>(a)</no><block><txt break.before="0">a call for tenders had been made for the area of each of the GHG permits; and</txt></block></li><li guid="_f6603de2-2e88-49a9-a38d-a680cc07de90" id="sec.434-ssec.4-para1.b" provision.type="transitional"><no>(b)</no><block><txt break.before="0">Zerogen had been the successful tenderer under the call for tenders.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_aa8344fc-ffc1-4cd8-96ca-782931e37c96" id="sec.435" provision.type="transitional" spent.amends="0"><no>435</no><heading guid="_0ba6570e-a4ff-4a34-8f0d-9594884a13cb" id="sec.435-he">Test plan for new GHG permit</heading><block><txt break.before="1">Despite section 80 not having commenced, Zerogen may give the Minister, and the Minister may approve under that section a test plan for GHG storage injection testing relating to the new GHG permit.</txt></block></clause><clause affected.by.uncommenced="0" guid="_2268e543-953f-4571-86a1-bd7170fcdd65" id="sec.436" provision.type="transitional" spent.amends="0"><no>436</no><heading guid="_f2ea394c-67cd-4a7a-9d86-df9bac68db62" id="sec.436-he">Functions under part may be performed before assent</heading><subclause affected.by.uncommenced="0" guid="_5e294e0d-6c91-4d1e-9661-f5346ea4cf2a" id="sec.436-ssec.1" provision.type="transitional"><no>(1)</no><block><txt break.before="0">If before assent the Minister or Zerogen purports to perform a function under this part that can be performed from assent, the function is taken to have been validly performed on assent.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d56e887a-c2ac-40f0-9df5-ad1b85207ece" id="sec.436-ssec.2" provision.type="transitional"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_18a4e785-6d42-4c92-b202-28524ef7e923" id="sec.436-ssec.2-def.function_"><txt break.before="1"><defterm guid="_f7d012e6-1dfc-4897-8eb6-618cf569bffe" id="sec.436-ssec.2-def.function" type="definition">function</defterm> includes power.</txt></definition></deflist></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_298112dd-4ea2-489c-bb62-979624063cbb" id="ch.8-pt.2"><no>Part 2</no><heading guid="_47cabe9e-d1c9-4165-bdc2-1bd6cd921da1" id="ch.8-pt.2-he">Transitional provisions for amendments under <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Energy Act 2010</name></legref></heading><clause affected.by.uncommenced="0" guid="_44720ebd-22cb-44ed-9e62-559d7a12ad82" id="sec.437" provision.type="transitional" spent.amends="0"><no>437</no><heading guid="_299701e6-2123-4112-9fa2-75964df455c6" id="sec.437-he">Land access code prevails over conditions</heading><block><txt break.before="1">If a condition of a GHG authority is inconsistent with a mandatory provision of the land access code, the mandatory provision prevails to the extent of the inconsistency.</txt></block></clause><clause affected.by.uncommenced="0" guid="_a901e545-7f16-4430-b62c-0c5c6919f5ad" id="sec.438" provision.type="transitional" spent.amends="0"><no>438</no><heading guid="_14f72870-3eda-4acd-8559-188635decb38" id="sec.438-he">Existing compensation agreements other than for notifiable road uses</heading><subclause affected.by.uncommenced="0" guid="_09ebf61d-a209-4457-ba89-b8ea1bf064d9" id="sec.438-ssec.1" provision.type="transitional"><no>(1)</no><block><txt break.before="0">This section applies if immediately before the commencement of this section a compensation agreement under chapter 5, part 10 was in force.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_41a115eb-36c2-41b4-bca7-c7c0a895e2a0" id="sec.438-ssec.2" provision.type="transitional"><no>(2)</no><block><txt break.before="0">On the commencement the agreement becomes a conduct and compensation agreement under chapter 5, part 10, division 1.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3bb48045-7ea2-4579-8c63-4ba1ece42880" id="sec.439" provision.type="transitional" spent.amends="0"><no>439</no><heading guid="_753688b4-cbaf-40cc-a763-2687a455252b" id="sec.439-he">Existing entry notices</heading><subclause affected.by.uncommenced="0" guid="_8f2c711d-f523-437b-bcba-b07ff51dd3e8" id="sec.439-ssec.1" provision.type="transitional"><no>(1)</no><block><txt break.before="0">This section applies to an entry notice for the carrying out of an authorised activity for a GHG authority if the notice complied with the entry notice requirements before the commencement of this section.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d3726633-2728-464f-9055-2690e72464fc" id="sec.439-ssec.2" provision.type="transitional"><no>(2)</no><block><txt break.before="0">The notice continues, according to its terms, to be valid for the carrying out of the activity after the commencement even though the notice does not comply with all of the entry notice requirements from the commencement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a71607d7-35fa-4d1d-a2f3-a8f166639f3b" id="sec.439-ssec.3" provision.type="transitional"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_e5ab9cc9-30a6-4af7-82ff-5cb687339983" id="sec.439-ssec.3-def.entrynoticerequirements_"><txt break.before="1"><defterm guid="_7457bcc5-3fb9-4317-9965-2e18cf8ac9c9" id="sec.439-ssec.3-def.entrynoticerequirements" type="definition">entry notice requirements</defterm> means the requirements under this Act relating to the giving of an entry notice.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_6a17d971-be4c-4d12-8866-bd258e90caa8" id="sec.440" provision.type="transitional" spent.amends="0"><no>440</no><heading guid="_1b462bdf-fba8-44d8-aa09-17821965f2f6" id="sec.440-he">References to geothermal tenure</heading><block><txt break.before="1">Until the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="yes">Geothermal Energy Act 2010</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.9" target.doc.id="act-2010-031" target.guid="_97df2812-c390-4c64-9776-5186bbcd5c46" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act">chapter 9</legref>, <legref check="valid" jurisd="QLD" refid="ch.9-pt.1" target.doc.id="act-2010-031" target.guid="_fed797e0-97c7-4867-8480-ee2b761627f5" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act">part 1</legref> commences, a reference in this Act to a geothermal tenure is taken to be a reference to a geothermal exploration permit.</txt></block></clause></part><part affected.by.uncommenced="0" guid="_cab64767-cd99-4849-b038-973a49f92212" id="ch.8-pt.3"><no>Part 3</no><heading guid="_23c818ad-70d0-4275-8e3f-84cff0f096fc" id="ch.8-pt.3-he">Transitional provisions for <legref check="valid" jurisd="QLD" target.doc.id="act-2012-020" target.version.series="4e1c57a6-0c15-4ced-ab75-46bc3da1c18c" type="act" valid.date="as.made"><name emphasis="no">Mines Legislation (Streamlining) Amendment Act 2012</name></legref></heading><division affected.by.uncommenced="0" guid="_29e23376-f879-419a-a8bb-cdbf2a727d5b" id="ch.8-pt.3-div.1"><no>Division 1</no><heading guid="_2ac00967-3b0d-42a1-9014-be43fde9760b" id="ch.8-pt.3-div.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_e76078f6-77b4-47b5-9d94-03f23866e11e" id="sec.441" provision.type="transitional" spent.amends="0"><no>441</no><heading guid="_b224e82b-2455-4c23-ba31-a905459af814" id="sec.441-he">Definitions for pt 3</heading><block><txt break.before="1">In this part—</txt><deflist><definition affected.by.uncommenced="0" guid="_1c00d32f-e714-4e8b-978c-42cc5240d739" id="sec.441-def.amendingAct_"><txt break.before="1"><defterm guid="_24f5530c-964d-49c3-b973-e94903d88bb7" id="sec.441-def.amendingAct" type="definition">amending Act</defterm> means the <legref check="valid" jurisd="QLD" target.doc.id="act-2012-020" target.version.series="4e1c57a6-0c15-4ced-ab75-46bc3da1c18c" type="act" valid.date="as.made"><name emphasis="yes">Mines Legislation (Streamlining) Amendment Act 2012</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_23884105-50bb-409f-a860-a57937ec18e1" id="sec.441-def.commencement_"><txt break.before="1"><defterm guid="_4ad785a7-09a7-474c-aaf4-63546f754fe9" id="sec.441-def.commencement" type="definition">commencement</defterm> means the commencement of the section in which the term is used.</txt></definition><definition affected.by.uncommenced="0" guid="_1c932bbe-88c5-451d-a68b-066a36c63987" id="sec.441-def.former_"><txt break.before="1"><defterm guid="_5aa6903a-1ae1-406a-9ecb-474d5820bcd3" id="sec.441-def.former" type="definition">former</defterm>, in relation to a provision, means the provision as in force before the commencement of the section in which the term is used.</txt></definition></deflist></block></clause></division><division affected.by.uncommenced="0" guid="_4f88e511-7bb3-44d8-ad2b-aedfe61535ab" id="ch.8-pt.3-div.2"><no>Division 2</no><heading guid="_c499be06-cbf0-4fc7-bc85-90e05a19bc16" id="ch.8-pt.3-div.2-he">Transitional provisions for amendments in amending Act commencing on assent</heading><clause affected.by.uncommenced="0" guid="_1b070bcc-9021-451c-8c78-6dc05f7d3481" id="sec.442" provision.type="transitional" spent.amends="0"><no>442</no><heading guid="_7f8db464-64cf-49ac-93aa-766e3615c755" id="sec.442-he">Land in a GHG authority’s area taken before the commencement</heading><subclause affected.by.uncommenced="0" guid="_cded320d-659c-451f-a0ca-fda68967d5d2" id="sec.442-ssec.1" provision.type="transitional"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d66e304b-7453-4531-a2c7-99befe77bfb0" id="sec.442-ssec.1-para1.a" provision.type="transitional"><no>(a)</no><block><txt break.before="0">land in a GHG authority’s area was taken under a resumption law before the commencement; and</txt></block></li><li guid="_82db507f-5c26-4075-af3a-006d5e5214a3" id="sec.442-ssec.1-para1.b" provision.type="transitional"><no>(b)</no><block><txt break.before="0">at the commencement, the entity taking the land has not taken action indicating the GHG authority was extinguished (wholly or partly) when the land was taken.</txt><note guid="_1f7ec632-5430-4919-859c-c47b200192b6" id="sec.442-ssec.1-para1.b-note" type="example"><heading guid="_a86f43ff-5f47-427f-b3f4-cc45f1f54ed3" id="sec.442-ssec.1-para1.b-note-he">Examples of action for paragraph (b)—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_75f5c75d-0a8a-4ef7-a9f8-beb5520f8d96" id="sec.442-ssec.1-para1.b-note-para2" provision.type="transitional"><no>•</no><block><txt break.before="0">serving a copy of the resumption notice for the taking of the land on the GHG authority holder (in the holder’s capacity as the holder of the authority)</txt></block></li><li guid="_89b8c95d-d329-4d84-bd66-feacf3b2ca3e" id="sec.442-ssec.1-para1.b-note-para2-oc.2" provision.type="transitional"><no>•</no><block><txt break.before="0">entering into a resumption agreement under the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="no">ALA</name></legref> with the GHG authority holder for the taking of the land</txt></block></li><li guid="_5f10f584-d7c5-42e2-9130-b6982cc42c55" id="sec.442-ssec.1-para1.b-note-para2-oc.3" provision.type="transitional"><no>•</no><block><txt break.before="0">negotiating, or taking other action relating to, the compensation payable to the GHG authority holder for the taking of the land</txt></block></li><li guid="_f6311925-b1ca-40fd-83d5-5abd6bd8fca1" id="sec.442-ssec.1-para1.b-note-para2-oc.4" provision.type="transitional"><no>•</no><block><txt break.before="0">paying compensation to the GHG authority holder for the taking of the land</txt></block></li><li guid="_ebc04099-9c9f-4f24-993e-2870ccb98480" id="sec.442-ssec.1-para1.b-note-para2-oc.5" provision.type="transitional"><no>•</no><block><txt break.before="0">arranging for the taking of the land to be recorded in the GHG register against the GHG authority</txt></block></li></list></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9ccd95a7-c4e0-482d-87a5-3d5659095c01" id="sec.442-ssec.2" provision.type="transitional"><no>(2)</no><block><txt break.before="0">The taking of the land did not extinguish (wholly or partly) the GHG authority or any other GHG interest relating to the authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_db9e6a25-ca1c-4022-9e7b-d0750dc821f4" id="sec.442-ssec.3" provision.type="transitional"><no>(3)</no><block><txt break.before="0">Subsection (2) does not affect the ending of a GHG interest (wholly or partly) in any other way, including, for example—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ccfcae8e-908a-4c2b-a854-fb7c84de1e36" id="sec.442-ssec.3-para1.a" provision.type="transitional"><no>(a)</no><block><txt break.before="0">by the entity taking the land acquiring the GHG interest (wholly or partly) under a separate commercial agreement or other arrangement with the holder of the interest; or</txt></block></li><li guid="_1f690e42-f11a-40dc-b9ce-3e4ed6c7f5ea" id="sec.442-ssec.3-para1.b" provision.type="transitional"><no>(b)</no><block><txt break.before="0">by the GHG interest holder surrendering the interest (wholly or partly) under this Act.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_855f444d-b614-40e8-b924-92b1c144034a" id="sec.443" provision.type="transitional" spent.amends="0"><no>443</no><heading guid="_eae9e6fb-8ee7-4f44-aaac-564286022203" id="sec.443-he">Land in a GHG authority’s area for which notice of intention to resume given before the commencement</heading><subclause affected.by.uncommenced="0" guid="_9d620b9f-a5af-4c78-a7f6-17796afd250c" id="sec.443-ssec.1" provision.type="transitional"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e8af123f-e156-4a68-b028-de10abb12a8d" id="sec.443-ssec.1-para1.a" provision.type="transitional"><no>(a)</no><block><txt break.before="0">before the commencement, an entity gave a notice of intention to resume for the proposed taking, under a resumption law, of land in a GHG authority’s area; and</txt></block></li><li guid="_07e32deb-a61c-40cc-8799-069b3027ddf8" id="sec.443-ssec.1-para1.b" provision.type="transitional"><no>(b)</no><block><txt break.before="0">at the commencement, the land had not been taken under the resumption law.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f2c58f6f-65a9-4a50-9640-1cfc674a1188" id="sec.443-ssec.2" provision.type="transitional"><no>(2)</no><block><txt break.before="0">If the land is taken other than by taking or otherwise creating an easement, sections 369A to 369D apply in relation to the taking, except that the resumption notice for the taking may provide for the extinguishment of a GHG interest on the taking even if the notice of intention to resume does not comply with section 369A(8).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b5b1dd90-3daa-475b-b49f-e74c5cd8d028" id="sec.443-ssec.3" provision.type="transitional"><no>(3)</no><block><txt break.before="0">If the land is taken by taking or otherwise creating an easement, section 369D applies in relation to the taking.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_d645f81d-0be4-4624-aa20-ee377d651cdb" id="ch.8-pt.3-div.3"><no>Division 3</no><heading guid="_ff963cef-89c9-4432-af53-8e632c701bdb" id="ch.8-pt.3-div.3-he">Transitional provisions for amendments in amending Act commencing by proclamation</heading><clause affected.by.uncommenced="0" guid="_ca5fa9f3-c430-435d-8118-ed5e8e4c0136" id="sec.444" provision.type="transitional" spent.amends="0"><no>444</no><heading guid="_4c4bf574-507c-4519-89a4-ec96f7da3f9f" id="sec.444-he">Undecided applications for approval of particular dealing</heading><subclause affected.by.uncommenced="0" guid="_dfd15c9d-fc69-4fc6-b23e-54f4bb15a8cd" id="sec.444-ssec.1" provision.type="transitional"><no>(1)</no><block><txt break.before="0">This section applies to an application for approval of a third party transfer—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9bf04d0e-f2c0-429b-ba31-f3930244566f" id="sec.444-ssec.1-para1.a" provision.type="transitional"><no>(a)</no><block><txt break.before="0">made, before the commencement, under former chapter 5, part 14, division 3; and</txt></block></li><li guid="_6f14954e-4d30-4382-92ac-285e7c95ccf0" id="sec.444-ssec.1-para1.b" provision.type="transitional"><no>(b)</no><block><txt break.before="0">not decided before the commencement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_dd8deffb-40d3-4bd5-b1b1-ea2158a5cbfc" id="sec.444-ssec.2" provision.type="transitional"><no>(2)</no><block><txt break.before="0">The Minister may continue to deal with the application under former chapter 5, part 14, division 3 as if the division had not been repealed under the amending Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6cb8dde4-8809-430f-8425-38f49a154eed" id="sec.444-ssec.3" provision.type="transitional"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_c7c4d3cf-19a7-4b33-afca-75c9f6a4c83a" id="sec.444-ssec.3-def.thirdpartytransfer_"><txt break.before="1"><defterm guid="_203dbef0-3698-4251-b6c8-e1f4cb798933" id="sec.444-ssec.3-def.thirdpartytransfer" type="definition">third party transfer</defterm> has the meaning given by former section 347.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_233f8c9b-c898-4b1a-988d-33ec5500dfdd" id="sec.445" provision.type="transitional" spent.amends="0"><no>445</no><heading guid="_d04fb6bd-26c0-4237-a683-7c230b4810fe" id="sec.445-he">Deciding applications for approval of assessable transfers until commencement of particular provisions</heading><subclause affected.by.uncommenced="0" guid="_fa110f69-887a-4c4b-846a-929ffbcf1f1c" id="sec.445-ssec.1" provision.type="transitional"><no>(1)</no><block><txt break.before="0">This section applies until the commencement of the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act"><name emphasis="yes">Environmental Protection Act 1994</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.5A" target.doc.id="act-1994-062" target.guid="_2b52a4da-fe63-479a-a28d-a8c46c78d524" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act">chapter 5A</legref>, <legref check="valid" jurisd="QLD" refid="ch.5A-pt.4" target.doc.id="act-1994-062" target.guid="_ae9f3dd2-d898-45bb-bd71-d24934051a20" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act">part 4</legref> as inserted by the <legref check="valid" jurisd="QLD" target.doc.id="act-2012-016" target.version.series="d426ea1a-12a5-403e-b1fd-e94cdb4996fb" type="act" valid.date="as.made"><name emphasis="yes">Environmental Protection (Greentape Reduction) and Other Legislation Amendment Act 2012</name></legref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f03d5634-364e-4a9b-bf4d-978a37f97189" id="sec.445-ssec.2" provision.type="transitional"><no>(2)</no><block><txt break.before="0">Former section 353(2)(a) continues in force instead of section 354(4)(b), as inserted by the amending Act, for deciding whether to give an approval of an assessable transfer.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_821be491-91c6-4e4d-b25e-e53545d6969f" id="sec.446" provision.type="transitional" spent.amends="0"><no>446</no><heading guid="_27a9218c-8ba3-4d6e-a34e-42f09eb2c353" id="sec.446-he">Uncommenced appeals about refusal to approve particular dealing</heading><subclause affected.by.uncommenced="0" guid="_0d378c7b-35af-4e69-b773-5dc4d4dea316" id="sec.446-ssec.1" provision.type="transitional"><no>(1)</no><block><txt break.before="0">This section applies to a person if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c3d10b86-081a-448e-aafa-ea4abd49f38f" id="sec.446-ssec.1-para1.a" provision.type="transitional"><no>(a)</no><block><txt break.before="0">before the commencement, the person could appeal to the Land Court under section 395 in relation to a refusal to approve a third party transfer under former section 353; but</txt></block></li><li guid="_1aea3d3d-717a-4bbb-9f45-7e68abddb488" id="sec.446-ssec.1-para1.b" provision.type="transitional"><no>(b)</no><block><txt break.before="0">the person had not started the appeal before the commencement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_92d96471-347b-4336-9ef2-da250ce26d69" id="sec.446-ssec.2" provision.type="transitional"><no>(2)</no><block><txt break.before="0">Despite the amendment of schedule 1 by the amending Act, the person continues to be a person who may start an appeal under section 395, subject to sections 396 and 397.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_416a5694-b67f-4da7-94e1-d08beb5167d1" id="sec.447" provision.type="transitional" spent.amends="0"><no>447</no><heading guid="_03c37e69-8139-4692-be27-f18e3c6dbd65" id="sec.447-he">Unfinished appeals about refusal to approve particular dealing</heading><subclause affected.by.uncommenced="0" guid="_2028a039-f688-4de8-8d82-7b6a7c20fbe8" id="sec.447-ssec.1" provision.type="transitional"><no>(1)</no><block><txt break.before="0">This section applies if, before the commencement—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e82018f4-4808-4db1-9938-72cbaaa438b2" id="sec.447-ssec.1-para1.a" provision.type="transitional"><no>(a)</no><block><txt break.before="0">a person started an appeal under section 397 in relation to a refusal to approve an assessable transfer under former section 353; and</txt></block></li><li guid="_66432c60-66bd-44a3-b296-0efb915e40ef" id="sec.447-ssec.1-para1.b" provision.type="transitional"><no>(b)</no><block><txt break.before="0">the Land Court had not yet decided the appeal.