<?xml version="1.0" encoding="utf-8"?>
<!DOCTYPE act PUBLIC "-//OQPC//DTD QuILLS Act//EN" "Act.dtd">
<!--************************************************************************************************************-->
<!--                                              DISCLAIMER                                                    -->
<!---->
<!--Queensland does not accept responsibility for the accuracy or completeness of material on this website      -->
<!--(or any other website referred to on this website) except as set out below. Users should exercise their     -->
<!--own skill and care in the use of the material.                                                              -->
<!---->
<!--No warranty is given that the material located on this site, or on any other site referred to on this site, -->
<!--is free from error or omission. Users should exercise their own skill and care with respect to the use of   -->
<!--the material. Accordingly, the State of Queensland and its servants and agents expressly disclaim liability -->
<!--for any act done or omission made in reliance on any such material and any consequences of any such act or  -->
<!--omission. This notice must not be erased.                                                                   -->
<!---->
<!--************************************************************************************************************-->
<act amending="none" assent.date="2004-10-12T00:00:00+10:00" first.valid.date="2019-07-01T00:00:00+10:00" id="act-2004-025" in.force="allinforce" no="25" print.type="speciallabel:act-2004-025" special.label="bill-2019-043" title="Petroleum and Gas (Production and Safety) Act 2004" type="act" version.desc.id="b810615a-62ad-4977-b238-f450e953d357" version.series.id="04733898-22fc-46eb-9266-ad7b447b75ba" year.assent="2004" publication.date="2020-02-14"><coverdata guid="_36b28b15-9184-426e-9289-548809f244a6" id="cd"><statusrecord guid="_70622c1d-8551-4134-9827-af07c96d9e4c-del" id="cd-status-del"><heading change="delReplace" guid="_092df4d3-1789-4978-b67b-1682c06b343b-del" id="cd-status-he-del"/><block><txt break.before="1"><del/></txt></block></statusrecord><statusrecord guid="_aae0a9a6-c2bd-41c2-8209-030bf798dbfd" id="cd-status"><heading change="insReplace" guid="_c4a5c25e-3f6d-460a-8a0c-336ef4f2e264" id="cd-status-he">Indicative reprint note</heading><block><txt break.before="1"><ins xml:space="preserve">This is an <bi>unofficial</bi> version of a reprint of this Act that incorporates all proposed amendments to the Act included in the Mineral and Energy Resources and Other Legislation Amendment Bill 2020. This indicative reprint has been prepared for information only—<bi>it is not an authorised reprint of the Act</bi>.</ins></txt><txt break.before="1"><ins/></txt></block><block><txt break.before="1"><ins xml:space="preserve">Enacted but uncommenced amendments included in the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="yes">Land, Explosives and Other Legislation Amendment Act 2019</name></legref> No. 7 and the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="yes">Natural Resources and Other Legislation Amendment Act 2019</name></legref> No. 17 have also been incorporated in this indicative reprint.</ins></txt><txt break.before="1"><ins/></txt></block><block><txt break.before="1"><ins xml:space="preserve">Proposed amendments to this Act are also included in the Resources Safety and Health Queensland Bill 2019. This indicative reprint incorporates these amendments to allow subsequent proposed amendments in the Mineral and Energy Resources and Other Legislation Amendment Bill 2020 to be incorporated.</ins></txt><txt break.before="1"><ins/></txt></block><block><txt break.before="1"><ins xml:space="preserve">Further proposed amendments to this Act are included in the Natural Resources and Other Legislation (GDA2020) Amendment Bill 2019. These proposed amendments are not included in this indicative reprint.</ins></txt><txt break.before="1"><ins/></txt></block><block><txt break.before="1"><ins xml:space="preserve">The point-in-time date for this indicative reprint is the introduction date for the Mineral and Energy Resources and Other Legislation Amendment Bill 2020—4 February 2020.</ins></txt><txt break.before="1"><ins/></txt></block><block><txt break.before="1"><ins xml:space="preserve">Detailed information about indicative reprints is available on the <b>Information</b> page of this website.</ins></txt><txt break.before="1"><ins/></txt></block></statusrecord></coverdata><wrapper><front guid="_7606839b-165d-4ba1-9ba4-4a1e4a2f184b" id="frnt"><shorttitle guid="_64aefc5e-b8cc-43d5-a67f-66ca7e4f89d8" id="frnt-st">Petroleum and Gas (Production and Safety) Act 2004</shorttitle><longtitle guid="_0ed6646f-3c41-4cef-9f19-22457bba4cd6" id="frnt-lt"><block><txt break.before="1">An Act about exploring for, recovering and transporting by pipeline, petroleum and fuel gas and ensuring the safe and efficient carrying out of those activities, and for other purposes</txt></block></longtitle></front><body numbering.style="manual"><chapter affected.by.uncommenced="0" guid="_9fa221c9-58cb-4643-a6e8-9d0b9509b444" id="ch.1"><no>Chapter 1</no><heading guid="_859d80ab-bd62-4768-b589-9f5185948cae" id="ch.1-he">Preliminary</heading><part affected.by.uncommenced="0" guid="_5c2d9a5f-d460-4a13-b8f8-79f426cc2607" id="ch.1-pt.1"><no>Part 1</no><heading guid="_e43e94cd-9dbb-4753-a035-f34e997225e8" id="ch.1-pt.1-he">Introduction</heading><clause affected.by.uncommenced="0" guid="_48d17886-f166-454c-9753-71a27eddc541" id="sec.1" provision.type="other" spent.amends="0"><no>1</no><heading guid="_d6ce0dd6-97d5-4edc-9039-673e4df7dff1" id="sec.1-he">Short title</heading><block><txt break.before="1">This Act may be cited as the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="yes">Petroleum and Gas (Production and Safety) Act 2004</name></legref>.</txt></block><note guid="_bcdce0bc-80aa-4c85-89d0-2b4b8d8fb182" id="sec.1-note" type="example"><heading change="ins" guid="_0a30abd7-c71b-427a-b8e3-870fb6987ca6" id="sec.1-note-he">Editor’s notes—</heading><block><list number.type="default" unnumbered.indent="0"><li change="ins" guid="_8db94ba8-7d0a-4118-8304-9a99a299409c" id="sec.1-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">Uncommenced amendments to the following provisions have been included in this indicative reprint—</txt><list number.type="bull" unnumbered.indent="0"><li guid="_cbfced61-58e0-4e71-bcbc-b84dcc2b77d9" id="sec.1-note-para1.1-para2" provision.type="other"><no>•</no><block><txt break.before="0">sections 18, 670, 708A, 730, 731, 733, 734A, 734AA, 789, 790, 814, 814A, 834, 998–1000</txt></block></li><li guid="_08be5cba-4039-408d-8564-e106604b1ccc" id="sec.1-note-para1.1-para2-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">chapter 9, part 6, division 3, subdivisions 1–2 headings, chapter 9, part 6A</txt></block></li><li guid="_585abf9f-87fb-48d9-b984-0f5563a592f3" id="sec.1-note-para1.1-para2-oc.3" provision.type="other"><no>•</no><block><txt break.before="0">schedules 1 and 2.</txt></block></li></list></block><block><txt break.before="1">See 2019 Act No. 7 pt 12 div 3 (other than ss 277–283), sch 1 (other than amendments 1–4).</txt></block></li><li change="ins" guid="_e62d9ae2-b258-4680-8cca-df9acf9d7acb" id="sec.1-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">Uncommenced amendments to the following provisions have been included in this indicative reprint—</txt><list number.type="bull" unnumbered.indent="0"><li guid="_b23d11f3-f815-4364-8f71-71bb4bc1f43c" id="sec.1-note-para1.2-para2" provision.type="other"><no>•</no><block><txt break.before="0">sections 35, 41, 42, 42A, 46, 47, 48, 51, 52, 53, 56, 57, 59, 62, 64A, 65, 66, 68, 70, 78, 84, 85, 89, 90, 105, 107A, 107D, 168, 173, 332, 352</txt></block></li><li guid="_d33294c4-559a-4244-bcd2-151131678fdd" id="sec.1-note-para1.2-para2-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">chapter 2, part 1, division 3, subdivision 1 and subdivision 7, chapter 2, part 1, division 8, subdivision 2A, chapter 2, part 2, division 7, subdivision 1A, chapter 15, part 24</txt></block></li><li guid="_e1acb47d-496f-4a53-8080-0d710e7d9603" id="sec.1-note-para1.2-para2-oc.3" provision.type="other"><no>•</no><block><txt break.before="0">schedules 1, 2.</txt></block></li></list></block><block><txt break.before="1">See 2019 Act No. 17 ch 5 pt 2.</txt></block></li><li change="ins" guid="_3458be04-6554-4e70-bbc6-bd4ec3a08780" id="sec.1-note-para1.3" provision.type="other"><no>3</no><block><txt break.before="0">Proposed amendments included in the Resources Safety and Health Queensland Bill 2019 to the following provisions have been incorporated into this indicative reprint—</txt><list number.type="bull" unnumbered.indent="0"><li guid="_a7dce86c-4db7-4475-9e23-42912121a8e6" id="sec.1-note-para1.3-para2" provision.type="other"><no>•</no><block><txt break.before="0">sections 734AC, 735, 737, 738, 741, 742, 773, 774, 813, 817, 834, 837, 837A–837C, 841A, 851A, 857</txt></block></li><li guid="_b8df991e-4293-4871-b7a4-799e3c950b9c" id="sec.1-note-para1.3-para2-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">chapter 15, part 26</txt></block></li><li guid="_2b303193-224c-47ef-83ad-c12f321d9c2e" id="sec.1-note-para1.3-para2-oc.3" provision.type="other"><no>•</no><block><txt break.before="0">schedule 2.</txt></block></li></list></block></li></list></block></note></clause><clause affected.by.uncommenced="0" guid="_2bb97499-5ce4-41b5-89ad-cdf57da67ac0" id="sec.2" provision.type="other" spent.amends="0"><no>2</no><heading guid="_c9c77d92-58cc-4aba-9b75-5cad48b72d4a" id="sec.2-he">Commencement</heading><subclause affected.by.uncommenced="0" guid="_1d7c18fe-eb5f-48c9-9b3c-4f250902d36e" id="sec.2-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0"><intref check="valid" refid="sec.968" target.guid="_cfbdd58e-b665-4ed9-b6a7-a8bc88ad43c4">Section 968</intref>, to the extent it inserts <intref check="invalid" refid="pt.19">part 19</intref>, <intref check="invalid" refid="pt.19-div.6">division 6</intref>, <intref check="invalid" refid="pt.19-div.6-sdiv.1">subdivisions 1</intref> and <intref check="invalid" refid="pt.19-div.6-sdiv.2">2</intref> in the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref> commences on the date of assent.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_49f6de0b-4e49-4478-9758-44fbf73e7576" id="sec.2-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Otherwise, this Act commences on a day to be fixed by proclamation.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_c21dae53-6ecc-4b84-8388-58d61441fe21" id="ch.1-pt.2"><no>Part 2</no><heading guid="_f8beb676-85a5-48e3-a752-f5a40e687a66" id="ch.1-pt.2-he">Purpose and application of Act</heading><clause affected.by.uncommenced="0" guid="_21eecc58-0404-4272-8373-06a31b838529" id="sec.3" provision.type="other" spent.amends="0"><no>3</no><heading guid="_1ba18326-1b3b-4be5-abf5-4ecd419d6c13" id="sec.3-he">Main purpose of Act</heading><subclause affected.by.uncommenced="0" guid="_e9858cdf-5f4e-472d-816d-9fdf157ed4ed" id="sec.3-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The main purpose of this Act is to facilitate and regulate the carrying out of responsible petroleum activities and the development of a safe, efficient and viable petroleum and fuel gas industry, in a way that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_75a67b26-f806-44d4-be51-907ba4ec9291" id="sec.3-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">manages the State’s petroleum resources—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_68759127-7b15-49b9-9475-145c3dc43330" id="sec.3-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">in a way that has regard to the need for ecologically sustainable development; and</txt></block></li><li guid="_c8844b3a-a822-4184-adc5-457771fb4fa9" id="sec.3-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">for the benefit of all Queenslanders; and</txt></block></li></list></block></li><li guid="_d68b141e-74a5-431c-b800-b8ab010c419e" id="sec.3-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">enhances knowledge of the State’s petroleum resources; and</txt></block></li><li guid="_97a8c76e-6a43-46ec-9ad2-ae0ed89f4195" id="sec.3-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">creates an effective and efficient regulatory system for the carrying out of petroleum activities and the use of petroleum and fuel gas; and</txt></block></li><li guid="_3c00b458-b5b1-4c3a-9c7e-fb183e708c9b" id="sec.3-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">encourages and maintains an appropriate level of competition in the carrying out of petroleum activities; and</txt></block></li><li guid="_e80b6383-5741-4e2d-adc4-7bc15a786a10" id="sec.3-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">creates an effective and efficient regulatory system for the construction and operation of pipelines; and</txt></block></li><li guid="_a1e974ac-5e5e-4aaf-9171-96436014957d" id="sec.3-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">ensures petroleum activities are carried on in a way that minimises conflict with other land uses; and</txt></block></li><li guid="_54d6e5f1-1afa-4606-9253-5a9378779bf1" id="sec.3-ssec.1-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">optimises coal seam gas production and coal or oil shale mining in a safe and efficient way; and</txt></block></li><li guid="_0ceb2ed9-76ad-4205-a795-7e67c4803ed0" id="sec.3-ssec.1-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">appropriately compensates owners or occupiers of land; and</txt></block></li><li guid="_ae0650c0-9fcb-4f72-a320-ff5927b91fa1" id="sec.3-ssec.1-para1.i" provision.type="other"><no>(i)</no><block><txt break.before="0">encourages responsible land management in the carrying out of petroleum activities; and</txt></block></li><li guid="_e8111b57-9d83-49f7-b1b6-97e0c64f4f4f" id="sec.3-ssec.1-para1.j" provision.type="other"><no>(j)</no><block><txt break.before="0">facilitates constructive consultation with people affected by activities authorised under this Act; and</txt></block></li><li guid="_d4bf5abb-1621-4203-a3cb-1863a1d6c72b" id="sec.3-ssec.1-para1.k" provision.type="other"><no>(k)</no><block><txt break.before="0">regulates and promotes the safety of persons in relation to operating plant.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_912a5806-2753-49f7-8221-aeff6e249a6d" id="sec.3-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_5cb57bcb-7fff-433d-988c-1bb9b412308e" id="sec.3-ssec.2-def.petroleumactivities_"><txt break.before="1"><defterm guid="_75c3d713-6e35-4302-a114-6fb410696133" id="sec.3-ssec.2-def.petroleumactivities" type="definition">petroleum activities</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cbac15dd-b229-4641-bd69-bcf786ce6816" id="sec.3-ssec.2-def.petroleumactivities-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the exploration, distillation, production, processing, refining, storage and transport of petroleum; and</txt></block></li><li guid="_feeb19c0-75ee-4e66-b9e5-9c7053e74b98" id="sec.3-ssec.2-def.petroleumactivities-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the distillation, production, processing, refining, storage and transport of fuel gas; and</txt></block></li><li guid="_683a13da-dceb-4067-aa39-d3b547d4f39b" id="sec.3-ssec.2-def.petroleumactivities-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">authorised activities for petroleum authorities; and</txt></block></li><li guid="_c9b3a119-9da4-41a2-b63a-92bc796ae7f5" id="sec.3-ssec.2-def.petroleumactivities-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">other activities authorised under this Act for petroleum authorities.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8db3ba2e-1e4b-4c82-999a-291c337f26ff" id="sec.3A" provision.type="other" spent.amends="0"><no>3A</no><heading guid="_30320a31-d634-446b-b155-504fc50ec443" id="sec.3A-he">Secondary purpose—facilitation of <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Energy Act 2010</name></legref> and <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">Greenhouse Gas Storage Act 2009</name></legref></heading><subclause affected.by.uncommenced="0" guid="_5f0d231d-181a-4233-8c19-2535c18febbf" id="sec.3A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Another purpose of this Act is to facilitate the operation of the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="yes">Geothermal Energy Act 2010</name></legref> (the <defterm guid="_3752d3d3-d00b-4d97-8544-cfc404162bfe" id="sec.3A-def.GeothermalAct" type="definition">Geothermal Act</defterm>) and the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="yes">Greenhouse Gas Storage Act 2009</name></legref> (the <defterm guid="_b59b330e-0164-4057-b710-f13ee965ea88" id="sec.3A-def.GHGstorageAct" type="definition">GHG storage Act</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_32942a22-079c-423e-ac43-57ec9766013f" id="sec.3A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref> is facilitated by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f2a14ece-6dc4-43da-b704-9086ff9832ae" id="sec.3A-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">applying provisions of this Act about safety to particular authorised activities for geothermal tenures under that Act; and</txt></block></li><li guid="_b7e0fef0-8f14-44cc-b3ec-eea58f66ca91" id="sec.3A-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">applying provisions of this Act about investigations and some of its provisions about enforcement for that Act.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9b4200be-b95d-482b-b734-82175e2c3145" id="sec.3A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref> is facilitated by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_080fdcc7-a600-425d-9b57-ece7bdcbbd75" id="sec.3A-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">providing for survey licences to be able to be granted for potential pipelines for GHG streams; and</txt></block></li><li guid="_aa43cb7a-bbef-4e7e-bff3-f681c7b22f2c" id="sec.3A-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">providing for pipeline licences to be able to granted for GHG streams; and</txt></block></li><li guid="_604b2635-676b-4718-a93d-ba492a120f61" id="sec.3A-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">applying provisions of this Act about safety to particular authorised activities for authorities under that Act; and</txt></block></li><li guid="_e9fb72dc-8e6a-410a-a450-e4db31b43acc" id="sec.3A-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">applying provisions of this Act about investigations and some of its provisions about enforcement for that Act.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_905381b8-62ec-489a-993a-5c8c10f80223" id="sec.4" provision.type="other" spent.amends="0"><no>4</no><heading guid="_8fbe6fff-b018-430a-b66a-e2de2068a975" id="sec.4-he">Act binds all persons</heading><subclause affected.by.uncommenced="0" guid="_07b6aaee-d648-4b33-ac79-fdd549cbfd67" id="sec.4-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This Act binds all persons, including the State, and, to the extent the legislative power of the Parliament permits, the Commonwealth and the other States.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6bb7f7b6-3779-427a-a7d6-d288c61ecc85" id="sec.4-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the Commonwealth or a State can not be prosecuted for an offence against this Act.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7c90b12a-5d50-4089-a23c-407012a427c3" id="sec.5" provision.type="other" spent.amends="0"><no>5</no><heading guid="_09a476e2-99ac-4785-9600-41d8c2eb656d" id="sec.5-he">Application of Act to coastal waters of the State</heading><subclause affected.by.uncommenced="0" guid="_4f9efb5d-b1eb-41be-ae2d-645791bed78c" id="sec.5-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This Act applies to the coastal waters of the State as if the coastal waters of the State were part of the State.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a4bae480-8cba-43d5-8e5f-79c08564d4e8" id="sec.5-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, this Act does not apply to the adjacent area under the <legref check="valid" jurisd="QLD" target.doc.id="act-1982-022" target.version.series="2d2296dc-4b3d-4b9d-b087-19dba1900a67" type="act"><name emphasis="yes">Petroleum (Submerged Lands) Act 1982</name></legref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_6c6a5ac8-799d-44d8-9fef-34a0d04ecce2" id="sec.6" provision.type="other" spent.amends="0"><no>6</no><heading guid="_28b60e45-c7fb-4117-9f1a-c7cb93493025" id="sec.6-he">Relationship with <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref></heading><subclause affected.by.uncommenced="0" guid="_72257e34-b58a-4869-897d-b1bc4a3b74c0" id="sec.6-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section does not apply to a coal or oil shale mining tenement.</txt><note guid="_bbf1f61c-a3d8-47be-aa14-d32418723a53" id="sec.6-ssec.1-note" type="example"><heading guid="_bf416e8a-4e97-489d-87a2-3bf5a0c08cac" id="sec.6-ssec.1-note-he">Note—</heading><block><txt break.before="1">See also the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.3A" target.doc.id="act-1989-110" target.guid="_92b7d86f-dc1d-45cc-834b-b9a571e716d2" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 3A</legref> (Relationship with petroleum legislation).</txt></block><block><txt break.before="1">For the relationship between this Act and the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref> in relation to coal or oil shale mining tenements, see <intref check="valid" refid="ch.3" target.guid="_7d989cb7-da2a-4737-842c-bd1944dbb54e">chapter 3</intref> (Provisions for coal seam gas).</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_736c56eb-6dbb-464b-b8a2-825c80446389" id="sec.6-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref> does not limit or otherwise affect—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8492aa96-f282-4e3d-ac52-4e5169ef04db" id="sec.6-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the power to grant or renew a petroleum authority over land (the <defterm guid="_6fc08810-7d72-4570-ad68-46b995320fec" id="sec.6-ssec.2-def.overlappingland" type="definition">overlapping land</defterm>) in the area of a mining tenement; or</txt></block></li><li guid="_c0078351-2eb9-4ed0-97c6-2fa9bc14fe0d" id="sec.6-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a petroleum authority already granted over land (also the <defterm guid="_746bff64-dc88-4421-9dac-dd2dfb08a657" id="sec.6-ssec.2-def.overlappingland-oc.2" type="definition">overlapping land</defterm>) in the area of an existing mining tenement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d2309f75-3aba-4928-a3b9-713330acc2e6" id="sec.6-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_25d9624a-dbe3-40c5-afd1-7ff435142929" id="sec.6-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the petroleum authority is a pipeline licence or petroleum facility licence—it is subject to <intref check="valid" refid="sec.400" target.guid="_908050e4-a541-4069-85eb-0436d71a7c9e">section 400</intref> or <intref check="valid" refid="sec.440" target.guid="_552bff25-cb12-496c-8d63-c1c161996264">440</intref>; and</txt></block></li><li guid="_5adf374c-0b5c-45a5-8bdd-117c8afb6721" id="sec.6-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the petroleum authority is another type of petroleum authority—it is subject to <intref check="valid" refid="sec.6-ssec.4" target.guid="_0381a390-0e76-44be-8435-49e0d8629884">subsections (4)</intref> to <intref check="valid" refid="sec.6-ssec.6" target.guid="_212d07a5-0f77-4089-b2ab-73dfe0931e93">(6)</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0381a390-0e76-44be-8435-49e0d8629884" id="sec.6-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the mining tenement is a mining lease (other than a transportation mining lease), an authorised activity for the petroleum authority may be carried out on the overlapping land only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_323c314a-a416-46c6-98c5-daa0c9b1ed04" id="sec.6-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the mining lease holder has agreed in writing to the carrying out of the activity; and</txt></block></li><li guid="_b67625e5-fbae-4771-b08e-cb8105c80879" id="sec.6-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a copy of the agreement has been lodged; and</txt><note guid="_565345ce-708e-457e-bf41-cbd1f5a9634b" id="sec.6-ssec.4-para1.b-note" type="example"><heading guid="_2980c6de-1d3a-4640-99d5-b27f2265bc8c" id="sec.6-ssec.4-para1.b-note-he">Note—</heading><block><txt break.before="1">For other relevant provisions about lodging documents, see <intref check="valid" refid="sec.851AA" target.guid="_1bb215c0-29c7-436b-85d1-d8220a60416c">section 851AA</intref>.</txt></block></note></block></li><li guid="_c3f3671e-a56c-4fcd-8cd6-c93f373b0b84" id="sec.6-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the agreement is still in force.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_67bd9840-58d2-4807-ae84-0a186e8ee7da" id="sec.6-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the mining tenement is an exploration permit, mineral development licence or transportation mining lease and the petroleum authority is an authority to prospect, an authorised activity for the petroleum authority may be carried out on the overlapping land only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_626be878-bc7b-4c55-ba0d-7f190a34739c" id="sec.6-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the mining tenement holder has agreed in writing to the carrying out of the activity, a copy of the agreement has been lodged and the agreement is still in force; or</txt></block></li><li guid="_db645262-5deb-4b15-a3ca-26bf1122da87" id="sec.6-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">carrying out the activity does not adversely affect the carrying out of an authorised activity for the tenement that has already started.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_212d07a5-0f77-4089-b2ab-73dfe0931e93" id="sec.6-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">If the mining tenement is an exploration permit or a mineral development licence and the petroleum authority is a petroleum lease, an authorised activity for the mining tenement may be carried out on the overlapping land only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_26732bc4-bcba-4929-a349-c712b6fef370" id="sec.6-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the petroleum lease holder has agreed in writing to the carrying out of the activity; and</txt></block></li><li guid="_75f86f3e-9c18-4253-a908-75a80a94898e" id="sec.6-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a copy of the agreement has been lodged; and</txt></block></li><li guid="_50378d0c-90c7-42cc-8281-9ac0d76ea3d3" id="sec.6-ssec.6-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the agreement is still in force.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_98193950-9081-4f16-a48b-037c06ac6b55" id="sec.6-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_b5cb2964-969d-4ce0-a495-37677a4c2d73" id="sec.6-ssec.7-def.transportationmininglease_"><txt break.before="1"><defterm guid="_ee22904a-fde4-4800-9f43-8f7bd1a1d316" id="sec.6-ssec.7-def.transportationmininglease" type="definition">transportation mining lease</defterm> means a mining lease granted under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.316" target.doc.id="act-1989-110" target.guid="_e7a2ef73-62b6-4f57-9da3-a30fdfccbc65" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 316</legref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_61be8c4c-1fb3-41ac-9887-8851fe789a23" id="sec.6A" provision.type="other" spent.amends="0"><no>6A</no><heading guid="_463f5ce5-ff4a-40dc-ac6f-0eddb3d22c62" id="sec.6A-he">Relationship with <legref check="valid" jurisd="QLD" target.doc.id="act-1992-020" target.version.series="5a5e324b-388d-450f-843c-b363ee68996c" type="act"><name emphasis="no">Nature Conservation Act 1992</name></legref></heading><block><txt break.before="1">This Act is subject to the <legref check="valid" jurisd="QLD" target.doc.id="act-1992-020" target.version.series="5a5e324b-388d-450f-843c-b363ee68996c" type="act"><name emphasis="yes">Nature Conservation Act 1992</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.27" target.doc.id="act-1992-020" target.guid="_01ee9ee2-da0a-472b-acd4-b862f349600a" target.version.series="5a5e324b-388d-450f-843c-b363ee68996c" type="act">sections 27</legref> and <legref check="valid" jurisd="QLD" refid="sec.70QA" target.doc.id="act-1992-020" target.guid="_9da441d1-0dd0-4d22-9202-e77c603f721d" target.version.series="5a5e324b-388d-450f-843c-b363ee68996c" type="act">70QA</legref>.</txt></block></clause><clause affected.by.uncommenced="0" guid="_44554710-bca0-4837-b3bd-3b825da2cf74" id="sec.6B" provision.type="other" spent.amends="0"><no>6B</no><heading guid="_5db5bcc1-ac28-4933-921f-7a95ba542b60" id="sec.6B-he">Relationship with <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref> and <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref></heading><block><txt break.before="1">The relationship between this Act, the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref> and the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref> and authorities under them is provided for under—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a6417eb9-70bf-413e-9df9-05a1f3bc94e0" id="sec.6B-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0"><legref check="invalid" jurisd="QLD" refid="ch.3A" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act">chapter 3A</legref>; and</txt></block></li><li guid="_1b2dfac0-3316-41b7-ba09-bc10b30abef1" id="sec.6B-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.5" target.doc.id="act-2010-031" target.guid="_18ab3134-f9ef-4b7d-a156-de3b91cceaa3" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act">chapter 5</legref>; and</txt></block></li><li guid="_941aaab0-493a-4e53-86cb-98a89ba2c3db" id="sec.6B-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.4" target.doc.id="act-2009-003" target.guid="_faefc638-342e-43b0-a5ed-6ae7a9f9a690" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act">chapter 4</legref>.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_0c84032e-d787-4f05-a473-c632c25103c2" id="sec.6BA" provision.type="other" spent.amends="0"><no>6BA </no><heading guid="_f07033e0-4ac3-4904-9667-bddff36d5a9a" id="sec.6BA-he">Relationship with <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref></heading><block><txt break.before="1">The relationship between this Act and the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref> is provided for under the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.6" target.doc.id="act-2014-047" target.guid="_959e052d-dfd4-4033-a165-1e1e468f5490" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">section 6</legref>.</txt></block></clause><clause affected.by.uncommenced="0" guid="_38ead537-1184-4e40-9df5-90cf7af45a98" id="sec.6C" provision.type="other" spent.amends="0"><no>6C</no><heading guid="_7bb27e90-c8d1-4fb7-a71a-958e50f6a052" id="sec.6C-he">Declaration for Commonwealth Act</heading><block><txt break.before="1">A petroleum authority is declared not to be personal property under the <legref check="invalid" jurisd="CTH" type="act"><name emphasis="yes">Personal Property Securities Act 2009</name> (Cwlth)</legref>.</txt></block></clause><clause affected.by.uncommenced="0" guid="_84241f5b-0951-4c27-91d5-ce581fe257d2" id="sec.7" provision.type="other" spent.amends="0"><no>7</no><heading guid="_3111982f-5829-4e2a-8333-b3bc07976920" id="sec.7-he">Act does not affect other rights or remedies</heading><subclause affected.by.uncommenced="0" guid="_0fac1d4f-07f8-46fd-b39a-c820d62d6044" id="sec.7-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.294" target.guid="_b1326749-a36f-43d9-a9a7-e177045010d0">sections 294</intref>, <intref check="valid" refid="sec.563A" target.guid="_33053f67-a856-4e64-8671-e3f6441a4f7e">563A</intref> and <intref check="valid" refid="sec.856" target.guid="_f5016573-42e6-4369-b03d-fb203abb5183">856</intref> and <intref check="valid" refid="ch.3" target.guid="_7d989cb7-da2a-4737-842c-bd1944dbb54e">chapter 3</intref>, <intref check="valid" refid="ch.3-pt.8" target.guid="_7848573e-9ea5-49cb-a174-595b65c98b82">part 8</intref>, this Act does not affect or limit a civil right or remedy that exists apart from this Act, whether at common law or otherwise.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d43f709d-e919-4c33-9d0d-b337db53e08a" id="sec.7-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.7-ssec.1" target.guid="_0fac1d4f-07f8-46fd-b39a-c820d62d6044">subsection (1)</intref>, compliance with this Act does not necessarily show that a civil obligation that exists apart from this Act has been satisfied or has not been breached.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6f8f31de-7f65-4ee9-961d-fa60e621a2d3" id="sec.7-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In addition, a breach of an obligation under this Act does not, of itself, give rise to an action for breach of statutory duty or another civil right or remedy.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c0292809-38c2-4ba3-a739-b19d991c95db" id="sec.7-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">This Act does not limit a court’s powers under the <legref check="valid" jurisd="QLD" target.doc.id="act-1992-048" target.version.series="6bcfc277-3e30-47e3-a34f-9379b3cd284a" type="act"><name emphasis="yes">Penalties and Sentences Act 1992</name></legref> or another law.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f6de11d3-fea5-4004-8db4-75de643dcfd9" id="sec.8" provision.type="other" spent.amends="0"><no>8</no><heading guid="_68633ccf-9090-4072-8855-3e07aa673958" id="sec.8-he">Native title</heading><subclause affected.by.uncommenced="0" guid="_1f36e14e-dc7a-4d29-8c32-b865935bea30" id="sec.8-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies for applying this Act to land where native title exists.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4a095695-e57c-42df-bfd3-aacb8b8798b3" id="sec.8-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A native title holder within the meaning of the <legref check="invalid" jurisd="CTH" type="act"><name emphasis="no">Commonwealth Native Title Act</name></legref>, <legref check="invalid" jurisd="CTH" refid="sec.224" type="act">section 224</legref> has the procedural and other rights that the holder has under that Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_327d5e30-e0ce-4511-9f0b-ffab56a5af60" id="sec.8-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0"><intref check="valid" refid="sec.8-ssec.2" target.guid="_4a095695-e57c-42df-bfd3-aacb8b8798b3">Subsection (2)</intref> applies despite any other provision of this Act.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_26b42829-d0ba-493c-bb4e-8d6123ba137f" id="ch.1-pt.3"><no>Part 3</no><heading guid="_98a1b8fd-2246-40ce-8bcb-18a47b4ed98c" id="ch.1-pt.3-he">Interpretation</heading><division affected.by.uncommenced="0" guid="_661d2678-9918-461e-9307-5b1152d67f79" id="ch.1-pt.3-div.1"><no>Division 1</no><heading guid="_93d60e32-7072-4a1d-9e10-2cc19b845e7d" id="ch.1-pt.3-div.1-he">Dictionary</heading><clause affected.by.uncommenced="0" guid="_993ab369-4586-4a7b-b44a-c6a240050cff" id="sec.9" provision.type="other" spent.amends="0"><no>9</no><heading guid="_64be7420-520c-409a-8fe7-3fa00860203a" id="sec.9-he">Definitions</heading><block><txt break.before="1">The dictionary in <intref check="valid" refid="sch.2" target.guid="_b152c1f2-c08c-4971-b4fe-7c2394e7c306">schedule 2</intref> defines particular words used in this Act.</txt></block></clause></division><division affected.by.uncommenced="0" guid="_0ae3751b-7460-4daf-93ad-ea9d9c4b19cd" id="ch.1-pt.3-div.2"><no>Division 2</no><heading guid="_3d62f024-ab93-4698-ad82-a971309100e6" id="ch.1-pt.3-div.2-he">Key definitions</heading><clause affected.by.uncommenced="0" guid="_72045839-9d2e-419b-8103-da2e9f726b64" id="sec.10" provision.type="other" spent.amends="0"><no>10</no><heading guid="_e4c73a19-9dcd-4b12-8502-ebc91efe2b78" id="sec.10-he">Meaning of <defterm guid="_741481d7-c80c-42f7-9788-659c2bf23c37" type="mention">petroleum</defterm></heading><subclause affected.by.uncommenced="0" guid="_4124af81-4b56-4972-9e43-1559204a1006" id="sec.10-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0"><defterm guid="_c272d1e6-3e0f-478f-bd09-eee224d75b23" id="sec.10-def.Petroleum" type="definition">Petroleum</defterm> is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cb895409-0dd6-4788-9aee-4e23fada25da" id="sec.10-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a substance consisting of hydrocarbons that occur naturally in the earth’s crust; or</txt></block></li><li guid="_e4604553-346e-4207-b27a-7b765ae4270b" id="sec.10-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a substance necessarily extracted or produced as a by-product of extracting or producing a hydrocarbon mentioned in <intref check="valid" refid="sec.10-ssec.1-para1.a" target.guid="_cb895409-0dd6-4788-9aee-4e23fada25da">paragraph (a)</intref>; or</txt></block></li><li guid="_f93e29c3-3a02-4939-9f3e-37e065497e67" id="sec.10-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a fluid that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7114747f-043d-4241-ba77-bb4655ed086e" id="sec.10-ssec.1-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">is extracted or produced from coal or oil shale by a chemical or thermal process or that is a by-product of that process; and</txt></block></li><li guid="_cff641a3-b68a-431b-92a6-5e1142015c4c" id="sec.10-ssec.1-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">consists of, or includes, hydrocarbons; or</txt></block></li></list><note guid="_580ab91a-d3ba-4b8e-87a9-671dcea2a135" id="sec.10-ssec.1-para1.c-note" type="example"><heading guid="_db1dda1d-6c75-4a59-be45-b4953a485577" id="sec.10-ssec.1-para1.c-note-he">Example of a fluid that is petroleum under <intref check="valid" refid="sec.10-ssec.1-para1.c" target.guid="_f93e29c3-3a02-4939-9f3e-37e065497e67">paragraph (c)</intref>—</heading><block><txt break.before="1">mineral (f)</txt></block></note></block></li><li guid="_3857af7c-829a-49d5-a7d9-7eb7456e0af8" id="sec.10-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">another substance prescribed under a regulation, consisting of, or including, hydrocarbons; or</txt></block></li><li guid="_8fb35d3b-fe7f-4826-a890-2785e6eed8fd" id="sec.10-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">a gas, that occurs naturally in the earth’s crust, as prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9ace598d-e861-4ebf-8a6e-5492b3d434ab" id="sec.10-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A substance mentioned in <intref check="valid" refid="sec.10-ssec.1" target.guid="_4124af81-4b56-4972-9e43-1559204a1006">subsection (1)</intref><intref check="valid" refid="sec.10-ssec.1-para1.c" target.guid="_f93e29c3-3a02-4939-9f3e-37e065497e67">(c)</intref> is a <defterm guid="_28ea135e-7a64-4499-a49a-38ff19f514e3" id="sec.10-def.gasificationorretortingproduct" type="definition">gasification or retorting product</defterm>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c1725d53-928c-4c3f-b382-9bf6b64d5e97" id="sec.10-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">To remove any doubt, it is declared that <defterm guid="_a543c846-38cf-44dd-a632-8f6de5ab285b" id="sec.10-def.petroleum-oc.2" type="definition">petroleum</defterm> does not include any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a88f2310-5c67-4e0b-9a5d-1b2646b724a4" id="sec.10-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">alginite;</txt></block></li><li guid="_b9b1189e-584a-4846-bb92-6d1cecf02c78" id="sec.10-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">coal;</txt></block></li><li guid="_e588237c-2c68-4efd-b22e-d15949361ca4" id="sec.10-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">lignite;</txt></block></li><li guid="_9b64e41f-1340-4cce-a70f-75c64a35f059" id="sec.10-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">peat;</txt></block></li><li guid="_deb4e8af-2360-4b85-971a-94d5a3ee27b0" id="sec.10-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">oil shale;</txt></block></li><li guid="_ffb249cf-b178-49ce-a1cf-1a29c4d949dc" id="sec.10-ssec.3-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">torbanite;</txt></block></li><li guid="_e8f18ca5-2f39-439a-9790-48253ac7a7eb" id="sec.10-ssec.3-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">water.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_44453acd-63c9-4573-84b5-94ed0e95c69a" id="sec.10-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A substance does not cease to be petroleum merely because it is injected or reinjected into a natural underground reservoir.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2608ad57-d7b6-4b0d-8bba-82f37d7b6f40" id="sec.10-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">To remove any doubt, it is declared that, for this Act and petroleum authorities under it, this section preserves, for this Act, the effect of <legref check="valid" jurisd="QLD" refid="sec.150" target.doc.id="act-1923-026" target.guid="_d672f6db-fbdf-48e6-b62e-e3631f891535" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act">section 150</legref><legref check="invalid" jurisd="QLD" type="act">(2)</legref> and <legref check="invalid" jurisd="QLD" type="act">(3)</legref> of the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7066ecd7-a434-4174-b908-85051b227d63" id="sec.10-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_b673a6aa-c043-4413-a433-ba415840621a" id="sec.10-ssec.6-def.hydrocarbon_"><txt break.before="1"><defterm guid="_6644e3eb-1750-442d-be09-67e31a332af3" id="sec.10-ssec.6-def.hydrocarbon" type="definition">hydrocarbon</defterm> means a hydrocarbon in a gaseous, liquid, or solid state.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c9cf5fe6-8bf6-4377-8158-7ec71eb91206" id="sec.11" provision.type="other" spent.amends="0"><no>11</no><heading guid="_4d58dd0c-6288-4d3a-85b4-6919cc64debb" id="sec.11-he">Meaning of <defterm guid="_3ab64139-e1f4-465d-96fc-a0d5fe1791b1" type="mention">LPG</defterm> and <defterm guid="_d4c85025-8379-4265-8b09-b62b99a390a4" type="mention">fuel gas</defterm></heading><subclause affected.by.uncommenced="0" guid="_2faa8b67-8b21-4195-b5f8-55207675b902" id="sec.11-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0"><defterm guid="_4cf7c7ac-1b24-497a-976f-c5293d2b4c54" id="sec.11-def.LPG-oc.2" type="definition">LPG</defterm>, also called ‘LP gas’ and ‘liquefied petroleum gas’, is a substance that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ad03adb1-da5f-46e7-9078-44a32b878e28" id="sec.11-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is in a gaseous state at standard temperature and pressure; and</txt></block></li><li guid="_83c80af1-b20e-4a77-a8be-4f0d43eaf680" id="sec.11-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is predominately propane, propylene or butane; and</txt></block></li><li guid="_2fab34c2-cad8-4f5f-9011-c68b269d9100" id="sec.11-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">has been processed to be suitable for use by consumers.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5d05a89f-cbe7-47c7-bb0b-5ea39a0494d3" id="sec.11-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><defterm guid="_88455fd7-850a-4095-9df6-c378e3e8ee93" id="sec.11-def.Fuelgas" type="definition">Fuel gas</defterm> is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ec8776bc-cd60-4022-8668-910a10bf9771" id="sec.11-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">LPG; or</txt></block></li><li guid="_6d9e100f-76ed-4bc4-aa58-136510a59cc6" id="sec.11-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">processed natural gas; or</txt></block></li><li guid="_fc66ad40-e0c2-45cb-8d80-da9c6ea29d1d" id="sec.11-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">another substance prescribed under a regulation that is similar to LPG or processed natural gas.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f0b98b29-176d-40c3-84d1-97e3c17856af" id="sec.11-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_5c7de766-4175-4b3a-bd3c-889d6ac1fb58" id="sec.11-ssec.3-def.processednaturalgas_"><txt break.before="1"><defterm guid="_f0e1b256-405c-4b62-b4a3-e8540700a30e" id="sec.11-ssec.3-def.processednaturalgas" type="definition">processed natural gas</defterm> means a substance that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b8f79897-6b15-460b-91e2-b402b09003e4" id="sec.11-ssec.3-def.processednaturalgas-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is in a gaseous state at standard temperature and pressure; and</txt></block></li><li guid="_3e7fdc03-39fb-4b86-a4ce-1795405f66cc" id="sec.11-ssec.3-def.processednaturalgas-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">consists of naturally occurring hydrocarbons and other substances; and</txt></block></li><li guid="_d31c714b-964b-4443-8d5b-59554a1dd0eb" id="sec.11-ssec.3-def.processednaturalgas-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">is more than half, by volume, methane; and</txt></block></li><li guid="_7642da7a-0e6d-4e78-87ae-072fe13cad46" id="sec.11-ssec.3-def.processednaturalgas-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">has been processed to be suitable for use by consumers of fuel gas.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_ed35db1c-d3f9-4b15-92c5-242d2d9745b0" id="sec.11-ssec.3-def.standardtemperatureandpressure_"><txt break.before="1"><defterm guid="_88294087-ae54-4ea4-b07f-865e51fcc58b" id="sec.11-ssec.3-def.standardtemperatureandpressure" type="definition">standard temperature and pressure</defterm> means an absolute pressure of 101.325kPa at a temperature of 15&#186;C.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e70f162e-af12-4cd5-8352-b5f6ed852aee" id="sec.12" provision.type="other" spent.amends="0"><no>12</no><heading guid="_44b6c021-f9df-46a9-abe8-78ce6cac72b4" id="sec.12-he">What is a <defterm guid="_c9d401d5-e95f-42fe-98aa-4071812405ca" type="mention">prescribed storage gas</defterm></heading><block><txt break.before="1">A <defterm guid="_82cf005b-1b35-4ffa-9830-b7e4b329db4c" id="def.prescribedstoragegas" type="definition">prescribed storage gas</defterm> is any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_21de9e11-dcd8-4a10-b990-22432b4cebf3" id="sec.12-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a gas associated with, or that results from, petroleum production;</txt><note guid="_cf375f05-8c1f-48b8-af07-3d87682cafcd" id="sec.12-para1.a-note" type="example"><heading guid="_7173b8a6-0834-49c0-b6a7-d351d1170d43" id="sec.12-para1.a-note-he">Example—</heading><block><txt break.before="1">fuel gas produced at a processing plant</txt></block></note></block></li><li guid="_272fa0c7-a9fb-419e-b17d-3629277e7563" id="sec.12-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">another gas prescribed under a regulation as being suitable for storage in a natural underground reservoir.</txt><note guid="_66e8d9dd-18da-4c55-8086-1c1442ce18ac" id="sec.12-para1.b-note" type="example"><heading guid="_9cca85a0-6364-4f71-9e9e-338fca9d11e6" id="sec.12-para1.b-note-he">Example of gases suitable for storage in a natural underground reservoir—</heading><block><txt break.before="1">gases produced from a waste disposal tip</txt></block></note></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_1ab292d4-1231-47ba-bcd2-ad46b146d4aa" id="sec.13" provision.type="other" spent.amends="0"><no>13</no><heading guid="_05aa1876-08be-4c62-8b87-b53a7bad8159" id="sec.13-he">What is a <defterm guid="_63bc5c68-2d4e-4fff-81b3-413f4ab0d950" type="mention">natural underground reservoir</defterm></heading><subclause affected.by.uncommenced="0" guid="_9db37077-afe8-46f4-9684-88865c7e3569" id="sec.13-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A <defterm guid="_af8905b9-3d4c-4e80-b7a8-6f2c9cd8f2ce" id="sec.13-def.naturalundergroundreservoir-oc.2" type="definition">natural underground reservoir</defterm> is a part of a geological formation or structure—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a8a8cc8d-1d72-475e-84bd-becd44c70039" id="sec.13-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in which petroleum or another gas prescribed under a regulation has accumulated; or</txt></block></li><li guid="_718b8363-4b2c-4e03-a0a4-aa1aa38fa9ea" id="sec.13-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that is suitable to store petroleum or a prescribed storage gas.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_dc90c23a-31ff-47c6-a17e-0ac7d6528df5" id="sec.13-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A geological formation or structure mentioned in <intref check="valid" refid="sec.13-ssec.1" target.guid="_9db37077-afe8-46f4-9684-88865c7e3569">subsection (1)</intref> does not cease to be a natural underground reservoir merely because it has been modified for petroleum production or storage or to store a prescribed storage gas.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_16e80849-6b38-457f-a879-a1a8b1c4dbf4" id="sec.13-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_7f060921-5e75-4c95-b387-1ce5a76be573" id="sec.13-ssec.3-def.geologicalformation_"><txt break.before="1"><defterm guid="_b3df25c8-ec6e-4d3b-8b2f-5d678e48f449" id="sec.13-ssec.3-def.geologicalformation" type="definition">geological formation</defterm> includes a coal seam.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_27e70f0e-91ad-4518-9592-7e100347f361" id="sec.14" provision.type="other" spent.amends="0"><no>14</no><heading guid="_adb0fd63-734c-4397-bab9-5f3f0fd960f6" id="sec.14-he">What is <defterm guid="_5a961a4d-c83e-42c8-9a56-8607b278b45c" type="mention">exploring</defterm> for petroleum</heading><block><txt break.before="1"><defterm guid="_45a6745b-02d5-48f5-9b42-0ffeb6df4ac4" id="def.Exploring" type="definition">Exploring</defterm>, for petroleum, is carrying out an activity for the purpose of finding petroleum or natural underground reservoirs.</txt><note guid="_9815d88a-19ab-4ea4-87ba-5b36626f8769" id="sec.14-note" type="example"><heading guid="_c7cfde5a-e166-41b7-9457-6880b597aff7" id="sec.14-note-he">Examples—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_442f3254-66fd-4075-9aac-edfeb068b17e" id="sec.14-note-para1" provision.type="other"><no>•</no><block><txt break.before="0">conducting a geochemical, geological or geophysical survey</txt></block></li><li guid="_799cadbc-7200-4a22-976e-b985cba6c63a" id="sec.14-note-para1-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">drilling a well</txt></block></li><li guid="_a135d9f9-624e-4a2d-901e-e46de5c07c2d" id="sec.14-note-para1-oc.3" provision.type="other"><no>•</no><block><txt break.before="0">carrying out testing in relation to a well</txt></block></li><li guid="_b77f033a-8a21-4a0c-bab5-0a227b0f2640" id="sec.14-note-para1-oc.4" provision.type="other"><no>•</no><block><txt break.before="0">taking a sample for chemical or other analysis</txt></block></li></list></block></note></block></clause><clause affected.by.uncommenced="0" guid="_3d48db0b-7c52-45ec-b197-5f9305ee58cf" id="sec.15" provision.type="other" spent.amends="0"><no>15</no><heading guid="_a5868d13-9ad8-493e-a7ac-569902a7c0ec" id="sec.15-he">When petroleum is <defterm guid="_d518e899-ab75-46ab-bf66-67782ac5c137" type="mention">produced</defterm></heading><subclause affected.by.uncommenced="0" guid="_75585367-b91e-4cd5-b4d5-fa822408d9f1" id="sec.15-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Petroleum is <defterm guid="_f3346419-150c-4803-8e20-e58ca7b46894" id="sec.15-def.produced-oc.2" type="definition">produced</defterm> when it is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_86ecc2e8-282c-4b78-aaf1-2e783fd847d4" id="sec.15-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">recovered to ground level from a natural underground reservoir in which it has been contained; or</txt></block></li><li guid="_a0f04990-45f1-4ba5-8823-bd301b274157" id="sec.15-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">released to ground level from a natural underground reservoir from which it is extracted.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8ee33374-959c-47a9-9dea-d4ac36a5e01e" id="sec.15-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If, under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref> a coal or oil shale mining lease holder mines coal seam gas, for this Act, the lease holder <defterm guid="_2f59df1a-d0fd-4686-982a-007319739f9b" id="sec.15-def.produces" type="definition">produces</defterm> it.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2ba386e8-5535-4255-9a5f-19ce762e5913" id="sec.15A" provision.type="other" spent.amends="0"><no>15A</no><heading guid="_777c7314-06a3-45e5-aa6d-ed57000fedd9" id="sec.15A-he">What is <defterm guid="_f46782b1-d496-4384-8291-153ef9982ead" type="mention">produced water</defterm></heading><subclause affected.by.uncommenced="0" guid="_f65bf90e-e672-4531-8cb8-bb4f270b749a" id="sec.15A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0"><defterm guid="_ca4476c5-c67f-4dea-a14b-cc22542ac4f0" id="sec.15A-def.Producedwater" type="definition">Produced water</defterm> is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ca6222b4-fd79-49bb-bd5d-ea9171d40bb8" id="sec.15A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">CSG water; or</txt></block></li><li guid="_7b68bb7e-e3c9-4134-8237-4c92b5f3d5e3" id="sec.15A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">associated water for a petroleum tenure.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0093dfb6-d12d-48c2-8ee9-1e9906777b59" id="sec.15A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A reference to <defterm guid="_6fffe32e-24a5-42a1-84b2-6f7b29ded877" id="sec.15A-def.producedwater-oc.2" type="definition">produced water</defterm> includes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_509674a2-7807-4d05-b644-3420646ee80c" id="sec.15A-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">treated and untreated CSG water; and</txt></block></li><li guid="_4620ca81-3b44-439d-831a-c1fe00a2da5b" id="sec.15A-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">concentrated saline water produced during the treatment of CSG water.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_78b3e1f4-de3e-4047-b212-fc9d0c03967e" id="sec.16" provision.type="other" spent.amends="0"><no>16</no><heading guid="_48721f2b-1c7f-4e97-ab76-c4ec27f826c0" id="sec.16-he">What is a <defterm guid="_59ca2d2e-077b-4610-bced-4cb94c0b0f62" type="mention">pipeline</defterm></heading><subclause affected.by.uncommenced="0" guid="_87412e00-7185-4847-bc7c-9743225b45a5" id="sec.16-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A <defterm guid="_9b2bfd50-1718-494f-bccf-e499fc3f05f9" id="sec.16-def.pipeline-oc.2" type="definition">pipeline</defterm> is a pipe, or system of pipes, for transporting—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4284068b-525c-4cb2-8dee-7f445a2382ed" id="sec.16-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">generally—petroleum, fuel gas, produced water or prescribed storage gases; and</txt></block></li><li guid="_3db8ab97-2d68-4363-82ef-3c7c1e1a7a6f" id="sec.16-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">GHG streams; and</txt></block></li><li guid="_16535336-f30a-4380-85a9-8537e850d914" id="sec.16-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">substances prescribed under <intref check="valid" refid="sec.402" target.guid="_162af7e9-4ec5-415a-92d5-f4bf364cfe65">section 402</intref>.</txt></block></li></list><note guid="_88988e56-3c54-489c-a90c-d41077d36fed" id="sec.16-ssec.1-note" type="example"><heading guid="_7eee2e55-e36a-456f-aaa5-ca0323ae6c2e" id="sec.16-ssec.1-note-he">Note—</heading><block><txt break.before="1">There is no automatic right to use a pipeline for a substance mentioned in <intref check="valid" refid="sec.16-ssec.1-para1.b" target.guid="_3db8ab97-2d68-4363-82ef-3c7c1e1a7a6f">paragraph (b)</intref> or <intref check="valid" refid="sec.16-ssec.1-para1.c" target.guid="_16535336-f30a-4380-85a9-8537e850d914">(c)</intref>. A condition of a pipeline licence may extend the licence holder’s rights to include those substances. See <intref check="valid" refid="sec.401" target.guid="_0741738d-27f0-4420-91c6-dfbec69fdbe6">sections 401</intref> and <intref check="valid" refid="sec.402" target.guid="_162af7e9-4ec5-415a-92d5-f4bf364cfe65">402</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_6adc79ad-f551-4858-ae12-296593396bfe" id="sec.16-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A reference to a <defterm guid="_9c7d92ad-3e12-4ae5-8364-8980c803e5b6" id="sec.16-def.pipeline-oc.3" type="definition">pipeline</defterm> includes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8a967227-2073-4f26-bcac-ef4335635f8d" id="sec.16-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a part of the pipeline, including the pipeline’s end points; and</txt></block></li><li guid="_0c57d9e7-1e0c-4d6b-9a0b-dc44355878ef" id="sec.16-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a thing connected to or associated with the pipeline that is necessary for its operation.</txt><note guid="_4f6d2849-1563-479c-bb8c-0531d754f38c" id="sec.16-ssec.2-para1.b-note" type="example"><heading guid="_d2defeed-8900-48c9-be39-e740f38abffe" id="sec.16-ssec.2-para1.b-note-he">Examples of things that may be included in a reference to a pipeline—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_9e906b4b-41e8-40aa-ac7f-16e444212f34" id="sec.16-ssec.2-para1.b-note-para2" provision.type="other"><no>•</no><block><txt break.before="0">meter stations, scraper stations, valve stations, pumping stations or compressor stations</txt></block></li><li guid="_b4efeefa-cd0f-4049-a4d9-ddc4c37e2b52" id="sec.16-ssec.2-para1.b-note-para2-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">plant and equipment, machinery and tanks</txt></block></li><li guid="_179a8041-cf4f-4dcd-b6ea-739a3f54341b" id="sec.16-ssec.2-para1.b-note-para2-oc.3" provision.type="other"><no>•</no><block><txt break.before="0">corrosion protection apparatus</txt></block></li><li guid="_c0858fc9-582c-47bb-9be8-bf88b54133bf" id="sec.16-ssec.2-para1.b-note-para2-oc.4" provision.type="other"><no>•</no><block><txt break.before="0">communications equipment and towers</txt></block></li></list></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8b1a4dc0-dec3-4d45-954a-edc0c0215c87" id="sec.16-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A pipeline’s <defterm guid="_3df274fa-f5e6-4858-8a42-f87c75fa826f" id="sec.16-def.endpoints" type="definition">end points</defterm> are—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4180fdb0-4a5d-45a7-875b-fd03972d9bfa" id="sec.16-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the pipeline has not operated for the first time—the points at which a substance mentioned in <intref check="valid" refid="sec.16-ssec.1" target.guid="_87412e00-7185-4847-bc7c-9743225b45a5">subsection (1)</intref> will enter or exit the pipeline on the day the pipeline first operates; or</txt></block></li><li guid="_fdf706af-ad74-46ec-9f21-4f888ecdc39a" id="sec.16-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—the points at which the substance enters or exits the pipeline.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c49460ee-031d-4fa2-8122-5455e3508622" id="sec.16A" provision.type="other" spent.amends="0"><no>16A</no><heading guid="_9358334e-5489-4df0-97c5-716fa4b28c04" id="sec.16A-he">What is a <defterm guid="_d01f10a8-890f-4ad7-a450-5f36db7ed7f9" id="sec.16A-def.distributionpipeline" type="mention">distribution pipeline</defterm></heading><subclause affected.by.uncommenced="0" guid="_aaa580da-bcfd-4892-b06d-2c70877b9aaf" id="sec.16A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A <b><defterm guid="_5eeebdc9-3f91-44bc-abda-61057e5b116d" id="sec.16A-def.distributionpipeline-oc.2" type="definition">distribution pipeline</defterm></b> is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6dae7d56-c65a-4608-9bb6-c6e4dbd09f43" id="sec.16A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a pipeline that transports fuel gas as part of a reticulation system; or</txt></block></li><li guid="_a7bfe0b2-79f6-4caf-81f2-f007fde843be" id="sec.16A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a pipeline that is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b2a5e79b-e46a-49c7-8642-e7eeb3328b8f" id="sec.16A-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a single point-to-point pipeline that transports fuel gas to a place other than a major user facility; or</txt></block></li><li guid="_5d2b9cd3-6002-4449-a5e2-ae3a188b8c9d" id="sec.16A-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a single point-to-point pipeline that transports fuel gas to a pipeline mentioned in <intref check="valid" refid="sec.16A-ssec.1-para1.b-para2.i" target.guid="_b2a5e79b-e46a-49c7-8642-e7eeb3328b8f">subparagraph (i)</intref>.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b021edee-67d8-459d-9e56-505b147a9097" id="sec.16A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, a pipeline is not a <defterm guid="_5e63d1cc-2a5a-42b1-84cb-7bd8dd4f7307" id="sec.16A-def.distributionpipeline-oc.3" type="definition">distribution pipeline</defterm> if it transports fuel gas to a pipeline mentioned in <intref check="valid" refid="sec.16A-ssec.1" target.guid="_aaa580da-bcfd-4892-b06d-2c70877b9aaf">subsection (1)</intref><intref check="valid" refid="sec.16A-ssec.1-para1.a" target.guid="_6dae7d56-c65a-4608-9bb6-c6e4dbd09f43">(a)</intref> or <intref check="valid" refid="sec.16A-ssec.1-para1.b" target.guid="_a7bfe0b2-79f6-4caf-81f2-f007fde843be">(b)</intref><intref check="valid" refid="sec.16A-ssec.1-para1.b-para2.ii" target.guid="_5d2b9cd3-6002-4449-a5e2-ae3a188b8c9d">(ii)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_71a2a1d1-8113-41a6-8eeb-836b5e3ec89d" id="sec.16A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_2aac513b-dcb6-46f0-8720-494fbbdafbc5" id="sec.16A-ssec.3-def.majoruserfacility_"><txt break.before="1"><defterm guid="_83cef556-8bb4-48e2-b7fa-e796c0943702" id="sec.16A-ssec.3-def.majoruserfacility" type="definition">major user facility</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_143adac8-12a7-45f8-9d95-a2b8386afb1d" id="sec.16A-ssec.3-def.majoruserfacility-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a facility within the area of a resource authority; or</txt></block></li><li guid="_21539ea9-9fce-45ce-96d8-80f7fc93b32c" id="sec.16A-ssec.3-def.majoruserfacility-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a facility that produces non-organic fertiliser; or</txt></block></li><li guid="_bbcd475a-4aba-477c-9119-073ca88ba11d" id="sec.16A-ssec.3-def.majoruserfacility-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a petroleum facility; or</txt></block></li><li guid="_e4f48060-00d4-44c1-bf8e-64a0bf40b309" id="sec.16A-ssec.3-def.majoruserfacility-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a power station; or</txt></block></li><li guid="_0e58dbab-2f62-4624-8636-94ee834c9d4d" id="sec.16A-ssec.3-def.majoruserfacility-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">a smelter.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_aead5657-2a4f-4c3d-9084-164561c452eb" id="sec.16A-ssec.3-def.pointtopointpipeline_"><txt break.before="1"><defterm guid="_e7220f81-6a52-4041-83fc-4114bc561efb" id="sec.16A-ssec.3-def.pointtopointpipeline" type="definition">point-to-point pipeline</defterm> means a pipeline from a particular point or points to another particular point or points.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_cbd5c9f4-7113-4f11-812f-5f00726c8404" id="sec.17" provision.type="other" spent.amends="0"><no>17</no><heading guid="_4f709bae-ef7b-4b7a-837f-d39954e4f279" id="sec.17-he">What is a <defterm guid="_47a95adf-ec07-42ec-9216-55ffdaa128f4" type="mention">petroleum facility</defterm></heading><block><txt break.before="0">A <defterm guid="_7f583ded-3f80-438c-bc7e-f770d4ca0101" id="def.petroleumfacility" type="definition">petroleum facility</defterm> is a facility for the distillation, processing, refining, storage or transport of petroleum, other than a distribution pipeline.</txt><note guid="_391e4efc-aec5-475d-925c-1dd47e19ef5e" id="sec.17-note" type="example"><heading guid="_ac2b22ec-0c11-4f5a-bd84-eee6aef09b14" id="sec.17-note-he">Examples of things that may be a petroleum facility—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_7c071103-4d7f-4e6e-bc21-f8dc5f892fa7" id="sec.17-note-para1" provision.type="other"><no>•</no><block><txt break.before="0">a storage depot</txt></block></li><li guid="_8b49fe97-638d-483c-b2cb-d123536c5a2c" id="sec.17-note-para1-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">a meter station</txt></block></li><li guid="_efacfaf1-7733-4e39-8614-850703e98a83" id="sec.17-note-para1-oc.3" provision.type="other"><no>•</no><block><txt break.before="0">a petroleum processing plant</txt></block></li><li guid="_1092d59d-21ec-4726-8087-65bea25df5fc" id="sec.17-note-para1-oc.4" provision.type="other"><no>•</no><block><txt break.before="0">an oil refinery</txt></block></li><li guid="_f1c68060-23af-41bd-aa55-5a6b2fe896e2" id="sec.17-note-para1-oc.5" provision.type="other"><no>•</no><block><txt break.before="0">an LPG separation plant</txt></block></li></list></block></note></block></clause><clause affected.by.uncommenced="0" guid="_00606342-13a2-49f5-a337-6c1f809e1f2e" id="sec.18" provision.type="other" spent.amends="0"><no>18</no><heading guid="_227c3de9-df67-4a5c-b0bf-d1a4420815a2" id="sec.18-he">Types of authority under Act</heading><subclause affected.by.uncommenced="0" guid="_b50a8cff-43ef-47e2-9531-603839cf5b0c" id="sec.18-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The following are the types of authority under this Act—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_be852b29-d8eb-4eeb-adf1-0333cc4a7650" id="sec.18-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an <defterm guid="_c1149d81-2a27-4d58-a75f-ba95c8058401" id="sec.18-ssec.1-def.authoritytoprospect" type="definition">authority to prospect</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b90ce0ab-93ca-4435-a04b-cd5cc392b6a2" id="sec.18-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">granted under <intref check="valid" refid="sec.41" target.guid="_46d6e431-6e86-4354-8d2b-e78c5135ad0d">section 41</intref>; or</txt></block></li><li guid="_11113ac1-254c-43e8-a47a-59c434c056cf" id="sec.18-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">continued in force under <intref check="valid" refid="sec.83" target.guid="_02ef8ff2-7f1b-4587-8d95-b927297c592e">section 83</intref> or <intref check="valid" refid="sec.119" target.guid="_be057a05-7430-4fa3-a7d6-81bf05cb24f4">119</intref>; or</txt></block></li><li guid="_d436e731-0d39-4b6f-84fb-4c27190069d7" id="sec.18-ssec.1-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">renewed under <intref check="valid" refid="sec.84" target.guid="_d8cacd4e-85d8-4a5a-9dd1-2c3fb6665cad">section 84</intref>;</txt></block></li></list></block></li><li guid="_d5a29c42-14ec-4d5a-b77f-952f35c9ca43" id="sec.18-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a <defterm guid="_50dda428-0e11-44da-9a69-96d013572e3a" id="sec.18-ssec.1-def.petroleumlease" type="definition">petroleum lease</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7b73b26d-da21-4bc8-8f7a-904be0b71fab" id="sec.18-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">granted under <intref check="valid" refid="sec.120" target.guid="_ca27be89-b993-4627-be10-da97814de1d8">section 120</intref>, <intref check="valid" refid="sec.132" target.guid="_285753db-9636-4c6a-b5d2-2bed5c49c521">132</intref>, <intref check="valid" refid="sec.340" target.guid="_9b3d744f-90d5-4e0b-8afe-68123f993116">340</intref> or <intref check="valid" refid="sec.356" target.guid="_962214dc-f85b-4056-b6ea-fb971d628929">356</intref> or <intref check="valid" refid="ch.15" target.guid="_5715b228-7bee-4f64-9a68-deae34090b8e">chapter 15</intref>; or</txt></block></li><li guid="_753f7eca-097b-44bb-8f3d-81340b63c513" id="sec.18-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">continued in force under <intref check="valid" refid="sec.163" target.guid="_0f91626a-41b6-452d-a3dc-cde0f7c8d05b">section 163</intref>; or</txt></block></li><li guid="_06c272e5-7f03-44f2-91bb-fa6d93da54dd" id="sec.18-ssec.1-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">renewed under <intref check="valid" refid="sec.164" target.guid="_cc0041d4-9257-4041-b504-057ce533e35e">section 164</intref>;</txt></block></li></list></block></li><li guid="_128e1318-332d-471c-a82a-5d3280f6bddf" id="sec.18-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a <defterm guid="_8ad26792-e520-4f73-bc9e-e7692a08b39a" id="sec.18-ssec.1-def.dataacquisitionauthority" type="definition">data acquisition authority</defterm>, granted under <intref check="valid" refid="sec.178" target.guid="_f6f66d5f-9502-4507-abd7-dd1cc7718650">section 178</intref>;</txt></block></li><li guid="_9f4f3b7e-746e-4c4c-b2a4-bc33f2c6e669" id="sec.18-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a <defterm guid="_c423ffcf-2bc6-451f-8043-059ded57dcac" id="sec.18-ssec.1-def.watermonitoringauthority" type="definition">water monitoring authority</defterm> granted under <intref check="valid" refid="sec.192" target.guid="_ff1770bb-f52c-46e5-b747-e13897efe9ed">section 192</intref>;</txt></block></li><li guid="_1848eaca-8965-4f2e-b3b2-4159843598a1" id="sec.18-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">a <defterm guid="_1ca56487-2165-44d5-8407-52887c887009" id="sec.18-ssec.1-def.surveylicence" type="definition">survey licence </defterm>granted under <intref check="valid" refid="sec.396" target.guid="_a696ea5f-b54e-40b8-b44a-e3e9087dfbc8">section 396</intref>;</txt></block></li><li guid="_5b1a11d7-6b69-43a9-9ec0-a0cf4cd0d4d4" id="sec.18-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">a <defterm guid="_537ddb1e-a8f1-4fae-b0da-01018102b427" id="sec.18-ssec.1-def.pipelinelicence" type="definition">pipeline licence</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a9bc302a-23bb-4a49-828b-2dad3ef67e92" id="sec.18-ssec.1-para1.f-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">granted under <intref check="valid" refid="sec.410" target.guid="_0c4d0b54-5164-4da0-ad81-1b542deba6b9">section 410</intref>; or</txt></block></li><li guid="_196888a1-c64d-48ae-bbaf-e99377140070" id="sec.18-ssec.1-para1.f-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">continued in force under <intref check="valid" refid="sec.481" target.guid="_8fbc44b0-e8a5-46d2-8865-7bafe520b746">section 481</intref>; or</txt></block></li><li guid="_e68228e5-f92d-4e1f-b394-5893d5b7d739" id="sec.18-ssec.1-para1.f-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">renewed under <intref check="valid" refid="sec.482" target.guid="_c2f2d334-9dd7-4d81-aeb7-f96a51185cae">section 482</intref>;</txt></block></li></list></block></li><li guid="_104ff9fe-c6b1-4c3d-8a69-5ab0c8741754" id="sec.18-ssec.1-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">a <defterm guid="_752f7a4a-d4e9-4ba7-9901-fe0beae3e7a1" id="sec.18-ssec.1-def.petroleumfacilitylicence" type="definition">petroleum facility licence</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b2ad7af2-d9b9-48f8-85f7-5a9e6cc9d2b8" id="sec.18-ssec.1-para1.g-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">granted under <intref check="valid" refid="sec.446" target.guid="_88b1869b-0b76-4e0b-aaee-6b2a067b73e2">section 446</intref>; or</txt></block></li><li guid="_debc256e-dfae-4a7f-8f3b-0ecd0c557a4b" id="sec.18-ssec.1-para1.g-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">continued in force under <intref check="valid" refid="sec.481" target.guid="_8fbc44b0-e8a5-46d2-8865-7bafe520b746">section 481</intref>; or</txt></block></li><li guid="_939895aa-c638-4eaa-850b-ca66a07a9620" id="sec.18-ssec.1-para1.g-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">renewed under <intref check="valid" refid="sec.482" target.guid="_c2f2d334-9dd7-4d81-aeb7-f96a51185cae">section 482</intref>;</txt></block></li></list></block></li><li guid="_aea95781-bf10-45c4-bf1a-0f0456f71df1" id="sec.18-ssec.1-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">a <defterm guid="_8400dd06-fe60-4356-a642-7ba591677fdf" id="sec.18-ssec.1-def.gasworklicence" type="definition">gas work licence</defterm> granted under <intref check="valid" refid="ch.9" target.guid="_e115e3d8-9707-4c5d-b3e6-be71f8d522ee">chapter 9</intref>, <intref check="valid" refid="ch.9-pt.6" target.guid="_d6052195-5e83-4b3d-b73c-2e57547f2071">part 6</intref>, <intref check="valid" refid="ch.9-pt.6-div.3" target.guid="_2bf72288-2915-4eb2-8b1c-7c5765215301">division 3</intref>, <intref check="valid" refid="ch.9-pt.6-div.3-sdiv.1" target.guid="_0e34a231-9923-442c-96b2-99248be81474">subdivision 1</intref>;</txt></block></li><li guid="_1fb2f16b-99e9-46cb-989a-9cced3e5edfa" id="sec.18-ssec.1-para1.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a <defterm guid="_99a3d3fc-5114-4fdc-93e1-55b318bd5ae1" id="sec.18-ssec.1-def.gasworkauthorisation" type="definition">gas work authorisation</defterm> granted under <intref check="valid" refid="ch.9" target.guid="_e115e3d8-9707-4c5d-b3e6-be71f8d522ee">chapter 9</intref>, <intref check="valid" refid="ch.9-pt.6" target.guid="_d6052195-5e83-4b3d-b73c-2e57547f2071">part 6</intref>, <intref check="valid" refid="ch.9-pt.6-div.3" target.guid="_2bf72288-2915-4eb2-8b1c-7c5765215301">division 3</intref>, <intref check="valid" refid="ch.9-pt.6-div.3-sdiv.1" target.guid="_0e34a231-9923-442c-96b2-99248be81474">subdivision 1</intref><del xml:space="preserve">.</del><ins xml:space="preserve">;</ins></txt></block></li><li change="ins" guid="_f5cda243-c457-4f5a-a763-4a04eb5312bd" id="sec.18-ssec.1-para1.j" provision.type="other"><no>(j)</no><block><txt break.before="0">a <defterm guid="_3f168251-9076-42f3-af65-567b007db2bc" id="sec.18-ssec.1-def.gasdeviceapprovalauthority" type="definition">gas device approval authority</defterm> granted under chapter 9, part 6A, division 2.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3adfe92d-b344-428c-a5b7-9599d1993a99" id="sec.18-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The authorities, other than a gas work licence<ins xml:space="preserve">, gas work authorisation</ins> or <del xml:space="preserve">authorisation</del><ins xml:space="preserve">gas device approval authority</ins>, are collectively referred to as a <defterm guid="_75067326-bdd4-410c-9b09-d13e3ad7a662" id="sec.18-def.petroleumauthority" type="definition">petroleum authority</defterm>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3b8d89c3-407b-4e6a-b812-bafef26247b1" id="sec.18-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Authorities to prospect and petroleum leases are collectively referred to as a <defterm guid="_4ecc8fdb-73a5-479c-94ae-82ebff7ce6ea" id="sec.18-def.petroleumtenure" type="definition">petroleum tenure</defterm>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_47d39f98-85b0-48d1-ad3f-5c6ddf30c94a" id="sec.18-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Survey licences, pipeline licences and petroleum facility licences are collectively referred to as a <defterm guid="_055e6503-8015-44c7-ac4a-7347fb041941" id="sec.18-def.licence" type="definition">licence</defterm>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_6a5ab8f1-7066-40fa-a529-faf109917dea" id="sec.19" provision.type="other" spent.amends="0"><no>19</no><heading guid="_3aa953e4-47d9-42cc-810b-a579be4184be" id="sec.19-he">Who is an <defterm guid="_d8257182-7b50-489e-aebc-f2486a655e3b" type="mention">eligible person</defterm></heading><block><txt break.before="1">An <defterm guid="_4e50abe9-fa5f-437d-995e-388cb225538c" id="def.eligibleperson" type="definition">eligible person</defterm> is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0053d5dd-a64b-43b8-8318-bb343d69309d" id="sec.19-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an adult; or</txt></block></li><li guid="_a1d71898-896d-44a5-91ac-d43aff28df9f" id="sec.19-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a company or a registered body under the <legref check="invalid" jurisd="CTH" type="act"><name emphasis="no">Corporations Act</name></legref>; or</txt></block></li><li guid="_d9cc5aa8-d8bd-4eb1-a703-b2cf93e437db" id="sec.19-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a government owned corporation.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_746e989f-44f2-4d9b-9550-13495b74b131" id="sec.20" provision.type="other" spent.amends="0"><no>20</no><heading guid="_0d3236d6-8f62-497c-9b20-1984d6460be6" id="sec.20-he">What are the <defterm guid="_6a23c344-c991-4cf4-911d-92f6ce569940" type="mention">conditions</defterm> of a petroleum authority</heading><subclause affected.by.uncommenced="0" guid="_1d4b3d2d-f14e-4eca-8a48-897ae16aeecd" id="sec.20-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The <defterm guid="_9a946b69-035a-4eea-b670-61efd9a13600" id="sec.20-def.conditions-oc.2" type="definition">conditions</defterm> of a petroleum authority are—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a72b3b1a-93c0-4a3b-afce-358c66172233" id="sec.20-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the conditions stated in it from time to time; and</txt></block></li><li guid="_f6c708bb-c615-44a5-8927-d6f4631d4775" id="sec.20-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the authority holder’s obligations under chapters 2 to 5; and</txt></block></li><li guid="_217c213b-3bff-4c9c-b674-fa0f7e2c6013" id="sec.20-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">any condition of the authority under chapters 2 to 5; and</txt></block></li><li guid="_d4053740-c0e7-43a7-9080-d4ab3962a92d" id="sec.20-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a condition that an authority holder must ensure each person acting for the holder who carries out an authorised activity for the authority complies with its conditions to the extent they apply to the carrying out of the activity.</txt><note guid="_887784ab-0c61-4e43-99e2-f68bf08283e8" id="sec.20-ssec.1-para1.d-note" type="example"><heading guid="_b2a32804-c042-41e2-b685-b7809f9dd3a3" id="sec.20-ssec.1-para1.d-note-he">Note—</heading><block><txt break.before="1">For who may carry out an authorised activity for the holder, see <intref check="valid" refid="sec.563" target.guid="_67d472c3-9467-468b-8bb0-c21101321b5e">section 563</intref>.</txt></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6716699a-7cd3-4f35-945e-49a35a3ccdd3" id="sec.20-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A condition mentioned in <intref check="valid" refid="sec.20-ssec.1" target.guid="_1d4b3d2d-f14e-4eca-8a48-897ae16aeecd">subsection (1)</intref><intref check="valid" refid="sec.20-ssec.1-para1.b" target.guid="_f6c708bb-c615-44a5-8927-d6f4631d4775">(b)</intref> or <intref check="valid" refid="sec.20-ssec.1-para1.c" target.guid="_217c213b-3bff-4c9c-b674-fa0f7e2c6013">(c)</intref> is a <defterm guid="_98a6b6e1-a228-40eb-aadb-d4a09084b7a5" id="sec.20-def.mandatorycondition" type="definition">mandatory condition</defterm> of the authority.</txt><note guid="_4a14dd47-250d-4c3c-882e-79f421631853" id="sec.20-ssec.2-note" type="example"><heading guid="_e08b72b3-b0e7-426f-a7c4-aec2b4abccca" id="sec.20-ssec.2-note-he">Note—</heading><block><txt break.before="1">If a Coordinator-General’s condition applies to a petroleum lease, pipeline licence or petroleum facility licence, or proposed petroleum lease, pipeline licence or petroleum facility licence, for a coordinated project, and the condition conflicts with a mandatory condition for that type of petroleum authority, the Coordinator-General’s condition prevails to the extent of the inconsistency. See <intref check="valid" refid="sec.123A" target.guid="_e11b7e6e-60f4-4d1f-bb32-466583b6d972">sections 123A</intref>, <intref check="valid" refid="sec.412A" target.guid="_5237f0a2-dee2-44a2-9f3d-9058b798ccb3">412A</intref> and <intref check="valid" refid="sec.447A" target.guid="_ab5c76cf-5329-49aa-8c2b-aca1f01523f9">447A</intref>.</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_5a6221e3-ad92-492e-b1a0-6e6270828910" id="sec.21" provision.type="other" spent.amends="0"><no>21</no><heading guid="_20152dbf-e679-4475-a989-3d96900360c6" id="sec.21-he">What are the <defterm guid="_43cc8c5e-c66b-41ce-a0ba-a52441444262" type="mention">provisions</defterm> of a petroleum authority</heading><subclause affected.by.uncommenced="0" guid="_386866f1-34ad-443a-a419-06ec6c1b86d9" id="sec.21-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A reference in this Act to an authority under this Act includes a reference to its provisions.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_475478ef-03ff-4320-b2a3-28635ef187b6" id="sec.21-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A reference in this Act to the provisions of the authority is a reference to its mandatory or other conditions and any thing written in it.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_807fe87c-8af4-4b03-bb5d-d074825623a9" id="sec.22" provision.type="other" spent.amends="0"><no>22</no><heading guid="_f4ed491b-aba9-406b-8306-67a7fcad3130" id="sec.22-he">What is an <defterm guid="_3d83b7d1-f7f3-4912-b42e-1f2de489215c" type="mention">authorised activity</defterm></heading><subclause affected.by.uncommenced="0" guid="_4a0d3d0c-2760-4f90-a5df-0492ad009194" id="sec.22-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An <defterm guid="_4f01f212-c024-41c7-9591-a42814644288" id="sec.22-def.authorisedactivity-oc.2" type="definition">authorised activity</defterm>, for a petroleum authority, is an activity that its holder is, under this Act or the authority, entitled to carry out in relation to the authority.</txt><note guid="_a940e6b8-7b25-4753-8e61-05195a782316" id="sec.22-ssec.1-note" type="example"><heading guid="_febf3b9c-71c2-49d4-a9d7-b686c97619dd" id="sec.22-ssec.1-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_34ea6cab-280e-441c-98c0-a73ab2f4014c" id="sec.22-ssec.1-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">The provisions of the authority may restrict the carrying out of authorised activities. See <intref check="valid" refid="sec.42" target.guid="_37ce7fc5-36f4-4382-9a31-d9859bb50de9">sections 42</intref>, <intref check="valid" refid="sec.85" target.guid="_023f553a-88c4-406b-83f3-4f1e559fb059">85</intref>, <intref check="valid" refid="sec.123" target.guid="_ef44ece4-3399-4e95-8180-52c9dbb8d1b6">123</intref>, <intref check="valid" refid="sec.165" target.guid="_7c86a678-edd7-4445-8027-62b4d3226729">165</intref>, <intref check="valid" refid="sec.178" target.guid="_f6f66d5f-9502-4507-abd7-dd1cc7718650">178</intref>, <intref check="valid" refid="sec.396" target.guid="_a696ea5f-b54e-40b8-b44a-e3e9087dfbc8">396</intref>, <intref check="valid" refid="sec.412" target.guid="_4254ee96-45e5-4851-882e-f6dbec58a009">412</intref>, <intref check="valid" refid="sec.447" target.guid="_8b75747b-1e26-4e2a-96f5-f1c3fd918b78">447</intref>, <intref check="valid" refid="sec.484" target.guid="_cb4c64df-2e7d-4939-be5b-d1e90d17414d">484</intref> and <intref check="valid" refid="sec.790" target.guid="_0ae40873-0f6d-4440-a74c-a02fa5649d4f">790</intref><intref check="valid" refid="sec.790-ssec.3" target.guid="_630ac6b8-5273-4050-a8a9-2037f532c5d3">(3)</intref>.</txt></block></li><li guid="_5c45f0a1-b28d-46a4-9c6f-29e02e494d0f" id="sec.22-ssec.1-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">The carrying out of authorised activities is subject to the restrictions and the authority holder’s rights and obligations under chapters 2 to 5. See <intref check="valid" refid="sec.562" target.guid="_5f70dba0-9298-4b7d-be74-11caad21eb37">section 562</intref>.</txt></block></li><li guid="_583a702e-78ce-4624-940e-abda9f9ec642" id="sec.22-ssec.1-note-para1.3" provision.type="other"><no>3</no><block><txt break.before="0">The carrying out of particular activities on particular land in a petroleum authority’s area may not be authorised following the taking of the land under a resumption law. See <intref check="valid" refid="sec.30AB" target.guid="_4abe0a1b-ba8f-40b0-b76e-1e1864fb56ff">section 30AB</intref>.</txt></block></li><li guid="_1d38dbc9-1d3e-4638-89ef-b38b0939d1ee" id="sec.22-ssec.1-note-para1.4" provision.type="other"><no>4</no><block><txt break.before="0">For who may carry out an authorised activity for a petroleum authority holder, see <intref check="valid" refid="sec.563" target.guid="_67d472c3-9467-468b-8bb0-c21101321b5e">section 563</intref>.</txt></block></li></list></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_73d6afed-d88f-473c-80b1-49a327ec8820" id="sec.22-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An <defterm guid="_b3958bf1-32cc-48e4-a944-f88ab9418f54" id="sec.22-def.authorisedactivity-oc.3" type="definition">authorised activity</defterm>, for a coal or oil shale mining tenement, is an activity that its holder is, under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref> or the tenement, entitled to carry out or exercise in relation to the tenement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1a986704-ba1d-42ee-836c-5bcc1dd3d93e" id="sec.22-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">An <defterm guid="_999700ec-bca1-4e2b-9e37-1636c54d8cac" id="sec.22-def.authorisedactivity-oc.4" type="definition">authorised activity</defterm>, for a GHG authority, is an activity that its holder is, under the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref> or the authority, entitled to carry out or exercise in relation to the authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d82d52ef-7274-41c8-b25b-b88304a5f649" id="sec.22-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">An <defterm guid="_1d80fed0-eb91-497b-bcef-a4578aa239f7" id="sec.22-def.authorisedactivity-oc.5" type="definition">authorised activity</defterm>, for a geothermal tenure, is an activity that its holder is, under the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref> or the tenure, entitled to carry out or exercise in relation to the tenure.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8c50aae0-9d0c-4434-bd98-23d4f2aa22d3" id="sec.23" provision.type="other" spent.amends="0"><no>23</no><heading guid="_afe9ed55-4bb5-4af1-b33e-c5b80eca241c" id="sec.23-he">What is a <defterm guid="_456dfa77-7cb4-4cac-8d5c-f1e325d1a493" type="mention">work program</defterm> for an authority to prospect</heading><subclause affected.by.uncommenced="0" guid="_6ef6f9f2-6a53-44c2-aabc-2d65ac1bd67b" id="sec.23-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The <defterm guid="_62131d01-6598-4985-b8cf-71480792e999" id="sec.23-def.workprogram-oc.2" type="definition">work program</defterm> for an authority to prospect is its current initial or later work program approved under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.1" target.guid="_ae224c28-0e3b-4475-a663-d926bb3b8358">part 1</intref>, <intref check="valid" refid="ch.2-pt.1-div.3" target.guid="_68a7a1d9-c152-465c-9d27-7eebd1ad4060">division 3</intref>, as amended from time to time under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.1" target.guid="_ae224c28-0e3b-4475-a663-d926bb3b8358">part 1</intref>, <intref check="valid" refid="ch.2-pt.1-div.3" target.guid="_68a7a1d9-c152-465c-9d27-7eebd1ad4060">division 3</intref>, <intref check="valid" refid="ch.2-pt.1-div.3-sdiv.6" target.guid="_32b497cb-19b1-442c-975a-0c9ddae56156">subdivision 6</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1687b3c1-9aed-437b-9666-fb89668c9cc0" id="sec.23-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.23-ssec.1" target.guid="_6ef6f9f2-6a53-44c2-aabc-2d65ac1bd67b">subsection (1)</intref>, the work program is current if the period to which the program applies has started and not ended.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_85995781-9df6-4f8f-a0c8-0e7772a28e9f" id="sec.24" provision.type="other" spent.amends="0"><no>24</no><heading guid="_283e9405-c4af-4423-81b1-2fe0aedf95cd" id="sec.24-he">What is a <defterm guid="_66cc5b87-6fdb-4941-84a5-e7265acda37f" type="mention">development plan</defterm> for a petroleum lease</heading><subclause affected.by.uncommenced="0" guid="_ae989c1b-8d22-44b9-b3c3-fff4a6e6174c" id="sec.24-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The <defterm guid="_5a71a182-c0bc-425c-92d7-cbfe150db1f9" id="sec.24-def.developmentplan-oc.2" type="definition">development plan</defterm> for a petroleum lease is its current initial or later development plan approved under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.2" target.guid="_f0429453-3af6-43cd-a6dd-cfc8b78be0a9">part 2</intref>, <intref check="valid" refid="ch.2-pt.2-div.4" target.guid="_20042571-c618-44c9-9361-f8620ebcf824">division 4</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8cebdd83-77a8-40f3-9222-ea24460348f6" id="sec.24-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.24-ssec.1" target.guid="_ae989c1b-8d22-44b9-b3c3-fff4a6e6174c">subsection (1)</intref>, the development plan is current if the period to which the plan applies has started and has not ended.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_ebe75f97-a106-413c-8151-43b13345ca1c" id="ch.1-pt.4"><no>Part 4</no><heading guid="_94d5a909-b624-44a5-8754-cfcb38a581d9" id="ch.1-pt.4-he">Property in petroleum</heading><clause affected.by.uncommenced="0" guid="_bd4941a4-05b3-4308-8d5b-a56b88ad90a1" id="sec.26" provision.type="other" spent.amends="0"><no>26</no><heading guid="_8d35bbc2-e074-412c-aca2-0167a53626bf" id="sec.26-he">Petroleum the property of the State</heading><subclause affected.by.uncommenced="0" guid="_4ab9934a-043c-4ab2-9dc0-9d6484e2340b" id="sec.26-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section is subject to <intref check="valid" refid="sec.28" target.guid="_bb2a38cc-53d1-46c8-96a0-e3eed9e298a9">section 28</intref> and <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.6" target.guid="_55412cd7-ecff-4e2b-99fa-1c2290aac632">part 6</intref>, <intref check="valid" refid="ch.2-pt.6-div.3" target.guid="_fdcb9028-dc52-4ad5-9359-62ed5afd2f91">division 3</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_20711011-265a-4340-b684-00f02bc5a8c2" id="sec.26-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">All petroleum as follows is, and always has been, the property of the State—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4f8ee513-08dd-49cc-b609-475634d205a2" id="sec.26-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">petroleum on the surface of land, if it was produced in the State;</txt></block></li><li guid="_07cdf9e0-bd28-4da8-9070-3ca46c242d6e" id="sec.26-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">petroleum in a natural underground reservoir in the State, other than petroleum in the reservoir produced outside the State and injected or reinjected into the reservoir.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5582435d-aa4e-4e90-8e44-680281cf7570" id="sec.26-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">To remove any doubt, it is declared that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_862e582f-9a86-40a0-b0b9-5e222f2cbd11" id="sec.26-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a person does not acquire any property in petroleum merely because the person discovers petroleum in a natural underground reservoir; and</txt></block></li><li guid="_011644e5-3d47-4b82-924d-2d09e6ddd0a3" id="sec.26-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0"><intref check="valid" refid="sec.26-ssec.2" target.guid="_20711011-265a-4340-b684-00f02bc5a8c2">subsection (2)</intref><intref check="valid" refid="sec.26-ssec.2-para1.a" target.guid="_4f8ee513-08dd-49cc-b609-475634d205a2">(a)</intref> applies whether or not the land is freehold or other land; and</txt></block></li><li guid="_ecc17c31-52f9-41d1-a335-4e569496298a" id="sec.26-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0"><intref check="valid" refid="sec.26-ssec.2" target.guid="_20711011-265a-4340-b684-00f02bc5a8c2">subsection (2)</intref><intref check="valid" refid="sec.26-ssec.2-para1.b" target.guid="_07cdf9e0-bd28-4da8-9070-3ca46c242d6e">(b)</intref> applies whether or not the natural underground reservoir is in or under freehold or other land.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_db62f4e4-c9d9-4e96-863f-1ff86129054a" id="sec.26-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">This section applies despite any other Act, grant, title or other document in force from the commencement of this section.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_914adad5-2e29-4a30-9f01-b5a2dc028abd" id="sec.26-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_1b5eeaa5-ad7f-4589-badb-243fda3a74bc" id="sec.26-ssec.5-def.theState_"><txt break.before="1"><defterm guid="_7c299be4-2abc-4b20-8e66-808c9e88eb65" id="sec.26-ssec.5-def.theState" type="definition">the State</defterm> does not include any of the adjacent area under the <legref check="valid" jurisd="QLD" target.doc.id="act-1982-022" target.version.series="2d2296dc-4b3d-4b9d-b087-19dba1900a67" type="act"><name emphasis="yes">Petroleum (Submerged Lands) Act 1982</name></legref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7122bc4f-9fdb-42a4-9646-591c76e100dd" id="sec.27" provision.type="other" spent.amends="0"><no>27</no><heading guid="_f1578c3e-91eb-40f2-8100-e3efd9e5457c" id="sec.27-he">Petroleum reservation in land grants</heading><subclause affected.by.uncommenced="0" guid="_3df810e8-6d6e-4adc-8d50-ec15a8751c68" id="sec.27-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to each grant under another Act, other than the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>, of a right—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a0b38eac-eb08-44db-a0d9-c55336e4beac" id="sec.27-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">relating to land that, immediately before the grant, was unallocated State land as defined under the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-081" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act"><name emphasis="yes">Land Act 1994</name></legref>; and</txt></block></li><li guid="_2259b1b2-a342-46c7-af70-69152cf7be97" id="sec.27-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that is, or was, issued on or after the commencement of the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>.</txt><note guid="_0bb67698-bcb2-4751-8f4f-15baa991ffac" id="sec.27-ssec.1-para1.b-note" type="example"><heading guid="_4c851699-962e-4d31-8e1c-808024fda25a" id="sec.27-ssec.1-para1.b-note-he">Note—</heading><block><txt break.before="1">The <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> commenced on 12 November 1923.</txt></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1f1065d3-21a4-4a2f-b22a-a247506dec32" id="sec.27-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The grant is taken to contain a reservation to the State of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1c9ddbd6-bd2e-416e-88d7-ea07815e8b2d" id="sec.27-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">all petroleum on or below the surface of the land; and</txt></block></li><li guid="_73a53031-c88a-40fc-8ec5-db5d9ca2081e" id="sec.27-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the exclusive right to do the following in relation to the land—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bd20b8f2-3a6c-4d8a-9292-dfc9ac4846a0" id="sec.27-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">to enter and carry out any petroleum-related activity;</txt></block></li><li guid="_35d53e67-51e0-41ca-920a-66dacab53c68" id="sec.27-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">to authorise, under the provisions of this Act or another Act, others to carry out any petroleum-related activity;</txt></block></li><li guid="_7ab71afd-e0b0-4c08-9ef5-8b268b16131e" id="sec.27-ssec.2-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">to regulate, under the provisions of this Act or another Act, petroleum-related activities carried out by others.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2c953e93-6e34-41f3-bed6-9d081b77292b" id="sec.27-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_9890435e-cfa8-49a9-9871-b243b2df5ab8" id="sec.27-ssec.3-def.grant_"><txt break.before="1"><defterm guid="_2394a869-3da1-4b65-8891-747aa52d981f" id="sec.27-ssec.3-def.grant" type="definition">grant</defterm>, of a right, includes an authority, lease, licence, permit or other instrument of tenure, however called.</txt></definition><definition affected.by.uncommenced="0" guid="_37a1287c-1062-4a54-8067-fb11e4ab4782" id="sec.27-ssec.3-def.petroleumrelatedactivity_"><txt break.before="1"><defterm guid="_b3edcdbe-f5a6-4307-a40e-97e5ca75266a" id="sec.27-ssec.3-def.petroleumrelatedactivity" type="definition">petroleum-related activity</defterm> means any activity that may be carried out under this Act by the holder of any petroleum authority.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_bb2a38cc-53d1-46c8-96a0-e3eed9e298a9" id="sec.28" provision.type="other" spent.amends="0"><no>28</no><heading guid="_7effbdb9-4893-4c8f-849e-c5ffb87905bf" id="sec.28-he">Property in petroleum produced</heading><subclause affected.by.uncommenced="0" guid="_6e409043-8e2c-4aee-810e-fcc16eb412da" id="sec.28-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a person produces petroleum, it becomes the person’s property—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_85c81be5-b6e6-402b-a9b6-ec4b8b3146d2" id="sec.28-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the petroleum is produced under this Act; or</txt></block></li><li guid="_d4ceed49-673b-49a0-abd4-3dfda8169d69" id="sec.28-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for coal seam gas—if it is mined under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.318CM" target.doc.id="act-1989-110" target.guid="_c4cd0783-ee07-423e-9341-195a04b0637e" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 318CM</legref> or <legref check="valid" jurisd="QLD" refid="sec.747" target.doc.id="act-1989-110" target.guid="_f572705e-5e01-432d-a3f6-1d54ce40bc6f" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">747</legref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d5b6266d-50df-4f0f-b200-a6d0f9575700" id="sec.28-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.28-ssec.1" target.guid="_6e409043-8e2c-4aee-810e-fcc16eb412da">subsection (1)</intref> is subject to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2f483f0b-312e-4c0f-8916-044a6573f791" id="sec.28-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">any coordination arrangement or storage agreement to which the person is a party; and</txt></block></li><li guid="_3a32a810-73ad-4a23-a3be-0aea05c264fe" id="sec.28-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any order of the Land Court under <intref check="valid" refid="sec.116" target.guid="_7d294fd1-3744-4653-aa38-77bb2cb14090">section 116</intref>; and</txt></block></li><li guid="_41cebfa3-0e91-441a-97a5-5184aeff4411" id="sec.28-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0"><intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.6" target.guid="_55412cd7-ecff-4e2b-99fa-1c2290aac632">part 6</intref>, <intref check="valid" refid="ch.2-pt.6-div.3" target.guid="_fdcb9028-dc52-4ad5-9359-62ed5afd2f91">division 3</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f42efe65-cb0e-4a5a-8daf-41b93da7f741" id="sec.28-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0"><intref check="valid" refid="sec.28-ssec.1" target.guid="_6e409043-8e2c-4aee-810e-fcc16eb412da">Subsection (1)</intref> does not cease to apply merely because the petroleum is injected or reinjected into a natural underground reservoir.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_a876929b-b0da-462e-b973-a13c93269949" id="ch.1-pt.5"><no>Part 5</no><heading guid="_1740edad-3777-4148-8cc9-ffed2d95607b" id="ch.1-pt.5-he">General provisions for petroleum authorities</heading><clause affected.by.uncommenced="0" guid="_d20e002f-c415-4051-bfa8-5447f61eb769" id="sec.29" provision.type="other" spent.amends="0"><no>29</no><heading guid="_63c0166f-75c4-4025-b835-a699c5fc6075" id="sec.29-he">Graticulation of earth’s surface into <defterm guid="_735d83d1-df40-4d12-aed4-68423663fc49" type="mention">blocks</defterm> and <defterm guid="_07bffaa9-0017-454b-a6e6-9437e574e539" type="mention">sub-blocks</defterm></heading><subclause affected.by.uncommenced="0" guid="_c12e803f-e1bc-454e-a3a2-f4705e07a276" id="sec.29-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A <defterm guid="_20aede15-0921-40c5-8d68-26ba817c9a45" id="sec.29-def.block" type="definition">block</defterm> is the land resulting from a notional division of the earth’s surface—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c2d551ff-7740-496b-9ea3-1b1ed6831b35" id="sec.29-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">by 2 meridians of longitude 5 minutes apart, each meridian being a multiple of 5 minutes of longitude from the meridian of Greenwich; and</txt></block></li><li guid="_2d778fac-14ae-4faf-a054-8c6711dd8905" id="sec.29-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">by 2 parallels of latitude 5 minutes apart, each parallel being a multiple of 5 minutes of latitude from the equator.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d4348378-c3fd-4277-a90f-b864c1aeb1cb" id="sec.29-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A <defterm guid="_c0c57a06-2798-43d7-a1d5-2778a1dc5ce0" id="sec.29-def.subblock" type="definition">sub-block</defterm> is the land resulting from a notional division of a block into 25 areas, each sub-block being bounded by 2 meridians 1 minute of longitude apart and 2 parallels of latitude 1 minute of latitude apart.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4839864f-7e6e-43e9-8fad-db8453dddfc9" id="sec.29-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Each block and sub-block must be identified in the way approved by the chief executive.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_42c13a0d-968c-4ef5-bd71-f4114acbd7a2" id="sec.30" provision.type="other" spent.amends="0"><no>30</no><heading guid="_62386142-ad06-41be-bfeb-189ddbef8c68" id="sec.30-he">Petroleum authority does not create an interest in land</heading><block><txt break.before="1">The granting of a petroleum authority does not create an interest in any land.</txt></block></clause><clause affected.by.uncommenced="0" guid="_2bac35d6-219a-4bf4-9209-e7717cd0fd8f" id="sec.30AA" provision.type="other" spent.amends="0"><no>30AA</no><heading guid="_10119703-7a3b-4e44-9c5c-c9a18efb7b18" id="sec.30AA-he">Extinguishing petroleum interests on the taking of land in a petroleum authority’s area (other than by an easement)</heading><subclause affected.by.uncommenced="0" guid="_b4a06f01-2c0d-4573-ab71-c50b90dec637" id="sec.30AA-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the taking of land, other than by taking or otherwise creating an easement, under a resumption law.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_98d7c134-d88a-4f13-ab62-b7dd39f0da76" id="sec.30AA-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite any other Act, the taking of land does not extinguish petroleum interests other than to the extent, if any, provided for in the resumption notice for the taking of the land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c71fb8f1-eb9a-4c81-b4ce-7720d2534cd1" id="sec.30AA-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The resumption notice for the taking of land may provide for the extinguishment of a petroleum interest on the taking only to the extent the relevant Minister for the taking is satisfied the interest is incompatible with the purpose for which the land is taken.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bc1cf490-3193-4985-9894-2c56e1ada72d" id="sec.30AA-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Without limiting the application of <intref check="valid" refid="sec.30AA-ssec.3" target.guid="_c71fb8f1-eb9a-4c81-b4ce-7720d2534cd1">subsection (3)</intref>, the relevant Minister may be satisfied a petroleum interest is incompatible with the purpose for which the land is taken if, for that purpose, it is necessary to extinguish all interests in the land, including native title rights and interests.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_12f509af-56a5-4b31-a341-5b2d2683b879" id="sec.30AA-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">A petroleum interest may be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3a7daa28-7936-4577-9ed4-94f16d37c1f5" id="sec.30AA-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">wholly extinguished; or</txt></block></li><li guid="_cc5d017f-66a5-4f4e-a508-3067ab74724e" id="sec.30AA-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">partially extinguished by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bae260eb-d876-43e9-bbd5-e06ed7ac90d3" id="sec.30AA-ssec.5-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">excluding land from the land the subject of the interest; or</txt></block></li><li guid="_5b545757-b7ff-4f85-95d1-935a8049c600" id="sec.30AA-ssec.5-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">prohibiting the carrying out of activities by the holder of the interest.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_dee900ac-8e83-4ea8-96b4-e8af54e661c2" id="sec.30AA-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The resumption notice for the taking of land may provide for the extinguishment of petroleum interests by reference to either or both of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_33027918-1c17-42a6-a79a-705afef50d24" id="sec.30AA-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">stated land, which—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bd179cb1-ff6c-4288-b7fb-fd307a861d74" id="sec.30AA-ssec.6-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">may be all or part of the land that is taken; and</txt></block></li><li guid="_aeed66b5-5f45-43ba-803a-7cbd2307db5e" id="sec.30AA-ssec.6-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the stated land is only part of the land that is taken—may be described in the resumption notice in any way, including, for example—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_17684c90-b116-468e-a19d-93adebb59b94" id="sec.30AA-ssec.6-para1.a-para2.ii-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">as a shape that does not constitute a block or sub-block; or</txt></block></li><li guid="_b239d495-10f9-4ccc-8f40-a8788ff28546" id="sec.30AA-ssec.6-para1.a-para2.ii-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">by using 3 dimensionally located points to identify the position, shape and dimensions of each boundary;</txt></block></li></list></block></li></list></block></li><li guid="_b2528c9e-d53c-4b8d-b984-4817d8112bf0" id="sec.30AA-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">stated petroleum interests, which may be all petroleum interests or petroleum interests of a particular type.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_97b24da3-e177-466c-8e39-a177dcbc822f" id="sec.30AA-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">For the taking of land for which petroleum interests are extinguished as provided by this section—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f59c79a9-f771-4326-9eb3-fd653c0367ec" id="sec.30AA-ssec.7-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">each person’s interest in an extinguished petroleum interest is converted into a right to claim compensation under the resumption law; and</txt></block></li><li guid="_25fa4d81-7ff1-4317-8c01-537a7e922834" id="sec.30AA-ssec.7-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the resumption law applies with necessary and convenient changes and with the changes mentioned in <intref check="valid" refid="sec.30AA-ssec.8" target.guid="_61506254-3eee-407c-b9d2-9523894f02c1">subsections (8)</intref> and <intref check="valid" refid="sec.30AA-ssec.9" target.guid="_2666b6e5-e030-4e39-afc2-478ccd0d6193">(9)</intref> and <intref check="valid" refid="sec.30AD" target.guid="_024c18b9-b596-4308-8f29-01e8b20d4be1">section 30AD</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_61506254-3eee-407c-b9d2-9523894f02c1" id="sec.30AA-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">The notice of intention to resume for the proposed taking of the land must state the extent to which the petroleum interests are proposed to be extinguished.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2666b6e5-e030-4e39-afc2-478ccd0d6193" id="sec.30AA-ssec.9" provision.type="other"><no>(9)</no><block><txt break.before="0">The entity taking the land must give the chief executive a notice that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ad84d2de-5bfc-4d27-b1da-dc3879aecdaa" id="sec.30AA-ssec.9-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">states the details of the extinguishment; and</txt></block></li><li guid="_3ef6e46e-e5b6-480f-bd39-9f6ac67149f1" id="sec.30AA-ssec.9-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">asks for the extinguishment to be recorded in the register; and</txt></block></li><li guid="_89178652-0d09-4947-bc90-cfb285115e4d" id="sec.30AA-ssec.9-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">is accompanied by a certified copy of the resumption notice.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_98da41b3-ceeb-4b33-9e6c-7f86968a5718" id="sec.30AA-ssec.10" provision.type="other"><no>(10)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_1984ea5b-e453-45be-bd3e-e7a22e01393f" id="sec.30AA-ssec.10-def.certifiedcopy_"><txt break.before="1"><defterm guid="_47eae7f4-f87e-47ce-b5a4-daaa14653f8e" id="sec.30AA-ssec.10-def.certifiedcopy" type="definition">certified copy</defterm>, of the resumption notice, means a copy of the original of the notice that has been certified by a justice of the peace as being a correct copy of the original notice.</txt></definition><definition affected.by.uncommenced="0" guid="_cee5169f-729b-4655-9c09-9260cafa8c64" id="sec.30AA-ssec.10-def.relevantMinister_"><txt break.before="1"><defterm guid="_cdd15300-37c1-4f51-8d5b-dc8503c6c281" id="sec.30AA-ssec.10-def.relevantMinister" type="definition">relevant Minister</defterm>, for the taking of land under a resumption law, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_09f71f1c-9a0e-40f1-b4ba-8cd5cadb8517" id="sec.30AA-ssec.10-def.relevantMinister-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the land is taken under the process stated in the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="no">ALA</name></legref> (whether the land is taken under the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="no">ALA</name></legref> or another resumption law)—the Minister to whom the application that the land be taken is made under <legref check="invalid" jurisd="QLD" refid="sec.9" target.doc.id="act-2012-020" type="act">section 9</legref> of that Act; or</txt></block></li><li guid="_dc9fb2f8-2d93-4d78-af44-03c691d91491" id="sec.30AA-ssec.10-def.relevantMinister-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—the Minister administering the resumption law under which the land is, or is to be, taken.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_4abe0a1b-ba8f-40b0-b76e-1e1864fb56ff" id="sec.30AB" provision.type="other" spent.amends="0"><no>30AB</no><heading guid="_ffa82cfd-3537-403d-b241-76f8c6aa07eb" id="sec.30AB-he">Effect of extinguishment of petroleum interests on the taking of land in a petroleum authority’s area (other than by an easement)</heading><subclause affected.by.uncommenced="0" guid="_b1cb0fd4-3d20-45fd-a60b-f6fc9365567f" id="sec.30AB-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, under <intref check="valid" refid="sec.30AA" target.guid="_2bac35d6-219a-4bf4-9209-e7717cd0fd8f">section 30AA</intref>, the resumption notice for the taking of land (other than by taking or otherwise creating an easement) under a resumption law provides for the extinguishment of petroleum interests for stated land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9a2f0e28-9f78-487f-8bfd-40a7740e39a9" id="sec.30AB-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the resumption notice states that all petroleum interests relating to the stated land are extinguished and a petroleum interest relates only to the stated land, the interest is wholly extinguished.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ce5296c7-9c9d-41c8-92ee-dfb0ac036d8e" id="sec.30AB-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the resumption notice states that all petroleum interests relating to the stated land are extinguished and a petroleum interest relates to the stated land and other land—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ea4bc914-7f10-44b7-8770-46bfe8c15c87" id="sec.30AB-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the stated land is no longer the subject of the interest; and</txt></block></li><li guid="_d1f104f9-0086-4968-9a9a-6065422bf82b" id="sec.30AB-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">without limiting <intref check="valid" refid="sec.30AB-ssec.3-para1.a" target.guid="_ea4bc914-7f10-44b7-8770-46bfe8c15c87">paragraph (a)</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9b6434e5-fbab-4330-81c9-34ae116a5edf" id="sec.30AB-ssec.3-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the stated land is excluded from the area of the petroleum authority comprising the interest, or under or in relation to which the interest exists; and</txt></block></li><li guid="_31a8651d-8c90-44ee-9448-9d809a19a628" id="sec.30AB-ssec.3-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">this Act applies, in relation to the area of the petroleum authority, with necessary and convenient changes to allow for the exclusion of the stated land, including, for example—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a9848299-cab0-4216-b2ff-895b69f1672f" id="sec.30AB-ssec.3-para1.b-para2.ii-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">to allow the area to include a part of a block or sub-block if the part is what is left after the stated land is excluded from the area; and</txt></block></li><li guid="_9815a4f5-931d-4e16-acc5-30585383f449" id="sec.30AB-ssec.3-para1.b-para2.ii-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">if the stated land, or a part of it, is within a potential commercial area for an authority to prospect—to exclude the stated land or part from the potential commercial area.</txt></block></li></list></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8d53da5c-4600-43fa-9dfa-c1016d439812" id="sec.30AB-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the resumption notice states that the carrying out of stated activities on the stated land by holders of stated petroleum interests is prohibited, the holder of a stated petroleum interest is not, or is no longer, authorised to carry out the stated activities on the stated land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_76c60d33-b215-4d21-b39c-7d57dc4ea59f" id="sec.30AB-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.30AB-ssec.3" target.guid="_ce5296c7-9c9d-41c8-92ee-dfb0ac036d8e">subsections (3)</intref> and <intref check="valid" refid="sec.30AB-ssec.4" target.guid="_8d53da5c-4600-43fa-9dfa-c1016d439812">(4)</intref> do not apply in relation to a petroleum interest that comprises, or exists under or in relation to, a new or renewed petroleum authority granted after the land is taken.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_9f663574-cdda-4e64-9f8f-6c6102041022" id="sec.30AC" provision.type="other" spent.amends="0"><no>30AC</no><heading guid="_6c5c1cf4-4840-436f-9873-a5881e75aa74" id="sec.30AC-he">Applications relating to land taken under a resumption law for which petroleum interests were extinguished</heading><subclause affected.by.uncommenced="0" guid="_a7c03b34-e315-4028-a675-545d29db0093" id="sec.30AC-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may, under a grant provision, grant a petroleum authority for an area that includes acquired land only if the Minister, after consulting the entity that took the land, is satisfied the grant of the authority is compatible with the purpose for which the land is being or is to be used.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_168c6318-ce24-4d81-96c4-b625431fe5d6" id="sec.30AC-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If there are 2 or more applications under this Act for the grant, under a grant provision, of a new petroleum authority for an area that includes the same acquired land, the applications are to be dealt with as follows—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a6b9ab5e-8474-4501-bc66-7b8335f99771" id="sec.30AC-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the applications must be considered and decided according to the day on which they are lodged;</txt></block></li><li guid="_5ef58f2e-1ecc-482c-94bb-a1f835164115" id="sec.30AC-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the applications were lodged on the same day—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0e914776-af93-429d-9b04-c8d0abcd645e" id="sec.30AC-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">they take the priority the Minister decides, after considering the relative merits of each application; and</txt></block></li><li guid="_deff8354-e50f-41f3-9303-90c167ff0484" id="sec.30AC-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the Minister must give each applicant a notice stating there is competition for priority between the applicant’s application and another application, or other applications, lodged on the same day as the day on which the applicant’s application was lodged.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_75f7d590-62c4-4ad0-89d9-66d823de1e55" id="sec.30AC-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If a grant provision provides for the grant of a new petroleum authority (the <defterm guid="_ca8a1a6c-08b3-4de5-98b8-5041627c70b2" id="sec.30AC-def.newauthority" type="definition">new authority</defterm>) over land in the area of an existing petroleum authority or <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP (the <defterm guid="_3487ddb5-ed28-4635-bb07-2df79de8566c" id="sec.30AC-def.existingauthority" type="definition">existing authority</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7e031ab6-b0bd-469c-b86b-56e86a86faa5" id="sec.30AC-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the application under this Act for the new authority may include acquired land that was, immediately before the taking of the land, in the existing authority’s area; and</txt></block></li><li guid="_7c47d620-3b1b-4d98-9ae5-f6c52da7334f" id="sec.30AC-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">subject to <intref check="valid" refid="sec.30AC-ssec.1" target.guid="_a7c03b34-e315-4028-a675-545d29db0093">subsections (1)</intref> and <intref check="valid" refid="sec.30AC-ssec.2" target.guid="_168c6318-ce24-4d81-96c4-b625431fe5d6">(2)</intref>, the Minister may grant a new authority for an area that includes the acquired land as if the acquired land were in the existing authority’s area.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8d6fe3cc-6eee-47a1-a2f1-cc0e74b3ecf9" id="sec.30AC-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">To remove any doubt, it is declared that this section does not affect the operation of the provisions of this Act about the application for, and grant of, a new petroleum authority other than to the extent provided for in <intref check="valid" refid="sec.30AC-ssec.1" target.guid="_a7c03b34-e315-4028-a675-545d29db0093">subsections (1)</intref> to <intref check="valid" refid="sec.30AC-ssec.3" target.guid="_75f7d590-62c4-4ad0-89d9-66d823de1e55">(3)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_878c009e-299f-4a84-9fbe-55ed3203cac1" id="sec.30AC-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_53bd8dd1-cfef-4255-ad19-5e8ae10e8fcd" id="sec.30AC-ssec.5-def.grantprovision_"><txt break.before="1"><defterm guid="_3020ddae-0112-40b2-9642-ed9c20646f57" id="sec.30AC-ssec.5-def.grantprovision" type="definition">grant provision</defterm> means a provision of this Act providing for the grant of a new petroleum authority.</txt></definition><definition affected.by.uncommenced="0" guid="_8ed4ea81-5c0e-484a-9c70-a616f4bdfb2f" id="sec.30AC-ssec.5-def.newpetroleumauthority_"><txt break.before="1"><defterm guid="_f1d46e0b-b725-466f-b77f-5b09f853710d" id="sec.30AC-ssec.5-def.newpetroleumauthority" type="definition">new petroleum authority</defterm> includes a renewed petroleum authority.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_024c18b9-b596-4308-8f29-01e8b20d4be1" id="sec.30AD" provision.type="other" spent.amends="0"><no>30AD</no><heading guid="_e6ebfd4f-20b9-4278-8325-b37da4445d7f" id="sec.30AD-he">Compensation for effect of taking of land in a petroleum authority’s area on petroleum interests</heading><subclause affected.by.uncommenced="0" guid="_ac974b9b-3942-4a97-936c-2bd8e11754a8" id="sec.30AD-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if land in a petroleum authority’s area is taken (including by taking or otherwise creating an easement) under a resumption law other than <intref check="valid" refid="sec.456" target.guid="_a2ae2083-a7ba-4d2b-a95d-2db6e65409cb">sections 456</intref> to <intref check="valid" refid="sec.458" target.guid="_125a6292-9e16-44c0-815c-1762cb26e09e">458</intref> of this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_eb8ec843-875f-47b7-86db-176fb125dede" id="sec.30AD-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In assessing any compensation to be paid to the holder of a petroleum interest in relation to the taking of the land, allowance can not be made for the value of petroleum known or supposed to be in, or produced from, the land.</txt><note guid="_be1787b2-5bec-4460-983e-2adb5fd14b13" id="sec.30AD-ssec.2-note" type="example"><heading guid="_e1b989bd-22f6-4b59-bc8f-fb5fb7916938" id="sec.30AD-ssec.2-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="sec.458" target.guid="_125a6292-9e16-44c0-815c-1762cb26e09e">section 458</intref><intref check="valid" refid="sec.458-ssec.3" target.guid="_0a605342-993f-4dc4-ada7-bc7bacb66a23">(3)</intref> in relation to land in a petroleum authority’s area taken under <intref check="valid" refid="sec.456" target.guid="_a2ae2083-a7ba-4d2b-a95d-2db6e65409cb">sections 456</intref> to <intref check="valid" refid="sec.458" target.guid="_125a6292-9e16-44c0-815c-1762cb26e09e">458</intref> of this Act.</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7b6e74da-8529-4175-af2a-9cc9a2a0eb32" id="sec.30A" provision.type="other" spent.amends="0"><no>30A</no><heading guid="_54f94b9f-d4b1-4f0d-bc36-1515b9a4df20" id="sec.30A-he">Joint holders of a petroleum authority</heading><subclause affected.by.uncommenced="0" guid="_c5188109-7d15-4106-af4d-69b56d5c397e" id="sec.30A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A petroleum authority may be held by 2 or more persons as joint tenants or as tenants in common.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e84dd4a5-6d26-4f26-8b76-067797784009" id="sec.30A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_40dd6136-dc75-4388-83cc-41fa5b2b06b1" id="sec.30A-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an application is made for a petroleum authority, or for approval to register a transfer of a petroleum authority under the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, for more than 1 proposed holder or transferee; and</txt></block></li><li guid="_754e8b42-3bf6-45c1-967d-1d531844135e" id="sec.30A-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the application does not show whether the proposed holders or transferees are to hold as joint tenants or as tenants in common; and</txt></block></li><li guid="_fd06d6ae-e453-4264-b3ff-d128f8dc2277" id="sec.30A-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the application is granted;</txt></block></li></list></block><block><txt break.before="1">the chief executive must record in the register that the applicants hold the authority as tenants in common.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d818622e-2456-443a-9d09-51382b7f2b26" id="sec.30A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_d0b5a8f9-dcf7-4b55-ae13-39efb916d4c4" id="sec.30A-ssec.3-def.petroleumauthority_"><txt break.before="1"><defterm guid="_8c8f693b-02f4-46fc-8c58-c72e718526f0" id="sec.30A-ssec.3-def.petroleumauthority" type="definition">petroleum authority</defterm> includes a share in a petroleum authority.</txt></definition></deflist></block></subclause></clause></part></chapter><chapter affected.by.uncommenced="0" guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad" id="ch.2"><no>Chapter 2</no><heading guid="_f4b025eb-5ffd-4b4b-a39e-3ee7d23cd35e" id="ch.2-he">Petroleum tenures and related matters</heading><note guid="_c1c55338-2569-45ac-bc63-75034636f468" id="ch.2-note" type="example"><heading guid="_82395c7a-cb5c-4c86-9f24-5766c82b2438" id="ch.2-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_b66c50de-d40b-4aaf-9c01-2c785d40189e" id="ch.2-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">For the requirement for a petroleum tenure, see <intref check="valid" refid="sec.800" target.guid="_3414ab4a-2c38-4af9-b578-754022462d1e">section 800</intref>.</txt></block></li><li guid="_4bed18c7-80df-406e-a22e-d963c26d92ec" id="ch.2-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0"><intref check="valid" refid="ch.3" target.guid="_7d989cb7-da2a-4737-842c-bd1944dbb54e">Chapters 3</intref> and <intref check="valid" refid="ch.3A" target.guid="_4864cab3-5ae5-49c9-aeb6-cdfaa85590af">3A</intref> impose requirements for and restrictions on the granting of and restrictions on authorised activities that may be carried out under particular petroleum tenures. See <intref check="valid" refid="sec.297" target.guid="_58a37fd3-2ce6-4075-b4bc-45256d153e95">sections 297</intref> and <intref check="valid" refid="sec.392AA" target.guid="_b3d37a5b-c60e-464b-b983-09d9afc7da5f">392AA</intref>.</txt></block></li></list></block></note><part affected.by.uncommenced="0" guid="_ae224c28-0e3b-4475-a663-d926bb3b8358" id="ch.2-pt.1"><no>Part 1</no><heading guid="_1e17f7d9-ee93-4682-b415-8071a8ddf1d8" id="ch.2-pt.1-he">Authorities to prospect</heading><division affected.by.uncommenced="0" guid="_7e16aebd-feb5-4967-a527-9711adb9ae66" id="ch.2-pt.1-div.1"><no>Division 1</no><heading guid="_e7ce591a-9ec6-4b5f-b99f-17b0af7c1b39" id="ch.2-pt.1-div.1-he">Key authorised activities</heading><clause affected.by.uncommenced="0" guid="_a9c80261-f05c-4d58-b0d1-33b7df2ca986" id="sec.31" provision.type="other" spent.amends="0"><no>31</no><heading guid="_47a5bb1e-eed2-4951-afde-22dd507e48e1" id="sec.31-he">Operation of <intref check="valid" refid="ch.2-pt.1-div.1" target.guid="_7e16aebd-feb5-4967-a527-9711adb9ae66">div 1</intref></heading><subclause affected.by.uncommenced="0" guid="_64fa8622-3d0f-4d9e-a255-73764d9f55ec" id="sec.31-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This division provides for the key authorised activities for an authority to prospect.</txt><note guid="_189f5641-edaa-4d96-9e18-f54054a7bfa4" id="sec.31-ssec.1-note" type="example"><heading guid="_889f5cb6-d03d-46da-905b-45514822297f" id="sec.31-ssec.1-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_fd53b9bc-0790-4c8c-bfdd-7ea0eeb3cf97" id="sec.31-ssec.1-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">For other authorised activities, see <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.4" target.guid="_b576db0f-1676-41bb-9d2a-0c120f59c456">part 4</intref>, <intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref>, <intref check="valid" refid="ch.5-pt.8" target.guid="_6fd5c183-bb2d-498f-bceb-5e0aff62d198">part 8</intref> and the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-2014-047" target.guid="_78e7ee55-dcff-4087-b0b9-13497e839af3" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">chapter 3</legref>, <legref check="valid" jurisd="QLD" refid="ch.3-pt.2" target.doc.id="act-2014-047" target.guid="_adcc85c6-c389-49c8-b998-858dca31ac1f" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">part 2</legref>.</txt></block></li><li guid="_357f4228-ec8c-4cca-af14-8c10bc211c62" id="sec.31-ssec.1-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">The carrying out of particular activities on particular land in an authority to prospect’s area may not be authorised following the taking of the land under a resumption law. See <intref check="valid" refid="sec.30AB" target.guid="_4abe0a1b-ba8f-40b0-b76e-1e1864fb56ff">section 30AB</intref>.</txt></block></li></list></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_a056fb23-7247-45a6-9fe4-dfc2508e3c92" id="sec.31-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The authorised activities may be carried out despite the rights of an owner or occupier of land on which they are exercised.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f18bdfab-f5d6-4803-b7e4-1dc073aadf8b" id="sec.31-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the carrying out of the authorised activities is subject to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_76c8d4ea-a4f0-41d0-a697-e1ffa1933106" id="sec.31-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0"><intref check="valid" refid="sec.6" target.guid="_6c6a5ac8-799d-44d8-9fef-34a0d04ecce2">section 6</intref>; and</txt></block></li><li guid="_5bf7581a-d27e-4ebc-a0b7-ffa203436c5e" id="sec.31-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0"><intref check="valid" refid="ch.3" target.guid="_7d989cb7-da2a-4737-842c-bd1944dbb54e">chapter 3</intref>, <intref check="valid" refid="ch.3-pt.4" target.guid="_524d4f73-dd39-49b3-b4c7-37b171f90dd6">part 4</intref>, <intref check="valid" refid="ch.3-pt.4-div.2" target.guid="_eda1a8d6-2c2a-455e-ac73-462969bb7c7b">division 2</intref>; and</txt></block></li><li guid="_bfc50863-721b-4e94-8758-6e274c44d0f2" id="sec.31-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0"><intref check="valid" refid="ch.3" target.guid="_7d989cb7-da2a-4737-842c-bd1944dbb54e">chapter 3</intref>, <intref check="valid" refid="ch.3-pt.4A" target.guid="_34c536ba-d768-4ec0-a202-efadfb15c15d">part 4A</intref>; and</txt></block></li><li guid="_dfc1a092-675b-4dc1-aab8-9509c4214df8" id="sec.31-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0"><intref check="valid" refid="ch.3A" target.guid="_4864cab3-5ae5-49c9-aeb6-cdfaa85590af">chapter 3A</intref>, <intref check="valid" refid="ch.3A-pt.5" target.guid="_fa8a3d9c-8f2e-42e4-9995-76304c3d08e0">part 5</intref>; and</txt></block></li><li guid="_bd67c0a0-6dd2-4519-9a43-051462e7c24c" id="sec.31-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">chapters 5 and 9; and</txt></block></li><li guid="_99bf665c-04ca-4689-a108-00e3571beaec" id="sec.31-ssec.3-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">the mandatory and other conditions of the authority; and</txt></block></li><li guid="_9e287cbc-31b3-4653-b03b-82c5727b34a1" id="sec.31-ssec.3-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">any exclusion or restriction provided for in the authority on the carrying out of the activities; and</txt></block></li><li guid="_33300364-4908-4107-bdd6-d936882fb25f" id="sec.31-ssec.3-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">any other relevant Act or law.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_17d2869d-ceaf-4370-9aa7-b69853cdb6a8" id="sec.32" provision.type="other" spent.amends="0"><no>32</no><heading guid="_945cb4bc-7b16-4835-aaa0-a410493e56f6" id="sec.32-he">Exploration and testing</heading><subclause affected.by.uncommenced="0" guid="_f4236083-f0e3-470d-96fe-b93c06180db6" id="sec.32-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The authority to prospect holder may carry out any of the following activities in the area of the authority—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fea194ed-18e6-4c27-bd6c-90fc324f6d33" id="sec.32-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">exploring for petroleum;</txt></block></li><li guid="_a18b664b-f1c0-40c3-851b-710f2dbaf7ad" id="sec.32-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">testing for petroleum production;</txt></block></li><li guid="_12f769f6-6c48-4872-b9c2-ec5a6e4f7436" id="sec.32-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">evaluating the feasibility of petroleum production;</txt></block></li><li guid="_fd30bc55-7f07-43f3-b9c2-925515ddf181" id="sec.32-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">evaluating or testing natural underground reservoirs for the storage of petroleum or a prescribed storage gas;</txt></block></li><li guid="_c0faddc8-c006-496f-be05-ed8e4da1daaa" id="sec.32-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">plugging and abandoning, or otherwise remediating, a bore or well the holder reasonably believes is a legacy borehole and rehabilitating the surrounding area in compliance with the requirements prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9f2119c2-fafb-42aa-ba3b-6a8b4bfcc83a" id="sec.32-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the holder must not carry out any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4a3933cf-c544-44c5-b3c8-361a612e5d83" id="sec.32-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">extraction or production of a gasification or retorting product from coal or oil shale by a chemical or thermal process;</txt></block></li><li guid="_2541e317-f291-4ec3-8594-22bab4cb6898" id="sec.32-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">exploration for coal or oil shale to carry out extraction or production mentioned in <intref check="valid" refid="sec.32-ssec.2-para1.a" target.guid="_4a3933cf-c544-44c5-b3c8-361a612e5d83">paragraph (a)</intref>;</txt></block></li><li guid="_e4ceca67-f922-4d1c-9a83-5cc1cc299eec" id="sec.32-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">GHG stream storage.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_89a1a496-d974-4b33-9c5e-88df00f9993e" id="sec.32-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The carrying out of activities mentioned in <intref check="valid" refid="sec.32-ssec.1" target.guid="_f4236083-f0e3-470d-96fe-b93c06180db6">subsection (1)</intref>, other than exploring for petroleum, is subject to <intref check="valid" refid="sec.71A" target.guid="_4d4a223e-4703-4e99-a040-ab3ece73040e">sections 71A</intref> and <intref check="valid" refid="sec.71B" target.guid="_01de1f46-50df-428a-a2ea-6a79bb7e8c08">71B</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4df2d778-7053-40d4-8e75-4050027030a4" id="sec.32-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The rights under <intref check="valid" refid="sec.32-ssec.1" target.guid="_f4236083-f0e3-470d-96fe-b93c06180db6">subsection (1)</intref> may be exercised only by or for the holder.</txt><note guid="_63c895b9-8db3-4209-a8b6-51801ad066a1" id="sec.32-ssec.4-note" type="example"><heading guid="_0c64f2ef-ca50-4e1b-8b7c-4c2061825048" id="sec.32-ssec.4-note-he">Note—</heading><block><txt break.before="1">For who may exercise the rights for the holder, see <intref check="valid" refid="sec.563" target.guid="_67d472c3-9467-468b-8bb0-c21101321b5e">section 563</intref>.</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_40d20d00-5908-4940-8068-947039fa8c08" id="sec.33" provision.type="other" spent.amends="0"><no>33</no><heading guid="_39d93c47-c5f1-478d-b0a7-c9bd26adb378" id="sec.33-he">Incidental activities</heading><subclause affected.by.uncommenced="0" guid="_50341df4-488a-4111-bf27-0f74c479c215" id="sec.33-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The authority to prospect holder may carry out an activity (an <defterm guid="_aa658add-a59c-4b69-ba7a-481607bd2f49" id="sec.33-def.incidentalactivity" type="definition">incidental activity</defterm>) in the area of the authority if carrying out the activity is reasonably necessary for, or incidental to, an authorised activity under <intref check="valid" refid="sec.32" target.guid="_17d2869d-ceaf-4370-9aa7-b69853cdb6a8">section 32</intref><intref check="valid" refid="sec.32-ssec.1" target.guid="_f4236083-f0e3-470d-96fe-b93c06180db6">(1)</intref> for the authority or another authority to prospect.</txt><note guid="_ee5f14c0-4804-498f-a626-2a1bee19c00a" id="sec.33-ssec.1-note" type="example"><heading guid="_4aab07ee-1e15-409d-86ef-f153e56b8747" id="sec.33-ssec.1-note-he">Examples of incidental activities—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_c243f72d-fcee-44ed-9bd5-cf981421a936" id="sec.33-ssec.1-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">constructing or operating plant or works, including, for example, communication systems, pipelines associated with petroleum testing, powerlines, roads, separation plants, evaporation or storage ponds, tanks and water pipelines</txt></block></li><li guid="_4acf0995-3a78-4c15-8a02-163d5ff1604e" id="sec.33-ssec.1-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">constructing or using temporary structures or structures of an industrial or technical nature, including, for example, mobile and temporary camps</txt></block></li><li guid="_ca0bf5c5-fc6c-4ad7-9264-89f26bc041b8" id="sec.33-ssec.1-note-para1.3" provision.type="other"><no>3</no><block><txt break.before="0">removing vegetation for, or for the safety of, exploration or testing under <intref check="valid" refid="sec.32" target.guid="_17d2869d-ceaf-4370-9aa7-b69853cdb6a8">section 32</intref><intref check="valid" refid="sec.32-ssec.1" target.guid="_f4236083-f0e3-470d-96fe-b93c06180db6">(1)</intref></txt></block></li></list></block></note><note guid="_3bae2fd1-addd-4899-806d-0fd57680f79c" id="sec.33-ssec.1-note-oc.2" type="example"><heading guid="_1364a12f-21e2-4684-97f8-bf59eb8eb41e" id="sec.33-ssec.1-note-oc.2-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="ch.2-pt.10" target.guid="_6f7f9284-5836-4486-b63b-35e219633886">part 10</intref>, <intref check="valid" refid="sec.239" target.guid="_b46a1dd4-f56f-45f1-8398-76293aeff39e">section 239</intref>, <intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref> and <intref check="valid" refid="sec.20" target.guid="_746e989f-44f2-4d9b-9550-13495b74b131">section 20</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_75b3ffec-72af-41c8-abb1-aa4aea265fcb" id="sec.33-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, neither of the following activities is an incidental activity—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3f353e2b-ab8d-4552-900e-7167a54398db" id="sec.33-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">constructing or using a structure, other than a temporary structure, for office or residential accommodation;</txt><note guid="_e4edc45a-a57f-4bd9-91b0-d57218e22204" id="sec.33-ssec.2-para1.a-note" type="example"><heading guid="_f0677a17-d9c1-44ce-be4f-f8d4db2af948" id="sec.33-ssec.2-para1.a-note-he">Note—</heading><block><txt break.before="1">For development generally, see the <legref check="valid" jurisd="QLD" target.doc.id="act-2016-025" target.version.series="d4a7e9d3-f73d-48a3-9459-9be0b66a1c15" type="act"><name emphasis="yes">Planning Act 2016</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-2016-025" target.guid="_42229283-823c-4a26-99f7-756eab8a5578" target.version.series="d4a7e9d3-f73d-48a3-9459-9be0b66a1c15" type="act">chapter 3</legref>.</txt></block></note></block></li><li guid="_27605289-1709-486e-844e-45fa2d7ba3d4" id="sec.33-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the processing of gaseous petroleum, other than gaseous petroleum produced as an unavoidable result of ATP production testing.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_810d89f4-4d97-4165-bb8a-985462dc4bb4" id="sec.33-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_fe141f3c-c3ed-4b90-a92e-f92bbec6cd8f" id="sec.33-ssec.3-def.gaseouspetroleum_"><txt break.before="1"><defterm guid="_c390d90b-4d54-4559-b86f-2f552d444b5d" id="sec.33-ssec.3-def.gaseouspetroleum" type="definition">gaseous petroleum</defterm> means petroleum in a gaseous state.</txt></definition><definition affected.by.uncommenced="0" guid="_bfb2e115-a083-4bea-a681-92b55a4d95e1" id="sec.33-ssec.3-def.processing_"><txt break.before="1"><defterm guid="_d91d3c3f-c5dc-4525-9220-efb7dc2797c4" id="sec.33-ssec.3-def.processing" type="definition">processing</defterm>, of gaseous petroleum, means treating the petroleum to be suitable for transport.</txt></definition></deflist></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_a1146b5d-98c7-49a7-aa91-b3a012b06cc6" id="ch.2-pt.1-div.2"><no>Division 2</no><heading guid="_dc7bd776-5bc6-4c64-8b4c-544d6cc0606d" id="ch.2-pt.1-div.2-he">Obtaining authority to prospect</heading><subdivision affected.by.uncommenced="0" guid="_fe5091cd-cb60-4eb8-ab79-cc8094110fce" id="ch.2-pt.1-div.2-sdiv.1"><no>Subdivision 1</no><heading guid="_9d542308-f257-4eac-8025-3702124ef864" id="ch.2-pt.1-div.2-sdiv.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_5bc33175-8c22-4c59-a02f-113eeac4bfa6" id="sec.34" provision.type="other" spent.amends="0"><no>34</no><heading guid="_cd6f20b5-25ce-43a0-86d0-38f7960d0224" id="sec.34-he">Operation of <intref check="valid" refid="ch.2-pt.1-div.2" target.guid="_a1146b5d-98c7-49a7-aa91-b3a012b06cc6">div 2</intref></heading><subclause affected.by.uncommenced="0" guid="_2fa34788-1266-4544-ae28-14f047dba500" id="sec.34-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This division provides for a process for the granting of authorities to prospect by competitive tender.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_cbbdff78-fbe6-4437-ad56-9a6d0ee0d3a1" id="sec.34-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">To remove any doubt, it is declared that an authority to prospect can only be granted under this division or <intref check="valid" refid="ch.2-pt.1-div.8" target.guid="_9eb4c4fc-afed-4f78-9a67-475a08eb168b">division 8</intref>, <intref check="valid" refid="ch.2-pt.1-div.8-sdiv.2" target.guid="_3cfda009-9166-46c4-b17c-fbd90a12248a">subdivision 2</intref>.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_c8c9cadb-b2ea-4d1b-80bd-f8752db5f93b" id="ch.2-pt.1-div.2-sdiv.2"><no>Subdivision 2</no><heading guid="_a0235507-e837-4266-a2f7-b0681567bbaf" id="ch.2-pt.1-div.2-sdiv.2-he">Competitive tenders</heading><clause affected.by.uncommenced="0" guid="_87b53d9f-6f6c-49a9-ad51-118aa252ae58" id="sec.35" provision.type="other" spent.amends="0"><no>35</no><heading guid="_ecec89da-ab0a-41c8-8973-694de118843d" id="sec.35-he">Call for tenders</heading><subclause affected.by.uncommenced="0" guid="_ef29a118-7272-415a-b72f-d88191fe8b56" id="sec.35-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may publish a gazette notice (a <defterm guid="_ecc9ee34-f29f-4391-9a5b-23263e6cc0f4" id="sec.35-def.callfortenders" type="definition">call for tenders</defterm>) inviting tenders for an authority to prospect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_120ae8b4-7377-489d-b475-e040e000f7e2" id="sec.35-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The call must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3a47d0ee-7c25-4dba-a407-5a81c7d23738" id="sec.35-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the proposed area of the authority; and</txt></block></li><li change="ins" guid="_0b3f10c9-c7ca-45a9-aeed-f903b557eff8" id="sec.35-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the proposed term of the authority; and</txt></block></li><li change="renumber" guid="_2b2c4485-8d4b-4d6c-a340-62cf986603e6" id="sec.35-ssec.2-para1.c" provision.type="other"><no>(<del xml:space="preserve">b</del><ins xml:space="preserve">c</ins>)</no><block><txt break.before="0">that, under <intref check="valid" refid="sec.99" target.guid="_f62b657c-aab4-4609-b4fb-1563f8df8dfb">section 99</intref>, particular land may be excluded land for the authority; and</txt></block></li><li change="ins" guid="_0c0e69bd-bb45-49a1-8dcf-3525267f27fb" id="sec.35-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">that the tenders must be accompanied by a proposed initial work program for the period mentioned in paragraph (h)(ii); and</txt></block></li><li change="ins" guid="_b18d5818-a119-43ce-9de1-5f26b81fe459" id="sec.35-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">whether the proposed initial work program under paragraph (d) must be a proposed work program (activities-based) or a proposed work program (outcomes-based); and</txt></block></li><li change="renumber" guid="_741a7736-a835-4b63-82b6-0ac190b2b60e" id="sec.35-ssec.2-para1.f" provision.type="other"><no>(<del xml:space="preserve">c</del><ins xml:space="preserve">f</ins>)</no><block><txt break.before="0">the day and time by which tenders in response to it must be made (the <defterm guid="_cbb34b63-531a-4a3a-9eea-4280b8edf5fc" id="sec.35-ssec.2-def.closingtime" type="definition">closing time</defterm> for the call); and</txt></block></li><li change="renumber" guid="_eb00dbdc-3e7e-41ed-949f-ef004e329532" id="sec.35-ssec.2-para1.g" provision.type="other"><no>(<del xml:space="preserve">d</del><ins xml:space="preserve">g</ins>)</no><block><txt break.before="0">that the tenders must be lodged before the closing time for the call; and</txt></block></li><li change="renumber" guid="_d6918c74-54bf-4835-9756-6a2f38027506" id="sec.35-ssec.2-para1.h" provision.type="other"><no>(<del xml:space="preserve">e</del><ins xml:space="preserve">h</ins>)</no><block><txt break.before="0">that details about each of the following are available at a stated place—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_873a5459-b74f-451e-b00e-36ae7e2ae8f4" id="sec.35-ssec.2-para1.h-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">any proposed conditions of the authority, other than mandatory conditions, that are likely to impact significantly on exploration in the proposed area;</txt></block></li><li guid="_89fec89b-7073-499d-adbd-fecb5e59b059" id="sec.35-ssec.2-para1.h-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the required program period for the initial work program for the authority;</txt></block></li><li guid="_83d446d8-50bf-4b3c-b96b-81d1b73f0fad" id="sec.35-ssec.2-para1.h-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">any criteria (<defterm guid="_c897dcf1-ce8c-43b3-8e0c-a413414b46b2" id="sec.35-ssec.2-para1.h-def.specialcriteria" type="definition">special criteria</defterm>), other than the work program criteria and capability criteria, proposed to be used to decide whether to grant the authority, or to decide its provisions;</txt></block></li><li guid="_38e98196-6be5-405f-83c5-1d23ca7988c7" id="sec.35-ssec.2-para1.h-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">whether a process for appointing a preferred tenderer involving a cash bid component is to be used for deciding the call;</txt></block></li><li guid="_0dbcead6-ed76-4d6f-85fc-8f507eaa5dd0" id="sec.35-ssec.2-para1.h-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">if any part of the proposed area of the authority is to be subject to an Australian market supply condition—the part of the proposed area and the condition.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_26a270cc-bb5b-45a2-805c-d91f27ddd8cb" id="sec.35-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The call may state other relevant matters, including, for example, matters relevant to the special criteria, work program criteria and capability criteria.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0547fc85-0b5d-4124-b8eb-0f991f81b8f8" id="sec.35-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The area of the authority must comply with <intref check="valid" refid="sec.98" target.guid="_d8fa1eb9-e567-4ac1-aeb1-e74a6cf013c1">section 98</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" change="insReplace" guid="_cec1d91f-2615-48fd-85fc-445112426dc3" id="sec.35-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Subsection (2)(h)(i) does not limit the Minister’s power to decide conditions of the authority if it is granted.</txt></block></subclause><subclause affected.by.uncommenced="0" change="delReplace" guid="_510ecf3d-4c1e-4a30-92a2-45f12c4ae2f8-del" id="sec.35-ssec.5-del" provision.type="other"><no>(5)</no><block><txt break.before="0"><intref check="valid" refid="sec.35-ssec.2" target.guid="_120ae8b4-7377-489d-b475-e040e000f7e2">Subsection (2)</intref><intref check="valid" refid="sec.35-ssec.2-para1.e" target.guid="_d6918c74-54bf-4835-9756-6a2f38027506">(e)</intref><intref check="valid" refid="sec.35-ssec.2-para1.e-para2.i" target.guid="_873a5459-b74f-451e-b00e-36ae7e2ae8f4">(i)</intref> does not limit the Minister’s power under <intref check="valid" refid="sec.42" target.guid="_37ce7fc5-36f4-4382-9a31-d9859bb50de9">section 42</intref> to decide conditions of the authority if it is granted.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_902df7d6-dd34-48e3-80f7-df5ef1af71ac" id="sec.36" provision.type="other" spent.amends="0"><no>36</no><heading guid="_eab5b8e0-f6f4-4c71-8e54-4935130ab4a8" id="sec.36-he">Right to tender</heading><subclause affected.by.uncommenced="0" guid="_504f086e-6478-43dc-b500-69eefb6d145c" id="sec.36-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An eligible person may, by a tender made under <intref check="valid" refid="sec.37" target.guid="_50999155-96d6-4dc5-9120-b2a1fe3800af">section 37</intref>, tender for a proposed authority to prospect the subject of a call for tenders.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_657e25eb-a018-4831-a928-b9d67dca632b" id="sec.36-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the tender can not be made—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f2965c84-56a3-4393-bef5-555d334b61cf" id="sec.36-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">after the closing time for the call; or</txt></block></li><li guid="_e2f8b3dc-5fc3-4f08-a39a-4a1183b9c00f" id="sec.36-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for only part of the area of the proposed authority.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_50999155-96d6-4dc5-9120-b2a1fe3800af" id="sec.37" provision.type="other" spent.amends="0"><no>37</no><heading guid="_e163b47f-e7a0-437d-9652-0653a35d83e9" id="sec.37-he">Requirements for making tender</heading><block><txt break.before="1">A tender for an authority to prospect must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2cb01937-ce3d-42f4-bd25-42f44e703159" id="sec.37-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be lodged in the approved form; and</txt></block></li><li guid="_cb5f2c2c-aded-4b82-82b0-0f25a4f58ae4" id="sec.37-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">address the capability criteria; and</txt></block></li><li guid="_d82954fc-2b93-4721-b4ae-72e687f2e138" id="sec.37-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">include a proposed work program that complies with the initial work program requirements; and</txt></block></li><li guid="_194e0c5d-7de2-454a-87f1-1f04eef668c5" id="sec.37-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">be accompanied by the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0cacf853-66e1-497e-a3a3-fa292dbddb79" id="sec.37-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the fee prescribed under a regulation;</txt></block></li><li guid="_f40847a4-24aa-467e-8732-b963c7a90670" id="sec.37-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if a process for appointing a preferred tenderer involving a cash bid component is to be used for deciding the call—the tenderer’s cash bid.</txt></block></li></list></block></li></list></block></clause><clause affected.by.uncommenced="0" change="ins" guid="_dbcaf870-73c7-4add-a542-0adc5e2819a3" id="sec.37A" provision.type="other" spent.amends="0"><no>37A </no><heading guid="_f3997086-281a-456d-aefa-3b3d9aca16f5" id="sec.37A-he">Rejection of tender if tenderer disqualified</heading><subclause affected.by.uncommenced="0" guid="_e8221398-2f2a-40bb-becd-85ea76243e77" id="sec.37A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister must reject a tender for an authority to prospect if the Minister decides the tenderer is disqualified under the Common Provisions Act, chapter 7 from being granted the authority to prospect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ef8f6a14-0337-41d7-8f4c-325f70e05277" id="sec.37A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On rejection of the tender, the Minister must give the tenderer a notice about the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e09b641c-f557-4388-baa6-47e4dab690c4" id="sec.38" provision.type="other" spent.amends="0"><no>38</no><heading guid="_442dc30a-19b5-46cb-bc81-94f76f49dd7b" id="sec.38-he">Right to terminate call for tenders</heading><subclause affected.by.uncommenced="0" guid="_8947150b-5b3b-4c63-9818-84be67731613" id="sec.38-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may, by gazette notice, terminate a call for tenders at any time before deciding to grant an authority to prospect to a person who has made a tender in response to the call.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f0dcc1d0-c25a-4183-a097-8755c81713dc" id="sec.38-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">All tenders in response to the call lapse when the call is terminated.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d294fe01-3b79-4a1d-8b32-04cec0018caa" id="sec.38-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">No amount, whether by way of compensation, reimbursement or otherwise is payable by the State to any person for or in connection with the termination.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_51ab86b9-b232-492c-a1f5-23dd768670a2" id="sec.38-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, subject to <intref check="valid" refid="sec.40" target.guid="_abb92078-47ba-4f13-a7ba-b46c7d102951">sections 40</intref><intref check="valid" refid="sec.40-ssec.4" target.guid="_ed420419-90cf-4b15-9ab2-ff8e5dfb7074">(4)</intref> and <intref check="valid" refid="sec.845" target.guid="_7a1a35a1-f15a-4e0d-9fda-75368645b812">845</intref><intref check="valid" refid="sec.845-ssec.5" target.guid="_13711718-4175-43b1-bc1d-c30c5b869165">(5)</intref>, the Minister must refund any tender security given by the tenderer.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_b67c53ae-e5c7-414c-93d0-01cbde5384d8" id="ch.2-pt.1-div.2-sdiv.3"><no>Subdivision 3</no><heading guid="_fe900381-11a5-478d-ab03-02ffb0774806" id="ch.2-pt.1-div.2-sdiv.3-he">Deciding tenders</heading><clause affected.by.uncommenced="0" guid="_f419a545-b6a9-4e4a-a9e1-dd6448aa4109" id="sec.39" provision.type="other" spent.amends="0"><no>39</no><heading guid="_e74acefd-41d4-4e60-a59b-7b8168eb4b4a" id="sec.39-he">Process for deciding tenders</heading><subclause affected.by.uncommenced="0" guid="_2a811002-0b5c-46be-a2ab-931ee42b248d" id="sec.39-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.43" target.guid="_2c0b3e46-8914-4834-bfdb-7d2ff2248ba2">section 43</intref>, any process the Minister considers appropriate may be used to decide a call for tenders, including, for example—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b7510adc-0761-4ad6-8ad1-64e563a6af23" id="sec.39-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a process appointing a preferred tenderer on the tenders made in response to the call (whether or not involving a cash bid component); or</txt></block></li><li guid="_e1374f70-9be2-4541-81d8-33fbb15d77bb" id="sec.39-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a process involving short-listing a group of possible preferred tenderers and inviting them to engage in another round of tendering before appointing a preferred tenderer from that group.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_580af21c-8fbb-4d24-b890-a92844f4505f" id="sec.39-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.39-ssec.1" target.guid="_2a811002-0b5c-46be-a2ab-931ee42b248d">subsection (1)</intref>, the Minister may give a tenderer a notice requiring the tenderer to give the Minister, within the reasonable period stated in the notice, information the Minister reasonably requires to assess the tender.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_abb92078-47ba-4f13-a7ba-b46c7d102951" id="sec.40" provision.type="other" spent.amends="0"><no>40</no><heading guid="_10874396-c6cb-4f1d-87f4-6a47ad61153f" id="sec.40-he">Provisions for preferred tenderers</heading><subclause affected.by.uncommenced="0" guid="_ce6e91c9-6808-4ee6-a6df-7a2d4121793f" id="sec.40-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may require a preferred tenderer for the call for tenders to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f40975fa-ca5e-439c-9ba0-b98844d8ada9" id="sec.40-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">pay any amounts necessarily incurred, or to be incurred, to enable the authority to prospect to be granted; and</txt><note guid="_39d29d01-8b99-48bc-abb5-54994e93c824" id="sec.40-ssec.1-para1.a-note" type="example"><heading guid="_f883d976-e1be-448d-8740-04c0a5cc868e" id="sec.40-ssec.1-para1.a-note-he">Example—</heading><block><txt break.before="1">amounts required to comply with the <legref check="invalid" jurisd="CTH" type="act"><name emphasis="no">Commonwealth Native Title Act</name></legref>, <legref check="invalid" jurisd="CTH" refid="pt.2" type="act">part 2</legref>, <legref check="invalid" jurisd="CTH" refid="pt.2-div.3" type="act">division 3</legref>, subdivision P</txt></block></note></block></li><li guid="_3eeebdc1-cfe9-4111-b5ff-b05cb048b25c" id="sec.40-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to do all or any of the following within a stated reasonable period—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6fea16e6-4e48-4c12-85ef-be8152f24f9b" id="sec.40-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">pay the annual rent for the first year of the authority;</txt></block></li><li guid="_36f2b93d-a238-4c41-9d3c-6470783e4e66" id="sec.40-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">give, under <intref check="valid" refid="sec.488" target.guid="_13f8de44-15a4-4a47-a9af-6464bc374dda">section 488</intref>, security for the authority.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_30cae3f0-077d-497e-b86b-69f7202fe219" id="sec.40-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If a preferred tenderer does not—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b4d2edf3-2fc2-4914-a210-34be980c423d" id="sec.40-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">comply with a requirement under <intref check="valid" refid="sec.40-ssec.1" target.guid="_ce6e91c9-6808-4ee6-a6df-7a2d4121793f">subsection (1)</intref>; or</txt></block></li><li guid="_c59db87d-dc6c-41f4-8989-3d0e3b6aa8c8" id="sec.40-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">do all things reasonably necessary to allow an authority to prospect to be granted to the tenderer;</txt></block></li></list></block><block><txt break.before="1">the Minister may revoke the tenderer’s appointment as the preferred tenderer.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6d0b404b-7736-4ef5-bc6f-483c22e856f2" id="sec.40-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, before acting under <intref check="valid" refid="sec.40-ssec.2" target.guid="_30cae3f0-077d-497e-b86b-69f7202fe219">subsection (2)</intref>, the Minister must give the preferred tenderer a reasonable opportunity to provide reasons for, and rectify, the tenderer’s failure to comply with a requirement under <intref check="valid" refid="sec.40-ssec.1" target.guid="_ce6e91c9-6808-4ee6-a6df-7a2d4121793f">subsection (1)</intref> or <intref check="valid" refid="sec.40-ssec.2" target.guid="_30cae3f0-077d-497e-b86b-69f7202fe219">(2)</intref><intref check="valid" refid="sec.40-ssec.2-para1.b" target.guid="_c59db87d-dc6c-41f4-8989-3d0e3b6aa8c8">(b)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ed420419-90cf-4b15-9ab2-ff8e5dfb7074" id="sec.40-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the Minister revokes the appointment of the tenderer as the preferred tenderer under this section, the Minister may—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8f6a32ca-d506-4770-8753-fcedde35defb" id="sec.40-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">retain the whole or part of any tender security given by the tenderer, if the Minister considers it reasonable in the circumstances; and</txt></block></li><li guid="_ddc809c4-9324-4fab-ae11-73b5469a7d3c" id="sec.40-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">appoint another tenderer to be the preferred tenderer.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_46d6e431-6e86-4354-8d2b-e78c5135ad0d" id="sec.41" provision.type="other" spent.amends="0"><no>41</no><heading guid="_2ec050fd-cf9f-40ae-a2a9-1c4017ffcdb9" id="sec.41-he">Deciding whether to grant authority to prospect</heading><subclause affected.by.uncommenced="0" guid="_ba718b7b-885e-40f8-bb53-f0176db0a3ab" id="sec.41-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may, after the closing time for the call for tenders—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_db239713-2190-4a1d-9493-4b34a271136e" id="sec.41-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">grant an authority to prospect to 1 tenderer; or</txt></block></li><li guid="_25318aa5-bab3-4f35-861c-ea5624207979" id="sec.41-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">refuse to grant any authority to prospect.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_43a62525-ec75-495b-8173-166a6a285166" id="sec.41-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5248701e-57ce-47bf-af7d-d18d729dd693" id="sec.41-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before deciding to grant the authority, the Minister must decide whether to approve the applicant’s proposed initial work program for the authority; and</txt></block></li><li guid="_e25e7a27-07cc-4a2b-abe4-d70221160aa8" id="sec.41-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Minister can not grant the authority unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6592fc67-87db-4156-889b-37092b22e55b" id="sec.41-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the tenderer is an eligible person; and</txt></block></li><li guid="_0e48f133-33e8-435e-942c-cd18f33818d9" id="sec.41-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the proposed program has been approved; and</txt></block></li><li guid="_b3bad051-02cf-4efa-9b8e-f5b732abd3ce" id="sec.41-ssec.2-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">a relevant environmental authority for the authority to prospect has been issued.</txt></block></li></list></block></li></list><note guid="_92bd6e9e-6167-4255-83be-f869eab6b911" id="sec.41-ssec.2-note" type="example"><heading guid="_3c6a9b39-a470-4f40-a993-a8e80b478525" id="sec.41-ssec.2-note-he">Note—</heading><block><txt break.before="1">If a tender relates to acquired land, see also <intref check="valid" refid="sec.30AC" target.guid="_9f663574-cdda-4e64-9f8f-6c6102041022">section 30AC</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" change="ins" guid="_460e885d-6140-464f-a252-13ef6ce69117" id="sec.41-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister may impose on the authority the conditions the Minister considers appropriate.</txt></block></subclause><subclause affected.by.uncommenced="0" change="ins" guid="_8b0324ba-5f53-440d-a807-58d72aca24c7" id="sec.41-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Subsection (3) does not limit or otherwise affect section 42(3)(a) or (3A).</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_37ce7fc5-36f4-4382-9a31-d9859bb50de9" id="sec.42" provision.type="other" spent.amends="0"><no>42</no><heading guid="_73629e1a-0d5c-4c93-9d68-dcf27a1188cc" id="sec.42-he">Provisions of authority to prospect</heading><subclause affected.by.uncommenced="0" guid="_0222cc93-4c9a-42d2-88ff-4efcbf0a46bc" id="sec.42-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Each authority to prospect must state its term and area.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2e03002a-fa91-465b-b739-73f91ce08221" id="sec.42-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The term—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e24139aa-735e-44a9-9a7d-14722dc7b6e6" id="sec.42-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must be for at least the required program period for the initial work program for the authority under the call for tenders; but</txt></block></li><li guid="_f17fa1bc-b65e-439a-88b9-5d91cb59772c" id="sec.42-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">must end no later than 12 years after the authority takes effect.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c6fa4223-e7c6-4a72-b46b-700af4d69603" id="sec.42-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The authority may also state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e9ed8cc6-5a06-49d3-87c5-0bb06645ce9b" id="sec.42-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">conditions or other provisions of the authority, other than conditions or provisions that are—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a26c4f61-d79c-453f-b1ea-0c03927c2c90" id="sec.42-ssec.3-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">inconsistent with the mandatory conditions for authorities to prospect; or</txt></block></li><li guid="_97d453fa-6dbb-49e2-8696-2a3b79011612" id="sec.42-ssec.3-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the same as, or substantially the same as, or inconsistent with, any relevant environmental condition for the authority; and</txt></block></li></list></block></li><li guid="_141879f3-cf11-4c72-a5c7-c99dda9d9517" id="sec.42-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the day it takes effect<del xml:space="preserve">; and</del><ins xml:space="preserve">.</ins></txt></block></li><li change="del" guid="_f68a9275-dc05-4d1e-9caa-71e268405bcc-del" id="sec.42-ssec.3-para1.c-del" provision.type="other"><no>(c)</no><block><txt break.before="0">relinquishment days for the authority.</txt><note guid="_740b96e5-5696-4fdd-bf76-e3cfef783a5f-del" id="sec.42-ssec.3-para1.c-note-del" type="example"><heading guid="_438a4934-bde3-4e60-9259-e0b9d722f40d-del" id="sec.42-ssec.3-para1.c-note-he-del">Note—</heading><block><txt break.before="1">For the relinquishment condition of an authority to prospect, see <intref check="valid" refid="sec.65" target.guid="_6aba535d-af2e-4d49-928f-d7162f827d0b">section 65</intref>.</txt></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d088e36e-71fb-4b4c-bb3d-f45fd0c77718" id="sec.42-ssec.3A" provision.type="other"><no>(3A)</no><block><txt break.before="0">The conditions of the authority may include an Australian market supply condition applying to all or part of the area of the authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_40beeca6-4e3b-430a-848f-4ea8c9ddd4e2" id="sec.42-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, the provisions of the authority may exclude or restrict the carrying out of an authorised activity for the authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1ab595d1-6b9a-4df6-9221-ae3e0268707d" id="sec.42-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The day of effect must not be before the day the authority is granted.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e4231b0e-4e40-4dab-b359-078481f5bb9f" id="sec.42-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">If no day of effect is stated, the authority takes effect on the day it is granted.</txt></block></subclause><subclause affected.by.uncommenced="0" change="del" guid="_86529c10-c383-4a70-b93a-5efadb7fe1c9-del" id="sec.42-ssec.7-del" provision.type="other"><no>(7)</no><block><txt break.before="0">Subject to <intref check="valid" refid="ch.2-pt.1-div.3" target.guid="_68a7a1d9-c152-465c-9d27-7eebd1ad4060">division 3</intref>, <intref check="valid" refid="ch.2-pt.1-div.3-sdiv.7" target.guid="_3cb48cda-44fd-4f32-a505-08926bf73a10">subdivision 7</intref>, the first relinquishment day must not be later than 4 years after the day the authority is to take effect.</txt></block></subclause><subclause affected.by.uncommenced="0" change="del" guid="_be37b200-c93f-4077-a9fa-2c9fd5d55067-del" id="sec.42-ssec.8-del" provision.type="other"><no>(8)</no><block><txt break.before="0">The second and any later relinquishment days must not be later than 4 years after the previous relinquishment day.</txt></block></subclause><subclause affected.by.uncommenced="0" change="del" guid="_c51494e6-7752-4865-ad6c-edf7191b5f7d-del" id="sec.42-ssec.9-del" provision.type="other"><no>(9)</no><block><txt break.before="0">If relinquishment days are not stated, its relinquishment days are taken to be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9cd49a7c-ac4a-44c6-b53b-1ac1217b03ca-del" id="sec.42-ssec.9-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">the day that is the fourth anniversary of the authority’s day of effect; and</txt></block></li><li guid="_2a656ddf-f835-40d8-b314-4fe560652cb6-del" id="sec.42-ssec.9-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">each day during its term that is a 4 yearly interval after the day of effect.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_debf6f5c-d4f6-4fc1-b4a2-e95251439836" id="sec.42A" provision.type="other" spent.amends="0"><no>42A </no><heading guid="_b9cc63cb-f949-4d39-b046-669aaa11a2d8" id="sec.42A-he">Amendment of conditions by Minister if exceptional event</heading><subclause affected.by.uncommenced="0" guid="_4ad3201a-d24b-48e4-9936-ad0fd8a0a419" id="sec.42A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the Minister considers the conditions of an authority to prospect must be amended because of an exceptional event affecting the authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9e5750e6-03be-4c0d-8c35-99e3d7954586" id="sec.42A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister may amend the authority by imposing a condition on, or varying or removing a condition of, the authority without application from the holder.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9de93fbb-6d3c-4eed-91d0-a1d1c174151f" id="sec.42A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The amendment takes effect 10 business days after the holder is given the notice or, if the notice states a later day of effect, the later day.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1aaa75ad-51a9-4e40-b5de-f61a378a5d99" id="sec.42A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">This section does not limit section 41(3).</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2c0b3e46-8914-4834-bfdb-7d2ff2248ba2" id="sec.43" provision.type="other" spent.amends="0"><no>43</no><heading guid="_8817b415-530f-4aae-98a7-db3074b170d2" id="sec.43-he">Criteria for decisions</heading><subclause affected.by.uncommenced="0" guid="_c2adeb49-80be-4af0-ac43-765e64fa3a8d" id="sec.43-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The matters that must be considered in deciding whether to grant an authority to prospect or deciding its provisions include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a9a10d49-2e9f-4b63-b1b0-c01c40b6a427" id="sec.43-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">any special criteria; and</txt></block></li><li guid="_b8e20a93-5ccb-435b-af65-d7373d1d19c5" id="sec.43-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the extent to which the Minister is of the opinion that the tenderer is capable of carrying out authorised activities for the authority, having regard to the tenderer’s—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5d92ff03-52d2-47ff-bc77-51ba7e45314a" id="sec.43-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">financial and technical resources; and</txt></block></li><li guid="_a80b3d80-3d42-43b1-b04a-33aa470dfd58" id="sec.43-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">ability to manage petroleum exploration and production; and</txt></block></li></list></block></li><li guid="_e8d272b4-6991-4c98-8b13-ae5ab6f8ea28" id="sec.43-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the applicant’s proposed initial work program.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8551419e-69d5-4651-9584-a88023a8434a" id="sec.43-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The matters mentioned in <intref check="valid" refid="sec.43-ssec.1" target.guid="_c2adeb49-80be-4af0-ac43-765e64fa3a8d">subsection (1)</intref><intref check="valid" refid="sec.43-ssec.1-para1.b" target.guid="_b8e20a93-5ccb-435b-af65-d7373d1d19c5">(b)</intref> are the <defterm guid="_6dec25ef-6f37-4014-88d3-b718164ddbc4" id="sec.43-def.capabilitycriteria" type="definition">capability criteria</defterm>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3327eb7f-f09a-4f95-bb17-256fff05b3e9" id="sec.43-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A person <defterm guid="_288676a7-a77f-4f97-9cd2-54f5761d10cc" id="sec.43-def.satisfies" type="definition">satisfies</defterm> the capability criteria if the Minister forms the opinion mentioned in <intref check="valid" refid="sec.43-ssec.1" target.guid="_c2adeb49-80be-4af0-ac43-765e64fa3a8d">subsection (1)</intref><intref check="valid" refid="sec.43-ssec.1-para1.b" target.guid="_b8e20a93-5ccb-435b-af65-d7373d1d19c5">(b)</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_641741fa-6c83-4c15-a8d7-923b8de07d7d" id="sec.44" provision.type="other" spent.amends="0"><no>44</no><heading guid="_7758fe04-22a2-482f-91f5-5868aba47bb2" id="sec.44-he">Notice to unsuccessful tenderers</heading><subclause affected.by.uncommenced="0" guid="_8e41e1de-6ca8-48a0-a0ce-c3cfe4a7c8ec" id="sec.44-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">After a call for tenders has been decided, each tenderer not granted the authority to prospect must be given notice of the decision.</txt><note guid="_b5ed3db1-dd99-4355-87c0-eb729df6bcaf" id="sec.44-ssec.1-note" type="example"><heading guid="_dad1588a-3c14-499a-8234-2bf727f9b841" id="sec.44-ssec.1-note-he">Note—</heading><block><txt break.before="1">See also the <legref check="valid" jurisd="QLD" target.doc.id="act-1991-100" target.version.series="a8431166-6960-477c-bb90-f63ad3f3c477" type="act"><name emphasis="yes">Judicial Review Act 1991</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.32" target.doc.id="act-1991-100" target.guid="_5843facd-f562-41ab-817d-fe79e7323b25" target.version.series="a8431166-6960-477c-bb90-f63ad3f3c477" type="act">section 32</legref> (Request for statement of reasons).</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_65c102af-8275-4891-a03a-10c980f02b17" id="sec.44-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.40" target.guid="_abb92078-47ba-4f13-a7ba-b46c7d102951">sections 40</intref><intref check="valid" refid="sec.40-ssec.4" target.guid="_ed420419-90cf-4b15-9ab2-ff8e5dfb7074">(4)</intref> and <intref check="valid" refid="sec.845" target.guid="_7a1a35a1-f15a-4e0d-9fda-75368645b812">845</intref><intref check="valid" refid="sec.845-ssec.5" target.guid="_13711718-4175-43b1-bc1d-c30c5b869165">(5)</intref>, the Minister must refund any tender security given by the tenderer.</txt></block></subclause></clause></subdivision></division><division affected.by.uncommenced="0" guid="_68a7a1d9-c152-465c-9d27-7eebd1ad4060" id="ch.2-pt.1-div.3"><no>Division 3</no><heading guid="_d5867ea2-08c2-4772-a1ee-66c2beb78ab5" id="ch.2-pt.1-div.3-he">Work programs</heading><subdivision affected.by.uncommenced="0" guid="_abc0d2d2-761f-4166-94a1-d064d9406ee8" id="ch.2-pt.1-div.3-sdiv.1"><no>Subdivision 1</no><heading guid="_5c51817a-813c-45ae-970c-4fc320053711" id="ch.2-pt.1-div.3-sdiv.1-he"><del xml:space="preserve">Function and purpose</del><ins xml:space="preserve">Types</ins> of work program</heading><clause affected.by.uncommenced="0" change="delReplace" guid="_aa1c1b2f-3033-47ef-8bd4-ea172a582443-del" id="sec.45-del" provision.type="other" spent.amends="0"><no>45</no><heading guid="_6ca5d200-5ad2-48c0-aef3-be1330c6a9f4-del" id="sec.45-he-del">Function and purpose</heading><subclause affected.by.uncommenced="0" guid="_507d8d09-8e07-4b67-b1a2-eba7f3f5a07d-del" id="sec.45-ssec.1-del" provision.type="other"><no>(1)</no><block><txt break.before="0">The work program for an authority to prospect gives detailed information about the nature and extent of activities to be carried out under the authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_726a71c8-3ccb-4f3c-a763-2146648409c7-del" id="sec.45-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">The purposes of giving the information are to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_acc13e76-3479-44e1-ae45-94b71c8efd17-del" id="sec.45-ssec.2-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">allow resource management decisions to be made; and</txt></block></li><li guid="_2e12bf3a-618d-4707-b9bf-36b24901dc6a-del" id="sec.45-ssec.2-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">ensure appropriate development of the authority.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" change="insReplace" guid="_a44ce132-f50c-4c89-838b-d25173344c5e" id="sec.45" provision.type="other" spent.amends="0"><no>45</no><heading guid="_78c2f508-111d-41b6-9809-da5175b77069" id="sec.45-he">Types of work program for authority to prospect</heading><subclause affected.by.uncommenced="0" guid="_0d439868-312e-4986-802e-3558fa532ed7" id="sec.45-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A <defterm guid="_6c9c5a04-689f-4fe0-a6df-e18a9b4217f9" id="sec.45-def.workprogram" type="definition">work program</defterm> for an authority to prospect is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0b4befab-8f77-494c-9df4-0b67e4dd6031" id="sec.45-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a work program (activities-based); or</txt></block></li><li guid="_c010d13f-c813-4574-ae95-9e609eef8a05" id="sec.45-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a work program (outcomes-based).</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1dc5a481-40c2-4f39-8dcc-95eaaf078a40" id="sec.45-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A <defterm guid="_53a08753-3951-4338-b1f7-88d9a69b22f2" id="sec.45-def.workprogramactivitiesbased" type="definition">work program (activities-based)</defterm> for an authority to prospect is a document stating—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_07bd1ad5-9bd3-42b3-acd4-548953e749b6" id="sec.45-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the activities proposed to be carried out during the period of the program; and</txt></block></li><li guid="_81c974c1-a851-4be6-bf13-867215faa188" id="sec.45-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the estimated human, technical and financial resources proposed to be committed to exploration during the period of the program.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5744439d-4a29-496e-bdab-a5b3a5aa31b8" id="sec.45-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A <defterm guid="_ba933297-ef47-4395-bc7e-a012df34b62d" id="sec.45-def.workprogramoutcomesbased" type="definition">work program (outcomes-based)</defterm> for an authority to prospect is a document stating—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7937b295-03e2-4f52-8d33-245915092c23" id="sec.45-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the outcomes proposed to be pursued during the period of the program; and</txt></block></li><li guid="_a2d69b5a-be8e-4fbb-96bc-c313dbcabbfb" id="sec.45-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the strategy for pursuing the outcomes mentioned in paragraph (a); and</txt></block></li><li guid="_77528f9e-b986-4b75-88a2-1c854c5c09cf" id="sec.45-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the information and data proposed to be collected about the existence of petroleum or gas during the period of the program; and</txt></block></li><li guid="_5442efed-3cbf-4071-a754-3801a8e5ad35" id="sec.45-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the estimated human, technical and financial resources proposed to be committed to exploration during the period of the program.</txt></block></li></list></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_26331c58-952c-4d33-a69b-62c5b359750d" id="ch.2-pt.1-div.3-sdiv.2"><no>Subdivision 2</no><heading guid="_48592ee8-39ed-4c79-ace6-9e2989c827eb" id="ch.2-pt.1-div.3-sdiv.2-he">Requirements for proposed initial work programs</heading><clause affected.by.uncommenced="0" guid="_8cfb29a5-2f22-4160-a64a-b2acee99cc5b" id="sec.46" provision.type="other" spent.amends="0"><no>46</no><heading guid="_ebf1993b-faf9-409d-ab98-840c7ce75906" id="sec.46-he">Operation of <del xml:space="preserve"><intref check="valid" refid="ch.2-pt.1-div.3-sdiv.2" target.guid="_26331c58-952c-4d33-a69b-62c5b359750d">sdiv 2</intref></del><ins xml:space="preserve">subdivision 2</ins></heading><block><txt break.before="1">This subdivision provides for requirements (the <defterm guid="_8bf645ba-b712-41f0-99c4-d73b1b5e04a6" id="def.initialworkprogramrequirements" type="definition">initial work program requirements</defterm>) for a proposed <ins xml:space="preserve">initial </ins>work program for a proposed authority to prospect.</txt></block></clause><clause affected.by.uncommenced="0" guid="_915c65b5-5912-481a-bed6-17c7e95e6f93" id="sec.47" provision.type="other" spent.amends="0"><no>47</no><heading guid="_5b88c1da-6923-42a6-b514-e5c30d173ecd" id="sec.47-he">Program period</heading><subclause affected.by.uncommenced="0" guid="_b7ec504e-a498-4181-858a-1b6d49bb5983" id="sec.47-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The proposed <ins xml:space="preserve">initial work </ins>program must state its period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c73fd02c-f32c-44f8-aebb-140c0229fd51" id="sec.47-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The period must be the same as the required period under the relevant call for tenders.</txt></block></subclause></clause><clause affected.by.uncommenced="0" change="delReplace" guid="_2acbbd92-93d8-4a20-88c6-4a2e0ee891d7-del" id="sec.48-del" provision.type="other" spent.amends="0"><no>48</no><heading guid="_c40d8daf-8d9f-4a7a-8246-2b08fa0680d0-del" id="sec.48-he-del">General requirements</heading><subclause affected.by.uncommenced="0" guid="_dcbdf097-6be7-49e7-a1dd-534676429892-del" id="sec.48-ssec.1-del" provision.type="other"><no>(1)</no><block><txt break.before="0">The proposed program must provide for each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ba0545c7-6584-4eda-b66d-0ecb98650243-del" id="sec.48-ssec.1-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">an overview of the activities proposed to be carried out under the authority or proposed authority during all of its term;</txt></block></li><li guid="_b524666f-ee8f-4743-a0d0-891ee444a115-del" id="sec.48-ssec.1-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">for each year of the program period—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ec271654-8569-4fc2-8102-b7870b85e446-del" id="sec.48-ssec.1-para1.b-para2.i-del" provision.type="other"><no>(i)</no><block><txt break.before="0">the extent and nature of petroleum exploration and testing for petroleum production proposed to be carried out during the year; and</txt></block></li><li guid="_cd84246d-26e8-4ea7-81ac-e97156dc00dc-del" id="sec.48-ssec.1-para1.b-para2.ii-del" provision.type="other"><no>(ii)</no><block><txt break.before="0">generally where the activities are proposed to be carried out; and</txt></block></li><li guid="_22e7ed00-dacc-4299-b87a-7c9d89c99b60-del" id="sec.48-ssec.1-para1.b-para2.iii-del" provision.type="other"><no>(iii)</no><block><txt break.before="0">the estimated cost of the activities;</txt></block></li></list></block></li><li guid="_895ffb5d-9f66-42a1-b08b-123bf8cd506f-del" id="sec.48-ssec.1-para1.c-del" provision.type="other"><no>(c)</no><block><txt break.before="0">maps that show where the activities are proposed to be carried out;</txt></block></li><li guid="_6ff9ade8-6bd4-4b43-9b52-fc3f9b2d6b5f-del" id="sec.48-ssec.1-para1.d-del" provision.type="other"><no>(d)</no><block><txt break.before="0">any other information relevant to the matters mentioned in <intref check="valid" refid="sec.49" target.guid="_fc1a4d6c-39e0-45d0-afa8-14a9bfea6511">section 49</intref>;</txt></block></li><li guid="_2b0aefed-162d-4d64-ada6-9d83d513c7b6-del" id="sec.48-ssec.1-para1.e-del" provision.type="other"><no>(e)</no><block><txt break.before="0">reasons why the program is considered appropriate;</txt></block></li><li guid="_e1d3bd36-a234-4a1b-acf4-24c6ab54ee60-del" id="sec.48-ssec.1-para1.f-del" provision.type="other"><no>(f)</no><block><txt break.before="0">another matter prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e847b1e8-2a2c-49b4-9ce7-06d40b31d057-del" id="sec.48-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">A regulation may impose requirements about the form of the work program.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_21053e1d-b38d-4cfb-abc8-5d95a151493e-del" id="sec.48-ssec.3-del" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_1cd4387b-6556-466a-9708-e5c8ba76d70c-del" id="sec.48-ssec.3-def.year_-del"><txt break.before="1"><defterm guid="_d1f514b1-080f-42dd-b7c8-638eaef964f4-del" id="sec.48-ssec.3-def.year-del" type="definition">year</defterm>, of the program period, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_39d77972-f7e9-4972-94ec-c353ede4a432-del" id="sec.48-ssec.3-def.year-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">the period starting on the day the program period starts and ending on the first anniversary of that day; and</txt></block></li><li guid="_8a4c9687-50b3-4c63-8c85-315fd74fe4e4-del" id="sec.48-ssec.3-def.year-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">each subsequent period of 12 months or less during the program period, starting on each anniversary of that day and ending on—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cc28223d-65ea-4d41-9463-c0961b5156d0-del" id="sec.48-ssec.3-def.year-para1.b-para2.i-del" provision.type="other"><no>(i)</no><block><txt break.before="0">the next anniversary of that day; or</txt></block></li><li guid="_7bc61096-2a9d-4f27-8288-a4fa67babc70-del" id="sec.48-ssec.3-def.year-para1.b-para2.ii-del" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the program period ends before the next anniversary—the day the program period ends.</txt></block></li></list></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" change="insReplace" guid="_cd53e62d-e41f-4513-a285-73bcac0e623f" id="sec.48" provision.type="other" spent.amends="0"><no>48</no><heading guid="_ff2b3a1a-ad86-47bb-a1a3-e92de45dc1b6" id="sec.48-he">General requirements</heading><subclause affected.by.uncommenced="0" guid="_ccd3334e-0b5b-4786-962f-d88197aec9d2" id="sec.48-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The proposed initial work program must be of the type required under section 35(2)(e).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fbcbba90-b7aa-4c99-89a6-6181152483ab" id="sec.48-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The proposed initial work program must include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_25ab3410-16f5-48c3-b975-b39b7e01140d" id="sec.48-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">maps that show where the exploration under the proposed authority to prospect is proposed to be carried out; and</txt></block></li><li guid="_59da2437-a975-4f37-8277-8ae40d83191b" id="sec.48-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">reasons why the holder of the proposed authority to prospect considers the program to be appropriate; and</txt></block></li><li guid="_1564a1c6-b65c-4828-ab36-7a61213b36fc" id="sec.48-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">any other information relevant to the work program criteria; and</txt></block></li><li guid="_dec7df74-9648-4e6d-9f1a-af7059ce1091" id="sec.48-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">any other information prescribed by regulation.</txt></block></li></list></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_519758f1-df2b-4639-a6cd-2421a8b25aed" id="ch.2-pt.1-div.3-sdiv.3"><no>Subdivision 3</no><heading guid="_2745425d-7849-444e-a59f-5bb49b5fe879" id="ch.2-pt.1-div.3-sdiv.3-he">Criteria for deciding whether to approve proposed initial work programs</heading><clause affected.by.uncommenced="0" guid="_fc1a4d6c-39e0-45d0-afa8-14a9bfea6511" id="sec.49" provision.type="other" spent.amends="0"><no>49</no><heading guid="_d5fcf21b-d234-4cd9-820b-ef3df463cc0a" id="sec.49-he">Criteria</heading><subclause affected.by.uncommenced="0" guid="_fee8e632-523a-478a-9e67-681de9658e94" id="sec.49-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The matters that must be considered in deciding whether to approve a proposed initial work program include the appropriateness of the tenderer’s proposed work program, having regard to each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b5db931e-ee29-4fc7-b21c-5d969cef59ea" id="sec.49-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the potential of the proposed area of the authority to prospect for petroleum discovery;</txt></block></li><li guid="_b7c46c0f-6849-4d13-b69a-9be9ebbd8926" id="sec.49-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the extent and nature of the proposed petroleum exploration;</txt><note guid="_0322be64-d9ed-444a-99a3-d5a9f833f2ba" id="sec.49-ssec.1-para1.b-note" type="example"><heading guid="_d4e12e5c-af8f-4713-a798-fb60e35a1b55" id="sec.49-ssec.1-para1.b-note-he">Examples—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_329690d3-5591-471a-8fa5-82e386e4e76c" id="sec.49-ssec.1-para1.b-note-para2" provision.type="other"><no>•</no><block><txt break.before="0">proposed geological, geophysical or geochemical surveying</txt></block></li><li guid="_34a56f06-89ff-490e-af5a-dd523f44d8ab" id="sec.49-ssec.1-para1.b-note-para2-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">the number of petroleum wells the tenderer proposes to drill, and their type</txt></block></li></list></block></note></block></li><li guid="_ed6c7b24-96ba-45be-8780-25c11b7c45a1" id="sec.49-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">when and where the tenderer proposes to carry out the exploration.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9e931d94-403f-40bd-93ba-39994453b72f" id="sec.49-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The matters mentioned in <intref check="valid" refid="sec.49-ssec.1" target.guid="_fee8e632-523a-478a-9e67-681de9658e94">subsection (1)</intref> are the <defterm guid="_d97dfa8a-8699-4cd9-9f78-2e476fcea98f" id="sec.49-def.workprogramcriteria" type="definition">work program criteria</defterm>.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_e0d9ada2-7921-4393-9732-97f94b12fd21" id="ch.2-pt.1-div.3-sdiv.4"><no>Subdivision 4</no><heading guid="_be10fd70-c654-4890-ae9a-8b2d11dff008" id="ch.2-pt.1-div.3-sdiv.4-he">Requirements for proposed later work programs</heading><clause affected.by.uncommenced="0" guid="_b741e592-55de-42bb-b041-7a488045dfd8" id="sec.50" provision.type="other" spent.amends="0"><no>50</no><heading guid="_e61bdfb2-725d-4ab1-b41e-4a9678a31590" id="sec.50-he">Operation of <intref check="valid" refid="ch.2-pt.1-div.3-sdiv.4" target.guid="_e0d9ada2-7921-4393-9732-97f94b12fd21">sdiv 4</intref></heading><block><txt break.before="1">This subdivision provides for requirements (the <defterm guid="_f692abd2-d7a6-4216-8686-4153ec3fb543" id="def.laterworkprogramrequirements" type="definition">later work program requirements</defterm>) for a proposed later work program for an authority to prospect.</txt><note guid="_0ae8f983-7136-4fc8-8dd6-bb48c47716bc" id="sec.50-note" type="example"><heading guid="_9de531e7-282f-435c-addd-f54db95672f0" id="sec.50-note-he">Note—</heading><block><txt break.before="1">For the requirements to lodge a proposed later work program, see <intref check="valid" refid="sec.79" target.guid="_4d70b3fa-ec85-47d0-8263-be87e6884f18">sections 79</intref> (Obligation to lodge proposed later work program), 100 (Minister may add excluded land), 104 (Requirements for making application) and 790 (Types of noncompliance action that may be taken).</txt></block></note></block></clause><clause affected.by.uncommenced="0" change="insReplace" guid="_1736a071-7c41-44d5-887e-5e629d9bfdaf" id="sec.51" provision.type="other" spent.amends="0"><no>51</no><heading guid="_4f92d96c-0970-4645-bf80-4e0b29f0306f" id="sec.51-he">General requirements</heading><subclause affected.by.uncommenced="0" guid="_cd3728d8-2a23-4249-bee6-5b865284d4a1" id="sec.51-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The proposed later work program for an authority to prospect may be a work program (activities-based) or work program (outcomes-based).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e1e6d1c9-dfa6-4b4c-8f78-ed729e795cb4" id="sec.51-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The proposed later work program must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9afb99ae-3a0f-4d71-8ae0-79f6bfc6207b" id="sec.51-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the extent to which the current work program for the authority to prospect has been complied with; and</txt></block></li><li guid="_c3ac7421-85ab-4fab-9846-84f2cc2f8a78" id="sec.51-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if there have been any amendments to the authority to prospect or the current work program—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3ec6624a-87f5-4911-8c90-deaa4a3b92fb" id="sec.51-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">whether the changes have been incorporated in the proposed later work program; and</txt></block></li><li guid="_1e9fbddb-647e-42be-b023-95274d0a140a" id="sec.51-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">any effect the changes have on the proposed later work program; and</txt></block></li></list></block></li><li guid="_8799c3cb-1744-4c45-80d8-0e59be53a636" id="sec.51-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the effect of any petroleum discovery on the proposed later work program.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b91cf88d-aa56-4584-a147-a3976612519b" id="sec.51-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The proposed later work program must include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_66f34691-c2f1-42c2-95d3-ff27e5191ca0" id="sec.51-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">maps that show where the exploration under the authority to prospect is proposed to be carried out; and</txt></block></li><li guid="_e423d99d-dae0-4204-8694-8b5b3ca8631e" id="sec.51-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">reasons why the holder of the authority to prospect considers the program to be appropriate; and</txt></block></li><li guid="_ab1b64d8-765e-41ed-b351-3cb62e8bc886" id="sec.51-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">any other information prescribed by regulation.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" change="delReplace" guid="_72948395-3432-4b8e-a096-1c1e09e08027-del" id="sec.51-del" provision.type="other" spent.amends="0"><no>51</no><heading guid="_6de948d1-70f7-4fd6-bb04-998061bceec7-del" id="sec.51-he-del">General requirements</heading><block><txt break.before="1">The proposed program must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_43397f4c-092b-47b0-9f51-0964f9ba0c8c-del" id="sec.51-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">other than in relation to the program period, comply with the initial work program requirements; and</txt></block></li><li guid="_e166f9e1-eb2b-45ef-b50f-0f7a3328ccd8-del" id="sec.51-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">state the extent to which the current work program for the authority to prospect has been complied with; and</txt></block></li><li guid="_fcf4b2b3-7b3b-4597-aba8-9c1c18aacd6d-del" id="sec.51-para1.c-del" provision.type="other"><no>(c)</no><block><txt break.before="0">if there have been any amendments to the authority or the current work program, state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_961e39df-5c41-4e4f-99ef-a4c9aa20f83c-del" id="sec.51-para1.c-para2.i-del" provision.type="other"><no>(i)</no><block><txt break.before="0">whether the changes have been incorporated in the proposed program; and</txt></block></li><li guid="_b0edc4ca-4c29-43a1-af5d-a3ff3988b4bd-del" id="sec.51-para1.c-para2.ii-del" provision.type="other"><no>(ii)</no><block><txt break.before="0">any effect the changes have on the proposed program; and</txt></block></li></list></block></li><li guid="_be06f766-f05e-4de3-8247-a85f2608cc48-del" id="sec.51-para1.d-del" provision.type="other"><no>(d)</no><block><txt break.before="0">state the effect of any petroleum discovery on the proposed program.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_e2de1818-f6f4-4ed3-a400-7ea73c36d4c3" id="sec.52" provision.type="other" spent.amends="0"><no>52</no><heading guid="_999d490a-601f-4d92-a98f-3a2b89699c57" id="sec.52-he">Program period</heading><subclause affected.by.uncommenced="0" guid="_50c700e9-d920-4900-b7bc-355a30b0d909" id="sec.52-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The proposed <ins xml:space="preserve">later work </ins>program must state its period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c598f453-dde0-4173-acca-ce96883e2686" id="sec.52-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The period must not be longer than—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_849eb82d-ce9d-422c-ab79-434d60ebca74" id="sec.52-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the term of the rest, or the renewed term, of the authority is less than <del xml:space="preserve">4</del><ins xml:space="preserve">6</ins> years—the rest of its term or renewed term; or</txt></block></li><li guid="_9793cbd7-5ebf-4b2a-95fa-776ddac356e3" id="sec.52-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the term of the rest, or the renewed term, of the authority is <del xml:space="preserve">4</del><ins xml:space="preserve">6</ins> years or more, the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6ccfc30d-d212-4cd0-8c20-71db11600685" id="sec.52-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">generally—<del xml:space="preserve">4</del><ins xml:space="preserve">6</ins> years from the start of the period;</txt></block></li><li guid="_f68deaf7-1ed3-457d-99ca-b248566d7aa8" id="sec.52-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the Minister approves a longer period—the longer period.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_95b16cab-ed3a-4a17-8935-407c7c8c3a4d" id="sec.52-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the Minister can not approve a period longer than the rest of the term or renewed term of the authority.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_97df3c39-d340-40d2-ae72-4bc2fd522de9" id="sec.53" provision.type="other" spent.amends="0"><no>53</no><heading guid="_df5da51d-1076-493c-925e-9aaede26828e" id="sec.53-he">Implementation of evaluation program for potential commercial area</heading><block><txt break.before="1">If, under <intref check="valid" refid="sec.91" target.guid="_60c29752-ded1-4af7-99b3-0806b280a347">section 91</intref>, an evaluation program is taken to be an additional part of the existing work program for the authority to prospect, the proposed <ins xml:space="preserve">later work </ins>program must include work necessary to implement the evaluation program for the period of that program.</txt></block></clause><clause affected.by.uncommenced="0" guid="_51b3bd97-68ac-4b80-9a8a-e830ad889c10" id="sec.54" provision.type="other" spent.amends="0"><no>54</no><heading guid="_df94cbb3-2d4e-43eb-82ff-e0bf5f37c8ef" id="sec.54-he">Later work programs for proposed new authorities</heading><block><txt break.before="1">Proposed later work programs for an application under <intref check="valid" refid="ch.2-pt.1-div.8" target.guid="_9eb4c4fc-afed-4f78-9a67-475a08eb168b">division 8</intref>, <intref check="valid" refid="ch.2-pt.1-div.8-sdiv.2" target.guid="_3cfda009-9166-46c4-b17c-fbd90a12248a">subdivision 2</intref>, to divide an authority to prospect must have a combined effect that is at least the effect of the work program for the original authority.</txt></block></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_5472fe14-7806-4e7a-a3dd-bb38c4b35e8d" id="ch.2-pt.1-div.3-sdiv.5"><no>Subdivision 5</no><heading guid="_41df558f-b002-46ce-96a3-500e65c135cf" id="ch.2-pt.1-div.3-sdiv.5-he">Approval of proposed later work programs</heading><clause affected.by.uncommenced="0" guid="_059bfbb2-50fb-48cf-aed1-d09c01722fc4" id="sec.55" provision.type="other" spent.amends="0"><no>55</no><heading guid="_0e9bf308-7068-4182-934e-a163f63f259c" id="sec.55-he">Application of <intref check="valid" refid="ch.2-pt.1-div.3-sdiv.5" target.guid="_5472fe14-7806-4e7a-a3dd-bb38c4b35e8d">sdiv 5</intref></heading><block><txt break.before="1">This subdivision applies if, under this Act, a proposed later work program is lodged for approval.</txt></block></clause><clause affected.by.uncommenced="0" guid="_3b8b96d6-8d85-4e4d-8a0c-ed960e2d886e" id="sec.55A" provision.type="other" spent.amends="0"><no>55A</no><heading guid="_e8132d1c-3db3-4b23-a8f1-5b183348a925" id="sec.55A-he">Modified application of <intref check="valid" refid="ch.14" target.guid="_7ee6daab-b446-4e66-bc06-a512720a57d9">ch 14</intref>, <intref check="valid" refid="ch.14-pt.1" target.guid="_108499d8-4a72-4118-bb31-a62f01acaa46">pt 1</intref></heading><block><txt break.before="1"><intref check="valid" refid="ch.14" target.guid="_7ee6daab-b446-4e66-bc06-a512720a57d9">Chapter 14</intref>, <intref check="valid" refid="ch.14-pt.1" target.guid="_108499d8-4a72-4118-bb31-a62f01acaa46">part 1</intref> applies in relation to the lodgement by an authority to prospect holder of a proposed later work program as if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_35d3db27-479b-4b9b-b50a-7ef9549b01d1" id="sec.55A-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the lodgement of the proposed program were the making of an application by the holder; and</txt></block></li><li guid="_e3fde429-e682-4768-a60e-45cde06fee96" id="sec.55A-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the later work program requirements for the proposed program were the requirements under <intref check="valid" refid="ch.14" target.guid="_7ee6daab-b446-4e66-bc06-a512720a57d9">chapter 14</intref>, <intref check="valid" refid="ch.14-pt.1" target.guid="_108499d8-4a72-4118-bb31-a62f01acaa46">part 1</intref> for making the application.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_793152c0-0621-47cd-b9d7-26d582e343d1" id="sec.56" provision.type="other" spent.amends="0"><no>56</no><heading guid="_7c784238-4e1c-4e40-af30-f2345027232c" id="sec.56-he">Authority taken to have work program until decision on whether to approve proposed <ins xml:space="preserve">later </ins>work program</heading><subclause affected.by.uncommenced="0" guid="_89600adc-1018-446c-a6e3-c4715754e9c7" id="sec.56-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies until—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_eab47df4-7ded-4ad3-913f-0e45ef83d489" id="sec.56-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the proposed <ins xml:space="preserve">later work </ins>program is approved—the holder is given notice of the approval; or</txt></block></li><li guid="_1158dd51-077b-4117-95ab-3ca35ff98f38" id="sec.56-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if approval of the proposed <ins xml:space="preserve">later work </ins>program is refused—when the refusal takes effect.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ce451ad8-ffa3-41f8-bcf5-cce94e412cd1" id="sec.56-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite the ending of the program period for the current work program for the authority to prospect—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_56b62452-cef8-4a2f-b6d7-136cc7b2f6f5" id="sec.56-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the authority is taken to have a work program; and</txt></block></li><li guid="_97698e20-86f9-46b2-901f-63663c5d0ff1" id="sec.56-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder may carry out any authorised activity for the authority.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_9ee03665-c4ea-4aca-b97d-3ea968a14644" id="sec.57" provision.type="other" spent.amends="0"><no>57</no><heading guid="_2aaa0711-bddb-424e-83f2-67e038051d7f" id="sec.57-he">Deciding whether to approve proposed <ins xml:space="preserve">later work </ins>program</heading><subclause affected.by.uncommenced="0" guid="_eb42937d-cb35-4d6b-b76d-385b173b7e57" id="sec.57-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may approve or refuse to approve the proposed <ins xml:space="preserve">later work </ins>program.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_73f0c0d2-68a5-4841-8c77-5acf7d80caf5" id="sec.57-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The matters that must be considered in deciding whether to approve the proposed <ins xml:space="preserve">later work </ins>program include each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cfe55c38-c1e6-4598-a172-9a0fdac14362" id="sec.57-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the work program criteria and capability criteria and any special criteria that applied for deciding the application for the authority to prospect;</txt></block></li><li guid="_2d4826c9-f2b2-4142-a2a6-81f398e54fb7" id="sec.57-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the extent to which the current work program has been complied with;</txt></block></li><li guid="_3dbb1adf-3f04-43d1-a84c-cc6075df73ff" id="sec.57-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">any amendments made to the authority or its current work program, and the reasons for the changes;</txt></block></li><li guid="_0300090c-c5b9-4b27-ae50-9851ade660ac" id="sec.57-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">any commercial viability report or independent viability assessment for the authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0e5e7c37-9ade-40fd-92a7-1cc713570e11" id="sec.57-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, if the authority was granted in response to a tender, any other work program proposed by other tenderers for the authority must be taken into account.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d489207c-fcd3-43c7-a538-716ffb930073" id="sec.57-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.57-ssec.3" target.guid="_0e5e7c37-9ade-40fd-92a7-1cc713570e11">subsection (3)</intref> applies only to the extent the other program includes the period of the proposed plan.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_dd1dd486-ead7-4d35-8973-4ac8d2b03e86" id="sec.58" provision.type="other" spent.amends="0"><no>58</no><heading guid="_74f151eb-cbd3-4594-8b1d-9cc434699e21" id="sec.58-he">Steps after, and taking effect of, decision</heading><subclause affected.by.uncommenced="0" guid="_5b8fd7ce-f347-4690-a307-d3c29031eef1" id="sec.58-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">On approval of the proposed later work program, the holder must be given notice of the approval.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_50d20ad6-4508-4fda-b342-c1fa45e9c77d" id="sec.58-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On refusal to approve the later work program, the holder must be given an information notice about the decision to refuse.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_de751a66-a4ee-4855-b239-bd5d5db3f694" id="sec.58-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">An approval takes effect when the holder is given the notice or, if the notice states a later day of effect, on that later day.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8d3c5123-0066-4efa-af74-9f5cfdb7bd21" id="sec.58-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A refusal does not take effect until the end of the appeal period for the refusal.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_32b497cb-19b1-442c-975a-0c9ddae56156" id="ch.2-pt.1-div.3-sdiv.6"><no>Subdivision 6</no><heading guid="_9649ad5b-6b59-4f3d-998a-34b1d12e23c2" id="ch.2-pt.1-div.3-sdiv.6-he">Amending work programs</heading><clause affected.by.uncommenced="0" guid="_c4777b80-9656-4150-984a-4b57debd51ed" id="sec.59" provision.type="other" spent.amends="0"><no>59</no><heading guid="_1d5081c0-fea5-41ab-99bf-39666bd6b7ee" id="sec.59-he">Restrictions on amending work program</heading><subclause affected.by.uncommenced="0" guid="_1e84c094-24e3-444d-9e86-3e61a75ba575" id="sec.59-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An authority to prospect holder may amend the work program for the authority only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f42df5d6-e45b-4674-91ba-40d204fc137e" id="sec.59-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an application for approval of the amendment has been made under this subdivision and the amendment has been approved under this subdivision; and</txt><note guid="_545d5456-9337-4f48-8567-4b91acd3e0d3" id="sec.59-ssec.1-para1.a-note" type="example"><heading guid="_d2be6e7e-c792-49ff-8449-c2f1a68c5edb" id="sec.59-ssec.1-para1.a-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.91" target.guid="_60c29752-ded1-4af7-99b3-0806b280a347">section 91</intref> (Inclusion of evaluation program in work program).</txt></block></note></block></li><li guid="_20dc27cb-d339-479d-80cc-badf3ac6d23f" id="sec.59-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the amendment is to extend the period of the work program—the requirements under <del xml:space="preserve">subsection (2) have been complied with.</del><ins xml:space="preserve"><intref check="valid" refid="sec.59-ssec.2" target.guid="_0ef32709-b7ff-4dfb-986e-d57ecd99ca48">subsection (2) or (3)</intref> have been complied with.</ins></txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" change="insReplace" guid="_ec2cf07c-b7d0-4674-97c0-e8142c676eaf" id="sec.59-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For subsection (1)(b), the requirements for an amendment to extend the period of an approved initial work program for an authority to prospect are—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f06f38d1-bf72-4ccf-90ec-3634987375c0" id="sec.59-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the period of the approved initial work program has not previously been extended; and</txt></block></li><li guid="_5c805282-39f6-43d2-96b4-1bc740e87518" id="sec.59-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">either—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_16e47c69-0638-4e37-a938-b8c8e6aeb4af" id="sec.59-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the Minister is satisfied the amendment is needed for a reason beyond the holder’s control; or</txt></block></li><li guid="_7edb289f-4ea0-4996-b0ef-f65fa0e808b2" id="sec.59-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">within 3 months before the making of the application, the authority to prospect has been transferred within the meaning of subsection (4).</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" change="ins" guid="_f22c0195-e662-4717-a362-a0388985eba5" id="sec.59-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For subsection (1)(b), the requirements for an amendment to extend the period of an approved later work program for an authority to prospect are—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_968c28d5-d447-4482-be30-b2f97bffd4eb" id="sec.59-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the period of the approved later work program, and any earlier approved work program for the authority, has not previously been extended; and</txt></block></li><li guid="_9183d4ec-0e5a-4eb8-b2ab-89189b74309d" id="sec.59-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">within 3 months before the making of the application, the authority to prospect has been transferred within the meaning of subsection (4). </txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" change="ins" guid="_35319930-2a93-46eb-b069-48f9fa0b09f5" id="sec.59-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">For subsection (2) and (3), an authority to prospect is transferred only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b70022e1-40d3-4f82-aa94-8fe676cf2b56" id="sec.59-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a person (the <defterm guid="_2cef7090-d1b7-4328-a895-f8c72d113ab3" id="sec.59-ssec.4-def.designatedperson" type="definition">designated person</defterm>) became a holder of the authority as a result of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ff471d6e-3550-4948-ab4c-4181c4ed4127" id="sec.59-ssec.4-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">an application having been made, under the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Common Provisions Act</name></legref>, for approval of a transfer of a share in the authority; and</txt></block></li><li guid="_ba7c9fdc-1bab-4b17-8575-9bd6ea915065" id="sec.59-ssec.4-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">approval to register the transfer having been given under that Act; and</txt></block></li></list></block></li><li guid="_32293c46-55ef-4fdb-87a7-579b68a17535" id="sec.59-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the share, or proposed share, of the designated person in the authority is at least 50%; and</txt></block></li><li guid="_cc4e58d1-0773-4f4a-a1de-9db08587f995" id="sec.59-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the designated person is not, under the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Corporations Act</name></legref>, section 64B, an entity connected with another person who is a holder of the authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" change="ins" guid="_7390be06-5df7-4ae2-97e1-d6decea5f5e6" id="sec.59-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">An amendment under this section to extend the period of a work program may be granted only if the extended period ends no later than—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_57d40aa4-f8ec-4fba-87c7-d9c4f6111236" id="sec.59-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">1 year after the current period of the work program; or</txt></block></li><li guid="_8fd95534-f093-4e11-8483-82900d17cd53" id="sec.59-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">12 years after the authority originally took effect.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" change="delReplace" guid="_0ef32709-b7ff-4dfb-986e-d57ecd99ca48-del" id="sec.59-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.59-ssec.1" target.guid="_1e84c094-24e3-444d-9e86-3e61a75ba575">subsection (1)</intref><intref check="valid" refid="sec.59-ssec.1-para1.b" target.guid="_20dc27cb-d339-479d-80cc-badf3ac6d23f">(b)</intref>, the requirements are each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_14626b86-39d4-45ed-8b54-92e8227740f1-del" id="sec.59-ssec.2-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">if the work program is the initial work program for the authority—the Minister must be satisfied the work program needs to be amended for a reason beyond the holder’s control;</txt></block></li><li guid="_f4434f52-a858-48c1-afdd-7419a07388e8-del" id="sec.59-ssec.2-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">the period of the work program, or any earlier work program for the authority, must not have previously been extended;</txt></block></li><li guid="_64a6f844-fd94-402f-9c7d-11c04cad5683-del" id="sec.59-ssec.2-para1.c-del" provision.type="other"><no>(c)</no><block><txt break.before="0">the extension can not be for a term that ends after—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a5b2a996-c28b-4a51-bb31-9c358488ec65-del" id="sec.59-ssec.2-para1.c-para2.i-del" provision.type="other"><no>(i)</no><block><txt break.before="0">1 year after the current period of the work program; or</txt></block></li><li guid="_5277bea9-2cfc-471e-9dda-5b0f870e5eaa-del" id="sec.59-ssec.2-para1.c-para2.ii-del" provision.type="other"><no>(ii)</no><block><txt break.before="0">12 years after the authority originally took effect;</txt></block></li></list></block></li><li guid="_a078e7cd-6a54-4f98-8268-19cf87d9b02f-del" id="sec.59-ssec.2-para1.d-del" provision.type="other"><no>(d)</no><block><txt break.before="0">within 3 months before the making of the application, a person (the <defterm guid="_2dc90428-7134-436c-b7e6-0c6c58b6f9f9-del" id="sec.59-ssec.2-def.designatedperson-del" type="definition">designated person</defterm>) became a holder of the authority as a result of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_68001ff0-bfc8-4e55-a001-48c9f2e27303-del" id="sec.59-ssec.2-para1.d-para2.i-del" provision.type="other"><no>(i)</no><block><txt break.before="0">an application having been made, under the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, for approval to register a transfer of a share in the authority; and</txt></block></li><li guid="_77840bb0-0298-4d17-a201-b4446d27fc05-del" id="sec.59-ssec.2-para1.d-para2.ii-del" provision.type="other"><no>(ii)</no><block><txt break.before="0">approval to register the transfer having been given under that Act;</txt></block></li></list></block></li><li guid="_018d4b9a-b578-48b4-8df2-14efaf86dc55-del" id="sec.59-ssec.2-para1.e-del" provision.type="other"><no>(e)</no><block><txt break.before="0">the share, or proposed share, of the designated person in the authority is at least 50%;</txt></block></li><li guid="_418b6002-f925-478a-9486-09ef897bffab-del" id="sec.59-ssec.2-para1.f-del" provision.type="other"><no>(f)</no><block><txt break.before="0">the designated person is not, under the <legref check="invalid" jurisd="CTH" type="act"><name emphasis="no">Corporations Act</name></legref>, <legref check="invalid" jurisd="QLD" refid="sec.64B" type="act">section 64B</legref>, an entity connected with another person who is a holder of the authority.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_80849469-289f-4e21-8fcc-431a62363b00" id="sec.60" provision.type="other" spent.amends="0"><no>60</no><heading guid="_483b58e7-3781-4488-850e-129fe99c5f76" id="sec.60-he">Applying for approval to amend</heading><subclause affected.by.uncommenced="0" guid="_414e17b0-8fc4-426a-86a2-ba9bd34534db" id="sec.60-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An authority to prospect holder may apply for approval to amend the work program for the authority.</txt><note guid="_3542a988-27fd-4e09-82a6-64e59e122346" id="sec.60-ssec.1-note" type="example"><heading guid="_4640d0d9-6b85-4d4a-af6a-974bc2b3ab88" id="sec.60-ssec.1-note-he">Note—</heading><block><txt break.before="1">For other relevant provisions about applications, see <intref check="valid" refid="ch.14" target.guid="_7ee6daab-b446-4e66-bc06-a512720a57d9">chapter 14</intref>, <intref check="valid" refid="ch.14-pt.1" target.guid="_108499d8-4a72-4118-bb31-a62f01acaa46">part 1</intref> and <intref check="valid" refid="sec.851AA" target.guid="_1bb215c0-29c7-436b-85d1-d8220a60416c">section 851AA</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_993939ac-69d6-4596-9d50-d3403de8215a" id="sec.60-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the application can not be made less than 20 business days before the end of the period stated in the work program for carrying out work under the program.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4aab5d25-4efc-4b48-94df-6c1995732d1c" id="sec.60-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0"><intref check="valid" refid="sec.60-ssec.2" target.guid="_993939ac-69d6-4596-9d50-d3403de8215a">Subsection (2)</intref> does not apply if the Minister is satisfied the work program needs to be amended for a reason beyond the holder’s control.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_91d46bf0-127e-49df-81f0-3332a13f0dad" id="sec.60-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The application must be accompanied by the fee prescribed under a regulation.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3de82f6d-a0e1-4633-a9a2-28d63af7dcba" id="sec.62" provision.type="other" spent.amends="0"><no>62</no><heading guid="_e2ce2415-c97a-4553-bd43-bc0ff054203f" id="sec.62-he">Deciding application</heading><subclause affected.by.uncommenced="0" guid="_51e22c4d-7231-4131-b1a8-690fa134cb37" id="sec.62-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the proposed amendment—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fa44233e-4246-43db-8a17-ae58461a1246" id="sec.62-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">does not relate to the initial work program for the authority to prospect; and</txt></block></li><li guid="_6b80f5a6-442e-4677-ace1-612bdedd2c27" id="sec.62-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is to substitute the carrying out of an authorised activity (the <defterm guid="_ed791b0d-2337-43ed-b6b7-72f48a8a1827" id="sec.62-ssec.1-def.originalactivity" type="definition">original activity</defterm>) with another authorised activity;</txt></block></li></list></block><block><txt break.before="1">the Minister may approve the amendment if satisfied the other activity is at least of an equivalent value to the original activity.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2ec7978b-c65e-4755-a084-1678ad1c04bf" id="sec.62-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the application is to extend the period of the work program for the authority, the Minister may approve the amendment only if satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_496f31e0-9ad2-40c4-bc46-29fef65d6484" id="sec.62-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the requirements under <intref check="valid" refid="sec.59" target.guid="_c4777b80-9656-4150-984a-4b57debd51ed">section 59</intref><intref check="valid" refid="sec.59-ssec.2" target.guid="_0ef32709-b7ff-4dfb-986e-d57ecd99ca48">(2)</intref><ins xml:space="preserve"> or (3)</ins> have been complied with; and</txt></block></li><li guid="_032c4278-0a08-4263-b3dc-60c69d467077" id="sec.62-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the designated person mentioned in section 59(<del xml:space="preserve"><intref check="valid" refid="sec.59-ssec.2" target.guid="_0ef32709-b7ff-4dfb-986e-d57ecd99ca48">2) is likely to provide additional financial or technical resources for the authority; and</intref></del><ins xml:space="preserve">4) is likely to provide additional financial or technical resources for the authority; and</ins></txt></block></li><li guid="_943335b0-6afa-416a-b6c5-1ec83dd1ebda" id="sec.62-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the work program will be completed within the period of the extension.</txt><note guid="_2f901427-baab-4ee9-9c1d-bc5087be4d05" id="sec.62-ssec.2-para1.c-note" type="example"><heading guid="_3cbf866d-ef4b-4436-a33a-649fe3a49752" id="sec.62-ssec.2-para1.c-note-he">Note—</heading><block><txt break.before="1">For additional provisions about relinquishment that apply if the period is extended, see <intref check="valid" refid="sec.65" target.guid="_6aba535d-af2e-4d49-928f-d7162f827d0b">sections 65</intref><intref check="valid" refid="sec.65-ssec.1" target.guid="_64068650-a039-4495-af25-c500dfb9692c">(1)</intref><intref check="valid" refid="sec.65-ssec.1-para1.c" target.guid="_9e0c40f5-3c40-4c52-8e95-c1d8e3c13a93">(c)</intref> and <intref check="valid" refid="sec.78A" target.guid="_6279e9f1-bc94-4aea-955c-4937391f60d0">78A</intref>.</txt></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_07a5a85d-e694-48ae-ab87-bc281ed0839d" id="sec.62-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Otherwise, the Minister may approve the amendment only if satisfied it is necessary because of a circumstance—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_785ecdd6-db61-4bb7-8fd2-5abd566ddc9c" id="sec.62-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">not related to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3415616f-150c-410a-8b10-971cc6c731d9" id="sec.62-ssec.3-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the applicant’s financial or technical resources or ability to manage petroleum exploration; or</txt></block></li><li guid="_8cb44ec5-33fb-4445-9a61-d42f5de3ebc5" id="sec.62-ssec.3-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the results of exploration; and</txt></block></li></list></block></li><li guid="_353a6002-cc9d-42ce-8225-b9b6de222011" id="sec.62-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the happening of which is or was beyond the applicant’s control; and</txt></block></li><li guid="_93acc63e-73c4-4139-84b7-b8ada953072d" id="sec.62-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that could not have been prevented by a reasonable person in the applicant’s position.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7fccc3ae-d6ab-4608-ac61-96e0e39ced6e" id="sec.62-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Also, if the amendment is approved under <intref check="valid" refid="sec.62-ssec.3" target.guid="_07a5a85d-e694-48ae-ab87-bc281ed0839d">subsection (3)</intref>, <del xml:space="preserve">any</del><ins xml:space="preserve">the</ins> relinquishment day for the authority may be deferred for a period that relates to a circumstance mentioned in <intref check="valid" refid="sec.62-ssec.3" target.guid="_07a5a85d-e694-48ae-ab87-bc281ed0839d">subsection (3)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" change="insReplace" guid="_781c23ce-2a89-4543-bff1-d491bf344d1a" id="sec.62-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">A deferral under subsection (4) can not be for longer than 12 years after the authority took effect.</txt></block></subclause><subclause affected.by.uncommenced="0" change="delReplace" guid="_a5da1de7-ad07-4211-9ce1-7255122d3e33-del" id="sec.62-ssec.5-del" provision.type="other"><no>(5)</no><block><txt break.before="0">A deferral under <intref check="valid" refid="sec.62-ssec.4" target.guid="_7fccc3ae-d6ab-4608-ac61-96e0e39ced6e">subsection (4)</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e5b889b4-aeb7-4800-ae97-9c388c4dd4de-del" id="sec.62-ssec.5-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">can not be for longer than 12 years after the authority took effect; and</txt></block></li><li guid="_f15161d1-6c13-4636-9936-f4847e49df80-del" id="sec.62-ssec.5-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">does not defer any later relinquishment day for the authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_77cebac4-2b47-431b-9055-2fd2df9b4ca0" id="sec.62-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">If, under this section, an amendment is approved, a condition (an <defterm guid="_47034a75-49aa-4a93-b926-45f4c06b489a" id="sec.62-def.additionalrelinquishmentcondition" type="definition">additional relinquishment condition</defterm>) may be imposed on the authority requiring its holder to relinquish, by a lodged notice, at least a stated percentage of the original notional sub-blocks of the authority on or before a stated day.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c80a5197-d8fb-4f55-8c9f-699a195b375f" id="sec.63" provision.type="other" spent.amends="0"><no>63</no><heading guid="_ab37cc75-b46e-484a-80b7-087546951b3d" id="sec.63-he">Steps after, and taking effect of, decision</heading><subclause affected.by.uncommenced="0" guid="_7bc0b629-4710-4add-bbcc-e64dcce74295" id="sec.63-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">On approval of the proposed amendment, the holder must be given notice of the approval.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_afec84ad-2db4-42da-a91c-219e9b939a24" id="sec.63-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On refusal to approve the proposed amendment, the holder must be given an information notice about the decision to refuse.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_226a4113-2367-43de-89f5-eeda21f679a1" id="sec.63-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">An approval takes effect when the holder is given the notice or, if the notice states a later day of effect, on that later day.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" change="delReplace" guid="_3cb48cda-44fd-4f32-a505-08926bf73a10-del" id="ch.2-pt.1-div.3-sdiv.7-del"><no>Subdivision 7</no><heading guid="_4ba2133e-c576-4499-a241-850ca92225af-del" id="ch.2-pt.1-div.3-sdiv.7-he-del">Special statutory extension of work programs</heading><clause affected.by.uncommenced="0" guid="_438e8ed8-1df2-4ef3-aa93-de05d0efe8f0-del" id="sec.63A-del" provision.type="other" spent.amends="0"><no>63A</no><heading guid="_f325faa0-528d-45c3-ab4d-f555ba66aa76-del" id="sec.63A-he-del">Application of <intref check="valid" refid="ch.2-pt.1-div.3-sdiv.7" target.guid="_3cb48cda-44fd-4f32-a505-08926bf73a10">sdiv 7</intref></heading><block><txt break.before="1">This subdivision applies to the following authorities to prospect—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_79e71dd6-4894-4240-af55-ad9050c44112-del" id="sec.63A-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">an authority granted before 1 July 2014 that is in force immediately before 1 July 2014;</txt></block></li><li guid="_d202c5e4-9253-4f2b-b72b-c285c8e41657-del" id="sec.63A-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">an authority granted under <intref check="valid" refid="sec.41" target.guid="_46d6e431-6e86-4354-8d2b-e78c5135ad0d">section 41</intref> on or after 1 July 2014 if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5c9d8887-13d7-425e-8d27-88644ea82dbd-del" id="sec.63A-para1.b-para2.i-del" provision.type="other"><no>(i)</no><block><txt break.before="0">the holder of the authority is, immediately before 1 July 2014, regarded by the Minister as the preferred tenderer for the call of tenders for the authority; or</txt></block></li><li guid="_7bc02288-ff94-4597-b500-1e7de1c6935f-del" id="sec.63A-para1.b-para2.ii-del" provision.type="other"><no>(ii)</no><block><txt break.before="0">the holder of the authority is, on or after 1 July 2014, regarded by the Minister as the preferred tenderer for the call of tenders for the authority that closes on 29 September 2014.</txt></block></li></list></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_4a51f0a6-74a9-40fc-ba43-487ae2348ad9-del" id="sec.63B-del" provision.type="other" spent.amends="0"><no>63B</no><heading guid="_642d37b4-b720-4500-b8df-ef456f62f786-del" id="sec.63B-he-del">Extension of current work program—authority to prospect for a term of 12 years</heading><subclause affected.by.uncommenced="0" guid="_79309ce2-3e35-49bd-877f-2923d56c69aa-del" id="sec.63B-ssec.1-del" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to an authority to prospect mentioned in <intref check="valid" refid="sec.63A" target.guid="_438e8ed8-1df2-4ef3-aa93-de05d0efe8f0">section 63A</intref><intref check="valid" refid="sec.63A-para1.a" target.guid="_79e71dd6-4894-4240-af55-ad9050c44112">(a)</intref> or <intref check="valid" refid="sec.63A-para1.b" target.guid="_d202c5e4-9253-4f2b-b72b-c285c8e41657">(b)</intref> granted or to be granted for a term of 12 years.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1a460d58-4bce-49c8-a591-a8611d587eb8-del" id="sec.63B-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">The program period for the current work program for the authority to prospect is extended by 2 years—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2abb0c02-054d-4f55-9544-0bd41859c91e-del" id="sec.63B-ssec.2-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">for an authority mentioned in <intref check="valid" refid="sec.63A" target.guid="_438e8ed8-1df2-4ef3-aa93-de05d0efe8f0">section 63A</intref><intref check="valid" refid="sec.63A-para1.a" target.guid="_79e71dd6-4894-4240-af55-ad9050c44112">(a)</intref>—on 1 July 2014; or</txt></block></li><li guid="_f34c0134-ec2f-45a7-822a-cc8df27e77b2-del" id="sec.63B-ssec.2-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">for an authority mentioned in <intref check="valid" refid="sec.63A" target.guid="_438e8ed8-1df2-4ef3-aa93-de05d0efe8f0">section 63A</intref><intref check="valid" refid="sec.63A-para1.b" target.guid="_d202c5e4-9253-4f2b-b72b-c285c8e41657">(b)</intref>—on the day the authority is granted.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_80d88bd2-cdab-4191-af5c-544b9ed9dc48-del" id="sec.63B-ssec.3-del" provision.type="other"><no>(3)</no><block><txt break.before="0">The 2-year extension applies without any requirement to give notice of the extension to the authority to prospect holder.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a73ca66c-aac0-455b-ada5-805935e511ad-del" id="sec.63B-ssec.4-del" provision.type="other"><no>(4)</no><block><txt break.before="0">If the 2-year extension would result in the program period for the work program ending after the 12-year period for the authority to prospect, the effect, if any, of the 2-year extension is that the extension of the program period ends at the end of the 12-year period.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e60d15a1-070c-4526-b79d-fc59d209f39b-del" id="sec.63C-del" provision.type="other" spent.amends="0"><no>63C</no><heading guid="_72e9cc45-ed21-43ca-a52f-d04732c86b3a-del" id="sec.63C-he-del">Extension of current work program—authority to prospect for a term of less than 12 years</heading><subclause affected.by.uncommenced="0" guid="_99878e5a-6120-42af-ae72-41bdff5e63d7-del" id="sec.63C-ssec.1-del" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to an authority to prospect mentioned in <intref check="valid" refid="sec.63A" target.guid="_438e8ed8-1df2-4ef3-aa93-de05d0efe8f0">section 63A</intref><intref check="valid" refid="sec.63A-para1.a" target.guid="_79e71dd6-4894-4240-af55-ad9050c44112">(a)</intref> or <intref check="valid" refid="sec.63A-para1.b" target.guid="_d202c5e4-9253-4f2b-b72b-c285c8e41657">(b)</intref> granted or to be granted for a term of less than 12 years.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0dccd863-9a11-4aa6-a326-0160165a6a0a-del" id="sec.63C-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">The holder of the authority to prospect may apply to the Minister in the approved form to extend the term of the authority to prospect, and the program period for the current work program for the authority, by 2 years.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ffc2fe4d-dc77-4a56-8dd8-7b6f6f46fc7c-del" id="sec.63C-ssec.3-del" provision.type="other"><no>(3)</no><block><txt break.before="0">If the Minister approves the extension, the term of the authority to prospect, and the program period for the current work program, are extended by 2 years.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d0f81e50-bd0c-4796-b903-9aa3c7c5a8c3-del" id="sec.63C-ssec.4-del" provision.type="other"><no>(4)</no><block><txt break.before="0">If the 2-year extension would result in the program period for the work program ending after the term for the authority to prospect ends, the effect, if any, of the 2-year extension is that the extension of the program period ends at the end of the term of the authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_24dde9ca-86aa-4cf5-b4b0-25036e7fd587-del" id="sec.63C-ssec.5-del" provision.type="other"><no>(5)</no><block><txt break.before="0">Only 1 application may be made under this section in relation to the authority to prospect.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_53a847ce-5595-4641-955a-32d52a83920a-del" id="sec.63D-del" provision.type="other" spent.amends="0"><no>63D</no><heading guid="_bbe5aa46-1167-4604-8d57-b0e2547bf23d-del" id="sec.63D-he-del">Applying 2-year extension to current work program for activities</heading><subclause affected.by.uncommenced="0" guid="_607916ba-1056-48d5-ac3a-46e0f7b88f5e-del" id="sec.63D-ssec.1-del" provision.type="other"><no>(1)</no><block><txt break.before="0">The 2-year extension has effect for a work program without any requirement for amending the work program under <intref check="valid" refid="ch.2-pt.1-div.3-sdiv.6" target.guid="_32b497cb-19b1-442c-975a-0c9ddae56156">subdivision 6</intref>, and the extension does not count as a previous extension under <intref check="valid" refid="sec.59" target.guid="_c4777b80-9656-4150-984a-4b57debd51ed">section 59</intref><intref check="valid" refid="sec.59-ssec.2" target.guid="_0ef32709-b7ff-4dfb-986e-d57ecd99ca48">(2)</intref><intref check="valid" refid="sec.59-ssec.2-para1.b" target.guid="_f4434f52-a858-48c1-afdd-7419a07388e8">(b)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_36a4e209-0eea-41c2-8920-14d5edab6b35-del" id="sec.63D-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">Activities provided for in the work program are not changed.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c2961596-3349-4ff0-958a-406d379f9eed-del" id="sec.63D-ssec.3-del" provision.type="other"><no>(3)</no><block><txt break.before="0">Requirements stated in the work program for the carrying out of stated activities are taken to be adjusted to allow for the activities to be undertaken during the extended remaining period for the work program.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_188b0828-e319-40e1-b6cc-925e211e80f4-del" id="sec.63E-del" provision.type="other" spent.amends="0"><no>63E</no><heading guid="_f5d54b5a-b07e-4d5d-b8e3-506db88f2430-del" id="sec.63E-he-del">Applying 2-year extension to relinquishment</heading><subclause affected.by.uncommenced="0" guid="_c4c81f77-0eb0-480f-9562-7ef774f30b1a-del" id="sec.63E-ssec.1-del" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, immediately before the commencement of this subdivision, a relinquishment of a part of the area of an authority to prospect was required to be made—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c7392e93-31d1-420d-9fe7-dd283d9d995b-del" id="sec.63E-ssec.1-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">on a relinquishment day happening on or after the commencement; or</txt></block></li><li guid="_ffb99448-0755-459c-93bd-7a64269cc411-del" id="sec.63E-ssec.1-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">if there was a deferral of a relinquishment day under <intref check="valid" refid="sec.62" target.guid="_3de82f6d-a0e1-4633-a9a2-28d63af7dcba">section 62</intref>—on a day within the period that, on the commencement, becomes the extended remaining period for the work program.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_12b23059-e9fd-4fbd-a1c7-75433a8c59bc-del" id="sec.63E-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">The relinquishment is instead required to be made at the end of the extended remaining period for the work program.</txt></block></subclause></clause></subdivision></division><division affected.by.uncommenced="0" guid="_a7b10fdd-8c1d-453c-9aa7-5f9db0272529" id="ch.2-pt.1-div.4"><no>Division 4</no><heading guid="_8f46f939-d576-4ab8-8750-7351a4ecb7df" id="ch.2-pt.1-div.4-he">Key mandatory conditions for authorities to prospect</heading><subdivision affected.by.uncommenced="0" guid="_7de56b0a-631a-4e98-ac32-72d1af010d3b" id="ch.2-pt.1-div.4-sdiv.1"><no>Subdivision 1</no><heading guid="_b92d1cc2-3bfc-4125-96f4-10ed1f82838f" id="ch.2-pt.1-div.4-sdiv.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_4ad57190-660c-4169-aeff-c989023e4e22" id="sec.64" provision.type="other" spent.amends="0"><no>64</no><heading guid="_2c313afa-e3c5-42c5-93c6-420a516af72a" id="sec.64-he">Operation of <intref check="valid" refid="ch.2-pt.1-div.4" target.guid="_a7b10fdd-8c1d-453c-9aa7-5f9db0272529">div 4</intref></heading><block><txt break.before="1">This division provides for particular mandatory conditions for authorities to prospect.</txt><note guid="_eaa5c5dd-2410-49a4-b148-168e789c5d21" id="sec.64-note" type="example"><heading guid="_1957c721-df86-4268-81ef-af1d4e4229f2" id="sec.64-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_5663816b-cc5e-400e-bfd6-cb5cedc4330c" id="sec.64-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">The following provisions also impose mandatory conditions on authorities to prospect—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b24d6e19-0811-4a7b-86df-fb170345f2ed" id="sec.64-note-para1.1-para2" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="ch.2-pt.1-div.1" target.guid="_7e16aebd-feb5-4967-a527-9711adb9ae66">division 1</intref></txt></block></li><li guid="_91e076af-5d77-4fc9-b405-85096f555356" id="sec.64-note-para1.1-para2-oc.2" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="ch.2-pt.4" target.guid="_b576db0f-1676-41bb-9d2a-0c120f59c456">parts 4</intref> and <intref check="valid" refid="ch.2-pt.10" target.guid="_6f7f9284-5836-4486-b63b-35e219633886">10</intref></txt></block></li><li guid="_aa5edcd2-7e4b-47b1-9436-518bc146cfc9" id="sec.64-note-para1.1-para2-oc.3" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="sec.181" target.guid="_a675db94-8efd-49c4-a0a5-c63c54c8b14b">sections 181</intref> and <intref check="valid" refid="sec.202" target.guid="_30750e13-e21b-469c-b848-00dc23ab09f3">202</intref></txt></block></li><li guid="_b1448317-4fc0-45cf-a4af-7925038a8e2c" id="sec.64-note-para1.1-para2-oc.4" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="ch.3" target.guid="_7d989cb7-da2a-4737-842c-bd1944dbb54e">chapter 3</intref>, <intref check="valid" refid="ch.3-pt.4" target.guid="_524d4f73-dd39-49b3-b4c7-37b171f90dd6">part 4</intref>, <intref check="valid" refid="ch.3-pt.4-div.4" target.guid="_05c78981-f7e7-4468-94ee-9e7bfbc35754">division 4</intref></txt></block></li><li guid="_c120a3d9-98f8-47d3-b779-85ed390ba697" id="sec.64-note-para1.1-para2-oc.5" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="ch.3A" target.guid="_4864cab3-5ae5-49c9-aeb6-cdfaa85590af">chapter 3A</intref>, <intref check="valid" refid="ch.3A-pt.5" target.guid="_fa8a3d9c-8f2e-42e4-9995-76304c3d08e0">part 5</intref></txt></block></li><li guid="_5c6f6521-a665-4b79-9009-745d924c2d8c" id="sec.64-note-para1.1-para2-oc.6" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref>.</txt></block></li></list></block></li><li guid="_f03a1c1f-9fcb-47a5-955e-54ec2be3114f" id="sec.64-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">For what is a mandatory condition, see <intref check="valid" refid="sec.20" target.guid="_746e989f-44f2-4d9b-9550-13495b74b131">section 20</intref><intref check="valid" refid="sec.20-ssec.2" target.guid="_6716699a-7cd3-4f35-945e-49a35a3ccdd3">(2)</intref>.</txt></block></li></list></block></note></block></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_7ee6e428-3bad-4592-8f2c-1707222bc205" id="ch.2-pt.1-div.4-sdiv.2"><no>Subdivision 2</no><heading guid="_c9ca3bad-bd03-4dc6-a550-d38fc0639c16" id="ch.2-pt.1-div.4-sdiv.2-he">Standard relinquishment condition and related provisions</heading><clause affected.by.uncommenced="0" change="ins" guid="_84a088fd-4d11-4875-ad82-0f6ce0f2bf88" id="sec.64A" provision.type="other" spent.amends="0"><no>64A</no><heading guid="_caec3ddb-1ca3-4bb8-bd69-03954bc6ae29" id="sec.64A-he">What is the <defterm guid="_02fe84ed-15ff-421a-99f2-42147a2a3e27" id="sec.64A-def.relinquishmentday" type="definition">relinquishment day</defterm></heading><block><txt break.before="1">The <defterm guid="_5aeddb29-ef06-48ff-9bb5-e19aa2a578a0" id="def.relinquishmentday" type="definition">relinquishment day</defterm>, for an authority to prospect, is the day before the sixth anniversary of the day the authority took effect.</txt></block></clause><clause affected.by.uncommenced="0" guid="_6aba535d-af2e-4d49-928f-d7162f827d0b" id="sec.65" provision.type="other" spent.amends="0"><no>65</no><heading guid="_7681dddd-e9c1-43c6-9f19-ccb637d4c07e" id="sec.65-he">Standard relinquishment condition</heading><subclause affected.by.uncommenced="0" guid="_64068650-a039-4495-af25-c500dfb9692c" id="sec.65-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">It is a condition (the <defterm guid="_63d57f8c-4c1f-4cab-8d59-30803446488c" id="sec.65-def.relinquishmentcondition" type="definition">relinquishment condition</defterm>) of each authority to prospect that its holder must relinquish part of its area, as provided for under this subdivision—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f0aef5f1-e802-48d2-b694-a50e02c3d814" id="sec.65-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">on or before <del xml:space="preserve">each of its relinquishment days</del><ins xml:space="preserve">the relinquishment day for the authority</ins>; and</txt></block></li><li guid="_55e6c4f8-0b1b-4879-a286-2be7c2dfc7e0" id="sec.65-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if <intref check="valid" refid="sec.68" target.guid="_eed347bf-3dbd-42d9-846a-55e64421bfb4">section 68</intref><intref check="valid" refid="sec.68-ssec.3" target.guid="_9c02141e-4995-4c94-a81c-3bf2c8368a12">(3)</intref> applies—on the day provided for under that subsection; and</txt></block></li><li guid="_9e0c40f5-3c40-4c52-8e95-c1d8e3c13a93" id="sec.65-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if, under <intref check="valid" refid="ch.2-pt.1-div.3" target.guid="_68a7a1d9-c152-465c-9d27-7eebd1ad4060">division 3</intref>, <intref check="valid" refid="ch.2-pt.1-div.3-sdiv.6" target.guid="_32b497cb-19b1-442c-975a-0c9ddae56156">subdivision 6</intref>, the period of the work program for the authority has been extended—the day on which the extended period ends.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" change="insReplace" guid="_baf40148-49e2-4a29-826a-e232580d07e2" id="sec.65-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if, under section 62(4), the relinquishment day for the authority (the <defterm guid="_f26717c2-0ef1-4d42-b8e6-193135191dd9" id="sec.65-def.originalday" type="definition">original day</defterm>) is deferred for a stated period, for the relinquishment condition, the relinquishment that was required on or before the original day is taken to have been deferred until the end of the stated period.</txt></block></subclause><subclause affected.by.uncommenced="0" change="delReplace" guid="_be739fce-b6d8-4a33-aca4-193ad3f09fde-del" id="sec.65-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if, under <intref check="valid" refid="sec.62" target.guid="_3de82f6d-a0e1-4633-a9a2-28d63af7dcba">section 62</intref><intref check="valid" refid="sec.62-ssec.4" target.guid="_7fccc3ae-d6ab-4608-ac61-96e0e39ced6e">(4)</intref>, a relinquishment day for the authority (the <defterm guid="_34dc008c-a0ac-4a3c-862b-3679bf6fc5a2-del" id="sec.65-def.originalday-del" type="definition">original day</defterm>) is deferred for a stated period, for the relinquishment condition—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2b37c410-b032-4368-85af-15444c38c99f-del" id="sec.65-ssec.2-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">the relinquishment that was required on or before the original day is taken to have been deferred until the end of the stated period; but</txt></block></li><li guid="_d1cc64b4-88cd-483f-981b-1ab568b26c97-del" id="sec.65-ssec.2-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">the relinquishments required under the relinquishment condition on any later relinquishment days for the authority must be made as if the deferral has not been granted.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_aba5358d-cdb0-4348-b577-8d9cf1a8fbce" id="sec.65-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A relinquishment required under the relinquishment condition—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d1c210c4-93bd-4c8e-a2b8-aa876d0bb23e" id="sec.65-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must be made by a lodged notice (<defterm guid="_b4aaa322-13c7-4df9-82a3-3414092ed7f0" id="sec.65-ssec.3-def.relinquishmentnotice" type="definition">relinquishment notice</defterm>); and</txt></block></li><li guid="_b452e03a-e61a-47ca-8bbf-0e7d08aa0bc4" id="sec.65-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">takes effect on the day after lodgement under <intref check="valid" refid="sec.65-ssec.3-para1.a" target.guid="_d1c210c4-93bd-4c8e-a2b8-aa876d0bb23e">paragraph (a)</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_40f98736-4bf1-4f2e-ac4b-b6e3857cd5ec" id="sec.65-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">This section does not prevent the holder from relinquishing, by relinquishment notice, more than the part provided for under this subdivision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a77f3015-c4a4-4157-bfad-b13e339bc82b" id="sec.65A" provision.type="other" spent.amends="0"><no>65A</no><heading guid="_d06a3bf2-28f2-424b-9343-677301d35d92" id="sec.65A-he">Consequence of failure to comply with relinquishment condition</heading><subclause affected.by.uncommenced="0" guid="_cfb9b989-2019-4b04-b487-5b18ae22f336" id="sec.65A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the holder of an authority to prospect does not comply with the relinquishment condition the holder must be given a notice requiring the holder to comply with the condition within 20 business days after the giving of the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b05226f1-4fd4-4363-92ab-f29a286c6f98" id="sec.65A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the holder does not comply with the requirement, the authority to prospect is cancelled.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_fd7ab3a4-d130-420e-a30c-56eef0914255" id="sec.66" provision.type="other" spent.amends="0"><no>66</no><heading guid="_314fe5f5-d83d-4066-9dec-5d9fa78b5890" id="sec.66-he">Part usually required to be relinquished</heading><subclause affected.by.uncommenced="0" guid="_d164353b-a310-4d21-b319-590fa2ab213c" id="sec.66-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section is subject to sections <ins xml:space="preserve">66A, </ins>68 and <intref check="valid" refid="sec.69" target.guid="_e47e6ada-1fbc-4533-9cb1-fd1d7cdfd57a">69</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" change="insReplace" guid="_4208b9ba-505b-4a36-9164-2880bbea84b9" id="sec.66-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The holder must relinquish 50% of the original notional sub-blocks of the authority to prospect by the end of the relinquishment day.</txt></block></subclause><subclause affected.by.uncommenced="0" change="delReplace" guid="_833caa19-c867-4a2c-9872-fd11edc26861-del" id="sec.66-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">The relinquishment for each relinquishment day, and any other day mentioned in <intref check="valid" refid="sec.65" target.guid="_6aba535d-af2e-4d49-928f-d7162f827d0b">section 65</intref><intref check="valid" refid="sec.65-ssec.1" target.guid="_64068650-a039-4495-af25-c500dfb9692c">(1)</intref><intref check="valid" refid="sec.65-ssec.1-para1.b" target.guid="_55e6c4f8-0b1b-4879-a286-2be7c2dfc7e0">(b)</intref> or <intref check="valid" refid="sec.65-ssec.1-para1.c" target.guid="_9e0c40f5-3c40-4c52-8e95-c1d8e3c13a93">(c)</intref> that applies to the authority, must be such that by that day at least 8.33% of the original notional sub-blocks of the authority to prospect have been relinquished for each year that has passed since the authority originally took effect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_01aeb80e-2294-4a78-8428-b4045f6a5e09" id="sec.66-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The sub-blocks required to be relinquished under this section is the <defterm guid="_8998146e-3f85-4460-b04b-3b3d0b767685" id="sec.66-def.usualrelinquishment" type="definition">usual relinquishment</defterm>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_3583ec1f-16dc-4897-afff-8c3790d9fd0f" id="sec.66A" provision.type="other" spent.amends="0"><no>66A</no><heading guid="_df11061e-4993-4e31-8816-daf8dcfe8acb" id="sec.66A-he">Standard relinquishment condition deferred while petroleum lease application is undecided</heading><subclause affected.by.uncommenced="0" guid="_85c7fe5c-2697-4590-bced-653edecb1d78" id="sec.66A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_28f0fbc5-bfdd-4117-a57a-b23a342b85db" id="sec.66A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the holder of an authority to prospect has made an application for a petroleum lease in relation to an identified area; and</txt></block></li><li guid="_f84cad46-f784-4398-b28e-af067c23da7e" id="sec.66A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">at the end of the relinquishment day, the application has not been decided.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6cc56e33-a920-4de3-9214-80c334c5015a" id="sec.66A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Section 66 does not apply to the authority to prospect in relation to the identified area until—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d92b6e7c-88a2-4a9c-990b-e4ed457a4c02" id="sec.66A-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the petroleum lease is granted; or</txt></block></li><li guid="_c3aec64e-1b2a-4c7f-91ed-8e78fb92a2f6" id="sec.66A-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">20 business days after the day the application is withdrawn or refused.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_cef20488-aa63-414c-b305-b1100e36aa8e" id="sec.66A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_bcb0c11d-6ad1-4e81-9f07-64a7d298e3cd" id="sec.66A-ssec.3-def.identifiedarea_"><txt break.before="1"><defterm guid="_aee735d0-f1c3-4fd3-9a97-753c83063610" id="sec.66A-ssec.3-def.identifiedarea" type="definition">identified area</defterm> means the sub-blocks of land identified in a relinquishment notice as the sub-blocks of land to which an authority to prospect will not apply after a reduction required under section 66(2).</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_1bc6ca38-e8d6-4e8e-b7cc-ef9e8e5fe67b" id="sec.66B" provision.type="other" spent.amends="0"><no>66B</no><heading guid="_6e8c94b7-02db-481d-b4eb-1a885d90a166" id="sec.66B-he">Sub-blocks that may be counted towards relinquishment</heading><subclause affected.by.uncommenced="0" guid="_a8bfad98-ae6d-46bd-a148-e08f2013df98" id="sec.66B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, before a relinquishment day, the area of an authority to prospect is reduced under section 101 by the grant of a petroleum lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a08614ef-5337-422b-ad64-31152043eeb3" id="sec.66B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The sub-blocks in the area of the authority to prospect reduced by the grant may be counted as sub-blocks relinquished for the relinquishment condition.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_de5f1794-8afa-485f-b967-f7198ca6f8a1" id="sec.67" provision.type="other" spent.amends="0"><no>67</no><heading guid="_45765b76-a539-48e9-96d4-b20dd941a9ec" id="sec.67-he">Sub-blocks that can not be counted towards relinquishment</heading><subclause affected.by.uncommenced="0" guid="_03dedaa6-626e-44e8-915c-6e9586c37de5" id="sec.67-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The following can not be counted as sub-blocks relinquished for the relinquishment condition—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_eef5cb66-1cc6-4ce0-ae31-500041524006" id="sec.67-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">sub-blocks relinquished under an additional relinquishment condition;</txt></block></li><li change="del" guid="_02681cf4-4297-4e92-85ab-77e10dc38d68-del" id="sec.67-ssec.1-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">sub-blocks in an area that, under <intref check="valid" refid="sec.101" target.guid="_ecb16f24-7357-4c3c-87b6-6fbc88f80008">section 101</intref>, has ceased to be included in the authority to prospect;</txt></block></li><li change="renumber" guid="_b06f5c7e-ec3d-40bd-a6a9-cec2916f7508" id="sec.67-ssec.1-para1.b" provision.type="other"><no>(<del xml:space="preserve">c</del><ins xml:space="preserve">b</ins>)</no><block><txt break.before="0">the mere declaration of the sub-blocks as a potential commercial area for the authority;</txt></block></li><li change="renumber" guid="_f3548c18-59ab-46c2-9f75-a87e4f1fbe8f" id="sec.67-ssec.1-para1.c" provision.type="other"><no>(<del xml:space="preserve">d</del><ins xml:space="preserve">c</ins>)</no><block><txt break.before="0">sub-blocks the subject of an application for a <del xml:space="preserve">petroleum lease or </del>potential commercial area;</txt></block></li><li change="renumber" guid="_9014bcd5-e5f9-4d59-bbcd-c5450c84cb31" id="sec.67-ssec.1-para1.d" provision.type="other"><no>(<del xml:space="preserve">e</del><ins xml:space="preserve">d</ins>)</no><block><txt break.before="0">sub-blocks relinquished under a penalty relinquishment.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2ff39b87-8dd0-47d3-aa7b-10a9920a5149" id="sec.67-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">To remove any doubt, it is declared that a potential commercial area can be relinquished and can be counted as an area relinquished for the relinquishment condition.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_83446b4c-20a7-4323-a07f-7b185a4f98c2" id="sec.67-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_6201c345-ca60-431b-9370-37f4aaa074b9" id="sec.67-ssec.3-def.penaltyrelinquishment_"><txt break.before="1"><defterm guid="_a548f684-ee67-4cf4-b82e-81395bacae24" id="sec.67-ssec.3-def.penaltyrelinquishment" type="definition">penalty relinquishment</defterm> means a relinquishment that is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a47bcda6-0c28-4c6c-b281-40aa22b798a9" id="sec.67-ssec.3-def.penaltyrelinquishment-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">made under <intref check="valid" refid="sec.78A" target.guid="_6279e9f1-bc94-4aea-955c-4937391f60d0">section 78A</intref> or under a requirement under <intref check="valid" refid="sec.790" target.guid="_0ae40873-0f6d-4440-a74c-a02fa5649d4f">section 790</intref><intref check="valid" refid="sec.790-ssec.1" target.guid="_e5b16464-3b1b-49f2-9d8e-3b9d7c76d4ad">(1)</intref><intref check="valid" refid="sec.790-ssec.1-para1.b" target.guid="_be540110-8922-4c58-9559-fa56156b036c">(b)</intref>; and</txt></block></li><li guid="_57f06a18-5aca-4899-8d9a-31b05e83a794" id="sec.67-ssec.3-def.penaltyrelinquishment-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">more than the sub-blocks required to be relinquished under the relinquishment condition.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_eed347bf-3dbd-42d9-846a-55e64421bfb4" id="sec.68" provision.type="other" spent.amends="0"><no>68</no><heading guid="_8f5e8ac5-052d-4a82-a4e8-2c31f7846328" id="sec.68-he">Adjustments for sub-blocks that can not be counted</heading><subclause affected.by.uncommenced="0" guid="_afa1e0d2-875c-4baf-84c0-1eb9113cd925" id="sec.68-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies for <del xml:space="preserve">a</del><ins xml:space="preserve">the</ins> relinquishment day<ins xml:space="preserve"> for an authority to prospect</ins> if, after taking away all sub-blocks that, under <intref check="valid" refid="sec.67" target.guid="_de5f1794-8afa-485f-b967-f7198ca6f8a1">section 67</intref>, can not be counted for the relinquishment condition, the balance of the sub-blocks of the authority to prospect is less than the sub-blocks required to be relinquished under the usual relinquishment.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_77db68b2-4ed6-4e39-95e5-9848fe9bbb11" id="sec.68-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The relinquishment condition is taken to have been complied with if the authority holder gives a relinquishment notice for all of the balance.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9c02141e-4995-4c94-a81c-3bf2c8368a12" id="sec.68-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_903af81a-3e90-4e48-98e1-1c36bbe1543b" id="sec.68-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a sub-block not counted for the relinquishment condition was the subject of an application for a <del xml:space="preserve">petroleum lease or </del>potential commercial area; and</txt></block></li><li guid="_b486dfdb-67b5-484d-943b-e24e63a9b23a" id="sec.68-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the result of the application is that it is refused;</txt></block></li></list></block><block><txt break.before="1">the authority holder must, within 20 business days after the appeal period for the decision to refuse, give a relinquishment notice for that sub-block.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e47e6ada-1fbc-4533-9cb1-fd1d7cdfd57a" id="sec.69" provision.type="other" spent.amends="0"><no>69</no><heading guid="_1a5a71ff-e2b3-4807-a540-a2858d7a1035" id="sec.69-he">Adjustment for particular potential commercial areas</heading><block><txt break.before="1">If the only way to comply with the relinquishment condition is to relinquish all or part of a potential commercial area for the authority, the relinquishment condition is taken to be complied with if all remaining sub-blocks of the original notional sub-blocks of the authority are relinquished.</txt></block></clause><clause affected.by.uncommenced="0" guid="_923f4942-7d2f-4a29-8f06-d0331a27fc9d" id="sec.70" provision.type="other" spent.amends="0"><no>70</no><heading guid="_5091bb4d-3730-4dbf-b593-b0a66e742b6a" id="sec.70-he">Relinquishment must be by blocks<ins xml:space="preserve"> or sub-blocks</ins></heading><subclause affected.by.uncommenced="0" change="insReplace" guid="_d60e093a-87d2-468f-a726-effe9ae426d5" id="sec.70-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A relinquishment under the relinquishment condition—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b43aba7e-cbfb-4f23-ba0b-c699917179ff" id="sec.70-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">may be by blocks or sub-blocks; and</txt></block></li><li guid="_029fa94f-7b0b-41ea-9454-2d382dee5a5a" id="sec.70-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">must be of at least 1 block.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" change="delReplace" guid="_293a7afc-80ba-474c-b688-f568f848770a-del" id="sec.70-ssec.1-del" provision.type="other"><no>(1)</no><block><txt break.before="0">A relinquishment under the relinquishment condition can only be by blocks.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_058830da-2920-48e2-a287-f710cdb36007" id="sec.70-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if a block contains an area that, under <intref check="valid" refid="sec.67" target.guid="_de5f1794-8afa-485f-b967-f7198ca6f8a1">section 67</intref>, can not be counted as a relinquishment, <intref check="valid" refid="sec.70-ssec.1" target.guid="_293a7afc-80ba-474c-b688-f568f848770a">subsection (1)</intref><ins xml:space="preserve">(b)</ins> is complied with if all of the rest of the land within the block is relinquished.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_9c8f86a6-3c47-435d-a9d8-05d0872c93e3" id="sec.71" provision.type="other" spent.amends="0"><no>71</no><heading guid="_1fc90f15-66ca-4abf-92fb-32e3f3748aa6" id="sec.71-he">Ending of authority to prospect if all of its area relinquished</heading><block><txt break.before="1">If all of the area of an authority to prospect is relinquished, the authority ends.</txt></block></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_f0699f8f-d227-4866-8976-28fbf5bf772c" id="ch.2-pt.1-div.4-sdiv.2A" numbering.style="manual"><no>Subdivision 2A</no><heading guid="_038aa9a4-f093-4647-92e0-d92d215a6218" id="ch.2-pt.1-div.4-sdiv.2A-he">Mandatory conditions for particular types of testing</heading><clause affected.by.uncommenced="0" guid="_4d4a223e-4703-4e99-a040-ab3ece73040e" id="sec.71A" provision.type="other" spent.amends="0"><no>71A</no><heading guid="_be41d8c3-7ff8-4ce6-a9cb-bd66885c5519" id="sec.71A-he">ATP production testing</heading><subclause affected.by.uncommenced="0" guid="_b2f249e6-f0bc-4090-8f5d-a0e073f34c2b" id="sec.71A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.72" target.guid="_1dc3e77e-66e6-4f75-a754-ead5135a5a28">section 72</intref>, an authority to prospect holder may carry out testing for petroleum production for a petroleum well (<defterm guid="_7dcbce78-e887-4e3e-8ece-86638efcdb98" id="sec.71A-def.ATPproductiontesting" type="definition">ATP production testing</defterm>) within the area of the authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b1b26e6b-a627-4bc2-ab8b-75aa02b89004" id="sec.71A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, it is a condition of the authority to prospect that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_221fa1d2-bcdf-4f82-a378-5ffdd8b4a38a" id="sec.71A-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the holder gives the chief executive a notice, containing the information prescribed by regulation, in relation to the ATP production testing within 20 business days after the testing starts; and</txt></block></li><li guid="_05d59741-146a-47d6-b2c6-1f8cc5ef080b" id="sec.71A-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the testing is carried out after the end date for the testing only with the Minister’s approval.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_96f94324-02af-45cc-8c43-042bad2c03d5" id="sec.71A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister may, at any time, approve the carrying out after the end date for ATP production testing (the <defterm guid="_60ad08bd-5fab-4583-b7cd-13915126b707" id="sec.71A-def.originalATPproductiontesting" type="definition">original ATP production testing</defterm>) of further ATP production testing and the approval is subject to the conditions the Minister considers appropriate.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b0897c3c-9355-46fc-90ff-e28fc9b39453" id="sec.71A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the Minister decides not to approve the carrying out of further ATP production testing, the Minister must give the authority to prospect holder an information notice about the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_01de1f46-50df-428a-a2ea-6a79bb7e8c08" id="sec.71B" provision.type="other" spent.amends="0"><no>71B</no><heading guid="_dd7b4305-7c82-4f45-822c-79c12a650e64" id="sec.71B-he">ATP storage testing</heading><subclause affected.by.uncommenced="0" guid="_b2de4557-850f-4ef3-983d-8b4af89f443f" id="sec.71B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.72" target.guid="_1dc3e77e-66e6-4f75-a754-ead5135a5a28">section 72</intref>, an authority to prospect holder may carry out testing for the storage of petroleum or a prescribed storage gas in a natural underground reservoir (<defterm guid="_0d70ab3e-b28e-4121-8f00-c1047b7a6beb" id="sec.71B-def.ATPstoragetesting" type="definition">ATP storage testing</defterm>) within the area of the authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_756487c7-1285-4087-aaee-f2426d597882" id="sec.71B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, it is a condition of the authority to prospect that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0184985d-5260-4def-8bea-d094d1764c6f" id="sec.71B-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the holder gives the chief executive a notice, containing the information prescribed by regulation, in relation to the ATP storage testing within 20 business days after the testing starts; and</txt></block></li><li guid="_4b59a12f-f5a5-4775-b9a8-e7c2741405f2" id="sec.71B-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the testing is carried out after the end date for the testing only with the Minister’s approval.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1fa7ffda-f75a-451a-a89d-4535dafe0bc6" id="sec.71B-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.71B-ssec.4" target.guid="_7e181b94-569e-4590-aaa6-9836e3f53c38">subsection (4)</intref>, the Minister may, at any time, approve the carrying out after the end date for ATP storage testing (the <defterm guid="_b17062d9-1e13-460b-a1ce-353e7ccf3ea8" id="sec.71B-def.originalATPstoragetesting" type="definition">original ATP storage testing</defterm>) of further ATP storage testing and the approval is subject to the conditions the Minister considers appropriate.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7e181b94-569e-4590-aaa6-9836e3f53c38" id="sec.71B-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">An approval may not be given under <intref check="valid" refid="sec.71B-ssec.3" target.guid="_1fa7ffda-f75a-451a-a89d-4535dafe0bc6">subsection (3)</intref> more than 1 day before the end date for the original ATP storage testing.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3877696d-e2c4-454b-97ef-c426d28731fc" id="sec.71B-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the Minister decides not to approve the carrying out of further ATP storage testing, the Minister must give the authority to prospect holder an information notice about the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d27fa573-e06b-4026-8d7b-bf0928f58e2d" id="sec.71B-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">Despite <intref check="valid" refid="sec.71B-ssec.1" target.guid="_b2de4557-850f-4ef3-983d-8b4af89f443f">subsections (1)</intref> to <intref check="valid" refid="sec.71B-ssec.3" target.guid="_1fa7ffda-f75a-451a-a89d-4535dafe0bc6">(3)</intref>, an authority to prospect holder must not carry out GHG stream storage.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e831a8b3-61ca-464f-b8c3-636c62a94798" id="sec.71C" provision.type="other" spent.amends="0"><no>71C</no><heading guid="_9f1d0fd6-7159-4d65-a178-2eb6e1df8964" id="sec.71C-he">Authority to prospect holder must notify chief executive if testing stops</heading><block><txt break.before="1">If an authority to prospect holder stops carrying out any ATP production testing or ATP storage testing within the area of the authority for a continuous period of 14 days or more, the holder must give the chief executive a notice, containing the information prescribed by regulation, in relation to the testing within 20 business days after the testing stops.</txt></block></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_6f1fa261-2d7b-4e04-9da1-ba78824a23de" id="ch.2-pt.1-div.4-sdiv.3"><no>Subdivision 3</no><heading guid="_7ab2cb84-6fdd-438b-8007-37248dd469e7" id="ch.2-pt.1-div.4-sdiv.3-he">Other mandatory conditions</heading><clause affected.by.uncommenced="0" guid="_1dc3e77e-66e6-4f75-a754-ead5135a5a28" id="sec.72" provision.type="other" spent.amends="0"><no>72</no><heading guid="_59cc50e5-e1af-4ee5-a929-e8eb83d490cf" id="sec.72-he">Restriction on flaring or venting</heading><subclause affected.by.uncommenced="0" guid="_00a6aa64-9cbf-43be-90f1-65a90e61ab38" id="sec.72-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An authority to prospect holder must not flare or vent petroleum in a gaseous state produced under the authority unless the flaring or venting is authorised under this section.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4a2a6575-52c1-4a3a-a40c-32e4bbc2adbf" id="sec.72-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Flaring the gas is authorised if it is not commercially or technically feasible to use it—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bd72d6c9-eec0-430e-875c-f31275eec4a8" id="sec.72-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">commercially under the authority; or</txt></block></li><li guid="_87d4b504-ea22-4a90-8926-05c4ef118a07" id="sec.72-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for an authorised activity for the authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ed39d9c4-de82-4e6a-94a1-b49f68a380ec" id="sec.72-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Venting the gas is authorised if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7b52151d-764b-4534-9172-20625d94e7b7" id="sec.72-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">it is not safe to use the gas for a purpose mentioned in <intref check="valid" refid="sec.72-ssec.2" target.guid="_4a2a6575-52c1-4a3a-a40c-32e4bbc2adbf">subsection (2)</intref><intref check="valid" refid="sec.72-ssec.2-para1.a" target.guid="_bd72d6c9-eec0-430e-875c-f31275eec4a8">(a)</intref> or <intref check="valid" refid="sec.72-ssec.2-para1.b" target.guid="_87d4b504-ea22-4a90-8926-05c4ef118a07">(b)</intref> or to flare it; or</txt></block></li><li guid="_a40b228a-a8d8-4dc2-a7eb-0af174203e64" id="sec.72-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">flaring it is not technically practicable.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_6ab40f03-4ffa-427f-95df-397de0f9a266" id="sec.75" provision.type="other" spent.amends="0"><no>75</no><heading guid="_4ef5d1b3-e027-4435-8c07-e5277b87ec9a" id="sec.75-he">Petroleum royalty and annual rent</heading><subclause affected.by.uncommenced="0" guid="_af6919df-245a-4810-b2fc-d70650b7dbcc" id="sec.75-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An authority to prospect holder must pay the State—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9775dd82-8820-425a-a3de-fa72055a20da" id="sec.75-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">petroleum royalty as required under <intref check="valid" refid="ch.6" target.guid="_1179c65a-355e-4281-a616-c3e83927d1e4">chapter 6</intref>; and</txt></block></li><li guid="_c3ddc4db-748f-4619-bb2f-1ccff775cf62" id="sec.75-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the annual rent, as prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_88cac99b-17e5-4747-9c8b-895b52e4dc42" id="sec.75-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The annual rent must be paid in the way, and on or before the day, prescribed under a regulation.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_49036447-7074-4ab0-9fa1-1e6df0025604" id="sec.76" provision.type="other" spent.amends="0"><no>76</no><heading guid="_4b784231-cc1f-4c54-b4d6-2f0332ed3d4c" id="sec.76-he">Civil penalty for nonpayment of annual rent</heading><subclause affected.by.uncommenced="0" guid="_18bf467a-a325-427d-a03b-ca3dc6783f0b" id="sec.76-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If an authority to prospect holder does not pay the annual rent as required under <intref check="valid" refid="sec.75" target.guid="_6ab40f03-4ffa-427f-95df-397de0f9a266">section 75</intref>, the holder must also pay the State a civil penalty.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_160d4480-4503-4701-b787-5e32415cf364" id="sec.76-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The amount of the penalty is 15% of the rent.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3c568638-50c1-457a-bb0b-32fed7c95564" id="sec.76-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The penalty—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_05db0577-e2ab-43eb-be5d-a2d1954837ce" id="sec.76-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must be paid on the day after the last day for payment of the rent; and</txt></block></li><li guid="_08a1149a-7b47-4067-a0a1-429a02215a2d" id="sec.76-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is still payable even if the holder later pays the rent.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1d23266e-ad42-4b17-9b04-3c4bcbbadc43" id="sec.77" provision.type="other" spent.amends="0"><no>77</no><heading guid="_55157b95-f444-46f6-96dd-38651cb28673" id="sec.77-he">Requirement to have work program</heading><block><txt break.before="1">The holder of an authority to prospect must have a work program for the authority.</txt><note guid="_eb0125ab-7c1d-460a-8f0c-8dad38516cb0" id="sec.77-note" type="example"><heading guid="_d689fb11-78e3-4579-b485-4b9d1da7817b" id="sec.77-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_2f38ac10-1131-4dd8-9a35-67cb1e6a7663" id="sec.77-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">The only work program for an authority to prospect is its current initial or later work program, as approved under <intref check="valid" refid="ch.2-pt.1-div.3" target.guid="_68a7a1d9-c152-465c-9d27-7eebd1ad4060">division 3</intref>.</txt></block></li><li guid="_3b2ebdf3-bf60-4298-a681-08d37eb0b430" id="sec.77-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">For the requirements to lodge a proposed later work program see <intref check="valid" refid="sec.79" target.guid="_4d70b3fa-ec85-47d0-8263-be87e6884f18">sections 79</intref>, <intref check="valid" refid="sec.100" target.guid="_5aa886d4-cfc8-4f39-96cd-b320c5c6ffce">100</intref>, <intref check="valid" refid="sec.104" target.guid="_505d1bab-1a07-4b29-be47-c730c5acf46c">104</intref>, <intref check="valid" refid="sec.372" target.guid="_ca69f628-3c9d-4326-827f-8e1640ad6c55">372</intref> and <intref check="valid" refid="sec.790" target.guid="_0ae40873-0f6d-4440-a74c-a02fa5649d4f">790</intref>.</txt></block></li><li guid="_bf7b2b56-1870-4eee-b023-e6dc1a0da757" id="sec.77-note-para1.3" provision.type="other"><no>3</no><block><txt break.before="0">For approval of proposed later work programs see <intref check="valid" refid="ch.2-pt.1-div.3" target.guid="_68a7a1d9-c152-465c-9d27-7eebd1ad4060">division 3</intref>, <intref check="valid" refid="ch.2-pt.1-div.3-sdiv.5" target.guid="_5472fe14-7806-4e7a-a3dd-bb38c4b35e8d">subdivision 5</intref>.</txt></block></li></list></block></note></block></clause><clause affected.by.uncommenced="0" change="insReplace" guid="_2e2b11ab-74c7-4810-8156-2bc41d7fb427" id="sec.78" provision.type="other" spent.amends="0"><no>78</no><heading guid="_b303b185-6f85-403c-a344-b6e14df61add" id="sec.78-he">Compliance with work program</heading><block><txt break.before="1">The holder of an authority to prospect must comply with the work program for the authority.</txt></block></clause><clause affected.by.uncommenced="0" change="delReplace" guid="_2b68729d-6709-4fae-a178-9da314d26458-del" id="sec.78-del" provision.type="other" spent.amends="0"><no>78</no><heading guid="_a84083e3-f1b4-463b-a86c-921f3e27c2ef-del" id="sec.78-he-del">Compliance with exploration activities in work program</heading><block><txt break.before="1">An authority to prospect holder must carry out the exploration activities proposed in the work program.</txt><note guid="_82bdd854-a5c0-4751-852d-5805b8cd2740-del" id="sec.78-note-del" type="example"><heading guid="_01e5058d-eb98-4a94-88f5-8a7c8ffdfd03-del" id="sec.78-note-he-del">Note—</heading><block><txt break.before="1">For the minimum work commitment, see <intref check="valid" refid="sec.48" target.guid="_2acbbd92-93d8-4a20-88c6-4a2e0ee891d7">section 48</intref><intref check="valid" refid="sec.48-ssec.1" target.guid="_dcbdf097-6be7-49e7-a1dd-534676429892">(1)</intref><intref check="valid" refid="sec.48-ssec.1-para1.b" target.guid="_b524666f-ee8f-4743-a0d0-891ee444a115">(b)</intref><intref check="valid" refid="sec.48-ssec.1-para1.b-para2.i" target.guid="_ec271654-8569-4fc2-8102-b7870b85e446">(i)</intref>.</txt></block><block><txt break.before="1">See also <intref check="valid" refid="sec.56" target.guid="_793152c0-0621-47cd-b9d7-26d582e343d1">section 56</intref> (Authority taken to have work program until decision on whether to approve proposed work program).</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_6279e9f1-bc94-4aea-955c-4937391f60d0" id="sec.78A" provision.type="other" spent.amends="0"><no>78A</no><heading guid="_3741ab50-d920-44bf-80c9-59b462ec9515" id="sec.78A-he">Penalty relinquishment if work program not completed within extended period</heading><subclause affected.by.uncommenced="0" guid="_f5926657-7c99-4b86-b2f6-2c12bfc937d5" id="sec.78A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1791ee57-e473-4670-9c14-e9279edc972c" id="sec.78A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">under <intref check="valid" refid="ch.2-pt.1-div.3" target.guid="_68a7a1d9-c152-465c-9d27-7eebd1ad4060">division 3</intref>, <intref check="valid" refid="ch.2-pt.1-div.3-sdiv.6" target.guid="_32b497cb-19b1-442c-975a-0c9ddae56156">subdivision 6</intref>, the period of the work program for an authority to prospect has been extended; and</txt></block></li><li guid="_fadad43f-6c4e-4a75-a342-b8231c0fd945" id="sec.78A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the work program is not completed on or before the day on which the extended period ends;</txt></block></li></list></block><block><txt break.before="1">its holder must relinquish a part of the original notional sub-blocks of the authority that the Minister is satisfied corresponds to the amount of the work under the work program that was not completed.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a7910a39-6212-4c90-9704-9ddbdf212320" id="sec.78A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The holder must give the chief executive written notice of the relinquishment within 20 business days after the end of the extended period.</txt><note guid="_66fa546a-99ee-464f-a90a-0d1cfdeb0676" id="sec.78A-ssec.2-note" type="example"><heading guid="_2741e2ff-56d1-4a81-a95b-a2e0d4726952" id="sec.78A-ssec.2-note-he">Note—</heading><block><txt break.before="1">For other relevant provisions about giving a document to the chief executive, see <intref check="valid" refid="sec.851AA" target.guid="_1bb215c0-29c7-436b-85d1-d8220a60416c">section 851AA</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_1ce27d4d-3f09-4abf-958b-8e55f7d5e2fc" id="sec.78A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the holder does not comply with <intref check="valid" refid="sec.78A-ssec.2" target.guid="_a7910a39-6212-4c90-9704-9ddbdf212320">subsection (2)</intref>, the Minister may take action under <intref check="valid" refid="sec.790" target.guid="_0ae40873-0f6d-4440-a74c-a02fa5649d4f">section 790</intref><intref check="valid" refid="sec.790-ssec.1" target.guid="_e5b16464-3b1b-49f2-9d8e-3b9d7c76d4ad">(1)</intref><intref check="valid" refid="sec.790-ssec.1-para1.b" target.guid="_be540110-8922-4c58-9559-fa56156b036c">(b)</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_4d70b3fa-ec85-47d0-8263-be87e6884f18" id="sec.79" provision.type="other" spent.amends="0"><no>79</no><heading guid="_3f9e6752-e85b-4785-9eff-23ddc72d745e" id="sec.79-he">Obligation to lodge proposed later work program</heading><subclause affected.by.uncommenced="0" guid="_94af6cdb-0c76-4785-99c9-728ed5d5d0be" id="sec.79-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section imposes an obligation on an authority to prospect holder to lodge a proposed later work program for the authority.</txt><note guid="_91f5c3cd-baee-4f73-ae3d-9040fdd67059" id="sec.79-ssec.1-note" type="example"><heading guid="_37bb264a-fe8c-43c6-a257-bf42e895b511" id="sec.79-ssec.1-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_27215074-7ed0-4a1a-89b6-5d8536abf81f" id="sec.79-ssec.1-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">For approval of the proposed program, see <intref check="valid" refid="ch.2-pt.1-div.3" target.guid="_68a7a1d9-c152-465c-9d27-7eebd1ad4060">division 3</intref>, <intref check="valid" refid="ch.2-pt.1-div.3-sdiv.5" target.guid="_5472fe14-7806-4e7a-a3dd-bb38c4b35e8d">subdivision 5</intref>.</txt></block></li><li guid="_e6a05775-9950-4a1d-843f-36f2e4c0a93f" id="sec.79-ssec.1-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">If the holder wishes to renew the authority, a proposed later work program must be included in the renewal application. See <intref check="valid" refid="sec.82" target.guid="_290eb260-2342-4e89-904e-70db62d0f694">section 82</intref><intref check="valid" refid="sec.82-ssec.1" target.guid="_60b93684-44cd-40cf-8fd6-049c2db27914">(1)</intref>.</txt></block></li></list></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_b252d53c-6b74-4ee1-aa3e-580d6b61a24b" id="sec.79-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The obligation is complied with only if the proposed later work program—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f0f5b940-ed7b-4700-802c-b191e1149a9f" id="sec.79-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is lodged; and</txt></block></li><li guid="_fc87c4bd-cb7d-4ced-a824-5ee94f11ae4f" id="sec.79-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">complies with the later work program requirements; and</txt></block></li><li guid="_3f5f31fa-65de-4779-ae55-0afdfe1b8395" id="sec.79-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">is accompanied by the relevant fee.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7e2c96ab-d92a-4d39-9179-b0cc2b3c14ba" id="sec.79-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A proposed later work program must be lodged at least 40, but no more than 100, business days before the end of the program period for the current work program for the authority (the <defterm guid="_05a66c63-9491-4b75-830b-b1604270fc87" id="sec.79-def.currentworkprogramperiod" type="definition">current work program period</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a9dbd616-a5cf-414d-ba6a-98e6643b747d" id="sec.79-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, if before the end of the current work program period, a decision is made not to approve a proposed later work program lodged under <intref check="valid" refid="sec.79-ssec.3" target.guid="_7e2c96ab-d92a-4d39-9179-b0cc2b3c14ba">subsection (3)</intref>, the holder may, within the eligible balance of the period, lodge another proposed later work program.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_de3cdb32-5ce4-40ac-a993-244acfbafd11" id="sec.79-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the holder does not lodge any proposed later work program before the end of the current work program period or if <intref check="valid" refid="sec.79-ssec.4" target.guid="_a9dbd616-a5cf-414d-ba6a-98e6643b747d">subsection (4)</intref> applies and the holder does not lodge another proposed later work program within the eligible balance of the current work program period—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_223ac85b-e304-4bd0-b4c1-e13819f96113" id="sec.79-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the holder must be given a notice requiring the holder to lodge a proposed later work program for the authority within 40 business days after the giving of the notice; and</txt></block></li><li guid="_272e29ef-4dcb-4984-a735-fe537bc61d28" id="sec.79-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder must comply with the requirement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a8c74f10-4e81-474a-b9f6-4da35573f6a2" id="sec.79-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_1b83eba7-0c69-4cb7-8aa9-80af55b84b32" id="sec.79-ssec.6-def.eligiblebalance_"><txt break.before="1"><defterm guid="_ea37c03b-44af-47fa-b215-d19c8db18800" id="sec.79-ssec.6-def.eligiblebalance" type="definition">eligible balance</defterm>, for a current work program period during which a decision mentioned in <intref check="valid" refid="sec.79-ssec.4" target.guid="_a9dbd616-a5cf-414d-ba6a-98e6643b747d">subsection (4)</intref> is made, means the balance of the period, other than the appeal period for the decision.</txt></definition><definition affected.by.uncommenced="0" guid="_33b9de4e-593a-475b-a11a-54a076c5366f" id="sec.79-ssec.6-def.relevantfee_"><txt break.before="1"><defterm guid="_54af0068-466e-45fe-b556-45f92219e68b" id="sec.79-ssec.6-def.relevantfee" type="definition">relevant fee</defterm>, for the lodgement of the proposed program, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b0d69a5f-65bf-4bb1-9a96-b113b88a8458" id="sec.79-ssec.6-def.relevantfee-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the proposed program is lodged within the time required under <intref check="valid" refid="sec.79-ssec.3" target.guid="_7e2c96ab-d92a-4d39-9179-b0cc2b3c14ba">subsection (3)</intref>—the fee prescribed under a regulation; or</txt></block></li><li guid="_6078fe6c-b64e-4c91-984b-76e4d90570d7" id="sec.79-ssec.6-def.relevantfee-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the proposed program is lodged after the time required under <intref check="valid" refid="sec.79-ssec.3" target.guid="_7e2c96ab-d92a-4d39-9179-b0cc2b3c14ba">subsection (3)</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_30606d1a-b783-480d-9cf0-b2d5ca2871f4" id="sec.79-ssec.6-def.relevantfee-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">if it is lodged under <intref check="valid" refid="sec.79-ssec.4" target.guid="_a9dbd616-a5cf-414d-ba6a-98e6643b747d">subsection (4)</intref>—nil; or</txt></block></li><li guid="_f70b29d5-ae67-4bfc-9b79-a4cd4900135d" id="sec.79-ssec.6-def.relevantfee-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if it is not lodged under <intref check="valid" refid="sec.79-ssec.4" target.guid="_a9dbd616-a5cf-414d-ba6a-98e6643b747d">subsection (4)</intref>—an amount that is 10 times the prescribed fee.</txt></block></li></list></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_6796563f-634a-4cd3-85fb-ad84fdb31946" id="sec.80" provision.type="other" spent.amends="0"><no>80</no><heading guid="_8d5da709-cba2-4016-bfe1-eba1afb82a50" id="sec.80-he">Consequence of failure to comply with notice to lodge proposed later work program</heading><subclause affected.by.uncommenced="0" guid="_a00ff98b-1334-4cf3-b69c-f3cbe9154e9f" id="sec.80-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If an authority to prospect holder does not comply with a requirement under <intref check="valid" refid="sec.79" target.guid="_4d70b3fa-ec85-47d0-8263-be87e6884f18">section 79</intref><intref check="valid" refid="sec.79-ssec.5" target.guid="_de3cdb32-5ce4-40ac-a993-244acfbafd11">(5)</intref><intref check="valid" refid="sec.79-ssec.5-para1.a" target.guid="_223ac85b-e304-4bd0-b4c1-e13819f96113">(a)</intref>, the authority is cancelled.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_deaf106c-1bb1-4fe9-8003-0405aacd3aaf" id="sec.80-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the cancellation does not take effect until the holder is given a notice stating that the authority has been cancelled because of the operation of <intref check="valid" refid="sec.80-ssec.1" target.guid="_a00ff98b-1334-4cf3-b69c-f3cbe9154e9f">subsection (1)</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_f4c9e77c-6813-4e37-887c-3df1844ba6e1" id="sec.80A" provision.type="other" spent.amends="0"><no>80A </no><heading guid="_054530a8-0283-4a21-ad6f-46a34021975c" id="sec.80A-he">Power to impose or amend condition if changed holder of authority to prospect</heading><subclause affected.by.uncommenced="0" guid="_5534ed8a-89ed-4b96-8a2d-1c08891945db" id="sec.80A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if 1 of the following changes happens—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2f721f4e-ab55-4631-bf9c-407a1c367f71" id="sec.80A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an entity starts or stops controlling the holder of an authority to prospect under the Corporations Act, section 50AA; </txt></block></li><li guid="_eb5e18ac-7cd7-4255-8777-598bce706a42" id="sec.80A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder of an authority to prospect starts or stops being a subsidiary of a corporation under the Corporations Act, section 46.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c16a9f42-ca21-4086-843c-562bbcc5a2ee" id="sec.80A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister may consider whether, after the change, the holder of the authority to prospect has the financial and technical resources to comply with the conditions of the authority to prospect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9b762290-bba9-4e21-80b5-4c2b59bafe7d" id="sec.80A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the Minister considers the holder of the authority to prospect may not have the financial and technical resources to comply with conditions of the authority to prospect, the Minister may impose another condition on, or amend a condition of, the authority to prospect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_12cc9ae6-efdf-409a-b3f3-1934c283ef5f" id="sec.80A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the Minister believes a change mentioned in subsection (1) may have happened, the Minister may require the holder of the authority to prospect to give the Minister information or a document about whether or not the change has happened.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c8953777-185f-45b0-ab19-92ea09097ed8" id="sec.80A-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Before deciding to impose another condition on, or amend a condition of, the authority to prospect under subsection (3), the Minister may require the holder of the authority to prospect to give the Minister information or a document the Minister requires to make the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3e745603-53b2-4553-916d-1e689af23835" id="sec.80A-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">A requirement under subsection (4) or (5) must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cfa0565b-0e82-4cb5-b02c-ca48ac6ee0e6" id="sec.80A-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be made by notice given to the holder; and</txt></block></li><li guid="_bcf200c9-a654-4559-b5b4-1105eedd0a18" id="sec.80A-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state a period of at least 10 business days within which the holder must comply with the requirement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2ee7e5d3-88b4-49ca-8f82-b691a4410a06" id="sec.80A-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">Before deciding to impose another condition on, or amend a condition of, the authority to prospect under subsection (3), the Minister must give the holder of the authority a notice stating—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c6136a90-cf8c-48fe-9735-4fd7c9ea5d7d" id="sec.80A-ssec.7-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the proposed decision; and</txt></block></li><li guid="_bec53f99-7df2-4b1f-830a-272be388ebb2" id="sec.80A-ssec.7-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the reasons for the proposed decision; and</txt></block></li><li guid="_03856477-f7ee-4a4d-890e-3515512bea4c" id="sec.80A-ssec.7-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that the holder may, within 10 business days after the notice is given, make submissions to the Minister about the proposed decision.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6a206770-e811-45a3-b024-84a16dabea9e" id="sec.80A-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">The Minister may extend the period mentioned in subsection (6)(b) or (7)(c) by notice given to the holder of the authority to prospect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_003200fd-c9ea-4ed2-b253-46000dcf4850" id="sec.80A-ssec.9" provision.type="other"><no>(9)</no><block><txt break.before="0">In deciding whether to impose another condition on, or amend a condition of, the authority to prospect under subsection (3), the Minister—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4d4ab74b-24d8-4155-bcc5-9c95dc64dd27" id="sec.80A-ssec.9-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must consider information or a document, if any, given under subsection (6)(b) or (7)(c); and</txt></block></li><li guid="_d24b675a-1471-46b6-971a-431a4157cbdc" id="sec.80A-ssec.9-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">may consider any other matter the Minister considers relevant.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_023fe8ba-4a95-426f-bade-4051221f4c69" id="sec.80A-ssec.10" provision.type="other"><no>(10)</no><block><txt break.before="0">If the Minister decides to impose another condition on, or amend a condition of, the authority to prospect under subsection (3), the Minister must, as soon as practicable after making the decision, give the holder a notice stating the decision and the reasons for the decision.</txt></block></subclause></clause></subdivision></division><division affected.by.uncommenced="0" guid="_f6cbb0fa-23b2-46ff-9a75-24356007235f" id="ch.2-pt.1-div.5"><no>Division 5</no><heading guid="_5310539b-dda3-4951-bf7e-05c010e50c49" id="ch.2-pt.1-div.5-he">Renewals</heading><clause affected.by.uncommenced="0" guid="_f2f17ea9-9bcd-4912-96f7-d2f93dc5f4f4" id="sec.81" provision.type="other" spent.amends="0"><no>81</no><heading guid="_feabb4d4-c428-40e6-b8ff-3cddc63930de" id="sec.81-he">Conditions for renewal application</heading><subclause affected.by.uncommenced="0" guid="_8d2bbba8-6066-4aa7-a00e-adb184facb03" id="sec.81-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An authority to prospect holder may apply to renew the authority only if none of the following is outstanding—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0728685a-7240-4bd7-8c26-08fa0aecc406" id="sec.81-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">annual rent for the authority;</txt></block></li><li guid="_159ab598-e0a6-4e65-9a0a-77101925ecd2" id="sec.81-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a civil penalty under <intref check="valid" refid="sec.76" target.guid="_49036447-7074-4ab0-9fa1-1e6df0025604">section 76</intref> for nonpayment of annual rent;</txt></block></li><li guid="_53d3a253-b451-42d2-92de-4b254a75318f" id="sec.81-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">interest payable under <intref check="valid" refid="sec.588" target.guid="_a4bc919c-7264-46d2-bbaa-0d47579c4e14">section 588</intref> on annual rent or a civil penalty;</txt></block></li><li guid="_2dfa990f-3e9c-4a63-bfd1-4358dddb2bde" id="sec.81-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a royalty-related amount payable by the holder;</txt></block></li><li guid="_00d3e112-3876-479b-aff7-414ae9b9efc6" id="sec.81-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">security required for the authority, as required under <intref check="valid" refid="sec.488" target.guid="_13f8de44-15a4-4a47-a9af-6464bc374dda">section 488</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d7e1ca0b-ec9f-4daa-8595-200f0ff1b9c2" id="sec.81-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Also, the application can not be made—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0ee704bb-2edf-40c7-a971-28e5d93160e6" id="sec.81-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">more than 60 business days before the end of the term of the authority; or</txt></block></li><li guid="_9cffe5a4-45a9-49fb-bb68-52db3774e824" id="sec.81-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">after the authority has ended.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_290eb260-2342-4e89-904e-70db62d0f694" id="sec.82" provision.type="other" spent.amends="0"><no>82</no><heading guid="_893297b0-e86b-4a7e-ad2f-1bb29c85e80e" id="sec.82-he">Requirements for making application</heading><subclause affected.by.uncommenced="0" guid="_60b93684-44cd-40cf-8fd6-049c2db27914" id="sec.82-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The application must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c57c1dc6-60b0-4e8f-ae14-c1bfd7f04952" id="sec.82-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li guid="_3a75f5b3-0c6d-414f-ae11-6b11e663e8f0" id="sec.82-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state whether or not the work program for the authority to prospect has been complied with; and</txt></block></li><li guid="_43630e04-9b5f-4211-bfcc-792c02e2cfc0" id="sec.82-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the work program has not been complied with—state details of, and the reasons for, each noncompliance; and</txt></block></li><li guid="_990ca64a-34b9-495d-add8-26b7e75939f3" id="sec.82-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">include a proposed later work program for the renewed authority; and</txt></block></li><li guid="_d054d5e1-31bf-434f-8ce3-9cf9f265aef2" id="sec.82-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">address the capability criteria; and</txt></block></li><li guid="_3658065b-efeb-4ef2-a02e-80fc8591c378" id="sec.82-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">include information about the matters that, under <intref check="valid" refid="sec.84" target.guid="_d8cacd4e-85d8-4a5a-9dd1-2c3fb6665cad">sections 84</intref> and <intref check="valid" refid="sec.86" target.guid="_2e320899-8a2a-4b18-9f28-85e9f403431a">86</intref>, must or may be considered in deciding the application; and</txt></block></li><li guid="_70257490-49a9-402b-b1a7-b239b4d5e32d" id="sec.82-ssec.1-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">state whether or not the applicant has complied with <intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref>, <intref check="valid" refid="ch.5-pt.7" target.guid="_01d524f3-ca84-4e41-ab48-d8ec12875570">part 7</intref>, for reports required to be lodged in relation to the authority; and</txt></block></li><li guid="_e50cf7a3-1d9c-4da2-8b31-d70168670ac1" id="sec.82-ssec.1-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">be accompanied by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0d1a0a83-07c2-4718-82b7-cb4b2b81f798" id="sec.82-ssec.1-para1.h-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the application fee prescribed under a regulation; and</txt></block></li><li guid="_f3d95a6d-f136-4bc4-887d-9a83ec298c4b" id="sec.82-ssec.1-para1.h-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the application is made less than 20 business days before end of the term of the authority—an amount that is 10 times the application fee.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_199992db-0822-43e0-870a-53b524ff5f8f" id="sec.82-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The proposed work program must comply with the later work program requirements.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_02ef8ff2-7f1b-4587-8d95-b927297c592e" id="sec.83" provision.type="other" spent.amends="0"><no>83</no><heading guid="_56b9eacd-2de2-48b7-a3f8-7f1afcc04712" id="sec.83-he">Continuing effect of authority for renewal application</heading><subclause affected.by.uncommenced="0" guid="_f01a1379-7c1b-40c6-874a-3a6f09fa4bbe" id="sec.83-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if before the application is decided the term of the authority to prospect ends.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_edfe3d6a-c1d3-49fa-9551-8127c1584008" id="sec.83-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite the ending of the term, the authority continues in force until the earlier of the following to happen—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_aad390d1-c2f9-4fc8-a564-340d57dea718" id="sec.83-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the start of any renewed term of the authority;</txt></block></li><li guid="_c2ee2280-fd1a-4224-be1e-b20366c9e470" id="sec.83-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a refusal of the application takes effect;</txt></block></li><li guid="_d2b81fe1-c5b5-488c-9d34-f3115d499768" id="sec.83-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the application is withdrawn;</txt></block></li><li guid="_66487cb3-88f4-4edf-a626-4677bb07a45e" id="sec.83-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the authority is cancelled under this Act.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_63e16790-49b3-4856-9fac-05f7bed07cf5" id="sec.83-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, if the applicant has applied for a declaration of a potential commercial area for the authority, the authority continues in force until the declaration application is decided, but only in relation to the area of the proposed potential commercial area applied for.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4e454389-e706-418b-b3f7-afcead00c927" id="sec.83-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the authority is continued in force under <intref check="valid" refid="sec.83-ssec.3" target.guid="_63e16790-49b3-4856-9fac-05f7bed07cf5">subsection (3)</intref>, the evaluation program included in the declaration application is taken to be the work program for the authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_16932c17-e898-435f-9a22-a2ea0794dd2e" id="sec.83-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the authority is renewed, <intref check="valid" refid="sec.83-ssec.2" target.guid="_edfe3d6a-c1d3-49fa-9551-8127c1584008">subsections (2)</intref> and <intref check="valid" refid="sec.83-ssec.3" target.guid="_63e16790-49b3-4856-9fac-05f7bed07cf5">(3)</intref> are taken never to have applied for the period from the end of the term of the authority being renewed, as stated in that authority.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d8cacd4e-85d8-4a5a-9dd1-2c3fb6665cad" id="sec.84" provision.type="other" spent.amends="0"><no>84</no><heading guid="_27718573-4382-4248-ad4f-994571ff0506" id="sec.84-he">Deciding application</heading><subclause affected.by.uncommenced="0" guid="_aff2d44b-519b-4d3e-893d-fcfd604da168" id="sec.84-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may grant or refuse the renewal.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ebad90f1-ed3e-47d5-93d2-9167935568d6" id="sec.84-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_be83f638-8002-439c-b5c7-119ae85e3a5a" id="sec.84-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before deciding to grant the renewal, the Minister must decide whether to approve the applicant’s proposed later work program for the renewed authority to prospect; and</txt></block></li><li guid="_c05537a1-d682-4096-b70e-3e18810974d6" id="sec.84-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the renewal can not be granted unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4defe379-d4dc-4e8b-a9e3-d768562b9e08" id="sec.84-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the proposed program has been approved; and</txt></block></li><li guid="_fed8f83f-9ad4-4b80-96e5-dbc9bf4d19cc" id="sec.84-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the applicant satisfies the capability criteria; and</txt></block></li><li guid="_b77def9d-85e1-4da9-bed3-892d132b06b1" id="sec.84-ssec.2-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the Minister is satisfied the applicant—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b616fafa-3aaa-42b3-97b9-c2272aa063f7" id="sec.84-ssec.2-para1.b-para2.iii-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">continues to satisfy any special criteria that applied for deciding the application for the authority to prospect being renewed; and</txt><note guid="_e98cd982-4144-4d91-bb3a-58d393cb276d-del" id="sec.84-ssec.2-para1.b-para2.iii-para3.A-note-del" type="example"><heading change="delReplace" guid="_dc480ec6-a97f-4dc3-956f-ea0d0a67386d-del" id="sec.84-ssec.2-para1.b-para2.iii-para3.A-note-he-del">Note—</heading><block><txt break.before="1"><del xml:space="preserve">See <intref check="valid" refid="sec.35" target.guid="_87b53d9f-6f6c-49a9-ad51-118aa252ae58">sections 35</intref><intref check="valid" refid="sec.35-ssec.2" target.guid="_120ae8b4-7377-489d-b475-e040e000f7e2">(2)</intref><intref check="valid" refid="sec.35-ssec.2-para1.e" target.guid="_d6918c74-54bf-4835-9756-6a2f38027506">(e)</intref><intref check="valid" refid="sec.35-ssec.2-para1.e-para2.iii" target.guid="_83d446d8-50bf-4b3c-b96b-81d1b73f0fad">(iii)</intref> (Call for tenders) and <intref check="valid" refid="sec.43" target.guid="_2c0b3e46-8914-4834-bfdb-7d2ff2248ba2">43</intref> (Criteria for decisions).</del></txt></block></note><note guid="_a8fa6791-0854-4c40-ba68-f598036392f9" id="sec.84-ssec.2-para1.b-para2.iii-para3.A-note" type="example"><heading change="insReplace" guid="_0c447ebf-469f-40dc-bdee-c369553d0b0e" id="sec.84-ssec.2-para1.b-para2.iii-para3.A-note-he">Note—</heading><block><txt break.before="1"><ins xml:space="preserve">See sections 35(2)(h)(iii) and 43.</ins></txt></block></note></block></li><li guid="_4c0c2631-4196-42ba-87f8-a0a99e9f8395" id="sec.84-ssec.2-para1.b-para2.iii-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">has substantially complied with the authority to prospect being renewed; and</txt></block></li></list></block></li><li guid="_00073d18-6aa3-4ea5-80a1-8c6c69a60fd4" id="sec.84-ssec.2-para1.b-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">a relevant environmental authority for the renewed authority to prospect has been issued.</txt></block></li></list></block></li></list><note guid="_673535b3-22cf-473b-bfcf-99ce0c9cc16d" id="sec.84-ssec.2-note" type="example"><heading guid="_1737cb23-a332-4402-9b6c-fd5e27983928" id="sec.84-ssec.2-note-he">Note—</heading><block><txt break.before="1">If the application relates to acquired land, see also <intref check="valid" refid="sec.30AC" target.guid="_9f663574-cdda-4e64-9f8f-6c6102041022">section 30AC</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_49451248-5ee5-4bde-82c0-e1ab012579d7" id="sec.84-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, if the applicant has been given a notice under <intref check="valid" refid="sec.96" target.guid="_0b09b268-b9f5-4054-80b3-b09455617421">section 96</intref> to apply for a petroleum lease, the application must not be decided until the issue of whether a petroleum lease will be granted is decided.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d156f746-af80-480a-ac9f-d6aba8d64870" id="sec.84-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0"><intref check="valid" refid="sec.84-ssec.3" target.guid="_49451248-5ee5-4bde-82c0-e1ab012579d7">Subsection (3)</intref> does not limit the power under <intref check="valid" refid="sec.97" target.guid="_f5b38cae-dc69-49cc-96eb-ea11271f2c4c">section 97</intref> to take a proposed action as stated in the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" change="ins" guid="_fa958fcf-bb15-40b7-8243-1ead3a4a9536" id="sec.84-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Subsection (6) applies if, after considering the proposed later work program mentioned in subsection (2)(a), the Minister considers a work program of another type mentioned in section 45(1) is more appropriate for the exploration of the area of the permit, if renewed.</txt></block></subclause><subclause affected.by.uncommenced="0" change="ins" guid="_e32204ca-a166-4242-8a39-0da6932c3b3f" id="sec.84-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">Before deciding the application, the Minister may, by written notice given to the applicant, require the applicant to give the Minister, within the reasonable period stated in the notice, a proposed work program of another type mentioned in section 45(1) for the further term of the permit, if renewed.</txt></block></subclause><subclause affected.by.uncommenced="0" change="renumber" guid="_33c7f2ff-601b-4bcc-a839-a69cf9e2cf46" id="sec.84-ssec.7" provision.type="other"><no>(<del xml:space="preserve">5</del><ins xml:space="preserve">7</ins>)</no><block><txt break.before="0">The Minister may, as a condition of deciding to grant the application, require the applicant to do all or any of the following within a stated reasonable period—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6123654c-64a8-4ee9-9fd4-922c9dfe753b" id="sec.84-ssec.7-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">pay the annual rent for the first year of the renewed authority;</txt></block></li><li guid="_88d5960f-6c65-4d20-9b82-d767aceab3ce" id="sec.84-ssec.7-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give, under <intref check="valid" refid="sec.488" target.guid="_13f8de44-15a4-4a47-a9af-6464bc374dda">section 488</intref>, security for the renewed authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" change="renumber" guid="_5024be91-29fa-4c57-96ef-6b7410511798" id="sec.84-ssec.8" provision.type="other"><no>(<del xml:space="preserve">6</del><ins xml:space="preserve">8</ins>)</no><block><txt break.before="0">If the applicant does not comply with the requirement, the application may be refused.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_023f553a-88c4-406b-83f3-4f1e559fb059" id="sec.85" provision.type="other" spent.amends="0"><no>85</no><heading guid="_7b38f432-e16b-490f-a7be-5f5dbff4e665" id="sec.85-he">Provisions and term of renewed authority</heading><subclause affected.by.uncommenced="0" guid="_30aefc26-e176-4fc8-a47c-57e1ecc8aa1a" id="sec.85-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Subject to this section, <intref check="valid" refid="sec.42" target.guid="_37ce7fc5-36f4-4382-9a31-d9859bb50de9">section 42</intref> applies to the renewed authority to prospect as if it were an authority to prospect granted under <intref check="valid" refid="ch.2-pt.1-div.2" target.guid="_a1146b5d-98c7-49a7-aa91-b3a012b06cc6">division 2</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6938e210-7af3-4c17-ac05-d925e24b459f" id="sec.85-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">To remove any doubt, it is declared that the conditions of the renewed authority may be different from the conditions or other provisions of the authority to prospect being renewed.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_670fdd14-bcb4-45ac-af7e-481489f2459d" id="sec.85-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The area of the renewed authority must not be more than the area of the authority to prospect being renewed immediately before the renewed authority is to take effect.</txt><note guid="_10060801-b1a2-403a-bee5-4f5d4af4922d" id="sec.85-ssec.3-note" type="example"><heading guid="_f5184cdd-b16a-4050-8212-5dfa67817335" id="sec.85-ssec.3-note-he">Note—</heading><block><txt break.before="1">See, however, <intref check="valid" refid="sec.30AC" target.guid="_9f663574-cdda-4e64-9f8f-6c6102041022">section 30AC</intref><intref check="valid" refid="sec.30AC-ssec.3" target.guid="_75f7d590-62c4-4ad0-89d9-66d823de1e55">(3)</intref> in relation to acquired land that was previously in the area of the authority to prospect being renewed.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" change="del" guid="_db5b95ee-2818-4205-9150-05e7b513116c-del" id="sec.85-ssec.4-del" provision.type="other"><no>(4)</no><block><txt break.before="0">The first relinquishment day for the renewed authority must not be later than 4 years after the day the renewed authority is to take effect.</txt></block></subclause><subclause affected.by.uncommenced="0" change="renumber" guid="_b3d93335-d1ee-428f-b2ef-fdc1be144685" id="sec.85-ssec.4" provision.type="other"><no>(<del xml:space="preserve">5</del><ins xml:space="preserve">4</ins>)</no><block><txt break.before="0">If the renewed authority is decided before the end of the term of the authority to prospect being renewed as stated in that authority (the <defterm guid="_bcf30ce4-9deb-4244-a7e1-f3dcc61f034e" id="sec.85-def.previousterm" type="definition">previous term</defterm>), the term of the renewed authority is taken to start from the end of the previous term.</txt></block></subclause><subclause affected.by.uncommenced="0" change="renumber" guid="_62b52253-531d-48bd-b90c-57eaaac0cfad" id="sec.85-ssec.5" provision.type="other"><no>(<del xml:space="preserve">6</del><ins xml:space="preserve">5</ins>)</no><block><txt break.before="0">If the renewed authority is decided after the previous term, the term of the renewed authority starts immediately after the end of the previous term, but—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8839b507-bdba-4fd1-82aa-c45248b490eb" id="sec.85-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the conditions of the renewed authority do not start until the authority holder is given notice of them; and</txt></block></li><li guid="_71990837-719f-4b23-9968-6e5fcc55ce66" id="sec.85-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">until the notice is given, the conditions of the authority to prospect being renewed apply to the renewed authority as if they were its conditions.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" change="renumber" guid="_e74bdf8f-b112-4a7f-a5e4-579c06f65617" id="sec.85-ssec.6" provision.type="other"><no>(<del xml:space="preserve">7</del><ins xml:space="preserve">6</ins>)</no><block><txt break.before="0">The term of the renewed authority must not end more than 12 years from when the authority to prospect originally took effect.</txt></block></subclause><subclause affected.by.uncommenced="0" change="renumber" guid="_f908f25e-9330-4248-804a-5a89e9ab3c55" id="sec.85-ssec.7" provision.type="other"><no>(<del xml:space="preserve">8</del><ins xml:space="preserve">7</ins>)</no><block><txt break.before="0">However, if any part of the area of the renewed authority is a potential commercial area, the term of the renewed authority for that part may be for a longer period that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_21b57060-9bb2-4483-b7ce-34caa740c111" id="sec.85-ssec.7-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">ends no later than when the declaration ends; and</txt></block></li><li guid="_bc7e978e-f66e-4ceb-a2f2-6b1d4d6ef987" id="sec.85-ssec.7-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is no more than the last term of the authority being renewed.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" change="renumber" guid="_b5a63722-9375-4629-9acc-f24a6b0cdb98" id="sec.85-ssec.8" provision.type="other"><no>(<del xml:space="preserve">9</del><ins xml:space="preserve">8</ins>)</no><block><txt break.before="0">To remove any doubt, it is declared that subsection (<del xml:space="preserve"><intref check="valid" refid="sec.85-ssec.8" target.guid="_f908f25e-9330-4248-804a-5a89e9ab3c55">8)(b) does not prevent a renewal of the renewed authority.</intref></del><ins xml:space="preserve">7)(b) does not prevent a renewal of the renewed authority.</ins></txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2e320899-8a2a-4b18-9f28-85e9f403431a" id="sec.86" provision.type="other" spent.amends="0"><no>86</no><heading guid="_90f57a38-9bb3-4e8e-ba51-8729173cd40a" id="sec.86-he">Criteria for decisions</heading><block><txt break.before="1">The matters that must be considered in deciding whether to grant the renewal or deciding the provisions of the renewed authority include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_adf56cc8-3aec-4d1a-bd2d-0fca96e6d3f6" id="sec.86-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the work program criteria; and</txt></block></li><li guid="_7fd6be32-e40c-4bfd-8ffb-08299b96a33d" id="sec.86-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether the applicant continues to satisfy the capability criteria and any special criteria.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_19284bb5-e28d-41d5-aafe-2c0e04439a34" id="sec.87" provision.type="other" spent.amends="0"><no>87</no><heading guid="_1774e26f-9d45-45ea-a036-a03dc0fc8e0e" id="sec.87-he">Information notice about refusal</heading><block><txt break.before="1">On refusal of the application, the applicant must be given an information notice about the decision to refuse.</txt></block></clause><clause affected.by.uncommenced="0" guid="_87de5741-2939-4c5a-9da4-1912908b45fb" id="sec.88" provision.type="other" spent.amends="0"><no>88</no><heading guid="_82716e92-126c-4991-bac8-2854f5b6bccf" id="sec.88-he">When refusal takes effect</heading><block><txt break.before="1">A refusal of the application does not take effect until end of the appeal period for the decision to refuse.</txt></block></clause></division><division affected.by.uncommenced="0" guid="_3f379027-68a0-4585-ba5f-a690caaa366d" id="ch.2-pt.1-div.6"><no>Division 6</no><heading guid="_f6636dd8-db14-4903-82d4-1e94dd17e1b9" id="ch.2-pt.1-div.6-he">Potential commercial areas</heading><clause affected.by.uncommenced="0" guid="_1fac292c-6b2a-4b7d-8121-6cdb3d12d269" id="sec.89" provision.type="other" spent.amends="0"><no>89</no><heading guid="_1c806197-778d-47db-9da4-4fbf164f8300" id="sec.89-he">Applying for potential commercial area</heading><subclause affected.by.uncommenced="0" guid="_3db7cd7c-65ad-4dc4-8f2d-e281f6da6472" id="sec.89-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The holder of an authority to prospect may apply for a declaration by the Minister that all or a stated part of the area of the authority is a potential commercial area for the authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_680b61ac-38d0-468f-ad14-d2f25e77dde7" id="sec.89-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application must be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_02f05456-a477-4089-8d24-b0f78a299a2f" id="sec.89-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in the approved form; and</txt></block></li><li guid="_9fb2ac4d-f545-4c8f-aa03-7ec5a162c416" id="sec.89-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">accompanied by the fee prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d1a07f97-0987-46c9-acc5-05e3c43d8b4c" id="sec.89-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The application may be made—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1e96ba4e-e836-47dc-b2bb-b7cd66fe5b45" id="sec.89-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for more than 1 part of the area of the authority to prospect; and</txt></block></li><li guid="_941012a8-a165-4f87-ab65-74becec0c776" id="sec.89-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">even if another part of the area of the authority is already a potential commercial area.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" change="ins" guid="_43543e02-55f4-4492-9b4f-5f85c449d174" id="sec.89-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, each part to which the application relates must be part of the same authority to prospect.</txt></block></subclause><subclause affected.by.uncommenced="0" change="renumber" guid="_10f19d16-599a-4cd2-831d-077b650cf5e4" id="sec.89-ssec.5" provision.type="other"><no>(<del xml:space="preserve">4</del><ins xml:space="preserve">5</ins>)</no><block><txt break.before="0">The application must include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a1934035-1ebb-4c06-8100-655ccdd2e6a4" id="sec.89-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a report for, or that includes, the proposed potential commercial area that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2283dc18-4eb7-42d1-a7e1-2302a142dc38" id="sec.89-ssec.5-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">meets the requirements under <intref check="valid" refid="sec.231" target.guid="_38d7e9f3-53ac-433c-b4bb-b6410704f8b9">section 231</intref> for a commercial viability report; and</txt></block></li><li guid="_b463661c-a195-4ca4-ba93-d7503b67f125" id="sec.89-ssec.5-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">is still relevant to the circumstances of the proposed potential commercial area; and</txt></block></li></list></block></li><li guid="_c15f6a1f-c1a5-4318-944b-4a1b5ef5fecc" id="sec.89-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an evaluation program for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_739e2c40-3751-4cc1-8208-6a860bd47b6e" id="sec.89-ssec.5-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">potential petroleum production or storage in the proposed potential commercial area; and</txt></block></li><li guid="_116b4a73-76f4-4ee7-b076-096699c2dba3" id="sec.89-ssec.5-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">market opportunities for potential production or storage; and</txt></block></li></list></block></li><li guid="_432bb922-004f-435c-8d1c-7a48b0ef16aa" id="sec.89-ssec.5-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">information about the compliance or noncompliance with the conditions of the authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" change="renumber" guid="_6cd41160-f4b0-4699-bf8e-efc19ce8a298" id="sec.89-ssec.6" provision.type="other"><no>(<del xml:space="preserve">5</del><ins xml:space="preserve">6</ins>)</no><block><txt break.before="0">However, subsection (<del xml:space="preserve"><intref check="valid" refid="sec.89-ssec.4" target.guid="_10f19d16-599a-4cd2-831d-077b650cf5e4">4)(a) does not apply if—</intref></del><ins xml:space="preserve">5)(a) does not apply if—</ins></txt><list number.type="manual" unnumbered.indent="0"><li guid="_8141af94-e3ab-4256-b424-0fd55a9b60df" id="sec.89-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a commercial viability report or an independent viability assessment relates to, or includes the proposed potential commercial area; and</txt></block></li><li guid="_15b2f6bb-f038-496c-bb90-77472969d67b" id="sec.89-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the report or assessment is still relevant to the circumstances of the proposed potential commercial area.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_4cf0271e-3445-4bd2-9952-79cfb23d50db" id="sec.90" provision.type="other" spent.amends="0"><no>90</no><heading guid="_398bc7ac-a158-4422-bf7c-9179e22a48f3" id="sec.90-he">Deciding potential commercial area application</heading><subclause affected.by.uncommenced="0" guid="_9f20658b-d26a-4c82-bc49-10ac72683208" id="sec.90-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may declare an area the subject of the application to be a potential commercial area only if satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1a0c010b-c574-434b-900b-99b772ced508" id="sec.90-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the area is no more than is needed to cover the maximum extent of a natural underground reservoir identified in the report; and</txt></block></li><li guid="_9adba10d-b1cb-4428-99c5-2c8018448e16" id="sec.90-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">petroleum production or storage in the area to be declared, is not, and will not soon be, commercially viable, but is likely to become viable within 15 years.</txt></block></li></list><note guid="_84cb8b38-55c3-4838-baeb-4560d28caa11-del" id="sec.90-ssec.1-note-del" type="example"><heading change="delReplace" guid="_994b67ca-9c3b-4550-9271-d1839c1c79e3-del" id="sec.90-ssec.1-note-he-del">Note—</heading><block><txt break.before="1"><del xml:space="preserve">See <intref check="valid" refid="sec.85" target.guid="_023f553a-88c4-406b-83f3-4f1e559fb059">section 85</intref><intref check="valid" refid="sec.85-ssec.6" target.guid="_62b52253-531d-48bd-b90c-57eaaac0cfad">(6)</intref><intref check="valid" refid="sec.85-ssec.6-para1.b" target.guid="_71990837-719f-4b23-9968-6e5fcc55ce66">(b)</intref> (Provisions and term of renewed authority).</del></txt></block></note><note guid="_917bcb79-ac88-4176-ab70-8918a9086033" id="sec.90-ssec.1-note" type="example"><heading change="insReplace" guid="_49659d43-aa4b-40f6-b6e1-a75198705fb4" id="sec.90-ssec.1-note-he">Note—</heading><block><txt break.before="1"><ins xml:space="preserve">See section 85.</ins></txt></block></note></block></subclause><subclause affected.by.uncommenced="0" change="insReplace" guid="_581f69b3-cee9-49f7-88af-7851bbbcaa58" id="sec.90-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Also, the area declared must form a single parcel of land.</txt></block></subclause><subclause affected.by.uncommenced="0" change="delReplace" guid="_6e37dcb9-7772-4713-b2ea-3989ed51c8a6-del" id="sec.90-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">Also, the area declared—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fb8e5dd3-9b1a-4c4c-b9c1-85d7959eccc5-del" id="sec.90-ssec.2-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">must not be for more than 75 sub-blocks; and</txt></block></li><li guid="_77d5c589-7c68-4b9d-a7b0-29318b2f1de3-del" id="sec.90-ssec.2-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">must form a single parcel of land.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0c908c68-29ff-45ae-8f1a-c9e3408efa13" id="sec.90-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In deciding the application, regard must be had to whether the conditions of the relevant authority to prospect have been substantially complied with.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7c5d6a46-a916-4897-94d9-31ea08d78023" id="sec.90-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">On refusal of the application, the applicant must be given an information notice about the decision to refuse.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a09378ef-47b9-4480-9612-718f7b1ba54f" id="sec.90-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">To remove any doubt, it is declared that the declaration may be made even if the authority to prospect has been continued in force under <intref check="valid" refid="sec.83" target.guid="_02ef8ff2-7f1b-4587-8d95-b927297c592e">section 83</intref> or <intref check="valid" refid="sec.119" target.guid="_be057a05-7430-4fa3-a7d6-81bf05cb24f4">119</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_60c29752-ded1-4af7-99b3-0806b280a347" id="sec.91" provision.type="other" spent.amends="0"><no>91</no><heading guid="_5354a752-205c-4266-93f7-a3d3120a52fc" id="sec.91-he">Inclusion of evaluation program in work program</heading><subclause affected.by.uncommenced="0" guid="_05c7cdc6-5973-43d8-86e2-57dd019a4d47" id="sec.91-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the declaration is made, the evaluation program that accompanied the application is taken to be an additional part of the existing work program for the authority to prospect.</txt><note guid="_287afa9d-19a0-4b3d-8cb0-097dfbcd0405" id="sec.91-ssec.1-note" type="example"><heading guid="_1c5da7af-ae81-44a1-bda0-133a7784d843" id="sec.91-ssec.1-note-he">Note—</heading><block><txt break.before="1">For requirements about the evaluation program in later work programs, see <intref check="valid" refid="sec.53" target.guid="_97df3c39-d340-40d2-ae72-4bc2fd522de9">section 53</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_2214c1cc-fc0a-477e-83e3-fb21a3b1dcdd" id="sec.91-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If there is an inconsistency between the evaluation program and the rest of the work program, the evaluation program prevails to the extent of the inconsistency.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_617953a1-a466-44f5-bd4f-2dc21995278e" id="sec.92" provision.type="other" spent.amends="0"><no>92</no><heading guid="_2894c451-23ea-4d49-b678-8c5a0ac4b333" id="sec.92-he">Term of declaration</heading><subclause affected.by.uncommenced="0" guid="_872b5a3b-8114-461f-a0e6-6e58aab2104b" id="sec.92-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.93" target.guid="_ae3d5334-7afb-4c24-b3b8-f7e17b64f590">section 93</intref>, a declaration of a potential commercial area continues in force for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_47fd64e6-9d73-4d92-a16e-134b8bb225d4" id="sec.92-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">15 years from the making of the declaration; or</txt></block></li><li guid="_aa1d22ba-7d90-46e3-9917-10b43e800140" id="sec.92-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the declaration states a shorter period during which it is to be in force—the shorter period.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_4eb0e733-74fa-4f6c-a3dd-911de0e7d12d" id="sec.92-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The matters that must be considered in deciding the shorter period include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bbb44a23-b2ed-49c8-9adf-ed44026d42ef" id="sec.92-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">when any petroleum discovery was made; and</txt></block></li><li guid="_442f96b3-8d03-478a-ad5e-a369e6d76856" id="sec.92-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any commercial viability report or independent viability assessment for, or that includes, the proposed potential commercial area.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_08b0f566-9162-4f3b-b93f-c8063d7d4e55" id="sec.92-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Despite <intref check="valid" refid="sec.92-ssec.1" target.guid="_872b5a3b-8114-461f-a0e6-6e58aab2104b">subsection (1)</intref>, the declaration ceases if the authority to prospect holder lodges a notice that the holder no longer wishes the area to be a potential commercial area.</txt><note guid="_1026a36c-a6e3-45aa-a3ed-6f616f1007a4" id="sec.92-ssec.3-note" type="example"><heading guid="_456adf68-48b7-4fba-98ef-2bb93237d557" id="sec.92-ssec.3-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.102" target.guid="_283b33f2-46ca-4f16-8c31-0fd0fb01194f">section 102</intref> (Effect of ending of declaration of potential commercial area).</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_ae3d5334-7afb-4c24-b3b8-f7e17b64f590" id="sec.93" provision.type="other" spent.amends="0"><no>93</no><heading guid="_0820dab5-403a-49a6-b9c6-7961b6c65489" id="sec.93-he">Extension of term of declaration</heading><subclause affected.by.uncommenced="0" guid="_61f9d8a5-ab94-4f61-afa1-09b0bd088fef" id="sec.93-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7026848e-d4b3-4240-94f3-cde9ab74d426" id="sec.93-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a declaration of a potential commercial area is in force for the area of an authority to prospect; and</txt></block></li><li guid="_ec6a82cb-bea2-45cc-b039-c84651fd03e6" id="sec.93-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.8" target.doc.id="act-1989-110" target.guid="_6ec7482d-90fc-40bc-9086-d5a2470454fe" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">chapter 8</legref>, <legref check="valid" jurisd="QLD" refid="ch.8-pt.2" target.doc.id="act-1989-110" target.guid="_f290a68c-5a61-40ee-8f92-3b2a12f36695" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">part 2</legref> or <legref check="invalid" jurisd="QLD" type="act">3</legref>, a coal or oil shale mining lease has been granted over the area;</txt></block></li></list></block><block><txt break.before="1">the Minister may, on the application of the authority to prospect holder, extend the term of the declaration for a period that ends no later than 2 years after the mining lease, or any renewal of the mining lease, ends.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9a6d1d34-b9ba-4670-96e2-eae5ca1a267f" id="sec.93-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application must be accompanied by the fee prescribed under a regulation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a8e4e6bf-7459-4354-bd40-e505dfdf3784" id="sec.93-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">On refusal of the application, the applicant must be given an information notice about the decision to refuse.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b0f3ddcc-d14a-442b-88fd-4ee148deaa6e" id="sec.94" provision.type="other" spent.amends="0"><no>94</no><heading guid="_e26876a1-f87e-4ef1-aade-c587b2683b86" id="sec.94-he">Potential commercial area still part of authority</heading><block><txt break.before="1">A declaration of a potential commercial area does not change the land the subject of the declaration from being—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4d9c8864-29ea-4b6b-8cfd-9573be44b2f7" id="sec.94-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">part of the area of the authority to prospect the subject of the application for the declaration; and</txt></block></li><li guid="_18dace26-ede7-4be2-9102-ec821e06e2e2" id="sec.94-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">subject to the authority.</txt></block></li></list></block></clause></division><division affected.by.uncommenced="0" guid="_33a23677-13dc-4c3f-a3f9-d1cc4212f453" id="ch.2-pt.1-div.7"><no>Division 7</no><heading guid="_21b66fc8-e0e0-4518-9cd7-5c42643b879b" id="ch.2-pt.1-div.7-he">Provisions to facilitate transition to petroleum lease</heading><clause affected.by.uncommenced="0" guid="_13f8ec0c-4586-484a-b381-38db7b79c33a" id="sec.95" provision.type="other" spent.amends="0"><no>95</no><heading guid="_7f2e9c48-30c3-4aad-91b3-06fa84dd22ab" id="sec.95-he">Application of <intref check="valid" refid="ch.2-pt.1-div.7" target.guid="_33a23677-13dc-4c3f-a3f9-d1cc4212f453">div 7</intref></heading><block><txt break.before="1">This division applies if the Minister reasonably considers the holder of an authority to prospect should apply for a petroleum lease for all or part of the area of the authority because—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b6651a09-76eb-4611-9ab5-c41cb4b48c7a" id="sec.95-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">petroleum production in the area—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9f83abbf-b2fc-45eb-b62b-d6c178cef916" id="sec.95-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">is currently commercially viable; or</txt></block></li><li guid="_b11a5a91-c5d6-4ca7-b9c5-3dff3672ef41" id="sec.95-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">is likely to become commercially viable within 2 years; or</txt></block></li></list></block></li><li guid="_2e75f252-7afd-4520-b019-91eda6e6aca0" id="sec.95-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a natural underground reservoir in the area is, or is likely to have, commercial storage potential.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_0b09b268-b9f5-4054-80b3-b09455617421" id="sec.96" provision.type="other" spent.amends="0"><no>96</no><heading guid="_6c2926e9-419c-46af-a454-e803ad6ec718" id="sec.96-he">Ministerial direction to apply for petroleum lease</heading><subclause affected.by.uncommenced="0" guid="_657520c2-0946-4330-b50d-ee02094bf1dc" id="sec.96-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may give the authority holder a notice stating each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_749c7583-37e5-4b62-a558-223677021679" id="sec.96-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that the Minister proposes to do either of the following, (the <defterm guid="_0eca9901-1d4c-404d-96be-dabe38ba4bfc" id="sec.96-ssec.1-def.proposedaction" type="definition">proposed action</defterm>) unless the holder has made an appropriate lease application—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dfead031-528c-473f-8eec-5fc593e584f0" id="sec.96-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">excise a stated area from the area of the authority;</txt></block></li><li guid="_cedd62ae-e4b2-440c-a373-9e51abedc771" id="sec.96-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">cancel the authority;</txt></block></li></list></block></li><li guid="_85478477-410b-4668-9199-84581963d1d5" id="sec.96-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the grounds for the proposed action;</txt></block></li><li guid="_01cb1cc2-7f50-4554-a586-9d8f01ceb319" id="sec.96-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the facts and circumstances forming the basis for the grounds;</txt></block></li><li guid="_48f0ae7f-2e8b-4c25-973d-6d21db2f2e52" id="sec.96-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">that the holder may, within a stated period, lodge submissions about why the holder should not make a petroleum lease application for the stated area.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_45f4ee15-8a13-4328-a945-853da72267f6" id="sec.96-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The stated period must be reasonable, but must not be more than 6 months.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8489816d-8ce7-4143-bcbb-772553f177a9" id="sec.96-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_7ff32d20-b035-49a6-8353-bdebeebc6dba" id="sec.96-ssec.3-def.appropriateleaseapplication_"><txt break.before="1"><defterm guid="_9acd84bd-c604-4bd1-a15d-b89a878f8f0b" id="sec.96-ssec.3-def.appropriateleaseapplication" type="definition">appropriate lease application</defterm> means a petroleum lease application for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_92927384-aaf2-49bf-a37c-5466b1b3d2ce" id="sec.96-ssec.3-def.appropriateleaseapplication-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the stated area or an area that is substantially the same as the stated area; or</txt></block></li><li guid="_e2ac70f3-69ba-4ecd-aec0-74da86ed6648" id="sec.96-ssec.3-def.appropriateleaseapplication-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">another area the Minister reasonably considers will effectively allow the holder to carry out authorised activities for a petroleum lease in relation to the stated area.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f5b38cae-dc69-49cc-96eb-ea11271f2c4c" id="sec.97" provision.type="other" spent.amends="0"><no>97</no><heading guid="_a512f9a7-c18c-491c-9c46-e8dd5c9799e0" id="sec.97-he">Taking proposed action</heading><subclause affected.by.uncommenced="0" guid="_d9fe2e03-a31b-4cf4-8093-01abad53febe" id="sec.97-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Proposed action under <intref check="valid" refid="sec.96" target.guid="_0b09b268-b9f5-4054-80b3-b09455617421">section 96</intref> may be taken only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_33959689-1522-47fc-b3d6-01044cfcc5d8" id="sec.97-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the stated period under <intref check="valid" refid="sec.96" target.guid="_0b09b268-b9f5-4054-80b3-b09455617421">section 96</intref> has ended; and</txt></block></li><li guid="_a1396d3f-97af-4b30-aa14-2ed482ffd455" id="sec.97-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">either—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1f79c14e-fa19-4652-bc1c-40e8f6390192" id="sec.97-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the holder has not made an appropriate petroleum lease application under <intref check="valid" refid="sec.96" target.guid="_0b09b268-b9f5-4054-80b3-b09455617421">section 96</intref>; or</txt></block></li><li guid="_d54fabae-c2a6-438c-80d8-568f95738d41" id="sec.97-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">any appropriate lease application under <intref check="valid" refid="sec.96" target.guid="_0b09b268-b9f5-4054-80b3-b09455617421">section 96</intref> made by the holder has been refused; and</txt></block></li></list></block></li><li guid="_6dc018ce-ec5d-4548-9604-f0970d58351b" id="sec.97-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the Minister has considered any submissions lodged by the holder within the period.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_46f2458e-2959-456f-b0b3-b68765959ff3" id="sec.97-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The decision does not take effect until the holder is given an information notice about the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_125d1bf5-ef72-491e-b5fd-71f7db7622f1" id="sec.97-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A refusal of the application takes effect at end of the appeal period for the decision to refuse.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_9eb4c4fc-afed-4f78-9a67-475a08eb168b" id="ch.2-pt.1-div.8"><no>Division 8</no><heading guid="_da2cce1c-b6c2-44e2-bd37-cb4ac92ca0f4" id="ch.2-pt.1-div.8-he">Miscellaneous provisions</heading><subdivision affected.by.uncommenced="0" guid="_1d26b66b-53eb-4675-b52c-822246be657b" id="ch.2-pt.1-div.8-sdiv.1"><no>Subdivision 1</no><heading guid="_a102b606-2b01-4a71-ad9f-2dac7d8b13ac" id="ch.2-pt.1-div.8-sdiv.1-he">Area provisions</heading><clause affected.by.uncommenced="0" guid="_d8fa1eb9-e567-4ac1-aeb1-e74a6cf013c1" id="sec.98" provision.type="other" spent.amends="0"><no>98</no><heading guid="_ac77cead-5a8d-4a12-a74f-c8f758bbab48" id="sec.98-he">Area of authority to prospect</heading><subclause affected.by.uncommenced="0" guid="_5cbadbc8-33ec-474b-9dae-ff59cc7c9d83" id="sec.98-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section provides for the area of an authority to prospect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c2d42c92-90c1-4e68-9538-7f5d5c1de9bd" id="sec.98-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The area does not include excluded land for the authority.</txt><note guid="_fefb5dea-77c0-40a6-b0e6-4203c3b29138" id="sec.98-ssec.2-note" type="example"><heading guid="_74924b84-39e0-4194-9d4a-13c5b0018f1e" id="sec.98-ssec.2-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.30AB" target.guid="_4abe0a1b-ba8f-40b0-b76e-1e1864fb56ff">section 30AB</intref><intref check="valid" refid="sec.30AB-ssec.3" target.guid="_ce5296c7-9c9d-41c8-92ee-dfb0ac036d8e">(3)</intref> if land in the authority to prospect’s area is taken under a resumption law.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_93d4af88-4d49-462e-87d7-1ccc2a3d110c" id="sec.98-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Unless the Minister otherwise decides, the area must form a single parcel of land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5a9d3dde-dc33-4db8-9f96-d6af45b5bb38" id="sec.98-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The area must not include any of the following (<defterm guid="_cc373795-b3aa-461b-a21b-3bad670723da" id="sec.98-def.unavailableland" type="definition">unavailable land</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6ec13871-e5ec-44a0-b5a2-8ecb0f3aa5d8" id="sec.98-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">land in the area of another petroleum tenure;</txt></block></li><li guid="_cee5775c-0c16-4022-919e-e3c69c3ad125" id="sec.98-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">excluded land for another petroleum tenure;</txt></block></li><li guid="_c1f04883-5f70-49f2-801c-53ad2cc936a5" id="sec.98-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">land in the area of a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> petroleum tenure;</txt></block></li><li guid="_258d6b8e-9ecd-497d-af94-face0673a223" id="sec.98-ssec.4-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">excluded land for a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> petroleum tenure;</txt></block></li><li guid="_df3603fe-9949-4307-a970-4df351f91378" id="sec.98-ssec.4-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">land that a regulation prescribes as land over which an authority to prospect can not be granted.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1e8e7d56-aa55-43e9-a7bb-fe6f4a860c04" id="sec.98-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">To remove any doubt, it is declared that if land within the original notional sub-blocks of the authority ceases to be unavailable land, the cessation itself does not cause the land to be within the area of the authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bdb0ec56-900a-48bd-96f6-0ca7f90a8773" id="sec.98-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The area may include a part of a block only if the part is all areas within the block that are left after taking away all unavailable land within the block (a <defterm guid="_523cda64-7a47-42f7-93c9-0dcd64a22bc8" id="sec.98-def.residualblock" type="definition">residual block</defterm>).</txt><note guid="_c666d065-beae-4604-98dc-0c9cd2155117" id="sec.98-ssec.6-note" type="example"><heading guid="_71cafb65-4c57-4910-a8d3-4c8b5459aaf8" id="sec.98-ssec.6-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.30AB" target.guid="_4abe0a1b-ba8f-40b0-b76e-1e1864fb56ff">section 30AB</intref><intref check="valid" refid="sec.30AB-ssec.3" target.guid="_ce5296c7-9c9d-41c8-92ee-dfb0ac036d8e">(3)</intref> if land in the authority to prospect’s area is taken under a resumption law.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_bbf3f085-6b92-45fe-b3df-4ed0d12f296a" id="sec.98-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">The area must be no more than 100 blocks or residual blocks, in any combination.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f62b657c-aab4-4609-b4fb-1563f8df8dfb" id="sec.99" provision.type="other" spent.amends="0"><no>99</no><heading guid="_86555854-2cd3-43d2-b1ae-58c7816cedad" id="sec.99-he">Minister’s power to decide excluded land</heading><subclause affected.by.uncommenced="0" guid="_859425f8-72ef-4279-9524-8cb6ee2692c2" id="sec.99-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may decide excluded land for an authority to prospect or proposed authority to prospect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e76ff5e6-2a26-4a01-8805-f539c912dfa0" id="sec.99-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the power under <intref check="valid" refid="sec.99-ssec.1" target.guid="_859425f8-72ef-4279-9524-8cb6ee2692c2">subsection (1)</intref> may be exercised only when the Minister is deciding whether to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f24565b7-5e3d-4f12-93a5-4745c9667747" id="sec.99-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">grant or renew the authority; or</txt></block></li><li guid="_436b7714-a8e5-45d7-a276-6edc45f22fcc" id="sec.99-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">approve any later work program for the authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_4be3269c-b866-485e-a36b-0b3a335aca7d" id="sec.99-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, excluded land—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_962f1e33-2f44-426c-8e4f-b3e8c7c16f5c" id="sec.99-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must be within the original notional sub-blocks of the authority; and</txt></block></li><li guid="_10ba89a1-4930-4ae3-a13b-e748baf0d95a" id="sec.99-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">can not be a whole block.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ff09b771-4e58-4af3-b5be-c5573ae994c7" id="sec.99-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">For <intref check="valid" refid="sec.99-ssec.3" target.guid="_4be3269c-b866-485e-a36b-0b3a335aca7d">subsection (3)</intref><intref check="valid" refid="sec.99-ssec.3-para1.a" target.guid="_962f1e33-2f44-426c-8e4f-b3e8c7c16f5c">(a)</intref>, if the register—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_39672abd-9175-4d32-9c2f-d925aa6dbbda" id="sec.99-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">states that the authority’s area includes land within a block; but</txt></block></li><li guid="_4d85ee06-0ebb-4827-8b67-4dcd1a0db6a1" id="sec.99-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">does not include or exclude any particular sub-block within that block;</txt></block></li></list></block><block><txt break.before="1">the reference to the block in the register is a reference to all sub-blocks within the block, other than any sub-block that is completely within the area of another petroleum tenure or a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> petroleum tenure.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ad854e99-54ec-4f22-8eb1-8c4b13033916" id="sec.99-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Excluded land may be described in a way the Minister considers appropriate, including, for example, by area or by reference to a stated type of land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_797c8c6f-84d3-401c-8317-f0f4d14202a9" id="sec.99-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">Land ceases to be excluded land for an authority to prospect if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b835a429-c727-4858-ad7d-2481929da5c2" id="sec.99-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the block in which the land is located is relinquished or, for any other reason, ceases to be in the area of the authority; or</txt></block></li><li guid="_1f55d99e-24e5-496e-bdc7-25e9a5fa6ada" id="sec.99-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a petroleum lease is granted over any of the area of the authority and the land is excluded land for the lease.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_5aa886d4-cfc8-4f39-96cd-b320c5c6ffce" id="sec.100" provision.type="other" spent.amends="0"><no>100</no><heading guid="_1838c924-73c1-4fa8-808d-9ec15bf1cb10" id="sec.100-he">Minister may add excluded land</heading><subclause affected.by.uncommenced="0" guid="_0e40d226-51c9-4560-9ae3-17fabedfcd7e" id="sec.100-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may amend an authority to prospect by adding excluded land for the authority to its area only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e335c4a4-fd80-4820-9b60-9091b6f9cd94" id="sec.100-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the authority as amended complies with <intref check="valid" refid="sec.98" target.guid="_d8fa1eb9-e567-4ac1-aeb1-e74a6cf013c1">section 98</intref>; and</txt></block></li><li guid="_a33a0437-921d-4a41-82e4-8d638e2243d7" id="sec.100-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the authority holder consents.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_47d6bbc3-ab7a-4e5f-a90f-19cf162e5a54" id="sec.100-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If land mentioned in <intref check="valid" refid="sec.100-ssec.1" target.guid="_0e40d226-51c9-4560-9ae3-17fabedfcd7e">subsection (1)</intref> is added to the area of the authority the land ceases to be excluded land for the authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_96f4ba54-a6c8-48e5-8ac7-6e64e6987f16" id="sec.100-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister may amend the provisions of the authority in a way that reflects the inclusion of the excluded land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c39c8e46-943a-43be-9609-bb3a187f8805" id="sec.100-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Also, the Minister may give the authority holder a notice—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4c9b5d89-2d33-410b-9d6a-8a9d1181f58e" id="sec.100-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">withdrawing, from a stated day, the approval of the work program for the authority; and</txt></block></li><li guid="_5eaa722f-d74e-414e-b4c7-915c655b2169" id="sec.100-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">directing the holder to lodge a proposed later work program for the authority that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_93838e1d-a486-4fd4-99c4-c20cf9a9270b" id="sec.100-ssec.4-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">complies with the later work program requirements; and</txt></block></li><li guid="_7a351239-2687-4a88-8dec-632d71fd750a" id="sec.100-ssec.4-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">changes the work program for the authority to reflect the inclusion of the excluded land.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ff39ef21-8604-4475-a7d4-1a6a175b7d64" id="sec.100-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The amended provisions of the authority or the proposed later work program must not be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9efbc71b-9605-47fb-a4fc-3bb64b5e7280" id="sec.100-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">inconsistent with the mandatory conditions for authorities to prospect; or</txt></block></li><li guid="_84addbf8-c778-4d7e-9d7b-18f56f345acb" id="sec.100-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the same as, or substantially the same as, or inconsistent with, any relevant environmental condition for the authority.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_ecb16f24-7357-4c3c-87b6-6fbc88f80008" id="sec.101" provision.type="other" spent.amends="0"><no>101</no><heading guid="_df80c059-55e5-49d5-b53c-67624f41f7ea" id="sec.101-he">Area of authority to prospect reduced on grant of petroleum lease</heading><subclause affected.by.uncommenced="0" guid="_a755d66e-07fb-4a96-ba52-55e4ec79c02e" id="sec.101-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Land ceases to be included in the area of an authority to prospect if a petroleum lease is granted over the land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_119d69b6-a4e3-41ee-abd5-d4252a758bb0" id="sec.101-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If a petroleum lease is granted over all of the area of an authority to prospect, the authority ends.</txt><note guid="_5287a71d-337a-413c-9464-a85da6d1bdef" id="sec.101-ssec.2-note" type="example"><heading guid="_5221f112-9084-4bd8-9f1e-406c2ae62904" id="sec.101-ssec.2-note-he">Note—</heading><block><txt break.before="1">See however <intref check="valid" refid="ch.3" target.guid="_7d989cb7-da2a-4737-842c-bd1944dbb54e">chapter 3</intref>, <intref check="valid" refid="ch.3-pt.4" target.guid="_524d4f73-dd39-49b3-b4c7-37b171f90dd6">part 4</intref>, <intref check="valid" refid="ch.3-pt.4-div.3" target.guid="_ba61d28d-f623-4216-ab6f-e8d20ec27311">division 3</intref> (Exceptions to particular area provisions).</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_283b33f2-46ca-4f16-8c31-0fd0fb01194f" id="sec.102" provision.type="other" spent.amends="0"><no>102</no><heading guid="_ca6a1c5d-f05d-4480-818d-a46fc8043d2d" id="sec.102-he">Effect of ending of declaration of potential commercial area</heading><subclause affected.by.uncommenced="0" guid="_c620e525-2aa6-408e-a1cd-88ea76fe3ec1" id="sec.102-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if all or part of the area of an authority to prospect is a potential commercial area and the declaration of the potential commercial area ends more than 12 years after the authority originally took effect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9d7df814-f9d9-4c1f-b59c-55ca5be93c44" id="sec.102-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the declaration applied to a part of the area of the authority, the part ceases to be included in its area.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c85d3d96-2ac5-4c78-be82-fff6c2972555" id="sec.102-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the declaration applies to all of the area of the authority, the authority ends.</txt><note guid="_3f1fe9ad-cf2c-4bbc-9b96-901879101fef" id="sec.102-ssec.3-note" type="example"><heading guid="_8128d448-c0f7-4df6-b561-3a270da01aa6" id="sec.102-ssec.3-note-he">Note—</heading><block><txt break.before="1">If the declaration ends less than 12 years after the authority originally took effect, see <intref check="valid" refid="sec.94" target.guid="_b0f3ddcc-d14a-442b-88fd-4ee148deaa6e">section 94</intref>.</txt></block></note></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_3cfda009-9166-46c4-b17c-fbd90a12248a" id="ch.2-pt.1-div.8-sdiv.2"><no>Subdivision 2</no><heading guid="_f660aff9-e3e6-456b-b8b9-8324192d0a50" id="ch.2-pt.1-div.8-sdiv.2-he">Dividing authorities to prospect</heading><clause affected.by.uncommenced="0" guid="_83097d28-9e78-456a-b9bb-5a036d76d855" id="sec.103" provision.type="other" spent.amends="0"><no>103</no><heading guid="_4ece5a34-86c2-4a89-b517-67574b2603a1" id="sec.103-he">Applying to divide</heading><subclause affected.by.uncommenced="0" guid="_c32b343e-7c7f-49a5-89df-b6a4fb3aba61" id="sec.103-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The holder of an authority to prospect (the <defterm guid="_8b4b04d2-112f-4680-9efd-f942eaeb8b8e" id="sec.103-def.originalauthority" type="definition">original authority</defterm>) may apply to divide it into 2 or more authorities to prospect (the <defterm guid="_d132f328-2736-4988-bd3f-a8e4503ceff8" id="sec.103-def.newauthorities" type="definition">new authorities</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_282458be-e3bf-42f5-bd44-d3ea76d4e15b" id="sec.103-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the holder may apply for a new authority to be granted to another person only if the other person—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_91e23fe7-2c42-4be1-89f0-02f02f834117" id="sec.103-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">agrees to the proposed grant; and</txt></block></li><li guid="_5dad7f6a-d144-4885-82d3-30553445e0bf" id="sec.103-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is an eligible person.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b362ea36-1bad-49f6-a65d-c7b6089c5178" id="sec.103-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Despite <intref check="valid" refid="sec.103-ssec.1" target.guid="_c32b343e-7c7f-49a5-89df-b6a4fb3aba61">subsections (1)</intref> and <intref check="valid" refid="sec.103-ssec.2" target.guid="_282458be-e3bf-42f5-bd44-d3ea76d4e15b">(2)</intref>, the holder can not make the application if any of the following is outstanding—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_580ec8b1-64c7-47eb-9282-ae9246d43bbf" id="sec.103-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">annual rent for the original authority;</txt></block></li><li guid="_95232626-f481-4742-a376-6b1ee75e09e9" id="sec.103-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a civil penalty under <intref check="valid" refid="sec.76" target.guid="_49036447-7074-4ab0-9fa1-1e6df0025604">section 76</intref> for nonpayment of annual rent;</txt></block></li><li guid="_91238d62-6af5-4601-aff2-e57873dd80e3" id="sec.103-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">interest payable under <intref check="valid" refid="sec.588" target.guid="_a4bc919c-7264-46d2-bbaa-0d47579c4e14">section 588</intref> on annual rent or a civil penalty;</txt></block></li><li guid="_3c5a3011-1ff1-4dc3-8daf-af77b325bf76" id="sec.103-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a royalty-related amount payable by the holder;</txt></block></li><li guid="_252cc3fb-0937-46f4-8e7a-625946042728" id="sec.103-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">security for the original authority, as required under <intref check="valid" refid="sec.488" target.guid="_13f8de44-15a4-4a47-a9af-6464bc374dda">section 488</intref>.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_505d1bab-1a07-4b29-be47-c730c5acf46c" id="sec.104" provision.type="other" spent.amends="0"><no>104</no><heading guid="_6601febe-0225-4636-8baa-cdfc4ce3ebac" id="sec.104-he">Requirements for making application</heading><block><txt break.before="1">The application must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_645ea5ee-b363-4d76-a42d-9f62a7854b55" id="sec.104-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li guid="_0af65d4c-e3f8-4dc7-b17b-e28ee12352bb" id="sec.104-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state whether or not the work program for the original authority to prospect has been complied with; and</txt></block></li><li guid="_6957d47c-47aa-4906-9609-20a8fa56a6f2" id="sec.104-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the work program for the original authority has not been complied with—state details of, and the reasons for, each noncompliance; and</txt></block></li><li guid="_904a8e62-01a0-4728-9f82-3cddbb25b2b6" id="sec.104-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">include a proposed later work program for each proposed new authority; and</txt><note guid="_193d8d8c-de3c-4b2f-8c39-8b62d8c4beaf" id="sec.104-para1.d-note" type="example"><heading guid="_7f5f7265-b725-40dc-9a1f-e55232782a67" id="sec.104-para1.d-note-he">Note—</heading><block><txt break.before="1">For an additional requirement for the proposed work programs, see <intref check="valid" refid="sec.54" target.guid="_51b3bd97-68ac-4b80-9a8a-e830ad889c10">section 54</intref>.</txt></block></note></block></li><li guid="_882595f7-c2fb-416b-9244-b2c94209b7fe" id="sec.104-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">address the capability criteria for each proposed holder of the new authorities; and</txt></block></li><li guid="_8c0d5731-da39-47cd-ae75-be4c68fe2b48" id="sec.104-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">state whether or not the holder has complied with <intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref>, <intref check="valid" refid="ch.5-pt.7" target.guid="_01d524f3-ca84-4e41-ab48-d8ec12875570">part 7</intref>, for reports required to be lodged in relation to the original authority; and</txt></block></li><li guid="_dcf0d123-fce7-4502-9b8c-0abb9d4d3861" id="sec.104-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">be accompanied by the fee prescribed under a regulation.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_b9e5517d-bff8-44dd-82f7-b2804eb97f9e" id="sec.105" provision.type="other" spent.amends="0"><no>105</no><heading guid="_ff6f8f88-7e05-4b66-bd04-568e05b0b752" id="sec.105-he">Deciding application</heading><subclause affected.by.uncommenced="0" guid="_496ae305-73c1-4977-8cc9-709363493b05" id="sec.105-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may make or refuse to make the division.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d218937c-3ea4-48f1-8af7-3c15a01f67a3" id="sec.105-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_49c60d96-9898-4d5d-a51a-9e47e977e13b" id="sec.105-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before deciding to make the division, the Minister must decide whether to approve the proposed later work programs for the new authorities; and</txt></block></li><li guid="_f86843b3-417e-4f0b-83f0-82e0cccb4c0d" id="sec.105-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the division can not be granted unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_314d3374-a0b5-41f2-9ecb-ad3a2d5d75b5" id="sec.105-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the proposed programs have been approved; and</txt></block></li><li guid="_25175485-77ba-49e6-a2bc-5344f18f36a3" id="sec.105-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">each proposed holder of the new authorities satisfies the capability criteria; and</txt></block></li><li guid="_3b37d5f3-e1e1-47fa-acbb-ed44fed93f14" id="sec.105-ssec.2-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the Minister is satisfied the applicant continues to satisfy any special criteria that applied for deciding the application for the original authority; and</txt><note guid="_6a5dc896-bcfd-4352-8fe1-1058753253bb-del" id="sec.105-ssec.2-para1.b-para2.iii-note-del" type="example"><heading change="delReplace" guid="_1212d3e5-7b74-4dcb-800f-c4445e3ea9f2-del" id="sec.105-ssec.2-para1.b-para2.iii-note-he-del">Note—</heading><block><txt break.before="1"><del xml:space="preserve">See <intref check="valid" refid="sec.35" target.guid="_87b53d9f-6f6c-49a9-ad51-118aa252ae58">sections 35</intref><intref check="valid" refid="sec.35-ssec.2" target.guid="_120ae8b4-7377-489d-b475-e040e000f7e2">(2)</intref><intref check="valid" refid="sec.35-ssec.2-para1.e" target.guid="_d6918c74-54bf-4835-9756-6a2f38027506">(e)</intref><intref check="valid" refid="sec.35-ssec.2-para1.e-para2.iii" target.guid="_83d446d8-50bf-4b3c-b96b-81d1b73f0fad">(iii)</intref> (Call for tenders) and <intref check="valid" refid="sec.43" target.guid="_2c0b3e46-8914-4834-bfdb-7d2ff2248ba2">43</intref> (Criteria for decisions).</del></txt></block></note><note guid="_05207312-731a-4581-9342-16e1b59de789" id="sec.105-ssec.2-para1.b-para2.iii-note" type="example"><heading change="insReplace" guid="_33deb9b1-7957-4b2e-8748-b2e077dde9ee" id="sec.105-ssec.2-para1.b-para2.iii-note-he">Note—</heading><block><txt break.before="1"><ins xml:space="preserve">See sections 35(2)(h)(iii) and 43.</ins></txt></block></note></block></li><li guid="_929b51e3-a7a1-4e59-a026-390a52491fc8" id="sec.105-ssec.2-para1.b-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">the Minister is satisfied the applicant has substantially complied with the original authority.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_792c68a0-e05b-48c5-aaef-f77400c6302c" id="sec.105-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The matters that must be considered in making the division include the work program for the original authority, the proposed later work programs and the capability criteria.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_814440a5-b6c4-4d4d-bfdf-9dd89f7457ea" id="sec.105-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The Minister may, as a condition of making the division, require the applicant to, under <intref check="valid" refid="sec.488" target.guid="_13f8de44-15a4-4a47-a9af-6464bc374dda">section 488</intref>, give security or additional security for all or any of the new authorities within a stated reasonable period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_898bdfc7-4347-4474-8d1e-6e252db9ab73" id="sec.105-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the applicant does not comply with the requirement, the division may be refused.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d2b73f0c-951a-423f-9c93-8be35e9229e2" id="sec.106" provision.type="other" spent.amends="0"><no>106</no><heading guid="_d511bdfb-1daa-4d5a-828f-fe4ebb812265" id="sec.106-he">Provisions of new authorities</heading><subclause affected.by.uncommenced="0" guid="_fd95e9fc-62c3-416c-aabf-b7b1e4528fa2" id="sec.106-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Subject to this section, <intref check="valid" refid="sec.42" target.guid="_37ce7fc5-36f4-4382-9a31-d9859bb50de9">section 42</intref> applies for the provisions of a new authority as if it were an authority to prospect granted under <intref check="valid" refid="ch.2-pt.1-div.2" target.guid="_a1146b5d-98c7-49a7-aa91-b3a012b06cc6">division 2</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_74847835-f95b-488a-9a9f-1a832be686f9" id="sec.106-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_62a4e221-9138-4811-ad09-777c93b02b60" id="sec.106-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the term of each new authority must not end later than the end of the term of the original authority; and</txt></block></li><li guid="_0ea392b1-4eae-4643-976d-3b17a7ed303b" id="sec.106-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the new authorities must have the same relinquishment days as the original authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2d338858-0b46-43d9-b7ad-4ed5b80ec9e5" id="sec.106-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For the relinquishment condition for the new authorities—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e1053b37-108d-45c0-bbb1-1ee51e3f73fe" id="sec.106-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the new authorities are taken to have originally taken effect when the original authority originally took effect; and</txt></block></li><li guid="_b765104f-5a2d-44f1-b08f-7c56bc3c71ee" id="sec.106-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the original notional sub-blocks of the original authority are divided rateably between the new authorities; and</txt></block></li><li guid="_50eeb99c-be56-4fc2-8e91-f9c0c8de07f5" id="sec.106-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">for working out previous relinquishments that are counted for the relinquishment condition for each new authority, the relinquishments previously counted for the relinquishment condition for the original authority are divided rateably between the new authorities.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1c3daf46-453b-4454-aadf-76db1746cda1" id="sec.107" provision.type="other" spent.amends="0"><no>107</no><heading guid="_007b8377-79ab-4ffd-96c0-17f31cf42c67" id="sec.107-he">Steps after deciding application</heading><subclause affected.by.uncommenced="0" guid="_020dadd6-0fee-4567-ab6b-21c04de785a6" id="sec.107-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">After the provisions of the new authorities are decided, the applicant and anyone else who will be a holder of any new authority, must be given notice of the relevant provisions and work program.</txt><note guid="_6e0bcbab-e484-44ed-978c-74183dda4827" id="sec.107-ssec.1-note" type="example"><heading guid="_e8e10f33-1cff-4517-b556-24af2bab7168" id="sec.107-ssec.1-note-he">Note—</heading><block><txt break.before="1">For noncompliance action started, or that could have been taken, against the original authority holder, see <intref check="valid" refid="sec.792" target.guid="_edda888c-32e2-4766-aa77-c71b8cc8d351">section 792</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_b0f53b66-03b0-4589-8c36-9983a60feefd" id="sec.107-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On refusal to make the division, the applicant must be given notice of the refusal.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" change="ins" guid="_e2cb6f9e-4a3b-43f7-bb40-5caf4314d087" id="ch.2-pt.1-div.8-sdiv.2A"><no>Subdivision 2A</no><heading guid="_ff2acdc9-9e17-49fb-9c48-df239a048569" id="ch.2-pt.1-div.8-sdiv.2A-he">Amalgamating potential commercial areas</heading><clause affected.by.uncommenced="0" guid="_e5b6654a-ccde-4ff4-a9d0-f6805b13f29b" id="sec.107AA" provision.type="other" spent.amends="0"><no>107AA </no><heading guid="_6de3af6f-8d02-4d28-b79f-e83e649832f8" id="sec.107AA-he">Applying to amalgamate</heading><subclause affected.by.uncommenced="0" guid="_951d608e-9426-4b45-ac37-a7dce4d543de" id="sec.107AA-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The holder of an authority to prospect may apply to the Minister to amalgamate 2 or more potential commercial areas for the authority to prospect into a single potential commercial area for the authority to prospect (the <defterm guid="_5600bdbd-bd9f-4c49-afb6-9abf4c66047f" id="sec.107AA-def.amalgamatedpotentialcommercialarea" type="definition">amalgamated potential commercial area</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_250e3006-26d7-4e7b-a435-9409a0f37495" id="sec.107AA-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The holder can not make an application under subsection (1) if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_11148a3c-56d7-49a9-b97d-382d9f1c5415" id="sec.107AA-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the holder has not complied with a provision of this Act; or</txt></block></li><li guid="_0de37670-1b2a-4c1c-8d20-d4eb5ff80c63" id="sec.107AA-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any of the following amounts is outstanding in relation to the authority to prospect—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_954eccc1-8381-405d-bc1a-1a07f047c046" id="sec.107AA-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">annual rent;</txt></block></li><li guid="_08f6677d-f50c-4475-8726-5b8a104014b1" id="sec.107AA-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a civil penalty under section 76 for non-payment of annual rent;</txt></block></li><li guid="_229902f7-c72d-41e5-891f-53492d3f2bbb" id="sec.107AA-ssec.2-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">interest payable under section 588 on annual rent or a civil penalty;</txt></block></li><li guid="_3f519810-9df1-4fc5-83d2-4425bcc60687" id="sec.107AA-ssec.2-para1.b-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">a royalty-related amount payable by the holder;</txt></block></li><li guid="_8268dd26-5553-451a-8b84-854970fc8587" id="sec.107AA-ssec.2-para1.b-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">security required under section 488.</txt></block></li></list></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b84572a9-97b7-468c-b08e-510eb8bd4342" id="sec.107AB" provision.type="other" spent.amends="0"><no>107AB </no><heading guid="_f3ffe181-73a2-4267-be15-dfcbc3e3e264" id="sec.107AB-he">Requirements for making application</heading><block><txt break.before="1">The application must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ac3dee2a-c387-425e-b088-1403f904194e" id="sec.107AB-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li guid="_6e7ecd3a-93c0-4015-8a0e-c1887bff128f" id="sec.107AB-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">include a report for, or that includes, the proposed amalgamated potential commercial area that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_af7f498c-358f-4994-8499-f5d78b42375f" id="sec.107AB-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">meets the requirements under section 231 for a commercial viability report; and</txt></block></li><li guid="_a0cc5383-b751-4332-b056-14e83c124769" id="sec.107AB-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">is still relevant to the circumstances of the proposed amalgamated potential commercial area; and</txt></block></li></list></block></li><li guid="_3584cfd0-5d03-4d9d-b485-e0619c5c6207" id="sec.107AB-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">include a proposed evaluation program for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8a48e3ea-e758-4a54-9dc9-273d12aeabdc" id="sec.107AB-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">potential petroleum production or storage in the proposed amalgamated potential commercial area; and</txt></block></li><li guid="_f2195ff5-18e6-404a-9c64-fad9e8515979" id="sec.107AB-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">market opportunities for the potential petroleum production or storage mentioned in subparagraph (i); and</txt></block></li></list></block></li><li guid="_462da6f2-4b2b-47c2-8382-7287a6e6b305" id="sec.107AB-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">be accompanied by the fee prescribed by regulation.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_1441c0fa-a1a6-4423-a392-681dc2ed071b" id="sec.107AC" provision.type="other" spent.amends="0"><no>107AC </no><heading guid="_bdef3967-8e8f-49db-8e94-03e59ffafd10" id="sec.107AC-he">Deciding application</heading><subclause affected.by.uncommenced="0" guid="_38ded357-fa2d-4162-b7bc-77ed266fb90a" id="sec.107AC-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may declare the amalgamated potential commercial area for the authority to prospect only if satisfied the area is no more than is needed to cover the maximum extent of a natural underground reservoir identified in the report mentioned in section 107AB(b).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f1478207-cf08-4eed-b951-cf62a0e69d1b" id="sec.107AC-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Also—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a658e9e6-c6eb-4e12-94ab-a2a4183558cd" id="sec.107AC-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before deciding to declare the amalgamated potential commercial area for the authority to prospect, the Minister must decide whether to approve the proposed evaluation program for the amalgamated potential commercial area; and</txt></block></li><li guid="_43680842-9865-411a-b2e0-c9df29dd9055" id="sec.107AC-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the amalgamated potential commercial area can not be declared unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5c680e0b-9484-4df9-a5a3-debd9351f7df" id="sec.107AC-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the proposed evaluation program for the amalgamated potential commercial area has been approved; and</txt></block></li><li guid="_50d94c79-2128-49fd-a2eb-7dfc52ef090c" id="sec.107AC-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the Minister is satisfied the holder of the authority to prospect— </txt><list number.type="manual" unnumbered.indent="0"><li guid="_2a088d80-d438-40b3-9de0-0458bd2f771b" id="sec.107AC-ssec.2-para1.b-para2.ii-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">continues to satisfy the capability criteria that applied in relation to the authority; and</txt></block></li><li guid="_4d92bbc1-1cfe-47f7-a37c-736ff2f27c12" id="sec.107AC-ssec.2-para1.b-para2.ii-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">continues to satisfy any special criteria that applied in relation to the authority; and</txt></block></li><li guid="_1c557672-fa09-4970-8ce2-1d5f53009cb3" id="sec.107AC-ssec.2-para1.b-para2.ii-para3.C" provision.type="other"><no>(C)</no><block><txt break.before="0">has substantially complied with the conditions of the authority.</txt></block></li></list></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_072a8c8f-fcb7-4c25-af43-87d6ae31e213" id="sec.107AC-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister may, as a condition of declaring the amalgamated potential commercial area for the authority to prospect, require the applicant to give security or additional security for the authority to prospect, under section 488, within a stated reasonable period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a5341254-7624-45f3-bd6d-d77179cde62b" id="sec.107AC-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the applicant does not comply with a requirement under subsection (3), the application may be refused.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_044c1d26-80fd-4803-9be7-02a120251d37" id="sec.107AD" provision.type="other" spent.amends="0"><no>107AD </no><heading guid="_ee65462e-9ba1-4dbd-a496-031bd0d13282" id="sec.107AD-he">Term of declaration</heading><subclause affected.by.uncommenced="0" guid="_848133d0-9edd-4be1-9145-96715ad2cad1" id="sec.107AD-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A declaration of an amalgamated potential commercial area for an authority to prospect continues in force for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5a01387c-571f-44cd-aa82-24c6d4b537ae" id="sec.107AD-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">15 years from the making of the latest of the declarations of the potential commercial areas for the authorities to prospect that have been amalgamated; or</txt></block></li><li guid="_59efbe97-6118-46f7-ae6e-e1095d046966" id="sec.107AD-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the shorter period decided by the Minister when making the declaration and stated in the notice given under section 107AE(1).</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_aa1cdaff-28ea-4d02-8bf0-e4d9712bffd3" id="sec.107AD-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The matters that must be considered in deciding the shorter period include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7ab403ac-e9d5-42b3-a81b-0ea6e0063f3a" id="sec.107AD-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">when any petroleum discovery was made; and</txt></block></li><li guid="_ed803cf1-e22c-4474-9a06-d85f1f8a5a0f" id="sec.107AD-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the report and proposed evaluation program mentioned in section 107AB(b) and (c) that accompanied the application for amalgamation or an independent viability assessment for, or that includes, the amalgamated potential commercial area.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1eb20682-289f-4c8c-8dca-6639a11dd809" id="sec.107AE" provision.type="other" spent.amends="0"><no>107AE </no><heading guid="_bb58f00a-8a3e-45fa-a69d-15a4ea57834f" id="sec.107AE-he">Steps after deciding application</heading><subclause affected.by.uncommenced="0" guid="_9ff37d52-e9fd-4dab-8ebb-4a893a27230b" id="sec.107AE-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the Minister decides to declare the amalgamated potential commercial area for the authority to prospect, the Minister must give the holder of the authority to prospect notice of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8783a109-f134-4eaa-a4f7-e20538c50475" id="sec.107AE-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the term of the declaration; and</txt></block></li><li guid="_824ceb1e-4472-45c5-8f22-91f642c17fcc" id="sec.107AE-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the evaluation program approved for the amalgamated potential commercial area.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_32ebaa54-03b9-4dec-a6a3-456cb2c6526b" id="sec.107AE-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the Minister decides to refuse to declare the amalgamated potential commercial area for the authority to prospect, the Minister must give the applicant an information notice for the decision.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_9f8daee8-592e-4dd7-89e0-ce70acabe973" id="ch.2-pt.1-div.8-sdiv.3"><no>Subdivision 3</no><heading guid="_0b41fc88-1538-4d7f-96e4-41e4df9a6e55" id="ch.2-pt.1-div.8-sdiv.3-he">Special amendment of relinquishment requirements or work program</heading><clause affected.by.uncommenced="0" guid="_3767afe6-928f-4448-8e44-92c8e43d5d9c" id="sec.107A" provision.type="other" spent.amends="0"><no>107A</no><heading guid="_b359fa01-5c35-4975-aeb0-cd8aa22af9fa" id="sec.107A-he">Application for special amendment</heading><subclause affected.by.uncommenced="0" guid="_bd9deae8-5541-4368-bd04-396ffc039f80" id="sec.107A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The holder of an authority to prospect may apply to the Minister to approve an amendment (a <defterm guid="_5068e11d-5a08-4854-9f42-5551d9e56715" id="sec.107A-def.specialamendment" type="definition">special amendment</defterm>) of either or both of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5e0d9c1c-ecdf-4225-8cdc-96754d3f5b5a" id="sec.107A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the operation of the relinquishment requirements for the authority to prospect;</txt></block></li><li guid="_da482c50-81be-4859-b52e-c6b03311bc9f" id="sec.107A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the work program for the authority to prospect.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" change="insReplace" guid="_ee93cdc8-d3e2-47cb-8c01-0a59665cc904" id="sec.107A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the holder may apply for the special amendment only if the special amendment is necessary because of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_58113150-9685-4e43-94ea-6920cb4f5ecf" id="sec.107A-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an exceptional event affecting the authority; or</txt></block></li><li guid="_469a23ee-7d57-41ed-99f1-d52aac4d365c" id="sec.107A-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">circumstances arising from the authority forming part of an exploration project. </txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" change="ins" guid="_d63a675d-7fc5-4260-9f2d-fe44209dd3dd" id="sec.107A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The application must state the event mentioned in subsection (2)(a), or the circumstances mentioned in subsection (2)(b), and how the event or circumstances justify the special amendment.</txt></block></subclause><subclause affected.by.uncommenced="0" change="delReplace" guid="_6e6a3844-57dc-455d-8cae-7559a1aa7aeb-del" id="sec.107A-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">The application must state the circumstances that exist in relation to the authority to prospect and how the circumstances justify the special amendment.</txt><note guid="_1b0c53c3-6ed6-495c-918b-02b9f0515efb-del" id="sec.107A-ssec.2-note-del" type="example"><heading guid="_13a82b52-ea92-43ee-94d0-f6095011bf7a-del" id="sec.107A-ssec.2-note-he-del">Example—</heading><block><txt break.before="1">A special amendment of an authority to prospect might be justified on the basis the amendment is appropriate because the authority forms part of a wider project.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" change="renumber" guid="_65cead16-bb61-461c-acf6-c50e79c1becf" id="sec.107A-ssec.4" provision.type="other"><no>(<del xml:space="preserve">3</del><ins xml:space="preserve">4</ins>)</no><block><txt break.before="0">The application must be accompanied by the prescribed fee.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_4af5e458-f192-40ab-8eaa-66b92bbbfd33" id="sec.107B" provision.type="other" spent.amends="0"><no>107B</no><heading guid="_523ec56b-c7ad-43a8-a65a-966651599c7d" id="sec.107B-he">Special amendment of relinquishment requirements</heading><subclause affected.by.uncommenced="0" guid="_f163314d-7c3a-4bc0-817a-0af63929d696" id="sec.107B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the Minister approves a special amendment of the operation of the relinquishment requirements for an authority to prospect, the relinquishment requirements have effect subject to the special amendment.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3532de44-4a36-4731-91d3-48e5a72407c2" id="sec.107B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In approving the special amendment, the Minister may also approve a change of the conditions of the authority to prospect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3a1d7c58-5d53-428d-bb41-50877c1046e2" id="sec.107B-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">On the day the approval takes effect, the change of the conditions also takes effect.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2045d7f9-0d0c-4323-9fd8-6623df09681d" id="sec.107C" provision.type="other" spent.amends="0"><no>107C</no><heading guid="_70250ece-72ec-4dce-9d66-860d8235170d" id="sec.107C-he">Special amendment of work program</heading><subclause affected.by.uncommenced="0" guid="_0605baf1-a893-452f-8e1d-828907fc55c9" id="sec.107C-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the Minister approves a special amendment of the work program for an authority to prospect, the work program as amended has effect as if the amendment had been approved under <intref check="valid" refid="ch.2-pt.1-div.3" target.guid="_68a7a1d9-c152-465c-9d27-7eebd1ad4060">division 3</intref>, <intref check="valid" refid="ch.2-pt.1-div.3-sdiv.6" target.guid="_32b497cb-19b1-442c-975a-0c9ddae56156">subdivision 6</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f804e5b6-4735-46cf-a89d-477356cd1cea" id="sec.107C-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In approving the special amendment, the Minister may also approve a change of the conditions of the authority to prospect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1ff6a078-919b-4465-9680-b8dcf5f3e872" id="sec.107C-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">On the day the approval takes effect, the change of the conditions also takes effect.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_955469b3-2cee-474f-993b-5b9027c5c037" id="sec.107D" provision.type="other" spent.amends="0"><no>107D</no><heading guid="_e69bb34d-9ac2-49dd-8656-5d6c23b3b4b6" id="sec.107D-he">Approval of special amendment</heading><subclause affected.by.uncommenced="0" guid="_513a37f2-f824-484b-b5e2-e29999e04e65" id="sec.107D-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may approve a special amendment under this subdivision if the Minister considers the amendment is justified <ins xml:space="preserve">by an event mentioned </ins>in <del xml:space="preserve">the</del><ins xml:space="preserve">section 107A(2)(a) or</ins> circumstances<ins xml:space="preserve"> mentioned in section 107A(2)(b)</ins>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8e73bee2-f676-4b33-bbdf-2fc0fdc46878" id="sec.107D-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting the matters the Minister may have regard to, the Minister may have regard to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3cac2beb-e452-4b54-9e42-a41e11089847" id="sec.107D-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the optimisation of the development and use of the State’s petroleum resources; and</txt></block></li><li guid="_c6623a61-78d1-4318-aa4c-73739042d7cb" id="sec.107D-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether, in the circumstances, the relinquishment requirements or the work program amendment provisions allow for sufficient flexibility to achieve the optimisation mentioned in <intref check="valid" refid="sec.107D-ssec.2-para1.a" target.guid="_3cac2beb-e452-4b54-9e42-a41e11089847">paragraph (a)</intref>.</txt></block></li></list></block></subclause></clause></subdivision></division></part><part affected.by.uncommenced="0" guid="_f0429453-3af6-43cd-a6dd-cfc8b78be0a9" id="ch.2-pt.2"><no>Part 2</no><heading guid="_b7e985e0-35bf-413d-a22f-666d06c56b1f" id="ch.2-pt.2-he">Petroleum leases</heading><division affected.by.uncommenced="0" guid="_526a1e56-68ca-4b89-b8fb-4be7083ed4eb" id="ch.2-pt.2-div.1"><no>Division 1</no><heading guid="_68b14f1f-cac1-4b01-b80c-471ca5c7c698" id="ch.2-pt.2-div.1-he">Key authorised activities</heading><subdivision affected.by.uncommenced="0" guid="_92bc5ebe-6bdd-4420-8950-aca1271deb6d" id="ch.2-pt.2-div.1-sdiv.1"><no>Subdivision 1</no><heading guid="_40e5300b-e779-4ee8-aacc-359ed9c7f605" id="ch.2-pt.2-div.1-sdiv.1-he">General provisions</heading><clause affected.by.uncommenced="0" guid="_c0d61f4b-6f13-44c9-befe-4206d659b46f" id="sec.108" provision.type="other" spent.amends="0"><no>108</no><heading guid="_1a8c67ba-866b-40b0-9d40-b9675004859b" id="sec.108-he">Operation of <intref check="valid" refid="ch.2-pt.2-div.1-sdiv.1" target.guid="_92bc5ebe-6bdd-4420-8950-aca1271deb6d">sdiv 1</intref></heading><subclause affected.by.uncommenced="0" guid="_1689beaf-e431-4826-a218-bc563392cbf7" id="sec.108-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This subdivision provides for the key authorised activities for a petroleum lease.</txt><note guid="_7c6660fd-47db-44c8-b5ff-1f6267b2588a" id="sec.108-ssec.1-note" type="example"><heading guid="_51844a7f-9e42-4cee-8e54-5fcc3bd6ef6b" id="sec.108-ssec.1-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_a3638b5e-6b21-4c91-8094-42b0abb0cce0" id="sec.108-ssec.1-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">For other authorised activities, see <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.4" target.guid="_b576db0f-1676-41bb-9d2a-0c120f59c456">part 4</intref>, <intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref>, <intref check="valid" refid="ch.5-pt.8" target.guid="_6fd5c183-bb2d-498f-bceb-5e0aff62d198">part 8</intref> and the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-2014-047" target.guid="_78e7ee55-dcff-4087-b0b9-13497e839af3" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">chapter 3</legref>, <legref check="valid" jurisd="QLD" refid="ch.3-pt.2" target.doc.id="act-2014-047" target.guid="_adcc85c6-c389-49c8-b998-858dca31ac1f" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">part 2</legref>.</txt></block></li><li guid="_f6bd446c-c09b-4893-8fa5-357a32e6948a" id="sec.108-ssec.1-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">The carrying out of particular activities on particular land in a petroleum lease’s area may not be authorised following the taking of the land under a resumption law. See <intref check="valid" refid="sec.30AB" target.guid="_4abe0a1b-ba8f-40b0-b76e-1e1864fb56ff">section 30AB</intref>.</txt></block></li></list></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_366a3b84-b7cd-48b5-a127-b11dbbad1232" id="sec.108-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The authorised activities may be carried out despite the rights of an owner or occupier of land on which they are exercised.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e035c1c1-5d23-4c3b-aa88-e3454852c8d5" id="sec.108-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the carrying out of the authorised activities is subject to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9cf9aefd-369c-455c-9535-71a0dd4a422c" id="sec.108-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0"><intref check="valid" refid="sec.6" target.guid="_6c6a5ac8-799d-44d8-9fef-34a0d04ecce2">section 6</intref>; and</txt></block></li><li guid="_fdf34a05-b7d2-402e-80cd-58e7c66ad338" id="sec.108-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0"><intref check="valid" refid="ch.2-pt.2-div.1-sdiv.2" target.guid="_d18d52c1-b688-40bb-8269-e5ff8e40675d">subdivision 2</intref>; and</txt></block></li><li guid="_555cf564-b278-4430-a4ad-6ca701d1b9ad" id="sec.108-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0"><intref check="valid" refid="ch.3A" target.guid="_4864cab3-5ae5-49c9-aeb6-cdfaa85590af">chapter 3A</intref>, <intref check="valid" refid="ch.3A-pt.5" target.guid="_fa8a3d9c-8f2e-42e4-9995-76304c3d08e0">part 5</intref>; and</txt></block></li><li guid="_858b099f-25ab-42ae-9a02-40307ccb2d38" id="sec.108-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0"><intref check="valid" refid="ch.3" target.guid="_7d989cb7-da2a-4737-842c-bd1944dbb54e">chapter 3</intref>, <intref check="valid" refid="ch.3-pt.5" target.guid="_59822ecb-942d-4546-ac03-3b1428443975">part 5</intref>, <intref check="valid" refid="ch.3-pt.5-div.1" target.guid="_41279ea8-a7b6-42e9-b6cc-0b6680ceea46">division 1</intref>; and</txt></block></li><li guid="_25f23380-84e0-45a3-81cf-ef81d516c4f4" id="sec.108-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">chapters 5 and 9; and</txt></block></li><li guid="_c9cae2c6-175c-4d4f-9f4e-804327f52f14" id="sec.108-ssec.3-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">the mandatory and other conditions of the lease; and</txt></block></li><li guid="_84088aee-6b5a-4565-9488-c0c85bc108a3" id="sec.108-ssec.3-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">any exclusion or restriction provided for in the lease on the carrying out of the activities; and</txt></block></li><li guid="_0f9643dc-91eb-4aaf-b608-469a52ccff40" id="sec.108-ssec.3-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">any other relevant Act or law.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_06f97274-f5a7-4edf-b62f-55b51be78125" id="sec.109" provision.type="other" spent.amends="0"><no>109</no><heading guid="_c4d590e8-8ed3-4f55-97f7-00c1c40d90a7" id="sec.109-he">Exploration, production and storage activities</heading><subclause affected.by.uncommenced="0" guid="_ea3729ec-2cd9-4fd9-b4d9-ddc35e9ada8d" id="sec.109-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The lease holder may carry out the following activities in the area of the lease—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dbb460ee-eb7f-4705-a18b-be663f303c48" id="sec.109-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">exploring for petroleum;</txt></block></li><li guid="_0710cea7-604b-494c-aa24-e4c938827d8e" id="sec.109-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">subject to <intref check="valid" refid="sec.150A" target.guid="_28d5e4f1-45d3-4468-a0c8-c40686dec0cf">sections 150A</intref> and <intref check="valid" refid="sec.150C" target.guid="_c8284da4-5701-4f54-ade5-52a0612f7e9d">150C</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_030c044f-d637-4c6e-a418-d3c2368ff7d0" id="sec.109-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">testing for petroleum production; and</txt></block></li><li guid="_82aa0e66-825e-4a89-bcbb-12b479c194b2" id="sec.109-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">evaluating the feasibility of petroleum production; and</txt></block></li><li guid="_d90c92f6-af89-4959-8bc9-e7a116d78732" id="sec.109-ssec.1-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">testing natural underground reservoirs for storage of petroleum or a prescribed storage gas;</txt></block></li></list></block></li><li guid="_a0eddb9f-c0ef-46ba-8b02-90fed3604f80" id="sec.109-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">petroleum production;</txt></block></li><li guid="_2a494946-3088-4c45-8936-a239c5afd617" id="sec.109-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">evaluating, developing and using natural underground reservoirs for petroleum storage or to store prescribed storage gases, including, for example, to store petroleum or prescribed storage gases for others;</txt></block></li><li guid="_5d3b5e79-5418-46e6-9170-d144e4c33dbf" id="sec.109-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">plugging and abandoning, or otherwise remediating, a bore or well the lease holder reasonably believes is a legacy borehole and rehabilitating the surrounding area in compliance with the requirements prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5b7b9f78-ad94-4ea8-ab20-00dd02de9aa2" id="sec.109-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the holder must not carry out any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0826d86d-9f1a-4310-9b0e-ded162b1de4e" id="sec.109-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">extraction or production of a gasification or retorting product from coal or oil shale by a chemical or thermal process;</txt></block></li><li guid="_072decf3-4492-4f9a-a19a-5cdbc84f4cdd" id="sec.109-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">exploration for coal or oil shale to carry out extraction or production mentioned in <intref check="valid" refid="sec.109-ssec.2-para1.a" target.guid="_0826d86d-9f1a-4310-9b0e-ded162b1de4e">paragraph (a)</intref>;</txt></block></li><li guid="_ef306159-bbe4-485a-a212-88a66018ab88" id="sec.109-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">GHG stream storage.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_370be233-be13-4ac2-b87c-60a7b268ce57" id="sec.109-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The rights under <intref check="valid" refid="sec.109-ssec.1" target.guid="_ea3729ec-2cd9-4fd9-b4d9-ddc35e9ada8d">subsection (1)</intref> may be exercised only by or for the holder.</txt><note guid="_91c1aa99-0ec2-42d8-bf2d-a428d14be730" id="sec.109-ssec.3-note" type="example"><heading guid="_c040af28-af5e-49d3-ae84-5ea7eb550dc9" id="sec.109-ssec.3-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.800" target.guid="_3414ab4a-2c38-4af9-b578-754022462d1e">section 800</intref> (Restriction on petroleum tenure activities).</txt></block><block><txt break.before="1">For who may exercise the rights for the holder, see <intref check="valid" refid="sec.563" target.guid="_67d472c3-9467-468b-8bb0-c21101321b5e">section 563</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_a4caebdf-e202-4eab-a146-447a8b51ccde" id="sec.109-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The right to store petroleum or prescribed storage gases for others is subject to <intref check="valid" refid="ch.2-pt.6" target.guid="_55412cd7-ecff-4e2b-99fa-1c2290aac632">part 6</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f5c6eb9d-48d0-40de-8bca-ad56d12d0147" id="sec.110" provision.type="other" spent.amends="0"><no>110</no><heading guid="_9da24e8a-de41-4c4a-b2b6-b5f7e3a60565" id="sec.110-he">Construction and operation of petroleum pipelines</heading><subclause affected.by.uncommenced="0" guid="_e88f6622-76d7-49c8-99b8-692b3c203032" id="sec.110-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The lease holder may construct and operate petroleum pipelines in the area of the lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c57cc991-f883-446b-864a-a7dce9b663e3" id="sec.110-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if a petroleum pipeline extends beyond the area of the lease, <intref check="valid" refid="sec.110-ssec.1" target.guid="_e88f6622-76d7-49c8-99b8-692b3c203032">subsection (1)</intref> applies only if the pipeline is completely within—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bdcffbc8-7a35-449e-b489-3242f92b903d" id="sec.110-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the area of the lease; and</txt></block></li><li guid="_46a1051e-f296-460b-917a-37d796cda435" id="sec.110-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the area of 1 or more other petroleum leases that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_493cb1c5-e9c4-4820-8170-43291918012f" id="sec.110-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">are also held by the holder of the lease; or</txt></block></li><li guid="_71e79525-1c64-4e2e-baaa-a49efa0af213" id="sec.110-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">are the subject of a coordination arrangement between the holder of the lease and the holder of each other lease.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3f4bd041-2434-40d1-9159-a23ef790d170" id="sec.110-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_8b077220-82bd-4e1a-9efe-9e945434f828" id="sec.110-ssec.3-def.petroleumpipeline_"><txt break.before="1"><defterm guid="_b3ccf3fc-a9c3-40b5-b623-75c05ddde070" id="sec.110-ssec.3-def.petroleumpipeline" type="definition">petroleum pipeline</defterm> means a pipeline as defined under <intref check="valid" refid="sec.16" target.guid="_78b3e1f4-de3e-4047-b212-fc9d0c03967e">section 16</intref> other than a pipeline for transporting a GHG stream.</txt><note guid="_bc27d3d7-9cd4-4452-b818-f6f1b95629ea" id="sec.110-ssec.3-def.petroleumpipeline-note" type="example"><heading guid="_4c2d74dc-dfb2-4b0c-89c6-8fd6e908198e" id="sec.110-ssec.3-def.petroleumpipeline-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_7966b882-f891-446d-a5ff-59d5fa7c2d9f" id="sec.110-ssec.3-def.petroleumpipeline-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">See also the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.386" target.doc.id="act-2009-003" target.guid="_47dc29d5-fcf5-4fca-81ba-0ab5605dca08" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act">section 386</legref> (Restriction on GHG storage activities).</txt></block></li><li guid="_68c78dac-912d-4fd5-b6a7-1de2da8c0467" id="sec.110-ssec.3-def.petroleumpipeline-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">For the granting of licences under this Act for pipelines for GHG streams, see <intref check="valid" refid="sec.16" target.guid="_78b3e1f4-de3e-4047-b212-fc9d0c03967e">sections 16</intref>, <intref check="valid" refid="sec.394" target.guid="_5e798ca2-bc66-4101-9259-745026f9e34c">394</intref>, <intref check="valid" refid="sec.400" target.guid="_908050e4-a541-4069-85eb-0436d71a7c9e">400</intref> and <intref check="valid" refid="sec.402" target.guid="_162af7e9-4ec5-415a-92d5-f4bf364cfe65">402</intref>.</txt></block></li></list></block></note></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d6289425-6e43-44cb-8620-378cf64f3314" id="sec.111" provision.type="other" spent.amends="0"><no>111</no><heading guid="_88492b4e-ce49-4b78-ba93-fe2d94f71f75" id="sec.111-he">Petroleum processing</heading><subclause affected.by.uncommenced="0" guid="_26730611-d93f-44d7-a628-7284f8499051" id="sec.111-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The lease holder may—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2c0103d0-3671-4abd-8a5f-8e6012f0b010" id="sec.111-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">carry out the processing of petroleum in the area of the lease; and</txt></block></li><li guid="_b0aa5d03-b391-488a-a533-a58ba397341f" id="sec.111-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">construct and operate a facility for the processing, storage or transport of petroleum in the area of the lease.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_bacda2ca-43a2-4441-abbe-dce49f9fa2d9" id="sec.111-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.111-ssec.1" target.guid="_26730611-d93f-44d7-a628-7284f8499051">Subsection (1)</intref> applies for petroleum produced in or outside the area.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_dcfdd39f-3274-4da3-905a-cb434f815216" id="sec.111-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_0177c794-7840-4d2b-891f-4668655dc33b" id="sec.111-ssec.3-def.processing_"><txt break.before="1"><defterm guid="_16b0d2ea-5104-4514-99f0-8d1bc189460a" id="sec.111-ssec.3-def.processing" type="definition">processing</defterm> of petroleum—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2960bd6f-e072-49f2-8402-e06359593f3d" id="sec.111-ssec.3-def.processing-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">includes the separation of LPG only if the separation is incidental to other petroleum processing; and</txt></block></li><li guid="_7c2d734c-7376-4c67-a2a6-529562cf81da" id="sec.111-ssec.3-def.processing-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">does not include refining petroleum.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_52568a72-2efd-470d-9a98-e274ea1b47ab" id="sec.111A" provision.type="other" spent.amends="0"><no>111A</no><heading guid="_8abfd47d-31ae-41bc-9387-e50419b2a5a2" id="sec.111A-he">Processing produced water</heading><subclause affected.by.uncommenced="0" guid="_86ac6d01-22c4-4941-833e-ed29bbbfa19c" id="sec.111A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The lease holder may do each of the following in the area of the lease—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5c6c44eb-9ea2-4100-8c98-d979b420bb23" id="sec.111A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">carry out the processing of produced water;</txt></block></li><li guid="_bf16e507-3178-464f-9b03-c3303948f404" id="sec.111A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">construct and operate a facility for the processing and storage of produced water.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_23ad694a-e055-469f-a4c6-d669268110fd" id="sec.111A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.111A-ssec.1" target.guid="_86ac6d01-22c4-4941-833e-ed29bbbfa19c">Subsection (1)</intref> applies for produced water—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3eba0039-4aa8-4cc0-b808-4d575dc263f7" id="sec.111A-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">produced in or outside the area of the lease; and</txt></block></li><li guid="_4672ef56-8499-4b9f-95d5-85a1a1ab03e0" id="sec.111A-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether or not it is produced by the lease holder.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ef0b88fa-fe95-4210-8795-1b6160f57765" id="sec.111A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_74c2c29e-e51f-4dca-bdaf-330e18941693" id="sec.111A-ssec.3-def.processing_"><txt break.before="1"><defterm guid="_e590094d-136f-4c1a-b547-111f5b81eb14" id="sec.111A-ssec.3-def.processing" type="definition">processing</defterm> of produced water includes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c31d00b6-1592-4e37-b520-21e19934eceb" id="sec.111A-ssec.3-def.processing-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">treating produced water; and</txt></block></li><li guid="_a776a025-7d74-4b27-9173-6c8516d3f000" id="sec.111A-ssec.3-def.processing-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">applying mechanical or chemical processes, or energy, to produced water.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_731440f8-db42-45db-bf1c-fcf7ac5289b1" id="sec.112" provision.type="other" spent.amends="0"><no>112</no><heading guid="_8f69ffac-e7f8-4ae4-972e-7e3b1add85b2" id="sec.112-he">Incidental activities</heading><subclause affected.by.uncommenced="0" guid="_f2eda0e4-b614-4a32-8340-abd3258e76be" id="sec.112-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The lease holder may carry out an activity (an <defterm guid="_61d6164a-15ce-4082-9d52-61ff71a09526" id="sec.112-def.incidentalactivity" type="definition">incidental activity</defterm>) in the area of the lease if carrying out the activity is reasonably necessary for, or incidental to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b8649dd6-eb3c-4625-9ff9-76a447ba4b8e" id="sec.112-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">another authorised activity for the lease; or</txt></block></li><li guid="_b1630c93-77d1-49f9-a318-7f3cbea7e13d" id="sec.112-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an authorised activity for another petroleum lease or an authority to prospect.</txt></block></li></list><note guid="_3c4caa62-cc18-4785-91c0-01c7aeab1fc5" id="sec.112-ssec.1-note" type="example"><heading guid="_db2de97e-dd48-4885-9985-c8c1614a36f5" id="sec.112-ssec.1-note-he">Examples of incidental activities—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_d3a1d870-4b92-4f3e-8716-482c26b1396b" id="sec.112-ssec.1-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">constructing or operating plant or works, including, for example, communication systems, compressors, powerlines, pumping stations, reservoirs, roads, evaporation or storage ponds and tanks</txt></block></li><li guid="_fc50bc2e-1d0c-44c4-a38c-9b3ff2ebcd67" id="sec.112-ssec.1-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">constructing or using temporary structures or structures of an industrial or technical nature, including, for example, mobile and temporary camps</txt></block></li><li guid="_4c576ad5-dd78-4352-a032-896138a837e7" id="sec.112-ssec.1-note-para1.3" provision.type="other"><no>3</no><block><txt break.before="0">removing vegetation for, or for the safety of, exploration or testing under <intref check="valid" refid="sec.150A" target.guid="_28d5e4f1-45d3-4468-a0c8-c40686dec0cf">section 150A</intref><intref check="valid" refid="sec.150A-ssec.1" target.guid="_7a693512-7345-4f9e-ac80-1584a769390b">(1)</intref> or <intref check="valid" refid="sec.150C" target.guid="_c8284da4-5701-4f54-ade5-52a0612f7e9d">150C</intref><intref check="valid" refid="sec.150C-ssec.1" target.guid="_0e19e5ef-f14f-4c97-b6ce-066dc1b7c325">(1)</intref></txt></block></li></list></block></note><note guid="_91eaf49a-29e4-44d3-8054-0018a5737951" id="sec.112-ssec.1-note-oc.2" type="example"><heading guid="_0700ac33-2f87-4530-b6a8-f8da4d04a0fa" id="sec.112-ssec.1-note-oc.2-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="ch.2-pt.10" target.guid="_6f7f9284-5836-4486-b63b-35e219633886">part 10</intref>, <intref check="valid" refid="sec.239" target.guid="_b46a1dd4-f56f-45f1-8398-76293aeff39e">section 239</intref>, <intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref> and <intref check="valid" refid="sec.20" target.guid="_746e989f-44f2-4d9b-9550-13495b74b131">section 20</intref><intref check="valid" refid="sec.20-ssec.2" target.guid="_6716699a-7cd3-4f35-945e-49a35a3ccdd3">(2)</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_3e2cd389-ef60-42fc-a9fe-db1b92a5ace9" id="sec.112-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, constructing or using a structure, other than a temporary structure, for office or residential accommodation is not an incidental activity.</txt><note guid="_7fd2af8a-e2d5-4fec-9aaf-f5c9bc6e65ba" id="sec.112-ssec.2-note" type="example"><heading guid="_b02819e6-3635-4f6c-99a2-08141afa14f0" id="sec.112-ssec.2-note-he">Note—</heading><block><txt break.before="1">For development generally, see the <legref check="valid" jurisd="QLD" target.doc.id="act-2016-025" target.version.series="d4a7e9d3-f73d-48a3-9459-9be0b66a1c15" type="act"><name emphasis="yes">Planning Act 2016</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-2016-025" target.guid="_42229283-823c-4a26-99f7-756eab8a5578" target.version.series="d4a7e9d3-f73d-48a3-9459-9be0b66a1c15" type="act">chapter 3</legref>.</txt></block></note></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_d18d52c1-b688-40bb-8269-e5ff8e40675d" id="ch.2-pt.2-div.1-sdiv.2"><no>Subdivision 2</no><heading guid="_f8c0a4f7-4ab3-4638-9196-8a4152466f47" id="ch.2-pt.2-div.1-sdiv.2-he">Provisions for coextensive natural underground reservoirs</heading><clause affected.by.uncommenced="0" guid="_5fe4d62a-9b48-497e-bfcb-3f341fa79321" id="sec.113" provision.type="other" spent.amends="0"><no>113</no><heading guid="_537f09d7-9f27-400f-8f65-b1e726e22f03" id="sec.113-he">Application of <intref check="valid" refid="ch.2-pt.2-div.1-sdiv.2" target.guid="_d18d52c1-b688-40bb-8269-e5ff8e40675d">sdiv 2</intref></heading><block><txt break.before="1">This subdivision applies if a natural underground reservoir in the area of a petroleum lease extends to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9b8db646-7a9f-417d-aa3e-63d2ef2992b5" id="sec.113-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the area of an adjacent petroleum lease or coal or oil shale mining lease (an <defterm guid="_687d7512-e93d-4f84-b4cd-9bd40b0ae1e0" id="sec.113-def.adjacentlease" type="definition">adjacent lease</defterm>); or</txt></block></li><li guid="_a7b3c7ca-7e46-413e-8004-1b97947265e0" id="sec.113-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if a person has applied for a petroleum lease, coal mining lease or oil shale mining lease that will, if granted, be an adjacent lease—the area of the proposed lease.</txt></block></li></list><note guid="_6ccbd023-2b03-44e0-b1e0-b450bcdb3673" id="sec.113-note" type="example"><heading guid="_9837124b-53bf-428f-b8ea-59395aac7a9a" id="sec.113-note-he">Note—</heading><block><txt break.before="1">See also <intref check="invalid" refid="sec.52A">section 52A</intref> (Application of 2004 Act provisions about coextensive natural underground reservoirs) of the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>.</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_77d44076-98f2-49ce-8f51-bbea9a6a675e" id="sec.114" provision.type="other" spent.amends="0"><no>114</no><heading guid="_3b44eeb9-d480-40ee-af39-683c805f1330" id="sec.114-he">Coordination arrangement may be made about mining or production from reservoir</heading><block><txt break.before="1">The petroleum lease holder and an adjacent lease holder, or proposed adjacent lease holder, may make a coordination arrangement that provides for the petroleum that can, under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref> or this Act, be produced from the reservoir from within the area of the petroleum lease and the adjacent lease, or proposed adjacent lease.</txt><note guid="_088106b8-d860-4a60-862b-53e95d075473" id="sec.114-note" type="example"><heading guid="_14d71091-0d8b-4f08-873a-192d6f3a3f4c" id="sec.114-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_94346181-0f0e-4647-8344-817bf92c635b" id="sec.114-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">See the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.318CM" target.doc.id="act-1989-110" target.guid="_c4cd0783-ee07-423e-9341-195a04b0637e" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 318CM</legref> (Limited entitlement to mine coal seam gas).</txt></block></li><li guid="_751ed356-5d46-4890-98cd-2fe6fe984ad0" id="sec.114-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">For the making of coordination arrangements, see <intref check="valid" refid="ch.2-pt.8" target.guid="_286032e7-1db3-499a-b6fd-867e46143006">part 8</intref>.</txt></block></li></list></block></note></block></clause><clause affected.by.uncommenced="0" guid="_8e46dc6b-146a-4c35-8ccb-c434cbf12192" id="sec.115" provision.type="other" spent.amends="0"><no>115</no><heading guid="_a56485e9-476b-42d2-a64b-3ed05a631dac" id="sec.115-he">Restriction on carrying out particular authorised activities</heading><subclause affected.by.uncommenced="0" guid="_5a23692f-faa5-4ea6-947c-880230efc183" id="sec.115-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The petroleum lease holder must not carry out a relevant activity for an adjacent lease or proposed adjacent lease unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_28b07037-f65b-4bea-b8fa-5e06760cda6f" id="sec.115-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the adjacent lease holder, or the proposed adjacent lease holder, has consented in writing to the carrying out of the activity; or</txt></block></li><li guid="_206a96de-f308-4801-a14d-360b1414e833" id="sec.115-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the activity is carried out under—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5f2e6e5c-8d15-4ed1-b546-d4de94bf9210" id="sec.115-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a coordination arrangement mentioned in <intref check="valid" refid="sec.114" target.guid="_77d44076-98f2-49ce-8f51-bbea9a6a675e">section 114</intref>; or</txt></block></li><li guid="_9b74d395-0620-420a-ac3c-a24189328f8a" id="sec.115-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a decision of the Land Court under <intref check="valid" refid="sec.116" target.guid="_7d294fd1-3744-4653-aa38-77bb2cb14090">section 116</intref>.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b2af72f4-bb35-4a10-a007-9862dd5f777a" id="sec.115-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if the adjacent lease was granted after the petroleum lease was granted and, when the adjacent lease was granted, the petroleum lease holder was carrying out the relevant activity, <intref check="valid" refid="sec.115-ssec.1" target.guid="_5a23692f-faa5-4ea6-947c-880230efc183">subsection (1)</intref> does not apply to the petroleum lease holder until the later of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_56ade08d-e940-4042-b367-b4b92e521164" id="sec.115-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">6 months after granting of the adjacent lease;</txt></block></li><li guid="_e326fd20-01ce-4247-ad77-39db9fd66781" id="sec.115-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if within the 6 months the petroleum lease holder applies to the Land Court under <intref check="valid" refid="sec.116" target.guid="_7d294fd1-3744-4653-aa38-77bb2cb14090">section 116</intref>—when the Land Court decides the application.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3f6d3a57-4d9c-4f95-855b-58f52839e6c4" id="sec.115-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_77a6fd34-84da-476b-bbb6-7edb9253c143" id="sec.115-ssec.3-def.relevantactivity_"><txt break.before="1"><defterm guid="_f090f58f-b9ca-4c76-8b1e-ddafd9b72b43" id="sec.115-ssec.3-def.relevantactivity" type="definition">relevant activity</defterm>, for an adjacent lease or proposed adjacent lease, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f63dde82-38e6-41e0-b6c7-047c635338b2" id="sec.115-ssec.3-def.relevantactivity-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the production, under the petroleum lease, of petroleum that comes, or is likely to come, from the part of the reservoir that is in the area of an adjacent lease or the proposed adjacent lease; or</txt></block></li><li guid="_9621ae7e-1b77-42af-9bb1-e6d3b67834dd" id="sec.115-ssec.3-def.relevantactivity-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">another authorised activity under the petroleum lease that physically adversely affects, or may physically adversely affect, the carrying out of authorised activities under an adjacent lease or the proposed adjacent lease.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7d294fd1-3744-4653-aa38-77bb2cb14090" id="sec.116" provision.type="other" spent.amends="0"><no>116</no><heading guid="_2d93cf03-59cf-4895-b521-8ba045d7bd0a" id="sec.116-he">Dispute resolution by Land Court</heading><subclause affected.by.uncommenced="0" guid="_4fc0d356-f840-46bb-808b-411299ac7c0e" id="sec.116-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_de80b3da-1d76-47a4-81e9-31c850a77d3c" id="sec.116-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an adjacent lease holder, or the proposed adjacent lease holder, has not consented in writing to the carrying out of a relevant activity under <intref check="valid" refid="sec.115" target.guid="_8e46dc6b-146a-4c35-8ccb-c434cbf12192">section 115</intref>; and</txt></block></li><li guid="_6bf192fc-75b8-46d3-94de-92c55b4752e2" id="sec.116-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the petroleum lease holder and the adjacent lease holder or proposed adjacent lease holder (the <defterm guid="_e0256c4b-c8e4-4d9b-809d-b063ad08788f" id="sec.116-ssec.1-def.parties" type="definition">parties</defterm>) have not made a coordination arrangement mentioned in <intref check="valid" refid="sec.114" target.guid="_77d44076-98f2-49ce-8f51-bbea9a6a675e">section 114</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3050f67d-36c7-45fb-829a-44c511b2ef78" id="sec.116-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Either party may apply to the Land Court for it to decide—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e5cbe2e8-319e-4b5d-a4f1-e2a777194b8c" id="sec.116-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the amount or proportion of petroleum mentioned in <intref check="valid" refid="sec.114" target.guid="_77d44076-98f2-49ce-8f51-bbea9a6a675e">section 114</intref> that, when produced, is owned by each party; and</txt></block></li><li guid="_71a26b52-930f-4881-a638-fca735688ad9" id="sec.116-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">how the parties are to bear the costs of the production; and</txt></block></li><li guid="_b7e8a1b4-e93c-4397-bbb3-3aee22a0a2c0" id="sec.116-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">how the production is to be coordinated or monitored; and</txt><note guid="_df75da40-195a-4591-a70a-42519b46e349" id="sec.116-ssec.2-para1.c-note" type="example"><heading guid="_e00ac884-2310-4f62-9392-9aca3c369d7f" id="sec.116-ssec.2-para1.c-note-he">Example for <intref check="valid" refid="sec.116-ssec.2-para1.c" target.guid="_b7e8a1b4-e93c-4397-bbb3-3aee22a0a2c0">paragraph (c)</intref>—</heading><block><txt break.before="1">fixing a minimum distance from the boundary between the petroleum lease and the adjacent lease for petroleum production from the reservoir under the petroleum lease</txt></block></note></block></li><li guid="_446b7ffe-71be-4ee7-80a5-7bc651102ad4" id="sec.116-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">remediation requirements, as prescribed under a regulation, in relation to the matters mentioned in <intref check="valid" refid="sec.115" target.guid="_8e46dc6b-146a-4c35-8ccb-c434cbf12192">section 115</intref><intref check="valid" refid="sec.115-ssec.3" target.guid="_3f6d3a57-4d9c-4f95-855b-58f52839e6c4">(3)</intref>, definition <defterm guid="_dda6403f-d7b8-484c-abd7-5d4db832af72" type="mention">relevant activity</defterm>, <intref check="valid" refid="sec.116-ssec.2-para1.b" target.guid="_71a26b52-930f-4881-a638-fca735688ad9">paragraph (b)</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_55788f69-6bd7-450b-ab3a-eb1db79291a0" id="sec.116-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the adjacent lease was granted after the petroleum lease was granted, the decision may apply from the grant of the adjacent lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_816c4160-043e-49fb-a029-59845f1dc39a" id="sec.116-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In making the decision, the Land Court—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8c4bbc88-5a9c-49e1-9805-c0b1f60f1352" id="sec.116-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must consider whether the safety of production activities on any adjoining mining or petroleum lease would be compromised; and</txt></block></li><li guid="_f93e24c1-b132-49f7-bafc-9bc204330608" id="sec.116-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">must attempt to optimise petroleum production under the petroleum lease and mining or production under the adjacent lease in a way that maximises the benefit for all Queenslanders; and</txt></block></li><li guid="_71db4b50-bc54-4c81-a1a7-34251f02f7d8" id="sec.116-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">may make the decision without having regard to the issue of who would have, under another Act or law, otherwise owned the petroleum.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3e0c168e-98f0-42ab-b191-f7afbf1269f8" id="sec.116-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In considering the benefit to all Queenslanders, the Land Court must have regard to the public interest.</txt></block></subclause></clause></subdivision></division><division affected.by.uncommenced="0" guid="_3fb4383f-3f81-4aa6-b3a5-b4e62287dd47" id="ch.2-pt.2-div.2"><no>Division 2</no><heading guid="_79299ff3-8248-4bc1-8799-17ccf1c1f212" id="ch.2-pt.2-div.2-he">Transition from authority to prospect to petroleum lease</heading><subdivision affected.by.uncommenced="0" guid="_e4fcbafc-e9ef-4e5a-b92f-d3d3495e28dc" id="ch.2-pt.2-div.2-sdiv.1"><no>Subdivision 1</no><heading guid="_51c7cde4-df8e-4769-850f-a28743dc0c08" id="ch.2-pt.2-div.2-sdiv.1-he">Applying for petroleum lease</heading><clause affected.by.uncommenced="0" guid="_3f8f9173-3607-43d2-a692-aa8f1a2489e8" id="sec.117" provision.type="other" spent.amends="0"><no>117</no><heading guid="_8972c0c2-10d3-456f-82a3-f348360b5ef4" id="sec.117-he">Who may apply</heading><subclause affected.by.uncommenced="0" guid="_bc90a982-511a-41f2-9ce0-051dbb56a5f9" id="sec.117-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An authority to prospect holder or a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP holder may apply for a petroleum lease over all or part of the area of the authority.</txt><note guid="_71238614-7cbd-4881-99c4-c29021de3289" id="sec.117-ssec.1-note" type="example"><heading guid="_38edcb16-193a-4051-b005-e10afc5603da" id="sec.117-ssec.1-note-he">Note—</heading><block><txt break.before="1">For inclusion of acquired land that was previously in the authority to prospect’s or <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP’s area, see <intref check="valid" refid="sec.30AC" target.guid="_9f663574-cdda-4e64-9f8f-6c6102041022">section 30AC</intref><intref check="valid" refid="sec.30AC-ssec.3" target.guid="_75f7d590-62c4-4ad0-89d9-66d823de1e55">(3)</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_206bc94c-60fb-4f15-890c-e84bcde2bcf3" id="sec.117-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Also, a person other than the holder may apply for the lease—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bad55a15-1b0e-417a-8a5a-78913b6c61de" id="sec.117-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">jointly with the holder; or</txt></block></li><li guid="_49d24a3a-365d-4ec0-8ae5-dc42096ad389" id="sec.117-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">with the holder’s consent.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_22ce6483-aeed-4497-b6e2-98016e1dd59b" id="sec.117-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">An application under this section is an <defterm guid="_6bdc038c-158c-432c-8687-c72ca8a6f2e1" id="sec.117-def.ATPrelatedapplication" type="definition">ATP-related application</defterm>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b88b4157-85c9-434a-b055-16b32f32d149" id="sec.118" provision.type="other" spent.amends="0"><no>118</no><heading guid="_eb6559dc-f519-4cda-ac19-fd4777de6f4f" id="sec.118-he">Requirements for making ATP-related application</heading><block><txt break.before="1">An ATP-related application must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a2b28a4d-d170-41a0-9a6d-bfcae3ac4f19" id="sec.118-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li guid="_d12f3525-290d-46fe-8efb-b96573c2fc76" id="sec.118-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">address the capability criteria; and</txt></block></li><li guid="_e529dd53-75d4-4d0b-bb54-5c70b98b1c4b" id="sec.118-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">include each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_90a61382-5987-47b2-8ea5-b932be28dd22" id="sec.118-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a statement about why the size of the proposed area of the proposed petroleum lease is appropriate for authorised activities under the lease;</txt></block></li><li guid="_8dfefc55-c8c2-474a-84f8-ecbb3f2e00e0" id="sec.118-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">information about the matter under <intref check="valid" refid="sec.121" target.guid="_7ba300a7-78fd-4831-8fe2-a3dc6ea79cf0">section 121</intref><intref check="valid" refid="sec.121-ssec.2" target.guid="_389d0935-b466-43dd-a2a8-7c97fc8edd04">(2)</intref> on which the applicant seeks to rely to establish the requirements for the grant;</txt></block></li><li guid="_2b6e4134-7e47-4c02-b9ea-4c4c48ff9c3f" id="sec.118-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">a proposed development plan that complies with the initial development plan requirements; and</txt></block></li></list></block></li><li guid="_fa03f102-36f9-41b3-ac13-5c9927c5211c" id="sec.118-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">include information to satisfy the requirements for grant mentioned in <intref check="valid" refid="sec.121" target.guid="_7ba300a7-78fd-4831-8fe2-a3dc6ea79cf0">section 121</intref>; and</txt></block></li><li guid="_a5d31549-15c6-4e10-a486-7e5c9c596349" id="sec.118-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">if the proposed authorised activities relate to petroleum production—include a statement by a suitably qualified person that the proposed area contains commercial quantities of petroleum; and</txt></block></li><li guid="_d4a32db0-9087-4964-8f79-1a0375331189" id="sec.118-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">be accompanied by the fee prescribed under a regulation.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" change="ins" guid="_ab5e3633-2e06-439a-9653-f3d7df6f3331" id="sec.118A" provision.type="other" spent.amends="0"><no>118A </no><heading guid="_9bbed215-9d82-4f82-8f35-c93671dfce28" id="sec.118A-he">Rejection of ATP-related application if applicant disqualified</heading><subclause affected.by.uncommenced="0" guid="_39de391b-579e-4f9d-8792-ff67e2827c39" id="sec.118A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister must reject an ATP-related application for a petroleum lease if the Minister decides the applicant is disqualified under the Common Provisions Act, chapter 7 from being granted the petroleum lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_41f85c6e-a999-411c-bc72-f12eb5484511" id="sec.118A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On rejection of the application, the Minister must give the applicant a notice about the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_be057a05-7430-4fa3-a7d6-81bf05cb24f4" id="sec.119" provision.type="other" spent.amends="0"><no>119</no><heading guid="_774da807-96c6-4515-b9bf-cbae1d0f74ed" id="sec.119-he">Continuing effect of authority to prospect for ATP-related application</heading><subclause affected.by.uncommenced="0" guid="_b5b52f9b-078f-4b29-b7bd-1d5eabe7a56e" id="sec.119-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, other than for <intref check="valid" refid="sec.119-ssec.2" target.guid="_b13f1625-dffb-489b-8646-a6c2a789223f">subsection (2)</intref>, the relevant authority to prospect would, other than by cancellation under this Act, end before the ATP-related application is decided.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b13f1625-dffb-489b-8646-a6c2a789223f" id="sec.119-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The authority continues in force in relation to the area the subject of the application until the earlier of the following to happen—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a3574085-c411-4687-863c-61cd9bb65500" id="sec.119-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the start of the term of the petroleum lease;</txt></block></li><li guid="_4373c5d8-a9e9-4520-9399-0d529568af32" id="sec.119-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a refusal of the ATP-related application takes effect;</txt></block></li><li guid="_d8b333cc-de1a-40f1-aae1-4a172ea52039" id="sec.119-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the application is withdrawn.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_338a71f9-7b91-4bc1-be34-755893cf92bb" id="sec.119-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Despite any ending of the program period for the current work program for the authority—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d43a5d18-12f2-4b4b-9310-bb88ade63892" id="sec.119-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the authority is taken to have a work program; and</txt></block></li><li guid="_6d7c8cac-472c-498f-ba30-13e950f85491" id="sec.119-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder may carry out any authorised activity for the authority.</txt></block></li></list></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_28220dd0-e45d-4b85-a6d7-a2614a442a7a" id="ch.2-pt.2-div.2-sdiv.2"><no>Subdivision 2</no><heading guid="_85808164-749f-4e58-a250-34fb7e8b2b73" id="ch.2-pt.2-div.2-sdiv.2-he">Deciding ATP-related applications</heading><clause affected.by.uncommenced="0" guid="_ca27be89-b993-4627-be10-da97814de1d8" id="sec.120" provision.type="other" spent.amends="0"><no>120</no><heading guid="_ab1c553c-1bcc-4bde-9e1f-137817679ae5" id="sec.120-he">Right to grant if requirements for grant met</heading><subclause affected.by.uncommenced="0" guid="_86ebe69e-3a38-4d1c-afcb-84e4fd1c3a2f" id="sec.120-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.122" target.guid="_ba2777bb-ef73-437f-8969-ab2ea172cf2f">sections 122</intref> and <intref check="valid" refid="sec.123A" target.guid="_e11b7e6e-60f4-4d1f-bb32-466583b6d972">123A</intref>, the Minister must grant the petroleum lease if the Minister is satisfied the requirements mentioned in <intref check="valid" refid="sec.121" target.guid="_7ba300a7-78fd-4831-8fe2-a3dc6ea79cf0">section 121</intref> (the <defterm guid="_0bd4f6cf-4e8d-46b3-b5c6-c0c4f1936750" id="sec.120-def.requirementsforgrant" type="definition">requirements for grant</defterm>) have been complied with.</txt><note guid="_462fc42a-ef3d-4066-b0f8-2d7a2a9d5f2e" id="sec.120-ssec.1-note" type="example"><heading guid="_d477ff4b-b88e-4cb6-a6bb-d12383e215e9" id="sec.120-ssec.1-note-he">Note—</heading><block><txt break.before="1">If the application relates to acquired land that was previously in the relevant authority to prospect’s or <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP’s area, see also <intref check="valid" refid="sec.30AC" target.guid="_9f663574-cdda-4e64-9f8f-6c6102041022">section 30AC</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_f4df3c01-d325-423c-bf26-ecf0fb0ed5b4" id="sec.120-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The lease must be refused if the Minister is not satisfied any requirement for grant, other than the requirement mentioned <intref check="valid" refid="sec.121" target.guid="_7ba300a7-78fd-4831-8fe2-a3dc6ea79cf0">section 121</intref><intref check="valid" refid="sec.121-ssec.1" target.guid="_2bef5596-0ba8-4bb3-bdca-b2ac997bf3e2">(1)</intref><intref check="valid" refid="sec.121-ssec.1-para1.c" target.guid="_fd2f9979-f0d2-46b1-9041-e702453d6e6b">(c)</intref>, has been complied with.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a1f8d482-74c8-40ee-9698-08d5f4ac81e9" id="sec.120-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the Minister is satisfied the requirements for grant, other than the requirement mentioned <intref check="valid" refid="sec.121" target.guid="_7ba300a7-78fd-4831-8fe2-a3dc6ea79cf0">section 121</intref><intref check="valid" refid="sec.121-ssec.1" target.guid="_2bef5596-0ba8-4bb3-bdca-b2ac997bf3e2">(1)</intref><intref check="valid" refid="sec.121-ssec.1-para1.c" target.guid="_fd2f9979-f0d2-46b1-9041-e702453d6e6b">(c)</intref>, have been complied with, the Minister may grant the lease.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7ba300a7-78fd-4831-8fe2-a3dc6ea79cf0" id="sec.121" provision.type="other" spent.amends="0"><no>121</no><heading guid="_704a677f-7a84-4b7f-b0ef-36a6de965574" id="sec.121-he">Requirements for grant</heading><subclause affected.by.uncommenced="0" guid="_2bef5596-0ba8-4bb3-bdca-b2ac997bf3e2" id="sec.121-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The requirements for grant are each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_52385b74-b5e2-4635-b340-c7e04256737e" id="sec.121-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the applicant is an eligible person;</txt></block></li><li guid="_19bff672-7599-447b-9274-3acfaffe8207" id="sec.121-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the proposed area of the proposed petroleum lease—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e4bb66b8-f16a-4a4f-80c2-84e726059372" id="sec.121-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">is appropriate for the authorised activities proposed to be carried out; and</txt></block></li><li guid="_5302b61e-040a-4861-ab48-44dd1188227b" id="sec.121-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the authorised activities relate to petroleum production—contains commercial quantities of petroleum; and</txt></block></li><li guid="_fe812989-90fd-480a-a0ef-e1dcf0e96c6d" id="sec.121-ssec.1-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">if the authorised activities relate to storage of petroleum or a prescribed storage gas—contains an adequately identified natural underground reservoir that is adequate for the proposed purpose of the lease;</txt></block></li></list></block></li><li guid="_fd2f9979-f0d2-46b1-9041-e702453d6e6b" id="sec.121-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the conditions of the relevant authority to prospect have been substantially complied with;</txt></block></li><li guid="_7f353e87-f501-42e8-be60-c2f419ac89ae" id="sec.121-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the Minister has approved the applicant’s proposed initial development plan for the lease;</txt></block></li><li guid="_d20c01e0-ea61-410b-b9f6-228deee2dd7f" id="sec.121-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the Minister is of the opinion that the applicant is capable of carrying out authorised activities for the lease, having regard to the applicant’s—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6e1095fc-c086-401e-b6f9-c1eb48ce1359" id="sec.121-ssec.1-para1.e-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">financial and technical resources; and</txt></block></li><li guid="_432df537-e894-4059-b5a0-093b8b988130" id="sec.121-ssec.1-para1.e-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">ability to manage petroleum exploration and production;</txt></block></li></list></block></li><li guid="_09440959-c001-41d1-808c-b92dc04ca82e" id="sec.121-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">a relevant environmental authority for the lease has been issued;</txt></block></li><li guid="_eb3333c0-9e2f-4968-ab79-ec44b6f400b6" id="sec.121-ssec.1-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">the applicant has established 1 of the matters mentioned in <intref check="valid" refid="sec.121-ssec.2" target.guid="_389d0935-b466-43dd-a2a8-7c97fc8edd04">subsection (2)</intref>;</txt></block></li><li guid="_664b4050-4bea-41a5-91e3-36546f0cc337" id="sec.121-ssec.1-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">the applicant has paid the annual rent for the first year of the proposed lease;</txt></block></li><li guid="_7e00eaaf-bc14-407d-8da7-7d6f0476640c" id="sec.121-ssec.1-para1.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the applicant has given, under <intref check="valid" refid="sec.488" target.guid="_13f8de44-15a4-4a47-a9af-6464bc374dda">section 488</intref>, security for the lease.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_389d0935-b466-43dd-a2a8-7c97fc8edd04" id="sec.121-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.121-ssec.1" target.guid="_2bef5596-0ba8-4bb3-bdca-b2ac997bf3e2">subsection (1)</intref><intref check="valid" refid="sec.121-ssec.1-para1.g" target.guid="_eb3333c0-9e2f-4968-ab79-ec44b6f400b6">(g)</intref>, the matters are any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9d0f3e3d-87c6-41dc-9ac8-55ce9519fee7" id="sec.121-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">commercial petroleum production in the area of the lease is, or is likely, within 2 years after the lease is to take effect;</txt></block></li><li guid="_65562ba1-f712-45fe-adfe-9c74a87f9152" id="sec.121-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the applicant has—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_63c8fbee-3be9-4ace-af65-03803910268e" id="sec.121-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">entered into a contract, coordination arrangement or other arrangement (a <defterm guid="_5c3f87c5-8590-4506-a1ca-f49b5167bc9d" id="sec.121-ssec.2-para1.b-def.relevantarrangement" type="definition">relevant arrangement</defterm>) to supply petroleum produced from the area of the lease; and</txt></block></li><li guid="_c750b122-08e6-4541-ae86-78d228e5656a" id="sec.121-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">lodged a written declaration that the petroleum produced from the area of the lease will meet all or some of the petroleum required to be supplied under the relevant arrangement;</txt></block></li></list></block></li><li guid="_121d8112-9ce7-439b-ab86-38251f0c8c06" id="sec.121-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the area of the lease is suitable for underground storage of petroleum or a prescribed storage gas and the storage will, or is likely to, start before the later of the following to happen—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f0fa5b38-1c15-4506-bc3e-c9b7fe0b3a80" id="sec.121-ssec.2-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the end of 5 years after the lease is to take effect;</txt></block></li><li guid="_5c78d590-c54b-486c-8e88-c8c9c457ad33" id="sec.121-ssec.2-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the end of the plan period for the applicant’s proposed development plan for the lease.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_041785bc-64ce-49de-9951-52cc813e170c" id="sec.121-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The matters mentioned in <intref check="valid" refid="sec.121-ssec.1" target.guid="_2bef5596-0ba8-4bb3-bdca-b2ac997bf3e2">subsection (1)</intref><intref check="valid" refid="sec.121-ssec.1-para1.e" target.guid="_d20c01e0-ea61-410b-b9f6-228deee2dd7f">(e)</intref> are the <defterm guid="_8c9220ec-b54e-4b8c-bac0-6a5336574623" id="sec.121-def.capabilitycriteria" type="definition">capability criteria</defterm>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_81c3c3b3-7971-4083-ae07-6ef3c3b9ab20" id="sec.121-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A person <defterm guid="_25a14451-3062-4f21-836d-00e4699a0ab1" id="sec.121-def.satisfies" type="definition">satisfies</defterm> the capability criteria if the Minister forms the opinion about the person mentioned in <intref check="valid" refid="sec.121-ssec.1" target.guid="_2bef5596-0ba8-4bb3-bdca-b2ac997bf3e2">subsection (1)</intref><intref check="valid" refid="sec.121-ssec.1-para1.e" target.guid="_d20c01e0-ea61-410b-b9f6-228deee2dd7f">(e)</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_ba2777bb-ef73-437f-8969-ab2ea172cf2f" id="sec.122" provision.type="other" spent.amends="0"><no>122</no><heading guid="_8984a83f-b8af-44ad-9ac0-22f369c16b3d" id="sec.122-he">Exception for particular relevant arrangements</heading><block><txt break.before="1">Despite <intref check="valid" refid="sec.120" target.guid="_ca27be89-b993-4627-be10-da97814de1d8">section 120</intref>, the application may be refused if the Minister—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8fc6279f-6afb-43f8-90fd-edac43cec8d9" id="sec.122-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is not satisfied of a matter under <intref check="valid" refid="sec.121" target.guid="_7ba300a7-78fd-4831-8fe2-a3dc6ea79cf0">section 121</intref><intref check="valid" refid="sec.121-ssec.2" target.guid="_389d0935-b466-43dd-a2a8-7c97fc8edd04">(2)</intref><intref check="valid" refid="sec.121-ssec.2-para1.a" target.guid="_9d0f3e3d-87c6-41dc-9ac8-55ce9519fee7">(a)</intref> or <intref check="valid" refid="sec.121-ssec.2-para1.c" target.guid="_121d8112-9ce7-439b-ab86-38251f0c8c06">(c)</intref>; and</txt></block></li><li guid="_c221388a-73db-4d9b-b84e-380f7cbe611f" id="sec.122-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is satisfied the applicant has entered into a relevant arrangement, but the Minister reasonably believes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6c0d265c-a08f-4f5c-b4bb-8506c8265ede" id="sec.122-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the arrangement is not an arms-length commercial transaction; or</txt></block></li><li guid="_e9882fff-54df-41e3-92ed-1a9284b23456" id="sec.122-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">supply under the arrangement is unlikely to be carried out.</txt></block></li></list></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_ef44ece4-3399-4e95-8180-52c9dbb8d1b6" id="sec.123" provision.type="other" spent.amends="0"><no>123</no><heading guid="_96988806-cd1b-4f01-a71a-47b417c2db97" id="sec.123-he">Provisions of petroleum lease</heading><subclause affected.by.uncommenced="0" guid="_7242f5c1-440a-4f4d-a697-ae068db415a1" id="sec.123-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Each petroleum lease must state its term and area.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3bb8e183-f724-417c-93ef-82bc3181e932" id="sec.123-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The term must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b8b52aff-4f0e-4d64-967c-2c381366c4b8" id="sec.123-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be for at least the plan period for the initial development plan for the lease; and</txt></block></li><li guid="_1cff710a-19cd-4d74-ab73-95ce2d1d0875" id="sec.123-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">end no later than 30 years after the lease takes effect.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b5ebfb94-60a1-44eb-aa8e-7e01c9b61fed" id="sec.123-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The lease may also state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ebff0dad-e581-4211-b316-b398db2a111d" id="sec.123-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">conditions or other provisions of the lease, other than conditions or provisions that are—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_223a5f76-98af-4f66-a186-02149c081107" id="sec.123-ssec.3-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">inconsistent with the mandatory conditions for petroleum leases; or</txt></block></li><li guid="_e18ed5c8-0a88-4e63-bd5c-74993f5b56d3" id="sec.123-ssec.3-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the same as, or substantially the same as, or inconsistent with, any relevant environmental condition for the lease; and</txt></block></li></list></block></li><li guid="_9c05c2c0-59f3-41be-97c5-60b34841cc50" id="sec.123-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a day for the lease to take effect; and</txt></block></li><li guid="_9eea8ce9-dcbb-4e86-a376-f47fb5d1a7c0" id="sec.123-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a day by which petroleum production under the lease is to start.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_aaeed9b8-c45c-4cba-a423-47928f9ec8fd" id="sec.123-ssec.3A" provision.type="other"><no>(3A)</no><block><txt break.before="0">The conditions of the lease may include an Australian market supply condition applying to all or part of the area of the lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8b2b1e15-b9ea-41d7-a361-3c96d848b764" id="sec.123-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, the provisions of the lease may exclude or restrict the carrying out of an authorised activity for the lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_98a8228a-5d9f-4aad-821e-8a952d5de9e3" id="sec.123-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The day of effect must not be before the day the lease is granted.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_52ccf9f3-2b87-4a9f-9ff6-e778d7174bfd" id="sec.123-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">If no day of effect is decided, the lease takes effect on the day it is granted.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7503b903-4657-4a5c-9ffd-2820414d3966" id="sec.123-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">The production commencement day may be more than 2 years after the day of effect only if the Minister is satisfied the holder has entered into a relevant arrangement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_60d45d5c-0dc1-46bf-a9c0-168a02c6a059" id="sec.123-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">The matters that must be considered in deciding the provisions of the lease include the development plan criteria and capability criteria.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ee5cdad5-89ae-4097-9374-1caa7c33192f" id="sec.123-ssec.9" provision.type="other"><no>(9)</no><block><txt break.before="0">This section applies subject to <intref check="valid" refid="sec.123A" target.guid="_e11b7e6e-60f4-4d1f-bb32-466583b6d972">section 123A</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e11b7e6e-60f4-4d1f-bb32-466583b6d972" id="sec.123A" provision.type="other" spent.amends="0"><no>123A</no><heading guid="_4cf21577-285c-4d44-9b5d-cdaaf66e3dc8" id="sec.123A-he">Provisions about grant and conditions of petroleum lease for coordinated project</heading><subclause affected.by.uncommenced="0" guid="_cd46ae22-2cee-40d1-860b-e76c7a7bf73f" id="sec.123A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a petroleum lease or proposed petroleum lease is for a coordinated project.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_57a75b03-2a06-424b-a0fe-be8c9c5bab06" id="sec.123A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister must not grant the lease until the Minister has been given the Coordinator-General’s report for the project.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6bdb7946-c023-479d-96b3-89527e950824" id="sec.123A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Any Coordinator-General’s conditions for the lease must be stated in the lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_aed15319-9e02-48a3-8f53-63d42ed0d46b" id="sec.123A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Any other condition of the lease stated under <intref check="valid" refid="sec.123" target.guid="_ef44ece4-3399-4e95-8180-52c9dbb8d1b6">section 123</intref> must not be inconsistent with the Coordinator-General’s conditions.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_41cfb8c8-7f6f-4cda-8225-e1c68f0b27ee" id="sec.123A-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If a mandatory condition for petroleum leases conflicts with any of the Coordinator-General’s conditions, the Coordinator-General’s condition prevails to the extent of the inconsistency.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2d42767a-f721-4356-a56d-83d11ed4c89e" id="sec.124" provision.type="other" spent.amends="0"><no>124</no><heading guid="_700b2fe7-6eb5-4322-a285-1bd8be59a440" id="sec.124-he">Information notice about refusal</heading><block><txt break.before="1">On refusal of the application, the applicant must be given an information notice about the decision to refuse.</txt><note guid="_1fcd1eef-df8f-4e76-970a-883d327acf24" id="sec.124-note" type="example"><heading guid="_de44fabb-92c6-417d-86e3-e118167d7cf5" id="sec.124-note-he">Note—</heading><block><txt break.before="1">See however <intref check="valid" refid="sec.829" target.guid="_f4d36ba2-bbc3-4115-9b1c-b7ceab1fc765">section 829</intref> (Restriction on Land Court’s powers for decision not to grant petroleum lease).</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_d2329f48-589c-4845-8900-020fb571a68f" id="sec.125" provision.type="other" spent.amends="0"><no>125</no><heading guid="_bd8257d9-64d9-4a9a-8384-99f5a6fc5fd2" id="sec.125-he">When refusal takes effect</heading><block><txt break.before="1">A refusal of the application does not take effect until the end of the appeal period for the decision to refuse.</txt></block></clause></subdivision></division><division affected.by.uncommenced="0" guid="_3b5770ea-b764-424b-ad14-1c1ac1d42210" id="ch.2-pt.2-div.3"><no>Division 3</no><heading guid="_134f0e5a-8cc4-4b80-bd44-759418d29f0a" id="ch.2-pt.2-div.3-he">Obtaining petroleum lease by competitive tender</heading><subdivision affected.by.uncommenced="0" guid="_46971443-ea2c-4ed2-94c2-d40e30440e5e" id="ch.2-pt.2-div.3-sdiv.1"><no>Subdivision 1</no><heading guid="_67d2d75a-93f3-46f4-8c41-a1d86b2e88ef" id="ch.2-pt.2-div.3-sdiv.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_a7810e7e-67b0-4877-9d60-665dcdca732f" id="sec.126" provision.type="other" spent.amends="0"><no>126</no><heading guid="_db59ecf8-5839-41fa-9e41-587799d257fb" id="sec.126-he">Operation of <intref check="valid" refid="ch.2-pt.2-div.3" target.guid="_3b5770ea-b764-424b-ad14-1c1ac1d42210">div 3</intref></heading><subclause affected.by.uncommenced="0" guid="_fb6d8674-cc11-4716-9528-64a9d3b6f857" id="sec.126-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This division provides for a process for the granting of petroleum leases by competitive tender.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a6a9c546-5092-41bf-aa69-00fc4cd4b873" id="sec.126-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">To remove any doubt, it is declared that a petroleum lease can only be granted under this division, <intref check="valid" refid="ch.2-pt.2-div.2" target.guid="_3fb4383f-3f81-4aa6-b3a5-b4e62287dd47">division 2</intref> or <intref check="valid" refid="ch.2-pt.2-div.7" target.guid="_2bb22cfe-e8d5-4c9d-9726-0c2f089841e4">division 7</intref>, <intref check="valid" refid="ch.2-pt.2-div.7-sdiv.2" target.guid="_f21b2cea-3c44-4eb9-9d6e-44d180eaa233">subdivision 2</intref>.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_2778adc5-8723-45c0-acbb-9f25d6e4daa3" id="ch.2-pt.2-div.3-sdiv.2"><no>Subdivision 2</no><heading guid="_6407e3a9-df5b-4da4-bc35-a4b252ec0b8d" id="ch.2-pt.2-div.3-sdiv.2-he">Calls for tenders</heading><clause affected.by.uncommenced="0" guid="_6a587d42-acca-4fdd-9d32-8061b1e8ce8d" id="sec.127" provision.type="other" spent.amends="0"><no>127</no><heading guid="_85e659ec-0e1b-4006-bb2c-286dea8feda9" id="sec.127-he">Call for tenders</heading><subclause affected.by.uncommenced="0" guid="_b1d8f271-efa3-4024-9819-be5d1aa65aa1" id="sec.127-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may publish a notice (a <defterm guid="_b10d5de4-b1e5-4c68-ae2d-3a7cbbb3405f" id="sec.127-def.callfortenders" type="definition">call for tenders</defterm>) inviting tenders for a petroleum lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b1792919-26fe-4492-b0ab-61b6de1e7090" id="sec.127-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The call must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8a41cf5e-ef09-42ff-8e45-933d016d0555" id="sec.127-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the proposed area of the lease; and</txt></block></li><li guid="_22b815bb-7440-4703-b6a1-7df4cabbd9fc" id="sec.127-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that, under <intref check="valid" refid="sec.169" target.guid="_bef303e4-aef4-40e0-ab7b-a57a6df9306e">section 169</intref>, particular land may be excluded land for the lease; and</txt></block></li><li guid="_f9a489ea-35e0-4fcd-a6a8-a91ccabbc1b5" id="sec.127-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the day and time by which tenders in response to it must be made (the <defterm guid="_741c2ee5-6514-413b-99bd-8ccbad96726e" id="sec.127-ssec.2-def.closingtime" type="definition">closing time</defterm> for the call); and</txt></block></li><li guid="_3ae8e2cd-12d5-4cb9-a19b-c97ee263bb6c" id="sec.127-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">that the tenders must be lodged before the closing time for the call; and</txt></block></li><li guid="_eb0aab4f-c520-4d64-937d-65590fbc94e7" id="sec.127-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">that details about each of the following are available at a stated place—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_45cceb19-f2be-4b04-9454-ae4597bcf01c" id="sec.127-ssec.2-para1.e-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">any proposed conditions of the lease, other than mandatory conditions for petroleum leases, that are likely to impact significantly on exploration or production in the proposed area of the lease;</txt></block></li><li guid="_729c3603-be0f-42b8-9f30-fd376d2421aa" id="sec.127-ssec.2-para1.e-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the required plan period for the initial development plan for the lease;</txt></block></li><li guid="_889c44ed-22cf-4231-ba8c-5ff25ff4b224" id="sec.127-ssec.2-para1.e-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">any criteria (<defterm guid="_7be51169-e476-4c64-bd38-fa8dbd653d07" id="sec.127-ssec.2-para1.e-def.specialcriteria" type="definition">special criteria</defterm>), other than the development plan criteria and capability criteria, proposed to be used to decide whether to grant the lease or to decide its provisions;</txt></block></li><li guid="_e9f17fb8-4535-4f82-9ae5-668841fbae33" id="sec.127-ssec.2-para1.e-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">whether a process for appointing a preferred tenderer involving a cash bid component is to be used for deciding the call;</txt></block></li><li guid="_f34d0935-60eb-409d-9120-d1fa766cc32d" id="sec.127-ssec.2-para1.e-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">if any part of the proposed area of the lease is to be subject to an Australian market supply condition—the part of the proposed area and the condition.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_439af27d-c2a8-4080-a16c-3457655def3a" id="sec.127-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The call may state other relevant matters, including, for example, matters relevant to the development plan, capability or special criteria.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b99ad3ce-c389-4274-90c8-5d929423c42e" id="sec.127-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The area of the proposed lease must comply with <intref check="valid" refid="sec.168" target.guid="_734a0050-dc06-4a36-a451-0fd4eeda33ba">section 168</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6ed85e10-b64c-4356-94b9-46b79605f6e1" id="sec.127-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0"><intref check="valid" refid="sec.127-ssec.2" target.guid="_b1792919-26fe-4492-b0ab-61b6de1e7090">Subsection (2)</intref><intref check="valid" refid="sec.127-ssec.2-para1.e" target.guid="_eb0aab4f-c520-4d64-937d-65590fbc94e7">(e)</intref><intref check="valid" refid="sec.127-ssec.2-para1.e-para2.i" target.guid="_45cceb19-f2be-4b04-9454-ae4597bcf01c">(i)</intref> does not limit the power under <intref check="valid" refid="sec.133" target.guid="_3b0b11d3-54f7-4850-acb3-cc23c9dfae7b">section 133</intref> to decide conditions of the lease if it is granted.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a88b77c8-8f2d-484b-8f7e-636c823d15d7" id="sec.128" provision.type="other" spent.amends="0"><no>128</no><heading guid="_f3f8a441-2ca0-4e41-9917-5ed7919ab25c" id="sec.128-he">Right to tender</heading><subclause affected.by.uncommenced="0" guid="_adc5a815-4667-4d2b-a402-432b374f9312" id="sec.128-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An eligible person may tender for a proposed petroleum lease the subject of a call for tenders.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_01db51cf-b98c-4db5-8bdb-bc555912394c" id="sec.128-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the tender—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_64ae68c8-5473-4f23-a11f-440502da3379" id="sec.128-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must comply with the requirements under <intref check="valid" refid="sec.118" target.guid="_b88b4157-85c9-434a-b055-16b32f32d149">section 118</intref> for making an ATP-related application; and</txt></block></li><li guid="_e964ad74-4b50-4980-a9f0-ea17c7bcc607" id="sec.128-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">must be lodged; and</txt></block></li><li guid="_450a4b78-2d68-45ac-b624-b9703f246646" id="sec.128-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">can not be made—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8cb0057a-2d4d-4195-887e-8927289ced64" id="sec.128-ssec.2-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">after the closing time for the call; or</txt></block></li><li guid="_e7f8d395-0177-4b6c-88b9-8890e7fc4507" id="sec.128-ssec.2-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">for only part of the area of the proposed petroleum lease.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_cb8e93be-fb56-458a-afff-6afacd8c6e1a" id="sec.128-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, if a process for appointing a preferred tenderer involving a cash bid component is to be used for deciding the call, the tender must be accompanied by the tenderer’s cash bid.</txt></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_bf04440c-c23a-4bf0-815d-5bd9950989b8" id="sec.128A" provision.type="other" spent.amends="0"><no>128A </no><heading guid="_5dbc3432-ac7f-43ba-b813-acdb4e73af47" id="sec.128A-he">Rejection of tender if tenderer disqualified</heading><subclause affected.by.uncommenced="0" guid="_99fe4a13-541d-4008-80ad-e60bf1e7bb5e" id="sec.128A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister must reject a tender for a petroleum lease if the Minister decides the tenderer is disqualified under the Common Provisions Act, chapter 7 from being granted the petroleum lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d0a92c1c-7bcf-4b5c-91cb-92a633365992" id="sec.128A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On rejection of the tender, the Minister must give the tenderer a notice about the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1dbe6b05-4280-4314-ab87-83a1b1a57ab9" id="sec.129" provision.type="other" spent.amends="0"><no>129</no><heading guid="_0137291d-052b-47f6-994d-3fe1431e5bc9" id="sec.129-he">Right to terminate call for tenders</heading><subclause affected.by.uncommenced="0" guid="_86a1bebb-c5ea-4830-ba1f-81124f015cdd" id="sec.129-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may, by gazette notice, terminate a call for tenders at any time before deciding to grant a petroleum lease to a person who has made a tender in response to the call.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7cf70e1f-feae-4411-a2ea-dedaa6cedd81" id="sec.129-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">All tenders in response to the call lapse when the call is terminated.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_74fd4671-99e3-4242-857a-d73ac0615a72" id="sec.129-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">No amount, whether by way of compensation, reimbursement or otherwise is payable by the State to any person for or in connection with the termination.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_304f35b9-8b15-49ec-a0ef-37affaf0f0ec" id="sec.129-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, subject to <intref check="valid" refid="sec.131" target.guid="_8ca82c5c-e5b8-4ab5-af3e-6fd6c2ee6c22">sections 131</intref><intref check="valid" refid="sec.131-ssec.4" target.guid="_55bfaac2-ab11-4e27-8bd0-f34ae88d5b61">(4)</intref> and <intref check="valid" refid="sec.845" target.guid="_7a1a35a1-f15a-4e0d-9fda-75368645b812">845</intref><intref check="valid" refid="sec.845-ssec.5" target.guid="_13711718-4175-43b1-bc1d-c30c5b869165">(5)</intref>, the Minister must refund any tender security given by the tenderer.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_8bc344c8-b6f5-4883-b50c-fc0fca0710f1" id="ch.2-pt.2-div.3-sdiv.3"><no>Subdivision 3</no><heading guid="_959c013a-9df0-4c84-9b25-566d28e4f6f9" id="ch.2-pt.2-div.3-sdiv.3-he">Deciding tenders</heading><clause affected.by.uncommenced="0" guid="_39ed0f4d-5a72-4cf0-8ddb-886c4da11add" id="sec.130" provision.type="other" spent.amends="0"><no>130</no><heading guid="_5ae9c897-c7d2-4a5b-a33a-29178c6a7fb6" id="sec.130-he">Process for deciding tenders</heading><subclause affected.by.uncommenced="0" guid="_e2f0b7d2-347e-4d26-ab70-72c1c183d52c" id="sec.130-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.134" target.guid="_d5782881-84f3-4e15-b116-bf40b138e426">section 134</intref>, any process the Minister considers appropriate may be used to decide a call for tenders, including, for example—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f82fe4de-30c9-4b3a-88f6-f912103b8576" id="sec.130-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a process appointing a preferred tenderer on the tenders made in response to the call (whether or not involving a cash bid component); or</txt></block></li><li guid="_3b84e1ff-071f-4649-935c-25bafa0fe49d" id="sec.130-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a process involving short-listing a group of possible preferred tenderers and inviting them to engage in another round of tendering before appointing a preferred tenderer from that group.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6ccc0714-d9e3-4410-a76c-0ce5482042d8" id="sec.130-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.130-ssec.1" target.guid="_e2f0b7d2-347e-4d26-ab70-72c1c183d52c">subsection (1)</intref>, the Minister may give a tenderer a notice requiring the tenderer to give the Minister, within the reasonable period stated in the notice, information the Minister reasonably requires to assess the tender.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8ca82c5c-e5b8-4ab5-af3e-6fd6c2ee6c22" id="sec.131" provision.type="other" spent.amends="0"><no>131</no><heading guid="_4f09e5eb-d384-4f5c-bd8c-3f1301f593ab" id="sec.131-he">Provisions for preferred tenderers</heading><subclause affected.by.uncommenced="0" guid="_1fc75ce3-daf4-41ae-8a87-b5768fe0274a" id="sec.131-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may require a preferred tenderer for the call for tenders to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0f86791e-3982-4e79-92fa-4108b7b6f6ac" id="sec.131-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">pay any amounts necessarily incurred, or to be incurred, to enable the petroleum lease to be granted; and</txt><note guid="_8901e0a9-5b93-4a1a-ab31-ab7bce11e055" id="sec.131-ssec.1-para1.a-note" type="example"><heading guid="_de9d3e46-74fb-4706-a320-bc55c264ad42" id="sec.131-ssec.1-para1.a-note-he">Example—</heading><block><txt break.before="1">amounts required to comply with the <legref check="invalid" jurisd="CTH" type="act"><name emphasis="no">Commonwealth Native Title Act</name></legref>, <legref check="invalid" jurisd="CTH" refid="pt.2" type="act">part 2</legref>, <legref check="invalid" jurisd="CTH" refid="pt.2-div.3" type="act">division 3</legref>, subdivision P</txt></block></note></block></li><li guid="_7e3f3ff3-9470-4d25-90d1-5534ee94cf1d" id="sec.131-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to do all or any of the following within a stated reasonable period—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ae3d76c7-5a4e-486a-b28d-91c913e1d650" id="sec.131-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">pay the annual rent for the first year of the lease;</txt></block></li><li guid="_b2915c5e-d096-4cc1-b069-6715bc264347" id="sec.131-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">give security for the lease, as required under <intref check="valid" refid="sec.488" target.guid="_13f8de44-15a4-4a47-a9af-6464bc374dda">section 488</intref>.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f6b3f991-e0b1-45ff-a511-267f70072e9c" id="sec.131-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If a preferred tenderer does not—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_07446348-a0ea-4304-91d2-fc591e2f6453" id="sec.131-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">comply with a requirement under <intref check="valid" refid="sec.131-ssec.1" target.guid="_1fc75ce3-daf4-41ae-8a87-b5768fe0274a">subsection (1)</intref>; or</txt></block></li><li guid="_018f628b-d48c-41a8-9d30-902b65d5f7ac" id="sec.131-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">do all things reasonably necessary to allow a petroleum lease to be granted to the tenderer;</txt></block></li></list></block><block><txt break.before="1">the Minister may revoke the tenderer’s appointment as the preferred tenderer.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3b02c350-0bc0-4495-a3b2-e065213ff97a" id="sec.131-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, before acting under <intref check="valid" refid="sec.131-ssec.2" target.guid="_f6b3f991-e0b1-45ff-a511-267f70072e9c">subsection (2)</intref>, the Minister must give the preferred tenderer a reasonable opportunity to provide reasons for, and rectify, the tenderer’s failure to comply with a requirement under <intref check="valid" refid="sec.131-ssec.1" target.guid="_1fc75ce3-daf4-41ae-8a87-b5768fe0274a">subsection (1)</intref> or <intref check="valid" refid="sec.131-ssec.2" target.guid="_f6b3f991-e0b1-45ff-a511-267f70072e9c">(2)</intref><intref check="valid" refid="sec.131-ssec.2-para1.b" target.guid="_018f628b-d48c-41a8-9d30-902b65d5f7ac">(b)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_55bfaac2-ab11-4e27-8bd0-f34ae88d5b61" id="sec.131-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the Minister revokes the tenderer’s appointment as the preferred tenderer under this section, the Minister may—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fe0e3d81-15d7-4933-a926-b11ab39315d9" id="sec.131-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">retain the whole or part of any tender security given by the tenderer, if the Minister considers it reasonable in the circumstances; and</txt></block></li><li guid="_e4f4262b-3ca0-4016-ae0f-3b6412660544" id="sec.131-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">appoint another tenderer to be the preferred tenderer.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_285753db-9636-4c6a-b5d2-2bed5c49c521" id="sec.132" provision.type="other" spent.amends="0"><no>132</no><heading guid="_36389511-43bf-44e5-9121-406b61055e02" id="sec.132-he">Deciding whether to grant petroleum lease</heading><subclause affected.by.uncommenced="0" guid="_6879075f-175f-4eb1-a1ed-354bcb88b3ea" id="sec.132-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may, after the closing time for the call for tenders—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_56042bba-7f69-4f8e-933d-38188d762218" id="sec.132-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">grant a petroleum lease to 1 tenderer; or</txt></block></li><li guid="_0149e9b5-0ef4-4aee-8dbc-0e0a29aa4c4b" id="sec.132-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">refuse to grant any petroleum lease.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3c95192b-8388-43f0-80a2-897b707c997e" id="sec.132-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3a4db8cd-a81f-440f-ba6d-454443410e4f" id="sec.132-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before deciding to grant the lease, the Minister must decide whether to approve the applicant’s proposed initial development plan for the lease; and</txt></block></li><li guid="_b4f0c3c0-f9f3-489a-b4d6-d987094378cf" id="sec.132-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Minister can not grant the lease unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6f23e692-3aa4-440b-b743-21fec54a41cd" id="sec.132-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the tenderer is an eligible person; and</txt></block></li><li guid="_e14fc630-24aa-4c41-b712-ed06e5bf3cb1" id="sec.132-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the proposed plan has been approved; and</txt></block></li><li guid="_7e60b68e-6f0e-4a71-bfd5-1ec5eccced7e" id="sec.132-ssec.2-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the Minister is satisfied the requirements for grant, other than the requirement mentioned in <intref check="valid" refid="sec.121" target.guid="_7ba300a7-78fd-4831-8fe2-a3dc6ea79cf0">section 121</intref><intref check="valid" refid="sec.121-ssec.1" target.guid="_2bef5596-0ba8-4bb3-bdca-b2ac997bf3e2">(1)</intref><intref check="valid" refid="sec.121-ssec.1-para1.c" target.guid="_fd2f9979-f0d2-46b1-9041-e702453d6e6b">(c)</intref>, have been complied with; and</txt></block></li><li guid="_0dea9dc8-820d-45e3-a493-173d9b037eec" id="sec.132-ssec.2-para1.b-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">a relevant environmental authority for the lease has been issued.</txt></block></li></list></block></li></list><note guid="_a28d5374-fc95-4e75-bc91-fc8ed5a2648a" id="sec.132-ssec.2-note" type="example"><heading guid="_121baa70-33e0-4750-9e3a-634eb44dc4a6" id="sec.132-ssec.2-note-he">Note—</heading><block><txt break.before="1">If a tender relates to acquired land, see also <intref check="valid" refid="sec.30AC" target.guid="_9f663574-cdda-4e64-9f8f-6c6102041022">section 30AC</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_2a3d1037-ce24-4e04-b5d0-dd74f990a7ec" id="sec.132-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">This section applies subject to <intref check="valid" refid="sec.123A" target.guid="_e11b7e6e-60f4-4d1f-bb32-466583b6d972">section 123A</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3b0b11d3-54f7-4850-acb3-cc23c9dfae7b" id="sec.133" provision.type="other" spent.amends="0"><no>133</no><heading guid="_98a1ee37-892e-41ab-8a1a-f30d5a3f18a6" id="sec.133-he">Provisions of petroleum lease</heading><block><txt break.before="1"><intref check="valid" refid="sec.123" target.guid="_ef44ece4-3399-4e95-8180-52c9dbb8d1b6">Sections 123</intref> and <intref check="valid" refid="sec.123A" target.guid="_e11b7e6e-60f4-4d1f-bb32-466583b6d972">123A</intref> apply to a petroleum lease granted under this division as if the tender for the lease was an ATP-related application.</txt></block></clause><clause affected.by.uncommenced="0" guid="_d5782881-84f3-4e15-b116-bf40b138e426" id="sec.134" provision.type="other" spent.amends="0"><no>134</no><heading guid="_8e75770f-b31d-4100-8438-f67999a3f333" id="sec.134-he">Criteria for decisions</heading><subclause affected.by.uncommenced="0" guid="_14f9f173-26ae-49af-8fdf-df9704c4a5c9" id="sec.134-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The matters that must be considered in deciding whether to grant a petroleum lease or its provisions include the development plan criteria, capability criteria and any special criteria.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_97c5d5a5-9b8d-4e02-b825-30edce065946" id="sec.134-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister may give the weight to each of the development plan, capability and special criteria that the Minister considers appropriate in the circumstances.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_bc371134-f2fc-4cfc-902c-9ac2721764e5" id="sec.135" provision.type="other" spent.amends="0"><no>135</no><heading guid="_aeb45c6d-6c96-4a2a-acb8-a66f3ac3894b" id="sec.135-he">Notice to unsuccessful tenderers</heading><subclause affected.by.uncommenced="0" guid="_dc4260cd-5e77-4589-a5da-829d36dcb33a" id="sec.135-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">After a call for tenders has been decided, each tenderer not granted the petroleum lease must be given notice of the decision.</txt><note guid="_3e0368f4-a85f-46f0-bdf6-de5efe714095" id="sec.135-ssec.1-note" type="example"><heading guid="_1aa0a40f-c7de-4b90-a86e-1a9fa0d01306" id="sec.135-ssec.1-note-he">Note—</heading><block><txt break.before="1">See also the <legref check="valid" jurisd="QLD" target.doc.id="act-1991-100" target.version.series="a8431166-6960-477c-bb90-f63ad3f3c477" type="act"><name emphasis="yes">Judicial Review Act 1991</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.32" target.doc.id="act-1991-100" target.guid="_5843facd-f562-41ab-817d-fe79e7323b25" target.version.series="a8431166-6960-477c-bb90-f63ad3f3c477" type="act">section 32</legref> (Request for statement of reasons).</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_44395d11-bff8-420d-ae86-b9b293c171c8" id="sec.135-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.131" target.guid="_8ca82c5c-e5b8-4ab5-af3e-6fd6c2ee6c22">sections 131</intref><intref check="valid" refid="sec.131-ssec.4" target.guid="_55bfaac2-ab11-4e27-8bd0-f34ae88d5b61">(4)</intref> and <intref check="valid" refid="sec.845" target.guid="_7a1a35a1-f15a-4e0d-9fda-75368645b812">845</intref><intref check="valid" refid="sec.845-ssec.5" target.guid="_13711718-4175-43b1-bc1d-c30c5b869165">(5)</intref>, the Minister must refund any tender security given by the tenderer.</txt></block></subclause></clause></subdivision></division><division affected.by.uncommenced="0" guid="_20042571-c618-44c9-9361-f8620ebcf824" id="ch.2-pt.2-div.4"><no>Division 4</no><heading guid="_cdd0ae57-f3cc-4cbb-8723-d6313387dd88" id="ch.2-pt.2-div.4-he">Development plans</heading><subdivision affected.by.uncommenced="0" guid="_e467ea0c-5fff-4b17-8428-c8f581d00b07" id="ch.2-pt.2-div.4-sdiv.1"><no>Subdivision 1</no><heading guid="_85aeee0f-3239-4e98-bca3-14b61971be53" id="ch.2-pt.2-div.4-sdiv.1-he">Function and purpose of development plan</heading><clause affected.by.uncommenced="0" guid="_59a13a64-b2d4-4be9-a12c-be5686f591f5" id="sec.136" provision.type="other" spent.amends="0"><no>136</no><heading guid="_b4944176-a113-4d77-930a-a023878175a3" id="sec.136-he">Function and purpose</heading><subclause affected.by.uncommenced="0" guid="_27dc6917-03a6-48e4-9e9f-24b2910c30cb" id="sec.136-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The development plan for a petroleum lease or proposed petroleum lease (the <defterm guid="_3104c5f6-648c-4532-a8bb-d55d63173f7e" id="sec.136-def.relevantlease" type="definition">relevant lease</defterm>) gives detailed information about the nature and extent of activities to be carried out under the relevant lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ee84377e-d9c2-4510-baef-d20e9f6dcb1d" id="sec.136-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The development plan may—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_93f888b2-e2f6-4610-a92f-a60d712b1a4e" id="sec.136-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">also relate to another petroleum lease or proposed petroleum lease if the other lease or proposed lease relates to the relevant lease; and</txt></block></li><li guid="_2527ec34-fe31-4310-9e27-e1c756c902ef" id="sec.136-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">provide that when the plan is approved it will replace any development plan for the other lease.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_bfad7f76-cbe2-4c3d-8795-73e336b431c5" id="sec.136-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The purposes of giving the information are to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a425b982-9100-44a4-9939-30f502557b96" id="sec.136-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">allow resource management decisions to be made; and</txt></block></li><li guid="_80ed432b-2222-41a7-b9ef-30c66b87cd0a" id="sec.136-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">ensure appropriate development of the lease.</txt></block></li></list></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_22107303-c65c-4332-8731-be43c5a52906" id="ch.2-pt.2-div.4-sdiv.2"><no>Subdivision 2</no><heading guid="_5804783e-0867-426e-b051-6f74ec20cf47" id="ch.2-pt.2-div.4-sdiv.2-he">Requirements for proposed initial development plans</heading><clause affected.by.uncommenced="0" guid="_01d2ad40-0ddd-419b-aae6-abfb345cc00b" id="sec.137" provision.type="other" spent.amends="0"><no>137</no><heading guid="_3bc11233-cee8-4ba0-975e-9d6fa3b958f8" id="sec.137-he">Operation of <intref check="valid" refid="ch.2-pt.2-div.4-sdiv.2" target.guid="_22107303-c65c-4332-8731-be43c5a52906">sdiv 2</intref></heading><block><txt break.before="1">This subdivision provides for requirements (the <defterm guid="_b51a7510-df33-4dc4-a654-62bf9932aaf3" id="def.initialdevelopmentplanrequirements" type="definition">initial development plan requirements</defterm>) for a proposed initial development plan for a proposed petroleum lease.</txt><note guid="_7bfb18e7-0049-48a6-9b65-2316bfba3498" id="sec.137-note" type="example"><heading guid="_613e1e45-0521-4b0c-bed3-47b357df1021" id="sec.137-note-he">Note—</heading><block><txt break.before="1">For additional requirements for development plans for coal seam gas, see <intref check="valid" refid="ch.3" target.guid="_7d989cb7-da2a-4737-842c-bd1944dbb54e">chapter 3</intref>, <intref check="valid" refid="ch.3-pt.6" target.guid="_125342c0-5c01-4b66-ba95-a4209c82febf">part 6</intref>.</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_10becc97-fe19-4bbd-9cfe-06b9477b2f73" id="sec.138" provision.type="other" spent.amends="0"><no>138</no><heading guid="_05b25d8c-ea37-4646-902d-cff8c375ed84" id="sec.138-he">General requirements</heading><subclause affected.by.uncommenced="0" guid="_0bae5e1f-e42a-4f95-aa62-fdedcae819ba" id="sec.138-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The proposed plan must provide for each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ce0ed593-6cd9-4457-92b0-72a45b37c40e" id="sec.138-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an overview of the activities proposed to be carried out under the lease or proposed lease during all of its term;</txt></block></li><li guid="_7bd8bd0a-4044-4a2f-b98a-1ef73e74c197" id="sec.138-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for each year of the plan period—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_59ed2f1a-fc42-49f2-8bac-c8e35cea3b0f" id="sec.138-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the nature and extent of activities proposed to be carried out under the lease or proposed lease during the year; and</txt></block></li><li guid="_3f5d4a24-62f0-486e-8d38-a6d888d982a5" id="sec.138-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">where the activities are proposed to be carried out; and</txt></block></li><li guid="_b8891574-3715-4e79-91ec-9de16945fb96" id="sec.138-ssec.1-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the estimated cost of the activities;</txt></block></li></list></block></li><li guid="_cb8d1210-d6f8-4a00-8d7c-d4d4a4ad7655" id="sec.138-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">for each natural underground reservoir in the area of the lease of which the applicant is aware, each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_67fbcc93-7bb2-4f86-94bd-2301511ec043" id="sec.138-ssec.1-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the location and a verifiable estimate of the amount of petroleum in the reservoir;</txt></block></li><li guid="_34b94e46-abbd-456f-a80d-1b18c47694ee" id="sec.138-ssec.1-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the standards and procedures used to make the estimate;</txt></block></li><li guid="_43148b8f-bc2f-4fe2-a7cd-2d8ae285915d" id="sec.138-ssec.1-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the rate and amount of production proposed from the reservoir;</txt></block></li><li guid="_913b8c0e-8de8-4aa9-babc-62a7ec418f82" id="sec.138-ssec.1-para1.c-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">approximately when the proposed production is to start;</txt></block></li><li guid="_92e2cb1d-7d2d-4342-8dd4-a386676b12f6" id="sec.138-ssec.1-para1.c-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">a schedule for the proposed production during the plan period;</txt></block></li></list></block></li><li guid="_4ca87227-e170-4f64-a8e6-6f42b75622a0" id="sec.138-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">maps that show the matters mentioned in <intref check="valid" refid="sec.138-ssec.1-para1.b" target.guid="_7bd8bd0a-4044-4a2f-b98a-1ef73e74c197">paragraphs (b)</intref><intref check="valid" refid="sec.138-ssec.1-para1.b-para2.i" target.guid="_59ed2f1a-fc42-49f2-8bac-c8e35cea3b0f">(i)</intref> and <intref check="valid" refid="sec.138-ssec.1-para1.b-para2.ii" target.guid="_3f5d4a24-62f0-486e-8d38-a6d888d982a5">(ii)</intref> and (c)(i);</txt></block></li><li guid="_b4b10f05-7a81-4f79-9f49-82bb43cc074f" id="sec.138-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">any other information relevant to the development plan criteria;</txt></block></li><li guid="_de929483-b027-4c7c-a2c3-0a777feb410c" id="sec.138-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">reasons why the plan is considered appropriate;</txt></block></li><li guid="_a67dab52-691e-4e8e-bf7c-0e2e7db7abb6" id="sec.138-ssec.1-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">another matter prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_919f76b2-f812-4a52-a671-ae0af5e311ca" id="sec.138-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A regulation may impose requirements about the form of the development plan.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_745fec84-5706-4ebb-af8e-d5d8471c742f" id="sec.138-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_094823f4-50ac-4159-b1af-48c1cc0d68b7" id="sec.138-ssec.3-def.year_"><txt break.before="1"><defterm guid="_66335e83-8b25-4450-9d4c-0e124971208e" id="sec.138-ssec.3-def.year" type="definition">year</defterm>, of the plan period, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f547dff8-5837-44ff-af01-0193d1077555" id="sec.138-ssec.3-def.year-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the period starting on the day the plan period starts and ending on the first anniversary of that day; and</txt></block></li><li guid="_2ba1b95c-7d9c-423f-be5d-d76868d266b7" id="sec.138-ssec.3-def.year-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">each subsequent period of 12 months or less during the plan period, starting on each anniversary of that day and ending on—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_738cf5d2-e24a-4f82-bee6-69e931391905" id="sec.138-ssec.3-def.year-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the next anniversary of that day; or</txt></block></li><li guid="_7f098185-6e31-46e8-aef3-b9eeed933673" id="sec.138-ssec.3-def.year-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the plan period ends before the next anniversary—the day the plan period ends.</txt></block></li></list></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_62411899-7888-40c2-9fb0-3afc5e7754c1" id="sec.139" provision.type="other" spent.amends="0"><no>139</no><heading guid="_203e994e-1b5d-4043-bc19-e9cf569edad7" id="sec.139-he">Plan period</heading><subclause affected.by.uncommenced="0" guid="_7153b47b-e5b2-4f32-a3e5-65c403b94d55" id="sec.139-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The proposed plan must state its period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bf95ec52-c692-420b-a290-c4b7e4342091" id="sec.139-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the proposed plan relates to a tender, the period must be the same as the required period under the relevant call for tenders.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9a8b932c-1859-462a-b0cc-823ee5eddab9" id="sec.139-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the proposed plan relates to an ATP-related application, the period must not be longer than—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a7ed0789-0b70-4681-aa74-c4046625e959" id="sec.139-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the term sought for the lease is less than 5 years from the granting of the lease—the term of the lease; or</txt></block></li><li guid="_84593c03-43c7-4b17-abfd-bcf7707f8a43" id="sec.139-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the term sought for the lease is 5 years or more from the start of the term—5 years from the start of the term.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_53f72a75-3ed2-460f-a34b-276bcba1d1d7" id="sec.140" provision.type="other" spent.amends="0"><no>140</no><heading guid="_9de4a52e-84e0-4ba1-97ec-7e81bc30a3ac" id="sec.140-he">Storage</heading><block><txt break.before="1">If natural underground reservoir storage is proposed, the proposed plan must include the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_31546c9b-fa3f-4419-ab11-2ab5289df82c" id="sec.140-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a program for evaluating, developing and using the reservoir;</txt></block></li><li guid="_63329ddd-f8d3-4b29-ad01-f4f7526cd207" id="sec.140-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a verifiable estimate of its storage capacity;</txt></block></li><li guid="_55ae305f-5ed7-4a1f-8ed7-ee336e3683ad" id="sec.140-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the standards and procedures used to make the estimate;</txt></block></li><li guid="_440fd6da-5cf9-410f-a26e-dd5cef0ba388" id="sec.140-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a schedule for the storage injection and withdrawal;</txt></block></li><li guid="_b3b9d278-4dae-447f-9525-6248c8c604b9" id="sec.140-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">another matter prescribed under a regulation.</txt></block></li></list></block></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_5c8b91f1-f2b9-420a-ab2c-36fb7ae764ea" id="ch.2-pt.2-div.4-sdiv.3"><no>Subdivision 3</no><heading guid="_632f6eee-1256-4f31-b0cd-af214837a0a3" id="ch.2-pt.2-div.4-sdiv.3-he">Criteria for deciding whether to approve proposed initial development plans</heading><note guid="_498266ed-34d1-499c-b3c5-30c837832adb" id="ch.2-pt.2-div.4-sdiv.3-note" type="example"><heading guid="_3435ad6b-86c8-4e7d-8255-f5690c92629e" id="ch.2-pt.2-div.4-sdiv.3-note-he">Note—</heading><block><txt break.before="1">For the requirement for approval of an initial development plan, see <intref check="valid" refid="sec.120" target.guid="_ca27be89-b993-4627-be10-da97814de1d8">sections 120</intref> and <intref check="valid" refid="sec.132" target.guid="_285753db-9636-4c6a-b5d2-2bed5c49c521">132</intref>.</txt></block></note><clause affected.by.uncommenced="0" guid="_822fc439-554a-4f95-85ee-d8b83b540c4d" id="sec.141" provision.type="other" spent.amends="0"><no>141</no><heading guid="_d318d8e9-3969-4771-8368-56fc73711880" id="sec.141-he">Criteria</heading><block><txt break.before="1">The matters that must be considered in deciding whether to approve a proposed development plan include each of the following (the <defterm guid="_8915463c-a509-4d67-9d38-38bf283d4110" id="def.developmentplancriteria" type="definition">development plan criteria</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b64be439-ae17-45ae-919f-102c74a0a746" id="sec.141-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the potential of the area of the proposed petroleum lease for petroleum production and related activities;</txt></block></li><li guid="_cc0c0461-2549-4d4e-b47f-7d070b276f1a" id="sec.141-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the nature and extent of the activities;</txt></block></li><li guid="_5151189d-572a-43ff-b8df-4cc378fc444a" id="sec.141-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">when and where the activities are proposed to be carried out;</txt></block></li><li guid="_14426fa9-3035-49a3-b2ff-f5cf6cac6170" id="sec.141-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">whether petroleum production sought under the lease will be optimised in the best interests of the State, having regard to the public interest.</txt></block></li></list></block></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_c554d094-afba-46a7-a75f-1c3f7e231058" id="ch.2-pt.2-div.4-sdiv.4"><no>Subdivision 4</no><heading guid="_1063045d-a45f-4a9b-b081-c11ec8ec4456" id="ch.2-pt.2-div.4-sdiv.4-he">Requirements for proposed later development plans</heading><clause affected.by.uncommenced="0" guid="_2c51dc85-dd53-468b-a675-23e09bf1ddc7" id="sec.142" provision.type="other" spent.amends="0"><no>142</no><heading guid="_58f22843-8ef7-4def-b551-c929f14c4967" id="sec.142-he">Operation of <intref check="valid" refid="ch.2-pt.2-div.4-sdiv.4" target.guid="_c554d094-afba-46a7-a75f-1c3f7e231058">sdiv 4</intref></heading><block><txt break.before="1">This subdivision provides for requirements (the <defterm guid="_72da2b5b-12be-400c-b2bc-61ba00af5c1c" id="def.laterdevelopmentplanrequirements" type="definition">later development plan requirements</defterm>) for a proposed later development plan for a petroleum lease.</txt><note guid="_1f16778f-4a75-403c-bc16-57514d79003e" id="sec.142-note" type="example"><heading guid="_6e860a5c-77db-48bf-a37a-bd6752e66386" id="sec.142-note-he">Note—</heading><block><txt break.before="1">For the requirements to lodge a proposed later development plan, see <intref check="valid" refid="sec.159" target.guid="_684a7ca4-fe5f-47c8-a929-0382f9cc1e93">sections 159</intref> (Obligation to lodge proposed later development plan), 170 (Minister may add excluded land), 372 (Requirements for making application) and 790 (Types of noncompliance action that may be taken).</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_1f6a7378-55ba-4959-ac18-e24b10a3e443" id="sec.143" provision.type="other" spent.amends="0"><no>143</no><heading guid="_63572351-c7b0-424f-9e9b-6b3049e9d102" id="sec.143-he">General requirements</heading><subclause affected.by.uncommenced="0" guid="_2709b2c2-e276-4bc9-8909-1b5c1d8a4871" id="sec.143-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The proposed plan must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ad6ea502-1f7f-40a2-b7c3-8295cfca3fc6" id="sec.143-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">comply with the initial development plan requirements, as if the reference in <intref check="valid" refid="sec.139" target.guid="_62411899-7888-40c2-9fb0-3afc5e7754c1">section 139</intref><intref check="valid" refid="sec.139-ssec.3" target.guid="_9a8b932c-1859-462a-b0cc-823ee5eddab9">(3)</intref> to the term sought for the lease were a reference to the remaining term, or the renewed term, of the lease; and</txt></block></li><li guid="_e99e03af-8031-4845-aa0c-ebbdb02dc35e" id="sec.143-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">highlight any significant changes from the current development plan for the lease; and</txt></block></li><li guid="_96267b4c-1827-4153-8f67-8f9fe4614284" id="sec.143-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the current development plan has not been complied with—state the details of, and the reasons for, each noncompliance.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b0eb14d2-d591-49f9-be89-d71d095c608c" id="sec.143-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the effect of the proposed plan is to significantly change an activity provided for under the current development plan for the lease, the proposed plan must also state reasons for the change.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8b14aaa6-8886-4825-a495-d6c1ab5e669a" id="sec.143-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, for a significant change that is a cessation or reduction of petroleum production, the proposed plan must include an evaluation of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_80472524-9f41-4c07-89ac-0dc33a68d733" id="sec.143-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">petroleum production potential in the area of the lease; and</txt></block></li><li guid="_0900c053-ea8f-4f27-bfe7-10349fbfffaf" id="sec.143-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">market opportunities for petroleum production in the area of the lease.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c9853219-842f-468b-a0dc-7052988ee370" id="sec.144" provision.type="other" spent.amends="0"><no>144</no><heading guid="_dc77852a-1ca1-40c9-b480-62411f1340a9" id="sec.144-he">Later development plans for proposed new leases</heading><block><txt break.before="1">Proposed later development plans for an application under <intref check="valid" refid="ch.2-pt.2-div.7" target.guid="_2bb22cfe-e8d5-4c9d-9726-0c2f089841e4">division 7</intref>, <intref check="valid" refid="ch.2-pt.2-div.7-sdiv.2" target.guid="_f21b2cea-3c44-4eb9-9d6e-44d180eaa233">subdivision 2</intref>, to divide a petroleum lease must have a combined effect that is at least the effect of the development plan for the original lease.</txt></block></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_5a644447-4370-4388-91c0-338340532823" id="ch.2-pt.2-div.4-sdiv.5"><no>Subdivision 5</no><heading guid="_ca882046-896c-4628-88c5-08693bc14eb2" id="ch.2-pt.2-div.4-sdiv.5-he">Approval of proposed later development plans</heading><clause affected.by.uncommenced="0" guid="_dc7d9606-29b5-40cd-afed-285e1c014e2d" id="sec.145" provision.type="other" spent.amends="0"><no>145</no><heading guid="_1e15245a-4890-493f-aac9-c6b066d2f6fc" id="sec.145-he">Application of <intref check="valid" refid="ch.2-pt.2-div.4-sdiv.5" target.guid="_5a644447-4370-4388-91c0-338340532823">sdiv 5</intref></heading><block><txt break.before="1">This subdivision applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6a01df3d-54f8-4b3a-8182-1dce97f6d4b2" id="sec.145-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">under this Act, a proposed later development plan is lodged for approval; or</txt><note guid="_8026a64c-55fc-416d-9cb2-fc2d2c724d62" id="sec.145-para1.a-note" type="example"><heading guid="_28356a30-aa51-4567-b72e-7d767ea6cfdc" id="sec.145-para1.a-note-he">Note—</heading><block><txt break.before="1">For requirements to lodge a proposed later development plan, see <intref check="valid" refid="sec.100" target.guid="_5aa886d4-cfc8-4f39-96cd-b320c5c6ffce">sections 100</intref>, <intref check="valid" refid="sec.159" target.guid="_684a7ca4-fe5f-47c8-a929-0382f9cc1e93">159</intref>, <intref check="valid" refid="sec.170" target.guid="_d85a781b-a875-4e0f-8df9-beea519b6a1b">170</intref>, <intref check="valid" refid="sec.372" target.guid="_ca69f628-3c9d-4326-827f-8e1640ad6c55">372</intref> and <intref check="valid" refid="sec.790" target.guid="_0ae40873-0f6d-4440-a74c-a02fa5649d4f">790</intref>, <intref check="valid" refid="ch.2-pt.2-div.6" target.guid="_d22f629a-3d37-46e1-8859-aa3126540bf2">division 6</intref> and <intref check="valid" refid="ch.2-pt.2-div.7" target.guid="_2bb22cfe-e8d5-4c9d-9726-0c2f089841e4">division 7</intref>, <intref check="valid" refid="ch.2-pt.2-div.7-sdiv.2" target.guid="_f21b2cea-3c44-4eb9-9d6e-44d180eaa233">subdivision 2</intref>.</txt></block></note></block></li><li guid="_e7026d6c-63a6-460f-9e65-3e58c403acb3" id="sec.145-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Minister is considering an application under <intref check="valid" refid="sec.235" target.guid="_931761e8-f737-4c43-9b1e-d7743343db18">section 235</intref> for approval of a proposed coordination arrangement.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_f51ae72a-ad75-4ca2-ad7b-9294ba889705" id="sec.145A" provision.type="other" spent.amends="0"><no>145A</no><heading guid="_103c7bac-ce68-4876-8604-d8d0486baabd" id="sec.145A-he">Modified application of <intref check="valid" refid="ch.14" target.guid="_7ee6daab-b446-4e66-bc06-a512720a57d9">ch 14</intref>, <intref check="valid" refid="ch.14-pt.1" target.guid="_108499d8-4a72-4118-bb31-a62f01acaa46">pt 1</intref></heading><block><txt break.before="1"><intref check="valid" refid="ch.14" target.guid="_7ee6daab-b446-4e66-bc06-a512720a57d9">Chapter 14</intref>, <intref check="valid" refid="ch.14-pt.1" target.guid="_108499d8-4a72-4118-bb31-a62f01acaa46">part 1</intref> applies in relation to the lodgement by a petroleum lease holder of a proposed later development plan as if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_646a71d5-9973-4e0c-a325-8c3405d191d0" id="sec.145A-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the lodgement of the proposed plan were the making of an application by the holder; and</txt></block></li><li guid="_ff9237da-88c6-445f-b4ed-55258ea2b7b7" id="sec.145A-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the later development plan requirements for the proposed plan were the requirements under <intref check="valid" refid="ch.14" target.guid="_7ee6daab-b446-4e66-bc06-a512720a57d9">chapter 14</intref>, <intref check="valid" refid="ch.14-pt.1" target.guid="_108499d8-4a72-4118-bb31-a62f01acaa46">part 1</intref> for making the application.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_420b6b80-12e8-4a44-9630-2138f0a753f4" id="sec.146" provision.type="other" spent.amends="0"><no>146</no><heading guid="_fff131ee-d287-4798-8692-89ee633ff385" id="sec.146-he">Petroleum lease taken to have development plan until decision on whether to approve proposed development plan</heading><subclause affected.by.uncommenced="0" guid="_ee9e5a16-e87e-4c94-845e-a5f4e3323d8a" id="sec.146-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies until—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9a90f49d-55d7-45c1-a1df-980482d13965" id="sec.146-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the proposed plan is approved—the holder is given notice of the approval; or</txt></block></li><li guid="_83596fea-a934-4010-be0b-9fba50998c63" id="sec.146-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if approval of the proposed plan is refused—when the refusal takes effect.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_cee3e0a0-02d2-449e-b979-6e3ee029bd53" id="sec.146-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite the ending of the plan period for the current development plan for the petroleum lease—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_687a54d8-7909-4c4e-89f1-ec3d755be8f3" id="sec.146-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the lease is taken to have a development plan; and</txt></block></li><li guid="_33d82965-e8f0-4703-9dc4-82babc810ab2" id="sec.146-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder may carry out any authorised activity for the lease.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_9893cbfd-0dee-451b-add3-1032f946c4bd" id="sec.147" provision.type="other" spent.amends="0"><no>147</no><heading guid="_830277d5-f6c8-4aa9-bb91-4b0ff2c57c70" id="sec.147-he">Deciding whether to approve proposed plan</heading><subclause affected.by.uncommenced="0" guid="_5617251c-106e-4443-ab4a-540f1ea40d74" id="sec.147-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may approve or refuse to approve the proposed plan.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3fb89ae9-f408-4fb3-86e4-d6591e8dae17" id="sec.147-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The matters that must be considered in deciding whether to approve the proposed plan include each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c566b872-1989-47c9-a9f8-5d3e6df7d709" id="sec.147-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the development plan criteria;</txt></block></li><li guid="_a4530ed5-d381-4a0f-b347-57c84935af88" id="sec.147-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the extent to which the current development plan for the lease has been complied with;</txt></block></li><li guid="_b08d3e2e-7509-4caa-954a-fbde6bc3eace" id="sec.147-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the proposed plan provides for a significant change that is a cessation or reduction of petroleum production—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8952502b-5aad-464c-b9ed-97cf1d785783" id="sec.147-ssec.2-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">whether the cessation or reduction is reasonable; and</txt></block></li><li guid="_0416692b-903b-4863-9a91-5fac951d1222" id="sec.147-ssec.2-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">whether the petroleum lease holder has taken all reasonable steps to prevent the cessation or reduction.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5f43b058-6908-4339-9979-acd8d6537807" id="sec.147-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, if the lease was granted in response to a tender, any other development plan proposed by other tenderers for the lease must be taken into account.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8102fcab-88a4-4570-a771-28dcf42a2d54" id="sec.147-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.147-ssec.3" target.guid="_5f43b058-6908-4339-9979-acd8d6537807">subsection (3)</intref> applies only to the extent the other plan includes the period of the proposed plan.</txt></block></subclause><subclause affected.by.uncommenced="0" change="ins" guid="_9ccf81a3-a628-45f6-9a46-0792fefef9d7" id="sec.147-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The Minister may give the holder of the petroleum lease a notice requiring the holder to give the Minister, within the reasonable period stated in the notice, information the Minister reasonably requires to decide whether to approve the proposed plan.</txt></block></subclause><subclause affected.by.uncommenced="0" change="ins" guid="_bfb216eb-9419-4494-837c-87e3f5744153" id="sec.147-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">If the holder does not comply with the requirement, the Minister may refuse to approve the proposed plan.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_115b1a82-d8d2-4486-afff-5e835526ac37" id="sec.148" provision.type="other" spent.amends="0"><no>148</no><heading guid="_4a862fbe-beeb-493c-8f68-e8e98856f9e9" id="sec.148-he">Power to require relinquishment</heading><subclause affected.by.uncommenced="0" guid="_ec76fb26-59a9-4ef9-bc09-02003fd1c3fe" id="sec.148-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the proposed plan provides for a significant change that is a cessation or reduction of petroleum production.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b3d7755c-135e-4dff-84c4-002c3b1c7bee" id="sec.148-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister may approve the proposed plan, but—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5c15989b-502b-4502-be01-03dbb638137b" id="sec.148-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">decide (a <defterm guid="_deca9c25-906a-4099-82de-7d78a87db385" id="sec.148-ssec.2-def.deferraldecision" type="definition">deferral decision</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_29037571-5ea1-4bbb-a1cc-4c84e0d7a8f7" id="sec.148-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">to defer the taking of effect of the approval until the petroleum lease holder relinquishes, by a lodged notice, a stated part or percentage of the area of the lease on or before a stated day; and</txt></block></li><li guid="_7095cf49-bf7e-4b4c-a836-54d395ce08b6" id="sec.148-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">that the decision to approve the proposed plan is replaced by a decision not to approve it if the notice is not lodged on or before the stated day; or</txt></block></li></list></block></li><li guid="_91a72625-508a-436b-819e-caf59033bc51" id="sec.148-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">impose a condition on the lease requiring its holder to relinquish, by a lodged notice, a stated part or percentage of the area of the lease at stated times or intervals.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b20ae034-63d6-4187-b612-656dabaa0915" id="sec.148-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The public interest must be considered before making a deferral decision or imposing the condition.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1005126f-a870-43da-a57c-a610da33eee0" id="sec.148-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A relinquishment under <intref check="valid" refid="sec.148-ssec.2" target.guid="_b3d7755c-135e-4dff-84c4-002c3b1c7bee">subsection (2)</intref><intref check="valid" refid="sec.148-ssec.2-para1.a" target.guid="_5c15989b-502b-4502-be01-03dbb638137b">(a)</intref><intref check="valid" refid="sec.148-ssec.2-para1.a-para2.i" target.guid="_29037571-5ea1-4bbb-a1cc-4c84e0d7a8f7">(i)</intref> takes effect on the day after the notice is lodged.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_acf8c68b-60e8-4496-93e6-f0a7bc5e05ac" id="sec.149" provision.type="other" spent.amends="0"><no>149</no><heading guid="_cade60d8-216a-47a6-894f-bec1ee3a04f1" id="sec.149-he">Steps after, and taking effect of, decision</heading><subclause affected.by.uncommenced="0" guid="_c68f92d1-43a7-46d2-b666-1a532b6e6e5e" id="sec.149-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">On approval of the proposed later development plan, the holder must be given notice of the approval.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9225d74b-c140-4907-b8c1-6d476be4f88c" id="sec.149-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The approval takes effect when the holder is given the notice or, if the notice states a later day of effect, on that later day.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_16bb0c46-492e-4882-8a6d-f2f476e85000" id="sec.149-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The holder must be given an information notice about—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dce810c9-9e86-4d81-aaad-181610fd1eac" id="sec.149-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a decision to refuse to approve the proposed plan; or</txt></block></li><li guid="_62b3e093-fe55-48ac-adb0-d4203b4aa299" id="sec.149-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a decision, under <intref check="valid" refid="sec.148" target.guid="_115b1a82-d8d2-4486-afff-5e835526ac37">section 148</intref>, to make a deferral decision or impose a condition.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a4c1a6cb-0cee-4a82-b16a-a786d79d461b" id="sec.149-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A refusal does not takes effect until the end the appeal period for the decision to refuse.</txt></block></subclause></clause></subdivision></division><division affected.by.uncommenced="0" guid="_659d1ea0-0fed-489d-90b6-75ae32c26ef7" id="ch.2-pt.2-div.5"><no>Division 5</no><heading guid="_23aa833c-e7bb-45d7-935d-6e681de23601" id="ch.2-pt.2-div.5-he">Key mandatory conditions for petroleum leases</heading><subdivision affected.by.uncommenced="0" guid="_f5dba3cd-addf-4b4c-a63f-f7ae252a497b" id="ch.2-pt.2-div.5-sdiv.1" numbering.style="manual"><no>Subdivision 1</no><heading guid="_2c36de2e-cf8b-4f93-8385-24f29d5200b5" id="ch.2-pt.2-div.5-sdiv.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_69e8dbf0-28ce-4e18-961d-185e240c53f9" id="sec.150" provision.type="other" spent.amends="0"><no>150</no><heading guid="_78c770d2-1486-4b43-8618-da61d1084ebe" id="sec.150-he">Operation of <intref check="valid" refid="ch.2-pt.2-div.5" target.guid="_659d1ea0-0fed-489d-90b6-75ae32c26ef7">div 5</intref></heading><block><txt break.before="1">This division provides for particular mandatory conditions for petroleum leases.</txt><note guid="_635bb340-8d8d-4cca-ad20-6b6d293a71cd" id="sec.150-note" type="example"><heading guid="_c937183b-f6eb-44e4-a1f7-83106b908ba4" id="sec.150-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_53eab7e8-9dc2-4841-a894-9480f2d1d5fb" id="sec.150-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">The following provisions also impose mandatory conditions on petroleum leases—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_77c4cbe1-03a8-490e-a6fe-252cf0a06abe" id="sec.150-note-para1.1-para2" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="ch.2-pt.2-div.1" target.guid="_526a1e56-68ca-4b89-b8fb-4be7083ed4eb">division 1</intref></txt></block></li><li guid="_8b99f068-3888-45ae-bd8a-c2bb1fae9f6d" id="sec.150-note-para1.1-para2-oc.2" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="ch.2-pt.4" target.guid="_b576db0f-1676-41bb-9d2a-0c120f59c456">parts 4</intref> and <intref check="valid" refid="ch.2-pt.10" target.guid="_6f7f9284-5836-4486-b63b-35e219633886">10</intref></txt></block></li><li guid="_93ebe54e-a42c-4e72-8f8b-e3fce97c9b61" id="sec.150-note-para1.1-para2-oc.3" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="sec.181" target.guid="_a675db94-8efd-49c4-a0a5-c63c54c8b14b">sections 181</intref> and <intref check="valid" refid="sec.202" target.guid="_30750e13-e21b-469c-b848-00dc23ab09f3">202</intref></txt></block></li><li guid="_4b0be115-aff9-4375-9ae1-9b8385d00aa3" id="sec.150-note-para1.1-para2-oc.4" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="ch.2-pt.6" target.guid="_55412cd7-ecff-4e2b-99fa-1c2290aac632">part 6</intref>, <intref check="valid" refid="ch.2-pt.6-div.2" target.guid="_930ebeab-76f6-4c52-9de1-894f8b7905db">division 2</intref>, <intref check="valid" refid="ch.2-pt.6-div.2-sdiv.2" target.guid="_bddbb8f4-5759-4a05-960e-4e0a0cd23730">subdivision 2</intref></txt></block></li><li guid="_32e2f0f9-bc2d-4252-8c59-9886892dec49" id="sec.150-note-para1.1-para2-oc.5" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="ch.3" target.guid="_7d989cb7-da2a-4737-842c-bd1944dbb54e">chapter 3</intref>, <intref check="valid" refid="ch.3-pt.5" target.guid="_59822ecb-942d-4546-ac03-3b1428443975">part 5</intref>, <intref check="valid" refid="ch.3-pt.5-div.2" target.guid="_9640ec4b-a424-4eb6-bdfe-0d500cdde4f4">division 2</intref></txt></block></li><li guid="_ca730138-fe9c-4a2c-befd-eb6197b113ea" id="sec.150-note-para1.1-para2-oc.6" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="ch.3A" target.guid="_4864cab3-5ae5-49c9-aeb6-cdfaa85590af">chapter 3A</intref>, <intref check="valid" refid="ch.3A-pt.5" target.guid="_fa8a3d9c-8f2e-42e4-9995-76304c3d08e0">part 5</intref></txt></block></li><li guid="_03fc52da-ed62-4e04-bc68-dd36783cd112" id="sec.150-note-para1.1-para2-oc.7" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref>.</txt></block></li></list></block></li><li guid="_e7c0cde1-ff27-4ed9-a491-75e6295f0aab" id="sec.150-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">For what is a mandatory condition, see <intref check="valid" refid="sec.20" target.guid="_746e989f-44f2-4d9b-9550-13495b74b131">section 20</intref><intref check="valid" refid="sec.20-ssec.2" target.guid="_6716699a-7cd3-4f35-945e-49a35a3ccdd3">(2)</intref>.</txt></block></li></list></block></note></block></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_55fa8061-6d00-49ff-9ef4-92fbf476a475" id="ch.2-pt.2-div.5-sdiv.2" numbering.style="manual"><no>Subdivision 2</no><heading guid="_b57bc333-04be-4167-91f3-c1e1fd3308aa" id="ch.2-pt.2-div.5-sdiv.2-he">Key mandatory conditions for particular types of testing</heading><clause affected.by.uncommenced="0" guid="_28d5e4f1-45d3-4468-a0c8-c40686dec0cf" id="sec.150A" provision.type="other" spent.amends="0"><no>150A </no><heading guid="_f344bbc0-3227-4967-8b73-6e2d7099a8eb" id="sec.150A-he">PL production testing</heading><subclause affected.by.uncommenced="0" guid="_7a693512-7345-4f9e-ac80-1584a769390b" id="sec.150A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.151" target.guid="_ab097f72-fe3f-4aac-a915-9f1f53b6562c">section 151</intref>, a petroleum lease holder may carry out testing for petroleum production for a petroleum well (<defterm guid="_bd48f0c6-1f09-4f70-a180-3fc6acda548a" id="sec.150A-def.PLproductiontesting" type="definition">PL production testing</defterm>) within the area of the lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_aa4a9a83-8730-4dd1-ae73-6070c2f2aa7e" id="sec.150A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, it is a condition of the petroleum lease that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9a4cb606-4bd8-4c47-90bf-0780eeca3035" id="sec.150A-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the holder gives the chief executive a notice, containing the information prescribed by regulation, in relation to the PL production testing within 20 business days after the testing starts; and</txt></block></li><li guid="_e8c5447d-4b80-418a-9980-56c02831f9ec" id="sec.150A-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the testing is carried out after the end date for the testing only with the Minister’s approval.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e8227f2c-a99f-4951-b393-1d97f6c28ee1" id="sec.150A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister may, at any time, approve the carrying out after the end date for PL production testing (the <defterm guid="_29b181d4-2805-4746-82f5-8b34538367e0" id="sec.150A-def.originalPLproductiontesting" type="definition">original PL production testing</defterm>) of further PL production testing and the approval is subject to the conditions the Minister considers appropriate.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_26b67d7d-5ffc-4387-89d8-31ec50461bc3" id="sec.150A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the Minister decides not to approve the carrying out of further PL production testing, the Minister must give the petroleum lease holder an information notice about the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_230cd6e5-1d6c-42fc-adf2-c7a5158bdb36" id="sec.150B" provision.type="other" spent.amends="0"><no>150B </no><heading guid="_5884942c-81b2-4ae6-9827-6ea1b8b8cc48" id="sec.150B-he">Approval of particular ATP production testing taken to be approval for PL production testing</heading><subclause affected.by.uncommenced="0" guid="_31ae759a-702a-4dde-b40d-7caa478b84ed" id="sec.150B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e25ea790-bc3e-4694-b399-2a555f0716b6" id="sec.150B-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">under <intref check="valid" refid="sec.71A" target.guid="_4d4a223e-4703-4e99-a040-ab3ece73040e">section 71A</intref><intref check="valid" refid="sec.71A-ssec.3" target.guid="_96f94324-02af-45cc-8c43-042bad2c03d5">(3)</intref>, the Minister has approved the carrying out of further ATP production testing by an authority to prospect holder for a petroleum well within an area (the <defterm guid="_fb580c43-7010-49cb-bcc1-4638a6dbf8b5" id="sec.150B-ssec.1-def.originalapproval" type="definition">original approval</defterm>); and</txt></block></li><li guid="_d7e591de-bd83-4bed-9561-084ac4d46d99" id="sec.150B-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Minister grants the holder a petroleum lease under <intref check="valid" refid="sec.120" target.guid="_ca27be89-b993-4627-be10-da97814de1d8">section 120</intref> or <intref check="valid" refid="sec.340" target.guid="_9b3d744f-90d5-4e0b-8afe-68123f993116">340</intref> for the area, or a part of the area containing the petroleum well.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c4dca4a8-2bae-4478-aa57-61f13cd9238c" id="sec.150B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The original approval continues in existence for the further ATP production testing, and is taken to be an approval by the Minister, under <intref check="valid" refid="sec.150A" target.guid="_28d5e4f1-45d3-4468-a0c8-c40686dec0cf">section 150A</intref><intref check="valid" refid="sec.150A-ssec.3" target.guid="_e8227f2c-a99f-4951-b393-1d97f6c28ee1">(3)</intref> (the <defterm guid="_9e74afc0-5132-406c-bd0d-7d793adace63" id="sec.150B-def.transitionalapproval" type="definition">transitional approval</defterm>), of further PL production testing for the petroleum well.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0c0b3211-1792-44bd-8729-446ff9639597" id="sec.150B-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The transitional approval is subject to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2bc1dc82-8501-45d8-8bb7-2f9bb3236866" id="sec.150B-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the conditions to which the original approval is subject under <intref check="valid" refid="sec.71A" target.guid="_4d4a223e-4703-4e99-a040-ab3ece73040e">section 71A</intref><intref check="valid" refid="sec.71A-ssec.3" target.guid="_96f94324-02af-45cc-8c43-042bad2c03d5">(3)</intref>; and</txt></block></li><li guid="_d189bd38-5760-4d2f-ad58-895674c3040b" id="sec.150B-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any new conditions the Minister considers appropriate.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c8284da4-5701-4f54-ade5-52a0612f7e9d" id="sec.150C" provision.type="other" spent.amends="0"><no>150C </no><heading guid="_30a154a6-9423-4f8d-ab95-9fedce2709e2" id="sec.150C-he">PL storage testing</heading><subclause affected.by.uncommenced="0" guid="_0e19e5ef-f14f-4c97-b6ce-066dc1b7c325" id="sec.150C-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.151" target.guid="_ab097f72-fe3f-4aac-a915-9f1f53b6562c">section 151</intref>, a petroleum lease holder may carry out testing for the storage of petroleum or a prescribed storage gas in a natural underground reservoir (<defterm guid="_a42daca1-c209-4faa-88a8-f6350c37e7bd" id="sec.150C-def.PLstoragetesting" type="definition">PL storage testing</defterm>) within the area of the lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_cf5c16be-d10a-4bfd-8921-3727a055c31e" id="sec.150C-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, it is a condition of the petroleum lease that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_98980b72-1789-49b8-873f-f22cc30c5863" id="sec.150C-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the holder gives the chief executive a notice, containing the information prescribed by regulation, in relation to the PL storage testing within 20 business days after the testing starts; and</txt></block></li><li guid="_3cafe67d-d06e-40b7-96ac-19fc9fc43a96" id="sec.150C-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the testing is carried out after the end date for the testing only with the Minister’s approval.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6dc9de12-b5c1-4f38-83be-ea4943229682" id="sec.150C-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.150C-ssec.4" target.guid="_39b2ed44-11f0-4b10-8018-186ba9cccdf7">subsection (4)</intref>, the Minister may, at any time, approve the carrying out after the end date for PL storage testing (the <defterm guid="_686592b1-6557-4914-af62-ae71aba8b199" id="sec.150C-def.originalPLstoragetesting" type="definition">original PL storage testing</defterm>) of further PL storage testing and the approval is subject to the conditions the Minister considers appropriate.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_39b2ed44-11f0-4b10-8018-186ba9cccdf7" id="sec.150C-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">An approval may not be given under <intref check="valid" refid="sec.150C-ssec.3" target.guid="_6dc9de12-b5c1-4f38-83be-ea4943229682">subsection (3)</intref> more than 1 day before the end date for the original PL storage testing.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_09c9d355-6487-49f7-bdbd-e1486ec00df5" id="sec.150C-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the Minister decides not to approve the carrying out of further PL storage testing, the Minister must give the petroleum lease holder an information notice about the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_07e2100f-8742-42ec-8b02-2293857088b5" id="sec.150C-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">Despite <intref check="valid" refid="sec.150C-ssec.1" target.guid="_0e19e5ef-f14f-4c97-b6ce-066dc1b7c325">subsections (1)</intref> to <intref check="valid" refid="sec.150C-ssec.3" target.guid="_6dc9de12-b5c1-4f38-83be-ea4943229682">(3)</intref>, a petroleum lease holder can not carry out GHG stream storage.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d27a466c-6250-43d2-8832-981de24b8184" id="sec.150D" provision.type="other" spent.amends="0"><no>150D </no><heading guid="_3e65cebd-45a6-4fe3-a385-5eaa5b159dfd" id="sec.150D-he">Approval of particular ATP storage testing taken to be approval for PL storage testing</heading><subclause affected.by.uncommenced="0" guid="_341c1eda-fd92-4c20-8b44-971091bc147c" id="sec.150D-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bb447bf9-6c93-4ff9-befa-2ec561dd1780" id="sec.150D-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">under <intref check="valid" refid="sec.71B" target.guid="_01de1f46-50df-428a-a2ea-6a79bb7e8c08">section 71B</intref><intref check="valid" refid="sec.71B-ssec.3" target.guid="_1fa7ffda-f75a-451a-a89d-4535dafe0bc6">(3)</intref>, the Minister has approved the carrying out of further ATP storage testing by an authority to prospect holder for a natural underground reservoir within an area (the <defterm guid="_1a9e9d59-dbe1-492c-b81a-8b8137b97645" id="sec.150D-ssec.1-def.originalapproval" type="definition">original approval</defterm>); and</txt></block></li><li guid="_1cabc62c-75ee-457b-8608-cb4e9997e8e4" id="sec.150D-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Minister grants the holder a petroleum lease under <intref check="valid" refid="sec.120" target.guid="_ca27be89-b993-4627-be10-da97814de1d8">section 120</intref> for the area, or a part of the area containing the natural underground reservoir.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5f30c969-9b7d-444d-9beb-61f3849c49fe" id="sec.150D-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The original approval continues in existence for the further ATP storage testing, and is taken to be an approval by the Minister, under <intref check="valid" refid="sec.150C" target.guid="_c8284da4-5701-4f54-ade5-52a0612f7e9d">section 150C</intref><intref check="valid" refid="sec.150C-ssec.3" target.guid="_6dc9de12-b5c1-4f38-83be-ea4943229682">(3)</intref> (the <defterm guid="_196f1885-cdcb-4143-9aa1-e9147edd8870" id="sec.150D-def.transitionalapproval" type="definition">transitional approval</defterm>), of further PL storage testing for the reservoir within the area of the petroleum lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9d2f9083-30b7-40c6-8e2d-54684234d6d3" id="sec.150D-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The transitional approval is subject to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_384957ce-f964-448d-9742-8660b4351306" id="sec.150D-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the conditions to which the original approval is subject under <intref check="valid" refid="sec.71B" target.guid="_01de1f46-50df-428a-a2ea-6a79bb7e8c08">section 71B</intref><intref check="valid" refid="sec.71B-ssec.3" target.guid="_1fa7ffda-f75a-451a-a89d-4535dafe0bc6">(3)</intref>; and</txt></block></li><li guid="_eca4f41b-622f-4f4b-b49a-351f9a54e936" id="sec.150D-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any new conditions the Minister considers appropriate.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_fcdec4ce-efc8-4a3c-b761-efd5d6ec3557" id="sec.150E" provision.type="other" spent.amends="0"><no>150E </no><heading guid="_2747aed5-fc6a-4fc6-9634-d9bfef432965" id="sec.150E-he">Petroleum lease holder must notify chief executive if testing stops</heading><block><txt break.before="1">If a petroleum lease holder stops carrying out any PL production testing or PL storage testing within the area of the lease for a continuous period of 14 days or more, the holder must give the chief executive a notice, containing the information prescribed by regulation, in relation to the testing within 20 business days after the testing stops.</txt></block></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_1975c37a-55f3-433f-9ee0-b2d9c8e9b0e8" id="ch.2-pt.2-div.5-sdiv.3" numbering.style="manual"><no>Subdivision 3</no><heading guid="_9c4805a7-8968-4952-9e53-267641e8fbf4" id="ch.2-pt.2-div.5-sdiv.3-he">Other key mandatory conditions</heading><clause affected.by.uncommenced="0" guid="_ab097f72-fe3f-4aac-a915-9f1f53b6562c" id="sec.151" provision.type="other" spent.amends="0"><no>151</no><heading guid="_c5e43477-d0a1-4148-b269-3b660cdffaee" id="sec.151-he">Restriction on flaring or venting</heading><subclause affected.by.uncommenced="0" guid="_ceec1d65-7185-489b-9e25-7d61531580d0" id="sec.151-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A petroleum lease holder must not flare or vent petroleum in a gaseous state produced under the lease unless the flaring or venting is authorised under this section.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e4c7d59f-c195-477f-b922-e5d466b09888" id="sec.151-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Flaring the gas is authorised if it is not commercially or technically feasible to use it—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_38a41f16-4682-489a-92b4-a60cd767c33a" id="sec.151-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">commercially under the lease; or</txt></block></li><li guid="_aa4e1e7f-32c3-4e10-bd28-601d80e47cc3" id="sec.151-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for an authorised activity for the lease.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_fcdfc5d2-0500-41ec-bb7d-a6480cc5f6b2" id="sec.151-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Venting the gas is authorised if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_19929998-9b10-4d9f-b96f-f28d80e0913d" id="sec.151-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">it is not safe to use the gas for a purpose mentioned in <intref check="valid" refid="sec.151-ssec.2" target.guid="_e4c7d59f-c195-477f-b922-e5d466b09888">subsection (2)</intref><intref check="valid" refid="sec.151-ssec.2-para1.a" target.guid="_38a41f16-4682-489a-92b4-a60cd767c33a">(a)</intref> or <intref check="valid" refid="sec.151-ssec.2-para1.b" target.guid="_aa4e1e7f-32c3-4e10-bd28-601d80e47cc3">(b)</intref> or to flare it; or</txt></block></li><li guid="_73ef6c27-7954-4a23-abe6-7c3072f84c13" id="sec.151-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">flaring it is not technically practicable.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a6bfd00e-b71f-4392-8bd2-54b402af4c30" id="sec.151-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Venting the gas is also authorised if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_551c0e05-727a-4cc4-9f20-4f2e0c7581be" id="sec.151-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">it is being used, or is proposed to be used, under a greenhouse abatement scheme; and</txt></block></li><li guid="_4ee0c7bd-bfce-47c9-9e40-96dd1b4a8a53" id="sec.151-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if <intref check="valid" refid="sec.151-ssec.1" target.guid="_ceec1d65-7185-489b-9e25-7d61531580d0">subsection (1)</intref> were to apply, the direct or indirect benefit the lease holder would otherwise obtain because of the use of the gas under the scheme would be reduced.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_68ae1ff0-1b2d-4a69-a1d0-334b0a05a184" id="sec.151-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_8e69607f-bfbb-4dd8-b2cf-a51bd7f109a7" id="sec.151-ssec.5-def.greenhouseabatementscheme_"><txt break.before="1"><defterm guid="_72d82687-7d11-4bf3-b924-ffdcbb251f01" id="sec.151-ssec.5-def.greenhouseabatementscheme" type="definition">greenhouse abatement scheme</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a1bbe024-f59a-488c-89eb-fae8d65b2038" id="sec.151-ssec.5-def.greenhouseabatementscheme-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the <legref check="invalid" jurisd="NSW" type="act"><name emphasis="yes">Electricity Supply Act 1995</name> (NSW)</legref>, <legref check="invalid" jurisd="QLD" refid="pt.8A" type="act">part 8A</legref>; or</txt><note guid="_1522db63-22c2-4a10-bf26-d939e5dfe789" id="sec.151-ssec.5-def.greenhouseabatementscheme-para1.a-note" type="example"><heading guid="_329104b2-5c44-49ae-a6a4-680ab0cffa54" id="sec.151-ssec.5-def.greenhouseabatementscheme-para1.a-note-he">Note—</heading><block><txt break.before="1">See, in particular, the <legref check="invalid" jurisd="NSW" type="act"><name emphasis="yes">Greenhouse Gas Benchmark Rule (Generation) No. 2 of 2003</name></legref>, paragraph 10.1 (Total greenhouse gas emissions), made under the <legref check="invalid" jurisd="NSW" type="act"><name emphasis="yes">Electricity Supply Act 1995</name> (NSW)</legref>, <legref check="invalid" jurisd="QLD" refid="pt.8A" type="act">part 8A</legref>, <legref check="invalid" jurisd="QLD" refid="sec.97K" type="act">section 97K</legref>.</txt></block></note></block></li><li guid="_5bd10917-47e5-42a9-8529-11d2cc44d09b" id="sec.151-ssec.5-def.greenhouseabatementscheme-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Commonwealth’s Greenhouse Gas Abatement Program; or</txt></block></li><li guid="_d385e434-733c-43a2-875b-d70e984fd870" id="sec.151-ssec.5-def.greenhouseabatementscheme-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">another scheme about the abatement of greenhouse gases prescribed under a regulation.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_480bb62b-8b18-47ac-9d79-897b1c68b4b0" id="sec.154" provision.type="other" spent.amends="0"><no>154</no><heading guid="_75f9eac2-7363-4d27-950d-4368b11616fb" id="sec.154-he">Obligation to commence production</heading><subclause affected.by.uncommenced="0" guid="_7cd03659-77bc-4301-9f03-3a9113ecabfa" id="sec.154-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A petroleum lease holder must start petroleum production under the lease on or before the later of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_640560ff-8c23-4e7c-b5fb-a1a2664905bf" id="sec.154-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the end of 2 years after the lease takes effect;</txt></block></li><li guid="_055ff90c-93a5-4911-b154-1ecb6fe671ce" id="sec.154-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any production commencement day for the lease.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_fb2d1272-a805-4d77-9809-4c114cd1b136" id="sec.154-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.154-ssec.1" target.guid="_7cd03659-77bc-4301-9f03-3a9113ecabfa">subsection (1)</intref> does not apply if the development plan for the lease only provides for natural underground reservoir storage.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1d474d73-40e7-41ac-90d2-5f23e74c581d" id="sec.155" provision.type="other" spent.amends="0"><no>155</no><heading guid="_8135425f-c27a-41cb-9ecc-a959d305304f" id="sec.155-he">Petroleum royalty and annual rent</heading><subclause affected.by.uncommenced="0" guid="_9a93ef5d-3348-4b33-a6da-fbb2a3459433" id="sec.155-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A petroleum lease holder must pay the State—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_13daa42c-a525-4fce-b5a3-3ba662f5d66d" id="sec.155-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">petroleum royalty as required under <intref check="valid" refid="ch.6" target.guid="_1179c65a-355e-4281-a616-c3e83927d1e4">chapter 6</intref>; and</txt></block></li><li guid="_16d8a53a-cdcb-4737-a831-930a96e7e358" id="sec.155-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the annual rent, as prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_fe57141a-e9b3-4235-a036-d76ba02f3204" id="sec.155-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The annual rent must be paid in the way, and on or before the day, prescribed under a regulation.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_303a3992-6f4c-4625-83aa-a9c8be8a6db2" id="sec.156" provision.type="other" spent.amends="0"><no>156</no><heading guid="_3751ec3a-6237-4695-b888-31b9e8f14a30" id="sec.156-he">Civil penalty for nonpayment of annual rent</heading><subclause affected.by.uncommenced="0" guid="_76c30648-4b21-429d-8018-218ab3abbe85" id="sec.156-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a petroleum lease holder does not pay the annual rent as required under <intref check="valid" refid="sec.155" target.guid="_1d474d73-40e7-41ac-90d2-5f23e74c581d">section 155</intref>, the holder must also pay the State a civil penalty.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c690e9b7-4d7e-4a3e-a19b-5c7fec80b306" id="sec.156-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The amount of the penalty is 15% of the rent.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_eafd7c53-a7fe-4d1b-b682-fe5e6efec8ce" id="sec.156-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The penalty—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ccc43c23-c32b-405d-8627-07f530522af9" id="sec.156-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must be paid on the day after the last day for payment of the rent; and</txt></block></li><li guid="_08a60049-ec15-43d9-83ad-2f2dff4d56e4" id="sec.156-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is still payable even if the holder later pays the rent.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e2cb09b7-ce5a-4b50-a1c3-3f98732e99f9" id="sec.157" provision.type="other" spent.amends="0"><no>157</no><heading guid="_9847acf5-0ca6-4c39-8fdd-13739389c4d6" id="sec.157-he">Requirement to have development plan</heading><block><txt break.before="1">The holder of a petroleum lease must have a development plan for the lease.</txt><note guid="_4991b9d2-d855-43d7-9bb7-7978afca1909" id="sec.157-note" type="example"><heading guid="_a2a885a4-d802-473b-aeb8-44991fa7ab8d" id="sec.157-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_e6be3e43-9047-4cc9-91af-181dc353ba59" id="sec.157-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">The only development plan for a petroleum lease is its current initial or later development plan as approved under <intref check="valid" refid="ch.2-pt.2-div.4" target.guid="_20042571-c618-44c9-9361-f8620ebcf824">division 4</intref>.</txt></block></li><li guid="_839fa04c-b960-4d19-a098-c3b673093ddb" id="sec.157-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">For the requirements to lodge a proposed later development plan see <intref check="valid" refid="sec.159" target.guid="_684a7ca4-fe5f-47c8-a929-0382f9cc1e93">sections 159</intref>, <intref check="valid" refid="sec.170" target.guid="_d85a781b-a875-4e0f-8df9-beea519b6a1b">170</intref>, <intref check="valid" refid="sec.372" target.guid="_ca69f628-3c9d-4326-827f-8e1640ad6c55">372</intref> and <intref check="valid" refid="sec.790" target.guid="_0ae40873-0f6d-4440-a74c-a02fa5649d4f">790</intref>.</txt></block></li><li guid="_244058c7-12e3-4b4b-a72f-2a93a21b2324" id="sec.157-note-para1.3" provision.type="other"><no>3</no><block><txt break.before="0">For approval of proposed later development plans see <intref check="valid" refid="ch.2-pt.2-div.4" target.guid="_20042571-c618-44c9-9361-f8620ebcf824">division 4</intref>, <intref check="valid" refid="ch.2-pt.2-div.4-sdiv.5" target.guid="_5a644447-4370-4388-91c0-338340532823">subdivision 5</intref>.</txt></block></li></list></block></note></block></clause><clause affected.by.uncommenced="0" guid="_b73fc4b7-008b-4998-8442-194d5de2701f" id="sec.158" provision.type="other" spent.amends="0"><no>158</no><heading guid="_4f0a7d5e-77f8-48e7-8b16-e86e16a0cc40" id="sec.158-he">Compliance with development plan</heading><subclause affected.by.uncommenced="0" guid="_0d12014f-251d-4429-adeb-a4b245636364" id="sec.158-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A petroleum lease holder must comply with the development plan for the lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6275c8cc-45d1-401d-918f-c51ebbe425a3" id="sec.158-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.158-ssec.1" target.guid="_0d12014f-251d-4429-adeb-a4b245636364">subsection (1)</intref> does not apply to a failure to comply with the plan that is an act or omission by the holder to ensure compliance with an insufficiency of supply direction under the <legref check="valid" jurisd="QLD" target.doc.id="act-2003-029" target.version.series="92a3dd8a-4970-4226-b844-032b4aa4d911" type="act"><name emphasis="yes">Gas Supply Act 2003</name></legref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_684a7ca4-fe5f-47c8-a929-0382f9cc1e93" id="sec.159" provision.type="other" spent.amends="0"><no>159</no><heading guid="_dff6f005-0f1c-419f-a752-dc6fbe72de9f" id="sec.159-he">Obligation to lodge proposed later development plan</heading><subclause affected.by.uncommenced="0" guid="_9ba72e65-a17f-4175-aae9-34ac7b2ba5f5" id="sec.159-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section imposes an obligation on a petroleum lease holder to lodge a proposed later development plan for the lease.</txt><note guid="_76478bfc-de30-4666-8c3e-6465f3842f99" id="sec.159-ssec.1-note" type="example"><heading guid="_cbbd522d-758e-4f31-9a18-4b2bff81e376" id="sec.159-ssec.1-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_d8187778-6511-4c90-9b21-02cd8d63dee9" id="sec.159-ssec.1-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">For approval of the proposed plan, see <intref check="valid" refid="ch.2-pt.2-div.4" target.guid="_20042571-c618-44c9-9361-f8620ebcf824">division 4</intref>, <intref check="valid" refid="ch.2-pt.2-div.4-sdiv.5" target.guid="_5a644447-4370-4388-91c0-338340532823">subdivision 5</intref>.</txt></block></li><li guid="_5c2786d2-2e94-440b-a224-7a92771625ed" id="sec.159-ssec.1-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">If the holder wishes to renew the lease, a proposed later development plan must be included in the renewal application. See <intref check="valid" refid="sec.162" target.guid="_08121e31-5b9f-470f-984f-b16c4ac978ca">section 162</intref><intref check="valid" refid="sec.162-ssec.1" target.guid="_fb1cb7b6-3f24-4263-96b5-7180df35877f">(1)</intref>.</txt></block></li></list></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_e4d9f2b7-180c-4a64-9ed2-9b6c0d45bd3f" id="sec.159-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The obligation is complied with only if the proposed later development plan—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5d8dea72-a684-4851-a685-a9da4296d676" id="sec.159-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is lodged; and</txt></block></li><li guid="_54a1cb2d-4c76-441a-be42-20cfc16b5dd8" id="sec.159-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">complies with the later development plan requirements; and</txt></block></li><li guid="_c4b825d7-cfc7-4d8f-95dc-cc5d1440eed1" id="sec.159-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">is accompanied by the relevant fee.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_aa5b77db-49d8-4b37-8b71-c42fbae6f71b" id="sec.159-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A proposed later development plan must be lodged—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6accc1d9-0d10-4ba9-818a-ece20b0e4369" id="sec.159-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">at least 40, but no more than 100, business days before the end of the plan period for its current development plan (the <defterm guid="_8bc8c7fc-082b-4883-95c6-ce4f6f7fd917" id="sec.159-ssec.3-def.currentplanperiod" type="definition">current plan period</defterm>); or</txt></block></li><li guid="_6e2f1fb6-b163-4b5f-9684-a0e2c61d3b6e" id="sec.159-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">as soon as practicable after the holder proposes or becomes aware of a significant change to the nature and extent of an authorised activity that is not already dealt with under the current development plan for the lease.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0647ba64-2cbe-4bb4-98cf-100e1c628bbc" id="sec.159-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, if before the end of the current plan period, a decision is made not to approve a proposed later development plan lodged under <intref check="valid" refid="sec.159-ssec.3" target.guid="_aa5b77db-49d8-4b37-8b71-c42fbae6f71b">subsection (3)</intref>, the holder may, within the eligible balance of the period, lodge another proposed later development plan.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_46040ec2-c881-486b-b657-b66e3eb951ac" id="sec.159-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the holder does not lodge any proposed later development plan before the end of the current plan period or if <intref check="valid" refid="sec.159-ssec.4" target.guid="_0647ba64-2cbe-4bb4-98cf-100e1c628bbc">subsection (4)</intref> applies and the holder does not lodge another proposed later development plan within the eligible balance of the current plan period—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7713b63a-74db-435b-9d60-9b1aea99a7ae" id="sec.159-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the holder must be given a notice requiring the holder to lodge a proposed later development plan for the lease within 40 business days after the giving of the notice; and</txt></block></li><li guid="_c8a7c02f-87bd-4dc9-aa9c-a4a8f29d7afd" id="sec.159-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder must comply with the requirement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c2fe9ff1-4866-4091-93de-6d0a13f30573" id="sec.159-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_f5aaf41f-245e-4b24-a08b-1ddbb970013d" id="sec.159-ssec.6-def.eligiblebalance_"><txt break.before="1"><defterm guid="_70bb1616-7970-44d2-8ef3-dc26c6e1cf4e" id="sec.159-ssec.6-def.eligiblebalance" type="definition">eligible balance</defterm>, for a current plan period during which a decision mentioned in <intref check="valid" refid="sec.159-ssec.4" target.guid="_0647ba64-2cbe-4bb4-98cf-100e1c628bbc">subsection (4)</intref> is made, means the balance of the period, other than the appeal period for the decision.</txt></definition><definition affected.by.uncommenced="0" guid="_d526173c-00e8-4a5a-9089-c8f5c901512b" id="sec.159-ssec.6-def.relevantfee_"><txt break.before="1"><defterm guid="_86fe8ac0-3c71-422e-9d04-dfca76a39d7a" id="sec.159-ssec.6-def.relevantfee" type="definition">relevant fee</defterm>, for the lodgement of the proposed plan, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3853f807-c5c9-4444-a644-d52102eebf12" id="sec.159-ssec.6-def.relevantfee-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the proposed plan is lodged within the time required under <intref check="valid" refid="sec.159-ssec.3" target.guid="_aa5b77db-49d8-4b37-8b71-c42fbae6f71b">subsection (3)</intref>—the fee prescribed under a regulation; or</txt></block></li><li guid="_6f2f1037-dc73-4981-bc1a-320943948c63" id="sec.159-ssec.6-def.relevantfee-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the proposed plan is lodged after the time required under <intref check="valid" refid="sec.159-ssec.3" target.guid="_aa5b77db-49d8-4b37-8b71-c42fbae6f71b">subsection (3)</intref> and—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2dfcde55-9c05-4c93-90c3-78320303735b" id="sec.159-ssec.6-def.relevantfee-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">if it is lodged under <intref check="valid" refid="sec.159-ssec.4" target.guid="_0647ba64-2cbe-4bb4-98cf-100e1c628bbc">subsection (4)</intref>—nil; or</txt></block></li><li guid="_d89391d0-ae2d-4409-8337-d8a12b648ff5" id="sec.159-ssec.6-def.relevantfee-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if it is not lodged under <intref check="valid" refid="sec.159-ssec.4" target.guid="_0647ba64-2cbe-4bb4-98cf-100e1c628bbc">subsection (4)</intref>—an amount that is 10 times the prescribed fee.</txt></block></li></list></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_bcc30333-b12f-4f03-bdf7-c0d26f798390" id="sec.160" provision.type="other" spent.amends="0"><no>160</no><heading guid="_19d01cf7-2515-4f7e-82ad-ed951dc6be37" id="sec.160-he">Consequence of failure to comply with notice to lodge proposed later development plan</heading><subclause affected.by.uncommenced="0" guid="_7dd4e4ce-bab4-48bd-a178-317d1bcf72e5" id="sec.160-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a petroleum lease holder does not comply with a requirement under <intref check="valid" refid="sec.159" target.guid="_684a7ca4-fe5f-47c8-a929-0382f9cc1e93">section 159</intref><intref check="valid" refid="sec.159-ssec.5" target.guid="_46040ec2-c881-486b-b657-b66e3eb951ac">(5)</intref><intref check="valid" refid="sec.159-ssec.5-para1.a" target.guid="_7713b63a-74db-435b-9d60-9b1aea99a7ae">(a)</intref>, the lease is cancelled.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7b226a98-2b2e-4203-8e33-9ed76c530672" id="sec.160-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the cancellation does not take effect until the holder is given a notice stating that the lease has been cancelled because of the operation of <intref check="valid" refid="sec.160-ssec.1" target.guid="_7dd4e4ce-bab4-48bd-a178-317d1bcf72e5">subsection (1)</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_17470eb0-5d7e-4a86-849e-5da55f3f528f" id="sec.160A" provision.type="other" spent.amends="0"><no>160A </no><heading guid="_ae20862d-6316-4c2a-9e11-667afe1a73a3" id="sec.160A-he">Power to impose or amend condition if changed holder of petroleum lease</heading><subclause affected.by.uncommenced="0" guid="_340653c6-6f6d-454a-8134-5306ccbf86da" id="sec.160A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if 1 of the following changes happens—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6bf67af5-22e8-4ae3-9015-ed00de583dc1" id="sec.160A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an entity starts or stops controlling the holder of a petroleum lease under the Corporations Act, section 50AA; </txt></block></li><li guid="_142d4e46-f0cd-45b6-a8ea-80b426e4d42c" id="sec.160A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder of a petroleum lease starts or stops being a subsidiary of a corporation under the Corporations Act, section 46.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d31b5736-fa78-4c72-b352-6826f99e3d14" id="sec.160A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister may consider whether, after the change, the holder of the petroleum lease has the financial and technical resources to comply with the conditions of the petroleum lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f2d41d86-5e22-4523-b0eb-036d238b51dc" id="sec.160A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the Minister considers the holder of the petroleum lease may not have the financial and technical resources to comply with conditions of the petroleum lease, the Minister may impose another condition on, or amend a condition of, the petroleum lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_204ad1b7-92b3-4816-bca7-52c9d0587430" id="sec.160A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the Minister believes a change mentioned in subsection (1) may have happened, the Minister may require the holder of the petroleum lease to give the Minister information or a document about whether or not the change has happened.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8437d60a-d763-414c-a355-ce77d3e74ca8" id="sec.160A-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Before deciding to impose another condition on, or amend a condition of, the petroleum lease under subsection (3), the Minister may require the holder of the petroleum lease to give the Minister information or a document the Minister requires to make the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3eddc68b-5eef-4353-9da7-2592c76603ac" id="sec.160A-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">A requirement under subsection (4) or (5) must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6e2c5771-0f87-47d3-be52-757458e7b60c" id="sec.160A-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be made by notice given to the holder; and</txt></block></li><li guid="_752cfbb5-0004-40c8-85b7-7148531575e8" id="sec.160A-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state a period of at least 10 business days within which the holder must comply with the requirement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_26eccbca-21d6-4743-b251-e96136cd14c0" id="sec.160A-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">Before deciding to impose another condition on, or amend a condition of, the petroleum lease under subsection (3), the Minister must give the holder of the lease a notice stating—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_49aad280-aea7-4775-88e0-5d71d7b0d81b" id="sec.160A-ssec.7-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the proposed decision; and</txt></block></li><li guid="_0fbe8d4c-571a-4e1e-bc09-ee0715025b67" id="sec.160A-ssec.7-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the reasons for the proposed decision; and</txt></block></li><li guid="_251d4394-9045-4447-80e0-43bf076534b5" id="sec.160A-ssec.7-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that the holder may, within 10 business days after the notice is given, make submissions to the Minister about the proposed decision.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_302e86ce-8406-45a9-a25f-d4188fe622b7" id="sec.160A-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">The Minister may extend the period mentioned in subsection (6)(b) or (7)(c) by notice given to the holder of the petroleum lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_914d3a18-87c5-4886-bc5a-a2b37572f330" id="sec.160A-ssec.9" provision.type="other"><no>(9)</no><block><txt break.before="0">In deciding whether to impose another condition on, or amend a condition of, the petroleum lease under subsection (3), the Minister—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c85ab79f-fcf2-4b17-a100-eab47b8814f5" id="sec.160A-ssec.9-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must consider information or a document, if any, given under subsection (6)(b) or (7)(c); and</txt></block></li><li guid="_38a794f3-e29e-4de1-a21d-458dd302167d" id="sec.160A-ssec.9-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">may consider any other matter the Minister considers relevant.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_eab66ddd-c276-49ef-b23c-6e2b7434aa81" id="sec.160A-ssec.10" provision.type="other"><no>(10)</no><block><txt break.before="0">If the Minister decides to impose another condition on, or amend a condition of, the petroleum lease under subsection (3), the Minister must, as soon as practicable after making the decision, give the holder a notice stating the decision and the reasons for the decision.</txt></block></subclause></clause></subdivision></division><division affected.by.uncommenced="0" guid="_d22f629a-3d37-46e1-8859-aa3126540bf2" id="ch.2-pt.2-div.6"><no>Division 6</no><heading guid="_70741d4a-5cf4-4595-b11f-7b9e53248039" id="ch.2-pt.2-div.6-he">Renewals</heading><clause affected.by.uncommenced="0" guid="_ac1dd74a-d37b-49fd-acb6-a45b58b97471" id="sec.161" provision.type="other" spent.amends="0"><no>161</no><heading guid="_3e1dd1ee-26d5-4fa9-bf9d-07bf0dc08d31" id="sec.161-he">Conditions for renewal application</heading><subclause affected.by.uncommenced="0" guid="_21e4b50c-2d8e-4a2e-9896-370ee127653a" id="sec.161-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A petroleum lease holder may apply to renew the lease only if none of the following is outstanding—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_08e4cb5d-595f-41c1-b53a-612613b466e8" id="sec.161-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">annual rent for the lease;</txt></block></li><li guid="_d40fdd83-9e94-4c22-92b0-6eba1d031144" id="sec.161-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a civil penalty under <intref check="valid" refid="sec.156" target.guid="_303a3992-6f4c-4625-83aa-a9c8be8a6db2">section 156</intref> for nonpayment of annual rent;</txt></block></li><li guid="_ff874db1-6b54-4677-b1d5-58121d7e78a6" id="sec.161-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">interest payable under <intref check="valid" refid="sec.588" target.guid="_a4bc919c-7264-46d2-bbaa-0d47579c4e14">section 588</intref> on annual rent or a civil penalty;</txt></block></li><li guid="_227a6444-6f95-4cf1-96f4-8f811d20f7d0" id="sec.161-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a royalty-related amount payable by the holder;</txt></block></li><li guid="_fb4e24e1-067b-416c-8a0e-89cda585c5c6" id="sec.161-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">security for the lease, as required under <intref check="valid" refid="sec.488" target.guid="_13f8de44-15a4-4a47-a9af-6464bc374dda">section 488</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6441d399-59c8-4dab-ba8a-b057abbb8644" id="sec.161-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Also, the application can not be made—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6d018510-23f1-488a-b7b2-c380c92ee747" id="sec.161-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">more than 80 business days before the end of the term of the lease; or</txt></block></li><li guid="_a2e9aa80-236c-4343-992d-cfb1a8ae248d" id="sec.161-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">after the lease has ended.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8e26dcb2-023a-4fb3-981a-61b34dfb44bf" id="sec.161-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the Minister may allow the application to be made up to 2 years before the end of the term of the lease if the Minister is of the opinion that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_68c0dad8-c6ea-4622-8b18-c09329723372" id="sec.161-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a storage agreement is in force for the lease or the holder has negotiated, or is negotiating, a proposed storage agreement for the lease; and</txt></block></li><li guid="_aa3ef60b-3f81-4db1-883d-4994d019a402" id="sec.161-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the agreement or proposed agreement will be in force after the proposed renewed lease takes effect.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_08121e31-5b9f-470f-984f-b16c4ac978ca" id="sec.162" provision.type="other" spent.amends="0"><no>162</no><heading guid="_a5cc9d06-389d-45f3-88c4-1b01d6bb3818" id="sec.162-he">Requirements for making renewal application</heading><subclause affected.by.uncommenced="0" guid="_fb1cb7b6-3f24-4263-96b5-7180df35877f" id="sec.162-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The application must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_09fc0fb8-5c02-4683-a681-a5bc28ab5e09" id="sec.162-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li guid="_806f7646-7899-455b-b5b0-cc49e8e767ab" id="sec.162-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state whether or not the development plan for the petroleum lease has been complied with; and</txt></block></li><li guid="_b04a96c1-1cca-4840-80ba-56bcec9d772c" id="sec.162-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the development plan has not been complied with—state details of, and the reasons for, each noncompliance; and</txt></block></li><li guid="_878574a3-ae9e-4b48-91b3-80c052e37640" id="sec.162-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">include a proposed later development plan for the renewed lease; and</txt></block></li><li guid="_dc974953-fb3a-46e2-8d17-ad709fe35224" id="sec.162-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">state whether or not the applicant has complied with <intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref>, <intref check="valid" refid="ch.5-pt.7" target.guid="_01d524f3-ca84-4e41-ab48-d8ec12875570">part 7</intref>, for reports required to be lodged in relation to the lease; and</txt></block></li><li guid="_abdf7547-5097-4c75-8440-9a2dd750537e" id="sec.162-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">be accompanied by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b0640b15-a6d4-4aa8-a500-5a4571f1314e" id="sec.162-ssec.1-para1.f-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the application fee prescribed under a regulation; and</txt></block></li><li guid="_f990d1e9-4557-470a-8884-8e89443428b0" id="sec.162-ssec.1-para1.f-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the application is made less than 40 business days before the end of the term of the lease—an amount that is 10 times the application fee.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c49384d7-4fed-4a15-ac4a-f280f5f431f8" id="sec.162-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The proposed later development plan must comply with the later development plan requirements.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0f91626a-41b6-452d-a3dc-cde0f7c8d05b" id="sec.163" provision.type="other" spent.amends="0"><no>163</no><heading guid="_694e554d-e3f2-4ffe-8ce9-d63adfa09527" id="sec.163-he">Continuing effect of lease for renewal application</heading><subclause affected.by.uncommenced="0" guid="_b08608ca-4e4c-45d5-9395-1c9ce808c947" id="sec.163-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the term of the petroleum lease ends before the application is decided.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b4781b1b-d9e2-4d17-9caf-2864cc97a5ff" id="sec.163-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite the ending of the term, the lease continues in force until the earlier of the following to happen—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2085450a-7f81-4c86-8022-623d31a968b7" id="sec.163-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the start of any renewed term of the lease;</txt></block></li><li guid="_3490a5b8-449e-4f00-8354-f213a1f0a68f" id="sec.163-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a refusal of the application takes effect;</txt></block></li><li guid="_409aa186-2266-4082-b880-99cc7815925e" id="sec.163-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the application is withdrawn;</txt></block></li><li guid="_e1b37faa-d883-4278-bc88-ccd703b98db9" id="sec.163-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the lease is cancelled under this Act.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a5fc166b-cea2-4c2e-9de0-2c6682f5202f" id="sec.163-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the lease is renewed, <intref check="valid" refid="sec.163-ssec.2" target.guid="_b4781b1b-d9e2-4d17-9caf-2864cc97a5ff">subsection (2)</intref> is taken never to have applied for the period from the end of the term of the lease being renewed, as stated in that lease.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_cc0041d4-9257-4041-b504-057ce533e35e" id="sec.164" provision.type="other" spent.amends="0"><no>164</no><heading guid="_df9cbcfe-a7fe-418a-ba57-d560420bd5e9" id="sec.164-he">Deciding application</heading><subclause affected.by.uncommenced="0" guid="_0620c883-b6f3-4411-8dac-943b5af7fc8e" id="sec.164-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may grant or refuse the renewal.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f7d87c14-ae79-4677-86e8-f6df17ee4da9" id="sec.164-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_27cafa18-34d0-4d64-920b-4a1e56683cfd" id="sec.164-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before deciding to grant the renewal, the Minister must decide whether to approve the applicant’s proposed later development plan for the renewed petroleum lease; and</txt></block></li><li guid="_972fa9d4-ea91-416d-9df2-502efac27970" id="sec.164-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the renewal can not be granted unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_880ef1b7-4668-4388-bed3-100e5dcaa58a" id="sec.164-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the proposed plan has been approved; and</txt></block></li><li guid="_ff98f26d-21ef-4060-b81d-eeed3c628be0" id="sec.164-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the Minister considers the applicant satisfies the capability criteria and has substantially complied with the lease being renewed; and</txt></block></li><li guid="_45383a1b-f5f1-4d48-9910-69e93848426c" id="sec.164-ssec.2-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">a relevant environmental authority for the renewed lease has been issued.</txt></block></li></list></block></li></list><note guid="_6ee12da6-617b-45d9-bc74-4c943ba737da" id="sec.164-ssec.2-note" type="example"><heading guid="_9984d364-87fe-4b32-b6c7-b714c823f6d3" id="sec.164-ssec.2-note-he">Note—</heading><block><txt break.before="1">If the application relates to acquired land, see also <intref check="valid" refid="sec.30AC" target.guid="_9f663574-cdda-4e64-9f8f-6c6102041022">section 30AC</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_696b65e0-89f9-4ace-9849-52f11823177a" id="sec.164-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, the Minister may, as a condition of deciding to grant the application, require the applicant to do all or any of the following within a stated reasonable period—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1bac4ec6-2739-4e44-81a1-95ad74ed9f81" id="sec.164-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">pay the annual rent for the first year of the renewed lease;</txt></block></li><li guid="_6d431d6c-c4db-4c37-9e5d-153f40f2c35d" id="sec.164-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give, under <intref check="valid" refid="sec.488" target.guid="_13f8de44-15a4-4a47-a9af-6464bc374dda">section 488</intref>, security for the renewed lease.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_17f243a0-e1e2-4213-a3e6-1cbae6cb380f" id="sec.164-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the applicant does not comply with the requirement, the application may be refused.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7c86a678-edd7-4445-8027-62b4d3226729" id="sec.165" provision.type="other" spent.amends="0"><no>165</no><heading guid="_5fe4ddc9-f22b-4461-8e45-3330f94cd8b1" id="sec.165-he">Provisions and term of renewed lease</heading><subclause affected.by.uncommenced="0" guid="_ce44df31-2535-41d3-bec2-b6e46f371dd5" id="sec.165-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Subject to this section, <intref check="valid" refid="sec.123" target.guid="_ef44ece4-3399-4e95-8180-52c9dbb8d1b6">section 123</intref> applies to the renewed petroleum lease as if it were a petroleum lease granted under <intref check="valid" refid="ch.2-pt.2-div.2" target.guid="_3fb4383f-3f81-4aa6-b3a5-b4e62287dd47">division 2</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_aaa81421-4945-45cb-ae00-81ac2e12fd4c" id="sec.165-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The conditions or other provisions of the renewed lease may be different from the conditions or other provisions of the petroleum lease being renewed.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5d263103-f1f1-4842-86c4-52fc8f03be92" id="sec.165-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The area of the renewed lease must not be more than the area of the petroleum lease being renewed immediately before the renewed lease is to take effect.</txt><note guid="_cd7b3b7c-25f0-4ea2-aa57-dd8801b2a49b" id="sec.165-ssec.3-note" type="example"><heading guid="_793b6830-b149-467f-bb85-271427e11134" id="sec.165-ssec.3-note-he">Note—</heading><block><txt break.before="1">See, however, <intref check="valid" refid="sec.30AC" target.guid="_9f663574-cdda-4e64-9f8f-6c6102041022">section 30AC</intref><intref check="valid" refid="sec.30AC-ssec.3" target.guid="_75f7d590-62c4-4ad0-89d9-66d823de1e55">(3)</intref> in relation to acquired land that was previously in the area of the petroleum lease being renewed.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_92777843-e595-4a1e-8c83-adaab9728857" id="sec.165-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the renewal is decided before the end of the term of the petroleum lease being renewed as stated in that lease (the <defterm guid="_0df84226-ad29-4502-8342-21bd3857510e" id="sec.165-def.previousterm" type="definition">previous term</defterm>), the term of the renewed lease is taken to start from the end of the previous term.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1b4b0d25-b4b5-4797-9d02-39c76aebd175" id="sec.165-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the renewed lease is decided after the previous term, the term of the renewed lease starts immediately after the end of the previous term, but—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_08b3e7c4-924d-4e79-ba15-c65c8cb866e3" id="sec.165-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the conditions of the renewed lease do not start until the lease holder is given notice of them; and</txt></block></li><li guid="_e6c9e666-d943-46e7-a938-a4866f1be60d" id="sec.165-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">until the notice is given, the conditions of the petroleum lease being renewed apply to the renewed lease as if they were its conditions.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3e3d1f65-4a12-4c56-bea6-1581400416be" id="sec.165-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The term of the renewed lease must not be more than—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_62ddb827-097e-4e70-a2a5-ec77cf61b72d" id="sec.165-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if it has not been previously renewed—the original term of the lease; or</txt></block></li><li guid="_6a1aa30e-4b47-4c8c-8a52-ef6821205448" id="sec.165-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if it has been previously renewed—its last renewed term.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_9a5e836e-0458-45fa-b062-ffaad28e4fc3" id="sec.166" provision.type="other" spent.amends="0"><no>166</no><heading guid="_7df7e9d3-1e8f-4f37-ac77-77edad89d08e" id="sec.166-he">Information notice about refusal</heading><block><txt break.before="1">On refusal of the application, the applicant must be given an information notice about the decision to refuse.</txt></block></clause><clause affected.by.uncommenced="0" guid="_91ebafd2-bfa1-446e-aed3-cc5848c4983e" id="sec.167" provision.type="other" spent.amends="0"><no>167</no><heading guid="_6397e0cb-13db-4d89-bf09-d8e1b34b6e36" id="sec.167-he">When refusal takes effect</heading><block><txt break.before="1">A refusal of the application does not take effect until the end of the appeal period for the decision to refuse.</txt></block></clause></division><division affected.by.uncommenced="0" guid="_2bb22cfe-e8d5-4c9d-9726-0c2f089841e4" id="ch.2-pt.2-div.7"><no>Division 7</no><heading guid="_291690ad-d93d-4d47-b9d3-1c234b456ea0" id="ch.2-pt.2-div.7-he">Miscellaneous provisions</heading><subdivision affected.by.uncommenced="0" guid="_5a909c59-a555-4d51-94f3-8b365315fc5b" id="ch.2-pt.2-div.7-sdiv.1"><no>Subdivision 1</no><heading guid="_4a6cb664-c8bc-4f82-960d-50875bb233f3" id="ch.2-pt.2-div.7-sdiv.1-he">Area of petroleum lease</heading><clause affected.by.uncommenced="0" guid="_734a0050-dc06-4a36-a451-0fd4eeda33ba" id="sec.168" provision.type="other" spent.amends="0"><no>168</no><heading guid="_6f061c4b-089a-4d69-a651-7c4cef48fc45" id="sec.168-he">Area of petroleum lease</heading><subclause affected.by.uncommenced="0" guid="_50b917f9-c8ea-4e06-bac0-532387ef9464" id="sec.168-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section provides for the area of a petroleum lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7bba70ac-7403-4140-9c35-43bd6263a894" id="sec.168-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The area does not include excluded land for the lease.</txt><note guid="_ded0530c-b863-4ff5-995e-3bcc7c88e13c" id="sec.168-ssec.2-note" type="example"><heading guid="_d8c82028-00a3-485e-b477-f4fdd616ac75" id="sec.168-ssec.2-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.30AB" target.guid="_4abe0a1b-ba8f-40b0-b76e-1e1864fb56ff">section 30AB</intref><intref check="valid" refid="sec.30AB-ssec.3" target.guid="_ce5296c7-9c9d-41c8-92ee-dfb0ac036d8e">(3)</intref> if land in the petroleum lease’s area is taken under a resumption law.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_e1bfec66-ef7f-41cd-a1ce-b267821ac139" id="sec.168-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Unless the Minister otherwise decides, the area must form a single parcel of land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_db0b978c-7889-4a1d-9c77-094d5987451f" id="sec.168-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The area must not include any of the following (<defterm guid="_3ea771f3-df70-4fde-8cc2-fc939f7322d6" id="sec.168-def.unavailableland" type="definition">unavailable land</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e1e10ac7-b17f-42f9-9f3f-6ca4d329df4f" id="sec.168-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">land in the area of another petroleum tenure, other than land that will, under <intref check="valid" refid="sec.101" target.guid="_ecb16f24-7357-4c3c-87b6-6fbc88f80008">section 101</intref>, cease to be included in the area of an authority to prospect on the grant of the lease;</txt></block></li><li guid="_1da0993e-9d0d-49eb-8bab-473369b6caa1" id="sec.168-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">excluded land for another petroleum tenure;</txt></block></li><li guid="_6b293edd-e733-44ee-a762-7a446724139d" id="sec.168-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">land in the area of a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> petroleum tenure;</txt></block></li><li guid="_e9cc9f6f-a238-4fb9-b776-37517ce84fad" id="sec.168-ssec.4-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">excluded land for a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> petroleum tenure;</txt></block></li><li guid="_1cfea2db-5f12-496c-8e16-cb724bfec2c2" id="sec.168-ssec.4-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">land that a regulation prescribes as land over which a petroleum lease can not be granted.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2d9d423a-e660-44dd-9c63-e3e0eaf02edf" id="sec.168-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">To remove any doubt, it is declared that if land within any sub-block that the lease states is included in the area of the lease ceases to be unavailable land, the cessation itself does not cause the land to be within the area of the lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_09a98f20-ae69-45c1-be9c-389a11f484fc" id="sec.168-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">For <intref check="valid" refid="sec.168-ssec.5" target.guid="_2d9d423a-e660-44dd-9c63-e3e0eaf02edf">subsection (5)</intref>, if the lease states that its area includes land within a block without including or excluding any particular sub-block, the reference to the block is a reference to all sub-blocks within the block.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_78410fd7-974e-4d85-b9c3-62b0c7c07103" id="sec.168-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">The area may include a part of a sub-block only if the part is all areas within the sub-block that are left after taking away all unavailable land within the sub-block (a <defterm guid="_a5f64b14-4e5f-40eb-af4f-bf7363c8341b" id="sec.168-def.residualsubblock" type="definition">residual sub-block</defterm>).</txt><note guid="_75826f45-0675-4a9f-84b5-dd1191dda3e6" id="sec.168-ssec.7-note" type="example"><heading guid="_e37173c6-cefe-4e36-8933-a04631d4466f" id="sec.168-ssec.7-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.30AB" target.guid="_4abe0a1b-ba8f-40b0-b76e-1e1864fb56ff">section 30AB</intref><intref check="valid" refid="sec.30AB-ssec.3" target.guid="_ce5296c7-9c9d-41c8-92ee-dfb0ac036d8e">(3)</intref> if land in the petroleum lease’s area is taken under a resumption law.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" change="del" guid="_c248c298-6310-4474-bc43-12d3332a5ee7-del" id="sec.168-ssec.8-del" provision.type="other"><no>(8)</no><block><txt break.before="0">The area must be no more than 75 sub-blocks or residual sub-blocks, in any combination.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_bef303e4-aef4-40e0-ab7b-a57a6df9306e" id="sec.169" provision.type="other" spent.amends="0"><no>169</no><heading guid="_943262fc-d71e-42ac-ad54-77898e07ab1f" id="sec.169-he">Minister’s power to decide excluded land</heading><subclause affected.by.uncommenced="0" guid="_7e2bf92e-cedf-4e3f-a648-5a6d7e3da7be" id="sec.169-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may decide excluded land for a petroleum lease or proposed petroleum lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_05b9f1e7-4d71-4ee6-ac14-c39294ab38ee" id="sec.169-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the power under <intref check="valid" refid="sec.169-ssec.1" target.guid="_7e2bf92e-cedf-4e3f-a648-5a6d7e3da7be">subsection (1)</intref> may be exercised only when the Minister is deciding whether to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9fbca865-af5d-4227-a136-2d944b19af51" id="sec.169-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">grant or renew the lease; or</txt></block></li><li guid="_c50b6ce9-8192-4905-80c1-7de54681697e" id="sec.169-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">approve any later development plan for the lease.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f9048ebb-e47d-4331-9fc0-70671a98fb86" id="sec.169-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, excluded land—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_64b20fa5-9b0a-4694-a82e-4a2ef81b7222" id="sec.169-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must be within any sub-block that the lease states is included in the area of the lease; and</txt></block></li><li guid="_ed369b73-505b-437d-8903-5a4eef7a38b1" id="sec.169-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">can not be a whole sub-block.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e141a55d-3574-4b0b-90c1-4021f4b7983f" id="sec.169-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">For <intref check="valid" refid="sec.169-ssec.3" target.guid="_f9048ebb-e47d-4331-9fc0-70671a98fb86">subsection (3)</intref><intref check="valid" refid="sec.169-ssec.3-para1.a" target.guid="_64b20fa5-9b0a-4694-a82e-4a2ef81b7222">(a)</intref>, if the register—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8d251fd3-a793-4a66-a777-a355044a81b5" id="sec.169-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">states that the lease’s area includes land within a block; but</txt></block></li><li guid="_395d6141-ba94-440f-8bce-3755862a071c" id="sec.169-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">does not include or exclude any particular sub-block within that block;</txt></block></li></list></block><block><txt break.before="1">the reference to the block in the register is a reference to all sub-blocks within the block, other than any sub-block that is completely within the area of another petroleum tenure or a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> petroleum tenure.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5ce616b5-e9e0-41b6-ab60-27f00930e13e" id="sec.169-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Excluded land may be described in a way the Minister considers appropriate, including, for example, by area or by reference to a stated type of land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bc2e24d9-ac60-4ee0-8cb6-69d0924c65c7" id="sec.169-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">Land ceases to be excluded land for a petroleum lease if, for any reason, the sub-block in which the land is located ceases to be in the area of the lease.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d85a781b-a875-4e0f-8df9-beea519b6a1b" id="sec.170" provision.type="other" spent.amends="0"><no>170</no><heading guid="_97bce336-c73e-470e-bd3a-4644533a59da" id="sec.170-he">Minister may add excluded land</heading><subclause affected.by.uncommenced="0" guid="_2d3fefb1-cc05-4ca7-be8f-f9e501281990" id="sec.170-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may amend a petroleum lease by adding excluded land for the lease to its area only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d2cafe7f-09f9-41b4-a404-7eda2e46e254" id="sec.170-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the lease as amended complies with <intref check="valid" refid="sec.168" target.guid="_734a0050-dc06-4a36-a451-0fd4eeda33ba">section 168</intref>; and</txt></block></li><li guid="_ebccf3cd-9375-4535-9e28-71862f1f494f" id="sec.170-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the lease holder consents.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3f066959-b116-4074-8dfd-b75880cff4f0" id="sec.170-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If land mentioned in <intref check="valid" refid="sec.170-ssec.1" target.guid="_2d3fefb1-cc05-4ca7-be8f-f9e501281990">subsection (1)</intref> is added to the area of the lease, the land ceases to be excluded land for the lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e5edf8a3-3431-47f0-80bf-19baee72937d" id="sec.170-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister may amend the provisions of the lease in a way that reflects the inclusion of the excluded land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1672d6f2-ef66-451f-8bb6-f9b28018b2c3" id="sec.170-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Also, the Minister may give the lease holder a notice—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d7de0fcd-068b-41ff-8134-ae43228a136c" id="sec.170-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">withdrawing, from a stated day, the approval of the development plan for the lease; and</txt></block></li><li guid="_bfc7d5f2-40ba-4ecf-b3c2-5e8b81c56352" id="sec.170-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">directing the holder to lodge a proposed later development plan for the lease that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_79bb93b1-3719-469e-ae0c-19890675bd74" id="sec.170-ssec.4-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">complies with the later development plan requirements; and</txt></block></li><li guid="_d1f0a11e-fb41-486b-a610-d99e01232178" id="sec.170-ssec.4-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">changes the development plan for the lease to reflect the inclusion of the excluded land.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3c095917-bbd4-4f6f-87bb-dac4b93a14cc" id="sec.170-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The amended provisions of the lease or the proposed later development plan must not be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5e17850a-4498-4ae3-8915-81252d7817fa" id="sec.170-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">inconsistent with the mandatory conditions for petroleum leases; or</txt></block></li><li guid="_48300a52-444e-4897-bd12-2bcbf5e267d1" id="sec.170-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the same as, or substantially the same as, or inconsistent with, any relevant environmental condition for the lease.</txt></block></li></list></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" change="ins" guid="_e95bc672-c4f4-498b-90af-cdfe82ae4191" id="ch.2-pt.2-div.7-sdiv.1A"><no>Subdivision 1A</no><heading guid="_03a14573-2af5-4c08-9dd4-4d205a83b408" id="ch.2-pt.2-div.7-sdiv.1A-he">Amalgamating particular petroleum leases</heading><clause affected.by.uncommenced="0" guid="_c4767ce9-42e7-41ae-9cbb-8a81e31dd3da" id="sec.170A" provision.type="other" spent.amends="0"><no>170A </no><heading guid="_d535cd5d-3f7f-43cc-ae60-594d795dda6a" id="sec.170A-he">Applying to amalgamate petroleum leases</heading><subclause affected.by.uncommenced="0" guid="_abaf5298-047d-4861-a214-86b617225efb" id="sec.170A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person may apply to the Minister to amalgamate 2 or more petroleum leases (each an <defterm guid="_6519705c-d017-498b-9153-a25d6edfae20" id="sec.170A-def.individuallease" type="definition">individual lease</defterm>) into a single petroleum lease (the <defterm guid="_352d6b15-febf-4ae3-acbf-3630ce284779" id="sec.170A-def.amalgamatedlease" type="definition">amalgamated lease</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d58f327f-4aeb-4fea-b516-1c84eec63ddf" id="sec.170A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An application can be made only if— </txt><list number.type="manual" unnumbered.indent="0"><li guid="_fd664469-986c-417c-8c69-d626f3c87fc2" id="sec.170A-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">all of the holders of the individual leases agree to the proposed amalgamation; and</txt></block></li><li guid="_358518f8-113d-4eeb-b3bf-bf363003bc34" id="sec.170A-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holders of the amalgamated lease will be the same as the holders of the individual leases.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_dc2a35c2-b3cf-4685-b47e-f5b4be54eff0" id="sec.170A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, a person can not make an application under subsection (1) if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_759eab1b-07a7-4666-a049-0b43d9064a6e" id="sec.170A-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">any of the holders of the individual leases have not complied with a provision of this Act; or</txt></block></li><li guid="_9f55429d-dc03-4ecf-ba7a-ee08b278a5bb" id="sec.170A-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any of the following amounts is outstanding in relation to an individual lease—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8fbcae3f-3398-4669-8500-78f085253fb0" id="sec.170A-ssec.3-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">annual rent;</txt></block></li><li guid="_915d3e6a-eba2-4f33-8ebe-2b0c086e8cce" id="sec.170A-ssec.3-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a civil penalty under section 156 for non-payment of annual rent;</txt></block></li><li guid="_696e963a-3bf4-41e0-98e8-1314bb92817d" id="sec.170A-ssec.3-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">interest payable under section 588 on annual rent or a civil penalty;</txt></block></li><li guid="_50608fa4-f73a-4732-b0ea-81e1b2104e27" id="sec.170A-ssec.3-para1.b-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">a royalty-related amount payable by the holder;</txt></block></li><li guid="_b44b635a-350e-43ae-85a5-ebd45d840d07" id="sec.170A-ssec.3-para1.b-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">security required under section 488.</txt></block></li></list></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_010cb6ea-c19c-40ee-b153-96c9010f2252" id="sec.170B" provision.type="other" spent.amends="0"><no>170B </no><heading guid="_115c8e21-4f55-4678-ac99-c78ea7fae5bc" id="sec.170B-he">Applying to amalgamate 1923 Act leases</heading><subclause affected.by.uncommenced="0" guid="_96ebb32d-b794-4412-bacd-c6d5aa81cf95" id="sec.170B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person may apply to the Minister to amalgamate 2 or more 1923 Act leases (each also an <defterm guid="_c451599d-1351-4dca-aa33-ce4bb9f803f6" id="sec.170B-def.individuallease" type="definition">individual lease</defterm>) into a single petroleum lease (also the <defterm guid="_1e528c83-acfa-4fe3-833a-6ceb58a5e3a0" id="sec.170B-def.amalgamatedlease" type="definition">amalgamated lease</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_545e2aa9-c5be-4e2b-99ab-4960ee52d782" id="sec.170B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An application can be made only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9f976574-964d-48ac-9d79-3fe7b883765a" id="sec.170B-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the holder of each individual lease has also applied under section 908 for a petroleum lease for all or part of the area of the lease; and</txt></block></li><li guid="_66f7ec54-6e13-4195-b301-93e4dd0c1fc8" id="sec.170B-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">all of the holders of the individual leases agree to the proposed amalgamation; and</txt></block></li><li guid="_8b2168c7-50ac-4d2a-abd3-2071b89c11c0" id="sec.170B-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the holders of the amalgamated lease will be the same as the holders of the individual leases.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1776f860-7be6-43a7-b564-6ac8961cb95e" id="sec.170B-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, a person can not make an application under subsection (1) if any of the holders of individual leases have not complied with a provision of the 1923 Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9df6a3f8-879b-48a9-b9fb-34adb1c590fd" id="sec.170B-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the application under section 908 is withdrawn, the application for amalgamation is taken to be withdrawn.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8d5fdc2d-1459-4bed-b4a4-2d87e7f814bb" id="sec.170B-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the application under section 908 is rejected, the application for amalgamation is taken to have lapsed.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_15ce23e9-bf94-4d5c-84e5-d3515b9be7d1" id="sec.170C" provision.type="other" spent.amends="0"><no>170C </no><heading guid="_2ace22c5-137d-458a-94f0-dc7f52824ab3" id="sec.170C-he">Requirements for making application</heading><block><txt break.before="1">The application must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_08f8f073-3716-4f02-867e-5306d842775c" id="sec.170C-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li guid="_7572746a-0ae2-4567-9f86-575690ab22b3" id="sec.170C-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">include a proposed development plan for the amalgamated lease that, to the extent possible, is the same as the development plans for the individual leases; and</txt></block></li><li guid="_c7d537ac-e470-4537-b5dd-61d83dcd547c" id="sec.170C-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">be accompanied by the fee prescribed by regulation.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_74a654d0-d456-4359-bbf6-eda9f7f562f3" id="sec.170D" provision.type="other" spent.amends="0"><no>170D </no><heading guid="_521dfccc-c91f-407f-a532-5c35b91aaf5f" id="sec.170D-he">Deciding application</heading><subclause affected.by.uncommenced="0" guid="_ccc9f86a-1f16-4b11-91b6-e98ca51ef613" id="sec.170D-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may decide to grant or refuse to grant the amalgamated lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7ba03f51-58bf-40e2-8540-6c3109c4dc0b" id="sec.170D-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0946081b-20c4-4c78-aefc-8c0ee506cf0e" id="sec.170D-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before deciding to grant the amalgamated lease, the Minister must decide whether to approve the proposed development plan for the amalgamated lease; and</txt></block></li><li guid="_a2793c97-55fe-4c0c-944f-5767a17d6d72" id="sec.170D-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the amalgamated lease can not be granted unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_65a10a04-e916-4581-ae23-f94d43196f27" id="sec.170D-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the proposed development plan for the amalgamated lease has been approved; and</txt></block></li><li guid="_1eaa9c7c-97a2-44a5-bfc2-3ff3f9810812" id="sec.170D-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the Minister is satisfied each proposed holder of the amalgamated lease— </txt><list number.type="manual" unnumbered.indent="0"><li guid="_6e6b8ac7-779a-495b-8f68-43b9c9fe7bb4" id="sec.170D-ssec.2-para1.b-para2.ii-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">satisfies the capability criteria; and</txt></block></li><li guid="_c1fc34ec-4796-41da-86d9-6acd418137e4" id="sec.170D-ssec.2-para1.b-para2.ii-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">continues to satisfy any special criteria that applied for deciding the application for each of the individual leases; and</txt></block></li><li guid="_a41feced-0776-400a-ab4f-8246a44ec36d" id="sec.170D-ssec.2-para1.b-para2.ii-para3.C" provision.type="other"><no>(C)</no><block><txt break.before="0">has substantially complied with the conditions of the individual leases.</txt></block></li></list></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_34a3ce32-0e31-40f5-b120-5834d66907ef" id="sec.170D-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The matters that may be considered in granting the amalgamated lease include the development plans for the individual leases, the proposed development plan for the amalgamated lease and the capability criteria.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_26d30391-373c-4a91-b3ab-e15630277d32" id="sec.170D-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The Minister may, as a condition of granting the amalgamated lease, require the applicant to give security or additional security for the amalgamated lease, under section 488, within a stated reasonable period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b6e45fad-5ebc-4cfc-b890-988bd0a31dcb" id="sec.170D-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the applicant does not comply with a requirement under subsection (4), the application may be refused.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0c3142ab-9e16-4146-ae76-d825fa4dabad" id="sec.170E" provision.type="other" spent.amends="0"><no>170E </no><heading guid="_ac2254d6-e3de-47bb-8a11-22b73c5f476d" id="sec.170E-he">Provisions of amalgamated lease</heading><subclause affected.by.uncommenced="0" guid="_ac441459-cf89-4f17-8867-aade14870ac1" id="sec.170E-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Subject to this section, section 123 applies for the provisions of an amalgamated lease as if it were a petroleum lease granted under division 2.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d92a68bd-d8a4-44f9-acd9-0debc634ea8c" id="sec.170E-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the production commencement day for the amalgamated lease must not be later than the earliest production commencement day of the individual leases. </txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_92b946d7-cb43-4e69-83f3-811151a84728" id="sec.170F" provision.type="other" spent.amends="0"><no>170F </no><heading guid="_023d43d1-1ae6-4026-876d-9103d2e43a19" id="sec.170F-he">Steps after deciding application</heading><subclause affected.by.uncommenced="0" guid="_7b6dc53c-895f-4f5e-87e0-6ce9f13c136d" id="sec.170F-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the Minister decides to grant the amalgamated lease, the Minister must give the applicant and any other holder of the amalgamated lease notice of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0fc2a9e1-318c-42b8-9e23-0dda607c8b58" id="sec.170F-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the provisions under section 123 of the lease; and</txt></block></li><li guid="_2cb12cb2-ebaa-43d6-ba7e-0b42e5b18ed7" id="sec.170F-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the development plan approved for the lease.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ce16daa4-8579-462c-8fc6-342b8b8e50ae" id="sec.170F-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the Minister decides to refuse to grant the amalgamated lease, the Minister must give the applicant an information notice for the decision.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_f21b2cea-3c44-4eb9-9d6e-44d180eaa233" id="ch.2-pt.2-div.7-sdiv.2"><no>Subdivision 2</no><heading guid="_9bc7a8d9-e92d-4672-ae9a-4c67c7e9ba45" id="ch.2-pt.2-div.7-sdiv.2-he">Dividing petroleum leases</heading><clause affected.by.uncommenced="0" guid="_92514d73-728f-461e-ac8f-1b34a9f2beb1" id="sec.171" provision.type="other" spent.amends="0"><no>171</no><heading guid="_632a4414-354c-448b-809c-918b1f51c744" id="sec.171-he">Applying to divide</heading><subclause affected.by.uncommenced="0" guid="_f4af286f-3a5b-4a46-b637-3753640a8263" id="sec.171-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The holder of a petroleum lease (the <defterm guid="_188e6200-4f9d-4f4e-95de-42b26357ea16" id="sec.171-def.originallease" type="definition">original lease</defterm>) may apply to divide it into 2 or more petroleum leases (the <defterm guid="_d8114ac3-e526-4c6f-b5d9-5bd141926731" id="sec.171-def.newleases" type="definition">new leases</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a23f2397-d6f9-48b5-86b4-5919dec5ad69" id="sec.171-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the holder may apply for a new lease to be granted to another person only if the other person—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cd47f926-1766-467f-9acb-05989b27bbf0" id="sec.171-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">agrees to the proposed grant; and</txt></block></li><li guid="_b318d212-a9ca-497c-afe1-cc77d50ad64e" id="sec.171-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is an eligible person.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6daae06e-b2f2-4402-9e0e-901d4e38d000" id="sec.171-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Despite <intref check="valid" refid="sec.171-ssec.1" target.guid="_f4af286f-3a5b-4a46-b637-3753640a8263">subsections (1)</intref> and <intref check="valid" refid="sec.171-ssec.2" target.guid="_a23f2397-d6f9-48b5-86b4-5919dec5ad69">(2)</intref>, the holder can not make the application if any of the following is outstanding—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5f529f29-a35b-44bb-b494-3e7d4afca2a1" id="sec.171-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">annual rent for the original lease;</txt></block></li><li guid="_6e6a97dd-793e-43c7-8a99-148eb0a5edf4" id="sec.171-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a civil penalty under <intref check="valid" refid="sec.156" target.guid="_303a3992-6f4c-4625-83aa-a9c8be8a6db2">section 156</intref> for nonpayment of annual rent;</txt></block></li><li guid="_61852fff-8f16-4975-b27f-67139d750999" id="sec.171-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">interest payable under <intref check="valid" refid="sec.588" target.guid="_a4bc919c-7264-46d2-bbaa-0d47579c4e14">section 588</intref> on annual rent or a civil penalty;</txt></block></li><li guid="_a08f6247-5538-4882-8e9a-c460721e46ba" id="sec.171-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a royalty-related amount payable by the holder;</txt></block></li><li guid="_0a9243b0-af27-406f-966d-b876c4444333" id="sec.171-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">security for the original lease, as required under <intref check="valid" refid="sec.488" target.guid="_13f8de44-15a4-4a47-a9af-6464bc374dda">section 488</intref>.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_48cf92cd-e181-42e1-8861-668143ac9c37" id="sec.172" provision.type="other" spent.amends="0"><no>172</no><heading guid="_1c181f31-f474-467f-8406-c04bd953adb7" id="sec.172-he">Requirements for making application</heading><block><txt break.before="1">The application must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_344792f6-88ef-4fab-997f-4515ceab6cb6" id="sec.172-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li guid="_7affd2db-da85-42bf-8817-ce8dd28aaeeb" id="sec.172-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state whether or not the development plan for the original lease has been complied with; and</txt></block></li><li guid="_a3885735-a7c6-43c4-a2bd-09afb3f96acb" id="sec.172-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the development plan for the original lease has not been complied with—state details of, and the reasons for, each noncompliance; and</txt></block></li><li guid="_19a04163-79cc-480d-a5d5-58941c5930a5" id="sec.172-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">include a proposed later development plan for each proposed new lease; and</txt><note guid="_c2d856ba-6262-4412-aaba-471f26bf7c6d" id="sec.172-para1.d-note" type="example"><heading guid="_3c6d665b-62ec-46fe-b7ed-eab350295ea2" id="sec.172-para1.d-note-he">Note—</heading><block><txt break.before="1">For an additional requirement for the proposed development plans, see <intref check="valid" refid="sec.144" target.guid="_c9853219-842f-468b-a0dc-7052988ee370">section 144</intref>.</txt></block></note></block></li><li guid="_330ff545-1b10-42f9-b264-31efb8e6f651" id="sec.172-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">address the capability criteria for each proposed holder of the new leases; and</txt></block></li><li guid="_26ba7a44-5fc9-4b8e-b31d-9de767131b45" id="sec.172-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">state whether or not the holder has complied with <intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref>, <intref check="valid" refid="ch.5-pt.7" target.guid="_01d524f3-ca84-4e41-ab48-d8ec12875570">part 7</intref>, for reports required to be lodged in relation to the original lease; and</txt></block></li><li guid="_fccef9fb-5d6b-4933-8cf1-8d644d45b9ed" id="sec.172-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">be accompanied by the fee prescribed under a regulation.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_aa7ae749-2181-4888-9b55-785cb5fad18d" id="sec.173" provision.type="other" spent.amends="0"><no>173</no><heading guid="_1d75583a-174c-4afa-8e5f-a015837fd91d" id="sec.173-he">Deciding application</heading><subclause affected.by.uncommenced="0" guid="_207c543f-8a97-405b-a672-bf6da9e38c69" id="sec.173-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may make or refuse to make the division.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f42d1554-d8e5-4998-a0c1-ed1286a6c703" id="sec.173-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e2b6c06b-eca7-4c88-8ee0-5011db840aa1" id="sec.173-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before deciding to make the division, the Minister must decide whether to approve the proposed later development plans for the new leases; and</txt></block></li><li guid="_571e43c3-d4f5-469e-b9a3-0e3c40f76247" id="sec.173-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the division can not be made unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e477d3f9-8979-44a6-b549-09302a8355ed" id="sec.173-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the proposed plans have been approved; and</txt></block></li><li guid="_9bb8b6a5-e20d-4f21-94ab-473ddb1fcb26" id="sec.173-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the applicant has established 1 of the matters mentioned in <intref check="valid" refid="sec.121" target.guid="_7ba300a7-78fd-4831-8fe2-a3dc6ea79cf0">section 121</intref><intref check="valid" refid="sec.121-ssec.2" target.guid="_389d0935-b466-43dd-a2a8-7c97fc8edd04">(2)</intref> for each proposed lease; and</txt></block></li><li guid="_cb509ee3-66c4-44c0-9242-88cab10cf7f6" id="sec.173-ssec.2-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">each proposed holder of the new leases satisfies the capability criteria; and</txt></block></li><li guid="_f0dc1f48-6fbc-4d11-a550-d2d55b18ad41" id="sec.173-ssec.2-para1.b-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">the Minister is satisfied the applicant continues to satisfy any special criteria that applied for deciding the application for the original lease; and</txt><note guid="_c570e394-4539-44e3-82b5-1b8d87b03604-del" id="sec.173-ssec.2-para1.b-para2.iv-note-del" type="example"><heading change="delReplace" guid="_12b11a68-1cb3-4845-be24-6ea09a846099-del" id="sec.173-ssec.2-para1.b-para2.iv-note-he-del">Note—</heading><block><txt break.before="1"><del xml:space="preserve">See <intref check="valid" refid="sec.35" target.guid="_87b53d9f-6f6c-49a9-ad51-118aa252ae58">sections 35</intref><intref check="valid" refid="sec.35-ssec.2" target.guid="_120ae8b4-7377-489d-b475-e040e000f7e2">(2)</intref><intref check="valid" refid="sec.35-ssec.2-para1.e" target.guid="_d6918c74-54bf-4835-9756-6a2f38027506">(e)</intref><intref check="valid" refid="sec.35-ssec.2-para1.e-para2.iii" target.guid="_83d446d8-50bf-4b3c-b96b-81d1b73f0fad">(iii)</intref> (Call for tenders) and <intref check="valid" refid="sec.43" target.guid="_2c0b3e46-8914-4834-bfdb-7d2ff2248ba2">43</intref> (Criteria for decisions).</del></txt></block></note><note guid="_5bcab102-352d-4c66-a0d9-149f12e96883" id="sec.173-ssec.2-para1.b-para2.iv-note" type="example"><heading change="insReplace" guid="_4fa4ed93-e5da-472b-ac9e-a3ac9950af51" id="sec.173-ssec.2-para1.b-para2.iv-note-he">Note—</heading><block><txt break.before="1"><ins xml:space="preserve">See sections 35(2)(h)(iii) and 43.</ins></txt></block></note></block></li><li guid="_8a030b8d-d9e9-47cb-b451-53ff23734d7c" id="sec.173-ssec.2-para1.b-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">the Minister is satisfied the applicant has substantially complied with the original lease.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_79ef3873-7d6a-47c9-87bf-d206d4099515" id="sec.173-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The matters that may be considered in making the division include the development plan for the original lease, the proposed later development plans and the capability criteria.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9b8f715c-9c4a-430f-b695-06ca9c0ab15a" id="sec.173-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The Minister may, as a condition of making the division, require the applicant to, under <intref check="valid" refid="sec.488" target.guid="_13f8de44-15a4-4a47-a9af-6464bc374dda">section 488</intref>, give security or additional security for all or any of the new leases within a stated reasonable period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_58408090-6f3f-475a-83e8-c52176758b3c" id="sec.173-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the applicant does not comply with the requirement, the division may be refused.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b35dfa9a-0f69-458d-b9aa-2b0675c559d0" id="sec.174" provision.type="other" spent.amends="0"><no>174</no><heading guid="_9f0aaea3-0198-4ede-bc44-fe174df1b9e2" id="sec.174-he">Provisions of new leases</heading><subclause affected.by.uncommenced="0" guid="_2d802187-f7fd-4496-9aec-63586342fb25" id="sec.174-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Subject to this section, <intref check="valid" refid="sec.123" target.guid="_ef44ece4-3399-4e95-8180-52c9dbb8d1b6">section 123</intref> applies for the provisions of a new lease as if it were a petroleum lease granted under <intref check="valid" refid="ch.2-pt.2-div.2" target.guid="_3fb4383f-3f81-4aa6-b3a5-b4e62287dd47">division 2</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f7b6f317-8866-434a-8892-0a59fa1b8a34" id="sec.174-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the term of each new lease must not end later than the end of the term of the original lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8dd5dea1-a990-4217-8f53-f716f30ea42f" id="sec.174-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For any relinquishment condition for the new leases—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_62518fb6-5c37-424c-87ab-fd34caef8ab1" id="sec.174-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the new leases are taken to have originally taken effect when the original lease originally took effect; and</txt></block></li><li guid="_b8e0a98f-49ca-43ab-b35f-ad6fb5770352" id="sec.174-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">land within any sub-block that the original lease states is included in the area of the original lease is divided rateably between the new leases; and</txt></block></li><li guid="_6713e2ba-80be-470d-94b1-449758689e79" id="sec.174-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">for working out previous relinquishments that are counted for the relinquishment condition for each new lease, the relinquishments previously counted for the relinquishment condition for the original lease are divided rateably between the new leases.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d0d39ad5-4637-4060-8cef-b038965a69fe" id="sec.175" provision.type="other" spent.amends="0"><no>175</no><heading guid="_821084cc-7aff-4d2a-be05-33ff54a33e06" id="sec.175-he">Steps after deciding application</heading><subclause affected.by.uncommenced="0" guid="_1cf2e0d6-3dbb-4233-873b-7bbe1fe6fc61" id="sec.175-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">After the provisions of the new leases are decided, the applicant and anyone else who will be a holder of any new lease, must be given notice of the relevant provisions and development plans.</txt><note guid="_c3130573-ca0f-4b16-917c-a1fb8c750c6c" id="sec.175-ssec.1-note" type="example"><heading guid="_70b73e2b-0d26-463c-b0a5-e97c70c6c8a9" id="sec.175-ssec.1-note-he">Note—</heading><block><txt break.before="1">For noncompliance action started, or that could have been taken, against the original lease holder, see <intref check="valid" refid="sec.792" target.guid="_edda888c-32e2-4766-aa77-c71b8cc8d351">section 792</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_e67ceebe-d16b-4636-9a96-9b855f9993ae" id="sec.175-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On refusal to make the division, the applicant must be given notice of the refusal.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_f240efae-effa-4c4c-bd0d-a4fe4219422d" id="ch.2-pt.2-div.7-sdiv.3"><no>Subdivision 3</no><heading guid="_d77fefb9-8b93-4963-b1da-af77f5a36786" id="ch.2-pt.2-div.7-sdiv.3-he">Changing production commencement day</heading><clause affected.by.uncommenced="0" guid="_09555f61-640e-4761-b800-18d4c82e53c2" id="sec.175AA" provision.type="other" spent.amends="0"><no>175AA </no><heading guid="_f57be3b8-c7ff-4fb6-9c1f-a3a1255e8613" id="sec.175AA-he">When holder may apply to change production commencement day</heading><block><txt break.before="1">The holder of a petroleum lease may apply to change the production commencement day for the lease to a new day only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bc7f8c5b-02a2-481a-b823-a5791d1fc399" id="sec.175AA-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the holder has a relevant arrangement in place to supply petroleum produced from the area of the lease; and</txt></block></li><li guid="_98384440-6619-4a88-89cd-03b4c53a79fc" id="sec.175AA-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the application is made no later than 1 year, or a shorter period prescribed by regulation, before the day by which petroleum production under the lease is to start.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_f5a71a85-461a-44e4-8a4e-d4de89707c33" id="sec.175AB" provision.type="other" spent.amends="0"><no>175AB </no><heading guid="_72b06269-5d7d-4fbf-9ffc-b437a3d23ca2" id="sec.175AB-he">Requirements for making application</heading><subclause affected.by.uncommenced="0" guid="_10e226af-c640-4895-8443-4508be341430" id="sec.175AB-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An application to change a production commencement day to a new day must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_859f8f7f-1d94-41a3-95c9-833dd95ce869" id="sec.175AB-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be made to the Minister in the approved form; and</txt></block></li><li guid="_0e71260c-7878-4225-b5c0-e412b780ebcd" id="sec.175AB-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0987f170-74c5-4b3d-8a25-dc4bea772f34" id="sec.175AB-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the proposed new day; and</txt></block></li><li guid="_1cb73ab8-cf5b-4410-92f0-b48cf9e61186" id="sec.175AB-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the grounds for seeking the change; and</txt></block></li></list></block></li><li guid="_9692b754-6162-4f37-b42a-72fc6e1842c8" id="sec.175AB-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">be supported by information, documents or instruments detailing—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9081a495-5c15-4dc1-8f28-f9cf4fad169d" id="sec.175AB-ssec.1-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the petroleum production required under all relevant arrangements relating to the lease; and</txt></block></li><li guid="_6b211695-ae16-4007-82f4-5ab11e575b95" id="sec.175AB-ssec.1-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the reserves, resources and characteristics of natural underground reservoirs of all petroleum authorities required to supply petroleum under the relevant arrangements; and</txt></block></li></list></block></li><li guid="_1e54aae3-513f-452b-92fa-3989b0170deb" id="sec.175AB-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">be accompanied by the fee prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5a260cf6-6685-4f4c-86eb-cb69ea312fb8" id="sec.175AB-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The holder must also give the Minister information, documents or instruments detailing all relevant arrangements relating to the lease unless the holder—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4f951b66-157d-48f9-9dd2-dd9082f9c730" id="sec.175AB-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">has already given the Minister the information, documents or instruments in complying with <intref check="valid" refid="sec.121" target.guid="_7ba300a7-78fd-4831-8fe2-a3dc6ea79cf0">section 121</intref><intref check="valid" refid="sec.121-ssec.1" target.guid="_2bef5596-0ba8-4bb3-bdca-b2ac997bf3e2">(1)</intref><intref check="valid" refid="sec.121-ssec.1-para1.g" target.guid="_eb3333c0-9e2f-4968-ab79-ec44b6f400b6">(g)</intref>; and</txt></block></li><li guid="_a3ebdfe9-9d3a-4189-9a27-e03f6ffc42c5" id="sec.175AB-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">lodges a written declaration that there has been no change in the relevant arrangements.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_44c937c3-e072-4c35-a688-7ff0d3cfa2d2" id="sec.175AB-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the holder has already given the Minister the information, documents or instruments in complying with <intref check="valid" refid="sec.121" target.guid="_7ba300a7-78fd-4831-8fe2-a3dc6ea79cf0">section 121</intref><intref check="valid" refid="sec.121-ssec.1" target.guid="_2bef5596-0ba8-4bb3-bdca-b2ac997bf3e2">(1)</intref><intref check="valid" refid="sec.121-ssec.1-para1.g" target.guid="_eb3333c0-9e2f-4968-ab79-ec44b6f400b6">(g)</intref> but a relevant arrangement has been changed, the holder must give the Minister the details of the changed arrangement that the Minister reasonably requires to decide whether the lease is an arms-length commercial transaction.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_5586affa-d80c-49ef-8251-aab54675e72c" id="sec.175AC" provision.type="other" spent.amends="0"><no>175AC </no><heading guid="_df70bae3-acb5-4919-b21d-4e1159543738" id="sec.175AC-he">Deciding application</heading><subclause affected.by.uncommenced="0" guid="_df603b22-478b-4ef9-b0ba-86eef6259da7" id="sec.175AC-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">After receiving an application to change a production commencement day to a new day, the Minister must decide whether or not to make the change.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_952e96c2-ea5d-4fc8-96dc-35f68acb1eb5" id="sec.175AC-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister may, if the holder of the lease agrees in writing, change the production commencement day for the lease to another day.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_cf49f1bd-857d-41e5-b738-36c81a916d5d" id="sec.175AC-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In deciding the application, the Minister must consider—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_db2fecb0-a84b-47d7-ac62-d0dfa79977e8" id="sec.175AC-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">whether the holder has substantially complied with the lease; and</txt></block></li><li guid="_ef113184-b1f1-4856-9906-4ad0262bb543" id="sec.175AC-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether petroleum production under the lease will be optimised in the best interests of the State; and</txt></block></li><li guid="_92f4ace9-bf32-42a0-a329-8f4a3bb2e3b8" id="sec.175AC-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the public interest.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a8d0843b-2b54-4d4e-97f4-b05a2604412b" id="sec.175AC-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The Minister may refuse the application if the Minister reasonably believes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b99cb045-2937-403a-a5b4-e636c09161bd" id="sec.175AC-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a relevant arrangement relating to the lease is not an arms-length commercial transaction; or</txt></block></li><li guid="_0833b224-769d-42dc-90e3-a351f5182656" id="sec.175AC-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">supply under the arrangement is unlikely to be carried out.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f8f6c46a-24c4-40c1-8084-139a7c8422c8" id="sec.175AC-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the Minister decides to change the production commencement day to a new day, the Minister must amend the lease to give effect to the change.</txt><note guid="_c25b70f6-26ba-48c4-81d3-1f57f99182bc" id="sec.175AC-ssec.5-note" type="example"><heading guid="_ebb22e20-65d0-4361-9cf8-a46020e7fc12" id="sec.175AC-ssec.5-note-he">Note—</heading><block><txt break.before="1">A change in the production commencement day may require a later development plan for the lease to be lodged—see <intref check="valid" refid="sec.159" target.guid="_684a7ca4-fe5f-47c8-a929-0382f9cc1e93">section 159</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_a4eae8e6-92af-4dc9-bc85-ebbaea3e244e" id="sec.175AC-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The Minister may not decide to change the production commencement day to a day that is earlier than the day the decision is made.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_83c984e4-3ba9-435a-a4de-9d656ca9a36f" id="sec.175AC-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">The holder of the petroleum lease is taken not to be in breach of the holder’s obligation under <intref check="valid" refid="sec.154" target.guid="_480bb62b-8b18-47ac-9d79-897b1c68b4b0">section 154</intref><intref check="valid" refid="sec.154-ssec.1" target.guid="_7cd03659-77bc-4301-9f03-3a9113ecabfa">(1)</intref> before the first of the following happens—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c6495839-0d41-4f09-850f-9fb6bc877470" id="sec.175AC-ssec.7-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the Minister decides whether to change the production commencement day to a new day, and the decision is not appealed or, if there is an appeal, the appeal is finalised;</txt></block></li><li guid="_5573809e-e71f-409a-8b9c-5ab0cad816c5" id="sec.175AC-ssec.7-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Minister changes the production commencement day with the agreement of the lessee under <intref check="valid" refid="sec.175AC-ssec.2" target.guid="_952e96c2-ea5d-4fc8-96dc-35f68acb1eb5">subsection (2)</intref>.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_fcde2d89-ee0e-465d-b242-154a192bb28a" id="sec.175AD" provision.type="other" spent.amends="0"><no>175AD </no><heading guid="_765c0016-240d-4d96-84da-ba21fc294f06" id="sec.175AD-he">Information notice about decision</heading><block><txt break.before="1">If the Minister decides not to change the production commencement day for a lease to a new day, the Minister must give the applicant an information notice about the decision.</txt></block></clause></subdivision></division></part><part affected.by.uncommenced="0" guid="_09c738ec-93af-4250-9a37-cbe4a1cd1167" id="ch.2-pt.2A"><no>Part 2A</no><heading guid="_69453690-fa78-4a8a-9591-4f1b84be206d" id="ch.2-pt.2A-he">Prospective Gas Production Land Reserve</heading><clause affected.by.uncommenced="0" guid="_a4b50ee9-4830-4d7a-9823-839d183f9fbd" id="sec.175A" provision.type="other" spent.amends="0"><no>175A</no><heading guid="_1e980231-4dbf-43dc-8a09-9fd67e963bc4" id="sec.175A-he">Meaning of <defterm guid="_bf42b159-1d9b-4386-9fa7-df58b85fc313" type="mention">Australian market supply condition</defterm></heading><block><txt break.before="1">An <defterm guid="_d1b2c8a5-f671-49fe-8b3a-39fecf42b9d0" id="def.Australianmarketsupplycondition" type="definition">Australian market supply condition</defterm>, for land, is a condition under which—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7cacc567-2323-4fa0-99f9-77a7e44ff140" id="sec.175A-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">gas produced from the land must not be supplied other than to the Australian market; and</txt></block></li><li guid="_49f57af0-10b4-4912-a193-fa02fccdd8c6" id="sec.175A-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any contract or other arrangement for the supply of the gas must include a condition that the gas must not be further supplied other than to the Australian market.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_420af332-66d7-4aa1-9c75-fceb2a403d24" id="sec.175B" provision.type="other" spent.amends="0"><no>175B</no><heading guid="_bef2fb05-61a5-42a2-82fb-4de8ae2f72da" id="sec.175B-he">Meaning of <defterm guid="_c93de18a-5047-4a1b-aa25-88c645b28f08" type="mention">Australian market</defterm></heading><block><txt break.before="1"><defterm guid="_cc25da78-5f8d-4449-b8f9-d603cfe6b4b2" id="def.Australianmarket" type="definition">Australian market</defterm>, in relation to the supply of gas, means an entity or entities that will—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c21c323e-d0d0-4b6a-b898-b6da402fab53" id="sec.175B-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">consume the gas within Australia; or</txt></block></li><li guid="_27b83e9c-b6f3-4945-b734-f078ebcc4218" id="sec.175B-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">supply the gas to an entity or entities that will consume the gas within Australia.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_71193651-0bf7-41be-b25c-f18f55c20ec4" id="sec.175C" provision.type="other" spent.amends="0"><no>175C</no><heading guid="_d8f43f47-eb0f-4a14-96a4-d16feb43c23f" id="sec.175C-he">Supply of gas from PGPLR land</heading><subclause affected.by.uncommenced="0" guid="_9fcfc1c8-26f3-4046-94d2-639f52b30f57" id="sec.175C-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The holder of a petroleum tenure for PGPLR land—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8d5b81bf-2498-4dba-bb1a-1dd54f73b41c" id="sec.175C-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must not supply gas produced from the land other than to the Australian market; and</txt></block></li><li guid="_a72b3130-6329-4253-962f-f3d4cfbba9ec" id="sec.175C-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">must include in any contract or other arrangement for the supply of the gas a condition that the gas must not be further supplied other than to the Australian market.</txt></block></li></list></block><penalty guid="_b9ed3d66-c41b-4718-abcd-27a45c1b2fa7" id="sec.175C-ssec.1-pen"><block><txt break.before="1">Maximum penalty—1,000 penalty units.</txt></block></penalty><note guid="_84af7cd8-6bf0-4385-90bd-7087e698ed17" id="sec.175C-ssec.1-note" type="example"><heading guid="_3ee390f8-a4b8-4955-a9a4-3f222e5c8cae" id="sec.175C-ssec.1-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_552d7fc3-2fac-4070-8131-2e34c9adf499" id="sec.175C-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if the application of the Australian market supply condition to the land has been suspended under <intref check="valid" refid="sec.175G" target.guid="_cfd2bb54-4f89-4364-b428-83ffa1287808">section 175G</intref><intref check="valid" refid="sec.175G-ssec.1" target.guid="_f3acf64a-c14a-437e-ba83-c12e4e04c6a9">(1)</intref> for a stated period, <intref check="valid" refid="sec.175C-ssec.1" target.guid="_9fcfc1c8-26f3-4046-94d2-639f52b30f57">subsection (1)</intref> does not apply to the holder for the stated period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1eae2717-e14d-407b-9a66-dd25ee855253" id="sec.175C-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">An entity to which gas produced from PGPLR land is supplied—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b16b5c74-4f88-45ae-87b6-fef4f791b912" id="sec.175C-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must not further supply the gas other than to the Australian market; and</txt></block></li><li guid="_6e258d50-d618-45c6-b4b2-a40357b258a4" id="sec.175C-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">must include in any contract or other arrangement for the supply of the gas a condition that the gas must not be further supplied other than to the Australian market.</txt></block></li></list></block><penalty guid="_e6a6174f-66bc-46c8-9104-cd86e0e45277" id="sec.175C-ssec.3-pen"><block><txt break.before="1">Maximum penalty—1,000 penalty units.</txt></block></penalty><note guid="_94d17a31-e147-474b-93c5-c26e7cc21d51" id="sec.175C-ssec.3-note" type="example"><heading guid="_22bda6f7-8fb3-4d2e-af91-7eb01af344da" id="sec.175C-ssec.3-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_1a7419a2-7c09-4926-b4b0-5d162b1801c3" id="sec.175C-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, if the entity holds an exemption under <intref check="valid" refid="sec.175G" target.guid="_cfd2bb54-4f89-4364-b428-83ffa1287808">section 175G</intref><intref check="valid" refid="sec.175G-ssec.2" target.guid="_57c9c04d-3427-4301-acb6-85e02c2bf8e4">(2)</intref> for a stated period in relation to the land, <intref check="valid" refid="sec.175C-ssec.3" target.guid="_1eae2717-e14d-407b-9a66-dd25ee855253">subsection (3)</intref> does not apply to the entity, for the stated period, in relation to gas produced from the land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_82514776-f659-448e-9365-2d4f5a845d34" id="sec.175C-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0"><intref check="valid" refid="sec.175C-ssec.3" target.guid="_1eae2717-e14d-407b-9a66-dd25ee855253">Subsection (3)</intref><intref check="valid" refid="sec.175C-ssec.3-para1.a" target.guid="_b16b5c74-4f88-45ae-87b6-fef4f791b912">(a)</intref> applies subject to <intref check="valid" refid="sec.175D" target.guid="_c7e37c70-7715-45eb-ae7f-394e29c1cc8d">section 175D</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c7e37c70-7715-45eb-ae7f-394e29c1cc8d" id="sec.175D" provision.type="other" spent.amends="0"><no>175D</no><heading guid="_827c8dfa-9d75-48b4-81cf-cf63af8dfd5a" id="sec.175D-he">Urgent exemption from application of <intref check="valid" refid="sec.175C" target.guid="_71193651-0bf7-41be-b25c-f18f55c20ec4">s 175C</intref><intref check="valid" refid="sec.175C-ssec.3" target.guid="_1eae2717-e14d-407b-9a66-dd25ee855253">(3)</intref><intref check="valid" refid="sec.175C-ssec.3-para1.a" target.guid="_b16b5c74-4f88-45ae-87b6-fef4f791b912">(a)</intref></heading><subclause affected.by.uncommenced="0" guid="_20bcaeb7-7c0e-4af2-8425-9f385927ce43" id="sec.175D-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0"><intref check="valid" refid="sec.175D-ssec.2" target.guid="_7b412d78-cba8-4028-82b7-b04e08048d47">Subsection (2)</intref> applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b1c8d80c-1f24-4d3b-be33-2c51cebe6fcb" id="sec.175D-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an entity is a consumer of gas; and</txt></block></li><li guid="_ffc6a076-7629-4dce-a049-7887839b94b5" id="sec.175D-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">because of technical or operational problems, the entity is unable to consume gas produced from PGPLR land and supplied to the entity; and</txt></block></li><li guid="_ed0a86d6-92a1-4653-8f2d-652d87c6cf24" id="sec.175D-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the entity has taken all reasonable steps to supply the gas to the Australian market but the entity considers it is not commercially viable to do so; and</txt></block></li><li guid="_ed685f23-a605-4a6f-96eb-6cab8482b46f" id="sec.175D-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the entity supplies the gas other than to the Australian market; and</txt></block></li><li guid="_88b52545-e466-43f6-8c6f-dc4084ec024a" id="sec.175D-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the entity gives notice of the supply of the gas, the reason for the supply and the date the technical or operational problem arose, to the chief executive within 5 days after starting to supply the gas.</txt><note guid="_bd6edba7-e394-4de1-8a12-1dfbcff241c4" id="sec.175D-ssec.1-para1.e-note" type="example"><heading guid="_e461e874-ec57-42f2-87b5-054f5569cb05" id="sec.175D-ssec.1-para1.e-note-he">Example of a technical or operational problem for <intref check="valid" refid="sec.175D-ssec.1-para1.b" target.guid="_ffc6a076-7629-4dce-a049-7887839b94b5">paragraph (b)</intref>—</heading><block><txt break.before="1">the failure of the entity’s plant or machinery</txt></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7b412d78-cba8-4028-82b7-b04e08048d47" id="sec.175D-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.175C" target.guid="_71193651-0bf7-41be-b25c-f18f55c20ec4">Section 175C</intref><intref check="valid" refid="sec.175C-ssec.3" target.guid="_1eae2717-e14d-407b-9a66-dd25ee855253">(3)</intref><intref check="valid" refid="sec.175C-ssec.3-para1.a" target.guid="_b16b5c74-4f88-45ae-87b6-fef4f791b912">(a)</intref> does not apply to the entity for 30 days after the technical or operational problem arises.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_32749e3f-fdb8-4eeb-b18c-71b9f193eb3a" id="sec.175E" provision.type="other" spent.amends="0"><no>175E</no><heading guid="_d42a80e0-a716-4895-9128-53882de87076" id="sec.175E-he">Suspension of application of, or exemption from, Australian market supply condition</heading><subclause affected.by.uncommenced="0" guid="_b6adc691-5e11-4a35-8c17-26ed6596c5ed" id="sec.175E-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The holder of a petroleum tenure for PGPLR land may apply to the Minister for a suspension, for a stated period, of the application of the Australian market supply condition to the land if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9fd4de8e-16be-4889-9a01-d1fe22517e90" id="sec.175E-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">market analysis indicates that, during the stated period, sufficient gas may be produced from existing and proposed petroleum tenures in the State to supply both the Australian market and export demand; or</txt></block></li><li guid="_24a8b820-eaec-4cb3-8a0d-e31e775db4cf" id="sec.175E-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder has taken all reasonable steps to supply the gas produced from the PGPLR land to the Australian market but it is not commercially viable to do so.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ba6fb184-a933-4687-8151-e63f5f86ab2a" id="sec.175E-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An entity to which gas produced from PGPLR land is supplied may apply to the chief executive for an exemption, for a stated period, from <intref check="valid" refid="sec.175C" target.guid="_71193651-0bf7-41be-b25c-f18f55c20ec4">section 175C</intref><intref check="valid" refid="sec.175C-ssec.3" target.guid="_1eae2717-e14d-407b-9a66-dd25ee855253">(3)</intref> in relation to the land if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_208c0446-a445-4134-b999-786eccbfb8ac" id="sec.175E-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">market analysis indicates that, during the stated period, sufficient gas may be produced from existing and proposed petroleum tenures in the State to supply both the Australian market and export demand; or</txt></block></li><li guid="_cd23c5bb-c3bb-4b45-83c5-5170b27af254" id="sec.175E-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the entity has taken all reasonable steps to supply the gas produced from the PGPLR land to the Australian market but it is not commercially viable to do so.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f7b94154-b8fb-4886-8da7-d8fee12a640c" id="sec.175F" provision.type="other" spent.amends="0"><no>175F</no><heading guid="_6a1512c0-1d29-4bf5-8b85-4bad03cb6559" id="sec.175F-he">Assessing commercial viability</heading><block><txt break.before="1">In assessing commercial viability of the supply of gas produced from PGPLR land for <intref check="valid" refid="sec.175E" target.guid="_32749e3f-fdb8-4eeb-b18c-71b9f193eb3a">section 175E</intref>, the Minister or the chief executive may have regard to the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c2284128-c94e-489f-9bfd-d6c2a49d010c" id="sec.175F-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">whether the rate of return on the investment of money required to produce gas from the land and supply it to the Australian market at least meets the rate of return considered acceptable by a reasonable petroleum producer or a lender to a petroleum producer;</txt></block></li><li guid="_694d1caf-985c-4b0c-a299-109778f6f410" id="sec.175F-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the market conditions at the time the application is made under <intref check="valid" refid="sec.175E" target.guid="_32749e3f-fdb8-4eeb-b18c-71b9f193eb3a">section 175E</intref>, including, for example, access to markets, the expected duration of a contract or other arrangement for the supply of the gas, the price likely to be paid for the gas and the certainty and timing of market opportunities;</txt></block></li><li guid="_a972ec4f-3a76-4ce6-a10b-a8041783da9c" id="sec.175F-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">whether, if commercial viability is dependent on the applicant reaching agreement with another entity or using the other entity’s facilities or technology, the applicant can complete the agreement or use the facilities or technology on terms the applicant considers provide a reasonable rate of return for the applicant.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_cfd2bb54-4f89-4364-b428-83ffa1287808" id="sec.175G" provision.type="other" spent.amends="0"><no>175G</no><heading guid="_50f85760-c387-40c4-8c1f-34f542d67b63" id="sec.175G-he">Deciding application</heading><subclause affected.by.uncommenced="0" guid="_f3acf64a-c14a-437e-ba83-c12e4e04c6a9" id="sec.175G-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may grant an application mentioned in <intref check="valid" refid="sec.175E" target.guid="_32749e3f-fdb8-4eeb-b18c-71b9f193eb3a">section 175E</intref><intref check="valid" refid="sec.175E-ssec.1" target.guid="_b6adc691-5e11-4a35-8c17-26ed6596c5ed">(1)</intref> only if the Minister is satisfied about a matter mentioned in <intref check="valid" refid="sec.175E" target.guid="_32749e3f-fdb8-4eeb-b18c-71b9f193eb3a">section 175E</intref><intref check="valid" refid="sec.175E-ssec.1" target.guid="_b6adc691-5e11-4a35-8c17-26ed6596c5ed">(1)</intref><intref check="valid" refid="sec.175E-ssec.1-para1.a" target.guid="_9fd4de8e-16be-4889-9a01-d1fe22517e90">(a)</intref> or <intref check="valid" refid="sec.175E-ssec.1-para1.b" target.guid="_24a8b820-eaec-4cb3-8a0d-e31e775db4cf">(b)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_57c9c04d-3427-4301-acb6-85e02c2bf8e4" id="sec.175G-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may grant an application mentioned in <intref check="valid" refid="sec.175E" target.guid="_32749e3f-fdb8-4eeb-b18c-71b9f193eb3a">section 175E</intref><intref check="valid" refid="sec.175E-ssec.2" target.guid="_ba6fb184-a933-4687-8151-e63f5f86ab2a">(2)</intref> only if the chief executive is satisfied about a matter mentioned in <intref check="valid" refid="sec.175E" target.guid="_32749e3f-fdb8-4eeb-b18c-71b9f193eb3a">section 175E</intref><intref check="valid" refid="sec.175E-ssec.2" target.guid="_ba6fb184-a933-4687-8151-e63f5f86ab2a">(2)</intref><intref check="valid" refid="sec.175E-ssec.2-para1.a" target.guid="_208c0446-a445-4134-b999-786eccbfb8ac">(a)</intref> or <intref check="valid" refid="sec.175E-ssec.2-para1.b" target.guid="_cd23c5bb-c3bb-4b45-83c5-5170b27af254">(b)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_27950ed1-97ca-4931-b655-0927f27db69a" id="sec.175G-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the Minister or chief executive refuses to grant an application, the applicant must be given an information notice for the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_ea671f09-a809-40f1-8b0a-43e5f2c393b8" id="sec.175H" provision.type="other" spent.amends="0"><no>175H</no><heading guid="_93268448-0886-41c5-8a75-0fa360ebea61" id="sec.175H-he">Requirement to keep and give records</heading><subclause affected.by.uncommenced="0" guid="_ed2e337c-75c1-48f4-b5b8-311cf684cdb0" id="sec.175H-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the following (each a <defterm guid="_26cc89f3-191e-48f5-9452-b41f3aba04e4" id="sec.175H-def.sellingentity" type="definition">selling entity</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a27b1da8-eb76-45a1-a3f6-49aa033af350" id="sec.175H-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the holder of a petroleum lease for PGPLR land who supplies gas produced from the land;</txt></block></li><li guid="_792f026b-d303-4e22-8fc2-ff27e6c00427" id="sec.175H-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">another entity that supplies gas produced from PGPLR land.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_19e90e77-032c-4666-99a8-0ea8baa1cd20" id="sec.175H-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A selling entity must, for the period and in the way prescribed under a regulation, keep the records prescribed under a regulation for each supply by the selling entity of gas produced from PGPLR land.</txt></block><penalty guid="_89b6fb6c-ec45-4e41-95b4-790ad92eeb78" id="sec.175H-ssec.2-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty><note guid="_be8ce9f1-bd3c-4bfa-993e-047b30bffa8a" id="sec.175H-ssec.2-note" type="example"><heading guid="_0374f811-4d08-40f1-94dc-3bfff1703747" id="sec.175H-ssec.2-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_7647d2d9-6b6d-4e57-bcca-43b83d306e91" id="sec.175H-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the chief executive gives a selling entity a notice asking for a copy of a record kept under <intref check="valid" refid="sec.175H-ssec.2" target.guid="_19e90e77-032c-4666-99a8-0ea8baa1cd20">subsection (2)</intref>, the selling entity must give a copy of the record to the chief executive within the reasonable period stated in the notice.</txt></block><penalty guid="_87aff74c-aa32-4707-81da-aa020064b74b" id="sec.175H-ssec.3-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty><note guid="_58e2882d-c60b-4e22-a4b5-3a9e6367479b" id="sec.175H-ssec.3-note" type="example"><heading guid="_0a59b922-bf9e-4117-95c2-5ba8fe7dd016" id="sec.175H-ssec.3-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause></clause><clause affected.by.uncommenced="0" guid="_6cf1701d-0c52-4ef9-affb-084a012a3d97" id="sec.175I" provision.type="other" spent.amends="0"><no>175I</no><heading guid="_70d32d3e-0567-43f2-b4d5-88766b822ea9" id="sec.175I-he">Order to enforce compliance with <intref check="valid" refid="sec.175C" target.guid="_71193651-0bf7-41be-b25c-f18f55c20ec4">s 175C</intref></heading><subclause affected.by.uncommenced="0" guid="_17cf6fa0-276f-4af0-af7c-a7faed539ef5" id="sec.175I-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, on the application of the chief executive, the District Court is satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0482a9e0-97f1-4ab0-877b-a4ceba0a6c45" id="sec.175I-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the holder of a petroleum tenure for PGPLR land is supplying gas produced from the land other than to the Australian market, contrary to <intref check="valid" refid="sec.175C" target.guid="_71193651-0bf7-41be-b25c-f18f55c20ec4">section 175C</intref><intref check="valid" refid="sec.175C-ssec.1" target.guid="_9fcfc1c8-26f3-4046-94d2-639f52b30f57">(1)</intref><intref check="valid" refid="sec.175C-ssec.1-para1.a" target.guid="_8d5b81bf-2498-4dba-bb1a-1dd54f73b41c">(a)</intref>; or</txt></block></li><li guid="_1d581b67-eb67-4a66-9001-91051202ffec" id="sec.175I-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an entity to which gas produced from PGPLR land was supplied is further supplying the gas other than to the Australian market, contrary to <intref check="valid" refid="sec.175C" target.guid="_71193651-0bf7-41be-b25c-f18f55c20ec4">section 175C</intref><intref check="valid" refid="sec.175C-ssec.3" target.guid="_1eae2717-e14d-407b-9a66-dd25ee855253">(3)</intref><intref check="valid" refid="sec.175C-ssec.3-para1.a" target.guid="_b16b5c74-4f88-45ae-87b6-fef4f791b912">(a)</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b6b06d0c-c0d5-4683-b1c2-84c35cc75f0a" id="sec.175I-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The court may make either or both of the following orders—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_85f171c9-d0fc-465c-957c-4ec843e25abf" id="sec.175I-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an order granting an injunction, on terms the court considers appropriate, restraining the holder or other entity from supplying the gas other than to the Australian market;</txt></block></li><li guid="_203451cb-b124-4fb5-b6fb-4851466ef9a8" id="sec.175I-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">another order the court considers appropriate.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_dd3a91a3-3082-4abd-aca2-f69eb5343c95" id="sec.175I-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The court may decide not to make an order under this section in relation to the holder if the court considers that <intref check="valid" refid="sec.790" target.guid="_0ae40873-0f6d-4440-a74c-a02fa5649d4f">section 790</intref><intref check="valid" refid="sec.790-ssec.1" target.guid="_e5b16464-3b1b-49f2-9d8e-3b9d7c76d4ad">(1)</intref><intref check="valid" refid="sec.790-ssec.1-para1.b" target.guid="_be540110-8922-4c58-9559-fa56156b036c">(b)</intref> or <intref check="valid" refid="sec.790-ssec.1-para1.c" target.guid="_c1fb6ad7-98c7-4cf5-9517-089ce412667a">(c)</intref> provides a more appropriate way of dealing with the issue.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_b5c93aa1-55ed-4acc-a2ef-cd08552d4178" id="ch.2-pt.3"><no>Part 3</no><heading guid="_e38d98e0-32ce-4494-b352-988a62e45401" id="ch.2-pt.3-he">Data acquisition authorities</heading><division affected.by.uncommenced="0" guid="_29a83045-572a-46c1-9612-eff651cf8be5" id="ch.2-pt.3-div.1"><no>Division 1</no><heading guid="_d8bdc0e3-a89f-4868-8001-d8bb75ac716f" id="ch.2-pt.3-div.1-he">Obtaining data acquisition authority</heading><clause affected.by.uncommenced="0" guid="_ea0eaf24-065e-4c96-bcc8-ce7ae7ea65af" id="sec.176" provision.type="other" spent.amends="0"><no>176</no><heading guid="_84517a1d-df12-4051-8080-ad21bc37257d" id="sec.176-he">Who may apply for data acquisition authority</heading><subclause affected.by.uncommenced="0" guid="_92dd81c0-4533-4419-b717-7ede0d0d2c3f" id="sec.176-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A petroleum tenure holder may apply for a data acquisition authority to allow the applicant to carry out the following activities (<defterm guid="_23114b9d-e5a3-45a6-84d5-69a596dd3f09" id="sec.176-def.dataacquisitionactivities" type="definition">data acquisition activities</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c33a7297-bdaf-4649-b32a-dc37a74084a6" id="sec.176-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">geophysical surveys on land (the <defterm guid="_90078649-6c80-4b5c-be43-8222d20ec975" id="sec.176-ssec.1-def.dataacquisitionland" type="definition">data acquisition land</defterm>) contiguous to land in the area of the tenure to enable the applicant to acquire data relevant to authorised activities under the tenure;</txt></block></li><li guid="_9b6651e2-3a3e-4acd-8ae0-336846c7d56c" id="sec.176-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the entering of the data acquisition land to carry out the geophysical surveys.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2b9fc700-b3ee-4cec-ad50-de69181f5bd0" id="sec.176-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the application can not be made or granted for land in the area of another petroleum tenure.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_fb1100bc-dee8-46d7-93d3-54af155e311e" id="sec.177" provision.type="other" spent.amends="0"><no>177</no><heading guid="_48baf7f3-0173-4737-b9c3-47d802621ef5" id="sec.177-he">Requirements for making application</heading><block><txt break.before="1">The application must be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4d3178e1-98d8-4e84-bcf8-a46bb3bac6ee" id="sec.177-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in the approved form; and</txt></block></li><li guid="_8c98510a-356b-4c60-b2c5-90b104e342c8" id="sec.177-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">accompanied by the fee prescribed under a regulation.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_f6f66d5f-9502-4507-abd7-dd1cc7718650" id="sec.178" provision.type="other" spent.amends="0"><no>178</no><heading guid="_dcbbb290-8774-42c1-998f-7156ffb4fdea" id="sec.178-he">Deciding application for data acquisition authority</heading><subclause affected.by.uncommenced="0" guid="_946b1906-8ffc-446d-ae67-6123680f1e2c" id="sec.178-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may grant or refuse the data acquisition authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_cc0be104-8362-44f3-a048-3412d6870fcf" id="sec.178-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the data acquisition authority can not be granted unless a relevant environmental authority for the data acquisition authority has been issued.</txt><note guid="_98f7b266-33eb-40b0-b3ce-f5c8353740fa" id="sec.178-ssec.2-note" type="example"><heading guid="_75b573dc-85f7-41ca-9fe6-f105c066e78a" id="sec.178-ssec.2-note-he">Note—</heading><block><txt break.before="1">If the application relates to acquired land, see also <intref check="valid" refid="sec.30AC" target.guid="_9f663574-cdda-4e64-9f8f-6c6102041022">section 30AC</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_a29f2146-dbf6-437a-aa98-0ffa8d55a30f" id="sec.178-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The authority must state its term and the area subject to the authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c19681fd-8a50-458c-a45e-5c632becf54a" id="sec.178-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The term must end no later than 2 years after the authority takes effect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_cc1bd762-44a6-45e4-b078-c5e52f35d31d" id="sec.178-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The authority may also state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a2017fc8-86ea-4183-bfa2-555258efb049" id="sec.178-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">conditions or other provisions of the authority, other than conditions or provisions that are—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_550e0b4d-476b-41ce-a793-9151878fd9f7" id="sec.178-ssec.5-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">inconsistent with <intref check="valid" refid="sec.180" target.guid="_d1a03ab7-881a-4f03-8a60-1e57895991fd">section 180</intref>, <intref check="valid" refid="sec.181" target.guid="_a675db94-8efd-49c4-a0a5-c63c54c8b14b">181</intref> or <intref check="valid" refid="sec.184A" target.guid="_931fe35b-dec5-4c3b-993f-ffd1c771e7af">184A</intref> or any other mandatory condition for data acquisition authorities; or</txt><note guid="_45485704-8b2f-428f-b044-cf1142ca2f2f" id="sec.178-ssec.5-para1.a-para2.i-note" type="example"><heading guid="_765540d2-b9be-42a5-a08e-cfc35fcdb1e5" id="sec.178-ssec.5-para1.a-para2.i-note-he">Note—</heading><block><txt break.before="1"><intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">Chapter 5</intref> also imposes mandatory conditions on data acquisition authorities. In particular, see <intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref>, <intref check="valid" refid="ch.5-pt.8" target.guid="_6fd5c183-bb2d-498f-bceb-5e0aff62d198">part 8</intref>.</txt></block></note></block></li><li guid="_85a9b623-d47d-4b8b-8206-d620ba545ea9" id="sec.178-ssec.5-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">inconsistent with a condition of the petroleum tenure to which the authority relates; or</txt></block></li><li guid="_5212064b-0466-462b-bec5-f36a5d46b68c" id="sec.178-ssec.5-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the same as, or substantially the same as, or inconsistent with, any relevant environmental condition for the authority; and</txt></block></li></list></block></li><li guid="_72158647-ff16-4641-9b7a-23a7fa24892d" id="sec.178-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the day it takes effect.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_64ff2e1b-8630-459e-ac17-29375db621f0" id="sec.178-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">However, the provisions of the authority may exclude or restrict the carrying out of data acquisition activities.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7210163f-f9db-469b-a6fd-8f732ebfd7d1" id="sec.178-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">The Minister may, as a condition of deciding to grant the authority, require the applicant to do all or any of the following within a stated reasonable period—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_47992678-4bb6-4a7e-8fbf-d320ac9e7154" id="sec.178-ssec.7-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">pay the annual rent for the authority;</txt></block></li><li guid="_e3ec4f03-b9f9-4f27-aa35-b581ce3127f9" id="sec.178-ssec.7-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give, under <intref check="valid" refid="sec.488" target.guid="_13f8de44-15a4-4a47-a9af-6464bc374dda">section 488</intref>, security for the authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f4618c35-1f10-48a1-9f6f-7117b0f0df20" id="sec.178-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">If the applicant does not comply with the requirement, the application may be refused.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_656d88f3-b5d3-49ca-8415-db6224ebd596" id="sec.179" provision.type="other" spent.amends="0"><no>179</no><heading guid="_9beccfa7-309a-49a1-9a79-05fc8ee195bc" id="sec.179-he">Notice of refusal</heading><block><txt break.before="1">On refusal of the application, the applicant must be given notice of the decision to refuse.</txt><note guid="_180d8244-d34a-4398-8ee7-1fe3f7f58cc3" id="sec.179-note" type="example"><heading guid="_146fdaf7-fb2e-4c67-9ab6-b79806c4eab6" id="sec.179-note-he">Note—</heading><block><txt break.before="1">See also the <legref check="valid" jurisd="QLD" target.doc.id="act-1991-100" target.version.series="a8431166-6960-477c-bb90-f63ad3f3c477" type="act"><name emphasis="yes">Judicial Review Act 1991</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.32" target.doc.id="act-1991-100" target.guid="_5843facd-f562-41ab-817d-fe79e7323b25" target.version.series="a8431166-6960-477c-bb90-f63ad3f3c477" type="act">section 32</legref> (Request for statement of reasons).</txt></block></note></block></clause></division><division affected.by.uncommenced="0" guid="_994d4885-9913-44b1-bb9c-6dbb2acd82e2" id="ch.2-pt.3-div.2"><no>Division 2</no><heading guid="_eeefe33f-cf27-4507-80d0-b10985e03ec0" id="ch.2-pt.3-div.2-he">Provisions for data acquisition authorities</heading><note guid="_edf12da0-ca83-4fbe-847d-b88ad2264b10" id="ch.2-pt.3-div.2-note" type="example"><heading guid="_6543bdc0-28d7-46b6-a9c8-5384bfa412f9" id="ch.2-pt.3-div.2-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref> (Common petroleum authority provisions).</txt></block></note><clause affected.by.uncommenced="0" guid="_d1a03ab7-881a-4f03-8a60-1e57895991fd" id="sec.180" provision.type="other" spent.amends="0"><no>180</no><heading guid="_21a9001f-c6d5-460e-ac43-d918653b91b5" id="sec.180-he">Key authorised activities</heading><subclause affected.by.uncommenced="0" guid="_6bea542c-ed79-49cb-a9a5-63367e6abde9" id="sec.180-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A data acquisition authority authorises its holder to carry out data acquisition activities in the area of the authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d03fc50e-b7cc-4bfc-ae3c-0391d5f953a8" id="sec.180-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The authorised activities may be carried out despite the rights of an owner or occupier of land on which they are exercised.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6e929eab-5a12-4b6f-bef7-d14dcf0b9e83" id="sec.180-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the carrying out of the data acquisition activities is subject to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d33d7731-c894-4178-a913-41cf8050856c" id="sec.180-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0"><intref check="valid" refid="sec.6" target.guid="_6c6a5ac8-799d-44d8-9fef-34a0d04ecce2">section 6</intref>; and</txt></block></li><li guid="_89c7a39d-18ba-4266-b4f9-5df196188456" id="sec.180-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0"><intref check="valid" refid="ch.3" target.guid="_7d989cb7-da2a-4737-842c-bd1944dbb54e">chapter 3</intref>, <intref check="valid" refid="ch.3-pt.4" target.guid="_524d4f73-dd39-49b3-b4c7-37b171f90dd6">part 4</intref>, <intref check="valid" refid="ch.3-pt.4-div.2" target.guid="_eda1a8d6-2c2a-455e-ac73-462969bb7c7b">division 2</intref>; and</txt></block></li><li guid="_764acd4b-7d1e-4339-93ed-ad62d9841821" id="sec.180-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0"><intref check="valid" refid="ch.3A" target.guid="_4864cab3-5ae5-49c9-aeb6-cdfaa85590af">chapter 3A</intref>, <intref check="valid" refid="ch.3A-pt.5" target.guid="_fa8a3d9c-8f2e-42e4-9995-76304c3d08e0">part 5</intref>; and</txt></block></li><li guid="_37b19a81-d3eb-4b1d-9bd9-dbcfe49dc5c0" id="sec.180-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0"><intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref>; and</txt></block></li><li guid="_32539dc9-dd4e-4d05-9be5-7ceb6bbf807c" id="sec.180-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the mandatory and other conditions of the authority; and</txt></block></li><li guid="_aa650df8-3868-427d-82c4-4d875e0ed0fe" id="sec.180-ssec.3-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">any exclusion or restriction provided for in the authority on the carrying out of the activities.</txt></block></li></list><note guid="_b5311a7c-1fba-46c5-95d6-78c3ffb00aaa" id="sec.180-ssec.3-note" type="example"><heading guid="_58db6eba-9163-4763-86b9-736b9d0443c8" id="sec.180-ssec.3-note-he">Note—</heading><block><txt break.before="1">Also, the carrying out of particular activities on particular land in a data acquisition authority’s area may not be authorised following the taking of the land under a resumption law. See <intref check="valid" refid="sec.30AB" target.guid="_4abe0a1b-ba8f-40b0-b76e-1e1864fb56ff">section 30AB</intref>.</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a675db94-8efd-49c4-a0a5-c63c54c8b14b" id="sec.181" provision.type="other" spent.amends="0"><no>181</no><heading guid="_287bf98f-b3d1-4fd2-97ff-1ef4f97ceea4" id="sec.181-he">Additional condition of relevant petroleum tenure</heading><block><txt break.before="1">If a condition is imposed on a data acquisition authority (the <defterm guid="_5640ad17-c858-45ec-abb3-5e32fd82836a" id="def.authoritycondition" type="definition">authority condition</defterm>), it is a condition of the petroleum tenure to which the authority relates that the tenure holder must comply with the authority condition.</txt><note guid="_6e0723e6-cf44-4f11-92ef-5127b774ef2d" id="sec.181-note" type="example"><heading guid="_ea739cbd-51f2-4b45-9242-eee9fe099baa" id="sec.181-note-he">Note—</heading><block><txt break.before="1"><intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">Chapter 5</intref> also imposes mandatory conditions on data acquisition authorities. In particular, see <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.4" target.guid="_b576db0f-1676-41bb-9d2a-0c120f59c456">part 4</intref>, <intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref>, <intref check="valid" refid="ch.5-pt.8" target.guid="_6fd5c183-bb2d-498f-bceb-5e0aff62d198">part 8</intref> and the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-2014-047" target.guid="_78e7ee55-dcff-4087-b0b9-13497e839af3" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">chapter 3</legref>, <legref check="valid" jurisd="QLD" refid="ch.3-pt.2" target.doc.id="act-2014-047" target.guid="_adcc85c6-c389-49c8-b998-858dca31ac1f" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">part 2</legref>.</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_f73ecc82-0768-4239-88c0-8e6477bdfed6" id="sec.182" provision.type="other" spent.amends="0"><no>182</no><heading guid="_10660864-63d5-4b68-aca1-bc01aa5c50b2" id="sec.182-he">Authority holder is the relevant petroleum tenure holder from time to time</heading><block><txt break.before="1">The holder of a data acquisition authority is taken to be the person who, from time to time, holds the petroleum tenure to which the authority relates.</txt></block></clause><clause affected.by.uncommenced="0" guid="_09a0dd33-2284-45f7-acb1-8c205e716f40" id="sec.183" provision.type="other" spent.amends="0"><no>183</no><heading guid="_cde6df12-d085-4ee6-9ac2-dd460957cdc9" id="sec.183-he">Authority ends if relevant petroleum tenure ends</heading><block><txt break.before="1">A data acquisition authority ends if the petroleum tenure to which it relates ends.</txt></block></clause><clause affected.by.uncommenced="0" guid="_99057814-1743-413d-9ca0-df91fb45f2da" id="sec.184" provision.type="other" spent.amends="0"><no>184</no><heading guid="_97aab3cd-37af-45ca-88c3-b76e2c89fbcf" id="sec.184-he">Relationship with subsequent petroleum tenure</heading><subclause affected.by.uncommenced="0" guid="_82468e6a-e052-454c-ac5a-02aaf631e66e" id="sec.184-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a petroleum tenure is granted over land in the area of a data acquisition authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_10404cde-cbbf-4035-9a00-3b0d9e81ca8b" id="sec.184-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The grant does not limit the authority or its term.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_106f9f73-5d76-4646-aa73-75ff62b2fec2" id="sec.184-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, an authorised activity for the authority may be carried out on the land only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_13721584-40ee-473a-ad38-856b8dec9610" id="sec.184-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">carrying out the activity does not adversely affect the carrying out of an authorised activity for the tenure; or</txt></block></li><li guid="_064e4695-f10f-4b38-a493-3de1445377e1" id="sec.184-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the agreement conditions have been complied with.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7d2dc108-ed7c-4c8f-9d16-08c3616e7a18" id="sec.184-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_5f3ae16c-75a1-471f-bfca-3389d36da7e0" id="sec.184-ssec.4-def.agreementconditions_"><txt break.before="1"><defterm guid="_2e46d2cf-a43c-4b45-8a9a-5096f1344d6c" id="sec.184-ssec.4-def.agreementconditions" type="definition">agreement conditions</defterm> means that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c7758323-04c0-48fe-a15a-ad9c84e1a6b5" id="sec.184-ssec.4-def.agreementconditions-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the tenure holder has agreed in writing to the carrying out of the activity; and</txt></block></li><li guid="_bb544ca3-455c-48e0-8c2a-2079001cf5b8" id="sec.184-ssec.4-def.agreementconditions-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a copy of the agreement has been lodged; and</txt></block></li><li guid="_3b73900c-6b4f-4feb-a203-ac06e83a672f" id="sec.184-ssec.4-def.agreementconditions-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the agreement is still in force.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_931fe35b-dec5-4c3b-993f-ffd1c771e7af" id="sec.184A" provision.type="other" spent.amends="0"><no>184A</no><heading guid="_e851f0a3-8a4d-49a0-8bc9-c3101290484d" id="sec.184A-he">Annual rent</heading><subclause affected.by.uncommenced="0" guid="_bb8d1fe9-17b0-41ff-9d5e-a94ab39e7b17" id="sec.184A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A data acquisition authority holder must pay the State the rent, as prescribed under a regulation.</txt><note guid="_daa725ce-8d0f-49f0-8769-378c92491fb9" id="sec.184A-ssec.1-note" type="example"><heading guid="_cd9db139-87fa-423d-82e5-a6700486600d" id="sec.184A-ssec.1-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.588" target.guid="_a4bc919c-7264-46d2-bbaa-0d47579c4e14">section 588</intref> (Interest on amounts owing to the State other than for petroleum royalty).</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_6f3a7dcc-6093-42a4-abf4-652425565971" id="sec.184A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The rent must be paid in the way, and on or before the day, prescribed under a regulation.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_b576db0f-1676-41bb-9d2a-0c120f59c456" id="ch.2-pt.4"><no>Part 4</no><heading guid="_8c3cc657-e965-4624-8f84-6de3c8897d28" id="ch.2-pt.4-he">Water rights for petroleum tenures</heading><clause affected.by.uncommenced="0" guid="_5311db10-8c62-445d-82df-35eda5925626" id="sec.185" provision.type="other" spent.amends="0"><no>185</no><heading guid="_af6c6384-992f-46c4-a8bf-cf1bca73770b" id="sec.185-he">Underground water rights—general</heading><subclause affected.by.uncommenced="0" guid="_618e6e9b-5cae-47ac-8fd2-52bc3ce9a280" id="sec.185-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The holder of a petroleum tenure may take or interfere with underground water in the area of the tenure if the taking or interference happens during the course of, or results from, the carrying out of another authorised activity for the tenure.</txt><note guid="_e22ae855-32a7-4d12-9284-230f1a14f5f0" id="sec.185-ssec.1-note" type="example"><heading guid="_89ca3f77-15bd-45b8-aa1f-f63997a8acf5" id="sec.185-ssec.1-note-he">Examples—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_10aaf460-3d2d-4b8b-bbf6-cb7f4f829ba8" id="sec.185-ssec.1-note-para1" provision.type="other"><no>•</no><block><txt break.before="0">underground water necessarily or unavoidably taken during the drilling of a petroleum well or water observation bore</txt></block></li><li guid="_f4875b00-0113-4a4e-9f85-3a8e310d1860" id="sec.185-ssec.1-note-para1-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">underground water necessarily or unavoidably taken during testing for petroleum production or petroleum production authorised under <intref check="valid" refid="sec.32" target.guid="_17d2869d-ceaf-4370-9aa7-b69853cdb6a8">section 32</intref> or <intref check="valid" refid="sec.109" target.guid="_06f97274-f5a7-4edf-b62f-55b51be78125">109</intref></txt></block></li></list></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_228186ac-2a49-4adf-9fe7-aea5ea8fb237" id="sec.185-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The rights under <intref check="valid" refid="sec.185-ssec.1" target.guid="_618e6e9b-5cae-47ac-8fd2-52bc3ce9a280">subsection (1)</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8c9992d6-a5ff-4a15-9d7c-c53e65128c0d" id="sec.185-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">are the <defterm guid="_eeb43abf-c65c-4c1f-acb7-24343efdffcb" id="sec.185-ssec.2-def.undergroundwaterrights" type="definition">underground water rights</defterm> for the petroleum tenure; and</txt></block></li><li guid="_0ec4d570-5262-45a3-bc98-fd1d71335203" id="sec.185-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">are subject to the tenure holder complying with the holder’s underground water obligations.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_4c9b50a0-0ce2-45fa-9ad6-5c6b273b74a5" id="sec.185-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">There is no limit to the volume of water that may be taken under the underground water rights.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3c74c8e3-5113-47d1-9b31-cbcbae30438c" id="sec.185-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Underground water taken or interfered with, under <intref check="valid" refid="sec.185-ssec.1" target.guid="_618e6e9b-5cae-47ac-8fd2-52bc3ce9a280">subsection (1)</intref>, from a petroleum well is <defterm guid="_91f403bc-7bcd-4f46-9580-a7e11c16ada1" id="sec.185-def.associatedwater" type="definition">associated water</defterm>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1b149aa6-b1fa-4326-b405-60176aff94e0" id="sec.185-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The tenure holder may use associated water for any purpose and within or outside the area of the tenure.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e2c37f9d-508a-4301-9c3e-2e59041f55d2" id="sec.185-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_75398d5a-ef69-49f0-89cc-6b5fa44ef312" id="sec.185-ssec.6-def.anotherauthorisedactivity_"><txt break.before="1"><defterm guid="_6ceccb16-e248-46ff-9de8-2c073ce0d0b4" id="sec.185-ssec.6-def.anotherauthorisedactivity" type="definition">another authorised activity</defterm>, for the petroleum tenure, means an authorised activity for the tenure under <intref check="valid" refid="ch.2-pt.1" target.guid="_ae224c28-0e3b-4475-a663-d926bb3b8358">part 1</intref>, <intref check="valid" refid="ch.2-pt.1-div.1" target.guid="_7e16aebd-feb5-4967-a527-9711adb9ae66">division 1</intref> or <intref check="valid" refid="ch.2-pt.2" target.guid="_f0429453-3af6-43cd-a6dd-cfc8b78be0a9">part 2</intref>, <intref check="valid" refid="ch.2-pt.2-div.1" target.guid="_526a1e56-68ca-4b89-b8fb-4be7083ed4eb">division 1</intref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_35d2dab1-d5dc-4099-a0f6-a5cc45e78d42" id="sec.186" provision.type="other" spent.amends="0"><no>186</no><heading guid="_aed95a6b-cd4b-4efc-8ffa-34fff92c86bc" id="sec.186-he">Underground water rights—limited additional rights</heading><subclause affected.by.uncommenced="0" guid="_970e3cce-8b48-4780-bf2b-695d3749e783" id="sec.186-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the holder of a petroleum tenure until—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f6e62c01-511c-4870-a1df-b90cee07438d" id="sec.186-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the area of the tenure is in the area declared by gazette notice under the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref> on 18 March 2011 to be a cumulative management area and referred to as the Surat Cumulative Management Area—the day 5 years after the commencement of this section; or</txt></block></li><li guid="_0f09ce00-5b40-4a3b-9225-eb79dedb477c" id="sec.186-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if <intref check="valid" refid="sec.186-ssec.1-para1.a" target.guid="_f6e62c01-511c-4870-a1df-b90cee07438d">paragraph (a)</intref> does not apply—the day 2 years after the commencement of this section; or</txt></block></li><li guid="_b95b210b-7fd2-4095-b874-126d87cc01ee" id="sec.186-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a water licence or water permit is granted to take or interfere with underground water under the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.1277" target.doc.id="act-2000-034" target.guid="_01b47cc4-edba-4b70-924b-3745d31073a3" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act">section 1277</legref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1df8dcdc-f48b-466d-a5ee-a4ec41aefaec" id="sec.186-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The holder of a petroleum tenure may take or interfere with underground water in the area of the tenure for use in the carrying out of another authorised activity for the tenure.</txt><note guid="_0d4084aa-4527-4047-8adb-a7ef3da96c2e" id="sec.186-ssec.2-note" type="example"><heading guid="_e34886d3-37be-4163-83a2-387cfddb391a" id="sec.186-ssec.2-note-he">Note—</heading><block><txt break.before="1">After the relevant period provided for under <intref check="valid" refid="sec.186-ssec.1" target.guid="_970e3cce-8b48-4780-bf2b-695d3749e783">subsection (1)</intref> ends, the holder must be authorised under the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref> to take or interfere with the water.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_9360619f-7c76-4edd-8a11-44c6f93baa98" id="sec.186-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The rights under <intref check="valid" refid="sec.186-ssec.2" target.guid="_1df8dcdc-f48b-466d-a5ee-a4ec41aefaec">subsection (2)</intref> are—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_06e4be5a-b04a-45f8-baf0-2280b720b53c" id="sec.186-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">also <defterm guid="_0f871e88-fa31-4b28-930d-992e8deb835e" id="sec.186-ssec.3-def.undergroundwaterrights" type="definition">underground water rights</defterm> for the petroleum tenure; and</txt></block></li><li guid="_8db444ca-d9b1-4f04-b8d9-14a1b3d4dc97" id="sec.186-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">subject to the tenure holder complying with the holder’s underground water obligations.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c87c42bf-eadf-4a5a-84dd-db30f2a1f486" id="sec.186-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The holder must, in accordance with the requirements prescribed by regulation, measure and report the volume of water taken under <intref check="valid" refid="sec.186-ssec.2" target.guid="_1df8dcdc-f48b-466d-a5ee-a4ec41aefaec">subsection (2)</intref> to the chief executive.</txt></block><penalty guid="_f15014f1-ae2d-4155-9fb1-7fb52bec2ccd" id="sec.186-ssec.4-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_bf2b3777-3b78-4819-8031-56ce2736974e" id="sec.186-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_5c4a3a99-1ff6-464b-9282-2d79d072c9ac" id="sec.186-ssec.5-def.anotherauthorisedactivity_"><txt break.before="1"><defterm guid="_637764c1-55ba-430f-8e0b-722c7f6a00c0" id="sec.186-ssec.5-def.anotherauthorisedactivity" type="definition">another authorised activity</defterm>, for the petroleum tenure, means an authorised activity for the tenure under <intref check="valid" refid="ch.2-pt.1" target.guid="_ae224c28-0e3b-4475-a663-d926bb3b8358">part 1</intref>, <intref check="valid" refid="ch.2-pt.1-div.1" target.guid="_7e16aebd-feb5-4967-a527-9711adb9ae66">division 1</intref> or <intref check="valid" refid="ch.2-pt.2" target.guid="_f0429453-3af6-43cd-a6dd-cfc8b78be0a9">part 2</intref>, <intref check="valid" refid="ch.2-pt.2-div.1" target.guid="_526a1e56-68ca-4b89-b8fb-4be7083ed4eb">division 1</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_ab97a525-aaa0-476f-ad05-843796040a49" id="sec.186-ssec.5-def.cumulativemanagementarea_"><txt break.before="1"><defterm guid="_e4e7a36b-2854-420c-b560-8948d2ea64de" id="sec.186-ssec.5-def.cumulativemanagementarea" type="definition">cumulative management area</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sch.4" target.doc.id="act-2000-034" target.guid="_b009b8e2-6bb9-4e14-9da8-16fb8237721f" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act">schedule 4</legref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_86fcc4b4-2379-4e27-bd9a-33703220a7b4" id="sec.187" provision.type="other" spent.amends="0"><no>187</no><heading guid="_6660213e-1d49-4045-afbc-ffc9e881158c" id="sec.187-he">Water monitoring activities</heading><subclause affected.by.uncommenced="0" guid="_8caee384-72cf-421a-9f69-bda226ed7a54" id="sec.187-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A petroleum tenure holder may carry out any of the following activities in the area of the holder’s tenure to comply with its underground water obligations for the tenure—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cece672c-3444-47bd-be4b-186da52bf55f" id="sec.187-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">gathering information about, or undertaking an assessment of, a water bore;</txt></block></li><li guid="_debfb71c-bcf8-42c7-8412-411106b99876" id="sec.187-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">monitoring effects of the exercise of underground water rights for the tenure;</txt></block></li><li guid="_e11455ba-8d71-40ea-acd0-8f2041b8a657" id="sec.187-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">constructing or plugging and abandoning a water observation bore;</txt></block></li><li guid="_226c6596-c3f5-4c28-8709-493445b3ff61" id="sec.187-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">gathering information for preparing an underground water impact report or final report under the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-2000-034" target.guid="_925a85c9-88dd-4ce0-a3a5-2154f5bf8586" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act">chapter 3</legref>;</txt></block></li><li guid="_5ec5b0a2-7912-4288-a42f-a611c801060b" id="sec.187-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">carrying out any other activity necessary to comply with an underground water obligation of the holder.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_cd19cc86-8aef-465d-9512-2c47438a9efa" id="sec.187-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An activity mentioned in <intref check="valid" refid="sec.187-ssec.1" target.guid="_8caee384-72cf-421a-9f69-bda226ed7a54">subsection (1)</intref> is a <defterm guid="_cec26773-16f5-4fda-bdd8-c40d6dab109f" id="sec.187-def.watermonitoringactivity" type="definition">water monitoring activity</defterm>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8fdd1ff0-4d63-48cf-896f-149cbc6e9d75" id="sec.187-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_ffde9116-c29c-417c-b5fb-8958a76ada29" id="sec.187-ssec.3-def.waterbore_"><txt break.before="1"><defterm guid="_da686eca-da0c-4d16-b014-c04306774d67" id="sec.187-ssec.3-def.waterbore" type="definition">water bore</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sch.4" target.doc.id="act-2000-034" target.guid="_b009b8e2-6bb9-4e14-9da8-16fb8237721f" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act">schedule 4</legref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_43dc3eb3-9be5-4153-90e9-9562cc804511" id="sec.188" provision.type="other" spent.amends="0"><no>188</no><heading guid="_450530b3-c94e-4f57-9cde-6f9b98be1357" id="sec.188-he">Authorisation for <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref></heading><block><txt break.before="1">For the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref>, the taking or interference with or the use of underground water, under the underground water rights, is taken to be authorised.</txt><note guid="_90b0a3a1-3fa5-42b8-b8d9-768d9af67e56" id="sec.188-note" type="example"><heading guid="_16b7cabf-6b52-4f87-a0c6-8c24ecd47d52" id="sec.188-note-he">Note—</heading><block><txt break.before="1">See the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.808" target.doc.id="act-2000-034" target.guid="_472adce7-d425-4e58-a52d-7ff9b203f95e" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act">section 808</legref> (Unauthorised taking, supplying or interfering with water).</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_5b0ffeeb-272a-415f-8bf3-059786cb602d" id="sec.189" provision.type="other" spent.amends="0"><no>189</no><heading guid="_026ec37f-a234-4cca-9b0f-1cdaa5f65eec" id="sec.189-he"><legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref> not otherwise affected</heading><subclause affected.by.uncommenced="0" guid="_c8d52514-0bad-4c93-85cb-f77244ca6ed0" id="sec.189-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">To remove any doubt, it is declared that a petroleum tenure holder can not take or interfere with or use water unless the taking or interference or use is authorised under this part or the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref>.</txt><note guid="_dc59d06d-836c-4c59-9b23-da306d69575b" id="sec.189-ssec.1-note" type="example"><heading guid="_d8e8a0ed-d23f-448f-8f62-c3799f37862a" id="sec.189-ssec.1-note-he">Note—</heading><block><txt break.before="1">See the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.2" target.doc.id="act-2000-034" target.guid="_71daa686-ea9e-4e1f-b8ef-be80c5d38dba" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act">chapter 2</legref>, <legref check="valid" jurisd="QLD" refid="ch.2-pt.2" target.doc.id="act-2000-034" target.guid="_31bfbbd9-a655-4a73-8d17-2ddbdbdef60c" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act">part 2</legref>, <legref check="invalid" jurisd="QLD" type="act">division 1A</legref> and <legref check="valid" jurisd="QLD" refid="sec.808" target.doc.id="act-2000-034" target.guid="_472adce7-d425-4e58-a52d-7ff9b203f95e" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act">section 808</legref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_4e577659-cd09-48b7-b4bb-ea8590ab5698" id="sec.189-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_2ac2de00-6e9a-47b3-9934-702dfbe12b60" id="sec.189-ssec.2-def.water_"><txt break.before="1"><defterm guid="_059158e8-4d3e-4334-a911-f1f21e56c162" id="sec.189-ssec.2-def.water" type="definition">water</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sch.4" target.doc.id="act-2000-034" target.guid="_b009b8e2-6bb9-4e14-9da8-16fb8237721f" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act">schedule 4</legref>.</txt></definition></deflist></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_0ab81628-9fe0-4cda-bc0e-380876944362" id="ch.2-pt.5"><no>Part 5</no><heading guid="_6c04be87-7e94-4dd2-bfde-beb6ed3fce32" id="ch.2-pt.5-he">Water monitoring authorities</heading><division affected.by.uncommenced="0" guid="_90a334ea-63b1-48db-86a7-7a218073e8fb" id="ch.2-pt.5-div.1"><no>Division 1</no><heading guid="_a338fcfb-8f81-4f1b-9d4d-fc24f1d25e98" id="ch.2-pt.5-div.1-he">Obtaining water monitoring authority</heading><clause affected.by.uncommenced="0" guid="_cf4cd7cb-322a-4b8d-8c82-9a41e6657138" id="sec.190" provision.type="other" spent.amends="0"><no>190</no><heading guid="_75889914-18e2-4984-9cc5-99b728318706" id="sec.190-he">Who may apply for water monitoring authority</heading><subclause affected.by.uncommenced="0" guid="_2b2cb0ce-ce44-4d11-8668-34e972f8505a" id="sec.190-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A petroleum tenure holder may apply for a water monitoring authority for stated land outside the area of the tenure to allow the holder to comply with the holder’s underground water obligations for the tenure.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_01c41734-7b75-4922-806e-679ae8e922a9" id="sec.190-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application may be made or granted—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_35b73523-3c70-43c2-9b2b-026ba93e3e5e" id="sec.190-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">over land in the area of another petroleum authority; and</txt></block></li><li guid="_abed5e8d-4264-4e1e-848c-d4d9f7edd4ae" id="sec.190-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for 1 or more petroleum tenures held by the same applicant.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_4ecef476-31e1-4a3c-9477-01e6caef53d9" id="sec.191" provision.type="other" spent.amends="0"><no>191</no><heading guid="_c4aedada-0ed8-4150-a8d3-8af9dff1f031" id="sec.191-he">Requirements for making application</heading><block><txt break.before="1">The application must be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cd931e6c-e171-43b9-b6b9-4de7c03ab365" id="sec.191-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in the approved form; and</txt></block></li><li guid="_ec419824-ba81-4a02-b753-c5b55429dc03" id="sec.191-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">accompanied by the fee prescribed under a regulation.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_ff1770bb-f52c-46e5-b747-e13897efe9ed" id="sec.192" provision.type="other" spent.amends="0"><no>192</no><heading guid="_353fa5a8-bd71-4aa6-ad2b-32a0ca6248bc" id="sec.192-he">Deciding application for water monitoring authority</heading><subclause affected.by.uncommenced="0" guid="_d13566da-d2f3-4cdb-a3c0-0eff1b0cd2fb" id="sec.192-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may grant or refuse the water monitoring authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e11a1c31-527d-449f-8f3f-a61091d31dd6" id="sec.192-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the water monitoring authority must not be granted unless a relevant environmental authority for the water monitoring authority has been issued.</txt><note guid="_d40e7e1c-0637-42be-99af-5a2cac85c7ee" id="sec.192-ssec.2-note" type="example"><heading guid="_cbb24c85-79cf-4a50-a791-981a0c7dd5bd" id="sec.192-ssec.2-note-he">Note—</heading><block><txt break.before="1">If the application relates to acquired land, see also <intref check="valid" refid="sec.30AC" target.guid="_9f663574-cdda-4e64-9f8f-6c6102041022">section 30AC</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_d7410b67-f88c-41b0-bfb2-c684051bad89" id="sec.192-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister may, before deciding the application, seek advice about the application from the chief executive of the department administering the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c4866264-63d7-49ef-8e49-c16e7bdaa0ed" id="sec.192-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The authority must state its area and each petroleum tenure to which it relates.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_effe27b6-1808-40b0-95fa-25e5811f242c" id="sec.192-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The authority may also state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b4d8312b-1387-4428-a709-95feb4dd8116" id="sec.192-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">conditions or other provisions of the authority, other than conditions or provisions that are—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a07776b7-97f3-4a83-b8c5-7d7a8bde5567" id="sec.192-ssec.5-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">inconsistent with <intref check="valid" refid="ch.2-pt.5-div.2" target.guid="_1a18f6a8-f962-4339-9ca6-e04d8a0b948d">division 2</intref> or <intref check="valid" refid="sec.202" target.guid="_30750e13-e21b-469c-b848-00dc23ab09f3">section 202</intref> or <intref check="valid" refid="sec.202A" target.guid="_282c025e-59f9-4fd6-869e-663486054376">202A</intref> or any other mandatory condition for water monitoring authorities; or</txt><note guid="_cafc0172-405d-479f-857b-e29404bdf531" id="sec.192-ssec.5-para1.a-para2.i-note" type="example"><heading guid="_10678398-482b-40ae-8909-833374c0591f" id="sec.192-ssec.5-para1.a-para2.i-note-he">Note—</heading><block><txt break.before="1"><intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">Chapter 5</intref> also imposes mandatory conditions on water monitoring authorities. In particular, see <intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref>, <intref check="valid" refid="ch.5-pt.8" target.guid="_6fd5c183-bb2d-498f-bceb-5e0aff62d198">part 8</intref>.</txt></block></note></block></li><li guid="_65811f64-1e2b-4e7d-963b-8128e8842211" id="sec.192-ssec.5-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">inconsistent with a condition of any petroleum tenure to which the authority relates; or</txt></block></li><li guid="_c9f8c2fd-c5e4-4622-a71b-f4e9eef86126" id="sec.192-ssec.5-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the same as, or substantially the same as, or inconsistent with, any relevant environmental condition for the authority; and</txt></block></li></list></block></li><li guid="_f6dbe26b-6f24-4cfe-95b2-8dd8dcb11404" id="sec.192-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the day it takes effect.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8f4ac6e1-75ff-441a-a985-d02c31b8d52e" id="sec.192-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">However, the provisions of the authority may exclude or restrict the carrying out of water monitoring activities, if the exclusion or restriction does not prevent the holder from complying with the holder’s underground water obligations.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e607d978-4c17-4174-8d6e-6609dd4a8523" id="sec.192-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">The Minister may, as a condition of deciding to grant the authority, require the applicant to do all or any of the following within a stated reasonable period—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_98336c48-bc2d-4636-bbb6-8dcdcf4871a0" id="sec.192-ssec.7-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">pay the annual rent for the first year of the authority;</txt></block></li><li guid="_e960ed2c-ea4b-4134-a0c7-87e03f416564" id="sec.192-ssec.7-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give, under <intref check="valid" refid="sec.488" target.guid="_13f8de44-15a4-4a47-a9af-6464bc374dda">section 488</intref>, security for the authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_784905d6-f16d-488d-b439-7c4a0d9f8a44" id="sec.192-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">If the applicant does not comply with the requirement, the application may be refused.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_1a18f6a8-f962-4339-9ca6-e04d8a0b948d" id="ch.2-pt.5-div.2"><no>Division 2</no><heading guid="_a33323dd-d6d1-400b-8586-0ba563dc3574" id="ch.2-pt.5-div.2-he">Key authorised activities</heading><clause affected.by.uncommenced="0" guid="_80e17b82-d09a-410e-b6ce-dcde29d2fc62" id="sec.193" provision.type="other" spent.amends="0"><no>193</no><heading guid="_cc02c348-7991-4ee7-b19f-4eca86c98bec" id="sec.193-he">Operation of <intref check="valid" refid="ch.2-pt.5-div.2" target.guid="_1a18f6a8-f962-4339-9ca6-e04d8a0b948d">div 2</intref></heading><subclause affected.by.uncommenced="0" guid="_d868ccde-8064-4452-b48c-17f3047c54fc" id="sec.193-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This division provides for the key authorised activities for a water monitoring authority.</txt><note guid="_46e4000a-4f01-41cb-92b7-b4715a819daf" id="sec.193-ssec.1-note" type="example"><heading guid="_88ce4a6d-42a8-493b-ba15-815cdc7b0240" id="sec.193-ssec.1-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_831800f5-10aa-44d7-8c32-79e4dacb50a1" id="sec.193-ssec.1-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">For other authorised activities, see <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.4" target.guid="_b576db0f-1676-41bb-9d2a-0c120f59c456">part 4</intref>, <intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref>, <intref check="valid" refid="ch.5-pt.8" target.guid="_6fd5c183-bb2d-498f-bceb-5e0aff62d198">part 8</intref> and the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-2014-047" target.guid="_78e7ee55-dcff-4087-b0b9-13497e839af3" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">chapter 3</legref>, <legref check="valid" jurisd="QLD" refid="ch.3-pt.2" target.doc.id="act-2014-047" target.guid="_adcc85c6-c389-49c8-b998-858dca31ac1f" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">part 2</legref>.</txt></block></li><li guid="_702b8da5-4919-4fe3-88f7-4a2953ec38fb" id="sec.193-ssec.1-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">The carrying out of particular activities on particular land in a water monitoring authority’s area may not be authorised following the taking of the land under a resumption law. See <intref check="valid" refid="sec.30AB" target.guid="_4abe0a1b-ba8f-40b0-b76e-1e1864fb56ff">section 30AB</intref>.</txt></block></li></list></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_40072d26-2ba8-43ad-84be-147833aecbd5" id="sec.193-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The authorised activities may be carried out despite the rights of an owner or occupier of land on which they are exercised.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_80893c3d-a8b8-40d5-bd66-c38f6b7f121b" id="sec.193-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the carrying out of the authorised activities is subject to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5705590d-3d9c-453f-a84d-42047a21d125" id="sec.193-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0"><intref check="valid" refid="sec.6" target.guid="_6c6a5ac8-799d-44d8-9fef-34a0d04ecce2">sections 6</intref>, <intref check="valid" refid="sec.197" target.guid="_529ba737-f1c3-4812-964d-161e635b26ef">197</intref> and <intref check="valid" refid="sec.198" target.guid="_df9161e4-9878-49ee-8a81-564a52933c20">198</intref>; and</txt></block></li><li guid="_8df93b23-b755-40a3-a5dd-a734e8ed470a" id="sec.193-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0"><intref check="valid" refid="ch.3" target.guid="_7d989cb7-da2a-4737-842c-bd1944dbb54e">chapter 3</intref>, <intref check="valid" refid="ch.3-pt.4" target.guid="_524d4f73-dd39-49b3-b4c7-37b171f90dd6">part 4</intref>, <intref check="valid" refid="ch.3-pt.4-div.2" target.guid="_eda1a8d6-2c2a-455e-ac73-462969bb7c7b">division 2</intref>; and</txt></block></li><li guid="_f3a50ac7-f6c9-48d4-bb8d-b6b800063f7d" id="sec.193-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0"><intref check="valid" refid="ch.3A" target.guid="_4864cab3-5ae5-49c9-aeb6-cdfaa85590af">chapter 3A</intref>, <intref check="valid" refid="ch.3A-pt.5" target.guid="_fa8a3d9c-8f2e-42e4-9995-76304c3d08e0">part 5</intref>; and</txt></block></li><li guid="_58388642-a7d4-46c2-a5fb-959b80cb6890" id="sec.193-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0"><intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref>; and</txt></block></li><li guid="_8531812a-8565-49b7-b0aa-924f4ddf361f" id="sec.193-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the mandatory and other conditions of the authority; and</txt></block></li><li guid="_2978f6b1-8247-4eb4-ba35-a2ebcdee4c5b" id="sec.193-ssec.3-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">any exclusion or restriction provided for in the authority on the carrying out of the activities.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7703f1bf-b6ba-49cb-b48f-3a11dd182057" id="sec.194" provision.type="other" spent.amends="0"><no>194</no><heading guid="_825e8923-46e6-4149-bb18-2470a259dca0" id="sec.194-he">Water monitoring activities</heading><block><txt break.before="1">The authority holder may carry out any water monitoring activity in the area of the authority.</txt></block></clause><clause affected.by.uncommenced="0" guid="_e56d7f8b-e8ab-472a-a520-8eea08177203" id="sec.195" provision.type="other" spent.amends="0"><no>195</no><heading guid="_1d3635b1-c048-4387-a5ee-cba914775d8c" id="sec.195-he">Limited right to take or interfere with underground water</heading><block><txt break.before="1">The authority holder may take or interfere with underground water only to the extent that the taking or interference is the unavoidable result of carrying out a water monitoring activity in the area of the authority.</txt><note guid="_a17f50a6-4974-4648-94b4-5386fed25809" id="sec.195-note" type="example"><heading guid="_2d5d780a-ee19-4979-beec-1a2dcbba382c" id="sec.195-note-he">Example—</heading><block><txt break.before="1">the taking of or interference with underground water during the drilling or maintenance of a water observation bore in the area</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_760de989-94b9-4476-8493-2edcae4778e3" id="sec.196" provision.type="other" spent.amends="0"><no>196</no><heading guid="_0cc0f20b-a18a-4293-be41-fbd3ee16f0cd" id="sec.196-he">Authorisation for <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref></heading><block><txt break.before="1">For the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref>, the taking of or interference with underground water, under <intref check="valid" refid="sec.195" target.guid="_e56d7f8b-e8ab-472a-a520-8eea08177203">section 195</intref>, is taken to be authorised.</txt><note guid="_3566463f-7100-4095-96ac-719bea42548d" id="sec.196-note" type="example"><heading guid="_fddf76a1-f5d5-4b49-8c0f-ff6433c60196" id="sec.196-note-he">Note—</heading><block><txt break.before="1">See the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.808" target.doc.id="act-2000-034" target.guid="_472adce7-d425-4e58-a52d-7ff9b203f95e" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act">section 808</legref> (Unauthorised taking, supplying or interfering with water).</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_529ba737-f1c3-4812-964d-161e635b26ef" id="sec.197" provision.type="other" spent.amends="0"><no>197</no><heading guid="_ad743e4d-d8b6-45d9-9cd1-06c3fadab346" id="sec.197-he"><legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref> not otherwise affected</heading><block><txt break.before="1">To remove any doubt, it is declared that the water monitoring authority holder can not take or interfere with water as defined under the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref> unless the taking or interference is authorised under this division or the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref>.</txt><note guid="_464f9404-0ca5-48dd-ae79-a487ff3f8d7e" id="sec.197-note" type="example"><heading guid="_acfbd3e4-2528-4c61-8be2-64210537c39e" id="sec.197-note-he">Note—</heading><block><txt break.before="1">See the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.2" target.doc.id="act-2000-034" target.guid="_71daa686-ea9e-4e1f-b8ef-be80c5d38dba" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act">chapter 2</legref>, <legref check="valid" jurisd="QLD" refid="ch.2-pt.2" target.doc.id="act-2000-034" target.guid="_31bfbbd9-a655-4a73-8d17-2ddbdbdef60c" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act">part 2</legref>, <legref check="invalid" jurisd="QLD" type="act">division 1A</legref> and <legref check="valid" jurisd="QLD" refid="sec.808" target.doc.id="act-2000-034" target.guid="_472adce7-d425-4e58-a52d-7ff9b203f95e" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act">section 808</legref>.</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_df9161e4-9878-49ee-8a81-564a52933c20" id="sec.198" provision.type="other" spent.amends="0"><no>198</no><heading guid="_d0bbcbf2-65b3-4e90-ac47-fbd6b792e3a3" id="sec.198-he">Restriction on carrying out authorised activities</heading><block><txt break.before="1">In carrying out an authorised activity for the water monitoring authority, the holder must not interfere with the carrying out of an authorised activity for a petroleum tenure, or of another water monitoring authority, the area of which includes the area of the authority.</txt></block><penalty guid="_f624ba60-ede5-4440-a4db-f55a6ea55e22" id="sec.198-pen"><block><txt break.before="1">Maximum penalty—1,000 penalty units.</txt></block></penalty><note guid="_1fbddffe-605d-4b04-92dd-d8763782c44b" id="sec.198-note" type="example"><heading guid="_d107a4ad-e3cb-49f1-92af-16842f41aaba" id="sec.198-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></clause><clause affected.by.uncommenced="0" guid="_fbc1700a-beb0-477a-9471-64efe3ecf547" id="sec.199" provision.type="other" spent.amends="0"><no>199</no><heading guid="_a41ce222-2e79-4fd1-86ae-9844e0dd5c61" id="sec.199-he">No right to petroleum discovered</heading><block><txt break.before="1">To remove any doubt, it is declared that the discovery of petroleum while carrying out an authorised activity for the authority does not, of itself, give the authority holder a right to the petroleum.</txt></block></clause></division><division affected.by.uncommenced="0" guid="_396f440c-5e6a-481f-a129-df6fa681542c" id="ch.2-pt.5-div.3"><no>Division 3</no><heading guid="_b1992593-594f-4811-a3ed-28ba5b794055" id="ch.2-pt.5-div.3-he">Miscellaneous provisions</heading><clause affected.by.uncommenced="0" guid="_4be7e3c5-e846-4ead-aee5-d4702ef42127" id="sec.200" provision.type="other" spent.amends="0"><no>200</no><heading guid="_8354ede2-fa8d-4d4a-aa02-8542dde9a3e6" id="sec.200-he">Term of authority</heading><block><txt break.before="1">Subject to <intref check="valid" refid="ch.10" target.guid="_c24d1b74-938d-44f7-b0f2-d23cd9205275">chapter 10</intref>, <intref check="valid" refid="ch.10-pt.2" target.guid="_6e137e91-d3a4-4a20-aa14-8a85a8409334">part 2</intref>, <intref check="valid" refid="ch.10-pt.2-div.4" target.guid="_93565a11-d5fa-40f7-b2e9-a1e50fa978e7">division 4</intref>, a water monitoring authority continues in force until there is no longer any petroleum tenure to which the authority relates.</txt></block></clause><clause affected.by.uncommenced="0" guid="_28b3a036-fec2-4fb1-8ba6-e4294eae6edb" id="sec.201" provision.type="other" spent.amends="0"><no>201</no><heading guid="_1e6f6d41-a655-4645-bd1a-718bec1fecbd" id="sec.201-he">Provision for who is the authority holder</heading><subclause affected.by.uncommenced="0" guid="_6e3f201e-e73e-4ce3-ba71-7693ab83e8e5" id="sec.201-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If there is only 1 petroleum tenure to which a water monitoring authority relates, the authority holder is taken to be the person who, from time to time, holds the petroleum tenure to which the authority relates.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b1e672fe-939e-465b-a487-f6729c4951b6" id="sec.201-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.201-ssec.3" target.guid="_64a33bf2-5980-41a9-a44b-cd2dc11c631a">Subsections (3)</intref> and <intref check="valid" refid="sec.201-ssec.4" target.guid="_b5b6ff00-fbb8-48af-b71f-8b5ee9d27718">(4)</intref> apply if there is more than 1 petroleum tenure to which a water monitoring authority relates.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_64a33bf2-5980-41a9-a44b-cd2dc11c631a" id="sec.201-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If, as a result of dealings with the tenures, all of the tenures are transferred to the same person, the transferee is taken to be the holder of the authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b5b6ff00-fbb8-48af-b71f-8b5ee9d27718" id="sec.201-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If, as a result of dealings with the tenures, 1 or more but not all of the tenures are transferred to the same person, the person from whom the tenures were transferred continues to be the holder of the water monitoring authority.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_30750e13-e21b-469c-b848-00dc23ab09f3" id="sec.202" provision.type="other" spent.amends="0"><no>202</no><heading guid="_bfd2f168-04f8-4900-a2cd-a88791b9c55c" id="sec.202-he">Additional condition of relevant petroleum tenure</heading><block><txt break.before="1">If a condition is imposed on a water monitoring authority (the <defterm guid="_6e9d47c4-8abe-4f85-b96f-d29c7bb99b23" id="def.authoritycondition-oc.2" type="definition">authority condition</defterm>), it is a condition of each petroleum tenure to which the authority relates that the tenure holder must comply with the authority condition.</txt></block></clause><clause affected.by.uncommenced="0" guid="_282c025e-59f9-4fd6-869e-663486054376" id="sec.202A" provision.type="other" spent.amends="0"><no>202A</no><heading guid="_4f602d72-3e9a-45df-b9ef-b4fef86eed42" id="sec.202A-he">Annual rent</heading><subclause affected.by.uncommenced="0" guid="_b311ff87-3f52-40b6-8d51-b4cb1b9018e0" id="sec.202A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A water monitoring authority holder must pay the State the annual rent, as prescribed under a regulation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e3301ccb-52d5-4532-ba41-608ab33e1a09" id="sec.202A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The annual rent must be paid in the way, and on or before the day, prescribed under a regulation.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_6590baf4-25bf-4d67-8173-1a749c6cfb6b" id="sec.203" provision.type="other" spent.amends="0"><no>203</no><heading guid="_c5e75c46-0404-43ae-a0fb-3ee7b8384c77" id="sec.203-he">Amending water monitoring authority by application</heading><subclause affected.by.uncommenced="0" guid="_9fa1e12d-b5ec-417a-bf04-3a8358dcea19" id="sec.203-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The holder of a water monitoring authority may apply for the amendment of it—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f6725a13-89e4-40bf-a3d4-4b179b6c43ff" id="sec.203-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to increase or decrease its area; or</txt></block></li><li guid="_35b9ff7c-2cba-48fd-8e45-f378cc59ecd1" id="sec.203-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to add or omit, or reflect an amendment of, a petroleum tenure that relates to the authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_87216eac-c6a5-4ed2-9bc6-b4ef6b177b12" id="sec.203-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The holder can not apply for the amendment of the authority in any other way.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_645257fc-a179-4ee6-8319-b25a81830d69" id="sec.203-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The application must be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8d656d4a-94ee-4c5a-9086-8acf2ae4c585" id="sec.203-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in the approved form; and</txt></block></li><li guid="_f1630b32-7645-4006-8eb4-08599544f4d3" id="sec.203-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">accompanied by the fee prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_da14655e-b6a9-46a1-97e5-e47d7f61ca73" id="sec.203-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The Minister may grant or refuse the amendment.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_324104d0-56e6-4622-8af8-d395eb0b7834" id="sec.203-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">However, the Minister may, before deciding the application, seek advice about the application from the chief executive of the department administering the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_64a4b0bd-b1b5-449b-8c89-4ee114b44aa2" id="sec.203-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The amendment may be granted (a <defterm guid="_34035515-ad6f-4119-b974-689d9326c2b4" id="sec.203-def.conditionalgrant" type="definition">conditional grant</defterm>) subject to the applicant’s written agreement to the Minister amending the authority in a stated way that the Minister considers appropriate.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1f64b9c2-21b1-471b-a6c0-a88af9033415" id="sec.203-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">On refusal of the application or the making of a decision to make a conditional grant, the applicant must be given an information notice about the decision to refuse or to make the conditional grant.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_55412cd7-ecff-4e2b-99fa-1c2290aac632" id="ch.2-pt.6"><no>Part 6</no><heading guid="_0396cb38-0562-47ea-8ac0-027320db79b6" id="ch.2-pt.6-he">Third party storage access to natural underground reservoirs</heading><division affected.by.uncommenced="0" guid="_1add5d13-3359-4dcb-bf8f-d4c80ad8bda1" id="ch.2-pt.6-div.1"><no>Division 1</no><heading guid="_070a973a-ff26-4fce-93e5-1879c4a8d814" id="ch.2-pt.6-div.1-he">Purpose of part</heading><clause affected.by.uncommenced="0" guid="_33dda9c9-7baa-4bc9-bb07-cbe01f7134ef" id="sec.204" provision.type="other" spent.amends="0"><no>204</no><heading guid="_8db49214-b213-49a5-94b5-39c6feaeb1f4" id="sec.204-he">Purpose of <intref check="valid" refid="ch.2-pt.6" target.guid="_55412cd7-ecff-4e2b-99fa-1c2290aac632">pt 6</intref></heading><block><txt break.before="1">The purpose of this part is for the State to encourage appropriate use of natural underground reservoirs for storage.</txt></block></clause></division><division affected.by.uncommenced="0" guid="_930ebeab-76f6-4c52-9de1-894f8b7905db" id="ch.2-pt.6-div.2"><no>Division 2</no><heading guid="_8aa31fa8-e285-4706-8701-366e64bc4d76" id="ch.2-pt.6-div.2-he">Storage agreements and related provisions</heading><subdivision affected.by.uncommenced="0" guid="_f2dc31ed-b43f-46ed-8f60-43e76c5c2a4d" id="ch.2-pt.6-div.2-sdiv.1"><no>Subdivision 1</no><heading guid="_27f9e935-2cd2-4c09-bca0-e577954b5bda" id="ch.2-pt.6-div.2-sdiv.1-he">Storage agreements</heading><clause affected.by.uncommenced="0" guid="_1dd78fc2-6141-470d-82bd-df983ee8748d" id="sec.205" provision.type="other" spent.amends="0"><no>205</no><heading guid="_0b9788de-a293-432e-bd30-ec9412c93caa" id="sec.205-he">Meaning of <defterm guid="_a225f968-5861-4fb1-ad90-23318c92426a" type="mention">storage agreement</defterm> and <defterm guid="_dee0b40b-658c-4f1d-998f-39d969ff6897" type="mention">existing user</defterm></heading><subclause affected.by.uncommenced="0" guid="_dc28d74f-ce8c-416b-9578-91f426a71301" id="sec.205-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A petroleum lease holder may agree (a <defterm guid="_37011cb0-46c0-47b1-ae8a-2a3fe1765c52" id="sec.205-def.storageagreement-oc.2" type="definition">storage agreement</defterm>) with someone else (an <defterm guid="_7c16bc32-cfe7-485e-add1-a5a891e17f78" id="sec.205-def.existinguser-oc.2" type="definition">existing user</defterm>) to use a natural underground reservoir in the area of the lease to store petroleum or a prescribed storage gas.</txt><note guid="_0d8a621c-ddc0-4bdf-a2f3-5eea1d2c5d70" id="sec.205-ssec.1-note" type="example"><heading guid="_19cf2994-7c17-4cfd-a258-512f45f68642" id="sec.205-ssec.1-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.220" target.guid="_01a5405c-1ab3-471a-91c5-5e1a69e6222e">section 220</intref> (Preferred tenderer may make storage agreements).</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_e8d22f0d-a239-482b-805f-a9ef9f7a3366" id="sec.205-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the lease holder can not enter into a storage agreement for any of the reservoir’s storage capacity already agreed to be provided under another storage agreement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_54261e57-bc37-4c0a-ad6a-8beb0f9cf80b" id="sec.205-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The existing user may agree with someone else to store petroleum or a prescribed storage gas in the reservoir to the extent of its storage capacity agreed to be used under the existing user’s storage agreement with the lease holder.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_048c7d56-7f09-4d6c-9424-bd4ee973f8b1" id="sec.205-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, the existing user may make the agreement only if it complies with the storage agreement between the lease holder and the existing user.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_524ed9d4-d1e7-4d09-abee-7403b9ef3595" id="sec.205-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">An agreement under <intref check="valid" refid="sec.205-ssec.3" target.guid="_54261e57-bc37-4c0a-ad6a-8beb0f9cf80b">subsection (3)</intref> is also a <defterm guid="_f6fb6b83-bbcc-4c46-a7db-fcc7a67113be" id="sec.205-def.storageagreement-oc.3" type="definition">storage agreement</defterm>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a57003ac-3b05-4753-97ca-5e8c68f4d86f" id="sec.205-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">A person for whom petroleum or a prescribed storage gas is, or is entitled to be, stored under a storage agreement under <intref check="valid" refid="sec.205-ssec.3" target.guid="_54261e57-bc37-4c0a-ad6a-8beb0f9cf80b">subsection (3)</intref> is also an <defterm guid="_f674996e-216f-41d3-937e-24da2f243572" id="sec.205-def.existinguser-oc.3" type="definition">existing user</defterm> of the reservoir.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e3fdc1b5-4bf0-4993-906b-6b6715296d92" id="sec.206" provision.type="other" spent.amends="0"><no>206</no><heading guid="_21c9ccd7-7d80-4324-9912-ab0a7a2e1aff" id="sec.206-he">Development plan overrides storage agreement</heading><block><txt break.before="1">If a provision of a storage agreement conflicts with the development plan for the relevant petroleum lease, the development plan prevails to the extent of the inconsistency.</txt></block></clause><clause affected.by.uncommenced="0" guid="_7ad88bac-cab2-45e2-a1cf-5a26f48658c6" id="sec.207" provision.type="other" spent.amends="0"><no>207</no><heading guid="_6634e9cb-19ac-4303-8241-1a2ee812f17f" id="sec.207-he">Existing user’s obligation to give information</heading><block><txt break.before="1">Each existing user of a natural underground reservoir in the area of a petroleum lease must give the lease holder the information the holder reasonably requires for the safe and reliable use of the reservoir.</txt></block><penalty guid="_55971741-ea5e-4f5e-9946-a7456d9285fa" id="sec.207-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty><note guid="_f15c3b40-6351-4178-8d14-3ab59e01b6fe" id="sec.207-note" type="example"><heading guid="_579a9893-f16d-46d2-a7c2-0e8cbf6fb6d0" id="sec.207-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_bddbb8f4-5759-4a05-960e-4e0a0cd23730" id="ch.2-pt.6-div.2-sdiv.2"><no>Subdivision 2</no><heading guid="_00bdc2f1-176e-4200-a2d9-880de736d79d" id="ch.2-pt.6-div.2-sdiv.2-he">Negotiation obligations of petroleum lease holders and existing users</heading><clause affected.by.uncommenced="0" guid="_8f1dab85-89a4-4d92-9cab-fb55fe7b9656" id="sec.208" provision.type="other" spent.amends="0"><no>208</no><heading guid="_e2e94e4c-9632-41e4-8f07-2e1cbbf05851" id="sec.208-he">Application of <intref check="valid" refid="ch.2-pt.6-div.2-sdiv.2" target.guid="_bddbb8f4-5759-4a05-960e-4e0a0cd23730">sdiv 2</intref></heading><subclause affected.by.uncommenced="0" guid="_92fd72da-6667-48fa-b7cf-a9dcdd8fc517" id="sec.208-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This subdivision applies to a petroleum lease holder or an existing user who has available storage capacity for a natural underground reservoir.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f281a84f-09b4-427a-9f69-2e5da8ab2ae0" id="sec.208-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A petroleum lease holder has <defterm guid="_0c42efe1-8b67-4c2b-b764-bb26bcea1a61" id="sec.208-def.availablestoragecapacity" type="definition">available storage capacity</defterm> for a natural underground reservoir if the reservoir is in the area of the lease and it has, or is likely to have, storage capacity that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_32093234-71d9-4b36-8cf6-a5965899fbf0" id="sec.208-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the lease holder has not already agreed to provide under a storage agreement that is in force (the <defterm guid="_3c8483c1-b820-42e9-b050-beb46f8b50c5" id="sec.208-ssec.2-def.contractedcapacity" type="definition">contracted capacity</defterm>); and</txt></block></li><li guid="_bec9fab5-22d2-4113-af01-b17aa3221cbf" id="sec.208-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">does not interfere with the carrying out of authorised activities for the lease; and</txt></block></li><li guid="_6a9e8f3b-b56f-4b4d-9c79-bbecc4b0db7c" id="sec.208-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">is either—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b7515bb5-44ab-4e97-a77b-ae5719408a18" id="sec.208-ssec.2-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">spare; or</txt></block></li><li guid="_e120f55e-58d4-4e7d-bdae-be7a0941675b" id="sec.208-ssec.2-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">would, if additions of plant were made, or works carried out to increase the reservoir’s storage capacity, be spare; and</txt><note guid="_38f34b3c-396a-45f3-a9f4-188b3a0ca951" id="sec.208-ssec.2-para1.c-para2.ii-note" type="example"><heading guid="_75798d22-338c-4147-8bf3-3f4ef92425ae" id="sec.208-ssec.2-para1.c-para2.ii-note-he">Note—</heading><block><txt break.before="1">Storage capacity mentioned in <intref check="valid" refid="sec.208-ssec.2-para1.c-para2.ii" target.guid="_e120f55e-58d4-4e7d-bdae-be7a0941675b">subparagraph (ii)</intref> is commonly called developable capacity.</txt></block></note></block></li></list></block></li><li guid="_ab083e95-5f5c-4b6b-a7d1-7c0892f823b5" id="sec.208-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">is technically and practicably feasible, safe and reliable to use.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6f35e297-2f88-4a91-9717-f60a3dfcc746" id="sec.208-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the contracted capacity, or a part of the contracted capacity, becomes available storage capacity again if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f26d5b98-2644-498f-b730-bb8c4f73ef5a" id="sec.208-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the existing user of the reservoir gives the lease holder a notice stating the user no longer requires that capacity; and</txt></block></li><li guid="_8ad00ba4-67cc-4dc9-87e9-d934151fb09a" id="sec.208-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the contracted capacity would otherwise be available storage capacity under <intref check="valid" refid="sec.208-ssec.2" target.guid="_f281a84f-09b4-427a-9f69-2e5da8ab2ae0">subsection (2)</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_032c4205-efd8-4be7-b93b-27096ea00b41" id="sec.208-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A notice under <intref check="valid" refid="sec.208-ssec.3" target.guid="_6f35e297-2f88-4a91-9717-f60a3dfcc746">subsection (3)</intref><intref check="valid" refid="sec.208-ssec.3-para1.a" target.guid="_f26d5b98-2644-498f-b730-bb8c4f73ef5a">(a)</intref> may be given for all or a stated part of the contracted capacity.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4974df17-95b6-4a36-bcf4-628d133d9a49" id="sec.208-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">An existing user of a natural underground reservoir has <defterm guid="_247109ad-702b-4b3e-a1de-8a1e0a2c5691" id="sec.208-def.availablestoragecapacity-oc.2" type="definition">available storage capacity</defterm> if the reservoir has, or is likely to have, storage capacity agreed to be provided to the existing user under a storage agreement that the existing user is not using and does not expect to use.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_630465ba-d1c7-4684-bfd3-ebeb14858755" id="sec.209" provision.type="other" spent.amends="0"><no>209</no><heading guid="_96c72546-4dca-4c00-8ba4-35ab4a0dad20" id="sec.209-he">Obligation to negotiate with proposed users</heading><subclause affected.by.uncommenced="0" guid="_974dedb7-972d-4881-a676-e70844cefbab" id="sec.209-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person (a <defterm guid="_e249af08-6e50-4331-9970-27e1e01dfb92" id="sec.209-def.proposeduser" type="definition">proposed user</defterm>) may give the lease holder or existing user a notice requiring the holder or existing user to, within a stated reasonable time, start negotiations to attempt to reach a storage agreement for available storage capacity for the reservoir.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a2e2b240-4f3d-4f48-bd32-24a65e2157b1" id="sec.209-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.210" target.guid="_90c2827f-f639-455a-a0e7-2b223ba25d78">section 210</intref>, the holder or existing user must negotiate in good faith with the proposed user to attempt to reach a fair and reasonable storage agreement with the proposed user.</txt></block><penalty guid="_3cadb8bd-36b6-47cf-9baa-d071aae21f27" id="sec.209-ssec.2-pen"><block><txt break.before="1">Maximum penalty for <intref check="valid" refid="sec.209-ssec.2" target.guid="_a2e2b240-4f3d-4f48-bd32-24a65e2157b1">subsection (2)</intref>—500 penalty units.</txt></block></penalty></subclause></clause><clause affected.by.uncommenced="0" guid="_90c2827f-f639-455a-a0e7-2b223ba25d78" id="sec.210" provision.type="other" spent.amends="0"><no>210</no><heading guid="_fda3d900-e231-4f12-b256-fac528ed0de8" id="sec.210-he">Obligation about priority for proposed users</heading><subclause affected.by.uncommenced="0" guid="_47ea13ed-8de7-4698-b898-f0768a81a5cd" id="sec.210-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3eb6e23a-1dc5-43a9-a081-45f43cda2e35" id="sec.210-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a petroleum lease holder or existing user has started negotiations mentioned in <intref check="valid" refid="sec.209" target.guid="_630465ba-d1c7-4684-bfd3-ebeb14858755">section 209</intref><intref check="valid" refid="sec.209-ssec.2" target.guid="_a2e2b240-4f3d-4f48-bd32-24a65e2157b1">(2)</intref> (the <defterm guid="_e5501efa-344a-4666-9a68-de7e1758cc95" id="sec.210-ssec.1-def.firstnegotiations" type="definition">first negotiations</defterm>) with a proposed user; and</txt></block></li><li guid="_b299b5af-9b89-4325-9ef9-b2b3b2bbcdeb" id="sec.210-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">after the start of the first negotiations, the lease holder or existing user starts negotiations mentioned in <intref check="valid" refid="sec.209" target.guid="_630465ba-d1c7-4684-bfd3-ebeb14858755">section 209</intref><intref check="valid" refid="sec.209-ssec.2" target.guid="_a2e2b240-4f3d-4f48-bd32-24a65e2157b1">(2)</intref> (the <defterm guid="_a7b79165-a219-4668-94b1-58f1a1c9e367" id="sec.210-ssec.1-def.secondnegotiations" type="definition">second negotiations</defterm>) with another proposed user; and</txt></block></li><li guid="_c9fbb9a8-fad3-46d0-9e16-1dbae9b2b8c1" id="sec.210-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the first negotiations have not ended;</txt></block></li></list></block><block><txt break.before="1">the lease holder or existing user must, as far as practicable, ensure the first negotiations are not unreasonably affected by the second negotiations.</txt></block><penalty guid="_9367dbc0-9dd8-453e-b8c0-579150682bda" id="sec.210-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_b69741e7-f610-4d6d-babf-feb7c1ead9e2" id="sec.210-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite <intref check="valid" refid="sec.210-ssec.1" target.guid="_47ea13ed-8de7-4698-b898-f0768a81a5cd">subsection (1)</intref>, the existing user has priority to negotiate for the storage capacity of the reservoir that will, when the storage agreement by the lease holder (the <defterm guid="_62d2ac46-9416-4a03-9252-10e919ad395a" id="sec.210-def.existingagreement" type="definition">existing agreement</defterm>) ends, be available storage capacity for the lease holder.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4588c1d9-9a6e-4dc3-aa4c-b63fb1bbf8b4" id="sec.210-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the priority under <intref check="valid" refid="sec.210-ssec.2" target.guid="_b69741e7-f610-4d6d-babf-feb7c1ead9e2">subsection (2)</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_201f315d-0426-4b9a-b9cb-a61ba8c0afcf" id="sec.210-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">applies only to the extent the storage capacity sought is no more than the existing user’s entitlement under the existing agreement in the last year before it is to end according to its provisions; and</txt></block></li><li guid="_447354f3-1599-4a8a-8e61-fe121b2f63ff" id="sec.210-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">ceases 2 years before the existing agreement ends.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c30b11c0-bbb8-4c19-9fb4-97ff6356c735" id="sec.211" provision.type="other" spent.amends="0"><no>211</no><heading guid="_069047d5-c231-4add-8858-1f5423d36f4b" id="sec.211-he">Obligation to give information</heading><subclause affected.by.uncommenced="0" guid="_006769e9-bfec-4653-bd55-a9ef8f776cd1" id="sec.211-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A proposed user may ask the lease holder or existing user for all information that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_17bc9617-0c24-43ce-a999-08626d4bc7d5" id="sec.211-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the lease holder or existing user has about the lease holder’s or existing user’s available storage capacity for the reservoir; and</txt></block></li><li guid="_8ab22b2b-dcf0-4734-ad3a-a155448588c2" id="sec.211-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is reasonably necessary to allow the proposed user to negotiate a fair and reasonable storage agreement with the lease holder or existing user.</txt></block></li></list><note guid="_ad10a6ea-d923-4b54-8246-6c511279845d" id="sec.211-ssec.1-note" type="example"><heading guid="_0abc344e-9c58-4969-b4ef-a9a48129fd7d" id="sec.211-ssec.1-note-he">Examples of possible information about available storage capacity—</heading><block><txt break.before="1">the amount of the storage capacity and details of the nature and quality of gas already stored in the reservoir</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_9587df20-fd8a-40ad-9a65-2472f6111acd" id="sec.211-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The lease holder or existing user must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_49481871-bce7-44de-827b-dbbac447bcea" id="sec.211-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">give the information within a reasonable period after receiving the request; and</txt></block></li><li guid="_0c0e919b-e755-4d82-a9c3-af45e3a3b9af" id="sec.211-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the information has been sought by, or given to another proposed user—ensure it is given on a non-discriminatory basis.</txt></block></li></list></block><penalty guid="_a84064fd-42df-4b3b-94c9-99d522752423" id="sec.211-ssec.2-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_1b770e2b-15b6-4113-9739-ea64f24abfa8" id="sec.211-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For <intref check="valid" refid="sec.211-ssec.2" target.guid="_9587df20-fd8a-40ad-9a65-2472f6111acd">subsection (2)</intref><intref check="valid" refid="sec.211-ssec.2-para1.b" target.guid="_0c0e919b-e755-4d82-a9c3-af45e3a3b9af">(b)</intref>, information is given on a non-discriminatory basis if it is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d2f7317c-4920-42f3-9047-eb8451f24d08" id="sec.211-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the same, or substantially the same, information as that given to other proposed users; or</txt></block></li><li guid="_ead7e766-d013-466f-893e-ccb63b434d2b" id="sec.211-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">not so different from information given to other proposed users as to disadvantage the proposed user.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8a47ea4f-fd76-476e-bd5e-60e7a8b6f845" id="sec.211-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">For <intref check="valid" refid="sec.211-ssec.3" target.guid="_1b770e2b-15b6-4113-9739-ea64f24abfa8">subsection (3)</intref><intref check="valid" refid="sec.211-ssec.3-para1.a" target.guid="_d2f7317c-4920-42f3-9047-eb8451f24d08">(a)</intref>, if the reservoir’s available storage capacity has changed since someone else was given the information, the information given to the proposed user is taken to be substantially the same if, other than for differences that reflect the change, it is the same or substantially the same.</txt></block></subclause></clause></subdivision></division><division affected.by.uncommenced="0" guid="_fdcb9028-dc52-4ad5-9359-62ed5afd2f91" id="ch.2-pt.6-div.3"><no>Division 3</no><heading guid="_02317898-6af5-449f-8f2b-95b27538da4c" id="ch.2-pt.6-div.3-he">Provisions for stored petroleum or prescribed storage gas after petroleum lease ends</heading><subdivision affected.by.uncommenced="0" guid="_76f0972f-1a85-40a6-b5c9-1795f1c74912" id="ch.2-pt.6-div.3-sdiv.1"><no>Subdivision 1</no><heading guid="_c025c9b2-e3c4-46c1-b474-567f1a44e8c7" id="ch.2-pt.6-div.3-sdiv.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_c8094af7-5be6-4692-bdfb-6721f650ebfe" id="sec.212" provision.type="other" spent.amends="0"><no>212</no><heading guid="_13324696-3d3a-46af-8e14-f5109d9df37c" id="sec.212-he">Application of <intref check="valid" refid="ch.2-pt.6-div.3" target.guid="_fdcb9028-dc52-4ad5-9359-62ed5afd2f91">div 3</intref></heading><subclause affected.by.uncommenced="0" guid="_e6562798-0fe2-4a5c-992d-031e4de6796f" id="sec.212-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This division applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_096ef9c8-572a-48bf-84dc-bb1e912d8d8b" id="sec.212-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a petroleum lease (the <defterm guid="_151be1a1-96d7-4594-ac57-cd2161c6c9de" id="sec.212-ssec.1-def.oldlease" type="definition">old lease</defterm>) ends; and</txt></block></li><li guid="_c891e3a1-6b71-4fce-8983-0db85e7fcc12" id="sec.212-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a natural underground reservoir in the area of the old lease is, under a storage agreement, being used to store petroleum or a prescribed storage gas.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_eec4b0d9-7a50-4805-b495-15946e0f102e" id="sec.212-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.212-ssec.1" target.guid="_e6562798-0fe2-4a5c-992d-031e4de6796f">subsection (1)</intref><intref check="valid" refid="sec.212-ssec.1-para1.a" target.guid="_096ef9c8-572a-48bf-84dc-bb1e912d8d8b">(a)</intref>, if an application has been made to renew the old lease and the application is refused, the old lease does not end until the refusal takes effect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e3a278f9-8da7-4705-ad77-1570b1fce4c6" id="sec.212-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0"><intref check="valid" refid="sec.212-ssec.1" target.guid="_e6562798-0fe2-4a5c-992d-031e4de6796f">Subsection (1)</intref> applies even if the storage agreement has, under its own terms, ceased to have effect.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_7c618f06-d847-43b4-8055-52d72459f36d" id="ch.2-pt.6-div.3-sdiv.2"><no>Subdivision 2</no><heading guid="_b86a730a-e8fb-44c2-b001-277613de5102" id="ch.2-pt.6-div.3-sdiv.2-he">Claiming stored petroleum or prescribed storage gas</heading><clause affected.by.uncommenced="0" guid="_1c3a0b45-7084-423c-bee1-987a003ce0d7" id="sec.213" provision.type="other" spent.amends="0"><no>213</no><heading guid="_eb5d37ae-e01c-4c55-b7ca-8a1bcb4e58fe" id="sec.213-he">Notice to claim for stored petroleum or prescribed storage gas</heading><subclause affected.by.uncommenced="0" guid="_fad8b8e9-5538-466b-87f5-8077bf945261" id="sec.213-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister must by gazette notice, invite anyone who claims ownership of the stored petroleum or prescribed storage gas to make that claim by giving a notice that complies with <intref check="valid" refid="sec.213-ssec.2" target.guid="_dcfde3c5-e474-463a-bc79-3f2a8520ed3b">subsection (2)</intref> (a <defterm guid="_92f7304e-fda9-4fc2-a816-80bedfbe4262" id="sec.213-def.noticeofclaim" type="definition">notice of claim</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_dcfde3c5-e474-463a-bc79-3f2a8520ed3b" id="sec.213-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A notice of claim must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4bbca151-9ee9-478e-8c97-2e72959e0903" id="sec.213-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be lodged within 30 business days after the gazettal; and</txt></block></li><li guid="_d7aeab4f-d93f-4f63-bb14-13d59f177c73" id="sec.213-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state details, and include evidence of, each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ccc34390-1e44-489e-9e59-a96c327bb4cd" id="sec.213-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">any relevant storage agreement;</txt></block></li><li guid="_04bea157-e15e-49fe-b6c0-b04a2be81a23" id="sec.213-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">how the claimant became the owner of the stored petroleum or prescribed storage gas;</txt></block></li><li guid="_a09a58c3-67a7-451a-87eb-74a1ff25b9f6" id="sec.213-ssec.2-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">how much of the stored petroleum or prescribed storage gas is claimed;</txt></block></li><li guid="_2f153b0d-fce9-4459-80bf-f6fee12b3a4a" id="sec.213-ssec.2-para1.b-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">steps taken by the claimant to recover the stored petroleum or prescribed storage gas during the term of the old lease; and</txt></block></li></list></block></li><li guid="_b1dcf0f0-d06e-4112-872a-5a5c3c5c2f10" id="sec.213-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">be accompanied by the fee prescribed under a regulation.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0e796817-5b4b-470a-863b-ef9fe0128480" id="sec.214" provision.type="other" spent.amends="0"><no>214</no><heading guid="_5a6785e6-efc3-497d-a7a9-a83bc37305e1" id="sec.214-he">Property in stored petroleum or prescribed storage gas if no notice of claim</heading><block><txt break.before="1">If no notice of claim is lodged within the 30 business days, the stored petroleum and prescribed storage gas is taken to have become the property of the State immediately after the old lease ended.</txt><note guid="_ee9c1e5b-b01e-4b72-8da0-bdc82b715ed2" id="sec.214-note" type="example"><heading guid="_a6441959-2c83-49d5-aea7-5661bb6e2130" id="sec.214-note-he">Note—</heading><block><txt break.before="1">For property in other petroleum in the reservoir, see <intref check="valid" refid="sec.26" target.guid="_bd4941a4-05b3-4308-8d5b-a56b88ad90a1">section 26</intref>.</txt></block></note></block></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_115abf65-8fff-4d72-813d-65f012e87042" id="ch.2-pt.6-div.3-sdiv.3"><no>Subdivision 3</no><heading guid="_ec742236-00cd-48b4-a221-23aa863f0ac9" id="ch.2-pt.6-div.3-sdiv.3-he">Deciding claims</heading><clause affected.by.uncommenced="0" guid="_8ad230a2-3200-47f1-940a-690c22f3b974" id="sec.215" provision.type="other" spent.amends="0"><no>215</no><heading guid="_631e52ee-6aee-46e0-b9be-dfebae6990ce" id="sec.215-he">Deciding claims</heading><subclause affected.by.uncommenced="0" guid="_48a99dd8-5690-4502-9473-ce0b3f18b4aa" id="sec.215-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if within the 30 business days, a notice of claim is lodged.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_faae6681-87cd-465a-a48c-c9dc40889c87" id="sec.215-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister must decide whether, immediately before the old lease ended, the claimant owned any of the stored petroleum or prescribed storage gas.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fb2054fd-d52c-4685-adf0-67ca8aaba0db" id="sec.215-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister may decide that the claimant does not own any of the stored petroleum or prescribed storage gas if the Minister considers the claimant did not take reasonable steps to recover it during the term of the old lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0b086b83-81fd-4679-b83b-4eca93b21e5e" id="sec.215-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0"><intref check="valid" refid="sec.215-ssec.3" target.guid="_fb2054fd-d52c-4685-adf0-67ca8aaba0db">Subsection (3)</intref> applies even if the Minister would, other than for the subsection, have decided that the claimant owned the stored petroleum or prescribed storage gas immediately before the old lease ended.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1d6c3c77-b67e-4436-af99-570ee3cd3cd2" id="sec.215-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If it is decided that the claimant owns any of the stored petroleum or prescribed storage gas, the claimant is taken to have been its owner from when the old lease ended.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b17c0622-ee87-48f1-a8b9-a300a5841d95" id="sec.215-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">On deciding a claimant does not own any of the stored petroleum or prescribed storage gas claimed, the claimant must be given an information notice about the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_60897d68-f8de-4dce-8e15-d3a7b527fa48" id="sec.216" provision.type="other" spent.amends="0"><no>216</no><heading guid="_499b7665-5583-475d-8b9a-8abd930a5f7f" id="sec.216-he">State property in stored petroleum or prescribed storage gas to extent claims are not upheld</heading><subclause affected.by.uncommenced="0" guid="_10993846-1fd3-4dc6-91b5-e6a7ce44cf30" id="sec.216-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If, under <intref check="valid" refid="sec.215" target.guid="_8ad230a2-3200-47f1-940a-690c22f3b974">section 215</intref>, it is decided that no claimant owned any of the stored petroleum or prescribed storage gas, the gas is taken to have become the property of the State immediately after the old lease ended.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1f5ed52e-9025-47d3-b261-2613c7855a00" id="sec.216-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If, under <intref check="valid" refid="sec.215" target.guid="_8ad230a2-3200-47f1-940a-690c22f3b974">section 215</intref>, it is decided that no claimant owned part of the stored petroleum or prescribed storage gas, that part is taken to have become the property of the State immediately after the old lease ended.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_11993b0b-d79d-4661-b418-dafa00af4b59" id="ch.2-pt.6-div.3-sdiv.4"><no>Subdivision 4</no><heading guid="_3679f371-c4c2-4c40-a4f4-1c1916fca3e0" id="ch.2-pt.6-div.3-sdiv.4-he">Dealing with upheld claims</heading><clause affected.by.uncommenced="0" guid="_dab83383-5a3a-4a48-93a6-0a2635bc694c" id="sec.217" provision.type="other" spent.amends="0"><no>217</no><heading guid="_bb358023-5196-4de5-b4ce-67bfa178667f" id="sec.217-he">Application of <intref check="valid" refid="ch.2-pt.6-div.3-sdiv.4" target.guid="_11993b0b-d79d-4661-b418-dafa00af4b59">sdiv 4</intref></heading><block><txt break.before="1">This subdivision applies if, under <intref check="valid" refid="sec.215" target.guid="_8ad230a2-3200-47f1-940a-690c22f3b974">section 215</intref>, it is decided any claimant owns any of the stored petroleum or prescribed storage gas.</txt></block></clause><clause affected.by.uncommenced="0" guid="_b9d43957-9b79-4e70-92cf-cb36281c0fc0" id="sec.218" provision.type="other" spent.amends="0"><no>218</no><heading guid="_7bc7b8cd-e78d-4b2a-b1b6-5cd6e37b7866" id="sec.218-he">Call for tenders required</heading><block><txt break.before="1">The Minister must make a call for tenders under <intref check="valid" refid="sec.127" target.guid="_6a587d42-acca-4fdd-9d32-8061b1e8ce8d">section 127</intref> for a proposed petroleum lease the area of which includes the reservoir.</txt></block></clause><clause affected.by.uncommenced="0" guid="_b67f218c-9aec-4063-b59e-4db39fe1b301" id="sec.219" provision.type="other" spent.amends="0"><no>219</no><heading guid="_8e8dee30-90c3-41d9-88e8-97f6631054b2" id="sec.219-he">Requirement to notify change in ownership</heading><subclause affected.by.uncommenced="0" guid="_6ca7e5f4-4d12-4eb7-b093-8c295e919223" id="sec.219-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the claimant ceases to own any of the stored petroleum or prescribed storage gas, the claimant must lodge a notice stating—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_64d4bf89-d60e-4702-a8a2-1a00c494460d" id="sec.219-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the name and contact details of any new owner of the stored petroleum or prescribed storage gas; and</txt></block></li><li guid="_59876278-3593-479d-aca4-868ec17b4ee6" id="sec.219-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">how much of the stored petroleum or prescribed storage gas the new owner became the owner of.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_878fe617-1244-4862-9fd9-3bfb53da572e" id="sec.219-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the new owner, or anyone who subsequently acquires any of the stored petroleum or prescribed storage gas, ceases to own any of the stored petroleum or prescribed storage gas, the new owner or other person must lodge a notice under <intref check="valid" refid="sec.219-ssec.1" target.guid="_6ca7e5f4-4d12-4eb7-b093-8c295e919223">subsection (1)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f3a15f3d-73f9-4053-b587-93f7e83c8bf6" id="sec.219-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">This section does not apply or ceases to apply if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e32738f4-17f0-4baf-b3e5-15845147f2b6" id="sec.219-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the petroleum or prescribed storage gas ceases to be stored in the reservoir; or</txt></block></li><li guid="_3853c419-033f-48a1-9d2d-f29ed41f5780" id="sec.219-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the claimant or any new owner is granted a petroleum lease the area of which includes the reservoir; or</txt></block></li><li guid="_5afbe01f-7e89-4689-b464-e046f841bc39" id="sec.219-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a storage agreement is made for the stored petroleum or prescribed storage gas to which agreement the claimant or any new owner is a party; or</txt></block></li><li guid="_b29db49f-823a-4609-a920-87ab3d4b1c22" id="sec.219-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">under <intref check="valid" refid="sec.226" target.guid="_409e460f-542b-4719-8b27-aaf3eb2e082c">section 226</intref>, the stored petroleum or prescribed storage gas becomes the property of the State.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_01a5405c-1ab3-471a-91c5-5e1a69e6222e" id="sec.220" provision.type="other" spent.amends="0"><no>220</no><heading guid="_e2cf7fb7-caab-49db-bbb6-1d74a949013a" id="sec.220-he">Preferred tenderer may make storage agreements</heading><subclause affected.by.uncommenced="0" guid="_1fa0bc0e-e893-4712-a013-bc9ba4d55099" id="sec.220-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A preferred tenderer appointed for the call for tenders may enter into a storage agreement with the following persons, as if the preferred tenderer held the petroleum lease and the lease has taken effect—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1b503242-94ff-4e6f-8120-1f24b478a413" id="sec.220-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if no notices have been lodged under <intref check="valid" refid="sec.219" target.guid="_b67f218c-9aec-4063-b59e-4db39fe1b301">section 219</intref>—the claimant;</txt></block></li><li guid="_6e5e8237-fd57-4e26-869c-75e9cc83dc8d" id="sec.220-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if any notice has been lodged under <intref check="valid" refid="sec.219" target.guid="_b67f218c-9aec-4063-b59e-4db39fe1b301">section 219</intref>—any person who, according to notices lodged under that section, owns the stored petroleum or prescribed storage gas.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1249e861-95e0-4bb6-a5fc-4951d4708de0" id="sec.220-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A person with whom the preferred tenderer may, under <intref check="valid" refid="sec.220-ssec.1" target.guid="_1fa0bc0e-e893-4712-a013-bc9ba4d55099">subsection (1)</intref>, enter into a storage agreement is a <defterm guid="_d78ca43c-cd21-45c7-8a7f-3821a98da30c" id="sec.220-def.currentowner" type="definition">current owner</defterm> of the stored petroleum or prescribed storage gas.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_258b2335-28ef-4c6d-893b-d1ae9a89913c" id="sec.221" provision.type="other" spent.amends="0"><no>221</no><heading guid="_84ae72e6-de76-4232-a11d-d3f0a4656234" id="sec.221-he">Negotiation notice</heading><subclause affected.by.uncommenced="0" guid="_025f0b30-3b21-4c45-8f6b-651b7b79b00d" id="sec.221-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, as a result of the call for tenders, a petroleum lease (a <defterm guid="_799dab1f-8423-4567-9e0e-ffd6781a6b16" id="sec.221-def.nonownerlease" type="definition">non-owner lease</defterm>) is granted to someone other than a current owner of the stored petroleum or prescribed storage gas.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4f9e5d59-acda-4dca-bffb-bf30119327bc" id="sec.221-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_eed588ef-b15b-416a-9f9b-f8584d8fc3df" id="sec.221-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">give each current owner of the stored petroleum or prescribed storage gas a notice (a <defterm guid="_9e896947-d9fe-498c-b776-9d37f91040ea" id="sec.221-ssec.2-def.negotiationnotice" type="definition">negotiation notice</defterm>) stating—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_527ed3c2-83a8-4c8a-996d-58ff5589e253" id="sec.221-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">who holds the non-owner lease; and</txt></block></li><li guid="_ff83f175-dec9-40fd-aa0e-1405855aef42" id="sec.221-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a period within which all current owners of the stored petroleum or prescribed storage gas have to reach a storage agreement with the holder; and</txt></block></li></list></block></li><li guid="_13697bfb-03ba-4c4d-a2f2-057219003973" id="sec.221-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give the holder a copy of the negotiation notice.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0702938d-20df-43e2-a160-480f13e66827" id="sec.222" provision.type="other" spent.amends="0"><no>222</no><heading guid="_43500624-0dbb-4749-9dfb-5fd0cb65f9ae" id="sec.222-he">Obligation of holder to negotiate with current owners</heading><block><txt break.before="1">On the giving of the negotiation notice to the non-owner lease holder, the holder must, in good faith, negotiate with all current owners of the stored petroleum or prescribed storage gas to attempt to reach a fair and reasonable storage agreement with them.</txt></block></clause><clause affected.by.uncommenced="0" guid="_e08ee895-e80a-47f5-a4ec-6185ba4fa7d7" id="sec.223" provision.type="other" spent.amends="0"><no>223</no><heading guid="_1fb73155-29fd-4d2f-b790-fefa4275dd1c" id="sec.223-he">Taking of effect of non-owner lease</heading><subclause affected.by.uncommenced="0" guid="_76cce922-d47f-4410-9ded-9ebf3190061d" id="sec.223-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies despite <intref check="valid" refid="sec.123" target.guid="_ef44ece4-3399-4e95-8180-52c9dbb8d1b6">section 123</intref> and any provision of a non-owner lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3afa924f-9aad-445f-b383-95640ad284b4" id="sec.223-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The non-owner lease does not take effect until the day of effect fixed by the Minister, as notified to its holder.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fc7891bf-434a-4950-a09e-d7017751ccba" id="sec.223-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister must not fix the day of effect unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e6104ea4-8247-4eeb-b55b-5e20d73fadcf" id="sec.223-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the holder has lodged a notice stating that the holder has entered into a storage agreement with any current owner of stored petroleum or prescribed storage gas; or</txt></block></li><li guid="_84a2f71c-d665-441a-a306-bb0d6c9ca854" id="sec.223-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">all current owners of the stored petroleum or prescribed storage gas have lodged a notice relinquishing their ownership of any of the stored petroleum or prescribed storage gas (an <defterm guid="_287882f3-093a-434e-a5f0-7a202b0e65c7" id="sec.223-ssec.3-def.ownershiprelinquishmentnotice" type="definition">ownership relinquishment notice</defterm>); or</txt></block></li><li guid="_791e2a53-d2da-4381-b80c-cc95461b3ed3" id="sec.223-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the period stated in the negotiation notice has ended and the Minister is satisfied the holder has complied with <intref check="valid" refid="sec.222" target.guid="_0702938d-20df-43e2-a160-480f13e66827">section 222</intref>.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_dc49e772-03e1-4f80-b8eb-7582914b280a" id="sec.224" provision.type="other" spent.amends="0"><no>224</no><heading guid="_85a334db-e86e-4552-b01f-96f8a9047e93" id="sec.224-he">Cancellation of non-owner lease in particular circumstances</heading><block><txt break.before="1">Subject to <intref check="valid" refid="sec.225" target.guid="_bec5821f-fd1d-43da-8834-4e86db26648d">section 225</intref>, the non-owner lease is cancelled and is taken never to have had any effect if the Minister has not fixed the day of effect before the last of the following days—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d63336e0-6871-454f-967a-f9af0884605a" id="sec.224-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the day of the first anniversary of the grant of the non-owner lease;</txt></block></li><li guid="_aff20957-76d0-4cfd-bf24-6cebf2677883" id="sec.224-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a later day stated in the non-owner lease.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_bec5821f-fd1d-43da-8834-4e86db26648d" id="sec.225" provision.type="other" spent.amends="0"><no>225</no><heading guid="_088aa4c9-7fc7-45fa-9020-6d8c6179cbde" id="sec.225-he">Annual rent for non-owner lease</heading><subclause affected.by.uncommenced="0" guid="_0d252bb4-280f-4047-a4cd-df46c5cec3a8" id="sec.225-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies despite <intref check="valid" refid="sec.155" target.guid="_1d474d73-40e7-41ac-90d2-5f23e74c581d">section 155</intref> or any provision of the non-owner lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1caa00a1-1602-42c5-beb5-91bd788922f6" id="sec.225-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Annual rent under <intref check="valid" refid="sec.155" target.guid="_1d474d73-40e7-41ac-90d2-5f23e74c581d">section 155</intref> for a non-owner lease is payable from granting of the lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_68a87f44-3a9a-4d9f-8bcb-0f81f7edb968" id="sec.225-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If, under <intref check="valid" refid="sec.224" target.guid="_dc49e772-03e1-4f80-b8eb-7582914b280a">section 224</intref>, the non-owner lease is cancelled the rent is still payable from the grant until it was cancelled.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_409e460f-542b-4719-8b27-aaf3eb2e082c" id="sec.226" provision.type="other" spent.amends="0"><no>226</no><heading guid="_97604aca-1ce1-44cb-9af8-34da2b9fa4f6" id="sec.226-he">State property in stored petroleum or prescribed storage gas in particular circumstances</heading><block><txt break.before="1">Any of the stored petroleum or prescribed gas that a current owner owns becomes the property of the State—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_95c3a8b5-e20b-40e5-8462-b110255e7cab" id="sec.226-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the current owner gives an ownership relinquishment notice for it; or</txt></block></li><li guid="_19b2ea62-eab0-4e86-8f72-9117478c9912" id="sec.226-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">on the fifth anniversary of the making of the decision under <intref check="valid" refid="sec.215" target.guid="_8ad230a2-3200-47f1-940a-690c22f3b974">section 215</intref>, unless, before that anniversary—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6455fffa-6dea-4d97-aa2e-cc6b88bee16c" id="sec.226-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a petroleum lease the area of which includes the reservoir is granted; and</txt></block></li><li guid="_75d835ce-4b72-4b79-bfa0-006dafcf866a" id="sec.226-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the lease takes effect.</txt></block></li></list></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_1a6e8d4f-a72d-4665-aa96-befdc8928a71" id="sec.227" provision.type="other" spent.amends="0"><no>227</no><heading guid="_0a302212-b28a-4b0a-ab59-4c1d8a2b1fc0" id="sec.227-he">Storage rent payable by current owner</heading><subclause affected.by.uncommenced="0" guid="_d35f77f7-50e0-4d5c-a27f-d87cbc9db33c" id="sec.227-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Each person who is a current owner of any of the stored petroleum or prescribed storage gas must pay the State rent for storing the stored petroleum or prescribed storage gas that the current owner owns from time to time.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2ab8f37c-b1c7-4896-86d7-89d9e359a12f" id="sec.227-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The rent is payable from when the person became the current owner of the stored petroleum or prescribed storage gas until the earlier of the following events to happen—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e4a079d8-c360-465a-9ccb-cbec42976b29" id="sec.227-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the person ceases to be the current owner of any of the stored petroleum or prescribed storage gas;</txt></block></li><li guid="_875a41a8-0266-4319-858f-dd45269f6726" id="sec.227-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the taking effect of a petroleum lease the area of which includes the reservoir;</txt></block></li><li guid="_dbea486f-17f0-46e2-bff9-648d58547c61" id="sec.227-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">under <intref check="valid" refid="sec.226" target.guid="_409e460f-542b-4719-8b27-aaf3eb2e082c">section 226</intref>, the stored petroleum or prescribed storage gas becomes the property of the State.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_4812cb8d-9b57-4a28-9e6d-002d14dc3c86" id="sec.227-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The rent must be paid at the rate and in the way prescribed under a regulation.</txt></block></subclause></clause></subdivision></division><division affected.by.uncommenced="0" guid="_67d7a231-f172-4068-8ce5-97a5137e1d48" id="ch.2-pt.6-div.4"><no>Division 4</no><heading guid="_398c41ad-25bf-4c7a-865b-8988dde79113" id="ch.2-pt.6-div.4-he">Regulatory provisions</heading><clause affected.by.uncommenced="0" guid="_6711051f-1098-4c0c-b996-b5b5e3691033" id="sec.228" provision.type="other" spent.amends="0"><no>228</no><heading guid="_a230c849-d63a-4051-80e0-2e51f1e9acf1" id="sec.228-he">Prohibition on actions preventing access</heading><subclause affected.by.uncommenced="0" guid="_31ccb24f-11d3-4314-a30d-2edc47cc0c15" id="sec.228-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not engage in conduct for the purpose of preventing someone else from obtaining the use of a natural underground reservoir with available storage capacity in the area of a petroleum lease for storage of petroleum or a prescribed storage gas.</txt></block><penalty guid="_58e7d92c-b928-4416-a9b1-e518bad34155" id="sec.228-ssec.1-pen"><block><txt break.before="1">Maximum penalty—1,000 penalty units.</txt></block></penalty><note guid="_3d66785e-09e8-4c17-82e3-a3405ff074df" id="sec.228-ssec.1-note" type="example"><heading guid="_580312f4-531e-4b20-aad6-6aacf7f33391" id="sec.228-ssec.1-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_6110748f-303b-44b5-8d97-88f13cd3474a" id="sec.228-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.228-ssec.1" target.guid="_31ccb24f-11d3-4314-a30d-2edc47cc0c15">subsection (1)</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fb3a1258-4db5-4077-bab1-d8b90878655d" id="sec.228-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a person engages in conduct for a particular purpose if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_03ce7687-27c1-4bcf-b90c-5f7d43395689" id="sec.228-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the conduct is or was engaged in for the purpose or for a purpose including the purpose; and</txt></block></li><li guid="_477772f4-35be-470f-891d-a403980a3cbd" id="sec.228-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the purpose is or was not an incidental or unintended consequence of the conduct engaged in; and</txt></block></li></list></block></li><li guid="_66a4729f-a285-406b-87bc-3644ab94d28c" id="sec.228-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a person may be found to have engaged in conduct for a purpose even though, after all the evidence has been considered, the existence of the purpose is ascertainable only by inference from the conduct of the person or of someone else or from other relevant circumstances.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f0be2034-8d45-4f8c-955c-5c930b854c1c" id="sec.228-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0"><intref check="valid" refid="sec.228-ssec.2" target.guid="_6110748f-303b-44b5-8d97-88f13cd3474a">Subsection (2)</intref><intref check="valid" refid="sec.228-ssec.2-para1.b" target.guid="_66a4729f-a285-406b-87bc-3644ab94d28c">(b)</intref> does not limit the way the purpose of a person may be established for <intref check="valid" refid="sec.228-ssec.1" target.guid="_31ccb24f-11d3-4314-a30d-2edc47cc0c15">subsection (1)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9d3d856b-ffb7-44ff-9137-d35bb34e3c1e" id="sec.228-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_8beb5493-f4d8-4739-b415-cca457865332" id="sec.228-ssec.4-def.engage_"><txt break.before="1"><defterm guid="_19ccd376-a93d-455f-b125-002b2d792da6" id="sec.228-ssec.4-def.engage" type="definition">engage</defterm>, in conduct, means doing, or refusing to do, an act.</txt><note guid="_fbad0196-8020-4045-934e-5b57662e3afa" id="sec.228-ssec.4-def.engage-note" type="example"><heading guid="_be866953-61de-41ad-ad92-ee8064c0ed4b" id="sec.228-ssec.4-def.engage-note-he">Examples of engaging in conduct—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_c19fc956-dbe8-4cc2-9b6f-6369a4470ac4" id="sec.228-ssec.4-def.engage-note-para1" provision.type="other"><no>•</no><block><txt break.before="0">refusing to supply a service</txt></block></li><li guid="_f53d1908-781e-4551-bc42-abaa9f4b4968" id="sec.228-ssec.4-def.engage-note-para1-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">without reasonable grounds, limiting or disrupting a service</txt></block></li><li guid="_860e242d-2077-4ded-95e1-1d0204167218" id="sec.228-ssec.4-def.engage-note-para1-oc.3" provision.type="other"><no>•</no><block><txt break.before="0">making, or giving effect to, a provision of an understanding</txt></block></li><li guid="_0c5f257c-e563-4d74-8630-310422606d66" id="sec.228-ssec.4-def.engage-note-para1-oc.4" provision.type="other"><no>•</no><block><txt break.before="0">requiring the giving of, or giving, a covenant</txt></block></li></list></block></note></definition><definition affected.by.uncommenced="0" guid="_dcf7b15c-3492-4863-80c4-a499d1a5368d" id="sec.228-ssec.4-def.refusingtodo_"><txt break.before="1"><defterm guid="_76fd2af0-a5af-490b-80e1-f925302ea475" id="sec.228-ssec.4-def.refusingtodo" type="definition">refusing to do</defterm>, an act, includes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8dba79f0-149f-4177-8de4-aae8d519adcb" id="sec.228-ssec.4-def.refusingtodo-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">refraining, other than inadvertently, from doing the act; or</txt></block></li><li guid="_0ec59c17-d1e5-4671-818d-90d3f26a3c1b" id="sec.228-ssec.4-def.refusingtodo-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">making it known the act will not be done.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_630cf1aa-9afd-4ce0-80b8-0947cdfadd60" id="sec.229" provision.type="other" spent.amends="0"><no>229</no><heading guid="_5f165637-1514-4e80-b4ec-b1701db12a3b" id="sec.229-he">Orders to enforce prohibition on preventing access</heading><subclause affected.by.uncommenced="0" guid="_e5c75806-26a2-4f95-be21-6c4622d2eedf" id="sec.229-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, on application of a person, the District Court is satisfied someone else (the <defterm guid="_e45c5293-f5da-4729-a902-e00a59f8e9c9" id="sec.229-def.obstructor" type="definition">obstructor</defterm>) has engaged, is engaging, or proposes to engage, in conduct contrary to <intref check="valid" refid="sec.228" target.guid="_6711051f-1098-4c0c-b996-b5b5e3691033">section 228</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d65f42d7-8d0a-40d9-bafa-5dd1680a64ab" id="sec.229-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The court may make all or any of the following orders—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cafa65a1-b41f-4e9b-9765-61c6475af194" id="sec.229-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an order granting an injunction, on terms the court considers appropriate—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f6432521-311a-4408-bc27-24a10da2ebc6" id="sec.229-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">restraining the obstructor from engaging in the conduct; or</txt></block></li><li guid="_12bdcf75-9600-47fd-af53-bf96fc88cb57" id="sec.229-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the conduct involves failing to do something—requiring the obstructor to do the thing;</txt></block></li></list></block></li><li guid="_cbe45ffd-d7fb-4223-9dfe-a5a9e816cf66" id="sec.229-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an order directing the obstructor to compensate a person for loss or damage suffered by the person because of the conduct;</txt></block></li><li guid="_8ce0f793-6979-4a77-b860-5442a5c2cd8e" id="sec.229-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">another order the court considers appropriate.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5ef32c72-349f-4f3d-910e-7ab20bc1d932" id="sec.229-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The court may make any other order, including an injunction, it considers appropriate against another person involved in the conduct.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8d056616-499d-461c-88c5-2e9f89a85b06" id="sec.229-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The grounds on which the court may decide not to make an order under this section include the ground that this part or a relevant storage agreement provides a more appropriate way of dealing with the issue.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_bc55cf83-bf8a-4657-a20b-01990f13f440" id="ch.2-pt.7"><no>Part 7</no><heading guid="_335af6de-197f-427d-8d61-837952a0dca9" id="ch.2-pt.7-he">Commercial viability assessment</heading><clause affected.by.uncommenced="0" guid="_56d22cd4-53a3-4c93-8714-633209c67ae4" id="sec.230" provision.type="other" spent.amends="0"><no>230</no><heading guid="_7cdbaf0c-cb59-4645-b34a-230cf1a55c1e" id="sec.230-he">Minister’s power to require commercial viability report</heading><subclause affected.by.uncommenced="0" guid="_7223722e-68af-41cf-848e-5a756b3dea6e" id="sec.230-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may, by notice (a <defterm guid="_c14777f4-6c36-45ec-aa76-1df1b1381157" id="sec.230-def.reportrequirement" type="definition">report requirement</defterm>), require a petroleum tenure holder to lodge a written report (a <defterm guid="_8eba7bc4-94d9-4ba8-87a8-99797a062ef4" id="sec.230-def.commercialviabilityreport" type="definition">commercial viability report</defterm>) about all or a stated part of its area if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_01abd8c8-2fca-4bc0-b77e-994adf5e48b5" id="sec.230-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the holder is not producing petroleum in the area or stated part; and</txt></block></li><li guid="_c4dab262-c48f-48ba-af9c-638515118971" id="sec.230-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Minister is of the opinion that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c6a36d18-0211-4576-b702-ce61d6e5b13a" id="sec.230-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">it may be commercially viable to produce or store petroleum in the area or stated part; or</txt></block></li><li guid="_67ceac58-d041-4d41-86a2-9d7ddf0a26eb" id="sec.230-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">it may, within the next 15 years, be commercially viable to produce or store petroleum in the area or stated part.</txt><note guid="_2812c39c-3f32-4a6b-a0b4-ebc7c367c9cb" id="sec.230-ssec.1-para1.b-para2.ii-note" type="example"><heading guid="_36cfb51a-8d24-4a02-8ac0-6d05d7ec12bc" id="sec.230-ssec.1-para1.b-para2.ii-note-he">Note—</heading><block><txt break.before="1">For the relevance of this period, see <intref check="valid" refid="ch.2-pt.1" target.guid="_ae224c28-0e3b-4475-a663-d926bb3b8358">part 1</intref>, <intref check="valid" refid="ch.2-pt.1-div.6" target.guid="_3f379027-68a0-4585-ba5f-a690caaa366d">division 6</intref>.</txt></block></note></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e4d40143-3906-40e0-869d-9b3483d1eedc" id="sec.230-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must state each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9d1a3b00-d7ac-45ed-acd6-97c177fa64d7" id="sec.230-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the Minister’s opinion under <intref check="valid" refid="sec.230-ssec.1" target.guid="_7223722e-68af-41cf-848e-5a756b3dea6e">subsection (1)</intref><intref check="valid" refid="sec.230-ssec.1-para1.b" target.guid="_c4dab262-c48f-48ba-af9c-638515118971">(b)</intref><intref check="valid" refid="sec.230-ssec.1-para1.b-para2.i" target.guid="_c6a36d18-0211-4576-b702-ce61d6e5b13a">(i)</intref> or <intref check="valid" refid="sec.230-ssec.1-para1.b-para2.ii" target.guid="_67ceac58-d041-4d41-86a2-9d7ddf0a26eb">(ii)</intref>;</txt></block></li><li guid="_0cfb735b-2925-4495-8620-8080780040d4" id="sec.230-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the facts and circumstances forming the basis for the opinion;</txt></block></li><li guid="_6572d13e-df20-4233-807f-b9d516acca81" id="sec.230-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that the Minister requires the holder to give the Minister a commercial viability report about the area;</txt></block></li><li guid="_1dda17e2-8353-4f82-827e-73a78aec6885" id="sec.230-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a reasonable period for giving the report.</txt></block></li></list><note guid="_a0901c16-eb18-4c7c-8f09-bdb1a784c374" id="sec.230-ssec.2-note" type="example"><heading guid="_8bc6f0a0-f24b-4037-a943-da44b915319d" id="sec.230-ssec.2-note-he">Note—</heading><block><txt break.before="1">For other relevant provisions about giving a document to the Minister, see <intref check="valid" refid="sec.851AA" target.guid="_1bb215c0-29c7-436b-85d1-d8220a60416c">section 851AA</intref>.</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_38d7e9f3-53ac-433c-b4bb-b6410704f8b9" id="sec.231" provision.type="other" spent.amends="0"><no>231</no><heading guid="_07e4c107-4324-4277-a718-96695019df6f" id="sec.231-he">Required content of commercial viability report</heading><subclause affected.by.uncommenced="0" guid="_fb024f91-e9bb-4a08-934a-c697bd83f783" id="sec.231-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A commercial viability report must do all of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bd696a18-8eba-4eeb-8674-01b523249179" id="sec.231-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">identify each natural underground reservoir in the area the subject of the relevant report requirement;</txt></block></li><li guid="_53f1f123-5dff-4148-9f2a-de7e0a4a4cd2" id="sec.231-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give an estimate of the amount of petroleum in each reservoir;</txt></block></li><li guid="_9d5edffe-ea8a-40da-8620-d3622bc69744" id="sec.231-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">state the standards and procedures used to make the estimate;</txt></block></li><li guid="_e16e46c8-4fce-42b6-8830-cc11324d55a1" id="sec.231-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">state whether, in the opinion of the relevant petroleum tenure holder, it is commercially viable to produce or store petroleum in the area;</txt></block></li><li guid="_c3dd4155-50d9-4693-a191-f7547c602fb5" id="sec.231-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">if the holder’s opinion is that it is not commercially viable to produce or store petroleum in the area—state whether, in the holder’s opinion, it will, within the next 15 years, be commercially viable to produce or store petroleum in the area;</txt></block></li><li guid="_c9325836-6fe4-405c-9d97-d9a0a05fd6a9" id="sec.231-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">give data, and an analysis of the data, that supports each opinion.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3003e5e2-b14f-481c-9c51-268c8c00b69e" id="sec.231-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The supporting data and analysis must include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9dad21a8-c763-48d1-a4fe-30ea1a131184" id="sec.231-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">technical data relating to the geology of, and natural underground reservoirs in the area; and</txt></block></li><li guid="_4d75cf0d-3c13-41de-be62-73b6a221d160" id="sec.231-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">market and financial data relevant to the opinions.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1cb5b534-8acb-4a00-90d9-f9f24fc6d522" id="sec.232" provision.type="other" spent.amends="0"><no>232</no><heading guid="_1752a4e5-ca89-4e26-950f-ac038c1e8855" id="sec.232-he">Minister’s power to obtain independent viability assessment</heading><subclause affected.by.uncommenced="0" guid="_27583d10-a12e-47fc-8d5b-fb6aa3ad320f" id="sec.232-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies for a petroleum tenure, whether or not its holder has lodged a commercial viability report about the tenure.