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d57e41f4-5606-4a32-bd25-4c1afde91e94" id="sec.447-ssec.2" provision.type="transitional"><no>(2)</no><block><txt break.before="0">The Land Court may continue, under chapter 6, part 3, to grant a stay of the decision being appealed, and hear and decide the appeal.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_cae0e10e-d5cd-452a-bd50-60e55b260b73" id="ch.8-pt.4"><no>Part 4</no><heading guid="_601f641e-e1ae-4096-bed2-93fdcdadc364" id="ch.8-pt.4-he">Transitional provisions for <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Mineral and Energy Resources (Common Provisions) Act 2014</name></legref></heading><clause affected.by.uncommenced="0" guid="_d6bfa01b-39ba-42b7-b3ab-93ec78ec0e09" id="sec.448" provision.type="transitional" spent.amends="0"><no>448</no><heading guid="_6d8701b3-65fd-40d2-a054-19071f126037" id="sec.448-he">Continued appeal right for particular decisions</heading><subclause affected.by.uncommenced="0" guid="_c19cc96f-0319-40e4-bd5d-d32b1baac3df" id="sec.448-ssec.1" provision.type="transitional"><no>(1)</no><block><txt break.before="0">A person who, before the commencement of this section, may have appealed against a relevant decision to the Land Court under section 395(1), may still appeal against the decision, in compliance with chapter 6, part 3, despite the amendment of schedule 1 by the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fd00d643-9077-4f7f-b4df-e7dda4f85692" id="sec.448-ssec.2" provision.type="transitional"><no>(2)</no><block><txt break.before="0">In this section—</txt></block><block><txt break.before="1"><defterm guid="_125edc71-e2ce-4fff-b228-c921df21ce1a" id="sec.448-def.previous" type="definition">previous</defterm>, for a section of this Act, means the section as in force immediately before the repeal of the section under the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>.</txt></block><block><txt break.before="1"><defterm guid="_c043a705-cdfc-4e1a-a94d-f8e0211abe05" id="sec.448-def.relevantdecision" type="definition">relevant decision</defterm> means any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b28039b5-657c-4eaa-a3ec-c2f6ffd6dce8" id="sec.448-ssec.2-para1.a" provision.type="transitional"><no>(a)</no><block><txt break.before="0">a decision to give a road use direction under previous section 303;</txt></block></li><li guid="_e8784b7e-0cd8-46e7-a271-7eec405ca780" id="sec.448-ssec.2-para1.b" provision.type="transitional"><no>(b)</no><block><txt break.before="0">the imposition of condition on entry on public land under previous section 315, other than a condition agreed to or requested by the relevant GHG authority holder;</txt></block></li><li guid="_ea70bbb8-efa0-4fb7-9a0a-87571fadf331" id="sec.448-ssec.2-para1.c" provision.type="transitional"><no>(c)</no><block><txt break.before="0">a refusal to approve an assessable transfer under previous section 354.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d921724b-4cad-4fc4-8041-b571e4068bb4" id="sec.449" provision.type="transitional" spent.amends="0"><no>449</no><heading guid="_3b5554f1-1808-4f71-995d-d718ab84178c" id="sec.449-he">Existing practice manuals</heading><subclause affected.by.uncommenced="0" guid="_0bf4d0c0-818e-4c44-9a3c-1fe17c4eed34" id="sec.449-ssec.1" provision.type="transitional"><no>(1)</no><block><txt break.before="0">A practice manual kept under former section 427 continues in effect until the chief executive makes a manual available under the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.202" target.doc.id="act-2014-047" target.guid="_d10df67e-56a6-483e-ade1-709dbda3a60c" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">section 202</legref><legref check="invalid" jurisd="QLD" type="act">(4)</legref><legref check="invalid" jurisd="QLD" type="act">(b)</legref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9b403922-54f4-409d-bb9c-66dfddcab854" id="sec.449-ssec.2" provision.type="transitional"><no>(2)</no><block><txt break.before="0">In this section—</txt></block><block><txt break.before="1"><defterm guid="_16999db6-8891-49b4-a547-f12e9e5991b7" id="sec.449-def.formersection427" type="definition">former section 427</defterm> means section 427 as in force immediately before the commencement of this section.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" change="ins" guid="_8eac078b-fc65-4658-8657-5dc38648ecdf" id="ch.8-pt.5"><no>Part 5</no><heading guid="_c79952ca-e3fb-4cd2-bad0-bf6aa2b83683" id="ch.8-pt.5-he">Transitional provisions for <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Mineral and Energy Resources and Other Legislation Amendment Act 2020</name></legref></heading><clause affected.by.uncommenced="0" guid="_bc268cae-9038-442b-a00f-a1d6b613913c" id="sec.450" provision.type="transitional" spent.amends="0"><no>450 </no><heading guid="_49afd012-1d89-48b1-978b-a638a518dc29" id="sec.450-he">Power to impose or amend condition if changed holder of GHG permit or GHG lease</heading><block><txt break.before="1">The power of the Minister to impose another condition on, or amend a condition of, a GHG permit under section 92A or a GHG lease under section 173A applies—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_42c304fe-e313-4357-a66f-53f78ea6ff1b" id="sec.450-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">whether the permit or lease was granted before or after the commencement; and</txt></block></li><li guid="_5fd224b1-19f5-4d6f-b78a-1343719aeca9" id="sec.450-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">only if the change mentioned in section 92A(1) or 173A(1) happens after the commencement.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_9b1e9ea6-064e-4bfb-ae53-e3117223382b" id="sec.451" provision.type="transitional" spent.amends="0"><no>451</no><heading guid="_4c6d530e-d34d-48ca-936d-d02c7b59d1b0" id="sec.451-he">Conferences with eligible claimants or owners or occupiers started before commencement</heading><subclause affected.by.uncommenced="0" guid="_38cf21e1-8cc6-4f03-ad88-84bba61704fe" id="sec.451-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_351074f2-d128-497b-86d1-f6a8ab9ad436" id="sec.451-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an authorised officer asked parties to attend a conference under section 377B as in force before the commencement; and</txt></block></li><li guid="_5f2fc851-c00c-4a33-99ab-9ca61ac65cef" id="sec.451-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">immediately before the commencement the conference had not taken place.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_56b6d5a6-2156-47cc-a5e3-718a1343ab48" id="sec.451-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The conference must take place under chapter 6, part 1A as in force immediately before the commencement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7e77884e-1b62-4cce-8209-b58333fba3c6" id="sec.451-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Common Provisions Act, chapter 3, part 8 does not apply in relation to the conference.</txt></block></subclause></clause></part></chapter></body></wrapper><schedules affected.by.uncommenced="0" numbering.style="manual"><schedule affected.by.uncommenced="0" guid="_aa7d85fe-e407-4e5c-a7c6-7f5868e466fb" id="sch.1" numbering.style="manual" provision.type="other" spent.amends="0" type="schedule"><no>Schedule 1</no><heading guid="_8c41c9d0-6ca2-4290-a2bb-164f2355a14e" id="sch.1-he">Decisions subject to appeal</heading><sourceref affected.by.uncommenced="0" guid="_a8ebb36a-05ae-49ad-be03-55cbb236af8d" id="sch.1-ref"><intref check="valid" refid="sec.395" target.guid="_9afc7be7-8e98-4cca-9761-7aa32e8da8d8">section 395</intref><intref check="valid" refid="sec.395-ssec.1" target.guid="_217ad84e-df19-48c6-9a91-b010d6e9e90c">(1)</intref></sourceref><block><table colsep="0" font.size="12.pt" frame="none" guid="_0f3e6177-007e-49bb-8631-7a8e784bc932" heading.align="left" id="sch.1-tbl" orient="port" rowsep="0"><tgroup cols="2" colsep="0" rowsep="0" tgroupstyle="2columnUnRuled"><colspec colname="1" colnum="1" colsep="0" colwidth="1.101in"/><colspec colname="2" colnum="2" colsep="0" colwidth="3.899in"/><thead><row guid="_62636e28-d749-49d9-92fa-05ed27bdebc5" id="sch.1-tbl-tblh-tblr" rowsep="0"><entry align="left" colname="1" guid="_f27ddd0b-66c0-4d5d-baee-212b78668d61" id="sch.1-tbl-tblh-tblr-tble1" valign="top"><block><txt break.before="1"><b>Section reference</b></txt></block></entry><entry align="left" colname="2" guid="_3a600f6e-b89f-4337-b07f-5437339fd37c" id="sch.1-tbl-tblh-tblr-tble2" valign="top"><block><txt break.before="1"><b>Description of decision</b></txt></block></entry></row></thead><tbody><row guid="_9cc4b5bc-ee77-49d7-854f-339b36e75162" id="sch.1-tbl-tblr" rowsep="0"><entry align="left" guid="_d7f51788-d507-4d88-adb8-7a883971c382" id="sch.1-tbl-tblr-tble1" nameend="2" namest="1" valign="top"><block><txt break.before="1"><b>GHG permits</b></txt></block></entry></row><row guid="_0e38c8a6-e65b-464f-8381-ed9a55547094" id="sch.1-tbl-tblr-oc.2" rowsep="0"><entry align="left" colname="1" guid="_8870fe0f-d33e-4eaf-b9ff-bf0dca53c686" id="sch.1-tbl-tblr-oc.2-tble1" valign="top"><block><txt break.before="1">64</txt></block></entry><entry align="left" colname="2" guid="_280182cf-6f66-4ec9-bb6d-73ad55047e5b" id="sch.1-tbl-tblr-oc.2-tble2" valign="top"><block><txt break.before="1">refusal to approve proposed later work program</txt></block></entry></row><row guid="_2a0aa8a0-6722-4fb8-85fb-cf6c24541ef0" id="sch.1-tbl-tblr-oc.3" rowsep="0"><entry align="left" colname="1" guid="_0eee09a6-3bf8-437f-b48a-d8b3d11f6cb9" id="sch.1-tbl-tblr-oc.3-tble1" valign="top"><block><txt break.before="1">69</txt></block></entry><entry align="left" colname="2" guid="_ac407fff-74ed-46ed-95de-528a08755127" id="sch.1-tbl-tblr-oc.3-tble2" valign="top"><block><txt break.before="1">refusal to approve amendment to work program</txt></block></entry></row><row guid="_dabdd5b5-6865-4dab-9994-a428644e11f4" id="sch.1-tbl-tblr-oc.4" rowsep="0"><entry align="left" colname="1" guid="_79aa8764-4d2b-47a7-834b-6b75e6b251c1" id="sch.1-tbl-tblr-oc.4-tble1" valign="top"><block><txt break.before="1">69</txt></block></entry><entry align="left" colname="2" guid="_357acbf9-97b9-43f9-9959-d6eb408a8995" id="sch.1-tbl-tblr-oc.4-tble2" valign="top"><block><txt break.before="1">imposition of condition about relinquishment for amendment to work program</txt></block></entry></row><row guid="_8d982154-dce2-4c64-b3b9-641e5002344a" id="sch.1-tbl-tblr-oc.5" rowsep="0"><entry align="left" colname="1" guid="_725ddc78-b519-4f9d-9619-c800035d6917" id="sch.1-tbl-tblr-oc.5-tble1" valign="top"><block><txt break.before="1">80</txt></block></entry><entry align="left" colname="2" guid="_f9f2179d-bf72-4e07-b79d-e43f8cb7a42c" id="sch.1-tbl-tblr-oc.5-tble2" valign="top"><block><txt break.before="1">refusal to approve proposed test plan</txt></block></entry></row><row guid="_8d90e3c2-0349-494a-84e7-8cb61e783803" id="sch.1-tbl-tblr-oc.6" rowsep="0"><entry align="left" colname="1" guid="_e3024ba8-45d6-4915-b2a0-cb36a9d9cff4" id="sch.1-tbl-tblr-oc.6-tble1" valign="top"><block><txt break.before="1">80</txt></block></entry><entry align="left" colname="2" guid="_6463e14f-91a8-490e-b83a-06ceaae32331" id="sch.1-tbl-tblr-oc.6-tble2" valign="top"><block><txt break.before="1">decision to impose condition on proposed test plan</txt></block></entry></row><row guid="_90e0a5b0-380e-405e-93e9-751f318d36e1" id="sch.1-tbl-tblr-oc.7" rowsep="0"><entry align="left" colname="1" guid="_b4f0a886-565d-4585-9ad6-0ce3aabbf3b8" id="sch.1-tbl-tblr-oc.7-tble1" valign="top"><block><txt break.before="1">96</txt></block></entry><entry align="left" colname="2" guid="_e3cf5e44-2db1-4a48-97d4-ab1203de953c" id="sch.1-tbl-tblr-oc.7-tble2" valign="top"><block><txt break.before="1">refusal to renew GHG permit</txt></block></entry></row><row guid="_a738e232-9b57-44b8-a340-5149530fb3d9" id="sch.1-tbl-tblr-oc.8" rowsep="0"><entry align="left" colname="1" guid="_60aab403-a032-4fe4-bac3-d186b7f52334" id="sch.1-tbl-tblr-oc.8-tble1" valign="top"><block><txt break.before="1">102</txt></block></entry><entry align="left" colname="2" guid="_2343d8ba-a5c4-450c-8d70-c931891a692c" id="sch.1-tbl-tblr-oc.8-tble2" valign="top"><block><txt break.before="1">refusal of application for declaration of potential storage area</txt></block></entry></row><row guid="_f7cbd806-7c6a-4859-a28f-f34afa39b488" id="sch.1-tbl-tblr-oc.9" rowsep="0"><entry align="left" colname="1" guid="_fd097808-4885-446b-b3be-dc330a228289" id="sch.1-tbl-tblr-oc.9-tble1" valign="top"><block><txt break.before="1">108</txt></block></entry><entry align="left" colname="2" guid="_acb39cf2-24a1-42f4-9e0d-0a42882cf894" id="sch.1-tbl-tblr-oc.9-tble2" valign="top"><block><txt break.before="1">decision to take proposed action under <intref check="valid" refid="sec.107" target.guid="_5bbc34d2-02ef-4e7f-902f-3df1f918603c">section 107</intref> for GHG permit</txt></block></entry></row><row guid="_f73ca7d1-5460-4fe1-a091-c84ee99b2340" id="sch.1-tbl-tblr-oc.10" rowsep="0"><entry align="left" colname="1" guid="_ef4eb764-ba7e-40e1-b384-58f9e1f29563" id="sch.1-tbl-tblr-oc.10-tble1" valign="top"/><entry align="left" colname="2" guid="_34f6de36-07fa-4ca7-bbb8-777ecdf45a10" id="sch.1-tbl-tblr-oc.10-tble2" valign="top"/></row><row guid="_9a998adc-7a9b-413e-b8a9-1457a845e9a0" id="sch.1-tbl-tblr-oc.11" rowsep="0"><entry align="left" guid="_c35fa72c-039d-46fd-9f6f-d492f8318234" id="sch.1-tbl-tblr-oc.11-tble1" nameend="2" namest="1" valign="top"><block><txt break.before="1"><b>GHG leases</b></txt></block></entry></row><row guid="_89a5e17a-86b2-4b18-8790-e95e4d85aa86" id="sch.1-tbl-tblr-oc.12" rowsep="0"><entry align="left" colname="1" guid="_e96592f8-c0f4-4f05-8650-263cf583ddb5" id="sch.1-tbl-tblr-oc.12-tble1" valign="top"><block><txt break.before="1">117</txt></block></entry><entry align="left" colname="2" guid="_00062eae-bf1c-4454-b525-2a749e032cb1" id="sch.1-tbl-tblr-oc.12-tble2" valign="top"><block><txt break.before="1">decision not to grant a GHG lease on ATP-related application</txt></block></entry></row><row guid="_c328d98a-693a-4258-a329-4bcedadf1ea1" id="sch.1-tbl-tblr-oc.13" rowsep="0"><entry align="left" colname="1" guid="_41c73310-81ce-417d-9959-4e06079d04e3" id="sch.1-tbl-tblr-oc.13-tble1" valign="top"><block><txt break.before="1">154</txt></block></entry><entry align="left" colname="2" guid="_a31e3983-68a7-48ab-977e-d4bdff9e1fd1" id="sch.1-tbl-tblr-oc.13-tble2" valign="top"><block><txt break.before="1">refusal to approve proposed later development plan</txt></block></entry></row><row guid="_77984a46-5c8e-4773-9e24-b897484bb1d2" id="sch.1-tbl-tblr-oc.14" rowsep="0"><entry align="left" colname="1" guid="_8380761e-2d7a-4f10-9c47-716002fbff03" id="sch.1-tbl-tblr-oc.14-tble1" valign="top"><block><txt break.before="1">158</txt></block></entry><entry align="left" colname="2" guid="_78b8d63b-8b84-4349-b44e-b7a29246314d" id="sch.1-tbl-tblr-oc.14-tble2" valign="top"><block><txt break.before="1">refusal to approve amendment to development plan</txt></block></entry></row><row guid="_99c7a5fb-e039-4344-bcae-d05eccce334f" id="sch.1-tbl-tblr-oc.15" rowsep="0"><entry align="left" colname="1" guid="_82c3c1eb-340d-4e42-9f0f-000fb1c72e2e" id="sch.1-tbl-tblr-oc.15-tble1" valign="top"><block><txt break.before="1">161</txt></block></entry><entry align="left" colname="2" guid="_f2fa0c73-870c-4071-80c2-c575a0466ee2" id="sch.1-tbl-tblr-oc.15-tble2" valign="top"><block><txt break.before="1">refusal to approve proposed test plan</txt></block></entry></row><row guid="_30a0ff8c-a8fe-45c6-ada5-3b2deab7b7a6" id="sch.1-tbl-tblr-oc.16" rowsep="0"><entry align="left" colname="1" guid="_34d7d31d-35a9-4a32-908b-d6352cb8eeb9" id="sch.1-tbl-tblr-oc.16-tble1" valign="top"><block><txt break.before="1">161</txt></block></entry><entry align="left" colname="2" guid="_1954ffdd-9732-4741-ace6-849045a5b91c" id="sch.1-tbl-tblr-oc.16-tble2" valign="top"><block><txt break.before="1">decision to impose condition on proposed test plan</txt></block></entry></row><row guid="_5a0b0019-979a-42b7-af29-51891855bb2a" id="sch.1-tbl-tblr-oc.17" rowsep="0"><entry align="left" colname="1" guid="_ab726681-3222-470c-89cc-21fe6015aaaa" id="sch.1-tbl-tblr-oc.17-tble1" valign="top"><block><txt break.before="1">179</txt></block></entry><entry align="left" colname="2" guid="_0864d317-d8d3-4f26-9e31-e28bf3fd7ddf" id="sch.1-tbl-tblr-oc.17-tble2" valign="top"><block><txt break.before="1">refusal to approve surrender of GHG lease</txt></block></entry></row><row guid="_61fb4076-d101-4921-99e6-8f3eed1d972a" id="sch.1-tbl-tblr-oc.18" rowsep="0"><entry align="left" guid="_f0d5780a-2f63-4770-874f-909620752faa" id="sch.1-tbl-tblr-oc.18-tble1" nameend="2" namest="1" valign="top"><block><txt break.before="1"><b>GHG coordination arrangements</b></txt></block></entry></row><row guid="_1f3ad7f2-581b-4e39-8e2e-4af92a52b81d" id="sch.1-tbl-tblr-oc.19" rowsep="0"><entry align="left" colname="1" guid="_968141bd-8fbf-4e1d-91e9-034f12ad6f1d" id="sch.1-tbl-tblr-oc.19-tble1" valign="top"><block><txt break.before="1">193</txt></block></entry><entry align="left" colname="2" guid="_f54ad6dc-505e-42e9-b1a1-308e6e5d4357" id="sch.1-tbl-tblr-oc.19-tble2" valign="top"><block><txt break.before="1">cancellation of GHG coordination arrangement</txt></block></entry></row><row guid="_3dd89d73-5a85-4b8f-9f6f-9f8096e9ddfd" id="sch.1-tbl-tblr-oc.20" rowsep="0"><entry align="left" colname="1" guid="_82c42230-75f2-47d6-8fbd-790f58e2483e" id="sch.1-tbl-tblr-oc.20-tble1" valign="top"/><entry align="left" colname="2" guid="_1ebd0c26-0f4d-44d5-8065-ff99b2d74f92" id="sch.1-tbl-tblr-oc.20-tble2" valign="top"/></row><row guid="_15faf53f-415a-4db7-b694-c524f27e5154" id="sch.1-tbl-tblr-oc.21" rowsep="0"><entry align="left" guid="_54c2ffc8-0e1a-428b-b7aa-ed53c8cead24" id="sch.1-tbl-tblr-oc.21-tble1" nameend="2" namest="1" valign="top"><block><txt break.before="1"><b>Decisions under <intref check="valid" refid="ch.5" target.guid="_c200371d-7276-455f-ab31-e74d811368e1">chapter 5</intref></b></txt></block></entry></row><row guid="_9f379744-80dd-4d65-b5b2-c6d3df79b98d" id="sch.1-tbl-tblr-oc.22" rowsep="0"><entry align="left" colname="1" guid="_d1d7fcf0-51eb-4adc-8f0f-af418071ad8c" id="sch.1-tbl-tblr-oc.22-tble1" valign="top"><block><txt break.before="1">271</txt></block></entry><entry align="left" colname="2" guid="_7314a9b5-1e04-4f76-b845-b3d49781ac3f" id="sch.1-tbl-tblr-oc.22-tble2" valign="top"><block><txt break.before="1">decision to require security for GHG authority other than security in the form and amount prescribed under <intref check="valid" refid="sec.271" target.guid="_189844e5-1f2b-472b-a0aa-286d65029d9a">section 271</intref><intref check="valid" refid="sec.271-ssec.2" target.guid="_95d7e411-53de-430e-878e-ccfc536db2b2">(2)</intref></txt></block></entry></row><row guid="_109167cd-1639-41db-aaca-7c4a10141714" id="sch.1-tbl-tblr-oc.23" rowsep="0"><entry align="left" colname="1" guid="_6066f5c1-c9de-4f21-a1a2-de01814648a4" id="sch.1-tbl-tblr-oc.23-tble1" valign="top"><block><txt break.before="1">272</txt></block></entry><entry align="left" colname="2" guid="_318e3071-20fc-4657-83e5-57a010629498" id="sch.1-tbl-tblr-oc.23-tble2" valign="top"><block><txt break.before="1">decision to require increase in total security required to more than the prescribed amount under <intref check="valid" refid="sec.271" target.guid="_189844e5-1f2b-472b-a0aa-286d65029d9a">section 271</intref><intref check="valid" refid="sec.271-ssec.2" target.guid="_95d7e411-53de-430e-878e-ccfc536db2b2">(2)</intref> when the requirement is made</txt></block></entry></row><row guid="_a7027372-092b-45e6-b176-b55aa6270cd4" id="sch.1-tbl-tblr-oc.24" rowsep="0"><entry align="left" colname="1" guid="_fc5029a9-30ab-4d81-a2d2-4c600dc0cfaf" id="sch.1-tbl-tblr-oc.24-tble1" valign="top"><block><txt break.before="1">364</txt></block></entry><entry align="left" colname="2" guid="_059ced1e-e6c8-49fd-90a2-9d7beb42ecae" id="sch.1-tbl-tblr-oc.24-tble2" valign="top"><block><txt break.before="1">decision to give a serious situation direction</txt></block></entry></row><row guid="_a1b83697-3660-4609-85a8-e3c3056b859a" id="sch.1-tbl-tblr-oc.25" rowsep="0"><entry align="left" colname="1" guid="_43737d8b-40e2-4087-9ee9-a1841bcdaff6" id="sch.1-tbl-tblr-oc.25-tble1" valign="top"><block><txt break.before="1">371</txt></block></entry><entry align="left" colname="2" guid="_5357e262-2126-47a6-a53a-df5336f5247a" id="sch.1-tbl-tblr-oc.25-tble2" valign="top"><block><txt break.before="1">decision to take action to ensure compliance with a requirement under this Act of a GHG authority holder other than action to which the holder has agreed</txt></block></entry></row><row guid="_8123bac8-ce9e-42a7-ba43-abefb5fed1f5" id="sch.1-tbl-tblr-oc.26" rowsep="0"><entry align="left" colname="1" guid="_1f04569f-131e-4813-ac1d-9e2d0c68b8aa" id="sch.1-tbl-tblr-oc.26-tble1" valign="top"/><entry align="left" colname="2" guid="_27649b3d-8b1c-450c-b879-86f0613ebbe5" id="sch.1-tbl-tblr-oc.26-tble2" valign="top"/></row><row guid="_bb963b7b-5a7f-4288-b6c2-eaad958ead24" id="sch.1-tbl-tblr-oc.27" rowsep="0"><entry align="left" guid="_a4d4ac9b-458c-4642-aa30-bee187e5f196" id="sch.1-tbl-tblr-oc.27-tble1" nameend="2" namest="1" valign="top"><block><txt break.before="1"><b>Noncompliance action</b></txt></block></entry></row><row guid="_7959e185-07dd-4d28-a49c-cd5803fff904" id="sch.1-tbl-tblr-oc.28" rowsep="0"><entry align="left" colname="1" guid="_d1bdc609-0104-42bf-a568-44ae30ab6adc" id="sch.1-tbl-tblr-oc.28-tble1" valign="top"><block><txt break.before="1">383</txt></block></entry><entry align="left" colname="2" guid="_258e4566-0cf6-4148-98bf-a2eeccb42e74" id="sch.1-tbl-tblr-oc.28-tble2" valign="top"><block><txt break.before="1">decision to take noncompliance action for GHG authority</txt></block></entry></row><row guid="_54ab258f-672a-4ed5-8ba9-9bfeb12adb36" id="sch.1-tbl-tblr-oc.29" rowsep="0"><entry colname="1" guid="_723bb422-1dd3-482f-a587-4c2c61c4812b" id="sch.1-tbl-tblr-oc.29-tble1"/><entry colname="2" guid="_e24b6278-5b2a-4ff8-968c-ea419c5e0aee" id="sch.1-tbl-tblr-oc.29-tble2"/></row><row guid="_aa9e6cfa-8950-4d4d-a217-676d60628ce7" id="sch.1-tbl-tblr-oc.30" rowsep="0"><entry guid="_5bb5c41e-ce4e-43fe-a79c-f376fb662365" id="sch.1-tbl-tblr-oc.30-tble1" nameend="2" namest="1"><block><txt break.before="1"><b>Decisions under <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref></b></txt></block></entry></row><row guid="_66ee5871-c876-490c-aed2-05efea699da3" id="sch.1-tbl-tblr-oc.31" rowsep="0"><entry colname="1" guid="_33188efa-f646-41d8-858a-d3083ae591b1" id="sch.1-tbl-tblr-oc.31-tble1"><block><txt break.before="1">19(<del xml:space="preserve">3</del><ins xml:space="preserve">2</ins>)</txt></block></entry><entry colname="2" guid="_d6c26cdc-770d-43b5-bcb5-3c87711ae0f6" id="sch.1-tbl-tblr-oc.31-tble2"><block><txt break.before="1">decision to refuse to approve registration of a dealing, or to approve <del xml:space="preserve">registration of a</del><ins xml:space="preserve">a prescribed</ins> dealing with conditions</txt></block></entry></row><row guid="_bbc5a468-3288-4e35-a3e7-6bfd91ad9c9e" id="sch.1-tbl-tblr-oc.32" rowsep="0"><entry colname="1" guid="_b2e086ee-527b-4c74-8479-113446b24fce" id="sch.1-tbl-tblr-oc.32-tble1"><block><txt break.before="1">23(3)</txt></block></entry><entry colname="2" guid="_fa7495bd-7b3b-4a48-bf71-d785e67dcb40" id="sch.1-tbl-tblr-oc.32-tble2"><block><txt break.before="1">decision to refuse to give indicative approval, or to give indicative approval with conditions</txt></block></entry></row><row guid="_1f0d9fbe-543c-4063-8ba2-02e8dddd80ca" id="sch.1-tbl-tblr-oc.33" rowsep="0"><entry colname="1" guid="_8b8e1ddc-9a85-46e5-99f3-e519aee9daf2" id="sch.1-tbl-tblr-oc.33-tble1"><block><txt break.before="1">59(2)</txt></block></entry><entry colname="2" guid="_487f059a-b7f7-4950-aef6-3c412baa44e4" id="sch.1-tbl-tblr-oc.33-tble2"><block><txt break.before="1">imposition of condition on entry on public land, other than a condition agreed to or requested by the relevant GHG authority holder</txt></block></entry></row><row guid="_cf3e5163-1eb3-40b1-9e81-a3485b50e12a" id="sch.1-tbl-tblr-oc.34" rowsep="0"><entry colname="1" guid="_5b63a310-3a7a-4790-ad28-a07120656e20" id="sch.1-tbl-tblr-oc.34-tble1"><block><txt break.before="1">59(7)</txt></block></entry><entry colname="2" guid="_56eaee47-d6f9-46a0-be93-dd00c4dac63f" id="sch.1-tbl-tblr-oc.34-tble2"><block><txt break.before="1">variation of condition imposed on entry on public land, other than a variation agreed to or requested by the relevant GHG authority holder</txt></block></entry></row><row guid="_1b386f6f-0a1b-4cd6-ba96-e13a734b81de" id="sch.1-tbl-tblr-oc.35" rowsep="0"><entry colname="1" guid="_56c5cb7f-8468-478c-a484-d82b94e03fb5" id="sch.1-tbl-tblr-oc.35-tble1"><block><txt break.before="1">64(1)</txt></block></entry><entry colname="2" guid="_c2db27eb-60c1-4643-93e6-7144aebbe372" id="sch.1-tbl-tblr-oc.35-tble2"><block><txt break.before="1">decision to give road use direction</txt></block></entry></row></tbody></tgroup></table></block></schedule><schedule affected.by.uncommenced="0" guid="_701bbbe5-2cf2-45ee-ab66-e29d63e627ef" id="sch.2" numbering.style="manual" provision.type="other" spent.amends="0" type="schedule"><no>Schedule 2</no><heading guid="_54859b2c-aca2-4095-b188-3f03b6353028" id="sch.2-he">Dictionary</heading><sourceref affected.by.uncommenced="0" guid="_3a89960e-29a5-4c03-8bc8-8a429532fafd" id="sch.2-ref"><intref check="valid" refid="sec.11" target.guid="_2d2cce29-ef0c-4714-8765-78d3faa9db27">section 11</intref></sourceref><block><deflist><definition affected.by.uncommenced="0" guid="_ef1340ab-c50b-414b-a9f5-09f14000daa9" id="sch.2-def.1923Act_"><txt break.before="1"><defterm guid="_48410ff3-042d-4cb4-b85b-8c93edbac7bb" id="sch.2-def.1923Act" type="definition">1923 Act</defterm> means the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="yes">Petroleum Act 1923</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_ec453d41-7d59-4efa-957e-3a528ed5442d" id="sch.2-def.1923Actpetroleumtenure_"><txt break.before="1"><defterm guid="_6b2c3f39-c8dc-449b-8a47-eb8d6b48bda8" id="sch.2-def.1923Actpetroleumtenure" type="definition">1923 Act petroleum tenure</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.2" target.doc.id="act-1923-026" target.guid="_acca7544-3e5c-40a8-911e-990669e0b12a" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act">section 2</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_007887c1-28fc-4d12-be78-bbb7aed1bf68" id="sch.2-def.accessagreement_"><txt break.before="1"><defterm guid="_d8ffddfd-11f7-44d4-9ea2-d2d77866d63e" id="sch.2-def.accessagreement" type="definition">access agreement</defterm> see <intref check="valid" refid="sec.288" target.guid="_541b5e72-9b36-459d-b6c4-50c48082edce">section 288</intref><intref check="invalid" refid="sec.288-ssec.2">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_a4f1bab0-3313-4bce-81f6-fc0a9fa8dd3b" id="sch.2-def.accessland_"><txt break.before="1"><defterm guid="_bd60d208-ae31-4c2b-8931-f42bd53728d0" id="sch.2-def.accessland" type="definition">access land</defterm>, for a GHG authority, see <intref check="valid" refid="sec.287" target.guid="_98039a3d-cc20-4ee1-ab4a-9d5dee279c1e">section 287</intref><intref check="invalid" refid="sec.287-ssec.3">(3)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_c8a52846-33cc-4a84-9fc7-63ebc139a78a" id="sch.2-def.accessrights_"><txt break.before="1"><defterm guid="_ce54d671-6bfc-4210-b9ed-6c5329fec438" id="sch.2-def.accessrights" type="definition">access rights</defterm> see <intref check="valid" refid="sec.287" target.guid="_98039a3d-cc20-4ee1-ab4a-9d5dee279c1e">section 287</intref><intref check="invalid" refid="sec.287-ssec.2">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_3d13d9cf-a2d8-49d2-95ed-8d14edf2372e" id="sch.2-def.acquiredland_"><txt break.before="1"><defterm guid="_965fc15f-485d-4679-9242-3435c256d07a" id="sch.2-def.acquiredland" type="definition">acquired land</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f0acd306-ba4f-445f-805a-a5d3aa578de2" id="sch.2-def.acquiredland-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">Land is <defterm guid="_2d5f6921-60d4-4af0-8e96-b7a5ffa73f74" type="mention">acquired land</defterm> if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6497b645-aa1d-424e-9ff6-4571b1e6c61e" id="sch.2-def.acquiredland-para1.1-para2.a" provision.type="other"><no>(a)</no><block><txt break.before="0">it was taken under a resumption law, other than by taking or otherwise creating an easement; and</txt></block></li><li guid="_5288f43e-df9f-4336-98a7-a3f698d4d26a" id="sch.2-def.acquiredland-para1.1-para2.b" provision.type="other"><no>(b)</no><block><txt break.before="0">under <intref check="valid" refid="sec.369A" target.guid="_2c168c8a-2d76-44af-b984-114e40e603bd">section 369A</intref>, all GHG interests relating to the land were extinguished on the taking.</txt></block></li></list></block></li><li guid="_2a7001ea-98e3-40e0-bf62-a2c249a265a9" id="sch.2-def.acquiredland-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">However, land mentioned in paragraph 1 stops being <defterm guid="_61265c7e-1116-4a9a-8f94-7395a41136ea" type="mention">acquired land</defterm> if it is included in the area of a new or renewed GHG tenure granted under this Act.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_4e1afdde-cfe7-481b-9a01-02c6ff7b414e" id="sch.2-def.ALA_"><txt break.before="1"><defterm guid="_734509af-e256-4453-ae0e-aa285838a933" id="sch.2-def.ALA" type="definition">ALA </defterm>means the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="yes">Acquisition of Land Act 1967.</name></legref></txt></definition><definition affected.by.uncommenced="0" guid="_fd9fdfb9-a4f8-4f97-93eb-b2d7dc400398" id="sch.2-def.appealperiod_"><txt break.before="1"><defterm guid="_0d939930-0d99-4ae9-8034-78ad9ccfd223" id="sch.2-def.appealperiod" type="definition">appeal period</defterm>, for a decision, means the period provided for under <intref check="valid" refid="sec.396" target.guid="_24687ac2-2ef4-4827-b9da-eb093481d185">section 396</intref> for starting an appeal against the decision.</txt></definition><definition affected.by.uncommenced="0" guid="_567070c5-0b0f-42d1-bfc5-dfc316b96148" id="sch.2-def.applicant_"><txt break.before="1"><defterm guid="_e8d3fbf6-622a-4fc8-84cc-87a69295aa6b" id="sch.2-def.applicant" type="definition">applicant</defterm>, for <intref check="valid" refid="ch.4" target.guid="_faefc638-342e-43b0-a5ed-6ae7a9f9a690">chapter 4</intref>, <intref check="valid" refid="ch.4-pt.3" target.guid="_9da70cbb-53b7-46ce-989e-04b5bd228a9b">part 3</intref>, see <intref check="valid" refid="sec.195" target.guid="_45bd3289-a39f-4471-b560-141fcea25750">section 195</intref><intref check="valid" refid="sec.195-para1.a" target.guid="_e4e25d23-25c6-4c44-aed2-a35b446443cb">(a)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_3f9cd738-365d-443a-ab4d-ff57be96001e" id="sch.2-def.application_"><txt break.before="1"><defterm guid="_514d9c0f-3baa-4aee-8459-f54075de4531" id="sch.2-def.application" type="definition">application</defterm> includes a tender in response to a call for tenders.</txt></definition><definition affected.by.uncommenced="0" guid="_b54e75f9-b7c8-4852-836d-aa41a24205c0" id="sch.2-def.apply_"><txt break.before="1"><defterm guid="_2b82b4cd-9830-4e00-af1e-577e1885e0ae" id="sch.2-def.apply" type="definition">apply</defterm>, in relation to making an application, has the meaning affected by <intref check="valid" refid="sec.411" target.guid="_1563d9ac-bd31-449e-842a-931b0e660c2b">section 411</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_f00f256a-b34c-4c5c-ad29-9668c2fb1a23" id="sch.2-def.appropriatelyqualified_"><txt break.before="1"><defterm guid="_5f6a62a5-806e-44a0-a03d-53c97237c40b" id="sch.2-def.appropriatelyqualified" type="definition">appropriately qualified</defterm>, for the performance of a function or exercise of a power, includes having the qualifications, experience and competence to perform the function or exercise the power.</txt></definition><definition affected.by.uncommenced="0" guid="_caf6a54d-1a26-411c-bfe5-68efdd9942b2" id="sch.2-def.approvedform_"><txt break.before="1"><defterm guid="_d21e8911-59c5-427d-904d-6d1045fa7e27" id="sch.2-def.approvedform" type="definition">approved form</defterm> means the form approved under <intref check="valid" refid="sec.428" target.guid="_1dffc2de-5a2c-4887-901c-ca5f24022f96">section 428</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_9276a263-7d88-46b7-b93f-b9e6ac9085c1" id="sch.2-def.area_"><txt break.before="1"><defterm guid="_e36ae510-5396-4339-b616-aa7da58cc1b1" id="sch.2-def.area" type="definition">area</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fc8dc95b-2bbe-486a-9712-b89ff846b0a1" id="sch.2-def.area-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">The <defterm guid="_ca2b55ff-432c-4168-82fa-bdecd97be412" type="mention">area</defterm>, of a GHG authority, is the land to which the authority is subject as recorded in the register.</txt></block></li><li guid="_c50e31dc-bb21-4b81-ad2b-a22e7c6e6b4e" id="sch.2-def.area-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">The <defterm guid="_24df7245-a46e-4ac9-afa2-2bfc8aa3a9e5" type="mention">area</defterm> of an authority, tenement or tenure granted under another resource Act is its area as defined under that Act or the area to which the authority, tenement or tenure is subject under that Act.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_1032f7f1-3968-43f8-bc62-67690728e153" id="sch.2-def.ATP_"><txt break.before="1"><defterm guid="_a4c68f4d-f924-44f0-83f1-1eb176413f64" id="sch.2-def.ATP" type="definition">ATP</defterm> means an authority to prospect.</txt></definition><definition affected.by.uncommenced="0" guid="_52d08fa2-7a0e-4c5d-8814-d28c410176f3" id="sch.2-def.authorisedactivity_"><txt break.before="1"><defterm guid="_7954563a-43fc-45f2-aca4-a1e098f46ec0" id="sch.2-def.authorisedactivity" type="definition">authorised activity</defterm>, for a GHG authority, see <intref check="valid" refid="sec.22" target.guid="_f5e8f03f-14b6-4884-a12b-43bc87e358d7">section 22</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_7c4ddc42-29ad-44a7-86ae-3906aa37ad6e" id="sch.2-def.authoritytoprospect_"><txt break.before="1"><defterm guid="_bbcbf521-da82-41ba-9ed4-44145a1c3c85" id="sch.2-def.authoritytoprospect" type="definition">authority to prospect</defterm> means an authority to prospect under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> or the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_e6850e40-3ba1-4efc-a2a2-800c9926e8af" id="sch.2-def.block_"><txt break.before="1"><defterm guid="_5c24f8c5-ecd4-47e0-8a03-036ecd2b19c9" id="sch.2-def.block" type="definition">block</defterm> see <intref check="valid" refid="sec.26" target.guid="_51d5ebcf-f335-44c2-a05e-f563ea9a4e7f">section 26</intref><intref check="valid" refid="sec.26-ssec.1" target.guid="_f8891c89-db8a-4c2f-a92d-19348eada766">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_a73f4122-1d6b-49c9-93cc-29fa107462a8" id="sch.2-def.callfortenders_"><txt break.before="1"><defterm guid="_74b0509d-1da0-4ad2-b74f-3f7f72f82bc3" id="sch.2-def.callfortenders" type="definition">call for tenders</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_eb91387d-69e3-48cf-98c0-e8a9b6f06195" id="sch.2-def.callfortenders-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for <intref check="valid" refid="ch.2" target.guid="_60f42d8e-8fdb-4c76-a1e6-d0c7ad27b9d4">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.2" target.guid="_7f976c7a-8d1f-43eb-b00e-acc633d1e46b">part 2</intref>—see <intref check="valid" refid="sec.33" target.guid="_f0ad3da8-2ce3-40a0-b87b-acd049d31664">section 33</intref><intref check="valid" refid="sec.33-ssec.1" target.guid="_5aa8701b-3fc8-47b5-9d28-9dfddbadf646">(1)</intref>; or</txt></block></li><li guid="_5c83e738-fad1-4031-8276-0e9027232bc0" id="sch.2-def.callfortenders-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for <intref check="valid" refid="ch.3" target.guid="_4c6bae05-4d64-4dbf-a4f3-a2736db63437">chapter 3</intref>, <intref check="valid" refid="ch.3-pt.3" target.guid="_5bc6ff2c-a6de-4945-b5ae-e6bee6baef5e">part 3</intref>—see <intref check="valid" refid="sec.125" target.guid="_18a4cbb6-460e-491a-af4e-66cfb9a26f90">section 125</intref><intref check="valid" refid="sec.125-ssec.1" target.guid="_d1805e99-a8fa-462a-9801-80ff7fa234b9">(1)</intref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_993ed510-5be6-4f12-a79e-ccf477072142" id="sch.2-def.capabilitycriteria_"><txt break.before="1"><defterm guid="_38ae8b48-0cff-43be-bd01-88769709997e" id="sch.2-def.capabilitycriteria" type="definition">capability criteria</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ea497c0e-7a92-446c-b194-b5018a55c0bb" id="sch.2-def.capabilitycriteria-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for <intref check="valid" refid="ch.2" target.guid="_60f42d8e-8fdb-4c76-a1e6-d0c7ad27b9d4">chapter 2</intref>—see <intref check="valid" refid="sec.42" target.guid="_c1ff0b2d-2444-49b4-929f-0ed640ee415a">section 42</intref><intref check="valid" refid="sec.42-ssec.2" target.guid="_2f6108f1-7dda-4804-bdd2-55a47f6395c8">(2)</intref>; or</txt></block></li><li guid="_34aa965a-baff-4212-bead-61957c7c65fd" id="sch.2-def.capabilitycriteria-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for <intref check="valid" refid="ch.3" target.guid="_4c6bae05-4d64-4dbf-a4f3-a2736db63437">chapter 3</intref>—see <intref check="valid" refid="sec.118" target.guid="_caba8768-e566-46e2-9665-a52878db55fc">section 118</intref><intref check="valid" refid="sec.118-ssec.2" target.guid="_de931c9c-764c-4c8f-9360-e138dc5ef263">(2)</intref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_85bd47d9-1127-4db5-b1d0-c73e8f54f9a6" id="sch.2-def.closingtime_"><txt break.before="1"><defterm guid="_bf3924cd-c07c-4924-869f-e1c37d019a96" id="sch.2-def.closingtime" type="definition">closing time</defterm>, for a call for tenders—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1d6f6ced-051e-4c1c-a204-5681e77ccabe" id="sch.2-def.closingtime-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for a GHG permit—see <intref check="valid" refid="sec.33" target.guid="_f0ad3da8-2ce3-40a0-b87b-acd049d31664">section 33</intref><intref check="valid" refid="sec.33-ssec.2" target.guid="_7d636d93-6fe1-4eb6-8137-69b5204d12c1">(2)</intref><intref check="valid" refid="sec.33-ssec.2-para1.a" target.guid="_53e321c5-beb0-4a23-8ef3-2636357577ac">(a)</intref>; or</txt></block></li><li guid="_a50444d3-bed2-4b8c-86c1-9beef0b178e9" id="sch.2-def.closingtime-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for a GHG lease—see <intref check="valid" refid="sec.125" target.guid="_18a4cbb6-460e-491a-af4e-66cfb9a26f90">section 125</intref><intref check="valid" refid="sec.125-ssec.2" target.guid="_ee55496a-de9b-4c62-9842-25dd11aae18b">(2)</intref><intref check="valid" refid="sec.125-ssec.2-para1.a" target.guid="_fbdbe538-b891-404b-b1b1-c966dc8c6b44">(a)</intref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_6e744c08-0362-4a0f-a802-4ed93db74e39" id="sch.2-def.CommonProvisionsAct_"><txt break.before="1"><defterm guid="_544fa15e-2d59-40c8-b5d3-7bc39f6682d8" id="sch.2-def.CommonProvisionsAct" type="definition">Common Provisions Act</defterm> means the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="yes">Mineral and Energy Resources (Common Provisions) Act 2014</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_9316403c-1775-4edd-b1e1-b7eed9bedc1d" id="sch.2-def.compensationliability_"><txt break.before="1"><defterm guid="_7f38fbcf-e9e4-45f4-b12b-86d4b8679127" id="sch.2-def.compensationliability" type="definition">compensation liability</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.81" target.doc.id="act-2014-047" target.guid="_a86cb34d-af6f-4d62-a426-415980d58775" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">section 81</legref><legref check="invalid" jurisd="QLD" type="act">(2)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_8acdcd10-5d7a-4db3-a052-768bd5807160" id="sch.2-def.conditions_"><txt break.before="1"><defterm guid="_62cdb01c-056f-49d8-aa15-3ad43d3b9cc6" id="sch.2-def.conditions" type="definition">conditions</defterm>, of a GHG authority, see <intref check="valid" refid="sec.20" target.guid="_6a183a3b-a88c-4f09-9eea-0fc8117ffb80">section 20</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_f278ff98-0a6a-4f58-a515-49a3d3e0a711" id="sch.2-def.conductandcompensationagreement_"><txt break.before="1"><defterm guid="_54baf2c9-a0b4-4305-bf75-201f1e46611b" id="sch.2-def.conductandcompensationagreement" type="definition">conduct and compensation agreement</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.83" target.doc.id="act-2014-047" target.guid="_b5495591-7bb8-436c-b1e9-f3f4bd9f6868" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">section 83</legref><legref check="invalid" jurisd="QLD" type="act">(1)</legref>.</txt></definition><definition affected.by.uncommenced="0" change="del" guid="_f162acd2-ea15-4356-ac6d-215901025229-del" id="sch.2-def.conferenceelectionnotice_-del"><txt break.before="1"><defterm guid="_88846cd6-aa22-4a22-bd82-8e26c51e027a-del" id="sch.2-def.conferenceelectionnotice-del" type="definition">conference election notice</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.83A" target.doc.id="act-2014-047" target.guid="_9db33894-d9c2-4a76-8924-c1558a566555" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">section 83A</legref><legref check="valid" jurisd="QLD" refid="sec.83A-ssec.2" target.doc.id="act-2014-047" target.guid="_eab53bbc-c1aa-47a2-b5c5-77eecb0891c5" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">(2)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_b01adb2e-4426-4cee-838b-7ab25a59666c" id="sch.2-def.construct_"><txt break.before="1"><defterm guid="_e7ce2fd0-bfd7-4dc7-857e-beeeabc6f480" id="sch.2-def.construct" type="definition">construct</defterm>, a structure, includes placing the structure.