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ae00ae80-27fa-44a4-84d0-8576e7506f09" id="sec.232-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister may obtain an independent assessment of the commercial viability of petroleum production or storage in all or part of the area of the tenure (an <defterm guid="_8ed5ef4c-08f4-4061-bb12-1efbc2040306" id="sec.232-def.independentviabilityassessment" type="definition">independent viability assessment</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_508fd982-0874-46d9-9ee9-d8a9868dad06" id="sec.232-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, before seeking the assessment, the Minister must give the holder a notice stating each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1e0cabd2-d979-4ba1-9c6c-a9a41ded4d46" id="sec.232-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that the Minister proposes to obtain the assessment;</txt></block></li><li guid="_e2cb7ac9-489a-4bde-9f33-cca0d385dc6b" id="sec.232-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Minister’s reasons for seeking the assessment;</txt></block></li><li guid="_27ca95ad-1149-4faa-a86c-c9c710b0b5aa" id="sec.232-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the likely costs of obtaining the assessment;</txt></block></li><li guid="_87debf51-5db1-4487-89ab-947c8981d16a" id="sec.232-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">whether the State will, under <intref check="valid" refid="sec.233" target.guid="_07fa7cd5-dcc7-4751-b1f2-a8a06d4f9307">section 233</intref>, seek to recover the costs;</txt></block></li><li guid="_8a24367f-e905-4fba-9369-f9c597271fd9" id="sec.232-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">that the holder may, within a stated reasonable period, lodge submissions about the proposed assessment.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e6fa202e-fd2c-47a8-bc81-68b72c3ab7d2" id="sec.232-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Any submissions lodged by the holder within the stated period must be considered.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9a90e425-4014-4aef-b4f3-39282b87bb23" id="sec.232-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The Minister must after receiving the assessment, give the holder a copy.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_07fa7cd5-dcc7-4751-b1f2-a8a06d4f9307" id="sec.233" provision.type="other" spent.amends="0"><no>233</no><heading guid="_16fde70f-f3ab-47ad-a78e-fe227b26f7df" id="sec.233-he">Costs of independent viability assessment</heading><block><txt break.before="1">If—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d680100b-4586-442d-a7c2-fa3b6a527f9d" id="sec.233-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the Minister has incurred costs in obtaining, under <intref check="valid" refid="sec.232" target.guid="_1cb5b534-8acb-4a00-90d9-f9f24fc6d522">section 232</intref>, an independent viability assessment about a petroleum tenure; and</txt></block></li><li guid="_e6882438-7f1c-40c2-b407-85d4a0dc4128" id="sec.233-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the notice under <intref check="valid" refid="sec.232" target.guid="_1cb5b534-8acb-4a00-90d9-f9f24fc6d522">section 232</intref> about the assessment stated that the State will seek to recover the costs; and</txt></block></li><li guid="_1871008d-84c1-4bf3-b49b-4b11e299fcfd" id="sec.233-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the Minister has given the petroleum tenure holder a notice requiring the holder to pay a reasonable amount for the costs;</txt></block></li></list></block><block><txt break.before="1">the holder must pay the State a reasonable amount for the costs.</txt></block></clause></part><part affected.by.uncommenced="0" guid="_286032e7-1db3-499a-b6fd-867e46143006" id="ch.2-pt.8"><no>Part 8</no><heading guid="_17235995-5e42-44fa-b254-abcb6886301c" id="ch.2-pt.8-he">Petroleum activities coordination</heading><clause affected.by.uncommenced="0" guid="_833f730f-e87f-4f59-9210-6dce92c940d2" id="sec.234" provision.type="other" spent.amends="0"><no>234</no><heading guid="_bc1499ad-0aec-49c9-8b50-79ea9be2e6c8" id="sec.234-he">Arrangement to coordinate petroleum activities</heading><subclause affected.by.uncommenced="0" guid="_cb5ae2df-d0dc-40ca-b283-59ffa796127b" id="sec.234-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The following persons may make an arrangement about a matter mentioned in <intref check="valid" refid="sec.234-ssec.2" target.guid="_3781336c-e2f9-4f7d-96ce-aee08c306c54">subsection (2)</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5740a7f8-4c64-42bc-aa50-2d5a084347c4" id="sec.234-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the holder of a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease;</txt></block></li><li guid="_414f3c1a-8f50-488b-8e46-7762484f3c2d" id="sec.234-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the applicant for, or the holder of, a petroleum lease;</txt></block></li><li guid="_3c8eb2bf-1755-43d6-b8b6-d24ccb04dcba" id="sec.234-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the applicant for, or the holder of, a mining lease.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3781336c-e2f9-4f7d-96ce-aee08c306c54" id="sec.234-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.234-ssec.1" target.guid="_cb5ae2df-d0dc-40ca-b283-59ffa796127b">subsection (1)</intref>, the matters are—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_75617b39-900d-46ca-9cd2-3e19acce9779" id="sec.234-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the orderly—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8bda92a3-2ad5-486d-8d0c-974dcb792328" id="sec.234-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">production of petroleum from a natural underground reservoir under more than 1 of the leases; or</txt></block></li><li guid="_136e598d-3836-4726-b685-b0e0243f0a74" id="sec.234-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">carrying out of an authorised activity for any of the leases by any party to the arrangement; and</txt></block></li></list></block></li><li guid="_e074bab7-7675-46de-807d-6ce1fcd5dd56" id="sec.234-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">petroleum production from more than 1 natural underground reservoir under more than 1 of the leases.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9dc44e10-1c17-4fe1-8838-7004123e81ca" id="sec.234-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The arrangement may—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4d9c29be-9f07-4fee-9956-1c5fe6679638" id="sec.234-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be for any term; and</txt></block></li><li guid="_0150be68-89ef-4b69-9f1e-a991fd4ef0b5" id="sec.234-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if each holder of a relevant mining or petroleum lease agrees, provide for a matter that is inconsistent with, to the extent mentioned in <intref check="valid" refid="sec.234-ssec.3A" target.guid="_17307ad4-e8eb-4947-8507-bc91fca3c14c">subsection (3A)</intref>, or not provided for under the leases or their conditions; and</txt></block></li><li guid="_b270924d-6271-47fb-b7af-671302528052" id="sec.234-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">provide for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cefa6319-7389-4069-8a87-88b3bf5b4fe2" id="sec.234-ssec.3-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the subleasing of, or of an interest in, a relevant petroleum lease to a party to the arrangement or someone else; and</txt></block></li><li guid="_3b478985-8fab-44ff-bd78-8ed45c05d84c" id="sec.234-ssec.3-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a party to the arrangement to be granted a pipeline licence to transport petroleum or a prescribed storage gas on land subject to the arrangement.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_17307ad4-e8eb-4947-8507-bc91fca3c14c" id="sec.234-ssec.3A" provision.type="other"><no>(3A)</no><block><txt break.before="0">For <intref check="valid" refid="sec.234-ssec.3" target.guid="_9dc44e10-1c17-4fe1-8838-7004123e81ca">subsection (3)</intref><intref check="valid" refid="sec.234-ssec.3-para1.b" target.guid="_0150be68-89ef-4b69-9f1e-a991fd4ef0b5">(b)</intref>, the arrangement may only be inconsistent with 1 or more of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_42cb1d6c-e52d-4032-ab0d-3d8d7f2bac56" id="sec.234-ssec.3A-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">when a petroleum lease holder must start petroleum production under <intref check="valid" refid="sec.154" target.guid="_480bb62b-8b18-47ac-9d79-897b1c68b4b0">section 154</intref><intref check="valid" refid="sec.154-ssec.1" target.guid="_7cd03659-77bc-4301-9f03-3a9113ecabfa">(1)</intref>;</txt></block></li><li guid="_6dc6980d-69cd-415c-b140-535ed37ceb06" id="sec.234-ssec.3A-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the development plan or the proposed development plan for a lease mentioned in <intref check="valid" refid="sec.234-ssec.1" target.guid="_cb5ae2df-d0dc-40ca-b283-59ffa796127b">subsection (1)</intref>;</txt></block></li><li guid="_8eaa2571-5ee4-4734-88ed-1e24abac334b" id="sec.234-ssec.3A-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the conditions of the lease imposed under—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3d74a87e-b304-4a7c-929d-0b2f7fa7a182" id="sec.234-ssec.3A-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.44" target.doc.id="act-1923-026" target.guid="_56a3b9d5-4b74-4a75-b5d3-305d510e5d15" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act">section 44</legref><legref check="invalid" jurisd="QLD" type="act">(1)</legref><legref check="invalid" jurisd="QLD" refid="sec.44-ssec.1-para1.d" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act">(d)</legref>; or</txt></block></li><li guid="_76b9691c-51d2-45b8-8a78-d38486ee3fc3" id="sec.234-ssec.3A-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0"><intref check="valid" refid="sec.123" target.guid="_ef44ece4-3399-4e95-8180-52c9dbb8d1b6">section 123</intref><intref check="valid" refid="sec.123-ssec.3" target.guid="_b5ebfb94-60a1-44eb-aa8e-7e01c9b61fed">(3)</intref>; or</txt></block></li><li guid="_9ddf993a-703f-422a-acbd-b140fc4bada4" id="sec.234-ssec.3A-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.276" target.doc.id="act-1989-110" target.guid="_ce4ea1a1-00f9-4a20-9d3f-06867f70cf93" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 276</legref><legref check="invalid" jurisd="QLD" type="act">(1)</legref><legref check="invalid" jurisd="QLD" type="act">(m)</legref> or <legref check="valid" jurisd="QLD" refid="sec.276" target.doc.id="act-1989-110" target.guid="_ce4ea1a1-00f9-4a20-9d3f-06867f70cf93" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">276</legref><legref check="invalid" jurisd="QLD" type="act">(3)</legref>.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_bfd07eb9-44d0-4923-96c8-c99edad87df4" id="sec.234-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A person other than the holder, or proposed holder, of a coordinated lease may also be a party to a coordination arrangement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3a407ba0-fa24-4991-b10f-9cff91e8bddf" id="sec.234-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">A coordination arrangement has no effect unless it is approved by the Minister under <intref check="valid" refid="sec.236" target.guid="_da492eff-cedb-409e-80b0-b0942ccef9b8">section 236</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a4acac82-8243-4379-9620-3df3765bdb66" id="sec.234-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_283f3005-75d1-45d1-81d8-7e0852ef541d" id="sec.234-ssec.6-def.authorisedactivity_"><txt break.before="1"><defterm guid="_27efd24b-9530-4080-a631-11d05fbad287" id="sec.234-ssec.6-def.authorisedactivity" type="definition">authorised activity</defterm>, for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f4be5804-be95-408e-b2e7-2c366c2210b0" id="sec.234-ssec.6-def.authorisedactivity-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a mining lease, means an activity that, under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, is an authorised activity for the lease; or</txt></block></li><li guid="_8a13fc20-86d6-4357-bdcc-1c2e3b4152c5" id="sec.234-ssec.6-def.authorisedactivity-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease, means an activity that, under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>, is an authorised activity for the lease.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_72089f3d-9cbe-45e0-9c22-3faf9be9e916" id="sec.234-ssec.6-def.coordinatedlease_"><txt break.before="1"><defterm guid="_53db2d96-86b1-47b4-9ed7-68d09971df03" id="sec.234-ssec.6-def.coordinatedlease" type="definition">coordinated lease</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d37fbfee-54ee-4ab8-9cc9-266de6530ce9" id="sec.234-ssec.6-def.coordinatedlease-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">2 or more petroleum leases; or</txt></block></li><li guid="_1a112679-aa43-4868-b70a-097c23890abd" id="sec.234-ssec.6-def.coordinatedlease-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">2 or more <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> leases; or</txt></block></li><li guid="_c5194630-37a6-462f-a3bc-5673d12dc47c" id="sec.234-ssec.6-def.coordinatedlease-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">1 or more petroleum leases and 1 or more <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> leases, in any combination; or</txt></block></li><li guid="_12030af9-befc-4195-ac5c-b6ddf9962ec3" id="sec.234-ssec.6-def.coordinatedlease-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">1 or more mining lease and 1 or more petroleum leases or <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> leases, in any combination.</txt><note guid="_c59aa895-5768-4bb3-8389-49fbe39d115d" id="sec.234-ssec.6-def.coordinatedlease-para1.d-note" type="example"><heading guid="_198c8287-8ce8-492a-aca6-ec6a2f53c32c" id="sec.234-ssec.6-def.coordinatedlease-para1.d-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_fe03bfe4-8ecf-4f54-8b9f-65718be74394" id="sec.234-ssec.6-def.coordinatedlease-para1.d-note-para2.1" provision.type="other"><no>1</no><block><txt break.before="0">Under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, a coal or oil shale mining lease holder has a limited entitlement to mine and use incidental coal seam gas, which is <defterm guid="_02a8a58f-b24d-44b3-99ad-999cf136deaa" type="mention">petroleum</defterm>. See <intref check="valid" refid="sec.10" target.guid="_72045839-9d2e-419b-8103-da2e9f726b64">section 10</intref> of this Act and the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.8" target.doc.id="act-1989-110" target.guid="_6ec7482d-90fc-40bc-9086-d5a2470454fe" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">chapter 8</legref>, <legref check="valid" jurisd="QLD" refid="ch.8-pt.8" target.doc.id="act-1989-110" target.guid="_8a65b945-a1f0-4bcf-bfc9-bbf1ced45fb5" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">part 8</legref>, <legref check="invalid" jurisd="QLD" type="act">division 1</legref>.</txt></block></li><li guid="_462ddff8-d44c-49af-b445-3116c468485f" id="sec.234-ssec.6-def.coordinatedlease-para1.d-note-para2.2" provision.type="other"><no>2</no><block><txt break.before="0">A coordination arrangement may provide for mining or production from coextensive natural underground reservoirs. See <intref check="valid" refid="sec.114" target.guid="_77d44076-98f2-49ce-8f51-bbea9a6a675e">section 114</intref> and the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.318CQ" target.doc.id="act-1989-110" target.guid="_e5b3e1a0-2109-40ec-9b32-a7ac59c3a243" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 318CQ</legref>.</txt></block></li></list></block></note></block></li></list></definition><definition affected.by.uncommenced="0" guid="_46769421-52a9-4fb1-9534-b2568afe8c73" id="sec.234-ssec.6-def.production_"><txt break.before="1"><defterm guid="_a5a1dd14-4f64-4dc9-bccb-aa99b7292b3d" id="sec.234-ssec.6-def.production" type="definition">production</defterm> includes mining, extraction, production or release carried out under a mining lease.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_931761e8-f737-4c43-9b1e-d7743343db18" id="sec.235" provision.type="other" spent.amends="0"><no>235</no><heading guid="_9b8e2513-7094-4b99-b543-7b68dbc7dc93" id="sec.235-he">Applying for ministerial approval of proposed coordination arrangement</heading><subclause affected.by.uncommenced="0" guid="_f2eeb0ee-10fd-4c99-bbc5-9456bf55d3fe" id="sec.235-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The parties to a proposed coordination arrangement may jointly apply for approval of the arrangement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ab3c76cb-1f2d-4294-a14e-48ccc02c59f4" id="sec.235-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application must be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_338ad202-abb5-4545-86a9-b4bb35ac3568" id="sec.235-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">written; and</txt></block></li><li guid="_881b560a-a8e5-4796-b15e-3f59ac63de9e" id="sec.235-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">accompanied by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0ed8b5bd-f443-4912-b0e7-c361c76c9057" id="sec.235-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the original or a certified copy of the proposed arrangement; and</txt></block></li><li guid="_8473fc13-405c-4605-8c02-185de51bf438" id="sec.235-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the fee prescribed under a regulation.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ab43cddc-ce33-44a1-b027-4e3bdcb36f0d" id="sec.235-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the proposed arrangement is inconsistent with the current development plan for a relevant lease, the application must be accompanied by a proposed later development plan for the lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f53dcffe-1031-428f-bed8-de87399a8887" id="sec.235-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the proposed plan is for a relevant mining lease, the plan must comply with the later development plan requirements under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>.</txt><note guid="_a35f320a-9ff5-4027-a417-2cf108a096f8" id="sec.235-ssec.4-note" type="example"><heading guid="_49d688e2-a8ea-407f-b7f2-f85b19ce3c9d" id="sec.235-ssec.4-note-he">Note—</heading><block><txt break.before="1">See the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.318ED" target.doc.id="act-1989-110" target.guid="_417691b0-6855-4544-bfc4-0e8393a42766" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 318ED</legref> (Later development plan requirements).</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_e15a4474-9f54-4ccd-93c2-e08db79de99a" id="sec.235-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the proposed plan is for a relevant <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease, the plan must comply with the later development plan requirements under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_da492eff-cedb-409e-80b0-b0942ccef9b8" id="sec.236" provision.type="other" spent.amends="0"><no>236</no><heading guid="_0332b836-552c-4ce7-a84a-a229f171d5ed" id="sec.236-he">Ministerial approval of proposed coordination arrangement</heading><subclause affected.by.uncommenced="0" guid="_284944f5-d797-4cea-a77c-fb734c0c4b81" id="sec.236-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may approve the proposed coordination arrangement only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a85e4d5d-41b8-4903-a9c9-b9e8b674ca61" id="sec.236-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the Minister is satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0547aab6-7c91-4029-bc50-d3a6706eb13e" id="sec.236-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the arrangement is in the public interest; and</txt></block></li><li guid="_7c5b8c3a-9050-43c8-bcda-aaa8116bed53" id="sec.236-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">any inconsistency between the arrangement and a condition of a relevant lease and any sublease provided for under the arrangement is appropriate; and</txt></block></li><li guid="_e45f250d-76de-4231-ba07-2ee27c4f2493" id="sec.236-ssec.1-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">if the arrangement applies to land that is in the area of a coal or oil shale mining tenement and in the area of a petroleum lease or <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease—the arrangement clearly identifies the safety responsibilities of each party to the arrangement in relation to the land; and</txt></block></li><li guid="_e7dba284-5f2e-4954-8b02-f8ca65ccf399" id="sec.236-ssec.1-para1.a-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">the spatial relationship between the relevant leases for the arrangement is appropriate.</txt></block></li></list></block></li><li guid="_4891f94d-9250-4463-a29a-12c779ad8a78" id="sec.236-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for an application required to be accompanied by a proposed later development plan for a relevant lease—the proposed plan has been approved; and</txt></block></li><li guid="_6052b6e3-8bd7-4b25-9388-a20241d7f016" id="sec.236-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the arrangement is consistent with—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5ec2998f-7eef-4b4a-864b-ab615a197866" id="sec.236-ssec.1-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the purpose of this Act; and</txt></block></li><li guid="_144d2d6b-9d57-4052-9016-ca5cf520fef9" id="sec.236-ssec.1-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if any relevant lease is a mining lease—the purposes of <intref check="valid" refid="ch.3" target.guid="_7d989cb7-da2a-4737-842c-bd1944dbb54e">chapter 3</intref> and the objectives of the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>.</txt><note guid="_f5b6ee23-815b-45e2-bcaf-6e11ffde3a6e" id="sec.236-ssec.1-para1.c-para2.ii-note" type="example"><heading guid="_44c2dca5-0252-4a98-b7a1-033139f27caf" id="sec.236-ssec.1-para1.c-para2.ii-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="sec.3" target.guid="_21eecc58-0404-4272-8373-06a31b838529">sections 3</intref> (Main purpose of Act) and <intref check="valid" refid="sec.295" target.guid="_41d6e624-c411-4710-99b8-18b498f675ff">295</intref> (Main purposes of ch 3) and the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.2" target.doc.id="act-1989-110" target.guid="_c75adc07-0466-40c8-93d7-219a6cc8f132" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 2</legref> (Objectives of Act).</txt></block></note></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_73df689c-8a7b-49b2-a2dd-16fa9b093872" id="sec.236-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Also, if the proposed plan is for a relevant <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease, the relevant provisions of that Act apply in relation to the proposed plan.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_71d65964-ccab-4a2a-9e73-cf459a60b0cb" id="sec.236-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister may refuse to approve a proposed coordination arrangement that provides for a party to the arrangement to be granted a pipeline licence to transport petroleum or a prescribed storage gas on land subject to the arrangement if the Minister considers that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_790c1c69-d296-433b-9a6f-75dbccbbbbb8" id="sec.236-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">having regard to the requirements under <intref check="valid" refid="ch.4" target.guid="_bce3f736-0a5e-4ba6-b741-c213b453c013">chapter 4</intref>, the pipeline licence would not be granted if the party were to apply for it; or</txt></block></li><li guid="_c0dfd47d-931f-46f4-9dbf-17a338fb7141" id="sec.236-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">not enough information has been given to decide whether the licence should be granted; or</txt></block></li><li guid="_4c5d59ce-70e6-4ebf-ab9b-5ec2cf058492" id="sec.236-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the spatial relationship between the leases is not appropriate for a coordination arrangement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c17f9114-69d7-4296-9556-2474f0c47f03" id="sec.236-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If a relevant lease has not been granted, the approval does not take effect until the lease takes effect.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_fd08231e-9558-45f6-b68f-49da0c2fd0c2" id="sec.237" provision.type="other" spent.amends="0"><no>237</no><heading guid="_120a4503-7315-46a6-982c-5dd5a3148781" id="sec.237-he">Approval does not confer right to renew</heading><block><txt break.before="1">To remove any doubt, it is declared that if the term of a coordination arrangement is longer than the current term of any relevant lease, the approval of the arrangement does not impose an obligation or right to renew the lease.</txt></block></clause><clause affected.by.uncommenced="0" guid="_614b48c3-6ae7-4f6f-8a92-88bb2713852b" id="sec.238" provision.type="other" spent.amends="0"><no>238</no><heading guid="_71b844ab-ad52-4a1f-87b9-d8b41b886b94" id="sec.238-he">Subleasing of <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease provided for under coordination arrangement</heading><block><txt break.before="1">On the approval of a coordination arrangement that provides for the subleasing of a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease, the sublease is taken to be a prescribed dealing <del xml:space="preserve">with approval from</del><ins xml:space="preserve">approved by</ins> the Minister<del xml:space="preserve"> for registration</del> under the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>.</txt></block></clause><clause affected.by.uncommenced="0" guid="_b46a1dd4-f56f-45f1-8398-76293aeff39e" id="sec.239" provision.type="other" spent.amends="0"><no>239</no><heading guid="_eafa71ba-dee0-4398-8a6f-096d436250ce" id="sec.239-he">Coordination arrangement overrides relevant leases</heading><subclause affected.by.uncommenced="0" guid="_939332f8-f366-4c1f-8512-b1de86027ab0" id="sec.239-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if there is a conflict between a coordination arrangement and a condition of a relevant lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_77636333-cd32-4129-a3f1-46a188fb1001" id="sec.239-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The arrangement prevails to the extent of the inconsistency.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2c534b7b-202c-44d3-9ef9-90d6d8790492" id="sec.239-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If a relevant lease holder has complied with the arrangement, the holder is taken to have complied with the condition to the extent that it is inconsistent with the arrangement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_07791c48-4124-4508-976e-dc1ce2c40753" id="sec.239-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">This section applies despite another provision of this Act, the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> or the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e450c43c-78df-44f1-9f8e-8bbcfcd85fba" id="sec.240" provision.type="other" spent.amends="0"><no>240</no><heading guid="_67be2bdb-fce9-43c9-b2d8-3639f2044503" id="sec.240-he">Grant of pipeline licence</heading><subclause affected.by.uncommenced="0" guid="_93bf5a10-308e-4069-8f9c-58a5b7ccd4fb" id="sec.240-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a coordination arrangement provides for a party to the arrangement to be granted a pipeline licence to transport petroleum or a prescribed storage gas on land subject to the arrangement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2441fb4a-f7cf-4add-803e-300600f9791e" id="sec.240-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister may, if the party applies under <intref check="valid" refid="ch.4" target.guid="_bce3f736-0a5e-4ba6-b741-c213b453c013">chapter 4</intref>, <intref check="valid" refid="ch.4-pt.2" target.guid="_e81c6ae8-4e20-4f0d-bb34-255aa2c54d7c">part 2</intref>, grant the pipeline licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c53a08ca-91f7-4362-9c41-d68dd0628751" id="sec.240-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0"><intref check="valid" refid="sec.412" target.guid="_4254ee96-45e5-4851-882e-f6dbec58a009">Section 412</intref> applies as if the application were a pipeline licence application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a0de42dd-e1fd-4a10-8d54-ee6aa690bd8f" id="sec.240-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, the provisions of the licence must be consistent with the arrangement.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_eaee7cd6-7ef9-49cc-b8d3-70511778612f" id="sec.241" provision.type="other" spent.amends="0"><no>241</no><heading guid="_cee12f8f-4d5b-46a3-94c0-41185219b3e8" id="sec.241-he">Amendment or cancellation by parties to arrangement</heading><subclause affected.by.uncommenced="0" guid="_d14b3f89-81bd-4d3d-a1c1-fadfe7b54707" id="sec.241-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A coordination arrangement may be amended or cancelled by the parties to the arrangement only with the Minister’s approval.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_639652f1-ac11-4778-9ac5-ac5af8408b86" id="sec.241-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A purported amendment or cancellation of a coordination arrangement by the parties to it has no effect unless it complies with <intref check="valid" refid="sec.241-ssec.1" target.guid="_d14b3f89-81bd-4d3d-a1c1-fadfe7b54707">subsection (1)</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2fd2c4e8-39fb-4d27-8a3f-72711cbca0be" id="sec.242" provision.type="other" spent.amends="0"><no>242</no><heading guid="_f229192f-5a46-4308-b865-411aeb8c73bc" id="sec.242-he">Minister’s power to cancel arrangement</heading><subclause affected.by.uncommenced="0" guid="_7c7dba4f-3166-4663-92e6-368eedac6ca6" id="sec.242-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may, by complying with <intref check="valid" refid="sec.242-ssec.2" target.guid="_bb416287-893b-49f9-9f24-958cded8fa3a">subsections (2)</intref> and <intref check="valid" refid="sec.242-ssec.3" target.guid="_0eef1ec2-750d-4afa-af62-ca24da678810">(3)</intref>, cancel a coordination arrangement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bb416287-893b-49f9-9f24-958cded8fa3a" id="sec.242-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the Minister proposes to cancel the arrangement, the Minister must give each holder of a relevant lease a notice stating—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f4333377-b07e-4e15-a976-6efbb6faecac" id="sec.242-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that the Minister proposes to cancel the arrangement; and</txt></block></li><li guid="_9a200ae8-8e5a-4a3c-a8fa-ffd0d65c9b82" id="sec.242-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">reasons for the proposed cancellation; and</txt></block></li><li guid="_31985f92-6c47-4ddd-bbe5-b88f23de6a67" id="sec.242-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that the holder may lodge submissions within the stated period about the proposed cancellation or the likely impact of the cancellation on the relevant leases.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0eef1ec2-750d-4afa-af62-ca24da678810" id="sec.242-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Before cancelling the arrangement, the following must be considered—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9a863c83-9fb9-4e19-8bbb-c6c70d0137c3" id="sec.242-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">any submissions lodged by the holder within the stated period;</txt></block></li><li guid="_3d02a568-997b-435c-9062-55c126dd93bc" id="sec.242-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the likely impact of the cancellation on the relevant leases;</txt></block></li><li guid="_d7141b52-a6ef-44a6-a4af-2c530dd0ea87" id="sec.242-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the public interest.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ed0c9b20-a947-4dfa-9b28-bae34ba8616f" id="sec.242-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If it is decided to cancel the arrangement, each of the holders must be given an information notice about the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d431ad34-fa16-4751-bae6-f8796f2b6b38" id="sec.242-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The cancellation takes effect on the end of the appeal period for the decision to cancel, or if a later day of effect is stated in the information notice, on that day.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_47c0b018-af12-4d4c-8c4d-0ae3fe1ec66e" id="sec.242-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">When the decision takes effect, the arrangement and the Minister’s approval of it cease to have effect.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a9d10d42-3af6-4edc-8e2e-618f796d55b5" id="sec.243" provision.type="other" spent.amends="0"><no>243</no><heading guid="_a503c4a7-290e-46b1-bd5e-13eca6bd2342" id="sec.243-he">Effect of cancellation</heading><subclause affected.by.uncommenced="0" guid="_6f64cdc1-8cf8-4bcc-bc71-6d068e0493ba" id="sec.243-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The cancellation of a former coordination arrangement does not affect any relevant lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e5f8cf37-5cfc-41a4-9d58-7fcdcfef5804" id="sec.243-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Any sublease of a petroleum lease or a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease provided for under the arrangement is cancelled.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_6f7f9284-5836-4486-b63b-35e219633886" id="ch.2-pt.10"><no>Part 10</no><heading guid="_6a09ff96-5851-44b5-b6ba-11cbc09ac687" id="ch.2-pt.10-he">General provisions for petroleum wells, water injection bores, water observation bores and water supply bores</heading><division affected.by.uncommenced="0" guid="_2ee46d8d-6062-4e20-b98a-d7c6f9c2a591" id="ch.2-pt.10-div.1"><no>Division 1</no><heading guid="_cb3e78a6-dbfd-48ac-aab4-b3f4257fb480" id="ch.2-pt.10-div.1-he">Restrictions on drilling</heading><clause affected.by.uncommenced="0" guid="_89c0646e-cdd3-4147-bd83-94905eefb0c7" id="sec.281" provision.type="other" spent.amends="0"><no>281</no><heading guid="_70edf7d1-1c0d-4a20-bbf7-02d7dd2d1e2f" id="sec.281-he">Requirements for drilling petroleum well</heading><subclause affected.by.uncommenced="0" guid="_605bf940-bb5b-472f-b4ef-3698ac4acb20" id="sec.281-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person drilling a petroleum well must comply with any requirements prescribed under a regulation that apply to the drilling of the well.</txt></block><penalty guid="_c34dad28-32db-48ba-aedb-e4428840b8bc" id="sec.281-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty><note guid="_938d37ca-176c-4f2f-80a1-3de680d94fa2" id="sec.281-ssec.1-note" type="example"><heading guid="_48a2a924-d474-4138-9e54-40220faebcb1" id="sec.281-ssec.1-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_d868ca13-2111-4f90-a4cf-9319fa4c460e" id="sec.281-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The requirements may include provisions to prevent the drilling adversely affecting the carrying out of safe and efficient mining or future mining of coal under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_6ddcb103-3b1d-4ab1-9067-cb649637d171" id="sec.282" provision.type="other" spent.amends="0"><no>282</no><heading guid="_9789afa5-2f39-4864-88ae-78eab9864b9b" id="sec.282-he">Restriction on who may drill water injection bore, water observation bore or water supply bore</heading><subclause affected.by.uncommenced="0" guid="_c5e64b41-81f2-42df-812d-a92c4ab2cff1" id="sec.282-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not drill a water injection bore, water observation bore or water supply bore unless the person is a licensed water bore driller.</txt></block><penalty guid="_f95b1dd8-4bca-4265-b6ea-d8dd38237d4d" id="sec.282-ssec.1-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_a0342a7d-05cf-43f1-9bf3-6a28a7a79123" id="sec.282-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, a petroleum tenure holder may drill a water injection bore, water observation bore or water supply bore in the area of the tenure if the holder complies with the requirements for drilling a water injection bore, water observation bore or water supply bore prescribed under a regulation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9ea90df8-8dc6-4d98-9a23-26c25d029973" id="sec.282-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, a water monitoring authority holder may drill a water injection bore or water observation bore in the area of the authority if the holder complies with the requirements for drilling a water injection bore or water observation bore prescribed under a regulation.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_2ae4e436-80cf-43d4-a803-680fcf39b045" id="ch.2-pt.10-div.2"><no>Division 2</no><heading guid="_d940f8c4-309e-4a71-a084-169862287bbe" id="ch.2-pt.10-div.2-he">Converting petroleum well to water injection bore, water observation bore or water supply bore</heading><clause affected.by.uncommenced="0" guid="_9503cbbf-9ff2-4f55-9339-e6b37cf94591" id="sec.282A" provision.type="other" spent.amends="0"><no>282A</no><heading guid="_43c5d252-818d-4c20-b249-07ea940ecf43" id="sec.282A-he">Application of <intref check="valid" refid="ch.2-pt.10-div.2" target.guid="_2ae4e436-80cf-43d4-a803-680fcf39b045">div 2</intref></heading><block><txt break.before="1">This division applies to a petroleum well in the area of a petroleum tenure that has been drilled as required under <intref check="valid" refid="sec.281" target.guid="_89c0646e-cdd3-4147-bd83-94905eefb0c7">section 281</intref>, or decommissioned under <intref check="valid" refid="sec.292" target.guid="_21940938-f87d-4dd6-9453-0c2e8fab326c">section 292</intref>, on or after 1 January 2012.</txt></block></clause><clause affected.by.uncommenced="0" guid="_647e9706-2b27-4784-b095-6bce86130bc5" id="sec.283" provision.type="other" spent.amends="0"><no>283</no><heading guid="_3074dd27-4789-441e-af70-799bac13f83f" id="sec.283-he">Restrictions on making conversion</heading><subclause affected.by.uncommenced="0" guid="_d63e7c74-4e0e-405b-8cbd-d7e97fdf2711" id="sec.283-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The petroleum tenure holder may convert the petroleum well to a water injection bore, water observation bore or water supply bore only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_185809c5-0aac-43f1-a414-140891c128be" id="sec.283-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the holder lodges—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2e228041-ce2c-44ac-b579-7396745aa695" id="sec.283-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a well completion report for the well; and</txt></block></li><li guid="_1b286ed6-d139-46aa-a5e0-3816649311c9" id="sec.283-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a notice in the approved form that the holder intends to convert the petroleum well to a water injection bore, water observation bore or water supply bore; and</txt></block></li></list></block></li><li guid="_8802d534-cd78-498a-9546-7dbfacafac89" id="sec.283-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder complies with requirements prescribed under a regulation for converting the petroleum well to a water injection bore, water observation bore or water supply bore.</txt></block></li></list></block><penalty guid="_8e320c22-3acb-4b7c-9e4a-6a805ddcd1be" id="sec.283-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_481f2f4b-0d0c-4453-bc91-314b58635fa3" id="sec.283-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The approved form must require the holder to state the day on which the petroleum well will be converted to a water injection bore, water observation bore or water supply bore.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4b9ecd01-44cc-4d29-9adf-7b7b4ed46895" id="sec.283-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_fe527cf7-bc94-46f6-9378-070cdfa9b34a" id="sec.283-ssec.3-def.wellcompletionreport_"><txt break.before="1"><defterm guid="_ba89c5a3-d6ea-4dfb-a2a4-de1d17f997da" id="sec.283-ssec.3-def.wellcompletionreport" type="definition">well completion report</defterm> means a well completion report that a regulation requires a petroleum tenure holder to lodge under <intref check="valid" refid="sec.553" target.guid="_aa8aa54c-46d5-4b59-a688-fae6b7998315">section 553</intref><intref check="valid" refid="sec.553-ssec.1" target.guid="_0efd614d-2536-4f41-a3eb-afa15576ccd9">(1)</intref><intref check="valid" refid="sec.553-ssec.1-para1.b" target.guid="_45498822-ed17-4ada-970d-8599d2d3af94">(b)</intref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_aea7f419-3501-4f38-850c-e863a3cbc61e" id="sec.284" provision.type="other" spent.amends="0"><no>284</no><heading guid="_0578d348-b34c-427f-8b9e-e539520afdb6" id="sec.284-he">Notice of conversion</heading><block><txt break.before="1">The petroleum tenure must, within 10 business days after the holder converts the well, lodge a notice stating the information prescribed under a regulation.</txt></block><penalty guid="_100af5c5-9482-4481-9612-cdba78f41df4" id="sec.284-pen"><block><txt break.before="1">Maximum penalty—50 penalty units.</txt></block></penalty></clause><clause affected.by.uncommenced="0" guid="_7ee903ec-588b-4d9b-b282-4528bb78e10b" id="sec.284A" provision.type="other" spent.amends="0"><no>284A</no><heading guid="_1f616e97-c23a-439f-b0b7-d14fd0d3e224" id="sec.284A-he">Time of conversion</heading><subclause affected.by.uncommenced="0" guid="_5c490b18-2137-4ea6-bc93-e321cd472efd" id="sec.284A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The petroleum well is taken to be converted to a water injection bore, water observation bore or water supply bore on the earlier of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_34fe756b-909c-43a9-a204-ce5b3d1efb64" id="sec.284A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the day stated in the approved form under <intref check="valid" refid="sec.283" target.guid="_647e9706-2b27-4784-b095-6bce86130bc5">section 283</intref>;</txt></block></li><li guid="_184ca5ae-2a88-498b-b553-df5a39671e55" id="sec.284A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the day the notice under <intref check="valid" refid="sec.284" target.guid="_aea7f419-3501-4f38-850c-e863a3cbc61e">section 284</intref> is lodged.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0d806b99-e5d6-4a81-8d98-959f9ca5efad" id="sec.284A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if the holder fails to give notice under <intref check="valid" refid="sec.283" target.guid="_647e9706-2b27-4784-b095-6bce86130bc5">sections 283</intref> and <intref check="valid" refid="sec.284" target.guid="_aea7f419-3501-4f38-850c-e863a3cbc61e">284</intref>, the petroleum well is taken to be converted to a water injection bore, water observation bore or water supply bore immediately after the well is converted.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_b1c2fbaa-a819-4abc-b800-38c31a636c67" id="ch.2-pt.10-div.3"><no>Division 3</no><heading guid="_6ae4e046-2bfe-41f3-8f78-bcf4ea5bf813" id="ch.2-pt.10-div.3-he">Transfers of petroleum wells, water injection bores, water observation bores and water supply bores</heading><subdivision affected.by.uncommenced="0" guid="_99aa77f8-280b-4a6e-aa56-8ef64b562140" id="ch.2-pt.10-div.3-sdiv.1"><no>Subdivision 1</no><heading guid="_c32d33a6-888a-454d-8f85-143c337eec54" id="ch.2-pt.10-div.3-sdiv.1-he">General provisions</heading><clause affected.by.uncommenced="0" guid="_546983c0-133b-467d-b31d-8892cc410a4c" id="sec.285" provision.type="other" spent.amends="0"><no>285</no><heading guid="_348e1058-27ad-4d64-9076-e14e8a7f56d8" id="sec.285-he">Operation of <intref check="valid" refid="ch.2-pt.10-div.3" target.guid="_b1c2fbaa-a819-4abc-b800-38c31a636c67">div 3</intref></heading><subclause affected.by.uncommenced="0" guid="_e0d7866e-fbf5-4bde-9f83-39acdf02bde3" id="sec.285-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This division permits, in particular circumstances, the transfer of the following in relation to a petroleum well, water injection bore, water observation bore or water supply bore—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4a794fe5-a3a9-4d0b-a947-5badbae924cc" id="sec.285-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the control of, and responsibility for, the well or bore;</txt></block></li><li guid="_2d6437ae-6623-4598-a629-41d457b2e17f" id="sec.285-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the ownership of any works constructed in connection with the well or bore.</txt><note guid="_02fbc3b8-df03-4639-919b-5eb52c828d83" id="sec.285-ssec.1-para1.b-note" type="example"><heading guid="_b46d9708-49d1-408a-94ea-7b00278f04ac" id="sec.285-ssec.1-para1.b-note-he">Note—</heading><block><txt break.before="1">For the ownership of works mentioned in <intref check="valid" refid="sec.285-ssec.1-para1.b" target.guid="_2d6437ae-6623-4598-a629-41d457b2e17f">paragraph (b)</intref> generally, see <intref check="valid" refid="sec.542" target.guid="_67ab1546-3583-4a9f-9c2e-1abd93e9559b">section 542</intref>.</txt></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_46903392-b1fb-49ae-962e-c6256ce5fae3" id="sec.285-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this division, a <defterm guid="_022fb5a9-2fcd-4e88-af65-820d3d68b63c" id="sec.285-def.transfer" type="definition">transfer</defterm> of a petroleum well, water injection bore, water observation bore or water supply bore is a reference to a transfer in relation to the well or bore mentioned in <intref check="valid" refid="sec.285-ssec.1" target.guid="_e0d7866e-fbf5-4bde-9f83-39acdf02bde3">subsection (1)</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_5ba7a0cb-7c44-4ab3-aa3c-c98f1cbde327" id="sec.286" provision.type="other" spent.amends="0"><no>286</no><heading guid="_b7515e64-2730-4ef0-84c6-2fc7601eacc3" id="sec.286-he">Transfer only permitted under <intref check="valid" refid="ch.2-pt.10-div.3" target.guid="_b1c2fbaa-a819-4abc-b800-38c31a636c67">div 3</intref></heading><block><txt break.before="1">A purported transfer of a petroleum well, water injection bore, water observation bore or water supply bore is of no effect unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2f13dbae-cb6a-47f9-9c26-acb163e02f86" id="sec.286-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the transfer is permitted under this division; and</txt></block></li><li guid="_07730109-a2f3-481b-af2a-c86cd36067c9" id="sec.286-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the requirements under this subdivision for making the transfer have been complied with.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_4ea0d218-e06f-4c8e-bb1b-b15ce67ffaa8" id="sec.287" provision.type="other" spent.amends="0"><no>287</no><heading guid="_ff5f7173-fe50-4b34-88f1-f9aa080838af" id="sec.287-he">Effect of transfer</heading><subclause affected.by.uncommenced="0" guid="_21ec559a-0286-47aa-8f52-bca8821cada0" id="sec.287-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a petroleum well, water injection bore, water observation bore or water supply bore is transferred under this division, any obligation the transferor had under this Act or another law in relation to the well or bore ceases.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_902b062c-4f17-414b-8085-3adc65a97d18" id="sec.287-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if the transferor is someone other than the State, <intref check="valid" refid="sec.287-ssec.1" target.guid="_21ec559a-0286-47aa-8f52-bca8821cada0">subsection (1)</intref> does not apply to the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act"><name emphasis="no">Environmental Protection Act</name></legref>.</txt><note guid="_2daa0c14-229f-42a3-a1f8-7ec1a91e9cd7" id="sec.287-ssec.2-note" type="example"><heading guid="_aa0ff009-b008-402d-bcb5-d722faf4602f" id="sec.287-ssec.2-note-he">Note—</heading><block><txt break.before="1">For transfers by the State, see <intref check="valid" refid="sec.294" target.guid="_b1326749-a36f-43d9-a9a7-e177045010d0">section 294</intref>.</txt></block></note></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_615e3a20-db97-4311-a936-fbd1722675b5" id="ch.2-pt.10-div.3-sdiv.2"><no>Subdivision 2</no><heading guid="_d6ec6411-fa1d-4dd9-865d-dd1c792e7daa" id="ch.2-pt.10-div.3-sdiv.2-he">Permitted transfers</heading><clause affected.by.uncommenced="0" guid="_f488a078-1654-4110-a6ea-4709e75ee7cc" id="sec.288" provision.type="other" spent.amends="0"><no>288</no><heading guid="_d27cf1cf-85d5-460c-b2a4-4564186bf0b7" id="sec.288-he">Transfer of water injection bore, water observation bore or water supply bore to landowner</heading><subclause affected.by.uncommenced="0" guid="_f86e4c0a-a648-4316-a3d3-ea2310f6e091" id="sec.288-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A petroleum tenure holder may, by complying with the requirements under <intref check="valid" refid="sec.288-ssec.3" target.guid="_989a807a-79be-4a13-90d0-949b90cb667d">subsection (3)</intref>, transfer a water injection bore, water observation bore or water supply bore in the area of the tenure to the landowner.</txt><note guid="_d7e4875b-3a02-4d15-b248-5cc94d4b91bc" id="sec.288-ssec.1-note" type="example"><heading guid="_2306eb34-3edd-4800-b9ac-12b91b592653" id="sec.288-ssec.1-note-he">Note—</heading><block><txt break.before="1">See also the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="yes">Water Act 2000</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.808" target.doc.id="act-2000-034" target.guid="_472adce7-d425-4e58-a52d-7ff9b203f95e" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act">section 808</legref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_92c58be4-eebd-4feb-8527-3b9741be7bf9" id="sec.288-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A water monitoring authority holder may, by complying with the requirements under <intref check="valid" refid="sec.288-ssec.3" target.guid="_989a807a-79be-4a13-90d0-949b90cb667d">subsection (3)</intref>, transfer a water injection bore or water observation bore in the area of the authority to the landowner.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_989a807a-79be-4a13-90d0-949b90cb667d" id="sec.288-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For <intref check="valid" refid="sec.288-ssec.1" target.guid="_f86e4c0a-a648-4316-a3d3-ea2310f6e091">subsections (1)</intref> and <intref check="valid" refid="sec.288-ssec.2" target.guid="_92c58be4-eebd-4feb-8527-3b9741be7bf9">(2)</intref>, the requirements are that each of the following have been lodged—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_83a8e5ed-7aae-4ad1-b5f6-4532d9ee66f1" id="sec.288-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a notice in the approved form;</txt></block></li><li guid="_14a0fa20-505f-4d3f-8173-1aa93e5c5011" id="sec.288-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the transfer fee prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c448c289-79f3-4def-9a9b-0ccd128d07df" id="sec.288-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The approved form must require—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d5c37ea0-7c2f-4474-83d9-dd9a6b60758e" id="sec.288-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a statement by the holder transferring the bore that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cdad8cd2-981b-4f6f-88a2-2fc9479422c9" id="sec.288-ssec.4-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">if the bore has been drilled under <intref check="valid" refid="sec.282" target.guid="_6ddcb103-3b1d-4ab1-9067-cb649637d171">section 282</intref>—<intref check="valid" refid="sec.282" target.guid="_6ddcb103-3b1d-4ab1-9067-cb649637d171">section 282</intref> has been complied with for the bore; or</txt></block></li><li guid="_faae3370-fa2f-4200-ac7e-ec3f4b83b0d5" id="sec.288-ssec.4-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the bore has been converted from a petroleum well under <intref check="valid" refid="sec.283" target.guid="_647e9706-2b27-4784-b095-6bce86130bc5">section 283</intref>—<intref check="valid" refid="sec.283" target.guid="_647e9706-2b27-4784-b095-6bce86130bc5">section 283</intref> has been complied with for the bore; and</txt></block></li></list></block></li><li guid="_d3d6501d-310a-4b82-8045-5a0c619b5e4d" id="sec.288-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the signed consent of the landowner to the transfer.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5f0e6101-9123-48e1-9cf5-99633a4092ea" id="sec.288-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_bcf99655-b1fc-44d3-9ca6-e3346c68a83d" id="sec.288-ssec.5-def.landowner_"><txt break.before="1"><defterm guid="_c2599d68-9e2f-4b97-8a67-8db866318ae6" id="sec.288-ssec.5-def.landowner" type="definition">landowner</defterm> means the owner of the land on which the bore is located.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f77f999c-7cca-4c10-9d4a-3f9aec8e29a2" id="sec.288A" provision.type="other" spent.amends="0"><no>288A</no><heading guid="_ea6cdd4b-64a7-4918-a386-e9bcc0f512cf" id="sec.288A-he">Transfer of water observation bore to State</heading><subclause affected.by.uncommenced="0" guid="_e6a93eec-e6ef-43b1-94cd-e3eb833a7d0d" id="sec.288A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A petroleum tenure holder or water monitoring authority holder may transfer a water observation bore in the area of the tenure or authority to the State if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c4faec6c-56b7-4683-801e-957a786cc394" id="sec.288A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the holder gives the chief executive a notice, in the approved form, offering to transfer the bore to the State; and</txt></block></li><li guid="_5eb4e286-83d2-451b-803a-6489b4bf987f" id="sec.288A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the chief executive receives the notice no later than 60 business days before the holder must, as required under <intref check="valid" refid="sec.292" target.guid="_21940938-f87d-4dd6-9453-0c2e8fab326c">section 292</intref>, decommission the bore; and</txt></block></li><li guid="_6fbb20f0-9699-4c40-b122-cde02ee2a888" id="sec.288A-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the chief executive, within 20 business days after receiving the notice, gives the holder notice that the State consents to the transfer.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_052c4260-942a-44e0-a95c-29f299b2fd98" id="sec.288A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The approved form must require a statement by the holder transferring the bore that, if the bore was drilled under <intref check="valid" refid="sec.282" target.guid="_6ddcb103-3b1d-4ab1-9067-cb649637d171">section 282</intref>, that section has been complied with for the bore.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_245b28bd-c225-4633-a972-fb2487704e80" id="sec.288A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the chief executive gives the holder a notice under <intref check="valid" refid="sec.288A-ssec.1" target.guid="_e6a93eec-e6ef-43b1-94cd-e3eb833a7d0d">subsection (1)</intref><intref check="valid" refid="sec.288A-ssec.1-para1.c" target.guid="_6fbb20f0-9699-4c40-b122-cde02ee2a888">(c)</intref>, the notice must state the day the transfer takes effect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_99a91128-751b-44b2-8ce5-278acc6bf754" id="sec.288A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the chief executive does not give the holder a notice under <intref check="valid" refid="sec.288A-ssec.1" target.guid="_e6a93eec-e6ef-43b1-94cd-e3eb833a7d0d">subsection (1)</intref><intref check="valid" refid="sec.288A-ssec.1-para1.c" target.guid="_6fbb20f0-9699-4c40-b122-cde02ee2a888">(c)</intref>, the holder must, as required under <intref check="valid" refid="sec.292" target.guid="_21940938-f87d-4dd6-9453-0c2e8fab326c">section 292</intref>, decommission the bore.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_640f055c-38d7-44ff-85b3-f9fa769bd362" id="sec.289" provision.type="other" spent.amends="0"><no>289</no><heading guid="_e21d2150-32a1-4fbf-bc14-17055b00a6e2" id="sec.289-he">Transfer of petroleum well to holder of geothermal tenure or mining tenement</heading><block><txt break.before="1">A petroleum tenure holder may transfer a petroleum well in the petroleum tenure’s area to the holder of a geothermal tenure or mining tenement if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_17bcd531-c8df-43d8-bb2e-077fe77e0009" id="sec.289-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the well is in the geothermal tenure’s or mining tenement’s area; and</txt></block></li><li guid="_2ce5293d-1232-4e77-a48c-be3cc79210cc" id="sec.289-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a notice in the approved form and the transfer fee prescribed under a regulation have been lodged.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_0c039a1e-ce37-4c14-8f28-5d2a90eb44aa" id="sec.290" provision.type="other" spent.amends="0"><no>290</no><heading guid="_76f64374-2779-4c17-8bd8-16dd51bb2466" id="sec.290-he">Transfer of water observation bore to petroleum tenure or water monitoring authority holder</heading><subclause affected.by.uncommenced="0" guid="_a68aba9c-08a5-4a7d-a325-f1ca6c4be7df" id="sec.290-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A petroleum tenure holder or water monitoring authority holder may transfer a water observation bore in the area of the tenure or authority to the holder of another petroleum tenure or water monitoring authority if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cb40f539-7cb3-44e8-a385-9d362f119f50" id="sec.290-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the bore is in the area of the other tenure or authority; and</txt></block></li><li guid="_8c1830c6-db31-4708-88ee-7cd639f23950" id="sec.290-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a notice in the approved form and the transfer fee prescribed under a regulation have been lodged.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_25a3431d-5ed3-4032-a06d-fb3c884fa002" id="sec.290-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The approved form must require a statement by the holder transferring the bore that <intref check="valid" refid="sec.282" target.guid="_6ddcb103-3b1d-4ab1-9067-cb649637d171">section 282</intref> has been complied with for the bore.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_fe438d7a-f9a3-4692-93f2-acca95371827" id="ch.2-pt.10-div.3-sdiv.3"><no>Subdivision 3</no><heading guid="_72bfcd05-507b-42ab-a388-f0c037aa4504" id="ch.2-pt.10-div.3-sdiv.3-he">Notice of transfer</heading><clause affected.by.uncommenced="0" guid="_a58aa634-2046-40a9-b75f-0e4cb3085b8c" id="sec.291" provision.type="other" spent.amends="0"><no>291</no><heading guid="_581f9276-018c-4965-b630-4bd8356fe374" id="sec.291-he">Notice of transfer to <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref> regulator or <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref> chief executive</heading><subclause affected.by.uncommenced="0" guid="_e916abe9-cb46-4c38-a2ad-c1bebee1d124" id="sec.291-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a transfer is made under <intref check="valid" refid="sec.288" target.guid="_f488a078-1654-4110-a6ea-4709e75ee7cc">section 288</intref>, the chief executive must give the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref> regulator notice of the transfer.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6300dc53-f1ad-4940-aea9-eb9ced106a4e" id="sec.291-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If a transfer is made under <intref check="valid" refid="sec.289" target.guid="_640f055c-38d7-44ff-85b3-f9fa769bd362">section 289</intref>, the chief executive must give the chief executive that administers the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref> notice of the transfer.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2d5f8dec-a7f8-48bd-935b-9d72b92b139b" id="sec.291-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A failure to comply with <intref check="valid" refid="sec.291-ssec.1" target.guid="_e916abe9-cb46-4c38-a2ad-c1bebee1d124">subsection (1)</intref> or <intref check="valid" refid="sec.291-ssec.2" target.guid="_6300dc53-f1ad-4940-aea9-eb9ced106a4e">(2)</intref> does not invalidate or otherwise affect the transfer.</txt></block></subclause></clause></subdivision></division><division affected.by.uncommenced="0" guid="_ec68f6b5-7b11-432a-aaa3-17ee4a4c219d" id="ch.2-pt.10-div.4"><no>Division 4</no><heading guid="_af82efdf-fb16-405a-8e77-fe05ed3f3846" id="ch.2-pt.10-div.4-he">Decommissioning of petroleum wells, water injection bores, water observation bores and water supply bores</heading><clause affected.by.uncommenced="0" guid="_21940938-f87d-4dd6-9453-0c2e8fab326c" id="sec.292" provision.type="other" spent.amends="0"><no>292</no><heading guid="_9f791a72-6b9a-4ad5-9044-1434add30e1f" id="sec.292-he">Obligation to decommission</heading><subclause affected.by.uncommenced="0" guid="_a2236d3c-4213-4641-b187-ddc39b42328e" id="sec.292-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to a person (the <defterm guid="_166a6c31-9edb-4a04-9d3c-43918a86cb2c" id="sec.292-def.responsibleperson" type="definition">responsible person</defterm>) who holds a petroleum tenure on which there is a petroleum well, water injection bore, water observation bore or water supply bore drilled by or for the tenure holder or that has been transferred to the tenure holder, unless the well or bore has, under <intref check="valid" refid="ch.2-pt.10-div.3" target.guid="_b1c2fbaa-a819-4abc-b800-38c31a636c67">division 3</intref>, been transferred to someone else.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bd8f0cfd-c095-4717-ae2a-265c01d499a9" id="sec.292-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The responsible person must ensure the well or bore is decommissioned from use under this Act before—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_38823de6-4dd8-4ec0-86dc-ea65aac742fd" id="sec.292-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the tenure or authority ends; or</txt></block></li><li guid="_57df81c9-0116-489c-b4a7-e17e87f61b5f" id="sec.292-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the land on which the well or bore is located ceases to be in the area of the tenure or authority.</txt></block></li></list></block><penalty guid="_7a796c8c-2d4e-4610-8063-cde6a2f583c0" id="sec.292-ssec.2-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty><note guid="_9bd3b0da-0243-4273-8cfa-34446c959050" id="sec.292-ssec.2-note" type="example"><heading guid="_b1d6a297-145a-498a-a5fb-064aa53a66bf" id="sec.292-ssec.2-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_9a1da8ce-2039-4e47-b808-ba25af55df67" id="sec.292-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.292-ssec.2" target.guid="_bd8f0cfd-c095-4717-ae2a-265c01d499a9">subsection (2)</intref> does not apply—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_546bc30e-9f76-4275-a26c-9d5f18bdd533" id="sec.292-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for land that, under <intref check="valid" refid="sec.101" target.guid="_ecb16f24-7357-4c3c-87b6-6fbc88f80008">section 101</intref><intref check="valid" refid="sec.101-ssec.1" target.guid="_a755d66e-07fb-4a96-ba52-55e4ec79c02e">(1)</intref>, ceases to be in the area of an authority to prospect; or</txt></block></li><li guid="_6a7fdaac-d878-4f3e-ac6f-8137d90b3b5b" id="sec.292-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the tenure or authority ends because it is divided under this chapter; or</txt></block></li><li guid="_f1927595-cbf2-4829-9fe1-81fccf1920bb" id="sec.292-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">for a petroleum well—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e1dc3109-22fb-4ebd-a2a3-1b7e4fcc1f14" id="sec.292-ssec.3-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">if a GHG tenure is granted; and</txt></block></li><li guid="_fd7a5044-ab1e-4f31-9a49-581c56d8b3a6" id="sec.292-ssec.3-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the GHG tenure’s area includes the well; and</txt></block></li><li guid="_916fcf01-acd7-464e-88b9-6e306ac53279" id="sec.292-ssec.3-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the petroleum tenure holder and the GHG tenure holder have agreed in writing that the GHG tenure holder is to assume responsibility for the well; and</txt></block></li><li guid="_df2165af-c4a4-4f27-b06f-256116deb053" id="sec.292-ssec.3-para1.c-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">a copy of the agreement has been lodged.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_67bb1e22-8d9f-4d56-bd02-ad05ad00b7bb" id="sec.292-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">For <intref check="valid" refid="sec.292-ssec.2" target.guid="_bd8f0cfd-c095-4717-ae2a-265c01d499a9">subsection (2)</intref>, the well or bore is decommissioned from use under this Act only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_67b4f0f1-95ac-4afe-b7a8-c94831509251" id="sec.292-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">it has been plugged and abandoned in the way prescribed under a regulation; and</txt></block></li><li guid="_52a6803f-1754-45fe-b915-2f4ab3e322f3" id="sec.292-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for a bore—the decommissioning complies with the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.816" target.doc.id="act-2000-034" target.guid="_a6387601-862c-4245-be89-b02bf5cf3735" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act">sections 816</legref> and <legref check="valid" jurisd="QLD" refid="sec.817" target.doc.id="act-2000-034" target.guid="_144a723f-54a4-4421-b70b-202756c13dd2" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act">817</legref>; and</txt></block></li><li guid="_fca5b285-7f13-43ad-aaf7-9658a94e4993" id="sec.292-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the responsible person has given the chief executive a notice, in the approved form, about the decommissioning of the well or bore.</txt><note guid="_e5e653da-e2d7-4575-88bd-e752ef942ece" id="sec.292-ssec.4-para1.c-note" type="example"><heading guid="_e090b11f-6698-4e24-bb36-f4f7e036116d" id="sec.292-ssec.4-para1.c-note-he">Note—</heading><block><txt break.before="1">For the power of an authorised person to ensure compliance, see <intref check="valid" refid="sec.580" target.guid="_818e9c24-4087-4d50-9017-6d57154a9a5c">section 580</intref>.</txt></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d4fae3cf-0041-4e38-a30b-02e7af929827" id="sec.292-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0"><intref check="valid" refid="sec.292-ssec.4" target.guid="_67bb1e22-8d9f-4d56-bd02-ad05ad00b7bb">Subsection (4)</intref><intref check="valid" refid="sec.292-ssec.4-para1.b" target.guid="_52a6803f-1754-45fe-b915-2f4ab3e322f3">(b)</intref> applies only to the extent it is not inconsistent with <intref check="valid" refid="sec.292-ssec.4" target.guid="_67bb1e22-8d9f-4d56-bd02-ad05ad00b7bb">subsection (4)</intref><intref check="valid" refid="sec.292-ssec.4-para1.a" target.guid="_67b4f0f1-95ac-4afe-b7a8-c94831509251">(a)</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1b1e6027-d936-41f9-af53-e45af3790bda" id="sec.293" provision.type="other" spent.amends="0"><no>293</no><heading guid="_d4bbc68f-839f-42fc-bc3c-7e99e60d3bf5" id="sec.293-he">Right of entry to facilitate decommissioning</heading><subclause affected.by.uncommenced="0" guid="_65faa64e-c160-4e97-a599-5221beeeb984" id="sec.293-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f3bd4b18-74d3-4f76-add8-7567d07c81cd" id="sec.293-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a responsible person under <intref check="valid" refid="sec.292" target.guid="_21940938-f87d-4dd6-9453-0c2e8fab326c">section 292</intref> has not carried out decommissioning on land as required under that section; and</txt></block></li><li guid="_169f597c-2c4e-4387-9c78-4df14d0fb489" id="sec.293-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the relevant petroleum tenure or water monitoring authority has ended or the land on which the well or bore is located is no longer in the area of the tenure or authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d625c8d4-06a5-4447-aba4-1a6a2b30beb8" id="sec.293-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The responsible person may enter the following land to carry out the decommissioning—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8b29abfa-dcbe-4cb3-98df-2532765441d0" id="sec.293-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">land (the <defterm guid="_529e3f1f-e01a-4299-9c07-465424c9ab87" id="sec.293-ssec.2-def.primaryland" type="definition">primary land</defterm>) on which the decommissioning must be, or was required to be, carried out;</txt></block></li><li guid="_6d8b4887-60dd-4d15-8aac-9d16b5925aa1" id="sec.293-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any other land (the <defterm guid="_190c71aa-b4ac-4523-88f6-c606e2895c56" id="sec.293-ssec.2-def.accessland" type="definition">access land</defterm>) it is reasonably necessary to cross for access to the primary land.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c91a7d28-c41e-4190-8ed5-c630bf375969" id="sec.293-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-2014-047" target.guid="_78e7ee55-dcff-4087-b0b9-13497e839af3" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">chapter 3</legref>, <legref check="valid" jurisd="QLD" refid="ch.3-pt.2" target.doc.id="act-2014-047" target.guid="_adcc85c6-c389-49c8-b998-858dca31ac1f" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">parts 2</legref>, <legref check="invalid" jurisd="QLD" type="act">3</legref> and <legref check="invalid" jurisd="QLD" type="act">6</legref> and <legref check="invalid" jurisd="QLD" type="act">part 7</legref>, <legref check="invalid" jurisd="QLD" refid="pt.7-div.1" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">divisions 1</legref>, <legref check="valid" jurisd="QLD" refid="ch.3-pt.2" target.doc.id="act-2014-047" target.guid="_adcc85c6-c389-49c8-b998-858dca31ac1f" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">2</legref> and <legref check="invalid" jurisd="QLD" type="act">5</legref> (other than <intref check="invalid" refid="sec.293-ssec.3-sdiv.3">subdivision 3</intref>) applies to the responsible person, in the following way—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d2491f51-97f8-4183-b639-82ced97e497a" id="sec.293-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the tenure or authority has ended, as if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f48c66d8-c128-4696-96a9-1b4be8204187" id="sec.293-ssec.3-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">it were still in force; and</txt></block></li><li guid="_97f274cf-4a0b-473f-891e-e1f66271cb02" id="sec.293-ssec.3-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the person is its holder;</txt></block></li></list></block></li><li guid="_2ceb9074-3f3f-4971-b3d7-faa6a8cd4a2c" id="sec.293-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">as if the primary land and access land is in the area of the tenure or authority;</txt></block></li><li guid="_57c8ed65-e59a-4537-8697-726247d1fe8d" id="sec.293-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">as if the decommissioning is an authorised activity for the tenure or authority.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b1326749-a36f-43d9-a9a7-e177045010d0" id="sec.294" provision.type="other" spent.amends="0"><no>294</no><heading guid="_da50d215-1486-453d-8844-3e63c0c188a9" id="sec.294-he">Responsibility for well or bore after decommissioning</heading><subclause affected.by.uncommenced="0" guid="_ff52dc31-d8c6-4055-89f6-b96146537034" id="sec.294-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a petroleum tenure holder or water monitoring authority holder has, under <intref check="valid" refid="sec.292" target.guid="_21940938-f87d-4dd6-9453-0c2e8fab326c">section 292</intref>, decommissioned a petroleum well, water injection bore, water observation bore or water supply bore.</txt><note guid="_b57b99ce-0a8c-4885-862c-244dfa4ab2e6" id="sec.294-ssec.1-note" type="example"><heading guid="_d55a4a6a-916c-498e-824b-2c892b05d4e2" id="sec.294-ssec.1-note-he">Note—</heading><block><txt break.before="1">For ownership before decommissioning, see <intref check="valid" refid="sec.542" target.guid="_67ab1546-3583-4a9f-9c2e-1abd93e9559b">section 542</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_4bd227c0-f993-4496-b90d-2491535b41f1" id="sec.294-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite the decommissioning, the holder continues to be responsible under this Act for the well or bore until the earlier of the following times (the <defterm guid="_e00991f1-58dc-494f-a2dc-d2a58b2c2666" id="sec.294-def.relevanttime" type="definition">relevant time</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4e2496ac-7d5f-4ead-b678-5f8fa271ac95" id="sec.294-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">when the tenure or authority ends;</txt></block></li><li guid="_70ff09d7-9093-4706-9450-889dbd115c84" id="sec.294-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">when the land on which the well or bore is located ceased to be in the area of the tenure or authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f02b78b5-2feb-4ced-ab92-c3e8fa2750a1" id="sec.294-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">At the relevant time the well or bore is taken to have been transferred to the State.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3945b56f-e8fe-4ff8-a2bf-743e309c4282" id="sec.294-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0"><intref check="valid" refid="sec.294-ssec.3" target.guid="_f02b78b5-2feb-4ced-ab92-c3e8fa2750a1">Subsection (3)</intref> applies despite—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_10fd4ae9-4845-48f3-842b-3ee9c9f26b86" id="sec.294-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the well or bore being on or part of land owned by someone else; or</txt></block></li><li guid="_c01f6097-cc2a-4294-ad10-5996efb6039a" id="sec.294-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the sale or other disposal of the land.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_379413f3-6540-4e04-8e04-7453898f9900" id="sec.294-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">After the relevant time, the State may transfer the well or bore.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_33f5142c-347b-4af8-a01a-a719ecf3fa5b" id="sec.294-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">However—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0b4b10a6-9dbe-4fb4-94a5-0914706af534" id="sec.294-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the transfer from the State can only be to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e5bc7b2b-8583-420b-bfee-1e0081f30745" id="sec.294-ssec.6-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the owner of the land on which the well or bore is located; or</txt></block></li><li guid="_6905ba26-cf0c-4dc0-867c-d55aad05f703" id="sec.294-ssec.6-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the holder of a geothermal tenure or mining tenement the area of which includes that land; and</txt></block></li></list></block></li><li guid="_028f1798-e3d4-4424-b739-47427313a1a7" id="sec.294-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the transfer from the State and the use of the well or bore by the transferee is subject to this Act and any other relevant Act or law.</txt></block></li></list></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_703512d1-9e03-4c9d-bd52-82121caabcf5" id="ch.2-pt.10-div.5"><no>Division 5</no><heading guid="_8d13334a-5ee1-4e0e-92e0-859f4c9705b0" id="ch.2-pt.10-div.5-he">Remediation activity</heading><clause affected.by.uncommenced="0" guid="_71f74295-f4f8-460f-8ded-c197be9135f3" id="sec.294A" provision.type="other" spent.amends="0"><no>294A</no><heading guid="_50ea76f3-1457-4bb4-a0b7-4dea24d93bfa" id="sec.294A-he">Definitions for <intref check="valid" refid="ch.2-pt.10-div.5" target.guid="_703512d1-9e03-4c9d-bd52-82121caabcf5">div 5</intref></heading><block><txt break.before="1">In this part—</txt><deflist><definition affected.by.uncommenced="0" guid="_ffc4e119-f9f8-4a27-8c68-b56bcc5d7d68" id="sec.294A-def.authorisedperson_"><txt break.before="1"><defterm guid="_417f4703-b61a-4faf-abb8-e7afc000a2d8" id="sec.294A-def.authorisedperson" type="definition">authorised person</defterm> means a person authorised by the chief executive, under <intref check="valid" refid="sec.294B" target.guid="_e8b2f72a-8645-41fd-900e-1eda6dd5cc11">section 294B</intref>, to carry out a remediation activity.</txt></definition><definition affected.by.uncommenced="0" guid="_b086e172-55ab-4bf9-84d8-8a4ad85e4a93" id="sec.294A-def.lowerflammabilitylimit_"><txt break.before="1"><defterm guid="_0b32bcd3-9c7b-4ab3-b056-8f6f99ecad65" id="sec.294A-def.lowerflammabilitylimit" type="definition">lower flammability limit</defterm> means the smallest amount of gas that supports a self-propagating flame when mixed with air (or oxygen) and ignited.</txt></definition><definition affected.by.uncommenced="0" guid="_29d24906-363b-4fa9-991f-d384fe08f136" id="sec.294A-def.remediationactivity_"><txt break.before="1"><defterm guid="_086298f6-1366-4891-8243-38d4a109eafc" id="sec.294A-def.remediationactivity" type="definition">remediation activity</defterm> see <intref check="valid" refid="sec.294B" target.guid="_e8b2f72a-8645-41fd-900e-1eda6dd5cc11">section 294B</intref>.</txt></definition></deflist></block></clause><clause affected.by.uncommenced="0" guid="_e8b2f72a-8645-41fd-900e-1eda6dd5cc11" id="sec.294B" provision.type="other" spent.amends="0"><no>294B</no><heading guid="_1255d4ce-8bb9-498d-9408-1078b08bbf4f" id="sec.294B-he">Authorised person to carry out remediation activities</heading><subclause affected.by.uncommenced="0" guid="_5e018a1d-2a16-4d6f-a659-f34fd4738764" id="sec.294B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may authorise a person to remediate any of the following bores or wells and to rehabilitate the surrounding area in compliance with the requirements prescribed under a regulation (the <defterm guid="_d650917c-a075-4239-9ff5-536e15aa7678" id="sec.294B-def.remediationactivity" type="definition">remediation activity</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3aadf7ca-5137-4901-a0f5-f814a50f9781" id="sec.294B-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a bore or well posing a risk to life or property;</txt></block></li><li guid="_1fc74870-c916-44c1-a396-de8b37def517" id="sec.294B-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a bore or well the chief executive reasonably believes is a legacy borehole;</txt></block></li><li guid="_962965c8-a1af-4946-8a89-485a580ab4d3" id="sec.294B-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a bore or well on fire or emitting gas causing a gas concentration in the surrounding air greater than the lower flammability limit.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b5f6c2df-b888-449c-b9dc-7a0953461278" id="sec.294B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_d0fa8b88-f8c2-4861-b888-b5965e8be719" id="sec.294B-ssec.2-def.remediate_"><txt break.before="1"><defterm guid="_0ed8b99d-b95d-4082-a8ac-c3bfb33cfb92" id="sec.294B-ssec.2-def.remediate" type="definition">remediate</defterm>, a bore or well, includes plug and abandon the bore or well.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_cc1d24f1-c466-4ba3-bd91-20e4330aed25" id="sec.294C" provision.type="other" spent.amends="0"><no>294C</no><heading guid="_1b2f82ce-87fd-41d8-94de-1a466ae54e32" id="sec.294C-he">Entering land to carry out remediation activities</heading><subclause affected.by.uncommenced="0" guid="_ca2a4e53-42c2-4113-bb62-585710ffc3ca" id="sec.294C-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the following land—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8e2ee026-27cb-4637-82ec-c14c7e444575" id="sec.294C-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">land (<defterm guid="_4f3f1214-5a6d-42d7-a5b3-2d22de17eb96" id="sec.294C-ssec.1-def.primaryland" type="definition">primary land</defterm>) on which a legacy borehole exists;</txt></block></li><li guid="_8dfdf114-561c-4af4-bf0e-c97e990ecfec" id="sec.294C-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">land (<defterm guid="_27f904b4-570f-4af0-93f7-92705ba73234" id="sec.294C-ssec.1-def.adjacentland" type="definition">adjacent land</defterm>) that is adjacent to primary land if an authorised person has no other reasonably practicable way of entering the primary land without entering the adjacent land.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_57acd5ca-50f0-495e-86e1-4408ad6ef7ec" id="sec.294C-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An authorised person may enter land to carry out a remediation activity—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_22c0d972-640e-4a86-9406-4b059c09968f" id="sec.294C-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the remediation activity relates to a bore or well mentioned in <intref check="valid" refid="sec.294B" target.guid="_e8b2f72a-8645-41fd-900e-1eda6dd5cc11">section 294B</intref><intref check="valid" refid="sec.294B-ssec.1" target.guid="_5e018a1d-2a16-4d6f-a659-f34fd4738764">(1)</intref><intref check="valid" refid="sec.294B-ssec.1-para1.a" target.guid="_3aadf7ca-5137-4901-a0f5-f814a50f9781">(a)</intref> or <intref check="valid" refid="sec.294B-ssec.1-para1.c" target.guid="_962965c8-a1af-4946-8a89-485a580ab4d3">(c)</intref>—at any time; or</txt></block></li><li guid="_00616e18-97ed-4ab8-aaaa-c18f73b1b6de" id="sec.294C-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—within a period of 10 business days starting on the earlier of the following days—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bd3a999a-7c88-481e-a390-a60757eb3d90" id="sec.294C-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the day the owner of the land is given notice of the entry under <intref check="valid" refid="sec.294D" target.guid="_d32be60b-4ca4-42e2-9f6b-0ec02e804473">section 294D</intref>;</txt></block></li><li guid="_679d7b55-2e43-4928-beca-5c31f56da677" id="sec.294C-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the day the occupier of the land is given notice of the entry under <intref check="valid" refid="sec.294D" target.guid="_d32be60b-4ca4-42e2-9f6b-0ec02e804473">section 294D</intref>.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a540920b-1a2b-413a-9030-0d5e8fafac67" id="sec.294C-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.294C-ssec.2" target.guid="_57acd5ca-50f0-495e-86e1-4408ad6ef7ec">subsection (2)</intref> does not authorise the entry of a structure, or a part of a structure, used for residential purposes without the consent of the occupier of the structure or part.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d32be60b-4ca4-42e2-9f6b-0ec02e804473" id="sec.294D" provision.type="other" spent.amends="0"><no>294D</no><heading guid="_b59ff3f0-5769-453c-8094-5f4b01c80d27" id="sec.294D-he">Notice of entry</heading><subclause affected.by.uncommenced="0" guid="_c3700307-aab6-4e56-a405-2280c2dd4b36" id="sec.294D-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An authorised person entering land under <intref check="valid" refid="sec.294C" target.guid="_cc1d24f1-c466-4ba3-bd91-20e4330aed25">section 294C</intref> to carry out a remediation activity must give the owner and the occupier of the land written notice of the entry—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0f49e4df-17a0-4d17-903f-78309436efe2" id="sec.294D-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the remediation activity relates to a bore or well mentioned in <intref check="valid" refid="sec.294B" target.guid="_e8b2f72a-8645-41fd-900e-1eda6dd5cc11">section 294B</intref><intref check="valid" refid="sec.294B-ssec.1" target.guid="_5e018a1d-2a16-4d6f-a659-f34fd4738764">(1)</intref><intref check="valid" refid="sec.294B-ssec.1-para1.a" target.guid="_3aadf7ca-5137-4901-a0f5-f814a50f9781">(a)</intref> or <intref check="valid" refid="sec.294B-ssec.1-para1.c" target.guid="_962965c8-a1af-4946-8a89-485a580ab4d3">(c)</intref>—within 10 business days after the entry is made; or</txt></block></li><li guid="_af09ac4a-95e8-414e-8963-f4c60791d43f" id="sec.294D-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—before entering the land.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_23e8e677-4f3a-465b-98b2-691d9ee654e9" id="sec.294D-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The written notice must state the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_54cffd26-b9be-4763-91cc-89e795a0d880" id="sec.294D-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">when the entry was, or is to be, made;</txt></block></li><li guid="_a5e18bc5-f546-44b4-bede-8c716a23b3a6" id="sec.294D-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the purpose of the entry;</txt></block></li><li guid="_f8ec07c8-beed-4afe-a142-16d5b47abfef" id="sec.294D-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that the authorised person is permitted under this Act to enter the land without consent or a warrant;</txt></block></li><li guid="_d2908d96-01b6-4e9c-8a18-c4307a3b8581" id="sec.294D-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the remediation activity carried out or proposed to be carried out.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d58d5c32-11b3-4333-bd89-ae78a358b853" id="sec.294E" provision.type="other" spent.amends="0"><no>294E</no><heading guid="_47754aaa-7a3e-45ae-966c-dfe081a67465" id="sec.294E-he">Obligation of authorised person in carrying out remediation activity</heading><block><txt break.before="1">An authorised person who enters land under this part—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_81d94e93-2855-438f-bc41-6e4f3fc12325" id="sec.294E-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must not cause, or contribute to, unnecessary damage to any structure or works on the land; and</txt></block></li><li guid="_92e6bb8c-bb2d-41fe-9ac6-e8cdd3d71f7d" id="sec.294E-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">must take all reasonable steps to ensure the person causes as little inconvenience, and does as little other damage, as is practicable in the circumstances.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_9423a0f5-eb8e-4955-9dcf-4cfeda94627f" id="sec.294F" provision.type="other" spent.amends="0"><no>294F</no><heading guid="_734b1df7-5018-46cb-8d5a-d8124bcabe68" id="sec.294F-he">Application of particular safety Acts to remediation activity</heading><subclause affected.by.uncommenced="0" guid="_11398af4-e45c-4dbf-8fe1-6e82bd1abff7" id="sec.294F-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The place at which a remediation activity is authorised to be carried out is taken to be a coal mine, to which the <legref check="valid" jurisd="QLD" target.doc.id="act-1999-039" target.version.series="aa8f4811-7589-4cef-8731-c79d6cf94546" type="act"><name emphasis="yes">Coal Mining Safety and Health Act 1999</name></legref> applies, if the authorised person ordinarily carries out similar activities under that Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e1ed209a-962b-45b5-82e3-4791e526e2ec" id="sec.294F-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The place at which a remediation activity is authorised to be carried out is taken to be a mine, to which the <legref check="valid" jurisd="QLD" target.doc.id="act-1999-040" target.version.series="abae80d5-3c25-4219-a120-96b52ce5de2c" type="act"><name emphasis="yes">Mining and Quarrying Safety and Health Act 1999</name></legref> applies, if the authorised person ordinarily carries out similar activities under that Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_610250dc-cb8f-4cbb-8d27-22a2aa4ff981" id="sec.294F-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The place at which a remediation activity is authorised to be carried out is taken to be an operating plant under this Act if the authorised person ordinarily carries out similar activities under this Act.</txt></block></subclause></clause></division></part></chapter><chapter affected.by.uncommenced="0" guid="_7d989cb7-da2a-4737-842c-bd1944dbb54e" id="ch.3"><no>Chapter 3</no><heading guid="_4ecebb50-6a65-4fd1-a570-da73125d122e" id="ch.3-he">Provisions for coal seam gas</heading><part affected.by.uncommenced="0" guid="_46b7d5cd-14bc-43bd-94bd-da95208ecffa" id="ch.3-pt.1"><no>Part 1</no><heading guid="_b55d6c5c-000c-4631-82a9-cd56a79b243f" id="ch.3-pt.1-he">Preliminary</heading><division affected.by.uncommenced="0" guid="_aade637f-fbd5-4586-9f82-cd292e83219b" id="ch.3-pt.1-div.1"><no>Division 1</no><heading guid="_b36d1653-3a48-4274-a281-a23bb311c95b" id="ch.3-pt.1-div.1-he">Introduction</heading><clause affected.by.uncommenced="0" guid="_58a37fd3-2ce6-4075-b4bc-45256d153e95" id="sec.297" provision.type="other" spent.amends="0"><no>297</no><heading guid="_b8c6739c-aa47-4143-8e1b-29b740dc8b41" id="sec.297-he">Relationship with chs 2 and 5 and <intref check="valid" refid="ch.15" target.guid="_5715b228-7bee-4f64-9a68-deae34090b8e">ch 15</intref>, <intref check="valid" refid="ch.15-pt.3" target.guid="_7b6cfafe-1fa1-46dc-b544-e3327a0c144e">pt 3</intref> and the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref></heading><subclause affected.by.uncommenced="0" guid="_67bde1a9-d37c-49ad-9bc6-ab1773c47a21" id="sec.297-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Requirements and restrictions under this chapter apply as well as any relevant requirements under chapters 2 or 5 or <intref check="valid" refid="ch.15" target.guid="_5715b228-7bee-4f64-9a68-deae34090b8e">chapter 15</intref>, <intref check="valid" refid="ch.15-pt.3" target.guid="_7b6cfafe-1fa1-46dc-b544-e3327a0c144e">part 3</intref> or the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="yes">Common Provisions Act</name></legref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f88f735c-48e1-4966-873c-1801b16afa78" id="sec.297-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If this chapter imposes a requirement for or a restriction on the granting, renewal, division or transfer of a petroleum tenure, the tenure can not be granted, renewed, divided or transferred if the restriction applies or if the requirement has not been complied with.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_af671c2b-15d6-4047-a297-17a64fecf3d6" id="sec.297-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If this chapter imposes a requirement for or a restriction on the carrying out of an authorised activity for a petroleum tenure or data acquisition authority, despite <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, the activity is not an authorised activity for the tenure while the restriction applies or if the requirement has not been complied with.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ae9d9409-8e3c-47a8-897b-5cf3475773d2" id="sec.297-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If a provision of this chapter conflicts with a provision of <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref> or <intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">5</intref> or <intref check="valid" refid="ch.15" target.guid="_5715b228-7bee-4f64-9a68-deae34090b8e">chapter 15</intref>, <intref check="valid" refid="ch.15-pt.3" target.guid="_7b6cfafe-1fa1-46dc-b544-e3327a0c144e">part 3</intref> or the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, the provision of this chapter prevails to the extent of the inconsistency.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d6e5c1ac-f339-482a-8127-a219eb59d1f6" id="sec.298" provision.type="other" spent.amends="0"><no>298</no><heading guid="_adf04bed-17ee-4db0-b2b5-96c2ad94d1da" id="sec.298-he">Description of petroleum leases for ch 3 and <intref check="valid" refid="ch.15" target.guid="_5715b228-7bee-4f64-9a68-deae34090b8e">ch 15</intref>, <intref check="valid" refid="ch.15-pt.3" target.guid="_7b6cfafe-1fa1-46dc-b544-e3327a0c144e">pt 3</intref></heading><block><txt break.before="1">Despite <intref check="valid" refid="sec.29" target.guid="_d20e002f-c415-4051-bfa8-5447f61eb769">section 29</intref> and any provision of this chapter or <intref check="valid" refid="ch.15" target.guid="_5715b228-7bee-4f64-9a68-deae34090b8e">chapter 15</intref>, <intref check="valid" refid="ch.15-pt.3" target.guid="_7b6cfafe-1fa1-46dc-b544-e3327a0c144e">part 3</intref>, a petroleum lease applied for or granted under this chapter may be described in metes and bounds.</txt></block></clause></division><division affected.by.uncommenced="0" guid="_4148d660-1764-4dc1-b549-ce1a75a1e64e" id="ch.3-pt.1-div.2"><no>Division 2</no><heading guid="_6727eaff-ece7-4d82-8a4e-cc20b3666ccb" id="ch.3-pt.1-div.2-he">Definitions for <intref check="valid" refid="ch.3" target.guid="_7d989cb7-da2a-4737-842c-bd1944dbb54e">chapter 3</intref></heading><clause affected.by.uncommenced="0" guid="_eb08b929-4977-41bb-96fd-2d40946dc328" id="sec.299" provision.type="other" spent.amends="0"><no>299</no><heading guid="_215ec93f-ab23-432f-9915-e042e0813073" id="sec.299-he">What is <defterm guid="_4bc39281-85b6-4226-b9f7-2206d83c86a6" type="mention">coal seam gas</defterm> and <defterm guid="_073f56fa-7e21-45a8-8a2e-9f54853afcfb" type="mention">incidental coal seam gas</defterm></heading><subclause affected.by.uncommenced="0" guid="_496ef8e8-8606-4cd6-aca9-11e28e6660e6" id="sec.299-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0"><defterm guid="_6ec06d4c-5faf-4dc6-b926-398deed2d98a" id="sec.299-def.Coalseamgas" type="definition">Coal seam gas</defterm> is petroleum (in any state) occurring naturally in association with coal or oil shale, or in strata associated with coal or oil shale mining.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_aabe1ecc-591c-4c9c-80c7-d741b4ea366e" id="sec.299-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><defterm guid="_aef94ee9-93be-47ca-930a-6a3b6c213002" id="sec.299-def.Incidentalcoalseamgas" type="definition">Incidental coal seam gas</defterm> is incidental coal seam gas as defined under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.318CM" target.doc.id="act-1989-110" target.guid="_c4cd0783-ee07-423e-9341-195a04b0637e" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 318CM</legref><legref check="invalid" jurisd="QLD" type="act">(2)</legref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7ce52326-28ba-4367-bd0a-edb4d3f81999" id="sec.300" provision.type="other" spent.amends="0"><no>300</no><heading guid="_fa526461-0a56-4929-b605-a42ffe15525a" id="sec.300-he">What is <defterm guid="_3bfe231c-e96d-46e1-ac78-452d70defea1" type="mention">oil shale</defterm></heading><block><txt break.before="1"><defterm guid="_a1c1e52c-8232-412b-90ae-e1fa72ecac02" id="def.Oilshale" type="definition">Oil shale</defterm> is any shale or other rock (other than coal) from which a gasification or retorting product may be extracted or produced.</txt></block></clause><clause affected.by.uncommenced="0" guid="_483b350d-4900-4d7d-884b-0c64f62e1652" id="sec.301" provision.type="other" spent.amends="0"><no>301</no><heading guid="_f268b27c-acbb-4ee1-bcde-ae231fae280a" id="sec.301-he">What is a <defterm guid="_153860f8-97c0-4291-9117-efd4b79fa1ef" type="mention">coal exploration tenement</defterm> and a coal mining lease</heading><subclause affected.by.uncommenced="0" guid="_3d624ecd-7054-46e8-9d73-c9c51a904aef" id="sec.301-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A <defterm guid="_378935bf-5d6e-4c14-8280-5c74cef7fc54" id="sec.301-def.coalexplorationtenement-oc.2" type="definition">coal exploration tenement</defterm> is an exploration permit or mineral development licence under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref> granted for coal.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0a0cbd39-26e7-4099-9b17-107af1af01ec" id="sec.301-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A <defterm guid="_9c7aa168-8f23-4435-829b-300292fd8ee7" id="sec.301-def.coalmininglease" type="definition">coal mining lease</defterm> is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3227de93-9fc8-47fd-ad58-1e3cbba631c2" id="sec.301-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a mining lease for coal; or</txt></block></li><li guid="_fb1cd1d0-6b80-47ca-afee-f35849da5e81" id="sec.301-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a special coal mining lease granted under any of the following Acts, an agreement provided for under any of the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">Act</legref>s or any amendment of an agreement provided for under any of the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">Act</legref>s—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8b837b2e-c3fa-48a4-aafe-ea3190139dca" id="sec.301-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1968-055" target.version.series="5da599cc-a2e3-4188-a304-206ddd9db228" type="act"><name emphasis="yes">Central Queensland Coal Associates Agreement Act 1968</name></legref>;</txt></block></li><li guid="_9b277150-004b-45be-a90d-1e8417b0db46" id="sec.301-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the <legref check="invalid" jurisd="QLD" type="act"><name emphasis="yes">Thiess Peabody Mitsui Coal Pty. Ltd. Agreements Acts 1962</name></legref> to <i>1965</i>; or</txt></block></li></list></block></li><li guid="_27d1d1da-1964-4ba3-8885-8310450de1f8" id="sec.301-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a specific purpose mining lease for a purpose associated with, arising from or promoting the activity of coal mining, whether or not it is also granted for a purpose other than coal mining.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f0f8c8f5-fd72-4bec-8c93-e4bc8ff5dbea" id="sec.301-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0"><intref check="valid" refid="sec.301-ssec.1" target.guid="_3d624ecd-7054-46e8-9d73-c9c51a904aef">Subsections (1)</intref> and <intref check="valid" refid="sec.301-ssec.2" target.guid="_0a0cbd39-26e7-4099-9b17-107af1af01ec">(2)</intref><intref check="valid" refid="sec.301-ssec.2-para1.a" target.guid="_3227de93-9fc8-47fd-ad58-1e3cbba631c2">(a)</intref> apply whether or not the lease, permit or licence is also granted for another mineral.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_cea0ceea-f0d8-4d19-bc20-2694bc733e93" id="sec.301-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, for <intref check="valid" refid="ch.3-pt.1" target.guid="_46b7d5cd-14bc-43bd-94bd-da95208ecffa">parts 1</intref> to <intref check="valid" refid="ch.3-pt.5" target.guid="_59822ecb-942d-4546-ac03-3b1428443975">5</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_22c97625-91e0-489a-8d0c-91b743a5e70a" id="sec.301-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a coal exploration tenement does not include an exploration permit or mineral development licence granted for coal to which the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.4" target.doc.id="act-2014-047" target.guid="_0d62e6fe-c34b-427b-962c-c3c899f79f8b" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">chapter 4</legref>, applies; and</txt></block></li><li guid="_ed1a3ee7-2f58-46f7-ae6e-92929c1e13a5" id="sec.301-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a coal mining lease does not include a mining lease granted for coal to which the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.4" target.doc.id="act-2014-047" target.guid="_0d62e6fe-c34b-427b-962c-c3c899f79f8b" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">chapter 4</legref>, applies.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_ad5e0589-b8fc-43bd-b0d0-1cdd040bb038" id="sec.302" provision.type="other" spent.amends="0"><no>302</no><heading guid="_0f14b3fa-1c5b-48de-acfa-e0553e231146" id="sec.302-he">What is an <defterm guid="_a2b8df58-59c8-428c-928b-fac389ff2191" type="mention">oil shale exploration tenement</defterm> and an <defterm guid="_526c143c-3c54-4f77-8e3f-b3b4c1e4d467" type="mention">oil shale mining lease</defterm></heading><subclause affected.by.uncommenced="0" guid="_1ecedbfa-2421-4903-954d-16653bbc6f00" id="sec.302-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An <defterm guid="_9e886764-dc05-4160-aac4-d26ed2675d4a" id="sec.302-def.oilshaleexplorationtenement-oc.2" type="definition">oil shale exploration tenement</defterm> is an exploration permit or mineral development licence granted for oil shale.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0bb3a84e-c9f8-42c1-9080-ca56db02aae1" id="sec.302-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An <defterm guid="_601321f5-dc49-4ed8-807a-3443799eb187" id="sec.302-def.oilshalemininglease-oc.2" type="definition">oil shale mining lease</defterm> is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1706bd72-9e9f-4465-98a0-f559ae67fdb5" id="sec.302-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a mining lease for oil shale; or</txt></block></li><li guid="_0d780d99-ef4f-48a4-b40b-fe71fb0009d7" id="sec.302-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a specific purpose mining lease for a purpose associated with, arising from or promoting the activity of oil shale mining, whether or not it is also granted for a purpose other than oil shale mining.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0a345cdc-09af-4a0a-963a-a4e1e4262761" id="sec.302-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0"><intref check="valid" refid="sec.302-ssec.1" target.guid="_1ecedbfa-2421-4903-954d-16653bbc6f00">Subsections (1)</intref> and <intref check="valid" refid="sec.302-ssec.2" target.guid="_0bb3a84e-c9f8-42c1-9080-ca56db02aae1">(2)</intref><intref check="valid" refid="sec.302-ssec.2-para1.a" target.guid="_1706bd72-9e9f-4465-98a0-f559ae67fdb5">(a)</intref> apply whether or not the lease, permit or licence is also granted for another mineral.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f3bcd040-d2a8-4368-8eef-64194ba4e191" id="sec.303" provision.type="other" spent.amends="0"><no>303</no><heading guid="_e1f91420-fa41-4e5a-b658-b1f4e7cfaf7d" id="sec.303-he">What is a <defterm guid="_02b19e68-978c-4171-b7a4-92e830645085" type="mention">coal or oil shale mining tenement</defterm></heading><block><txt break.before="1">A <defterm guid="_fb2c5fc6-e800-4349-8dc1-e55056f4ddf0" id="def.coaloroilshaleminingtenement" type="definition">coal or oil shale mining tenement</defterm> is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5e6f5252-3dd8-4d43-8798-0c3e31fb9326" id="sec.303-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a coal exploration tenement; or</txt></block></li><li guid="_cd0e1010-3905-4cb0-8147-a81e1f813b14" id="sec.303-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an oil shale exploration tenement; or</txt></block></li><li guid="_74f9d3e8-bf3d-4008-a78f-31ac2e0ce9b7" id="sec.303-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a coal or oil shale mining lease.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_1c41655c-333e-48fa-862d-b5d27611a019" id="sec.303A" provision.type="other" spent.amends="0"><no>303A </no><heading guid="_3647f613-dfda-4bf1-aa89-75a4e4a4abf0" id="sec.303A-he">What is a <defterm guid="_b99ada9e-a013-401c-851f-dc9dea1b28c0" id="sec.303A-def.petroleumtenure" type="definition">petroleum tenure</defterm></heading><block><txt break.before="1">For <intref check="valid" refid="ch.3-pt.1" target.guid="_46b7d5cd-14bc-43bd-94bd-da95208ecffa">parts 1</intref> to <intref check="valid" refid="ch.3-pt.5" target.guid="_59822ecb-942d-4546-ac03-3b1428443975">5</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_efd22ece-c10a-4616-9208-17a2157ae55d" id="sec.303A-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a petroleum lease does not include a petroleum lease to which the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.4" target.doc.id="act-2014-047" target.guid="_0d62e6fe-c34b-427b-962c-c3c899f79f8b" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">chapter 4</legref>, applies; and</txt></block></li><li guid="_5474173c-78a3-486f-80d1-9cf32ee1b695" id="sec.303A-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an authority to prospect does not include an authority to prospect to which the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.4" target.doc.id="act-2014-047" target.guid="_0d62e6fe-c34b-427b-962c-c3c899f79f8b" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">chapter 4</legref>, applies.</txt></block></li></list></block></clause></division></part><part affected.by.uncommenced="0" guid="_60586bec-2198-4a1a-9860-a488c272707c" id="ch.3-pt.2"><no>Part 2</no><heading guid="_39d773ef-c428-4e23-925d-d3f79f8a2d3d" id="ch.3-pt.2-he">Obtaining petroleum lease over land in area of coal or oil shale exploration tenement</heading><division affected.by.uncommenced="0" guid="_0b0b11a3-c85f-4117-b2ee-a82a37bb5d16" id="ch.3-pt.2-div.1"><no>Division 1</no><heading guid="_b654bb62-bff2-4f4a-9a52-7dd534911863" id="ch.3-pt.2-div.1-he">Obtaining petroleum lease other than by or jointly with, or with the consent of, coal or oil shale exploration tenement holder</heading><subdivision affected.by.uncommenced="0" guid="_6a8365ea-d58d-4b54-9011-7dd9c38198f1" id="ch.3-pt.2-div.1-sdiv.1"><no>Subdivision 1</no><heading guid="_c916a767-f327-4989-a385-bc6fe2a5d505" id="ch.3-pt.2-div.1-sdiv.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_5ca8d3f0-aee0-43cd-b8c3-dc511a08e75f" id="sec.304" provision.type="other" spent.amends="0"><no>304</no><heading guid="_9d11e3ce-94f2-4d1d-aef2-9c61d47606d4" id="sec.304-he">Application of <intref check="valid" refid="ch.3-pt.2-div.1" target.guid="_0b0b11a3-c85f-4117-b2ee-a82a37bb5d16">div 1</intref></heading><subclause affected.by.uncommenced="0" guid="_8e39ff1d-2ef6-4bef-be0d-ab5c05101fbb" id="sec.304-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This division applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7f11c65a-68ad-43c5-bd7b-4ce2b2030ebb" id="sec.304-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">land is in the area of a coal or oil shale exploration tenement; and</txt></block></li><li guid="_dec77cf6-0375-464a-92d2-beef18ae7fe7" id="sec.304-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a person, who, under <intref check="valid" refid="sec.117" target.guid="_3f8f9173-3607-43d2-a692-aa8f1a2489e8">section 117</intref>, may make an ATP-related application for all or part of the land wishes to make that application.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_02f9aa7b-6dba-49ca-b8e7-7b05eb81034f" id="sec.304-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, this division does not apply if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7a1c1913-49d2-483c-a459-64e110c83416" id="sec.304-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the person is the tenement holder; or</txt></block></li><li guid="_c14db26b-db9e-47d5-98b2-65b28a54e372" id="sec.304-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the application is to be made jointly with the tenement holder; or</txt></block></li><li guid="_7e03a731-ff17-447e-b967-dedc7a742852" id="sec.304-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the application is made with the tenement holder’s written consent; or</txt></block></li><li guid="_d94f4af5-1869-4c91-bbc9-b75eb7d27880" id="sec.304-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the coal or oil shale exploration tenement is a mineral (f) pilot tenure.</txt></block></li></list><note guid="_f0a26849-8db1-4a2a-937a-42952a23cf6b" id="sec.304-ssec.2-note" type="example"><heading guid="_41013743-01c9-40c0-9f9c-7f1fe1f628a8" id="sec.304-ssec.2-note-he">Note—</heading><block><txt break.before="1">For the circumstances mentioned in <intref check="valid" refid="sec.304-ssec.2" target.guid="_02f9aa7b-6dba-49ca-b8e7-7b05eb81034f">subsection (2)</intref>, see <intref check="valid" refid="ch.3-pt.2-div.2" target.guid="_f13bd9b3-11be-4097-b13c-8f1d8ff3b62b">division 2</intref>.</txt></block></note></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_5d14b573-eaf9-4ab9-bf28-0ea46ffb3333" id="ch.3-pt.2-div.1-sdiv.2"><no>Subdivision 2</no><heading guid="_f80d3222-d153-440f-9a86-014a40219d07" id="ch.3-pt.2-div.1-sdiv.2-he">Provisions for making petroleum lease application</heading><clause affected.by.uncommenced="0" guid="_f8a0d070-7bc2-4125-8d40-9e466d7983f8" id="sec.305" provision.type="other" spent.amends="0"><no>305</no><heading guid="_a86773cf-2255-43b6-adca-b45aa209e3dc" id="sec.305-he">Additional requirements for making application</heading><subclause affected.by.uncommenced="0" guid="_70b8c943-5f80-451b-80db-9dfb144af0f0" id="sec.305-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The ATP-related application must include the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3ba6572c-d77e-4e66-9816-13819a493644" id="sec.305-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a statement (a <defterm guid="_f7ade13c-1df6-4361-9105-4ffbc5709e57" id="sec.305-ssec.1-def.CSGstatement" type="definition">CSG statement</defterm>) that complies with <intref check="valid" refid="sec.306" target.guid="_3015ef08-e9ea-42a5-ba7b-06369abb9aa7">section 306</intref>;</txt></block></li><li guid="_be4c97c0-3363-4c2a-837e-70ee6577372f" id="sec.305-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">other information that addresses the matters mentioned in <intref check="valid" refid="sec.305-ssec.2" target.guid="_e7307d87-4629-4837-bb3a-0f1f4dc40843">subsection (2)</intref> (the <defterm guid="_bccbd8fb-2cb0-402b-a7d8-de8fda847c34" id="sec.305-ssec.1-def.CSGassessmentcriteria" type="definition">CSG assessment criteria</defterm>), other than the matter mentioned in <intref check="valid" refid="sec.305-ssec.2" target.guid="_e7307d87-4629-4837-bb3a-0f1f4dc40843">subsection (2)</intref><intref check="valid" refid="sec.305-ssec.2-para1.e" target.guid="_b7f2a48d-ffd0-4204-8a5e-9c05b53e47a9">(e)</intref><intref check="valid" refid="sec.305-ssec.2-para1.e-para2.iii" target.guid="_9d71822f-5cdc-4690-8d29-4e8bd7fe93d0">(iii)</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e7307d87-4629-4837-bb3a-0f1f4dc40843" id="sec.305-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The CSG assessment criteria are—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d7505fd5-a4e6-4113-9f1c-e1a728d43554" id="sec.305-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the requirements of <intref check="valid" refid="ch.9" target.guid="_e115e3d8-9707-4c5d-b3e6-be71f8d522ee">chapter 9</intref>; and</txt></block></li><li guid="_35de3c23-815a-4d04-b2f0-89602b31f050" id="sec.305-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the initial development plan requirements; and</txt></block></li><li guid="_6a51f293-cb5f-4665-bf94-3eb868a339ce" id="sec.305-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the additional requirements under <intref check="valid" refid="ch.3-pt.6" target.guid="_125342c0-5c01-4b66-ba95-a4209c82febf">part 6</intref> for proposed initial development plans; and</txt></block></li><li guid="_800ec205-7817-42bc-a4bb-ab5b0a8ba043" id="sec.305-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the legitimate business interests of the applicant and the coal or oil shale exploration tenement holder (the <defterm guid="_01cd7a40-ae3c-4e74-89d3-cd854ca3198e" id="sec.305-ssec.2-def.parties" type="definition">parties</defterm>); and</txt><note guid="_e96139ea-576d-4679-8b49-5048c3b8577d" id="sec.305-ssec.2-para1.d-note" type="example"><heading guid="_6923558c-be5e-48b2-a82a-788566d1286e" id="sec.305-ssec.2-para1.d-note-he">Examples of a party’s legitimate business interests—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_cce4fa02-d93c-4776-b64b-cda0e0d07ba8" id="sec.305-ssec.2-para1.d-note-para2" provision.type="other"><no>•</no><block><txt break.before="0">contractual obligations</txt></block></li><li guid="_242ae544-c7aa-4fcf-92d7-70b163f7f5e0" id="sec.305-ssec.2-para1.d-note-para2-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">the effect on, and use of, existing infrastructure or mining or production facilities</txt></block></li><li guid="_2734eeaa-6649-4bf4-89f3-4f0f5f7d818e" id="sec.305-ssec.2-para1.d-note-para2-oc.3" provision.type="other"><no>•</no><block><txt break.before="0">exploration expenditure on relevant overlapping tenures</txt></block></li></list></block></note></block></li><li guid="_b7f2a48d-ffd0-4204-8a5e-9c05b53e47a9" id="sec.305-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the effect of the proposed petroleum lease on the future development of coal or oil shale resources from the land, including, for example, each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0ef47a41-7822-477c-a52d-8f977381d09f" id="sec.305-ssec.2-para1.e-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the proposed timing and rate of petroleum production and the development of coal or oil shale resources from the land;</txt></block></li><li guid="_2659e692-de7e-4076-b54b-f6eed9b29294" id="sec.305-ssec.2-para1.e-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the potential for the parties to make a coordination arrangement about—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_21f87ac6-b7e3-4e65-9fa2-d7310adee137" id="sec.305-ssec.2-para1.e-para2.ii-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">petroleum production under the proposed petroleum lease; and</txt></block></li><li guid="_83d458fe-88fd-49a3-b9b5-c25f65c92e47" id="sec.305-ssec.2-para1.e-para2.ii-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">coal or oil shale mining and any incidental coal seam gas mining under any future mining lease over the land;</txt></block></li></list></block></li><li guid="_9d71822f-5cdc-4690-8d29-4e8bd7fe93d0" id="sec.305-ssec.2-para1.e-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the attempts required of the applicant under <intref check="valid" refid="sec.310" target.guid="_5c7461ea-75bf-4ec5-9876-1d63143e9047">section 310</intref><intref check="valid" refid="sec.310-ssec.1" target.guid="_148aa051-4f01-485b-b155-36844ee2e479">(1)</intref><intref check="valid" refid="sec.310-ssec.1-para1.b" target.guid="_3c31ab2e-3ea4-4a52-af72-19dc0971f964">(b)</intref> and any changes of the type mentioned in <intref check="valid" refid="sec.310" target.guid="_5c7461ea-75bf-4ec5-9876-1d63143e9047">section 310</intref><intref check="valid" refid="sec.310-ssec.1" target.guid="_148aa051-4f01-485b-b155-36844ee2e479">(1)</intref><intref check="valid" refid="sec.310-ssec.1-para1.c" target.guid="_79f19c72-cc8b-4294-ae80-933ea6d9ff38">(c)</intref>;</txt></block></li><li guid="_59a2aefa-8bd9-4430-92f6-c8a56223ec51" id="sec.305-ssec.2-para1.e-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">the economic and technical viability of the concurrent or coordinated petroleum production and the development of any coal or oil shale resources in the land;</txt></block></li><li guid="_ce4af0c4-e27e-4bac-a0b5-3d17a698f8a0" id="sec.305-ssec.2-para1.e-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">the extent, nature and value of petroleum production and the development of any coal or oil shale resources in the land; and</txt></block></li></list></block></li><li guid="_8924243f-dc27-42a5-bacd-421a70725a36" id="sec.305-ssec.2-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">the public interest in petroleum production from, and the development of any coal or oil shale resources in, the land, having regard to the public interest.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_af2dcca0-94cb-45eb-88a9-d19bb338aaaf" id="sec.305-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The proposed development plan included in the application must also comply with <intref check="valid" refid="ch.3-pt.6" target.guid="_125342c0-5c01-4b66-ba95-a4209c82febf">part 6</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3015ef08-e9ea-42a5-ba7b-06369abb9aa7" id="sec.306" provision.type="other" spent.amends="0"><no>306</no><heading guid="_80352ff0-47b9-4e63-a717-f68de2d7200e" id="sec.306-he">Content requirements for CSG statement</heading><subclause affected.by.uncommenced="0" guid="_aa3b4eb6-ae81-42c7-9602-23697b424533" id="sec.306-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A CSG statement must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e6097931-b0b2-4529-85a9-3fa9b674e1da" id="sec.306-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">assess—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e805055f-e813-470d-af9c-f9c6490872c0" id="sec.306-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the likely effect of proposed petroleum production on the future development of coal or oil shale resources from the land; and</txt></block></li><li guid="_4fff2013-a7ea-4ea0-96e5-95b51aeb207d" id="sec.306-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the technical and commercial feasibility of coordinated petroleum production and coal or oil shale mining from the land; and</txt></block></li></list></block></li><li guid="_5d28d428-5180-4936-b964-e3705f27ec11" id="sec.306-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">include an overview of a proposed safety management system for all operating plant, or proposed operating plant, for proposed petroleum production under the lease that may affect possible future safe and efficient mining under a coal or oil shale mining lease.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_01211606-8e56-4dc7-bc38-ae12525d9aaf" id="sec.306-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The proposed safety management system must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d92aac1b-afa1-4321-89b4-d6bbeff4e2b4" id="sec.306-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for activities of the plant that may affect future safe and efficient mining of coal, comply with the requirements under <intref check="valid" refid="sec.675" target.guid="_28bc8c66-267c-4d67-9a55-97f681bdb4b3">sections 675</intref> and <intref check="valid" refid="sec.705C" target.guid="_0d8ca067-2468-476e-810e-9f48381c0f9b">705C</intref> for a safety management system; and</txt></block></li><li guid="_19773a1c-bf47-482c-9cb1-7f3df0031270" id="sec.306-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">include proposals for the minimisation of potential adverse effects on possible future safe and efficient mining under a future mining lease.</txt></block></li></list></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_3fdc47f2-2435-4597-b0ff-f11dd51cdd4f" id="ch.3-pt.2-div.1-sdiv.3"><no>Subdivision 3</no><heading guid="_3bdd07c4-8ea7-4a48-b5b4-09a395e6f3f8" id="ch.3-pt.2-div.1-sdiv.3-he">Provisions for applications in particular circumstances</heading><clause affected.by.uncommenced="0" guid="_ce42d819-db32-4cee-b58c-32b76ae7631f" id="sec.307" provision.type="other" spent.amends="0"><no>307</no><heading guid="_b4f8fed9-d585-419c-a1d0-f3c44e7ce0e9" id="sec.307-he">Applications relating to exploration tenement and mining lease not held by same person</heading><subclause affected.by.uncommenced="0" guid="_d73d1b59-54dd-4794-8113-d56393c29908" id="sec.307-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a person to whom this division applies wishes to make an application to which this division applies—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8898a776-01c8-475c-be2a-aa8f55f32a47" id="sec.307-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for land in the area of each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fdf040c4-ea6b-496e-af17-fdc0ff3d0ac5" id="sec.307-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the coal or oil shale exploration tenement (the <defterm guid="_fa37b78e-7903-43f2-954b-9a51f6cef4c1" id="sec.307-ssec.1-para1.a-def.explorationtenementpart" type="definition">exploration tenement part</defterm>);</txt></block></li><li guid="_e078d7c7-ee47-4d39-a978-f765f4c3e225" id="sec.307-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a coal or oil shale mining lease (the <defterm guid="_fb1f658a-d973-45c5-8e11-15904080eee5" id="sec.307-ssec.1-para1.a-def.miningleasepart" type="definition">mining lease part</defterm>); and</txt></block></li></list></block></li><li guid="_753f3fa1-9508-4044-a7ec-c2374bddc665" id="sec.307-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the exploration tenement and the mining lease are not held by the same person.</txt></block></li></list><note guid="_3edb281c-324e-4b00-b1c0-9f395f3a9133" id="sec.307-ssec.1-note" type="example"><heading guid="_a479fca6-f8cc-43e2-ad2b-172a7329b97f" id="sec.307-ssec.1-note-he">Note—</heading><block><txt break.before="1">If the coal or oil shale exploration tenement and the coal or oil shale mining lease are held by the same person, see <intref check="valid" refid="sec.344" target.guid="_de85f9f9-1055-4925-8798-60a63a2a7391">section 344</intref><intref check="valid" refid="sec.344-ssec.3" target.guid="_5b74d89c-88c3-41eb-8155-287cdf555520">(3)</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_35b04bba-721c-4f56-a28d-c103f4d4ea8f" id="sec.307-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The person may make separate ATP-related applications for the exploration tenement part and the mining lease part.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_70bb95c5-1a98-45cf-a0a3-11f2b1bae424" id="sec.307-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A separate application for the exploration tenement part, or the part of an application that relates to the exploration tenement part, must be decided under this division.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_38a72d67-e68e-4b69-8803-cad0f8648d91" id="sec.307-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A separate application for the mining lease part, or the part of an application that relates to the mining lease part, must be decided under <intref check="valid" refid="ch.3-pt.3" target.guid="_e9bc49f9-3a04-49d3-b854-498473bad865">part 3</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e32528dc-9f3a-496c-b7b3-2127952364f6" id="sec.308" provision.type="other" spent.amends="0"><no>308</no><heading guid="_246fcf6a-34a0-4971-8ac3-ec41350a6dff" id="sec.308-he">Applications relating to other land</heading><subclause affected.by.uncommenced="0" guid="_2e767176-5ee5-4469-a265-0ac459e2d2f0" id="sec.308-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_91bd8084-662a-4c29-8fc3-282608c40e95" id="sec.308-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a person to whom this division applies wishes to make an application to which this division applies; and</txt></block></li><li guid="_69f10e23-01ff-40a4-9116-a1e994ee2359" id="sec.308-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the proposed application includes land (the <defterm guid="_0c89e2aa-ac1c-4963-98b0-345b8d874494" id="sec.308-ssec.1-def.otherpart" type="definition">other part</defterm>) not in the area of a coal or oil shale mining tenement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b0b14d0a-257d-42b5-b9d6-e42a161fbe7c" id="sec.308-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The person may lodge a separate ATP-related application for the other part.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_13200f66-559a-4730-8615-a6fe96148167" id="sec.308-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A separate application for the other part, or the part of an application that relates to the other part, must be decided under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_17ac5198-fde3-47e1-ac5e-c4718ede2a77" id="ch.3-pt.2-div.1-sdiv.4"><no>Subdivision 4</no><heading guid="_ed0c7254-ca88-454e-9fc8-776808965b34" id="ch.3-pt.2-div.1-sdiv.4-he">Obligations of applicant and coal or oil shale exploration tenement holder</heading><clause affected.by.uncommenced="0" guid="_5c7461ea-75bf-4ec5-9876-1d63143e9047" id="sec.310" provision.type="other" spent.amends="0"><no>310</no><heading guid="_3a10acc1-1148-45d7-9d8e-05e131ee4759" id="sec.310-he">Applicant’s obligations</heading><subclause affected.by.uncommenced="0" guid="_148aa051-4f01-485b-b155-36844ee2e479" id="sec.310-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The applicant must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_730899b0-c855-428f-8163-3cc581f96652" id="sec.310-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">within 10 business days after making the ATP-related application, give the coal or oil shale exploration tenement holder a copy of the application, other than any part of the application that relates to the capability criteria; and</txt></block></li><li guid="_3c31ab2e-3ea4-4a52-af72-19dc0971f964" id="sec.310-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">use reasonable attempts to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_46ec86b9-7420-4a24-90a9-648d49bea3f4" id="sec.310-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">consult with the tenement holder about the applicant’s proposed development plan and proposed safety management system; and</txt></block></li><li guid="_d8d18d10-2a7f-4115-b3fe-ec83f5f84c7a" id="sec.310-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">make an appropriate arrangement with the tenement holder about advanced testing carried out, or proposed to be carried out, by the tenement holder (a <defterm guid="_0a309e7d-4e38-4fb8-82e8-70d68c955973" id="sec.310-ssec.1-para1.b-def.testingarrangement" type="definition">testing arrangement</defterm>); and</txt><note guid="_d113db4d-6584-4483-8936-84c26b7fc105" id="sec.310-ssec.1-para1.b-para2.ii-note" type="example"><heading guid="_cb371c13-e4b4-40b1-86fa-88eea658b37a" id="sec.310-ssec.1-para1.b-para2.ii-note-he">Example of advanced testing—</heading><block><txt break.before="1">bulk sampling</txt></block></note></block></li></list><note guid="_b5fe7e81-e644-4bfd-922c-8eed37d16f6d" id="sec.310-ssec.1-para1.b-note" type="example"><heading guid="_6d2f21b6-25f3-4c06-914e-5baf74ab9ab3" id="sec.310-ssec.1-para1.b-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="ch.3-pt.8" target.guid="_7848573e-9ea5-49cb-a174-595b65c98b82">part 8</intref> (Confidentiality of information).</txt></block></note></block></li><li guid="_79f19c72-cc8b-4294-ae80-933ea6d9ff38" id="sec.310-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">change the proposed plan or system to give effect to any reasonable proposal by the tenement holder that will optimise the safe and efficient production of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8bcf7232-bb83-4052-96c1-aaf6e9fa32ba" id="sec.310-ssec.1-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">petroleum under the proposed petroleum lease; and</txt></block></li><li guid="_ae0c70a4-037e-43fc-a715-6ce129bea46c" id="sec.310-ssec.1-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">coal or oil shale under any future mining lease over the land; and</txt></block></li></list></block></li><li guid="_3aa53834-d2ba-4a37-9b8c-1fc70f90bffc" id="sec.310-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">within 4 months after the making of the application, lodge a notice stating each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4594ae87-2a84-4173-a4d5-8c946d95a357" id="sec.310-ssec.1-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the details of the consultation;</txt></block></li><li guid="_f754ebb8-97ab-4eb2-9ac6-b62cbfc15f20" id="sec.310-ssec.1-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the results of the consultation;</txt></block></li><li guid="_a1b79a0b-e02b-42b4-8958-e24aa03d97cc" id="sec.310-ssec.1-para1.d-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">any comments the applicant wishes to make about any submissions lodged by the tenement holder, under <intref check="valid" refid="sec.314" target.guid="_59e51d7e-3865-4a05-9438-464af9977aa7">section 314</intref>;</txt></block></li><li guid="_ed16fef9-08ae-4489-a8ed-fd5b7ca100b2" id="sec.310-ssec.1-para1.d-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">any changes to the proposed development plan or proposed safety management system;</txt></block></li><li guid="_f0bde37f-e9de-4818-905d-fc321c00491f" id="sec.310-ssec.1-para1.d-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">if a testing arrangement has been made—details of the arrangement;</txt></block></li><li guid="_f04ce206-7e80-4cdd-85ce-54b203f52bd4" id="sec.310-ssec.1-para1.d-para2.vi" provision.type="other"><no>(vi)</no><block><txt break.before="0">if a testing arrangement has not been made—details of the attempts made to make a testing arrangement;</txt></block></li><li guid="_d683a549-0347-4ad2-aa3b-eaec8f774563" id="sec.310-ssec.1-para1.d-para2.vii" provision.type="other"><no>(vii)</no><block><txt break.before="0">the applicant’s assessment of the potential for the applicant and the tenement holder to make a coordination arrangement about—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_95dba3c3-b2bc-41a6-8b47-55b3f3ddbdb8" id="sec.310-ssec.1-para1.d-para2.vii-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">petroleum production under the proposed petroleum lease; and</txt></block></li><li guid="_a6ba7010-ac9f-4636-a4c9-548708663e99" id="sec.310-ssec.1-para1.d-para2.vii-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">coal or oil shale mining and any incidental coal seam gas mining under any future mining lease over the land.</txt></block></li></list></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_121ad120-8557-45f0-bf63-49402ed20fac" id="sec.310-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the obligations under <intref check="valid" refid="sec.310-ssec.1" target.guid="_148aa051-4f01-485b-b155-36844ee2e479">subsection (1)</intref><intref check="valid" refid="sec.310-ssec.1-para1.b" target.guid="_3c31ab2e-3ea4-4a52-af72-19dc0971f964">(b)</intref><intref check="valid" refid="sec.310-ssec.1-para1.b-para2.ii" target.guid="_d8d18d10-2a7f-4115-b3fe-ec83f5f84c7a">(ii)</intref> and (c) apply only to the extent the provisions or arrangement are commercially and technically feasible for the applicant.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_300d7f8b-e19c-4bbc-afb9-d37d4176b5c5" id="sec.310-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For <intref check="valid" refid="sec.310-ssec.1" target.guid="_148aa051-4f01-485b-b155-36844ee2e479">subsection (1)</intref><intref check="valid" refid="sec.310-ssec.1-para1.b" target.guid="_3c31ab2e-3ea4-4a52-af72-19dc0971f964">(b)</intref><intref check="valid" refid="sec.310-ssec.1-para1.b-para2.ii" target.guid="_d8d18d10-2a7f-4115-b3fe-ec83f5f84c7a">(ii)</intref>, if the exploration tenement is an exploration permit, it is appropriate for the agreement to give the permit holder the right to carry out advanced testing to satisfy the Minister under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.186" target.doc.id="act-1989-110" target.guid="_d2ce6898-be07-4a5d-a2a2-b658ce3d7628" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 186</legref><legref check="invalid" jurisd="QLD" type="act">(6)</legref><legref check="invalid" jurisd="QLD" type="act">(a)</legref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e66f315e-a1d9-4fe9-9430-d1b2a2b5e534" id="sec.310-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.310-ssec.3" target.guid="_300d7f8b-e19c-4bbc-afb9-d37d4176b5c5">subsection (3)</intref> does not require the applicant to agree to testing having a duration of more than 12 months.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_45b7990d-5bee-4b8f-bdd3-e73ab90f6e6d" id="sec.311" provision.type="other" spent.amends="0"><no>311</no><heading guid="_13f07ea9-eb05-4d7f-bda2-a5ffa8219cab" id="sec.311-he">Minister may require further negotiation</heading><subclause affected.by.uncommenced="0" guid="_f1040be2-d2ae-492d-bb51-dc3b8e0d258c" id="sec.311-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may, after receiving the notice under <intref check="valid" refid="sec.310" target.guid="_5c7461ea-75bf-4ec5-9876-1d63143e9047">section 310</intref><intref check="valid" refid="sec.310-ssec.1" target.guid="_148aa051-4f01-485b-b155-36844ee2e479">(1)</intref><intref check="valid" refid="sec.310-ssec.1-para1.d" target.guid="_3aa53834-d2ba-4a37-9b8c-1fc70f90bffc">(d)</intref>, require the applicant to conduct negotiations with the coal or oil shale exploration tenement holder with a view to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_caf10d7f-3114-4b3e-9d47-5e2dfa8623e9" id="sec.311-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">making a testing arrangement mentioned in <intref check="valid" refid="sec.310" target.guid="_5c7461ea-75bf-4ec5-9876-1d63143e9047">section 310</intref><intref check="valid" refid="sec.310-ssec.1" target.guid="_148aa051-4f01-485b-b155-36844ee2e479">(1)</intref><intref check="valid" refid="sec.310-ssec.1-para1.b" target.guid="_3c31ab2e-3ea4-4a52-af72-19dc0971f964">(b)</intref><intref check="valid" refid="sec.310-ssec.1-para1.b-para2.ii" target.guid="_d8d18d10-2a7f-4115-b3fe-ec83f5f84c7a">(ii)</intref>; or</txt></block></li><li guid="_ff604a60-8b23-4c43-9797-7a6002f03ab1" id="sec.311-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">making changes of a type mentioned in <intref check="valid" refid="sec.310" target.guid="_5c7461ea-75bf-4ec5-9876-1d63143e9047">section 310</intref><intref check="valid" refid="sec.310-ssec.1" target.guid="_148aa051-4f01-485b-b155-36844ee2e479">(1)</intref><intref check="valid" refid="sec.310-ssec.1-para1.c" target.guid="_79f19c72-cc8b-4294-ae80-933ea6d9ff38">(c)</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b92017dc-1f33-4af5-a4d8-54aa91cef058" id="sec.311-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The applicant must use all reasonable attempts to comply with the requirement.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_6a038d2f-c41f-41d5-af20-9b3c9fc2d63f" id="sec.312" provision.type="other" spent.amends="0"><no>312</no><heading guid="_49e64d94-f86e-4062-a746-e86048c00e43" id="sec.312-he">Consequence of applicant not complying with obligations or requirement</heading><block><txt break.before="1">If the Minister is reasonably satisfied the applicant has not complied with an obligation under <intref check="valid" refid="sec.310" target.guid="_5c7461ea-75bf-4ec5-9876-1d63143e9047">section 310</intref> or <intref check="valid" refid="sec.311" target.guid="_45b7990d-5bee-4b8f-bdd3-e73ab90f6e6d">311</intref>, the ATP-related application may be refused.</txt></block></clause><clause affected.by.uncommenced="0" guid="_d0f7f8a9-32db-446f-a486-3314ab6e2483" id="sec.313" provision.type="other" spent.amends="0"><no>313</no><heading guid="_a61a9bae-6bc1-4ffb-832f-1a994b9bfbe9" id="sec.313-he">Obligations of coal or oil shale exploration tenement holder</heading><block><txt break.before="1">The coal or oil shale exploration tenement holder must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9041b8ec-3a96-40ca-8b3d-166f4c7f5ba1" id="sec.313-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">within 20 business days after receiving a copy of the application, give the applicant basic information the tenement holder has about the following that the applicant may reasonably need to comply with <intref check="valid" refid="sec.305" target.guid="_f8a0d070-7bc2-4125-8d40-9e466d7983f8">sections 305</intref>, <intref check="valid" refid="sec.306" target.guid="_3015ef08-e9ea-42a5-ba7b-06369abb9aa7">306</intref> and <intref check="valid" refid="sec.310" target.guid="_5c7461ea-75bf-4ec5-9876-1d63143e9047">310</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dc81fc40-0f5f-45e9-b822-80e3f400d528" id="sec.313-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the type of exploration activities carried out, or proposed to be carried out under the tenement;</txt></block></li><li guid="_6cc4abc0-a35c-4d0d-bc95-95d1dadd5224" id="sec.313-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">coal or oil shale resources in the land; and</txt></block></li></list></block></li><li guid="_a5f8ae27-b1f9-48ad-b1de-b08186abe618" id="sec.313-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">after receiving a copy of the ATP-related application, make reasonable attempts to reach an agreement with the applicant about the matters mentioned in <intref check="valid" refid="sec.310" target.guid="_5c7461ea-75bf-4ec5-9876-1d63143e9047">section 310</intref><intref check="valid" refid="sec.310-ssec.1" target.guid="_148aa051-4f01-485b-b155-36844ee2e479">(1)</intref><intref check="valid" refid="sec.310-ssec.1-para1.b" target.guid="_3c31ab2e-3ea4-4a52-af72-19dc0971f964">(b)</intref> that provides the best resource use outcome without significantly affecting the parties’ rights or interests.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_59e51d7e-3865-4a05-9438-464af9977aa7" id="sec.314" provision.type="other" spent.amends="0"><no>314</no><heading guid="_13282438-6bb9-4ed3-a884-21df7fe768c1" id="sec.314-he">Submissions by coal or oil shale exploration tenement holder</heading><subclause affected.by.uncommenced="0" guid="_7eb7837a-ac4f-4e1f-9e9b-8f5c377d1122" id="sec.314-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The coal or oil shale exploration tenement holder may lodge submissions about the ATP-related application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_76afe465-1dd6-49a1-b9b0-e097c1a77f25" id="sec.314-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the submissions may be lodged only within 3 months after the holder is, under <intref check="valid" refid="sec.310" target.guid="_5c7461ea-75bf-4ec5-9876-1d63143e9047">section 310</intref><intref check="valid" refid="sec.310-ssec.1" target.guid="_148aa051-4f01-485b-b155-36844ee2e479">(1)</intref><intref check="valid" refid="sec.310-ssec.1-para1.a" target.guid="_730899b0-c855-428f-8163-3cc581f96652">(a)</intref>, given a copy of the application (the <defterm guid="_fc14d254-5891-4bf4-8456-a703a3fca160" id="sec.314-def.submissionperiod" type="definition">submission period</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ac913a8d-fdde-4578-ac98-cf6bd65209e8" id="sec.314-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The submissions may—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_747cdb73-fd46-42a5-9144-cfe5f0d4c57d" id="sec.314-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">state that the holder does not object to the granting of the proposed petroleum lease; and</txt></block></li><li guid="_96cc6edf-344c-4248-b301-c19644db63ea" id="sec.314-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state that the holder does not wish any preference for the future development of coal or oil shale from the land (<defterm guid="_e44619f9-0336-4b87-8cc6-2f48624b388f" id="sec.314-ssec.3-def.coaloroilshaledevelopmentpreference" type="definition">coal or oil shale development preference</defterm>); and</txt></block></li><li guid="_be4fb5e5-cede-4e55-a49f-eb9c6994aefb" id="sec.314-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">include information about all or any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_59129c23-76a0-42db-9f95-4a7f91f8cb47" id="sec.314-ssec.3-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">exploration carried out under the tenement;</txt></block></li><li guid="_436df054-ee06-4436-ae79-076b31d4ea8f" id="sec.314-ssec.3-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the results of the exploration;</txt></block></li><li guid="_4e7b38a5-cdc8-437e-b072-0e13db18aafb" id="sec.314-ssec.3-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the prospects for future coal or oil shale mining or incidental coal seam gas mining from the land; and</txt></block></li></list></block></li><li guid="_f3e584da-2973-4191-8fab-b5decbe03fec" id="sec.314-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">include a proposal by the tenement holder for the development of coal or oil shale in the land; and</txt></block></li><li guid="_6ee1a38c-f682-411d-a121-4f0d460cb071" id="sec.314-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">include information relevant to the CSG assessment criteria; and</txt></block></li><li guid="_43de457a-8af0-40ab-b010-0e292f857a0d" id="sec.314-ssec.3-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">include reasonable provisions for the safety management system for petroleum production under the petroleum lease.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8a53d1b1-8c4b-4e0b-8bb0-bffdc11e1ae3" id="sec.314-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The holder must give the applicant a copy of the submissions.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e0f50c7f-478e-4d18-b446-568d6d352242" id="sec.314-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In deciding the ATP-related application, regard must be had to the submissions.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_f1ca2821-2d71-4d3f-a4e2-d3d8dbb3da17" id="ch.3-pt.2-div.1-sdiv.5"><no>Subdivision 5</no><heading guid="_1709df68-f82c-49fb-983c-e8c4c82d9e16" id="ch.3-pt.2-div.1-sdiv.5-he">Priority for earlier coal or oil shale mining lease application or proposed application</heading><clause affected.by.uncommenced="0" guid="_607795b9-3e80-4a25-a902-a1b3abac3ace" id="sec.315" provision.type="other" spent.amends="0"><no>315</no><heading guid="_e4111ba3-bab4-40f0-8dbd-f4abecc62722" id="sec.315-he">Earlier coal or oil shale mining lease application</heading><subclause affected.by.uncommenced="0" guid="_5de59d3b-2a3e-40f5-9464-752f92e737d3" id="sec.315-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The ATP-related application must not be decided if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bb195811-9249-4b0f-89a9-c7360ac27f44" id="sec.315-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before the making of the ATP-related application, a coal or oil shale mining lease application was made for the land; and</txt></block></li><li guid="_b5b8bb93-01c3-4efc-973f-f264f29c0cec" id="sec.315-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the mining lease application complies with the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.245" target.doc.id="act-1989-110" target.guid="_cc638d23-7e32-467a-b445-6aeb0e8ffabf" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">sections 245</legref> and <legref check="valid" jurisd="QLD" refid="sec.246" target.doc.id="act-1989-110" target.guid="_d15b3a6e-e98d-40fe-9bbe-14b0ac2669cb" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">246</legref>, and any relevant provision of <legref check="valid" jurisd="QLD" refid="ch.8" target.doc.id="act-1989-110" target.guid="_6ec7482d-90fc-40bc-9086-d5a2470454fe" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">chapter 8</legref> of that Act; and</txt></block></li><li guid="_b8b8e375-8557-4470-b6a6-0d628c9aa3a4" id="sec.315-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the mining lease application has not been decided.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e107ab44-7be4-4f0e-a350-e76f5861697a" id="sec.315-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.315-ssec.1" target.guid="_5de59d3b-2a3e-40f5-9464-752f92e737d3">subsection (1)</intref> does not apply if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_524074f3-1d23-4039-ae99-1a59669856ad" id="sec.315-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the ATP-related application was made in response to an invitation in a notice given under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.318BG" target.doc.id="act-1989-110" target.guid="_28fabf94-678f-4d0c-9c61-120101c49d71" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 318BG</legref> and the application was made within 6 months after the giving of the notice; or</txt></block></li><li guid="_b2550d92-5e11-4f95-866c-f670d2330cd2" id="sec.315-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the coal or oil shale mining lease applicant has given written consent to the petroleum lease application.</txt></block></li></list><note guid="_0926c46a-7e30-4ad8-a512-edd3f5edbf2d" id="sec.315-ssec.2-note" type="example"><heading guid="_a5792fc7-a47a-4bdc-803d-c9f782db7fff" id="sec.315-ssec.2-note-he">Note—</heading><block><txt break.before="1">See however the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.8" target.doc.id="act-1989-110" target.guid="_6ec7482d-90fc-40bc-9086-d5a2470454fe" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">chapter 8</legref>, <legref check="valid" jurisd="QLD" refid="ch.8-pt.4" target.doc.id="act-1989-110" target.guid="_4ec0388c-2b43-41da-999a-7cd035c7d88d" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">part 4</legref> (Coal mining lease and oil shale mining lease applications in response to Petroleum and Gas (Production and Safety) Act preference decision).</txt></block><block><txt break.before="1">See also the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.318AY" target.doc.id="act-1989-110" target.guid="_b6c1de53-8276-4595-a2b3-98f2e8e76052" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 318AY</legref> (Earlier petroleum lease application).</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b3d23886-3616-4238-afbb-b1c065ada1fd" id="sec.316" provision.type="other" spent.amends="0"><no>316</no><heading guid="_c60cdb93-1c0c-45eb-8777-97767df5f24c" id="sec.316-he">Proposed coal or oil shale mining lease for which EIS approval given</heading><subclause affected.by.uncommenced="0" guid="_81f50d57-8e9f-49db-924f-8b1aa0e6535f" id="sec.316-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The ATP-related application must not be decided if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_76e475ae-a8ce-46ca-8e2c-a5f7577802f4" id="sec.316-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before the making of the ATP-related application, an approval under the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act"><name emphasis="no">Environmental Protection Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-1994-062" target.guid="_15fc0bc3-a060-4f70-84e5-3e5a03d6720f" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act">chapter 3</legref>, <legref check="valid" jurisd="QLD" refid="ch.3-pt.2" target.doc.id="act-1994-062" target.guid="_62f60fc4-9df9-4dd5-b38d-a9fb23557f01" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act">part 2</legref>, was granted for the voluntary preparation of an EIS for a project that is, or includes, a proposed coal or oil shale mining lease mining lease for the land; and</txt></block></li><li guid="_dcc9c3d8-3826-44e1-a3c4-99e13a607826" id="sec.316-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the proponent for the EIS—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_10b42690-b555-442f-b9a1-a16ba2b04851" id="sec.316-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">is, or includes, the coal or oil shale exploration tenement holder; or</txt></block></li><li guid="_aecf53bc-7b2d-4f72-87f5-0926f5c2cb05" id="sec.316-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">is someone else who has the tenement holder’s consent.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9c1e2cd6-9489-4efd-afdb-ed52b1a5cfea" id="sec.316-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.316-ssec.1" target.guid="_81f50d57-8e9f-49db-924f-8b1aa0e6535f">subsection (1)</intref> ceases to apply if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8531b40b-7a39-4b06-9bf7-05eb51074736" id="sec.316-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the proponent of the EIS does not make a coal or oil shale mining lease application for the land within 1 year after the granting of the approval; or</txt></block></li><li guid="_4c401eb3-f753-4e72-9149-f6d61b6b08de" id="sec.316-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a coal or oil shale mining lease application is made for the land within the period mentioned in <intref check="valid" refid="sec.316-ssec.2-para1.a" target.guid="_8531b40b-7a39-4b06-9bf7-05eb51074736">paragraph (a)</intref> and—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6338f63d-4107-4e57-ae37-6e5d962d5075" id="sec.316-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">it does not comply with the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.245" target.doc.id="act-1989-110" target.guid="_cc638d23-7e32-467a-b445-6aeb0e8ffabf" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">sections 245</legref> and <legref check="valid" jurisd="QLD" refid="sec.246" target.doc.id="act-1989-110" target.guid="_d15b3a6e-e98d-40fe-9bbe-14b0ac2669cb" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">246</legref>, and any relevant provision of <legref check="valid" jurisd="QLD" refid="ch.8" target.doc.id="act-1989-110" target.guid="_6ec7482d-90fc-40bc-9086-d5a2470454fe" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">chapter 8</legref> of that Act; or</txt></block></li><li guid="_1b24acb5-1c6d-4544-9b60-b6ccf63b3005" id="sec.316-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">it is decided; or</txt></block></li></list></block></li><li guid="_6d20913e-3f43-483f-9863-8e6488b19a3c" id="sec.316-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the proponent for the EIS has given written consent to the petroleum lease application.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e44c4300-e090-4242-bd2e-d1e95af4c413" id="sec.317" provision.type="other" spent.amends="0"><no>317</no><heading guid="_8eb77191-0033-4670-9c8d-cb3c68b84394" id="sec.317-he">Proposed mining lease declared a coordinated project</heading><subclause affected.by.uncommenced="0" guid="_98abdd59-6fc1-4db6-bcc7-b3877691f532" id="sec.317-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The ATP-related application must not be decided if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f1999f6b-d250-47cc-b37a-c6cb8d9607d3" id="sec.317-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before the making of the ATP-related application, a coordinated project is declared for a proposed coal or oil shale mining lease for the land; and</txt></block></li><li guid="_d70b0485-13f1-43f0-a497-c53ee2091d2c" id="sec.317-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the proponent for the coordinated project—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1ee4a38c-6ebd-4676-a8e7-6f945e15c01e" id="sec.317-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">is, or includes, the coal or oil shale exploration tenement holder; or</txt></block></li><li guid="_f7aa7ba1-6392-45d5-8907-23643c72b88a" id="sec.317-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">is someone else who has the tenement holder’s consent.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_66e59042-e4e5-4215-af6e-420a22cbf3fe" id="sec.317-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.317-ssec.1" target.guid="_98abdd59-6fc1-4db6-bcc7-b3877691f532">subsection (1)</intref> ceases to apply if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6a1674ac-f37c-4d91-8a34-60ee7f8f1375" id="sec.317-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the proponent of the coordinated project does not make a coal or oil shale mining lease application for the land within 1 year after the making of the declaration; or</txt></block></li><li guid="_cfead7f9-2f10-4f94-994e-78a7a25b2ae3" id="sec.317-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a coal or oil shale mining lease application is made for the land within the period mentioned in <intref check="valid" refid="sec.317-ssec.2-para1.a" target.guid="_6a1674ac-f37c-4d91-8a34-60ee7f8f1375">paragraph (a)</intref> and—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8bc4160d-d52c-40e9-9b4d-7c829ef51b4e" id="sec.317-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">it does not comply with the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.245" target.doc.id="act-1989-110" target.guid="_cc638d23-7e32-467a-b445-6aeb0e8ffabf" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">sections 245</legref> and <legref check="valid" jurisd="QLD" refid="sec.246" target.doc.id="act-1989-110" target.guid="_d15b3a6e-e98d-40fe-9bbe-14b0ac2669cb" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">246</legref>, and any relevant provision of <legref check="valid" jurisd="QLD" refid="ch.8" target.doc.id="act-1989-110" target.guid="_6ec7482d-90fc-40bc-9086-d5a2470454fe" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">chapter 8</legref> of that Act; or</txt></block></li><li guid="_e5683f46-8486-433d-8e13-969830dfd392" id="sec.317-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">it is decided.</txt></block></li></list></block></li><li guid="_b0982b82-973b-4068-af09-d1872d979f6b" id="sec.317-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the proponent of the coordinated project has given written consent to the <del xml:space="preserve">mining</del><ins xml:space="preserve">petroleum</ins> lease application.</txt></block></li></list></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_5b2cf256-ca69-4c7e-98e5-cba1f16843e2" id="ch.3-pt.2-div.1-sdiv.6"><no>Subdivision 6</no><heading guid="_77c97137-fa54-4591-8f88-1481b8f27d31" id="ch.3-pt.2-div.1-sdiv.6-he">Ministerial decision about whether to give any preference to development of coal or oil shale resources</heading><clause affected.by.uncommenced="0" guid="_46fe5f25-c9ce-4400-a47f-ce9b095766a7" id="sec.318" provision.type="other" spent.amends="0"><no>318</no><heading guid="_35a25457-ee57-4386-ba78-b2c69ccd8fcf" id="sec.318-he">When preference decision is required</heading><subclause affected.by.uncommenced="0" guid="_45bef85a-7474-4a27-afcf-c346c437b778" id="sec.318-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This subdivision applies for the application only if the Minister is satisfied of each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_eb62bf61-394f-4e24-8881-70407e035785" id="sec.318-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">there is a resource or reserve (the <defterm guid="_e115c6b5-3597-47a0-9822-dfbe6c8b3c37" id="sec.318-ssec.1-def.deposit" type="definition">deposit</defterm>) of coal or oil shale in the land;</txt></block></li><li guid="_be6fb533-d248-40c8-9012-c0965cea70c3" id="sec.318-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the deposit has been identified under the relevant code;</txt></block></li><li guid="_b11e560f-6dc3-430e-8c06-f6c0b7144d21" id="sec.318-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">there is the level of knowledge about the deposit, as prescribed under a regulation;</txt></block></li><li guid="_454701b8-dd46-4857-a020-68c1936c0bf7" id="sec.318-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the location, quantity, quality, geological characteristics and continuity of the deposit are known, or have been estimated or interpreted, from specific geological evidence and knowledge;</txt></block></li><li guid="_cfeaf771-b4b0-4725-8ddd-a3a2f17eac88" id="sec.318-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">there are reasonable prospects for the eventual economic mining of the deposit.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f73b88d0-09e5-497f-add7-6973b5cdb3f5" id="sec.318-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, this subdivision does not apply if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3416cb86-611d-4102-8a85-2442ddcfd3c8" id="sec.318-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the coal or oil shale exploration tenement holder has not complied with <intref check="valid" refid="sec.313" target.guid="_d0f7f8a9-32db-446f-a486-3314ab6e2483">section 313</intref><intref check="valid" refid="sec.313-para1.a" target.guid="_9041b8ec-3a96-40ca-8b3d-166f4c7f5ba1">(a)</intref>; or</txt></block></li><li guid="_887e4c50-ade8-4ebe-9750-43e61d2cf450" id="sec.318-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the tenement holder has, under <intref check="valid" refid="sec.314" target.guid="_59e51d7e-3865-4a05-9438-464af9977aa7">section 314</intref>, lodged a submission stating that the holder does not wish any coal or oil shale development preference for the land; or</txt></block></li><li guid="_13da1333-07d6-48c4-a24b-449f6686d45c" id="sec.318-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the tenement holder has not lodged any submission under <intref check="valid" refid="sec.314" target.guid="_59e51d7e-3865-4a05-9438-464af9977aa7">section 314</intref> within the submission period.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_743b61ae-dbe5-4280-bbbd-db9531ffc6d7" id="sec.318-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the Minister decides that the Minister is not satisfied as mentioned in <intref check="valid" refid="sec.318-ssec.1" target.guid="_45bef85a-7474-4a27-afcf-c346c437b778">subsection (1)</intref>, the tenement holder must be given notice of the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f78d1682-6f48-4e36-a8b5-8372901684ba" id="sec.318-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_df980eb3-43f9-4eaf-9f73-bdf8f051156c" id="sec.318-ssec.4-def.relevantcode_"><txt break.before="1"><defterm guid="_c94a2432-e048-4e05-83a4-be596b32e605" id="sec.318-ssec.4-def.relevantcode" type="definition">relevant code</defterm> means any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_641d3dc1-b569-4f62-abff-d670b08f0748" id="sec.318-ssec.4-def.relevantcode-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the document called ‘Australasian Code for Reporting of Mineral Resources and Ore Reserves (The JORC Code)’ and incorporated guidelines, published by the Joint Ore Reserves Committee of the Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia (<defterm guid="_c8c864e0-5cda-4dee-a551-142f7f057571" id="sec.318-ssec.4-def.relevantcode-def.JORC" type="definition">JORC</defterm>), as amended and published from time to time;</txt></block></li><li guid="_5f6b63a3-fe86-49cd-89d1-f31ac4c35969" id="sec.318-ssec.4-def.relevantcode-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">another document (however called) published by JORC that amends or replaces the code mentioned in <intref check="valid" refid="sec.318-ssec.4-def.relevantcode-para1.a" target.guid="_641d3dc1-b569-4f62-abff-d670b08f0748">paragraph (a)</intref>;</txt></block></li><li guid="_2d5a31f4-e41c-4203-b9e1-a75b7ebad83a" id="sec.318-ssec.4-def.relevantcode-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if a document mentioned in <intref check="valid" refid="sec.318-ssec.4-def.relevantcode-para1.a" target.guid="_641d3dc1-b569-4f62-abff-d670b08f0748">paragraph (a)</intref> or <intref check="valid" refid="sec.318-ssec.4-def.relevantcode-para1.b" target.guid="_5f6b63a3-fe86-49cd-89d1-f31ac4c35969">(b)</intref> stops being published—another similar document prescribed under a regulation.</txt></block></li></list><note guid="_6791621b-9cce-4daa-b9c3-08bd3fbf7dbb" id="sec.318-ssec.4-def.relevantcode-note" type="example"><heading guid="_f27fd2d2-afba-4cb5-b1d3-b0c33a2dfa27" id="sec.318-ssec.4-def.relevantcode-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_3f9920de-4a91-406e-8363-50e6de9cb91c" id="sec.318-ssec.4-def.relevantcode-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">If the Minister is not satisfied as mentioned in <intref check="valid" refid="sec.318-ssec.1" target.guid="_45bef85a-7474-4a27-afcf-c346c437b778">subsection (1)</intref>, the application can be decided under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>.</txt></block></li><li guid="_87fd901e-69e7-4077-821c-55d06d4d1e8c" id="sec.318-ssec.4-def.relevantcode-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">If this subdivision does not apply because of <intref check="valid" refid="sec.318-ssec.2" target.guid="_f73b88d0-09e5-497f-add7-6973b5cdb3f5">subsection (2)</intref>, the application can be decided under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref> and <intref check="valid" refid="ch.3-pt.2-div.1-sdiv.8" target.guid="_94899d5c-c840-4360-8867-03088beb8699">subdivision 8</intref>.</txt></block></li></list></block></note></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_db7da69c-4cee-411e-becc-d43793db5333" id="sec.319" provision.type="other" spent.amends="0"><no>319</no><heading guid="_7a5e1a77-27c9-4f3f-b710-6f0a8df7e98f" id="sec.319-he">Decision about whether to give any preference to development of coal or oil shale</heading><subclause affected.by.uncommenced="0" guid="_70e0bcf0-bba8-4544-9588-88635be3fd05" id="sec.319-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.320" target.guid="_377cff8e-a3b9-4912-adfa-500ed4bcde74">section 320</intref>, the Minister must decide whether to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_400fd0e6-534e-4af8-a7eb-7081f7e2eea7" id="sec.319-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">grant the petroleum lease application; or</txt></block></li><li guid="_aa8afa4e-3c89-4939-9d55-5ce618a8718f" id="sec.319-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give any coal or oil shale development preference for the land, in whole or part.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_87140eec-2e55-4239-b3b7-cfc86614fa9a" id="sec.319-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The decision under <intref check="valid" refid="sec.319-ssec.1" target.guid="_70e0bcf0-bba8-4544-9588-88635be3fd05">subsection (1)</intref> is the <defterm guid="_c8e81cb4-ba66-4fba-85d6-d917ff38f363" id="sec.319-def.preferencedecision" type="definition">preference decision</defterm>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1957ec9c-7294-4ace-85ef-ad7ba2c840be" id="sec.319-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In making the preference decision the CSG assessment criteria must be considered.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_074a06db-6d51-4e95-8a7c-3883918e9b97" id="sec.319-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If, under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.8" target.doc.id="act-1989-110" target.guid="_6ec7482d-90fc-40bc-9086-d5a2470454fe" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">chapter 8</legref>, <legref check="valid" jurisd="QLD" refid="ch.8-pt.2" target.doc.id="act-1989-110" target.guid="_f290a68c-5a61-40ee-8f92-3b2a12f36695" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">part 2</legref>, <legref check="invalid" jurisd="QLD" type="act">division 6</legref>, petroleum development preference has been given for the land, the preference decision is taken to be not to give coal or oil shale development preference for any of the land.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_377cff8e-a3b9-4912-adfa-500ed4bcde74" id="sec.320" provision.type="other" spent.amends="0"><no>320</no><heading guid="_5658f28e-6a18-4c13-bee4-57ec25de65ec" id="sec.320-he">Reference to Land Court before making preference decision</heading><subclause affected.by.uncommenced="0" guid="_ad60b3a3-27c3-43a5-86de-362c4eced3fa" id="sec.320-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Before making the preference decision—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fde63aeb-0858-4d68-a314-fcb788b163b0" id="sec.320-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the chief executive must refer the application to the Land Court for it to make recommendations to the Minister about what the preference decision should be; and</txt></block></li><li guid="_8c5067ca-cc2b-481a-9179-4f9ec80389a4" id="sec.320-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Minister must consider the recommendations.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1ccbf0de-4aed-4139-818b-4fd9ea469183" id="sec.320-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The referral must be made by filing a notice in the approved form with the registrar of the Land Court.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2b2a012f-f4a1-4073-9050-a5f734d12508" id="sec.320-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The referral starts a proceeding before the Land Court for it to make the recommendations.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6e57f83d-181b-4e51-9228-b85ecd0ef32d" id="sec.320-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The parties to the proceeding are the applicant and the coal or oil shale exploration tenement holder.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_137b1189-c8db-44b0-a3a5-47b65794a26a" id="sec.320-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In making the recommendations—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7dfa9c5c-218b-42d8-964a-5e3e66f8329e" id="sec.320-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the CSG assessment criteria must be considered; and</txt></block></li><li guid="_3eeab9e0-13ff-4567-977c-b8cff3404b00" id="sec.320-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0"><intref check="valid" refid="sec.321" target.guid="_e4db076f-c2ca-43f6-a51f-30ccf3e2e66b">section 321</intref> applies as if a reference in the section—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9d4ade6c-e78b-45b9-815e-98add4e08db3" id="sec.320-ssec.5-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">to the Minister were a reference to the Land Court; and</txt></block></li><li guid="_f7e53355-7481-4054-a985-039ccc47c028" id="sec.320-ssec.5-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">to coal or oil shale development preference were a reference to recommending coal or oil shale development preference.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_33c5f273-8963-4ce7-9c78-8c6c758acd75" id="sec.320-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The recommendations may also include recommendations about the conditions and term of the petroleum lease.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e4db076f-c2ca-43f6-a51f-30ccf3e2e66b" id="sec.321" provision.type="other" spent.amends="0"><no>321</no><heading guid="_357028d2-d2c4-4234-bf54-6d6099f034f3" id="sec.321-he">Restrictions on giving preference</heading><subclause affected.by.uncommenced="0" guid="_6c03b32e-9b0b-4ebf-97b0-a8b5bd993ac3" id="sec.321-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Coal or oil shale development preference, in whole or part, must not be given unless this section has been complied with.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2ab52073-aa47-4b29-82ce-c459bd4db9d1" id="sec.321-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Coal or oil shale development preference may be given only if the Minister is satisfied of each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_21b9829d-344c-43d0-9c72-7fa2f88456b3" id="sec.321-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">on the basis of the submissions and the results of consultation lodged under <intref check="valid" refid="sec.310" target.guid="_5c7461ea-75bf-4ec5-9876-1d63143e9047">sections 310</intref> and <intref check="valid" refid="sec.314" target.guid="_59e51d7e-3865-4a05-9438-464af9977aa7">314</intref>, it is either not commercially or technically feasible or it is unlikely that the applicant and the coal or oil shale exploration tenement holder are able to make a future coordination arrangement about—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_40f9b4e0-7a63-47a9-9a8c-78e92ac4018b" id="sec.321-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">petroleum production under the proposed petroleum lease; and</txt></block></li><li guid="_710fe687-e419-4d5e-b45e-375a6394e81d" id="sec.321-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">coal or oil shale mining and any incidental coal seam gas mining under any future mining lease for the land;</txt></block></li></list></block></li><li guid="_89b525b9-7690-4411-98f3-80118ccc5bc3" id="sec.321-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that, having regard to the public interest, the public interest in the following would be best served by not granting a petroleum lease to the petroleum lease applicant first—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e6e61e9c-eefa-4230-9e03-958327154d1b" id="sec.321-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">petroleum production;</txt></block></li><li guid="_bee72b01-3a79-4544-bacf-e2db9955c650" id="sec.321-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">coal or oil shale mining and any incidental coal seam gas mining;</txt></block></li></list></block></li><li guid="_cab66ebe-756f-434d-a906-4b3b89bad68b" id="sec.321-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the coal or oil shale is a brownfield coal or oil shale resource—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ac1be797-68a2-48c9-82a6-044a703ee45c" id="sec.321-ssec.2-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">it is critical to the continuance of an existing mining operation or the efficient use of infrastructure related to the operation; and</txt></block></li><li guid="_e89a126c-c35f-4927-83e2-87f58da1b214" id="sec.321-ssec.2-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the applicant’s proposed development plan is incompatible with the future development of the resource;</txt></block></li></list></block></li><li guid="_fdae0a42-2359-46fb-b59d-5875a7b28cf5" id="sec.321-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">if the coal or oil shale is a greenfield coal or oil shale resource—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8febcb2a-edf5-4309-85aa-464b2d6ec7d3" id="sec.321-ssec.2-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">it is commercially viable; and</txt></block></li><li guid="_703c89d5-26ef-4160-ba74-599ac859b181" id="sec.321-ssec.2-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">coal or oil shale mining will, if a mining lease is granted to the tenement holder, start within 2 years after the grant of the lease.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3254c95b-8746-4acc-a9ae-de7603c78e46" id="sec.321-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_3af95732-8c7c-42ca-9a3f-d2040a8973b7" id="sec.321-ssec.3-def.brownfieldcoaloroilshaleresource_"><txt break.before="1"><defterm guid="_bca6500a-edfb-4718-988f-0d712f9507e7" id="sec.321-ssec.3-def.brownfieldcoaloroilshaleresource" type="definition">brownfield coal or oil shale resource</defterm> means coal or oil shale associated with, or adjacent to, an existing mining operation under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_8fabdbae-1e5f-431d-8e95-0606de6f536f" id="sec.321-ssec.3-def.greenfieldcoaloroilshaleresource_"><txt break.before="1"><defterm guid="_484bd439-b031-49e6-af31-3a848369d220" id="sec.321-ssec.3-def.greenfieldcoaloroilshaleresource" type="definition">greenfield coal or oil shale resource</defterm> means coal or oil shale that is not associated with, or adjacent to, an existing mining operation under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>.</txt></definition></deflist></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_44e36685-8865-43e8-819e-d61d45bb6809" id="ch.3-pt.2-div.1-sdiv.7"><no>Subdivision 7</no><heading guid="_ceb992d3-872d-41de-8571-b24c25354467" id="ch.3-pt.2-div.1-sdiv.7-he">Process if preference decision is to give any preference to development of coal or oil shale resources</heading><clause affected.by.uncommenced="0" guid="_93f73a01-6623-44be-bf08-23cc04e93bbf" id="sec.322" provision.type="other" spent.amends="0"><no>322</no><heading guid="_78094dd5-0d12-4c44-8a4a-a2387987376c" id="sec.322-he">Application of <intref check="valid" refid="ch.3-pt.2-div.1-sdiv.7" target.guid="_44e36685-8865-43e8-819e-d61d45bb6809">sdiv 7</intref></heading><block><txt break.before="1">This subdivision applies only if, under <intref check="valid" refid="sec.318" target.guid="_46fe5f25-c9ce-4400-a47f-ce9b095766a7">section 318</intref>, a preference decision is required and that decision was to give coal or oil shale development preference for the whole or part of the land.</txt></block></clause><clause affected.by.uncommenced="0" guid="_890340e8-daa9-48d8-9e24-3447adc0598f" id="sec.323" provision.type="other" spent.amends="0"><no>323</no><heading guid="_8c786e58-ca2b-404b-8245-eb8815db2953" id="sec.323-he">Notice to applicant and coal or oil shale exploration tenement holder</heading><subclause affected.by.uncommenced="0" guid="_f373ebc1-d3e4-4c7f-bddc-b90d1d388dec" id="sec.323-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must give the applicant and the coal or oil shale exploration tenement holder notice of the preference decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e4b95999-721b-4ec9-bf85-b8c78bb94359" id="sec.323-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must invite the tenement holder to, within 6 months after the giving of the notice (the <defterm guid="_f685cd62-a64c-462a-9789-ffbe4c114871" id="sec.323-def.miningleaseapplicationperiod" type="definition">mining lease application period</defterm>), apply for a mining lease for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4d526e87-45f0-480d-b0c1-f0072306f63f" id="sec.323-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the preference is for all of the land—all of the land; or</txt></block></li><li guid="_1706c55b-7a30-4929-af8c-72972224cc8b" id="sec.323-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the preference is for part of the land—that part.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8b445a35-b6ec-4328-9f9b-cddde923230f" id="sec.324" provision.type="other" spent.amends="0"><no>324</no><heading guid="_8a5d8239-4331-4949-b4d8-577f2c5f9de4" id="sec.324-he">Mining lease application for all of the land</heading><subclause affected.by.uncommenced="0" guid="_aa270565-9aa4-4da8-a3ed-bdebb3d75a57" id="sec.324-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the preference is for all of the land and, within the mining lease application period, the coal or oil shale exploration tenement holder applies for a mining lease for all of the land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4cfaf588-c140-4deb-9cdb-c2d8b6047ad6" id="sec.324-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A further step can not be taken to decide the ATP-related application until after the mining lease application has been decided.</txt><note guid="_b796c4c9-fe56-40c9-8dd9-6cea4f13a04a" id="sec.324-ssec.2-note" type="example"><heading guid="_c2ba1221-810b-4bdb-a508-371e1c9201f7" id="sec.324-ssec.2-note-he">Note—</heading><block><txt break.before="1">See however the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.8" target.doc.id="act-1989-110" target.guid="_6ec7482d-90fc-40bc-9086-d5a2470454fe" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">chapter 8</legref>, <legref check="valid" jurisd="QLD" refid="ch.8-pt.4" target.doc.id="act-1989-110" target.guid="_4ec0388c-2b43-41da-999a-7cd035c7d88d" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">part 4</legref> (Coal mining lease and oil shale mining lease applications in response to Petroleum and Gas (Production and Safety) Act preference decision).</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_ebd1b1a4-2bb6-4b81-be1e-9f7c5d484a16" id="sec.324-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the decision on the mining lease application is to grant a mining lease for all of the land, the ATP-related application is taken to have lapsed, unless the coal or oil shale exploration tenement holder has consented in writing to the application.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2a0519c2-15b2-4b27-b3e1-f23f9ba13c1e" id="sec.325" provision.type="other" spent.amends="0"><no>325</no><heading guid="_ec51d92d-fabf-4d6c-a182-8301cff2bbe2" id="sec.325-he">Mining lease application for part of the land</heading><subclause affected.by.uncommenced="0" guid="_43290812-8acc-4356-a215-9242ec77592f" id="sec.325-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the coal or oil shale exploration tenement holder applies for a mining lease for part of the land within the mining lease application period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c503bd05-3b7a-411f-b3a5-e35bdb4bb3db" id="sec.325-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The person who made the ATP-related application may amend it so that a petroleum lease is only sought for all or part of the rest of the land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f54c71b8-1fa1-4f3e-8f23-283c1ac9a806" id="sec.325-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Unless the amendment is made, a further step can not be taken to decide the ATP-related application until after the mining lease application has been decided.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2d4ba06e-cee6-4db0-92d3-c45b89c6e1e1" id="sec.325-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_25afdfbb-0673-4908-ace9-0468bde1dfce" id="sec.325-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the amendment has not been made; and</txt></block></li><li guid="_9790fe63-44f9-4a41-a233-2b895b231098" id="sec.325-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the decision on the mining lease application is to grant a mining lease for part of the land;</txt></block></li></list></block><block><txt break.before="1">the person who made the ATP-related application may amend it so that a petroleum lease is only sought for all or part of the rest of the land.</txt><note guid="_db0e6e93-66f4-421d-9e34-a2abf200ee83" id="sec.325-ssec.4-note" type="example"><heading guid="_65e214bd-7567-4faa-b85d-be143617cc4d" id="sec.325-ssec.4-note-he">Note—</heading><block><txt break.before="1">If the petroleum lease application is not amended, see <intref check="valid" refid="sec.350" target.guid="_43206646-9872-4cd7-96e4-006805f039a7">section 350</intref>.</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f4f28a01-91a1-4ca8-b758-f5077e3548d1" id="sec.326" provision.type="other" spent.amends="0"><no>326</no><heading guid="_11804349-1b41-461f-a222-1120bf8f70f9" id="sec.326-he">No mining lease application</heading><block><txt break.before="1">If the coal or oil shale exploration tenement holder does not apply for a mining lease for any of the land within the mining lease application period, the ATP-related application may be decided.</txt></block></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_94899d5c-c840-4360-8867-03088beb8699" id="ch.3-pt.2-div.1-sdiv.8"><no>Subdivision 8</no><heading guid="_4ac52afa-1144-41b1-9713-2c3a307755e7" id="ch.3-pt.2-div.1-sdiv.8-he">Deciding petroleum lease</heading><clause affected.by.uncommenced="0" guid="_474a6f63-deb6-4297-98fa-c6437d5d3390" id="sec.327" provision.type="other" spent.amends="0"><no>327</no><heading guid="_dde47c21-5058-438d-bbbb-0613c77e2e9d" id="sec.327-he">Application of <intref check="valid" refid="ch.3-pt.2-div.1-sdiv.8" target.guid="_94899d5c-c840-4360-8867-03088beb8699">sdiv 8</intref></heading><block><txt break.before="1">This subdivision applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_893d1c37-fb02-4b51-b78c-c32e234c406b" id="sec.327-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the coal or oil shale exploration tenement holder has not complied with <intref check="valid" refid="sec.313" target.guid="_d0f7f8a9-32db-446f-a486-3314ab6e2483">section 313</intref><intref check="valid" refid="sec.313-para1.a" target.guid="_9041b8ec-3a96-40ca-8b3d-166f4c7f5ba1">(a)</intref>; or</txt></block></li><li guid="_ee82249a-f690-4c78-9a59-87cc7a4ecf32" id="sec.327-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the tenement holder has, under <intref check="valid" refid="sec.314" target.guid="_59e51d7e-3865-4a05-9438-464af9977aa7">section 314</intref>, lodged a submission stating that the holder does not wish any coal or oil shale development preference for the land; or</txt></block></li><li guid="_58bc6d90-85f0-4623-8cb4-da893cc6ff5b" id="sec.327-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the tenement holder has not lodged any submission under <intref check="valid" refid="sec.314" target.guid="_59e51d7e-3865-4a05-9438-464af9977aa7">section 314</intref> within the submission period; or</txt></block></li><li guid="_9b37756f-2e88-4c0b-887a-c1f5d6a92de7" id="sec.327-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">under <intref check="valid" refid="sec.318" target.guid="_46fe5f25-c9ce-4400-a47f-ce9b095766a7">section 318</intref>, a preference decision is required and—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6d38698d-eac6-404f-a860-2c7c4c589a0d" id="sec.327-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the preference decision was not to give coal or oil shale development preference for any of the land; or</txt></block></li><li guid="_6b1267f3-b355-48ca-b1dc-b5aa70b2d4dc" id="sec.327-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the preference decision was to give coal or oil shale development preference for the whole or part of the land and, after <intref check="valid" refid="ch.3-pt.2-div.1-sdiv.7" target.guid="_44e36685-8865-43e8-819e-d61d45bb6809">subdivision 7</intref> is complied with, the Minister decides to grant a petroleum lease for the land.</txt></block></li></list></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_f6c080ae-d563-45e7-af9b-1cf76342b562" id="sec.328" provision.type="other" spent.amends="0"><no>328</no><heading guid="_fab9ec7d-4553-4a4e-8d4b-a316f4876f37" id="sec.328-he">Additional criteria for deciding provisions of petroleum lease</heading><subclause affected.by.uncommenced="0" guid="_18fa034e-cf7c-47b5-be1f-9d27e3451d18" id="sec.328-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">In deciding the provisions of the petroleum lease the following must also be considered—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_57a46189-8104-45ef-a91b-dd4afc4a31b3" id="sec.328-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the CSG assessment criteria;</txt></block></li><li guid="_2d8591b3-29d5-4a04-b6c3-5ce5f3fa03b2" id="sec.328-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the effect of the petroleum lease on safe and efficient mining of coal or oil shale under any adjacent lease;</txt></block></li><li guid="_a27970b8-28b4-4fb0-ae35-cd9a77ef1046" id="sec.328-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the effect on safe and efficient mining of coal or oil shale under any future coal or oil shale mining lease that arises from the coal or oil shale exploration tenement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e8041104-1485-4c9f-a508-62c4e22ada5e" id="sec.328-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.328-ssec.1" target.guid="_18fa034e-cf7c-47b5-be1f-9d27e3451d18">Subsection (1)</intref> does not limit other matters that must be considered under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>.</txt><note guid="_713bbaab-5cfa-4596-8835-d628056a6624" id="sec.328-ssec.2-note" type="example"><heading guid="_ffa50786-2736-4823-b917-53a471a3cd1e" id="sec.328-ssec.2-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="sec.104" target.guid="_505d1bab-1a07-4b29-be47-c730c5acf46c">sections 104</intref> to <intref check="valid" refid="sec.123" target.guid="_ef44ece4-3399-4e95-8180-52c9dbb8d1b6">123</intref>, <intref check="valid" refid="sec.133" target.guid="_3b0b11d3-54f7-4850-acb3-cc23c9dfae7b">133</intref> and <intref check="valid" refid="sec.134" target.guid="_d5782881-84f3-4e15-b116-bf40b138e426">134</intref>.</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1c4755b7-4674-4bc3-88cc-c8f72ed6be02" id="sec.329" provision.type="other" spent.amends="0"><no>329</no><heading guid="_2ffd24cd-9464-4778-be54-59aa404902a8" id="sec.329-he">Power to impose relinquishment condition</heading><subclause affected.by.uncommenced="0" guid="_a48c3177-8d26-4289-bac9-f5a58ed70413" id="sec.329-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">In deciding the provisions of the petroleum lease, a condition may be imposed that its holder is required, by a lodged notice, to relinquish a stated part or percentage of its area at stated times or intervals.</txt><note guid="_5977db86-69c5-4e05-8f76-f078f68d05cf" id="sec.329-ssec.1-note" type="example"><heading guid="_5d6233eb-2ed8-4cf9-98b0-f262d285de65" id="sec.329-ssec.1-note-he">Note—</heading><block><txt break.before="1">See however <intref check="valid" refid="sec.368" target.guid="_f021c412-8ba2-4667-a5fb-f133e5ab8014">section 368</intref> (Cessation of relinquishment condition for area not overlapping with coal or oil shale exploration tenement).</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_50b65134-8101-43d5-9dc1-c423c1f361da" id="sec.329-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A condition mentioned in <intref check="valid" refid="sec.329-ssec.1" target.guid="_a48c3177-8d26-4289-bac9-f5a58ed70413">subsection (1)</intref> is a <defterm guid="_3bca9c1a-2d55-4608-b099-9a0c17326d0f" id="sec.329-def.relinquishmentcondition" type="definition">relinquishment condition</defterm>.</txt><note guid="_5f0bcb1c-dba2-44a9-99ba-979c495ee3eb" id="sec.329-ssec.2-note" type="example"><heading guid="_f0bc443e-cfe9-4c2b-bcd8-989621ae7f3d" id="sec.329-ssec.2-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.367" target.guid="_dcbc48a2-b14d-4ce7-bf78-6e5c7ec32505">section 367</intref> (Requirement for giving of copy of relinquishment report).</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_4a14a137-1a27-4740-a4b6-ee50a414a2aa" id="sec.329-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">This section does not limit any power under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref> to impose conditions on the petroleum lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1dc118f3-c954-4765-90a4-e7c21c0b7a94" id="sec.329-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A relinquishment under a relinquishment condition takes effect on the day after the notice is lodged.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1900465d-d797-41b5-b282-87eff9709922" id="sec.330" provision.type="other" spent.amends="0"><no>330</no><heading guid="_e9375dfa-589b-4946-9714-83441eaeae12" id="sec.330-he">Publication of outcome of application</heading><subclause affected.by.uncommenced="0" guid="_e4463e79-b40f-4445-8469-7b525bd3663d" id="sec.330-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">After the Minister decides whether to grant the petroleum lease, the chief executive must publish a notice about the outcome of the application in the gazette or another publication the Minister considers appropriate.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7c243d59-d06a-4e56-8cf3-0fd5fdfa81e0" id="sec.330-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4fa67a68-81f6-4f7e-8b1c-8dafb99435d9" id="sec.330-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">whether the Minister decided to grant or not to grant the petroleum lease; and</txt></block></li><li guid="_8e818edb-db92-4627-8dd4-12f053dc2366" id="sec.330-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the decision was to grant—any conditions of the petroleum lease other than the mandatory conditions; and</txt></block></li><li guid="_12f50011-643d-461c-a3a6-21530af77a7e" id="sec.330-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if, under <intref check="valid" refid="sec.318" target.guid="_46fe5f25-c9ce-4400-a47f-ce9b095766a7">section 318</intref>, a preference decision was required and that decision was to give coal or oil shale development preference for the whole or part of the land—the decision, and the reasons for it.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2efbd0dd-6283-4053-b73d-c8812e6c43ca" id="sec.330-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, if the chief executive considers that information in any condition is commercial-in-confidence, the chief executive may, instead of publishing the condition, publish a statement about the intent of the condition.</txt></block></subclause></clause></subdivision></division><division affected.by.uncommenced="0" guid="_f13bd9b3-11be-4097-b13c-8f1d8ff3b62b" id="ch.3-pt.2-div.2"><no>Division 2</no><heading guid="_37f43ebc-15ea-4dec-af37-ad4e433dae9d" id="ch.3-pt.2-div.2-he">Petroleum lease application by or jointly with, or with the consent of, coal or oil shale exploration tenement holder</heading><clause affected.by.uncommenced="0" guid="_cb7b55cf-1796-4b25-9b30-4b8cfdf0d332" id="sec.331" provision.type="other" spent.amends="0"><no>331</no><heading guid="_fdf8f122-6ca5-4a58-bdc2-8d88fe63763f" id="sec.331-he">Application of <intref check="valid" refid="ch.3-pt.2-div.2" target.guid="_f13bd9b3-11be-4097-b13c-8f1d8ff3b62b">div 2</intref></heading><subclause affected.by.uncommenced="0" guid="_168b219c-0f2d-45e5-af0b-ad7c04629813" id="sec.331-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This division applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e811f2dd-4018-415e-a58f-899e1a8793f4" id="sec.331-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">land is in the area of a coal or oil shale exploration tenement; and</txt></block></li><li guid="_ccfab490-e8b7-4396-832b-3c815137625d" id="sec.331-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a person who, under <intref check="valid" refid="sec.117" target.guid="_3f8f9173-3607-43d2-a692-aa8f1a2489e8">section 117</intref>, may make an ATP-related application for all or part of the land wishes to make that application; and</txt></block></li><li guid="_f6f8b587-786d-4c5c-b698-8140437618a6" id="sec.331-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the tenement holder has consented to the making of the application.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3669798d-e4ea-47cf-abd3-7667b0fa3819" id="sec.331-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">This division also applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_258885d7-2837-400c-bd72-d13ac3b2f0e3" id="sec.331-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">land is in the area of a coal or oil shale exploration tenement; and</txt></block></li><li guid="_d69f340f-f356-4086-bda5-6ca02a8d7719" id="sec.331-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a person as follows wishes to apply for a petroleum lease for all or part of the land—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a440e1a1-715d-4163-a23b-82da97e4c550" id="sec.331-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the coal or oil shale exploration tenement holder;</txt></block></li><li guid="_9d860fcf-15b6-467c-b10c-9819c759c58c" id="sec.331-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a person who wishes to make the application jointly with the holder; and</txt></block></li></list></block></li><li guid="_6475cf8e-df5b-4ee3-a443-02b07d85a4fe" id="sec.331-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a person mentioned in <intref check="valid" refid="sec.331-ssec.2-para1.b" target.guid="_d69f340f-f356-4086-bda5-6ca02a8d7719">paragraph (b)</intref> has made a coal mining lease application or oil shale mining lease application for the land and the application is not for a specific purpose mining lease; and</txt></block></li><li guid="_b1a75bab-ce5d-4e48-a26f-2b56dfeb5222" id="sec.331-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the purpose of the proposed petroleum lease application is to allow the use of incidental coal seam gas for a purpose other than a use or activity under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.318CN" target.doc.id="act-1989-110" target.guid="_a3879f50-6ebc-40cf-afe4-cd740fdd22de" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 318CN</legref><legref check="invalid" jurisd="QLD" type="act">(2)</legref><legref check="invalid" jurisd="QLD" type="act">(a)</legref> or <legref check="invalid" jurisd="QLD" type="act">(b)</legref>, or 318CNA(2)(a) or (b).</txt><note guid="_bddfb702-4115-42f3-81c0-266d3d061d6c" id="sec.331-ssec.2-para1.d-note" type="example"><heading guid="_8077d017-86a1-4e3c-8307-580151829815" id="sec.331-ssec.2-para1.d-note-he">Note—</heading><block><txt break.before="1">See the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.318CN" target.doc.id="act-1989-110" target.guid="_a3879f50-6ebc-40cf-afe4-cd740fdd22de" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 318CN</legref> (Use that may be made under mining lease of incidental coal seam gas).</txt></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a0113395-4873-4915-80d5-cbffdd08f4ed" id="sec.331-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, this division does not apply if land is in the area of a coal or oil shale exploration tenement that is a mineral (f) pilot tenure.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2b26c316-0324-49a4-aa9c-f81c0d8dbbe9" id="sec.332" provision.type="other" spent.amends="0"><no>332</no><heading guid="_f8d6a269-467c-488b-a32a-355be07720e8" id="sec.332-he">Right to apply for petroleum lease</heading><subclause affected.by.uncommenced="0" guid="_ba646fad-94db-4f04-9925-faec0b5c8300" id="sec.332-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The person may apply for a petroleum lease for all or part of the land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ee6d4394-5697-4648-ae83-e0444317134a" id="sec.332-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The area of the proposed petroleum lease need not comply with <intref check="valid" refid="sec.168" target.guid="_734a0050-dc06-4a36-a451-0fd4eeda33ba">section 168</intref><intref check="valid" refid="sec.168-ssec.4" target.guid="_db0b978c-7889-4a1d-9c77-094d5987451f">(4)</intref> to (<del xml:space="preserve"><intref check="valid" refid="sec.168-ssec.8" target.guid="_c248c298-6310-4474-bc43-12d3332a5ee7">8).</intref></del><ins xml:space="preserve">7).</ins></txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_07915c5b-e04b-41a4-80f1-7750df3e3df3" id="sec.333" provision.type="other" spent.amends="0"><no>333</no><heading guid="_56b69bc2-72e0-44d0-a886-80580da5ec88" id="sec.333-he">Requirements for making application</heading><subclause affected.by.uncommenced="0" guid="_f586bf2e-b0d7-4d73-aaec-a98a1ff2283f" id="sec.333-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The petroleum lease application must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b7179141-04ae-4a5f-8764-5082646844ca" id="sec.333-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">comply with the requirements under <intref check="valid" refid="sec.118" target.guid="_b88b4157-85c9-434a-b055-16b32f32d149">section 118</intref> for making an ATP-related application; and</txt></block></li><li guid="_2932e112-8a77-4efc-b2df-94c0c9a37faf" id="sec.333-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_47641c99-3e88-4859-8983-91597fdd4c2a" id="sec.333-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a CSG statement; and</txt><note guid="_ae5fc2f2-6e16-45f0-80e5-a0cc53fe06d6" id="sec.333-ssec.1-para1.b-para2.i-note" type="example"><heading guid="_14f09456-c9e9-4293-b976-c9c3b2cbcb47" id="sec.333-ssec.1-para1.b-para2.i-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="sec.306" target.guid="_3015ef08-e9ea-42a5-ba7b-06369abb9aa7">section 306</intref> (Content requirements for CSG statement).</txt></block></note></block></li><li guid="_f1d65a38-1b36-4224-a603-a5cb5c25e827" id="sec.333-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">other information that addresses the CSG assessment criteria.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7ae6cd63-cc67-4a69-89be-209ed97d1c8f" id="sec.333-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The proposed initial development plan required under <intref check="valid" refid="sec.118" target.guid="_b88b4157-85c9-434a-b055-16b32f32d149">section 118</intref> must, as well as complying with the initial development plan requirements, also comply with <intref check="valid" refid="ch.3-pt.6" target.guid="_125342c0-5c01-4b66-ba95-a4209c82febf">part 6</intref>, <intref check="valid" refid="ch.3-pt.6-div.1" target.guid="_7f7f7f14-6407-41d1-8ee6-c9da46c15af4">division 1</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_174b38bf-7e2e-4ef1-8ef6-00bccd8c3dc0" id="sec.334" provision.type="other" spent.amends="0"><no>334</no><heading guid="_ec08ba97-594f-4f8e-8d58-793b200a0d2e" id="sec.334-he">No calls for tenders after application made</heading><block><txt break.before="1">A call for tenders for a petroleum lease can not be made for the land if the petroleum lease application has not been decided.</txt></block></clause><clause affected.by.uncommenced="0" guid="_0ebc86ed-1161-4215-ae17-361f90d702cf" id="sec.335" provision.type="other" spent.amends="0"><no>335</no><heading guid="_ef245875-b0bd-4f20-b6d3-05a16d9d7ef0" id="sec.335-he">Applications relating to exploration tenement and mining lease not held by same person</heading><subclause affected.by.uncommenced="0" guid="_f781aa60-a390-4072-abb3-a66fa84fbe0b" id="sec.335-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c0a7d140-a7c7-4496-8003-a48dfbc1378d" id="sec.335-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a person to whom this division applies wishes to make an application to which this division applies for land in the area of each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bb5a83fc-3a24-45cd-bae8-1e29c90befdf" id="sec.335-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the coal or oil shale exploration tenement (the <defterm guid="_a1a25d68-b660-4999-a0c1-11ac69fcb7dc" id="sec.335-ssec.1-para1.a-def.explorationtenementpart" type="definition">exploration tenement part</defterm>);</txt></block></li><li guid="_12774ea2-0287-47c9-82a9-1f635a1ce685" id="sec.335-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a coal or oil shale mining lease (the <defterm guid="_36dd51ae-c250-48b8-9cfa-421e7f69d411" id="sec.335-ssec.1-para1.a-def.miningleasepart" type="definition">mining lease part</defterm>); and</txt></block></li></list></block></li><li guid="_2f4af808-c0a0-4d73-9965-1be88c8ea99c" id="sec.335-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the exploration tenement and the mining lease are not held by the same person.</txt><note guid="_95d0c709-5d46-47c5-afc6-81e764055ae0" id="sec.335-ssec.1-para1.b-note" type="example"><heading guid="_085b87cc-bdef-4048-984f-63ac1e154e46" id="sec.335-ssec.1-para1.b-note-he">Note—</heading><block><txt break.before="1">If the coal or oil shale exploration tenement and the coal or oil shale mining lease are held by the same person, see <intref check="valid" refid="sec.344" target.guid="_de85f9f9-1055-4925-8798-60a63a2a7391">section 344</intref><intref check="valid" refid="sec.344-ssec.3" target.guid="_5b74d89c-88c3-41eb-8155-287cdf555520">(3)</intref>.</txt></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3be2573d-fb8d-471e-81e5-3aec42da3620" id="sec.335-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The person may make separate ATP-related applications for the exploration tenement part and the mining lease part.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1c6e8cd6-095d-4e6f-943d-f6582eb1f0a9" id="sec.335-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A separate application for the exploration tenement part, or the part of an application that relates to the exploration tenement part, must be decided under this division.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c2cbe8a9-58fd-438c-a992-34148cc3058b" id="sec.335-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A separate application for the mining lease part, or the part of an application that relates to the mining lease part, must be decided under <intref check="valid" refid="ch.3-pt.3" target.guid="_e9bc49f9-3a04-49d3-b854-498473bad865">part 3</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0d27c553-499f-4ea5-b493-08048a105cdd" id="sec.336" provision.type="other" spent.amends="0"><no>336</no><heading guid="_f9b21afb-8baf-42f6-9af2-a42e7b65a43b" id="sec.336-he">Applications relating to other land</heading><subclause affected.by.uncommenced="0" guid="_ad3f477b-6ead-4639-b7dc-941e4416e17c" id="sec.336-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a person to whom this division applies wishes to make an application to which this division applies and the proposed application includes land (the <defterm guid="_4f6b56e5-1ca9-4d1f-9469-edf4a6213756" id="sec.336-def.otherpart" type="definition">other part</defterm>) not in the area of a coal or oil shale mining tenement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5d535cba-6d9a-4ff2-bc0b-e65d8859af30" id="sec.336-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The person may make a separate ATP-related application for the other part.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4052d34c-322b-4fbf-a027-b45cd30687ba" id="sec.336-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A separate application for the other part, or the part of an application that relates to the other part, must be decided under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e58fe21f-0f1d-4ebd-9bc6-f127183cf308" id="sec.338" provision.type="other" spent.amends="0"><no>338</no><heading guid="_dd0a915f-0fd0-4e30-ad07-f7d7c50dcb99" id="sec.338-he">Priority for earlier mining lease application or proposed application</heading><block><txt break.before="1"><intref check="valid" refid="ch.3-pt.2-div.1" target.guid="_0b0b11a3-c85f-4117-b2ee-a82a37bb5d16">Division 1</intref>, <intref check="valid" refid="ch.3-pt.2-div.1-sdiv.5" target.guid="_f1ca2821-2d71-4d3f-a4e2-d3d8dbb3da17">subdivision 5</intref>, applies for the petroleum lease application.</txt></block></clause><clause affected.by.uncommenced="0" guid="_2d3e4a00-a6cf-495c-89b4-07a3ebb74925" id="sec.339" provision.type="other" spent.amends="0"><no>339</no><heading guid="_b4e406a2-8413-49ea-b662-4bbea3b0e1cd" id="sec.339-he">Priority for deciding earlier petroleum lease application</heading><block><txt break.before="1">If, before the making of the petroleum lease application—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_176e0d7f-750f-4ceb-a3a5-7272e814f5f1" id="sec.339-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">someone else has applied for a petroleum lease for the whole or part of the proposed area of the petroleum lease; and</txt></block></li><li guid="_045a0304-4850-476c-b689-51b1bbd98b03" id="sec.339-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the other application complies with <intref check="valid" refid="sec.305" target.guid="_f8a0d070-7bc2-4125-8d40-9e466d7983f8">section 305</intref>;</txt></block></li></list></block><block><txt break.before="1">the Minister must decide the other application first unless the petroleum lease applicant agrees otherwise.</txt></block></clause><clause affected.by.uncommenced="0" guid="_9b3d744f-90d5-4e0b-8afe-68123f993116" id="sec.340" provision.type="other" spent.amends="0"><no>340</no><heading guid="_5436f875-a77f-4797-90e6-d38538c6bd94" id="sec.340-he">Right to grant if particular requirements met</heading><subclause affected.by.uncommenced="0" guid="_a441fc9d-a98b-4103-b7a8-30c5e9c819c4" id="sec.340-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies subject to <intref check="valid" refid="sec.339" target.guid="_2d3e4a00-a6cf-495c-89b4-07a3ebb74925">section 339</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a42da2f7-44c2-4fe5-85e6-eb6b84aca774" id="sec.340-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the application is an ATP-related application, the Minister must grant the petroleum lease if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2b92957c-ca0a-4019-9d15-2bd46c9561d8" id="sec.340-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the applicant is an eligible person; and</txt></block></li><li guid="_4adcb47c-0612-4533-a971-e84c084fd85e" id="sec.340-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the coal or oil shale exploration tenement holder has consented to the grant; and</txt></block></li><li guid="_3af3de4e-62f3-461b-bcb8-1f368d680016" id="sec.340-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the requirements for grant have been complied with.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_503788f2-0559-42ff-98f9-c550c10d757f" id="sec.340-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the application is not an ATP-related application, the Minister must grant the petroleum lease if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a4c675a1-9571-451b-99c2-0e1a9ab84871" id="sec.340-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the applicant is an eligible person; and</txt></block></li><li guid="_fda24e06-9701-4bf6-942c-363cdf107073" id="sec.340-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">either—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f75fd2ae-9cbc-4e13-aa3a-064dae0c799e" id="sec.340-ssec.3-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the applicant has been granted a coal or oil shale mining lease over the proposed area of the petroleum lease; or</txt></block></li><li guid="_450f0ef0-c441-4d19-ab1c-006f140a1f93" id="sec.340-ssec.3-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">any preference decision required under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref> for the coal or oil shale mining lease application has been made and, under <legref check="valid" jurisd="QLD" refid="sec.271A" target.doc.id="act-1989-110" target.guid="_cc66a45f-121a-45dc-baad-a77305b0503f" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 271A</legref> of that Act, a decision has been made to grant the applicant a coal or oil shale mining lease for the land; and</txt><note guid="_503802a5-11a0-4a50-9e8e-0f7972f62d75" id="sec.340-ssec.3-para1.b-para2.ii-note" type="example"><heading guid="_809e33e4-127a-41f5-a56f-741f7cffd6ee" id="sec.340-ssec.3-para1.b-para2.ii-note-he">Note—</heading><block><txt break.before="1">For when a preference decision under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref> is required, see <legref check="valid" jurisd="QLD" refid="sec.318BA" target.doc.id="act-1989-110" target.guid="_823b9e4b-2c00-4ba0-9ddd-edae145e8089" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 318BA</legref> of that Act.</txt></block></note></block></li></list></block></li><li guid="_325d79e3-1802-46e6-8905-28cf10a41dac" id="sec.340-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the Minister is satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4ce2be59-015d-4e79-a099-3b52eb79b7bf" id="sec.340-ssec.3-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the requirements for grant, other than the requirement under <intref check="valid" refid="sec.121" target.guid="_7ba300a7-78fd-4831-8fe2-a3dc6ea79cf0">section 121</intref><intref check="valid" refid="sec.121-ssec.1" target.guid="_2bef5596-0ba8-4bb3-bdca-b2ac997bf3e2">(1)</intref><intref check="valid" refid="sec.121-ssec.1-para1.c" target.guid="_fd2f9979-f0d2-46b1-9041-e702453d6e6b">(c)</intref>, have been complied with; and</txt></block></li><li guid="_7f398895-9e8e-4736-83be-dd3050d998ed" id="sec.340-ssec.3-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the conditions of the coal or oil shale exploration tenement have been substantially complied with.</txt></block></li></list><note guid="_0c619ca6-656b-434f-8fc0-a7cb341c057c" id="sec.340-ssec.3-para1.c-note" type="example"><heading guid="_1fa91530-6b5a-4722-9f5f-2b83e2c248ec" id="sec.340-ssec.3-para1.c-note-he">Note—</heading><block><txt break.before="1">If the area of the petroleum lease includes overlapping ATP land, the authority holder’s written agreement is needed to carry out any authorised activity under the lease other than an activity related to incidental coal seam gas. See <intref check="valid" refid="ch.3-pt.5" target.guid="_59822ecb-942d-4546-ac03-3b1428443975">part 5</intref>, <intref check="valid" refid="ch.3-pt.5-div.1" target.guid="_41279ea8-a7b6-42e9-b6cc-0b6680ceea46">division 1</intref>.</txt></block></note></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_ca9c79b0-51b0-4864-85ec-99d9057735be" id="sec.341" provision.type="other" spent.amends="0"><no>341</no><heading guid="_6e1739c0-40d5-4109-948f-993e5b775368" id="sec.341-he">Provisions of petroleum lease</heading><subclause affected.by.uncommenced="0" guid="_83995ae7-a7b6-400a-9422-5bf69ff377dd" id="sec.341-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the petroleum lease application is granted, <intref check="valid" refid="sec.123" target.guid="_ef44ece4-3399-4e95-8180-52c9dbb8d1b6">section 123</intref> applies as if the application were an ATP-related application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_26b49cc0-42ca-43c1-9b1d-b388d95f1682" id="sec.341-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In deciding the provisions of the petroleum lease, the following matters must also be considered—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d9f3afbb-4a7a-4ce3-926e-07604a9527c7" id="sec.341-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the provisions recommended for the relevant mining lease;</txt></block></li><li guid="_63efc52e-aeab-445b-ac65-817618bf5c44" id="sec.341-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the development plan for the relevant mining lease;</txt></block></li><li guid="_bc4f5c7f-c21c-4557-9a3a-a9ebfeeb639f" id="sec.341-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the area of the petroleum lease will include land (<defterm guid="_6dde9670-890b-4410-a636-345d631ffd30" id="sec.341-ssec.2-def.overlappingATPland" type="definition">overlapping ATP land</defterm>) in the area of, or excluded land for, an authority to prospect or a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP held by someone other than the petroleum lease holder—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_21d33fa7-a4d3-4532-9b4a-c1cb28775392" id="sec.341-ssec.2-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the legitimate business interests, rights and future development proposals of the authority to prospect holder; and</txt></block></li><li guid="_b92ca8bd-2383-43d2-99b8-3da507671401" id="sec.341-ssec.2-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the likelihood of coordinated production of petroleum in relation to the overlapping ATP land being subject to an agreement under <intref check="valid" refid="sec.364" target.guid="_8c723f18-f87b-4879-9b05-d58ccf23a408">section 364</intref><intref check="valid" refid="sec.364-ssec.2" target.guid="_a47f6bde-45bb-4a26-905a-5c2f1770a27b">(2)</intref>.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e38a782c-9279-4164-b9e4-4a48968ed41a" id="sec.341-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A relinquishment condition may be imposed.</txt><note guid="_28e326ba-3176-4bfd-ad6f-ec96c50d7dce" id="sec.341-ssec.3-note" type="example"><heading guid="_8bf7b34f-1c50-4b8b-b862-7051282c294e" id="sec.341-ssec.3-note-he">Note—</heading><block><txt break.before="1">See however <intref check="valid" refid="sec.368" target.guid="_f021c412-8ba2-4667-a5fb-f133e5ab8014">section 368</intref> (Cessation of relinquishment condition for area not overlapping with coal or oil shale exploration tenement).</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_5de85619-1a82-4615-8eac-53c2bbd6850f" id="sec.341-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0"><intref check="valid" refid="sec.341-ssec.3" target.guid="_e38a782c-9279-4164-b9e4-4a48968ed41a">Subsection (3)</intref> does not limit any power under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref> to impose conditions on the petroleum lease.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_68ae49d1-c635-4067-b26e-01c794aa6bc1" id="ch.3-pt.2-div.3"><no>Division 3</no><heading guid="_c64dc293-7233-4e45-a9c6-0ed2308125bb" id="ch.3-pt.2-div.3-he">Petroleum lease applications in response to <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref> preference decision</heading><clause affected.by.uncommenced="0" guid="_9e0c02d5-43c1-4e0b-bf31-ea6f6acd20fb" id="sec.342" provision.type="other" spent.amends="0"><no>342</no><heading guid="_722755b1-57a9-4140-8098-36c472e01cd7" id="sec.342-he">Additional ground for refusing application</heading><subclause affected.by.uncommenced="0" guid="_27349279-da7b-45eb-9b17-635849c7ab2b" id="sec.342-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_80a0168c-7d90-405a-aac1-2140df3122d5" id="sec.342-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a petroleum lease application is made in response to an invitation given under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.318BG" target.doc.id="act-1989-110" target.guid="_28fabf94-678f-4d0c-9c61-120101c49d71" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 318BG</legref>; and</txt></block></li><li guid="_3f3f9322-2c34-4db7-be14-4b7de276ce47" id="sec.342-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the application is made within 6 months after the giving of the invitation.</txt><note guid="_46855f8b-6f3e-4a36-be73-5c57307fb612" id="sec.342-ssec.1-para1.b-note" type="example"><heading guid="_4dd71cad-eabd-4b35-8622-cb1032a728ff" id="sec.342-ssec.1-para1.b-note-he">Note—</heading><block><txt break.before="1">If the application is not made within the 6 months, see the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.318BJ" target.doc.id="act-1989-110" target.guid="_758db1ec-8a88-477a-b7c9-4ea8fff33dd5" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 318BJ</legref>.</txt></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_68386a6b-6ef5-4ca0-8d59-727aa52c5907" id="sec.342-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister may decide to refuse the application if satisfied the applicant has not, in a timely manner—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_51426857-4586-49b2-9b7a-2b72865c3f9c" id="sec.342-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">taken any step in relation to the application required of the applicant under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref> or this chapter; or</txt></block></li><li guid="_c68d50ba-d50a-4b91-bb14-1bb261c86a6c" id="sec.342-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">satisfied the Minister about a matter that, under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref> or this chapter, is required for the granting of the application.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_dda12ee1-d00b-4ba7-bef8-875828a17ab7" id="sec.342-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0"><intref check="valid" refid="sec.342-ssec.2" target.guid="_68386a6b-6ef5-4ca0-8d59-727aa52c5907">Subsection (2)</intref> does not limit another ground for refusing the application under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, this chapter or <intref check="valid" refid="sec.843A" target.guid="_cc9ec269-641a-4758-bea2-7d374790f8d6">section 843A</intref>.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_e9bc49f9-3a04-49d3-b854-498473bad865" id="ch.3-pt.3"><no>Part 3</no><heading guid="_058821d7-98be-43f7-9bba-df70c0871eba" id="ch.3-pt.3-he">Obtaining petroleum lease over land in area of coal or oil shale mining lease</heading><division affected.by.uncommenced="0" guid="_437b4dbe-fd32-47ab-b0d2-4bb653c81bca" id="ch.3-pt.3-div.1"><no>Division 1</no><heading guid="_52cb2aa9-1fba-4167-8e60-ba0ca8792ccd" id="ch.3-pt.3-div.1-he">Exclusion of power to call for tenders</heading><clause affected.by.uncommenced="0" guid="_a8030e2e-ad88-495b-a65f-ba951ea99c69" id="sec.343" provision.type="other" spent.amends="0"><no>343</no><heading guid="_1c5a7648-550b-4c56-8343-2464e75b45af" id="sec.343-he">Exclusion</heading><block><txt break.before="1">The Minister can not make a call for tenders for a petroleum lease for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_105a4b9e-85f2-480b-bec1-48696fa3ce81" id="sec.343-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">land in the area of a coal or oil shale mining lease; or</txt></block></li><li guid="_7d904bf5-385f-4759-a41d-1998228d57c0" id="sec.343-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">land that is the subject of an application for a coal or oil shale mining lease when the call for tenders is made.</txt></block></li></list></block></clause></division><division affected.by.uncommenced="0" guid="_58d0f6cc-997c-4d07-bca4-042a06780001" id="ch.3-pt.3-div.2"><no>Division 2</no><heading guid="_257c28ca-b4a7-4487-86fc-4d049b4dd954" id="ch.3-pt.3-div.2-he">Petroleum lease application other than by or jointly with coal or oil shale mining lease holder</heading><clause affected.by.uncommenced="0" guid="_de85f9f9-1055-4925-8798-60a63a2a7391" id="sec.344" provision.type="other" spent.amends="0"><no>344</no><heading guid="_98681993-f549-4c5a-9504-aed6bbacf777" id="sec.344-he">Application of <intref check="valid" refid="ch.3-pt.3-div.2" target.guid="_58d0f6cc-997c-4d07-bca4-042a06780001">div 2</intref></heading><subclause affected.by.uncommenced="0" guid="_b785c562-737d-4824-a8ef-2e8d96658dde" id="sec.344-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This division applies if a person wishes to make an application for a petroleum lease for all or part of land in the area of a coal or oil shale mining lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d77297d6-f198-47a7-95ae-f10fbe49d8d6" id="sec.344-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, this division does not apply if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_197d7dca-83da-48cd-a60a-c0218d784ffb" id="sec.344-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the person is the mining lease holder; or</txt></block></li><li guid="_05459d39-2673-49ae-84e6-679df2090883" id="sec.344-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the application is to be made jointly with the holder; or</txt></block></li><li guid="_63b7d765-6ea6-4353-a4b7-e28e6a232234" id="sec.344-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the application relates to land in the area of a coal or oil shale exploration tenement that is a mineral (f) pilot tenure.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5b74d89c-88c3-41eb-8155-287cdf555520" id="sec.344-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_355314f1-7064-4c06-9bdf-ffd124fc2e9b" id="sec.344-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the land is also in the area of a coal or oil shale exploration tenement; and</txt></block></li><li guid="_afe22ada-2c14-4900-a59e-ded8dc3e1d2f" id="sec.344-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the same person holds the mining lease and the exploration tenement;</txt></block></li></list></block><block><txt break.before="1">a reference in this division to the mining lease holder includes a reference to the exploration tenement holder.</txt><note guid="_105bad60-1825-4a3e-8b63-8af2671326a3" id="sec.344-ssec.3-note" type="example"><heading guid="_12bcbf83-2b5f-4e4b-80d9-abdb45fa007a" id="sec.344-ssec.3-note-he">Note—</heading><block><txt break.before="1">If the coal or oil shale mining lease and the coal or oil shale exploration tenement are held by different persons, see <intref check="valid" refid="sec.307" target.guid="_ce42d819-db32-4cee-b58c-32b76ae7631f">section 307</intref>.</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d292789f-6917-4738-ac2b-d540dafe1eb2" id="sec.345" provision.type="other" spent.amends="0"><no>345</no><heading guid="_f8caf064-a2bb-435f-b98d-7f6248d9fbf2" id="sec.345-he">Additional requirements for making application</heading><subclause affected.by.uncommenced="0" guid="_073a8e5f-d5ed-4e82-a45a-ba1f0e364b1d" id="sec.345-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The petroleum lease application must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_798d6471-823c-4b6f-8fa3-9e64b18097d1" id="sec.345-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">comply with the requirements under <intref check="valid" refid="sec.118" target.guid="_b88b4157-85c9-434a-b055-16b32f32d149">section 118</intref> for making an ATP-related application; and</txt></block></li><li guid="_666dbcff-b345-4b0e-bb58-af2d1648222f" id="sec.345-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">include a CSG statement.</txt><note guid="_773f51db-abcf-4eb3-8890-c7a09791a568" id="sec.345-ssec.1-para1.b-note" type="example"><heading guid="_90b60f90-9e08-4229-b325-48f0cf83c7ea" id="sec.345-ssec.1-para1.b-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="sec.306" target.guid="_3015ef08-e9ea-42a5-ba7b-06369abb9aa7">section 306</intref> (Content requirements for CSG statement).</txt></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d5b0de3d-b5db-4277-a7a3-f7a7e925bb12" id="sec.345-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The proposed initial development plan required under <intref check="valid" refid="sec.118" target.guid="_b88b4157-85c9-434a-b055-16b32f32d149">section 118</intref> must, as well as complying with the initial development plan requirements, also comply with <intref check="valid" refid="ch.3-pt.6" target.guid="_125342c0-5c01-4b66-ba95-a4209c82febf">part 6</intref>, <intref check="valid" refid="ch.3-pt.6-div.1" target.guid="_7f7f7f14-6407-41d1-8ee6-c9da46c15af4">division 1</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_206320de-fa2d-478d-8219-838b9004725a" id="sec.346" provision.type="other" spent.amends="0"><no>346</no><heading guid="_735f2738-f42f-4a34-9db2-fa90257b9dd5" id="sec.346-he">Applications relating to other land</heading><subclause affected.by.uncommenced="0" guid="_d11b35cf-5cda-4f34-8a76-3c3539a727fa" id="sec.346-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a person to whom this division applies wishes to make an application to which this division applies and the proposed application includes land (the <defterm guid="_dfadbb12-8a7b-4d4d-85de-aa16fa0b6174" id="sec.346-def.otherpart" type="definition">other part</defterm>) not in the area of a coal or oil shale mining lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fd170d71-e734-405f-b784-79fa31feaae6" id="sec.346-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The person may make a separate petroleum lease application for the other part.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f47bbc6b-08bf-4e35-b059-65c3cad272f2" id="sec.346-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A separate application for the other part, or the part of an application that relates to the other part, must be decided under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_54b004ff-ee61-410a-a9cb-f3957513a055" id="sec.348" provision.type="other" spent.amends="0"><no>348</no><heading guid="_5fc815e8-bd93-4866-8dd1-20d6e40c5d37" id="sec.348-he">Notice to coal or oil shale mining lease holder</heading><block><txt break.before="1">The applicant must, within 10 business days after making the application, give the coal or oil shale mining lease holder a copy of the application, other than any part of the application that relates to the capability criteria.</txt><note guid="_50858820-174d-4b71-ab96-86d57cb4f3fd" id="sec.348-note" type="example"><heading guid="_7871f281-8a71-48a3-967e-b45cb8079339" id="sec.348-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="ch.3-pt.8" target.guid="_7848573e-9ea5-49cb-a174-595b65c98b82">part 8</intref> (Confidentiality of information).</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_8cbe36bc-0ea5-40ef-8076-658fcff80879" id="sec.349" provision.type="other" spent.amends="0"><no>349</no><heading guid="_8a2791ac-aaab-4f42-b85f-b10af3de3fea" id="sec.349-he">Coal mining lease holder’s or oil shale mining lease holder’s obligation to negotiate</heading><subclause affected.by.uncommenced="0" guid="_04b9d8e4-0527-42d6-9157-4aec46db09c8" id="sec.349-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The coal or oil shale mining lease holder must, after receiving the copy of the application, make reasonable attempts to reach a coordination arrangement with the applicant about the following matters that provides the best resource use outcome without significantly affecting the parties’ rights or interests—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_56cc1c07-471e-4d98-ad68-9901a38d4779" id="sec.349-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">petroleum production under the proposed petroleum lease;</txt></block></li><li guid="_65f09edb-a36f-471a-8b3f-a308550aecd4" id="sec.349-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">coal or oil shale mining and any incidental coal seam gas mining under the mining lease.</txt><note guid="_abbac4ab-7687-438f-83ff-e50b0d1aaeef" id="sec.349-ssec.1-para1.b-note" type="example"><heading guid="_a8a50199-fec8-43c3-9da7-2ab712be0474" id="sec.349-ssec.1-para1.b-note-he">Note—</heading><block><txt break.before="1">For the extent to which coal seam gas production is permitted under the coal or oil shale mining lease, see the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.8" target.doc.id="act-1989-110" target.guid="_6ec7482d-90fc-40bc-9086-d5a2470454fe" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">chapter 8</legref>, <legref check="valid" jurisd="QLD" refid="ch.8-pt.8" target.doc.id="act-1989-110" target.guid="_8a65b945-a1f0-4bcf-bfc9-bbf1ced45fb5" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">part 8</legref>, <legref check="invalid" jurisd="QLD" type="act">division 1</legref>.</txt></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5054db89-03a0-424b-babc-84013c1eca4b" id="sec.349-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the obligation under <intref check="valid" refid="sec.349-ssec.1" target.guid="_04b9d8e4-0527-42d6-9157-4aec46db09c8">subsection (1)</intref> applies only to the extent that a coordination arrangement is commercially and technically feasible for the mining lease holder.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_43206646-9872-4cd7-96e4-006805f039a7" id="sec.350" provision.type="other" spent.amends="0"><no>350</no><heading guid="_d7ea8183-adc0-4d99-bf2c-bbe4e837382e" id="sec.350-he">Additional requirements for grant</heading><subclause affected.by.uncommenced="0" guid="_83a555e8-ee5a-4484-94cd-b76589f7daec" id="sec.350-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The application may be granted only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_07976ed7-652f-44f1-94fb-771d5558b2b9" id="sec.350-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the applicant has negotiated, with the coal or oil shale mining lease holder, a proposed coordination arrangement (a <defterm guid="_dcfc1044-a18f-4e0a-a741-1fda593ff6d5" id="sec.350-ssec.1-def.relevantarrangement" type="definition">relevant arrangement</defterm>) about the following matters—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_819953a7-97ad-47bc-9487-396cb3067af0" id="sec.350-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">petroleum production under the proposed petroleum lease;</txt></block></li><li guid="_8a382c33-ee3b-4799-94a2-f88edf7dda00" id="sec.350-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">coal or oil shale mining and any incidental coal seam gas under the mining lease; and</txt></block></li></list></block></li><li guid="_78042fdb-d636-4522-814b-9499f4a65d72" id="sec.350-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Minister has approved the relevant arrangement; and</txt></block></li><li guid="_7263f9c7-0afa-4d7d-be27-14993c1c3d61" id="sec.350-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the applicant has made a safety management system for all operating plant on, or proposed to be on, the area of the proposed petroleum lease; and</txt></block></li><li guid="_9d00429a-0326-4026-a687-56d3bd3c82e0" id="sec.350-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the mining lease holder has agreed to the safety management system and lodged a notice that the holder has agreed to the system.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_04642fe4-0cdf-4ce5-855d-dc00bde9bfcb" id="sec.350-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister may decide to refuse the application if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_757f87da-47a7-447e-9c3c-9ca01fe4c528" id="sec.350-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the Minister is satisfied the applicant and the mining lease holder have, as required under <intref check="valid" refid="sec.349" target.guid="_8cbe36bc-0ea5-40ef-8076-658fcff80879">section 349</intref>, made reasonable attempts to reach a relevant arrangement; and</txt></block></li><li guid="_0f958c52-0d4b-49bf-955d-e74e5c17c8db" id="sec.350-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">either—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_24328f8e-70ce-497f-96a8-9192697c136c" id="sec.350-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the mining lease holder has lodged a notice stating there are no reasonable prospects of a relevant arrangement being made; or</txt></block></li><li guid="_e77c6626-6ec0-4e65-a722-b551ac4fbf0c" id="sec.350-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a relevant arrangement has not been lodged for approval by the Minister and the Minister considers the applicant and the mining lease holder have had a reasonable opportunity to make a relevant arrangement.</txt></block></li></list></block></li></list></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_21ca4657-89d9-4466-baea-a0479db6b7f2" id="ch.3-pt.3-div.3"><no>Division 3</no><heading guid="_e9165353-06fe-4b0e-b69c-feb435c6ccfe" id="ch.3-pt.3-div.3-he">Petroleum lease application by or jointly with coal or oil shale mining lease holder</heading><clause affected.by.uncommenced="0" guid="_414b8778-d155-4844-ba96-8c043d64c3fe" id="sec.351" provision.type="other" spent.amends="0"><no>351</no><heading guid="_6ba5ae76-cc64-4852-a9e3-fcff85cc677d" id="sec.351-he">Application of <intref check="valid" refid="ch.3-pt.3-div.3" target.guid="_21ca4657-89d9-4466-baea-a0479db6b7f2">div 3</intref></heading><block><txt break.before="1">This division applies if a person as follows wishes to apply for a petroleum lease for all or part of the land in the area of a coal or oil shale mining lease that is not a specific purpose mining lease—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_477c21d5-56e3-462e-863f-a66e51bc3280" id="sec.351-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the coal or oil shale mining lease holder;</txt></block></li><li guid="_162d2c27-7d20-411e-84c5-ae0c50352650" id="sec.351-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a person who wishes to make the application jointly with the holder.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_eaf2372d-4577-4132-a758-054bf03918bf" id="sec.352" provision.type="other" spent.amends="0"><no>352</no><heading guid="_17d49e2b-0b64-47a3-a1c9-121ecc1f9acd" id="sec.352-he">Right to apply for petroleum lease</heading><subclause affected.by.uncommenced="0" guid="_c6986776-914f-4ed2-9ec8-81e926b05754" id="sec.352-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The person may apply for a petroleum lease for all or part of the land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f0d5952f-e254-4b26-80df-33194f889eca" id="sec.352-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The area of the proposed petroleum lease need not comply with <intref check="valid" refid="sec.168" target.guid="_734a0050-dc06-4a36-a451-0fd4eeda33ba">section 168</intref><intref check="valid" refid="sec.168-ssec.4" target.guid="_db0b978c-7889-4a1d-9c77-094d5987451f">(4)</intref> to (<del xml:space="preserve"><intref check="valid" refid="sec.168-ssec.8" target.guid="_c248c298-6310-4474-bc43-12d3332a5ee7">8).</intref></del><ins xml:space="preserve">7).</ins></txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3dc712ec-7809-40f4-b407-57bf0ef1c76d" id="sec.353" provision.type="other" spent.amends="0"><no>353</no><heading guid="_de700bfb-4fbc-44ef-8748-1db86aca8813" id="sec.353-he">Requirements for making application</heading><subclause affected.by.uncommenced="0" guid="_bc40c53a-6c08-433a-a2e6-e9be0fd7858d" id="sec.353-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The petroleum lease application must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2111fa4b-141c-4795-95bf-95ea352f733e" id="sec.353-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">comply with the requirements under <intref check="valid" refid="sec.118" target.guid="_b88b4157-85c9-434a-b055-16b32f32d149">section 118</intref> for making an ATP-related application; and</txt></block></li><li guid="_3a835e7c-61c0-46fd-9e8b-38203624eb86" id="sec.353-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">include a CSG statement.</txt><note guid="_1293ddbe-2934-40fc-813a-827b6e327945" id="sec.353-ssec.1-para1.b-note" type="example"><heading guid="_78340c46-dd44-4f8e-aa37-609b2f7853cb" id="sec.353-ssec.1-para1.b-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="sec.306" target.guid="_3015ef08-e9ea-42a5-ba7b-06369abb9aa7">section 306</intref> (Content requirements for CSG statement).</txt></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c2b89cac-ee02-400a-ba9a-ced2231b83cc" id="sec.353-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The proposed initial development plan required under <intref check="valid" refid="sec.118" target.guid="_b88b4157-85c9-434a-b055-16b32f32d149">section 118</intref> must, as well as complying with the initial development plan requirements, also comply with <intref check="valid" refid="ch.3-pt.6" target.guid="_125342c0-5c01-4b66-ba95-a4209c82febf">part 6</intref>, <intref check="valid" refid="ch.3-pt.6-div.1" target.guid="_7f7f7f14-6407-41d1-8ee6-c9da46c15af4">division 1</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_70559164-c86a-44de-9262-3f27baff6655" id="sec.354" provision.type="other" spent.amends="0"><no>354</no><heading guid="_297d8cea-7017-433c-8213-62d931220ec7" id="sec.354-he">Applications relating to other land</heading><subclause affected.by.uncommenced="0" guid="_fe2ece5d-3173-4af0-ad41-710055ede485" id="sec.354-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a person to whom this division applies wishes to make an application to which this division applies and the proposed application includes land (the <defterm guid="_02398b16-6f0f-49ef-9c39-db467f60632b" id="sec.354-def.otherpart" type="definition">other part</defterm>) not in the area of a coal or oil shale mining lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c41c2fd9-df62-4c65-aed9-418121a5f620" id="sec.354-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The person may make a separate petroleum lease application for the other part.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_84ab3023-874c-4b3a-9a14-6f75160b71d4" id="sec.354-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A separate application for the other part, or the part of an application that relates to the other part, must be decided under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_962214dc-f85b-4056-b6ea-fb971d628929" id="sec.356" provision.type="other" spent.amends="0"><no>356</no><heading guid="_d17e830e-241a-43a3-a03f-3ef7d1e6823e" id="sec.356-he">Right to grant if particular requirements met</heading><block><txt break.before="1">The Minister must grant the petroleum lease if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_75517e76-c4ca-4f94-aac2-934d4841b4e5" id="sec.356-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the applicant is an eligible person; and</txt></block></li><li guid="_7fe7aff2-df0b-49d6-a8ce-444b50c11234" id="sec.356-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Minister is satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5daa5a3a-5ae0-4c23-af7a-7c6de846368a" id="sec.356-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the requirements for grant, other than the requirement under <intref check="valid" refid="sec.121" target.guid="_7ba300a7-78fd-4831-8fe2-a3dc6ea79cf0">section 121</intref><intref check="valid" refid="sec.121-ssec.1" target.guid="_2bef5596-0ba8-4bb3-bdca-b2ac997bf3e2">(1)</intref><intref check="valid" refid="sec.121-ssec.1-para1.c" target.guid="_fd2f9979-f0d2-46b1-9041-e702453d6e6b">(c)</intref>, have been complied with; and</txt></block></li><li guid="_dff85943-94d5-450b-8262-9573cc8e64a0" id="sec.356-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the conditions of the coal or oil shale mining lease have been substantially complied with.</txt></block></li></list></block></li></list><note guid="_6318a270-9fe6-4891-9e6e-215746f7b742" id="sec.356-note" type="example"><heading guid="_52d54322-cbb4-4f23-9aa6-cfa01ea5bdfb" id="sec.356-note-he">Note—</heading><block><txt break.before="1">If the area of the petroleum lease includes overlapping ATP land, the authority holder’s written agreement is needed to carry out any authorised activity under the lease other than an activity related to incidental coal seam gas. See <intref check="valid" refid="ch.3-pt.5" target.guid="_59822ecb-942d-4546-ac03-3b1428443975">part 5</intref>, <intref check="valid" refid="ch.3-pt.5-div.1" target.guid="_41279ea8-a7b6-42e9-b6cc-0b6680ceea46">division 1</intref>.</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_6b48eef6-a08e-441d-b53d-40845576b0fe" id="sec.357" provision.type="other" spent.amends="0"><no>357</no><heading guid="_ebde60c3-d4c9-49c8-8ede-3213c52406ce" id="sec.357-he">Provisions of petroleum lease</heading><subclause affected.by.uncommenced="0" guid="_865e812b-8939-4692-a84f-f399cdb7b44e" id="sec.357-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0"><intref check="valid" refid="sec.123" target.guid="_ef44ece4-3399-4e95-8180-52c9dbb8d1b6">Section 123</intref> applies to the granting of the lease as if the petroleum lease application were an ATP-related application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_10db0f18-6b90-491b-b98e-06312beaa1e4" id="sec.357-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In deciding the provisions of the petroleum lease, the following matters must also be considered—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a6ad3d40-e809-412f-bd98-80dc965f5395" id="sec.357-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the conditions of the relevant mining lease;</txt></block></li><li guid="_0ca8e5da-d984-43a3-b4d6-4e6cb40465e2" id="sec.357-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the development plan for the relevant mining lease;</txt></block></li><li guid="_db05b413-4ad1-41c5-9554-c69af45ec2bb" id="sec.357-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the area of the petroleum lease will include overlapping ATP land—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5107f009-cca5-45fc-aa0a-70a669c7a059" id="sec.357-ssec.2-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the legitimate business interests, rights and future development proposals of the authority to prospect holder; and</txt></block></li><li guid="_69ca9328-44cd-4f58-b136-4db3c392ad80" id="sec.357-ssec.2-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the likelihood of coordinated production of petroleum in relation to the overlapping ATP land being subject to an agreement under <intref check="valid" refid="sec.364" target.guid="_8c723f18-f87b-4879-9b05-d58ccf23a408">section 364</intref><intref check="valid" refid="sec.364-ssec.2" target.guid="_a47f6bde-45bb-4a26-905a-5c2f1770a27b">(2)</intref>.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a188cb51-f68f-4f2b-be1f-a67c291a13da" id="sec.357-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A relinquishment condition may be imposed.</txt><note guid="_942e599d-f88d-49fc-a01b-869662850bfa" id="sec.357-ssec.3-note" type="example"><heading guid="_cc0bcb8c-43d7-4c74-b607-e952636ddeaf" id="sec.357-ssec.3-note-he">Note—</heading><block><txt break.before="1">See however <intref check="valid" refid="sec.368" target.guid="_f021c412-8ba2-4667-a5fb-f133e5ab8014">section 368</intref> (Cessation of relinquishment condition for area not overlapping with coal or oil shale exploration tenement).</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_7cd59cf4-6340-420a-839e-6c6e1438b3a5" id="sec.357-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0"><intref check="valid" refid="sec.357-ssec.3" target.guid="_a188cb51-f68f-4f2b-be1f-a67c291a13da">Subsection (3)</intref> does not limit any power under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref> to impose conditions on the petroleum lease.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_524d4f73-dd39-49b3-b4c7-37b171f90dd6" id="ch.3-pt.4"><no>Part 4</no><heading guid="_cc071d98-d4a6-4481-b918-6dc8b118c3aa" id="ch.3-pt.4-he">Additional provisions for authorities to prospect and data acquisition authorities</heading><division affected.by.uncommenced="0" guid="_50122dbe-1b3b-44d2-8305-3d98a945d7cc" id="ch.3-pt.4-div.1"><no>Division 1</no><heading guid="_3a9d32fb-108c-438e-87ee-eb3255fd267f" id="ch.3-pt.4-div.1-he">Grant of authority to prospect in area of coal or oil shale exploration tenement</heading><clause affected.by.uncommenced="0" guid="_a24803f3-5bed-4056-b14d-b0c40d2d09a9" id="sec.358" provision.type="other" spent.amends="0"><no>358</no><heading guid="_c4875a68-4543-48d1-9cd9-b784df3a48d8" id="sec.358-he">Provisions for authority to prospect</heading><subclause affected.by.uncommenced="0" guid="_99220917-c199-4677-abbc-1f8423b2a71a" id="sec.358-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref> does not limit or otherwise affect the power under this Act to grant an authority to prospect over land (the <defterm guid="_d982c812-5127-4afa-8974-719db0206879" id="sec.358-def.overlappingland" type="definition">overlapping land</defterm>) in the area of a coal or oil shale exploration tenement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0d1a0b1e-afcf-4bed-8ae7-9f1bc442f63a" id="sec.358-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, an authorised activity for the authority to prospect can not be carried out on the overlapping land if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_255d0e29-d7fb-4c9b-8cec-6028149ae830" id="sec.358-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">carrying it out adversely affects the carrying out of an authorised activity for the coal or oil shale exploration tenement; and</txt></block></li><li guid="_d1851984-1ea8-45a6-8c5d-d734a8413d13" id="sec.358-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the authorised activity for the coal or oil shale exploration tenement has already started.</txt></block></li></list></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_eda1a8d6-2c2a-455e-ac73-462969bb7c7b" id="ch.3-pt.4-div.2"><no>Division 2</no><heading guid="_38532802-b2e9-40b6-958f-d4000fceadbd" id="ch.3-pt.4-div.2-he">Restriction on authorised activities on coal mining lease or oil shale mining lease land</heading><clause affected.by.uncommenced="0" guid="_3bc9c48d-448a-4ead-8ff9-e36a504cd0fb" id="sec.359" provision.type="other" spent.amends="0"><no>359</no><heading guid="_416d14c0-384c-4145-9802-4b617ce922b4" id="sec.359-he">Application of <intref check="valid" refid="ch.3-pt.4-div.2" target.guid="_eda1a8d6-2c2a-455e-ac73-462969bb7c7b">div 2</intref></heading><block><txt break.before="1">This division applies if land in the area of a coal or oil shale mining lease is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_42b05900-7432-4fdb-a092-210d20f6da18" id="sec.359-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in the area of an authority to prospect; or</txt></block></li><li guid="_03ae6c60-075e-4385-8a5c-e8583b43df3e" id="sec.359-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">subject to a data acquisition authority.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_685e837d-ede2-4a65-b138-f2d9cdee02f0" id="sec.360" provision.type="other" spent.amends="0"><no>360</no><heading guid="_c04c9b6d-640e-4534-b2b7-42265a8879e4" id="sec.360-he">Restriction</heading><subclause affected.by.uncommenced="0" guid="_d6512024-761a-4499-930b-2961c5e51932" id="sec.360-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An authorised activity for the authority may be carried out on the land only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_aeb4fed5-f17c-4d41-9a54-9798dfae9bc9" id="sec.360-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the mining lease holder has agreed in writing to the carrying out of the activity and to the safety management system of the authority holder; and</txt></block></li><li guid="_e609ed54-6a02-49eb-aed9-6481aeec6516" id="sec.360-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a copy of the agreement has been lodged; and</txt></block></li><li guid="_2611b82e-16e6-4f65-bf72-b530e4758761" id="sec.360-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the agreement is still in force.</txt></block></li></list><note guid="_5e4006fe-b8a4-48be-b534-4faa52e2652a" id="sec.360-ssec.1-note" type="example"><heading guid="_bd2f5346-6af2-4437-826a-5605dd04d5fc" id="sec.360-ssec.1-note-he">Note—</heading><block><txt break.before="1">See also the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.403" target.doc.id="act-1989-110" target.guid="_acc1b576-5463-4539-9121-24fca0813d33" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 403</legref> (Offences regarding land subject to mining claim or mining lease).</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_06f7fdc0-5ed4-4ab5-b39b-4d3e2ec6cbbc" id="sec.360-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.360-ssec.1" target.guid="_d6512024-761a-4499-930b-2961c5e51932">Subsection (1)</intref> does not apply, or ceases to apply, if the same person holds the authority and the mining lease.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_ba61d28d-f623-4216-ab6f-e8d20ec27311" id="ch.3-pt.4-div.3"><no>Division 3</no><heading guid="_87266196-df78-4d2e-a9cd-322e12327295" id="ch.3-pt.4-div.3-he">Exceptions to particular area provisions</heading><clause affected.by.uncommenced="0" guid="_d1014ab7-fc0a-42a5-aebd-9c7f8fe24edb" id="sec.361" provision.type="other" spent.amends="0"><no>361</no><heading guid="_210265a8-fdce-4d22-9c00-34b59d749d50" id="sec.361-he">Exceptions</heading><block><txt break.before="1"><intref check="valid" refid="sec.98" target.guid="_d8fa1eb9-e567-4ac1-aeb1-e74a6cf013c1">Section 98</intref><intref check="valid" refid="sec.98-ssec.4" target.guid="_5a9d3dde-dc33-4db8-9f96-d6af45b5bb38">(4)</intref> and <intref check="valid" refid="sec.101" target.guid="_ecb16f24-7357-4c3c-87b6-6fbc88f80008">101</intref> do not apply for an authority to prospect if the petroleum lease is granted under <intref check="valid" refid="ch.3-pt.2" target.guid="_60586bec-2198-4a1a-9860-a488c272707c">part 2</intref>, <intref check="valid" refid="ch.3-pt.2-div.2" target.guid="_f13bd9b3-11be-4097-b13c-8f1d8ff3b62b">division 2</intref> or <intref check="valid" refid="ch.3-pt.3" target.guid="_e9bc49f9-3a04-49d3-b854-498473bad865">part 3</intref>, <intref check="valid" refid="ch.3-pt.3-div.3" target.guid="_21ca4657-89d9-4466-baea-a0479db6b7f2">division 3</intref>.</txt></block></clause></division><division affected.by.uncommenced="0" guid="_05c78981-f7e7-4468-94ee-9e7bfbc35754" id="ch.3-pt.4-div.4"><no>Division 4</no><heading guid="_fae0ed17-8276-4616-84a0-1a56f261135b" id="ch.3-pt.4-div.4-he">Conditions</heading><clause affected.by.uncommenced="0" guid="_95e9c286-ea94-4d52-af71-6fa22c4084f4" id="sec.362" provision.type="other" spent.amends="0"><no>362</no><heading guid="_755edff5-5366-4af9-909f-37d3fb60b64d" id="sec.362-he">Notice to coal or oil shale exploration tenement holders and applicants</heading><subclause affected.by.uncommenced="0" guid="_5fa89acd-53c1-4b11-ab3c-16a82af62d7a" id="sec.362-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, when an authority to prospect is granted, land in the area of the authority is in the area of a coal or oil shale exploration tenement or a proposed area under a coal or oil shale exploration tenement application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a6be7f3f-fe3f-4733-9053-9ff780477c0a" id="sec.362-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">It is a condition of the authority that its holder must, within 20 business days after the holder receives notice of the grant, give the tenement holder or the applicant notice stating—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_62f0bf40-09c1-4d56-9e5e-2083b67b8aff" id="sec.362-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that the authority has been granted; and</txt></block></li><li guid="_3e098282-a004-4e8e-8afb-f962357cf3a4" id="sec.362-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the authority holder’s name; and</txt></block></li><li guid="_a818a804-b82f-4d30-b27b-5534e3142014" id="sec.362-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the term of the authority.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_761b22b8-9aa1-46b8-ab7f-63fbf6ace0b5" id="sec.363" provision.type="other" spent.amends="0"><no>363</no><heading guid="_9bf63a73-32c5-41ee-bacb-8e866b5cfd9a" id="sec.363-he">Compliance with obligations under <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref></heading><block><txt break.before="1">If an obligation under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.318AW" target.doc.id="act-1989-110" target.guid="_f1122f40-2791-4fc5-a1eb-439cd4724aec" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 318AW</legref> or <legref check="valid" jurisd="QLD" refid="sec.318DB" target.doc.id="act-1989-110" target.guid="_f3106cab-1253-4209-9507-42ae93a275a5" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">318DB</legref>, applies to an authority to prospect holder, it is a condition of the authority that the holder must comply with the obligation.</txt></block></clause></division></part><part affected.by.uncommenced="0" guid="_34c536ba-d768-4ec0-a202-efadfb15c15d" id="ch.3-pt.4A"><no>Part 4A</no><heading guid="_55952949-2e38-4cfd-86fe-16a2f105e587" id="ch.3-pt.4A-he">Additional provisions if overlapping mineral (f) pilot tenure</heading><division affected.by.uncommenced="0" guid="_4bab3676-25c2-4ed8-892c-52d5d34a7201" id="ch.3-pt.4A-div.1"><no>Division 1</no><heading guid="_0e0ee532-f69d-4c8a-8e95-bc4147af97f1" id="ch.3-pt.4A-div.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_3cfc2170-6aa3-4279-be07-d1506d954db7" id="sec.363A" provision.type="other" spent.amends="0"><no>363A</no><heading guid="_f7821bd0-77bd-4f07-882a-f455412939a4" id="sec.363A-he">Definitions for <intref check="valid" refid="ch.3-pt.4A" target.guid="_34c536ba-d768-4ec0-a202-efadfb15c15d">pt 4A</intref></heading><block><txt break.before="1">In this part—</txt><deflist><definition affected.by.uncommenced="0" guid="_8c8f51b8-e260-4681-a2b2-a9057b86a363" id="sec.363A-def.MDLA407_"><txt break.before="1"><defterm guid="_612eefdd-b084-4fae-b217-57e53c540959" id="sec.363A-def.MDLA407" type="definition">MDLA 407</defterm> see <intref check="valid" refid="sec.363B" target.guid="_a45dc9ac-29cb-4156-b8c7-ba91308a76e4">section 363B</intref><intref check="valid" refid="sec.363B-ssec.2" target.guid="_08162d04-2292-4165-ae7c-5721f6891a62">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_ed9768cd-0fe4-4566-8c13-c067a6a111c1" id="sec.363A-def.mineralfpilottenure_"><txt break.before="1"><defterm guid="_7f8016be-1e5e-4c7d-a3a1-e38dc843cd49" id="sec.363A-def.mineralfpilottenure" type="definition">mineral (f) pilot tenure</defterm> see <intref check="valid" refid="sec.363B" target.guid="_a45dc9ac-29cb-4156-b8c7-ba91308a76e4">section 363B</intref><intref check="valid" refid="sec.363B-ssec.1" target.guid="_0e67b7f0-2724-4884-a48c-a30323155801">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_04bff7fa-bb75-4ab4-8477-d5d152fc2df9" id="sec.363A-def.mineralfproductiontenure_"><txt break.before="1"><defterm guid="_2f6f645d-b7c3-47bc-9ba1-ec9e6bf4307e" id="sec.363A-def.mineralfproductiontenure" type="definition">mineral (f) production tenure</defterm>, for overlapping mineral (f) land, means a tenure that authorises the production of mineral (f) for the land.</txt></definition><definition affected.by.uncommenced="0" guid="_ca2b74d1-6efa-4d8f-8010-33a61122599b" id="sec.363A-def.mineralftenure_"><txt break.before="1"><defterm guid="_16e1a42a-3bf7-4aa6-b29c-b3117b1eb7b3" id="sec.363A-def.mineralftenure" type="definition">mineral (f) tenure</defterm> means a mineral (f) pilot tenure or a mineral (f) production tenure.</txt></definition><definition affected.by.uncommenced="0" guid="_8612d79d-5763-4641-912f-d2bf6e9d683f" id="sec.363A-def.overlappingmineralfland_"><txt break.before="1"><defterm guid="_b666278d-03e1-4916-89af-7effddd0fa97" id="sec.363A-def.overlappingmineralfland" type="definition">overlapping mineral (f) land</defterm> see <intref check="valid" refid="sec.363B" target.guid="_a45dc9ac-29cb-4156-b8c7-ba91308a76e4">section 363B</intref><intref check="valid" refid="sec.363B-ssec.1" target.guid="_0e67b7f0-2724-4884-a48c-a30323155801">(1)</intref>.</txt></definition></deflist></block></clause><clause affected.by.uncommenced="0" guid="_a45dc9ac-29cb-4156-b8c7-ba91308a76e4" id="sec.363B" provision.type="other" spent.amends="0"><no>363B</no><heading guid="_fb6b8c64-ee68-4ced-8c3e-c6c5b3cc0ad9" id="sec.363B-he">Application of <intref check="valid" refid="ch.3-pt.4A" target.guid="_34c536ba-d768-4ec0-a202-efadfb15c15d">pt 4A</intref></heading><subclause affected.by.uncommenced="0" guid="_0e67b7f0-2724-4884-a48c-a30323155801" id="sec.363B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This part applies to land (<defterm guid="_c400c62f-74e5-4181-9e75-a80b9fe2abf1" id="sec.363B-def.overlappingmineralfland" type="definition">overlapping mineral (f) land</defterm>) in the area of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_55fb3579-7819-4ebf-b36b-9d68cf0e52b0" id="sec.363B-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">mineral development licence 309, 374 or 385 (a <defterm guid="_0e29d7a8-472c-4e79-b3a7-c8b9ab5d1a29" id="sec.363B-ssec.1-def.mineralfpilottenure" type="definition">mineral (f) pilot tenure</defterm>); or</txt></block></li><li guid="_24af18de-8cc3-4871-a156-04211a5013c8" id="sec.363B-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any mineral (f) production tenure granted for land in the area of a mineral development licence mentioned in <intref check="valid" refid="sec.363B-ssec.1-para1.a" target.guid="_55fb3579-7819-4ebf-b36b-9d68cf0e52b0">paragraph (a)</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_08162d04-2292-4165-ae7c-5721f6891a62" id="sec.363B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">This part also applies to land the subject of mineral development licence application 407 (<defterm guid="_7a5a4574-919f-4c55-9d01-9c4d449047b7" id="sec.363B-def.MDLA407" type="definition">MDLA 407</defterm>).</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_adcdf90a-9fcc-4abc-8b2a-92b21e0d72f3" id="sec.363C" provision.type="other" spent.amends="0"><no>363C</no><heading guid="_5f6773c2-3c82-4bcb-a184-b59413f64eb8" id="sec.363C-he">Relationship with other provisions</heading><subclause affected.by.uncommenced="0" guid="_a37c2941-4d6d-4cf7-801c-dbc57af35c45" id="sec.363C-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This part applies despite—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2516847d-2b92-4315-b201-e6ba546c81ac" id="sec.363C-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">other provisions of this chapter or the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>; and</txt></block></li><li guid="_229961de-171a-4657-8fd3-dd5f0424b3ff" id="sec.363C-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the conditions or other provisions of an authority to prospect.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_462d35cc-87d0-416d-a334-60edb5e8082e" id="sec.363C-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If this part conflicts with another provision of this chapter or the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, this part prevails to the extent of the inconsistency.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_7bdda37f-999a-49b3-97b2-d2e022e54356" id="ch.3-pt.4A-div.2"><no>Division 2</no><heading guid="_d262ad24-c380-4ab0-8a2b-57bfbc330bf9" id="ch.3-pt.4A-div.2-he">General suspension</heading><clause affected.by.uncommenced="0" guid="_5ca94c63-ee0d-42ba-9a90-5e2b2146d60d" id="sec.363D" provision.type="other" spent.amends="0"><no>363D</no><heading guid="_3285ae15-af3b-4aa1-9302-560465137e77" id="sec.363D-he">Suspension of authorised activities for authority to prospect</heading><subclause affected.by.uncommenced="0" guid="_004fb048-d316-4903-a771-d973c5a333f4" id="sec.363D-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to an authorised activity for an authority to prospect in the area of overlapping mineral (f) land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_184f81da-3c37-49e6-908c-1fd9c487e69b" id="sec.363D-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.363D-ssec.3" target.guid="_28c5b551-fb90-4040-8454-f6b2c8cf6ff3">subsection (3)</intref> and <intref check="valid" refid="sec.363E" target.guid="_99a74ab4-25c2-41d3-8e7a-8937c602f898">section 363E</intref>, any right to carry out the activity on the overlapping mineral (f) land is suspended.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_28c5b551-fb90-4040-8454-f6b2c8cf6ff3" id="sec.363D-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">During the suspension, the authority holder may carry out an authorised activity for the authority on the overlapping mineral (f) land only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3ca4b48e-0bd7-43e4-9e59-2d1956362569" id="sec.363D-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the mineral (f) tenure holder for the land has agreed in writing to the carrying out of the activity; and</txt></block></li><li guid="_ea0576c5-e9ab-4cea-b9df-d08933036121" id="sec.363D-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a copy of the agreement has been lodged; and</txt></block></li><li guid="_726237e9-763c-4f53-aa03-ba8abf81de09" id="sec.363D-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the agreement is still in force.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5808640a-5258-4f3d-bc91-965872efd1a0" id="sec.363D-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The suspension continues until the mineral (f) tenure ends.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_99a74ab4-25c2-41d3-8e7a-8937c602f898" id="sec.363E" provision.type="other" spent.amends="0"><no>363E</no><heading guid="_a0576d25-9eec-4ee7-ae2a-a268039a329f" id="sec.363E-he">Entry rights for particular activities during suspension</heading><subclause affected.by.uncommenced="0" guid="_a6ee53b9-ca92-4253-b335-a0d04643c847" id="sec.363E-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An authority to prospect holder to whom <intref check="valid" refid="sec.363D" target.guid="_5ca94c63-ee0d-42ba-9a90-5e2b2146d60d">section 363D</intref> applies may, without an agreement mentioned in that section, enter the overlapping mineral (f) land to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_eaa9b081-d52f-4794-ab04-e905c99e32ac" id="sec.363E-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">carry out rehabilitation or environmental management required of the holder under any relevant environmental requirement under the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act"><name emphasis="no">Environmental Protection Act</name></legref>; or</txt></block></li><li guid="_3e916788-cb55-4f2a-8535-db933e114670" id="sec.363E-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">carry out low impact environmental monitoring; or</txt><note guid="_6e9558e6-07d8-41ee-a060-bf04da480fba" id="sec.363E-ssec.1-para1.b-note" type="example"><heading guid="_c84cabb6-5f5a-4b0d-baea-309a56a7ed67" id="sec.363E-ssec.1-para1.b-note-he">Examples—</heading><block><txt break.before="1">the monitoring of air, ecology, fauna, hydrology, soil or water</txt></block></note></block></li><li guid="_975b6e9c-4072-4f9d-8d4d-5a7c040fec6b" id="sec.363E-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">move, remove or maintain equipment, machinery or plant; or</txt></block></li><li guid="_1e71fc55-467b-4263-9761-84e7fca6751a" id="sec.363E-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">carry out improvement restoration for the authority to prospect; or</txt></block></li><li guid="_854b91ed-c832-4dc7-bdd8-dfc8ffe80438" id="sec.363E-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">carry out care and maintenance of disturbed areas; or</txt></block></li><li guid="_1525c797-ab25-42f1-b90b-86fef251de0e" id="sec.363E-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">carry out low impact track construction or maintenance; or</txt></block></li><li guid="_e20ddf5b-e50f-478c-85ea-8746c315fb0a" id="sec.363E-ssec.1-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">use or maintain infrastructure put in place on the land before the commencement of this section; or</txt></block></li><li guid="_79e2631b-4c82-40c9-9ce2-6af1bd50572f" id="sec.363E-ssec.1-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">put in place or maintain infrastructure for a purpose, or to do an activity, mentioned in <intref check="valid" refid="sec.363E-ssec.1-para1.d" target.guid="_1e71fc55-467b-4263-9761-84e7fca6751a">paragraphs (d)</intref> to <intref check="valid" refid="sec.363E-ssec.1-para1.g" target.guid="_e20ddf5b-e50f-478c-85ea-8746c315fb0a">(g)</intref>; or</txt></block></li><li guid="_8b4de631-ca41-4a91-8899-c6361ed0b261" id="sec.363E-ssec.1-para1.i" provision.type="other"><no>(i)</no><block><txt break.before="0">construct pipelines for transporting water in the area of mineral development licence 374 for infrastructure mentioned in <intref check="valid" refid="sec.363E-ssec.1-para1.g" target.guid="_e20ddf5b-e50f-478c-85ea-8746c315fb0a">paragraph (g)</intref>, if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_704ae487-024a-4ece-84fb-753f6849107c" id="sec.363E-ssec.1-para1.i-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the construction is an authorised activity for the authority to prospect; and</txt></block></li><li guid="_e48623da-cd9f-4aae-b6d2-2a8ca7626260" id="sec.363E-ssec.1-para1.i-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the mineral (f) tenure holder for the land has agreed in writing to the location of the pipelines; and</txt></block></li><li guid="_ccf0b4a9-79d8-472f-b1d7-9f2add02c898" id="sec.363E-ssec.1-para1.i-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">a copy of the agreement has been lodged; and</txt></block></li><li guid="_dda2feba-6416-4a02-b055-cd3461d54778" id="sec.363E-ssec.1-para1.i-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">the agreement is still in force.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5eb0d4d3-64b3-44fe-b4e5-28e28ac2ab59" id="sec.363E-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.363E-ssec.1" target.guid="_a6ee53b9-ca92-4253-b335-a0d04643c847">Subsection (1)</intref> is subject to <intref check="valid" refid="sec.363F" target.guid="_a06d2c9d-3f8d-42aa-96b9-91275220ad0d">section 363F</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a03bc43d-84f8-4c9a-b579-13b29fc11230" id="sec.363E-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The authority holder’s rights and obligations under the rest of this Act continue to apply for an entry and the carrying out of an activity authorised under <intref check="valid" refid="sec.363E-ssec.1" target.guid="_a6ee53b9-ca92-4253-b335-a0d04643c847">subsection (1)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1152b8cd-3ed5-4499-bb6a-2046ff38dc93" id="sec.363E-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_0e4433d8-eb60-492a-ac1e-644932bc6f7e" id="sec.363E-ssec.4-def.improvementrestoration_"><txt break.before="1"><defterm guid="_dcc3fd6b-74b2-4d96-8501-146eb2615fb6" id="sec.363E-ssec.4-def.improvementrestoration" type="definition">improvement restoration</defterm>, for an authority to prospect, means the repair of any damage caused by an activity under the authority to all pre-existing improvements on, or attached to, the land subject to the authority by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_443a9f4d-c63c-4eec-b04b-6fbfaecb3c41" id="sec.363E-ssec.4-def.improvementrestoration-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">restoring them to the same, or substantially the same, condition they were in before the damage happened; or</txt></block></li><li guid="_9fb02535-a1af-48ac-a4a8-9996bdc22cd9" id="sec.363E-ssec.4-def.improvementrestoration-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">replacing them with another improvement in the condition mentioned in <intref check="valid" refid="sec.363E-ssec.4-def.improvementrestoration-para1.a" target.guid="_443a9f4d-c63c-4eec-b04b-6fbfaecb3c41">paragraph (a)</intref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_3e242a3d-3ef3-4ee9-ae6e-425ba0d06553" id="sec.363E-ssec.4-def.restofthisAct_"><txt break.before="1"><defterm guid="_f39449e0-8794-4b51-823a-4ebd5a10d1c4" id="sec.363E-ssec.4-def.restofthisAct" type="definition">rest of this Act</defterm> means the provisions of this Act other than this part.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a06d2c9d-3f8d-42aa-96b9-91275220ad0d" id="sec.363F" provision.type="other" spent.amends="0"><no>363F</no><heading guid="_f5a16e08-f336-4783-a508-87dfdd047c16" id="sec.363F-he">Notice of entry under <intref check="valid" refid="sec.363E" target.guid="_99a74ab4-25c2-41d3-8e7a-8937c602f898">s 363E</intref></heading><block><txt break.before="1">Before entering land under <intref check="valid" refid="sec.363E" target.guid="_99a74ab4-25c2-41d3-8e7a-8937c602f898">section 363E</intref><intref check="valid" refid="sec.363E-ssec.1" target.guid="_a6ee53b9-ca92-4253-b335-a0d04643c847">(1)</intref>, an authority to prospect holder must, at least 10 business days before the entry, give the mineral (f) tenure holder for the land a notice stating the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7663d29e-0661-4c77-989b-19eff5ad7ccc" id="sec.363F-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the area of the overlapping mineral (f) land proposed to be entered;</txt></block></li><li guid="_aa4fc7a6-800b-4f99-801f-ab21e49edb30" id="sec.363F-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the period during which the land will be entered (the <defterm guid="_25a68898-4db5-4a70-9a6d-5b65293c86b2" id="sec.363F-def.entryperiod" type="definition">entry period</defterm>);</txt></block></li><li guid="_cee10a45-ff23-4c60-b65d-4e4e44c2834a" id="sec.363F-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the activities proposed to be carried out on the land under <intref check="valid" refid="sec.363E" target.guid="_99a74ab4-25c2-41d3-8e7a-8937c602f898">section 363E</intref><intref check="valid" refid="sec.363E-ssec.1" target.guid="_a6ee53b9-ca92-4253-b335-a0d04643c847">(1)</intref>;</txt></block></li><li guid="_8881ef1f-7c3c-46f3-b17a-fc76efd5d278" id="sec.363F-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">when and where the activities are proposed to be carried out.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_c0cf3813-75d5-45e9-988c-ac2848b584d0" id="sec.363G" provision.type="other" spent.amends="0"><no>363G</no><heading guid="_90dee2b5-21ab-4016-9b50-867bb6d5254d" id="sec.363G-he">Ministerial power to suspend authority to prospect requirements</heading><subclause affected.by.uncommenced="0" guid="_ee14f8e5-12a5-43bb-a97e-652ef270e9db" id="sec.363G-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the Minister is satisfied that, because of <intref check="valid" refid="sec.363D" target.guid="_5ca94c63-ee0d-42ba-9a90-5e2b2146d60d">section 363D</intref>, the holder of an authority to prospect is not able to, or will not be able to, carry out all or any authorised activities for the authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8da0fc14-b15c-4cfe-8cb5-3c4b5c0a39ad" id="sec.363G-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister may, by giving notice to the authority holder, decide to suspend or limit any of the performance requirements for the authority to prospect, for all or part of the term of the authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_05579560-71c8-4537-a4d2-9c30c4fad8ad" id="sec.363G-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">During the suspension or limitation, the obligation does not apply to the extent of the suspension or limitation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_65f92054-c9cd-4bf2-a58c-0da5289e192b" id="sec.363G-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_31af2912-59f6-49f1-983a-7984d593d4d3" id="sec.363G-ssec.4-def.performancerequirement_"><txt break.before="1"><defterm guid="_7c28f740-9f0f-404e-a6cf-872c4eb2f6e3" id="sec.363G-ssec.4-def.performancerequirement" type="definition">performance requirement</defterm> means an obligation under this Act or a condition of an authority to prospect, and includes an obligation about relinquishment.</txt></definition></deflist></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_7ba6cdd3-99dd-4d86-941f-ab10aeee6ea0" id="ch.3-pt.4A-div.3"><no>Division 3</no><heading guid="_0165a344-b13d-4e8e-8a30-1e45e03800cd" id="ch.3-pt.4A-div.3-he">Resolving disputes</heading><clause affected.by.uncommenced="0" guid="_9f18a786-ae73-4ef7-b60b-7fd406529b54" id="sec.363H" provision.type="other" spent.amends="0"><no>363H</no><heading guid="_6b7a6caa-d27b-4bb0-8724-07d1236ea765" id="sec.363H-he">Negotiation and request to Minister</heading><subclause affected.by.uncommenced="0" guid="_184bf5cf-4bb1-4a32-af4a-6074462d3802" id="sec.363H-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if there is a dispute about any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_97f945fb-0c2a-4e3f-8d25-61db7c58a748" id="sec.363H-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a right to carry out an authorised activity under <intref check="valid" refid="sec.363D" target.guid="_5ca94c63-ee0d-42ba-9a90-5e2b2146d60d">section 363D</intref>;</txt></block></li><li guid="_0c19d927-2954-4738-8169-41e760f5ded5" id="sec.363H-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a right to enter overlapping mineral (f) land under <intref check="valid" refid="sec.363E" target.guid="_99a74ab4-25c2-41d3-8e7a-8937c602f898">section 363E</intref>;</txt></block></li><li guid="_1694cf40-91dc-4753-a20b-8bd440e0c391" id="sec.363H-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">any request made by a mineral (f) tenure holder to an authority to prospect holder to remove or modify infrastructure on overlapping mineral (f) land, if the infrastructure was put in place on the land under—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7bbf9d46-2c91-4284-81c1-e78a86fc2da1" id="sec.363H-ssec.1-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">an agreement entered into under <intref check="valid" refid="sec.363D" target.guid="_5ca94c63-ee0d-42ba-9a90-5e2b2146d60d">section 363D</intref><intref check="valid" refid="sec.363D-ssec.3" target.guid="_28c5b551-fb90-4040-8454-f6b2c8cf6ff3">(3)</intref>; or</txt></block></li><li guid="_32ec80e6-3d26-4095-af22-246c17358700" id="sec.363H-ssec.1-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0"><intref check="valid" refid="sec.363E" target.guid="_99a74ab4-25c2-41d3-8e7a-8937c602f898">section 363E</intref><intref check="valid" refid="sec.363E-ssec.1" target.guid="_a6ee53b9-ca92-4253-b335-a0d04643c847">(1)</intref>.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_65dc4a41-7753-4406-a60a-834394034dda" id="sec.363H-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The parties must use all reasonable endeavours to attempt to resolve the dispute.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_21c7c7de-1fa6-4d0b-bd34-d51cc3929a1a" id="sec.363H-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">After complying with <intref check="valid" refid="sec.363H-ssec.2" target.guid="_65dc4a41-7753-4406-a60a-834394034dda">subsection (2)</intref>, either of the parties may, by a notice in the approved form, ask the Minister to decide whether the entry is allowed or the activity may be carried out.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9117c427-b09f-4638-aba6-9b0715248463" id="sec.363H-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Before making a decision, the Minister must give the parties an opportunity to make submissions about the request within a reasonable period.</txt><note guid="_1c9ca52b-f0db-4d3c-a059-f9f5ad0497f9" id="sec.363H-ssec.4-note" type="example"><heading guid="_69ed0846-4d8f-41c1-af6c-d33085a178db" id="sec.363H-ssec.4-note-he">Note—</heading><block><txt break.before="1">For other relevant provisions about making a submission, see <intref check="valid" refid="sec.851AA" target.guid="_1bb215c0-29c7-436b-85d1-d8220a60416c">section 851AA</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_0ffdca6f-3359-4936-9691-7a8882bb4a76" id="sec.363H-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Also before making the decision, the Minister may refer the dispute under <intref check="valid" refid="sec.363I" target.guid="_1ada3b55-b9b7-47e4-aa85-2f5e05e408a1">section 363I</intref> to the Land Court for it to make recommendations about deciding the dispute.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1ada3b55-b9b7-47e4-aa85-2f5e05e408a1" id="sec.363I" provision.type="other" spent.amends="0"><no>363I</no><heading guid="_2dc0fc19-6384-4089-95f0-cb2a2de11718" id="sec.363I-he">Reference to Land Court</heading><subclause affected.by.uncommenced="0" guid="_6e38603f-edc9-4f5b-a22e-628a3a4e68ba" id="sec.363I-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A referral by the Minister under <intref check="valid" refid="sec.363H" target.guid="_9f18a786-ae73-4ef7-b60b-7fd406529b54">section 363H</intref><intref check="valid" refid="sec.363H-ssec.5" target.guid="_0ffdca6f-3359-4936-9691-7a8882bb4a76">(5)</intref> must be made by filing a notice in the approved form with the registrar of the Land Court.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_783da41f-1969-479f-af0f-e855f1b66752" id="sec.363I-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The referral starts a proceeding before the Land Court for it to make the recommendations.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_18a10ff0-215d-499d-aeca-2dcd7911b83a" id="sec.363I-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The parties to the proceeding are the mineral (f) tenure holder and the authority to prospect holder for the overlapping mineral (f) land to which the dispute relates.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_885328af-9b92-443a-8fa0-b58dc6e75677" id="sec.363J" provision.type="other" spent.amends="0"><no>363J</no><heading guid="_68ae8252-8300-4f15-97c7-3e0d7680e7d5" id="sec.363J-he">Decision by Minister</heading><subclause affected.by.uncommenced="0" guid="_160cf65b-d765-4d94-814e-f731efbe64a4" id="sec.363J-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister must, after considering the following, decide the matter and give the parties notice of the decision—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_858cb2d9-89db-4941-bcff-e51e79cb98cc" id="sec.363J-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">any submissions made by the parties under <intref check="valid" refid="sec.363H" target.guid="_9f18a786-ae73-4ef7-b60b-7fd406529b54">section 363H</intref><intref check="valid" refid="sec.363H-ssec.4" target.guid="_9117c427-b09f-4638-aba6-9b0715248463">(4)</intref>;</txt></block></li><li guid="_a2e89829-d478-4b88-ac30-7d66ed6b655c" id="sec.363J-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any recommendations by the Land Court.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2a233bef-1628-4f76-bf0a-e152028f087c" id="sec.363J-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In making a decision, the Minister may also consider the public interest.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3465d68b-7995-47c0-8450-3e9dfda812b6" id="sec.363J-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister’s decision binds the parties.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_221a6af4-3abc-4b48-b723-2d1db79f2747" id="sec.363J-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The Minister may impose conditions on any decision that the entry is allowed or the authorised activity may be carried out.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_4e503dc6-f791-4818-8a6d-8516092a5056" id="ch.3-pt.4A-div.4"><no>Division 4</no><heading guid="_18ddf45b-4f1c-4bd1-a2c3-c6d861144f46" id="ch.3-pt.4A-div.4-he">Obtaining petroleum lease if overlapping mineral (f) land or land in area of MDLA 407</heading><clause affected.by.uncommenced="0" guid="_8e01a9a9-1561-44c5-a2b4-959fe5c5966e" id="sec.363K" provision.type="other" spent.amends="0"><no>363K</no><heading guid="_6aee6502-aaa6-4ee8-92f0-c3264fc744a6" id="sec.363K-he">Additional provision about area of petroleum lease</heading><subclause affected.by.uncommenced="0" guid="_8cb51fe6-4669-4ca5-a1f5-a0f40bd9dcfe" id="sec.363K-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_98845260-19a9-4905-8085-e41f479c1437" id="sec.363K-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a person who, under <intref check="valid" refid="sec.117" target.guid="_3f8f9173-3607-43d2-a692-aa8f1a2489e8">section 117</intref>, may make an ATP-related application for land that includes any of the following makes that application—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5e22b14a-2bb9-4f1a-8cd4-703e1ab9bb79" id="sec.363K-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">land that is overlapping mineral (f) land;</txt></block></li><li guid="_6ad02389-3e47-4f2b-abd3-701376b6dd10" id="sec.363K-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">land in the area of MDLA 407; and</txt></block></li></list></block></li><li guid="_1ccc9ad5-616c-46e8-83d2-5ffa46d15365" id="sec.363K-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Minister decides to grant the petroleum lease.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_99d29aff-36cb-4a77-8936-f8da96697e3a" id="sec.363K-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.168" target.guid="_734a0050-dc06-4a36-a451-0fd4eeda33ba">section 168</intref>, the area of the petroleum lease can not include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_71ce8e28-6f3c-4cbd-890e-c58d6134bc6c" id="sec.363K-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the land that is overlapping mineral (f) land; or</txt></block></li><li guid="_327f498c-4315-4312-a1d6-8802f48a015a" id="sec.363K-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">land in the area of MDLA 407.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1c26dda5-39e2-4c2c-8a0f-651e88317146" id="sec.363K-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister may, in the lease, describe the exclusion of the land under <intref check="valid" refid="sec.363K-ssec.2" target.guid="_99d29aff-36cb-4a77-8936-f8da96697e3a">subsection (2)</intref> in a way the Minister considers appropriate.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b51e4bd3-6256-4d2b-89de-4b7cb8a3ed83" id="sec.363L" provision.type="other" spent.amends="0"><no>363L</no><heading guid="_7295b6df-6e09-4da0-bd98-6148f940b040" id="sec.363L-he">Minister may add land to petroleum lease if mineral (f) tenure ends</heading><subclause affected.by.uncommenced="0" guid="_5f26c77e-a571-4cbe-b4c5-4b0cdec433af" id="sec.363L-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a78a8aaa-d413-4e48-98fb-79c0665a3f7f" id="sec.363L-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">land is not included in a petroleum lease because of <intref check="valid" refid="sec.363K" target.guid="_8e01a9a9-1561-44c5-a2b4-959fe5c5966e">section 363K</intref><intref check="valid" refid="sec.363K-ssec.2" target.guid="_99d29aff-36cb-4a77-8936-f8da96697e3a">(2)</intref>; and</txt></block></li><li guid="_b729af2e-2896-4966-b043-4163bfccca1d" id="sec.363L-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the land is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_638eccb6-217d-4aed-ad0d-f737492aa212" id="sec.363L-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">overlapping mineral (f) land—the mineral (f) tenure for the land ends; and</txt></block></li><li guid="_c24e9666-1e51-4b22-93bc-ef38484645e4" id="sec.363L-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">in the area of MDLA 407—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_67595374-aef7-4e6e-a821-83218226691c" id="sec.363L-ssec.1-para1.b-para2.ii-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">the mineral (f) pilot tenure for mineral development licence 309 ends; and</txt></block></li><li guid="_d23d9bd9-5a42-4076-97cc-c9d4d4eac332" id="sec.363L-ssec.1-para1.b-para2.ii-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">a mineral (f) production tenure has not been granted for land in the mineral development licence’s area.</txt></block></li></list></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_bc8365cd-5320-4ec8-9dcc-a6e93fd9b628" id="sec.363L-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister may amend the petroleum lease by adding the land to the lease area if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3ba5fbe7-c4fe-41e6-a60e-65d3d816b918" id="sec.363L-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the lease as amended complies with <intref check="valid" refid="sec.168" target.guid="_734a0050-dc06-4a36-a451-0fd4eeda33ba">section 168</intref>; and</txt></block></li><li guid="_4c76e306-40ab-4da7-a19f-5f7b3295e9b1" id="sec.363L-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the lease holder consents.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a1c24048-148c-4f05-afad-b04bbc48ec47" id="sec.363L-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister may amend the provisions of the lease in a way that reflects the inclusion of the land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1d3e7bac-b0a4-427c-8b51-c8c79ba3b9df" id="sec.363L-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Also, the Minister may give the lease holder a notice—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_78a4608b-dadd-46bd-aff3-c037f356892e" id="sec.363L-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">withdrawing, from a stated day, the approval of the development plan for the lease; and</txt></block></li><li guid="_91a0837c-62e6-4ced-8033-407a17b1a879" id="sec.363L-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">directing the holder to lodge a proposed later development plan for the lease that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4958008c-bf4e-4749-a2d6-4021ac6bf998" id="sec.363L-ssec.4-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">complies with the later development plan requirements; and</txt></block></li><li guid="_4be74e00-11fb-4656-be9e-6edf8aa8c199" id="sec.363L-ssec.4-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">changes the development plan for the lease to reflect the inclusion of the land.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_19f69fe2-50ae-467f-9dc7-963abde38c28" id="sec.363L-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The amended provisions of the lease or the proposed later development plan must not be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_36fdadae-2b24-46d2-b4fa-456ff4e7d6b8" id="sec.363L-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">inconsistent with the mandatory conditions of petroleum leases; or</txt></block></li><li guid="_245f0e7f-5622-4932-aeef-64491193f6d0" id="sec.363L-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the same as, or substantially the same as, or inconsistent with, any relevant environmental condition for the lease.</txt></block></li></list></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_59822ecb-942d-4546-ac03-3b1428443975" id="ch.3-pt.5"><no>Part 5</no><heading guid="_55ca4400-6f78-45ea-bf80-4ac94f28511b" id="ch.3-pt.5-he">Additional provisions for petroleum leases</heading><division affected.by.uncommenced="0" guid="_41279ea8-a7b6-42e9-b6cc-0b6680ceea46" id="ch.3-pt.5-div.1"><no>Division 1</no><heading guid="_ef76b1c0-fb07-4b07-ae9a-5b41c8ff5b58" id="ch.3-pt.5-div.1-he">Restriction on authorised activities for particular petroleum leases</heading><clause affected.by.uncommenced="0" guid="_8c723f18-f87b-4879-9b05-d58ccf23a408" id="sec.364" provision.type="other" spent.amends="0"><no>364</no><heading guid="_5f09231c-cfa4-4807-87ef-20747c34a0e4" id="sec.364-he">Restriction on authorised activities on overlapping ATP land</heading><subclause affected.by.uncommenced="0" guid="_78d1338d-f161-4fee-94c6-07695ca26edc" id="sec.364-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_74ea14ff-8074-484e-9595-ec9428486dc7" id="sec.364-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the area of a petroleum lease includes overlapping ATP land; and</txt><note guid="_9e27ae2b-5f35-4e7e-8b73-0bf9ee0e4501" id="sec.364-ssec.1-para1.a-note" type="example"><heading guid="_00f4abe0-051c-48c7-bfc8-69cd61fca704" id="sec.364-ssec.1-para1.a-note-he">Note—</heading><block><txt break.before="1">Overlapping ATP land includes land in the area of the lease that is excluded land for the authority to prospect. See <intref check="valid" refid="sec.341" target.guid="_ca9c79b0-51b0-4864-85ec-99d9057735be">sections 341</intref><intref check="valid" refid="sec.341-ssec.2" target.guid="_26b49cc0-42ca-43c1-9b1d-b388d95f1682">(2)</intref><intref check="valid" refid="sec.341-ssec.2-para1.c" target.guid="_bc4f5c7f-c21c-4557-9a3a-a9ebfeeb639f">(c)</intref> and <intref check="valid" refid="sec.357" target.guid="_6b48eef6-a08e-441d-b53d-40845576b0fe">357</intref><intref check="valid" refid="sec.357-ssec.2" target.guid="_10db0f18-6b90-491b-b98e-06312beaa1e4">(2)</intref><intref check="valid" refid="sec.357-ssec.2-para1.c" target.guid="_db05b413-4ad1-41c5-9554-c69af45ec2bb">(c)</intref>.</txt></block></note></block></li><li guid="_d21df00b-14d9-4ed6-8f4a-096678b94ad2" id="sec.364-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the petroleum lease was, under <intref check="valid" refid="sec.340" target.guid="_9b3d744f-90d5-4e0b-8afe-68123f993116">section 340</intref> or <intref check="valid" refid="sec.356" target.guid="_962214dc-f85b-4056-b6ea-fb971d628929">356</intref>, granted to someone other than the relevant authority to prospect holder.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a47f6bde-45bb-4a26-905a-5c2f1770a27b" id="sec.364-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The petroleum lease holder may carry out an authorised activity for the petroleum lease on the overlapping ATP land only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f70e5643-8202-40ff-ab16-1baf38bf505c" id="sec.364-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the authority to prospect holder has agreed in writing to the carrying out of the activity and—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6516e016-eef1-478b-94fe-766203e163f7" id="sec.364-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a copy of the agreement has been lodged; and</txt></block></li><li guid="_485cff78-e1f5-49f4-aee6-e244148bbf14" id="sec.364-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the agreement is still in force; or</txt></block></li></list></block></li><li guid="_e6babf50-ce96-4802-a108-57242efb2072" id="sec.364-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the activity relates to incidental coal seam gas mined or to be mined within the mine working envelope.</txt></block></li></list><note guid="_c67c6e1f-b757-4a6f-95da-5e0a150fd618" id="sec.364-ssec.2-note" type="example"><heading guid="_58029358-af3d-4e0c-b2ee-a9a49ae03e78" id="sec.364-ssec.2-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.934" target.guid="_843684ca-024d-4366-9357-0e69570bf9c5">section 934</intref> (Substituted restriction for petroleum leases relating to mineral hydrocarbon mining leases).</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_587b43bc-51df-4369-8d39-75a180807e09" id="sec.364-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_78f4a854-de8b-4ece-a33c-33c777b15fd0" id="sec.364-ssec.3-def.mineworkingenvelope_"><txt break.before="1"><defterm guid="_8ccda68f-7495-4524-97d6-8ee266ea5f85" id="sec.364-ssec.3-def.mineworkingenvelope" type="definition">mine working envelope</defterm> means land that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e3134b88-56dd-43ee-b9f1-08d9597fd46e" id="sec.364-ssec.3-def.mineworkingenvelope-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is in the area of a coal mining lease or an oil shale mining lease the area of which includes the overlapping ATP land; and</txt></block></li><li guid="_7d2a65c5-1435-4a52-ae4c-52579f02b3d1" id="sec.364-ssec.3-def.mineworkingenvelope-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">covers any of the following or is needed for post-production activities—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bcccdb0b-fae9-4d72-9545-b925b8ee5797" id="sec.364-ssec.3-def.mineworkingenvelope-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">past mine workings;</txt></block></li><li guid="_059b31b4-9f6d-4bf8-8bab-108ecf631d2f" id="sec.364-ssec.3-def.mineworkingenvelope-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">current mine workings;</txt></block></li><li guid="_b5339d80-af47-4ffb-8515-941436e25021" id="sec.364-ssec.3-def.mineworkingenvelope-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">mine workings scheduled to be mined within the next 5 years;</txt></block></li><li guid="_133b45b9-c43e-443e-8ff1-5975a393b9cf" id="sec.364-ssec.3-def.mineworkingenvelope-para1.b-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">authorised activities for the mining lease associated with the processing, transportation, storage and use of the incidental coal seam gas produced.</txt></block></li></list></block></li></list></definition></deflist></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_9640ec4b-a424-4eb6-bdfe-0d500cdde4f4" id="ch.3-pt.5-div.2"><no>Division 2</no><heading guid="_7ba242bb-ebed-413e-951f-c03ac7711e30" id="ch.3-pt.5-div.2-he">Conditions</heading><clause affected.by.uncommenced="0" guid="_c3e29c3f-1be1-48c1-a908-5878feaeae02" id="sec.365" provision.type="other" spent.amends="0"><no>365</no><heading guid="_56e58d39-3292-402f-9480-eb4abfe252b8" id="sec.365-he">Continuing requirement for coordination arrangement for particular petroleum leases</heading><subclause affected.by.uncommenced="0" guid="_116530fb-ee80-4fee-bf0d-9ca0ab94ab58" id="sec.365-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b81ca7fa-142e-4b34-af62-ff98e467cee0" id="sec.365-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a petroleum lease is granted over land in the area of a coal or oil shale mining lease and the application for the petroleum lease was not made by or jointly with the mining lease holder; or</txt></block></li><li guid="_6eab2962-67ee-40b6-9062-7691364db64a" id="sec.365-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a petroleum lease holder is a party to a coordination arrangement mentioned in <intref check="valid" refid="sec.379" target.guid="_68888914-e90c-4ed1-a2cc-fde86442bde3">section 379</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2a1168ea-b2de-4e65-8a8f-4dc0a02f1a5a" id="sec.365-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">It is a condition of the petroleum lease that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_802577e1-c704-4df4-a43f-be7d6317cbb8" id="sec.365-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">its holder must continue to be party to a relevant coordination arrangement; and</txt></block></li><li guid="_6952d644-99a8-4c23-9e0c-b15f91abaaad" id="sec.365-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">authorised activities for the petroleum lease must not be carried out if there is no relevant coordination arrangement.</txt></block></li></list><note guid="_65b2e0a0-7321-41f0-9835-fd810a2d1807" id="sec.365-ssec.2-note" type="example"><heading guid="_2411c78c-51a1-4958-b739-c2307901b5f4" id="sec.365-ssec.2-note-he">Note—</heading><block><txt break.before="1">For subleases under a coordination arrangement, see <intref check="valid" refid="sec.238" target.guid="_614b48c3-6ae7-4f6f-8a92-88bb2713852b">section 238</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_23556bc2-9b32-40a6-915b-bad91adf390b" id="sec.365-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_4280a024-d7ec-4231-a070-3e700271bde3" id="sec.365-ssec.3-def.relevantcoordinationarrangement_"><txt break.before="1"><defterm guid="_89a6ede1-3d44-4b40-bb7b-a23bc006bd52" id="sec.365-ssec.3-def.relevantcoordinationarrangement" type="definition">relevant coordination arrangement</defterm> means a coordination arrangement with the mining lease holder about—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4d3b9656-5664-419d-b1a2-54caf83a0a38" id="sec.365-ssec.3-def.relevantcoordinationarrangement-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">petroleum production under the petroleum lease; and</txt></block></li><li guid="_fc29050c-075a-45ae-89f2-357628482bb9" id="sec.365-ssec.3-def.relevantcoordinationarrangement-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">coal or oil shale mining and any incidental coal seam gas mining under the mining lease.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d199bc89-cce1-4043-b628-1a5f918e8f1b" id="sec.366" provision.type="other" spent.amends="0"><no>366</no><heading guid="_304b3ea3-d3f0-4f97-80c2-6bb7df885d06" id="sec.366-he">Compliance with obligation to negotiate with coal or oil shale mining lease applicant</heading><block><txt break.before="1">If the obligation under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.318CA" target.doc.id="act-1989-110" target.guid="_d3442514-c694-47f7-ad4f-4ba836390855" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 318CA</legref>, applies to a petroleum lease holder, it is a condition of the lease that the holder must comply with the obligation.</txt></block></clause><clause affected.by.uncommenced="0" guid="_dcbc48a2-b14d-4ce7-bf78-6e5c7ec32505" id="sec.367" provision.type="other" spent.amends="0"><no>367</no><heading guid="_c9a734f8-5c00-4f82-9044-edb867e40a55" id="sec.367-he">Requirement for giving of copy of relinquishment report</heading><subclause affected.by.uncommenced="0" guid="_f1fd6ac9-7877-41ed-9dbe-d922e48d5585" id="sec.367-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_24547341-2295-41d8-a6a7-229db65f7a0c" id="sec.367-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a petroleum lease holder has, under <intref check="valid" refid="sec.545" target.guid="_c1169e57-0472-4e0d-b8c7-34affed2b490">section 545</intref>, given a report about a relinquishment of part of the area of the lease; and</txt></block></li><li guid="_272ef474-d5d3-47a7-92b7-61c22418c2b2" id="sec.367-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">immediately before the relinquishment, the part included land in the area of a coal or oil shale exploration tenement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_fd357152-7093-415d-bff6-2c8b230f7142" id="sec.367-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The petroleum lease holder must give a copy of the report to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_81e3d0ce-155b-4992-b4a9-bcaea315ebd8" id="sec.367-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the coal or oil shale exploration tenement holder; and</txt></block></li><li guid="_2fb5d692-e77f-412f-9d46-1899d1319703" id="sec.367-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">anyone else who has applied for a mining lease for the part.</txt></block></li></list></block><penalty guid="_589a8214-eb38-47e8-ad68-ee4a998977a3" id="sec.367-ssec.2-pen"><block><txt break.before="1">Maximum penalty—150 penalty units.</txt></block></penalty></subclause></clause><clause affected.by.uncommenced="0" guid="_f021c412-8ba2-4667-a5fb-f133e5ab8014" id="sec.368" provision.type="other" spent.amends="0"><no>368</no><heading guid="_ca3e555a-91c9-416a-9ce3-745ed161b388" id="sec.368-he">Cessation of relinquishment condition for area not overlapping with coal or oil shale exploration tenement</heading><block><txt break.before="1">If—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7f7b5126-5b0b-4e09-be21-a81583b0a35a" id="sec.368-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a petroleum lease contains a relinquishment condition; and</txt></block></li><li guid="_cab3a312-0f87-44cb-81a0-ee1b0b3a28a7" id="sec.368-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">all or part of the area of the lease ceases to be in the area of a coal or oil shale exploration tenement (the <defterm guid="_c68545ef-b356-48f6-848c-5e5ed21ef949" id="sec.368-def.relevantland" type="definition">relevant land</defterm>);</txt></block></li></list></block><block><txt break.before="1">the condition ceases to apply for the relevant land.</txt></block></clause></division><division affected.by.uncommenced="0" guid="_458b8fd5-a549-44ec-a06b-e424d6a833bf" id="ch.3-pt.5-div.3"><no>Division 3</no><heading guid="_033ef8db-bedd-4aeb-9f08-d5313247a824" id="ch.3-pt.5-div.3-he">Amendment of relinquishment condition by application</heading><subdivision affected.by.uncommenced="0" guid="_0a9dbca8-4a1e-4c0f-a706-d3db393e95af" id="ch.3-pt.5-div.3-sdiv.1"><no>Subdivision 1</no><heading guid="_3f6ae767-fd8d-4d73-91d3-87445c3f3b44" id="ch.3-pt.5-div.3-sdiv.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_067d644e-0407-4258-8b64-736b5b2ef1ec" id="sec.369" provision.type="other" spent.amends="0"><no>369</no><heading guid="_158d32c9-93fa-4aca-ab45-227437850cb6" id="sec.369-he">Application of <intref check="valid" refid="ch.3-pt.5-div.3" target.guid="_458b8fd5-a549-44ec-a06b-e424d6a833bf">div 3</intref></heading><block><txt break.before="1">This division applies if a petroleum lease contains a relinquishment condition and all or part of the area of the lease is in the area of a coal or oil shale exploration tenement.</txt></block></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_0b14281d-f96a-4066-b825-26eb95fef2b3" id="ch.3-pt.5-div.3-sdiv.2"><no>Subdivision 2</no><heading guid="_3ceecd72-59d1-4f01-a074-fa73d50b31be" id="ch.3-pt.5-div.3-sdiv.2-he">Making application to amend relinquishment condition</heading><clause affected.by.uncommenced="0" guid="_efc97dcd-1c1c-4d8b-ae15-042d91d5cd37" id="sec.370" provision.type="other" spent.amends="0"><no>370</no><heading guid="_e9144a97-786a-4590-bd3d-458c413351d9" id="sec.370-he">Conditions for applying to amend</heading><subclause affected.by.uncommenced="0" guid="_88f6586b-6c89-4295-ac61-f5411a106126" id="sec.370-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The petroleum lease holder may apply for the Minister to amend the condition if the applicant has, before making the application—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b116bf1f-8d47-47d3-8571-019290248084" id="sec.370-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">made reasonable attempts to consult with the coal or oil shale exploration tenement holder about—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6a5aadc9-26fe-42be-a99b-187f81133246" id="sec.370-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the proposed amendment; and</txt></block></li><li guid="_5c8a47f5-db90-43f7-a3d7-1c8da1ecd913" id="sec.370-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a proposed later development plan for the lease; and</txt></block></li></list></block></li><li guid="_a5f71c40-2244-4045-a607-015093fac0bc" id="sec.370-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">changed the proposed amendment and the proposed later development plan to give effect to any reasonable proposal by the tenement holder that will optimise—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cc143d22-4fb0-42c8-8e40-57cfb278060c" id="sec.370-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">petroleum production under the amended petroleum lease; and</txt></block></li><li guid="_bc51e77b-3bcc-4f7b-a9e8-fcbc6b0174c5" id="sec.370-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">coal, oil shale or incidental coal seam gas mining under any future mining lease over the land.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_36b28521-7fd5-44a8-b7f0-39fce106ee1d" id="sec.370-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.370-ssec.1" target.guid="_88f6586b-6c89-4295-ac61-f5411a106126">subsection (1)</intref><intref check="valid" refid="sec.370-ssec.1-para1.b" target.guid="_a5f71c40-2244-4045-a607-015093fac0bc">(b)</intref> applies only to the extent the provisions are commercially and technically feasible for the applicant.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_06170791-4ccf-467d-a119-e88efbc70399" id="sec.371" provision.type="other" spent.amends="0"><no>371</no><heading guid="_ab2e1094-103e-4a46-9484-3ab62917c6a7" id="sec.371-he">Obligation of coal or oil shale exploration tenement holder to negotiate</heading><block><txt break.before="1">The coal or oil shale exploration tenement holder must, if asked by the petroleum lease holder, make reasonable attempts to reach an agreement with the petroleum lease holder about the matters mentioned in <intref check="valid" refid="sec.370" target.guid="_efc97dcd-1c1c-4d8b-ae15-042d91d5cd37">section 370</intref><intref check="valid" refid="sec.370-ssec.1" target.guid="_88f6586b-6c89-4295-ac61-f5411a106126">(1)</intref><intref check="valid" refid="sec.370-ssec.1-para1.b" target.guid="_a5f71c40-2244-4045-a607-015093fac0bc">(b)</intref> that provides the best resource use outcome without significantly affecting the parties’ rights or interests.</txt><note guid="_7b18ac9b-bf69-4299-a073-d4a5cedfc6c2" id="sec.371-note" type="example"><heading guid="_5eda88b1-f6b4-4d46-9253-1f4abf53ce82" id="sec.371-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="ch.3-pt.8" target.guid="_7848573e-9ea5-49cb-a174-595b65c98b82">part 8</intref> (Confidentiality of information).</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_ca69f628-3c9d-4326-827f-8e1640ad6c55" id="sec.372" provision.type="other" spent.amends="0"><no>372</no><heading guid="_a623b216-a4a6-4998-a9c4-9f97d1fae4c7" id="sec.372-he">Requirements for making application</heading><subclause affected.by.uncommenced="0" guid="_c8738e60-3442-4745-ba0a-6c381dcb5bdd" id="sec.372-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The application must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_74329b10-905a-482a-9360-cf4a596c7f9f" id="sec.372-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li guid="_9142e8a4-ccff-47ab-8c3c-d93b4ebcb1ec" id="sec.372-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state whether or not the development plan for the petroleum lease has been complied with; and</txt></block></li><li guid="_27bcf113-0284-416e-89df-f3fe809a436b" id="sec.372-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the development plan for the lease has not been complied with—state details of, and the reasons for, each noncompliance; and</txt></block></li><li guid="_106d9ae9-58a5-4aaf-9dd0-02bbe8fa55a7" id="sec.372-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">include a CSG statement; and</txt></block></li><li guid="_e28c1608-4074-478f-91c7-641b54865d33" id="sec.372-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">include a proposed later development plan for the lease as amended under <intref check="valid" refid="sec.370" target.guid="_efc97dcd-1c1c-4d8b-ae15-042d91d5cd37">section 370</intref>; and</txt></block></li><li guid="_e7853e38-6e68-4ebe-8508-cdb2437eebdd" id="sec.372-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">include a statement about each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1e9cb93e-37f8-4b01-9956-1d0b17cde5bc" id="sec.372-ssec.1-para1.f-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the details of the consultation carried out under <intref check="valid" refid="sec.370" target.guid="_efc97dcd-1c1c-4d8b-ae15-042d91d5cd37">section 370</intref><intref check="valid" refid="sec.370-ssec.1" target.guid="_88f6586b-6c89-4295-ac61-f5411a106126">(1)</intref><intref check="valid" refid="sec.370-ssec.1-para1.a" target.guid="_b116bf1f-8d47-47d3-8571-019290248084">(a)</intref>;</txt></block></li><li guid="_ef09d730-a8d6-4ad3-ae1e-3c7f80699654" id="sec.372-ssec.1-para1.f-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the results of the consultation;</txt></block></li><li guid="_bea6bdf9-670d-4c67-a8d0-47fc7b389cca" id="sec.372-ssec.1-para1.f-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">whether the proposed development plan includes all provisions proposed by the coal or oil shale exploration tenement holder under <intref check="valid" refid="sec.370" target.guid="_efc97dcd-1c1c-4d8b-ae15-042d91d5cd37">section 370</intref><intref check="valid" refid="sec.370-ssec.1" target.guid="_88f6586b-6c89-4295-ac61-f5411a106126">(1)</intref><intref check="valid" refid="sec.370-ssec.1-para1.b" target.guid="_a5f71c40-2244-4045-a607-015093fac0bc">(b)</intref>;</txt></block></li><li guid="_5f89421d-3da1-4ab6-8a81-e1a4b146694d" id="sec.372-ssec.1-para1.f-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">if the proposed development plan does not include a provision proposed by the tenement holder—why it was not included;</txt></block></li><li guid="_e12434d2-8a74-410d-b083-01c22923ffe9" id="sec.372-ssec.1-para1.f-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">the applicant’s assessment of the potential for the applicant and the tenement holder to make a coordination arrangement about—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_88a2240e-2fca-4767-87c3-dc20ce38d104" id="sec.372-ssec.1-para1.f-para2.v-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">petroleum production under the amended petroleum lease; and</txt></block></li><li guid="_10e3a27f-7b36-4426-a217-e74b3b07cf37" id="sec.372-ssec.1-para1.f-para2.v-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">coal, oil shale or incidental coal seam gas mining under any future mining lease over the land that may be granted to the tenement holder; and</txt></block></li></list></block></li></list></block></li><li guid="_13c2baa5-42d8-4de9-a9b1-5067bedb1f00" id="sec.372-ssec.1-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">be accompanied by the fee prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_dc27e0d9-b5df-4ff3-a570-f8b9899122a8" id="sec.372-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the CSG statement need not include a proposed safety management system.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2c10a61b-0ea2-4071-b990-6e1a66bdaee7" id="sec.373" provision.type="other" spent.amends="0"><no>373</no><heading guid="_0e737f0e-67eb-487c-902f-ea31a666fa38" id="sec.373-he">Notice of application</heading><block><txt break.before="1">The applicant must immediately after making the application give the coal or oil shale exploration tenement holder a copy of the application.</txt></block></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_efcdac94-fad3-4706-a9f3-549786a21bfb" id="ch.3-pt.5-div.3-sdiv.3"><no>Subdivision 3</no><heading guid="_02ba2302-b958-4026-99e1-7f813fe3cab0" id="ch.3-pt.5-div.3-sdiv.3-he">Deciding amendment application</heading><clause affected.by.uncommenced="0" guid="_3282a3a0-8b3e-4eaf-a771-e01e6f8940a9" id="sec.374" provision.type="other" spent.amends="0"><no>374</no><heading guid="_75244487-fd0e-4ef8-a3f4-4c118f757ef1" id="sec.374-he">Submissions by coal or oil shale exploration tenement holder</heading><subclause affected.by.uncommenced="0" guid="_e7309ae7-819b-4b11-b2c0-b36e0b99ab56" id="sec.374-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The coal or oil shale exploration tenement holder may lodge submissions about the application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_91329251-bbb0-4288-8b01-8fd1bdfe54e7" id="sec.374-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the submissions may be lodged only within 20 business days after the holder is, under <intref check="valid" refid="sec.373" target.guid="_2c10a61b-0ea2-4071-b990-6e1a66bdaee7">section 373</intref>, given a copy of the application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3e78fbc1-c3b4-4335-9d49-a7f24b8d0f91" id="sec.374-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The submissions may include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e1cbdbf6-c99b-4cfa-9e22-7fdea7305b85" id="sec.374-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">information about all or any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_be809e0d-a2d1-41bc-bfb4-e104e0fb40b1" id="sec.374-ssec.3-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">exploration carried out under the tenement;</txt></block></li><li guid="_ef53c5cf-5738-4f80-aebd-bc6bde3f7c33" id="sec.374-ssec.3-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the results of the exploration;</txt></block></li><li guid="_81268755-60f0-4367-b829-a05bcb262ecf" id="sec.374-ssec.3-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the prospects for future coal or oil shale mining or incidental coal seam gas mining from the land; or</txt></block></li></list></block></li><li guid="_222dbd45-ad54-4ddf-a7f9-b6ecfdc14550" id="sec.374-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a proposal by the tenement holder for the development of coal or oil shale in the land; or</txt></block></li><li guid="_827987d5-08f0-4e76-ab7e-86863b6efa83" id="sec.374-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">information relevant to the CSG assessment criteria.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a5ab17ad-c5c6-4143-ae9d-acd1591bfeb6" id="sec.374-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The holder must give the applicant a copy of the submissions.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3049f443-c6dd-4257-8975-ecc5d683dc2b" id="sec.374-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In deciding the application, regard must be had to the submissions.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_390777ef-3af7-4449-a614-76b987f1d5f7" id="sec.375" provision.type="other" spent.amends="0"><no>375</no><heading guid="_ce0e6420-0307-4568-906d-2ca3cd85e511" id="sec.375-he">Minister may require further negotiation</heading><subclause affected.by.uncommenced="0" guid="_88436782-386c-414b-aa01-48c658f7ea2f" id="sec.375-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may, by notice, require the applicant to conduct negotiations with the coal or oil shale exploration tenement holder with a view to making changes of a type mentioned in <intref check="valid" refid="sec.370" target.guid="_efc97dcd-1c1c-4d8b-ae15-042d91d5cd37">section 370</intref><intref check="valid" refid="sec.370-ssec.1" target.guid="_88f6586b-6c89-4295-ac61-f5411a106126">(1)</intref><intref check="valid" refid="sec.370-ssec.1-para1.b" target.guid="_a5f71c40-2244-4045-a607-015093fac0bc">(b)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9a8f6df3-5175-4bb6-9e72-e06a1e8646fe" id="sec.375-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The applicant must use all reasonable attempts to comply with the requirement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c220b6eb-9e59-45cf-936e-f2ae38d5403f" id="sec.375-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the Minister is reasonably satisfied the applicant has not complied with the requirement the Minister may decide to refuse the application.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_528f6748-7e0e-4d15-a74e-4d0293a17525" id="sec.376" provision.type="other" spent.amends="0"><no>376</no><heading guid="_a91bda11-64c7-46cb-a0a4-4d44531d892b" id="sec.376-he">Deciding amendment application</heading><subclause affected.by.uncommenced="0" guid="_9d108aa2-43ca-42ce-97c8-3a70accd2942" id="sec.376-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Before deciding to grant the application, the Minister must decide whether to approve the applicant’s proposed later development plan for the petroleum lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1159b393-a4f2-46ef-8c3c-ccc866fa5b29" id="sec.376-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application can not be granted unless the proposed plan has been approved.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6f32509e-38ef-4daf-b3b6-a38eff39c71f" id="sec.376-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0"><intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">Chapter 2</intref>, <intref check="valid" refid="ch.2-pt.2" target.guid="_f0429453-3af6-43cd-a6dd-cfc8b78be0a9">part 2</intref>, <intref check="valid" refid="ch.2-pt.2-div.4" target.guid="_20042571-c618-44c9-9361-f8620ebcf824">division 4</intref> applies for deciding whether to approve the proposed plan.</txt><note guid="_00130971-c0a0-4c63-b595-fb174ec73ac6" id="sec.376-ssec.3-note" type="example"><heading guid="_a9140fe3-b7b6-4a9a-92ce-aad545e14295" id="sec.376-ssec.3-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="ch.3-pt.6" target.guid="_125342c0-5c01-4b66-ba95-a4209c82febf">part 6</intref>, <intref check="valid" refid="ch.3-pt.6-div.2" target.guid="_be264b1d-6f62-475b-bbe4-fd0c943f899b">division 2</intref> (Later development plans).</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_55289e02-8078-4c71-b709-f2540d7d41aa" id="sec.376-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The matters that must be considered in deciding the application include each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f5f92718-f541-4a54-bddf-0c58f514d820" id="sec.376-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the CSG assessment criteria;</txt></block></li><li guid="_6d547b0c-677f-497f-9dad-4a5a171abfb9" id="sec.376-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether the applicant has taken all reasonable steps to comply with the relinquishment condition;</txt></block></li><li guid="_9769792e-57ba-4100-85b3-9c928456dd26" id="sec.376-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the effect of any approval of later development plans for the petroleum lease;</txt></block></li><li guid="_51c3d8da-24ca-4ef9-86a7-4d7e13e28963" id="sec.376-ssec.4-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">any submissions under <intref check="valid" refid="sec.374" target.guid="_3282a3a0-8b3e-4eaf-a771-e01e6f8940a9">section 374</intref> lodged within the period mentioned in <intref check="valid" refid="sec.374" target.guid="_3282a3a0-8b3e-4eaf-a771-e01e6f8940a9">section 374</intref><intref check="valid" refid="sec.374-ssec.2" target.guid="_91329251-bbb0-4288-8b01-8fd1bdfe54e7">(2)</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_46bd15b5-5f1a-49d4-8a78-9c760d5e0c4b" id="sec.376-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">After the application has been decided, the applicant and the coal or oil shale exploration tenement holder must be given notice of the decision.</txt></block></subclause></clause></subdivision></division><division affected.by.uncommenced="0" guid="_0f841b3e-2876-4de5-974c-235520225880" id="ch.3-pt.5-div.4"><no>Division 4</no><heading guid="_bb1cb5a0-e836-40a8-8c2f-61d12f3a32a7" id="ch.3-pt.5-div.4-he">Restriction on amendment of other conditions</heading><clause affected.by.uncommenced="0" guid="_406d23b0-5557-4a30-98ee-6efaecb6dec7" id="sec.377" provision.type="other" spent.amends="0"><no>377</no><heading guid="_8fe97e60-50b8-46da-a780-b37729ab452b" id="sec.377-he">Interests of relevant coal or oil shale mining tenement holder to be considered</heading><block><txt break.before="1">A condition of a petroleum lease must not be amended under <intref check="valid" refid="sec.848" target.guid="_854ad862-1041-4141-9139-09cae4f9c00a">section 848</intref> unless the interests of any relevant coal or oil shale mining tenement holder have been considered.</txt></block></clause></division><division affected.by.uncommenced="0" guid="_7081363c-61c3-45ca-9e5e-9585a35e940a" id="ch.3-pt.5-div.5"><no>Division 5</no><heading guid="_3f058346-5b34-41f3-8143-5d1778b1bc93" id="ch.3-pt.5-div.5-he">Renewals</heading><clause affected.by.uncommenced="0" guid="_16e090f9-fb42-4190-ad3b-ac7996cb0976" id="sec.378" provision.type="other" spent.amends="0"><no>378</no><heading guid="_776c1f2c-99ff-4e46-ad7b-a65f9573ee7e" id="sec.378-he">Applied provisions for making and deciding renewal application</heading><subclause affected.by.uncommenced="0" guid="_60d58b0f-783d-4f16-b4ea-1324f52fe4a3" id="sec.378-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The adopted provisions apply for a renewal application for a petroleum lease—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3c2a57ac-b5cf-43c6-aaf1-ff28e1e72897" id="sec.378-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">as if the petroleum lease holder had lodged a proposed later development plan for the Minister to approve; and</txt></block></li><li guid="_31cb0afa-315d-4528-be11-b213e15baa16" id="sec.378-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">as if a reference in the adopted provisions—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1dab3439-0fa9-4328-9eb6-549850628a3b" id="sec.378-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">to the application were a reference to the renewal application; and</txt></block></li><li guid="_499f9344-7eff-4540-8114-9dc518f8a1a4" id="sec.378-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">to a petroleum lease were a reference to the renewed petroleum lease; and</txt></block></li><li guid="_1cf6ab2f-2c2f-4267-afea-307f824a4e31" id="sec.378-ssec.1-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">to a proposed initial development plan, an initial development plan, a proposed development plan or a development plan were a reference to a proposed later development plan or a later development plan; and</txt></block></li><li guid="_855cce22-1896-49ba-8f2a-54d8b92c1253" id="sec.378-ssec.1-para1.b-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">in <intref check="valid" refid="sec.314" target.guid="_59e51d7e-3865-4a05-9438-464af9977aa7">section 314</intref><intref check="valid" refid="sec.314-ssec.5" target.guid="_e0f50c7f-478e-4d18-b446-568d6d352242">(5)</intref>, to the ATP-related application were a reference to the conditions of the renewed lease.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f2f7afc2-c8d4-4e1d-9870-1df0af548451" id="sec.378-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_f828df58-dd1f-410c-a8b0-2a625346c94d" id="sec.378-ssec.2-def.adoptedprovisions_"><txt break.before="1"><defterm guid="_bdf764fa-98d8-4c1f-917c-660c89073e1c" id="sec.378-ssec.2-def.adoptedprovisions" type="definition">adopted provisions</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bcb75d6b-f0e7-4bc3-af08-4b2b1119f69f" id="sec.378-ssec.2-def.adoptedprovisions-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if all or part of the land in the area of the petroleum lease is in the area of a coal or oil shale exploration tenement—<intref check="valid" refid="ch.3-pt.2" target.guid="_60586bec-2198-4a1a-9860-a488c272707c">part 2</intref>, <intref check="valid" refid="ch.3-pt.2-div.1" target.guid="_0b0b11a3-c85f-4117-b2ee-a82a37bb5d16">division 1</intref>, <intref check="valid" refid="ch.3-pt.2-div.1-sdiv.2" target.guid="_5d14b573-eaf9-4ab9-bf28-0ea46ffb3333">subdivisions 2</intref> and <intref check="valid" refid="ch.3-pt.2-div.1-sdiv.4" target.guid="_17ac5198-fde3-47e1-ac5e-c4718ede2a77">4</intref>; or</txt></block></li><li guid="_3f8189f7-ee40-4792-ad2a-14a8c732486d" id="sec.378-ssec.2-def.adoptedprovisions-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if all or part of the land in the area of the petroleum lease is in the area of a coal or oil shale mining lease and the coal or oil shale mining lease holder is not a holder of the petroleum lease—<intref check="valid" refid="ch.3-pt.3" target.guid="_e9bc49f9-3a04-49d3-b854-498473bad865">part 3</intref>, <intref check="valid" refid="ch.3-pt.3-div.2" target.guid="_58d0f6cc-997c-4d07-bca4-042a06780001">division 2</intref> (other than <intref check="valid" refid="sec.346" target.guid="_206320de-fa2d-478d-8219-838b9004725a">section 346</intref>); or</txt></block></li><li guid="_160966bc-0f2a-4c76-95e3-8605f16b8694" id="sec.378-ssec.2-def.adoptedprovisions-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if all or part of the land in the area of the petroleum lease is in the area of a coal or oil shale mining lease and the coal or oil shale mining lease holder holds the petroleum lease—<intref check="valid" refid="ch.3-pt.3" target.guid="_e9bc49f9-3a04-49d3-b854-498473bad865">part 3</intref>, <intref check="valid" refid="ch.3-pt.3-div.3" target.guid="_21ca4657-89d9-4466-baea-a0479db6b7f2">division 3</intref> (other than <intref check="valid" refid="sec.354" target.guid="_70559164-c86a-44de-9262-3f27baff6655">section 354</intref>).</txt></block></li></list></definition></deflist></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_be7d4e46-fa1b-4d2c-80e5-0df4c0c9d952" id="ch.3-pt.5-div.6"><no>Division 6</no><heading guid="_f02ab29e-1e16-47d2-8c3e-ae12e57d1863" id="ch.3-pt.5-div.6-he">Restrictions on particular transfers</heading><clause affected.by.uncommenced="0" guid="_68888914-e90c-4ed1-a2cc-fde86442bde3" id="sec.379" provision.type="other" spent.amends="0"><no>379</no><heading guid="_8964dc6e-d3b5-4994-913a-3eaa3a18d005" id="sec.379-he">Requirement for coordination arrangement to transfer petroleum lease in tenure area of mining lease</heading><subclause affected.by.uncommenced="0" guid="_04729650-f1a0-429e-be07-42c69fc748fd" id="sec.379-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies, despite the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.2" target.doc.id="act-2014-047" target.guid="_1287bd8c-ecef-4981-8bfe-d4aeeae114f7" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">chapter 2</legref>, <legref check="valid" jurisd="QLD" refid="ch.2-pt.1" target.doc.id="act-2014-047" target.guid="_1af56e87-7e33-47fe-a943-5f3232b15255" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">part 1</legref>, if land is in the area of a petroleum lease and a coal or oil shale mining lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fa019932-c5ea-45bd-a5e2-4522bceddff2" id="sec.379-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A transfer of the petroleum lease must not be approved <del xml:space="preserve">for registration</del><ins xml:space="preserve">as a prescribed dealing</ins> under the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Common Provisions Act</name></legref>, section 19<ins xml:space="preserve">, or registered as a notifiable dealing under the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Common Provisions Act</name></legref>, section 19B,</ins> unless the proposed transferee and the mining lease holder are<del xml:space="preserve"> parties to a coordination arrangement about</del>—</txt><list number.type="manual" unnumbered.indent="0"><li change="delReplace" guid="_76852dfe-72a4-4471-b362-fdd182186f9e-del" id="sec.379-ssec.2-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">petroleum production under the petroleum lease; and</txt></block></li><li change="delReplace" guid="_671c87f6-8ccd-42c4-841d-85f8ae453603-del" id="sec.379-ssec.2-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">coal or oil shale mining and any incidental coal seam gas mining under the mining lease.</txt></block></li><li change="insReplace" guid="_e46efcb2-f177-4f0e-b1f0-4b2d1b281e08" id="sec.379-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the same entity; or</txt></block></li><li change="insReplace" guid="_4810fa99-4bc1-4765-84f0-7ae1961ce743" id="sec.379-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">parties to a coordination arrangement about—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0880f79b-154f-43a7-9835-6e193092a86f" id="sec.379-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">petroleum production under the petroleum lease; and</txt></block></li><li guid="_b99f1be2-aa21-457a-83e2-0eb05b33025d" id="sec.379-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">coal or oil shale mining and any incidental coal seam gas mining under the mining lease.</txt></block></li></list></block></li></list></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_125342c0-5c01-4b66-ba95-a4209c82febf" id="ch.3-pt.6"><no>Part 6</no><heading guid="_7ca4c84f-b92e-48b5-ac3c-002a9c9eb3a7" id="ch.3-pt.6-he">Additional provisions for development plans</heading><division affected.by.uncommenced="0" guid="_7f7f7f14-6407-41d1-8ee6-c9da46c15af4" id="ch.3-pt.6-div.1"><no>Division 1</no><heading guid="_ee60960b-7979-4f42-bb07-0c0396b8b093" id="ch.3-pt.6-div.1-he">Initial development plans</heading><subdivision affected.by.uncommenced="0" guid="_c8b74652-b641-4c01-8ef3-ae3e0a17bb1a" id="ch.3-pt.6-div.1-sdiv.1"><no>Subdivision 1</no><heading guid="_5989c100-7e20-4e4a-a39a-67640ade1f51" id="ch.3-pt.6-div.1-sdiv.1-he">Additional requirements for proposed initial development plan</heading><clause affected.by.uncommenced="0" guid="_4dfd5b43-cf52-430e-ab4f-afb786f18fa0" id="sec.380" provision.type="other" spent.amends="0"><no>380</no><heading guid="_d4ac2c83-c420-4f08-a256-6c4629567d86" id="sec.380-he">Operation of <intref check="valid" refid="ch.3-pt.6-div.1-sdiv.1" target.guid="_c8b74652-b641-4c01-8ef3-ae3e0a17bb1a">sdiv 1</intref></heading><block><txt break.before="1">This subdivision provides for additional requirements for a proposed initial development plan for a petroleum lease applied for under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref> or this chapter.</txt></block></clause><clause affected.by.uncommenced="0" guid="_22914cc8-8a8a-4766-8b3b-36be78bb3e0c" id="sec.381" provision.type="other" spent.amends="0"><no>381</no><heading guid="_0dcc1639-1877-4318-8f3e-6e3ba69e2a36" id="sec.381-he">Statement about interests of coal or oil shale mining tenement holder</heading><block><txt break.before="1">The proposed plan must include a statement of how the effects on, and the interests of, any relevant overlapping or adjacent coal or oil shale mining tenement holder have, or have not, been considered, having regard to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e11da47e-dbb9-4928-bc43-09efe63317da" id="sec.381-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the main purposes of this chapter; and</txt></block></li><li guid="_1189e174-ac0d-46e1-a5d0-8baa30a53962" id="sec.381-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the CSG assessment criteria.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_b4b369a0-d23a-4e82-bc70-d0077804f45a" id="sec.382" provision.type="other" spent.amends="0"><no>382</no><heading guid="_70fc9068-ebcf-414e-9a32-bbba271fc016" id="sec.382-he">Requirement to optimise petroleum production</heading><subclause affected.by.uncommenced="0" guid="_ffb6eca1-b87b-4515-8ef5-fd467f54a2f4" id="sec.382-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The activities provided for under the proposed plan must seek to optimise petroleum production in a safe and efficient way.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e341c223-0433-41b1-a8f1-5fa3ac5c5c51" id="sec.382-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the activities must not adversely affect the future safe and efficient mining of coal where it is commercially and technically feasible not to do so.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1878edba-9dbd-407d-a71b-0589812fe387" id="sec.383" provision.type="other" spent.amends="0"><no>383</no><heading guid="_a54f9df7-7b71-4f67-a3a7-c3168086131b" id="sec.383-he">Consistency with coal or oil shale mining lease development plan and relevant coordination arrangement</heading><block><txt break.before="1">If all or part of the area of the proposed petroleum lease is in the area of a coal or oil shale mining lease (the <defterm guid="_c9055f3d-0c16-4d38-a6f0-8ebbed98f8d5" id="def.relevantland" type="definition">relevant land</defterm>), the proposed plan must, to the extent it applies to the relevant land, be consistent with—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d0c457f7-8aa9-4f70-8d42-33d6b7edc166" id="sec.383-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the development plan for the mining lease; and</txt></block></li><li guid="_4b2579fd-7815-470b-80d1-c3fca7971769" id="sec.383-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any coordination arrangement relating to the relevant land.</txt></block></li></list></block></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_6e5af938-84b0-440d-bc8b-8f0264a66726" id="ch.3-pt.6-div.1-sdiv.2"><no>Subdivision 2</no><heading guid="_14aa1a9d-c806-42cb-87c3-b18f849b086e" id="ch.3-pt.6-div.1-sdiv.2-he">Other additional provisions</heading><clause affected.by.uncommenced="0" guid="_45c042ff-48ea-44e3-9238-b6f4597df445" id="sec.383A" provision.type="other" spent.amends="0"><no>383A</no><heading guid="_97d89b0f-6dd0-4706-b6f6-6acb98dd3027" id="sec.383A-he">Application of <intref check="valid" refid="ch.3-pt.6-div.1-sdiv.2" target.guid="_6e5af938-84b0-440d-bc8b-8f0264a66726">sdiv 2</intref></heading><block><txt break.before="1">This subdivision applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3a523513-18b4-4f02-b1f6-768983c130d1" id="sec.383A-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the Minister is considering whether to approve a proposed initial development plan for a proposed petroleum lease; and</txt></block></li><li guid="_6758a037-7f6e-44f2-a6da-ee90b6f8d69a" id="sec.383A-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the area of the proposed lease includes all or part of the area of a coal or oil shale mining tenement.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_88a4efb2-a566-481e-8d83-c96b71b3dd7c" id="sec.383B" provision.type="other" spent.amends="0"><no>383B</no><heading guid="_7078176e-51a8-445e-a5f3-d2e7db554747" id="sec.383B-he">Additional criteria for approval</heading><block><txt break.before="1">The matters that must be considered include the CSG assessment criteria.</txt></block></clause><clause affected.by.uncommenced="0" guid="_126db17e-6baf-4833-b878-c9caf01e706a" id="sec.383C" provision.type="other" spent.amends="0"><no>383C</no><heading guid="_5cb76f1a-ca7d-4acb-81da-99d0c2f675a1" id="sec.383C-he">Restriction on approval</heading><block><txt break.before="1">The proposed plan can not be approved unless the applicant for the proposed lease has complied with the obligations under <intref check="valid" refid="sec.310" target.guid="_5c7461ea-75bf-4ec5-9876-1d63143e9047">section 310</intref><intref check="valid" refid="sec.310-ssec.1" target.guid="_148aa051-4f01-485b-b155-36844ee2e479">(1)</intref><intref check="valid" refid="sec.310-ssec.1-para1.b" target.guid="_3c31ab2e-3ea4-4a52-af72-19dc0971f964">(b)</intref>.</txt></block></clause></subdivision></division><division affected.by.uncommenced="0" guid="_be264b1d-6f62-475b-bbe4-fd0c943f899b" id="ch.3-pt.6-div.2"><no>Division 2</no><heading guid="_ce18218c-3422-4182-96aa-88c09db2ba5f" id="ch.3-pt.6-div.2-he">Later development plans</heading><subdivision affected.by.uncommenced="0" guid="_3720e5ad-1ebb-4e6b-bace-b13b4f2e6773" id="ch.3-pt.6-div.2-sdiv.1"><no>Subdivision 1</no><heading guid="_83bac54e-c5e4-4c45-ad92-8daac6776672" id="ch.3-pt.6-div.2-sdiv.1-he">Additional requirements for proposed later development plans</heading><clause affected.by.uncommenced="0" guid="_94695232-4f68-4c50-914e-5112a311705f" id="sec.383D" provision.type="other" spent.amends="0"><no>383D</no><heading guid="_a801135e-1279-4e2e-ac24-91d037d21d4a" id="sec.383D-he">Additional requirements under <intref check="valid" refid="ch.3-pt.6-div.1" target.guid="_7f7f7f14-6407-41d1-8ee6-c9da46c15af4">div 1</intref>, <intref check="valid" refid="ch.3-pt.6-div.1-sdiv.1" target.guid="_c8b74652-b641-4c01-8ef3-ae3e0a17bb1a">sdiv 1</intref> apply</heading><block><txt break.before="1">A proposed later development plan for a petroleum lease must comply with the additional requirements under <intref check="valid" refid="sec.381" target.guid="_22914cc8-8a8a-4766-8b3b-36be78bb3e0c">sections 381</intref> to <intref check="valid" refid="sec.383" target.guid="_1878edba-9dbd-407d-a71b-0589812fe387">383</intref> for a proposed initial development plan for a petroleum lease.</txt></block></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_bcacfdf2-506e-4b58-9faf-099899750490" id="ch.3-pt.6-div.2-sdiv.2"><no>Subdivision 2</no><heading guid="_496d8c2c-69e4-4043-9e35-ce18d0eb8b0f" id="ch.3-pt.6-div.2-sdiv.2-he">Other additional provisions</heading><clause affected.by.uncommenced="0" guid="_184a50c9-c533-4f94-a860-3abaabbc1017" id="sec.384" provision.type="other" spent.amends="0"><no>384</no><heading guid="_b3922ee9-2ec2-4126-bdf7-02f719c2d816" id="sec.384-he">Additional criteria</heading><subclause affected.by.uncommenced="0" guid="_22eacfbf-fae6-4d2d-8994-fd9583cc31fd" id="sec.384-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_df657f30-582b-4aa7-a6c9-0f390d3a15a8" id="sec.384-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the Minister is considering whether to approve a proposed later development plan for a petroleum lease; and</txt></block></li><li guid="_4afe48b4-c246-4af8-9fae-b54b47009f31" id="sec.384-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the area of the petroleum lease includes all or part of the area of a coal mining tenement or oil shale mining tenement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_78e00481-2255-404b-9cab-c3d8c087933e" id="sec.384-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The matters that must be considered also include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1dfaf2b7-3479-4b90-89cd-47d54ddc9d33" id="sec.384-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the CSG assessment criteria; and</txt></block></li><li guid="_2fe4ecf1-f27b-4575-95e1-41ba7af606b0" id="sec.384-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the effect of any approval of the proposed plan on any relinquishment condition for the lease.</txt><note guid="_513e7ae7-a644-4053-9aa7-3068633a3abf" id="sec.384-ssec.2-para1.b-note" type="example"><heading guid="_d6986ffa-1edf-4705-9672-a58b8ff4f248" id="sec.384-ssec.2-para1.b-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.148" target.guid="_115b1a82-d8d2-4486-afff-5e835526ac37">section 148</intref> (Power to require relinquishment).</txt></block></note></block></li></list></block></subclause></clause></subdivision></division></part><part affected.by.uncommenced="0" guid="_d9bb79cc-0a2d-4fb8-9faf-27d17a51f0ee" id="ch.3-pt.7"><no>Part 7</no><heading guid="_b4dfcdfc-b35b-4733-8436-cd7f363f95a0" id="ch.3-pt.7-he">Additional provisions for safety management system</heading><clause affected.by.uncommenced="0" guid="_8f40dfe8-854f-4c6d-9e25-19bd6a8ba9e8" id="sec.385" provision.type="other" spent.amends="0"><no>385</no><heading guid="_68057e30-2e34-4774-87e8-60b5ef92b162" id="sec.385-he">Grant of petroleum lease does not affect obligation to make safety management system</heading><subclause affected.by.uncommenced="0" guid="_f5f2f0ac-f32c-4107-8c57-2d619b3f97ee" id="sec.385-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a CSG statement accompanies an application for a petroleum lease, as required under this chapter.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4fd86ddc-8dd2-4f3b-aebb-a050e0237dae" id="sec.385-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The deciding of the application or the grant of the lease—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_50a066fa-80cf-43aa-b942-b685f80119ed" id="sec.385-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">does not affect the obligation under <intref check="valid" refid="sec.674" target.guid="_52e15d93-fce0-4c51-847d-6082d601e7de">section 674</intref> to make a safety management system for any operating plant in the area of the lease; and</txt></block></li><li guid="_c1313571-f9d8-444c-954d-7a3f699cd290" id="sec.385-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is not, of itself, evidence that a safety management system, or purported safety management system, for an operating plant on the area of the petroleum lease complies with <intref check="valid" refid="sec.675" target.guid="_28bc8c66-267c-4d67-9a55-97f681bdb4b3">section 675</intref> or <intref check="valid" refid="sec.705C" target.guid="_0d8ca067-2468-476e-810e-9f48381c0f9b">705C</intref>.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_93b80f55-243d-4c5b-928c-2a9b210cdc93" id="sec.386" provision.type="other" spent.amends="0"><no>386</no><heading guid="_dd9fecbd-97d4-4999-9aa2-d93b740c5700" id="sec.386-he">Requirement for joint interaction management plan</heading><subclause affected.by.uncommenced="0" guid="_e5480fa4-a261-4b2a-b3f8-701f59461e3e" id="sec.386-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b33fe4de-959a-4c59-ae2f-091798000c61" id="sec.386-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a person (the <defterm guid="_6a875c87-5094-4e5c-9f52-959ac5fad508" id="sec.386-ssec.1-def.operator" type="definition">operator</defterm>) proposes to be an operator of operating plant in the area of a petroleum tenure; and</txt></block></li><li guid="_c1370d3d-27e3-4441-9506-01f2f0ffa38b" id="sec.386-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">activities carried out, or proposed to be carried out, at the plant may adversely affect the safe mining of coal in the area of a coal or oil shale mining tenement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e17ac723-5948-4edf-871e-8cf3d14d64cd" id="sec.386-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="ch.9" target.guid="_e115e3d8-9707-4c5d-b3e6-be71f8d522ee">Chapter 9</intref>, <intref check="valid" refid="ch.9-pt.4" target.guid="_feccc805-854d-490d-9644-dd7ef21961d9">part 4</intref>, <intref check="valid" refid="ch.9-pt.4-div.5" target.guid="_3ccd9143-f883-4790-8d0d-2f2006c5ce9b">division 5</intref>, <intref check="valid" refid="ch.9-pt.4-div.5-sdiv.1" target.guid="_871b13c6-0132-4ee8-8f83-05a6329f2dbf">subdivision 1</intref> applies to the operator as if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6d3e27be-fec0-41d0-b7f6-0f9e50679985" id="sec.386-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a reference in the provisions to the operator of an authorised activities operating plant were a reference to the operator mentioned in <intref check="valid" refid="sec.386-ssec.1" target.guid="_e5480fa4-a261-4b2a-b3f8-701f59461e3e">subsection (1)</intref><intref check="valid" refid="sec.386-ssec.1-para1.a" target.guid="_b33fe4de-959a-4c59-ae2f-091798000c61">(a)</intref>; and</txt></block></li><li guid="_64496886-9c09-49cb-9c7f-485f56379f38" id="sec.386-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a reference in the provisions to the overlapping area were a reference to the area of the coal or oil shale mining tenement mentioned in <intref check="valid" refid="sec.386-ssec.1" target.guid="_e5480fa4-a261-4b2a-b3f8-701f59461e3e">subsection (1)</intref><intref check="valid" refid="sec.386-ssec.1-para1.b" target.guid="_c1370d3d-27e3-4441-9506-01f2f0ffa38b">(b)</intref>; and</txt></block></li><li guid="_02ff83a9-3788-4d26-9244-ce7eb7b28c4f" id="sec.386-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a reference in the provisions to the site senior executive were a reference to the site senior executive for the coal or oil shale mining tenement mentioned in <intref check="valid" refid="sec.386-ssec.1" target.guid="_e5480fa4-a261-4b2a-b3f8-701f59461e3e">subsection (1)</intref><intref check="valid" refid="sec.386-ssec.1-para1.b" target.guid="_c1370d3d-27e3-4441-9506-01f2f0ffa38b">(b)</intref>.</txt></block></li></list></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_7848573e-9ea5-49cb-a174-595b65c98b82" id="ch.3-pt.8"><no>Part 8</no><heading guid="_247897f4-25ee-402e-badd-8474bc5f1871" id="ch.3-pt.8-he">Confidentiality of information</heading><clause affected.by.uncommenced="0" guid="_d7d3f8fb-d730-449f-8a76-12a035de0bb0" id="sec.390" provision.type="other" spent.amends="0"><no>390</no><heading guid="_1c9ea604-775e-43a2-bd48-2745e6d53c0b" id="sec.390-he">Application of <intref check="valid" refid="ch.3-pt.8" target.guid="_7848573e-9ea5-49cb-a174-595b65c98b82">pt 8</intref></heading><subclause affected.by.uncommenced="0" guid="_dd085322-6e94-4a62-87e4-1efb92c26d93" id="sec.390-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This part applies if a tenure holder or a person who has applied for a tenure (the <defterm guid="_7d2efc70-5942-4c12-be1f-367e1bee7e84" id="sec.390-def.informationgiver" type="definition">information-giver</defterm>) gives another tenure holder or a person who has applied for a tenure (the <defterm guid="_cedb310a-b1ca-4e9a-8f91-7c9b73eaee17" id="sec.390-def.recipient" type="definition">recipient</defterm>) information—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_eec7ba2d-6211-4c18-a29e-87676dd03a85" id="sec.390-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that this chapter requires the information-giver to give the recipient, including, for example, information given to comply with <intref check="valid" refid="sec.313" target.guid="_d0f7f8a9-32db-446f-a486-3314ab6e2483">section 313</intref><intref check="valid" refid="sec.313-para1.a" target.guid="_9041b8ec-3a96-40ca-8b3d-166f4c7f5ba1">(a)</intref>; or</txt></block></li><li guid="_9582a0d0-5547-4221-b058-2d0b7a40a4ab" id="sec.390-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for the purposes of this chapter.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_08cb9f4c-6bb8-4729-98fa-1f7e4320c83b" id="sec.390-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, this part applies subject to any agreement between the information-giver and the recipient about the information or its use.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5f9a5d68-9c5d-4e0c-8171-dea5282a8eec" id="sec.390-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_37eef401-3393-427f-afa0-f36366cab4f8" id="sec.390-ssec.3-def.information_"><txt break.before="1"><defterm guid="_7816a544-0ffc-4663-9109-d62ced3df96f" id="sec.390-ssec.3-def.information" type="definition">information</defterm> means information given verbally or in writing.</txt></definition><definition affected.by.uncommenced="0" guid="_41c76d56-21c5-4675-8529-a2e7d7b9d606" id="sec.390-ssec.3-def.tenure_"><txt break.before="1"><defterm guid="_b1ed9b9d-cd8c-4032-b7b7-07a8110ebd83" id="sec.390-ssec.3-def.tenure" type="definition">tenure</defterm> means a petroleum tenure or a coal or oil shale mining tenement.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c851ce95-8273-4cb7-91c1-b1323caefb31" id="sec.391" provision.type="other" spent.amends="0"><no>391</no><heading guid="_8615752d-5f2b-44d3-bc81-dd983f993b84" id="sec.391-he">Confidentiality obligations</heading><subclause affected.by.uncommenced="0" guid="_3af58841-9186-41d1-b2f3-9ef4b7b11014" id="sec.391-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The recipient must not disclose the information to anyone else, unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6b9fcd56-35c5-4526-85f8-03564d6c16bc" id="sec.391-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the information is publicly available; or</txt></block></li><li guid="_59b1cd50-8478-4228-8770-810fcafa8a72" id="sec.391-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the disclosure is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0c617fec-ad2d-4daf-90d9-870ae5043afa" id="sec.391-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">to someone whom the recipient has authorised to carry out the authorised activities for the recipient’s petroleum tenure or coal or oil shale mining tenement; or</txt></block></li><li guid="_70e600cb-e5a4-4061-babf-0172712c94ac" id="sec.391-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">made with the information-giver’s consent; or</txt></block></li><li guid="_31457f7d-f912-47b5-960a-0c1bdd71d070" id="sec.391-ssec.1-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">expressly permitted or required under this or another Act; or</txt></block></li><li guid="_3207189e-f203-4a50-a7fa-c12630b1195a" id="sec.391-ssec.1-para1.b-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">to the Minister.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f3bca158-853a-4fe5-b293-5edf4f0eb3f4" id="sec.391-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The recipient may use the information only for the purpose for which it is given.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a8a06292-8596-4e6b-8be3-59b62aedd0c3" id="sec.392" provision.type="other" spent.amends="0"><no>392</no><heading guid="_8b0b69b8-4bc6-48f3-916d-b030a06942e4" id="sec.392-he">Civil remedies</heading><block><txt break.before="1">If the recipient does not comply with <intref check="valid" refid="sec.391" target.guid="_c851ce95-8273-4cb7-91c1-b1323caefb31">section 391</intref>, a court of competent jurisdiction may order the recipient to pay the information-giver all or any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8674f9e0-3583-40e4-93f0-88c1b47875d6" id="sec.392-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">compensation for any loss the information-giver incurred because of the failure to comply with the section;</txt></block></li><li guid="_618649e2-4b40-4c8f-a6cb-0766fc3dbdc0" id="sec.392-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the amount of any commercial gain the recipient made because of the failure to comply with the section.</txt></block></li></list></block></clause></part></chapter><chapter affected.by.uncommenced="0" guid="_4864cab3-5ae5-49c9-aeb6-cdfaa85590af" id="ch.3A"><no>Chapter 3A</no><heading guid="_e96a0757-6ce9-4aa4-8253-01ff6277d08d" id="ch.3A-he">Provisions for geothermal tenures and GHG authorities</heading><part affected.by.uncommenced="0" guid="_7eca25f3-ff82-4b7a-8d00-be356f5228a1" id="ch.3A-pt.1"><no>Part 1</no><heading guid="_0d52d272-8964-4fc6-8788-9d42f546b360" id="ch.3A-pt.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_b3d37a5b-c60e-464b-b983-09d9afc7da5f" id="sec.392AA" provision.type="other" spent.amends="0"><no>392AA </no><heading guid="_b15077d3-52b8-4b74-bc78-2186cb3d1cc0" id="sec.392AA-he">Relationship with chs 2 and 3</heading><subclause affected.by.uncommenced="0" guid="_bfa80b20-32fe-45f9-bfe5-04a8dcdd2239" id="sec.392AA-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Requirements and restrictions under this chapter relating to the granting of a petroleum tenure apply as well as any relevant requirements under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref> or <intref check="valid" refid="ch.3" target.guid="_7d989cb7-da2a-4737-842c-bd1944dbb54e">3</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_99dbe8b4-e0bf-4605-b599-f9ad17fc9502" id="sec.392AA-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If this chapter imposes a requirement for or a restriction on the granting of a petroleum tenure, it can not be granted if the restriction applies or if the requirement has not been complied with.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_905813e1-0b8f-436c-8725-a15f3862fd2a" id="sec.392AA-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If a provision of this chapter conflicts with a provision of <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref> the provision of this chapter prevails to the extent of the inconsistency.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_89f19ae4-9d08-4097-ace8-2420058b50a1" id="sec.392AA-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">This chapter does not otherwise limit or affect the requirements of <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a68aebdb-bd78-4c0e-9a6b-620bb54cbc8a" id="sec.392AA-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0"><intref check="valid" refid="sec.392AA-ssec.6" target.guid="_8e039a50-029f-4943-ab2d-6a580ed3e541">Subsection (6)</intref> applies if this chapter imposes a requirement for or a restriction on the carrying out of an authorised activity for a petroleum tenure.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8e039a50-029f-4943-ab2d-6a580ed3e541" id="sec.392AA-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">Despite <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, the activity is not an authorised activity for the petroleum tenure while the restriction applies or if the requirement has not been complied with.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_970cd784-7188-4ba9-8593-2ec3fc73eacb" id="sec.392AB" provision.type="other" spent.amends="0"><no>392AB </no><heading guid="_dacd5d78-cd5e-4909-a74b-e3322e03248b" id="sec.392AB-he">What is an <defterm guid="_554e5a0e-a0b0-467e-a6cc-fd8089a6fbc1" type="mention">overlapping authority (geothermal or GHG)</defterm></heading><subclause affected.by.uncommenced="0" guid="_586ee111-40ff-4921-b2ae-5d0e246af92e" id="sec.392AB-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An <defterm guid="_13a24429-986d-4a84-b547-d479022265d4" id="sec.392AB-def.overlappingauthoritygeothermalorGHG-oc.2" type="definition">overlapping authority (geothermal or GHG)</defterm>, for a petroleum authority, is any geothermal tenure or GHG authority all or part of the area of which is in the petroleum authority’s area.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bcbdf98b-ad5d-4575-97b3-229e4bebb029" id="sec.392AB-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An <defterm guid="_db6aae77-c8e6-48a2-be76-677893aca622" id="sec.392AB-def.overlappingauthoritygeothermalorGHG-oc.3" type="definition">overlapping authority (geothermal or GHG)</defterm>, for a proposed petroleum authority, is a geothermal tenure or GHG authority (the <defterm guid="_53e5a8f0-aab5-49cf-b74f-ce2fa454057b" id="sec.392AB-def.existingauthority" type="definition">existing authority</defterm>) all or part of the area of which will, if the proposed petroleum authority is granted, be in the existing authority’s area.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1c94b51b-c3e5-4ff9-9827-3b1618341f7a" id="sec.392AC" provision.type="other" spent.amends="0"><no>392AC </no><heading guid="_c9c0565c-cf08-4f32-9ee4-ff568e765a84" id="sec.392AC-he">General provision about petroleum authorities for land subject to geothermal tenure or GHG authority</heading><block><txt break.before="1">Subject to the other provisions of this chapter and chapters 2 and 3, the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref>, <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref>, a geothermal tenure or a GHG authority does not limit or otherwise affect—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4530ed79-cb7d-446a-85df-2eb0c0b9ee75" id="sec.392AC-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the power under this Act to grant a petroleum authority; or</txt></block></li><li guid="_ef1beca5-96d5-4089-99d2-393e05080e87" id="sec.392AC-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the carrying out of authorised activities for a petroleum authority.</txt></block></li></list></block></clause></part><part affected.by.uncommenced="0" guid="_01e4b82f-1ea4-4421-943f-62e694596a35" id="ch.3A-pt.2"><no>Part 2</no><heading guid="_73863d6d-b028-49ea-af4e-d3f72ebdb132" id="ch.3A-pt.2-he">Obtaining petroleum lease if overlapping tenure</heading><division affected.by.uncommenced="0" guid="_00069686-7f60-4637-b5e5-1e14a467a5bc" id="ch.3A-pt.2-div.1"><no>Division 1</no><heading guid="_0a407996-f1d6-4548-8aca-78aada5a215c" id="ch.3A-pt.2-div.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_c36ad7f2-8f74-4517-9563-6a7dba62164c" id="sec.392AD" provision.type="other" spent.amends="0"><no>392AD </no><heading guid="_e61076ee-056b-43f1-9468-e16b0853d074" id="sec.392AD-he">Application of <intref check="valid" refid="ch.3A-pt.2" target.guid="_01e4b82f-1ea4-4421-943f-62e694596a35">pt 2</intref></heading><block><txt break.before="1">This part applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_59f374c3-2b32-421e-a00b-d16427d971d3" id="sec.392AD-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a person (the <defterm guid="_705fd40b-ce87-4b22-9c36-3789197d62a5" id="sec.392AD-def.applicant" type="definition">applicant</defterm>) wishes to make a petroleum lease application; and</txt></block></li><li guid="_ad9662ef-735a-4fd5-9713-ad385960f3ae" id="sec.392AD-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">there is an overlapping authority (geothermal or GHG) for the proposed petroleum lease; and</txt></block></li><li guid="_d27eb2f5-da68-4b79-bf4a-25bc8b5a1fd7" id="sec.392AD-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the overlapping authority (geothermal or GHG) is a geothermal tenure or GHG tenure (the <defterm guid="_aeebd180-83cc-4081-b892-8bcedfd3ed31" id="sec.392AD-def.overlappingtenure" type="definition">overlapping tenure</defterm>).</txt></block></li></list></block></clause></division><division affected.by.uncommenced="0" guid="_ee31a470-1b4e-4cad-980e-06510ad508ee" id="ch.3A-pt.2-div.2"><no>Division 2</no><heading guid="_9cfae226-0fa7-489a-9f37-030a8cc5a689" id="ch.3A-pt.2-div.2-he">Requirements for application</heading><clause affected.by.uncommenced="0" guid="_49bc0e85-6104-48a4-84fe-8d17673d33fd" id="sec.392AE" provision.type="other" spent.amends="0"><no>392AE </no><heading guid="_9e31ff67-f3f9-4216-a2e2-9bfe40e0dce4" id="sec.392AE-he">Requirements for making application</heading><subclause affected.by.uncommenced="0" guid="_3a8de305-475d-472f-913d-3830d29c024d" id="sec.392AE-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The petroleum lease application must include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a8224bec-2f88-495d-bd94-aea13fb53e2a" id="sec.392AE-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a statement complying with <intref check="valid" refid="sec.392AF" target.guid="_37a71bc7-8955-44f3-9128-6cfd8d1c1647">section 392AF</intref> (an <defterm guid="_bb567a24-d667-4ce2-8a98-c576252790b8" id="sec.392AE-ssec.1-def.informationstatement" type="definition">information statement</defterm>); and</txt></block></li><li guid="_2aa1324f-fbc3-47be-9347-36a18a5d54ed" id="sec.392AE-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">other information addressing the matters mentioned in <intref check="valid" refid="sec.392AE-ssec.2" target.guid="_81c0d7cf-f240-475f-b103-329d55e8f2b8">subsection (2)</intref> (the <defterm guid="_ec71b53e-5594-4766-a270-9c83912aa9cf" id="sec.392AE-ssec.1-def.assessmentcriteria" type="definition">assessment criteria</defterm>), other than about attempts to consult with the overlapping tenure holder.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_81c0d7cf-f240-475f-b103-329d55e8f2b8" id="sec.392AE-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The assessment criteria are—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_955fb99c-bc55-4da2-a9d3-078d758dc1f0" id="sec.392AE-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">compliance with the provisions of <intref check="valid" refid="ch.9" target.guid="_e115e3d8-9707-4c5d-b3e6-be71f8d522ee">chapter 9</intref>; and</txt></block></li><li guid="_d73f0fc9-66f8-483f-9398-2cf64d7f27b8" id="sec.392AE-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the additional requirements under <intref check="valid" refid="ch.3A-pt.6" target.guid="_ed76cd77-f590-4d50-a8ac-fa82b545759b">part 6</intref> for proposed initial development plans; and</txt></block></li><li guid="_010b7191-5f90-4a92-b67d-89410525c99b" id="sec.392AE-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the potential for the parties to make the following for the proposed petroleum lease—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5b612199-5ef6-4a14-8e75-5798d7bdc28f" id="sec.392AE-ssec.2-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">for a geothermal tenure—a geothermal coordination arrangement;</txt></block></li><li guid="_17a80e0b-d95a-4b18-8924-4441269b6f49" id="sec.392AE-ssec.2-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">for a GHG tenure—a GHG coordination arrangement; and</txt></block></li></list></block></li><li guid="_707900ac-7202-4043-9d89-3238d9951b07" id="sec.392AE-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the economic and technical viability of the concurrent or coordinated carrying out of authorised activities for the proposed petroleum lease and the overlapping tenure; and</txt></block></li><li guid="_d1d2aab0-76af-44c2-bede-bb742d12b2a1" id="sec.392AE-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the public interest.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_37a71bc7-8955-44f3-9128-6cfd8d1c1647" id="sec.392AF" provision.type="other" spent.amends="0"><no>392AF </no><heading guid="_09889fbd-171f-4dbb-ba35-88c132e12263" id="sec.392AF-he">Content requirements for information statement</heading><block><txt break.before="1">The information statement must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2b9a9561-3bbd-43d8-b018-7d7477fd79d2" id="sec.392AF-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">assess—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_37ab1b7f-8440-46ba-bdf0-3064630681f7" id="sec.392AF-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the likely effect of proposed authorised activities for the proposed petroleum lease on the future carrying out of authorised activities for the overlapping tenure; and</txt></block></li><li guid="_c0c9519f-14da-4ab9-ba1d-a87d2c706e46" id="sec.392AF-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the technical and commercial feasibility of coordinating the proposed authorised activities and the future carrying out of the authorised activities; and</txt></block></li></list></block></li><li guid="_e89c23ee-f77d-4ecc-8e4b-418af0de598f" id="sec.392AF-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">include proposals for the minimisation of potential adverse effects on possible future carrying out of authorised activities for the overlapping tenure.</txt></block></li></list></block></clause></division><division affected.by.uncommenced="0" guid="_8822adac-c649-43d3-98ce-a1ea1fa7f0fc" id="ch.3A-pt.2-div.3"><no>Division 3</no><heading guid="_3128ca62-9c32-4515-9cd8-72271b44eebe" id="ch.3A-pt.2-div.3-he">Consultation provisions</heading><clause affected.by.uncommenced="0" guid="_7709ad6a-4909-442f-96f8-6772fe783dd1" id="sec.392AG" provision.type="other" spent.amends="0"><no>392AG </no><heading guid="_6bebb029-cbc1-4e86-ba79-5f81ad7b3ea1" id="sec.392AG-he">Applicant’s information obligation</heading><subclause affected.by.uncommenced="0" guid="_ad81712b-08a6-42fc-aae4-b6056e6c94da" id="sec.392AG-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The applicant must within 10 business days after making the petroleum lease application give the overlapping tenure holder a copy of the application other than any part of the application relating to the capability criteria.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_96161b19-cc65-463f-bb21-43bcb65197d5" id="sec.392AG-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the Minister is reasonably satisfied the applicant has not complied with an obligation under this division, the petroleum lease application may be refused.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_93b1d0d9-3f3e-4060-b936-3143f1c1a586" id="sec.392AH" provision.type="other" spent.amends="0"><no>392AH </no><heading guid="_18380bce-f994-4451-94f9-022c61e870fe" id="sec.392AH-he">Submissions by overlapping tenure holder</heading><subclause affected.by.uncommenced="0" guid="_33dee704-d358-4854-8dd7-e869f2ef7b5e" id="sec.392AH-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The overlapping tenure holder may lodge submissions about the petroleum lease application (<defterm guid="_a662a95f-2e8f-4260-94aa-3505f4d0a337" id="sec.392AH-def.holdersubmissions" type="definition">holder submissions</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f734af14-23b8-4149-b9a7-cf401fb5ddd3" id="sec.392AH-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, holder submissions may be lodged only within 4 months after the holder is given a copy of the application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4c28d939-b5b2-4155-92bb-572d7bc5180c" id="sec.392AH-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Holder submissions may do all or any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_16fda4c3-57e1-4e27-91a5-9835dd4d2b05" id="sec.392AH-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">state that the holder does not object to the granting of the proposed petroleum lease;</txt></block></li><li guid="_129bd902-9e87-470d-87ba-8a71f928b9fe" id="sec.392AH-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the overlapping tenure is a geothermal permit or GHG permit—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a95f8688-ef7c-4c45-b83b-e2e20791675f" id="sec.392AH-ssec.3-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">state that the holder does not wish any priority for the carrying out of authorised activities for any future lease that may arise from the permit (<defterm guid="_b19facc8-db0d-4035-a7c6-0d2e8bd3cf03" id="sec.392AH-ssec.3-para1.b-def.overlappingauthoritypriority" type="definition">overlapping authority priority</defterm>); or</txt></block></li><li guid="_ec908c61-d9c0-47a0-a022-f707900fa797" id="sec.392AH-ssec.3-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">include a proposal by the overlapping tenure holder for the activity for which overlapping authority priority is sought;</txt></block></li></list></block></li><li guid="_8ac00d6d-60cf-4252-8c2a-cff2f434e5d3" id="sec.392AH-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">include information about authorised activities carried out under the overlapping tenure;</txt></block></li><li guid="_36aa8042-2acb-4d88-a4b6-600d6a503df6" id="sec.392AH-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">include information relevant to the assessment criteria;</txt></block></li><li guid="_7a5d7c9c-328e-44f5-be6c-8d5457bf0a81" id="sec.392AH-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">propose reasonable provisions for the safety management system for the proposed petroleum lease.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_fac85ddb-a5f8-42c1-9e48-980fdb4854ba" id="sec.392AH-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The holder must give the applicant a copy of the holder submissions.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_ad62defd-e418-4251-8b16-0cc2fa17bdff" id="ch.3A-pt.2-div.4"><no>Division 4</no><heading guid="_ac9549eb-b032-44b1-bb6e-b3f22dbe5f20" id="ch.3A-pt.2-div.4-he">Resource management decision if overlapping permit</heading><clause affected.by.uncommenced="0" guid="_2f460ba6-9e2d-4589-9753-b5e5aeec5870" id="sec.392AI" provision.type="other" spent.amends="0"><no>392AI </no><heading guid="_ec702324-b087-4da6-ac54-ebef172aa3b5" id="sec.392AI-he">Application of <intref check="valid" refid="ch.3A-pt.2-div.4" target.guid="_ad62defd-e418-4251-8b16-0cc2fa17bdff">div 4</intref></heading><subclause affected.by.uncommenced="0" guid="_e236f5d7-3d37-4114-832b-26d7bc626ef0" id="sec.392AI-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This division applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_481248ca-a53c-48aa-a68b-a7b326587587" id="sec.392AI-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the overlapping tenure is a geothermal permit or GHG permit (the <defterm guid="_8c32d89a-8a32-41fe-bd9b-1c196e453204" id="sec.392AI-ssec.1-def.overlappingpermit" type="definition">overlapping permit</defterm>); and</txt></block></li><li guid="_c51edbb7-fe55-4afa-85b0-f8466d0ac26b" id="sec.392AI-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the overlapping permit holder has lodged holder submissions within 4 months after the holder was given a copy of the application; and</txt></block></li><li guid="_9c0df12f-c0e3-4681-81ef-cf38ef8ff674" id="sec.392AI-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the submissions state that the holder wishes overlapping authority priority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0d1eb63b-cdda-4f08-956c-b7eedc3044ee" id="sec.392AI-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, this division does not apply if, under the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.5" target.doc.id="act-2010-031" target.guid="_18ab3134-f9ef-4b7d-a156-de3b91cceaa3" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act">chapter 5</legref> or the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.4" target.doc.id="act-2009-003" target.guid="_faefc638-342e-43b0-a5ed-6ae7a9f9a690" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act">chapter 4</legref>, overlapping authority priority has been given for any of the relevant land.</txt><note guid="_bb679213-5d52-4833-b582-e3b18a80f451" id="sec.392AI-ssec.2-note" type="example"><heading guid="_e96fd335-dd7e-4d98-9faf-1e3678c240c6" id="sec.392AI-ssec.2-note-he">Note—</heading><block><txt break.before="1">If this division does not apply, the petroleum lease application proceeds immediately to decision under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref> as affected by <intref check="valid" refid="ch.3A-pt.2-div.7" target.guid="_2de34aea-09c6-46c7-b46b-0f052d67bb56">division 7</intref>.</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_9ee59ac0-3324-48b7-af27-470ccbd354f2" id="sec.392AJ" provision.type="other" spent.amends="0"><no>392AJ </no><heading guid="_08595a92-37bc-400a-9846-8f9f50a34e8c" id="sec.392AJ-he">Resource management decision</heading><block><txt break.before="1">The Minister must make a decision (the <defterm guid="_d1021ca1-d007-43d5-b3e8-4cecebfbf0e0" id="def.resourcemanagementdecision" type="definition">resource management decision</defterm>) about whether to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_071ece76-45ed-4b50-9e81-86b2deb5cd97" id="sec.392AJ-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">grant the petroleum lease application; or</txt></block></li><li guid="_0386fc03-9203-4c9e-93e8-eec9c42d6660" id="sec.392AJ-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give any overlapping authority priority for all or part of the relevant land; or</txt></block></li><li guid="_e09a7883-7cbc-4dc9-82eb-b377af727ae0" id="sec.392AJ-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">not to grant the petroleum lease application and not to give any overlapping authority priority for any of the relevant land.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_708fc819-6730-4a75-ac9d-159e406a7f8c" id="sec.392AK" provision.type="other" spent.amends="0"><no>392AK </no><heading guid="_08fb0927-9568-42f2-ba79-dfb22330cc7d" id="sec.392AK-he">Criteria for decision</heading><block><txt break.before="1">The Minister must consider the following in making the resource management decision—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3c74df9c-58e9-4aaf-b437-570bb2765282" id="sec.392AK-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the information statement;</txt></block></li><li guid="_b309eb4a-51f1-4378-9992-7a91417134c0" id="sec.392AK-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the assessment criteria;</txt></block></li><li guid="_40e9d204-530e-4ddd-bd73-f63917106f47" id="sec.392AK-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the holder submissions;</txt></block></li><li guid="_03adf7ad-34bc-4911-bdad-679aa4ef414f" id="sec.392AK-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the public interest.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_b1a913ef-e9ea-4e39-bc79-c06c29f7addd" id="sec.392AL" provision.type="other" spent.amends="0"><no>392AL </no><heading guid="_49493b1e-a15d-435b-a0b5-8d623d2e97e2" id="sec.392AL-he">Restrictions on giving overlapping authority priority</heading><block><txt break.before="1">Overlapping authority priority may be recommended or given only if it is considered—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_255535c5-77a3-43a1-acec-4c95153abce7" id="sec.392AL-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">either—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8ecfddd8-4b60-47dc-a851-28793dd92696" id="sec.392AL-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">it is unlikely the applicant and the overlapping permit holder will enter into—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_65cb23d4-be49-47ef-99c1-7d40679ea71d" id="sec.392AL-para1.a-para2.i-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">for a geothermal permit—a geothermal coordination arrangement; or</txt></block></li><li guid="_f6866c96-539d-42da-8d71-406daf1600b4" id="sec.392AL-para1.a-para2.i-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">for a GHG permit—a GHG coordination arrangement; or</txt></block></li></list></block></li><li guid="_8be59667-ebd9-4620-919b-2757f24557d1" id="sec.392AL-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">an arrangement mentioned in <intref check="valid" refid="sec.392AL-para1.a-para2.i" target.guid="_8ecfddd8-4b60-47dc-a851-28793dd92696">subparagraph (i)</intref> for the proposed petroleum lease is not commercially or technically feasible; and</txt></block></li></list></block></li><li guid="_c4d561be-0d9c-4ed1-a6f7-655ab093493c" id="sec.392AL-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the public interest would be best served by not granting a petroleum lease to the applicant first.</txt></block></li></list></block></clause></division><division affected.by.uncommenced="0" guid="_b954343b-1792-4f81-b46b-7effc0c51d51" id="ch.3A-pt.2-div.5"><no>Division 5</no><heading guid="_0b884724-24aa-4bbf-9ccf-37203b7076d3" id="ch.3A-pt.2-div.5-he">Process if resource management decision is to give overlapping authority priority</heading><clause affected.by.uncommenced="0" guid="_79a13ebc-deca-4476-8c0c-c5a74c938178" id="sec.392AM" provision.type="other" spent.amends="0"><no>392AM </no><heading guid="_81804296-55d8-448c-9aa6-9f2e7b02acb9" id="sec.392AM-he">Application of <intref check="valid" refid="ch.3A-pt.2-div.5" target.guid="_b954343b-1792-4f81-b46b-7effc0c51d51">div 5</intref></heading><block><txt break.before="1">This division applies only if, under <intref check="valid" refid="ch.3A-pt.2-div.4" target.guid="_ad62defd-e418-4251-8b16-0cc2fa17bdff">division 4</intref>, a resource management decision is required and the decision is to give overlapping authority priority for all or part of the relevant land.</txt></block></clause><clause affected.by.uncommenced="0" guid="_f346a204-953b-4842-b64a-9c199a719f43" id="sec.392AN" provision.type="other" spent.amends="0"><no>392AN </no><heading guid="_361aa7c1-00d4-49dc-be84-38d53112b6f8" id="sec.392AN-he">Notice to applicant and overlapping permit holder</heading><subclause affected.by.uncommenced="0" guid="_90a930de-fbf8-4cb2-baa7-ef15fa02262e" id="sec.392AN-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must give the applicant and the overlapping permit holder notice of the resource management decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e4b7bfef-7053-436a-a0ec-60ce56481eff" id="sec.392AN-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must invite the overlapping permit holder to, within 6 months after the giving of the notice (the <defterm guid="_929c6221-2d90-4dc4-8f72-a232d5484320" id="sec.392AN-def.overlappingauthorityapplicationperiod" type="definition">overlapping authority application period</defterm>), apply for a lease as follows (an <defterm guid="_5499a9d1-ef2c-4332-856b-9bcc37c1db09" id="sec.392AN-def.overlappinglease" type="definition">overlapping lease</defterm>) for the land mentioned in <intref check="valid" refid="sec.392AN-ssec.3" target.guid="_16989db9-95a9-4160-a95c-06c4064de96b">subsection (3)</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b5a682de-ad80-4e6f-b427-1e01258e281a" id="sec.392AN-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the overlapping permit is a geothermal permit—a geothermal lease;</txt></block></li><li guid="_468f8b29-405c-442e-8001-1a50cb7fc477" id="sec.392AN-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the overlapping permit is a GHG permit—a GHG lease.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_16989db9-95a9-4160-a95c-06c4064de96b" id="sec.392AN-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For <intref check="valid" refid="sec.392AN-ssec.2" target.guid="_e4b7bfef-7053-436a-a0ec-60ce56481eff">subsection (2)</intref>, the land is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5742a307-16b3-4c48-ba9d-68e7cb247b19" id="sec.392AN-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the overlapping authority priority is for all of the land—for all of the land; or</txt></block></li><li guid="_404afd62-9772-4e88-b33d-3ae7a26fded7" id="sec.392AN-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the priority is for part of the land—for that part.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_64e6ce2e-860a-4eac-8c5b-899ec46da1db" id="sec.392AO" provision.type="other" spent.amends="0"><no>392AO </no><heading guid="_429a3e42-2051-45b9-8a3d-a61a3e7f7bc8" id="sec.392AO-he">Overlapping lease application for all of the land</heading><subclause affected.by.uncommenced="0" guid="_f24172ba-a9ed-46f1-9d0c-a87e2a17e0af" id="sec.392AO-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_168577b6-ee09-4a61-b697-541f0ca11809" id="sec.392AO-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the overlapping authority priority is for all of the land; and</txt></block></li><li guid="_dec189a4-276d-43ba-a6d9-4637f5f7d1eb" id="sec.392AO-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">within the overlapping authority application period the overlapping permit holder applies for an overlapping lease for all of the land.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3e921c27-8c33-4568-ba8d-66b508025ee6" id="sec.392AO-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A further step can not be taken to decide the petroleum lease application until after the overlapping lease application has been decided.</txt><note guid="_9b0e4a70-c4dc-4d28-ac0a-3ee4b6c587df" id="sec.392AO-ssec.2-note" type="example"><heading guid="_5fa8a5d0-0c4c-4e5a-8aee-56910f0b5477" id="sec.392AO-ssec.2-note-he">Note—</heading><block><txt break.before="1">The <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.5" target.doc.id="act-2010-031" target.guid="_18ab3134-f9ef-4b7d-a156-de3b91cceaa3" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act">chapter 5</legref>, <legref check="valid" jurisd="QLD" refid="ch.5-pt.5" target.doc.id="act-2010-031" target.guid="_49a64e15-3723-417f-9736-b5fed5654c25" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act">part 5</legref> and the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.4" target.doc.id="act-2009-003" target.guid="_faefc638-342e-43b0-a5ed-6ae7a9f9a690" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act">chapter 4</legref>, <legref check="valid" jurisd="QLD" refid="ch.4-pt.5" target.doc.id="act-2009-003" target.guid="_fda69d3e-fedb-4796-b31d-3071df3ec5f1" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act">part 5</legref> provide for refusal of the overlapping lease application if it is not pursued in a timely manner.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_38022508-375d-4629-a4c9-97986c07e675" id="sec.392AO-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the decision on the overlapping lease application is to grant an overlapping lease for all of the land, the petroleum lease application is taken to have lapsed.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_774ad14c-6fa4-45c5-b76e-5158fdbfbada" id="sec.392AP" provision.type="other" spent.amends="0"><no>392AP </no><heading guid="_ad3d837a-20a2-4ce8-ac8f-092d3622aa12" id="sec.392AP-he">Overlapping lease application for part of the land</heading><subclause affected.by.uncommenced="0" guid="_d3b3c1a1-eb51-4530-a7c2-550660f9ae14" id="sec.392AP-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the overlapping permit holder applies for an overlapping lease for part of the land within the overlapping authority application period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_38056939-a9e2-4336-8705-4c92747a1077" id="sec.392AP-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The person who made the petroleum lease application may amend it so that a petroleum lease is only sought for all or part of the rest of the land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_614a2172-9ce5-4a5b-a019-3e1f0921d688" id="sec.392AP-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Unless the amendment is made, a further step can not be taken to decide the petroleum lease application until after the overlapping lease application has been decided.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1af388d5-38f9-43f2-b486-ab5ddd94b138" id="sec.392AP-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1730c185-f00a-42c4-a387-c358d783df79" id="sec.392AP-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the amendment has not been made; and</txt></block></li><li guid="_df89cccd-152e-4f1d-b5b1-52f19c654df0" id="sec.392AP-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the decision on the overlapping lease application is to grant an overlapping lease for part of the land;</txt></block></li></list></block><block><txt break.before="1">the person who made the petroleum lease application may amend it so that a petroleum lease is only sought for all or part of the rest of the land.</txt><note guid="_f297b948-3938-42bc-8a20-69e383700e78" id="sec.392AP-ssec.4-note" type="example"><heading guid="_855ed52e-50be-449a-9d08-9363d7b57640" id="sec.392AP-ssec.4-note-he">Note—</heading><block><txt break.before="1">If the petroleum lease application is not amended, see <intref check="valid" refid="sec.392AT" target.guid="_8920098f-cfa5-4afc-b899-9d8e753d8f5a">section 392AT</intref> (Application may be refused if no reasonable prospects of future geothermal or GHG coordination arrangement).</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8fd82e1a-3966-43b0-b1bd-e30b63c9af4c" id="sec.392AQ" provision.type="other" spent.amends="0"><no>392AQ </no><heading guid="_2542e719-2f16-4d6d-b8bb-b3e71d575a85" id="sec.392AQ-he">No overlapping lease application</heading><block><txt break.before="1">If the overlapping permit holder does not apply for an overlapping lease for any of the land within the overlapping authority application period, the petroleum lease application may be decided.</txt></block></clause></division><division affected.by.uncommenced="0" guid="_43bde08b-46e4-4d25-9ab3-648c12a6cc0c" id="ch.3A-pt.2-div.6"><no>Division 6</no><heading guid="_887505fe-b831-4e0e-87ad-9b5595405388" id="ch.3A-pt.2-div.6-he">Resource management decision not to grant and not to give priority</heading><clause affected.by.uncommenced="0" guid="_afd95639-6344-4cc2-b948-98cd107b1d0d" id="sec.392AR" provision.type="other" spent.amends="0"><no>392AR </no><heading guid="_a189ccfd-fb6d-46f3-bf9d-e2f16a7d1429" id="sec.392AR-he">Lapsing of application</heading><block><txt break.before="1">The petroleum lease application is taken to have lapsed if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d4a8ea11-d9bc-401e-9fc3-5abfb711353c" id="sec.392AR-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">under <intref check="valid" refid="ch.3A-pt.2-div.4" target.guid="_ad62defd-e418-4251-8b16-0cc2fa17bdff">division 4</intref>, a resource management decision is required; and</txt></block></li><li guid="_1216c75e-18d5-4e44-b385-0c5dc9aa54f1" id="sec.392AR-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the decision was not to grant the petroleum lease application and not to give any overlapping authority priority for any of the relevant land.</txt></block></li></list></block></clause></division><division affected.by.uncommenced="0" guid="_2de34aea-09c6-46c7-b46b-0f052d67bb56" id="ch.3A-pt.2-div.7"><no>Division 7</no><heading guid="_df989741-29ec-43e7-b3b4-9cd8c9f5e693" id="ch.3A-pt.2-div.7-he">Deciding application</heading><clause affected.by.uncommenced="0" guid="_484d66e7-24e2-4ed8-ae2e-7e02e65f1f1b" id="sec.392AS" provision.type="other" spent.amends="0"><no>392AS </no><heading guid="_e6a30da4-9424-4f26-956a-b86fd72422b3" id="sec.392AS-he">Application of <intref check="valid" refid="ch.3A-pt.2-div.7" target.guid="_2de34aea-09c6-46c7-b46b-0f052d67bb56">div 7</intref></heading><block><txt break.before="1">This division applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5bd5fa04-6787-45a0-abd7-6ca24dee3c8c" id="sec.392AS-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the overlapping tenure holder has not lodged holder submissions within 4 months after the holder was given a copy of the application (the <defterm guid="_bc3ea3e6-3ba1-431f-8211-3f91546759fd" id="sec.392AS-def.submissionperiod" type="definition">submission period</defterm>) or at all; or</txt></block></li><li guid="_b587937c-d82d-4a71-a8e8-d4a8ff890925" id="sec.392AS-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the overlapping tenure holder has lodged holder submissions within the submission period stating that the holder does not wish any overlapping authority priority; or</txt></block></li><li guid="_30e857c4-0e6a-4f4d-885e-022186ed5868" id="sec.392AS-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">under <intref check="valid" refid="ch.3A-pt.2-div.4" target.guid="_ad62defd-e418-4251-8b16-0cc2fa17bdff">division 4</intref>, a resource management decision is required and—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1e0b1900-5def-4da4-95f6-26fe153681e4" id="sec.392AS-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the resource management decision is not to give overlapping authority priority for any of the relevant land; or</txt></block></li><li guid="_1cb5f33f-81a4-4a29-89bb-e792513188e6" id="sec.392AS-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the resource management decision is to give overlapping authority priority for all or part of the relevant land and after <intref check="valid" refid="ch.3A-pt.2-div.5" target.guid="_b954343b-1792-4f81-b46b-7effc0c51d51">division 5</intref> has been complied with the Minister decides to grant a petroleum lease for the land.</txt></block></li></list></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_8920098f-cfa5-4afc-b899-9d8e753d8f5a" id="sec.392AT" provision.type="other" spent.amends="0"><no>392AT </no><heading guid="_ca36c1d3-4dda-46d8-a009-10b560624586" id="sec.392AT-he">Application may be refused if no reasonable prospects of future geothermal or GHG coordination arrangement</heading><block><txt break.before="1">The Minister may decide to refuse the petroleum lease application if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c59d8867-d229-4bfc-a1c7-0da44c90adce" id="sec.392AT-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the Minister is satisfied the applicant and the overlapping tenure holder have made reasonable attempts to reach the following (a <defterm guid="_7209658c-1829-41d4-aa19-2d48f3631930" id="sec.392AT-def.relevantarrangement" type="definition">relevant arrangement</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fd4b8b4e-c036-46fc-95a8-719e032e6e4b" id="sec.392AT-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">if the overlapping tenure is a geothermal permit—a proposed geothermal coordination arrangement;</txt></block></li><li guid="_bca9a7d4-7f86-4b0d-9de9-eff71a4fd3c6" id="sec.392AT-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the overlapping tenure is a GHG permit—a proposed GHG coordination arrangement; and</txt></block></li></list></block></li><li guid="_e04b058e-08cd-428a-8c19-7c073e9044b1" id="sec.392AT-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">either—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2b486dd0-ddbe-4bab-abcc-f83000224ded" id="sec.392AT-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the overlapping tenure holder has lodged a notice stating there are no reasonable prospects of a relevant arrangement being made; or</txt></block></li><li guid="_43bbcc34-4910-47b5-8c66-b94c3d15ad67" id="sec.392AT-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a relevant arrangement has not been lodged for approval by the Minister and the Minister considers the applicant and the overlapping tenure holder have had a reasonable opportunity to make a relevant arrangement.