</txt></definition><definition affected.by.uncommenced="0" guid="_3d5a7721-e5aa-4295-a237-c49c5b796fd1" id="sch.2-def.contiguous_"><txt break.before="1"><defterm guid="_b222beef-f738-4b49-bb3f-7389fc64584d" id="sch.2-def.contiguous" type="definition">contiguous</defterm>, for land, means abutting, with at least 1 side in common.</txt></definition><definition affected.by.uncommenced="0" guid="_8e1c0615-2dfc-4e51-a7c8-1b455ed87853" id="sch.2-def.conviction_"><txt break.before="1"><defterm guid="_b89fa34b-d6ce-447f-b54f-8f69dd4b2908" id="sch.2-def.conviction" type="definition">conviction</defterm> includes a finding of guilt or the acceptance of a plea of guilty by a court, whether or not a conviction is recorded.</txt></definition><definition affected.by.uncommenced="0" guid="_1d855b3e-fca6-41a9-9000-61a8366993b4" id="sch.2-def.coordinatedproject_"><txt break.before="1"><defterm guid="_cb07045b-cfd4-4bc0-9910-4b0b99630376" id="sch.2-def.coordinatedproject" type="definition">coordinated project</defterm> means a project declared under the <legref check="valid" jurisd="QLD" target.doc.id="act-1971-055" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" type="act"><name emphasis="no">State Development Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.26" target.doc.id="act-1971-055" target.guid="_f88eb85e-bd2a-49ff-9d2d-83da4cfa8fdf" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" type="act">section 26</legref>, to be a coordinated project.</txt></definition><definition affected.by.uncommenced="0" guid="_77b983f3-51c8-41cc-8d7b-0dfc9e1e94ae" id="sch.2-def.costs_"><txt break.before="1"><defterm guid="_0fad98b6-d6a3-4d8c-a860-82de3cdec3aa" id="sch.2-def.costs" type="definition">costs</defterm>, incurred by the State, includes the cost of services that the State provides for itself.</txt></definition><definition affected.by.uncommenced="0" guid="_b0e7c185-560b-41ab-ac2e-f65d65bd7afe" id="sch.2-def.dangeroussituation_"><txt break.before="1"><defterm guid="_acdc5040-2232-4aa7-8ba0-3f7354f5640f" id="sch.2-def.dangeroussituation" type="definition">dangerous situation</defterm> means a situation relating to geothermal activity under the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref>, a GHG stream or petroleum or fuel gas in which an inspector under the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref> reasonably believes an imminent risk of material harm to persons or property is likely if action is not taken to avoid, eliminate or minimise the risk.</txt></definition><definition affected.by.uncommenced="0" guid="_ba4aff77-8536-4e6b-8a5a-b32484c1afbd" id="sch.2-def.dataacquisitionactivities_"><txt break.before="1"><defterm guid="_60499a33-720f-455a-bfe3-6a467cb7f1cd" id="sch.2-def.dataacquisitionactivities" type="definition">data acquisition activities</defterm> see <intref check="valid" refid="sec.233" target.guid="_25064f82-f49b-412a-9a07-c5c13659fe8f">section 233</intref><intref check="valid" refid="sec.233-ssec.1" target.guid="_30171cca-258b-425a-bb3c-c62dfd9c18f0">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_ee6a175b-e41a-4cca-8a15-212aacea42be" id="sch.2-def.dealing_"><txt break.before="1"><defterm guid="_680412f7-c569-4a4a-bd09-bc589708761a" id="sch.2-def.dealing" type="definition">dealing</defterm>, in relation to a GHG authority, means a dealing with a resource authority, under the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, that is a GHG authority.</txt></definition><definition affected.by.uncommenced="0" guid="_d4b88a7c-907e-429a-b57f-1a62cebfdfbe" id="sch.2-def.deferralagreement_"><txt break.before="1"><defterm guid="_3d463d8b-8972-4d7e-b4c5-4e76da0f09f9" id="sch.2-def.deferralagreement" type="definition">deferral agreement</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.44" target.doc.id="act-2014-047" target.guid="_1e94ecd4-429c-490c-99b9-2ac3fcae69a8" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">section 44</legref><legref check="invalid" jurisd="QLD" type="act">(1)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_b28a8545-a7f7-467c-b774-911175ca1db5" id="sch.2-def.developmentplan_"><txt break.before="1"><defterm guid="_537685a7-7ee5-4fcd-8d69-729ccc4ef05d" id="sch.2-def.developmentplan" type="definition">development plan</defterm>, for a GHG lease, see <intref check="valid" refid="sec.25" target.guid="_7e0d4246-901b-4fcf-86fa-428043a4985c">section 25</intref><intref check="valid" refid="sec.25-ssec.1" target.guid="_f3cd9d24-ebf7-4c1f-9473-489a3ea56f84">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_125a4554-798c-4d34-a739-02497bc8eb1d" id="sch.2-def.developmentplancriteria_"><txt break.before="1"><defterm guid="_eaeee0a4-20e1-48b3-b098-4adf4e61eaa7" id="sch.2-def.developmentplancriteria" type="definition">development plan criteria</defterm> see <intref check="valid" refid="sec.147" target.guid="_1aa67aa9-88d3-4170-97de-d03853958694">section 147</intref><intref check="valid" refid="sec.147-ssec.2" target.guid="_9d99874f-7745-4432-9790-7cb99ad41d99">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_d7c93127-db88-49ed-8f20-9bec6b0fff48" id="sch.2-def.drill_"><txt break.before="1"><defterm guid="_e18b29fc-8ed7-457a-b4f5-deb0aff5f5b2" id="sch.2-def.drill" type="definition">drill</defterm> includes to bore.</txt></definition><definition affected.by.uncommenced="0" change="del" guid="_0d974649-3562-4b07-bf71-abc06aa02239-del" id="sch.2-def.eligibleclaimant_-del"><txt break.before="1"><defterm guid="_2d8f06ca-b9a9-4626-a73a-0f53dd0a0441-del" id="sch.2-def.eligibleclaimant-del" type="definition">eligible claimant</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.81" target.doc.id="act-2014-047" target.guid="_a86cb34d-af6f-4d62-a426-415980d58775" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">section 81</legref><legref check="invalid" jurisd="QLD" type="act">(1)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_21a7673d-f2a9-4b35-a5b7-db4c2e61cc31" id="sch.2-def.eligibleperson_"><txt break.before="1"><defterm guid="_daa676c5-3ae3-462c-9847-657482a6d15b" id="sch.2-def.eligibleperson" type="definition">eligible person</defterm> see <intref check="valid" refid="sec.19" target.guid="_125e1bbf-5f2c-4e4f-8a96-d47467da0299">section 19</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_49526d8b-ba56-4f5a-93d0-42d22ad06ee9" id="sch.2-def.enhancedpetroleumrecovery_"><txt break.before="1"><defterm guid="_3cbf76d8-50ee-45d6-a694-6e94d3521edc" id="sch.2-def.enhancedpetroleumrecovery" type="definition">enhanced petroleum recovery</defterm> means producing petroleum by injecting a substance including for example, GHG, into a natural underground reservoir as defined under the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_14a93d2f-50a8-48aa-9816-2fd593a8acc6" id="sch.2-def.enter_"><txt break.before="1"><defterm guid="_705dbae7-045f-46f1-9e90-2a6e2904d41c" id="sch.2-def.enter" type="definition">enter</defterm> a place includes the exercise of the rights in relation to the place under <intref check="valid" refid="sec.423" target.guid="_bb9b1ae6-75de-4215-ac5c-3ff3a42f2910">section 423</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_6b167a23-0bd2-467e-9b23-83c72f1379f5" id="sch.2-def.EnvironmentalProtectionAct_"><txt break.before="1"><defterm guid="_c6573ace-2672-46e2-ba1b-5dcac1dbee09" id="sch.2-def.EnvironmentalProtectionAct" type="definition">Environmental Protection Act</defterm> means the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act"><name emphasis="yes">Environmental Protection Act 1994</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_6391391d-fc6b-497b-ba3c-04eeb22d3439" id="sch.2-def.excludedland_"><txt break.before="1"><defterm guid="_3cfc23f8-59d5-46f0-a361-2cea89d39625" id="sch.2-def.excludedland" type="definition">excluded land</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_eeb45dec-ea04-4b65-942b-ccc3803f0a38" id="sch.2-def.excludedland-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for a GHG permit—means excluded land for the permit decided under <intref check="valid" refid="sec.46" target.guid="_0312feeb-44ba-4d12-a828-50d74eb5643a">section 46</intref>; or</txt></block></li><li guid="_db238232-3a4c-45e0-a146-3a8bacb9f3af" id="sch.2-def.excludedland-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for a GHG lease—means excluded land for the lease decided under <intref check="valid" refid="sec.137" target.guid="_aa4e0410-6ee0-406a-bee0-30abe8c44211">section 137</intref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_26702f84-ccd7-4975-87fd-f135a9c93f17" id="sch.2-def.executiveofficer_"><txt break.before="1"><defterm guid="_a3134680-7b33-4a46-99ef-9851df81c095" id="sch.2-def.executiveofficer" type="definition">executive officer</defterm>, of a corporation, means a person who is concerned with or takes part in its management, whether or not the person is a director or the person’s position is given the name of executive officer.</txt></definition><definition affected.by.uncommenced="0" guid="_7793a4be-0ada-44c1-bd8e-7e5cb8c01aba" id="sch.2-def.explorationauthoritynonGHG_"><txt break.before="1"><defterm guid="_0b9aa3f3-14c0-4450-94c9-91273b844baa" id="sch.2-def.explorationauthoritynonGHG" type="definition">exploration authority (non-GHG)</defterm>, for <intref check="valid" refid="ch.4" target.guid="_faefc638-342e-43b0-a5ed-6ae7a9f9a690">chapter 4</intref>, see <intref check="valid" refid="sec.184" target.guid="_c566709e-a7cf-40ae-920e-5f4a37016cf9">section 184</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_2951daf6-9f50-4bc5-82b6-e2e0f37835ff" id="sch.2-def.fee_"><txt break.before="1"><defterm guid="_63c91e35-2744-4d20-98d5-d3fea303cef2" id="sch.2-def.fee" type="definition">fee</defterm> includes tax.</txt></definition><definition affected.by.uncommenced="0" guid="_96ff133c-f286-40ed-ada6-3ca1f99f5a31" id="sch.2-def.formedroad_"><txt break.before="1"><defterm guid="_221cd2da-d12d-4b55-9289-a263dafcb22c" id="sch.2-def.formedroad" type="definition">formed road </defterm>means any existing road or track on private or public land used or that may reasonably be capable of being used to drive or ride motor vehicles.</txt></definition><definition affected.by.uncommenced="0" guid="_5345fc8e-0041-4c34-a7e1-cabab0e87766" id="sch.2-def.GeothermalAct_"><txt break.before="1"><defterm guid="_baba2ed5-4e1a-456c-9366-c4cf7922c6a9" id="sch.2-def.GeothermalAct" type="definition">Geothermal Act</defterm> means the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="yes">Geothermal Energy Act 2010</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_30ba8fc2-3fa0-4387-a1fe-c75fa146e3c3" id="sch.2-def.geothermallease_"><txt break.before="1"><defterm guid="_9dc8a102-4e6e-45b3-9c78-7886372c74db" id="sch.2-def.geothermallease" type="definition">geothermal lease</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.19" target.doc.id="act-2010-031" target.guid="_4da84579-7d44-4709-8851-3d16add912be" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act">section 19</legref><legref check="invalid" jurisd="QLD" type="act">(1)</legref><legref check="invalid" jurisd="QLD" type="act">(b)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_f11d310b-5f12-4d7f-9906-b13710e5fb48" id="sch.2-def.geothermalpermit_"><txt break.before="1"><defterm guid="_ee7daefe-0d67-4d32-83f4-928d8506e24f" id="sch.2-def.geothermalpermit" type="definition">geothermal permit</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.19" target.doc.id="act-2010-031" target.guid="_4da84579-7d44-4709-8851-3d16add912be" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act">section 19</legref><legref check="invalid" jurisd="QLD" type="act">(1)</legref><legref check="invalid" jurisd="QLD" type="act">(a)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_fbe8f51d-266e-41a5-983e-16461b9ddeee" id="sch.2-def.geothermaltenure_"><txt break.before="1"><defterm guid="_0462a835-2980-4786-a950-d0757c6a0bb8" id="sch.2-def.geothermaltenure" type="definition">geothermal tenure</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.19" target.doc.id="act-2010-031" target.guid="_4da84579-7d44-4709-8851-3d16add912be" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act">section 19</legref><legref check="invalid" jurisd="QLD" type="act">(2)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_1c390f8a-87b0-4c0f-9b18-8562c4dade3f" id="sch.2-def.GHG_"><txt break.before="1"><defterm guid="_dee7bc6c-070a-448a-9be1-52bfbd4dc20b" id="sch.2-def.GHG" type="definition">GHG</defterm> means greenhouse gas.</txt></definition><definition affected.by.uncommenced="0" guid="_38dd2ab4-d227-4595-9ece-36b913e75284" id="sch.2-def.GHGassessmentcriteria_"><txt break.before="1"><defterm guid="_6c595d48-0626-4290-97de-f262137e1992" id="sch.2-def.GHGassessmentcriteria" type="definition">GHG assessment criteria </defterm>see <intref check="valid" refid="sec.196" target.guid="_fb2ff223-5be4-453e-871d-662a7cb483b7">section 196</intref><intref check="valid" refid="sec.196-ssec.1" target.guid="_e7002d58-8b2c-46bf-80a8-a513aaed3a05">(1)</intref><intref check="valid" refid="sec.196-ssec.1-para1.b" target.guid="_64e19be9-bf7c-478c-9327-e2a915855569">(b)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_5ac4ac17-7a25-4b81-b923-c0c0bcd1ef73" id="sch.2-def.GHGauthority_"><txt break.before="1"><defterm guid="_d357a7c2-94ac-471d-a5a6-c0a1e3221bbd" id="sch.2-def.GHGauthority" type="definition">GHG authority</defterm> see <intref check="valid" refid="sec.18" target.guid="_a40ec099-1a0e-45e8-aeda-9b4fce944dcb">section 18</intref><intref check="valid" refid="sec.18-ssec.3" target.guid="_4539587a-f259-4f0e-94ba-fb98e362a6f4">(3)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_20b925b1-d96b-4b4b-80c5-dd32044fbfd7" id="sch.2-def.GHGcoordinationarrangement_"><txt break.before="1"><defterm guid="_7e243daa-19bc-48e6-a318-b0ff67d93fe2" id="sch.2-def.GHGcoordinationarrangement" type="definition">GHG coordination arrangement</defterm> see <intref check="valid" refid="sec.186" target.guid="_780d2fa6-1285-4a39-bfdf-679d36f6ee8f">section 186</intref><intref check="valid" refid="sec.186-ssec.3" target.guid="_53526562-4ccb-4261-88d0-abde9493b6ca">(3)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_c1ce1093-995b-4afc-8877-f16411c66731" id="sch.2-def.GHGdataacquisitionauthority_"><txt break.before="1"><defterm guid="_ccaa2542-a590-499d-8179-c9f202011085" id="sch.2-def.GHGdataacquisitionauthority" type="definition">GHG data acquisition authority</defterm> means a GHG injection and storage data acquisition authority.</txt></definition><definition affected.by.uncommenced="0" guid="_f30d97c2-7bc5-475f-9c8b-7dfe173280f9" id="sch.2-def.GHGexplorationpermit_"><txt break.before="1"><defterm guid="_00f0fa45-bc56-4373-b864-969ecd827f43" id="sch.2-def.GHGexplorationpermit" type="definition">GHG exploration permit</defterm> (also called a <defterm guid="_7bd20d04-ba16-48f8-9866-10a5efa70c76" id="sch.2-def.GHGpermit" type="definition">GHG permit</defterm>) see <intref check="valid" refid="sec.18" target.guid="_a40ec099-1a0e-45e8-aeda-9b4fce944dcb">section 18</intref><intref check="valid" refid="sec.18-ssec.1" target.guid="_beb8d1b4-a031-4034-b48d-a432acd20d58">(1)</intref><intref check="valid" refid="sec.18-ssec.1-para1.a" target.guid="_5174170f-7a63-4a86-8d23-5a27683711e0">(a)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_00c26147-fd47-47d3-bcca-98c14e233cb5" id="sch.2-def.GHGinjectionandstoragedataacquisitionauthority_"><txt break.before="1"><defterm guid="_189b5a74-14ab-4ddf-9b1c-3b4f70bd8003" id="sch.2-def.GHGinjectionandstoragedataacquisitionauthority" type="definition">GHG injection and storage data acquisition authority</defterm> (also called a <defterm guid="_d2f521e7-5607-4361-b3bc-772db88f9054" id="sch.2-def.GHGdataacquisitionauthority-oc.2" type="definition">GHG data acquisition authority</defterm>) see <intref check="valid" refid="sec.18" target.guid="_a40ec099-1a0e-45e8-aeda-9b4fce944dcb">section 18</intref><intref check="valid" refid="sec.18-ssec.1" target.guid="_beb8d1b4-a031-4034-b48d-a432acd20d58">(1)</intref><intref check="valid" refid="sec.18-ssec.1-para1.c" target.guid="_974aedc5-5d16-4b4c-8093-15de39087893">(c)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_78f01be8-ab63-489d-8d88-71ed9f4ac00d" id="sch.2-def.GHGinjectionandstoragelease_"><txt break.before="1"><defterm guid="_a24410be-06cb-45d4-9eca-ac6d44047dd8" id="sch.2-def.GHGinjectionandstoragelease" type="definition">GHG injection and storage lease</defterm> (also called a <defterm guid="_f92b696f-eb7e-411a-b4c3-62fd7e9fc870" id="sch.2-def.GHGlease" type="definition">GHG lease</defterm>) see <intref check="valid" refid="sec.18" target.guid="_a40ec099-1a0e-45e8-aeda-9b4fce944dcb">section 18</intref><intref check="valid" refid="sec.18-ssec.1" target.guid="_beb8d1b4-a031-4034-b48d-a432acd20d58">(1)</intref><intref check="valid" refid="sec.18-ssec.1-para1.b" target.guid="_788679a0-38bc-442b-ae35-7470ef517295">(b)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_54756450-19a5-4b34-9939-371cd236600b" id="sch.2-def.GHGinterest_"><txt break.before="1"><defterm guid="_097d6e74-8911-4634-8643-375f450a6311" id="sch.2-def.GHGinterest" type="definition">GHG interest </defterm>means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2ca31a54-9b6b-48e0-a48d-fff1514861e4" id="sch.2-def.GHGinterest-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a GHG authority; or</txt></block></li><li guid="_f5ab8cff-7e17-450a-bb4c-96d88f042bf7" id="sch.2-def.GHGinterest-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a right existing under, or in relation to, a GHG authority.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_59387aae-ddf7-45ca-9e6d-0bc25891bcd5" id="sch.2-def.GHGlease_"><txt break.before="1"><defterm guid="_29c00208-0a0e-41e5-acad-eca780451cc1" id="sch.2-def.GHGlease-oc.2" type="definition">GHG lease</defterm> means a GHG injection and storage lease.</txt></definition><definition affected.by.uncommenced="0" guid="_36dbe0ad-6ef2-4bbd-b308-e2129bf9e747" id="sch.2-def.GHGpermit_"><txt break.before="1"><defterm guid="_c92cd944-af63-4bab-9d0d-97fa3621bdb8" id="sch.2-def.GHGpermit-oc.2" type="definition">GHG permit</defterm> means a GHG exploration permit.</txt></definition><definition affected.by.uncommenced="0" guid="_ba272972-acdf-48e9-965a-2f88b93d040e" id="sch.2-def.GHGstatement_"><txt break.before="1"><defterm guid="_84fb8a68-3f4e-4c2e-a035-e8e4f66cc37c" id="sch.2-def.GHGstatement" type="definition">GHG statement</defterm> see <intref check="valid" refid="sec.196" target.guid="_fb2ff223-5be4-453e-871d-662a7cb483b7">section 196</intref><intref check="valid" refid="sec.196-ssec.1" target.guid="_e7002d58-8b2c-46bf-80a8-a513aaed3a05">(1)</intref><intref check="valid" refid="sec.196-ssec.1-para1.a" target.guid="_3ac3b1b9-1f84-441e-be20-03e04e2b50db">(a)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_61f3d1d0-ee8e-4eb8-8913-f1ba7ca6c6ea" id="sch.2-def.GHGstorage_"><txt break.before="1"><defterm guid="_a1820f95-d2ef-473e-be42-e71a27427a6a" id="sch.2-def.GHGstorage" type="definition">GHG storage </defterm>see <intref check="valid" refid="sec.3" target.guid="_c8cbdc87-e0f4-4846-88f1-bdbf0c4f550b">section 3</intref><intref check="valid" refid="sec.3-ssec.2" target.guid="_712cd2a4-a87c-4c27-b740-5a552e06586f">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_2d1899c9-1ec2-47bf-9914-085399ca18be" id="sch.2-def.GHGstorageactivity_"><txt break.before="1"><defterm guid="_6f69bc98-53b7-49e5-9dc4-5f54d8a2cdec" id="sch.2-def.GHGstorageactivity" type="definition">GHG storage activity</defterm> see <intref check="valid" refid="sec.23" target.guid="_66f430f2-578a-4860-be3c-6385dad73b48">section 23</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_3df8f120-35fd-4067-9ca0-a6341d595317" id="sch.2-def.GHGstorageexploration_"><txt break.before="1"><defterm guid="_e5059ef6-9c8f-4fed-aa16-c53966461130" id="sch.2-def.GHGstorageexploration" type="definition">GHG storage exploration</defterm> see <intref check="valid" refid="sec.15" target.guid="_04b46051-2b4b-4560-b9ae-98ffe19c1bbe">section 15</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_adb1d149-ca9c-40f0-848d-86615eae6b32" id="sch.2-def.GHGstorageinjectiontesting_"><txt break.before="1"><defterm guid="_9feafd2b-3cbb-4f23-933b-466eb4631ac1" id="sch.2-def.GHGstorageinjectiontesting" type="definition">GHG storage injection testing</defterm> see <intref check="valid" refid="sec.16" target.guid="_cfee6ff8-573b-4720-a2f5-0b4560578b63">section 16</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_9924d959-e507-4ab9-9597-714de35282a3" id="sch.2-def.GHGstoragereservoir_"><txt break.before="1"><defterm guid="_273da120-a13a-401c-9bab-30f549b1a345" id="sch.2-def.GHGstoragereservoir" type="definition">GHG storage reservoir </defterm>see <intref check="valid" refid="sec.13" target.guid="_48e73ce5-6780-40b1-8f6a-4daaf390f519">section 13</intref><intref check="valid" refid="sec.13-para1.a" target.guid="_4f6dd114-a751-4e0f-b1b0-d780d79ab60e">(a)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_92b3e7b4-da2e-4ea4-b7ae-b019855f7155" id="sch.2-def.GHGstorageviabilityreport_"><txt break.before="1"><defterm guid="_240cfba0-a45f-413a-8c89-f536f15e7792" id="sch.2-def.GHGstorageviabilityreport" type="definition">GHG storage viability report</defterm> see <intref check="valid" refid="sec.245" target.guid="_97a0f17b-84e5-42b4-aca8-41c499529aeb">section 245</intref><intref check="valid" refid="sec.245-ssec.1" target.guid="_4a84fb6c-726f-4c70-97d0-710b9e316bc8">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_8fce9ccd-3124-461f-9f88-61861a7ad953" id="sch.2-def.GHGstream_"><txt break.before="1"><defterm guid="_9416b947-d847-4ca1-82ab-b381b51bde8e" id="sch.2-def.GHGstream" type="definition">GHG stream</defterm> see <intref check="valid" refid="sec.12" target.guid="_a1370cf9-45f5-4d33-9ea0-422705c805d6">section 12</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_bf8c4124-41d4-4ae3-b8f6-a5227f2cfb0c" id="sch.2-def.GHGstreampipeline_"><txt break.before="1"><defterm guid="_412efccf-c5c8-4067-b6b4-cbc71fc5b060" id="sch.2-def.GHGstreampipeline" type="definition">GHG stream pipeline</defterm> see <intref check="valid" refid="sec.17" target.guid="_79c2b709-2af5-487a-92e9-efe08fcd600c">section 17</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_3877af68-c938-4159-b7c7-dbd8b8440094" id="sch.2-def.GHGstreamstorage_"><txt break.before="1"><defterm guid="_1ce56dc6-cbe8-41c6-895e-4b7c3bb08dc3" id="sch.2-def.GHGstreamstorage" type="definition">GHG stream storage </defterm>see <intref check="valid" refid="sec.14" target.guid="_ec654683-7871-4f9f-a659-0b1618b46e90">section 14</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_4d89e8ae-fa2f-4d85-98d9-c2890f622fa4" id="sch.2-def.GHGstreamstoragesite_"><txt break.before="1"><defterm guid="_5a5a0a01-a71c-437b-b172-aa7c00c85b80" id="sch.2-def.GHGstreamstoragesite" type="definition">GHG stream storage site</defterm> see <intref check="valid" refid="sec.13" target.guid="_48e73ce5-6780-40b1-8f6a-4daaf390f519">section 13</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_244f2139-17c0-4ba2-8d98-c743d3544965" id="sch.2-def.GHGtenure_"><txt break.before="1"><defterm guid="_9d4b9557-8d3c-4ab1-820c-6d692cd1d7ca" id="sch.2-def.GHGtenure" type="definition">GHG tenure</defterm> see <intref check="valid" refid="sec.18" target.guid="_a40ec099-1a0e-45e8-aeda-9b4fce944dcb">section 18</intref><intref check="valid" refid="sec.18-ssec.2" target.guid="_58cbbe7a-3e65-48a3-b1fa-e925a56cfead">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_aaf8f5fd-da7f-48b5-ae84-bf2d2d57fe62" id="sch.2-def.GHGwell_"><txt break.before="1"><defterm guid="_5cf79b98-c007-42c9-9705-202027a53c64" id="sch.2-def.GHGwell" type="definition">GHG well</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6849e623-5ffc-41d0-999a-cf16052552ff" id="sch.2-def.GHGwell-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">A <defterm guid="_e5e88d53-9ddd-4f78-83ca-818fe4e9695c" type="mention">GHG well</defterm> is a hole in the ground made or being made by drilling, boring or any other means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_eb2ef55c-e33c-425d-b290-d028fd7cec7b" id="sch.2-def.GHGwell-para1.1-para2.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to carry out GHG storage exploration; or</txt></block></li><li guid="_307b206f-0d06-4a63-aed8-cf037e84d8a1" id="sch.2-def.GHGwell-para1.1-para2.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for GHG stream storage.</txt></block></li></list></block></li><li guid="_fd24dbcc-9563-4356-b9d6-3467043c9dee" id="sch.2-def.GHGwell-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">A <defterm guid="_b8cb97bf-8141-4781-bed9-406839894fc2" type="mention">GHG well</defterm> includes the casing for the well and any of the following attached to the well—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a9f9f398-b1e0-49ad-9391-a51e087864e3" id="sch.2-def.GHGwell-para1.2-para2" provision.type="other"><no>•</no><block><txt break.before="0">the casing head</txt></block></li><li guid="_9df7d44c-11bb-4d01-89ea-c181fdab3fa4" id="sch.2-def.GHGwell-para1.2-para2-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">a casing hanger or spool or tubing hanger</txt></block></li><li guid="_e1ad56eb-a65d-4a8c-a400-cefbd34d7a88" id="sch.2-def.GHGwell-para1.2-para2-oc.3" provision.type="other"><no>•</no><block><txt break.before="0">flow control equipment up to and including the wing valves.</txt></block></li></list></block></li><li guid="_7815e8d8-d362-447b-a3ab-60e870c72c4c" id="sch.2-def.GHGwell-para1.3" provision.type="other"><no>3</no><block><txt break.before="0">To remove any doubt, it is declared that a <defterm guid="_0bdb5fb3-ae59-4e73-8aca-0ba7b2019f3b" type="mention">GHG well </defterm>does not include a seismic shot hole or shallow hole drilled to work out a geological structure.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_00679c55-37c0-4dc3-a8ab-131323198669" id="sch.2-def.give_"><txt break.before="1"><defterm guid="_4476bbf0-62f2-4a4b-8a55-82de45dbf8cb" id="sch.2-def.give" type="definition">give</defterm>, a document to the Minister or the chief executive, has the meaning affected by <intref check="valid" refid="sec.411" target.guid="_1563d9ac-bd31-449e-842a-931b0e660c2b">section 411</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_1417ddd2-f884-4cab-8814-cdd1f8b270ec" id="sch.2-def.holder_"><txt break.before="1"><defterm guid="_74633739-0922-499f-9088-3c0c48215cf9" id="sch.2-def.holder" type="definition">holder</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_eb1579cf-67bf-42f3-943f-c4782f8315d6" id="sch.2-def.holder-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">of a GHG authority other than a GHG data acquisition authority, means each person recorded as its holder in the register; or</txt></block></li><li guid="_03683425-b6f7-491e-8f37-6d5cf215c5af" id="sch.2-def.holder-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">of a GHG data acquisition authority, means the person mentioned in <intref check="valid" refid="sec.240" target.guid="_1a071fc4-a9cc-41ac-94cf-291648157d60">section 240</intref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_2267932a-7a5c-4bcc-928a-670917943ad7" id="sch.2-def.holdersubmissions_"><txt break.before="1"><defterm guid="_8e473eaf-63fa-4e56-8a72-c5bb87ca6858" id="sch.2-def.holdersubmissions" type="definition">holder submissions</defterm> see <intref check="valid" refid="sec.199" target.guid="_bb5e8a41-b5f5-4393-b85c-56eccaa6f4b9">section 199</intref><intref check="valid" refid="sec.199-ssec.1" target.guid="_b83212e2-9928-415e-bb3d-e70ef0edacfa">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_ff955eb4-958e-459e-9ee9-9df13e2ed708" id="sch.2-def.independentviabilityassessment_"><txt break.before="1"><defterm guid="_5865b2d6-c617-4b42-b79c-f7e5e88bf561" id="sch.2-def.independentviabilityassessment" type="definition">independent viability assessment</defterm> see <intref check="valid" refid="sec.247" target.guid="_f0961cf8-57fc-4a95-b754-ffb77d8bff34">section 247</intref><intref check="valid" refid="sec.247-ssec.2" target.guid="_de1adac7-f47f-42eb-961e-4ea73debb62e">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_f2940846-1814-44e9-be74-781fd294129f" id="sch.2-def.informationnotice_"><txt break.before="1"><defterm guid="_48b2f197-764e-439f-98f9-c5cb32066e74" id="sch.2-def.informationnotice" type="definition">information notice</defterm>, for a decision, means a notice stating each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c49fc6c5-5e45-4af6-aa93-aa0301a11f68" id="sch.2-def.informationnotice-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the decision, and the reasons for it;</txt></block></li><li guid="_b8213b7e-c39f-407d-8903-8842673fc50e" id="sch.2-def.informationnotice-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the rights of appeal under this Act;</txt></block></li><li guid="_02ea76a9-56fc-42d5-baa1-6cc749da7376" id="sch.2-def.informationnotice-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the period in which any appeal under this Act must be started;</txt></block></li><li guid="_b06b9007-c461-4749-9db6-65a8558cb138" id="sch.2-def.informationnotice-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">how rights of appeal under this Act are to be exercised;</txt></block></li><li guid="_0b7eca8f-315c-485d-887f-e3e7b163b8a8" id="sch.2-def.informationnotice-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">that a stay of a decision the subject of an appeal under this Act may be applied for under this Act.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_50632690-ec32-43b8-bc6c-61865056d4dc" id="sch.2-def.initialdevelopmentplanrequirements_"><txt break.before="1"><defterm guid="_65f5229a-aa0e-48bc-af39-f58e3f576ac6" id="sch.2-def.initialdevelopmentplanrequirements" type="definition">initial development plan requirements</defterm> see <intref check="valid" refid="sec.140" target.guid="_8e99c701-d8a7-4755-af9b-389017d20fcb">section 140</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_9d0b7c7e-620a-402a-81d8-584bafa8b5d2" id="sch.2-def.initialworkprogramrequirements_"><txt break.before="1"><defterm guid="_a1ce74a4-751d-47d3-b30a-1e384ca07138" id="sch.2-def.initialworkprogramrequirements" type="definition">initial work program requirements</defterm> see <intref check="valid" refid="sec.51" target.guid="_5a0f8d28-e9a3-4238-933b-a01647dfc1eb">section 51</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_0823ed5c-d1da-428e-8749-1f199b6a8c57" id="sch.2-def.interferewith_"><txt break.before="1"><defterm guid="_c4e2c777-958c-4d77-965e-aa30f7d30791" id="sch.2-def.interferewith" type="definition">interfere with</defterm> includes tamper with.</txt></definition><definition affected.by.uncommenced="0" guid="_664371a9-6b0e-4c4b-a632-e2fb09d3d11e" id="sch.2-def.land_"><txt break.before="1"><defterm guid="_f137daaf-66d9-492e-8b87-fd57345c4a92" id="sch.2-def.land" type="definition">land </defterm>includes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ff1f823c-0f45-4623-b51b-8579888ce47d" id="sch.2-def.land-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">land covered by Queensland waters; and</txt></block></li><li guid="_2be10635-5da6-4988-b0d4-eb9c2da7c395" id="sch.2-def.land-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">subterranean land.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_2fb63ed8-fb15-45c0-b5fd-5430d6e396df" id="sch.2-def.landaccesscode_"><txt break.before="1"><defterm guid="_40151da0-2540-423f-9f56-bc31aa499bdd" id="sch.2-def.landaccesscode" type="definition">land access code</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.36" target.doc.id="act-2014-047" target.guid="_35a465e1-da93-40e2-a26f-9a2c1fb50a1b" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">section 36</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_64653096-d305-497d-bc8d-10f818f2e019" id="sch.2-def.laterdevelopmentplanrequirements_"><txt break.before="1"><defterm guid="_df3943d7-0ebe-473f-bb56-0d1a18415c65" id="sch.2-def.laterdevelopmentplanrequirements" type="definition">later development plan requirements</defterm> see <intref check="valid" refid="sec.150" target.guid="_578a81dd-7b24-41b9-88ad-bfb098179fe9">section 150</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_5b945e2b-44e1-4d12-a26b-27ca5bb7aebe" id="sch.2-def.laterworkprogramrequirements_"><txt break.before="1"><defterm guid="_247e1b54-096d-449d-b8ee-10ff79eb1f43" id="sch.2-def.laterworkprogramrequirements" type="definition">later work program requirements</defterm> see <intref check="valid" refid="sec.58" target.guid="_c0963fe2-7d05-4998-b04c-4fe887dd3250">section 58</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_59452e8c-0e97-481a-87fa-ef8704203a73" id="sch.2-def.legacyborehole_"><txt break.before="1"><defterm guid="_962513f4-412f-4280-8e58-4eb7fa91bed3" id="sch.2-def.legacyborehole" type="definition">legacy borehole </defterm>means a bore or well that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4b372bd6-11d8-40ce-a1f0-79cd9ef35cb4" id="sch.2-def.legacyborehole-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">was drilled for the purpose (the <defterm guid="_e32f3a81-dd83-47c3-acc6-bd684b06cc2e" id="sch.2-def.legacyborehole-def.originalpurpose" type="definition">original purpose</defterm>) of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b65f2941-dc31-49c0-85ac-763e3ea49e60" id="sch.2-def.legacyborehole-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">exploration or production of mineral or petroleum resources; or</txt></block></li><li guid="_6e522fc5-4607-4287-8c67-730d605c3517" id="sch.2-def.legacyborehole-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">informing the exploration or production of mineral or petroleum resources; and</txt></block></li></list></block></li><li guid="_369bd5d4-7395-4236-bf4a-c3bb1c983c5d" id="sch.2-def.legacyborehole-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is no longer used for the original or another purpose.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_101c1238-8502-4494-b75b-5a4a9f7bacf8" id="sch.2-def.makesubmissions_"><txt break.before="1"><defterm guid="_5c8827fe-9182-4d5a-a173-63e16cc23792" id="sch.2-def.makesubmissions" type="definition">make submissions</defterm> has the meaning affected by <intref check="valid" refid="sec.411" target.guid="_1563d9ac-bd31-449e-842a-931b0e660c2b">section 411</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_55038ac3-06dd-44dc-9e3c-338d6de966e7" id="sch.2-def.mandatorycondition_"><txt break.before="1"><defterm guid="_728228d3-5366-45b3-b2bb-c803551b92d5" id="sch.2-def.mandatorycondition" type="definition">mandatory condition</defterm>, of a GHG authority, see <intref check="valid" refid="sec.20" target.guid="_6a183a3b-a88c-4f09-9eea-0fc8117ffb80">section 20</intref><intref check="valid" refid="sec.20-ssec.2" target.guid="_88215ea2-2785-4d6a-9e25-a4f02d4849d9">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_dc8863c4-60da-47a3-bedc-f6aa9743b916" id="sch.2-def.mandatoryprovision_"><txt break.before="1"><defterm guid="_89ed3cbc-3276-40fb-8bee-a97c808987a5" id="sch.2-def.mandatoryprovision" type="definition">mandatory provision</defterm>, of the land access code, means a provision of that code that the code requires compliance with.</txt></definition><definition affected.by.uncommenced="0" guid="_64f84fac-e959-445d-bb2f-2341ba9319cd" id="sch.2-def.MineralResourcesAct_"><txt break.before="1"><defterm guid="_0dd40d14-4871-480d-bbe8-8e1a12991c92" id="sch.2-def.MineralResourcesAct" type="definition">Mineral Resources Act</defterm> means the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="yes">Mineral Resources Act 1989</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_418706c2-ca83-4a5e-9145-480dfce6a0c5" id="sch.2-def.mininginterest_"><txt break.before="1"><defterm guid="_7e5b327a-8812-4d98-b59e-797e7b2166b4" id="sch.2-def.mininginterest" type="definition">mining interest </defterm>means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_427a3859-820b-4ddf-abfe-0899874d9490" id="sch.2-def.mininginterest-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a mining tenement under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>; or</txt></block></li><li guid="_707fbb51-7745-4008-b096-5125753924c7" id="sch.2-def.mininginterest-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a tenure held from the State under another Act about mining under which tenure the holder is authorised to carry out mining under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref> or a related mineral or energy resources activity.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_b1b7b0ec-75db-4acd-8f5b-65ba90d512a0" id="sch.2-def.mininglease_"><txt break.before="1"><defterm guid="_24ec7cc7-e93f-4dd2-b2d4-396459e0fb9a" id="sch.2-def.mininglease" type="definition">mining lease</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sch.2" target.doc.id="act-1989-110" target.guid="_b509e0c2-c860-4462-b500-bf240c580505" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">schedule 2</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_11dcc203-382f-4c35-9e26-6e499ae11b50" id="sch.2-def.noncomplianceaction_"><txt break.before="1"><defterm guid="_d9266eef-457b-45a9-a726-d8c3843d954b" id="sch.2-def.noncomplianceaction" type="definition">noncompliance action</defterm> means action of a type mentioned in <intref check="valid" refid="sec.379" target.guid="_7bb5ce56-1401-4239-84f9-bb0e4d600312">section 379</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_2b75c38d-465d-48c8-8deb-54b7bc8f335f" id="sch.2-def.notice_"><txt break.before="1"><defterm guid="_24a3ee41-a3cf-4e31-b04e-fdc5557bc0d2" id="sch.2-def.notice" type="definition">notice</defterm> means a written notice.</txt></definition><definition affected.by.uncommenced="0" guid="_ba27969b-1f1e-45ee-8e23-51004a8605f1" id="sch.2-def.noticeofintentiontoresume_"><txt break.before="1"><defterm guid="_09a0a2e0-f989-44a6-895e-b1927502cb59" id="sch.2-def.noticeofintentiontoresume" type="definition">notice of intention to resume</defterm>, for the proposed taking of land under a resumption law, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a7c38a7e-cb54-4f1b-acc2-b4338dd88671" id="sch.2-def.noticeofintentiontoresume-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the land is taken under the process stated in the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="no">ALA</name></legref> (whether the land is taken under the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="no">ALA</name></legref> or another resumption law)—the notice of intention to resume under the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="no">ALA</name></legref>; or</txt></block></li><li guid="_0e9c133b-7709-4062-b8ff-3b073ffa5b58" id="sch.2-def.noticeofintentiontoresume-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—the notice, however named, required to be given under the resumption law to notify persons of the proposed taking.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_1de2fa2a-89df-4a51-a00c-bf3cd9d89567" id="sch.2-def.notifiableroaduse_"><txt break.before="1"><defterm guid="_b2d0e95a-6189-41a6-9d09-672d7cfa6617" id="sch.2-def.notifiableroaduse" type="definition">notifiable road use</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.62" target.doc.id="act-2014-047" target.guid="_85adaf9b-3141-410c-91ed-802a9fae9194" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">section 62</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_a89a240a-de0f-415d-a43c-6d4540b644b9" id="sch.2-def.occupier_"><txt break.before="1"><defterm guid="_2e0fb6c2-fe93-444e-99c1-ccd620d9d5b1" id="sch.2-def.occupier" type="definition">occupier</defterm>, of a place, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_66bf7539-6be4-4c5f-ae66-dbd58a1e5ebd" id="sch.2-def.occupier-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a person who, under an Act or a lease registered under the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-011" target.version.series="d93aa9d4-b864-42f4-88c5-b51b98fee2e2" type="act"><name emphasis="yes">Land Title Act 1994</name></legref>, has a right to occupy the place other than under a mining interest, petroleum authority, 1923 Act petroleum tenure, GHG authority or geothermal tenure; or</txt></block></li><li guid="_264410c0-0259-4528-b7c4-2798cc35cb25" id="sch.2-def.occupier-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a person who has been given a right to occupy the place by an owner of the place or another person mentioned in <intref check="valid" refid="sch.2-def.occupier-para1.a" target.guid="_66bf7539-6be4-4c5f-ae66-dbd58a1e5ebd">paragraph (a)</intref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_82ce2ab1-a6e0-4a69-ae5c-1f7bec334607" id="sch.2-def.on_"><txt break.before="1"><defterm guid="_5fe874f4-6f98-4aac-bbef-81e9eb9b88d4" id="sch.2-def.on" type="definition">on</defterm>, land or another place, includes across, attached to, in, under or over the land or place.