</txt></block></li></list></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_81142de4-ddc4-4bf4-8000-29f736a909ba" id="sec.392AU" provision.type="other" spent.amends="0"><no>392AU </no><heading guid="_a0bf3c44-0f57-4c42-b9f8-4d27e531049d" id="sec.392AU-he">Additional criteria for deciding provisions of petroleum lease</heading><block><txt break.before="1">In deciding the provisions of the petroleum lease the Minister must consider all of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e4845758-8318-4c15-a1af-2b9b9302eb71" id="sec.392AU-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the information statement;</txt></block></li><li guid="_1c5abda4-2ae8-4744-9dfa-830681a86b8d" id="sec.392AU-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the assessment criteria;</txt></block></li><li guid="_7fee7634-6b27-4298-95c1-23d7e531c141" id="sec.392AU-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">any holder submissions;</txt></block></li><li guid="_9858bba3-5e84-47ea-9854-c37f156b5223" id="sec.392AU-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the effect of the petroleum lease on the safe and efficient carrying out of authorised activities for the overlapping tenure;</txt></block></li><li guid="_c05949f4-e368-425e-92f0-c0781f6f08b3" id="sec.392AU-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">for an overlapping permit—the effect of the petroleum lease on the safe and efficient carrying out of authorised activities for any future lease that may arise from the permit.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_e82f9b66-e71d-4e1b-8d4a-a071fbbe35b5" id="sec.392AV" provision.type="other" spent.amends="0"><no>392AV </no><heading guid="_83f825a7-8efe-4ce8-96fe-6c6819309488" id="sec.392AV-he">Publication of outcome of application</heading><subclause affected.by.uncommenced="0" guid="_bdf45b09-c296-4670-ba60-36bc7cdebb45" id="sec.392AV-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">After the Minister decides whether or not to grant the petroleum lease, the chief executive must publish a notice about the outcome of the petroleum lease application in or on at least 1 of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8a01239f-60b4-4304-8ce0-49799c1deef1" id="sec.392AV-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the gazette;</txt></block></li><li guid="_21c10901-cd4d-4a05-84ed-64acd6ed5190" id="sec.392AV-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the department’s website;</txt></block></li><li guid="_af5a3433-42c1-487a-a21e-1be7da5ea6b2" id="sec.392AV-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">another publication the chief executive considers appropriate.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2b76cad8-c34a-41b1-8ee0-98bceafade6a" id="sec.392AV-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_51ade63f-51c4-43c2-a176-d084a38218f9" id="sec.392AV-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the decision; and</txt></block></li><li guid="_0d4094bc-41e5-48a2-9f48-80b2f1c04afa" id="sec.392AV-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the decision was to grant the petroleum lease—all the petroleum lease’s conditions other than the mandatory conditions; and</txt></block></li><li guid="_0bf87c00-e627-4f7f-9f2c-ea4b939c48ee" id="sec.392AV-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if, under <intref check="valid" refid="ch.3A-pt.2-div.4" target.guid="_ad62defd-e418-4251-8b16-0cc2fa17bdff">division 4</intref>, a resource management decision is required and the decision was to give overlapping authority priority for all or part of the land—the decision, and the reasons for it.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_bc891fd0-a3d9-4e15-a59e-cc3b9125c471" id="sec.392AV-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, if the chief executive considers information in a condition is commercial-in-confidence, the chief executive may, instead of publishing the condition, publish a statement about its intent.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_86338d9c-2bb4-4f2f-8008-54c8fa2c76cf" id="ch.3A-pt.3"><no>Part 3</no><heading guid="_89dad42b-6479-490f-975c-6d12a3ecd7b8" id="ch.3A-pt.3-he">Priority to particular geothermal or GHG lease applications</heading><clause affected.by.uncommenced="0" guid="_2e050ce0-0b31-43bb-94cf-39a0fdaca78d" id="sec.392AW" provision.type="other" spent.amends="0"><no>392AW </no><heading guid="_c8143589-b576-4f1d-9d72-cb74c31b2418" id="sec.392AW-he">Earlier geothermal or GHG lease application</heading><block><txt break.before="1">If—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9b1c8e89-191d-471b-bbb5-fc3b7bfeba64" id="sec.392AW-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a petroleum lease application is made; and</txt></block></li><li guid="_ae699feb-4d21-485d-988d-41afcb01cc34" id="sec.392AW-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">before the making of that application, an application (the <defterm guid="_fde05c1d-0766-4aa2-8049-57c4655a3f69" id="sec.392AW-def.otherapplication" type="definition">other application</defterm>) was made for a geothermal lease or GHG lease (the <defterm guid="_f5ac2b86-a868-4ab4-8bff-8aea1c8e5fa7" id="sec.392AW-def.otherproposedlease" type="definition">other proposed lease</defterm>) but not decided; and</txt></block></li><li guid="_7e8ee1da-72e1-4890-89e6-8cb3b9db3161" id="sec.392AW-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the other application had not been decided before the making of the petroleum lease application; and</txt></block></li><li guid="_cc919112-bb7c-4f47-8de4-03568beae0ce" id="sec.392AW-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the other proposed lease would, if it were granted, be an overlapping authority for the proposed petroleum lease;</txt></block></li></list></block><block><txt break.before="1">the petroleum lease application must not be decided until the other application has been decided.</txt></block></clause><clause affected.by.uncommenced="0" guid="_cf885d79-c153-46f0-a9be-020b237f7b01" id="sec.392AX" provision.type="other" spent.amends="0"><no>392AX </no><heading guid="_3d198696-fa33-45d2-8e62-42ff63b9f583" id="sec.392AX-he">Proposed geothermal or GHG lease for which EIS approval given</heading><subclause affected.by.uncommenced="0" guid="_8e24db37-768b-4bc4-8f38-b099b7202998" id="sec.392AX-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies for a petroleum lease application if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_51797f40-eed0-48be-a3e5-d0a8a36b0dfe" id="sec.392AX-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before the making of the application, an approval under the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act"><name emphasis="no">Environmental Protection Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-1994-062" target.guid="_15fc0bc3-a060-4f70-84e5-3e5a03d6720f" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act">chapter 3</legref>, <legref check="valid" jurisd="QLD" refid="ch.3-pt.2" target.doc.id="act-1994-062" target.guid="_62f60fc4-9df9-4dd5-b38d-a9fb23557f01" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act">part 2</legref> was granted for the voluntary preparation of an EIS; and</txt></block></li><li guid="_eb320d91-ac5f-4252-9c20-bb0e812bc29f" id="sec.392AX-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the EIS is for a project that is, or includes, a proposed geothermal lease or GHG lease (the <defterm guid="_242d10fd-809b-40dc-831a-b0ab45aeb426" id="sec.392AX-ssec.1-def.proposedlease" type="definition">proposed lease</defterm>) for land the subject of the application.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c40b346a-977d-4300-818b-633aec059ee2" id="sec.392AX-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application must not be decided until—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_023a2a88-8fe5-4364-b542-df89b7469b40" id="sec.392AX-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if no application is made for the proposed lease within 1 year after the granting of the approval—the end of that year; or</txt></block></li><li guid="_2a78d696-3a5d-43b5-a608-cd6dfab11135" id="sec.392AX-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if an application is made for the proposed lease within that year—that application is decided.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1fdcecba-2311-4734-ab76-10a562b0083d" id="sec.392AY" provision.type="other" spent.amends="0"><no>392AY </no><heading guid="_10864a17-55c4-4b77-95b8-187919301adc" id="sec.392AY-he">Proposed geothermal or GHG lease declared a coordinated project</heading><subclause affected.by.uncommenced="0" guid="_1bb09f34-4680-4cd8-b1b3-7e003bfc3684" id="sec.392AY-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies for a petroleum lease application if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_507a0e23-e8e1-439e-972a-20f057c27ff6" id="sec.392AY-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before the making of the application, a coordinated project was declared; and</txt></block></li><li guid="_999bee69-5f1d-43d2-9934-c87ef6e32380" id="sec.392AY-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the project is, or includes, a proposed geothermal lease or GHG lease (the <defterm guid="_fc484ba6-d49f-4546-a2d6-7884364fe490" id="sec.392AY-ssec.1-def.proposedlease" type="definition">proposed lease</defterm>) for land the subject of the application.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_04ac91b8-43ba-45d0-8638-d98757568630" id="sec.392AY-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application must not be decided until—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ce0d82fb-0ac4-4b9c-9cbd-3549a495e53c" id="sec.392AY-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if no application is made for the proposed lease within 1 year after the making of the declaration—the end of that year; or</txt></block></li><li guid="_e2a7ddf2-8b30-473a-b3e8-ec0c7dfd1cd5" id="sec.392AY-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if an application is made for the proposed lease within that year—that application is decided.</txt></block></li></list></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_d8e5fa02-98bc-455c-b411-afb87ba30d0e" id="ch.3A-pt.4"><no>Part 4</no><heading guid="_b13fd62b-1312-455e-9ec1-bbea8e60dfed" id="ch.3A-pt.4-he">Petroleum lease applications in response to invitation under <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref> or <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref></heading><clause affected.by.uncommenced="0" guid="_2f3c75ee-1457-47a0-87a1-f56a624583fe" id="sec.392AZ" provision.type="other" spent.amends="0"><no>392AZ </no><heading guid="_ac645e60-f8fa-423a-abe8-cf1f06a16208" id="sec.392AZ-he">Application of <intref check="valid" refid="ch.3A-pt.4" target.guid="_d8e5fa02-98bc-455c-b411-afb87ba30d0e">pt 4</intref></heading><block><txt break.before="1">This part applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5c941945-9651-4959-827b-bb8dbf6208fe" id="sec.392AZ-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a petroleum lease application is made in response to an invitation given because of a resource management decision under the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref> or the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref>; and</txt></block></li><li guid="_220438db-e92d-419b-b7e3-e09b60c50518" id="sec.392AZ-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the application is made within 6 months after the giving of the invitation.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_b62cad14-5456-41ba-a7be-d2ee4ab8e081" id="sec.392BA" provision.type="other" spent.amends="0"><no>392BA </no><heading guid="_f9eb7393-b127-40bc-b811-4116a3bdf632" id="sec.392BA-he">Additional ground for refusing application</heading><subclause affected.by.uncommenced="0" guid="_f553997e-2fcd-4af3-a389-801efb7ccd98" id="sec.392BA-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may decide to refuse the application if satisfied the applicant has not in a timely manner—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f7177f44-2a21-4b4a-8135-866e0768b9f2" id="sec.392BA-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">taken any step for the application required of the applicant under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref> or <intref check="valid" refid="ch.3" target.guid="_7d989cb7-da2a-4737-842c-bd1944dbb54e">3</intref> or this chapter; or</txt></block></li><li guid="_19742974-0ec7-48c1-9d82-ccf0a15412aa" id="sec.392BA-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">satisfied the Minister about a matter that under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref> or <intref check="valid" refid="ch.3" target.guid="_7d989cb7-da2a-4737-842c-bd1944dbb54e">3</intref> or this chapter is required for the granting of the application.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6b5eca72-c12a-4f94-9bb9-dbb39a01a5d9" id="sec.392BA-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.392BA-ssec.1" target.guid="_f553997e-2fcd-4af3-a389-801efb7ccd98">Subsection (1)</intref> does not limit <intref check="valid" refid="sec.843A" target.guid="_cc9ec269-641a-4758-bea2-7d374790f8d6">section 843A</intref>.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_fa8a3d9c-8f2e-42e4-9995-76304c3d08e0" id="ch.3A-pt.5"><no>Part 5</no><heading guid="_d5b74ad0-c72e-4fc0-9961-ccd2d452c1f5" id="ch.3A-pt.5-he">Additional provisions for petroleum authorities</heading><division affected.by.uncommenced="0" guid="_9f761385-107e-4416-bc7c-d9f037b3970f" id="ch.3A-pt.5-div.1"><no>Division 1</no><heading guid="_dd9aaab8-eff9-4903-a11f-e0668961def4" id="ch.3A-pt.5-div.1-he">Restrictions on authorised activities for particular petroleum authorities</heading><clause affected.by.uncommenced="0" guid="_6c891a57-0ec1-4172-90de-05b866043cd9" id="sec.392BB" provision.type="other" spent.amends="0"><no>392BB </no><heading guid="_7b40cb05-6705-400e-8590-cbb4bf3b0589" id="sec.392BB-he">Overlapping geothermal or GHG lease</heading><subclause affected.by.uncommenced="0" guid="_42a3d80e-f14d-4074-96c6-041143ed23dd" id="sec.392BB-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if land in the area of any of the following petroleum authorities is in the area of a geothermal lease or GHG lease—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9a98007b-d894-447e-b67e-901febd53979" id="sec.392BB-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an authority to prospect;</txt></block></li><li guid="_ad885670-e58a-4a45-ac5e-b0e799a2f37f" id="sec.392BB-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a data acquisition authority;</txt></block></li><li guid="_c672d45a-f17b-478c-b35a-2e32b6d81722" id="sec.392BB-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a water monitoring authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_231d2f55-eec7-40dd-859b-b437d1e870c3" id="sec.392BB-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, this section does not apply if the same person holds the petroleum authority and the geothermal lease or GHG lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bfb7062b-f4cf-485d-a95a-17506a3b5445" id="sec.392BB-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">An authorised activity for the petroleum authority may be carried out on the land only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3f35a4a0-9c29-43b4-9ccf-56abdca24e09" id="sec.392BB-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the geothermal lease or GHG lease holder has not, in the way required under <intref check="valid" refid="sec.392BB-ssec.4" target.guid="_346f18d1-2cdc-4cf3-9f53-40bf33d1bc6e">subsection (4)</intref>, objected to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3c06dbaa-7481-4f2b-a059-f49018fac66f" id="sec.392BB-ssec.3-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the carrying out of the activity; and</txt></block></li><li guid="_0bf2c7d1-b9b8-4b45-be81-1cbf3676655b" id="sec.392BB-ssec.3-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if <intref check="valid" refid="ch.9" target.guid="_e115e3d8-9707-4c5d-b3e6-be71f8d522ee">chapter 9</intref> requires a safety management system for the petroleum authority—the safety management system; or</txt></block></li></list></block></li><li guid="_368ac470-c8a4-4132-9707-af93bd744fa5" id="sec.392BB-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if an objection under <intref check="valid" refid="sec.392BB-ssec.3-para1.a" target.guid="_3f35a4a0-9c29-43b4-9ccf-56abdca24e09">paragraph (a)</intref> has been made—the Minister has, under <intref check="valid" refid="sec.392BD" target.guid="_b4b9620a-a29e-425e-a89e-c3db937609f1">section 392BD</intref>, decided the authorised activity may be carried out.</txt></block></li></list><note guid="_eed000b7-5d3a-436f-a439-941b874a265e" id="sec.392BB-ssec.3-note" type="example"><heading guid="_d44dc5c5-a969-49c3-9a84-771073f8c661" id="sec.392BB-ssec.3-note-he">Note—</heading><block><txt break.before="1">For notice of authorised activities, see <intref check="valid" refid="sec.392BF" target.guid="_c477d9a3-befd-44d6-8251-778cf4736029">section 392BF</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_346f18d1-2cdc-4cf3-9f53-40bf33d1bc6e" id="sec.392BB-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The objection must be written, given to the petroleum authority holder and lodged.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8c0de309-e561-4184-a1d0-5e0ee8149132" id="sec.392BC" provision.type="other" spent.amends="0"><no>392BC </no><heading guid="_65b6a49e-2ca6-479d-9116-bf1cdb4df963" id="sec.392BC-he">Overlapping geothermal permit or particular GHG authorities</heading><subclause affected.by.uncommenced="0" guid="_ecb61caa-fbf4-46cb-90bf-73c50a398e81" id="sec.392BC-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if land in the area of any of the following petroleum authorities is in the area of a geothermal permit or a GHG authority other than a GHG lease—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b3a24ce1-f64b-4076-afd3-07fe9cbe9c1c" id="sec.392BC-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an authority to prospect;</txt></block></li><li guid="_2692683c-8eca-4b0b-9db7-5d0746d13731" id="sec.392BC-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a data acquisition authority;</txt></block></li><li guid="_2c1fb825-6a7a-4fe7-97a7-64111d9a12a4" id="sec.392BC-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a water monitoring authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9a9a1051-b72f-4fdd-9014-37c9d0db31ca" id="sec.392BC-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An authorised activity for the petroleum authority can not be carried out on the land if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_61018112-ec3e-42cc-8c06-424f3c57efd6" id="sec.392BC-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">carrying out the activity adversely affects the carrying out of an authorised activity for the geothermal permit or GHG authority; and</txt></block></li><li guid="_93d3b80e-278c-4a8f-8814-b0dc79f68f43" id="sec.392BC-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the authorised activity for the geothermal permit or GHG authority has already started.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b4b9620a-a29e-425e-a89e-c3db937609f1" id="sec.392BD" provision.type="other" spent.amends="0"><no>392BD </no><heading guid="_e87315ed-6fd1-4ac7-9e2b-3f65c2f6d0d4" id="sec.392BD-he">Resolving disputes</heading><subclause affected.by.uncommenced="0" guid="_0c6e5874-4070-4595-91c7-6e4cd3837153" id="sec.392BD-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, under <intref check="valid" refid="sec.392BB" target.guid="_6c891a57-0ec1-4172-90de-05b866043cd9">section 392BB</intref>, a geothermal lease or GHG lease holder has objected to the carrying out of an authorised activity by a petroleum authority holder.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6cdbfbe8-f56d-4dca-9d64-713f9e65ff98" id="sec.392BD-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">This section also applies if there is a dispute between a petroleum authority holder and a geothermal permit or GHG authority holder about whether an authorised activity for the petroleum authority can be carried out under <intref check="valid" refid="sec.392BC" target.guid="_8c0de309-e561-4184-a1d0-5e0ee8149132">section 392BC</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8961d7f9-4734-4985-951b-a32e669b1fa1" id="sec.392BD-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Either of the parties may, by a notice in the approved form, ask the Minister to decide—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8400f0c1-52df-4639-9765-963214afd4e9" id="sec.392BD-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for <intref check="valid" refid="sec.392BB" target.guid="_6c891a57-0ec1-4172-90de-05b866043cd9">section 392BB</intref>—whether the authorised activity may be carried out under that section; or</txt></block></li><li guid="_b8b88c11-e2ff-413a-8f0c-418624cefc5e" id="sec.392BD-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for <intref check="valid" refid="sec.392BC" target.guid="_8c0de309-e561-4184-a1d0-5e0ee8149132">section 392BC</intref>—whether the authorised activity may be carried out under that section.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a0665213-879f-4f2b-b374-6498e5780144" id="sec.392BD-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Before making the decision, the Minister must give the parties a reasonable opportunity to make submissions about the request within a reasonable period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_633d31eb-a1f1-45c8-b795-43bacbec81a5" id="sec.392BD-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The Minister must, after complying with <intref check="valid" refid="sec.392BD-ssec.4" target.guid="_a0665213-879f-4f2b-b374-6498e5780144">subsection (4)</intref> and considering any submission made under that subsection, decide the matter and give the parties notice of the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e1e95d61-02f8-4183-9720-293380552564" id="sec.392BD-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The Minister’s decision binds the parties.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_437c2f1b-358a-4aa5-a559-b9f969e2225f" id="sec.392BD-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">If the request is about a matter mentioned in <intref check="valid" refid="sec.392BD-ssec.1" target.guid="_0c6e5874-4070-4595-91c7-6e4cd3837153">subsection (1)</intref>, the Minister may impose conditions on any decision that the authorised activity may be carried out.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9b92fef6-009b-4645-90da-3745025ff5c7" id="sec.392BD-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_58da5389-f10f-4190-98e8-e976f476ff51" id="sec.392BD-ssec.8-def.parties_"><txt break.before="1"><defterm guid="_87bfaeeb-b47e-4375-ad47-9d921c071164" id="sec.392BD-ssec.8-def.parties" type="definition">parties</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_99e36d06-a569-4a58-9509-5a52eb563ede" id="sec.392BD-ssec.8-def.parties-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for a request about a matter mentioned in <intref check="valid" refid="sec.392BD-ssec.1" target.guid="_0c6e5874-4070-4595-91c7-6e4cd3837153">subsection (1)</intref>—the petroleum authority holder and the geothermal lease or GHG lease holder; or</txt></block></li><li guid="_1f70886f-fc76-4fc7-8f0d-cf03d7d6f8b2" id="sec.392BD-ssec.8-def.parties-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for a request about a matter mentioned in <intref check="valid" refid="sec.392BD-ssec.2" target.guid="_6cdbfbe8-f56d-4dca-9d64-713f9e65ff98">subsection (2)</intref>—the petroleum authority holder and the geothermal permit or GHG authority holder.</txt></block></li></list></definition></deflist></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_087bca2f-3ee3-4685-8333-e9afa9d479b8" id="ch.3A-pt.5-div.2"><no>Division 2</no><heading guid="_7677e096-0dd9-4302-8960-06edd99b28c2" id="ch.3A-pt.5-div.2-he">Additional conditions</heading><clause affected.by.uncommenced="0" guid="_b2ad95d5-e831-4d34-a7ec-a95413a5e06e" id="sec.392BE" provision.type="other" spent.amends="0"><no>392BE </no><heading guid="_a21d397e-8fa0-4b7e-abd0-7fbe5f77d3e8" id="sec.392BE-he">Notice by authority to prospect holder to particular geothermal tenure or GHG authority holders or applicants</heading><subclause affected.by.uncommenced="0" guid="_92bd8d44-2983-47f6-878e-2c98bb52bcf5" id="sec.392BE-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4a7aed7d-e071-4411-a436-aeee2786b6f8" id="sec.392BE-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an authority to prospect is granted (the <defterm guid="_c245e37a-2c4d-478d-922b-03025529470f" id="sec.392BE-ssec.1-def.ATP" type="definition">ATP</defterm>); and</txt></block></li><li guid="_8dc99739-95fb-4809-b790-c3a6c3309c70" id="sec.392BE-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">land in the authority to prospect’s area is in the area of, or in a proposed area under an application for any of the following (the <defterm guid="_e6e039a0-6caf-4947-adfd-782937c84047" id="sec.392BE-ssec.1-def.otherauthority" type="definition">other authority</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ebe1242e-13a6-4de9-a072-4c0e106acfb8" id="sec.392BE-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a geothermal permit;</txt></block></li><li guid="_e6d3dbd5-bd43-45a6-9c82-641c2c7f6e75" id="sec.392BE-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a GHG permit;</txt></block></li><li guid="_045c16cd-8b17-425d-aa04-53476512207a" id="sec.392BE-ssec.1-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">a GHG data acquisition authority under the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref>.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_87f2cc16-c733-4803-a373-4934ba34993e" id="sec.392BE-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">It is a condition of the authority to prospect that its holder must, within 20 business days after the holder receives notice of the grant of the ATP, give the holder of, or the applicant for, the other authority a notice stating—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_26488962-edea-4db7-9de8-6bde6d681f25" id="sec.392BE-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the ATP has been granted; and</txt></block></li><li guid="_776b836d-2f40-4f4c-824c-1ac787f7f7a7" id="sec.392BE-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the ATP holder’s name; and</txt></block></li><li guid="_09d464ed-079e-486e-bed1-e0855a3d8f4c" id="sec.392BE-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the term of the ATP.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c477d9a3-befd-44d6-8251-778cf4736029" id="sec.392BF" provision.type="other" spent.amends="0"><no>392BF </no><heading guid="_227baa4b-4f91-4200-8fa6-a10efda13d09" id="sec.392BF-he">Condition to notify particular geothermal tenure or GHG authority holders of proposed start of particular authorised activities</heading><subclause affected.by.uncommenced="0" guid="_7b917434-2661-4356-8212-b9739f5f62dc" id="sec.392BF-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to a petroleum authority holder if there is either of the following (the <defterm guid="_cfe218df-2b7c-42d6-89cc-e736f16cb0d9" id="sec.392BF-def.otherauthority" type="definition">other authority</defterm>) for the petroleum authority—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7acadce4-e092-4ab6-b96d-028fa53f6223" id="sec.392BF-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an overlapping authority;</txt></block></li><li guid="_ffae7e61-0da5-4ebb-a7a9-1a8d12bb4d76" id="sec.392BF-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a geothermal tenure or GHG authority sharing a common boundary with the petroleum authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f8d35d3b-7108-45d9-955e-36ad7a94894f" id="sec.392BF-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Before the petroleum authority holder first starts a designated activity in the other authority’s area, the petroleum authority holder must give the other authority holder at least 30 business days notice of the activity.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_051eff9b-0679-4f50-b0cd-ecd397b51506" id="sec.392BF-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A notice under <intref check="valid" refid="sec.392BF-ssec.2" target.guid="_f8d35d3b-7108-45d9-955e-36ad7a94894f">subsection (2)</intref> must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_42b96d1f-f0ba-4dea-8b74-b59f7a94923a" id="sec.392BF-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">when the designated activity is to start; and</txt></block></li><li guid="_039bcee6-9166-44b5-b9ba-320c54e3ce05" id="sec.392BF-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">where the designated activity is to be carried out; and</txt></block></li><li guid="_f27fde32-70fa-4f39-a405-6c89b042f896" id="sec.392BF-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the nature of the activity.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_caa11b83-2a4d-4a00-8ce9-46bf0b9bdf97" id="sec.392BF-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Before changing the land on which the designated activity is being carried out, the petroleum authority holder must give the other authority holder at least 30 business days notice stating where the activity is to be carried out.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3c6f815e-c2f9-44fb-a151-4341f86bc01a" id="sec.392BF-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Compliance with this section is a condition of the petroleum authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a396f647-9bfd-40df-91bd-b92e114d086a" id="sec.392BF-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_eb15f4b4-3065-4b5f-b063-3c18695d9d4c" id="sec.392BF-ssec.6-def.designatedactivity_"><txt break.before="1"><defterm guid="_8773e459-b5c8-4ec7-a3fb-cca784caeb28" id="sec.392BF-ssec.6-def.designatedactivity" type="definition">designated activity</defterm> means any authorised activity for the petroleum authority, other than—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3bf1a5e0-ffef-4528-9f35-85dea210d014" id="sec.392BF-ssec.6-def.designatedactivity-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an incidental activity under <intref check="valid" refid="sec.33" target.guid="_40d20d00-5908-4940-8068-947039fa8c08">section 33</intref> or <intref check="valid" refid="sec.112" target.guid="_731440f8-db42-45db-bf1c-fcf7ac5289b1">112</intref>; or</txt></block></li><li guid="_4d704c91-9e13-4b53-a428-ddc0327404b8" id="sec.392BF-ssec.6-def.designatedactivity-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an activity only involving selecting places where other authorised activities for the petroleum authority may be carried out.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_747ab8c5-89bd-4d17-a9ad-f2098db1b8ac" id="sec.392BG" provision.type="other" spent.amends="0"><no>392BG </no><heading guid="_4e440ae3-ca98-4d6a-9fbd-43720ce5b282" id="sec.392BG-he">Requirement to continue geothermal or GHG coordination arrangement after renewal of or dealing with petroleum lease</heading><subclause affected.by.uncommenced="0" guid="_4d4890c9-5372-4695-b04e-d282181b0cde" id="sec.392BG-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8630207f-5e64-4952-ad31-7d7383b0f888" id="sec.392BG-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a petroleum lease has an overlapping authority (geothermal or GHG) that is a geothermal lease or GHG lease (the <defterm guid="_89697ef6-ab71-485f-9625-2166b0aad9b4" id="sec.392BG-ssec.1-def.otherlease" type="definition">other lease</defterm>); and</txt></block></li><li guid="_08160699-041a-40ac-835d-c52a8333b531" id="sec.392BG-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a geothermal coordination arrangement or GHG coordination arrangement applies to the petroleum lease; and</txt></block></li><li guid="_2624dfca-099a-42ed-a6e7-cbc084740d1c" id="sec.392BG-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">any of the following take place for the petroleum lease—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_76671b5a-a075-4963-a50d-501c691865c3" id="sec.392BG-ssec.1-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a renewal;</txt></block></li><li guid="_eda5d806-a534-4a55-966e-a201dbfee6c6" id="sec.392BG-ssec.1-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a transfer;</txt></block></li><li guid="_e037f326-7976-42a5-b1f2-bdc3d57e7441" id="sec.392BG-ssec.1-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">a subletting of the lease or a share in the petroleum lease.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_803f9771-6cc0-4867-8d3f-7e29d6150664" id="sec.392BG-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">It is a condition of the petroleum lease that its holder must continue to be a party to the following for the lease while the other lease continues in force—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c05f3a4a-82c8-455d-8021-8f0bd0b6fd50" id="sec.392BG-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the other lease is a geothermal lease—a geothermal coordination arrangement;</txt></block></li><li guid="_3794d28a-7002-4983-98b2-4f2896023915" id="sec.392BG-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the other lease is a GHG lease—a GHG coordination arrangement.</txt></block></li></list></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_c201e9ac-7339-48b8-b7c9-7af2fdacd039" id="ch.3A-pt.5-div.3"><no>Division 3</no><heading guid="_afb7873f-2f37-49bc-b509-f00492aac0c8" id="ch.3A-pt.5-div.3-he">Restriction on Minister’s power to amend petroleum lease if overlapping tenure</heading><clause affected.by.uncommenced="0" guid="_26846ab3-e948-4e9a-84f7-c73c4c534913" id="sec.392BH" provision.type="other" spent.amends="0"><no>392BH </no><heading guid="_71c24021-1bc9-4e92-ba01-2bde687e6228" id="sec.392BH-he">Interests of overlapping tenure holder to be considered</heading><block><txt break.before="1">If there is an overlapping tenure for a petroleum tenure, the petroleum tenure may be amended under <intref check="valid" refid="sec.848" target.guid="_854ad862-1041-4141-9139-09cae4f9c00a">section 848</intref> only if the Minister has considered the interests of the overlapping tenure holder.</txt></block></clause></division></part><part affected.by.uncommenced="0" guid="_ed76cd77-f590-4d50-a8ac-fa82b545759b" id="ch.3A-pt.6"><no>Part 6</no><heading guid="_2caa226e-4437-422f-89f7-e9d39655bccc" id="ch.3A-pt.6-he">Additional provisions for development plans if overlapping tenure</heading><clause affected.by.uncommenced="0" guid="_8e1f4bf2-8f93-4a30-a587-b75bb0d8e088" id="sec.392BI" provision.type="other" spent.amends="0"><no>392BI </no><heading guid="_751ced44-4104-4873-b602-89bcef3b7d34" id="sec.392BI-he">Operation of <intref check="valid" refid="ch.3A-pt.6" target.guid="_ed76cd77-f590-4d50-a8ac-fa82b545759b">pt 6</intref></heading><block><txt break.before="1">This part imposes additional requirements for the following for which there is an overlapping authority (geothermal or GHG) that is an overlapping tenure—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fa1937a4-ee2b-44c8-9771-e10da58e5e12" id="sec.392BI-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a proposed initial development plan for a proposed initial development plan for a petroleum lease;</txt></block></li><li guid="_dadc8b17-d492-4571-ae3a-2827f0fe5cac" id="sec.392BI-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a proposed later development plan for a petroleum lease.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_82e23bc0-dc66-4ffa-a257-9193ba633e99" id="sec.392BJ" provision.type="other" spent.amends="0"><no>392BJ </no><heading guid="_1a38d3a0-a240-454f-a926-163391dc298b" id="sec.392BJ-he">Statement about interests of overlapping tenure holder</heading><block><txt break.before="1">The proposed development plan or amendment must include a statement of how the effects on and the interests of the overlapping tenure holder have or have not been considered having regard to the assessment criteria.</txt></block></clause><clause affected.by.uncommenced="0" guid="_5eb60a35-82d9-4dc6-8fd9-bcaf74c88651" id="sec.392BK" provision.type="other" spent.amends="0"><no>392BK </no><heading guid="_48cbf136-0965-4b41-aa2d-cd77dd58a150" id="sec.392BK-he">Consistency with overlapping tenure’s development plan and with any relevant coordination arrangement</heading><subclause affected.by.uncommenced="0" guid="_4e9d394f-8799-4074-ae55-09148b9c8874" id="sec.392BK-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">To the extent the area of the petroleum lease and the overlapping tenure coincide or will coincide, the proposed development plan must be consistent with any geothermal coordination arrangement or GHG coordination arrangement for that area.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_88141b63-3090-4347-b819-25356e0b7f4d" id="sec.392BK-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.392BK-ssec.3" target.guid="_630b8eba-117e-4a4d-898b-4cb0d44c00c7">Subsection (3)</intref> applies only if the overlapping tenure is an overlapping lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_630b8eba-117e-4a4d-898b-4cb0d44c00c7" id="sec.392BK-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The proposed plan must, to the extent the area of the petroleum lease and the overlapping lease coincide, or will coincide, be consistent with the development plan for the overlapping lease.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_dc3f59eb-7e1a-4b89-aedc-0f180b7a4697" id="sec.392BL" provision.type="other" spent.amends="0"><no>392BL </no><heading guid="_035af07f-3b4c-4232-bb5a-444a67b8cb3c" id="sec.392BL-he">Additional criteria for approval</heading><block><txt break.before="1">In deciding whether to approve the proposed development plan, the Minister must consider the assessment criteria.</txt></block></clause></part><part affected.by.uncommenced="0" guid="_f6d86b37-a5bd-4d65-bcab-8f1b01a38cce" id="ch.3A-pt.7"><no>Part 7</no><heading guid="_057ae5df-6554-44e0-97d3-2a1b80ba20a9" id="ch.3A-pt.7-he">Additional provisions for safety management systems</heading><clause affected.by.uncommenced="0" guid="_84c80e81-d425-4abb-b252-d5b23312bf96" id="sec.392BM" provision.type="other" spent.amends="0"><no>392BM </no><heading guid="_a090e4aa-3fa8-4d7b-9bb6-8860620c8d1b" id="sec.392BM-he">Grant of petroleum lease does not affect obligation to make safety management system</heading><subclause affected.by.uncommenced="0" guid="_3d7a0859-1525-4948-ab78-c002434d4e8c" id="sec.392BM-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if an information statement accompanies a petroleum lease application as required under this chapter.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8b1a0c29-5533-4f8e-85f6-1dfe43368783" id="sec.392BM-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The deciding of the application or the grant of the petroleum lease—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e975146f-0d00-4f45-b471-4cf38d7594d6" id="sec.392BM-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">does not affect the obligation to make a safety management system for any operating plant in the petroleum lease’s area; and</txt></block></li><li guid="_cb36f75e-6d94-497a-a681-a0122d1de57b" id="sec.392BM-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is not of itself evidence that a safety management system or purported safety management system for an operating plant on the petroleum lease’s area complies with <intref check="valid" refid="ch.9" target.guid="_e115e3d8-9707-4c5d-b3e6-be71f8d522ee">chapter 9</intref>.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_38f0fd7a-2e69-4363-9ae8-a641ec36c32a" id="sec.392BN" provision.type="other" spent.amends="0"><no>392BN </no><heading guid="_8ac8d725-4ab2-49aa-b619-124ed42bdae0" id="sec.392BN-he">Requirements for consultation with particular overlapping tenure holders</heading><subclause affected.by.uncommenced="0" guid="_a6481353-ebc5-4a05-bf70-d2f9d7f295b2" id="sec.392BN-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a2d43469-15bd-496f-90bd-3194640f0755" id="sec.392BN-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a person (an <defterm guid="_0312ff8c-ecf2-4cc3-9fd4-af67ea45c002" id="sec.392BN-ssec.1-def.operator" type="definition">operator</defterm>) proposes to be an operator of operating plant in the area of a petroleum tenure; and</txt></block></li><li guid="_e4683355-3ab1-409b-9025-24c08ce26506" id="sec.392BN-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">activities (<defterm guid="_42b08199-82be-4356-98ec-5b69750b66e7" id="sec.392BN-ssec.1-def.relevantactivities" type="definition">relevant activities</defterm>) carried out, or proposed to be carried out, at the plant may adversely affect the safe and efficient carrying out of authorised activities for an overlapping authority (geothermal or GHG) for the petroleum tenure; and</txt></block></li><li guid="_afed2f1a-a0b3-4864-8696-dfd8c8f775a1" id="sec.392BN-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the overlapping authority (geothermal or GHG) is an overlapping tenure.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_51e5d85b-6485-432c-a11c-acec79dce094" id="sec.392BN-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Before any operator may operate relevant operating plant, each operator must have made reasonable attempts to consult with the overlapping tenure holder about relevant activities for the plant.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_193aa40f-cb6e-4ae2-9ee6-3a5e89a77aec" id="sec.392BN-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If there is more than 1 operator, the petroleum tenure holder may coordinate the consultation between the operators and the overlapping tenure holder.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_27fd42e6-b3dd-41e2-934f-991ab2f27b49" id="sec.392BN-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">For <intref check="valid" refid="sec.392BN-ssec.2" target.guid="_51e5d85b-6485-432c-a11c-acec79dce094">subsection (2)</intref>, an operator is taken to have made reasonable attempts to consult if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8e0e6dd6-604b-4730-bc5d-bfb8ac326053" id="sec.392BN-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the operator gives the overlapping tenure holder an overview of the relevant parts of the operator’s proposed safety management system concerning any relevant operating plant the operator proposes to operate for the relevant activities; and</txt></block></li><li guid="_660016cc-da3f-467b-936a-ceb9e652a282" id="sec.392BN-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the overlapping tenure holder has not within 30 days after the giving of the overview made any proposal to the operator about provisions for the system.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_32aa6fe5-868f-4b17-a98e-571d95755863" id="sec.392BN-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">An operator must, before making or remaking a safety management system for any relevant operating plant the operator operates or proposes to operate, have regard to any reasonable provisions for the system proposed by the overlapping tenure holder concerning relevant activities for the plant.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4e0665a3-5bec-4c97-a605-9f7c537e8d39" id="sec.392BN-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">However, the obligation under <intref check="valid" refid="sec.392BN-ssec.5" target.guid="_32aa6fe5-868f-4b17-a98e-571d95755863">subsection (5)</intref> applies only to the extent the provisions are commercially and technically feasible for the operator or any relevant petroleum tenure holder.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_be88c399-8a43-4422-8768-038fc2780e40" id="sec.392BN-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">If an operator makes a safety management system for relevant operating plant and the system includes provisions proposed by the overlapping tenure holder, the operator must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6e84529a-8314-4843-bb66-870624115cb4" id="sec.392BN-ssec.7-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">give the overlapping tenure holder an overview of the safety management system; and</txt></block></li><li guid="_3bdac463-b6b6-4e62-9a4a-e605f353dafa" id="sec.392BN-ssec.7-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">lodge a notice stating any provisions proposed under <intref check="valid" refid="sec.392BN-ssec.5" target.guid="_32aa6fe5-868f-4b17-a98e-571d95755863">subsection (5)</intref> and whether they were included in the system.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_90c690bd-f9cd-4af8-aaca-7fcec6efef5f" id="sec.392BN-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_87e85358-81e3-436c-be02-8e0aea14b16c" id="sec.392BN-ssec.8-def.remaking_"><txt break.before="1"><defterm guid="_c8a4d609-6eab-41ca-8ad3-43cd489d1eb2" id="sec.392BN-ssec.8-def.remaking" type="definition">remaking</defterm>, a safety management system, includes an amendment or remaking of the system of a type required under <intref check="valid" refid="sec.678" target.guid="_5866f51f-4c62-40b8-8825-15676b967ab1">section 678</intref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7e5c0fff-29bb-4d61-9cbb-642551404422" id="sec.392BO" provision.type="other" spent.amends="0"><no>392BO </no><heading guid="_1097c8b4-8eae-4f17-bb99-e0440281d215" id="sec.392BO-he">Application of provisions for resolving disputes about reasonableness of proposed provision</heading><subclause affected.by.uncommenced="0" guid="_3f1319cb-0a52-4fbb-990b-d2831a939faa" id="sec.392BO-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a dispute exists between an operator to which <intref check="valid" refid="sec.392BN" target.guid="_38f0fd7a-2e69-4363-9ae8-a641ec36c32a">section 392BN</intref> applies and an overlapping tenure holder about the reasonableness of a provision proposed by the tenure holder for the operator’s proposed safety management system.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b09af0d1-fa35-4f73-8a91-86613b1adc0f" id="sec.392BO-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Either party to the dispute may refer it to the chief inspector to decide whether the proposed provision is reasonable.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d1d83abd-9127-42c8-80ce-7e14d99d886f" id="sec.392BO-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The referral must be written and be lodged.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_12669c3b-e019-4ea0-9a23-94bb668d1357" id="sec.392BO-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Before deciding the dispute, the chief inspector must give each party a reasonable opportunity to lodge submissions about the dispute.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_450e5be6-0d5c-4b93-80e5-e048cdd19b40" id="sec.392BO-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The chief inspector’s decision binds each party to the dispute.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_08b87608-70a1-4859-ade3-82a3ff7691e9" id="sec.392BO-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The chief inspector must give each party an information notice about the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_84ac399c-c16f-45be-831e-ad09de83d0ae" id="sec.392BO-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">The chief inspector’s decision is not, of itself, evidence that a safety management system, or purported safety management system, for an operating plant complies with <intref check="valid" refid="sec.675" target.guid="_28bc8c66-267c-4d67-9a55-97f681bdb4b3">section 675</intref>.</txt></block></subclause></clause></part></chapter><chapter affected.by.uncommenced="0" guid="_bce3f736-0a5e-4ba6-b741-c213b453c013" id="ch.4"><no>Chapter 4</no><heading guid="_9b90e3c4-1513-4ff6-81ca-14b7a8797a53" id="ch.4-he">Licences and related matters</heading><note guid="_2fd90441-9a2b-4604-903e-d6bcb1ee134b" id="ch.4-note" type="example"><heading guid="_bc1ab933-654e-4108-828a-4455a2ece52a" id="ch.4-note-he">Note—</heading><block><txt break.before="1">For when a licence is required, see <intref check="valid" refid="sec.802" target.guid="_951fb107-63e2-4a7d-88a5-e195517a9882">sections 802</intref> and <intref check="valid" refid="sec.803" target.guid="_2c8d2aa3-d8dc-4b11-aff4-7fc962147fea">803</intref>.</txt></block></note><part affected.by.uncommenced="0" guid="_f2db8c90-3c86-4964-8421-2a9835d34838" id="ch.4-pt.1"><no>Part 1</no><heading guid="_07cfcca8-83f9-4c38-b8bb-e59e9f2c18b7" id="ch.4-pt.1-he">Survey licences</heading><division affected.by.uncommenced="0" guid="_c9bce16c-032b-4243-85d2-69d5585b50c5" id="ch.4-pt.1-div.1"><no>Division 1</no><heading guid="_4a98edc4-520c-4750-8c9a-c1c0c6b94f0a" id="ch.4-pt.1-div.1-he">Key authorised activities</heading><clause affected.by.uncommenced="0" guid="_9ff3926f-c653-4e39-b084-d7e44ccaf076" id="sec.393" provision.type="other" spent.amends="0"><no>393</no><heading guid="_e208a5cd-933b-4e11-ad12-ce283e9f4281" id="sec.393-he">Operation of <intref check="valid" refid="ch.4-pt.1-div.1" target.guid="_c9bce16c-032b-4243-85d2-69d5585b50c5">div 1</intref></heading><block><txt break.before="1">This division provides for the key authorised activities for a survey licence.</txt><note guid="_66fea8f7-040d-48d4-893d-782e6fdadfd6" id="sec.393-note" type="example"><heading guid="_c295f745-da59-4488-99c5-666652474510" id="sec.393-note-he">Note—</heading><block><txt break.before="1">For other authorised activities, see the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-2014-047" target.guid="_78e7ee55-dcff-4087-b0b9-13497e839af3" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">chapter 3</legref>, <legref check="valid" jurisd="QLD" refid="ch.3-pt.2" target.doc.id="act-2014-047" target.guid="_adcc85c6-c389-49c8-b998-858dca31ac1f" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">part 2</legref>, <legref check="invalid" jurisd="QLD" type="act">division 4</legref>.</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_5e798ca2-bc66-4101-9259-745026f9e34c" id="sec.394" provision.type="other" spent.amends="0"><no>394</no><heading guid="_b9530811-bc01-437a-a1a1-86497fc59727" id="sec.394-he">Surveying activities</heading><subclause affected.by.uncommenced="0" guid="_f0db648f-9bfc-4058-bc8f-205119b9c9cf" id="sec.394-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A survey licence holder may enter the area of the licence to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2cc78e1a-ee2d-404f-b368-110c0116a362" id="sec.394-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">investigate and survey its potential and suitability for the construction and operation of pipelines or petroleum facilities; and</txt></block></li><li guid="_f1febac5-eeb2-41cb-a515-d36816f0f182" id="sec.394-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">identify possible pipeline routes and pipeline or petroleum facility access routes.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a1f43ee6-0dd4-4059-bfed-7d72d183583d" id="sec.394-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The carrying out of activities mentioned in <intref check="valid" refid="sec.394-ssec.1" target.guid="_f0db648f-9bfc-4058-bc8f-205119b9c9cf">subsection (1)</intref> is subject to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c9bced26-d1ff-482e-b258-c3f5442c36c4" id="sec.394-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0"><intref check="valid" refid="sec.6" target.guid="_6c6a5ac8-799d-44d8-9fef-34a0d04ecce2">section 6</intref>; and</txt></block></li><li guid="_bde4fb4f-825e-4cf9-918e-bb3d4c3b4d2d" id="sec.394-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0"><intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref>; and</txt></block></li><li guid="_71ac134d-8377-45ac-9605-0c6a99449a25" id="sec.394-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the mandatory and other conditions of the licence; and</txt></block></li><li guid="_f39b341a-d689-486a-acdc-18c5022093d2" id="sec.394-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">any exclusion or restriction provided for in the licence on the carrying out of the activities; and</txt></block></li><li guid="_2b5f44f6-6837-4126-a4ea-2d542dadda79" id="sec.394-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the relevant environmental authority for the licence.</txt></block></li></list><note guid="_1e2ca89b-7e03-4eed-95a4-392a56ab568c" id="sec.394-ssec.2-note" type="example"><heading guid="_a35924bf-4516-46ec-8d51-92faf1c3da44" id="sec.394-ssec.2-note-he">Note—</heading><block><txt break.before="1">Also, the carrying out of particular activities on particular land in a survey licence’s area may not be authorised following the taking of the land under a resumption law. See <intref check="valid" refid="sec.30AB" target.guid="_4abe0a1b-ba8f-40b0-b76e-1e1864fb56ff">section 30AB</intref>.</txt></block></note></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_7beb0393-3c6c-4ac1-9288-f900b9757cd4" id="ch.4-pt.1-div.2"><no>Division 2</no><heading guid="_f9c41608-caa1-46ee-8bdb-4df1d0ab51b9" id="ch.4-pt.1-div.2-he">Obtaining survey licence</heading><clause affected.by.uncommenced="0" guid="_d5c6bbfb-4cb6-43a8-88f8-bbf9741a4270" id="sec.395" provision.type="other" spent.amends="0"><no>395</no><heading guid="_f792df22-b1d6-4e58-beda-4a8231e5c358" id="sec.395-he">Applying for licence</heading><subclause affected.by.uncommenced="0" guid="_6c9ce8d7-7aa7-466d-b481-5bd3ebc1f57a" id="sec.395-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person may apply for a survey licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7b3dd466-b9f0-40d4-894c-8f509d02b40e" id="sec.395-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bf8c7a4e-019b-46de-82b8-14559a10796e" id="sec.395-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li guid="_8150f3d7-e1b7-4ff0-86ab-fcace857be8a" id="sec.395-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_186fffff-f798-4255-aef7-8a2ef8ed4ddd" id="sec.395-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the type of pipeline or petroleum facility the applicant proposes to construct and operate;</txt></block></li><li guid="_c88bc486-8c3f-41a4-a6d7-899ed775a65e" id="sec.395-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the proposed use of the pipeline or facility;</txt></block></li><li guid="_f997d4c8-39e8-4897-904d-1d5739d34bea" id="sec.395-ssec.2-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">for a proposed pipeline—its terminal points;</txt></block></li><li guid="_6ba0c61e-4cde-4320-8e0a-2f9f65ceb188" id="sec.395-ssec.2-para1.b-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">the period for which the licence is sought;</txt></block></li><li guid="_f0d85d6c-f3ff-41a8-9898-c9dade0f30e6" id="sec.395-ssec.2-para1.b-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">the extent and nature of activities to be carried out under the licence; and</txt></block></li></list></block></li><li guid="_ef0c5cca-53ad-4992-9fa6-de7cc53bf5d2" id="sec.395-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">address the criteria mentioned in <intref check="valid" refid="sec.397" target.guid="_f7c8c758-7330-41cb-bfe6-cb729c6cbbc0">section 397</intref>; and</txt></block></li><li guid="_bb140ecf-f4a8-4e30-a849-e2d6d311b6a1" id="sec.395-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">be accompanied by the fee prescribed under a regulation.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a696ea5f-b54e-40b8-b44a-e3e9087dfbc8" id="sec.396" provision.type="other" spent.amends="0"><no>396</no><heading guid="_ae507179-7ffc-4aea-a03d-fced917833da" id="sec.396-he">Deciding application</heading><subclause affected.by.uncommenced="0" guid="_52b976c9-2dfb-4ddf-9f6f-111e79114f95" id="sec.396-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may decide to grant or refuse the survey licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1b0355dd-26d7-45b3-b56f-f83c8a3d1bf9" id="sec.396-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the licence can not be granted unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9409b1a8-89a3-4665-940d-76a027185184" id="sec.396-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the applicant is an eligible person; and</txt></block></li><li guid="_4a95c9d3-8127-40ec-83b7-9e9a69f3790e" id="sec.396-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a relevant environmental authority for the licence has been issued.</txt></block></li></list><note guid="_b7167ed8-2407-4cf1-b493-22aeaaff6e02" id="sec.396-ssec.2-note" type="example"><heading guid="_fa237800-389c-4bab-9987-1fe0d88816b2" id="sec.396-ssec.2-note-he">Note—</heading><block><txt break.before="1">If the application relates to acquired land, see also <intref check="valid" refid="sec.30AC" target.guid="_9f663574-cdda-4e64-9f8f-6c6102041022">section 30AC</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_69e907cb-6a5c-4c92-8e67-29ba4725c852" id="sec.396-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The licence must state its term and area.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2ea5abf5-a7dc-4c19-aeac-a48afcb25fb5" id="sec.396-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The term must end no later than 2 years after the licence takes effect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ca2944f5-32d5-4804-93ec-e2822ad33a39" id="sec.396-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The licence may also state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8b47683b-bcdc-458f-ab16-7a78defab4dc" id="sec.396-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">conditions or other provisions of the licence not inconsistent with the mandatory conditions for survey licences; or</txt></block></li><li guid="_cce32745-313c-455d-9e19-c39a340c533b" id="sec.396-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a day for the licence to take effect.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a58a1949-130b-43a6-b8e3-785b7af1e9ed" id="sec.396-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">However, the provisions of the licence may exclude or restrict the carrying out of an authorised activity for the licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a4f3d48b-46ab-488b-bc94-0b80156e5299" id="sec.396-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">If no day of effect is decided, the licence takes effect on the day it is granted.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f7c8c758-7330-41cb-bfe6-cb729c6cbbc0" id="sec.397" provision.type="other" spent.amends="0"><no>397</no><heading guid="_01998b84-c05c-4ed7-94c6-359bab633212" id="sec.397-he">Criteria for decisions</heading><block><txt break.before="1">The matters that must be considered in deciding whether to grant a survey licence or deciding its provisions include the applicant’s—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cf7c73d0-bd52-42d1-a148-0a8e1c886d42" id="sec.397-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">financial and technical resources; and</txt></block></li><li guid="_3154e5b2-9d15-4a19-99a7-b3263144dfba" id="sec.397-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">ability to manage a survey to work out the suitability of the area of the licence for the pipeline or petroleum facility the applicant proposes to construct and operate.</txt></block></li></list></block></clause></division></part><part affected.by.uncommenced="0" guid="_e81c6ae8-4e20-4f0d-bb34-255aa2c54d7c" id="ch.4-pt.2"><no>Part 2</no><heading guid="_42d72714-de9e-41f3-954e-ccef02376fea" id="ch.4-pt.2-he">Pipeline licences</heading><note guid="_dccdee53-d344-4174-98db-cf99b4c4e6fe" id="ch.4-pt.2-note" type="example"><heading guid="_b9cc9f64-dc3e-43bc-8e6d-9fd989050d56" id="ch.4-pt.2-note-he">Note—</heading><block><txt break.before="1">For when a pipeline licence is required for a pipeline, see <intref check="valid" refid="sec.802" target.guid="_951fb107-63e2-4a7d-88a5-e195517a9882">section 802</intref>.</txt></block></note><division affected.by.uncommenced="0" guid="_e4c6adef-8574-4039-b481-6ecbfd412d09" id="ch.4-pt.2-div.1"><no>Division 1</no><heading guid="_7b931021-28cc-4cf0-b67c-8d5282e0440c" id="ch.4-pt.2-div.1-he">Key authorised activities</heading><subdivision affected.by.uncommenced="0" guid="_4d89a4c1-f055-4f2b-965f-4f85d8e4829b" id="ch.4-pt.2-div.1-sdiv.1"><no>Subdivision 1</no><heading guid="_ec3a01cf-e0f0-491b-809d-49c47056b3b8" id="ch.4-pt.2-div.1-sdiv.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_2eb40d51-1104-4303-a04e-e8f753eec240" id="sec.398" provision.type="other" spent.amends="0"><no>398</no><heading guid="_435bcdd4-d07c-423f-bf34-3f0825d76d26" id="sec.398-he">Operation of <intref check="valid" refid="ch.4-pt.2-div.1" target.guid="_e4c6adef-8574-4039-b481-6ecbfd412d09">div 1</intref></heading><subclause affected.by.uncommenced="0" guid="_43f6e913-f14a-49d3-a5ec-88c53dd18c0c" id="sec.398-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This division provides for the key authorised activities for a pipeline licence.</txt><note guid="_766afd2c-598d-4322-ae00-060aa3f3a255" id="sec.398-ssec.1-note" type="example"><heading guid="_70b8d012-abc1-4d98-a942-60d803d9abba" id="sec.398-ssec.1-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_ea981daa-d7a2-46eb-a4d3-95820086d744" id="sec.398-ssec.1-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">For other authorised activities, see <intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref>, <intref check="valid" refid="ch.5-pt.8" target.guid="_6fd5c183-bb2d-498f-bceb-5e0aff62d198">part 8</intref> and the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-2014-047" target.guid="_78e7ee55-dcff-4087-b0b9-13497e839af3" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">chapter 3</legref>, <legref check="valid" jurisd="QLD" refid="ch.3-pt.7" target.doc.id="act-2014-047" target.guid="_9e5d29e3-f634-4040-a21c-6073a407f144" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">part 7</legref>.</txt></block></li><li guid="_9fbeab3e-7f9f-4daf-b9bc-62061e2910ea" id="sec.398-ssec.1-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">The carrying out of particular activities on particular land in a pipeline licence’s area may not be authorised following the taking of the land under a resumption law. See <intref check="valid" refid="sec.30AB" target.guid="_4abe0a1b-ba8f-40b0-b76e-1e1864fb56ff">section 30AB</intref>.</txt></block></li></list></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_3f62260f-ffc7-44b5-a45b-e47b1ce54d46" id="sec.398-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The authorised activities may be carried out despite the rights of an owner or occupier of land on which they are exercised.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_66c720ca-3b7d-41ea-bdc7-3c5109ecb273" id="sec.398-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the carrying out of the authorised activities is subject to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4588b994-cbfb-4065-9a19-8aed0f9c2c28" id="sec.398-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0"><intref check="valid" refid="ch.4-pt.2-div.1-sdiv.2" target.guid="_e6536b99-e324-454b-8723-a19eae7b230b">subdivision 2</intref>; and</txt></block></li><li guid="_4901488d-448e-4fa9-9bd8-bc1f89c06882" id="sec.398-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0"><intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref>; and</txt></block></li><li guid="_8506a896-b3d2-4b21-9a72-2b8cfd37b69e" id="sec.398-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the mandatory and other conditions of the licence; and</txt></block></li><li guid="_1461ba4e-e302-4968-96a5-50e7988f5f5d" id="sec.398-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">any exclusion or restriction provided for in the licence on the carrying out of the activities.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7fbe28f5-08ea-4146-a14a-6c09745bc778" id="sec.399" provision.type="other" spent.amends="0"><no>399</no><heading guid="_99dac927-4b6d-4094-98ac-d7c80e638acf" id="sec.399-he">What is <defterm guid="_4dc85827-baa9-4237-9efa-e9a1d19cee12" id="sec.399-def.pipelineland" type="definition">pipeline land</defterm> for a pipeline licence</heading><subclause affected.by.uncommenced="0" guid="_e8be2d68-b12a-4279-90b1-3ec1474c1d1a" id="sec.399-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0"><defterm guid="_05671ef1-9eee-4d19-808f-93b1a02ec83b" id="sec.399-def.Pipelineland" type="definition">Pipeline land</defterm>, for a pipeline licence, is land—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2ca1d2d7-8906-455c-9fdb-d6bc9747e930" id="sec.399-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that the licence holder owns; or</txt></block></li><li guid="_8c3d4fe0-0cca-499f-99c8-4d141e804f8d" id="sec.399-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">over which the holder—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7885995d-db96-4972-80e2-7f808f0d0a3e" id="sec.399-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">holds an appropriate easement for the construction or operation of the pipeline; or</txt></block></li><li guid="_041599c6-61ee-4c33-b28a-d0b0ae832aa4" id="sec.399-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">has obtained the owner’s written permission to enter to construct or operate the pipeline; or</txt></block></li><li guid="_6bd8edf0-1be2-4860-a6e5-81a4c41516d0" id="sec.399-ssec.1-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">holds a <intref check="valid" refid="ch.4-pt.5" target.guid="_eab0c8dc-b6df-485f-877e-6a37095b8990">part 5</intref> permission to enter to construct or operate the pipeline.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5a42185f-f9b0-4bcc-bd99-208c41d1ecd8" id="sec.399-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">To remove any doubt, it is declared that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fb02b749-a60a-49e4-af82-d90384ac9903" id="sec.399-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the granting of a pipeline licence does not, of itself, create an easement for the construction or operation of the pipeline; and</txt></block></li><li guid="_07f4b3f3-ecaf-430c-abf7-7d5f87d844cf" id="sec.399-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the giving of a waiver of entry notice under the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.42" target.doc.id="act-2014-047" target.guid="_18160985-7a04-4b7a-99a5-c89f94db72d2" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">section 42</legref> is not, of itself, a permission for <intref check="valid" refid="sec.399-ssec.1" target.guid="_e8be2d68-b12a-4279-90b1-3ec1474c1d1a">subsection (1)</intref><intref check="valid" refid="sec.399-ssec.1-para1.b" target.guid="_8c3d4fe0-0cca-499f-99c8-4d141e804f8d">(b)</intref><intref check="valid" refid="sec.399-ssec.1-para1.b-para2.ii" target.guid="_041599c6-61ee-4c33-b28a-d0b0ae832aa4">(ii)</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_16fc9e27-3ef5-435c-a992-4c8edb419bc6" id="sec.399-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the Coordinator-General acquires an easement over land for a purpose that includes providing for the construction and operation of a pipeline to transport petroleum, the only owner of the land, for a permission mentioned in <intref check="valid" refid="sec.399-ssec.1" target.guid="_e8be2d68-b12a-4279-90b1-3ec1474c1d1a">subsection (1)</intref><intref check="valid" refid="sec.399-ssec.1-para1.b" target.guid="_8c3d4fe0-0cca-499f-99c8-4d141e804f8d">(b)</intref><intref check="valid" refid="sec.399-ssec.1-para1.b-para2.ii" target.guid="_041599c6-61ee-4c33-b28a-d0b0ae832aa4">(ii)</intref>, is the Coordinator-General.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5648d2e9-bcae-4d1a-8fc0-ba17bce4be60" id="sec.399-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_eeff94c9-2130-4451-b4b3-5f113a4cffd5" id="sec.399-ssec.4-def.acquires_"><txt break.before="1"><defterm guid="_e0da1331-565f-4969-8ebb-38cb285a88df" id="sec.399-ssec.4-def.acquires" type="definition">acquires</defterm> means acquires under the <legref check="valid" jurisd="QLD" target.doc.id="act-1971-055" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" type="act"><name emphasis="no">State Development Act</name></legref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b3742ca8-29bc-4ac1-83a7-f17c6009f7eb" id="sec.399A" provision.type="other" spent.amends="0"><no>399A</no><heading guid="_ab24f5b1-ca00-4cec-bf69-be594d6eb86f" id="sec.399A-he">Written permission binds owner’s successors and assigns</heading><subclause affected.by.uncommenced="0" guid="_bb1f9001-bccf-492b-ab38-02010d10556f" id="sec.399A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a pipeline licence holder obtains the written permission of the owner of land to enter the land to construct and operate a pipeline the subject of the licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_df343891-fba6-48a3-a0b6-68a5c3e2b94e" id="sec.399A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The permission is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b2837c55-2505-4bdc-bfec-33c37a01ac47" id="sec.399A-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for the benefit of anyone who holds the licence from time to time; and</txt></block></li><li guid="_c3b59821-f470-45c5-9866-9f12e8b510a4" id="sec.399A-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">taken to have been given by, and is binding on, each of the owner’s successors and assigns for the land.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3ac1d2ed-e0f2-4a68-b324-b10e846a7842" id="sec.399A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.399A-ssec.2" target.guid="_df343891-fba6-48a3-a0b6-68a5c3e2b94e">subsection (2)</intref><intref check="valid" refid="sec.399A-ssec.2-para1.b" target.guid="_c3b59821-f470-45c5-9866-9f12e8b510a4">(b)</intref> does not apply to a person who is a successor or assignee for the land if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6720e573-816a-4b74-a8e6-8664f542e590" id="sec.399A-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an easement over the land is not registered as mentioned in <intref check="valid" refid="sec.437A" target.guid="_9f2ea47b-bff2-4ec7-9442-c6f5ef2fa5b9">section 437A</intref> within 9 months after the pipeline licence holder gives notice of completion of the pipeline under <intref check="valid" refid="sec.420" target.guid="_812d93ae-f298-4384-b1c8-844c458405d7">section 420</intref>; and</txt></block></li><li guid="_f1fdffe6-bc17-4487-a0fd-8a76c8141390" id="sec.399A-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the person became the owner of the land after the end of the 9 months.</txt></block></li></list></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_e6536b99-e324-454b-8723-a19eae7b230b" id="ch.4-pt.2-div.1-sdiv.2"><no>Subdivision 2</no><heading guid="_47642dcd-2b34-4585-b2e8-eea700ed8cd6" id="ch.4-pt.2-div.1-sdiv.2-he">General restriction on authorised activities</heading><clause affected.by.uncommenced="0" guid="_908050e4-a541-4069-85eb-0436d71a7c9e" id="sec.400" provision.type="other" spent.amends="0"><no>400</no><heading guid="_4d13f10f-e726-48eb-89df-cdac3ed797e4" id="sec.400-he">Restriction if there is an existing geothermal, GHG or mining lease</heading><subclause affected.by.uncommenced="0" change="insStruct" guid="_bc1cd7cb-dee0-4b31-b940-e8334ff47cfe" id="sec.400-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0"><del xml:space="preserve">If</del><ins xml:space="preserve">This section applies if</ins> land in the area of a pipeline licence is also in the area of a geothermal lease, GHG lease or mining lease <del xml:space="preserve">and the lease</del><ins xml:space="preserve">(each an <defterm guid="_20f85e78-d20b-4ce1-865b-076353bfbbb8" id="sec.400-def.existinglease" type="definition">existing lease</defterm>) that</ins> was granted before the licence<del xml:space="preserve">, an authorised activity for the licence may be carried out on the land only if—</del><ins xml:space="preserve">.</ins></txt><list number.type="manual" unnumbered.indent="0"><li change="del" guid="_477632ae-ba52-445a-a070-f3913bc3fd2a-del" id="sec.400-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">the lease holder has agreed in writing to the carrying out of the activity; and</txt></block></li><li change="del" guid="_89d9a1be-0e76-4d0a-8ca3-dcf97293a868-del" id="sec.400-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">a copy of the agreement has been lodged; and</txt></block></li><li change="del" guid="_e3b6da20-f077-489f-9b81-30033be20cc7-del" id="sec.400-para1.c-del" provision.type="other"><no>(c)</no><block><txt break.before="0">the agreement is still in force.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" change="ins" guid="_dee0fc9f-f0e6-4ccb-8fab-eac8c7cba268" id="sec.400-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The pipeline licence holder may carry out an authorised activity for the licence on land within the area of the existing lease only if— </txt><list number.type="manual" unnumbered.indent="0"><li guid="_8a139ac3-daa5-496d-a78c-c14c2e04324b" id="sec.400-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">both of the following apply—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7dca8cb4-cd31-4af6-88af-2a5c1bb39e70" id="sec.400-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the existing lease holder has agreed in writing to the carrying out of the activity; </txt></block></li><li guid="_f41975a4-993c-459a-996a-55521a144207" id="sec.400-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the pipeline licence holder has given a copy of the agreement mentioned in subparagraph (i) to the chief executive; or </txt></block></li></list></block></li><li guid="_793b7fd7-c499-4363-97d5-b70c8658542f" id="sec.400-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">both of the following apply—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_086da1e9-5410-443d-9b73-464fff47545b" id="sec.400-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">carrying out the activity is consistent with an agreed co-existence plan; </txt></block></li><li guid="_502b0f5d-770b-4dbd-9fc8-cb2d366f384d" id="sec.400-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the pipeline licence holder has given a notice to the chief executive stating the following— </txt><list number.type="manual" unnumbered.indent="0"><li guid="_9f2ec703-6cef-452e-afd8-2554b13160bd" id="sec.400-ssec.2-para1.b-para2.ii-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">that the plan is in place;</txt></block></li><li guid="_dc4c8bdc-b51b-4127-b48e-c17c2c35c26c" id="sec.400-ssec.2-para1.b-para2.ii-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">the period for which the plan has effect;</txt></block></li><li guid="_8d9b39f6-0bff-4e5e-85e1-4710aff4b368" id="sec.400-ssec.2-para1.b-para2.ii-para3.C" provision.type="other"><no>(C)</no><block><txt break.before="0">other information prescribed by regulation.</txt></block></li></list></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" change="ins" guid="_ec8c6078-b3a1-44ca-8950-cb13d3252494" id="sec.400-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">An agreed co-existence plan must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_59af8b2c-ccd6-498d-beb3-77737fdd2dd9" id="sec.400-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">identify the parties to the plan; and</txt></block></li><li guid="_22e6d82d-8395-4a2e-8bd2-a1e6effb5ea0" id="sec.400-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">set out an overview of the activities proposed to be carried out in the area mentioned in subsection (1), including the location of the activities and when they will start; and</txt></block></li><li guid="_3e91637a-d100-4238-82f9-cb471966f3b7" id="sec.400-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">set out how the activities mentioned in paragraph (b) will comply with mining safety legislation; and</txt></block></li><li guid="_41733365-0df1-4e7b-a249-d65a09ed13e5" id="sec.400-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">state how the activities mentioned in paragraph (b) optimise the development and use of the State’s resources; and</txt></block></li><li guid="_081a685a-970b-4e37-96fb-362c5c714668" id="sec.400-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">state whether any monetary or non-monetary compensation is to be given under the plan; and</txt></block></li><li guid="_5d961867-01d5-4bc7-8407-79b299f0b2e2" id="sec.400-ssec.3-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">state the period for which the plan is to have effect; and</txt></block></li><li guid="_c64f5dc6-2fc0-4639-9f1d-4f06e5520a30" id="sec.400-ssec.3-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">include any other information prescribed by regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" change="ins" guid="_d58bb7c6-f208-4945-96c9-a563cc2ef68b" id="sec.400-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The pipeline licence holder may give the existing lease holder a notice (the <defterm guid="_4e140a75-448f-4314-88ee-f6b2c295fc37" id="sec.400-def.negotiationnotice" type="definition">negotiation notice</defterm>) that the pipeline licence holder wishes to negotiate a co-existence plan with the existing lease holder.</txt></block></subclause><subclause affected.by.uncommenced="0" change="ins" guid="_04ebf285-cfe0-46aa-892d-4cf7aa2938b4" id="sec.400-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The negotiation notice is invalid if it does not comply with the prescribed requirements for the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" change="ins" guid="_4e9b4a5f-fee6-4d74-9f75-7bab1466c520" id="sec.400-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The pipeline licence holder and the existing lease holder must negotiate in good faith and use all reasonable endeavours to agree on a co-existence plan.</txt></block></subclause><subclause affected.by.uncommenced="0" change="ins" guid="_82bcc2d2-2076-4679-ade2-555bd4b86505" id="sec.400-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">If the pipeline licence holder and the existing lease holder can not agree on a co-existence plan within 3 months after the giving of the negotiation notice, the pipeline licence holder may apply for arbitration of the dispute.</txt></block></subclause><subclause affected.by.uncommenced="0" change="ins" guid="_35066350-04b3-4c83-bdbe-cf5d42d84525" id="sec.400-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">Despite subsection (7), the pipeline licence holder and the existing lease holder may jointly apply for arbitration of the dispute at any time.</txt></block></subclause><subclause affected.by.uncommenced="0" change="ins" guid="_ad9f377b-623d-445a-9d20-938144ba17df" id="sec.400-ssec.9" provision.type="other"><no>(9)</no><block><txt break.before="0">It is a condition of both the pipeline licence and the existing lease that the holder must comply with each agreed co-existence plan that applies to the holder.</txt></block></subclause><subclause affected.by.uncommenced="0" change="ins" guid="_92e39f29-4b2e-4c5f-bfcb-a0954958f260" id="sec.400-ssec.10" provision.type="other"><no>(10)</no><block><txt break.before="0">In this section—</txt><definition affected.by.uncommenced="0" guid="_f5d0d17c-70e5-4e11-845f-6ed9ea55e1de" id="sec.400-ssec.10-def.agreedcoexistenceplan_"><txt break.before="1"><defterm guid="_b59aeb09-b71d-42d9-ad68-e6ba720e32c0" id="sec.400-ssec.10-def.agreedcoexistenceplan" type="definition">agreed co-existence plan</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9b3fa262-532e-47f7-901f-7d646d280459" id="sec.400-ssec.10-def.agreedcoexistenceplan-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if an agreed co-existence plan is agreed on under subsection (6)—the agreed co-existence plan; or</txt></block></li><li guid="_f4760c23-f10e-4f8f-ba05-28a75bdf02e2" id="sec.400-ssec.10-def.agreedcoexistenceplan-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if an agreed co-existence plan is amended by the holders of the pipeline licence and the existing mining lease—the agreed co-existence plan as amended; or</txt></block></li><li guid="_76725f79-4555-427f-9a37-5674cfd3ab8a" id="sec.400-ssec.10-def.agreedcoexistenceplan-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if an agreed co-existence plan is arbitrated as an agreed co-existence plan under the Common Provisions Act, chapter 5, part 3—the agreed co-existence plan as arbitrated.</txt></block></li></list></definition></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_a2476a02-0788-4358-a08b-a6c9111b591c" id="ch.4-pt.2-div.1-sdiv.3"><no>Subdivision 3</no><heading guid="_d7065bc8-3d89-42be-844a-645d12fd39bf" id="ch.4-pt.2-div.1-sdiv.3-he">Pipeline construction and operation</heading><clause affected.by.uncommenced="0" guid="_0741738d-27f0-4420-91c6-dfbec69fdbe6" id="sec.401" provision.type="other" spent.amends="0"><no>401</no><heading guid="_2832a323-7aeb-491d-b290-363633e188c8" id="sec.401-he">Construction and operation of pipeline</heading><subclause affected.by.uncommenced="0" guid="_edd51f68-d6b4-4597-9865-a73e02cc16e8" id="sec.401-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The holder of a pipeline licence may construct or operate each pipeline the subject of the licence on—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_419c8705-8201-4719-913f-e382adaf4f38" id="sec.401-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">pipeline land for the licence; and</txt></block></li><li guid="_9730d99e-1dc2-44ff-9fbd-aa7e39ccd375" id="sec.401-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">subject to <intref check="valid" refid="ch.4-pt.2-div.6" target.guid="_25ed81fb-6eda-4bcc-ad08-6c2337a059fc">division 6</intref>, public land in the area of the licence.</txt></block></li></list><note guid="_e5f22a01-a813-4996-9f7e-c6a96d274f79" id="sec.401-ssec.1-note" type="example"><heading guid="_712aa91a-620a-41e0-bb57-55cdd1df02c7" id="sec.401-ssec.1-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_82c17ef4-8fd0-40c8-8f0f-480089adab36" id="sec.401-ssec.1-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">See also <intref check="valid" refid="sec.802" target.guid="_951fb107-63e2-4a7d-88a5-e195517a9882">section 802</intref> (Restriction on pipeline construction or operation).</txt></block></li><li guid="_08c08eec-9bff-4470-93be-9a31a7206115" id="sec.401-ssec.1-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">For who may exercise the rights for the holder, see <intref check="valid" refid="sec.563" target.guid="_67d472c3-9467-468b-8bb0-c21101321b5e">section 563</intref>.</txt></block></li><li guid="_0834556d-0385-4bed-a291-6fcac26a5f29" id="sec.401-ssec.1-note-para1.3" provision.type="other"><no>3</no><block><txt break.before="0">For who owns the pipeline, see <intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref>, <intref check="valid" refid="ch.5-pt.6" target.guid="_c721e194-2c03-434e-a600-562893f05843">part 6</intref>.</txt></block></li></list></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_efec05ed-06f9-4237-82a4-ca43b77abc90" id="sec.401-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if native title exists in relation to land mentioned in <intref check="valid" refid="sec.401-ssec.1" target.guid="_edd51f68-d6b4-4597-9865-a73e02cc16e8">subsection (1)</intref>, the holder must have or hold an interest or permission mentioned in <intref check="valid" refid="sec.399" target.guid="_7fbe28f5-08ea-4146-a14a-6c09745bc778">section 399</intref><intref check="valid" refid="sec.399-ssec.1" target.guid="_e8be2d68-b12a-4279-90b1-3ec1474c1d1a">(1)</intref><intref check="valid" refid="sec.399-ssec.1-para1.b" target.guid="_8c3d4fe0-0cca-499f-99c8-4d141e804f8d">(b)</intref> for the native title rights and interests.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_757f0136-6656-425f-b52e-e82db82a51e5" id="sec.401-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">To remove any doubt, it is declared that the mere grant of the licence does not, of itself, authorise—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3d160250-7930-41f1-a130-ce6a26ad8125" id="sec.401-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the construction or operation of a pipeline on other land in the area of the licence; or</txt></block></li><li guid="_2a7ce62b-ee79-4011-a09c-7a883a86aef4" id="sec.401-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">taking, interfering with or using produced water.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_162af7e9-4ec5-415a-92d5-f4bf364cfe65" id="sec.402" provision.type="other" spent.amends="0"><no>402</no><heading guid="_89aefb64-eefb-4c93-8307-9ced2a0d9127" id="sec.402-he">Licence may extend transportation right to other prescribed substances</heading><subclause affected.by.uncommenced="0" guid="_2975a610-76ee-4690-adbd-a6ad8c63dce8" id="sec.402-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A condition of a pipeline licence may extend its holder’s right under <intref check="valid" refid="sec.401" target.guid="_0741738d-27f0-4420-91c6-dfbec69fdbe6">section 401</intref> to operate any pipeline in the area of the licence to include the transportation of either of the following substances—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cf14c7d7-f621-49cb-b4f9-d102989331f5" id="sec.402-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a GHG stream;</txt></block></li><li guid="_7fb837d5-3585-473b-aa6c-6b35f0db69ac" id="sec.402-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a substance prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7839ba36-91de-4483-af06-5e406d8b194c" id="sec.402-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, a substance may be prescribed only if it is similar to petroleum and is suitable for transportation by the pipeline.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ac9b769b-7a8d-4a6a-a76b-c5ec8782c2b8" id="sec.402-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The condition may impose restrictions on the extended right.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_31221de2-cdfc-4596-80c1-d25e92caaa7a" id="sec.403" provision.type="other" spent.amends="0"><no>403</no><heading guid="_febd574a-ae5c-4dd6-b5f2-f75945b2c1c5" id="sec.403-he">Incidental activities</heading><subclause affected.by.uncommenced="0" guid="_e7571858-d49b-43aa-8528-a3b36afb861a" id="sec.403-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, under <intref check="valid" refid="sec.401" target.guid="_0741738d-27f0-4420-91c6-dfbec69fdbe6">section 401</intref>, a pipeline licence holder has the right to construct or operate a pipeline.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7375e80f-33ea-4834-93c7-e0f80b348ea7" id="sec.403-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The holder may carry out an activity (an <defterm guid="_e902ba7e-f213-412c-9ee1-217a98be9a69" id="sec.403-def.incidentalactivity" type="definition">incidental activity</defterm>) in the area of the licence if carrying out the activity is reasonably necessary for the construction or operation.</txt><note guid="_0e6dde0f-b911-4592-b506-4cd462f2a68b" id="sec.403-ssec.2-note" type="example"><heading guid="_7c786ad8-c5d0-4c62-863b-588c1c89af2e" id="sec.403-ssec.2-note-he">Examples of incidental activities—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_9d06dcdb-9305-4c1c-8a81-7799d7ddcfeb" id="sec.403-ssec.2-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">constructing or operating plant or works, including, for example, bridges, powerlines, roads, trenches and tunnels</txt></block></li><li guid="_bb1f1cce-946f-4f85-b04e-e182a9d7945f" id="sec.403-ssec.2-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">constructing or using temporary structures or structures of an industrial or technical nature, including, for example, mobile and temporary camps</txt></block></li><li guid="_7bc00dbb-6501-4a48-b42f-057b40970efd" id="sec.403-ssec.2-note-para1.3" provision.type="other"><no>3</no><block><txt break.before="0">removing vegetation for, or for the safety of, the pipeline construction or operation</txt></block></li></list></block></note><note guid="_28d1585a-eade-47ba-9531-bb9618feb3a7" id="sec.403-ssec.2-note-oc.2" type="example"><heading guid="_f5a908fc-5de9-433d-a9e7-342fccf85d7a" id="sec.403-ssec.2-note-oc.2-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref> (Common petroleum authority provisions) and <intref check="valid" refid="sec.20" target.guid="_746e989f-44f2-4d9b-9550-13495b74b131">section 20</intref> (What are the <defterm guid="_79021ee9-3069-4aab-b162-e5ce34f5f41c" type="mention">conditions</defterm> of a petroleum authority).</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_648ad43c-2170-458d-b22d-e6561c10117b" id="sec.403-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, the holder may carry out an activity (a <defterm guid="_488d7ae3-55c2-429e-935a-5a986c4a6f0f" id="sec.403-def.statedpipelinelicenceincidentalactivity" type="definition">stated pipeline licence incidental activity</defterm>) in the area of the licence if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b7190b45-fdef-4488-8ccf-3ca68e4c197f" id="sec.403-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the activity is carried out on pipeline land concurrently with the construction or operation; and</txt></block></li><li guid="_fd59f660-cd3b-475c-b151-c3fd7d52a85d" id="sec.403-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the activity is stated on the licence to be an incidental activity for this subsection that the holder of the licence is entitled to carry out under the licence; and</txt></block></li><li guid="_7d11b197-66a4-4ffd-b113-f15fc2da839a" id="sec.403-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the carrying out of the activity is reasonably necessary for, or incidental to, carrying out an authorised activity for a petroleum lease, a petroleum facility licence or another pipeline licence.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_fdae72e1-b211-43db-9a43-ee5960414852" id="sec.403-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, constructing or using a structure, other than a temporary structure, for office or residential accommodation is not an incidental activity or a stated pipeline licence incidental activity.</txt><note guid="_7f459d09-5603-49bb-891d-e5e0e87d4852" id="sec.403-ssec.4-note" type="example"><heading guid="_060e690f-f1de-41a0-8f32-c9f37841773b" id="sec.403-ssec.4-note-he">Note—</heading><block><txt break.before="1">For development generally, see the <legref check="valid" jurisd="QLD" target.doc.id="act-2016-025" target.version.series="d4a7e9d3-f73d-48a3-9459-9be0b66a1c15" type="act"><name emphasis="yes">Planning Act 2016</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-2016-025" target.guid="_42229283-823c-4a26-99f7-756eab8a5578" target.version.series="d4a7e9d3-f73d-48a3-9459-9be0b66a1c15" type="act">chapter 3</legref>.</txt></block></note></block></subclause></clause></subdivision></division><division affected.by.uncommenced="0" guid="_7e233799-3468-4a91-897c-11b9f469f153" id="ch.4-pt.2-div.2"><no>Division 2</no><heading guid="_5ad4986c-7106-4225-9a7a-6abf6e594787" id="ch.4-pt.2-div.2-he">Availability of pipeline licences</heading><clause affected.by.uncommenced="0" guid="_851fee35-9607-48d6-8329-f130f2f824f1" id="sec.404" provision.type="other" spent.amends="0"><no>404</no><heading guid="_76228cf8-df33-4a41-b1c0-2570be1ac6b4" id="sec.404-he">Licence types—area or point to point</heading><block><txt break.before="1">A pipeline licence may be granted—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f28d8e21-07d2-4007-9f8d-3b6873835a20" id="sec.404-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">over a stated area (an <defterm guid="_7b09e6d5-9c3a-416e-aad3-f1216a88d37e" id="sec.404-def.areapipelinelicence" type="definition">area pipeline licence</defterm>); or</txt></block></li><li guid="_089a4609-5db2-4d52-b84d-363a01e502d7" id="sec.404-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for a pipeline from one stated point or points to another point or points (a <defterm guid="_8dfd5f35-5986-422e-a70f-f508b2b1fffc" id="sec.404-def.pointtopointpipelinelicence" type="definition">point-to-point pipeline licence</defterm>).</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_4db1cd9e-b30e-4372-b56d-a3f12fe97f40" id="sec.405" provision.type="other" spent.amends="0"><no>405</no><heading guid="_dfda8853-5e24-4b02-8cb1-f405c4edc61f" id="sec.405-he">Pipeline licence can not be granted for distribution pipeline</heading><block><txt break.before="1">A pipeline licence under this Act can not be granted for a distribution pipeline.</txt></block></clause><clause affected.by.uncommenced="0" guid="_384cf04d-f03b-462e-ad33-36ea48bffd1f" id="sec.406" provision.type="other" spent.amends="0"><no>406</no><heading guid="_dcb91ae8-9072-4e66-b3d7-d2058d947503" id="sec.406-he">Pipeline licence may be granted over any land</heading><block><txt break.before="1">A pipeline licence may be granted over any land, including land in the area of another petroleum authority.</txt></block></clause></division><division affected.by.uncommenced="0" guid="_4de73ec2-ffc3-4b61-b67e-55ab7ae8e208" id="ch.4-pt.2-div.3"><no>Division 3</no><heading guid="_98ae5d80-0d6a-45e4-a421-afdb44a7119b" id="ch.4-pt.2-div.3-he">Obtaining pipeline licence</heading><subdivision affected.by.uncommenced="0" guid="_4846f49e-a8d7-45c6-b33a-6e7f7ac0d2c1" id="ch.4-pt.2-div.3-sdiv.1"><no>Subdivision 1</no><heading guid="_7b263793-b682-41d3-98f9-471464708524" id="ch.4-pt.2-div.3-sdiv.1-he">Applying for pipeline licence</heading><clause affected.by.uncommenced="0" guid="_b840db58-e26a-4627-9bd7-2c38f9023736" id="sec.407" provision.type="other" spent.amends="0"><no>407</no><heading guid="_f81d4fbb-0e33-4575-aad1-cfdb101c6502" id="sec.407-he">Who may apply and multiple licence applications</heading><subclause affected.by.uncommenced="0" guid="_4ec38fd6-dc52-422a-ac41-19dfd6af7132" id="sec.407-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person may apply for a pipeline licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_dfa44854-ebf3-4ac8-aa84-a49ef4d4d92c" id="sec.407-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, a person can not, in the same application, apply for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_14d08fc2-2f80-4d84-a1c8-9209876dedbb" id="sec.407-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a point-to-point pipeline licence for more than 1 point-to-point pipeline; or</txt></block></li><li guid="_7aa900a7-2eef-4e75-887d-7dd53513a1cc" id="sec.407-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an area pipeline licence for more than 1 area; or</txt></block></li><li guid="_fee9623c-94f9-4ab2-ad72-3fccd2108aa3" id="sec.407-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a point-to-point pipeline licence and an area pipeline licence.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8eccd3e2-0184-4639-b7ac-4ad7578a3735" id="sec.409" provision.type="other" spent.amends="0"><no>409</no><heading guid="_55da7527-e1ca-4ca6-b7bf-0abb436ee490" id="sec.409-he">Requirements for making application</heading><block><txt break.before="1">The application must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1b53c9da-30d0-4107-9ebd-72d5e5cadbd2" id="sec.409-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li guid="_ce2ce625-3d14-42ff-9676-b8d52f332898" id="sec.409-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state each of the following (the <defterm guid="_60407ef7-7fbe-4113-abec-21f974f7f534" id="sec.409-def.applicationdetails" type="definition">application details</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0993213a-cec6-401a-93c3-d92bb2be4d3a" id="sec.409-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a description of the land in the area of the licence;</txt></block></li><li guid="_f4657851-4ea0-4cc3-ae4c-356993f9e193" id="sec.409-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the type and purpose of each pipeline to be the subject of the licence and each substance proposed to be transported through it;</txt></block></li><li guid="_be1c718f-43b9-4e50-b5b3-8fa571aaf057" id="sec.409-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">for a point-to-point pipeline licence—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_165ee4e1-ba43-40eb-90e9-c55bf5d8d5db" id="sec.409-para1.b-para2.iii-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">the pipeline’s terminal points; and</txt></block></li><li guid="_6380343a-2c72-4b0e-b5b5-972a7876199b" id="sec.409-para1.b-para2.iii-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">if the pipeline has not already been constructed—a proposed day for the completion of the construction of the pipeline;</txt></block></li></list></block></li><li guid="_3d175e69-2dd5-4d80-b41e-ee57a041300a" id="sec.409-para1.b-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">for an area pipeline licence other than to the extent the application is for existing pipelines—a proposed day for the completion of the construction of each initial pipeline mentioned in the licence;</txt></block></li><li guid="_d4daaa82-db9f-473c-88f7-c3be469603e1" id="sec.409-para1.b-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">the extent and nature of activities proposed to be carried out under the licence, including, for example, the extent and nature of any proposed stated pipeline licence incidental activity for the licence; and</txt></block></li></list></block></li><li guid="_dfd285a7-2101-4431-a4f2-31384d596979" id="sec.409-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the area of the licence is, or is included in, the area of another petroleum authority or a mining interest—identify possible impacts of authorised activities under the licence on authorised activities under the other petroleum authority or on mining under the mining interest; and</txt></block></li><li guid="_66c5d297-64d7-4aec-931e-e12b55102015" id="sec.409-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">address the criteria mentioned in <intref check="valid" refid="sec.415" target.guid="_ae02bb65-9f89-4ead-917c-ce9e43a0d081">section 415</intref><intref check="valid" refid="sec.415-ssec.1" target.guid="_2d4465e5-75b3-47dc-8bf2-dc0315f7bc54">(1)</intref><intref check="valid" refid="sec.415-ssec.1-para1.a" target.guid="_0ce8f4e7-b714-41ea-8302-66f7c396646e">(a)</intref>; and</txt></block></li><li guid="_4ad3b0fb-793a-4c64-8f05-d88ca1183063" id="sec.409-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">if the activities to be carried out under the pipeline licence include any proposed stated pipeline licence incidental activity—address the criteria mentioned in <intref check="valid" refid="sec.415" target.guid="_ae02bb65-9f89-4ead-917c-ce9e43a0d081">section 415</intref><intref check="valid" refid="sec.415-ssec.2" target.guid="_26a0854d-ad96-44d8-9fef-50e6c6f179f7">(2)</intref>; and</txt></block></li><li guid="_d5843572-530d-4d04-b788-858a5b3023b5" id="sec.409-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">be accompanied by the fee prescribed under a regulation.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_7da6d7a3-3d61-43ef-8c9e-31166652d766" id="sec.409A" provision.type="other" spent.amends="0"><no>409A</no><heading guid="_c5449d00-16bf-4caf-91fb-e86eaf5f178a" id="sec.409A-he">Notice of application to relevant local government</heading><subclause affected.by.uncommenced="0" guid="_f79d40ec-c052-4253-9554-54a2e9e56875" id="sec.409A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section does not apply if the application is for an existing pipeline.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_81fdcdf8-ca00-4e42-b8da-8e501433d02e" id="sec.409A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The applicant must, within 10 business days after making the application, give each relevant local government a notice stating the application details under <intref check="valid" refid="sec.409" target.guid="_8eccd3e2-0184-4639-b7ac-4ad7578a3735">section 409</intref><intref check="valid" refid="sec.409-para1.b" target.guid="_ce2ce625-3d14-42ff-9676-b8d52f332898">(b)</intref> for the proposed application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9b87a09b-1f06-4264-b1c3-d24134117f88" id="sec.409A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If <intref check="valid" refid="sec.409A-ssec.2" target.guid="_81fdcdf8-ca00-4e42-b8da-8e501433d02e">subsection (2)</intref> is not complied with, the application lapses.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_de411d71-9e1e-4376-bc20-f83f3e7b110a" id="sec.409A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">To remove any doubt, it is declared that the lapsing of the application under <intref check="valid" refid="sec.409A-ssec.3" target.guid="_9b87a09b-1f06-4264-b1c3-d24134117f88">subsection (3)</intref> does not of itself prevent the former applicant making another pipeline licence application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_72d86930-657b-4f78-ba84-6e27a2ed35ae" id="sec.409A-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_952fee7a-ff12-4e5c-9be4-d99eaa7fc748" id="sec.409A-ssec.5-def.relevantlocalgovernment_"><txt break.before="1"><defterm guid="_b554d617-ed62-4f12-8e2e-c3fb847109db" id="sec.409A-ssec.5-def.relevantlocalgovernment" type="definition">relevant local government</defterm> means a local government in whose local government area pipelines are proposed to be constructed under the licence.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_ddd7acca-22ef-4795-baa3-4d9472df06c2" id="sec.409B" provision.type="other" spent.amends="0"><no>409B </no><heading guid="_a24883b5-0e4f-4940-8e20-6a141952f4ce" id="sec.409B-he">Rejection of application if applicant disqualified</heading><subclause affected.by.uncommenced="0" guid="_9c44403a-9320-4de8-8aac-b7e71571a074" id="sec.409B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister must reject an application for a pipeline licence if the Minister decides the applicant is disqualified under the Common Provisions Act, chapter 7 from being granted the pipeline licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_deb768ff-d131-4b99-ba46-8ea93747255d" id="sec.409B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On rejection of the application, the Minister must give the applicant a notice about the decision.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_9911f5e9-f0db-4e47-9673-2271790a00d5" id="ch.4-pt.2-div.3-sdiv.2"><no>Subdivision 2</no><heading guid="_8f0379cb-717f-43a1-8e2a-a95e19ec46ab" id="ch.4-pt.2-div.3-sdiv.2-he">Deciding pipeline licence application</heading><clause affected.by.uncommenced="0" guid="_0c4d0b54-5164-4da0-ad81-1b542deba6b9" id="sec.410" provision.type="other" spent.amends="0"><no>410</no><heading guid="_ce1690de-1014-4da2-9001-14598ff72fa5" id="sec.410-he">Deciding whether to grant licence</heading><subclause affected.by.uncommenced="0" guid="_5c321b40-467d-4acc-8669-6c655a9d0979" id="sec.410-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_241ec968-616b-4f26-b40a-80af887f554f" id="sec.410-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">subject to <intref check="valid" refid="sec.411" target.guid="_a3c6e7f2-b35d-4f19-885f-41d1f5879fe5">sections 411</intref> and <intref check="valid" refid="sec.412A" target.guid="_5237f0a2-dee2-44a2-9f3d-9058b798ccb3">412A</intref>, grant the applicant a pipeline licence only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f3ca1e18-af5d-427d-a10c-8a4421c1e240" id="sec.410-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the applicant is an eligible person; and</txt></block></li><li guid="_0afa9660-1fa9-42d1-b846-250f97abaea1" id="sec.410-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a relevant environmental authority for the licence has been issued; and</txt></block></li></list></block></li><li guid="_5a792c33-a2a8-40af-aa1d-d823647bdca0" id="sec.410-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">before granting the licence, require the applicant to do all or any of the following within a stated reasonable period—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_274c3dfc-5998-44a7-9aba-37936baa76d8" id="sec.410-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">pay the licence fee for the first year of the proposed licence;</txt></block></li><li guid="_102ea0ab-da83-4784-bf28-5aed06104de0" id="sec.410-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">give, under <intref check="valid" refid="sec.488" target.guid="_13f8de44-15a4-4a47-a9af-6464bc374dda">section 488</intref>, security for the licence.</txt></block></li></list></block></li></list><note guid="_7727b82e-eb9a-40f4-ae3f-c00c2c9751a1" id="sec.410-ssec.1-note" type="example"><heading guid="_ed7b71f7-0959-43f3-9f3a-901bcae0c9ed" id="sec.410-ssec.1-note-he">Note—</heading><block><txt break.before="1">If the application relates to acquired land, see also <intref check="valid" refid="sec.30AC" target.guid="_9f663574-cdda-4e64-9f8f-6c6102041022">section 30AC</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_b01848ce-0288-4e18-9eea-56ea0bdb7bbe" id="sec.410-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the applicant does not comply with a requirement under <intref check="valid" refid="sec.410-ssec.1" target.guid="_5c321b40-467d-4acc-8669-6c655a9d0979">subsection (1)</intref>, the Minister may refuse to grant the licence.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a3c6e7f2-b35d-4f19-885f-41d1f5879fe5" id="sec.411" provision.type="other" spent.amends="0"><no>411</no><heading guid="_37c65cbb-7524-43f8-983e-63c049eb5e2f" id="sec.411-he">Public notice requirement</heading><subclause affected.by.uncommenced="0" guid="_0282a06e-600b-498a-a918-0c6cf4ed50c7" id="sec.411-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister must not grant the applicant a pipeline licence unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bbcea2bd-db81-42f8-a209-82646787e6e3" id="sec.411-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the notice complying with <intref check="valid" refid="sec.411-ssec.2" target.guid="_7abf8463-a111-43c1-a524-807bd14e67d1">subsection (2)</intref><intref check="valid" refid="sec.411-ssec.2-para1.a" target.guid="_49c1f022-38c2-470a-be3b-90d029ecbc51">(a)</intref> has been published as required under <intref check="valid" refid="sec.411-ssec.2" target.guid="_7abf8463-a111-43c1-a524-807bd14e67d1">subsection (2)</intref><intref check="valid" refid="sec.411-ssec.2-para1.b" target.guid="_7ce7ff99-2cd1-4bca-a58e-c44b3a7522dd">(b)</intref>; and</txt></block></li><li guid="_976c1e1f-85de-480d-89a7-6e70bae592bf" id="sec.411-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the applicant has given the chief executive evidence of the publication; and</txt></block></li><li guid="_00b2e475-1147-4661-978b-011d566a4909" id="sec.411-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the Minister has considered any submissions in response to the notice lodged within the period stated in the notice.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7abf8463-a111-43c1-a524-807bd14e67d1" id="sec.411-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.411-ssec.1" target.guid="_0282a06e-600b-498a-a918-0c6cf4ed50c7">subsection (1)</intref><intref check="valid" refid="sec.411-ssec.1-para1.a" target.guid="_bbcea2bd-db81-42f8-a209-82646787e6e3">(a)</intref>, the notice must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_49c1f022-38c2-470a-be3b-90d029ecbc51" id="sec.411-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">state each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_46569d23-804c-4645-ae90-1cd37395b5b4" id="sec.411-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">that a pipeline licence application has been made;</txt></block></li><li guid="_dfbd2a51-bb70-4683-b647-cb9867851ca7" id="sec.411-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the applicant’s name;</txt></block></li><li guid="_814da9ef-b685-40b5-985b-d2177c140763" id="sec.411-ssec.2-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the area proposed for the licence;</txt></block></li><li guid="_82dceba0-f2cd-4248-8d04-aed2df194f6b" id="sec.411-ssec.2-para1.a-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">where further details about the application can be obtained;</txt></block></li><li guid="_391d22c6-379a-4a06-8021-8c9847eabacb" id="sec.411-ssec.2-para1.a-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">a period of at least 30 business days during which anyone may lodge submissions about the application;</txt></block></li><li guid="_3e765fb7-e6a3-492b-91bc-052d96f0d54f" id="sec.411-ssec.2-para1.a-para2.vi" provision.type="other"><no>(vi)</no><block><txt break.before="0">where submissions must be lodged; and</txt></block></li></list></block></li><li guid="_7ce7ff99-2cd1-4bca-a58e-c44b3a7522dd" id="sec.411-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">be published in a newspaper circulating throughout the State or, if the proposed licence is an area pipeline licence, generally in the area.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9e64a7e2-34d6-4384-bf06-5435070017a7" id="sec.411-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The applicant must bear the costs of the publication.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_4254ee96-45e5-4851-882e-f6dbec58a009" id="sec.412" provision.type="other" spent.amends="0"><no>412</no><heading guid="_6cdef5df-44ba-447a-b2be-f27386029c2f" id="sec.412-he">Provisions of licence</heading><subclause affected.by.uncommenced="0" guid="_c992a7b0-e79f-49e7-9266-43132c358ee7" id="sec.412-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Each pipeline licence must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_eb8f715b-5f9f-4219-94c1-edad8284895e" id="sec.412-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">its term and area; and</txt><note guid="_3b6b88c5-a52c-433b-875b-29fd0edd760c" id="sec.412-ssec.1-para1.a-note" type="example"><heading guid="_279e1b5c-46cf-472c-9fae-a283c9fd29ba" id="sec.412-ssec.1-para1.a-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.414" target.guid="_7d0750f7-925f-4d23-a248-020d9c000c30">section 414</intref> (Provision for reduction of area of licence).</txt></block></note></block></li><li guid="_d2db7aca-2536-4e29-9642-c00698f8c451" id="sec.412-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for a point-to-point pipeline licence—the day for completion of the construction of the pipeline, if it has not already been constructed; and</txt></block></li><li guid="_e166c08f-fa86-4ec5-8097-49ad68e91c3f" id="sec.412-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">for an area pipeline licence—the day for completion of the construction of each initial pipeline to be the subject of the licence, if they have not already been constructed; and</txt></block></li><li guid="_11eef621-e846-410d-89f0-db066b02e883" id="sec.412-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">for a pipeline licence under which a stated pipeline licence incidental activity may be carried out—the stated pipeline licence incidental activities that the holder of the licence is entitled to carry out under the licence.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d36edc7e-f1f6-47a7-bb33-b89fc33c8daa" id="sec.412-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.413" target.guid="_da43b0ac-1bce-4941-9aa8-6e978b5b7b54">section 413</intref>, the licence may also state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f032a22b-1b5a-4efe-b87b-8ca97226fca0" id="sec.412-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">conditions or other provisions of the licence, other than conditions or provisions that are—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a9c00109-1736-4c2d-bd1d-ad58b9a92002" id="sec.412-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">inconsistent with the mandatory conditions for pipeline licences; or</txt><note guid="_5508976f-eb8b-490a-90b1-6a359105705a" id="sec.412-ssec.2-para1.a-para2.i-note" type="example"><heading guid="_b7657d28-7fdf-4fe6-a20e-feaac88307d6" id="sec.412-ssec.2-para1.a-para2.i-note-he">Note—</heading><block><txt break.before="1">For mandatory conditions, see <intref check="valid" refid="ch.4-pt.2-div.4" target.guid="_5ab9c4a0-ba56-43ac-864e-32aa3501b2bc">division 4</intref> (Key mandatory conditions for pipeline licences) and <intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref>, <intref check="valid" refid="ch.5-pt.8" target.guid="_6fd5c183-bb2d-498f-bceb-5e0aff62d198">part 8</intref> (General provisions for conditions and authorised activities).</txt></block></note></block></li><li guid="_bacdfb78-da3b-4066-9baf-4f810d8d8f81" id="sec.412-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the same as, or substantially the same as, or inconsistent with, any relevant environmental condition for the licence; and</txt></block></li></list></block></li><li guid="_aa6d4189-9c50-4f7a-bd85-2cf011f5544c" id="sec.412-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">review days for the licence; and</txt><note guid="_d504b851-2003-43b4-a15e-b97e02aa4568" id="sec.412-ssec.2-para1.b-note" type="example"><heading guid="_db0908a4-85d2-4984-a761-cfe2a7002ff9" id="sec.412-ssec.2-para1.b-note-he">Note—</heading><block><txt break.before="1">For the consequences of a pipeline licence having review days, see <intref check="valid" refid="ch.4-pt.2-div.7" target.guid="_aec9c2b4-5e14-4927-bdc5-a34963203dd0">division 7</intref>.</txt></block></note></block></li><li guid="_63a6d89f-ea2a-441d-8918-f371db197610" id="sec.412-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the day it takes effect.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d0c5ca48-3e02-4a07-8b10-c992046e5308" id="sec.412-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the provisions of the licence may exclude or restrict the carrying out of an authorised activity for the licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_473da53c-ea83-4697-a56a-bafc5a858ef1" id="sec.412-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If no day of effect is stated, the licence takes effect on the day it is granted.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5bdbcf5c-6358-4153-8527-23082b2f6f73" id="sec.412-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">This section applies subject to <intref check="valid" refid="sec.412A" target.guid="_5237f0a2-dee2-44a2-9f3d-9058b798ccb3">section 412A</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_5237f0a2-dee2-44a2-9f3d-9058b798ccb3" id="sec.412A" provision.type="other" spent.amends="0"><no>412A</no><heading guid="_dfcb1c53-38dd-4217-9baa-21e1631c3770" id="sec.412A-he">Provisions about grant and conditions of licence for coordinated project</heading><subclause affected.by.uncommenced="0" guid="_df483e6d-b187-4446-8f6a-c054f405f9f5" id="sec.412A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a pipeline licence or proposed pipeline licence is for a coordinated project.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6e3cb798-126f-4a46-9747-6d7a2470b0b2" id="sec.412A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister must not grant the licence until the Minister has been given the Coordinator-General’s report for the project.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e071b79b-e708-4715-af55-6a167864fe68" id="sec.412A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Any Coordinator-General’s conditions for the licence must be stated in the licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d23e5e3c-0f5e-42c0-a447-5136bc02650a" id="sec.412A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Any other condition of the licence stated under <intref check="valid" refid="sec.412" target.guid="_4254ee96-45e5-4851-882e-f6dbec58a009">section 412</intref> must not be inconsistent with the Coordinator-General’s conditions.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7fa0c40f-3933-4299-8918-c0bae9aa8ac5" id="sec.412A-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If a mandatory condition for pipeline licences conflicts with any of the Coordinator-General’s conditions, the Coordinator-General’s condition prevails to the extent of the inconsistency.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_da43b0ac-1bce-4941-9aa8-6e978b5b7b54" id="sec.413" provision.type="other" spent.amends="0"><no>413</no><heading guid="_9c48dd1e-33d6-4d93-9df7-e8eb9a7a5aed" id="sec.413-he">Restriction on imposing takeover condition</heading><subclause affected.by.uncommenced="0" guid="_b715303e-998a-4131-bad9-1dfa07879f3d" id="sec.413-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A pipeline licence may include a condition (a <defterm guid="_e3a7eb45-a390-4d59-bc3c-7c10d2ffa955" id="sec.413-def.takeovercondition" type="definition">takeover condition</defterm>) that takeover action may be taken on grounds, or in circumstances, stated in the licence only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9fee4144-6e5e-4704-b92c-ddc2f4944e0e" id="sec.413-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the licence is a point-to-point pipeline licence; and</txt></block></li><li guid="_cb3a44b0-1168-4bd2-9d11-38681eeeb14d" id="sec.413-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Minister is satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1e85fd78-f6c8-41b6-9a42-acfddb10a38e" id="sec.413-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">an appropriate competitive tender process has been carried out to select the developer for the pipeline; and</txt></block></li><li guid="_5b996913-b148-4a73-928a-f27ac0bf1c6f" id="sec.413-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a contract to which the State and the applicant are parties provides for the imposition of the condition.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ad50bf78-1e69-477a-ac3d-d9a161b0e197" id="sec.413-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_78347949-9ed8-4a1d-b31a-30339cc49cae" id="sec.413-ssec.2-def.takeoveraction_"><txt break.before="1"><defterm guid="_46d9ee2e-d4e5-4e79-916e-920f9659ed68" id="sec.413-ssec.2-def.takeoveraction" type="definition">takeover action</defterm> means doing 1 or more of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f4c3d91a-4b1b-42a2-83ac-d2df31cc7b70" id="sec.413-ssec.2-def.takeoveraction-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">cancelling the licence, other than by way of noncompliance action;</txt></block></li><li guid="_78471e85-acb9-4ff1-8f22-0c1ba8931f37" id="sec.413-ssec.2-def.takeoveraction-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">transferring the pipeline to the State;</txt></block></li><li guid="_31f736a8-6b49-4110-9c60-07ebd243d1e2" id="sec.413-ssec.2-def.takeoveraction-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">taking over the construction of the pipeline;</txt></block></li><li guid="_5c3501ed-e944-43c0-9f22-546611061f7a" id="sec.413-ssec.2-def.takeoveraction-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">taking over the operation of the pipeline;</txt></block></li><li guid="_da9743c2-e4b5-4a6a-b00c-40c04a35d4f8" id="sec.413-ssec.2-def.takeoveraction-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">transferring to the State the licence holder’s interest in pipeline land for the pipeline;</txt></block></li><li guid="_26aab375-fc61-44e5-9b53-363e76df12b1" id="sec.413-ssec.2-def.takeoveraction-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">transferring 1 or more of the following to an entity other than the State—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b27751f5-c8af-49a6-8c35-6d6c9c9ea40c" id="sec.413-ssec.2-def.takeoveraction-para1.f-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the pipeline;</txt></block></li><li guid="_55f86b24-d741-4b86-81ce-8044cc6b353f" id="sec.413-ssec.2-def.takeoveraction-para1.f-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the licence;</txt></block></li><li guid="_17ae0c4c-820f-416e-87da-895f11b98980" id="sec.413-ssec.2-def.takeoveraction-para1.f-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the licence holder’s interest in pipeline land for the pipeline.</txt></block></li></list></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7d0750f7-925f-4d23-a248-020d9c000c30" id="sec.414" provision.type="other" spent.amends="0"><no>414</no><heading guid="_9748dc3e-e9bc-441a-99d4-a44cf37bf630" id="sec.414-he">Provision for reduction of area of licence</heading><block><txt break.before="1">A pipeline licence may provide that stated land ceases to be in the area of the licence if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_75d26d9a-f857-4806-a133-b0ca69f5498d" id="sec.414-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">construction of a stated pipeline is completed; and</txt></block></li><li guid="_c785761a-cc6f-4295-bf83-bc518eba823a" id="sec.414-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the land has not become pipeline land for the licence.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_ae02bb65-9f89-4ead-917c-ce9e43a0d081" id="sec.415" provision.type="other" spent.amends="0"><no>415</no><heading guid="_daa1c00b-c04f-4e5f-a43a-b40b717cfca4" id="sec.415-he">Criteria for decisions</heading><subclause affected.by.uncommenced="0" guid="_2d4465e5-75b3-47dc-8bf2-dc0315f7bc54" id="sec.415-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The matters that must be considered in deciding whether to grant a pipeline licence or deciding its provisions include each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0ce8f4e7-b714-41ea-8302-66f7c396646e" id="sec.415-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the applicant’s—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3ab26542-b2a9-4c99-ab5f-7da9ea0bc7fb" id="sec.415-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">financial and technical resources; and</txt></block></li><li guid="_f7737e03-1cf3-43c4-bfed-d3eb61237c38" id="sec.415-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">ability to competently and safely manage any construction and the operation of pipelines the subject of the licence;</txt></block></li></list></block></li><li guid="_95faae4a-de3c-4546-a211-f67c6bccd77e" id="sec.415-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the appropriateness of each pipeline for its purpose as stated in the application;</txt></block></li><li guid="_c8d088b4-fff9-4737-9c1d-5e1532fbaf9a" id="sec.415-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">for an area pipeline licence—the minimum area required for pipelines the subject of the licence;</txt></block></li><li guid="_17daa041-5bc6-4a6e-b06c-6db775f8173f" id="sec.415-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">if the area of the licence is, or is included in, the area of another petroleum authority or a mining interest—possible impacts of authorised activities under the licence on authorised activities under the other petroleum authority or on mining under the mining interest;</txt></block></li><li guid="_ee5b7242-65dd-4a2a-a6b2-9e9ebdf06792" id="sec.415-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the extent and nature of any proposed stated pipeline licence incidental activity for the licence;</txt></block></li><li guid="_655353dd-e52c-4135-a6cf-50780ff292ed" id="sec.415-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">whether the proposed licence is in the public interest.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_26a0854d-ad96-44d8-9fef-50e6c6f179f7" id="sec.415-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In considering the extent and nature of any proposed stated pipeline licence incidental activity, the Minister must have regard to the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_307b50f7-68c9-4e28-921e-8410eeec265d" id="sec.415-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">whether the carrying out of the activity under the pipeline licence would have the overall effect of reducing impacts of authorised activities on land, landowners and the community;</txt></block></li><li guid="_1f0b21cd-6e3e-4f8b-8646-936b9436d89e" id="sec.415-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether the activity is reasonably necessary for, or incidental to, carrying out an authorised activity for a petroleum lease, a petroleum facility licence or another pipeline licence;</txt></block></li><li guid="_c16efa29-28a5-49af-94ea-82b3c0ca65c2" id="sec.415-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">whether the activity would be more appropriately carried out under a petroleum lease, a petroleum facility licence or another pipeline licence.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_fb5cd3c6-c766-4180-b240-4cc4113c3d12" id="sec.416" provision.type="other" spent.amends="0"><no>416</no><heading guid="_5ee8a2e6-68a9-472e-8c42-d1f5a0638666" id="sec.416-he">Information notice about refusal</heading><block><txt break.before="1">On refusal of the application, the applicant must be given an information notice about the decision to refuse.</txt></block></clause></subdivision></division><division affected.by.uncommenced="0" guid="_5ab9c4a0-ba56-43ac-864e-32aa3501b2bc" id="ch.4-pt.2-div.4"><no>Division 4</no><heading guid="_700ae10b-a669-4a9a-b993-2b08b4ce6a39" id="ch.4-pt.2-div.4-he">Key mandatory conditions for pipeline licences</heading><clause affected.by.uncommenced="0" guid="_792f3492-8a43-47bd-9614-b9405bac0cc2" id="sec.417" provision.type="other" spent.amends="0"><no>417</no><heading guid="_b5b0c88c-712c-43ab-aa45-5995f69f2883" id="sec.417-he">Operation of <intref check="valid" refid="ch.4-pt.2-div.4" target.guid="_5ab9c4a0-ba56-43ac-864e-32aa3501b2bc">div 4</intref></heading><block><txt break.before="1">This division provides for particular mandatory conditions for pipeline licences.</txt><note guid="_6b4c2339-080a-4f02-b543-e5b82ef8218f" id="sec.417-note" type="example"><heading guid="_56b9900a-901d-420c-81a3-c54df492adcd" id="sec.417-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_81b42794-3470-4f94-aaf1-d8fc2fe19992" id="sec.417-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0"><intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">Chapter 5</intref> also provides for mandatory conditions for pipeline licences.</txt></block></li><li guid="_a2d25af0-5c44-4628-a82f-365f1034c74b" id="sec.417-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">For what is a mandatory condition, see <intref check="valid" refid="sec.20" target.guid="_746e989f-44f2-4d9b-9550-13495b74b131">section 20</intref><intref check="valid" refid="sec.20-ssec.2" target.guid="_6716699a-7cd3-4f35-945e-49a35a3ccdd3">(2)</intref>.</txt></block></li></list></block></note></block></clause><clause affected.by.uncommenced="0" guid="_40fac79a-f0cb-4c32-96a3-94cac60470b3" id="sec.419" provision.type="other" spent.amends="0"><no>419</no><heading guid="_457fb49d-fed3-444f-a1c5-de4bcc803bde" id="sec.419-he">Obligation to construct pipeline</heading><subclause affected.by.uncommenced="0" guid="_abe124cb-403d-41c8-9860-f3ae740f9283" id="sec.419-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.401" target.guid="_0741738d-27f0-4420-91c6-dfbec69fdbe6">sections 401</intref> and <intref check="valid" refid="sec.419A" target.guid="_a18c16a0-b005-48be-a17d-637ddbe1a723">419A</intref>, a pipeline licence holder must complete construction of the pipeline the subject of the licence on or before any completion day for the construction stated in the licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f04c485e-ad22-44dc-9903-b4bebd2226b1" id="sec.419-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if the licence is an area pipeline licence, <intref check="valid" refid="sec.419-ssec.1" target.guid="_abe124cb-403d-41c8-9860-f3ae740f9283">subsection (1)</intref> only applies for each initial pipeline mentioned in the licence.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a18c16a0-b005-48be-a17d-637ddbe1a723" id="sec.419A" provision.type="other" spent.amends="0"><no>419A</no><heading guid="_6c771a9e-cf91-4979-aa47-a7c3b1f533cc" id="sec.419A-he">Notice to chief inspector before construction starts</heading><subclause affected.by.uncommenced="0" guid="_44962c74-8f61-48f0-9bf5-70b5808724b1" id="sec.419A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A pipeline licence holder must give the chief inspector notice of the holder’s intention to start construction of the pipeline the subject of the licence at least 20 business days before the construction starts.</txt></block><penalty guid="_17efd0ac-a3a4-4529-9c84-eb99e712093d" id="sec.419A-ssec.1-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty><note guid="_a7c333e8-b23b-48f8-87a5-7ab0b4d33945" id="sec.419A-ssec.1-note" type="example"><heading guid="_3ab0107f-38a0-49a0-8d2c-05851217f291" id="sec.419A-ssec.1-note-he">Note—</heading><block><txt break.before="1">For other relevant provisions about giving the chief inspector documents, see <intref check="valid" refid="sec.851AA" target.guid="_1bb215c0-29c7-436b-85d1-d8220a60416c">section 851AA</intref>.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_f36ae340-d927-4427-813a-dfb11de137c5" id="sec.419A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if the licence is an area pipeline licence, <intref check="valid" refid="sec.419A-ssec.1" target.guid="_44962c74-8f61-48f0-9bf5-70b5808724b1">subsection (1)</intref> only applies for each initial pipeline mentioned in the licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f2b868d0-ad0c-416f-9e47-c0ae26f290c2" id="sec.419A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">An applicant for a pipeline licence may give a notice under <intref check="valid" refid="sec.419A-ssec.1" target.guid="_44962c74-8f61-48f0-9bf5-70b5808724b1">subsection (1)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_28b5dc06-da0a-46da-8001-823203b021a4" id="sec.419A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The day stated for construction to start may be stated as the day the applicant becomes the holder of the licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_18ae6063-70c7-4d9d-be58-32856337aa7b" id="sec.419A-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">This section does not apply to the holder of a pipeline licence if the pipeline to be constructed is for transporting produced water.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_812d93ae-f298-4384-b1c8-844c458405d7" id="sec.420" provision.type="other" spent.amends="0"><no>420</no><heading guid="_cd1b5c11-00f9-412c-9ee2-314c9d08d104" id="sec.420-he">Notice of completion of pipeline</heading><subclause affected.by.uncommenced="0" guid="_e60fd882-9f01-4510-9ba1-aa318e001b5b" id="sec.420-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3908609c-8bbe-48ab-8965-1bf64f0b3fa8" id="sec.420-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the construction of a pipeline under an area pipeline licence is completed; or</txt></block></li><li guid="_f62dbec6-d753-488a-854a-086e187b5144" id="sec.420-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a pipeline the subject of a point-to-point pipeline licence is completed.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_090d0355-f189-4def-9da8-905b82a6d7f8" id="sec.420-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The licence holder must, within the relevant period, lodge a notice of completion of the pipeline.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_83c0bb82-4f66-4cb2-b233-d627c9737845" id="sec.420-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The notice must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_94e97f9f-f79e-4581-b97f-65fda5480035" id="sec.420-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">state the day the pipeline was completed; and</txt></block></li><li guid="_f5ec5882-1c75-4b66-add7-c62a8ddeff7c" id="sec.420-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">describe—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_27233c04-e42a-4321-a305-7dc0c1619794" id="sec.420-ssec.3-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the pipeline land for the licence; and</txt></block></li><li guid="_9925088e-0baf-42be-90cf-e5cdc13bceed" id="sec.420-ssec.3-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">any public land in the area of the licence the holder reasonably requires to operate the pipeline; and</txt></block></li></list></block></li><li guid="_9c245f1e-e7de-499c-88b9-a964075f184e" id="sec.420-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">include a diagram of the pipeline, as constructed or completed, that gives enough information to allow the pipeline to be located, including, for example, its depth of burial; and</txt></block></li><li guid="_5f46d099-4ced-43b4-9a7d-77146669e071" id="sec.420-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">be accompanied by the handling fee to record the information, as prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9552cd39-1b3a-4876-8dfa-085f6aa31311" id="sec.420-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_9fcf2e6a-2a28-412f-954c-eacde1fe9964" id="sec.420-ssec.4-def.relevantperiod_"><txt break.before="1"><defterm guid="_6b9c27e2-c9ea-4a70-ab0e-acc3638accf3" id="sec.420-ssec.4-def.relevantperiod" type="definition">relevant period</defterm> means the period that ends—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6e1af81a-e3eb-4823-86bd-e198d2bfc19d" id="sec.420-ssec.4-def.relevantperiod-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for a pipeline the subject of a point-to-point pipeline licence—6 months after its completion; or</txt></block></li><li guid="_0e4972d9-c2fd-43c7-b7e6-c18cf9426f26" id="sec.420-ssec.4-def.relevantperiod-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for a pipeline under an area pipeline licence—40 business days after its completion.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e2d600b0-31c9-413d-8693-5364d66909f8" id="sec.421" provision.type="other" spent.amends="0"><no>421</no><heading guid="_df72d7ea-2c46-44de-9f3c-f5a87b1fdd69" id="sec.421-he">Notice to public road authority of pipeline constructed on public road</heading><block><txt break.before="1">If a pipeline licence holder constructs a pipeline on a public road, the holder must, within 6 months after completing the pipeline—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5c712308-22ab-4554-8be2-3a5e1169297a" id="sec.421-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">give the public road authority for the road accurate details of the location of the pipeline; and</txt></block></li><li guid="_53db2919-3b80-4c54-b876-12e3f2be4eb4" id="sec.421-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">keep complete and accurate records of the location of the pipeline.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_e1043c6e-8913-45a9-9f4c-64f78fc973f5" id="sec.422" provision.type="other" spent.amends="0"><no>422</no><heading guid="_70f8b7c3-4ad5-46cc-958b-20434ec823b0" id="sec.422-he">Obligations in operating pipeline</heading><subclause affected.by.uncommenced="0" guid="_f0e3a5f7-4293-4945-a50e-40f8c49aef46" id="sec.422-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The holder of a pipeline licence must, after the pipeline has been constructed, operate it in a way that ensures its continuing capacity to safely and reliably transport—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a3b65242-3fbd-4127-97c3-6379541ed104" id="sec.422-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">petroleum, fuel gas or produced water; and</txt></block></li><li guid="_ea03ff7f-8020-4c67-ac3e-179b9d71f65d" id="sec.422-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if, under <intref check="valid" refid="sec.402" target.guid="_162af7e9-4ec5-415a-92d5-f4bf364cfe65">section 402</intref>, the right to operate the pipeline is extended to include another substance—the other substance.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_19673284-5e65-4864-9f1b-2bef0b4d4bf1" id="sec.422-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">It is a condition of a pipeline licence that the pipeline not remain unused for a continuous period of more than 3 years, unless the Minister otherwise agrees.</txt><note guid="_73353e5f-79d4-405f-b03f-0cbef1f25f61" id="sec.422-ssec.2-note" type="example"><heading guid="_5c945d14-58d9-43e6-982f-a4b2c09c5740" id="sec.422-ssec.2-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.559" target.guid="_12ade87e-2fc7-4058-a699-e18c71c46118">sections 559</intref> (Obligation to decommission pipelines) and <intref check="valid" refid="sec.804" target.guid="_4e15b11d-d924-4a3b-a242-713d6a864be9">804</intref> (Duty to avoid interference in carrying out authorised activities).</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_233b8808-9b7b-4ad9-ab9f-a2b570e4cebc" id="sec.422A" provision.type="other" spent.amends="0"><no>422A</no><heading guid="_ca056657-f7a5-4890-8476-a66136ffad96" id="sec.422A-he">Obligation to hold relevant environmental authority and water licence</heading><block><txt break.before="1">The holder of a pipeline licence for transporting produced water must, for the term of the licence, be the holder of a relevant environmental authority for the licence.</txt></block></clause><clause affected.by.uncommenced="0" guid="_656f4eb4-5cc9-4400-a2a4-c61a59f57321" id="sec.423" provision.type="other" spent.amends="0"><no>423</no><heading guid="_4917b66f-f6ac-4a93-914a-4cb6542fd93f" id="sec.423-he">Annual fees</heading><subclause affected.by.uncommenced="0" guid="_f8c58bd8-04b9-40f4-a654-24d7825f9630" id="sec.423-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A pipeline licence holder must pay the State an annual licence fee as prescribed under a regulation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_32f1da4b-1fc7-4389-874a-6a79d90b5469" id="sec.423-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.423-ssec.3" target.guid="_276db63e-5ee9-4bdf-bdd6-c2b6ce1aadb1">Subsection (3)</intref> applies to a pipeline licence holder if a pipeline the subject of the licence is a covered pipeline under the National Gas (Queensland) Law.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_276db63e-5ee9-4bdf-bdd6-c2b6ce1aadb1" id="sec.423-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The pipeline licence holder must also pay the State an annual fee, that is a proportion of the cost of the State’s funding commitments to national energy market regulation, as prescribed by regulation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b5228f47-303d-47bd-8cf0-690296128a54" id="sec.423-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The fee mentioned in <intref check="valid" refid="sec.423-ssec.3" target.guid="_276db63e-5ee9-4bdf-bdd6-c2b6ce1aadb1">subsection (3)</intref> is calculated based on the kilometres of pipeline the subject of the holder’s pipeline licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c5906921-2456-469b-9bc5-4446c2735d71" id="sec.423-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">A fee mentioned in <intref check="valid" refid="sec.423-ssec.1" target.guid="_f8c58bd8-04b9-40f4-a654-24d7825f9630">subsection (1)</intref> or <intref check="valid" refid="sec.423-ssec.3" target.guid="_276db63e-5ee9-4bdf-bdd6-c2b6ce1aadb1">(3)</intref> must be paid in the way, and on or before the day, prescribed by regulation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_93a6a701-e86a-40e6-a0bb-95ef374873ea" id="sec.423-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_82f41b46-7c13-4004-9f87-72a3db80684e" id="sec.423-ssec.6-def.AEMC_"><txt break.before="1"><defterm guid="_80fe5cd2-7b82-4455-bd50-16f18eee1dfa" id="sec.423-ssec.6-def.AEMC" type="definition">AEMC</defterm> has the meaning given in the National Gas (Queensland) Law.</txt></definition><definition affected.by.uncommenced="0" guid="_ef3a56a2-8e94-4f94-8d13-1603668de506" id="sec.423-ssec.6-def.nationalenergymarketregulation_"><txt break.before="1"><defterm guid="_e9f10054-5690-4021-b862-71e07de08cf6" id="sec.423-ssec.6-def.nationalenergymarketregulation" type="definition">national energy market regulation</defterm> means the functions and powers of the AEMC under the National Gas (Queensland) Law, <legref check="invalid" jurisd="QLD" type="act">section 69</legref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_9f46887c-2fb3-4c6d-8049-c45b79067afd" id="sec.424" provision.type="other" spent.amends="0"><no>424</no><heading guid="_06bd757a-21ec-48ac-bbb3-60506df90660" id="sec.424-he">Civil penalty for nonpayment of annual fees</heading><subclause affected.by.uncommenced="0" guid="_b31b01ce-af48-4212-81bb-0d5558cbe229" id="sec.424-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a pipeline licence holder does not pay a fee as required under <intref check="valid" refid="sec.423" target.guid="_656f4eb4-5cc9-4400-a2a4-c61a59f57321">section 423</intref>, the holder must also pay the State a civil penalty.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4c8ee847-8e8f-4c9c-8427-86c252e15066" id="sec.424-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The amount of the penalty is 15% of the fee.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_21b6ecf4-0e4c-472d-836d-90a1ef701382" id="sec.424-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The penalty—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_35cd2aae-2ab3-4f6e-ac45-4d5de5e0687d" id="sec.424-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must be paid on the day after the last day for payment of the fee; and</txt></block></li><li guid="_b7fb24e2-7323-477a-adb0-2c204df67611" id="sec.424-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is still payable even if the holder later pays the fee.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_24890536-df6d-47ae-b6a4-54639dd7e3ec" id="sec.424A" provision.type="other" spent.amends="0"><no>424A </no><heading guid="_68408998-76cf-4467-a672-4ae30599ca6e" id="sec.424A-he">Power to impose or amend condition if changed holder of pipeline licence</heading><subclause affected.by.uncommenced="0" guid="_68fa189b-3a7f-4a82-9602-ec3ddb5d6a84" id="sec.424A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if 1 of the following changes happens—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b6f0d93d-a867-4ce3-abac-efc24b211627" id="sec.424A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an entity starts or stops controlling the holder of a pipeline licence under the Corporations Act, section 50AA; </txt></block></li><li guid="_7f93c1b0-0466-44e7-adbb-1a0a2f9e8ebe" id="sec.424A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder of a pipeline licence starts or stops being a subsidiary of a corporation under the Corporations Act, section 46.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_aed9ecc7-f100-4949-aa1e-43232706cd65" id="sec.424A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister may consider whether, after the change, the holder of the pipeline licence has the financial and technical resources to comply with the conditions of the pipeline licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_29c5fe21-d2c4-4fcc-8ede-4836d1c31e0f" id="sec.424A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the Minister considers the holder of the pipeline licence may not have the financial and technical resources to comply with conditions of the pipeline licence, the Minister may impose another condition on, or amend a condition of, the pipeline licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_14fc33e1-2e21-41f1-a473-4dcc1453430f" id="sec.424A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the Minister believes a change mentioned in subsection (1) may have happened, the Minister may require the holder of the pipeline licence to give the Minister information or a document about whether or not the change has happened.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_75f75467-ed93-4d96-8c75-f2426bd0702f" id="sec.424A-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Before deciding to impose another condition on, or amend a condition of, the pipeline licence under subsection (3), the Minister may require the holder of the pipeline licence to give the Minister information or a document the Minister requires to make the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3015e654-49ee-4f13-91de-c498cdbef541" id="sec.424A-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">A requirement under subsection (4) or (5) must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cd2480d9-9a58-4ff5-8791-eff5b97a203b" id="sec.424A-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be made by notice given to the holder; and</txt></block></li><li guid="_0c7104ee-74bf-486a-a134-48b881df9302" id="sec.424A-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state a period of at least 10 business days within which the holder must comply with the requirement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_47498178-3191-4eb9-bf1a-f8e6824c00b9" id="sec.424A-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">Before deciding to impose another condition on, or amend a condition of, the pipeline licence under subsection (3), the Minister must give the holder of the licence a notice stating—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1efdb7c1-d09f-494c-870c-4568aa405fed" id="sec.424A-ssec.7-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the proposed decision; and</txt></block></li><li guid="_f30f2eb3-c951-41da-a5f6-3bec86937b08" id="sec.424A-ssec.7-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the reasons for the proposed decision; and</txt></block></li><li guid="_85810a4f-7b5c-492d-85f2-2741b2c207a0" id="sec.424A-ssec.7-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that the holder may, within 10 business days after the notice is given, make submissions to the Minister about the proposed decision.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8e65388e-eb76-4853-ad23-9b3392d290d3" id="sec.424A-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">The Minister may extend the period mentioned in subsection (6)(b) or (7)(c) by notice given to the holder of the pipeline licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e00e9241-c662-49b5-84b2-92df12dedead" id="sec.424A-ssec.9" provision.type="other"><no>(9)</no><block><txt break.before="0">In deciding whether to impose another condition on, or amend a condition of, the pipeline licence under subsection (3), the Minister—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dd1d5b52-6348-47a8-8474-28860d2ec032" id="sec.424A-ssec.9-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must consider information or a document, if any, given under subsection (6)(b) or (7)(c); and</txt></block></li><li guid="_74f30662-fd24-42ab-8e88-9f71ca391dc3" id="sec.424A-ssec.9-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">may consider any other matter the Minister considers relevant.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3e215a81-9058-423f-a787-779f18aa8f01" id="sec.424A-ssec.10" provision.type="other"><no>(10)</no><block><txt break.before="0">If the Minister decides to impose another condition on, or amend a condition of, the pipeline licence under subsection (3), the Minister must, as soon as practicable after making the decision, give the holder a notice stating the decision and the reasons for the decision.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_f3ab825e-5807-4c98-bded-bf37ef7d5217" id="ch.4-pt.2-div.5"><no>Division 5</no><heading guid="_05ff5e65-73df-4194-acef-ea747854e6c6" id="ch.4-pt.2-div.5-he">Amendment of point-to-point pipeline licences after pipeline completed</heading><clause affected.by.uncommenced="0" guid="_6071c553-84a3-4359-9358-ec9882159b35" id="sec.425" provision.type="other" spent.amends="0"><no>425</no><heading guid="_9b117c56-a79b-457b-ac54-bcc1abcfd64e" id="sec.425-he">Power to amend</heading><block><txt break.before="1">If the holder of a point-to-point pipeline licence gives a notice under <intref check="valid" refid="sec.420" target.guid="_812d93ae-f298-4384-b1c8-844c458405d7">section 420</intref>, the Minister may amend the licence to reduce its area to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d6749c60-3137-40d1-8c27-c1815c445329" id="sec.425-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the pipeline land for the licence; and</txt></block></li><li guid="_7bb3fcf9-bd60-43e4-82cb-b1b64f54e032" id="sec.425-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any public land in the area of the licence stated in the notice.</txt></block></li></list></block></clause></division><division affected.by.uncommenced="0" guid="_25ed81fb-6eda-4bcc-ad08-6c2337a059fc" id="ch.4-pt.2-div.6"><no>Division 6</no><heading guid="_b5e785da-da31-4121-b43f-9538c896a44c" id="ch.4-pt.2-div.6-he">Provisions for public land authorities</heading><subdivision affected.by.uncommenced="0" guid="_d2ae9908-6f86-4d98-bdee-656ef1cae918" id="ch.4-pt.2-div.6-sdiv.1"><no>Subdivision 1</no><heading guid="_741fc4e1-0342-4880-a8a1-34bcb8900dfc" id="ch.4-pt.2-div.6-sdiv.1-he">Public roads</heading><clause affected.by.uncommenced="0" guid="_ff93d90d-56fe-4cdc-a6ea-dc5ca669ea4e" id="sec.426" provision.type="other" spent.amends="0"><no>426</no><heading guid="_1169a5d7-f567-4eb8-b544-c83df03f531a" id="sec.426-he">Public road authority’s obligations in aligning pipeline on road</heading><block><txt break.before="1">If, under the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.59" target.doc.id="act-2014-047" target.guid="_4baf33c5-f5ce-41d6-a20f-616fa6f7118a" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">section 59</legref>, a public road authority imposes a condition about an alignment for a pipeline on, or proposed to be constructed on, a public road the alignment must be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6d51b4f0-8259-4d79-a88a-6e518a6ff931" id="sec.426-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">situated to ensure reasonable protection for the pipeline and infrastructure proposed to be constructed in the carrying out of a stated pipeline licence incidental activity for the pipeline; and</txt></block></li><li guid="_e1a17728-07e3-49b4-8e96-218e67c7e708" id="sec.426-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if practicable, on the footpath or verge of the road.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_41303dc3-d05d-4bad-ae05-0de6bb636ba4" id="sec.427" provision.type="other" spent.amends="0"><no>427</no><heading guid="_e84f79d0-e66a-4d92-b526-b0db7073b30c" id="sec.427-he">Requirement to consult if construction affects existing pipeline or infrastructure</heading><subclause affected.by.uncommenced="0" guid="_45d76766-dc38-40cc-a814-556cdad86658" id="sec.427-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a public road authority proposes to construct or change a public road in a way that is likely to affect the location, operation or safety of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_456482fc-bfdb-4bbd-8371-fcde088d7aa6" id="sec.427-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a pipeline; or</txt></block></li><li guid="_e916dd0a-500b-43fc-a196-524ba00d4399" id="sec.427-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">infrastructure constructed in the carrying out of a stated pipeline licence incidental activity.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_35d09400-e708-4e52-b1a1-39629652c068" id="sec.427-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The authority must give the relevant pipeline licence holder a notice stating—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c4d471d7-22c3-4af0-83f5-7f9f4233d10d" id="sec.427-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">details of the proposed road or proposed change; and</txt></block></li><li guid="_f9bdc437-18b4-4edf-bc1f-40be347a2473" id="sec.427-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that the holder may, within a stated period, lodge submissions to the authority about the proposal at the office of the authority stated in the notice.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e78c74c4-13ff-49a6-8948-60e9e8e7004c" id="sec.427-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The stated period must not end before 30 business days after the notice is given.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ce0bb1f7-beb7-43ab-91c8-1a179ec9abed" id="sec.427-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Before deciding to implement the proposal, the authority must consider any submissions lodged by the holder within the stated period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5001486a-8154-4307-b675-a3d809ed9b96" id="sec.427-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the authority decides to implement the proposal, it must give the holder notice of the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_24c6508e-5a4d-4770-a143-667f87c099c0" id="sec.428" provision.type="other" spent.amends="0"><no>428</no><heading guid="_a9ff7c73-dca6-40b6-b2bf-7580f63ff14f" id="sec.428-he">Costs of pipeline works caused by public road construction</heading><subclause affected.by.uncommenced="0" guid="_8b3aa24e-fef9-4d36-9df7-857c54e1b33a" id="sec.428-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2567ccdf-cb9c-4a76-95ef-c46740379bdd" id="sec.428-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a public road authority constructs, or changes, a public road; and</txt></block></li><li guid="_8f65b977-1567-48d5-b1fa-9c6a86fa2009" id="sec.428-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the road, or the road as changed, affects the safety, location or operation of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_46525a91-78d1-4a26-b97e-6cbb094a110b" id="sec.428-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a pipeline constructed, or operated, or proposed to be constructed or operated; or</txt></block></li><li guid="_7e2cfe0f-1a31-4b7b-b0df-e180ac6174ee" id="sec.428-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">infrastructure constructed, or operated, or proposed to be constructed or operated, in the carrying out of a stated pipeline licence incidental activity; and</txt></block></li></list></block></li><li guid="_88c2410a-f58e-488d-a6df-0d981ac10bfd" id="sec.428-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">because of the effects, it is necessary for the holder of the pipeline licence for the pipeline to carry out works relating to the pipeline or the infrastructure.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_93f2004d-9eb7-4a9a-b338-c80af48c9cfb" id="sec.428-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The holder must bear the holder’s own costs of carrying out the works if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_63b43038-d45a-496d-97a0-29948292f3bd" id="sec.428-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the road existed before the pipeline or infrastructure was constructed; or</txt></block></li><li guid="_cc60eeed-1314-4be9-9a0c-d8df4c9185ba" id="sec.428-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the road is constructed on an area that was dedicated to public use as a road before the pipeline or infrastructure was constructed.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2e2275ec-73d5-4f3c-8ce6-6fd57c935f4d" id="sec.428-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Otherwise, the holder may recover from the authority as a debt any reasonable costs the holder incurs in carrying out the works.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_85613bdd-cb56-4a87-8377-7bb74f4b2bd2" id="sec.429" provision.type="other" spent.amends="0"><no>429</no><heading guid="_36374669-6aee-4356-8b3a-3eba63db809d" id="sec.429-he">Public road authority’s obligation to give holder information</heading><subclause affected.by.uncommenced="0" guid="_0f8d1aba-989f-4863-a94e-582060e0ec59" id="sec.429-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a pipeline licence holder asks a public road authority for a public road in the area of the licence for information about—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_92b663fd-95b6-4e7b-bdd3-4ab14bd5500e" id="sec.429-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the permanent level of the road; or</txt></block></li><li guid="_6337bd9a-f07c-474f-b4d4-b38d9a655bae" id="sec.429-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the alignment allocated by the authority for a pipeline the subject of the licence.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8cf455a3-5eca-43bc-aab5-b579b2d9f580" id="sec.429-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The authority must comply with the request within 20 business days after it is made.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bf8c6e7b-469b-404e-a54b-762befac818e" id="sec.429-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The information given must be accurate and as complete as possible.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0927aa7d-a341-4d4b-8f9e-77400b8715ca" id="sec.430" provision.type="other" spent.amends="0"><no>430</no><heading guid="_ecef3a7d-1667-4176-bfef-09835b8260fc" id="sec.430-he">Consequence of not giving information</heading><block><txt break.before="1">If a public road authority does not comply with a request under <intref check="valid" refid="sec.429" target.guid="_85613bdd-cb56-4a87-8377-7bb74f4b2bd2">section 429</intref> about a public road, the pipeline licence holder that made the request may decide a reasonable permanent level and alignment for the road, based on—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_853b7db1-5e17-4e10-9c02-ac3c12852738" id="sec.430-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">information available to the holder; and</txt></block></li><li guid="_786277ff-54f4-4382-a317-4d5d23b30ca5" id="sec.430-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any standards prescribed under <intref check="valid" refid="sec.557" target.guid="_275a3420-b674-47b8-a985-0140d4ef8dd4">section 557</intref><intref check="valid" refid="sec.557-ssec.1" target.guid="_dbc11254-2b51-4355-8f48-da8d6f0c7e2e">(1)</intref><intref check="valid" refid="sec.557-ssec.1-para1.b" target.guid="_db5c8880-cf34-41bf-9c29-1b2a8afc1319">(b)</intref> for constructing pipelines on roads.</txt></block></li></list></block></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_fdd016d0-7685-4b38-ae5a-32c7280a322d" id="ch.4-pt.2-div.6-sdiv.2"><no>Subdivision 2</no><heading guid="_24feb8f9-69d9-4c9f-9503-8d8682b3f7f5" id="ch.4-pt.2-div.6-sdiv.2-he">Works directions</heading><clause affected.by.uncommenced="0" guid="_354af727-6927-42e9-b3ff-47c7a02721b6" id="sec.431" provision.type="other" spent.amends="0"><no>431</no><heading guid="_b686a5e7-8474-46ad-b7e4-d378d2f12fa1" id="sec.431-he">Power to give works directions</heading><subclause affected.by.uncommenced="0" guid="_dfee32c3-bc25-4977-8c29-fdd782047123" id="sec.431-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5d9ec74b-fd4d-4979-929e-0a31c748aa6b" id="sec.431-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a pipeline licence holder proposes to construct, has constructed, or is constructing—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6a847fff-a7e6-4ec1-bce9-bee7b2308fa5" id="sec.431-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a pipeline on or through public land; or</txt></block></li><li guid="_d58ec15d-ad8d-40a3-95ac-313636343587" id="sec.431-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">infrastructure in the carrying out of a stated pipeline licence incidental activity; and</txt></block></li></list></block></li><li guid="_96a6c775-f6a4-49ab-918a-7bea30d1e634" id="sec.431-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the public land authority for the land has imposed a condition relating to the construction; and</txt></block></li><li guid="_f0e78df8-1a76-4204-b9f9-5b8eae5032b0" id="sec.431-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the authority reasonably considers works should be carried out to ensure compliance with the condition.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_49b014f2-6414-453b-975b-0bc8412be865" id="sec.431-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The authority, may give the holder a notice (a <defterm guid="_bcc77b54-cf5f-4d3d-aad8-c403be39b594" id="sec.431-def.worksdirection" type="definition">works direction</defterm>) directing the holder to carry out stated works to comply with the condition within a stated reasonable period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_70f1f91d-abb7-48d6-bbc4-2ad01a4ce8fd" id="sec.431-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The works direction must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0c4963cf-76f9-4567-b8b3-8a21dd1b9cf2" id="sec.431-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">identify the relevant condition; and</txt></block></li><li guid="_1b7dcc2b-b683-4c8c-a15c-1a8d4be2c40a" id="sec.431-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">include, or be accompanied by, an information notice about the decision to make the works direction.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_60fd86fd-0b2f-49af-a27d-39a7a0922fbb" id="sec.431-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Works stated in a works direction must comply with any standard prescribed under a regulation for carrying out the works to the extent the standard is relevant to the works.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3990aa7e-8ad8-46ea-afda-b70f8b13d091" id="sec.432" provision.type="other" spent.amends="0"><no>432</no><heading guid="_ab41e640-aa25-47eb-8382-fa55bb67ade7" id="sec.432-he">Compliance with works direction</heading><subclause affected.by.uncommenced="0" guid="_d361b070-787e-48ce-a76b-b1937539b5b1" id="sec.432-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A pipeline licence holder to whom a works direction has been given must, within the period stated in it, comply with the direction to the reasonable satisfaction of the public land authority that gave the direction.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_22c4099c-dc2d-47b6-96b4-388d7d4725b5" id="sec.432-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the holder does not comply with <intref check="valid" refid="sec.432-ssec.1" target.guid="_d361b070-787e-48ce-a76b-b1937539b5b1">subsection (1)</intref> the authority may ensure the works the subject of the direction are carried out.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f96cced9-6959-4c4b-8e09-c9f99e1fc726" id="sec.432-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The authority may recover from the holder as a debt any reasonable costs the authority incurs in ensuring the works are carried out.</txt></block></subclause></clause></subdivision></division><division affected.by.uncommenced="0" guid="_aec9c2b4-5e14-4927-bdc5-a34963203dd0" id="ch.4-pt.2-div.7"><no>Division 7</no><heading guid="_98f686d1-8859-4231-a874-8408816431d6" id="ch.4-pt.2-div.7-he">Ministerial review of pipeline licence conditions</heading><clause affected.by.uncommenced="0" guid="_9190f3eb-5813-4a36-b4a0-2ff3710adfe3" id="sec.433" provision.type="other" spent.amends="0"><no>433</no><heading guid="_e21093ef-a3a2-4be6-b48a-11bb5b1ae12d" id="sec.433-he">Application of <intref check="valid" refid="ch.4-pt.2-div.7" target.guid="_aec9c2b4-5e14-4927-bdc5-a34963203dd0">div 7</intref></heading><block><txt break.before="1">This division applies only if a pipeline licence states a review day.</txt></block></clause><clause affected.by.uncommenced="0" guid="_35d66217-c506-4cff-ae9f-826d8be1adf1" id="sec.434" provision.type="other" spent.amends="0"><no>434</no><heading guid="_818c1f7e-8305-495e-9f1a-f0cef4f99e18" id="sec.434-he">Power to review licence</heading><subclause affected.by.uncommenced="0" guid="_ae17b1a7-80cd-4e37-ad3e-70d50ef27490" id="sec.434-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may, by complying with <intref check="valid" refid="sec.435" target.guid="_b55d3a03-b6eb-412e-9b81-584af52f7b7b">sections 435</intref> and <intref check="valid" refid="sec.436" target.guid="_0102bd70-a70b-4f2d-8a1b-d8fbb32586d2">436</intref>, amend the pipeline licence if satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8cc052c7-4514-41ba-baa1-4dbf6b17073a" id="sec.434-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the conditions of the licence—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2198cbfc-686d-4082-801b-b8719fc112a6" id="sec.434-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">are no longer appropriate; or</txt></block></li><li guid="_31c08833-6828-49d7-86aa-c38d6dcd040d" id="sec.434-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">do not make provision, or sufficient provision, about a matter; and</txt></block></li></list></block></li><li guid="_9c1b25d0-f77d-4181-a6f4-c9da7bf56e0a" id="sec.434-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the amendment is necessary or desirable.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c54e3eff-e819-4892-892a-f69516b8ca0e" id="sec.434-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the licence can not be amended in a way that is inconsistent with the mandatory conditions for pipeline licences.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_90009e91-91f8-4f9f-83ed-1f3da658072b" id="sec.434-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">This section does not limit the power to amend the licence under another provision of this Act.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b55d3a03-b6eb-412e-9b81-584af52f7b7b" id="sec.435" provision.type="other" spent.amends="0"><no>435</no><heading guid="_486ee7ea-9b16-4f94-8f08-9f0b53bfcbc3" id="sec.435-he">Notice of proposed amendment</heading><subclause affected.by.uncommenced="0" guid="_c900a59c-ce1d-44f1-8b07-d960a0b81096" id="sec.435-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister must give the pipeline licence holder a notice stating each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_59f9be90-3a8e-4eb7-b3d2-13ca3316becb" id="sec.435-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the proposed amendment;</txt></block></li><li guid="_26232f0f-5272-4ed7-ae2d-2699e8a69707" id="sec.435-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the conditions of the licence that the Minister considers are no longer appropriate or the matter about which the conditions do not make provision, or sufficient provision;</txt></block></li><li guid="_37c0ca2a-06d3-4816-bb6f-2aeff313fea3" id="sec.435-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">reasons why the Minister considers the amendment to be necessary or desirable;</txt></block></li><li guid="_e6deb26c-0ffe-4dd9-a769-b4eeda7a7bec" id="sec.435-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">that the holder may, within a stated reasonable period, lodge submissions about the proposed amendment.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_eb2a0b8d-2dd2-403b-b56b-e7e8db50efbe" id="sec.435-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The stated period must not end before 20 business days after the notice is given.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0102bd70-a70b-4f2d-8a1b-d8fbb32586d2" id="sec.436" provision.type="other" spent.amends="0"><no>436</no><heading guid="_48501685-e645-42aa-8ea1-4e6265a847fe" id="sec.436-he">Decision on proposed amendment</heading><subclause affected.by.uncommenced="0" guid="_e549e474-887f-4d46-9d66-4f8911283a25" id="sec.436-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Before deciding the proposed amendment, any submissions lodged within the period stated in the notice given under <intref check="valid" refid="sec.435" target.guid="_b55d3a03-b6eb-412e-9b81-584af52f7b7b">section 435</intref> must be considered.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3e7903f9-76c6-4f56-bc2f-c10a90a467ee" id="sec.436-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If a decision is made not to make the proposed amendment, the holder must be given notice of the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b09a1c9e-7e90-4e27-99e9-3ad3505a8963" id="sec.436-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If, after considering the submissions, the Minister is still satisfied under <intref check="valid" refid="sec.434" target.guid="_35d66217-c506-4cff-ae9f-826d8be1adf1">section 434</intref><intref check="valid" refid="sec.434-ssec.1" target.guid="_ae17b1a7-80cd-4e37-ad3e-70d50ef27490">(1)</intref>, the amendment may be made.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4148bf00-19db-4cea-b2f2-8b32e937fe1e" id="sec.436-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">On deciding to make the amendment, the holder must be given an information notice about the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3ac979e2-d6f8-4d8f-add2-18632d8b13fe" id="sec.436-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The amendment takes effect on the end of the appeal period for the decision, or if a later day of effect stated in the notice, on the later day.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_fe739778-d31c-4a92-8fdf-bc165e2f0e00" id="ch.4-pt.2-div.8"><no>Division 8</no><heading guid="_8a166b83-4d91-472b-9fd9-250d4c20eff3" id="ch.4-pt.2-div.8-he">Miscellaneous provisions</heading><clause affected.by.uncommenced="0" guid="_a5b1a3ba-296f-4847-8caa-7dcba24c0c5c" id="sec.437" provision.type="other" spent.amends="0"><no>437</no><heading guid="_9ce18905-c17d-4fa7-938e-c2086a68fa8f" id="sec.437-he">Limitation of pipeline licence holder’s liability</heading><subclause affected.by.uncommenced="0" guid="_1092fe99-3809-4f03-b89c-a9672969063a" id="sec.437-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a person incurs a cost, damage or loss because of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ce2e9f59-658e-4770-9c90-53dd5b54bdd2" id="sec.437-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the partial or total failure of a pipeline licence holder to transport petroleum or fuel gas through a pipeline; or</txt></block></li><li guid="_77102e47-16ae-4b64-a8e6-d12810d562ef" id="sec.437-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">fuel gas not of the prescribed quality transported through a pipeline the subject of a pipeline licence.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_cea3edc4-a1af-474c-bfe9-c441c61bb81d" id="sec.437-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, this section does not apply to the extent to which liability for the cost, damage or loss is, under a contract, agreed between the person and the licence holder.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8d87559f-b8db-44eb-9aa3-40d4eef603b4" id="sec.437-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The licence holder is not civilly liable for the cost, damage or loss if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3962a557-592a-42de-9547-a6648f06fb3f" id="sec.437-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the failure, or the fuel gas being not of the prescribed quality, was caused by a circumstance beyond the holder’s control; and</txt></block></li><li guid="_48b68e1b-35cd-4055-af55-30c19ae6b567" id="sec.437-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder’s operation of the pipeline—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1d07963f-dd9c-45b7-8cea-5de1628967ce" id="sec.437-ssec.3-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">complied with this Act and the conditions of the licence; and</txt></block></li><li guid="_a37b7355-1637-4106-a793-9153b99b16d5" id="sec.437-ssec.3-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">was carried out in good faith and without negligence.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c2b64b1f-9340-4840-a1d2-60b1c6d77850" id="sec.437-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0"><intref check="valid" refid="sec.437-ssec.3" target.guid="_8d87559f-b8db-44eb-9aa3-40d4eef603b4">Subsection (3)</intref> does not limit <intref check="valid" refid="sec.7" target.guid="_84241f5b-0951-4c27-91d5-ce581fe257d2">section 7</intref><intref check="valid" refid="sec.7-ssec.3" target.guid="_6f8f31de-7f65-4ee9-961d-fa60e621a2d3">(3)</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_9f2ea47b-bff2-4ec7-9442-c6f5ef2fa5b9" id="sec.437A" provision.type="other" spent.amends="0"><no>437A</no><heading guid="_876e3768-9096-4c9e-a046-a72511074261" id="sec.437A-he">Creation of easement by registration</heading><subclause affected.by.uncommenced="0" guid="_0dddf891-cee6-44ab-ba0a-98f2d10da129" id="sec.437A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An easement over pipeline land or public land may be created for a pipeline licence holder by registering a document creating the easement under the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-081" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act"><name emphasis="yes">Land Act 1994</name></legref> or an instrument of easement under the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-011" target.version.series="d93aa9d4-b864-42f4-88c5-b51b98fee2e2" type="act"><name emphasis="yes">Land Title Act 1994</name></legref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_92b9ce70-a953-454d-b1f3-d918d626f0a4" id="sec.437A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.437A-ssec.1" target.guid="_0dddf891-cee6-44ab-ba0a-98f2d10da129">Subsection (1)</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1ff54bce-52cb-461d-9245-cb7d42f19a73" id="sec.437A-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">applies even though the easement is not attached to, or used or enjoyed with, other land; and</txt></block></li><li guid="_2b0ed513-27d3-429d-9010-6100941b734f" id="sec.437A-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is subject to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c36815f3-1a7b-4d87-b657-882e5970e791" id="sec.437A-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-081" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act"><name emphasis="yes">Land Act 1994</name></legref>, other than <intref check="valid" refid="sec.369" target.guid="_067d644e-0407-4258-8b64-736b5b2ef1ec">section 369</intref><intref check="invalid" refid="sec.369-ssec.2">(2)</intref>; and</txt></block></li><li guid="_90ed19a9-052d-45d1-bb1a-db6333d46675" id="sec.437A-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-011" target.version.series="d93aa9d4-b864-42f4-88c5-b51b98fee2e2" type="act"><name emphasis="yes">Land Title Act 1994</name></legref>, other than <intref check="valid" refid="sec.89" target.guid="_1fac292c-6b2a-4b7d-8121-6cdb3d12d269">section 89</intref><intref check="valid" refid="sec.89-ssec.2" target.guid="_680b61ac-38d0-468f-ad14-d2f25e77dde7">(2)</intref>.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3004f39e-1f3c-4f09-9a99-40cad706e6a0" id="sec.437A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The <legref check="valid" jurisd="QLD" target.doc.id="act-1994-081" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act"><name emphasis="yes">Land Act 1994</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.6" target.doc.id="act-1994-081" target.guid="_57b07e1e-1b63-4ee4-84cb-80e49dde3d77" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act">chapter 6</legref>, <legref check="valid" jurisd="QLD" refid="ch.6-pt.4" target.doc.id="act-1994-081" target.guid="_0abee19d-d3fa-4648-bae5-c8b936db7a55" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act">part 4</legref>, <legref check="invalid" jurisd="QLD" type="act">division 8</legref> or the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-011" target.version.series="d93aa9d4-b864-42f4-88c5-b51b98fee2e2" type="act"><name emphasis="yes">Land Title Act 1994</name></legref>, <legref check="valid" jurisd="QLD" refid="pt.6" target.doc.id="act-1994-011" target.guid="_dfcca875-3e64-4db2-97b0-fb877ccc612a" target.version.series="d93aa9d4-b864-42f4-88c5-b51b98fee2e2" type="act">part 6</legref>, <legref check="valid" jurisd="QLD" refid="pt.6-div.4" target.doc.id="act-1994-011" target.guid="_47f89e4c-5009-46b8-a362-4e090121b219" target.version.series="d93aa9d4-b864-42f4-88c5-b51b98fee2e2" type="act">division 4</legref> applies to the easement as if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_877fd0b0-4ad8-4a8a-a494-5bbe2ef801cf" id="sec.437A-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">it were a public utility easement; and</txt></block></li><li guid="_b29f0dc8-45cc-4b25-b905-9f53dcf3310f" id="sec.437A-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the pipeline licence holder were a public utility provider; and</txt></block></li><li guid="_eddc7d3e-aaec-443b-8b38-00c381b375aa" id="sec.437A-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the land is forest land—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9c41bb9d-1273-4cb5-9fda-1bf89dee3d15" id="sec.437A-ssec.3-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a reference in the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-081" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act"><name emphasis="yes">Land Act 1994</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.362" target.doc.id="act-1994-081" target.guid="_1866efb1-2989-49c9-9f8f-db23cefac6a0" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act">sections 362</legref><legref check="invalid" jurisd="QLD" type="act">(1)</legref>, <legref check="invalid" jurisd="QLD" refid="sec.362-ssec.363" target.doc.id="act-1994-081" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act">363</legref><legref check="invalid" jurisd="QLD" refid="sec.362-ssec.363-ssec.1" target.doc.id="act-1994-081" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act">(1)</legref><legref check="invalid" jurisd="QLD" refid="sec.362-ssec.363-ssec.1-para1.c" target.doc.id="act-1994-081" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act">(c)</legref> and <legref check="valid" jurisd="QLD" refid="sec.369A" target.doc.id="act-1994-081" target.guid="_ff25628a-b0fa-4370-b019-10978adf70fa" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act">369A</legref><legref check="invalid" jurisd="QLD" type="act">(1)</legref> to the Minister were a reference to the Minister administering the <legref check="valid" jurisd="QLD" target.doc.id="act-1959-058" target.version.series="05878269-0f72-4d60-b053-3f083a8d73ea" type="act"><name emphasis="yes">Forestry Act 1959</name></legref>, <legref check="valid" jurisd="QLD" refid="pt.4" target.doc.id="act-1959-058" target.guid="_3b932701-52bc-428b-abcd-b33eaf1d6f4c" target.version.series="05878269-0f72-4d60-b053-3f083a8d73ea" type="act">part 4</legref>; and</txt></block></li><li guid="_38c606e3-8c49-4cab-81d1-f9e6b7d04976" id="sec.437A-ssec.3-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the owner of the land were the chief executive of the department administering the <legref check="valid" jurisd="QLD" target.doc.id="act-1959-058" target.version.series="05878269-0f72-4d60-b053-3f083a8d73ea" type="act"><name emphasis="yes">Forestry Act 1959</name></legref>, <legref check="valid" jurisd="QLD" refid="pt.4" target.doc.id="act-1959-058" target.guid="_3b932701-52bc-428b-abcd-b33eaf1d6f4c" target.version.series="05878269-0f72-4d60-b053-3f083a8d73ea" type="act">part 4</legref>.</txt></block></li></list></block></li></list><note guid="_7751689f-5384-48fa-b206-6403058edb71" id="sec.437A-ssec.3-note" type="example"><heading guid="_37abab88-6fc1-4aa5-a945-3fc1febd73b9" id="sec.437A-ssec.3-note-he">Note—</heading><block><txt break.before="1">Under the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-081" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act"><name emphasis="yes">Land Act 1994</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.363" target.doc.id="act-1994-081" target.guid="_35a99084-c4e6-47c2-92fd-bff919284e68" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act">section 363</legref><legref check="invalid" jurisd="QLD" type="act">(4)</legref>, the owner of a reserve or of unallocated State land for the purpose of consenting to the creation of an easement is the State.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_98281a74-d2de-4e53-b5db-590bbb64a745" id="sec.437A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">This section applies despite the <legref check="valid" jurisd="QLD" target.doc.id="act-1959-058" target.version.series="05878269-0f72-4d60-b053-3f083a8d73ea" type="act"><name emphasis="yes">Forestry Act 1959</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.26" target.doc.id="act-1959-058" target.guid="_8f553678-bdb1-4ea0-aa3f-0a463ffe489e" target.version.series="05878269-0f72-4d60-b053-3f083a8d73ea" type="act">section 26</legref><legref check="invalid" jurisd="QLD" type="act">(1A)</legref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_28cd76ac-5519-4435-9ad1-d180565971af" id="sec.437A-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_a326bd03-3f58-4ec1-b77c-bf3c476d1b6c" id="sec.437A-ssec.5-def.forestland_"><txt break.before="1"><defterm guid="_edf89420-012b-4119-b277-f244f7e1fac9" id="sec.437A-ssec.5-def.forestland" type="definition">forest land</defterm> means land that is a State forest or timber reserve under the <legref check="valid" jurisd="QLD" target.doc.id="act-1959-058" target.version.series="05878269-0f72-4d60-b053-3f083a8d73ea" type="act"><name emphasis="yes">Forestry Act 1959</name></legref>.</txt></definition></deflist></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_161a7ee2-4cc4-427a-bd77-a79f60103831" id="ch.4-pt.3"><no>Part 3</no><heading guid="_73823d50-fe18-4fb5-82fe-8179b427c759" id="ch.4-pt.3-he">Petroleum facility licences</heading><note guid="_f5499af6-bbb7-40d1-936d-3074bfaeaedf" id="ch.4-pt.3-note" type="example"><heading guid="_c29c7bac-26ac-4eb7-a6b8-e012f2968a9f" id="ch.4-pt.3-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="sec.803" target.guid="_2c8d2aa3-d8dc-4b11-aff4-7fc962147fea">section 803</intref> for the restrictions on constructing or operating a petroleum facility.</txt></block></note><division affected.by.uncommenced="0" guid="_78989005-e672-405b-b4a7-ad3434135e3f" id="ch.4-pt.3-div.1"><no>Division 1</no><heading guid="_013bf84c-709e-4fa1-a66c-d145d55d4c84" id="ch.4-pt.3-div.1-he">Key authorised activities</heading><subdivision affected.by.uncommenced="0" guid="_03fd6616-6449-476a-8d45-5653b0e344b5" id="ch.4-pt.3-div.1-sdiv.1"><no>Subdivision 1</no><heading guid="_091137b7-93e2-44c4-8a88-2e94a0cd373e" id="ch.4-pt.3-div.1-sdiv.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_50d898d5-04a9-4168-9946-803ea4d1b400" id="sec.438" provision.type="other" spent.amends="0"><no>438</no><heading guid="_23b230d6-25d7-4b8e-a05f-ed7cf367eb89" id="sec.438-he">Operation of <intref check="valid" refid="ch.4-pt.3-div.1" target.guid="_78989005-e672-405b-b4a7-ad3434135e3f">div 1</intref></heading><subclause affected.by.uncommenced="0" guid="_5cb83841-9f77-49a8-9b92-80f271514e5d" id="sec.438-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This division provides for the key authorised activities for a petroleum facility licence.</txt><note guid="_9c5bef59-8aa7-4c3e-9ee9-8652a9d9a72f" id="sec.438-ssec.1-note" type="example"><heading guid="_0f6d6a61-0229-432c-977e-78e146df8cfb" id="sec.438-ssec.1-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_2ea17078-8880-4f2d-a8ed-fe24e0e608dc" id="sec.438-ssec.1-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">For other authorised activities, see <intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref>, <intref check="valid" refid="ch.5-pt.8" target.guid="_6fd5c183-bb2d-498f-bceb-5e0aff62d198">part 8</intref> and the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-2014-047" target.guid="_78e7ee55-dcff-4087-b0b9-13497e839af3" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">chapter 3</legref>, <legref check="valid" jurisd="QLD" refid="ch.3-pt.6" target.doc.id="act-2014-047" target.guid="_339874b3-31a0-4a0c-b3ab-87b69533dd35" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">part 6</legref>.</txt></block></li><li guid="_431b49b2-ed06-448a-999a-21098f86688b" id="sec.438-ssec.1-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">The carrying out of particular activities on particular land in a petroleum facility licence’s area may not be authorised following the taking of the land under a resumption law. See <intref check="valid" refid="sec.30AB" target.guid="_4abe0a1b-ba8f-40b0-b76e-1e1864fb56ff">section 30AB</intref>.</txt></block></li></list></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_ad600eb8-4f9f-44a8-8774-240f102e9365" id="sec.438-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The authorised activities may be carried out despite the rights of an owner or occupier of land on which they are exercised.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d33ee643-a647-483b-a43e-6c81a6c7daac" id="sec.438-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the carrying out of the authorised activities is subject to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f638e5b1-915d-4f89-b735-e145a9c98c30" id="sec.438-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0"><intref check="valid" refid="ch.4-pt.3-div.1-sdiv.2" target.guid="_25cee0f0-1a01-488b-a17f-a6bad2202eae">subdivision 2</intref>; and</txt></block></li><li guid="_1f081db7-91e2-48ed-954a-48790a8a1209" id="sec.438-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0"><intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref>; and</txt></block></li><li guid="_fcc38c26-e745-417b-84e2-92ede99529d4" id="sec.438-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the mandatory and other conditions of the licence; and</txt></block></li><li guid="_e4d96f98-1a7c-4c9a-8f15-cb102605cab1" id="sec.438-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">any exclusion or restriction provided for in the licence on the carrying out of the activities; and</txt></block></li><li guid="_adb2e41c-5361-4309-9f91-748402f2edb7" id="sec.438-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_9af73335-3c60-40ed-99ba-4d0f479b3f1d" id="sec.439" provision.type="other" spent.amends="0"><no>439</no><heading guid="_429770d1-6072-48c8-a8a9-263e777c8f5f" id="sec.439-he">What is <defterm guid="_af8fef9a-ddae-4dac-84fe-8b16199b582c" type="mention">petroleum facility land</defterm> for a petroleum facility licence</heading><subclause affected.by.uncommenced="0" guid="_4cf5acf5-3ede-47ac-b664-be55d1ab9206" id="sec.439-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0"><defterm guid="_06486d32-5511-4f39-8048-78535716d886" id="sec.439-def.Petroleumfacilityland" type="definition">Petroleum facility land</defterm>, for a petroleum facility licence, is land—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cca9172f-77df-4335-bf76-2539aed2f088" id="sec.439-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that the licence holder owns; or</txt></block></li><li guid="_8a6b4e3a-933c-4436-8e90-157c49ecf823" id="sec.439-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">over which the holder—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a8e6efdf-4231-47df-885e-e0cdf3e36ce0" id="sec.439-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">holds an appropriate easement for the construction or operation of the petroleum facility; or</txt></block></li><li guid="_06a9e7a3-668a-4769-88f9-1b93a1b16208" id="sec.439-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">has obtained the owner’s written permission to enter to construct or operate the petroleum facility; or</txt></block></li><li guid="_01ccf37b-1551-4cc6-a8c2-4ef107378ddf" id="sec.439-ssec.1-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">holds a <intref check="valid" refid="ch.4-pt.5" target.guid="_eab0c8dc-b6df-485f-877e-6a37095b8990">part 5</intref> permission to enter to construct or operate the petroleum facility.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_fef77d04-21f9-4170-ab4f-614e8d012861" id="sec.439-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">To remove any doubt, it is declared that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_695027fe-6150-4171-a529-cfda781e5d4c" id="sec.439-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the granting of a petroleum facility licence does not, of itself, create an easement for the construction or operation of the petroleum facility; and</txt></block></li><li guid="_1cb2f93c-82f9-4d30-a0f4-9c6341cfbd95" id="sec.439-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the giving of a waiver of entry notice under the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.42" target.doc.id="act-2014-047" target.guid="_18160985-7a04-4b7a-99a5-c89f94db72d2" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">section 42</legref> is not, of itself, a permission for <intref check="valid" refid="sec.439-ssec.1" target.guid="_4cf5acf5-3ede-47ac-b664-be55d1ab9206">subsection (1)</intref><intref check="valid" refid="sec.439-ssec.1-para1.b" target.guid="_8a6b4e3a-933c-4436-8e90-157c49ecf823">(b)</intref><intref check="valid" refid="sec.439-ssec.1-para1.b-para2.ii" target.guid="_06a9e7a3-668a-4769-88f9-1b93a1b16208">(ii)</intref>.</txt></block></li></list></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_25cee0f0-1a01-488b-a17f-a6bad2202eae" id="ch.4-pt.3-div.1-sdiv.2"><no>Subdivision 2</no><heading guid="_073a6d6c-114e-415e-8cad-a18c4b300b2e" id="ch.4-pt.3-div.1-sdiv.2-he">General restriction on authorised activities</heading><clause affected.by.uncommenced="0" change="delReplace" guid="_552bff25-cb12-496c-8d63-c1c161996264-del" id="sec.440-del" provision.type="other" spent.amends="0"><no>440</no><heading guid="_3fec718f-576d-4103-b497-0bf8015a7491-del" id="sec.440-he-del">Restriction if there is an existing mining lease</heading><block><txt break.before="1">If land in the area of a petroleum facility licence is also in the area of a mining lease and the mining lease was granted before the licence, an authorised activity for the licence may be carried out on the land only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7ef4f8d8-bff0-437f-9826-88aa41a58a62-del" id="sec.440-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">the mining lease holder has agreed in writing to the carrying out of the activity; and</txt></block></li><li guid="_8f70014e-7184-4049-b440-4a2632fb1727-del" id="sec.440-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">a copy of the agreement has been lodged; and</txt></block></li><li guid="_ed5f63aa-a187-47af-bace-fd8472c1be24-del" id="sec.440-para1.c-del" provision.type="other"><no>(c)</no><block><txt break.before="0">the agreement is still in force.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" change="insReplace" guid="_6326dd04-b2a8-4b98-92e5-311804ab78fa" id="sec.440" provision.type="other" spent.amends="0"><no>440 </no><heading guid="_45d7f500-053f-4714-b903-436fb3c125c5" id="sec.440-he">Restriction if there is an existing mining lease</heading><subclause affected.by.uncommenced="0" guid="_eace53bb-d59a-46f8-9e91-f4c202518105" id="sec.440-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if land in the area of a petroleum facility licence is also in the area of a mining lease (the <defterm guid="_eb971cfe-c38a-4114-9b35-ad55c292b862" id="sec.440-def.existinglease" type="definition">existing lease</defterm>) that was granted before the licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0fffa5f6-d759-42bc-bf95-111b5a703a60" id="sec.440-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The petroleum facility licence holder may carry out an authorised activity for the licence on land within the area of the existing lease only if— </txt><list number.type="manual" unnumbered.indent="0"><li guid="_650adecb-8f86-4d94-8003-6397735b8ec0" id="sec.440-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">both of the following apply—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f324c141-554b-4d45-968a-fc47df46fc27" id="sec.440-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the existing lease holder has agreed in writing to the carrying out of the activity; </txt></block></li><li guid="_a8d50ba5-afc9-43b1-9173-a32698c420c0" id="sec.440-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the petroleum facility licence holder has given a copy of the agreement mentioned in subparagraph (i) to the chief executive; or </txt></block></li></list></block></li><li guid="_6441856f-6301-4aae-a09b-91e981eb5e3c" id="sec.440-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">both of the following apply—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b4a3901f-508d-4a82-96f1-9922a31935aa" id="sec.440-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">carrying out the activity is consistent with an agreed co-existence plan; </txt></block></li><li guid="_647f76b9-b89e-4e5f-a7c2-42a34aaf9272" id="sec.440-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the petroleum facility licence holder has given a notice to the chief executive stating the following— </txt><list number.type="manual" unnumbered.indent="0"><li guid="_25d5ed4b-48f8-451a-a53a-ba68e05ef0e2" id="sec.440-ssec.2-para1.b-para2.ii-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">that the plan is in place;</txt></block></li><li guid="_6ab46151-e24b-4f82-8fa4-37dd798c40c0" id="sec.440-ssec.2-para1.b-para2.ii-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">the period for which the plan has effect;</txt></block></li><li guid="_2fe0a98f-eddf-4d99-8384-78fd9dcf125c" id="sec.440-ssec.2-para1.b-para2.ii-para3.C" provision.type="other"><no>(C)</no><block><txt break.before="0">other information prescribed by regulation.</txt></block></li></list></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_18e24a28-24db-45ba-9eac-c0f506b7493f" id="sec.440-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">An agreed co-existence plan must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9d906517-a491-4adf-8fde-da62be60d730" id="sec.440-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">identify the parties to the plan; and</txt></block></li><li guid="_3cc10667-e2dc-4495-83e6-34386d4c791c" id="sec.440-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">set out an overview of the activities proposed to be carried out in the area mentioned in subsection (1), including the location of the activities and when they will start; and</txt></block></li><li guid="_2cf9a2ef-04ea-4cc5-9bb3-5e8920b3f51a" id="sec.440-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">set out how the activities mentioned in paragraph (b) will comply with mining safety legislation; and</txt></block></li><li guid="_836825d5-7944-48d6-850e-516e6724f886" id="sec.440-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">state how the activities mentioned in paragraph (b) optimise the development and use of the State’s resources; and</txt></block></li><li guid="_95b29f21-0938-4c7f-af6f-a5fd25c92ee5" id="sec.440-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">state whether any monetary or non-monetary compensation is to be given under the plan; and</txt></block></li><li guid="_4f11201b-804a-4cc6-b5e8-b72fea87dd1b" id="sec.440-ssec.3-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">state the period for which the plan is to have effect; and</txt></block></li><li guid="_4ef634f4-36d1-4ff0-b9e2-1d1645c8f8b6" id="sec.440-ssec.3-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">include any other information prescribed by regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1d3e31c2-2066-4a7b-9d43-2d5fe294f16d" id="sec.440-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The petroleum facility licence holder may give the existing lease holder a notice (the <defterm guid="_28d24319-370f-4ad4-bd24-3ebe87242a4e" id="sec.440-def.negotiationnotice" type="definition">negotiation notice</defterm>) that the petroleum facility licence holder wishes to negotiate a co-existence plan with the existing lease holder.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2aebda7a-7b8e-415f-87b0-7e7425d0f5e9" id="sec.440-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The negotiation notice is invalid if it does not comply with the prescribed requirements for the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8c74bbc4-7ba8-40f7-a44e-0386ac99c794" id="sec.440-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The petroleum facility licence holder and the existing lease holder must negotiate in good faith and use all reasonable endeavours to agree on a co-existence plan.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a30a4423-fe16-47a3-8683-c03cd438b1ad" id="sec.440-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">If the petroleum facility licence holder and the existing lease holder can not agree on a co-existence plan within 3 months after the giving of the negotiation notice, the petroleum facility licence holder may apply for arbitration of the dispute.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_63475a55-0302-4a73-8547-f3a62345f854" id="sec.440-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">Despite subsection (7), the petroleum facility licence holder and the existing lease holder may jointly apply for arbitration of the dispute at any time.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_18d9518b-41dd-492e-b4df-cd91db6fa9f1" id="sec.440-ssec.9" provision.type="other"><no>(9)</no><block><txt break.before="0">It is a condition of both the petroleum facility licence and the existing lease that the holder must comply with each agreed co-existence plan that applies to the holder.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8cd5e337-1f41-4173-9b91-6ed7423df343" id="sec.440-ssec.10" provision.type="other"><no>(10)</no><block><txt break.before="0">In this section—</txt><definition affected.by.uncommenced="0" guid="_7e2d4baa-b344-4e80-85de-72c1cf8e327a" id="sec.440-ssec.10-def.agreedcoexistenceplan_"><txt break.before="1"><defterm guid="_e8ae45ed-4f40-4c1d-a96a-e21aba178742" id="sec.440-ssec.10-def.agreedcoexistenceplan" type="definition">agreed co-existence plan</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_81fe8a70-ea40-4990-b31d-747a6668723a" id="sec.440-ssec.10-def.agreedcoexistenceplan-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if an agreed co-existence plan is agreed on under subsection (6)—the agreed co-existence plan; or</txt></block></li><li guid="_cc8a74f2-9e0d-481b-9103-37e595599f47" id="sec.440-ssec.10-def.agreedcoexistenceplan-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if an agreed co-existence plan is amended by the holders of the petroleum facility licence and the existing mining lease—the agreed co-existence plan as amended; or</txt></block></li><li guid="_48837b39-aada-49a7-9262-a74c3d9945e6" id="sec.440-ssec.10-def.agreedcoexistenceplan-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if an agreed co-existence plan is arbitrated as an agreed co-existence plan under the Common Provisions Act, chapter 5, part 3—the agreed co-existence plan as arbitrated.</txt></block></li></list></definition></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_1aff599c-dc96-4ed8-8817-e0496c86101b" id="ch.4-pt.3-div.1-sdiv.3"><no>Subdivision 3</no><heading guid="_75b92e9c-af0e-4a54-9cdf-fbf1b955a879" id="ch.4-pt.3-div.1-sdiv.3-he">Petroleum facility construction and operation</heading><clause affected.by.uncommenced="0" guid="_8ebc84bd-7950-43e0-90ff-98bea86e1b1d" id="sec.441" provision.type="other" spent.amends="0"><no>441</no><heading guid="_6d2e5af6-d9f4-40b6-b1ff-dde1566acb4f" id="sec.441-he">Construction and operation of petroleum facility</heading><subclause affected.by.uncommenced="0" guid="_18402255-0534-440e-a632-9674ad2f792a" id="sec.441-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The holder of a petroleum facility licence may, on the petroleum facility land for the licence, construct or operate the petroleum facility.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b19401e8-eb33-4c0a-b32a-1e94ba6663d3" id="sec.441-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if native title exists in relation to the petroleum facility land, the holder must have or hold an interest or permission mentioned in <intref check="valid" refid="sec.439" target.guid="_9af73335-3c60-40ed-99ba-4d0f479b3f1d">section 439</intref><intref check="valid" refid="sec.439-ssec.1" target.guid="_4cf5acf5-3ede-47ac-b664-be55d1ab9206">(1)</intref><intref check="valid" refid="sec.439-ssec.1-para1.b" target.guid="_8a6b4e3a-933c-4436-8e90-157c49ecf823">(b)</intref> for the native title rights and interests.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1a2bd307-2019-4463-aba3-ca7efe8db2c2" id="sec.441-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">To remove any doubt, it is declared that the mere grant of the licence does not, of itself, authorise the construction or operation of the petroleum facility on other land in the area of the licence.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_fb266336-7dd4-4f18-bdb3-54760f449e65" id="sec.442" provision.type="other" spent.amends="0"><no>442</no><heading guid="_f9d77714-4afb-4dff-99c4-d5665cdc8964" id="sec.442-he">Incidental activities</heading><subclause affected.by.uncommenced="0" guid="_f8ce916e-cda7-4db0-a07b-edd34b92ea02" id="sec.442-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, under <intref check="valid" refid="sec.441" target.guid="_8ebc84bd-7950-43e0-90ff-98bea86e1b1d">section 441</intref>, a petroleum facility licence holder has the right to construct or operate a petroleum facility.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_66d75b79-bec9-4f02-91c4-09db8809ad87" id="sec.442-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The holder may carry out an activity (an <defterm guid="_39cf43f4-0873-490b-ac3f-819e83910132" id="sec.442-def.incidentalactivity" type="definition">incidental activity</defterm>) in the area of the licence if carrying out the activity is reasonably necessary for the construction or operation.</txt><note guid="_9f11c0b5-5fd8-44c9-86ab-efe91c5b8da5" id="sec.442-ssec.2-note" type="example"><heading guid="_de58bea8-9180-4745-a135-b5a51dc7f3c6" id="sec.442-ssec.2-note-he">Examples of incidental activities—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_45455237-dcf0-45a9-8be7-c4c941f8ea44" id="sec.442-ssec.2-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">constructing or operating plant or works, including, for example, bridges, powerlines, roads, trenches and tunnels</txt></block></li><li guid="_1fc3d05c-bca4-4760-9d6c-90c35228afb0" id="sec.442-ssec.2-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">constructing or using temporary structures or structures of an industrial or technical nature, including, for example, mobile and temporary camps</txt></block></li><li guid="_55418208-0036-4530-891f-4766e94a53c9" id="sec.442-ssec.2-note-para1.3" provision.type="other"><no>3</no><block><txt break.before="0">removing vegetation for, or for the safety of, the construction or operation of the petroleum facility</txt></block></li></list></block></note><note guid="_0939a009-5831-4d4f-ba7c-b1fec606752c" id="sec.442-ssec.2-note-oc.2" type="example"><heading guid="_d2b771c4-a683-42bc-af5e-c81ef6d57e25" id="sec.442-ssec.2-note-oc.2-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref> (Common petroleum authority provisions) and <intref check="valid" refid="sec.20" target.guid="_746e989f-44f2-4d9b-9550-13495b74b131">section 20</intref> (What are the <defterm guid="_2b9a48d7-1576-4d08-a0a3-f11b76757880" type="mention">conditions</defterm> of a petroleum authority).</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_4a47a25f-edb5-48d6-881d-7e0800aa440e" id="sec.442-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, constructing or using a structure, other than a temporary structure, for office or residential accommodation is not an incidental activity.</txt><note guid="_61a68af2-a055-4a10-a3b9-a1de9f7d0492" id="sec.442-ssec.3-note" type="example"><heading guid="_b0bbd64e-3a1b-448e-b9b9-f3d45d30b5b3" id="sec.442-ssec.3-note-he">Note—</heading><block><txt break.before="1">For development generally, see the <legref check="valid" jurisd="QLD" target.doc.id="act-2016-025" target.version.series="d4a7e9d3-f73d-48a3-9459-9be0b66a1c15" type="act"><name emphasis="yes">Planning Act 2016</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-2016-025" target.guid="_42229283-823c-4a26-99f7-756eab8a5578" target.version.series="d4a7e9d3-f73d-48a3-9459-9be0b66a1c15" type="act">chapter 3</legref>.</txt></block></note></block></subclause></clause></subdivision></division><division affected.by.uncommenced="0" guid="_5bbfe1e5-2a02-4bf3-ad0b-f279dde54c4c" id="ch.4-pt.3-div.1A"><no>Division 1A</no><heading guid="_a024f53f-870b-4ef3-9b88-f2eed8dc19ca" id="ch.4-pt.3-div.1A-he">Petroleum facility licence not required in relation to particular facilities</heading><clause affected.by.uncommenced="0" guid="_9e4d8db4-fcab-42ba-919d-05f8192f21d1" id="sec.442A" provision.type="other" spent.amends="0"><no>442A</no><heading guid="_88325a54-955d-4c40-9f01-0a5d82d45d7b" id="sec.442A-he">When petroleum facility licence not required</heading><block><txt break.before="1">A petroleum facility licence is not required for— </txt><list number.type="manual" unnumbered.indent="0"><li guid="_3c65bae3-a4c8-41c8-a74b-eb30c642cbc8" id="sec.442A-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a facility constructed or operated under—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_38ce53a0-52fd-495a-8996-6a34c58dad23" id="sec.442A-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1961-003" target.version.series="73916396-889f-4008-a74f-393e76e39ff8" type="act"><name emphasis="yes">Amoco Australia Pty. Limited Agreement Act 1961</name></legref>; or</txt></block></li><li guid="_8421bc8a-1fa1-49bd-a1d6-ff15a6716b3d" id="sec.442A-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1964-036" target.version.series="d5a70d02-a779-48a2-b4af-595493fca218" type="act"><name emphasis="yes">Ampol Refineries Limited Agreement Act 1964</name></legref>; or</txt></block></li></list></block></li><li guid="_f45a3286-1ae4-48a3-b149-8526020638d5" id="sec.442A-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the construction or operation of a petroleum facility for the distillation, processing, refining, storage or transport of petroleum authorised under—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_312223b6-7974-48f1-ac5c-339853bfea21" id="sec.442A-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0"><intref check="valid" refid="sec.33" target.guid="_40d20d00-5908-4940-8068-947039fa8c08">section 33</intref>; or</txt></block></li><li guid="_8a03652c-eb81-467f-8df1-c71ca2d03879" id="sec.442A-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a petroleum lease or pipeline licence under this Act; or</txt></block></li><li guid="_8568ef5f-5c40-48e6-b237-7716bb9651a6" id="sec.442A-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> petroleum tenure.</txt></block></li></list></block></li></list></block></clause></division><division affected.by.uncommenced="0" guid="_580953f4-c0ac-4162-aba9-740f3c2299dd" id="ch.4-pt.3-div.2"><no>Division 2</no><heading guid="_f8099259-26ca-4eb8-b7f2-3e07772bc76f" id="ch.4-pt.3-div.2-he">Obtaining petroleum facility licence</heading><subdivision affected.by.uncommenced="0" guid="_d3a1d851-d501-4647-b538-cee524ca3e06" id="ch.4-pt.3-div.2-sdiv.1"><no>Subdivision 1</no><heading guid="_1a86148c-4879-4fb1-a732-a29f7e14830a" id="ch.4-pt.3-div.2-sdiv.1-he">Applying for petroleum facility licence</heading><clause affected.by.uncommenced="0" guid="_c4f12b6a-ca1b-4c25-8daa-d5aacdf48e27" id="sec.443" provision.type="other" spent.amends="0"><no>443</no><heading guid="_11dc3803-78e4-4a8d-b640-1ae5947e4ff2" id="sec.443-he">Who may apply</heading><subclause affected.by.uncommenced="0" guid="_cab8469f-07f9-4a03-bc63-66f99aabb8e6" id="sec.443-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person may apply for a petroleum facility licence for a petroleum facility or proposed petroleum facility.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b25fa931-7feb-4f1f-b418-9e228c38cb5a" id="sec.443-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if the facility is partly on the area of a petroleum lease and partly on other land, a person can not apply for a petroleum facility licence in relation to the facility unless the application is for the whole of the facility.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d5433bff-3e14-44d7-97b5-03e2efc93884" id="sec.445" provision.type="other" spent.amends="0"><no>445</no><heading guid="_4050d7fa-6628-4b39-9dfd-293013752701" id="sec.445-he">Requirements for making application</heading><block><txt break.before="1">The application must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ffee7bd9-78e2-4dc4-9247-1c6a4f77d134" id="sec.445-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li guid="_f6783325-2ed3-40e7-afe4-23d4ac49a761" id="sec.445-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_49739983-5a61-4eed-b4a5-c2f418880ae3" id="sec.445-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the petroleum facility, or proposed petroleum facility, the subject of the application;</txt></block></li><li guid="_68a28bf5-bea9-4220-afc6-9ff80244e274" id="sec.445-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a description of the proposed petroleum facility land for the licence;</txt></block></li><li guid="_4093b6c3-4593-4d09-8fee-0528bc6754ea" id="sec.445-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the precise location of the facility, or proposed petroleum facility on the land;</txt></block></li><li guid="_9016fdde-2a9a-4c32-bf54-da9913a6cc9f" id="sec.445-para1.b-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">the purpose of the facility;</txt></block></li><li guid="_08684a8a-f197-425a-a356-1abc2eabaf0c" id="sec.445-para1.b-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">for a proposed facility—a proposed day for the completion of the construction of the facility;</txt></block></li><li guid="_b5ae49b3-2fca-4a09-bf8d-2ff71e0fb1c4" id="sec.445-para1.b-para2.vi" provision.type="other"><no>(vi)</no><block><txt break.before="0">the extent and nature of activities proposed to be carried out under the licence; and</txt></block></li></list></block></li><li guid="_50aa7349-17aa-444b-b155-c8dbdf131282" id="sec.445-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the area of the licence is, or is included in, the area of another petroleum authority or a mining interest—identify possible impacts of authorised activities under the licence on authorised activities under the other petroleum authority or on mining under the mining interest; and</txt></block></li><li guid="_bbfa26da-3f70-4930-9261-6fd2b3409db6" id="sec.445-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">address the criteria mentioned in <intref check="valid" refid="sec.448" target.guid="_acb5bbd5-5f8c-4ae8-b482-07238d5e8c71">section 448</intref><intref check="valid" refid="sec.448-para1.a" target.guid="_b31de8af-ba80-4d40-81f6-17650fb63349">(a)</intref>; and</txt></block></li><li guid="_36543e3a-6a2b-40ae-9d79-0f275933f73b" id="sec.445-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">be accompanied by the fee prescribed under a regulation.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_165c2769-b1a0-49e6-aad1-47df9072d8c9" id="sec.445A" provision.type="other" spent.amends="0"><no>445A</no><heading guid="_130e3101-20df-4621-a7ff-446a528cfba2" id="sec.445A-he">Notice of application to relevant local government</heading><subclause affected.by.uncommenced="0" guid="_f156b63d-2aef-4881-8e57-17284d2352b9" id="sec.445A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The applicant must, within 10 business days after making the application, give each relevant local government a notice stating the application details under <intref check="valid" refid="sec.445" target.guid="_d5433bff-3e14-44d7-97b5-03e2efc93884">section 445</intref><intref check="valid" refid="sec.445-para1.b" target.guid="_f6783325-2ed3-40e7-afe4-23d4ac49a761">(b)</intref> for the proposed application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0f4f3db4-21cc-438e-b9d8-c2aed445cd0c" id="sec.445A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If <intref check="valid" refid="sec.445A-ssec.1" target.guid="_f156b63d-2aef-4881-8e57-17284d2352b9">subsection (1)</intref> is not complied with, the application lapses.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c0c3023d-91e9-4175-aaf4-fbf5873ec990" id="sec.445A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">To remove any doubt, it is declared that the lapsing of the application under <intref check="valid" refid="sec.445A-ssec.2" target.guid="_0f4f3db4-21cc-438e-b9d8-c2aed445cd0c">subsection (2)</intref> does not of itself prevent the former applicant making another petroleum facility licence application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bd24149e-9a7c-4b9d-95c5-f5eaf735ce72" id="sec.445A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_e5fa81b8-810a-4fac-8b50-aad48221bd0f" id="sec.445A-ssec.4-def.relevantlocalgovernment_"><txt break.before="1"><defterm guid="_3cfc2961-a99d-402c-baf0-a65886fc6ad5" id="sec.445A-ssec.4-def.relevantlocalgovernment" type="definition">relevant local government</defterm> means a local government in whose local government area the petroleum facility is proposed to be constructed under the licence.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_2d8f7d93-be4c-4196-936e-9739afd5bede" id="sec.445B" provision.type="other" spent.amends="0"><no>445B </no><heading guid="_eedb6261-4ab1-4367-a95d-848cef677ff6" id="sec.445B-he">Rejection of application if applicant disqualified</heading><subclause affected.by.uncommenced="0" guid="_be694405-2036-4701-9cc9-5e3ba6d8f074" id="sec.445B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister must reject an application for a petroleum facility licence if the Minister decides the applicant is disqualified under the Common Provisions Act, chapter 7 from being granted the petroleum facility licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3e353b04-eeee-4feb-8146-465865adfe1a" id="sec.445B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On rejection of the application, the Minister must give the applicant a notice about the decision.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_2ea52bd2-5d1d-406b-93fb-d76f6e7d5caf" id="ch.4-pt.3-div.2-sdiv.2"><no>Subdivision 2</no><heading guid="_40170403-e769-4be4-9ce8-cdc8b09ca3dc" id="ch.4-pt.3-div.2-sdiv.2-he">Deciding petroleum facility licence application</heading><clause affected.by.uncommenced="0" guid="_88b1869b-0b76-4e0b-aaee-6b2a067b73e2" id="sec.446" provision.type="other" spent.amends="0"><no>446</no><heading guid="_8437c02f-4773-42f9-8a0f-cb0863671b40" id="sec.446-he">Deciding whether to grant licence</heading><subclause affected.by.uncommenced="0" guid="_56089bc7-1bf6-44f0-afb6-8a9f0c1d5a68" id="sec.446-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ba1a4dc7-01ab-433e-b3be-e8f4965a5db5" id="sec.446-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">subject to <intref check="valid" refid="sec.447A" target.guid="_ab5c76cf-5329-49aa-8c2b-aca1f01523f9">section 447A</intref>, decide to grant the applicant a petroleum facility licence only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cf58c50d-82b9-40b6-8b78-9f242a732541" id="sec.446-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the applicant is an eligible person; and</txt></block></li><li guid="_6db9c73a-de9d-44a9-8cac-9b8de6557c76" id="sec.446-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a relevant environmental authority for the licence has been issued; and</txt></block></li></list></block></li><li guid="_00fd2623-50aa-455e-862c-0572aa71d453" id="sec.446-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">before granting the licence, require the applicant to do all or any of the following within a stated reasonable period—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5828680d-d5e5-4f1d-b7dd-37ba8208101e" id="sec.446-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">pay the licence fee for the first year of the proposed licence;</txt></block></li><li guid="_fa61cb79-eef9-4f3b-9f78-c74239d720bc" id="sec.446-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">give, under <intref check="valid" refid="sec.488" target.guid="_13f8de44-15a4-4a47-a9af-6464bc374dda">section 488</intref>, security for the licence.</txt></block></li></list></block></li></list><note guid="_a0742a50-8352-4059-acb9-b1223b2ea677" id="sec.446-ssec.1-note" type="example"><heading guid="_2f780ff0-16f7-4861-92d2-7d90f78562e5" id="sec.446-ssec.1-note-he">Note—</heading><block><txt break.before="1">If the application relates to acquired land, see also <intref check="valid" refid="sec.30AC" target.guid="_9f663574-cdda-4e64-9f8f-6c6102041022">section 30AC</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_a4df0ffc-515b-4669-95cd-e458f81d0f47" id="sec.446-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the applicant does not comply with a requirement under <intref check="valid" refid="sec.446-ssec.1" target.guid="_56089bc7-1bf6-44f0-afb6-8a9f0c1d5a68">subsection (1)</intref>, the Minister may refuse to grant the licence.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8b75747b-1e26-4e2a-96f5-f1c3fd918b78" id="sec.447" provision.type="other" spent.amends="0"><no>447</no><heading guid="_35fb887a-6f37-4c5b-8644-7d5956c901fe" id="sec.447-he">Provisions of licence</heading><subclause affected.by.uncommenced="0" guid="_d8d13c22-3b07-477a-843d-c4377a92ac4b" id="sec.447-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Each petroleum facility licence must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9e1fe405-73eb-425f-9449-36cfb2a8460f" id="sec.447-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">its term and area; and</txt></block></li><li guid="_92b83b1a-c743-4a2b-a45f-3cee0e52815d" id="sec.447-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the facility the subject of the licence has not already been constructed—a day by which its holder must complete construction of the facility.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_71be1f6a-a20f-4e89-92e9-5809eebe8e14" id="sec.447-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The term must end no later than 30 years after the licence takes effect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_00750dcf-5c01-4f5e-919b-0e769fb4366a" id="sec.447-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The area of the licence must be the area that the Minister considers is the minimum area needed to adequately carry out the purpose of the petroleum facility or proposed petroleum facility.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_702f57ff-9830-4e64-b68e-8dfd73774bd8" id="sec.447-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The licence may also state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ac55e1f7-9266-4e34-94bd-07af01d70a3a" id="sec.447-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">conditions or other provisions of the licence, other than conditions or provisions that are—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c1769a99-52db-4040-ac8a-cc6b478a85df" id="sec.447-ssec.4-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">inconsistent with the mandatory conditions for petroleum facility licences; or</txt><note guid="_fdbfd22c-9797-4cbf-9ea0-35eee6a9abd2" id="sec.447-ssec.4-para1.a-para2.i-note" type="example"><heading guid="_96b05bed-4d35-4c76-93b5-d5e6ae6d47cc" id="sec.447-ssec.4-para1.a-para2.i-note-he">Note—</heading><block><txt break.before="1">For mandatory conditions, see <intref check="valid" refid="ch.4-pt.3-div.3" target.guid="_031245f7-938a-42ea-86e0-dd91f21b1fc0">division 3</intref> (Key mandatory conditions for petroleum facility licences) and <intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref>, <intref check="valid" refid="ch.5-pt.8" target.guid="_6fd5c183-bb2d-498f-bceb-5e0aff62d198">part 8</intref> (General provisions for conditions and authorised activities).</txt></block></note></block></li><li guid="_bdb62372-258c-43e3-ad99-3aabe57db4fe" id="sec.447-ssec.4-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the same as, or substantially the same as, or inconsistent with, any relevant environmental condition for the licence; and</txt></block></li></list></block></li><li guid="_fb5628a8-9d58-4893-b9ff-0d0f33c82b29" id="sec.447-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the day it takes effect.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ee605fee-3d47-402f-9058-29fb3f156906" id="sec.447-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">However, the provisions of the licence may exclude or restrict the carrying out of an authorised activity for the licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_518078dc-9174-4610-b19c-dab3dfc59beb" id="sec.447-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">If no day of effect is stated, the licence takes effect on the day it is granted.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7435534d-9acf-465e-9fd1-1fef120ae740" id="sec.447-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">This section applies subject to <intref check="valid" refid="sec.447A" target.guid="_ab5c76cf-5329-49aa-8c2b-aca1f01523f9">section 447A</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_ab5c76cf-5329-49aa-8c2b-aca1f01523f9" id="sec.447A" provision.type="other" spent.amends="0"><no>447A</no><heading guid="_6cbae75b-046d-4b7e-87f1-9ed1d3c77b58" id="sec.447A-he">Provisions about grant and conditions of licence for coordinated project</heading><subclause affected.by.uncommenced="0" guid="_692d3e71-785e-46ef-9556-26dfa45918fa" id="sec.447A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a petroleum facility licence or proposed petroleum facility licence is for a coordinated project.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_97d49bfe-a97f-41d6-8516-07b85294f628" id="sec.447A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister must not grant the licence until the Minister has been given the Coordinator-General’s report for the project.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_74e70c7d-33dc-46a9-9d62-4878b4452fc6" id="sec.447A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Any Coordinator-General’s conditions for the licence must be stated in the licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_de28cf65-678e-4961-a55d-0279220f7589" id="sec.447A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Any other condition of the licence stated under <intref check="valid" refid="sec.447" target.guid="_8b75747b-1e26-4e2a-96f5-f1c3fd918b78">section 447</intref> must not be inconsistent with the Coordinator-General’s conditions.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_59bbb4dc-5ec5-433e-b384-3c2f4a171f05" id="sec.447A-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If a mandatory condition for petroleum facility licences conflicts with any of the Coordinator-General’s conditions, the Coordinator-General’s condition prevails to the extent of the inconsistency.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_acb5bbd5-5f8c-4ae8-b482-07238d5e8c71" id="sec.448" provision.type="other" spent.amends="0"><no>448</no><heading guid="_d76c4daa-a347-47a6-b8cc-68f3a75056ef" id="sec.448-he">Criteria for decisions</heading><block><txt break.before="1">The matters that must be considered in deciding whether to grant a petroleum facility licence or deciding its provisions include each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b31de8af-ba80-4d40-81f6-17650fb63349" id="sec.448-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the applicant’s—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0ab3c0f6-6501-47b6-b950-311d598b943c" id="sec.448-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">financial and technical resources; and</txt></block></li><li guid="_3e3cdb92-f6f4-4b6a-9083-e38a25d8df88" id="sec.448-para1.a-para2.ii-oc.2" provision.type="other"><no>(ii)</no><block><txt break.before="0">ability to competently and safely manage the construction and operation of the proposed petroleum facility;</txt></block></li></list></block></li><li guid="_0b39ea9f-6676-4e6f-855f-09d133d974b6" id="sec.448-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for a proposed petroleum facility, the appropriateness of its—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ec4a922b-c07a-4467-83cd-8a2ed59a509d" id="sec.448-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">location on the proposed petroleum facility land; and</txt></block></li><li guid="_ae4cf7dc-283f-4746-a707-0ed88e5c056c" id="sec.448-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">configuration, design and construction methods;</txt></block></li></list></block></li><li guid="_44557659-41da-4753-b5ef-26b4850112fd" id="sec.448-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the area of the licence is, or is included in, the area of another petroleum authority or a mining interest—any possible impacts of authorised activities under the licence on authorised activities under the other petroleum authority or on mining under the mining interest;</txt></block></li><li guid="_3e1f5b27-c456-45b0-8eb2-1692b17adf2c" id="sec.448-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the purpose of the facility;</txt></block></li><li guid="_d6c515e4-ac0d-4a81-a3d3-7afe9eb032a3" id="sec.448-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">whether the proposed licence is in the public interest.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_2e2c714d-3062-4107-a762-74fb67cdcbe3" id="sec.448A" provision.type="other" spent.amends="0"><no>448A</no><heading guid="_d3962559-6a2a-43fb-a808-ec62f1a6f481" id="sec.448A-he">Provision for facility already the subject of a pipeline licence</heading><subclause affected.by.uncommenced="0" guid="_cf6cbd76-a851-414b-a208-0c2ccf8f505a" id="sec.448A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ff134345-7100-458d-91b4-854e27d5e33f" id="sec.448A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the application is granted; and</txt></block></li><li guid="_70266ed9-075f-47af-89b8-72a7d08614c1" id="sec.448A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the application was for a facility for the distillation, processing, refining, storage or transport of petroleum authorised under a pipeline licence held by the applicant.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_661c7695-ddda-4992-be07-a45a039669ec" id="sec.448A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite <intref check="valid" refid="sec.16" target.guid="_78b3e1f4-de3e-4047-b212-fc9d0c03967e">section 16</intref><intref check="valid" refid="sec.16-ssec.2" target.guid="_6adc79ad-f551-4858-ae12-296593396bfe">(2)</intref>, the facility ceases to be a part of any pipeline the subject of the pipeline licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_41f9c120-097b-433b-827e-de15fbbaa47d" id="sec.448A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The operation of the facility ceases to be an authorised activity for the pipeline licence.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8d982e8c-b34e-49d7-8a7c-f82c049e426b" id="sec.449" provision.type="other" spent.amends="0"><no>449</no><heading guid="_d7426d7b-0606-45ec-880f-85e20a227684" id="sec.449-he">Information notice about refusal</heading><block><txt break.before="1">On refusal of the application, the applicant must be given an information notice about the decision to refuse.</txt></block></clause></subdivision></division><division affected.by.uncommenced="0" guid="_031245f7-938a-42ea-86e0-dd91f21b1fc0" id="ch.4-pt.3-div.3"><no>Division 3</no><heading guid="_8cd0ed96-385e-4868-a102-c94d4523db05" id="ch.4-pt.3-div.3-he">Key mandatory conditions for petroleum facility licences</heading><clause affected.by.uncommenced="0" guid="_d827b9f2-7ba7-482c-95e7-b76bd031b356" id="sec.450" provision.type="other" spent.amends="0"><no>450</no><heading guid="_d5102990-6f34-4483-8a1f-bbdf7868de70" id="sec.450-he">Operation of <intref check="valid" refid="ch.4-pt.3-div.3" target.guid="_031245f7-938a-42ea-86e0-dd91f21b1fc0">div 3</intref></heading><block><txt break.before="1">This division provides for particular mandatory conditions for petroleum facility licences.</txt><note guid="_92089e9f-56c2-4108-ab61-633443f830e2" id="sec.450-note" type="example"><heading guid="_66b18619-6186-40b4-9757-5eaf13ccdd07" id="sec.450-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_5de3ddbe-3e1b-4ca5-89cb-b30f3f69ee27" id="sec.450-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0"><intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">Chapter 5</intref> also provides for mandatory conditions for petroleum facility licences.</txt></block></li><li guid="_75fbe2d5-cde4-4401-857c-e56f6dc14103" id="sec.450-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">For what is a mandatory condition, see <intref check="valid" refid="sec.20" target.guid="_746e989f-44f2-4d9b-9550-13495b74b131">section 20</intref><intref check="valid" refid="sec.20-ssec.2" target.guid="_6716699a-7cd3-4f35-945e-49a35a3ccdd3">(2)</intref>.</txt></block></li></list></block></note></block></clause><clause affected.by.uncommenced="0" guid="_52f70733-0a09-44c5-a899-1306138dbc6c" id="sec.452" provision.type="other" spent.amends="0"><no>452</no><heading guid="_7918aed2-7700-4677-9341-fc7e7a39269d" id="sec.452-he">Obligation to construct facility</heading><block><txt break.before="1">A petroleum facility licence holder must complete construction of the petroleum facility the subject of the licence on or before any completion day for the construction stated in the licence.</txt></block></clause><clause affected.by.uncommenced="0" guid="_f7420106-eee6-4cf1-a4bc-1674818e1fa9" id="sec.453" provision.type="other" spent.amends="0"><no>453</no><heading guid="_37b4cc9e-20b6-4f61-b483-7e14e91c4d46" id="sec.453-he">Obligation to operate facility</heading><block><txt break.before="1">The holder of a petroleum facility licence must, after the facility has been constructed, operate it in a way that ensures the continuing of the facility for the purpose for which it is licensed.</txt></block></clause><clause affected.by.uncommenced="0" guid="_e9f18a9d-41d2-40d1-a10b-d9a4ffc9621c" id="sec.454" provision.type="other" spent.amends="0"><no>454</no><heading guid="_d5ca2a8f-9672-4dbb-ac92-fbf394d177ca" id="sec.454-he">Annual licence fee</heading><subclause affected.by.uncommenced="0" guid="_210cda82-177e-43de-b54c-f22ac1e4a0da" id="sec.454-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A petroleum facility licence holder must pay the State an annual licence fee as prescribed under a regulation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_277df561-7c1a-4931-a594-4acbb3eb2231" id="sec.454-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The fee must be paid in the way, and on or before the day, prescribed under a regulation.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_de4ec692-6e1d-4666-89be-d1c7e628610a" id="sec.455" provision.type="other" spent.amends="0"><no>455</no><heading guid="_c08e896d-d579-4063-9133-c334432ae85c" id="sec.455-he">Civil penalty for nonpayment of annual licence fee</heading><subclause affected.by.uncommenced="0" guid="_3f503819-8fc0-4dca-bf2b-630af57c4113" id="sec.455-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a petroleum facility licence holder does not pay an annual licence fee as required under <intref check="valid" refid="sec.454" target.guid="_e9f18a9d-41d2-40d1-a10b-d9a4ffc9621c">section 454</intref>, the holder must also pay the State a civil penalty.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7079da9f-7666-45b4-a8ab-7c06563c64a5" id="sec.455-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The amount of the penalty is 15% of the fee.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_801279da-6048-4edd-b9f9-13ea5f7d2f7d" id="sec.455-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The penalty—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9a71900b-e46e-49a0-9fb4-9a3c4ab79659" id="sec.455-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must be paid on the day after the last day for payment of the fee; and</txt></block></li><li guid="_b5287472-98fd-435d-9d78-91e3391a48a3" id="sec.455-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is still payable even if the holder later pays the fee.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_5aabd75a-29b0-4430-81df-2f84319d537d" id="sec.455A" provision.type="other" spent.amends="0"><no>455A </no><heading guid="_7442c4d8-999a-4c37-8d2d-ef0643e4dbeb" id="sec.455A-he">Power to impose or amend condition if changed holder of petroleum facility licence</heading><subclause affected.by.uncommenced="0" guid="_72188c6e-f2c3-40cb-ae74-ff6ca7950b19" id="sec.455A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if 1 of the following changes happens—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4f7002d8-3d1e-41ec-9e76-9da594f14963" id="sec.455A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an entity starts or stops controlling the holder of a petroleum facility licence under the Corporations Act, section 50AA; </txt></block></li><li guid="_c8f756ea-0e53-4616-b238-d40f274e78b7" id="sec.455A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder of a petroleum facility licence starts or stops being a subsidiary of a corporation under the Corporations Act, section 46.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_153c2a22-f908-468e-8f5b-9eec1d6727a3" id="sec.455A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister may consider whether, after the change, the holder of the petroleum facility licence has the financial and technical resources to comply with the conditions of the petroleum facility licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_cd927e0c-8672-4fb1-8471-da69e65481ae" id="sec.455A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the Minister considers the holder of the petroleum facility licence may not have the financial and technical resources to comply with conditions of the petroleum facility licence, the Minister may impose another condition on, or amend a condition of, the petroleum facility licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0032e852-673e-48e3-8dff-f08e94e47d19" id="sec.455A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the Minister believes a change mentioned in subsection (1) may have happened, the Minister may require the holder of the petroleum facility licence to give the Minister information or a document about whether or not the change has happened.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6fad5236-bc09-4af4-b2be-fe852e10765b" id="sec.455A-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Before deciding to impose another condition on, or amend a condition of, the petroleum facility licence under subsection (3), the Minister may require the holder of the petroleum facility licence to give the Minister information or a document the Minister requires to make the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3bac68bf-bd08-4fb2-970b-9a40b6900563" id="sec.455A-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">A requirement under subsection (4) or (5) must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7b4a347f-da51-4047-b9d1-520459ac9d4f" id="sec.455A-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be made by notice given to the holder; and</txt></block></li><li guid="_9c4ccf5d-7a2d-42b4-8151-18175c0ec74b" id="sec.455A-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state a period of at least 10 business days within which the holder must comply with the requirement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0003c8e9-5a3d-46d5-bc5a-61d98ecba69d" id="sec.455A-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">Before deciding to impose another condition on, or amend a condition of, the petroleum facility licence under subsection (3), the Minister must give the holder of the licence a notice stating—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bda84be8-3f05-4bff-8159-de8623c29077" id="sec.455A-ssec.7-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the proposed decision; and</txt></block></li><li guid="_69d7c8eb-7a88-48b3-8f9c-528cc76b6c1c" id="sec.455A-ssec.7-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the reasons for the proposed decision; and</txt></block></li><li guid="_21291832-ec3e-4e58-9e50-ce824dfd3d5e" id="sec.455A-ssec.7-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that the holder may, within 10 business days after the notice is given, make submissions to the Minister about the proposed decision.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5c4e0e0d-2aef-4fdd-8386-09c7bdffc2da" id="sec.455A-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">The Minister may extend the period mentioned in subsection (6)(b) or (7)(c) by notice given to the holder of the petroleum facility licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_beb1ee87-9abf-40ae-9a67-9b452612ff76" id="sec.455A-ssec.9" provision.type="other"><no>(9)</no><block><txt break.before="0">In deciding whether to impose another condition on, or amend a condition of, the petroleum facility licence under subsection (3), the Minister—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_85b818d7-6345-4f4c-a62e-fb4d5350c7bc" id="sec.455A-ssec.9-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must consider information or a document, if any, given under subsection (6)(b) or (7)(c); and</txt></block></li><li guid="_04871859-5e99-41bf-ba0f-fc336c497c33" id="sec.455A-ssec.9-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">may consider any other matter the Minister considers relevant.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0df02b83-7a13-429c-a7c0-7d3008b9d34b" id="sec.455A-ssec.10" provision.type="other"><no>(10)</no><block><txt break.before="0">If the Minister decides to impose another condition on, or amend a condition of, the petroleum facility licence under subsection (3), the Minister must, as soon as practicable after making the decision, give the holder a notice stating the decision and the reasons for the decision.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_ddc9a3ac-2cbc-4995-82d3-b60fce89503b" id="ch.4-pt.4"><no>Part 4</no><heading guid="_7804c21a-45c2-4c22-b008-ab503ca4d7da" id="ch.4-pt.4-he">Taking land for pipelines and petroleum facilities</heading><clause affected.by.uncommenced="0" guid="_a2ae2083-a7ba-4d2b-a95d-2db6e65409cb" id="sec.456" provision.type="other" spent.amends="0"><no>456</no><heading guid="_7745274f-acd5-4b00-bef8-7611d37aaf6c" id="sec.456-he">State’s power to take land</heading><subclause affected.by.uncommenced="0" guid="_d34286b1-4b7f-42c6-8bd7-3e3c530afade" id="sec.456-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies subject to <intref check="valid" refid="sec.457" target.guid="_c0a84b21-801f-4ba1-bf99-5bbef2e89730">sections 457</intref> and <intref check="valid" refid="sec.458" target.guid="_125a6292-9e16-44c0-815c-1762cb26e09e">458</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_490072b9-96fa-4367-8b3f-e5948a9d2711" id="sec.456-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The State may take land, or an interest in land for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_199678a4-8d41-453d-8b80-b00142bb0230" id="sec.456-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the carrying out of authorised activities for a licence or proposed licence; or</txt></block></li><li guid="_90cb01aa-8f53-4e9d-8da4-c3ad1dd5419c" id="sec.456-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">petroleum processing, storage or transport, including, for example, to construct and operate a pipeline.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7e14fc1c-e010-43f7-a8e6-871d45b2b17c" id="sec.456-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The power to take land may be exercised—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4a27290d-e23f-4ff3-9dca-d3ed88323622" id="sec.456-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for the State by the Minister; and</txt></block></li><li guid="_7e5bb39d-fc59-46d3-9e3d-a818323f00a0" id="sec.456-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether or not the State proposes to transfer the land, or an interest in the land, to someone else.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c1b8d1f4-819f-4727-bfb2-16fcd16b68d1" id="sec.456-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">To remove any doubt, it is declared that if the land is held from the State under the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-081" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act"><name emphasis="yes">Land Act 1994</name></legref> or another Act, the power is as well as, and is not limited by, any power under the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-081" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act"><name emphasis="yes">Land Act 1994</name></legref> or other Act to forfeit or take the land or the interest under which it is held.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e67ea99e-94d1-4090-8ef1-448c977b5efc" id="sec.456-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_ae195d72-5950-4630-900e-2b092c7c846a" id="sec.456-ssec.5-def.licence_"><txt break.before="1"><defterm guid="_f988deae-3343-489c-aea6-a3c03c6f6c3d" id="sec.456-ssec.5-def.licence" type="definition">licence</defterm> does not include a survey licence.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c0a84b21-801f-4ba1-bf99-5bbef2e89730" id="sec.457" provision.type="other" spent.amends="0"><no>457</no><heading guid="_fde21d99-a559-4238-bb87-163c99a917b3" id="sec.457-he">Restrictions on power to take land</heading><subclause affected.by.uncommenced="0" guid="_96cfac05-4392-4efa-92ee-8c14320b2031" id="sec.457-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The State may take land under <intref check="valid" refid="sec.456" target.guid="_a2ae2083-a7ba-4d2b-a95d-2db6e65409cb">section 456</intref> only if the Minister is satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_71b511e0-0a82-497d-802f-88dd61efd17d" id="sec.457-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the area of the land is the minimum area needed to adequately carry out the activities for which it is taken; and</txt></block></li><li guid="_2615a0e3-326e-4ce7-ac4d-f6c57ecb85f4" id="sec.457-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">other land is not more appropriate for carrying out the activities; and</txt></block></li><li guid="_4251d63f-a1cf-4043-a266-2801d87389ef" id="sec.457-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the taking of the land is in the public interest.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_aaa6dd12-b393-44be-bc48-6cac97dbff5b" id="sec.457-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Also, the State may take land for authorised activities for a petroleum facility licence, or proposed petroleum facility licence, for a facility to be used in connection with a pipeline or proposed pipeline only if the Minister is satisfied the licence holder, or proposed licence holder, has decided the site of the pipeline.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_125a6292-9e16-44c0-815c-1762cb26e09e" id="sec.458" provision.type="other" spent.amends="0"><no>458</no><heading guid="_e1cd7d22-339d-438a-b097-16976c6405d5" id="sec.458-he">Process for taking land</heading><subclause affected.by.uncommenced="0" guid="_4bd110dd-1378-428c-80e1-2f7e1a37fd51" id="sec.458-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="yes">Acquisition of Land Act 1967</name></legref> (the <defterm guid="_dd021683-c375-4b72-8de9-d0bab6bff1d2" id="sec.458-def.ALA" type="definition">ALA</defterm>) applies for taking land under <intref check="valid" refid="sec.456" target.guid="_a2ae2083-a7ba-4d2b-a95d-2db6e65409cb">section 456</intref> and paying compensation for land taken as if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7147fafe-8f0e-45d8-9096-c5baeb79d956" id="sec.458-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the taking were a taking under that Act by a constructing authority; and</txt></block></li><li guid="_ae21d376-1a45-46b2-98fe-d36126e3c7ca" id="sec.458-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the reference in the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="no">ALA</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.5" target.doc.id="act-1967-048" target.guid="_86a487f0-7309-4ed3-9bc0-946111a99423" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act">section 5</legref><legref check="invalid" jurisd="QLD" type="act">(1)</legref><legref check="invalid" jurisd="QLD" type="act">(c)</legref> to the taking of land for a purpose stated in the schedule to that Act were a reference to the taking of land for a purpose mentioned in <intref check="valid" refid="sec.456" target.guid="_a2ae2083-a7ba-4d2b-a95d-2db6e65409cb">section 456</intref><intref check="valid" refid="sec.456-ssec.2" target.guid="_490072b9-96fa-4367-8b3f-e5948a9d2711">(2)</intref>; and</txt></block></li><li guid="_03a25a7b-979a-402c-9d38-e1351397134f" id="sec.458-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the constructing authority were the State; and</txt></block></li><li guid="_d3dbf8cf-c189-44f8-b19d-18f793f20a7d" id="sec.458-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the reference in the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="no">ALA</name></legref> to the relevant Minister is a reference to the Minister administering this Act.</txt></block></li></list><note guid="_5589ae8a-77db-4d64-9e6e-7ae598e52883" id="sec.458-ssec.1-note" type="example"><heading guid="_048f6865-c5a8-457d-bf2f-11ce9f1a7f68" id="sec.458-ssec.1-note-he">Note—</heading><block><txt break.before="1">However, for land where native title exists, see <intref check="valid" refid="sec.8" target.guid="_f6de11d3-fea5-4004-8db4-75de643dcfd9">sections 8</intref> and <intref check="valid" refid="sec.855" target.guid="_9f4efd6a-8ee3-4578-a80e-0a6a937eaf98">855</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_450a3efb-6b07-42be-aad3-65aa88ccf867" id="sec.458-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Taking land under <intref check="valid" refid="sec.456" target.guid="_a2ae2083-a7ba-4d2b-a95d-2db6e65409cb">section 456</intref> does not become a taking of land under the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="no">ALA</name></legref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0a605342-993f-4dc4-ada7-bc7bacb66a23" id="sec.458-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In assessing the compensation, allowance can not be made for the value of petroleum known or supposed to be on or under, or produced from, the land.</txt><note guid="_fffd7c34-4209-482f-8c3e-feeb05b9f1ed" id="sec.458-ssec.3-note" type="example"><heading guid="_7aa71dc2-72e7-476f-89d5-76ead0db0614" id="sec.458-ssec.3-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.462" target.guid="_5562db44-198d-47ca-bf4a-72201eba7695">section 462</intref> (Disposal of land taken by State).</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e7e46f5c-9561-4256-8150-dfa14e18a499" id="sec.459" provision.type="other" spent.amends="0"><no>459</no><heading guid="_cf71f900-be34-4aea-a10f-7cff89b862d2" id="sec.459-he">Recovery of costs and compensation from holder or proposed holder</heading><subclause affected.by.uncommenced="0" guid="_370f05ee-02d9-4a25-9457-91cd20908107" id="sec.459-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the State incurs, or becomes liable to pay—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a0020d3b-ff27-4d85-a7d1-a0edca462917" id="sec.459-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">costs relating to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_822b9e50-64be-4b2f-bb95-4c9dc5f4d729" id="sec.459-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the taking under <intref check="valid" refid="sec.456" target.guid="_a2ae2083-a7ba-4d2b-a95d-2db6e65409cb">section 456</intref><intref check="valid" refid="sec.456-ssec.2" target.guid="_490072b9-96fa-4367-8b3f-e5948a9d2711">(2)</intref> of land for the carrying out of authorised activities for a licence or proposed licence; or</txt></block></li><li guid="_85042108-7442-4be2-996f-f881476f08b1" id="sec.459-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the transfer of the land to the relevant person; or</txt></block></li><li guid="_894c6727-0599-4ec2-8cdf-8d70f78f7860" id="sec.459-ssec.1-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the negotiation of the transfer, or any contract relating to the transfer; or</txt></block></li></list></block></li><li guid="_4b4102a7-01cb-4ca7-b99a-de32b14b72da" id="sec.459-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">assessed compensation for the taking; or</txt></block></li><li guid="_d88e7abc-8fe3-4186-b5d6-d7de60df171c" id="sec.459-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">costs relating to the compensation or its assessment; or</txt></block></li><li guid="_c9826f7f-e262-4126-9ecd-1f11671c4c8d" id="sec.459-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">interest on the compensation or costs.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_eb18fbd5-b8a6-4a7f-a3df-e605775de034" id="sec.459-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The State may recover from the relevant person as a debt—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b5782ff3-274d-4dc0-8644-2decc2b46a23" id="sec.459-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the reasonable amount of the costs; and</txt></block></li><li guid="_4fb4b3d3-5098-4ed1-9d98-33a4d53c65dd" id="sec.459-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the amount of the assessed compensation and the interest.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_bfa1d5ca-3f59-4798-aae2-ddb50ff93e85" id="sec.459-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_a3e815c2-c73f-4028-a0f2-702163f2c70a" id="sec.459-ssec.3-def.relevantperson_"><txt break.before="1"><defterm guid="_152bd20c-7ecf-40dc-8647-178912c43c61" id="sec.459-ssec.3-def.relevantperson" type="definition">relevant person</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1c8288a9-97d9-437a-b6a6-f316be692301" id="sec.459-ssec.3-def.relevantperson-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">relevant licence holder; or</txt></block></li><li guid="_fd9f62e7-b38a-4f1b-9474-26940306165b" id="sec.459-ssec.3-def.relevantperson-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the taking was for authorised activities for a proposed licence—the person who proposed to obtain the licence.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7dfdd34b-597e-4521-8878-f703077710da" id="sec.460" provision.type="other" spent.amends="0"><no>460</no><heading guid="_17e20372-aa70-4319-96dc-73c227fa98c3" id="sec.460-he">Power to enter land proposed to be taken</heading><subclause affected.by.uncommenced="0" guid="_77b2d3a2-1050-4c65-9ca9-e45f755f5015" id="sec.460-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may authorise a person (the <defterm guid="_73e8f496-5c76-4c8f-a19d-dbcdbced0e50" id="sec.460-def.authorisedperson" type="definition">authorised person</defterm>) to enter land proposed to be taken under <intref check="valid" refid="sec.456" target.guid="_a2ae2083-a7ba-4d2b-a95d-2db6e65409cb">section 456</intref> to report to the Minister about the suitability of the land for the purpose for which it is proposed to be taken.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_871d008f-494b-4ace-9583-40175ac7f216" id="sec.460-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.460-ssec.1" target.guid="_77b2d3a2-1050-4c65-9ca9-e45f755f5015">Subsection (1)</intref> applies even if the process for taking the land has not started.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_63e1929c-7361-4798-8f8e-980ccf13890e" id="sec.460-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The authorisation—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c103c732-768e-4b1f-97ac-5cbef86cf9be" id="sec.460-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must be written; and</txt></block></li><li guid="_973b3447-4986-4420-9f62-54804f37fdb8" id="sec.460-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">may be given on conditions the Minister considers appropriate.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_497449b3-6122-4157-bb85-fafceeab2c12" id="sec.460-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.461" target.guid="_df6e6c3d-6c10-4ecc-925c-08cb4eac6f7c">section 461</intref>, the authorised person may enter the land and carry out activities necessary or convenient for the report.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f8ff3798-1b70-4ae2-a3d4-b631777a45fc" id="sec.460-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">However, the power under this section does not include the power to enter a structure, or a part of a structure, used for residential purposes without the consent of the occupier of the structure or part of the structure.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_df6e6c3d-6c10-4ecc-925c-08cb4eac6f7c" id="sec.461" provision.type="other" spent.amends="0"><no>461</no><heading guid="_72e1d07a-a559-4a48-851f-24fba0856f8b" id="sec.461-he">Requirements for entry to land proposed to be taken</heading><subclause affected.by.uncommenced="0" guid="_00c98102-53c0-4fae-882d-f59233883f94" id="sec.461-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An authorised person under <intref check="valid" refid="sec.460" target.guid="_7dfdd34b-597e-4521-8878-f703077710da">section 460</intref> may enter land proposed to be taken only if the following person is given notice of the proposed entry at least 10 business days before the proposed entry—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d3008212-032c-4fe6-9013-0f9253076e9a" id="sec.461-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the land has an occupier—any occupier of the land;</txt></block></li><li guid="_059e7cc6-699b-49e4-a299-ce47a5c30403" id="sec.461-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the land does not have an occupier—its owner.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d7ac7f63-1d89-4594-8706-031828e2e52e" id="sec.461-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f75f6987-7c1f-425c-a267-fe3d4d5ab828" id="sec.461-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">identify the authorised person; and</txt></block></li><li guid="_c56906fa-d67a-41b9-9648-de7dcf7c3b93" id="sec.461-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">describe the land; and</txt></block></li><li guid="_2222d35f-3992-4e15-879b-4ac0125207ab" id="sec.461-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_369f142f-96fb-4ad3-a2ba-c1ae8fc719bc" id="sec.461-ssec.2-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">that the authorised person has, under this section, been authorised to enter the land; and</txt></block></li><li guid="_436faa49-24e3-4689-98c7-9777f56a25ec" id="sec.461-ssec.2-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the purpose of the entry; and</txt></block></li><li guid="_3300e90d-e9c4-4383-9564-937dfcd2adca" id="sec.461-ssec.2-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the period of the entry.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_118d456e-4ed4-462a-86eb-4e178fb34751" id="sec.461-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive may approve the giving of the notice by publishing it in a stated way.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_912aa62c-2a5d-4d54-b2f3-f617863923f1" id="sec.461-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive may give the approval only if satisfied the publication is reasonably likely to adequately inform the person to whom the notice is required to be given of the proposed entry.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9e5e747f-13d4-4038-bed4-c2aba44bac80" id="sec.461-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the authorised person intends to enter the land and any occupier of the land is present at the land, the person also must show, or make a reasonable attempt to show, the occupier the person’s authorisation under this section.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_5562db44-198d-47ca-bf4a-72201eba7695" id="sec.462" provision.type="other" spent.amends="0"><no>462</no><heading guid="_e921aa88-58e1-406a-9948-4cd48e388a09" id="sec.462-he">Disposal of land taken by State</heading><subclause affected.by.uncommenced="0" guid="_ad855611-636f-4f34-9d2d-3f9594a92157" id="sec.462-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The State may transfer land taken under <intref check="valid" refid="sec.456" target.guid="_a2ae2083-a7ba-4d2b-a95d-2db6e65409cb">section 456</intref> to anyone else, including, for example, the holder or proposed holder of a licence for the land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8ed1314d-49d1-4299-9320-1f2eefba334e" id="sec.462-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="yes">Acquisition of Land Act 1967</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.41" target.doc.id="act-1967-048" target.guid="_dd9e9287-b234-46a7-be60-f363271ff5fa" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act">section 41</legref>, applies to land taken under <intref check="valid" refid="sec.456" target.guid="_a2ae2083-a7ba-4d2b-a95d-2db6e65409cb">section 456</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_41cc1e4e-7dc4-4582-8826-72db2e39589f" id="sec.462-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.462-ssec.2" target.guid="_8ed1314d-49d1-4299-9320-1f2eefba334e">subsection (2)</intref> only applies if the State has not offered, or proposed to offer, the land for sale to any holder, or proposed holder, of a licence the area of which includes the land.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_eab0c8dc-b6df-485f-877e-6a37095b8990" id="ch.4-pt.5"><no>Part 5</no><heading guid="_80424a82-76c1-48eb-aee4-ad67496e1507" id="ch.4-pt.5-he">Permission to enter land to exercise rights under a pipeline or petroleum facility licence</heading><division affected.by.uncommenced="0" guid="_f5326aaf-6202-43c3-88d8-fa905faa195d" id="ch.4-pt.5-div.1"><no>Division 1</no><heading guid="_cfda77d5-b99b-4a06-98d9-46d29c6c9023" id="ch.4-pt.5-div.1-he">Applying for and obtaining permission</heading><clause affected.by.uncommenced="0" guid="_6a2f932f-bd5e-4ea8-88d4-afe2d0d765e3" id="sec.463" provision.type="other" spent.amends="0"><no>463</no><heading guid="_c7bcc26e-f9d4-4489-aa38-b52b3ba024eb" id="sec.463-he">Applying for permission</heading><subclause affected.by.uncommenced="0" guid="_c9f8ced7-4556-4e70-9e06-b927dfdaf159" id="sec.463-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person who holds, or who has applied for, a pipeline licence may apply for permission (a <defterm guid="_f5637542-97bf-4d3c-8cae-04ebde56981d" id="sec.463-def.part5permission" type="definition">part 5 permission</defterm>) to enter the area, or proposed area, of the licence to construct or operate a pipeline the subject of the licence or proposed licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_785a431c-02ae-446c-8d4f-2b45067c4a71" id="sec.463-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A person who holds, or who has applied for, a petroleum facility licence may apply for permission (also a <defterm guid="_4d5adf5d-79e4-4deb-aa47-075a2772ca5f" id="sec.463-def.part5permission-oc.2" type="definition">part 5 permission</defterm>) to enter the area, or proposed area, of the licence to construct or operate the petroleum facility the subject of the licence or proposed licence.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_819bc1ea-c746-48a2-b0a6-f98c583c2c63" id="sec.464" provision.type="other" spent.amends="0"><no>464</no><heading guid="_528cd463-0153-419a-a48f-bc03730aa593" id="sec.464-he">Requirements for making application</heading><block><txt break.before="1">An application for a <intref check="valid" refid="ch.4-pt.5" target.guid="_eab0c8dc-b6df-485f-877e-6a37095b8990">part 5</intref> permission must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5a999102-ae2f-4f2c-81a1-d305ce3c3684" id="sec.464-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li guid="_9ad01903-2e30-41c5-afe5-ef37cff446b4" id="sec.464-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">be accompanied by the fee prescribed under a regulation; and</txt></block></li><li guid="_dd157f93-65a7-49c8-bdc3-cc5e86030fb1" id="sec.464-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">state the steps the applicant has taken to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3d127d69-9fbe-45ac-8715-018038d2ab4e" id="sec.464-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">become the owner of the land; or</txt></block></li><li guid="_246bc5f2-dc29-430b-84b1-844355a511e4" id="sec.464-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">be granted an appropriate easement to construct or operate the pipeline or petroleum facility; or</txt></block></li><li guid="_191a9b52-0bde-421f-a1e6-25d83fa24af3" id="sec.464-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">obtain the permission of the owner of the land to enter the land to construct or operate the pipeline or petroleum facility.</txt></block></li></list><note guid="_5ca9d63e-61fe-432e-966e-eedce9077fb1" id="sec.464-para1.c-note" type="example"><heading guid="_3c41077d-0966-44d5-81a2-422211d433d9" id="sec.464-para1.c-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="sec.401" target.guid="_0741738d-27f0-4420-91c6-dfbec69fdbe6">sections 401</intref> (Construction and operation of pipeline) and <intref check="valid" refid="sec.441" target.guid="_8ebc84bd-7950-43e0-90ff-98bea86e1b1d">441</intref> (Construction and operation of petroleum facility).</txt></block></note></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_7d2a1719-f499-4fa2-9703-03414833a7f2" id="sec.465" provision.type="other" spent.amends="0"><no>465</no><heading guid="_4cda0672-acef-439a-9378-ff7cbc98a54d" id="sec.465-he">Notice to owners about application</heading><subclause affected.by.uncommenced="0" guid="_8c98faf2-df9a-41a9-9da5-50f616c35b5d" id="sec.465-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The applicant must give each owner of the land notice (a <defterm guid="_b33ec445-ea5b-4034-94b5-b212819ee2bb" id="sec.465-def.consultationnotice" type="definition">consultation notice</defterm>) of the application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7070b6af-8a79-4b2e-81af-85ef88a94e32" id="sec.465-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The consultation notice must describe the land and state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_325b5633-b01a-465c-b613-6122377cae42" id="sec.465-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the purpose of the proposed <intref check="valid" refid="ch.4-pt.5" target.guid="_eab0c8dc-b6df-485f-877e-6a37095b8990">part 5</intref> permission; and</txt></block></li><li guid="_e88c8e11-edf4-46f6-acdd-b35fd3633658" id="sec.465-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any conditions the applicant proposes for the <intref check="valid" refid="ch.4-pt.5" target.guid="_eab0c8dc-b6df-485f-877e-6a37095b8990">part 5</intref> permission; and</txt></block></li><li guid="_4dd6e1eb-7590-4313-89f7-dfc7116f66fd" id="sec.465-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a period (the <defterm guid="_64c3ce3f-4bc0-4257-a3e1-c2d4a66d70a7" id="sec.465-ssec.2-def.consultationperiod" type="definition">consultation period</defterm>) during which—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_260c1199-4a4f-4532-b6ee-dbef6b93699a" id="sec.465-ssec.2-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the applicant will consult with each owner about the proposed permission and the conditions; and</txt></block></li><li guid="_599b7d30-14eb-403e-bb29-dab74eea040f" id="sec.465-ssec.2-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">an owner may lodge submissions about the proposed <intref check="valid" refid="ch.4-pt.5" target.guid="_eab0c8dc-b6df-485f-877e-6a37095b8990">part 5</intref> permission and the conditions.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6a919d33-10d0-42b4-b252-263b414274d8" id="sec.465-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The consultation period must end at least 20 business days after each owner has been given the consultation notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_666499e1-de63-46e1-a5dd-8857834b7caa" id="sec.465-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The period may be extended by agreement between the applicant for the <intref check="valid" refid="ch.4-pt.5" target.guid="_eab0c8dc-b6df-485f-877e-6a37095b8990">part 5</intref> permission and the owner.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_630481ae-7a3b-4d2f-96ac-e06fcedf6cb5" id="sec.466" provision.type="other" spent.amends="0"><no>466</no><heading guid="_13f81c41-6c24-40d1-9629-23afb1ddc8ad" id="sec.466-he">Change in ownership during consultation period</heading><subclause affected.by.uncommenced="0" guid="_509ab233-4d06-4849-840f-181499927d4d" id="sec.466-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1d9ad61e-a1b6-40cb-b105-4438af581b98" id="sec.466-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an owner of the land (the <defterm guid="_d1e0d494-61b3-4d8e-9e4a-06ba3f53b5eb" id="sec.466-ssec.1-def.formerowner" type="definition">former owner</defterm>) has been given a consultation notice; and</txt></block></li><li guid="_1a7a46ac-6171-4766-92b9-20f1ea22653c" id="sec.466-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">after the notice was given, the ownership of the land changes.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_75fbc0ad-b2e7-4b02-83fe-fd13f1e24c2d" id="sec.466-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The applicant is taken to have given the notice to the new owner of the land when the former owner was given the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4ffa1acc-4061-4a45-b0b2-d575291fb02f" id="sec.466-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the applicant becomes aware of the change, the applicant must give the new owner a copy of the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_892acbb3-f04b-42e2-bf84-c8fef4f5a34b" id="sec.466-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A failure to comply with <intref check="valid" refid="sec.466-ssec.3" target.guid="_4ffa1acc-4061-4a45-b0b2-d575291fb02f">subsection (3)</intref> does not prevent the application from being decided.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a18f10eb-0bdf-417d-bc56-e1860fa7cc98" id="sec.467" provision.type="other" spent.amends="0"><no>467</no><heading guid="_bd2b7db3-e7d2-4971-b84f-6ade3ba0bc90" id="sec.467-he">Deciding application</heading><subclause affected.by.uncommenced="0" guid="_0f11c9ca-7665-4130-868d-d7734983e20f" id="sec.467-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may, after the consultation period has ended, grant or refuse the <intref check="valid" refid="ch.4-pt.5" target.guid="_eab0c8dc-b6df-485f-877e-6a37095b8990">part 5</intref> permission.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_69e23bbd-94e0-4dd5-979d-7f79983bc1ea" id="sec.467-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister may impose conditions on the <intref check="valid" refid="ch.4-pt.5" target.guid="_eab0c8dc-b6df-485f-877e-6a37095b8990">part 5</intref> permission.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_173e530b-7516-4b45-a3d1-f0ec9eb0a183" id="sec.468" provision.type="other" spent.amends="0"><no>468</no><heading guid="_7a4a0a1c-9078-4ef0-ba9a-14be2d8529d5" id="sec.468-he">Criteria for decision</heading><subclause affected.by.uncommenced="0" guid="_5e7b0f17-5381-4767-991a-bee2c080758f" id="sec.468-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may grant the <intref check="valid" refid="ch.4-pt.5" target.guid="_eab0c8dc-b6df-485f-877e-6a37095b8990">part 5</intref> permission only if satisfied of each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_17e26891-72a3-4727-bbbf-7804a4059fd2" id="sec.468-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the applicant has given each owner of the land a consultation notice and the applicant has shown that each owner of the land has received the notice;</txt></block></li><li guid="_bc6290f9-a92f-4388-8bf7-b7f2c61f582f" id="sec.468-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">either—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2495962b-e7c2-4184-ae7c-21ec357a9599" id="sec.468-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the consultation period has ended and the Minister is reasonably satisfied the applicant has made reasonable attempts to consult with each owner of the land; or</txt></block></li><li guid="_9b010b35-b118-42e3-86bd-d64eefdaf816" id="sec.468-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">before the end of the consultation period each owner of the land has—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_855c4581-6127-4186-a847-e79353dedcfa" id="sec.468-ssec.1-para1.b-para2.ii-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">agreed to the grant of the <intref check="valid" refid="ch.4-pt.5" target.guid="_eab0c8dc-b6df-485f-877e-6a37095b8990">part 5</intref> permission; or</txt></block></li><li guid="_0e7cdb09-a3f0-4887-a31a-3fe8c3712be8" id="sec.468-ssec.1-para1.b-para2.ii-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">given the applicant permission to enter the land;</txt></block></li></list></block></li></list></block></li><li guid="_a56d2549-d327-4641-bc4b-447429c37f47" id="sec.468-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the applicant has decided the site of the pipeline or facility;</txt></block></li><li guid="_1b0182c6-5ca7-4cc1-80e1-cd31e12557c7" id="sec.468-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">it is reasonable to site the pipeline or petroleum facility on the land;</txt></block></li><li guid="_700643f7-13f2-4263-90ad-bc160896986c" id="sec.468-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the land the subject of the <intref check="valid" refid="ch.4-pt.5" target.guid="_eab0c8dc-b6df-485f-877e-6a37095b8990">part 5</intref> permission is the minimum area needed for the permission;</txt></block></li><li guid="_43378195-14e1-42c0-a709-024d863bcfee" id="sec.468-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">the granting of the <intref check="valid" refid="ch.4-pt.5" target.guid="_eab0c8dc-b6df-485f-877e-6a37095b8990">part 5</intref> permission is in the public interest.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e63480ce-307f-42e7-b311-c2e2347b4d13" id="sec.468-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In deciding the application any submissions lodged by an owner of the land during the consultation period must be considered.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f09d3ed9-1cc6-4b55-8630-2ff1e3721c62" id="sec.469" provision.type="other" spent.amends="0"><no>469</no><heading guid="_2b1e0754-49b5-40fa-9600-8a5c2ff5230b" id="sec.469-he">Statement of proposed resumption may be included</heading><block><txt break.before="1">The <intref check="valid" refid="ch.4-pt.5" target.guid="_eab0c8dc-b6df-485f-877e-6a37095b8990">part 5</intref> permission may include a statement that the State intends to resume the land the subject of the permission if the land is not, other than because of the permission, pipeline land or petroleum facility land for the licence, or proposed licence within 9 months after the permission takes effect.</txt><note guid="_72e9d050-ecd1-4582-b126-dbb017dec8a2" id="sec.469-note" type="example"><heading guid="_ee939a6c-c809-4443-b879-3f7376e1b7a6" id="sec.469-note-he">Note—</heading><block><txt break.before="1">For the State’s power to take the land, see <intref check="valid" refid="ch.4-pt.4" target.guid="_ddc9a3ac-2cbc-4995-82d3-b60fce89503b">part 4</intref>.</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_6943ff57-7741-407a-9984-aa423239dd85" id="sec.470" provision.type="other" spent.amends="0"><no>470</no><heading guid="_102a44ee-7815-4438-8ceb-2144b3e374be" id="sec.470-he">Steps after and taking effect of <intref check="valid" refid="ch.4-pt.5" target.guid="_eab0c8dc-b6df-485f-877e-6a37095b8990">part 5</intref> permission</heading><subclause affected.by.uncommenced="0" guid="_1ffe0975-8367-4609-9932-2b94d01ce34e" id="sec.470-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">On granting of the <intref check="valid" refid="ch.4-pt.5" target.guid="_eab0c8dc-b6df-485f-877e-6a37095b8990">part 5</intref> permission, the applicant and the owner of the land the subject of the permission must be given a copy of it.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7c4ca29a-95db-4aaa-943c-f4da228801cc" id="sec.470-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The permission takes effect on the later of the following days—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8ff9e34b-5a26-43cb-b8d3-c5635de9fc13" id="sec.470-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the day it is granted;</txt></block></li><li guid="_f25445b5-7abe-46fd-9191-1cdbe34ed72f" id="sec.470-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the applicant does not hold the relevant pipeline or petroleum facility licence—the day the licence is granted;</txt></block></li><li guid="_1087a2b7-2b3d-4898-b3ec-67ba6dea6ecd" id="sec.470-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">another day fixed by the Minister.</txt></block></li></list><note guid="_ebd05092-eacc-45d2-8b0b-7d361d2ff3af" id="sec.470-ssec.2-note" type="example"><heading guid="_0d57b09a-5a9b-4442-9b73-5a39e3811c33" id="sec.470-ssec.2-note-he">Note—</heading><block><txt break.before="1">For the authorised activities that may be carried out when the <intref check="valid" refid="ch.4-pt.5" target.guid="_eab0c8dc-b6df-485f-877e-6a37095b8990">part 5</intref> permission takes effect (and, if the licence has not been granted, when it is granted), see <intref check="valid" refid="sec.401" target.guid="_0741738d-27f0-4420-91c6-dfbec69fdbe6">sections 401</intref> and <intref check="valid" refid="sec.441" target.guid="_8ebc84bd-7950-43e0-90ff-98bea86e1b1d">441</intref>.</txt></block><block><txt break.before="1">If the licence has not yet been granted, see also <intref check="valid" refid="sec.802" target.guid="_951fb107-63e2-4a7d-88a5-e195517a9882">section 802</intref> and <intref check="valid" refid="sec.803" target.guid="_2c8d2aa3-d8dc-4b11-aff4-7fc962147fea">803</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_0d86a47d-552f-496a-997b-fe9b6f5c02b6" id="sec.470-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister must, after granting the <intref check="valid" refid="ch.4-pt.5" target.guid="_eab0c8dc-b6df-485f-877e-6a37095b8990">part 5</intref> permission, publish it in the gazette.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_c61cbfbd-ab93-43b8-a9ae-59bcf3049b59" id="ch.4-pt.5-div.2"><no>Division 2</no><heading guid="_8309da4a-df3b-4d1d-af2b-0a996b46e2a2" id="ch.4-pt.5-div.2-he">Effect and term of <intref check="valid" refid="ch.4-pt.5" target.guid="_eab0c8dc-b6df-485f-877e-6a37095b8990">part 5</intref> permission</heading><clause affected.by.uncommenced="0" guid="_b6401326-a6d0-448c-b518-c9cbb5a470bc" id="sec.471" provision.type="other" spent.amends="0"><no>471</no><heading guid="_467810ce-c40f-4854-9bc5-8de7092a0d90" id="sec.471-he">Effect of <intref check="valid" refid="ch.4-pt.5" target.guid="_eab0c8dc-b6df-485f-877e-6a37095b8990">part 5</intref> permission</heading><subclause affected.by.uncommenced="0" guid="_c039a164-705b-4ada-95e9-83e4a0ed8784" id="sec.471-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The effect of the <intref check="valid" refid="ch.4-pt.5" target.guid="_eab0c8dc-b6df-485f-877e-6a37095b8990">part 5</intref> permission is that, under <intref check="valid" refid="sec.399" target.guid="_7fbe28f5-08ea-4146-a14a-6c09745bc778">section 399</intref> or <intref check="valid" refid="sec.439" target.guid="_9af73335-3c60-40ed-99ba-4d0f479b3f1d">439</intref>, the land the subject of the permission becomes pipeline land or petroleum facility land for the licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_08aac2ec-9024-48ac-b70e-fae4de51b54b" id="sec.471-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The <intref check="valid" refid="ch.4-pt.5" target.guid="_eab0c8dc-b6df-485f-877e-6a37095b8990">part 5</intref> permission does not, of itself, give the holder the right to carry out authorised activities for the licence.</txt><note guid="_6df6e1f4-8036-4510-9344-bb3d3d0120f2" id="sec.471-ssec.2-note" type="example"><heading guid="_2dcc835b-db21-4553-a6c1-dee49d319caa" id="sec.471-ssec.2-note-he">Note—</heading><block><txt break.before="1">The <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-2014-047" target.guid="_78e7ee55-dcff-4087-b0b9-13497e839af3" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">chapter 3</legref> provides for how the holder may enter the land to carry out authorised activities.</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_fc95b91c-75ed-4c8f-a2ec-63defd3eb034" id="sec.472" provision.type="other" spent.amends="0"><no>472</no><heading guid="_8ffe9d84-aca0-4964-99ae-d2394dffd65e" id="sec.472-he">Term of <intref check="valid" refid="ch.4-pt.5" target.guid="_eab0c8dc-b6df-485f-877e-6a37095b8990">part 5</intref> permission</heading><subclause affected.by.uncommenced="0" guid="_7d9d59d1-0614-4838-9207-cc64da374b23" id="sec.472-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A <intref check="valid" refid="ch.4-pt.5" target.guid="_eab0c8dc-b6df-485f-877e-6a37095b8990">part 5</intref> permission ceases to be in force—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_66610691-82e8-4522-a165-7dfc1bcfb823" id="sec.472-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the land the subject of the permission becomes, other than because of the permission, pipeline land or petroleum facility land for the relevant licence; or</txt></block></li><li guid="_b2cac744-7d7c-4d56-b4a9-1eeaa444fc0b" id="sec.472-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if it is cancelled under <intref check="valid" refid="sec.473" target.guid="_b77f2a40-2c12-4fcc-9280-87a85abadf3c">section 473</intref>; or</txt></block></li><li guid="_308f85b6-e3d3-4181-9e5e-c033baa6d5a5" id="sec.472-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">9 months after it is granted.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_594cbbb4-8fa8-4738-86ed-4c0880d6d2c8" id="sec.472-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if the State has, within the 9 months, given a notice of intention to resume the land under <intref check="valid" refid="ch.4-pt.4" target.guid="_ddc9a3ac-2cbc-4995-82d3-b60fce89503b">part 4</intref>, the <intref check="valid" refid="ch.4-pt.5" target.guid="_eab0c8dc-b6df-485f-877e-6a37095b8990">part 5</intref> permission continues in force until—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1119b437-487c-4f11-8aae-6f3c339d6ada" id="sec.472-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the land is taken under <intref check="valid" refid="ch.4-pt.4" target.guid="_ddc9a3ac-2cbc-4995-82d3-b60fce89503b">part 4</intref> and it is transferred to the licence holder; or</txt></block></li><li guid="_9f75dfe0-53c5-4f00-96a1-0527c5bcb8a3" id="sec.472-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the taking of the land is discontinued.</txt></block></li></list><note guid="_33a6fc40-5a08-4cbd-9702-40b8d33be431" id="sec.472-ssec.2-note" type="example"><heading guid="_dbfcb742-74a5-441f-af6f-774285bb30aa" id="sec.472-ssec.2-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="sec.458" target.guid="_125a6292-9e16-44c0-815c-1762cb26e09e">section 458</intref> (Process for taking land) and the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="yes">Acquisition of Land Act 1967</name></legref>, <legref check="valid" jurisd="QLD" refid="pt.3" target.doc.id="act-1967-048" target.guid="_97f529e1-a1fc-4df0-8379-924bb03a55cb" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act">part 3</legref> (Discontinuance of taking of land).</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_b6025aa8-542d-41ce-aab5-62b5f8a6f011" id="sec.472-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">On the <intref check="valid" refid="ch.4-pt.5" target.guid="_eab0c8dc-b6df-485f-877e-6a37095b8990">part 5</intref> permission ceasing to be in force, the Minister must gazette a notice stating that it is no longer in force.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b77f2a40-2c12-4fcc-9280-87a85abadf3c" id="sec.473" provision.type="other" spent.amends="0"><no>473</no><heading guid="_169acb29-fdea-4e43-b6b5-b0804d6861e0" id="sec.473-he">Power to cancel <intref check="valid" refid="ch.4-pt.5" target.guid="_eab0c8dc-b6df-485f-877e-6a37095b8990">part 5</intref> permission</heading><subclause affected.by.uncommenced="0" guid="_948b9c01-d75e-4ca6-8124-c0f8a9827670" id="sec.473-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may cancel the <intref check="valid" refid="ch.4-pt.5" target.guid="_eab0c8dc-b6df-485f-877e-6a37095b8990">part 5</intref> permission at any time.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_94c81def-b486-4245-b040-587748035d9b" id="sec.473-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The cancellation takes effect when the holder is given an information notice about the decision to cancel or, if the notice states a later day of effect, on that later day.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_35ca3148-a63b-4e5f-bc52-3be991877ffc" id="ch.4-pt.6"><no>Part 6</no><heading guid="_cd3a5ce6-144a-4c1c-a498-27475b02d1cb" id="ch.4-pt.6-he">Amending licence by application</heading><clause affected.by.uncommenced="0" guid="_e2e0389c-71a6-443d-9f26-42252e635738" id="sec.474" provision.type="other" spent.amends="0"><no>474</no><heading guid="_ad300598-6b20-4c2d-92a8-32b7de858820" id="sec.474-he">Amendment applications that may be made</heading><subclause affected.by.uncommenced="0" guid="_ee86ea95-b76d-4d86-92fc-70a892069eed" id="sec.474-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A licence holder may apply for the amendment of the licence.</txt><note guid="_159f0aad-34e0-4235-94d8-9a63a350829d" id="sec.474-ssec.1-note" type="example"><heading guid="_ca48f403-0744-482c-a128-e422526c4b5b" id="sec.474-ssec.1-note-he">Examples of how a licence may be amended—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_01e199fe-e462-48a4-acd7-f2bf5b6dab9b" id="sec.474-ssec.1-note-para1" provision.type="other"><no>•</no><block><txt break.before="0">changing, removing or adding a new condition</txt></block></li><li guid="_e12a9f06-16e8-460a-bfb2-557898a9ecb8" id="sec.474-ssec.1-note-para1-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">for a pipeline or petroleum facility licence—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7d6fd878-6854-4053-85ea-a5b316c09bd8" id="sec.474-ssec.1-note-para1-oc.2-para2" provision.type="other"><no>•</no><block><txt break.before="0">changing any configuration or specification stated in the licence for the pipeline or facility; or</txt></block></li><li guid="_d9414c73-1235-42e4-9ed7-50adfa3f2531" id="sec.474-ssec.1-note-para1-oc.2-para2-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">increasing or reducing the area of the pipeline or petroleum facility land</txt></block></li></list></block></li><li guid="_321cec38-f786-4bca-9647-328a8924a219" id="sec.474-ssec.1-note-para1-oc.3" provision.type="other"><no>•</no><block><txt break.before="0">for a pipeline licence—changing a route of a pipeline or amending the licence to include the carrying out of stated pipeline licence incidental activities</txt></block></li></list></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_6492b550-d262-406e-ac24-8f04f12a2c60" id="sec.474-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite <intref check="valid" refid="sec.474-ssec.1" target.guid="_ee86ea95-b76d-4d86-92fc-70a892069eed">subsection (1)</intref>, an application can not be made to amend the licence in a way that is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7596d984-aaf3-4e28-a24a-64c98ae9a03a" id="sec.474-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">inconsistent with a mandatory condition, other than to change the completion day for construction stated in the licence; or</txt><note guid="_048c55e9-3696-4d23-a821-eb6711707915" id="sec.474-ssec.2-para1.a-note" type="example"><heading guid="_b3ad0178-1336-4122-8c1a-f8eeb0ec7a46" id="sec.474-ssec.2-para1.a-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="sec.419" target.guid="_40fac79a-f0cb-4c32-96a3-94cac60470b3">sections 419</intref> (Obligation to construct pipeline) and <intref check="valid" refid="sec.452" target.guid="_52f70733-0a09-44c5-a899-1306138dbc6c">452</intref> (Obligation to construct facility).</txt></block></note></block></li><li guid="_d668dd8f-e063-494f-baa3-273dd8a0328f" id="sec.474-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the same as, or substantially the same as, or inconsistent with, any relevant environmental condition for the licence.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_eac63cdc-a380-43b2-99f4-677877cb4737" id="sec.475" provision.type="other" spent.amends="0"><no>475</no><heading guid="_25e12624-c04c-44c4-ae51-774feff02956" id="sec.475-he">Requirements for making application</heading><block><txt break.before="1">The application must be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e27a84cb-3c42-4db0-b833-2ee5381aa686" id="sec.475-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in the approved form; and</txt></block></li><li guid="_15613caf-fe3b-4fd4-9c33-295f52ff8ca3" id="sec.475-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">accompanied by the fee prescribed under a regulation.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_d5b35a02-ad59-4186-b65a-7ae539c4e33c" id="sec.476" provision.type="other" spent.amends="0"><no>476</no><heading guid="_c65715bf-3a8a-41aa-9ed9-65e6f4a3dacb" id="sec.476-he">Notice requirements</heading><subclause affected.by.uncommenced="0" guid="_82390311-fb25-4a68-8d16-45fbaf840498" id="sec.476-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies for the application if it seeks to extend the area of the licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_309d4087-7553-40e3-8767-1eb05dbf11cb" id="sec.476-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the area is for a pipeline, <intref check="valid" refid="sec.409A" target.guid="_7da6d7a3-3d61-43ef-8c9e-31166652d766">sections 409A</intref> and <intref check="valid" refid="sec.411" target.guid="_a3c6e7f2-b35d-4f19-885f-41d1f5879fe5">411</intref> apply as if the application was a pipeline licence application for the proposed extended area.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_10cdc20d-ca15-4c95-84b3-31c24b095a15" id="sec.476-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the area is for a petroleum facility, <intref check="valid" refid="sec.445A" target.guid="_165c2769-b1a0-49e6-aad1-47df9072d8c9">section 445A</intref> applies as if the application was a petroleum facility licence application for the proposed extended area.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3e6f7e28-3c51-43a0-be9f-d1076982bd35" id="sec.477" provision.type="other" spent.amends="0"><no>477</no><heading guid="_b1453341-53f4-4436-aff9-88a045ea3665" id="sec.477-he">Deciding application</heading><subclause affected.by.uncommenced="0" guid="_368af8cd-c65e-482a-acb9-374ba0770f34" id="sec.477-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may grant or refuse the amendment.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_08e028f6-ba23-4c9f-993e-beda7b1145d0" id="sec.477-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In deciding the application, the relevant criteria under this chapter for deciding an application to obtain the licence must, to the extent they are relevant, be considered.</txt><note guid="_a83aba62-2940-4949-8e51-7211c60fb3e1" id="sec.477-ssec.2-note" type="example"><heading guid="_18f485c7-2172-428d-848c-782c60c05821" id="sec.477-ssec.2-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="sec.397" target.guid="_f7c8c758-7330-41cb-bfe6-cb729c6cbbc0">sections 397</intref>, <intref check="valid" refid="sec.415" target.guid="_ae02bb65-9f89-4ead-917c-ce9e43a0d081">415</intref> and <intref check="valid" refid="sec.448" target.guid="_acb5bbd5-5f8c-4ae8-b482-07238d5e8c71">448</intref> (Criteria for decisions).</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_f1392a66-ed6a-4e37-b0c4-21bad6acd254" id="sec.477-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister may grant the application subject to the applicant’s written agreement to the Minister amending the licence in a stated way that the Minister considers appropriate.</txt><note guid="_5eec753c-21a1-459a-91cb-234ac7a8ca37" id="sec.477-ssec.3-note" type="example"><heading guid="_7c1b137c-6c11-4984-bf65-a672d85022ef" id="sec.477-ssec.3-note-he">Examples—</heading><block><txt break.before="1">An application is to extend a pipeline or petroleum facility. The Minister may grant the application subject to the applicant agreeing in writing to the Minister amending the licence so that the extension must be completed—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4a78dfe2-cb90-471d-be4d-9062d1c2fb0e" id="sec.477-ssec.3-note-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">by a stated day; or</txt></block></li><li guid="_5c821280-c18e-4be5-a7e9-d837e6fb6e06" id="sec.477-ssec.3-note-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">in accordance with a stated standard or specification.</txt></block></li></list></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8a481764-a6b3-40d9-8057-65503b24adaa" id="sec.478" provision.type="other" spent.amends="0"><no>478</no><heading guid="_f351be1e-011d-47bc-b6f6-29892f89dc52" id="sec.478-he">Information notice about refusal</heading><block><txt break.before="1">On refusal of the application, the applicant must be given an information notice about the decision to refuse.</txt></block></clause></part><part affected.by.uncommenced="0" guid="_31e19d47-cdc3-4da1-bbe0-bdd99e18d7c4" id="ch.4-pt.7"><no>Part 7</no><heading guid="_fdb70cc5-f083-4b8a-8746-14f0ce0e3abb" id="ch.4-pt.7-he">Renewals</heading><clause affected.by.uncommenced="0" guid="_53485f38-104b-4e25-a01b-1922cd2c7552" id="sec.478A" provision.type="other" spent.amends="0"><no>478A</no><heading guid="_079432ec-ea67-4359-a154-20468874cb68" id="sec.478A-he">Survey licence can not be renewed</heading><block><txt break.before="1">A survey licence can not be renewed.</txt></block></clause><clause affected.by.uncommenced="0" guid="_6a7c46fb-e835-4a06-81c8-1c06cc616e73" id="sec.479" provision.type="other" spent.amends="0"><no>479</no><heading guid="_088b6d51-4e13-4335-b642-6919ec48a7c3" id="sec.479-he">Conditions for renewal application for other types of licence</heading><subclause affected.by.uncommenced="0" guid="_f702f0c0-08fb-4c9b-b93e-c54fa493f417" id="sec.479-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The holder of a licence, other than a survey licence, may apply to renew the licence only if none of the following is outstanding—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f19c2ec7-7dab-4086-b632-ab415aa846b4" id="sec.479-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an annual licence fee for the licence;</txt></block></li><li guid="_4d40cc11-c471-4936-b13f-a72511d6efb3" id="sec.479-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a civil penalty under <intref check="valid" refid="sec.424" target.guid="_9f46887c-2fb3-4c6d-8049-c45b79067afd">section 424</intref> or <intref check="valid" refid="sec.455" target.guid="_de4ec692-6e1d-4666-89be-d1c7e628610a">455</intref> for nonpayment of an annual licence fee;</txt></block></li><li guid="_1553e179-da5b-4b48-bacd-4826556bce1f" id="sec.479-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">interest payable under <intref check="valid" refid="sec.588" target.guid="_a4bc919c-7264-46d2-bbaa-0d47579c4e14">section 588</intref> on the annual licence fee or civil penalty;</txt></block></li><li guid="_baa8b234-1bf6-4737-b968-7d2f1cd22d3f" id="sec.479-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">security for the licence, as required under <intref check="valid" refid="sec.488" target.guid="_13f8de44-15a4-4a47-a9af-6464bc374dda">section 488</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8be38fb5-a17c-4f61-85d5-643b32ba675a" id="sec.479-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Also, the application can not be made—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_41dc6c07-a768-4f39-9559-ec4757a40428" id="sec.479-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">more than 60 business days before the end of the term of the licence; or</txt></block></li><li guid="_5ed1d42d-6e53-49ac-bc68-68e36a968508" id="sec.479-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">after the licence has ended.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f65756c1-d89c-4729-a0de-5db190d6d29b" id="sec.480" provision.type="other" spent.amends="0"><no>480</no><heading guid="_d6ca60f2-4db9-49b8-92fb-bcab62e8feb4" id="sec.480-he">Requirements for making application</heading><block><txt break.before="1">The application must be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_357f8095-7bee-4d60-bfdf-7171963548c0" id="sec.480-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in the approved form; and</txt></block></li><li guid="_fe13f4d2-950c-43bd-9d62-5a7c5eb5cf6a" id="sec.480-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state whether or not the applicant has complied with <intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref>, <intref check="valid" refid="ch.5-pt.7" target.guid="_01d524f3-ca84-4e41-ab48-d8ec12875570">part 7</intref>, for reports required to be lodged in relation to the licence; and</txt></block></li><li guid="_2b830bc6-b3fc-4f30-8631-12ca679c6816" id="sec.480-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">accompanied by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_991d2201-f757-4021-8b02-e526e80eb927" id="sec.480-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the application fee prescribed under a regulation; and</txt></block></li><li guid="_759e9ac2-fa41-415a-b9fb-7da5cfc806c2" id="sec.480-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the application is made less than 20 business days before the end of the term of the licence—an amount that is 10 times the application fee.</txt></block></li></list></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_8fbc44b0-e8a5-46d2-8865-7bafe520b746" id="sec.481" provision.type="other" spent.amends="0"><no>481</no><heading guid="_73a8c08f-bdd5-4668-a3e8-8239c8481e3c" id="sec.481-he">Continuing effect of licence for renewal application</heading><subclause affected.by.uncommenced="0" guid="_e935599f-67cf-4f65-94c0-5a5b1bc97f7b" id="sec.481-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the term of the licence ends before the application is decided.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a8f82915-451a-4a69-9227-e1d69c96b66a" id="sec.481-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite the ending of the term, the licence continues in force until the earlier of the following to happen—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_95f05606-2897-490a-b8dc-30c0ac0d8c0e" id="sec.481-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the start of any renewed term of the licence; or</txt></block></li><li guid="_d3324f0b-376d-4c67-b8f7-bf414932ecdb" id="sec.481-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a refusal of the application takes effect; or</txt></block></li><li guid="_bf25cbce-9f6d-4f32-93a2-89b1aea91283" id="sec.481-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the application is withdrawn; or</txt></block></li><li guid="_fc489492-c5ce-4794-b83b-aee419663637" id="sec.481-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the licence is cancelled under this Act.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_59855e5f-233d-4c44-b75f-0d51e34becf3" id="sec.481-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the licence is renewed, <intref check="valid" refid="sec.481-ssec.2" target.guid="_a8f82915-451a-4a69-9227-e1d69c96b66a">subsection (2)</intref> is taken never to have applied for the period from the end of the term of the licence being renewed, as stated in that licence.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c2f2d334-9dd7-4d81-aeb7-f96a51185cae" id="sec.482" provision.type="other" spent.amends="0"><no>482</no><heading guid="_8c17077e-02ac-4980-9869-aa803ee22f8a" id="sec.482-he">Deciding application</heading><subclause affected.by.uncommenced="0" guid="_2d92efa0-d9f3-40f9-9ec4-dccb5421e6f4" id="sec.482-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may grant or refuse the renewal.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_544b83e5-58a1-4c40-870d-c34f63f3bd80" id="sec.482-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the Minister must grant the renewal if the Minister considers—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d999b048-09c5-46cf-aff3-589f050c9b24" id="sec.482-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the applicant—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0d7bd8e5-2716-4ebc-a883-5bf491f696d1" id="sec.482-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">continues to be capable of carrying out authorised activities for the licence; and</txt></block></li><li guid="_95287539-42e5-44fa-80b9-e946b30fffd6" id="sec.482-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">has substantially complied with the licence; and</txt></block></li></list></block></li><li guid="_e4476857-083a-45ee-8517-4aa070d752b1" id="sec.482-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a relevant environmental authority for the renewed licence has been issued.</txt></block></li></list><note guid="_b7ddeab6-caca-4c03-8967-e02ded66f9be" id="sec.482-ssec.2-note" type="example"><heading guid="_b020af91-76ba-4057-8d56-893c118103cf" id="sec.482-ssec.2-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.30AC" target.guid="_9f663574-cdda-4e64-9f8f-6c6102041022">section 30AC</intref> in relation to acquired land that was previously in the area of the licence being renewed.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_fa165fbc-358c-49df-8d8a-82a535d9cd51" id="sec.482-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, the Minister may, as a condition of deciding to grant the application, require the applicant to do all or any of the following within a stated reasonable period—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6f8d4950-24ed-4113-9edb-0d5b7b4d368c" id="sec.482-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">pay the annual licence fee for the first year of the renewed licence;</txt></block></li><li guid="_04954c11-ea02-4a7c-ac3b-b30b6fc23b0e" id="sec.482-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give, under <intref check="valid" refid="sec.488" target.guid="_13f8de44-15a4-4a47-a9af-6464bc374dda">section 488</intref>, security for the renewed licence.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_aae145fd-e056-4de9-be50-5aade4c790af" id="sec.482-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the applicant does not comply with the requirement, the Minister may refuse the application.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1875eafe-5b18-467e-8ab3-00c5f557dca9" id="sec.483" provision.type="other" spent.amends="0"><no>483</no><heading guid="_c1ba95f9-16e0-4208-aab5-74568cdb5e44" id="sec.483-he">Provisions and term of renewed licence</heading><subclause affected.by.uncommenced="0" guid="_ebe5903b-2e69-4832-b99e-9ba4f6e74d44" id="sec.483-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The conditions of the renewed licence may be different from the conditions or other provisions of the licence being renewed.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fb3f1530-c8d0-4679-a7a1-72428e0d2483" id="sec.483-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, a takeover condition may be imposed on a renewed licence only if the licence being renewed was subject to that condition.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2e48b2b3-3ee9-45e4-a702-d8472b4c4402" id="sec.483-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The renewed licence must state its term.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_003dcdaf-691d-44d7-ac7d-8e844493a2d8" id="sec.483-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The renewed licence may also state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_41e475d9-3f5c-42d3-a389-922bf2393dd5" id="sec.483-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">conditions or other provisions of the renewed licence, other than conditions or provisions that are—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_04453d5d-4597-4e4e-b3f0-4a449aed8449" id="sec.483-ssec.4-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">inconsistent with the mandatory conditions for that type of licence; or</txt></block></li><li guid="_b56373e1-1741-46f8-bc88-22b96e1e5eda" id="sec.483-ssec.4-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the same as, or substantially the same as, or inconsistent with, any relevant environmental condition for the licence; and</txt></block></li></list></block></li><li guid="_71202f47-1266-4eb4-acf0-0052d8233741" id="sec.483-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a day for the renewed licence to take effect.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_134c946c-b049-4059-9721-362a126f4c92" id="sec.483-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">However, the provisions of the renewed licence may exclude or restrict the carrying out of an authorised activity for the licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c376cac4-7ccb-47a2-940f-553d5189b742" id="sec.483-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">If the renewed licence is decided before the end of the term of the licence being renewed as stated in that licence (the <defterm guid="_d17b62d0-2256-4fb6-9756-9b48afbefdde" id="sec.483-def.previousterm" type="definition">previous term</defterm>), the term of the renewed licence is taken to start from the end of the previous term.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_813392a3-0183-4961-8ac4-c460f846cdca" id="sec.483-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">If the renewed licence is decided after the previous term, the term of the renewed licence starts immediately after the end of the previous term, but—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_56b1a60b-1ca5-491d-b5e9-4520283fb185" id="sec.483-ssec.7-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the conditions of the renewed licence do not start until the licence holder is given notice of them; and</txt></block></li><li guid="_96910147-9834-4f01-8c4a-7fdc917b25ae" id="sec.483-ssec.7-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">until the notice is given, the conditions of the licence being renewed apply to the renewed licence as if they were its conditions.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_cb4c64df-2e7d-4939-be5b-d1e90d17414d" id="sec.484" provision.type="other" spent.amends="0"><no>484</no><heading guid="_198edbc9-283d-4cfe-a707-f69f46a25424" id="sec.484-he">Criteria for decisions</heading><block><txt break.before="1">The matters that must be considered in deciding the renewal application and the provisions of the renewed licence include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1141c297-6fd8-4144-9c11-768be89de2a0" id="sec.484-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the licence being renewed is a pipeline licence and the applicant proposes to change the pipelines the subject of the licence—the matters mentioned in <intref check="valid" refid="sec.415" target.guid="_ae02bb65-9f89-4ead-917c-ce9e43a0d081">section 415</intref> to the extent they are relevant to the change; or</txt></block></li><li guid="_47ccfa8c-8dcb-4f5e-8b10-e81177deaaea" id="sec.484-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the licence being renewed is a petroleum facility licence and the applicant proposes to change the facility—the appropriateness of the configuration, construction methods, and design for the change.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_2d3e6129-dae2-4d0e-afe0-e0449a921100" id="sec.485" provision.type="other" spent.amends="0"><no>485</no><heading guid="_887c52be-8345-4bae-ae5d-afca949ad0ba" id="sec.485-he">Information notice about refusal</heading><block><txt break.before="1">On refusal of the application, the applicant must be given an information notice about the decision to refuse.</txt></block></clause><clause affected.by.uncommenced="0" guid="_725a5fe8-ddac-4a29-ad17-ca51f753d1ef" id="sec.486" provision.type="other" spent.amends="0"><no>486</no><heading guid="_5b085ff6-ec17-411c-ba9c-951013b456a7" id="sec.486-he">When refusal takes effect</heading><block><txt break.before="1">A refusal of the application does not take effect until the end of the appeal period for the decision to refuse.</txt></block></clause></part></chapter><chapter affected.by.uncommenced="0" guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d" id="ch.5"><no>Chapter 5</no><heading guid="_edfbb804-6bff-4966-b506-128987aa8d14" id="ch.5-he">Common petroleum authority provisions</heading><note guid="_d5af982b-e271-4711-afd5-59c431436ad3" id="ch.5-note" type="example"><heading guid="_6141aa94-6ead-45ff-ad6a-88f0d1faca42" id="ch.5-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="ch.1" target.guid="_9fa221c9-58cb-4643-a6e8-9d0b9509b444">chapter 1</intref>, <intref check="valid" refid="ch.1-pt.5" target.guid="_a876929b-b0da-462e-b973-a13c93269949">part 5</intref> (General provisions for petroleum authorities) and <intref check="valid" refid="ch.14" target.guid="_7ee6daab-b446-4e66-bc06-a512720a57d9">chapter 14</intref>, <intref check="valid" refid="ch.14-pt.2" target.guid="_efd12bf3-ddcd-468a-8047-3c6b08da5b9e">part 2</intref> (Miscellaneous provisions for all authorities under Act).</txt></block></note><part affected.by.uncommenced="0" guid="_c3970261-835e-46b9-a81f-2585d91d1738" id="ch.5-pt.1"><no>Part 1</no><heading guid="_3710ef29-6ef3-4c10-a949-8b59a83ca66f" id="ch.5-pt.1-he">Security</heading><clause affected.by.uncommenced="0" guid="_7c023a91-d14c-4ef8-865e-ec2e8a2aa9a0" id="sec.487" provision.type="other" spent.amends="0"><no>487</no><heading guid="_3822c432-a58d-4f19-9bac-c43609b10ff6" id="sec.487-he">Operation and purpose of <intref check="valid" refid="ch.5-pt.1" target.guid="_c3970261-835e-46b9-a81f-2585d91d1738">pt 1</intref></heading><subclause affected.by.uncommenced="0" guid="_f52ab18e-9ebb-409d-9000-654740c99668" id="sec.487-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This part empowers the Minister to require, from time to time, the holder of a petroleum authority, or a person who has applied for a petroleum authority, to give the State security for the authority, or proposed authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2c5721a2-e427-4ed7-b2a4-f473254fb3db" id="sec.487-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The security may be used to pay—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_59ee60cf-fe76-4e68-b838-cda545239a02" id="sec.487-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">any liability under this Act that the State incurs because of an act or omission of the holder; and</txt></block></li><li guid="_8c267154-fead-42ae-b363-90a68cf8611f" id="sec.487-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">unpaid petroleum royalty or annual licence fee or rent payable by the holder to the State; and</txt></block></li><li guid="_45393f70-c1f7-4b99-9f16-4407455e2dd2" id="sec.487-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">other unpaid amounts payable under this Act by the holder to the State, including, for example, any of the following payable by the holder to the State—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_99cd4283-1609-455c-9fc8-8151e09cca66" id="sec.487-ssec.2-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">unpaid interest on unpaid petroleum royalty or annual rent;</txt></block></li><li guid="_394cdd17-c092-4cbf-8aae-6da83e079cce" id="sec.487-ssec.2-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">unpaid civil penalty or royalty penalty amount;</txt></block></li><li guid="_957ab626-0d90-440f-8e8e-458a5bc40ca5" id="sec.487-ssec.2-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">any debt payable by the holder under <intref check="valid" refid="sec.587" target.guid="_0406048f-93d0-4a37-90ea-4b2584932894">section 587</intref>; and</txt></block></li></list></block></li><li guid="_dbf79f3a-8294-43c5-aaf4-d2b08ffec7df" id="sec.487-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">any compensation the State must pay under <intref check="valid" refid="sec.584" target.guid="_c91a66ec-c73d-4303-b9b0-018287e38afa">section 584</intref> because of the exercise, or purported exercise, of a remedial power under <intref check="valid" refid="sec.580" target.guid="_818e9c24-4087-4d50-9017-6d57154a9a5c">section 580</intref> in relation to the authority, whether or not the authority has ended.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_13f8de44-15a4-4a47-a9af-6464bc374dda" id="sec.488" provision.type="other" spent.amends="0"><no>488</no><heading guid="_67e78aca-1321-40c8-a711-6fd33bc56d2f" id="sec.488-he">Power to require security for petroleum authority</heading><subclause affected.by.uncommenced="0" guid="_1c1b2835-6593-4c8e-90d7-050a5bfc601e" id="sec.488-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may require the holder of a petroleum authority, or a person who has applied for a petroleum authority, to give the State security for the authority, or proposed authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e828d1b3-e8da-4d69-b24e-4d29cbe6b152" id="sec.488-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The security must be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9010a87a-cb82-43e3-9013-d73ba48bc185" id="sec.488-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in the form prescribed under a regulation; and</txt></block></li><li guid="_68a9390c-3079-4a81-a516-b5ae36c23978" id="sec.488-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">of at least the amount prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c0017e8d-0ce1-487e-a169-9f1a32f2f901" id="sec.488-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The requirement may be made at any time.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_28453085-ec9d-4dc7-bf87-4a504fd238d8" id="sec.488-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, the requirement does not take effect until the holder or applicant is given—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2c575d5b-59e3-4ab2-a004-d4e3a814d1cc" id="sec.488-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for a requirement to give security in the form and amount prescribed under <intref check="valid" refid="sec.488-ssec.2" target.guid="_e828d1b3-e8da-4d69-b24e-4d29cbe6b152">subsection (2)</intref>—notice of the requirement; or</txt></block></li><li guid="_b4c557d1-c8ef-45d9-885c-04db6841d283" id="sec.488-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—an information notice about the decision to make the requirement.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2377e1a0-e4d8-48eb-9f1f-592d13d34d81" id="sec.489" provision.type="other" spent.amends="0"><no>489</no><heading guid="_389b6a69-de32-4a6a-b8bb-67982c668b01" id="sec.489-he">Minister’s power to require additional security</heading><subclause affected.by.uncommenced="0" guid="_1519775c-face-406b-a64c-1eb876603c1a" id="sec.489-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may, at any time, require a petroleum authority holder to increase the amount of security given for the authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_10561229-b007-41ec-9eb4-4cd750c4e5b3" id="sec.489-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_476de81c-abfe-49aa-b71f-4edefd8e8740" id="sec.489-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if, because of an increase in the prescribed amount under <intref check="valid" refid="sec.488" target.guid="_13f8de44-15a4-4a47-a9af-6464bc374dda">section 488</intref><intref check="valid" refid="sec.488-ssec.2" target.guid="_e828d1b3-e8da-4d69-b24e-4d29cbe6b152">(2)</intref>, the requirement is to increase the total security required to no more than the increased prescribed amount—the requirement must be made by notice to the holder; or</txt></block></li><li guid="_3400e18d-357c-481e-b1a3-766855b6cb4c" id="sec.489-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the requirement is to increase the total security required to more than the prescribed amount under <intref check="valid" refid="sec.488" target.guid="_13f8de44-15a4-4a47-a9af-6464bc374dda">section 488</intref><intref check="valid" refid="sec.488-ssec.2" target.guid="_e828d1b3-e8da-4d69-b24e-4d29cbe6b152">(2)</intref> when the requirement is made—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1149a4c3-7924-407c-9d11-8e14a7b7ebdc" id="sec.489-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0"><intref check="valid" refid="sec.489-ssec.3" target.guid="_4a405f05-6e93-4996-ac4a-a9b4cd91bcec">subsections (3)</intref> to <intref check="valid" refid="sec.489-ssec.6" target.guid="_23e9d947-e590-48b9-9120-0d5bc3fe9514">(6)</intref> must be complied with before making the requirement; and</txt></block></li><li guid="_bba7eb4b-6143-44d7-8c74-ec94fb4d5cde" id="sec.489-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the requirement does not take effect until the holder is given an information notice about the decision to make the requirement.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_4a405f05-6e93-4996-ac4a-a9b4cd91bcec" id="sec.489-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister must give the holder notice—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dbe8fa41-e9c4-4aaa-ad0d-fdf7dac37e93" id="sec.489-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">stating the proposed increased amount of the security for the authority; and</txt></block></li><li guid="_2fbcccf7-2d4e-4c69-aafc-85e07f81ceeb" id="sec.489-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">inviting the holder to lodge, within a stated reasonable period, submissions about the proposed increased amount.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3ce3bc66-ea3c-4109-8494-b483368d33ed" id="sec.489-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The stated period must end at least 20 business days after the holder is given the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_195550ad-7b2b-4ff1-acd1-ab34fdc64dc7" id="sec.489-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Any submissions lodged by the holder within the stated period must be considered before deciding to make the requirement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_23e9d947-e590-48b9-9120-0d5bc3fe9514" id="sec.489-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_86bb765c-4a49-4fdb-9d53-d513449cb77f" id="sec.489-ssec.6-def.security_"><txt break.before="1"><defterm guid="_d9bf94bb-1c85-48a1-b66f-d44bcc9ad258" id="sec.489-ssec.6-def.security" type="definition">security</defterm> given, includes security given or increased because of a requirement under <intref check="valid" refid="sec.489-ssec.1" target.guid="_1519775c-face-406b-a64c-1eb876603c1a">subsection (1)</intref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8dadd687-a923-42ae-99e1-84b5d5264772" id="sec.490" provision.type="other" spent.amends="0"><no>490</no><heading guid="_f88e90c1-e079-4078-838b-b22643a8c53c" id="sec.490-he">Interest on security</heading><block><txt break.before="1">The State may keep any interest that accrues on security given under this part for a petroleum authority.</txt></block></clause><clause affected.by.uncommenced="0" guid="_c98cf107-df1b-42ef-84e1-214dc0b72811" id="sec.491" provision.type="other" spent.amends="0"><no>491</no><heading guid="_e7372d0a-3c5f-4bfb-aea6-d1a55a69dbcc" id="sec.491-he">Power to use security</heading><block><txt break.before="1">The State may use security given under this part for a petroleum authority, and any interest that accrues on the security, to make a payment mentioned in <intref check="valid" refid="sec.487" target.guid="_7c023a91-d14c-4ef8-865e-ec2e8a2aa9a0">section 487</intref><intref check="valid" refid="sec.487-ssec.2" target.guid="_2c5721a2-e427-4ed7-b2a4-f473254fb3db">(2)</intref> in relation to the authority.</txt></block></clause><clause affected.by.uncommenced="0" guid="_42851287-dab5-4127-9704-f873f4d04927" id="sec.492" provision.type="other" spent.amends="0"><no>492</no><heading guid="_6de47fae-6d16-4a75-b606-c64057fc5ccd" id="sec.492-he">Replenishment of security</heading><subclause affected.by.uncommenced="0" guid="_ae0fcba3-89c1-4c00-a151-9e2a9bbb1381" id="sec.492-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies, if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_619c8ccc-c816-4eea-b01d-ffb1b4441387" id="sec.492-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">under <intref check="valid" refid="sec.491" target.guid="_c98cf107-df1b-42ef-84e1-214dc0b72811">section 491</intref>, all or part of the security for a petroleum authority has been used; and</txt></block></li><li guid="_0bc9bf73-284f-4bad-befe-7d9a681a264e" id="sec.492-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the authority is still in force.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a3cf969a-2ee6-4f31-8643-20929466e9ad" id="sec.492-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister must give the authority holder a notice—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_061a4882-3a26-4c23-a949-3ac4d7f3b287" id="sec.492-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">stating how much of the security has been used; and</txt></block></li><li guid="_06d5cc1c-0b8a-4da6-bbbf-d15a78c83f54" id="sec.492-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">directing the holder to, within 30 days after the giving of the notice, replenish the security for the authority up to the higher of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3ca01a7b-a7b7-4bf0-80a7-6e2048b2087c" id="sec.492-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the amount prescribed under a regulation;</txt></block></li><li guid="_7433b4fa-dcf6-41e1-ac13-8f7c4445e52c" id="sec.492-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the notice states that, under <intref check="valid" refid="sec.488" target.guid="_13f8de44-15a4-4a47-a9af-6464bc374dda">section 488</intref>, another amount is required—the other amount.</txt></block></li></list></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c1201b09-277c-4267-a0e3-8634ce33a1dd" id="sec.493" provision.type="other" spent.amends="0"><no>493</no><heading guid="_9cf54cf0-d5cc-4e6a-ad5b-d2794643dd29" id="sec.493-he">Security not affected by change in authority holder</heading><subclause affected.by.uncommenced="0" guid="_830b7caf-bfdd-4035-baf7-345eba0f9bc2" id="sec.493-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if security for a petroleum authority is given under this part for an authority that is still in force and there is a subsequent change in the authority holder.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_aa83b148-9ac5-4e36-8291-06fbca2805ce" id="sec.493-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite the subsequent change, the security, and any interest that accrues on it, continues for the benefit of the State and may be used under <intref check="valid" refid="sec.491" target.guid="_c98cf107-df1b-42ef-84e1-214dc0b72811">section 491</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_853500c6-f7ba-4533-b5b8-23a87581d2e3" id="sec.493-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the security is in the form of money, until the security is replaced or refunded it continues for the holder from time to time of the authority.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7529d470-a48d-4a40-92b1-3b1518b7513b" id="sec.494" provision.type="other" spent.amends="0"><no>494</no><heading guid="_06b860ef-17c9-44d9-96d8-19292aad20d4" id="sec.494-he">Retention of security after petroleum authority ends</heading><subclause affected.by.uncommenced="0" guid="_b9ad1844-ca64-44e9-8072-93228637daf8" id="sec.494-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Security, or part of security, given for a petroleum authority may be kept for 1 year after the authority has ended.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_31b43c74-e6a7-44b8-af28-c7306b98d4de" id="sec.494-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Also, if a claim made for the use of the security has not been assessed, an appropriate amount of the security to meet the claim may be kept until the claim has been assessed.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_c721e194-2c03-434e-a600-562893f05843" id="ch.5-pt.6"><no>Part 6</no><heading guid="_f6600c9d-58de-4646-b44f-207f967de237" id="ch.5-pt.6-he">Ownership of pipelines, equipment and improvements</heading><division affected.by.uncommenced="0" guid="_f9a09de7-f6f3-4393-83c9-117fc0d912ba" id="ch.5-pt.6-div.1"><no>Division 1</no><heading guid="_afe1b6b9-f837-4c51-95ab-59c2645896b6" id="ch.5-pt.6-div.1-he">Pipelines</heading><clause affected.by.uncommenced="0" guid="_5573629d-4409-4e6a-a97e-e7e82d9ddee2" id="sec.538" provision.type="other" spent.amends="0"><no>538</no><heading guid="_c8595aed-e00b-48df-95be-371a5b2f611f" id="sec.538-he">Application of <intref check="valid" refid="ch.5-pt.6-div.1" target.guid="_f9a09de7-f6f3-4393-83c9-117fc0d912ba">div 1</intref></heading><block><txt break.before="1">This division applies for a pipeline constructed or operated under a petroleum tenure or pipeline licence.</txt><note guid="_3b3f3091-11f4-4171-b9ae-a7c76596d7c9" id="sec.538-note" type="example"><heading guid="_7e70d49c-a9c4-447b-8755-fc5d5bc54434" id="sec.538-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="sec.33" target.guid="_40d20d00-5908-4940-8068-947039fa8c08">sections 33</intref> (Incidental activities) and <intref check="valid" refid="sec.110" target.guid="_f5c6eb9d-48d0-40de-8bca-ad56d12d0147">110</intref> (Construction and operation of petroleum pipelines).</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_bde12643-6411-4b46-8272-47aabb6c0856" id="sec.539" provision.type="other" spent.amends="0"><no>539</no><heading guid="_c7303936-c420-4531-bd32-952e814f11e9" id="sec.539-he">General provision about ownership while tenure or licence is in force for pipeline</heading><subclause affected.by.uncommenced="0" guid="_c3883982-5bfb-4c24-bafc-a510bf4dac20" id="sec.539-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies while the land on which the pipeline is constructed is, and continues to be, land in the area of the petroleum tenure or licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_af59fd42-e3da-484f-9f9b-6777379a2842" id="sec.539-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The pipeline is taken to be the personal property of the holder of the petroleum tenure or pipeline licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_279f8712-c492-439b-b86a-590fabb8d019" id="sec.539-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The pipeline remains the holder’s personal property despite—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_680fa3db-fb49-460e-86f1-d05ed1b74a5d" id="sec.539-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">it having become part of the land; or</txt></block></li><li guid="_8eecd853-6ed6-4b2b-a534-471b2ac8a159" id="sec.539-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the sale or other disposal of the land.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_35d6c0a6-d020-4ad4-91b8-13394a1f16db" id="sec.539-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The pipeline can not be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_038bd2b8-7802-4209-9dd7-5161d2b24ea0" id="sec.539-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">levied or seized in execution; or</txt></block></li><li guid="_3ef09bd0-c558-40e1-a579-e6f64fc98446" id="sec.539-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">sold in exercise of a power of sale or otherwise disposed of by a process under a law of a State taken against the holder, or the owner of the land.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a8aef113-09e9-4566-9869-36b9a8bba051" id="sec.539-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0"><intref check="valid" refid="sec.539-ssec.2" target.guid="_af59fd42-e3da-484f-9f9b-6777379a2842">Subsections (2)</intref> to <intref check="valid" refid="sec.539-ssec.4" target.guid="_35d6c0a6-d020-4ad4-91b8-13394a1f16db">(4)</intref> apply despite—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_db41aa1d-529d-4ee5-b3b7-66141ade63de" id="sec.539-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an Act or law of a State; or</txt></block></li><li guid="_15dc233c-ded7-4607-93ee-6d91974d6432" id="sec.539-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a contract, covenant or claim of right under a law of a State.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b58f20a9-23e4-4c52-968b-546f5ba071c3" id="sec.540" provision.type="other" spent.amends="0"><no>540</no><heading guid="_5b074df6-03c1-4978-80c3-6b9c4e114dcd" id="sec.540-he">Ownership afterwards</heading><subclause affected.by.uncommenced="0" guid="_18b3643c-6518-4852-82ad-56282783e949" id="sec.540-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0"><intref check="valid" refid="sec.539" target.guid="_bde12643-6411-4b46-8272-47aabb6c0856">Section 539</intref> applies and continues to apply for the pipeline, and for any subsequent pipeline licence for the pipeline, if the petroleum tenure or pipeline licence ends or the land on which the pipeline is constructed ceases to be in the area of the petroleum tenure or licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_98ddfbe5-6791-4f12-9893-c97b57670710" id="sec.540-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the section is subject to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fdaf3390-fd5e-4c98-a3fc-36bdd0acbd33" id="sec.540-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0"><intref check="valid" refid="sec.580" target.guid="_818e9c24-4087-4d50-9017-6d57154a9a5c">section 580</intref>; and</txt></block></li><li guid="_92bf63bf-7e25-44c1-aa5b-4279051a6db5" id="sec.540-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any condition of the former petroleum tenure or any takeover or other condition of the former licence.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2936c1b4-75cb-4a6e-8ed1-6cb13c251ed0" id="sec.540-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, if the pipeline is decommissioned under <intref check="valid" refid="sec.559" target.guid="_12ade87e-2fc7-4058-a699-e18c71c46118">section 559</intref> the petroleum tenure or licence holder, or former petroleum tenure or licence holder, may dispose of it to anyone else.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_2b3e7c24-94a6-4a50-8e63-f66e8b68bf56" id="ch.5-pt.6-div.2"><no>Division 2</no><heading guid="_ec9f7fba-6014-4ebb-a28b-c965d12b30e2" id="ch.5-pt.6-div.2-he">Equipment and improvements</heading><clause affected.by.uncommenced="0" guid="_dbc484a4-4136-44d8-acfa-ff79085b04ef" id="sec.541" provision.type="other" spent.amends="0"><no>541</no><heading guid="_3742e666-d561-4342-b27c-45f253d9627d" id="sec.541-he">Application of <intref check="valid" refid="ch.5-pt.6-div.2" target.guid="_2b3e7c24-94a6-4a50-8e63-f66e8b68bf56">div 2</intref></heading><subclause affected.by.uncommenced="0" guid="_7f845913-ad8d-4503-9f94-16d08d1acb21" id="sec.541-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This division applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6162d796-e67d-436e-a247-549d914da290" id="sec.541-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">equipment or improvements are taken, constructed or placed on land in the area of a petroleum authority; and</txt></block></li><li guid="_bfb97fa7-f88b-4ca6-b73b-930602cf9115" id="sec.541-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the equipment or improvements were taken, constructed or placed on the land for use for an authorised activity for the authority; and</txt></block></li><li guid="_91cf10fa-0bd8-436f-810a-b2cf8d1a77e5" id="sec.541-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the authority continues in force.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9fc31c13-4b28-4028-a68c-082dcc9c4158" id="sec.541-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, this division—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f862e49a-3eef-4bb0-ad1e-1e7c9fedd91b" id="sec.541-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">does not apply for a pipeline; and</txt><note guid="_e6853a3a-e307-4784-b358-6dc9af2115e7" id="sec.541-ssec.2-para1.a-note" type="example"><heading guid="_a2724ded-1dda-4fff-9833-4a81f74811b9" id="sec.541-ssec.2-para1.a-note-he">Note—</heading><block><txt break.before="1">For pipelines, see <intref check="valid" refid="sec.539" target.guid="_bde12643-6411-4b46-8272-47aabb6c0856">sections 539</intref> (General provision about ownership while tenure or licence is in force for pipeline) and <intref check="valid" refid="sec.559" target.guid="_12ade87e-2fc7-4058-a699-e18c71c46118">559</intref> (Obligation to decommission pipelines).</txt></block></note></block></li><li guid="_9f96a520-a43f-4b03-8d88-e95bfd8b383a" id="sec.541-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is subject to <intref check="valid" refid="ch.5-pt.12" target.guid="_e46164aa-e05f-4102-bfc5-019e82e36aaf">part 12</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_cec80ba6-8317-4b40-a01f-5a57c2dfacb2" id="sec.541-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_7d48b43f-6ec9-430d-8614-741f3540c90a" id="sec.541-ssec.3-def.equipment_"><txt break.before="1"><defterm guid="_1bac75ec-adbe-4556-b698-e34cc91d1a06" id="sec.541-ssec.3-def.equipment" type="definition">equipment</defterm> includes machinery and plant.</txt></definition><definition affected.by.uncommenced="0" guid="_bfa10834-b6e0-4c29-9810-14b78e749f00" id="sec.541-ssec.3-def.improvements_"><txt break.before="1"><defterm guid="_d1fff288-0c9b-4457-aa4f-8addb35eb6b3" id="sec.541-ssec.3-def.improvements" type="definition">improvements</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ecd65b1d-5b6c-4275-b06d-c87605833c0c" id="sec.541-ssec.3-def.improvements-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">does not include a petroleum well, water injection bore, water observation bore or water supply bore; but</txt></block></li><li guid="_85afbf76-3e69-4a94-a6d6-f0065751cd0c" id="sec.541-ssec.3-def.improvements-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">does include any works constructed in connection with the well or bore.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_67ab1546-3583-4a9f-9c2e-1abd93e9559b" id="sec.542" provision.type="other" spent.amends="0"><no>542</no><heading guid="_7d45f9d4-0b45-481b-9e15-962573074e39" id="sec.542-he">Ownership of equipment and improvements</heading><subclause affected.by.uncommenced="0" guid="_9aa53e6a-5ee7-4555-83d9-2964f459c965" id="sec.542-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">While the equipment or improvements are on the land, they remain the property of the person who owned them immediately before they were taken, constructed or placed on the land, unless that person otherwise agrees.</txt><note guid="_71439a83-a587-4031-b980-dd3627e18c7e" id="sec.542-ssec.1-note" type="example"><heading guid="_4e709f99-a31e-4ed4-8340-72a587169096" id="sec.542-ssec.1-note-he">Note—</heading><block><txt break.before="1">See however <intref check="valid" refid="sec.560" target.guid="_8e09f8ba-7d82-4d71-9ec8-1aaa3450a8cc">section 560</intref> (Obligation to remove equipment and improvements).</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_d3c795e5-9ba6-4427-8c16-d4e794d8a0e6" id="sec.542-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, for a petroleum well, water injection bore, water observation bore or water supply bore, <intref check="valid" refid="sec.542-ssec.1" target.guid="_9aa53e6a-5ee7-4555-83d9-2964f459c965">subsection (1)</intref> is subject to <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.10" target.guid="_6f7f9284-5836-4486-b63b-35e219633886">part 10</intref>, <intref check="valid" refid="ch.2-pt.10-div.3" target.guid="_b1c2fbaa-a819-4abc-b800-38c31a636c67">divisions 3</intref> and <intref check="valid" refid="ch.2-pt.10-div.4" target.guid="_ec68f6b5-7b11-432a-aaa3-17ee4a4c219d">4</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_78d5881b-8437-41e2-b5d4-dc540091c7e3" id="sec.542-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0"><intref check="valid" refid="sec.542-ssec.1" target.guid="_9aa53e6a-5ee7-4555-83d9-2964f459c965">Subsection (1)</intref> applies despite—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_84d14e3c-c868-4ba6-90c9-0b02f242993d" id="sec.542-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the plant or equipment having become part of the land; or</txt></block></li><li guid="_5048d339-d649-4af4-adad-b5fd893505c3" id="sec.542-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the sale or other disposal of the land.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6a4ee9cf-fce2-4c3b-b30f-7f239a49ac7b" id="sec.542-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The equipment or improvements can not be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_35827f46-ecbc-437e-b572-8dd04e304414" id="sec.542-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">levied or seized in execution; or</txt></block></li><li guid="_0bcda973-f210-4623-854b-80f18c27a268" id="sec.542-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">sold in exercise of a power of sale or otherwise disposed of by a process under a law of a State taken against the holder, or the owner of the land.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d301bd87-686b-4e29-a6c3-1316747acc7d" id="sec.542-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">This section applies despite—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_69865430-b464-4cff-aab6-f5bc630f297c" id="sec.542-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an Act or law of a State; or</txt></block></li><li guid="_50444b30-a0d5-4a97-8208-b5c8edde2e79" id="sec.542-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a contract, covenant or claim of right under a law of a State.</txt></block></li></list></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_01d524f3-ca84-4e41-ab48-d8ec12875570" id="ch.5-pt.7"><no>Part 7</no><heading guid="_96b673af-5f42-466c-88bf-f6473905534f" id="ch.5-pt.7-he">Reporting</heading><division affected.by.uncommenced="0" guid="_96471a0c-a566-4566-a6c0-6421f0c50c37" id="ch.5-pt.7-div.1"><no>Division 1</no><heading guid="_b51f7a5b-3afd-4585-bb11-b54b120b67e5" id="ch.5-pt.7-div.1-he">Reporting provisions for petroleum tenures</heading><subdivision affected.by.uncommenced="0" guid="_412c6907-0a49-41e8-b73d-7967ef61dcb8" id="ch.5-pt.7-div.1-sdiv.1"><no>Subdivision 1</no><heading guid="_9bbd5210-3bff-4319-aaee-16d22389deb2" id="ch.5-pt.7-div.1-sdiv.1-he">General provisions</heading><note guid="_e24af1c1-2076-4ef6-a9b2-1ef32caa6d37" id="ch.5-pt.7-div.1-sdiv.1-note" type="example"><heading guid="_0118c22e-aff0-4431-a853-e13719645986" id="ch.5-pt.7-div.1-sdiv.1-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.367" target.guid="_dcbc48a2-b14d-4ce7-bf78-6e5c7ec32505">section 367</intref> (Requirement for giving of copy of relinquishment report).</txt></block></note><clause affected.by.uncommenced="0" guid="_16d0db86-82e7-43cd-be10-950dfff3fb6b" id="sec.543" provision.type="other" spent.amends="0"><no>543</no><heading guid="_2a4292d7-09f9-47bb-82a3-4bdac293b8e0" id="sec.543-he">Requirement of petroleum tenure holder to report outcome of testing</heading><subclause affected.by.uncommenced="0" guid="_e75046f8-f0bb-40f5-855f-7364ea57e694" id="sec.543-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ffcb02b0-6b38-428d-8054-b5c2ccb3e995" id="sec.543-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an authority to prospect holder carries out testing under <intref check="valid" refid="sec.71A" target.guid="_4d4a223e-4703-4e99-a040-ab3ece73040e">section 71A</intref><intref check="valid" refid="sec.71A-ssec.1" target.guid="_b2f249e6-f0bc-4090-8f5d-a0e073f34c2b">(1)</intref> or <intref check="valid" refid="sec.71B" target.guid="_01de1f46-50df-428a-a2ea-6a79bb7e8c08">71B</intref><intref check="valid" refid="sec.71B-ssec.1" target.guid="_b2de4557-850f-4ef3-983d-8b4af89f443f">(1)</intref>; or</txt></block></li><li guid="_b702927b-f76d-410a-ad0a-25d4f486656b" id="sec.543-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a petroleum lease holder carries out testing under <intref check="valid" refid="sec.150A" target.guid="_28d5e4f1-45d3-4468-a0c8-c40686dec0cf">section 150A</intref><intref check="valid" refid="sec.150A-ssec.1" target.guid="_7a693512-7345-4f9e-ac80-1584a769390b">(1)</intref> or <intref check="valid" refid="sec.150C" target.guid="_c8284da4-5701-4f54-ade5-52a0612f7e9d">150C</intref><intref check="valid" refid="sec.150C-ssec.1" target.guid="_0e19e5ef-f14f-4c97-b6ce-066dc1b7c325">(1)</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_24719a22-8112-4750-9a56-a9aa285cc862" id="sec.543-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The holder must, within 40 business days after the testing ends, lodge a report stating the outcome of the test.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_9c4f6eb0-126e-4ac8-83ed-38188ea2d195" id="sec.543A" provision.type="other" spent.amends="0"><no>543A</no><heading guid="_10287112-d906-482b-b199-e39636c318b7" id="sec.543A-he">Notice about water injection bore, water observation bore or water supply bore to <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref> regulator</heading><subclause affected.by.uncommenced="0" guid="_a909db80-8926-4579-a931-e7c57b5f20f1" id="sec.543A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a person—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b283e37e-ae6f-4c9b-830c-6a1aed8ec369" id="sec.543A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">drills a water injection bore, water observation bore or water supply bore; or</txt></block></li><li guid="_6c116cba-c05d-4ef5-b363-78cee37e500a" id="sec.543A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">converts a petroleum well to a water injection bore, water observation bore or water supply bore.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_386e6be7-1a68-4b85-919e-2928b90cc590" id="sec.543A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The person must, within 60 business days after the day the drilling or conversion starts, give a notice to the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref> regulator stating the information prescribed under a regulation about the bore.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c1169e57-0472-4e0d-b8c7-34affed2b490" id="sec.545" provision.type="other" spent.amends="0"><no>545</no><heading guid="_4e9be925-9a2d-457c-b217-e7e49ce3b206" id="sec.545-he">Relinquishment report by tenure holder</heading><block><txt break.before="1">If part of the area of a petroleum tenure is relinquished as required or authorised under this Act, its holder must, within 6 months, lodge a report—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_18d15aa9-09a1-47fc-963c-f00b0dcd6d30" id="sec.545-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">describing—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1935a495-d775-477d-a8a0-759f223dad8f" id="sec.545-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the authorised activities for the tenure carried out in the part; and</txt></block></li><li guid="_b5c74f0d-1126-4de2-89eb-7eafade8e884" id="sec.545-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the results of the activities; and</txt></block></li></list></block></li><li guid="_fa7d980f-23bf-4ba4-8fd0-7836058033ac" id="sec.545-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">including other information prescribed under a regulation.</txt></block></li></list><note guid="_94023d67-2634-4107-9d31-637199c5d0b8" id="sec.545-note" type="example"><heading guid="_90184763-aa2e-49bd-935c-7698142c906e" id="sec.545-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.1" target.guid="_ae224c28-0e3b-4475-a663-d926bb3b8358">part 1</intref>, <intref check="valid" refid="ch.2-pt.1-div.4" target.guid="_a7b10fdd-8c1d-453c-9aa7-5f9db0272529">division 4</intref>, <intref check="valid" refid="ch.2-pt.1-div.4-sdiv.2" target.guid="_7ee6e428-3bad-4592-8f2c-1707222bc205">subdivision 2</intref> (Standard relinquishment condition and related provisions), <intref check="valid" refid="sec.62" target.guid="_3de82f6d-a0e1-4633-a9a2-28d63af7dcba">sections 62</intref><intref check="valid" refid="sec.62-ssec.4" target.guid="_7fccc3ae-d6ab-4608-ac61-96e0e39ced6e">(4)</intref> (Deciding application), 148 (Power to require relinquishment), 329 (Power to impose relinquishment condition) and 790 (Types of noncompliance action that may be taken).</txt></block></note></block><penalty guid="_14a8558c-4fe5-48dc-a6ff-8de8ed8ea614" id="sec.545-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></clause><clause affected.by.uncommenced="0" guid="_fd8041fb-6649-452a-a116-45dcdd8f2ade" id="sec.546" provision.type="other" spent.amends="0"><no>546</no><heading guid="_99ae639d-95fe-427a-af92-7744bfb7081c" id="sec.546-he">End of tenure report</heading><block><txt break.before="1">If a petroleum tenure or water monitoring authority ends, the person who held the tenure or authority immediately before it ended must, within 6 months, lodge a report—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_533397ff-ebd8-421c-b2d6-a7657fdd80d1" id="sec.546-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">including each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_339ae180-d0fc-4a0c-b857-5312001ad0a7" id="sec.546-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a summary of all authorised activities for the tenure or authority that have been carried out since it took effect;</txt></block></li><li guid="_337ef064-238d-4582-bba7-2809b2e55751" id="sec.546-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a summary of the results of the activities;</txt></block></li><li guid="_2e1464f9-d8f1-4699-9d88-53df5814663f" id="sec.546-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">an index of all reports lodged, as required under this Act, in relation to the activities;</txt></block></li><li guid="_bb1182b2-74ac-46f5-8354-223600a18259" id="sec.546-para1.a-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">a summary of all significant hazards created to future safe and efficient mining that, under <intref check="valid" refid="sec.706" target.guid="_a8d332d7-5795-463d-9635-62b4bac5786d">section 706</intref> or a regulation, are required to be reported;</txt></block></li><li guid="_37f2a8b9-c0ac-4721-bdbb-96614dde9f11" id="sec.546-para1.a-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">for each hazard mentioned in the summary under <intref check="valid" refid="sec.546-para1.a-para2.iv" target.guid="_bb1182b2-74ac-46f5-8354-223600a18259">subparagraph (iv)</intref>—a reference to the report that contains details of the hazard;</txt></block></li><li guid="_55f22588-fa76-4a09-9379-920ad5d2adca" id="sec.546-para1.a-para2.vi" provision.type="other"><no>(vi)</no><block><txt break.before="0">information about the amount and location of all petroleum and water produced from the area of the tenure or authority;</txt></block></li><li guid="_b9d9656b-c2ca-4ee9-a459-04fbd9d711c5" id="sec.546-para1.a-para2.vii" provision.type="other"><no>(vii)</no><block><txt break.before="0">any information related to information mentioned in <intref check="valid" refid="sec.546-para1.a-para2.vi" target.guid="_55f22588-fa76-4a09-9379-920ad5d2adca">subparagraph (vi)</intref> that may help the understanding of the amount and location of any remaining petroleum (including areas of ‘free gas’) and water from reservoirs produced;</txt></block></li><li guid="_c9e62855-bd24-4857-b9c8-bd47d726e165" id="sec.546-para1.a-para2.viii" provision.type="other"><no>(viii)</no><block><txt break.before="0">any information required to be reported under this Act that has not been previously reported; and</txt></block></li></list></block></li><li guid="_c1f6b83c-31d2-45c3-9436-85748d956c27" id="sec.546-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">stating any other information prescribed under a regulation.</txt></block></li></list></block><penalty guid="_380fa4e8-a82b-42ac-9d82-410b0269af09" id="sec.546-pen"><block><txt break.before="1">Maximum penalty—150 penalty units.</txt></block></penalty></clause><clause affected.by.uncommenced="0" guid="_307526d4-82d5-454d-a455-4946c91cae02" id="sec.546A" provision.type="other" spent.amends="0"><no>546A</no><heading guid="_e712f1cd-7337-4a54-9aa2-9e5fa293aece" id="sec.546A-he">End of authority report for data acquisition authority or survey licence</heading><subclause affected.by.uncommenced="0" guid="_2b997b89-db50-48d1-8155-ed5453c58e09" id="sec.546A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a data acquisition authority or survey licence ends.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0165a15c-26d6-4a03-afe4-5fda0b8728cc" id="sec.546A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The person who held the authority or licence immediately before it ended must, within 6 months, lodge a report about the matters relating to the former authority or licence as prescribed under a regulation.</txt></block><penalty guid="_e6e89598-9181-4878-9bb4-d34080052f9d" id="sec.546A-ssec.2-pen"><block><txt break.before="1">Maximum penalty—150 penalty units.</txt></block></penalty></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_096116ba-b565-4b44-94ed-d731c74eee4d" id="ch.5-pt.7-div.1-sdiv.2"><no>Subdivision 2</no><heading guid="_a22d764b-7c81-449f-8ee9-b4a602e664d7" id="ch.5-pt.7-div.1-sdiv.2-he">Records and samples</heading><clause affected.by.uncommenced="0" guid="_e8d80bda-e9bd-4b2c-9aab-e7b98fb7bb5d" id="sec.547" provision.type="other" spent.amends="0"><no>547</no><heading guid="_0c706883-1c3c-4ff1-94dc-4925e26cdc0b" id="sec.547-he">Requirement to keep records and samples</heading><subclause affected.by.uncommenced="0" guid="_bd514bfe-4f23-427d-baed-8ca299a15a45" id="sec.547-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A petroleum tenure holder must, for the period and in the way prescribed under a regulation, keep the records and samples about authorised activities carried out under the petroleum tenure as prescribed under a regulation.</txt></block><penalty guid="_a50ef14e-b8fb-441d-92af-75b3498b6cee" id="sec.547-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_0f229d10-924e-46ac-8402-2274252af1e8" id="sec.547-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.547-ssec.1" target.guid="_bd514bfe-4f23-427d-baed-8ca299a15a45">subsection (1)</intref>, the prescribed records may be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9251e89b-eb97-478a-9805-395a6f75fd94" id="sec.547-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">exploration data; or</txt><note guid="_26923e39-957f-438f-b17e-21e5c0296707" id="sec.547-ssec.2-para1.a-note" type="example"><heading guid="_46cdf5e3-c1e9-40ed-bfc6-d7ec75c8a6bb" id="sec.547-ssec.2-para1.a-note-he">Examples of exploration data—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_7a13c3e1-f216-492b-80a6-635f776d4501" id="sec.547-ssec.2-para1.a-note-para2" provision.type="other"><no>•</no><block><txt break.before="0">seismic acquisition and processing reports</txt></block></li><li guid="_4f79a2bf-8b8c-4f07-9181-e1277117d9ef" id="sec.547-ssec.2-para1.a-note-para2-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">information obtained from airborne geophysical surveying</txt></block></li><li guid="_1a4dee35-7b77-4e35-8a75-35b34e17d4ff" id="sec.547-ssec.2-para1.a-note-para2-oc.3" provision.type="other"><no>•</no><block><txt break.before="0">other information about petroleum or other materials at or below ground level</txt></block></li><li guid="_0e6aa5cd-f541-4562-8f10-c8635a83cdca" id="sec.547-ssec.2-para1.a-note-para2-oc.4" provision.type="other"><no>•</no><block><txt break.before="0">a well completion report for an exploration or appraisal well</txt></block></li></list></block></note></block></li><li guid="_a065724f-3e2d-431f-945e-069041a91273" id="sec.547-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">opinions, conclusions, technical consolidations and advanced interpretations based on exploration data.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7f4216c9-707d-487d-a2d2-080a3ac15a07" id="sec.548" provision.type="other" spent.amends="0"><no>548</no><heading guid="_0afe9b66-5767-43ee-8645-c9c0fc6d5966" id="sec.548-he">Requirement to lodge records and samples</heading><subclause affected.by.uncommenced="0" guid="_0d628496-01af-4be3-aedd-68da7158acc3" id="sec.548-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person who, under <intref check="valid" refid="sec.547" target.guid="_e8d80bda-e9bd-4b2c-9aab-e7b98fb7bb5d">section 547</intref>, is required to keep a record or sample, must, for the services of the State, lodge a copy of the record and a part of the sample within 6 months after the earlier of the following (the <defterm guid="_f44f8c0c-e462-49d8-9d7e-1bc77633f9e4" id="sec.548-def.requiredtime" type="definition">required time</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0aff739f-ed01-40bc-b8eb-7a7db5605032" id="sec.548-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the day the record or sample was acquired or made;</txt></block></li><li guid="_c2bf2539-a921-4255-9198-7bff8d280923" id="sec.548-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the day the relevant petroleum tenure ends.</txt></block></li></list></block><penalty guid="_34c340f2-ddae-4a43-a4a8-d5d9bfa4bb55" id="sec.548-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_10c0e48c-9f3b-4c9a-9afe-5cb795f8fbaa" id="sec.548-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The copy of the record must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d21d288b-8afe-4746-bbba-d82d840edd8a" id="sec.548-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4d43a0e4-6788-4dd7-a097-d098778a7b93" id="sec.548-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">given electronically using the system for submission of reports made or approved by the chief executive; and</txt></block></li><li guid="_5844facc-635a-417d-a150-b7df2dae1b77" id="sec.548-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">in the digital format made or approved by the chief executive; or</txt></block></li></list></block></li><li guid="_7bc60fc7-115d-4743-9bb7-beb0af8ce9ca" id="sec.548-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if a way of giving the copy is prescribed under a regulation—be given in that way.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b300ef57-7b6e-437d-9862-559abaea1cbf" id="sec.548-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive must ensure the system and a document detailing the digital format made or approved by the chief executive are available for inspection on the department’s website.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c44e9de7-9171-4e97-8626-b84a49be1bbf" id="sec.548-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The part of the sample must be lodged at the following office (the <defterm guid="_1663d932-0f2e-43b0-ae66-560a4ad1e3fa" id="sec.548-def.relevantoffice" type="definition">relevant office</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_631793de-ecba-49f7-b9af-6a473fe522e5" id="sec.548-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the office of the department for lodging the part of the sample, as stated in a gazette notice by the chief executive;</txt></block></li><li guid="_486ad8dd-0299-48e8-9d9c-3520d9672417" id="sec.548-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if no office is gazetted under <intref check="valid" refid="sec.548-ssec.4-para1.a" target.guid="_631793de-ecba-49f7-b9af-6a473fe522e5">paragraph (a)</intref>—the office of the chief executive.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_31f69fc6-d9e9-48e2-b98a-81e0154034c4" id="sec.548-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the chief executive gives the person a notice asking the person for more of the sample, the person must lodge it at the relevant office within the reasonable time stated in the notice (also the <defterm guid="_c5cb5df0-701d-483e-a545-129e7f9e6476" id="sec.548-def.requiredtime-oc.2" type="definition">required time</defterm>) unless the holder has a reasonable excuse.</txt></block><penalty guid="_f6b94e7d-3d7a-4a7a-ae41-7bf4b50e3e59" id="sec.548-ssec.5-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_bcc3b3ce-eacb-4464-8725-503098f9f817" id="sec.548-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The chief executive may extend the required time by up to 1 year if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_23c157b3-207b-4a93-ab46-76cf78ca529e" id="sec.548-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the person asks for the extension before the required time; and</txt></block></li><li guid="_2c0e1391-d65b-4d76-91a1-e9e22381cad6" id="sec.548-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the chief executive is satisfied the extension is necessary.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_4972a3d2-b483-4dfa-b6e1-ee8741d64515" id="sec.548-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">However, the extension must not end later than—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0e6542f6-fcf7-4926-bb82-c0ca3505323a" id="sec.548-ssec.7-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for <intref check="valid" refid="sec.548-ssec.1" target.guid="_0d628496-01af-4be3-aedd-68da7158acc3">subsection (1)</intref>—6 months after the required time; or</txt></block></li><li guid="_cf7d4102-ead5-4114-a569-8fc20126b2c2" id="sec.548-ssec.7-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for <intref check="valid" refid="sec.548-ssec.5" target.guid="_31f69fc6-d9e9-48e2-b98a-81e0154034c4">subsection (5)</intref>—1 year after the required time.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0edbe492-93f4-4f42-961b-450370923d36" id="sec.548-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.548-ssec.1" target.guid="_0d628496-01af-4be3-aedd-68da7158acc3">subsection (1)</intref>, the use to which the State may put the copy of the record and the part of the sample include the building of a publicly available database to facilitate petroleum exploration for the services of the State.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_95d98756-fd18-4115-a580-f41e7b004e07" id="ch.5-pt.7-div.1-sdiv.3"><no>Subdivision 3</no><heading guid="_6450090b-f723-483c-9055-25373f1efceb" id="ch.5-pt.7-div.1-sdiv.3-he">Releasing required information</heading><clause affected.by.uncommenced="0" guid="_dbcbd9cf-f788-4a2b-98a6-b4213739ef3b" id="sec.549" provision.type="other" spent.amends="0"><no>549</no><heading guid="_93bbff0c-2cc4-46e0-90ed-c20dfa1c832d" id="sec.549-he">Meaning of <defterm guid="_4cbf8368-1bb5-42c7-9ade-451b25a01380" type="mention">required information</defterm></heading><block><txt break.before="1"><defterm guid="_bbf862e7-92ea-40c7-8a06-65a421626849" id="def.Requiredinformation" type="definition">Required information</defterm>, for a petroleum tenure, is information (in any form) about authorised activities carried out under the tenure that the tenure holder has lodged under this Act, including, for example—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_751d39f3-8c89-4b78-9604-ff667d5ad746" id="sec.549-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a sample; and</txt></block></li><li guid="_deb61d79-49b3-4ae7-948e-c2462e08eeff" id="sec.549-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">data and other matters mentioned in <intref check="valid" refid="sec.553" target.guid="_aa8aa54c-46d5-4b59-a688-fae6b7998315">section 553</intref><intref check="valid" refid="sec.553-ssec.2" target.guid="_2b2c412b-cc47-40cd-8562-f5f23a2748d5">(2)</intref>.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_ee283fd3-98ba-490f-bd18-ba33cbf782e5" id="sec.550" provision.type="other" spent.amends="0"><no>550</no><heading guid="_2d0ee6ad-303f-46a3-a5b3-a1b29093899f" id="sec.550-he">Public release of required information</heading><subclause affected.by.uncommenced="0" guid="_0d445930-ba8a-4b2e-9ed2-3d0c8590b305" id="sec.550-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The mere fact of the existence of a petroleum tenure is taken to be an authorisation from its holder to the chief executive to do the following, after the end of any confidentiality period prescribed under a regulation—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_91638e51-56ed-4191-928f-d4f004093a1f" id="sec.550-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">publish, in the way prescribed under a regulation, required information for the tenure for public use, including, for example, to support petroleum exploration, production and development;</txt></block></li><li guid="_36163af1-9fc7-4f99-a2d9-a7fe3b5d75db" id="sec.550-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">on payment of a fee prescribed under a regulation, make it available to any person.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_848b247b-356e-4906-b0f1-f472a7db0590" id="sec.550-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Any confidentiality period prescribed under <intref check="valid" refid="sec.550-ssec.1" target.guid="_0d445930-ba8a-4b2e-9ed2-3d0c8590b305">subsection (1)</intref> ceases if the information is about an authorised activity carried out solely in an area that is no longer in the area of the petroleum tenure.</txt><note guid="_874715fa-9cfb-497b-94f0-4c5d0f119793" id="sec.550-ssec.2-note" type="example"><heading guid="_fd400419-7ff8-4686-a9d8-3a74a64a7eff" id="sec.550-ssec.2-note-he">Example—</heading><block><txt break.before="1">The required information is a well completion report about a well drilled on particular land in the area of an authority to prospect. <intref check="valid" refid="sec.550-ssec.1" target.guid="_0d445930-ba8a-4b2e-9ed2-3d0c8590b305">Subsection (1)</intref> ceases to apply if all of that land is relinquished under the relinquishment condition.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_de9bddcf-ce22-48f0-9249-8de9bd50a63f" id="sec.550-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The authorisation is not affected by the ending of the tenure.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8d71ef6d-9043-4fb0-b939-9c189d81a882" id="sec.551" provision.type="other" spent.amends="0"><no>551</no><heading guid="_30d177db-d31c-43fd-b238-61e3051f46f8" id="sec.551-he">Chief executive may use required information</heading><subclause affected.by.uncommenced="0" guid="_1d291fa1-8909-4a41-844c-e7287e5092a7" id="sec.551-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The mere fact of the existence of a petroleum tenure is taken to be an authorisation from its holder to the chief executive to use required information for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4512212d-3e6a-4bb7-be2e-778ac8079dae" id="sec.551-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">purposes reasonably related to this Act that are required for the tenure; or</txt></block></li><li guid="_f3aea310-095a-43dc-8cff-c31616b624a5" id="sec.551-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the services of the State.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_387cea50-3f93-46d7-9fd3-e68b1639f1c3" id="sec.551-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The authorisation is not affected by the ending of the tenure.</txt></block></subclause></clause></subdivision></division><division affected.by.uncommenced="0" guid="_129bade1-561d-4745-a67d-1e36b2e6edf7" id="ch.5-pt.7-div.2"><no>Division 2</no><heading guid="_54d1b106-9d9e-42ad-a4a3-7c67854b96b7" id="ch.5-pt.7-div.2-he">Other reporting provisions</heading><clause affected.by.uncommenced="0" guid="_822591c4-0c85-4d07-a68a-8e29a8423169" id="sec.552" provision.type="other" spent.amends="0"><no>552</no><heading guid="_9d78ef0b-95e4-43fa-b315-812920a4c2e8" id="sec.552-he">Obligation to lodge annual reports for pipeline or petroleum facility licence</heading><subclause affected.by.uncommenced="0" guid="_471e07c5-f62a-43f8-a57e-c587c6c72835" id="sec.552-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies for a pipeline licence or petroleum facility licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_aafedd60-f615-47a9-a650-271c2f45f886" id="sec.552-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The holder of the licence must, within 2 months after each of its anniversary days, lodge a report for the 12 months that ended on the last anniversary day that includes the information about the licence as prescribed under a regulation.</txt></block><penalty guid="_02b0d310-3d09-41f0-bd95-868fe6688a0f" id="sec.552-ssec.2-pen"><block><txt break.before="1">Maximum penalty—150 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_1e10a2ac-b6bc-40e0-8aa8-d0920a64c9c8" id="sec.552-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the licence ends, the person who was its holder immediately before it ended must, within 2 months, lodge a report that includes the information prescribed under <intref check="valid" refid="sec.552-ssec.2" target.guid="_aafedd60-f615-47a9-a650-271c2f45f886">subsection (2)</intref> for the period from its last anniversary day to when it ended.</txt></block><penalty guid="_11e885a9-b518-43b1-8d78-0901d9ba2fbe" id="sec.552-ssec.3-pen"><block><txt break.before="1">Maximum penalty—150 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_f65e7adc-804f-4b71-a6fe-5ef992e4c4b7" id="sec.552-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_f8c04e09-364f-44f8-9371-825b851a6bad" id="sec.552-ssec.4-def.anniversaryday_"><txt break.before="1"><defterm guid="_cd28722b-1b37-43da-8d2c-881cde9a7f44" id="sec.552-ssec.4-def.anniversaryday" type="definition">anniversary day</defterm>, for a licence, means each day that is the anniversary of the day the licence took effect.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_aa8aa54c-46d5-4b59-a688-fae6b7998315" id="sec.553" provision.type="other" spent.amends="0"><no>553</no><heading guid="_c954c89f-0851-4d24-930e-8480a9402ff4" id="sec.553-he">Power to require information or reports about authorised activities to be kept or given</heading><subclause affected.by.uncommenced="0" guid="_0efd614d-2536-4f41-a3eb-afa15576ccd9" id="sec.553-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A regulation, or the chief executive, may, for the services of the State, require a petroleum authority holder to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_782158f1-0cbe-496a-b34e-1fc06efed4af" id="sec.553-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">keep stated information, or types of information, about authorised activities carried out under the petroleum authority; or</txt><note guid="_148f245c-5c5e-4961-95bf-7cc4abcdc542" id="sec.553-ssec.1-para1.a-note" type="example"><heading guid="_a3000844-83c7-4470-bc5d-3b5186627508" id="sec.553-ssec.1-para1.a-note-he">Example of a prescribed way of keeping information—</heading><block><txt break.before="1">in a stated digital format</txt></block></note></block></li><li guid="_45498822-ed17-4ada-970d-8599d2d3af94" id="sec.553-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">lodge a notice giving stated information, or types of information, or stated reports at stated times or intervals about authorised activities carried out under the petroleum authority.</txt><note guid="_988339b0-7e00-49fc-ac9b-9b5d81cb8c8d" id="sec.553-ssec.1-para1.b-note" type="example"><heading guid="_1d12a766-8cb1-4f6d-952d-c5e1f945aae2" id="sec.553-ssec.1-para1.b-note-he">Example of a stated time—</heading><block><txt break.before="1">for a report about a petroleum well, 6 months after its completion</txt></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2b2c412b-cc47-40cd-8562-f5f23a2748d5" id="sec.553-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.553-ssec.1" target.guid="_0efd614d-2536-4f41-a3eb-afa15576ccd9">subsection (1)</intref>, the information or report required to be given or kept may be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_92e264af-f54f-4941-b009-560141177ad7" id="sec.553-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">exploration data; or</txt><note guid="_762c540b-dd02-4cd7-ab9e-bb08e7a8866d" id="sec.553-ssec.2-para1.a-note" type="example"><heading guid="_6d9bad28-e867-4129-8168-6eab4ddcf4b8" id="sec.553-ssec.2-para1.a-note-he">Examples of exploration data—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_793e9970-c2a1-4b76-a3f1-dade22bf3723" id="sec.553-ssec.2-para1.a-note-para2" provision.type="other"><no>•</no><block><txt break.before="0">seismic acquisition, processing and interpretation reports</txt></block></li><li guid="_9446d54c-d244-4155-ac5c-6107fd7ff850" id="sec.553-ssec.2-para1.a-note-para2-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">information obtained from airborne geophysical surveying</txt></block></li><li guid="_12bf01a8-ba21-4793-9703-4a2d1efcd8f3" id="sec.553-ssec.2-para1.a-note-para2-oc.3" provision.type="other"><no>•</no><block><txt break.before="0">other information about petroleum or other materials at or below ground level</txt></block></li><li guid="_adf4e2f4-5a87-4a55-82b2-dae6bb845521" id="sec.553-ssec.2-para1.a-note-para2-oc.4" provision.type="other"><no>•</no><block><txt break.before="0">a well completion report for an exploration or appraisal well</txt></block></li></list></block></note></block></li><li guid="_15eb2d8c-5737-4a06-aeab-9db2be3bccb2" id="sec.553-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">opinions, conclusions, technical consolidations and advanced interpretations based on exploration data.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a9de2018-0a15-466d-92a0-6694bae0d8c7" id="sec.553-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A notice under <intref check="valid" refid="sec.553-ssec.1" target.guid="_0efd614d-2536-4f41-a3eb-afa15576ccd9">subsection (1)</intref><intref check="valid" refid="sec.553-ssec.1-para1.b" target.guid="_45498822-ed17-4ada-970d-8599d2d3af94">(b)</intref> may state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3d871d2e-16b6-4e13-b517-3fb9edab1c29" id="sec.553-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a format required for giving the information; and</txt></block></li><li guid="_e484033b-8e04-4ff2-baaa-362ecb582abd" id="sec.553-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a degree of precision required for the giving of the information.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e0a3fb82-f285-4de4-a5c3-457e057216fe" id="sec.553-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A copy of a notice under <intref check="valid" refid="sec.553-ssec.1" target.guid="_0efd614d-2536-4f41-a3eb-afa15576ccd9">subsection (1)</intref><intref check="valid" refid="sec.553-ssec.1-para1.b" target.guid="_45498822-ed17-4ada-970d-8599d2d3af94">(b)</intref> must be given to both the owners and occupiers of affected land in the way and at the times prescribed under a regulation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b95a0530-0a7f-4eee-b0c5-2a3332221b33" id="sec.553-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">A person of whom a requirement under <intref check="valid" refid="sec.553-ssec.1" target.guid="_0efd614d-2536-4f41-a3eb-afa15576ccd9">subsection (1)</intref> has been made must comply with the requirement.</txt></block><penalty guid="_fa565c59-a6bb-4e68-9846-218c3695d07d" id="sec.553-ssec.5-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_eb8e2219-149a-4f2b-aa70-66e6e5695dea" id="sec.553-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_13333d95-714e-453f-a977-d6616f39ad32" id="sec.553-ssec.6-def.affectedland_"><txt break.before="1"><defterm guid="_7eb1ac0c-0b1b-4b00-8594-efd64f5f682f" id="sec.553-ssec.6-def.affectedland" type="definition">affected land</defterm> means land on which an authorised activity is, or has been, carried out.</txt></definition><definition affected.by.uncommenced="0" guid="_4ca23bd4-ad23-43a6-bd51-0a1482dd347b" id="sec.553-ssec.6-def.information_"><txt break.before="1"><defterm guid="_2606337b-fe7b-4ebc-a0a6-1c19f4499bf1" id="sec.553-ssec.6-def.information" type="definition">information</defterm> includes documents, records and samples.</txt></definition><definition affected.by.uncommenced="0" guid="_18b589fe-7c29-4e51-8c7c-c81b8f29efd0" id="sec.553-ssec.6-def.servicesoftheState_"><txt break.before="1"><defterm guid="_93e60e97-f016-45b6-9e6f-2de6c1b15eb4" id="sec.553-ssec.6-def.servicesoftheState" type="definition">services of the State</defterm> has the same meaning that the term has in relation to the State of Queensland under the <legref check="invalid" jurisd="CTH" type="act"><name emphasis="yes">Copyright Act 1968</name> (Cwlth)</legref>, <legref check="invalid" jurisd="CTH" refid="sec.183" type="act">section 183</legref><legref check="invalid" jurisd="CTH" refid="sec.183-ssec.1" type="act">(1)</legref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_4045b20b-f152-4652-93c6-b18a2972b5c2" id="sec.553A" provision.type="other" spent.amends="0"><no>553A</no><heading guid="_25af9a3b-c1d8-4ac3-9c02-e14c27b79a88" id="sec.553A-he">Giving copy of required notice by publication</heading><subclause affected.by.uncommenced="0" guid="_e8847492-907d-4690-b5f5-82072c2d26b6" id="sec.553A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, under <intref check="valid" refid="sec.553" target.guid="_aa8aa54c-46d5-4b59-a688-fae6b7998315">section 553</intref><intref check="valid" refid="sec.553-ssec.4" target.guid="_e0a3fb82-f285-4de4-a5c3-457e057216fe">(4)</intref>, a regulation requires a petroleum authority holder to give owners and occupiers of affected land a copy of a notice about authorised activities carried out under the petroleum authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_948d5395-b95d-459b-a789-803e430855e5" id="sec.553A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may approve the petroleum authority holder giving the notice by publishing it in a stated way.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_acccc9e5-dd2d-4ddb-a82c-d52d5a484802" id="sec.553A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The publication may relate to more than 1 notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7c004fcf-3d94-48cd-841d-f88d17d73f6f" id="sec.553A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive may give the approval only if satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b9136567-fa20-4761-bc1b-9977cb972cef" id="sec.553A-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the notice is required to be given before an authorised activity is carried out—the publication is reasonably likely to adequately inform the owner or occupier of affected land at least 10 business days before the authorised activity is carried out; or</txt></block></li><li guid="_a9af1d60-cb26-4d79-8ddc-1edf6712e716" id="sec.553A-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the notice is required to be given after an authorised activity is carried out—the publication is reasonably likely to adequately inform the owner or occupier of affected land.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_25095ccf-26f5-457b-8da8-3131b86fd0ab" id="sec.553A-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the chief executive approves the giving of the notice under <intref check="valid" refid="sec.553A-ssec.2" target.guid="_948d5395-b95d-459b-a789-803e430855e5">subsection (2)</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_752d5011-6223-4929-b2bd-d98a1ce19e88" id="sec.553A-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the notice may state where a copy of further information referred to in the publication may be obtained, or inspected, free of charge; and</txt></block></li><li guid="_02541c0e-2c54-4e29-9a8d-123518b166f6" id="sec.553A-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder is not required to comply with <intref check="valid" refid="sec.553" target.guid="_aa8aa54c-46d5-4b59-a688-fae6b7998315">section 553</intref><intref check="valid" refid="sec.553-ssec.4" target.guid="_e0a3fb82-f285-4de4-a5c3-457e057216fe">(4)</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2b3b926f-63e4-420f-8c04-45f6f65578cf" id="sec.553A-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_78325902-5b09-4bd4-b897-1e082acbe28c" id="sec.553A-ssec.6-def.affectedland_"><txt break.before="1"><defterm guid="_e60075db-b540-4445-808e-00c0bf70186b" id="sec.553A-ssec.6-def.affectedland" type="definition">affected land</defterm> means land on which an authorised activity is, or has been, carried out.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_82e30648-3a29-4049-806e-61818bf53c92" id="sec.553B" provision.type="other" spent.amends="0"><no>553B</no><heading guid="_c2f3794a-5d7b-4391-9d99-58d2f8fddc38" id="sec.553B-he">Copy of particular notices for chief executive (environment)</heading><subclause affected.by.uncommenced="0" guid="_4a0e80ec-0a1a-48dc-952f-7ee654d180d0" id="sec.553B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3f015b6c-c1bc-4c97-87f0-360f239391d4" id="sec.553B-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a regulation requires a petroleum authority holder to lodge a notice under <intref check="valid" refid="sec.553" target.guid="_aa8aa54c-46d5-4b59-a688-fae6b7998315">section 553</intref><intref check="valid" refid="sec.553-ssec.1" target.guid="_0efd614d-2536-4f41-a3eb-afa15576ccd9">(1)</intref><intref check="valid" refid="sec.553-ssec.1-para1.b" target.guid="_45498822-ed17-4ada-970d-8599d2d3af94">(b)</intref>; and</txt></block></li><li guid="_7e423934-765c-475b-b05b-b08d63bfdc2f" id="sec.553B-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the petroleum authority holder lodges the notice as required.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_151940eb-4ae4-497c-9563-0e04b8b3beb6" id="sec.553B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive must give the chief executive (environment) a copy of the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4ad25f84-c8a4-4479-ac15-69db5eae93b8" id="sec.553B-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_b13f6527-cdb6-4bd4-8081-c37802d32f67" id="sec.553B-ssec.3-def.chiefexecutiveenvironment_"><txt break.before="1"><defterm guid="_96d590cb-cfd6-4444-93cb-e405095f91e9" id="sec.553B-ssec.3-def.chiefexecutiveenvironment" type="definition">chief executive (environment)</defterm> means the chief executive of the department in which the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act"><name emphasis="yes">Environmental Protection Act 1994</name></legref> is administered.</txt></definition></deflist></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_6fd5c183-bb2d-498f-bceb-5e0aff62d198" id="ch.5-pt.8"><no>Part 8</no><heading guid="_03b2ecd5-6397-4683-9e91-7f4e372228f3" id="ch.5-pt.8-he">General provisions for conditions and authorised activities</heading><division affected.by.uncommenced="0" guid="_cd111e10-435a-4566-ab35-5124a2e0fc56" id="ch.5-pt.8-div.1"><no>Division 1</no><heading guid="_b27d05e8-9752-4da1-aa54-ff4590104456" id="ch.5-pt.8-div.1-he">Other mandatory conditions for all petroleum authorities</heading><clause affected.by.uncommenced="0" guid="_6d2f93f5-c459-4cb6-956c-03512eb95331" id="sec.554" provision.type="other" spent.amends="0"><no>554</no><heading guid="_f3bd704b-7d17-40bf-a896-04f9f6199cb3" id="sec.554-he">Operation of <intref check="valid" refid="ch.5-pt.8-div.1" target.guid="_cd111e10-435a-4566-ab35-5124a2e0fc56">div 1</intref></heading><block><txt break.before="1">This division provides for general mandatory conditions for all petroleum authorities.</txt><note guid="_dae96f2c-a2fd-46ac-861f-a3eed87fc422" id="sec.554-note" type="example"><heading guid="_09497ed5-8db9-4cdc-9906-5cd42bbd0be9" id="sec.554-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_5f597428-0e10-4ed1-830e-b44d6a48890e" id="sec.554-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">The following provisions also impose mandatory conditions on all petroleum authorities—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ccc865d1-0478-4c86-bb0a-3726ded01d80" id="sec.554-note-para1.1-para2" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.1" target.guid="_ae224c28-0e3b-4475-a663-d926bb3b8358">part 1</intref>, <intref check="valid" refid="ch.2-pt.1-div.1" target.guid="_7e16aebd-feb5-4967-a527-9711adb9ae66">divisions 1</intref> and <intref check="valid" refid="ch.2-pt.1-div.4" target.guid="_a7b10fdd-8c1d-453c-9aa7-5f9db0272529">4</intref></txt></block></li><li guid="_4412dc2a-0b13-40ad-94e5-7c2879e32663" id="sec.554-note-para1.1-para2-oc.2" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.2" target.guid="_f0429453-3af6-43cd-a6dd-cfc8b78be0a9">part 2</intref>, <intref check="valid" refid="ch.2-pt.2-div.1" target.guid="_526a1e56-68ca-4b89-b8fb-4be7083ed4eb">divisions 1</intref> and <intref check="valid" refid="ch.2-pt.2-div.5" target.guid="_659d1ea0-0fed-489d-90b6-75ae32c26ef7">5</intref></txt></block></li><li guid="_75dbfbc1-77ec-43db-81ad-a945df45649e" id="sec.554-note-para1.1-para2-oc.3" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.10" target.guid="_6f7f9284-5836-4486-b63b-35e219633886">part 10</intref></txt></block></li><li guid="_1415b42c-5b67-47a2-8e20-62bb123c2f33" id="sec.554-note-para1.1-para2-oc.4" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="ch.3" target.guid="_7d989cb7-da2a-4737-842c-bd1944dbb54e">chapter 3</intref>, <intref check="valid" refid="ch.3-pt.4" target.guid="_524d4f73-dd39-49b3-b4c7-37b171f90dd6">part 4</intref>, <intref check="valid" refid="ch.3-pt.4-div.4" target.guid="_05c78981-f7e7-4468-94ee-9e7bfbc35754">division 4</intref></txt></block></li><li guid="_69dfa556-6662-4b56-964d-02be55bdb67c" id="sec.554-note-para1.1-para2-oc.5" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref>.</txt></block></li></list></block></li><li guid="_27bb2f79-6a3a-4490-b8f6-2fd5b787e8cf" id="sec.554-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">For what is a mandatory condition, see <intref check="valid" refid="sec.20" target.guid="_746e989f-44f2-4d9b-9550-13495b74b131">section 20</intref><intref check="valid" refid="sec.20-ssec.2" target.guid="_6716699a-7cd3-4f35-945e-49a35a3ccdd3">(2)</intref>.</txt></block></li></list></block></note></block></clause><clause affected.by.uncommenced="0" guid="_d6bc2280-5f1d-4ffe-ab1c-b5e37b3939f9" id="sec.555" provision.type="other" spent.amends="0"><no>555</no><heading guid="_ce7f9257-827c-497d-a887-8bcd68f57598" id="sec.555-he">Compliance with land access code</heading><block><txt break.before="1">A petroleum authority holder must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7e3a4938-7443-4e94-94c5-7075a02375c9" id="sec.555-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">comply with the mandatory provisions of the land access code to the extent it applies to the holder; and</txt></block></li><li guid="_d7d017c1-b3b3-4f33-946b-b393bbc4325d" id="sec.555-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">ensure any other person carrying out an authorised activity for the petroleum authority complies with the mandatory provisions of the land access code.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_275a3420-b674-47b8-a985-0140d4ef8dd4" id="sec.557" provision.type="other" spent.amends="0"><no>557</no><heading guid="_73205fad-389e-48a3-9584-767f52503dd9" id="sec.557-he">Obligation to comply with Act and prescribed standards</heading><subclause affected.by.uncommenced="0" guid="_dbc11254-2b51-4355-8f48-da8d6f0c7e2e" id="sec.557-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The holder of a petroleum authority must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3a188c59-2b39-4c1d-8bb9-c844b83b7a4a" id="sec.557-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">comply with this Act; and</txt></block></li><li guid="_db5c8880-cf34-41bf-9c29-1b2a8afc1319" id="sec.557-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">in carrying out an authorised activity for the authority, comply with—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4cec6a46-89c6-4637-a3a6-e21edcd3d249" id="sec.557-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">any standard that the authority provides for the activity; and</txt></block></li><li guid="_80681b5b-4efd-4401-b38e-2290ecdab7f4" id="sec.557-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">to the extent that the authority does not provide a standard for the activity—any standard prescribed under a regulation for carrying out the activity.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7e01c40a-6aec-4adc-bd0b-54c2a51b1606" id="sec.557-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_11730653-4850-473a-af52-da97f4a2c47d" id="sec.557-ssec.2-def.standard_"><txt break.before="1"><defterm guid="_2ffb77bd-c7ef-4782-9425-6d8fcc446cb4" id="sec.557-ssec.2-def.standard" type="definition">standard</defterm> includes an Australian Standard, an international standard or a code or protocol.</txt><note guid="_59a7012b-d6c2-418a-a73f-0260370b52ff" id="sec.557-ssec.2-def.standard-note" type="example"><heading guid="_dc13987c-e619-435b-b834-827e0de3dd2c" id="sec.557-ssec.2-def.standard-note-he">Note—</heading><block><txt break.before="1">For prescribed standards for GHG stream pipelines in the area of a GHG tenure, see the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.331" target.doc.id="act-2009-003" target.guid="_23af4b49-d71a-4b15-b5f7-08207a109272" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act">section 331</legref>.</txt></block></note></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_4049be23-e294-464b-b1ff-e33c11376c04" id="sec.558" provision.type="other" spent.amends="0"><no>558</no><heading guid="_d007d0ca-c5fd-450d-b8ee-28852bbc4b04" id="sec.558-he">Obligation to survey if Minister requires</heading><subclause affected.by.uncommenced="0" guid="_b31bbe44-8a7c-4121-adf6-4c87573f2015" id="sec.558-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may, by notice to the holder of a petroleum authority, require the holder to survey or resurvey the area of the authority within a stated reasonable period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d5b9a32c-dd80-42f0-aeaa-1be2ce59e100" id="sec.558-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The holder must cause the survey or resurvey to be carried out by a person registered as a cadastral surveyor under the <legref check="valid" jurisd="QLD" target.doc.id="act-2003-070" target.version.series="58bf4472-9a2d-4809-9f04-c4ff625373da" type="act"><name emphasis="yes">Surveyors Act 2003</name></legref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b89855ca-b034-43f4-87f7-0319643c7c6a" id="sec.558-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The holder must pay any costs incurred in complying with the notice.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_3616ff0f-66d7-41d2-a769-7e6bf4a1877d" id="ch.5-pt.8-div.2"><no>Division 2</no><heading guid="_8ccff515-ccce-42e2-88f0-b05a35f9d39a" id="ch.5-pt.8-div.2-he">Provisions for when authority ends or area reduced</heading><clause affected.by.uncommenced="0" guid="_12ade87e-2fc7-4058-a699-e18c71c46118" id="sec.559" provision.type="other" spent.amends="0"><no>559</no><heading guid="_3865a2a1-ee02-4327-8fbf-a7734048b301" id="sec.559-he">Obligation to decommission pipelines</heading><subclause affected.by.uncommenced="0" guid="_b9390c52-8543-49f8-9d60-e047fbe67862" id="sec.559-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The holder of a petroleum authority must, before the decommissioning day, decommission, in the way prescribed under a regulation, any pipeline in the area of the authority.</txt></block><penalty guid="_b5db776a-08cc-442a-b30f-7b8726f9ca12" id="sec.559-ssec.1-pen"><block><txt break.before="1">Maximum penalty—2,000 penalty units.</txt></block></penalty><note guid="_7bfdb36e-55bb-4b10-9d43-e414bff6162e" id="sec.559-ssec.1-note" type="example"><heading guid="_9782d9e7-35bb-434f-8e28-90e943cd6449" id="sec.559-ssec.1-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_3b9da923-d117-427a-bcd5-ad9d91a5f1ce" id="sec.559-ssec.1-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">See also <intref check="valid" refid="sec.539" target.guid="_bde12643-6411-4b46-8272-47aabb6c0856">section 539</intref><intref check="valid" refid="sec.539-ssec.3" target.guid="_279f8712-c492-439b-b86a-590fabb8d019">(3)</intref> and <intref check="valid" refid="sec.539-ssec.4" target.guid="_35d6c0a6-d020-4ad4-91b8-13394a1f16db">(4)</intref> (General provision about ownership while tenure or licence is in force for pipeline).</txt></block></li><li guid="_bff477a4-0879-41f6-98c0-66c6c28e2697" id="sec.559-ssec.1-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></li></list></block></note></subclause><subclause affected.by.uncommenced="0" guid="_da10c14f-e9fc-45af-9870-56ed66b255c7" id="sec.559-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.559-ssec.1" target.guid="_b9390c52-8543-49f8-9d60-e047fbe67862">subsection (1)</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_563fa0b5-1c6a-420a-9e87-685f084fe189" id="sec.559-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">does not apply if the pipeline was constructed or operated under another petroleum authority; and</txt></block></li><li guid="_c76a085e-3f3b-4d06-9369-1a19f2fc8d7b" id="sec.559-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">ceases to apply if the operation of the pipeline becomes an authorised activity for another petroleum authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_db91816c-8732-4d3d-950c-5d40f10ff614" id="sec.559-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, <intref check="valid" refid="sec.559-ssec.1" target.guid="_b9390c52-8543-49f8-9d60-e047fbe67862">subsection (1)</intref> does not apply for a pipeline if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7035c508-3c10-45f9-8c67-41bc394be1a9" id="sec.559-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the petroleum authority is a pipeline licence; and</txt></block></li><li guid="_cf76da78-9b21-4d3b-b4ca-36f37207ac16" id="sec.559-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the licence is surrendered or otherwise ends for the purpose of the pipelines the subject of the licence becoming the subject of another pipeline licence.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0ac1c14f-1e47-4676-81e4-c521b3209504" id="sec.559-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_dd9c260a-22da-461c-afce-bce556d01826" id="sec.559-ssec.4-def.decommissioningday_"><txt break.before="1"><defterm guid="_033cef20-26b4-4587-b841-971f4b22e9b2" id="sec.559-ssec.4-def.decommissioningday" type="definition">decommissioning day</defterm> means the later of the following days—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_09505637-d319-427d-bab4-759cbca3eef3" id="sec.559-ssec.4-def.decommissioningday-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the earlier of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c4469bb1-0415-4a6c-b6b0-242417b71cba" id="sec.559-ssec.4-def.decommissioningday-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the day the authority ends;</txt></block></li><li guid="_bf66a54f-2813-4796-b7d2-967e30a27ef4" id="sec.559-ssec.4-def.decommissioningday-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the day the land ceases to be in the area of the authority;</txt></block></li></list></block></li><li guid="_a0dcaa7f-9bb1-4fba-aa7c-518a8eb8cb4b" id="sec.559-ssec.4-def.decommissioningday-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if, before the day provided for under <intref check="valid" refid="sec.559-ssec.4-def.decommissioningday-para1.a" target.guid="_09505637-d319-427d-bab4-759cbca3eef3">paragraph (a)</intref>, the Minister fixes a day—that day;</txt></block></li><li guid="_efdf1c40-d78d-4b05-b641-48196c804ddb" id="sec.559-ssec.4-def.decommissioningday-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if, before a day fixed under <intref check="valid" refid="sec.559-ssec.4-def.decommissioningday-para1.b" target.guid="_a0dcaa7f-9bb1-4fba-aa7c-518a8eb8cb4b">paragraph (b)</intref>, the Minister fixes a later day—that day.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8e09f8ba-7d82-4d71-9ec8-1aaa3450a8cc" id="sec.560" provision.type="other" spent.amends="0"><no>560</no><heading guid="_a38b9b8a-401f-4129-b694-c557e1241d07" id="sec.560-he">Obligation to remove equipment and improvements</heading><subclause affected.by.uncommenced="0" guid="_23e90983-3805-4167-b6a4-64469f8c0d5f" id="sec.560-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies for equipment or improvements in the area of a petroleum authority or on access land for the authority that are being, or have been, used for an authorised activity for the authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_81f3c7c1-fac2-4e85-80c6-d630f9ab67a6" id="sec.560-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, this section does not apply for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f3ce8da6-39b4-4fb4-8613-10746cfc0a7d" id="sec.560-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a petroleum well, pipeline, water injection bore, water observation bore or water supply bore; or</txt><note guid="_6186f894-487f-4e00-b310-d4b0a28a8ef1" id="sec.560-ssec.2-para1.a-note" type="example"><heading guid="_90967896-24b7-40b6-bfa5-7fb0d6839eb2" id="sec.560-ssec.2-para1.a-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_04ea3334-f504-4bbd-88eb-ca03a61ede39" id="sec.560-ssec.2-para1.a-note-para2.1" provision.type="other"><no>1</no><block><txt break.before="0">For petroleum wells, water injection bores, water observation bores and water supply bores, see <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.10" target.guid="_6f7f9284-5836-4486-b63b-35e219633886">part 10</intref>.</txt></block></li><li guid="_bcb87512-ef7e-4eb0-a909-05c92cf37c82" id="sec.560-ssec.2-para1.a-note-para2.2" provision.type="other"><no>2</no><block><txt break.before="0">For pipelines, see <intref check="valid" refid="sec.539" target.guid="_bde12643-6411-4b46-8272-47aabb6c0856">sections 539</intref> and <intref check="valid" refid="sec.559" target.guid="_12ade87e-2fc7-4058-a699-e18c71c46118">559</intref>.</txt></block></li></list></block></note></block></li><li guid="_87685413-f9e0-4703-bdb5-8932927a86b3" id="sec.560-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">equipment or improvements on land that, under <intref check="valid" refid="sec.101" target.guid="_ecb16f24-7357-4c3c-87b6-6fbc88f80008">section 101</intref>, ceases to be in the area of an authority to prospect.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a8bfddd0-cf5e-443a-8aab-aac38ae74764" id="sec.560-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The authority holder must, before the removal day, remove the equipment or improvements from the land, unless the owner of the land otherwise agrees.</txt></block><penalty guid="_e520be1b-4f0f-4415-b18a-224264ac6c55" id="sec.560-ssec.3-pen"><block><txt break.before="1">Maximum penalty—1,000 penalty units.</txt></block></penalty><note guid="_d6b92b08-7933-4add-822d-3710393beaad" id="sec.560-ssec.3-note" type="example"><heading guid="_c606dd89-8242-4382-9ef0-4b59861c1918" id="sec.560-ssec.3-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_46273092-b310-4c7d-8434-4da1c230fa87" id="sec.560-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">To remove any doubt, it is declared that <intref check="valid" refid="sec.560-ssec.3" target.guid="_a8bfddd0-cf5e-443a-8aab-aac38ae74764">subsection (3)</intref> applies even if the equipment or improvements are not owned by the holder.</txt><note guid="_bb7f1627-7225-4e8a-a860-fa17175ea6ed" id="sec.560-ssec.4-note" type="example"><heading guid="_665214bf-8940-49d9-8843-61b0af31cc07" id="sec.560-ssec.4-note-he">Note—</heading><block><txt break.before="1">For ownership of the equipment or improvements, see <intref check="valid" refid="sec.542" target.guid="_67ab1546-3583-4a9f-9c2e-1abd93e9559b">section 542</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_4625e6fe-3047-4464-bf21-5d9078488542" id="sec.560-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_a4a577ba-d6c6-4c86-a6e7-c4bf20e8e0f2" id="sec.560-ssec.5-def.equipment_"><txt break.before="1"><defterm guid="_4f45bde0-a84a-4542-9311-a914ec910fef" id="sec.560-ssec.5-def.equipment" type="definition">equipment</defterm> includes machinery and plant.</txt></definition><definition affected.by.uncommenced="0" guid="_0ff1fa5d-0050-4ed9-8940-2a1d9fbec838" id="sec.560-ssec.5-def.removalday_"><txt break.before="1"><defterm guid="_9f82da58-9862-4e5d-8f45-7e0c50bf4a26" id="sec.560-ssec.5-def.removalday" type="definition">removal day</defterm> means the later of the following days—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_56d10a9e-e52e-400c-96ce-21e8edf15a0a" id="sec.560-ssec.5-def.removalday-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the earlier of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_979e5c30-74b6-4181-82b3-1354cf7ef36a" id="sec.560-ssec.5-def.removalday-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the day the authority ends;</txt></block></li><li guid="_2260a3ab-9a86-4e81-ba9c-d7f3d9a3a26c" id="sec.560-ssec.5-def.removalday-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the day the land ceases to be in the area of the authority;</txt></block></li></list></block></li><li guid="_8b021c31-df07-4507-91b8-b9849d83809f" id="sec.560-ssec.5-def.removalday-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if, before the day provided for under <intref check="valid" refid="sec.560-ssec.5-def.removalday-para1.a" target.guid="_56d10a9e-e52e-400c-96ce-21e8edf15a0a">paragraph (a)</intref>, the Minister fixes a day—that day;</txt></block></li><li guid="_9a550b10-1bc4-4bcc-a74e-3ab92c974323" id="sec.560-ssec.5-def.removalday-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if, before a day fixed under <intref check="valid" refid="sec.560-ssec.5-def.removalday-para1.b" target.guid="_8b021c31-df07-4507-91b8-b9849d83809f">paragraph (b)</intref>, the Minister fixes a later day—that day.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_607b2a8a-317a-47d4-88f8-d1bad5d6530a" id="sec.561" provision.type="other" spent.amends="0"><no>561</no><heading guid="_8d05fa92-c85c-4052-89b6-5112757c69bc" id="sec.561-he">Authorisation to enter to facilitate compliance with <intref check="valid" refid="sec.555" target.guid="_d6bc2280-5f1d-4ffe-ab1c-b5e37b3939f9">s 555</intref> or this division</heading><subclause affected.by.uncommenced="0" guid="_44fafc23-d39c-4330-bc1a-c3dad4691cda" id="sec.561-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may, by notice, authorise a former holder of a petroleum authority to enter any of the following land to comply with, or remedy a contravention of, <intref check="valid" refid="sec.555" target.guid="_d6bc2280-5f1d-4ffe-ab1c-b5e37b3939f9">section 555</intref> or this division—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_317b150a-ddf3-4161-abd7-f71b7c5dab7c" id="sec.561-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the land to which <intref check="valid" refid="sec.555" target.guid="_d6bc2280-5f1d-4ffe-ab1c-b5e37b3939f9">section 555</intref> or this division applies (<defterm guid="_cdad9367-40c7-461a-a80c-ab7eb9851799" id="sec.561-ssec.1-def.primaryland" type="definition">primary land</defterm>);</txt></block></li><li guid="_43d8d245-2097-41a1-a78e-e103f385b8b0" id="sec.561-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any other land (<defterm guid="_bb5638bc-3ce3-4f3c-b468-d82e3c8a9282" id="sec.561-ssec.1-def.secondaryland" type="definition">secondary land</defterm>) necessary or desirable to cross for access to the primary land.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_811c40d8-3adf-41db-87b8-aea3438ec949" id="sec.561-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.20" target.guid="_746e989f-44f2-4d9b-9550-13495b74b131">Sections 20</intref> and <intref check="valid" refid="sec.557" target.guid="_275a3420-b674-47b8-a985-0140d4ef8dd4">557</intref> and the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-2014-047" target.guid="_78e7ee55-dcff-4087-b0b9-13497e839af3" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">chapter 3</legref>, <legref check="valid" jurisd="QLD" refid="ch.3-pt.2" target.doc.id="act-2014-047" target.guid="_adcc85c6-c389-49c8-b998-858dca31ac1f" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">parts 2</legref>, <legref check="invalid" jurisd="QLD" type="act">3</legref> and <legref check="invalid" jurisd="QLD" type="act">7</legref> apply to the former holder for the purpose of the authorisation as if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ddc2174e-c732-4faa-9b36-8aa295b4f096" id="sec.561-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the authority were still in force (the <defterm guid="_80b9b2cf-5c34-48ae-9241-fb458dde993a" id="sec.561-ssec.2-def.notionalauthority" type="definition">notional authority</defterm>); and</txt></block></li><li guid="_bcb69aec-1688-409d-9239-45cd79e24f26" id="sec.561-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the former holder is the holder of the notional authority; and</txt></block></li><li guid="_ab4226fe-7cbb-4357-ade0-e85640aec30e" id="sec.561-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the primary land and any secondary land are in the area of the notional authority; and</txt></block></li><li guid="_215cbcfa-060c-4810-a338-dfd318bd178e" id="sec.561-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the compliance or the remedying of the contravention were authorised activities for the notional authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d559b23f-caad-4a9f-bcda-3ecc5826b22a" id="sec.561-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the power under this section does not include the power to enter a structure, or a part of a structure, used for residential purposes without the consent of the occupier of the structure or part of the structure.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ef1fd433-aa04-4d36-9784-47d43b15fe03" id="sec.561-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the former holder intends to enter the land and any occupier of the land is present at the land, the former holder also must show, or make a reasonable attempt to show, the occupier the former holder’s authorisation under this section.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_94ac22dd-c214-454c-bd61-8675a28289f3" id="ch.5-pt.8-div.3"><no>Division 3</no><heading guid="_46e7b746-44b9-4648-a988-e2ac5504c40a" id="ch.5-pt.8-div.3-he">Provisions for authorised activities</heading><clause affected.by.uncommenced="0" guid="_5f70dba0-9298-4b7d-be74-11caad21eb37" id="sec.562" provision.type="other" spent.amends="0"><no>562</no><heading guid="_f5120822-886d-4c1d-8786-739aa4dddd26" id="sec.562-he">General restriction on carrying out authorised activities</heading><block><txt break.before="1">The carrying out of an authorised activity for a petroleum authority is subject to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_49813067-c063-4a9e-875e-f8fd2a3eee53" id="sec.562-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the provisions of the authority; and</txt></block></li><li guid="_c83a8921-9cb2-4b8c-b6da-0514097a1bd5" id="sec.562-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">compliance with the authority holder’s rights and obligations under this chapter and chapters 2, 3, 4 and 9.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_67d472c3-9467-468b-8bb0-c21101321b5e" id="sec.563" provision.type="other" spent.amends="0"><no>563</no><heading guid="_c1747707-ef91-4950-aec4-43a0cbfb476b" id="sec.563-he">Who may carry out authorised activity for petroleum authority holder</heading><subclause affected.by.uncommenced="0" guid="_f3c5238c-2b43-4183-bbcc-bcd12796d5b7" id="sec.563-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An authorised activity for a petroleum authority may be carried out for the holder by any of the following persons acting within the scope of the person’s authority from the holder—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bbd25bc5-1cca-4391-9f0d-a295ef9ec762" id="sec.563-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the holder is a corporation—its officers and employees;</txt></block></li><li guid="_e382a17a-2744-48ed-a421-11c67d99bb96" id="sec.563-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder’s employees or partners who are individuals;</txt></block></li><li guid="_3c6149d9-a1ef-4f6c-bdf3-5090e1fdd01a" id="sec.563-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">agents of, or contractors for, the holder;</txt></block></li><li guid="_52f3292e-e3d8-4bae-96dd-d6f85f8c7103" id="sec.563-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">officers and employees of, or agents of, or contractors for, agents or contractors mentioned in <intref check="valid" refid="sec.563-ssec.1-para1.c" target.guid="_3c6149d9-a1ef-4f6c-bdf3-5090e1fdd01a">paragraph (c)</intref>.</txt></block></li></list><note guid="_bcb6ebae-b6fa-4805-8a58-58ba0c913f5a" id="sec.563-ssec.1-note" type="example"><heading guid="_71fbbf12-3713-4a45-b773-f199cc77ebc3" id="sec.563-ssec.1-note-he">Example—</heading><block><txt break.before="1">A petroleum lease holder may also enter into a coordination arrangement under which another party to the arrangement may carry out an authorised activity for the lease. See <intref check="valid" refid="sec.234" target.guid="_833f730f-e87f-4f59-9210-6dce92c940d2">section 234</intref><intref check="valid" refid="sec.234-ssec.1" target.guid="_cb5ae2df-d0dc-40ca-b283-59ffa796127b">(1)</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_78f58a6e-874a-4d42-b3e6-06166acc11d9" id="sec.563-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The authority may be express, or implied from—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bcb218d9-e75c-44a3-9979-2c115d2dbf7f" id="sec.563-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the nature of the relationship between the person and the holder; or</txt></block></li><li guid="_8ef92b20-93b4-4a95-a534-d24ad8b6514a" id="sec.563-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the duties the person performs for the holder; or</txt></block></li><li guid="_4f5de5ce-1b39-4dce-8108-6c16313c5bc1" id="sec.563-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the duties a person mentioned in <intref check="valid" refid="sec.563-ssec.1" target.guid="_f3c5238c-2b43-4183-bbcc-bcd12796d5b7">subsection (1)</intref> customarily performs.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_33053f67-a856-4e64-8671-e3f6441a4f7e" id="sec.563A" provision.type="other" spent.amends="0"><no>563A</no><heading guid="_bafa2690-59af-47c0-9ead-3c8b6cb43c82" id="sec.563A-he">Limitation of owner’s or occupier’s tortious liability for authorised activities</heading><subclause affected.by.uncommenced="0" guid="_4372f329-ff37-4040-b05e-b3ce258d54e7" id="sec.563A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to an owner or occupier of land in the area of a petroleum authority if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_45c747af-8334-49a8-b3c8-dedb51a8ea3d" id="sec.563A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">someone else carries out an authorised activity for a petroleum authority on the land; or</txt></block></li><li guid="_c8364e17-b4fe-4f15-ac5a-9ad3b9555b47" id="sec.563A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">someone else carries out an activity on the land and, in doing so, purports to be carrying out an authorised activity for a petroleum authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0a5ce3c7-d7c4-4f5b-98b8-74dfee07851a" id="sec.563A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The owner or occupier is not civilly liable to anyone else for a claim based in tort for damages relating to the carrying out of the activity.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6116935a-e750-44f0-bff0-8575169dc884" id="sec.563A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.563A-ssec.2" target.guid="_0a5ce3c7-d7c4-4f5b-98b8-74dfee07851a">subsection (2)</intref> does not apply to the extent the owner or occupier, or someone else authorised by the owner or occupier, caused, or contributed to, the harm the subject of the claim.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5ef76838-ee76-4dbc-92ff-cee723b1582f" id="sec.563A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">This section applies—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_264129e6-2b17-49c8-a3a4-6bf578eb9860" id="sec.563A-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">despite any other Act or law; and</txt></block></li><li guid="_878c8b30-c98b-4643-8c7a-8ba88ca28768" id="sec.563A-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">even though this Act or the petroleum authority prevents or restricts the carrying out of the activity as an authorised activity for the authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c27f17af-ff3b-486a-942b-bfa335761de0" id="sec.563A-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.563A-ssec.2" target.guid="_0a5ce3c7-d7c4-4f5b-98b8-74dfee07851a">subsection (2)</intref>, in this section, the terms <defterm guid="_f361830f-83b8-4502-be09-e5e4a4d83821" type="mention">claim</defterm>, <defterm guid="_bae6970e-4b17-4fab-aeb6-e7aa2d417814" type="mention">damages</defterm> and <defterm guid="_cd2c55dc-4d3f-41b0-ada7-900d593e900f" type="mention">harm</defterm> have the same meaning that they have under the <legref check="valid" jurisd="QLD" target.doc.id="act-2003-016" target.version.series="3da8c74a-bece-420f-a619-0fc1148bae39" type="act"><name emphasis="yes">Civil Liability Act 2003</name></legref>.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_f4f203d8-8d45-4199-921b-ca42796d6e68" id="ch.5-pt.11"><no>Part 11</no><heading guid="_b94edf1e-059f-4a14-b8aa-6c74639a70bb" id="ch.5-pt.11-he"/><clause affected.by.uncommenced="0" guid="_d90cac7b-971d-44e9-ad27-2234203baa68" id="sec.574A" provision.type="other" spent.amends="0"><no>574A</no><heading guid="_4a076604-f8e8-4797-8a5a-5f28235653ef" id="sec.574A-he">Authority to prospect can not be surrendered</heading><block><txt break.before="1">An authority to prospect can not be surrendered.</txt></block></clause><clause affected.by.uncommenced="0" guid="_4bc19b8d-ad9a-4ce5-a0f1-47f51f7e7209" id="sec.575" provision.type="other" spent.amends="0"><no>575</no><heading guid="_f445d9ad-8bc9-4536-b63e-c501a2568946" id="sec.575-he">Requirements for surrendering another type of petroleum authority</heading><subclause affected.by.uncommenced="0" guid="_beac86ad-4d9c-461e-9092-387ff5d50719" id="sec.575-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The holder of a petroleum authority, other than an authority to prospect, may surrender all or part of the area of the authority only if, under this part—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9556229c-4029-4d98-8c92-49ba5caeebb8" id="sec.575-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an application has been made for approval of the surrender; and</txt></block></li><li guid="_38dd86b8-9205-40e4-bc5d-ce6198af543a" id="sec.575-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the surrender has been approved.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_fbfe5193-7542-4fb4-ba7d-ad2ad9bc067f" id="sec.575-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_559d0871-d85e-4a9e-87b9-cdfdef5cf0c5" id="sec.575-ssec.2-def.surrender_"><txt break.before="1"><defterm guid="_edcfc264-5555-437d-ab2b-a41b49704ee4" id="sec.575-ssec.2-def.surrender" type="definition">surrender</defterm>, for a petroleum authority, does not include a relinquishment of an area if the relinquishment is required or authorised under—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fc7d8a5b-3fe9-4cf6-ba73-935753a4a2c2" id="sec.575-ssec.2-def.surrender-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0"><intref check="valid" refid="sec.148" target.guid="_115b1a82-d8d2-4486-afff-5e835526ac37">section 148</intref>; or</txt></block></li><li guid="_b7ab7792-3ef2-4f3d-bb1b-48c0935b5e91" id="sec.575-ssec.2-def.surrender-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a relinquishment condition for the authority; or</txt></block></li><li guid="_91db2ae9-da9b-4173-805f-29b51e520be2" id="sec.575-ssec.2-def.surrender-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a relinquishment requirement under <intref check="valid" refid="sec.791" target.guid="_5e225dd2-34bd-446a-89c2-ce6d21a7530b">section 791</intref>.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_44527c92-af56-4554-9515-5361ad54a43b" id="sec.576" provision.type="other" spent.amends="0"><no>576</no><heading guid="_600951fa-5e1b-4aeb-a304-d006e04ff014" id="sec.576-he">Requirements for making surrender application</heading><subclause affected.by.uncommenced="0" guid="_9d2e4019-18b9-4409-a429-7c6061c9f933" id="sec.576-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A surrender application must be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dafe2a9d-0bab-4d6a-9135-e71f70800826" id="sec.576-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in the approved form; and</txt></block></li><li guid="_20f131c0-2491-4a7d-af93-624dcab6b166" id="sec.576-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">accompanied by the fee prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d888fbe5-a7fb-4d1d-b55c-59f92aac2a81" id="sec.576-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A surrender application must also be accompanied by a report by the applicant, containing the information prescribed under a regulation about—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_029d60bb-d0c8-41ce-90a3-b5aee7596e56" id="sec.576-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">authorised activities for the authority carried out on the area the subject of the application; and</txt></block></li><li guid="_371d4e26-73f6-4dbc-a749-3498b7f53d02" id="sec.576-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the results of the activities.</txt></block></li></list></block><penalty guid="_2bc745d9-90c3-4fcf-8513-5dbaf994792b" id="sec.576-ssec.2-pen"><block><txt break.before="1">Maximum penalty for <intref check="valid" refid="sec.576-ssec.2" target.guid="_d888fbe5-a7fb-4d1d-b55c-59f92aac2a81">subsection (2)</intref>—150 penalty units.</txt></block></penalty></subclause></clause><clause affected.by.uncommenced="0" guid="_8c924633-6eb4-479f-9e2a-b0ab23ffe19d" id="sec.577" provision.type="other" spent.amends="0"><no>577</no><heading guid="_ed3a03c9-44ab-4d2a-b4f1-5f51b6df6c6c" id="sec.577-he">Notice of application required for particular pipeline licences</heading><subclause affected.by.uncommenced="0" guid="_3ad94c3f-b71f-4ce8-8ed1-3e49348819eb" id="sec.577-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies only if the petroleum authority is a pipeline licence through which fuel gas is transported.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2673708d-86d8-4bd5-9af9-84201ff4d4be" id="sec.577-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A surrender application can not be made for the authority unless the holder has, at least 3 months before the application is lodged, lodged a notice of the holder’s intention to make the application (an <defterm guid="_92031726-0c54-4a40-aa55-b39947277a79" id="sec.577-def.applicationnotice" type="definition">application notice</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_06eeb1f4-6f56-4cd2-ad9f-f3fe76f09636" id="sec.577-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The application notice must state the reasons for the proposed surrender.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9fd0b742-bb34-40b2-8deb-c73c86066c0d" id="sec.577-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive may, after the lodging of the application notice, give the holder notice requiring the holder to give the chief executive further relevant written information by a reasonable stated day.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_839486b0-4e3f-438c-acc1-554b4e46c129" id="sec.577-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The holder must comply with the chief executive’s notice unless the holder has a reasonable excuse.</txt></block><penalty guid="_22b76c69-9e23-4ef4-8ab9-a2ce4c6e62c6" id="sec.577-ssec.5-pen"><block><txt break.before="1">Maximum penalty for <intref check="valid" refid="sec.577-ssec.5" target.guid="_839486b0-4e3f-438c-acc1-554b4e46c129">subsection (5)</intref>—500 penalty units.</txt></block></penalty></subclause></clause><clause affected.by.uncommenced="0" guid="_82a0579b-4556-4ffe-a1b4-faa24b3bfca3" id="sec.578" provision.type="other" spent.amends="0"><no>578</no><heading guid="_3a97b92e-7d94-4533-a660-97934e98b15b" id="sec.578-he">Deciding application</heading><subclause affected.by.uncommenced="0" guid="_8e5af9a5-5b72-4cea-a230-154275075cd0" id="sec.578-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may approve a surrender only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_67d56168-028e-4fee-817c-b547d0f8c87f" id="sec.578-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">up to the day the application was made, the holder had submitted all reports required to be submitted under this Act; and</txt></block></li><li guid="_6196f686-4b16-47bc-bff7-1eca88a00604" id="sec.578-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Minister considers the surrender is not against the public interest; and</txt></block></li><li guid="_c80f5d6a-b35f-4d60-b982-7963df549033" id="sec.578-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">for a surrender of all of the area of the petroleum authority—all of the relevant environmental authority has been cancelled or surrendered; and</txt></block></li><li guid="_0790e0c2-f1b2-440b-b973-e80a3d52a45e" id="sec.578-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">for a surrender of part the area of the petroleum authority—the relevant environmental authority has been amended or partially surrendered in a way that reflects the partial surrender of the petroleum authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_96e1c05c-3aa2-4962-b553-78652a694d2c" id="sec.578-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The matters that must be considered in deciding whether to approve a surrender include the extent to which the applicant has complied with the conditions of the authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_dc733a09-9e9f-443e-b4e1-32ca3e98d733" id="sec.578-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the application is for part of the area of a petroleum authority, the surrender may be approved subject to the applicant’s written agreement to the Minister amending the conditions applying to the rest of the area of the authority in a stated way that the Minister considers appropriate.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_ab70c4d0-a64c-4108-84aa-dbe64d969478" id="sec.579" provision.type="other" spent.amends="0"><no>579</no><heading guid="_29712aae-9c70-4ad8-977e-52be99ecd6d3" id="sec.579-he">Notice and taking effect of decision</heading><subclause affected.by.uncommenced="0" guid="_58293c9f-f716-4b9f-a9b4-32096ac3140c" id="sec.579-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">On approval of a surrender, the applicant must be given notice of the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_60c98114-b4b9-4a9c-a99b-87642af66fb0" id="sec.579-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A surrender takes effect on the day after the decision is made.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9d2b2214-8fac-4612-92bd-eac8b090e4fc" id="sec.579-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The applicant must be given an information notice about—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4e3f4be6-d09f-4a7a-b965-eb6931d7362b" id="sec.579-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a decision to refuse to approve a surrender; or</txt></block></li><li guid="_123695f1-8f2a-4cb0-a3ba-65f6cd1f8d9f" id="sec.579-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a decision to approve a surrender subject to the applicant’s written agreement to the Minister amending the petroleum authority in a stated way.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_098d4221-dc0d-4f73-8e4c-8f313fe94b6e" id="sec.579-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.579-ssec.3" target.guid="_9d2b2214-8fac-4612-92bd-eac8b090e4fc">subsection (3)</intref> does not apply for an amendment mentioned in <intref check="valid" refid="sec.579-ssec.3" target.guid="_9d2b2214-8fac-4612-92bd-eac8b090e4fc">subsection (3)</intref><intref check="valid" refid="sec.579-ssec.3-para1.b" target.guid="_123695f1-8f2a-4cb0-a3ba-65f6cd1f8d9f">(b)</intref> if the applicant has agreed in writing to the amendment.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_e46164aa-e05f-4102-bfc5-019e82e36aaf" id="ch.5-pt.12"><no>Part 12</no><heading guid="_823bd0c2-4458-44a8-94b3-5e61d5ead63e" id="ch.5-pt.12-he">Enforcement of end of authority and area reduction obligations</heading><clause affected.by.uncommenced="0" guid="_818e9c24-4087-4d50-9017-6d57154a9a5c" id="sec.580" provision.type="other" spent.amends="0"><no>580</no><heading guid="_654795c1-8892-4892-aa9a-f2cbc928894e" id="sec.580-he">Power of authorised person to ensure compliance</heading><subclause affected.by.uncommenced="0" guid="_51b6e9d1-790e-4fbf-8b43-179878117b0b" id="sec.580-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the holder, or former holder, of a petroleum authority has not complied with <intref check="valid" refid="sec.292" target.guid="_21940938-f87d-4dd6-9453-0c2e8fab326c">section 292</intref>, <intref check="valid" refid="sec.559" target.guid="_12ade87e-2fc7-4058-a699-e18c71c46118">559</intref> or <intref check="valid" refid="sec.560" target.guid="_8e09f8ba-7d82-4d71-9ec8-1aaa3450a8cc">560</intref> in relation to land (the <defterm guid="_d1693d61-870d-4aa9-a46a-14abd492c978" id="sec.580-def.primaryland" type="definition">primary land</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2e5f25c3-3998-4266-8168-b90ad781278b" id="sec.580-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A person authorised (the <defterm guid="_7fa10339-7418-4de1-83cb-bbf4e2bd940c" id="sec.580-def.authorisedperson" type="definition">authorised person</defterm>) by the chief executive may, by complying with <intref check="valid" refid="sec.581" target.guid="_b8853447-1d5e-4104-93d7-d1660f4e4144">section 581</intref>, exercise the following powers (<defterm guid="_9ba84dd2-bd81-4a32-a71d-13a855113402" id="sec.580-def.remedialpowers" type="definition">remedial powers</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_37e4cb25-26e1-4bb2-89c1-eb4fac767a57" id="sec.580-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">enter the primary land and do all things necessary to ensure the requirement is complied with;</txt></block></li><li guid="_7fef39a6-52f0-48ea-b73f-d272331b01f8" id="sec.580-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">enter any other land (<defterm guid="_7220e5d7-79ca-4eb2-9f77-b311e3e773b4" id="sec.580-ssec.2-def.secondaryland" type="definition">secondary land</defterm>) necessary or desirable to cross for access to the primary land.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_13b751c6-1758-47fc-bbc8-a1cbb53e48d7" id="sec.580-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, remedial powers do not include power to enter a structure, or a part of a structure, used for residential purposes without the consent of the occupier of the structure or part of the structure.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6bdbaf07-0dd5-4904-8f5e-ee821488d47a" id="sec.580-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The authorisation—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c482a540-7ab3-4f61-a01e-1a5624bd1f37" id="sec.580-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must be written; and</txt></block></li><li guid="_6fd77451-0024-49ef-aa9b-dedf78818498" id="sec.580-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">may be given on conditions the Minister considers appropriate.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b8853447-1d5e-4104-93d7-d1660f4e4144" id="sec.581" provision.type="other" spent.amends="0"><no>581</no><heading guid="_3cb8e5ce-7ae4-419f-8b47-cfaacab422a1" id="sec.581-he">Requirements for entry to ensure compliance</heading><subclause affected.by.uncommenced="0" guid="_ca728929-c821-4771-91c3-6710e338e453" id="sec.581-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Remedial powers may be exercised in relation to the primary or secondary land under <intref check="valid" refid="sec.580" target.guid="_818e9c24-4087-4d50-9017-6d57154a9a5c">section 580</intref> only if a following person is given notice of the proposed entry at least 10 business days before the proposed entry—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_13b3fc92-92d4-4e06-bf44-2c57a9173cfb" id="sec.581-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the land has an occupier—any occupier of the land;</txt></block></li><li guid="_a9f9e720-4e1c-470c-ad40-3257c0f494ab" id="sec.581-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the land does not have an occupier—its owner.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_bcb0ac23-d4e6-4f65-a269-5f4df88c0bce" id="sec.581-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f03c1891-be65-44b8-b38a-8c0a355709fd" id="sec.581-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">identify the authorised person; and</txt></block></li><li guid="_95165aec-e875-42e3-8f50-df17b908da89" id="sec.581-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">describe the land; and</txt></block></li><li guid="_e3d0d0fa-4dbd-4eaa-aa06-900d8f3bc501" id="sec.581-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5f5920f5-4997-4ceb-b2e1-73641b103502" id="sec.581-ssec.2-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">that the authorised person has, under this section, been authorised to enter the land; and</txt></block></li><li guid="_1ba147b9-daa0-4566-8ebe-b18266e658cd" id="sec.581-ssec.2-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the purpose of the entry; and</txt></block></li><li guid="_a2eaffe8-3594-467d-90e9-b05e7d648473" id="sec.581-ssec.2-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the period of the entry.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c8bf56be-7b9c-491a-b5f5-d051c7268731" id="sec.581-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive may approve the giving of the notice by publishing it in a stated way.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_07f8129b-4972-4ea1-b753-97de581c33a0" id="sec.581-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive may give the approval only if satisfied the publication is reasonably likely to adequately inform the person to whom the notice is required to be given of the proposed entry.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bd0fb216-f0aa-416e-ac46-903a831006bf" id="sec.581-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the authorised person intends to enter the land and any occupier of the land is present at the land, the person also must show, or make a reasonable attempt to show, the occupier the person’s authorisation under this section.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8ec1f329-4e5e-4deb-a82e-b4adffbb17af" id="sec.582" provision.type="other" spent.amends="0"><no>582</no><heading guid="_7f573ca2-929d-445d-b147-d36f0614fbcb" id="sec.582-he">Duty to avoid damage in exercising remedial powers</heading><block><txt break.before="1">In exercising remedial powers, a person must take all reasonable steps to ensure the person causes as little inconvenience, and does as little damage, as is practicable.</txt></block></clause><clause affected.by.uncommenced="0" guid="_daa92d2a-ea24-46c4-9faa-690bfc2834dd" id="sec.583" provision.type="other" spent.amends="0"><no>583</no><heading guid="_9af52169-fa5e-4314-bbff-08e95fc0f3e3" id="sec.583-he">Notice of damage because of exercise of remedial powers</heading><subclause affected.by.uncommenced="0" guid="_7921ccc2-7da1-4b8e-878e-5c3df9a67e03" id="sec.583-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a person exercising remedial powers damages land or something on it, the person must give the owner and any occupier of the land notice of the damage.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6d264bcd-1ffa-4319-85de-a3113cc8bff8" id="sec.583-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If for any reason it is not practicable to comply with <intref check="valid" refid="sec.583-ssec.1" target.guid="_7921ccc2-7da1-4b8e-878e-5c3df9a67e03">subsection (1)</intref>, the person must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1d76bdbf-93e8-42c7-8249-8137e0cd7ce3" id="sec.583-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">leave the notice at the place where the damage happened; and</txt></block></li><li guid="_06bf27cf-72b1-4b9c-861b-59b392acaa66" id="sec.583-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">ensure it is left in a conspicuous place and in a reasonably secure way.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_920602b6-7739-4b71-a67a-508d4a1c4088" id="sec.583-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The notice must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dd81be98-4549-4b5a-a487-9c1c29af613d" id="sec.583-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">particulars of the damage; and</txt></block></li><li guid="_41834b96-e9a7-4334-a8c8-48561092a925" id="sec.583-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that the owner or occupier may claim compensation under <intref check="valid" refid="sec.584" target.guid="_c91a66ec-c73d-4303-b9b0-018287e38afa">section 584</intref> from the State.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c91a66ec-c73d-4303-b9b0-018287e38afa" id="sec.584" provision.type="other" spent.amends="0"><no>584</no><heading guid="_fbd9a235-58cd-41b3-ab1b-23d3ba9fbb07" id="sec.584-he">Compensation for exercise of remedial powers</heading><subclause affected.by.uncommenced="0" guid="_d14e7f55-702e-4d06-8710-a5cc8480b3c8" id="sec.584-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if an owner or occupier of land (the <defterm guid="_acf0d1ea-d233-459b-8440-7bbdf33bb359" id="sec.584-def.claimant" type="definition">claimant</defterm>) suffers a cost, damage or loss because of the exercise, or purported exercise, of remedial powers.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d4610bd6-adc8-4bb1-9ed2-241541f19fab" id="sec.584-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Compensation is payable to the claimant by the State for the cost, damage or loss.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e237e419-0ed0-4a71-8199-7e19bf013d5b" id="sec.584-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The compensation may be claimed and ordered in a proceeding brought in a court of competent jurisdiction.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_cffa48e7-8cdd-4dce-8ae7-3f8564d358b4" id="sec.584-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The court may order the compensation only if it is satisfied it is just to make the order in the circumstances of the particular case.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a9b6808c-92c3-42f1-9bab-ff075590d40b" id="sec.585" provision.type="other" spent.amends="0"><no>585</no><heading guid="_aebe613b-cde8-48f0-9cef-004b0fc585fa" id="sec.585-he">Ownership of thing removed in exercise of remedial powers</heading><subclause affected.by.uncommenced="0" guid="_4dddb4d9-da4b-4958-8c48-e9e145324b8c" id="sec.585-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d62b4c62-e72e-4d82-9447-1d6caed9b1d5" id="sec.585-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">remedial powers are exercised in relation to land; and</txt></block></li><li guid="_9a9ffa99-fff7-49a3-b5e6-b893263be5bd" id="sec.585-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">in the exercise of the powers a thing is removed from the land; and</txt></block></li><li guid="_4ca684c8-4688-4118-b70e-e04f7b67fed1" id="sec.585-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">immediately before the removal, the thing was the property of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6f55dd22-c714-4b21-9293-9dd59c2736e7" id="sec.585-ssec.1-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the holder, or former holder, of a petroleum authority in relation to whom the powers were exercised; or</txt></block></li><li guid="_0a69b960-586a-4718-ae6c-4dbdccce1b14" id="sec.585-ssec.1-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">an agent of, or contractor for, the holder.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7c5ad584-b48a-46e0-9e81-46d0819862f0" id="sec.585-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On the removal, the thing becomes the property of the State.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2a2cda59-fec4-43ae-bb95-016de642d2e3" id="sec.585-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The State may deal with the thing as it considers appropriate, including, for example, by destroying it or giving it away.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0e055999-0ec7-483c-9ee1-1407a6d41cc8" id="sec.585-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive may deal with the thing for the State.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c1a4c621-b6ea-4e86-8767-b0383091194d" id="sec.585-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the State sells the thing, the State may, after deducting the costs of the sale, return the net proceeds of the sale to the former owner of the thing.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_34c24d01-07d2-4c8a-8245-e71dd021220f" id="sec.586" provision.type="other" spent.amends="0"><no>586</no><heading guid="_ea806228-9b47-4c4d-b85a-9bf5d0b7ced8" id="sec.586-he">Recovery of costs of and compensation for exercise of remedial power</heading><subclause affected.by.uncommenced="0" guid="_a4427e72-79c5-4ac9-b2dc-6c07b0b2a147" id="sec.586-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The State may recover from the responsible person as a debt any—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0f4f73f3-c55b-4710-8565-b228842f6e89" id="sec.586-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">reasonable costs the State, or an authorised person under <intref check="valid" refid="sec.580" target.guid="_818e9c24-4087-4d50-9017-6d57154a9a5c">section 580</intref>, incurs in exercising a remedial power; and</txt></block></li><li guid="_a5e8d929-c1a8-4dc8-8437-8d5c2a6ea138" id="sec.586-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">compensation payable by the State under <intref check="valid" refid="sec.584" target.guid="_c91a66ec-c73d-4303-b9b0-018287e38afa">section 584</intref> in relation to the exercise of the remedial power.</txt></block></li></list><note guid="_a77d2aad-5e5e-4b67-a4bf-21189ff5259e" id="sec.586-ssec.1-note" type="example"><heading guid="_58136fd5-549c-442c-87f9-b8743647af6b" id="sec.586-ssec.1-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.841" target.guid="_7273e0e9-2e56-4b5f-b665-e8245ca76320">section 841</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_031953d1-153b-4db9-b617-5c60a738df64" id="sec.586-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, in any proceeding to recover the costs, any relevant net proceeds of sale mentioned in <intref check="valid" refid="sec.585" target.guid="_a9b6808c-92c3-42f1-9bab-ff075590d40b">section 585</intref> must be deducted from the amount claimed for the costs.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_780ded1e-ab71-4d69-9e72-a8372467e3d4" id="sec.586-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_30620f56-063b-4dfc-bb92-e7e2cb8fe0bc" id="sec.586-ssec.3-def.relevantnetproceedsofsale_"><txt break.before="1"><defterm guid="_0aa19bd5-9947-41c3-afb0-ce96fb6aa3f4" id="sec.586-ssec.3-def.relevantnetproceedsofsale" type="definition">relevant net proceeds of sale</defterm> means proceeds of sale under which the thing sold was the property of the responsible person immediately before its removal under <intref check="valid" refid="sec.585" target.guid="_a9b6808c-92c3-42f1-9bab-ff075590d40b">section 585</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_448612b3-3ab8-4250-a339-2030c12c9996" id="sec.586-ssec.3-def.responsibleperson_"><txt break.before="1"><defterm guid="_981c88c4-a260-418b-a108-a7ee12b17fc3" id="sec.586-ssec.3-def.responsibleperson" type="definition">responsible person</defterm> means the holder, or former holder, of the petroleum authority in relation to which the remedial powers were exercised.</txt></definition></deflist></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_ca67e30f-ef6f-481d-a9cb-342fdd3a64a3" id="ch.5-pt.13"><no>Part 13</no><heading guid="_2dece0a3-3379-4bae-80ec-32bd132b33a1" id="ch.5-pt.13-he">Miscellaneous provisions</heading><clause affected.by.uncommenced="0" guid="_0406048f-93d0-4a37-90ea-4b2584932894" id="sec.587" provision.type="other" spent.amends="0"><no>587</no><heading guid="_42b31a98-cc77-48fc-a689-1a22b9fb7c5c" id="sec.587-he">Minister’s power to ensure compliance by petroleum authority holder</heading><subclause affected.by.uncommenced="0" guid="_deef1eb8-8f75-4553-81db-8ca2fa9a5487" id="sec.587-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e3238282-dc0f-4605-b020-0d2a78012aac" id="sec.587-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the holder of a petroleum authority has not complied with a requirement, under this Act, of the holder; and</txt></block></li><li guid="_ae77a685-b2d7-48b6-baa1-c10511a1bc09" id="sec.587-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">no other provision of this Act allows someone other than the holder to ensure compliance with the requirement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_50cdb382-cf01-4fd0-b182-1fb0f52742fe" id="sec.587-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister may take any action the Minister considers appropriate to ensure all or part of the requirement is complied with if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e74e0b28-9d5c-4a57-9842-3a86f748ceaf" id="sec.587-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0"><intref check="valid" refid="sec.587-ssec.3" target.guid="_2207ed33-6706-4f9a-a7ca-205f425bc41b">subsections (3)</intref> and <intref check="valid" refid="sec.587-ssec.4" target.guid="_bd39ab91-c614-4fe2-9da0-182abfb98b40">(4)</intref> have been complied with; or</txt></block></li><li guid="_45fa26f7-3004-4dcf-9d86-16b426cbeb75" id="sec.587-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder has agreed to the Minister taking the action.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2207ed33-6706-4f9a-a7ca-205f425bc41b" id="sec.587-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister must give the holder notice—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5b2e2db7-d90c-496f-80f5-08dffe2f425b" id="sec.587-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">stating the requirement and the action the Minister proposes to take; and</txt></block></li><li guid="_4a52d3f3-61e9-4b19-b845-1e08190f81f4" id="sec.587-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">inviting the holder to lodge, within a stated reasonable period, submissions about the proposed action.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_bd39ab91-c614-4fe2-9da0-182abfb98b40" id="sec.587-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Any submissions lodged by the holder within the stated period must be considered before deciding to take the action.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_31c99ec3-938b-41a1-9153-3433f61259ee" id="sec.587-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">A decision to take the action does not take effect until the holder is given an information notice about the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fc49b2f5-27a5-4239-b52f-6db9d8465257" id="sec.587-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The State may recover from the holder as a debt any reasonable costs it incurs in the exercise of the power under <intref check="valid" refid="sec.587-ssec.2" target.guid="_50cdb382-cf01-4fd0-b182-1fb0f52742fe">subsection (2)</intref>.</txt><note guid="_47315075-2024-477d-875a-d312b5b2434f" id="sec.587-ssec.6-note" type="example"><heading guid="_cf08ac85-fa1b-4ae1-969b-51d4bf1cf722" id="sec.587-ssec.6-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.841" target.guid="_7273e0e9-2e56-4b5f-b665-e8245ca76320">section 841</intref>.</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a4bc919c-7264-46d2-bbaa-0d47579c4e14" id="sec.588" provision.type="other" spent.amends="0"><no>588</no><heading guid="_b8a4d032-ecdf-4bb4-b578-c6ab252c6c41" id="sec.588-he">Interest on amounts owing to the State other than for petroleum royalty</heading><subclause affected.by.uncommenced="0" guid="_cf2dea3e-ae9b-413d-af80-846739427691" id="sec.588-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section does not apply in relation to petroleum royalty.</txt><note guid="_b36fb06c-6529-40fc-b387-0cf788bef708" id="sec.588-ssec.1-note" type="example"><heading guid="_f8fa9008-2986-4cd8-a8e1-32d2846b3fd4" id="sec.588-ssec.1-note-he">Note—</heading><block><txt break.before="1">For interest on unpaid petroleum royalty, see <intref check="valid" refid="sec.602" target.guid="_781455cf-5b8d-43c2-964e-cd50ff93c329">section 602</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_b9120681-4e69-4fad-8d06-a6607821e35c" id="sec.588-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Interest is payable to the State on any amount owing under this Act by anyone to the State and unpaid from time to time after the relevant day.</txt><note guid="_f3bc8d69-eb1a-476f-8b2b-4f76d390fe2e" id="sec.588-ssec.2-note" type="example"><heading guid="_dfc9fe30-84e9-412a-b21c-55fe6929e075" id="sec.588-ssec.2-note-he">Examples of an amount that may be owing under this Act—</heading><block><txt break.before="1">annual or other rent, a civil penalty for nonpayment of annual rent or an annual licence fee</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_18413825-e6c0-4f18-9ded-667780be1d79" id="sec.588-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The interest accrues daily at the rate prescribed under a regulation on the unpaid amount for the period starting on the day immediately after the amount became payable and ending on the day the amount owing on which interest is payable is paid in full, both days inclusive.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3be8d956-89d9-408b-bea2-338e9e75a1cf" id="sec.588-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Any amount received in payment of the unpaid amount or the interest must first be applied in payment of the interest.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ac6c5c1f-f32f-40ca-a849-27c78577fac1" id="sec.588-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0"><intref check="valid" refid="sec.588-ssec.4" target.guid="_3be8d956-89d9-408b-bea2-338e9e75a1cf">Subsection (4)</intref> applies despite any order or direction of the payer.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d1e284ed-14b0-4a6b-ae60-bb7d0aabbeb9" id="sec.588-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_f176832d-066d-4717-8090-260c00c48a2f" id="sec.588-ssec.6-def.relevantday_"><txt break.before="1"><defterm guid="_557b5bdc-6ad3-4e77-9c62-3fc300bbd076" id="sec.588-ssec.6-def.relevantday" type="definition">relevant day</defterm> means the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1395a843-e647-41ca-8cd9-4d172c53cb98" id="sec.588-ssec.6-def.relevantday-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for an amount for annual or other rent or a civil penalty for nonpayment of annual rent—the day that is 3 months after the last day for payment of the rent or civil penalty;</txt></block></li><li guid="_d8009694-c4e2-4d55-8083-42bdcd8cca0d" id="sec.588-ssec.6-def.relevantday-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for another amount—the day the amount becomes owing.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_5e5837b5-63f9-4b9b-9652-cdd7e5c904e8" id="sec.589" provision.type="other" spent.amends="0"><no>589</no><heading guid="_b98c0c51-04e4-4c98-8db2-4433b92a36ec" id="sec.589-he">Recovery of unpaid amounts</heading><subclause affected.by.uncommenced="0" guid="_bd579a55-41b3-4c89-b790-71724281aac9" id="sec.589-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a provision of this Act requires a petroleum authority holder to pay the State an amount (including interest) the State may recover the amount from the holder as a debt.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_10b32cca-a025-4a10-831d-977713284de6" id="sec.589-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_3731cdf8-82ae-4214-8538-774590426332" id="sec.589-ssec.2-def.holder_"><txt break.before="1"><defterm guid="_f6e48b38-a889-4b14-a7ec-f7dd3b12b505" id="sec.589-ssec.2-def.holder" type="definition">holder</defterm> includes a former holder of the authority in relation to which the remedial powers were exercised.</txt></definition></deflist></block></subclause></clause></part></chapter><chapter affected.by.uncommenced="0" guid="_1179c65a-355e-4281-a616-c3e83927d1e4" id="ch.6"><no>Chapter 6</no><heading guid="_2a2b1ead-46bd-410c-8007-7e7499969da3" id="ch.6-he">Petroleum royalty</heading><part affected.by.uncommenced="0" guid="_8e498945-2211-48f9-8b63-eebd004383bf" id="ch.6-pt.1"><no>Part 1</no><heading guid="_a6177ad9-17c2-4cd4-b76c-3a017b4e43a9" id="ch.6-pt.1-he">Imposition of petroleum royalty</heading><clause affected.by.uncommenced="0" guid="_ff4f91a4-c257-4867-b95d-a7d959d6317b" id="sec.590" provision.type="other" spent.amends="0"><no>590</no><heading guid="_c6194ba5-0ab9-408b-b088-f7af807b3484" id="sec.590-he">Imposition of petroleum royalty on petroleum producers</heading><subclause affected.by.uncommenced="0" guid="_954f9b58-082b-4d75-8d6b-11b0ffbcb970" id="sec.590-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A petroleum producer must pay the State petroleum royalty for petroleum that the producer produces.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c4d3b6da-a171-4df2-b81b-b2200413d65b" id="sec.590-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The petroleum royalty—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d7680ae7-4b90-4925-909f-c770adbb002b" id="sec.590-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must be paid on or before the time prescribed under a regulation; and</txt></block></li><li guid="_de5af207-761d-4df3-9881-1d4ea71c9458" id="sec.590-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is calculated in the manner prescribed by regulation; and</txt></block></li><li guid="_3143d895-8dac-4973-b497-a22a8906ee15" id="sec.590-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">is payable at the rate prescribed by regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7a33258d-f691-439d-b0cf-39711c46b457" id="sec.590-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A regulation made under <intref check="valid" refid="sec.590-ssec.2" target.guid="_c4d3b6da-a171-4df2-b81b-b2200413d65b">subsection (2)</intref> may prescribe different calculations and rates for different types of petroleum, different uses of petroleum and different periods.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_dc8d2051-df92-4293-9efe-2ade317b44e7" id="sec.590-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">This section is subject to any exemption under <intref check="valid" refid="sec.591" target.guid="_4423e0f8-e7d5-4d2e-9097-bf8440036430">section 591</intref> or <intref check="valid" refid="sec.591A" target.guid="_a98b0784-9e53-4804-877e-d788595f77b7">591A</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_4423e0f8-e7d5-4d2e-9097-bf8440036430" id="sec.591" provision.type="other" spent.amends="0"><no>591</no><heading guid="_b71f66f3-7f98-4d41-9ea9-7d134e0e5948" id="sec.591-he">General exemptions from petroleum royalty</heading><subclause affected.by.uncommenced="0" guid="_b84c44d0-f781-4e57-aeef-88c33cea8874" id="sec.591-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Petroleum produced on or after 31 December 2004 is exempt from the petroleum royalty if the Minister is satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a45e4d82-a39c-43f1-a8da-9c8531dfed65" id="sec.591-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the petroleum was unavoidably lost before it could be measured; or</txt></block></li><li guid="_eb83476c-4e14-4fc7-a3a7-c1556bd1597d" id="sec.591-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the petroleum was used—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d92ca37e-d623-4716-9a45-083e1b3b90b0" id="sec.591-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">if it was produced under a petroleum tenure or <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> petroleum tenure—in the production of petroleum from that tenure; or</txt></block></li><li guid="_8487eb07-fff5-4c2e-8842-c6d2f7aa7f6b" id="sec.591-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the petroleum is coal seam gas—by the petroleum producer for mining the coal that produced the gas; or</txt></block></li></list></block></li><li guid="_6e1100d5-4ccc-447b-b581-c246b80d838b" id="sec.591-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that, before the petroleum was produced in the State, it was produced outside the State and injected or reinjected into a natural underground reservoir in the State; or</txt></block></li><li guid="_a8053709-a47b-4410-8e4f-66347a533bff" id="sec.591-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the petroleum is petroleum on which petroleum royalty has already been paid; or</txt></block></li><li guid="_c4ccd115-5e85-4709-a02c-0f70dfceb281" id="sec.591-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the petroleum is coal seam gas on which royalty under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref> is payable; or</txt></block></li><li guid="_db3c3365-5927-420e-a7be-ea2327023f84" id="sec.591-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">the petroleum was flared or vented as part of testing for the presence of petroleum during the drilling of a well.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0ab82f5f-06e5-4793-b947-1abd789f4695" id="sec.591-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_537cb791-657f-42cd-81df-e3c429094e43" id="sec.591-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0"><intref check="valid" refid="sec.591-ssec.1" target.guid="_b84c44d0-f781-4e57-aeef-88c33cea8874">subsection (1)</intref> ceases to apply if, under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.6" target.guid="_55412cd7-ecff-4e2b-99fa-1c2290aac632">part 6</intref>, <intref check="valid" refid="ch.2-pt.6-div.3" target.guid="_fdcb9028-dc52-4ad5-9359-62ed5afd2f91">division 3</intref>, the petroleum becomes the property of the State; and</txt></block></li><li guid="_730bead9-e439-4270-8614-ccd2547c401a" id="sec.591-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0"><intref check="valid" refid="sec.591-ssec.1" target.guid="_b84c44d0-f781-4e57-aeef-88c33cea8874">subsection (1)</intref><intref check="valid" refid="sec.591-ssec.1-para1.c" target.guid="_6e1100d5-4ccc-447b-b581-c246b80d838b">(c)</intref> does not apply if, after the petroleum royalty was paid, property in the petroleum is taken to have passed to the State under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.6" target.guid="_55412cd7-ecff-4e2b-99fa-1c2290aac632">part 6</intref>, <intref check="valid" refid="ch.2-pt.6-div.3" target.guid="_fdcb9028-dc52-4ad5-9359-62ed5afd2f91">division 3</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_95d076f0-fc7d-444a-98fb-37d239576442" id="sec.591-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Despite <intref check="valid" refid="sec.591-ssec.1" target.guid="_b84c44d0-f781-4e57-aeef-88c33cea8874">subsection (1)</intref><intref check="valid" refid="sec.591-ssec.1-para1.b" target.guid="_eb83476c-4e14-4fc7-a3a7-c1556bd1597d">(b)</intref><intref check="valid" refid="sec.591-ssec.1-para1.b-para2.ii" target.guid="_8487eb07-fff5-4c2e-8842-c6d2f7aa7f6b">(ii)</intref>, if the first underground mining of coal in a mining lease commenced before 31 December 2004, petroleum produced on the mining lease and used beneficially for mining under the mining lease is exempt from petroleum royalty.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_37b6dccb-ddea-4afc-a7e7-ecfe48e8ee3d" id="sec.591-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.591-ssec.5" target.guid="_cfcb84b2-a89e-44d4-a69b-4f787a2281a4">subsection (5)</intref> applies if the petroleum mentioned in <intref check="valid" refid="sec.591-ssec.1" target.guid="_b84c44d0-f781-4e57-aeef-88c33cea8874">subsection (1)</intref><intref check="valid" refid="sec.591-ssec.1-para1.b" target.guid="_eb83476c-4e14-4fc7-a3a7-c1556bd1597d">(b)</intref><intref check="valid" refid="sec.591-ssec.1-para1.b-para2.ii" target.guid="_8487eb07-fff5-4c2e-8842-c6d2f7aa7f6b">(ii)</intref> or <intref check="valid" refid="sec.591-ssec.3" target.guid="_95d076f0-fc7d-444a-98fb-37d239576442">subsection (3)</intref> is used to generate electricity that is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a662aad3-9d00-4a68-a132-550c2bc591a4" id="sec.591-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">partly used for mining under the mining lease; and</txt></block></li><li guid="_a62c2e43-8d48-4563-8cf0-db8b06eeb6c2" id="sec.591-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">partly used for another purpose.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_cfcb84b2-a89e-44d4-a69b-4f787a2281a4" id="sec.591-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0"><intref check="valid" refid="sec.591-ssec.1" target.guid="_b84c44d0-f781-4e57-aeef-88c33cea8874">Subsection (1)</intref><intref check="valid" refid="sec.591-ssec.1-para1.b" target.guid="_eb83476c-4e14-4fc7-a3a7-c1556bd1597d">(b)</intref><intref check="valid" refid="sec.591-ssec.1-para1.b-para2.ii" target.guid="_8487eb07-fff5-4c2e-8842-c6d2f7aa7f6b">(ii)</intref> and <intref check="valid" refid="sec.591-ssec.3" target.guid="_95d076f0-fc7d-444a-98fb-37d239576442">subsection (3)</intref> apply only to the proportion of the petroleum that is equivalent to the proportion of the electricity generated from the petroleum that is used for mining under the mining lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_59a32031-9253-46da-a5f5-b2bb16750aab" id="sec.591-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_740edd55-4fa2-48fd-a29a-562a92dd917e" id="sec.591-ssec.6-def.petroleumtenure_"><txt break.before="1"><defterm guid="_62daa29f-5ff6-48f0-aaf0-10efd8a54bd5" id="sec.591-ssec.6-def.petroleumtenure" type="definition">petroleum tenure</defterm> includes a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> petroleum tenure.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a98b0784-9e53-4804-877e-d788595f77b7" id="sec.591A" provision.type="other" spent.amends="0"><no>591A</no><heading guid="_bdc01268-ac6f-407e-b25d-a33a1008f365" id="sec.591A-he">Exemption for production testing</heading><subclause affected.by.uncommenced="0" guid="_f8fe50aa-15e9-46f1-b1a5-4c3d567bd963" id="sec.591A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_034acc9a-981e-445f-847f-9037fe0bd1c4" id="sec.591A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">under <intref check="valid" refid="sec.71A" target.guid="_4d4a223e-4703-4e99-a040-ab3ece73040e">section 71A</intref> or <intref check="valid" refid="sec.150A" target.guid="_28d5e4f1-45d3-4468-a0c8-c40686dec0cf">150A</intref>, a petroleum tenure holder carries out production testing in relation to a particular petroleum well (the <defterm guid="_c3e009e9-8071-4abf-92c2-c0cd27dc69a6" id="sec.591A-ssec.1-def.relevantwell" type="definition">relevant well</defterm>); or</txt></block></li><li guid="_a3d2fb6a-0056-4f1b-87a2-ff9852573de0" id="sec.591A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">under a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> petroleum tenure, the tenure holder carries out production testing in relation to a particular petroleum well (also the <defterm guid="_87e276f0-f2db-4911-8bb6-316dcc6bc74e" id="sec.591A-ssec.1-def.relevantwell-oc.2" type="definition">relevant well</defterm>).</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1d27ff7e-5ac2-43ed-bca1-4264d032fcc1" id="sec.591A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4525d4a4-09fe-4d13-8701-6f851ca574a7" id="sec.591A-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">petroleum produced from the relevant well is coal seam gas or natural gas; and</txt></block></li><li guid="_150a6975-6957-41fa-87dd-f39d578eb8f8" id="sec.591A-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the gas is flared or vented; and</txt></block></li><li guid="_61a9a122-4043-4b99-944c-59a53b11bbed" id="sec.591A-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the gas is, within the period provided for under <intref check="valid" refid="sec.591A-ssec.3" target.guid="_721371b7-6903-4ad9-b1cd-c34f248b8f7a">subsection (3)</intref> produced as part of the production testing;</txt></block></li></list></block><block><txt break.before="1">petroleum royalty is only payable on the amount of the petroleum flared or vented during the period that is more than 3,000,000m<sup>3</sup>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_721371b7-6903-4ad9-b1cd-c34f248b8f7a" id="sec.591A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For <intref check="valid" refid="sec.591A-ssec.2" target.guid="_1d27ff7e-5ac2-43ed-bca1-4264d032fcc1">subsection (2)</intref>, the period is the shorter of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7eb8e3e6-8d52-46eb-b712-07e04edf1a1e" id="sec.591A-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the sum of all periods after 31 December 2004 for which, under <intref check="valid" refid="sec.71A" target.guid="_4d4a223e-4703-4e99-a040-ab3ece73040e">section 71A</intref> or <intref check="valid" refid="sec.150A" target.guid="_28d5e4f1-45d3-4468-a0c8-c40686dec0cf">150A</intref>, or for a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> petroleum tenure, under the tenure, the production testing from the relevant well may be carried out;</txt></block></li><li guid="_8185cdf9-3ac3-4d9e-8785-a6b0e72ed5d6" id="sec.591A-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">13 months from the later of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0c3af560-6ee3-48d1-9cae-a9d047d32ce9" id="sec.591A-ssec.3-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the start of the production testing from the relevant well;</txt></block></li><li guid="_f009722c-6ab2-44f5-a2da-28106af1b9a8" id="sec.591A-ssec.3-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the production testing had started before 31 December 2004, 31 December 2004.</txt></block></li></list></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2ce96aeb-1b9f-4455-a543-f8176e32f893" id="sec.592" provision.type="other" spent.amends="0"><no>592</no><heading guid="_05d4981e-60ce-47c1-8fae-c68fb42af344" id="sec.592-he">Minister may decide measurement if not made or royalty information not given</heading><subclause affected.by.uncommenced="0" guid="_61eeed6d-9be7-447f-81be-4ffde1aa34e0" id="sec.592-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_66c2e911-7198-4358-9bbc-58266cd9cb90" id="sec.592-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the measurement of, or information about, petroleum is required for the purpose of a royalty return; and</txt></block></li><li guid="_52c73c72-4eeb-43fc-98c3-94eb5abe4eff" id="sec.592-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the measurement has not been made or the information has not been given or lodged as required under this Act (whether or not a royalty return has been lodged);</txt></block></li></list></block><block><txt break.before="1">the Minister may decide what the required measurement or information is.</txt><note guid="_be6b4c41-bd0d-4c09-90cb-37293f3245ba" id="sec.592-ssec.1-note" type="example"><heading guid="_6eeb336d-fb01-427e-9c68-cb2489fbba8e" id="sec.592-ssec.1-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="ch.8" target.guid="_6a18d1e2-5229-45b6-aa25-5092246a8601">chapter 8</intref> (Petroleum and fuel gas measurement) and <intref check="valid" refid="sec.801" target.guid="_6acf7b1c-5dcf-471f-a0b7-d8a03ff6052a">section 801</intref> (Petroleum producer’s measurement obligations).</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_40ac5d6a-acce-4efe-b963-ac54be4652f9" id="sec.592-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The decided measurement or information is taken to be the required measurement or information.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_df84911b-01ee-48dd-8fae-6f8e7fc2b004" id="sec.592-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">On the making of the decision, the relevant petroleum producer must be given an information notice about the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_36f2a2d5-cd3b-44c3-a5ab-9acac355b43a" id="sec.592-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">To remove any doubt, it is declared that the decision does not relieve anyone of an obligation under this Act to make the measurement or give or lodge information.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_839c1c31-4ce5-4f5d-8a94-80d4918aa832" id="ch.6-pt.2"><no>Part 2</no><heading guid="_dab95955-b70e-4f52-a676-7b12ac1fabd9" id="ch.6-pt.2-he">Royalty administration</heading><division affected.by.uncommenced="0" guid="_d6e82c34-6865-402e-9578-6304a7e52036" id="ch.6-pt.2-div.1"><no>Division 1</no><heading guid="_a2ed5144-9de5-4c6f-969f-e134dd521a9e" id="ch.6-pt.2-div.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_bb630892-e7a1-4893-9908-dad90c5a0f49" id="sec.592A" provision.type="other" spent.amends="0"><no>592A</no><heading guid="_d67ec3e8-e695-4cb9-9d6e-763cd3a81315" id="sec.592A-he">Definitions for <intref check="valid" refid="ch.6-pt.2" target.guid="_839c1c31-4ce5-4f5d-8a94-80d4918aa832">pt 2</intref></heading><block><txt break.before="1">In this part—</txt><deflist><definition affected.by.uncommenced="0" guid="_ab0814db-966d-4f83-88d1-8f6e1d016e86" id="sec.592A-def.assessment_"><txt break.before="1"><defterm guid="_9971be68-7489-44b2-871b-9fa672470c60" id="sec.592A-def.assessment" type="definition">assessment</defterm> means a determination made under this part of a royalty-related amount payable by a petroleum producer for a royalty return period or annual return period, for which an assessment notice is given, and includes a reassessment.</txt></definition><definition affected.by.uncommenced="0" guid="_ec95308c-467b-4796-8181-df502012a5ba" id="sec.592A-def.assessmentnotice_"><txt break.before="1"><defterm guid="_f07a4e77-3261-4d5d-9e31-31b6991d7a89" id="sec.592A-def.assessmentnotice" type="definition">assessment notice</defterm> see <intref check="valid" refid="sec.599E" target.guid="_f3bd3ca8-fda0-4125-8cd2-73093365f846">section 599E</intref><intref check="valid" refid="sec.599E-ssec.1" target.guid="_1d5544b4-baeb-4da8-89e9-65cf01284953">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_49ac7acd-5f6f-4007-98c4-f4006e0378c8" id="sec.592A-def.defaultassessment_"><txt break.before="1"><defterm guid="_2d5c506a-401a-4c6d-bdab-04e85155a95c" id="sec.592A-def.defaultassessment" type="definition">default assessment</defterm> see <intref check="valid" refid="sec.599B" target.guid="_a99d5642-6587-43be-96be-2d35aafa7b5d">section 599B</intref><intref check="valid" refid="sec.599B-ssec.2" target.guid="_6ca37678-a517-4244-a90f-1e2a36d7500d">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_29df18ee-057b-4110-93bc-86b8277e5b9f" id="sec.592A-def.originalassessment_"><txt break.before="1"><defterm guid="_0280589a-4ad5-42ed-9b50-75cc72f95ce6" id="sec.592A-def.originalassessment" type="definition">original assessment</defterm>, for a royalty-related amount payable by a petroleum producer for a period, means the first assessment by the Minister of the royalty-related amount payable by the producer for the period.</txt></definition><definition affected.by.uncommenced="0" guid="_a4bea93d-00b8-4b55-95fa-52276fb831a6" id="sec.592A-def.reassessment_"><txt break.before="1"><defterm guid="_089aea20-232c-44b8-aeb2-f37fd7ca11f1" id="sec.592A-def.reassessment" type="definition">reassessment</defterm> means a determination made under this part of a variation of the royalty-related amount payable by a petroleum producer for a period, for which an assessment notice is given.</txt></definition><definition affected.by.uncommenced="0" guid="_fb256327-691a-4712-864a-4b07e7d1b0cf" id="sec.592A-def.royaltypenaltyamount_"><txt break.before="1"><defterm guid="_64b8df75-3918-464f-a0fb-1d7190322ebc" id="sec.592A-def.royaltypenaltyamount" type="definition">royalty penalty amount</defterm> see <intref check="valid" refid="sec.601" target.guid="_c6020f8e-d756-4c50-b19a-191a2f465545">section 601</intref><intref check="valid" refid="sec.601-ssec.1" target.guid="_09ad95d3-6977-4288-904c-49b1e5055b09">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_36c427ba-8532-47f2-a323-a487bf2c1f78" id="sec.592A-def.royaltyrelatedamount_"><txt break.before="1"><defterm guid="_b4b9cce6-88c3-4727-91b2-fc1715995fa5" id="sec.592A-def.royaltyrelatedamount" type="definition">royalty-related amount</defterm> means any of the following amounts—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c4d95575-caa2-4e75-9808-773e526e30f1" id="sec.592A-def.royaltyrelatedamount-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an amount of petroleum royalty;</txt></block></li><li guid="_79cbc116-9981-47d2-9c97-7f99944b372b" id="sec.592A-def.royaltyrelatedamount-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an amount of unpaid royalty interest;</txt></block></li><li guid="_2844ef1e-d189-4690-ae65-cd6fa094eb63" id="sec.592A-def.royaltyrelatedamount-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a royalty penalty amount;</txt></block></li><li guid="_86ae58c9-50c3-4d1f-8fa9-2b3c9a431fe0" id="sec.592A-def.royaltyrelatedamount-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">an amount of a civil penalty imposed under a regulation under <intref check="valid" refid="sec.604A" target.guid="_38b68173-fa12-44d1-beed-9b5a7e25811b">section 604A</intref>;</txt></block></li><li guid="_b21118b5-3bc0-4d15-9449-994cfddf9ca9" id="sec.592A-def.royaltyrelatedamount-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">if a prescribed fee must accompany a royalty return under <intref check="valid" refid="sec.595" target.guid="_b85adea1-dd88-4409-bd58-ba7c7e1e8dd3">section 595</intref><intref check="valid" refid="sec.595-ssec.3" target.guid="_d8d52ef1-289c-4bf7-afcc-9dcdecb41b82">(3)</intref>—the amount of the prescribed fee.</txt></block></li></list></definition></deflist></block></clause></division><division affected.by.uncommenced="0" guid="_57682b42-2ec2-4dc4-9fdc-462dbc0af742" id="ch.6-pt.2-div.2"><no>Division 2</no><heading guid="_cebbbd96-8bf5-4119-9c8f-f4889a96b748" id="ch.6-pt.2-div.2-he">Royalty returns</heading><clause affected.by.uncommenced="0" guid="_563ab11c-39e1-4428-9140-7f4891e5cf5b" id="sec.593" provision.type="other" spent.amends="0"><no>593</no><heading guid="_94993267-ea90-41ab-97f9-67c6fb2a4cbe" id="sec.593-he">Application of <intref check="valid" refid="ch.6-pt.2-div.2" target.guid="_57682b42-2ec2-4dc4-9fdc-462dbc0af742">div 2</intref></heading><subclause affected.by.uncommenced="0" guid="_f0edf0b8-8927-4976-a8eb-789f6a3e3b11" id="sec.593-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This division applies to a petroleum producer for each royalty return period in which—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7f323993-62dd-4df3-ab7d-afe5d2491fbb" id="sec.593-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the producer produces petroleum; or</txt></block></li><li guid="_73990dc4-49e5-4009-9161-2e686e041a5c" id="sec.593-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">petroleum that has, at any time, been produced by the producer is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ef75d5df-b01a-4453-a867-605204071847" id="sec.593-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">disposed of by the producer, by supplying it to anyone else, flaring or venting it or otherwise; or</txt></block></li><li guid="_766a817a-f0d1-459b-ae27-65949236e934" id="sec.593-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">stored for the producer in a natural underground reservoir.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0cb9b5bb-a6a0-4d94-9eb5-ba79c92d6d3e" id="sec.593-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">This division applies whether or not the producer is or was, under <intref check="valid" refid="ch.6-pt.1" target.guid="_8e498945-2211-48f9-8b63-eebd004383bf">part 1</intref>, required to pay petroleum royalty for the production.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1788da15-7100-4095-b36c-68b5626f86eb" id="sec.594" provision.type="other" spent.amends="0"><no>594</no><heading guid="_99c834d2-ae5a-4052-abe1-5776c8129b47" id="sec.594-he">Obligation to lodge royalty return</heading><subclause affected.by.uncommenced="0" guid="_2224bc22-2c8b-4992-9c15-29d6c8b77ace" id="sec.594-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The producer must, on or before the last business day of the month immediately following the royalty return period in which the petroleum was produced, disposed of or stored (the <defterm guid="_8682caed-e7ea-42ce-b4f6-d8af359c96e5" id="sec.594-def.ordinaryduedate" type="definition">ordinary due date</defterm>), or an earlier day required by the Minister under <intref check="valid" refid="sec.594-ssec.2" target.guid="_53d1cd72-0530-48ce-9127-9e77d309b602">subsections (2)</intref> and <intref check="valid" refid="sec.594-ssec.3" target.guid="_0c82d827-027a-48b1-a4fb-a2ff7ff700b0">(3)</intref>, lodge a written return containing the information prescribed under a regulation about the production, disposal or storage.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_53d1cd72-0530-48ce-9127-9e77d309b602" id="sec.594-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.594-ssec.3" target.guid="_0c82d827-027a-48b1-a4fb-a2ff7ff700b0">Subsection (3)</intref> applies if the Minister considers that, for the protection of the public revenue, a royalty return should be lodged on a day that is earlier than the ordinary due date.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0c82d827-027a-48b1-a4fb-a2ff7ff700b0" id="sec.594-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister may, by notice, require the producer to lodge the royalty return on a stated day that is at least 7 days after the day the Minister gives the producer the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0584c628-8027-4d32-a772-02da5b7cd4cb" id="sec.594-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A return under <intref check="valid" refid="sec.594-ssec.1" target.guid="_2224bc22-2c8b-4992-9c15-29d6c8b77ace">subsection (1)</intref> is a <defterm guid="_cb602926-3c79-471f-9745-255855b97974" id="sec.594-def.royaltyreturn" type="definition">royalty return</defterm>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_91cea939-2f9e-4ef4-b968-742c36625c21" id="sec.594-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Information prescribed under <intref check="valid" refid="sec.594-ssec.1" target.guid="_2224bc22-2c8b-4992-9c15-29d6c8b77ace">subsection (1)</intref> is the <defterm guid="_8f6d1479-9daf-4127-af17-2a687f19901e" id="sec.594-def.royaltyinformation" type="definition">royalty information</defterm>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b85adea1-dd88-4409-bd58-ba7c7e1e8dd3" id="sec.595" provision.type="other" spent.amends="0"><no>595</no><heading guid="_3e4ac771-a724-44f4-9b4a-6542b95d6cbc" id="sec.595-he">Fee for late lodgement of royalty return</heading><subclause affected.by.uncommenced="0" guid="_32fbdc18-8fa3-46fc-b604-2f93ec89f80f" id="sec.595-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if —</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6f9453ed-6ea0-43dd-bedc-d849126753e7" id="sec.595-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the producer does not lodge a royalty return for the production, disposal or storage; or</txt></block></li><li guid="_bde52f52-5242-4c5f-a8b9-6b5cba4d83d4" id="sec.595-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a purported royalty return lodged for the production, disposal or storage does not contain all of the royalty information.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_85bcacef-9203-456f-9f51-85681e866aed" id="sec.595-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The obligation under <intref check="valid" refid="sec.594" target.guid="_1788da15-7100-4095-b36c-68b5626f86eb">section 594</intref> to lodge a royalty return continues to apply until the section is complied with.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d8d52ef1-289c-4bf7-afcc-9dcdecb41b82" id="sec.595-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The prescribed fee must accompany a royalty return lodged after the day the return is required to be lodged under <intref check="valid" refid="sec.594" target.guid="_1788da15-7100-4095-b36c-68b5626f86eb">section 594</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2dee3596-a251-4f2c-9434-6a9e9417e858" id="sec.595-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The prescribed fee is payable in addition to any penalty imposed under <intref check="valid" refid="sec.594" target.guid="_1788da15-7100-4095-b36c-68b5626f86eb">section 594</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_904558fb-9a4c-4807-a891-d62c81f2345d" id="sec.595-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The Minister may remit the whole or part of the fee mentioned in <intref check="valid" refid="sec.595-ssec.3" target.guid="_d8d52ef1-289c-4bf7-afcc-9dcdecb41b82">subsection (3)</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1db0354d-fbf0-4e4d-9c43-2f3956288e6d" id="sec.599" provision.type="other" spent.amends="0"><no>599</no><heading guid="_19ba6e88-24aa-4567-a78e-b128fcbbfc82" id="sec.599-he">Annual royalty returns</heading><subclause affected.by.uncommenced="0" guid="_a9441d12-28ed-4bcd-a21f-5d0405dfd797" id="sec.599-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the producer for so long as, at any time during any annual return period, there is petroleum—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e7e93bf6-07c1-48d9-93b8-e8564343d878" id="sec.599-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that is the property of the producer; and</txt></block></li><li guid="_0c2d3826-0176-44e2-a137-6533cc3966d7" id="sec.599-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for which petroleum royalty is, or could be, payable by the producer.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0198c59c-77ba-4b09-b222-6e24db803531" id="sec.599-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The producer must lodge an annual royalty return for each annual return period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_da817fb6-329a-44d8-ba24-7badd9144cb8" id="sec.599-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Each annual royalty return must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e3f1fe40-c6da-454e-b6e2-18e140eb6f20" id="sec.599-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">state the royalty information, prescribed by regulation, for the annual return period to which the return relates; and</txt></block></li><li guid="_165ba50b-1c37-41c2-ba89-07d526011583" id="sec.599-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">be lodged within 3 months after the end of the annual return period to which the return relates (the <defterm guid="_d063a96c-4c90-4460-920b-44e740757772" id="sec.599-ssec.3-def.ordinaryduedate" type="definition">ordinary due date</defterm>), or an earlier day required by the Minister under <intref check="valid" refid="sec.599-ssec.4" target.guid="_5caddb89-2bdb-45d2-8c93-acbf54e08451">subsection (4)</intref> and <intref check="valid" refid="sec.599-ssec.5" target.guid="_a8ae33e1-4391-42af-b495-565b60bcd187">(5)</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5caddb89-2bdb-45d2-8c93-acbf54e08451" id="sec.599-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0"><intref check="valid" refid="sec.599-ssec.5" target.guid="_a8ae33e1-4391-42af-b495-565b60bcd187">Subsection (5)</intref> applies if the Minister considers that, for the protection of the public revenue, an annual royalty return should be lodged on a day that is earlier than the ordinary due date.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a8ae33e1-4391-42af-b495-565b60bcd187" id="sec.599-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The Minister may, by notice, require the producer to lodge the annual royalty return on a stated day that is at least 7 days after the day the Minister gives the producer the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c2ee7907-32d7-4ea5-814a-bf0c3ece85b6" id="sec.599-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The producer may apply, in the approved form, to the Minister to change the day on which an annual return period for the producer ends (the <defterm guid="_01fbba61-8641-49aa-861e-f23566ada2b1" id="sec.599-def.returnendday" type="definition">return end day</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b3af6caf-629c-4226-aabb-cc4ad113017a" id="sec.599-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the producer’s current annual return period ends on 30 June—to 31 December; or</txt></block></li><li guid="_8d57bf05-b2ae-4be5-8b44-b9319ee6481e" id="sec.599-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the producer’s current annual return period ends on 31 December—to 30 June.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_85230a18-ca8f-4185-8074-e2b01c7b76dd" id="sec.599-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">The application must be made on or before the end of the producer’s current annual return period mentioned in <intref check="valid" refid="sec.599-ssec.6" target.guid="_c2ee7907-32d7-4ea5-814a-bf0c3ece85b6">subsection (6)</intref>, unless the Minister approves, in writing, a later day.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c7986755-2275-4411-b694-41cd4448b1bc" id="sec.599-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">If the Minister approves the application, the producer must lodge an additional return (a <defterm guid="_5c9a0707-e5b6-496c-a03c-7bf36d89cdd0" id="sec.599-def.transitionalreturn" type="definition">transitional return</defterm>) for the period (the <defterm guid="_104398bd-dfd5-459c-95cf-8fe543740c9a" id="sec.599-def.transitionalreturnperiod" type="definition">transitional return period</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c3687208-a334-4c27-9dca-3d5cc0560a39" id="sec.599-ssec.8-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">starting on the day after the return end day of the producer’s current annual return period mentioned in <intref check="valid" refid="sec.599-ssec.6" target.guid="_c2ee7907-32d7-4ea5-814a-bf0c3ece85b6">subsection (6)</intref>; and</txt></block></li><li guid="_ff834664-1a5b-4e8a-975c-1b3f7775b59a" id="sec.599-ssec.8-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">ending on the 30 June or 31 December to first happen after the day mentioned in <intref check="valid" refid="sec.599-ssec.8-para1.a" target.guid="_c3687208-a334-4c27-9dca-3d5cc0560a39">paragraph (a)</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_cbce7cfa-d6e9-4e44-9d69-ca3a5bc48562" id="sec.599-ssec.9" provision.type="other"><no>(9)</no><block><txt break.before="0">This Act applies to a transitional return made under <intref check="valid" refid="sec.599-ssec.8" target.guid="_c7986755-2275-4411-b694-41cd4448b1bc">subsection (8)</intref> as if the return were an annual royalty return for an annual return period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7644ad2c-18f4-4519-b189-4b52a19df917" id="sec.599-ssec.10" provision.type="other"><no>(10)</no><block><txt break.before="0">If the Minister approves the application and the producer complies with <intref check="valid" refid="sec.599-ssec.8" target.guid="_c7986755-2275-4411-b694-41cd4448b1bc">subsection (8)</intref>, the producer’s <defterm guid="_a6a37a9a-4319-4164-be5a-37b4ced61679" id="sec.599-def.annualreturnperiod" type="definition">annual return period</defterm> for this section is each 12 month period first starting after the producer’s transitional return period ends.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_462ae810-64c2-4641-b7fc-16d9b2bcd2a8" id="sec.599-ssec.11" provision.type="other"><no>(11)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.599-ssec.6" target.guid="_c2ee7907-32d7-4ea5-814a-bf0c3ece85b6">subsections (6)</intref> to <intref check="valid" refid="sec.599-ssec.10" target.guid="_7644ad2c-18f4-4519-b189-4b52a19df917">(10)</intref>, a producer’s <defterm guid="_16fd33e7-ba93-4c7e-b8fe-69845fa63e84" id="sec.599-def.annualreturnperiod-oc.2" type="definition">annual return period</defterm> is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d74a4b55-b6ba-4ce1-897e-d9821d8bbc88" id="sec.599-ssec.11-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">each 12 month period ending on the following day—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2e5fce6d-d733-4309-a9c3-1b3c4ecf5497" id="sec.599-ssec.11-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">30 June or 31 December, as decided by the Minister and notified to the producer;</txt></block></li><li guid="_6dfdbacb-1c3a-48c5-b0b2-461950c1a381" id="sec.599-ssec.11-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if no day has been notified under <intref check="valid" refid="sec.599-ssec.11-para1.a-para2.i" target.guid="_2e5fce6d-d733-4309-a9c3-1b3c4ecf5497">subparagraph (i)</intref>, whichever of those days is first to happen after the later of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8dc99e6a-bba2-4684-8579-e403b83dbd1d" id="sec.599-ssec.11-para1.a-para2.ii-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">the commencement of this section;</txt></block></li><li guid="_2daf77e1-f791-4dc6-a2f4-f44fbd256969" id="sec.599-ssec.11-para1.a-para2.ii-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">the producer first produces petroleum for which petroleum royalty is, or could be, payable by the producer; and</txt></block></li></list></block></li></list></block></li><li guid="_f9886887-63cd-4558-8e81-ff5ed4cd779d" id="sec.599-ssec.11-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if, on the commencement of this section, the producer is not producing petroleum—the period from the commencement to the start of the first annual return period under <intref check="valid" refid="sec.599-ssec.11-para1.a" target.guid="_d74a4b55-b6ba-4ce1-897e-d9821d8bbc88">paragraph (a)</intref>; and</txt></block></li><li guid="_577e82a3-25b7-4ad3-b826-4b752157191f" id="sec.599-ssec.11-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if, on the commencement, the producer has property in petroleum for which petroleum royalty is, or could be, payable at any time—the 12 month period ending on the 30 June or 31 December to first happen after the commencement; and</txt></block></li><li guid="_a3127c93-71cd-47f4-a5a0-8ac81f2fdaea" id="sec.599-ssec.11-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">each following 12 month period after the annual return period that applies under <intref check="valid" refid="sec.599-ssec.11-para1.a" target.guid="_d74a4b55-b6ba-4ce1-897e-d9821d8bbc88">paragraph (a)</intref>, <intref check="valid" refid="sec.599-ssec.11-para1.b" target.guid="_f9886887-63cd-4558-8e81-ff5ed4cd779d">(b)</intref> or <intref check="valid" refid="sec.599-ssec.11-para1.c" target.guid="_577e82a3-25b7-4ad3-b826-4b752157191f">(c)</intref>.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_438bd042-09cc-4802-b84f-5bd43c536ef7" id="sec.599A" provision.type="other" spent.amends="0"><no>599A</no><heading guid="_d9619689-0e73-4e8c-8299-67d76b2e6063" id="sec.599A-he">Minister may require royalty estimate</heading><subclause affected.by.uncommenced="0" guid="_a2ca4461-cdf7-4c7c-9ad3-1f86e7355e10" id="sec.599A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may, by notice given to a petroleum producer who is liable to pay the State petroleum royalty under <intref check="valid" refid="sec.590" target.guid="_ff4f91a4-c257-4867-b95d-a7d959d6317b">section 590</intref>, require the petroleum producer to give the Minister a royalty estimate for the petroleum producer for a stated future period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_354bd028-7ef0-4229-9386-5d25ad66b5c2" id="sec.599A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The royalty estimate must be in a written document containing the information prescribed under a regulation about the estimated royalties payable by the petroleum producer for the future period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_34069119-faf5-42c2-8314-f0217baabc27" id="sec.599A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The petroleum producer must give the royalty estimate—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b16db6a8-805a-4774-8047-aba6de29acba" id="sec.599A-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in the way prescribed under a regulation; and</txt></block></li><li guid="_15dc4d2e-d5f3-42a7-8f64-44ee8f5937cb" id="sec.599A-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">no later than the day stated in the notice for giving the royalty estimate.</txt></block></li></list></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_5567724e-ccaf-422e-913b-07e4ff3755c8" id="ch.6-pt.2-div.3"><no>Division 3</no><heading guid="_8553f85e-6949-4e67-af89-bcb501a49897" id="ch.6-pt.2-div.3-he">Royalty assessments and reassessments</heading><clause affected.by.uncommenced="0" guid="_a99d5642-6587-43be-96be-2d35aafa7b5d" id="sec.599B" provision.type="other" spent.amends="0"><no>599B</no><heading guid="_92edc4d7-f434-406c-81b2-fda57b9ac625" id="sec.599B-he">Assessment of petroleum royalty</heading><subclause affected.by.uncommenced="0" guid="_43da54b2-858d-4cf4-a75b-1bd76f72be97" id="sec.599B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister must make an assessment of a royalty-related amount payable by a petroleum producer for each royalty return and annual royalty return lodged by the producer under this part, even if the amount of royalty payable by the producer is nil.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6ca37678-a517-4244-a90f-1e2a36d7500d" id="sec.599B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Also, the Minister may, at any time, make an assessment of the royalty-related amount payable by a petroleum producer for a royalty return period or annual return period (a <defterm guid="_e4ebf22e-8229-4a79-b97c-cdae8963274b" id="sec.599B-def.defaultassessment" type="definition">default assessment</defterm>), if the Minister is reasonably satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_047b4966-4d15-45dc-8aaa-b4f6c4f91700" id="sec.599B-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a royalty-related amount is payable by the producer for the period; but</txt></block></li><li guid="_7bebef59-d1fe-4db7-a347-9d01e557e14c" id="sec.599B-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the producer has not lodged a return for the period under this part.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_daf223c7-b90a-4651-9b56-4a16c9f4fff1" id="sec.599C" provision.type="other" spent.amends="0"><no>599C</no><heading guid="_93574d5b-c663-44e5-aa7a-1ca840c57758" id="sec.599C-he">Reassessment of royalty</heading><subclause affected.by.uncommenced="0" guid="_eb00cb71-1f13-488f-a5bf-84afe9488c4e" id="sec.599C-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may make a reassessment of a royalty-related amount payable by a petroleum producer for a royalty return period or annual return period if the Minister is reasonably satisfied the original assessment or an earlier reassessment made for the period was not or is no longer correct.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d5af78b7-edc5-448d-a4fe-1fbb9e41f8f1" id="sec.599C-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister must make a reassessment of a royalty-related amount payable by a petroleum producer for a royalty return period or annual return period if a provision of this or another Act applies to require the reassessment.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e33ce41c-c18d-4fb1-9b5b-116ad4cbe812" id="sec.599C-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A reassessment increasing a royalty-related amount payable by a petroleum producer for a royalty return period or annual return period may be made at any time.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_dcd1a3d4-4781-4de2-8334-e9ef4e2d19ef" id="sec.599C-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A reassessment decreasing a royalty-related amount payable by a petroleum producer for a royalty return period or annual return period must be made within 5 years after the day the original assessment for the period was made (the <defterm guid="_46cb10c2-ec08-4f6e-805a-b57825cefe92" id="sec.599C-def.reassessmentperiod" type="definition">reassessment period</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a4ea99a3-a7ac-410c-9bba-71e3adbedbbe" id="sec.599C-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">However, a reassessment decreasing a royalty-related amount payable by a petroleum producer for a royalty return period or annual return period may be made after the reassessment period if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0a370713-9765-48e6-8bcf-aa2bd09ca8d7" id="sec.599C-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">within the reassessment period, the producer asks the Minister to reassess a royalty-related amount payable by the producer for the period and the Minister agrees to make the reassessment; or</txt></block></li><li guid="_2a4ad760-163d-4fce-9b91-f156a3a9422f" id="sec.599C-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the reassessment is required under a provision of this or another Act.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8279b0c4-1fe5-4889-aa4c-6db5781e6a25" id="sec.599C-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">A reassessment does not replace the previous assessment of a royalty-related amount payable by a petroleum producer for a royalty return period or annual return period, but merely varies it by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cbe06ea5-54b0-49db-a193-2e411795a0b4" id="sec.599C-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">decreasing or increasing the royalty-related amount payable by the producer; or</txt></block></li><li guid="_d863031a-bee6-41de-8514-775e6b094952" id="sec.599C-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">changing the basis on which the royalty-related amount payable by the producer is assessed.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_077e7a4a-2c60-44ca-bb9b-c977243ef18b" id="sec.599C-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">If an assessment is made for an annual return period—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8f135c85-7e2a-4cc0-8a93-b20f6fa7c630" id="sec.599C-ssec.7-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">no further reassessments are made for royalty return periods occurring during the annual return period; and</txt></block></li><li guid="_1f09ef66-f5c8-4f65-91b2-f66d4c73a1c4" id="sec.599C-ssec.7-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any reassessment of a royalty-related amount for the period must be made by reassessment for the annual return period.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_72e6d6ee-1aaa-4c30-bdad-b7f634d08b51" id="sec.599D" provision.type="other" spent.amends="0"><no>599D</no><heading guid="_eb8d5e40-eded-4cc8-b3cf-ccdfd7177e54" id="sec.599D-he">Making assessments and default assessments in particular circumstances</heading><subclause affected.by.uncommenced="0" guid="_7fd6b5b8-d4c6-4ce0-a6b8-c403611d272a" id="sec.599D-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may make an assessment of a royalty-related amount payable by a petroleum producer for a royalty return period or annual return period on the available information the Minister considers relevant.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9aedf973-8abf-4914-b957-474f5e66855a" id="sec.599D-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.599D-ssec.3" target.guid="_ada84c3a-3f63-4b9d-9850-d70e1a7a379a">Subsection (3)</intref> applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9cc9ddb2-7577-4b95-844c-4761e8e327d1" id="sec.599D-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the Minister makes a default assessment of a royalty-related amount payable by a petroleum producer for a royalty return period or annual return period; or</txt></block></li><li guid="_e323d513-b700-47b3-ad15-ac2f0578b1d2" id="sec.599D-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the information given by a petroleum producer in a royalty return or another document relating to the return is insufficient to enable the Minister to determine a royalty-related amount payable by the producer for a royalty return period or annual return period; or</txt></block></li><li guid="_e87ae075-fce3-4ec4-8b24-4e24f6ce2ff5" id="sec.599D-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a petroleum producer fails to give the Minister information or a document required to enable the Minister to determine a royalty-related amount payable by the producer for a royalty return period or annual return period.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ada84c3a-3f63-4b9d-9850-d70e1a7a379a" id="sec.599D-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister may make an assessment for the amount the Minister reasonably believes to be the royalty-related amount payable by the producer for the period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3038a030-8d6b-4dac-afde-bb707e5c86a2" id="sec.599D-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If an assessment of a royalty-related amount payable by a petroleum producer is made under <intref check="valid" refid="sec.599D-ssec.3" target.guid="_ada84c3a-3f63-4b9d-9850-d70e1a7a379a">subsection (3)</intref> because the producer failed to give a document mentioned in <intref check="valid" refid="sec.599D-ssec.2" target.guid="_9aedf973-8abf-4914-b957-474f5e66855a">subsection (2)</intref><intref check="valid" refid="sec.599D-ssec.2-para1.c" target.guid="_e87ae075-fce3-4ec4-8b24-4e24f6ce2ff5">(c)</intref>, the Minister may make an assessment as if the document were in existence and in the Minister’s possession.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f3bd3ca8-fda0-4125-8cd2-73093365f846" id="sec.599E" provision.type="other" spent.amends="0"><no>599E</no><heading guid="_db64da8a-efd3-4b09-83f9-8ec2008b2442" id="sec.599E-he">Notice of assessment or reassessment</heading><subclause affected.by.uncommenced="0" guid="_1d5544b4-baeb-4da8-89e9-65cf01284953" id="sec.599E-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister must give notice of an assessment or reassessment of a royalty-related amount payable by a petroleum producer for a royalty return period or annual return period (an <defterm guid="_100953c6-feee-4ca0-927b-5ca400e25e51" id="sec.599E-def.assessmentnotice" type="definition">assessment notice</defterm>) to the producer.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bff7479f-0533-49cd-b5c8-732b244c71db" id="sec.599E-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the royalty-related amount already paid by the producer for the period is more than the amount assessed or reassessed as payable for the period, the assessment notice must include the amount of the difference between those amounts.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ed0a6c6a-928d-4ca8-a455-7d481b1f62d4" id="sec.599E-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0"><intref check="valid" refid="sec.599E-ssec.4" target.guid="_eae326fb-38fd-4c97-b322-824ca0574258">Subsection (4)</intref> applies if the royalty-related amount already paid by the producer for the period is less than the amount assessed or reassessed as payable for the period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_eae326fb-38fd-4c97-b322-824ca0574258" id="sec.599E-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The assessment notice must include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ce7607f5-8d71-4cfe-a09d-8cf3c654a371" id="sec.599E-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the amount of the difference between the royalty-related amount paid and the royalty-related amount payable for the period (the <defterm guid="_1baf377e-fca0-4320-95ec-e3969337f749" id="sec.599E-ssec.4-def.liabilitydifference" type="definition">liability difference</defterm>); and</txt></block></li><li guid="_1272881d-9436-44f6-b437-40c8b6dc4b3d" id="sec.599E-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the day by which the liability difference must be paid (the <defterm guid="_270edb0d-2039-48a2-ac32-4a128261f6b4" id="sec.599E-ssec.4-def.duedate" type="definition">due date</defterm>); and</txt></block></li><li guid="_1459ea30-c809-4ff4-9acb-e618daa1910b" id="sec.599E-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a statement that, under <intref check="valid" refid="sec.602" target.guid="_781455cf-5b8d-43c2-964e-cd50ff93c329">section 602</intref>, unpaid royalty interest is payable on the amount of the liability difference, to the extent it is comprised of royalty unpaid from time to time for the period—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_be9a5d4b-2287-4c6f-8a76-5bffd897cbd7" id="sec.599E-ssec.4-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">starting on, and including, the day after the lodgement day; and</txt></block></li><li guid="_d672c481-f56d-4fec-b836-ed6d891ee545" id="sec.599E-ssec.4-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">ending on, and including, the day the liability difference is paid in full; and</txt></block></li></list></block></li><li guid="_ef6231d0-a5f2-4cd0-b060-132182c70cea" id="sec.599E-ssec.4-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the rate at which the interest is payable; and</txt></block></li><li guid="_43f7666c-1311-446e-baac-30599e3fcc95" id="sec.599E-ssec.4-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the royalty penalty amount for which the producer is liable under <intref check="valid" refid="sec.601" target.guid="_c6020f8e-d756-4c50-b19a-191a2f465545">section 601</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1d693f47-d123-4bd5-a992-323d8bfb69e4" id="sec.599E-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The due date must be at least the following number of days after the day the Minister gives the notice to the producer—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0256ce88-5582-4436-b296-14c7c8b05948" id="sec.599E-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for an assessment other than a reassessment or default assessment—7 days;</txt></block></li><li guid="_7f13ce8a-900a-4be7-a027-69dec3c46130" id="sec.599E-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for a reassessment or default assessment—28 days.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d04a7c3a-4801-4b93-aab6-b2534429a94f" id="sec.599E-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_f717d52b-d771-42f7-8fc0-eba730ff2b4b" id="sec.599E-ssec.6-def.lodgementday_"><txt break.before="1"><defterm guid="_2786190f-1936-4ed7-8e7e-356a35a55eb0" id="sec.599E-ssec.6-def.lodgementday" type="definition">lodgement day</defterm>, for a royalty return period or annual return period, means the day a royalty return must be lodged by a petroleum producer for the period.</txt></definition></deflist></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_f4075892-eb23-43f7-84b2-412014492e12" id="ch.6-pt.2-div.4"><no>Division 4</no><heading guid="_a41473c5-9d99-40e6-8111-626d6944b189" id="ch.6-pt.2-div.4-he">Use of approved information system for particular decisions</heading><clause affected.by.uncommenced="0" guid="_f216fbdf-46db-4c59-b9a9-2ea3c0b40671" id="sec.599F" provision.type="other" spent.amends="0"><no>599F</no><heading guid="_53b5878e-6376-497d-b0f0-8a11f867ea50" id="sec.599F-he">Approved information system</heading><block><txt break.before="1">The Minister may approve an information system for a royalty provision.</txt></block></clause><clause affected.by.uncommenced="0" guid="_cd20590e-01df-40ec-826d-c8d12d68d4ce" id="sec.599G" provision.type="other" spent.amends="0"><no>599G</no><heading guid="_45efcfef-5246-4f74-821b-9ecada165560" id="sec.599G-he">Minister may arrange for use of an approved information system to make particular decisions</heading><subclause affected.by.uncommenced="0" guid="_840bb97d-1684-4660-a179-66a5f6658870" id="sec.599G-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may arrange for the use of an approved information system for any purposes for which the Minister may make a relevant decision under a royalty provision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a9ba0257-9319-4a90-b949-6a3be801d7c5" id="sec.599G-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A relevant decision made by the operation of an approved information system under an arrangement made under <intref check="valid" refid="sec.599G-ssec.1" target.guid="_840bb97d-1684-4660-a179-66a5f6658870">subsection (1)</intref> is taken to be a decision made by the Minister.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fa0d9b7f-f7c2-4916-ba6e-eeeec40f8a23" id="sec.599G-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_c6d2c521-26d2-4d10-86fb-442cd4871bf7" id="sec.599G-ssec.3-def.relevantdecision_"><txt break.before="1"><defterm guid="_1ecf3199-4de8-44ec-be96-f6496813d20f" id="sec.599G-ssec.3-def.relevantdecision" type="definition">relevant decision</defterm> means a decision that does not involve the exercise of the Minister’s discretion.</txt></definition></deflist></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_ad5e543c-e02a-4350-9709-42fe95dacb83" id="ch.6-pt.2-div.5"><no>Division 5</no><heading guid="_44d80be7-200f-4d9f-8547-1e0c3bd68fa1" id="ch.6-pt.2-div.5-he">Evidence</heading><clause affected.by.uncommenced="0" guid="_9dd03f54-0a0a-44b8-a41e-d38d1743f78c" id="sec.599H" provision.type="other" spent.amends="0"><no>599H </no><heading guid="_8248a59b-265b-4ff0-abe2-5e9e71e43818" id="sec.599H-he">Application of division</heading><block><txt break.before="1">This division applies to a proceeding relating to a royalty-related amount, whether the proceeding is under this Act or another law.</txt></block></clause><clause affected.by.uncommenced="0" guid="_e2643b9d-bbe3-4bbb-ae88-89675e7d9f8b" id="sec.599I" provision.type="other" spent.amends="0"><no>599I </no><heading guid="_4e9ae3cf-cc20-4a95-83fc-23e98b14d091" id="sec.599I-he">Evidentiary certificates</heading><subclause affected.by.uncommenced="0" guid="_d1fbde76-807a-49c3-aea8-e7d081ceef84" id="sec.599I-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A certificate purporting to be signed by the Minister stating any of the following matters is evidence of the matter—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_acb12f6b-0ddc-45c3-98a4-b941348b156b" id="sec.599I-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">on a stated date—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f314963a-bd41-4393-a018-c74a8405a60d" id="sec.599I-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a stated person was liable to pay, or paid, a stated amount; or</txt></block></li><li guid="_5c8da6c0-cfa4-49b9-b816-330af840d01a" id="sec.599I-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a stated notice was published in a stated way; or</txt></block></li><li guid="_6c829799-deea-42c3-b5fb-2f682bcedc7c" id="sec.599I-ssec.1-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">a stated person made, gave or executed a stated document; or</txt></block></li><li guid="_847bb4fb-280f-4986-a3c8-526ca8893515" id="sec.599I-ssec.1-para1.a-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">an assessment or determination was made; or</txt></block></li><li guid="_c1de3b3b-9676-451d-a8e4-71c4f8366f45" id="sec.599I-ssec.1-para1.a-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">a stated document was given to a stated person in a stated way; or</txt></block></li><li guid="_cf46a527-eab7-4d2d-85d0-81f135592a64" id="sec.599I-ssec.1-para1.a-para2.vi" provision.type="other"><no>(vi)</no><block><txt break.before="0">a stated document or information was not received by a stated person; or</txt></block></li><li guid="_94d00e05-e8fa-403d-9e9e-5f8f51e41152" id="sec.599I-ssec.1-para1.a-para2.vii" provision.type="other"><no>(vii)</no><block><txt break.before="0">a stated person had or had not done a stated thing required to be done under this Act;</txt></block></li></list></block></li><li guid="_e6a6c1cd-ac9d-4ede-823b-925cd383589c" id="sec.599I-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the details of an assessment or determination;</txt></block></li><li guid="_153d4deb-3a4d-4d3d-b774-e99e3fd634ac" id="sec.599I-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a stated person is authorised to conduct a stated proceeding for the Minister;</txt></block></li><li guid="_c84dba6c-594d-470e-b4e3-fc4aeda3ce96" id="sec.599I-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a stated document is a copy of, or part of, another document.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_61b3e653-304a-41d4-8cc6-8a7cc14fb21c" id="sec.599I-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_0191101b-d287-44df-9ef1-2b8066115ba8" id="sec.599I-ssec.2-def.determination_"><txt break.before="1"><defterm guid="_78f89a0e-4c2a-4ed8-94f6-f3ce66c5dc71" id="sec.599I-ssec.2-def.determination" type="definition">determination</defterm> has the meaning given under this Act as in force before 1 July 2014.</txt></definition></deflist></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_7e6ed5a1-eb31-4305-81b7-e57f6d10d2b8" id="ch.6-pt.2-div.6"><no>Division 6</no><heading guid="_8ff67633-fb37-4f9f-80eb-90bc1166d59a" id="ch.6-pt.2-div.6-he">Giving documents</heading><clause affected.by.uncommenced="0" guid="_7b6cbd82-0716-4ccc-bb9b-194512c03f96" id="sec.599J" provision.type="other" spent.amends="0"><no>599J</no><heading guid="_0b0acbd0-652f-4832-9294-55e302aa5ae8" id="sec.599J-he">Application of division</heading><block><txt break.before="1">This division applies if a royalty provision requires or permits a document to be given to a person, whether the expression ‘give’, ‘lodge’, ‘notify’, ‘apply’ or ‘advise’ or another expression having a similar meaning is used.</txt></block></clause><clause affected.by.uncommenced="0" guid="_7b9915b8-b482-4d48-af2a-0031e0ccd299" id="sec.599K" provision.type="other" spent.amends="0"><no>599K</no><heading guid="_2056c272-ffb6-45f2-9aec-e51272697a5d" id="sec.599K-he">Ways of giving documents to Minister</heading><block><txt break.before="1">A document is taken to be given to the Minister under a royalty provision if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fd8e189d-2611-43dc-959a-5ed1567e836e" id="sec.599K-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">it is left at the office of the department with a public service employee engaged in the administration of the royalty provisions; or</txt></block></li><li guid="_49e603e8-d19b-41a3-b1a5-8185f0d792f4" id="sec.599K-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">it is sent by post or facsimile to the office of the department; or</txt></block></li><li guid="_228c3d27-6bcf-49da-85a9-67a285edb2af" id="sec.599K-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">it is given under the <legref check="valid" jurisd="QLD" target.doc.id="act-2001-042" target.version.series="a717eb06-9e0c-4113-ba1a-0aea28258996" type="act"><name emphasis="yes">Electronic Transactions (Queensland) Act 2001</name></legref> to a public service employee engaged in the administration of the royalty provisions, including by using an approved information system; or</txt></block></li><li guid="_784875dc-9773-4186-a3b1-64f57f8a7c5a" id="sec.599K-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">it is given in a way prescribed by regulation. </txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_5c8b9c21-28c9-4c8b-bd8b-83dcb82fff19" id="sec.599L" provision.type="other" spent.amends="0"><no>599L</no><heading guid="_406b0dec-4d98-4bc3-8e7c-eafbca969dd6" id="sec.599L-he">When document given to Minister</heading><subclause affected.by.uncommenced="0" guid="_6234d641-bd71-48cf-b690-0d981697cc48" id="sec.599L-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A document is taken to be given to the Minister under a royalty provision—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e9c2ba43-63a2-4245-8571-bbcc69323be9" id="sec.599L-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if it is given in the way mentioned in <intref check="valid" refid="sec.599K" target.guid="_7b9915b8-b482-4d48-af2a-0031e0ccd299">section 599K</intref><intref check="valid" refid="sec.599K-para1.a" target.guid="_fd8e189d-2611-43dc-959a-5ed1567e836e">(a)</intref>—when it is actually received by the public service employee with whom it is left; or</txt></block></li><li guid="_9b2af071-418c-4b39-9b38-39bc9c1f3c54" id="sec.599L-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if it is sent by facsimile—on the day the facsimile is sent; or</txt></block></li><li guid="_0895921d-b2c0-4bd7-b778-d4cb9d260f8a" id="sec.599L-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if it is given under the <legref check="valid" jurisd="QLD" target.doc.id="act-2001-042" target.version.series="a717eb06-9e0c-4113-ba1a-0aea28258996" type="act"><name emphasis="yes">Electronic Transactions (Queensland) Act 2001</name></legref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d3591d98-ec79-4287-8173-e53157cf61c1" id="sec.599L-ssec.1-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">using an approved information system—at the time the communication enters the approved information system; or</txt></block></li><li guid="_135a5015-fa76-4fae-b659-2b880b640bec" id="sec.599L-ssec.1-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">otherwise—at the time of receipt under that Act; or</txt></block></li></list></block></li><li guid="_4bd1d70d-77fb-4a63-a686-40fdfb1ed4d3" id="sec.599L-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">if it is given in the way mentioned in <intref check="valid" refid="sec.599K" target.guid="_7b9915b8-b482-4d48-af2a-0031e0ccd299">section 599K</intref><intref check="valid" refid="sec.599K-para1.d" target.guid="_784875dc-9773-4186-a3b1-64f57f8a7c5a">(d)</intref>—at the time prescribed by regulation.</txt></block></li></list></block><note guid="_163905af-1412-44ed-8e00-cd824ee00a0b" id="sec.599L-ssec.1-note" type="example"><heading guid="_772503f9-3315-4763-a26f-287afb914540" id="sec.599L-ssec.1-note-he">Note—</heading><block><txt break.before="1">For the time of giving a document by post, see the <legref check="valid" jurisd="QLD" target.doc.id="act-1954-003" target.version.series="3cfb010e-ce09-4afd-baf6-bd10d22741a7" type="act"><name emphasis="yes">Acts Interpretation Act 1954</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.39A" target.doc.id="act-1954-003" target.guid="_64c75ad3-5756-408a-abb5-48fbcaee688e" target.version.series="3cfb010e-ce09-4afd-baf6-bd10d22741a7" type="act">section 39A</legref><legref check="valid" jurisd="QLD" refid="sec.39A-ssec.1" target.doc.id="act-1954-003" target.guid="_f732f33c-5215-43bb-987e-4129a2781eb7" target.version.series="3cfb010e-ce09-4afd-baf6-bd10d22741a7" type="act">(1)</legref><legref check="valid" jurisd="QLD" refid="sec.39A-ssec.1-para1.b" target.doc.id="act-1954-003" target.guid="_8c51fcc8-60b3-488c-957d-b2397cd315e2" target.version.series="3cfb010e-ce09-4afd-baf6-bd10d22741a7" type="act">(b)</legref>.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_13fb4d07-695b-4c5e-a828-a6b9fcb053ba" id="sec.599L-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if under <intref check="valid" refid="sec.599L-ssec.1" target.guid="_6234d641-bd71-48cf-b690-0d981697cc48">subsection (1)</intref> the document is given on a day that is not a business day, or after 5p.m. on a business day, the document is taken to be given to the Minister on the following business day.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_323af512-08cd-4a09-adde-7d82a8e30ffb" id="sec.599L-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0"><intref check="valid" refid="sec.599L-ssec.2" target.guid="_13fb4d07-695b-4c5e-a828-a6b9fcb053ba">Subsection (2)</intref> does not apply to a document given to the Minister using an approved information system.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a6b69e27-0980-4465-8163-9f6afb291e0d" id="sec.599M" provision.type="other" spent.amends="0"><no>599M</no><heading guid="_8d671ef4-d195-46d1-93b9-5041646b6a94" id="sec.599M-he">When lodgement requirement complied with</heading><subclause affected.by.uncommenced="0" guid="_da890bf8-4197-493a-817c-20ec88637813" id="sec.599M-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A lodgement requirement is complied with only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e3365e47-e442-466d-8714-9d29b2e3f1b4" id="sec.599M-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">all documents required to be given under the requirement have been given by the date for complying with the requirement; and</txt></block></li><li guid="_17263ae8-403d-41f7-b1e8-78ab2d78b24a" id="sec.599M-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for a document that must be given in an approved form under the requirement—the form contains enough information for the purpose for which it is given.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_cf68c058-0b3a-4577-b414-64d0a425ac2e" id="sec.599M-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_9c047a92-bb21-4c79-85d5-31cb8815de2b" id="sec.599M-ssec.2-def.lodgementrequirement_"><txt break.before="1"><defterm guid="_a92f4b8f-6f46-4b59-892d-bb502cf3859c" id="sec.599M-ssec.2-def.lodgementrequirement" type="definition">lodgement requirement</defterm> see <intref check="valid" refid="sec.605" target.guid="_1995a4d0-b996-44ba-beeb-2ac1ae20e2dd">section 605</intref><intref check="valid" refid="sec.605-ssec.2" target.guid="_a68887af-6bf7-412d-8278-380f7d08a829">(2)</intref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8d9b64a3-c507-44eb-95bc-6cec88e09415" id="sec.599N" provision.type="other" spent.amends="0"><no>599N</no><heading guid="_983336ce-61df-4a0d-8878-b262fb022549" id="sec.599N-he">Documents may be given to agents of royalty payers</heading><subclause affected.by.uncommenced="0" guid="_02061d30-d2e3-41ed-9656-0df78d9f9457" id="sec.599N-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A document is taken to be given by the Minister to a royalty payer if it is given to an agent of the royalty payer with apparent authority to be given the document. </txt></block></subclause><subclause affected.by.uncommenced="0" guid="_72c68d04-174d-45bb-ab15-ece71be70ca6" id="sec.599N-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_76b6d10e-e7a8-4116-86e8-55683dfaf6e1" id="sec.599N-ssec.2-def.royaltypayer_"><txt break.before="1"><defterm guid="_3af8bea1-ff36-4ccb-ac96-7ca80396ce5a" id="sec.599N-ssec.2-def.royaltypayer" type="definition">royalty payer</defterm> means a person required to pay royalty under <intref check="valid" refid="sec.590" target.guid="_ff4f91a4-c257-4867-b95d-a7d959d6317b">section 590</intref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_44293997-3add-451f-9b41-8ebc57484eca" id="sec.599O" provision.type="other" spent.amends="0"><no>599O</no><heading guid="_086ad2c2-dc2a-43cd-9b44-c2b41502dab2" id="sec.599O-he">Giving document if more than 1 person liable</heading><subclause affected.by.uncommenced="0" guid="_39d1269d-6bde-453f-89ff-d0afe2b9cf9d" id="sec.599O-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A document is taken to be given by the Minister to all persons who are liable to pay a royalty-related amount for a royalty return period or annual return period if it is given to 1 person who is liable to pay the amount.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d8fc964d-1dd0-4918-9570-0a5988b9b587" id="sec.599O-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, a regulation may declare that <intref check="valid" refid="sec.599O-ssec.1" target.guid="_39d1269d-6bde-453f-89ff-d0afe2b9cf9d">subsection (1)</intref> does not apply to a person in stated circumstances.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_acd1755b-4008-44dd-91ae-7ddc58480a4d" id="sec.599O-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A regulation may be made under <intref check="valid" refid="sec.599O-ssec.2" target.guid="_d8fc964d-1dd0-4918-9570-0a5988b9b587">subsection (2)</intref> only if it is not reasonable or practicable for the document to be taken to be given to a person.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_37d4a4ae-bff0-4cd6-8d6b-a6ba3f0fba27" id="sec.599O-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0"><intref check="valid" refid="sec.599O-ssec.2" target.guid="_d8fc964d-1dd0-4918-9570-0a5988b9b587">Subsections (2)</intref> and <intref check="valid" refid="sec.599O-ssec.3" target.guid="_acd1755b-4008-44dd-91ae-7ddc58480a4d">(3)</intref> do not prevent the Minister from giving the document to the person to whom the regulation applies.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8a4c66fe-b5c5-46b6-9e4a-bac2ef2c78f4" id="sec.599P" provision.type="other" spent.amends="0"><no>599P</no><heading guid="_600431d6-ff42-4d91-9afa-f885fb50d201" id="sec.599P-he">Ways document given by Minister</heading><subclause affected.by.uncommenced="0" guid="_21e4c263-7325-4581-b097-8bdb8ddf5e9c" id="sec.599P-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A document given by the Minister to a person under a royalty provision is properly given if it is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bfc1c22d-4204-483e-a949-3f35eeb2d01f" id="sec.599P-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">given under the <legref check="valid" jurisd="QLD" target.doc.id="act-1954-003" target.version.series="3cfb010e-ce09-4afd-baf6-bd10d22741a7" type="act"><name emphasis="yes">Acts Interpretation Act 1954</name></legref>, <legref check="valid" jurisd="QLD" refid="pt.10" target.doc.id="act-1954-003" target.guid="_469ad4d4-e5b0-4b20-a41a-d42d765b6f59" target.version.series="3cfb010e-ce09-4afd-baf6-bd10d22741a7" type="act">part 10</legref>; or</txt></block></li><li guid="_a0ce23fe-022a-47bb-b1fb-14a834e5cec1" id="sec.599P-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">sent by email to the person’s email address as given by the person to a public service employee engaged in the administration of the royalty provisions; or</txt></block></li><li guid="_c0daa065-e414-4339-acda-d878d4744c1d" id="sec.599P-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">made available to the person using an approved information system in the circumstances prescribed by regulation; or</txt></block></li><li guid="_828c5ad2-6939-4ddc-b685-4bdece03c985" id="sec.599P-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">given in another way prescribed by regulation. </txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e0d6aa33-707c-4c7c-be8a-d4e6ec870460" id="sec.599P-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.599P-ssec.1" target.guid="_21e4c263-7325-4581-b097-8bdb8ddf5e9c">subsection (1)</intref><intref check="valid" refid="sec.599P-ssec.1-para1.a" target.guid="_bfc1c22d-4204-483e-a949-3f35eeb2d01f">(a)</intref>, the document is properly given under that subsection by leaving it at or sending it to an address, whether the Minister leaves it at or sends it to the address for the person recorded in the register, or another address for the person.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_919161ac-b535-4bd5-a3ad-c0aeeb88c7ef" id="sec.599Q" provision.type="other" spent.amends="0"><no>599Q</no><heading guid="_ed30a726-c76f-4379-9070-1e5b7593b9d5" id="sec.599Q-he">When document given by Minister</heading><subclause affected.by.uncommenced="0" guid="_600d7d11-57e9-4906-a544-7f5b0fc9a2bf" id="sec.599Q-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A document is taken to be given by the Minister to a person—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4c4e2f26-842e-41dc-8755-e285dceb4071" id="sec.599Q-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if it is sent by facsimile—on the day the facsimile is sent; or</txt></block></li><li guid="_63de2cb5-9738-4990-a941-c4b9d8d2edbf" id="sec.599Q-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if it is sent by email—on the day the email is sent; or</txt></block></li><li guid="_cc728830-017d-4594-ab1d-3b4c6147b66c" id="sec.599Q-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if it is made available using an approved information system or given in a way prescribed by regulation—on the day prescribed. </txt></block></li></list><note guid="_1550cf33-bbb2-4c66-8124-83cd40bc7c43" id="sec.599Q-ssec.1-note" type="example"><heading guid="_52786bc6-8499-4956-9b63-85679b5c94f8" id="sec.599Q-ssec.1-note-he">Note—</heading><block><txt break.before="1">For the time of giving a document by post, see the <legref check="valid" jurisd="QLD" target.doc.id="act-1954-003" target.version.series="3cfb010e-ce09-4afd-baf6-bd10d22741a7" type="act"><name emphasis="yes">Acts Interpretation Act 1954</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.39A" target.doc.id="act-1954-003" target.guid="_64c75ad3-5756-408a-abb5-48fbcaee688e" target.version.series="3cfb010e-ce09-4afd-baf6-bd10d22741a7" type="act">section 39A</legref><legref check="valid" jurisd="QLD" refid="sec.39A-ssec.1" target.doc.id="act-1954-003" target.guid="_f732f33c-5215-43bb-987e-4129a2781eb7" target.version.series="3cfb010e-ce09-4afd-baf6-bd10d22741a7" type="act">(1)</legref><legref check="valid" jurisd="QLD" refid="sec.39A-ssec.1-para1.b" target.doc.id="act-1954-003" target.guid="_8c51fcc8-60b3-488c-957d-b2397cd315e2" target.version.series="3cfb010e-ce09-4afd-baf6-bd10d22741a7" type="act">(b)</legref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_dce6bf4a-2058-47a9-ab70-9dc7243281b3" id="sec.599Q-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if under <intref check="valid" refid="sec.599Q-ssec.1" target.guid="_600d7d11-57e9-4906-a544-7f5b0fc9a2bf">subsection (1)</intref>, the document is given after 5p.m. on a particular day, the document is taken to be given to the person on the following business day.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_043c7be5-9f1a-4efb-93f0-334493cf7967" id="ch.6-pt.3"><no>Part 3</no><heading guid="_0e9dd028-dc9f-4efb-9082-f0f8865a846b" id="ch.6-pt.3-he">Payment of petroleum royalty</heading><division affected.by.uncommenced="0" guid="_1ca680bd-27e5-4b26-baef-9032fe646311" id="ch.6-pt.3-div.1"><no>Division 1</no><heading guid="_5214c993-7fe9-424e-b50c-a96dbd978468" id="ch.6-pt.3-div.1-he">General</heading><clause affected.by.uncommenced="0" guid="_957723b3-1536-4e9f-8b13-07ffc0bff2a7" id="sec.600" provision.type="other" spent.amends="0"><no>600</no><heading guid="_4ff744c5-7b02-48e0-96b6-c3c1fbdbb65a" id="sec.600-he">Refunds</heading><subclause affected.by.uncommenced="0" guid="_4ce3a8ab-3bf4-4920-9aab-7c1d9d1885c5" id="sec.600-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_911fbd19-a676-4046-8a86-287442e3f96c" id="sec.600-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if, on an assessment of a royalty-related amount payable by a petroleum producer for a royalty return period or annual return period made under <intref check="valid" refid="sec.599B" target.guid="_a99d5642-6587-43be-96be-2d35aafa7b5d">section 599B</intref>, the royalty-related amount paid for the period is more than the royalty-related amount payable by the producer for the period under the assessment (the difference being an <defterm guid="_d746ec4c-acc9-4bce-acf2-90a041b3e51e" id="sec.600-ssec.1-def.excessamount" type="definition">excess amount</defterm>); or</txt></block></li><li guid="_77dc735a-fb7d-4a2c-8f38-30835400c4ed" id="sec.600-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if, on a reassessment of a royalty-related amount payable by a petroleum producer for a royalty return period or annual return period made under <intref check="valid" refid="sec.599C" target.guid="_daf223c7-b90a-4651-9b56-4a16c9f4fff1">section 599C</intref>, the royalty-related amount paid for the period is more than the royalty-related amount payable by the producer for the period under the reassessment (the difference also being an <defterm guid="_24be040f-846c-4c3d-b5bd-389b2aaf3a33" id="sec.600-ssec.1-def.excessamount-oc.2" type="definition">excess amount</defterm>); or</txt></block></li><li guid="_a2cede74-5793-4e9f-a8a8-b0e4e56de55c" id="sec.600-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5fc30b00-2cf2-49bc-9e32-6ed6d9c39165" id="sec.600-ssec.1-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a royalty-related amount paid by a petroleum producer for a royalty return period or annual return period is otherwise more than the royalty-related amount payable by the producer under this chapter (the difference also being an <defterm guid="_3207e7a8-1fa6-4a79-bb45-13f9a4adc19c" id="sec.600-ssec.1-para1.c-def.excessamount" type="definition">excess amount</defterm>); and</txt></block></li><li guid="_552af905-77db-4d72-847c-fc06085f3fb8" id="sec.600-ssec.1-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the Minister has given the producer a notice stating the excess amount.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b1a04ed1-ac62-454f-99d1-28fd44f68b53" id="sec.600-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister must refund an excess amount mentioned in <intref check="valid" refid="sec.600-ssec.1" target.guid="_4ce3a8ab-3bf4-4920-9aab-7c1d9d1885c5">subsection (1)</intref> by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_021c2728-c5de-4a5f-b508-2e1fb52e73b0" id="sec.600-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">repaying the excess amount to the producer; or</txt></block></li><li guid="_cdcde52a-c0a7-4f5e-98da-3a8bfd7eb6ac" id="sec.600-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">crediting the excess amount against an amount the Minister is reasonably satisfied is, or will be, payable by the producer for a royalty-related amount.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1ba8aca5-a77d-4d5d-abe7-49c2562cce6e" id="sec.600-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">No interest is payable on the excess amount refunded.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c6020f8e-d756-4c50-b19a-191a2f465545" id="sec.601" provision.type="other" spent.amends="0"><no>601</no><heading guid="_52cd23db-a153-4916-8866-384c7109ab07" id="sec.601-he">Liability for royalty penalty amount</heading><subclause affected.by.uncommenced="0" guid="_09ad95d3-6977-4288-904c-49b1e5055b09" id="sec.601-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A petroleum producer is liable to the State for an amount (<defterm guid="_9f143aab-5c8e-4ab8-81a3-ab38a0b3d59a" id="sec.601-def.royaltypenaltyamount" type="definition">royalty penalty amount</defterm>) if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d4563ce4-8801-4cee-8a2e-b0751de3fad7" id="sec.601-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the Minister makes a default assessment under <intref check="valid" refid="sec.599B" target.guid="_a99d5642-6587-43be-96be-2d35aafa7b5d">section 599B</intref><intref check="valid" refid="sec.599B-ssec.2" target.guid="_6ca37678-a517-4244-a90f-1e2a36d7500d">(2)</intref>; or</txt></block></li><li guid="_e9e7c13e-ff75-41b9-a022-af3db1490898" id="sec.601-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Minister makes a reassessment and the original assessment was a default assessment under <intref check="valid" refid="sec.599B" target.guid="_a99d5642-6587-43be-96be-2d35aafa7b5d">section 599B</intref><intref check="valid" refid="sec.599B-ssec.2" target.guid="_6ca37678-a517-4244-a90f-1e2a36d7500d">(2)</intref>; or</txt></block></li><li guid="_8fd84da6-a540-407a-b50f-d752a1e373a2" id="sec.601-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the petroleum royalty payable by the producer for a royalty return period or annual return period on a reassessment under <intref check="valid" refid="sec.599C" target.guid="_daf223c7-b90a-4651-9b56-4a16c9f4fff1">section 599C</intref> is more than the petroleum royalty assessed as payable by the producer on the original assessment or an earlier reassessment for the period.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_147dcb7e-db10-4c15-96cb-f9e3e95c0697" id="sec.601-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The royalty penalty amount must be assessed as follows—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_71068f2c-f201-4cd3-b639-f89d50a72e64" id="sec.601-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if <intref check="valid" refid="sec.601-ssec.1" target.guid="_09ad95d3-6977-4288-904c-49b1e5055b09">subsection (1)</intref><intref check="valid" refid="sec.601-ssec.1-para1.a" target.guid="_d4563ce4-8801-4cee-8a2e-b0751de3fad7">(a)</intref> applies—an amount equal to 75% of the petroleum royalty payable;</txt></block></li><li guid="_0d76f690-f67c-471f-86a2-d68278419ee1" id="sec.601-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if <intref check="valid" refid="sec.601-ssec.1" target.guid="_09ad95d3-6977-4288-904c-49b1e5055b09">subsection (1)</intref><intref check="valid" refid="sec.601-ssec.1-para1.b" target.guid="_e9e7c13e-ff75-41b9-a022-af3db1490898">(b)</intref> applies—an amount equal to 75% of the petroleum royalty payable under the reassessment;</txt></block></li><li guid="_665d8dad-6d88-441d-b6ec-fd0b0fa1166a" id="sec.601-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if <intref check="valid" refid="sec.601-ssec.1" target.guid="_09ad95d3-6977-4288-904c-49b1e5055b09">subsection (1)</intref><intref check="valid" refid="sec.601-ssec.1-para1.c" target.guid="_8fd84da6-a540-407a-b50f-d752a1e373a2">(c)</intref> applies and the petroleum royalty payable on the reassessment is more than the royalty assessed on the original assessment—an amount equal to 75% of the difference between the 2 amounts;</txt></block></li><li guid="_6a6d4254-d92f-40c5-be9f-c8b7b5190157" id="sec.601-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">if the petroleum royalty payable on the reassessment is less than the petroleum royalty assessed on the original assessment but more than the petroleum royalty assessed on an earlier reassessment—an amount equal to 75% of the difference between the petroleum royalty payable on the last reassessment and the lowest petroleum royalty assessed on an earlier reassessment.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7079e24e-ebbb-43fa-8195-562811a0a271" id="sec.601-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister may increase the royalty penalty amount by not more than 20% of the royalty penalty amount assessed under <intref check="valid" refid="sec.601-ssec.2" target.guid="_147dcb7e-db10-4c15-96cb-f9e3e95c0697">subsection (2)</intref> if the Minister is reasonably satisfied the producer has hindered or prevented the Minister from becoming aware of the nature and extent of the producer’s liability to pay petroleum royalty.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_34d96d8e-731e-4bb2-a35b-56722838b1b5" id="sec.601A" provision.type="other" spent.amends="0"><no>601A</no><heading guid="_40afd01f-a3d2-40d1-b130-d745aa12728a" id="sec.601A-he">Royalty penalty amount not payable if proceeding for offence started</heading><subclause affected.by.uncommenced="0" guid="_7dbc67d7-b52f-488f-9fe2-6f32a9db5fc5" id="sec.601A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a petroleum producer is liable to pay all or part of a royalty penalty amount because of a particular act or omission of the producer.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_17e8bee9-d482-4233-b549-86477e322b4e" id="sec.601A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If a proceeding is started against the producer for an offence under this Act that is constituted by the particular act or omission and the royalty penalty amount has not been paid, the royalty penalty amount is payable only if the Minister withdraws the proceeding.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0c4c9831-581e-487d-b764-9f1aea5ef143" id="sec.601A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If a proceeding is started against the producer for an offence under this Act that is constituted by the particular act or omission and the royalty penalty amount has been paid, the Minister must make a reassessment remitting the royalty penalty amount to nil.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ed38f3b5-e1b2-4a1f-a1a2-070f5bc6baff" id="sec.601A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, if the proceeding against the producer is withdrawn, the Minister must make a reassessment to reinstate the royalty penalty amount remitted under <intref check="valid" refid="sec.601A-ssec.3" target.guid="_0c4c9831-581e-487d-b764-9f1aea5ef143">subsection (3)</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_916fbfc4-b56e-4b38-a75d-972ae5ae75fb" id="sec.601B" provision.type="other" spent.amends="0"><no>601B</no><heading guid="_ec5eba2e-c485-4ca2-9f68-7ef16c16175d" id="sec.601B-he">Remission of royalty penalty amount</heading><block><txt break.before="1">The Minister may remit the whole or part of a royalty penalty amount.</txt></block></clause><clause affected.by.uncommenced="0" guid="_781455cf-5b8d-43c2-964e-cd50ff93c329" id="sec.602" provision.type="other" spent.amends="0"><no>602</no><heading guid="_3c75eb13-7491-4346-9a08-ba0d9f88f298" id="sec.602-he">Unpaid royalty interest</heading><subclause affected.by.uncommenced="0" guid="_29b2fc10-7275-4703-8ffb-f6128dd63c68" id="sec.602-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, despite a petroleum producer being required under this Act to pay petroleum royalty, all or part of the royalty (the <defterm guid="_c1e4d636-bf47-46eb-8431-ca3ac8a06e3c" id="sec.602-def.unpaidpetroleumroyalty" type="definition">unpaid petroleum royalty</defterm>) is unpaid from time to time.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c6c4c9de-6c45-49ff-8d03-1a377ac7dee1" id="sec.602-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The person must pay interest (<defterm guid="_eaf066d4-b092-487e-bfde-8b0b6ab5a72e" id="sec.602-def.unpaidroyaltyinterest" type="definition">unpaid royalty interest</defterm>) on the unpaid petroleum royalty.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_319e3b37-9cef-44c8-bf62-4ae77ed09a12" id="sec.602-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Unpaid royalty interest accrues on unpaid petroleum royalty—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2f539744-f12f-4431-bb2b-b303e9007688" id="sec.602-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">at the rate prescribed under a regulation; and</txt></block></li><li guid="_980c5d9e-45c5-4d2d-96f3-60fe21e355b6" id="sec.602-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">daily, for the period starting on the day after the amount is required to be paid under this Act and ending on the day the unpaid petroleum royalty is paid in full, both days inclusive.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_add44283-e66c-4fee-b9a5-826d792d20a1" id="sec.602-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A regulation may prescribe how unpaid royalty interest is worked out in particular cases or classes of cases, including, for example, how the interest is worked out if royalty is, under a regulation, payable in instalments.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_edf975a9-e55b-4a8f-849a-81763dd481e6" id="sec.602-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The order of application of a payment under <intref check="valid" refid="sec.602A" target.guid="_241fb059-10b1-4f01-98f0-6d347e8cded5">section 602A</intref> applies to determine the amount of unpaid petroleum royalty on which unpaid royalty interest accrues.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_16ee60d5-f6f3-47bf-93ec-951e50a65cbe" id="sec.602-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The Minister may remit the whole or part of unpaid royalty interest payable under this section.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_54d9c010-b1c0-4c94-aa2d-e02c4b21ab3f" id="sec.602-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">If a regulation made under <intref check="valid" refid="sec.602-ssec.4" target.guid="_add44283-e66c-4fee-b9a5-826d792d20a1">subsection (4)</intref> provides for unpaid royalty interest to be worked out if royalty is payable by instalments, and the Minister decides to remit to a petroleum producer the whole or part of the interest under <intref check="valid" refid="sec.602-ssec.6" target.guid="_16ee60d5-f6f3-47bf-93ec-951e50a65cbe">subsection (6)</intref> payable for an instalment, the Minister must give the producer a notice stating the amount to be remitted.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_39bcdaee-f974-4662-999a-539b7f8667ff" id="sec.602-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.602-ssec.7" target.guid="_54d9c010-b1c0-4c94-aa2d-e02c4b21ab3f">subsection (7)</intref> only applies if the amount of unpaid royalty interest is to be remitted before an assessment notice is given for the remittance.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_241fb059-10b1-4f01-98f0-6d347e8cded5" id="sec.602A" provision.type="other" spent.amends="0"><no>602A</no><heading guid="_33af5304-05e1-4737-95e0-4aee633fc35e" id="sec.602A-he">Application of payments</heading><block><txt break.before="1">A payment made by a person to the State for a royalty-related amount must be applied in the following order—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_324df559-a3d1-4659-be83-b847d024e497" id="sec.602A-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">first, a royalty-related amount, other than unpaid royalty interest or petroleum royalty;</txt></block></li><li guid="_710bf6da-1b0c-4dfa-a408-1bf47df70ef2" id="sec.602A-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">second, unpaid royalty interest;</txt></block></li><li guid="_cb573c72-fbf4-4f31-ade4-c6cc3b2a7e25" id="sec.602A-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">last, petroleum royalty.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_c857c5e3-26e3-4a49-b708-9abfa1655974" id="sec.603" provision.type="other" spent.amends="0"><no>603</no><heading guid="_155a22e5-9584-47e9-afe0-b3408b086952" id="sec.603-he">Recovery of unpaid amounts</heading><block><txt break.before="1">If a petroleum producer does not pay a royalty-related amount payable by the producer under this Act, the State may recover from the producer as a debt the amount of the royalty-related amount.</txt></block></clause><clause affected.by.uncommenced="0" guid="_1fda434c-a924-4da9-8518-ef1fe7c1615e" id="sec.604" provision.type="other" spent.amends="0"><no>604</no><heading guid="_44e7a2c5-6dc9-4619-a749-014535780cb3" id="sec.604-he">Earlier time for payment of royalty-related amount</heading><subclause affected.by.uncommenced="0" guid="_cbd9fdce-2856-4ea1-9c87-1fcd2f3038f6" id="sec.604-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies despite any other provision of this Act relating to when a royalty-related amount is payable by a petroleum producer for a period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b347ecdd-d09d-4b7a-971a-99674babeb99" id="sec.604-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister may, in an assessment notice or notice given under this section, state an earlier date than the date the royalty-related amount would otherwise be payable under this Act (the <defterm guid="_a77541a7-19af-4f28-a601-59363be423d2" id="sec.604-def.ordinaryduedate" type="definition">ordinary due date</defterm>), if the Minister reasonably believes the amount may not be recoverable if the ordinary due date were to apply.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2e2449fa-4d8e-47c9-86c8-8c37a399d15e" id="sec.604-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The date stated in the notice mentioned in <intref check="valid" refid="sec.604-ssec.2" target.guid="_b347ecdd-d09d-4b7a-971a-99674babeb99">subsection (2)</intref> must not be a date before the notice is given.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_38b68173-fa12-44d1-beed-9b5a7e25811b" id="sec.604A" provision.type="other" spent.amends="0"><no>604A</no><heading guid="_392bad9a-061b-41a4-85f6-bc9939a55b88" id="sec.604A-he">Regulation may impose civil penalties</heading><subclause affected.by.uncommenced="0" guid="_2ae57790-f2ca-4d59-9554-2ad299c6d62e" id="sec.604A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a regulation provides for a person to make an election about the time and manner, or amount, of payment of petroleum royalty to the State.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_de57214b-53cb-4dfa-b32f-7a078869b09d" id="sec.604A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">To deter exploitation of the provision, the regulation may impose a civil penalty—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_48fab5b9-8f33-441f-b741-94cc8453e54a" id="sec.604A-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for contravention of a prescribed requirement; or</txt></block></li><li guid="_a0d7d37a-2438-4170-ba25-f8bdbfde3193" id="sec.604A-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">in other prescribed circumstances.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7878fca0-ee63-4e8f-b1d4-d46bf7b8b6e8" id="sec.604A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The amount of the civil penalty must be a prescribed amount or a prescribed percentage of petroleum royalty payable.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_a37c41c1-27bf-4f02-9771-f9acc51efd1d" id="ch.6-pt.3-div.2"><no>Division 2</no><heading guid="_56094af6-cfbf-4a88-962d-04c5a1d1fc75" id="ch.6-pt.3-div.2-he">Obligations of administrators and garnishees</heading><clause affected.by.uncommenced="0" guid="_9df0b4e0-2f1f-410e-ba01-0a61e66f9f74" id="sec.604AA" provision.type="other" spent.amends="0"><no>604AA </no><heading guid="_e6fac2fb-241c-4aaf-9aaa-abdf25de5b1a" id="sec.604AA-he">Definitions for <intref check="valid" refid="ch.6-pt.3-div.2" target.guid="_a37c41c1-27bf-4f02-9771-f9acc51efd1d">div 2</intref></heading><block><txt break.before="1">In this division—</txt><deflist><definition affected.by.uncommenced="0" guid="_97f9b7b7-1857-42c6-883a-98231ca34c37" id="sec.604AA-def.administrator_"><txt break.before="1"><defterm guid="_d98ac268-a6fb-4925-a164-ed322d29d86f" id="sec.604AA-def.administrator" type="definition">administrator</defterm>, for a person’s property, means another person who is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_48da8281-c226-431e-8604-8715d177407b" id="sec.604AA-def.administrator-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a receiver or receiver and manager of all or part of the person’s property; or</txt></block></li><li guid="_788685fd-b061-47fa-93a4-5a28fc2ab376" id="sec.604AA-def.administrator-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for a corporation’s property—a liquidator; or</txt></block></li><li guid="_c2dd18bc-5690-470e-ac48-7a34ddb16be4" id="sec.604AA-def.administrator-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">for an individual’s property—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b3f7b12f-a70b-4ded-91d7-b1dfef013123" id="sec.604AA-def.administrator-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the individual’s trustee in bankruptcy; or</txt></block></li><li guid="_f3b971c6-7a23-4a64-b93d-f0df94f42b61" id="sec.604AA-def.administrator-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the individual’s personal representative.</txt></block></li></list></block></li></list></definition><definition affected.by.uncommenced="0" guid="_42d4030b-6aa8-41ff-aa90-b6bd6c484c07" id="sec.604AA-def.garnishee_"><txt break.before="1"><defterm guid="_c0d4a520-eace-400f-b628-17a6e43f5182" id="sec.604AA-def.garnishee" type="definition">garnishee</defterm> see <intref check="valid" refid="sec.604AD" target.guid="_74ca95c0-0268-481e-af87-18a71ef6cb4f">section 604AD</intref><intref check="valid" refid="sec.604AD-ssec.1" target.guid="_2f802e34-1993-46d5-a5ad-9b3478409890">(1)</intref><intref check="valid" refid="sec.604AD-ssec.1-para1.b" target.guid="_dc949a5e-7c8e-4612-9c0b-234184673d07">(b)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_4246ef4e-79f3-440f-8b39-e3dcf5c29fb8" id="sec.604AA-def.garnisheeamount_"><txt break.before="1"><defterm guid="_c7ee59a9-4aac-4521-a197-179322897054" id="sec.604AA-def.garnisheeamount" type="definition">garnishee amount</defterm> see <intref check="valid" refid="sec.604AD" target.guid="_74ca95c0-0268-481e-af87-18a71ef6cb4f">section 604AD</intref><intref check="valid" refid="sec.604AD-ssec.3" target.guid="_249157d2-0362-476c-96ff-ac3d783d910e">(3)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_9902c0f6-28ee-49f0-9991-c8fd8be38ded" id="sec.604AA-def.garnisheenotice_"><txt break.before="1"><defterm guid="_874e2175-2dc1-4186-88d2-e0924f76bef2" id="sec.604AA-def.garnisheenotice" type="definition">garnishee notice</defterm> see <intref check="valid" refid="sec.604AD" target.guid="_74ca95c0-0268-481e-af87-18a71ef6cb4f">section 604AD</intref><intref check="valid" refid="sec.604AD-ssec.3" target.guid="_249157d2-0362-476c-96ff-ac3d783d910e">(3)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_a60f139c-b8b4-4e22-8c54-20430ad7d89c" id="sec.604AA-def.liableperson_"><txt break.before="1"><defterm guid="_0d80396b-b151-4c98-b512-577fcf22252d" id="sec.604AA-def.liableperson" type="definition">liable person</defterm> see <intref check="valid" refid="sec.604AD" target.guid="_74ca95c0-0268-481e-af87-18a71ef6cb4f">section 604AD</intref><intref check="valid" refid="sec.604AD-ssec.1" target.guid="_2f802e34-1993-46d5-a5ad-9b3478409890">(1)</intref><intref check="valid" refid="sec.604AD-ssec.1-para1.a" target.guid="_3df41905-b3c5-456a-8688-b5bd0418ad2c">(a)</intref>.</txt></definition></deflist></block></clause><clause affected.by.uncommenced="0" guid="_9629d07e-43f7-4974-9af5-3b1e17928ec3" id="sec.604AB" provision.type="other" spent.amends="0"><no>604AB </no><heading guid="_6b5c7807-93d4-48ed-87a3-fe4b32b0f852" id="sec.604AB-he">Particular administrators to notify Minister of appointment</heading><subclause affected.by.uncommenced="0" guid="_abfae461-5768-4cc8-aa00-a1f3712cc6d7" id="sec.604AB-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person who is appointed as administrator for the property of a person by whom a royalty-related amount is payable must, before the required date, give written notice to the Minister of the appointment.</txt></block><penalty guid="_30ca1bda-c0c2-4b2b-81fb-62dcc59c6ec7" id="sec.604AB-ssec.1-pen"><block><txt break.before="1">Maximum penalty—40 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_9d8e85dc-9ceb-4710-9024-704e8b0ffcb3" id="sec.604AB-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.604AB-ssec.1" target.guid="_abfae461-5768-4cc8-aa00-a1f3712cc6d7">subsection (1)</intref>, the <defterm guid="_462c4ed4-952b-486e-beff-627b6a9eebca" id="sec.604AB-def.requireddate" type="definition">required date</defterm> is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d35c77c2-7597-45ce-b9cf-9ea02d4c3f95" id="sec.604AB-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">14 days after the administrator becomes aware, or should reasonably have become aware, the royalty-related amount is payable by the person even if the extent of the liability is not then ascertainable; or</txt></block></li><li guid="_381f49b6-7076-4455-8029-53927f328153" id="sec.604AB-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the later date allowed by the Minister.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2fb8c17a-9924-470f-a506-26f088983394" id="sec.604AB-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, notice is not required in the circumstances prescribed under a regulation.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d6c0b4a4-83f3-42d3-af5a-53da4901bfd5" id="sec.604AC" provision.type="other" spent.amends="0"><no>604AC </no><heading guid="_0a048ca2-288a-4039-bad1-698d54c70303" id="sec.604AC-he">Administrator’s liability for payment</heading><subclause affected.by.uncommenced="0" guid="_0fb66c7b-3418-4f26-82f7-cd764965fb86" id="sec.604AC-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister has the same powers and remedies in relation to the administrator for the property of a person by whom a royalty-related amount is payable, as the Minister would have in relation to the person.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_68dd9d35-fb3c-441a-805b-088fc9d128a1" id="sec.604AC-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, an administrator is liable for payment of a royalty-related amount payable by a person only to the extent of the realised value of all property that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c467a007-8fe2-4fa6-a22a-55f3309dba44" id="sec.604AC-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the administrator has taken possession of as administrator; and</txt></block></li><li guid="_8e27350c-2ee6-447a-8a4e-3d7394bdc133" id="sec.604AC-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">was, at any time, available to the administrator for the payment of the royalty-related amount.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_74ca95c0-0268-481e-af87-18a71ef6cb4f" id="sec.604AD" provision.type="other" spent.amends="0"><no>604AD </no><heading guid="_fbcb3ab2-7774-49b0-8c0a-2eab5fe0bd00" id="sec.604AD-he">Collection of amounts from a garnishee</heading><subclause affected.by.uncommenced="0" guid="_2f802e34-1993-46d5-a5ad-9b3478409890" id="sec.604AD-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3df41905-b3c5-456a-8688-b5bd0418ad2c" id="sec.604AD-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">under a royalty provision, a debt is payable by a person (the <defterm guid="_20ef758e-e16c-4bee-ad9a-a796595f192c" id="sec.604AD-ssec.1-def.liableperson" type="definition">liable person</defterm>); and</txt></block></li><li guid="_dc949a5e-7c8e-4612-9c0b-234184673d07" id="sec.604AD-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Minister reasonably believes a person (the <defterm guid="_0c810d4d-943f-41b5-a768-1beceb2b55b2" id="sec.604AD-ssec.1-def.garnishee" type="definition">garnishee</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e1aba478-0135-4e5b-88d7-a0c2d49810bd" id="sec.604AD-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">holds or may receive an amount for or on account of the liable person; or</txt></block></li><li guid="_3e961084-4bd7-4845-bdc6-5e0670a9c056" id="sec.604AD-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">is liable or may become liable to pay an amount to the liable person; or</txt></block></li><li guid="_ab182348-d9e6-4851-97dd-2deec0de6d84" id="sec.604AD-ssec.1-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">has authority to pay an amount to the liable person.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_76e98372-73ac-42dc-9417-2e011ac53c01" id="sec.604AD-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.604AD-ssec.1" target.guid="_2f802e34-1993-46d5-a5ad-9b3478409890">Subsection (1)</intref><intref check="valid" refid="sec.604AD-ssec.1-para1.b" target.guid="_dc949a5e-7c8e-4612-9c0b-234184673d07">(b)</intref> applies even though the liable person’s entitlement to the amount may be subject to unfulfilled conditions.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_249157d2-0362-476c-96ff-ac3d783d910e" id="sec.604AD-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister may, by written notice given to the garnishee (the <defterm guid="_430da1f6-bcf1-44df-992a-9f274e9ecf54" id="sec.604AD-def.garnisheenotice" type="definition">garnishee notice</defterm>), require the garnishee to pay to the Minister by a stated date a stated amount (the <defterm guid="_85b48674-6e17-45d0-99f5-fa70a91ca10d" id="sec.604AD-def.garnisheeamount" type="definition">garnishee amount</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4dbec48c-3713-458d-aeee-5d26df67aea3" id="sec.604AD-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.604AD-ssec.3" target.guid="_249157d2-0362-476c-96ff-ac3d783d910e">subsection (3)</intref>, the garnishee notice may require the garnishee to pay to the Minister an amount out of each payment the garnishee is or becomes liable, from time to time, to make to the liable person.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d983d9b5-0981-4623-8532-a47eb068e43c" id="sec.604AD-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">However, if, on the date for payment under the garnishee notice, the garnishee amount is not held for, or is not liable to be paid to, the liable person by the garnishee, the notice has effect as if the date for payment were immediately after the date the amount is held for, or is liable to be paid to, the liable person by the garnishee.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f4ec2eae-54a9-4f4b-83e9-bf3e5a1eb0b5" id="sec.604AD-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The garnishee amount must not be more than the debt.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_13aea382-6d20-471a-bfee-ec488a01c2cf" id="sec.604AD-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">The garnishee must comply with the garnishee notice unless the garnishee has a reasonable excuse.</txt></block><penalty guid="_dc92ce42-3caa-4d33-aca3-f51ff4027965" id="sec.604AD-ssec.7-pen"><block><txt break.before="1">Maximum penalty—40 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_5f59f2cf-2ef2-4475-a83d-d7856d924e7e" id="sec.604AD-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">The Minister must give to the liable person—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3963073b-384a-453a-8d0e-d8d14161bacb" id="sec.604AD-ssec.8-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a copy of the garnishee notice; and</txt></block></li><li guid="_84e321e2-b27c-41b8-9bed-3c52b75a665d" id="sec.604AD-ssec.8-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">details in writing of the liable person’s debt to which the notice relates.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a5a77193-a0a7-4251-a676-d446ab9e9bd3" id="sec.604AE" provision.type="other" spent.amends="0"><no>604AE </no><heading guid="_19cfd340-26e9-4eac-9537-9aa3d239ae89" id="sec.604AE-he">Duration of garnishee notice</heading><block><txt break.before="1">The garnishee notice has effect until the garnishee amount is paid or the Minister, by written notice given to the garnishee, withdraws the notice.</txt></block></clause><clause affected.by.uncommenced="0" guid="_84595fe4-b036-403c-b84e-42bcee84d913" id="sec.604AF" provision.type="other" spent.amends="0"><no>604AF </no><heading guid="_b11ad0f7-383f-4963-a8b3-e496a8db0cfc" id="sec.604AF-he">Effect of discharge of debt on garnishee notice</heading><subclause affected.by.uncommenced="0" guid="_c0769cac-9bd3-49ae-85e6-31d5e1e969b3" id="sec.604AF-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cba58d99-8e61-4e94-a468-c6a01df8044c" id="sec.604AF-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the liable person’s debt to which the garnishee notice relates is discharged, whether completely or partly, before the date for payment of the garnishee amount; and</txt></block></li><li guid="_bff2d7c6-5bf2-443e-b22f-ae83604e16f3" id="sec.604AF-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the discharge affects the amount to be recovered from the garnishee.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9ebd8b44-51a0-4ee0-9cb6-bc9f7378c367" id="sec.604AF-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister must give written notice to the garnishee and the liable person—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_618682bf-081c-4916-8ba5-3f69431dbc94" id="sec.604AF-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">informing them of the extent of the discharge of the debt; and</txt></block></li><li guid="_89d54fd6-f720-4f2b-a5d6-5c5dbe4d8f6a" id="sec.604AF-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">stating the amount payable under the garnishee notice is reduced accordingly; and</txt></block></li><li guid="_dc36c9d8-df2f-4750-bf49-aa680a87e9d8" id="sec.604AF-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the liable person’s debt is fully discharged—withdrawing the garnishee notice.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b1596ac5-bd5f-4927-9aba-1f266a3d6d76" id="sec.604AG" provision.type="other" spent.amends="0"><no>604AG </no><heading guid="_3836d1ca-5bfa-4d59-9db4-b944fba25294" id="sec.604AG-he">Effect of payment by garnishee</heading><block><txt break.before="1">If the garnishee pays an amount to the Minister under a garnishee notice, the garnishee—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3ba49edb-b774-4d9b-be9e-3c8c7363a009" id="sec.604AG-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is taken to have acted under the authority of the liable person and all other persons concerned; and</txt></block></li><li guid="_a3a3b75f-4c72-4d06-8c19-cdfbb7c4447f" id="sec.604AG-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the garnishee is under an obligation to pay an amount to the liable person—is to be taken to have satisfied the obligation to the extent of the payment.</txt></block></li></list></block></clause></division></part><part affected.by.uncommenced="0" guid="_0ebb052e-e7d3-4af1-a2f4-f69daaa75720" id="ch.6-pt.3A"><no>Part 3A</no><heading guid="_83b1e0b1-9464-48b0-9b6c-a8bafdc0b952" id="ch.6-pt.3A-he">Records</heading><clause affected.by.uncommenced="0" guid="_40982bd3-a531-4c20-9f7d-3bcf91e09b28" id="sec.604B" provision.type="other" spent.amends="0"><no>604B</no><heading guid="_f24ad273-76cb-4c6a-ba36-9095ff0c3f7c" id="sec.604B-he">Requirement to keep proper records</heading><subclause affected.by.uncommenced="0" guid="_51eebdb9-2e24-4f36-9589-18e1ea824d2a" id="sec.604B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A petroleum producer to whom <intref check="valid" refid="sec.590" target.guid="_ff4f91a4-c257-4867-b95d-a7d959d6317b">section 590</intref> applies must keep the records necessary to enable the petroleum royalty payable by the person to be ascertained.</txt></block><penalty guid="_62e5d3c0-5ff9-454d-bcce-b7400c3b91bc" id="sec.604B-ssec.1-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_ee105f8d-3f1b-44d8-9b57-dba5e2922a42" id="sec.604B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.604B-ssec.1" target.guid="_51eebdb9-2e24-4f36-9589-18e1ea824d2a">subsection (1)</intref>, the Minister may, by written notice given to a petroleum producer, require the producer to keep a particular record stated in the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5c381ef6-25db-4bb6-8877-1d564ad0809f" id="sec.604B-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The producer must not fail, without reasonable excuse, to comply with the notice.</txt></block><penalty guid="_14ad005d-f384-4b05-ac13-96425a2eab0f" id="sec.604B-ssec.3-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></subclause></clause><clause affected.by.uncommenced="0" guid="_5d5d15ba-a46b-4f84-aa17-c433ba2d0ee9" id="sec.604C" provision.type="other" spent.amends="0"><no>604C</no><heading guid="_070e6735-30cd-4892-9a4e-8741704f16af" id="sec.604C-he">Accessibility of records</heading><block><txt break.before="1">A petroleum producer who is required under this part to keep a record must keep the record in a way that it is able to be readily produced to the Minister if required by the Minister.</txt></block><penalty guid="_7c90e6e6-f98d-4af9-ad40-ec7e2a9209d9" id="sec.604C-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></clause><clause affected.by.uncommenced="0" guid="_d07ed238-e21b-4213-bc58-963c4b34f498" id="sec.604D" provision.type="other" spent.amends="0"><no>604D</no><heading guid="_cf625441-8ab4-4324-b79b-4b1624059ad8" id="sec.604D-he">Form of records</heading><block><txt break.before="1">A petroleum producer who is required under this part to keep a record must keep the record—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6922c360-c39c-441b-8719-b9dd1bffae46" id="sec.604D-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in the form of a document written in English with information about amounts expressed in Australian currency; or</txt></block></li><li guid="_dbcac179-504c-4fe8-abb0-3f8b23eea571" id="sec.604D-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">in a form that can be readily converted or translated into the form mentioned in <intref check="valid" refid="sec.604D-para1.a" target.guid="_6922c360-c39c-441b-8719-b9dd1bffae46">paragraph (a)</intref>.</txt></block></li></list></block><penalty guid="_6193c8a2-f1fc-4f1c-9532-f216ed668648" id="sec.604D-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></clause><clause affected.by.uncommenced="0" guid="_a3a0202f-3c53-41f3-a2fc-ad24babb93d6" id="sec.604E" provision.type="other" spent.amends="0"><no>604E</no><heading guid="_8135982c-95a3-4d4c-9803-897fca70cf35" id="sec.604E-he">Period for keeping records</heading><block><txt break.before="1">A petroleum producer who is required under this part to keep a record must keep it until the later of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8e06b936-acb3-4a3f-b045-8407cbfdf8d9" id="sec.604E-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">5 years has elapsed after it was made or obtained;</txt></block></li><li guid="_58dd494a-f47e-436f-9145-03e06455547e" id="sec.604E-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">5 years has elapsed after the completion of the transaction or matter to which it relates.</txt></block></li></list></block><penalty guid="_35c37dfe-45f9-40f7-bace-befd7122a59d" id="sec.604E-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></clause><clause affected.by.uncommenced="0" guid="_f9481c95-c8fc-4338-81cb-6152f1a10768" id="sec.604F" provision.type="other" spent.amends="0"><no>604F</no><heading guid="_452fbdfd-c521-4d0a-9fd2-a867fe8cda06" id="sec.604F-he">Wilfully damaging records</heading><subclause affected.by.uncommenced="0" guid="_8da62b4e-bea8-4f01-ba86-6b0ac0953dee" id="sec.604F-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not wilfully damage a record that is required to be kept under this part.</txt></block><penalty guid="_a83a3f1f-e8ee-414c-85c5-9bce50458632" id="sec.604F-ssec.1-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty><note guid="_0b4e4d2d-97ea-433a-ad5b-3e71b4e755ba" id="sec.604F-ssec.1-note" type="example"><heading guid="_03c22525-6b76-4586-95fb-bdcb36b09f51" id="sec.604F-ssec.1-note-he">Note—</heading><block><txt break.before="1">This provision is an executive liability provision—see <intref check="valid" refid="sec.814" target.guid="_9fa8e8a1-4511-4ac6-b2de-5b287f47ce16">section 814</intref>.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_a590bdb9-c95a-4ff4-9ef3-e9e18b353e61" id="sec.604F-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_6a28eed2-ac5e-4893-b751-abb37633975c" id="sec.604F-ssec.2-def.damage_"><txt break.before="1"><defterm guid="_3da8042e-ded9-44f0-a954-d10b91848df7" id="sec.604F-ssec.2-def.damage" type="definition">damage</defterm> includes destroy.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_85b14ca2-1bf2-4882-bf34-9c1e66f29629" id="sec.604G" provision.type="other" spent.amends="0"><no>604G</no><heading guid="_6c674300-c0e5-4cc5-93be-0f607712cc67" id="sec.604G-he">Minister may require translation or conversion of document or information</heading><subclause affected.by.uncommenced="0" guid="_db5e1c21-cc1f-4898-b249-5d1138721ed8" id="sec.604G-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may, by written notice given to a person, require the person to translate or convert into a written document in the English language and Australian currency any document or information the Minister reasonably believes is relevant to the administration or enforcement of a royalty provision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9662588a-b6ff-4c1e-bebd-a6f445119e21" id="sec.604G-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must state the reasonable time for compliance with the requirement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_79fc2988-707c-496e-9faf-35bc07bba80f" id="sec.604G-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The person must not fail, without reasonable excuse, to comply with the requirement.</txt></block><penalty guid="_e735b862-a0b0-4684-9db0-cb57b86efb08" id="sec.604G-ssec.3-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_5a8aa355-7243-42c6-a175-768d0514c4aa" id="sec.604G-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the person does not comply with the requirement, the Minister may have the document or information translated or converted.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7b104b67-bd9e-4c44-a522-ca0ac6a87250" id="sec.604G-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The costs and expenses incurred under <intref check="valid" refid="sec.604G-ssec.4" target.guid="_5a8aa355-7243-42c6-a175-768d0514c4aa">subsection (4)</intref> are a debt payable to the State by the person and may be recovered by the State in a court of competent jurisdiction.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_2fb088f3-cddf-48c1-8eac-64c2a5d99b20" id="ch.6-pt.4"><no>Part 4</no><heading guid="_f7a9f7b1-8fda-4825-8b20-13526fcfe37f" id="ch.6-pt.4-he">Offences for royalty provisions</heading><clause affected.by.uncommenced="0" guid="_1995a4d0-b996-44ba-beeb-2ac1ae20e2dd" id="sec.605" provision.type="other" spent.amends="0"><no>605</no><heading guid="_6a2dbdb2-6f4d-4cd2-b102-2cd576337cfa" id="sec.605-he">Failure to comply with information requirement or lodgement requirement</heading><subclause affected.by.uncommenced="0" guid="_06cafdac-cbfd-4a79-bc56-d838329eb3a7" id="sec.605-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not fail, without reasonable excuse, to comply with an information requirement or a lodgement requirement.</txt></block><penalty guid="_ba8f42b4-2b9c-49c0-a121-361e80412bbf" id="sec.605-ssec.1-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty><note guid="_da53d64a-2a74-47c3-9ac0-8e07b25a94f7" id="sec.605-ssec.1-note" type="example"><heading guid="_dff6d530-86ba-4003-9a83-e9d47f2a42ff" id="sec.605-ssec.1-note-he">Note—</heading><block><txt break.before="1">This provision is an executive liability provision—see <intref check="valid" refid="sec.814" target.guid="_9fa8e8a1-4511-4ac6-b2de-5b287f47ce16">section 814</intref>.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_a68887af-6bf7-412d-8278-380f7d08a829" id="sec.605-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_c17e6fd6-ab8b-4a5c-a2d6-81bea61a6117" id="sec.605-ssec.2-def.informationrequirement_"><txt break.before="1"><defterm guid="_98e4042d-b66d-42c7-a58b-4062f983a048" id="sec.605-ssec.2-def.informationrequirement" type="definition">information requirement</defterm> means a requirement under a royalty provision to give information to the Minister or a royalty investigator.</txt></definition><definition affected.by.uncommenced="0" guid="_5807d3aa-30b1-402c-8471-bd6cc18f5ca1" id="sec.605-ssec.2-def.lodgementrequirement_"><txt break.before="1"><defterm guid="_dc7f4ff7-d11c-4511-9e77-145d80ec6fd2" id="sec.605-ssec.2-def.lodgementrequirement" type="definition">lodgement requirement</defterm> means a requirement under a royalty provision to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_18c825b0-3c05-4994-a9ab-f37276d6242e" id="sec.605-ssec.2-def.lodgementrequirement-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">lodge a document; or</txt></block></li><li guid="_0e041a97-8ae3-45b0-945f-16105d3939e1" id="sec.605-ssec.2-def.lodgementrequirement-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give a document to the Minister or a royalty investigator.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_9a03a570-6e07-483a-b4ea-7dd1478d8102" id="sec.606" provision.type="other" spent.amends="0"><no>606</no><heading guid="_dad6984c-6db8-4aa9-a324-34970009212b" id="sec.606-he">False or misleading documents</heading><subclause affected.by.uncommenced="0" guid="_85130877-61ba-4a59-92e1-3da027887db7" id="sec.606-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not give to the Minister or a royalty investigator a document containing information that the person knows, or should reasonably know, is false or misleading in a material particular.</txt></block><penalty guid="_32bd5bd9-ff9c-41f1-ac86-42a92eefd655" id="sec.606-ssec.1-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty><note guid="_5e6f794b-57ce-45ea-8282-cd5d5a578db2" id="sec.606-ssec.1-note" type="example"><heading guid="_358eb0af-8199-4892-a4e4-c2ab2cf9e3df" id="sec.606-ssec.1-note-he">Note—</heading><block><txt break.before="1">This provision is an executive liability provision—see <intref check="valid" refid="sec.814" target.guid="_9fa8e8a1-4511-4ac6-b2de-5b287f47ce16">section 814</intref>.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_ab4573ae-7cca-448c-8ed7-cc876e7d659a" id="sec.606-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.606-ssec.1" target.guid="_85130877-61ba-4a59-92e1-3da027887db7">Subsection (1)</intref> does not apply to a person who, when giving the document—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7404b74c-425c-49d4-a72b-5e89246cf75a" id="sec.606-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">tells the Minister or royalty investigator of the extent to which the document is false or misleading; and</txt></block></li><li guid="_718052bf-c90f-4936-b39b-1a1a74f50bd7" id="sec.606-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to the extent the person has, or can reasonably get, the correct information—gives the correct information to the Minister or royalty investigator.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_736b984d-bcab-43de-81cf-b35dc1c21862" id="sec.607" provision.type="other" spent.amends="0"><no>607</no><heading guid="_63096b95-d043-4389-a20f-8f0a67017318" id="sec.607-he">False or misleading information</heading><block><txt break.before="1">A person must not state anything to the Minister or a royalty investigator that the person knows is false or misleading in a material particular.</txt></block><penalty guid="_7c776475-e8db-4dea-8d85-c30c33f046a1" id="sec.607-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty><note guid="_9928842b-2233-4582-9821-3268fc3353c7" id="sec.607-note" type="example"><heading guid="_bcb31a04-2368-4457-bcf8-efee4c9a3f57" id="sec.607-note-he">Note—</heading><block><txt break.before="1">This provision is an executive liability provision—see <intref check="valid" refid="sec.814" target.guid="_9fa8e8a1-4511-4ac6-b2de-5b287f47ce16">section 814</intref>.</txt></block></note></clause><clause affected.by.uncommenced="0" guid="_0a5fe98a-78b5-4ff5-b930-6280847af129" id="sec.608" provision.type="other" spent.amends="0"><no>608</no><heading guid="_955de60f-efe9-426a-a2ef-f65223409618" id="sec.608-he">Self-incrimination not a reasonable excuse for failure to comply with particular requirements</heading><subclause affected.by.uncommenced="0" guid="_722ea8e5-33e9-4bbc-9f2f-3ba2b25e1487" id="sec.608-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, under a royalty provision, a person is required by written notice given to the person to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b7de16e0-0d09-4555-93ef-b8fa10b67156" id="sec.608-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">give information or a document to the Minister or a royalty investigator; or</txt></block></li><li guid="_b15ec551-93ec-44ae-ac54-aa947bfe21ec" id="sec.608-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">lodge a document.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_cec59939-1604-49c1-8581-7d26e6e2cb76" id="sec.608-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">It is not a reasonable excuse for the person to fail to comply with the requirement because complying with the requirement might tend to incriminate the person.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_79886ed9-fae1-43d2-8726-2fe787aa2413" id="sec.608-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, evidence of, or evidence directly or indirectly derived from, information or a document given or lodged in compliance with the requirement, by the person that might tend to incriminate the person is not admissible in evidence against the person in a criminal proceeding, other than a proceeding in which the falsity or misleading nature of the information or document is relevant.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_4f0cacbe-7dea-43f3-b54a-ce833a25e1dd" id="sec.609" provision.type="other" spent.amends="0"><no>609</no><heading guid="_caef93f4-c430-4256-84b5-c6fc133114c8" id="sec.609-he">Obligation to notify Minister if petroleum royalty under assessed</heading><subclause affected.by.uncommenced="0" guid="_db7d81c0-8740-4b15-8f11-e2ab7da74484" id="sec.609-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must advise the Minister if the person becomes aware that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e1ed63cd-aedf-457c-8f3a-b6b088bd8fca" id="sec.609-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an assessment or reassessment of a royalty-related amount payable by the person for a royalty return period or annual return period was not, or is no longer, correct; and</txt></block></li><li guid="_05dde911-5dc0-454f-8b51-b556201b2c5e" id="sec.609-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the correct royalty-related amount payable is more than the amount stated in the assessment notice for the assessment or reassessment for the period.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d2f3ff8e-9792-4c0c-acd5-0885d9c9347c" id="sec.609-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The person must comply with <intref check="valid" refid="sec.609-ssec.1" target.guid="_db7d81c0-8740-4b15-8f11-e2ab7da74484">subsection (1)</intref> within 30 days after becoming aware of the matters mentioned in the subsection.</txt></block><penalty guid="_4ff72916-2c4c-4d91-a52a-0fc1a4724132" id="sec.609-ssec.2-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></subclause></clause><clause affected.by.uncommenced="0" guid="_09223ce6-9822-4af0-a232-7e0560a877e8" id="sec.610" provision.type="other" spent.amends="0"><no>610</no><heading guid="_833d0607-63c0-4b82-9696-7a5e96cc4df1" id="sec.610-he">Obstruction of Minister or royalty investigator</heading><block><txt break.before="1">A person must not, without reasonable excuse, obstruct—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_08f464aa-c043-4cb7-8b95-38af3aba16bd" id="sec.610-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the Minister or a royalty investigator exercising a power under a royalty provision; or</txt></block></li><li guid="_bf0ea521-2517-45ff-b179-a29540d9fa31" id="sec.610-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a person properly helping the Minister or an investigator exercising a power under a royalty provision.</txt></block></li></list></block><penalty guid="_d918d5a8-47fe-4a43-b051-b88f1aacf31a" id="sec.610-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></clause><clause affected.by.uncommenced="0" guid="_2f7abd27-7b09-46c9-afe4-a2fb69c0c5d9" id="sec.611" provision.type="other" spent.amends="0"><no>611</no><heading guid="_0c211093-4d1b-48fa-8366-e9db6de79e35" id="sec.611-he">Impersonation of royalty investigator</heading><block><txt break.before="1">A person must not pretend to be a royalty investigator.</txt></block><penalty guid="_eed6a306-241e-4bde-909c-7361ca70875b" id="sec.611-pen"><block><txt break.before="1">Maximum penalty—40 penalty units.</txt></block></penalty></clause></part><part affected.by.uncommenced="0" guid="_7de3744d-7dcf-454e-9cf0-968ad6bd9b41" id="ch.6-pt.4A"><no>Part 4A</no><heading guid="_35e88e16-c782-4177-879f-c0bc63f137ee" id="ch.6-pt.4A-he">Investigations relating to royalty provisions</heading><division affected.by.uncommenced="0" guid="_622d9fd6-724e-4b32-a672-615bc535275b" id="ch.6-pt.4A-div.1"><no>Division 1</no><heading guid="_02854dab-9d78-4dbc-a917-39bce8abd5d3" id="ch.6-pt.4A-div.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_93665396-7f2f-4f58-92b0-1b0c6a4c05f5" id="sec.612" provision.type="other" spent.amends="0"><no>612</no><heading guid="_8bc56df6-19a1-4802-bc17-70ff1bdb4bf2" id="sec.612-he">Powers to be exercised only for administering and enforcing royalty provisions</heading><block><txt break.before="1">A power conferred on the Minister or a royalty investigator under this part may be exercised only for the administration or enforcement of a provision of this Act administered by the Minister responsible for administering the <legref check="valid" jurisd="QLD" target.doc.id="act-2001-072" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act"><name emphasis="yes">Taxation Administration Act 2001</name></legref> (a <defterm guid="_6c831943-ec4a-47da-926a-3fd459e3545c" id="def.royaltyprovision" type="definition">royalty provision</defterm>).</txt><note guid="_73534616-f538-4ed8-a757-8827526be4bb" id="sec.612-note" type="example"><heading guid="_05800aeb-336c-44c3-b9d3-91c9fefcca09" id="sec.612-note-he">Note—</heading><block><txt break.before="1">On the commencement of this section, the Minister responsible for administering the <legref check="valid" jurisd="QLD" target.doc.id="act-2001-072" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act"><name emphasis="yes">Taxation Administration Act 2001</name></legref> was responsible for administering this Act to the extent that it was relevant to petroleum royalties.</txt></block></note></block></clause></division><division affected.by.uncommenced="0" guid="_3c3c6741-fb95-461d-8390-59991fe31bb9" id="ch.6-pt.4A-div.2"><no>Division 2</no><heading guid="_32722a2e-cfdb-4008-911e-de9d8648b49e" id="ch.6-pt.4A-div.2-he">Royalty investigators</heading><clause affected.by.uncommenced="0" guid="_7720b861-d028-4379-b24b-effbd096c42a" id="sec.613" provision.type="other" spent.amends="0"><no>613</no><heading guid="_c26ccaa2-1938-44b7-b5e3-dd7a6ac0afc4" id="sec.613-he">Appointment</heading><block><txt break.before="1">The Minister may appoint an appropriately qualified public service employee as a royalty investigator.</txt></block></clause><clause affected.by.uncommenced="0" guid="_28073ab9-68a3-4f7f-bdc0-5766be49d07a" id="sec.614" provision.type="other" spent.amends="0"><no>614</no><heading guid="_7c899c4a-f2e9-4185-84d1-00bfd5abe866" id="sec.614-he">Appointment conditions and limit on powers</heading><subclause affected.by.uncommenced="0" guid="_e523cda1-eacb-471d-8d63-00bd76291fae" id="sec.614-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A royalty investigator holds office on any conditions stated in—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d47f7f5a-d0d5-4ce5-864f-0bc3403efe5a" id="sec.614-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the royalty investigator’s instrument of appointment; or</txt></block></li><li guid="_4240fcb8-6752-44ef-9d92-296c17b0829d" id="sec.614-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a signed notice given to the royalty investigator; or</txt></block></li><li guid="_8c81d61f-e1c7-4ddc-8c56-dfe142be691d" id="sec.614-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3a1c4fbd-8692-4a6e-9a1e-5203963f63bf" id="sec.614-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The instrument of appointment, a signed notice given to the royalty investigator or a regulation may limit the royalty investigator’s powers under this part.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ffd6705d-ebb3-4249-a97f-c243a97efa98" id="sec.614-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_f6e3d850-1a7a-4890-bc4c-3aa549161d4b" id="sec.614-ssec.3-def.signednotice_"><txt break.before="1"><defterm guid="_42f80893-afa6-4735-8571-e33bfdab9738" id="sec.614-ssec.3-def.signednotice" type="definition">signed notice</defterm> means a notice signed by the Minister.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b264fc00-2437-43a0-9e4c-95419b5ea3c3" id="sec.615" provision.type="other" spent.amends="0"><no>615</no><heading guid="_b6e9319c-626a-4447-a5be-5f83045874fd" id="sec.615-he">Issue of identity card</heading><subclause affected.by.uncommenced="0" guid="_43388f38-c8ee-4416-9dc7-29a603819ba8" id="sec.615-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister must issue an identity card to each royalty investigator.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_64f2b99a-0ba0-4999-902a-29852eff9c98" id="sec.615-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The identity card must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2fefe1c1-7dd3-4699-a51e-cde1bc770572" id="sec.615-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">contain a recent photo of the royalty investigator; and</txt></block></li><li guid="_5982e868-6ade-40a2-a518-f66577ade13f" id="sec.615-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">contain a copy of the royalty investigator’s signature; and</txt></block></li><li guid="_d8a3da96-805e-4293-979d-c3e0bfbd7662" id="sec.615-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">identify the person as a royalty investigator under this Act; and</txt></block></li><li guid="_1d6a74a4-dcf6-4fd2-8d21-5a3d2640a80f" id="sec.615-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">state an expiry date for the card.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2a3a39f2-ef7f-4593-9a04-996361deca89" id="sec.615-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">This section does not prevent the issue of a single identity card to a person for this Act and other purposes.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e08938f2-7f28-4378-bc2d-16a3f23256d5" id="sec.616" provision.type="other" spent.amends="0"><no>616</no><heading guid="_3fe0666c-bf72-40d1-92d9-6ffc327417b5" id="sec.616-he">Production of identity card</heading><subclause affected.by.uncommenced="0" guid="_29795687-686b-4f9b-a69d-3ed92c3158db" id="sec.616-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">In exercising a power mentioned in the <legref check="valid" jurisd="QLD" target.doc.id="act-2001-072" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act"><name emphasis="yes">Taxation Administration Act 2001</name></legref>, <legref check="valid" jurisd="QLD" refid="pt.7" target.doc.id="act-2001-072" target.guid="_42cc135b-6dcc-4547-a638-e88cfdad21b6" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act">part 7</legref>, <legref check="valid" jurisd="QLD" refid="pt.7-div.2" target.doc.id="act-2001-072" target.guid="_9f28c6c6-0a51-43e6-8a17-730e45d61be1" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act">division 2</legref>, <legref check="invalid" jurisd="QLD" type="act">subdivision 3</legref> or <legref check="valid" jurisd="QLD" refid="pt.7-div.2-sdiv.4" target.doc.id="act-2001-072" target.guid="_5c106254-c4c4-4fa2-b04b-aa8cf4be4335" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act">4</legref> as applied under <intref check="valid" refid="ch.6-pt.4A-div.3" target.guid="_df01cc9c-f36d-48cd-99d9-7db9ed04184c">division 3</intref> of this Act in relation to a person, a royalty investigator must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ba27214e-235d-4950-b277-e0be4a623ba3" id="sec.616-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">first produce his or her identity card for the person’s inspection before exercising the power; or</txt></block></li><li guid="_4888c3c4-6653-4c79-b628-7a5905267991" id="sec.616-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">have the identity card displayed so it is clearly visible to the person when exercising the power.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7fb31a88-9874-4695-ad58-613206f3301a" id="sec.616-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if it is not practicable to comply with <intref check="valid" refid="sec.616-ssec.1" target.guid="_29795687-686b-4f9b-a69d-3ed92c3158db">subsection (1)</intref>, the royalty investigator must produce the identity card for the person’s inspection at the first reasonable opportunity.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ac4e975f-4a57-4307-87d3-ea841db09096" id="sec.616-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For <intref check="valid" refid="sec.616-ssec.1" target.guid="_29795687-686b-4f9b-a69d-3ed92c3158db">subsection (1)</intref>, a royalty investigator does not exercise a power in relation to a person only because the investigator has entered a place as mentioned in the <legref check="valid" jurisd="QLD" target.doc.id="act-2001-072" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act"><name emphasis="yes">Taxation Administration Act 2001</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.90" target.doc.id="act-2001-072" target.guid="_e87db16a-eef6-46c9-891d-a803ace7fcc0" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act">section 90</legref><legref check="invalid" jurisd="QLD" type="act">(1)</legref><legref check="invalid" jurisd="QLD" type="act">(b)</legref> or <legref check="invalid" jurisd="QLD" type="act">(2)</legref>, as applied under <intref check="valid" refid="ch.6-pt.4A-div.3" target.guid="_df01cc9c-f36d-48cd-99d9-7db9ed04184c">division 3</intref> of this Act.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b232dcc6-b377-4a53-98b7-34f5f79a3b3b" id="sec.616A" provision.type="other" spent.amends="0"><no>616A</no><heading guid="_bc829c44-14aa-45c4-9021-b1bc55dbf5de" id="sec.616A-he">When royalty investigator ceases to hold office</heading><subclause affected.by.uncommenced="0" guid="_c4e8c696-8b52-475a-8020-b019a5045e74" id="sec.616A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A royalty investigator ceases to hold office if any of the following happens—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_745de4d5-66cd-4d1a-8ab5-887a551e9c57" id="sec.616A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the term of office stated in a condition of office ends;</txt></block></li><li guid="_df6290e6-d32f-4a78-879f-281f792728ab" id="sec.616A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">under another condition of the office, the royalty investigator ceases to hold office;</txt></block></li><li guid="_ce8cb40d-a651-4e30-b5df-7fc548aef5e7" id="sec.616A-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the royalty investigator’s resignation under <intref check="valid" refid="sec.616B" target.guid="_c8bffb4b-17ac-4b39-b8ea-844037fab533">section 616B</intref> takes effect.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2f2c1694-6b0d-4cb2-b950-26eb640a09e6" id="sec.616A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.616A-ssec.1" target.guid="_c4e8c696-8b52-475a-8020-b019a5045e74">Subsection (1)</intref> does not limit the ways a royalty investigator may cease to hold office.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f265a713-b856-4c69-81c1-b0c3a9645c65" id="sec.616A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_689334b4-ee4b-445d-8dff-b853994c1636" id="sec.616A-ssec.3-def.conditionofoffice_"><txt break.before="1"><defterm guid="_07fd79ca-0500-4f68-b011-235d562c636c" id="sec.616A-ssec.3-def.conditionofoffice" type="definition">condition of office</defterm> means a condition on which a royalty investigator holds office.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c8bffb4b-17ac-4b39-b8ea-844037fab533" id="sec.616B" provision.type="other" spent.amends="0"><no>616B</no><heading guid="_83ea25ff-0194-4854-8c08-39b727eb04cb" id="sec.616B-he">Resignation</heading><subclause affected.by.uncommenced="0" guid="_552e9e75-92d6-4fd6-907c-adf7250fc813" id="sec.616B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A royalty investigator may resign by signed notice given to the Minister.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_15eaf21a-5ecb-45b6-8c3e-a50ece92e487" id="sec.616B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if holding office as a royalty investigator is a condition of the investigator holding another office, the investigator may not resign as a royalty investigator without resigning from the other office.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_eb60f15f-2919-4f83-b22c-84f8664ffe34" id="sec.616C" provision.type="other" spent.amends="0"><no>616C</no><heading guid="_86ef8220-acec-4e9e-9b99-23a900977ba1" id="sec.616C-he">Return of identity card</heading><block><txt break.before="1">A person who ceases to be a royalty investigator must return the person’s identity card to the Minister within 21 days after ceasing to be a royalty investigator unless the person has a reasonable excuse.</txt></block><penalty guid="_58b2c2f2-268d-4a61-b633-044329ed35c5" id="sec.616C-pen"><block><txt break.before="1">Maximum penalty—40 penalty units.</txt></block></penalty></clause></division><division affected.by.uncommenced="0" guid="_df01cc9c-f36d-48cd-99d9-7db9ed04184c" id="ch.6-pt.4A-div.3"><no>Division 3</no><heading guid="_fd99434b-ba8d-45a5-b40e-86cb2c9caa22" id="ch.6-pt.4A-div.3-he">Powers of royalty investigators</heading><clause affected.by.uncommenced="0" guid="_eaecd20c-cb8f-4407-bfb5-7d00cd28116b" id="sec.616D" provision.type="other" spent.amends="0"><no>616D</no><heading guid="_8d315140-1ae9-48f6-97aa-1591c102fd31" id="sec.616D-he">Application of <legref check="valid" jurisd="QLD" target.doc.id="act-2001-072" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act"><name emphasis="yes">Taxation Administration Act 2001</name></legref>, <legref check="valid" jurisd="QLD" refid="pt.7" target.doc.id="act-2001-072" target.guid="_42cc135b-6dcc-4547-a638-e88cfdad21b6" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act">pt 7</legref></heading><subclause affected.by.uncommenced="0" guid="_bb775a99-3562-4771-9914-682b27aa064e" id="sec.616D-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister and a royalty investigator have and may exercise—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2fd06f07-ee19-4409-a308-18a07ac2a2b3" id="sec.616D-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the same powers as those conferred on the commissioner or an investigator under the <legref check="valid" jurisd="QLD" target.doc.id="act-2001-072" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act"><name emphasis="yes">Taxation Administration Act 2001</name></legref>, <legref check="valid" jurisd="QLD" refid="pt.7" target.doc.id="act-2001-072" target.guid="_42cc135b-6dcc-4547-a638-e88cfdad21b6" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act">part 7</legref>, <legref check="valid" jurisd="QLD" refid="pt.7-div.2" target.doc.id="act-2001-072" target.guid="_9f28c6c6-0a51-43e6-8a17-730e45d61be1" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act">division 2</legref>, <legref check="valid" jurisd="QLD" refid="pt.7-div.2" target.doc.id="act-2001-072" target.guid="_9f28c6c6-0a51-43e6-8a17-730e45d61be1" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act">subdivisions 2</legref> to <legref check="valid" jurisd="QLD" refid="pt.7-div.2-sdiv.6" target.doc.id="act-2001-072" target.guid="_31d2e08b-de75-448d-9958-03e6bec42c5e" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act">6</legref> (the <defterm guid="_45d49530-abec-44db-ac80-6ebf252ac684" id="sec.616D-ssec.1-def.taxationinvestigationprovisions" type="definition">taxation investigation provisions</defterm>); and</txt><note guid="_823d82d4-696d-4c65-8557-5f47d3f9f6eb" id="sec.616D-ssec.1-para1.a-note" type="example"><heading guid="_bb7f54c9-3930-4db6-be19-5c9a67f48e71" id="sec.616D-ssec.1-para1.a-note-he">Note—</heading><block><txt break.before="1">Under the <legref check="valid" jurisd="QLD" target.doc.id="act-1954-003" target.version.series="3cfb010e-ce09-4afd-baf6-bd10d22741a7" type="act"><name emphasis="yes">Acts Interpretation Act 1954</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.7" target.doc.id="act-1954-003" target.guid="_38be38d5-7de4-42da-aada-a3eac0e5fddc" target.version.series="3cfb010e-ce09-4afd-baf6-bd10d22741a7" type="act">section 7</legref>, a reference to a provision of a law includes a reference to the statutory instruments made or in force under the provision.</txt></block></note></block></li><li guid="_8962b0b9-ed85-4aa1-b62b-360f9868eb22" id="sec.616D-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">another power conferred on a royalty investigator under this part.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_41544fb9-6f32-49dd-8bf1-503ea30c97a9" id="sec.616D-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The taxation investigation provisions apply, with all necessary changes, including those mentioned in <intref check="valid" refid="sec.616D-ssec.3" target.guid="_ddccf9bd-db8f-4696-8a99-d65dc2fc7592">subsection (3)</intref>, and with the modifications made under <intref check="valid" refid="sec.616D-ssec.4" target.guid="_66673d1c-f7f1-4512-be85-22c35ece2a53">subsection (4)</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_530685cd-ea62-45fb-8bb3-3795a1a453fd" id="sec.616D-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to and in relation to the exercise of the powers under the taxation investigation provisions by the Minister or a royalty investigator; and</txt></block></li><li guid="_6363f294-3672-4cb7-9221-f8087f471feb" id="sec.616D-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to and in relation to a person in relation to whom the powers are exercised.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ddccf9bd-db8f-4696-8a99-d65dc2fc7592" id="sec.616D-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For <intref check="valid" refid="sec.616D-ssec.2" target.guid="_41544fb9-6f32-49dd-8bf1-503ea30c97a9">subsection (2)</intref>, necessary changes to the taxation investigation provisions include the following, subject to the modifications made under <intref check="valid" refid="sec.616D-ssec.4" target.guid="_66673d1c-f7f1-4512-be85-22c35ece2a53">subsection (4)</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_38862c07-0847-4df9-8b76-112b9dfcf293" id="sec.616D-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a reference to a tax law were a reference to a royalty provision;</txt></block></li><li guid="_d0db9a92-de4a-4d12-a5ed-2fae92f99d7a" id="sec.616D-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a reference to an investigator were a reference to a royalty investigator;</txt></block></li><li guid="_760a27c9-311f-478e-a459-9c879361066f" id="sec.616D-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a reference to an identity card were a reference to an identity card issued under <intref check="valid" refid="ch.6-pt.4A-div.2" target.guid="_3c3c6741-fb95-461d-8390-59991fe31bb9">division 2</intref>;</txt></block></li><li guid="_58292f64-0dda-46c7-8f85-11e95b1e077e" id="sec.616D-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a reference to the commissioner were a reference to the Minister, other than the reference in the <legref check="valid" jurisd="QLD" target.doc.id="act-2001-072" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act"><name emphasis="yes">Taxation Administration Act 2001</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.106" target.doc.id="act-2001-072" target.guid="_5359dafb-ba75-4d79-a7cf-b17d3e104da8" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act">section 106</legref>;</txt></block></li><li guid="_7cbecb48-f6a8-44fa-9a1b-47fdb79595a4" id="sec.616D-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">a reference in the <legref check="valid" jurisd="QLD" target.doc.id="act-2001-072" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act"><name emphasis="yes">Taxation Administration Act 2001</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.88" target.doc.id="act-2001-072" target.guid="_5ed4a2c2-5f9a-439b-b7ce-5ec7c99c3c14" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act">section 88</legref><legref check="invalid" jurisd="QLD" type="act">(7)</legref> to a taxpayer were a reference to a person required to pay petroleum royalty under <intref check="valid" refid="sec.590" target.guid="_ff4f91a4-c257-4867-b95d-a7d959d6317b">section 590</intref>;</txt></block></li><li guid="_575a8cd3-0c6b-4cae-9f03-b23d2dafb0ec" id="sec.616D-ssec.3-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">the reference in the <legref check="valid" jurisd="QLD" target.doc.id="act-2001-072" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act"><name emphasis="yes">Taxation Administration Act 2001</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.106" target.doc.id="act-2001-072" target.guid="_5359dafb-ba75-4d79-a7cf-b17d3e104da8" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act">section 106</legref> to the commissioner were a reference to the State.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_66673d1c-f7f1-4512-be85-22c35ece2a53" id="sec.616D-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">For <intref check="valid" refid="sec.616D-ssec.2" target.guid="_41544fb9-6f32-49dd-8bf1-503ea30c97a9">subsection (2)</intref>, the taxation investigation provisions are modified in the following ways—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_889d3320-e1c0-4e87-818a-5e48da8fcb5b" id="sec.616D-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-2001-072" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act"><name emphasis="yes">Taxation Administration Act 2001</name></legref>, <legref check="valid" jurisd="QLD" refid="pt.7" target.doc.id="act-2001-072" target.guid="_42cc135b-6dcc-4547-a638-e88cfdad21b6" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act">part 7</legref>, <legref check="valid" jurisd="QLD" refid="pt.7-div.2" target.doc.id="act-2001-072" target.guid="_9f28c6c6-0a51-43e6-8a17-730e45d61be1" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act">division 2</legref>, <legref check="invalid" jurisd="QLD" type="act">subdivision 5</legref> applies subject to <intref check="valid" refid="sec.617" target.guid="_8d0d3de1-9683-44b6-b4a5-a76bce80db39">section 617</intref>; and</txt></block></li><li guid="_dfa4d05a-14c1-4ddf-9a6e-477d5a49e6bc" id="sec.616D-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-2001-072" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act"><name emphasis="yes">Taxation Administration Act 2001</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.99" target.doc.id="act-2001-072" target.guid="_df9dc2fa-4251-4c07-8f9e-737a8d378594" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act">section 99</legref><legref check="invalid" jurisd="QLD" type="act">(2)</legref> does not apply.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_edbf3cac-dbd2-4761-8b2d-c6e84fcf1cd0" id="sec.616D-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">To remove any doubt, it is declared that an offence against a TAA offence provision as applied by <intref check="valid" refid="sec.616D-ssec.2" target.guid="_41544fb9-6f32-49dd-8bf1-503ea30c97a9">subsection (2)</intref> committed by a person is an offence committed by the person under this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0603a7d2-6bc7-4b8f-8df8-90d268871594" id="sec.616D-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_43846da0-0de6-4c84-a0bc-7ae4c7c9f7d3" id="sec.616D-ssec.6-def.TAAoffenceprovision_"><txt break.before="1"><defterm guid="_e9703fa1-f1ce-4eee-9d17-ef91b71feedb" id="sec.616D-ssec.6-def.TAAoffenceprovision" type="definition">TAA offence provision</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3517ea75-424b-4a1c-becd-1e6668724c4c" id="sec.616D-ssec.6-def.TAAoffenceprovision-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-2001-072" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act"><name emphasis="yes">Taxation Administration Act 2001</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.88" target.doc.id="act-2001-072" target.guid="_5ed4a2c2-5f9a-439b-b7ce-5ec7c99c3c14" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act">section 88</legref><legref check="invalid" jurisd="QLD" type="act">(6)</legref>; or</txt></block></li><li guid="_2e6a9fc3-84c1-414a-807a-b83306ade358" id="sec.616D-ssec.6-def.TAAoffenceprovision-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-2001-072" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act"><name emphasis="yes">Taxation Administration Act 2001</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.96" target.doc.id="act-2001-072" target.guid="_372c3ae6-8d8e-4ce7-95c5-27c98c4d79b9" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act">section 96</legref><legref check="invalid" jurisd="QLD" type="act">(2)</legref> or <legref check="invalid" jurisd="QLD" type="act">(4)</legref>.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8d0d3de1-9683-44b6-b4a5-a76bce80db39" id="sec.617" provision.type="other" spent.amends="0"><no>617</no><heading guid="_45f811e5-71a7-4a56-bb7f-3630c563ccb8" id="sec.617-he">Forfeiture of thing seized for testing</heading><subclause affected.by.uncommenced="0" guid="_f08ca711-b676-4c4d-bc79-fd05480c99d0" id="sec.617-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A royalty investigator may carry out, or arrange to have carried out, scientific or other tests on a sample of a thing the royalty investigator reasonably considers is petroleum, seized under the <legref check="valid" jurisd="QLD" target.doc.id="act-2001-072" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act"><name emphasis="yes">Taxation Administration Act 2001</name></legref>, <legref check="valid" jurisd="QLD" refid="pt.7" target.doc.id="act-2001-072" target.guid="_42cc135b-6dcc-4547-a638-e88cfdad21b6" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act">part 7</legref>, <legref check="valid" jurisd="QLD" refid="pt.7-div.2" target.doc.id="act-2001-072" target.guid="_9f28c6c6-0a51-43e6-8a17-730e45d61be1" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act">division 2</legref>, <legref check="invalid" jurisd="QLD" type="act">subdivision 5</legref> as applied by <intref check="valid" refid="sec.616D" target.guid="_eaecd20c-cb8f-4407-bfb5-7d00cd28116b">section 616D</intref><intref check="valid" refid="sec.616D-ssec.2" target.guid="_41544fb9-6f32-49dd-8bf1-503ea30c97a9">(2)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8c5ff465-2c9b-42e1-b4d4-443449ac92b9" id="sec.617-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The testing may have the effect of destroying the thing.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f304a73d-009f-4fa9-b397-46a8531ee8bf" id="sec.617-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The <legref check="valid" jurisd="QLD" target.doc.id="act-2001-072" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act"><name emphasis="yes">Taxation Administration Act 2001</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.99" target.doc.id="act-2001-072" target.guid="_df9dc2fa-4251-4c07-8f9e-737a8d378594" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act">section 99</legref><legref check="invalid" jurisd="QLD" type="act">(1)</legref> does not apply in relation to a thing seized and tested under this section.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_89f29890-11e0-48d3-957e-cf4b610fc40a" id="ch.6-pt.5"><no>Part 5</no><heading guid="_d0e3f90e-414e-4777-bf73-c33acc4d6a05" id="ch.6-pt.5-he">Disclosure and confidentiality</heading><clause affected.by.uncommenced="0" guid="_0a869716-ecec-4789-b1d3-f8e26829d45f" id="sec.617A" provision.type="other" spent.amends="0"><no>617A</no><heading guid="_862b11ea-0d00-4bd5-9868-95995969cfc7" id="sec.617A-he">Definitions for <intref check="valid" refid="ch.6-pt.5" target.guid="_89f29890-11e0-48d3-957e-cf4b610fc40a">pt 5</intref></heading><block><txt break.before="1">In this part—</txt><deflist><definition affected.by.uncommenced="0" guid="_043259ec-cfcc-47a8-a6bf-6efe3ec6c212" id="sec.617A-def.confidentialinformation_"><txt break.before="1"><defterm guid="_011e1217-3a9c-4c81-b316-cc96bb8c59bc" id="sec.617A-def.confidentialinformation" type="definition">confidential information</defterm> means information disclosed to, obtained by, or otherwise held by, a public official under or in relation to this chapter.</txt></definition><definition affected.by.uncommenced="0" guid="_dfb67aae-a33f-49af-a7f6-efe2972dae87" id="sec.617A-def.publicofficial_"><txt break.before="1"><defterm guid="_885708a9-94b6-4d48-b7a5-dc4ce5ac3fdd" id="sec.617A-def.publicofficial" type="definition">public official</defterm> means a person who is, or has been, a public service employee or other person, performing functions under or in relation to the administration or enforcement of this Act.</txt></definition></deflist></block></clause><clause affected.by.uncommenced="0" guid="_89f33504-8cd4-4e10-8a1b-ac0b8127172f" id="sec.617B" provision.type="other" spent.amends="0"><no>617B</no><heading guid="_d3fa0976-1c18-4693-8ab5-5ad2e8d89eba" id="sec.617B-he">Disclosure of confidential information</heading><subclause affected.by.uncommenced="0" guid="_a1e55890-2353-4927-adac-62ae620ab65b" id="sec.617B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A public official must not disclose confidential information acquired by the public official in the public official’s capacity to anyone else other than under this part.</txt></block><penalty guid="_3f71af00-3d46-4051-8864-1de0a43d8edb" id="sec.617B-ssec.1-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_26c01b59-b6a0-4438-b213-371d261f0889" id="sec.617B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister may disclose personal confidential information—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a4bf4e76-be0c-4cb8-8768-91257dab4132" id="sec.617B-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to the person to whom the information relates or, if either of the following apply, to someone else—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_640438e5-5c1c-462a-9615-413fea65c1a6" id="sec.617B-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">with the consent, express or implied, of the person to whom the information relates;</txt></block></li><li guid="_d058e2db-436c-40cb-ac44-244d18d2f6c9" id="sec.617B-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the Minister reasonably believes is acting for the person to whom the information relates; or</txt></block></li></list></block></li><li guid="_8e094475-92e2-46fd-92e3-ddc3846ea1f8" id="sec.617B-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the disclosure is expressly permitted or required under another Act; or</txt></block></li><li guid="_528beb60-c148-4f5c-9687-35312fdbb2f8" id="sec.617B-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">to a person for the administration or enforcement of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_53529c64-58d0-4787-b409-5720bf18d3e9" id="sec.617B-ssec.2-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a royalty law; or</txt></block></li><li guid="_e42ad80b-bfc8-4893-9f3a-f7a8e4a2c524" id="sec.617B-ssec.2-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a tax law or another law administered by the revenue commissioner; or</txt></block></li><li guid="_d2b310ae-6e29-4091-ba9f-7a6eae692229" id="sec.617B-ssec.2-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">another law about public revenue; or</txt></block></li></list></block></li><li guid="_5ec014ab-53a3-42de-8e4b-0fe1e91d9ff0" id="sec.617B-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">in relation to any legal proceeding under this Act; or</txt></block></li><li guid="_02062fed-084a-4169-a5dd-12bb3cf8dc7b" id="sec.617B-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">to an officer of the department for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_90a73517-baf8-4d9a-879a-21a513b371f9" id="sec.617B-ssec.2-para1.e-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">developing or monitoring revenue policies; or</txt></block></li><li guid="_68baf6b9-ddb6-4bff-8841-d2021c494174" id="sec.617B-ssec.2-para1.e-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">administering the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-009" target.version.series="3bbc6476-dce9-45a6-a821-229426b13686" type="act"><name emphasis="yes">Financial Accountability Act 2009</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.21" target.doc.id="act-2009-009" target.guid="_048e57b7-228b-4f69-9d44-af66227bb0e9" target.version.series="3bbc6476-dce9-45a6-a821-229426b13686" type="act">section 21</legref>.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_84f829b1-cdff-4764-895a-d9a6d37f727d" id="sec.617B-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, if the Minister becomes aware, from information obtained or held by the Minister in the course of administering this Act, of a particular offence or suspected offence (whether against this Act or another law), the Minister may disclose confidential information about the offence or suspected offence to a member of the Queensland Police Service or the Australian Federal Police for an investigation or proceeding (including for starting an investigation or proceeding).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_707ea6b0-3388-4e6e-9ed1-28c7a39492f5" id="sec.617B-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Also, the Minister may disclose confidential information, other than personal confidential information, to any person, or for any purpose, the Minister is satisfied is appropriate in the circumstances.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5337b653-a25b-4e58-b94d-31078e330987" id="sec.617B-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">This section does not create a right in any person to be given confidential information.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d4e26f8e-7056-4fcc-8231-4afb6ab27f61" id="sec.617B-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_6dc2a26a-9b63-4aec-ae02-d00fc557d630" id="sec.617B-ssec.6-def.personalconfidentialinformation_"><txt break.before="1"><defterm guid="_7d9b926f-f1ec-4ec0-b4e7-884f0f940fdc" id="sec.617B-ssec.6-def.personalconfidentialinformation" type="definition">personal confidential information</defterm>, for a person, means confidential information that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bcf5825e-b18d-4b3f-ab08-04268c5a1e78" id="sec.617B-ssec.6-def.personalconfidentialinformation-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">identifies, or is likely to identify, the person; or</txt></block></li><li guid="_ca9dbc85-0216-4b24-a289-5579868ee4ff" id="sec.617B-ssec.6-def.personalconfidentialinformation-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">discloses matters about the person’s affairs.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_c2153a6e-662a-49de-ad81-f3100acc9fb6" id="sec.617B-ssec.6-def.revenuecommissioner_"><txt break.before="1"><defterm guid="_5f3e0a42-47e3-4345-96d8-163df22b94f1" id="sec.617B-ssec.6-def.revenuecommissioner" type="definition">revenue commissioner</defterm> means the Commissioner of State Revenue appointed under the <legref check="valid" jurisd="QLD" target.doc.id="act-2001-072" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act"><name emphasis="yes">Taxation Administration Act 2001</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.7" target.doc.id="act-2001-072" target.guid="_101f5728-7719-4f1f-92e2-e9e9b650c81b" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act">section 7</legref><legref check="invalid" jurisd="QLD" type="act">(2)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_5a26e094-0831-4890-ad05-93967b8d82f6" id="sec.617B-ssec.6-def.royaltylaw_"><txt break.before="1"><defterm guid="_4a7a3ae3-0d88-4693-8e87-4e95edab5735" id="sec.617B-ssec.6-def.royaltylaw" type="definition">royalty law</defterm> means this Act or another Act administered by the Minister providing for payment of a royalty.</txt></definition><definition affected.by.uncommenced="0" guid="_c8b6e87a-0093-441a-b4ae-7529592b308a" id="sec.617B-ssec.6-def.taxlaw_"><txt break.before="1"><defterm guid="_eaaf7a8c-5dc5-4c1d-bd54-6683111f3fe6" id="sec.617B-ssec.6-def.taxlaw" type="definition">tax law</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2001-072" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act"><name emphasis="yes">Taxation Administration Act 2001</name></legref>, <legref check="valid" jurisd="QLD" refid="sch.2" target.doc.id="act-2001-072" target.guid="_afc518d8-963a-4e05-bff6-198b98e4ee89" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba" type="act">schedule 2</legref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_ba8bac6d-4c2e-442a-912c-ba64bb383ca9" id="sec.617C" provision.type="other" spent.amends="0"><no>617C</no><heading guid="_dffda209-ad22-4b5e-a70e-8439ad284f83" id="sec.617C-he">Other obligations about disclosure and use of confidential information</heading><subclause affected.by.uncommenced="0" guid="_5eb22fb1-ab1c-4fe8-9734-f282e3645a32" id="sec.617C-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f1a844cb-4efd-43ff-9395-d0724a2b076a" id="sec.617C-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a person knowingly acquires confidential information without lawful authority; or</txt></block></li><li guid="_b32417fc-87cd-4c5b-9aeb-6b2f55b7c057" id="sec.617C-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a person receives confidential information that the person knows, or ought reasonably to know, is confidential information;</txt></block></li></list></block><block><txt break.before="1">the person must not disclose the information to anyone else unless the disclosure is permitted under this part.</txt></block><penalty guid="_7242d72e-94bb-41b4-9c3c-9aebbef612f9" id="sec.617C-ssec.1-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty><note guid="_56c9fd90-a82c-4f19-b26b-3452a711fd20" id="sec.617C-ssec.1-note" type="example"><heading guid="_e7acb095-7c1d-473b-ae5c-1f0da84ab991" id="sec.617C-ssec.1-note-he">Example for <intref check="valid" refid="sec.617C-ssec.1" target.guid="_5eb22fb1-ab1c-4fe8-9734-f282e3645a32">subsection (1)</intref><intref check="valid" refid="sec.617C-ssec.1-para1.a" target.guid="_f1a844cb-4efd-43ff-9395-d0724a2b076a">(a)</intref>—</heading><block><txt break.before="1">A person employed by a contractor engaged by the State to clean the department’s offices reads a document in the Minister’s office containing confidential information.</txt></block></note><note guid="_9f7ade0b-3551-4212-a85a-1d7d63212a10" id="sec.617C-ssec.1-note-oc.2" type="example"><heading guid="_a97e54a8-3c24-43ab-802e-bd54f3de3a6a" id="sec.617C-ssec.1-note-oc.2-he">Example for <intref check="valid" refid="sec.617C-ssec.1" target.guid="_5eb22fb1-ab1c-4fe8-9734-f282e3645a32">subsection (1)</intref><intref check="valid" refid="sec.617C-ssec.1-para1.b" target.guid="_b32417fc-87cd-4c5b-9aeb-6b2f55b7c057">(b)</intref>—</heading><block><txt break.before="1">A person, other than the addressee of a fax, receives the fax that states the information in it is confidential and is intended for the addressee’s purposes only.</txt></block></note><note guid="_566013ba-4c24-49eb-b665-063e52c9d7dd" id="sec.617C-ssec.1-note-oc.3" type="example"><heading guid="_422e355e-5319-40a1-8dd5-1238f42fbe5f" id="sec.617C-ssec.1-note-oc.3-he">Note—</heading><block><txt break.before="1">This provision is an executive liability provision—see <intref check="valid" refid="sec.814" target.guid="_9fa8e8a1-4511-4ac6-b2de-5b287f47ce16">section 814</intref>.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_cd5930d7-80fc-455d-b482-3f562ef26e99" id="sec.617C-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If, under <intref check="valid" refid="sec.617B" target.guid="_89f33504-8cd4-4e10-8a1b-ac0b8127172f">section 617B</intref>, the Minister discloses confidential information to a person, the person may disclose the information—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1e01830b-6e65-4d13-9851-32a44a4437d0" id="sec.617C-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to the extent necessary to enable the person to exercise a power or perform a function conferred on the person under a law for the administration or enforcement of the law; or</txt></block></li><li guid="_e8d78448-d9d0-4b2b-8220-fa8ce1552269" id="sec.617C-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for the purpose for which it was disclosed under the section; or</txt></block></li><li guid="_a2aade9f-eadb-415c-8df9-94fd45e3b9d1" id="sec.617C-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">to anyone else or for any purpose if the information relates to the person.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_81553a89-2834-48cc-8906-a6c9b6a4e465" id="sec.617D" provision.type="other" spent.amends="0"><no>617D</no><heading guid="_7bef1e3b-c8ec-4a97-a411-a65f4b135f25" id="sec.617D-he">Refusal of disclosure of particular information</heading><subclause affected.by.uncommenced="0" guid="_c09f7dbc-51a6-481c-be03-2c6bb4f03d22" id="sec.617D-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person engaged in the administration or enforcement of this Act can not be compelled to disclose to a court or QCAT in a proceeding, or to a party to the proceeding—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0d35eec0-b1ca-4f4f-b4f8-5f864180a1fd" id="sec.617D-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">confidential information; or</txt></block></li><li guid="_dbbaa305-c497-415e-95c7-93f978ba4bb5" id="sec.617D-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether or not the person has received particular confidential information; or</txt></block></li><li guid="_14350b26-0a8a-4834-87a2-c739c9912f85" id="sec.617D-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the identity of the source of particular confidential information.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d66d4ecd-dc1f-4ff0-b58e-c3727fdb1e1b" id="sec.617D-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.617D-ssec.1" target.guid="_c09f7dbc-51a6-481c-be03-2c6bb4f03d22">Subsection (1)</intref> does not apply to a proceeding for the administration or enforcement of this Act.</txt></block></subclause></clause></part></chapter><chapter affected.by.uncommenced="0" guid="_9b02e79a-6409-49bb-b011-85b79f00e39d" id="ch.7"><no>Chapter 7</no><heading guid="_7b480b7f-a4e3-4c0a-be5d-055647d509f5" id="ch.7-he">Fuel gas quality and characteristics for consumers</heading><part affected.by.uncommenced="0" guid="_f2a9aa7f-0385-4c21-881e-29954a84faf9" id="ch.7-pt.1"><no>Part 1</no><heading guid="_fcd7a760-5735-4ba9-9d6a-564782a5fb31" id="ch.7-pt.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_7a37350b-653a-45ad-9ed1-00e5fb25b828" id="sec.618" provision.type="other" spent.amends="0"><no>618</no><heading guid="_fcd17a29-8354-4754-8c70-dd9612f4a777" id="sec.618-he">Application of ch 7</heading><block><txt break.before="1">This chapter applies to the supply of fuel gas only if the gas supplied is for use by consumers of fuel gas.</txt></block></clause><clause affected.by.uncommenced="0" guid="_c36c8bb6-ebaa-41c7-a3d9-2bc5e1596e2d" id="sec.619" provision.type="other" spent.amends="0"><no>619</no><heading guid="_cdadd510-304d-4fe6-98ca-eaace31c1151" id="sec.619-he">Who is a <defterm guid="_478e1ffe-ec7e-4adc-9205-07e005b6d0ed" type="mention">consumer</defterm> of fuel gas</heading><subclause affected.by.uncommenced="0" guid="_0d96df09-b489-4083-9328-dbbf0c28897e" id="sec.619-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A <defterm guid="_90c9be3f-ff4e-49c9-a4b0-4b04958a4fe2" id="sec.619-def.consumer-oc.2" type="definition">consumer</defterm> of fuel gas is a person who—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ef30330a-dabf-4333-9699-6a6c246857ae" id="sec.619-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">consumes, or proposes to consume, fuel gas by way of heating, lighting, motive power or in an industrial process; or</txt></block></li><li guid="_e8cb8f76-b740-46e5-9d82-2fbd6f268fe5" id="sec.619-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">uses, or proposes to use, fuel gas for refrigeration or another process.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_be1b10fa-0fe8-4f9f-a9f2-cbc4cbdb5a8f" id="sec.619-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.619-ssec.1" target.guid="_0d96df09-b489-4083-9328-dbbf0c28897e">Subsection (1)</intref><intref check="valid" refid="sec.619-ssec.1-para1.b" target.guid="_e8cb8f76-b740-46e5-9d82-2fbd6f268fe5">(b)</intref> applies even if the use does not result in the gas being consumed.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_3604ffbf-c93e-4799-b06c-e35634368db1" id="ch.7-pt.2"><no>Part 2</no><heading guid="_4183e5ea-dab6-4f14-9785-a28cd7762d06" id="ch.7-pt.2-he">Quality</heading><division affected.by.uncommenced="0" guid="_a5ece1b3-fddb-49ba-ab09-fadf74e49205" id="ch.7-pt.2-div.1"><no>Division 1</no><heading guid="_cfb4bc73-8994-4820-aceb-fd50d5fcb74d" id="ch.7-pt.2-div.1-he">Quality restrictions</heading><clause affected.by.uncommenced="0" guid="_0135c9b2-4f4d-4d89-99e9-e40b5b62a37e" id="sec.620" provision.type="other" spent.amends="0"><no>620</no><heading guid="_be16be41-5500-49c6-9954-092b9b40f541" id="sec.620-he">Prescribed quality</heading><subclause affected.by.uncommenced="0" guid="_97d48d1e-ce4d-4503-919a-e55e88d2b364" id="sec.620-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A regulation may prescribe a quality for fuel gas to be supplied to consumers (the <defterm guid="_30866969-844f-42a0-a7e1-69a79c77d43e" id="sec.620-def.prescribedquality" type="definition">prescribed quality</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_51236558-73a7-4782-b2e0-ccb10badf4d9" id="sec.620-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The prescribed quality may be for the purity, composition or physical parameters of the gas.</txt><note guid="_3359330f-5dd0-4a2d-a8b9-1667112182ac" id="sec.620-ssec.2-note" type="example"><heading guid="_ffd84263-1c9e-4808-93b5-ca5297f70598" id="sec.620-ssec.2-note-he">Examples of physical parameters—</heading><block><txt break.before="1">specific gravity and heating value</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_ed66b462-49ee-4ff9-9763-fe06935ddb9b" id="sec.621" provision.type="other" spent.amends="0"><no>621</no><heading guid="_da6642ec-c20c-489f-b166-00d4e4877f39" id="sec.621-he">Restrictions on supplying gas not of prescribed quality</heading><subclause affected.by.uncommenced="0" guid="_32e5e3b0-bae7-4d76-9fb0-f694b3fd9a94" id="sec.621-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a person (the <defterm guid="_47a5109d-ce4a-41a4-9ceb-50f4cd3fa947" id="sec.621-def.supplier" type="definition">supplier</defterm>) proposes to supply fuel gas to someone else (the <defterm guid="_8fedcfbf-e57b-4688-b2fe-a05fbd34bf87" id="sec.621-def.recipient" type="definition">recipient</defterm>) if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_58a9f891-7d96-46f2-868c-33e59921aa17" id="sec.621-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the gas is not of the prescribed quality; and</txt></block></li><li guid="_49135c32-acc4-4878-b6eb-e277128cb38d" id="sec.621-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a gas quality approval for the gas is not in force.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0592e9c8-e90b-41fe-9eb0-33dace78ca6d" id="sec.621-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The supplier must not supply the fuel gas to the recipient, unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_55a98ac8-adec-4e7c-840e-e16534326c42" id="sec.621-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the recipient has agreed in writing to the supply; and</txt></block></li><li guid="_15e00dde-ae95-4535-8b58-53300e5ed8db" id="sec.621-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the agreement—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5864fc49-a983-4de8-be41-4f8a3ca4cbd7" id="sec.621-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">states that the gas is not of the prescribed quality; and</txt></block></li><li guid="_a47bde57-ee8a-4809-8523-6dee1fe6bc40" id="sec.621-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">describes the quality of the gas; and</txt></block></li></list></block></li><li guid="_e0cc37f6-de48-40a0-861e-b2d54f44e73d" id="sec.621-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the chief inspector has received the agreement, or a copy of it.</txt></block></li></list></block><penalty guid="_0eab30a6-fd72-4bfa-8de1-477cbcc2b80a" id="sec.621-ssec.2-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty><note guid="_c4d7fec4-5795-4c95-8238-4bdb0d98e5ed" id="sec.621-ssec.2-note" type="example"><heading guid="_f10b8064-15bc-4291-addb-54ae3bf0419d" id="sec.621-ssec.2-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_73a820f0-8407-46b4-b7bc-9f9d9d64e046" id="sec.621-ssec.2-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">See however <intref check="valid" refid="sec.437" target.guid="_a5b1a3ba-296f-4847-8caa-7dcba24c0c5c">section 437</intref>.</txt></block></li><li guid="_8e968251-a943-4e7d-abd9-4d206d6f52ca" id="sec.621-ssec.2-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></li></list></block></note></subclause><subclause affected.by.uncommenced="0" guid="_850a346e-e1f8-46cd-9f4e-86300a9a6bf8" id="sec.621-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">An agreement that complies with <intref check="valid" refid="sec.621-ssec.2" target.guid="_0592e9c8-e90b-41fe-9eb0-33dace78ca6d">subsection (2)</intref><intref check="valid" refid="sec.621-ssec.2-para1.a" target.guid="_55a98ac8-adec-4e7c-840e-e16534326c42">(a)</intref> to <intref check="valid" refid="sec.621-ssec.2-para1.c" target.guid="_e0cc37f6-de48-40a0-861e-b2d54f44e73d">(c)</intref> is a <defterm guid="_803ac31f-fc9a-48ad-8bcc-57fbe543166a" id="sec.621-def.gasqualityagreement" type="definition">gas quality agreement</defterm>.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_0ddf85b6-fbf8-4d19-a0b8-966eab8d88e8" id="ch.7-pt.2-div.2"><no>Division 2</no><heading guid="_e7286083-0226-4cfb-8d5d-99e9d236544a" id="ch.7-pt.2-div.2-he">Gas quality approvals</heading><clause affected.by.uncommenced="0" guid="_f61e22bc-82ff-463d-b3ee-a75d9d0acbd2" id="sec.622" provision.type="other" spent.amends="0"><no>622</no><heading guid="_848796b0-2ed9-4242-a5d0-61773d23f2fc" id="sec.622-he">Chief inspector’s power to approve quality</heading><subclause affected.by.uncommenced="0" guid="_6121dc50-3485-4154-963c-321904e823bc" id="sec.622-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief inspector may, on the chief inspector’s own initiative or on application, approve the quality of fuel gas (a <defterm guid="_0ded08af-499d-431c-82e0-4a9351990a88" id="sec.622-def.gasqualityapproval" type="definition">gas quality approval</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d2fc0991-c540-4fac-98e6-cae2428ed717" id="sec.622-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application must be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e5bb7485-319f-44af-8372-22ab648c8c74" id="sec.622-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in the approved form; and</txt></block></li><li guid="_71f0b787-f525-4c1b-a08c-895c89a073be" id="sec.622-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">accompanied by the fee prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_68a19e24-5332-4dfd-a595-b2e2f8a72c2c" id="sec.622-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A gas quality approval may be given for all or any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c693155b-aebf-4d08-a281-c74082f5678b" id="sec.622-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">supply by a stated person;</txt></block></li><li guid="_0c274b14-9f43-4605-a934-c7d4674e2d5c" id="sec.622-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a stated period;</txt></block></li><li guid="_1c2674fe-2b7e-414c-b73f-8cf2276c6609" id="sec.622-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">supply to a stated consumer, or group of consumers, from a common source.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e39ee82a-cc2a-44af-8e5b-b69404715915" id="sec.623" provision.type="other" spent.amends="0"><no>623</no><heading guid="_75554399-d60e-476b-bbcf-4e7ac840d87b" id="sec.623-he">Criteria for approval</heading><block><txt break.before="1">The chief inspector may issue a gas quality approval only if satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_28958cb1-7f9f-4725-b27c-8a959dcac6b4" id="sec.623-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the quality of the gas is acceptable for supply to the relevant consumers; and</txt></block></li><li guid="_764b8227-041b-4c63-bf2e-e854ebe687c7" id="sec.623-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">either—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f49ff3fb-bb72-4acf-952b-0d87a8c16b2f" id="sec.623-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the approval is necessary to ensure sufficiency of gas supply to the relevant consumers; or</txt></block></li><li guid="_678a83ae-54cd-4bdf-8962-599d7aea36d1" id="sec.623-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">that stopping the supply to allow gas of the prescribed quality to be supplied is impractical or may cause a dangerous situation; or</txt></block></li><li guid="_540bec3c-6b29-4aab-a6a2-14f5af73938a" id="sec.623-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">it is impractical to seek the written approval of the relevant consumers to be supplied with gas of that quality.</txt></block></li></list></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_ccf8defa-872e-40f3-8cfa-ef67963ad2c6" id="sec.624" provision.type="other" spent.amends="0"><no>624</no><heading guid="_8d8c1710-c33b-4f94-87f5-9c1f9da566ba" id="sec.624-he">Steps after making decision about approval</heading><subclause affected.by.uncommenced="0" guid="_e56cfee4-4a6c-4276-8a29-6b4a5a683807" id="sec.624-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the chief inspector issues a gas quality approval for supply by a person, the chief inspector must give the person notice of the approval.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_345bda67-27ca-4e08-a542-cb651290a263" id="sec.624-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The gas quality approval takes effect when the notice is given.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d9bd92b8-9502-43c1-99d9-bc406d054182" id="sec.624-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">On refusal to issue a gas quality approval, the holder must be given an information notice about the decision to refuse.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_dd829dea-98e4-4451-ae37-7c14103b8724" id="sec.625" provision.type="other" spent.amends="0"><no>625</no><heading guid="_d46bd6cd-ca98-414b-b839-10dd847074e6" id="sec.625-he">Power to cancel approval</heading><subclause affected.by.uncommenced="0" guid="_4b497736-9540-47d1-bbdc-ae9b1725770f" id="sec.625-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief inspector may decide to immediately cancel a gas quality approval if the chief inspector reasonably believes there may be an unacceptable risk to safety if the approval were to continue in force.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7d858454-1300-4d43-9e65-51e15c5e1e88" id="sec.625-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A cancellation under <intref check="valid" refid="sec.625-ssec.1" target.guid="_4b497736-9540-47d1-bbdc-ae9b1725770f">subsection (1)</intref> takes effect when the gas quality approval holder is given an information notice about the decision to cancel.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d5c994b2-5df8-4948-ad08-bdc3e580f0f1" id="sec.625-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief inspector may, by complying with <intref check="valid" refid="sec.625-ssec.4" target.guid="_fec2d43b-6451-4e98-ab85-b66310e1a39b">subsections (4)</intref> and <intref check="valid" refid="sec.625-ssec.5" target.guid="_b3c8c210-a336-4cd5-8610-b1b05db29bf6">(5)</intref>, decide to cancel a gas quality approval for any other reason.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fec2d43b-6451-4e98-ab85-b66310e1a39b" id="sec.625-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the chief inspector proposes to cancel a gas quality approval under <intref check="valid" refid="sec.625-ssec.3" target.guid="_d5c994b2-5df8-4948-ad08-bdc3e580f0f1">subsection (3)</intref>, the chief inspector must give its holder a notice stating—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_de926c14-7d10-4120-bd8e-3e74ff992ca2" id="sec.625-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that the chief inspector proposes to cancel the approval; and</txt></block></li><li guid="_fafe541c-7ddf-46df-abb2-fabefbf4d0ef" id="sec.625-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the reasons for the proposed cancellation; and</txt></block></li><li guid="_4987df66-3740-4dbc-a42a-1127f733bb9c" id="sec.625-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that the holder may lodge, within a stated reasonable period, written submissions about the proposed cancellation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b3c8c210-a336-4cd5-8610-b1b05db29bf6" id="sec.625-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The chief inspector must, before making a decision under <intref check="valid" refid="sec.625-ssec.3" target.guid="_d5c994b2-5df8-4948-ad08-bdc3e580f0f1">subsection (3)</intref>, consider any written submissions lodged by the holder within the stated period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_dd750ebb-a730-4bb1-bc99-08b2207b7a98" id="sec.625-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">A decision to cancel under <intref check="valid" refid="sec.625-ssec.3" target.guid="_d5c994b2-5df8-4948-ad08-bdc3e580f0f1">subsection (3)</intref> takes effect when the holder is given an information notice about the decision or, if the notice states a later day of effect, on that later day.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_7bb4e7d1-9180-4e1b-bb5e-f43612cc9aa8" id="ch.7-pt.3"><no>Part 3</no><heading guid="_c47dded7-be63-47b3-8b41-3011626b775a" id="ch.7-pt.3-he">Characteristics</heading><clause affected.by.uncommenced="0" guid="_f2a9e253-a661-418b-86e7-3b6512a0a921" id="sec.626" provision.type="other" spent.amends="0"><no>626</no><heading guid="_75b73af9-2ed4-428d-955e-ed50827fdc3c" id="sec.626-he">Fuel gas supplied through pipeline</heading><subclause affected.by.uncommenced="0" guid="_5439e4fb-9511-4b03-b775-b7bcb0157ef2" id="sec.626-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person who supplies fuel gas must ensure the gas is reasonably free of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d85c2bd5-8d33-408c-92fc-b8dd840ac9d7" id="sec.626-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">any liquids; or</txt></block></li><li guid="_c29b70f1-f48e-4011-a46b-49c72e86282b" id="sec.626-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">substances that are toxic to persons or corrosive to pipelines, gas systems or gas containers.</txt></block></li></list></block><penalty guid="_c5b43475-009b-454a-af07-c72f3c65e0c2" id="sec.626-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty><note guid="_32f86eea-bdad-46df-949d-b85d7eb302ec" id="sec.626-ssec.1-note" type="example"><heading guid="_2198d80f-c822-45f6-b72c-6bc3a8ac86f4" id="sec.626-ssec.1-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_f4e7bcf7-3dfb-4496-8018-82a48169302b" id="sec.626-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.626-ssec.1" target.guid="_5439e4fb-9511-4b03-b775-b7bcb0157ef2">subsection (1)</intref>, fuel gas is taken to be reasonably free of liquids or substances mentioned in <intref check="valid" refid="sec.626-ssec.1" target.guid="_5439e4fb-9511-4b03-b775-b7bcb0157ef2">subsection (1)</intref><intref check="valid" refid="sec.626-ssec.1-para1.b" target.guid="_c29b70f1-f48e-4011-a46b-49c72e86282b">(b)</intref> if they are no more than any level declared under a safety requirement.</txt><note guid="_2a695b56-fb65-4c32-b972-72a87d427997" id="sec.626-ssec.2-note" type="example"><heading guid="_3da69874-92c9-4548-9917-9b18dedea584" id="sec.626-ssec.2-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="sec.669" target.guid="_6b7220f7-5c5d-49d9-8891-f3cd753d86b9">section 669</intref> (Making safety requirement).</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_01b77b3f-adce-4236-9e34-75ba48b9dda1" id="sec.626-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In making the declaration, regard must be had to current industry practice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5683732d-3d47-4825-8c7e-eb0e0910323d" id="sec.626-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0"><intref check="valid" refid="sec.626-ssec.1" target.guid="_5439e4fb-9511-4b03-b775-b7bcb0157ef2">Subsection (1)</intref> applies even if the gas is of the prescribed quality or of a quality approved under a gas quality approval or provided for under a gas quality agreement.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_04e7c072-d69e-4555-8ee8-f33911d27b6d" id="sec.627" provision.type="other" spent.amends="0"><no>627</no><heading guid="_4ec270d3-3483-4e00-b851-01fef8fa63a1" id="sec.627-he">Prescribed odour</heading><block><txt break.before="1">A regulation may prescribe a distinctive odour for fuel gas (the <defterm guid="_fbaa0e88-68ba-4b1e-986f-b6940dea8e97" id="def.prescribedodour" type="definition">prescribed odour</defterm>) to be supplied for consumer use.</txt></block></clause><clause affected.by.uncommenced="0" guid="_a9123117-fe35-41d1-af6b-85de042a0cf9" id="sec.628" provision.type="other" spent.amends="0"><no>628</no><heading guid="_61dd09ab-3d07-4498-8848-98e234f8fb68" id="sec.628-he">Odour requirement</heading><subclause affected.by.uncommenced="0" guid="_fcd6c26b-fab5-48d2-a513-ab62da8a96a0" id="sec.628-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not supply fuel gas to a consumer unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e0bab183-fef3-45f7-9fcd-df95dcf25856" id="sec.628-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the gas has the prescribed odour; or</txt></block></li><li guid="_1c1a92a1-615e-4e69-a60b-87a16eb2d909" id="sec.628-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the supply is to an industrial installation with appropriate gas detectors and shut-down systems and a risk analysis has been carried out by an appropriately qualified person showing the supply is safe.</txt></block></li></list></block><penalty guid="_22e76109-6641-4154-aa30-000b50491b54" id="sec.628-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty><note guid="_33947319-1673-4516-9584-dc564c34346f" id="sec.628-ssec.1-note" type="example"><heading guid="_f7a48263-0f7a-438b-842b-d05f20a895c3" id="sec.628-ssec.1-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_ca8a09dd-8ef2-48f8-969f-267076a3162c" id="sec.628-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The fact that a person is supplying a consumer with fuel gas under <intref check="valid" refid="sec.628-ssec.1" target.guid="_fcd6c26b-fab5-48d2-a513-ab62da8a96a0">subsection (1)</intref><intref check="valid" refid="sec.628-ssec.1-para1.b" target.guid="_1c1a92a1-615e-4e69-a60b-87a16eb2d909">(b)</intref> does not limit an inspector’s power to give the person a dangerous situation direction that requires the gas to have the prescribed odour.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_086164ae-c858-4e5c-911c-712be2338a6c" id="sec.628-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_3c2f20b1-72cd-49bc-b590-a922150d3e06" id="sec.628-ssec.3-def.appropriatelyqualifiedperson_"><txt break.before="1"><defterm guid="_caf67140-c092-4f60-978f-ba5e17ef5fa5" id="sec.628-ssec.3-def.appropriatelyqualifiedperson" type="definition">appropriately qualified person</defterm> means a person who—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3611704a-8d15-4830-a2b9-20e7bebf813a" id="sec.628-ssec.3-def.appropriatelyqualifiedperson-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is independent of the person supplying the fuel gas; and</txt></block></li><li guid="_5ba44fc1-5202-44eb-b494-ce2a7f5c4317" id="sec.628-ssec.3-def.appropriatelyqualifiedperson-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the chief inspector considers—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6a10151f-60df-4ce0-95eb-98dfdde58691" id="sec.628-ssec.3-def.appropriatelyqualifiedperson-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">is appropriately qualified; and</txt></block></li><li guid="_3174347b-3f38-4e79-870a-421cd28d9d23" id="sec.628-ssec.3-def.appropriatelyqualifiedperson-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">has access to information to carry out the risk analysis.</txt></block></li></list></block></li></list></definition></deflist></block></subclause></clause></part></chapter><chapter affected.by.uncommenced="0" guid="_6a18d1e2-5229-45b6-aa25-5092246a8601" id="ch.8"><no>Chapter 8</no><heading guid="_127243b5-d961-4919-ac8f-df380a90d5bf" id="ch.8-he">Petroleum and fuel gas measurement</heading><part affected.by.uncommenced="0" guid="_6ea073e6-3653-4d55-a35f-c069838a08e7" id="ch.8-pt.1"><no>Part 1</no><heading guid="_be86703a-eff1-4ba2-8c13-22cf4f4eb6b2" id="ch.8-pt.1-he">Introduction</heading><division affected.by.uncommenced="0" guid="_e986414c-0bea-41b4-8f30-d2ee7db09b16" id="ch.8-pt.1-div.1"><no>Division 1</no><heading guid="_9bf72fb3-21ae-4db1-b74b-4c1152b23f45" id="ch.8-pt.1-div.1-he">Application of <intref check="valid" refid="ch.8" target.guid="_6a18d1e2-5229-45b6-aa25-5092246a8601">chapter 8</intref></heading><clause affected.by.uncommenced="0" guid="_94354287-f146-489b-90c7-d3a916870248" id="sec.629" provision.type="other" spent.amends="0"><no>629</no><heading guid="_94b01960-d790-44f5-ad05-a6f72d911cbf" id="sec.629-he">Application of ch 8</heading><block><txt break.before="1">This chapter applies for meters used to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_06db173c-744a-4d4b-912d-5f37d5491d84" id="sec.629-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">measure, at custody transfer points, petroleum or fuel gas for supply or transport by pipeline; or</txt></block></li><li guid="_32b3338a-aa49-4dfe-9d3a-81889577545e" id="sec.629-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">work out the petroleum royalty; or</txt></block></li><li guid="_d8abbc0d-690d-4506-99af-04c51d0c5cc4" id="sec.629-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">comply with <intref check="valid" refid="sec.801" target.guid="_6acf7b1c-5dcf-471f-a0b7-d8a03ff6052a">section 801</intref>.</txt></block></li></list><note guid="_77da5679-f8c9-4f70-a49f-1828012c1270" id="sec.629-note" type="example"><heading guid="_277a7538-42e4-452e-86a2-e530da6c046f" id="sec.629-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_8993583b-77ac-44d2-b0d4-b1d30a3931d3" id="sec.629-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">Under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.318CU" target.doc.id="act-1989-110" target.guid="_838677d8-5e50-44f3-985e-f6f950a25b34" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 318CU</legref>, this part and <intref check="valid" refid="ch.8-pt.2" target.guid="_cd2436ef-9c1e-453c-84b4-86a62b9d63a0">part 2</intref> also apply for the measurement and recording of incidental coal seam gas mined in the area of a coal or oil shale mining lease.</txt></block></li><li guid="_38b78a7a-a690-4557-a1c4-499ef5a59103" id="sec.629-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">The <legref check="invalid" jurisd="CTH" type="act"><name emphasis="yes">National Measurement Act 1960</name> (Cwlth)</legref> also imposes requirements that apply for measurements schemes under this chapter.</txt></block></li></list></block></note></block></clause></division><division affected.by.uncommenced="0" guid="_30ac9d6a-04c0-45c8-bbd4-902f080819ab" id="ch.8-pt.1-div.2"><no>Division 2</no><heading guid="_e3d0b160-2a05-48c0-b2b3-865675ca6866" id="ch.8-pt.1-div.2-he">Interpretation</heading><clause affected.by.uncommenced="0" guid="_738c16a7-1f0b-4542-8188-ae0cd37dc7ab" id="sec.631" provision.type="other" spent.amends="0"><no>631</no><heading guid="_44905d64-c6de-44ca-a9e6-ed12ebfeb0d1" id="sec.631-he">What is a <defterm guid="_852d9448-daaf-4ef6-9c61-89f0f0839055" type="mention">meter</defterm></heading><subclause affected.by.uncommenced="0" guid="_9cbd1d0c-37aa-4f29-8290-098e28c6f3a5" id="sec.631-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A <defterm guid="_15f20e04-b1d4-47f9-85c8-fbb341857244" id="sec.631-def.meter-oc.2" type="definition">meter</defterm> is a device used to work out, by direct measurement, the energy, mass or volume of petroleum or fuel gas transferred from one place to another.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0fc06993-d1ed-49bc-a376-a573cfc30490" id="sec.631-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A <defterm guid="_fa3858c4-a97a-4ef6-a11f-d9d642d6c062" id="sec.631-def.meter-oc.3" type="definition">meter</defterm> includes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e2c89be8-03a6-405f-a459-306b0c34cf54" id="sec.631-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a measuring device and its ancillary equipment; and</txt><note guid="_2969dd26-7dc4-4f5f-89ac-9662f97e032f" id="sec.631-ssec.2-para1.a-note" type="example"><heading guid="_d52cd1bc-4319-4cb7-bf4a-31a1640381b5" id="sec.631-ssec.2-para1.a-note-he">Examples of a measuring device—</heading><block><txt break.before="1">a positive displacement meter, turbine meter and orifice metering</txt></block></note><note guid="_0ab80842-ddcf-4315-b50e-bb76305c7a3b" id="sec.631-ssec.2-para1.a-note-oc.2" type="example"><heading guid="_68cfef1c-7b76-4cc1-aafb-a27080c79e62" id="sec.631-ssec.2-para1.a-note-oc.2-he">Example of ancillary equipment—</heading><block><txt break.before="1">a flow computer</txt></block></note></block></li><li guid="_99a02b01-7ea7-4183-b6bb-294dd6d51394" id="sec.631-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a measurement method.</txt><note guid="_db6f873c-4af1-4f7d-89a0-424082f7f223" id="sec.631-ssec.2-para1.b-note" type="example"><heading guid="_08f554a6-9443-4e30-9ca0-e70dbb236674" id="sec.631-ssec.2-para1.b-note-he">Examples of measurement methods—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_416d951d-5da7-4ae5-80d2-963c5242f1db" id="sec.631-ssec.2-para1.b-note-para2.1" provision.type="other"><no>1</no><block><txt break.before="0">calibrated weighbridge differences</txt></block></li><li guid="_612247a7-272d-4c34-b3ee-94986d706d7d" id="sec.631-ssec.2-para1.b-note-para2.2" provision.type="other"><no>2</no><block><txt break.before="0">tank dip readings</txt></block></li><li guid="_2f18ee71-2ae2-4705-8d76-ed3837a86765" id="sec.631-ssec.2-para1.b-note-para2.3" provision.type="other"><no>3</no><block><txt break.before="0">for disposal of incidental coal seam gas in ventilation air from an underground coal mine, estimation of flow rates and sampling of methane content measurements</txt></block></li></list></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9230b721-4d48-458d-84b5-b6ff7e659718" id="sec.631-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A reference to a <defterm guid="_033d6e30-ff30-4dab-9dab-ab1613b39fbf" id="sec.631-def.meter-oc.4" type="definition">meter</defterm> includes a part of the meter.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_681e405b-7ac3-4e4c-b528-5f93db61c35e" id="sec.632" provision.type="other" spent.amends="0"><no>632</no><heading guid="_d57111b0-93d5-49b3-a3ad-3afe5510b119" id="sec.632-he">Who is the <defterm guid="_c70c849b-0468-46d4-93a1-7dea50b15e3b" type="mention">controller</defterm> of a meter</heading><subclause affected.by.uncommenced="0" guid="_c1cc2209-d0a0-400f-8130-8cbcb17ca1cd" id="sec.632-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The <defterm guid="_c177ea6e-36b0-48a5-bad3-7340d48cebb9" id="sec.632-def.controller-oc.2" type="definition">controller</defterm>, of a meter, is the person who owns the meter.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6de87440-c9e4-4cd0-975d-a3120967c34f" id="sec.632-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if the owner has arranged with someone else for the other person to operate and maintain the meter for measurement purposes, the other person is the <defterm guid="_e459ff08-9b1b-4c64-b9a2-f894523e32f0" id="sec.632-def.controller-oc.3" type="definition">controller</defterm> of the meter while the arrangement is in force.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1a1d3f82-ff98-4b33-bdc5-40c10c4a0293" id="sec.633" provision.type="other" spent.amends="0"><no>633</no><heading guid="_4a5101bd-b92d-4838-bdba-ba6aa7325683" id="sec.633-he">What is the <defterm guid="_287c93db-5623-44a7-b587-dfb9d9facf53" type="mention">measurement scheme</defterm> for a meter</heading><block><txt break.before="1">The <defterm guid="_d778fcb5-9535-4a67-ad4a-d7adfad80b16" id="def.measurementscheme" type="definition">measurement scheme</defterm>, for a meter, is the measurement scheme for the meter made under <intref check="valid" refid="sec.637" target.guid="_de7f30f4-0eb3-47e7-98b1-f51b78db6ae8">section 637</intref>, as revised from time to time under <intref check="valid" refid="sec.639" target.guid="_c691cdfd-1dee-42a9-a295-4df6447adbc1">section 639</intref>.</txt></block></clause><clause affected.by.uncommenced="0" guid="_94a59e99-adf0-4597-a399-fdcbb1372799" id="sec.634" provision.type="other" spent.amends="0"><no>634</no><heading guid="_3b5035cf-c14e-4a61-9542-ddd146d630cb" id="sec.634-he"><defterm guid="_d52b5bdd-7f1c-46d4-bc2d-a58e64a556b7" type="mention">Measurement</defterm> includes estimation</heading><block><txt break.before="1">A reference to the <defterm guid="_03eb9ed1-36b4-412e-883d-a523b1f5244c" id="def.measurement" type="definition">measurement</defterm>, of petroleum or fuel gas, includes an estimation of the energy, mass or volume of the petroleum or fuel gas.</txt></block></clause><clause affected.by.uncommenced="0" guid="_494a27eb-c711-4316-a20d-31803239c1d5" id="sec.635" provision.type="other" spent.amends="0"><no>635</no><heading guid="_944e050d-74e5-409e-8c9d-a67201d2f9d3" id="sec.635-he">What is the <defterm guid="_7c101e5a-f942-45af-858b-817c183d91e6" type="mention">tolerance for error</defterm> for a meter</heading><block><txt break.before="1">The <defterm guid="_25372795-cde0-4b81-bc48-f07f480be625" id="def.toleranceforerror" type="definition">tolerance for error</defterm>, for a meter, is its tolerance for error in accuracy—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a9380c5a-946d-477c-b021-3495ae259736" id="sec.635-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">as prescribed under a regulation; or</txt></block></li><li guid="_05bf1c8e-c5ad-4f9b-8ae8-3a43cfe9d7e9" id="sec.635-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the tolerance is not prescribed under a regulation, as provided for under—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f156ab52-a60b-477b-a966-f28a355b81de" id="sec.635-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the measurement scheme for the meter; or</txt></block></li><li guid="_137b1e7f-be73-4146-80ef-f2c0657fff37" id="sec.635-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">an Australian standard or similar standard that the measurement scheme for the meter requires the meter to comply with.</txt></block></li></list></block></li></list></block></clause></division></part><part affected.by.uncommenced="0" guid="_cd2436ef-9c1e-453c-84b4-86a62b9d63a0" id="ch.8-pt.2"><no>Part 2</no><heading guid="_232b961a-2925-40ae-a1f6-86042544a6ad" id="ch.8-pt.2-he">Measurement schemes</heading><division affected.by.uncommenced="0" guid="_d5fe8fd4-5471-409f-860c-81804f2a165d" id="ch.8-pt.2-div.1"><no>Division 1</no><heading guid="_d4b8b6bc-626d-4d9e-8392-1fe1e58aa676" id="ch.8-pt.2-div.1-he">Making and revision of measurement scheme</heading><clause affected.by.uncommenced="0" guid="_7fc3dadf-52c7-4bc4-9ad4-9d2ea67a9f45" id="sec.636" provision.type="other" spent.amends="0"><no>636</no><heading guid="_da277160-8829-4c4f-8652-45fd2ca8b7da" id="sec.636-he">Obligations of controller of meter</heading><block><txt break.before="1">The controller of a meter must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3e121850-766e-4a51-b18f-a52b1db356dc" id="sec.636-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">make a measurement scheme for the meter that complies with <intref check="valid" refid="sec.637" target.guid="_de7f30f4-0eb3-47e7-98b1-f51b78db6ae8">section 637</intref>; and</txt></block></li><li guid="_44c67b0b-bb97-4448-b6e0-4a5e35eec409" id="sec.636-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">implement and maintain the scheme.</txt></block></li></list><note guid="_52f33627-69f5-40ef-9d7b-5a61c3533f7f" id="sec.636-note" type="example"><heading guid="_52bc25a1-a6ab-46a6-9550-ad4cbcab3299" id="sec.636-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.801" target.guid="_6acf7b1c-5dcf-471f-a0b7-d8a03ff6052a">section 801</intref> (Petroleum producer’s measurement obligations).</txt></block></note></block><penalty guid="_c591dcdf-1c43-495d-b75e-01cd6ecb6208" id="sec.636-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></clause><clause affected.by.uncommenced="0" guid="_de7f30f4-0eb3-47e7-98b1-f51b78db6ae8" id="sec.637" provision.type="other" spent.amends="0"><no>637</no><heading guid="_46a11787-de45-46ac-916b-f78f74c0175f" id="sec.637-he">Content requirements for measurement schemes</heading><subclause affected.by.uncommenced="0" guid="_53036442-cb9c-4d02-9366-c98d50d633da" id="sec.637-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A measurement scheme for a meter must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d2d52cf9-b29c-450c-83f8-8b903487acf9" id="sec.637-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">identify each meter, or meter family or type, to which the scheme applies; and</txt></block></li><li guid="_d294bd7d-2c2b-4069-a708-dade2c80b486" id="sec.637-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the scheme applies to a meter family or type—state approximately how many meters to which the scheme applies are in each family or type; and</txt></block></li><li guid="_94a00a5d-1a0f-4fc7-87af-fe113c7113ed" id="sec.637-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">state an Australian standard or other standard acceptable to the chief executive to which each meter to which the scheme applies must comply; and</txt></block></li><li guid="_058e2590-f32c-43de-86bc-961052293827" id="sec.637-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">if the standard does not provide for, or a regulation does not prescribe, when any of the meters must be replaced or tested—state a proposed time or interval for replacement or testing; and</txt></block></li><li guid="_b745a474-dbd6-405a-bcdd-918bef9a88c6" id="sec.637-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">if the standard does not state, or a regulation does not prescribe, a tolerance for error for any of the meters—state what is the tolerance for error for the meters or meters of their family or type; and</txt></block></li><li guid="_4dce26f8-e72c-4d98-9f8f-9bdd426f8b7c" id="sec.637-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">provide for regular reviews of the scheme; and</txt></block></li><li guid="_0f940630-105c-461d-9507-9831bc492d1c" id="sec.637-ssec.1-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">state key performance indicators to be used to monitor compliance with the scheme and this chapter; and</txt></block></li><li guid="_8d891c16-c6fb-4221-b042-16d8356b2073" id="sec.637-ssec.1-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">include any competency requirement made under <intref check="valid" refid="sec.638" target.guid="_b0ea8d55-bb43-4015-904d-ac2fac452d13">section 638</intref>; and</txt></block></li><li guid="_79546616-489a-4a39-ad3a-2e6341ed28c1" id="sec.637-ssec.1-para1.i" provision.type="other"><no>(i)</no><block><txt break.before="0">comply with any relevant requirements under the <legref check="invalid" jurisd="CTH" type="act"><name emphasis="yes">National Measurement Act 1960</name> (Cwlth)</legref>; and</txt></block></li><li guid="_d6536fed-6d13-41b2-9194-44bddc729f25" id="sec.637-ssec.1-para1.j" provision.type="other"><no>(j)</no><block><txt break.before="0">state the means of compliance with other relevant matters prescribed under a regulation; and</txt></block></li><li guid="_638e4f42-25e1-4a5e-8d42-1eaf14b692f0" id="sec.637-ssec.1-para1.k" provision.type="other"><no>(k)</no><block><txt break.before="0">state other matters prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_895ceea3-45c1-4fd4-b3e3-460d735b3049" id="sec.637-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The scheme must also address the following to the extent they are appropriate for the meters to which the scheme applies—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_15a0e791-0a6b-4402-a47b-333b7d79d944" id="sec.637-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">installation and commissioning of meters;</txt></block></li><li guid="_e04d112f-8021-4d97-826b-3d1e16925fb6" id="sec.637-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">meter testing methods and frequency;</txt></block></li><li guid="_49d5c715-4d87-4cde-be0c-5e923d27a931" id="sec.637-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">maintenance processes;</txt></block></li><li guid="_3bd25b34-8c47-45df-985e-2364cf973bc6" id="sec.637-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">correction factor calculation;</txt></block></li><li guid="_81a48b45-b93f-4eeb-b84b-c9986a44b4e8" id="sec.637-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">calibration and traceability of meter test equipment;</txt></block></li><li guid="_663a3422-0202-4659-a252-1b1c5113dc83" id="sec.637-ssec.2-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">meter security, including, for example, protection from damage during transport, installation and use and preventing unauthorised alteration of meter readings;</txt></block></li><li guid="_18973788-6bfa-4931-bb7b-00d3ae3848b7" id="sec.637-ssec.2-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">processes for estimated meter readings, reasons for estimations and procedures for reconciling actual and estimated readings;</txt></block></li><li guid="_bca0ea9e-bdba-428a-aa82-53d0d917c3b1" id="sec.637-ssec.2-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">procedures on meter failure, incorrect operation or meter bypass;</txt></block></li><li guid="_73cbd823-7ae6-4953-82e5-01771fba5a6a" id="sec.637-ssec.2-para1.i" provision.type="other"><no>(i)</no><block><txt break.before="0">levels of competency for persons employed or engaged to carry out measurement activities under the scheme or other activities relating to the meters;</txt><note guid="_19f3d584-b995-47cb-99a4-f9c3f962d4f1" id="sec.637-ssec.2-para1.i-note" type="example"><heading guid="_9bf22dc0-9f25-4141-b127-2defeda480b8" id="sec.637-ssec.2-para1.i-note-he">Examples of other activities—</heading><block><txt break.before="1">removing and replacing the meters</txt></block></note></block></li><li guid="_500e2d2b-c633-470c-bc70-8f0437e2b80f" id="sec.637-ssec.2-para1.j" provision.type="other"><no>(j)</no><block><txt break.before="0">training programs to maintain the skill levels of persons mentioned in <intref check="valid" refid="sec.637-ssec.2-para1.i" target.guid="_73cbd823-7ae6-4953-82e5-01771fba5a6a">paragraph (i)</intref>;</txt></block></li><li guid="_0ef5e24b-299b-4b7d-a49b-ada2c0a59a2f" id="sec.637-ssec.2-para1.k" provision.type="other"><no>(k)</no><block><txt break.before="0">records to be kept, including, for example, records of anomalies, complaints and action taken to rectify or account for them, and the minimum period they will be kept.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e0896681-4990-41ed-a376-89cb95893f8a" id="sec.637-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_9ee670c8-d92a-4e2d-bd31-aa03fbbaef62" id="sec.637-ssec.3-def.meterfamily_"><txt break.before="1"><defterm guid="_1a3900de-09ac-4e24-8817-b344eb112f8c" id="sec.637-ssec.3-def.meterfamily" type="definition">meter family</defterm> means a group of meters if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a241a50d-c286-44f5-b962-ba79390f3e37" id="sec.637-ssec.3-def.meterfamily-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">all the meters have been made to the same specifications by the same manufacturer; and</txt></block></li><li guid="_4d2999c0-554d-455a-9203-0c1656c9f616" id="sec.637-ssec.3-def.meterfamily-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">there are no significant differences in components or materials between meters.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b0ea8d55-bb43-4015-904d-ac2fac452d13" id="sec.638" provision.type="other" spent.amends="0"><no>638</no><heading guid="_84f2332a-927d-45d6-8a88-13e9402cbd50" id="sec.638-he">Power to fix competency required under measurement scheme</heading><subclause affected.by.uncommenced="0" guid="_8dde6ab1-f944-4c21-abf8-bc4a076bd73c" id="sec.638-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the chief executive believes an activity under a measurement scheme for a meter should be performed only by a person with a particular competency.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_47a9b5df-00b0-4b59-be62-06079a13153f" id="sec.638-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may, by notice to the controller of the relevant meter, require the task be performed only by a person with the competency.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_cc415435-a221-43b0-bf94-7a12baaefca4" id="sec.638-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">On the giving of the notice, the controller must ensure—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c4b98e9f-2f43-4b90-8813-3e77705b4a05" id="sec.638-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the task is performed only by a person with the competency; and</txt></block></li><li guid="_5421ea4d-d728-43b1-a48c-63db9071aa21" id="sec.638-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the scheme is amended to incorporate the requirement.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c691cdfd-1dee-42a9-a295-4df6447adbc1" id="sec.639" provision.type="other" spent.amends="0"><no>639</no><heading guid="_76c950d0-587b-452d-ab7e-aee2f3a92d96" id="sec.639-he">When measurement scheme must be revised</heading><subclause affected.by.uncommenced="0" guid="_8563259e-82f5-48d5-9b59-40d23fbb08a6" id="sec.639-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The controller of a meter must appropriately revise the measurement scheme for the meter in any of the following circumstances—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_75a19790-880c-408b-8def-8493f7b78af3" id="sec.639-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the controller has installed, or proposes to install, a meter to which the scheme does not apply or that does not comply with the scheme;</txt></block></li><li guid="_9844e0f5-4708-4e76-9800-8c9906664d24" id="sec.639-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the making or amendment of an Australian standard or other standard that makes it appropriate to revise the scheme;</txt></block></li><li guid="_0f2b839b-79ed-4dfc-8a40-08d8ff51d4a4" id="sec.639-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the happening of an event relevant to the meter of which the controller is aware, or ought reasonably to have been aware;</txt><note guid="_5ee93ba5-fb45-4f4a-834f-7038a632646e" id="sec.639-ssec.1-para1.c-note" type="example"><heading guid="_3800c338-48a5-4e57-9d42-0a5ac04e1241" id="sec.639-ssec.1-para1.c-note-he">Examples of an event—</heading><block><txt break.before="1">a development in technical knowledge or hazard assessment</txt></block></note></block></li><li guid="_a5e655d7-eb2f-4e60-bdec-9ec0a64be73d" id="sec.639-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">proposed modifications to the meter or activities under the scheme that make it appropriate to revise the scheme;</txt></block></li><li guid="_e64f0461-2215-4104-8dc3-4802a8304809" id="sec.639-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">it is proposed to change competencies required for persons carrying out activities under the scheme;</txt></block></li><li guid="_dc07ccf7-36f9-4d48-86f3-05ff87514536" id="sec.639-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">the controller becomes aware of a significant anomaly in the scheme;</txt></block></li><li guid="_a625ebe4-23ed-4e92-bc10-c637d1059a6e" id="sec.639-ssec.1-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">there is a likelihood of inaccurate measurements under the scheme.</txt></block></li></list></block><penalty guid="_39303be2-1ce2-416c-bc34-df64915ff619" id="sec.639-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty><note guid="_b9a24b03-4a9d-4339-a884-098572f1a6f6" id="sec.639-ssec.1-note" type="example"><heading guid="_373a19dc-f240-4178-b4fb-78439f65da86" id="sec.639-ssec.1-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_991a3ff7-6ef1-40e5-bada-04b390430f92" id="sec.639-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_21328742-07a7-4c35-b831-706cc6ab9ae6" id="sec.639-ssec.2-def.revise_"><txt break.before="1"><defterm guid="_6642316e-6172-41e6-b13d-b6d700892fce" id="sec.639-ssec.2-def.revise" type="definition">revise</defterm> means amend or remake.</txt></definition></deflist></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_2cb28fd4-ec83-4d7a-9f41-72ac0faa82af" id="ch.8-pt.2-div.2"><no>Division 2</no><heading guid="_7e5f217f-6a3d-4956-9e34-83385979bac3" id="ch.8-pt.2-div.2-he">Compliance with measurement scheme</heading><clause affected.by.uncommenced="0" guid="_b7eebef1-86ec-4768-bd25-d4bd073f37a1" id="sec.640" provision.type="other" spent.amends="0"><no>640</no><heading guid="_a8e24b23-fd3e-48ab-a4b5-308b3bbc3f02" id="sec.640-he">Meter installation or use must comply with scheme</heading><block><txt break.before="1">A person must not install or use a meter unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_898e2802-a389-4a1e-9606-79745f798e4d" id="sec.640-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a measurement scheme that applies to the meter has been made; and</txt></block></li><li guid="_6df4c2c5-7228-4e35-b1a4-f0e0ccfa319b" id="sec.640-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the scheme complies with <intref check="valid" refid="sec.637" target.guid="_de7f30f4-0eb3-47e7-98b1-f51b78db6ae8">section 637</intref>; and</txt></block></li><li guid="_80ef4882-5a1c-452a-8da9-af3e5964ca6f" id="sec.640-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the installation or use complies with the scheme.</txt></block></li></list></block><penalty guid="_25a8b6c6-794a-49af-a681-505761cbc6c9" id="sec.640-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty><note guid="_d84e2acf-bed4-4a67-b4b7-e7f3f3b6dc63" id="sec.640-note" type="example"><heading guid="_abd93a96-0a5f-4454-bc3d-a79eb37a2fe9" id="sec.640-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_e909d109-9e21-410c-8705-a5223b0951fe" id="sec.640-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">See also <intref check="valid" refid="sec.658" target.guid="_0c452306-38fe-4fed-952b-f68eb9c4792b">section 658</intref> (Authorisation required to install or use prepayment meters).</txt></block></li><li guid="_14589659-ec67-49c3-96e4-c5accdd203f9" id="sec.640-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></li></list></block></note></clause><clause affected.by.uncommenced="0" guid="_fba8f851-5b47-462d-b47f-f8e874c9b259" id="sec.641" provision.type="other" spent.amends="0"><no>641</no><heading guid="_eaf5f913-5b20-47ff-83f0-dcf4fa359e24" id="sec.641-he">Measurement must comply with scheme</heading><block><txt break.before="1">A person must not measure petroleum or fuel gas through a meter unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2a88d914-dc46-4361-8367-53304e0473a5" id="sec.641-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the measurement is done in a way that complies with the measurement scheme that applies to the meter; and</txt></block></li><li guid="_7f6f84ea-7c03-4127-b742-7b7f7c2ccd23" id="sec.641-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the scheme complies with <intref check="valid" refid="sec.637" target.guid="_de7f30f4-0eb3-47e7-98b1-f51b78db6ae8">section 637</intref>.</txt></block></li></list></block><penalty guid="_a2ab6fad-9104-4902-b23a-d9f5e9c1e2c7" id="sec.641-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></clause><clause affected.by.uncommenced="0" guid="_0164ac4d-aa3d-43f5-b732-3a45abb16d24" id="sec.642" provision.type="other" spent.amends="0"><no>642</no><heading guid="_c49b3b13-84f7-4741-90fb-8f6b4a84c639" id="sec.642-he">Controller responsible for compliance with measurement scheme</heading><subclause affected.by.uncommenced="0" guid="_da10ea12-82e8-4f09-9b71-8d8c9d53aef2" id="sec.642-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The controller of a meter must ensure everyone carrying out activities to which the measurement scheme for the meter applies complies with the scheme.</txt></block><penalty guid="_e44125e5-edd3-4937-a525-111401404f65" id="sec.642-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty><note guid="_b6896eb3-5337-4af1-bf72-7e17184bdd6d" id="sec.642-ssec.1-note" type="example"><heading guid="_5e11faa9-3503-46bb-ae66-98aa2f8677dc" id="sec.642-ssec.1-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_badb582e-26fc-4dd5-b31d-fc82d63b33df" id="sec.642-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Evidence that another person has been convicted of an offence against <intref check="valid" refid="sec.640" target.guid="_b7eebef1-86ec-4768-bd25-d4bd073f37a1">section 640</intref> or <intref check="valid" refid="sec.641" target.guid="_fba8f851-5b47-462d-b47f-f8e874c9b259">641</intref> is evidence that the controller committed the offence of failing to ensure the other person complies with the scheme.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_34c814d2-5718-412c-b52d-bb6460543a94" id="ch.8-pt.2-div.3"><no>Division 3</no><heading guid="_5a576908-6956-4dad-9ecc-9c1263996150" id="ch.8-pt.2-div.3-he">Regulatory provisions</heading><clause affected.by.uncommenced="0" guid="_9fec020e-72db-4931-9e75-92534f5b22f3" id="sec.643" provision.type="other" spent.amends="0"><no>643</no><heading guid="_f30ce078-825c-434d-a057-6f5e6b396879" id="sec.643-he">Chief executive’s powers if no measurement scheme</heading><subclause affected.by.uncommenced="0" guid="_b95a5772-bb17-4721-8942-f9250d7cc068" id="sec.643-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the chief executive is satisfied no measurement scheme applies to a meter, the chief executive may, by notice to the controller of the meter prohibit, or impose conditions on, its use or operation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fa64131f-8a6d-49a3-84e8-085c358ebaaf" id="sec.643-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must include, or be accompanied by, an information notice about the decision to make the prohibition or impose the conditions.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7b84a5c6-53ba-4c25-95bb-9b198369c5f1" id="sec.643-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The controller must comply with the notice.</txt></block><penalty guid="_c88e33d2-67e1-44df-8fa9-f752f4e82420" id="sec.643-ssec.3-pen"><block><txt break.before="1">Maximum penalty for <intref check="valid" refid="sec.643-ssec.3" target.guid="_7b84a5c6-53ba-4c25-95bb-9b198369c5f1">subsection (3)</intref>—500 penalty units.</txt></block></penalty><note guid="_1ac37ff1-332c-4c7a-972c-2f76a088d6d8" id="sec.643-ssec.3-note" type="example"><heading guid="_353aec44-fe57-457e-9995-1b562bf39746" id="sec.643-ssec.3-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause></clause><clause affected.by.uncommenced="0" guid="_9d313b39-e93e-44b3-9105-e58778c29e44" id="sec.644" provision.type="other" spent.amends="0"><no>644</no><heading guid="_1b212476-b572-429a-9d7a-f53269b5b056" id="sec.644-he">Notice by chief executive of unsatisfactory measurement scheme</heading><subclause affected.by.uncommenced="0" guid="_1227bb1b-ff9f-4358-b3ff-bb66fb7bd4d5" id="sec.644-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the chief executive reasonably believes a measurement scheme for a meter does not comply with <intref check="valid" refid="sec.637" target.guid="_de7f30f4-0eb3-47e7-98b1-f51b78db6ae8">section 637</intref> or must be revised under <intref check="valid" refid="sec.639" target.guid="_c691cdfd-1dee-42a9-a295-4df6447adbc1">section 639</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_dfbb5bd0-bc58-443a-99b0-802c59d2b083" id="sec.644-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive must give the controller notice—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ef4d7b1d-55b6-4761-8797-246cb710a076" id="sec.644-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">stating the belief, and the reasons for it; and</txt></block></li><li guid="_5f75c998-2984-4793-ad16-ccea268abc82" id="sec.644-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">requiring the controller within a stated reasonable period to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cfffa3c9-84f9-43e7-8a9c-6d4d3a2f563a" id="sec.644-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">amend the scheme so that it complies with <intref check="valid" refid="sec.637" target.guid="_de7f30f4-0eb3-47e7-98b1-f51b78db6ae8">section 637</intref>, or, if appropriate, revise the scheme under <intref check="valid" refid="sec.639" target.guid="_c691cdfd-1dee-42a9-a295-4df6447adbc1">section 639</intref>, and lodge a notice that the scheme has been so amended or revised; or</txt></block></li><li guid="_3422dca1-5980-415f-bed0-80810b9d6c52" id="sec.644-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">lodge submissions as to why the scheme complies with <intref check="valid" refid="sec.637" target.guid="_de7f30f4-0eb3-47e7-98b1-f51b78db6ae8">section 637</intref>, or that a revision is not required under <intref check="valid" refid="sec.639" target.guid="_c691cdfd-1dee-42a9-a295-4df6447adbc1">section 639</intref>.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1379dded-e497-4448-9760-b228fc88c6fd" id="sec.644-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The notice may state how the chief executive considers the scheme should be amended.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_534af429-8ce4-4f7c-bf44-d3ac636aadb1" id="sec.645" provision.type="other" spent.amends="0"><no>645</no><heading guid="_b93c0af9-b0d0-4957-8209-fd88e7803c40" id="sec.645-he">Considering submissions</heading><subclause affected.by.uncommenced="0" guid="_f2a72a02-8123-4c24-b1ec-e64fc6c5860a" id="sec.645-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, within the period stated in a notice given under <intref check="valid" refid="sec.644" target.guid="_9d313b39-e93e-44b3-9105-e58778c29e44">section 644</intref><intref check="valid" refid="sec.644-ssec.2" target.guid="_dfbb5bd0-bc58-443a-99b0-802c59d2b083">(2)</intref> to a controller, the controller lodges a submission under that section.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2e7f421e-d0b4-42d2-9c90-a316331c2aac" id="sec.645-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive must consider the submission.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_87eef43e-38b9-4c7e-88f4-aafec1e01d74" id="sec.645-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the chief executive decides the scheme does comply or does not need to be revised, the chief executive must give the controller notice of the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_698add4a-2428-4150-82e6-0d08b852cefc" id="sec.646" provision.type="other" spent.amends="0"><no>646</no><heading guid="_518cf347-6846-44b3-8ef8-397ca0399194" id="sec.646-he">Revision notice</heading><subclause affected.by.uncommenced="0" guid="_16aebd53-16ce-43dd-bd9f-88b494e411f0" id="sec.646-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, after complying with <intref check="valid" refid="sec.645" target.guid="_534af429-8ce4-4f7c-bf44-d3ac636aadb1">section 645</intref>, the chief executive still believes the relevant measurement scheme does not comply with <intref check="valid" refid="sec.637" target.guid="_de7f30f4-0eb3-47e7-98b1-f51b78db6ae8">section 637</intref> or must be revised under <intref check="valid" refid="sec.639" target.guid="_c691cdfd-1dee-42a9-a295-4df6447adbc1">section 639</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7f374762-3d50-46f3-8582-5b72f9ac0b9f" id="sec.646-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may give the controller notice (the <defterm guid="_67506578-350b-41ca-8f72-50c209055074" id="sec.646-def.revisionnotice" type="definition">revision notice</defterm>) requiring the controller to amend or remake the measurement scheme so that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c4370d1e-ff58-4028-97ab-5136ad10ffe6" id="sec.646-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">it complies with <intref check="valid" refid="sec.637" target.guid="_de7f30f4-0eb3-47e7-98b1-f51b78db6ae8">section 637</intref>; and</txt></block></li><li guid="_17a00076-5c5d-40cf-9cce-693554cc5d02" id="sec.646-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the chief executive believes it must be revised under <intref check="valid" refid="sec.639" target.guid="_c691cdfd-1dee-42a9-a295-4df6447adbc1">section 639</intref>—the revision is made.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0c8e692b-99c0-4685-b73f-24cbcc49e9e7" id="sec.646-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The revision notice must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_39be0fbc-d1d2-4bff-82f6-4e0263524d98" id="sec.646-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">state how the chief executive believes the measurement scheme does not comply with <intref check="valid" refid="sec.637" target.guid="_de7f30f4-0eb3-47e7-98b1-f51b78db6ae8">section 637</intref> or must be revised under <intref check="valid" refid="sec.639" target.guid="_c691cdfd-1dee-42a9-a295-4df6447adbc1">section 639</intref>; and</txt></block></li><li guid="_00b827c3-28bb-497d-842b-43281b1ae49a" id="sec.646-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state a period within which the controller must comply with the revision notice; and</txt></block></li><li guid="_b9fd7e2d-a0a0-4484-8324-039d0ee045e9" id="sec.646-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">be accompanied by, or include, an information notice about the decisions to give the revision notice and to fix the stated period.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6cf82131-fe14-4b33-94f7-7785e5c21155" id="sec.646-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The controller must comply with the revision notice.</txt></block><penalty guid="_53dbef31-7a2f-4c04-b735-7b6aa6812c15" id="sec.646-ssec.4-pen"><block><txt break.before="1">Maximum penalty for <intref check="valid" refid="sec.646-ssec.4" target.guid="_6cf82131-fe14-4b33-94f7-7785e5c21155">subsection (4)</intref>—500 penalty units.</txt></block></penalty><note guid="_78e3dc3f-0425-4bec-b9c7-1146eb9fa4a9" id="sec.646-ssec.4-note" type="example"><heading guid="_b88a162b-8ee1-4dd2-8402-8a035dbbcdff" id="sec.646-ssec.4-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause></clause></division><division affected.by.uncommenced="0" guid="_778a3d26-65f4-45d5-9969-ea24b33edadc" id="ch.8-pt.2-div.4"><no>Division 4</no><heading guid="_89250ec0-b9a1-499f-a76b-44fb57eb350f" id="ch.8-pt.2-div.4-he">Significant meter anomalies</heading><clause affected.by.uncommenced="0" guid="_18140461-ac32-4e5b-a8fb-8bf3334a7374" id="sec.647" provision.type="other" spent.amends="0"><no>647</no><heading guid="_bdcf30c4-ca42-4a3b-9953-d313fff8d55a" id="sec.647-he">Application of <intref check="valid" refid="ch.8-pt.2-div.4" target.guid="_778a3d26-65f4-45d5-9969-ea24b33edadc">div 4</intref></heading><block><txt break.before="1">This division applies if the controller of a meter becomes aware of an anomaly relating to the meter that causes, or may cause, the meter to be less accurate than its tolerance for error.</txt></block></clause><clause affected.by.uncommenced="0" guid="_47c7731e-8707-4e00-8e46-96162e9fc2f1" id="sec.648" provision.type="other" spent.amends="0"><no>648</no><heading guid="_1423f4ec-ebe4-4d93-b6a3-387f8a7a38c2" id="sec.648-he">Restrictions on use of meter</heading><subclause affected.by.uncommenced="0" guid="_24b1315f-d018-4ada-9c54-9279934eafc5" id="sec.648-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The controller must, as soon as practicable, stop any use of the meter.</txt></block><penalty guid="_29ca2db7-defe-4124-8020-32fd44d38149" id="sec.648-ssec.1-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty><note guid="_77ded978-ac20-4fde-b0ca-87506d12c8ea" id="sec.648-ssec.1-note" type="example"><heading guid="_3094f81c-958a-46e9-9bd9-6af9e7432c1e" id="sec.648-ssec.1-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_0c1135e1-4f74-4297-a12a-75439c18c7c0" id="sec.648-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The controller must not use the meter or resume the use of the meter until the anomaly has been corrected.</txt></block><penalty guid="_28ba40d3-b61d-4045-92b0-ba722db68aa4" id="sec.648-ssec.2-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty><note guid="_e57a69fe-67d4-45c0-8726-3d88313a151d" id="sec.648-ssec.2-note" type="example"><heading guid="_4db4483f-4d43-4ef1-85a1-8c6e253c21d5" id="sec.648-ssec.2-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause></clause><clause affected.by.uncommenced="0" guid="_3cfaeade-df7f-4cf5-909e-0468ceb10f65" id="sec.649" provision.type="other" spent.amends="0"><no>649</no><heading guid="_24c41b65-faea-4e8c-b542-d370bfafaf3c" id="sec.649-he">Obligation to report if required</heading><block><txt break.before="1">If the chief executive has required the controller to lodge a notice of the anomaly, or that type of anomaly, the controller must give the notice as soon as practicable.</txt></block><penalty guid="_5177fc60-e881-4f33-90fd-a61941c65117" id="sec.649-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty><note guid="_7453a1ae-e36d-4135-b7c4-8071e378e1d3" id="sec.649-note" type="example"><heading guid="_72f21bf2-1d1e-408c-ae31-253f7951b557" id="sec.649-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></clause></division><division affected.by.uncommenced="0" guid="_6e803930-ba19-40e4-8c2b-0d7cd9b9427c" id="ch.8-pt.2-div.5"><no>Division 5</no><heading guid="_540bc743-fbd8-408c-b283-ab114b47d1e4" id="ch.8-pt.2-div.5-he">Other reporting requirements</heading><clause affected.by.uncommenced="0" guid="_b4e7eb9b-56fa-4865-82e2-d6d236301816" id="sec.650" provision.type="other" spent.amends="0"><no>650</no><heading guid="_f6d7a4a9-9277-47a9-ac00-a963e9df63a1" id="sec.650-he">Annual measurement report</heading><subclause affected.by.uncommenced="0" guid="_f467a783-29e6-4e55-b5e5-3773c3d26599" id="sec.650-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The controller of a meter must, on or before 1 September each year, lodge a measurement report about its measurement scheme for the preceding financial year that complies with <intref check="valid" refid="sec.651" target.guid="_c3a53db8-2830-4eea-9b44-99a138dc413f">section 651</intref>.</txt></block><penalty guid="_b9dfd3e5-0da8-4352-8be5-4269c063f799" id="sec.650-ssec.1-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_b258859d-b621-4e13-904f-8502aba76d62" id="sec.650-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">It is not a defence to a proceeding for an offence against <intref check="valid" refid="sec.650-ssec.1" target.guid="_f467a783-29e6-4e55-b5e5-3773c3d26599">subsection (1)</intref> that the lodging of the report or information it contains might tend to incriminate the controller.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bbf5bfd7-9470-4ad1-b8a2-5ebda1cc14d9" id="sec.650-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, evidence of, or evidence directly or indirectly derived from, the report or information it contains that might tend to incriminate the controller is not admissible in evidence against the controller in a civil or criminal proceeding, other than a proceeding for an offence for which the falsity or misleading nature of the answer is relevant.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c3a53db8-2830-4eea-9b44-99a138dc413f" id="sec.651" provision.type="other" spent.amends="0"><no>651</no><heading guid="_a19707a3-55d2-4c3f-a3d1-7e01fd83c45f" id="sec.651-he">Content requirements for annual measurement reports</heading><block><txt break.before="1">A measurement report under <intref check="valid" refid="sec.650" target.guid="_b4e7eb9b-56fa-4865-82e2-d6d236301816">section 650</intref> must state all of the following information for the measurement scheme the subject of the report for the financial year to which the report relates—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3ff1037c-7e79-4d8c-9b5d-ceec0257478a" id="sec.651-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the controller’s name and contact details;</txt></block></li><li guid="_613821d0-9070-4fdc-8733-2df6d861bd00" id="sec.651-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the nature and extent of the metering operations;</txt></block></li><li guid="_b9391ceb-0539-4b52-b137-2bcc1ece17f0" id="sec.651-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">whether or not the operations complied with the scheme and this Act;</txt></block></li><li guid="_9f81a607-b346-4ef8-b6e6-7acd376cc3d9" id="sec.651-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">an assessment against the key performance indicators for the scheme, as required under <intref check="valid" refid="sec.637" target.guid="_de7f30f4-0eb3-47e7-98b1-f51b78db6ae8">section 637</intref><intref check="valid" refid="sec.637-ssec.1" target.guid="_53036442-cb9c-4d02-9366-c98d50d633da">(1)</intref><intref check="valid" refid="sec.637-ssec.1-para1.g" target.guid="_0f940630-105c-461d-9507-9831bc492d1c">(g)</intref>;</txt></block></li><li guid="_8820af0e-a262-4fc3-8c6c-47419e25a956" id="sec.651-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">if the operations have not complied with the scheme or this Act—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bfa2a0e7-8673-4c0e-920a-73a22d00d3a8" id="sec.651-para1.e-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">details of each noncompliance; and</txt></block></li><li guid="_b52111ab-b4cf-4c69-9d57-5707838854f1" id="sec.651-para1.e-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">details of any remediation of the noncompliance; and</txt></block></li><li guid="_0f3ce353-5b6d-4a35-a39c-709d20107f2a" id="sec.651-para1.e-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">if the noncompliance has not been remedied in whole or part—how it is proposed to remedy the noncompliance.</txt></block></li></list></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_02b445df-f6af-4aa1-b656-d03c604f6abb" id="sec.652" provision.type="other" spent.amends="0"><no>652</no><heading guid="_c8e81758-ecdc-4e61-9821-a70ad9bbbce4" id="sec.652-he">Power to require information about persons acting under measurement scheme</heading><subclause affected.by.uncommenced="0" guid="_96a02391-bb06-444b-b2f0-f7ff5f2f234c" id="sec.652-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may, by a notice given to a controller of a meter, require the controller to lodge, within a stated period, notice of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e793af56-250a-4e2a-9689-b702dd19c247" id="sec.652-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the names of, and the competencies held by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_10bb95b1-5365-442a-83bd-bd3f953e0d11" id="sec.652-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">each person who carries out activities for which competencies are required under the measurement scheme for the meter; or</txt></block></li><li guid="_6dad735a-bfab-4e38-9904-4327d24e0d32" id="sec.652-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a stated type of persons who carry out the activities; or</txt></block></li></list></block></li><li guid="_c56d5d50-441c-492a-b78e-8b4a372c7474" id="sec.652-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the competencies held by a stated person who carries out the activities.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1b898a97-076f-4203-aef4-ce7cc296514c" id="sec.652-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The stated period must not end before 10 business days after the notice is given.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e125d07f-e1de-4539-83cf-37b67fdda482" id="sec.652-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The controller must comply with the requirement.</txt></block><penalty guid="_65a7bad0-2542-4985-b7cb-371acec0452e" id="sec.652-ssec.3-pen"><block><txt break.before="1">Maximum penalty for <intref check="valid" refid="sec.652-ssec.3" target.guid="_e125d07f-e1de-4539-83cf-37b67fdda482">subsection (3)</intref>—100 penalty units.</txt></block></penalty></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_8d5ec948-937c-446c-b77b-6f31eefc9964" id="ch.8-pt.3"><no>Part 3</no><heading guid="_65604958-0e4e-4703-886d-71c925d0181d" id="ch.8-pt.3-he">Competency assessments</heading><clause affected.by.uncommenced="0" guid="_749057a4-eb92-4df9-8f57-811dd03b03e9" id="sec.653" provision.type="other" spent.amends="0"><no>653</no><heading guid="_27bf1eaa-d285-4318-ada1-f31acd088d6a" id="sec.653-he">Chief executive’s power to require competency assessment</heading><subclause affected.by.uncommenced="0" guid="_ea6c2991-cb1a-4f76-9c70-ea8ce464e920" id="sec.653-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may, by notice, (a <defterm guid="_934e2dc8-69c4-4f6f-aed9-aae1c30c606b" id="sec.653-def.competencyassessmentnotice" type="definition">competency assessment notice</defterm>) require the controller of a meter to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2e1660d2-b812-4bc9-bdb6-07d079328bce" id="sec.653-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">assess the competency (a <defterm guid="_07c318a9-8dce-4594-9545-0fa3ced67da5" id="sec.653-ssec.1-def.competencyassessment" type="definition">competency assessment</defterm>) of a person who carries out—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_596dc63c-592b-4525-96d7-54373bc85412" id="sec.653-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">measurement activities under the measurement scheme for the meter; or</txt></block></li><li guid="_91e02594-041e-4029-adeb-0340cb31f189" id="sec.653-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">other activities relating to the meter; and</txt><note guid="_652fae39-1a3f-4ace-acef-f94220126ee7" id="sec.653-ssec.1-para1.a-para2.ii-note" type="example"><heading guid="_c1504f70-ea02-4e2a-9364-0e9032183bb1" id="sec.653-ssec.1-para1.a-para2.ii-note-he">Examples of other activities—</heading><block><txt break.before="1">removing and replacing meters</txt></block></note></block></li></list></block></li><li guid="_f51f03a7-3249-4029-abfe-c7e9e7c96a52" id="sec.653-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give the person a report about the outcome of the assessment within a stated reasonable period after the assessment takes place; and</txt></block></li><li guid="_451f89a0-ab16-4b83-b740-0b1f7dca0cdb" id="sec.653-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">lodge a copy of the report.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5bd80e58-ee98-4d77-bb43-80288a2c9cbc" id="sec.653-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The competency assessment notice must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ab779115-9798-42bf-aa2d-09fea9c71b1c" id="sec.653-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a period (the <defterm guid="_2433c3ff-f321-4dcf-9da0-239dcd5a27e3" id="sec.653-ssec.2-def.assessmentperiod" type="definition">assessment period</defterm>) during which the assessment must take place; and</txt></block></li><li guid="_27ae161d-0144-4aed-980f-8481c9df79e9" id="sec.653-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">reasons for the decision to carry out the assessment.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c5806705-4967-4aa1-acb4-40ffab98e016" id="sec.653-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The assessment period must be at least 20 business days after the competency assessment notice is given.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_334f9f20-2159-425c-9e45-9cd048d21711" id="sec.653-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The competency assessment notice may also require the assessment to be carried out for the controller by a stated person.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ba840495-efbf-4169-a1d2-e7d971236661" id="sec.653-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The controller must comply with the competency assessment notice.</txt></block><penalty guid="_35affdbb-2405-4fa1-b7a2-91079bf08ae4" id="sec.653-ssec.5-pen"><block><txt break.before="1">Maximum penalty for <intref check="valid" refid="sec.653-ssec.5" target.guid="_ba840495-efbf-4169-a1d2-e7d971236661">subsection (5)</intref>—300 penalty units.</txt></block></penalty></subclause></clause><clause affected.by.uncommenced="0" guid="_2443d095-fe5b-4449-b90a-2a12326f115a" id="sec.654" provision.type="other" spent.amends="0"><no>654</no><heading guid="_d3be4cc9-9445-4949-8bce-bc757965668f" id="sec.654-he">Costs of competency assessment</heading><block><txt break.before="1">A controller to whom a competency assessment notice has been given must bear the costs of the assessment.</txt></block></clause><clause affected.by.uncommenced="0" guid="_490a0462-cec0-4587-8bba-ba074f839615" id="sec.655" provision.type="other" spent.amends="0"><no>655</no><heading guid="_8db6429e-9959-4a08-b0bd-cc4fa0d1290d" id="sec.655-he">Requirements following competency assessment</heading><subclause affected.by.uncommenced="0" guid="_8fdaa20b-69ea-4a45-ae55-f854254adf19" id="sec.655-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the chief executive considers a report lodged under <intref check="valid" refid="sec.653" target.guid="_749057a4-eb92-4df9-8f57-811dd03b03e9">section 653</intref> about a competency assessment shows that the person assessed is not competent to carry out an activity relating to the relevant meter.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_92d41388-cb0a-4e5a-8876-13eaa104718a" id="sec.655-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may give the person assessed and the relevant controller notice—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_78e50b2f-3c0b-4f86-b203-b590963e7fe6" id="sec.655-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">requiring them to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b9d0d80f-21d7-4973-8af3-05094a8bb3a3" id="sec.655-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">take stated remedial action to ensure the person assessed becomes competent to carry out the activity; and</txt></block></li><li guid="_c944a411-51d7-4e74-b838-8102525e3711" id="sec.655-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">give the chief executive notice within a stated reasonable period as to whether or not the action has been taken; or</txt></block></li></list></block></li><li guid="_e432dfd3-cb2f-414e-9866-d5bf8947f4ee" id="sec.655-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">requiring the person assessed not to carry out stated activities for a stated period or until the happening of a stated event; or</txt><note guid="_12d952a5-5277-454d-810f-6d79282bb609" id="sec.655-ssec.2-para1.b-note" type="example"><heading guid="_5de3878d-48a3-456c-b6c6-7b18404546d1" id="sec.655-ssec.2-para1.b-note-he">Example of a stated event—</heading><block><txt break.before="1">if the notice requires the taking of remedial action, the chief executive’s receipt of a notice under <intref check="valid" refid="sec.655-ssec.2-para1.a" target.guid="_78e50b2f-3c0b-4f86-b203-b590963e7fe6">paragraph (a)</intref><intref check="valid" refid="sec.655-ssec.2-para1.a-para2.ii" target.guid="_c944a411-51d7-4e74-b838-8102525e3711">(ii)</intref> stating that the action has been taken</txt></block></note></block></li><li guid="_42db7498-8e26-4325-96d4-a11cbfbd0a58" id="sec.655-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">requiring that the person assessed may carry out stated activities only on stated conditions.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7d9abcd9-476c-4dab-b2c3-838c596a2029" id="sec.655-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The person assessed and the relevant controller must comply with the notice.</txt></block><penalty guid="_66096e8c-2f7a-440e-9779-bcfed0183984" id="sec.655-ssec.3-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_1df0a994-9ad6-4a8d-a648-b3b0a0afc712" id="sec.655-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The giving of a notice under this section does not prevent a further competency assessment notice being given for the person assessed.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_3e6112b3-924e-446c-bbe1-2722580b7a6c" id="ch.8-pt.4"><no>Part 4</no><heading guid="_eeabe54b-548b-4f79-935a-2b97df9cfa14" id="ch.8-pt.4-he">General provisions about meters</heading><clause affected.by.uncommenced="0" guid="_d9b06af2-a7ba-4cd0-b693-a60ad37e66a4" id="sec.656" provision.type="other" spent.amends="0"><no>656</no><heading guid="_c418f7e6-ff72-4ac6-8dc3-210153d67622" id="sec.656-he">Controller’s obligation to test if inaccuracy suspected</heading><block><txt break.before="1">If a controller of a meter suspects it may be registering inaccurately, the controller must have it tested as soon as practicable.</txt></block><penalty guid="_8edf29b7-3754-4f79-846e-4015eb99c351" id="sec.656-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></clause><clause affected.by.uncommenced="0" guid="_5e7168a7-b360-49df-84ac-1338def1e357" id="sec.657" provision.type="other" spent.amends="0"><no>657</no><heading guid="_8fb1ed90-5971-4178-8042-e7de21bcda99" id="sec.657-he">Unlawfully interfering with meters or devices prohibited</heading><block><txt break.before="1">A person must not unlawfully interfere with—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b21717bd-505c-49da-ba23-79a3e7900ddc" id="sec.657-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a meter; or</txt></block></li><li guid="_f28c44fc-0cd1-431b-9d75-eb1286255dec" id="sec.657-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the operation of a meter; or</txt></block></li><li guid="_2a34a4f5-fb5a-4fb6-b541-42be2a4db30f" id="sec.657-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a security device, seal or stamp attached to a meter.</txt></block></li></list></block><penalty guid="_96252395-741e-4611-bfb0-47845c08a818" id="sec.657-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></clause><clause affected.by.uncommenced="0" guid="_0c452306-38fe-4fed-952b-f68eb9c4792b" id="sec.658" provision.type="other" spent.amends="0"><no>658</no><heading guid="_8a859d12-af4d-4406-bf27-88ea640b3bea" id="sec.658-he">Authorisation required to install or use prepayment meters</heading><subclause affected.by.uncommenced="0" guid="_7c7b64e8-b229-4207-baaa-89d8bb6bb926" id="sec.658-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not install or use a prepayment meter unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c88dea3e-e121-45ed-a2bf-27dbe163c5ef" id="sec.658-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the chief executive has approved the installation or use; and</txt></block></li><li guid="_6b1661cd-edb4-4071-94b5-54be5bcc0ef6" id="sec.658-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any conditions of the approval have been complied with.</txt></block></li></list></block><penalty guid="_34a597e8-e89b-4fa4-a393-419375d995ad" id="sec.658-ssec.1-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_14322038-5d17-4fde-b7cb-c3e2dad50fdb" id="sec.658-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The approval may be given for the installation and use of a stated type of meter at a stated place or stated activity.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_9557fc1d-eda3-4100-b5b6-86643c84cefc" id="ch.8-pt.5"><no>Part 5</no><heading guid="_427d4f63-64f5-418b-8237-eaf8888be371" id="ch.8-pt.5-he">Meter accuracy disputes</heading><division affected.by.uncommenced="0" guid="_a159ee31-0c60-4ade-b2d3-fe10bd3ab6bb" id="ch.8-pt.5-div.1"><no>Division 1</no><heading guid="_a913b1f7-57fe-417e-a3e4-062ce5f38040" id="ch.8-pt.5-div.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_6f3bbc20-93d5-445b-9e41-3da002087c5e" id="sec.659" provision.type="other" spent.amends="0"><no>659</no><heading guid="_ea645587-ef3c-4b1a-8132-7d6e72dce8e4" id="sec.659-he">Application of <intref check="valid" refid="ch.8-pt.5" target.guid="_9557fc1d-eda3-4100-b5b6-86643c84cefc">pt 5</intref></heading><subclause affected.by.uncommenced="0" guid="_61a821d2-e791-49bb-935c-f3b371b65013" id="sec.659-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This part applies to disputes between an affected party for a meter and a service provider for the party about whether the meter is accurate, within its tolerance for error.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0bf2e88d-99da-4fda-89c8-f863a4e92ffc" id="sec.659-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, this part does not apply to a dispute if a contract that binds the affected party and the service provider provides for resolution of the dispute.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b6da4c1e-9c4a-4cd4-9109-c9f4c02e45ad" id="sec.660" provision.type="other" spent.amends="0"><no>660</no><heading guid="_d53ed535-97bc-44ea-a821-89d580c4a2a0" id="sec.660-he">Who is an <defterm guid="_3ee67c87-a6ba-4d0a-8f78-a6926acf8e51" type="mention">affected party</defterm> for a meter</heading><subclause affected.by.uncommenced="0" guid="_4b9498f2-1367-4bd2-98a8-45f799d13794" id="sec.660-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person is an <defterm guid="_cc431011-dc77-4701-95e0-6ca6dcbeccfc" id="sec.660-def.affectedparty-oc.2" type="definition">affected party</defterm> for a meter if the person is, or may be, affected by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8a42c617-8644-4e30-a016-61865277d269" id="sec.660-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the meter possibly registering outside its tolerance for error; or</txt></block></li><li guid="_d3a7e692-815e-459e-b346-48d0e6cb5ded" id="sec.660-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">inaccurate data obtained from the meter.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7bf596b8-c056-4a44-97c3-1da2a5df8d7a" id="sec.660-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Also, the chief executive is an <defterm guid="_83a2aa10-59ec-4d32-ba58-22d844f46cbf" id="sec.660-def.affectedparty-oc.3" type="definition">affected party</defterm> for a meter used to work out the petroleum royalty, including, for example, a meter mentioned in <intref check="valid" refid="sec.629" target.guid="_94354287-f146-489b-90c7-d3a916870248">section 629</intref><intref check="valid" refid="sec.629-para1.b" target.guid="_32b3338a-aa49-4dfe-9d3a-81889577545e">(b)</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e5f641ba-b57a-450a-8057-6d999a79a344" id="sec.661" provision.type="other" spent.amends="0"><no>661</no><heading guid="_1123acb1-0d79-4f54-92b1-89d0249d3262" id="sec.661-he">Who is the <defterm guid="_8f7f5d79-5a78-4905-91ae-8c6b3540f35d" type="mention">service provider</defterm> for an affected party</heading><block><txt break.before="1">The <defterm guid="_24b251ca-ca6c-409d-a601-4f8779534f8e" id="def.serviceprovider" type="definition">service provider</defterm>, for an affected party, is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b321e138-d411-4081-b322-7e582187de12" id="sec.661-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a person who provides a service relating to the relevant meter; or</txt></block></li><li guid="_12f9c46e-99a0-4fe8-bee2-9aaf6269bfa6" id="sec.661-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the petroleum tenure holder who must pay petroleum royalty for petroleum measured by the relevant meter.</txt></block></li></list></block></clause></division><division affected.by.uncommenced="0" guid="_b232d9e3-2b4e-4605-a5c0-baf9c992c010" id="ch.8-pt.5-div.2"><no>Division 2</no><heading guid="_883c496d-f50f-43c3-b842-3ed161325a6b" id="ch.8-pt.5-div.2-he">Test by service provider</heading><clause affected.by.uncommenced="0" guid="_8bc66cfb-bd07-48ae-9263-0ee2ff47b25d" id="sec.662" provision.type="other" spent.amends="0"><no>662</no><heading guid="_8cbde3d5-1d0e-4f01-a48e-615acb811433" id="sec.662-he">Service provider test</heading><subclause affected.by.uncommenced="0" guid="_264b8ffe-c59f-4b3c-bc3e-d5ce4bb5e2da" id="sec.662-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An affected party for a meter may give the party’s service provider notice requiring a test to work out whether the meter is registering within its tolerance for error (a <defterm guid="_22409309-d5cf-441c-90a8-15c29f65748f" id="sec.662-def.serviceprovidertest" type="definition">service provider test</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8a9b1439-c696-4aa5-97d1-6fca32f718ef" id="sec.662-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must be accompanied by any reasonable fee required by the service provider.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1f766e79-c3a5-4dd7-a1bd-abb1b12ed7db" id="sec.662-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The service provider must, as soon as practicable—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c289c385-95a8-48c4-91e9-ada0d5db900c" id="sec.662-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">cause an appropriately qualified person to carry out the test; and</txt></block></li><li guid="_378fb029-d263-4a91-85fc-58981bb9ee7a" id="sec.662-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">obtain a meter test certificate for the test; and</txt></block></li><li guid="_cacc16aa-5439-4e56-a84c-edf3ea7ac8c2" id="sec.662-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">give a copy of the certificate to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6f85a837-76d6-4f0f-846c-fd6715333be8" id="sec.662-ssec.3-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the affected party; and</txt></block></li><li guid="_5f9a550a-972f-4f23-b4a5-3b68907fe576" id="sec.662-ssec.3-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the service provider is not the controller of the meter—the controller.</txt></block></li></list></block></li></list></block><penalty guid="_e00d59b3-58b8-4f3a-a061-00da618adaee" id="sec.662-ssec.3-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_010271db-4570-462c-a932-75f774bc8577" id="sec.662-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the service provider reasonably considers the meter can not conveniently or safely be tested on its site, the provider must immediately advise the affected party.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_dd7d810a-acc5-4ace-bca0-0155f8811901" id="sec.662-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The advice must include how long the meter will be away from the site and any additional charges likely to be incurred.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_53443d2d-e8c1-48c4-a284-5a3a727a0e98" id="sec.662-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The affected party may, at any time, withdraw the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_315076ef-016b-45cf-8278-c245e8a35861" id="sec.662-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">If the withdrawal is made before the test is completed, the service provider must refund the fee for the test, less any cost already incurred in carrying out the test.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8651d4a2-8d9f-436c-8c72-c13e6e1bbd53" id="sec.663" provision.type="other" spent.amends="0"><no>663</no><heading guid="_3db0cbba-ecbe-4349-b28c-d044f9de52f9" id="sec.663-he">Content requirements for meter test certificate</heading><block><txt break.before="1">A meter test certificate under this part must be a certificate by the person who carried out the test stating each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c60f533a-f937-4983-a4f4-2f688065704b" id="sec.663-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">full details of the test;</txt></block></li><li guid="_a35530f2-233b-4441-bce6-496d0587b33c" id="sec.663-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the tolerance for error for the relevant meter;</txt></block></li><li guid="_c3865390-7317-425e-be31-c1f003c25b17" id="sec.663-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">whether the meter was found to be registering within or outside its tolerance for error;</txt></block></li><li guid="_abcdf9ba-a6c3-4f99-924f-2d9cb9ce2ff0" id="sec.663-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">if the meter was found to be registering outside its tolerance for error—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_de103596-9942-4d6d-ba40-e05d260d7320" id="sec.663-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the percentage of error found; and</txt></block></li><li guid="_856bb238-8315-415c-9e8f-b777f549e459" id="sec.663-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">whether the error was in favour of the affected party or the service provider; and</txt></block></li><li guid="_cb73ffb1-4c81-4d91-86a9-6543ed439162" id="sec.663-para1.d-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">any known cause of the error.</txt></block></li></list></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_11be6024-26db-4eda-92e8-a533bc65c195" id="sec.664" provision.type="other" spent.amends="0"><no>664</no><heading guid="_f13157d0-826b-457d-895b-bd472b101412" id="sec.664-he">Refund if test shows inaccuracy in service provider’s favour</heading><block><txt break.before="1">If a service provider test shows the meter tested is registering outside its tolerance for error and in the provider’s favour, the provider must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8840d256-4722-4690-9708-d56f39655449" id="sec.664-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">pay for the cost of the test; and</txt></block></li><li guid="_af88a8c6-a074-476a-8a41-bbf3e9be4e79" id="sec.664-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">refund the affected party any amount the party paid the provider for the test.</txt></block></li></list></block><penalty guid="_8954deed-7e34-4172-a5fc-7797ef286ed8" id="sec.664-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></clause><clause affected.by.uncommenced="0" guid="_75539335-7c4e-47e4-b980-7cb0f1461e9c" id="sec.665" provision.type="other" spent.amends="0"><no>665</no><heading guid="_d080b78a-adaf-4ad4-9fd0-11b52cba33ea" id="sec.665-he">Restriction on tester adjusting meter</heading><block><txt break.before="1">If a person who carries out a service provider test of a meter finds it is not registering or registering outside its tolerance for error, the person must not adjust the meter unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_27f72035-28c1-459f-ad36-99d2214f0eac" id="sec.665-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the person has told the affected party that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d0411371-7434-43ff-94cb-ea61bb552dd0" id="sec.665-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the meter is not registering or is registering outside its tolerance for error, and, if it is registering outside its tolerance for error, the percentage of error found; and</txt></block></li><li guid="_29cc20ee-d732-474a-9af5-04bca228f422" id="sec.665-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the person wishes to make the adjustment; and</txt></block></li><li guid="_7f749158-269c-4234-aa6d-b89a556e9cd8" id="sec.665-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">if the adjustment is made, a validation test of the meter will not be able to be carried out; and</txt></block></li></list></block></li><li guid="_afd2be73-fe5f-4642-b755-b30a6656232d" id="sec.665-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the affected party has given the person written consent to make the adjustment.</txt></block></li></list></block><penalty guid="_28ded29d-9ad8-4cd3-b742-49be27fe0497" id="sec.665-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></clause></division><division affected.by.uncommenced="0" guid="_39050520-5713-45cc-a9b8-7df966310fba" id="ch.8-pt.5-div.3"><no>Division 3</no><heading guid="_0645632c-8a41-478e-a8c8-0fba083b58cd" id="ch.8-pt.5-div.3-he">Validation of service provider test</heading><clause affected.by.uncommenced="0" guid="_9476c490-540a-47ab-ac94-c0ca58d55b4c" id="sec.666" provision.type="other" spent.amends="0"><no>666</no><heading guid="_d5875a0d-761c-4441-8d69-d988f55b4019" id="sec.666-he">Validation test</heading><subclause affected.by.uncommenced="0" guid="_536e59f2-5514-4744-bcd6-84739364a231" id="sec.666-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a service provider test has been carried out for an affected party.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_03d4eb5c-15a3-4236-8c74-c054384c4cf2" id="sec.666-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The party may, by notice to the service provider, require the provider to arrange for a test by any of the following to work out whether the relevant meter is registering within its tolerance for error (a <defterm guid="_cda7e1d7-e69b-43be-b529-10206480f49c" id="sec.666-def.validationtest" type="definition">validation test</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a51abd55-e8ee-4e68-a58a-ef4094dfa54b" id="sec.666-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an appropriately qualified person appointed by the chief executive;</txt></block></li><li guid="_36e3065b-95f9-429a-98fa-9de6d24f524c" id="sec.666-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an accredited National Association of Testing Authorities (NATA) testing facility or an equivalent international facility;</txt></block></li><li guid="_e7651d66-440f-406f-89b0-788d0235acfe" id="sec.666-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">an international testing facility approved by the chief executive.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_31385613-9b22-4e08-a9ba-40a938d31b22" id="sec.666-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The notice must be accompanied by any reasonable fee required by the appointed person or testing facility for the test.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ad0f6014-bb09-447d-8a16-b1baef4bfedd" id="sec.666-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">As soon as practicable after receiving the notice, the service provider must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a4a979a7-ef55-4404-80da-7bc60fb962e0" id="sec.666-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">lodge a copy of it; and</txt></block></li><li guid="_f5422fb9-21f7-435c-ad5e-e5e9aacf5fc8" id="sec.666-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the service provider is not the controller of the meter—give the controller a copy; and</txt></block></li><li guid="_7a8b3d39-e053-47a9-b9cd-759695361c2f" id="sec.666-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">arrange for the appointed person or testing facility to carry out the test.</txt></block></li></list></block><penalty guid="_9aba9382-356c-4354-b04d-f64c3454e2c8" id="sec.666-ssec.4-pen"><block><txt break.before="1">Maximum penalty—50 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_f43f0799-50dc-4cf1-b655-9eed88c606ca" id="sec.666-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The appointed person or testing facility must, as soon as is reasonably practicable—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6a814574-d3ab-4ef8-b237-50e348126c12" id="sec.666-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">carry out the test; and</txt></block></li><li guid="_d90f22cf-1f2b-4790-80f1-0965b29b0156" id="sec.666-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">issue a meter test certificate for the test that complies with <intref check="valid" refid="sec.663" target.guid="_8651d4a2-8d9f-436c-8c72-c13e6e1bbd53">section 663</intref>; and</txt></block></li><li guid="_325d32ab-6d4d-45d0-97c4-bdf654af1e22" id="sec.666-ssec.5-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">give the service provider the certificate.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8f36b190-de86-4b2d-8ad8-90b7ddaa516f" id="sec.666-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The service provider must, as soon as practicable after receiving the certificate—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e19ec83e-9e87-42cd-bf69-250d546cd559" id="sec.666-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">give a copy of it to the affected party and, if the service provider is not the controller of the meter, the controller; and</txt></block></li><li guid="_432076da-20f8-4e73-add1-b7ef94ef0c55" id="sec.666-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">lodge a copy of it.</txt></block></li></list></block><penalty guid="_44c7eabc-9083-4e79-af6a-fc683a448277" id="sec.666-ssec.6-pen"><block><txt break.before="1">Maximum penalty for <intref check="valid" refid="sec.666-ssec.6" target.guid="_8f36b190-de86-4b2d-8ad8-90b7ddaa516f">subsection (6)</intref>—50 penalty units.</txt></block></penalty></subclause></clause><clause affected.by.uncommenced="0" guid="_2d3e19ef-6de1-400b-b2b9-e899ab0c8e0e" id="sec.667" provision.type="other" spent.amends="0"><no>667</no><heading guid="_c9a44f78-63e3-4fac-9f7c-37e78fed6eaf" id="sec.667-he">Refund if test shows inaccuracy in service provider’s favour</heading><block><txt break.before="1">If a validation test of a meter shows it is registering outside its tolerance for error in the service provider’s favour, the provider must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8f71f5b8-081b-4e7e-be4f-ef0ff83bef8e" id="sec.667-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">pay for the costs of the service provider and validation tests; and</txt></block></li><li guid="_36e41d65-44ed-471f-9125-93fd37007709" id="sec.667-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">refund the affected party any amount the party paid for the relevant service provider test and the validation test.</txt></block></li></list></block><penalty guid="_4d25a632-9dfd-4437-b925-87fa75730075" id="sec.667-pen"><block><txt break.before="1">Maximum penalty—50 penalty units.</txt></block></penalty></clause><clause affected.by.uncommenced="0" guid="_6d165af9-b68c-4758-b177-95ffa733d9f3" id="sec.668" provision.type="other" spent.amends="0"><no>668</no><heading guid="_aac34e11-147a-4e0a-a014-dce4e8861fcc" id="sec.668-he">Service provider’s obligations if test shows inaccuracy</heading><subclause affected.by.uncommenced="0" guid="_6d6d1443-835d-48f1-93db-25ea0d2582ab" id="sec.668-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e1a56fde-d118-460d-b608-d5aa34bfd223" id="sec.668-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a validation test of a meter shows it is not registering or is registering outside its tolerance for error; and</txt></block></li><li guid="_acaaf0e5-baf4-4d06-a553-a57f762b75ba" id="sec.668-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the relevant service provider has, under <intref check="valid" refid="sec.666" target.guid="_9476c490-540a-47ab-ac94-c0ca58d55b4c">section 666</intref><intref check="valid" refid="sec.666-ssec.5" target.guid="_f43f0799-50dc-4cf1-b655-9eed88c606ca">(5)</intref><intref check="valid" refid="sec.666-ssec.5-para1.c" target.guid="_325d32ab-6d4d-45d0-97c4-bdf654af1e22">(c)</intref>, been given a meter test certificate for the test.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5abf58a3-7ef0-46a1-be03-4569fe83a741" id="sec.668-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The service provider must, unless it is uneconomic or impractical to do so, adjust the meter so it registers within its tolerance for error.</txt></block><penalty guid="_994fee1a-76bb-42cf-96bc-6838b75bfb12" id="sec.668-ssec.2-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_d348bafe-f5c5-49bb-9d64-4e05a5806737" id="sec.668-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If it is uneconomic or impractical to make the adjustment, the service provider must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6c991503-0e01-44f2-bb62-737aa8a9e5ce" id="sec.668-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">ensure the meter is properly disconnected; and</txt></block></li><li guid="_860b2068-dad7-437d-a6b6-e6f39c9ea2bf" id="sec.668-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">attach firmly to the meter a label clearly bearing the words—‘Inaccurate: not to be used’.</txt></block></li></list></block><penalty guid="_80104222-a7fb-42ac-bf3c-ec877acd0359" id="sec.668-ssec.3-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause></clause></division></part></chapter><chapter affected.by.uncommenced="0" guid="_e115e3d8-9707-4c5d-b3e6-be71f8d522ee" id="ch.9"><no>Chapter 9</no><heading guid="_f378a2f3-3319-480a-9c88-d950011c15f4" id="ch.9-he">Safety</heading><part affected.by.uncommenced="0" guid="_f7270c11-7622-46a5-8996-bea8d3855f8c" id="ch.9-pt.1"><no>Part 1</no><heading guid="_503e69d7-5028-4443-82a0-da43a78484f0" id="ch.9-pt.1-he">Safety requirements</heading><clause affected.by.uncommenced="0" guid="_6b7220f7-5c5d-49d9-8891-f3cd753d86b9" id="sec.669" provision.type="other" spent.amends="0"><no>669</no><heading guid="_b339cfb4-2fac-4534-a812-5090d3022753" id="sec.669-he">Making safety requirement</heading><block><txt break.before="1">A regulation may make requirements (<defterm guid="_bda0ab9c-6935-44d6-96bf-f5e5a705a38f" id="def.safetyrequirements" type="definition">safety requirements</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2d6f2b8b-c2bd-47cf-887d-95dff110df0e" id="sec.669-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for petroleum or fuel gas safety, including, for example, how to achieve an acceptable level of risk under <intref check="valid" refid="sec.700" target.guid="_d7c93f4b-8f90-4bc9-b5b6-5cbd15a37916">section 700</intref>; or</txt></block></li><li guid="_102b9afa-a408-4b8d-ab2e-4fe862f8ba9e" id="sec.669-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">about the carrying out of petroleum exploration or production to ensure it does not adversely affect the safety of current or future coal mining under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>; or</txt></block></li><li guid="_c08b18f8-1d0b-4a42-90d5-0c934ebcc162" id="sec.669-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">about <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage act</name></legref>ivities; or</txt></block></li><li guid="_1b8f9aa9-9ef4-4c64-aaa1-d8bc2ac985c5" id="sec.669-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">about geothermal activities, other than wet geothermal production; or</txt></block></li><li guid="_68e5bdc7-9adc-4f74-b094-42fe1eac700d" id="sec.669-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">about an incidental activity under <intref check="valid" refid="sec.33" target.guid="_40d20d00-5908-4940-8068-947039fa8c08">section 33</intref>, <intref check="valid" refid="sec.112" target.guid="_731440f8-db42-45db-bf1c-fcf7ac5289b1">112</intref>, <intref check="valid" refid="sec.403" target.guid="_31221de2-cdfc-4596-80c1-d25e92caaa7a">403</intref> or <intref check="valid" refid="sec.442" target.guid="_fb266336-7dd4-4f18-bdb3-54760f449e65">442</intref>, or a stated pipeline licence incidental activity; or</txt></block></li><li guid="_3cd01022-431b-4161-945c-72ade613c582" id="sec.669-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">responsibilities and obligations of operators of operating plants or site safety managers in an overlapping area, including in relation to joint interaction management plans.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_9ec9077c-1b8d-45b7-b944-eba41cc7edb8" id="sec.669A" provision.type="other" spent.amends="0"><no>669A</no><heading guid="_fbf1deaf-a578-4649-8931-12843a6d6723" id="sec.669A-he">Regulation of gas devices and gas fittings</heading><subclause affected.by.uncommenced="0" guid="_037e9457-6b66-44f4-bdcb-0f746a453ad5" id="sec.669A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.669" target.guid="_6b7220f7-5c5d-49d9-8891-f3cd753d86b9">sections 669</intref> and <intref check="valid" refid="sec.859" target.guid="_4ddf675e-30f4-417c-9ed5-e99f7e6d41af">859</intref>, a regulation may provide for the certification or labelling of gas devices or gas fittings.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_18225f8e-03b3-49cf-9d50-2aaaf17cfb8a" id="sec.669A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A regulation under <intref check="valid" refid="sec.669A-ssec.1" target.guid="_037e9457-6b66-44f4-bdcb-0f746a453ad5">subsection (1)</intref>, may also provide for all or any of the following for gas devices or gas fittings—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7d35c274-9876-462a-93fb-45fbd042f35d" id="sec.669A-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">labelling for certification;</txt></block></li><li guid="_e76cb7d6-b63a-4bf3-ad8e-cfffe96e0dc8" id="sec.669A-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">energy efficiency labelling;</txt></block></li><li guid="_2cc336f3-717c-4d57-bf1c-9cf65b404836" id="sec.669A-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">approval or registration of labels;</txt></block></li><li guid="_4aef251e-fa41-4b32-a4b8-872a89958498" id="sec.669A-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">minimum energy performance standards;</txt></block></li><li guid="_5518a1f4-b831-429a-811c-8813861afc2d" id="sec.669A-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">selling or hiring;</txt></block></li><li guid="_ad78fb6d-f95c-41ab-9561-e23b4633d42d" id="sec.669A-ssec.2-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">offering, exposing or advertising for sale or hire.</txt></block></li></list></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_660b6931-295a-431a-8a33-6168aa4ee7f6" id="ch.9-pt.2"><no>Part 2</no><heading guid="_e836f845-c54d-41e0-87c1-ac5db9d8bf48" id="ch.9-pt.2-he">Safety management systems</heading><division affected.by.uncommenced="0" guid="_c9ff9882-1b37-455d-904b-22d267c4bc4f" id="ch.9-pt.2-div.1"><no>Division 1</no><heading guid="_718a6353-71ac-4531-9f9e-1f99501bf818" id="ch.9-pt.2-div.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_ca9c15a9-9ec2-415e-a6f6-8de0dd5edbf7" id="sec.670" provision.type="other" spent.amends="0"><no>670</no><heading guid="_b462dff7-07b9-4ea8-bf2c-721eb0aa8b86" id="sec.670-he">What is an <defterm guid="_160cc8b5-d508-4c82-831c-f87d5699f348" type="mention">operating plant</defterm></heading><subclause affected.by.uncommenced="0" guid="_497cecc1-2ca7-4157-a00f-81d688398f25" id="sec.670-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies subject to <intref check="valid" refid="sec.671" target.guid="_532966cf-6087-46c8-820d-863a71465356">section 671</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7c1ec3fa-8528-4d00-9ce3-6052aba5d47a" id="sec.670-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An <defterm guid="_e1d0727d-a913-43c3-a92e-3bbec2d772c4" id="sec.670-def.operatingplant-oc.2" type="definition">operating plant</defterm> is any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e86d0dbb-88ad-441c-9011-b5a4199dccd9" id="sec.670-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a facility used to explore for, produce or process petroleum, including machinery used for completing, maintaining, repairing, converting or decommissioning a petroleum well;</txt><note guid="_45e9d582-085f-4a0d-b8b6-6cd0f7509162" id="sec.670-ssec.2-para1.a-note" type="example"><heading guid="_4931a717-7987-4974-9e75-69eb7b970c1a" id="sec.670-ssec.2-para1.a-note-he">Example of machinery used for maintaining or repairing a petroleum well—</heading><block><txt break.before="1">machinery known in the petroleum and gas industry as a work over rig</txt></block></note></block></li><li guid="_d92afd4c-5838-4a06-baca-ab10bb942069" id="sec.670-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a facility that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a2521265-68ad-401f-8bc3-dc0b17ecc321" id="sec.670-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">is related to the exploration, production or processing of petroleum; and</txt></block></li><li guid="_81efab2d-4de7-4d4d-aa73-626eab65c0b9" id="sec.670-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">is used to take, interfere with or treat associated water and any petroleum incidentally collected with the water;</txt></block></li></list></block></li><li guid="_d382bdcd-812a-410b-af47-48ea71b0c096" id="sec.670-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a petroleum facility;</txt></block></li><li guid="_32972125-e921-475c-8b15-cb7d889cfc91" id="sec.670-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a pipeline authorised under a petroleum authority, other than a pipeline that transports only produced water without any petroleum;</txt></block></li><li guid="_c3896923-1ddf-4f62-81fe-ed3ccfb4c1b3" id="sec.670-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">a distribution pipeline;</txt></block></li><li guid="_55d08f78-2c91-478f-8020-ee7b15459542" id="sec.670-ssec.2-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">a distribution system;</txt></block></li><li change="del" guid="_23745b28-f463-469d-b9e5-907f34eb1534-del" id="sec.670-ssec.2-para1.g-del" provision.type="other"><no>(g)</no><block><txt break.before="0">a bulk fuel gas storage facility;</txt></block></li><li change="renumber" guid="_84b54619-638f-4582-a2ff-786778cb5a0b" id="sec.670-ssec.2-para1.g" provision.type="other"><no>(<del xml:space="preserve">h</del><ins xml:space="preserve">g</ins>)</no><block><txt break.before="0">a facility that is in the area of a geothermal tenure and is used for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_55f16790-1e73-482c-82ae-4927937759d7" id="sec.670-ssec.2-para1.g-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">geothermal exploration other than for wet geothermal production; or</txt></block></li><li guid="_9caafd36-2307-45aa-8696-d154dd0bd83e" id="sec.670-ssec.2-para1.g-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">geothermal production other than wet geothermal production;</txt></block></li></list><note guid="_d4b6d79f-1dda-4166-99cf-469195459749" id="sec.670-ssec.2-para1.g-note" type="example"><heading guid="_e1b0705b-5b20-42a8-9796-769237e7c49e" id="sec.670-ssec.2-para1.g-note-he">Examples—</heading><block><txt break.before="1">the following facilities if they are not used for wet geothermal production—</txt></block><block><list number.type="manual" unnumbered.indent="0"><li guid="_368e47b5-7cbb-4535-9a16-cfab44a229d5" id="sec.670-ssec.2-para1.g-note-para2" provision.type="other"><no>•</no><block><txt break.before="0">a drilling rig for a geothermal well</txt></block></li><li guid="_472e6177-a2c3-447e-888e-cb1dd55f7f7e" id="sec.670-ssec.2-para1.g-note-para2-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">equipment used for injecting into, maintaining or repairing a geothermal well</txt></block></li><li guid="_e814f95d-1f9c-4a65-bc66-8f7afce0a750" id="sec.670-ssec.2-para1.g-note-para2-oc.3" provision.type="other"><no>•</no><block><txt break.before="0">pipes and associated valves used in the geothermal production process</txt></block></li></list></block></note></block></li><li change="renumber" guid="_f94cafac-6d34-4e19-9f54-add21f7bd375" id="sec.670-ssec.2-para1.h" provision.type="other"><no>(<del xml:space="preserve">i</del><ins xml:space="preserve">h</ins>)</no><block><txt break.before="0">a facility that is in the area of a GHG authority and is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0c5de3d3-077b-4b2f-be90-4c38ce01ff10" id="sec.670-ssec.2-para1.h-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">used for GHG storage exploration or GHG stream storage; or</txt></block></li><li guid="_892682db-834b-4e22-bde7-47a5fa749f33" id="sec.670-ssec.2-para1.h-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">involved in GHG storage injection testing;</txt></block></li></list></block></li><li change="renumber" guid="_31ffbf74-d278-460b-b2e3-5c9449ef8b66" id="sec.670-ssec.2-para1.i" provision.type="other"><no>(<del xml:space="preserve">j</del><ins xml:space="preserve">i</ins>)</no><block><txt break.before="0">a GHG stream pipeline under the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref>;</txt></block></li><li change="renumber" guid="_b9ca5ff8-5340-4b17-bc24-7acc4aa3156d" id="sec.670-ssec.2-para1.j" provision.type="other"><no>(<del xml:space="preserve">k</del><ins xml:space="preserve">j</ins>)</no><block><txt break.before="0">a facility used to drill, complete, maintain, repair, convert or decommission an authorised water bore.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_582a6928-de52-45c1-ab37-96caced54215" id="sec.670-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, if a facility has, under a regulation under the <legref check="valid" jurisd="QLD" target.doc.id="act-2011-018" target.version.series="192711dc-f0de-4bcb-809d-080b81854cef" type="act"><name emphasis="yes">Work Health and Safety Act 2011</name></legref>, been classified as a major hazard facility, it is an operating plant only to the extent to which that Act does not apply to the facility.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8e645bed-7f18-4222-ae2f-c0dc5b0a59ff" id="sec.670-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0"><intref check="valid" refid="sec.670-ssec.2" target.guid="_7c1ec3fa-8528-4d00-9ce3-6052aba5d47a">Subsection (2)</intref> applies for a facility or pipeline even if it is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5e5f1013-8310-463c-9a78-6738db832b11" id="sec.670-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an on-site activity as defined under the <legref check="valid" jurisd="QLD" target.doc.id="act-1999-039" target.version.series="aa8f4811-7589-4cef-8731-c79d6cf94546" type="act"><name emphasis="no">Coal Mining Safety and Health Act</name></legref>; or</txt></block></li><li guid="_27ea9d3e-e471-49d0-929c-2b1ad5f500f2" id="sec.670-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an operation as defined under the <legref check="valid" jurisd="QLD" target.doc.id="act-1999-040" target.version.series="abae80d5-3c25-4219-a120-96b52ce5de2c" type="act"><name emphasis="yes">Mining and Quarrying Safety and Health Act 1999</name></legref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_69e2c6c8-6d45-4884-b79c-259f105afb6b" id="sec.670-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">An <defterm guid="_bcd9a4f7-8ff5-4019-9d89-c5ff70f516ec" id="sec.670-def.operatingplant-oc.3" type="definition">operating plant</defterm> is also a place, or a part of a place, at which a following activity is carried out, but only to the extent of the carrying out of the activity—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_64894dbf-c53e-4470-8f1e-bcfb93c8255c" id="sec.670-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0"><del xml:space="preserve">an LPG</del><ins xml:space="preserve">a fuel gas</ins> delivery network prescribed under a regulation;</txt></block></li><li change="del" guid="_fd481706-85c8-43e6-b3c1-e00e06e8a5b0-del" id="sec.670-ssec.5-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">tanker delivery of bulk fuel gas;</txt></block></li><li change="del" guid="_ece91b0a-969f-4cbe-916d-784cd454fd8c-del" id="sec.670-ssec.5-para1.c-del" provision.type="other"><no>(c)</no><block><txt break.before="0">cylinder storage at premises prescribed under a regulation;</txt></block></li><li change="renumber" guid="_709dea15-b101-4269-99d0-db642a313f92" id="sec.670-ssec.5-para1.b" provision.type="other"><no>(<del xml:space="preserve">d</del><ins xml:space="preserve">b</ins>)</no><block><txt break.before="0">an authorised activity under an authority if the activity is a geophysical survey for data acquisition;</txt></block></li><li change="renumber" guid="_52a7066d-561c-45eb-acbd-2938dc3d0ff6" id="sec.670-ssec.5-para1.c" provision.type="other"><no>(<del xml:space="preserve">da</del><ins xml:space="preserve">c</ins>)</no><block><txt break.before="0">an underground gasification activity;</txt></block></li><li change="renumber" guid="_6a875fe7-5646-429c-88cd-28d1aa12fece" id="sec.670-ssec.5-para1.d" provision.type="other"><no>(<del xml:space="preserve">e</del><ins xml:space="preserve">d</ins>)</no><block><txt break.before="0">another activity prescribed under a regulation and associated with the delivery, storage, transport, treatment or use of petroleum or fuel gas.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_71029d28-afec-43f6-b66e-bf422d0140e6" id="sec.670-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">An <defterm guid="_65388a80-a608-458f-bf7f-9c0540f68bf4" id="sec.670-def.operatingplant-oc.4" type="definition">operating plant</defterm> is also—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0eed2e7f-b0cd-421c-ab03-f42a32840d6f" id="sec.670-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">all of the authorised activities for a petroleum authority, geothermal tenure or GHG authority; or</txt></block></li><li guid="_47e73867-d8d2-41a0-9f00-1c54bf739a33" id="sec.670-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">all of the authorised activities for a mineral hydrocarbon mining lease that are not a coal mining operation or an on-site activity under the <legref check="valid" jurisd="QLD" target.doc.id="act-1999-039" target.version.series="aa8f4811-7589-4cef-8731-c79d6cf94546" type="act"><name emphasis="no">Coal Mining Safety and Health Act</name></legref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5c8852f3-19f0-44a0-b6ec-30ae5c8e49ba" id="sec.670-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">For <intref check="valid" refid="sec.670-ssec.6" target.guid="_71029d28-afec-43f6-b66e-bf422d0140e6">subsection (6)</intref><intref check="valid" refid="sec.670-ssec.6-para1.a" target.guid="_0eed2e7f-b0cd-421c-ab03-f42a32840d6f">(a)</intref> and <intref check="valid" refid="sec.670-ssec.6-para1.b" target.guid="_47e73867-d8d2-41a0-9f00-1c54bf739a33">(b)</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_338ac958-5171-476c-a413-32dfdfe0f495" id="sec.670-ssec.7-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the operating plant is all of the authorised activities jointly; and</txt></block></li><li guid="_c50d2ccf-d5e9-464b-b69a-659102c0651d" id="sec.670-ssec.7-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the authorised activities are an operating plant severally only if they are an operating plant under <intref check="valid" refid="sec.670-ssec.2" target.guid="_7c1ec3fa-8528-4d00-9ce3-6052aba5d47a">subsection (2)</intref> or <intref check="valid" refid="sec.670-ssec.5" target.guid="_69e2c6c8-6d45-4884-b79c-259f105afb6b">(5)</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ed171b1d-2195-4e09-af37-cfac76f94ba8" id="sec.670-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">To remove any doubt, for <intref check="valid" refid="sec.670-ssec.2" target.guid="_7c1ec3fa-8528-4d00-9ce3-6052aba5d47a">subsection (2)</intref> it is declared that the following are not an operating plant—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_525aff5f-eacd-40c0-9bae-f1e809e2dc15" id="sec.670-ssec.8-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a facility relating to geothermal energy to the extent any part of its processes happen after an isolation valve or distribution point where the pipeline transporting the energy ends at the entry to the facility;</txt></block></li><li guid="_c4e619fe-d859-459f-91b4-32b1633e4b33" id="sec.670-ssec.8-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a facility that produces a GHG stream at its source before the stream enters a GHG pipeline that transports the stream, or the stream is otherwise transported, to a GHG storage site under the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref>;</txt></block></li><li guid="_42df8b22-724f-4c64-82a4-a5b79ee04e3f" id="sec.670-ssec.8-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a facility mentioned in <intref check="valid" refid="sec.670-ssec.2" target.guid="_7c1ec3fa-8528-4d00-9ce3-6052aba5d47a">subsection (2)</intref>(<del xml:space="preserve"><intref check="valid" refid="sec.670-ssec.2-para1.k" target.guid="_b9ca5ff8-5340-4b17-bc24-7acc4aa3156d">k)</intref></del><ins xml:space="preserve">j)</ins> for an authorised water bore after either of the following happens—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5a1e190c-481c-4203-92ea-6308d1b47dd0" id="sec.670-ssec.8-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a transfer of the bore takes effect under <intref check="valid" refid="sec.288" target.guid="_f488a078-1654-4110-a6ea-4709e75ee7cc">section 288</intref> or the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.75Q" target.doc.id="act-1923-026" target.guid="_6b70c128-1c3e-4196-b673-42fab2f63894" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act">section 75Q</legref>;</txt></block></li><li guid="_0b3ee533-638b-4c04-8b41-b895ec4a027e" id="sec.670-ssec.8-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the bore is decommissioned and the relevant time for the bore under <intref check="valid" refid="sec.294" target.guid="_b1326749-a36f-43d9-a9a7-e177045010d0">section 294</intref><intref check="valid" refid="sec.294-ssec.2" target.guid="_4bd227c0-f993-4496-b90d-2491535b41f1">(2)</intref> or the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.75W" target.doc.id="act-1923-026" target.guid="_b5b7a9d9-5fd9-45d3-836c-b178207f958a" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act">section 75W</legref><legref check="invalid" jurisd="QLD" type="act">(2)</legref> passes.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_497a389f-a862-4fb0-af4f-b76b15090cb9" id="sec.670-ssec.9" provision.type="other"><no>(9)</no><block><txt break.before="0">A reference to an operating plant includes a reference to each stage of the plant that has commenced.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5dc1f2a4-f175-4148-b578-62a3591da06b" id="sec.670-ssec.10" provision.type="other"><no>(10)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_8c2eaf77-c4a0-4dc0-94fd-e0a6dbdeee65" id="sec.670-ssec.10-def.authorisedwaterbore_"><txt break.before="1"><defterm guid="_e462f5b8-3e03-4a55-87d6-07d602ff3a62" id="sec.670-ssec.10-def.authorisedwaterbore" type="definition">authorised water bore</defterm> means a water injection bore, water observation bore or water supply bore that a relevant holder or a person for the relevant holder—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_93a50b14-6e51-443a-a287-5dcd397c4bbb" id="sec.670-ssec.10-def.authorisedwaterbore-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">drills or converts under this Act or the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>; or</txt></block></li><li guid="_9c33290e-de2c-4d99-8b42-b824ffafd08b" id="sec.670-ssec.10-def.authorisedwaterbore-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">decommissions under this Act or the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_2bf54578-5806-4926-9ce6-8f15f0191979" id="sec.670-ssec.10-def.geothermalexploration_"><txt break.before="1"><defterm guid="_b966624f-0a3f-4ab1-ab09-680a2f4298fe" id="sec.670-ssec.10-def.geothermalexploration" type="definition">geothermal exploration</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.13" target.doc.id="act-2010-031" target.guid="_a7ec692f-2e6f-4152-a793-b74e4201df32" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act">section 13</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_08a1aa59-ead5-4f03-8c3e-6bdd9c074437" id="sec.670-ssec.10-def.geothermalwell_"><txt break.before="1"><defterm guid="_154013a7-183c-486e-b3a4-b61f13637d7c" id="sec.670-ssec.10-def.geothermalwell" type="definition">geothermal well</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref>, <legref check="invalid" jurisd="QLD" refid="sch.3" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act">schedule 3</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_c64f97d9-df1c-426e-8d8f-a2832716170f" id="sec.670-ssec.10-def.GHGstorageexploration_"><txt break.before="1"><defterm guid="_7524f9fb-4f9b-4e2e-91da-5d9fc440d03f" id="sec.670-ssec.10-def.GHGstorageexploration" type="definition">GHG storage exploration</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.15" target.doc.id="act-2009-003" target.guid="_04b46051-2b4b-4560-b9ae-98ffe19c1bbe" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act">section 15</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_add95a33-0554-4917-863e-f18fbe9b37d4" id="sec.670-ssec.10-def.GHGstorageinjectiontesting_"><txt break.before="1"><defterm guid="_e5539fcc-d8d1-4a11-9272-47cc7ca79ace" id="sec.670-ssec.10-def.GHGstorageinjectiontesting" type="definition">GHG storage injection testing</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.16" target.doc.id="act-2009-003" target.guid="_cfee6ff8-573b-4720-a2f5-0b4560578b63" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act">section 16</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_f25f428f-9236-40d6-990d-fd055a36d869" id="sec.670-ssec.10-def.petroleumauthority_"><txt break.before="1"><defterm guid="_74752c14-9276-4e6a-a76f-878a6673d8e3" id="sec.670-ssec.10-def.petroleumauthority" type="definition">petroleum authority</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7eb78c5a-af5a-47da-9feb-4b90e74ce82f" id="sec.670-ssec.10-def.petroleumauthority-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a petroleum authority under <intref check="valid" refid="sec.18" target.guid="_00606342-13a2-49f5-a337-6c1f809e1f2e">section 18</intref><intref check="valid" refid="sec.18-ssec.2" target.guid="_3adfe92d-b344-428c-a5b7-9599d1993a99">(2)</intref>; or</txt></block></li><li guid="_f0408e04-a104-49bd-b368-447e50401b0d" id="sec.670-ssec.10-def.petroleumauthority-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an authority to prospect, petroleum lease, or water monitoring authority, under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_ff5562e0-5646-4dd6-8dab-46fc8b42e4d5" id="sec.670-ssec.10-def.relevantholder_"><txt break.before="1"><defterm guid="_6d73440e-c8a7-43d2-87c4-7380da0fc8c5" id="sec.670-ssec.10-def.relevantholder" type="definition">relevant holder</defterm> means the holder of a petroleum tenure, water monitoring authority, <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> petroleum tenure or water monitoring authority under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_532966cf-6087-46c8-820d-863a71465356" id="sec.671" provision.type="other" spent.amends="0"><no>671</no><heading guid="_419f11f6-4604-49cf-9ad5-1a057d4554a6" id="sec.671-he">Limitation for facility or pipeline included in coal mining operation</heading><subclause affected.by.uncommenced="0" guid="_b71c86d8-b3f0-415d-9d92-5b381104b7d6" id="sec.671-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies for a facility or pipeline that is, or is part of, a coal mining operation or an on-site activity under the <legref check="valid" jurisd="QLD" target.doc.id="act-1999-039" target.version.series="aa8f4811-7589-4cef-8731-c79d6cf94546" type="act"><name emphasis="no">Coal Mining Safety and Health Act</name></legref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bfade78b-bc24-48c2-bf96-5eb620b1b5ff" id="sec.671-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The facility or pipeline is an operating plant only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9acfaaf1-a2c9-437f-a073-e96a69c83cdf" id="sec.671-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">it is used to explore for, extract, produce, process, release or transport coal seam gas (the <defterm guid="_1567075f-2701-416b-a51f-811bbe309c44" id="sec.671-ssec.2-def.activity" type="definition">activity</defterm>); and</txt></block></li><li guid="_54479c42-d7b3-46d6-b793-52bcb99f8e9f" id="sec.671-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">one of the following applies—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_133512d3-5ace-46ba-886e-0e81ecdb44f4" id="sec.671-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the activity is carried out under a mineral hydrocarbon mining lease; or</txt></block></li><li guid="_7779fe53-0b34-47c6-a901-00fa45e8ea97" id="sec.671-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the person who holds the mining lease, the area of which includes the area on which the activity is carried out, also holds a petroleum lease the area of which includes the area; or</txt></block></li><li guid="_8e96935a-8543-4b18-8d6f-1b0c46fa48a5" id="sec.671-ssec.2-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the activity is carried out under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.318CN" target.doc.id="act-1989-110" target.guid="_a3879f50-6ebc-40cf-afe4-cd740fdd22de" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 318CN</legref>.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_cfdfa1cc-71d9-43c4-9f21-d61109bed394" id="sec.671-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">An operating plant mentioned in <intref check="valid" refid="sec.671-ssec.2" target.guid="_bfade78b-bc24-48c2-bf96-5eb620b1b5ff">subsection (2)</intref> is a <defterm guid="_b6c3b4c0-f258-4f70-b8bf-1c47cb5e42db" id="sec.671-def.coalminingCSGoperatingplant" type="definition">coal mining-CSG operating plant</defterm>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_cb887025-604f-4c49-8d75-5d45252e2165" id="sec.672" provision.type="other" spent.amends="0"><no>672</no><heading guid="_f55ead7c-8846-4367-a741-3ce891b160f5" id="sec.672-he">What is a <defterm guid="_4fae4abb-7d99-4f5c-a0a9-af640d3cf973" type="mention">stage</defterm> of an operating plant</heading><subclause affected.by.uncommenced="0" guid="_95c7f4e6-45b4-4182-a313-308f3f263ce1" id="sec.672-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A <defterm guid="_b84179a9-2799-42ad-9f14-a428053ce095" id="sec.672-def.stage-oc.2" type="definition">stage</defterm>, of an operating plant, means any of the following for the plant—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4d37aa5f-cfc8-4f06-aa98-1c0b3c084319" id="sec.672-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">commissioning;</txt></block></li><li guid="_c80454fa-3d04-4854-b3b0-50eca6aeb182" id="sec.672-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">operation;</txt></block></li><li guid="_b4c5fbb4-7d77-48cf-bf47-9755660969ec" id="sec.672-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">maintenance or modification;</txt></block></li><li guid="_e140563c-a127-472e-9d2a-9e3cd0f0d748" id="sec.672-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">decommissioning.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_895cce04-699e-4dcc-9ab1-79e6fbaa0413" id="sec.672-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A <defterm guid="_8aaba680-281f-4a50-bdc1-8310c23bbd37" id="sec.672-def.stage-oc.3" type="definition">stage</defterm>, of an operating plant, also includes construction work for an operating plant or proposed operating plant if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1a43f70b-76ef-4d39-9063-7a448c627e78" id="sec.672-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the work is within or part of an existing operating plant; or</txt></block></li><li guid="_747f8dfa-7d8b-403c-83ef-c8407d4b828d" id="sec.672-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the work is adjacent to existing operating plant and the safety management system for the plant provides that the system applies to the work; or</txt></block></li><li guid="_ffe0e895-e2f5-4555-864a-fc78aeb219c2" id="sec.672-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the work is the process called ‘rigging up and down’ of a drill rig and any associated plant or equipment required for the operation of the rig.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e43ae51f-18e7-4ccb-8c84-1ab892c45eb3" id="sec.673" provision.type="other" spent.amends="0"><no>673</no><heading guid="_cbd1c1f3-c1f9-42af-8a13-6f3f021ed2f8" id="sec.673-he">Who is the <defterm guid="_7ecfd931-68ca-4b2b-92d8-c7da401d2104" type="mention">operator</defterm> of an operating plant</heading><subclause affected.by.uncommenced="0" guid="_2811989b-96c1-42d1-9d58-14ffc5ee1730" id="sec.673-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section provides for who is the <defterm guid="_ef5aa7cd-20fc-4bce-bf06-190f50aef629" id="sec.673-def.operator-oc.2" type="definition">operator</defterm> of an operating plant.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_24c56e17-a455-45c9-92d5-85dda7e15872" id="sec.673-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For a coal mining-CSG operating plant, the operator is the relevant site senior executive under the <legref check="valid" jurisd="QLD" target.doc.id="act-1999-039" target.version.series="aa8f4811-7589-4cef-8731-c79d6cf94546" type="act"><name emphasis="no">Coal Mining Safety and Health Act</name></legref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_eefe359f-9755-46be-aa3d-8e4cb25758ca" id="sec.673-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Otherwise, the operator is the person who is responsible for managing and ensuring the safe operation of the plant.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_65a05e6b-c886-4663-ba39-edb7880daf60" id="ch.9-pt.2-div.2"><no>Division 2</no><heading guid="_7f4c077f-3066-4e83-820a-26d5d34b1676" id="ch.9-pt.2-div.2-he">Operator’s obligations</heading><note guid="_aca01027-c42e-46a0-98f1-172d7e3577ff" id="ch.9-pt.2-div.2-note" type="example"><heading guid="_2c0667ff-a4ad-4005-8bad-174ae6742d30" id="ch.9-pt.2-div.2-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.694" target.guid="_7f4ca860-a24d-4172-aca1-015c44bcda5c">section 694</intref>.</txt></block></note><clause affected.by.uncommenced="0" guid="_52e15d93-fce0-4c51-847d-6082d601e7de" id="sec.674" provision.type="other" spent.amends="0"><no>674</no><heading guid="_fcc6ec4d-e575-4c6f-ac3e-c8328dae6b4d" id="sec.674-he">Requirement to have safety management system</heading><subclause affected.by.uncommenced="0" guid="_f7d6659b-438d-4382-a98c-16a03372b1bf" id="sec.674-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of an operating plant must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7aa21f9a-4564-4c7c-b754-8879c2760411" id="sec.674-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for each stage of the plant, make or adopt a safety management system that complies with—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_335a279c-307f-4585-bbda-0d8c51b291db" id="sec.674-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0"><intref check="valid" refid="sec.675" target.guid="_28bc8c66-267c-4d67-9a55-97f681bdb4b3">section 675</intref>; and</txt></block></li><li guid="_49d37d8f-29da-4d81-a565-612eade780f5" id="sec.674-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the plant is used to explore for, extract, produce or release petroleum within coal seams—<intref check="valid" refid="sec.705C" target.guid="_0d8ca067-2468-476e-810e-9f48381c0f9b">section 705C</intref>; and</txt></block></li></list></block></li><li guid="_26a73513-7f58-4911-bb08-72806750a8d9" id="sec.674-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">implement and maintain the system.</txt></block></li></list></block><penalty guid="_90e2497a-8e91-4488-b055-7023d8dde574" id="sec.674-ssec.1-pen"><block><txt break.before="1">Maximum penalty—1,500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_30a6b647-3099-4973-8008-c4265254052d" id="sec.674-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The operator of an operating plant must not begin a stage of the plant unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_effa308d-9efa-4db4-a65f-bd725d500b16" id="sec.674-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the operator has made or adopted a safety management system that applies to the stage; and</txt></block></li><li guid="_289c87bc-01de-45f6-922e-3e6d677af152" id="sec.674-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the system complies with <intref check="valid" refid="sec.675" target.guid="_28bc8c66-267c-4d67-9a55-97f681bdb4b3">section 675</intref>; and</txt></block></li><li guid="_adad8cd5-bdb1-47b3-989a-9fc1764f6557" id="sec.674-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the plant is used to explore for, extract, produce or release petroleum within coal seams—the system complies with <intref check="valid" refid="sec.705C" target.guid="_0d8ca067-2468-476e-810e-9f48381c0f9b">section 705C</intref>.</txt></block></li></list></block><penalty guid="_0788d3be-f472-4a39-a075-8f9a824b2f97" id="sec.674-ssec.2-pen"><block><txt break.before="1">Maximum penalty—1,000 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_6c52b614-086c-48f4-a8b5-28932bd6bcb6" id="sec.674-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A safety management system may apply to more than 1 operating plant.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8e9b8fe3-6d97-42a6-9001-64f00d352871" id="sec.674-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, the system must still comply with <intref check="valid" refid="sec.675" target.guid="_28bc8c66-267c-4d67-9a55-97f681bdb4b3">section 675</intref> in relation to each operating plant to which the system applies.</txt><note guid="_c3fba8b2-7ffc-4dfd-bd89-4877ea006183" id="sec.674-ssec.4-note" type="example"><heading guid="_08a1f6e7-ae50-46d4-97b7-b8b4f5f53767" id="sec.674-ssec.4-note-he">Note—</heading><block><txt break.before="1">For coal mining-CSG operating plant, see <intref check="valid" refid="ch.9-pt.2-div.4" target.guid="_06c5e91a-8138-4f11-8422-e7131138bd68">division 4</intref> (Special provisions for safety management systems for coal mining-CSG operating plant).</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_23b77cb0-eed5-4e25-ab6e-047e710626ef" id="sec.674-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Also, if <intref check="valid" refid="ch.9" target.guid="_e115e3d8-9707-4c5d-b3e6-be71f8d522ee">chapter 9</intref>, <intref check="valid" refid="ch.9-pt.4" target.guid="_feccc805-854d-490d-9644-dd7ef21961d9">part 4</intref>, <intref check="valid" refid="ch.9-pt.4-div.5" target.guid="_3ccd9143-f883-4790-8d0d-2f2006c5ce9b">division 5</intref>, <intref check="valid" refid="ch.9-pt.4-div.5-sdiv.1" target.guid="_871b13c6-0132-4ee8-8f83-05a6329f2dbf">subdivision 1</intref> applies for an operating plant, the safety management system must include a joint interaction management plan.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_28bc8c66-267c-4d67-9a55-97f681bdb4b3" id="sec.675" provision.type="other" spent.amends="0"><no>675</no><heading guid="_68490cbc-654d-458e-9732-55ec598fb5c6" id="sec.675-he">Content requirements for safety management systems</heading><subclause affected.by.uncommenced="0" guid="_3c49bcf7-0714-4d0b-b845-2b74352af01a" id="sec.675-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A safety management system for an operating plant must include details of each of the following to the extent they are appropriate for the plant—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d8ac1f8e-d0e0-45de-845d-d5afdd4892a4" id="sec.675-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a description of the plant, its location and operations;</txt></block></li><li guid="_39739fa1-200d-4c18-bd6f-7e5db8320e58" id="sec.675-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">organisational safety policies;</txt></block></li><li guid="_26bc7047-0c56-4965-a199-7c704d3454dd" id="sec.675-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">organisational structure and safety responsibilities;</txt></block></li><li guid="_4d6f4a5b-c7f2-4d7e-9212-9896143faad8" id="sec.675-ssec.1-para1.ca" provision.type="other"><no>(ca)</no><block><txt break.before="0">for an operating plant, other than a coal mining–CSG operating plant—the operator of the plant;</txt></block></li><li guid="_9cd858c8-dee1-4677-b6a5-d2f36bdc1a44" id="sec.675-ssec.1-para1.cb" provision.type="other"><no>(cb)</no><block><txt break.before="0">for each site mentioned in <intref check="valid" refid="sec.675-ssec.1-para1.ca" target.guid="_4d6f4a5b-c7f2-4d7e-9212-9896143faad8">paragraph (ca)</intref>—the site safety manager;</txt></block></li><li guid="_f478efd1-0336-4968-9d0b-72f9dbe396e1" id="sec.675-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">each site at the plant for which a site safety manager is required;</txt></block></li><li guid="_0389fea6-af93-4dfe-a37d-529e73e4abfe" id="sec.675-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">a formal safety assessment consisting of the systematic assessment of risk and a description of the technical and other measures undertaken, or to be undertaken, to control the identified risk;</txt></block></li><li guid="_71cd6cff-5643-43d6-9327-b3d74dca6529" id="sec.675-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">if there is proposed, or there is likely to be, interaction with other operating plant or contractors in the same vicinity, or if there are multiple operating plant with different operators on the same petroleum tenure, geothermal tenure or GHG authority—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0eb8dc49-6a30-4c28-858f-a615b7611eaa" id="sec.675-ssec.1-para1.f-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a description of the proposed or likely interactions, and how they will be managed; and</txt></block></li><li guid="_f9fc1c01-b28d-4342-ac57-16afa426f5b5" id="sec.675-ssec.1-para1.f-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">an identification of the specific risks that may arise as a result of the proposed or likely interactions, and how the risks will be controlled; and</txt></block></li><li guid="_a8933028-011d-4e50-b88f-2cad3ee5fa59" id="sec.675-ssec.1-para1.f-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">an identification of the safety responsibilities of each operator;</txt></block></li></list></block></li><li guid="_3871c5b3-7d20-4841-a82f-5c37fbbe7447" id="sec.675-ssec.1-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">a skills assessment identifying the minimum skills, knowledge, competencies and experience requirements for each person to carry out specific work;</txt></block></li><li guid="_475bed0e-0a3e-4595-9c96-865c800f4be3" id="sec.675-ssec.1-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">a training and supervision program containing the mechanism for imparting the skills, knowledge, competencies and experience identified in <intref check="valid" refid="sec.675-ssec.1-para1.g" target.guid="_3871c5b3-7d20-4841-a82f-5c37fbbe7447">paragraph (g)</intref> and assessing new skills, monitoring performance and ensuring ongoing retention of skill levels;</txt></block></li><li guid="_92d8b330-c6a6-42d7-8a0c-00f17dae09a8" id="sec.675-ssec.1-para1.i" provision.type="other"><no>(i)</no><block><txt break.before="0">safety standards and standard operating and maintenance procedures applied, or to be applied, in each stage of the plant;</txt></block></li><li guid="_21a558fd-69b5-4576-9aae-adc1ad4028cb" id="sec.675-ssec.1-para1.j" provision.type="other"><no>(j)</no><block><txt break.before="0">control systems, including, for example, alarm systems, temperature and pressure control systems, and emergency shutdown systems;</txt></block></li><li guid="_50880182-f706-4a5f-b22a-50a9f95ada48" id="sec.675-ssec.1-para1.k" provision.type="other"><no>(k)</no><block><txt break.before="0">machinery and equipment relating to, or that may affect, the safety of the plant;</txt></block></li><li guid="_001971e0-69a3-45b2-9e5a-2bf32817b491" id="sec.675-ssec.1-para1.l" provision.type="other"><no>(l)</no><block><txt break.before="0">emergency equipment, preparedness and procedures;</txt></block></li><li guid="_5aec3798-ab77-4f95-ae53-c7e12f137b35" id="sec.675-ssec.1-para1.m" provision.type="other"><no>(m)</no><block><txt break.before="0">communication systems including, for example, emergency communication systems;</txt></block></li><li guid="_fe3b79db-8492-4e94-a99e-0e55abe48a8d" id="sec.675-ssec.1-para1.ma" provision.type="other"><no>(ma)</no><block><txt break.before="0">a process for managing change including a process for managing any changes to plant, operating procedures, organisational structure, personnel and the safety management system;</txt></block></li><li guid="_5e9ae4d9-974b-44da-a58b-34b23d7b181a" id="sec.675-ssec.1-para1.n" provision.type="other"><no>(n)</no><block><txt break.before="0">the mechanisms for implementing, monitoring and reviewing and auditing safety policies and safety management systems;</txt></block></li><li guid="_a04ee0b2-3073-46dd-b7aa-a24833a5fe06" id="sec.675-ssec.1-para1.p" provision.type="other"><no>(p)</no><block><txt break.before="0">key performance indicators to be used to monitor compliance with the system and this Act;</txt></block></li><li guid="_0d353498-bb89-4c80-bb79-1614c68bae3f" id="sec.675-ssec.1-para1.q" provision.type="other"><no>(q)</no><block><txt break.before="0">mechanisms for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5857ea5c-cf46-4bbf-aa3b-c7d6d29062c9" id="sec.675-ssec.1-para1.q-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">recording, investigating and reviewing incidents at the plant; and</txt></block></li><li guid="_20ec79f9-07b7-4caa-854a-4117085226d0" id="sec.675-ssec.1-para1.q-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">implementing recommendations from an investigation or review of an incident at the plant;</txt></block></li></list></block></li><li guid="_03251855-b8a1-432b-bcff-da05765d9638" id="sec.675-ssec.1-para1.r" provision.type="other"><no>(r)</no><block><txt break.before="0">record management, including, for example, all relevant approvals, certificates of compliance and other documents required under this Act;</txt></block></li><li guid="_74bddfcf-ac09-499c-8011-febed9be024a" id="sec.675-ssec.1-para1.s" provision.type="other"><no>(s)</no><block><txt break.before="0">to the extent that, because of the <legref check="valid" jurisd="QLD" target.doc.id="act-2011-018" target.version.series="192711dc-f0de-4bcb-809d-080b81854cef" type="act"><name emphasis="yes">Work Health and Safety Act 2011</name></legref>, <legref check="valid" jurisd="QLD" refid="sch.1" target.doc.id="act-2011-018" target.guid="_ce65143c-1f5b-47fb-9955-174d16e6a3e0" target.version.series="192711dc-f0de-4bcb-809d-080b81854cef" type="act">schedule 1</legref>, <legref check="invalid" jurisd="QLD" type="act">part 2</legref>, <legref check="valid" jurisd="QLD" refid="sch.1" target.doc.id="act-2011-018" target.guid="_ce65143c-1f5b-47fb-9955-174d16e6a3e0" target.version.series="192711dc-f0de-4bcb-809d-080b81854cef" type="act">division 1</legref>, that Act does not apply to a place or installation at the plant, details, including codes and standards adopted, addressing all relevant requirements under that Act that would, other than for that section, apply;</txt></block></li><li guid="_afc7a2e2-a414-46d2-b699-87904d100ce0" id="sec.675-ssec.1-para1.t" provision.type="other"><no>(t)</no><block><txt break.before="0">if the operating plant is a major hazard facility under the <legref check="valid" jurisd="QLD" target.doc.id="sl-2011-0240" target.version.series="898d0b1d-19a0-42c7-8f37-9b5418db7da0" type="subordleg"><name emphasis="yes">Work Health and Safety Regulation 2011</name></legref>—each matter not mentioned in <intref check="valid" refid="sec.675-ssec.1-para1.b" target.guid="_39739fa1-200d-4c18-bd6f-7e5db8320e58">paragraphs (b)</intref> to <intref check="valid" refid="sec.675-ssec.1-para1.r" target.guid="_03251855-b8a1-432b-bcff-da05765d9638">(r)</intref> that is mentioned in <intref check="invalid" refid="sch.16">schedule 16</intref>, <intref check="invalid" refid="sch.17">17</intref> or <intref check="invalid" refid="sch.18">18</intref> of that regulation;</txt></block></li><li guid="_eae08908-e041-42fb-8d5a-c110aae81e94" id="sec.675-ssec.1-para1.u" provision.type="other"><no>(u)</no><block><txt break.before="0">another matter prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a39ace9f-19e4-4b9d-96b8-0a146d4bfd92" id="sec.675-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, details, or full details, of a matter mentioned in <intref check="valid" refid="sec.675-ssec.1" target.guid="_3c49bcf7-0714-4d0b-b845-2b74352af01a">subsection (1)</intref> need not be included in the system if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a0a47125-9674-41d7-9674-6ca3a8e6ab01" id="sec.675-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">because of the nature, size or type of the operating plant, it is inappropriate to include the details; and</txt></block></li><li guid="_385ebc72-fe23-4af0-a51a-146904bf4811" id="sec.675-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the system—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c5968716-cd9c-4ef4-a52d-2c2cfba82ba1" id="sec.675-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">complies with each relevant safety requirement or, if there is no relevant safety requirement for the matter, other accepted industry practices for the matter; and</txt></block></li><li guid="_bc2d9989-f7c4-4c85-a578-8ac545cb7a3f" id="sec.675-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">states why it is inappropriate to include the details.