</txt></definition><definition affected.by.uncommenced="0" guid="_8f6062fb-4756-4ba2-9852-88244d8396d0" id="sch.2-def.operatingplant_"><txt break.before="1"><defterm guid="_601da23b-4ba8-4943-aa12-62ee9ad06396" id="sch.2-def.operatingplant" type="definition">operating plant</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.670" target.doc.id="act-2004-025" target.guid="_ca9c15a9-9ec2-415e-a6f6-8de0dd5edbf7" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">section 670</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_7ac5947c-d025-46d9-974d-325def08b394" id="sch.2-def.operator_"><txt break.before="1"><defterm guid="_d80f9eb6-e9dd-446f-bd4c-902bebd53aaf" id="sch.2-def.operator" type="definition">operator</defterm>, of an operating plant, see the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.673" target.doc.id="act-2004-025" target.guid="_e43ae51f-18e7-4ccb-8c84-1ab892c45eb3" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">section 673</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_161961e9-0cc1-4318-9085-c075be25e47b" id="sch.2-def.overlappingauthority_"><txt break.before="1"><defterm guid="_eb7f038d-5da5-4a0b-811a-152c716e3085" id="sch.2-def.overlappingauthority" type="definition">overlapping authority</defterm> see <intref check="valid" refid="sec.183" target.guid="_2727cfb8-d940-4e5e-87af-f59b61ef2cb2">section 183</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_f1b264ae-f63a-4f78-8962-7dfbefb09484" id="sch.2-def.overlappingauthorityapplicationperiod_"><txt break.before="1"><defterm guid="_2109abd8-5822-4f42-a465-4a68e29b0e3a" id="sch.2-def.overlappingauthorityapplicationperiod" type="definition">overlapping authority application period</defterm> see <intref check="valid" refid="sec.205" target.guid="_348769a4-9bff-4bbf-bd13-73e24e638b23">section 205</intref><intref check="valid" refid="sec.205-ssec.2" target.guid="_803fd4fc-f2ec-4792-8c58-56ae9b7d481d">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_5f5f1b04-a1cd-4a4d-a6ac-eadb8d1ea004" id="sch.2-def.overlappingauthoritypriority_"><txt break.before="1"><defterm guid="_4fd73de8-16d9-464d-9115-e61e32fde9f8" id="sch.2-def.overlappingauthoritypriority" type="definition">overlapping authority priority </defterm>see <intref check="valid" refid="sec.199" target.guid="_bb5e8a41-b5f5-4393-b85c-56eccaa6f4b9">section 199</intref><intref check="valid" refid="sec.199-ssec.3" target.guid="_a4201865-ab59-4440-97c9-78fd4b45631f">(3)</intref><intref check="valid" refid="sec.199-ssec.3-para1.b" target.guid="_75173843-dd07-41d0-a985-a58b56ce431c">(b)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_388a0f67-916c-453f-b98f-954c274cae3a" id="sch.2-def.owner_"><txt break.before="1"><defterm guid="_7ea618e9-4bac-46d1-a55b-83e273b96dbb" id="sch.2-def.owner" type="definition">owner</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_35adf0d5-de13-4983-b1cd-af7c80e5ebd9" id="sch.2-def.owner-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">An <defterm guid="_8cb822aa-8b1b-4605-a421-5c087d38f844" type="mention">owner</defterm>, of land, means each person as follows in relation to the land—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_19d5f1b8-2200-49f2-9350-a38324fb971d" id="sch.2-def.owner-para1.1-para2.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for freehold land—a registered owner;</txt></block></li><li guid="_0d1a53ce-317b-4262-a31c-492f022129b5" id="sch.2-def.owner-para1.1-para2.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for land for which a person is, or will on performing conditions, be entitled to a deed of grant in fee simple—the person;</txt></block></li><li guid="_6e607d3c-89d1-4e10-940d-a56e94ad25c1" id="sch.2-def.owner-para1.1-para2.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if an estate in fee simple of land is being purchased from the State—the purchaser;</txt></block></li><li guid="_2a519c2e-5492-4a5a-be9c-c4d907136019" id="sch.2-def.owner-para1.1-para2.d" provision.type="other"><no>(d)</no><block><txt break.before="0">for a public road—the public road authority for the road;</txt></block></li><li guid="_7d0220dc-84b9-4c8c-82f8-3183b536b6e5" id="sch.2-def.owner-para1.1-para2.e" provision.type="other"><no>(e)</no><block><txt break.before="0">for land that is busway land, light rail land, rail corridor land or a cane railway or other railway—the public land authority for the land;</txt></block></li><li guid="_339bbf48-2319-4ec5-bd61-ff142d104a00" id="sch.2-def.owner-para1.1-para2.f" provision.type="other"><no>(f)</no><block><txt break.before="0">for required land under the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-008" target.version.series="060a2469-1586-4719-b2aa-d22cc9ff8daf" type="act"><name emphasis="yes">Transport Infrastructure Act 1994</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.436" target.doc.id="act-1994-008" target.guid="_7246d0c3-ddcc-4dfd-b375-732fe5ed5b19" target.version.series="060a2469-1586-4719-b2aa-d22cc9ff8daf" type="act">section 436</legref>—the chief executive of the department in which that Act is administered;</txt></block></li><li guid="_77e86d3a-96a6-4042-a41a-11b585008a8a" id="sch.2-def.owner-para1.1-para2.g" provision.type="other"><no>(g)</no><block><txt break.before="0">for a forest entitlement area, State forest or timber reserve under the <legref check="valid" jurisd="QLD" target.doc.id="act-1959-058" target.version.series="05878269-0f72-4d60-b053-3f083a8d73ea" type="act"><name emphasis="yes">Forestry Act 1959</name></legref>—the chief executive of the department in which that Act is administered;</txt></block></li><li guid="_3343265e-2b7e-4a3c-a335-e997d135b5dc" id="sch.2-def.owner-para1.1-para2.h" provision.type="other"><no>(h)</no><block><txt break.before="0">for a conservation park or resources reserve under the <legref check="valid" jurisd="QLD" target.doc.id="act-1992-020" target.version.series="5a5e324b-388d-450f-843c-b363ee68996c" type="act"><name emphasis="yes">Nature Conservation Act 1992</name></legref> (the <defterm guid="_0c7b5323-be79-407a-b541-034ee2d7b0f9" id="sch.2-def.owner-para1.1-def.NCA" type="definition">NCA</defterm>) for which there are trustees—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7683fb4a-ae59-418c-bc2d-aad5342d6354" id="sch.2-def.owner-para1.1-para2.h-para3.i" provision.type="other"><no>(i)</no><block><txt break.before="0">if, under the NCA, the conservation park or resources reserve has trustees whose powers are not restricted—the trustees; or</txt></block></li><li guid="_24c4e861-4692-436c-af77-e8df0ec93a65" id="sch.2-def.owner-para1.1-para2.h-para3.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">otherwise—the chief executive of the department in which the NCA is administered;</txt></block></li></list></block></li><li guid="_abf9fec6-7eb4-415f-845b-b3080bbeb685" id="sch.2-def.owner-para1.1-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">for DOGIT land under the <legref check="valid" jurisd="QLD" target.doc.id="act-1991-032" target.version.series="9408f57c-9b40-4ed4-817e-ee06cee2b54e" type="act"><name emphasis="yes">Aboriginal Land Act 1991</name></legref> or the <legref check="valid" jurisd="QLD" target.doc.id="act-1991-033" target.version.series="dbdd7c1d-f4f4-4804-a544-27228a06ed09" type="act"><name emphasis="yes">Torres Strait Islander Land Act 1991</name></legref>—a trustee for the land;</txt></block></li><li guid="_64baa23c-3c7a-4325-a18b-ca1870385c61" id="sch.2-def.owner-para1.1-para2.k" provision.type="other"><no>(k)</no><block><txt break.before="0">for Torres Strait Islander land under the <legref check="valid" jurisd="QLD" target.doc.id="act-1991-033" target.version.series="dbdd7c1d-f4f4-4804-a544-27228a06ed09" type="act"><name emphasis="yes">Torres Strait Islander Land Act 1991</name></legref> that is taken to be a reserve because of <legref check="valid" jurisd="QLD" refid="sec.151" target.doc.id="act-1991-033" target.guid="_12213aac-18a5-490f-8e54-31be8400876e" target.version.series="dbdd7c1d-f4f4-4804-a544-27228a06ed09" type="act">section 151</legref><legref check="invalid" jurisd="QLD" type="act">(2)</legref> of that Act—each grantee of the land;</txt></block></li><li guid="_272d3873-9024-4927-a1ec-6ae527a975b9" id="sch.2-def.owner-para1.1-para2.l" provision.type="other"><no>(l)</no><block><txt break.before="0">for land under the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-081" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act"><name emphasis="yes">Land Act 1994</name></legref> for which there are trustees—a trustee;</txt></block></li><li guid="_e641fe96-4ed1-45a6-be48-661d1394f3dd" id="sch.2-def.owner-para1.1-para2.m" provision.type="other"><no>(m)</no><block><txt break.before="0">for transport land under the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-002" target.version.series="cf6c76a3-165d-4adb-aa9c-6eaa674ed46b" type="act"><name emphasis="yes">Transport Planning and Coordination Act 1994</name></legref>—the chief executive of the department in which that Act is administered;</txt></block></li><li guid="_beb29f0f-b0c8-4091-9a15-d7fe9f14cdd1" id="sch.2-def.owner-para1.1-para2.n" provision.type="other"><no>(n)</no><block><txt break.before="0">for land vested in the Minister administering the <legref check="valid" jurisd="QLD" target.doc.id="act-2006-039" target.version.series="1e1a0ed5-f492-44f9-ba49-f9194ef5fefb" type="act"><name emphasis="yes">Education (General Provisions) Act 2006</name></legref>—that Minister;</txt></block></li><li guid="_6d8ec5ef-7065-4602-9145-a9f3cb96f40b" id="sch.2-def.owner-para1.1-para2.o" provision.type="other"><no>(o)</no><block><txt break.before="0">for land vested in the Queensland Housing Commission or another Minister or a chief executive responsible for constructing public buildings—the Minister administering the relevant Act;</txt></block></li><li guid="_d0485d2d-5d23-45c2-abd4-68a0a0501126" id="sch.2-def.owner-para1.1-para2.p" provision.type="other"><no>(p)</no><block><txt break.before="0">for land held from the State under another Act under an interest less than fee simple (other than occupation rights under a permit under the<legref check="valid" jurisd="QLD" target.doc.id="act-1994-081" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act"><name emphasis="yes"> Land Act 1994</name></legref>)—the person who holds the interest;</txt></block></li><li guid="_56365a6f-c021-4297-8874-358478d88e3c" id="sch.2-def.owner-para1.1-para2.q" provision.type="other"><no>(q)</no><block><txt break.before="0">for any of the following land under the NCA—the State—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_340d79cf-3579-4fc7-957a-9b129b1b7581" id="sch.2-def.owner-para1.1-para2.q-para3.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a national park (scientific);</txt></block></li><li guid="_7f8ca2e1-5669-47de-a62c-d580f2e72089" id="sch.2-def.owner-para1.1-para2.q-para3.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a national park;</txt></block></li><li guid="_602c8f48-d214-4791-a8aa-0156344210af" id="sch.2-def.owner-para1.1-para2.q-para3.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">a national park (Aboriginal land);</txt></block></li><li guid="_7be841e6-a276-4a67-aa46-d80160b61ccf" id="sch.2-def.owner-para1.1-para2.q-para3.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">a national park (Torres Strait Islander land);</txt></block></li><li guid="_9d59b99f-de22-4ad8-9e1b-824b9254cf90" id="sch.2-def.owner-para1.1-para2.q-para3.v" provision.type="other"><no>(v)</no><block><txt break.before="0">a forest reserve.</txt></block></li></list></block></li></list></block></li><li guid="_64dddb09-cef9-4948-83be-820b7e5465a5" id="sch.2-def.owner-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">Also, a mortgagee of land is the <defterm guid="_cc4b79d4-f1e9-4b67-b6d2-020cf1588409" type="mention">owner </defterm>of land if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_185f0353-440a-4797-a4d5-2373fa677877" id="sch.2-def.owner-para1.2-para2.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the mortgagee is acting as mortgagee in possession of the land and has the exclusive management and control of the land; or</txt></block></li><li guid="_b317e5c6-3dc2-4bb0-b2b0-fccb6903f224" id="sch.2-def.owner-para1.2-para2.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the mortgagee or a person appointed by the mortgagee is in possession of the land and has the exclusive management and control of the land.</txt></block></li></list></block></li><li guid="_f1dd7c95-d2ce-4a1c-9409-414d6839d8e7" id="sch.2-def.owner-para1.3" provision.type="other"><no>3</no><block><txt break.before="0">If land or another thing has more than 1 owner, a reference in this Act to the owner of the land or thing is a reference to each of its owners.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_4be96dc2-e56e-48ca-bc57-1479a5c5c4eb" id="sch.2-def.PGAct_"><txt break.before="1"><defterm guid="_07b7178e-0942-425b-8416-02a11c49a1fc" id="sch.2-def.PGAct" type="definition">P&#38;G Act</defterm> see <intref check="valid" refid="sec.4" target.guid="_9c345801-c6a3-4a5e-943c-5f3a0d88039e">section 4</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_3c224173-ab60-49ff-a728-92bc0cb62324" id="sch.2-def.PGActsafetyprovisions_"><txt break.before="1"><defterm guid="_1369f94b-20b1-484f-a586-acf8eb06fd40" id="sch.2-def.PGActsafetyprovisions" type="definition">P&#38;G Act safety provisions </defterm>see <intref check="valid" refid="sec.4" target.guid="_9c345801-c6a3-4a5e-943c-5f3a0d88039e">section 4</intref><intref check="valid" refid="sec.4-para1.c" target.guid="_afea94c3-46c6-43f5-9186-7ff00ebadaa1">(c)</intref>.</txt></definition><definition affected.by.uncommenced="0" change="del" guid="_2d1bad2a-6216-4fc7-a934-74f390d62bdf-del" id="sch.2-def.parties_-del"><txt break.before="1"><defterm guid="_57af23a1-5af5-403a-91e7-6302e7169fc6-del" id="sch.2-def.parties-del" type="definition">parties</defterm>, for <intref check="valid" refid="ch.7" target.guid="_c71c8b11-e33d-4d92-93a5-6b36981ef2af">chapter 7</intref>, <intref check="valid" refid="ch.7-pt.1" target.guid="_52045836-8aa9-4370-bd20-28391b2a1028">part 1</intref>, see <intref check="valid" refid="sec.313" target.guid="_072609d3-d5da-47d7-8ae9-301c3739cc43">section 313</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_49f9ceb0-f8c3-4cc7-97ac-20c20df3b4ca" id="sch.2-def.permitrelatedapplication_"><txt break.before="1"><defterm guid="_198bc02c-898b-4679-a925-13cfd5b688ea" id="sch.2-def.permitrelatedapplication" type="definition">permit-related application</defterm> see <intref check="valid" refid="sec.113" target.guid="_11b056f3-e113-4ec7-bcbe-5e724f6136e9">section 113</intref><intref check="valid" refid="sec.113-ssec.3" target.guid="_3eb66c5b-5ac6-4c01-aca0-35064d3aea31">(3)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_6cbb9ca2-4ce3-4570-aa0d-1708128ef3a6" id="sch.2-def.petroleum_"><txt break.before="1"><defterm guid="_c3440cdf-f648-4ec7-96fb-e491007d6516" id="sch.2-def.petroleum" type="definition">petroleum</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.10" target.doc.id="act-2004-025" target.guid="_72045839-9d2e-419b-8103-da2e9f726b64" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">section 10</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_0188843f-4223-47b0-83b9-7403e926dbf9" id="sch.2-def.petroleumauthority_"><txt break.before="1"><defterm guid="_aec296ac-9d73-4268-834f-55f4859df4f5" id="sch.2-def.petroleumauthority" type="definition">petroleum authority</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.18" target.doc.id="act-2004-025" target.guid="_00606342-13a2-49f5-a337-6c1f809e1f2e" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">section 18</legref><legref check="invalid" jurisd="QLD" type="act">(2)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_52ae5bef-4f63-4348-89c3-5c3af89dcc77" id="sch.2-def.petroleumdiscovery_"><txt break.before="1"><defterm guid="_c27601e9-a0f4-4708-a8e2-8195069822a0" id="sch.2-def.petroleumdiscovery" type="definition">petroleum discovery</defterm> includes a discovery of an underground geological formation or structure that under the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref> has or is likely to have commercial potential for petroleum.</txt></definition><definition affected.by.uncommenced="0" guid="_64b1930b-9c22-4540-a800-e0b6244dce7d" id="sch.2-def.petroleumlease_"><txt break.before="1"><defterm guid="_04fc56e8-59b8-4e1d-bf79-adfa4189c293" id="sch.2-def.petroleumlease" type="definition">petroleum lease</defterm> means a petroleum lease under the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref> or a lease under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_3c707e69-35ba-4d9b-b73f-961bb1b07872" id="sch.2-def.petroleumtenure_"><txt break.before="1"><defterm guid="_f6add360-c122-4552-81d2-959a4929530f" id="sch.2-def.petroleumtenure" type="definition">petroleum tenure</defterm> means any ATP or petroleum lease.</txt></definition><definition affected.by.uncommenced="0" guid="_bd9c9088-177b-46cc-929a-3cd5c3cc857a" id="sch.2-def.pipelineland_"><txt break.before="1"><defterm guid="_68d05abe-c23c-4880-995f-b8735087aac4" id="sch.2-def.pipelineland" type="definition">pipeline land</defterm>, for a GHG tenure, means land on which pipelines are or may be constructed or operated under the tenure if the land is identified as pipeline land in any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2edd7ce8-c02a-463e-89fa-e292ec113aa6" id="sch.2-def.pipelineland-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the register;</txt></block></li><li guid="_6520f3cd-d11c-4b1a-ba4d-d9edb41f2e88" id="sch.2-def.pipelineland-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the instrument for the tenure;</txt></block></li><li guid="_582d283d-dab7-4f6b-9998-0b0d16faa8e4" id="sch.2-def.pipelineland-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the tenure is a GHG permit—the work program for the tenure;</txt></block></li><li guid="_19aa4137-f200-495d-87d1-0f97714798ee" id="sch.2-def.pipelineland-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">if the tenure is a GHG lease—the development plan for the tenure.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_d3970013-234c-45e9-a37f-84bab3dea7d9" id="sch.2-def.pipelinelicence_"><txt break.before="1"><defterm guid="_1c89db34-227f-4492-951d-70eee2570e6b" id="sch.2-def.pipelinelicence" type="definition">pipeline licence</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.18" target.doc.id="act-2004-025" target.guid="_00606342-13a2-49f5-a337-6c1f809e1f2e" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">section 18</legref><legref check="invalid" jurisd="QLD" type="act">(1)</legref><legref check="invalid" jurisd="QLD" type="act">(f)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_dc9fb4ab-6b7e-4e10-a2e9-f8590c6023ba" id="sch.2-def.place_"><txt break.before="1"><defterm guid="_cabb9cda-2c7f-427b-a6cf-0050e51d396c" id="sch.2-def.place" type="definition">place</defterm> includes land.</txt></definition><definition affected.by.uncommenced="0" guid="_b22d4f07-70d9-465d-9755-f31a0f3c0316" id="sch.2-def.planperiod_"><txt break.before="1"><defterm guid="_8a8c7bed-5e8e-46c9-bd80-daaa8a5619d1" id="sch.2-def.planperiod" type="definition">plan period</defterm>, for a development plan, means the period for which the plan applies.</txt></definition><definition affected.by.uncommenced="0" guid="_00751402-d19b-4618-a338-f03351215d80" id="sch.2-def.potentialstoragearea_"><txt break.before="1"><defterm guid="_7c7738ae-1f37-4f48-8d01-fa1923d4e2a4" id="sch.2-def.potentialstoragearea" type="definition">potential storage area</defterm>, for a GHG permit, means an area declared under <intref check="valid" refid="sec.102" target.guid="_fe02bb19-e4c6-4a70-83c5-95744af34884">section 102</intref> to be a potential storage area for the permit.</txt></definition><definition affected.by.uncommenced="0" guid="_9d30ef3a-7a09-4f54-b309-f6c211776117" id="sch.2-def.privateland_"><txt break.before="1"><defterm guid="_93e3ac1a-95ab-4d4a-9f53-f617583e8d7e" id="sch.2-def.privateland" type="definition">private land</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b0100e71-4243-401b-bdd0-b139bab123dd" id="sch.2-def.privateland-para1.1" provision.type="other"><no>1</no><block><txt break.before="0"><defterm guid="_3fb60a7a-7620-4216-b599-f106f5bb485d" type="mention">Private land</defterm> is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a58fec58-d5ad-48d3-a3cc-f6dc58546e3e" id="sch.2-def.privateland-para1.1-para2.a" provision.type="other"><no>(a)</no><block><txt break.before="0">freehold land; or</txt></block></li><li guid="_663a14f1-d754-473c-9d17-b2efc3680fef" id="sch.2-def.privateland-para1.1-para2.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an interest in land less than fee simple held from the State under another Act.</txt></block></li></list></block></li><li guid="_f8eb09f3-e0a0-4bb5-93e0-a9da64c03ab0" id="sch.2-def.privateland-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">However, land is not private land to the extent of an interest in any of the following relating to the land—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c8708a7d-0d3d-4126-88d8-25495da990f8" id="sch.2-def.privateland-para1.2-para2.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a mining interest;</txt></block></li><li guid="_11bb8464-f45b-41b2-af20-6e5cb4dd090b" id="sch.2-def.privateland-para1.2-para2.