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7f5e2118-421d-4b62-9906-5bd769e2a8a7" id="sec.675-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the description of operating plant includes a description of pipeline that transports produced water, the description must identify—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d77120f6-4287-402e-b152-0e6980d5cc55" id="sec.675-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">which, if any, pipelines transport produced water together with petroleum; and</txt></block></li><li guid="_7c76f287-ccae-41a8-92ff-047a02c0e00d" id="sec.675-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a distinguishable part of the pipeline from which the pipeline would be free from petroleum.</txt><note guid="_807379c6-b97b-4b8f-ac42-7e570165c3f7" id="sec.675-ssec.3-para1.b-note" type="example"><heading guid="_89b61b81-b48e-49e3-abfb-79c02e53d749" id="sec.675-ssec.3-para1.b-note-he">Example for <intref check="valid" refid="sec.675-ssec.3-para1.b" target.guid="_7c76f287-ccae-41a8-92ff-047a02c0e00d">paragraph (b)</intref>—</heading><block><txt break.before="1">isolation valve or an inlet to a water treatment plant</txt></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_bdb27141-2dff-44bd-ae69-a31ecac87b6a" id="sec.675-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A formal safety assessment under <intref check="valid" refid="sec.675-ssec.1" target.guid="_3c49bcf7-0714-4d0b-b845-2b74352af01a">subsection (1)</intref><intref check="valid" refid="sec.675-ssec.1-para1.e" target.guid="_0389fea6-af93-4dfe-a37d-529e73e4abfe">(e)</intref>, must, as far as practicable, state ways to control risks associated with the operating plant to an acceptable level by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_df25480d-9a59-45c9-81bf-d15696a757b9" id="sec.675-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">eliminating or minimising hazards at the plant; and</txt></block></li><li guid="_f78ea701-4e9c-46e4-9412-f0a4613cad25" id="sec.675-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">implementing measures to minimise the likelihood, and limit the consequences, of significant incidents at the plant.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_00507cd0-7490-4426-9b16-651b8acf7072" id="sec.675-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_dec3d4f0-3026-4720-9ca3-cd7afdbdf016" id="sec.675-ssec.5-def.distinguishablepart_"><txt break.before="1"><defterm guid="_729e06fc-8017-47de-8fb1-8b2ad5bf9e0c" id="sec.675-ssec.5-def.distinguishablepart" type="definition">distinguishable part</defterm>, of a pipeline, does not include a mere length of pipe.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_78c6a4fc-adda-4505-ad0c-94254c38a3f9" id="sec.675A" provision.type="other" spent.amends="0"><no>675A</no><heading guid="_5eaff068-45d8-49a9-9919-770e6b6f4929" id="sec.675A-he">Generic safety management systems</heading><subclause affected.by.uncommenced="0" guid="_0e7435bb-a67b-4032-813a-7d86ce30d252" id="sec.675A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">For each stage of an operating plant, the operator of the plant is taken to have a safety management system that complies with <intref check="valid" refid="sec.675" target.guid="_28bc8c66-267c-4d67-9a55-97f681bdb4b3">section 675</intref> if the operator adopts a generic SMS for that stage.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a482d840-1995-491e-ab21-3854293e2dcd" id="sec.675A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.675A-ssec.1" target.guid="_0e7435bb-a67b-4032-813a-7d86ce30d252">subsection (1)</intref> does not apply for a stage of a plant if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4454ae44-ffb7-4b07-b766-bffea3176594" id="sec.675A-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the chief inspector considers that, because of the complexity of the plant or the particular risks associated with the plant, the generic SMS does not sufficiently manage the level of risk at the plant for the stage; and</txt></block></li><li guid="_616f550c-37fc-4719-89f9-a253de6e985b" id="sec.675A-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the chief inspector gives the operator a written notice stating that the safety management system for the plant must comply with <intref check="valid" refid="sec.675" target.guid="_28bc8c66-267c-4d67-9a55-97f681bdb4b3">section 675</intref> for the stage.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b9e9907e-6f7c-4ec6-95e2-5bdd70018bf1" id="sec.675A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_257cf79e-59c6-441b-9a16-9c704d99454e" id="sec.675A-ssec.3-def.genericSMS_"><txt break.before="1"><defterm guid="_d9e63ed2-a216-4d7a-8424-05090516b7b5" id="sec.675A-ssec.3-def.genericSMS" type="definition">generic SMS</defterm>, for a stage of an operating plant (the <defterm guid="_7c864a4f-bbb4-4e63-ba26-cde2b01b8b9a" id="sec.675A-ssec.3-def.relevantplant" type="definition">relevant plant</defterm>), means a system in the form of a safety management system that is prescribed under a regulation for the stage of an operating plant of the same type as the relevant plant.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2bf16c58-6938-48f2-a1ae-57dac9be4f56" id="sec.676" provision.type="other" spent.amends="0"><no>676</no><heading guid="_95b1706b-3769-492f-8941-f118595d321e" id="sec.676-he">Publication of and access to safety management system</heading><subclause affected.by.uncommenced="0" guid="_6ea40a7d-00cb-499d-9069-7e2529fa5685" id="sec.676-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of an operating plant must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_18fc95a6-ac45-414d-9490-38209f93d26d" id="sec.676-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">whenever the plant is operating, keep a copy of the safety management system for the plant or the part of the system relevant to the plant, open for inspection—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bdc80677-847b-4bf2-8802-f5bc56ce471a" id="sec.676-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">at the plant; or</txt></block></li><li guid="_5f363d3e-074a-4d8c-98b7-6a0e524856c5" id="sec.676-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if because of the nature, size or type of the plant it is impracticable to keep it at the plant—at another place where it is reasonable to have it open for inspection; and</txt></block></li></list></block></li><li guid="_4a2e4ffb-1050-4380-9437-ff6bbdc34b6a" id="sec.676-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">display, and keep displayed, in a conspicuous place at the plant where it can be easily read by anyone to whom the system, or part of the system, may apply, a notice stating where the copy of the system is open for inspection; and</txt></block></li><li guid="_cf093dd8-033a-42df-bdc6-54c678ce1326" id="sec.676-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">ensure each person who has an obligation under the system is told they have an obligation under the system within a reasonable period before the system requires them to comply with the obligation.</txt></block></li></list></block><penalty guid="_d113c995-4846-4cc8-99a3-40f1b1317deb" id="sec.676-ssec.1-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_5604c929-8d82-47fe-92b9-147896073c05" id="sec.676-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_3a31ac6f-69e0-44de-8cda-12a89fb09e22" id="sec.676-ssec.2-def.openforinspection_"><txt break.before="1"><defterm guid="_c0637769-e073-4204-ab80-2731c2cc83db" id="sec.676-ssec.2-def.openforinspection" type="definition">open for inspection</defterm> means open for inspection by anyone to whom the system, or part of the system, may apply.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b1e0e6bc-df7e-40d5-80db-d12a53fbdaf1" id="sec.677" provision.type="other" spent.amends="0"><no>677</no><heading guid="_6a66d339-4f15-4a6a-8b4b-9078034e1515" id="sec.677-he">Operator responsible for compliance with safety management system</heading><subclause affected.by.uncommenced="0" guid="_99328879-20d9-469b-bc1c-4a7e93800e58" id="sec.677-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of an operating plant must take all reasonable steps to ensure everyone who has an obligation under the safety management system for the plant complies with their obligations under the system.</txt></block><penalty guid="_35135a51-39a0-45c9-8210-b4d8294231e3" id="sec.677-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_79276a3e-22e0-441b-b2d3-399537890e73" id="sec.677-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Evidence that another person has been convicted of an offence against <intref check="valid" refid="sec.702" target.guid="_d93bd1bd-797a-4a8e-8834-12549e2a37b5">section 702</intref> is evidence that the operator committed the offence of failing to take all reasonable steps to ensure the other person complies with their obligations under the system.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_5866f51f-4c62-40b8-8825-15676b967ab1" id="sec.678" provision.type="other" spent.amends="0"><no>678</no><heading guid="_f02283ca-d6e5-49f3-81f6-07a71c1cc18f" id="sec.678-he">When safety management system must be revised</heading><subclause affected.by.uncommenced="0" guid="_c17b45d6-f688-4dac-a7d6-95271f805d30" id="sec.678-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of an operating plant must revise the safety management system for the plant if any of the following make the revision appropriate—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fcda6f54-7591-4aec-b730-edce0b6aee2b" id="sec.678-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the making or amendment of a safety code, safety requirement or a standard;</txt></block></li><li guid="_7d9de8fe-d6b6-4fdb-81b1-2ea183cf08e5" id="sec.678-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the happening of an event relevant to the plant of which the operator is aware, or ought reasonably to have been aware;</txt><note guid="_9025722b-8080-4c06-8c9a-3f87497ef038" id="sec.678-ssec.1-para1.b-note" type="example"><heading guid="_3cade542-799a-4592-b7c7-6d5d86e0e50f" id="sec.678-ssec.1-para1.b-note-he">Examples of an event—</heading><block><txt break.before="1">a development in technical knowledge or hazard assessment</txt></block></note></block></li><li guid="_8f642e48-b8ff-4fdd-ac30-5efd72316cae" id="sec.678-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">changes or proposed changes to the plant that could result in an increase in the overall risk levels, or a specific risk level, for the plant.</txt></block></li></list></block><penalty guid="_0c27bfc3-4c6d-4b72-b63c-b551c80ff420" id="sec.678-ssec.1-pen"><block><txt break.before="1">Maximum penalty—1,500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_d3b83081-667a-444d-b745-8321a4b0e16e" id="sec.678-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_ad874667-d06a-488e-9436-abd9760e4606" id="sec.678-ssec.2-def.revise_"><txt break.before="1"><defterm guid="_7b686691-ab17-4be3-b0af-b3d97d4cedd1" id="sec.678-ssec.2-def.revise" type="definition">revise</defterm> means amend or remake.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_84d3f6ce-3e45-49b4-a5ca-df4156ce997a" id="sec.678A" provision.type="other" spent.amends="0"><no>678A</no><heading guid="_415d884b-bd3d-4659-abbe-fc6eca5fa587" id="sec.678A-he">Requirement to have resulting records for safety management system</heading><subclause affected.by.uncommenced="0" guid="_d97677ec-8ba3-418c-a3be-c179139c30df" id="sec.678A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of an operating plant must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_966945e4-af87-4c9a-a502-c990da301052" id="sec.678A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">ensure resulting records for the safety management system for the plant are made and kept for a period of 7 years; and</txt></block></li><li guid="_755cdddf-5f7a-4f76-bc50-48fa6639fada" id="sec.678A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whenever the plant is operating, keep a copy of the resulting records open for inspection—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_35150444-7402-4cb3-9f75-220143f5d3ed" id="sec.678A-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">at the plant; or</txt></block></li><li guid="_4e7d2ea9-e487-4b1c-9736-d291e4ba3ecd" id="sec.678A-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if because of the nature, size or type of the plant it is impracticable to keep the records at the plant—at another place where it is reasonable to have the records open for inspection.</txt></block></li></list></block></li></list></block><penalty guid="_49852f11-52a7-452b-94ae-ef3d09891306" id="sec.678A-ssec.1-pen"><block><txt break.before="1">Maximum penalty—1,500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_d1f14c71-a1df-4900-9b73-70dd7b613a4b" id="sec.678A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_e57e98c7-e2dd-4109-9eeb-f5555fe4e375" id="sec.678A-ssec.2-def.resultingrecords_"><txt break.before="1"><defterm guid="_fda2fe4b-ad1a-426d-b76e-acd922f2c4b4" id="sec.678A-ssec.2-def.resultingrecords" type="definition">resulting records</defterm>, for a safety management system for an operating plant, means all of the following records that are appropriate for the plant, demonstrating that the safety management system has been implemented and monitored—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_979b29af-884f-4d67-ad3d-ec0a52c46eef" id="sec.678A-ssec.2-def.resultingrecords-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">records about carrying out a formal safety assessment mentioned in <intref check="valid" refid="sec.675" target.guid="_28bc8c66-267c-4d67-9a55-97f681bdb4b3">section 675</intref><intref check="valid" refid="sec.675-ssec.1" target.guid="_3c49bcf7-0714-4d0b-b845-2b74352af01a">(1)</intref><intref check="valid" refid="sec.675-ssec.1-para1.e" target.guid="_0389fea6-af93-4dfe-a37d-529e73e4abfe">(e)</intref>;</txt></block></li><li guid="_0bf44204-f390-41c6-b61f-7b598b0682ae" id="sec.678A-ssec.2-def.resultingrecords-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">records about carrying out a skills assessment mentioned in <intref check="valid" refid="sec.675" target.guid="_28bc8c66-267c-4d67-9a55-97f681bdb4b3">section 675</intref><intref check="valid" refid="sec.675-ssec.1" target.guid="_3c49bcf7-0714-4d0b-b845-2b74352af01a">(1)</intref><intref check="valid" refid="sec.675-ssec.1-para1.g" target.guid="_3871c5b3-7d20-4841-a82f-5c37fbbe7447">(g)</intref>;</txt></block></li><li guid="_fa415ae4-bcf7-46e0-979c-1e8419e5118a" id="sec.678A-ssec.2-def.resultingrecords-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">records about carrying out a training and supervision program mentioned in <intref check="valid" refid="sec.675" target.guid="_28bc8c66-267c-4d67-9a55-97f681bdb4b3">section 675</intref><intref check="valid" refid="sec.675-ssec.1" target.guid="_3c49bcf7-0714-4d0b-b845-2b74352af01a">(1)</intref><intref check="valid" refid="sec.675-ssec.1-para1.h" target.guid="_475bed0e-0a3e-4595-9c96-865c800f4be3">(h)</intref>;</txt></block></li><li guid="_573cdd7f-cbed-4aef-a4d4-39f875bece13" id="sec.678A-ssec.2-def.resultingrecords-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">records about how and when standard operating and maintenance procedures were applied;</txt></block></li><li guid="_ea713945-ae68-4b4d-8674-315eb97c5a7d" id="sec.678A-ssec.2-def.resultingrecords-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">records about the maintenance of machinery and equipment relating to, or that may affect, the safety of the plant;</txt></block></li><li guid="_458635c7-2b4a-45a2-97c5-c3ee5ddcbfb5" id="sec.678A-ssec.2-def.resultingrecords-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">records about implementing, monitoring and reviewing and auditing safety policies and safety management systems;</txt></block></li><li guid="_01b19028-66bb-4ce8-95bf-3e057bfb4626" id="sec.678A-ssec.2-def.resultingrecords-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">records of investigating and reviewing incidents at the plant;</txt></block></li><li guid="_17a1a04d-da73-4578-800f-15a2c7c24602" id="sec.678A-ssec.2-def.resultingrecords-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">records about the implementation of recommendations from an investigation or review of an incident at the plant;</txt></block></li><li guid="_4a0ed6d8-07a8-4606-b596-992a1f5fee78" id="sec.678A-ssec.2-def.resultingrecords-para1.i" provision.type="other"><no>(i)</no><block><txt break.before="0">records about testing and monitoring control systems;</txt></block></li><li guid="_59b1d056-9479-4523-941c-ff83b6d24ce8" id="sec.678A-ssec.2-def.resultingrecords-para1.ia" provision.type="other"><no>(ia)</no><block><txt break.before="0">records about the details of the operator mentioned in <intref check="valid" refid="sec.675" target.guid="_28bc8c66-267c-4d67-9a55-97f681bdb4b3">section 675</intref><intref check="valid" refid="sec.675-ssec.1" target.guid="_3c49bcf7-0714-4d0b-b845-2b74352af01a">(1)</intref><intref check="valid" refid="sec.675-ssec.1-para1.c" target.guid="_26bc7047-0c56-4965-a199-7c704d3454dd">(c)</intref> and the site safety manager mentioned in <intref check="valid" refid="sec.675" target.guid="_28bc8c66-267c-4d67-9a55-97f681bdb4b3">section 675</intref><intref check="valid" refid="sec.675-ssec.1" target.guid="_3c49bcf7-0714-4d0b-b845-2b74352af01a">(1)</intref><intref check="valid" refid="sec.675-ssec.1-para1.cb" target.guid="_9cd858c8-dee1-4677-b6a5-d2f36bdc1a44">(cb)</intref>;</txt></block></li><li guid="_6cfeffb9-a08e-437b-9849-de448fea208a" id="sec.678A-ssec.2-def.resultingrecords-para1.j" provision.type="other"><no>(j)</no><block><txt break.before="0">records, prescribed under a regulation, about a matter prescribed under <intref check="valid" refid="sec.675" target.guid="_28bc8c66-267c-4d67-9a55-97f681bdb4b3">section 675</intref><intref check="valid" refid="sec.675-ssec.1" target.guid="_3c49bcf7-0714-4d0b-b845-2b74352af01a">(1)</intref><intref check="valid" refid="sec.675-ssec.1-para1.u" target.guid="_eae08908-e041-42fb-8d5a-c110aae81e94">(u)</intref>.</txt></block></li></list></definition></deflist></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_8cb8c072-2670-4b5e-95c2-4a08a64cf6f9" id="ch.9-pt.2-div.3"><no>Division 3</no><heading guid="_8f7cf5d2-1be9-4fd1-a6fe-e1d9587c2410" id="ch.9-pt.2-div.3-he">Validation of safety management systems</heading><clause affected.by.uncommenced="0" guid="_976042fb-cbe0-4221-8b93-4e97b0f404d8" id="sec.679" provision.type="other" spent.amends="0"><no>679</no><heading guid="_3f64ff9c-560e-474b-83eb-64efffc8146a" id="sec.679-he">Notice by chief inspector</heading><subclause affected.by.uncommenced="0" guid="_fdee22e1-cb36-4127-8d85-e965c61077ab" id="sec.679-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the chief inspector reasonably believes a safety management system for an operating plant, or an aspect of the system—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0d7ace8e-de84-4c0a-bed2-53f8b4ba9278" id="sec.679-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">does not comply with <intref check="valid" refid="sec.675" target.guid="_28bc8c66-267c-4d67-9a55-97f681bdb4b3">section 675</intref>; or</txt></block></li><li guid="_d5cb8bbe-664f-4323-9aaa-954f30357f9f" id="sec.679-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is insufficient to ensure an acceptable level of risk at the plant; or</txt></block></li><li guid="_55e32947-2b6f-46b3-bdb3-104ffc5038ba" id="sec.679-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">must be revised under <intref check="valid" refid="sec.678" target.guid="_5866f51f-4c62-40b8-8825-15676b967ab1">section 678</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5d21bb1b-071c-413e-a60a-084c0655f4bb" id="sec.679-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief inspector must give the operator of the plant notice (a <defterm guid="_048ad7aa-a8be-4c78-9276-d7804ca1ba56" id="sec.679-def.validationnotice" type="definition">validation notice</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_822cf713-eb7c-41b1-a862-c8c15cafcf02" id="sec.679-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">stating the belief, and the reasons for it; and</txt></block></li><li guid="_2ca1011a-7422-42c7-9a91-33305e508571" id="sec.679-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">requiring the operator within a stated reasonable period to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bba4f2e5-4b08-4690-861f-e71ef26cd634" id="sec.679-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">amend the system so that it complies with <intref check="valid" refid="sec.675" target.guid="_28bc8c66-267c-4d67-9a55-97f681bdb4b3">section 675</intref>, or, if appropriate, revise the system under <intref check="valid" refid="sec.678" target.guid="_5866f51f-4c62-40b8-8825-15676b967ab1">section 678</intref>, and give the chief inspector notice that the system has been so amended or revised; or</txt></block></li><li guid="_e2b7711e-be7a-41eb-ae0a-4d0c490fe4b5" id="sec.679-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">lodge submissions as to why the system complies with the section.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a80c287c-3f6f-4a91-b518-7f40b952e46c" id="sec.679-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The validation notice may state how the chief inspector considers the system should be amended.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1c635bcc-e91b-4e21-81a1-cb6cb6fec511" id="sec.679-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The operator must comply with the validation notice.</txt></block><penalty guid="_328f1df7-8106-4955-926b-7fedb70b59c1" id="sec.679-ssec.4-pen"><block><txt break.before="1">Maximum penalty for <intref check="valid" refid="sec.679-ssec.4" target.guid="_1c635bcc-e91b-4e21-81a1-cb6cb6fec511">subsection (4)</intref>—1,500 penalty units.</txt></block></penalty></subclause></clause><clause affected.by.uncommenced="0" guid="_4815e464-f134-45b0-91b2-8f95b776254b" id="sec.680" provision.type="other" spent.amends="0"><no>680</no><heading guid="_9cb98e7b-be95-42a6-abec-431dd2337eae" id="sec.680-he">Considering submissions</heading><subclause affected.by.uncommenced="0" guid="_519289b2-266d-43c5-8f12-ffb2b02d6ec6" id="sec.680-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, within the period stated in a notice given, under <intref check="valid" refid="sec.679" target.guid="_976042fb-cbe0-4221-8b93-4e97b0f404d8">section 679</intref><intref check="valid" refid="sec.679-ssec.2" target.guid="_5d21bb1b-071c-413e-a60a-084c0655f4bb">(2)</intref>, to an operator, the operator lodges a submission under that section.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c805dabd-aa3c-4b09-b78c-eab39bb37412" id="sec.680-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief inspector must consider the submission.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_884c22ba-66ce-4c70-853d-8e91daa8c948" id="sec.680-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the chief inspector decides the system does comply or does not need to be revised, the chief inspector must give the operator notice of the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_767e30f1-8136-4cb8-ba8d-d36c45b9d4bb" id="sec.681" provision.type="other" spent.amends="0"><no>681</no><heading guid="_278db301-79bb-4af6-9505-0aaed283b6ba" id="sec.681-he">Revision notice</heading><subclause affected.by.uncommenced="0" guid="_f0c1b04a-8d7b-42ef-8a23-f1d1d173e702" id="sec.681-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, after complying with <intref check="valid" refid="sec.680" target.guid="_4815e464-f134-45b0-91b2-8f95b776254b">section 680</intref>, the chief inspector still believes the relevant safety management system does not comply with <intref check="valid" refid="sec.675" target.guid="_28bc8c66-267c-4d67-9a55-97f681bdb4b3">section 675</intref> or must be revised under <intref check="valid" refid="sec.678" target.guid="_5866f51f-4c62-40b8-8825-15676b967ab1">section 678</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_98a1779e-b9c9-4933-a434-ca63005e3cef" id="sec.681-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief inspector may give the operator notice (the <defterm guid="_592db767-a96b-436f-a834-d00d834755c3" id="sec.681-def.revisionnotice" type="definition">revision notice</defterm>) requiring the operator to amend or remake the safety management system so that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5b261533-137c-4d3a-8988-cf50262aae56" id="sec.681-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">it complies with <intref check="valid" refid="sec.675" target.guid="_28bc8c66-267c-4d67-9a55-97f681bdb4b3">section 675</intref>; and</txt></block></li><li guid="_7d2971fe-7a21-4cec-9c93-de76eba0684a" id="sec.681-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the chief inspector believes it must be revised under <intref check="valid" refid="sec.678" target.guid="_5866f51f-4c62-40b8-8825-15676b967ab1">section 678</intref>—the revision is made.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_13b8ea45-1202-46d2-9259-b035a751e682" id="sec.681-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The revision notice must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c5bea209-c444-435c-9f50-34fd49102760" id="sec.681-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">state how the chief inspector believes the safety management system does not comply with <intref check="valid" refid="sec.675" target.guid="_28bc8c66-267c-4d67-9a55-97f681bdb4b3">section 675</intref> or must be revised under <intref check="valid" refid="sec.678" target.guid="_5866f51f-4c62-40b8-8825-15676b967ab1">section 678</intref>; and</txt></block></li><li guid="_9f86ae4c-c2ed-47b0-a4fe-089db446f5a2" id="sec.681-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state a period within which the operator must comply with the revision notice; and</txt></block></li><li guid="_9d81a0c5-6d40-4ae3-bec0-6178ffaf2fb9" id="sec.681-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">be accompanied by, or include, an information notice about the decisions to give the revision notice and to fix the stated period.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e685a4b7-c8b6-4b17-a73e-cea515837471" id="sec.681-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The operator must comply with the revision notice.</txt></block><penalty guid="_dacff856-466b-4e86-bf82-9dbdeb5de3a6" id="sec.681-ssec.4-pen"><block><txt break.before="1">Maximum penalty for <intref check="valid" refid="sec.681-ssec.4" target.guid="_e685a4b7-c8b6-4b17-a73e-cea515837471">subsection (4)</intref>—1,500 penalty units.</txt></block></penalty></subclause></clause><clause affected.by.uncommenced="0" guid="_73f0c269-7c6e-497f-aa01-36a82e9c607d" id="sec.682" provision.type="other" spent.amends="0"><no>682</no><heading guid="_8162f99c-1e08-4af8-a614-8246cf04e2ed" id="sec.682-he">Other inspector’s powers not affected</heading><block><txt break.before="1">The giving of a notice under this division does not limit or otherwise affect an inspector’s powers under this Act.</txt></block></clause></division><division affected.by.uncommenced="0" guid="_06c5e91a-8138-4f11-8422-e7131138bd68" id="ch.9-pt.2-div.4"><no>Division 4</no><heading guid="_907c6dd6-4041-4ac2-84e0-6288aa336ca5" id="ch.9-pt.2-div.4-he">Special provisions for safety management systems for coal mining-CSG operating plant</heading><clause affected.by.uncommenced="0" guid="_c1b5ece9-65d6-4f56-b114-4be9909f4415" id="sec.683" provision.type="other" spent.amends="0"><no>683</no><heading guid="_11dc4c81-96a6-41c8-910b-27c1e76ab83c" id="sec.683-he">Application of <intref check="valid" refid="ch.9-pt.2-div.4" target.guid="_06c5e91a-8138-4f11-8422-e7131138bd68">div 4</intref></heading><block><txt break.before="1">This division applies for a coal mining-CSG operating plant if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_697f2eef-fc70-4c58-9997-f708893bb399" id="sec.683-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the operator of the operating plant has a safety and health management system for, or that includes, the operating plant; and</txt></block></li><li guid="_ce385219-11a6-434e-949f-86f64cd33699" id="sec.683-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the system complies with—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8d314ec2-3b1f-4598-ace9-b55fbe9666f1" id="sec.683-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1999-039" target.version.series="aa8f4811-7589-4cef-8731-c79d6cf94546" type="act"><name emphasis="no">Coal Mining Safety and Health Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.62" target.doc.id="act-1999-039" target.guid="_07d25edf-10de-403a-9115-b12ffdc10642" target.version.series="aa8f4811-7589-4cef-8731-c79d6cf94546" type="act">section 62</legref>; and</txt></block></li><li guid="_27506037-bca7-4cbb-a3d5-c800695e1fad" id="sec.683-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the content requirements under <intref check="valid" refid="sec.675" target.guid="_28bc8c66-267c-4d67-9a55-97f681bdb4b3">section 675</intref> for a safety management system.</txt></block></li></list></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_bfb19330-c88d-4dd2-a95c-1a61252579e9" id="sec.684" provision.type="other" spent.amends="0"><no>684</no><heading guid="_04a013b5-a8f0-4202-a7e8-331c34d6fd0a" id="sec.684-he">Integration with safety and health management system</heading><subclause affected.by.uncommenced="0" guid="_732a6de0-6a23-468c-9b99-fdba975064b1" id="sec.684-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of the operating plant is taken to have complied with <intref check="valid" refid="sec.674" target.guid="_52e15d93-fce0-4c51-847d-6082d601e7de">sections 674</intref> and <intref check="valid" refid="sec.678" target.guid="_5866f51f-4c62-40b8-8825-15676b967ab1">678</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_67c1779f-3299-431e-aaf5-ef7b20daaadd" id="sec.684-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The safety and health management system is taken to be, or include, the safety management system for the plant.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e69607cf-5bc8-430d-94bc-81c2a0bb070d" id="sec.685" provision.type="other" spent.amends="0"><no>685</no><heading guid="_2d8dac10-d2dd-45d0-a7b5-e9d37ce08294" id="sec.685-he">Alternative compliance with <intref check="valid" refid="sec.676" target.guid="_2bf16c58-6938-48f2-a1ae-57dac9be4f56">s 676</intref></heading><block><txt break.before="1">The operator of coal mining-CSG operating plant is taken to have complied with <intref check="valid" refid="sec.676" target.guid="_2bf16c58-6938-48f2-a1ae-57dac9be4f56">section 676</intref> if the operator complies with the <legref check="valid" jurisd="QLD" target.doc.id="act-1999-039" target.version.series="aa8f4811-7589-4cef-8731-c79d6cf94546" type="act"><name emphasis="no">Coal Mining Safety and Health Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.62" target.doc.id="act-1999-039" target.guid="_07d25edf-10de-403a-9115-b12ffdc10642" target.version.series="aa8f4811-7589-4cef-8731-c79d6cf94546" type="act">section 62</legref><legref check="invalid" jurisd="QLD" type="act">(4)</legref> and <legref check="invalid" jurisd="QLD" type="act">(5)</legref>.</txt></block></clause><clause affected.by.uncommenced="0" guid="_09aa273a-7ae5-4a89-b54a-b8c9700425ec" id="sec.686" provision.type="other" spent.amends="0"><no>686</no><heading guid="_d835f3bd-9906-42bc-8bcd-1da55a7486c7" id="sec.686-he">Restriction on application of <intref check="valid" refid="ch.9-pt.2-div.3" target.guid="_8cb8c072-2670-4b5e-95c2-4a08a64cf6f9">div 3</intref></heading><block><txt break.before="1">The chief inspector can only give a notice under <intref check="valid" refid="ch.9-pt.2-div.3" target.guid="_8cb8c072-2670-4b5e-95c2-4a08a64cf6f9">division 3</intref> for the parts of the safety and health management system directly affecting the operation of the operating plant.</txt></block></clause></division></part><part affected.by.uncommenced="0" guid="_d8eab8e6-f654-4978-a528-33b336504a1c" id="ch.9-pt.3"><no>Part 3</no><heading guid="_63ed89fa-a252-43ce-9698-d06b666f1139" id="ch.9-pt.3-he">Safety positions and information notice</heading><division affected.by.uncommenced="0" guid="_ca031202-bccf-4f25-94e1-18a7ed1b7b39" id="ch.9-pt.3-div.1"><no>Division 1</no><heading guid="_17058a17-9a4c-4a72-bf1b-e6898a1591df" id="ch.9-pt.3-div.1-he">Executive safety manager</heading><clause affected.by.uncommenced="0" guid="_efc82e86-c2c8-449e-a4ad-0d7bd783d87d" id="sec.687" provision.type="other" spent.amends="0"><no>687</no><heading guid="_485e40a8-81f5-4170-af19-21f758ad6920" id="sec.687-he">Who is the <defterm guid="_67076e25-b11d-4562-a861-82893631ccc9" type="mention">executive safety manager</defterm> of an operating plant</heading><subclause affected.by.uncommenced="0" guid="_8673a468-a5b7-4e1b-b0b2-899fca7df57d" id="sec.687-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section provides for who is the <defterm guid="_d0340dd7-4d74-41d9-a9d4-96cd16b67d08" id="sec.687-def.executivesafetymanager-oc.2" type="definition">executive safety manager</defterm> for an operating plant.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_87a9d72d-d4fe-4918-8012-48f8da4764ed" id="sec.687-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For authorised activities for a petroleum authority, geothermal tenure or GHG authority that, under <intref check="valid" refid="sec.670" target.guid="_ca9c15a9-9ec2-415e-a6f6-8de0dd5edbf7">section 670</intref><intref check="valid" refid="sec.670-ssec.6" target.guid="_71029d28-afec-43f6-b66e-bf422d0140e6">(6)</intref><intref check="valid" refid="sec.670-ssec.6-para1.a" target.guid="_0eed2e7f-b0cd-421c-ab03-f42a32840d6f">(a)</intref> and <intref check="valid" refid="sec.670-ssec.7" target.guid="_5c8852f3-19f0-44a0-b6ec-30ae5c8e49ba">(7)</intref>, are jointly an operating plant, the executive safety manager is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2f680c34-5423-4dc9-9546-31193a475cfb" id="sec.687-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the holder of the authority or tenure is an individual—the holder; or</txt></block></li><li guid="_762563dc-c71b-418a-9241-d0fedd1889c1" id="sec.687-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the senior managing officer of the corporation or organisation responsible for the management and safe operation of the authorised activities for the authority or tenure.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_fa778dcd-90ff-4369-bd4f-daf46587a797" id="sec.687-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For a coal mining-CSG operating plant, the executive safety manager is the site senior executive appointed under the <legref check="valid" jurisd="QLD" target.doc.id="act-1999-039" target.version.series="aa8f4811-7589-4cef-8731-c79d6cf94546" type="act"><name emphasis="no">Coal Mining Safety and Health Act</name></legref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a47435e7-f6a9-4571-a300-0d0d52f34f5e" id="sec.687-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Otherwise, the executive safety manager is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0f1ef180-d60f-4631-ade5-08d9a137db95" id="sec.687-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the operator is an individual—the operator; or</txt></block></li><li guid="_7a4e3cb4-1449-4ab2-9088-7f1e8b1b1c9d" id="sec.687-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the senior managing officer of the corporation or organisation responsible for the management and safe operation of the operating plant.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_01e6858f-c4e8-4ca5-8ee7-f5ff946917de" id="sec.687-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_d8eeaf82-41fa-4c96-b529-8b1962fc38fa" id="sec.687-ssec.5-def.seniormanagingofficer_"><txt break.before="1"><defterm guid="_54fab1f8-229d-468e-b20c-e40dfb4926ad" id="sec.687-ssec.5-def.seniormanagingofficer" type="definition">senior managing officer</defterm>, of a corporation or organisation, means the person in Australia who is the most senior officer (however called) of the corporation or organisation in Australia responsible for managing the corporation or organisation.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e12a6ef0-ad9b-4757-8f5e-547dfc8f8410" id="sec.687A" provision.type="other" spent.amends="0"><no>687A</no><heading guid="_7d41c6e1-da2e-456a-b237-7fa8496a9b96" id="sec.687A-he">Requirement of joint holders to give information about executive safety manager</heading><subclause affected.by.uncommenced="0" guid="_43235522-1756-4057-8b8a-95f7daa0fab2" id="sec.687A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_08c47160-5529-48d1-87a1-ef7dd71c5168" id="sec.687A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">there is more than 1 holder of a petroleum authority, geothermal tenure or GHG tenure; and</txt></block></li><li guid="_a7946204-d21a-4b39-832e-02d8749d967a" id="sec.687A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">1 or more of the holders is a corporation; and</txt></block></li><li guid="_0fffc457-bdb8-44f2-b8ec-eb167382e4d3" id="sec.687A-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">operating plant is being operated or is proposed to be operated in the authority’s or tenure’s area.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5df16f25-19b3-46e5-bfd9-f8672bc08a5d" id="sec.687A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The holders must ensure the chief inspector is given a notice stating which corporation or organisation is responsible for the management and safe operation of operating plant in the area.</txt></block><penalty guid="_a539cbec-a69f-4e78-82d6-00b69de5362f" id="sec.687A-ssec.2-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_36fe8447-a2b4-4d2f-985c-0d6de03ded95" id="sec.687A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In a proceeding under or in relation to this Act, the notice is evidence of which corporation or organisation is responsible for the management and safe operation of operating plant in the area.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_866b286e-5641-4e33-b039-3f312ccb9208" id="sec.688" provision.type="other" spent.amends="0"><no>688</no><heading guid="_f4c939ff-0464-4d4f-9a3b-d73feb1d00b6" id="sec.688-he">Executive safety manager’s general obligations</heading><subclause affected.by.uncommenced="0" guid="_bd055f41-b489-4d55-9316-d01c85f07d93" id="sec.688-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The executive safety manager of an operating plant must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c95ca1ab-4185-4fb0-9e8b-61ff3a3c0d09" id="sec.688-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the operator is a corporation—nominate an individual as a representative of the operator to give and receive information for the operator under this Act; and</txt></block></li><li guid="_ca4ef0fc-4023-40b0-ad1c-e6b5d87abd2b" id="sec.688-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">ensure the operator of the plant has, for each stage of the plant, a system that is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1d05c8a1-011c-4d89-b932-ec42bd9537ba" id="sec.688-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a safety management system for the plant made under <intref check="valid" refid="sec.674" target.guid="_52e15d93-fce0-4c51-847d-6082d601e7de">section 674</intref><intref check="valid" refid="sec.674-ssec.1" target.guid="_f7d6659b-438d-4382-a98c-16a03372b1bf">(1)</intref><intref check="valid" refid="sec.674-ssec.1-para1.a" target.guid="_7aa21f9a-4564-4c7c-b754-8879c2760411">(a)</intref> after consultation with the workers at the plant; or</txt></block></li><li guid="_db127c57-d891-4ec1-a5f6-92a8e9003ebd" id="sec.688-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a generic SMS adopted for the plant; and</txt></block></li></list></block></li><li guid="_366ab8fa-c56e-4632-a6fc-65f838d23f7b" id="sec.688-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">approve the system before it is put into effect; and</txt></block></li><li guid="_db75ae09-c326-4665-8f2d-57d246c59e4b" id="sec.688-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">ensure the system is implemented in a way that effectively manages the risks associated with the plant.</txt></block></li></list></block><penalty guid="_6c2b3415-f4e3-4822-a399-d0edfdd15e14" id="sec.688-ssec.1-pen"><block><txt break.before="1">Maximum penalty—2,000 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_acc3ecf9-54ef-4e1a-b7a7-1bc8f3d5de57" id="sec.688-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">To remove any doubt, it is declared that— </txt><list number.type="manual" unnumbered.indent="0"><li guid="_1e31df80-b4ca-4bac-9344-afb1c6cd8ef8" id="sec.688-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a nomination of an operator’s representative under <intref check="valid" refid="sec.688-ssec.1" target.guid="_bd055f41-b489-4d55-9316-d01c85f07d93">subsection (1)</intref><intref check="valid" refid="sec.688-ssec.1-para1.a" target.guid="_c95ca1ab-4185-4fb0-9e8b-61ff3a3c0d09">(a)</intref> does not affect an obligation imposed on the operator under this Act; and</txt></block></li><li guid="_f1eca10d-aa96-4639-aaae-63db97da3264" id="sec.688-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any information given to or by an operator’s representative is taken to have been given to or by the operator.</txt></block></li></list></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_b3ee0bba-bf3b-4283-86e6-225d8d37d0e0" id="ch.9-pt.3-div.2"><no>Division 2</no><heading guid="_fb87b530-ef43-4b4f-8aba-7f7197aea9fb" id="ch.9-pt.3-div.2-he">Site safety manager</heading><clause affected.by.uncommenced="0" guid="_97044840-77d2-4acc-9c85-8ad4f4899e42" id="sec.692" provision.type="other" spent.amends="0"><no>692</no><heading guid="_7b424995-0b56-43ed-adf1-e2d5a6820c33" id="sec.692-he">Site safety manager</heading><subclause affected.by.uncommenced="0" guid="_238803af-37bc-4459-8b81-e19e746e128c" id="sec.692-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the safety management system for an operating plant requires a site safety manager for a site at the plant, the operator of the plant must appoint an appropriately qualified person as the site safety manager for the site.</txt></block><penalty guid="_df944cc6-a8b3-460b-80f6-2bc72d3e1df1" id="sec.692-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_7a348605-7a32-482f-a770-28564e577d3f" id="sec.692-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief inspector may give the operator of an operating plant a notice directing the operator to, within a stated reasonable period, appoint 1 or more appropriately qualified persons as a site safety manager for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_78bb3693-7bbb-485b-a153-803d3288bb82" id="sec.692-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a stated site at the plant; or</txt></block></li><li guid="_a60a8460-fa8c-4ddc-83ca-c59a305a18f0" id="sec.692-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a stated activity at a stated site at the plant.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_dc6bb860-2540-485f-b152-d5ffffac321f" id="sec.692-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The operator must comply with the notice.</txt></block><penalty guid="_a57411ce-846c-46d2-b952-0958c8fa2299" id="sec.692-ssec.3-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_f8eb17a0-fcab-4102-bb89-96eb28194916" id="sec.692-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">More than 1 person may be appointed as a site safety manager for a site at an operating plant.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_9a52fa7d-c2e2-4677-823c-f9555f270472" id="sec.693" provision.type="other" spent.amends="0"><no>693</no><heading guid="_ce1c0ee8-6ee1-4e09-8009-ee0f2ff3d04c" id="sec.693-he">Site safety manager’s obligations</heading><block><txt break.before="1">The site safety manager for a site at an operating plant must take all reasonable steps to ensure—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bdb37699-9b6c-44b8-bf3e-f0ccea686356" id="sec.693-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">each person who enters the site is given an appropriate induction that enables the person to comply with <intref check="valid" refid="sec.702" target.guid="_d93bd1bd-797a-4a8e-8834-12549e2a37b5">section 702</intref>; and</txt><note guid="_489b4a7e-3327-48f8-a659-47dcafcb6c22" id="sec.693-para1.a-note" type="example"><heading guid="_c9ca5f1d-9066-4482-94b0-748995299602" id="sec.693-para1.a-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.699" target.guid="_da62968d-8e0b-4b13-a140-d092e9f1f16e">section 699</intref> (General obligation to keep risk to acceptable level).</txt></block></note></block></li><li guid="_b99ad475-bd99-4629-9f2c-7b255bb4daa8" id="sec.693-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">each person at the site complies with standard operating procedures, emergency response procedures and other measures necessary for the safety of the site and the person; and</txt></block></li><li guid="_f5e8eb42-09e1-42a8-840c-051863d8688c" id="sec.693-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">each person working at the site performs their functions safely and follows standard operating procedures for the plant; and</txt></block></li><li guid="_3ab2134c-5221-4f0e-85e0-0781b34c86d7" id="sec.693-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">necessary first aid, safety and other like equipment that is appropriate for the likely hazards of the site is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7ba5ccac-1cf2-4bb1-a48e-ef26bd1a05bb" id="sec.693-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">available for use; and</txt></block></li><li guid="_17b55ab6-ca31-43f8-91fb-c92c255b3f85" id="sec.693-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">adequately maintained; and</txt></block></li><li guid="_b37253cf-2edb-49ee-8e71-f43bcc626b88" id="sec.693-para1.d-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">reasonably available to anyone authorised to be on the site; and</txt></block></li></list></block></li><li guid="_ef88d398-e0c4-4685-aa38-4102e125a8ad" id="sec.693-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">relevant staff are trained in first aid, emergency and other general safety procedures.</txt></block></li></list></block><penalty guid="_bf97ef80-1e43-4567-9c15-b9b46a259048" id="sec.693-pen"><block><txt break.before="1">Maximum penalty—1,000 penalty units.</txt></block></penalty></clause><clause affected.by.uncommenced="0" guid="_7f4ca860-a24d-4172-aca1-015c44bcda5c" id="sec.694" provision.type="other" spent.amends="0"><no>694</no><heading guid="_1b31fc78-9b42-4662-9194-2adf0fbe6d37" id="sec.694-he">Default site safety manager</heading><subclause affected.by.uncommenced="0" guid="_8514b471-6f8e-4987-b051-d9e90c1d30b1" id="sec.694-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if no-one has been appointed as the site safety manager for a site at an operating plant.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_df69d3ee-4eed-41d2-80f3-526558e286bd" id="sec.694-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The site safety manager for the site is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5b7d7660-4a8b-4b28-9ce4-a429db97246d" id="sec.694-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the operator is an individual—the operator; or</txt></block></li><li guid="_a83ad4de-371a-410e-a921-4083e4f3a2dc" id="sec.694-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the operator is a corporation—the executive safety manager of the operating plant.</txt></block></li></list></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_a849a903-f7a7-419d-8b9f-3d13e1eff403" id="ch.9-pt.3-div.3"><no>Division 3</no><heading guid="_441e8a6b-6c53-48b6-b8d7-9a2b1b0d2eec" id="ch.9-pt.3-div.3-he">Information notices</heading><clause affected.by.uncommenced="0" guid="_877be727-cf36-4cae-979d-fa6a3acd7aaf" id="sec.694A" provision.type="other" spent.amends="0"><no>694A </no><heading guid="_7d439989-8b53-44f7-9c18-9d25fdb27fd5" id="sec.694A-he">Executive safety manager and operator to give information notices</heading><subclause affected.by.uncommenced="0" guid="_1c98deb1-67dc-411c-b684-06e7cb325fba" id="sec.694A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The executive safety manager of an operating plant must give the chief inspector a notice stating who is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0c953e71-4154-44fe-8ed8-0f2b34d42d15" id="sec.694A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the operator; and</txt></block></li><li guid="_3b0c8f50-96a2-40ca-8929-a9f68271b1af" id="sec.694A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the executive safety manager; and</txt></block></li><li guid="_ab87c8d2-96cb-4f79-bf33-089c716b7d4d" id="sec.694A-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the operator is a corporation, the representative of the operator.</txt></block></li></list></block><penalty guid="_8f72f797-d1fb-4b47-83c2-02cd55fb03d6" id="sec.694A-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_e76b80a3-97f4-4072-831e-a8839c342e93" id="sec.694A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The operator of an operating plant must give the chief inspector a notice stating the information prescribed by regulation about the operating plant.</txt></block><penalty guid="_06e20f42-dcdb-46e8-a736-b8203c19f5bc" id="sec.694A-ssec.2-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_67d95c3e-710a-40a1-bb88-6d318fdf172c" id="sec.694A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For <intref check="valid" refid="sec.694A-ssec.2" target.guid="_e76b80a3-97f4-4072-831e-a8839c342e93">subsection (2)</intref>, a regulation may prescribe information that is necessary for ensuring and promoting the safety of the operating plant.</txt><note guid="_8a8b6f22-4f0d-44d9-8a4f-cf0fb1228c43" id="sec.694A-ssec.3-note" type="example"><heading guid="_02ef3cc1-9aa5-41f8-b4f4-cf1b4afacc8b" id="sec.694A-ssec.3-note-he">Examples of information for ensuring and promoting the safety of an operating plant—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_6115008d-da7e-496d-8d48-d4f3febef1c3" id="sec.694A-ssec.3-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">a description of the operating plant including the operating plant’s location and nature and extent of activities </txt></block></li><li guid="_78c969c0-290e-42cd-883b-c2a1c48aef90" id="sec.694A-ssec.3-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">details of the commissioning or decommissioning of the operating plant</txt></block></li></list></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_8f3b0ef0-687d-45a6-8c14-84fe66494e30" id="sec.694A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A notice under this section must be given—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6f8f8455-3cb7-4eb9-aabc-54c24a6863d2" id="sec.694A-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in the approved form; and</txt></block></li><li guid="_d5410274-008b-41d3-9979-2345ccad7b66" id="sec.694A-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">in the way prescribed by regulation; and</txt></block></li><li guid="_65b3b7bf-e102-458e-bbdc-759024667443" id="sec.694A-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">no later than—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2d49e476-56e0-4a70-b0f3-3293bccaddea" id="sec.694A-ssec.4-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">for a notice under <intref check="valid" refid="sec.694A-ssec.1" target.guid="_1c98deb1-67dc-411c-b684-06e7cb325fba">subsection (1)</intref>—10 business days after the commencement and, after that period, any time the operator, executive safety manager or representative (if any) of the operator changes; and</txt></block></li><li guid="_97e936a9-d705-44ed-8f5f-1117ee1efb9c" id="sec.694A-ssec.4-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">for a notice under <intref check="valid" refid="sec.694A-ssec.2" target.guid="_e76b80a3-97f4-4072-831e-a8839c342e93">subsection (2)</intref>—a day prescribed by regulation.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d5b2766a-93f8-4d38-b684-348be896e700" id="sec.694A-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_61e155aa-b498-4643-a1f3-f1099d97a299" id="sec.694A-ssec.5-def.representative_"><txt break.before="1"><defterm guid="_033347e4-e982-4312-be13-1c744fd66b42" id="sec.694A-ssec.5-def.representative" type="definition">representative</defterm>, of an operator, means a individual nominated under <intref check="valid" refid="sec.688" target.guid="_866b286e-5641-4e33-b039-3f312ccb9208">section 688</intref><intref check="valid" refid="sec.688-ssec.1" target.guid="_bd055f41-b489-4d55-9316-d01c85f07d93">(1)</intref><intref check="valid" refid="sec.688-ssec.1-para1.a" target.guid="_c95ca1ab-4185-4fb0-9e8b-61ff3a3c0d09">(a)</intref>.</txt></definition></deflist></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_feccc805-854d-490d-9644-dd7ef21961d9" id="ch.9-pt.4"><no>Part 4</no><heading guid="_4f1ca2fd-d38f-4448-a912-b1e728087257" id="ch.9-pt.4-he">Other safety obligations</heading><division affected.by.uncommenced="0" guid="_87821a52-c454-4258-9379-01ef3f029c1b" id="ch.9-pt.4-div.1"><no>Division 1</no><heading guid="_78948f5e-a51e-4a8b-861f-973370a1c734" id="ch.9-pt.4-div.1-he">Obligations relating to plant or equipment for use in operating plant</heading><clause affected.by.uncommenced="0" guid="_6e109b9d-c148-4ecf-bdf8-1b3d9759d707" id="sec.695" provision.type="other" spent.amends="0"><no>695</no><heading guid="_57ce5d44-d318-4cf5-aa2d-6aeeaad9af2a" id="sec.695-he">Exclusion of application of division for coal mining-CSG operating plant</heading><block><txt break.before="1">This division does not apply for a coal mining-CSG operating plant.</txt><note guid="_d4c18cb6-5b63-4d2a-9855-6093aef2700f" id="sec.695-note" type="example"><heading guid="_ddc835be-20ed-4095-812a-1e38708c00a5" id="sec.695-note-he">Note—</heading><block><txt break.before="1">For coal mining-CSG operating plant, see the <legref check="valid" jurisd="QLD" target.doc.id="act-1999-039" target.version.series="aa8f4811-7589-4cef-8731-c79d6cf94546" type="act"><name emphasis="no">Coal Mining Safety and Health Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.43" target.doc.id="act-1999-039" target.guid="_73139dc8-8382-425b-8ec7-8439ce38004e" target.version.series="aa8f4811-7589-4cef-8731-c79d6cf94546" type="act">sections 43</legref> to <legref check="valid" jurisd="QLD" refid="sec.47" target.doc.id="act-1999-039" target.guid="_76bbe9c7-0e2d-4591-b164-f8b56df31531" target.version.series="aa8f4811-7589-4cef-8731-c79d6cf94546" type="act">47</legref>.</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_1c3744b9-a825-4174-8c20-16a5898c9e3b" id="sec.696" provision.type="other" spent.amends="0"><no>696</no><heading guid="_fc1149b2-eed9-43d1-8f51-2f9ee3e4b6e2" id="sec.696-he">Designers, importers, manufacturers and suppliers</heading><subclause affected.by.uncommenced="0" guid="_e876f597-cf12-4bf0-ae60-a9682a1e2fb0" id="sec.696-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5a880b8e-b195-4061-b972-f844dfcdce22" id="sec.696-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a person designs, imports, manufactures, modifies or supplies plant or equipment for use at a particular operating plant; and</txt></block></li><li guid="_5a1b7092-0e14-4db3-85a5-7137538c3bb7" id="sec.696-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a safety requirement applies to that type of plant or equipment.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9543b3d5-f23b-4bf2-bc7c-cd97d222bff9" id="sec.696-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The person must take reasonable steps to ensure the plant or equipment, as designed, imported, manufactured, modified or supplied, complies with the safety requirement.</txt></block><penalty guid="_7d4bb25c-3dec-415a-92a3-17db13d81ebf" id="sec.696-ssec.2-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty><note guid="_0c16e259-486b-434e-b6cd-a7c7d3fd633b" id="sec.696-ssec.2-note" type="example"><heading guid="_1ba860c0-939e-499b-bdd1-3696b47f4d25" id="sec.696-ssec.2-note-he">Note—</heading><block><txt break.before="1">This provision is an executive liability provision—see <intref check="valid" refid="sec.814" target.guid="_9fa8e8a1-4511-4ac6-b2de-5b287f47ce16">section 814</intref>.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_5762640d-39f4-4d3c-8a60-a9e0b1c3b652" id="sec.696-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the person becomes aware of a defect or hazard associated with the plant or equipment, the person must take reasonable steps to inform the operator, or proposed operator, of the operating plant of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_70ba32b4-02b5-4ed6-89a1-a201c3bdf90d" id="sec.696-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the nature of the defect or hazard and its significance; and</txt></block></li><li guid="_b8d73508-0d71-42b4-9c83-42e98b136d36" id="sec.696-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any controls or modifications the person is aware of that have been developed to eliminate or correct the defect or hazard or to manage the risk.</txt></block></li></list></block><penalty guid="_e6c716a7-d276-45c7-8bd8-768e9ab2b448" id="sec.696-ssec.3-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty><note guid="_21c72b15-cd26-4d8f-99ea-31c6267b9c67" id="sec.696-ssec.3-note" type="example"><heading guid="_0312995e-5b54-4d82-bee6-f2876f42fe97" id="sec.696-ssec.3-note-he">Note—</heading><block><txt break.before="1">This provision is an executive liability provision—see <intref check="valid" refid="sec.814" target.guid="_9fa8e8a1-4511-4ac6-b2de-5b287f47ce16">section 814</intref>.</txt></block></note></subclause></clause><clause affected.by.uncommenced="0" guid="_b7819e86-642b-4170-a5cb-4dd329e3e907" id="sec.697" provision.type="other" spent.amends="0"><no>697</no><heading guid="_f5b84211-55e0-469a-a38e-7176d03d0baa" id="sec.697-he">Installers</heading><subclause affected.by.uncommenced="0" guid="_24d78489-6e4e-4f72-8bf8-51952a25e20f" id="sec.697-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a safety requirement applies to a type of plant or equipment, a person must not install plant or equipment of that type at an operating plant, or proposed operating plant, unless the installation complies with the safety requirement.</txt></block><penalty guid="_65b4cd81-922b-4b7e-bb63-6ea6ce193a6b" id="sec.697-ssec.1-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty><note guid="_7d6a35b3-3cd8-4e62-b655-0424755471a8" id="sec.697-ssec.1-note" type="example"><heading guid="_012faf18-9c82-4a9f-a5cd-e7e6d3d898ca" id="sec.697-ssec.1-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_ca16e3d2-7d44-4207-8438-e05279bc37c2" id="sec.697-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the person is or becomes, aware of a safety risk in relation to the plant or equipment or the installation before the plant or equipment becomes operational, the person—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_92f1a81b-02a4-4ddc-96e9-5831bcd33bf3" id="sec.697-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must not operate the plant or equipment; and</txt></block></li><li guid="_eea6703c-5c39-42a0-9d88-73956598e483" id="sec.697-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">must give the operator of the operating plant, or proposed operating plant, notice of the safety risk.</txt></block></li></list></block><penalty guid="_608ac10f-ca7a-4db2-a560-747bda93b88f" id="sec.697-ssec.2-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty><note guid="_85f19a1e-8381-4ee4-ae3b-7f50753e22ce" id="sec.697-ssec.2-note" type="example"><heading guid="_eecd73ac-e843-4590-8b0c-a0e567831c46" id="sec.697-ssec.2-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_7420830b-ab8f-4983-afda-affd2463da28" id="sec.697-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The person must, before making the plant or equipment operational, certify that the installation complies with all relevant safety requirements.</txt></block><penalty guid="_f29071b4-e6ed-49f3-8536-5dd3139663a6" id="sec.697-ssec.3-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty><note guid="_f4ee5665-5383-428c-a5e5-b40e0e6b8d38" id="sec.697-ssec.3-note" type="example"><heading guid="_f8bf5212-4b25-4e4b-b298-cb7b27a8c52e" id="sec.697-ssec.3-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_50c39e71-12ef-420f-bd0d-76a32c4d6d62" id="sec.697-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_3b14495e-4cb2-4463-b209-4a8c7267738b" id="sec.697-ssec.4-def.operator_"><txt break.before="1"><defterm guid="_c3f1d72c-7e36-45c9-a3f2-b170e528e03e" id="sec.697-ssec.4-def.operator" type="definition">operator</defterm>, of a proposed operating plant, means the person who will be the operator of the plant when it becomes operational.</txt></definition></deflist></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_c721256b-aeff-46a7-be56-248a43b778be" id="ch.9-pt.4-div.3"><no>Division 3</no><heading guid="_852e9019-3e10-4d96-be42-f57cb95b2572" id="ch.9-pt.4-div.3-he">Control and management of risk at operating plant</heading><clause affected.by.uncommenced="0" guid="_da62968d-8e0b-4b13-a140-d092e9f1f16e" id="sec.699" provision.type="other" spent.amends="0"><no>699</no><heading guid="_25af6966-c9a7-4f01-9bc7-0be4a2f1af95" id="sec.699-he">General obligation to keep risk to acceptable level</heading><subclause affected.by.uncommenced="0" guid="_d1674ff1-217a-4240-9a5f-c4b388422c83" id="sec.699-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to a person on whom—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b37fb83a-d94b-4d60-853f-b3f9ba3f22ba" id="sec.699-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an obligation is imposed under this Act for an operating plant; or</txt></block></li><li guid="_70616dea-690e-449d-8b64-ea7945c936b3" id="sec.699-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an obligation is imposed under the safety management system for an operating plant.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_39cfc224-1f69-42f2-8e4f-28ed9235ecbb" id="sec.699-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">To the extent of the person’s obligation mentioned in <intref check="valid" refid="sec.699-ssec.1" target.guid="_d1674ff1-217a-4240-9a5f-c4b388422c83">subsection (1)</intref>, the person must take all reasonable steps to ensure no person or property is exposed to a level of risk in relation to the operating plant that is more than an acceptable level.</txt></block></subclause><penalty guid="_a3db6aad-c0ca-4073-8a9c-e192586812dd" id="sec.699-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></clause><clause affected.by.uncommenced="0" guid="_1603026a-0ca7-46e6-9541-4083af140d8c" id="sec.699A" provision.type="other" spent.amends="0"><no>699A</no><heading guid="_2965cd79-75e8-4f25-8ffe-9d403f0bedaf" id="sec.699A-he">Operator’s obligation for particular adjacent or overlapping authorities</heading><block><txt break.before="1">The operator of an operating plant must not carry out an activity at the plant if the activity creates an unacceptable level of risk to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bc4b3812-a13f-459d-afd5-90ae58044da2" id="sec.699A-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a person or operating plant at adjacent or overlapping coal mining operations under the <legref check="valid" jurisd="QLD" target.doc.id="act-1999-039" target.version.series="aa8f4811-7589-4cef-8731-c79d6cf94546" type="act"><name emphasis="no">Coal Mining Safety and Health Act</name></legref>; or</txt></block></li><li guid="_b15b186d-2057-4a24-96fe-2dca6592e3ec" id="sec.699A-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a person carrying out authorised activities or for an operating plant used to carry out authorised activities under an adjacent or overlapping petroleum tenure, geothermal tenure, <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> petroleum tenure or GHG tenure.</txt></block></li></list></block><penalty guid="_2f1a6042-6f2c-48d9-a268-588dc9e46f9d" id="sec.699A-pen"><block><txt break.before="1">Maximum penalty—1,500 penalty units.</txt></block></penalty></clause><clause affected.by.uncommenced="0" guid="_d7c93f4b-8f90-4bc9-b5b6-5cbd15a37916" id="sec.700" provision.type="other" spent.amends="0"><no>700</no><heading guid="_31c123a5-fa88-4d4c-9ada-071a10df5558" id="sec.700-he">What is an <defterm guid="_9c924f78-7e2c-4e8d-bf01-bd6ce1463479" type="mention">acceptable level</defterm> of risk</heading><subclause affected.by.uncommenced="0" guid="_1d69645b-5465-422d-afe1-79e50330ddee" id="sec.700-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">For a risk to a person or property to be at an <defterm guid="_7aabec86-2acb-4084-8a2c-175afd233a6d" id="sec.700-def.acceptablelevel-oc.2" type="definition">acceptable level</defterm>, the activities must be carried out so that the level of risk for the activities—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_995ce97e-bf85-4bcf-806f-eb0f7a621a31" id="sec.700-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is within acceptable safety limits, having regard to each relevant safety requirement; and</txt></block></li><li guid="_5631f14e-801a-4edc-bfac-41fa20d32117" id="sec.700-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is as low as is reasonably practicable.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a3d472ac-e968-4801-933d-614a2ad85497" id="sec.700-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">To decide whether the level of risk is within acceptable safety limits and as low as reasonably practicable, regard must be made to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e2190fed-afad-4fc7-a756-cfadca896661" id="sec.700-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the likelihood of injury or illness to a person, or of property damage, from the risk; and</txt></block></li><li guid="_9dac9dd5-471c-42d0-99f3-b35554722dde" id="sec.700-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the probable severity of the injury, illness or damage; and</txt></block></li><li guid="_613b2c54-c9e8-4e84-a7f0-bccb6f2632bf" id="sec.700-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">whether or not the risk is avoidable by reasonable means.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0c2ff71d-be88-445e-b39c-23cd6d552e13" id="sec.701" provision.type="other" spent.amends="0"><no>701</no><heading guid="_b5c29792-513d-400b-a2cb-e516d885a3b6" id="sec.701-he">When acceptable level of risk is achieved</heading><block><txt break.before="1">An acceptable level of risk to a person or property, from activities at an operating plant is achieved if management and operating systems are in effect that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6ee1b814-28d9-461d-b142-e2700f06c580" id="sec.701-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">identify, analyse and assess risk; and</txt></block></li><li guid="_f5a925eb-4cad-49d3-9cfe-df1c6b2a257e" id="sec.701-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">remove, minimise or modify unacceptable or avoidable risks; and</txt></block></li><li guid="_70b53910-7e1b-4a98-aa4c-650511270063" id="sec.701-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">monitor levels of risk; and</txt></block></li><li guid="_4c89ec93-27fc-40c9-83f8-9cb66bcc8e02" id="sec.701-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">investigate and analyse the cause of actual, or high potential, incidents at the plant to prevent or reduce their recurrence; and</txt></block></li><li guid="_a2a6181f-8501-4297-937a-f669480403a5" id="sec.701-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">review the effectiveness of implemented risk control measures, and take appropriate corrective and preventative action; and</txt></block></li><li guid="_90b828d8-e62d-47de-89ae-ffe825e59ea3" id="sec.701-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">comply with any relevant regulation.</txt></block></li></list></block></clause></division><division affected.by.uncommenced="0" guid="_11050bea-583d-4417-b9cf-9dfabda4040b" id="ch.9-pt.4-div.4"><no>Division 4</no><heading guid="_3faa532c-dc61-49dc-b174-829a92cbce5b" id="ch.9-pt.4-div.4-he">Other obligations of persons at operating plant</heading><clause affected.by.uncommenced="0" guid="_d93bd1bd-797a-4a8e-8834-12549e2a37b5" id="sec.702" provision.type="other" spent.amends="0"><no>702</no><heading guid="_babd569d-bc66-46e5-b160-ec22a00cb84f" id="sec.702-he">Requirement to comply with safety management system</heading><block><txt break.before="1">A person at an operating plant must take all reasonable steps to comply with safety procedures and other obligations under the safety management system for the plant to the extent the procedures and obligations apply to the person.</txt></block><penalty guid="_d455f184-5aba-4c67-8b8d-32a5c021c35e" id="sec.702-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></clause><clause affected.by.uncommenced="0" guid="_14704f70-c3b4-4604-8baf-1e2e550cbf21" id="sec.703" provision.type="other" spent.amends="0"><no>703</no><heading guid="_1fd5e43b-c3cd-4d73-b902-8d59ac096eac" id="sec.703-he">Requirement to comply with instructions</heading><block><txt break.before="1">A person at an operating plant must comply with lawful instructions given for the safety of persons by the operator of, or a supervisor for, the plant.</txt></block><penalty guid="_b4593dd2-4283-4b7b-85f7-78dddfed1be8" id="sec.703-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></clause><clause affected.by.uncommenced="0" guid="_611724b2-2902-492f-bad5-5c6bdf369114" id="sec.704" provision.type="other" spent.amends="0"><no>704</no><heading guid="_c8956697-5f01-489f-9bc7-a192c3505012" id="sec.704-he">Wilful or reckless acts or omissions that affect safety</heading><block><txt break.before="1">A person at an operating plant must not wilfully or recklessly do an act or make an omission that might adversely affect the safety of anyone at the plant.</txt></block><penalty guid="_e28cdec9-4fe4-40f0-87e4-c80c44f376f1" id="sec.704-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></clause></division><division affected.by.uncommenced="0" guid="_3ccd9143-f883-4790-8d0d-2f2006c5ce9b" id="ch.9-pt.4-div.5"><no>Division 5</no><heading guid="_7c409ecf-6fba-4c13-9c68-1cefbe78b020" id="ch.9-pt.4-div.5-he">Additional obligations of operator of operating plant on coal or oil shale mining lease or coal resource authority</heading><subdivision affected.by.uncommenced="0" guid="_871b13c6-0132-4ee8-8f83-05a6329f2dbf" id="ch.9-pt.4-div.5-sdiv.1"><no>Subdivision 1</no><heading guid="_8ff95b96-a83f-406f-a33f-32fce2824c02" id="ch.9-pt.4-div.5-sdiv.1-he">Joint interaction management plans</heading><clause affected.by.uncommenced="0" guid="_1f53eecc-3ab4-4dc9-b738-c77a7c7c8c3d" id="sec.705" provision.type="other" spent.amends="0"><no>705</no><heading guid="_32074c4b-aa1a-4d80-bd68-657b2ce7fd54" id="sec.705-he">Application of <intref check="valid" refid="ch.9-pt.4-div.5-sdiv.1" target.guid="_871b13c6-0132-4ee8-8f83-05a6329f2dbf">sdiv 1</intref></heading><block><txt break.before="1">This subdivision applies for an operating plant, other than a coal mining-CSG operating plant, if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2c599a8e-f0ff-4040-a326-e4dd2e76478f" id="sec.705-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the operating plant operates or is to operate in any of the following areas (each an <defterm guid="_b63e2a13-fba6-4a02-8d24-fb4d136d8f4c" id="sec.705-def.overlappingarea" type="definition">overlapping area</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_14e9e72f-eb43-4e75-a999-14df36555c85" id="sec.705-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the area of a coal or oil shale mining lease or tenement;</txt></block></li><li guid="_0e2fba31-16ab-49f3-9b71-fc1d3438a38b" id="sec.705-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">an area adjacent to the area of a coal or oil shale mining lease or tenement;</txt></block></li><li guid="_a22baf22-d48a-47c2-b87f-6cfe153c6a3d" id="sec.705-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the area of a coal resource authority to which the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.4" target.doc.id="act-2014-047" target.guid="_0d62e6fe-c34b-427b-962c-c3c899f79f8b" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">chapter 4</legref> applies; and</txt></block></li></list></block></li><li guid="_4f1dbf11-8ec1-4b27-a617-8f4849aaec2a" id="sec.705-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the operation of the plant physically affects, or may physically affect, the safety of persons or the mining of coal or oil shale under the coal or oil shale mining lease or tenement or coal resource authority.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_38abe539-5c16-4904-9b11-eaa2a6704baa" id="sec.705A" provision.type="other" spent.amends="0"><no>705A</no><heading guid="_b40077da-c990-4455-a887-be68befcdbc7" id="sec.705A-he">Definitions for <intref check="valid" refid="ch.9-pt.4-div.5-sdiv.1" target.guid="_871b13c6-0132-4ee8-8f83-05a6329f2dbf">sdiv 1</intref></heading><block><txt break.before="1">In this subdivision—</txt><deflist><definition affected.by.uncommenced="0" guid="_b08f0547-6957-4cb7-93da-e9b23b11de33" id="sec.705A-def.authorisedactivitiesoperatingplant_"><txt break.before="1"><defterm guid="_86cceed4-4c53-44ae-8633-2330f07cdb04" id="sec.705A-def.authorisedactivitiesoperatingplant" type="definition">authorised activities operating plant</defterm> means an operating plant under <intref check="valid" refid="sec.670" target.guid="_ca9c15a9-9ec2-415e-a6f6-8de0dd5edbf7">section 670</intref><intref check="valid" refid="sec.670-ssec.6" target.guid="_71029d28-afec-43f6-b66e-bf422d0140e6">(6)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_45b5f6df-c26d-48fb-ae7d-361cd43a5a20" id="sec.705A-def.coalresourceauthority_"><txt break.before="1"><defterm guid="_3d59f593-fd27-4f57-a735-4cdf210e2109" id="sec.705A-def.coalresourceauthority" type="definition">coal resource authority</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.103" target.doc.id="act-2014-047" target.guid="_fa8c60de-1084-4c77-b373-138f0c2dc3e2" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">section 103</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_611c8289-f6de-401a-b7a1-519112eb2d8e" id="sec.705A-def.jointinteractionmanagementplan_"><txt break.before="1"><defterm guid="_4e3e4f11-da74-4c73-a39d-40375e5e589f" id="sec.705A-def.jointinteractionmanagementplan" type="definition">joint interaction management plan</defterm> see <intref check="valid" refid="sec.705B" target.guid="_ab6efd8a-8fa8-409d-b85a-d32d09b9ac88">section 705B</intref><intref check="valid" refid="sec.705B-ssec.1" target.guid="_af4e8e15-5e41-4026-9135-e5a6e7ea93e5">(1)</intref><intref check="valid" refid="sec.705B-ssec.1-para1.a" target.guid="_1060d6d9-d461-4dc1-8200-d1dac7823bd3">(a)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_2e684123-91d1-4ebd-b1a9-66070d766d91" id="sec.705A-def.overlappingarea_"><txt break.before="1"><defterm guid="_03492a09-49dd-4f4c-983d-66ef6999f028" id="sec.705A-def.overlappingarea" type="definition">overlapping area</defterm> see <intref check="valid" refid="sec.705" target.guid="_1f53eecc-3ab4-4dc9-b738-c77a7c7c8c3d">section 705</intref><intref check="valid" refid="sec.705-para1.a" target.guid="_2c599a8e-f0ff-4040-a326-e4dd2e76478f">(a)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_7e4f6e12-91dd-4077-9c51-e46e473e7a21" id="sec.705A-def.siteseniorexecutive_"><txt break.before="1"><defterm guid="_209574a4-ac6a-494a-8610-f04eaa6c5f38" id="sec.705A-def.siteseniorexecutive" type="definition">site senior executive</defterm> means the site senior executive for a coal mine in the overlapping area.</txt></definition></deflist></block></clause><clause affected.by.uncommenced="0" guid="_ab6efd8a-8fa8-409d-b85a-d32d09b9ac88" id="sec.705B" provision.type="other" spent.amends="0"><no>705B</no><heading guid="_139f448f-fb9e-4e21-8545-692d0601389f" id="sec.705B-he">Requirement for joint interaction management plan</heading><subclause affected.by.uncommenced="0" guid="_af4e8e15-5e41-4026-9135-e5a6e7ea93e5" id="sec.705B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of an authorised activities operating plant in the overlapping area must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1060d6d9-d461-4dc1-8200-d1dac7823bd3" id="sec.705B-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before carrying out activities in the overlapping area, make a plan for the plant that applies to all operators of operating plants in the overlapping area and that complies with <intref check="valid" refid="sec.705C" target.guid="_0d8ca067-2468-476e-810e-9f48381c0f9b">section 705C</intref> (a <defterm guid="_e3a2fc75-5a17-4edb-ad37-083ba26c91a9" id="sec.705B-ssec.1-def.jointinteractionmanagementplan" type="definition">joint interaction management plan</defterm>); and</txt></block></li><li guid="_2979e63a-a0a2-4d27-9e9f-97d6f3033f1e" id="sec.705B-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">before making the plan—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5a68dd90-e7cf-452f-8f52-ebcff57d9b8e" id="sec.705B-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">make reasonable attempts to consult with the operators of each operating plant in the overlapping area and the site senior executive to jointly identify, analyse and assess risks and hazards in the overlapping area; and</txt></block></li><li guid="_cf80430a-564c-47dc-acee-80e58bd99c47" id="sec.705B-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">have regard to any reasonable provisions for the plan, relating to the management of the risks and hazards that are proposed by the site senior executive within 20 days after receiving a copy of the proposed plan; and</txt></block></li><li guid="_f79decc1-7d9f-4287-aed2-8496042f513b" id="sec.705B-ssec.1-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">either—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ce3d9652-3128-4133-b6b2-f2ad44ac0568" id="sec.705B-ssec.1-para1.b-para2.iii-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">reach agreement with the site senior executive about the content of the proposed plan; or</txt></block></li><li guid="_6840eb8f-de61-4304-b170-8c5f2cd5363e" id="sec.705B-ssec.1-para1.b-para2.iii-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">apply for arbitration of the dispute under <intref check="valid" refid="sec.705B-ssec.3" target.guid="_982056dc-92ff-4cb5-9649-09a16ac0162d">subsection (3)</intref> or <intref check="valid" refid="sec.705B-ssec.4" target.guid="_625d08b6-346f-401d-8d76-ee29588949a9">(4)</intref>; and</txt></block></li></list></block></li></list></block></li><li guid="_6fa4a347-893b-4295-9d61-de309b9e6988" id="sec.705B-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">comply with the plan. </txt></block></li></list></block><penalty guid="_5b5e123e-3c92-4a4a-8685-f1ef76a43787" id="sec.705B-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_08b10fd2-a8dd-4736-b30f-9d8d7c607ed3" id="sec.705B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.705B-ssec.1" target.guid="_af4e8e15-5e41-4026-9135-e5a6e7ea93e5">subsection (1)</intref><intref check="valid" refid="sec.705B-ssec.1-para1.b" target.guid="_2979e63a-a0a2-4d27-9e9f-97d6f3033f1e">(b)</intref><intref check="valid" refid="sec.705B-ssec.1-para1.b-para2.i" target.guid="_5a68dd90-e7cf-452f-8f52-ebcff57d9b8e">(i)</intref>, the operator is taken to have made reasonable attempts to consult with the site senior executive if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_12e14dd3-c669-4f3a-a597-ccf0b65113a3" id="sec.705B-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the operator gives the site senior executive a copy of the proposed plan; and</txt></block></li><li guid="_6fe1b238-97f9-4e5b-8e30-4b5bb42743e3" id="sec.705B-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the site senior executive has not, within 20 days after being given the copy, made any proposal to the operator about the provisions for the plan.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_982056dc-92ff-4cb5-9649-09a16ac0162d" id="sec.705B-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the operator and the site senior executive can not agree on the content of a proposed plan within 3 months after the site senior executive receives a copy of the proposed plan, the operator must apply for arbitration of the dispute.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_625d08b6-346f-401d-8d76-ee29588949a9" id="sec.705B-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Despite <intref check="valid" refid="sec.705B-ssec.3" target.guid="_982056dc-92ff-4cb5-9649-09a16ac0162d">subsection (3)</intref>, either party may apply for arbitration of the dispute at any time.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0d8ca067-2468-476e-810e-9f48381c0f9b" id="sec.705C" provision.type="other" spent.amends="0"><no>705C</no><heading guid="_66ade3a5-bbd8-4300-9bd5-684a93910965" id="sec.705C-he">Content of joint interaction management plan</heading><subclause affected.by.uncommenced="0" guid="_859ba257-adad-4fc1-a9f5-b9d50ead4aa6" id="sec.705C-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A joint interaction management plan must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7f3355ec-f37e-4606-baaf-067e855c7eee" id="sec.705C-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be stored or kept together with the other parts of the safety management system for the plant; and</txt></block></li><li guid="_9832aead-25d4-45ae-a471-ba7238048ea0" id="sec.705C-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for an overlapping area mentioned in <intref check="valid" refid="sec.705" target.guid="_1f53eecc-3ab4-4dc9-b738-c77a7c7c8c3d">section 705</intref><intref check="valid" refid="sec.705-para1.a" target.guid="_2c599a8e-f0ff-4040-a326-e4dd2e76478f">(a)</intref><intref check="valid" refid="sec.705-para1.a-para2.iii" target.guid="_a22baf22-d48a-47c2-b87f-6cfe153c6a3d">(iii)</intref>—identify, if any, each IMA, RMA and SOZ, as defined under the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, in the overlapping area; and</txt></block></li><li guid="_690562b2-46df-48e5-a93f-6103793692e5" id="sec.705C-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">identify the hazards and assess the risks to be controlled that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d7abf37b-c6d4-49c3-bc9b-855b109b2f6c" id="sec.705C-ssec.1-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">are, or may be, created by the mining operations or petroleum activities carried out in the overlapping area; and</txt></block></li><li guid="_db058354-4a4a-4b8b-97c0-08ef78f82469" id="sec.705C-ssec.1-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">affect, or may be likely to affect, the safety and health of persons in the overlapping area; and</txt></block></li></list></block></li><li guid="_ad67337b-0d8f-4403-96f9-4d8405349e51" id="sec.705C-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">for each risk—identify the triggers or material changes, or likely triggers or material changes, that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3463cf59-ecdf-42d7-baa3-ca1cc594c06e" id="sec.705C-ssec.1-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">must be monitored to ensure the safety and health of persons in the overlapping area; and</txt></block></li><li guid="_4e4da3a6-b9a0-40d9-a330-e03ab12373db" id="sec.705C-ssec.1-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">will require the plan to be reviewed; and</txt></block></li></list></block></li><li guid="_7a961460-20a9-429f-aa26-59560c971513" id="sec.705C-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">for each trigger or material change identified under <intref check="valid" refid="sec.705C-ssec.1-para1.d" target.guid="_ad67337b-0d8f-4403-96f9-4d8405349e51">paragraph (d)</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4dd41881-c671-4f9e-82c4-c940aa25b2ff" id="sec.705C-ssec.1-para1.e-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">state the response procedures and times; and</txt></block></li><li guid="_6e222723-1f29-4c51-b099-0692c300a51f" id="sec.705C-ssec.1-para1.e-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">state the type of action required for the response; and</txt><note guid="_97250b61-0806-4cce-8f67-dd3e7a65f882" id="sec.705C-ssec.1-para1.e-para2.ii-note" type="example"><heading guid="_0530bb71-6b70-4381-b32e-c99b778bfb1e" id="sec.705C-ssec.1-para1.e-para2.ii-note-he">Examples of action that may be required—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_1a5024e1-6c91-4578-ac3c-56aaa336fc27" id="sec.705C-ssec.1-para1.e-para2.ii-note-para3.1" provision.type="other"><no>1</no><block><txt break.before="0">a risk analysis</txt></block></li><li guid="_c886ee85-476e-4dc6-a9f2-ef29f83fe06e" id="sec.705C-ssec.1-para1.e-para2.ii-note-para3.2" provision.type="other"><no>2</no><block><txt break.before="0">notice to the site senior executive of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6bf77a08-4450-4079-b656-5e7d4fedc9b2" id="sec.705C-ssec.1-para1.e-para2.ii-note-para3.2-para4.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a drop in hydrostatic pressure that may show a potential hazard to persons carrying out mining; or</txt></block></li><li guid="_d7912102-40da-47a7-a1ad-d874946738b4" id="sec.705C-ssec.1-para1.e-para2.ii-note-para3.2-para4.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a change in water level that may indicate differences in fluid interconnections with an adjacent mine</txt></block></li></list></block></li></list></block></note></block></li><li guid="_7a802ada-5be7-44e4-8948-00a4ea9053a2" id="sec.705C-ssec.1-para1.e-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">state the reporting procedures; and</txt></block></li></list></block></li><li guid="_a33ef579-d97b-4ecd-9d51-7b19df004a0b" id="sec.705C-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">if there is proposed, or there is likely to be, interaction with other persons in the overlapping area—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ad4a9f1c-de0a-466a-9ee0-b6a2e2062bd9" id="sec.705C-ssec.1-para1.f-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">describe the proposed or likely interactions, and how they will be managed; and</txt></block></li><li guid="_349d755d-f091-4435-a766-fb437030bf63" id="sec.705C-ssec.1-para1.f-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">identify the specific risks that may arise as a result of the proposed or likely interactions, and how the risks will be controlled; and</txt></block></li><li guid="_f3fef2c1-9a05-463b-a548-706802c4c276" id="sec.705C-ssec.1-para1.f-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">identify the safety responsibilities of each person; and</txt></block></li><li guid="_f1a60255-3f20-41aa-93f8-78349eb95da9" id="sec.705C-ssec.1-para1.f-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">state the name of the site senior executive and any other senior persons in the management structure for the coal mine under the <legref check="valid" jurisd="QLD" target.doc.id="act-1999-039" target.version.series="aa8f4811-7589-4cef-8731-c79d6cf94546" type="act"><name emphasis="yes">Coal Mining Safety and Health Act 1999</name></legref>; and</txt></block></li></list></block></li><li guid="_c441e8c9-4843-4c78-8cf5-0c599b0ef725" id="sec.705C-ssec.1-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">describe the way in which the plan will be reviewed and revised, including ongoing consultation with the persons mentioned in <intref check="valid" refid="sec.705C-ssec.1-para1.f" target.guid="_a33ef579-d97b-4ecd-9d51-7b19df004a0b">paragraph (f)</intref>; and</txt></block></li><li guid="_4e6aac86-aa55-4cb5-a379-724e94e247d0" id="sec.705C-ssec.1-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">describe the way in which details of any new operator or site safety manager will be communicated to the site senior executive; and</txt></block></li><li guid="_7a624482-b0ad-4969-84f8-944e798dd857" id="sec.705C-ssec.1-para1.i" provision.type="other"><no>(i)</no><block><txt break.before="0">include any other information prescribed by regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b8221e1c-9bae-42f4-a65c-3aaf4021b4f1" id="sec.705C-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A regulation may prescribe a guide of potential hazards that may be created by an operating plant in relation to mining coal (the <defterm guid="_7657ab57-b86d-47e5-95b3-1595a69270b0" id="sec.705C-def.potentialhazardguide" type="definition">potential hazard guide</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_42410f8c-b9a0-47cf-9baf-31852b6f89cb" id="sec.705C-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The potential hazard guide must be referred to for help in identifying the hazards and assessing the risks mentioned in <intref check="valid" refid="sec.705C-ssec.1" target.guid="_859ba257-adad-4fc1-a9f5-b9d50ead4aa6">subsection (1)</intref><intref check="valid" refid="sec.705C-ssec.1-para1.c" target.guid="_690562b2-46df-48e5-a93f-6103793692e5">(c)</intref> but is not intended to be exhaustive.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a1d06d83-1130-40af-aea0-1a7ee71508d3" id="sec.705C-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">To remove any doubt, it is declared that a joint interaction management plan may apply to more than 1 overlapping area.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_df92b596-73aa-44ac-806b-7fa8167dc6b1" id="sec.705CA" provision.type="other" spent.amends="0"><no>705CA</no><heading guid="_0511d59b-3ed7-46ce-ad0f-b8fd8e51ef03" id="sec.705CA-he">Notification of making of joint interaction management plan</heading><block><txt break.before="1">As soon as practicable after making a joint interaction management plan, and before carrying out activities in the overlapping area or at an operating plant in the overlapping area, the operator of the authorised activities operating plant must notify the chief inspector that the plan has been made.</txt><penalty guid="_8f9ad1be-01ec-4cc9-90e6-e99b5cfd75f3" id="sec.705CA-pen"><block><txt break.before="1">Maximum penalty—40 penalty units.</txt></block></penalty></block></clause><clause affected.by.uncommenced="0" guid="_0fa9bf6e-64cb-4a6b-9183-d7975f20d5ee" id="sec.705CB" provision.type="other" spent.amends="0"><no>705CB</no><heading guid="_68f3a858-b78a-467d-9546-142acdb87891" id="sec.705CB-he">Review</heading><subclause affected.by.uncommenced="0" guid="_76e8ec33-1107-41a5-9493-1231dbc610db" id="sec.705CB-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f4977d92-a789-4b24-b857-e21da368227e" id="sec.705CB-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">it is proposed to change a joint interaction management plan; or</txt></block></li><li guid="_dc203a56-982b-4c5e-b594-dc840b676f5c" id="sec.705CB-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a change in the overlapping area, or at an operating plant in the overlapping area, is likely to give rise to an additional risk to safety or health in the overlapping area or at the plant; or</txt></block></li><li guid="_0f077514-6b15-4bc4-8f63-8435e1d36164" id="sec.705CB-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">any of the following circumstances exist—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7cc8ad98-7fc8-4b5c-b840-174ae90fc2b6" id="sec.705CB-ssec.1-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">an additional risk to safety or health in the overlapping area, or at an operating plant in the overlapping area, is identified;</txt></block></li><li guid="_61707eb5-bd0a-4301-a756-cce65cadc4d9" id="sec.705CB-ssec.1-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">consultation with workers indicates a review is necessary;</txt></block></li><li guid="_763aa3ce-f58b-4d1b-9b0d-25704c972433" id="sec.705CB-ssec.1-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">a risk control measure did not control the risk it was intended to control to an acceptable level.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d75f89ac-21b5-4143-8416-cd122ef38c8e" id="sec.705CB-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.705CB-ssec.1" target.guid="_76e8ec33-1107-41a5-9493-1231dbc610db">subsection (1)</intref><intref check="valid" refid="sec.705CB-ssec.1-para1.b" target.guid="_dc203a56-982b-4c5e-b594-dc840b676f5c">(b)</intref>, a change in the overlapping area, or at an operating plant in the overlapping area, includes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ee970add-f181-4175-a0a3-be85e0beedd5" id="sec.705CB-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a change to any aspect of the overlapping area or the plant itself; and</txt></block></li><li guid="_7d98d311-d08c-4393-8673-4434eccd4831" id="sec.705CB-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a change to a system of work, process or procedure in the overlapping area or at the plant.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d9ee2bba-2cdd-4618-a21f-957e44b67dd4" id="sec.705CB-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The operator of the authorised activities operating plant must review and, if necessary, revise the joint interaction management plan.</txt></block><penalty guid="_e77638a6-b7bd-41cd-9dc1-85c2bef11fc1" id="sec.705CB-ssec.3-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_c719fe45-b516-408b-9864-1e71160f7d33" id="sec.705CB-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The review must take place in consultation with the operators of each operating plant in the overlapping area, the site senior executive and any other workers to the extent they are affected by the matters under review.</txt></block><penalty guid="_de88bda7-f626-4b3a-bce3-6fdda7585c56" id="sec.705CB-ssec.4-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_34fd04c6-f2d8-4c0b-9c29-df682bf1d12a" id="sec.705CB-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The review must take place—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b5767cbe-9712-409b-9796-fcd9cc05585d" id="sec.705CB-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for <intref check="valid" refid="sec.705CB-ssec.1" target.guid="_76e8ec33-1107-41a5-9493-1231dbc610db">subsection (1)</intref><intref check="valid" refid="sec.705CB-ssec.1-para1.a" target.guid="_f4977d92-a789-4b24-b857-e21da368227e">(a)</intref> or <intref check="valid" refid="sec.705CB-ssec.1-para1.b" target.guid="_dc203a56-982b-4c5e-b594-dc840b676f5c">(b)</intref>—before the change to the joint interaction management plan is made; or</txt></block></li><li guid="_8ec32858-a3b4-4f7c-9f42-4b997fba8498" id="sec.705CB-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for <intref check="valid" refid="sec.705CB-ssec.1" target.guid="_76e8ec33-1107-41a5-9493-1231dbc610db">subsection (1)</intref><intref check="valid" refid="sec.705CB-ssec.1-para1.c" target.guid="_0f077514-6b15-4bc4-8f63-8435e1d36164">(c)</intref>—as soon as possible after the circumstance exists.</txt></block></li></list></block><penalty guid="_098f81c7-db82-490a-abc9-1062e4eaf7e0" id="sec.705CB-ssec.5-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_bda12576-6787-4a49-8742-87952edcf4b0" id="sec.705CB-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">A revision of the plan under <intref check="valid" refid="sec.705CB-ssec.3" target.guid="_d9ee2bba-2cdd-4618-a21f-957e44b67dd4">subsection (3)</intref> must be recorded on the plan.</txt></block><penalty guid="_4c18882e-3bc2-4eda-96c6-c71ce4085f49" id="sec.705CB-ssec.6-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_35074b5e-2f33-4011-a767-6252702f6fa7" id="sec.705CB-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">If the operator of the authorised activities operating plant and the site senior executive can not agree on the content of a revision of the plan, either party may apply for arbitration of the dispute.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_2729492b-1f4f-47fa-9533-bb934cde3458" id="ch.9-pt.4-div.5-sdiv.2"><no>Subdivision 2</no><heading guid="_468426bd-5048-4d3b-a864-e2e2dad39c1a" id="ch.9-pt.4-div.5-sdiv.2-he">Additional reporting requirement</heading><clause affected.by.uncommenced="0" guid="_50017984-ea66-44d3-86c1-7e4e9d2eaa1f" id="sec.705D" provision.type="other" spent.amends="0"><no>705D</no><heading guid="_8a961bd5-f4dd-43ba-96d3-b011cfa4fa4c" id="sec.705D-he">Reporting of particular accidents and prescribed high potential incidents</heading><subclause affected.by.uncommenced="0" guid="_a8c5b28e-bbf5-48b4-a068-551b0647cffb" id="sec.705D-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the operator of operating plant, other than a coal mining-CSG operating plant, operated in the area of a coal or oil shale mining lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_eb8169fd-b6ca-417f-8bdc-d9c35daeb8e5" id="sec.705D-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The operator must, on becoming aware that a designated accident or incident has happened immediately report the accident or incident, either orally or by notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_aec9f922-863b-4849-b7e2-370ec830046e" id="sec.705D-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the operator makes an oral report under <intref check="valid" refid="sec.705D-ssec.2" target.guid="_eb8169fd-b6ca-417f-8bdc-d9c35daeb8e5">subsection (2)</intref>, the operator must confirm the report by notice within 48 hours.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_39ba2f3a-8c34-47ba-b3f9-e9653ba2e951" id="sec.705D-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The report and confirmation must be made to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f5f2dec3-ea80-47d9-ad50-320c6d16446b" id="sec.705D-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to the senior site executive under the <legref check="valid" jurisd="QLD" target.doc.id="act-1999-039" target.version.series="aa8f4811-7589-4cef-8731-c79d6cf94546" type="act"><name emphasis="no">Coal Mining Safety and Health Act</name></legref> for the coal mine the subject of the mining lease; and</txt></block></li><li guid="_4a25ebac-192a-4850-bd78-799952761f51" id="sec.705D-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the chief inspector.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c7847fa1-1dea-435d-ac7a-6e9452cde1e9" id="sec.705D-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_d2023d1d-2606-46c5-8cad-a67fa3c41a96" id="sec.705D-ssec.5-def.designatedaccidentorincident_"><txt break.before="1"><defterm guid="_529a4bb3-c53c-4a27-b3cd-8d2c93e9d556" id="sec.705D-ssec.5-def.designatedaccidentorincident" type="definition">designated accident or incident</defterm> means an accident or incident as follows that relates to the safety of any coal mining operation—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3b6b6869-ea7e-46a8-ab75-b2fefaa5fc07" id="sec.705D-ssec.5-def.designatedaccidentorincident-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an accident that causes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f938ce5e-b010-42f4-a96d-8b1ab219fd9e" id="sec.705D-ssec.5-def.designatedaccidentorincident-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the death of a person; or</txt></block></li><li guid="_c92b4c0d-409b-427b-af8f-e93888872ace" id="sec.705D-ssec.5-def.designatedaccidentorincident-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a person to be admitted to a hospital as an in-patient for treatment for a bodily injury endangering, or likely to endanger, the person’s life; or</txt></block></li><li guid="_65aee094-07f4-48f9-be2f-c2c6c1f5e288" id="sec.705D-ssec.5-def.designatedaccidentorincident-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">a person to suffer an injury causing, or likely to cause, a permanent injury to the person’s health;</txt></block></li></list></block></li><li guid="_e5f468a9-2c9c-46d3-a69b-208b63311ab0" id="sec.705D-ssec.5-def.designatedaccidentorincident-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a high potential incident of a type prescribed under the <legref check="valid" jurisd="QLD" target.doc.id="act-1999-039" target.version.series="aa8f4811-7589-4cef-8731-c79d6cf94546" type="act"><name emphasis="no">Coal Mining Safety and Health Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.198" target.doc.id="act-1999-039" target.guid="_83a21b70-069b-49f8-9ea0-4467eefaa932" target.version.series="aa8f4811-7589-4cef-8731-c79d6cf94546" type="act">section 198</legref><legref check="invalid" jurisd="QLD" type="act">(2)</legref><legref check="invalid" jurisd="QLD" type="act">(b)</legref>.</txt></block></li></list></definition></deflist></block></subclause></clause></subdivision></division><division affected.by.uncommenced="0" guid="_678b712f-490b-4363-9bd0-194b7c4ae6b3" id="ch.9-pt.4-div.6"><no>Division 6</no><heading guid="_fae69bdb-325f-4198-b3a6-8faaf7ffb983" id="ch.9-pt.4-div.6-he">Prescribed incident reporting and security of incident sites</heading><clause affected.by.uncommenced="0" guid="_a8d332d7-5795-463d-9635-62b4bac5786d" id="sec.706" provision.type="other" spent.amends="0"><no>706</no><heading guid="_537f9269-21e6-4b55-b196-a262f4b2a51a" id="sec.706-he">Requirement to report prescribed incident</heading><subclause affected.by.uncommenced="0" guid="_1190838a-5fcd-46c2-bc0b-b8126cfd8350" id="sec.706-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A regulation may prescribe for incidents happening at an operating plant or for incidents relating to a gas related device—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_47624d9b-dc72-46fd-ba3f-aac3aadca708" id="sec.706-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the types of incidents (<defterm guid="_8ec34470-af05-486b-bdb5-176d5eb9a5ce" id="sec.706-ssec.1-def.prescribedincidents" type="definition">prescribed incidents</defterm>) that must be reported to the chief inspector; and</txt></block></li><li guid="_7f4e3d2a-baea-46a4-9346-455d7d31d2fe" id="sec.706-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the way in which prescribed incidents must be reported.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9fe7974f-f2b2-4b9e-bbfd-3930fe72a5fd" id="sec.706-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If a prescribed incident happens at an operating plant, the operator of the plant must ensure that the incident is reported to the chief inspector in the prescribed way.</txt></block><penalty guid="_c63fd87e-881d-4c55-8568-5956025c1be5" id="sec.706-ssec.2-pen"><block><txt break.before="1">Maximum penalty—50 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_35b74d20-c386-4fae-8dac-b3a5c05f84f8" id="sec.706-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If a prescribed incident happens at a business other than at an operating plant and the prescribed incident relates to a gas related device, the person carrying on the business must ensure that the incident is reported to the chief inspector in the prescribed way.</txt></block><penalty guid="_6fe20ca5-59d6-4b2f-a532-6e50ea67e179" id="sec.706-ssec.3-pen"><block><txt break.before="1">Maximum penalty—50 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_0648e56c-af39-4e6a-a230-5113b27f3afb" id="sec.706-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">For <intref check="valid" refid="sec.706-ssec.2" target.guid="_9fe7974f-f2b2-4b9e-bbfd-3930fe72a5fd">subsections (2)</intref> and <intref check="valid" refid="sec.706-ssec.3" target.guid="_35b74d20-c386-4fae-8dac-b3a5c05f84f8">(3)</intref>, the incident must be reported—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ca8d6762-72eb-4cbb-81f4-3036d05d1d78" id="sec.706-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">within the period prescribed under a regulation; or</txt></block></li><li guid="_85f50f2f-74b7-43d7-8f32-3aa1325afbd1" id="sec.706-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if no period is prescribed—immediately.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_043de5ab-0381-40d6-b999-7353bb6a722b" id="sec.706-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">A person is taken to have complied with <intref check="valid" refid="sec.706-ssec.2" target.guid="_9fe7974f-f2b2-4b9e-bbfd-3930fe72a5fd">subsection (2)</intref> or <intref check="valid" refid="sec.706-ssec.3" target.guid="_35b74d20-c386-4fae-8dac-b3a5c05f84f8">(3)</intref> if the <legref check="valid" jurisd="QLD" target.doc.id="act-1999-039" target.version.series="aa8f4811-7589-4cef-8731-c79d6cf94546" type="act"><name emphasis="no">Coal Mining Safety and Health Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.198" target.doc.id="act-1999-039" target.guid="_83a21b70-069b-49f8-9ea0-4467eefaa932" target.version.series="aa8f4811-7589-4cef-8731-c79d6cf94546" type="act">section 198</legref><legref check="invalid" jurisd="QLD" type="act">(1)</legref>, applies to the person and the person has complied with that subsection.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1b188c48-7763-46c7-ae9c-8c7d0f8ef4c9" id="sec.707" provision.type="other" spent.amends="0"><no>707</no><heading guid="_628c39d6-6816-4740-bc1e-7599daf1b4e4" id="sec.707-he">Obligation to restrict access to incident site</heading><subclause affected.by.uncommenced="0" guid="_2d87f653-eaec-4b46-aee2-7d3ee6436e43" id="sec.707-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f19b011f-2b6f-4b01-a9a9-d489f3757855" id="sec.707-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a prescribed incident happens at an operating plant; or</txt></block></li><li guid="_f0b5bccc-3a9b-48ea-9f03-19334be46e24" id="sec.707-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a prescribed incident relating to a gas related device happens at a business other than an operating plant.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_416b5474-4969-41dc-98be-9b22db573c07" id="sec.707-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the operator of the operating plant or person carrying on the business is required to immediately report the incident to the chief inspector under <intref check="valid" refid="sec.706" target.guid="_a8d332d7-5795-463d-9635-62b4bac5786d">section 706</intref>, the operator or person must, until an inspector otherwise directs, take action reasonably necessary to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_52995f61-3866-42ff-9079-45f675260422" id="sec.707-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">restrict access to the site at which the prescribed incident happened or is happening; and</txt></block></li><li guid="_410195c9-3a25-4108-b50b-9c42ecd9366c" id="sec.707-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">protect anything at the site from being tampered with.</txt></block></li></list><note guid="_64eb5435-0248-4060-a1f0-7593039d568d" id="sec.707-ssec.2-note" type="example"><heading guid="_5d20e8bc-28de-4b04-9b22-52060f4ae579" id="sec.707-ssec.2-note-he">Example of action—</heading><block><txt break.before="1">erecting barriers or signs prohibiting unauthorised persons from entering the site</txt></block></note></block><penalty guid="_e43c8768-d68c-4198-93ff-52cb2d629234" id="sec.707-ssec.2-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_fbbb07a2-cc04-4708-b33f-93376b777924" id="sec.707-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">An inspector may take action, or direct the operator of the operating plant or person carrying on the business to take a particular action, the inspector considers reasonably necessary to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_27f14b85-2191-4d8a-a9ae-98b2f4dc0d35" id="sec.707-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">restrict access to the site at which the prescribed incident happened or is happening; and</txt></block></li><li guid="_1cbf9af1-0736-4b02-ad6f-3add853f6ddc" id="sec.707-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">protect anything at the site from being tampered with.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1311f071-b966-498e-8c25-0ec3b7a8b44d" id="sec.707-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The operator of the operating plant or person carrying on the business must comply with a direction given to the operator or person under <intref check="valid" refid="sec.707-ssec.3" target.guid="_fbbb07a2-cc04-4708-b33f-93376b777924">subsection (3)</intref>.</txt></block><penalty guid="_961660a3-d9d5-43ed-a75c-928131ec4a25" id="sec.707-ssec.4-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause></clause><clause affected.by.uncommenced="0" guid="_579ed606-b9ed-4d83-b164-7b6b1967a191" id="sec.708" provision.type="other" spent.amends="0"><no>708</no><heading guid="_6cc3685a-261c-47f7-a10a-be595cf289f0" id="sec.708-he">Offence to enter or remain in incident site if access restricted</heading><subclause affected.by.uncommenced="0" guid="_1e17adda-cd41-464c-bb4c-98ba3d9bb68c" id="sec.708-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, under <intref check="valid" refid="sec.707" target.guid="_1b188c48-7763-46c7-ae9c-8c7d0f8ef4c9">section 707</intref>, action has been taken to restrict access to the site of a prescribed incident.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2f059dad-36d1-4932-b0c1-81b8d2ffad74" id="sec.708-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A person must not enter, or remain in, the site unless the person—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_294b5627-c133-43e9-89d2-7191352cf7f1" id="sec.708-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is an inspector, or is authorised by an inspector; or</txt></block></li><li guid="_dd6f6788-01ba-49cc-82fe-43892339b298" id="sec.708-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">enters, or remains in, the site to save life or prevent further injury.</txt></block></li></list></block><penalty guid="_b6c2fb45-bcec-4bcc-a733-0a5c5143189c" id="sec.708-ssec.2-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_6e4b5e05-8041-4214-87d9-ba01b04d6679" id="sec.708-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A person on the site, other than an inspector, must take all reasonable steps to minimise disturbance of the site.</txt></block><penalty guid="_9efcddd3-5e44-4d92-b8a4-995bd8d98aed" id="sec.708-ssec.3-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause></clause></division><division affected.by.uncommenced="0" guid="_53054bc2-3833-461d-964b-cbb6bc9dce48" id="ch.9-pt.4-div.7"><no>Division 7</no><heading guid="_e3fc3f5a-e46f-4ead-b5c3-c3021cc8a631" id="ch.9-pt.4-div.7-he">Obligation to comply with safety requirements and instructions</heading><clause affected.by.uncommenced="0" guid="_66cb4510-4f0b-4e37-ae80-645da0b5cfe8" id="sec.708A" provision.type="other" spent.amends="0"><no>708A</no><heading guid="_6dde3441-cbb9-4f21-b354-4c5182231ef5" id="sec.708A-he">Offence not to comply with safety requirement</heading><subclause affected.by.uncommenced="0" guid="_4311d67f-d03d-48a6-8899-cab192b92929" id="sec.708A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must comply with all safety requirements.</txt></block><penalty guid="_6e997f16-2e69-4d18-8235-a4d6da33be5d" id="sec.708A-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty><note guid="_654d6181-60ae-43f2-8320-e32e3078dc50" id="sec.708A-ssec.1-note" type="example"><heading guid="_786cce97-00ae-4250-9fa1-a05545bece4e" id="sec.708A-ssec.1-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_c5775fa6-f76d-4d2a-949d-195584dddc22" id="sec.708A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.708A-ssec.1" target.guid="_4311d67f-d03d-48a6-8899-cab192b92929">Subsection (1)</intref> does not apply in relation to <intref check="valid" refid="sec.696" target.guid="_1c3744b9-a825-4174-8c20-16a5898c9e3b">sections 696</intref>, <intref check="valid" refid="sec.697" target.guid="_b7819e86-642b-4170-a5cb-4dd329e3e907">697</intref>, <del xml:space="preserve"><intref check="valid" refid="sec.733" target.guid="_f1623434-293e-4b90-bef4-22f13c5b2bf4">733</intref></del><ins xml:space="preserve">731AA</ins> and <intref check="valid" refid="sec.734" target.guid="_03eaca55-5625-4b02-8f0c-4acea364ae57">734</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d9784b50-6855-4761-be57-e4b3e0b61ff6" id="sec.708B" provision.type="other" spent.amends="0"><no>708B</no><heading guid="_f2d31652-a95a-4800-bb81-8255400dfb4b" id="sec.708B-he">Chief inspector may issue safety alerts and instructions</heading><subclause affected.by.uncommenced="0" guid="_8f91a569-5f71-4ed6-8889-b5ad88d3533f" id="sec.708B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A safety alert is advisory only and may recommend that a person or the general public do or not do something.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_17af977c-c3e8-4a13-a35e-3ae613f7b547" id="sec.708B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A safety instruction is a direction requiring a person or the general public to do or not do something.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8866b12f-f740-49c0-a4b3-0dbf70ac977b" id="sec.708B-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the chief inspector believes there is a specific safety issue in relation to the petroleum or fuel gas industry, to geothermal activities or to GHG storage activities, the chief inspector may issue a safety alert or safety instruction to particular persons or the general public.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_db58fa7a-f678-4e03-8612-5e362d1a49de" id="sec.708B-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A safety alert or safety instruction—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_14dea0cb-c084-4801-a539-b577e57421cb" id="sec.708B-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must relate to a specific safety issue in relation to a matter mentioned in <intref check="valid" refid="sec.708B-ssec.3" target.guid="_8866b12f-f740-49c0-a4b3-0dbf70ac977b">subsection (3)</intref>; and</txt></block></li><li guid="_5a0fa73c-c38a-4978-8ea8-d6c891bc53bf" id="sec.708B-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">may be inconsistent with relevant safety requirements.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d6da9d95-90d3-40d7-8f2e-3e8ac70cc9b0" id="sec.708B-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If a safety instruction is inconsistent with a relevant safety requirement the safety instruction prevails.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_42ababec-1f95-48a9-b9f8-182d12e7d4e9" id="sec.708B-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">A safety alert or safety instruction is issued by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e826354d-16ce-4de6-9426-f1fcdc5c033e" id="sec.708B-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the announcement is to particular persons—giving written notice of the announcement to the persons; or</txt></block></li><li guid="_0f8f3678-d3d8-4db9-bb35-508a61deaba5" id="sec.708B-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the advice is to the general public in a particular area—publishing notice of the advice in a newspaper circulating in the area; or</txt></block></li><li guid="_74ed02dd-2096-4662-ada8-f3df965f0c62" id="sec.708B-ssec.6-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the advice is to the general public throughout the State—publishing notice of the advice in a newspaper circulating in each city in the State.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_4d1df70c-e701-4db7-8c6c-35132ae1696f" id="sec.708B-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">A safety instruction must also be published in the gazette.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_cf8ea531-c888-459e-957b-a75a17971215" id="sec.708B-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">A safety instruction stays in force until the earliest of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_df41b78b-b9b9-487d-b2c1-25c2b8fde073" id="sec.708B-ssec.8-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the expiration of 6 months after the day it is made;</txt></block></li><li guid="_9832f211-45ee-447f-bf83-6585599481ab" id="sec.708B-ssec.8-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the chief inspector cancels the instruction;</txt></block></li><li guid="_714cb542-4575-4b10-83d7-729f21f84776" id="sec.708B-ssec.8-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a regulation replaces the instruction.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_dc1400df-90b5-40bb-9e6c-4ea418e9178b" id="sec.708B-ssec.9" provision.type="other"><no>(9)</no><block><txt break.before="0">A safety instruction may be amended by the chief inspector while the instruction is in force, but an amendment can not extend the 6 months mentioned in <intref check="valid" refid="sec.708B-ssec.8" target.guid="_cf8ea531-c888-459e-957b-a75a17971215">subsection (8)</intref><intref check="valid" refid="sec.708B-ssec.8-para1.a" target.guid="_df41b78b-b9b9-487d-b2c1-25c2b8fde073">(a)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6c36ae11-34b2-4d92-9030-98be4bbc2100" id="sec.708B-ssec.10" provision.type="other"><no>(10)</no><block><txt break.before="0">A person to whom a safety instruction applies must comply with the instruction, unless the person has a reasonable excuse.</txt></block><penalty guid="_d573ad38-dc85-4639-84cb-0a713ecc4723" id="sec.708B-ssec.10-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_e2608870-4575-453a-98cc-dbb0593eb91e" id="ch.9-pt.4A"><no>Part 4A</no><heading guid="_3c7d9a6e-9012-4d0d-9fd7-9fd919f2fc80" id="ch.9-pt.4A-he">Other safety offences</heading><clause affected.by.uncommenced="0" guid="_00c68ca9-d8d1-4cf3-a91f-5898c8349a43" id="sec.708C" provision.type="other" spent.amends="0"><no>708C</no><heading guid="_3cab0492-bf3b-4039-b8b0-9e40d3c87915" id="sec.708C-he">Protection from reprisal</heading><subclause affected.by.uncommenced="0" guid="_1e990565-cc98-4c89-a488-dff0309902f3" id="sec.708C-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not cause, or attempt or conspire to cause, detriment to another person because, or in the belief that, the other person—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_53570959-14eb-4676-8007-1e8cb2935ab4" id="sec.708C-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">has made a complaint, or in any other way has raised, an operating plant safety issue; or</txt></block></li><li guid="_7ac6ff8f-6dcd-4a0b-bddf-9debcc64a01b" id="sec.708C-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">has contacted or given help to an official, an executive safety manager or a site safety manager in relation to an operating plant safety issue.</txt></block></li></list></block><penalty guid="_452c4dc3-9b8d-4af8-8178-a93219732e2e" id="sec.708C-ssec.1-pen"><block><txt break.before="1">Maximum penalty—40 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_5922b454-9378-465a-a522-04737c66fd81" id="sec.708C-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An attempt to cause detriment includes an attempt to induce a person to cause detriment.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_825c4eb9-5d3e-47ca-b622-7a2b266b2cc3" id="sec.708C-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A contravention of <intref check="valid" refid="sec.708C-ssec.1" target.guid="_1e990565-cc98-4c89-a488-dff0309902f3">subsection (1)</intref> is a reprisal or the taking of a reprisal.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a18b3be4-3004-47aa-aaa7-db756b1618ae" id="sec.708C-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A ground mentioned in <intref check="valid" refid="sec.708C-ssec.1" target.guid="_1e990565-cc98-4c89-a488-dff0309902f3">subsection (1)</intref> as the ground for a reprisal is the unlawful ground for the reprisal.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0e323e65-c751-4993-b6d3-264812d055da" id="sec.708C-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">For the contravention to happen, it is sufficient if the unlawful ground is a substantial ground for the act or omission that is the reprisal, even if there is another ground for the act or omission.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_359573fb-5178-4f4a-87d4-0f49ae621236" id="sec.708C-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">This section does not limit or otherwise affect the operation of the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-038" target.version.series="422aa448-617e-4be5-82f4-cfaac272a412" type="act"><name emphasis="yes">Public Interest Disclosure Act 2010</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.4" target.doc.id="act-2010-038" target.guid="_f7770692-0134-48db-a542-1038f2a39b1a" target.version.series="422aa448-617e-4be5-82f4-cfaac272a412" type="act">chapter 4</legref>, <legref check="valid" jurisd="QLD" refid="ch.4-pt.1" target.doc.id="act-2010-038" target.guid="_f4e91279-0853-49f7-b5c6-8a5d9ea22f7d" target.version.series="422aa448-617e-4be5-82f4-cfaac272a412" type="act">part 1</legref> in relation to reprisals.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_374f0056-4e17-443d-9cde-33296e3e6663" id="sec.708C-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_539922a7-eff6-4d78-b96a-0b198a3a7f67" id="sec.708C-ssec.7-def.operatingplantsafetyissue_"><txt break.before="1"><defterm guid="_eca9498f-e3ef-4087-a898-cb114f282698" id="sec.708C-ssec.7-def.operatingplantsafetyissue" type="definition">operating plant safety issue</defterm> means an issue about the safety or health of a person or persons while at an operating plant or as a result of operating plant operations.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_34de53ae-2a65-4646-b232-3cb3b0ef3eae" id="sec.708D" provision.type="other" spent.amends="0"><no>708D</no><heading guid="_331d9816-bee9-4e5d-886a-cb049a5fde18" id="sec.708D-he">Damages entitlement for reprisal</heading><subclause affected.by.uncommenced="0" guid="_d5a06bec-ce1c-4ece-bf8c-5e26898a1228" id="sec.708D-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A reprisal is a tort and a person who takes a reprisal is liable in damages to anyone who suffers detriment as a result.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a4214ab7-fb90-4767-85a6-726decbb58f2" id="sec.708D-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Any appropriate remedy that may be granted by a court for a tort may be granted by a court for the taking of a reprisal.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1aa68bb5-490b-49ef-80d1-b14912f72824" id="sec.708D-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the claim for the damages goes to trial in the Supreme Court or the District Court, it must be decided by a judge sitting without a jury.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a0c98ca9-48b3-43e2-a63b-d6e053c23383" id="sec.708E" provision.type="other" spent.amends="0"><no>708E</no><heading guid="_8421a6ae-d646-4940-b6e1-3ce713549ac4" id="sec.708E-he">Children under 16 not to operate plant or equipment</heading><block><txt break.before="1">The operator of an operating plant must not allow a person under the age of 16 to operate or maintain equipment or machinery at the plant.</txt></block><penalty guid="_e16bff3a-cb67-46fe-a4ff-d6da41c8a5bf" id="sec.708E-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></clause></part><part affected.by.uncommenced="0" guid="_9becdcc5-d9d3-4f0b-a565-32a26d008d9a" id="ch.9-pt.5"><no>Part 5</no><heading guid="_8befd5e2-4602-4da0-936c-4fb6b7c9a7b7" id="ch.9-pt.5-he">Boards of inquiry</heading><division affected.by.uncommenced="0" guid="_0060bb4c-b757-4dc2-8c4b-ac31c378be86" id="ch.9-pt.5-div.1"><no>Division 1</no><heading guid="_d77fbcf5-f0df-47ea-906a-b816fac509b1" id="ch.9-pt.5-div.1-he">Establishment and functions</heading><clause affected.by.uncommenced="0" guid="_82eafb58-a140-4633-a10b-d5d5f2ad7b78" id="sec.709" provision.type="other" spent.amends="0"><no>709</no><heading guid="_6eda9374-45d5-4e4a-9853-401c31d99b7c" id="sec.709-he">Minister may establish board of inquiry</heading><subclause affected.by.uncommenced="0" guid="_0e83b727-2614-4f9c-8ebe-0db8628f070e" id="sec.709-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may, by gazette notice, establish a board of inquiry for a prescribed incident, other than an accident or incident for which a board of inquiry has been established under the <legref check="valid" jurisd="QLD" target.doc.id="act-1999-039" target.version.series="aa8f4811-7589-4cef-8731-c79d6cf94546" type="act"><name emphasis="no">Coal Mining Safety and Health Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.202" target.doc.id="act-1999-039" target.guid="_a74fc360-9046-42b8-b209-ff6d503eeea8" target.version.series="aa8f4811-7589-4cef-8731-c79d6cf94546" type="act">section 202</legref><legref check="invalid" jurisd="QLD" type="act">(1)</legref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6acb6c54-7594-42a6-9198-ba508fde4fc3" id="sec.709-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must state matters relevant to the inquiry, including, for example, its chairperson and terms of reference.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2472f224-6c90-4873-a624-52734ec70350" id="sec.710" provision.type="other" spent.amends="0"><no>710</no><heading guid="_e94feead-65ce-4ec0-be32-7732aa510451" id="sec.710-he">Membership of board</heading><subclause affected.by.uncommenced="0" guid="_951ace1c-2e9b-4fdc-8c4f-62dd3b42ccc6" id="sec.710-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A board of inquiry must consist of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_881125b2-786f-4f4d-a0c5-8cc00020d1a3" id="sec.710-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a magistrate; and</txt></block></li><li guid="_5b38ed3a-caaa-489a-988e-09dab814cd5c" id="sec.710-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">no more than 3 independent persons with appropriate expert knowledge relevant to the prescribed incident the subject of the inquiry.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_66a5d782-c03c-495c-90b1-12d597eec506" id="sec.710-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister must appoint the members of the board of inquiry.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_cd182d1e-92f6-4c2b-a5f0-76640a970f73" id="sec.710-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The magistrate is chairperson of the board.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d0006069-5ed0-4004-a8b2-6a8c11ab9a8c" id="sec.711" provision.type="other" spent.amends="0"><no>711</no><heading guid="_549cd3ef-657f-4eeb-8d16-8d4fa1c49c70" id="sec.711-he">Board’s functions</heading><subclause affected.by.uncommenced="0" guid="_73c1e82b-9d11-4c66-bc95-ad3aca5f6085" id="sec.711-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A board of inquiry must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_aca4f4c8-1e98-403e-bf5b-52613ab957d2" id="sec.711-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">inquire into the circumstances and probable causes of the prescribed incident the subject of the inquiry; and</txt></block></li><li guid="_3d54d2a2-de5b-4a61-9ecb-c87acb842c93" id="sec.711-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give the Minister a report of the board’s findings as to the cause of the prescribed incident.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_59879919-659a-4d85-8511-5c4b315f54e3" id="sec.711-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The report must record the recommendations the board considers appropriate and other relevant matters.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_05a3c334-1697-4e4b-a4d5-639a03404e70" id="sec.711-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister must publish the recommendations in the way the Minister considers appropriate.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_96817483-ad4d-4a55-9fed-a049b48cb870" id="ch.9-pt.5-div.2"><no>Division 2</no><heading guid="_4c872edd-ffad-45d2-b980-0f864bf65ed5" id="ch.9-pt.5-div.2-he">Conduct of inquiry</heading><clause affected.by.uncommenced="0" guid="_1364fd24-ce84-4da2-aec2-b2845de2f9bb" id="sec.712" provision.type="other" spent.amends="0"><no>712</no><heading guid="_bb8d6591-d71c-497a-8b8d-aaf64afa272e" id="sec.712-he">Notice of inquiry</heading><block><txt break.before="1">The chairperson of a board of inquiry must give at least 14 days notice of the time and place of the inquiry to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b6f1f138-d665-458f-9bf4-dfa6969b8185" id="sec.712-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">anyone the chairperson considers may be concerned with the prescribed incident the subject of the inquiry; and</txt></block></li><li guid="_e378feb0-b259-4a62-9e27-6ddac8be51ef" id="sec.712-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">anyone else the chairperson reasonably believes should be given the opportunity to appear at the inquiry.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_0a3520d3-99cc-4d66-a751-06706a2c0b02" id="sec.713" provision.type="other" spent.amends="0"><no>713</no><heading guid="_873dadd1-8943-46de-9b09-64c02d9e58b8" id="sec.713-he">Inquiry procedures</heading><block><txt break.before="1">A board of inquiry, in conducting its inquiry—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a7c5e24b-1d7a-4f5a-a097-cd76b4d6f74e" id="sec.713-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must observe natural justice; and</txt></block></li><li guid="_a767ae3a-6bd0-4333-a5de-bafff088fd83" id="sec.713-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">must act as quickly, and with as little formality and technicality, as is consistent with a fair and appropriate consideration of the issues; and</txt></block></li><li guid="_3171b8be-d3bb-4ca5-b8ea-09e23a2193b8" id="sec.713-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">is not bound by the rules of evidence; and</txt></block></li><li guid="_b0ffc86d-b060-44cd-9ecb-0636a0916b4b" id="sec.713-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">may conduct itself in a way it considers appropriate, including, for example, by holding hearings; and</txt></block></li><li guid="_6d2695f9-9e46-4185-97ea-c27f5b90ae3b" id="sec.713-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">must keep a record of its proceedings; and</txt></block></li><li guid="_236a2bcf-91e6-4875-bd8f-a19d923400d1" id="sec.713-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">must comply with this division and procedural rules prescribed under a regulation.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_5b7bcda7-ab39-4deb-af79-b8e4d017bd07" id="sec.714" provision.type="other" spent.amends="0"><no>714</no><heading guid="_076e269f-09ee-4d6d-a351-d1bf1e0e22dd" id="sec.714-he">Inquiry to be public unless board directs</heading><subclause affected.by.uncommenced="0" guid="_a6e1adb2-6c8e-43fc-836a-9e3b9f57001c" id="sec.714-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A board or inquiry must hold its inquiry in public.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_44c87364-5c2c-4175-9667-3c958f5b5783" id="sec.714-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the board may, of its own initiative or on the application of a person represented at the inquiry—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_55dc0500-e447-4db6-afec-fa7b55c76713" id="sec.714-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">direct the inquiry, or part of the inquiry, be held in private; and</txt></block></li><li guid="_31fa6393-80f0-4fa1-88af-f26b0e0dffc6" id="sec.714-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give directions about who may be present.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a4a1eb17-bf5e-437c-ad8b-21d9ec62a5e0" id="sec.714-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The board may give a direction under <intref check="valid" refid="sec.714-ssec.2" target.guid="_44c87364-5c2c-4175-9667-3c958f5b5783">subsection (2)</intref> only if it is satisfied it is appropriate to do so.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_dd44b246-ec7c-4166-a125-4aef82f98466" id="sec.715" provision.type="other" spent.amends="0"><no>715</no><heading guid="_1c28bd2f-9ed4-4e95-84db-953d6398890a" id="sec.715-he">Protection of members, representatives and witnesses</heading><subclause affected.by.uncommenced="0" guid="_3889248a-8c02-4cab-a53b-724739b50e30" id="sec.715-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A member of the board of inquiry has, in performing the member’s functions, the same immunity and protection as a Supreme Court judge.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_62141566-88cb-4970-980b-b53e4f35ced9" id="sec.715-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A lawyer or other person appearing before the board for someone else has the same immunity and protection as a barrister appearing for a party in a proceeding in the Supreme Court.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_49550f51-15f1-4899-a6b2-d8d8f8d7d6e2" id="sec.715-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A person summoned to attend or appearing before the board as a witness has the same protection as a witness in a proceeding in the Supreme Court.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_ffbacc6a-0c8d-4e94-ad40-00f8c293873a" id="sec.716" provision.type="other" spent.amends="0"><no>716</no><heading guid="_4536bd58-0496-421f-8296-ace31f0c4afc" id="sec.716-he">Board’s powers for inquiry</heading><subclause affected.by.uncommenced="0" guid="_b967d135-88fc-47ed-adf3-f23939095d70" id="sec.716-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A board of inquiry, in conducting its inquiry, may if it considers it appropriate—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f9905522-b3c0-4068-a4ff-cc2715a71dd7" id="sec.716-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">act in the absence of a person given notice of the inquiry or some other reasonable notice; and</txt></block></li><li guid="_31ced305-8094-4785-88af-3f47417f3493" id="sec.716-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">receive evidence on oath or by statutory declaration; and</txt></block></li><li guid="_fa6f688b-a2c9-43ef-9065-58720224bcb0" id="sec.716-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">adjourn the inquiry; and</txt></block></li><li guid="_6a5bccd4-df02-4b5a-b365-cbdab7daa222" id="sec.716-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">disregard a defect, error, omission or insufficiency in a document.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_be556fe1-cd07-4039-938b-866a663363a1" id="sec.716-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chairperson of the board may administer an oath to a person appearing as a witness before the inquiry.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e77a53a3-9cc3-49fb-95d4-960122c10e3e" id="sec.717" provision.type="other" spent.amends="0"><no>717</no><heading guid="_11192338-9da2-4838-a62a-e3f8178e96cd" id="sec.717-he">Who may participate at inquiry</heading><block><txt break.before="1">A person given notice of the inquiry may call, examine, cross-examine and re-examine witnesses, personally or by lawyer or another agent.</txt></block></clause><clause affected.by.uncommenced="0" guid="_0e45802a-fc39-4393-a6b7-6d5266f0837a" id="sec.718" provision.type="other" spent.amends="0"><no>718</no><heading guid="_7ff4ae5f-1bd5-4f37-b1cd-473d5296d7de" id="sec.718-he">Witnesses</heading><subclause affected.by.uncommenced="0" guid="_8a698e9d-2077-41b1-a02a-5ab6d24e8e71" id="sec.718-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chairperson may, by a notice given to a person (a <defterm guid="_bd5c639f-16f2-4c4f-8ee2-f8bcbe3bbf28" id="sec.718-def.witness" type="definition">witness</defterm>), require the person to attend the inquiry at a stated time and place to give evidence or produce stated documents or things.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3bf28706-22ba-4163-b1c8-cc8cbf3c56a4" id="sec.718-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A witness must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3f161874-3048-4387-9021-4cf1c9b66be7" id="sec.718-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">comply with the notice unless the witness has a reasonable excuse; or</txt></block></li><li guid="_19c6804d-eaa5-452d-b335-2318775bad8e" id="sec.718-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">continue to attend as required by the chairperson unless the witness has a reasonable excuse.</txt></block></li></list></block><penalty guid="_ef660a84-a399-42ce-a15d-253473bcc947" id="sec.718-ssec.2-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_cd2b26f3-c79a-4bf0-83e5-0990f4b78ba0" id="sec.718-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The chairperson must pay a witness the witness fee prescribed under a regulation or, if no fee is prescribed, the fee the chairperson considers to be reasonable.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6c114379-7b1a-435f-8468-f77ea31ba51f" id="sec.718-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A witness must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a6197bbc-b6fc-4c93-88ca-2718d0928ec7" id="sec.718-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">take an oath, or make an affirmation, when required to do so by the chairperson; or</txt></block></li><li guid="_9133339f-9bef-4c53-816a-96fdec8a7b0b" id="sec.718-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">answer a question or produce a document or thing when required to do so by the chairperson unless the person has a reasonable excuse.</txt></block></li></list></block><penalty guid="_e08541a3-7b53-4c2d-8eef-1714f4b20977" id="sec.718-ssec.4-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_add481ab-c7dd-4a42-890a-59771e11cccd" id="sec.718-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">It is a reasonable excuse for an individual if answering the question or producing the document or thing might tend to incriminate the individual or make the individual liable to a penalty.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b0a0751d-fe7e-4dab-ac25-08fab0b943c1" id="sec.719" provision.type="other" spent.amends="0"><no>719</no><heading guid="_4dad77fa-bd16-40fb-83d4-4b4c3efd304d" id="sec.719-he">Inspection by board of documents or things</heading><subclause affected.by.uncommenced="0" guid="_89598e93-3129-40ee-93d6-a5bc6f65d238" id="sec.719-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a document or thing is produced at the inquiry, the board may—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7335940c-4dc2-4282-81d3-718a8ba5b331" id="sec.719-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">inspect the document or thing; and</txt></block></li><li guid="_29064673-ddcc-4e95-8ebd-be245b07b223" id="sec.719-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">make copies of, photograph, or take extracts from, the document or thing if it is relevant to the inquiry.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d5c15797-3030-4146-bd55-e5dc2132fc60" id="sec.719-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The board may also take possession of the document or thing, and keep it while it is necessary for the inquiry.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a3c576a3-637d-4f7d-bd9d-ab10f6eb9e9a" id="sec.719-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">While it keeps a document or thing, the board must allow a person otherwise entitled to possession of the document or thing to inspect, make copies of, photograph, or take extracts from, the document or thing, at a place and time the board considers to be reasonable.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_250803c6-7af9-4a0b-b97b-e0f7ecbce04c" id="ch.9-pt.5-div.3"><no>Division 3</no><heading guid="_ac8cd740-8e65-4f54-ad8b-9881234d75e1" id="ch.9-pt.5-div.3-he">Miscellaneous provisions</heading><clause affected.by.uncommenced="0" guid="_008b4979-fc0c-4a35-9036-83e5ef4a4036" id="sec.720" provision.type="other" spent.amends="0"><no>720</no><heading guid="_c7cf35f3-109b-49cc-8928-af0bcff4ea52" id="sec.720-he">Relationship with proceedings</heading><block><txt break.before="1">A board of inquiry may start, continue or finish its proceedings, and a report may be prepared or given, despite a proceeding, unless a court or tribunal of competent jurisdiction orders otherwise.</txt></block></clause><clause affected.by.uncommenced="0" guid="_2cde7abd-34a7-4693-a988-98af88234def" id="sec.721" provision.type="other" spent.amends="0"><no>721</no><heading guid="_d16818bf-c1f4-4c62-968c-7de99ec6dbd9" id="sec.721-he">False or misleading statements or document to board</heading><subclause affected.by.uncommenced="0" guid="_9bf99a40-ce4a-4297-becb-47dfad5ca43b" id="sec.721-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not state anything to a board of inquiry that the person knows is false or misleading in a material particular.</txt></block><penalty guid="_015d3a97-f591-4f3e-ab2a-93ad85dbe669" id="sec.721-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty><note guid="_a6094573-4675-4ba4-a53c-bda53742dd6b" id="sec.721-ssec.1-note" type="example"><heading guid="_4d49bed2-dab5-48c0-9f61-10964e5fca81" id="sec.721-ssec.1-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_f344a215-36da-4016-8c65-9d19188d828e" id="sec.721-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A person must not give a board of inquiry a document or thing the person knows is false or misleading in a material particular.</txt></block><penalty guid="_665aaf32-a0cf-446c-a213-4775d5941065" id="sec.721-ssec.2-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty><note guid="_9fe14b6a-224c-46f2-b104-bbde10e63e11" id="sec.721-ssec.2-note" type="example"><heading guid="_184c0c6c-b3d0-4b0f-90b3-642d96c7c956" id="sec.721-ssec.2-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause></clause><clause affected.by.uncommenced="0" guid="_b17c7c89-7001-46cb-9706-f270ee387a09" id="sec.722" provision.type="other" spent.amends="0"><no>722</no><heading guid="_b763adcd-274b-4fd3-8e55-fc77c1765928" id="sec.722-he">Contempt of board</heading><block><txt break.before="1">A person must not—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_928d6a92-d0a0-4d81-8b24-db2d64b58430" id="sec.722-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">insult a board of inquiry; or</txt></block></li><li guid="_c469b322-a8e9-46c3-8cfb-8dbff6f21a75" id="sec.722-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">deliberately interrupt an inquiry of a board of inquiry; or</txt></block></li><li guid="_dfb82144-7d46-488c-a133-83a686d237a1" id="sec.722-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">create or continue, or join in creating or continuing, a disturbance in or near a place where a board of inquiry is conducting its inquiry; or</txt></block></li><li guid="_664575cc-03cd-49be-98c5-982d0f2a8792" id="sec.722-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">do anything that would be contempt of court if a board of inquiry were a judge acting judicially.</txt></block></li></list></block><penalty guid="_ddab52b7-0677-49a7-ad82-fbe67c839d04" id="sec.722-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></clause><clause affected.by.uncommenced="0" guid="_8f5bc5af-8d3f-4fcc-802b-65be5cf7cdd8" id="sec.723" provision.type="other" spent.amends="0"><no>723</no><heading guid="_b358592c-0ab4-4bbe-979c-88a35468c32f" id="sec.723-he">Change of board membership</heading><block><txt break.before="1">A board of inquiry is not affected by a change in its membership.</txt></block></clause></division></part><part affected.by.uncommenced="0" guid="_d6052195-5e83-4b3d-b73c-2e57547f2071" id="ch.9-pt.6"><no>Part 6</no><heading guid="_52d592e2-b038-46f9-b117-bf1fb05e413a" id="ch.9-pt.6-he">Restrictions on gas work</heading><division affected.by.uncommenced="0" guid="_398de161-07b0-49e0-a265-a471cf6b1453" id="ch.9-pt.6-div.1"><no>Division 1</no><heading guid="_5921a27c-c4e7-40aa-895a-2ea125a0f80b" id="ch.9-pt.6-div.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_8b3a81c4-b76c-4e2f-b482-282f9dfea987" id="sec.724" provision.type="other" spent.amends="0"><no>724</no><heading guid="_aa34385a-daa9-455f-88d4-fcc705256171" id="sec.724-he">Types of gas device</heading><subclause affected.by.uncommenced="0" guid="_ce85ad44-f0d5-41ab-86c7-d591754b4c0a" id="sec.724-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A <defterm guid="_1697d142-6398-4225-ac8a-69870cc64158" id="sec.724-def.gasdevicetypeA" type="definition">gas device (type A)</defterm> is a device used or designed or intended for use for a purpose mentioned in <intref check="valid" refid="sec.724-ssec.2" target.guid="_64723a83-e347-4ca3-9fde-6270752c7bb8">subsection (2)</intref>, and prescribed under a regulation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_64723a83-e347-4ca3-9fde-6270752c7bb8" id="sec.724-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.724-ssec.1" target.guid="_ce85ad44-f0d5-41ab-86c7-d591754b4c0a">subsection (1)</intref>, the purposes are—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d2f81df1-7729-4f3d-8e76-2d9a397a5592" id="sec.724-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for production of heat, light or power using fuel gas; or</txt></block></li><li guid="_9469d3de-c3e7-4b74-be1a-e1e485b2906b" id="sec.724-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for refrigeration for which fuel gas is the fuel; or</txt></block></li><li guid="_3d21a237-2d2d-42ea-921d-c06256a0a860" id="sec.724-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">as a propellant.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_32526ff4-c63c-4202-9d7a-bf73da05c6bc" id="sec.724-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A <defterm guid="_1b5a04ca-712e-4c49-bb31-0769d3f18cd9" id="sec.724-def.gasdevicetypeB" type="definition">gas device (type B)</defterm> is any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3d0594dc-affa-4620-b46c-c944a72cd701" id="sec.724-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a device, or system of devices, other than a gas device (type A), that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bffda402-ec30-40ea-8af7-0dd1eaa09bf7" id="sec.724-ssec.3-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">is used or designed or intended for use for a purpose mentioned in <intref check="valid" refid="sec.724-ssec.2" target.guid="_64723a83-e347-4ca3-9fde-6270752c7bb8">subsection (2)</intref>; or</txt></block></li><li guid="_369ff089-c320-44ae-a89a-3e51657943aa" id="sec.724-ssec.3-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">is used or designed or intended for use in a manufacturing process if the device uses fuel gas; or</txt></block></li><li guid="_c7dcad74-7bb0-4351-8616-104b73119efc" id="sec.724-ssec.3-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">is a fuel gas refrigeration device;</txt></block></li></list></block></li><li guid="_f921e9f4-7887-4d91-a562-9fbff6f3b8b1" id="sec.724-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a gas flare;</txt></block></li><li guid="_0ca6852a-6415-42b0-a28d-600d23d1a1e7" id="sec.724-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a thermal oxidiser.</txt></block></li></list><note guid="_81c054f6-fa9b-4832-8a54-e19abe3f5b55" id="sec.724-ssec.3-note" type="example"><heading guid="_ae6999de-2d2c-48eb-90e7-e27be0d2efc3" id="sec.724-ssec.3-note-he">Examples of gas devices (type B)—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_d6cf3733-9b43-4d09-8eda-f938767a71eb" id="sec.724-ssec.3-note-para1" provision.type="other"><no>•</no><block><txt break.before="0">a fuel gas system for a motor vehicle or vessel</txt></block></li><li guid="_8c2f58ec-c23f-4189-a51c-1ae6edb7cf0a" id="sec.724-ssec.3-note-para1-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">a gas fired boiler at a major industrial plant</txt></block></li></list></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_287cfa23-bb4d-4b0d-b789-4f47f249c277" id="sec.724-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">To remove any doubt, it is declared that an industrial facility constructed for the purpose of producing liquified gas is not, of itself, a fuel gas refrigeration device.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ef08342f-288d-4b28-9951-df54b9d8a77a" id="sec.724-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_0f83ef0e-55ef-4110-ba9a-8fc2324fb41f" id="sec.724-ssec.5-def.gasflare_"><txt break.before="1"><defterm guid="_b0f4ed38-29fa-4990-848d-dd6cc0783310" id="sec.724-ssec.5-def.gasflare" type="definition">gas flare</defterm> means a device that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b651b7eb-99d6-4154-8b19-f4561f3fd6fd" id="sec.724-ssec.5-def.gasflare-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">uses combustion to dispose of fuel gas; and</txt></block></li><li guid="_e5325987-058e-4cf0-82d7-451a337bf271" id="sec.724-ssec.5-def.gasflare-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is prescribed under a regulation.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_0f24e251-99c9-405b-9eed-f2fd33fe07bc" id="sec.724-ssec.5-def.thermaloxidiser_"><txt break.before="1"><defterm guid="_7b744961-748e-4455-94c5-2a977c64fb09" id="sec.724-ssec.5-def.thermaloxidiser" type="definition">thermal oxidiser</defterm> means a device that uses a chemical reaction to reduce or remove gaseous pollutants from a mixture of gases that includes fuel gas, as part of an industrial process.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_632ab8b4-1aa3-486c-af20-0d428ca78f78" id="sec.725" provision.type="other" spent.amends="0"><no>725</no><heading guid="_06d7feea-e6c0-46cc-a51d-78f40185f294" id="sec.725-he">What is <defterm guid="_fe8e7c08-ffea-41a4-9363-eae434c82435" type="mention">gas work</defterm></heading><block><txt break.before="1"><defterm guid="_701ecd97-6fbf-485e-b1eb-36b9ea21bd92" id="def.Gaswork" type="definition">Gas work</defterm> is the work of installing, removing, altering, repairing, servicing, testing or certifying a gas system.</txt></block></clause></division><division affected.by.uncommenced="0" guid="_f02cfcbc-ec6e-43c2-bead-3d8db2f1c692" id="ch.9-pt.6-div.2"><no>Division 2</no><heading guid="_e295769a-ef15-405e-b619-cfafd74008e4" id="ch.9-pt.6-div.2-he">Restrictions</heading><clause affected.by.uncommenced="0" guid="_25d185d3-8829-4dd4-bc5a-dbe8d2e7d3b8" id="sec.726" provision.type="other" spent.amends="0"><no>726</no><heading guid="_3f5dfb1c-0226-447d-ba6d-72b7665cea53" id="sec.726-he">Gas work for which licence is required</heading><subclause affected.by.uncommenced="0" guid="_74d13463-d708-4288-9dff-bbf8a13c3a82" id="sec.726-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not carry out gas work in relation to the following unless the person holds a gas work licence that allows the person to carry out the work—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_27abb24a-1cb4-4458-9c70-d7ed404e4609" id="sec.726-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a gas device (type A);</txt></block></li><li guid="_445447ba-6a26-4a9c-932b-a86c204aeef1" id="sec.726-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a fuel gas refrigeration device.</txt></block></li></list></block><penalty guid="_32fd63cf-92de-4ac7-814e-cc48b273aa69" id="sec.726-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_3cc3c0cb-ffa4-40b3-be2d-3441623f40be" id="sec.726-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A person must not direct a worker at a place to carry out gas work in relation to a gas device mentioned in <intref check="valid" refid="sec.726-ssec.1" target.guid="_74d13463-d708-4288-9dff-bbf8a13c3a82">subsection (1)</intref> unless the worker holds a gas work licence that allows the worker to carry out the work.</txt></block><penalty guid="_b51c797b-bfbd-434c-850b-1ec783150643" id="sec.726-ssec.2-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_6c43bf5d-3327-412f-be8a-a09342c611c3" id="sec.726-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A person must not direct a worker at a place to carry out gas work relating to a gas device mentioned in <intref check="valid" refid="sec.726-ssec.1" target.guid="_74d13463-d708-4288-9dff-bbf8a13c3a82">subsection (1)</intref> in a way that contravenes a relevant safety requirement.</txt></block><penalty guid="_36cbcc48-89d9-4270-9fd2-ab414fc358b5" id="sec.726-ssec.3-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_db870197-a455-4f51-83d7-416b6abe183c" id="sec.726-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A person does not commit an offence against <intref check="valid" refid="sec.726-ssec.1" target.guid="_74d13463-d708-4288-9dff-bbf8a13c3a82">subsection (1)</intref> if the gas work is only the connection or disconnection of a gas cylinder to an existing gas fitting or gas device.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8ff1155b-e663-44a0-9570-dd64cb8f9aa9" id="sec.726-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">This section does not apply to gas work carried out by a person under a safety management system for an operating plant in circumstances prescribed by regulation.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_54e80355-83dc-4c4b-ad39-726ca3e8d159" id="sec.727" provision.type="other" spent.amends="0"><no>727</no><heading guid="_4014e150-d934-4308-be85-668baf720fd5" id="sec.727-he">Gas work for which authorisation is required</heading><subclause affected.by.uncommenced="0" guid="_c260fac7-ae9f-4b7f-a000-1d2266ea3276" id="sec.727-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not carry out gas work in relation to a gas device (type B) unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b5e81ce6-0459-45cc-91f9-a3b682d45f28" id="sec.727-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a gas work authorisation has been issued for the device; and</txt></block></li><li guid="_b31426b8-37a7-48f8-9d89-f4d7f3114a84" id="sec.727-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the person holds the authorisation, or is acting under the holder’s authority; and</txt></block></li><li guid="_4cd59803-4e2c-41c6-9edf-207aa2e411a1" id="sec.727-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the work complies with the authorisation.</txt></block></li></list></block><penalty guid="_10d910fb-b76a-45f1-9bd4-089a8e536456" id="sec.727-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty><note guid="_34c1c4c1-6143-41f4-8b3f-839ed3d665f7" id="sec.727-ssec.1-note" type="example"><heading guid="_45fb85e4-7966-4ad2-bcae-fcc4a45b8faa" id="sec.727-ssec.1-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_1a0de1e7-090c-4f73-8b4b-2bc0216ddad2" id="sec.727-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.727-ssec.1" target.guid="_c260fac7-ae9f-4b7f-a000-1d2266ea3276">subsection (1)</intref> does not apply to a fuel gas refrigeration device.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_79dd0b79-50ec-4bd5-8640-f001f472af9e" id="sec.727-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A person does not commit an offence under <intref check="valid" refid="sec.727-ssec.1" target.guid="_c260fac7-ae9f-4b7f-a000-1d2266ea3276">subsection (1)</intref> if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c9f23cb3-738f-4881-86dd-eb77e5885b11" id="sec.727-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the gas work is carried out at an operating plant under a safety management system, other than a safety management system that is a generic SMS for that stage of the plant, and the person carrying out the work has been assessed as competent to carry out the work under the system; or</txt></block></li><li guid="_a2ea750b-447f-4b9b-a82d-e013cacba9ab" id="sec.727-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the gas work is gas work relating to pipes used to supply gas to a gas device (type B), and the person carrying out the work holds a gas work licence that allows the person to carry out that work; or</txt></block></li><li guid="_021d983d-46f9-49af-8361-d20c23a49f7d" id="sec.727-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the gas work is carried out at a facility that has, under the <legref check="valid" jurisd="QLD" target.doc.id="act-2011-018" target.version.series="192711dc-f0de-4bcb-809d-080b81854cef" type="act"><name emphasis="yes">Work Health and Safety Act 2011</name></legref>, been classified as a major hazard facility, if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b4a910fd-3ed8-4bca-98ef-50709d423086" id="sec.727-ssec.3-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the work is carried out under a safety management system under that Act; and</txt></block></li><li guid="_85fcef0e-5c35-4dcf-9222-bff2ae2daf8f" id="sec.727-ssec.3-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the person carrying out the work has been assessed, under the safety management system, as competent to carry out the work.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9d20f445-0a78-4d15-9627-b88669222e8f" id="sec.727-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A person must not direct a worker at a place to carry out gas work relating to a gas device (type B) in a way that contravenes a relevant safety requirement.</txt></block><penalty guid="_ba84e2d3-6e7c-4a38-8d65-d1088d23c81c" id="sec.727-ssec.4-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty><note guid="_84b6fe3a-a2ec-4b19-8b85-38419bcb97f7" id="sec.727-ssec.4-note" type="example"><heading guid="_18f237bd-c441-4d2f-99f6-3eb15e5e8eec" id="sec.727-ssec.4-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause></clause></division><division affected.by.uncommenced="0" guid="_2bf72288-2915-4eb2-8b1c-7c5765215301" id="ch.9-pt.6-div.3"><no>Division 3</no><heading guid="_58dff48b-2eae-495a-ba2e-2c1e76d73916" id="ch.9-pt.6-div.3-he">Gas work licences and authorisations</heading><subdivision affected.by.uncommenced="0" change="delStruct" guid="_0e34a231-9923-442c-96b2-99248be81474-del" id="ch.9-pt.6-div.3-sdiv.1-del"><no>Subdivision 1</no><heading guid="_a66a286a-06e9-4a59-b283-654da842ed8e-del" id="ch.9-pt.6-div.3-sdiv.1-he-del">Applying for and obtaining gas work licence or authorisation</heading><clause affected.by.uncommenced="0" guid="_e3961570-09cf-4364-9e76-16b518975aa0" id="sec.728" provision.type="other" spent.amends="0"><no>728</no><heading guid="_4bb327ba-64fd-4992-95e0-ab4e67e506cb" id="sec.728-he">Who may apply</heading><subclause affected.by.uncommenced="0" guid="_6a9ce7fc-1d52-4be6-9281-48073641bffd" id="sec.728-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An individual may apply to the chief inspector for a gas work licence to carry out gas work in relation to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_560d5a37-31ea-46f7-a6f8-44296f245fb4" id="sec.728-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a gas device (type A) or a type of gas device (type A); or</txt></block></li><li guid="_3f687758-ddef-4564-baca-5bd562dd27b1" id="sec.728-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a fuel gas refrigeration device or a type of fuel gas refrigeration device.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_44a16442-c476-47fb-b3d6-7270b90b1627" id="sec.728-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An individual or a corporation may apply to the chief inspector for a gas work authorisation for a gas device (type B) or a type of gas device (type B), other than a fuel gas refrigeration device.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b20668c9-b000-4a21-a103-95db9f9145bb" id="sec.728-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the applicant is an individual, the application may also seek an endorsement on any gas work licence issued that its holder also carries out work in relation to gases other than fuel gases.</txt><note guid="_5032c6fa-c9fe-48f8-88dd-112dbbbbbcd9" id="sec.728-ssec.3-note" type="example"><heading guid="_8243375e-411a-4c62-8548-fa819556bd17" id="sec.728-ssec.3-note-he">Example—</heading><block><txt break.before="1">an endorsement that the holder carries out work in relation to the use of hydrogen as transport fuel or the use of oxygen for medical purposes</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a4478cad-f4a0-4023-978e-651fe6c0b7be" id="sec.728A" provision.type="other" spent.amends="0"><no>728A</no><heading guid="_7b8779a0-ab14-4090-9ac2-5b4d0e1d8cbc" id="sec.728A-he">Requirements for application</heading><block><txt break.before="1">The application must be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_43e7bfdc-0307-4b2b-bc5e-b220a754d6d3" id="sec.728A-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in the approved form; and</txt></block></li><li guid="_6a695cb8-bc35-4fdb-9005-19e46542d7a0" id="sec.728A-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">accompanied by the fee prescribed under a regulation.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_e9c839db-d0c7-4cee-8ae4-95159d1e06ee" id="sec.728B" provision.type="other" spent.amends="0"><no>728B</no><heading guid="_bfdc3dfd-3abb-465a-8180-92b95b307fa5" id="sec.728B-he">Interim licence or authorisation</heading><subclause affected.by.uncommenced="0" guid="_9f6dc62c-2e71-4e89-a14e-e86c3412e4e6" id="sec.728B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the chief inspector considers that the applicant has not adequately demonstrated that the applicant has the competencies and experience to hold the gas work licence or authorisation applied for.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_de974e9b-a3b4-494e-a630-afc3a6158056" id="sec.728B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief inspector may grant the applicant an interim gas work licence or authorisation (the <defterm guid="_4474cd15-3834-4a42-beb0-18723f9eecdd" id="sec.728B-def.interimauthority" type="definition">interim authority</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6886cffc-ad09-48e3-8d75-76737497a386" id="sec.728B-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief inspector may impose conditions on the interim authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6bf55882-afef-421d-b37d-e2d1f01d21d1" id="sec.728B-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The interim authority must be for a stated term of no more than 3 years.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1402f11d-d7d3-4f78-b66d-ffba6001db43" id="sec.728B-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The chief inspector may extend the term of the interim authority to a term that ends no more than 1 year after the end of its term as stated in the authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ce769ac0-f362-4cc4-8a3d-a382bfd6d444" id="sec.728B-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">However, the chief inspector may extend the term more than once only if satisfied exceptional circumstances justify the further extension.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e9eea67d-4809-4aed-9522-e5d77d5d83fd" id="sec.728B-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">If, within the term of the interim authority, the chief inspector considers the applicant has adequately demonstrated that the applicant has the competencies and experience to hold the gas work licence or authorisation applied for, the chief inspector must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cde2480b-1fc5-4a0c-bc31-78c9c133b6f3" id="sec.728B-ssec.7-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">grant the application; and</txt></block></li><li guid="_68253da7-7a0e-420d-9ba8-09519a4e908f" id="sec.728B-ssec.7-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">cancel the interim authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ebb81b17-1e12-485a-80dd-44b8be900559" id="sec.728B-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">Otherwise, the chief inspector must refuse the application at the end of the term of the interim authority.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_05bf9e4c-918d-4298-98c3-faae6e1b0dce" id="sec.728C" provision.type="other" spent.amends="0"><no>728C</no><heading guid="_a5ed774f-7e73-4b2e-9e19-e9cdea77525c" id="sec.728C-he">Deciding application</heading><subclause affected.by.uncommenced="0" guid="_856df86c-f24c-4a22-b3b2-488061d247ca" id="sec.728C-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.728B" target.guid="_e9c839db-d0c7-4cee-8ae4-95159d1e06ee">section 728B</intref>, the chief inspector must decide whether to grant or refuse the application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_439780d0-dab6-44a3-84d1-c352e17719ef" id="sec.728C-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the chief inspector must refuse the application if the applicant—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9326763d-ad40-4658-93f9-de171dcf0046" id="sec.728C-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">does not have the qualifications or experience prescribed under a regulation for the type of gas work licence or authorisation applied for; or</txt></block></li><li guid="_5d3c999b-b853-4718-a2f9-99ed8feb81e0" id="sec.728C-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is not a suitable person to hold the gas work licence or authorisation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9802a668-ad10-49a4-b90e-a7e365be311f" id="sec.728C-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the chief inspector decides to grant the application, the chief inspector may—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_240b6cc3-1fde-4cfe-954d-12de81457d40" id="sec.728C-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">limit the gas work licence or authorisation to a stated type of gas work; or</txt></block></li><li guid="_3299289e-23ab-45a0-a450-24e39aa4a6cd" id="sec.728C-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">impose conditions on the gas work licence or authorisation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_37019f99-1143-4c88-99fc-8ee0fcfa8eef" id="sec.728C-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the chief inspector makes a decision as follows, the chief inspector must give the applicant an information notice about the decision—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c5001c7f-8b1a-4edb-b206-25bcbd2dffa4" id="sec.728C-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a decision to refuse the application;</txt></block></li><li guid="_fdaceb38-f9a1-403d-8d0d-3a674d878764" id="sec.728C-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a decision to impose a condition on, or to limit, the gas work licence or authorisation, other than a condition or limitation agreed to or requested by the applicant.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_770ae6c8-5bd8-44a5-b22f-fd0322770704" id="sec.728C-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">In deciding whether the applicant is a suitable person to hold the gas work licence or authorisation, the chief inspector may have regard to the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3b1ecb31-4b1b-410e-aa89-b8160d865313" id="sec.728C-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">whether the applicant has been convicted of an indictable offence;</txt></block></li><li guid="_1f8ae864-004e-4c64-b6ab-b314da5a8255" id="sec.728C-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether the applicant has been convicted of an offence against the repealed <legref check="invalid" jurisd="QLD" type="act"><name emphasis="yes">Gas Act 1965</name></legref> or this Act;</txt></block></li><li guid="_373c9944-67e5-432b-8e08-fd1c4ae21760" id="sec.728C-ssec.6-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">any disability or medical condition the applicant has that could put the applicant or the public at risk;</txt></block></li><li guid="_b20dbe35-7954-4e95-8b1b-edc4115d6a25" id="sec.728C-ssec.6-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">any other issue relevant to the applicant’s suitability to hold the gas work licence or authorisation.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_097f1a01-095f-4888-96cd-c69dd0e5ca1d" id="sec.728D" provision.type="other" spent.amends="0"><no>728D</no><heading guid="_fe95705c-6acd-40bb-b66e-bf5adb0b73ab" id="sec.728D-he">Term of gas work licence or authorisation</heading><subclause affected.by.uncommenced="0" guid="_712f524a-a396-4357-9875-d2ff6b62b473" id="sec.728D-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A gas work licence or authorisation may be issued for a stated term.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9aad8cae-4607-484b-9324-a54274226c73" id="sec.728D-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If no term is stated, the gas work licence or authorisation continues in force unless it is cancelled, suspended or surrendered under this Act.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" change="delStruct" guid="_a8e5afae-c118-4fd1-933d-f9eea955a033-del" id="ch.9-pt.6-div.3-sdiv.2-del"><no>Subdivision 2</no><heading guid="_320a26e7-0839-4a23-a4b9-ab3992211b1a-del" id="ch.9-pt.6-div.3-sdiv.2-he-del">General provisions for gas work licences and authorisations</heading><clause affected.by.uncommenced="0" guid="_4ff3dc8d-473a-44e9-9aed-2d3c7528b4d9" id="sec.729" provision.type="other" spent.amends="0"><no>729</no><heading guid="_21671810-f320-4b04-af55-aa57d8df50f6" id="sec.729-he">Offence not to comply with conditions</heading><block><txt break.before="1">The holder of a gas work licence or authorisation must comply with its conditions.</txt></block><penalty guid="_8e6ec7bd-16c8-4a8f-9aef-9678ffe9aa89" id="sec.729-pen"><block><txt break.before="1">Maximum penalty—250 penalty units.</txt></block></penalty><note guid="_779b7aba-1578-4323-b823-d780b448e0c0" id="sec.729-note" type="example"><heading guid="_3e94b9b8-831f-4754-9dea-5419a0ad134b" id="sec.729-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></clause><clause affected.by.uncommenced="0" change="del" guid="_88cecff7-49cd-4db6-96d9-e73df7d047cf-del" id="sec.730-del" provision.type="other" spent.amends="0"><no>730</no><heading guid="_d5fe7a7f-59a6-4e36-bbea-0250ca63d09f-del" id="sec.730-he-del">Register of gas work licences and authorisations</heading><block><txt break.before="1">The chief inspector must keep a register of details about gas work licences and authorisations.</txt></block></clause><clause affected.by.uncommenced="0" change="del" guid="_cde2cbd5-6848-4887-8559-e91445984828-del" id="sec.731-del" provision.type="other" spent.amends="0"><no>731</no><heading guid="_84f6b56d-7e7d-4ff8-ae2b-af3d9f2dc215-del" id="sec.731-he-del">Access to register</heading><subclause affected.by.uncommenced="0" guid="_42792492-312e-41d6-8a97-95bba3ea4230-del" id="sec.731-ssec.1-del" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief inspector must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dedb8955-d7ed-4647-9a13-fffca195b67f-del" id="sec.731-ssec.1-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">keep the register of gas work licences and authorisations open for inspection by the public during office hours on business days at—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_de035b5d-4e68-4e20-9524-cf951f0d3e1c-del" id="sec.731-ssec.1-para1.a-para2.i-del" provision.type="other"><no>(i)</no><block><txt break.before="0">the department’s head office; and</txt></block></li><li guid="_d65fe10b-c52c-42da-b6bc-54fa8c927b4a-del" id="sec.731-ssec.1-para1.a-para2.ii-del" provision.type="other"><no>(ii)</no><block><txt break.before="0">other places the chief inspector considers appropriate; and</txt></block></li></list></block></li><li guid="_3e77d900-1f8b-4cdb-baef-547120929472-del" id="sec.731-ssec.1-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">allow a person to take extracts, free of charge, from the register; and</txt></block></li><li guid="_58a14e3c-60f4-4860-93d0-a4814cd90238-del" id="sec.731-ssec.1-para1.c-del" provision.type="other"><no>(c)</no><block><txt break.before="0">give a person who asks for a copy of all or part of a document or information held in the register the copy on payment of the fee prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_29a8aa4c-78fb-45f7-9045-d88d75910769-del" id="sec.731-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">This section does not apply to any part of the register that discloses the residential address of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_121dffd6-d422-4f05-bc01-6780e14afc9b-del" id="sec.731-ssec.2-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">a gas work licence or authorisation holder who is an individual; or</txt></block></li><li guid="_125f362a-0a85-47a1-8b7d-893e41ee7e52-del" id="sec.731-ssec.2-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">an individual authorised by a gas work authorisation holder to carry out gas work.</txt></block></li></list></block></subclause></clause></subdivision></division></part><part affected.by.uncommenced="0" change="ins" guid="_d677ba29-e82d-42d1-84e6-6bf2b24440b9" id="ch.9-pt.6A"><no>Part 6A</no><heading guid="_2a502a3b-60dd-4ec1-9379-3580d3866846" id="ch.9-pt.6A-he">Approval of gas devices</heading><division affected.by.uncommenced="0" guid="_a011bd27-3975-4649-9023-44c5d4a62707" id="ch.9-pt.6A-div.1"><no>Division 1</no><heading guid="_e24b484c-c4aa-4c86-9832-501d319230b5" id="ch.9-pt.6A-div.1-he">Approval requirement</heading><clause affected.by.uncommenced="0" guid="_7fca5c88-764d-4559-b95a-8e594e286ec3" id="sec.731AA" provision.type="other" spent.amends="0"><no>731AA </no><heading guid="_c05cc24d-5ced-456d-a74f-54b60d6b80ae" id="sec.731AA-he">Approval of gas devices for supply, installation and use</heading><subclause affected.by.uncommenced="0" guid="_d00ee385-4446-4314-bb2b-1980b39727ff" id="sec.731AA-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not supply a gas device (type A), or install or use any type of gas device, unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5e52c750-0370-44d6-b159-9c10059bae47" id="sec.731AA-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the supply, installation or use has been approved by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3652a2be-3d2a-416c-a46b-348a2ff5bcde" id="sec.731AA-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the chief inspector; or</txt></block></li><li guid="_e8ba8f72-8a46-4017-9550-b7d58c47ee7b" id="sec.731AA-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a person who holds a gas device approval authority for the gas device; and</txt></block></li></list></block></li><li guid="_e3c532e4-abb5-4a1e-a8d7-ba923f574f3b" id="sec.731AA-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the gas device complies with any labelling requirements prescribed by regulation for the device.</txt></block></li></list><penalty guid="_493a2ba5-cc12-42d8-9039-680d3186555d" id="sec.731AA-ssec.1-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></block><note guid="_a9d97b8c-1c2e-4a0a-8310-b5ae7e91b1e6" id="sec.731AA-ssec.1-note" type="example"><heading guid="_4e9f23f7-25ac-4017-8e02-b9ecd9059afa" id="sec.731AA-ssec.1-note-he">Note—</heading><block><txt break.before="1">This provision is an executive liability provision—see section 814.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_fff3741c-54e1-4404-906b-5084abf40228" id="sec.731AA-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Also, a person must not supply a gas device unless the person gives the person to whom the device is supplied a written notice in the approved form stating that the installation and use of the device must be approved under subsection (1)(a).</txt></block><penalty guid="_3b53e1fc-dfc8-4514-b8f7-88da3d412d71" id="sec.731AA-ssec.2-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty><note guid="_0ed33ea4-4e0c-488c-b50a-9a84804a6f34" id="sec.731AA-ssec.2-note" type="example"><heading guid="_1d3d2e2f-e0c8-47fa-a6fb-0fa5a2ad6057" id="sec.731AA-ssec.2-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under section 814A, to have also committed the offence.</txt></block></note></subclause></clause></division><division affected.by.uncommenced="0" guid="_67606225-3428-4ee1-9790-6d6553e6f434" id="ch.9-pt.6A-div.2"><no>Division 2</no><heading guid="_5424e8eb-8589-4a09-8321-506f0fa8c308" id="ch.9-pt.6A-div.2-he">Gas device approval authorities</heading><clause affected.by.uncommenced="0" guid="_e8ae621b-9d4c-45d6-b6aa-e193a306095c" id="sec.731AB" provision.type="other" spent.amends="0"><no>731AB </no><heading guid="_f0036814-3c94-4c52-bf29-14c5af972887" id="sec.731AB-he">Who may apply</heading><block><txt break.before="0">A person may apply to the chief inspector for a gas device approval authority for a gas device.</txt></block></clause><clause affected.by.uncommenced="0" guid="_eedada16-987d-4434-b387-e1e3f0119d4d" id="sec.731AC" provision.type="other" spent.amends="0"><no>731AC </no><heading guid="_87eee3f3-a534-49d7-94d1-c709b662c004" id="sec.731AC-he">Requirements for application</heading><block><txt break.before="0">The application must be in the approved form and comply with any requirement prescribed by regulation.</txt></block></clause><clause affected.by.uncommenced="0" guid="_63e2f7bf-13ac-45d4-802a-887ee24146fa" id="sec.731AD" provision.type="other" spent.amends="0"><no>731AD </no><heading guid="_72efed50-117a-47ab-8b2a-2184425b332d" id="sec.731AD-he">Deciding application</heading><subclause affected.by.uncommenced="0" guid="_35a3318c-b4fc-480a-8dbe-a1039f69e421" id="sec.731AD-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief inspector must decide whether to grant or refuse the application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a56a1b97-88d9-4b72-812f-87efc81fbd70" id="sec.731AD-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the chief inspector must refuse the application if the chief inspector considers the applicant—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_543b1934-7e6a-47ec-80e2-68bb31129fe5" id="sec.731AD-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">does not have the qualifications or experience for approving a gas device prescribed by regulation; or</txt></block></li><li guid="_fb7a4059-4024-4cf4-9b88-32527ebabb93" id="sec.731AD-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is not a suitable person to hold the authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_746f2e45-e3b4-4611-95be-a6b18445e160" id="sec.731AD-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In deciding whether the applicant is a suitable person to hold the authority, the chief inspector may have regard to the following matters—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e919c576-dd4e-42fa-a3c4-bd04b8dba151" id="sec.731AD-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">any noncompliance action taken against the applicant;</txt></block></li><li guid="_278ebc72-8023-4265-8e84-1e0f6bd553f0" id="sec.731AD-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether the applicant has been convicted of an indictable offence or an offence against this Act;</txt></block></li><li guid="_b6b2be37-c98e-4f02-b397-a83e91c43a03" id="sec.731AD-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">any other matter prescribed by regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1b5505b3-baf1-424b-a182-a804f904b2d1" id="sec.731AD-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief inspector may impose a condition on the authority when making a decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_896073b5-08e9-4918-88d3-33c32796de53" id="sec.731AD-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the chief inspector makes any of the following decisions, the chief inspector must give the applicant an information notice about the decision—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5d838ecd-dea2-4bca-9591-805c4946aaf9" id="sec.731AD-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a decision to refuse the application;</txt></block></li><li guid="_30bb5edd-ad1e-44c1-8966-1da517d85146" id="sec.731AD-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a decision to impose a condition on the authority, other than a condition agreed to or requested by the applicant.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_75caf440-717b-4e19-92a2-d3c2678e4d4e" id="sec.731AE" provision.type="other" spent.amends="0"><no>731AE </no><heading guid="_cfb4f906-0371-46eb-8540-9e157cecc9a8" id="sec.731AE-he">Term of gas device approval authority</heading><subclause affected.by.uncommenced="0" guid="_399a8e38-1ec4-4af0-aff8-95ec0f31ddd9" id="sec.731AE-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A gas device approval authority takes effect—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_19fa7946-41e7-47a4-a415-f172dad384b4" id="sec.731AE-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">on a day stated in it; or</txt></block></li><li guid="_74ca6757-054e-440f-87f7-8ee71816686e" id="sec.731AE-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if no day of effect is stated, on the day it is granted.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e1009b88-5878-49be-a510-416b6e038d4a" id="sec.731AE-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The authority may be issued for a stated term and remains in force until the end of the term unless it is cancelled, suspended or surrendered under this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0f6330d1-d6da-4e6c-b790-bef91fc439bf" id="sec.731AE-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If no term is stated, the authority continues in force unless it is cancelled, suspended or surrendered under this Act.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f72705e4-01f4-435d-9dba-15d56b031b33" id="sec.731AF" provision.type="other" spent.amends="0"><no>731AF </no><heading guid="_8406cd87-1ad1-4eda-9083-4f9b74ba88fb" id="sec.731AF-he">Conditions for gas device approval authority</heading><block><txt break.before="0">A regulation may prescribe—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_90da899d-f49c-4004-9755-bc4644374e1c" id="sec.731AF-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a condition of a gas device approval authority that applies in addition to a condition imposed under section 731AD; and</txt></block></li><li guid="_537666d1-dd2c-447c-a357-0f3efd2c2a5a" id="sec.731AF-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a requirement the chief inspector must comply with to vary or revoke a condition imposed under section 731AD.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_0e85ddf7-e8b2-4b2e-9d1a-6c816812303c" id="sec.731AG" provision.type="other" spent.amends="0"><no>731AG </no><heading guid="_cced48e4-8ed7-4388-b42f-68f6b689295c" id="sec.731AG-he">Offence not to comply with conditions</heading><block><txt break.before="1">The holder of a gas device approval authority must comply with the conditions of the authority.</txt><penalty guid="_4c65e4ff-41aa-4940-b05e-c0c33b32c18b" id="sec.731AG-pen"><block><txt break.before="1">Maximum penalty—250 penalty units.</txt></block></penalty><note guid="_a5dc0155-547d-4408-8ba5-21716771eef9" id="sec.731AG-note" type="example"><heading guid="_6ad7f28f-0a77-4e0b-ade3-fd9d6382731b" id="sec.731AG-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under section 814A, to have also committed the offence.</txt></block></note></block></clause></division></part><part affected.by.uncommenced="0" guid="_d7b4ed9b-6c21-4603-bd91-9267c25c70f6" id="ch.9-pt.7"><no>Part 7</no><heading guid="_f274600e-b9c0-41b1-b4ff-a2cc4a4f8545" id="ch.9-pt.7-he">Miscellaneous provisions</heading><clause affected.by.uncommenced="0" guid="_fc7321b4-36c5-4ff9-864b-a1a233804d57" id="sec.731A" provision.type="other" spent.amends="0"><no>731A</no><heading guid="_ded1dd0f-7788-4def-87a7-77ddae8bf690" id="sec.731A-he">Person may owe obligations in more than 1 capacity</heading><block><txt break.before="1">A person on whom an obligation is imposed under this Act may be subject to more than 1 safety and health obligation.</txt></block></clause><clause affected.by.uncommenced="0" guid="_6738a577-4eab-4b6c-98e4-176d0361cfce" id="sec.731B" provision.type="other" spent.amends="0"><no>731B</no><heading guid="_25d9b3c2-4fdd-4dd7-8cca-acc1aaa00139" id="sec.731B-he">Person not relieved of obligations</heading><block><txt break.before="1">To remove doubt, it is declared that nothing in this Act that imposes an obligation on a person relieves another person of the person’s obligations under this Act.</txt></block></clause><clause affected.by.uncommenced="0" guid="_b9c2121f-d0e6-4165-a55b-9636c95ce008" id="sec.732" provision.type="other" spent.amends="0"><no>732</no><heading guid="_10ce48f8-ddbf-4573-9cc7-0428f102d0fd" id="sec.732-he">Increase in maximum penalties in circumstances of aggravation</heading><subclause affected.by.uncommenced="0" guid="_c7f4cabb-ad5c-454c-adf2-f5a61209e46b" id="sec.732-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section provides for the maximum penalty for an offence against a provision of this chapter if the act or omission that constitutes the offence caused a circumstance stated in <intref check="valid" refid="sec.732-ssec.3" target.guid="_c7cef99c-037f-4fd0-8844-0881f2be6d13">subsection (3)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b978d665-35c0-4080-9705-5aac5b2b3df7" id="sec.732-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If a circumstance stated in <intref check="valid" refid="sec.732-ssec.3" target.guid="_c7cef99c-037f-4fd0-8844-0881f2be6d13">subsection (3)</intref> has happened, the maximum penalty stated in the subsection applies instead of the maximum penalty stated in another provision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c7cef99c-037f-4fd0-8844-0881f2be6d13" id="sec.732-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For this section, the circumstances and maximum penalties are—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_23b6a272-2839-46df-a60c-34d795d217dd" id="sec.732-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for the death of, or grievous bodily harm to, more than 1 person—5,000 penalty units or 3 years imprisonment; or</txt></block></li><li guid="_d22fa3b2-d3bc-4f31-9fd7-d88fc049e0ac" id="sec.732-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for the death of, or grievous bodily harm to, only 1 person—3,000 penalty units or 2 years imprisonment; or</txt></block></li><li guid="_bf7bac5b-1d73-4b80-8a0a-a959a25fb47d" id="sec.732-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">for the exposure of anyone to a substance likely to cause death or grievous bodily harm—1,000 penalty units or 1 year’s imprisonment; or</txt></block></li><li guid="_1ca422d8-2626-4060-ad77-0f16b5ec0a01" id="sec.732-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">for bodily harm—1,000 penalty units or 1 year’s imprisonment; or</txt></block></li><li guid="_56845fac-6d04-4f57-bee5-28dfe10ff67e" id="sec.732-ssec.3-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">for serious property damage—1,000 penalty units or 6 months imprisonment.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d6c73dae-e8cc-4f69-ae7e-36886ae2c6d3" id="sec.732A" provision.type="other" spent.amends="0"><no>732A</no><heading guid="_42d3a151-42ed-4fb2-9735-3f60b27dd8db" id="sec.732A-he">Defences for certain offences</heading><subclause affected.by.uncommenced="0" guid="_39cae181-5b4a-47a3-bc54-f6762f68c6cd" id="sec.732A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section provides defences in a proceeding against a person for a contravention of <intref check="valid" refid="sec.677" target.guid="_b1e0e6bc-df7e-40d5-80db-d12a53fbdaf1">section 677</intref>, <intref check="valid" refid="sec.688" target.guid="_866b286e-5641-4e33-b039-3f312ccb9208">688</intref>, <intref check="valid" refid="sec.693" target.guid="_9a52fa7d-c2e2-4677-823c-f9555f270472">693</intref>, <intref check="valid" refid="sec.699" target.guid="_da62968d-8e0b-4b13-a140-d092e9f1f16e">699</intref>, <intref check="valid" refid="sec.702" target.guid="_d93bd1bd-797a-4a8e-8834-12549e2a37b5">702</intref>, <intref check="valid" refid="sec.703" target.guid="_14704f70-c3b4-4604-8baf-1e2e550cbf21">703</intref> or <intref check="valid" refid="sec.704" target.guid="_611724b2-2902-492f-bad5-5c6bdf369114">704</intref> (the <defterm guid="_4d4cdfaf-d4ec-4b0f-a24b-906334f335b7" id="sec.732A-def.relevantsections" type="definition">relevant sections</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_24baab60-454a-41ad-9ac1-8a8a9f8c1135" id="sec.732A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">To the extent the contravention is a contravention of a particular safety requirement, it is a defence in the proceedings to prove—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3007587b-1fff-4cd4-9d21-b4a0806f952c" id="sec.732A-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if a regulation was made about the way to ensure the safety requirement was to be met—the person followed the way prescribed in the regulation to ensure the safety requirement was met; or</txt></block></li><li guid="_940bd326-2c3a-423a-a29a-a3f733d618bc" id="sec.732A-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">subject to <intref check="valid" refid="sec.732A-ssec.2-para1.a" target.guid="_3007587b-1fff-4cd4-9d21-b4a0806f952c">paragraph (a)</intref>, if a recognised standard was made stating a way or ways to ensure the safety requirement was to be met—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f6ccb4e4-b79f-4264-9288-95281ef30246" id="sec.732A-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">that the person adopted and followed a stated way to ensure the safety requirement was met; or</txt></block></li><li guid="_cc522259-3016-41b8-8d01-c3826d002037" id="sec.732A-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">that the person adopted and followed another way that ensured the safety requirement was met that was equal to or better than the stated way for ensuring the safety requirement was met; or</txt></block></li></list></block></li><li guid="_fdc029a6-11e5-4243-856e-97087bd6cf54" id="sec.732A-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if no regulation or recognised standard prescribes or states a way to discharge the person’s obligation in relation to the safety requirement—that the person took reasonable precautions and exercised proper diligence to ensure the safety requirement was met.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_438bb643-d874-40f3-9106-e09120464980" id="sec.732A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, it is a defence in a proceeding against a person for an offence against the relevant sections for the person to prove that the contravention was due to causes over which the person had no control.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_cfdcfc8c-11c5-404e-8648-e6811bcf01bb" id="sec.732A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The <legref check="valid" jurisd="QLD" target.doc.id="act-1899-009" target.version.series="19dc3aee-7313-4ba8-a7f6-7abf0c19b425" type="act"><name emphasis="no">Criminal Code</name></legref>, <legref check="valid" jurisd="QLD" refid="sch.1-sec.23" target.doc.id="act-1899-009" target.guid="_13b2bb40-c2c8-47a0-a36d-c0a22e9aa68e" target.version.series="19dc3aee-7313-4ba8-a7f6-7abf0c19b425" type="act">sections 23</legref><legref check="invalid" jurisd="QLD" type="act">(1)</legref> and <legref check="valid" jurisd="QLD" refid="sch.1-sec.24" target.doc.id="act-1899-009" target.guid="_37730928-698e-40b0-bd91-fa76ffb45fe9" target.version.series="19dc3aee-7313-4ba8-a7f6-7abf0c19b425" type="act">24</legref> do not apply in relation to a contravention of <intref check="valid" refid="sec.677" target.guid="_b1e0e6bc-df7e-40d5-80db-d12a53fbdaf1">section 677</intref>, <intref check="valid" refid="sec.688" target.guid="_866b286e-5641-4e33-b039-3f312ccb9208">688</intref>, <intref check="valid" refid="sec.693" target.guid="_9a52fa7d-c2e2-4677-823c-f9555f270472">693</intref>, <intref check="valid" refid="sec.699" target.guid="_da62968d-8e0b-4b13-a140-d092e9f1f16e">699</intref>, <intref check="valid" refid="sec.702" target.guid="_d93bd1bd-797a-4a8e-8834-12549e2a37b5">702</intref>, <intref check="valid" refid="sec.703" target.guid="_14704f70-c3b4-4604-8baf-1e2e550cbf21">703</intref> or <intref check="valid" refid="sec.704" target.guid="_611724b2-2902-492f-bad5-5c6bdf369114">704</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5d22b6d3-9646-45a5-aa05-b8400b9dcbdf" id="sec.732A-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_05ed0929-6520-4935-911e-de6eb19bc3a4" id="sec.732A-ssec.5-def.recognisedstandard_"><txt break.before="1"><defterm guid="_7d1292a5-0a3e-432f-a487-2cacfc77d449" id="sec.732A-ssec.5-def.recognisedstandard" type="definition">recognised standard</defterm> means a recognised standard in force at the time of the contravention.</txt></definition><definition affected.by.uncommenced="0" guid="_9fbb5e05-fea0-4767-990b-193c99912c7b" id="sec.732A-ssec.5-def.safetyrequirement_"><txt break.before="1"><defterm guid="_07023284-b267-4027-82f5-47bdf63de773" id="sec.732A-ssec.5-def.safetyrequirement" type="definition">safety requirement</defterm> means a requirement—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_85eb334b-272f-4449-970d-6a3f68632b16" id="sec.732A-ssec.5-def.safetyrequirement-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a person must comply with to ensure the safety of another person; or</txt></block></li><li guid="_52e2b260-c240-4fb2-92b1-b90da3ffb4ee" id="sec.732A-ssec.5-def.safetyrequirement-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that a person must not do an act or make an omission that affects the safety of another person.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_312a8b5e-b738-407b-921c-a331a7f3850d" id="sec.732B" provision.type="other" spent.amends="0"><no>732B</no><heading guid="_e7247946-71a2-4fb1-8483-5eea1dfc516f" id="sec.732B-he">Technical advisory committees</heading><subclause affected.by.uncommenced="0" guid="_82316c1d-cdaa-4fd0-bbf0-1e6ec21576ee" id="sec.732B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief inspector may establish technical advisory committees to consider matters relating to safety, quality, and measurement.</txt><note guid="_fea2b363-2559-40ca-8a4a-a884223c5d1b" id="sec.732B-ssec.1-note" type="example"><heading guid="_6603e856-b13e-4cc6-85e1-d74295623d96" id="sec.732B-ssec.1-note-he">Examples of matters for <intref check="valid" refid="sec.732B-ssec.1" target.guid="_82316c1d-cdaa-4fd0-bbf0-1e6ec21576ee">subsection (1)</intref>—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_096aa3cd-7703-4292-bf24-c7c4ccf57c76" id="sec.732B-ssec.1-note-para1" provision.type="other"><no>•</no><block><txt break.before="0">proposed regulation exemptions from requirements relating to coal seam gas</txt></block></li><li guid="_b9a925de-c954-4e8c-a75c-9cb19e7a468b" id="sec.732B-ssec.1-note-para1-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">reviewing safety requirements</txt></block></li><li guid="_fee617ac-53d0-4bdb-b9ac-691dea93c669" id="sec.732B-ssec.1-note-para1-oc.3" provision.type="other"><no>•</no><block><txt break.before="0">developing relevant protocols or standards</txt></block></li></list></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_8efb1839-b057-4803-ab91-41352ad1d9e3" id="sec.732B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief inspector may decide the following for a technical advisory committee—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e8b0d15d-eac2-4c95-b530-dba3c8286825" id="sec.732B-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">its functions or terms of reference;</txt></block></li><li guid="_fb5ea2aa-4ca4-420d-a034-092fa70c455f" id="sec.732B-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">its membership;</txt></block></li><li guid="_6f72e38a-3019-4ace-820a-d61c1546065e" id="sec.732B-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">who is to be its chairperson.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2d1cc6d8-d990-4957-bffc-3a96378410a0" id="sec.732B-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief inspector may call for nominations for a technical advisory committee from relevant stakeholder organisations.</txt></block></subclause></clause><clause affected.by.uncommenced="0" change="delReplace" guid="_f1623434-293e-4b90-bef4-22f13c5b2bf4-del" id="sec.733-del" provision.type="other" spent.amends="0"><no>733</no><heading guid="_f88e263f-fa9d-4f6b-93f4-13237245ca22-del" id="sec.733-he-del">Approval of gas devices and gas fittings for supply, installation and use</heading><subclause affected.by.uncommenced="0" guid="_302dbbae-28dc-4d16-afac-66d06d6ed204-del" id="sec.733-ssec.1-del" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not supply a gas device (type A) or a gas fitting, or install or use any type of gas device or gas fitting, unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_02919799-8c01-4bdd-a280-17e63a8e5c81-del" id="sec.733-ssec.1-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">the supply, installation or use has been approved by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_330e54c3-b3b1-4842-9804-0970a53dc897-del" id="sec.733-ssec.1-para1.a-para2.i-del" provision.type="other"><no>(i)</no><block><txt break.before="0">the chief inspector; or</txt></block></li><li guid="_08c875ea-e51a-43a0-9edd-7a81cf559be2-del" id="sec.733-ssec.1-para1.a-para2.ii-del" provision.type="other"><no>(ii)</no><block><txt break.before="0">a person or body approved by the chief inspector for the particular type of gas device or gas fitting; and</txt></block></li></list></block></li><li guid="_23dad260-ba03-47ad-b3d6-afab0b4e6f7a-del" id="sec.733-ssec.1-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">if a regulation prescribes a label for the gas device or gas fitting—the gas device or gas fitting complies with any relevant labelling requirements prescribed under the regulation.</txt></block></li></list></block><penalty guid="_9932624d-3075-42d9-866b-60e4b3a879fb-del" id="sec.733-ssec.1-pen-del"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty><note guid="_90f9e48f-c380-461d-904e-9422fd0a1c59-del" id="sec.733-ssec.1-note-del" type="example"><heading guid="_12232f47-a67d-49e9-a896-4fe36a9e597f-del" id="sec.733-ssec.1-note-he-del">Note—</heading><block><txt break.before="1">This provision is an executive liability provision—see <intref check="valid" refid="sec.814" target.guid="_9fa8e8a1-4511-4ac6-b2de-5b287f47ce16">section 814</intref>.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_23a8c18a-acb3-444f-9604-0e46be81f175-del" id="sec.733-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">Also, a person must not supply a gas device unless the person gives the person to whom the device is supplied a written notice in the approved form stating that the installation and use of the device must be approved under <intref check="valid" refid="sec.733-ssec.1" target.guid="_302dbbae-28dc-4d16-afac-66d06d6ed204">subsection (1)</intref><intref check="valid" refid="sec.733-ssec.1-para1.a" target.guid="_02919799-8c01-4bdd-a280-17e63a8e5c81">(a)</intref>.</txt></block><penalty guid="_e74152c1-2d7a-47d5-9904-23b27c10a361-del" id="sec.733-ssec.2-pen-del"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty><note guid="_544eade4-c4c7-4507-bfcf-a75aa1480485-del" id="sec.733-ssec.2-note-del" type="example"><heading guid="_9c610c58-93d1-4437-8f1b-b77c566499b6-del" id="sec.733-ssec.2-note-he-del">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_b225fe7f-7be3-4b59-a948-ad60ad5c8e9e-del" id="sec.733-ssec.3-del" provision.type="other"><no>(3)</no><block><txt break.before="0">An approval under <intref check="valid" refid="sec.733-ssec.1" target.guid="_302dbbae-28dc-4d16-afac-66d06d6ed204">subsection (1)</intref><intref check="valid" refid="sec.733-ssec.1-para1.a" target.guid="_02919799-8c01-4bdd-a280-17e63a8e5c81">(a)</intref> in relation to a gas device or gas fitting, that has been given by a person or body other than the chief inspector, ceases to have force only if the approval is cancelled or suspended by the approved person or body with the written consent of the chief inspector.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_393a3a83-688a-4f3c-b5ff-dc8b2903cc96" id="sec.733A" provision.type="other" spent.amends="0"><no>733A</no><heading guid="_8a453ec5-7e82-4ad2-95bb-a0b244d82d4f" id="sec.733A-he">False or misleading labels or records</heading><block><txt break.before="1">A person must not attach or cause to be attached a label or other record to a gas device or gas fitting if the label or record is false or misleading in a material particular.</txt><note guid="_96612565-62f2-4b72-a219-fddba969bc27" id="sec.733A-note" type="example"><heading guid="_80940448-daff-46e4-97ad-862e68c72e0e" id="sec.733A-note-he">Example of other record—</heading><block><txt break.before="1">a compliance plate</txt></block></note></block><penalty guid="_736c3bc6-9464-41bd-b3a7-d0157648a928" id="sec.733A-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty><note guid="_e5b8ab3e-3d12-4e83-8f65-96a4bc1ad9fb" id="sec.733A-note-oc.2" type="example"><heading guid="_2fed570e-00b1-491c-94ac-a829b8ee8959" id="sec.733A-note-oc.2-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></clause><clause affected.by.uncommenced="0" guid="_03eaca55-5625-4b02-8f0c-4acea364ae57" id="sec.734" provision.type="other" spent.amends="0"><no>734</no><heading guid="_c836f035-c2e2-4cc5-8287-73eb0c092bb3" id="sec.734-he">Requirements for gas system installation</heading><subclause affected.by.uncommenced="0" guid="_8d5fdb08-58f0-41ec-9172-4f49a62b39cd" id="sec.734-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a safety requirement applies to a type of gas system, a person must not install a system of that type unless the installation complies with the safety requirement.</txt></block><penalty guid="_8e1f9e55-27c0-44a5-98b4-ceaffc497afd" id="sec.734-ssec.1-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty><note guid="_e99a4a64-b561-4b52-8de8-6ccdb3eb8db7" id="sec.734-ssec.1-note" type="example"><heading guid="_64759011-d4c5-4cbf-98d0-83dd48c425d7" id="sec.734-ssec.1-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_523d89d3-fa51-4def-988a-cbcc4af5f2fe" id="sec.734-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If a person installs all or part of a gas system, the person must, within the period or at the stage of installation prescribed under a regulation—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0e5fbd38-4a5b-4122-9bbb-6b76753faab3" id="sec.734-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">give, to the person prescribed under a regulation, a certificate in the approved form about the installation and the gas system; and</txt></block></li><li guid="_3b1dbd6e-fdaf-49ae-9730-91f0b241d842" id="sec.734-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if a regulation prescribes a compliance plate for the installation—the compliance plate is attached in the way prescribed under the regulation.</txt></block></li></list></block><penalty guid="_6f5a991b-7b8d-41b9-b9ea-41dd73ece94b" id="sec.734-ssec.3-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty><note guid="_6ba95f3c-09e8-470b-a2f2-848c40fb7f30" id="sec.734-ssec.3-note" type="example"><heading guid="_e8d91e62-b486-41ef-826e-0793618854e7" id="sec.734-ssec.3-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_11c36f91-8fbe-465d-9cbe-0289c2b63d4e" id="sec.734-ssec.3-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">See also <intref check="valid" refid="ch.9-pt.6" target.guid="_d6052195-5e83-4b3d-b73c-2e57547f2071">part 6</intref>, <intref check="valid" refid="ch.9-pt.6-div.2" target.guid="_f02cfcbc-ec6e-43c2-bead-3d8db2f1c692">division 2</intref> (Restrictions).</txt></block></li><li guid="_e77fab86-2c32-418f-8e8b-ab1c95d569da" id="sec.734-ssec.3-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></li></list></block></note></subclause></clause><clause affected.by.uncommenced="0" guid="_e4cf602e-ed44-465e-9b33-43e3e6a94b03" id="sec.734A" provision.type="other" spent.amends="0"><no>734A</no><heading guid="_fc2cb79e-2efa-4d77-af90-c9f9e513957f" id="sec.734A-he">Safety obligations of gas system installer</heading><subclause affected.by.uncommenced="0" guid="_10f5d370-dbb1-4e6d-b195-ed8fc782f016" id="sec.734A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_abe729b9-3b1c-4088-83b2-a0651f214367" id="sec.734A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a person installs all or part of, or carries out gas work relating to, a gas system; and</txt></block></li><li guid="_fd8dbd9e-b138-4e57-a036-6ffed5c49134" id="sec.734A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the person has a safety concern relating to the gas system.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1ff63e66-f1f2-40e0-b941-bb16a60e9dee" id="sec.734A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.734A-ssec.1" target.guid="_10f5d370-dbb1-4e6d-b195-ed8fc782f016">subsection (1)</intref>, the person has a <defterm guid="_cbfe3f30-5df5-4ede-9a28-31956153f9d6" id="sec.734A-def.safetyconcern" type="definition">safety concern</defterm> relating to the gas system if the person knows or suspects, or ought reasonably to know or suspect that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dd9b5f84-0318-40ab-9673-7f14dd02d67c" id="sec.734A-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the gas system does not or may not comply with all relevant safety requirements; or</txt></block></li><li guid="_55a009e7-34be-4d18-a69c-a12394dc1b00" id="sec.734A-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an imminent risk of material harm to persons or property is likely if action is not taken to avoid, eliminate or minimise the risk.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0c711976-b9eb-4ae8-9c55-88130a113c3f" id="sec.734A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The person must give the owner, operator or proposed operator of the gas system notice of the noncompliance or risk, in the approved form.</txt></block><penalty guid="_164dfccf-88e3-48df-a39e-a7855d977b65" id="sec.734A-ssec.3-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_6df11b1c-cdfd-40cf-b430-53d48ffe9b7d" id="sec.734A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0"><intref check="valid" refid="sec.734A-ssec.5" target.guid="_0a81e29d-e169-4336-9a26-ac3097726bc4">Subsections (5)</intref> and <intref check="valid" refid="sec.734A-ssec.6" target.guid="_e29436b2-31b3-42de-97a1-10cca6861101">(6)</intref> apply if the safety concern relates to a risk mentioned in <intref check="valid" refid="sec.734A-ssec.2" target.guid="_1ff63e66-f1f2-40e0-b941-bb16a60e9dee">subsection (2)</intref><intref check="valid" refid="sec.734A-ssec.2-para1.b" target.guid="_55a009e7-34be-4d18-a69c-a12394dc1b00">(b)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0a81e29d-e169-4336-9a26-ac3097726bc4" id="sec.734A-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The person must take appropriate measures to avoid, eliminate or minimise the risk.</txt></block><penalty guid="_5de32fb5-e943-4499-8ee8-0439b0e2297a" id="sec.734A-ssec.5-pen"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty><note guid="_4be394dd-f1a2-4705-ba5c-943b074a8bea" id="sec.734A-ssec.5-note" type="example"><heading guid="_a6bbe03e-1e62-4e04-8f52-0a13cc8cd026" id="sec.734A-ssec.5-note-he">Example of an appropriate measure—</heading><block><txt break.before="1">The risk is fuel gas leaking from a gas device that forms part of the gas system. An appropriate measure is to isolate fuel gas supply to the device.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_e29436b2-31b3-42de-97a1-10cca6861101" id="sec.734A-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The person must, by telephone, immediately report details of the following to an inspector and the operator of the distribution system or <del xml:space="preserve">LPG</del><ins xml:space="preserve">fuel gas</ins> delivery network that supplies fuel gas to the gas system—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_da9e9c2f-3473-404e-8886-566a3b4fd15a" id="sec.734A-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the risk;</txt></block></li><li guid="_6f91b9ca-659f-41bb-9cae-17595aa1994e" id="sec.734A-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the measures taken under <intref check="valid" refid="sec.734A-ssec.5" target.guid="_0a81e29d-e169-4336-9a26-ac3097726bc4">subsection (5)</intref>.</txt></block></li></list></block><penalty guid="_5232104a-6414-4b56-bddc-8b8615f00ffa" id="sec.734A-ssec.6-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_793b11e7-406b-4206-8274-5a93d2a4e23a" id="sec.734A-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_23ef171d-5a8a-453f-a1c0-bbf8880a955d" id="sec.734A-ssec.7-def.operator_"><txt break.before="1"><defterm guid="_43a103de-9d8a-441f-8129-11ec088e2269" id="sec.734A-ssec.7-def.operator" type="definition">operator</defterm>, of a distribution system or <del xml:space="preserve">LPG</del><ins xml:space="preserve">fuel gas</ins> delivery network, means the person responsible for the management and safe operation of the system or network.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_ef508ccd-2196-4212-b855-ca62276d86bd" id="sec.734AA" provision.type="other" spent.amends="0"><no>734AA </no><heading guid="_efa018f6-3497-40b2-98da-17579bd61282" id="sec.734AA-he">Safe use of gas devices</heading><subclause affected.by.uncommenced="0" guid="_69c497c0-15da-403e-aff7-c56e24a2bf3d" id="sec.734AA-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person who uses a gas device must take reasonable steps to ensure the gas device is used safely.</txt></block><penalty guid="_b8c6e93f-60fd-4cb1-a251-43383899c7e7" id="sec.734AA-ssec.1-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_2fe488aa-bd90-4a81-8bf1-d63ff50dc34e" id="sec.734AA-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A person does not contravene subsection (1) if the person uses a gas device in accordance with—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_16190930-22b5-4ce4-b583-8b355a57b84d" id="sec.734AA-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the gas device is a gas device (type A)—the manufacturer’s instructions for the safe use of the gas device; or</txt></block></li><li guid="_1db59b59-485d-4ba3-a164-6e508f090e82" id="sec.734AA-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the gas device is a gas device (type B)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_25ec5446-e4d5-4afc-ac49-bd6fed246d6d" id="sec.734AA-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">an approval for use of the gas device under section 731AA(1)(a); and</txt></block></li><li guid="_3c36dddf-cb4b-4af7-8afd-62fa4f97b8e8" id="sec.734AA-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the manufacturer’s instructions for the safe use of the gas device.</txt></block></li></list></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_c8567703-65ad-4a41-9071-2c81c45dd260" id="sec.734AB" provision.type="other" spent.amends="0"><no>734AB</no><heading guid="_ed36078c-3717-4404-ba12-81e3b8b24203" id="sec.734AB-he">Register</heading><block><txt break.before="1">The chief inspector must keep a register of details about gas work licences, gas work authorisations and gas device approval authorities.</txt></block></clause><clause affected.by.uncommenced="0" change="ins" guid="_cde2cbd5-6848-4887-8559-e91445984828" id="sec.734AC" provision.type="other" spent.amends="0"><no>734AC</no><heading guid="_84f6b56d-7e7d-4ff8-ae2b-af3d9f2dc215" id="sec.734AC-he">Access to register</heading><subclause affected.by.uncommenced="0" guid="_42792492-312e-41d6-8a97-95bba3ea4230" id="sec.734AC-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief inspector must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dedb8955-d7ed-4647-9a13-fffca195b67f" id="sec.734AC-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">keep the register under section 734AB open for inspection by the public during office hours on business days at—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_de035b5d-4e68-4e20-9524-cf951f0d3e1c" id="sec.734AC-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">RSHQ’s head office; and</txt></block></li><li guid="_d65fe10b-c52c-42da-b6bc-54fa8c927b4a" id="sec.734AC-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">other places the chief inspector considers appropriate; and</txt></block></li></list></block></li><li guid="_3e77d900-1f8b-4cdb-baef-547120929472" id="sec.734AC-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">allow a person to take extracts, free of charge, from the register; and</txt></block></li><li guid="_58a14e3c-60f4-4860-93d0-a4814cd90238" id="sec.734AC-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">give a person who asks for a copy of all or part of a document or information held in the register the copy on payment of the fee prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_29a8aa4c-78fb-45f7-9045-d88d75910769" id="sec.734AC-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">This section does not apply to any part of the register that discloses the residential address of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_98ef7cf4-1b25-4b33-b9e3-51801d5c0e8c" id="sec.734AC-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an individual who is a holder of a gas work licence, gas work authorisation or gas device approval authority; or</txt></block></li><li guid="_125f362a-0a85-47a1-8b7d-893e41ee7e52" id="sec.734AC-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an individual authorised by a gas work authorisation holder to carry out gas work.</txt></block></li></list></block></subclause></clause></part></chapter><chapter affected.by.uncommenced="0" guid="_c24d1b74-938d-44f7-b0f2-d23cd9205275" id="ch.10"><no>Chapter 10</no><heading guid="_9dc0de11-f14c-4eb0-b4da-d10f4fd2657f" id="ch.10-he"><del xml:space="preserve">Conferences, investigations</del><ins xml:space="preserve">Investigations</ins> and enforcement</heading><part affected.by.uncommenced="0" change="delReplace" guid="_4b420ef3-c40c-49f1-abe5-a4aeccaee0a4-del" id="ch.10-pt.1AA-del"><no>Part 1AA</no><heading guid="_9fb0a05c-1307-418e-acaa-6f6a1e68d75d-del" id="ch.10-pt.1AA-he-del">Conferences with eligible claimants or owners and occupiers</heading><division affected.by.uncommenced="0" guid="_2c72afe7-ccf6-4417-8fc9-ffd5e7273abb-del" id="ch.10-pt.1AA-div.1-del"><no>Division 1</no><heading guid="_68af19de-5a40-4ea1-8c36-8a13a1b1edf2-del" id="ch.10-pt.1AA-div.1-he-del">Preliminary</heading><clause affected.by.uncommenced="0" guid="_da4ddd32-5ed5-4ba3-aa1f-fa2dcf155343-del" id="sec.734B-del" provision.type="other" spent.amends="0"><no>734B</no><heading guid="_e3a6c52e-0564-480b-92f6-352615ff9894-del" id="sec.734B-he-del">Application of <intref check="valid" refid="ch.10-pt.1AA" target.guid="_4b420ef3-c40c-49f1-abe5-a4aeccaee0a4">pt 1AA</intref></heading><subclause affected.by.uncommenced="0" guid="_e9571725-3338-4a8b-9fe1-63db349b84ba-del" id="sec.734B-ssec.1-del" provision.type="other"><no>(1)</no><block><txt break.before="0">This part applies if an authorised officer is given a conference election notice by a petroleum authority holder or an eligible claimant asking for a conference.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_715a0a58-1611-4712-9aec-b7331e84e84e-del" id="sec.734B-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">This part also applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d75cfa3f-eff7-4bf8-9883-03881e147413-del" id="sec.734B-ssec.2-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">an owner or occupier of land who is concerned about any of the following gives an authorised officer notice of the concerns—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_454fe086-0dde-42ee-a263-860ffa5e7723-del" id="sec.734B-ssec.2-para1.a-para2.i-del" provision.type="other"><no>(i)</no><block><txt break.before="0">that someone claiming to act under a petroleum authority, or to have entered land on the authority holder’s instructions—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5f978e37-52ae-4703-85aa-7ef3bffa4640-del" id="sec.734B-ssec.2-para1.a-para2.i-para3.A-del" provision.type="other"><no>(A)</no><block><txt break.before="0">is not authorised to be on the land; or</txt></block></li><li guid="_de67f8d2-0c81-485d-b301-1a760ebc557b-del" id="sec.734B-ssec.2-para1.a-para2.i-para3.B-del" provision.type="other"><no>(B)</no><block><txt break.before="0">is not complying with a provision of this Act or a condition of the petroleum authority;</txt></block></li></list></block></li><li guid="_8de2403f-b784-43a4-99e6-3489e4148fe6-del" id="sec.734B-ssec.2-para1.a-para2.ii-del" provision.type="other"><no>(ii)</no><block><txt break.before="0">activities being, or proposed to be, carried out on the land apparently under a petroleum authority (including when the activities are being, or are to be, carried out);</txt></block></li><li guid="_550cc3a7-a582-4155-9e50-809adbb79551-del" id="sec.734B-ssec.2-para1.a-para2.iii-del" provision.type="other"><no>(iii)</no><block><txt break.before="0">the conduct on the land of someone apparently acting under a petroleum authority; or</txt></block></li></list></block></li><li guid="_a95f9e6c-36eb-40ca-9522-708b138a17cc-del" id="sec.734B-ssec.2-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">a petroleum authority holder who is concerned about something relevant to the authority involving the holder and the owner or occupier of land gives an authorised officer notice of the concerns; or</txt></block></li><li guid="_3896aba2-ed97-403b-998d-4bee0678088e-del" id="sec.734B-ssec.2-para1.c-del" provision.type="other"><no>(c)</no><block><txt break.before="0">for another reason, an authorised officer considers it desirable to call a conference to discuss concerns about a petroleum authority.</txt></block></li></list></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_ec0f9dd6-9da4-497c-ba0f-910c4a785865-del" id="ch.10-pt.1AA-div.2-del"><no>Division 2</no><heading guid="_a0baea5d-49d6-49ec-aa0c-4221b9ab8b8f-del" id="ch.10-pt.1AA-div.2-he-del">Calling conference and attendance</heading><clause affected.by.uncommenced="0" guid="_c5b0c30f-0b77-49cf-b234-51c070a75b7c-del" id="sec.734C-del" provision.type="other" spent.amends="0"><no>734C</no><heading guid="_724a41ec-c925-4b97-b081-a6f54ff7a14f-del" id="sec.734C-he-del">Calling conference</heading><subclause affected.by.uncommenced="0" guid="_9e1c1bb1-cc48-4edf-9967-0a8db17e0a78-del" id="sec.734C-ssec.1-del" provision.type="other"><no>(1)</no><block><txt break.before="0">If this part applies because of the giving of a conference election notice, the authorised officer must, by notice, ask the petroleum authority holder and the eligible claimant (the <defterm guid="_ce7005ca-6163-467a-81b6-9fc3615f78bc-del" id="sec.734C-def.parties-del" type="definition">parties</defterm>) to attend a conference by the authorised officer.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7c34c6f8-71ff-454f-8448-6710c933501b-del" id="sec.734C-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">If this part applies under <intref check="valid" refid="sec.734B" target.guid="_da4ddd32-5ed5-4ba3-aa1f-fa2dcf155343">section 734B</intref><intref check="valid" refid="sec.734B-ssec.2" target.guid="_715a0a58-1611-4712-9aec-b7331e84e84e">(2)</intref>, the authorised officer may, by notice, ask the petroleum authority holder and the owner or occupier or other person with an interest in the concerns (also the <defterm guid="_acb8af0b-f93c-454f-bb7e-205c25479450-del" id="sec.734C-def.parties-oc.2-del" type="definition">parties</defterm>) to attend a conference by the authorised officer about the concerns.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bc8c7696-dbbe-4d00-bbf1-0394ceb95ae1-del" id="sec.734C-ssec.3-del" provision.type="other"><no>(3)</no><block><txt break.before="0">The notice must state when and where the conference will be held and what is to be discussed at the conference.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d8376f8a-ffef-465d-8056-450beecd0928-del" id="sec.734D-del" provision.type="other" spent.amends="0"><no>734D</no><heading guid="_4ad2b828-5185-45bb-9693-0209525d1891-del" id="sec.734D-he-del">Who may attend conference</heading><subclause affected.by.uncommenced="0" guid="_d5decb26-6364-4eb2-8435-26cd2ea5a0de-del" id="sec.734D-ssec.1-del" provision.type="other"><no>(1)</no><block><txt break.before="0">Apart from the authorised officer, anyone given notice of the conference may attend and take part in the conference.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9c25b666-26f8-489c-bf6a-8bbf5e62cc4f-del" id="sec.734D-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">Also, with the authorised officer’s approval, someone else may be present to help a person attending the conference.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_94498781-44e8-4893-b039-3e94f4bd5a86-del" id="sec.734D-ssec.3-del" provision.type="other"><no>(3)</no><block><txt break.before="0">However, a party can not be represented by a lawyer unless the parties agree and the authorised officer is satisfied there is no disadvantage to a party.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_675e9546-87e4-4d15-b5cc-5f82a04b5ff3-del" id="sec.734E-del" provision.type="other" spent.amends="0"><no>734E</no><heading guid="_ba6ad6e9-d8f0-4188-a637-377a007d2cac-del" id="sec.734E-he-del">What happens if a party does not attend</heading><subclause affected.by.uncommenced="0" guid="_a921e019-df9b-464d-b704-eaf7eb750665-del" id="sec.734E-ssec.1-del" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a party given notice of a conference under <intref check="valid" refid="sec.734C" target.guid="_c5b0c30f-0b77-49cf-b234-51c070a75b7c">section 734C</intref><intref check="valid" refid="sec.734C-ssec.2" target.guid="_7c34c6f8-71ff-454f-8448-6710c933501b">(2)</intref> does not attend.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9cbf5416-2d5c-49a6-bc38-080996d7141a-del" id="sec.734E-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">The authorised officer may hold the conference even though someone given notice of it does not attend.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6cac23ee-35b1-4d18-b9fb-2f6dff69bf87-del" id="sec.734E-ssec.3-del" provision.type="other"><no>(3)</no><block><txt break.before="0">A party who attended the conference may apply to the Land Court for an order requiring the party who did not attend to pay the attending party’s reasonable costs of attending.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_433fda33-517b-4a5f-8625-b5c1b781740b-del" id="sec.734E-ssec.4-del" provision.type="other"><no>(4)</no><block><txt break.before="0">The Land Court must not order the party who did not attend to pay costs if it is satisfied the party had a reasonable excuse for not attending.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_552759cb-ff91-4c42-b58e-d3db3ad23889-del" id="sec.734E-ssec.5-del" provision.type="other"><no>(5)</no><block><txt break.before="0">If the Land Court makes the order, it must decide the amount of the costs.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_2c8ab0cd-34bc-46a3-a014-9f2301f6b3ce-del" id="ch.10-pt.1AA-div.3-del"><no>Division 3</no><heading guid="_62760894-984a-43c5-8388-10c69a2d867d-del" id="ch.10-pt.1AA-div.3-he-del">Conduct of conference</heading><clause affected.by.uncommenced="0" guid="_aa3ca1a7-ecb8-464c-b027-6f93255c64e4-del" id="sec.734F-del" provision.type="other" spent.amends="0"><no>734F</no><heading guid="_2101fa51-fdd7-4283-8054-e609d8a16c12-del" id="sec.734F-he-del">Authorised officer’s role</heading><subclause affected.by.uncommenced="0" guid="_1afb4e42-313e-4465-8927-fdb5ebc0e477-del" id="sec.734F-ssec.1-del" provision.type="other"><no>(1)</no><block><txt break.before="0">In conducting the conference, the authorised officer must endeavour to help those attending to reach an early and inexpensive settlement of the subject of the conference.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9e47bc80-2b96-433a-a33c-30873940d669-del" id="sec.734F-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">Subject to the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.83B" target.doc.id="act-2014-047" target.guid="_770dc494-eaf6-480f-92bd-02754332329a" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">section 83B</legref>, the authorised officer is to decide how the conference is to be conducted.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_efbfa90b-2ff6-46bf-884f-8a6d312bf074-del" id="sec.734G-del" provision.type="other" spent.amends="0"><no>734G</no><heading guid="_9e035f36-8483-4d8d-843c-cff1bd0925b8-del" id="sec.734G-he-del">Statements made at conference</heading><block><txt break.before="1">Nothing said by a person at the conference is admissible in evidence in a proceeding without the person’s consent.</txt></block></clause><clause affected.by.uncommenced="0" guid="_360e4e40-e788-4425-8fb5-b5e974f8c1c8-del" id="sec.734H-del" provision.type="other" spent.amends="0"><no>734H</no><heading guid="_1464e3f9-461f-44d9-8c5c-04534a689de1-del" id="sec.734H-he-del">Agreement made at conference</heading><block><txt break.before="0">If, at the conference, the parties negotiate an agreement about the concerns the subject of the conference, the agreement must be written and signed by or for the parties.</txt></block></clause></division></part><part affected.by.uncommenced="0" guid="_68e9038f-4b55-4cd4-a87e-e72b1f4405b1" id="ch.10-pt.1"><no>Part 1</no><heading guid="_2c6873e8-9c29-4898-8feb-4900891916b4" id="ch.10-pt.1-he">Investigations</heading><division affected.by.uncommenced="0" guid="_881fa76d-98e7-40f1-a39f-aabbcb04e001" id="ch.10-pt.1-div.1"><no>Division 1</no><heading guid="_f9c1a425-5b3c-49b5-8f58-b6e02481ae53" id="ch.10-pt.1-div.1-he">Inspectors and authorised officers</heading><clause affected.by.uncommenced="0" guid="_85fe3bb6-ecd8-4e7f-a835-361ce2ca84ea" id="sec.735" provision.type="other" spent.amends="0"><no>735</no><heading guid="_dc4ee4eb-c805-4a72-985d-30f1d1e5de89" id="sec.735-he">Appointment</heading><subclause affected.by.uncommenced="0" guid="_1e696fb5-802e-4e25-aacb-7bc200f46115" id="sec.735-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The <del xml:space="preserve">chief executive</del><ins xml:space="preserve">CEO</ins> may appoint a public service officer as one of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6000cf7e-9fad-4827-9aa0-74fc05d58dc5" id="sec.735-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the chief inspector, petroleum and gas;</txt></block></li><li guid="_3fc5f854-0593-4a5f-8173-242a369fe6ed" id="sec.735-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the deputy chief inspector, petroleum and gas;</txt></block></li><li guid="_9ded26c8-8aab-44f9-9f6f-e1117da6a855" id="sec.735-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">an inspector, petroleum and gas;</txt></block></li><li guid="_a819522d-1020-40a2-905d-ff7cf5559c6e" id="sec.735-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">an authorised officer.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e25ae50d-d834-4601-af9f-19f09989d102" id="sec.735-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the <del xml:space="preserve">chief executive</del><ins xml:space="preserve">CEO</ins> may appoint a person under <intref check="valid" refid="sec.735-ssec.1" target.guid="_1e696fb5-802e-4e25-aacb-7bc200f46115">subsection (1)</intref> only if satisfied the person is qualified for appointment and has the necessary expertise or experience.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_affd5aca-0d27-4f11-8d56-1e0fe7a4342c" id="sec.736" provision.type="other" spent.amends="0"><no>736</no><heading guid="_1946e842-0f77-4d52-9150-e87ada2266ff" id="sec.736-he">Functions</heading><subclause affected.by.uncommenced="0" guid="_bc877a84-d9b3-4c34-839a-47110d8fa9e7" id="sec.736-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The functions of an inspector include each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e30c7738-6e2e-4e3a-82d8-81fa3570e3e8" id="sec.736-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">conducting audits, inspections and investigations to monitor and enforce compliance with safety management systems and—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c5954cfc-ea8f-4b74-9fd4-377bf50c94a7" id="sec.736-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the provisions of this Act relating to safety; and</txt></block></li><li guid="_54a241ed-888d-4b5b-b544-3668c2ae28f0" id="sec.736-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the provisions of the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref>; and</txt></block></li><li guid="_adae3e2a-9582-499f-9066-8109ad330c12" id="sec.736-ssec.1-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the provisions of the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref>;</txt></block></li></list></block></li><li guid="_202a0921-24b9-4bac-92b9-9e4f15949f48" id="sec.736-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">investigating incidents;</txt></block></li><li guid="_ee55d82e-7875-4b06-ab8e-bfc1325504bb" id="sec.736-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">responding to dangerous and emergency situations involving petroleum or fuel gas, a geothermal activity or GHG storage activity;</txt></block></li><li guid="_585229c9-aea5-4d85-93ea-24a5b275920c" id="sec.736-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">to provide the advice and help that may be required from time to time during emergencies at operating plants that may affect the safety or health of persons;</txt></block></li><li guid="_9b1979b3-a159-4667-aef8-847788b2f39c" id="sec.736-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">collecting information for this Act, the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref> or the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2632a04d-4952-4044-a1e9-5549a0428c65" id="sec.736-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The functions of an authorised officer include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7d265303-ce9f-4762-b078-b18069216bb4" id="sec.736-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">conducting audits, investigations and inspections to monitor and enforce compliance with provisions of this Act other than royalty provisions, provisions relating to safety, and the provisions of the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref> and the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref>; and</txt></block></li><li guid="_43c37cbe-6817-4458-8e61-c51f5bfbae56" id="sec.736-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to provide the advice and help that may be required from time to time during emergencies at operating plants that may affect the safety or health of persons; and</txt></block></li><li guid="_cf94d072-e096-4422-967f-dfde452420c5" id="sec.736-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">collecting information for this Act, the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref> and the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_63c0724d-b47c-417e-9f93-d8a59074ad30" id="sec.736-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">An inspector or authorised officer is declared to be a public official for the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-005" target.version.series="13728c9a-0e6c-41c2-8090-97af5880885b" type="act"><name emphasis="yes">Police Powers and Responsibilities Act 2000</name></legref> if the inspector or authorised officer is performing, or is proposing to perform, a function the inspector or authorised officer has under this section.</txt><note guid="_7d816196-19fe-443e-8faa-c13c019964e2" id="sec.736-ssec.3-note" type="example"><heading guid="_ed5ae0ca-f2f2-4933-a3de-5268c37e05dc" id="sec.736-ssec.3-note-he">Note—</heading><block><txt break.before="1">See the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-005" target.version.series="13728c9a-0e6c-41c2-8090-97af5880885b" type="act"><name emphasis="yes">Police Powers and Responsibilities Act 2000</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.1" target.doc.id="act-2000-005" target.guid="_e143c3f4-6e7a-463b-ab58-410bd5265ce2" target.version.series="13728c9a-0e6c-41c2-8090-97af5880885b" type="act">chapter 1</legref>, <legref check="valid" jurisd="QLD" refid="ch.1-pt.3" target.doc.id="act-2000-005" target.guid="_0e0bff60-e857-400a-8225-ab1eeb64e567" target.version.series="13728c9a-0e6c-41c2-8090-97af5880885b" type="act">part 3</legref>, <legref check="invalid" jurisd="QLD" type="act">division 2</legref> (Helping public officials).</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d2f716ba-adbb-4729-a623-4874d250c8cb" id="sec.737" provision.type="other" spent.amends="0"><no>737</no><heading guid="_a1a3484d-de28-4268-bf02-20f1d272efad" id="sec.737-he">Appointment conditions and limit on powers</heading><subclause affected.by.uncommenced="0" guid="_5b23acce-c264-490c-ab15-1ddc4f4bca7d" id="sec.737-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person who is an inspector or authorised officer holds office on any conditions stated in—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e490f9cd-c97e-41bf-a33c-9a855732ba09" id="sec.737-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the person’s instrument of appointment; or</txt></block></li><li guid="_6e2e5d64-43a5-4e94-858f-89dbd1f16b25" id="sec.737-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a signed notice given to the person.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6a363c0f-2eeb-467f-9c6f-03328ef06c4d" id="sec.737-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The instrument of appointment, a signed notice given to the person or a regulation may limit the person’s functions or powers under this Act for the office.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d5d0145b-fa31-4357-9ceb-0d23250aa1d4" id="sec.737-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">An inspector is also subject to the directions of the chief inspector in exercising the functions or powers.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b30791df-1a5f-4235-a486-c6c5cbbbc69d" id="sec.737-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_7f2bf52c-2b18-4ff4-8b4a-d0b64328b348" id="sec.737-ssec.4-def.signednotice_"><txt break.before="1"><defterm guid="_bd566829-1276-43cb-b24c-2b121d46e113" id="sec.737-ssec.4-def.signednotice" type="definition">signed notice</defterm> means a notice signed by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_afc37ab5-4552-47cc-b2ce-7d5855981284" id="sec.737-ssec.4-def.signednotice-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for the chief inspector—the <del xml:space="preserve">chief executive</del><ins xml:space="preserve">CEO</ins>; or</txt></block></li><li guid="_1aa7d7fa-66a5-4441-8bfb-023d3efda741" id="sec.737-ssec.4-def.signednotice-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for another inspector—the chief inspector; or</txt></block></li><li guid="_f9facd9e-62b2-4d97-8912-fbc63a619168" id="sec.737-ssec.4-def.signednotice-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">for an authorised officer—the <del xml:space="preserve">chief executive</del><ins xml:space="preserve">CEO</ins>.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_742f6790-e864-42c6-970c-e9489407177b" id="sec.738" provision.type="other" spent.amends="0"><no>738</no><heading guid="_847544a8-4d0d-464a-85cb-9338d297ecd6" id="sec.738-he">Issue of identity card</heading><subclause affected.by.uncommenced="0" guid="_b04313c4-5783-402b-84af-e79ba182e660" id="sec.738-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The <del xml:space="preserve">chief executive</del><ins xml:space="preserve">CEO</ins> must issue an identity card to each person who is an inspector or authorised officer.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_444cbc82-b937-418e-ab10-272d14e1861f" id="sec.738-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The identity card must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1568b2e3-c454-4c45-96ef-3c3503ccd23c" id="sec.738-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">contain a recent photo of the person; and</txt></block></li><li guid="_513660d9-8750-46b3-ac1d-3bac324ac37d" id="sec.738-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">contain a copy of the person’s signature; and</txt></block></li><li guid="_d2778b0b-366c-4e1e-836a-dae1f9f640c5" id="sec.738-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">identify the person as an inspector or authorised officer under this Act; and</txt></block></li><li guid="_5d847507-fecb-4350-bdc6-337d776d67a5" id="sec.738-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">state an expiry date for the card.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_645ee709-019c-4d6e-bd7d-c6219541a854" id="sec.738-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">This section does not prevent the issue of a single identity card to a person for this Act and other purposes.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e86f6537-007f-4812-b33d-d8fd58da1038" id="sec.739" provision.type="other" spent.amends="0"><no>739</no><heading guid="_e9a4e9b8-2051-432c-8593-576cf3a59cbe" id="sec.739-he">Production or display of identity card</heading><subclause affected.by.uncommenced="0" guid="_280bccbc-5081-48fc-846d-80f9ebdb5559" id="sec.739-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">In exercising a power under this Act in relation to another person, an inspector or authorised officer must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ab3e315b-8114-410b-872c-4190c196d92f" id="sec.739-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">produce his or her identity card for the person’s inspection before exercising the power; or</txt></block></li><li guid="_0c4096aa-6e1d-4eb5-bdc8-c4989ab5ba4b" id="sec.739-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">have the identity card displayed so it is clearly visible to the person when exercising the power.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_457f105f-01d3-420c-9063-fb1e6f25f6f8" id="sec.739-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if it is not practicable to comply with <intref check="valid" refid="sec.739-ssec.1" target.guid="_280bccbc-5081-48fc-846d-80f9ebdb5559">subsection (1)</intref>, the inspector or authorised officer must produce the identity card for the person’s inspection at the first reasonable opportunity.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d9b0db30-3b15-4753-a21a-40841643a422" id="sec.739-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For <intref check="valid" refid="sec.739-ssec.1" target.guid="_280bccbc-5081-48fc-846d-80f9ebdb5559">subsection (1)</intref>, an inspector or authorised officer does not exercise a power in relation to a person only because the inspector or officer has entered a place as mentioned in <intref check="valid" refid="sec.743" target.guid="_ff0e974e-40ee-41fa-acf3-041974dce830">section 743</intref><intref check="valid" refid="sec.743-ssec.1" target.guid="_f7a6497a-7250-4db0-9d05-e7a91a90e582">(1)</intref><intref check="valid" refid="sec.743-ssec.1-para1.b" target.guid="_94105d65-133a-4573-a781-76f5f04029c1">(b)</intref> or <intref check="valid" refid="sec.743-ssec.2" target.guid="_c2f3c782-33c5-45f1-853e-e7fc33ae032b">(2)</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_9b17a1d9-b276-491f-acb7-1dce819a117b" id="sec.740" provision.type="other" spent.amends="0"><no>740</no><heading guid="_4ddd8e63-220a-484f-b17d-9e69365207ef" id="sec.740-he">When inspector or authorised officer ceases to hold office</heading><subclause affected.by.uncommenced="0" guid="_38838c1b-8364-4552-8153-db5be48849f7" id="sec.740-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person who is an inspector or authorised officer ceases to hold office if any of the following happens—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_752c073d-12cd-4779-8db1-5b3f3eaab90e" id="sec.740-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the term of office stated in a condition of office ends;</txt></block></li><li guid="_a9fdd456-770e-427c-86ed-3033a5a40508" id="sec.740-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">under another condition of office, the person ceases to hold the office;</txt></block></li><li guid="_3211fdf3-940e-4be5-b602-d4d8f082bcc5" id="sec.740-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the person’s resignation under <intref check="valid" refid="sec.741" target.guid="_031f849b-e4b8-4b9b-a19a-01902ee8c544">section 741</intref> takes effect.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1b89c434-4dbb-4482-9998-5f0b60b50f1d" id="sec.740-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.740-ssec.1" target.guid="_38838c1b-8364-4552-8153-db5be48849f7">Subsection (1)</intref> does not limit the ways the person may cease to hold the office.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_330b7bb1-ee00-49b0-84c2-4ecff75357a1" id="sec.740-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_f6c1beea-37fe-4fe5-a1bd-18b7891397d2" id="sec.740-ssec.3-def.conditionofoffice_"><txt break.before="1"><defterm guid="_f6f70667-8e57-4cec-a32a-e5fb661adea8" id="sec.740-ssec.3-def.conditionofoffice" type="definition">condition of office</defterm> means a condition on which the person holds office.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_031f849b-e4b8-4b9b-a19a-01902ee8c544" id="sec.741" provision.type="other" spent.amends="0"><no>741</no><heading guid="_7e5aa248-d33a-44f5-b69e-9479821a1b57" id="sec.741-he">Resignation</heading><block><txt break.before="1">An inspector or authorised officer may resign by a signed notice given to the <del xml:space="preserve">chief executive</del><ins xml:space="preserve">CEO</ins>.</txt></block></clause><clause affected.by.uncommenced="0" guid="_5a8e7872-862f-4c59-bb6a-c8d95a37e0df" id="sec.742" provision.type="other" spent.amends="0"><no>742</no><heading guid="_074d2552-803d-44ec-97cd-c55ec436faf7" id="sec.742-he">Return of identity card</heading><block><txt break.before="1">A person who ceases to be an inspector or authorised officer must return the person’s identity card to the <del xml:space="preserve">chief executive</del><ins xml:space="preserve">CEO</ins> within 20 business days after ceasing to be an inspector or authorised officer unless the person has a reasonable excuse.</txt></block><penalty guid="_af7540e5-c755-4ee1-976d-164e576cb464" id="sec.742-pen"><block><txt break.before="1">Maximum penalty—50 penalty units.</txt></block></penalty></clause></division><division affected.by.uncommenced="0" guid="_7e627d7b-a8fc-49ea-be0a-d8968bc176d2" id="ch.10-pt.1-div.2"><no>Division 2</no><heading guid="_40fe5883-d03c-4393-bd7f-7c10d55e2ec0" id="ch.10-pt.1-div.2-he">Powers of entry of inspectors and authorised officers</heading><clause affected.by.uncommenced="0" guid="_ff0e974e-40ee-41fa-acf3-041974dce830" id="sec.743" provision.type="other" spent.amends="0"><no>743</no><heading guid="_713b32f0-5d09-4b08-a087-73fe133ae65e" id="sec.743-he">Power of entry—general</heading><subclause affected.by.uncommenced="0" guid="_f7a6497a-7250-4db0-9d05-e7a91a90e582" id="sec.743-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An inspector or authorised officer may enter a place if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c6f996d1-edc8-4151-a4aa-e1acadb0caf1" id="sec.743-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">its occupier consents to the entry; or</txt></block></li><li guid="_94105d65-133a-4573-a781-76f5f04029c1" id="sec.743-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">it is a public place and the entry is made when it is open to the public; or</txt></block></li><li guid="_52a918db-566b-4749-94a6-559d8a161c8b" id="sec.743-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the entry is authorised by a warrant; or</txt></block></li><li guid="_99279f63-cd01-4fc7-abb6-a937b9516681" id="sec.743-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">it is a place of business to which this Act relates and the entry is made when the place is open for business or otherwise open for entry; or</txt></block></li><li guid="_9d3519bd-4a6f-4d08-8831-b6fa8424b0ce" id="sec.743-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">its occupier has been given a compliance direction and the entry is made, at a time or interval stated in the direction, to check compliance with the direction; or</txt></block></li><li guid="_65c46d80-a8fa-4c2c-9811-4476bab12c04" id="sec.743-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">the inspector or authorised officer may enter the place under <intref check="valid" refid="sec.744" target.guid="_cc1dee32-3360-4747-a903-fbbba0e9fcfe">sections 744</intref> to <intref check="valid" refid="sec.746" target.guid="_c862f314-b1ec-4c95-a1db-8cb498eda2fe">746</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c2f3c782-33c5-45f1-853e-e7fc33ae032b" id="sec.743-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For the purpose of asking the occupier of a place for consent to enter, an inspector or authorised officer may, without the occupier’s consent or a warrant—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_88c0d4e1-a7c4-4f0e-8dd7-2ad752ac5cb2" id="sec.743-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">enter land around premises at the place to an extent that is reasonable to contact the occupier; or</txt></block></li><li guid="_7201b14d-686a-4ef2-96e9-b741b3b284ac" id="sec.743-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">enter part of the place the inspector or authorised officer reasonably considers members of the public ordinarily are allowed to enter when they wish to contact the occupier.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_47e16333-461a-4761-a5c7-401851ab6387" id="sec.743-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_bd7aae2b-72fb-485e-b4b3-955b17703b55" id="sec.743-ssec.3-def.placeofbusiness_"><txt break.before="1"><defterm guid="_ccb8f808-dc6f-4e34-9847-e522feae391d" id="sec.743-ssec.3-def.placeofbusiness" type="definition">place of business</defterm> does not include a part of the place where a person resides.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_cc1dee32-3360-4747-a903-fbbba0e9fcfe" id="sec.744" provision.type="other" spent.amends="0"><no>744</no><heading guid="_d226a1e9-a709-452c-aa83-74bb7cecb0c0" id="sec.744-he">Inspector’s additional entry power for emergency or incident</heading><subclause affected.by.uncommenced="0" guid="_9c920ff0-9b54-45b0-beb5-f75a575d69b5" id="sec.744-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An inspector may enter a place if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3d75ad3c-7534-4b4e-b729-fde2f0c3beb0" id="sec.744-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the inspector reasonably suspects—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_345531c3-c474-4bc8-a127-d458c8962d37" id="sec.744-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">an emergency exists, or may exist, involving petroleum or fuel gas, a geothermal activity or a GHG storage activity or suspected petroleum or fuel gas, a geothermal activity or a GHG storage activity; and</txt></block></li><li guid="_7e34834b-c4a0-406d-8420-bed9c545a341" id="sec.744-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the emergency is causing, or is likely to cause imminent and significant harm to persons or damage to property; or</txt></block></li></list></block></li><li guid="_bac74f9e-b73f-420b-b6c3-082a373fc02f" id="sec.744-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an incident is happening at the place and—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9f05a48b-ef85-4352-a216-48e08c1c92ea" id="sec.744-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the incident is causing harm to persons or property; and</txt></block></li><li guid="_a67650c5-a57d-473f-b5b5-068b1165e453" id="sec.744-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">it is reasonably necessary for the inspector to enter the place to investigate and manage the incident to the extent it relates to petroleum or fuel gas, a geothermal energy activity or a GHG stream.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_cdf9d36f-f00d-4a2b-bc47-840e02f89d00" id="sec.744-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Before entering the place, the inspector must do, or make a reasonable attempt to do, each of the following things if the occupier of the place or a public official exercising functions or powers in relation to the place is present at the place—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5f45d9c6-90c1-430c-ae0b-f70a6454a601" id="sec.744-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">identify himself or herself to the occupier or official in the way stated <intref check="valid" refid="sec.739" target.guid="_e86f6537-007f-4812-b33d-d8fd58da1038">section 739</intref>;</txt></block></li><li guid="_c27ab50e-cfbf-4880-aef3-6f18b2bacd62" id="sec.744-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">tell the occupier or official the purpose of the entry;</txt></block></li><li guid="_48168c7a-fed8-4e82-924a-76b57018daa2" id="sec.744-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">seek the consent of the occupier or official to the entry;</txt></block></li><li guid="_355c7b47-e4ea-42f7-8ca0-c5855003aedf" id="sec.744-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">tell the occupier or official the inspector is permitted under this Act to enter the place without consent or a warrant;</txt></block></li><li guid="_ebd50d08-439e-499d-aaf6-28a73ae08ae3" id="sec.744-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">give the occupier or official an opportunity to allow the inspector immediate entry to the place without using force.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_4b520b81-ff01-4c30-81bc-baa9f5ed0ed3" id="sec.744-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the inspector need not comply with <intref check="valid" refid="sec.744-ssec.2" target.guid="_cdf9d36f-f00d-4a2b-bc47-840e02f89d00">subsection (2)</intref> if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3a6906be-8bad-417f-962c-3399177d12d3" id="sec.744-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for entry under <intref check="valid" refid="sec.744-ssec.1" target.guid="_9c920ff0-9b54-45b0-beb5-f75a575d69b5">subsection (1)</intref><intref check="valid" refid="sec.744-ssec.1-para1.a" target.guid="_3d75ad3c-7534-4b4e-b729-fde2f0c3beb0">(a)</intref>—the inspector reasonably believes that immediate entry to the place is required to avoid imminent and significant harm to persons or property; or</txt></block></li><li guid="_7597bd9b-ab84-469e-8df6-599dc9d9d323" id="sec.744-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for entry under <intref check="valid" refid="sec.744-ssec.1" target.guid="_9c920ff0-9b54-45b0-beb5-f75a575d69b5">subsection (1)</intref><intref check="valid" refid="sec.744-ssec.1-para1.b" target.guid="_bac74f9e-b73f-420b-b6c3-082a373fc02f">(b)</intref>—complying with the subsection may frustrate or otherwise prevent an investigation of the incident the subject of the entry.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2c9c1d3c-8d3b-492a-88c4-591c81bf434d" id="sec.744-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_22e95865-6358-4611-a878-16b880e60eb1" id="sec.744-ssec.4-def.publicofficial_"><txt break.before="1"><defterm guid="_a3158d6f-fda3-4756-9c30-dedb524d1adb" id="sec.744-ssec.4-def.publicofficial" type="definition">public official</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fcbd1261-7c17-4915-b771-0acffc63a724" id="sec.744-ssec.4-def.publicofficial-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a police officer; or</txt></block></li><li guid="_ed7de672-c65a-455c-8ec6-c86a9ed39404" id="sec.744-ssec.4-def.publicofficial-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a person who is appointed or authorised under a law to perform inspection, investigation or other enforcement functions under the law.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3ef4b787-8313-4236-a7e2-2c28270c9e67" id="sec.745" provision.type="other" spent.amends="0"><no>745</no><heading guid="_6d399f92-e2b6-4f95-b42e-a75403fdbb69" id="sec.745-he">Inspector’s additional entry power for operating plant</heading><block><txt break.before="1">An inspector may, at any reasonable time, enter a place where an operating plant is situated, other than a part of the place where a person resides.</txt></block></clause><clause affected.by.uncommenced="0" guid="_c862f314-b1ec-4c95-a1db-8cb498eda2fe" id="sec.746" provision.type="other" spent.amends="0"><no>746</no><heading guid="_f46904eb-4886-4c10-aeb5-157868614df4" id="sec.746-he">Authorised officer’s additional entry power for petroleum authority, geothermal exploration permit or GHG authority</heading><block><txt break.before="1">An authorised officer may enter the area of a petroleum authority, geothermal tenure or GHG authority at any reasonable time, other than a part of the area where a person resides.</txt></block></clause></division><division affected.by.uncommenced="0" guid="_a2f7c0e8-bec3-4ad3-baec-2620048c45a6" id="ch.10-pt.1-div.3"><no>Division 3</no><heading guid="_0d976899-8627-49f2-b07d-e521350bf8c6" id="ch.10-pt.1-div.3-he">Procedure for entry</heading><clause affected.by.uncommenced="0" guid="_233dc4ef-c11c-41be-a2af-e28a2664e333" id="sec.747" provision.type="other" spent.amends="0"><no>747</no><heading guid="_ba499056-d267-42a3-9d7a-368abc3b3f77" id="sec.747-he">Entry with consent</heading><subclause affected.by.uncommenced="0" guid="_26ab7af4-5f6b-499d-9d0c-cd44368ec0de" id="sec.747-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if an inspector or authorised officer intends to ask an occupier of a place to consent to the inspector or authorised officer or another inspector or authorised officer entering the place under <intref check="valid" refid="sec.743" target.guid="_ff0e974e-40ee-41fa-acf3-041974dce830">section 743</intref><intref check="valid" refid="sec.743-ssec.1" target.guid="_f7a6497a-7250-4db0-9d05-e7a91a90e582">(1)</intref><intref check="valid" refid="sec.743-ssec.1-para1.a" target.guid="_c6f996d1-edc8-4151-a4aa-e1acadb0caf1">(a)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c1d136d8-3153-4ba3-9509-dce99d99c6a3" id="sec.747-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Before asking for the consent, the inspector or authorised officer must tell the occupier—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dfc53222-11bb-4fac-b168-79b371a0591f" id="sec.747-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the purpose of the entry; and</txt></block></li><li guid="_f877d8b0-1250-496e-b162-30184b80bdc6" id="sec.747-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that the occupier is not required to consent.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b72387f1-ca4f-4403-8f72-dc269806b563" id="sec.747-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the consent is given, the inspector or authorised officer may ask the occupier to sign an acknowledgement of the consent.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fda3e18d-07fb-4971-bf8e-f7f1ed044e49" id="sec.747-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The acknowledgement must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_02d88e95-aaa5-4b20-8cbe-1c15bc6335bb" id="sec.747-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the occupier has been told—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_04b664a8-6a88-41a2-ba14-39b756dfb71f" id="sec.747-ssec.4-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the purpose of the entry; and</txt></block></li><li guid="_2c59be96-ec17-47d0-887d-ae6e34144346" id="sec.747-ssec.4-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">that the occupier is not required to consent; and</txt></block></li></list></block></li><li guid="_f4eb2ac2-4d01-453d-8730-25812c5138e2" id="sec.747-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the purpose of the entry; and</txt></block></li><li guid="_4012a18c-064d-4a4a-bc9a-ab180107f202" id="sec.747-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the occupier gives the inspector or authorised officer consent to enter the place and exercise powers under this division; and</txt></block></li><li guid="_cad32e72-e156-41fb-a075-b1ee4d5d1003" id="sec.747-ssec.4-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the time and date the consent was given.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a44a8a9a-3214-4fbe-bf93-6faf0250860c" id="sec.747-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the occupier signs the acknowledgement, the inspector or authorised officer must immediately give a copy to the occupier.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_282de9aa-a5a7-4bf5-a82d-227de0d9ec5d" id="sec.747-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">If—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_308c333f-9301-4c3e-a17c-ed09235cb14c" id="sec.747-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an issue arises in a proceeding about whether the occupier consented to the entry; and</txt></block></li><li guid="_2e5ccbf6-32da-465f-b23f-3605523e4130" id="sec.747-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an acknowledgement complying with <intref check="valid" refid="sec.747-ssec.4" target.guid="_fda3e18d-07fb-4971-bf8e-f7f1ed044e49">subsection (4)</intref> for the entry is not produced in evidence;</txt></block></li></list></block><block><txt break.before="1">the onus of proof is on the person relying on the lawfulness of the entry to prove the occupier consented.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_600bed97-4933-4445-a318-f1de6fc56490" id="sec.748" provision.type="other" spent.amends="0"><no>748</no><heading guid="_81a9215d-bec2-407d-a69a-31036c45d8de" id="sec.748-he">Application for warrant</heading><subclause affected.by.uncommenced="0" guid="_a62cb4f9-795b-416d-b04c-5ede914b1ff8" id="sec.748-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An inspector or authorised officer may apply to a magistrate for a warrant for a place.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b42743e4-5489-45a2-9c63-a6fe3e148aea" id="sec.748-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The inspector or authorised officer must prepare a written application that states the grounds on which the warrant is sought.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_dc959c04-bcc9-426b-81f3-056809e473bc" id="sec.748-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The written application must be sworn.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7baeb3ef-2e16-486e-bc32-8ccffc18e3c3" id="sec.748-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The magistrate may refuse to consider the application until the inspector or authorised officer gives the magistrate all the information the magistrate requires about the application in the way the magistrate requires.</txt><note guid="_f5849b72-448f-4c4e-b1c1-fa676e87f2c6" id="sec.748-ssec.4-note" type="example"><heading guid="_1b1a0e24-8b00-4508-beaf-b0cdcab6fdb7" id="sec.748-ssec.4-note-he">Example—</heading><block><txt break.before="1">The magistrate may require additional information supporting the application to be given by statutory declaration.</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_eec54641-7cc2-421b-895f-686ebef431d0" id="sec.749" provision.type="other" spent.amends="0"><no>749</no><heading guid="_9af30606-f308-4906-af37-d9abd2e51edd" id="sec.749-he">Issue of warrant</heading><subclause affected.by.uncommenced="0" guid="_7987d194-2b7f-42e2-931a-62aa486ee02d" id="sec.749-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The magistrate may issue the warrant for the place only if the magistrate is satisfied there are reasonable grounds for suspecting—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_93dd3f42-4761-4994-84e8-da3b173e7811" id="sec.749-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">there is a particular thing or activity (the <defterm guid="_9e01b76e-a661-4147-82e6-31a6f9183d16" id="sec.749-ssec.1-def.evidence" type="definition">evidence</defterm>) that may provide evidence of an offence against this Act; and</txt></block></li><li guid="_d4b10b64-2183-4d32-9b5b-efc38c4c7f07" id="sec.749-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the evidence is at the place or, within the next 7 days, will be at the place.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a6cbb794-2fba-4450-94c4-2bb351f46416" id="sec.749-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The warrant must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2aea7e28-fc05-4897-ac30-8b7f2b90cfdd" id="sec.749-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the place to which the warrant applies; and</txt></block></li><li guid="_6b3eabbc-777b-4e90-b2ef-47cae756e27d" id="sec.749-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that a stated inspector or authorised officer may, with necessary and reasonable help and force—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e04c5f39-6bdd-4973-9b94-6097133ea707" id="sec.749-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">enter the place and any other place necessary for entry to the place; and</txt></block></li><li guid="_1c94dda8-f1bb-4cab-906a-ce16d82b7718" id="sec.749-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">exercise the inspector’s or authorised officer’s powers under this part; and</txt></block></li></list></block></li><li guid="_8109044c-1701-440e-9318-ed29329c4163" id="sec.749-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">particulars of the offence that the magistrate considers appropriate in the circumstances; and</txt></block></li><li guid="_559ea8d0-ba48-4dc0-9bd2-ca89a3afb3ac" id="sec.749-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the name of the person suspected of having committed the offence, unless the name is unknown or the magistrate considers it inappropriate to state the name; and</txt></block></li><li guid="_27e8d5cd-3044-4b4a-bbf7-a5f92e819f70" id="sec.749-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the evidence that may be seized under the warrant; and</txt></block></li><li guid="_e6741e82-ccd4-4c6d-91b2-97bc2ec1b343" id="sec.749-ssec.2-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">the hours of the day or night when the place may be entered; and</txt></block></li><li guid="_41b84cd4-be69-4f37-8cca-ee7e98552d50" id="sec.749-ssec.2-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">the magistrate’s name; and</txt></block></li><li guid="_d6df55da-caf1-45ee-9494-964b4afba1c3" id="sec.749-ssec.2-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">the date and time of the warrant’s issue; and</txt></block></li><li guid="_41edfa3d-9912-4cd3-9b46-60a90363d2b7" id="sec.749-ssec.2-para1.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the date, within 14 days after the warrant’s issue, the warrant ends.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e3b2cd6b-78fb-4dff-bb74-c0af6540175d" id="sec.750" provision.type="other" spent.amends="0"><no>750</no><heading guid="_5a3b6308-c1ff-48a1-b3f7-ef8762ac8855" id="sec.750-he">Application by electronic communication and duplicate warrant</heading><subclause affected.by.uncommenced="0" guid="_b5921556-8191-40e6-8ec6-3aa44b7f8967" id="sec.750-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An application under <intref check="valid" refid="sec.749" target.guid="_eec54641-7cc2-421b-895f-686ebef431d0">section 749</intref> may be made by phone, fax, email, radio, videoconferencing or another form of electronic communication if the inspector or authorised officer reasonably considers it necessary because of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_388c3737-1f2a-4a74-894d-a78bbacb3b84" id="sec.750-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">urgent circumstances; or</txt></block></li><li guid="_bc30d32f-73ca-41ef-9d18-e69c9759b803" id="sec.750-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">other special circumstances, including, for example, the inspector’s or authorised officer’s remote location.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c24aab73-c030-4d26-ad9a-1ddc3affd104" id="sec.750-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4eeb5905-81e6-4ae1-8339-114135facce7" id="sec.750-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">may not be made before the inspector or authorised officer prepares the written application under <intref check="valid" refid="sec.748" target.guid="_600bed97-4933-4445-a318-f1de6fc56490">section 748</intref><intref check="valid" refid="sec.748-ssec.2" target.guid="_b42743e4-5489-45a2-9c63-a6fe3e148aea">(2)</intref>; but</txt></block></li><li guid="_95f7a194-eeab-4860-b02b-d8f0433895ca" id="sec.750-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">may be made before the written application is sworn.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_fbb7e674-65d1-47e8-8577-fd11976f6925" id="sec.750-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The magistrate may issue the warrant (the <defterm guid="_4f58ba5a-1b34-4388-b09a-c215dfe7a1fb" id="sec.750-def.originalwarrant" type="definition">original warrant</defterm>) only if the magistrate is satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0c00192c-a8df-455e-98c1-b9d7af50e41d" id="sec.750-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">it was necessary to make the application under <intref check="valid" refid="sec.750-ssec.1" target.guid="_b5921556-8191-40e6-8ec6-3aa44b7f8967">subsection (1)</intref>; and</txt></block></li><li guid="_ea989795-f412-4a76-bc4d-672f34316d02" id="sec.750-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the way the application was made under <intref check="valid" refid="sec.750-ssec.1" target.guid="_b5921556-8191-40e6-8ec6-3aa44b7f8967">subsection (1)</intref> was appropriate.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ff820a5e-ff26-49bf-a61a-d7ad47232626" id="sec.750-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">After the magistrate issues the original warrant—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e4cab364-c03d-48d9-889b-4bd4aa525c6f" id="sec.750-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if there is a reasonably practicable way of immediately giving a copy of the warrant to the inspector or authorised officer, for example, by sending a copy by fax or email, the magistrate must immediately give a copy of the warrant to the inspector or authorised officer; or</txt></block></li><li guid="_6863cd02-b290-45ed-8213-4d7d893b49e4" id="sec.750-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6c6306d4-64c7-403f-b881-574e318f22b0" id="sec.750-ssec.4-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the magistrate must tell the inspector or authorised officer the date and time the warrant is issued and the other terms of the warrant; and</txt></block></li><li guid="_a3bf2b62-e005-487f-9608-5c95bea509c1" id="sec.750-ssec.4-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the inspector or authorised officer must complete a form of warrant, including by writing on it—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_134b5152-6a2a-41c5-8fff-af6a4b223b86" id="sec.750-ssec.4-para1.b-para2.ii-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">the magistrate’s name; and</txt></block></li><li guid="_3c92f844-f303-4a96-924f-6101fcca1ede" id="sec.750-ssec.4-para1.b-para2.ii-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">the date and time the magistrate issued the warrant; and</txt></block></li><li guid="_bade34c9-aeaa-4fc3-80a0-7c79371431d7" id="sec.750-ssec.4-para1.b-para2.ii-para3.C" provision.type="other"><no>(C)</no><block><txt break.before="0">the other terms of the warrant.</txt></block></li></list></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0ec818e8-b93a-461a-a22b-c4b589a9676f" id="sec.750-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The copy of the warrant mentioned in <intref check="valid" refid="sec.750-ssec.4" target.guid="_ff820a5e-ff26-49bf-a61a-d7ad47232626">subsection (4)</intref><intref check="valid" refid="sec.750-ssec.4-para1.a" target.guid="_e4cab364-c03d-48d9-889b-4bd4aa525c6f">(a)</intref>, or the form of warrant completed under <intref check="valid" refid="sec.750-ssec.4" target.guid="_ff820a5e-ff26-49bf-a61a-d7ad47232626">subsection (4)</intref><intref check="valid" refid="sec.750-ssec.4-para1.b" target.guid="_6863cd02-b290-45ed-8213-4d7d893b49e4">(b)</intref> (in either case the <defterm guid="_893e76e4-2194-4cc5-95fe-0edc166d94c7" id="sec.750-def.duplicatewarrant" type="definition">duplicate warrant</defterm>), is a duplicate of, and as effectual as, the original warrant.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_37fce164-cf19-41bf-a104-16a01227e642" id="sec.750-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The inspector or authorised officer must, at the first reasonable opportunity, send the magistrate—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dc002546-4179-4155-a7b3-6c41467884ab" id="sec.750-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the written application complying with <intref check="valid" refid="sec.748" target.guid="_600bed97-4933-4445-a318-f1de6fc56490">section 748</intref><intref check="valid" refid="sec.748-ssec.2" target.guid="_b42743e4-5489-45a2-9c63-a6fe3e148aea">(2)</intref> and <intref check="valid" refid="sec.748-ssec.3" target.guid="_dc959c04-bcc9-426b-81f3-056809e473bc">(3)</intref>; and</txt></block></li><li guid="_5193f3d9-9fdc-43b0-b387-69b06d30a108" id="sec.750-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the inspector or authorised officer completed a form of warrant under <intref check="valid" refid="sec.750-ssec.4" target.guid="_ff820a5e-ff26-49bf-a61a-d7ad47232626">subsection (4)</intref><intref check="valid" refid="sec.750-ssec.4-para1.b" target.guid="_6863cd02-b290-45ed-8213-4d7d893b49e4">(b)</intref>—the completed form of warrant.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d49ffec5-3ee7-4c41-86ff-a1c483c494ad" id="sec.750-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">The magistrate must keep the original warrant and, on receiving the documents under <intref check="valid" refid="sec.750-ssec.6" target.guid="_37fce164-cf19-41bf-a104-16a01227e642">subsection (6)</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_784f7d28-a3c0-4ec9-ae50-865ff6e3db22" id="sec.750-ssec.7-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">attach the documents to the original warrant; and</txt></block></li><li guid="_607f93f6-004c-4856-ba3a-b35c2b74f6b1" id="sec.750-ssec.7-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give the original warrant and documents to the clerk of the court of the relevant magistrates court.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_aa485837-3ef0-49e6-9ffa-f9cde0fb6faa" id="sec.750-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">Despite <intref check="valid" refid="sec.750-ssec.5" target.guid="_0ec818e8-b93a-461a-a22b-c4b589a9676f">subsection (5)</intref>, if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c2b32ad6-4a57-4102-8cb5-1946b7022c33" id="sec.750-ssec.8-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an issue arises in a proceeding about whether an exercise of a power was authorised by a warrant issued under this section; and</txt></block></li><li guid="_81fa78b4-018c-478f-a5e2-7a4686f332fa" id="sec.750-ssec.8-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the original warrant is not produced in evidence;</txt></block></li></list></block><block><txt break.before="1">the onus of proof is on the person relying on the lawfulness of the exercise of the power to prove a warrant authorised the exercise of the power.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7878c9e3-a41f-45be-9b54-fc31f597e39b" id="sec.750-ssec.9" provision.type="other"><no>(9)</no><block><txt break.before="0">This section does not limit <intref check="valid" refid="sec.748" target.guid="_600bed97-4933-4445-a318-f1de6fc56490">section 748</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_79853f39-d539-4adb-8658-992231111698" id="sec.750-ssec.10" provision.type="other"><no>(10)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_d81bff3f-de01-45ac-8d6b-ca049ecfbb08" id="sec.750-ssec.10-def.relevantmagistratescourt_"><txt break.before="1"><defterm guid="_c074c739-048a-49cd-b0a7-d7f8fffbd20e" id="sec.750-ssec.10-def.relevantmagistratescourt" type="definition">relevant magistrates court</defterm>, in relation to a magistrate, means the Magistrates Court that the magistrate constitutes under the <legref check="valid" jurisd="QLD" target.doc.id="act-1991-075" target.version.series="e18c6e91-c9eb-4157-bc83-f3ebffa60949" type="act"><name emphasis="yes">Magistrates Act 1991</name></legref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1d778338-7571-405e-876f-9dca855362a6" id="sec.751" provision.type="other" spent.amends="0"><no>751</no><heading guid="_d6dacf2c-4fd6-4d03-96ed-ba51a876bd61" id="sec.751-he">Defect in relation to a warrant</heading><subclause affected.by.uncommenced="0" guid="_49fe7fb7-01ea-4d46-9214-b082db23da09" id="sec.751-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A warrant is not invalidated by a defect in the warrant, or in compliance with <intref check="valid" refid="sec.748" target.guid="_600bed97-4933-4445-a318-f1de6fc56490">section 748</intref>, <intref check="valid" refid="sec.749" target.guid="_eec54641-7cc2-421b-895f-686ebef431d0">749</intref> or <intref check="valid" refid="sec.750" target.guid="_e3b2cd6b-78fb-4dff-bb74-c0af6540175d">750</intref>, unless the defect affects the substance of the warrant in a material particular.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5fb06c94-dda1-483f-9b29-6219333ba439" id="sec.751-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_6e83fcdc-8344-4c30-abf8-469eb56fa2c8" id="sec.751-ssec.2-def.warrant_"><txt break.before="1"><defterm guid="_f0080f0b-832d-43b1-bc19-e6ca9b10279d" id="sec.751-ssec.2-def.warrant" type="definition">warrant</defterm> includes a duplicate warrant mentioned in <intref check="valid" refid="sec.750" target.guid="_e3b2cd6b-78fb-4dff-bb74-c0af6540175d">section 750</intref><intref check="valid" refid="sec.750-ssec.5" target.guid="_0ec818e8-b93a-461a-a22b-c4b589a9676f">(5)</intref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_23ee44bf-7574-449f-9a9f-53eef8b4477e" id="sec.752" provision.type="other" spent.amends="0"><no>752</no><heading guid="_3a7277a8-7740-46eb-bfb8-7fef96f8af53" id="sec.752-he">Warrants—procedure before entry</heading><subclause affected.by.uncommenced="0" guid="_b6875f71-fc6b-4c77-a811-8e665cbb1784" id="sec.752-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if an inspector or authorised officer named in a warrant issued under this division for a place is intending to enter the place under the warrant.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_75f2aaf4-8d46-4d49-a754-255c15fd7679" id="sec.752-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Before entering the place, the inspector or authorised officer must do or make a reasonable attempt to do the following things—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_788f9c62-279a-4420-a100-d8603733c655" id="sec.752-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">identify himself or herself to a person present at the place who is an occupier of the place, in the way stated in <intref check="valid" refid="sec.739" target.guid="_e86f6537-007f-4812-b33d-d8fd58da1038">section 739</intref>;</txt></block></li><li guid="_8d032117-6799-424e-911a-862340978750" id="sec.752-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give the person a copy of the warrant;</txt></block></li><li guid="_9a82558b-98d5-4a6d-b93d-605d29ce217b" id="sec.752-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">tell the person the inspector or authorised officer is permitted by the warrant to enter the place;</txt></block></li><li guid="_179e527f-2c1a-4d8f-8c4c-ca33f918cd19" id="sec.752-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">give the person an opportunity to allow the inspector or authorised officer immediate entry to the place without using force.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0523d24b-2b6c-4951-924f-c872251b30fd" id="sec.752-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the inspector or authorised officer need not comply with <intref check="valid" refid="sec.752-ssec.2" target.guid="_75f2aaf4-8d46-4d49-a754-255c15fd7679">subsection (2)</intref> if the inspector or authorised officer believes on reasonable grounds that immediate entry to the place is required to ensure the effective execution of the warrant is not frustrated.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_88b86195-c9ee-40a0-9c15-0c108d44f184" id="sec.752-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_158bc36c-94ef-4f7c-b169-26966fe06b67" id="sec.752-ssec.4-def.warrant_"><txt break.before="1"><defterm guid="_99760270-427f-4e21-8ae4-556df86cc396" id="sec.752-ssec.4-def.warrant" type="definition">warrant</defterm> includes a duplicate warrant mentioned in <intref check="valid" refid="sec.750" target.guid="_e3b2cd6b-78fb-4dff-bb74-c0af6540175d">section 750</intref><intref check="valid" refid="sec.750-ssec.5" target.guid="_0ec818e8-b93a-461a-a22b-c4b589a9676f">(5)</intref>.</txt></definition></deflist></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_998256e5-8b7c-434d-a86b-925caeb3e138" id="ch.10-pt.1-div.4"><no>Division 4</no><heading guid="_15eec976-286e-45c5-942d-0e050dca4c8f" id="ch.10-pt.1-div.4-he">Powers after entering a place</heading><clause affected.by.uncommenced="0" guid="_4fe09ee5-a766-4084-bdae-0a515adaf510" id="sec.753" provision.type="other" spent.amends="0"><no>753</no><heading guid="_aaf6e560-25ba-448c-8b9d-4558994afe44" id="sec.753-he">Application of <intref check="valid" refid="ch.10-pt.1-div.4" target.guid="_998256e5-8b7c-434d-a86b-925caeb3e138">div 4</intref></heading><subclause affected.by.uncommenced="0" guid="_7d4e1791-f096-4f34-b201-0aa04b9fec6c" id="sec.753-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This division applies if an inspector or authorised officer has, under <intref check="valid" refid="ch.10-pt.1-div.2" target.guid="_7e627d7b-a8fc-49ea-be0a-d8968bc176d2">division 2</intref>, entered a place.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_72c9a44c-1958-49f4-aca9-0e12ad7fdf41" id="sec.753-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if, under <intref check="valid" refid="sec.743" target.guid="_ff0e974e-40ee-41fa-acf3-041974dce830">section 743</intref><intref check="valid" refid="sec.743-ssec.2" target.guid="_c2f3c782-33c5-45f1-853e-e7fc33ae032b">(2)</intref>, an inspector or authorised officer enters a place to ask the occupier’s consent to enter premises, this division applies to the inspector or authorised officer only if the consent is given or the entry is otherwise authorised.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_45ab6723-37a6-4c09-8f03-3df015b52e2b" id="sec.754" provision.type="other" spent.amends="0"><no>754</no><heading guid="_9a62bdd8-9af3-4140-ae85-9cabcb6768d6" id="sec.754-he">General powers</heading><block><txt break.before="1">The inspector or authorised officer may do all or any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6999dd4a-96eb-4024-a3de-f238a47e93be" id="sec.754-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">search any part of the place;</txt></block></li><li guid="_f26f040f-92e6-489c-bd41-edb0482844ef" id="sec.754-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">inspect, measure, test, photograph or film any part of the place or anything at the place;</txt></block></li><li guid="_1c93916b-aa35-403c-b327-213c20f72693" id="sec.754-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">take a thing, or a sample of or from a thing, at the place for analysis or testing;</txt></block></li><li guid="_7c1758ad-d357-4ca4-a764-e5668d4d2eb4" id="sec.754-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">copy a document at the place;</txt></block></li><li guid="_7a6d6547-195e-4ab9-b1c8-6584a3781ca3" id="sec.754-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">take into or onto the place any person, equipment and materials the inspector or authorised officer reasonably requires for the exercise of a power under this division.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_8403991c-7c3f-4dc5-a6e0-0771400526b5" id="sec.755" provision.type="other" spent.amends="0"><no>755</no><heading guid="_f5b25513-dde9-4132-a041-80c8a5b3da17" id="sec.755-he">Power to require reasonable help</heading><subclause affected.by.uncommenced="0" guid="_4878b341-257f-4b8c-9740-1a80541f8d83" id="sec.755-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The inspector or authorised officer may require a person at the place or anywhere else, to give the inspector or authorised officer reasonable help, including, for example, by producing a document or giving information, to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1b99bd1f-fc44-45a8-be15-ed5e7f6302f6" id="sec.755-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">exercise a power under this division; or</txt></block></li><li guid="_ae875e81-4178-4d0b-a066-13339b623fbc" id="sec.755-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">work out whether this Act is being complied with.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a8a2dbcc-1fd2-4c57-a804-5c008ad9052e" id="sec.755-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">When making the requirement, the inspector or authorised officer must warn the person it is an offence to fail to comply with the requirement unless the person has a reasonable excuse.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_5ba8d6c0-4d57-41ca-b255-a9b4fb4661dd" id="sec.756" provision.type="other" spent.amends="0"><no>756</no><heading guid="_cd05641f-f592-430b-942b-6ac2ce57275b" id="sec.756-he">Failure to comply with help requirement</heading><subclause affected.by.uncommenced="0" guid="_1993833b-302a-498c-ae16-bd5b78a8cb50" id="sec.756-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person of whom a requirement under <intref check="valid" refid="sec.755" target.guid="_8403991c-7c3f-4dc5-a6e0-0771400526b5">section 755</intref> has been made must comply with the requirement unless the person has a reasonable excuse.</txt></block><penalty guid="_23a0a5e5-52dc-499f-9913-9289462a962f" id="sec.756-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_87194654-c72d-4f58-9c5e-bfd5af222e13" id="sec.756-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">It is a reasonable excuse for an individual not to comply with the requirement if complying with the requirement might tend to incriminate the individual.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_16339866-b301-46f2-83f2-81fd09233385" id="sec.756-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.756-ssec.2" target.guid="_87194654-c72d-4f58-9c5e-bfd5af222e13">subsection (2)</intref> does not apply if the requirement is to produce a document required to be held or kept by the individual under this Act.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_a75a8fc2-ed2f-486a-97ae-eb88613b779f" id="ch.10-pt.1-div.5"><no>Division 5</no><heading guid="_7d94b603-e6e8-4369-a3d5-0f8f5eb1c5e1" id="ch.10-pt.1-div.5-he">Power to obtain information</heading><clause affected.by.uncommenced="0" guid="_353defb2-0e9d-4e61-ad70-d2a39920dacd" id="sec.757" provision.type="other" spent.amends="0"><no>757</no><heading guid="_1796df0d-79a1-46c8-adaa-063dcb167e7e" id="sec.757-he">Power to require name and address</heading><subclause affected.by.uncommenced="0" guid="_86c05966-28c4-4bc5-837a-4ca26400a2a8" id="sec.757-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0c2fb4ad-e40d-402d-8749-6f7c49cec514" id="sec.757-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an inspector or authorised officer finds a person committing an offence against this Act; or</txt></block></li><li guid="_566de2eb-0f6d-4fd9-89c0-c82ad16a831e" id="sec.757-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an inspector or authorised officer finds a person in circumstances that lead, or has information that leads, the inspector or authorised officer to reasonably believe the person has just committed an offence against this Act.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0dfb6b69-d2a5-4b4b-87bc-4f6aa5865ca6" id="sec.757-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The inspector or authorised officer may require the person to state the person’s name and residential address.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0925b34c-9f5f-4302-82b8-98fd3a7e9434" id="sec.757-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">When making the requirement, the inspector or authorised officer must warn the person it is an offence to fail to state the person’s name or residential address unless the person has a reasonable excuse.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_147f5679-10b4-4d9c-8b90-318dee6b8358" id="sec.757-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The inspector or authorised officer may require the person to give evidence of the correctness of the stated name or residential address if the inspector or authorised officer reasonably suspects the stated name or address to be false.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a890ccf4-e147-4303-901b-3c8039d8371a" id="sec.758" provision.type="other" spent.amends="0"><no>758</no><heading guid="_ccd863c8-cbd4-46c3-8889-0918c959860e" id="sec.758-he">Power to require production of documents</heading><subclause affected.by.uncommenced="0" guid="_23848727-7ce2-4592-8263-9e8639e6cb23" id="sec.758-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An inspector or authorised officer may require a person to make available for inspection by an inspector or authorised officer, or produce to the inspector or authorised officer for inspection, at a reasonable time and place nominated by the inspector or authorised officer—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e24db021-2cdc-40b0-921f-310173813c27" id="sec.758-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a document given to the person under this Act; or</txt></block></li><li guid="_287d3438-b18b-4aa3-bc1e-111022661221" id="sec.758-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a document required to be held, kept or made by the person under this Act.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f5cfe7b9-11cd-49f1-9314-bc430cf0f47a" id="sec.758-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The inspector or authorised officer may ask the person to give the inspector or authorised officer a copy of the document within a reasonable period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3f4ebe28-cece-4213-8e87-774787738b0f" id="sec.758-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the inspector or authorised officer asks for and is given a copy of a document mentioned in <intref check="valid" refid="sec.758-ssec.1" target.guid="_23848727-7ce2-4592-8263-9e8639e6cb23">subsection (1)</intref><intref check="valid" refid="sec.758-ssec.1-para1.b" target.guid="_287d3438-b18b-4aa3-bc1e-111022661221">(b)</intref>, the inspector or officer may require the person responsible for keeping the document to certify the copy as a true copy of the document.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_81f9c11c-8d30-4637-8769-768c9bba07e3" id="sec.758-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If a request under <intref check="valid" refid="sec.758-ssec.2" target.guid="_f5cfe7b9-11cd-49f1-9314-bc430cf0f47a">subsection (2)</intref> is not complied with within a reasonable period, the inspector or authorised officer may—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_01cae911-aa54-4c5c-9cd9-4abf84042324" id="sec.758-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">take the document to copy it; and</txt></block></li><li guid="_8ed81415-3009-437e-a339-cbf6b20b0b7a" id="sec.758-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">require the person responsible for keeping the document to certify the copy as a true copy of the document.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_57c13421-fc9d-4788-bd4f-a416179a3901" id="sec.758-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The inspector or authorised officer must return the document to the person as soon as practicable after copying it.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_72dc36f9-d630-47ed-9f14-e3228f056e98" id="sec.758-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">However, if a requirement is made of a person under <intref check="valid" refid="sec.758-ssec.3" target.guid="_3f4ebe28-cece-4213-8e87-774787738b0f">subsection (3)</intref> or <intref check="valid" refid="sec.758-ssec.4" target.guid="_81f9c11c-8d30-4637-8769-768c9bba07e3">(4)</intref>, the inspector or authorised officer may keep the document until the person complies with the requirement.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_881fc17e-9bb3-49cb-86fd-cded753ccbb7" id="sec.759" provision.type="other" spent.amends="0"><no>759</no><heading guid="_33ec18ba-22d9-419b-85a6-42d5c23adb00" id="sec.759-he">Failure to produce document</heading><subclause affected.by.uncommenced="0" guid="_9cf51277-5cb0-4829-9929-cddacdf58c03" id="sec.759-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person of whom a requirement under <intref check="valid" refid="sec.758" target.guid="_a890ccf4-e147-4303-901b-3c8039d8371a">section 758</intref><intref check="valid" refid="sec.758-ssec.1" target.guid="_23848727-7ce2-4592-8263-9e8639e6cb23">(1)</intref> has been made must comply with the requirement unless the person has a reasonable excuse.</txt></block><penalty guid="_eafb4531-5f44-4a08-a546-dcf43d1aea14" id="sec.759-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_742b8327-fffc-4b92-b4fa-320a4abdaca7" id="sec.759-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">It is a reasonable excuse for an individual not to comply with a document production requirement if complying with the requirement might tend to incriminate the individual.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b2e2aa3f-2d47-426b-9d51-71ec68c6ffc5" id="sec.759-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.759-ssec.2" target.guid="_742b8327-fffc-4b92-b4fa-320a4abdaca7">subsection (2)</intref> does not apply if the requirement is to produce a document required to be held or kept by the person under this Act.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_ff5fd18f-0dd2-4c95-b2ac-29818986faa0" id="sec.760" provision.type="other" spent.amends="0"><no>760</no><heading guid="_89fbc32f-4205-408f-bc84-0ffda59305a9" id="sec.760-he">Failure to certify copy of document</heading><block><txt break.before="1">A person of whom a requirement under <intref check="valid" refid="sec.758" target.guid="_a890ccf4-e147-4303-901b-3c8039d8371a">section 758</intref><intref check="valid" refid="sec.758-ssec.3" target.guid="_3f4ebe28-cece-4213-8e87-774787738b0f">(3)</intref> or <intref check="valid" refid="sec.758-ssec.4" target.guid="_81f9c11c-8d30-4637-8769-768c9bba07e3">(4)</intref><intref check="valid" refid="sec.758-ssec.4-para1.b" target.guid="_8ed81415-3009-437e-a339-cbf6b20b0b7a">(b)</intref> has been made must comply with the requirement unless the person has a reasonable excuse.</txt></block><penalty guid="_937fc3a5-6b64-4428-87a2-4150d996597e" id="sec.760-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></clause><clause affected.by.uncommenced="0" guid="_cd919459-f64c-4ebf-b075-61af9a076b32" id="sec.761" provision.type="other" spent.amends="0"><no>761</no><heading guid="_2e2247ee-e4c0-48eb-878f-0a0097281727" id="sec.761-he">Power to require information</heading><subclause affected.by.uncommenced="0" guid="_fdb311ce-ca86-4949-8fa0-98ef41cdc485" id="sec.761-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if an inspector or authorised officer reasonably believes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5ecdc90e-9be5-49bf-996b-b51b2d60cbe5" id="sec.761-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an offence against this Act has been committed; and</txt></block></li><li guid="_0e2736af-48ad-4b7b-8016-420df5b3532a" id="sec.761-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a person may be able to give information about the offence.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_26c40c0d-15e8-4ae4-bdf7-f50e4d8e3718" id="sec.761-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The inspector or authorised officer may, by a notice given to the person, require the person to give information about the offence to the inspector or authorised officer at a stated reasonable place and at a stated reasonable time.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_fb3b0113-4ba5-4da4-866c-e3002a35f0bc" id="sec.762" provision.type="other" spent.amends="0"><no>762</no><heading guid="_26ce9b52-4ada-4570-a8a7-614e396aa894" id="sec.762-he">Failure to comply with information requirement</heading><subclause affected.by.uncommenced="0" guid="_5b6b2037-e447-461e-89e6-5ed1e93ef07d" id="sec.762-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person to whom a notice under <intref check="valid" refid="sec.761" target.guid="_cd919459-f64c-4ebf-b075-61af9a076b32">section 761</intref> has been given must comply with the notice unless the person has a reasonable excuse.</txt></block><penalty guid="_a4b296f4-d77c-4b8d-9236-44be4126baac" id="sec.762-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_484e0678-c56b-4f5a-b7b9-b83e67090082" id="sec.762-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">It is a reasonable excuse for an individual to fail to give information if giving the information might tend to incriminate the individual.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_28bd400e-def0-4d88-8e8a-0bea9c6ecbdd" id="ch.10-pt.1-div.6"><no>Division 6</no><heading guid="_481737d1-acc1-4bef-bd67-56aa150d2790" id="ch.10-pt.1-div.6-he">Seizure and forfeiture</heading><subdivision affected.by.uncommenced="0" guid="_878ca613-2e70-4b16-830c-e1736e94f16c" id="ch.10-pt.1-div.6-sdiv.1"><no>Subdivision 1</no><heading guid="_a7468acd-f21f-4c30-866e-3292dcac2e9a" id="ch.10-pt.1-div.6-sdiv.1-he">Seizure powers</heading><clause affected.by.uncommenced="0" guid="_fba3a0e3-1547-4715-86d4-cb31483f63b8" id="sec.763" provision.type="other" spent.amends="0"><no>763</no><heading guid="_530c3745-aacf-4bbc-aace-72ef2d82d257" id="sec.763-he">Power to seize things</heading><subclause affected.by.uncommenced="0" guid="_b10d9ed3-45b6-43da-83b6-3c6505cbf18a" id="sec.763-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An inspector or authorised officer who, under this part, enters a place may seize a thing at the place if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8fb3835d-57c3-4bb3-8cbf-6b9e37ac59f5" id="sec.763-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the inspector or authorised officer reasonably believes the thing—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5d3f7fe4-c80c-484c-af53-82ce0d58dc9e" id="sec.763-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">is, or may be, evidence of an offence against this Act; or</txt></block></li><li guid="_5b4123fa-6365-4d69-ac66-8605c49708f3" id="sec.763-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">may be required to investigate an incident; and</txt></block></li></list></block></li><li guid="_3b89dd72-8d9f-4865-8dc4-829bd42eaee5" id="sec.763-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for an entry made with the occupier’s consent—seizure of the thing is consistent with the purpose of entry as told to the occupier.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d7b64578-b118-4064-800f-d9cba972cf31" id="sec.763-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An inspector or authorised officer who enters a place under a warrant may seize the evidence for which the warrant was issued.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5566b6fd-d4d8-4330-b527-f715a8c25279" id="sec.763-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">An inspector or authorised officer may also seize anything else at a place mentioned in <intref check="valid" refid="sec.763-ssec.1" target.guid="_b10d9ed3-45b6-43da-83b6-3c6505cbf18a">subsection (1)</intref> or <intref check="valid" refid="sec.763-ssec.2" target.guid="_d7b64578-b118-4064-800f-d9cba972cf31">(2)</intref> if the inspector or officer reasonably believes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f746457e-a9ac-4353-9292-153ed3785bdf" id="sec.763-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the thing is, or may be, evidence of an offence against this Act; or</txt></block></li><li guid="_3873aa56-f5e3-48f4-b5cb-b806cb7c0c35" id="sec.763-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the seizure is necessary to prevent the thing being destroyed, hidden or lost or used to continue or repeat the offence; or</txt></block></li><li guid="_653e4359-74e5-4ae7-b13b-f5fb3ba5f358" id="sec.763-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the thing has just been used in committing an offence against this Act.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_ac0c3c0d-5a04-43a5-830d-1dabdf285a92" id="sec.764" provision.type="other" spent.amends="0"><no>764</no><heading guid="_e9c486a5-81a8-4b7c-8840-d26a3fd0caae" id="sec.764-he">Seizure of thing subject to security</heading><subclause affected.by.uncommenced="0" guid="_e717ba96-1c3b-45b7-8a23-1683abbb2db5" id="sec.764-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An inspector or authorised officer may, under this Act, seize a thing or exercise powers in relation to it despite a lien or other security over it claimed by another person.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_28b1e9ec-446f-4693-bf61-687006cd282d" id="sec.764-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the seizure does not affect the person’s claim to the lien or other security against a person other than the inspector or authorised officer or a person acting for the inspector or authorised officer.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_33431279-7fda-4ead-862e-3ff3d0e356d9" id="ch.10-pt.1-div.6-sdiv.2"><no>Subdivision 2</no><heading guid="_a32ecbd6-18ad-4861-9c36-e22375147597" id="ch.10-pt.1-div.6-sdiv.2-he">Powers to support seizure</heading><clause affected.by.uncommenced="0" guid="_e3a5f626-a2f1-4956-8530-01ef8e3ea563" id="sec.765" provision.type="other" spent.amends="0"><no>765</no><heading guid="_536438a7-e1c8-490b-aa4e-59ee581ca0f3" id="sec.765-he">Directions to person in control</heading><subclause affected.by.uncommenced="0" guid="_8c154c44-8c23-406d-9d27-ec0a0cd6b99a" id="sec.765-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">To enable a thing to be seized under this part, an inspector or authorised officer may require the person in control of it—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_754d058e-ed22-44aa-8512-acd16b1c8397" id="sec.765-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to take it to a stated reasonable place by a stated reasonable time; and</txt></block></li><li guid="_80eed4ae-bd56-4573-9710-1d5d8e9b5749" id="sec.765-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if necessary, to remain in control of it at the stated place for a stated reasonable period.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_161c0903-f026-4b37-8cd7-678ec68fed69" id="sec.765-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The requirement—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3453a6f3-6236-4e64-9c49-fe45751e1b33" id="sec.765-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must be made by notice; or</txt></block></li><li guid="_4b9781d4-a9c5-4bbb-bb4f-d41977890800" id="sec.765-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if for any reason it is not practicable to give the notice, may be made orally and confirmed by a notice in the approved form as soon as practicable.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_58b3e990-df96-41ab-8db9-955eeb130b48" id="sec.766" provision.type="other" spent.amends="0"><no>766</no><heading guid="_a6204cbd-9afe-4742-b5b0-4a34fefe74a0" id="sec.766-he">Failure to comply with seizure requirement</heading><block><txt break.before="1">A person of whom a requirement under <intref check="valid" refid="sec.765" target.guid="_e3a5f626-a2f1-4956-8530-01ef8e3ea563">section 765</intref> has been made must comply with the requirement unless the person has a reasonable excuse.</txt></block><penalty guid="_88758c24-a339-4569-a145-db8a60245344" id="sec.766-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty><note guid="_c81634ac-298e-49f6-beb0-e5d00499642e" id="sec.766-note" type="example"><heading guid="_3e71e480-ecff-42d7-a80a-13dcbe9f5f34" id="sec.766-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></clause><clause affected.by.uncommenced="0" guid="_f2af2a5f-dfe3-44ef-a1ca-05f4fc8d3a8d" id="sec.767" provision.type="other" spent.amends="0"><no>767</no><heading guid="_be494553-0ff8-4157-b43d-c4a3fee6f248" id="sec.767-he">General powers for seized things</heading><block><txt break.before="1">Having seized a thing under this part, an inspector or authorised officer may do 1 or more of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_add9a9e6-1fa8-494f-82d3-537468410934" id="sec.767-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">move it from the place where it was seized;</txt></block></li><li guid="_cf39343c-8882-4eee-92e4-c2255db29c61" id="sec.767-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">leave it at the place but take reasonable action to restrict access to it;</txt><note guid="_598a3fd4-45fa-44f9-a4b9-e5853cc191f8" id="sec.767-para1.b-note" type="example"><heading guid="_5472bf61-8032-4c44-b49a-f5415d8c7d40" id="sec.767-para1.b-note-he">Examples of restricting access to a thing—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_a5966ea6-3c17-48e3-9cfb-081f68cf004f" id="sec.767-para1.b-note-para2.1" provision.type="other"><no>1</no><block><txt break.before="0">brand, mark, seal, tag or otherwise identify it to show access to it is restricted</txt></block></li><li guid="_5d0ee45c-abd3-4818-9194-6157d9b53ac9" id="sec.767-para1.b-note-para2.2" provision.type="other"><no>2</no><block><txt break.before="0">sealing the entrance to a room where the thing is situated and marking it to show access to it is restricted</txt></block></li></list></block></note></block></li><li guid="_e728bb33-6878-482a-b545-9e4a28d6e4c2" id="sec.767-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">for equipment—make it inoperable.</txt><note guid="_c772b40c-ecb8-4422-ac6c-714552eb0c94" id="sec.767-para1.c-note" type="example"><heading guid="_510b35d7-e002-47ca-b2aa-87df2cba34e0" id="sec.767-para1.c-note-he">Example of making equipment inoperable—</heading><block><txt break.before="1">dismantling equipment or removing a component of equipment without which the equipment is not capable of being used</txt></block></note></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_90e390fe-9825-4199-83d3-6124a24fb0c8" id="sec.768" provision.type="other" spent.amends="0"><no>768</no><heading guid="_47250dc2-899d-42e6-9d6a-b8775fcb440f" id="sec.768-he">Offence to unlawfully interfere with seized thing</heading><subclause affected.by.uncommenced="0" guid="_36f6db5d-bf09-4d05-8210-d63e50313c17" id="sec.768-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person, other than an inspector or authorised officer, must not do, or attempt to do, any of the following acts in relation to a thing seized under this part unless the person has a reasonable excuse—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_62fff58c-2057-4299-b796-0844463ddbe8" id="sec.768-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">unlawfully interfere with the thing or something done under <intref check="valid" refid="sec.767" target.guid="_f2af2a5f-dfe3-44ef-a1ca-05f4fc8d3a8d">section 767</intref><intref check="valid" refid="sec.767-para1.b" target.guid="_cf39343c-8882-4eee-92e4-c2255db29c61">(b)</intref> to restrict access to it;</txt></block></li><li guid="_d7ee5bf7-6416-43e6-9580-7a11ea6da747" id="sec.768-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">enter, or be at, the place where the thing is being kept;</txt></block></li><li guid="_3fe58489-4039-49f9-b1f5-1cb97fb9b28e" id="sec.768-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">move the thing from the place where it is being kept.</txt></block></li></list></block><penalty guid="_e0072132-ba82-415c-b55c-c28e345d2560" id="sec.768-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_e0492b2d-27cb-445e-915d-e2201a07045e" id="sec.768-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">It is a reasonable excuse if the act is authorised by an inspector or authorised officer.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_6fda816d-0406-40a8-bf0b-a73f35014e4d" id="sec.769" provision.type="other" spent.amends="0"><no>769</no><heading guid="_c73be6b8-7844-40cb-a631-eb4dac56298a" id="sec.769-he">Testing seized things</heading><subclause affected.by.uncommenced="0" guid="_41048d47-55b8-420b-a035-24970d534fa4" id="sec.769-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An inspector may carry out, or arrange to have carried out, scientific or other tests on a thing seized under this Act to investigate an incident.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a430db9d-2258-4d99-93bb-a076d334f001" id="sec.769-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The testing may have the effect of destroying the thing if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_76a0c3ce-71c2-4115-a76e-b94b10ff2ed9" id="sec.769-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the thing is a sample of petroleum or fuel gas, geothermal energy, or a part of a GHG stream; or</txt></block></li><li guid="_c73df9c4-c378-4a04-ad2a-b2aed2899cc0" id="sec.769-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for another thing—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fa24bfbd-9fea-48e0-bb8b-9f7a7ce8dc27" id="sec.769-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">its destruction is necessary for the carrying out of the test; and</txt></block></li><li guid="_29d57b19-763e-4730-a31c-1c22afcc56ab" id="sec.769-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">there is no other reasonable course available to achieve the purpose of the test; and</txt></block></li><li guid="_8bd68199-d5fc-42c6-b216-c7d7e8f432da" id="sec.769-ssec.2-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0"><intref check="valid" refid="sec.769-ssec.3" target.guid="_500387f6-27c2-4fc9-827c-1ab36fb6bd7e">subsections (3)</intref> to <intref check="valid" refid="sec.769-ssec.6" target.guid="_5fd7c91c-d948-4aec-b17e-188ee47c34cf">(6)</intref> are complied with.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_500387f6-27c2-4fc9-827c-1ab36fb6bd7e" id="sec.769-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For <intref check="valid" refid="sec.769-ssec.2" target.guid="_a430db9d-2258-4d99-93bb-a076d334f001">subsection (2)</intref><intref check="valid" refid="sec.769-ssec.2-para1.b" target.guid="_c73df9c4-c378-4a04-ad2a-b2aed2899cc0">(b)</intref><intref check="valid" refid="sec.769-ssec.2-para1.b-para2.iii" target.guid="_8bd68199-d5fc-42c6-b216-c7d7e8f432da">(iii)</intref>, the chief inspector must give any owner of the thing of whom the chief inspector is aware a notice of the proposed test before it is carried out.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bd72e9da-8fed-423e-96c3-e58f26a55b87" id="sec.769-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The notice must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cd0f2b47-46e8-4fa5-921e-988eb0199fe6" id="sec.769-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a reasonable period for the owner to lodge submissions as to why the thing should be preserved; and</txt></block></li><li guid="_c61cb6cf-336e-404f-8f9b-ff8ba930632c" id="sec.769-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">where the submissions may be lodged.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5b40968a-a510-4d66-91ab-b014324bd300" id="sec.769-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Before destroying the thing the chief inspector must consider any submissions lodged by the owner during the stated period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5fd7c91c-d948-4aec-b17e-188ee47c34cf" id="sec.769-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_01faa273-8b00-4213-827e-f285a8234178" id="sec.769-ssec.6-def.geothermalenergy_"><txt break.before="1"><defterm guid="_f1fe92b4-2652-4c76-b44b-5a9bd596759d" id="sec.769-ssec.6-def.geothermalenergy" type="definition">geothermal energy</defterm> means energy in the form of heat produced from beneath the surface of solid earth.</txt></definition></deflist></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_e0c5ba5b-eb96-47ad-99d5-b6f7bff85928" id="ch.10-pt.1-div.6-sdiv.3"><no>Subdivision 3</no><heading guid="_ef3bfd5b-4260-4d59-839b-9ad2a97a8f1b" id="ch.10-pt.1-div.6-sdiv.3-he">Safeguards for seized property</heading><clause affected.by.uncommenced="0" guid="_444a6f9d-b57a-41dd-a26d-7d21edd4ff18" id="sec.770" provision.type="other" spent.amends="0"><no>770</no><heading guid="_16877191-c230-4f86-90e2-0b75b7cbcced" id="sec.770-he">Receipt and information notice for seized things</heading><subclause affected.by.uncommenced="0" guid="_dcc30df9-0f60-40b3-9bbb-dc70d094f8ce" id="sec.770-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">As soon as possible after an inspector or authorised officer seizes a thing, the inspector or authorised officer must give the person from whom it was seized—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1a99a7ec-ce9b-437f-abbc-79f3b94b04b6" id="sec.770-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a receipt for the thing that generally describes the thing and its condition; and</txt></block></li><li guid="_67ba9213-b19b-4844-aa1d-68420473e631" id="sec.770-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an information notice about the decision to make the seizure.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5892e36c-56eb-4282-b7ab-5db5de861272" id="sec.770-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if for any reason it is not practicable to comply with <intref check="valid" refid="sec.770-ssec.1" target.guid="_dcc30df9-0f60-40b3-9bbb-dc70d094f8ce">subsection (1)</intref>, the inspector or authorised officer must leave the receipt at the place where it was seized, in a reasonably secure way and in a conspicuous position.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1770be3d-c85a-4e9c-9521-59e6fa05b82d" id="sec.770-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The information notice and receipt may—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_97bef36e-4448-491f-980b-8f106897c5bb" id="sec.770-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be given in the same document; and</txt></block></li><li guid="_ae8e2601-ff06-47af-92c8-889406655ddc" id="sec.770-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">relate to more than 1 seized thing.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_59468c86-7526-4e9d-b986-7028b2a4c32e" id="sec.770-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">This section does not apply to a thing if it is impractical or would be unreasonable to give the receipt, given the thing’s nature, condition and value.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7697c8ce-b32a-4cb1-8c75-8e3ae0e8ebac" id="sec.771" provision.type="other" spent.amends="0"><no>771</no><heading guid="_9fc2320e-7313-4f03-9331-e8856512e896" id="sec.771-he">Access to seized things</heading><subclause affected.by.uncommenced="0" guid="_1b4b5a8f-8d00-44a3-960c-2e7ec9f2ca91" id="sec.771-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Until a thing seized under this Act is forfeited or returned, an inspector or authorised officer must allow its owner to inspect it and, if it is a document, to copy it.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_cca75cd0-7193-4876-be5d-a1fbbbebaf51" id="sec.771-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.771-ssec.1" target.guid="_1b4b5a8f-8d00-44a3-960c-2e7ec9f2ca91">Subsection (1)</intref> does not apply if it is impracticable or would be unreasonable to allow the inspection or copying.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_88f0a24b-9f8b-4444-89dd-84d324c4664c" id="sec.772" provision.type="other" spent.amends="0"><no>772</no><heading guid="_6606d8c2-6aeb-4502-8028-41c17703623e" id="sec.772-he">Return of seized things</heading><subclause affected.by.uncommenced="0" guid="_3540d931-1de6-4576-bb0c-84c41139a61e" id="sec.772-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a seized thing has some intrinsic value and is not forfeited.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c1c589aa-284d-4f69-992f-e70b49074e86" id="sec.772-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the thing is not returned to its owner within 1 year after it was seized, the owner may apply to the chief inspector for its return.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f73cb12f-597c-4209-b31c-b9f495bd452f" id="sec.772-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Within 30 days after receiving the application, the chief inspector must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2ffadc9c-b84d-4be1-9cfb-b8c8aa965cb6" id="sec.772-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the chief inspector is satisfied there are reasonable grounds for retaining the thing and decides to retain it—give the owner an information notice for the decision; or</txt></block></li><li guid="_8db3574c-206c-4f72-a158-a6deb92579af" id="sec.772-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—return the thing to the owner.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9da4de75-9af6-4803-a79d-8fb162b38114" id="sec.772-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If, at any time after the thing was seized, the chief inspector stops being satisfied there are reasonable grounds for retaining it, the chief inspector must return it to its owner.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_43541013-d518-4705-9e60-902b58eb1356" id="sec.772-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.772-ssec.3" target.guid="_f73cb12f-597c-4209-b31c-b9f495bd452f">subsections (3)</intref> and <intref check="valid" refid="sec.772-ssec.4" target.guid="_9da4de75-9af6-4803-a79d-8fb162b38114">(4)</intref>, there are reasonable grounds for retaining the thing if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_870b7714-00de-4415-802e-db4ca31990e4" id="sec.772-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the thing is being, or is likely to be, examined; or</txt></block></li><li guid="_4c422d15-c8b3-4fcc-8895-31784dad35bd" id="sec.772-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the thing is needed, or may be needed, for the purposes of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ea93933d-8784-4723-a6c2-66e4090fefdf" id="sec.772-ssec.5-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">an investigation, board of inquiry, coroner’s inquest or proceeding for an offence against this Act that is likely to be started; or</txt></block></li><li guid="_696d1c2a-2f8f-40cc-a967-de95c7ab1fd3" id="sec.772-ssec.5-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">an investigation, board of inquiry, coroner’s inquest or proceeding for an offence against this Act that has been started but not completed; or</txt></block></li><li guid="_5bff0e2f-d1da-4c82-a6a9-d4ed7124a4ff" id="sec.772-ssec.5-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">an appeal from a decision in a proceeding for an offence against this Act; or</txt></block></li></list></block></li><li guid="_6732663d-c624-4adf-a264-54138dc0e9fa" id="sec.772-ssec.5-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">it is not lawful for the owner to possess the thing.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_023a6bdd-153e-4de0-b7ca-7f29b1aa2a17" id="sec.772-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_cadda757-7fee-49a2-ba07-4c4b23f2c756" id="sec.772-ssec.6-def.examine_"><txt break.before="1"><defterm guid="_61e69cb7-501d-41e4-acf6-57bb2b27fe99" id="sec.772-ssec.6-def.examine" type="definition">examine</defterm> includes analyse, test, measure, weigh, grade, gauge and identify.</txt></definition></deflist></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_3fcad5be-dc20-4268-b5e0-3de9de17ce60" id="ch.10-pt.1-div.6-sdiv.4"><no>Subdivision 4</no><heading guid="_02aa4092-10ae-443e-a0b8-db645d9c1604" id="ch.10-pt.1-div.6-sdiv.4-he">Forfeiture</heading><clause affected.by.uncommenced="0" guid="_938bcb8c-b81d-41c0-9d2e-486ff6ffbeea" id="sec.773" provision.type="other" spent.amends="0"><no>773</no><heading guid="_61d3756e-3cc5-4eef-abef-bf96e1a8b287" id="sec.773-he">Forfeiture of seized things</heading><subclause affected.by.uncommenced="0" guid="_976ba95d-f24c-49da-b6f8-b6a4ddc1ea05" id="sec.773-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The <del xml:space="preserve">chief executive</del><ins xml:space="preserve">CEO</ins> or the chief inspector may decide to forfeit a thing seized under this Act if the inspector or authorised officer (the <defterm guid="_1834f9a0-1f2d-4df7-b4c9-9c0ed8863e68" id="sec.773-def.seizingofficer" type="definition">seizing officer</defterm>) who seized the thing—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8d898a7c-2f93-4f61-b869-cf11fda55171" id="sec.773-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">can not find its owner, after making reasonable inquiries; or</txt></block></li><li guid="_13caa9bc-68da-4fc8-8beb-75e4f5cec54d" id="sec.773-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">can not return it to its owner, after making reasonable efforts; or</txt></block></li><li guid="_7108f412-5a67-4fa7-a43d-7782ffa54001" id="sec.773-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">reasonably believes it is necessary to retain the thing to prevent it being used to commit an offence against this Act; or</txt></block></li><li guid="_6f689f95-3f36-4e7a-91ff-ac34f57f043c" id="sec.773-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">reasonably considers it is dangerous to the extent that, to ensure safety, it must be destroyed; or</txt></block></li><li guid="_0e15684f-cee1-4e35-8a7a-09a39de02a00" id="sec.773-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">reasonably considers it has no intrinsic value and use.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_804078a0-3fb9-486a-9ed4-0659ad2490f6" id="sec.773-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.773-ssec.1" target.guid="_976ba95d-f24c-49da-b6f8-b6a4ddc1ea05">subsection (1)</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f30ea21f-959f-4203-a3d0-08a5eb938c37" id="sec.773-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the period over which the efforts or enquires are made must be at least 5 business days; and</txt></block></li><li guid="_7be0c163-50ff-4afe-9613-6c4879523309" id="sec.773-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the seizing officer is not required to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c00b9f06-ecd6-4b6a-921e-79e02e891771" id="sec.773-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">make efforts if it would be unreasonable to make efforts to return the thing to its owner; or</txt></block></li><li guid="_811fc826-a046-48bb-8171-945a556fe78f" id="sec.773-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">make inquiries if it would be unreasonable to make inquiries to find the owner.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_26bf52a4-a346-4fb3-89ae-e42f87e9fe53" id="sec.773-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the <del xml:space="preserve">chief executive</del><ins xml:space="preserve">CEO</ins> or chief inspector decides under <intref check="valid" refid="sec.773-ssec.1" target.guid="_976ba95d-f24c-49da-b6f8-b6a4ddc1ea05">subsection (1)</intref><intref check="valid" refid="sec.773-ssec.1-para1.c" target.guid="_7108f412-5a67-4fa7-a43d-7782ffa54001">(c)</intref>, <intref check="valid" refid="sec.773-ssec.1-para1.d" target.guid="_6f689f95-3f36-4e7a-91ff-ac34f57f043c">(d)</intref> or <intref check="valid" refid="sec.773-ssec.1-para1.e" target.guid="_0e15684f-cee1-4e35-8a7a-09a39de02a00">(e)</intref> to forfeit a thing, the former owner of the thing immediately before the forfeiture must be given an information notice about the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d86bef94-59d3-4161-b42f-d806e4f123ce" id="sec.773-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0"><intref check="valid" refid="sec.773-ssec.3" target.guid="_26bf52a4-a346-4fb3-89ae-e42f87e9fe53">Subsection (3)</intref> does not apply if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e59e367e-5916-412e-9847-49fefa5eb928" id="sec.773-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the seizing officer can not find the owner, after making reasonable inquiries; or</txt></block></li><li guid="_7d96e257-c08b-4003-9ffe-9c9c8b2c27ef" id="sec.773-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">it is impracticable or would be unreasonable to give the information notice.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ab5d4a66-1e91-4a2c-9acd-2103fd0cb597" id="sec.773-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Regard must be had to a thing’s nature, condition and value—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f2a4f3be-b41d-4cb2-be24-af91bc73274e" id="sec.773-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in deciding—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1b0c41ac-4737-4290-8213-18ab901c2869" id="sec.773-ssec.5-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">whether it is reasonable to make inquiries or efforts; and</txt></block></li><li guid="_f3a04ff0-10ea-4e22-b66a-521c650203da" id="sec.773-ssec.5-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if making inquiries or efforts, what inquiries or efforts, including the period over which they are made, are reasonable; or</txt></block></li></list></block></li><li guid="_7fdda2bc-8376-4712-a94d-3e13dc289883" id="sec.773-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">in deciding whether it would be unreasonable to give the information notice.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0c7336d0-30a5-418c-82e0-2d85befd5100" id="sec.774" provision.type="other" spent.amends="0"><no>774</no><heading guid="_c7c331de-bc69-49aa-86d8-45f36d7474b8" id="sec.774-he">Dealing with forfeited things</heading><subclause affected.by.uncommenced="0" guid="_d6431675-01b7-4d0e-b5e6-9bc00e0550f0" id="sec.774-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">On the forfeiture of a thing to the State, it becomes the State’s property.</txt><note guid="_f9e94f68-c6b3-450f-ad6c-23e16a7cc88b" id="sec.774-ssec.1-note" type="example"><heading guid="_11ba92e3-b205-435c-86b4-257715dcfaca" id="sec.774-ssec.1-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.841" target.guid="_7273e0e9-2e56-4b5f-b665-e8245ca76320">section 841</intref>.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_5b326be0-1b62-434b-b8e6-5b623a126bd7" id="sec.774-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The <del xml:space="preserve">chief executive</del><ins xml:space="preserve">CEO</ins> or chief inspector may deal with the thing for the State in any way the <del xml:space="preserve">chief executive</del><ins xml:space="preserve">CEO</ins> or chief inspector considers appropriate, including, for example, by destroying it or giving it away.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_51f6c31b-bcfa-414b-b6b9-8c2c1c06af04" id="sec.774-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the <del xml:space="preserve">chief executive</del><ins xml:space="preserve">CEO</ins> or chief inspector must not deal with the thing in a way that could prejudice the outcome of an appeal or review under this Act of which the <del xml:space="preserve">chief executive</del><ins xml:space="preserve">CEO</ins> or chief inspector is aware.</txt></block></subclause></clause></subdivision></division><division affected.by.uncommenced="0" guid="_0b3435cf-ced0-468f-8bf0-a70848959ab6" id="ch.10-pt.1-div.7"><no>Division 7</no><heading guid="_2956d792-43ae-4a7e-9afc-fbc56541db14" id="ch.10-pt.1-div.7-he">Notice of damage caused when exercising power</heading><clause affected.by.uncommenced="0" guid="_606c6c7f-8e76-40eb-be47-87ee22d3a5d1" id="sec.775" provision.type="other" spent.amends="0"><no>775</no><heading guid="_92f2933a-f9a1-4e3f-ad8b-e135a60fbd70" id="sec.775-he">Application of <intref check="valid" refid="ch.10-pt.1-div.7" target.guid="_0b3435cf-ced0-468f-8bf0-a70848959ab6">div 7</intref></heading><subclause affected.by.uncommenced="0" guid="_29d0c1f7-92a3-4fa0-b7d7-6605e2d29ae4" id="sec.775-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This division applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_178d4351-bf78-4c83-a6ff-e2377bb04ed4" id="sec.775-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an inspector or authorised officer damages something when exercising, or purporting to exercise, a power; or</txt></block></li><li guid="_1e4d8513-0cb0-4093-b3d0-7dc768857421" id="sec.775-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a person helping an inspector or authorised officer to exercise, or purporting to exercise, the inspector’s or authorised officer’s powers damages something.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b3cc8003-1e9f-426d-822e-0d17cf0c57c5" id="sec.775-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, this division does not apply to damage the inspector or authorised officer reasonably considers is trivial or if the inspector or officer reasonably believes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d5056650-4f4b-417d-bcdb-d01cfb3f1d18" id="sec.775-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">there is no-one apparently in possession of the thing; or</txt></block></li><li guid="_94f0cab4-27e1-42e6-a9b7-6043e10c7e6f" id="sec.775-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the thing has been abandoned.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b7b86325-5376-4188-af13-988e1e8d7ec1" id="sec.776" provision.type="other" spent.amends="0"><no>776</no><heading guid="_3ad4cf29-5953-46e3-87c4-fac793659c80" id="sec.776-he">Requirement to give notice</heading><subclause affected.by.uncommenced="0" guid="_edb69398-976d-4efb-916e-6bc2bbff539b" id="sec.776-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The inspector or authorised officer must immediately give a notice of the damage to the person who appears to the inspector or officer to be the owner or person in possession or control of the thing.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_dc213493-5fea-42d3-b372-46220defc583" id="sec.776-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if for any reason it is not practicable to comply with <intref check="valid" refid="sec.776-ssec.1" target.guid="_edb69398-976d-4efb-916e-6bc2bbff539b">subsection (1)</intref>, the inspector or officer must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8c9bf6c7-2ce4-4f8c-96a7-6e3e56f22c96" id="sec.776-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">leave the notice at the place where the damage happened; and</txt></block></li><li guid="_f68cf30d-759d-4adc-b3b4-a5250b44232f" id="sec.776-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">ensure it is left in a conspicuous position and in a reasonably secure way.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8cb2fe4d-fccf-41c8-9b85-8a16785b9e3e" id="sec.776-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The inspector or officer may delay complying with <intref check="valid" refid="sec.776-ssec.1" target.guid="_edb69398-976d-4efb-916e-6bc2bbff539b">subsection (1)</intref> or <intref check="valid" refid="sec.776-ssec.2" target.guid="_dc213493-5fea-42d3-b372-46220defc583">(2)</intref> if the inspector or officer reasonably suspects complying with the subsection may frustrate or otherwise hinder an investigation by the inspector or officer.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8e0a9457-4310-4c48-9f1b-d927e29835e5" id="sec.776-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The delay may be only for so long as the inspector or officer continues to have the reasonable suspicion and remains in the vicinity of the place.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_68ed8170-0344-46f4-a46a-a09b15515ce3" id="sec.777" provision.type="other" spent.amends="0"><no>777</no><heading guid="_ef22de33-06b5-4d84-8b92-6363ae656868" id="sec.777-he">Content of notice</heading><subclause affected.by.uncommenced="0" guid="_e488f1fb-7b76-4946-a5fc-dde4ebecef7e" id="sec.777-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A notice of damage under <intref check="valid" refid="sec.776" target.guid="_b7b86325-5376-4188-af13-988e1e8d7ec1">section 776</intref> must state particulars of the damage.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_893f111d-ad4e-4bb1-b5b0-71dfadc1ed06" id="sec.777-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the inspector or authorised officer believes the damage was caused by a latent defect in the thing or circumstances beyond the control of the inspector or officer or a person helping the inspector or officer, the notice may state that belief.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_dffe6dff-8cb7-4897-8985-2d249b046bfc" id="ch.10-pt.1-div.8"><no>Division 8</no><heading guid="_4a2d086b-3d96-4a3e-8dd6-e59ffa21aab9" id="ch.10-pt.1-div.8-he">Miscellaneous provisions</heading><clause affected.by.uncommenced="0" guid="_040bedcf-250f-4ddc-8d38-e58ccf40a94e" id="sec.778" provision.type="other" spent.amends="0"><no>778</no><heading guid="_b1462a73-8768-4544-a053-fb7b4abc0a17" id="sec.778-he">Compensation for damage because of exercise of powers</heading><subclause affected.by.uncommenced="0" guid="_007deeed-397e-46b1-ba99-715563d18fad" id="sec.778-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person may claim compensation from the State if the person incurs a cost, damage or loss because of the exercise, or purported exercise, of a power under this part by or for an inspector or authorised officer.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_26699b7b-2049-4b2d-96ae-a8a128aa86f4" id="sec.778-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.778-ssec.1" target.guid="_007deeed-397e-46b1-ba99-715563d18fad">subsection (1)</intref>, compensation may be claimed for a cost, damage or loss incurred because of the compliance with a requirement made of the person under this part.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_01052fbe-71e8-40b9-bc28-1072566dc5a1" id="sec.778-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The compensation may be claimed and ordered in a proceeding—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c2ae9140-1ed4-4cdf-b601-82e6c2b2f289" id="sec.778-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">brought in a court of competent jurisdiction; or</txt></block></li><li guid="_be5eb39e-c755-404a-be3a-a6121e11911f" id="sec.778-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for an offence against this Act to which the claim relates.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ca6ef85d-55aa-44cd-8078-45376e7b85e6" id="sec.778-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A court may order the payment of compensation only if it is satisfied it is just to make the order in the circumstances of the particular case.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6e3fe985-98d2-461c-a630-9a60e1f2efa8" id="sec.778-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In considering whether it is just to order compensation, the court must have regard to any relevant offence committed by the claimant.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8fbaa792-d082-4606-996b-354b81e32ee8" id="sec.778-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">A regulation may prescribe other matters that may, or must, be taken into account by the court when considering whether it is just to order compensation.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1ab278b8-702c-4518-9446-0bf3dab0e4ec" id="sec.779" provision.type="other" spent.amends="0"><no>779</no><heading guid="_7335b424-f9f4-47c1-8f7f-b71ceb361e12" id="sec.779-he">Compliance with safety management system</heading><subclause affected.by.uncommenced="0" guid="_8fb3887c-0a87-4621-b2c1-adf0e0f8cb79" id="sec.779-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An inspector or authorised officer who exercises a power under this part in relation to an operating plant must comply with each relevant safety requirement under the safety management system for the plant.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_61724758-01b6-4c59-beb8-8289d7fbf5a2" id="sec.779-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref check="valid" refid="sec.779-ssec.1" target.guid="_8fb3887c-0a87-4621-b2c1-adf0e0f8cb79">Subsection (1)</intref> does not apply if the power is exercised with the chief inspector’s written approval.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3ff0957a-639c-479e-bb65-832f975193d7" id="sec.779-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A failure to comply with this <intref check="valid" refid="sec.779-ssec.1" target.guid="_8fb3887c-0a87-4621-b2c1-adf0e0f8cb79">subsection (1)</intref> does not invalidate or otherwise affect the exercise of the power.</txt></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_6e137e91-d3a4-4a20-aa14-8a85a8409334" id="ch.10-pt.2"><no>Part 2</no><heading guid="_b60e4270-1b9f-41c6-b2b5-c83112cf87f5" id="ch.10-pt.2-he">Directions and enforcement</heading><division affected.by.uncommenced="0" guid="_0d8fad72-dbf5-4496-a0c9-98ededdd4b83" id="ch.10-pt.2-div.1"><no>Division 1</no><heading guid="_69c3f314-46f7-44f8-8dcd-209dc6fe5b94" id="ch.10-pt.2-div.1-he">Direction to remedy contravention</heading><clause affected.by.uncommenced="0" guid="_9ab71ef6-c7f8-4004-81cd-446d1a349209" id="sec.780" provision.type="other" spent.amends="0"><no>780</no><heading guid="_e6436d21-e7b5-4356-b7b3-4bb5c06ad97f" id="sec.780-he">Power to give compliance direction</heading><subclause affected.by.uncommenced="0" guid="_53709b36-c0d2-4273-ad10-e089fa5036a3" id="sec.780-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if an inspector or authorised officer reasonably believes a person—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_792f419a-cbe7-4deb-96df-10da1de4be90" id="sec.780-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">has contravened, or is contravening, any of the following (an <defterm guid="_66313d0b-102f-41b1-ab3a-454d78479e03" id="sec.780-ssec.1-def.enforcedinstrument" type="definition">enforced instrument</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d9cc6c95-7bdf-414c-a254-e4ba4876eb44" id="sec.780-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">this Act;</txt></block></li><li guid="_ba32eb7e-913b-4c29-84d0-02cf4abb11f1" id="sec.780-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref>;</txt></block></li><li guid="_41772cb5-0aea-45bb-be60-aaadf36f278a" id="sec.780-ssec.1-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref>;</txt></block></li><li guid="_30d743bd-fac6-4789-a0ac-1f1e6fed0b0a" id="sec.780-ssec.1-para1.a-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">a mandatory provision of the land access code; or</txt></block></li></list></block></li><li guid="_50c9bc9c-5bf0-4303-86cb-356d96f2429f" id="sec.780-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is involved in an activity that is likely to result in a contravention of an enforced instrument.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9edc4374-8f11-4643-9009-1649becac890" id="sec.780-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The inspector or authorised officer may give the person a written direction (a <defterm guid="_6e0748f0-d3c4-4cac-8770-42b63695e95a" id="sec.780-def.compliancedirection" type="definition">compliance direction</defterm>) to take steps reasonably necessary to remedy the contravention or avoid the likely contravention.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d3e35505-451a-4554-a8a7-96c324e2ef95" id="sec.780-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The direction may also state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b7f0e603-abdc-4cdf-99e5-bf8331fa97be" id="sec.780-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the steps the inspector or authorised officer reasonably believes are necessary to remedy the contravention or avoid the likely contravention; or</txt></block></li><li guid="_b5c83642-70eb-4ef5-aba9-dfc9c5ab6750" id="sec.780-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that the person must notify the inspector or authorised officer when the person has complied with the compliance direction; or</txt></block></li><li guid="_bf46eb13-b615-4915-a9f7-1ce19eba951b" id="sec.780-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that an inspector or authorised officer proposes, at a stated time or at stated intervals, to enter premises of which the person is the occupier to check compliance with the direction.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f61d85a0-af9e-447c-ba16-96e6b77fecf4" id="sec.781" provision.type="other" spent.amends="0"><no>781</no><heading guid="_05ac6cc0-dae1-4b15-9904-5facccf7853c" id="sec.781-he">Requirements for giving compliance direction</heading><subclause affected.by.uncommenced="0" guid="_122b0ea6-f6c6-4c70-a289-69e1d89943b2" id="sec.781-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A compliance direction must state each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4450f693-e433-4fe5-883c-842940a8c340" id="sec.781-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that the inspector or authorised officer giving it believes the person given the direction—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dc3cae6a-8870-4632-a2ed-0a3cfa36844d" id="sec.781-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">has contravened, or is contravening, this Act, the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref> or the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref>; or</txt></block></li><li guid="_b928e50d-6e97-4065-b32b-868eaca6f632" id="sec.781-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">is involved in an activity that is likely to result in a contravention of this Act, the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref> or the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref>;</txt></block></li></list></block></li><li guid="_dba1ef2b-0371-4bed-ab93-4c911e85c5b5" id="sec.781-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the provision the inspector or authorised officer believes is being, has been, or is likely to be, contravened;</txt></block></li><li guid="_88634bee-0929-42f8-bc53-169032383fb5" id="sec.781-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the reasons for the belief;</txt></block></li><li guid="_3ce29865-4618-4fa0-b1b0-2b23e6f1b516" id="sec.781-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">that the person must take steps reasonably necessary to remedy the contravention, or avoid the likely contravention, within a stated reasonable period.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3712143e-fece-4b38-959e-4937fc90c311" id="sec.781-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The direction must include, or be accompanied by, an information notice about the decisions to give the direction and to fix the period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f137ad21-1c35-440e-a4aa-642889562c7b" id="sec.781-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The direction may be given orally if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_eaa3a3f5-6164-4d55-ab51-f7ba58345109" id="sec.781-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for any reason it is not practicable to give the direction in writing; and</txt></block></li><li guid="_f05f818f-ac4a-4e95-80dd-f566138d762a" id="sec.781-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the inspector or authorised officer giving it warns the person it is an offence not to comply with the direction.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c0a7bb29-7d62-4c1c-96de-d0db5c52418b" id="sec.781-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the direction is given orally, the inspector or authorised officer must confirm the direction by also giving it in writing as soon as practicable after giving it orally.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f7a791d5-519c-4f52-9806-903451ce372e" id="sec.782" provision.type="other" spent.amends="0"><no>782</no><heading guid="_6d7e6e56-6442-4857-b9e6-a9b8d406cf61" id="sec.782-he">Failure to comply with compliance direction</heading><subclause affected.by.uncommenced="0" guid="_cc603be6-4dc3-46e7-b686-b69e0959feec" id="sec.782-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person to whom a compliance direction has been given must comply with the direction unless the person has a reasonable excuse.</txt></block><penalty guid="_71167182-57f6-4b90-88bd-7e4d61a78bd4" id="sec.782-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty><note guid="_24dff90b-0f11-4aa0-8ebc-4582fcae5610" id="sec.782-ssec.1-note" type="example"><heading guid="_f79f4c6f-3eeb-47e3-9775-090eaeee4120" id="sec.782-ssec.1-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_75f96a53-b58a-4ff5-a754-1e34ceac4f98" id="sec.782-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the direction states steps the person may take to remedy the contravention, or avoid the likely contravention, the subject of the direction, the person is taken to have complied with the direction if all the steps have been taken.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_72df59a9-8225-49c4-807e-2713d79e5c54" id="sec.782-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0"><intref check="valid" refid="sec.782-ssec.2" target.guid="_75f96a53-b58a-4ff5-a754-1e34ceac4f98">Subsection (2)</intref> does not prevent the person from complying with the direction in another way.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_3f6c52e2-63ed-443a-b07e-91333f32b4e3" id="ch.10-pt.2-div.2"><no>Division 2</no><heading guid="_7767c5dd-f6a8-4075-8b00-e444c22fe941" id="ch.10-pt.2-div.2-he">Direction to remedy dangerous situation</heading><clause affected.by.uncommenced="0" guid="_219e4d39-b97d-4752-b46f-0061368a8c01" id="sec.783" provision.type="other" spent.amends="0"><no>783</no><heading guid="_943b7359-bfeb-4793-ab4f-2eeb3a207d7b" id="sec.783-he">Power to give dangerous situation direction</heading><subclause affected.by.uncommenced="0" guid="_06a2eaea-1623-45a3-92b6-e46b09308d04" id="sec.783-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if an inspector reasonably believes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1d361a9e-d30e-4936-8511-1880ca7cf74a" id="sec.783-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a dangerous situation exists; and</txt></block></li><li guid="_65f33748-067a-455e-83be-02d933275bc4" id="sec.783-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a person is in a position to take steps to prevent, remove or minimise the risk.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_df13a876-d6ea-4821-8d73-98549a36bda0" id="sec.783-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The inspector may give the person a written direction (a <defterm guid="_05a953cd-eac1-4eba-9f40-035e4f27c5c3" id="sec.783-def.dangeroussituationdirection" type="definition">dangerous situation direction</defterm>) to take steps reasonably necessary to prevent, remove or minimise the risk within a stated reasonable period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_640df43c-b08d-4447-a947-4bc10b1f221c" id="sec.783-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The direction may also state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8fb64e2c-146a-4010-9057-47258f01d96c" id="sec.783-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the steps the inspector reasonably believes are necessary to prevent, remove or minimise the risk; or</txt></block></li><li guid="_304d5bb4-4aa6-4641-bfe2-8f7df853a195" id="sec.783-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that the person must notify the inspector or authorised officer when the person has complied with the dangerous situation direction; or</txt></block></li><li guid="_33886e2d-3851-413d-a1e5-fbaad3bfca3d" id="sec.783-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that an inspector or an authorised officer proposes, at a stated time or at stated intervals, to enter premises of which the person is the occupier to check compliance with the direction.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_bd4595df-2118-46de-a152-a08b4a252b0b" id="sec.784" provision.type="other" spent.amends="0"><no>784</no><heading guid="_5b2f1b56-0cd0-4736-90bf-1271cdcda232" id="sec.784-he">Requirements for giving dangerous situation direction</heading><subclause affected.by.uncommenced="0" guid="_4732f2f5-7d63-4580-94c3-8fb0a79d601d" id="sec.784-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A dangerous situation direction must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_94e0d4a2-dfd8-496c-b909-bde4d465ff48" id="sec.784-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that the inspector giving the direction believes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_63d6ed0e-ea08-4591-a6da-18c1dcf8ab4a" id="sec.784-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a stated dangerous situation exists; and</txt></block></li><li guid="_04466599-bffd-427e-896f-890fc3d1c57e" id="sec.784-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the person given the direction is in a position to take steps to prevent, remove or minimise the risk; and</txt></block></li></list></block></li><li guid="_56acafe6-33d8-4d32-aaea-3cf2f03490e2" id="sec.784-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the reasons for the belief; and</txt></block></li><li guid="_ea3a0c76-2a7e-486a-90a6-1eab31ec4a35" id="sec.784-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that the person must take steps reasonably necessary to prevent, remove or minimise the risk within a stated reasonable period.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_963a062c-e392-47a7-a2db-761f489e9c13" id="sec.784-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The direction must include, or be accompanied by, an information notice about the decisions to give the direction and to fix the period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_cd8f3eeb-e5d2-434a-88fa-79bf6f2726f8" id="sec.784-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The direction may be given orally if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3b24ce4e-5275-452c-9c78-15bbed51fb1d" id="sec.784-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for any reason it is not practicable to give the direction in writing; and</txt></block></li><li guid="_625ad384-b447-4b6b-8331-05c0673834f9" id="sec.784-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the inspector warns the person it is an offence not to comply with the direction.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_598910d8-2d61-4899-81ac-f13d54cde8e2" id="sec.784-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If a dangerous situation direction is given orally, the inspector who gave it must confirm the direction by also giving it in writing as soon as practicable after giving it orally.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_bcc62bf7-4b55-4d84-ad97-eed1c7a46e4c" id="sec.785" provision.type="other" spent.amends="0"><no>785</no><heading guid="_b41f96ce-11f0-475f-a218-4f092277f7f4" id="sec.785-he">Failure to comply with dangerous situation direction</heading><block><txt break.before="1">A person to whom a dangerous situation direction has been given must comply with the direction.</txt></block><penalty guid="_9f77f4fa-3b2d-4ef6-a243-ff8b3d5fa561" id="sec.785-pen"><block><txt break.before="1">Maximum penalty—1,000 penalty units.</txt></block></penalty><note guid="_7ec4e2c7-3675-491f-8e76-28c7bba422b6" id="sec.785-note" type="example"><heading guid="_71b207d0-18a6-4d73-81f5-cf4fa373d0ae" id="sec.785-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></clause></division><division affected.by.uncommenced="0" guid="_1c92b3d7-09f6-41d1-94a9-823db3650873" id="ch.10-pt.2-div.3"><no>Division 3</no><heading guid="_5a93d6bd-42c3-47a3-97a4-599bd0ff5b30" id="ch.10-pt.2-div.3-he">Enforcement of directions</heading><clause affected.by.uncommenced="0" guid="_00d16860-98f5-40ce-8c72-ee2c9b102218" id="sec.786" provision.type="other" spent.amends="0"><no>786</no><heading guid="_b41fdd2b-14e6-4723-9e84-d34ed5ebf581" id="sec.786-he">Reinspection or re-attendance to check compliance</heading><subclause affected.by.uncommenced="0" guid="_55c50e4d-bf15-4cce-a099-103675c0e970" id="sec.786-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a compliance or dangerous situation direction has been given, an inspector or authorised officer may, if the inspector or officer considers it reasonably necessary, carry out a reinspection or re-attendance to check compliance with the direction.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4f90548e-bf80-45b5-82f6-f35c0cc065bd" id="sec.786-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The reinspection or re-attendance must be carried out at a reasonable time.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_dc725fb8-a241-4f70-99b2-7c22e6476b9f" id="sec.787" provision.type="other" spent.amends="0"><no>787</no><heading guid="_62a007ab-8e19-4f4e-8b07-8e886a4bef7a" id="sec.787-he">Action to ensure compliance</heading><block><txt break.before="1">If a person to whom a compliance or dangerous situation direction has been given does not comply with the direction, an inspector or authorised officer may take necessary and reasonable action to ensure the direction is complied with.</txt></block></clause><clause affected.by.uncommenced="0" guid="_f172b83b-9885-405a-9ee7-9eac137db0ce" id="sec.788" provision.type="other" spent.amends="0"><no>788</no><heading guid="_c29f4aa0-8fa0-49ba-95bd-a89042ac5e1a" id="sec.788-he">Recovery of enforcement costs</heading><subclause affected.by.uncommenced="0" guid="_72e45819-72f3-41d7-860b-78c0a20bee12" id="sec.788-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The State may recover from the responsible person as a debt any reasonable costs incurred in—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8094c572-d966-4405-9dd6-8961dc94b11b" id="sec.788-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">carrying out a re-attendance under <intref check="valid" refid="sec.786" target.guid="_00d16860-98f5-40ce-8c72-ee2c9b102218">section 786</intref>; or</txt></block></li><li guid="_e136a68f-6816-4127-a9db-bcb0c14d397a" id="sec.788-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">taking action under <intref check="valid" refid="sec.787" target.guid="_dc725fb8-a241-4f70-99b2-7c22e6476b9f">section 787</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b4b5f9a2-abdb-4f5e-ab62-e3ba2908cb60" id="sec.788-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_4dde18b6-20fb-438e-8ad5-90c790cf0e14" id="sec.788-ssec.2-def.responsibleperson_"><txt break.before="1"><defterm guid="_88f7a754-e1cb-4938-b797-73e3573555c1" id="sec.788-ssec.2-def.responsibleperson" type="definition">responsible person</defterm> means the person to whom the relevant direction was given.</txt></definition></deflist></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_93565a11-d5fa-40f7-b2e9-a1e50fa978e7" id="ch.10-pt.2-div.4"><no>Division 4</no><heading guid="_f70626e6-92e2-45aa-acc6-346f279c8760" id="ch.10-pt.2-div.4-he">Noncompliance procedure for all authorities under Act</heading><subdivision affected.by.uncommenced="0" guid="_e5c5e062-f3bc-4bbc-b748-465c7467da6a" id="ch.10-pt.2-div.4-sdiv.1"><no>Subdivision 1</no><heading guid="_2fc46814-d9a7-4914-afaa-c0a168eddb75" id="ch.10-pt.2-div.4-sdiv.1-he">Introduction</heading><clause affected.by.uncommenced="0" guid="_2fe50a1d-bf5d-491a-9f1f-faadeda6c229" id="sec.789" provision.type="other" spent.amends="0"><no>789</no><heading guid="_f26ac8df-046a-4ff0-a578-ee874009509a" id="sec.789-he">Operation of <intref check="valid" refid="ch.10-pt.2-div.4" target.guid="_93565a11-d5fa-40f7-b2e9-a1e50fa978e7">div 4</intref></heading><subclause affected.by.uncommenced="0" guid="_f6419ce8-4bf2-4218-bd19-17dca9bc9f21" id="sec.789-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This division provides a process for noncompliance action against the holder of any authority under this Act mentioned in <intref check="valid" refid="sec.18" target.guid="_00606342-13a2-49f5-a337-6c1f809e1f2e">section 18</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b8e13cd9-320f-4a4e-9e6b-54567b5fdd08" id="sec.789-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The <defterm guid="_c782b799-4b1d-43dc-ae6b-a6ae5803d823" id="sec.789-def.relevantofficial" type="definition">relevant official</defterm> for taking the action is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2206f290-2edc-4617-a2b0-c27f59cbc3e1" id="sec.789-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for a petroleum authority—the Minister; or</txt></block></li><li guid="_e9a83630-5f70-48ad-9cc9-be9005fdff15" id="sec.789-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for a gas work licence<ins xml:space="preserve">, gas work authorisation</ins> or <del xml:space="preserve">authorisation</del><ins xml:space="preserve">gas device approval authority</ins>—the chief inspector.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1ce6f0a7-e16c-4912-9f97-79abfdc0086b" id="sec.789-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The power to take noncompliance action under this division does not limit a power as follows (the <defterm guid="_eee8d2d3-8e9f-4aa3-8b2b-07562efa183c" id="sec.789-def.otherpower" type="definition">other power</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5f7a6a3f-3aef-4b9e-9c18-9ca8301a83f0" id="sec.789-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the power under <intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref>, <intref check="valid" refid="ch.5-pt.1" target.guid="_c3970261-835e-46b9-a81f-2585d91d1738">part 1</intref> to require new or additional security;</txt></block></li><li guid="_359d3ec4-98b0-4ab6-8e77-a159ffc888ac" id="sec.789-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a power under another provision of this Act to amend the authority;</txt></block></li><li guid="_6d71cf44-cc01-4a42-aa94-2c61a384eb5f" id="sec.789-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the power to give a dangerous situation or compliance direction.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f7b8423d-ea06-479f-8b47-9e32ca120bc6" id="sec.789-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The other power does not limit the power to take noncompliance action.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8af8df4c-3d7a-4e7d-aa5a-816ca5d6222c" id="sec.789-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Noncompliance action may be taken at the same time as the other power is exercised.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_50ecf8a6-1d16-4fdc-b6f9-436fe4ef2739" id="ch.10-pt.2-div.4-sdiv.2"><no>Subdivision 2</no><heading guid="_7020aeb4-2965-4a54-8067-dea5aa89ab2d" id="ch.10-pt.2-div.4-sdiv.2-he">Noncompliance action</heading><clause affected.by.uncommenced="0" guid="_0ae40873-0f6d-4440-a74c-a02fa5649d4f" id="sec.790" provision.type="other" spent.amends="0"><no>790</no><heading guid="_a1a6a6fd-cdad-4490-a4b9-f89277cdbb30" id="sec.790-he">Types of noncompliance action that may be taken</heading><subclause affected.by.uncommenced="0" guid="_e5b16464-3b1b-49f2-9d8e-3b9d7c76d4ad" id="sec.790-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The noncompliance action the relevant official may take under this division is all or any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cd8a1376-73e9-411c-86af-76c708bb2c6b" id="sec.790-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">amending the authority by doing all or any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a75d64a6-a938-4ce5-a249-04558f2a819f" id="sec.790-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">reducing the term of the authority;</txt></block></li><li guid="_99236287-16dc-4c05-97d4-be2f166fefa1" id="sec.790-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">for a petroleum authority—reducing its area;</txt><note guid="_e631a505-2246-4316-85fe-0241e3990660" id="sec.790-ssec.1-para1.a-para2.ii-note" type="example"><heading guid="_d2214857-db04-45b1-ad31-6f28e9ba2af8" id="sec.790-ssec.1-para1.a-para2.ii-note-he">Example of a possible reduction—</heading><block><txt break.before="1">An authority to prospect holder has not, in contravention of <intref check="valid" refid="sec.78" target.guid="_2b68729d-6709-4fae-a178-9da314d26458">section 78</intref>, carried out work required under the work program for the authority. Noncompliance action may include amending the authority to reduce its area to reflect the work not carried out.</txt></block></note></block></li><li guid="_5872bc45-8318-4f4b-b10a-2d7109342088" id="sec.790-ssec.1-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">amending a condition of the authority;</txt></block></li><li guid="_0c07f8a7-e783-4819-9abc-33a37129e068" id="sec.790-ssec.1-para1.a-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">imposing a new condition;</txt></block></li></list></block></li><li guid="_be540110-8922-4c58-9559-fa56156b036c" id="sec.790-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">requiring the authority holder to relinquish a stated part of the area of the authority on or before a stated time;</txt></block></li><li guid="_c1fb6ad7-98c7-4cf5-9517-089ce412667a" id="sec.790-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">cancelling the authority, immediately or on a stated day;</txt></block></li><li guid="_cef7f21a-eee3-413c-8ba2-2aa711f8b11c" id="sec.790-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">if the authority is a gas work licence or authorisation—suspending it for a period, either under <intref check="valid" refid="ch.10-pt.2-div.4-sdiv.3" target.guid="_e855054d-1c85-40b5-a750-60dffd4eb708">subdivision 3</intref> or by a notice under <intref check="valid" refid="ch.10-pt.2-div.4-sdiv.4" target.guid="_d0a5dbbc-b774-4448-a8eb-3b1d552fae45">subdivision 4</intref>;</txt></block></li><li change="ins" guid="_0d04185e-a774-4c41-806d-40dbcac12411" id="sec.790-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">if the authority is a gas device approval authority—suspending it for a period by a notice under subdivision 4;</txt></block></li><li change="renumber" guid="_af281e31-258c-4e3f-b6b8-0934ce83c177" id="sec.790-ssec.1-para1.f" provision.type="other"><no>(<del xml:space="preserve">e</del><ins xml:space="preserve">f</ins>)</no><block><txt break.before="0">if the authority is a petroleum tenure—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dc006f2a-98ed-4fe0-ac62-5dac3b821d00" id="sec.790-ssec.1-para1.f-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">withdrawing, from a stated day, the approval of its work program or development plan; and</txt><note guid="_acc8ab7a-5007-41c6-a69e-92666b943a38" id="sec.790-ssec.1-para1.f-para2.i-note" type="example"><heading guid="_63f0d914-51fe-4c25-8ae2-91c55b8214ab" id="sec.790-ssec.1-para1.f-para2.i-note-he">Note—</heading><block><txt break.before="1">See <intref check="valid" refid="sec.796" target.guid="_056af193-6d77-4333-8bb5-bfc1efd7a79f">section 796</intref> (Notice of proposed noncompliance action other than immediate suspension).</txt></block></note></block></li><li guid="_43c385d1-5d90-4d32-8ba0-57d73efbd723" id="sec.790-ssec.1-para1.f-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">directing its holder to, on or before that day, lodge the following program or plan so that the Minister may decide whether to approve the program or plan—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8d45640b-dbf7-4d3c-bb68-59e63899888d" id="sec.790-ssec.1-para1.f-para2.ii-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">for an authority to prospect—a proposed later work program that complies with the later work program requirements;</txt></block></li><li guid="_6943aa97-7d66-4da2-abf4-519c47e1bb56" id="sec.790-ssec.1-para1.f-para2.ii-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">for a petroleum lease—a proposed later development plan that complies with the later development plan requirements;</txt></block></li></list></block></li></list></block></li><li change="renumber" guid="_14effe77-9394-4d34-80ef-fa863f756ca1" id="sec.790-ssec.1-para1.g" provision.type="other"><no>(<del xml:space="preserve">f</del><ins xml:space="preserve">g</ins>)</no><block><txt break.before="0">requiring the authority holder to pay the State a penalty of an amount no more than the monetary value of 2,000 penalty units.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7ad03061-fe18-445a-9c62-495fb212ab04" id="sec.790-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, a requirement under subsection (1)(<del xml:space="preserve"><intref check="valid" refid="sec.790-ssec.1-para1.f" target.guid="_14effe77-9394-4d34-80ef-fa863f756ca1">f)—</intref></del><ins xml:space="preserve">g)—</ins></txt><list number.type="manual" unnumbered.indent="0"><li guid="_361957ae-7cb8-420e-a58a-11bbd4b0739a" id="sec.790-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">may not be made if the event for which the noncompliance action is taken is an event mentioned in <intref check="valid" refid="sec.791" target.guid="_5e225dd2-34bd-446a-89c2-ce6d21a7530b">section 791</intref><intref check="valid" refid="sec.791-ssec.2" target.guid="_26963a38-a6a0-422d-89cf-3a499626d085">(2)</intref><intref check="valid" refid="sec.791-ssec.2-para1.g" target.guid="_04a66d22-6739-4397-b913-1fc887559733">(g)</intref>; and</txt></block></li><li guid="_ba51dd2c-d316-4ec3-b77c-f1705a443402" id="sec.790-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">may be made only if the holder has agreed to the requirement being made instead of the taking of other noncompliance action under <intref check="valid" refid="sec.790-ssec.1" target.guid="_e5b16464-3b1b-49f2-9d8e-3b9d7c76d4ad">subsection (1)</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_630ac6b8-5273-4050-a8a9-2037f532c5d3" id="sec.790-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A condition or amendment under <intref check="valid" refid="sec.790-ssec.1" target.guid="_e5b16464-3b1b-49f2-9d8e-3b9d7c76d4ad">subsection (1)</intref> may restrict the authorised activities for the authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ed5b46f9-0db2-473b-8b5d-ca6c8c7bee55" id="sec.790-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If, under <intref check="valid" refid="sec.790-ssec.1" target.guid="_e5b16464-3b1b-49f2-9d8e-3b9d7c76d4ad">subsection (1)</intref><intref check="valid" refid="sec.790-ssec.1-para1.c" target.guid="_c1fb6ad7-98c7-4cf5-9517-089ce412667a">(c)</intref>, the authority is cancelled on a stated day, a condition may be imposed under <intref check="valid" refid="sec.790-ssec.1" target.guid="_e5b16464-3b1b-49f2-9d8e-3b9d7c76d4ad">subsection (1)</intref><intref check="valid" refid="sec.790-ssec.1-para1.a" target.guid="_cd8a1376-73e9-411c-86af-76c708bb2c6b">(a)</intref> restricting the authorised activities for the authority until the cancellation.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9802f2b8-5e03-43e1-84b8-39e79f42ca20" id="sec.790-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Noncompliance action may be taken despite the mandatory conditions for the authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d633dc51-02f3-4858-b4d2-d4230787ae10" id="sec.790-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The power under <intref check="valid" refid="sec.790-ssec.1" target.guid="_e5b16464-3b1b-49f2-9d8e-3b9d7c76d4ad">subsection (1)</intref> to amend a gas work licence or authorisation may be exercised even if it is suspended.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_5e225dd2-34bd-446a-89c2-ce6d21a7530b" id="sec.791" provision.type="other" spent.amends="0"><no>791</no><heading guid="_48571521-b387-4381-a0fa-7d75ceca5cd5" id="sec.791-he">When noncompliance action may be taken</heading><subclause affected.by.uncommenced="0" guid="_a82f3c1a-c8ac-4173-9452-bd6890a4ecad" id="sec.791-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Noncompliance action may be taken if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d960fdbd-8b8d-44fe-9572-3d6e2069059f" id="sec.791-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an event mentioned in <intref check="valid" refid="sec.791-ssec.2" target.guid="_26963a38-a6a0-422d-89cf-3a499626d085">subsection (2)</intref> or <intref check="valid" refid="sec.791-ssec.3" target.guid="_a5f5e020-7d76-49ae-9eeb-40b328479a9e">(3)</intref> has happened; and</txt></block></li><li guid="_98fbc6d8-b380-4f49-a3fc-1b88404e1527" id="sec.791-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the procedure under <intref check="valid" refid="ch.10-pt.2-div.4-sdiv.3" target.guid="_e855054d-1c85-40b5-a750-60dffd4eb708">subdivision 3</intref> or <intref check="valid" refid="ch.10-pt.2-div.4-sdiv.4" target.guid="_d0a5dbbc-b774-4448-a8eb-3b1d552fae45">4</intref> for taking the action has been followed; and</txt></block></li><li guid="_0ac3e42c-08b0-441b-a3bf-2712f77cc0f2" id="sec.791-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the authority for which the noncompliance action is taken relates to the event for which the action is taken.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_26963a38-a6a0-422d-89cf-3a499626d085" id="sec.791-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.791-ssec.1" target.guid="_a82f3c1a-c8ac-4173-9452-bd6890a4ecad">subsection (1)</intref>, the event is that the holder—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2b0898f1-6242-4f6f-8c17-f7d0b5493392" id="sec.791-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">obtained the authority because of a materially false or misleading representation or declaration, made orally or in writing; or</txt></block></li><li guid="_a8f3e7fd-226b-4962-83e0-388d04880c2b" id="sec.791-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">has failed to comply with this Act, a direction given under this Act or the authority; or</txt></block></li><li guid="_68f8170b-4039-4862-ac55-2a61fa9f8b4c" id="sec.791-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">did not pay an amount under this Act by the day it became owing; or</txt></block></li><li guid="_094cc875-f4b3-49d3-be8f-f737aee01a9e" id="sec.791-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">has used any land in the area of the authority for an activity that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4e0a24bc-324b-4ac2-a5da-7a6a7c2c760d" id="sec.791-ssec.2-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">is not an authorised activity for the authority or that, under any of the following, can not be carried out on the land—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b4c926f1-e87c-48fd-89dd-3513902672c4" id="sec.791-ssec.2-para1.d-para2.i-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.5" target.doc.id="act-2010-031" target.guid="_18ab3134-f9ef-4b7d-a156-de3b91cceaa3" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act">chapter 5</legref>;</txt></block></li><li guid="_93bef660-c6f2-49cc-bab9-832cb84e8f3e" id="sec.791-ssec.2-para1.d-para2.i-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.4" target.doc.id="act-2009-003" target.guid="_faefc638-342e-43b0-a5ed-6ae7a9f9a690" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act">chapter 4</legref>;</txt></block></li><li guid="_3b24faac-2bc2-4339-9624-736e4f0c5c0c" id="sec.791-ssec.2-para1.d-para2.i-para3.C" provision.type="other"><no>(C)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.3A" target.doc.id="act-1989-110" target.guid="_92b7d86f-dc1d-45cc-834b-b9a571e716d2" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 3A</legref> or <legref check="valid" jurisd="QLD" refid="ch.9" target.doc.id="act-1989-110" target.guid="_644f1d86-4673-4637-b599-a90421be58d4" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">chapter 9</legref>; and</txt></block></li></list></block></li><li guid="_92a41402-72df-4e40-8688-cdd73fe8b40d" id="sec.791-ssec.2-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the holder can not otherwise lawfully carry out; or</txt></block></li></list></block></li><li guid="_f29996b3-ce18-468a-9e3b-b005b739b17f" id="sec.791-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">has used the authority for a purpose other than for a purpose for which it was granted; or</txt></block></li><li guid="_e4ae0ed4-fc5f-4bea-adeb-b36732b2da4b" id="sec.791-ssec.2-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">has carried out, or purported to carry out, work under the authority for which the authority was not granted; or</txt></block></li><li guid="_04a66d22-6739-4397-b913-1fc887559733" id="sec.791-ssec.2-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">is the subject of a notice given to the Minister by the chief executive of the department administering the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref>, stating that the holder has been convicted of an offence against the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-2000-034" target.guid="_925a85c9-88dd-4ce0-a3a5-2154f5bf8586" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act">chapter 3</legref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a5f5e020-7d76-49ae-9eeb-40b328479a9e" id="sec.791-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, if the authority is a petroleum authority, it is an event for <intref check="valid" refid="sec.791-ssec.1" target.guid="_a82f3c1a-c8ac-4173-9452-bd6890a4ecad">subsection (1)</intref> if the holder is not, or has ceased to be, an eligible person.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_edda888c-32e2-4766-aa77-c71b8cc8d351" id="sec.792" provision.type="other" spent.amends="0"><no>792</no><heading guid="_05a78cdb-e04b-4aaf-9957-997ab02904c4" id="sec.792-he">Provision for divided petroleum tenures</heading><subclause affected.by.uncommenced="0" guid="_bd21e73c-04c1-4f90-b956-d46c58d0673d" id="sec.792-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If, under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, a petroleum tenure (the <defterm guid="_e0db8d98-d2d1-4eaf-b31e-93659b7ac062" id="sec.792-def.originaltenure" type="definition">original tenure</defterm>) is divided into other petroleum tenures (the <defterm guid="_c666f25e-f87d-49c8-bea5-19a62209d670" id="sec.792-def.newtenures" type="definition">new tenures</defterm>), any noncompliance action started, or that could have been taken, against the original tenure holder may be continued or started against any holder of any of the new tenures.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7a5ae7d9-73b0-4282-885e-a88f95933b59" id="sec.792-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the procedure under <intref check="valid" refid="ch.10-pt.2-div.4-sdiv.4" target.guid="_d0a5dbbc-b774-4448-a8eb-3b1d552fae45">subdivision 4</intref> for taking the noncompliance action must be followed.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_e855054d-1c85-40b5-a750-60dffd4eb708" id="ch.10-pt.2-div.4-sdiv.3"><no>Subdivision 3</no><heading guid="_df116428-9b1e-4cbb-9e15-3a049ff769c1" id="ch.10-pt.2-div.4-sdiv.3-he">Procedure for immediate suspension of gas work licence or authorisation</heading><clause affected.by.uncommenced="0" guid="_0d61b58e-685a-4b47-ac5a-c03a18bf2a95" id="sec.793" provision.type="other" spent.amends="0"><no>793</no><heading guid="_bc206b2b-5983-4891-ac17-777ffc724150" id="sec.793-he">Application of <intref check="valid" refid="ch.10-pt.2-div.4-sdiv.3" target.guid="_e855054d-1c85-40b5-a750-60dffd4eb708">sdiv 3</intref></heading><block><txt break.before="1">This subdivision applies only if the authority is a gas work licence or authorisation.</txt></block></clause><clause affected.by.uncommenced="0" guid="_df6251cb-b883-4f8c-a53a-f9989790f40f" id="sec.794" provision.type="other" spent.amends="0"><no>794</no><heading guid="_02157890-346f-4d03-956c-54ebc3db3939" id="sec.794-he">Immediate suspension</heading><subclause affected.by.uncommenced="0" guid="_8a8c6c45-d12a-47ca-8d1d-12170339e704" id="sec.794-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief inspector may, by a notice (a <defterm guid="_e8118caa-8972-4664-902c-c8f6c020e5c7" id="sec.794-def.suspensionnotice" type="definition">suspension notice</defterm>) to the holder, immediately suspend the authority if the chief inspector reasonably believes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4abb0f65-8368-4ca3-8da6-5ca6158c539a" id="sec.794-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a ground exists to suspend or cancel the authority; and</txt></block></li><li guid="_78edb345-30fe-4456-bb6f-bb810b8fd151" id="sec.794-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">it is imperative to immediately suspend the authority to control or prevent a danger to the public.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3222cf04-57b7-4b84-b41e-68c47e77ba9d" id="sec.794-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The suspension notice must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4349ce86-2283-488b-a4ee-e6b2f5ce1efa" id="sec.794-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">state each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_95f0641a-3e0c-4d5e-84db-fc8d5563ba4b" id="sec.794-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">that the authority is suspended immediately;</txt></block></li><li guid="_3c10d8ca-aa50-4c43-b1fc-c8fbd4fe5bb7" id="sec.794-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the grounds for the suspension;</txt></block></li><li guid="_dea15bba-907f-4829-a334-b9ff81511e0b" id="sec.794-ssec.2-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the facts and circumstances forming the basis for the grounds;</txt></block></li><li guid="_6323972a-a770-4755-a1d8-283163b4978a" id="sec.794-ssec.2-para1.a-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">the suspension period;</txt></block></li><li guid="_4496341d-3f11-4d61-9458-bcd624e55ac0" id="sec.794-ssec.2-para1.a-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">that the holder may lodge submissions, to show why the suspension should end; and</txt></block></li></list></block></li><li guid="_2ec28c4d-4758-4271-8bb2-65ee023b2067" id="sec.794-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">include, or be accompanied by, a notice about the decisions to give the notice and to fix the suspension period.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6f77fd7d-7c92-4bec-8383-422f39b6dd6a" id="sec.794-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The suspension period ends—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_002b2848-e44a-43ba-8183-72cae19de359" id="sec.794-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the chief inspector takes a noncompliance action in relation to the authority under <intref check="valid" refid="sec.798" target.guid="_d952a7cf-6ddd-4060-b1eb-ef616256bd4d">section 798</intref>—when the noncompliance action is finally disposed of; or</txt></block></li><li guid="_7c5aa374-c673-4647-ae63-e48f55d884f0" id="sec.794-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—within the period stated in the suspension notice that is not more than 40 business days.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f75edbfb-0092-4e85-a6b5-a79bcef7a179" id="sec.794-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The suspension has effect immediately after the holder is given the suspension notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fe7a6c64-a3eb-40a1-a96a-514aff87001b" id="sec.794-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The authority is ineffective during the suspension period.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_d0a5dbbc-b774-4448-a8eb-3b1d552fae45" id="ch.10-pt.2-div.4-sdiv.4"><no>Subdivision 4</no><heading guid="_10f23bb2-5845-418c-af85-ff667357fa46" id="ch.10-pt.2-div.4-sdiv.4-he">Procedure for other noncompliance action</heading><clause affected.by.uncommenced="0" guid="_3dab70e4-6984-415f-add5-13ded020d2d5" id="sec.795" provision.type="other" spent.amends="0"><no>795</no><heading guid="_b4e4b2c2-45c2-4511-8a99-510bfda8a465" id="sec.795-he">Application of <intref check="valid" refid="ch.10-pt.2-div.4-sdiv.4" target.guid="_d0a5dbbc-b774-4448-a8eb-3b1d552fae45">sdiv 4</intref></heading><block><txt break.before="1">This subdivision applies if the relevant official proposes to take noncompliance action, other than immediate suspension under <intref check="valid" refid="sec.794" target.guid="_df6251cb-b883-4f8c-a53a-f9989790f40f">section 794</intref>.</txt></block></clause><clause affected.by.uncommenced="0" guid="_056af193-6d77-4333-8bb5-bfc1efd7a79f" id="sec.796" provision.type="other" spent.amends="0"><no>796</no><heading guid="_b8a4b72e-e255-4090-8246-27d015794cb1" id="sec.796-he">Notice of proposed noncompliance action other than immediate suspension</heading><subclause affected.by.uncommenced="0" guid="_d6709571-8d3c-4b3b-b09b-e526c05e2dfb" id="sec.796-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The relevant official must give the authority holder a notice stating each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_63332a3a-7c1d-48ef-9c2b-b4098597528a" id="sec.796-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that the relevant official proposes to take noncompliance action against the holder;</txt></block></li><li guid="_7f11a567-2cf7-4e5d-a6e1-5fc4e1c8b212" id="sec.796-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the types of noncompliance action that may be taken against the holder and the type likely to be taken;</txt></block></li><li guid="_20a2f8d1-5da7-470b-a0b0-f88614128363" id="sec.796-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the grounds for taking noncompliance action against the holder;</txt></block></li><li guid="_ecb5702f-4ba2-4742-be3c-44cd591cd316" id="sec.796-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the facts and circumstances that are the basis for the grounds;</txt></block></li><li guid="_eea04805-a246-4bf2-8023-34bec4bdb914" id="sec.796-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">that the holder may, within a stated period, lodge submissions about the proposal to take noncompliance action.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_98e80dd1-5459-45ac-abfd-32fc4e177011" id="sec.796-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice may state any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0f68ff8a-6548-442e-9494-f307a0cca287" id="sec.796-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the noncompliance action is likely to include amending the authority—the likely amendment;</txt></block></li><li guid="_3eb21c7b-0b28-4c9e-b46c-4d04a6e04853" id="sec.796-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the authority is a petroleum authority—the amount of any likely reduction of the area of the authority;</txt></block></li><li guid="_18677aa0-328c-4297-8f69-d620fd7d9e00" id="sec.796-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the proposed noncompliance action is to suspend the authority—the likely suspension period.