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a petroleum authority or 1923 Act petroleum tenure;</txt></block></li><li guid="_1fc2daf4-a196-46e8-9f4f-3d53f8f27ca0" id="sch.2-def.privateland-para1.2-para2.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a GHG authority;</txt></block></li><li guid="_af542bdb-9659-46cb-964a-37a26a7519fb" id="sch.2-def.privateland-para1.2-para2.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a geothermal tenure;</txt></block></li><li guid="_b6f3954d-ec4c-4d76-ba71-648de3ecb14d" id="sch.2-def.privateland-para1.2-para2.e" provision.type="other"><no>(e)</no><block><txt break.before="0">an occupation right under a permit under the<legref check="valid" jurisd="QLD" target.doc.id="act-1994-081" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act"><name emphasis="yes"> Land Act 1994</name></legref>.</txt></block></li></list></block></li><li guid="_2508de0e-55ac-4d4a-8288-d123abfb7e2b" id="sch.2-def.privateland-para1.3" provision.type="other"><no>3</no><block><txt break.before="0">Also, land owned by a public land authority is not private land.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_5e3c66f5-bebf-4340-b705-61b1e4603d75" id="sch.2-def.programperiod_"><txt break.before="1"><defterm guid="_ec5325ca-03f6-4f55-bb35-62ab4c78926e" id="sch.2-def.programperiod" type="definition">program period</defterm>, for a work program, means the period for which the program applies.</txt></definition><definition affected.by.uncommenced="0" guid="_cace381a-9fac-42d4-a8c9-6fd47fbe00fd" id="sch.2-def.provision_"><txt break.before="1"><defterm guid="_a033ac1d-63ce-43bd-a704-20a0dfb8fc0d" id="sch.2-def.provision" type="definition">provision</defterm>, of a GHG authority, means a provision of the authority as defined under <intref check="valid" refid="sec.21" target.guid="_66e89c23-a48e-45be-bcfa-e723cf1f7def">section 21</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_c0bcb8c6-19fa-4177-943a-c3e402967ad3" id="sch.2-def.publicinterest_"><txt break.before="1"><defterm guid="_9ba635f2-8126-41f3-90c5-e5481b835e2c" id="sch.2-def.publicinterest" type="definition">public interest</defterm> means a consideration of each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_84747d6a-1af8-4a04-aff9-f42f70ea5b46" id="sch.2-def.publicinterest-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">government policy;</txt></block></li><li guid="_b4f2ad47-417d-40e6-aed8-af99d0037b87" id="sch.2-def.publicinterest-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">environmental impacts;</txt></block></li><li guid="_5ca00cac-4b02-46fa-a7f7-57142953a444" id="sch.2-def.publicinterest-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">employment creation;</txt></block></li><li guid="_1bf5816b-163d-4f66-82dc-4ea06da03000" id="sch.2-def.publicinterest-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">social impacts;</txt></block></li><li guid="_9811343f-41a1-499a-88e7-d200288b1951" id="sch.2-def.publicinterest-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the overall economic benefit for the State, or a part of the State, in the short and long term;</txt></block></li><li guid="_03bba5bc-3cb3-4b5e-bdd6-4f8cfe85136b" id="sch.2-def.publicinterest-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">impacts on aesthetic, amenity or cultural values.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_b1769b3f-2dba-4d67-bb5d-504c2a33d4f7" id="sch.2-def.publicland_"><txt break.before="1"><defterm guid="_4e4bae12-6e53-44aa-a2e6-d606714694d6" id="sch.2-def.publicland" type="definition">public land</defterm> means land other than—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0e56e00b-826a-4ee2-b716-8ac9554c9600" id="sch.2-def.publicland-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">private land; or</txt></block></li><li guid="_6b5a5362-6d00-452a-8b36-a6a76883bb02" id="sch.2-def.publicland-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to the extent an interest in any of the following relates to the land—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cc7c3c8a-6396-4f8d-90ea-9148948cb880" id="sch.2-def.publicland-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a mining interest;</txt></block></li><li guid="_9bb6b0fc-c80f-4a60-9f7e-0cb883383efc" id="sch.2-def.publicland-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a petroleum authority or 1923 Act petroleum tenure;</txt></block></li><li guid="_a098e0ab-25a9-4804-85e7-7f1207da1362" id="sch.2-def.publicland-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">a GHG authority;</txt></block></li><li guid="_3399559c-4fb5-46e1-bc07-f04ff2236435" id="sch.2-def.publicland-para1.b-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">a geothermal tenure;</txt></block></li><li guid="_dbb98532-8971-4433-8ab5-a288604a36b3" id="sch.2-def.publicland-para1.b-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">an occupation right under a permit under the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-081" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act"><name emphasis="yes">Land Act 1994</name></legref>.</txt></block></li></list></block></li></list></definition><definition affected.by.uncommenced="0" guid="_19f534a8-5cfb-4cd0-a054-ccd6ef19cbe2" id="sch.2-def.publiclandauthority_"><txt break.before="1"><defterm guid="_1ef93f19-9079-46e9-9c2e-cb36a6cf64e1" id="sch.2-def.publiclandauthority" type="definition">public land authority</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6e35f150-cd36-4fab-a09d-d45c355f836c" id="sch.2-def.publiclandauthority-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for a public road—the road authority for the road; or</txt></block></li><li guid="_1180deb6-4b41-48f6-8181-2b61b9304fd6" id="sch.2-def.publiclandauthority-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if a local government or other authority is under an Act, charged with the control of the land—the local government or other authority; or</txt></block></li><li guid="_e5d4dc60-2162-4fdd-9af0-4c8e3ea87826" id="sch.2-def.publiclandauthority-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">otherwise—the chief executive of the department administering the <legref check="invalid" jurisd="QLD" type="act">Act</legref> under which entry to the land is administered.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_84ca9935-5ac9-4608-8400-2b40a890e264" id="sch.2-def.publicroad_"><txt break.before="1"><defterm guid="_81a616ea-5149-464d-910c-1def5ec4dc24" id="sch.2-def.publicroad" type="definition">public road</defterm> means an area of land that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f2783a8e-b422-4e22-8d3a-fa116cfdd196" id="sch.2-def.publicroad-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is open to or used by the public; and</txt></block></li><li guid="_1a7b8de4-d86c-4790-b70f-90f845e13dbe" id="sch.2-def.publicroad-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is developed for or has as one of its main uses—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f7f78804-9175-486d-bf1f-996834f41419" id="sch.2-def.publicroad-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the driving or riding of motor vehicles; or</txt></block></li><li guid="_a489cf59-cdf1-4ae2-a999-8415f14a263c" id="sch.2-def.publicroad-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">pedestrian traffic; and</txt></block></li></list></block></li><li guid="_e7dd9e39-e608-464f-a977-7e614594e03d" id="sch.2-def.publicroad-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">is controlled by a public road authority.</txt></block></li></list><note guid="_c765b6d4-86cd-49ff-82f8-3416a5fbbc0f" id="sch.2-def.publicroad-note" type="example"><heading guid="_6e5a46d5-934e-45cf-8b0d-bb16c9eda435" id="sch.2-def.publicroad-note-he">Examples of an area of land that may be included in a road—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_3044c33a-6253-4da6-a127-6297868ee7a7" id="sch.2-def.publicroad-note-para1" provision.type="other"><no>•</no><block><txt break.before="0">a bridge, culvert, ford, tunnel or viaduct</txt></block></li><li guid="_3ea3cba7-9ed9-4a00-8790-0d0e47e542b5" id="sch.2-def.publicroad-note-para1-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">a pedestrian or bicycle path</txt></block></li></list></block></note></definition><definition affected.by.uncommenced="0" guid="_14935ffe-4b03-4cbd-9313-d935776e973e" id="sch.2-def.publicroadauthority_"><txt break.before="1"><defterm guid="_d68b86b1-e3a2-4d3a-a40a-4753589d750c" id="sch.2-def.publicroadauthority" type="definition">public road authority</defterm>, for a public road, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_89af75f1-ed3c-4b37-8353-b909b0097eae" id="sch.2-def.publicroadauthority-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for a State-controlled road—the chief executive of the department in which the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-008" target.version.series="060a2469-1586-4719-b2aa-d22cc9ff8daf" type="act"><name emphasis="yes">Transport Infrastructure Act 1994</name></legref> is administered; or</txt></block></li><li guid="_8e3bea21-7e43-49f8-adb8-e3c50c6aa108" id="sch.2-def.publicroadauthority-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for another public road—the local government having the control of the road.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_8e507368-0ddd-45e2-8939-776ab05daadf" id="sch.2-def.publish_"><txt break.before="1"><defterm guid="_cb93c3ce-985d-4306-b90d-77dd5fdade24" id="sch.2-def.publish" type="definition">publish</defterm>, a notice, means to publish it in any of the following ways—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6d13087e-cd6a-49b3-bdb6-50313d8f4a82" id="sch.2-def.publish-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in a journal published by the department or under the Minister’s authority;</txt></block></li><li guid="_ee7e4e8b-6650-4ce2-bba4-fa318fee7a36" id="sch.2-def.publish-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">in another publication the Minister considers appropriate;</txt></block></li><li guid="_7d6e9f5c-e3da-46ee-ba19-737f806c14fe" id="sch.2-def.publish-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">on the department’s website;</txt></block></li><li guid="_c956daa3-8df6-4ec7-a289-77dc4df36b09" id="sch.2-def.publish-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">by placing it on a public notice board, established and maintained by the department at—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7f5de371-e7c9-4472-aa4c-268adb2d4213" id="sch.2-def.publish-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the department’s head office; and</txt></block></li><li guid="_d7b8bfc4-f63c-4787-bc96-cef99d6e9c25" id="sch.2-def.publish-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">other places the chief executive considers appropriate.</txt></block></li></list></block></li></list></definition><definition affected.by.uncommenced="0" guid="_16cbf32a-5b8e-4237-ab0a-f982b374dcd4" id="sch.2-def.reasonablybelieves_"><txt break.before="1"><defterm guid="_ea237201-9cbd-473f-a56f-91e1e790638e" id="sch.2-def.reasonablybelieves" type="definition">reasonably believes</defterm> means to believe on grounds that are reasonable in the circumstances.</txt></definition><definition affected.by.uncommenced="0" guid="_f3580931-ca1d-4988-944a-2a713f8ab139" id="sch.2-def.register_"><txt break.before="1"><defterm guid="_089f246c-de0d-4d3c-b2a0-f5e9d49eecc9" id="sch.2-def.register" type="definition">register</defterm> means the register kept by the chief executive under the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.197" target.doc.id="act-2014-047" target.guid="_48018fef-a45f-4bbc-886c-d4b92b0494f8" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">section 197</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_400c2c8d-9c4b-4439-874c-3c56c82f1892" id="sch.2-def.registration_"><txt break.before="1"><defterm guid="_7b7ee778-5771-410f-90c3-e08c4eca6a14" id="sch.2-def.registration" type="definition">registration</defterm>, for a dealing, means recorded in the register.</txt></definition><definition affected.by.uncommenced="0" guid="_23166c21-7a01-44de-be2d-8fe4d77f7c1f" id="sch.2-def.relevantarrangement_"><txt break.before="1"><defterm guid="_66e4afe0-5943-4e54-ae4a-8cb9d25d55f1" id="sch.2-def.relevantarrangement" type="definition">relevant arrangement</defterm>, for <intref check="valid" refid="ch.3" target.guid="_4c6bae05-4d64-4dbf-a4f3-a2736db63437">chapter 3</intref>, <intref check="valid" refid="ch.3-pt.2" target.guid="_cae2c2ed-71c1-4255-b0c3-1af07107162f">part 2</intref>, see <intref check="valid" refid="sec.118" target.guid="_caba8768-e566-46e2-9665-a52878db55fc">section 118</intref><intref check="valid" refid="sec.118-ssec.1" target.guid="_acccbdb9-9ff6-4a7d-a504-8fb7489a13bb">(1)</intref><intref check="valid" refid="sec.118-ssec.1-para1.f" target.guid="_484e016e-2548-4601-bb1a-c3c993158a43">(f)</intref><intref check="valid" refid="sec.118-ssec.1-para1.f-para2.ii" target.guid="_66a72126-07b1-437f-a010-8542ba0dd445">(ii)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_7a9e558c-7f03-4661-a3dd-d10b2b17c5b4" id="sch.2-def.relevantenvironmentalauthority_"><txt break.before="1"><defterm guid="_c1ac24b9-8488-4dc1-8fb8-aeb8f256128b" id="sch.2-def.relevantenvironmentalauthority" type="definition">relevant environmental authority</defterm>, for a GHG authority or proposed GHG authority, means an environmental authority under the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act"><name emphasis="no">Environmental Protection Act</name></legref> granted for all of the authorised activities for the GHG authority or proposed GHG authority that are environmentally relevant activities under that Act.</txt></definition><definition affected.by.uncommenced="0" guid="_ef9e6afd-2848-4898-9523-fd947878d7aa" id="sch.2-def.relevantenvironmentalcondition_"><txt break.before="1"><defterm guid="_25762233-b358-4c4e-ba9d-db8ddf63f770" id="sch.2-def.relevantenvironmentalcondition" type="definition">relevant environmental condition</defterm>, for a provision about a GHG authority or proposed GHG authority, means a condition of any relevant environmental authority for the GHG authority or proposed GHG authority.</txt></definition><definition affected.by.uncommenced="0" guid="_84094b6e-1469-4668-bebf-1b5624fc4d72" id="sch.2-def.relevantGHGtenure_"><txt break.before="1"><defterm guid="_998344cb-b683-4793-9482-49e4a17f8150" id="sch.2-def.relevantGHGtenure" type="definition">relevant GHG tenure</defterm>, for a GHG data acquisition authority or proposed GHG data acquisition authority, see <intref check="valid" refid="sec.233" target.guid="_25064f82-f49b-412a-9a07-c5c13659fe8f">section 233</intref><intref check="valid" refid="sec.233-ssec.3" target.guid="_7bf9b42d-6ab4-42e8-b76d-7f8ce6ce8fab">(3)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_b68c8a0d-713e-48ff-bb7d-e80b57f81b5f" id="sch.2-def.relevantland_"><txt break.before="1"><defterm guid="_31c02acd-8aca-4210-9fd6-6f89fc2542c2" id="sch.2-def.relevantland" type="definition">relevant land</defterm>, for a GHG lease application, means the land the subject of the application.</txt></definition><definition affected.by.uncommenced="0" guid="_e8ef4703-3d26-45ea-9fef-8909dc95ffb4" id="sch.2-def.relevantlease_"><txt break.before="1"><defterm guid="_7ee40aa4-bb43-4175-b5b4-6e15f2876298" id="sch.2-def.relevantlease" type="definition">relevant lease</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0a8e8274-7a56-479f-9388-b7458b5c7167" id="sch.2-def.relevantlease-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for a GHG lease application—see <intref check="valid" refid="sec.205" target.guid="_348769a4-9bff-4bbf-bd13-73e24e638b23">section 205</intref><intref check="valid" refid="sec.205-ssec.2" target.guid="_803fd4fc-f2ec-4792-8c58-56ae9b7d481d">(2)</intref>; or</txt></block></li><li guid="_2f44b130-872c-43c2-be4c-912a0c09070a" id="sch.2-def.relevantlease-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for a GHG coordination arrangement—see <intref check="valid" refid="sec.186" target.guid="_780d2fa6-1285-4a39-bfdf-679d36f6ee8f">section 186</intref><intref check="valid" refid="sec.186-ssec.4" target.guid="_1df88b42-9b0e-4ed0-b9df-17acff222b37">(4)</intref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_14800c0a-6ea5-4f34-828d-e07401857219" id="sch.2-def.relinquishmentcondition_"><txt break.before="1"><defterm guid="_edaa1572-909e-4360-995a-55453755b080" id="sch.2-def.relinquishmentcondition" type="definition">relinquishment condition</defterm>, for a GHG permit is the relinquishment condition under <intref check="valid" refid="sec.72" target.guid="_78fd1d26-ab60-487c-bf3b-7a576b2a3aa2">section 72</intref><intref check="valid" refid="sec.72-ssec.1" target.guid="_53dd2515-8367-493b-9f74-f143817e080c">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_86efc62f-4650-468e-8ac9-f8e43e8c93d8" id="sch.2-def.relinquishmentnotice_"><txt break.before="1"><defterm guid="_adc6b766-64f1-440a-a99e-460ead6c5d53" id="sch.2-def.relinquishmentnotice" type="definition">relinquishment notice</defterm> see <intref check="valid" refid="sec.72" target.guid="_78fd1d26-ab60-487c-bf3b-7a576b2a3aa2">section 72</intref><intref check="valid" refid="sec.72-ssec.3" target.guid="_2c8a4089-9021-4600-a325-e1fef72c9259">(3)</intref><intref check="valid" refid="sec.72-ssec.3-para1.a" target.guid="_b8e72ccf-2fd7-403a-b527-d0cdeb1198a0">(a)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_e628306c-a29a-4e9a-aa0b-70c004fe75f7" id="sch.2-def.remedialpowers_"><txt break.before="1"><defterm guid="_32c8bf42-e483-4ff6-9378-e4237675afd2" id="sch.2-def.remedialpowers" type="definition">remedial powers</defterm> see <intref check="valid" refid="sec.356" target.guid="_a963356b-31d0-46d1-ad14-0cf2ffeb6138">section 356</intref><intref check="valid" refid="sec.356-ssec.2" target.guid="_53c591bd-b6bf-4304-9637-7ece45e260ab">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_ab78fdae-a352-4b36-9881-18f008294f5e" id="sch.2-def.report_"><txt break.before="1"><defterm guid="_6809f378-90a0-4ab0-b3df-186bc91603bf" id="sch.2-def.report" type="definition">report</defterm> means a written report.