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_53c5d11a-68e1-48eb-8639-d060e3709019" id="sec.796-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A suspension period may be fixed by reference to a stated event.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_074d6cd5-9484-416e-86de-3488173e04cc" id="sec.796-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The stated period must be at least 20 business days after the holder is given the notice.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b0271ed8-6b45-48c2-86f9-81cc9284c8df" id="sec.797" provision.type="other" spent.amends="0"><no>797</no><heading guid="_bbd544ba-9723-4c48-a2b0-058908db3342" id="sec.797-he">Considering submissions</heading><subclause affected.by.uncommenced="0" guid="_6b1e2bef-e2ba-42c1-b590-23308032dd16" id="sec.797-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The relevant official must consider any submissions lodged by the holder, during the period stated in the notice given under <intref check="valid" refid="sec.796" target.guid="_056af193-6d77-4333-8bb5-bfc1efd7a79f">section 796</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bb4bfcf6-3c1c-4497-b7bb-ad3c5b3049f7" id="sec.797-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the relevant official decides not to take noncompliance action the relevant official must promptly give the holder a notice of the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d952a7cf-6ddd-4060-b1eb-ef616256bd4d" id="sec.798" provision.type="other" spent.amends="0"><no>798</no><heading guid="_c6df2ff7-626e-4b3c-949a-b42c27e2cbb9" id="sec.798-he">Decision on proposed noncompliance action</heading><subclause affected.by.uncommenced="0" guid="_6f7b63d2-42d2-4e84-a067-b1cd467743a1" id="sec.798-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If, after complying with <intref check="valid" refid="sec.797" target.guid="_b0271ed8-6b45-48c2-86f9-81cc9284c8df">section 797</intref>, the relevant official still believes a ground exists to take noncompliance action, the official may decide to take noncompliance action in relation to the authority that relates to a ground stated in the notice given under <intref check="valid" refid="sec.796" target.guid="_056af193-6d77-4333-8bb5-bfc1efd7a79f">section 796</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a81f9627-3eba-4444-a8b8-f8693fce65f4" id="sec.798-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The relevant official must, in deciding whether to take the action, have regard to whether the holder is a suitable person to hold, or continue to hold, the authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_384b1aa7-9120-4e1d-88e5-22671887dbb0" id="sec.798-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In considering whether the holder is a suitable person to hold, or to continue to hold, the authority the relevant official must consider any criteria that apply in deciding whether to grant an authority of the same type.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_363fac12-4846-415f-bd3f-d4c69644de25" id="sec.799" provision.type="other" spent.amends="0"><no>799</no><heading guid="_27cf30df-6b0f-4aa3-81df-eb42a96acf54" id="sec.799-he">Notice and taking effect of decision</heading><subclause affected.by.uncommenced="0" guid="_e5e9af16-f0cd-4784-947d-bfb1a11c6e0a" id="sec.799-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the relevant official makes a decision under <intref check="valid" refid="sec.798" target.guid="_d952a7cf-6ddd-4060-b1eb-ef616256bd4d">section 798</intref>, the person must after making the decision give an information notice about the decision to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3c3b148b-5012-44f8-993e-4034e021108b" id="sec.799-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the holder; and</txt></block></li><li guid="_7c1d098d-9e2e-44fb-b694-34221dd893f1" id="sec.799-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for a petroleum authority—any other person who holds an interest in the authority recorded in the register.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ee4ac2ae-aec2-45ac-a879-2fa6d2687520" id="sec.799-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Generally, the decision takes effect on the later of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8cf54897-560c-4f35-a049-74e497d8411d" id="sec.799-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the day the holder is given the information notice;</txt></block></li><li guid="_20b6132d-a012-4c81-ab59-45176db1aeaf" id="sec.799-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a later day of effect stated in the notice.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f60a6c71-4492-4cbc-9ee6-784812fa5fe2" id="sec.799-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, if the decision was to cancel or suspend the authority, the decision does not take effect until the end of the appeal period for the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_36cbe51f-acca-420e-b102-2cae40ed2dd1" id="sec.799A" provision.type="other" spent.amends="0"><no>799A</no><heading guid="_0e0810f9-627d-4df6-946e-fd35650019f4" id="sec.799A-he">Consequence of failure to comply with relinquishment requirement</heading><subclause affected.by.uncommenced="0" guid="_04b820ba-6816-42de-9107-3b77c6a0c4bd" id="sec.799A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7e3b587b-265b-4114-925f-c34e8f878f74" id="sec.799A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">noncompliance action taken is a requirement, under <intref check="valid" refid="sec.790" target.guid="_0ae40873-0f6d-4440-a74c-a02fa5649d4f">section 790</intref><intref check="valid" refid="sec.790-ssec.1" target.guid="_e5b16464-3b1b-49f2-9d8e-3b9d7c76d4ad">(1)</intref><intref check="valid" refid="sec.790-ssec.1-para1.b" target.guid="_be540110-8922-4c58-9559-fa56156b036c">(b)</intref>, of a petroleum authority holder; and</txt></block></li><li guid="_5e30d528-37bf-4fd0-b5dc-982a2bd5c48f" id="sec.799A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the requirement is not complied with.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0f325516-e6a2-45f0-809c-84d62269f567" id="sec.799A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The holder must be given a notice requiring the holder to comply with the requirement under <intref check="valid" refid="sec.790" target.guid="_0ae40873-0f6d-4440-a74c-a02fa5649d4f">section 790</intref><intref check="valid" refid="sec.790-ssec.1" target.guid="_e5b16464-3b1b-49f2-9d8e-3b9d7c76d4ad">(1)</intref><intref check="valid" refid="sec.790-ssec.1-para1.b" target.guid="_be540110-8922-4c58-9559-fa56156b036c">(b)</intref> within 20 business days after the giving of the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1401c81c-b496-41c5-a8a1-788ae1d97e2a" id="sec.799A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the holder does not comply with the requirement under the notice, the authority is cancelled.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_190eb14d-32de-4d3a-a91b-a755daf828d5" id="sec.799A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, the cancellation does not take effect until the holder is given a notice stating that the authority has been cancelled because of the operation of <intref check="valid" refid="sec.799A-ssec.3" target.guid="_1401c81c-b496-41c5-a8a1-788ae1d97e2a">subsection (3)</intref>.</txt></block></subclause></clause></subdivision></division></part><part affected.by.uncommenced="0" guid="_ab9c9b86-73cb-4fe7-8c14-ab67d64b2ca8" id="ch.10-pt.3"><no>Part 3</no><heading guid="_76f37abe-c666-4b8e-b3b1-ab285cdeb13d" id="ch.10-pt.3-he">Remediation of abandoned operating plant</heading><clause affected.by.uncommenced="0" guid="_64f3af6d-5b3f-4fb5-99d5-00bc8c6a6867" id="sec.799B" provision.type="other" spent.amends="0"><no>799B </no><heading guid="_f65ec62c-228f-4e75-a3bb-5fd62ed819db" id="sec.799B-he">Definitions for part</heading><block><txt break.before="1">In this part—</txt><deflist><definition affected.by.uncommenced="0" guid="_f9216c36-d354-4cd0-937c-4d17d127ff32" id="sec.799B-def.abandonedoperatingplant_"><txt break.before="1"><defterm guid="_2c06e16a-c27d-41b4-bbf8-d662c4b75498" id="sec.799B-def.abandonedoperatingplant" type="definition">abandoned operating plant</defterm> see <intref check="valid" refid="sec.799C" target.guid="_27ee6947-88d1-4eb5-9b6e-8e6b5a232a49">section 799C</intref>.</txt></definition><definition affected.by.uncommenced="0" change="ins" guid="_f654afed-6c30-4cac-8de7-33eb054b8d72" id="sec.799B-def.abandonedsite_"><txt break.before="1"><defterm guid="_18646d31-85ba-4cc2-b8ed-ccc35827a193" id="sec.799B-def.abandonedsite" type="definition">abandoned site</defterm> means land—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7d2cf8dc-d5f2-4ff6-bc5d-dfc245b9811b" id="sec.799B-def.abandonedsite-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">on which an abandoned operating plant is located; or</txt></block></li><li guid="_7a249002-427e-46e2-b87b-b55907a080ba" id="sec.799B-def.abandonedsite-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">within the boundary of a former tenure or authority for an abandoned operating plant.</txt></block></li></list></definition><definition affected.by.uncommenced="0" change="ins" guid="_fa71654c-d9ed-4130-b36b-9fcdf0e092fe" id="sec.799B-def.affectedland_"><txt break.before="1"><defterm guid="_19ace7a6-1579-4290-97d9-a29c5fb408be" id="sec.799B-def.affectedland" type="definition">affected land</defterm> see section 799D(2).</txt></definition><definition affected.by.uncommenced="0" change="insReplace" guid="_ea9af199-062c-440e-808c-b155c82ae0c6" id="sec.799B-def.authorisedperson_"><txt break.before="1"><defterm guid="_02d330d5-e31d-4048-8ad0-2a1b1fa3325d" id="sec.799B-def.authorisedperson" type="definition">authorised person</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9a794d77-c335-4e7c-9814-a843f08f2757" id="sec.799B-def.authorisedperson-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for an abandoned site—a person authorised by the chief executive under section 799D(1) to enter the abandoned site; or</txt></block></li><li guid="_8ef64086-decc-49ba-94b9-e32a868a3771" id="sec.799B-def.authorisedperson-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for affected land—a person authorised by the chief executive under section 799D(2) to enter the affected land.</txt></block></li></list></definition><definition affected.by.uncommenced="0" change="delReplace" guid="_165adea4-76bf-4009-b802-3190c9b0a08b-del" id="sec.799B-def.authorisedperson_-del"><txt break.before="1"><defterm guid="_9f8062d3-da70-4a3f-969b-529305b4b02c-del" id="sec.799B-def.authorisedperson-del" type="definition">authorised person</defterm> means a person authorised by the chief executive under <intref check="valid" refid="sec.799D" target.guid="_d692a50b-3f8c-407f-ad39-8861d356f2f1">section 799D</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_362fabbd-97ec-43d0-960f-2603ee9090ca" id="sec.799B-def.formertenureorauthority_"><txt break.before="1"><defterm guid="_18ccaa22-1fa7-406d-ae80-464ef52d4868" id="sec.799B-def.formertenureorauthority" type="definition">former tenure or authority</defterm>, for an abandoned operating plant, means a relevant tenure or authority—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dd171fe4-fdb5-4160-83b7-adefb9a4489c" id="sec.799B-def.formertenureorauthority-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">under which an authorised activity was previously carried out in relation to the abandoned operating plant; and</txt></block></li><li guid="_9afc8054-9631-469f-b376-20fe6aa95000" id="sec.799B-def.formertenureorauthority-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">that is no longer in force.</txt></block></li></list></definition><definition affected.by.uncommenced="0" change="del" guid="_c7096e13-1b90-49aa-a61e-ad40a7ba7582-del" id="sec.799B-def.primaryland_-del"><txt break.before="1"><defterm guid="_e6dcc7e6-d866-49d2-a611-942183f9d28f-del" id="sec.799B-def.primaryland-del" type="definition">primary land</defterm>, for an abandoned operating plant, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ac0d4637-50a0-4e2e-a334-a4e476c4f722-del" id="sec.799B-def.primaryland-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">land on which the abandoned operating plant is located; or</txt></block></li><li guid="_5fa7a3e2-758b-49d5-9d73-a97869ddc2d3-del" id="sec.799B-def.primaryland-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">land within the boundary of a former tenure or authority for the abandoned operating plant.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_2b774a57-d151-4bee-9d01-8d8c7295900d" id="sec.799B-def.relevanttenureorauthority_"><txt break.before="1"><defterm guid="_dfe2ec6f-bde0-4784-8c04-8e58ce8ea31d" id="sec.799B-def.relevanttenureorauthority" type="definition">relevant tenure or authority</defterm> means any of the following tenures or authorities—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c8316fe3-afd8-49bf-ae99-52dde97be2e6" id="sec.799B-def.relevanttenureorauthority-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> petroleum tenure;</txt></block></li><li guid="_8cadc0d1-a7dd-4d93-9a2c-19ba6077c073" id="sec.799B-def.relevanttenureorauthority-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a coal or oil shale mining tenement;</txt></block></li><li guid="_f496e070-95cc-4140-8d15-0084d0062c19" id="sec.799B-def.relevanttenureorauthority-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a geothermal tenure;</txt></block></li><li guid="_f1062a2c-99d5-4865-8da8-8c24a0031b8a" id="sec.799B-def.relevanttenureorauthority-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a GHG tenure;</txt></block></li><li guid="_455cf097-5ab3-4b46-91c7-47968e4de9ac" id="sec.799B-def.relevanttenureorauthority-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">a mineral hydrocarbon mining lease;</txt></block></li><li guid="_5f231544-96d7-4fc3-8a3f-c723d4ea9811" id="sec.799B-def.relevanttenureorauthority-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">a petroleum authority.</txt></block></li></list></definition><definition affected.by.uncommenced="0" change="del" guid="_8eff50da-3bff-40f7-afbf-fdd18c827346-del" id="sec.799B-def.remediationactivities_-del"><txt break.before="1"><defterm guid="_0c6fcc35-43cc-4606-b059-8aca7e3048d6-del" id="sec.799B-def.remediationactivities-del" type="definition">remediation activities</defterm> see <intref check="valid" refid="sec.799D" target.guid="_d692a50b-3f8c-407f-ad39-8861d356f2f1">section 799D</intref>.</txt></definition><definition affected.by.uncommenced="0" change="ins" guid="_2d3c6195-31b4-473f-9933-9e9a5f10e25c" id="sec.799B-def.remediationactivity_"><txt break.before="1"><defterm guid="_228a6044-c00c-4cf5-9aba-8d1059ee77b0" id="sec.799B-def.remediationactivity" type="definition">remediation activity</defterm> see section 799CA.</txt></definition></deflist></block></clause><clause affected.by.uncommenced="0" guid="_27ee6947-88d1-4eb5-9b6e-8e6b5a232a49" id="sec.799C" provision.type="other" spent.amends="0"><no>799C </no><heading guid="_b0eb7239-02b9-4001-9fd6-b4e736136412" id="sec.799C-he">Meaning of <defterm guid="_8e5b6ea4-3151-43ec-872a-262a666424b1" id="sec.799C-def.abandonedoperatingplant" type="definition">abandoned operating plant</defterm></heading><subclause affected.by.uncommenced="0" guid="_f774c926-15f4-40e3-9c61-c288ddf0ad7c" id="sec.799C-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An <defterm guid="_f9a3e0d3-b4a2-4058-9618-d9265ed67682" id="sec.799C-def.abandonedoperatingplant-oc.2" type="definition">abandoned operating plant</defterm> is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_22c2f38c-f2ef-4afd-bd27-93d801f1505f" id="sec.799C-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a facility, pipeline or system—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3a728f7e-7ea5-4c40-a803-ee749b7389f6" id="sec.799C-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">that is or was an operating plant mentioned in <intref check="valid" refid="sec.670" target.guid="_ca9c15a9-9ec2-415e-a6f6-8de0dd5edbf7">section 670</intref><intref check="valid" refid="sec.670-ssec.2" target.guid="_7c1ec3fa-8528-4d00-9ce3-6052aba5d47a">(2)</intref>; and</txt></block></li><li guid="_5a1be866-bfe4-4c49-b111-7f26b96a4564" id="sec.799C-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">for which a relevant tenure or authority required under an Act is not in force; and</txt></block></li><li guid="_b3b6beba-a4fc-49b1-8107-f1dc214fa119" id="sec.799C-ssec.1-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">for which no environmental authority is in force; or</txt></block></li></list></block></li><li guid="_36a75800-7fee-48ef-bade-f4ab83734e77" id="sec.799C-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a place, or part of a place—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6d42cbf0-5d4d-419a-9a05-12c2d3fb8508" id="sec.799C-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">that is or was an operating plant mentioned in <intref check="valid" refid="sec.670" target.guid="_ca9c15a9-9ec2-415e-a6f6-8de0dd5edbf7">section 670</intref><intref check="valid" refid="sec.670-ssec.5" target.guid="_69e2c6c8-6d45-4884-b79c-259f105afb6b">(5)</intref>; and</txt></block></li><li guid="_06d58fc0-bfd9-461a-bc77-fc082fa0bf43" id="sec.799C-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if an activity at the place, or part of the place, was carried out for a relevant tenure or authority—for which the relevant tenure or authority is not in force; and</txt></block></li><li guid="_d11128d7-021f-4418-bbd1-94f8edc3c31b" id="sec.799C-ssec.1-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">for which no environmental authority is in force; or</txt></block></li></list></block></li><li guid="_4a80c5d4-8f59-41df-9470-35a373ae6a25" id="sec.799C-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">an authorised activity—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_39d8b355-babd-4afd-9d77-0c404c806223" id="sec.799C-ssec.1-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">that was an operating plant mentioned in <intref check="valid" refid="sec.670" target.guid="_ca9c15a9-9ec2-415e-a6f6-8de0dd5edbf7">section 670</intref><intref check="valid" refid="sec.670-ssec.6" target.guid="_71029d28-afec-43f6-b66e-bf422d0140e6">(6)</intref> and <intref check="valid" refid="sec.670-ssec.7" target.guid="_5c8852f3-19f0-44a0-b6ec-30ae5c8e49ba">(7)</intref>; and</txt></block></li><li guid="_51c6dee2-ea94-48c0-a6b1-decad06eb354" id="sec.799C-ssec.1-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">for which no relevant tenure or authority is in force; and</txt></block></li><li guid="_1163b438-8c1b-4f69-9d6e-66d40412125c" id="sec.799C-ssec.1-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">for which no environmental authority is in force; or</txt></block></li></list></block></li><li guid="_3a36456d-b63c-49d2-8327-51ce8d455cf9" id="sec.799C-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">any other thing prescribed by regulation that is or was an operating plant.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_78613751-a95b-44c7-9552-cc6d5c510715" id="sec.799C-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An <defterm guid="_3304c934-26d6-49cf-9eb2-f5df2ea87548" id="sec.799C-def.abandonedoperatingplant-oc.3" type="definition">abandoned operating plant</defterm> does not include a site where a bore drilled under the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref> or a legacy borehole is located.</txt></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_beca77dc-e5c5-4642-a20b-4ea971cba208" id="sec.799CA" provision.type="other" spent.amends="0"><no>799CA </no><heading guid="_02c278c0-c3fa-40b1-a59e-3a9b0c159692" id="sec.799CA-he">Meaning of <defterm guid="_605a7422-cd5e-4f9e-8063-46a1d2ca1588" type="mention">remediation activity</defterm></heading><subclause affected.by.uncommenced="0" guid="_9e5aa883-f328-4560-93d9-6cc018e42137" id="sec.799CA-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Each of the following activities is a <defterm guid="_b179615b-1e92-4967-8ad3-c83a1e80d7a8" id="sec.799CA-def.remediationactivity-oc.2" type="definition">remediation activity</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_35fb6de2-2dec-445c-936e-1e44a3fe7cb5" id="sec.799CA-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">investigating the condition of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_27839365-3dba-418d-a2a6-254d9cbaa09b" id="sec.799CA-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">an abandoned site or affected land; or</txt></block></li><li guid="_6eb9c234-48aa-4659-81ad-83c633ba4594" id="sec.799CA-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">an abandoned operating plant; or</txt></block></li><li guid="_4a84c7cd-e1cd-44d9-a8b8-177c1591fd37" id="sec.799CA-ssec.1-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">a structure or equipment on an abandoned site or affected land related to the abandoned operating plant;</txt></block></li></list></block></li><li guid="_00c5ab55-aec5-4213-a89e-2e96ca18b474" id="sec.799CA-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">capping a wellhead on an abandoned site;</txt></block></li><li guid="_8b2fb749-8756-42b9-99e3-de5eb0bc3fb5" id="sec.799CA-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">drilling a well or water bore on an abandoned site or affected land to monitor or remediate the site, land or an abandoned operating plant;</txt></block></li><li guid="_8b812423-d860-47a1-8c5b-8b481f50e34c" id="sec.799CA-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">maintaining an abandoned operating plant to make it safe;</txt><note guid="_5375ef1c-ed51-4b04-8412-08540ec09240" id="sec.799CA-ssec.1-para1.d-note" type="example"><heading guid="_4bbee9b3-9241-476c-9608-1a921b2e48a7" id="sec.799CA-ssec.1-para1.d-note-he">Examples—</heading><block><txt break.before="1">monitor, inspect, carry out repairs</txt></block></note></block></li><li guid="_b87c396e-496c-439a-81d5-b63adfe8eaa4" id="sec.799CA-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">decommissioning an abandoned operating plant;</txt><note guid="_e1d613a2-a8ec-4687-b7ed-744ab172c45b" id="sec.799CA-ssec.1-para1.e-note" type="example"><heading guid="_17abd94a-b0bd-4fd2-a1f7-9ad461a3d7c6" id="sec.799CA-ssec.1-para1.e-note-he">Examples—</heading><block><txt break.before="1">degassing a facility, removing part of a facility</txt></block></note></block></li><li guid="_0a6caaff-ece3-4a85-be12-54f639ea823d" id="sec.799CA-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">removing, modifying or otherwise making safe structures or equipment on an abandoned site or affected land that are related to an abandoned operating plant;</txt></block></li><li guid="_bf1ae6d4-e857-4c38-8057-52a69ec7096d" id="sec.799CA-ssec.1-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">mitigating, managing, treating or cleaning up pollution that is on an abandoned site or affected land because of, directly or indirectly, an abandoned operating plant;</txt></block></li><li guid="_80f5bc5b-9628-4e29-aa92-960211723f16" id="sec.799CA-ssec.1-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">maintaining, managing and monitoring the condition of an abandoned site or affected land, including, for example—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3711685f-908c-4d62-8399-b44f6304ce7e" id="sec.799CA-ssec.1-para1.h-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">repairing erosion of the site or land, or vegetation on the site or land; or</txt></block></li><li guid="_fc99dee8-f930-4616-a269-cb7ab02cd5c9" id="sec.799CA-ssec.1-para1.h-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">preventing further erosion of the site, land or vegetation; or</txt></block></li><li guid="_92974d75-4200-4862-b220-b4017b1d0789" id="sec.799CA-ssec.1-para1.h-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">revegetating the site or land;</txt></block></li></list></block></li><li guid="_4f3e8ec1-0c99-4a74-9a63-92d13ad3535a" id="sec.799CA-ssec.1-para1.i" provision.type="other"><no>(i)</no><block><txt break.before="0">if an abandoned site or affected land is contaminated land under the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Environmental Protection Act</name></legref>—conducting work to remediate the site or land;</txt></block></li><li guid="_edd2628e-319c-4fe3-947f-4acfd31b913e" id="sec.799CA-ssec.1-para1.j" provision.type="other"><no>(j)</no><block><txt break.before="0">removing, mitigating or managing a hazard on an abandoned site or affected land because of, directly or indirectly, an abandoned operating plant;</txt></block></li><li guid="_61b46328-e7b5-496c-9292-f3de9b158ea1" id="sec.799CA-ssec.1-para1.k" provision.type="other"><no>(k)</no><block><txt break.before="0">mitigating, managing or monitoring risks to, or adverse impacts on, public health or safety, other property or the environment because of, directly or indirectly, an abandoned operating plant, including, by constructing infrastructure or installing equipment;</txt></block></li><li guid="_1793bff9-9292-4d08-bbea-a95e68ed1d0e" id="sec.799CA-ssec.1-para1.l" provision.type="other"><no>(l)</no><block><txt break.before="0">another activity on an abandoned site or affected land, or in relation to an abandoned operating plant, prescribed by regulation—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bba8c10f-5e4e-4989-af22-ca2a763a7127" id="sec.799CA-ssec.1-para1.l-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">to make the site, land or abandoned operating plant safe; </txt></block></li><li guid="_93b91945-cd1a-4ce2-b3b5-058c2a1f904c" id="sec.799CA-ssec.1-para1.l-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">to mitigate, manage or monitor risks to, or adverse impacts on, public health or safety, other property or the environment because of, directly or indirectly, an abandoned operating plant.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_996190d1-561b-425a-99cd-2fd961eea634" id="sec.799CA-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_de376882-aee7-4d6f-af47-620b9149df1b" id="sec.799CA-ssec.2-def.otherproperty_"><txt break.before="1"><defterm guid="_bbaeceea-2f0c-4fa4-bee0-173b5d604d57" id="sec.799CA-ssec.2-def.otherproperty" type="definition">other property</defterm>, in relation to an abandoned operating plant, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5923d3a0-8054-497c-8fcd-ab8169e117b9" id="sec.799CA-ssec.2-def.otherproperty-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">land that is not an abandoned site or affected land related to the abandoned operating plant; or</txt></block></li><li guid="_90e00ccb-6006-470c-ab65-1ab60ccce7b4" id="sec.799CA-ssec.2-def.otherproperty-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a structure, equipment or other thing, other than a structure or equipment—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e29dcf38-3752-44b1-bed2-1c5b141cd8a4" id="sec.799CA-ssec.2-def.otherproperty-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">related to the abandoned operating plant; or</txt></block></li><li guid="_0100d323-b655-44b9-9497-baef5aa4cc75" id="sec.799CA-ssec.2-def.otherproperty-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">on an abandoned site or affected land related to the abandoned operating plant.</txt></block></li></list></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" change="insReplace" guid="_123ad6df-cae6-422f-ad9c-f535fd4bd7ee" id="sec.799D" provision.type="other" spent.amends="0"><no>799D </no><heading guid="_9ebffa38-9fb3-4b45-8d46-a897845ce370" id="sec.799D-he">Authorised person to carry out remediation activities</heading><subclause affected.by.uncommenced="0" guid="_c1144bcd-ac0a-4859-9974-1510d060d136" id="sec.799D-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may authorise a person to enter an abandoned site to carry out 1 or more remediation activities.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a693ab22-b9e4-45b0-b959-6c2e63570182" id="sec.799D-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Also, the chief executive may authorise a person to enter land (<defterm guid="_050dbeb0-35f3-40d2-8613-a81b6d4ad89d" id="sec.799D-def.affectedland" type="definition">affected land</defterm>) to carry out 1 or more remediation activities if the chief executive is satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_705ad7c8-4340-4dbf-81c7-7bc7ad2016af" id="sec.799D-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the remediation activities may be, or are, required to be carried out on the land because of, directly or indirectly, an abandoned operating plant on an abandoned site; or</txt></block></li><li guid="_7b68331a-956e-4589-a42c-f4fbd1b52378" id="sec.799D-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the entry is necessary to carry out remediation activities on an abandoned site.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d5c017b7-2f51-452e-a50f-ec62f1d0ef2a" id="sec.799D-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The authorisation must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9e4e5c8b-4cbf-4f18-8f55-763701bb1acc" id="sec.799D-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in writing; and</txt></block></li><li guid="_fb88a527-cac6-4f8d-b3cf-265f9b94214a" id="sec.799D-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">state the period of the authorisation.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" change="insReplace" guid="_f0421ec0-06ba-430b-b01a-116deeeec327" id="sec.799E" provision.type="other" spent.amends="0"><no>799E </no><heading guid="_7ba2626e-010d-45ee-a283-d864d62ab9ac" id="sec.799E-he">Entering land to carry out remediation activities</heading><subclause affected.by.uncommenced="0" guid="_7dac36ee-a485-43cb-8795-8b9091e7bd94" id="sec.799E-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An authorised person may enter an abandoned site to carry out remediation activities if the authorised person has given the owner and occupier of the land the notice of entry required under section 799F.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f55ecbb1-fe24-45da-b622-c579f883d503" id="sec.799E-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An authorised person may enter affected land if the owner and occupier of the land have consented to the entry under section 799G.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2257d1dc-415c-41e1-9bcd-e7d6deee06cb" id="sec.799E-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">An authorised person for an abandoned site may enter land adjacent to the site if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8f45d54a-00a7-4f23-b3cd-35195aedfdf0" id="sec.799E-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the entry is only for the purpose of entering the site under subsection (1) or (4); and</txt></block></li><li guid="_c666a19b-5351-496f-a359-ced14fb17df5" id="sec.799E-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">entering the adjacent land is the only reasonably practicable way for the authorised person to enter the site; and</txt></block></li><li guid="_5a35c3c3-3a70-4f20-a6e3-bac5ecb2303b" id="sec.799E-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the authorised person has given the owner and occupier of the adjacent land the notice of entry required under section 799F.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_92e5fabd-22b1-40d4-ab7e-278c55e3933d" id="sec.799E-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">An authorised person may enter land mentioned in subsection (1), (2) or (3) without giving notice of entry to, or the consent of, the owner or occupier of the land to carry out remediation activities if carrying out the activities are necessary to preserve life or property.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a49b45b4-fe07-421d-a439-ba85b5441a8a" id="sec.799E-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">This section does not authorise an authorised person to enter a structure used for residential purposes without the consent of the occupier of the structure.</txt></block></subclause></clause><clause affected.by.uncommenced="0" change="insReplace" guid="_f89e819b-284f-40eb-a978-ecb4ca102abb" id="sec.799F" provision.type="other" spent.amends="0"><no>799F </no><heading guid="_b0df195e-38a3-4bec-a71b-4beaa5a428fe" id="sec.799F-he">Notice of entry</heading><subclause affected.by.uncommenced="0" guid="_0b5cf888-df36-4f90-ad10-2ed67266c8ed" id="sec.799F-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An authorised person who enters land under this part must give the owner and occupier of the land written notice about the entry—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2c0e449e-e5dd-4333-9ab2-215dc14dc2c6" id="sec.799F-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the land is entered to carry out remediation activities necessary to preserve life or property—within 10 business days after entering the land; or</txt></block></li><li guid="_52cc8fb8-5b3a-4c55-ac51-a69464c5b1fa" id="sec.799F-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise, if the land is an abandoned site—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b77a8db3-84d5-468d-bb53-3647174fb8e5" id="sec.799F-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">at least 10 business before entering the land; or</txt></block></li><li guid="_ccabfc0c-ef8b-4186-b8ae-51f1b9734750" id="sec.799F-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a shorter period agreed by the owner and occupier.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6db9ec69-5a96-4851-9baa-509c01e26a05" id="sec.799F-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The written notice must state the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f6b00516-e6cc-4c0c-bade-ed1ea1d514b4" id="sec.799F-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">when the entry was made or is to be made;</txt></block></li><li guid="_8ed1110d-f0fe-4859-81de-38ef265abfd8" id="sec.799F-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the purpose of the entry;</txt></block></li><li guid="_b4813a85-3ca3-4999-96db-6506e1f1aaed" id="sec.799F-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the notice relates to land other than affected land—that the authorised person is permitted under this Act to enter the land without consent or a warrant;</txt></block></li><li guid="_a2fd9d30-0243-43bd-aa3d-427e04b61d2a" id="sec.799F-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the remediation activities carried out or proposed to be carried out.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" change="insReplace" guid="_b2f0ba63-f94b-41e7-b9f3-cbfd0d871805" id="sec.799G" provision.type="other" spent.amends="0"><no>799G </no><heading guid="_99371c65-cf24-422c-83e2-e6f2d8875142" id="sec.799G-he">Consent of owner or occupier to enter affected land</heading><subclause affected.by.uncommenced="0" guid="_cc013299-73a4-4c68-a198-3fd4516bf2fb" id="sec.799G-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if an authorised person intends to ask the owner or occupier of affected land for consent to enter the land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_947e65e4-0121-41d6-88dd-a8574e5e5b5d" id="sec.799G-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For the purpose of asking the owner or occupier for the consent, the authorised person may, without the consent of the owner or occupier, or a warrant—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_928d8a88-892f-4921-86ec-559ad0b012c2" id="sec.799G-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">enter land around premises at the affected land to an extent that is reasonable to contact an occupier of the affected land; or</txt></block></li><li guid="_5fa17ccc-209e-4ec3-844d-903c8d5fa1e3" id="sec.799G-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">enter part of the affected land the authorised person reasonably considers members of the public ordinarily are allowed to enter when they wish to contact an occupier of the affected land.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_4cd336a5-44a9-4b18-ace0-7a962c8463b3" id="sec.799G-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">When asking for the consent, the authorised person must tell the owner or occupier—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_eb6c99bb-c7bd-4a49-a337-83f27609290f" id="sec.799G-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">about the purpose of the entry; and</txt></block></li><li guid="_25901b82-fd2b-4d8e-850b-f3ab1f6fe25a" id="sec.799G-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the proposed day, time and duration of the entry; and</txt></block></li><li guid="_3f2cf212-668e-4597-9033-bfd1ee25fa0b" id="sec.799G-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that the owner or occupier is not required to consent; and</txt></block></li><li guid="_b23149f1-05a7-4331-a5d6-ac83e3708d79" id="sec.799G-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">that the consent may be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4207b0cd-c8fa-47ba-91ab-eaee93eb30a1" id="sec.799G-ssec.3-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">given subject to reasonable conditions, other than a condition requiring compensation for the entry; and</txt></block></li><li guid="_1286ef98-0d0a-48ab-9ede-b253fb53c6ae" id="sec.799G-ssec.3-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">may be withdrawn at any time.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9174f230-2523-4fcc-912d-d68f03e0fc53" id="sec.799G-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the owner or occupier gives the consent, the authorised person may ask the owner or occupier to sign an acknowledgement of the consent.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_442ad33f-fc04-4b6e-af37-187019865be0" id="sec.799G-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The acknowledgement must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bdd3b9e9-5f4f-4811-8de1-5f92d17dd590" id="sec.799G-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the purpose of the entry, including the remediation activities to be carried out; and</txt></block></li><li guid="_478c6b05-ef40-49c7-ad00-e1f4a8b0e413" id="sec.799G-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the following has been explained to the owner or occupier—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d5e64d6a-d2ee-47cb-a60d-cf65b9a9047e" id="sec.799G-ssec.5-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the purpose of the entry, including the remediation activities to be carried out;</txt></block></li><li guid="_1e9302dd-9b58-4a6b-b889-2d26c14effe9" id="sec.799G-ssec.5-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the proposed day, time and duration of the entry;</txt></block></li><li guid="_b84152f2-2941-4541-b1df-e36a528b8af8" id="sec.799G-ssec.5-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">that the owner or occupier is not required to consent;</txt></block></li><li guid="_b1c9935d-aa27-4f4a-b8c4-3114efe1a0ca" id="sec.799G-ssec.5-para1.b-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">that the consent may be given subject to conditions, other than a condition requiring compensation for the entry, and may be withdrawn at any time; and</txt></block></li></list></block></li><li guid="_5538be9a-3972-4bde-8e85-4439b166519f" id="sec.799G-ssec.5-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the owner or occupier gives the authorised person consent to enter the land and carry out the remediation activities; and</txt></block></li><li guid="_b1b390f1-aa23-4cfc-8ae7-66d6b795b610" id="sec.799G-ssec.5-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the day and time the consent was given; and</txt></block></li><li guid="_be268b08-89e2-421b-a058-7b23bd1246f6" id="sec.799G-ssec.5-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">any conditions of the consent.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8dbb9dfa-6e01-48ea-96a8-9f833b13eb9d" id="sec.799G-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">If the owner or occupier signs the acknowledgement, the authorised person must give a copy of the acknowledgement to the owner and occupier.</txt></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_6bddd333-b903-4a0f-bef4-8e942d0d8d3c" id="sec.799GA" provision.type="other" spent.amends="0"><no>799GA </no><heading guid="_7a2dff95-d2fc-4f0b-8791-02685b1aab09" id="sec.799GA-he">Obligation of authorised person in carrying out remediation activities</heading><block><txt break.before="1">An authorised person who enters land under this part—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ccd7b1a2-c837-4978-abbb-8e6d248bb837" id="sec.799GA-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">must not cause, or contribute to, unnecessary damage to any structure or works on the land; and</txt></block></li><li guid="_28c8f70f-c1bc-4adf-9ec2-37954a8cc828" id="sec.799GA-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">must take all reasonable steps to ensure the person causes as little inconvenience, and does as little other damage, as is practicable in the circumstances.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" change="ins" guid="_9cb5cb1d-2c7d-4f37-98a7-34cc9da6f759" id="sec.799GB" provision.type="other" spent.amends="0"><no>799GB </no><heading guid="_66171d1e-4b8d-4046-87e2-00b2ea49196b" id="sec.799GB-he">Report to owner and occupier after entry of affected land</heading><subclause affected.by.uncommenced="0" guid="_23d6b398-5bb3-4636-a2b0-e5ccd82d96ea" id="sec.799GB-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if an authorised person enters affected land to carry out remediation activities with the consent of the owner and occupier of the land given under section 799G.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_13ec4875-481b-4681-a504-9ae00041ea81" id="sec.799GB-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The authorised person must give the owner and occupier a report about the entry within 30 days after the entry ends.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_25c7c527-7f7f-4f78-8ca6-d10f7a99f381" id="sec.799GB-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The report must state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f8266ceb-e468-45c9-9380-2ca688ccd3cb" id="sec.799GB-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">whether or not remediation activities were carried out on the affected land; and</txt></block></li><li guid="_14885850-3437-4403-959c-7d3e155a23f3" id="sec.799GB-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if activities were carried out on the land—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cf747b97-6715-4239-a556-81a86688ed70" id="sec.799GB-ssec.3-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the nature and extent of the activities; and</txt></block></li><li guid="_b860ee12-20c1-4498-9b99-526558a188f3" id="sec.799GB-ssec.3-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">where on the land the activities were carried out; and</txt></block></li></list></block></li><li guid="_e34c1c99-5e1a-4bdc-9797-67b8b532fd4b" id="sec.799GB-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">another matter prescribed by regulation for the report.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_09d822b4-788b-4e67-a6b8-0878ebae540f" id="sec.799GB-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, the authorised person is not required to give a report to the owner or occupier of the affected land under this section if the owner or occupier does not wish to receive the report.</txt></block></subclause></clause><clause affected.by.uncommenced="0" change="delReplace" guid="_d692a50b-3f8c-407f-ad39-8861d356f2f1-del" id="sec.799D-del" provision.type="other" spent.amends="0"><no>799D </no><heading guid="_1cb5cb9f-f2a6-4148-835d-3784822fe68d-del" id="sec.799D-he-del">Authorised person to carry out remediation activities</heading><block><txt break.before="0">The chief executive may authorise a person to carry out 1 or more of the following activities (<defterm guid="_0de2d68a-67e4-42d8-bc6e-97f627a1d6d2-del" id="def.remediationactivities-del" type="definition">remediation activities</defterm>) in relation to an abandoned operating plant—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c6bd47a4-a299-488a-8234-b7d7cfc82782-del" id="sec.799D-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">investigate the condition of the abandoned operating plant or the primary land for the abandoned operating plant;</txt></block></li><li guid="_6d5320cc-c1b9-4835-aa0d-1b38056219e9-del" id="sec.799D-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">cap a wellhead;</txt></block></li><li guid="_5cae1d21-2eaf-4ed2-89a4-d14238dd8b3f-del" id="sec.799D-para1.c-del" provision.type="other"><no>(c)</no><block><txt break.before="0">drill a well or water bore on the primary land to monitor or remediate the abandoned operating plant or the primary land;</txt></block></li><li guid="_42ed3193-2aef-484d-b2a7-c61ef04e81e4-del" id="sec.799D-para1.d-del" provision.type="other"><no>(d)</no><block><txt break.before="0">maintain the abandoned operating plant to make it safe;</txt><note guid="_ad1e4e23-2172-41da-92ab-4245361371dc-del" id="sec.799D-para1.d-note-del" type="example"><heading guid="_b4981985-685d-4cb3-89f2-c25964519233-del" id="sec.799D-para1.d-note-he-del">Example for <intref check="valid" refid="sec.799D-para1.d" target.guid="_42ed3193-2aef-484d-b2a7-c61ef04e81e4">paragraph (d)</intref>—</heading><block><txt break.before="1">monitor, inspect, carry out repairs</txt></block></note></block></li><li guid="_0bf6faa5-eb1b-45e9-a744-067e0173372b-del" id="sec.799D-para1.e-del" provision.type="other"><no>(e)</no><block><txt break.before="0">decommission the abandoned operating plant;</txt><note guid="_360537fe-6faa-4307-b1ae-cadc2a417590-del" id="sec.799D-para1.e-note-del" type="example"><heading guid="_e9f30bb5-1216-408b-b3c2-c5f527ddf054-del" id="sec.799D-para1.e-note-he-del">Example for <intref check="valid" refid="sec.799D-para1.e" target.guid="_0bf6faa5-eb1b-45e9-a744-067e0173372b">paragraph (e)</intref>—</heading><block><txt break.before="1">degassing a facility, removing part of a facility</txt></block></note></block></li><li guid="_6b39114b-bd5e-4b12-916d-56bd7ae1982f-del" id="sec.799D-para1.f-del" provision.type="other"><no>(f)</no><block><txt break.before="0">remove, or make safe, structures or equipment on the primary land that are associated with the abandoned operating plant;</txt></block></li><li guid="_5adecdfe-6f0f-49df-8aad-294dc9529b02-del" id="sec.799D-para1.g-del" provision.type="other"><no>(g)</no><block><txt break.before="0">repair erosion, or prevent further erosion, of the primary land or vegetation on the primary land;</txt></block></li><li guid="_6afc48a6-33c9-4e62-84a6-e17e82dcfe42-del" id="sec.799D-para1.h-del" provision.type="other"><no>(h)</no><block><txt break.before="0">clean up pollution remaining on the primary land;</txt></block></li><li guid="_51d1c084-77a2-4a92-9339-071c5c672336-del" id="sec.799D-para1.i-del" provision.type="other"><no>(i)</no><block><txt break.before="0">if the primary land is contaminated land under the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act"><name emphasis="no">Environmental Protection Act</name></legref>—conduct work to remediate the primary land;</txt></block></li><li guid="_6b6724da-acea-41b6-9ee0-96a57ce41e87-del" id="sec.799D-para1.j-del" provision.type="other"><no>(j)</no><block><txt break.before="0">any other activity prescribed by regulation that relates to ensuring the safety of the abandoned operating plant or the primary land.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" change="delReplace" guid="_afa09990-133e-4d4e-ba8e-ecf0a68e1578-del" id="sec.799E-del" provision.type="other" spent.amends="0"><no>799E </no><heading guid="_5968d400-d7f3-4d66-b6a6-3cd9be9f614a-del" id="sec.799E-he-del">Entering land to carry out remediation activities</heading><subclause affected.by.uncommenced="0" guid="_0b0e3511-2002-49c6-8904-621fd59b7c05-del" id="sec.799E-ssec.1-del" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the following land—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ac53e61d-5600-43ab-bbae-9ebd30c48345-del" id="sec.799E-ssec.1-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">primary land for an abandoned operating plant;</txt></block></li><li guid="_3d3d8118-35bf-4743-bb94-4c256601e26c-del" id="sec.799E-ssec.1-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">land (<defterm guid="_8336ea0d-17dc-4dfc-ba26-c7e02ac966c1-del" id="sec.799E-ssec.1-def.adjacentland-del" type="definition">adjacent land</defterm>) that is adjacent to primary land for an abandoned operating plant if an authorised person has no other reasonably practicable way of entering the primary land without entering the adjacent land.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7d976c90-a36a-4312-9387-2276ee0639e0-del" id="sec.799E-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">An authorised person may, to carry out remediation activities, enter the land—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fc2fc7aa-4a44-4c27-a4a0-a4eb2cef7687-del" id="sec.799E-ssec.2-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">if the carrying out of remediation activities is necessary to preserve life or property—at any time; or</txt></block></li><li guid="_cc0bc39d-d50c-468e-934d-eccd3ccbd553-del" id="sec.799E-ssec.2-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—at any time after the earlier of the following days—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0dc7bb34-3a89-4ad0-988b-e965cd4e32d6-del" id="sec.799E-ssec.2-para1.b-para2.i-del" provision.type="other"><no>(i)</no><block><txt break.before="0">the day the owner of the land is given notice of the entry under <intref check="valid" refid="sec.799F" target.guid="_58011007-40f7-4c6f-a5d9-4ddb09bb74a4">section 799F</intref>;</txt></block></li><li guid="_19a26169-41a5-4cee-9912-8cddbd175b4c-del" id="sec.799E-ssec.2-para1.b-para2.ii-del" provision.type="other"><no>(ii)</no><block><txt break.before="0">the day the occupier of the land is given notice of the entry under <intref check="valid" refid="sec.799F" target.guid="_58011007-40f7-4c6f-a5d9-4ddb09bb74a4">section 799F</intref>.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d84e3477-025f-483e-b71b-0d7aa55ab8e3-del" id="sec.799E-ssec.3-del" provision.type="other"><no>(3)</no><block><txt break.before="0">However, this section does not permit an authorised person to enter a structure, or a part of a structure, used for residential purposes without the consent of the occupier of the structure or part.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_75019dd6-12e1-4b1e-a2ca-32ac54497216-del" id="sec.799E-ssec.4-del" provision.type="other"><no>(4)</no><block><txt break.before="0">Despite <intref check="valid" refid="sec.799E-ssec.2" target.guid="_7d976c90-a36a-4312-9387-2276ee0639e0">subsection (2)</intref>, the authorised person may enter adjacent land only for the purpose of entering primary land for an abandoned operating plant.</txt></block></subclause></clause><clause affected.by.uncommenced="0" change="delReplace" guid="_58011007-40f7-4c6f-a5d9-4ddb09bb74a4-del" id="sec.799F-del" provision.type="other" spent.amends="0"><no>799F </no><heading guid="_41b8565b-04a7-4fec-a1d4-1e5923a6504b-del" id="sec.799F-he-del">Notice of entry</heading><subclause affected.by.uncommenced="0" guid="_8a1e14b0-00f0-47fc-9213-7252c13f4e11-del" id="sec.799F-ssec.1-del" provision.type="other"><no>(1)</no><block><txt break.before="0">An authorised person entering land under this part must give the owner and any occupier of the land notice of the entry—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a5b0b313-545e-4de4-bd1f-23dc41bda82b-del" id="sec.799F-ssec.1-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">if the carrying out of remediation activities is necessary to preserve life or property—within 10 business days after the entry is made; or</txt></block></li><li guid="_cf34a938-3a47-4e46-bc0b-0160e27dfffa-del" id="sec.799F-ssec.1-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—before entering the land.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e3ecb7d9-82c5-4db8-9f46-a5f9da19b5ba-del" id="sec.799F-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must state the following matters—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_04c61890-f261-4e87-9a8f-a94d4b6d30f5-del" id="sec.799F-ssec.2-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">the day on which entry was, or is to be, made;</txt></block></li><li guid="_ce49384e-57ca-4f2c-9198-310b2c63e7c1-del" id="sec.799F-ssec.2-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">the purpose of the entry and, if the land is primary land, the remediation activities carried out or proposed to be carried out;</txt></block></li><li guid="_67494369-7c7f-4bf2-b216-0b2a7df1172b-del" id="sec.799F-ssec.2-para1.c-del" provision.type="other"><no>(c)</no><block><txt break.before="0">that the authorised person is permitted under this part to enter the land without consent or a warrant.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" change="delReplace" guid="_04dffe73-fc27-4952-a4d8-505679fe5fe6-del" id="sec.799G-del" provision.type="other" spent.amends="0"><no>799G </no><heading guid="_eb622917-ca32-4bee-bc09-a3b9f86bd4f2-del" id="sec.799G-he-del">Obligation of authorised person in carrying out remediation activities</heading><block><txt break.before="1">An authorised person who enters land under this part—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3d64387f-ac80-4c73-bc9d-a4ec4273e396-del" id="sec.799G-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">must not cause, or contribute to, unnecessary damage to any structure or works on the land; and</txt></block></li><li guid="_2351f749-e2fd-449f-b709-f9d2a5d35cf5-del" id="sec.799G-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">must take all reasonable steps to ensure the person causes as little inconvenience, and does as little other damage, as is practicable in the circumstances.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_9968280a-fc51-4e9b-8d9a-9056b6d84e91" id="sec.799H" provision.type="other" spent.amends="0"><no>799H </no><heading guid="_6ec2a4a1-c930-4644-b9ba-5f5550141098" id="sec.799H-he">Abandoned operating plant is not operating plant</heading><subclause affected.by.uncommenced="0" guid="_3a6c64f2-4ef8-4958-942c-91949792246e" id="sec.799H-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">For the purposes of <intref check="valid" refid="ch.9" target.guid="_e115e3d8-9707-4c5d-b3e6-be71f8d522ee">chapter 9</intref> and the <legref check="valid" jurisd="QLD" target.doc.id="act-2011-018" target.version.series="192711dc-f0de-4bcb-809d-080b81854cef" type="act"><name emphasis="yes">Work Health and Safety Act 2011</name></legref>, an abandoned operating plant is taken not to be an operating plant.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_043a22d9-5dd6-4298-a661-5e35001a9970" id="sec.799H-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">This section applies despite <intref check="valid" refid="sec.670" target.guid="_ca9c15a9-9ec2-415e-a6f6-8de0dd5edbf7">section 670</intref>.</txt></block></subclause></clause></part></chapter><chapter affected.by.uncommenced="0" guid="_6c38d5e9-8804-4711-b9a3-7ae5df93ed58" id="ch.11"><no>Chapter 11</no><heading guid="_6f6586c4-2210-4039-8879-fa122cb39a26" id="ch.11-he">General offences</heading><part affected.by.uncommenced="0" change="ins" guid="_9352fdc0-75dd-4b8e-bdea-50ba6c506737" id="ch.11-pt.1AA"><no>Part 1AA</no><heading guid="_e60925f3-8f2f-4653-8b3d-f339e2a8e3de" id="ch.11-pt.1AA-he">Industrial manslaughter</heading><clause affected.by.uncommenced="0" guid="_7a2f7aab-01df-4bcc-abc3-cbc9fedd3c9c" id="sec.799I" provision.type="other" spent.amends="0"><no>799I </no><heading guid="_8803f21f-04ab-4333-b22a-f5575e7df40d" id="sec.799I-he">Definitions for part</heading><subclause affected.by.uncommenced="0" guid="_e16dc7f4-6f42-43e7-8a07-01c2df6e24c6" id="sec.799I-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">In this part—</txt><deflist><definition affected.by.uncommenced="0" guid="_0458dc4a-28a6-444f-ad76-8225e7db4890" id="sec.799I-ssec.1-def.conduct_"><txt break.before="1"><defterm guid="_d7afbeb7-4b15-426d-8d68-fbd8b049a1a1" id="sec.799I-ssec.1-def.conduct" type="definition">conduct</defterm> means an act or omission to perform an act.</txt></definition><definition affected.by.uncommenced="0" guid="_2122a7d3-3246-412f-826f-4403c83513d8" id="sec.799I-ssec.1-def.employer_"><txt break.before="1"><defterm guid="_6bdf9e3d-e597-495c-aac0-df48fd3cd710" id="sec.799I-ssec.1-def.employer" type="definition">employer</defterm>, for an operating plant or gas work, means a person who employs or otherwise engages a worker in relation to the operating plant or gas work.</txt></definition><definition affected.by.uncommenced="0" guid="_599492ab-815a-4f7f-925f-122b1117f9f3" id="sec.799I-ssec.1-def.gaswork_"><txt break.before="1"><defterm guid="_ce2c8f58-6579-4656-9f24-74a9cddbf412" id="sec.799I-ssec.1-def.gaswork" type="definition">gas work</defterm> see section 725.</txt></definition><definition affected.by.uncommenced="0" guid="_de16aeac-301d-4a34-9b55-2c64c862f187" id="sec.799I-ssec.1-def.seniorofficer_"><txt break.before="1"><defterm guid="_cf878158-5973-4be6-ad42-0255ec38557b" id="sec.799I-ssec.1-def.seniorofficer" type="definition">senior officer</defterm>, of an employer for an operating plant or gas work, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_29064b7a-9ed7-4f17-a9f2-ecddb8244f20" id="sec.799I-ssec.1-def.seniorofficer-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the employer is a corporation—an executive officer of the corporation; or</txt></block></li><li guid="_b06d86c7-2d6c-4a6f-a314-9a1233a3c68a" id="sec.799I-ssec.1-def.seniorofficer-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—the holder of an executive position (however described) in relation to the employer who makes, or takes part in making, decisions affecting all, or a substantial part, of the employer’s functions.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_689657a1-4afb-4bdf-bba8-a3d610c74186" id="sec.799I-ssec.1-def.worker_"><txt break.before="1"><defterm guid="_9754f2ad-908f-45b5-80af-a62540b169ec" id="sec.799I-ssec.1-def.worker" type="definition">worker</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_01857bfc-b597-40a6-a127-c70f585d115f" id="sec.799I-ssec.1-def.worker-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in relation to an operating plant—an individual who is employed or contracted to carry out work at the operating plant; or</txt></block></li><li guid="_81ce70cf-0f87-4b33-96a0-ac79f90868a7" id="sec.799I-ssec.1-def.worker-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">in relation to gas work—an individual who is employed or contracted to carry out work at the place where the gas work is carried out.</txt></block></li></list></definition></deflist></block></subclause><subclause affected.by.uncommenced="0" guid="_ddac3ca1-99fb-4ea3-b2ac-4bb29e5e9d51" id="sec.799I-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For this part, a person’s conduct <defterm guid="_1617b9e8-5edd-43ba-8cf2-32bd0647da4d" id="sec.799I-def.causes" type="definition">causes</defterm> death if it substantially contributes to the death.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_859022fc-4f4e-4cef-8a50-e966bf6ecc7b" id="sec.799J" provision.type="other" spent.amends="0"><no>799J </no><heading guid="_1cd885cb-db43-43f3-8eaf-0aee99d91312" id="sec.799J-he">Exception for the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Criminal Code</name></legref>, s 23</heading><block><txt break.before="1">The <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Criminal Code</name></legref>, section 23 does not apply in relation to an offence against this part.</txt></block></clause><clause affected.by.uncommenced="0" guid="_31e0588e-8413-4c23-ad6a-a52062f7bdbd" id="sec.799K" provision.type="other" spent.amends="0"><no>799K </no><heading guid="_a75e5d94-5e05-4330-b9c1-596588de00dd" id="sec.799K-he">Industrial manslaughter—employer</heading><subclause affected.by.uncommenced="0" guid="_47a6a15a-b16e-493f-9590-6059a6b66fcd" id="sec.799K-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An employer for an operating plant or gas work commits an offence if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d0244c47-f285-414d-8c26-e95d39605c15" id="sec.799K-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a worker—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d85ea0b1-97c1-4c04-b742-b76ecffc8c4c" id="sec.799K-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">dies in the course of carrying out work at the operating plant or the place where the gas work is carried out; or</txt></block></li><li guid="_c0c02156-fefe-4d2c-a710-3f20363d6381" id="sec.799K-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">is injured in the course of carrying out work at the operating plant, or the place where the gas work is carried out, and later dies; and</txt></block></li></list></block></li><li guid="_3ac315bf-9586-482f-aa83-87d8b53164b6" id="sec.799K-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the employer’s conduct causes the death of the worker; and</txt></block></li><li guid="_26022caf-9c68-4eb1-9497-c6b5c60d8e63" id="sec.799K-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the employer is negligent about causing the death of the worker by the conduct.</txt></block></li></list><penalty guid="_c0196ac9-bc09-4ce8-8df8-899731fd1321" id="sec.799K-ssec.1-pen"><block><txt break.before="1">Maximum penalty—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e261b9d1-187d-40ca-af8b-423d80d9e08e" id="sec.799K-ssec.1-pen-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for an individual—20 years imprisonment; or</txt></block></li><li guid="_4226ed08-204b-4113-b535-d5395f19614e" id="sec.799K-ssec.1-pen-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for a body corporate—100,000 penalty units.</txt></block></li></list></block></penalty><note guid="_1fd4cf8c-ea14-40d4-94f4-99062b4e3598" id="sec.799K-ssec.1-note" type="example"><heading guid="_b3c2ce50-744e-4d20-946c-28f4e190fa3a" id="sec.799K-ssec.1-note-he">Note—</heading><block><txt break.before="1">See section 840 in relation to imputing to a body corporate particular conduct of executive officers, employees or agents of the body corporate.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_e3518d28-caa2-49ee-9a4f-439b6c26b81f" id="sec.799K-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An offence against subsection (1) is a crime.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_417a5cda-0e90-458e-8790-1146fde89a4a" id="sec.799L" provision.type="other" spent.amends="0"><no>799L </no><heading guid="_5f35021d-b169-4d31-8ed2-8922916b0759" id="sec.799L-he">Industrial manslaughter—senior officer</heading><subclause affected.by.uncommenced="0" guid="_a9951dcf-3db3-4c5b-8e70-1963ab0e6586" id="sec.799L-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A senior officer of an employer for an operating plant or gas work commits an offence if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5ef7d15d-52ab-43c9-8b90-1ca87d69834e" id="sec.799L-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a worker—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cd213d86-e82e-4221-85a6-02494554b079" id="sec.799L-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">dies in the course of carrying out work at the operating plant or the place where the gas work is carried out; or</txt></block></li><li guid="_571b6dc7-86be-4e80-b17b-ea3d92d8d270" id="sec.799L-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">is injured in the course of carrying out work at the operating plant, or the place where the gas work is carried out, and later dies; and</txt></block></li></list></block></li><li guid="_05c87bc1-5d04-4357-a484-7f1fce5abe6f" id="sec.799L-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the senior officer’s conduct causes the death of the worker; and</txt></block></li><li guid="_42fe1cec-5f1b-4a0f-a189-ac8e338c9a5a" id="sec.799L-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the senior officer is negligent about causing the death of the worker by the conduct.</txt></block></li></list></block><penalty guid="_b7bb90d0-2f98-4db5-a3da-2c7c02794e79" id="sec.799L-ssec.1-pen"><block><txt break.before="1">Maximum penalty—20 years imprisonment.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_7426991e-6b1f-4dfa-8cff-4dd9c0a904e1" id="sec.799L-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An offence against subsection (1) is a crime.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_b66a3c77-59fc-4823-b2b4-53f3a5a1015d" id="ch.11-pt.1"><no>Part 1</no><heading guid="_b60054d8-24ea-4290-b5b3-6c58e40526e7" id="ch.11-pt.1-he">Restrictions relating to petroleum activities</heading><clause affected.by.uncommenced="0" guid="_3414ab4a-2c38-4af9-b578-754022462d1e" id="sec.800" provision.type="other" spent.amends="0"><no>800</no><heading guid="_eb64ee13-9067-4f59-bf0f-ccec60df6c8c" id="sec.800-he">Restriction on petroleum tenure activities</heading><subclause affected.by.uncommenced="0" guid="_7892f44a-995e-4ea1-ac7d-560e09a56d2a" id="sec.800-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not carry out a petroleum tenure activity in relation to land unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1b77e1ad-0893-4d9c-a119-3d942e90c6ec" id="sec.800-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the activity is carried out under this Act or the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> and under the authority of a petroleum tenure or a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> petroleum tenure; or</txt></block></li><li guid="_230604d0-cf87-4176-a892-713530ec5436" id="sec.800-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the carrying out of the activity is necessary to preserve life or property because of a dangerous situation or emergency that exists or may exist.</txt></block></li></list></block><penalty guid="_a7192feb-3678-48d6-9585-dc43ce0f5e2a" id="sec.800-ssec.1-pen"><block><txt break.before="1">Maximum penalty—2,000 penalty units.</txt></block></penalty><note guid="_fd649728-ec26-4164-9b25-a5855f97dfe8" id="sec.800-ssec.1-note" type="example"><heading guid="_544354cc-7633-4d65-847d-af014cf44ef8" id="sec.800-ssec.1-note-he">Note—</heading><block><txt break.before="1">This provision is an executive liability provision—see <intref check="valid" refid="sec.814" target.guid="_9fa8e8a1-4511-4ac6-b2de-5b287f47ce16">section 814</intref>.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_77b16481-9f04-4663-9ffd-042aa7434b91" id="sec.800-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.800-ssec.1" target.guid="_7892f44a-995e-4ea1-ac7d-560e09a56d2a">subsection (1)</intref> does not apply if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a877f0db-4236-4a98-b0f0-de7e13559de2" id="sec.800-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the activity is the exploration for coal seam gas under a coal or oil shale mining tenement; or</txt></block></li><li guid="_6c8162ff-b387-4944-8f66-448cbbd04c2d" id="sec.800-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the land is also in the area of a coal or oil shale mining lease and the activity is coal seam gas mining; or</txt><note guid="_8069fb4e-aedd-493a-b992-88f70a1cc486" id="sec.800-ssec.2-para1.b-note" type="example"><heading guid="_d73fca12-3692-440d-82e1-025492fdae01" id="sec.800-ssec.2-para1.b-note-he">Note—</heading><block><txt break.before="1">See the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.318CN" target.doc.id="act-1989-110" target.guid="_a3879f50-6ebc-40cf-afe4-cd740fdd22de" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">sections 318CN</legref> and <legref check="valid" jurisd="QLD" refid="sec.318CNA" target.doc.id="act-1989-110" target.guid="_42979194-5654-445b-b606-ae0b09b0961e" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">318CNA</legref>.</txt></block></note></block></li><li guid="_c8ab8b44-83d0-44f3-a023-24adc4f9006f" id="sec.800-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the activity is an activity mentioned in <intref check="valid" refid="sec.32" target.guid="_17d2869d-ceaf-4370-9aa7-b69853cdb6a8">section 32</intref><intref check="valid" refid="sec.32-ssec.2" target.guid="_9f2119c2-fafb-42aa-ba3b-6a8b4bfcc83a">(2)</intref> or <intref check="valid" refid="sec.109" target.guid="_06f97274-f5a7-4edf-b62f-55b51be78125">109</intref><intref check="valid" refid="sec.109-ssec.2" target.guid="_5b7b9f78-ad94-4ea8-ab20-00dd02de9aa2">(2)</intref> carried out under a coal or oil shale mining lease.</txt><note guid="_1f879f7c-11e5-475e-a392-8250b0ccbc54" id="sec.800-ssec.2-para1.c-note" type="example"><heading guid="_8264e295-d054-49e2-88a4-3d9180d7aa2f" id="sec.800-ssec.2-para1.c-note-he">Note—</heading><block><txt break.before="1">See however the <legref check="valid" jurisd="QLD" target.doc.id="act-2003-029" target.version.series="92a3dd8a-4970-4226-b844-032b4aa4d911" type="act"><name emphasis="yes">Gas Supply Act 2003</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.257AA" target.doc.id="act-2003-029" target.guid="_6216508e-4803-4930-82d1-5fe6599b18af" target.version.series="92a3dd8a-4970-4226-b844-032b4aa4d911" type="act">section 257AA</legref> (Exemption from Petroleum and Gas (Production and Safety) Act, <intref check="valid" refid="sec.800" target.guid="_3414ab4a-2c38-4af9-b578-754022462d1e">ss 800</intref>, <intref check="valid" refid="sec.802" target.guid="_951fb107-63e2-4a7d-88a5-e195517a9882">802</intref> and <intref check="valid" refid="sec.803" target.guid="_2c8d2aa3-d8dc-4b11-aff4-7fc962147fea">803</intref> for person complying with direction).</txt></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_56babc93-e2ac-41a8-9f9e-daaac7d7d10c" id="sec.800-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_bc7807f0-63cd-49ef-b639-d679f5a29f7d" id="sec.800-ssec.3-def.petroleumtenureactivity_"><txt break.before="1"><defterm guid="_5d9cf91e-3bec-4ad8-9ae1-b8e86f969e32" id="sec.800-ssec.3-def.petroleumtenureactivity" type="definition">petroleum tenure activity</defterm> means to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cfe4f953-4924-49f8-b107-be053c4e4d73" id="sec.800-ssec.3-def.petroleumtenureactivity-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">explore for or produce petroleum; or</txt></block></li><li guid="_6dfc3e90-11ad-4ee3-9f2b-067e224944ef" id="sec.800-ssec.3-def.petroleumtenureactivity-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">test, develop or use a natural underground reservoir for storage of petroleum or a prescribed storage gas; or</txt></block></li><li guid="_25dc947b-4218-4ca4-8f66-d3a9abdf4248" id="sec.800-ssec.3-def.petroleumtenureactivity-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">carry out an activity necessary for, or incidental to, an activity mentioned in <intref check="valid" refid="sec.800-ssec.3-def.petroleumtenureactivity-para1.a" target.guid="_cfe4f953-4924-49f8-b107-be053c4e4d73">paragraph (a)</intref> or <intref check="valid" refid="sec.800-ssec.3-def.petroleumtenureactivity-para1.b" target.guid="_6dfc3e90-11ad-4ee3-9f2b-067e224944ef">(b)</intref>.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_6acf7b1c-5dcf-471f-a0b7-d8a03ff6052a" id="sec.801" provision.type="other" spent.amends="0"><no>801</no><heading guid="_ce414651-7037-4e1d-a5c7-ff94fff9fbfd" id="sec.801-he">Petroleum producer’s measurement obligations</heading><subclause affected.by.uncommenced="0" guid="_0023f53e-8f5e-40cd-93b0-30e8bed8c8c9" id="sec.801-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A petroleum producer must ensure—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_11fcdc95-7885-4730-81a2-a1e0dcc2ad67" id="sec.801-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">each product mentioned in <intref check="valid" refid="sec.801-ssec.2" target.guid="_a30c7c2f-44e5-47bb-a142-37caa31da7c0">subsection (2)</intref> is measured by a meter, in accordance with the relevant measurement scheme for the meter; and</txt><note guid="_a4d93546-f687-488a-93cc-f049c4572602" id="sec.801-ssec.1-para1.a-note" type="example"><heading guid="_d071b442-9e15-4213-9cef-c5dcf0b312b7" id="sec.801-ssec.1-para1.a-note-he">Note—</heading><block><txt break.before="1">For measurement schemes, see <intref check="valid" refid="ch.8" target.guid="_6a18d1e2-5229-45b6-aa25-5092246a8601">chapter 8</intref>, <intref check="valid" refid="ch.8-pt.2" target.guid="_cd2436ef-9c1e-453c-84b4-86a62b9d63a0">part 2</intref> (Measurement schemes).</txt></block></note></block></li><li guid="_ccef52f0-2c42-4da9-913c-6197b4020c09" id="sec.801-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the meter complies with any requirements prescribed under a regulation; and</txt></block></li><li guid="_e29c526e-e3b8-4fe4-b173-56c1cffa4d88" id="sec.801-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the measurement is made at the times and in the way prescribed under a regulation.</txt></block></li></list></block><penalty guid="_768655ee-390f-42f7-a6c5-7a4d2aaaa62a" id="sec.801-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_a30c7c2f-44e5-47bb-a142-37caa31da7c0" id="sec.801-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.801-ssec.1" target.guid="_0023f53e-8f5e-40cd-93b0-30e8bed8c8c9">subsection (1)</intref><intref check="valid" refid="sec.801-ssec.1-para1.a" target.guid="_11fcdc95-7885-4730-81a2-a1e0dcc2ad67">(a)</intref>, the products are each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6e9cb8f6-f077-4bec-81f2-67a86a3f9be6" id="sec.801-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">petroleum the producer produces;</txt></block></li><li guid="_880ce032-549e-4e3b-959b-0f4947d26014" id="sec.801-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any of the petroleum that is used in the production of petroleum from the petroleum tenure, <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> petroleum tenure or mining tenement on which the petroleum was produced or processed;</txt></block></li><li guid="_6f49774a-4523-4b80-a46f-9b8b263fad44" id="sec.801-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">any of the petroleum produced that is flared or vented by or for the producer;</txt></block></li><li guid="_ab043485-eef5-4392-bd0f-8644a171549b" id="sec.801-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">any of the petroleum produced that the producer, or someone else for the producer, injects into a natural underground reservoir in the State;</txt></block></li><li guid="_e0c3ae7b-c3a3-4f85-91a0-5d9117bc6957" id="sec.801-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">any of the petroleum produced the property in which passes from the producer;</txt></block></li><li guid="_499de31b-de77-4e72-b179-28031689d0da" id="sec.801-ssec.2-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">for a petroleum tenure holder—associated water for the tenure;</txt></block></li><li guid="_e6a77338-ece0-4cf0-9c7d-6650f7373754" id="sec.801-ssec.2-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">any of the petroleum produced that passes through another stage in its production or processing that the Minister gives a notice to the producer is a stage at which the petroleum must be measured.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c6ca5bef-3337-4ccf-a368-5b67aa17ec1c" id="sec.801-ssec.2A" provision.type="other"><no>(2A)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.801-ssec.1" target.guid="_0023f53e-8f5e-40cd-93b0-30e8bed8c8c9">subsection (1)</intref><intref check="valid" refid="sec.801-ssec.1-para1.a" target.guid="_11fcdc95-7885-4730-81a2-a1e0dcc2ad67">(a)</intref> does not apply to an amount of petroleum that is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_058e77cb-e8c0-48d3-a59a-d6244bb5cee1" id="sec.801-ssec.2A-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">unavoidably lost before it can be measured; or</txt></block></li><li guid="_ffec98ca-708d-4a3d-8fa7-2eb14f5ea451" id="sec.801-ssec.2A-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">lost or used as part of normal operations for instrumentation, purging, blowdown or similar activities.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_82247900-0b7e-4a06-aa90-cf16ba294f89" id="sec.801-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For applying <intref check="valid" refid="sec.801-ssec.1" target.guid="_0023f53e-8f5e-40cd-93b0-30e8bed8c8c9">subsections (1)</intref> and <intref check="valid" refid="sec.801-ssec.2" target.guid="_a30c7c2f-44e5-47bb-a142-37caa31da7c0">(2)</intref><intref check="valid" refid="sec.801-ssec.2-para1.f" target.guid="_499de31b-de77-4e72-b179-28031689d0da">(f)</intref>, water is taken to be petroleum.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c714440b-08aa-48f6-b369-6ab56360ea41" id="sec.801-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If there is any inconsistency between the measurement scheme and a regulation made under <intref check="valid" refid="sec.801-ssec.1" target.guid="_0023f53e-8f5e-40cd-93b0-30e8bed8c8c9">subsection (1)</intref>, the regulation prevails to the extent of the inconsistency.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_951fb107-63e2-4a7d-88a5-e195517a9882" id="sec.802" provision.type="other" spent.amends="0"><no>802</no><heading guid="_5b1dc2d4-4493-4e86-8100-c382e633b645" id="sec.802-he">Restriction on pipeline construction or operation</heading><subclause affected.by.uncommenced="0" guid="_609295d1-c85c-4841-bdfc-81d1363ac9ed" id="sec.802-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not construct or operate a pipeline, other than a distribution pipeline or a produced water pipeline, unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_90827eed-4b5c-45e0-a2cd-829a3dc169c5" id="sec.802-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the construction or operation is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e8d4aa6e-a18d-4470-8cfa-b632eb76038c" id="sec.802-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">carried out—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_18f87326-12ff-4721-bb4c-6781e29c344f" id="sec.802-ssec.1-para1.a-para2.i-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">under this Act and under the authority of a petroleum tenure, a pipeline licence or a petroleum facility licence; or</txt></block></li><li guid="_c923532c-29a9-42ba-832f-bd5ee0f2f02b" id="sec.802-ssec.1-para1.a-para2.i-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> and under the authority of a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> petroleum tenure; or</txt></block></li><li guid="_f739f8fd-1e60-4f65-b570-244accb401df" id="sec.802-ssec.1-para1.a-para2.i-para3.C" provision.type="other"><no>(C)</no><block><txt break.before="0">under the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref> and under the authority of a GHG tenure; or</txt></block></li></list></block></li><li guid="_0fbf396b-2ee8-414d-8064-11410aad0506" id="sec.802-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">necessary to preserve life or property because of a dangerous situation or emergency that exists or may exist; or</txt></block></li></list></block></li><li guid="_a26b3391-d2a2-401e-9732-1099691621b6" id="sec.802-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the pipeline is completely within a parcel of land, or contiguous parcels of land, owned by the person; or</txt></block></li><li guid="_30130fdd-6fe7-4816-806a-473e979d78ab" id="sec.802-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the operation of the pipeline consists of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9901847e-df82-409a-87b7-274af90ea396" id="sec.802-ssec.1-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the transportation, within the area of a coal or oil shale mining lease, of coal seam gas mined in the area of the mining lease, under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.318CM" target.doc.id="act-1989-110" target.guid="_c4cd0783-ee07-423e-9341-195a04b0637e" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 318CM</legref>; or</txt></block></li><li guid="_2217de4c-8c57-4b61-a36e-bb6faf2a686c" id="sec.802-ssec.1-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the transportation, within the area of 2 or more coal mining leases that share a common boundary or are contiguous, of coal seam gas mined in the area of 1 or more of the mining leases, under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.318CM" target.doc.id="act-1989-110" target.guid="_c4cd0783-ee07-423e-9341-195a04b0637e" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 318CM</legref>; or</txt></block></li><li guid="_93df56b7-75a4-4116-8cfc-cd1af7d8878f" id="sec.802-ssec.1-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the transportation, within the area of a mining lease, of a gasification or retorting product produced under the lease.</txt></block></li></list></block></li></list></block><penalty guid="_6f2a2624-af52-42e2-88f0-8523a6de1a76" id="sec.802-ssec.1-pen"><block><txt break.before="1">Maximum penalty—2,000 penalty units.</txt></block></penalty><note guid="_a0f51557-2cfc-496d-9fb0-54d4b7d4ae8b" id="sec.802-ssec.1-note" type="example"><heading guid="_3712f71c-211d-4e4f-afde-bd64b3f06962" id="sec.802-ssec.1-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_b40c6a05-8ecf-4cca-a6f0-578d48cb4449" id="sec.802-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_c010cdca-b386-4145-b70c-fc1ff01903d5" id="sec.802-ssec.2-def.produced_"><txt break.before="1"><defterm guid="_4b10b435-ca83-4221-9d1f-4f777b1c1245" id="sec.802-ssec.2-def.produced" type="definition">produced</defterm> includes extracted, mined or released.</txt></definition><definition affected.by.uncommenced="0" guid="_449b689d-7a53-46d0-9b14-42f57d46e078" id="sec.802-ssec.2-def.producedwaterpipeline_"><txt break.before="1"><defterm guid="_836b2402-adb1-4705-afc1-524dc95653b6" id="sec.802-ssec.2-def.producedwaterpipeline" type="definition">produced water pipeline</defterm> means a pipeline for transporting produced water if the construction and operation of the pipeline is carried out under an Act other than an Act mentioned in <intref check="valid" refid="sec.802-ssec.1" target.guid="_609295d1-c85c-4841-bdfc-81d1363ac9ed">subsection (1)</intref><intref check="valid" refid="sec.802-ssec.1-para1.a" target.guid="_90827eed-4b5c-45e0-a2cd-829a3dc169c5">(a)</intref><intref check="valid" refid="sec.802-ssec.1-para1.a-para2.i" target.guid="_e8d4aa6e-a18d-4470-8cfa-b632eb76038c">(i)</intref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2c8d2aa3-d8dc-4b11-aff4-7fc962147fea" id="sec.803" provision.type="other" spent.amends="0"><no>803</no><heading guid="_330e50ff-515b-40ac-98d6-fed6ce8ad04f" id="sec.803-he">Restriction on petroleum facility construction or operation</heading><block><txt break.before="1">A person must not construct or operate a petroleum facility unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4a673ac7-3cd4-4c2b-8d5a-a65a955f2e11" id="sec.803-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the construction or operation is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b275c398-81a5-47b4-bedb-2dad8aced323" id="sec.803-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">carried out under this Act and under the authority of a petroleum authority; or</txt></block></li><li guid="_84e44040-b8ee-4f4d-b59c-8c8dfe986750" id="sec.803-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">carried out under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.318CN" target.doc.id="act-1989-110" target.guid="_a3879f50-6ebc-40cf-afe4-cd740fdd22de" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 318CN</legref> or <legref check="valid" jurisd="QLD" refid="sec.318CNA" target.doc.id="act-1989-110" target.guid="_42979194-5654-445b-b606-ae0b09b0961e" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">318CNA</legref>; or</txt></block></li><li guid="_697bdadd-f175-463f-b14f-7690d9215db5" id="sec.803-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">necessary to preserve life or property because of a dangerous situation or emergency that exists or may exist; or</txt></block></li></list></block></li><li guid="_69c7fb1c-b992-4316-8c51-b6af5ee7a75f" id="sec.803-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the petroleum facility is a facility constructed or operated under—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_39a32f45-c726-414e-9167-fe88e9083bb7" id="sec.803-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1961-003" target.version.series="73916396-889f-4008-a74f-393e76e39ff8" type="act"><name emphasis="yes">Amoco Australia Pty. Limited Agreement Act 1961</name></legref>; or</txt></block></li><li guid="_14ee373b-142e-4fe2-b6a1-d9a1007e2c8e" id="sec.803-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1964-036" target.version.series="d5a70d02-a779-48a2-b4af-595493fca218" type="act"><name emphasis="yes">Ampol Refineries Limited Agreement Act 1964</name></legref>; or</txt></block></li></list></block></li><li guid="_dc101952-b87f-4c71-ba65-309efe567f59" id="sec.803-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the petroleum facility is a facility for the distillation, processing, refining, storage or transport of petroleum authorised under a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> petroleum tenure.</txt></block></li></list></block><penalty guid="_68aa0ba9-35f9-4bef-8b61-3804946cb9dc" id="sec.803-pen"><block><txt break.before="1">Maximum penalty—2,000 penalty units.</txt></block></penalty><note guid="_b486ad59-f904-419f-ac34-be4e42b330a2" id="sec.803-note" type="example"><heading guid="_5d37b31c-2bee-49d1-978e-a91a5d6bdf6c" id="sec.803-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_deca567e-d578-4167-af38-20237b7c649b" id="sec.803-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">See however <intref check="valid" refid="sec.876" target.guid="_505d7571-6012-4dfa-aac9-9a21aca79bce">section 876</intref> (Conversion on 2004 Act start day) and the <legref check="valid" jurisd="QLD" target.doc.id="act-2003-029" target.version.series="92a3dd8a-4970-4226-b844-032b4aa4d911" type="act"><name emphasis="yes">Gas Supply Act 2003</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.257AA" target.doc.id="act-2003-029" target.guid="_6216508e-4803-4930-82d1-5fe6599b18af" target.version.series="92a3dd8a-4970-4226-b844-032b4aa4d911" type="act">section 257AA</legref> (Exemption from Petroleum and Gas (Production and Safety) Act, <intref check="valid" refid="sec.800" target.guid="_3414ab4a-2c38-4af9-b578-754022462d1e">ss 800</intref>, <intref check="valid" refid="sec.802" target.guid="_951fb107-63e2-4a7d-88a5-e195517a9882">802</intref> and <intref check="valid" refid="sec.803" target.guid="_2c8d2aa3-d8dc-4b11-aff4-7fc962147fea">803</intref> for person complying with direction).</txt></block></li><li guid="_3d3490fd-43b2-4a66-a11c-b8dc7395f19b" id="sec.803-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></li></list></block></note></clause><clause affected.by.uncommenced="0" guid="_4e15b11d-d924-4a3b-a242-713d6a864be9" id="sec.804" provision.type="other" spent.amends="0"><no>804</no><heading guid="_7811d80a-baa7-4c04-aea5-5d6e1c6f28d3" id="sec.804-he">Duty to avoid interference in carrying out authorised activities</heading><block><txt break.before="1">A person who carries out an authorised activity for a petroleum authority must carry out the activity in a way that does not unreasonably interfere with anyone else carrying out a lawful activity.</txt></block><penalty guid="_c5d6d5ad-7c3b-4ab0-a835-0c8ca6965ca6" id="sec.804-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty><note guid="_188e4cc1-b99a-4ad3-9c95-11845f46cd7b" id="sec.804-note" type="example"><heading guid="_e49c0383-9891-430b-8224-7d581ac4bf6e" id="sec.804-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></clause></part><part affected.by.uncommenced="0" guid="_ffa2fb68-a231-4ba7-b8aa-23c23fd6de99" id="ch.11-pt.2"><no>Part 2</no><heading guid="_eb3b1e2f-4845-456b-9611-1b1fdd7dba9e" id="ch.11-pt.2-he">Interference with authorised activities</heading><clause affected.by.uncommenced="0" guid="_6559e9d2-e1e0-4e35-8c27-6442dc8d6e5f" id="sec.805" provision.type="other" spent.amends="0"><no>805</no><heading guid="_cc98a044-4783-4006-9010-bd9ab516ab2c" id="sec.805-he">Obstruction of petroleum authority holder</heading><subclause affected.by.uncommenced="0" guid="_65f45142-717c-4840-8dee-28d17c455588" id="sec.805-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not, without reasonable excuse, obstruct a petroleum authority holder from—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bf6db19e-b4e1-4478-9148-fd9199892ddd" id="sec.805-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">entering or crossing land to carry out an authorised activity for the petroleum authority if the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-2014-047" target.guid="_78e7ee55-dcff-4087-b0b9-13497e839af3" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">chapter 3</legref>, <legref check="valid" jurisd="QLD" refid="ch.3-pt.2" target.doc.id="act-2014-047" target.guid="_adcc85c6-c389-49c8-b998-858dca31ac1f" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">part 2</legref> or <legref check="invalid" jurisd="QLD" type="act">3</legref>, has been complied with in relation to the entry to the extent the part is relevant; or</txt></block></li><li guid="_cc5de8c8-ede7-4a12-8495-c86e588bb2ea" id="sec.805-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">carrying out an authorised activity for the petroleum authority on the land.</txt></block></li></list></block><penalty guid="_170c827e-befa-4854-b0b1-4cb511657d16" id="sec.805-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty><note guid="_8f86c28a-c328-4e6c-b8b6-dfcb3fb03d67" id="sec.805-ssec.1-note" type="example"><heading guid="_d11bfb9e-4cff-4f67-b71e-ffe5c2b38a56" id="sec.805-ssec.1-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause><subclause affected.by.uncommenced="0" guid="_37d5a132-9736-497c-a0e1-09bdc6b187e5" id="sec.805-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If a person has obstructed a petroleum authority holder from carrying out an activity mentioned in <intref check="valid" refid="sec.805-ssec.1" target.guid="_65f45142-717c-4840-8dee-28d17c455588">subsection (1)</intref> and the holder decides to proceed with the carrying out of the activity, the holder must warn the person that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0a414ee7-f3e0-40a4-9593-41b5bfd88a22" id="sec.805-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">it is an offence to obstruct the holder unless the person has a reasonable excuse; and</txt></block></li><li guid="_999d5d35-93da-4b3e-8745-ad89a20f82a4" id="sec.805-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder considers the person’s conduct is an obstruction.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e6a0303c-d71e-4b6a-9798-805aaaf3f367" id="sec.805-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_4d8658f8-8f40-480d-8fbf-144adb27d6a8" id="sec.805-ssec.3-def.obstruct_"><txt break.before="1"><defterm guid="_30d2221e-d52b-4717-9fd9-abe98f6efa95" id="sec.805-ssec.3-def.obstruct" type="definition">obstruct</defterm> includes assault, hinder, resist and attempt or threaten to assault, hinder or resist.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c122215a-d1b8-429b-9590-2ee3b0508547" id="sec.806" provision.type="other" spent.amends="0"><no>806</no><heading guid="_1384e657-c48e-4ee1-8dda-958d7f266bc5" id="sec.806-he">Interfering with water observation bore</heading><subclause affected.by.uncommenced="0" guid="_2368ff3b-3cb3-441d-bd94-9b938ca96560" id="sec.806-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not interfere with a water observation bore unless the person is the owner of the bore or the owner of the bore consents.</txt></block><penalty guid="_8ccba650-4e8b-499e-82af-45fe10deca20" id="sec.806-ssec.1-pen"><block><txt break.before="1">Maximum penalty—1,000 penalty units.</txt></block></penalty><note guid="_9fa8924b-93a6-4225-aa4b-1ab7542baea3" id="sec.806-ssec.1-note" type="example"><heading guid="_ef4b9796-efae-4cee-aee5-0e8009cca7bb" id="sec.806-ssec.1-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_15d1de03-e972-4558-9167-acbfde923cf4" id="sec.806-ssec.1-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">For ownership of water observation bores, see <intref check="valid" refid="sec.542" target.guid="_67ab1546-3583-4a9f-9c2e-1abd93e9559b">section 542</intref>.</txt></block></li><li guid="_4bdb7602-d3d2-48fa-a27e-5375e2be011d" id="sec.806-ssec.1-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></li></list></block></note></subclause><subclause affected.by.uncommenced="0" guid="_7207a2a6-7c40-4cc5-bee2-614bc9f10321" id="sec.806-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_0e60308c-3e3c-4508-8b25-8c250f7cc368" id="sec.806-ssec.2-def.owner_"><txt break.before="1"><defterm guid="_ba412467-90e4-49a7-a386-f0ee3675bb6f" id="sec.806-ssec.2-def.owner" type="definition">owner</defterm>, of the bore, means the person who, under <intref check="valid" refid="sec.542" target.guid="_67ab1546-3583-4a9f-9c2e-1abd93e9559b">section 542</intref>, owns the works constructed in connection with the bore.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_5260fc45-d5e9-4d39-b125-a8ea137de970" id="sec.807" provision.type="other" spent.amends="0"><no>807</no><heading guid="_f906b643-0266-477d-9cce-975650bafacf" id="sec.807-he">Restriction on building on pipeline land</heading><subclause affected.by.uncommenced="0" guid="_87b7a61e-f157-4a77-ae92-3908854af49a" id="sec.807-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if land is pipeline land for 1 or more pipeline licences.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e4f6259d-fb9b-4db1-a0ab-801d929df64d" id="sec.807-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A person, other than a holder of any of the licences, must not construct or place a structure on the land unless all the pipeline licence holders consent.</txt></block><penalty guid="_16c1e912-c0a2-49ed-bb18-264a5a46c569" id="sec.807-ssec.2-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty><note guid="_9b3f088c-e0bb-44ea-a87f-5b1c4d9c0d95" id="sec.807-ssec.2-note" type="example"><heading guid="_3d983380-be02-4e4c-b618-e0fb1e31d071" id="sec.807-ssec.2-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></subclause></clause><clause affected.by.uncommenced="0" guid="_bbf139a4-9fda-4cff-b2e1-392d2a1ab5e8" id="sec.808" provision.type="other" spent.amends="0"><no>808</no><heading guid="_ae7f6731-7f06-4c1a-8994-1027361f3239" id="sec.808-he">Restriction on changing surface of pipeline land for a pipeline licence</heading><block><txt break.before="1">A person must not change the surface of pipeline land for a pipeline licence in a way that changes, or may cause a change to, the depth of burial of a pipeline unless—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_32e5da39-29b7-43f4-be33-a34e23c4f786" id="sec.808-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the pipeline licence holder consents; or</txt></block></li><li guid="_8e6ed164-afee-4ac3-a801-a98edf258ae4" id="sec.808-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the change is necessary to preserve life or property because of a dangerous situation or emergency that exists or may exist; or</txt></block></li><li guid="_3c5f034c-1294-4eae-8259-1e25bd917f94" id="sec.808-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the change is a change to a public road by or for its public road authority and the authority has complied with <intref check="valid" refid="sec.427" target.guid="_41303dc3-d05d-4bad-ae05-0de6bb636ba4">section 427</intref> in relation to the change; or</txt></block></li><li guid="_d3e4a1a9-6656-4e07-8e87-904c8e22f860" id="sec.808-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the person has a reasonable excuse.</txt></block></li></list></block><penalty guid="_920c6fea-c8a9-49fa-8fee-b6615670889b" id="sec.808-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty><note guid="_a7b67d3e-ec84-49c8-b879-37899c99c1b1" id="sec.808-note" type="example"><heading guid="_59fbc3bd-fd6a-435f-b2c5-2be177a8977f" id="sec.808-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></clause><clause affected.by.uncommenced="0" guid="_5c5f85ef-21c3-430e-9adf-0ed21a703ecf" id="sec.809" provision.type="other" spent.amends="0"><no>809</no><heading guid="_5de59ab8-3061-4790-becd-be4cc9dfefc5" id="sec.809-he">Unlawful taking of petroleum or fuel gas prohibited</heading><block><txt break.before="1">A person must not unlawfully take petroleum, fuel gas or produced water from—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_09fb3005-af4b-4f0d-b897-3f9a683206e6" id="sec.809-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a pipeline the subject of a pipeline licence; or</txt></block></li><li guid="_020960f1-0824-4ef5-b8d9-12fea467e8ac" id="sec.809-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a petroleum pipeline, as defined under <intref check="valid" refid="sec.110" target.guid="_f5c6eb9d-48d0-40de-8bca-ad56d12d0147">section 110</intref>, operated under that section by a petroleum lease holder; or</txt></block></li><li guid="_a46f55b1-93fa-4173-a8a3-68193c9a849d" id="sec.809-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a gas fitting.</txt></block></li></list></block><penalty guid="_048281e5-bff5-41ec-abed-99bd2044549f" id="sec.809-pen"><block><txt break.before="1">Maximum penalty—1,500 penalty units.</txt></block></penalty><note guid="_31ffa8d6-b8c2-4f84-88ef-cee905560fcb" id="sec.809-note" type="example"><heading guid="_80a4c061-d350-4f25-8852-cee98ab766cc" id="sec.809-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></clause><clause affected.by.uncommenced="0" guid="_a85d2517-d9bd-4100-b480-ac508cd6276c" id="sec.810" provision.type="other" spent.amends="0"><no>810</no><heading guid="_c17ac2da-f23e-4ed6-b42a-7fa7ac3c5d19" id="sec.810-he">Restriction on building on petroleum facility land</heading><block><txt break.before="1">A person must not construct or place a structure on petroleum facility land for a petroleum facility licence unless the petroleum facility licence holder consents.</txt></block><penalty guid="_fec53f96-2ee9-480a-bc0a-c5b94fe4b3ab" id="sec.810-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty><note guid="_0e697ce3-6ab7-4e18-8047-3a5e20a96445" id="sec.810-note" type="example"><heading guid="_b90f53e3-bfe2-4f48-a136-860fd307b5cd" id="sec.810-note-he">Note—</heading><block><txt break.before="1">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></note></clause></part><part affected.by.uncommenced="0" guid="_f73f2e2d-3720-4591-9891-4c363fdd921b" id="ch.11-pt.3"><no>Part 3</no><heading guid="_d60137bf-9398-4950-800f-08089c76ca2b" id="ch.11-pt.3-he">Other offences</heading><clause affected.by.uncommenced="0" guid="_a6f611c7-42a4-4f7c-aaaa-570ff8bbf3f7" id="sec.811" provision.type="other" spent.amends="0"><no>811</no><heading guid="_73caffd8-4edf-4a2a-901e-c22d72fe89bb" id="sec.811-he">Obstruction of inspector or authorised officer</heading><subclause affected.by.uncommenced="0" guid="_f043a1a9-131f-4c67-a569-e4b96c20cc53" id="sec.811-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not, without reasonable excuse, obstruct an inspector or authorised officer exercising a power under this Act.</txt></block><penalty guid="_27ecd8c7-0aca-4ebd-8893-20f74827e6f4" id="sec.811-ssec.1-pen"><block><txt break.before="1">Maximum penalty—500 penalty units.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_fa009f4f-5329-45be-9ddb-301a14758809" id="sec.811-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the inspector or authorised officer considers a person has obstructed the inspector or authorised officer and the inspector or authorised officer decides to proceed with the exercise of the power, the inspector or authorised officer must warn the person that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_daa2e147-bf5d-4c67-8b95-0dbabccc1dcf" id="sec.811-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">it is an offence to obstruct the inspector or authorised officer unless the person has a reasonable excuse; and</txt></block></li><li guid="_7a2f5f67-663d-4dce-a5b2-bde1a68d7c55" id="sec.811-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the inspector or authorised officer considers the person’s conduct is an obstruction.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_00a825f5-211a-41f1-bbf8-b07a353e7c16" id="sec.811-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_8e8f6009-1990-4355-ad4c-d3746da2a952" id="sec.811-ssec.3-def.obstruct_"><txt break.before="1"><defterm guid="_7200dee9-04a2-46a8-bccb-1bdfe0d63994" id="sec.811-ssec.3-def.obstruct" type="definition">obstruct</defterm> includes assault, hinder, resist and attempt or threaten to assault, hinder or resist.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a23431a8-7d3e-46a1-99e6-d784608341c8" id="sec.812" provision.type="other" spent.amends="0"><no>812</no><heading guid="_681e8b3c-aeab-4a47-9fe9-6276765b0089" id="sec.812-he">Pretending to be inspector or authorised officer</heading><block><txt break.before="1">A person must not pretend to be an inspector or authorised officer.</txt></block><penalty guid="_e80c3bc6-9728-4906-b9bd-a905fe1fd2e2" id="sec.812-pen"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></clause><clause affected.by.uncommenced="0" guid="_112ed3e9-ee94-459d-8e89-dfa7e7622164" id="sec.813" provision.type="other" spent.amends="0"><no>813</no><heading guid="_3a1cef45-11fd-4495-8407-36a4a6759385" id="sec.813-he">False or misleading documents or statements</heading><subclause affected.by.uncommenced="0" guid="_ee95baec-6383-4151-8e3e-9533e99ab8f8" id="sec.813-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not make an entry in a document required to be made, adopted, held or kept under this Act knowing the entry is false or misleading in a material particular.</txt><penalty guid="_595d7053-3e5a-43b0-a69f-d1df138d968e" id="sec.813-ssec.1-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty><note guid="_079b3303-f9ce-47bf-b484-24ff38a6908b" id="sec.813-ssec.1-note" type="example"><heading guid="_b11b9049-165d-49b8-9e4f-6adbd3a77cb8" id="sec.813-ssec.1-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_7a44cfb3-1907-484a-a366-68737059a85f" id="sec.813-ssec.1-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">This provision is an executive liability provision—see <intref check="valid" refid="sec.814" target.guid="_9fa8e8a1-4511-4ac6-b2de-5b287f47ce16">section 814</intref>.</txt></block></li><li guid="_d5716e46-d4cb-4487-905d-34d389a550fc" id="sec.813-ssec.1-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></li></list></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_b8d8437c-6907-46ab-bb0a-cd9148491cbc" id="sec.813-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A person must not state anything to an <ins xml:space="preserve">inspector or </ins>authorised officer that the person knows is false or misleading in a material particular.</txt></block><penalty guid="_99dee928-582f-4505-a5e3-44dc004d6055" id="sec.813-ssec.2-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty><note guid="_b49c62ac-ea77-4570-95ca-0e14919dff47" id="sec.813-ssec.2-note" type="example"><heading guid="_4ea409be-9951-4423-ac84-684ae545ccb7" id="sec.813-ssec.2-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_cd4bde69-fe7a-4feb-93e5-937d5d039563" id="sec.813-ssec.2-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">This provision is an executive liability provision—see <intref check="valid" refid="sec.814" target.guid="_9fa8e8a1-4511-4ac6-b2de-5b287f47ce16">section 814</intref>.</txt></block></li><li guid="_fedc149d-6f3d-4b6d-8ccd-8e4d40aa47f5" id="sec.813-ssec.2-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></li></list></block></note></subclause><subclause affected.by.uncommenced="0" guid="_a81077c6-51e5-463d-87b4-c6ea11433493" id="sec.813-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A person must not, in relation to the administration of this Act, give to an <ins xml:space="preserve">inspector or </ins>authorised officer a document that the person knows to be false or misleading in a material particular.</txt></block><penalty guid="_89806050-ec09-4a5d-8b71-6953a9e36924" id="sec.813-ssec.3-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty><note guid="_2411b1df-f504-466a-8e7b-ab6d67a303f1" id="sec.813-ssec.3-note" type="example"><heading guid="_fa27f250-2540-4050-af9d-481c3ce44c04" id="sec.813-ssec.3-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_dae9a2de-1703-4376-9e97-d15f0d8da64a" id="sec.813-ssec.3-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">This provision is an executive liability provision—see <intref check="valid" refid="sec.814" target.guid="_9fa8e8a1-4511-4ac6-b2de-5b287f47ce16">section 814</intref>.</txt></block></li><li guid="_f41f37a5-c40b-41c8-a13d-99681d13625e" id="sec.813-ssec.3-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">If a corporation commits an offence against this provision, an executive officer of the corporation may be taken, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, to have also committed the offence.</txt></block></li></list></block></note></subclause><subclause affected.by.uncommenced="0" guid="_d307e29a-77e3-4413-98db-bca1fbf1bd48" id="sec.813-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0"><intref check="valid" refid="sec.813-ssec.3" target.guid="_a81077c6-51e5-463d-87b4-c6ea11433493">Subsection (3)</intref> applies to a document given in relation to the administration of this Act whether or not the document was given in response to a specific power under this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_58faf19e-05b1-4014-83fd-d4073431d61a" id="sec.813-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0"><intref check="valid" refid="sec.813-ssec.3" target.guid="_a81077c6-51e5-463d-87b4-c6ea11433493">Subsection (3)</intref> does not apply to a person if the person, when giving the document—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f2badfd7-30ce-44b1-b952-60f851da1eb6" id="sec.813-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">tells the <ins xml:space="preserve">inspector or </ins>authorised officer, to the best of the person’s ability, how the document is false or misleading; and</txt></block></li><li guid="_f670dd5e-02e3-49bf-8716-61b2edf6b0e0" id="sec.813-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the person has, or can reasonably obtain, the correct information—gives the correct information.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_4fe62188-50f7-482d-a1b2-7f5a3d0d1760" id="sec.813-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">This section does not apply to a person for an act or omission of the person if <intref check="valid" refid="sec.606" target.guid="_9a03a570-6e07-483a-b4ea-7dd1478d8102">section 606</intref> or <intref check="valid" refid="sec.607" target.guid="_736b984d-bcab-43de-81cf-b35dc1c21862">607</intref> applies to the person for the act or omission.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_9fa8e8a1-4511-4ac6-b2de-5b287f47ce16" id="sec.814" provision.type="other" spent.amends="0"><no>814</no><heading guid="_48e713af-8d84-44cb-84a0-968d5a4b8434" id="sec.814-he">Liability of executive officer—particular offences committed by corporation</heading><subclause affected.by.uncommenced="0" guid="_460a87df-4de9-498c-bc58-cee8b7f136d3" id="sec.814-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An executive officer of a corporation commits an offence if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3c3d4705-3847-46dd-969a-abc25330fb6d" id="sec.814-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the corporation commits an offence against an executive liability provision; and</txt></block></li><li guid="_8d5367ab-b419-4dcf-8e58-599c11e03fe2" id="sec.814-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the officer did not take all reasonable steps to ensure the corporation did not engage in the conduct constituting the offence.</txt></block></li></list></block><penalty guid="_2d2bfb92-25d7-4b22-968c-fd64e452a681" id="sec.814-ssec.1-pen"><block><txt break.before="1">Maximum penalty—the penalty for a contravention of the executive liability provision by an individual.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_ce577c52-75c3-47d5-985a-08ed5a71f187" id="sec.814-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In deciding whether things done or omitted to be done by the executive officer constitute reasonable steps for <intref check="valid" refid="sec.814-ssec.1" target.guid="_460a87df-4de9-498c-bc58-cee8b7f136d3">subsection (1)</intref><intref check="valid" refid="sec.814-ssec.1-para1.b" target.guid="_8d5367ab-b419-4dcf-8e58-599c11e03fe2">(b)</intref>, a court must have regard to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d78b6434-7da8-4bf9-a58e-dba2dd02eceb" id="sec.814-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">whether the officer knew, or ought reasonably to have known, of the corporation’s conduct constituting the offence against the executive liability provision; and</txt></block></li><li guid="_47bcf9af-c3c2-4c9d-9e13-94f07cdd7f77" id="sec.814-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether the officer was in a position to influence the corporation’s conduct in relation to the offence against the executive liability provision; and</txt></block></li><li guid="_e0a68ce6-9e4c-4e2f-868c-90c300d42f58" id="sec.814-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">any other relevant matter.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_58a57589-5315-4a15-a6a0-cbb386fecb41" id="sec.814-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The executive officer may be proceeded against for, and convicted of, an offence against <intref check="valid" refid="sec.814-ssec.1" target.guid="_460a87df-4de9-498c-bc58-cee8b7f136d3">subsection (1)</intref> whether or not the corporation has been proceeded against for, or convicted of, the offence against the executive liability provision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5171c094-6c82-4904-a9b3-b035422de07f" id="sec.814-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">This section does not affect any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7a1e44cb-23c4-4a37-865b-a6b9c46786c6" id="sec.814-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the liability of the corporation for the offence against the executive liability provision;</txt></block></li><li guid="_615720f5-1fd5-492a-8c58-b613fb7b2aa4" id="sec.814-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the liability, under <intref check="valid" refid="sec.814A" target.guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b">section 814A</intref>, of the executive officer for the offence against the executive liability provision;</txt></block></li><li guid="_c071c284-e6ed-4c87-8b32-29c7023f44a2" id="sec.814-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the liability, under the <legref check="valid" jurisd="QLD" target.doc.id="act-1899-009" target.version.series="19dc3aee-7313-4ba8-a7f6-7abf0c19b425" type="act"><name emphasis="no">Criminal Code</name></legref>, <legref check="invalid" jurisd="QLD" refid="ch.2" target.doc.id="act-1899-009" target.version.series="19dc3aee-7313-4ba8-a7f6-7abf0c19b425" type="act">chapter 2</legref>, of any person, whether or not the person is an executive officer of the corporation, for the offence against the executive liability provision.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a14f4a6c-291c-48c5-bb29-4284e51bf95d" id="sec.814-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_d8fc9049-b802-4ace-9c14-18dfbba69d21" id="sec.814-ssec.5-def.executiveliabilityprovision_"><txt break.before="1"><defterm guid="_e5373cca-714c-4375-bf03-be5df15ca9c7" id="sec.814-ssec.5-def.executiveliabilityprovision" type="definition">executive liability provision</defterm> means any of the following provisions—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3069c51e-7897-4ebc-9e12-7b4da1e4b679" id="sec.814-ssec.5-def.executiveliabilityprovision-para1" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="sec.604F" target.guid="_f9481c95-c8fc-4338-81cb-6152f1a10768">section 604F</intref><intref check="valid" refid="sec.604F-ssec.1" target.guid="_8da62b4e-bea8-4f01-ba86-6b0ac0953dee">(1)</intref></txt></block></li><li guid="_a14c93e9-3c2b-4f80-97d9-9d579fc6520c" id="sec.814-ssec.5-def.executiveliabilityprovision-para1-oc.2" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="sec.605" target.guid="_1995a4d0-b996-44ba-beeb-2ac1ae20e2dd">section 605</intref><intref check="valid" refid="sec.605-ssec.1" target.guid="_06cafdac-cbfd-4a79-bc56-d838329eb3a7">(1)</intref></txt></block></li><li guid="_1f2a64d8-c265-4fa4-aedc-d097479c7817" id="sec.814-ssec.5-def.executiveliabilityprovision-para1-oc.3" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="sec.606" target.guid="_9a03a570-6e07-483a-b4ea-7dd1478d8102">section 606</intref><intref check="valid" refid="sec.606-ssec.1" target.guid="_85130877-61ba-4a59-92e1-3da027887db7">(1)</intref></txt></block></li><li guid="_dd58f5ee-c4df-49e0-8b4c-412a12f12073" id="sec.814-ssec.5-def.executiveliabilityprovision-para1-oc.4" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="sec.607" target.guid="_736b984d-bcab-43de-81cf-b35dc1c21862">section 607</intref><intref check="invalid" refid="sec.607-ssec.1">(1)</intref></txt></block></li><li guid="_725c9e55-577c-4e4a-8fc9-187b621c86eb" id="sec.814-ssec.5-def.executiveliabilityprovision-para1-oc.5" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="sec.617C" target.guid="_ba8bac6d-4c2e-442a-912c-ba64bb383ca9">section 617C</intref><intref check="valid" refid="sec.617C-ssec.1" target.guid="_5eb22fb1-ab1c-4fe8-9734-f282e3645a32">(1)</intref></txt></block></li><li guid="_9c2817d2-1711-4804-8436-575f9ccab73e" id="sec.814-ssec.5-def.executiveliabilityprovision-para1-oc.6" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="sec.696" target.guid="_1c3744b9-a825-4174-8c20-16a5898c9e3b">section 696</intref><intref check="valid" refid="sec.696-ssec.2" target.guid="_9543b3d5-f23b-4bf2-bc7c-cd97d222bff9">(2)</intref></txt></block></li><li guid="_ff5aabff-7c66-4036-b6ca-a185ef2508f8" id="sec.814-ssec.5-def.executiveliabilityprovision-para1-oc.7" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="sec.696" target.guid="_1c3744b9-a825-4174-8c20-16a5898c9e3b">section 696</intref><intref check="valid" refid="sec.696-ssec.3" target.guid="_5762640d-39f4-4d3c-8a60-a9e0b1c3b652">(3)</intref></txt></block></li><li change="insReplace" guid="_76ee7518-5158-45d4-b2b5-3c2dfc3d5b0b" id="sec.814-ssec.5-def.executiveliabilityprovision-para1-oc.8" provision.type="other"><no>•</no><block><txt break.before="0">section 731AA(1)</txt></block></li><li change="delReplace" guid="_8967b36f-55c9-47ad-be22-ac228835724c-del" id="sec.814-ssec.5-def.executiveliabilityprovision-para1-oc.8-del" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="sec.733" target.guid="_f1623434-293e-4b90-bef4-22f13c5b2bf4">section 733</intref><intref check="valid" refid="sec.733-ssec.1" target.guid="_302dbbae-28dc-4d16-afac-66d06d6ed204">(1)</intref></txt></block></li><li guid="_31de2264-1916-421b-8b89-a5662b84dcea" id="sec.814-ssec.5-def.executiveliabilityprovision-para1-oc.9" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="sec.800" target.guid="_3414ab4a-2c38-4af9-b578-754022462d1e">section 800</intref><intref check="valid" refid="sec.800-ssec.1" target.guid="_7892f44a-995e-4ea1-ac7d-560e09a56d2a">(1)</intref></txt></block></li><li guid="_4943bfcd-05fe-42a7-81af-52f9a64f4ae4" id="sec.814-ssec.5-def.executiveliabilityprovision-para1-oc.10" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="sec.813" target.guid="_112ed3e9-ee94-459d-8e89-dfa7e7622164">section 813</intref><intref check="valid" refid="sec.813-ssec.1" target.guid="_ee95baec-6383-4151-8e3e-9533e99ab8f8">(1)</intref></txt></block></li><li guid="_3d4cf199-ad25-4d03-a88b-b128c0548eac" id="sec.814-ssec.5-def.executiveliabilityprovision-para1-oc.11" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="sec.813" target.guid="_112ed3e9-ee94-459d-8e89-dfa7e7622164">section 813</intref><intref check="valid" refid="sec.813-ssec.2" target.guid="_b8d8437c-6907-46ab-bb0a-cd9148491cbc">(2)</intref></txt></block></li><li guid="_7736329e-8929-4b2d-b441-4e34649a93e8" id="sec.814-ssec.5-def.executiveliabilityprovision-para1-oc.12" provision.type="other"><no>•</no><block><txt break.before="0"><intref check="valid" refid="sec.813" target.guid="_112ed3e9-ee94-459d-8e89-dfa7e7622164">section 813</intref><intref check="valid" refid="sec.813-ssec.3" target.guid="_a81077c6-51e5-463d-87b4-c6ea11433493">(3)</intref>.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d1cadd49-7637-486b-9d3e-e2c277ce3d5b" id="sec.814A" provision.type="other" spent.amends="0"><no>814A</no><heading guid="_42f3b250-d140-48c0-beac-994eec9a2092" id="sec.814A-he">Executive officer may be taken to have committed offence</heading><subclause affected.by.uncommenced="0" guid="_90ce01a8-807d-45a0-aaef-dbb9fee0ce7d" id="sec.814A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a corporation commits an offence against a deemed executive liability provision, each executive officer of the corporation is taken to have also committed the offence if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_448bf756-38aa-4597-b8a9-54fd1b84cbe8" id="sec.814A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the officer authorised or permitted the corporation’s conduct constituting the offence; or</txt></block></li><li guid="_3fbba02b-9f93-4a9d-8afa-18819547066d" id="sec.814A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the officer was, directly or indirectly, knowingly concerned in the corporation’s conduct.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0ea87a9d-7dd1-417a-bd58-dbf2b752d6ff" id="sec.814A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The executive officer may be proceeded against for, and convicted of, the offence against the deemed executive liability provision whether or not the corporation has been proceeded against for, or convicted of, the offence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b5b43020-cbd5-4145-ae77-88fe57f0fe1e" id="sec.814A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">This section does not affect either of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fa441ff3-0f9d-4e94-932a-0629c552bde1" id="sec.814A-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the liability of the corporation for the offence against the deemed executive liability provision;</txt></block></li><li guid="_05c5d64a-ab0d-414b-b49e-6217f71ad8c6" id="sec.814A-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the liability, under the <legref check="valid" jurisd="QLD" target.doc.id="act-1899-009" target.version.series="19dc3aee-7313-4ba8-a7f6-7abf0c19b425" type="act"><name emphasis="no">Criminal Code</name></legref>, <legref check="invalid" jurisd="QLD" refid="ch.2" target.doc.id="act-1899-009" target.version.series="19dc3aee-7313-4ba8-a7f6-7abf0c19b425" type="act">chapter 2</legref>, of any person, whether or not the person is an executive officer of the corporation, for the offence against the deemed executive liability provision.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c03fdff0-70b0-47fa-b2ec-ac1c6b7e3251" id="sec.814A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, this section does not apply to the corporation’s offence to the extent it involves a contravention relating to a petroleum royalty.</txt><note guid="_b423d460-64d1-4019-9c48-0fe214c665cc" id="sec.814A-ssec.4-note" type="example"><heading guid="_962f6ca0-6752-40a2-818c-6542cd299146" id="sec.814A-ssec.4-note-he">Example for <intref check="valid" refid="sec.814A-ssec.4" target.guid="_c03fdff0-70b0-47fa-b2ec-ac1c6b7e3251">subsection (4)</intref>—</heading><block><txt break.before="1">a royalty return lodged by the corporation contains an entry that is known to be false or misleading in a material particular</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_fcc5ee6f-f0c3-411c-8dff-d4a09cbd5514" id="sec.814A-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_0301ab53-453d-4b0c-8948-dda38e7a20c0" id="sec.814A-ssec.5-def.deemedexecutiveliabilityprovision_"><txt break.before="1"><defterm guid="_1153f66b-4343-48c8-9132-a2804a1051c8" id="sec.814A-ssec.5-def.deemedexecutiveliabilityprovision" type="definition">deemed executive liability provision</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2ce34ba8-a3af-4639-8bca-b996da031468" id="sec.814A-ssec.5-def.deemedexecutiveliabilityprovision-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0"><intref check="valid" refid="sec.175C" target.guid="_71193651-0bf7-41be-b25c-f18f55c20ec4">sections 175C</intref><intref check="valid" refid="sec.175C-ssec.1" target.guid="_9fcfc1c8-26f3-4046-94d2-639f52b30f57">(1)</intref>, <intref check="valid" refid="sec.175C" target.guid="_71193651-0bf7-41be-b25c-f18f55c20ec4">175C</intref><intref check="valid" refid="sec.175C-ssec.3" target.guid="_1eae2717-e14d-407b-9a66-dd25ee855253">(3)</intref>, <intref check="valid" refid="sec.175H" target.guid="_ea671f09-a809-40f1-8b0a-43e5f2c393b8">175H</intref><intref check="valid" refid="sec.175H-ssec.2" target.guid="_19e90e77-032c-4666-99a8-0ea8baa1cd20">(2)</intref>, <intref check="valid" refid="sec.175H" target.guid="_ea671f09-a809-40f1-8b0a-43e5f2c393b8">175H</intref><intref check="valid" refid="sec.175H-ssec.3" target.guid="_7647d2d9-6b6d-4e57-bcca-43b83d306e91">(3)</intref>, <intref check="valid" refid="sec.198" target.guid="_df9161e4-9878-49ee-8a81-564a52933c20">198</intref>, <intref check="valid" refid="sec.207" target.guid="_7ad88bac-cab2-45e2-a1cf-5a26f48658c6">207</intref>, <intref check="valid" refid="sec.228" target.guid="_6711051f-1098-4c0c-b996-b5b5e3691033">228</intref><intref check="valid" refid="sec.228-ssec.1" target.guid="_31ccb24f-11d3-4314-a30d-2edc47cc0c15">(1)</intref>, <intref check="valid" refid="sec.281" target.guid="_89c0646e-cdd3-4147-bd83-94905eefb0c7">281</intref><intref check="valid" refid="sec.281-ssec.1" target.guid="_605bf940-bb5b-472f-b4ef-3698ac4acb20">(1)</intref>, <intref check="valid" refid="sec.282" target.guid="_6ddcb103-3b1d-4ab1-9067-cb649637d171">282</intref>, <intref check="valid" refid="sec.283" target.guid="_647e9706-2b27-4784-b095-6bce86130bc5">283</intref>, <intref check="valid" refid="sec.292" target.guid="_21940938-f87d-4dd6-9453-0c2e8fab326c">292</intref><intref check="valid" refid="sec.292-ssec.2" target.guid="_bd8f0cfd-c095-4717-ae2a-265c01d499a9">(2)</intref>, <intref check="valid" refid="sec.559" target.guid="_12ade87e-2fc7-4058-a699-e18c71c46118">559</intref><intref check="valid" refid="sec.559-ssec.1" target.guid="_b9390c52-8543-49f8-9d60-e047fbe67862">(1)</intref>, <intref check="valid" refid="sec.560" target.guid="_8e09f8ba-7d82-4d71-9ec8-1aaa3450a8cc">560</intref><intref check="valid" refid="sec.560-ssec.3" target.guid="_a8bfddd0-cf5e-443a-8aab-aac38ae74764">(3)</intref>, <intref check="valid" refid="sec.621" target.guid="_ed66b462-49ee-4ff9-9763-fe06935ddb9b">621</intref><intref check="valid" refid="sec.621-ssec.2" target.guid="_0592e9c8-e90b-41fe-9eb0-33dace78ca6d">(2)</intref>, <intref check="valid" refid="sec.626" target.guid="_f2a9e253-a661-418b-86e7-3b6512a0a921">626</intref><intref check="valid" refid="sec.626-ssec.1" target.guid="_5439e4fb-9511-4b03-b775-b7bcb0157ef2">(1)</intref>, <intref check="valid" refid="sec.628" target.guid="_a9123117-fe35-41d1-af6b-85de042a0cf9">628</intref><intref check="valid" refid="sec.628-ssec.1" target.guid="_fcd6c26b-fab5-48d2-a513-ab62da8a96a0">(1)</intref>, <intref check="valid" refid="sec.639" target.guid="_c691cdfd-1dee-42a9-a295-4df6447adbc1">639</intref><intref check="valid" refid="sec.639-ssec.1" target.guid="_8563259e-82f5-48d5-9b59-40d23fbb08a6">(1)</intref>, <intref check="valid" refid="sec.640" target.guid="_b7eebef1-86ec-4768-bd25-d4bd073f37a1">640</intref>, <intref check="valid" refid="sec.642" target.guid="_0164ac4d-aa3d-43f5-b732-3a45abb16d24">642</intref><intref check="valid" refid="sec.642-ssec.1" target.guid="_da10ea12-82e8-4f09-9b71-8d8c9d53aef2">(1)</intref>, <intref check="valid" refid="sec.643" target.guid="_9fec020e-72db-4931-9e75-92534f5b22f3">643</intref><intref check="valid" refid="sec.643-ssec.3" target.guid="_7b84a5c6-53ba-4c25-95bb-9b198369c5f1">(3)</intref>, <intref check="valid" refid="sec.646" target.guid="_698add4a-2428-4150-82e6-0d08b852cefc">646</intref><intref check="valid" refid="sec.646-ssec.4" target.guid="_6cf82131-fe14-4b33-94f7-7785e5c21155">(4)</intref>, <intref check="valid" refid="sec.648" target.guid="_47c7731e-8707-4e00-8e46-96162e9fc2f1">648</intref><intref check="valid" refid="sec.648-ssec.1" target.guid="_24b1315f-d018-4ada-9c54-9279934eafc5">(1)</intref>, <intref check="valid" refid="sec.648" target.guid="_47c7731e-8707-4e00-8e46-96162e9fc2f1">648</intref><intref check="valid" refid="sec.648-ssec.2" target.guid="_0c1135e1-4f74-4297-a12a-75439c18c7c0">(2)</intref>, <intref check="valid" refid="sec.649" target.guid="_3cfaeade-df7f-4cf5-909e-0468ceb10f65">649</intref>, <intref check="valid" refid="sec.697" target.guid="_b7819e86-642b-4170-a5cb-4dd329e3e907">697</intref><intref check="valid" refid="sec.697-ssec.1" target.guid="_24d78489-6e4e-4f72-8bf8-51952a25e20f">(1)</intref>, <intref check="valid" refid="sec.697" target.guid="_b7819e86-642b-4170-a5cb-4dd329e3e907">697</intref><intref check="valid" refid="sec.697-ssec.2" target.guid="_ca16e3d2-7d44-4207-8438-e05279bc37c2">(2)</intref>, <intref check="valid" refid="sec.697" target.guid="_b7819e86-642b-4170-a5cb-4dd329e3e907">697</intref><intref check="valid" refid="sec.697-ssec.3" target.guid="_7420830b-ab8f-4983-afda-affd2463da28">(3)</intref>, <intref check="valid" refid="sec.708A" target.guid="_66cb4510-4f0b-4e37-ae80-645da0b5cfe8">708A</intref><intref check="valid" refid="sec.708A-ssec.1" target.guid="_4311d67f-d03d-48a6-8899-cab192b92929">(1)</intref>, <intref check="valid" refid="sec.721" target.guid="_2cde7abd-34a7-4693-a988-98af88234def">721</intref><intref check="valid" refid="sec.721-ssec.1" target.guid="_9bf99a40-ce4a-4297-becb-47dfad5ca43b">(1)</intref>, <intref check="valid" refid="sec.721" target.guid="_2cde7abd-34a7-4693-a988-98af88234def">721</intref><intref check="valid" refid="sec.721-ssec.2" target.guid="_f344a215-36da-4016-8c65-9d19188d828e">(2)</intref>, <intref check="valid" refid="sec.727" target.guid="_54e80355-83dc-4c4b-ad39-726ca3e8d159">727</intref><intref check="valid" refid="sec.727-ssec.1" target.guid="_c260fac7-ae9f-4b7f-a000-1d2266ea3276">(1)</intref>, <intref check="valid" refid="sec.727" target.guid="_54e80355-83dc-4c4b-ad39-726ca3e8d159">727</intref><intref check="valid" refid="sec.727-ssec.4" target.guid="_9d20f445-0a78-4d15-9627-b88669222e8f">(4)</intref>, <intref check="valid" refid="sec.729" target.guid="_4ff3dc8d-473a-44e9-9aed-2d3c7528b4d9">729</intref>, <del xml:space="preserve"><intref check="valid" refid="sec.733" target.guid="_f1623434-293e-4b90-bef4-22f13c5b2bf4">733</intref></del><ins xml:space="preserve">731AA</ins>(2)<ins xml:space="preserve">, 731AG</ins>, <intref check="valid" refid="sec.733A" target.guid="_393a3a83-688a-4f3c-b5ff-dc8b2903cc96">733A</intref>, <intref check="valid" refid="sec.734" target.guid="_03eaca55-5625-4b02-8f0c-4acea364ae57">734</intref><intref check="valid" refid="sec.734-ssec.1" target.guid="_8d5fdb08-58f0-41ec-9172-4f49a62b39cd">(1)</intref>, <intref check="valid" refid="sec.734" target.guid="_03eaca55-5625-4b02-8f0c-4acea364ae57">734</intref><intref check="valid" refid="sec.734-ssec.3" target.guid="_523d89d3-fa51-4def-988a-cbcc4af5f2fe">(3)</intref>, <intref check="valid" refid="sec.766" target.guid="_58b3e990-df96-41ab-8db9-955eeb130b48">766</intref>, <intref check="valid" refid="sec.782" target.guid="_f7a791d5-519c-4f52-9806-903451ce372e">782</intref><intref check="valid" refid="sec.782-ssec.1" target.guid="_cc603be6-4dc3-46e7-b686-b69e0959feec">(1)</intref>, <intref check="valid" refid="sec.785" target.guid="_bcc62bf7-4b55-4d84-ad97-eed1c7a46e4c">785</intref>, <intref check="valid" refid="sec.802" target.guid="_951fb107-63e2-4a7d-88a5-e195517a9882">802</intref><intref check="valid" refid="sec.802-ssec.1" target.guid="_609295d1-c85c-4841-bdfc-81d1363ac9ed">(1)</intref>, <intref check="valid" refid="sec.803" target.guid="_2c8d2aa3-d8dc-4b11-aff4-7fc962147fea">803</intref>, <intref check="valid" refid="sec.804" target.guid="_4e15b11d-d924-4a3b-a242-713d6a864be9">804</intref>, <intref check="valid" refid="sec.805" target.guid="_6559e9d2-e1e0-4e35-8c27-6442dc8d6e5f">805</intref><intref check="valid" refid="sec.805-ssec.1" target.guid="_65f45142-717c-4840-8dee-28d17c455588">(1)</intref>, <intref check="valid" refid="sec.806" target.guid="_c122215a-d1b8-429b-9590-2ee3b0508547">806</intref><intref check="valid" refid="sec.806-ssec.1" target.guid="_2368ff3b-3cb3-441d-bd94-9b938ca96560">(1)</intref>, <intref check="valid" refid="sec.807" target.guid="_5260fc45-d5e9-4d39-b125-a8ea137de970">807</intref><intref check="valid" refid="sec.807-ssec.2" target.guid="_e4f6259d-fb9b-4db1-a0ab-801d929df64d">(2)</intref>, <intref check="valid" refid="sec.808" target.guid="_bbf139a4-9fda-4cff-b2e1-392d2a1ab5e8">808</intref>, <intref check="valid" refid="sec.809" target.guid="_5c5f85ef-21c3-430e-9adf-0ed21a703ecf">809</intref>, <intref check="valid" refid="sec.810" target.guid="_a85d2517-d9bd-4100-b480-ac508cd6276c">810</intref>, <intref check="valid" refid="sec.813" target.guid="_112ed3e9-ee94-459d-8e89-dfa7e7622164">813</intref><intref check="valid" refid="sec.813-ssec.1" target.guid="_ee95baec-6383-4151-8e3e-9533e99ab8f8">(1)</intref>, <intref check="valid" refid="sec.813" target.guid="_112ed3e9-ee94-459d-8e89-dfa7e7622164">813</intref><intref check="valid" refid="sec.813-ssec.2" target.guid="_b8d8437c-6907-46ab-bb0a-cd9148491cbc">(2)</intref> or <intref check="valid" refid="sec.813" target.guid="_112ed3e9-ee94-459d-8e89-dfa7e7622164">813</intref><intref check="valid" refid="sec.813-ssec.3" target.guid="_a81077c6-51e5-463d-87b4-c6ea11433493">(3)</intref>; or</txt></block></li><li guid="_ce77963f-0227-43a6-8098-1e814f9fb074" id="sec.814A-ssec.5-def.deemedexecutiveliabilityprovision-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.39" target.doc.id="act-2014-047" target.guid="_804979b7-866c-4941-9170-4b3e8302ce59" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">section 39</legref><legref check="invalid" jurisd="QLD" type="act">(1)</legref> or <legref check="valid" jurisd="QLD" refid="sec.43" target.doc.id="act-2014-047" target.guid="_12ba7b07-552a-4e0b-81c4-5f9ddccfaec6" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">43</legref><legref check="invalid" jurisd="QLD" type="act">(1)</legref>.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f3b75739-45e5-4cbb-bc22-ae88426eb88b" id="sec.815" provision.type="other" spent.amends="0"><no>815</no><heading guid="_c4d9bf39-d278-4b78-9d7d-c5d42b104fe4" id="sec.815-he">Fuel gas suppliers must not use other supplier’s containers</heading><subclause affected.by.uncommenced="0" guid="_6241c6db-9e4e-4b7c-a0ae-127b55d0ed6a" id="sec.815-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to a container with a water capacity of more than 25kg that is the property of a fuel gas supplier (the <defterm guid="_dda7e7ce-ed4b-4960-b176-e6ecbca4803f" id="sec.815-def.owner" type="definition">owner</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1494db83-1b0f-49a6-8eec-37aba956d845" id="sec.815-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Another fuel gas supplier must not supply LPG in the container without the owner’s permission.</txt></block><penalty guid="_ef998f69-5f42-4be9-b1df-0121fde79a4f" id="sec.815-ssec.2-pen"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></subclause></clause><clause affected.by.uncommenced="0" guid="_d6883f54-1f09-4ea2-8d80-e8869b37a7d2" id="sec.816" provision.type="other" spent.amends="0"><no>816</no><heading guid="_d4015d94-4109-4f7b-805a-36b20041c907" id="sec.816-he">Attempts to commit offences</heading><subclause affected.by.uncommenced="0" guid="_bb75c74e-df38-4aaa-9242-442901427cc7" id="sec.816-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person who attempts to commit an offence against this Act commits an offence.</txt></block><penalty guid="_263d1083-6ef6-4ecf-a146-be42ed71098e" id="sec.816-ssec.1-pen"><block><txt break.before="1">Maximum penalty for an attempt—half the maximum penalty for the completed offence.</txt></block></penalty></subclause><subclause affected.by.uncommenced="0" guid="_45e47b11-51f9-4e2e-adcc-cff15cf15569" id="sec.816-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The <legref check="valid" jurisd="QLD" target.doc.id="act-1899-009" target.version.series="19dc3aee-7313-4ba8-a7f6-7abf0c19b425" type="act"><name emphasis="no">Criminal Code</name></legref>, <legref check="valid" jurisd="QLD" refid="sch.1-sec.4" target.doc.id="act-1899-009" target.guid="_8f9a19e2-98b1-427c-bff2-07359a99ef94" target.version.series="19dc3aee-7313-4ba8-a7f6-7abf0c19b425" type="act">section 4</legref> applies to <intref check="valid" refid="sec.816-ssec.1" target.guid="_bb75c74e-df38-4aaa-9242-442901427cc7">subsection (1)</intref>.</txt></block></subclause></clause></part></chapter><chapter affected.by.uncommenced="0" guid="_27e89a9e-1acd-4e56-96fc-dd3712c2ec2a" id="ch.12"><no>Chapter 12</no><heading guid="_6fb5d743-a8a1-41d4-aed8-be19544260b2" id="ch.12-he">Reviews and appeals</heading><part affected.by.uncommenced="0" guid="_0ac0dc53-f012-4593-aafd-019af765b52a" id="ch.12-pt.1"><no>Part 1</no><heading guid="_c402039e-0baf-4501-ae07-efe80727db07" id="ch.12-pt.1-he">Review of decisions</heading><clause affected.by.uncommenced="0" guid="_3bb240da-66d2-46c4-a13a-500a798a8340" id="sec.817" provision.type="other" spent.amends="0"><no>817</no><heading guid="_9ac9b76d-0d59-49dc-a75f-bd0262a0219b" id="sec.817-he">Who may apply for internal review</heading><subclause affected.by.uncommenced="0" guid="_aa3ff2fa-d486-4675-a66d-45f8dd78750a" id="sec.817-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person who has been given, or is entitled to be given, an information notice about a decision under this Act mentioned in <intref check="valid" refid="sch.1" target.guid="_7e30dc7a-6468-45ca-86c4-41e9b141965e">schedule 1</intref>, table 1 (an <defterm guid="_99a7c740-5a87-4a3e-aa3c-ba7672e1469b" id="sec.817-def.originaldecision" type="definition">original decision</defterm>) may apply for an internal review of the decision (an <defterm guid="_e550dcff-44ca-44f9-b53e-3655efcd65ce" id="sec.817-def.internalreviewapplication" type="definition">internal review application</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f1f31bd9-2ec9-4a11-9640-ff40bd02305f" id="sec.817-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An internal review application may be made only to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_859f36d1-6dc1-482c-a201-205175c2a863" id="sec.817-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the original decision to which the application relates was made by the chief executive—the Minister; or</txt></block></li><li guid="_5f2cb69b-6b29-49db-99e0-63a5b5c11832" id="sec.817-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the original decision to which the application relates was made by an inspector—the chief inspector; or</txt></block></li><li change="ins" guid="_13123778-4061-456f-863d-2ce68a47427b" id="sec.817-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the original decision to which the application relates was made by the CEO—the CEO; or</txt></block></li><li change="renumber" guid="_be34a796-feac-4f7c-9cd3-d478d4e0b544" id="sec.817-ssec.2-para1.d" provision.type="other"><no>(<del xml:space="preserve">c</del><ins xml:space="preserve">d</ins>)</no><block><txt break.before="0">otherwise—the chief executive.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c83e0421-c27a-4e2a-803e-a6e01cf5149b" id="sec.817-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The person to whom the internal review application may be made is the <defterm guid="_84dda854-d1a4-4b64-b500-7d825050b41c" id="sec.817-def.reviewer" type="definition">reviewer</defterm>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1499c863-5477-4046-8389-4c58b2355cc7" id="sec.818" provision.type="other" spent.amends="0"><no>818</no><heading guid="_0950517a-5b29-479e-bc0c-deea4d4ea13d" id="sec.818-he">Requirements for making application</heading><block><txt break.before="1">An internal review application—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c1b46689-2cdd-4a78-a457-d1e1ff268734" id="sec.818-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">can only be made within 20 business days after—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_da3904fb-5dc6-4662-bc44-756815f9bb42" id="sec.818-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">if the person has been given an information notice about the original decision to which the application relates—the day the person is given the notice; or</txt></block></li><li guid="_2c5d414f-e382-4184-974e-67a9ed5df2bb" id="sec.818-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if <intref check="valid" refid="sec.818-para1.a-para2.i" target.guid="_da3904fb-5dc6-4662-bc44-756815f9bb42">subparagraph (i)</intref> does not apply—the day the person otherwise becomes aware of the original decision; and</txt></block></li></list></block></li><li guid="_c3d6a9ee-038c-4634-93f8-c4e6dcae70f2" id="sec.818-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">must be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_11252e8d-5bdb-4a8d-bd87-196b91c22c8a" id="sec.818-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">in the approved form; and</txt></block></li><li guid="_d2b9dfed-7358-4ec8-91d3-b0ecdb862bc9" id="sec.818-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">accompanied by a statement of the grounds on which the applicant seeks the review of the decision; and</txt></block></li><li guid="_04cd23f7-2f83-44aa-982e-8db8aed9394e" id="sec.818-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">supported by enough information to enable the decision to be reviewed.</txt></block></li></list></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_0fa8b1a8-4ebf-4c1d-b58b-230a80ff084c" id="sec.819" provision.type="other" spent.amends="0"><no>819</no><heading guid="_99705550-ea50-48b4-ad1e-9ba38f8d3da0" id="sec.819-he">Stay of operation of original decision</heading><subclause affected.by.uncommenced="0" guid="_f4c7fad9-9060-4d5e-9730-d7b3a68d4b7c" id="sec.819-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The reviewer may grant a stay of the original decision to secure the effectiveness of the internal review.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a1513ba2-25ee-49e9-bb4a-d159ea77f4d0" id="sec.819-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A stay—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_91503e3e-3481-4d9f-bd51-97063ab95cde" id="sec.819-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">may be given on the conditions the reviewer considers appropriate; and</txt></block></li><li guid="_7147fbe6-b088-4e28-ab85-425176d2a616" id="sec.819-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">operates for the period fixed by the reviewer; and</txt></block></li><li guid="_27cb7568-c64a-4ddc-822b-099500949632" id="sec.819-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">may be amended or cancelled by the reviewer.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5a935cbe-a78d-4506-a66d-4ee23448af20" id="sec.819-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The period of a stay under this section must not extend past the time when the reviewer decides the internal review.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1d5a2ab3-4e70-40e7-9944-25effa539071" id="sec.819-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The internal review affects the decision, or carrying out of the decision, only if it is stayed.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e33b5880-d8af-4171-850f-cfe1d42e530d" id="sec.820" provision.type="other" spent.amends="0"><no>820</no><heading guid="_dc6bbb60-9bc8-4bb2-97b3-c3b443edd795" id="sec.820-he">Internal review decision</heading><subclause affected.by.uncommenced="0" guid="_da465c47-295a-4a6a-884c-562ae6250ccc" id="sec.820-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The reviewer must, within 20 business days after the internal review application is made (the <defterm guid="_f1174ae4-b0a7-4a31-919e-b95f1a6a9116" id="sec.820-def.requiredperiod" type="definition">required period</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ae15182e-ffab-422b-adde-07c101a25243" id="sec.820-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">review the original decision; and</txt></block></li><li guid="_c4753d23-49e4-4c47-9dc3-b87377cffaa0" id="sec.820-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">make a decision (the <defterm guid="_ae30130a-436a-4707-9272-682550d201a6" id="sec.820-ssec.1-def.internalreviewdecision" type="definition">internal review decision</defterm>) to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_88bdff98-0b13-4ab3-8d9d-b46e2636f595" id="sec.820-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">confirm the original decision; or</txt></block></li><li guid="_9d8eeb91-b91a-4ce5-a256-1ff63c68c853" id="sec.820-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">amend the original decision; or</txt></block></li><li guid="_b091a0cd-5db8-4a8e-a03e-59801f858d51" id="sec.820-ssec.1-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">substitute another decision for the original decision.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3316e93d-d82c-4717-aa85-2192115aaad1" id="sec.820-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the reviewer does not make the internal review decision within the required period, the reviewer is taken to have made that decision and to have decided to confirm the original decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5a2f4e69-a4c5-4ed2-856d-45d23f3f811e" id="sec.820-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the internal review decision confirms the original decision, for the purpose of an external review, the original decision is taken to be the internal review decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b20fafd6-768a-4b31-acfa-7b9ad2e3f407" id="sec.820-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the internal review decision amends the original decision, for the purpose of an external review, the original decision as amended is taken to be the internal review decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a22c8fd4-aac4-4215-924f-cc7d2926d514" id="sec.821" provision.type="other" spent.amends="0"><no>821</no><heading guid="_28a7170b-644a-47ea-af94-381c0af7a9bd" id="sec.821-he">Internal review procedure</heading><subclause affected.by.uncommenced="0" guid="_0cc54cf0-b74b-4791-bddc-87a48e4f25be" id="sec.821-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Despite any other provision of this Act or the <legref check="valid" jurisd="QLD" target.doc.id="act-1954-003" target.version.series="3cfb010e-ce09-4afd-baf6-bd10d22741a7" type="act"><name emphasis="yes">Acts Interpretation Act 1954</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.27A" target.doc.id="act-1954-003" target.guid="_c4a723d2-113f-49df-b9e5-162a6feab2a1" target.version.series="3cfb010e-ce09-4afd-baf6-bd10d22741a7" type="act">section 27A</legref>, the reviewer’s powers to review the original can not be delegated to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ba782a1c-0112-44a0-88a4-3100eefab6d1" id="sec.821-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a person who made the original decision under a delegation; or</txt></block></li><li guid="_ffc34e21-6f99-41e1-949d-5ef25aae5dd4" id="sec.821-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if this Act required the decision to be made by a person with particular qualifications or competencies—a person without at least the same or equivalent qualifications or competencies.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2a653d81-0582-4472-b129-68113e7b5f16" id="sec.821-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The reviewer may, in making the internal review decision, seek and take into account advice or information from anyone, including, for example, a review panel established by the reviewer.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_eaa1947f-851d-4fe8-97d7-31d684d74e1c" id="sec.822" provision.type="other" spent.amends="0"><no>822</no><heading guid="_336ba614-78dc-4a24-a6c8-4373fdb9c715" id="sec.822-he">Notice of internal review decision</heading><subclause affected.by.uncommenced="0" guid="_79df57b9-cddd-4c3d-a624-5defff95b67d" id="sec.822-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The reviewer must, within 5 business days after making an internal review decision, give the applicant notice (a <defterm guid="_b19b5b76-3fae-4e2c-8b7f-41a6433707d7" id="sec.822-def.reviewnotice" type="definition">review notice</defterm>) of the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c4addb0a-bec0-4c4a-a207-362995906e31" id="sec.822-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the internal review decision is not the decision sought by the applicant, the review notice must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7c6b708e-2c94-4464-bdbd-337b90771995" id="sec.822-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for an internal review decision about seizure or forfeiture of a thing—include, or be accompanied by, an information notice for the decision; or</txt></block></li><li guid="_221d6873-7d34-4389-9a97-8bc41c1e1f19" id="sec.822-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for another internal review decision—include, or be accompanied by, a QCAT information notice for the decision.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_041d02a5-234e-496a-bafb-a00abdd75555" id="sec.822-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the reviewer does not give the review notice within the 5 business days, the reviewer is taken to have made an internal review decision confirming the original decision.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_888eb36a-4b1b-41ca-a1f2-4f06a0d53fa6" id="ch.12-pt.2"><no>Part 2</no><heading guid="_16da93c1-32d5-40d7-a535-a230032b6966" id="ch.12-pt.2-he">Appeals and external review</heading><clause affected.by.uncommenced="0" guid="_fd2e0354-d8f4-41c9-bf8c-6aef462df5e4" id="sec.823" provision.type="other" spent.amends="0"><no>823</no><heading guid="_f401ca86-23b9-4305-bf00-63a175127f26" id="sec.823-he">Who may appeal or apply for external review</heading><subclause affected.by.uncommenced="0" guid="_d20365f8-c63e-41d1-8df1-0e2a5f9edd4e" id="sec.823-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person who is given, or is entitled to be given, a QCAT information notice for an internal review decision may apply, as provided under the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-023" target.version.series="c51aec25-167d-4389-82a2-012d28089e17" type="act"><name emphasis="no">QCAT Act</name></legref>, to QCAT for an external review of the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b04923bd-285b-488d-a192-918f7c88b1f4" id="sec.823-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A person who is given, or is entitled to be given, an information notice about seizure or forfeiture of a thing, may appeal against the internal review decision to the District Court (the <defterm guid="_fd94fef9-1240-4887-ac3e-a943113e213e" id="sec.823-def.appealbody" type="definition">appeal body</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_23548150-a4ee-4a1a-ba81-743ef5a501dc" id="sec.823-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A person whose interests are affected by a decision identified in <intref check="valid" refid="sch.1" target.guid="_7e30dc7a-6468-45ca-86c4-41e9b141965e">schedule 1</intref>, table 2, may appeal against the decision to the court (also the <defterm guid="_b6902fdd-3cbf-4ac8-8e55-a71b05d18c09" id="sec.823-def.appealbody-oc.2" type="definition">appeal body</defterm>) that the schedule states for the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_591e661e-e89f-456d-a9a0-f36f767b9e47" id="sec.823-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A person whose interests are affected by a decision identified in <intref check="valid" refid="sch.1" target.guid="_7e30dc7a-6468-45ca-86c4-41e9b141965e">schedule 1</intref>, table 3, may appeal against the decision to the court (also <defterm guid="_145d57ea-b722-4a57-bf07-95e2c101ed87" id="sec.823-def.theappealbody" type="definition">the appeal body</defterm>) that the schedule states for the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_56f2ff69-f3dc-44c7-8756-209408320b25" id="sec.823-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">For <intref check="valid" refid="sec.823-ssec.3" target.guid="_23548150-a4ee-4a1a-ba81-743ef5a501dc">subsections (3)</intref> and <intref check="valid" refid="sec.823-ssec.4" target.guid="_591e661e-e89f-456d-a9a0-f36f767b9e47">(4)</intref>, a person who has been given, or is entitled to be given, an information notice about a decision is taken to be a person whose interests are affected by the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d1accf1c-e35c-4e05-bab9-005a7082a8f7" id="sec.824" provision.type="other" spent.amends="0"><no>824</no><heading guid="_fdfc90c2-a041-4f6c-9df4-5c3532b93299" id="sec.824-he">Period to appeal</heading><subclause affected.by.uncommenced="0" guid="_cac25896-b4fe-437e-86f0-7d769f67bf10" id="sec.824-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An appeal under <intref check="valid" refid="sec.823" target.guid="_fd2e0354-d8f4-41c9-bf8c-6aef462df5e4">section 823</intref> against a decision must be started within 20 business days after—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_07107ad4-1f1d-4d3e-9cae-235a7b13a6e1" id="sec.824-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the person has been given an information notice for the decision—the day the person is given the notice; or</txt></block></li><li guid="_4d389162-16eb-4c69-a95a-1caaad67a88e" id="sec.824-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if <intref check="valid" refid="sec.824-ssec.1-para1.a" target.guid="_07107ad4-1f1d-4d3e-9cae-235a7b13a6e1">paragraph (a)</intref> does not apply—the day the person otherwise becomes aware of the decision.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_79032ecd-1a85-4f6d-b9b7-76d94e3b350b" id="sec.824-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the appeal body may, at any time within the 20 business days, extend the period for making an appeal.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_5b0d1ed6-3bf5-4e38-a89a-0f58905cf24e" id="sec.825" provision.type="other" spent.amends="0"><no>825</no><heading guid="_de7e2891-683d-471b-b921-438b4b346d8b" id="sec.825-he">Starting appeal</heading><subclause affected.by.uncommenced="0" guid="_bbef5304-4913-4371-a2b6-1f5b902b6a62" id="sec.825-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The appeal is started by filing a written notice of appeal with the appeal body.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a1466cfb-4136-42be-8abd-eca863c0b08d" id="sec.825-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A copy of the notice must be lodged.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c8fc6372-b5cc-4f6c-8843-fce45226f316" id="sec.825-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">An appeal to the District Court or industrial court may be made to the District Court or industrial court nearest the place where the applicant resides or carries on business.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bda81c63-c1f9-43f5-8b84-b96ee8788ce7" id="sec.825-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0"><intref check="valid" refid="sec.825-ssec.3" target.guid="_c8fc6372-b5cc-4f6c-8843-fce45226f316">Subsection (3)</intref> does not limit the court at which the appeal may be started under the <legref check="valid" jurisd="QLD" target.doc.id="sl-1999-0111" target.version.series="a4c6031c-5851-4957-a8e9-46b6b54892a3" type="subordleg"><name emphasis="yes">Uniform Civil Procedure Rules 1999</name></legref> or the <legref check="valid" jurisd="QLD" target.doc.id="act-2016-063" target.version.series="f12a0429-f8d5-43ea-8dd7-a48341b6571f" type="act"><name emphasis="yes">Industrial Relations Act 2016</name></legref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c9fe0910-2869-4da9-892d-34ed2a70db6b" id="sec.826" provision.type="other" spent.amends="0"><no>826</no><heading guid="_85997250-eb11-4d5e-b919-897465cc5fd2" id="sec.826-he">Stay of operation of decision</heading><subclause affected.by.uncommenced="0" guid="_f9131d8a-3970-497d-9fc1-0b4b7dd73d9b" id="sec.826-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The appeal body may grant a stay of the decision to secure the effectiveness of the appeal.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_769c0c8d-5d73-4570-bdfe-1779633dfa11" id="sec.826-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A stay—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7da0adc4-e37e-49a3-a6a1-e66d6c50a06c" id="sec.826-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">may be given on the conditions the appeal body considers appropriate; and</txt></block></li><li guid="_70e0b535-614e-4568-bbca-12463676ad24" id="sec.826-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">operates for the period fixed by the appeal body; and</txt></block></li><li guid="_3f1d876f-491b-4790-acac-80b788ed15f7" id="sec.826-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">may be amended or cancelled by the appeal body.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_321c9278-d0b3-4eeb-a4ac-5cbf0d02e489" id="sec.826-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The period of a stay under this section must not extend past the time when the appeal body decides the appeal.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ab80ceec-9462-4638-90ce-cce674e435c7" id="sec.826-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The appeal affects the decision, or carrying out of the decision, only if it is stayed.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7bb61242-ca60-4497-b1ff-8d29e73d47c2" id="sec.827" provision.type="other" spent.amends="0"><no>827</no><heading guid="_cd5e08f8-3d4d-4c39-87c6-33f68eeacd96" id="sec.827-he">Hearing procedures</heading><subclause affected.by.uncommenced="0" guid="_5d2575b8-196c-47ac-9844-497f7b9f7818" id="sec.827-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">In deciding an appeal, the appeal body—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_733cfe57-90cc-4d7c-8365-e90dd3f39c81" id="sec.827-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">has the same powers as the original decider; and</txt></block></li><li guid="_d7931f61-7fe1-4f4e-83dc-861982789970" id="sec.827-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is not bound by the rules of evidence; and</txt></block></li><li guid="_4c66469c-4179-4d49-a88f-e924dd84d0e5" id="sec.827-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">must comply with natural justice; and</txt></block></li><li guid="_e01f234f-3b39-4726-bbd2-71cb5302be5a" id="sec.827-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">may hear the appeal in court or in chambers.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2f15d67c-93ff-4382-96a5-0c6017605c31" id="sec.827-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An appeal is by way of rehearing, unaffected by the decision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b28d963c-004a-4bab-982c-0f8515a1e176" id="sec.827-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.827-ssec.1" target.guid="_5d2575b8-196c-47ac-9844-497f7b9f7818">subsections (1)</intref> and <intref check="valid" refid="sec.827-ssec.2" target.guid="_2f15d67c-93ff-4382-96a5-0c6017605c31">(2)</intref>, the procedure for the appeal is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e1fc6545-dab7-4c71-a15a-aad12d05a80f" id="sec.827-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in accordance with the rules for the appeal body; or</txt></block></li><li guid="_68ac1a9f-1a9f-4913-aa6b-0a7040841b51" id="sec.827-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">in the absence of relevant rules, as directed by the appeal body.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e8e38daa-2c69-4554-9504-df5bfb1cb553" id="sec.827-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A power under an Act to make rules for the appeal body includes power to make rules for appeals under this part.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7224f4c0-ed72-49ab-923e-1cead8ad8a2f" id="sec.828" provision.type="other" spent.amends="0"><no>828</no><heading guid="_b7e035f7-4c65-4ab4-a2c8-f6124a34e406" id="sec.828-he">Appeal body’s powers on appeal</heading><subclause affected.by.uncommenced="0" guid="_5ffb0c25-741a-46d2-ad2c-01eab89d1b22" id="sec.828-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Subject to <intref check="valid" refid="sec.829" target.guid="_f4d36ba2-bbc3-4115-9b1c-b7ceab1fc765">section 829</intref>, in deciding an appeal, the appeal body may—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9944dced-cfed-4adc-b09c-798c2c7a271d" id="sec.828-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">confirm the decision; or</txt></block></li><li guid="_8ce97d23-7613-40d3-afce-42b399fed002" id="sec.828-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">set aside the decision and substitute another decision; or</txt></block></li><li guid="_1581f68c-5011-44f0-8e76-42eb6953ef36" id="sec.828-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">set aside the decision and return the issue to the original decider with the directions the appeal body considers appropriate.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_56d3b132-ea12-4f35-a335-6c368cdc42b6" id="sec.828-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the appeal body substitutes another decision, the substituted decision is, for this Act, other than this chapter, taken to be the decision of the original decider.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f4d36ba2-bbc3-4115-9b1c-b7ceab1fc765" id="sec.829" provision.type="other" spent.amends="0"><no>829</no><heading guid="_76d06a45-7cff-494a-b1f5-d5c6cc9d5708" id="sec.829-he">Restriction on Land Court’s powers for decision not to grant petroleum lease</heading><subclause affected.by.uncommenced="0" guid="_0806c9db-f70c-4a25-bc00-374afef51f61" id="sec.829-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the Land Court is deciding an appeal against a decision under <intref check="valid" refid="sec.120" target.guid="_ca27be89-b993-4627-be10-da97814de1d8">section 120</intref> not to grant a petroleum lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b3b50a49-7e58-4862-a728-4e0fe00a492e" id="sec.829-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Land Court can not exercise a power mentioned in <intref check="valid" refid="sec.828" target.guid="_7224f4c0-ed72-49ab-923e-1cead8ad8a2f">section 828</intref><intref check="valid" refid="sec.828-ssec.1" target.guid="_5ffb0c25-741a-46d2-ad2c-01eab89d1b22">(1)</intref><intref check="valid" refid="sec.828-ssec.1-para1.b" target.guid="_8ce97d23-7613-40d3-afce-42b399fed002">(b)</intref> or <intref check="valid" refid="sec.828-ssec.1-para1.c" target.guid="_1581f68c-5011-44f0-8e76-42eb6953ef36">(c)</intref> in relation to the decision on the ground that the preference decision for the application for the lease was to give any coal or oil shale development preference, in whole or part.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_59ed37dd-8f81-4384-b047-05bd7216860a" id="sec.830" provision.type="other" spent.amends="0"><no>830</no><heading guid="_8d0c37ff-adcf-40fc-aa8a-f1f73c4df3d7" id="sec.830-he">Appeals from appeal body’s decision</heading><subclause affected.by.uncommenced="0" guid="_d8f5d815-e438-466e-ad22-d8d73f65eb16" id="sec.830-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An appeal to the Court of Appeal from a decision of the District Court under this part may be made only on a question of law.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3aa334f4-ffdc-4adc-a7e9-2c79a33a738b" id="sec.830-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An appeal to the District Court from a decision of the industrial court under this part may be made only on a question of law.</txt></block></subclause></clause></part></chapter><chapter affected.by.uncommenced="0" guid="_04b53e66-1a79-4240-8abd-2c234b5c2a2d" id="ch.13"><no>Chapter 13</no><heading guid="_bbae0e42-8bf3-4c46-ba50-f8ee44154230" id="ch.13-he">Evidence and legal proceedings</heading><part affected.by.uncommenced="0" guid="_8176b8ae-8205-478e-9206-93b266118fb5" id="ch.13-pt.1"><no>Part 1</no><heading guid="_691d77d8-7713-48ca-950e-e933ddf4e14b" id="ch.13-pt.1-he">Evidentiary provisions</heading><clause affected.by.uncommenced="0" guid="_c026f1b9-4c8d-4457-abf7-d91735fd975f" id="sec.831" provision.type="other" spent.amends="0"><no>831</no><heading guid="_d0c17aa3-ad3f-46b2-a945-f39448a63830" id="sec.831-he">Application of <intref check="valid" refid="ch.13-pt.1" target.guid="_8176b8ae-8205-478e-9206-93b266118fb5">pt 1</intref></heading><block><txt break.before="1">This part applies to a proceeding under or in relation to this Act.</txt></block></clause><clause affected.by.uncommenced="0" guid="_e6930935-aba8-4cf0-877b-9c2482aea502" id="sec.832" provision.type="other" spent.amends="0"><no>832</no><heading guid="_5618834e-4d74-4388-88b0-d12c7b0204ad" id="sec.832-he">Appointments and authority</heading><block><txt break.before="1">The following must be presumed unless a party to the proceeding, by reasonable notice, requires proof of it—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_85c033dc-9b0d-4250-8384-9d644a768dab" id="sec.832-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the appointment of an inspector or authorised officer;</txt></block></li><li guid="_c5674318-92ea-4dbf-a8cc-13821623b50e" id="sec.832-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the power of an official to do anything under this Act.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_54194a6a-1716-458f-b71c-e516c1702190" id="sec.833" provision.type="other" spent.amends="0"><no>833</no><heading guid="_40ab12da-8aa6-4bb3-89e5-ab51630c9091" id="sec.833-he">Signatures</heading><block><txt break.before="1">A signature purporting to be the signature of an official is evidence of the signature it purports to be.</txt></block></clause><clause affected.by.uncommenced="0" guid="_103017dc-4d25-4674-b3d8-d4c2e6e1060b" id="sec.834" provision.type="other" spent.amends="0"><no>834</no><heading guid="_767d51a6-03de-4f85-8acf-3e4c7373d47c" id="sec.834-he">Other evidentiary aids</heading><subclause affected.by.uncommenced="0" guid="_c62ebb36-6e54-4b86-901c-126fbe75c470" id="sec.834-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A certificate stating any of the following matters is evidence of the matter—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_695e7275-8b07-4f19-ac6b-ec29f0609d2b" id="sec.834-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a stated document, of any of the following types, is a document given, held, issued, kept or made under this Act—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_732460fe-a530-4e33-864a-7859050c5d0e" id="sec.834-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">an appointment, approval or decision;</txt></block></li><li guid="_6d6b5408-d3b9-4b72-829d-bbcaa2922040" id="sec.834-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a direction, notice or requirement;</txt></block></li><li guid="_3ea00d08-ac6d-475a-b333-26c94df2f132" id="sec.834-ssec.1-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">an authority under this Act;</txt></block></li><li guid="_ff33ab51-3fbd-4e51-ae4a-3f926476d9cd" id="sec.834-ssec.1-para1.a-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">the register the chief inspector keeps under section <del xml:space="preserve"><intref check="valid" refid="sec.730" target.guid="_88cecff7-49cd-4db6-96d9-e73df7d047cf">730</intref></del><ins xml:space="preserve">734AB</ins>;</txt></block></li><li guid="_d600e9d0-653a-4d68-88cf-6d3a19db6eff" id="sec.834-ssec.1-para1.a-para2.vi" provision.type="other"><no>(vi)</no><block><txt break.before="0">the safety management system for an operating plant;</txt></block></li><li guid="_613fd571-122a-4789-99cb-e77b4cd2467e" id="sec.834-ssec.1-para1.a-para2.vii" provision.type="other"><no>(vii)</no><block><txt break.before="0">a report;</txt></block></li><li guid="_fd3ced4f-e6ff-4eba-91ac-8d3cd101d174" id="sec.834-ssec.1-para1.a-para2.viii" provision.type="other"><no>(viii)</no><block><txt break.before="0">another record;</txt></block></li></list></block></li><li guid="_aad509be-5a90-4f56-899a-1a59edfa4ad6" id="sec.834-ssec.1-para1.aa" provision.type="other"><no>(aa)</no><block><txt break.before="0">that a stated document is a register kept or held under the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>;</txt></block></li><li guid="_f448270e-85ea-4ed6-812a-9015fb687ddf" id="sec.834-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a stated document is another document kept or held under this Act;</txt></block></li><li guid="_d89d7f6c-203a-45de-8e35-fc6bd8222131" id="sec.834-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a stated document is a copy of, or an extract from or part of, a thing mentioned in <intref check="valid" refid="sec.834-ssec.1-para1.a" target.guid="_695e7275-8b07-4f19-ac6b-ec29f0609d2b">paragraph (a)</intref> or <intref check="valid" refid="sec.834-ssec.1-para1.b" target.guid="_f448270e-85ea-4ed6-812a-9015fb687ddf">(b)</intref>;</txt></block></li><li guid="_24d41309-bd35-445e-9c34-f361d04d3a76" id="sec.834-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">on a stated day—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_28d93d16-3dbc-42ef-9df4-45ed91a8d144" id="sec.834-ssec.1-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a stated person was given a stated decision, direction or notice under this Act; or</txt></block></li><li guid="_d6947904-ac65-4233-b421-c3cb24a30a5a" id="sec.834-ssec.1-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a stated requirement under this Act was made of a stated person;</txt></block></li></list></block></li><li guid="_ed76f251-d4ca-46ba-ab3b-55db8d224f4f" id="sec.834-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">on a stated day, or during a stated period, an authority under this Act—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f5db4923-ffd2-436e-893c-78f4480976f4" id="sec.834-ssec.1-para1.e-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">was, or was not, in force; or</txt></block></li><li guid="_39d50537-1852-45cc-91f9-c7e4b39c82be" id="sec.834-ssec.1-para1.e-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">was, or was not, subject to a stated condition; or</txt></block></li><li guid="_39954f15-5c30-4938-b021-417a2fc92679" id="sec.834-ssec.1-para1.e-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">was, or was not, cancelled or suspended;</txt></block></li></list></block></li><li guid="_7cd4b713-93a8-4022-a1f0-300368b8eead" id="sec.834-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">a stated amount is payable under this Act by a stated person and has not been paid;</txt></block></li><li guid="_f9d41255-756b-41c7-9a2e-6fe1a436b4b7" id="sec.834-ssec.1-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">a stated address for the holder of an authority under this Act is the last address of the holder known to any official;</txt></block></li><li guid="_5dda0b0c-66b3-40db-bf7a-469f8873a6b9" id="sec.834-ssec.1-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">a stated location is within the area of a stated petroleum authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2ab39faf-ac81-4308-8651-be6439698180" id="sec.834-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_105954a8-ebfc-4509-9e74-171e11fb14a0" id="sec.834-ssec.2-def.certificate_"><txt break.before="1"><defterm guid="_dd8659f5-9dcb-4ffc-95e2-503eaefbf5ae" id="sec.834-ssec.2-def.certificate" type="definition">certificate</defterm> means a certificate purporting to be signed by the commissioner, the chief executive, the <ins xml:space="preserve">CEO, the WHS prosecutor, the </ins>chief inspector, an inspector or an authorised officer.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2dd2b841-c694-4412-ae1b-422ea277b13c" id="sec.835" provision.type="other" spent.amends="0"><no>835</no><heading guid="_c949e90c-8134-429e-b394-4c401141f909" id="sec.835-he">Proof of requirement for land</heading><block><txt break.before="1">A certificate by the Minister that stated land taken under <intref check="valid" refid="sec.456" target.guid="_a2ae2083-a7ba-4d2b-a95d-2db6e65409cb">section 456</intref><intref check="valid" refid="sec.456-ssec.2" target.guid="_490072b9-96fa-4367-8b3f-e5948a9d2711">(2)</intref> was required by the State or another stated person for a purpose mentioned in <intref check="valid" refid="sec.456" target.guid="_a2ae2083-a7ba-4d2b-a95d-2db6e65409cb">section 456</intref><intref check="valid" refid="sec.456-ssec.2" target.guid="_490072b9-96fa-4367-8b3f-e5948a9d2711">(2)</intref> is evidence that the taking was for that purpose.</txt></block></clause><clause affected.by.uncommenced="0" guid="_db6473f2-4c40-4178-9052-0df59d1c4c09" id="sec.836" provision.type="other" spent.amends="0"><no>836</no><heading guid="_ea3e6f8c-ec62-41a4-80f0-5fed9bfc7c04" id="sec.836-he">Safety management systems</heading><subclause affected.by.uncommenced="0" guid="_96e54636-b1b8-4520-9da7-e63345c0b585" id="sec.836-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if it is relevant for a proceeding to establish what was the safety management system for an operating plant at a particular time.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1bea771e-2fab-4909-8ac1-2ed79a10251b" id="sec.836-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For the proceeding, the safety management system the copy of which was accessible at the plant under <intref check="valid" refid="sec.676" target.guid="_2bf16c58-6938-48f2-a1ae-57dac9be4f56">section 676</intref><intref check="valid" refid="sec.676-ssec.1" target.guid="_6ea40a7d-00cb-499d-9069-7e2529fa5685">(1)</intref><intref check="valid" refid="sec.676-ssec.1-para1.a" target.guid="_18fc95a6-ac45-414d-9490-38209f93d26d">(a)</intref> at that time is taken to be the safety management system for the plant at that time.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_0fc76f70-6026-4d1b-b5a6-f7dac828bb41" id="ch.13-pt.2"><no>Part 2</no><heading guid="_56be0ac0-75ec-4f03-a49f-52143d26ad94" id="ch.13-pt.2-he">Offence proceedings</heading><clause affected.by.uncommenced="0" guid="_3aba38c8-f95e-4f85-a91d-60c4512f1c5d" id="sec.837" provision.type="other" spent.amends="0"><no>837</no><heading guid="_61ffb89a-70d5-4b41-9734-c7b15aaf0f35" id="sec.837-he"><del xml:space="preserve">Offences under Act are summary</del><ins xml:space="preserve">Proceedings for offences</ins></heading><subclause affected.by.uncommenced="0" guid="_c7daccda-de8d-4b8f-a6a1-0e4afdbe123b" id="sec.837-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Proceedings for an offence against this Act<ins xml:space="preserve">, other than an offence against chapter 11, part 1AA,</ins> are to be heard and decided summarily.</txt></block></subclause><subclause affected.by.uncommenced="0" change="insReplace" guid="_9bd53389-543c-4380-8da2-87d3be67d3fd" id="sec.837-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A proceeding for an offence against a provision of chapter 7, 8, 9 or 10, or a provision of chapter 11, part 1AA, may only be taken by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_941f98ce-0b63-4401-a21a-bd9dc41857c5" id="sec.837-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the offence is a serious offence—the WHS prosecutor; or</txt></block></li><li guid="_e99afc92-457a-4736-9d84-bb49812b9b03" id="sec.837-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—the CEO or the WHS prosecutor.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" change="ins" guid="_0e586bef-6c51-493e-91cf-7bf42fce26a2" id="sec.837-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the CEO may authorise in writing another appropriately qualified person to take a proceeding for an offence mentioned in subsection (2)(b).</txt></block></subclause><subclause affected.by.uncommenced="0" change="ins" guid="_3c06a495-7de1-413f-a685-15becc9e6d6f" id="sec.837-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">An authorisation under subsection (3) may be general or limited to a particular proceeding or class of proceedings. </txt></block></subclause><subclause affected.by.uncommenced="0" change="delReplace" guid="_723689f8-87f8-4fbb-a244-0d69c51a1f9b-del" id="sec.837-ssec.2-del" provision.type="other"><no>(2)</no><block><txt break.before="0">Proceedings for an offence against a provision of <intref check="valid" refid="ch.7" target.guid="_9b02e79a-6409-49bb-b011-85b79f00e39d">chapter 7</intref>, <intref check="valid" refid="ch.8" target.guid="_6a18d1e2-5229-45b6-aa25-5092246a8601">8</intref>, <intref check="valid" refid="ch.9" target.guid="_e115e3d8-9707-4c5d-b3e6-be71f8d522ee">9</intref> or <intref check="valid" refid="ch.10" target.guid="_c24d1b74-938d-44f7-b0f2-d23cd9205275">10</intref> may only be taken by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_16745f71-569b-4046-84c2-08bb6d569ae7-del" id="sec.837-ssec.2-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">the commissioner; or</txt></block></li><li guid="_8c3fb722-a353-4f93-970f-a1f7bc37cf69-del" id="sec.837-ssec.2-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">the chief executive; or</txt></block></li><li guid="_1b6254c9-7899-47fe-822a-aca4707bbf28-del" id="sec.837-ssec.2-para1.c-del" provision.type="other"><no>(c)</no><block><txt break.before="0">another appropriately qualified person, with the written authorisation of the chief executive, either generally or in a particular case.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" change="renumber" guid="_5072ab44-260f-4d0b-b4e5-7f146a749a41" id="sec.837-ssec.5" provision.type="other"><no>(<del xml:space="preserve">3</del><ins xml:space="preserve">5</ins>)</no><block><txt break.before="0">An authorisation under subsection (<del xml:space="preserve"><intref check="valid" refid="sec.837-ssec.2" target.guid="_723689f8-87f8-4fbb-a244-0d69c51a1f9b">2)</intref><intref check="valid" refid="sec.837-ssec.2-para1.c" target.guid="_1b6254c9-7899-47fe-822a-aca4707bbf28">(c) is sufficient authority to continue proceedings in any case where the court amends the charge, warrant or summons.</intref></del><ins xml:space="preserve">3) is sufficient authority to continue proceedings in any case where the court amends the charge, warrant or summons.</ins></txt></block></subclause><subclause affected.by.uncommenced="0" change="renumber" guid="_a4b6b829-cdb9-4b92-b87c-08b6f2c09160" id="sec.837-ssec.6" provision.type="other"><no>(<del xml:space="preserve">4</del><ins xml:space="preserve">6</ins>)</no><block><txt break.before="0">A proceeding for an offence against this Act must start within the later of the following periods to end—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_082dc9d6-8d13-4467-855a-185f545d4dc3" id="sec.837-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">2 years after the offence first comes to the notice of the complainant;</txt></block></li><li guid="_3605f34e-b45b-4873-b265-17f0ae2abc7d" id="sec.837-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the offence involves a breach of an obligation causing death and the death is investigated by a coroner under the <legref check="valid" jurisd="QLD" target.doc.id="act-2003-013" target.version.series="3362462b-5eb7-4e25-9a34-6b5105d33efe" type="act"><name emphasis="yes">Coroners Act 2003</name></legref>—2 years after the coroner makes a finding in relation to the death.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" change="ins" guid="_0063f6b5-714f-451e-8065-300cdf3f506a" id="sec.837-ssec.6A" provision.type="other"><no>(6A)</no><block><txt break.before="0">Subsection (6) does not apply to a proceeding for an offence against chapter 11, part 1AA.</txt></block></subclause><subclause affected.by.uncommenced="0" change="ins" guid="_dfe716c4-94f3-432a-a94c-bb599a92ae17" id="sec.837-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">In deciding whether to bring a prosecution for an offence under this Act, the WHS prosecutor must have regard to any guidelines issued under the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="yes">Director of Public Prosecutions Act 1984</name></legref>, section 11.</txt></block></subclause><subclause affected.by.uncommenced="0" change="ins" guid="_7b70ddb1-7cc4-4cb9-9ae8-15a7981b2584" id="sec.837-ssec.7A" provision.type="other"><no>(7A)</no><block><txt break.before="0">Nothing in this section affects the ability of the director of public prosecutions to bring proceedings for an offence against this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" change="ins" guid="_825941d9-5dfc-4f6c-b6b9-7eb042d0d97d" id="sec.837-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_ad43b773-b3d3-4811-8df4-a91537a17fb8" id="sec.837-ssec.8-def.seriousoffence_"><txt break.before="1"><defterm guid="_ce404a2c-902b-4c5f-9996-7ad5b6f55c44" id="sec.837-ssec.8-def.seriousoffence" type="definition">serious offence</defterm> means— </txt><list number.type="manual" unnumbered.indent="0"><li guid="_914c13a9-3cd0-4703-a4db-b75168538566" id="sec.837-ssec.8-def.seriousoffence-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an offence against chapter 9 if the act or omission that constitutes the offence caused any of the following circumstances— </txt><list number.type="manual" unnumbered.indent="0"><li guid="_6e6cfb61-f4dc-422e-b6a9-9dedbf1c3359" id="sec.837-ssec.8-def.seriousoffence-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the death of, or grievous bodily harm to, more than 1 person;</txt></block></li><li guid="_c95e6043-cf54-48b2-be8e-8f7e9e975d69" id="sec.837-ssec.8-def.seriousoffence-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the death of, or grievous bodily harm to, only 1 person;</txt></block></li><li guid="_e122d398-a776-41e5-9032-5810ef6dcfc7" id="sec.837-ssec.8-def.seriousoffence-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the exposure of anyone to a substance likely to cause death or grievous bodily harm;</txt></block></li><li guid="_12d8ee5c-269f-43c0-ad2b-ef1c6795dc17" id="sec.837-ssec.8-def.seriousoffence-para1.a-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">bodily harm; or</txt></block></li></list></block></li><li guid="_9efa1992-d708-4038-95d4-60550ece06e4" id="sec.837-ssec.8-def.seriousoffence-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an offence against chapter 11, part 1AA; or</txt></block></li><li guid="_3ba2cb94-cef8-48ee-8c2d-b85b74927023" id="sec.837-ssec.8-def.seriousoffence-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">an offence prescribed by regulation for this paragraph.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_401088aa-4718-4c7b-96f8-76606413f1e0" id="sec.837A" provision.type="other" spent.amends="0"><no>837A </no><heading guid="_92e2d952-19a3-452f-baad-c0a1ab29546e" id="sec.837A-he">WHS prosecutor may ask CEO for information</heading><subclause affected.by.uncommenced="0" guid="_a898fa50-f153-4561-babd-9a60c7a5851f" id="sec.837A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The WHS prosecutor may ask the CEO for information relevant to the performance of a function of the WHS prosecutor under this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_511e75f1-00d4-455e-a062-9a80c57f9e15" id="sec.837A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The CEO must take reasonable steps to provide the information.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3dd97f09-5f61-4cb3-bbb7-1972790a9e68" id="sec.837A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><definition affected.by.uncommenced="0" guid="_bc9af0ee-4f1b-4226-94a7-0aa46b9a2a4c" id="sec.837A-ssec.3-def.information_"><txt break.before="1"><defterm guid="_e033afc1-573b-4730-95c1-00fa9e20eef8" id="sec.837A-ssec.3-def.information" type="definition">information</defterm> includes a document.</txt></definition></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_95f4a35d-095d-49af-9943-efe6b77566a3" id="sec.837B" provision.type="other" spent.amends="0"><no>837B </no><heading guid="_d0f955e9-b0ba-47b4-87af-d6c1a2e13f5d" id="sec.837B-he">CEO’s duty to disclose information to WHS prosecutor</heading><subclause affected.by.uncommenced="0" guid="_3707ea3b-42e6-4910-ad5c-c96503d9b630" id="sec.837B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies in relation to a proceeding for an offence against this Act brought by the WHS prosecutor.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d9c4f868-cda6-4f94-b998-93e0a3f11dbc" id="sec.837B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The CEO has a duty to disclose to the WHS prosecutor all information relevant to the proceeding, including knowledge of a matter relevant to the proceeding, in the possession or control of the CEO.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_68cbfa59-7831-43d1-9f1b-4b0980c99ef7" id="sec.837B-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The duty continues until the proceeding is finally decided or otherwise ends.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a7654653-f9b4-4ae9-a372-4ebf09222758" id="sec.837B-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><definition affected.by.uncommenced="0" guid="_19bf8c0c-1707-4227-86dc-317c666730f7" id="sec.837B-ssec.4-def.information_"><txt break.before="1"><defterm guid="_e0b18424-2171-45fb-863a-aa2188471fa0" id="sec.837B-ssec.4-def.information" type="definition">information</defterm> includes a document.</txt></definition></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_113786c9-8125-4437-9f8a-e982b1fab737" id="sec.837C" provision.type="other" spent.amends="0"><no>837C </no><heading guid="_d6abfbf5-b40c-4191-96dd-6547ddf45d25" id="sec.837C-he">Procedure if prosecution not brought</heading><subclause affected.by.uncommenced="0" guid="_68a30bd6-e812-4687-868b-c0e969f4d84d" id="sec.837C-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1026a083-b8ca-476a-995a-0b1612e984ba" id="sec.837C-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a person reasonably considers that an act or omission constitutes a serious offence under section 837(8); and</txt></block></li><li guid="_5e4a8339-192e-4ac0-aa49-184c358cfbb1" id="sec.837C-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">no prosecution has been brought in relation to the act or omission; and</txt></block></li><li guid="_a06e5f6a-c1c1-470d-be51-79c66f6ed1dc" id="sec.837C-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the following period has elapsed from when the act or omission happened—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_02109062-3f36-48e4-8ac2-4cc5e3e04cb7" id="sec.837C-ssec.1-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">if the act or omission constitutes an offence against chapter 11, part 1AA—at least 6 months;</txt></block></li><li guid="_aedc51fb-4ede-4817-89b2-5924468734ee" id="sec.837C-ssec.1-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">otherwise—at least 6 months but no more than 12 months.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d1bd7c7d-7599-4ad2-b88f-7d1425bac0fd" id="sec.837C-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The person may make a written request to the WHS prosecutor that a prosecution be brought in relation to the act or omission.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e42fbeaf-f3ec-4a19-9d61-67dd412f6a7a" id="sec.837C-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Within 3 months after the WHS prosecutor receives the request, the WHS prosecutor must give the person, and any other person whom the person believes committed the serious offence, a notice in writing stating— </txt><list number.type="manual" unnumbered.indent="0"><li guid="_8aabe8c1-87da-45f2-819d-e1294be14d10" id="sec.837C-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">whether the investigation of the act or omission is complete; and</txt></block></li><li guid="_4993cd58-2d07-4509-9b8c-70ac540a8e2a" id="sec.837C-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the investigation of the act or omission is complete, whether a prosecution has been or will be brought in relation to the act or omission; and</txt></block></li><li guid="_fffb0995-69c7-4ab2-847c-c1f8f787ae13" id="sec.837C-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the advice under paragraph (b) is that a prosecution has not been or will not be brought—the reasons for not bringing the prosecution. </txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_bd0e6f7a-512a-41ff-bbda-7e46bdeb84f2" id="sec.837C-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Also, if the WHS prosecutor gives a notice under subsection (3)(b) that a prosecution has not been or will not be brought, the WHS prosecutor must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b27f97a9-cac3-4a99-a26a-5bbab2c0e3ff" id="sec.837C-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">advise in the notice that the person may ask the WHS prosecutor to refer the matter to the director of public prosecutions for consideration; and</txt></block></li><li guid="_a2e1ff6d-ba5d-4643-83ff-2ebb71a61c2d" id="sec.837C-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the person asks the WHS prosecutor in writing to refer the matter to the director of public prosecutions—refer the matter to the director of public prosecutions for consideration within 1 month after the person makes the request.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_25c75132-28df-476f-b29b-130deba83840" id="sec.837C-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The director of public prosecutions must consider the matter and within 1 month after the matter is referred give the WHS prosecutor advice in writing stating whether the director considers a prosecution should be brought.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ad21f870-da37-4b0f-bb67-581ff661324a" id="sec.837C-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The WHS prosecutor must give a copy of the advice under subsection (5) to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bce98000-3baa-41d1-a8ce-6616558c5287" id="sec.837C-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the person who made the request under subsection (2); and</txt></block></li><li guid="_63a28d3b-45fa-4484-8faa-5a447ee9af13" id="sec.837C-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any other person whom the person mentioned in paragraph (a) believes committed the serious offence.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d4cda4d9-d709-4809-8f7a-022e91e93f2f" id="sec.837C-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">If the WHS prosecutor declines to follow advice given under subsection (5) to bring proceedings, the WHS prosecutor must give written reasons for the decision to each person mentioned in subsection (6). </txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_cc95eaea-995f-4b5f-a8c0-3c06e3349561" id="sec.838" provision.type="other" spent.amends="0"><no>838</no><heading guid="_4315bafa-a1d3-411f-907b-db8ffbe8ea58" id="sec.838-he">Statement of complainant’s knowledge</heading><block><txt break.before="1">In a complaint starting a proceeding for an offence against this Act, a statement that the matter of the complaint came to the complainant’s knowledge on a stated day is evidence the matter came to the complainant’s knowledge on that day.</txt></block></clause><clause affected.by.uncommenced="0" guid="_dab72be8-3351-4e82-88c7-1a334a93de7d" id="sec.839" provision.type="other" spent.amends="0"><no>839</no><heading guid="_6039ba35-2078-46b8-82a2-a0d77ac2bd0b" id="sec.839-he">Allegations of false or misleading matters</heading><subclause affected.by.uncommenced="0" guid="_69fae993-06d9-46e8-9985-90ea0ecaf03a" id="sec.839-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to a proceeding for an offence against this Act described as involving—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0c56513a-b569-4d57-86a6-b2a8a26f4d1c" id="sec.839-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">false or misleading information; or</txt></block></li><li guid="_e982c881-5b4b-419d-8aea-aef33025d8ac" id="sec.839-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a false or misleading document or statement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_60344fff-3c10-400e-bd92-0469fb734b64" id="sec.839-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">It is enough for the complaint starting the proceeding to state the document, information or statement was ‘false or misleading’ to the defendant’s knowledge, without specifying which.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_daa8170a-25c8-4627-a4e4-7f5200262eab" id="sec.839-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In the proceeding, evidence that the document, information or statement was given or made recklessly is evidence that it was given or made so as to be false or misleading.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_957602e7-f694-4efb-8eb5-cf640f19dc59" id="sec.840" provision.type="other" spent.amends="0"><no>840</no><heading guid="_8b6bb3ff-af79-4175-b92e-4edbe29e2c60" id="sec.840-he">Responsibility for acts or omissions of representative</heading><subclause affected.by.uncommenced="0" guid="_c08ee3d5-3eca-4f25-862a-6d28ddd16adc" id="sec.840-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to a proceeding for an offence against this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_13ec3e33-cd73-4247-b4ae-45909a104ee7" id="sec.840-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If it is relevant to prove a person’s state of mind about a particular act or omission, it is enough to show—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2fe2371a-6516-4f87-9487-8d9f8c1d64da" id="sec.840-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the act was done or omitted to be done by a representative of the person within the scope of the representative’s actual or apparent authority; and</txt></block></li><li guid="_bf1d8369-5f00-4f03-8e13-3dca686c3fe9" id="sec.840-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the representative had the state of mind.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_24fbfeaf-0960-4f79-8d65-de13d6f7dedd" id="sec.840-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">An act done or omitted to be done for a person by a representative of the person within the scope of the representative’s actual or apparent authority is taken to have been done or omitted to be done also by the person, unless the person proves the person could not, by the exercise of reasonable precautions and proper diligence, have prevented the act or omission.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3936d6f9-5da3-4650-a786-8966908f7d62" id="sec.840-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_ee2a6685-6665-43c7-9a8d-38fc232f2e08" id="sec.840-ssec.4-def.representative_"><txt break.before="1"><defterm guid="_3717e0af-b421-4db6-840b-0d88e8e666f7" id="sec.840-ssec.4-def.representative" type="definition">representative</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_be290756-adb5-4466-9337-ff780bc4dd63" id="sec.840-ssec.4-def.representative-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for an individual—an employee or agent of the individual; or</txt></block></li><li guid="_5ce4fba7-57fe-40e1-9648-032328766bfa" id="sec.840-ssec.4-def.representative-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for a corporation—an executive officer, employee or agent of the corporation.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_f915cf9f-b120-4681-b19a-f1df019edbce" id="sec.840-ssec.4-def.stateofmind_"><txt break.before="1"><defterm guid="_8755eba6-bab7-4fe5-ac8b-d16084d8c596" id="sec.840-ssec.4-def.stateofmind" type="definition">state of mind</defterm>, of a person, includes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fbbb98fc-e64c-4fb3-9150-363d0fae7699" id="sec.840-ssec.4-def.stateofmind-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the person’s knowledge, intention, opinion, belief or purpose; and</txt></block></li><li guid="_83485fc1-bc51-435b-84fe-31a15ed69295" id="sec.840-ssec.4-def.stateofmind-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the person’s reasons for the intention, opinion, belief or purpose.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f98b5193-c1fa-4d7c-bbc0-4fba03176075" id="sec.840A" provision.type="other" spent.amends="0"><no>840A </no><heading guid="_e990713a-f47a-435b-ae5b-3ffc8c67859a" id="sec.840A-he">Costs of investigation</heading><subclause affected.by.uncommenced="0" guid="_32ea53e6-be1f-40e2-95a5-90024cfffd5d" id="sec.840A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a court convicts a person of an offence against this Act, the court may order the person to pay the department’s reasonable costs of investigating the offence, including reasonable costs of preparing for the prosecution of the offence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_eaf69b3a-87f8-4ed8-86d3-fc308f22cc15" id="sec.840A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">This section does not limit the orders for costs the court may make.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7273e0e9-2e56-4b5f-b665-e8245ca76320" id="sec.841" provision.type="other" spent.amends="0"><no>841</no><heading guid="_e43dcafb-c844-4b9d-80a8-5575357e4ed9" id="sec.841-he">Orders about forfeiture that may be made on conviction</heading><subclause affected.by.uncommenced="0" guid="_a1a70df2-3e1e-40da-8b19-93043273d8dc" id="sec.841-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a court convicts a person for an offence against this Act, it may—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_264f8407-2719-4da2-a464-5e032db1dd10" id="sec.841-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">order the forfeiture to the State of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8be1e3fa-af5d-4837-96da-6c5ad004af5a" id="sec.841-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">anything used to commit the offence; or</txt></block></li><li guid="_54c71d85-2119-4147-9884-2f5a27a32955" id="sec.841-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">anything else the subject of the offence; and</txt></block></li></list></block></li><li guid="_d9d0fa0f-fe93-40ae-b21f-b2781fcf4a57" id="sec.841-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">make any order to enforce the forfeiture it considers appropriate; and</txt></block></li><li guid="_c32dad5a-cd3e-4d5c-bb77-42e373039e66" id="sec.841-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">order the person to pay the State the amount of costs it incurred for remedial work that was necessary or desirable because of the commission of the offence.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ee86d4b7-d184-49a0-bbe4-d79eb3e5c452" id="sec.841-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Forfeiture of a thing may be ordered—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_88bbf0ca-0887-44b0-a737-29d2fa288e8f" id="sec.841-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">whether or not it has been seized under this Act; and</txt></block></li><li guid="_78f63153-0da5-4d6e-bbf2-193d6bb6eb15" id="sec.841-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if it has been seized under this Act, whether or not it has been returned to its owner.</txt></block></li></list></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_cae19d6f-b786-41c7-aa54-978a9f3715b8" id="ch.13-pt.3"><no>Part 3</no><heading guid="_f6e5989d-c35a-43c5-b271-9ff2502df8fd" id="ch.13-pt.3-he">Injunctions</heading><clause affected.by.uncommenced="0" guid="_8d55e6fb-57a1-4daf-b602-ae70b9b7b550" id="sec.841A" provision.type="other" spent.amends="0"><no>841A</no><heading guid="_784d056f-1322-402e-ace3-d1781ddb9460" id="sec.841A-he">Applying for injunction</heading><subclause affected.by.uncommenced="0" guid="_c6c40adf-ad00-4909-8cf8-0b4ef7d9d884" id="sec.841A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The <del xml:space="preserve">commissioner</del><ins xml:space="preserve">CEO</ins> or chief inspector may apply to the District Court for an injunction under this part.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_309850b5-3dac-4799-820e-d314dbf5bfd2" id="sec.841A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An injunction under this part may be granted by the District Court against a person at any time.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7676e316-6b78-41f7-96e9-769c7981cd37" id="sec.841B" provision.type="other" spent.amends="0"><no>841B</no><heading guid="_cbd2711d-f1c9-479d-a8b9-dddb1813bdfd" id="sec.841B-he">Grounds for injunction</heading><block><txt break.before="1">The District Court may grant an injunction if the court is satisfied a person has engaged, or is proposing to engage, in conduct that constitutes or would constitute—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_edfee744-8b7c-4be2-9a11-2ff60c3710d7" id="sec.841B-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a contravention of a provision of <intref check="valid" refid="ch.9" target.guid="_e115e3d8-9707-4c5d-b3e6-be71f8d522ee">chapter 9</intref>; or</txt></block></li><li guid="_f32cd7ef-398c-46e4-bdcd-bcef3cc4d087" id="sec.841B-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">attempting to contravene a provision of <intref check="valid" refid="ch.9" target.guid="_e115e3d8-9707-4c5d-b3e6-be71f8d522ee">chapter 9</intref>; or</txt></block></li><li guid="_944d52ec-7cb9-458d-9ca1-4aa504c7ffd7" id="sec.841B-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">aiding, abetting, counselling or procuring a person to contravene a provision of <intref check="valid" refid="ch.9" target.guid="_e115e3d8-9707-4c5d-b3e6-be71f8d522ee">chapter 9</intref>; or</txt></block></li><li guid="_0b570c0c-eba1-4446-bfe2-a1b31414a185" id="sec.841B-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">inducing or attempting to induce, whether by threats, promises or otherwise, a person to contravene a provision of <intref check="valid" refid="ch.9" target.guid="_e115e3d8-9707-4c5d-b3e6-be71f8d522ee">chapter 9</intref>; or</txt></block></li><li guid="_b832710a-8913-41d6-895b-6638fa7b2087" id="sec.841B-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">being in any way, directly or indirectly, knowingly concerned in, or party to, the contravention of a provision of <intref check="valid" refid="ch.9" target.guid="_e115e3d8-9707-4c5d-b3e6-be71f8d522ee">chapter 9</intref> by a person; or</txt></block></li><li guid="_6ba31fd1-1717-4516-8f6c-82290ee2b87c" id="sec.841B-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">conspiring with others to contravene a provision of <intref check="valid" refid="ch.9" target.guid="_e115e3d8-9707-4c5d-b3e6-be71f8d522ee">chapter 9</intref>.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_bd388295-0e70-4f25-a337-d4c3101a28cf" id="sec.841C" provision.type="other" spent.amends="0"><no>841C</no><heading guid="_b6df2107-2234-4b07-a125-449cbf3b7625" id="sec.841C-he">Court’s powers for injunction</heading><subclause affected.by.uncommenced="0" guid="_545756d4-eb56-4049-b2ad-2abf89683593" id="sec.841C-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The power of the District Court to grant an injunction restraining a person from engaging in conduct may be exercised—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_51559d9f-540e-40d8-be58-996a7563db04" id="sec.841C-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">whether or not it appears to the court that the person intends to engage again, or to continue to engage, in conduct of that kind; and</txt></block></li><li guid="_6e5333e3-21ab-4fa5-ba7f-682834c1dc2d" id="sec.841C-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether or not the person has previously engaged in conduct of that kind.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5323ad39-b18d-4a10-b371-25b298415c83" id="sec.841C-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The power of the court to grant an injunction requiring a person to do an act or thing may be exercised—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4dfcd218-ff04-4846-a7c7-bbaea6dbd87d" id="sec.841C-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">whether or not it appears to the court that the person intends to fail again, or to continue to fail, to do the act or thing; and</txt></block></li><li guid="_62a9edb3-f1ce-4620-9b6c-aa252353c672" id="sec.841C-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether or not the person has previously failed to do the act or thing.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_12118f17-c845-401e-93a0-14150cd165e4" id="sec.841C-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">An interim injunction may be granted under this part until the application is finally decided.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_71d3fca6-9f86-4b66-84cc-c87daa8ebd5e" id="sec.841C-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The court may rescind or vary an injunction at any time.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_83017cfd-2424-41ee-8af0-62b2877c36a1" id="sec.841D" provision.type="other" spent.amends="0"><no>841D</no><heading guid="_051c8d4d-a176-4219-86e5-facdc3af2ad5" id="sec.841D-he">Terms of injunction</heading><subclause affected.by.uncommenced="0" guid="_de9deea9-e0b5-42bb-a38b-438d7d499a41" id="sec.841D-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The District Court may grant an injunction in the terms the court considers appropriate.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8d68293c-8a62-47cd-8ad8-2030b8b730d5" id="sec.841D-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting the court’s power under <intref check="valid" refid="sec.841D-ssec.1" target.guid="_de9deea9-e0b5-42bb-a38b-438d7d499a41">subsection (1)</intref>, an injunction may be granted restraining a person from carrying on particular activities—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_398454d1-4ac6-49bb-a736-4b33535fd073" id="sec.841D-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for a stated period; or</txt></block></li><li guid="_7751deee-cd61-45f5-b85c-9901d2a56ebd" id="sec.841D-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">except on stated terms and conditions.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1e89741f-65f8-4ccc-8c9c-eb0982dba23e" id="sec.841D-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, the court may grant an injunction requiring a person to take stated action, including action to disclose or publish information, to remedy any adverse consequences of the person’s contravention of this Act.</txt></block></subclause></clause></part></chapter><chapter affected.by.uncommenced="0" guid="_7ee6daab-b446-4e66-bc06-a512720a57d9" id="ch.14"><no>Chapter 14</no><heading guid="_9902e91f-b415-415c-980a-dae46e7da442" id="ch.14-he">Miscellaneous provisions</heading><part affected.by.uncommenced="0" guid="_108499d8-4a72-4118-bb31-a62f01acaa46" id="ch.14-pt.1"><no>Part 1</no><heading guid="_c5408b02-961a-45c9-828b-a793fabcd323" id="ch.14-pt.1-he">Applications</heading><note guid="_8d3d182b-3a23-4f48-aacb-4d7f97b49e23" id="ch.14-pt.1-note" type="example"><heading guid="_f10ef98c-d4ca-4164-a7ec-a765537da877" id="ch.14-pt.1-note-he">Notes—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_cc468035-6218-4d99-b4fd-8fcda85b0219" id="ch.14-pt.1-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">Under <intref check="valid" refid="sec.55A" target.guid="_3b8b96d6-8d85-4e4d-8a0c-ed960e2d886e">section 55A</intref>, this part also applies in relation to the lodgement by an authority to prospect holder of a proposed later work program.</txt></block></li><li guid="_0d7b3325-02dc-4bdb-a874-5396b4870be4" id="ch.14-pt.1-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">Under <intref check="valid" refid="sec.145A" target.guid="_f51ae72a-ad75-4ca2-ad7b-9294ba889705">section 145A</intref>, this part also applies in relation to the lodgement by a petroleum lease holder of a proposed later development plan.</txt></block></li></list></block></note><clause affected.by.uncommenced="0" guid="_1d448675-d823-4190-9718-39e940dadaba" id="sec.842" provision.type="other" spent.amends="0"><no>842</no><heading guid="_e33655bc-4551-4f1e-aa05-0d69c28fd324" id="sec.842-he">Requirements for making an application</heading><subclause affected.by.uncommenced="0" guid="_dd26acab-75d6-4190-90d7-d6d4863b80ce" id="sec.842-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to a purported application, other than to the Land Court, not made under the requirements under this Act for making the application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f81e2df9-7f79-4c9a-b982-bc3bc0e72cf3" id="sec.842-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The relevant person for the application must refuse to receive or process the purported application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_55d7892d-32c3-4377-8137-adef10e3ef0a" id="sec.842-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the relevant person may decide to allow the application to proceed and be decided as if it did comply with the requirements if the relevant person is satisfied the application substantially complies with the requirements.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d92bab24-7989-4c41-8744-e0a14394cc30" id="sec.842-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the relevant person decides to refuse to receive or process the purported application—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7fd8510a-9d41-4ce4-8975-2af5c6cb5e0a" id="sec.842-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the relevant person must give the applicant notice of the decision and the reasons for it; and</txt></block></li><li guid="_89ad6f47-8036-45ba-af83-f638a9154ed0" id="sec.842-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the relevant person must refund the application fee to the applicant.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1ec9be21-7ed3-44ff-bb6c-adb5bb45d799" id="sec.842-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_9d98bd46-3804-4653-864e-c0d58ecd8a20" id="sec.842-ssec.5-def.relevantperson_"><txt break.before="1"><defterm guid="_77490238-0452-40b3-bfe1-32191b0cad41" id="sec.842-ssec.5-def.relevantperson" type="definition">relevant person</defterm>, for an application, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_430cd325-09bc-41a1-9c8d-cd422c1be6d2" id="sec.842-ssec.5-def.relevantperson-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the chief inspector, if the application is made under—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fd88cea5-5cd9-4b4d-8baf-216faec409e7" id="sec.842-ssec.5-def.relevantperson-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0"><intref check="valid" refid="sec.622" target.guid="_f61e22bc-82ff-463d-b3ee-a75d9d0acbd2">section 622</intref> or <intref check="valid" refid="sec.728" target.guid="_e3961570-09cf-4364-9e76-16b518975aa0">728</intref>; or</txt></block></li><li guid="_2243005f-77f6-463f-8c3b-922702595964" id="sec.842-ssec.5-def.relevantperson-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0"><intref check="valid" refid="ch.9" target.guid="_e115e3d8-9707-4c5d-b3e6-be71f8d522ee">chapter 9</intref>, <intref check="valid" refid="ch.9-pt.1" target.guid="_f7270c11-7622-46a5-8996-bea8d3855f8c">part 1</intref>; or</txt></block></li></list></block></li><li guid="_f4002db7-c940-4e22-8761-0f5667bc0cc7" id="sec.842-ssec.5-def.relevantperson-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—the chief executive.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_84fbc68e-f3f4-4492-83b2-44bef5eb03af" id="sec.843" provision.type="other" spent.amends="0"><no>843</no><heading guid="_d81a990e-aace-48f5-8aa1-e764635c3cc9" id="sec.843-he">Request to applicant about application</heading><subclause affected.by.uncommenced="0" guid="_ca91c102-b51d-4413-833d-b5c6b0cfc043" id="sec.843-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">For an application under this Act, the relevant person for the application may, by notice, require the applicant to do all or any of the following within a stated reasonable period—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7e029203-a4f3-4bc0-8e61-a02d6cbdc115" id="sec.843-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">complete or correct the application if it appears to the relevant person to be incorrect, incomplete or defective;</txt></block></li><li guid="_c135f0f6-65fd-4083-8714-13cd0a68ed37" id="sec.843-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">give the relevant person or another stated officer of the department additional information about, or relevant to, the application;</txt><note guid="_50d83d14-967e-44f0-b6d7-7449d2ee9921" id="sec.843-ssec.1-para1.b-note" type="example"><heading guid="_e02a45ae-23ff-4736-a9e6-8a4e6e9da474" id="sec.843-ssec.1-para1.b-note-he">Examples—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_b36197ec-6eb8-49c1-b113-3429f5e7cd66" id="sec.843-ssec.1-para1.b-note-para2.1" provision.type="other"><no>1</no><block><txt break.before="0">The application is for a petroleum lease. The chief executive may require additional information about a document given with the application, for example, a document prepared by an appropriately qualified person, independently verifying reserve data given in the proposed development plan for the lease.</txt></block></li><li guid="_945c3259-0764-4f4b-9746-8e5157cf73cf" id="sec.843-ssec.1-para1.b-note-para2.2" provision.type="other"><no>2</no><block><txt break.before="0">The application is for a potential commercial area. The chief executive may require additional information about drilling and production test results.</txt></block></li></list></block></note></block></li><li guid="_e8fb6bab-748a-4ceb-9b88-1614e15a4abd" id="sec.843-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">give the relevant person or another stated officer of the department an independent report by an appropriately qualified person, or a statement or statutory declaration, verifying all or any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_65397105-e358-4aa1-b6ab-1c31467fecd5" id="sec.843-ssec.1-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">any information included in the application;</txt></block></li><li guid="_77766d90-7a77-4926-aa7e-6b43c7131655" id="sec.843-ssec.1-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">any additional information required under <intref check="valid" refid="sec.843-ssec.1-para1.b" target.guid="_c135f0f6-65fd-4083-8714-13cd0a68ed37">paragraph (b)</intref>;</txt></block></li><li guid="_2ddc3334-ead0-47f1-b0b1-683887dbcc55" id="sec.843-ssec.1-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">if the application is for a petroleum tenure—that the applicant meets the relevant capability criteria under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e378f31f-d63e-41d9-ae5d-f8ce0eecfa60" id="sec.843-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.843-ssec.1" target.guid="_ca91c102-b51d-4413-833d-b5c6b0cfc043">subsection (1)</intref><intref check="valid" refid="sec.843-ssec.1-para1.b" target.guid="_c135f0f6-65fd-4083-8714-13cd0a68ed37">(b)</intref>, if the application is for a petroleum authority, a required document may include a survey or resurvey of the area of the proposed authority carried out by a person who is a cadastral surveyor under the <legref check="valid" jurisd="QLD" target.doc.id="act-2003-070" target.version.series="58bf4472-9a2d-4809-9f04-c4ff625373da" type="act"><name emphasis="yes">Surveyors Act 2003</name></legref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a6da32c4-f290-4034-9f40-a9dacf13601a" id="sec.843-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For <intref check="valid" refid="sec.843-ssec.1" target.guid="_ca91c102-b51d-4413-833d-b5c6b0cfc043">subsection (1)</intref><intref check="valid" refid="sec.843-ssec.1-para1.c" target.guid="_e8fb6bab-748a-4ceb-9b88-1614e15a4abd">(c)</intref>, the notice may require the statement or statutory declaration—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3a8edfc2-0fdf-4724-911f-3a0fa93ff6b9" id="sec.843-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to be made by an appropriately qualified independent person or by the applicant; and</txt></block></li><li guid="_81cfa692-2d2e-4df0-9dee-ad34f16e5446" id="sec.843-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the applicant is a corporation—to be made for the applicant by an executive officer of the applicant.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6b5f0b5c-4a69-410c-a636-987ea56aea3b" id="sec.843-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The giving of a statement for <intref check="valid" refid="sec.843-ssec.1" target.guid="_ca91c102-b51d-4413-833d-b5c6b0cfc043">subsection (1)</intref><intref check="valid" refid="sec.843-ssec.1-para1.c" target.guid="_e8fb6bab-748a-4ceb-9b88-1614e15a4abd">(c)</intref> does not prevent the relevant person from also requiring a statutory declaration for the subsection.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3e617277-d6a4-447e-a5ff-7ba1e5f8977b" id="sec.843-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The applicant must bear any costs incurred in complying with the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_50bb78a9-0eee-41ad-9af5-11b4a36bfa8e" id="sec.843-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">The relevant person may extend the period for complying with the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bd61e6b9-201b-4fa6-9c63-57a8e95597a8" id="sec.843-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_bd95fc3d-09a3-41c7-b1ea-d9388e3d527f" id="sec.843-ssec.7-def.application_"><txt break.before="1"><defterm guid="_03b56f1c-0e3d-49ef-9aee-2482f246792a" id="sec.843-ssec.7-def.application" type="definition">application</defterm> does not include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5d92facf-de89-4422-8462-b58edff5ae67" id="sec.843-ssec.7-def.application-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an application to a court or tribunal; or</txt></block></li><li guid="_15a4642d-0559-43a7-a62f-5205f9fb44b4" id="sec.843-ssec.7-def.application-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an internal review application under <intref check="valid" refid="ch.12" target.guid="_27e89a9e-1acd-4e56-96fc-dd3712c2ec2a">chapter 12</intref>, <intref check="valid" refid="ch.12-pt.1" target.guid="_0ac0dc53-f012-4593-aafd-019af765b52a">part 1</intref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_c60910a6-0be7-41fa-889b-9f1018cf2bfc" id="sec.843-ssec.7-def.information_"><txt break.before="1"><defterm guid="_0e24d642-cb25-4786-a93b-bc32610a12a7" id="sec.843-ssec.7-def.information" type="definition">information</defterm> includes a document.</txt></definition><definition affected.by.uncommenced="0" guid="_9af41665-1146-4376-b565-1c6d6074723b" id="sec.843-ssec.7-def.relevantperson_"><txt break.before="1"><defterm guid="_b784bfbe-9064-4a0e-9eae-67d7afdd4e88" id="sec.843-ssec.7-def.relevantperson" type="definition">relevant person</defterm>, for an application under this Act, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4f09896f-246f-40b4-a307-743b9fb35d13" id="sec.843-ssec.7-def.relevantperson-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the chief inspector, if the application is made under—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0ddb57f8-f343-4f14-a209-4c382b88dcfb" id="sec.843-ssec.7-def.relevantperson-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">section <intref check="valid" refid="sec.622" target.guid="_f61e22bc-82ff-463d-b3ee-a75d9d0acbd2">622</intref> or <intref check="valid" refid="sec.728" target.guid="_e3961570-09cf-4364-9e76-16b518975aa0">728</intref>; or</txt></block></li><li guid="_109ba55d-88e4-49b5-a415-ce2cd03843af" id="sec.843-ssec.7-def.relevantperson-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0"><intref check="valid" refid="ch.9" target.guid="_e115e3d8-9707-4c5d-b3e6-be71f8d522ee">chapter 9</intref>, <intref check="valid" refid="ch.9-pt.1" target.guid="_f7270c11-7622-46a5-8996-bea8d3855f8c">part 1</intref>; or</txt></block></li></list></block></li><li guid="_2c0f0ca4-09b2-4f63-b5dd-3e4d6ff4c2b6" id="sec.843-ssec.7-def.relevantperson-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—the chief executive.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_cc9ec269-641a-4758-bea2-7d374790f8d6" id="sec.843A" provision.type="other" spent.amends="0"><no>843A</no><heading guid="_dfe26708-fb11-4bfb-b567-a625ba3a209e" id="sec.843A-he">Refusing application for failure to comply with request</heading><subclause affected.by.uncommenced="0" guid="_3ca47f61-f3c6-4ddf-863a-483c63d393ae" id="sec.843A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies for an application if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ef128c70-5a05-4e70-b545-c3e5f7654bcb" id="sec.843A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the chief executive or the chief inspector gives a notice under <intref check="valid" refid="sec.843" target.guid="_84fbc68e-f3f4-4492-83b2-44bef5eb03af">section 843</intref> for the application; and</txt></block></li><li guid="_3947dff2-cc22-4f29-8efa-126fbeddfd69" id="sec.843A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the period stated in the notice for complying with it has ended; and</txt></block></li><li guid="_29f15f2c-c643-4523-9f5a-6766e0cebe6b" id="sec.843A-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the request has not been complied with to the satisfaction of the person who gave the notice.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_50491a01-0d48-40ac-82e9-1ca4b1a63b76" id="sec.843A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application may be refused by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3c2a0e38-c9a8-4f5c-9bb7-b6523110d1af" id="sec.843A-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the notice was given by the chief executive—the Minister; or</txt></block></li><li guid="_4e0cbdd2-504b-45b5-bde9-9f746b6c947f" id="sec.843A-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the notice was given by the chief inspector—the chief inspector.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_97e79813-3797-4fba-95f4-9b4141693b05" id="sec.843A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">To remove any doubt, it is declared that <intref check="valid" refid="sec.843A-ssec.2" target.guid="_50491a01-0d48-40ac-82e9-1ca4b1a63b76">subsection (2)</intref> applies despite another provision of this Act that provides the application must be granted in particular circumstances or if particular requirements have been complied with.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d77160bc-f4eb-46c8-85f4-5975efc5eab2" id="sec.843B" provision.type="other" spent.amends="0"><no>843B</no><heading guid="_559fa50e-47a4-4f75-9812-20789d64227d" id="sec.843B-he">Notice to progress petroleum authority or renewal applications</heading><subclause affected.by.uncommenced="0" guid="_9321d73b-e3dd-4f36-aa1e-065b5da5c028" id="sec.843B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may by notice require an applicant for, or to renew, a petroleum authority to do, within a stated reasonable period, any thing required of the applicant under this Act or another Act to allow the application to be decided or the authority to be granted or renewed.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8f70e019-5cd8-444f-8c12-a204cfe0a157" id="sec.843B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the period for complying with the notice must be at least 20 business days after the notice is given.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b208a034-a262-497c-8560-50b19ffc881c" id="sec.843B-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister may extend the period for complying with the notice.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_05fe1c57-c01b-4bb2-b68e-0aecdda3d4f1" id="sec.843B-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The Minister may refuse the application if the applicant does not comply with the requirement.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a4115c5e-2f25-4f2d-9af4-4da038a40ad2" id="sec.843C" provision.type="other" spent.amends="0"><no>843C</no><heading guid="_c810fe3b-6994-43a0-9208-8bf25b977835" id="sec.843C-he">Particular criteria generally not exhaustive</heading><subclause affected.by.uncommenced="0" guid="_f0a9ecd4-dbe4-470c-934a-3efe31ccbd45" id="sec.843C-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if another provision of this Act permits or requires the decision-maker for an application under this Act to consider particular criteria in deciding the application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5f94167e-e31c-44b1-856d-dba728988105" id="sec.843C-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">To remove any doubt, it is declared that the decision-maker may, in making the decision, consider any other criteria the decision-maker considers relevant.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_11a395f0-5b63-4946-9c9d-d9f4a8c63f01" id="sec.843C-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, <intref check="valid" refid="sec.843C-ssec.2" target.guid="_5f94167e-e31c-44b1-856d-dba728988105">subsection (2)</intref> does not apply if the provision otherwise provides.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_783315e3-5926-45c6-8173-0c30a4dea832" id="sec.843C-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_e62241c9-505e-4261-af68-dc854167708e" id="sec.843C-ssec.4-def.criteria_"><txt break.before="1"><defterm guid="_e29b8117-92be-4177-bf6d-47b4432e246b" id="sec.843C-ssec.4-def.criteria" type="definition">criteria</defterm> includes issues and matters.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_deffd685-bfcb-4e33-8b37-ee6d97a33332" id="sec.843D" provision.type="other" spent.amends="0"><no>843D</no><heading guid="_5946dd3a-9ccf-4018-b61b-4c2081c6f4c9" id="sec.843D-he">Particular grounds for refusal generally not exhaustive</heading><subclause affected.by.uncommenced="0" guid="_15f61f43-9d40-4b0c-815a-8364474d9bce" id="sec.843D-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if another provision of this Act provides for particular grounds on which the decision-maker for an application under this Act may refuse the application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_30cd3462-8cc0-4698-a98c-6c8a8afab5aa" id="sec.843D-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">To remove any doubt, it is declared that, unless the other provision otherwise provides, the decision-maker may refuse the application on another reasonable and relevant ground.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d2707d8f-1b20-4539-b286-352dac3cbe8e" id="sec.843D-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_06c0b9df-f50e-4232-a9fe-77061fd44da2" id="sec.843D-ssec.3-def.refuse_"><txt break.before="1"><defterm guid="_ee6a037a-1643-4894-8e88-ebde27ccd9bb" id="sec.843D-ssec.3-def.refuse" type="definition">refuse</defterm>, an application, includes refuse the thing the subject of the application.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_bd8bc0d2-5554-4a17-a045-fc398d0d703b" id="sec.844" provision.type="other" spent.amends="0"><no>844</no><heading guid="_582fc724-77e9-4514-92d3-7d7c0d26a377" id="sec.844-he">Amending applications</heading><subclause affected.by.uncommenced="0" guid="_95fb1baf-000c-44ec-8c24-806504f334d9" id="sec.844-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a person has made an application under this Act, the person may amend the application or a document accompanying the application only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_79c565ac-6105-474f-b8ab-db8ea89d2d62" id="sec.844-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the application has not been decided; and</txt></block></li><li guid="_da1653d7-bc21-4d60-83e2-cc966f819e55" id="sec.844-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the relevant person has agreed to the making of the amendment; and</txt></block></li><li guid="_2bdbab2e-b82d-4b3f-8a82-cf08abbe08e2" id="sec.844-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the proposed amendment is to change the applicant—each applicant, and proposed applicant, has agreed to the change; and</txt></block></li><li guid="_7a92d82d-57c2-42e3-a43a-1702218f8b63" id="sec.844-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the person has paid any fee prescribed by regulation for the amendment.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b64bee28-9864-4455-984e-a65ab9059bc5" id="sec.844-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if the application is a tender for a petroleum tenure—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_46948758-78c1-402b-84a7-8ccd2c958371" id="sec.844-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a proposed work program or development plan included in the tender can not be amended after the applicant has become the preferred tenderer for the tender; and</txt></block></li><li guid="_6e475106-4981-45bc-b9a0-ce5aac7c67bb" id="sec.844-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the tender can not be otherwise amended after the closing time for the relevant call for tenders.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_71571609-f221-4650-be11-02959abf19b9" id="sec.844-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0def76b4-e314-4465-956f-33a7b160a133" id="sec.844-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0"><intref check="valid" refid="sec.844-ssec.2" target.guid="_b64bee28-9864-4455-984e-a65ab9059bc5">subsection (2)</intref><intref check="valid" refid="sec.844-ssec.2-para1.a" target.guid="_46948758-78c1-402b-84a7-8ccd2c958371">(a)</intref> does not apply if the tenderer is required to amend a development plan under the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.132" target.doc.id="act-2014-047" target.guid="_26c79e90-2508-4ad8-ac67-9fa8974ff3a3" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">section 132</legref> or <legref check="valid" jurisd="QLD" refid="sec.145" target.doc.id="act-2014-047" target.guid="_5e7cb7f9-fa81-4df5-9c6e-e412febeef9d" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">145</legref>; and</txt></block></li><li guid="_e149e876-31d9-4d87-bded-5240cb49d585" id="sec.844-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0"><intref check="valid" refid="sec.844-ssec.2" target.guid="_b64bee28-9864-4455-984e-a65ab9059bc5">subsection (2)</intref><intref check="valid" refid="sec.844-ssec.2-para1.b" target.guid="_6e475106-4981-45bc-b9a0-ce5aac7c67bb">(b)</intref> does not apply if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_56c62e28-ad13-46e8-ab62-daf10a013aa9" id="sec.844-ssec.3-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the tenderer is a corporation; and</txt></block></li><li guid="_b7802f1f-23e3-479f-b33a-deb9e57e9899" id="sec.844-ssec.3-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the change is only a change of name of the tenderer; and</txt></block></li><li guid="_3a7c2b0f-2c65-4ab9-8042-71f5e9a4ea72" id="sec.844-ssec.3-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">the tenderer’s Australian company number and Australian registered business name have not changed.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_452b7a61-bd45-4caf-8ed8-7fb715d5a5f1" id="sec.844-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If, under <intref check="valid" refid="sec.844-ssec.1" target.guid="_95fb1baf-000c-44ec-8c24-806504f334d9">subsection (1)</intref>, the application is amended to change the applicant, for the purpose of deciding the application, the applicant as changed is taken to have been the applicant from the making of the application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e6c616d4-197f-4d6b-98e6-4c59f3e6ec1e" id="sec.844-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_82bc6fa3-3c6e-43d4-a9cd-160aaffb16d0" id="sec.844-ssec.5-def.relevantperson_"><txt break.before="1"><defterm guid="_68b393f5-d358-4f27-9268-062df34f76e2" id="sec.844-ssec.5-def.relevantperson" type="definition">relevant person</defterm>, for an application under this Act, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3d82c452-f3a1-429d-b80a-762e08e977a2" id="sec.844-ssec.5-def.relevantperson-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the chief inspector, if the application is made under—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d78e50d1-cd48-4d11-960d-ea654e78aeee" id="sec.844-ssec.5-def.relevantperson-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0"><intref check="valid" refid="sec.622" target.guid="_f61e22bc-82ff-463d-b3ee-a75d9d0acbd2">section 622</intref> or <intref check="valid" refid="sec.728" target.guid="_e3961570-09cf-4364-9e76-16b518975aa0">728</intref>; or</txt></block></li><li guid="_268f0b15-8c08-4060-a7bc-4f2559b09063" id="sec.844-ssec.5-def.relevantperson-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0"><intref check="valid" refid="ch.9" target.guid="_e115e3d8-9707-4c5d-b3e6-be71f8d522ee">chapter 9</intref>, <intref check="valid" refid="ch.9-pt.1" target.guid="_f7270c11-7622-46a5-8996-bea8d3855f8c">part 1</intref>; or</txt></block></li></list></block></li><li guid="_145ef65f-698a-4508-a988-ca741ff6b2fa" id="sec.844-ssec.5-def.relevantperson-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—the chief executive.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7a1a35a1-f15a-4e0d-9fda-75368645b812" id="sec.845" provision.type="other" spent.amends="0"><no>845</no><heading guid="_402079c6-aa26-485a-9cae-799ddced0284" id="sec.845-he">Withdrawal of application</heading><subclause affected.by.uncommenced="0" guid="_0fe8d3b5-8631-48e0-9857-7c3ba7b1ddd0" id="sec.845-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person who has made an application under this Act may lodge a notice withdrawing the application at any time before the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c8130e58-7e6d-452f-9763-47bb893d3266" id="sec.845-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">generally—before the application is decided;</txt></block></li><li guid="_4a4a582b-e4d6-4b32-bafa-9f9f3f2cc79a" id="sec.845-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for a petroleum authority—the granting of the authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d0e6b0fa-6e7d-4ec9-8057-d1c7a04d2e5d" id="sec.845-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The withdrawal takes effect when the notice is lodged.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7b29e426-57d4-4218-a9d7-f26c62c9d4d4" id="sec.845-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the applicant is a preferred tenderer for a call for tenders under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, the withdrawal does not affect the Minister’s power to appoint another tenderer from the tenders made in response to the call to be the preferred tenderer.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_13711718-4175-43b1-bc1d-c30c5b869165" id="sec.845-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the application is a tender in response to a call for tenders, the Minister may, if the Minister considers it reasonable in the circumstances, retain the whole or part of any tender security given by the tenderer.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_609db111-375c-47c9-b648-fd65322b51c5" id="sec.846" provision.type="other" spent.amends="0"><no>846</no><heading guid="_bde08876-f61d-4456-ab6c-1ddc51c79dfb" id="sec.846-he">Minister’s power to refund application fee</heading><block><txt break.before="1">If an application under this Act is withdrawn, the Minister may refund all or part of any fee paid for the application.</txt></block></clause></part><part affected.by.uncommenced="0" guid="_efd12bf3-ddcd-468a-8047-3c6b08da5b9e" id="ch.14-pt.2"><no>Part 2</no><heading guid="_eb2b2971-8410-49a4-acf7-48162ea8767a" id="ch.14-pt.2-he">Miscellaneous provisions for all authorities under Act</heading><clause affected.by.uncommenced="0" guid="_90cb28f9-ffdc-4d99-acee-b45240123c12" id="sec.847" provision.type="other" spent.amends="0"><no>847</no><heading guid="_78c05472-de21-40cc-b466-66bbf4fb6168" id="sec.847-he">Application of <intref check="valid" refid="ch.14-pt.2" target.guid="_efd12bf3-ddcd-468a-8047-3c6b08da5b9e">pt 2</intref></heading><block><txt break.before="1">This part applies for any authority under this Act.</txt></block></clause><clause affected.by.uncommenced="0" guid="_854ad862-1041-4141-9139-09cae4f9c00a" id="sec.848" provision.type="other" spent.amends="0"><no>848</no><heading guid="_63b24354-df90-457a-b7d7-a5b7df0e017b" id="sec.848-he">Power to correct or amend</heading><subclause affected.by.uncommenced="0" guid="_acd05a96-f0ad-4a3b-b258-42bfa724907e" id="sec.848-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">An official may, at any time, amend an authority to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_229073bb-b503-47ce-8000-1293ea1c1289" id="sec.848-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">correct a clerical error; or</txt></block></li><li guid="_7cdbbe3e-e8e0-422a-a69f-da1d57788c01" id="sec.848-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for a petroleum authority—state, or more accurately state, the boundaries of the area of the authority because of a survey carried out under <intref check="valid" refid="sec.558" target.guid="_4049be23-e294-464b-b1ff-e33c11376c04">section 558</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7f2b7406-aa2b-4e6b-b90d-da4413cffe8a" id="sec.848-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An amendment under <intref check="valid" refid="sec.848-ssec.1" target.guid="_acd05a96-f0ad-4a3b-b258-42bfa724907e">subsection (1)</intref> takes effect when notice of the amendment is given to the authority holder.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1c65442e-dbe4-4e8a-8921-ab5101b61902" id="sec.848-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive must record in the register the details of an amendment made under <intref check="valid" refid="sec.848-ssec.1" target.guid="_acd05a96-f0ad-4a3b-b258-42bfa724907e">subsection (1)</intref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c474d3ea-c099-41ba-9cf4-9c12eb784469" id="sec.848-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Also, an official may, at any time, amend a condition of an authority if the authority holder agrees in writing to the amendment.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_12c25354-2320-4837-b557-2ac60a3aec91" id="sec.848-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Despite <intref check="valid" refid="sec.848-ssec.1" target.guid="_acd05a96-f0ad-4a3b-b258-42bfa724907e">subsections (1)</intref> and <intref check="valid" refid="sec.848-ssec.4" target.guid="_c474d3ea-c099-41ba-9cf4-9c12eb784469">(4)</intref>, the following can not be amended under this section—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_23020595-af9e-4e17-bc56-b9107c424da5" id="sec.848-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the mandatory conditions for that type of authority;</txt></block></li><li guid="_7981bfae-2edc-415a-b110-3b659c0902c9" id="sec.848-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the term of the authority;</txt></block></li><li guid="_d066b232-dc46-4c7f-b290-e16e49343edc" id="sec.848-ssec.5-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">any work program or development plan for the authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e0ba044c-cb9c-4eb4-9567-1986d2dd034e" id="sec.848-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">Also, the official can not amend the authority if the authority as amended would be inconsistent with a mandatory condition for that type of authority.</txt><note guid="_e82c6150-d221-4f87-8106-02e368c85c89" id="sec.848-ssec.6-note" type="example"><heading guid="_bac57aae-117e-426d-b5b9-dcbd8eb62fe3" id="sec.848-ssec.6-note-he">Note—</heading><block><txt break.before="1">See also <intref check="valid" refid="sec.377" target.guid="_406d23b0-5557-4a30-98ee-6efaecb6dec7">section 377</intref> (Interests of relevant coal or oil shale mining tenement holder to be considered).</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_89bcf26e-40f4-4309-9372-764ac0170eb4" id="sec.850" provision.type="other" spent.amends="0"><no>850</no><heading guid="_37ab50a1-48e7-4893-8b22-8e574e79e56d" id="sec.850-he">Joint and several liability for conditions and for debts to State</heading><block><txt break.before="1">If more than 1 person holds the authority each holder is jointly and severally—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2c102992-5e1b-4a74-a164-47b54d6cdf71" id="sec.850-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">responsible for complying with its conditions; and</txt></block></li><li guid="_f3333f0d-d696-46fc-9a86-4e3f3904c9c3" id="sec.850-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">liable for all debts payable under this Act and unpaid by the authority holder to the State.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_50f314aa-8f99-41fa-9de6-a7aff499d97f" id="sec.851" provision.type="other" spent.amends="0"><no>851</no><heading guid="_a8f64876-c6ea-48c3-ac3a-a6e46b034153" id="sec.851-he">Notice of authority or licence holder’s agents</heading><block><txt break.before="1">An official may refuse to deal with a person who claims to be acting as the authority holder’s agent, unless the holder has given the official notice of the agency.</txt></block></clause></part><part affected.by.uncommenced="0" guid="_3e1d1ded-2095-4953-89e4-92eb58a1347e" id="ch.14-pt.3"><no>Part 3</no><heading guid="_1cbc2d1f-687b-4dd5-aba4-2cdeaf99bd56" id="ch.14-pt.3-he">Other miscellaneous provisions</heading><clause affected.by.uncommenced="0" guid="_1bb215c0-29c7-436b-85d1-d8220a60416c" id="sec.851AA" provision.type="other" spent.amends="0"><no>851AA </no><heading guid="_0d011c6b-2ce1-4ff6-9aa8-6bfc7a86be2f" id="sec.851AA-he">Place or way for making applications or giving or lodging documents</heading><subclause affected.by.uncommenced="0" guid="_da6500a5-969e-46c9-b358-627db8606317" id="sec.851AA-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to any of the following under this Act—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2a7e89fb-d70f-4960-bd7e-525a7411f5bd" id="sec.851AA-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the making of an application;</txt></block></li><li guid="_53506fdb-0a43-4f52-ab3a-c86d391f9e8c" id="sec.851AA-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the giving of a document to the Minister, chief executive or chief inspector;</txt></block></li><li guid="_8afd2d75-5803-4944-a467-c33d8f022ebb" id="sec.851AA-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the lodging of a document.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1f84517e-efeb-4ae1-9506-4189fce31351" id="sec.851AA-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application or document may be made, given or lodged only—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a9d9e924-6e07-4b38-8ab5-7361bbec792c" id="sec.851AA-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">at the following place—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cd85505a-fed6-4a4f-ba1f-05a62a3a1b9f" id="sec.851AA-ssec.2-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the office of the department provided for under the relevant approved form for that purpose;</txt></block></li><li guid="_cb006a6e-867b-457f-9195-867477de2a43" id="sec.851AA-ssec.2-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the relevant approved form does not make provision as mentioned in <intref check="valid" refid="sec.851AA-ssec.2-para1.a-para2.i" target.guid="_cd85505a-fed6-4a4f-ba1f-05a62a3a1b9f">subparagraph (i)</intref> or if there is no relevant approved form—the office of the department notified on the department’s website; or</txt></block></li></list></block></li><li guid="_c535f7e9-7187-450e-b9e7-5d08168e5360" id="sec.851AA-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">in the way prescribed under a regulation.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_eeaf1dc0-58ac-4041-b5e0-c9b5479d40d9" id="sec.851AA-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Without limiting <intref check="valid" refid="sec.851AA-ssec.2" target.guid="_1f84517e-efeb-4ae1-9506-4189fce31351">subsection (2)</intref><intref check="valid" refid="sec.851AA-ssec.2-para1.b" target.guid="_c535f7e9-7187-450e-b9e7-5d08168e5360">(b)</intref>, the way prescribed under a regulation may include making, giving or lodging the application or document at another place.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_078d1094-1be4-4747-8a34-730f5e2116bc" id="sec.851AA-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">This section does not apply to the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_611fcf6f-8f47-46cb-a313-133e960a41d3" id="sec.851AA-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the making of an application to the Land Court;</txt></block></li><li guid="_945a31db-8306-4c10-8198-ce26398c8740" id="sec.851AA-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the making of an application for a warrant under <intref check="valid" refid="sec.748" target.guid="_600bed97-4933-4445-a318-f1de6fc56490">section 748</intref>;</txt></block></li><li guid="_47c2712e-6d50-41f7-87c2-367559d128d4" id="sec.851AA-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the giving of a document to which <intref check="valid" refid="ch.6" target.guid="_1179c65a-355e-4281-a616-c3e83927d1e4">chapter 6</intref>, <intref check="valid" refid="ch.6-pt.2" target.guid="_839c1c31-4ce5-4f5d-8a94-80d4918aa832">part 2</intref>, <intref check="valid" refid="ch.6-pt.2-div.6" target.guid="_7e6ed5a1-eb31-4305-81b7-e57f6d10d2b8">division 6</intref> applies;</txt></block></li><li guid="_4ac7214c-a670-46e9-9138-d6ea4a38c027" id="sec.851AA-ssec.4-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the lodging of any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_01d27cf6-de70-4c5c-b7c6-b25a5000cda6" id="sec.851AA-ssec.4-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a submission to a public road authority under <intref check="valid" refid="sec.427" target.guid="_41303dc3-d05d-4bad-ae05-0de6bb636ba4">section 427</intref>;</txt></block></li><li guid="_14adaaf3-c5e9-4f57-8d30-d21be2023473" id="sec.851AA-ssec.4-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a proposed later development plan for a converted lease under <intref check="valid" refid="sec.897" target.guid="_45af2d17-2af8-41f8-a47f-ebcba1136d51">section 897</intref>;</txt></block></li><li guid="_cc9a1117-fa86-4845-85b7-4c2311a61299" id="sec.851AA-ssec.4-para1.d-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">a statement under <intref check="valid" refid="sec.934A" target.guid="_8892a52e-2429-4e3b-b2f0-49ed1b380c81">section 934A</intref>;</txt></block></li><li guid="_78e8c7a3-01b8-404d-a88d-eeb87dee0a9e" id="sec.851AA-ssec.4-para1.d-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">a document that under this Act must be lodged electronically using the system for submission of reports made or approved by the chief executive.</txt></block></li></list></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7ceff62d-3663-499d-9d6e-dc3cc520909e" id="sec.851AB" provision.type="other" spent.amends="0"><no>851AB </no><heading guid="_1b3121cc-b672-4edc-aed5-c9349d18fbe8" id="sec.851AB-he">Period of effect of particular later work programs</heading><subclause affected.by.uncommenced="0" guid="_69e604d6-e029-4cc6-b753-0cb162349c8b" id="sec.851AB-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b4567e63-4680-4849-badd-1c315a56d2bb" id="sec.851AB-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before the commencement of this section, the holder of an authority to prospect was given, under <intref check="valid" refid="sec.58" target.guid="_dd1dd486-ead7-4d35-8973-4ac8d2b03e86">section 58</intref>, a notice (the <defterm guid="_6dbea49c-ffbe-4911-8949-2718b6d237dc" id="sec.851AB-ssec.1-def.notice" type="definition">notice</defterm>) of the approval of a proposed later work program for the authority; and</txt></block></li><li guid="_b889f472-5cc3-4d06-b4d0-e46f424e81d0" id="sec.851AB-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the notice was given to the holder of the authority after the start of the period of the proposed program as stated in the proposed program.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b77bc41b-859e-4d0e-af43-21d52b539628" id="sec.851AB-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For an Act, the approval has effect, and is taken to have had effect, from—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1a6c17fa-b300-464a-928b-c38f30bd6a13" id="sec.851AB-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the start of the period; or</txt></block></li><li guid="_58ba2006-a6f6-4577-a586-1a7b40d57dd5" id="sec.851AB-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the notice stated a later day of effect—the later day.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_78a24c93-d451-4481-83bb-8f5874af2ce1" id="sec.851AB-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The notice is, and is taken always to have been, valid and effective—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_280c59d3-04d4-414b-b5b0-6349e58657cf" id="sec.851AB-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">even though the notice was given after the commencement of the period stated for the proposed program; and</txt></block></li><li guid="_c2496d2c-d1f7-4eb9-8e52-e3264d492d2a" id="sec.851AB-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether or not the notice purported, expressly or impliedly, to approve the carrying out of work under the program before the approval was given; and</txt></block></li><li guid="_6cb46c24-be7d-424e-83ac-2778dd067083" id="sec.851AB-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">regardless of the extent to which <intref check="valid" refid="sec.57" target.guid="_9ee03665-c4ea-4aca-b97d-3ea968a14644">section 57</intref><intref check="valid" refid="sec.57-ssec.2" target.guid="_73f0c0d2-68a5-4841-8c77-5acf7d80caf5">(2)</intref><intref check="valid" refid="sec.57-ssec.2-para1.b" target.guid="_2d4826c9-f2b2-4142-a2a6-81f398e54fb7">(b)</intref> and <intref check="valid" refid="sec.57-ssec.2-para1.c" target.guid="_3dbb1adf-3f04-43d1-a84c-cc6075df73ff">(c)</intref> was complied with.</txt><note guid="_1a6deae8-b9de-46ad-8391-22cd8b254663" id="sec.851AB-ssec.3-para1.c-note" type="example"><heading guid="_dce6f4ce-a5cc-4f6d-a60a-0363b21a9c8f" id="sec.851AB-ssec.3-para1.c-note-he">Example for <intref check="valid" refid="sec.851AB-ssec.3-para1.c" target.guid="_6cb46c24-be7d-424e-83ac-2778dd067083">paragraph (c)</intref>—</heading><block><txt break.before="1">It does not matter if a work program was considered under <intref check="valid" refid="sec.57" target.guid="_9ee03665-c4ea-4aca-b97d-3ea968a14644">section 57</intref><intref check="valid" refid="sec.57-ssec.2" target.guid="_73f0c0d2-68a5-4841-8c77-5acf7d80caf5">(2)</intref><intref check="valid" refid="sec.57-ssec.2-para1.b" target.guid="_2d4826c9-f2b2-4142-a2a6-81f398e54fb7">(b)</intref> but was not current at the time of its consideration.</txt></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_25e47a7e-8340-411d-b97d-44e7c74b6c30" id="sec.851AB-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">This section applies despite <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.1" target.guid="_ae224c28-0e3b-4475-a663-d926bb3b8358">part 1</intref>, <intref check="valid" refid="ch.2-pt.1-div.3" target.guid="_68a7a1d9-c152-465c-9d27-7eebd1ad4060">division 3</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_df293f7d-ab90-49b8-b4a0-1a937e043146" id="sec.851AC" provision.type="other" spent.amends="0"><no>851AC </no><heading guid="_21e1f8fc-a021-4aed-95ba-4518d76fb312" id="sec.851AC-he">Period of effect of particular later development plans</heading><subclause affected.by.uncommenced="0" guid="_5341c933-a68e-42e1-a985-6c1539c288f0" id="sec.851AC-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c6571ea0-a245-48cb-bc3d-64d96a1b45a7" id="sec.851AC-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before the commencement of this section, the holder of a petroleum lease was given, under <intref check="valid" refid="sec.149" target.guid="_acf8c68b-60e8-4496-93e6-f0a7bc5e05ac">section 149</intref>, a notice (the <defterm guid="_54384549-7f3e-446e-a61a-e25f6d7269ce" id="sec.851AC-ssec.1-def.notice" type="definition">notice</defterm>) of the approval of a proposed later development plan for the lease; and</txt></block></li><li guid="_74f4d51c-f475-466b-9ac3-bfde2ce386b6" id="sec.851AC-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the notice was given to the holder of the lease after the start of the plan period for the proposed plan as stated in the proposed plan.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_e6b11170-eb74-4461-9a2c-6c8b662c228f" id="sec.851AC-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For an Act, the approval has effect, and is taken to have had effect, from—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_961027f6-f57b-4b8a-8773-46a15e0bc2c2" id="sec.851AC-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the start of the plan period; or</txt></block></li><li guid="_7058b368-f69b-481b-8388-edfa02e39659" id="sec.851AC-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the notice stated a later day of effect—the later day.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_adff19a7-9ce6-4ba4-9fa4-c3b348663cd0" id="sec.851AC-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The notice is, and is taken always to have been, valid and effective—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4bd66133-dff3-423e-9bc9-f45eb71f9da2" id="sec.851AC-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">even though the notice was given after the commencement of the plan period stated for the proposed plan; and</txt></block></li><li guid="_27995b17-0edc-42ed-aba8-62afc6e149f6" id="sec.851AC-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">whether or not the notice purported, expressly or impliedly, to approve the carrying out of work under the plan before the approval was given; and</txt></block></li><li guid="_71b413a3-db0c-4905-b971-62faf0c58871" id="sec.851AC-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">regardless of the extent to which <intref check="valid" refid="sec.147" target.guid="_9893cbfd-0dee-451b-add3-1032f946c4bd">section 147</intref><intref check="valid" refid="sec.147-ssec.2" target.guid="_3fb89ae9-f408-4fb3-86e4-d6591e8dae17">(2)</intref><intref check="valid" refid="sec.147-ssec.2-para1.b" target.guid="_a4530ed5-d381-4a0f-b347-57c84935af88">(b)</intref> was complied with.</txt><note guid="_6dbb28aa-caa4-46a9-a460-23489a02e65b" id="sec.851AC-ssec.3-para1.c-note" type="example"><heading guid="_71b7ad84-b38e-4cc4-8ed9-a240cd9d72d0" id="sec.851AC-ssec.3-para1.c-note-he">Example for <intref check="valid" refid="sec.851AC-ssec.3-para1.c" target.guid="_71b413a3-db0c-4905-b971-62faf0c58871">paragraph (c)</intref>—</heading><block><txt break.before="1">It does not matter if a development plan was considered under <intref check="valid" refid="sec.147" target.guid="_9893cbfd-0dee-451b-add3-1032f946c4bd">section 147</intref><intref check="valid" refid="sec.147-ssec.2" target.guid="_3fb89ae9-f408-4fb3-86e4-d6591e8dae17">(2)</intref><intref check="valid" refid="sec.147-ssec.2-para1.b" target.guid="_a4530ed5-d381-4a0f-b347-57c84935af88">(b)</intref> but was not current at the time of its consideration.</txt></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_07fafc11-af8f-4a99-8132-5680c5006a8a" id="sec.851AC-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">This section applies despite <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.2" target.guid="_f0429453-3af6-43cd-a6dd-cfc8b78be0a9">part 2</intref>, <intref check="valid" refid="ch.2-pt.2-div.4" target.guid="_20042571-c618-44c9-9361-f8620ebcf824">division 4</intref>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_20ee3f24-6202-4232-8936-8b4234590c4a" id="sec.851AD" provision.type="other" spent.amends="0"><no>851AD </no><heading guid="_eedd75af-3b73-4049-8422-5d68cb1f8167" id="sec.851AD-he">Extended period for applying to change production commencement day</heading><subclause affected.by.uncommenced="0" guid="_952d567e-31a5-4df7-9b17-4d108af479bf" id="sec.851AD-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a petroleum lease states a production commencement day for the lease, and—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_990b72f4-d919-4f98-bc4c-7593c9a7096b" id="sec.851AD-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before the commencement of this section, the holder of the lease—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_10dc0d5d-791c-4ffd-a477-b04800232b8f" id="sec.851AD-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">did not start petroleum production under the lease so as to comply with <intref check="valid" refid="sec.154" target.guid="_480bb62b-8b18-47ac-9d79-897b1c68b4b0">section 154</intref><intref check="valid" refid="sec.154-ssec.1" target.guid="_7cd03659-77bc-4301-9f03-3a9113ecabfa">(1)</intref>; and</txt></block></li><li guid="_37e46ac3-1d57-4fa6-a6a6-8f1b45aa927b" id="sec.851AD-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">did not make an application under <intref check="valid" refid="sec.175AA" target.guid="_09555f61-640e-4761-b800-18d4c82e53c2">section 175AA</intref> to change the production commencement day for the lease; or</txt></block></li></list></block></li><li guid="_c23d98b9-03ee-4143-b50a-f231da663d9a" id="sec.851AD-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">on the commencement of this section, the holder of the lease—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bfa83831-f22f-4224-9273-202a8a3f9053" id="sec.851AD-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">reasonably considers the holder is unlikely to be able to start petroleum production under the lease so as to comply with <intref check="valid" refid="sec.154" target.guid="_480bb62b-8b18-47ac-9d79-897b1c68b4b0">section 154</intref><intref check="valid" refid="sec.154-ssec.1" target.guid="_7cd03659-77bc-4301-9f03-3a9113ecabfa">(1)</intref> unless the production commencement day for lease is changed to a later date; and</txt></block></li><li guid="_753c2213-999c-4db7-8fb6-f30db8b4dba3" id="sec.851AD-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">either—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_13141dc9-9786-4d0c-a707-8fdf7b9c9d47" id="sec.851AD-ssec.1-para1.b-para2.ii-para3.A" provision.type="other"><no>(A)</no><block><txt break.before="0">is unable to make an application under <intref check="valid" refid="sec.175AA" target.guid="_09555f61-640e-4761-b800-18d4c82e53c2">section 175AA</intref> to change the production commencement day because the conditions under that section for making the application can not be complied with; or</txt></block></li><li guid="_a9d1ecf6-5b95-4575-8607-3c4a80963197" id="sec.851AD-ssec.1-para1.b-para2.ii-para3.B" provision.type="other"><no>(B)</no><block><txt break.before="0">reasonably considers the holder is unlikely to be able make a suitable application under <intref check="valid" refid="sec.175AA" target.guid="_09555f61-640e-4761-b800-18d4c82e53c2">section 175AA</intref> in the time remaining before the start of 1 year, or shorter prescribed period, mentioned in <intref check="valid" refid="sec.175AA" target.guid="_09555f61-640e-4761-b800-18d4c82e53c2">section 175AA</intref><intref check="valid" refid="sec.175AA-para1.b" target.guid="_98384440-6619-4a88-89cd-03b4c53a79fc">(b)</intref>.</txt></block></li></list></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8bc9d37f-4942-451b-afb1-dfbc0d0d47a3" id="sec.851AD-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite <intref check="valid" refid="sec.175AA" target.guid="_09555f61-640e-4761-b800-18d4c82e53c2">section 175AA</intref><intref check="valid" refid="sec.175AA-para1.b" target.guid="_98384440-6619-4a88-89cd-03b4c53a79fc">(b)</intref>, the holder may apply under <intref check="valid" refid="sec.175AA" target.guid="_09555f61-640e-4761-b800-18d4c82e53c2">section 175AA</intref> in relation to the production commencement day for the lease, but only if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e3d4f367-339b-45e4-a370-2d14df507e0f" id="sec.851AD-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the application is made no later than 6 months after the commencement of this section; and</txt></block></li><li guid="_d6cc9068-b671-4329-979e-e3e1b693baa4" id="sec.851AD-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the application otherwise complies with <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.2" target.guid="_f0429453-3af6-43cd-a6dd-cfc8b78be0a9">part 2</intref>, <intref check="valid" refid="ch.2-pt.2-div.7" target.guid="_2bb22cfe-e8d5-4c9d-9726-0c2f089841e4">division 7</intref>, <intref check="valid" refid="ch.2-pt.2-div.7-sdiv.3" target.guid="_f240efae-effa-4c4c-bd0d-a4fe4219422d">subdivision 3</intref>.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2ecf602a-eb55-42e4-b33c-89b713460bb3" id="sec.851AD-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The holder of the petroleum lease is taken not to be in breach of the holder’s obligation under <intref check="valid" refid="sec.154" target.guid="_480bb62b-8b18-47ac-9d79-897b1c68b4b0">section 154</intref><intref check="valid" refid="sec.154-ssec.1" target.guid="_7cd03659-77bc-4301-9f03-3a9113ecabfa">(1)</intref> until—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e4991591-805b-402d-b2af-a11392b66dcd" id="sec.851AD-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if an application under <intref check="valid" refid="sec.175AA" target.guid="_09555f61-640e-4761-b800-18d4c82e53c2">section 175AA</intref> is not made as provided for under <intref check="valid" refid="sec.851AD-ssec.2" target.guid="_8bc9d37f-4942-451b-afb1-dfbc0d0d47a3">subsection (2)</intref>—the 6 months mentioned in <intref check="valid" refid="sec.851AD-ssec.2" target.guid="_8bc9d37f-4942-451b-afb1-dfbc0d0d47a3">subsection (2)</intref><intref check="valid" refid="sec.851AD-ssec.2-para1.a" target.guid="_e3d4f367-339b-45e4-a370-2d14df507e0f">(a)</intref> ends; or</txt></block></li><li guid="_867fbf59-8940-4c0b-88c0-795329f3908f" id="sec.851AD-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if an application under <intref check="valid" refid="sec.175AA" target.guid="_09555f61-640e-4761-b800-18d4c82e53c2">section 175AA</intref> is made as provided for under <intref check="valid" refid="sec.851AD-ssec.2" target.guid="_8bc9d37f-4942-451b-afb1-dfbc0d0d47a3">subsection (2)</intref>—the Minister decides, under <intref check="valid" refid="sec.175AC" target.guid="_5586affa-d80c-49ef-8251-aab54675e72c">section 175AC</intref>, whether to change the production commencement day to a new day, and the decision is not appealed or, if there is an appeal, the appeal is finalised.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_cae9dbde-52d3-43f7-adad-449094517f45" id="sec.851A" provision.type="other" spent.amends="0"><no>851A</no><heading guid="_9410f40d-a056-4ac3-8aef-cb8b633bef68" id="sec.851A-he">Public statements</heading><subclause affected.by.uncommenced="0" guid="_bb2b061f-52f9-49ed-bad3-2daf4c8115a8" id="sec.851A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister, chief executive, <del xml:space="preserve">commissioner</del><ins xml:space="preserve">CEO</ins> or chief inspector may make or issue a public statement identifying, and giving information about, the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c931d62f-d8f3-4f5f-bdd0-9370d00e57a9" id="sec.851A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the commission of offences against this Act and the persons who commit the offences;</txt></block></li><li guid="_179a61bd-146d-4630-9668-a428afa2a664" id="sec.851A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">investigations conducted under this Act;</txt></block></li><li guid="_9237e3f2-6a39-4529-971e-1c830ad69782" id="sec.851A-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">action taken by inspectors or authorised officers to enforce this Act.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_218090a3-eaf9-4808-b476-ebb2f47c3fb6" id="sec.851A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The statement may identify particular offences and persons.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7384917c-1c7c-4654-bbe1-3943f36ba80b" id="sec.851A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister, chief executive, <del xml:space="preserve">commissioner</del><ins xml:space="preserve">CEO</ins> or chief inspector must not issue a public statement under this section unless satisfied that it is in the public interest to do so.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7dddcd78-a4f9-4e39-a4f3-36d96d356146" id="sec.851A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">No liability is incurred by the State for anything done in good faith for the purpose of issuing a public statement under this section.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e9935a58-fc04-46d0-ba24-8f170ab40c0b" id="sec.851A-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">No liability is incurred by a person for publishing, in good faith, information that has been included in a public statement under this section.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ed1388e2-7382-489d-b9b1-3f9e8e74f948" id="sec.851A-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_3ae56f74-8da1-4128-8c3f-279a9be120d5" id="sec.851A-ssec.6-def.liability_"><txt break.before="1"><defterm guid="_89768444-b611-4b47-84b5-8af1dba8a510" id="sec.851A-ssec.6-def.liability" type="definition">liability</defterm> includes liability in defamation.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_eb9937e4-65ee-41f1-9f29-47869457907d" id="sec.852" provision.type="other" spent.amends="0"><no>852</no><heading guid="_ffbe2c1b-a538-41ee-9497-40982e04052e" id="sec.852-he">Name and address for service</heading><subclause affected.by.uncommenced="0" guid="_64a11eed-2825-4af8-b3ae-bb40bcdd30df" id="sec.852-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person (the <defterm guid="_c9c922cd-5954-4063-8161-573cf13851d6" id="sec.852-def.firstperson" type="definition">first person</defterm>) may, by a signed lodged notice, nominate another person (a <defterm guid="_e0d70b01-81bd-4f1c-93de-ce9748f093f9" id="sec.852-def.nominatedperson" type="definition">nominated person</defterm>) at a stated address as the first person’s address for service for this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d3799e22-028e-4a5e-9ec9-c652fac8e562" id="sec.852-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If this Act requires or permits any official to serve a notice or other document on the first person, it may be served on the first person by serving it on the last nominated person, at the stated address for that person.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1c430d07-13ec-43a1-aaad-fd2b1bc9d18a" id="sec.852-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_345ef550-6172-4a77-8203-16cdba8d7e8e" id="sec.852-ssec.3-def.serve_"><txt break.before="1"><defterm guid="_0882729e-23eb-44c4-8b39-d2042cb236a3" id="sec.852-ssec.3-def.serve" type="definition">serve</defterm> includes give.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_766a8451-be16-448f-bcaf-e2e7b815d7ff" id="sec.853" provision.type="other" spent.amends="0"><no>853</no><heading guid="_ceffb85a-ad5a-4a0b-8190-4398e788cd67" id="sec.853-he">Additional information about reports and other matters</heading><subclause affected.by.uncommenced="0" guid="_338a4b70-cd0a-465f-85a6-419c76d3fb37" id="sec.853-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f80d2588-b368-478c-8f2f-1cf58b2c69ef" id="sec.853-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a person is required under this Act to lodge a notice or copy of a document, a report or information (the <defterm guid="_3c227ba5-e15c-45ad-9ae6-a476a621382f" id="sec.853-ssec.1-def.advice" type="definition">advice</defterm>) with an official; and</txt></block></li><li guid="_259fe6c3-4654-4773-92c2-33339711af17" id="sec.853-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the person gives the advice.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2065fa8d-f205-419e-ae35-200be5ee2bd9" id="sec.853-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The official may, by notice, require the person to give, within the reasonable time stated in the notice, written information about the matter for which the advice was given.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0b4cc34c-3196-42d2-b941-13fe3f20e910" id="sec.853-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The person must comply with the notice.</txt></block><penalty guid="_dc7324e8-2904-483f-9944-76f347dc1b01" id="sec.853-ssec.3-pen"><block><txt break.before="1">Maximum penalty for <intref check="valid" refid="sec.853-ssec.3" target.guid="_0b4cc34c-3196-42d2-b941-13fe3f20e910">subsection (3)</intref>—500 penalty units.</txt></block></penalty></subclause></clause><clause affected.by.uncommenced="0" guid="_e4595563-305d-4359-bade-c23e1814d87e" id="sec.854" provision.type="other" spent.amends="0"><no>854</no><heading guid="_50c8c300-970e-4492-ab2b-d53be8e4d9cc" id="sec.854-he">References to right to enter</heading><block><txt break.before="1">A right under this Act to enter a place includes the right to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_572b0f01-27b8-4537-90f1-1b8783e71ad3" id="sec.854-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">leave and re-enter the place from time to time; and</txt></block></li><li guid="_d031dc57-03f3-41c6-b232-767e713b10ae" id="sec.854-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">remain on the place for the time necessary to achieve the purpose of the entry; and</txt></block></li><li guid="_c0694ca7-5cff-4c00-b422-50b79a5a7de3" id="sec.854-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">take on the place equipment, materials, vehicles or other things reasonably necessary to exercise a power under this Act.</txt></block></li></list><note guid="_2b5f96d7-011a-412b-aae3-8cc5bbd8fb57" id="sec.854-note" type="example"><heading guid="_0fc51406-7d9d-402a-b643-88d240ef49b6" id="sec.854-note-he">Note—</heading><block><txt break.before="1">For who may exercise a right of a petroleum authority holder to enter a place, see also <intref check="valid" refid="sec.563" target.guid="_67d472c3-9467-468b-8bb0-c21101321b5e">section 563</intref>.</txt></block></note></block></clause><clause affected.by.uncommenced="0" guid="_9f4efd6a-8ee3-4578-a80e-0a6a937eaf98" id="sec.855" provision.type="other" spent.amends="0"><no>855</no><heading guid="_cef2508d-9af1-4b87-9e13-dbdeea10405d" id="sec.855-he">Application of provisions</heading><block><txt break.before="1">If a provision of this Act applies any of the following (the <defterm guid="_b8aa9fea-13a7-4074-8cd1-197d478807db" id="def.appliedlaw" type="definition">applied law</defterm>) for a purpose—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a085bd1a-63bf-451f-8385-3053fbcd258f" id="sec.855-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">another provision of this Act;</txt></block></li><li guid="_f47b3cc9-b755-4d40-81a8-5398e2ec1644" id="sec.855-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">another law;</txt></block></li><li guid="_7b41b238-e0be-4b69-8f50-f85197420a5d" id="sec.855-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a provision of another law;</txt></block></li></list></block><block><txt break.before="1">for that purpose, the applied law and any definition relevant to it apply, with necessary changes.</txt></block></clause><clause affected.by.uncommenced="0" guid="_f5016573-42e6-4369-b03d-fb203abb5183" id="sec.856" provision.type="other" spent.amends="0"><no>856</no><heading guid="_717bd838-98fd-4023-a109-c0ba3fb48b87" id="sec.856-he">Protection from liability for particular persons</heading><subclause affected.by.uncommenced="0" guid="_4235992a-0ca9-45c4-8646-3343bd8b35a7" id="sec.856-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person as follows (a <defterm guid="_17592f7d-a933-4a47-a4b6-5303796c1f4b" id="sec.856-def.designatedperson" type="definition">designated person</defterm>) does not incur civil liability for an act done, or omission made, honestly and without negligence under this Act—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_39c78367-a65e-4501-8101-c5ecde5aa9df" id="sec.856-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an official;</txt></block></li><li guid="_c5dd55d0-2fc3-4a47-8a44-a2478ee2d5eb" id="sec.856-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a public service officer or employee;</txt></block></li><li guid="_0718b0a9-a1f5-4ba7-b8e1-d147091d8a09" id="sec.856-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a contractor carrying out activities, relating to the administration of this Act, for the department;</txt></block></li><li guid="_16a3e122-c81b-44c0-a8f6-94950feb74a1" id="sec.856-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a person who is required to comply with a direction or requirement given under this Act and who is complying with the direction or requirement;</txt></block></li><li guid="_8ac1bc0c-ac97-440e-b061-14f159eab583" id="sec.856-ssec.1-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">a person authorised to carry out a remediation activity under <intref check="valid" refid="sec.294B" target.guid="_e8b2f72a-8645-41fd-900e-1eda6dd5cc11">section 294B</intref>;</txt></block></li><li guid="_a2c99480-c999-40fc-8a68-8fe69fb12790" id="sec.856-ssec.1-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">an authorised person carrying out remediation activities under <intref check="valid" refid="ch.10" target.guid="_c24d1b74-938d-44f7-b0f2-d23cd9205275">chapter 10</intref>, <intref check="valid" refid="ch.10-pt.3" target.guid="_ab9c9b86-73cb-4fe7-8c14-ab67d64b2ca8">part 3</intref>.</txt></block></li></list><note guid="_75802e61-6ab9-4aa4-87b9-2293e64786df" id="sec.856-ssec.1-note" type="example"><heading guid="_622cfe6d-b660-4774-9396-d8851d845cb2" id="sec.856-ssec.1-note-he">Example of an act done—</heading><block><txt break.before="1">giving information or advice</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_cd47392a-2444-49c1-be79-3d9a188f1b87" id="sec.856-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref check="valid" refid="sec.856-ssec.1" target.guid="_4235992a-0ca9-45c4-8646-3343bd8b35a7">subsection (1)</intref><intref check="valid" refid="sec.856-ssec.1-para1.a" target.guid="_39c78367-a65e-4501-8101-c5ecde5aa9df">(a)</intref>, it does not matter what is the form of appointment or employment of the person.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c5504242-d9b5-4cc4-8101-76ee186a9f7a" id="sec.856-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If <intref check="valid" refid="sec.856-ssec.1" target.guid="_4235992a-0ca9-45c4-8646-3343bd8b35a7">subsection (1)</intref> prevents a civil liability attaching to a designated person, the liability attaches instead to the State.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ad9d9aa7-de4a-4fdd-a892-16fbe8c0857d" id="sec.856-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_ea115de3-b54c-4605-b56c-b7b2a059e67b" id="sec.856-ssec.4-def.civilliability_"><txt break.before="1"><defterm guid="_4642a454-0f77-4f7d-b440-20552e4b6be8" id="sec.856-ssec.4-def.civilliability" type="definition">civil liability</defterm> includes liability for the payment of costs ordered to be paid in a proceeding for an offence against this Act.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f1a0d9a1-9858-4ba0-8edb-e012ae554f95" id="sec.857" provision.type="other" spent.amends="0"><no>857</no><heading guid="_1aa55129-f8c8-4f40-9d90-c72d523fce88" id="sec.857-he">Delegation by Minister, chief executive<ins xml:space="preserve">, CEO</ins> or chief inspector</heading><subclause affected.by.uncommenced="0" guid="_563a49a5-b197-4870-85ba-dbb6f3922496" id="sec.857-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Minister may delegate the Minister’s powers under this Act to<del xml:space="preserve">—</del><ins xml:space="preserve"> an appropriately qualified person.</ins></txt><list number.type="manual" unnumbered.indent="0"><li change="del" guid="_ae8cb26a-f959-4a62-af4a-faa1eecc4d9c-del" id="sec.857-ssec.1-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">an appropriately qualified public service officer or employee; or</txt></block></li><li change="del" guid="_d8a35788-e134-4c9f-8e0a-36df77fb19a1-del" id="sec.857-ssec.1-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">an appropriately qualified contractor carrying out activities, relating to the administration of this Act, for the department.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_b15ead6d-05ee-49c0-9b05-7e087e183e5f" id="sec.857-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may delegate the chief executive’s powers under this Act to <del xml:space="preserve">a person mentioned in <intref check="valid" refid="sec.857-ssec.1" target.guid="_563a49a5-b197-4870-85ba-dbb6f3922496">subsection (1)</intref></del><ins xml:space="preserve">an appropriately qualified person</ins>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fd8472ac-3465-4ec4-a9da-35ff0cadc7c4" id="sec.857-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief inspector may delegate the chief inspector’s powers under this Act to an <del xml:space="preserve">inspector or, with the Minister’s approval, a</del><ins xml:space="preserve">appropriately qualified</ins> person<del xml:space="preserve"> mentioned in <intref check="valid" refid="sec.857-ssec.1" target.guid="_563a49a5-b197-4870-85ba-dbb6f3922496">subsection (1)</intref></del>.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e70a01fb-d784-4b83-b079-66f280b9baa6" id="sec.858" provision.type="other" spent.amends="0"><no>858</no><heading guid="_9a6da69d-7e49-4fa3-85b4-0cf1ad2154e1" id="sec.858-he">Approved forms</heading><subclause affected.by.uncommenced="0" guid="_a5a4861a-b829-42cc-864a-f0dff9a3b0a2" id="sec.858-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may approve forms for use under this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_add03623-9412-40e2-8926-ff60a2f142b4" id="sec.858-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief inspector may approve forms for use under chapters 7 to 10.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ce89a152-c2e9-4a2a-8bf1-8f30cab97aa8" id="sec.858-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A form may be approved for use under this Act that is combined with, or is to be used together with, an approved form under another Act.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_4ddf675e-30f4-417c-9ed5-e99f7e6d41af" id="sec.859" provision.type="other" spent.amends="0"><no>859</no><heading guid="_a6e29ff3-a1d5-47a3-a033-e0347c02e4d8" id="sec.859-he">Regulation-making power</heading><subclause affected.by.uncommenced="0" guid="_87a903a9-d095-4995-ad95-caa9d67a6f4f" id="sec.859-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The Governor in Council may make regulations under this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9a492beb-1482-4fe1-8993-571502dad911" id="sec.859-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A regulation may be made about any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f926eac5-6fde-4f6e-a3c6-8212aa3eba1a" id="sec.859-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the fees payable under this Act, including late payment fees;</txt></block></li><li guid="_1252e82b-a4de-4615-a6f3-9bf13f14cdd3" id="sec.859-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">imposing a penalty for a contravention of a provision of a regulation of no more than 20 penalty units;</txt></block></li><li guid="_250f3cca-c16c-43e3-b0a9-3c954cbdcb27" id="sec.859-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the way an application or document must be made, given or lodged for <intref check="valid" refid="sec.851AA" target.guid="_1bb215c0-29c7-436b-85d1-d8220a60416c">section 851AA</intref><intref check="valid" refid="sec.851AA-ssec.2" target.guid="_1f84517e-efeb-4ae1-9506-4189fce31351">(2)</intref><intref check="valid" refid="sec.851AA-ssec.2-para1.b" target.guid="_c535f7e9-7187-450e-b9e7-5d08168e5360">(b)</intref>, or the way a copy of a record must be given for <intref check="valid" refid="sec.548" target.guid="_7f4216c9-707d-487d-a2d2-080a3ac15a07">section 548</intref><intref check="valid" refid="sec.548-ssec.2" target.guid="_10c0e48c-9f3b-4c9a-9afe-5cb795f8fbaa">(2)</intref><intref check="valid" refid="sec.548-ssec.2-para1.b" target.guid="_7bc60fc7-115d-4743-9bb7-beb0af8ce9ca">(b)</intref>, including, for example—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b54cb36a-c19f-4a28-aa60-d3799fa9a237" id="sec.859-ssec.2-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">practices and procedures for lodgement of applications and other documents; and</txt></block></li><li guid="_520ce879-5fef-40ef-b0ff-b9d299e8f752" id="sec.859-ssec.2-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">methods for acknowledging receipt of documents; and</txt></block></li><li guid="_d8991b3f-290f-47ed-9577-2beb063800c0" id="sec.859-ssec.2-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">methods for acceptance of the lodgement of documents; and</txt></block></li><li guid="_7755694e-2c45-4379-b75c-1872d78953c4" id="sec.859-ssec.2-para1.c-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">the time at which a document is taken to have been lodged, but only to the extent that this Act does not provide otherwise;</txt></block></li></list></block></li><li guid="_d1b406e6-ff73-4267-b2db-b8f74507efeb" id="sec.859-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">requiring lodgement of a hard copy of the application or document.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5659eda3-4128-4d09-93f3-187ffd23805b" id="sec.859-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">A regulation under this Act may be made in the same instrument as a regulation made under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>.</txt></block></subclause></clause></part></chapter><chapter affected.by.uncommenced="0" guid="_5715b228-7bee-4f64-9a68-deae34090b8e" id="ch.15"><no>Chapter 15</no><heading guid="_341b75c3-b600-4df4-8979-2b2e47140cbb" id="ch.15-he">Repeal, transitional and validation provisions</heading><part affected.by.uncommenced="0" guid="_088531d0-b7e4-4417-a301-e4e987cecdad" id="ch.15-pt.1"><no>Part 1</no><heading guid="_f8a18bda-0f4c-4724-bc20-9dca29072d88" id="ch.15-pt.1-he">Repeal of Gas (Residual Provisions) Act 1965</heading><clause affected.by.uncommenced="0" guid="_e427c77d-d161-4082-9299-f7aa637e0b8b" id="sec.860" provision.type="other" spent.amends="0"><no>860</no><heading guid="_72cb3645-be89-478f-aa7b-48ea8dc57517" id="sec.860-he">Repeal</heading><block><txt break.before="1">The Gas (Residual Provisions) Act <legref check="valid" jurisd="QLD" target.doc.id="act-1965-068" target.version.series="3854c22f-a82b-44b6-b1bd-ca9f6dd56dbf" type="act">1965 No. 68</legref> is repealed.</txt></block></clause></part><part affected.by.uncommenced="0" guid="_aa19c654-4192-489c-bcd6-4da3cf416e8d" id="ch.15-pt.2"><no>Part 2</no><heading guid="_779ad74b-45a0-4afc-8c1e-7da2251e0c2a" id="ch.15-pt.2-he">Transitional provisions for Repeal of Gas (Residual Provisions) Act 1965</heading><clause affected.by.uncommenced="0" guid="_c44f9809-c0cb-4e7e-86a8-f6a7f2128d3d" id="sec.861" provision.type="transitional" spent.amends="0"><no>861</no><heading guid="_b6e2c311-5392-49f2-b22e-8e3216974b9a" id="sec.861-he">Definitions for pt 2</heading><block><txt break.before="1">In this division—</txt><deflist><definition affected.by.uncommenced="0" guid="_ce5629b7-6538-4f6a-aa71-3aced5cd0d1b" id="sec.861-def.commencement_"><txt break.before="1"><defterm guid="_3ad5bb51-b7fc-42bf-a9a8-f722fe2fe589" id="sec.861-def.commencement" type="definition">commencement</defterm> means the day section 860 commences.</txt></definition><definition affected.by.uncommenced="0" guid="_f2bfc689-e6d2-4928-a514-055c68f7874e" id="sec.861-def.repealedAct_"><txt break.before="1"><defterm guid="_53790764-4d6e-4cfb-96e6-7901070eea62" id="sec.861-def.repealedAct" type="definition">repealed Act</defterm> means the repealed <legref check="valid" jurisd="QLD" target.doc.id="act-1965-068" target.version.series="3854c22f-a82b-44b6-b1bd-ca9f6dd56dbf" type="act"><name emphasis="yes">Gas (Residual Provisions) Act 1965</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_8aedc3be-66a0-4068-9cb0-b96b8a1ea2fe" id="sec.861-def.repealedregulation_"><txt break.before="1"><defterm guid="_f9a9c91e-9d13-48ce-83c5-3e68522af982" id="sec.861-def.repealedregulation" type="definition">repealed regulation</defterm> means the repealed <legref check="valid" jurisd="QLD" target.doc.id="sl-1989-grpr" target.version.series="2abb7efe-d515-4e09-94d4-77ee9b04a3dd" type="subordleg"><name emphasis="yes">Gas (Residual Provisions) Regulation 1989</name></legref>.</txt></definition></deflist></block></clause><clause affected.by.uncommenced="0" guid="_a7d32392-1842-49a9-9826-4d49f68d687a" id="sec.862" provision.type="transitional" spent.amends="0"><no>862</no><heading guid="_f8cab95c-6160-4914-839e-b8430551fb96" id="sec.862-he">Meters</heading><subclause affected.by.uncommenced="0" guid="_933c4a62-1db3-4356-bfe9-7cacd5f25057" id="sec.862-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to a meter operated under the repealed Act immediately before the commencement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_134f1b74-017f-49d6-b19b-fff2ae697be1" id="sec.862-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Chapter 8, part 2, does not apply to the meter until the later of following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_85d730c4-fa33-4567-8788-cd8d8c2d6a20" id="sec.862-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">6 months after the commencement;</txt></block></li><li guid="_6ad020ca-8745-45f4-a2ec-57415b317884" id="sec.862-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if a regulation made within the 6 months prescribes a later day—the later day.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_50191c4e-c2ca-4f82-bba9-b51fb02e29e0" id="sec.862-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The later day must not be later than 1 year after the commencement.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_911e1b8f-c0ae-48d0-b372-af2c76f1b3e4" id="sec.863" provision.type="transitional" spent.amends="0"><no>863</no><heading guid="_8ba07ee4-653c-468b-8052-d24b90a78fa2" id="sec.863-he">Applications to test meter correctness</heading><subclause affected.by.uncommenced="0" guid="_81bae7d0-7d24-4a17-916d-ab57bee18ba7" id="sec.863-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, immediately before the commencement, an application had been made under the repealed regulation, section 57, to have a meter tested and the test had not been carried out.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_986c5dbd-3c8f-4b0c-a780-bb9ae4692993" id="sec.863-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite their repeal, sections 57 and 58 of that regulation apply for the application, the test and its consequences, instead of chapter 8, part 5.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_9c93e049-15bc-4bc0-bc5f-1c9f61eb3a9b" id="sec.864" provision.type="transitional" spent.amends="0"><no>864</no><heading guid="_38c601df-2ac7-442d-a455-52c387755846" id="sec.864-he">Licences under repealed regulation that become gas work licences</heading><subclause affected.by.uncommenced="0" guid="_50c681b8-8303-4905-89e3-fb360a7a5d76" id="sec.864-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, immediately before the commencement, a person held a licence under the repealed regulation, section 83, and the licence (the <defterm guid="_bef994c2-7812-4d44-832a-69b10a48d6d1" id="sec.864-def.oldlicence" type="definition">old licence</defterm>) was—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2cdfbd64-a118-42d2-b74e-e918e69e3dd3" id="sec.864-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a gas installer’s licence; or</txt></block></li><li guid="_477749d1-8652-441a-b2db-45a83331ba18" id="sec.864-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a gas serviceman’s licence.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a151a496-1dcc-44c1-b4b3-520417a224f7" id="sec.864-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On the commencement, the old licence is taken to be a gas work licence for the same purpose as the old licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_91ccba7b-ddd0-47ce-a512-a482d22c9a02" id="sec.864-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Subject to chapter 10, part 2, division 4, the term of the gas work licence ends when the term of the old licence would have ended.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d6b062ba-b474-4e88-acc6-08e034169721" id="sec.865" provision.type="transitional" spent.amends="0"><no>865</no><heading guid="_56e04b77-cb15-45d3-ab6d-c5ec89e55bef" id="sec.865-he">Licences under repealed regulation that become gas work authorisations</heading><subclause affected.by.uncommenced="0" guid="_d20f586f-fc05-417f-8974-2e33b5d77cbe" id="sec.865-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, immediately before the commencement, a person held a licence under the repealed regulation, section 83, and the licence was—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_99b01409-2abe-4a97-97c1-dea47735be3a" id="sec.865-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a gas installer’s (advanced) licence; or</txt></block></li><li guid="_5f99181d-7493-4c3c-b1c0-95e1eb924d10" id="sec.865-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a gas motor fuel installer’s licence; or</txt></block></li><li guid="_f367247a-f8d5-4d83-9e17-149cd39bc31b" id="sec.865-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a gas suppliers inspector’s licence.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_56cc024b-509b-450d-99be-c4384631f3cb" id="sec.865-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On the commencement, the licence is taken to be an authorisation for the same purpose as the licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_10c52cee-d834-4154-8fe0-474b7b13949a" id="sec.865-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Subject to chapter 10, part 2, division 4, the term of the authorisation expires 12 months after the commencement.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_650046b3-b250-49b9-8dbb-56af4db1dc93" id="sec.866" provision.type="transitional" spent.amends="0"><no>866</no><heading guid="_0a187f51-4511-499c-a2fc-739bdf7d1027" id="sec.866-he">Applications for licence similar to gas work licence or authorisation</heading><subclause affected.by.uncommenced="0" guid="_44db94d7-e198-418c-843d-1c3031438f46" id="sec.866-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, immediately before the commencement, a licence application under the repealed regulation, section 84, had not been decided.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_65eed5d1-f272-40d7-80af-b6e71eb7961c" id="sec.866-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the application is for a type of licence mentioned in section 864 or 865, it is, on the commencement, taken to be an application for a gas work licence or authorisation for the same purpose under this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1e730900-ae8e-4561-93b6-7a83a0a97a2b" id="sec.866-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Otherwise, the application lapses and the application fee must be returned to the applicant.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_6d898677-a5d1-4ed7-80e4-7fb8cba5ec5e" id="sec.867" provision.type="transitional" spent.amends="0"><no>867</no><heading guid="_fe29f3fd-7ede-4be5-88bb-1aae09abe2e6" id="sec.867-he">Accidents</heading><subclause affected.by.uncommenced="0" guid="_31eef39e-a2ca-40bc-a155-3b1b4fb2aaf5" id="sec.867-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Despite its repeal, the repealed Act, as in force immediately before its repeal, continues to apply for an accident if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_785b3e67-28d8-4cad-a470-0aab98d00397" id="sec.867-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">it happened before the commencement; and</txt></block></li><li guid="_387de169-69af-4aff-b8c1-34203f31d950" id="sec.867-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">immediately before its repeal, <legref check="invalid" jurisd="QLD" refid="sec.10A" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">section 10A</legref> of that Act applied to the accident; and</txt></block></li><li guid="_9faac701-20a2-4309-b527-9a40a0ab9d13" id="sec.867-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a report on the accident had not been completed before the commencement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5863cd91-934b-4d96-be81-c7f35a4ff6f5" id="sec.867-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For applying subsection (1), a reference in the repealed Act to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f2ca9067-5ae8-49ea-b80c-4d9f22573fd4" id="sec.867-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the chief gas examiner is taken to be a reference to the chief inspector under this Act; and</txt></block></li><li guid="_9466aabd-841c-4c0c-b9dd-1967e96c5a06" id="sec.867-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a gas examiner is taken to be a reference to any inspector under this Act.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a17b7778-411e-412b-881d-8fef281397d2" id="sec.868" provision.type="transitional" spent.amends="0"><no>868</no><heading guid="_38ca3378-24ab-4c55-85c2-c19bb8d4b958" id="sec.868-he">Gas examiners</heading><subclause affected.by.uncommenced="0" guid="_8cf415a1-30a6-47a1-9064-56cacb4fa007" id="sec.868-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to a person who, immediately before the commencement, is, under the repealed Act, section 7—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1d1ae151-c7f1-4756-b3af-4c391f8b34d3" id="sec.868-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the chief gas examiner; or</txt></block></li><li guid="_a8a08268-0552-47e5-b49b-1191b92c20f7" id="sec.868-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the deputy chief gas examiner; or</txt></block></li><li guid="_4064285f-2898-4bcd-9086-47cd43ebd750" id="sec.868-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a gas examiner.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_619b78f9-df6e-4369-be4b-a80aa1aa0899" id="sec.868-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On the commencement, the person holds the appointment of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5785baba-116f-4731-8893-3659e6fb2862" id="sec.868-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the person was the chief gas examiner—the chief inspector; or</txt></block></li><li guid="_80c2e3ab-7961-4f40-847f-973f1043e364" id="sec.868-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the person was the deputy chief gas examiner—the deputy chief inspector; or</txt></block></li><li guid="_cf5cf917-aaca-46d7-94f7-e6e3b4ca8ae1" id="sec.868-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the person was a gas examiner—an inspector.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_77f8ed2e-5b88-4833-88f3-f583bc97d4db" id="sec.869" provision.type="transitional" spent.amends="0"><no>869</no><heading guid="_31fd970b-28df-4f34-a939-7d1e0d167985" id="sec.869-he">Gas examiners’ requirements under repealed Act, s 8</heading><subclause affected.by.uncommenced="0" guid="_84e12d7c-8d8e-4123-a3f0-6cab59642e6d" id="sec.869-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, immediately before the commencement—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2eab48ad-7eca-4280-bd13-5ed4bb1730bc" id="sec.869-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a gas examiner had given a person a requirement under the repealed Act, section 8; and</txt></block></li><li guid="_525daf5f-9cd6-4d99-a67f-187c1b68ead5" id="sec.869-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the requirement was still in force and had not been complied with.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_77da47d3-046a-42d9-ae4f-dfc968fb3de4" id="sec.869-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The requirement is, on the commencement, taken to be a dangerous situation direction given to the person on the commencement.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_6c7bb6d4-912b-48dd-9f73-6fef37448c19" id="sec.870" provision.type="transitional" spent.amends="0"><no>870</no><heading guid="_24282e04-7d4a-41e0-993a-4d331fef3660" id="sec.870-he">Gas examiners’ powers under repealed Act, s 8(1)(e)</heading><subclause affected.by.uncommenced="0" guid="_7748a026-c8af-4e2b-8e71-ae66ffcfc3d3" id="sec.870-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, before the commencement—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d8a8a622-4948-4340-8db8-739df10bdf8e" id="sec.870-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a gas examiner had seized and removed a substance under the repealed Act, section 8(1)(e); and</txt></block></li><li guid="_d11c6717-2835-4f81-901f-25ebc052e0ba" id="sec.870-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the substance has not been dealt with under that Act.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a4d7a313-aa33-4031-bc23-886b3d29a4f9" id="sec.870-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The repealed Act, section 8(1)(e), continues to apply for the substance.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_70925186-f556-4426-9793-8a0051c62cc3" id="sec.870-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For subsection (1)(a), an inspector under this Act is taken to be a gas examiner.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_fdba1c1e-51a9-4a88-ad7c-bbd90c3c4d3b" id="sec.871" provision.type="transitional" spent.amends="0"><no>871</no><heading guid="_bf9ff1bf-abd5-434d-a954-11303dd5a134" id="sec.871-he">Corresponding decisions under repealed Act</heading><block><txt break.before="1">A decision made under the repealed Act about a matter provided for under this Act that continues to have effect immediately before the commencement is, on the commencement, taken to be a decision made under this Act on the commencement.</txt></block></clause></part><part affected.by.uncommenced="0" guid="_7b6cfafe-1fa1-46dc-b544-e3327a0c144e" id="ch.15-pt.3"><no>Part 3</no><heading guid="_ac8375a8-c040-4a35-98b1-8494ac3d4cb5" id="ch.15-pt.3-he">Transitional provisions relating to <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref></heading><division affected.by.uncommenced="0" guid="_300f77dd-9ae6-4e8f-940b-a6eaba9c5f2e" id="ch.15-pt.3-div.1"><no>Division 1</no><heading guid="_20f8f7dd-12a6-4541-8e97-63f2f596eed4" id="ch.15-pt.3-div.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_2f17cfcb-ff78-4906-9656-cc26d8685e32" id="sec.872" provision.type="transitional" spent.amends="0"><no>872</no><heading guid="_0abd182b-5d22-4bf2-912b-de1d8fa0a72e" id="sec.872-he">Definitions for pt 3</heading><block><txt break.before="1">In this part—</txt><deflist><definition affected.by.uncommenced="0" guid="_c561142a-86e2-4212-aa9c-ec2ef2b1c5a8" id="sec.872-def.convertedATP_"><txt break.before="1"><defterm guid="_3b23f5be-ac6c-4437-bcc0-caefdd9438ff" id="sec.872-def.convertedATP" type="definition">converted ATP</defterm> see section 876(a).</txt></definition><definition affected.by.uncommenced="0" guid="_9ce8bf54-0542-4671-8ea2-2200a3664a5c" id="sec.872-def.convertedlease_"><txt break.before="1"><defterm guid="_6010e91b-42b6-4be8-9cf6-d790e7553240" id="sec.872-def.convertedlease" type="definition">converted lease</defterm> see section 894(a).</txt></definition><definition affected.by.uncommenced="0" guid="_59cd3290-9623-49bb-a0b9-9cb3d88b64c9" id="sec.872-def.convertedpetroleumauthority_"><txt break.before="1"><defterm guid="_0af93b8e-b604-4f03-86e1-0fa171568b1c" id="sec.872-def.convertedpetroleumauthority" type="definition">converted petroleum authority</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a4b90434-6bef-4d93-ba50-d572014af3cd" id="sec.872-def.convertedpetroleumauthority-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a converted ATP; or</txt></block></li><li guid="_fe3aefcb-f287-420d-91d6-fe09d0de413a" id="sec.872-def.convertedpetroleumauthority-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a converted lease; or</txt></block></li><li guid="_8b0fc89c-97ae-4fac-8ef3-26d6423a3b2e" id="sec.872-def.convertedpetroleumauthority-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">an entry permission that, under section 915, becomes a survey licence; or</txt></block></li><li guid="_ea3f5392-a3e4-4e8e-8594-cad35f7fca0a" id="sec.872-def.convertedpetroleumauthority-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a converted licence under section 916; or</txt></block></li><li guid="_8253ec00-5a91-4222-b5fe-e6a29715469e" id="sec.872-def.convertedpetroleumauthority-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">a refinery permission under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>, former section 66, that, under section 919 becomes a petroleum facility licence.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_791bc885-4492-4949-920a-4cd00fce3d7a" id="sec.872-def.convertedpetroleumtenure_"><txt break.before="1"><defterm guid="_457b07dd-6d8c-4234-b8ac-200c50b99b9a" id="sec.872-def.convertedpetroleumtenure" type="definition">converted petroleum tenure</defterm> means a converted ATP or converted lease.</txt></definition><definition affected.by.uncommenced="0" guid="_d558d709-d5a6-4415-be0e-9ff5caf16c07" id="sec.872-def.CSGrelated_"><txt break.before="1"><defterm guid="_d91eb750-a02b-4c4b-b172-1959e6f99894" id="sec.872-def.CSGrelated" type="definition">CSG-related</defterm>, for a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP, means a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP designated as ATP 337P, ATP 364P, ATP 553P or ATP 564P.</txt></definition><definition affected.by.uncommenced="0" guid="_423c0230-b527-4eab-8b02-577b7e7e3e10" id="sec.872-def.existingtenure_"><txt break.before="1"><defterm guid="_fbcb9ae8-71ea-4db2-ba1a-5d459c38e202" id="sec.872-def.existingtenure" type="definition">existing tenure</defterm> see section 908.</txt></definition><definition affected.by.uncommenced="0" guid="_7986c4df-2913-4e3e-8214-afd2e623bb91" id="sec.872-def.grantapplication_"><txt break.before="1"><defterm guid="_aeccfe9e-5afe-4c80-a296-3d53127faa0e" id="sec.872-def.grantapplication" type="definition">grant application</defterm> see section 908.</txt></definition><definition affected.by.uncommenced="0" guid="_1bce2ca1-c3fc-4c72-85fb-f5a4d9be6b59" id="sec.872-def.relevant1923ActATP_"><txt break.before="1"><defterm guid="_414ec194-b3da-4165-aa42-1a96e70c0822" id="sec.872-def.relevant1923ActATP" type="definition">relevant 1923 Act ATP</defterm>, for a converted ATP or a replacement tenure that is an authority to prospect, means the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease that the converted ATP or replacement tenure replaced, or is to replace.</txt></definition><definition affected.by.uncommenced="0" guid="_02e96f03-3da6-48d3-b1fe-845c0dfdebf7" id="sec.872-def.relevant1923ActATP_-oc.2"><txt break.before="1"><defterm guid="_4767190e-c175-41f8-bc8b-fe1b26771afa" id="sec.872-def.relevant1923ActATP-def.relevant1923ActATP" type="definition">relevant 1923 Act ATP</defterm>, for a converted lease or a replacement tenure that is a petroleum lease, means the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease that the converted lease or replacement tenure replaced, or is to replace.</txt></definition><definition affected.by.uncommenced="0" guid="_ab2ae193-d71c-4c69-9aee-32c32cfb6d57" id="sec.872-def.replacementtenure_"><txt break.before="1"><defterm guid="_3fa9e4b3-0906-459d-a419-853820434ce5" id="sec.872-def.replacementtenure" type="definition">replacement tenure</defterm> see section 908.</txt></definition></deflist></block></clause><clause affected.by.uncommenced="0" guid="_6522722a-6708-4ce1-b522-2c3a645f1a7e" id="sec.873" provision.type="transitional" spent.amends="0"><no>873</no><heading guid="_e1bc4337-3869-4e88-8858-5f1ec9a70cb9" id="sec.873-he">What is the <defterm guid="_ea8e8d26-f17d-4f2e-9a1e-813775ecb80f" type="mention">current term</defterm> of a converted ATP</heading><subclause affected.by.uncommenced="0" guid="_a3e8e0b9-c548-4410-ad45-c70a904dd44d" id="sec.873-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The <defterm guid="_6637ed46-da58-480a-b588-e6d3ddc85bd9" id="sec.873-def.currentterm-oc.2" type="definition">current term</defterm> of a converted ATP is the period that starts on the later of the following days and ends when it is first renewed after 31 December 2004—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_62088273-5fcb-4c1c-9451-bf14225993f9" id="sec.873-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the day the relevant <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP was granted;</txt></block></li><li guid="_5cdef8ee-f9ae-468e-a8b9-380f28d915ec" id="sec.873-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the day that the last renewal of the relevant <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP before 31 December 2004 became effective.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_4fc0c683-47df-4d33-8c4d-64204522ba70" id="sec.873-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, a relevant <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP granted between 1 January 1994 and 23 December 1996 ends on a day decided by the Minister.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5cc537ef-527c-4219-8be1-1bfa2d29d28c" id="sec.873-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For subsection (1)(b), a renewal of the relevant <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP is taken to have become effective on the day immediately after the end of its last term before the renewal.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_5d8e607f-83c4-4f41-82a7-8aa08c19f2bd" id="sec.874" provision.type="transitional" spent.amends="0"><no>874</no><heading guid="_1e3524ae-4497-4bdf-b516-41c3b9cd83e4" id="sec.874-he">What are the <defterm guid="_cf2fab2b-6689-4c8c-9eb2-c4718dc9022a" type="mention">transitional notional sub-blocks</defterm> for a converted ATP</heading><subclause affected.by.uncommenced="0" guid="_f60b7e14-89af-4925-9ea8-1eff1e8cbce4" id="sec.874-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The <defterm guid="_d252921d-c4d4-40d4-bbfd-1c291ae4b621" id="sec.874-def.transitionalnotionalsubblocks-oc.2" type="definition">transitional notional sub-blocks</defterm>, for a converted ATP, are the sub-blocks stated in the instrument for the converted ATP at the start of its current term.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1d479e00-d0c9-4e2c-ab83-39fd3459098b" id="sec.874-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the <defterm guid="_bdcb5378-a106-4fe0-96e5-97ece079ffde" id="sec.874-def.transitionalnotionalsubblocks-oc.3" type="definition">transitional notional sub-blocks</defterm> do not include any of the sub-blocks stated in the instrument that are completely within the area of a petroleum lease or <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4fe9efbb-5c04-4f8b-94ec-bf5c7a607bcb" id="sec.874-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For subsection (1), if the instrument—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cf040c49-f205-4d9d-bc58-463f705f2afa" id="sec.874-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">states that the area of the converted ATP includes land within a block; but</txt></block></li><li guid="_7227d039-46a7-4d0a-8532-00772e036964" id="sec.874-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">does not include or exclude any particular sub-block within that block;</txt></block></li></list></block><block><txt break.before="1">the reference to the block is a reference to all sub-blocks within the block, other than any sub-block that is completely within the area of another petroleum tenure or a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> petroleum tenure.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_7b0c82b3-81b5-4378-9ddf-a0577f55b3ba" id="ch.15-pt.3-div.2"><no>Division 2</no><heading guid="_834bf185-92a8-4937-9e40-f2800b796433" id="ch.15-pt.3-div.2-he">Conversion of particular <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATPs to an authority to prospect under this Act</heading><subdivision affected.by.uncommenced="0" guid="_ff5f1abe-ded8-4ba8-89c8-0eb4c4e09827" id="ch.15-pt.3-div.2-sdiv.1"><no>Subdivision 1</no><heading guid="_e3efec35-ca54-4d0a-ab32-c9ed1796a2bb" id="ch.15-pt.3-div.2-sdiv.1-he">Conversion provisions</heading><clause affected.by.uncommenced="0" guid="_dc94e0ef-bdec-4403-bc24-6688c366f505" id="sec.875" provision.type="transitional" spent.amends="0"><no>875</no><heading guid="_dd8cbbde-0c51-4dc8-b683-45e27c43d7f8" id="sec.875-he">Application of div 2</heading><block><txt break.before="1">This division applies to any <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP in force immediately before 31 December 2004 if it is not a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP as follows or a renewal of a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP as follows—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cf43c84e-dbce-47ab-b14a-241ceadd5c9a" id="sec.875-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP designated as ATP 212P, ATP 259P, ATP 267P, ATP 269P, ATP 299P, ATP 333P, ATP 336P, ATP 337P, ATP 364P, ATP 375P, ATP 470P, ATP 471P, ATP 526P, ATP 529P, ATP 539P, ATP 543P, ATP 545P, ATP 548P, ATP 549P, ATP 552P, ATP 553P, ATP 554P, ATP 556P, ATP 560P, ATP 564P or ATP 701P; or</txt></block></li><li guid="_debc4f8e-9070-4daf-a735-5090632d320d" id="sec.875-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP prescribed under a regulation notified before 31 December 2004.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_505d7571-6012-4dfa-aac9-9a21aca79bce" id="sec.876" provision.type="transitional" spent.amends="0"><no>876</no><heading guid="_1624f15d-c29d-4e28-b079-ba166e80d93b" id="sec.876-he">Conversion on 2004 Act start day</heading><block><txt break.before="1">On 31 December 2004—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3a33f0ec-3bf6-4257-b337-646bcb917f30" id="sec.876-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP ceases to be a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP and becomes an authority to prospect under this Act (a <defterm guid="_533d5bbb-e703-413d-8076-803b7ee703e2" id="sec.876-def.convertedATP" type="definition">converted ATP</defterm>); and</txt></block></li><li guid="_9bced64c-28c5-4f7f-b205-84ccfb8a364d" id="sec.876-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder of the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP is the holder of the converted ATP; and</txt></block></li><li guid="_aff19bd0-6025-42c0-bd31-45d3dfc8cd73" id="sec.876-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the conditions of the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP about expenditure or work become a later work program for the converted ATP; and</txt></block></li><li guid="_479f4ba6-9047-4ebb-88c0-bf6df2d2296a" id="sec.876-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the period to which the conditions apply is taken to be the plan period for the work program; and</txt></block></li><li guid="_cbc2bdc4-bd19-4ba4-b8b5-3f2f4eb18671" id="sec.876-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">any condition of the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP ceases to be a condition of the converted ATP if the condition is the same, or substantially the same, as any relevant environmental condition for the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP; and</txt></block></li><li guid="_b1a47f3a-ca87-40db-a719-51e9ed902cdd" id="sec.876-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">the converted ATP continues, subject to this Act, for the balance of the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP’s term; and</txt></block></li><li guid="_185d31ee-138f-462e-87c8-789eff1e903a" id="sec.876-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">the converted ATP is held subject to this Act and the conditions of the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP, as modified under this division; and</txt></block></li><li guid="_a573dd36-23e1-4526-acec-7499efd6eefa" id="sec.876-para1.h" provision.type="other"><no>(h)</no><block><txt break.before="0">the area of the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP becomes the area of the converted ATP.</txt></block></li></list></block></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_5b8a4564-b5e2-43d5-869b-749926fa98d2" id="ch.15-pt.3-div.2-sdiv.2"><no>Subdivision 2</no><heading guid="_9b1d8ac0-7db5-4acb-9591-964824356d09" id="ch.15-pt.3-div.2-sdiv.2-he">Special provisions for converted ATPs</heading><clause affected.by.uncommenced="0" guid="_47de7a9f-9ccd-4199-a2d0-1bd7b440a15d" id="sec.877" provision.type="transitional" spent.amends="0"><no>877</no><heading guid="_942175af-3d78-4ed2-8d43-407d728a148e" id="sec.877-he">Exclusion from area of land in area of coal mining lease or oil shale mining lease</heading><subclause affected.by.uncommenced="0" guid="_8a34ee56-6186-4d53-887f-eafe9e787453" id="sec.877-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to land if it—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3f2a880b-6a34-4155-8177-2eecf3a2fd51" id="sec.877-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is within any transitional notional sub-block of a converted ATP; and</txt></block></li><li guid="_f5dfc691-1fe5-4848-a9fc-aa946a83c040" id="sec.877-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">was, when the relevant <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP was granted, in the area of a coal or oil shale mining lease, whether or not the land was in the area of the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f591426e-5a12-4dcc-84a5-68a9fc43b9da" id="sec.877-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite section 98, the land—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0e557033-d0da-4884-ba5e-d86eb2b50906" id="sec.877-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">does not form part of the area of the converted ATP; and</txt></block></li><li guid="_fa080704-34d4-47d9-9ee1-c9dc66fb799d" id="sec.877-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is taken to be excluded land for the converted ATP.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_6d147341-6f34-4435-b3da-b73e519e5541" id="sec.878" provision.type="transitional" spent.amends="0"><no>878</no><heading guid="_dc3da466-a2c4-47e4-ac2d-c0b0387db334" id="sec.878-he">Relinquishment condition if converted ATP includes a reduction requirement</heading><subclause affected.by.uncommenced="0" guid="_a3e019e0-b2ea-4460-b94e-6c8d0175ecd3" id="sec.878-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a converted ATP requires its area to be reduced to a stated number of blocks on or before stated days.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_05ec7462-9266-4a80-8748-26d88e89a67a" id="sec.878-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Until the first renewal of the converted ATP after 31 December 2004—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e3d3da2d-8e9b-4682-b66f-762ca9992631" id="sec.878-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the requirement is the <defterm guid="_cb5939f4-6bf9-4b23-a89d-dba7d0a05cdb" id="sec.878-ssec.2-def.relinquishmentcondition" type="definition">relinquishment condition</defterm> for the converted ATP; and</txt></block></li><li guid="_4abc7925-0250-4af1-a860-a3182d57b505" id="sec.878-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the requirement applies instead of chapter 2, part 1, division 4, subdivision 2.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0e1fec51-6fdf-494c-8c4f-7e1341151e4a" id="sec.878-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the relinquishment condition is taken to include a requirement that, before the first renewal of the converted ATP after 31 December 2004, at least 5% of the transitional notional sub-blocks of the converted ATP must have been relinquished for each 12 month period of its current term.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_aa083efc-af73-4fb7-82df-22a5ed5ff407" id="sec.878-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Also, a relinquishment of a part of the area of the converted ATP that overlaps with the area of a lease under this Act or a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease can not be counted as a relinquishment for the relinquishment condition.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_4df7310e-4ece-4eaf-a43f-8106d8cd2249" id="sec.879" provision.type="transitional" spent.amends="0"><no>879</no><heading guid="_225add30-8e87-40cb-8e3a-516af6b12358" id="sec.879-he">Relinquishment condition if authority does not include a reduction requirement</heading><subclause affected.by.uncommenced="0" guid="_740ea91e-7a24-4360-92ac-bbcbe4d9ed2e" id="sec.879-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the authority does not include a requirement mentioned in section 878(1), the <defterm guid="_7458439e-33f4-477d-911a-9f99d47f6271" id="sec.879-def.relinquishmentcondition" type="definition">relinquishment condition</defterm> for the authority is the relinquishment condition under section 65, with the following changes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8f996405-c6b8-48a3-abd8-fb058527f96a" id="sec.879-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the required percentage is 5% instead of 8.33%;</txt></block></li><li guid="_dd8d766d-8dc5-422d-9c78-f642aabe75e5" id="sec.879-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the reference in section 66(2) to the authority originally taking effect is a reference to the start of its current term.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9065278c-7e53-4379-bf9d-f7266e2a607a" id="sec.879-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Chapter 2, part 1, division 4, subdivision 2 applies to the authority, subject to the changes under subsection (1).</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3399375f-7684-4a85-849a-78ebdd5e4ddf" id="sec.880" provision.type="transitional" spent.amends="0"><no>880</no><heading guid="_7b2062c4-b087-4d34-9691-4d26b57b2ca8" id="sec.880-he">Provision for conflicting conditions</heading><subclause affected.by.uncommenced="0" guid="_84773a13-5a09-4b66-911b-aa75aea8679d" id="sec.880-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a provision of a converted ATP conflicts with any of the following (the <defterm guid="_d3c1e44a-bc08-4e40-9b5c-4070aabaeb95" id="sec.880-def.overrulingprovision" type="definition">overruling provision</defterm>) the overruling provision prevails to the extent of the inconsistency—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1841848f-8fbb-4230-8c64-00c3dfd092f8" id="sec.880-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a provision of this Act;</txt></block></li><li guid="_08dbe51b-2c58-4477-bc4c-59c577638ff6" id="sec.880-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a mandatory condition for authorities to prospect under this Act;</txt></block></li><li guid="_612807fb-06e8-4485-bdc0-670eb9b8fea2" id="sec.880-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a relevant environmental condition for the converted ATP.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f9435344-c83a-4fce-a8d0-edd5a19942e5" id="sec.880-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, section 98(7) does not apply for the converted ATP.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c182563e-9b28-44c5-b209-c6b1c528dba1" id="sec.881" provision.type="transitional" spent.amends="0"><no>881</no><heading guid="_8d21a65b-45d8-45f2-ab29-81c7c334594d" id="sec.881-he">Additional conditions for renewal application</heading><subclause affected.by.uncommenced="0" guid="_8cf61baf-226a-4c3b-907e-7ad82364a118" id="sec.881-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies as well as section 81.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a6d9bec0-ec26-46cc-8408-9d98a75703e6" id="sec.881-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">A converted ATP holder can not apply to renew the converted ATP if section 878 applies and the relinquishment condition under that section has not been complied with.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_70a519f7-016a-47ec-8156-7458d82630b2" id="sec.881-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, to the extent the application is for a whole sub-block in the area of a petroleum lease or <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease, the application is invalid.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b2c46775-2e7c-4e1d-8b51-9c1006a75eac" id="sec.882" provision.type="transitional" spent.amends="0"><no>882</no><heading guid="_b1103625-8b76-4c5b-b46f-205a2b14ce7f" id="sec.882-he">Term of renewed converted ATP</heading><block><txt break.before="1">Despite section 85(7), a converted ATP may be renewed for a renewed term that ends no more than 12 years from—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_486b16c5-5ad0-44ce-8e85-5bb2c2eea689" id="sec.882-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the renewal decision is made before the end of the current term for the converted ATP—the end of the current term; or</txt></block></li><li guid="_625a93ba-c149-4099-b699-b315613acdba" id="sec.882-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the renewal decision is made after the end of the current term for the converted ATP—the day the decision is made.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_4263c853-5735-4121-bd1e-9c914e1898a5" id="sec.883" provision.type="transitional" spent.amends="0"><no>883</no><heading guid="_b1f6fc5f-6b35-4ec3-b52b-bf1daba2ba7e" id="sec.883-he">Exclusion of s 98(7) for any renewal</heading><block><txt break.before="1">Section 98(7) does not apply to a renewal of a converted ATP.</txt></block></clause><clause affected.by.uncommenced="0" guid="_3f33bf6b-31ef-42a4-9899-5dcbad4c1d7f" id="sec.884" provision.type="transitional" spent.amends="0"><no>884</no><heading guid="_7693c514-412d-4341-8816-5ec5089e70ed" id="sec.884-he">Existing renewal applications</heading><subclause affected.by.uncommenced="0" guid="_f252d7d6-358f-4a52-b2fb-2f69db7194d7" id="sec.884-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4788e1c2-224f-4ae9-be31-54e485e8d993" id="sec.884-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP is in force immediately before 31 December 2004; and</txt></block></li><li guid="_72cd8d22-9a45-4d37-9a7e-214433994dfb" id="sec.884-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">under section 876, the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP becomes a converted ATP on 31 December 2004; and</txt></block></li><li guid="_0f4ca9ef-3e95-45bb-8bd2-79be4c2f262a" id="sec.884-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">before 31 December 2004 an application to renew the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP had been made under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>, but the application had not been granted before that day.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c5bba377-d7b5-453a-836e-e266fa1a02fb" id="sec.884-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On 31 December 2004, the application is taken to be a renewal application for the converted ATP made under sections 81 and 82.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8bed6498-44a0-4e64-a2fa-08d44a45342f" id="sec.884-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Sections 882 and 883 apply to the renewal.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e13d93a7-aead-459d-b34f-d56c8810018a" id="sec.885" provision.type="transitional" spent.amends="0"><no>885</no><heading guid="_721327a6-becf-4c43-b0ba-8a9895c2483d" id="sec.885-he">Continued application of <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>, former s 22 to converted ATP for previous acts or omissions</heading><block><txt break.before="1">Despite its repeal the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>, former section 22, as it was in force immediately before 31 December 2004, continues to apply to a converted ATP for an act done or omission made in relation to the relevant <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP that happened before that day, as if the converted ATP were still a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP.</txt></block></clause></subdivision></division><division affected.by.uncommenced="0" guid="_7e927633-8199-4b30-999a-9247fac30007" id="ch.15-pt.3-div.3"><no>Division 3</no><heading guid="_44d96c30-1eb0-456a-bafd-d98eeb131fbc" id="ch.15-pt.3-div.3-he">Unfinished applications for <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATPs (other than applications for which a <legref check="invalid" jurisd="CTH" type="act"><name emphasis="no">Commonwealth Native Title Act</name></legref><intref check="valid" refid="sec.29" target.guid="_d20e002f-c415-4051-bfa8-5447f61eb769">s 29</intref> notice has been given)</heading><clause affected.by.uncommenced="0" guid="_d902828e-0db0-4550-a682-620bd48f166f" id="sec.886" provision.type="transitional" spent.amends="0"><no>886</no><heading guid="_251d7dbe-4b83-4d6c-b62a-bbfb594c9760" id="sec.886-he">Application of div 3</heading><block><txt break.before="1">This division applies for any <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP application if, immediately before 31 December 2004—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_019db5ee-2c21-4b17-9056-ac4425574b8a" id="sec.886-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the application had not been granted or rejected; and</txt></block></li><li guid="_223b23b4-daa7-40aa-91ba-408158163b5e" id="sec.886-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a notice under the <legref check="invalid" jurisd="CTH" type="act"><name emphasis="no">Commonwealth Native Title Act</name></legref>, <legref check="invalid" jurisd="QLD" refid="sec.29" type="act">section 29</legref>, had not been given for the proposed <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP the subject of the application.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_425c7b36-9a82-4289-9eb2-6cf80c2ff7f9" id="sec.887" provision.type="transitional" spent.amends="0"><no>887</no><heading guid="_9634e5b5-8a9a-4012-9a65-58acb966c6a3" id="sec.887-he">Applications for which notice of intention to grant has been given</heading><subclause affected.by.uncommenced="0" guid="_78a60bc5-3656-4f7e-b65c-746060bc271e" id="sec.887-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, before 31 December 2004, the Minister gave the applicant a notice of intention to grant the applicant a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP, subject to stated requirements.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_47c3c834-7fc7-4655-9b69-fe5bec34e692" id="sec.887-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application is taken to be a tender, under chapter 2, part 1, division 2, for a proposed authority to prospect, made in response to a call for tenders for that proposed authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b8bcd0b9-c859-4704-b984-14b8926f0dbf" id="sec.887-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The closing time for the call is taken to have passed.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_88cdd4ba-4d85-412d-8aff-b663a28ba593" id="sec.887-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The applicant is taken to have been appointed, under section 39, as the preferred tenderer for the call.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_51e2420b-0cdd-400f-a3fb-3747be166ea3" id="sec.887-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The stated requirements are taken to be requirements made under section 40.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c884a9e1-4162-485f-91a1-39e1c5ec39ca" id="sec.888" provision.type="transitional" spent.amends="0"><no>888</no><heading guid="_8c35f13c-1b13-448c-aa5d-92dd921b22ac" id="sec.888-he">Applications in response to public notice</heading><subclause affected.by.uncommenced="0" guid="_0acc010a-0cd9-44aa-aa0f-b6115a9b4b8d" id="sec.888-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d82c2b4f-0bd8-4de7-a42f-ec2122313dea" id="sec.888-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a notice of intention to grant mentioned in section 887(1) had not been given before 31 December 2004; and</txt></block></li><li guid="_8c2fcae0-f60b-4a98-bbc3-a03ec18690a7" id="sec.888-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the application was made in response to a public notice, published by the Minister or the department, inviting applications for a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP; and</txt></block></li><li guid="_9c318ed1-b9dc-46cb-81a1-13a46b6fd4d0" id="sec.888-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the notice complies, or substantially complies with section 35(2).</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ed982004-dfec-4d0f-9017-01610a4b7e14" id="sec.888-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The public notice is taken to be a call for tenders for a proposed authority to prospect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a805036d-af4a-4c36-8e7d-82afa74c4995" id="sec.888-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The call is taken to have been made when the public notice was published.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_73453e0d-6586-4c18-a625-0e41463f9f73" id="sec.888-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The closing time for the call is taken to be the day stated in the public notice by which applications must be submitted.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_660379c1-788d-41ec-94be-dda654c93667" id="sec.888-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The application is taken to be a tender, under chapter 2, part 1, division 2, for the proposed authority, made in response to the call.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_75dac912-c9a8-44d0-be79-3d08ed480ef1" id="sec.889" provision.type="transitional" spent.amends="0"><no>889</no><heading guid="_156832e0-bcff-40f8-ad00-f988a7e62e8f" id="sec.889-he">Other applications made before introduction of Petroleum and Other Legislation Amendment Bill 2004</heading><subclause affected.by.uncommenced="0" guid="_d0aa34f3-53f8-44ce-9bd8-80cddadcbb68" id="sec.889-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the application—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_123cb52a-e7b9-42d9-bf16-025e45496c6a" id="sec.889-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">was made before the day the <legref check="invalid" jurisd="QLD" target.doc.id="bill-2004-###" target.version.series="65aa49fc-a190-4bcc-9150-73ae33863201" type="bill"><name emphasis="yes">Petroleum and Other Legislation Amendment Bill 2004</name></legref> was introduced into Parliament; and</txt></block></li><li guid="_623dce05-5417-4fb3-933e-5a00d208b456" id="sec.889-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is not an application to which section 887 or 888 applies;</txt></block></li></list></block><block><txt break.before="1">it is taken to be a tender, under chapter 2, part 1, division 2 for a proposed authority to prospect, made in response to a call for tenders for the proposed authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c65e9ba7-1a13-488b-8e4b-eafac68045b8" id="sec.889-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The closing time for the call is taken to be the day on which this subsection commenced.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_9549c4a1-5c69-49fb-bf6d-9618d2655068" id="sec.890" provision.type="transitional" spent.amends="0"><no>890</no><heading guid="_f267ade4-f49c-4c4d-9481-4b27f02dfdd6" id="sec.890-he">Lapsing of all other applications</heading><block><txt break.before="1">The application lapses on 31 December 2004 unless it is an application to which section 887, 888 or 889 applies.</txt></block></clause></division><division affected.by.uncommenced="0" guid="_6f1df7ba-5c99-443d-ac38-1f0301a936ea" id="ch.15-pt.3-div.4"><no>Division 4</no><heading guid="_f6489f4e-855f-44d4-b9d8-0f42a74bc16a" id="ch.15-pt.3-div.4-he">Transition, by application, from <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP to petroleum lease under this Act</heading><clause affected.by.uncommenced="0" guid="_02e28cdb-21f5-403a-8c40-5d9b380e7508" id="sec.891" provision.type="transitional" spent.amends="0"><no>891</no><heading guid="_b1c51240-a5e4-41e2-9fe5-e761af1267c6" id="sec.891-he">Right of <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP holder to apply for petroleum lease</heading><subclause affected.by.uncommenced="0" guid="_173329a6-80de-4839-b858-a551ce75316a" id="sec.891-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The holder of a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP may, after 31 December 2004, apply for a petroleum lease under this Act for all or part of the area of the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_85ff4b53-4019-4df2-98f7-673eae23f424" id="sec.891-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The application may include a request that excluded land for the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP be declared to be excluded land for the petroleum lease.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0e3feecc-9cce-43ad-bbc4-ea611d0a6530" id="sec.892" provision.type="transitional" spent.amends="0"><no>892</no><heading guid="_ae80a715-9c59-4c4a-91bd-6767cff0a1fc" id="sec.892-he">Provisions for deciding application and grant of petroleum lease</heading><subclause affected.by.uncommenced="0" guid="_b9b9e555-2560-4cf6-8c65-cadcd88d89af" id="sec.892-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The following provisions of this Act apply for the application as if a reference in the provisions to an authority to prospect included a reference to the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_68cf6c75-622c-46af-9c18-643d2b54ea12" id="sec.892-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">chapter 2, part 2, division 2, other than sections 120, 121 and 122;</txt></block></li><li guid="_0515ada8-f589-49da-8ad0-5bd802ab3840" id="sec.892-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">chapter 2, part 2, division 4;</txt></block></li><li guid="_68160feb-8693-487f-9a76-051bb4a0ad46" id="sec.892-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">chapter 2, part 2, division 7, subdivision 1;</txt></block></li><li guid="_30e78488-5968-4386-8cba-d9bc5768960f" id="sec.892-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">section 101.</txt></block></li></list><note guid="_6c9383a5-c5cc-4e1b-8596-4d3bf369cfa2" id="sec.892-ssec.1-note" type="example"><heading guid="_c0587e3d-fc31-417e-b5a0-91a51760bf18" id="sec.892-ssec.1-note-he">Note—</heading><block><txt break.before="1">Chapters 3 and 3A may also apply for the application. See sections 297 and 392AA.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_14fa3b5b-78db-4255-a78c-649baec7fa19" id="sec.892-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">This section does not limit division 7.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_5790e3af-675e-4738-9786-537988999923" id="ch.15-pt.3-div.5"><no>Division 5</no><heading guid="_bc3493f2-c07c-4cc9-86e2-c0bb8b1ce47c" id="ch.15-pt.3-div.5-he">Conversion of particular <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> leases to petroleum leases</heading><subdivision affected.by.uncommenced="0" guid="_a055aae5-c4ea-474f-8e53-4387f17f9031" id="ch.15-pt.3-div.5-sdiv.1"><no>Subdivision 1</no><heading guid="_871388c8-49a7-4d7f-a330-b3495042cdde" id="ch.15-pt.3-div.5-sdiv.1-he">Conversion provisions</heading><clause affected.by.uncommenced="0" guid="_cf47095a-7ac3-40c9-8e1f-d0a0bcfc97ef" id="sec.893" provision.type="transitional" spent.amends="0"><no>893</no><heading guid="_380a40e5-70db-48fa-9df1-295a7a57eb4f" id="sec.893-he">Application of sdiv 1</heading><block><txt break.before="1">This division applies to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bc9b5b42-7ece-4076-8af3-8d97a390a6b3" id="sec.893-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> leases numbered 194, 195, 198, 209, 219, 220 and 226; and</txt></block></li><li guid="_82fc3144-145b-46a5-9456-609fa427fc51" id="sec.893-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">another <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease prescribed under a regulation notified before 31 December 2004.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_204e1ff8-482e-4f8d-b8cf-9fbc1af7bdf5" id="sec.894" provision.type="transitional" spent.amends="0"><no>894</no><heading guid="_78fa6b31-9532-404d-bf53-98d2b66bba74" id="sec.894-he">Conversion on 2004 Act start day</heading><block><txt break.before="1">On 31 December 2004—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f969f022-2a63-4fb2-a979-385d7c214f99" id="sec.894-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease ceases to be a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease and becomes a petroleum lease under this Act (a <defterm guid="_5adc3bf5-c070-4fe8-a085-dc1ac5975b8d" id="sec.894-def.convertedlease" type="definition">converted lease</defterm>); and</txt></block></li><li guid="_0a3b3203-1ae4-4b49-8f1a-389831317bd5" id="sec.894-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder of the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease is the holder of the converted lease; and</txt></block></li><li guid="_c42a1a92-41aa-49ef-b542-09b7448f6ec9" id="sec.894-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the current program for development and production for the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease is taken to be the development plan for the converted lease; and</txt></block></li><li guid="_16073f72-6afb-4e8d-8273-ec592e9b13a9" id="sec.894-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">any condition of the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease ceases to be a condition of the converted lease if the condition is the same, or substantially the same as any relevant environmental condition for the converted lease; and</txt></block></li><li guid="_ed0e4e15-0228-4fe5-9560-f6d2e29513c3" id="sec.894-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the converted lease continues, subject to this Act, for the balance of the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease’s term; and</txt></block></li><li guid="_64bfe7a3-52a9-48c1-a3f1-767222546324" id="sec.894-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">the converted lease is held subject to this Act and the conditions of the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease, other than any condition mentioned in paragraph (d); and</txt></block></li><li guid="_65f8e261-8634-4204-a5de-ca26665e930d" id="sec.894-para1.g" provision.type="other"><no>(g)</no><block><txt break.before="0">the area of the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease becomes the area of the converted lease.</txt></block></li></list></block></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_339e4cfa-3140-4af1-9a68-a3e916bb1bdc" id="ch.15-pt.3-div.5-sdiv.2"><no>Subdivision 2</no><heading guid="_7512d847-7360-4238-a7fa-b92bdb646d58" id="ch.15-pt.3-div.5-sdiv.2-he">Special provisions for converted leases</heading><clause affected.by.uncommenced="0" guid="_2cda2b58-f4fc-42b1-a31f-e8beee8084dc" id="sec.895" provision.type="transitional" spent.amends="0"><no>895</no><heading guid="_cf8d90d3-04ee-471e-b419-2f17212b2bbb" id="sec.895-he">Provision for conflicting conditions</heading><subclause affected.by.uncommenced="0" guid="_9063f344-ed7c-4042-9781-49cf809a80b6" id="sec.895-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a provision of the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease conflicts with any of the following (the <defterm guid="_594d1012-9eb7-498b-9685-ca506b7bd28b" id="sec.895-def.overrulingprovision" type="definition">overruling provision</defterm>) the overruling provision prevails to the extent of the inconsistency—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8bc3e92e-ddcb-4155-9bef-8d36d6213fad" id="sec.895-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a provision of this Act;</txt></block></li><li guid="_82b6c519-1c14-43d7-8edf-24022a6d630d" id="sec.895-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a mandatory condition for petroleum leases under this Act;</txt></block></li><li guid="_d78f34cf-bab3-4ff9-86c0-08fb972ad8a7" id="sec.895-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a relevant environmental condition for the converted lease.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_21396835-5705-43bf-9870-2b1d53d3dc44" id="sec.895-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, section 168(6) does not apply to the converted lease or for any renewal of the lease.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_ccb06b89-2bca-4d6e-91a9-56c2332a2963" id="sec.896" provision.type="transitional" spent.amends="0"><no>896</no><heading guid="_958a4293-c5de-4618-b339-f81fd559a061" id="sec.896-he">Sunsetting of particular activities</heading><subclause affected.by.uncommenced="0" guid="_78d9b46d-7edd-4d72-9547-a02415552179" id="sec.896-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_87ac3407-ebe2-4bae-8e51-eaa9bfeaa4d0" id="sec.896-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an activity for a converted lease is provided for under the provisions of the lease; and</txt></block></li><li guid="_f3310bfc-50f2-4f74-81b8-851f6223043b" id="sec.896-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the activity was, under the relevant <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease, being carried out before 31 December 2004; and</txt></block></li><li guid="_6e0cb5ec-0a3f-451c-b4b4-7e60fc67aef4" id="sec.896-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the carrying out of the activity—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f545bc1a-9c1f-42db-b10f-71c9fc598f8b" id="sec.896-ssec.1-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">is, other than for this section, not an Act authorised activity for the converted lease; or</txt></block></li><li guid="_96b5dd8d-b843-4f48-92e1-43df774e1e22" id="sec.896-ssec.1-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">is inconsistent with an Act authorised activity.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f0c770d3-92a5-4080-915c-ad1b6da4add2" id="sec.896-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite the provisions of the lease or the definition of authorised activity in schedule 2, the activity is taken to be an authorised activity for the converted lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a82230eb-f4e3-48f0-8a6e-1952033e6152" id="sec.896-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Subsection (2) ceases to apply on the fifth anniversary of 31 December 2004.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8f3bbf8d-b2aa-48c6-b3e5-8453424d0b24" id="sec.896-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Subsection (2) applies whether or not the activity was being carried out immediately before 31 December 2004.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5741d81a-57a3-49cc-806a-8ce24834b89a" id="sec.896-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_36c35c06-3a1c-4888-a341-3f5324e39422" id="sec.896-ssec.5-def.Actauthorisedactivity_"><txt break.before="1"><defterm guid="_d1734a8f-8ea6-42f3-9cff-0cdccb16b596" id="sec.896-ssec.5-def.Actauthorisedactivity" type="definition">Act authorised activity</defterm> means an activity that, under a provision of this Act, is an authorised activity for a petroleum lease.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_45af2d17-2af8-41f8-a47f-ebcba1136d51" id="sec.897" provision.type="transitional" spent.amends="0"><no>897</no><heading guid="_654bce7d-db5a-4c1b-acdc-5e24a2f928a1" id="sec.897-he">Additional obligation of converted lease holder to lodge proposed later development plan</heading><subclause affected.by.uncommenced="0" guid="_5bee072f-236b-4be1-8cb7-6762a0a400ca" id="sec.897-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies, as well as section 159, to a converted lease holder.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0f8cbfe6-2f15-4f8c-a912-54b6d75a6d96" id="sec.897-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If any of the area of the converted lease is, on 31 December 2004, the subject of an application for a coal exploration tenement or coal mining lease, the holder must lodge a proposed later development plan for the converted lease before 6 months after 31 December 2004 (the <defterm guid="_b6dfd17d-e04b-4410-a90e-0479e1194d85" id="sec.897-def.relevanttime" type="definition">relevant time</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1455f561-068c-4503-8b64-1b5358ae0346" id="sec.897-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If, on 31 December 2004, the remaining term of the converted lease is 5 years or more, the holder must lodge a proposed later development plan for the converted lease before the first anniversary of the original grant of the relevant <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease that happens after 6 months after 31 December 2004 (also the <defterm guid="_b069be91-2410-40fe-9312-41b0ba8c71b7" id="sec.897-def.relevanttime-oc.2" type="definition">relevant time</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_cafc6560-dede-4752-912a-3c79ea736edf" id="sec.897-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The obligation under subsection (2) or (3) is complied with only if the proposed later development plan—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b786829c-12ff-499b-a030-f9f773826e8e" id="sec.897-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is lodged at—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5cd56c1e-f4d0-46b7-b033-aee5ce532b45" id="sec.897-ssec.4-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the office of the department for lodging proposed later development plans, as stated in a gazette notice by the chief executive; or</txt></block></li><li guid="_03b68acf-be66-4f7f-bc05-adb37623b81c" id="sec.897-ssec.4-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if no office is gazetted under subparagraph (i)—the office of the chief executive; and</txt></block></li></list></block></li><li guid="_8fe3480f-7ee3-4dd9-b66d-ca319a8d666b" id="sec.897-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">complies with the later development plan requirements; and</txt></block></li><li guid="_85f32d5e-2b56-4480-8fb2-4b715519900b" id="sec.897-ssec.4-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">is accompanied by the relevant fee.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_cf5dd5ad-1732-41e2-b5b2-878364e938a2" id="sec.897-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If, before the relevant time, a decision is made not to approve a proposed later development plan lodged under subsection (2) or (3), the holder may lodge another proposed later development plan before that time.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_373fae32-a2e0-4430-8a4e-7276c8f23982" id="sec.897-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">If the holder does not lodge any proposed later development plan before the relevant time—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_33c99c71-63d8-4903-8119-5c0a1be23f4f" id="sec.897-ssec.6-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the holder must be given a notice requiring the holder to lodge a proposed later development plan for the lease within 20 business days after the giving of the notice; and</txt></block></li><li guid="_f90391f9-6cb3-432c-884e-5a875df235ea" id="sec.897-ssec.6-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder must comply with the requirement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_16eff62f-5e1c-4b61-8f43-b360747d4f1f" id="sec.897-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">Chapter 2, part 2, division 4, subdivision 5 applies to a proposed later development plan lodged under this section.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_99cc446e-41df-4834-9cb8-50c1cb3d32f0" id="sec.897-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_e3544dc6-511a-4014-8361-53a864edab63" id="sec.897-ssec.8-def.relevantfee_"><txt break.before="1"><defterm guid="_c3e42a49-3370-4993-9881-eba09a16a222" id="sec.897-ssec.8-def.relevantfee" type="definition">relevant fee</defterm>, for the lodgement of the proposed plan, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ef3d75b2-68a5-448e-84b2-e5bd06370784" id="sec.897-ssec.8-def.relevantfee-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the proposed plan is lodged before the relevant time—the fee prescribed under a regulation; or</txt></block></li><li guid="_0ee96876-ee0b-433d-a012-bb396a758095" id="sec.897-ssec.8-def.relevantfee-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the proposed plan is lodged after the relevant time and—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ffd0a5b0-941c-4d3d-95bb-3e468bcf5094" id="sec.897-ssec.8-def.relevantfee-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">it is lodged under subsection (5)—nil; or</txt></block></li><li guid="_c8462ac9-c0af-481d-a274-49763e8f2e6e" id="sec.897-ssec.8-def.relevantfee-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">otherwise 20 times the prescribed fee.</txt></block></li></list></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c4b6cf6f-c574-4460-9107-3dae02e0d757" id="sec.898" provision.type="transitional" spent.amends="0"><no>898</no><heading guid="_a3924d44-ee8b-4768-9df1-1b0b6b498331" id="sec.898-he">Consequence of failure to comply with notice to lodge proposed later development plan</heading><subclause affected.by.uncommenced="0" guid="_32f9c29c-50e7-4b7a-b5ad-ede4ae73cbb8" id="sec.898-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If a converted lease holder does not comply with a requirement under section 897(6)(a), the lease is cancelled.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4b07ddc7-4b85-43bc-b4bb-59b1c930c8df" id="sec.898-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the cancellation does not take effect until the holder is given a notice stating that the lease has been cancelled because of the operation of subsection (1).</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1b6bea11-2124-4b9f-948a-bc340379b71b" id="sec.899" provision.type="transitional" spent.amends="0"><no>899</no><heading guid="_51549daa-503b-401f-a645-e0dd9d6e0c87" id="sec.899-he">Existing renewal applications</heading><block><txt break.before="1">If—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d0bede68-6f20-4746-8a8d-9ede14bc41fe" id="sec.899-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">under section 894, a former <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease becomes a converted lease on 31 December 2004; and</txt></block></li><li guid="_1146aa91-1acd-426e-a827-ecc959fcaa24" id="sec.899-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">before 31 December 2004, an application to renew the lease had been made under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>; and</txt></block></li><li guid="_ea0c0da0-ccc6-4ac5-96c2-0aa01adc8a1c" id="sec.899-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">immediately before 31 December 2004 the application had not been granted;</txt></block></li></list></block><block><txt break.before="1">on 31 December 2004, the application is taken to be a renewal application for the converted lease, made under sections 161 and 162.</txt></block></clause><clause affected.by.uncommenced="0" guid="_b7522e4e-b3d7-4606-9814-73446187ec80" id="sec.900" provision.type="transitional" spent.amends="0"><no>900</no><heading guid="_9689fcac-c5a8-4916-8606-95d811c1fce2" id="sec.900-he">Exclusion of s 168(8) for any renewal application</heading><block><txt break.before="1">Section 168(8) does not apply to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f6dfddd8-7545-465c-900f-9388151095ff" id="sec.900-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a renewal application to which section 899 applies; or</txt></block></li><li guid="_485464da-71f7-4f04-ae7b-d1579d264091" id="sec.900-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any subsequent renewal application for the converted lease the subject of that application.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_d989bd1a-3d5e-4829-a551-544860b2b423" id="sec.901" provision.type="transitional" spent.amends="0"><no>901</no><heading guid="_b1422655-4aa5-4150-aba0-f04724640f8b" id="sec.901-he">Lapsing of undecided applications to unite converted leases that relate to a converted lease</heading><block><txt break.before="1">If—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_76a4ed2c-236b-4955-ad91-e9748a4c0ed8" id="sec.901-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">immediately before 31 December 2004, an application had been made under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.100" target.doc.id="act-1923-026" target.guid="_49342461-637b-4c8f-811c-a468683d7c71" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act">section 100</legref>, to unite <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> leases; and</txt></block></li><li guid="_24335c53-7357-454a-8df8-fe0ef350af6b" id="sec.901-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">on 31 December 2004—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_05220745-9d59-42d5-91a7-fc3d95a810ac" id="sec.901-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">any of the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> leases becomes a converted lease; and</txt></block></li><li guid="_8a90f47d-bc3b-4b13-b782-aa1f5ef7dffa" id="sec.901-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the application had not been decided;</txt></block></li></list></block></li></list></block><block><txt break.before="1">the application lapses on 31 December 2004.</txt></block></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_2039a547-8a56-46e4-b293-ce0afe21c5eb" id="ch.15-pt.3-div.5-sdiv.3"><no>Subdivision 3</no><heading guid="_9988b713-a84f-42b7-bf10-6a1c0722385d" id="ch.15-pt.3-div.5-sdiv.3-he">Conversion provision inserted under <legref check="valid" jurisd="QLD" target.doc.id="act-2008-056" target.version.series="5fdd5cba-4218-4882-b3f0-e8ff3ed16ad5" type="act"><name emphasis="no">Mines and Energy Legislation Amendment Act 2008</name></legref> for PL 200</heading><clause affected.by.uncommenced="0" guid="_c5b23b95-1e6c-4bc5-86c4-ae520a40deac" id="sec.901A" provision.type="transitional" spent.amends="0"><no>901A</no><heading guid="_8c637368-b317-4965-bab5-424d51819196" id="sec.901A-he">Application of sdivs 1 and 2</heading><subclause affected.by.uncommenced="0" guid="_72a04980-a9ea-4466-a29c-34f213a8662b" id="sec.901A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease numbered 200.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c274bd97-da90-4796-b333-8a8f07639bfd" id="sec.901A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Subdivisions 1 and 2 apply to the lease as if the reference in the subdivisions to 31 December 2004 were a reference to the day this section commences.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_892f08b8-7397-4c61-bc0d-7a1d07ca6fc7" id="sec.901A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For applying any other provision of this part, the lease is taken to be a converted lease.</txt></block></subclause></clause></subdivision></division><division affected.by.uncommenced="0" guid="_c24add4d-9e31-4bfa-9521-84f11a1580d9" id="ch.15-pt.3-div.6"><no>Division 6</no><heading guid="_68f8755f-992c-40b0-ba43-cc0ad436e030" id="ch.15-pt.3-div.6-he">Provisions for particular <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease applications and <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease renewal applications</heading><subdivision affected.by.uncommenced="0" guid="_939f4c92-6893-4d5d-a47f-126d71a3aae3" id="ch.15-pt.3-div.6-sdiv.1"><no>Subdivision 1</no><heading guid="_2933eb39-df9a-43d3-b698-a0922ce83d2f" id="ch.15-pt.3-div.6-sdiv.1-he">Existing <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.40" target.doc.id="act-1923-026" target.guid="_e3d536bb-8fe2-4e49-962a-29a2955f2ba7" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act">s 40</legref> applications relating to a CSG related <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP or a converted ATP</heading><clause affected.by.uncommenced="0" guid="_a419d366-9eac-4d9f-b50a-a97851fae15f" id="sec.902" provision.type="transitional" spent.amends="0"><no>902</no><heading guid="_4ffcbf99-0954-4c48-b58a-4299cb6317aa" id="sec.902-he">Application of sdiv 1</heading><block><txt break.before="1">This subdivision applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_808b9ef3-ec4a-4abf-a362-2b08c61486b8" id="sec.902-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before 31 December 2004, an application had been made under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.40" target.doc.id="act-1923-026" target.guid="_e3d536bb-8fe2-4e49-962a-29a2955f2ba7" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act">section 40</legref>, by the holder of a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP for a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease; and</txt></block></li><li guid="_7364f824-7adc-4464-8338-70035784a537" id="sec.902-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">immediately before 31 December 2004, the application had not been decided; and</txt></block></li><li guid="_a3119721-79f5-4a1f-b992-4c00e567d712" id="sec.902-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">either—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c0c9b487-eb30-4692-a827-4754559bdb14" id="sec.902-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP is CSG-related; or</txt></block></li><li guid="_2ba7337b-2dbd-4dea-94ef-182eed5d61e3" id="sec.902-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">under section 876, the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP becomes a converted ATP on 31 December 2004.</txt></block></li></list></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_b5a43db5-8f72-46f5-91e6-afdf83b10b92" id="sec.903" provision.type="transitional" spent.amends="0"><no>903</no><heading guid="_c76126d4-a066-48f8-914c-4082f3bd8f6b" id="sec.903-he">Applications for CSG-related <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATPs</heading><subclause affected.by.uncommenced="0" guid="_bc124102-5b92-478b-9646-19d340675334" id="sec.903-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP is CSG-related, the application is taken to be an application under the following division—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c92f066e-7f4a-48ed-8230-d9ec339c8fc0" id="sec.903-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the relevant coal or oil shale mining tenement is a coal or oil shale exploration tenement—whichever of chapter 3, part 2, division 1 or 2 applies;</txt></block></li><li guid="_b80fe80a-7b94-4d07-b28c-11ed36dd1857" id="sec.903-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the relevant coal or oil shale mining tenement is a coal or oil shale mining lease—whichever of chapter 3, part 3, division 2 or 3 applies.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_21b7f1e5-c8b3-4897-9c2c-cf740dc983e1" id="sec.903-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, no step may be taken in relation to the application until the relevant requirements under the division for making an application have been complied with.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4aff1c55-ac7f-4304-8557-4213de0640b7" id="sec.903-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For section 842, the application is taken to be an application under this Act.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_cb3bd289-b36c-4ae0-9f6d-dd3de405281f" id="sec.904" provision.type="transitional" spent.amends="0"><no>904</no><heading guid="_e71d50e6-e33a-473a-815a-a250643b7779" id="sec.904-he">Other applications</heading><subclause affected.by.uncommenced="0" guid="_2c9f8dbc-450c-4739-ab36-a84a082f870c" id="sec.904-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP is not CSG-related, the application is taken to be an ATP-related application.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_18c728be-97b7-4409-8102-d93faec39f9a" id="sec.904-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Chapter 2, part 2, division 2, applies to the application.</txt><note guid="_a64d784c-d730-442a-8c7f-f11a3fca05ef" id="sec.904-ssec.2-note" type="example"><heading guid="_38bad959-5d52-4f05-96d9-e3cbcb5e0a85" id="sec.904-ssec.2-note-he">Note—</heading><block><txt break.before="1">Chapter 3 may also apply for the application. See section 297.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_7ab659fd-b72a-4907-bdb6-aa8a1e3792cf" id="sec.904-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For section 842, the application is taken to be an application under this Act.</txt></block></subclause></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_961a8e2e-2c65-4b05-9f21-8d03239c9bca" id="ch.15-pt.3-div.6-sdiv.2"><no>Subdivision 2</no><heading guid="_94110f6f-c062-44f0-923e-d0fb417eab24" id="ch.15-pt.3-div.6-sdiv.2-he">Petroleum leases provided for under particular agreements before or after 31 December 2004</heading><clause affected.by.uncommenced="0" guid="_ccd9d55c-d390-40ca-93dd-c0064adc52a0" id="sec.905" provision.type="transitional" spent.amends="0"><no>905</no><heading guid="_8e3f1a00-64c9-4816-8fdf-aab58e06bbd3" id="sec.905-he">Application of sdiv 2</heading><block><txt break.before="1">This subdivision applies if, before or after 31 December 2004, an agreement as follows provides for the granting of a proposed petroleum lease under this Act—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_202a1b1b-63f0-40cd-aabd-6b9edcb25cd0" id="sec.905-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an agreement mentioned in the <legref check="invalid" jurisd="CTH" type="act"><name emphasis="no">Commonwealth Native Title Act</name></legref>, <legref check="invalid" jurisd="CTH" refid="sec.31" type="act">section 31</legref><legref check="invalid" jurisd="CTH" refid="sec.31-ssec.1" type="act">(1)</legref><legref check="invalid" jurisd="CTH" refid="sec.31-ssec.1-para1.b" type="act">(b)</legref>;</txt></block></li><li guid="_37e53c74-c5ce-4ddf-947e-bfbb445dbb4a" id="sec.905-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an indigenous land use agreement registered on the register of indigenous land use agreement under the <legref check="invalid" jurisd="CTH" type="act"><name emphasis="no">Commonwealth Native Title Act</name></legref>.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_0c196b38-db96-4fbf-9eca-d43585f9df5e" id="sec.906" provision.type="transitional" spent.amends="0"><no>906</no><heading guid="_2ef3d1e6-5f8a-44a7-ad58-b651ba3fe542" id="sec.906-he">Petroleum lease under this Act may be granted if so provided</heading><subclause affected.by.uncommenced="0" guid="_f12d1e2e-a82f-4fc6-bac2-fb01f416fbc0" id="sec.906-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the agreement provides for the proposed petroleum lease to be granted under this Act, it may be applied for and granted under this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9ba48008-77bf-4cc2-bdd1-84e24cea02e6" id="sec.906-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the agreement provides for the proposed lease to be renewed under this Act, it may be renewed as a petroleum lease under this Act.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1c4a5541-e38b-458e-81e8-18a2521bf20d" id="sec.907" provision.type="transitional" spent.amends="0"><no>907</no><heading guid="_46fbfb98-f517-4099-82b2-e1db3fc2bb9d" id="sec.907-he">Restriction on term of petroleum lease</heading><block><txt break.before="1">The term of the renewed petroleum lease must not be longer than the shorter of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c3198696-5f23-4f0c-b7c2-3569a12a3c62" id="sec.907-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">30 years;</txt></block></li><li guid="_e58a417e-5a09-4a08-9b68-5135e649b684" id="sec.907-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the original term of the petroleum lease;</txt></block></li><li guid="_8f968dd9-bc43-49c0-a9d1-fd20bad6433e" id="sec.907-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">its last renewed term.</txt></block></li></list></block></clause></subdivision></division><division affected.by.uncommenced="0" guid="_3913f342-7570-467c-af70-c12fa03739e0" id="ch.15-pt.3-div.7"><no>Division 7</no><heading guid="_ba067224-4739-4043-bc00-16e738e5e120" id="ch.15-pt.3-div.7-he">Later grant of petroleum tenure to replace equivalent <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> petroleum tenure</heading><subdivision affected.by.uncommenced="0" guid="_20e5fac1-95cd-4c59-986f-4026871a39c0" id="ch.15-pt.3-div.7-sdiv.1"><no>Subdivision 1</no><heading guid="_79fb868e-475f-4542-a4b3-b545b22cd520" id="ch.15-pt.3-div.7-sdiv.1-he">Applying for and obtaining replacement tenure</heading><clause affected.by.uncommenced="0" guid="_7c949fad-03a7-42ef-a1f9-153725110b38" id="sec.908" provision.type="transitional" spent.amends="0"><no>908</no><heading guid="_fccc2df1-3632-4159-87e4-90c190412d9f" id="sec.908-he">Right to apply for petroleum tenure</heading><subclause affected.by.uncommenced="0" guid="_b989650a-a956-4fda-bde1-8d2447b704bf" id="sec.908-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The holder of a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP (the <defterm guid="_fafb3d63-b1e2-4546-a8a7-a329abe61b21" id="sec.908-def.existingtenure" type="definition">existing tenure</defterm>) may apply (the <defterm guid="_71399ccb-1814-4f28-b6c2-25a84116e33a" id="sec.908-def.grantapplication" type="definition">grant application</defterm>) for an authority to prospect (the <defterm guid="_2e20eb1c-9896-40c6-ab68-f67a6b9e6c5b" id="sec.908-def.replacementtenure" type="definition">replacement tenure</defterm>) under this Act for all or part of the area of the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b97d0a8f-7811-4c08-b5af-503838943178" id="sec.908-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The holder of a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease (also the <defterm guid="_df44eaf0-389e-43a3-a3b3-6e150795dbe1" id="sec.908-def.existingtenure-oc.2" type="definition">existing tenure</defterm>) may apply (also the <defterm guid="_d67c2774-eaef-4629-9b36-394ecb594c05" id="sec.908-def.grantapplication-oc.2" type="definition">grant application</defterm>) for a petroleum lease under this Act (also the <defterm guid="_a1920bb2-caea-4798-8b01-974b8f6b708f" id="sec.908-def.replacementtenure-oc.2" type="definition">replacement tenure</defterm>) for all or part of the area of the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_34431d7e-28e2-4e4d-b1e8-e3a1d567c0b5" id="sec.908-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The grant application can not be made before 31 December 2004.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fa0b4753-b38e-4c99-9135-fde74f81f170" id="sec.908-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The grant application may include a request that excluded land for the existing tenure be declared to be excluded land for the replacement tenure.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c07b55ac-2bfe-4d0e-81a6-e7253cbe2a96" id="sec.908-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">The chief executive must record in the register against the replacement tenure all the dealings, caveats and associated agreements recorded in the register against the existing tenure at the time the replacement tenure is registered.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_82e332ce-b755-4151-b3e6-d597786e33d1" id="sec.909" provision.type="transitional" spent.amends="0"><no>909</no><heading guid="_3f2c808b-9842-4a52-970a-aa71797dcb37" id="sec.909-he">Continuing effect of existing tenure for grant application</heading><subclause affected.by.uncommenced="0" guid="_f3260ca8-01ff-47d7-904b-faa3ff574fc0" id="sec.909-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if before the grant application is decided the term of the existing tenure ends.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_883d4b64-fd71-4997-9ef9-7d17f8402f53" id="sec.909-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite the ending of the term, the existing tenure continues in force until the earlier of the following to happen—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bdfe3f28-bd65-4f49-b469-432275194a35" id="sec.909-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the replacement tenure is granted;</txt></block></li><li guid="_43c7800b-b77d-4594-8eff-459604fe859a" id="sec.909-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the application is rejected;</txt></block></li><li guid="_d39d29bf-2499-430f-a990-604e8f1ee1d5" id="sec.909-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the application is withdrawn;</txt></block></li><li guid="_c313e66e-e6d0-4598-83ac-da3191e4060c" id="sec.909-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the existing tenure is cancelled under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_636f0f94-4ac2-454d-bacc-c0867d9bb387" id="sec.910" provision.type="transitional" spent.amends="0"><no>910</no><heading guid="_7a359225-c076-4b22-9800-76c548f19b98" id="sec.910-he">Renewal application provisions apply for making and deciding grant application</heading><subclause affected.by.uncommenced="0" guid="_86f62115-3633-4fc7-851a-84cba19a291d" id="sec.910-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Subject to subdivision 2, the following provisions apply to the making and deciding of the grant application and to the replacement tenure—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_06a177aa-d9b2-4b0e-a079-86fc828548cb" id="sec.910-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the existing tenure is a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_96d93a02-72b0-4d2c-9257-967b8e5e1728" id="sec.910-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">chapter 2, part 1, division 5, other than sections 81(2), 82(1)(a) and (i) and 83; and</txt></block></li><li guid="_f27fdf8c-5b53-4380-a42b-6acd5b54e8d3" id="sec.910-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">sections 99 and 100;</txt></block></li></list></block></li><li guid="_b6b0d265-b7a6-4237-8f2c-555d2e794c44" id="sec.910-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the existing tenure is a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6741fe58-822d-447d-8f83-26ab5619726e" id="sec.910-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">chapter 2, part 2, division 6, other than sections 161(2) and (3), 162(1)(a) and (f), 163 and 165(4);</txt></block></li><li guid="_8d518ada-0526-4bbe-ac3f-63b3675c699b" id="sec.910-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">sections 169 and 170.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ef5f13b9-9acc-495c-a307-d56de4ef9ea1" id="sec.910-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The provisions applied under subsection (1) apply as if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_78d97d67-7e74-4023-bfc7-6f96a861b2b8" id="sec.910-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the grant application were an application to renew the type of petroleum tenure that corresponds to the existing tenure; and</txt></block></li><li guid="_a171887a-902d-4d27-97e3-be3ed71b3b5e" id="sec.910-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">in chapter 2, part 1, division 5, a reference to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_01a38245-5ba2-4fc7-b83b-d25587d0b7dc" id="sec.910-ssec.2-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the authority to prospect were a reference to the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP; and</txt></block></li><li guid="_50fbc048-01d0-4ce0-8b2a-5d36baaacf32" id="sec.910-ssec.2-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the authority to prospect holder were a reference to the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP holder; and</txt></block></li><li guid="_f6ded3c4-6de0-423f-8ade-378ead62341b" id="sec.910-ssec.2-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">a work program for the authority to prospect were a reference to the work program for the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP; and</txt></block></li><li guid="_f36f4118-0339-4ea0-b412-2b5210575eab" id="sec.910-ssec.2-para1.b-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">the renewed authority to prospect were a reference to the replacement tenure; and</txt></block></li></list></block></li><li guid="_74bb67ec-deb3-4972-b63d-0664ee284f29" id="sec.910-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">in chapter 2, part 2, division 6, a reference to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4a2938ab-7660-4120-8f1c-e1ef543b341d" id="sec.910-ssec.2-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the petroleum lease were a reference to the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease; and</txt></block></li><li guid="_ae2114a6-ce3b-4633-bb67-0f0b55258b56" id="sec.910-ssec.2-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the petroleum lease holder were a reference to the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease holder; and</txt></block></li><li guid="_e0303c1d-edf7-4662-9d55-798dd97e4b9c" id="sec.910-ssec.2-para1.c-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">a development plan for the petroleum lease were a reference to the development plan under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> for the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease; and</txt></block></li><li guid="_f6019481-39ac-4fcc-a020-4275a9ad2c1c" id="sec.910-ssec.2-para1.c-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">the renewed petroleum lease were a reference to the replacement tenure; and</txt></block></li></list></block></li><li guid="_0515dd0f-b4ff-4c56-aa26-10342f01eb71" id="sec.910-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a reference to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_767ffd59-997a-437c-b293-5f60f612d114" id="sec.910-ssec.2-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the civil penalty were a reference to the civil penalty under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>; and</txt></block></li><li guid="_457a6b71-b9bf-4259-9122-9ff4818b7b32" id="sec.910-ssec.2-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">interest were a reference to interest under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_0ebb8600-e860-4c45-814f-73a60b7cc378" id="sec.910-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Sections 98 and 168 do not apply to the replacement tenure.</txt><note guid="_8be04dc2-2ae6-4549-9f7a-04bb9395ff8a" id="sec.910-ssec.3-note" type="example"><heading guid="_61f80f43-864f-4ce6-aa69-2689095bf741" id="sec.910-ssec.3-note-he">Note—</heading><block><txt break.before="1">Chapters 3 and 3A may also apply for the grant application. See sections 297 and 392AA.</txt></block></note></block></subclause></clause><clause affected.by.uncommenced="0" guid="_742f9d2b-8d09-4453-9308-4e0f082297ba" id="sec.911" provision.type="transitional" spent.amends="0"><no>911</no><heading guid="_61257028-413a-46b8-b912-0ffdc926d144" id="sec.911-he">Effect of replacement tenure on existing tenure</heading><subclause affected.by.uncommenced="0" guid="_8d01d751-db0d-4e04-a5f1-4ece6987a26b" id="sec.911-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the replacement tenure takes effect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_434509a6-c601-4732-a822-833dd51b75e4" id="sec.911-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the area the subject of the grant application is all the land in the area of the existing tenure, the existing tenure ends.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3470a111-117a-4c80-816e-cdb90c407518" id="sec.911-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the area the subject of the grant application is only part of the land in the area of the existing tenure—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cd71a8c3-138a-4fc9-8add-c36a088ae106" id="sec.911-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the part ceases to be in the area of the existing tenure; and</txt></block></li><li guid="_ac5d5d06-c542-45e4-880e-afa094a09ccf" id="sec.911-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">land that, at any time, is declared to be excluded land for the replacement tenure ceases to be excluded land for the existing tenure.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_754dbd44-9a76-4d22-9961-689a900bafba" id="sec.911A" provision.type="transitional" spent.amends="0"><no>911A</no><heading guid="_57ba0f78-81ab-4945-832c-e93466defa10" id="sec.911A-he">Provision for continuance of <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> make good obligation</heading><block><txt break.before="1">The make good obligation for the replacement tenure applies as if a reference in this Act to the exercise of underground water rights for the replacement tenure included a reference to the taking of water necessarily taken as part of petroleum production under the existing tenure.</txt></block></clause></subdivision><subdivision affected.by.uncommenced="0" guid="_00948a80-c447-4a52-a4fd-d91093cc277a" id="ch.15-pt.3-div.7-sdiv.2"><no>Subdivision 2</no><heading guid="_6b874f43-8fd4-41b6-b2ba-f923dca60f56" id="ch.15-pt.3-div.7-sdiv.2-he">Special provisions for the replacement tenure</heading><clause affected.by.uncommenced="0" guid="_cbcee223-84b4-4f20-a3dd-32c2b9af44fa" id="sec.912" provision.type="transitional" spent.amends="0"><no>912</no><heading guid="_2a74736b-442d-4816-9927-ed3763c8e90d" id="sec.912-he">Restrictions on term and renewed terms</heading><subclause affected.by.uncommenced="0" guid="_e6e72acd-f7f7-4d1e-93e3-76c8d3f9c8fb" id="sec.912-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If the replacement tenure is an authority to prospect the term of any renewal of the tenure must not end more than 12 years from the end of its current term.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e297d039-e97f-4f79-9050-b8a9fec54986" id="sec.912-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The <defterm guid="_303059f2-4ac5-48cb-a739-b5825d2225ff" id="sec.912-def.currentterm" type="definition">current term</defterm> of an authority to prospect is the period that starts on the later of the following days and ends when it is first renewed after 31 December 2004—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6dece0e5-f3b0-41a3-bf15-f88b049c14fa" id="sec.912-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the day the relevant <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP was granted;</txt></block></li><li guid="_c931d3bf-4894-4b97-ac89-adc4eeab6c78" id="sec.912-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the day that the last renewal of the relevant <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP before 31 December 2004 became effective.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2f7c0c53-a7b2-4675-a6cd-368ed71121ae" id="sec.912-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, a relevant <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP granted between 1 January 1994 and 23 December 1996 ends on a day decided by the Minister.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4705401c-3125-4dc5-aff5-fb97598cbd41" id="sec.912-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">For subsection (2)(b), a renewal of the authority is taken to have become effective on the day immediately after the end of its last term before the renewal.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_27b3c342-e700-44ea-b8bb-52200ae50d71" id="sec.912-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the replacement tenure is a petroleum lease, the term of the tenure ends on the earlier of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_25141a1f-93c3-43c6-800c-9f7b104b7c2b" id="sec.912-ssec.5-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">30 years after the grant of the replacement lease;</txt></block></li><li guid="_07d0d4b4-852f-4c3a-8abd-4dc671c7abbb" id="sec.912-ssec.5-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a day decided by the Minister.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_78a81307-6fc7-4fe6-b024-82a25308e105" id="sec.913" provision.type="transitional" spent.amends="0"><no>913</no><heading guid="_1252be8e-da0c-4525-be5b-358787991b9e" id="sec.913-he">Relinquishment condition for replacement authority to prospect</heading><block><txt break.before="1">If the replacement tenure is an authority to prospect (the <defterm guid="_be448dae-161e-4455-a553-bb6964fa8bd8" id="def.replacementauthority" type="definition">replacement authority</defterm>), section 878 or 879 applies as if a reference in the section to a converted ATP were a reference to the replacement authority.</txt></block></clause></subdivision></division><division affected.by.uncommenced="0" guid="_e5a29070-4fd1-4258-a818-1be10035a90c" id="ch.15-pt.3-div.8"><no>Division 8</no><heading guid="_4911ddf4-060b-438c-b4e5-406383ef6cc3" id="ch.15-pt.3-div.8-he">Matters relating to licence equivalents before 31 December 2004</heading><clause affected.by.uncommenced="0" guid="_11ddc268-dc27-4e2f-a76e-1b813e774f60" id="sec.914" provision.type="transitional" spent.amends="0"><no>914</no><heading guid="_1c6447e2-8671-41e2-9302-e6c0bf04373d" id="sec.914-he">Requests for entry permission</heading><block><txt break.before="1">If, before 31 December 2004, the Minister was asked to grant an entry permission under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> for land, the Minister may treat the request as a survey licence application made under chapter 4, part 1 for the land.</txt></block></clause><clause affected.by.uncommenced="0" guid="_aca38bf6-a60e-4c9e-91a6-bfff411bace1" id="sec.915" provision.type="transitional" spent.amends="0"><no>915</no><heading guid="_ce7957fe-066a-49fa-95f9-40a1d7978f39" id="sec.915-he">Entry permissions</heading><subclause affected.by.uncommenced="0" guid="_f8c628d9-1310-4440-8512-76a72aedeafe" id="sec.915-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if an entry permission under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> former section 67 is in force immediately before 31 December 2004 for land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4e55613f-4d63-4b9d-ad41-11ede8d16890" id="sec.915-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On 31 December 2004—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5636cb35-3241-44c4-a149-157c3f71cd14" id="sec.915-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the permission is a survey licence under this Act for the land; and</txt></block></li><li guid="_f54985a5-4da8-499a-ab39-b565a25db5ad" id="sec.915-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder of the permission is the holder of the licence.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c2ea08d8-13f6-464f-a41b-42927ff7e464" id="sec.915-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The licence continues, subject to this Act, for the shorter of the following periods to end—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f6f1d0fa-a51a-4939-ad30-644e0c5061e5" id="sec.915-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the balance of the permission’s term;</txt></block></li><li guid="_4cf1038c-e74e-4bdb-9da4-e3885ebd470b" id="sec.915-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the period that ends 1 year after 31 December 2004.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f24af7ea-9d3b-470d-9e5c-e68e84bd1b8b" id="sec.915-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The licence is held subject to this Act and the conditions of the permission.