</txt></definition><definition affected.by.uncommenced="0" guid="_28a03cce-4da2-43e3-bba9-421a8c9b54cd" id="sch.2-def.requiredinformation_"><txt break.before="1"><defterm guid="_2888101b-7868-40bc-b137-9b0ef4eb80bf" id="sch.2-def.requiredinformation" type="definition">required information</defterm>, for <intref check="valid" refid="ch.5" target.guid="_c200371d-7276-455f-ab31-e74d811368e1">chapter 5</intref>, <intref check="valid" refid="ch.5-pt.4" target.guid="_3c0547fd-122a-42d4-b2e8-a58e49dd221f">part 4</intref>, <intref check="valid" refid="ch.5-pt.4-div.3" target.guid="_edd8297b-d498-4cd0-9a94-c579efddb2aa">division 3</intref>, see <intref check="valid" refid="sec.260" target.guid="_9db8fa06-0627-4f68-b64d-71872c0e95f6">section 260</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_bd4c3385-1405-4866-a16f-b36ee2920e6e" id="sch.2-def.requiredway_"><txt break.before="1"><defterm guid="_40bd51b6-e70e-4f31-9b10-37ecc3c640da" id="sch.2-def.requiredway" type="definition">required way</defterm>, for giving the chief executive reports, see <intref check="valid" refid="sec.255" target.guid="_c71a3b14-1ff6-41ae-a3e2-86a31cddb36a">section 255</intref><intref check="valid" refid="sec.255-ssec.4" target.guid="_4461835e-b583-4f2b-bcd0-8be46a1c77f3">(4)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_7cd8e017-56d9-4a4a-b2af-13724a77a782" id="sch.2-def.requirementsforgrant_"><txt break.before="1"><defterm guid="_c35be1e4-b668-4df7-a082-89b16bf464e4" id="sch.2-def.requirementsforgrant" type="definition">requirements for grant </defterm>see <intref check="valid" refid="sec.117" target.guid="_f47d958c-f1e6-4adc-bc6f-f1e9d5df4606">section 117</intref><intref check="valid" refid="sec.117-ssec.1" target.guid="_e90c3345-4910-4633-8359-7e7fa963f0bc">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_0b63e70c-38b7-48eb-bcd5-f32e2769b8ed" id="sch.2-def.resourceAct_"><txt break.before="1"><defterm guid="_af802809-f756-4a7b-9592-0e7450dad20c" id="sch.2-def.resourceAct" type="definition">resource Act</defterm> see <intref check="valid" refid="sec.26A" target.guid="_a6bf8c62-2e65-43fd-acff-0e537a548018">section 26A</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_ae57ca87-34e4-4a26-9571-cc6784623e0e" id="sch.2-def.resourcemanagementdecision_"><txt break.before="1"><defterm guid="_4686b27e-8a5d-4485-af32-f070777f95e3" id="sch.2-def.resourcemanagementdecision" type="definition">resource management decision</defterm> see <intref check="valid" refid="sec.201" target.guid="_5001b0db-d88f-4070-9645-cc9ec4173b4d">section 201</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_6a22bc65-595e-45f6-923f-dbb9027d2269" id="sch.2-def.resumptionlaw_"><txt break.before="1"><defterm guid="_fedb6aaa-8e48-4380-b2cb-b8d5603b4057" id="sch.2-def.resumptionlaw" type="definition">resumption law</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_809e320f-f059-4876-a19e-815f5b657181" id="sch.2-def.resumptionlaw-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">means a law that provides for the compulsory acquisition of land, including, for example, the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_64c29b93-2d90-46bf-a30c-62b438bc9803" id="sch.2-def.resumptionlaw-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="no">ALA</name></legref>, including as applied by another law providing for an entity to take land under the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="no">ALA</name></legref> as if the entity were a constructing authority under the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="no">ALA</name></legref>;</txt><note guid="_886b9408-a886-47ca-b1a3-155af8dc990b" id="sch.2-def.resumptionlaw-para1.a-para2.i-note" type="example"><heading guid="_7c00efe3-e842-4428-a75e-dcaa301f44e4" id="sch.2-def.resumptionlaw-para1.a-para2.i-note-he">Examples of other laws for <intref check="valid" refid="sch.2-def.resumptionlaw-para1.a-para2.i" target.guid="_64c29b93-2d90-46bf-a30c-62b438bc9803">subparagraph (i)</intref>—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_a19447f7-eca4-4810-bf28-466c38d9bf37" id="sch.2-def.resumptionlaw-para1.a-para2.i-note-para3" provision.type="other"><no>•</no><block><txt break.before="0"><legref check="valid" jurisd="QLD" target.doc.id="act-1994-064" target.version.series="9906752b-4e97-4fa7-8f1e-9e2cbb7fb2b6" type="act"><name emphasis="yes">Electricity Act 1994</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.116" target.doc.id="act-1994-064" target.guid="_f87d3ceb-a856-421d-8616-2fcaed35164e" target.version.series="9906752b-4e97-4fa7-8f1e-9e2cbb7fb2b6" type="act">section 116</legref></txt></block></li><li guid="_701ed468-501c-4739-ba0e-ad50b8fcfc3d" id="sch.2-def.resumptionlaw-para1.a-para2.i-note-para3-oc.2" provision.type="other"><no>•</no><block><txt break.before="0"><legref check="valid" jurisd="QLD" target.doc.id="act-2009-046" target.version.series="823a0dc3-6c45-4400-a230-133cee0bae67" type="act"><name emphasis="yes">South-East Queensland Water (Distribution and Retail Restructuring) Act 2009</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.53AY" target.doc.id="act-2009-046" target.guid="_00611709-da73-470f-9c11-1c5a9de1918e" target.version.series="823a0dc3-6c45-4400-a230-133cee0bae67" type="act">section 53AY</legref></txt></block></li></list></block></note></block></li><li guid="_d4d12358-b04d-415a-b478-9731abe0b552" id="sch.2-def.resumptionlaw-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-081" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act"><name emphasis="yes">Land Act 1994</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.5" target.doc.id="act-1994-081" target.guid="_91196ad1-e6f1-4227-88be-219664507532" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act">chapter 5</legref>, <legref check="valid" jurisd="QLD" refid="ch.5-pt.3" target.doc.id="act-1994-081" target.guid="_bee95e24-5682-4f10-a530-b9f90f6f7bba" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act">part 3</legref>, <legref check="valid" jurisd="QLD" refid="ch.5-pt.3-div.3" target.doc.id="act-1994-081" target.guid="_0936bd0a-2e11-4ef0-86e7-77d6733b3bb2" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act">division 3</legref>;</txt></block></li><li guid="_a4a19c26-01bf-4f81-a436-d1a47487144f" id="sch.2-def.resumptionlaw-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="yes">Petroleum and Gas (Production and Safety) Act 2004</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.456" target.doc.id="act-2004-025" target.guid="_a2ae2083-a7ba-4d2b-a95d-2db6e65409cb" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">sections 456</legref> to <legref check="valid" jurisd="QLD" refid="sec.458" target.doc.id="act-2004-025" target.guid="_125a6292-9e16-44c0-815c-1762cb26e09e" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">458</legref>;</txt></block></li><li guid="_1078d054-e641-45ba-97c2-1aed6d546372" id="sch.2-def.resumptionlaw-para1.a-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-2011-001" target.version.series="d0479ffd-5564-4906-a81d-3fee31c8d91c" type="act"><name emphasis="yes">Queensland Reconstruction Authority Act 2011</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.99" target.doc.id="act-2011-001" target.guid="_3872469f-7f61-4a0c-b360-904044c401a8" target.version.series="d0479ffd-5564-4906-a81d-3fee31c8d91c" type="act">section 99</legref>;</txt></block></li><li guid="_4b534fcd-e7ba-4bda-999b-9f5df5e5d047" id="sch.2-def.resumptionlaw-para1.a-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1971-055" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" type="act"><name emphasis="no">State Development Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.82" target.doc.id="act-1971-055" target.guid="_6fb2ae53-0a2e-46bc-99d8-d6e9f1ad69a6" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" type="act">section 82</legref> or <legref check="valid" jurisd="QLD" refid="sec.125" target.doc.id="act-1971-055" target.guid="_a35d3756-3075-4f7f-8342-5db76023aece" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" type="act">125</legref>;</txt></block></li><li guid="_9f589862-6ca7-4178-875b-13078ded60a9" id="sch.2-def.resumptionlaw-para1.a-para2.vi" provision.type="other"><no>(vi)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-002" target.version.series="cf6c76a3-165d-4adb-aa9c-6eaa674ed46b" type="act"><name emphasis="yes">Transport Planning and Coordination Act 1994</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.25" target.doc.id="act-1994-002" target.guid="_cdbeb02a-d774-4504-8835-88b9bb1cfed9" target.version.series="cf6c76a3-165d-4adb-aa9c-6eaa674ed46b" type="act">section 25</legref> or <legref check="valid" jurisd="QLD" refid="sec.26" target.doc.id="act-1994-002" target.guid="_399400ab-dc67-455d-9430-644cb726de21" target.version.series="cf6c76a3-165d-4adb-aa9c-6eaa674ed46b" type="act">26</legref>; but</txt></block></li></list></block></li><li guid="_b93a19eb-8ee1-4761-ae17-aa6217a5f225" id="sch.2-def.resumptionlaw-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">does not include the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-081" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act"><name emphasis="yes">Land Act 1994</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.5" target.doc.id="act-1994-081" target.guid="_91196ad1-e6f1-4227-88be-219664507532" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act">chapter 5</legref>, <legref check="valid" jurisd="QLD" refid="ch.5-pt.3" target.doc.id="act-1994-081" target.guid="_bee95e24-5682-4f10-a530-b9f90f6f7bba" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act">part 3</legref>, <legref check="invalid" jurisd="QLD" type="act">divisions 1</legref> and <legref check="valid" jurisd="QLD" refid="ch.5-pt.3-div.2" target.doc.id="act-1994-081" target.guid="_3f183ee8-dc3e-4dd4-8a4c-27c5d206eb1b" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act">2</legref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_3ca28c1e-7bd2-4e04-bd3a-71f7bc7e53a6" id="sch.2-def.resumptionnotice_"><txt break.before="1"><defterm guid="_990905eb-fbe3-4a14-8c66-c214ceb91ba5" id="sch.2-def.resumptionnotice" type="definition">resumption notice</defterm>, for the taking of land under a resumption law, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_58189124-d0a5-4197-a66a-d4750086edb1" id="sch.2-def.resumptionnotice-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the land is taken under the process stated in the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="no">ALA</name></legref> (whether the land is taken under the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="no">ALA</name></legref> or another resumption law)—the gazette resumption notice under the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="no">ALA</name></legref> for the taking; or</txt></block></li><li guid="_f9014b4e-2099-4d6d-ad00-1e213fa7bc4d" id="sch.2-def.resumptionnotice-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—the instrument giving effect to the taking.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_060fd499-2052-4477-8896-a237275209cc" id="sch.2-def.roadusedirection_"><txt break.before="1"><defterm guid="_9f7420d7-3327-4cc2-bb9a-db1f00cccd55" id="sch.2-def.roadusedirection" type="definition">road use direction</defterm> see <intref check="valid" refid="sec.303" target.guid="_83e88723-2a1d-402e-be82-e78c1eb8cd98">section 303</intref><intref check="invalid" refid="sec.303-ssec.1">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_fe5d6398-83b3-49e0-8829-4ee6d7c2d825" id="sch.2-def.safetymanagementplan_"><txt break.before="1"><defterm guid="_61d82601-6c93-4f52-ae32-1dd9aaabf9c2" id="sch.2-def.safetymanagementplan" type="definition">safety management plan</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">P&#38;G Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sch.2" target.doc.id="act-2004-025" target.guid="_b152c1f2-c08c-4971-b4fe-7c2394e7c306" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">schedule 2</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_e9e40996-b3c1-48ec-9c95-069cd4dfec44" id="sch.2-def.satisfies_"><txt break.before="1"><defterm guid="_10de802f-fc34-44a1-8814-9a1102e2c6e2" id="sch.2-def.satisfies" type="definition">satisfies</defterm>, the capability criteria—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_933bc56a-9d8c-4889-b218-e1c95f5de431" id="sch.2-def.satisfies-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for <intref check="valid" refid="ch.2" target.guid="_60f42d8e-8fdb-4c76-a1e6-d0c7ad27b9d4">chapter 2</intref>—see <intref check="valid" refid="sec.42" target.guid="_c1ff0b2d-2444-49b4-929f-0ed640ee415a">section 42</intref><intref check="valid" refid="sec.42-ssec.3" target.guid="_36211ce0-25ee-4fc8-918f-6d523fa24a82">(3)</intref>; or</txt></block></li><li guid="_8207eed0-9773-4eab-9ca3-ca916c87ff1e" id="sch.2-def.satisfies-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for <intref check="valid" refid="ch.3" target.guid="_4c6bae05-4d64-4dbf-a4f3-a2736db63437">chapter 3</intref>—see <intref check="valid" refid="sec.118" target.guid="_caba8768-e566-46e2-9665-a52878db55fc">section 118</intref><intref check="valid" refid="sec.118-ssec.3" target.guid="_e4828f75-85ce-4373-b565-2cd83235c31f">(3)</intref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_9bd8279b-3f09-4ee7-8281-79d0c59e0ada" id="sch.2-def.security_"><txt break.before="1"><defterm guid="_58196b58-b00c-48f8-9d16-695fbd3df8f3" id="sch.2-def.security" type="definition">security </defterm>includes a bond, deposit of an amount as security, guarantee, indemnity or other surety, insurance, mortgage and undertaking.</txt></definition><definition affected.by.uncommenced="0" guid="_f11d8db4-8fd9-4cc4-9d12-0a76fd3161da" id="sch.2-def.serioussituation_"><txt break.before="1"><defterm guid="_72baf898-1cff-46a8-a0dd-84bb5ba9f83c" id="sch.2-def.serioussituation" type="definition">serious situation </defterm>see <intref check="valid" refid="sec.363" target.guid="_1fe268eb-a505-4708-8648-2110ccbaf8af">section 363</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_84824109-be82-414a-b6d6-a1921af001f2" id="sch.2-def.serioussituationdirection_"><txt break.before="1"><defterm guid="_d7a19777-1939-46ef-9feb-486f2d11c8ea" id="sch.2-def.serioussituationdirection" type="definition">serious situation direction </defterm>see <intref check="valid" refid="sec.364" target.guid="_577f9a3f-8e22-426b-9cf1-31fde7a434b1">section 364</intref><intref check="valid" refid="sec.364-ssec.2" target.guid="_5d678731-2a3d-4a4c-9db3-8c8975e01d4b">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_66fc047d-aa0a-4edd-8ac5-be966edfdc24" id="sch.2-def.servicesoftheState_"><txt break.before="1"><defterm guid="_49524816-30d2-498e-9c28-975bf4c8e72f" id="sch.2-def.servicesoftheState" type="definition">services of the State</defterm> has the same meaning that the term has in relation to the State of Queensland under the <legref check="invalid" jurisd="CTH" type="act"><name emphasis="yes">Copyright Act 1968</name> (Cwlth)</legref>, <legref check="invalid" jurisd="CTH" type="act">section 183</legref><legref check="invalid" jurisd="CTH" type="act">(1)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_5212c8f7-c69d-4369-b24d-bc5cfea2a8c1" id="sch.2-def.share_"><txt break.before="1"><defterm guid="_fd3af9d3-fee3-4b13-b8a3-09e4947af5fd" id="sch.2-def.share" type="definition">share</defterm>, of a GHG authority, means any interest held by a person as a holder of the authority in all of the area of the authority.</txt></definition><definition affected.by.uncommenced="0" guid="_14a3313d-33ad-465d-9496-68e7e504b984" id="sch.2-def.specialcriteria_"><txt break.before="1"><defterm guid="_3b733944-2b38-482c-9a56-52c6bf476d0a" id="sch.2-def.specialcriteria" type="definition">special criteria</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2a21721a-3095-4c70-80df-741917ad4c08" id="sch.2-def.specialcriteria-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for a GHG permit—see <intref check="valid" refid="sec.33" target.guid="_f0ad3da8-2ce3-40a0-b87b-acd049d31664">section 33</intref><intref check="valid" refid="sec.33-ssec.2" target.guid="_7d636d93-6fe1-4eb6-8137-69b5204d12c1">(2)</intref><intref check="valid" refid="sec.33-ssec.2-para1.b" target.guid="_da7459d7-8ebf-412f-836c-51ad9aac9e37">(b)</intref>; or</txt></block></li><li guid="_b34ae424-b00f-4390-af95-1d7112b7558d" id="sch.2-def.specialcriteria-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for a GHG lease—see <intref check="valid" refid="sec.125" target.guid="_18a4cbb6-460e-491a-af4e-66cfb9a26f90">section 125</intref><intref check="valid" refid="sec.125-ssec.2" target.guid="_ee55496a-de9b-4c62-9842-25dd11aae18b">(2)</intref>b).</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_abc2d2f7-24b0-4692-a21f-a43d835d3f43" id="sch.2-def.Statecontrolledroad_"><txt break.before="1"><defterm guid="_4618455d-c63b-445e-b369-25115cd8d5a7" id="sch.2-def.Statecontrolledroad" type="definition">State-controlled road</defterm> see <legref check="valid" jurisd="QLD" target.doc.id="act-1994-008" target.version.series="060a2469-1586-4719-b2aa-d22cc9ff8daf" type="act"><name emphasis="yes">Transport Infrastructure Act 1994</name></legref>, <legref check="valid" jurisd="QLD" refid="sch.6" target.doc.id="act-1994-008" target.guid="_8f92dfc8-8640-4c01-8835-c09330c3ee8a" target.version.series="060a2469-1586-4719-b2aa-d22cc9ff8daf" type="act">schedule 6</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_b19dc787-6c2a-4597-84ed-47930844087d" id="sch.2-def.StateDevelopmentAct_"><txt break.before="1"><defterm guid="_21460b1e-9031-46df-bf91-62a69f1a9aa0" id="sch.2-def.StateDevelopmentAct" type="definition">State Development Act</defterm> means the <legref check="valid" jurisd="QLD" target.doc.id="act-1971-055" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" type="act"><name emphasis="yes">State Development and Public Works Organisation Act 1971</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_b1731988-2c44-4e4c-a5f5-84ca2ce22bc1" id="sch.2-def.storagecapacity_"><txt break.before="1"><defterm guid="_c3991950-cab5-43e1-8751-4fe9eb6c9225" id="sch.2-def.storagecapacity" type="definition">storage capacity</defterm>, of a GHG storage reservoir, means the measure of its potential for GHG stream storage.</txt></definition><definition affected.by.uncommenced="0" guid="_11fdc361-7f9a-493a-9772-e18381379572" id="sch.2-def.storagecommencementday_"><txt break.before="1"><defterm guid="_2235f9d7-07c7-42e9-9db0-48a90b52a827" id="sch.2-def.storagecommencementday" type="definition">storage commencement day</defterm>, for a GHG lease, see <intref check="valid" refid="sec.120" target.guid="_fcda669d-b9d0-4f90-b99b-7bf477b46c2b">section 120</intref><intref check="valid" refid="sec.120-ssec.2" target.guid="_a7f744a4-6e60-49b5-b793-5316da878010">(2)</intref><intref check="valid" refid="sec.120-ssec.2-para1.c" target.guid="_49f0e504-d5c2-44d3-bd62-b569b2ec98e4">(c)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_e7fa9146-246d-48ca-8bdd-942c0718eaf0" id="sch.2-def.structure_"><txt break.before="1"><defterm guid="_f67e4e71-3b54-43d1-af8a-07f90effaa92" id="sch.2-def.structure" type="definition">structure</defterm> means anything built or constructed, whether or not attached to land.</txt></definition><definition affected.by.uncommenced="0" guid="_8480db72-e4eb-456e-8bd0-194c4011da2f" id="sch.2-def.subblock_"><txt break.before="1"><defterm guid="_ce3c7376-fff4-4f04-b206-96132180c5d4" id="sch.2-def.subblock" type="definition">sub-block</defterm> see <intref check="valid" refid="sec.26" target.guid="_51d5ebcf-f335-44c2-a05e-f563ea9a4e7f">section 26</intref><intref check="valid" refid="sec.26-ssec.2" target.guid="_968c6cd9-7ada-4e93-a44b-2ce35384048d">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_35a52508-016b-4cce-b0b5-cd9fd95a7b9f" id="sch.2-def.submission_"><txt break.before="1"><defterm guid="_b2d0cd41-fdd1-4ad9-9102-6b730018b9fc" id="sch.2-def.submission" type="definition">submission </defterm>means a written submission.</txt></definition><definition affected.by.uncommenced="0" guid="_186c9f2c-d9dd-42a6-8c18-0f2fd2328a91" id="sch.2-def.surrenderapplication_"><txt break.before="1"><defterm guid="_f6095dae-cfcf-49d5-b53b-67b102494fdc" id="sch.2-def.surrenderapplication" type="definition">surrender application</defterm> see <intref check="valid" refid="sec.174" target.guid="_326c7813-f962-45d2-93e2-4c95ae2cef14">section 174</intref><intref check="valid" refid="sec.174-para1.a" target.guid="_e7cf6939-8491-4baf-97d1-76b0c949a0bf">(a)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_10596ebf-8817-4544-9493-328e04cfe63e" id="sch.2-def.take_"><txt break.before="1"><defterm guid="_77f3061b-599a-478f-9c1c-e835acf71fec" id="sch.2-def.take" type="definition">take</defterm>, in relation to land, includes acquire.</txt></definition><definition affected.by.uncommenced="0" guid="_0edc5626-5913-40e1-96e3-85caec0b1ced" id="sch.2-def.unavailableland_"><txt break.before="1"><defterm guid="_16096dc2-1e6d-441a-93a7-947bae1c14a1" id="sch.2-def.unavailableland" type="definition">unavailable land</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d8c9c70c-3b14-45cf-8e75-70297cfa8783" id="sch.2-def.unavailableland-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for a GHG permit—see <intref check="valid" refid="sec.44" target.guid="_bc0debf2-95b9-432d-bf68-8c80bb7e0084">section 44</intref><intref check="valid" refid="sec.44-ssec.4" target.guid="_c7297fd8-e6c8-452e-abc4-6b244782b68f">(4)</intref>; or</txt></block></li><li guid="_fe72bf17-cd37-4f4d-bb70-84ffa970eda6" id="sch.2-def.unavailableland-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for a GHG lease—see <intref check="valid" refid="sec.135" target.guid="_555d3ed6-a512-415d-a2a4-5f8fdaf4080d">section 135</intref><intref check="valid" refid="sec.135-ssec.4" target.guid="_d951c526-bfe8-417e-a6f0-766f5ac20f42">(4)</intref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_2be8a78c-13d2-4a6f-89bc-c2fe9a969384" id="sch.2-def.WaterAct_"><txt break.before="1"><defterm guid="_d124bb83-31b6-4d42-bbb2-c06e74bc5b19" id="sch.2-def.WaterAct" type="definition">Water Act</defterm> means the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="yes">Water Act 2000</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_adfbcdb1-419d-4f29-ab19-4697a709a194" id="sch.2-def.WaterActMinister_"><txt break.before="1"><defterm guid="_3a29c9bd-7019-4ad4-8046-048378e65bf2" id="sch.2-def.WaterActMinister" type="definition">Water Act Minister</defterm> means the Minister of the department in which the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref> is administered.</txt></definition><definition affected.by.uncommenced="0" guid="_04ed3524-ea8c-4d42-a63f-cc024a157c8f" id="sch.2-def.workprogram_"><txt break.before="1"><defterm guid="_b5a5f5cc-0c53-4276-8438-dc44edc75357" id="sch.2-def.workprogram" type="definition">work program</defterm>, for a GHG permit, see <intref check="valid" refid="sec.24" target.guid="_1c719659-fcb8-4c2b-8de4-7cf04970e90c">section 24</intref><intref check="valid" refid="sec.24-ssec.1" target.guid="_f7157766-6142-493a-9f07-5b72a94e66cd">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_3d77240c-076d-4dcb-9304-1ed4e6d44ed2" id="sch.2-def.workprogramcriteria_"><txt break.before="1"><defterm guid="_cd6d2aea-1468-4d17-b931-9f35fc562bf1" id="sch.2-def.workprogramcriteria" type="definition">work program criteria</defterm> see <intref check="valid" refid="sec.55" target.guid="_35a2e740-d43b-4895-835d-bb2272afeda8">section 55</intref><intref check="valid" refid="sec.55-ssec.2" target.guid="_7e40f9f0-e6c1-438b-8048-aef472ee0e35">(2)</intref>.</txt></definition></deflist></block></schedule></schedules></act>