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_70f7fcb5-b71f-4e1d-8490-98d18ad6e378" id="sec.915-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">However, if a condition of the permission conflicts with a mandatory condition for survey licences or any relevant environmental condition for the licence, the mandatory condition or relevant environmental condition prevails to the extent of the inconsistency.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_54924358-7e57-499c-befc-fdf4a7db54dd" id="sec.916" provision.type="transitional" spent.amends="0"><no>916</no><heading guid="_cb7e9900-4f30-46ec-9559-7e6bd46d76cf" id="sec.916-he">Pipeline licences</heading><subclause affected.by.uncommenced="0" guid="_721b6b11-5f15-4c22-a6b1-b49d7eb8c453" id="sec.916-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a pipeline licence (the <defterm guid="_3ee38c26-57cf-48a3-b7aa-71b688addb6a" id="sec.916-def.oldlicence" type="definition">old licence</defterm>) under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> is in force immediately before 31 December 2004 for land.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9d1ad2a0-e80e-4d94-b4c2-80605d051e17" id="sec.916-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On 31 December 2004—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_285fb2b9-9230-4fd8-a70e-b9a7797bc7ef" id="sec.916-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the old licence is a pipeline licence under this Act for the land (a <defterm guid="_80ee49d2-36b5-42d8-a403-a1fc9bc6dc00" id="sec.916-ssec.2-def.convertedlicence" type="definition">converted licence</defterm>); and</txt></block></li><li guid="_86f5e4b3-7eb4-4585-bb64-e974c8ffdb23" id="sec.916-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder of the old licence is the holder of the converted licence; and</txt></block></li><li guid="_3e3f2f8f-d34a-4d6e-b7a2-5bcadc1031cc" id="sec.916-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the old licence had a term, the converted licence is for the balance of the old licence’s term; and</txt></block></li><li guid="_217f986e-e0ee-4aa0-8d95-b452d21f9a3a" id="sec.916-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">the converted licence is held subject to this Act and the conditions of the old licence, other than any condition that is the same, or substantially the same, as any relevant environmental condition for the converted licence.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_4091c516-d9b7-4e68-b9d2-ce334b819b9f" id="sec.916-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, if a condition of the old licence conflicts with any of the following (the <defterm guid="_cab776c7-3e7d-458e-a58b-926817ab8525" id="sec.916-def.overrulingprovision" type="definition">overruling provision</defterm>) the overruling provision prevails to the extent of the inconsistency—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_711c3dd6-aec9-451a-8883-8433b03066d3" id="sec.916-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a provision of this Act;</txt></block></li><li guid="_ff511586-3617-4bf6-8af1-ff717a5b7bc6" id="sec.916-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a mandatory condition for pipeline licences under this Act;</txt></block></li><li guid="_74dcbee4-bab6-434c-9387-50fa4571319a" id="sec.916-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a relevant environmental condition for the converted licence.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b50c6798-56da-4af3-b303-5a276a888190" id="sec.917" provision.type="transitional" spent.amends="0"><no>917</no><heading guid="_638e439e-a026-4cc4-b408-fa615e46a75f" id="sec.917-he">Requests for pipeline licence</heading><block><txt break.before="1">If, before 31 December 2004, the Minister was asked to grant a pipeline licence under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> for land, the Minister may treat the request as a pipeline licence application made under chapter 4, part 2 for the land.</txt></block></clause><clause affected.by.uncommenced="0" guid="_f85543b6-b6b3-4548-ada7-80386429905e" id="sec.918" provision.type="transitional" spent.amends="0"><no>918</no><heading guid="_27430c5b-f308-498d-a0ba-5970d1ff2e1b" id="sec.918-he">Approvals under <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.75" target.doc.id="act-1923-026" target.guid="_da8977f2-8266-46fc-86d5-871e56f2bca3" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act">s 75</legref><legref check="invalid" jurisd="QLD" refid="sec.75-ssec.5" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act">(5)</legref> continue in force</heading><block><txt break.before="1">An approval under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>, former section 75(5), that is in force immediately before 31 December 2004 for land, despite the repeal of former section 75, continues in force for the land.</txt></block></clause><clause affected.by.uncommenced="0" guid="_6cd601f4-1b20-444e-82b1-97581cf03159" id="sec.919" provision.type="transitional" spent.amends="0"><no>919</no><heading guid="_b32bdf75-63a2-4bbf-a4c7-af170e3891c4" id="sec.919-he">Refinery permissions</heading><subclause affected.by.uncommenced="0" guid="_c4edeaf4-8e89-41dc-abfc-48de8032193d" id="sec.919-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a refinery permission under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>, former section 66, is in force immediately before 31 December 2004.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9833d72f-8ca3-4921-8151-c87f3e7dd450" id="sec.919-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If, immediately before 31 December 2004, the refinery had been constructed and was in operation, on 31 December 2004—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_49f44465-55bf-4110-b270-d1e62961929b" id="sec.919-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the permission is a petroleum facility licence; and</txt></block></li><li guid="_04f1f64c-b6d6-47b1-b48d-7bfa603d2d34" id="sec.919-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder of the permission is the holder of the licence; and</txt></block></li><li guid="_ef990be4-01fd-4c88-b844-6dd87d666ee2" id="sec.919-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if the permission had a term—the term of the licence is the balance of the permission’s term; and</txt></block></li><li guid="_4f4237a4-cccc-49d3-a389-6577170dbc69" id="sec.919-ssec.2-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">if the permission did not have a term—the term of the licence ends 30 years after 31 December 2004; and</txt></block></li><li guid="_0cd6a976-014a-4a3d-bd59-94fdc2c60db4" id="sec.919-ssec.2-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">the licence is held subject to this Act and the conditions of the permission, other than any condition that is the same, or substantially the same, as any relevant environmental condition for the licence; and</txt></block></li><li guid="_f2e879b1-87eb-4216-ab67-da60ce79cc47" id="sec.919-ssec.2-para1.f" provision.type="other"><no>(f)</no><block><txt break.before="0">until an annual fee is prescribed for the licence, the annual fee for the licence is the annual fee payable for the permission.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_fcdf79ac-7bb8-42f0-91ce-8de223615f18" id="sec.919-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, if a condition of the permission conflicts with any of the following (the <defterm guid="_8f1f76a8-2bad-4ae1-89cf-d6ba1e3e6d35" id="sec.919-def.overrulingprovision" type="definition">overruling provision</defterm>) the overruling provision prevails to the extent of the inconsistency—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_358a99dd-adc8-435b-9248-e457786fb18b" id="sec.919-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a provision of this Act;</txt></block></li><li guid="_c147be29-7467-4924-8e7a-50734c44a3df" id="sec.919-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a mandatory condition for petroleum facility licences;</txt></block></li><li guid="_fa12a29f-7cdc-43a8-9030-4c6f38576173" id="sec.919-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a relevant environmental condition for the petroleum facility licence.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ec259efc-6000-45ed-93b6-e0429a49bc85" id="sec.919-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">If the refinery had not been constructed or was not in operation immediately before 31 December 2004, the permission lapses.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_59c49d07-4911-4adc-b9e2-66bb1c4d2b09" id="ch.15-pt.3-div.9"><no>Division 9</no><heading guid="_6d2543fd-7eb3-4dd9-bbd9-5fe2a6a3925d" id="ch.15-pt.3-div.9-he">Securities</heading><clause affected.by.uncommenced="0" guid="_1f2787a4-386b-4a30-af3e-475bb54efeb1" id="sec.920" provision.type="transitional" spent.amends="0"><no>920</no><heading guid="_098308b9-95ea-4617-856d-824a3bfb6c31" id="sec.920-he">Monetary securities</heading><subclause affected.by.uncommenced="0" guid="_ad57f146-2a98-4b94-a630-728fa3458e79" id="sec.920-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to security (the <defterm guid="_ad267c44-f0f2-412f-9e63-17e9aea273c5" id="sec.920-def.existingsecurity" type="definition">existing security</defterm>) held as money in relation to a converted petroleum authority immediately before 31 December 2004.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_bb815571-b682-461c-b5bb-e365baa85c4d" id="sec.920-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The department must, as soon as practicable, after 31 December 2004, transfer the following part of the existing security (the <defterm guid="_3d1e4aa8-57a5-4858-9847-f3488443bf7e" id="sec.920-def.environmentalcomponent" type="definition">environmental component</defterm>) to the administering authority under the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act"><name emphasis="no">Environmental Protection Act</name></legref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_018f3802-cbd9-4f2e-8408-0d346f7f1149" id="sec.920-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the converted petroleum authority is an authority to prospect—the amount of the existing security, less $4,000;</txt></block></li><li guid="_2d20a9c5-1020-4f0d-9b36-4397ddc35cb5" id="sec.920-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the converted petroleum authority is a petroleum lease—the amount of the existing security, less $10,000.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_43101938-51dd-4bda-bc8b-0de68a80d5d7" id="sec.920-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">On the transfer, the rest of the existing security is taken to be security given under this Act for the converted petroleum authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_63e4fc8e-7dac-4cac-af16-bbdd41320418" id="sec.920-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Until the transfer happens, the existing security may continue to be used for any purpose for which it was given.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_98f4be5e-dbf6-40df-a1dc-71f13c8ef01e" id="sec.920-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_0d464d34-ae1b-4dc7-9e9d-c48883f2f34f" id="sec.920-ssec.5-def.used_"><txt break.before="1"><defterm guid="_70d63a5c-ec3c-4093-9eec-60b18caf3e65" id="sec.920-ssec.5-def.used" type="definition">used</defterm> includes realised, in whole or part.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_82035be1-3560-4463-8b26-a3a19a552163" id="sec.921" provision.type="transitional" spent.amends="0"><no>921</no><heading guid="_ad806857-ad9c-4824-9371-305b40a581bb" id="sec.921-he">Non-monetary securities</heading><subclause affected.by.uncommenced="0" guid="_372914be-ccbc-4ae1-8c90-5da35fbc1f73" id="sec.921-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to security held, other than as money, in relation to a converted petroleum authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_eb5aa971-588d-4e63-ad76-3e3ed71a4001" id="sec.921-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">From 31 December 2004, the security may continue to be used for any purpose for which it was given.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f3ffb3e7-ff01-4a3d-9a2c-6d3b85291c75" id="sec.921-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, subsection (2) does not—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_50007431-64c8-4fdc-8094-15e3af7ebdcd" id="sec.921-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">prevent the security being used after 31 December 2004 in relation to an act done or omission made before 31 December 2004 if it could have been used in relation to the act or omission immediately before 31 December 2004; or</txt></block></li><li guid="_3c19705f-943b-4233-8b7f-e56613f89431" id="sec.921-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">affect the power under this Act to require replacement security or additional security for the converted petroleum authority; or</txt></block></li><li guid="_92f3fffa-55b9-4f8c-b031-662f89ad70d1" id="sec.921-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">affect any power under the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act"><name emphasis="no">Environmental Protection Act</name></legref> to require financial assurance for any relevant environmental authority for the converted petroleum authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_24f7ff06-bb73-4909-93ab-0185797adee6" id="sec.921-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_20e7d703-80aa-4daf-b8cd-3eb363d45356" id="sec.921-ssec.4-def.used_"><txt break.before="1"><defterm guid="_5f6fdb20-bcd1-494d-85a8-7682874ca7ed" id="sec.921-ssec.4-def.used" type="definition">used</defterm> includes realised, in whole or part.</txt></definition></deflist></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_e90f1013-60e1-4eb4-9cbb-d4f2ef7e6a05" id="ch.15-pt.3-div.10"><no>Division 10</no><heading guid="_9a2af17e-a556-4b09-9a10-c68e4bf6440b" id="ch.15-pt.3-div.10-he">Compensation</heading><clause affected.by.uncommenced="0" guid="_a6e04e1b-9902-4074-89f7-7d80eec7f709" id="sec.922" provision.type="transitional" spent.amends="0"><no>922</no><heading guid="_f4cbbb29-0942-4a00-827f-0d414e806e05" id="sec.922-he">Accrued compensation rights relating to converted petroleum authority</heading><subclause affected.by.uncommenced="0" guid="_92de6f40-d5cc-45f6-afda-1aa3391c2e79" id="sec.922-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_73ecb744-ba92-4f18-8c4f-54c1fc1f21b7" id="sec.922-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a right, under the former <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> compensation provisions, to compensation existed immediately before 31 December 2004; and</txt></block></li><li guid="_7324b137-1187-4040-84ae-264104d71afb" id="sec.922-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the right relates to a converted petroleum authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9e0b63ec-96e2-4b2f-ab71-95594f32a8da" id="sec.922-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The right continues after 31 December 2004.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_55d8d601-9aa2-472a-b2c0-5b0f4f3575fd" id="sec.922-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The compensation must be decided under the former <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> compensation provisions as if the provisions had not been repealed.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_548c90e3-16b2-4fba-83e1-797f1f736533" id="sec.922-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">A matter relating to the compensation that, before 31 December 2004, had been referred to the Land and Resources Tribunal but not decided must be decided under the former <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> compensation provisions.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6658a0b3-d022-4b21-aee0-6443811a46d9" id="sec.922-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_c6e322a4-fecf-4f22-b35e-8689cd5e269f" id="sec.922-ssec.5-def.former1923Actcompensationprovisions_"><txt break.before="1"><defterm guid="_233e0064-2755-4935-a546-3b05acffba73" id="sec.922-ssec.5-def.former1923Actcompensationprovisions" type="definition">former 1923 Act compensation provisions</defterm> means <legref check="valid" jurisd="QLD" refid="sec.18" target.doc.id="act-1923-026" target.guid="_c9d2f6f6-2d48-4cd8-866c-a4c9266660a1" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act">sections 18</legref><legref check="invalid" jurisd="QLD" type="act">(5)</legref> and <legref check="valid" jurisd="QLD" refid="sec.97" target.doc.id="act-1923-026" target.guid="_8b2a4535-7447-4cc0-b810-65a82a60b5b7" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act">97</legref> to <legref check="valid" jurisd="QLD" refid="sec.99" target.doc.id="act-1923-026" target.guid="_b8e58931-c385-4f17-9ead-673f924b513f" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act">99</legref> of the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>, as they were in force immediately before 31 December 2004.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_58398bce-e558-4308-a443-cf7420e64ede" id="sec.923" provision.type="transitional" spent.amends="0"><no>923</no><heading guid="_1b75ab30-0611-4dfd-9714-cb74e3ddd750" id="sec.923-he">Existing compensation agreements relating to converted petroleum authority</heading><subclause affected.by.uncommenced="0" guid="_5aff03a8-165d-40ff-b7ca-d87d8bb249ac" id="sec.923-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to an agreement mentioned in <legref check="valid" jurisd="QLD" refid="sec.98" target.doc.id="act-1923-026" target.guid="_f3371a12-0f50-409d-ae89-f2ec1ef3bca2" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act">section 98</legref><legref check="invalid" jurisd="QLD" refid="sec.98-ssec.1" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act">(1)</legref> of the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>, as it was in force immediately before 31 December 2004, for compensation relating to a converted petroleum authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_49e5f6c0-705a-4236-82ef-6985656fc975" id="sec.923-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On 31 December 2004, the agreement is taken to be a compensation agreement made under this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7ee858cc-d712-4523-92d1-f14f04bcf1fa" id="sec.923-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The agreement may be enforced as if the agreement were a compensation agreement under chapter 5, part 5.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e63c7efc-c174-42f0-baff-511ffa835386" id="sec.923-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">However, the agreement can not be the subject of an application under section 534.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_56e4ebb6-805d-401f-b7de-f51549c26346" id="sec.923-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Subsection (3) applies even if the agreement was not valid because <legref check="valid" jurisd="QLD" refid="sec.98" target.doc.id="act-1923-026" target.guid="_f3371a12-0f50-409d-ae89-f2ec1ef3bca2" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act">section 98</legref><legref check="invalid" jurisd="QLD" refid="sec.98-ssec.2" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act">(2)</legref> of the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>, as it was in force immediately before 31 December 2004, had not been complied with.</txt></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_36eccb84-7568-476c-bdf9-1c38009d3855" id="ch.15-pt.3-div.11"><no>Division 11</no><heading guid="_619f5c9a-b9a3-49c2-90a2-624021c8c7d0" id="ch.15-pt.3-div.11-he">Miscellaneous provisions</heading><clause affected.by.uncommenced="0" guid="_da413fac-8f11-4c2e-aa28-14c7a8d15294" id="sec.924" provision.type="transitional" spent.amends="0"><no>924</no><heading guid="_09db113d-7b48-48ea-b8f2-8fdb792f727f" id="sec.924-he">Conversion of unitisation arrangement or unit development agreement to coordination arrangement</heading><subclause affected.by.uncommenced="0" guid="_e3d13c5f-db19-44b8-ac3f-7ea8b04e0b6e" id="sec.924-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to a unit development agreement approved under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.102" target.doc.id="act-1923-026" target.guid="_d1d426e3-a815-40f4-b824-2bbac89d006c" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act">section 102</legref><legref check="invalid" jurisd="QLD" type="act">(2)</legref> or unitisation arrangement under that Act, if the agreement or arrangement was in force immediately before 31 December 2004.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_cdcbd9bc-5cc0-41dc-aa97-d73c38a424d9" id="sec.924-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On 31 December 2004, the agreement or arrangement is taken to be a coordination arrangement approved under section 236.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c6e8b1de-5882-4813-935e-a583adee95aa" id="sec.924-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The parties to the agreement or arrangement are the parties to the coordination arrangement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8094e19d-6ba0-4406-b7b7-3ebcacddbed6" id="sec.924-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">For the <legref check="invalid" jurisd="CTH" type="act"><name emphasis="yes">Trade Practices Act 1974</name> (Cwlth)</legref>, the approval and authority under <legref check="invalid" jurisd="CTH" refid="sec.63" type="act">section 63</legref><legref check="invalid" jurisd="CTH" refid="sec.63-ssec.5" type="act">(5)</legref> of that Act, as in force immediately before 31 December 2004, continues for the unitisation arrangement.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_4fc4c2b3-732b-4f7a-9c8c-09052ac2f875" id="sec.925" provision.type="transitional" spent.amends="0"><no>925</no><heading guid="_3976a52b-1854-4237-9de5-63ab0475d2ff" id="sec.925-he">Entry notices under <legref check="valid" jurisd="QLD" target.doc.id="sl-1966-pr" target.version.series="cd0f4742-89cd-4d79-a5ec-de3b393fcd36" type="subordleg"><name emphasis="no">Petroleum Regulation 1966</name></legref>, <legref check="invalid" jurisd="QLD" refid="sec.17" target.doc.id="sl-1966-pr" target.version.series="cd0f4742-89cd-4d79-a5ec-de3b393fcd36" type="subordleg">s 17</legref></heading><subclause affected.by.uncommenced="0" guid="_5eb49f0e-8f51-48d1-8510-69f298cc74ca" id="sec.925-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a notice of entry under the <legref check="valid" jurisd="QLD" target.doc.id="sl-1966-pr" target.version.series="cd0f4742-89cd-4d79-a5ec-de3b393fcd36" type="subordleg"><name emphasis="yes">Petroleum Regulation 1966</name></legref>, <legref check="invalid" jurisd="QLD" refid="sec.17" target.doc.id="sl-1966-pr" target.version.series="cd0f4742-89cd-4d79-a5ec-de3b393fcd36" type="subordleg">section 17</legref> is in force immediately before 31 December 2004 and the notice relates to a converted petroleum tenure or a replacement tenure.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e69edb3c-2a51-4542-89e8-ab193a44e568" id="sec.925-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On 31 December 2004—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6f7becb4-0029-4fec-a41a-e0f89c0135bb" id="sec.925-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the notice of entry is taken to be an entry notice; and</txt></block></li><li guid="_367ace1c-c2aa-4854-be26-f5db5341fb5b" id="sec.925-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the entry notice is taken to have been given under chapter 5, part 2; and</txt></block></li><li guid="_865fecff-5e5e-4f3f-88be-294458829751" id="sec.925-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the entry period for the entry notice is the shorter of the following periods to end—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7632af0d-52d1-4771-8c78-2076460a7dab" id="sec.925-ssec.2-para1.c-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the balance of the period of the notice of entry;</txt></block></li><li guid="_282d4f50-0c3a-42e9-9008-c3b0de0ff9fa" id="sec.925-ssec.2-para1.c-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the period that ends 6 months after 31 December 2004.</txt></block></li></list></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_83002ab6-3aa4-48b3-9507-e7825995ab89" id="sec.926" provision.type="transitional" spent.amends="0"><no>926</no><heading guid="_f349ade8-03ac-49b5-bca7-f7587fb54083" id="sec.926-he">Provisions for petroleum royalty</heading><subclause affected.by.uncommenced="0" guid="_d5b27fa7-1a66-4d6b-81f7-3c81c79286dd" id="sec.926-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If immediately before 31 December 2004—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3944cd8e-f8a1-4c93-ba78-485f831b81d6" id="sec.926-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">royalty was payable under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> for petroleum produced before 31 December 2004; and</txt></block></li><li guid="_c05ba6e6-4c02-4d52-985f-6d1c690e8704" id="sec.926-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the royalty had not been paid;</txt></block></li></list></block><block><txt break.before="1">from 31 December 2004, the royalty may be recovered from the petroleum producer as petroleum royalty payable under this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d61be787-ab56-49c0-8f88-2e1ab75af59d" id="sec.926-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Chapter 6 applies to petroleum produced before 31 December 2004 if liability under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> for actual payment of the royalty had not arisen before that day.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6640c63c-8fd5-45a0-b1b8-685db1ab57a2" id="sec.926-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Despite subsections (1) and (2), petroleum royalty is not payable under this Act for petroleum flared or vented under an approval given under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> before 31 December 2004.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_6208e3c5-6687-4cb0-9bc3-2f5888468458" id="sec.927" provision.type="transitional" spent.amends="0"><no>927</no><heading guid="_7dbc7c48-e461-4c86-85a2-95f2d6df33be" id="sec.927-he">Corresponding approvals and decisions under <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> for a converted petroleum authority</heading><subclause affected.by.uncommenced="0" guid="_ccda30a8-e10b-42ed-b190-ecfaa9978d90" id="sec.927-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to an approval or decision—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_835d0613-b107-4a1c-9712-e9b0eadf5a35" id="sec.927-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">about any of the following under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_04f5b2f8-0567-479a-b1c5-fdd89037f4ae" id="sec.927-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">an authority to prospect;</txt></block></li><li guid="_b76842b7-37df-434f-ae96-89a4e3fa1b40" id="sec.927-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a petroleum lease;</txt></block></li><li guid="_245ede07-798d-4c47-affb-4106e15ac5c5" id="sec.927-ssec.1-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">a pipeline licence;</txt></block></li><li guid="_d91b1ec9-687b-4359-99a2-c9dabbbb8849" id="sec.927-ssec.1-para1.a-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">a refinery permission; and</txt></block></li></list></block></li><li guid="_1b33f14a-17d5-425d-94f7-46b2d0068b9c" id="sec.927-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">made under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> about a matter provided for under this Act; and</txt></block></li><li guid="_76c071e6-2b0f-46a3-89b9-0038d329b81e" id="sec.927-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">that continues to have effect immediately before 31 December 2004.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7ba7c070-9849-4b32-9143-891193193c5c" id="sec.927-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On 31 December 2004, the approval or decision is taken to be an approval or decision made for the corresponding matter under this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_dacfe2e0-86cf-4abf-b277-796b1413783c" id="sec.927-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Subsection (2) applies subject to any other provision of this part.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d37611f9-74af-4026-978a-bed101a3c75c" id="sec.927-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">For subsection (2), an approval under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>, former section 56(1)(c) is also taken to be—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d755d55c-1f14-4a6b-bdde-6923066b9cec" id="sec.927-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for a converted ATP—an approval under section 73; or</txt></block></li><li guid="_9279a224-29e4-40a0-9d00-0b4ae2de3afc" id="sec.927-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for a converted lease—an approval under 152.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e9462756-8700-4920-aec1-0465a18029f3" id="sec.928" provision.type="transitional" spent.amends="0"><no>928</no><heading guid="_63b3dfef-9e8b-44f7-bc8b-14b70eb1ef9a" id="sec.928-he">Existing dealing applications</heading><subclause affected.by.uncommenced="0" guid="_67e815ef-8a3e-47ff-9c3b-957cbee911ed" id="sec.928-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, before 31 December 2004—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_41a38403-f865-47dd-83f3-7d625eeeb89a" id="sec.928-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an application was made under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> for approval of, or consent to, a dealing relating to a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> petroleum tenure or a licence under that Act that a converted petroleum authority replaced; and</txt></block></li><li guid="_5b2655c7-fba1-41f7-8884-38953b2dc37f" id="sec.928-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the application had not been decided.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_bf1b998c-e712-4aa6-924c-e164ae58a21e" id="sec.928-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the dealing is of a type that is a permitted dealing, the application is taken to be an application under this Act for approval of a permitted dealing.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_dbedc77c-4db2-40b1-8fd8-441aa2735826" id="sec.928-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Otherwise, the application lapses.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_502b098b-e909-45ec-91ff-94cb726d5dbb" id="sec.929" provision.type="transitional" spent.amends="0"><no>929</no><heading guid="_42f947d2-6d9b-4a07-acf8-2077bcc13e55" id="sec.929-he">Continuance of fees under <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref></heading><subclause affected.by.uncommenced="0" guid="_1dd968a8-a085-44ca-a9d9-fd6100d0fd83" id="sec.929-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Subsection (2) applies if a fee (the <defterm guid="_33ece2b0-afb0-46ee-890c-b1fbc18a555f" id="sec.929-def.existingfee" type="definition">existing fee</defterm>) for a matter relating to a type of authority under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> (the <defterm guid="_38937470-79d2-4e6c-81d8-04185635471c" id="sec.929-def.correspondingmatter" type="definition">corresponding matter</defterm>) is imposed under that Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_fc4a0664-df02-4e4d-b2cb-6de3241e4db4" id="sec.929-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Until a fee is prescribed for the corresponding matter for the corresponding type of authority under this Act, the existing fee is taken to be the prescribed fee under this Act for the corresponding matter.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_60458e53-d7ec-4884-b3f0-c9f831f1ed71" id="sec.929-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Subsection (2) applies to a petroleum authority whether or not it—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9a5cea08-c8ca-4d15-8285-d78c04ed3ea2" id="sec.929-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">was granted under this Act; or</txt></block></li><li guid="_520c205b-148c-439b-844f-ae4c250de88c" id="sec.929-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is a converted petroleum authority.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_80b3cf59-6473-489f-ac52-584e032a893f" id="sec.929-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Subsection (5) applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a23ea6e8-ffc4-495f-a834-c4591543c9cd" id="sec.929-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">under a converted petroleum authority, a fee (also the <defterm guid="_5a036a0c-65ec-432e-be1c-8e68068e4e0c" id="sec.929-ssec.4-def.existingfee" type="definition">existing fee</defterm>) is imposed for a matter relating to the authority; and</txt></block></li><li guid="_fdf6e89a-df7b-4ec9-9f9e-fe6365d5f1ba" id="sec.929-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> does not provide for a fee for the matter.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8f23b4e1-c7a9-4ab8-a808-fdaf4daeb28d" id="sec.929-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">Until a fee is prescribed for the corresponding matter for the converted petroleum authority, the existing fee is taken to be the prescribed fee under this Act for the corresponding matter under this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6191bb2f-662f-4e99-a803-9475a0d0b420" id="sec.929-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_8648b4c9-1eb2-4eed-8b38-5f25d999d6f3" id="sec.929-ssec.6-def.fee_"><txt break.before="1"><defterm guid="_7549b320-af9b-44ad-b08a-7bc8878463e3" id="sec.929-ssec.6-def.fee" type="definition">fee</defterm> includes application fee, annual or other rent, licence fee and petroleum royalty.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_fac2543f-21c5-45b1-a9c0-e7cf400ba474" id="sec.930" provision.type="transitional" spent.amends="0"><no>930</no><heading guid="_887d42df-baa3-444e-b409-4e056019d646" id="sec.930-he">Fees for existing applications</heading><block><txt break.before="1">If—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_583a16b5-72d1-4bbb-b121-4b722875464f" id="sec.930-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before 31 December 2004, an application had been made for or about an approval, authority, lease, licence or permission under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> that becomes, or will, if granted, become a petroleum authority under this Act; and</txt></block></li><li guid="_993166a8-96ff-4ffc-ab4e-e0078bcc9cf5" id="sec.930-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a fee is prescribed under this Act for the application or the corresponding application under this Act;</txt></block></li></list></block><block><txt break.before="1">the Minister may waive payment of the fee, in whole or part.</txt></block></clause><clause affected.by.uncommenced="0" guid="_8ef97e0b-7c5e-44f5-b7d9-9c054be5ea8a" id="sec.931" provision.type="transitional" spent.amends="0"><no>931</no><heading guid="_b29ae307-6a30-4f70-9d9c-cb698b0d1881" id="sec.931-he">References in Acts and documents to <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref></heading><subclause affected.by.uncommenced="0" guid="_458263f6-f8f7-4cc8-8c80-b04b19da9545" id="sec.931-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Subject to divisions 2 and 5, a reference in an Act or document to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_03d0683a-8bd0-42ad-af5b-dd04d9468e02" id="sec.931-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> is, if the context permits, a reference to this Act; and</txt></block></li><li guid="_2a0fae5f-81ae-4c93-b0c9-cbedb078aa8d" id="sec.931-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a provision of the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> is, if the context permits, a reference to the corresponding provision of this Act.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_be598da0-afef-45e1-8db5-95adbab20016" id="sec.931-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">However, subsection (1) does not apply if the reference is in relation to a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> petroleum tenure—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b78b9fbe-bfae-4b50-8ae5-65a4cb2d8395" id="sec.931-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that, on 31 December 2004, does not become a converted petroleum tenure; or</txt></block></li><li guid="_572ebcb5-22da-4731-adaf-6f07bc58ff56" id="sec.931-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">until the tenure becomes a replacement tenure, on or after the commencement of the <legref check="valid" jurisd="QLD" target.doc.id="act-2005-003" target.version.series="88658b29-ad9e-4d54-9119-7a844f214e07" type="act"><name emphasis="yes">Petroleum and Other Legislation Amendment Act 2005</name></legref>.</txt></block></li></list></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_86eb9420-94d3-4736-b022-fc7a9bd38857" id="ch.15-pt.4"><no>Part 4</no><heading guid="_5727555a-e445-4f00-a6ad-2a6bce66fd11" id="ch.15-pt.4-he">Transitional provisions for <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act"><name emphasis="no">Petroleum and Gas (Production and Safety) Act 2004</name></legref></heading><division affected.by.uncommenced="0" guid="_ebea5285-0776-4d55-b7e2-b7cd24172ba8" id="ch.15-pt.4-div.1"><no>Division 1</no><heading guid="_a35b795a-4d36-4d68-aea4-caa517f36057" id="ch.15-pt.4-div.1-he">Provisions for particular existing mining tenements</heading><clause affected.by.uncommenced="0" guid="_eb843931-02ae-435a-b687-3dce597bca84" id="sec.932" provision.type="transitional" spent.amends="0"><no>932</no><heading guid="_f8da69ce-9d7f-4901-9f0a-09f9a8813c13" id="sec.932-he">Application of s 6 to particular existing mining tenements</heading><subclause affected.by.uncommenced="0" guid="_7295fe46-6ecd-4a03-a9d7-9c133eae9ea4" id="sec.932-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to a mining tenement in force immediately before the commencement, other than a coal or oil shale mining tenement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1945b079-3d53-447e-9382-d647322de293" id="sec.932-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Section 6 applies to the mining tenement as if it had been granted after the commencement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_96fa614e-bdb8-4a9b-8fef-63f3a6170a87" id="sec.932-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, for a mining tenement other than a mining lease, section 6(3) and (6) does not apply for the carrying out of an authorised activity for a petroleum authority in the area of the tenement until 3 months after the commencement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_12e34eef-5449-4f1d-8fae-1b10e797868b" id="sec.932-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.403" target.doc.id="act-1989-110" target.guid="_acc1b576-5463-4539-9121-24fca0813d33" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 403</legref>, does not apply for the carrying out of the authorised activity until 3 months after the commencement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4f8f498b-8405-4014-8836-4f733c1fee7f" id="sec.932-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_36c7581a-92ef-45b4-b0c1-e28ff9a5c0a7" id="sec.932-ssec.5-def.commencement_"><txt break.before="1"><defterm guid="_442479e9-62a8-4ae1-acfc-fc65b497b589" id="sec.932-ssec.5-def.commencement" type="definition">commencement</defterm> means the day section 6 commences.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_ae9fc87e-d527-4d92-ba9f-ab31ebf5e640" id="sec.933" provision.type="transitional" spent.amends="0"><no>933</no><heading guid="_63bcda3f-fc24-4c5b-909a-79986b6f405b" id="sec.933-he">Deferral of s 115(1) for existing petroleum leases</heading><block><txt break.before="1">Section 115(1) does not apply to the holder of a petroleum lease in force on the commencement of this section until 12 months after 31 December 2004.</txt></block></clause></division><division affected.by.uncommenced="0" guid="_2aedbc7d-9205-4ba4-990e-6b7a7625ad2f" id="ch.15-pt.4-div.2"><no>Division 2</no><heading guid="_2e3c0f35-b826-4363-a2c9-a0beb64c7c52" id="ch.15-pt.4-div.2-he">Provision for coal seam gas</heading><clause affected.by.uncommenced="0" guid="_843684ca-024d-4366-9357-0e69570bf9c5" id="sec.934" provision.type="transitional" spent.amends="0"><no>934</no><heading guid="_4ff4e63e-f239-404b-9c4e-b56af14b369e" id="sec.934-he">Substituted restriction for petroleum leases relating to mineral hydrocarbon mining leases</heading><subclause affected.by.uncommenced="0" guid="_6519a1e8-d2db-4490-9bc5-80d0019bc018" id="sec.934-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If section 364 applies for a petroleum lease and any applicant for the petroleum lease was the holder of a relevant mineral hydrocarbon mining lease, that section applies as if the reference in section 364(2)(b) to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bfc356de-f203-445a-a3f7-8073f84e299c" id="sec.934-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">incidental coal seam gas were a reference to coal seam gas; and</txt></block></li><li guid="_44a8b54f-e0b2-4aed-8846-820d8b6db897" id="sec.934-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the mine working envelope were a reference to the area of the mineral hydrocarbon mining lease.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7b567fe6-a082-4df5-a6c7-e05b5bbcc45a" id="sec.934-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_4246d1e5-2f92-4f9b-97ae-92584e1546cf" id="sec.934-ssec.2-def.relevantmineralhydrocarbonmininglease_"><txt break.before="1"><defterm guid="_15956a37-6d37-4aaf-8105-e0a0d27cb91c" id="sec.934-ssec.2-def.relevantmineralhydrocarbonmininglease" type="definition">relevant mineral hydrocarbon mining lease</defterm> means a mineral hydrocarbon mining lease, the area of which includes the overlapping ATP land to which section 364 applies.</txt></definition></deflist></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_56ecf7ea-f121-4d57-9784-70a9c76ccb21" id="ch.15-pt.4-div.3"><no>Division 3</no><heading guid="_27c5edb2-77db-4f66-85e6-23a49e95fcc0" id="ch.15-pt.4-div.3-he">Provisions for existing <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref> bores</heading><clause affected.by.uncommenced="0" guid="_8892a52e-2429-4e3b-b2f0-49ed1b380c81" id="sec.934A" provision.type="transitional" spent.amends="0"><no>934A</no><heading guid="_53c264a5-e012-4311-b4f4-b76bc1e8ac7f" id="sec.934A-he">Exemption from, or deferral of, reporting provisions for existing petroleum tenure holders</heading><subclause affected.by.uncommenced="0" guid="_ddd1b08a-1012-4ccf-89ee-d3dcdb7fc021" id="sec.934A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the holder of any petroleum tenure under which petroleum production is carried out before 30 June 2005.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_dec1c09f-c4ad-452e-b140-71decdbd8ba3" id="sec.934A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The holder must, within 12 months after 31 December 2004, lodge at the following office a statement about the need to have an underground water impact report for the tenure—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_767a13be-3dbb-4957-aea2-a6ea6d5d5f99" id="sec.934A-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the office of the department for lodging the statement, as stated in a gazette notice by the chief executive;</txt></block></li><li guid="_98b5a4ea-d7e4-4294-967a-84ca4531dec2" id="sec.934A-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if no office is gazetted under paragraph (a)—the office of the chief executive.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a9cb8458-ed86-4f27-ada5-cfe9357e5291" id="sec.934A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive may, after considering the statement, decide whether an underground water impact report is required for the tenure.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a4a6f545-3e3d-4625-9bc6-b0dbf5156376" id="sec.934A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive may require the holder to give the chief executive further information to enable the chief executive to make a decision under subsection (3).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_90428207-71d6-426d-8d6f-c22993885a9b" id="sec.934A-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">If the chief executive decides an underground water impact report is not required, sections 256 and 267 are taken never to have applied to the holder.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_5548b6bd-9266-4306-a850-c3fe89afac3d" id="sec.934A-ssec.6" provision.type="other"><no>(6)</no><block><txt break.before="0">If the chief executive decides an underground water impact report is required, the chief executive may decide a reasonable time by which the report must be lodged.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e5e5e73b-fbf6-4bb9-b9fd-f3eeaff37e35" id="sec.934A-ssec.7" provision.type="other"><no>(7)</no><block><txt break.before="0">If, under subsection (6), the chief executive decides a time, section 256 is taken not to apply to the holder until that time.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e1e5d073-e47b-4304-b673-0feba6cac525" id="sec.934A-ssec.8" provision.type="other"><no>(8)</no><block><txt break.before="0">A decision under this section has no effect until the holder is given notice of it.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_99efd6c0-1760-47ab-8b7d-d824ec1235ca" id="sec.934B" provision.type="transitional" spent.amends="0"><no>934B</no><heading guid="_fe1af0bb-c252-485e-bbf5-3ca1038139e9" id="sec.934B-he">Make good obligation only applies for existing <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref> bores on or from 31 December 2004</heading><block><txt break.before="1">Section 250 only applies in relation to an existing <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref> bore that was in existence on 31 December 2004 or came into existence after that day.</txt></block></clause></division><division affected.by.uncommenced="0" guid="_1b3ba76f-833f-4ef5-8c43-4623734d827a" id="ch.15-pt.4-div.4"><no>Division 4</no><heading guid="_b3b992b5-8711-4534-b96b-1450aa402fbc" id="ch.15-pt.4-div.4-he">Miscellaneous provisions</heading><clause affected.by.uncommenced="0" guid="_9a5426c4-0619-411b-99ab-5f55baa82785" id="sec.935A" provision.type="transitional" spent.amends="0"><no>935A</no><heading guid="_11476960-c160-45d8-8122-11b40e428b30" id="sec.935A-he">Deferred application of s 526 for particular petroleum authority holders</heading><block><txt break.before="1">If, immediately before 31 December 2004, a petroleum authority holder is lawfully carrying out an authorised activity for the authority on public land, section 526 does not apply to the holder until 6 months after 31 December 2004.</txt></block></clause><clause affected.by.uncommenced="0" guid="_6a2765ed-c12a-4bf5-a418-d90413fce524" id="sec.936" provision.type="transitional" spent.amends="0"><no>936</no><heading guid="_c2c87fbe-9a1d-416d-9570-295596aa1d53" id="sec.936-he">Deferral of s 803 for existing petroleum facilities</heading><block><txt break.before="1">Section 803 does not apply for a petroleum facility that was operating at any time within 2 weeks before the commencement of that section until 1 year after the commencement.</txt></block></clause><clause affected.by.uncommenced="0" guid="_b92049bb-8485-43fc-9291-39b80b1689f6" id="sec.937" provision.type="transitional" spent.amends="0"><no>937</no><heading guid="_b06b08a3-1a08-4cf3-a307-7e1354342889" id="sec.937-he">Existing operating plant</heading><subclause affected.by.uncommenced="0" guid="_c43de9fd-d615-4ffc-813d-ff8a06c7f6f6" id="sec.937-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Until 1 July 2005, chapter 9, parts 2 and 4, (other than part 4, division 7) do not apply to plant operated, or an activity carried out, under this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1dab3c4b-2d82-41e9-8184-8116cbb3f2bb" id="sec.937-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Until chapter 9, parts 2 and 4 apply, the following continue to apply to the plant or activity—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3f66f8fa-f339-4d1d-bccb-fafb2b562f45" id="sec.937-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the repealed <legref check="valid" jurisd="QLD" target.doc.id="act-1965-068" target.version.series="3854c22f-a82b-44b6-b1bd-ca9f6dd56dbf" type="act"><name emphasis="yes">Gas (Residual Provisions) Act 1965</name></legref> as in force immediately before the commencement;</txt></block></li><li guid="_021224fe-78e9-4c61-a7ff-8c6b302ce395" id="sec.937-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> as in force immediately before the commencement.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_5018f7f2-626d-4edd-9263-d00a4374c18e" id="sec.938" provision.type="transitional" spent.amends="0"><no>938</no><heading guid="_bb66a05c-bb7d-4d1b-b505-21495ddf2edc" id="sec.938-he">Exclusion of ch 5, pt 3, div 1 for continuance of particular existing road uses</heading><subclause affected.by.uncommenced="0" guid="_d7a88d3c-7d44-4c09-91c4-122892a209c3" id="sec.938-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">If, immediately before the commencement, a petroleum authority holder was using a public road in the area of the authority for transport relating to a seismic survey or drilling activity, chapter 5, part 3, division 1 does not apply for the use while it continues.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a71810ab-25c7-487f-b959-cf8468a0ac66" id="sec.938-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Subsection (1) applies for the use (the <defterm guid="_77cc2d1c-155d-40dc-be45-cd7e7800f2cd" id="sec.938-def.haulageuse" type="definition">haulage use</defterm>) by a petroleum authority holder of a public road for haulage that relates to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f9602850-e4a3-45f9-903c-f293e482937a" id="sec.938-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the transportation of petroleum produced or processed in the area of the authority; or</txt></block></li><li guid="_2341c296-941e-462e-a969-3330c4e17e78" id="sec.938-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the construction of a pipeline.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_6392cd59-e4c2-4f72-b30f-361f6d934795" id="sec.938-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Chapter 5, part 3, division 1 does not apply for the haulage use if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1c1f8734-4319-4712-9f49-4a5a2d65919d" id="sec.938-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">at any time within 12 months before the commencement, the holder was carrying out the haulage use; and</txt></block></li><li guid="_42ee9940-fb68-4450-950a-6db39be6d582" id="sec.938-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the type of haulage under the haulage use is the same, or substantially the same, as the type of haulage carried out within the 12 months.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c2fd61fd-9629-4b2d-b4f1-39c7b3f3ff1b" id="sec.938-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Subsection (1) applies even if the haulage use stops and later starts again.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e210df12-92a4-4792-b15f-d6290918126a" id="sec.938-ssec.4A" provision.type="other"><no>(4A)</no><block><txt break.before="0">A reference to chapter 5, part 3, division 1 in this section is taken to include a reference to the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-2014-047" target.guid="_78e7ee55-dcff-4087-b0b9-13497e839af3" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">chapter 3</legref>, <legref check="valid" jurisd="QLD" refid="ch.3-pt.3" target.doc.id="act-2014-047" target.guid="_bdb2d16b-be5f-49e4-add9-ce41b99ca361" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">part 3</legref>, <legref check="invalid" jurisd="QLD" type="act">division 2</legref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8d2242a5-5623-4537-9c5d-5fb073f57461" id="sec.938-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_00ed7afd-7704-4b2f-81c3-1966dfb99454" id="sec.938-ssec.5-def.commencement_"><txt break.before="1"><defterm guid="_0e190939-0e43-47a4-8f1e-31409ac0e2b1" id="sec.938-ssec.5-def.commencement" type="definition">commencement</defterm> means the day section 516 commences.</txt></definition></deflist></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_0cbd3119-d142-4368-94d5-66950e20e357" id="ch.15-pt.5"><no>Part 5</no><heading guid="_14db58ee-20a6-4d66-9d23-3deda13f500c" id="ch.15-pt.5-he">Transitional provisions for <legref check="valid" jurisd="QLD" target.doc.id="act-2005-003" target.version.series="88658b29-ad9e-4d54-9119-7a844f214e07" type="act"><name emphasis="no">Petroleum and Other Legislation Amendment Act 2005</name></legref></heading><clause affected.by.uncommenced="0" guid="_73ed7ada-fff8-4bcc-a7bc-4ba2b15ae108" id="sec.938A" provision.type="transitional" spent.amends="0"><no>938A</no><heading guid="_f09e4af4-4a2f-4bbb-b6e6-804d26ae94a3" id="sec.938A-he">Pipeline licences</heading><subclause affected.by.uncommenced="0" guid="_aec3f457-4c4c-45e6-b58e-2bbe73b6d1f9" id="sec.938A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies for a pipeline licence that became a converted licence under section 916(2)(a).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4466b871-ad3e-4436-a32d-de3ec4184dc4" id="sec.938A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On the day the <legref check="valid" jurisd="QLD" target.doc.id="act-2005-003" target.version.series="88658b29-ad9e-4d54-9119-7a844f214e07" type="act"><name emphasis="yes">Petroleum and Other Legislation Amendment Act 2005</name></legref> commences, the converted licence becomes a point-to-point pipeline licence under this Act.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_e2ea1d0e-b989-4774-979a-39689a89b9f8" id="sec.938B" provision.type="transitional" spent.amends="0"><no>938B</no><heading guid="_22f1921b-384a-4b38-ae33-029699df0d84" id="sec.938B-he">Requests for pipeline licences</heading><subclause affected.by.uncommenced="0" guid="_6fb39699-4d69-4c33-a33c-33706d0e1473" id="sec.938B-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies for a request mentioned in section 917 that has not been decided before the day the <legref check="valid" jurisd="QLD" target.doc.id="act-2005-003" target.version.series="88658b29-ad9e-4d54-9119-7a844f214e07" type="act"><name emphasis="yes">Petroleum and Other Legislation Amendment Act 2005</name></legref> commences.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7ce3a69b-cb64-48f7-a8bc-b5d2dcd41290" id="sec.938B-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On the day that Act commences, the request is taken to be a request for a point-to-point pipeline licence under this Act.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a5cef49a-c44b-44a5-b98d-f942f173d520" id="sec.938C" provision.type="transitional" spent.amends="0"><no>938C</no><heading guid="_95fc625c-6634-44ab-9144-e8b103385f9c" id="sec.938C-he"><legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> water bores</heading><subclause affected.by.uncommenced="0" guid="_9f517636-7971-45c3-a080-b16aec536296" id="sec.938C-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Subsection (2) applies for a water bore—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f1946c9f-11e4-41a5-9f07-fd060e61526e" id="sec.938C-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">drilled with the permission of the Minister under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.86" target.doc.id="act-1923-026" target.guid="_593999fa-d23e-4c97-9fdf-a02ca846b21d" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act">section 86</legref>; and</txt></block></li><li guid="_285d7159-449a-42f5-ba3b-5e255f45fa5e" id="sec.938C-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">within the area of a converted petroleum tenure.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_8e9efdbc-1661-4dd5-b0e3-85e7f6e9270c" id="sec.938C-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On and from the day the <legref check="valid" jurisd="QLD" target.doc.id="act-2005-003" target.version.series="88658b29-ad9e-4d54-9119-7a844f214e07" type="act"><name emphasis="yes">Petroleum and Other Legislation Amendment Act 2005</name></legref> commences, the water bore—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b84c6924-63bd-457d-8a2d-972799affc21" id="sec.938C-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is taken to be a water supply bore under this Act; and</txt></block></li><li guid="_c290359b-d2da-43f2-8eea-3bf54f5a59ca" id="sec.938C-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">may be transferred without complying with section 288(3).</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_21c0da8d-6dd6-4b6c-a527-8914efff327f" id="sec.938C-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Subsection (4) applies for a water bore—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a4059151-16eb-46ca-94f5-a0f7133b78b0" id="sec.938C-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">drilled with the permission of the Minister under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.86" target.doc.id="act-1923-026" target.guid="_593999fa-d23e-4c97-9fdf-a02ca846b21d" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act">section 86</legref>; and</txt></block></li><li guid="_a17e41ec-8ffd-4042-aa1a-6ccf856b4028" id="sec.938C-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">within the area of a replacement tenure.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3494a452-8279-4cf8-8077-0503843a057e" id="sec.938C-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">On and from the day the area becomes a replacement tenure, the water bore—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_90fd2655-f89f-4ecf-9b95-0582c4a77c80" id="sec.938C-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is taken to be a water supply bore under this Act; and</txt></block></li><li guid="_1f02cdd7-7dc1-43cb-a203-98f589c1cb5d" id="sec.938C-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">may be transferred without complying with section 288(3).</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_4035efad-7cc4-403c-86f5-a5932ae11252" id="sec.938D" provision.type="transitional" spent.amends="0"><no>938D</no><heading guid="_b29d374c-f369-423a-bf8b-6f65d66e8232" id="sec.938D-he">Decommissioning wells and bores</heading><subclause affected.by.uncommenced="0" guid="_0f467276-2a5c-40f9-a2a3-cbf3940f04e3" id="sec.938D-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Until 1 July 2005, subsection (2) applies to a well or bore mentioned in section 292 instead of section 292(4)(a).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_504066e6-4145-4934-bc49-ed8fb3d62935" id="sec.938D-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The well or bore must be plugged and abandoned under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>, as the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> was immediately before the commencement of this section.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_67ee1c7c-8bf5-4f41-8cf6-e07b36f98ea5" id="ch.15-pt.6"><no>Part 6</no><heading guid="_d6397df6-5fd9-4bb8-910d-b13cace5008a" id="ch.15-pt.6-he">Transitional provision for <legref check="valid" jurisd="QLD" target.doc.id="act-2007-046" target.version.series="bb8d945d-f8b8-4a9e-a29d-6b852071ae3e" type="act"><name emphasis="no">Mining and Other Legislation Amendment Act 2007</name></legref></heading><clause affected.by.uncommenced="0" guid="_930d346b-6cab-4378-87a4-f4cdbd0b806b" id="sec.939" provision.type="transitional" spent.amends="0"><no>939</no><heading guid="_83521f1a-a49d-4691-908e-84230af6f0ab" id="sec.939-he">Provision for amendment of s 893</heading><block><txt break.before="1">Chapter 15, part 3, division 5, subdivision 1 applies as if the amendment of section 893 under the <legref check="valid" jurisd="QLD" target.doc.id="act-2007-046" target.version.series="bb8d945d-f8b8-4a9e-a29d-6b852071ae3e" type="act"><name emphasis="yes">Mining and Other Legislation Amendment Act 2007</name></legref> had commenced on 31 December 2004.</txt></block></clause></part><part affected.by.uncommenced="0" guid="_47619c7e-025a-4c2b-b98d-91154941bc3f" id="ch.15-pt.7"><no>Part 7</no><heading guid="_b7c6b12d-dc8b-4e4f-880d-0703b1dec770" id="ch.15-pt.7-he">Transitional provisions for the <legref check="valid" jurisd="QLD" target.doc.id="act-2008-039" target.version.series="f7631585-bd61-492f-ab60-d9d35a969933" type="act"><name emphasis="no">Revenue and Other Legislation Amendment Act 2008</name></legref>, <legref check="invalid" jurisd="QLD" refid="pt.5" target.doc.id="act-2008-039" target.version.series="f7631585-bd61-492f-ab60-d9d35a969933" type="act">part 5</legref></heading><clause affected.by.uncommenced="0" guid="_c70c9eba-52d5-43da-9ad2-37be6527cf3e" id="sec.940" provision.type="transitional" spent.amends="0"><no>940</no><heading guid="_d9731a55-fc9d-4287-a96e-bd7a62e0cbd1" id="sec.940-he">Quarter to which post-amended ss 593 and 594 first apply</heading><subclause affected.by.uncommenced="0" guid="_27fc11e9-ce2d-457a-847c-d6926f8d9836" id="sec.940-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Post-amended sections 593 and 594 first apply in relation to petroleum produced, disposed of or stored in the quarter ending 30 September 2008.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_570a5294-d175-405f-b90b-b43a76da9cc6" id="sec.940-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_e6ea85af-2cca-490d-9d84-3d67e342f691" id="sec.940-ssec.2-def.postamendedsections593and594_"><txt break.before="1"><defterm guid="_b683346b-98d9-4b85-b459-13c6ede29ae1" id="sec.940-ssec.2-def.postamendedsections593and594" type="definition">post-amended sections 593 and 594</defterm> means sections 593 and 594 as amended by the <legref check="valid" jurisd="QLD" target.doc.id="act-2008-039" target.version.series="f7631585-bd61-492f-ab60-d9d35a969933" type="act"><name emphasis="yes">Revenue and Other Legislation Amendment Act 2008</name></legref>, <legref check="invalid" jurisd="QLD" refid="pt.5" target.doc.id="act-2008-039" target.version.series="f7631585-bd61-492f-ab60-d9d35a969933" type="act">part 5</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_59ceb787-2f59-4190-b946-ec7c1fa239a0" id="sec.940-ssec.2-def.quarter_"><txt break.before="1"><defterm guid="_1a6d7b4b-25ae-45d4-941c-43420e6c07af" id="sec.940-ssec.2-def.quarter" type="definition">quarter</defterm> see section 592A.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c4a22b8b-7693-4be9-b071-60a958410c4b" id="sec.941" provision.type="transitional" spent.amends="0"><no>941</no><heading guid="_ea9f713e-4ef3-4798-bbf6-62f5c0b5eeaa" id="sec.941-he">Pre-amended Act applies to certain months</heading><subclause affected.by.uncommenced="0" guid="_c6b3a11d-f670-4941-9fba-ffe80f9fb30d" id="sec.941-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Sections 593 and 594 of the pre-amended Act and the other provisions of the pre-amended Act continue to apply in relation to each month, ending before 1 July 2008, in which petroleum was produced, disposed of or stored.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_027da145-bd17-44dd-b461-990b18607794" id="sec.941-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_6f47dab6-3264-41eb-a278-238fe8625c6b" id="sec.941-ssec.2-def.preamendedAct_"><txt break.before="1"><defterm guid="_a84fdace-37bd-467c-acfc-927edadd9b4d" id="sec.941-ssec.2-def.preamendedAct" type="definition">pre-amended Act</defterm> means this Act as in force before the commencement of the <legref check="valid" jurisd="QLD" target.doc.id="act-2008-039" target.version.series="f7631585-bd61-492f-ab60-d9d35a969933" type="act"><name emphasis="yes">Revenue and Other Legislation Amendment Act 2008</name></legref>, <legref check="invalid" jurisd="QLD" refid="pt.5" target.doc.id="act-2008-039" target.version.series="f7631585-bd61-492f-ab60-d9d35a969933" type="act">part 5</legref>.</txt></definition></deflist></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_617d1c35-953f-4f34-8e37-a26ec12ebe40" id="ch.15-pt.8"><no>Part 8</no><heading guid="_bf83be37-1d73-4c6c-ad04-9ccb9e309b27" id="ch.15-pt.8-he">Transitional provision for <legref check="valid" jurisd="QLD" target.doc.id="act-2008-056" target.version.series="5fdd5cba-4218-4882-b3f0-e8ff3ed16ad5" type="act"><name emphasis="no">Mines and Energy Legislation Amendment Act 2008</name></legref></heading><clause affected.by.uncommenced="0" guid="_e8810587-bb46-4e47-92a0-afb64f502991" id="sec.942" provision.type="transitional" spent.amends="0"><no>942</no><heading guid="_58e91b30-c676-421d-9c7f-5ecb97ebe161" id="sec.942-he">Provision for amendment of s 877</heading><block><txt break.before="1">Section 877 applies as if the amendment of that section under the <legref check="valid" jurisd="QLD" target.doc.id="act-2005-003" target.version.series="88658b29-ad9e-4d54-9119-7a844f214e07" type="act"><name emphasis="yes">Petroleum and Other Legislation Amendment Act 2005</name></legref>, <legref check="invalid" jurisd="QLD" refid="sec.105" target.doc.id="act-2005-003" target.version.series="88658b29-ad9e-4d54-9119-7a844f214e07" type="act">section 105</legref>, schedule had never been made.</txt></block></clause></part><part affected.by.uncommenced="0" guid="_b9fc2c7f-13ea-4f21-bd18-bd9aad7d6538" id="ch.15-pt.9"><no>Part 9</no><heading guid="_e7a6237c-ffad-4515-b46d-1c2ecd5f607e" id="ch.15-pt.9-he">Transitional provisions for <legref check="valid" jurisd="QLD" target.doc.id="act-2010-017" target.version.series="538fa011-ecbe-4731-a71c-a0e83f6c5a0e" type="act"><name emphasis="no">Mines and Energy Legislation Amendment Act 2010</name></legref></heading><clause affected.by.uncommenced="0" guid="_d7b7887e-8392-4c3a-826b-0da94d243aad" id="sec.943" provision.type="transitional" spent.amends="0"><no>943</no><heading guid="_87664dba-d0f2-4216-bb31-4341f3716dc5" id="sec.943-he">Definitions for pt 9</heading><block><txt break.before="1">In this part—</txt><deflist><definition affected.by.uncommenced="0" guid="_7e7b6025-c250-4611-838b-b02123d79d48" id="sec.943-def.commencement_"><txt break.before="1"><defterm guid="_44e513a0-40a7-489f-98b3-9eaf1410fbf8" id="sec.943-def.commencement" type="definition">commencement</defterm>, for sections 945 and 946, means the day this section commences.</txt></definition><definition affected.by.uncommenced="0" guid="_fe18e9b7-95cd-44de-9082-8709625ebd7f" id="sec.943-def.previous_"><txt break.before="1"><defterm guid="_51ba5b58-d94e-40ba-8699-a499db137f5d" id="sec.943-def.previous" type="definition">previous</defterm>, in relation to a stated provision that includes a number, means the provision as in force immediately before the commencement.</txt></definition></deflist></block></clause><clause affected.by.uncommenced="0" guid="_09013c24-17de-4a22-b519-9aec974062d1" id="sec.944" provision.type="transitional" spent.amends="0"><no>944</no><heading guid="_220f64f6-a453-48db-bdb8-585a55395e4d" id="sec.944-he">Continuation of authorisation to carry out particular gas work—gas device (type A)</heading><subclause affected.by.uncommenced="0" guid="_e940e76f-d1ce-4f89-a755-3026ec04f369" id="sec.944-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ee8ad273-b4d3-4bac-86e6-c209e2f1ca30" id="sec.944-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to a gas work authorisation or an interim gas work authorisation—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7d01ba72-7138-4382-bb32-0c6e9ad4c5ef" id="sec.944-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">in force immediately before the commencement; and</txt></block></li><li guid="_9ae9dc12-5f34-4cba-afc7-be949f20f77b" id="sec.944-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">under which an individual is authorised to carry out gas work in relation to a gas device (type B) under previous section 724(3) (the <defterm guid="_8f75e74d-3aee-4446-9941-24702d2a3381" id="sec.944-ssec.1-para1.a-def.formertypeBdevice" type="definition">former type B device</defterm>); and</txt></block></li></list></block></li><li guid="_68d61aad-8560-498e-a786-1f938c21f3ef" id="sec.944-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if, on or after the commencement, the former type B device is or becomes a gas device (type A).</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_013d79d0-3221-409d-abcd-e2979e5eaefc" id="sec.944-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For this Act, the individual is taken to be authorised, under the gas work authorisation or interim gas work authorisation, to carry out gas work in relation to the gas device (type A) until the earliest of the following to happen—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d554b8cf-59da-4144-b1b3-2d207f6b683f" id="sec.944-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the day that is 6 months after the commencement;</txt></block></li><li guid="_a5241c7c-7542-410a-b5fe-00cfff4531f0" id="sec.944-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the day the term of the gas work authorisation or interim gas work authorisation ends;</txt></block></li><li guid="_f23e821f-78db-4f41-979f-a0083856c088" id="sec.944-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the day the individual is issued with a gas work licence to carry out gas work in relation to the gas device (type A).</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ed2bce9d-d2db-410a-8b64-56794ab621c2" id="sec.944-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For section 726(1) and (2), the individual is taken to hold a gas work licence to carry out gas work in relation to the gas device (type A) while the individual is authorised under subsection (2) to carry out the gas work.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3e634f21-b089-4fe7-808c-aaf7082be053" id="sec.944-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_79198f50-9289-40e5-8278-b0b5e7154912" id="sec.944-ssec.4-def.commencement_"><txt break.before="1"><defterm guid="_f2c3b608-48e8-4fb3-bb95-7533e0f86d2b" id="sec.944-ssec.4-def.commencement" type="definition">commencement</defterm> means the day this section commences.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_dc6befa6-11cb-40c6-92ff-44b7c66a03ca" id="sec.945" provision.type="transitional" spent.amends="0"><no>945</no><heading guid="_acc9fa7c-031f-41c1-81a2-d1162a4cb675" id="sec.945-he">Continuation of authorisation to carry out particular gas work—fuel gas refrigeration device</heading><subclause affected.by.uncommenced="0" guid="_de27e49a-ff3b-4108-a672-86b0cb21bc69" id="sec.945-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to a gas work authorisation or an interim gas work authorisation—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_60b2468b-d17f-4a2f-8534-f49d29bcd8bb" id="sec.945-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in force immediately before the commencement; and</txt></block></li><li guid="_bdf28db1-2d95-472b-8dca-525a9b135078" id="sec.945-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">under which an individual is authorised to carry out gas work in relation to a gas device or type of gas device that on the commencement is a fuel gas refrigeration device.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ad07a813-3c75-4936-aef9-e413a0af582a" id="sec.945-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For this Act, the individual is taken to be authorised, under the gas work authorisation or interim gas work authorisation, to carry out gas work in relation to the fuel gas refrigeration device until the earliest of the following to happen—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d78c6383-a3d4-47bc-93fb-df92e50053a0" id="sec.945-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the day that is 6 months after the commencement;</txt></block></li><li guid="_34b98633-5b6a-4603-80f9-5e7d5d80486d" id="sec.945-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the day the term of the gas work authorisation or interim gas work authorisation ends;</txt></block></li><li guid="_2a5bc014-1abf-4b70-952c-a4a96e6ebaa1" id="sec.945-ssec.2-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the day the individual is issued with a gas work licence to carry out gas work in relation to the fuel gas refrigeration device.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_937e2f06-03f5-42a0-842f-1c45517228a9" id="sec.945-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For section 726(1) and (2), the individual is taken to hold a gas work licence to carry out gas work in relation to the fuel gas refrigeration device while the individual is authorised under subsection (2) to carry out the gas work.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_80231e74-b0f5-46a5-97e6-ef8f228c9de4" id="sec.946" provision.type="transitional" spent.amends="0"><no>946</no><heading guid="_2459b2c7-4392-408b-8b5e-2db1189b87bd" id="sec.946-he">Application of notice requirement under s 733</heading><block><txt break.before="1">Section 733(2) does not apply to a person supplying a gas device until the day that is 3 months after the commencement.</txt></block></clause></part><part affected.by.uncommenced="0" guid="_942d188f-f4fd-4320-ba33-21ad3620c1b1" id="ch.15-pt.10"><no>Part 10</no><heading guid="_4c3078ec-d6cc-4cc9-b875-68221dbd97d7" id="ch.15-pt.10-he">Transitional provisions for amendments under <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Energy Act 2010</name></legref></heading><division affected.by.uncommenced="0" guid="_236149f9-31ab-41ad-ba73-32f563b22216" id="ch.15-pt.10-div.1"><no>Division 1</no><heading guid="_a51e9794-0360-487e-bad1-a28e2f03bdc2" id="ch.15-pt.10-div.1-he">Provisions about mineral (f) pilot tenures</heading><clause affected.by.uncommenced="0" guid="_dab54c1a-6703-4913-938a-50a324b46cec" id="sec.947" provision.type="transitional" spent.amends="0"><no>947</no><heading guid="_71688491-2c9c-449a-a9e2-1da32ba74528" id="sec.947-he">Applications for particular petroleum leases</heading><block><txt break.before="1">Section 363K applies to an ATP-related application, if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5b36e104-b5c0-4d81-a9b6-b39f2b7c186c" id="sec.947-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the application was made before the commencement of this section; and</txt></block></li><li guid="_17836dc9-4cde-4008-8765-c8dbb1955fc3" id="sec.947-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">immediately before the commencement, the application has not been decided; and</txt></block></li><li guid="_55da5a61-2cd8-483d-bbaa-fc7235cd1b05" id="sec.947-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the application includes land that is overlapping mineral (f) land or land in the area of MDLA 407.</txt></block></li></list></block></clause></division><division affected.by.uncommenced="0" guid="_29700581-b88b-4bf2-8eba-6d30a155c232" id="ch.15-pt.10-div.2"><no>Division 2</no><heading guid="_4c9d0d0c-3b8c-4518-9ccc-4c711fc6e06e" id="ch.15-pt.10-div.2-he">Provisions about land access and compensation</heading><clause affected.by.uncommenced="0" guid="_d2879373-2051-480b-a715-aceb4f5083a1" id="sec.948" provision.type="transitional" spent.amends="0"><no>948</no><heading guid="_d7bfec67-6e62-442f-86eb-775237dd42f5" id="sec.948-he">Land access code prevails over conditions</heading><block><txt break.before="1">If a condition of a petroleum authority is inconsistent with a mandatory provision of the land access code, the mandatory provision prevails to the extent of the inconsistency.</txt></block></clause><clause affected.by.uncommenced="0" guid="_cbd731ba-6cea-4bb2-bd8a-9c7bb38f2709" id="sec.949" provision.type="transitional" spent.amends="0"><no>949</no><heading guid="_5127cdbe-64ee-4865-9f72-e1ed8114c124" id="sec.949-he">Existing compensation agreements other than for notifiable road uses</heading><subclause affected.by.uncommenced="0" guid="_665b566a-27ac-4f03-9c8c-3e71abb9d50e" id="sec.949-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if immediately before the commencement of this section a compensation agreement under chapter 5, part 5 was in force.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_4af4db92-5b27-4069-a0a2-d8554132edbc" id="sec.949-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On the commencement the agreement becomes a conduct and compensation agreement under chapter 5, part 5, division 1.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_8761940e-0bfd-4752-8bfe-1b3cfd99af14" id="sec.950" provision.type="transitional" spent.amends="0"><no>950</no><heading guid="_6ce6896b-de73-4eea-ba73-b5169eb0df3c" id="sec.950-he">Existing entry notices</heading><subclause affected.by.uncommenced="0" guid="_493da335-c4d1-4fff-b09f-53f06f42ba68" id="sec.950-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to an entry notice for the carrying out of an authorised activity for a petroleum authority if the notice complied with the entry notice requirements before the commencement of this section.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d429cd12-e996-4554-8bb6-3922ccadb51c" id="sec.950-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice continues, according to its terms, to be valid for the carrying out of the activity after the commencement even though the notice does not comply with all of the entry notice requirements from the commencement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_02bf14ae-4a6e-4c50-8a7c-de5d3dc38bbc" id="sec.950-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_a674389b-074f-46a5-a4de-914a0580b1cd" id="sec.950-ssec.3-def.entrynoticerequirements_"><txt break.before="1"><defterm guid="_e64a5e03-730f-4ce9-bd38-7a070c2eedd0" id="sec.950-ssec.3-def.entrynoticerequirements" type="definition">entry notice requirements</defterm> means the requirements under this Act relating to the giving of an entry notice.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_6705ca3a-bb33-4126-817a-85fc50e60897" id="sec.951" provision.type="transitional" spent.amends="0"><no>951</no><heading guid="_10ff7b32-bc35-4049-987f-65864054de83" id="sec.951-he">References to geothermal tenure</heading><block><txt break.before="1">Until the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="yes">Geothermal Energy Act 2010</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.9" target.doc.id="act-2010-031" target.guid="_97df2812-c390-4c64-9776-5186bbcd5c46" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act">chapter 9</legref>, <legref check="valid" jurisd="QLD" refid="ch.9-pt.1" target.doc.id="act-2010-031" target.guid="_fed797e0-97c7-4867-8480-ee2b761627f5" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act">part 1</legref> commences, a reference in this Act to a geothermal tenure is taken to be a reference to a geothermal exploration permit.</txt></block></clause></division></part><part affected.by.uncommenced="0" guid="_5bfdd35d-4350-4e5f-9d63-1317ad089e37" id="ch.15-pt.11"><no>Part 11</no><heading guid="_73fdf163-3937-4b72-84f5-c179f9e2b430" id="ch.15-pt.11-he">Transitional provisions for <legref check="valid" jurisd="QLD" target.doc.id="act-2011-016" target.version.series="4dc0464f-b219-4b02-b054-388f9c565449" type="act"><name emphasis="no">Gas Security Amendment Act 2011</name></legref></heading><clause affected.by.uncommenced="0" guid="_20551aa9-8151-42ec-8c07-f039fb321606" id="sec.952" provision.type="transitional" spent.amends="0"><no>952</no><heading guid="_fffbca6c-b063-4657-8c79-a599c3aa2c80" id="sec.952-he">Definition for pt 11</heading><block><txt break.before="1">In this part—</txt><deflist><definition affected.by.uncommenced="0" guid="_9b346a04-1594-4b09-bfd9-5ca494cc8c77" id="sec.952-def.amendingAct_"><txt break.before="1"><defterm guid="_22817a10-e0dc-4d56-8dc8-5fb124f572e5" id="sec.952-def.amendingAct" type="definition">amending Act</defterm> means the <legref check="valid" jurisd="QLD" target.doc.id="act-2011-016" target.version.series="4dc0464f-b219-4b02-b054-388f9c565449" type="act"><name emphasis="yes">Gas Security Amendment Act 2011</name></legref>.</txt></definition></deflist></block></clause><clause affected.by.uncommenced="0" guid="_8d5bc356-78fd-4f80-ad8a-66a0d2452e42" id="sec.953" provision.type="transitional" spent.amends="0"><no>953</no><heading guid="_ee022f77-e09d-43c3-acf7-d0f7982b8de6" id="sec.953-he">Application of s 118 to existing applications</heading><block><txt break.before="1">Section 118, as amended by the amending Act, applies only to applications made after the commencement of this section.</txt></block></clause><clause affected.by.uncommenced="0" guid="_2728427b-a1ec-4cfc-a130-cdb822d07264" id="sec.954" provision.type="transitional" spent.amends="0"><no>954</no><heading guid="_f0bf7d63-4277-48ea-90eb-7efe41f8e5dd" id="sec.954-he">Date of effect of amendment of s 910</heading><block><txt break.before="1">Section 910(1)(a)(i), as amended by the amending Act, is taken to have had effect from 31 December 2004.</txt></block></clause></part><part affected.by.uncommenced="0" guid="_180b467d-b491-4312-bfca-dd55a54cc754" id="ch.15-pt.12"><no>Part 12</no><heading guid="_8cae7d35-77a4-4938-9e2c-c194ed29645f" id="ch.15-pt.12-he">Transitional provision for <legref check="valid" jurisd="QLD" target.doc.id="act-2011-020" target.version.series="4462a0c5-0edd-4ecd-8f29-118384a71594" type="act"><name emphasis="no">Community Ambulance Cover Levy Repeal and Revenue and Other Legislation Amendment Act 2011</name></legref></heading><clause affected.by.uncommenced="0" guid="_d3599de8-0bcd-43be-91a8-f8ec72eb9404" id="sec.956" provision.type="transitional" spent.amends="0"><no>956</no><heading guid="_89b5ec91-4027-4fac-a404-3004f42a213d" id="sec.956-he">Particular applications taken to be properly made</heading><subclause affected.by.uncommenced="0" guid="_5e1fe7d4-7b9a-4094-81aa-561986a36d93" id="sec.956-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2071f757-e600-41d2-b694-60408ee5d019" id="sec.956-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an ATP-related application or petroleum lease application for land was made on or after 17 March 2008; and</txt></block></li><li guid="_e16d3ce0-e825-432a-b241-227eb037b9b4" id="sec.956-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">under section 307, 308, 335, 336, 346 or 354 as in force before the commencement of this section (each the <defterm guid="_d9c5af7c-84a7-4f5c-bba4-9c4c597fddc1" id="sec.956-ssec.1-def.unamendedprovision" type="definition">unamended provision</defterm>), separate ATP-related applications or petroleum lease applications were required to be made for particular parts of the land; and</txt></block></li><li guid="_79ec1ff2-e7ad-487a-931f-f5248836e786" id="sec.956-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">separate mining lease applications were not made as required by the unamended provision.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_78385db2-fa93-411d-aece-c245cdbd752c" id="sec.956-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite the noncompliance with the requirement, the application is taken to be, and is taken to always have been, an ATP-related application or petroleum lease application for the land made under chapters 2 and 3.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c484d7d1-fedf-4b25-a3b2-ec03c963489e" id="sec.956-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">However, subsection (2) applies only to the extent the application does not comply with the unamended provision.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_493847be-8472-401a-81ca-066de665e9dc" id="sec.956-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">This section applies whether or not the application has been decided at the commencement.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_7a2be614-35b3-4ada-87ae-7ecd7ff2bdcc" id="ch.15-pt.13"><no>Part 13</no><heading guid="_e9c98dff-9948-4c3a-a7ec-2e8a7575eea0" id="ch.15-pt.13-he">Transitional provisions for <legref check="valid" jurisd="QLD" target.doc.id="act-2012-020" target.version.series="4e1c57a6-0c15-4ced-ab75-46bc3da1c18c" type="act"><name emphasis="no">Mines Legislation (Streamlining) Amendment Act 2012</name></legref></heading><division affected.by.uncommenced="0" guid="_bc21fca9-d83f-471a-b84f-f5aaaeaf84f8" id="ch.15-pt.13-div.1"><no>Division 1</no><heading guid="_6b26caf5-5780-455d-9149-a45d25174d7b" id="ch.15-pt.13-div.1-he">Preliminary</heading><clause affected.by.uncommenced="0" guid="_fb90f9c8-d8fd-45ce-bf6b-cdff424fa7a7" id="sec.957" provision.type="transitional" spent.amends="0"><no>957</no><heading guid="_c1dd8b7a-1c4e-4465-a894-7996265f0610" id="sec.957-he">Definitions for pt 13</heading><block><txt break.before="1">In this part—</txt><deflist><definition affected.by.uncommenced="0" guid="_89f6f8eb-bdfb-42d7-b20b-2f8531d09454" id="sec.957-def.amendingAct_"><txt break.before="1"><defterm guid="_b662645d-6894-45db-8d82-559614cd6a77" id="sec.957-def.amendingAct" type="definition">amending Act</defterm> means the <legref check="valid" jurisd="QLD" target.doc.id="act-2012-020" target.version.series="4e1c57a6-0c15-4ced-ab75-46bc3da1c18c" type="act"><name emphasis="yes">Mines Legislation (Streamlining) Amendment Act 2012</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_29a1211e-01b3-4bac-a2b1-796c2f1866a0" id="sec.957-def.commencement_"><txt break.before="1"><defterm guid="_928a9f68-d264-4564-9109-744acfae2699" id="sec.957-def.commencement" type="definition">commencement</defterm> means the commencement of the section in which the term is used.</txt></definition><definition affected.by.uncommenced="0" guid="_48a2d65e-9d98-4b46-bc0a-aa56381a358e" id="sec.957-def.former_"><txt break.before="1"><defterm guid="_1fa5d02c-1be0-4413-8e6e-0c90dbc59a04" id="sec.957-def.former" type="definition">former</defterm>, for a provision of this Act, means the provision as in force before the commencement of the section in which the term is used.</txt></definition></deflist></block></clause></division><division affected.by.uncommenced="0" guid="_0edbae53-310d-4ecc-b1da-617736050b94" id="ch.15-pt.13-div.2"><no>Division 2</no><heading guid="_98452510-298e-42b9-82b4-63c3ad10b681" id="ch.15-pt.13-div.2-he">Transitional provisions for amendments in amending Act commencing on assent</heading><clause affected.by.uncommenced="0" guid="_af42392e-6fc9-4821-8840-1a0168c0eb3f" id="sec.958" provision.type="transitional" spent.amends="0"><no>958</no><heading guid="_33572d54-bb54-4886-b5a3-7d6efd71976f" id="sec.958-he">Land in a petroleum authority’s area taken before the commencement</heading><subclause affected.by.uncommenced="0" guid="_da40311c-2be6-455a-b6fd-1155a6dff84c" id="sec.958-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ab3c76af-f0e4-411f-b11f-1385077b2b2c" id="sec.958-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">land in a petroleum authority’s area was taken under a resumption law before the commencement; and</txt></block></li><li guid="_43a06a83-e8e8-4b59-b933-1493e563f745" id="sec.958-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">at the commencement, the entity taking the land has not taken action indicating the petroleum authority was extinguished (wholly or partly) when the land was taken.</txt><note guid="_d458c393-9ca5-4837-b090-ea6095784d9c" id="sec.958-ssec.1-para1.b-note" type="example"><heading guid="_c9fe7bc6-a6e4-4adb-9bf8-df2baf31f905" id="sec.958-ssec.1-para1.b-note-he">Examples of action for paragraph (b)—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_5dbe084b-3455-4c3b-a7c7-ce6a479bdb2a" id="sec.958-ssec.1-para1.b-note-para2" provision.type="other"><no>•</no><block><txt break.before="0">serving a copy of the resumption notice for the taking of the land on the petroleum authority holder (in the holder’s capacity as the holder of the authority)</txt></block></li><li guid="_780b6104-1cff-41d3-a05f-fbdb65752333" id="sec.958-ssec.1-para1.b-note-para2-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">entering into a resumption agreement under the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="no">ALA</name></legref> with the petroleum authority holder for the taking of the land</txt></block></li><li guid="_2ba1dc18-3e68-40c8-8634-6238137f1521" id="sec.958-ssec.1-para1.b-note-para2-oc.3" provision.type="other"><no>•</no><block><txt break.before="0">negotiating, or taking other action relating to, the compensation payable to the petroleum authority holder for the taking of the land</txt></block></li><li guid="_e3d5010c-ac0b-4962-b318-7d8a50ee3993" id="sec.958-ssec.1-para1.b-note-para2-oc.4" provision.type="other"><no>•</no><block><txt break.before="0">paying compensation to the petroleum authority holder for the taking of the land</txt></block></li><li guid="_559bd419-09f2-4a70-95bd-e58fa025c8e1" id="sec.958-ssec.1-para1.b-note-para2-oc.5" provision.type="other"><no>•</no><block><txt break.before="0">arranging for the taking of the land to be recorded in the petroleum register against the petroleum authority</txt></block></li></list></block></note></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a7aa771d-ff44-4c4c-8b15-5c8b9fc249da" id="sec.958-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The taking of the land did not extinguish (wholly or partly) the petroleum authority or any other petroleum interest relating to the authority.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8f93381b-97ed-49bc-860a-7d1e3206ee41" id="sec.958-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Subsection (2) does not affect the ending of a petroleum interest (wholly or partly) in any other way, including, for example—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_546b2da6-305d-4160-a79a-17b49c3ffdaa" id="sec.958-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">by the entity taking the land acquiring the petroleum interest (wholly or partly) under a separate commercial agreement or other arrangement with the holder of the interest; or</txt></block></li><li guid="_d1117e91-08fc-496d-a33c-419825aca1c4" id="sec.958-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">by the petroleum interest holder surrendering the interest (wholly or partly) under this Act.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_1ea79809-22d1-4455-a47f-9a0391ecd077" id="sec.959" provision.type="transitional" spent.amends="0"><no>959</no><heading guid="_260f35f5-2468-4088-9018-15ac7f7e894b" id="sec.959-he">Land in a petroleum authority’s area for which notice of intention to resume given before the commencement</heading><subclause affected.by.uncommenced="0" guid="_651c4509-dd22-4d44-8336-7a7fcdb69f2a" id="sec.959-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a606e71c-4ab9-46f9-8214-09d459b7af48" id="sec.959-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before the commencement, an entity gave a notice of intention to resume for the proposed taking, under a resumption law, of land in a petroleum authority’s area; and</txt></block></li><li guid="_0d376d83-ce3f-487f-b96b-6103f770f204" id="sec.959-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">at the commencement, the land had not been taken under the resumption law.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_1a9f524d-ecbc-4e8d-a930-ea11b3d02106" id="sec.959-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If the land is taken other than by taking or otherwise creating an easement, sections 30AA to 30AD apply in relation to the taking, except that the resumption notice for the taking may provide for the extinguishment of a petroleum interest on the taking even if the notice of intention to resume does not comply with section 30AA(8).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b573925d-3cda-4b32-8d05-f404bd74005e" id="sec.959-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">If the land is taken by taking or otherwise creating an easement, section 30AD applies in relation to the taking.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_ce9f1ba0-530e-4481-a8d6-0e8dc1bfedcd" id="sec.960" provision.type="transitional" spent.amends="0"><no>960</no><heading guid="_3eb3a9c4-d614-4eb6-bc5f-4e3426d2357c" id="sec.960-he">Existing water pipeline for petroleum lease</heading><subclause affected.by.uncommenced="0" guid="_dc606e3e-d776-491e-af26-4e871d8913b4" id="sec.960-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, before the commencement, the holder of a petroleum lease had started constructing or operating a water pipeline under former section 110.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_78b0590b-4ac0-412f-b144-5d6d385a5f1f" id="sec.960-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Former section 110 continues to apply to the holder of the relevant lease until 1 year after the commencement as if the amending Act had not commenced.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_38c873c8-5355-4444-a77c-f7b6b0a2e794" id="sec.961" provision.type="transitional" spent.amends="0"><no>961</no><heading guid="_664e7fbd-3d44-4316-a86e-a5d244106346" id="sec.961-he">Existing written permission to enter land to construct and operate pipeline</heading><subclause affected.by.uncommenced="0" guid="_41cb22c8-8a60-4f5f-95ad-1beb49224567" id="sec.961-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, before the commencement, a pipeline licence holder has obtained the written permission of the owner of land to enter the land to construct and operate a pipeline the subject of the licence.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ef3bad09-cdc3-480c-83a4-67735b389cdb" id="sec.961-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Section 399A(2)(b) does not apply to the owner’s successors and assigns for the land.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_08da7434-5434-43c0-aac8-14e0ed0f609e" id="sec.962" provision.type="transitional" spent.amends="0"><no>962</no><heading guid="_a6e758a1-0c1c-4e08-940c-d2f72c06492f" id="sec.962-he">Authority to prospect taken to be properly granted</heading><subclause affected.by.uncommenced="0" guid="_cfbe1098-093f-4316-a815-d477b5fb586a" id="sec.962-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP application mentioned in section 889.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_c9100db5-3120-4480-bd82-3b348632a049" id="sec.962-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">An authority to prospect granted under chapter 2, part 1, division 2 before the commencement is taken to be, and to have always been, validly granted as if the closing time for the call for tenders for the authority was the day before the authority was granted.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_f30587aa-8ea5-4c82-942f-810c8d497d71" id="sec.963" provision.type="transitional" spent.amends="0"><no>963</no><heading guid="_efe5b823-2670-436b-b848-e5f3d2eacb16" id="sec.963-he">Grant applications</heading><subclause affected.by.uncommenced="0" guid="_1dc6ac9a-cc0d-4a58-9167-c284e50a71bd" id="sec.963-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Sections 910 and 912, as amended under the amending Act, apply to a grant application that was made, but not decided, before the commencement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_cf1e208b-0779-46e6-8224-6200f37bc06b" id="sec.963-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_d0916492-d8d2-4da4-b330-c3e035a812d7" id="sec.963-ssec.2-def.grantapplication_"><txt break.before="1"><defterm guid="_04c65897-4e07-43ab-bf71-d098a96a3667" id="sec.963-ssec.2-def.grantapplication" type="definition">grant application</defterm> see section 908.</txt></definition></deflist></block></subclause></clause></division><division affected.by.uncommenced="0" guid="_c53d8a1e-10f3-488d-b811-f96b14c41224" id="ch.15-pt.13-div.3"><no>Division 3</no><heading guid="_7a197793-3b40-4130-85a8-3c747d309204" id="ch.15-pt.13-div.3-he">Transitional provisions for amendments in amending Act commencing by proclamation</heading><clause affected.by.uncommenced="0" guid="_585daec4-0b8f-4796-8ae8-116534796cc5" id="sec.964" provision.type="transitional" spent.amends="0"><no>964</no><heading guid="_c7a0cd93-47a5-46eb-b873-03dbf9cc7ee6" id="sec.964-he">Definition for div 3</heading><block><txt break.before="1">In this division—</txt><deflist><definition affected.by.uncommenced="0" guid="_7bb690a0-72be-4891-aecc-bcaed3d4e194" id="sec.964-def.existingpetroleumlease_"><txt break.before="1"><defterm guid="_f344e100-571c-45cb-bb3d-5d01b8646681" id="sec.964-def.existingpetroleumlease" type="definition">existing petroleum lease</defterm> means a petroleum lease that is in effect immediately before the commencement.</txt></definition></deflist></block></clause><clause affected.by.uncommenced="0" guid="_55ce2c22-25b7-4d84-a7d3-9e975da10af1" id="sec.965" provision.type="transitional" spent.amends="0"><no>965</no><heading guid="_fc2a03b7-eff4-4893-9569-fc296826f13e" id="sec.965-he">When holder of an existing petroleum lease may apply to change production commencement day</heading><subclause affected.by.uncommenced="0" guid="_53394f6a-9af5-4524-a0a7-9acbb97446eb" id="sec.965-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the holder of an existing petroleum lease if the production commencement day for the lease is before 1 February 2014.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3a60b99b-7f2b-45e3-97d2-de87afd4dccb" id="sec.965-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The holder may apply under section 175AA in relation to the production commencement day only if the application is made no later than 6 months before the day by which petroleum production under the lease is to start.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_aea3554a-c7a5-48c0-8538-ec19a5f9829c" id="sec.965-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">This section applies despite section 175AA(c).</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_61179ff3-caa7-4399-b99d-ebfc67923926" id="sec.966" provision.type="transitional" spent.amends="0"><no>966</no><heading guid="_f805a98b-9b01-4fe4-9bfb-e01607dca59b" id="sec.966-he">Particular requirements for infrastructure reports under s 552A for existing petroleum leases</heading><subclause affected.by.uncommenced="0" guid="_0b19cfe9-b7e1-4331-8c99-799aa948da09" id="sec.966-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the holder of an existing petroleum lease.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2b78377a-c183-49c8-8035-a1c3c043828d" id="sec.966-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The first infrastructure report lodged after the commencement by the holder under section 552A for an existing petroleum lease must, in addition to the requirements mentioned in section 552B, also state—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_595d40d3-b10e-40fd-b647-94c5ca1707e5" id="sec.966-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">details of the authorised activities for the lease carried out since the lease was granted; and</txt></block></li><li guid="_64022481-006a-437a-afc2-6672ddd722d6" id="sec.966-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">details of infrastructure and works constructed in the area of the lease since the lease was granted, including the location of the infrastructure and works.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_09f934bc-26ce-468f-ac71-553272abcbb1" id="sec.967" provision.type="transitional" spent.amends="0"><no>967</no><heading guid="_e6b4fbb7-f3f8-4165-97aa-6c8f7005cc0a" id="sec.967-he">Unfinished indications about approval of dealing</heading><subclause affected.by.uncommenced="0" guid="_6a33efe8-d625-4f40-8c41-8300160ef10b" id="sec.967-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9873b779-fd71-4c57-bcfa-891febdac43d" id="sec.967-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a party to a proposed dealing made a request to the Minister under former section 571; and</txt></block></li><li guid="_fcd60caa-299b-443a-be94-cffe9c4a078f" id="sec.967-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Minister had not given the party an indication before the commencement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_4f055409-27f6-4939-8662-691f96ffc585" id="sec.967-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The Minister may continue to consider the request and give the indication under former section 571 as if the section had not been repealed by the amending Act.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_cfbdd58e-b665-4ed9-b6a7-a8bc88ad43c4" id="sec.968" provision.type="transitional" spent.amends="0"><no>968</no><heading guid="_53bbbb87-706f-4fa5-9713-03f3daabe611" id="sec.968-he">Continuing indications about approval of dealing</heading><subclause affected.by.uncommenced="0" guid="_84af0b77-2340-441a-bc70-5b0b3a9baaf8" id="sec.968-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_287d469f-84f0-4f9d-ae63-1a9c0cf62a6a" id="sec.968-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before the commencement, the Minister gave an indication of approval of a proposed dealing under former section 571; and</txt></block></li><li guid="_440f65ac-7f8e-479b-83ea-87921378d991" id="sec.968-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the indication is current at the commencement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_bc41d17f-4db2-453b-95dc-76e103a07df3" id="sec.968-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The indication of approval continues to have effect after the commencement as if former section 571 had not been repealed by the amending Act.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_dccda5f9-8f1c-4ee0-91d6-23d037835d1c" id="sec.969" provision.type="transitional" spent.amends="0"><no>969</no><heading guid="_2df29698-0d49-4250-b23e-c4814823015f" id="sec.969-he">Undecided applications for approval of dealing</heading><subclause affected.by.uncommenced="0" guid="_538d8746-4863-4cf0-a6c7-8bbb2a521e88" id="sec.969-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7853a64b-f52b-4091-bf6d-5bbcffa5c59b" id="sec.969-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a holder of a petroleum authority or interest made an application for approval of a dealing under former section 572; and</txt></block></li><li guid="_26c39b24-215b-4b01-976c-d73d74d562f8" id="sec.969-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the Minister had not granted or refused the approval before the commencement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_19922840-f980-4cb2-90be-2a21e56bebac" id="sec.969-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite the replacement of former chapter 5, part 10 by the amending Act—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_da5ecdb1-5d8a-4697-aec5-a40e728bfa4f" id="sec.969-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the Minister may continue to deal with the application; and</txt></block></li><li guid="_89ced215-68d6-45a2-b40e-1b0676e47957" id="sec.969-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">former sections 573 and 574 apply to the Minister’s decision about the application.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_9beaef04-03bb-473f-9ffc-eae623215137" id="sec.970" provision.type="transitional" spent.amends="0"><no>970</no><heading guid="_be2c3092-6068-4f30-9825-0319595f42ce" id="sec.970-he">Deciding applications for approval of assessable transfers until commencement of particular provisions</heading><subclause affected.by.uncommenced="0" guid="_77732605-f9e9-452b-91c7-9eecba7f5195" id="sec.970-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies until the commencement of the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act"><name emphasis="yes">Environmental Protection Act 1994</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.5A" target.doc.id="act-1994-062" target.guid="_2b52a4da-fe63-479a-a28d-a8c46c78d524" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act">chapter 5A</legref>, <legref check="valid" jurisd="QLD" refid="ch.5A-pt.4" target.doc.id="act-1994-062" target.guid="_ae9f3dd2-d898-45bb-bd71-d24934051a20" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act">part 4</legref> as inserted by the <legref check="valid" jurisd="QLD" target.doc.id="act-2012-016" target.version.series="d426ea1a-12a5-403e-b1fd-e94cdb4996fb" type="act"><name emphasis="yes">Environmental Protection (Greentape Reduction) and Other Legislation Amendment Act 2012</name></legref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d0248282-462e-45ce-bc8b-da10820e104d" id="sec.970-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Former section 573(2)(a) continues in force instead of section 573D(4)(a)(ii), as inserted by the amending Act, for deciding whether to give an approval of an assessable transfer.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c07e5758-7cba-4010-8f23-35f551d217b2" id="sec.971" provision.type="transitional" spent.amends="0"><no>971</no><heading guid="_b09f112b-6c01-4ad0-ac30-0ac8dc95ddae" id="sec.971-he">Uncommenced review of refusal to approve particular dealing</heading><subclause affected.by.uncommenced="0" guid="_72d56c01-8aa5-47ca-bb57-199f096ebdb9" id="sec.971-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to a person if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_44a0b872-8244-4ae9-95fb-70d6c169a817" id="sec.971-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before the commencement, the person could have applied under section 817 for an internal review of a decision about a refusal to approve a dealing under former section 573(1); but</txt></block></li><li guid="_c3d753dd-c0ac-46a9-b382-4654410c92a0" id="sec.971-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the person had not made the application before the commencement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_fc09cc63-16c4-436f-9dd3-326d55a4ab81" id="sec.971-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite the amendment of schedule 1 by the amending Act, the person continues to be a person who may apply under section 817, subject to section 818, for the decision.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_3a3fb7bf-d7d3-47e7-9772-e8bc235a75f9" id="sec.972" provision.type="transitional" spent.amends="0"><no>972</no><heading guid="_5effa85e-8d40-4550-84b9-dd4d50b50566" id="sec.972-he">Unfinished review of refusal to approve particular dealing</heading><subclause affected.by.uncommenced="0" guid="_69daf990-5a50-4671-812a-87d785a60d40" id="sec.972-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, before the commencement—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0811f6f9-a52c-40c1-a94e-476cfc560765" id="sec.972-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a person applied under section 817 for an internal review about a refusal to approve a dealing under former section 573(1); and</txt></block></li><li guid="_530145f4-5183-4224-be87-f5f07dea8cc7" id="sec.972-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the reviewer had not yet decided the review.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_68268c28-d70e-4126-8bc7-7bffe825f182" id="sec.972-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The reviewer may continue, under chapter 12, part 1, to grant a stay of the decision being reviewed and decide the review.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_746f5eb4-bc7a-4061-a0ee-a661f1be735d" id="sec.973" provision.type="transitional" spent.amends="0"><no>973</no><heading guid="_00af5bda-61b1-4054-ac34-1282026d38b0" id="sec.973-he">Amending work programs</heading><subclause affected.by.uncommenced="0" guid="_369f879a-d294-4cf8-bfe4-d4cece703750" id="sec.973-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2d3b4b1d-1522-4e9d-a21f-262632494ebe" id="sec.973-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">after the commencement, an authority to prospect holder applies for approval of an amendment of a work program for the authority (a <defterm guid="_3c4af842-e282-4724-b44d-086d60eb7d53" id="sec.973-ssec.1-def.workprogramapplication" type="definition">work program application</defterm>) mentioned in section 59(1)(b); and</txt></block></li><li guid="_180491c1-12e3-4c45-a93f-8022e5ac8006" id="sec.973-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">before the commencement—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_70325aa7-3cd3-4198-93e1-87dab2c35a96" id="sec.973-ssec.1-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a transfer of a share in the authority was approved under section 573; or</txt></block></li><li guid="_d2273fb5-8454-420c-9f0d-fa65de3effe0" id="sec.973-ssec.1-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">an application for approval of a transfer of a share in the authority was made under section 572 but had not been decided.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3de6e032-42d3-48f1-aab9-9f722319fb75" id="sec.973-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Section 59(2)(d), as amended by the amending Act, applies in relation to the work program application as if a reference—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fb91d522-fd16-4796-b0eb-4851b7c3eda8" id="sec.973-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in section 59(2)(d)(i) to an application under section 573C for approval of an assessable transfer relating to a share in the authority were a reference to an application for approval of a transfer of a share in the authority under former section 572; and</txt></block></li><li guid="_58b9aaff-63b2-466e-a6d0-4efb7d012653" id="sec.973-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">in section 59(2)(d)(ii) to approval of the assessable transfer having been given under section 573D were a reference to the approval of a transfer of a share in the authority having been given under former section 573.</txt></block></li></list></block></subclause></clause></division></part><part affected.by.uncommenced="0" guid="_06c15805-55e5-49a2-8961-c5467f9960e0" id="ch.15-pt.14"><no>Part 14</no><heading guid="_75abdb8b-b749-456f-89a9-5316ebc83eb3" id="ch.15-pt.14-he">Transitional provisions for <legref check="valid" jurisd="QLD" target.doc.id="act-2012-025" target.version.series="f34a5625-9185-4044-9ea1-1f5574d5afe7" type="act"><name emphasis="no">Fiscal Repair Amendment Act 2012</name></legref></heading><clause affected.by.uncommenced="0" guid="_47f706c5-749b-49fc-a222-49fa6c14cf05" id="sec.974" provision.type="transitional" spent.amends="0"><no>974</no><heading guid="_1457d586-31e4-4efc-b70a-bf0c37226ed0" id="sec.974-he">Application of Act to particular unpaid royalty</heading><subclause affected.by.uncommenced="0" guid="_53261ec3-b886-4714-80cd-1615be871f1c" id="sec.974-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, immediately before 1 October 2012, an amount of petroleum royalty payable by a person to the State is unpaid (the <defterm guid="_2b4a630a-7535-4fc9-a2f7-c992b1cc6e35" id="sec.974-def.unpaidpetroleumroyalty" type="definition">unpaid petroleum royalty</defterm>).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_53f6eea7-bba6-4262-96d9-a39bbf901ccb" id="sec.974-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">This Act as in force on 1 October 2012 applies in relation to the unpaid petroleum royalty on and from that day.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_abd07fd3-8bc5-4d33-b2f2-7ab96dacfd45" id="sec.974-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For applying section 602 to the unpaid petroleum royalty under subsection (2), the period in section 602(3)(b) is taken to start on 1 October 2012.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_a892178b-ef00-4e3a-bb2f-4aba88e9cf14" id="sec.975" provision.type="transitional" spent.amends="0"><no>975</no><heading guid="_67017f7d-3d2f-43cc-b0c4-03ba5902a80d" id="sec.975-he">Remission of late payment fee under s 595</heading><block><txt break.before="1">Section 595(5), as in force on 1 October 2012, applies in relation to a fee paid or payable under section 595 before, on or after that date.</txt></block></clause></part><part affected.by.uncommenced="0" guid="_54ac9ba8-bb49-46e3-9784-c6057a016a9f" id="ch.15-pt.15"><no>Part 15</no><heading guid="_bc205a45-da3d-478d-bb79-573616c551b8" id="ch.15-pt.15-he">Transitional provision for <legref check="valid" jurisd="QLD" target.doc.id="act-2013-010" target.version.series="d09d3292-3984-4b86-b7c6-c25de951e777" type="act"><name emphasis="no">Mining and Other Legislation Amendment Act 2013</name></legref></heading><clause affected.by.uncommenced="0" guid="_55cecc3c-aa3d-48f2-8eb8-96922e8ac5cc" id="sec.976" provision.type="transitional" spent.amends="0"><no>976</no><heading guid="_2d5dd004-3226-4cad-8f64-29b970597a7c" id="sec.976-he">Existing competitive tenders</heading><subclause affected.by.uncommenced="0" guid="_d7ec1a56-6ffa-422e-95f8-4c13e6c2e36d" id="sec.976-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">Subsection (2) applies in relation to a call for tenders under chapter 2, part 1, if the call has not been decided at the commencement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_336adf47-ac9f-47a0-a518-d48b075568b4" id="sec.976-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite section 39(b), the Minister must not use a multiple round process to decide the call.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_aa82d28e-77c1-4fd6-af5e-1ee6cce5021e" id="sec.976-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Subsection (4) applies in relation to a call for tenders under chapter 2, part 2, if the call has not been decided at the commencement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_6cfb079a-9a77-4660-9bf7-a559f8f986bf" id="sec.976-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Despite section 130(b), the Minister must not use a multiple round process to decide the call.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b316b38c-38a9-4902-ae85-8ed21dd0dd3d" id="sec.976-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_558bde51-a2e4-4d4d-a2a8-31a7714e1619" id="sec.976-ssec.5-def.multipleroundprocess_"><txt break.before="1"><defterm guid="_bd716465-f20e-48a0-8c07-239b60c36624" id="sec.976-ssec.5-def.multipleroundprocess" type="definition">multiple round process</defterm> means a process involving short-listing a group of possible preferred tenderers and inviting them to engage in another round of tendering before appointing a preferred tenderer from that group.</txt></definition></deflist></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_a058bbc3-68cd-457f-964c-89223c2ebcea" id="ch.15-pt.16"><no>Part 16</no><heading guid="_acf53a81-ca06-479b-9e54-c5ca1f0922a1" id="ch.15-pt.16-he">Transitional provisions for <legref check="valid" jurisd="QLD" target.doc.id="act-2013-023" target.version.series="112c4ad2-e75f-445b-bf13-21664fb9cc0c" type="act"><name emphasis="no">Land, Water and Other Legislation Amendment Act 2013</name></legref></heading><clause affected.by.uncommenced="0" guid="_be4379f5-f229-4d83-b672-aca4d6c4ef3d" id="sec.977" provision.type="transitional" spent.amends="0"><no>977</no><heading guid="_d3a2f5e0-fd45-43b0-8164-6cffe8742963" id="sec.977-he">Definitions for pt 16</heading><block><txt break.before="1">In this part—</txt><deflist><definition affected.by.uncommenced="0" guid="_3b1fcf6f-ad1b-4ab2-9203-f8e0e44ab36f" id="sec.977-def.commencement_"><txt break.before="1"><defterm guid="_985af1cd-c071-4184-9b85-a524d320773e" id="sec.977-def.commencement" type="definition">commencement</defterm> means the commencement of the provision in which the word appears.</txt></definition><definition affected.by.uncommenced="0" guid="_84a3bb5e-49e6-43da-99f2-c8febece0b21" id="sec.977-def.previous_"><txt break.before="1"><defterm guid="_cc3b620b-da44-4b77-92d4-571311f47966" id="sec.977-def.previous" type="definition">previous</defterm>, for a provision of this Act, means the provision as in force immediately before the commencement.</txt></definition></deflist></block></clause><clause affected.by.uncommenced="0" guid="_35e9ca3c-fcff-4fa9-89fa-02367938aee3" id="sec.978" provision.type="transitional" spent.amends="0"><no>978</no><heading guid="_8c819855-3827-4402-a191-3194ee269209" id="sec.978-he">Continuation of conversion of well</heading><subclause affected.by.uncommenced="0" guid="_2ca665a6-315b-4164-9cb8-4ae36301811d" id="sec.978-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, immediately before the commencement, a petroleum tenure holder was converting a petroleum well to a water supply bore under section 283.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_be85bbbb-6b1f-415f-8f12-86b8eab019b6" id="sec.978-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On the commencement, previous chapter 2, part 10, division 2 continues to apply to the holder until the well is converted to a water supply bore.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_4ecab7d2-9931-4948-bb87-e77854585aed" id="sec.979" provision.type="transitional" spent.amends="0"><no>979</no><heading guid="_8b3e09e6-3c87-4da3-886b-c8e6639f93ea" id="sec.979-he">Drilling water observation bores or water supply bores</heading><subclause affected.by.uncommenced="0" guid="_5d57d29e-b5ac-4bde-b364-628a680b9956" id="sec.979-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if immediately before the commencement a person, other than a licensed water bore driller, was drilling a water observation bore or water supply bore under section 282.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_78d06e3a-6c72-4f86-9620-969556aa7da8" id="sec.979-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On the commencement, previous section 282 continues to apply to the person until the water observation bore or water supply bore is completed.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_25ad658b-bb40-4d6e-a430-12d0f519c44b" id="sec.980" provision.type="transitional" spent.amends="0"><no>980</no><heading guid="_e9e332b8-fc34-44e4-a98f-f1429e32ddd5" id="sec.980-he">Converting petroleum wells to water supply bores</heading><subclause affected.by.uncommenced="0" guid="_41cb501a-9813-4687-aa72-f201064799b9" id="sec.980-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, immediately before the commencement—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_72649fbf-340b-417b-90ac-901c0c0830cf" id="sec.980-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a petroleum tenure holder was converting a petroleum well to a water supply bore under section 283; and</txt></block></li><li guid="_84566e05-fbc4-4d26-8551-97642a3e046f" id="sec.980-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the holder was not converting the well as allowed under section 978.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_fd804824-f6cd-4dfe-b505-c6351d616f2b" id="sec.980-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On the commencement—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_069c29b2-6670-4b20-8050-da611f517152" id="sec.980-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the holder is taken to be converting the petroleum well to a water supply bore under new section 283; and</txt></block></li><li guid="_6d301de6-134b-4918-86e0-d4a24adbf4da" id="sec.980-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">new chapter 2, part 10, division 2 applies.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_bc5cd7b4-545b-4fab-afd8-4dc836507d27" id="sec.980-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_fa3aa18d-ad36-44a0-ab64-efbba65810fd" id="sec.980-ssec.3-def.newchapter2part10division2_"><txt break.before="1"><defterm guid="_c1d5b460-81e2-4fb0-9bab-bdf38ec8e0ef" id="sec.980-ssec.3-def.newchapter2part10division2" type="definition">new chapter 2, part 10, division 2</defterm> means chapter 2, part 10, division 2 as inserted under the <legref check="valid" jurisd="QLD" target.doc.id="act-2013-023" target.version.series="112c4ad2-e75f-445b-bf13-21664fb9cc0c" type="act"><name emphasis="yes">Land, Water and Other Legislation Amendment Act 2013</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_9a7119f1-26bd-4f1f-ab48-93b987150a3d" id="sec.980-ssec.3-def.newsection283_"><txt break.before="1"><defterm guid="_636666b4-2e12-4c66-a0d4-290d07fc8cce" id="sec.980-ssec.3-def.newsection283" type="definition">new section 283</defterm> means section 283 as inserted under the <legref check="valid" jurisd="QLD" target.doc.id="act-2013-023" target.version.series="112c4ad2-e75f-445b-bf13-21664fb9cc0c" type="act"><name emphasis="yes">Land, Water and Other Legislation Amendment Act 2013</name></legref>.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b017dad4-2f07-4749-a01c-c5d21dda309b" id="sec.981" provision.type="transitional" spent.amends="0"><no>981</no><heading guid="_bca18936-73d1-4d98-90ad-7b3e7fc4b472" id="sec.981-he">Statement on approved form under s 288 if bore drilled or well converted before the commencement</heading><subclause affected.by.uncommenced="0" guid="_776d2293-b165-4380-a015-d700fcb69276" id="sec.981-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a petroleum tenure holder or water monitoring authority holder is transferring, under section 288—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bcc919c0-c5ce-4f1c-a2f1-2ce4dfe51bb4" id="sec.981-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a water observation bore or water supply bore drilled under previous section 282; or</txt></block></li><li guid="_cdd218ab-8bd5-479f-8099-d77e7fd87f60" id="sec.981-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a water supply bore converted from a petroleum well under previous section 283.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_22f5d108-3ad0-4a23-a6fc-5523c5048ae1" id="sec.981-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The requirement under section 288(4)(a) is taken to be satisfied if the holder gives the chief executive a signed notice stating—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_15614d2a-d13c-4be6-ac90-95654b5a557e" id="sec.981-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the bore has been drilled under previous section 282—previous section 282 has been complied with for the bore; or</txt></block></li><li guid="_3b772d17-30cc-4604-90df-d6a12c6bf817" id="sec.981-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the bore has been converted from a petroleum well under previous section 283—previous section 283 has been complied with for the bore.</txt></block></li></list></block></subclause></clause><clause affected.by.uncommenced="0" guid="_31648322-c2f0-4b65-af1e-022fe0c6e930" id="sec.982" provision.type="transitional" spent.amends="0"><no>982</no><heading guid="_726cd1bc-f81c-449a-aafe-94c5537956fa" id="sec.982-he">Statement on approved form under s 290 if water observation bore drilled before the commencement</heading><subclause affected.by.uncommenced="0" guid="_6bd49457-bc35-4db7-91b9-2ab3c99e8908" id="sec.982-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a petroleum tenure holder or a water monitoring authority holder is transferring, under section 290, a water observation bore drilled under previous section 282.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_88fa09ab-0173-4436-b1a0-7509505c0416" id="sec.982-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The requirement under section 290(2) is taken to be satisfied if the holder gives the chief executive a signed notice stating previous section 282 has been complied with for the bore.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_79dfa46d-7d6b-44a0-90d9-5f4ff7ae1544" id="ch.15-pt.17" numbering.style="manual"><no>Part 17</no><heading guid="_eb3bd87e-398d-43f1-9832-d357284f19a7" id="ch.15-pt.17-he">Transitional provision for <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Mineral and Energy Resources (Common Provisions) Act 2014</name></legref></heading><clause affected.by.uncommenced="0" guid="_42201a65-f081-464d-9ae4-8422ba35bd28" id="sec.983" provision.type="transitional" spent.amends="0"><no>983</no><heading guid="_ed15c6ac-1805-42e0-bcc9-204c8798062d" id="sec.983-he">Continued appeal right for particular decisions</heading><subclause affected.by.uncommenced="0" guid="_2eff9f4b-ba5e-4351-a05a-da6182662d8b" id="sec.983-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A person who, before the commencement of this section, may have appealed against a relevant decision to the Land Court under section 823(3), may still appeal against the decision, in compliance with chapter 12, part 2, despite the amendment of schedule 1, table 2 by the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_07adc9e4-3288-4202-b536-329a41167293" id="sec.983-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_32835cef-d1bd-449a-b6b4-8762f33585b7" id="sec.983-ssec.2-def.previous_"><txt break.before="1"><defterm guid="_7b0deae1-3d13-4d80-a3a7-efee053c0482" id="sec.983-ssec.2-def.previous" type="definition">previous</defterm>, for a provision of this Act, means the provision as in force immediately before the repeal of the provision under the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_befd7be4-1fe4-4846-a8f8-7e300c090f0a" id="sec.983-ssec.2-def.relevantdecision_"><txt break.before="1"><defterm guid="_7a28b204-d137-41ca-b169-351799679573" id="sec.983-ssec.2-def.relevantdecision" type="definition">relevant decision</defterm> means any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5c3bf292-b89f-4611-add6-176f7333bd76" id="sec.983-ssec.2-def.relevantdecision-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a decision to give a road use direction under previous section 517(1);</txt></block></li><li guid="_908e58cf-d9d4-4b5e-a0c4-8a26a6a97621" id="sec.983-ssec.2-def.relevantdecision-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the imposition of a condition on entry on public land under previous section 527(1), other than a condition agreed to or requested by the relevant petroleum authority holder;</txt></block></li><li guid="_b47bf7bf-caee-415d-918d-68866a72431b" id="sec.983-ssec.2-def.relevantdecision-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a refusal to approve an assessable transfer under previous section 573D(1).</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_dff5a24e-fe2c-43be-93e2-3785e1196199" id="sec.984" provision.type="transitional" spent.amends="0"><no>984</no><heading guid="_bb82230a-bd55-4c15-9b8e-6686ad34c857" id="sec.984-he">Existing practice manuals</heading><subclause affected.by.uncommenced="0" guid="_ae7ea08b-e35e-4797-b56e-b66dfd01c8e2" id="sec.984-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">A practice manual kept under former section 858A continues in effect until the chief executive makes a manual available under the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.202" target.doc.id="act-2014-047" target.guid="_d10df67e-56a6-483e-ade1-709dbda3a60c" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">section 202</legref><legref check="invalid" jurisd="QLD" type="act">(4)</legref><legref check="invalid" jurisd="QLD" type="act">(b)</legref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_97cd258a-d543-4a47-b5ba-76d38d79d60e" id="sec.984-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_f3c1dce8-6a6c-4454-9ed2-00af1ed95e60" id="sec.984-ssec.2-def.formersection858A_"><txt break.before="1"><defterm guid="_c2bc5346-6487-4f76-b353-e229688063ca" id="sec.984-ssec.2-def.formersection858A" type="definition">former section 858A</defterm> means section 858 as in force immediately before the commencement of this section.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_0b9af1d4-2d8d-4bcb-8a26-fee206d6bc9f" id="sec.985" provision.type="transitional" spent.amends="0"><no>985</no><heading guid="_912ed9d6-0cc0-4267-932d-e21c7aa536be" id="sec.985-he">Existing application for data acquisition authority</heading><subclause affected.by.uncommenced="0" guid="_ec93bd46-9f90-4fc8-91c5-9c2cd8ca9e7c" id="sec.985-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to an application for a data acquisition authority under section 176 if, immediately before the commencement of this section, the application had not been decided.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3f726ec6-8e3d-4d9d-a8ec-77002801a83f" id="sec.985-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If, under section 178, the Minister decides to grant the data acquisition authority, the Minister may decide the term of the authority ends at a time stated in the authority that is no later than 2 years after the authority takes effect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ac0ef686-87e7-4901-8a3c-57e8dd45f03a" id="sec.985-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">This section applies despite section 178(4) of the pre-amended Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_97e08353-d0bf-481f-abf6-2c6f2ef293a4" id="sec.985-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_3e2d56e4-2e87-4683-9d0b-788d5c042bb2" id="sec.985-ssec.4-def.preamendedAct_"><txt break.before="1"><defterm guid="_b1137282-39bd-4211-8225-b82c70cf20d2" id="sec.985-ssec.4-def.preamendedAct" type="definition">pre-amended Act</defterm> means this Act as in force immediately before the commencement of this section.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_81b9eab1-7c36-465a-ab95-867dcab32a0a" id="sec.986" provision.type="transitional" spent.amends="0"><no>986</no><heading guid="_880037f0-21d1-48c3-8acc-b42307f61474" id="sec.986-he">Existing application for survey licence</heading><subclause affected.by.uncommenced="0" guid="_6a5b34b3-576e-4abc-b310-2931d89697a1" id="sec.986-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to an application for a survey licence under section 395 if, immediately before the commencement of this section, the application had not been decided.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7342ac29-3cfd-409e-8a5a-26ee7ac0b63f" id="sec.986-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If, under section 396, the Minister decides to grant the survey licence, the Minister may decide the term of the licence ends at a time stated in the licence that is no later than 2 years after the licence takes effect.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f8321136-42cb-4d22-8e85-6ea890d3f8b1" id="sec.986-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">This section applies despite section 396(4) of the pre-amended Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7eea270c-6580-42e3-9de9-6c21f9dfae8a" id="sec.986-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_74d9430e-4da2-45ff-90c2-7e9511211129" id="sec.986-ssec.4-def.preamendedAct_"><txt break.before="1"><defterm guid="_1e6a1ea4-b931-4a45-8d75-310bc99701ab" id="sec.986-ssec.4-def.preamendedAct" type="definition">pre-amended Act</defterm> means this Act as in force immediately before the commencement of this section.</txt></definition></deflist></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_7648c630-959e-481e-aef6-904f24d4cde7" id="ch.15-pt.18"><no>Part 18</no><heading guid="_2289ccaa-5e6b-41da-b4c0-567970bc8890" id="ch.15-pt.18-he">Transitional provisions for <legref check="valid" jurisd="QLD" target.doc.id="act-2014-035" target.version.series="ef6edf47-f1bc-43a3-8214-fd72d32600df" type="act"><name emphasis="no">Revenue Legislation Amendment Act 2014</name></legref></heading><clause affected.by.uncommenced="0" guid="_15837d66-e52e-4e63-b259-cf7549aaf4d6" id="sec.988" provision.type="transitional" spent.amends="0"><no>988</no><heading guid="_883a3732-1f53-45d7-91c1-b7e915dd507c" id="sec.988-he">Application of assessment and royalty penalty provisions for petroleum royalty payable for period occurring before 1 July 2014</heading><subclause affected.by.uncommenced="0" guid="_0ed3f894-7880-4ba1-ba54-d6046c160cce" id="sec.988-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The assessment and royalty penalty provisions apply in relation to petroleum royalty payable by a petroleum producer for a royalty return period or annual return period even if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_461eeb81-7684-4c94-89e0-5fe8b278ba2e" id="sec.988-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the period started before 1 July 2014; and</txt></block></li><li guid="_74d7a198-b203-47b6-90d0-e50e4269f47b" id="sec.988-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the producer is liable to pay a royalty penalty amount because of a particular act or omission mentioned in section 601A, and the act or omission occurred before 1 July 2014.</txt></block></li></list><note guid="_6b5e8d4a-f601-458d-bf41-e69a1bb502d8" id="sec.988-ssec.1-note" type="example"><heading guid="_be8ede1d-df73-4532-a33b-e75147a27fe0" id="sec.988-ssec.1-note-he">Example—</heading><block><txt break.before="1">The Minister may make an assessment, reassessment or default assessment of a royalty-related amount payable by a petroleum producer for a period under chapter 6, part 2, division 3 as in force on and from 1 July 2014, even if the period started before 1 July 2014.</txt></block></note></block></subclause><subclause affected.by.uncommenced="0" guid="_5155b5dd-794d-4a15-acb0-7a1cb6480913" id="sec.988-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For applying subsection (1) in relation to royalty payable for a royalty return period or annual return period occurring before 1 July 2014, a determination by the Minister of the petroleum royalty payable on lodgement of a royalty return or annual royalty return for the period under this Act, as in force before 1 July 2014, is taken to be an assessment of royalty payable for the period.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_f7b326a0-8190-48ae-8ec9-8e4ec9872cd9" id="sec.988-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Subsection (4) applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_51dd8c18-a236-47ae-86fc-6285427bd954" id="sec.988-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the petroleum royalty paid by a petroleum producer for a royalty return period or annual return period that ended before 1 July 2014 is less than the petroleum royalty payable by the producer for the period (a <defterm guid="_e007f8d8-c67a-48d9-8ad2-45ae8f88e3d2" id="sec.988-ssec.3-def.royaltyshortfall" type="definition">royalty shortfall</defterm>); and</txt></block></li><li guid="_0afec030-4e8e-4240-8a9d-5458bcb76369" id="sec.988-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">before 31 December 2014, the producer gives the Minister notice, in the approved form, of the royalty shortfall, including the amount of the royalty shortfall; and</txt></block></li><li guid="_910d07e4-76a0-4ee6-a598-8ddb90b4984a" id="sec.988-ssec.3-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">before the producer gives the Minister the notice, the Minister has not already notified the producer of the royalty shortfall; and</txt></block></li><li guid="_c92dca01-c6ae-4563-aa82-4f728af01b9d" id="sec.988-ssec.3-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">after the commencement, the Minister makes a default assessment or reassessment of the royalty payable by the producer for the period.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a8a383b3-9e42-4203-bcfc-39aed558cc2a" id="sec.988-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The producer is not, under section 601, liable for a royalty penalty amount in relation to the royalty shortfall under the default assessment or reassessment.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_9b8a3c6f-5313-492f-b146-8cec36377143" id="sec.988-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_e4d6570f-c851-4ca5-89c1-32fc4314c7ac" id="sec.988-ssec.5-def.assessmentandroyaltypenaltyprovisions_"><txt break.before="1"><defterm guid="_bc5201c6-613a-4e52-b2cb-af757c616658" id="sec.988-ssec.5-def.assessmentandroyaltypenaltyprovisions" type="definition">assessment and royalty penalty provisions</defterm> means the following provisions—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_14fd76a9-ac82-4f70-b874-ff452f6fef77" id="sec.988-ssec.5-def.assessmentandroyaltypenaltyprovisions-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">chapter 6, part 2, divisions 1 and 3;</txt></block></li><li guid="_4af4eb75-7579-42fa-a09b-49b20efb44e6" id="sec.988-ssec.5-def.assessmentandroyaltypenaltyprovisions-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">sections 601 to 601B.</txt></block></li></list></definition></deflist></block></subclause><note guid="_384dd1f1-ffe1-4939-93f8-bccd70eabc1c" id="sec.988-note" type="example"><heading guid="_d8f7fa34-898a-46ab-ac79-a4a1dccdb916" id="sec.988-note-he">Note—</heading><block><txt break.before="1">For the validity of determinations of petroleum royalty made before 1 July 2014, see also section 1001.</txt></block></note></clause><clause affected.by.uncommenced="0" guid="_819db448-dc9e-47fd-a505-147b929d33a8" id="sec.989" provision.type="transitional" spent.amends="0"><no>989</no><heading guid="_c2c58923-2ecd-4cc8-81ce-40211d17fe15" id="sec.989-he">Application of s 604AB to particular administrators</heading><block><txt break.before="1">Section 604AB applies to an administrator appointed before 1 July 2014 as if the required date under section 604AB(1) were the later of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0e27339c-5362-4076-8d6c-56b148b7c241" id="sec.989-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the date 14 days after the commencement; or</txt></block></li><li guid="_da197803-11ef-4d52-aa7d-030da1cc998c" id="sec.989-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the required date for section 604AB(1).</txt></block></li></list></block></clause></part><part affected.by.uncommenced="0" guid="_4bbb1222-d310-459e-8a93-f2dba28b5083" id="ch.15-pt.19"><no>Part 19</no><heading guid="_7ffab133-d037-472e-99e8-2910d2e7a161" id="ch.15-pt.19-he">Transitional and validation provisions for <legref check="valid" jurisd="QLD" target.doc.id="act-2014-064" target.version.series="576be06b-64ae-4e68-a107-8630189f1cf2" type="act"><name emphasis="no">Water Reform and Other Legislation Amendment Act 2014</name></legref></heading><clause affected.by.uncommenced="0" guid="_9b4fe6f3-1f7d-4a7b-a97b-4678afc0785e" id="sec.990" provision.type="transitional" spent.amends="0"><no>990</no><heading guid="_9ea8ff88-3568-48aa-b146-8dcb2e5da30e" id="sec.990-he">Application of joint interaction management plan provisions</heading><subclause affected.by.uncommenced="0" guid="_631d6a49-823a-4e83-ab62-ccbf8475ef70" id="sec.990-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">The pre-amended Act continues to apply in relation to the following for a period of 6 months after the commencement as if the joint interaction management plan provisions had not commenced—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_41166f39-aafb-4a88-aa62-e6d57c047038" id="sec.990-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an operating plant, or the area of a petroleum tenure in which an operating plant is situated, mentioned in the pre-amended Act, section 386(1)(a);</txt></block></li><li guid="_ff4f9888-26af-4282-b3e9-73cd69ce7ce9" id="sec.990-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an operating plant, the area of a coal or oil shale mining lease (the <defterm guid="_0d392fb4-408a-4802-9626-11dcbdc7e750" id="sec.990-ssec.1-def.leasearea" type="definition">lease area</defterm>) in which an operating plant is situated, or an area adjacent to the lease area, mentioned in the pre-amended Act, section 705(a);</txt></block></li><li guid="_c9d961dc-26f0-4f4e-ab13-0bfe5fc8cd7b" id="sec.990-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">an activity under an authority to prospect (csg) carried out in an overlapping area the subject of the authority to prospect (csg), within the meaning of the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, if coal mining operations under an exploration permit (coal), mineral development licence (coal) or mining lease (coal) within the meaning of that Act are also carried out in the overlapping area.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_4e8d6d86-6e53-48d3-af5a-9f077276856e" id="sec.990-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite subsection (1), a principal hazard management plan made under the pre-amended Act, section 705A is to be known as a ‘joint interaction management plan’ from the date of the commencement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3ae28f77-0bf7-4920-8cc5-73f6e13fdff5" id="sec.990-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_2ce2ae3b-a135-4564-8a60-1ebc8ce1efd2" id="sec.990-ssec.3-def.jointinteractionmanagementplanprovisions_"><txt break.before="1"><defterm guid="_69a54a80-a618-4c7a-9cd2-e3f718c4ef3f" id="sec.990-ssec.3-def.jointinteractionmanagementplanprovisions" type="definition">joint interaction management plan provisions</defterm> means chapter 9, part 4, division 5, subdivision 1, as inserted by the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-064" target.version.series="576be06b-64ae-4e68-a107-8630189f1cf2" type="act"><name emphasis="yes">Water Reform and Other Legislation Amendment Act 2014</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_aae3fbdc-3afb-4a78-bd1e-644b26eaa08f" id="sec.990-ssec.3-def.preamendedAct_"><txt break.before="1"><defterm guid="_9d1c3d76-9a86-431f-8af5-a6a8831aeef4" id="sec.990-ssec.3-def.preamendedAct" type="definition">pre-amended Act</defterm> means this Act as in force before the commencement.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_6efaebb1-5a46-435b-abb8-d85613fd1f54" id="sec.990A" provision.type="transitional" spent.amends="0"><no>990A </no><heading guid="_446bb614-0e0a-46ac-b137-2e2cb3542563" id="sec.990A-he">Requirement for joint interaction management plan by particular date</heading><subclause affected.by.uncommenced="0" guid="_a5d4836c-e3dc-457a-b2a9-b174f25b81bb" id="sec.990A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies in relation to an operating plant, area or activity mentioned in section 990(1) if, on 27 September 2017 and despite the <legref check="valid" jurisd="QLD" target.doc.id="sl-2016-0170" target.version.series="291d1a56-9825-40e8-9cc3-af3bb85f8e51" type="subordleg"><name emphasis="yes">Mineral and Energy Resources (Common Provisions) Transitional Regulation 2016</name></legref>, <legref check="invalid" jurisd="QLD" refid="sec.9" target.doc.id="sl-2016-0170" target.version.series="291d1a56-9825-40e8-9cc3-af3bb85f8e51" type="subordleg">section 9</legref>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_82ee62a7-cbc0-46f6-8912-6de394464dcb" id="sec.990A-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a joint interaction management plan has not been made under section 705B in relation to the operating plant, area or activity; and</txt></block></li><li guid="_663f204c-9544-4f21-a507-2cb608855d5e" id="sec.990A-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the reason a joint interaction management plan has not been made under section 705B is that arbitration of a dispute about the plan has been applied for under section 705B(3) or (4).</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_7460bafe-3a66-47b6-b8ef-888b796a7883" id="sec.990A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The principal hazard management plan applying in relation to the operating plant, area or activity is taken to be a joint interaction management plan for section 705B(1)(a).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_20ae7bc4-191a-4147-889a-400348bd6fbd" id="sec.990A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Subsection (2) applies until a joint interaction management plan is made under section 705B in relation to the operating plant, area or activity.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_17787014-904a-45fe-bd0c-5332d6e37f6f" id="sec.990A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_f593599a-627f-4732-b3c6-6326470beb9f" id="sec.990A-ssec.4-def.overlappingarea_"><txt break.before="1"><defterm guid="_c9f7bf61-5829-4971-ac89-642c2147816a" id="sec.990A-ssec.4-def.overlappingarea" type="definition">overlapping area</defterm> see section 705(a).</txt></definition><definition affected.by.uncommenced="0" guid="_bf76902e-0e49-4ce0-a326-cb1d85c97490" id="sec.990A-ssec.4-def.preamendedAct_"><txt break.before="1"><defterm guid="_afe1de48-b04b-45c0-aee1-ac12bb13c4f3" id="sec.990A-ssec.4-def.preamendedAct" type="definition">pre-amended Act</defterm> means this Act as in force before the commencement of section 990.</txt></definition><definition affected.by.uncommenced="0" guid="_900db15b-5110-42fc-b111-9e2a4eab3f92" id="sec.990A-ssec.4-def.principalhazardmanagementplan_"><txt break.before="1"><defterm guid="_230a30e5-b109-441b-8f03-b6f362aad2a8" id="sec.990A-ssec.4-def.principalhazardmanagementplan" type="definition">principal hazard management plan</defterm>, applying in relation to an operating plant, area or activity, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_330b99bd-3a8a-44de-b9f5-ee999c0c3177" id="sec.990A-ssec.4-def.principalhazardmanagementplan-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if a principal hazard management plan applying in relation to the operating plant, area or activity has been made under the pre-amended Act, section 705A—the principal hazard management plan; or</txt></block></li><li guid="_a10c1deb-bf6b-490b-8640-1209ec6afbad" id="sec.990A-ssec.4-def.principalhazardmanagementplan-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—the part of the safety management system under this Act applying in relation to the operating plant, area or activity that deals with hazards and risks relating to carrying out activities in an overlapping area.</txt></block></li></list></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_7f3a2c85-8209-4a41-9e36-ab3e9b0bdf76" id="sec.991" provision.type="transitional" spent.amends="0"><no>991</no><heading guid="_4146080b-2d5d-4d47-ad89-30f6036cc6fe" id="sec.991-he">Return of seized things</heading><subclause affected.by.uncommenced="0" guid="_1c1b5b4b-a25e-4367-9eee-b2f1c4946b67" id="sec.991-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">New section 772 applies in relation to a thing seized under chapter 10, part 1 before the commencement that, on the commencement, is still seized.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_334da124-58f7-42fc-9e72-3ff6ce133bf4" id="sec.991-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If, at any time before the commencement, a thing seized under chapter 10, part 1 was not returned to its owner within the time required under old section 772—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1a26319c-f85e-4a8d-a269-7d7103b734f8" id="sec.991-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the retention of the thing is taken to have been as lawful as it would have been apart from the non-compliance with old section 772; and</txt></block></li><li guid="_cd3a4ae8-67ea-4a3e-8725-cfea110bad5e" id="sec.991-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the State is not liable to pay compensation, and does not incur any other liability, for the retention of the thing in contravention of old section 772.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_a2645fc5-2d99-467b-98d9-7eaaf980dc34" id="sec.991-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Subsection (2) applies for all purposes including a legal proceeding started before the commencement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7bed7355-2850-4a79-a115-5f4f7231ab89" id="sec.991-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_975e3382-cc51-4335-b454-534a54695352" id="sec.991-ssec.4-def.newsection772_"><txt break.before="1"><defterm guid="_c2865575-0b16-4311-8ce5-11e6338214b7" id="sec.991-ssec.4-def.newsection772" type="definition">new section 772</defterm> means section 772 as in force from the commencement.</txt></definition><definition affected.by.uncommenced="0" guid="_c630a15c-d016-4bb6-9e81-4c5fff6e3f59" id="sec.991-ssec.4-def.oldsection772_"><txt break.before="1"><defterm guid="_430475ef-aff2-4fc3-9ab7-13bbc8b08088" id="sec.991-ssec.4-def.oldsection772" type="definition">old section 772</defterm> means section 772 as in force from time to time before the commencement.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_48d60bab-98f2-4e84-999e-80f1d102aa36" id="sec.991A" provision.type="other" spent.amends="0"><no>991A </no><heading guid="_56189fad-5a87-49c8-b79d-7f0db0876630" id="sec.991A-he">Validation of particular orders for costs</heading><subclause affected.by.uncommenced="0" guid="_44b12609-3b41-4650-9930-0b898ddb5bdc" id="sec.991A-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to a costs order purportedly made by an Industrial Magistrates Court before 5 December 2014 in relation to a proceeding for an offence against this Act.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ed7ff072-92ad-469d-83cf-b7058417c43d" id="sec.991A-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The making of the costs order is, and is taken to always have been, as valid as it would have been if amended section 837 had been in effect from 31 December 2004.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7710cbb8-ed37-4b15-9afc-282f06f306ff" id="sec.991A-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Anything done under the costs order is, and is taken to always have been, as valid as it would have been if amended section 837 had been in effect from 31 December 2004.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_855a1ae4-ad94-4847-a902-081e883b2e26" id="sec.991A-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Subsections (2) and (3) have effect despite section 837(3) and the repealed <legref check="unknown" jurisd="QLD" type="act"><name emphasis="yes">Industrial Relations Act 1999</name></legref>, section 319(3), as those provisions were in force from time to time before 5 December 2014.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_1c499c07-e2a4-4eea-b63d-048fc96ad3d6" id="sec.991A-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_e734e3fc-7d6e-44d5-9f58-811b2cbde815" id="sec.991A-ssec.5-def.amendedsection837_"><txt break.before="1"><defterm guid="_1cc9e128-4c43-486a-9aa1-9526d66551bc" id="sec.991A-ssec.5-def.amendedsection837" type="definition">amended section 837</defterm> means section 837 as amended by the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="yes">Water Reform and Other Legislation Amendment Act 2014</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_0062d03d-c2a3-4507-a921-bb6b6a356e34" id="sec.991A-ssec.5-def.costsorder_"><txt break.before="1"><defterm guid="_35c1a69b-8201-442a-8271-5798da6d7d3f" id="sec.991A-ssec.5-def.costsorder" type="definition">costs order</defterm> means an order awarding a represented party for a proceeding costs of the representation.</txt></definition><definition affected.by.uncommenced="0" guid="_ad227cc0-f68b-4354-84dd-220ffc1676ca" id="sec.991A-ssec.5-def.IndustrialMagistratesCourt_"><txt break.before="1"><defterm guid="_2ed2749b-eed3-4fa1-be5d-31a4bce93bfe" id="sec.991A-ssec.5-def.IndustrialMagistratesCourt" type="definition">Industrial Magistrates Court</defterm> means an Industrial Magistrates Court under the repealed <legref check="unknown" jurisd="QLD" type="act"><name emphasis="yes">Industrial Relations Act 1999</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_4ee47a27-208f-4e49-a72a-fc153b60654b" id="sec.991A-ssec.5-def.representedparty_"><txt break.before="1"><defterm guid="_5bf309bc-0d54-4ea8-ab8c-17ffee94ad95" id="sec.991A-ssec.5-def.representedparty" type="definition">represented party</defterm>, for a proceeding, means a party to the proceeding, or a person ordered or permitted to appear or to be represented by a lawyer, who is represented by a lawyer.</txt></definition></deflist></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_4da34556-9b73-4d5e-aca9-0f24a42fe116" id="ch.15-pt.20"><no>Part 20</no><heading guid="_32ec1e43-fbc2-42d5-9799-0753b46cdaf2" id="ch.15-pt.20-he">Validation provision for <legref check="valid" jurisd="QLD" target.doc.id="act-2017-010" target.version.series="52ab5cae-1822-4c08-ad42-4db13a252690" type="act"><name emphasis="no">Land and Other Legislation Amendment Act 2017</name></legref></heading><clause affected.by.uncommenced="0" guid="_0f92cf9e-105f-421f-b2f7-d546eae179b3" id="sec.992" provision.type="transitional" spent.amends="0"><no>992</no><heading guid="_7cc1e22f-7968-4f60-b694-61aea02fb5d9" id="sec.992-he">Validation of particular appointments</heading><subclause affected.by.uncommenced="0" guid="_af9329b2-4bec-4094-a751-2514856d2612" id="sec.992-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, before the commencement, a public service officer was purportedly appointed to any of the following offices (each a <defterm guid="_458e17c2-6cb7-4183-b26b-1f064b3bd363" id="sec.992-def.relevantoffice" type="definition">relevant office</defterm>)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4ad05b45-fd07-4d20-ad32-8ef42593cb6e" id="sec.992-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the chief inspector, petroleum and gas under section 735(1)(a);</txt></block></li><li guid="_3cea3f74-d2fa-48e7-bdd3-1ad7fe7e494f" id="sec.992-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the deputy chief inspector, petroleum and gas under section 735(1)(b);</txt></block></li><li guid="_ddbdf657-75c6-4e65-8a6e-a12d56b808cb" id="sec.992-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">an inspector, petroleum and gas under section 735(1)(c);</txt></block></li><li guid="_3d0ab189-9473-4149-960c-c162087032a6" id="sec.992-ssec.1-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">an authorised officer under section 735(1)(d).</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ea527404-a458-4712-a3d2-b8f5fe3930ae" id="sec.992-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The person is declared to always have been validly appointed to the relevant office. </txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7b505a07-d32a-4e38-bd60-18c484fe0ece" id="sec.992-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Anything done or omitted to be done by the person that would have been valid and lawful under this Act had the person been validly appointed to the relevant office is taken to be, and always to have been, valid and lawful.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_2e60a4d7-b916-40e5-b4b3-fb52e96f8150" id="sec.992-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">Without limiting subsection (3), it is declared that evidence obtained by the person in the purported exercise of a power under this Act is taken to be, and always to have been, lawfully obtained.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_fd553565-79d6-456e-9dc4-e497c5c4de64" id="ch.15-pt.21"><no>Part 21</no><heading guid="_2b1829cb-0179-4dad-b8a7-fe043fe6cc83" id="ch.15-pt.21-he">Transitional provisions for <legref check="valid" jurisd="QLD" target.doc.id="act-2018-024" target.version.series="b031d369-63a0-4cb8-91d7-3897383857ca" type="act"><name emphasis="no">Mineral, Water and Other Legislation Amendment Act 2018</name></legref></heading><clause affected.by.uncommenced="0" guid="_bd0e4643-d6d4-494e-bbce-9ca2ab72b8a9" id="sec.993" provision.type="transitional" spent.amends="0"><no>993</no><heading guid="_23131aad-b0ba-4f38-8761-1b8afbf3fc51" id="sec.993-he">Requirement for joint interaction management plan relating to overlapping authority to prospect, petroleum lease, or water monitoring authority, under <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref></heading><subclause affected.by.uncommenced="0" guid="_60fa0f97-f6b2-42dd-8ca4-32b6286b3d82" id="sec.993-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies in relation to an operating plant to which chapter 9, part 4, division 5, subdivision 1 applies under section 705 if a petroleum authority relating to the operating plant is an authority to prospect, petroleum lease, or water monitoring authority, under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_78a34212-c246-4d89-9305-5408e924c250" id="sec.993-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The principal hazard management plan applying in relation to the operating plant is taken to be a joint interaction management plan for the purposes of section 705B(1)(a).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_e6a752ec-2208-42a5-ac4b-db6bde72635f" id="sec.993-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">Subsection (2) applies until a joint interaction management plan is made under section 705B in relation to the operating plant.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d7e84b9d-78cd-4176-9609-4461ce9137e5" id="sec.993-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">The operator of an authorised activities operating plant responsible for making a joint interaction management plan under section 705B must—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1478e6b4-a739-4db7-9ab9-c21f9604e614" id="sec.993-ssec.4-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">make reasonable attempts to consult with the site senior executive, as mentioned in section 705B(1)(b)(i), within 2 months after the commencement; and</txt></block></li><li guid="_be86e14b-0ab4-4d9e-b780-66647ae862bc" id="sec.993-ssec.4-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the operator seeks to rely on section 705B(2)—give the site senior executive a copy of the proposed plan, as mentioned in that subsection, within 2 months after the commencement.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_38f268a8-d290-46c8-9865-0f9c6cce8e65" id="sec.993-ssec.5" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_ba035210-3bb8-433f-b29f-177af28d2931" id="sec.993-ssec.5-def.principalhazardmanagementplan_"><txt break.before="1"><defterm guid="_ffc5a642-04d7-408f-b084-7eac16fcaf65" id="sec.993-ssec.5-def.principalhazardmanagementplan" type="definition">principal hazard management plan</defterm>, applying in relation to an operating plant, means the part of the safety management system applying in relation to the operating plant that deals with hazards and risks relating to carrying out activities in an overlapping area.</txt></definition></deflist></block></subclause></clause><clause affected.by.uncommenced="0" guid="_c7d52d6f-994a-4f97-bb67-2e1bd6ecf22e" id="sec.994" provision.type="transitional" spent.amends="0"><no>994</no><heading guid="_1f005cb3-1fc2-4c60-97ea-7c10db8e4efc" id="sec.994-he">Existing condition of petroleum lease no longer applies</heading><subclause affected.by.uncommenced="0" guid="_56dc8f6e-57ea-4b03-94c0-cbaabf51725f" id="sec.994-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a condition of a petroleum lease requires the holder to give the chief executive a report detailing infrastructure for the lease. </txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b745bd8e-b43c-475c-bc61-ee36cbb8a9ba" id="sec.994-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">On the commencement, the condition is no longer a condition of the lease.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_efb72b8b-d6fd-4bd9-95ff-5f575fea79d4" id="sec.995" provision.type="transitional" spent.amends="0"><no>995</no><heading guid="_8ac45658-9b41-4c43-a878-721a2b967526" id="sec.995-he">Determining period for exemption for production testing—s 591A</heading><subclause affected.by.uncommenced="0" guid="_ca508329-b72f-49bd-a1d1-1ae3a7d61705" id="sec.995-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to petroleum mentioned in section 591A(2) that is produced before the commencement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_841a8b9d-df30-4554-ae87-3dbe16c1f553" id="sec.995-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">For section 591A(3)(a), the sum of all periods after 31 December 2004 for the petroleum must include the periods for which, under former section 73(2) or former section 152(2), production testing was authorised to be carried out in relation to the petroleum.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_ce572cb8-55fe-4fb9-9260-31297bcf49d6" id="sec.995-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition affected.by.uncommenced="0" guid="_d19c5f7a-69da-4b17-a384-26cb01d978d7" id="sec.995-ssec.3-def.former_"><txt break.before="1"><defterm guid="_07345641-62e4-489e-b580-92adee70a8fc" id="sec.995-ssec.3-def.former" type="definition">former</defterm>, in relation to a provision, means the provision as in force from time to time before its omission under the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>.</txt></definition></deflist></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_1e486d2d-ea4c-48dd-a237-ce5a48fa7950" id="ch.15-pt.22"><no>Part 22</no><heading guid="_b86e604a-24a2-4ced-b23f-6b26bf655c39" id="ch.15-pt.22-he">Transitional provisions for <legref check="valid" jurisd="QLD" target.doc.id="act-2019-007" target.version.series="a86b1a7b-a613-447d-b5bf-c1aafd954c6c" type="act"><name emphasis="no">Land, Explosives and Other Legislation Amendment Act 2019</name></legref></heading><clause affected.by.uncommenced="0" guid="_d79d857f-a0cd-4d90-bcee-300a716347d1" id="sec.996" provision.type="transitional" spent.amends="0"><no>996</no><heading guid="_ffdd7938-05ed-4ee5-92a0-2a1aea660b51" id="sec.996-he">Definition for part</heading><block><txt break.before="1">In this part—</txt><deflist><definition affected.by.uncommenced="0" guid="_55606bd7-a48b-4e81-aae9-9cb1903b8801" id="sec.996-def.former_"><txt break.before="1"><defterm guid="_5f71381d-7dc5-4418-be06-65ffe41ccaf1" id="sec.996-def.former" type="definition">former</defterm>, for a provision of this Act, means as in force before the commencement of the section in which the term is used.</txt></definition></deflist></block></clause><clause affected.by.uncommenced="0" guid="_8b8ee8c0-48c8-4153-8a38-a08c8d80bd6a" id="sec.997" provision.type="transitional" spent.amends="0"><no>997</no><heading guid="_94e372ef-d666-4feb-86d1-416a3fd895ed" id="sec.997-he">Offence proceedings</heading><subclause affected.by.uncommenced="0" guid="_39b909d0-9a51-4653-87e4-0cc8944909ea" id="sec.997-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, for a proceeding for an offence against this Act, an act or omission to which the proceeding relates was done or omitted to be done before the commencement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_b0c4ebb2-20ef-48bd-8fbe-1dc57d98a365" id="sec.997-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Former sections 837 and 840 apply to the proceeding.</txt></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_5fb7887b-1d20-4ce9-8128-fe35b391e5b2" id="sec.998" provision.type="other" spent.amends="0"><no>998</no><heading guid="_c6c2570f-f37a-4c70-b640-54578b9a9e6b" id="sec.998-he">Existing approvals</heading><subclause affected.by.uncommenced="0" guid="_ee0e03b9-251f-41cc-80bb-4bad49c54a67" id="sec.998-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5bc7f063-38eb-40e5-8b1e-880b1d3c33b6" id="sec.998-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before the commencement, a person or body approved a gas device or gas fitting under former section 733(1)(a)(ii); and</txt></block></li><li guid="_f84b96cd-910f-42fa-9b70-54373d9752c9" id="sec.998-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">immediately before the commencement, the approval had not been cancelled or suspended.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_2316f3e1-5063-4132-8b8b-c1266edbbd9e" id="sec.998-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The approval is taken to have been given by the holder of a gas device approval authority.</txt></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_b57aef1a-eeec-4428-85e6-8e1a8d08a41b" id="sec.999" provision.type="other" spent.amends="0"><no>999</no><heading guid="_a7dc9c27-497b-4698-98fd-29f045209c0e" id="sec.999-he">Persons or bodies approved by the chief inspector</heading><subclause affected.by.uncommenced="0" guid="_0bff88ef-a366-443c-a4bc-a39f3ee80d89" id="sec.999-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_16c0abc9-75ee-4929-ac3b-d0a0ab22ecdb" id="sec.999-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">before the commencement, the chief inspector approved a person or body under former section 733(1)(a) for a particular type of gas device; and</txt></block></li><li guid="_1725e6e1-8835-4d13-bf2b-a84beea46fbf" id="sec.999-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">immediately before the commencement, the approval had not been cancelled or suspended.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_9220c6e5-628e-4ebf-9677-4e55e456a4b2" id="sec.999-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The approval is taken to be a gas device approval authority until 1 year after the commencement.</txt></block></subclause></clause><clause affected.by.uncommenced="0" change="ins" guid="_16747400-d0c2-4b92-8aaa-96e66dfa43a6" id="sec.1000" provision.type="other" spent.amends="0"><no>1000 </no><heading guid="_53811d63-4591-4444-8201-14ab105bd8d4" id="sec.1000-he">Fuel gas delivery networks </heading><subclause affected.by.uncommenced="0" guid="_99042f61-44c9-4a0c-ab9e-00e3a070b9b0" id="sec.1000-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8f28d694-4f76-4b6c-9ecc-a789280ed03f" id="sec.1000-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">immediately before the commencement—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_80062550-10cd-457a-b0ef-69479ed44b45" id="sec.1000-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a supply of fuel gas to or in a container owned or provided by a person was not an LPG delivery network under this Act as in force before the commencement; and</txt></block></li><li guid="_fa2ac885-7df6-468e-b85a-63a23f2da281" id="sec.1000-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the place in which the supply was carried out was not an operating plant; and</txt></block></li></list></block></li><li guid="_a5ad60d0-3656-4beb-8e30-a2f8cb70b24f" id="sec.1000-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">on the commencement, the supply of fuel gas by the person is a fuel gas delivery network.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_ba9d2c44-9639-4157-95ac-1d2b7a14a169" id="sec.1000-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Section 670(5) does not apply to the supply of fuel gas by the person until 3 months after the commencement.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_b3bf4d92-44e4-4df4-a44e-457c14f66d47" id="ch.15-pt.23"><no>Part 23</no><heading guid="_0c3f2cbb-7d31-48ef-9e0d-4397cca5be1f" id="ch.15-pt.23-he">Transitional provision for <legref check="valid" jurisd="QLD" target.doc.id="act-2018-012" target.version.series="ccfc7d58-d155-4d28-a74b-42bfa616d6a8" type="act"><name emphasis="no">Revenue Legislation Amendment Act 2018</name></legref></heading><clause affected.by.uncommenced="0" guid="_472fbde8-1c89-4657-9a2c-626ac2116824" id="sec.1001" provision.type="transitional" spent.amends="0"><no>1001 </no><heading guid="_2e54a35b-6380-4c7f-b81b-c816e7cb0f80" id="sec.1001-he">Validity of determinations of petroleum royalty made before 1 July 2014</heading><subclause affected.by.uncommenced="0" guid="_7691d8f4-103e-4ad5-a34a-e3b3de3c34ff" id="sec.1001-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to a determination of petroleum royalty purportedly made by the Minister under this Act as in force before 1 July 2014.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_0b3743e0-a151-458e-a8c2-7b6c18e3e62a" id="sec.1001-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The determination is taken to have been validly made.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" change="ins" guid="_f71ed2c9-adcc-435e-b843-f24cac058b2d" id="ch.15-pt.24"><no>Part 24</no><heading guid="_5219898f-528a-433d-85eb-35fb6eade831" id="ch.15-pt.24-he">Transitional provisions for <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Natural Resources and Other Legislation Amendment Act 2019</name></legref></heading><clause affected.by.uncommenced="0" guid="_17347d68-6ccf-4cf3-a11d-fbadbeba7d67" id="sec.1002" provision.type="transitional" spent.amends="0"><no>1002 </no><heading guid="_c798cf8e-4cf7-44af-b44a-e5dac4558112" id="sec.1002-he">Definition for part</heading><block><txt break.before="1">In this part—</txt><deflist><definition affected.by.uncommenced="0" guid="_170d8eb6-d6bf-4ef6-96fd-c0902327d8ea" id="sec.1002-def.new_"><txt break.before="1"><defterm guid="_aaf24dd7-7ec7-4c27-8658-ff51ff3b255a" id="sec.1002-def.new" type="definition">new</defterm>, for a provision, means as in force from the commencement.</txt></definition></deflist></block></clause><clause affected.by.uncommenced="0" guid="_e477c0db-c3ee-4d5f-9cb9-f9c9bba2a7a4" id="sec.1003" provision.type="transitional" spent.amends="0"><no>1003 </no><heading guid="_3af95950-9e43-4205-9264-88f76e031c17" id="sec.1003-he">Power to impose, vary or remove condition of authority to prospect</heading><block><txt break.before="0">The power under new section 42A to impose a condition on, or vary or remove a condition of, an authority to prospect applies to an authority to prospect whether it was granted before or after the commencement. </txt></block></clause><clause affected.by.uncommenced="0" guid="_2d9e72ef-0e02-41be-92d2-447d125305c3" id="sec.1004" provision.type="transitional" spent.amends="0"><no>1004 </no><heading guid="_bbc0aa40-d506-4f43-960a-4d155a2346a5" id="sec.1004-he">Relinquishment requirements</heading><block><txt break.before="0">The requirement under new section 66(2) for the holder of an authority to prospect to relinquish 50% of the original notional sub-blocks of the authority by the end of the relinquishment day applies only if the authority was granted after the commencement. </txt></block></clause><clause affected.by.uncommenced="0" guid="_216ee3d8-eca1-468a-8174-7eb5e018570e" id="sec.1005" provision.type="transitional" spent.amends="0"><no>1005 </no><heading guid="_b08f5d98-c8c5-4f41-9f95-d99b91427ddb" id="sec.1005-he">Existing applications for renewal of authority to prospect</heading><subclause affected.by.uncommenced="0" guid="_9d13695d-9bd4-4c24-882f-4a37c2eeae87" id="sec.1005-ssec.1" provision.type="transitional"><no>(1)</no><block><txt break.before="0">This section applies to an application under section 82 for renewal of an authority to prospect made, but not decided, before the commencement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d58859fd-225c-40d7-a1bc-44b4e5f55965" id="sec.1005-ssec.2" provision.type="transitional"><no>(2)</no><block><txt break.before="0">If the application does not include all of the information required under new section 45 for a proposed later work program for the renewed authority, the applicant may, within 3 months after the commencement, give the chief executive the information not included. </txt></block></subclause><subclause affected.by.uncommenced="0" guid="_35a07513-6c09-49e2-887c-ae59e06e3faa" id="sec.1005-ssec.3" provision.type="transitional"><no>(3)</no><block><txt break.before="0">The proposed later work program provided by the applicant under section 82(1)(d), and any additional information provided by the applicant under subsection (2), is taken to be a proposed later work program for the renewed authority to prospect for new section 84. </txt></block></subclause><subclause affected.by.uncommenced="0" guid="_3a8f2ab4-b221-4968-bb26-b2137a74b0d9" id="sec.1005-ssec.4" provision.type="transitional"><no>(4)</no><block><txt break.before="0">New section 84 applies in relation to the application whether or not the applicant provides information under subsection (2).</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_8bf87062-3b7b-4926-994b-c0e2a7e3737b" id="sec.1005-ssec.5" provision.type="transitional"><no>(5)</no><block><txt break.before="0">To remove any doubt, it is declared that, if the applicant does not provide information under subsection (2), the Minister must decide, under new section 84, whether to approve the proposed later work program provided by the applicant under section 82(1)(d) as the later work program for the renewed authority to prospect.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" guid="_dd95729c-1ae0-446f-9a19-8c116a3d47ae" id="ch.15-pt.25"><no>Part 25</no><heading guid="_1c390a07-6684-487c-bdc0-1e79e181d5a9" id="ch.15-pt.25-he">Transitional and validation provisions for <legref check="valid" jurisd="QLD" target.doc.id="act-2019-020" target.version.series="0664e4e9-dd5a-4aeb-a5ac-b5870faaaa50" type="act"><name emphasis="no">Revenue and Other Legislation Amendment Act 2019</name></legref></heading><clause affected.by.uncommenced="0" guid="_a5c5b68e-25f6-419a-b0ec-d8c2342fb023" id="sec.1006" provision.type="transitional" spent.amends="0"><no>1006</no><heading guid="_4345d426-df1a-4587-82dc-c74de7b4cdde" id="sec.1006-he">Rate of petroleum royalty payable for annual return period ending 31 December 2019</heading><subclause affected.by.uncommenced="0" guid="_f2f48243-315c-463f-ab66-5f13ad88b0cb" id="sec.1006-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to a petroleum producer in relation to an annual royalty return for the annual return period ending 31 December 2019.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_a025b868-8adf-47ce-a7eb-0f1ddbea18de" id="sec.1006-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">Despite section 590(2), petroleum royalty is payable by the petroleum producer for the annual return period at the rate of 11.25% of the wellhead value of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b0bced71-9fa9-4196-8174-d3eb3d3f2e64" id="sec.1006-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for petroleum produced under a petroleum tenure or a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> petroleum tenure—petroleum disposed of by the petroleum producer during the period; or</txt></block></li><li guid="_31b15408-52e1-40b1-92a0-d05e72a55db9" id="sec.1006-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—petroleum produced by the petroleum producer during the period.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_5509e89c-4a34-4727-95f8-fb66fc0e3457" id="sec.1006-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">To remove any doubt, it is declared that the rate stated in subsection (2)—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8e118896-2953-48f7-accf-59ce504dba78" id="sec.1006-ssec.3-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">applies for the entire annual return period; and</txt></block></li><li guid="_f7b5514c-9e81-4bdd-8da0-f9736f0041f5" id="sec.1006-ssec.3-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">does not prevent a different rate—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_db546c3a-294a-45bf-8db9-ec85f26e50ab" id="sec.1006-ssec.3-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">being, or having been, prescribed under section 590(2); and</txt></block></li><li guid="_013cbc6a-1b5f-49db-b084-a011fa889c80" id="sec.1006-ssec.3-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">applying to the petroleum producer for a royalty return period occurring during the annual return period.</txt></block></li></list></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d57a4dc3-43aa-489c-a31b-070a55cc813b" id="sec.1006-ssec.4" provision.type="other"><no>(4)</no><block><txt break.before="0">This section does not apply in relation to a transitional return, made under <legref check="invalid" jurisd="QLD" refid="sec.599" type="act">section 599</legref><legref check="invalid" jurisd="QLD" refid="sec.599-ssec.8" type="act">(8)</legref> of the <legref check="invalid" jurisd="QLD" type="act"><name emphasis="no">Act</name></legref>, for the transitional return period ending 31 December 2019.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_d4f1b79d-b194-4bf3-8418-9d6ccb178681" id="sec.1007" provision.type="transitional" spent.amends="0"><no>1007</no><heading guid="_da036157-b2d0-45e6-8fa6-4954ef762b58" id="sec.1007-he">Giving of documents by Minister under royalty provisions before commencement</heading><block><txt break.before="1">A document purportedly given to a person by the Minister under a royalty provision before the commencement is taken to have been validly given, whether or not a requirement about the giving of the document under this Act as in force before the commencement was complied with. </txt></block></clause></part><part affected.by.uncommenced="0" change="ins" guid="_c2133b4d-156f-4798-b067-6a23b765e28e" id="ch.15-pt.26"><no>Part 26</no><heading guid="_e132c210-b80b-4148-a658-d68e6fdb3ce1" id="ch.15-pt.26-he">Transitional provisions for <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Resources Safety and Health Queensland Act 2019</name></legref></heading><clause affected.by.uncommenced="0" guid="_5e95a6a3-a778-4322-89ca-402613dc7b79" id="sec.1008" provision.type="other" spent.amends="0"><no>1008 </no><heading guid="_c63766cf-aed1-44ce-8d94-07cd2a621251" id="sec.1008-he">Definitions for part</heading><block><txt break.before="1">In this part—</txt><definition affected.by.uncommenced="0" guid="_57593835-8488-4fa0-9751-7ab1f813b2e6" id="sec.1008-def.correspondingprovision_"><txt break.before="1"><defterm guid="_e3f17c6e-e75d-4261-9196-eda440491140" id="sec.1008-def.correspondingprovision" type="definition">corresponding provision</defterm>, for a provision of the pre-amended Act, means a provision of this Act that provides for the same, or substantially the same, matter as the provision of the pre-amended Act.</txt></definition><definition affected.by.uncommenced="0" guid="_fb83068f-5ada-4376-b971-13fa97aa0585" id="sec.1008-def.preamendedAct_"><txt break.before="1"><defterm guid="_0751d504-8185-4bc5-bce9-0a68845d07d8" id="sec.1008-def.preamendedAct" type="definition">pre-amended Act</defterm> means this Act as in force before the commencement.</txt></definition></block></clause><clause affected.by.uncommenced="0" guid="_dd529317-cdea-4ece-bc7d-fe1d89b5d9ac" id="sec.1009" provision.type="other" spent.amends="0"><no>1009 </no><heading guid="_1334847f-12fe-4820-ad92-db6adbc61d50" id="sec.1009-he">Functions performed and powers exercised by chief executive </heading><block><txt break.before="1">A function performed, or power exercised, by the chief executive under a provision of the pre-amended Act, if the context permits, is taken to have been performed, or exercised, by the CEO under the corresponding provision.</txt></block></clause><clause affected.by.uncommenced="0" guid="_78ea95db-dbfc-4ddc-a103-c4389b41a714" id="sec.1010" provision.type="other" spent.amends="0"><no>1010 </no><heading guid="_e902f82c-2536-4c44-b6a8-02871a765e7f" id="sec.1010-he">References to chief executive</heading><subclause affected.by.uncommenced="0" guid="_65c6e1a3-f7bf-48ce-a6b8-df8e4c3705f6" id="sec.1010-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_48d49a83-ccd8-48d2-83d5-c5f2b40ac25e" id="sec.1010-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a provision of the pre-amended Act mentioned the chief executive; and</txt></block></li><li guid="_b5fbf17b-719a-47b5-b472-839096be7e88" id="sec.1010-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a corresponding provision mentions the CEO.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_f1a7b8da-348b-49cf-b563-918b46d8d61e" id="sec.1010-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In a document made under or relating to the provision of the pre-amended Act, if the context permits, a reference to the chief executive is taken to be a reference to the CEO.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_5712074b-a590-4c37-b885-bc5f10f76010" id="sec.1011" provision.type="other" spent.amends="0"><no>1011 </no><heading guid="_92665c67-a96b-4b86-ae79-21b3fa9918bb" id="sec.1011-he">Existing proceedings</heading><subclause affected.by.uncommenced="0" guid="_cc690d86-9d80-48a1-9780-b26e1454a79c" id="sec.1011-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the following proceedings started before the commencement—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a20ebd13-5c9d-45c3-9eb3-53af8235a562" id="sec.1011-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a proceeding for an offence against this Act started by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_06105595-66c1-4f7b-abd7-71ea482e834d" id="sec.1011-ssec.1-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the Commissioner for Mine Safety and Health; or</txt></block></li><li guid="_2fd67f36-a41d-4a44-b149-e0db36bab947" id="sec.1011-ssec.1-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the chief executive or another appropriately qualified person with the written authorisation of the chief executive;</txt></block></li></list></block></li><li guid="_5292f85d-38cc-4602-b3c9-c67e847433c9" id="sec.1011-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a proceeding for an injunction, interim injunction, or to rescind or vary an injunction, under the pre-amended Act, started by the Commissioner for Mine Safety and Health;</txt></block></li><li guid="_6e9d81aa-0839-4067-a436-f02fa8b8186b" id="sec.1011-ssec.1-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">an appeal against a decision made on a proceeding mentioned in paragraph (a) or (b).</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_c46900b2-13ba-47d3-aebe-c9dfb27b37c8" id="sec.1011-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">If, immediately before the commencement, the proceeding had not been finally dealt with, on the commencement—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6d881bd4-391c-4b97-8e51-55566d2c4dec" id="sec.1011-ssec.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the proceeding was brought by the Commissioner for Mine Safety and Health and is in relation to a serious offence within the meaning of section 837(8)—the WHS prosecutor becomes a party to the proceeding in place of the commissioner; and</txt></block></li><li guid="_8a0f6e6b-b1ef-45b6-9d97-ec663fd6ca2a" id="sec.1011-ssec.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the proceeding is a proceeding other than a proceeding mentioned in paragraph (a)—the CEO becomes a party to the proceeding in place of the person who started the proceeding.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_4410be6d-999f-4fac-9af6-a7aed59fdc38" id="sec.1011-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">For a proceeding mentioned in subsection (2)(b), on the commencement or at any time after the commencement, the CEO may authorise in writing another appropriately qualified person, including, for example, the WHS prosecutor, to become a party to the proceeding in place of the CEO.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_2ec77cf3-5357-4d14-ac71-bc4acc3d44dd" id="sec.1012" provision.type="other" spent.amends="0"><no>1012 </no><heading guid="_50807abe-da50-466b-9df5-87623472b05c" id="sec.1012-he">References to department</heading><subclause affected.by.uncommenced="0" guid="_acceb25e-08b2-4739-ab88-808e72692928" id="sec.1012-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_88290864-1cfa-462a-82f9-d2a19107ab57" id="sec.1012-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a provision of the pre-amended Act mentioned the department; and</txt></block></li><li guid="_81cdd89b-a7a4-45e2-b6b3-536dd4037476" id="sec.1012-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a corresponding provision mentions RSHQ.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_d6b42ced-d1fd-4c81-8d36-f22a1d100399" id="sec.1012-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">In a document made under or relating to the provision of the pre-amended Act, if the context permits, a reference to the department is taken to be a reference to RSHQ.</txt></block></subclause></clause></part><part affected.by.uncommenced="0" change="ins" guid="_f72ee7e2-327a-4ca7-bf92-b20cf5e46fcd" id="ch.15-pt.27"><no>Part 27</no><heading guid="_92740238-cd59-4cd3-a29a-6895ecb847c4" id="ch.15-pt.27-he">Transitional provisions for <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Mineral and Energy Resources and Other Legislation Amendment Act 2020</name></legref></heading><clause affected.by.uncommenced="0" guid="_0b1c80d9-45ed-4deb-be2c-4ff7b0d91836" id="sec.1013" provision.type="transitional" spent.amends="0"><no>1013 </no><heading guid="_7d27fadd-f52d-4ec6-860b-08433d2e342e" id="sec.1013-he">Power to impose or amend condition if changed holder of particular petroleum authorities</heading><block><txt break.before="1">The power of the Minister to impose another condition on, or amend a condition of, a petroleum authority under section 80A, 160A, 424A or 455A applies—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9a99eff9-7a1f-42cd-8c7d-43bab0cbe72e" id="sec.1013-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">whether the authority was granted before or after the commencement; and </txt></block></li><li guid="_cce616bc-c750-4003-94ac-4fe3ecd125e6" id="sec.1013-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">only if the change mentioned in section 80A(1), 160A(1), 424A(1) or 455A(1) happens after the commencement.</txt></block></li></list></block></clause><clause affected.by.uncommenced="0" guid="_68ab4af7-529c-480b-902d-33d92d4f5aaf" id="sec.1014" provision.type="transitional" spent.amends="0"><no>1014 </no><heading guid="_51775cfe-fb34-4b85-bde8-a3bf39e7c349" id="sec.1014-he">Restriction on pipeline licence if there is an existing geothermal, GHG or mining lease</heading><block><txt break.before="1">Section 400 as in force after the commencement applies in relation to a pipeline licence whether the pipeline licence was granted before or after the commencement.</txt></block></clause><clause affected.by.uncommenced="0" guid="_302b4ad6-1118-46b8-ba95-e439f50974f7" id="sec.1015" provision.type="transitional" spent.amends="0"><no>1015 </no><heading guid="_d3aa7ac1-1237-4dc8-8f8b-28f149df7832" id="sec.1015-he">Restriction on petroleum facility licence if there is an existing mining lease</heading><block><txt break.before="1">Section 440 as in force after the commencement applies in relation to a petroleum facility licence whether the petroleum facility licence was granted before or after the commencement.</txt></block></clause><clause affected.by.uncommenced="0" guid="_0c5021a1-d267-4be3-85c7-554c64a8888c" id="sec.1016" provision.type="transitional" spent.amends="0"><no>1016 </no><heading guid="_636e5b0e-fa40-4bde-8251-dbe198e93d08" id="sec.1016-he">Conferences with eligible claimants or owners or occupiers started before commencement</heading><subclause affected.by.uncommenced="0" guid="_85c8ae34-eecd-465c-822d-923b53eda0e7" id="sec.1016-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_66fe826d-b0da-474c-830a-b2bb1dd4eac8" id="sec.1016-ssec.1-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an authorised officer asked parties to attend a conference under section 734C as in force before the commencement; and</txt></block></li><li guid="_93c5d668-7ad4-41b6-846b-a118069c7558" id="sec.1016-ssec.1-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">immediately before the commencement the conference had not taken place.</txt></block></li></list></block></subclause><subclause affected.by.uncommenced="0" guid="_3e31cd31-9f58-46ab-ae4a-74ee74e7cf43" id="sec.1016-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The conference must take place under chapter 10, part 1AA as in force immediately before the commencement.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_d4c566d0-e9a9-4ff3-ace3-99a86710f5cb" id="sec.1016-ssec.3" provision.type="other"><no>(3)</no><block><txt break.before="0">The Common Provisions Act, chapter 3, part 8 does not apply in relation to the conference.</txt></block></subclause></clause><clause affected.by.uncommenced="0" guid="_b8830146-be26-4391-8f17-cd5e71379ed6" id="sec.1017" provision.type="transitional" spent.amends="0"><no>1017 </no><heading guid="_0365faf4-40e0-44ea-8107-7504b6bc9cb6" id="sec.1017-he">Existing authority to carry out remediation activities</heading><subclause affected.by.uncommenced="0" guid="_d4b1b218-9c20-4ca6-b06b-62be44b679fb" id="sec.1017-ssec.1" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if, immediately before the commencement, a person was authorised by the chief executive under section 799D to carry out remediation activities in relation to an abandoned operating plant.</txt></block></subclause><subclause affected.by.uncommenced="0" guid="_7283ade3-19f2-4310-aa26-70f55840e507" id="sec.1017-ssec.2" provision.type="other"><no>(2)</no><block><txt break.before="0">The authorisation is taken to have been made under section 799D as in force on the commencement.</txt></block></subclause></clause></part></chapter></body></wrapper><schedules affected.by.uncommenced="0" numbering.style="manual"><schedule affected.by.uncommenced="0" guid="_7e30dc7a-6468-45ca-86c4-41e9b141965e" id="sch.1" numbering.style="manual" provision.type="other" spent.amends="0" type="schedule"><no>Schedule 1</no><heading guid="_716b8487-553e-4b46-a24c-da5368f37a4b" id="sch.1-he">Reviews and appeals</heading><sourceref affected.by.uncommenced="0" guid="_66bee4e4-c440-45ad-8f24-5754979a6c83" id="sch.1-ref"><intref check="valid" refid="sec.817" target.guid="_3bb240da-66d2-46c4-a13a-500a798a8340">sections 817</intref><intref check="valid" refid="sec.817-ssec.1" target.guid="_aa3ff2fa-d486-4675-a66d-45f8dd78750a">(1)</intref> and <intref check="valid" refid="sec.823" target.guid="_fd2e0354-d8f4-41c9-bf8c-6aef462df5e4">823</intref><intref check="valid" refid="sec.823-ssec.3" target.guid="_23548150-a4ee-4a1a-ba81-743ef5a501dc">(3)</intref> and <intref check="valid" refid="sec.823-ssec.4" target.guid="_591e661e-e89f-456d-a9a0-f36f767b9e47">(4)</intref></sourceref><block align="left"><table colsep="0" font.size="12.pt" frame="none" guid="_922f5d35-77cd-4dab-82a3-d0133032415c" heading.align="left" id="sch.1-tbl.1" orient="port" rowsep="0"><no>Table 1</no><heading guid="_d727b874-0754-45cf-a8e9-c505672de7b2" id="sch.1-tbl.1-he">Decisions subject to review</heading><tgroup cols="2" colsep="0" rowsep="0" tgroupstyle="2columnUnRuled"><colspec colname="1" colnum="1" colsep="0" colwidth="1.522in"/><colspec colname="2" colnum="2" colsep="0" colwidth="3.478in"/><thead><row guid="_d09d08d9-aada-4313-b4fb-6760f127c648" id="sch.1-tbl.1-tblh-tblr" rowsep="0"><entry align="left" colname="1" guid="_867802b4-c372-4679-9b43-01bf94de1992" id="sch.1-tbl.1-tblh-tblr-tble1" valign="top"><block><txt break.before="1">Section reference</txt></block></entry><entry align="left" colname="2" guid="_61c0c8dd-14e8-4636-adc0-55f3959518f0" id="sch.1-tbl.1-tblh-tblr-tble2" valign="top"><block><txt break.before="1">Description of decision</txt></block></entry></row></thead><tbody><row guid="_e9f89c81-b30a-4320-849a-d9dd160cd610" id="sch.1-tbl.1-tblr" rowsep="0"><entry align="left" colname="1" guid="_83e6eb97-5ac8-4740-b2af-14943460ea98" id="sch.1-tbl.1-tblr-tble1" valign="top"><block><txt break.before="1">71A</txt></block></entry><entry align="left" colname="2" guid="_974b5f24-f650-4bca-b83a-e29465ca3c7e" id="sch.1-tbl.1-tblr-tble2" valign="top"><block><txt break.before="1">Decision not to approve further ATP production testing</txt></block></entry></row><row guid="_277306d9-5605-4518-bec6-f7bd594891aa" id="sch.1-tbl.1-tblr-oc.2" rowsep="0"><entry align="left" colname="1" guid="_e0c86e64-0a54-4a79-abd2-ffc6b85e0858" id="sch.1-tbl.1-tblr-oc.2-tble1" valign="top"><block><txt break.before="1">71B</txt></block></entry><entry align="left" colname="2" guid="_dab26cee-0895-4e8e-a1df-b546f133512d" id="sch.1-tbl.1-tblr-oc.2-tble2" valign="top"><block><txt break.before="1">Decision not to approve further ATP storage testing</txt></block></entry></row><row guid="_60d01cd1-413f-4bbe-9fe8-41cc95467af3" id="sch.1-tbl.1-tblr-oc.3" rowsep="0"><entry align="left" colname="1" guid="_20525c3b-bdef-4b80-8bb4-06e5e12c3206" id="sch.1-tbl.1-tblr-oc.3-tble1" valign="top"><block><txt break.before="1">150A</txt></block></entry><entry align="left" colname="2" guid="_08fededf-921f-4593-a578-db9e37b9d0c7" id="sch.1-tbl.1-tblr-oc.3-tble2" valign="top"><block><txt break.before="1">Decision not to approve further PL production testing</txt></block></entry></row><row guid="_45ef46f3-4f99-453a-8669-858f6f86c3a2" id="sch.1-tbl.1-tblr-oc.4" rowsep="0"><entry align="left" colname="1" guid="_990ed94b-bdaa-4fc2-81de-978baf3ad668" id="sch.1-tbl.1-tblr-oc.4-tble1" valign="top"><block><txt break.before="1">150C</txt></block></entry><entry align="left" colname="2" guid="_e450f86e-d6c1-48f0-ad0f-7196e7395a45" id="sch.1-tbl.1-tblr-oc.4-tble2" valign="top"><block><txt break.before="1">Decision not to approve further PL storage testing</txt></block></entry></row><row guid="_cd19f12a-4586-4eb5-a21d-26ac8d33e0b6" id="sch.1-tbl.1-tblr-oc.5" rowsep="0"><entry align="left" colname="1" guid="_bc57a664-22a2-491e-a461-708c60a33474" id="sch.1-tbl.1-tblr-oc.5-tble1" valign="top"><block><txt break.before="1">175G(3)</txt></block></entry><entry align="left" colname="2" guid="_d09ae7cc-b352-42a9-9939-d63427faa768" id="sch.1-tbl.1-tblr-oc.5-tble2" valign="top"><block><txt break.before="1">Refusal to grant application for exemption under <intref check="valid" refid="sec.175E" target.guid="_32749e3f-fdb8-4eeb-b18c-71b9f193eb3a">section 175E</intref><intref check="valid" refid="sec.175E-ssec.2" target.guid="_ba6fb184-a933-4687-8151-e63f5f86ab2a">(2)</intref></txt></block></entry></row><row guid="_ffe8c04c-ad8b-43a2-9554-80d52b5a3d3b" id="sch.1-tbl.1-tblr-oc.6" rowsep="0"><entry align="left" colname="1" guid="_45b05d20-21ee-47b8-9536-eaec7ec19348" id="sch.1-tbl.1-tblr-oc.6-tble1" valign="top"><block><txt break.before="1">392BO</txt></block></entry><entry align="left" colname="2" guid="_642b403f-fd39-41fb-bdad-6a9b6ef09783" id="sch.1-tbl.1-tblr-oc.6-tble2" valign="top"><block><txt break.before="1">Decision about whether proposed provision for safety management system is reasonable</txt></block></entry></row><row guid="_167557a0-a9db-415a-9ba2-a639edb1b88d" id="sch.1-tbl.1-tblr-oc.7" rowsep="0"><entry align="left" colname="1" guid="_8907227d-b929-4a75-af6f-1e3c7ce9f726" id="sch.1-tbl.1-tblr-oc.7-tble1" valign="top"><block><txt break.before="1">622</txt></block></entry><entry align="left" colname="2" guid="_45299da9-7912-458c-859b-1f44ebe7c172" id="sch.1-tbl.1-tblr-oc.7-tble2" valign="top"><block><txt break.before="1">Refusal to issue gas quality approval</txt></block></entry></row><row guid="_271a2243-2b5a-499e-a8e0-8a47a90c4ebb" id="sch.1-tbl.1-tblr-oc.8" rowsep="0"><entry align="left" colname="1" guid="_6e3bcc8c-019b-460a-ae58-413ada2de372" id="sch.1-tbl.1-tblr-oc.8-tble1" valign="top"><block><txt break.before="1">625(1) or (6)</txt></block></entry><entry align="left" colname="2" guid="_56849278-6c52-4026-94f3-02297889e89e" id="sch.1-tbl.1-tblr-oc.8-tble2" valign="top"><block><txt break.before="1">Cancellation of gas quality approval</txt></block></entry></row><row guid="_6ee85e81-72ee-4d3b-b04b-241592b9e959" id="sch.1-tbl.1-tblr-oc.9" rowsep="0"><entry align="left" colname="1" guid="_59388b34-7a9f-46d7-bfab-603a93e6d6b2" id="sch.1-tbl.1-tblr-oc.9-tble1" valign="top"><block><txt break.before="1">643(1)</txt></block></entry><entry align="left" colname="2" guid="_c0cbc514-3711-40c2-a84b-bb9d01f6bb30" id="sch.1-tbl.1-tblr-oc.9-tble2" valign="top"><block><txt break.before="1">Prohibition or imposition of conditions on use or operation of meter</txt></block></entry></row><row guid="_4ac17ba1-8d60-40fd-9d7f-ce67a2e14bca" id="sch.1-tbl.1-tblr-oc.10" rowsep="0"><entry align="left" colname="1" guid="_008198ee-9c21-4151-a0a7-e0843a6fca5c" id="sch.1-tbl.1-tblr-oc.10-tble1" valign="top"><block><txt break.before="1">646(2)</txt></block></entry><entry align="left" colname="2" guid="_479cac0c-b923-4194-b1cc-bcff5987ba1b" id="sch.1-tbl.1-tblr-oc.10-tble2" valign="top"><block><txt break.before="1">Decision to give revision notice about measurement scheme</txt></block></entry></row><row guid="_156763b6-b476-4c07-8896-79e576f8d09d" id="sch.1-tbl.1-tblr-oc.11" rowsep="0"><entry align="left" colname="1" guid="_e6fd35dd-6be9-47c1-b6bc-03ceb281d37f" id="sch.1-tbl.1-tblr-oc.11-tble1" valign="top"><block><txt break.before="1">646(3)(b)</txt></block></entry><entry align="left" colname="2" guid="_e88762bb-ef90-4bb3-a2fb-7104fa22bc02" id="sch.1-tbl.1-tblr-oc.11-tble2" valign="top"><block><txt break.before="1">Decision about period to comply with revision notice</txt></block></entry></row><row guid="_820efee5-0c0c-476c-aab0-4e06f7037401" id="sch.1-tbl.1-tblr-oc.12" rowsep="0"><entry align="left" colname="1" guid="_a884b620-a8c0-41b9-9d98-59903ae92236" id="sch.1-tbl.1-tblr-oc.12-tble1" valign="top"><block><txt break.before="1">681(2)</txt></block></entry><entry align="left" colname="2" guid="_665e7d9b-9442-4655-8df7-44cf7abde185" id="sch.1-tbl.1-tblr-oc.12-tble2" valign="top"><block><txt break.before="1">Decision to give revision notice about safety management system</txt></block></entry></row><row guid="_8a934732-c77b-4594-a0ec-4fe8da1e198d" id="sch.1-tbl.1-tblr-oc.13" rowsep="0"><entry align="left" colname="1" guid="_f5423b0d-536b-4f0b-9221-15c2d980a8ec" id="sch.1-tbl.1-tblr-oc.13-tble1" valign="top"><block><txt break.before="1">681(3)(b)</txt></block></entry><entry align="left" colname="2" guid="_7270c244-85d2-4399-99d2-5ef5a33f1fcf" id="sch.1-tbl.1-tblr-oc.13-tble2" valign="top"><block><txt break.before="1">Decision about period to comply with revision notice</txt></block></entry></row><row guid="_192d2c22-cba5-4490-b494-932236feb6e0" id="sch.1-tbl.1-tblr-oc.14" rowsep="0"><entry align="left" colname="1" guid="_976534ad-b5e4-4ee0-8500-25d2e630cc2d" id="sch.1-tbl.1-tblr-oc.14-tble1" valign="top"><block><txt break.before="1">728C</txt></block></entry><entry align="left" colname="2" guid="_1c8558e8-690b-4ec8-90cf-653b0aae1c2e" id="sch.1-tbl.1-tblr-oc.14-tble2" valign="top"><block><txt break.before="1">Refusal of application for gas work licence or authorisation</txt></block></entry></row><row guid="_9d419be4-4e4b-4cf8-a21a-8490198672a4" id="sch.1-tbl.1-tblr-oc.15" rowsep="0"><entry align="left" colname="1" guid="_776a92a7-fe39-4219-944e-b0350fe26e85" id="sch.1-tbl.1-tblr-oc.15-tble1" valign="top"><block><txt break.before="1">728C</txt></block></entry><entry align="left" colname="2" guid="_32a422e7-258c-4ed2-9cf5-aabcbc757ae0" id="sch.1-tbl.1-tblr-oc.15-tble2" valign="top"><block><txt break.before="1">Decision to impose a condition on, or to limit, a gas work licence or authorisation, other than a condition or limitation agreed to or requested by the applicant</txt></block></entry></row><row change="ins" guid="_d5f08885-5931-4b50-8994-c56b46ae044d" id="sch.1-tbl.1-tblr-oc.16" rowsep="0"><entry colname="1" guid="_b18390ab-2165-453a-a462-86215c05a162" id="sch.1-tbl.1-tblr-oc.16-tble1"><block><txt break.before="1">731AD</txt></block></entry><entry colname="2" guid="_74129966-6dc0-4698-84ba-4d519a8bd71a" id="sch.1-tbl.1-tblr-oc.16-tble2"><block><txt break.before="1">Refusal of application for gas device approval authority</txt></block></entry></row><row change="ins" guid="_e2dc6974-c05a-46eb-87a9-323b48bcbeb0" id="sch.1-tbl.1-tblr-oc.17" rowsep="0"><entry colname="1" guid="_09829d93-21e3-463a-bb00-fc2881e95bbd" id="sch.1-tbl.1-tblr-oc.17-tble1"><block><txt break.before="1">731AD</txt></block></entry><entry colname="2" guid="_801afcc8-b91b-44d3-bc76-23e2cba46492" id="sch.1-tbl.1-tblr-oc.17-tble2"><block><txt break.before="1">Decision to impose condition on a gas device approval authority, other than a condition agreed to or requested by the applicant</txt></block></entry></row><row guid="_0d635321-3c0c-4761-830f-373fe4225c9d" id="sch.1-tbl.1-tblr-oc.18" rowsep="0"><entry align="left" colname="1" guid="_de5e7d02-816f-415c-bd0e-90c9c401e5c0" id="sch.1-tbl.1-tblr-oc.18-tble1" valign="top"><block><txt break.before="1">763</txt></block></entry><entry align="left" colname="2" guid="_62677646-11c5-443a-ae16-10abbeab628d" id="sch.1-tbl.1-tblr-oc.18-tble2" valign="top"><block><txt break.before="1">Decision to seize a thing</txt></block></entry></row><row guid="_ebde9d07-ff61-4a8d-b40d-36de50c94452" id="sch.1-tbl.1-tblr-oc.19" rowsep="0"><entry align="left" colname="1" guid="_19fe2671-614f-4a2f-9733-b2d34d7d197b" id="sch.1-tbl.1-tblr-oc.19-tble1" valign="top"><block><txt break.before="1">772(3)(a)</txt></block></entry><entry align="left" colname="2" guid="_5da6773f-d856-410e-9092-274faf05fafa" id="sch.1-tbl.1-tblr-oc.19-tble2" valign="top"><block><txt break.before="1">Decision to retain a seized thing</txt></block></entry></row><row guid="_1cc1ab23-dca4-41c0-8fd3-de537b7eb022" id="sch.1-tbl.1-tblr-oc.20" rowsep="0"><entry align="left" colname="1" guid="_e7718ac8-6131-465c-888b-79031fbc3d4c" id="sch.1-tbl.1-tblr-oc.20-tble1" valign="top"><block><txt break.before="1">773(1)(c), (d) or (e)</txt></block></entry><entry align="left" colname="2" guid="_50a677e7-88eb-411d-818b-be5920cb9820" id="sch.1-tbl.1-tblr-oc.20-tble2" valign="top"><block><txt break.before="1">Forfeiture of seized thing</txt></block></entry></row><row guid="_270b8f32-9544-44cf-8cd7-56e65f2ff3bc" id="sch.1-tbl.1-tblr-oc.21" rowsep="0"><entry align="left" colname="1" guid="_c1d5f5ce-18fe-4ce2-ba2f-0d384a15f7bd" id="sch.1-tbl.1-tblr-oc.21-tble1" valign="top"><block><txt break.before="1">780(2)</txt></block></entry><entry align="left" colname="2" guid="_b63ec620-af26-4c65-987c-bb9984ba6485" id="sch.1-tbl.1-tblr-oc.21-tble2" valign="top"><block><txt break.before="1">Decision to give compliance direction</txt></block></entry></row><row guid="_f2aa1d38-4d79-4419-8fea-133ba40f34b3" id="sch.1-tbl.1-tblr-oc.22" rowsep="0"><entry align="left" colname="1" guid="_120342be-2c2e-404a-8807-d2ca6fed4f22" id="sch.1-tbl.1-tblr-oc.22-tble1" valign="top"><block><txt break.before="1">780(2) and 781(1)</txt></block></entry><entry align="left" colname="2" guid="_953a069c-2aff-4b59-9d0e-18c1a21a82f8" id="sch.1-tbl.1-tblr-oc.22-tble2" valign="top"><block><txt break.before="1">Decision about period to remedy contravention or avoid likely contravention the subject of compliance direction</txt></block></entry></row><row guid="_e23dc24b-d634-44ab-8dcb-3d0a2eccd14c" id="sch.1-tbl.1-tblr-oc.23" rowsep="0"><entry align="left" colname="1" guid="_d229e9b5-286d-4dc7-8eed-7e2b9976fe57" id="sch.1-tbl.1-tblr-oc.23-tble1" valign="top"><block><txt break.before="1">783(2)</txt></block></entry><entry align="left" colname="2" guid="_8c2a7682-c93b-4acc-8c8e-2f01e49ce36f" id="sch.1-tbl.1-tblr-oc.23-tble2" valign="top"><block><txt break.before="1">Decision to give dangerous situation direction</txt></block></entry></row><row guid="_3ec6257f-c2a9-497a-9c7e-2256955ebc8e" id="sch.1-tbl.1-tblr-oc.24" rowsep="0"><entry align="left" colname="1" guid="_33469070-20c3-4ff8-9afa-fb0f1920fde1" id="sch.1-tbl.1-tblr-oc.24-tble1" valign="top"><block><txt break.before="1">783(2) and 784(1)</txt></block></entry><entry align="left" colname="2" guid="_2e4231e8-a15a-4896-b625-ce686ae80f70" id="sch.1-tbl.1-tblr-oc.24-tble2" valign="top"><block><txt break.before="1">Decision about period to take steps reasonably necessary to prevent, remove or minimise danger the subject of dangerous situation</txt></block></entry></row><row guid="_189506ca-4cb6-42a1-b0ab-ef71ec81f0dc" id="sch.1-tbl.1-tblr-oc.25" rowsep="0"><entry align="left" colname="1" guid="_f391c8af-b971-4e92-b20c-e96503795697" id="sch.1-tbl.1-tblr-oc.25-tble1" valign="top"><block><txt break.before="1">798</txt></block></entry><entry align="left" colname="2" guid="_1921c47a-6990-4904-92cd-b9d126490704" id="sch.1-tbl.1-tblr-oc.25-tble2" valign="top"><block><txt break.before="1">Decision by chief inspector to take proposed noncompliance action for gas work licence<ins xml:space="preserve">, gas work authorisation</ins> or <del xml:space="preserve">authorisation</del><ins xml:space="preserve">gas device approval authority</ins></txt></block></entry></row></tbody></tgroup></table></block><block><table colsep="0" font.size="12.pt" frame="none" guid="_2a2a5ff4-c3b2-4afd-bf91-4a1ff9523d8d" heading.align="left" id="sch.1-tbl.2" orient="port" rowsep="0"><no>Table 2</no><heading guid="_043301fb-7a86-47e5-b96f-f3343931b01a" id="sch.1-tbl.2-he">Decisions subject to appeal</heading><tgroup cols="3" colsep="0" rowsep="0" tgroupstyle="3columnUnRuled"><colspec colname="1" colnum="1" colsep="0" colwidth="0.970in"/><colspec colname="2" colnum="2" colsep="0" colwidth="2.983in"/><colspec colname="3" colnum="3" colsep="0" colwidth="1.048in"/><thead><row guid="_b9fc344d-848f-46ea-9b23-36880117d695" id="sch.1-tbl.2-tblh-tblr" rowsep="0"><entry align="left" colname="1" guid="_33d7dfb2-b5c5-482b-93cc-d99cfde71a42" id="sch.1-tbl.2-tblh-tblr-tble1" valign="top"><block><txt break.before="1">Section reference</txt></block></entry><entry align="left" colname="2" guid="_1a11b48d-66ae-4ba5-bc8f-1c958f717106" id="sch.1-tbl.2-tblh-tblr-tble2" valign="top"><block><txt break.before="1">Description of decision</txt></block></entry><entry align="left" colname="3" guid="_4592e2e2-dfa9-4e58-ab0c-f57f88d4910a" id="sch.1-tbl.2-tblh-tblr-tble3" valign="top"><block><txt break.before="1">Appeal</txt></block><block><txt break.before="1">body</txt></block></entry></row></thead><tbody><row guid="_f6d71d53-2bb7-4560-8ed4-059543966f1b" id="sch.1-tbl.2-tblr" rowsep="0"><entry align="left" guid="_a66cf801-be7d-4f9b-a2cd-1da5f99b380b" id="sch.1-tbl.2-tblr-tble1" nameend="2" namest="1" valign="top"><block><txt break.before="1"><b>Authorities to prospect</b></txt></block></entry><entry align="left" colname="3" guid="_988e09f4-28af-498d-93c7-eb4e4b3ad9e0" id="sch.1-tbl.2-tblr-tble3" valign="top"/></row><row guid="_5cf6f866-4f23-420c-9eab-4dfa0d882e3f" id="sch.1-tbl.2-tblr-oc.2" rowsep="0"><entry align="left" colname="1" guid="_0b07a510-bc17-49ec-b101-8b50dc4e84fe" id="sch.1-tbl.2-tblr-oc.2-tble1" valign="top"><block><txt break.before="1">57</txt></block></entry><entry align="left" colname="2" guid="_0fe5b821-20d9-4d55-80f4-26028eaeb5ed" id="sch.1-tbl.2-tblr-oc.2-tble2" valign="top"><block><txt break.before="1">Refusal to approve proposed later work program</txt></block></entry><entry align="left" colname="3" guid="_cb1954a8-955c-47b0-9135-0fb3c0255c85" id="sch.1-tbl.2-tblr-oc.2-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_356eed56-1cdc-49f8-a7f8-fb878addda0b" id="sch.1-tbl.2-tblr-oc.3" rowsep="0"><entry align="left" colname="1" guid="_d210598e-19de-4114-b62e-e0e18b650224" id="sch.1-tbl.2-tblr-oc.3-tble1" valign="top"><block><txt break.before="1">62</txt></block></entry><entry align="left" colname="2" guid="_a82a54db-2ef0-4842-a304-a66a949c30f4" id="sch.1-tbl.2-tblr-oc.3-tble2" valign="top"><block><txt break.before="1">Refusal to approve amendment to work program</txt></block></entry><entry align="left" colname="3" guid="_b354d8b0-fce9-42af-82f0-db1c6f8fcbc8" id="sch.1-tbl.2-tblr-oc.3-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_6fd7f743-9714-4abc-bc63-2e38d2c0b918" id="sch.1-tbl.2-tblr-oc.4" rowsep="0"><entry align="left" colname="1" guid="_c086f9af-004d-4dbb-bcd7-14c3d2626b72" id="sch.1-tbl.2-tblr-oc.4-tble1" valign="top"><block><txt break.before="1">84</txt></block></entry><entry align="left" colname="2" guid="_c4435b1f-19de-43bc-a565-8952df0d99e4" id="sch.1-tbl.2-tblr-oc.4-tble2" valign="top"><block><txt break.before="1">Refusal to renew authority to prospect</txt></block></entry><entry align="left" colname="3" guid="_a530cc4c-8335-4857-9787-00a305e7ddfa" id="sch.1-tbl.2-tblr-oc.4-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_e9faedf9-4ba7-495e-ab55-69ff05d41c73" id="sch.1-tbl.2-tblr-oc.5" rowsep="0"><entry align="left" colname="1" guid="_8bf02b55-3e28-4fe8-98e4-c97ab1524dcb" id="sch.1-tbl.2-tblr-oc.5-tble1" valign="top"><block><txt break.before="1">90</txt></block></entry><entry align="left" colname="2" guid="_6c668710-742c-428b-83b3-8fc8efcbeb4f" id="sch.1-tbl.2-tblr-oc.5-tble2" valign="top"><block><txt break.before="1">Refusal of application for declaration of potential commercial area</txt></block></entry><entry align="left" colname="3" guid="_7fe28149-da35-4727-9ff8-42d066a4e3b5" id="sch.1-tbl.2-tblr-oc.5-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_adfdfd19-b5e9-447e-bef0-7c72ead4a81e" id="sch.1-tbl.2-tblr-oc.6" rowsep="0"><entry align="left" colname="1" guid="_1f62b896-5df6-4e5e-96b6-49a30d229f45" id="sch.1-tbl.2-tblr-oc.6-tble1" valign="top"><block><txt break.before="1">93</txt></block></entry><entry align="left" colname="2" guid="_f1310587-994a-441c-a2b4-40db2f05e8f3" id="sch.1-tbl.2-tblr-oc.6-tble2" valign="top"><block><txt break.before="1">Refusal of application to extend term of declaration of potential commercial area</txt></block></entry><entry align="left" colname="3" guid="_48559ed0-dddd-40ab-bd43-6f15c2954f78" id="sch.1-tbl.2-tblr-oc.6-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_d16e921f-e6b6-4420-b344-b9469d89c423" id="sch.1-tbl.2-tblr-oc.7" rowsep="0"><entry align="left" colname="1" guid="_da339169-0ae5-495e-bb3d-1640686fbee1" id="sch.1-tbl.2-tblr-oc.7-tble1" valign="top"><block><txt break.before="1">97</txt></block></entry><entry align="left" colname="2" guid="_51c76b9a-c7d5-45bd-9af2-bfc29e32db85" id="sch.1-tbl.2-tblr-oc.7-tble2" valign="top"><block><txt break.before="1">Decision to take proposed action under <intref check="valid" refid="sec.96" target.guid="_0b09b268-b9f5-4054-80b3-b09455617421">section 96</intref> for authority to prospect</txt></block></entry><entry align="left" colname="3" guid="_c645e3a1-d494-4fa8-89ba-2c69c9871acf" id="sch.1-tbl.2-tblr-oc.7-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row change="ins" guid="_265abbe2-ce55-45a6-91b1-6c38c3859989" id="sch.1-tbl.2-tblr-oc.8" rowsep="0"><entry colname="1" guid="_dc570635-4c71-4eda-8081-f0c8aa0f1592" id="sch.1-tbl.2-tblr-oc.8-tble1"><block><txt break.before="1">107AE(2)</txt></block></entry><entry align="left" colname="2" guid="_1ddb54a9-ee87-4f80-8426-4c361bd74d50" id="sch.1-tbl.2-tblr-oc.8-tble2"><block><txt break.before="1">Refusal to declare amalgamated potential commercial area for authority to prospect</txt></block></entry><entry colname="3" guid="_60b7d4d7-f742-41f2-9628-3fc22b6c7e0d" id="sch.1-tbl.2-tblr-oc.8-tble3"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_c2e1d183-c165-43e8-8e20-6e4947b80d0d" id="sch.1-tbl.2-tblr-oc.9" rowsep="0"><entry align="left" colname="1" guid="_3efe0873-7a63-4e0f-bae9-9c75b551f663" id="sch.1-tbl.2-tblr-oc.9-tble1" valign="top"/><entry align="left" colname="2" guid="_6e1f3c03-3b2c-498d-8655-4cae3805595c" id="sch.1-tbl.2-tblr-oc.9-tble2" valign="top"/><entry align="left" colname="3" guid="_c04528fd-d858-4414-bc4c-a48f445af980" id="sch.1-tbl.2-tblr-oc.9-tble3" valign="top"/></row><row guid="_7064977c-dafc-449d-a286-dc65ff33d78a" id="sch.1-tbl.2-tblr-oc.10" rowsep="0"><entry align="left" guid="_1847e1bc-6d77-40b7-9af7-805013ea7631" id="sch.1-tbl.2-tblr-oc.10-tble1" nameend="2" namest="1" valign="top"><block><txt break.before="1"><b>Petroleum leases</b></txt></block></entry><entry align="center" colname="3" guid="_9698fef0-de48-43ae-9490-a6e8002a172a" id="sch.1-tbl.2-tblr-oc.10-tble3" valign="top"/></row><row guid="_e1c9b94e-153b-4ade-b9c1-b303866ff481" id="sch.1-tbl.2-tblr-oc.11" rowsep="0"><entry align="left" colname="1" guid="_bf0bca48-e211-4987-b9e9-63ab6fae23e3" id="sch.1-tbl.2-tblr-oc.11-tble1" valign="top"><block><txt break.before="1">120</txt></block></entry><entry align="left" colname="2" guid="_6bc361b2-62c9-4344-8490-7f91c7b28295" id="sch.1-tbl.2-tblr-oc.11-tble2" valign="top"><block><txt break.before="1">Decision not to grant a petroleum lease on ATP-related application</txt></block></entry><entry align="left" colname="3" guid="_3dbb9df2-4755-4b56-9006-272a8919804d" id="sch.1-tbl.2-tblr-oc.11-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_30ea5856-ebdf-4b8b-8f37-ac1b23527c70" id="sch.1-tbl.2-tblr-oc.12" rowsep="0"><entry align="left" colname="1" guid="_656b31a9-1367-48d5-9e37-7117c5b8a5e0" id="sch.1-tbl.2-tblr-oc.12-tble1" valign="top"><block><txt break.before="1">147</txt></block></entry><entry align="left" colname="2" guid="_d4910803-9ff0-487a-9bd8-794f4e31040b" id="sch.1-tbl.2-tblr-oc.12-tble2" valign="top"><block><txt break.before="1">Refusal to approve proposed later development plan</txt></block></entry><entry align="left" colname="3" guid="_6de817fb-1c97-431f-8f33-6575978bf3a9" id="sch.1-tbl.2-tblr-oc.12-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_c37a07bf-aed0-448a-817d-452781ceee49" id="sch.1-tbl.2-tblr-oc.13" rowsep="0"><entry align="left" colname="1" guid="_f126884f-94e2-45dc-9ee7-76e546fa93ac" id="sch.1-tbl.2-tblr-oc.13-tble1" valign="top"><block><txt break.before="1">148</txt></block></entry><entry align="left" colname="2" guid="_e0205229-069b-4403-ac4e-00c3350918be" id="sch.1-tbl.2-tblr-oc.13-tble2" valign="top"><block><txt break.before="1">Deferral of approval of later development plan</txt></block></entry><entry align="left" colname="3" guid="_5bde4813-aaa3-4799-a494-dbc0b6ab1bd1" id="sch.1-tbl.2-tblr-oc.13-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_b40af972-06d9-45a5-b44b-1edb213ffbb7" id="sch.1-tbl.2-tblr-oc.14" rowsep="0"><entry align="left" colname="1" guid="_85e4348e-fa99-4c13-91c4-933f1a08eb80" id="sch.1-tbl.2-tblr-oc.14-tble1" valign="top"><block><txt break.before="1">164</txt></block></entry><entry align="left" colname="2" guid="_4135dbc6-db1b-4175-bdbd-a44802a962a8" id="sch.1-tbl.2-tblr-oc.14-tble2" valign="top"><block><txt break.before="1">Refusal to renew petroleum lease</txt></block></entry><entry align="left" colname="3" guid="_a87a2a3d-891e-43d2-884e-5ffe3f8b41f5" id="sch.1-tbl.2-tblr-oc.14-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row change="ins" guid="_0c7746d0-b21f-4315-bcdc-6514c58a1fff" id="sch.1-tbl.2-tblr-oc.15" rowsep="0"><entry colname="1" guid="_52cc25df-015a-470e-9a9d-697f89989f06" id="sch.1-tbl.2-tblr-oc.15-tble1"><block><txt break.before="1">170F(2)</txt></block></entry><entry align="left" colname="2" guid="_2df01700-712b-448d-9919-c4785ca8edc1" id="sch.1-tbl.2-tblr-oc.15-tble2"><block><txt break.before="1">Refusal to grant amalgamated lease</txt></block></entry><entry colname="3" guid="_e889c876-c728-4a53-a419-b2c38df1fac8" id="sch.1-tbl.2-tblr-oc.15-tble3"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_abbb7d19-fb73-49d0-85a1-b5ad100e827e" id="sch.1-tbl.2-tblr-oc.16" rowsep="0"><entry align="left" colname="1" guid="_10eb753b-1e09-43fe-b661-da217d564311" id="sch.1-tbl.2-tblr-oc.16-tble1" valign="top"><block><txt break.before="1">175AC(1)</txt></block></entry><entry align="left" colname="2" guid="_65544b5f-3413-4ebc-a44e-77e7ec713850" id="sch.1-tbl.2-tblr-oc.16-tble2" valign="top"><block><txt break.before="1">Decision not to change production commencement day for a petroleum lease</txt></block></entry><entry align="left" colname="3" guid="_5295f7f6-a71a-4fdb-bc25-3f51ced593ca" id="sch.1-tbl.2-tblr-oc.16-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_29b21d2f-52d1-4175-9808-e9fa003aa3f6" id="sch.1-tbl.2-tblr-oc.17" rowsep="0"><entry align="left" colname="1" guid="_43b5d3cf-c423-4809-a9c4-235baff58319" id="sch.1-tbl.2-tblr-oc.17-tble1" valign="top"><block><txt break.before="1">175G(3)</txt></block></entry><entry align="left" colname="2" guid="_2c7235a5-72a7-4a33-af79-3baa14f19cea" id="sch.1-tbl.2-tblr-oc.17-tble2" valign="top"><block><txt break.before="1">Refusal to grant application for suspension under <intref check="valid" refid="sec.175E" target.guid="_32749e3f-fdb8-4eeb-b18c-71b9f193eb3a">section 175E</intref><intref check="valid" refid="sec.175E-ssec.1" target.guid="_b6adc691-5e11-4a35-8c17-26ed6596c5ed">(1)</intref></txt></block></entry><entry align="left" colname="3" guid="_f58e6603-607e-4d15-9099-9c5091243bac" id="sch.1-tbl.2-tblr-oc.17-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_859aecdd-9cbe-4f9a-808a-f6ef48efd5a3" id="sch.1-tbl.2-tblr-oc.18" rowsep="0"><entry align="left" colname="1" guid="_d79abd80-1236-43af-b251-012287128c23" id="sch.1-tbl.2-tblr-oc.18-tble1" valign="top"><block><txt break.before="1">215</txt></block></entry><entry align="left" colname="2" guid="_a5940bec-ed01-4273-8fe2-3f1d79f986cc" id="sch.1-tbl.2-tblr-oc.18-tble2" valign="top"><block><txt break.before="1">Decision that claimant does not own stored petroleum or prescribed storage gas</txt></block></entry><entry align="left" colname="3" guid="_f629eec5-aa8b-45e6-af7f-ad84f642871b" id="sch.1-tbl.2-tblr-oc.18-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_6cb19d1c-1def-4b40-b6c9-78ce89910532" id="sch.1-tbl.2-tblr-oc.19" rowsep="0"><entry align="left" colname="1" guid="_2f7b8550-df87-4a40-b6a2-ec60c3b842e2" id="sch.1-tbl.2-tblr-oc.19-tble1" valign="top"/><entry align="left" colname="2" guid="_2a00a849-1013-4a4f-8c4e-0116a301e524" id="sch.1-tbl.2-tblr-oc.19-tble2" valign="top"/><entry align="left" colname="3" guid="_a6359a19-f2f9-4068-97d6-ac7367a1458e" id="sch.1-tbl.2-tblr-oc.19-tble3" valign="top"/></row><row guid="_269204a5-9161-470b-a27e-911bc3797868" id="sch.1-tbl.2-tblr-oc.20" rowsep="0"><entry align="left" guid="_13f85973-3851-4735-88dc-2c1a126a698a" id="sch.1-tbl.2-tblr-oc.20-tble1" nameend="2" namest="1" valign="top"><block><txt break.before="1"><b>Water monitoring authorities</b></txt></block></entry><entry align="left" colname="3" guid="_9c1158d4-ad1f-4c3b-b525-8f7128779c6b" id="sch.1-tbl.2-tblr-oc.20-tble3" valign="top"/></row><row guid="_0fbdf704-e502-4a29-bab4-56a3be2096a5" id="sch.1-tbl.2-tblr-oc.21" rowsep="0"><entry align="left" colname="1" guid="_9295edeb-cec4-47ed-b61e-b783803b1f2b" id="sch.1-tbl.2-tblr-oc.21-tble1" valign="top"><block><txt break.before="1">203</txt></block></entry><entry align="left" colname="2" guid="_98b76dce-e31a-4d4d-9653-1d7def0d3888" id="sch.1-tbl.2-tblr-oc.21-tble2" valign="top"><block><txt break.before="1">Decision to refuse amendment of water monitoring authority or to grant water monitoring authority subject to the applicant’s written agreement to the Minister amending the authority in a stated way that the Minister considers appropriate</txt></block></entry><entry align="left" colname="3" guid="_825099ac-ec9a-4abd-943e-fcc7438407fe" id="sch.1-tbl.2-tblr-oc.21-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_e4b88e6c-e867-476c-a2f5-0f5c63745b14" id="sch.1-tbl.2-tblr-oc.22" rowsep="0"><entry align="left" colname="1" guid="_4a9ef23e-5ccd-45f7-8b91-3c23a12677fe" id="sch.1-tbl.2-tblr-oc.22-tble1" valign="top"/><entry align="left" colname="2" guid="_ec7ff35e-e673-48e7-831b-56d29ec154ec" id="sch.1-tbl.2-tblr-oc.22-tble2" valign="top"/><entry align="left" colname="3" guid="_9d2290e1-c0ba-42a6-bd4a-cf80f99574c2" id="sch.1-tbl.2-tblr-oc.22-tble3" valign="top"/></row><row guid="_ef0f3252-311d-4fc0-b083-c4c4dc01bd5a" id="sch.1-tbl.2-tblr-oc.23" rowsep="0"><entry align="left" guid="_6086a397-3820-4e48-8847-e6f4aa44f671" id="sch.1-tbl.2-tblr-oc.23-tble1" nameend="2" namest="1" valign="top"><block><txt break.before="1"><b>Coordination arrangements</b></txt></block></entry><entry align="center" colname="3" guid="_073cdb9c-5bfc-4b71-bac7-52fdabfd8196" id="sch.1-tbl.2-tblr-oc.23-tble3" valign="top"/></row><row guid="_6dd3a4b1-a099-4b7c-b175-6213a75b0194" id="sch.1-tbl.2-tblr-oc.24" rowsep="0"><entry align="left" colname="1" guid="_c84a563b-ed8e-4d74-8926-7aeca0bd3f64" id="sch.1-tbl.2-tblr-oc.24-tble1" valign="top"><block><txt break.before="1">242</txt></block></entry><entry align="left" colname="2" guid="_5cc29eeb-912d-4a21-b5dd-f048f2ff60bb" id="sch.1-tbl.2-tblr-oc.24-tble2" valign="top"><block><txt break.before="1">Cancellation of coordination arrangement</txt></block></entry><entry align="left" colname="3" guid="_79904fc3-7c19-4430-b8a9-fa8c51b46e51" id="sch.1-tbl.2-tblr-oc.24-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_db4b8daf-8df1-4323-b5d5-03f3a12ffeb1" id="sch.1-tbl.2-tblr-oc.25" rowsep="0"><entry align="left" colname="1" guid="_2957e1f1-b9de-40fe-9041-c28cd6724aab" id="sch.1-tbl.2-tblr-oc.25-tble1" valign="top"/><entry align="left" colname="2" guid="_5c9daa10-542b-42dd-9eac-47acad78b371" id="sch.1-tbl.2-tblr-oc.25-tble2" valign="top"/><entry align="left" colname="3" guid="_8a517324-f8bf-4303-b9c5-3e823fe9a401" id="sch.1-tbl.2-tblr-oc.25-tble3" valign="top"/></row><row guid="_4def294e-d7ad-4600-8fba-dd315769db25" id="sch.1-tbl.2-tblr-oc.26" rowsep="0"><entry align="left" colname="1" guid="_72822901-b7f7-4b5a-949b-45992c2a63bc" id="sch.1-tbl.2-tblr-oc.26-tble1" valign="top"><block><txt break.before="1"><b>Licences</b></txt></block></entry><entry align="left" colname="2" guid="_69f6faa5-902f-4777-9492-322cc383a065" id="sch.1-tbl.2-tblr-oc.26-tble2" valign="top"/><entry align="left" colname="3" guid="_6e3b799b-8288-43bf-92d7-f38ada484288" id="sch.1-tbl.2-tblr-oc.26-tble3" valign="top"/></row><row guid="_7e00c034-135f-4765-89cd-c80642f82827" id="sch.1-tbl.2-tblr-oc.27" rowsep="0"><entry align="left" colname="1" guid="_8f5e03ab-7440-467a-bc0f-c1bb34e767bc" id="sch.1-tbl.2-tblr-oc.27-tble1" valign="top"><block><txt break.before="1">410</txt></block></entry><entry align="left" colname="2" guid="_bea8bed1-ab69-424d-a02c-b30eea7bd235" id="sch.1-tbl.2-tblr-oc.27-tble2" valign="top"><block><txt break.before="1">Refusal to grant pipeline licence</txt></block></entry><entry align="left" colname="3" guid="_b7c469d2-8eeb-46e4-a695-bade10d63386" id="sch.1-tbl.2-tblr-oc.27-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_b13a3ccd-7063-4647-89e0-03360ed75ca1" id="sch.1-tbl.2-tblr-oc.28" rowsep="0"><entry align="left" colname="1" guid="_4af9914d-36d4-469a-954b-f66f7ec760e8" id="sch.1-tbl.2-tblr-oc.28-tble1" valign="top"><block><txt break.before="1">431</txt></block></entry><entry align="left" colname="2" guid="_cf4c6419-468a-4fe1-b8f4-38088758ac28" id="sch.1-tbl.2-tblr-oc.28-tble2" valign="top"><block><txt break.before="1">Decision to give works direction</txt></block></entry><entry align="left" colname="3" guid="_885c27db-94d9-4a71-ab73-8f3561013a64" id="sch.1-tbl.2-tblr-oc.28-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_826d747f-a132-4621-82e0-5a40728967b7" id="sch.1-tbl.2-tblr-oc.29" rowsep="0"><entry align="left" colname="1" guid="_9d6234ed-aefa-4275-b371-190bd9c505fe" id="sch.1-tbl.2-tblr-oc.29-tble1" valign="top"><block><txt break.before="1">436(3)</txt></block></entry><entry align="left" colname="2" guid="_054fbd95-5d9d-4592-abb5-c1ace62eb6f7" id="sch.1-tbl.2-tblr-oc.29-tble2" valign="top"><block><txt break.before="1">Amendment of pipeline licence condition</txt></block></entry><entry align="left" colname="3" guid="_7bec4979-6bf2-4d3a-b325-23f322c2bd83" id="sch.1-tbl.2-tblr-oc.29-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_7a1abf9e-c6ef-4368-9955-e73365874ca8" id="sch.1-tbl.2-tblr-oc.30" rowsep="0"><entry align="left" colname="1" guid="_4a969af8-5d7b-4437-aa15-47c986a6b3ba" id="sch.1-tbl.2-tblr-oc.30-tble1" valign="top"><block><txt break.before="1">446</txt></block></entry><entry align="left" colname="2" guid="_cb963b91-5631-4605-b4f3-58ee81413713" id="sch.1-tbl.2-tblr-oc.30-tble2" valign="top"><block><txt break.before="1">Refusal to grant petroleum facility licence</txt></block></entry><entry align="left" colname="3" guid="_364c857a-c433-4c88-a9ea-005b46780ae1" id="sch.1-tbl.2-tblr-oc.30-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_a9dfd79a-85a5-47d2-af01-2bee9b80110f" id="sch.1-tbl.2-tblr-oc.31" rowsep="0"><entry align="left" colname="1" guid="_9e642d1b-67a3-430f-9a7e-e04eed22d2d7" id="sch.1-tbl.2-tblr-oc.31-tble1" valign="top"><block><txt break.before="1">473</txt></block></entry><entry align="left" colname="2" guid="_0609281a-d9c5-483f-90df-896a5abf421e" id="sch.1-tbl.2-tblr-oc.31-tble2" valign="top"><block><txt break.before="1">Decision to cancel <intref check="invalid" refid="pt.5">part 5</intref> permission</txt></block></entry><entry align="left" colname="3" guid="_e9026d27-b7bc-4b65-8148-afb96910b0b3" id="sch.1-tbl.2-tblr-oc.31-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_9d1e4d2f-afab-4581-b403-a89cbd32b7b8" id="sch.1-tbl.2-tblr-oc.32" rowsep="0"><entry align="left" colname="1" guid="_c2b48c0d-a5bd-4b15-a380-807d2ad21995" id="sch.1-tbl.2-tblr-oc.32-tble1" valign="top"><block><txt break.before="1">477</txt></block></entry><entry align="left" colname="2" guid="_5ffb2d5d-4044-44fb-97c3-9d451241aae0" id="sch.1-tbl.2-tblr-oc.32-tble2" valign="top"><block><txt break.before="1">Refusal of licence amendment application</txt></block></entry><entry align="left" colname="3" guid="_e4315c6e-3daf-42ac-89f2-58b106477c30" id="sch.1-tbl.2-tblr-oc.32-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_89d18ba4-0dab-4e7b-a5e5-907c954c7ba4" id="sch.1-tbl.2-tblr-oc.33" rowsep="0"><entry align="left" colname="1" guid="_01e28cf5-98f7-4e0d-ae77-b7b61996dc1a" id="sch.1-tbl.2-tblr-oc.33-tble1" valign="top"><block><txt break.before="1">482</txt></block></entry><entry align="left" colname="2" guid="_919eceac-86c7-4247-9542-e8160754ca85" id="sch.1-tbl.2-tblr-oc.33-tble2" valign="top"><block><txt break.before="1">Refusal to renew licence</txt></block></entry><entry align="left" colname="3" guid="_39b1367a-4d23-4c26-9f71-448e2308a0ea" id="sch.1-tbl.2-tblr-oc.33-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_2d50f470-e115-494d-a3b5-557a789191bf" id="sch.1-tbl.2-tblr-oc.34" rowsep="0"><entry align="left" colname="1" guid="_09e00f05-ca90-4a20-8b03-053625b0a207" id="sch.1-tbl.2-tblr-oc.34-tble1" valign="top"/><entry align="left" colname="2" guid="_fbfd172e-8ff1-4115-a028-1d8a4bb45f1d" id="sch.1-tbl.2-tblr-oc.34-tble2" valign="top"/><entry align="left" colname="3" guid="_9727a433-a9cc-44b4-8dab-7f88b91eba6f" id="sch.1-tbl.2-tblr-oc.34-tble3" valign="top"/></row><row guid="_bd3ee4ff-0ffa-41dc-ac8e-a32649c67e29" id="sch.1-tbl.2-tblr-oc.35" rowsep="0"><entry align="left" guid="_129afc6b-5ff0-42c9-bb1e-ce03fd820630" id="sch.1-tbl.2-tblr-oc.35-tble1" nameend="2" namest="1" valign="top"><block><txt break.before="1"><b>Decisions under <intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref></b></txt></block></entry><entry align="left" colname="3" guid="_aeafd96d-6b17-4628-bd5b-916cb1d71e25" id="sch.1-tbl.2-tblr-oc.35-tble3" valign="top"/></row><row guid="_6ce24e0b-657e-4c58-84e5-6eb64422c64d" id="sch.1-tbl.2-tblr-oc.36" rowsep="0"><entry align="left" colname="1" guid="_31cf609f-c606-4b41-a138-eb82cbe997c9" id="sch.1-tbl.2-tblr-oc.36-tble1" valign="top"><block><txt break.before="1">488</txt></block></entry><entry align="left" colname="2" guid="_aeb75423-169a-44ef-98ff-a237fdbd6a92" id="sch.1-tbl.2-tblr-oc.36-tble2" valign="top"><block><txt break.before="1">Decision to require security for petroleum authority other than security in the form and amount prescribed under <intref check="valid" refid="sec.488" target.guid="_13f8de44-15a4-4a47-a9af-6464bc374dda">section 488</intref><intref check="valid" refid="sec.488-ssec.2" target.guid="_e828d1b3-e8da-4d69-b24e-4d29cbe6b152">(2)</intref></txt></block></entry><entry align="left" colname="3" guid="_497c8847-7458-4cc0-9ca2-6935fc11c5a8" id="sch.1-tbl.2-tblr-oc.36-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_a6936c63-5aaf-4b9f-9b36-98a549f9e8f6" id="sch.1-tbl.2-tblr-oc.37" rowsep="0"><entry align="left" colname="1" guid="_5e4acb4b-edc4-4b97-b3c9-c9a43ce7fcbf" id="sch.1-tbl.2-tblr-oc.37-tble1" valign="top"><block><txt break.before="1">489</txt></block></entry><entry align="left" colname="2" guid="_ccf05420-1213-4d25-a861-3aaf48bd46fe" id="sch.1-tbl.2-tblr-oc.37-tble2" valign="top"><block><txt break.before="1">Decision to require increase in total security required to more than the prescribed amount under <intref check="valid" refid="sec.488" target.guid="_13f8de44-15a4-4a47-a9af-6464bc374dda">section 488</intref><intref check="valid" refid="sec.488-ssec.2" target.guid="_e828d1b3-e8da-4d69-b24e-4d29cbe6b152">(2)</intref> when the requirement is made</txt></block></entry><entry align="left" colname="3" guid="_5c90f3de-87f2-4204-93cc-3c5e44d2fe28" id="sch.1-tbl.2-tblr-oc.37-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_a49c2115-d3f7-4172-9aa0-84293869c434" id="sch.1-tbl.2-tblr-oc.38" rowsep="0"><entry align="left" colname="1" guid="_8c91b7c7-a5ec-4bfe-9e1c-9237a9439707" id="sch.1-tbl.2-tblr-oc.38-tble1" valign="top"><block><txt break.before="1">578</txt></block></entry><entry align="left" colname="2" guid="_c79cdec9-8c0d-4b35-9b6d-2836b6a06e7a" id="sch.1-tbl.2-tblr-oc.38-tble2" valign="top"><block><txt break.before="1">Refusal to approve surrender of petroleum authority</txt></block></entry><entry align="left" colname="3" guid="_a4c04b53-fcc4-4370-afd2-b79d95a77eab" id="sch.1-tbl.2-tblr-oc.38-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_eb4acdc2-6255-4c4a-a17a-1d5097b5ff9c" id="sch.1-tbl.2-tblr-oc.39" rowsep="0"><entry align="left" colname="1" guid="_43e27eb3-f9d0-4d1f-abb1-f15dbdf6ada2" id="sch.1-tbl.2-tblr-oc.39-tble1" valign="top"><block><txt break.before="1">578(3)</txt></block></entry><entry align="left" colname="2" guid="_938f6da0-4619-4dc3-9e9e-5a34370002b4" id="sch.1-tbl.2-tblr-oc.39-tble2" valign="top"><block><txt break.before="1">Decision to approve partial surrender of petroleum authority subject to the applicant’s written agreement to the Minister amending the conditions applying to the rest of the authority in a stated way, if the applicant has not agreed in writing to the amendment</txt></block></entry><entry align="left" colname="3" guid="_d6aef300-37f8-49f0-bd7d-35565024f7fd" id="sch.1-tbl.2-tblr-oc.39-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_f0656675-f878-44c4-8b88-35a78b1fb37e" id="sch.1-tbl.2-tblr-oc.40" rowsep="0"><entry align="left" colname="1" guid="_3527486d-dfbe-4d5d-94a7-47d29cea543e" id="sch.1-tbl.2-tblr-oc.40-tble1" valign="top"><block><txt break.before="1">587(2)</txt></block></entry><entry align="left" colname="2" guid="_c3f59303-1877-4b3e-95b9-09f76f93b016" id="sch.1-tbl.2-tblr-oc.40-tble2" valign="top"><block><txt break.before="1">Decision to take action to ensure compliance with a requirement under this Act of a petroleum authority holder, other than action to which the holder has agreed</txt></block></entry><entry align="left" colname="3" guid="_1cd6010b-879d-4cc5-970f-079c20d86f94" id="sch.1-tbl.2-tblr-oc.40-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_04875387-e07f-42bc-86ce-294d41d1c787" id="sch.1-tbl.2-tblr-oc.41" rowsep="0"><entry align="left" colname="1" guid="_699093a1-91bf-4987-9c4a-bf4f9ab227ca" id="sch.1-tbl.2-tblr-oc.41-tble1" valign="top"/><entry align="left" colname="2" guid="_44c355cd-9e5b-41bb-812c-f42f9409168a" id="sch.1-tbl.2-tblr-oc.41-tble2" valign="top"/><entry align="left" colname="3" guid="_7fc2a70e-a858-4545-98d6-37fbe2be3895" id="sch.1-tbl.2-tblr-oc.41-tble3" valign="top"/></row><row guid="_a2dabc3f-d85a-4b38-a4a5-56bff1511284" id="sch.1-tbl.2-tblr-oc.42" rowsep="0"><entry align="left" guid="_e2984623-8813-4bda-bda9-fcc414c98523" id="sch.1-tbl.2-tblr-oc.42-tble1" nameend="2" namest="1" valign="top"><block><txt break.before="1"><b>Noncompliance action</b></txt></block></entry><entry align="left" colname="3" guid="_736aea2e-f34a-414e-9799-3470f312e85d" id="sch.1-tbl.2-tblr-oc.42-tble3" valign="top"/></row><row guid="_274a2704-e722-416e-8bd1-e56b80ad6d3d" id="sch.1-tbl.2-tblr-oc.43" rowsep="0"><entry align="left" colname="1" guid="_63f28fcd-c96b-4871-8373-318b3550fbea" id="sch.1-tbl.2-tblr-oc.43-tble1" valign="top"><block><txt break.before="1">798</txt></block></entry><entry align="left" colname="2" guid="_ec4d3711-9f07-43a6-8d27-94950b00b5e3" id="sch.1-tbl.2-tblr-oc.43-tble2" valign="top"><block><txt break.before="1">Decision to take noncompliance action for petroleum authority</txt></block></entry><entry align="left" colname="3" guid="_2d6ce617-32d8-4d21-b340-83f75968869a" id="sch.1-tbl.2-tblr-oc.43-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_874d7284-99cc-46b9-b8ab-822f13a49aa4" id="sch.1-tbl.2-tblr-oc.44" rowsep="0"><entry align="left" colname="1" guid="_7b0ff6cb-f4ee-4a11-92b9-ce16d90468f5" id="sch.1-tbl.2-tblr-oc.44-tble1" valign="top"><block><txt break.before="1">798</txt></block></entry><entry align="left" colname="2" guid="_9c61f49b-9c67-4784-8990-f65af0c88d8f" id="sch.1-tbl.2-tblr-oc.44-tble2" valign="top"><block><txt break.before="1">Decision to take proposed noncompliance action for gas work licence<ins xml:space="preserve">, gas work authorisation</ins> or <del xml:space="preserve">authorisation</del><ins xml:space="preserve">gas device approval authority</ins></txt></block></entry><entry align="left" colname="3" guid="_413a020d-d9af-4bd0-a6b8-6ea8555028d9" id="sch.1-tbl.2-tblr-oc.44-tble3" valign="top"><block><txt break.before="1">industrial court</txt></block></entry></row><row guid="_80e5d08c-0543-47a9-9c3a-2e25802c75b8" id="sch.1-tbl.2-tblr-oc.45" rowsep="0"><entry colname="1" guid="_ade09d40-982c-4a9f-ba05-ae4522c0e762" id="sch.1-tbl.2-tblr-oc.45-tble1"/><entry colname="2" guid="_2b09801e-2d07-4d79-b9a3-5a900e4bb0ba" id="sch.1-tbl.2-tblr-oc.45-tble2"/><entry colname="3" guid="_81109330-c6a0-4b4b-b9cd-caf06447b0ff" id="sch.1-tbl.2-tblr-oc.45-tble3"/></row><row guid="_43a3973f-5b9c-40af-992f-b77bbd0ed4b3" id="sch.1-tbl.2-tblr-oc.46" rowsep="0"><entry align="left" guid="_e61a51f2-a4be-418c-9cd0-975a11abe043" id="sch.1-tbl.2-tblr-oc.46-tble1" nameend="2" namest="1" valign="top"><block><txt break.before="1"><b>Other decisions</b></txt></block></entry><entry align="left" colname="3" guid="_196f752f-f1d6-49fe-bde4-34c67b1a1a3a" id="sch.1-tbl.2-tblr-oc.46-tble3" valign="top"/></row><row guid="_50dfd252-496f-4a38-91d7-7111424ec1cf" id="sch.1-tbl.2-tblr-oc.47" rowsep="0"><entry align="left" colname="1" guid="_7579df8b-3414-4c50-8600-bb3ac094bb4e" id="sch.1-tbl.2-tblr-oc.47-tble1" valign="top"><block><txt break.before="1">592</txt></block></entry><entry align="left" colname="2" guid="_673be431-06e5-4cd9-9fbf-63f9d8f9691f" id="sch.1-tbl.2-tblr-oc.47-tble2" valign="top"><block><txt break.before="1">Decision about required measurement or information</txt></block></entry><entry align="left" colname="3" guid="_c7eb8290-6c78-41c5-ba2b-21f249ce9db6" id="sch.1-tbl.2-tblr-oc.47-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_3d5d735c-c140-4a07-976d-08151a38ce51" id="sch.1-tbl.2-tblr-oc.48" rowsep="0"><entry align="left" colname="1" guid="_255f920c-66f9-4b7f-a163-4e36c13ee185" id="sch.1-tbl.2-tblr-oc.48-tble1" valign="top"><block><txt break.before="1">604</txt></block></entry><entry align="left" colname="2" guid="_b1a85db5-8166-4e51-8f49-1e4c96bc2657" id="sch.1-tbl.2-tblr-oc.48-tble2" valign="top"><block><txt break.before="1">Decision that an amount for petroleum royalty is payable and unpaid by petroleum producer</txt></block></entry><entry align="left" colname="3" guid="_73390eab-ff39-4333-997a-636b9c30f095" id="sch.1-tbl.2-tblr-oc.48-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row></tbody></tgroup></table></block><block><table colsep="0" font.size="12.pt" frame="none" guid="_5f78bb9e-ce4c-47b6-b0b3-913f8963fbec" heading.align="left" id="sch.1-tbl.3" orient="port" rowsep="0"><no>Table 3</no><heading guid="_fb000ea6-f692-4ca7-a6d9-cec66166c142" id="sch.1-tbl.3-he">Decisions subject to appeal</heading><tgroup cols="3" colsep="0" rowsep="0" tgroupstyle="3columnUnRuled"><colspec colname="1" colnum="1" colsep="0" colwidth="1.095in"/><colspec colname="2" colnum="2" colsep="0" colwidth="2.993in"/><colspec colname="3" colnum="3" colsep="0" colwidth="0.912in"/><thead><row guid="_1e7ca03f-1c89-487f-af63-377ae20a247a" id="sch.1-tbl.3-tblh-tblr" rowsep="0"><entry align="left" colname="1" guid="_b1090f29-937e-43a7-a907-1b705446315b" id="sch.1-tbl.3-tblh-tblr-tble1" valign="top"><block><txt break.before="1">Section reference</txt></block></entry><entry align="left" colname="2" guid="_e7f2e197-3ab7-48bd-8648-ccb6cd3d5fd4" id="sch.1-tbl.3-tblh-tblr-tble2" valign="top"><block><txt break.before="1">Description of decision</txt></block></entry><entry align="left" colname="3" guid="_e414fb3c-5d1b-4701-96bb-842b702163ed" id="sch.1-tbl.3-tblh-tblr-tble3" valign="top"><block><txt break.before="1">Appeal</txt></block><block><txt break.before="1">body</txt></block></entry></row></thead><tbody><row guid="_cd7b8b66-111e-4972-8724-d53177abae50" id="sch.1-tbl.3-tblr" rowsep="0"><entry align="left" guid="_13cae46e-39fc-4cda-88c7-8be363547abb" id="sch.1-tbl.3-tblr-tble1" nameend="2" namest="1" valign="top"><block><txt break.before="1"><b>Decisions under <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref></b></txt></block></entry><entry align="left" colname="3" guid="_22d9b97d-3744-4511-b2df-86dd3dcdd97c" id="sch.1-tbl.3-tblr-tble3" valign="top"/></row><row guid="_749954cb-4d51-400f-87a6-ccfa14eeff5f" id="sch.1-tbl.3-tblr-oc.2" rowsep="0"><entry align="left" colname="1" guid="_dec60848-dccf-4a61-9879-532d11585cea" id="sch.1-tbl.3-tblr-oc.2-tble1" valign="top"><block><txt break.before="1">19(<del xml:space="preserve">3</del><ins xml:space="preserve">2</ins>)</txt></block></entry><entry align="left" colname="2" guid="_07b4df42-e1a4-49c6-b2e1-d90a5cb16bd2" id="sch.1-tbl.3-tblr-oc.2-tble2" valign="top"><block><txt break.before="1">decision to refuse to approve <del xml:space="preserve">registration of a</del><ins xml:space="preserve">a prescribed</ins> dealing, or to approve <del xml:space="preserve">registration of a</del><ins xml:space="preserve">a prescribed</ins> dealing with conditions</txt></block></entry><entry align="left" colname="3" guid="_977c53ec-cbd2-49f9-b1a3-f13d337a6e76" id="sch.1-tbl.3-tblr-oc.2-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_7e628dab-deb1-4c00-88cd-d6e869c64826" id="sch.1-tbl.3-tblr-oc.3" rowsep="0"><entry align="left" colname="1" guid="_b13a17f7-2f4c-42fe-9575-5d946e57f06a" id="sch.1-tbl.3-tblr-oc.3-tble1" valign="top"><block><txt break.before="1">23(3)</txt></block></entry><entry align="left" colname="2" guid="_ae31919e-8dbf-40c4-96e3-f7fa51b84217" id="sch.1-tbl.3-tblr-oc.3-tble2" valign="top"><block><txt break.before="1">decision to refuse to give indicative approval, or to give indicative approval with conditions</txt></block></entry><entry align="left" colname="3" guid="_408eba6f-2b4f-4fac-bb45-6d9084a55366" id="sch.1-tbl.3-tblr-oc.3-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_8d320979-4bc5-40db-8132-961a6dbbabcf" id="sch.1-tbl.3-tblr-oc.4" rowsep="0"><entry align="left" colname="1" guid="_9cddd0c5-c76e-4d2e-8b7e-4f48293def08" id="sch.1-tbl.3-tblr-oc.4-tble1" valign="top"><block><txt break.before="1">59(2)</txt></block></entry><entry align="left" colname="2" guid="_51f17a6b-7799-4af7-abd1-4b3fd92c9fd3" id="sch.1-tbl.3-tblr-oc.4-tble2" valign="top"><block><txt break.before="1">imposition of condition on entry on public land, other than a condition agreed to or requested by the relevant petroleum authority holder</txt></block></entry><entry align="left" colname="3" guid="_bb5fbff9-d276-4002-a89e-cbb2df128ddd" id="sch.1-tbl.3-tblr-oc.4-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_c2b8acbd-c31d-46d7-93fe-1ea67266bf2b" id="sch.1-tbl.3-tblr-oc.5" rowsep="0"><entry align="left" colname="1" guid="_99498bd7-21b2-454a-aba3-481d4f95a666" id="sch.1-tbl.3-tblr-oc.5-tble1" valign="top"><block><txt break.before="1">59(7)</txt></block></entry><entry align="left" colname="2" guid="_3415a258-6e52-4231-a16a-033f4ee03e79" id="sch.1-tbl.3-tblr-oc.5-tble2" valign="top"><block><txt break.before="1">variation of condition imposed on entry on public land, other than a variation agreed to or requested by the relevant petroleum authority holder</txt></block></entry><entry align="left" colname="3" guid="_fffc78ee-5880-49cb-be43-921e20763fc1" id="sch.1-tbl.3-tblr-oc.5-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row><row guid="_da97ef40-9847-4a64-ba57-f5cbdb4166f2" id="sch.1-tbl.3-tblr-oc.6" rowsep="0"><entry align="left" colname="1" guid="_329472f5-be75-4f74-adec-71aa49903cd5" id="sch.1-tbl.3-tblr-oc.6-tble1" valign="top"><block><txt break.before="1">64(1)</txt></block></entry><entry align="left" colname="2" guid="_b39dee47-72a4-4cf4-918e-91645d709b68" id="sch.1-tbl.3-tblr-oc.6-tble2" valign="top"><block><txt break.before="1">decision to give road use direction</txt></block></entry><entry align="left" colname="3" guid="_ac10f79b-bc85-428a-a993-99d2a2620bba" id="sch.1-tbl.3-tblr-oc.6-tble3" valign="top"><block><txt break.before="1">Land Court</txt></block></entry></row></tbody></tgroup></table></block></schedule><schedule affected.by.uncommenced="0" guid="_b152c1f2-c08c-4971-b4fe-7c2394e7c306" id="sch.2" numbering.style="manual" provision.type="other" spent.amends="0" type="schedule"><no>Schedule 2</no><heading guid="_ac0404ee-b5a1-44fa-9215-68e2964b6a30" id="sch.2-he">Dictionary</heading><sourceref affected.by.uncommenced="0" guid="_9d6bfa86-7d15-46a0-8030-a4aa2606bd63" id="sch.2-ref"><intref check="valid" refid="sec.9" target.guid="_993ab369-4586-4a7b-b44a-c6a240050cff">section 9</intref></sourceref><block><deflist><definition affected.by.uncommenced="0" change="del" guid="_b3b1d5a0-e065-43e3-9d55-30575da20ee4-del" id="sch.2-def.2yearextension_-del"><txt break.before="1"><defterm guid="_1a8d2c12-d49a-433c-b899-fbbfb2e803e2-del" id="sch.2-def.2yearextension-del" type="definition">2-year extension</defterm> means the extension by 2 years of an authority to prospect or a program period for a work program as provided for in <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.1" target.guid="_ae224c28-0e3b-4475-a663-d926bb3b8358">part 1</intref>, <intref check="valid" refid="ch.2-pt.1-div.3" target.guid="_68a7a1d9-c152-465c-9d27-7eebd1ad4060">division 3</intref>, <intref check="valid" refid="ch.2-pt.1-div.3-sdiv.7" target.guid="_3cb48cda-44fd-4f32-a505-08926bf73a10">subdivision 7</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_82488d78-7a92-4088-b087-9c7e4a2ed209" id="sch.2-def.12yearperiod_"><txt break.before="1"><defterm guid="_d8392924-2ea2-4305-a760-b2edea258712" id="sch.2-def.12yearperiod" type="definition">12-year period</defterm>, for an authority to prospect, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fc4cd2e8-9098-4000-ab8b-004992326b8b" id="sch.2-def.12yearperiod-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the period of 12 years commencing on the grant of the authority to prospect; or</txt></block></li><li guid="_413732fc-ec48-4811-84d4-1edf9c6ef3b4" id="sch.2-def.12yearperiod-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if it is a renewed authority as mentioned in <intref check="valid" refid="sec.85" target.guid="_023f553a-88c4-406b-83f3-4f1e559fb059">section 85</intref>—the period of 12 years from when the authority to prospect originally took effect.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_efd4a081-54c0-432b-a99a-cf41f1b1da65" id="sch.2-def.1923Act_"><txt break.before="1"><defterm guid="_2198d4b9-0670-4522-b4a7-ff53890e6211" id="sch.2-def.1923Act" type="definition">1923 Act</defterm> means the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="yes">Petroleum Act 1923</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_d4a8b22f-f8f6-4fbd-8192-195e002a280c" id="sch.2-def.1923ActATP_"><txt break.before="1"><defterm guid="_c136dbb6-c3e0-4349-8cfb-09e3c921fe02" id="sch.2-def.1923ActATP" type="definition">1923 Act ATP</defterm> means an authority to prospect under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_484df0b7-3bc6-4e3f-b353-4994121eb9cf" id="sch.2-def.1923Actlease_"><txt break.before="1"><defterm guid="_bff85d13-cfd3-4745-a83b-9be7d134e047" id="sch.2-def.1923Actlease" type="definition">1923 Act lease</defterm> means a lease under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_38a5724a-5250-4958-b890-f7f7f4e20558" id="sch.2-def.1923Actpetroleumtenure_"><txt break.before="1"><defterm guid="_9fa8faf1-99df-44a2-b275-5a64ad8bf032" id="sch.2-def.1923Actpetroleumtenure" type="definition">1923 Act petroleum tenure</defterm> means a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> ATP or <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease.</txt></definition><definition affected.by.uncommenced="0" guid="_fb357ce4-a656-4227-a411-5428ea002055" id="sch.2-def.abandonedoperatingplant_"><txt break.before="1"><defterm guid="_802b902d-9a26-4c91-bf36-8693f32048d4" id="sch.2-def.abandonedoperatingplant" type="definition">abandoned operating plant</defterm>, for <intref check="valid" refid="ch.10" target.guid="_c24d1b74-938d-44f7-b0f2-d23cd9205275">chapter 10</intref>, <intref check="valid" refid="ch.10-pt.3" target.guid="_ab9c9b86-73cb-4fe7-8c14-ab67d64b2ca8">part 3</intref>, see <intref check="valid" refid="sec.799C" target.guid="_27ee6947-88d1-4eb5-9b6e-8e6b5a232a49">section 799C</intref>.</txt></definition><definition affected.by.uncommenced="0" change="ins" guid="_095af27f-e25d-4a8a-b5a2-40468c2e393a" id="sch.2-def.abandonedsite_"><txt break.before="1"><defterm guid="_2511805c-2433-433d-941a-4d788ef97f26" id="sch.2-def.abandonedsite" type="definition">abandoned site</defterm>, for chapter 10, part 3, see section 799B.</txt></definition><definition affected.by.uncommenced="0" guid="_4a16644c-d6ec-4354-aea4-2e117a13c23a" id="sch.2-def.acceptablelevel_"><txt break.before="1"><defterm guid="_172d0179-e7ca-4ee4-b7b8-9da885aae01f" id="sch.2-def.acceptablelevel" type="definition">acceptable level</defterm>, of risk, see <intref check="valid" refid="sec.700" target.guid="_d7c93f4b-8f90-4bc9-b5b6-5cbd15a37916">section 700</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_c68e856b-7989-4d09-a48f-d7a51680ae2d" id="sch.2-def.accessagreement_"><txt break.before="1"><defterm guid="_9a6d459f-167d-4f63-ab30-1eb7e873faba" id="sch.2-def.accessagreement" type="definition">access agreement</defterm> see <intref check="valid" refid="sec.503" target.guid="_56f62098-b822-4334-ae0a-d81b47f06ae8">section 503</intref><intref check="invalid" refid="sec.503-ssec.2">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_c0c96851-d600-48b9-9c8e-d8d395866426" id="sch.2-def.accessland_"><txt break.before="1"><defterm guid="_5109d47e-cd33-4d9c-94bb-c4e18b1c6a58" id="sch.2-def.accessland" type="definition">access land</defterm>, for a petroleum authority, see <intref check="valid" refid="sec.502" target.guid="_73a38ff4-5404-45cc-a4dd-7770153d9b9a">section 502</intref><intref check="invalid" refid="sec.502-ssec.3">(3)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_03f05983-9b54-43e1-b7e8-ca15cbb9579b" id="sch.2-def.accessrights_"><txt break.before="1"><defterm guid="_27164c98-7bdd-4c61-a372-72bce1555c81" id="sch.2-def.accessrights" type="definition">access rights</defterm> see <intref check="valid" refid="sec.502" target.guid="_73a38ff4-5404-45cc-a4dd-7770153d9b9a">section 502</intref><intref check="invalid" refid="sec.502-ssec.2">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_99ad9d99-94b1-43c8-ab9d-ec0f265396c6" id="sch.2-def.acquiredland_"><txt break.before="1"><defterm guid="_39e1b5d3-80dc-407b-b15c-71e2f902c2b5" id="sch.2-def.acquiredland" type="definition">acquired land</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2d9cb618-243a-4fe3-841d-b745fd4fd3a8" id="sch.2-def.acquiredland-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">Land is <defterm guid="_cccebd76-be77-4a81-b7dc-f958b0ddc67a" type="mention">acquired land</defterm> if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3085b5be-43fc-4382-ab47-ffd89e1ea891" id="sch.2-def.acquiredland-para1.1-para2.a" provision.type="other"><no>(a)</no><block><txt break.before="0">it was taken under a resumption law, other than by taking or otherwise creating an easement; and</txt></block></li><li guid="_47037627-0eca-4d02-b205-6d8363b46949" id="sch.2-def.acquiredland-para1.1-para2.b" provision.type="other"><no>(b)</no><block><txt break.before="0">on the taking—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c685a1d6-3d63-469a-9e2d-ad6c5ba7af1a" id="sch.2-def.acquiredland-para1.1-para2.b-para3.i" provision.type="other"><no>(i)</no><block><txt break.before="0">all petroleum interests relating to the land were extinguished under <intref check="valid" refid="sec.30AA" target.guid="_2bac35d6-219a-4bf4-9209-e7717cd0fd8f">section 30AA</intref>; or</txt></block></li><li guid="_3b4db77f-0953-4937-9271-b06e9e49ddc2" id="sch.2-def.acquiredland-para1.1-para2.b-para3.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">all <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> petroleum interests under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> relating to the land were extinguished under <legref check="valid" jurisd="QLD" refid="sec.124A" target.doc.id="act-1923-026" target.guid="_24354105-4158-4778-8242-f643b784b028" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act">section 124A</legref> of that Act.</txt></block></li></list></block></li></list></block></li><li guid="_fc342f42-0e39-4479-b921-294cc8982e55" id="sch.2-def.acquiredland-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">However, land mentioned in paragraph 1 stops being <defterm guid="_14ba9f8a-4320-49f3-908b-34e869a09145" type="mention">acquired land</defterm> if it is included in the area of a new or renewed petroleum tenure granted under this Act.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_b34e80d7-da0d-48fa-aeb7-e59f8ac3c63b" id="sch.2-def.additionalrelinquishmentcondition_"><txt break.before="1"><defterm guid="_6a60201c-49c3-45c3-82f4-6d9a3c83b978" id="sch.2-def.additionalrelinquishmentcondition" type="definition">additional relinquishment condition</defterm> see <intref check="valid" refid="sec.62" target.guid="_3de82f6d-a0e1-4633-a9a2-28d63af7dcba">section 62</intref><intref check="valid" refid="sec.62-ssec.6" target.guid="_77cebac4-2b47-431b-9055-2fd2df9b4ca0">(6)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_4c40849d-f262-42a9-a994-74012a7f3660" id="sch.2-def.adjacentlease_"><txt break.before="1"><defterm guid="_fc4a1e01-b8b6-4e24-864a-dbfce375043c" id="sch.2-def.adjacentlease" type="definition">adjacent lease</defterm> see <intref check="valid" refid="sec.113" target.guid="_5fe4d62a-9b48-497e-bfcb-3f341fa79321">section 113</intref><intref check="valid" refid="sec.113-para1.a" target.guid="_9b8db646-7a9f-417d-aa3e-63d2ef2992b5">(a)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_1b3b93a8-a23d-4125-b108-e9d59d9a57e3" id="sch.2-def.administrator_"><txt break.before="1"><defterm guid="_31ed11fb-567a-4560-affe-b78444346bda" id="sch.2-def.administrator" type="definition">administrator</defterm>, for <intref check="valid" refid="ch.6" target.guid="_1179c65a-355e-4281-a616-c3e83927d1e4">chapter 6</intref>, <intref check="valid" refid="ch.6-pt.3" target.guid="_043c7be5-9f1a-4efb-93f0-334493cf7967">part 3</intref>, <intref check="valid" refid="ch.6-pt.3-div.2" target.guid="_a37c41c1-27bf-4f02-9771-f9acc51efd1d">division 2</intref>, see <intref check="valid" refid="sec.604AA" target.guid="_9df0b4e0-2f1f-410e-ba01-0a61e66f9f74">section 604AA</intref>.</txt></definition><definition affected.by.uncommenced="0" change="ins" guid="_91ad232a-6683-4eca-9d83-80256c43d45a" id="sch.2-def.affectedland_"><txt break.before="1"><defterm guid="_6da5c69c-0699-4fee-8cb7-1b4fed7c9318" id="sch.2-def.affectedland" type="definition">affected land</defterm>, for chapter 10, part 3, see section 799D(2).</txt></definition><definition affected.by.uncommenced="0" guid="_0f9c6988-3079-4de6-bf9a-990fa6a2814c" id="sch.2-def.affectedparty_"><txt break.before="1"><defterm guid="_c52f5100-fb62-4679-b906-2e7cd740560d" id="sch.2-def.affectedparty" type="definition">affected party</defterm>, for a meter, see <intref check="valid" refid="sec.660" target.guid="_b6da4c1e-9c4a-4cd4-9109-c9f4c02e45ad">section 660</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_6c927531-0d69-49e4-af21-e822fbfe6531" id="sch.2-def.ALA_"><txt break.before="1"><defterm guid="_466b5633-0177-4b3a-b85f-10906d42fb26" id="sch.2-def.ALA" type="definition">ALA</defterm> means the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="yes">Acquisition of Land Act 1967</name></legref>.</txt></definition><definition affected.by.uncommenced="0" change="ins" guid="_ec776a71-a60b-403c-bd59-e0378d78b0ee" id="sch.2-def.amalgamatedlease_"><txt break.before="1"><defterm guid="_599a9bae-12e5-4562-832a-c8bf42754c5e" id="sch.2-def.amalgamatedlease" type="definition">amalgamated lease</defterm>, for chapter 2, part 2, division 7, subdivision 1A, see section 170A(1) or 170B(1).</txt></definition><definition affected.by.uncommenced="0" change="ins" guid="_471267a0-518a-4d27-acbb-745fefecee65" id="sch.2-def.amalgamatedpotentialcommercialarea_"><txt break.before="1"><defterm guid="_8ddfda98-ebbb-454e-9a74-cc52b08644f7" id="sch.2-def.amalgamatedpotentialcommercialarea" type="definition">amalgamated potential commercial area</defterm>, for chapter 2, part 1, division 8, subdivision 2A, see section 107AA.</txt></definition><definition affected.by.uncommenced="0" guid="_6f4b3e0e-0ae4-4271-8155-0824c810a955" id="sch.2-def.annualreturnperiod_"><txt break.before="1"><defterm guid="_2a504409-9839-4022-bcaf-840542b7f3e3" id="sch.2-def.annualreturnperiod" type="definition">annual return period</defterm> see <intref check="valid" refid="sec.599" target.guid="_1db0354d-fbf0-4e4d-9c43-2f3956288e6d">section 599</intref><intref check="valid" refid="sec.599-ssec.11" target.guid="_462ae810-64c2-4641-b7fc-16d9b2bcd2a8">(11)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_6f0eeba2-d718-4b6e-a492-d27de7e3810b" id="sch.2-def.annualroyaltyreturn_"><txt break.before="1"><defterm guid="_fea5473f-8822-47a1-9741-0d9c949e572a" id="sch.2-def.annualroyaltyreturn" type="definition">annual royalty return</defterm> means an annual royalty return lodged under <intref check="valid" refid="sec.599" target.guid="_1db0354d-fbf0-4e4d-9c43-2f3956288e6d">section 599</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_93d183be-267f-4d71-89f7-a2d929e6d061" id="sch.2-def.appealbody_"><txt break.before="1"><defterm guid="_d91f35f1-82e3-4f13-95a8-1fd67cbfdc33" id="sch.2-def.appealbody" type="definition">appeal body</defterm> see <intref check="valid" refid="sec.823" target.guid="_fd2e0354-d8f4-41c9-bf8c-6aef462df5e4">section 823</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_77e48dad-e976-429d-8956-afdf4ebc817e" id="sch.2-def.appealperiod_"><txt break.before="1"><defterm guid="_b6d8db75-ccef-48c0-8ace-bb52b5b5ded1" id="sch.2-def.appealperiod" type="definition">appeal period</defterm>, for a decision, means the period provided for under <intref check="valid" refid="sec.824" target.guid="_d1accf1c-e35c-4e05-bab9-005a7082a8f7">section 824</intref> for starting an appeal against the decision.</txt></definition><definition affected.by.uncommenced="0" guid="_dcd631d7-61ef-40da-b53e-29254f3f4f7b" id="sch.2-def.applicant_"><txt break.before="1"><defterm guid="_706cbe62-40c8-48b4-b183-a6ed51858794" id="sch.2-def.applicant" type="definition">applicant</defterm>, for <intref check="valid" refid="ch.3A" target.guid="_4864cab3-5ae5-49c9-aeb6-cdfaa85590af">chapter 3A</intref>, <intref check="valid" refid="ch.3A-pt.2" target.guid="_01e4b82f-1ea4-4421-943f-62e694596a35">part 2</intref>, see <intref check="valid" refid="sec.392AD" target.guid="_c36ad7f2-8f74-4517-9563-6a7dba62164c">section 392AD</intref><intref check="valid" refid="sec.392AD-para1.a" target.guid="_59f374c3-2b32-421e-a00b-d16427d971d3">(a)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_ead69119-6de3-4549-9c8d-d78ebf3ecd10" id="sch.2-def.application_"><txt break.before="1"><defterm guid="_fa0d9317-3ef2-42ff-bbb8-8450cb5e0037" id="sch.2-def.application" type="definition">application</defterm> includes a tender in response to a call for tenders.</txt></definition><definition affected.by.uncommenced="0" guid="_fbaf91bc-a1e1-4317-adcd-a4344ff1ea05" id="sch.2-def.apply_"><txt break.before="1"><defterm guid="_e2ab9926-78bf-4461-9932-2025537d3136" id="sch.2-def.apply" type="definition">apply</defterm>, in relation to making an application, has the meaning affected by <intref check="valid" refid="sec.851AA" target.guid="_1bb215c0-29c7-436b-85d1-d8220a60416c">section 851AA</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_830e37ff-6334-4f6c-9183-ef9351376230" id="sch.2-def.appropriatelyqualified_"><txt break.before="1"><defterm guid="_b696d186-4fb0-48c4-a4ea-fd4a641b41d3" id="sch.2-def.appropriatelyqualified" type="definition">appropriately qualified</defterm>, for the performance of a function or exercise of a power, includes having the qualifications, experience and competence to perform the function or exercise the power.</txt></definition><definition affected.by.uncommenced="0" guid="_ea1df5cf-708f-42fc-a971-ebbf50ba0ecf" id="sch.2-def.approvedauditor_"><txt break.before="1"><defterm guid="_5e229f74-e237-4998-a50f-987fb8c1d437" id="sch.2-def.approvedauditor" type="definition">approved auditor</defterm> means a person who, under <intref check="valid" refid="ch.6" target.guid="_1179c65a-355e-4281-a616-c3e83927d1e4">chapter 6</intref>, <intref check="valid" refid="ch.6-pt.4" target.guid="_2fb088f3-cddf-48c1-8eac-64c2a5d99b20">part 4</intref>, holds an appointment as an approved auditor.</txt></definition><definition affected.by.uncommenced="0" guid="_529c49b1-f968-4131-8490-fdcc2f4c00b6" id="sch.2-def.approvedform_"><txt break.before="1"><defterm guid="_9b9b960e-4155-419d-8b33-efa86b72a23a" id="sch.2-def.approvedform" type="definition">approved form</defterm> means the form approved under <intref check="valid" refid="sec.858" target.guid="_e70a01fb-d784-4b83-b079-66f280b9baa6">section 858</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_ba0ac857-0e5d-4057-b33b-760eda38846c" id="sch.2-def.arbitration_"><txt break.before="1"><defterm guid="_baded99b-d75a-4d30-9446-8ddc4d7d7cd8" id="sch.2-def.arbitration" type="definition">arbitration</defterm>, of a dispute, means arbitration of the dispute under the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Common Provisions Act</name></legref>, chapter <del xml:space="preserve"><legref check="valid" jurisd="QLD" refid="ch.4" target.doc.id="act-2014-047" target.guid="_0d62e6fe-c34b-427b-962c-c3c899f79f8b" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">4</legref></del><ins xml:space="preserve">5</ins>, part <del xml:space="preserve"><legref check="valid" jurisd="QLD" refid="ch.4-pt.6" target.doc.id="act-2014-047" target.guid="_2572efe5-970d-4a51-8fd3-0afdbe7caa0f" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">6</legref>, <legref check="invalid" jurisd="QLD" type="act">division 4</legref></del><ins xml:space="preserve">3</ins>.</txt></definition><definition affected.by.uncommenced="0" guid="_6a97ea11-1478-4910-8529-16dc3d9f1dc1" id="sch.2-def.area_"><txt break.before="1"><defterm guid="_b79a9ba3-b612-47f7-94b0-9a0bc9ac401e" id="sch.2-def.area" type="definition">area</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_81caa485-d9a7-46b3-8563-0fb4a52d4c0f" id="sch.2-def.area-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">The <defterm guid="_f034c1c5-d996-436f-ab10-7bf0bb94c9ff" type="mention">area</defterm>, of a petroleum authority, is the land to which the authority is subject, as recorded in the register.</txt></block></li><li guid="_222c5c77-e7c0-4e23-a7cf-890221da09dd" id="sch.2-def.area-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">The <defterm guid="_4afea110-4d80-4da8-a507-eaa3b61ba88c" type="mention">area</defterm>, of a coal or oil shale mining tenement, is the land to which the tenement is subject.</txt></block></li><li guid="_a9d4b671-d868-4aef-a1bd-cdcc01f6f26f" id="sch.2-def.area-para1.3" provision.type="other"><no>3</no><block><txt break.before="0">The <defterm guid="_43a3511a-d4a4-415f-8bb7-14aeaf7c2624" type="mention">area</defterm> of a <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> petroleum tenure is the land comprised in the tenure or to which the tenure is subject, as recorded in the register.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_2da7b4a7-2b05-4ff1-a2c4-c1e04ba9c95d" id="sch.2-def.areapipelinelicence_"><txt break.before="1"><defterm guid="_84543f0c-820b-4426-93ab-ffc6f94ad192" id="sch.2-def.areapipelinelicence" type="definition">area pipeline licence</defterm> see <intref check="valid" refid="sec.404" target.guid="_851fee35-9607-48d6-8329-f130f2f824f1">section 404</intref><intref check="invalid" refid="sec.404-ssec.1">(1)</intref><intref check="invalid" refid="sec.404-ssec.1-para1.a">(a)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_f907257d-8779-46f1-92b1-7122a1576a85" id="sch.2-def.assessment_"><txt break.before="1"><defterm guid="_cfa9e7da-3bbc-4e00-b231-f77b81f7c25c" id="sch.2-def.assessment" type="definition">assessment</defterm>, for <intref check="valid" refid="ch.6" target.guid="_1179c65a-355e-4281-a616-c3e83927d1e4">chapter 6</intref>, see <intref check="valid" refid="sec.592A" target.guid="_bb630892-e7a1-4893-9908-dad90c5a0f49">section 592A</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_bf222b7d-ec67-4bfd-b991-43d4109bb3ef" id="sch.2-def.assessmentcriteria_"><txt break.before="1"><defterm guid="_1f30ea2f-bbf1-4f63-9b4d-8abaf588d4f8" id="sch.2-def.assessmentcriteria" type="definition">assessment criteria</defterm>, for <intref check="valid" refid="ch.3A" target.guid="_4864cab3-5ae5-49c9-aeb6-cdfaa85590af">chapter 3A</intref>, see <intref check="valid" refid="sec.392AE" target.guid="_49bc0e85-6104-48a4-84fe-8d17673d33fd">section 392AE</intref><intref check="valid" refid="sec.392AE-ssec.1" target.guid="_3a8de305-475d-472f-913d-3830d29c024d">(1)</intref><intref check="valid" refid="sec.392AE-ssec.1-para1.b" target.guid="_2aa1324f-fbc3-47be-9347-36a18a5d54ed">(b)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_3a0ab084-330e-4b32-85c5-ed8001fded62" id="sch.2-def.assessmentnotice_"><txt break.before="1"><defterm guid="_a66015b7-44ad-4653-958b-77185305453e" id="sch.2-def.assessmentnotice" type="definition">assessment notice</defterm>, for <intref check="valid" refid="ch.6" target.guid="_1179c65a-355e-4281-a616-c3e83927d1e4">chapter 6</intref>, see <intref check="valid" refid="sec.599E" target.guid="_f3bd3ca8-fda0-4125-8cd2-73093365f846">section 599E</intref><intref check="valid" refid="sec.599E-ssec.1" target.guid="_1d5544b4-baeb-4da8-89e9-65cf01284953">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_0c68954f-2bf8-4175-b083-fb539f1ef194" id="sch.2-def.associatedwater_"><txt break.before="1"><defterm guid="_62fd6c94-2365-4559-8725-bf92428112e4" id="sch.2-def.associatedwater" type="definition">associated water</defterm>, for a petroleum tenure, see <intref check="valid" refid="sec.185" target.guid="_5311db10-8c62-445d-82df-35eda5925626">section 185</intref><intref check="valid" refid="sec.185-ssec.4" target.guid="_3c74c8e3-5113-47d1-9b31-cbcbae30438c">(4)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_0ed9a310-c909-4f1e-be79-7e2636eaa039" id="sch.2-def.ATPproductiontesting_"><txt break.before="1"><defterm guid="_1b494688-e41a-4345-a6e4-da0b80157fce" id="sch.2-def.ATPproductiontesting" type="definition">ATP production testing</defterm> see <intref check="valid" refid="sec.71A" target.guid="_4d4a223e-4703-4e99-a040-ab3ece73040e">section 71A</intref><intref check="valid" refid="sec.71A-ssec.1" target.guid="_b2f249e6-f0bc-4090-8f5d-a0e073f34c2b">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_f6dad0ff-b87a-4bef-97cd-e83cf37972b4" id="sch.2-def.ATPrelatedapplication_"><txt break.before="1"><defterm guid="_9ac025fb-e085-4bf2-9bb4-132dd7b5e247" id="sch.2-def.ATPrelatedapplication" type="definition">ATP-related application</defterm> see <intref check="valid" refid="sec.117" target.guid="_3f8f9173-3607-43d2-a692-aa8f1a2489e8">section 117</intref><intref check="valid" refid="sec.117-ssec.3" target.guid="_22ce6483-aeed-4497-b6e2-98016e1dd59b">(3)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_e1f3fbfc-9344-44c2-8f6a-463f887857e9" id="sch.2-def.ATPstoragetesting_"><txt break.before="1"><defterm guid="_25f66535-5102-468a-94b1-0fcf80412876" id="sch.2-def.ATPstoragetesting" type="definition">ATP storage testing</defterm> see <intref check="valid" refid="sec.71B" target.guid="_01de1f46-50df-428a-a2ea-6a79bb7e8c08">section 71B</intref><intref check="valid" refid="sec.71B-ssec.1" target.guid="_b2de4557-850f-4ef3-983d-8b4af89f443f">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_2264dc04-5ae4-499a-9333-36a810de843d" id="sch.2-def.auditorgeneral_"><txt break.before="1"><defterm guid="_f601a001-8b22-43c4-8aaf-1bc4bf0f5c96" id="sch.2-def.auditorgeneral" type="definition">auditor-general</defterm> means the Queensland Auditor-General under the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-008" target.version.series="ab6d2f98-29b5-4124-a049-3ac711af6708" type="act"><name emphasis="yes">Auditor-General Act 2009</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_17541f60-77ba-46f7-a3de-79947f937a88" id="sch.2-def.Australianmarket_"><txt break.before="1"><defterm guid="_36e0985d-cfe4-447a-b6e1-1bcb9af35252" id="sch.2-def.Australianmarket" type="definition">Australian market</defterm> see <intref check="valid" refid="sec.175B" target.guid="_420af332-66d7-4aa1-9c75-fceb2a403d24">section 175B</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_806667b4-839c-4818-b199-1184b856c201" id="sch.2-def.Australianmarketsupplycondition_"><txt break.before="1"><defterm guid="_7f6c2b57-1850-4e35-befb-49a5a669f269" id="sch.2-def.Australianmarketsupplycondition" type="definition">Australian market supply condition</defterm> see <intref check="valid" refid="sec.175A" target.guid="_a4b50ee9-4830-4d7a-9823-839d183f9fbd">section 175A</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_fa137884-5c05-4f2b-a74d-4bd3c56a70bb" id="sch.2-def.authorisedactivitiesoperatingplant_"><txt break.before="1"><defterm guid="_813d16d8-eee2-44d4-a073-518ed6e29ca1" id="sch.2-def.authorisedactivitiesoperatingplant" type="definition">authorised activities operating plant</defterm>, for <intref check="valid" refid="ch.9" target.guid="_e115e3d8-9707-4c5d-b3e6-be71f8d522ee">chapter 9</intref>, <intref check="valid" refid="ch.9-pt.4" target.guid="_feccc805-854d-490d-9644-dd7ef21961d9">part 4</intref>, <intref check="valid" refid="ch.9-pt.4-div.5" target.guid="_3ccd9143-f883-4790-8d0d-2f2006c5ce9b">division 5</intref>, <intref check="valid" refid="ch.9-pt.4-div.5-sdiv.1" target.guid="_871b13c6-0132-4ee8-8f83-05a6329f2dbf">subdivision 1</intref>, see <intref check="valid" refid="sec.705A" target.guid="_38abe539-5c16-4904-9b11-eaa2a6704baa">section 705A</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_3491230e-ba51-435b-b9a9-707963defa1b" id="sch.2-def.authorisedactivity_"><txt break.before="1"><defterm guid="_2d9d4cd9-b619-4e84-a615-a48a623d2d74" id="sch.2-def.authorisedactivity" type="definition">authorised activity</defterm> see <intref check="valid" refid="sec.22" target.guid="_807fe87c-8af4-4b03-bb5d-d074825623a9">section 22</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_50fa701c-b945-4731-9ff6-4e93118d90d1" id="sch.2-def.authorisedofficer_"><txt break.before="1"><defterm guid="_6ab50175-10f7-452e-8ce7-0e13db038238" id="sch.2-def.authorisedofficer" type="definition">authorised officer</defterm> means a person who, under <intref check="valid" refid="sec.735" target.guid="_85fe3bb6-ecd8-4e7f-a835-361ce2ca84ea">section 735</intref>, holds appointment as an authorised officer.</txt></definition><definition affected.by.uncommenced="0" guid="_044bab10-81d3-4b36-8884-ab9bdeb77316" id="sch.2-def.authorisedperson_"><txt break.before="1"><defterm guid="_e024a525-45a8-4791-b0f6-60491e297375" id="sch.2-def.authorisedperson" type="definition">authorised person</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8a15fa03-e23c-45dc-8d02-49b4a6163152" id="sch.2-def.authorisedperson-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.10" target.guid="_6f7f9284-5836-4486-b63b-35e219633886">part 10</intref>, <intref check="valid" refid="ch.2-pt.10-div.5" target.guid="_703512d1-9e03-4c9d-bd52-82121caabcf5">division 5</intref>, see <intref check="valid" refid="sec.294A" target.guid="_71f74295-f4f8-460f-8ded-c197be9135f3">section 294A</intref>; or</txt></block></li><li guid="_1b6225d7-ce3e-4bf7-80f7-75c7ed2cdad8" id="sch.2-def.authorisedperson-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for <intref check="valid" refid="ch.10" target.guid="_c24d1b74-938d-44f7-b0f2-d23cd9205275">chapter 10</intref>, <intref check="valid" refid="ch.10-pt.3" target.guid="_ab9c9b86-73cb-4fe7-8c14-ab67d64b2ca8">part 3</intref>, see <intref check="valid" refid="sec.799B" target.guid="_64f3af6d-5b3f-4fb5-99d5-00bc8c6a6867">section 799B</intref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_cfd8593c-f9ce-4adb-aa25-d3803779429c" id="sch.2-def.authoritytoprospect_"><txt break.before="1"><defterm guid="_9050a861-3d3d-4884-8d2a-e3b7a14440a9" id="sch.2-def.authoritytoprospect" type="definition">authority to prospect</defterm> see <intref check="valid" refid="sec.18" target.guid="_00606342-13a2-49f5-a337-6c1f809e1f2e">section 18</intref><intref check="valid" refid="sec.18-ssec.1" target.guid="_b50a8cff-43ef-47e2-9531-603839cf5b0c">(1)</intref><intref check="valid" refid="sec.18-ssec.1-para1.a" target.guid="_be852b29-d8eb-4eeb-adf1-0333cc4a7650">(a)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_1138ec48-9d9c-4fe6-a213-cf3e93c21e8d" id="sch.2-def.availablestoragecapacity_"><txt break.before="1"><defterm guid="_26c3b356-69c5-47cd-91f0-2f45efe614c2" id="sch.2-def.availablestoragecapacity" type="definition">available storage capacity</defterm>, for a natural underground reservoir, see <intref check="valid" refid="sec.208" target.guid="_8f1dab85-89a4-4d92-9cab-fb55fe7b9656">section 208</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_d4c02f48-2d96-4f14-bc3b-0cc8eaef935a" id="sch.2-def.block_"><txt break.before="1"><defterm guid="_87656314-5df7-4d8a-9a92-0c55f4e4753c" id="sch.2-def.block" type="definition">block</defterm> see <intref check="valid" refid="sec.29" target.guid="_d20e002f-c415-4051-bfa8-5447f61eb769">section 29</intref><intref check="valid" refid="sec.29-ssec.1" target.guid="_c12e803f-e1bc-454e-a3a2-f4705e07a276">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_15d7fdd5-6e8f-4ef5-9da2-64d7d47f8080" id="sch.2-def.boardofinquiry_"><txt break.before="1"><defterm guid="_1e00a83b-bf1c-4190-9092-fb31065aa937" id="sch.2-def.boardofinquiry" type="definition">board of inquiry</defterm> means a board of inquiry established under <intref check="valid" refid="sec.709" target.guid="_82eafb58-a140-4633-a10b-d5d5f2ad7b78">section 709</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_014b9a95-69af-4366-91ca-735b2feb8031" id="sch.2-def.brine_"><txt break.before="1"><defterm guid="_fb94b561-c411-448c-825a-6c439798c7e7" id="sch.2-def.brine" type="definition">brine</defterm> means saline water with a total concentration of dissolved solids greater than 40,000 milligrams per litre.</txt></definition><definition affected.by.uncommenced="0" change="del" guid="_76793c07-498c-4f03-ae89-2f319585fe3e-del" id="sch.2-def.bulkfuelgasstoragefacility_-del"><txt break.before="1"><defterm guid="_43c93714-2cf2-4d57-9fe5-27963e03736f-del" id="sch.2-def.bulkfuelgasstoragefacility-del" type="definition">bulk fuel gas storage facility</defterm> means a site where fuel gas is stored in a tank and includes all activities relating to the storage and use of the fuel gas at the site, but does not include a site if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e8bd4773-b74b-40cd-a482-658f9fb02285-del" id="sch.2-def.bulkfuelgasstoragefacility-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">the primary use of the fuel gas at the site is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0e1db315-c760-4357-beaf-6727bc1a0872-del" id="sch.2-def.bulkfuelgasstoragefacility-para1.a-para2.i-del" provision.type="other"><no>(i)</no><block><txt break.before="0">the sale of fuel gas to a consumer at the site; or</txt></block></li><li guid="_9d03e4ca-8177-4e1b-981c-d3f023411306-del" id="sch.2-def.bulkfuelgasstoragefacility-para1.a-para2.ii-del" provision.type="other"><no>(ii)</no><block><txt break.before="0">the use of automotive LPG at the site; or</txt></block></li></list></block></li><li guid="_0f973a76-0301-4794-b824-e530a3a4b8e1-del" id="sch.2-def.bulkfuelgasstoragefacility-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">the volume of the tank storing the fuel gas is less than an amount prescribed under a regulation; or</txt></block></li><li guid="_7936d7a8-4788-461a-8541-d14e865c8cd4-del" id="sch.2-def.bulkfuelgasstoragefacility-para1.c-del" provision.type="other"><no>(c)</no><block><txt break.before="0">the tank is connected to a gas device and the consumption of fuel gas by the gas device is less than an amount prescribed under a regulation.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_3e529d60-3f66-44a0-8116-275a68ac3a91" id="sch.2-def.callfortenders_"><txt break.before="1"><defterm guid="_481172ee-e518-4b80-b014-a4d31a38dffa" id="sch.2-def.callfortenders" type="definition">call for tenders</defterm> for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_2dfc6167-4d45-4e24-9c93-5f1da55d2b96" id="sch.2-def.callfortenders-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0"><intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.1" target.guid="_ae224c28-0e3b-4475-a663-d926bb3b8358">part 1</intref>—see <intref check="valid" refid="sec.35" target.guid="_87b53d9f-6f6c-49a9-ad51-118aa252ae58">section 35</intref><intref check="valid" refid="sec.35-ssec.1" target.guid="_ef29a118-7272-415a-b72f-d88191fe8b56">(1)</intref>; or</txt></block></li><li guid="_23b390e7-752c-44c8-9217-e7176c6dce6b" id="sch.2-def.callfortenders-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0"><intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.2" target.guid="_f0429453-3af6-43cd-a6dd-cfc8b78be0a9">part 2</intref>—see <intref check="valid" refid="sec.127" target.guid="_6a587d42-acca-4fdd-9d32-8061b1e8ce8d">section 127</intref><intref check="valid" refid="sec.127-ssec.1" target.guid="_b1d8f271-efa3-4024-9819-be5d1aa65aa1">(1)</intref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_86caf88a-01ec-417a-ad61-7a365d25cd9c" id="sch.2-def.capabilitycriteria_"><txt break.before="1"><defterm guid="_ac31ba09-0463-4e84-ace6-017719e3b3b6" id="sch.2-def.capabilitycriteria" type="definition">capability criteria</defterm> for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dd5add55-b5d9-464e-929c-4912071d8519" id="sch.2-def.capabilitycriteria-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0"><intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.1" target.guid="_ae224c28-0e3b-4475-a663-d926bb3b8358">part 1</intref>—see <intref check="valid" refid="sec.43" target.guid="_2c0b3e46-8914-4834-bfdb-7d2ff2248ba2">section 43</intref><intref check="valid" refid="sec.43-ssec.2" target.guid="_8551419e-69d5-4651-9584-a88023a8434a">(2)</intref>; or</txt></block></li><li guid="_f7579ae9-5b59-4831-8024-07eb2f22e0c6" id="sch.2-def.capabilitycriteria-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0"><intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.2" target.guid="_f0429453-3af6-43cd-a6dd-cfc8b78be0a9">part 2</intref>—see <intref check="valid" refid="sec.121" target.guid="_7ba300a7-78fd-4831-8fe2-a3dc6ea79cf0">section 121</intref><intref check="valid" refid="sec.121-ssec.3" target.guid="_041785bc-64ce-49de-9951-52cc813e170c">(3)</intref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" change="ins" guid="_01fb78e9-66f4-4e42-9af7-2d27303a4949" id="sch.2-def.causes_"><txt break.before="1"><defterm guid="_9f719d3b-a08c-47b8-86c6-c9ffe7ed3dd6" id="sch.2-def.causes" type="definition">causes</defterm>, for chapter 11, part 1AA, see section 799I(2).</txt></definition><definition affected.by.uncommenced="0" change="ins" guid="_67be2579-f9fb-49c0-928a-719266a29028" id="sch.2-def.CEO_"><txt break.before="1"><defterm guid="_273f58a6-bd33-4436-b56e-b7d275be2917" id="sch.2-def.CEO" type="definition">CEO</defterm> means the chief executive officer of RSHQ.</txt></definition><definition affected.by.uncommenced="0" guid="_87a9971e-c6d0-4e4f-8588-411ea19185f1" id="sch.2-def.chiefinspector_"><txt break.before="1"><defterm guid="_cbb63f29-4590-40b2-aec8-a621628efd41" id="sch.2-def.chiefinspector" type="definition">chief inspector</defterm> means the person who, under <intref check="valid" refid="sec.735" target.guid="_85fe3bb6-ecd8-4e7f-a835-361ce2ca84ea">section 735</intref>, holds appointment as the chief inspector, petroleum and gas.</txt></definition><definition affected.by.uncommenced="0" guid="_1c41a04b-a544-44ba-bdc7-fe427291d83c" id="sch.2-def.closingtime_"><txt break.before="1"><defterm guid="_19f56a0b-cda0-47d9-a0b7-ffb7f6a2fca5" id="sch.2-def.closingtime" type="definition">closing time</defterm>, for a call for tenders—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e31ec719-e70e-4107-ab2e-60689e4e619f" id="sch.2-def.closingtime-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for an authority to prospect—see <intref check="valid" refid="sec.35" target.guid="_87b53d9f-6f6c-49a9-ad51-118aa252ae58">section 35</intref><intref check="valid" refid="sec.35-ssec.2" target.guid="_120ae8b4-7377-489d-b475-e040e000f7e2">(2)</intref>(<del xml:space="preserve"><intref check="valid" refid="sec.35-ssec.2-para1.c" target.guid="_741a7736-a835-4b63-82b6-0ac190b2b60e">c)</intref></del><ins xml:space="preserve">f)</ins>; or</txt></block></li><li guid="_cffbf038-55a1-4cfc-856d-ddc2182a7448" id="sch.2-def.closingtime-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for a petroleum lease—see <intref check="valid" refid="sec.127" target.guid="_6a587d42-acca-4fdd-9d32-8061b1e8ce8d">section 127</intref><intref check="valid" refid="sec.127-ssec.2" target.guid="_b1792919-26fe-4492-b0ab-61b6de1e7090">(2)</intref><intref check="valid" refid="sec.127-ssec.2-para1.c" target.guid="_f9a489ea-35e0-4fcd-a6a8-a91ccabbc1b5">(c)</intref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_3ebf122e-94fd-46d9-9646-756b4a65e198" id="sch.2-def.coalexplorationtenement_"><txt break.before="1"><defterm guid="_bcb980fc-9730-4d10-8ecf-6429787244eb" id="sch.2-def.coalexplorationtenement" type="definition">coal exploration tenement</defterm> see <intref check="valid" refid="sec.301" target.guid="_483b350d-4900-4d7d-884b-0c64f62e1652">section 301</intref><intref check="valid" refid="sec.301-ssec.1" target.guid="_3d624ecd-7054-46e8-9d73-c9c51a904aef">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_b89598c0-adca-45e6-a3db-61c3bb9ffde5" id="sch.2-def.coalminingCSGoperatingplant_"><txt break.before="1"><defterm guid="_f4fd3a6f-8920-4299-8e7e-5af4609e5318" id="sch.2-def.coalminingCSGoperatingplant" type="definition">coal mining-CSG operating plant</defterm> see <intref check="valid" refid="sec.671" target.guid="_532966cf-6087-46c8-820d-863a71465356">section 671</intref><intref check="valid" refid="sec.671-ssec.3" target.guid="_cfdfa1cc-71d9-43c4-9f21-d61109bed394">(3)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_5f85de89-17b5-4b12-bb7d-872cd5b43f5c" id="sch.2-def.coalmininglease_"><txt break.before="1"><defterm guid="_0cc6251f-e431-4450-bc7f-f67db0c622bb" id="sch.2-def.coalmininglease" type="definition">coal mining lease</defterm> see <intref check="valid" refid="sec.301" target.guid="_483b350d-4900-4d7d-884b-0c64f62e1652">section 301</intref><intref check="valid" refid="sec.301-ssec.2" target.guid="_0a0cbd39-26e7-4099-9b17-107af1af01ec">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_a7ac1a02-8b05-4589-a04a-1c4954201e7c" id="sch.2-def.CoalMiningSafetyandHealthAct_"><txt break.before="1"><defterm guid="_9647f922-db44-45e8-abbf-114da9142baf" id="sch.2-def.CoalMiningSafetyandHealthAct" type="definition">Coal Mining Safety and Health Act</defterm> means the <legref check="valid" jurisd="QLD" target.doc.id="act-1999-039" target.version.series="aa8f4811-7589-4cef-8731-c79d6cf94546" type="act"><name emphasis="yes">Coal Mining Safety and Health Act 1999</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_7e1a1ffd-ef24-4866-9364-d5e077dc6821" id="sch.2-def.coaloroilshaledevelopmentpreference_"><txt break.before="1"><defterm guid="_9a67f811-d50f-45a8-bc11-f7d05973af5b" id="sch.2-def.coaloroilshaledevelopmentpreference" type="definition">coal or oil shale development preference</defterm> see <intref check="valid" refid="sec.314" target.guid="_59e51d7e-3865-4a05-9438-464af9977aa7">section 314</intref><intref check="valid" refid="sec.314-ssec.3" target.guid="_ac913a8d-fdde-4578-ac98-cf6bd65209e8">(3)</intref><intref check="valid" refid="sec.314-ssec.3-para1.b" target.guid="_96cc6edf-344c-4248-b301-c19644db63ea">(b)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_a9a15724-201b-47fb-b565-c3109530a594" id="sch.2-def.coaloroilshalemininglease_"><txt break.before="1"><defterm guid="_3fa7207e-b290-4910-8956-6acfaa55f75f" id="sch.2-def.coaloroilshalemininglease" type="definition">coal or oil shale mining lease</defterm> means a coal mining lease or oil shale mining lease under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_e216598b-c813-4b22-90cb-63eed1138c46" id="sch.2-def.coaloroilshaleminingtenement_"><txt break.before="1"><defterm guid="_a6085b2f-48ed-4356-aa27-c4e8a0a48055" id="sch.2-def.coaloroilshaleminingtenement" type="definition">coal or oil shale mining tenement</defterm> see <intref check="valid" refid="sec.303" target.guid="_f3bcd040-d2a8-4368-8eef-64194ba4e191">section 303</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_05e22954-1570-4b4a-9083-d570a553b805" id="sch.2-def.coalresourceauthority_"><txt break.before="1"><defterm guid="_ba2fa08e-f1bb-4760-b84c-338576993eb6" id="sch.2-def.coalresourceauthority" type="definition">coal resource authority</defterm>, for <intref check="valid" refid="ch.9" target.guid="_e115e3d8-9707-4c5d-b3e6-be71f8d522ee">chapter 9</intref>, <intref check="valid" refid="ch.9-pt.4" target.guid="_feccc805-854d-490d-9644-dd7ef21961d9">part 4</intref>, <intref check="valid" refid="ch.9-pt.4-div.5" target.guid="_3ccd9143-f883-4790-8d0d-2f2006c5ce9b">division 5</intref>, <intref check="valid" refid="ch.9-pt.4-div.5-sdiv.1" target.guid="_871b13c6-0132-4ee8-8f83-05a6329f2dbf">subdivision 1</intref>, see <intref check="valid" refid="sec.705A" target.guid="_38abe539-5c16-4904-9b11-eaa2a6704baa">section 705A</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_dc9d8b02-9628-4ad1-aa12-85f0a456ab04" id="sch.2-def.coalseamgas_"><txt break.before="1"><defterm guid="_745147de-6e81-498a-8e59-34540043f4d6" id="sch.2-def.coalseamgas" type="definition">coal seam gas</defterm> means petroleum (in any state) occurring naturally—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_99e1d463-b5c5-44ff-a692-a2885b5f42b7" id="sch.2-def.coalseamgas-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in association with coal or oil shale; or</txt></block></li><li guid="_8bb02c43-a254-46c0-bd0f-4de00e626906" id="sch.2-def.coalseamgas-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">in strata associated with coal or oil shale mining.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_a7f8da51-07f6-40dd-be03-defe65221843" id="sch.2-def.commercialviabilityreport_"><txt break.before="1"><defterm guid="_816e7c03-a24e-4bcf-aecf-9faacca9264e" id="sch.2-def.commercialviabilityreport" type="definition">commercial viability report</defterm> see <intref check="valid" refid="sec.230" target.guid="_56d22cd4-53a3-4c93-8714-633209c67ae4">section 230</intref>.</txt></definition><definition affected.by.uncommenced="0" change="del" guid="_58d8cbe8-3846-4a4b-8da2-d13e34b47a7e-del" id="sch.2-def.commissioner_-del"><txt break.before="1"><defterm guid="_aef78fc5-3ad6-4e71-9168-7d1f6f2d36f3-del" id="sch.2-def.commissioner-del" type="definition">commissioner</defterm> means the Commissioner for Mine Safety and Health under the <legref check="valid" jurisd="QLD" target.doc.id="act-1999-039" target.version.series="aa8f4811-7589-4cef-8731-c79d6cf94546" type="act"><name emphasis="yes">Coal Mining Safety and Health Act 1999</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_99174dea-c9c2-4771-ad92-a4c2a79dfe00" id="sch.2-def.CommonProvisionsAct_"><txt break.before="1"><defterm guid="_1ef2ce0f-9a57-4627-b80e-e3884c0daba2" id="sch.2-def.CommonProvisionsAct" type="definition">Common Provisions Act</defterm> means the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="yes">Mineral and Energy Resources (Common Provisions) Act 2014</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_b7580722-5796-4c3c-8a59-44086fb7d224" id="sch.2-def.CommonwealthNativeTitleAct_"><txt break.before="1"><defterm guid="_fa10e655-73bb-4e14-aeb2-2749907bcd38" id="sch.2-def.CommonwealthNativeTitleAct" type="definition">Commonwealth Native Title Act</defterm> means the <legref check="invalid" jurisd="CTH" type="act"><name emphasis="yes">Native Title Act 1993</name> (Cwlth)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_28d309e7-47ab-4375-8a4f-6d992c6f4065" id="sch.2-def.competencyassessment_"><txt break.before="1"><defterm guid="_0faf5929-22e6-4f94-8074-c7f73ad604f1" id="sch.2-def.competencyassessment" type="definition">competency assessment</defterm> see <intref check="valid" refid="sec.653" target.guid="_749057a4-eb92-4df9-8f57-811dd03b03e9">section 653</intref><intref check="valid" refid="sec.653-ssec.1" target.guid="_ea6c2991-cb1a-4f76-9c70-ea8ce464e920">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_6812265c-0c6d-4806-b349-1a54c8dc5f18" id="sch.2-def.competencyassessmentnotice_"><txt break.before="1"><defterm guid="_d3cb5c88-d2b7-4ef5-b4e3-ae07cbc00865" id="sch.2-def.competencyassessmentnotice" type="definition">competency assessment notice</defterm> see <intref check="valid" refid="sec.653" target.guid="_749057a4-eb92-4df9-8f57-811dd03b03e9">section 653</intref><intref check="valid" refid="sec.653-ssec.1" target.guid="_ea6c2991-cb1a-4f76-9c70-ea8ce464e920">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_3656dd0d-4c9b-47cc-bf13-0502322d3cd0" id="sch.2-def.compliancedirection_"><txt break.before="1"><defterm guid="_8230dd1e-dbe9-4b72-85bf-7cf5a2dee7b6" id="sch.2-def.compliancedirection" type="definition">compliance direction</defterm> see <intref check="valid" refid="sec.780" target.guid="_9ab71ef6-c7f8-4004-81cd-446d1a349209">section 780</intref><intref check="valid" refid="sec.780-ssec.2" target.guid="_9edc4374-8f11-4643-9009-1649becac890">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_f2944205-635f-43c1-8558-a34a28c69add" id="sch.2-def.conditions_"><txt break.before="1"><defterm guid="_fed91e44-a146-4225-8e23-f11d24983fc0" id="sch.2-def.conditions" type="definition">conditions</defterm>, of a petroleum authority, see <intref check="valid" refid="sec.20" target.guid="_746e989f-44f2-4d9b-9550-13495b74b131">section 20</intref>.</txt></definition><definition affected.by.uncommenced="0" change="ins" guid="_4ee90863-898c-4dab-a85c-296d27b3c75a" id="sch.2-def.conduct_"><txt break.before="1"><defterm guid="_b5e46963-44e6-4b9b-a04e-3a92354ccebe" id="sch.2-def.conduct" type="definition">conduct</defterm>, for chapter 11, part 1AA, see section 799I(1).</txt></definition><definition affected.by.uncommenced="0" guid="_358f6d03-94d4-4fb8-8670-2fb50251692b" id="sch.2-def.conductandcompensationagreement_"><txt break.before="1"><defterm guid="_583cc50f-f487-4f27-aae8-421ee764f2a2" id="sch.2-def.conductandcompensationagreement" type="definition">conduct and compensation agreement</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.83" target.doc.id="act-2014-047" target.guid="_b5495591-7bb8-436c-b1e9-f3f4bd9f6868" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">section 83</legref><legref check="invalid" jurisd="QLD" type="act">(1)</legref>.</txt></definition><definition affected.by.uncommenced="0" change="del" guid="_e610fc35-9fc4-4e1a-b72d-4971faf20e80-del" id="sch.2-def.conferenceelectionnotice_-del"><txt break.before="1"><defterm guid="_713b1498-c0f3-4546-bd13-385b026a5257-del" id="sch.2-def.conferenceelectionnotice-del" type="definition">conference election notice</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.83A" target.doc.id="act-2014-047" target.guid="_9db33894-d9c2-4a76-8924-c1558a566555" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">section 83A</legref><legref check="invalid" jurisd="QLD" type="act">(2)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_9f936b71-09cd-4587-b0ac-5d095cd58a5d" id="sch.2-def.confidentialinformation_"><txt break.before="1"><defterm guid="_8e09a2f7-33b8-4334-8703-46989ceabdc8" id="sch.2-def.confidentialinformation" type="definition">confidential information</defterm>, for <intref check="valid" refid="ch.6" target.guid="_1179c65a-355e-4281-a616-c3e83927d1e4">chapter 6</intref>, <intref check="valid" refid="ch.6-pt.5" target.guid="_89f29890-11e0-48d3-957e-cf4b610fc40a">part 5</intref>, see <intref check="valid" refid="sec.617A" target.guid="_0a869716-ecec-4789-b1d3-f8e26829d45f">section 617A</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_323f7038-e5a4-477d-9e0f-571de40fd90f" id="sch.2-def.construct_"><txt break.before="1"><defterm guid="_64e200b7-55d5-4ac3-83f0-dd50c13acff0" id="sch.2-def.construct" type="definition">construct</defterm>, a structure, includes placing the structure.</txt></definition><definition affected.by.uncommenced="0" guid="_7c3fc862-6a14-4eec-b612-df2ad016938b" id="sch.2-def.consultationnotice_"><txt break.before="1"><defterm guid="_6cbcb71f-f9d8-4dcc-a5ae-573d840edc07" id="sch.2-def.consultationnotice" type="definition">consultation notice</defterm> see <intref check="valid" refid="sec.465" target.guid="_7d2a1719-f499-4fa2-9703-03414833a7f2">section 465</intref><intref check="valid" refid="sec.465-ssec.1" target.guid="_8c98faf2-df9a-41a9-9da5-50f616c35b5d">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_57a9a7b6-fed4-409e-b2d8-17fd75f10dfe" id="sch.2-def.consultationperiod_"><txt break.before="1"><defterm guid="_f69c4dc0-61b0-4656-8ef4-69c74403541b" id="sch.2-def.consultationperiod" type="definition">consultation period</defterm> see <intref check="valid" refid="sec.465" target.guid="_7d2a1719-f499-4fa2-9703-03414833a7f2">section 465</intref><intref check="valid" refid="sec.465-ssec.2" target.guid="_7070b6af-8a79-4b2e-81af-85ef88a94e32">(2)</intref><intref check="valid" refid="sec.465-ssec.2-para1.c" target.guid="_4dd6e1eb-7590-4313-89f7-dfc7116f66fd">(c)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_3dd8f6a5-0ca8-47e8-a803-e925bec36869" id="sch.2-def.consumer_"><txt break.before="1"><defterm guid="_677ad70b-5a93-439a-bb42-0a1fd1f17126" id="sch.2-def.consumer" type="definition">consumer</defterm>, of fuel gas, see <intref check="valid" refid="sec.619" target.guid="_c36c8bb6-ebaa-41c7-a3d9-2bc5e1596e2d">section 619</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_4fc6c107-129d-4b4a-af8c-39b214fda3a9" id="sch.2-def.contiguous_"><txt break.before="1"><defterm guid="_8cf87147-8163-4a33-a808-4bc98667cf38" id="sch.2-def.contiguous" type="definition">contiguous</defterm>, in relation to land, means abutting, with at least 1 side in common.</txt></definition><definition affected.by.uncommenced="0" guid="_75eeb219-03dd-4e3f-81a2-4693c8fa5ac2" id="sch.2-def.controller_"><txt break.before="1"><defterm guid="_258e522f-b0b5-4df9-b148-bbd92b2f04ed" id="sch.2-def.controller" type="definition">controller</defterm>, of a meter, see <intref check="valid" refid="sec.632" target.guid="_681e405b-7ac3-4e4c-b528-5f93db61c35e">section 632</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_ecb0da00-2e25-4381-93ad-e49af5ee141d" id="sch.2-def.convertedpetroleumtenure_"><txt break.before="1"><defterm guid="_fafa07c8-205d-4f4f-8548-c642f4d2a2bf" id="sch.2-def.convertedpetroleumtenure" type="definition">converted petroleum tenure</defterm> see <intref check="valid" refid="sec.872" target.guid="_2f17cfcb-ff78-4906-9656-cc26d8685e32">section 872</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_db9999a3-5907-4072-a491-2ce4c70dd5b0" id="sch.2-def.conviction_"><txt break.before="1"><defterm guid="_28f0a8d2-335b-483f-8a5e-a23dbcbf418d" id="sch.2-def.conviction" type="definition">conviction</defterm> includes a finding of guilt, or the acceptance of a plea of guilty, by a court, whether or not a conviction is recorded.</txt></definition><definition affected.by.uncommenced="0" guid="_e2960e42-f7c4-48c3-8171-c3e1462687d5" id="sch.2-def.coordinatedproject_"><txt break.before="1"><defterm guid="_21fb6ff6-9f63-451c-933a-5dc280f43faf" id="sch.2-def.coordinatedproject" type="definition">coordinated project</defterm> means a project declared under the <legref check="valid" jurisd="QLD" target.doc.id="act-1971-055" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" type="act"><name emphasis="no">State Development Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.26" target.doc.id="act-1971-055" target.guid="_f88eb85e-bd2a-49ff-9d2d-83da4cfa8fdf" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" type="act">section 26</legref>, to be a coordinated project.</txt></definition><definition affected.by.uncommenced="0" guid="_66ab7fab-7264-4c8c-b166-dbdd6175933b" id="sch.2-def.coordinationarrangement_"><txt break.before="1"><defterm guid="_fd5d0136-345c-4398-b70a-5b200b8e25b9" id="sch.2-def.coordinationarrangement" type="definition">coordination arrangement</defterm> means an arrangement under <intref check="valid" refid="sec.234" target.guid="_833f730f-e87f-4f59-9210-6dce92c940d2">section 234</intref> that, under <intref check="valid" refid="sec.236" target.guid="_da492eff-cedb-409e-80b0-b0942ccef9b8">section 236</intref>, has taken effect.</txt></definition><definition affected.by.uncommenced="0" guid="_8c09607c-9c64-4e9f-a0c0-0aa2bdedcb54" id="sch.2-def.CoordinatorGeneral_"><txt break.before="1"><defterm guid="_aca233de-dfe3-4067-ac1a-4401342382ae" id="sch.2-def.CoordinatorGeneral" type="definition">Coordinator-General</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-1971-055" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" type="act"><name emphasis="no">State Development Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sch.2" target.doc.id="act-1971-055" target.guid="_c42852da-0ebd-489e-af32-d81f601a3ac1" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" type="act">schedule 2</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_45424e4f-d993-41fe-b25a-92eeb10b2b32" id="sch.2-def.CoordinatorGeneralsconditions_"><txt break.before="1"><defterm guid="_6041ad32-de0c-421a-ab50-32c2001d2e9d" id="sch.2-def.CoordinatorGeneralsconditions" type="definition">Coordinator-General’s conditions</defterm>, for a lease or licence or proposed lease or licence for a coordinated project, means the conditions for the lease or licence stated in the Coordinator-General’s report for the project.</txt></definition><definition affected.by.uncommenced="0" guid="_7d31142f-f5df-4d4c-bb14-9da281c67bfa" id="sch.2-def.CoordinatorGeneralsreport_"><txt break.before="1"><defterm guid="_1a64b419-c1c7-4788-a7d5-a086cfc74fd4" id="sch.2-def.CoordinatorGeneralsreport" type="definition">Coordinator-General’s report</defterm>, for a coordinated project, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_252b6117-b409-48ed-b5a9-eb8069c15fee" id="sch.2-def.CoordinatorGeneralsreport-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if an EIS was prepared under the <legref check="valid" jurisd="QLD" target.doc.id="act-1971-055" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" type="act"><name emphasis="no">State Development Act</name></legref> for the project—the Coordinator-General’s report for the EIS prepared under the <legref check="valid" jurisd="QLD" target.doc.id="act-1971-055" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" type="act"><name emphasis="no">State Development Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.34D" target.doc.id="act-1971-055" target.guid="_7a674e1f-2d3e-498f-b466-f0fd7f8d978f" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" type="act">section 34D</legref>; or</txt></block></li><li guid="_20c5254e-7e9a-45f0-92a9-bda977d27333" id="sch.2-def.CoordinatorGeneralsreport-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if an IAR was prepared under the <legref check="valid" jurisd="QLD" target.doc.id="act-1971-055" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" type="act"><name emphasis="no">State Development Act</name></legref> for the project—the Coordinator-General’s report for the IAR prepared under the <legref check="valid" jurisd="QLD" target.doc.id="act-1971-055" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" type="act"><name emphasis="no">State Development Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.34L" target.doc.id="act-1971-055" target.guid="_4dadba86-8e70-4d9a-b09a-60197ec7e69c" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" type="act">section 34L</legref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_75b2dc35-e9a6-44d5-baca-eff97d904abf" id="sch.2-def.costs_"><txt break.before="1"><defterm guid="_d063d76e-2dbb-4af5-94b8-e5f2e08dd6cd" id="sch.2-def.costs" type="definition">costs</defterm>, incurred by the State, includes the cost of services that the State provides for itself.</txt></definition><definition affected.by.uncommenced="0" guid="_d20f4b1c-9178-4adf-a91d-c4defda8a272" id="sch.2-def.CSGassessmentcriteria_"><txt break.before="1"><defterm guid="_d3fb9429-2359-430f-810a-a0467c135fe7" id="sch.2-def.CSGassessmentcriteria" type="definition">CSG assessment criteria</defterm> see <intref check="valid" refid="sec.305" target.guid="_f8a0d070-7bc2-4125-8d40-9e466d7983f8">section 305</intref><intref check="valid" refid="sec.305-ssec.1" target.guid="_70b8c943-5f80-451b-80db-9dfb144af0f0">(1)</intref><intref check="valid" refid="sec.305-ssec.1-para1.b" target.guid="_be4c97c0-3363-4c2a-837e-70ee6577372f">(b)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_47ed7353-d7cf-473b-ab22-2d3920c3a469" id="sch.2-def.CSGstatement_"><txt break.before="1"><defterm guid="_8dd7c08f-72f8-466f-8ba9-d73bed616759" id="sch.2-def.CSGstatement" type="definition">CSG statement</defterm> see <intref check="valid" refid="sec.305" target.guid="_f8a0d070-7bc2-4125-8d40-9e466d7983f8">section 305</intref><intref check="valid" refid="sec.305-ssec.1" target.guid="_70b8c943-5f80-451b-80db-9dfb144af0f0">(1)</intref><intref check="valid" refid="sec.305-ssec.1-para1.a" target.guid="_3ba6572c-d77e-4e66-9816-13819a493644">(a)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_856299f4-7ab4-4088-baf9-4d4297176637" id="sch.2-def.CSGwater_"><txt break.before="1"><defterm guid="_4d1ea9ce-625a-48a6-a059-0b65d73fecdc" id="sch.2-def.CSGwater" type="definition">CSG water</defterm> means underground water brought to the surface of the earth in connection with exploring for or producing coal seam gas under a petroleum tenure.</txt></definition><definition affected.by.uncommenced="0" guid="_87a4af7d-6dd9-48ef-9bc3-a11e68010f86" id="sch.2-def.currentowner_"><txt break.before="1"><defterm guid="_a474f485-ffb8-42fc-975f-f0451b99c519" id="sch.2-def.currentowner" type="definition">current owner</defterm>, of stored petroleum or a prescribed storage gas, see <intref check="valid" refid="sec.220" target.guid="_01a5405c-1ab3-471a-91c5-5e1a69e6222e">section 220</intref><intref check="valid" refid="sec.220-ssec.2" target.guid="_1249e861-95e0-4bb6-a5fc-4951d4708de0">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" change="del" guid="_1bf057a3-dcee-4833-a94f-e30ad516aa45-del" id="sch.2-def.currentworkprogram_-del"><txt break.before="1"><defterm guid="_35dc4361-bf8b-4b09-b04f-5909fcc50e79-del" id="sch.2-def.currentworkprogram-del" type="definition">current work program</defterm>, for <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.1" target.guid="_ae224c28-0e3b-4475-a663-d926bb3b8358">part 1</intref>, <intref check="valid" refid="ch.2-pt.1-div.3" target.guid="_68a7a1d9-c152-465c-9d27-7eebd1ad4060">division 3</intref>, <intref check="valid" refid="ch.2-pt.1-div.3-sdiv.7" target.guid="_3cb48cda-44fd-4f32-a505-08926bf73a10">subdivision 7</intref>, includes a later work program that, before the commencement of the subdivision, had been lodged under <intref check="valid" refid="sec.79" target.guid="_4d70b3fa-ec85-47d0-8263-be87e6884f18">section 79</intref> and, after the commencement, approved.</txt></definition><definition affected.by.uncommenced="0" guid="_afd92980-0cdb-4c90-b541-d2fac8dec727" id="sch.2-def.dangeroussituation_"><txt break.before="1"><defterm guid="_ff9dd59a-9a77-48d3-aaac-bb1567a68831" id="sch.2-def.dangeroussituation" type="definition">dangerous situation</defterm> means a situation relating to petroleum or fuel gas, a geothermal activity or a GHG stream in which an inspector reasonably believes an imminent risk of material harm to persons or property is likely if action is not taken to avoid, eliminate or minimise the risk.</txt></definition><definition affected.by.uncommenced="0" guid="_4922532a-8873-475a-a5bd-c9959baffa74" id="sch.2-def.dangeroussituationdirection_"><txt break.before="1"><defterm guid="_f3a67f97-3b2e-4571-aaaa-d91972f88123" id="sch.2-def.dangeroussituationdirection" type="definition">dangerous situation direction</defterm> see <intref check="valid" refid="sec.783" target.guid="_219e4d39-b97d-4752-b46f-0061368a8c01">section 783</intref><intref check="valid" refid="sec.783-ssec.2" target.guid="_df13a876-d6ea-4821-8d73-98549a36bda0">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_995a53f3-e99d-45ee-98bf-706cfb1d7fe6" id="sch.2-def.dataacquisitionactivities_"><txt break.before="1"><defterm guid="_461b71d0-6fb9-46c7-9713-5eb496660389" id="sch.2-def.dataacquisitionactivities" type="definition">data acquisition activities</defterm> see <intref check="valid" refid="sec.176" target.guid="_ea0eaf24-065e-4c96-bcc8-ce7ae7ea65af">section 176</intref><intref check="valid" refid="sec.176-ssec.1" target.guid="_92dd81c0-4533-4419-b717-7ede0d0d2c3f">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_9f8b0ffb-9c78-437b-a7b1-204efb979b63" id="sch.2-def.dataacquisitionauthority_"><txt break.before="1"><defterm guid="_49b40fd8-3185-494c-b350-eac77b0aa165" id="sch.2-def.dataacquisitionauthority" type="definition">data acquisition authority</defterm> see <intref check="valid" refid="sec.18" target.guid="_00606342-13a2-49f5-a337-6c1f809e1f2e">section 18</intref><intref check="valid" refid="sec.18-ssec.1" target.guid="_b50a8cff-43ef-47e2-9531-603839cf5b0c">(1)</intref><intref check="valid" refid="sec.18-ssec.1-para1.c" target.guid="_128e1318-332d-471c-a82a-5d3280f6bddf">(c)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_ad626be3-0a7d-4598-891c-e8a306ce8bd4" id="sch.2-def.dealing_"><txt break.before="1"><defterm guid="_fda1df56-c028-4b36-8230-54f7139c46f7" id="sch.2-def.dealing" type="definition">dealing</defterm>, in relation to a petroleum authority, means a dealing with a resource authority, under the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, that is a petroleum authority.</txt></definition><definition affected.by.uncommenced="0" guid="_fbab3950-3d6d-48d5-87cd-c85f553e6d5e" id="sch.2-def.defaultassessment_"><txt break.before="1"><defterm guid="_161a0199-b41c-47d5-86d7-5dea68cfcd17" id="sch.2-def.defaultassessment" type="definition">default assessment</defterm>, for <intref check="valid" refid="ch.6" target.guid="_1179c65a-355e-4281-a616-c3e83927d1e4">chapter 6</intref>, see <intref check="valid" refid="sec.599B" target.guid="_a99d5642-6587-43be-96be-2d35aafa7b5d">section 599B</intref><intref check="valid" refid="sec.599B-ssec.2" target.guid="_6ca37678-a517-4244-a90f-1e2a36d7500d">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_2074c08b-108e-40c2-8353-284d1c862dcd" id="sch.2-def.deferralagreement_"><txt break.before="1"><defterm guid="_39cb8b29-18e4-42c1-92d0-c2c5ae66543b" id="sch.2-def.deferralagreement" type="definition">deferral agreement</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.44" target.doc.id="act-2014-047" target.guid="_1e94ecd4-429c-490c-99b9-2ac3fcae69a8" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">section 44</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_51864d4c-e2fd-4aac-9303-96853a950151" id="sch.2-def.developmentplan_"><txt break.before="1"><defterm guid="_387f5092-c4d3-494b-aceb-0aafcbec7938" id="sch.2-def.developmentplan" type="definition">development plan</defterm>, for a petroleum lease, see <intref check="valid" refid="sec.24" target.guid="_85995781-9df6-4f8f-a0c8-0e7772a28e9f">section 24</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_9349cd89-cae5-4a04-828b-5c1c0acaf085" id="sch.2-def.developmentplancriteria_"><txt break.before="1"><defterm guid="_bd6058f1-3158-4d10-b2a6-4d173da00d88" id="sch.2-def.developmentplancriteria" type="definition">development plan criteria</defterm> see <intref check="valid" refid="sec.141" target.guid="_822fc439-554a-4f95-85ee-d8b83b540c4d">section 141</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_1590728d-1ddb-47cc-88dc-e9bff14625eb" id="sch.2-def.distributionpipeline_"><txt break.before="1"><defterm guid="_74c78b9c-9b51-4fe7-b96d-56f21ba3d3d0" id="sch.2-def.distributionpipeline" type="definition">distribution pipeline</defterm> see <intref check="valid" refid="sec.16A" target.guid="_c49460ee-031d-4fa2-8122-5455e3508622">section 16A</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_98589273-1663-4ba2-a842-fff0fd0ed9e0" id="sch.2-def.distributionsystem_"><txt break.before="1"><defterm guid="_b8bf770f-7c68-4678-84b8-a436508880ec" id="sch.2-def.distributionsystem" type="definition">distribution system</defterm> means a system of distribution pipelines and meters and other equipment used in the supply of fuel gas to more than 1 consumer within a fuel gas market, but does not include—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_551f16ed-9371-4c72-a402-e88fbf5f6985" id="sch.2-def.distributionsystem-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">pipelines connected from the exit point of a meter installed for a consumer’s premises; or</txt></block></li><li guid="_ac3f8428-a8bd-492d-902c-63323468ed15" id="sch.2-def.distributionsystem-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">appliances or equipment connected to pipelines mentioned in <intref check="valid" refid="sch.2-def.distributionsystem-para1.a" target.guid="_551f16ed-9371-4c72-a402-e88fbf5f6985">paragraph (a)</intref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_8901c1bb-e340-457f-ab49-529385d9844c" id="sch.2-def.domesticpurposes_"><txt break.before="1"><defterm guid="_6793e910-5824-42cd-854b-838055b32a27" id="sch.2-def.domesticpurposes" type="definition">domestic purposes</defterm> includes irrigating a garden, not exceeding 0.25ha, being a garden cultivated for domestic use and not for the sale, barter or exchange of goods produced in the garden.</txt></definition><definition affected.by.uncommenced="0" guid="_c2cd210e-6c00-42f1-b2be-4ca43e296e7f" id="sch.2-def.drill_"><txt break.before="1"><defterm guid="_f7338c6b-37e4-4c28-9fa5-1368dab65773" id="sch.2-def.drill" type="definition">drill</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_eca58d1d-76ac-4f5b-97fe-65b9618d030c" id="sch.2-def.drill-para1.1" provision.type="other"><no>1</no><block><txt break.before="0"><defterm guid="_5abe3747-46e3-42e7-aad1-2fef29d4f178" type="mention">drill</defterm> includes to bore.</txt></block></li><li guid="_1c10720b-a549-4eae-9e33-bcbaaa4fa379" id="sch.2-def.drill-para1.2" provision.type="other"><no>2</no><block><txt break.before="0"><defterm guid="_37a758ee-583a-4ffe-b473-4b4ee28bf5a1" type="mention">drill</defterm>, a water supply bore, includes excavating the bore.</txt></block></li></list></definition><definition affected.by.uncommenced="0" change="del" guid="_d9a51673-2a84-4fc8-a64e-789e797b9351-del" id="sch.2-def.eligibleclaimant_-del"><txt break.before="1"><defterm guid="_6d8bdfe6-d300-4277-934d-b77f2e30c1ca-del" id="sch.2-def.eligibleclaimant-del" type="definition">eligible claimant</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.81" target.doc.id="act-2014-047" target.guid="_a86cb34d-af6f-4d62-a426-415980d58775" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">section 81</legref><legref check="invalid" jurisd="QLD" type="act">(1)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_462cc35e-b989-4f0d-aefd-f43e9d2a4977" id="sch.2-def.eligibleperson_"><txt break.before="1"><defterm guid="_8b40d720-882f-4aa7-8800-c86575f1423a" id="sch.2-def.eligibleperson" type="definition">eligible person</defterm> see <intref check="valid" refid="sec.19" target.guid="_6a5ab8f1-7066-40fa-a529-faf109917dea">section 19</intref>.</txt></definition><definition affected.by.uncommenced="0" change="ins" guid="_71d639c9-bc6f-4192-b319-c54615535413" id="sch.2-def.employer_"><txt break.before="1"><defterm guid="_0303cca8-a50d-4f41-9ac3-4e8ee3c17826" id="sch.2-def.employer" type="definition">employer</defterm>, for an operating plant or gas work, for chapter 11, part 1AA, see section 799I(1).</txt></definition><definition affected.by.uncommenced="0" guid="_12ccf2fb-96b2-497d-9b4b-7f6755cd9e07" id="sch.2-def.enddate_"><txt break.before="1"><defterm guid="_dd9e2fb1-8f4e-4af3-857e-b1c03764c8b8" id="sch.2-def.enddate" type="definition">end date</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f067c9c8-3131-425a-822b-87bbebb3d53b" id="sch.2-def.enddate-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for ATP production testing or PL production testing for a petroleum well means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5a785ee1-d0a9-44aa-be57-33147d718ca4" id="sch.2-def.enddate-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">if the petroleum well intersects a natural underground reservoir containing coal seam gas, shale gas, tight gas or basin-centred gas and the testing relates to petroleum produced from the reservoir—the day that is 13 months from when the testing first starts; or</txt></block></li><li guid="_d45a1168-da38-461f-b63a-5c9b700fb0e9" id="sch.2-def.enddate-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">otherwise—the day that is 6 months from when the testing first starts; or</txt></block></li></list></block></li><li guid="_132899ea-dae3-4336-8e72-74e8c8093c9e" id="sch.2-def.enddate-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for ATP storage testing or PL storage testing, means the day that is 6 months from when the testing first starts.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_ea93cd89-49fd-40ff-900e-b1fe7337eadf" id="sch.2-def.endpoints_"><txt break.before="1"><defterm guid="_2f6cce01-7a42-42ef-b92d-2016283e6940" id="sch.2-def.endpoints" type="definition">end points</defterm>, for a pipeline, see <intref check="valid" refid="sec.16" target.guid="_78b3e1f4-de3e-4047-b212-fc9d0c03967e">section 16</intref><intref check="valid" refid="sec.16-ssec.3" target.guid="_8b1a4dc0-dec3-4d45-954a-edc0c0215c87">(3)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_8ba581e6-b48e-49da-babf-bc67fa3bcde2" id="sch.2-def.enter_"><txt break.before="1"><defterm guid="_e376d1e4-bdb6-4601-bd0f-985bdf0bc3e1" id="sch.2-def.enter" type="definition">enter</defterm> a place includes the exercise of the rights in relation to the place under <intref check="valid" refid="sec.854" target.guid="_e4595563-305d-4359-bade-c23e1814d87e">section 854</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_4c2ed7ec-0a61-48a9-b107-dc6173a89285" id="sch.2-def.EnvironmentalProtectionAct_"><txt break.before="1"><defterm guid="_33ae0fd3-ec02-4693-8539-7ba2ec26b6a1" id="sch.2-def.EnvironmentalProtectionAct" type="definition">Environmental Protection Act</defterm> means the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act"><name emphasis="yes">Environmental Protection Act 1994</name></legref>.</txt></definition><definition affected.by.uncommenced="0" change="ins" guid="_f38fff30-994f-401c-a7e9-ec6c577292f4" id="sch.2-def.exceptionalevent_"><txt break.before="1"><defterm guid="_215542e6-129d-4753-af63-75c38bc9b414" id="sch.2-def.exceptionalevent" type="definition">exceptional event</defterm>, affecting an authority to prospect—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_892a51f2-a97b-4883-8421-4a72a4b879b5" id="sch.2-def.exceptionalevent-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">means an event that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_607b84a4-7be5-4cd0-a824-4a0bf82c1591" id="sch.2-def.exceptionalevent-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">affects the carrying out of authorised activities under the authority; and</txt></block></li><li guid="_b9c3c90a-64f3-4ef2-9a06-1edb0e1402e0" id="sch.2-def.exceptionalevent-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">is beyond the control of the holder of the authority; and</txt></block></li><li guid="_b19ffaee-1f97-4a85-b580-b724804d231b" id="sch.2-def.exceptionalevent-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">could not reasonably have been prevented by the holder of the authority; and</txt></block></li></list></block></li><li guid="_f3b60826-17f4-44fb-b721-c4b3d4fb65f4" id="sch.2-def.exceptionalevent-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">does not include a takeover bid under the <legref check="unknown" jurisd="CTH" type="act"><name emphasis="no">Corporations Act</name></legref>, chapter 6 made or proposed by another entity in relation to the holder of the authority. </txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_5cf9acd6-f66f-4b55-9649-fefa69e87066" id="sch.2-def.excludedland_"><txt break.before="1"><defterm guid="_123eb9ee-d4f5-4514-ad06-dda1752a056c" id="sch.2-def.excludedland" type="definition">excluded land</defterm> for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f2315c2d-6df6-482d-b766-47c0d9a34f06" id="sch.2-def.excludedland-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">an authority to prospect—means excluded land for the authority, decided under <intref check="valid" refid="sec.99" target.guid="_f62b657c-aab4-4609-b4fb-1563f8df8dfb">section 99</intref>; or</txt></block></li><li guid="_15e573d6-9ea4-460e-b8eb-6459b47381a6" id="sch.2-def.excludedland-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a petroleum lease—means excluded land for the lease, decided under <intref check="valid" refid="sec.169" target.guid="_bef303e4-aef4-40e0-ab7b-a57a6df9306e">section 169</intref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_f9686b11-9953-4ace-8fec-19379409696c" id="sch.2-def.executiveofficer_"><txt break.before="1"><defterm guid="_54cb1a6f-d5c1-4b0a-9959-eb6e4be23d61" id="sch.2-def.executiveofficer" type="definition">executive officer</defterm>, of a corporation, means a person who is concerned with, or takes part in, its management, whether or not the person is a director or the person’s position is given the name of executive officer.</txt></definition><definition affected.by.uncommenced="0" guid="_3a1df7e3-4b7c-405f-97d3-017f5466f4ba" id="sch.2-def.executivesafetymanager_"><txt break.before="1"><defterm guid="_6929f8f5-2a70-4936-ae8c-51dfbfc4235e" id="sch.2-def.executivesafetymanager" type="definition">executive safety manager</defterm>, of an operating plant, see <intref check="valid" refid="sec.687" target.guid="_efc82e86-c2c8-449e-a4ad-0d7bd783d87d">section 687</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_104f4f52-da3e-4857-bae5-b249aab241ae" id="sch.2-def.existinguser_"><txt break.before="1"><defterm guid="_2259e3ac-79a0-49ca-92e4-03e78779a51f" id="sch.2-def.existinguser" type="definition">existing user</defterm>, of a natural underground reservoir, see <intref check="valid" refid="sec.205" target.guid="_1dd78fc2-6141-470d-82bd-df983ee8748d">section 205</intref><intref check="valid" refid="sec.205-ssec.1" target.guid="_dc28d74f-ce8c-416b-9578-91f426a71301">(1)</intref> and <intref check="valid" refid="sec.205-ssec.6" target.guid="_a57003ac-3b05-4753-97ca-5e8c68f4d86f">(6)</intref>.</txt></definition><definition affected.by.uncommenced="0" change="ins" guid="_d44fb5e3-d08c-4dd2-bc22-1954af172435" id="sch.2-def.explorationproject_"><txt break.before="1"><defterm guid="_29409873-0307-464c-ad74-9316f551a7af" id="sch.2-def.explorationproject" type="definition">exploration project</defterm> means a project involving 2 or more authorities to prospect that have a unifying exploration purpose.</txt></definition><definition affected.by.uncommenced="0" guid="_df4a1368-dd4d-4411-a58a-c177f15debca" id="sch.2-def.exploring_"><txt break.before="1"><defterm guid="_4ef00127-01a5-4493-89e5-e4f06b505bda" id="sch.2-def.exploring" type="definition">exploring</defterm>, for petroleum, see <intref check="valid" refid="sec.14" target.guid="_27e70f0e-91ad-4518-9592-7e100347f361">section 14</intref>.</txt></definition><definition affected.by.uncommenced="0" change="del" guid="_9528573a-9709-4749-a8c5-1fd3267bc195-del" id="sch.2-def.extendedremainingperiod_-del"><txt break.before="1"><defterm guid="_0ead0376-b9ba-4ebb-b130-5cb42644cbde-del" id="sch.2-def.extendedremainingperiod-del" type="definition">extended remaining period</defterm>, for a work program, means the remaining time of the program period for the work program as extended under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.1" target.guid="_ae224c28-0e3b-4475-a663-d926bb3b8358">part 1</intref>, <intref check="valid" refid="ch.2-pt.1-div.3" target.guid="_68a7a1d9-c152-465c-9d27-7eebd1ad4060">division 3</intref>, <intref check="valid" refid="ch.2-pt.1-div.3-sdiv.7" target.guid="_3cb48cda-44fd-4f32-a505-08926bf73a10">subdivision 7</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_61f0c64f-666c-4f9a-9410-b6647816918f" id="sch.2-def.externalreview_"><txt break.before="1"><defterm guid="_a3866296-0712-4bda-905b-707b44fbf71d" id="sch.2-def.externalreview" type="definition">external review</defterm>, for a decision, means a review of the decision by QCAT under the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-023" target.version.series="c51aec25-167d-4389-82a2-012d28089e17" type="act"><name emphasis="no">QCAT Act</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_5c7bfe4a-7759-4472-989c-fffddfed6728" id="sch.2-def.fee_"><txt break.before="1"><defterm guid="_a6c8a341-fc70-4b73-8c05-b116c746b1fc" id="sch.2-def.fee" type="definition">fee</defterm> includes tax.</txt></definition><definition affected.by.uncommenced="0" guid="_bde8ca2a-bf8c-4c8a-92a8-155cac51891b" id="sch.2-def.formedroad_"><txt break.before="1"><defterm guid="_fc46abd5-2ea2-4dfb-82fc-9327582796bb" id="sch.2-def.formedroad" type="definition">formed road</defterm> means any existing road or track on private or public land used, or that may be reasonably be capable of being used, to drive or ride motor vehicles.</txt></definition><definition affected.by.uncommenced="0" guid="_d7f23ea5-923d-4862-b560-af78fd201211" id="sch.2-def.formertenureorauthority_"><txt break.before="1"><defterm guid="_713c4584-5a2b-414c-b617-fdbba22f660f" id="sch.2-def.formertenureorauthority" type="definition">former tenure or authority</defterm>, for an abandoned operating plant, for <intref check="valid" refid="ch.10" target.guid="_c24d1b74-938d-44f7-b0f2-d23cd9205275">chapter 10</intref>, <intref check="valid" refid="ch.10-pt.3" target.guid="_ab9c9b86-73cb-4fe7-8c14-ab67d64b2ca8">part 3</intref>, see <intref check="valid" refid="sec.799B" target.guid="_64f3af6d-5b3f-4fb5-99d5-00bc8c6a6867">section 799B</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_31c90498-d470-4e9e-b2ed-9b439daa1331" id="sch.2-def.fuelgas_"><txt break.before="1"><defterm guid="_ed848dcb-e4f6-4185-9516-e4cbd37642cd" id="sch.2-def.fuelgas" type="definition">fuel gas</defterm> see <intref check="valid" refid="sec.11" target.guid="_c9cf5fe6-8bf6-4377-8158-7ec71eb91206">section 11</intref><intref check="valid" refid="sec.11-ssec.2" target.guid="_5d05a89f-cbe7-47c7-bb0b-5ea39a0494d3">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" change="ins" guid="_de8fa238-b845-47a0-a653-452e6da54fa2" id="sch.2-def.fuelgasdeliverynetwork_"><txt break.before="1"><defterm guid="_e9a162b2-b1bd-4c4b-890e-1aae69b6a7a4" id="sch.2-def.fuelgasdeliverynetwork" type="definition">fuel gas delivery network</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cde773c0-fca1-4743-bfbc-ed939c8bb481" id="sch.2-def.fuelgasdeliverynetwork-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">means the supply of fuel gas to or in a container owned or provided (other than by being sold) by a person (a <defterm guid="_ef5e1a47-ef69-4094-97f5-c33108ae5e0d" id="sch.2-def.fuelgasdeliverynetwork-def.productsupplier" type="definition">product supplier</defterm>) to a consumer or another person in the business of distributing fuel gas; and</txt></block></li><li guid="_031b3155-d31a-4d61-a4cd-162ce530dc8b" id="sch.2-def.fuelgasdeliverynetwork-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">includes an activity that is part of or incidental to the supply mentioned in paragraph (a) that is carried out by the product supplier or the product supplier’s agent.</txt></block></li></list><note guid="_1915a618-679f-4d1a-8b75-731e7a93062f" id="sch.2-def.fuelgasdeliverynetwork-note" type="example"><heading guid="_0a9cc033-25d1-4f6a-9c8a-93d4ec6797e8" id="sch.2-def.fuelgasdeliverynetwork-note-he">Examples of fuel gas delivery networks—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_b923f503-23b8-473a-a81e-702f7f310f38" id="sch.2-def.fuelgasdeliverynetwork-note-para1" provision.type="other"><no>•</no><block><txt break.before="0">the delivery of cylinders of fuel gas to a consumer or to a distributor</txt></block></li><li guid="_f259fbd9-2e6b-40a4-8a62-53f7d086fc1d" id="sch.2-def.fuelgasdeliverynetwork-note-para1-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">the filling and storing of cylinders of fuel gas, including cages of 4kg and 8.5kg exchange cylinders</txt></block></li><li guid="_d7cfc23e-23aa-404b-8537-dfb4e7f06de7" id="sch.2-def.fuelgasdeliverynetwork-note-para1-oc.3" provision.type="other"><no>•</no><block><txt break.before="0">the bulk delivery of fuel gas to a container</txt></block></li><li guid="_25da6991-0615-412e-815a-7603b6010733" id="sch.2-def.fuelgasdeliverynetwork-note-para1-oc.4" provision.type="other"><no>•</no><block><txt break.before="0">the filling of a tanker for delivery of fuel gas</txt></block></li><li guid="_d41e326c-0a9b-4f6b-aedf-5a79c9e1e46a" id="sch.2-def.fuelgasdeliverynetwork-note-para1-oc.5" provision.type="other"><no>•</no><block><txt break.before="0">the maintenance of containers and storage equipment used for the supply of fuel gas</txt></block></li><li guid="_c719208e-812d-4332-8286-65a9c826cdd8" id="sch.2-def.fuelgasdeliverynetwork-note-para1-oc.6" provision.type="other"><no>•</no><block><txt break.before="0">the dispensing of fuel gas to vehicles</txt></block></li></list></block></note></definition><definition affected.by.uncommenced="0" guid="_110890ff-71d3-4d4a-ac21-683edc1ed213" id="sch.2-def.fuelgasrefrigerationdevice_"><txt break.before="1"><defterm guid="_7012f9f0-002c-45b7-a5e6-6006d0120aee" id="sch.2-def.fuelgasrefrigerationdevice" type="definition">fuel gas refrigeration device</defterm> means a device—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_722d3eb4-9759-4edd-a5b1-3cb259bda42e" id="sch.2-def.fuelgasrefrigerationdevice-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">that is used or designed or intended for use for refrigeration; and</txt></block></li><li guid="_bbd25ff3-70d4-46e5-8c3e-732f8eea3e1a" id="sch.2-def.fuelgasrefrigerationdevice-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for which fuel gas is the refrigerant.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_79d81f1d-7b77-48ea-a836-20b0b719ee24" id="sch.2-def.garnishee_"><txt break.before="1"><defterm guid="_8366b0c9-d70f-450e-8a56-db695de443b7" id="sch.2-def.garnishee" type="definition">garnishee</defterm>, for <intref check="valid" refid="ch.6" target.guid="_1179c65a-355e-4281-a616-c3e83927d1e4">chapter 6</intref>, <intref check="valid" refid="ch.6-pt.3" target.guid="_043c7be5-9f1a-4efb-93f0-334493cf7967">part 3</intref>, <intref check="valid" refid="ch.6-pt.3-div.2" target.guid="_a37c41c1-27bf-4f02-9771-f9acc51efd1d">division 2</intref>, see <intref check="valid" refid="sec.604AD" target.guid="_74ca95c0-0268-481e-af87-18a71ef6cb4f">section 604AD</intref><intref check="valid" refid="sec.604AD-ssec.1" target.guid="_2f802e34-1993-46d5-a5ad-9b3478409890">(1)</intref><intref check="valid" refid="sec.604AD-ssec.1-para1.b" target.guid="_dc949a5e-7c8e-4612-9c0b-234184673d07">(b)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_e7cc6657-860f-4deb-940b-27fb92a90b92" id="sch.2-def.garnisheeamount_"><txt break.before="1"><defterm guid="_85984515-4640-46cf-9dcf-65c7303de574" id="sch.2-def.garnisheeamount" type="definition">garnishee amount</defterm>, for <intref check="valid" refid="ch.6" target.guid="_1179c65a-355e-4281-a616-c3e83927d1e4">chapter 6</intref>, <intref check="valid" refid="ch.6-pt.3" target.guid="_043c7be5-9f1a-4efb-93f0-334493cf7967">part 3</intref>, <intref check="valid" refid="ch.6-pt.3-div.2" target.guid="_a37c41c1-27bf-4f02-9771-f9acc51efd1d">division 2</intref>, see <intref check="valid" refid="sec.604AD" target.guid="_74ca95c0-0268-481e-af87-18a71ef6cb4f">section 604AD</intref><intref check="valid" refid="sec.604AD-ssec.3" target.guid="_249157d2-0362-476c-96ff-ac3d783d910e">(3)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_9cb3a93d-ab0b-49b9-9046-3f992043a37c" id="sch.2-def.garnisheenotice_"><txt break.before="1"><defterm guid="_b868ab9f-785b-48b8-a923-2b55ce6ab5fa" id="sch.2-def.garnisheenotice" type="definition">garnishee notice</defterm>, for <intref check="valid" refid="ch.6" target.guid="_1179c65a-355e-4281-a616-c3e83927d1e4">chapter 6</intref>, <intref check="valid" refid="ch.6-pt.3" target.guid="_043c7be5-9f1a-4efb-93f0-334493cf7967">part 3</intref>, <intref check="valid" refid="ch.6-pt.3-div.2" target.guid="_a37c41c1-27bf-4f02-9771-f9acc51efd1d">division 2</intref>, see <intref check="valid" refid="sec.604AD" target.guid="_74ca95c0-0268-481e-af87-18a71ef6cb4f">section 604AD</intref><intref check="valid" refid="sec.604AD-ssec.3" target.guid="_249157d2-0362-476c-96ff-ac3d783d910e">(3)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_dcf932e9-5c3f-4992-96a5-1e1945268ac5" id="sch.2-def.gasdevice_"><txt break.before="1"><defterm guid="_8b7632ea-e5d5-42a8-afe8-8ce4dc0f9ad9" id="sch.2-def.gasdevice" type="definition">gas device</defterm> means a gas device (type A) or a gas device (type B).</txt></definition><definition affected.by.uncommenced="0" change="ins" guid="_b9b8fafa-0d15-4774-bd3c-3fcae00f6c93" id="sch.2-def.gasdeviceapprovalauthority_"><txt break.before="1"><defterm guid="_bc0ae4e8-1c73-49c6-bb89-0b40803761ea" id="sch.2-def.gasdeviceapprovalauthority" type="definition">gas device approval authority</defterm> see section 18(1)(j).</txt></definition><definition affected.by.uncommenced="0" guid="_37626cd2-ea92-426b-953e-41fcb1bb4b6d" id="sch.2-def.gasdevicetypeA_"><txt break.before="1"><defterm guid="_be567f21-14ff-4e3a-b768-b05f5928e5fb" id="sch.2-def.gasdevicetypeA" type="definition">gas device (type A)</defterm> see <intref check="valid" refid="sec.724" target.guid="_8b3a81c4-b76c-4e2f-b482-282f9dfea987">section 724</intref><intref check="valid" refid="sec.724-ssec.1" target.guid="_ce85ad44-f0d5-41ab-86c7-d591754b4c0a">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_091ba335-62fa-473a-8600-7af6506af808" id="sch.2-def.gasdevicetypeB_"><txt break.before="1"><defterm guid="_5e29484d-543b-4c5e-870d-4a8d76067bfa" id="sch.2-def.gasdevicetypeB" type="definition">gas device (type B)</defterm> see <intref check="valid" refid="sec.724" target.guid="_8b3a81c4-b76c-4e2f-b482-282f9dfea987">section 724</intref><intref check="valid" refid="sec.724-ssec.3" target.guid="_32526ff4-c63c-4202-9d7a-bf73da05c6bc">(3)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_ffef0258-eed9-42f2-9e47-eec354bd5a2c" id="sch.2-def.gasfitting_"><txt break.before="1"><defterm guid="_3c618223-c8af-41cf-9781-9b26d5bdd3cb" id="sch.2-def.gasfitting" type="definition">gas fitting</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_30ddb5ee-29ec-46f7-a692-94ae4b551587" id="sch.2-def.gasfitting-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">any component of a gas device (type A) or gas device (type B); or</txt></block></li><li guid="_10d0902c-19f1-49f9-907e-26388a86bb18" id="sch.2-def.gasfitting-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a thing used, or designed or intended for use—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_381515e8-a885-4e03-a9c3-6feb2a76e78d" id="sch.2-def.gasfitting-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">with a gas device (type A) or gas device (type B); or</txt></block></li><li guid="_62a41d06-7af3-4a03-9a8f-6d4dc3e184d9" id="sch.2-def.gasfitting-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">in the supply, distribution or consumption of fuel gas.</txt></block></li></list></block></li></list></definition><definition affected.by.uncommenced="0" guid="_5e5de862-ee33-4a0e-9da6-da2b4093ac70" id="sch.2-def.gasificationorretortingproduct_"><txt break.before="1"><defterm guid="_18d0cc97-700c-4f79-b0b4-d69cb30569a7" id="sch.2-def.gasificationorretortingproduct" type="definition">gasification or retorting product</defterm> see <intref check="valid" refid="sec.10" target.guid="_72045839-9d2e-419b-8103-da2e9f726b64">section 10</intref><intref check="valid" refid="sec.10-ssec.2" target.guid="_9ace598d-e861-4ebf-8a6e-5492b3d434ab">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_257f3ec3-4e1d-4e9b-92ad-77cf55dc5d03" id="sch.2-def.gasqualityagreement_"><txt break.before="1"><defterm guid="_31719761-b900-4883-ad8a-8a1cde3811f9" id="sch.2-def.gasqualityagreement" type="definition">gas quality agreement</defterm> see <intref check="valid" refid="sec.621" target.guid="_ed66b462-49ee-4ff9-9763-fe06935ddb9b">section 621</intref><intref check="valid" refid="sec.621-ssec.3" target.guid="_850a346e-e1f8-46cd-9f4e-86300a9a6bf8">(3)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_2d6524a6-7909-44a1-b777-03e75d2f1a59" id="sch.2-def.gasqualityapproval_"><txt break.before="1"><defterm guid="_317a0e90-2acc-4cf3-b673-90f2386acdb5" id="sch.2-def.gasqualityapproval" type="definition">gas quality approval</defterm> see <intref check="valid" refid="sec.622" target.guid="_f61e22bc-82ff-463d-b3ee-a75d9d0acbd2">section 622</intref><intref check="valid" refid="sec.622-ssec.1" target.guid="_6121dc50-3485-4154-963c-321904e823bc">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_7f7e246f-3597-4f24-9b84-b29baceac5c7" id="sch.2-def.gasrelateddevice_"><txt break.before="1"><defterm guid="_03526154-a736-40db-b11d-6de11d954251" id="sch.2-def.gasrelateddevice" type="definition">gas related device</defterm> means any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_a1f2ca6c-fe73-4882-98a9-20dc361129ef" id="sch.2-def.gasrelateddevice-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a gas device;</txt></block></li><li guid="_9f074357-2a57-4819-a062-667429495c1d" id="sch.2-def.gasrelateddevice-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a gas fitting;</txt></block></li><li guid="_1a62fbd6-2e39-4cc8-af02-d20cd8ced046" id="sch.2-def.gasrelateddevice-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a gas system;</txt></block></li><li guid="_8dcb1619-d7b4-4758-8e34-067cf8c07dc1" id="sch.2-def.gasrelateddevice-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a container of fuel gas;</txt></block></li><li guid="_256c32ae-8eb2-4d5d-9961-a1b50d078ba4" id="sch.2-def.gasrelateddevice-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">a device used to transfer fuel gas from one container to another.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_2a5b2700-ab4d-45fd-9bd7-1f24e2bd8c15" id="sch.2-def.gassystem_"><txt break.before="1"><defterm guid="_1a315fee-e384-4faf-a1af-e7fc6e433d5c" id="sch.2-def.gassystem" type="definition">gas system</defterm> means a system that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5d254235-9a81-40f2-b96b-74b44099b42a" id="sch.2-def.gassystem-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">consists of the following things in any combination—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_da1b2a23-db85-4134-823c-0477150932b5" id="sch.2-def.gassystem-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">gas devices;</txt></block></li><li guid="_01a52b58-d97d-4dcc-bde2-2dfa4acf2f9b" id="sch.2-def.gassystem-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">containers;</txt></block></li><li guid="_c7640090-3b90-489e-916f-cb3f55aad3e6" id="sch.2-def.gassystem-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">fittings;</txt></block></li><li guid="_47ca19e0-a09a-4a37-9048-b2e3759e0bfe" id="sch.2-def.gassystem-para1.a-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">flues;</txt></block></li><li guid="_798965de-4892-4637-8f5e-8afb8ba8db47" id="sch.2-def.gassystem-para1.a-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">pipes; and</txt></block></li></list></block></li><li guid="_49762e54-a7d5-4926-9492-2cf55326eafa" id="sch.2-def.gassystem-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is used with, or designed or intended to be used with, fuel gas.</txt></block></li></list><note guid="_2278f742-72ba-47fa-aa78-9f43e5691f91" id="sch.2-def.gassystem-note" type="example"><heading guid="_ab597298-b9f8-4df6-83fd-be0451572ade" id="sch.2-def.gassystem-note-he">Examples of gas systems—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_3f19ba57-915c-42c1-8cb8-e2f908318e4b" id="sch.2-def.gassystem-note-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">an existing system of interconnected domestic gas devices installed in a dwelling house</txt></block></li><li guid="_592538a2-9f56-429b-9a98-83891daca162" id="sch.2-def.gassystem-note-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">a gas device, and associated pipe work, added to an existing system</txt></block></li><li guid="_67ef6135-f4be-4230-9750-5c0f9dfc1970" id="sch.2-def.gassystem-note-para1.3" provision.type="other"><no>3</no><block><txt break.before="0">a gas-fired industrial boiler installation</txt></block></li><li guid="_dd11fa7e-a013-49f2-af6d-6199a62323a0" id="sch.2-def.gassystem-note-para1.4" provision.type="other"><no>4</no><block><txt break.before="0">pipes and fittings installed without a gas device in a dwelling house</txt></block></li></list></block></note></definition><definition affected.by.uncommenced="0" guid="_be13cdbf-cc28-4920-b8d6-f95eb93c3004" id="sch.2-def.gaswork_"><txt break.before="1"><defterm guid="_57a525ef-46a8-4300-aae3-102e10716be8" id="sch.2-def.gaswork" type="definition">gas work</defterm>, for <intref check="valid" refid="ch.9" target.guid="_e115e3d8-9707-4c5d-b3e6-be71f8d522ee">chapter 9</intref>, <del xml:space="preserve">part 6, see </del><ins xml:space="preserve"><intref check="valid" refid="ch.9-pt.6" target.guid="_d6052195-5e83-4b3d-b73c-2e57547f2071">part 6 and chapter 11, part 1AA</intref>, see </ins><intref check="valid" refid="sec.725" target.guid="_632ab8b4-1aa3-486c-af20-0d428ca78f78">section 725</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_fc7d8842-e458-4e6f-a71f-f53eea169442" id="sch.2-def.gasworkauthorisation_"><txt break.before="1"><defterm guid="_764a9b3f-bcb6-4c35-bb31-4724ae77abfd" id="sch.2-def.gasworkauthorisation" type="definition">gas work authorisation</defterm> see <intref check="valid" refid="sec.18" target.guid="_00606342-13a2-49f5-a337-6c1f809e1f2e">section 18</intref><intref check="valid" refid="sec.18-ssec.1" target.guid="_b50a8cff-43ef-47e2-9531-603839cf5b0c">(1)</intref><intref check="valid" refid="sec.18-ssec.1-para1.i" target.guid="_1fb2f16b-99e9-46cb-989a-9cced3e5edfa">(i)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_43541284-bb8f-48d1-9ba9-1564826a0620" id="sch.2-def.gasworklicence_"><txt break.before="1"><defterm guid="_57c65b97-5324-46ea-a33b-433fdfd95052" id="sch.2-def.gasworklicence" type="definition">gas work licence</defterm> see <intref check="valid" refid="sec.18" target.guid="_00606342-13a2-49f5-a337-6c1f809e1f2e">section 18</intref><intref check="valid" refid="sec.18-ssec.1" target.guid="_b50a8cff-43ef-47e2-9531-603839cf5b0c">(1)</intref><intref check="valid" refid="sec.18-ssec.1-para1.h" target.guid="_aea95781-bf10-45c4-bf1a-0f0456f71df1">(h)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_45641b75-907e-4daa-9dca-8009895064b6" id="sch.2-def.genericSMS_"><txt break.before="1"><defterm guid="_6d830053-fe52-497b-96ba-8ff054d4b39c" id="sch.2-def.genericSMS" type="definition">generic SMS</defterm> see <intref check="valid" refid="sec.675A" target.guid="_78c6a4fc-adda-4505-ad0c-94254c38a3f9">section 675A</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_1720a025-7c9f-4ba4-9f17-d8e6c877a151" id="sch.2-def.GeothermalAct_"><txt break.before="1"><defterm guid="_3c7e0073-5fb2-4e48-9906-6b67ea0f8884" id="sch.2-def.GeothermalAct" type="definition">Geothermal Act</defterm> see <intref check="valid" refid="sec.3A" target.guid="_8db3ba2e-1e4b-4c82-999a-291c337f26ff">section 3A</intref><intref check="valid" refid="sec.3A-ssec.1" target.guid="_5f0d231d-181a-4233-8c19-2535c18febbf">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_003f21c4-0ad0-47bc-bde5-34e08b7a3583" id="sch.2-def.geothermalactivity_"><txt break.before="1"><defterm guid="_50824b4f-cc5a-4207-bd89-c0bc8e660453" id="sch.2-def.geothermalactivity" type="definition">geothermal activity</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.18" target.doc.id="act-2010-031" target.guid="_e00e8dbb-9f8f-45e8-9472-816296ffd9cf" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act">section 18</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_492eaeeb-76ae-4b65-b5f5-59d40ab04780" id="sch.2-def.geothermalcoordinationarrangement_"><txt break.before="1"><defterm guid="_d710880c-6b44-47fd-85f6-6e5a32956e1f" id="sch.2-def.geothermalcoordinationarrangement" type="definition">geothermal coordination arrangement</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.138" target.doc.id="act-2010-031" target.guid="_2c40a20d-aaa0-4509-92ab-5285837f3e88" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act">section 138</legref><legref check="invalid" jurisd="QLD" type="act">(4)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_c89b872d-b9b4-4bce-99d6-c5c35fc67519" id="sch.2-def.geothermallease_"><txt break.before="1"><defterm guid="_98681626-9b42-42d8-8232-48a640c91c77" id="sch.2-def.geothermallease" type="definition">geothermal lease</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.19" target.doc.id="act-2010-031" target.guid="_4da84579-7d44-4709-8851-3d16add912be" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act">section 19</legref><legref check="invalid" jurisd="QLD" type="act">(1)</legref><legref check="invalid" jurisd="QLD" type="act">(b)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_6791a23b-1073-4d60-9797-cde12ffe5491" id="sch.2-def.geothermalpermit_"><txt break.before="1"><defterm guid="_d30ec287-5fd3-44ab-859a-820f6dfe0671" id="sch.2-def.geothermalpermit" type="definition">geothermal permit</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.19" target.doc.id="act-2010-031" target.guid="_4da84579-7d44-4709-8851-3d16add912be" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act">section 19</legref><legref check="invalid" jurisd="QLD" type="act">(1)</legref><legref check="invalid" jurisd="QLD" type="act">(a)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_9b5b95e5-e363-43af-bb7d-a265928d3629" id="sch.2-def.geothermalproduction_"><txt break.before="1"><defterm guid="_54ec798d-c06f-4f08-a4e1-3f77b24d5283" id="sch.2-def.geothermalproduction" type="definition">geothermal production</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.14" target.doc.id="act-2010-031" target.guid="_92a887e2-c899-4c51-98aa-3454ad668020" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act">section 14</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_de23e35a-48bc-4683-88b4-01032720cb27" id="sch.2-def.geothermaltenure_"><txt break.before="1"><defterm guid="_20f1566e-362a-4f5a-93e7-ff883b161344" id="sch.2-def.geothermaltenure" type="definition">geothermal tenure</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2010-031" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act"><name emphasis="no">Geothermal Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.19" target.doc.id="act-2010-031" target.guid="_4da84579-7d44-4709-8851-3d16add912be" target.version.series="db02727b-4348-41e8-ad21-0b081feed198" type="act">section 19</legref><legref check="invalid" jurisd="QLD" type="act">(2)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_7fe71c0c-a675-435f-806c-6d016bc7a347" id="sch.2-def.GHG_"><txt break.before="1"><defterm guid="_5055a1af-2d9c-48d9-ade7-83472298766d" id="sch.2-def.GHG" type="definition">GHG</defterm> means greenhouse gas.</txt></definition><definition affected.by.uncommenced="0" guid="_075e82ee-5f41-498c-8ee8-afec05061f7a" id="sch.2-def.GHGauthority_"><txt break.before="1"><defterm guid="_7d77dde8-8718-43b2-8f79-cf1414161d3f" id="sch.2-def.GHGauthority" type="definition">GHG authority</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.18" target.doc.id="act-2009-003" target.guid="_a40ec099-1a0e-45e8-aeda-9b4fce944dcb" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act">section 18</legref><legref check="invalid" jurisd="QLD" type="act">(3)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_e4b1c179-2122-44fc-8426-b1334fda9e44" id="sch.2-def.GHGcoordinationarrangement_"><txt break.before="1"><defterm guid="_16198c37-3e90-4e01-9909-775650f3aac6" id="sch.2-def.GHGcoordinationarrangement" type="definition">GHG coordination arrangement</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.186" target.doc.id="act-2009-003" target.guid="_780d2fa6-1285-4a39-bfdf-679d36f6ee8f" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act">section 186</legref><legref check="invalid" jurisd="QLD" type="act">(3)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_1152cbef-32c9-4be4-abff-d7caea6e948a" id="sch.2-def.GHGlease_"><txt break.before="1"><defterm guid="_2502b203-ed35-40c2-a948-2fc7979125b6" id="sch.2-def.GHGlease" type="definition">GHG lease</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.18" target.doc.id="act-2009-003" target.guid="_a40ec099-1a0e-45e8-aeda-9b4fce944dcb" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act">section 18</legref><legref check="invalid" jurisd="QLD" type="act">(1)</legref><legref check="invalid" jurisd="QLD" type="act">(b)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_07996a32-7cbc-4e13-8812-a9a387d3c7ca" id="sch.2-def.GHGpermit_"><txt break.before="1"><defterm guid="_6edd6fa5-0c9c-4f15-babc-44c7b2193d3c" id="sch.2-def.GHGpermit" type="definition">GHG permit</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.18" target.doc.id="act-2009-003" target.guid="_a40ec099-1a0e-45e8-aeda-9b4fce944dcb" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act">section 18</legref><legref check="invalid" jurisd="QLD" type="act">(1)</legref><legref check="invalid" jurisd="QLD" type="act">(a)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_5d116d90-01c7-4631-a795-2129c440055c" id="sch.2-def.GHGstorageAct_"><txt break.before="1"><defterm guid="_52463759-ceee-4345-8dda-e7cdf0c4e066" id="sch.2-def.GHGstorageAct" type="definition">GHG storage Act</defterm> see <intref check="valid" refid="sec.3A" target.guid="_8db3ba2e-1e4b-4c82-999a-291c337f26ff">section 3A</intref><intref check="valid" refid="sec.3A-ssec.1" target.guid="_5f0d231d-181a-4233-8c19-2535c18febbf">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_eff33e1b-b215-4a68-bc4a-b607fcc086ab" id="sch.2-def.GHGstorageactivity_"><txt break.before="1"><defterm guid="_8c5fabc3-3cc3-4a8a-bd5a-37cbfd581fdc" id="sch.2-def.GHGstorageactivity" type="definition">GHG storage activity</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.23" target.doc.id="act-2009-003" target.guid="_66f430f2-578a-4860-be3c-6385dad73b48" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act">section 23</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_6adf8368-3979-40c9-9c47-fd53217cc1a5" id="sch.2-def.GHGstream_"><txt break.before="1"><defterm guid="_6122e06a-f23f-49eb-ae6c-e74a865f0780" id="sch.2-def.GHGstream" type="definition">GHG stream</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.12" target.doc.id="act-2009-003" target.guid="_a1370cf9-45f5-4d33-9ea0-422705c805d6" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act">section 12</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_45840b78-6360-43fd-af6e-2d14024ead32" id="sch.2-def.GHGstreamstorage_"><txt break.before="1"><defterm guid="_5b995431-2559-4ab2-bc70-7200d91d7602" id="sch.2-def.GHGstreamstorage" type="definition">GHG stream storage</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.14" target.doc.id="act-2009-003" target.guid="_ec654683-7871-4f9f-a659-0b1618b46e90" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act">section 14</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_6f10f974-0d28-4a5c-9d9c-58d0477b1ea0" id="sch.2-def.GHGtenure_"><txt break.before="1"><defterm guid="_aff5ff8f-f052-4ce6-81e5-19b7b141f811" id="sch.2-def.GHGtenure" type="definition">GHG tenure</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-003" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act"><name emphasis="no">GHG storage Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.18" target.doc.id="act-2009-003" target.guid="_a40ec099-1a0e-45e8-aeda-9b4fce944dcb" target.version.series="626a5542-daf1-49aa-8fd9-31543e6151c5" type="act">section 18</legref><legref check="invalid" jurisd="QLD" type="act">(2)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_f8fc5be1-a247-4666-93fd-c69fec93f8c8" id="sch.2-def.give_"><txt break.before="1"><defterm guid="_fca7ccbd-1d9b-466d-8875-b13bc44582bd" id="sch.2-def.give" type="definition">give</defterm>, a document to the Minister, chief executive or chief inspector, other than under a royalty provision, has the meaning affected by <intref check="valid" refid="sec.851AA" target.guid="_1bb215c0-29c7-436b-85d1-d8220a60416c">section 851AA</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_a414b864-1c3b-469a-8bc0-e28eda545afe" id="sch.2-def.holder_"><txt break.before="1"><defterm guid="_cdd1d0ba-c015-466d-b9e0-5e4294f4cda4" id="sch.2-def.holder" type="definition">holder</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c49d359b-d43c-4ee5-b069-72d8642642e4" id="sch.2-def.holder-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">of a petroleum authority, other than the following, means each person recorded as its holder in the register—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_314ad581-f319-4bff-9364-eeba8a6877b0" id="sch.2-def.holder-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a data acquisition authority;</txt></block></li><li guid="_c90b6ef7-6a46-48d0-a57a-c8f76c1fe095" id="sch.2-def.holder-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a water monitoring authority that relates to only 1 petroleum tenure; or</txt></block></li></list></block></li><li guid="_a2f6c1b6-a3c8-4a3b-80ff-bf4e88725a0d" id="sch.2-def.holder-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">of a data acquisition authority, means the person mentioned in <intref check="valid" refid="sec.182" target.guid="_f73ecc82-0768-4239-88c0-8e6477bdfed6">section 182</intref>; or</txt></block></li><li guid="_b1008357-aaf0-48ea-9145-030fbeaa8c88" id="sch.2-def.holder-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">of a water monitoring authority, means the person who is its holder as provided for under <intref check="valid" refid="sec.201" target.guid="_28b3a036-fec2-4fb1-8ba6-e4294eae6edb">section 201</intref>; or</txt></block></li><li change="delReplace" guid="_d6fefac5-bfed-4957-adfe-bdb9ef65d5af-del" id="sch.2-def.holder-para1.d-del" provision.type="other"><no>(d)</no><block><txt break.before="0">of a gas work licence or authorisation, means each person recorded as its holder in the register the chief inspector keeps under <intref check="valid" refid="sec.730" target.guid="_88cecff7-49cd-4db6-96d9-e73df7d047cf">section 730</intref>.</txt></block></li><li change="insReplace" guid="_74985691-0352-417f-b6ba-2ef1dd16c826" id="sch.2-def.holder-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">of a gas work licence, gas work authorisation or gas device approval authority, means each person recorded as its holder in the register the chief inspector keeps under section 734AB.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_32a9c847-2bdc-473d-9994-821c19595cde" id="sch.2-def.holdersubmissions_"><txt break.before="1"><defterm guid="_5db5fd63-cad4-4aff-a944-c6dbfe59316c" id="sch.2-def.holdersubmissions" type="definition">holder submissions</defterm>, for <intref check="valid" refid="ch.3A" target.guid="_4864cab3-5ae5-49c9-aeb6-cdfaa85590af">chapter 3A</intref>, see <intref check="valid" refid="sec.392AH" target.guid="_93b1d0d9-3f3e-4060-b936-3143f1c1a586">section 392AH</intref><intref check="valid" refid="sec.392AH-ssec.1" target.guid="_33dee704-d358-4854-8dd7-e869f2ef7b5e">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_c6df456d-c7d0-4b23-8458-50e1e915132e" id="sch.2-def.incident_"><txt break.before="1"><defterm guid="_9043cbf0-1209-4595-aee9-a11cab2b0063" id="sch.2-def.incident" type="definition">incident</defterm> means an event that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_57af8bed-ae74-4c19-9598-cccbbb4ec0cd" id="sch.2-def.incident-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">involves, or involves a level of risk of, death of, or injury to, a person or damage to property that is not at an acceptable level; and</txt></block></li><li guid="_15926ab1-3187-483b-9288-890f57611eb8" id="sch.2-def.incident-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">happens—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_fd236805-0c57-4df4-a0e4-06b3789bf317" id="sch.2-def.incident-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">at an operating plant, for any reason; or</txt></block></li><li guid="_5508c366-53b1-4cb4-a94c-39c22c90ffab" id="sch.2-def.incident-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">at another place and is associated with a gas related device or the presence, or perceived likely presence, of petroleum or fuel gas or a prescribed storage gas.</txt></block></li></list></block></li></list></definition><definition affected.by.uncommenced="0" guid="_ad9a8f81-cedb-4286-8915-37fcac2504f6" id="sch.2-def.incidentalcoalseamgas_"><txt break.before="1"><defterm guid="_52c6df46-3af6-45cb-b497-e0acfd039efe" id="sch.2-def.incidentalcoalseamgas" type="definition">incidental coal seam gas</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.318CM" target.doc.id="act-1989-110" target.guid="_c4cd0783-ee07-423e-9341-195a04b0637e" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 318CM</legref><legref check="invalid" jurisd="QLD" type="act">(2)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_efb4a58c-0fce-44cb-99f3-aa8d43a9ed77" id="sch.2-def.independentviabilityassessment_"><txt break.before="1"><defterm guid="_cb2a6788-07d5-4088-a64d-22d221bd4747" id="sch.2-def.independentviabilityassessment" type="definition">independent viability assessment</defterm> see <intref check="valid" refid="sec.232" target.guid="_1cb5b534-8acb-4a00-90d9-f9f24fc6d522">section 232</intref><intref check="valid" refid="sec.232-ssec.2" target.guid="_ae00ae80-27fa-44a4-84d0-8576e7506f09">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" change="ins" guid="_265ec11b-2b48-42d3-9161-862ae80561a7" id="sch.2-def.individuallease_"><txt break.before="1"><defterm guid="_b6f45bfe-6468-4da9-99ee-34b9f72af480" id="sch.2-def.individuallease" type="definition">individual lease</defterm>, for chapter 2, part 2, division 7, subdivision 1A, see section 170A(1) or 170B(1).</txt></definition><definition affected.by.uncommenced="0" guid="_ea7667de-348c-48d9-8bef-cf51260c2c21" id="sch.2-def.informationgiver_"><txt break.before="1"><defterm guid="_cf6bd87b-8370-4282-9097-3f9046d96eec" id="sch.2-def.informationgiver" type="definition">information-giver</defterm>, for <intref check="valid" refid="ch.3" target.guid="_7d989cb7-da2a-4737-842c-bd1944dbb54e">chapter 3</intref>, <intref check="valid" refid="ch.3-pt.8" target.guid="_7848573e-9ea5-49cb-a174-595b65c98b82">part 8</intref>, see <intref check="valid" refid="sec.390" target.guid="_d7d3f8fb-d730-449f-8a76-12a035de0bb0">section 390</intref><intref check="valid" refid="sec.390-ssec.1" target.guid="_dd085322-6e94-4a62-87e4-1efb92c26d93">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_04b5878a-7c42-4c2a-b9f3-21d343a9ebd9" id="sch.2-def.informationnotice_"><txt break.before="1"><defterm guid="_172958e0-218b-4855-9ef0-f5a1bdb0be43" id="sch.2-def.informationnotice" type="definition">information notice</defterm>, for a decision, means a notice stating each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_36397bd6-f298-4d4e-a45b-1ded496ffcfa" id="sch.2-def.informationnotice-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the decision, and the reasons for it;</txt></block></li><li guid="_8134b916-f2d8-455d-baf6-69dc17f4ea59" id="sch.2-def.informationnotice-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">all rights of review or appeal under this Act;</txt></block></li><li guid="_80c7b447-5066-459f-b09c-d92c8af376e2" id="sch.2-def.informationnotice-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">the period in which any review or appeal under this Act must be started;</txt></block></li><li guid="_1e2c7602-a733-4126-a8e8-efafe59abbf2" id="sch.2-def.informationnotice-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">how rights of review or appeal under this Act are to be exercised;</txt></block></li><li guid="_dba66a79-6a10-4757-aa38-f378d5aedae4" id="sch.2-def.informationnotice-para1.e" provision.type="other"><no>(e)</no><block><txt break.before="0">that a stay of a decision the subject of review or appeal under this Act may be applied for under this Act.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_648e7348-f758-46fb-928b-39a8ccfce388" id="sch.2-def.informationstatement_"><txt break.before="1"><defterm guid="_3d0e760e-3a77-455a-b24c-0a1d88704c6c" id="sch.2-def.informationstatement" type="definition">information statement</defterm>, for <intref check="valid" refid="ch.3A" target.guid="_4864cab3-5ae5-49c9-aeb6-cdfaa85590af">chapter 3A</intref>, see <intref check="valid" refid="sec.392AE" target.guid="_49bc0e85-6104-48a4-84fe-8d17673d33fd">section 392AE</intref><intref check="valid" refid="sec.392AE-ssec.1" target.guid="_3a8de305-475d-472f-913d-3830d29c024d">(1)</intref><intref check="valid" refid="sec.392AE-ssec.1-para1.a" target.guid="_a8224bec-2f88-495d-bd94-aea13fb53e2a">(a)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_631878af-70ab-4df0-b3eb-2b6754014b3e" id="sch.2-def.initialdevelopmentplanrequirements_"><txt break.before="1"><defterm guid="_5e870840-72c5-47e4-bf7d-af5299a25428" id="sch.2-def.initialdevelopmentplanrequirements" type="definition">initial development plan requirements</defterm> see <intref check="valid" refid="sec.137" target.guid="_01d2ad40-0ddd-419b-aae6-abfb345cc00b">section 137</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_7a1ee8bd-331b-4590-9f4b-b525d2597748" id="sch.2-def.initialworkprogramrequirements_"><txt break.before="1"><defterm guid="_5271cdbd-eb01-4cc4-8ff9-67dfd9689b7f" id="sch.2-def.initialworkprogramrequirements" type="definition">initial work program requirements</defterm> see <intref check="valid" refid="sec.46" target.guid="_8cfb29a5-2f22-4160-a64a-b2acee99cc5b">section 46</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_1500ba38-690f-4966-b926-98cac9e653cb" id="sch.2-def.inspector_"><txt break.before="1"><defterm guid="_1db94309-ba35-4d04-b1c3-533a27c51654" id="sch.2-def.inspector" type="definition">inspector</defterm> means a person who under <intref check="valid" refid="sec.735" target.guid="_85fe3bb6-ecd8-4e7f-a835-361ce2ca84ea">section 735</intref> holds appointment as an inspector, petroleum and gas, or who is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7fef8eb7-2fd7-4e65-828d-dee038a39943" id="sch.2-def.inspector-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the chief inspector; or</txt></block></li><li guid="_ba3cc059-c982-4433-a1cb-84705142291e" id="sch.2-def.inspector-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the deputy chief inspector, petroleum and gas.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_8522f367-28e1-492f-a2ad-d1de4159be4e" id="sch.2-def.interferewith_"><txt break.before="1"><defterm guid="_505b3e7b-3288-4a24-ac21-0036ad8e5c58" id="sch.2-def.interferewith" type="definition">interfere with</defterm> includes tamper with.</txt></definition><definition affected.by.uncommenced="0" guid="_78a64ce0-a565-4f9f-a0c6-d88ee37f0883" id="sch.2-def.internalreviewapplication_"><txt break.before="1"><defterm guid="_05d6268c-012b-46c4-94e6-76e33714dc36" id="sch.2-def.internalreviewapplication" type="definition">internal review application</defterm>, for <intref check="valid" refid="ch.12" target.guid="_27e89a9e-1acd-4e56-96fc-dd3712c2ec2a">chapter 12</intref>, see <intref check="valid" refid="sec.817" target.guid="_3bb240da-66d2-46c4-a13a-500a798a8340">section 817</intref><intref check="valid" refid="sec.817-ssec.1" target.guid="_aa3ff2fa-d486-4675-a66d-45f8dd78750a">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_3ae018d1-a473-4c2e-97ee-4c5eee57ecd7" id="sch.2-def.internalreviewdecision_"><txt break.before="1"><defterm guid="_ff6c27c3-85cc-43d9-982d-23683f1ded8c" id="sch.2-def.internalreviewdecision" type="definition">internal review decision</defterm> see <intref check="valid" refid="sec.820" target.guid="_e33b5880-d8af-4171-850f-cfe1d42e530d">section 820</intref><intref check="valid" refid="sec.820-ssec.1" target.guid="_da465c47-295a-4a6a-884c-562ae6250ccc">(1)</intref><intref check="valid" refid="sec.820-ssec.1-para1.b" target.guid="_c4753d23-49e4-4c47-9dc3-b87377cffaa0">(b)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_4bda4aa1-f945-4c77-a17c-26aeb76f2ea1" id="sch.2-def.jointinteractionmanagementplan_"><txt break.before="1"><defterm guid="_521bd606-4c30-40d5-ae3c-3ffbdb0d4e68" id="sch.2-def.jointinteractionmanagementplan" type="definition">joint interaction management plan</defterm>, for <intref check="valid" refid="ch.9" target.guid="_e115e3d8-9707-4c5d-b3e6-be71f8d522ee">chapter 9</intref>, <intref check="valid" refid="ch.9-pt.4" target.guid="_feccc805-854d-490d-9644-dd7ef21961d9">part 4</intref>, <intref check="valid" refid="ch.9-pt.4-div.5" target.guid="_3ccd9143-f883-4790-8d0d-2f2006c5ce9b">division 5</intref>, <intref check="valid" refid="ch.9-pt.4-div.5-sdiv.1" target.guid="_871b13c6-0132-4ee8-8f83-05a6329f2dbf">subdivision 1</intref>, see <intref check="valid" refid="sec.705B" target.guid="_ab6efd8a-8fa8-409d-b85a-d32d09b9ac88">section 705B</intref><intref check="valid" refid="sec.705B-ssec.1" target.guid="_af4e8e15-5e41-4026-9135-e5a6e7ea93e5">(1)</intref><intref check="valid" refid="sec.705B-ssec.1-para1.a" target.guid="_1060d6d9-d461-4dc1-8200-d1dac7823bd3">(a)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_28a8ec71-228f-4f20-8383-d07ede067ca7" id="sch.2-def.land_"><txt break.before="1"><defterm guid="_edaa4398-418d-41ab-a608-a2f07c6123a6" id="sch.2-def.land" type="definition">land</defterm> includes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3f047271-b834-4145-9551-0dc418009497" id="sch.2-def.land-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">land covered by Queensland waters; and</txt></block></li><li guid="_35c619cd-47f1-450b-898d-40346846e120" id="sch.2-def.land-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">subterranean land.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_96b7e34e-c60f-4eef-875d-e3cfc5a47736" id="sch.2-def.landaccesscode_"><txt break.before="1"><defterm guid="_b12a58da-5e1f-49fc-9845-fdb63beb9382" id="sch.2-def.landaccesscode" type="definition">land access code</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.36" target.doc.id="act-2014-047" target.guid="_35a465e1-da93-40e2-a26f-9a2c1fb50a1b" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">section 36</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_c9824f89-ebd5-4770-b613-494798cc7c37" id="sch.2-def.laterdevelopmentplanrequirements_"><txt break.before="1"><defterm guid="_a4f93e29-27d4-45c9-8fe3-1ab725f80d6d" id="sch.2-def.laterdevelopmentplanrequirements" type="definition">later development plan requirements</defterm> see <intref check="valid" refid="sec.142" target.guid="_2c51dc85-dd53-468b-a675-23e09bf1ddc7">section 142</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_cf82cb2b-4f6a-48dd-8a58-dd5c6bab3b05" id="sch.2-def.laterworkprogramrequirements_"><txt break.before="1"><defterm guid="_d774c79b-fbfe-4d1c-95ef-5934a74c5406" id="sch.2-def.laterworkprogramrequirements" type="definition">later work program requirements</defterm> see <intref check="valid" refid="sec.50" target.guid="_b741e592-55de-42bb-b041-7a488045dfd8">section 50</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_08ab0f16-7b59-43be-b791-0a03f25b2f4d" id="sch.2-def.legacyborehole_"><txt break.before="1"><defterm guid="_4dad4139-ff91-4d72-9a9c-49d962321040" id="sch.2-def.legacyborehole" type="definition">legacy borehole</defterm> means a bore or well that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c6a18cb9-9bbc-47b2-9f7f-c40c57725d26" id="sch.2-def.legacyborehole-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">was drilled for the purpose (the <defterm guid="_ced1d9df-39e0-4974-a146-9aea7a421cc4" id="sch.2-def.legacyborehole-def.originalpurpose" type="definition">original purpose</defterm>) of—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b80f0afa-4d09-4fbc-a822-6f79823681d9" id="sch.2-def.legacyborehole-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">exploration or production of mineral or petroleum resources; or</txt></block></li><li guid="_d01e499b-fe03-4232-a8ec-2a5800bcde33" id="sch.2-def.legacyborehole-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">informing the exploration or production of mineral or petroleum resources; and</txt></block></li></list></block></li><li guid="_35a16610-d4b4-47a1-9e71-d465ebcbf8d2" id="sch.2-def.legacyborehole-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is no longer used for the original or another purpose.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_a8f992f9-1d32-429a-a654-a24fe954692c" id="sch.2-def.liableperson_"><txt break.before="1"><defterm guid="_0b217d1b-4bf3-4336-b191-70028bd95c01" id="sch.2-def.liableperson" type="definition">liable person</defterm>, for <intref check="valid" refid="ch.6" target.guid="_1179c65a-355e-4281-a616-c3e83927d1e4">chapter 6</intref>, <intref check="valid" refid="ch.6-pt.3" target.guid="_043c7be5-9f1a-4efb-93f0-334493cf7967">part 3</intref>, <intref check="valid" refid="ch.6-pt.3-div.2" target.guid="_a37c41c1-27bf-4f02-9771-f9acc51efd1d">division 2</intref>, see <intref check="valid" refid="sec.604AD" target.guid="_74ca95c0-0268-481e-af87-18a71ef6cb4f">section 604AD</intref><intref check="valid" refid="sec.604AD-ssec.1" target.guid="_2f802e34-1993-46d5-a5ad-9b3478409890">(1)</intref><intref check="valid" refid="sec.604AD-ssec.1-para1.a" target.guid="_3df41905-b3c5-456a-8688-b5bd0418ad2c">(a)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_4b704243-7d7d-4992-b3eb-f28e30d20af2" id="sch.2-def.licence_"><txt break.before="1"><defterm guid="_0a8f6881-02b1-494f-b38c-ff6ff5b81903" id="sch.2-def.licence" type="definition">licence</defterm> see <intref check="valid" refid="sec.18" target.guid="_00606342-13a2-49f5-a337-6c1f809e1f2e">section 18</intref><intref check="valid" refid="sec.18-ssec.4" target.guid="_47d39f98-85b0-48d1-ad3f-5c6ddf30c94a">(4)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_80b46d75-7668-49e0-8764-0962a1c98b42" id="sch.2-def.licensedwaterboredriller_"><txt break.before="1"><defterm guid="_cbdaa74d-a0cd-4990-965a-154f839c3b47" id="sch.2-def.licensedwaterboredriller" type="definition">licensed water bore driller</defterm> means an individual who holds a water bore driller’s licence under the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_c4877d7a-6ae5-4540-b5b4-f97b3d69997e" id="sch.2-def.lodge_"><txt break.before="1"><defterm guid="_3073e67a-8862-43d3-8ba4-34b1a01d47a0" id="sch.2-def.lodge" type="definition">lodge</defterm>, a document, has the meaning affected by <intref check="valid" refid="sec.851AA" target.guid="_1bb215c0-29c7-436b-85d1-d8220a60416c">section 851AA</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_2bd1a9b2-32d4-4fba-90bb-46f61938c280" id="sch.2-def.lowimpact_"><txt break.before="1"><defterm guid="_65b2c67e-86ae-4a00-ad09-83c598c8ff2d" id="sch.2-def.lowimpact" type="definition">low impact</defterm>, for an activity or infrastructure, means the activity or infrastructure—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8e97c9b0-eeca-43a4-9b0f-3bdcae239ce7" id="sch.2-def.lowimpact-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is of low impact on the environment; and</txt></block></li><li guid="_43201b3e-949d-451f-864c-381c3e60164e" id="sch.2-def.lowimpact-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is of low impact for land disturbance; and</txt></block></li><li guid="_85414338-c862-4967-8250-4b3e8fdb020a" id="sch.2-def.lowimpact-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">does not adversely affect the carrying out of an authorised activity, or is not likely to adversely affect the carrying out of a future authorised activity, under a mineral (f) tenure.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_16c908cc-20ec-42e1-b903-0925f288d16e" id="sch.2-def.LPG_"><txt break.before="1"><defterm guid="_bc416cfa-36be-4d5e-b0ba-6c05a06d8386" id="sch.2-def.LPG" type="definition">LPG</defterm> see <intref check="valid" refid="sec.11" target.guid="_c9cf5fe6-8bf6-4377-8158-7ec71eb91206">section 11</intref><intref check="valid" refid="sec.11-ssec.1" target.guid="_2faa8b67-8b21-4195-b5f8-55207675b902">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" change="del" guid="_49e27240-df5f-41a1-8984-6340416eefad-del" id="sch.2-def.LPGdeliverynetwork_-del"><txt break.before="1"><defterm guid="_7faeee51-526e-4f47-b750-13a5e0dc8854-del" id="sch.2-def.LPGdeliverynetwork-del" type="definition">LPG delivery network</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7c700ebf-c294-4afc-8564-7048106a32c9-del" id="sch.2-def.LPGdeliverynetwork-para1.a-del" provision.type="other"><no>(a)</no><block><txt break.before="0">means the supply of LPG in fuel gas containers that are owned or provided (other than by being sold) by a person (a <defterm guid="_6b0f40f4-42c5-41fb-80b7-8879f3babf35-del" id="sch.2-def.LPGdeliverynetwork-def.productsupplier-del" type="definition">product supplier</defterm>) to a consumer or another person in the business of distributing LPG; and</txt></block></li><li guid="_475e56cd-e7b2-434a-b23f-ad5eb022cc5d-del" id="sch.2-def.LPGdeliverynetwork-para1.b-del" provision.type="other"><no>(b)</no><block><txt break.before="0">includes any part of the supply, or an activity incidental to the supply, that is carried out by an agent of the product supplier.</txt></block></li></list><note guid="_a7579f5a-ef03-4865-9aad-87c71b18e06e-del" id="sch.2-def.LPGdeliverynetwork-note-del" type="example"><heading guid="_fa2f2206-06d3-43c8-890b-432fdd936347-del" id="sch.2-def.LPGdeliverynetwork-note-he-del">Examples of an LPG delivery network—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_35635c2d-90f4-4f41-8b76-076887a18bfc-del" id="sch.2-def.LPGdeliverynetwork-note-para1-del" provision.type="other"><no>•</no><block><txt break.before="0">the filling, storing or delivery of cylinders of LPG to a consumer or to a distributor</txt></block></li><li guid="_9dd6aec4-5b4b-486b-b4db-d417742d16a5-del" id="sch.2-def.LPGdeliverynetwork-note-para1-oc.2-del" provision.type="other"><no>•</no><block><txt break.before="0">the bulk delivery of LPG to a container</txt></block></li><li guid="_07e7aa5c-0573-4db7-b643-744f7a962d82-del" id="sch.2-def.LPGdeliverynetwork-note-para1-oc.3-del" provision.type="other"><no>•</no><block><txt break.before="0">the maintenance of cylinders and storage equipment used for the supply of LPG</txt></block></li></list></block></note></definition><definition affected.by.uncommenced="0" guid="_085ce6dc-0027-4418-82f2-46f66a429ad7" id="sch.2-def.makesubmissions_"><txt break.before="1"><defterm guid="_472d0310-8c59-4fcb-b5fb-acd70b55ceb4" id="sch.2-def.makesubmissions" type="definition">make submissions</defterm> has the meaning affected by <intref check="valid" refid="sec.851AA" target.guid="_1bb215c0-29c7-436b-85d1-d8220a60416c">section 851AA</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_909a081c-8d95-4db6-822f-347f5804a41a" id="sch.2-def.mandatorycondition_"><txt break.before="1"><defterm guid="_4f08fda5-0caa-420d-90c3-4ded0aa1a37f" id="sch.2-def.mandatorycondition" type="definition">mandatory condition</defterm>, of a petroleum authority, see <intref check="valid" refid="sec.20" target.guid="_746e989f-44f2-4d9b-9550-13495b74b131">section 20</intref><intref check="valid" refid="sec.20-ssec.2" target.guid="_6716699a-7cd3-4f35-945e-49a35a3ccdd3">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_78549bd7-51f0-49ef-aa46-fc9052d9233c" id="sch.2-def.mandatoryprovision_"><txt break.before="1"><defterm guid="_24eaae2a-6521-426a-9720-5958aad5e0d0" id="sch.2-def.mandatoryprovision" type="definition">mandatory provision</defterm>, of the land access code, means a provision of that code that the code requires compliance with.</txt></definition><definition affected.by.uncommenced="0" guid="_2835e36a-dc14-41e8-9e6d-1cbf04ee9e19" id="sch.2-def.MDLA407_"><txt break.before="1"><defterm guid="_48fac6d2-68d0-45c1-8450-271e427bc036" id="sch.2-def.MDLA407" type="definition">MDLA 407</defterm> see <intref check="valid" refid="sec.363B" target.guid="_a45dc9ac-29cb-4156-b8c7-ba91308a76e4">section 363B</intref><intref check="valid" refid="sec.363B-ssec.2" target.guid="_08162d04-2292-4165-ae7c-5721f6891a62">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_ac4d81a3-81e9-414c-a92f-c40046ac3891" id="sch.2-def.measurement_"><txt break.before="1"><defterm guid="_22668e7a-bca1-4333-ad17-b330c757e866" id="sch.2-def.measurement" type="definition">measurement</defterm>, of petroleum or fuel gas, see <intref check="valid" refid="sec.634" target.guid="_94a59e99-adf0-4597-a399-fdcbb1372799">section 634</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_a33fe8ec-1563-4110-965b-2ee0ebe8064f" id="sch.2-def.measurementscheme_"><txt break.before="1"><defterm guid="_4ede02a8-181a-46ae-b3f9-b061006ecf22" id="sch.2-def.measurementscheme" type="definition">measurement scheme</defterm>, for a meter, see <intref check="valid" refid="sec.633" target.guid="_1a1d3f82-ff98-4b33-bdc5-40c10c4a0293">section 633</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_894a0eae-9953-43bb-92ae-bbb1df731839" id="sch.2-def.meter_"><txt break.before="1"><defterm guid="_f54ca38b-8c80-416a-8144-f58f5605211e" id="sch.2-def.meter" type="definition">meter</defterm> see <intref check="valid" refid="sec.631" target.guid="_738c16a7-1f0b-4542-8188-ae0cd37dc7ab">section 631</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_00896b91-b3e6-4da2-8c75-194a0fce6d6f" id="sch.2-def.mineralf_"><txt break.before="1"><defterm guid="_19423901-ec71-4166-a117-d27784d033e8" id="sch.2-def.mineralf" type="definition">mineral (f)</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="yes">Mineral Resources Act 1989</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.6" target.doc.id="act-1989-110" target.guid="_cba104cf-a295-4ea0-9771-65afaf74886e" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 6</legref><legref check="invalid" jurisd="QLD" type="act">(2)</legref><legref check="invalid" jurisd="QLD" type="act">(f)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_a683258f-2a5a-4c50-b54d-b4841e452113" id="sch.2-def.mineralfpilottenure_"><txt break.before="1"><defterm guid="_8d2affc4-d8c9-4e11-ad17-09ffa33ab592" id="sch.2-def.mineralfpilottenure" type="definition">mineral (f) pilot tenure</defterm> see <intref check="valid" refid="sec.363B" target.guid="_a45dc9ac-29cb-4156-b8c7-ba91308a76e4">section 363B</intref><intref check="valid" refid="sec.363B-ssec.1" target.guid="_0e67b7f0-2724-4884-a48c-a30323155801">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_db639e3e-8e8c-4c76-aeda-57bdb57f0583" id="sch.2-def.mineralfproductiontenure_"><txt break.before="1"><defterm guid="_d583ab91-ba2b-44c9-acaa-10e86e9668b9" id="sch.2-def.mineralfproductiontenure" type="definition">mineral (f) production tenure</defterm> see <intref check="valid" refid="sec.363A" target.guid="_3cfc2170-6aa3-4279-be07-d1506d954db7">section 363A</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_e8de3a7c-ed95-4909-a45d-7ebc6f35a0f2" id="sch.2-def.mineralftenure_"><txt break.before="1"><defterm guid="_ffa925db-663c-4f15-bbc5-734951cf89df" id="sch.2-def.mineralftenure" type="definition">mineral (f) tenure</defterm> see <intref check="valid" refid="sec.363A" target.guid="_3cfc2170-6aa3-4279-be07-d1506d954db7">section 363A</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_4bc25917-79b6-4f14-b0ed-eb4dbb10ea87" id="sch.2-def.mineralhydrocarbonmininglease_"><txt break.before="1"><defterm guid="_90f8a17e-4c78-49a5-b938-9055202767ff" id="sch.2-def.mineralhydrocarbonmininglease" type="definition">mineral hydrocarbon mining lease</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="yes">Mineral Resources Act 1989</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.739" target.doc.id="act-1989-110" target.guid="_f5567d90-e189-4a85-96fa-3265a4be5125" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 739</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_8d3172b0-e93f-4636-affe-2c5f6a7ac7a7" id="sch.2-def.MineralResourcesAct_"><txt break.before="1"><defterm guid="_35fe6536-7c7b-4f58-9553-6683f5f7e8ad" id="sch.2-def.MineralResourcesAct" type="definition">Mineral Resources Act</defterm> means the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="yes">Mineral Resources Act 1989</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_fb329d17-5e65-4849-9db4-b58e44eaeba6" id="sch.2-def.mininginterest_"><txt break.before="1"><defterm guid="_0ef04785-e1e4-4708-8c3d-46f6bc00a258" id="sch.2-def.mininginterest" type="definition">mining interest</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c8b2459a-a6ff-4070-9bb1-db5f6bf4e8cb" id="sch.2-def.mininginterest-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a mining tenement under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>; or</txt></block></li><li guid="_aa736e8f-4938-4531-8e9e-a8d2515f7824" id="sch.2-def.mininginterest-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a tenure held from the State under another Act about mining, under which tenure the holder is authorised to carry out mining under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref> or a related mineral or energy resources activity.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_dbdb00d5-acd2-4b4c-8cd8-5d8da4cc73de" id="sch.2-def.mininglease_"><txt break.before="1"><defterm guid="_650c2453-4da2-4085-9fc6-01eb0667bded" id="sch.2-def.mininglease" type="definition">mining lease</defterm> see <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sch.2" target.doc.id="act-1989-110" target.guid="_b509e0c2-c860-4462-b500-bf240c580505" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">schedule 2</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_1b549ca2-5677-4da2-ac59-1f9e70b51b58" id="sch.2-def.miningleaseapplicationperiod_"><txt break.before="1"><defterm guid="_d94f2806-66ca-40de-8748-2db1dab0a2b0" id="sch.2-def.miningleaseapplicationperiod" type="definition">mining lease application period</defterm> see <intref check="valid" refid="sec.323" target.guid="_890340e8-daa9-48d8-9e24-3447adc0598f">section 323</intref><intref check="valid" refid="sec.323-ssec.2" target.guid="_e4b95999-721b-4ec9-bf85-b8c78bb94359">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" change="ins" guid="_10232331-3516-476d-89f9-e5a771e7bd20" id="sch.2-def.miningsafetylegislation_"><txt break.before="1"><defterm guid="_5ce1801f-6933-4bcf-98de-c7426301f51b" id="sch.2-def.miningsafetylegislation" type="definition">mining safety legislation</defterm> see the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="no">Common Provisions Act</name></legref>, schedule 2.</txt></definition><definition affected.by.uncommenced="0" guid="_48a4d356-1f2f-4e14-bf41-3a48432db7b9" id="sch.2-def.miningtenement_"><txt break.before="1"><defterm guid="_50301dea-e4fb-4f4b-8988-16377cdc3239" id="sch.2-def.miningtenement" type="definition">mining tenement</defterm> means a mining tenement under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_a09e44e9-0884-4028-9521-277c710c3adc" id="sch.2-def.naturalundergroundreservoir_"><txt break.before="1"><defterm guid="_9453884a-e86c-499d-9184-4935d06e0c8d" id="sch.2-def.naturalundergroundreservoir" type="definition">natural underground reservoir</defterm> see <intref check="valid" refid="sec.13" target.guid="_1ab292d4-1231-47ba-bcd2-ad46b146d4aa">section 13</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_6db649a7-6ad1-4071-ad7b-379a42949b54" id="sch.2-def.negotiationnotice_"><txt break.before="1"><defterm guid="_2544f8df-f8a4-45c4-ada6-b49db6af3289" id="sch.2-def.negotiationnotice" type="definition">negotiation notice</defterm>, for <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.6" target.guid="_55412cd7-ecff-4e2b-99fa-1c2290aac632">part 6</intref>, <intref check="valid" refid="ch.2-pt.6-div.3" target.guid="_fdcb9028-dc52-4ad5-9359-62ed5afd2f91">division 3</intref>, <intref check="valid" refid="ch.2-pt.6-div.3-sdiv.4" target.guid="_11993b0b-d79d-4661-b418-dafa00af4b59">subdivision 4</intref>, see <intref check="valid" refid="sec.221" target.guid="_258b2335-28ef-4c6d-893b-d1ae9a89913c">section 221</intref><intref check="valid" refid="sec.221-ssec.2" target.guid="_4f9e5d59-acda-4dca-bffb-bf30119327bc">(2)</intref><intref check="valid" refid="sec.221-ssec.2-para1.a" target.guid="_eed588ef-b15b-416a-9f9b-f8584d8fc3df">(a)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_ca1cfe58-2887-44a1-ad7e-7d658611fc21" id="sch.2-def.newauthorities_"><txt break.before="1"><defterm guid="_0aaa7b06-3e72-4c2b-9e7e-8eb44ffc5e56" id="sch.2-def.newauthorities" type="definition">new authorities</defterm>, for an application to divide an authority to prospect, see <intref check="valid" refid="sec.103" target.guid="_83097d28-9e78-456a-b9bb-5a036d76d855">section 103</intref><intref check="valid" refid="sec.103-ssec.1" target.guid="_c32b343e-7c7f-49a5-89df-b6a4fb3aba61">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_9101fd1d-6afc-4af5-bdb9-659e262cbd1c" id="sch.2-def.newleases_"><txt break.before="1"><defterm guid="_abf400af-0fed-464c-94cc-98a6910bb7c0" id="sch.2-def.newleases" type="definition">new leases</defterm>, for an application to divide a petroleum lease, see <intref check="valid" refid="sec.171" target.guid="_92514d73-728f-461e-ac8f-1b34a9f2beb1">section 171</intref><intref check="valid" refid="sec.171-ssec.1" target.guid="_f4af286f-3a5b-4a46-b637-3753640a8263">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_32bcc2df-1640-4b94-9daf-cfad41ab5f7f" id="sch.2-def.noncomplianceaction_"><txt break.before="1"><defterm guid="_f5cf4215-cbf7-426d-967e-e5d6e16d90b4" id="sch.2-def.noncomplianceaction" type="definition">noncompliance action</defterm> means action of a type mentioned in <intref check="valid" refid="sec.790" target.guid="_0ae40873-0f6d-4440-a74c-a02fa5649d4f">section 790</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_a1ba0f73-d42d-48d3-970d-a187bf5693e0" id="sch.2-def.nonownerlease_"><txt break.before="1"><defterm guid="_e6724379-8437-494a-9eea-1dea7a19a601" id="sch.2-def.nonownerlease" type="definition">non-owner lease</defterm> see <intref check="valid" refid="sec.221" target.guid="_258b2335-28ef-4c6d-893b-d1ae9a89913c">section 221</intref><intref check="valid" refid="sec.221-ssec.1" target.guid="_025f0b30-3b21-4c45-8f6b-651b7b79b00d">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_076e1217-dc70-40d6-aa74-b021efedc113" id="sch.2-def.notice_"><txt break.before="1"><defterm guid="_4b6e8049-2a54-4763-a696-a34ae33974f3" id="sch.2-def.notice" type="definition">notice</defterm> means a written notice.</txt></definition><definition affected.by.uncommenced="0" guid="_979ea71d-4d3e-4087-8a9d-2443ac06fc67" id="sch.2-def.noticeofclaim_"><txt break.before="1"><defterm guid="_d3b2e8ff-e98b-4fbb-9cb5-b0afef021b01" id="sch.2-def.noticeofclaim" type="definition">notice of claim</defterm> see <intref check="valid" refid="sec.213" target.guid="_1c3a0b45-7084-423c-bee1-987a003ce0d7">section 213</intref><intref check="valid" refid="sec.213-ssec.1" target.guid="_fad8b8e9-5538-466b-87f5-8077bf945261">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_2b03b686-5c2a-4f84-aaea-66b41eb713de" id="sch.2-def.noticeofintentiontoresume_"><txt break.before="1"><defterm guid="_5bb21c5a-ea19-45c4-9652-a261d82352c3" id="sch.2-def.noticeofintentiontoresume" type="definition">notice of intention to resume</defterm>, for the proposed taking of land under a resumption law, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_14e6d7c7-9103-420e-9998-e8a1cf074d15" id="sch.2-def.noticeofintentiontoresume-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the land is taken under the process stated in the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="no">ALA</name></legref> (whether the land is taken under the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="no">ALA</name></legref> or another resumption law)—the notice of intention to resume under the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="no">ALA</name></legref>; or</txt></block></li><li guid="_bf444389-3200-4d07-bb93-28a4da410c46" id="sch.2-def.noticeofintentiontoresume-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—the notice, however named, required to be given under the resumption law to notify persons of the proposed taking.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_bd9eceb4-071c-418c-95f4-08917f99a503" id="sch.2-def.notifiableroaduse_"><txt break.before="1"><defterm guid="_705c2470-4ccd-4d23-a338-409ac74fbe5e" id="sch.2-def.notifiableroaduse" type="definition">notifiable road use</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.62" target.doc.id="act-2014-047" target.guid="_85adaf9b-3141-410c-91ed-802a9fae9194" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">section 62</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_1f629955-6a48-4cbc-8703-d9d3ab2b3b1e" id="sch.2-def.occupier_"><txt break.before="1"><defterm guid="_29eff639-a1c8-42de-bbea-9a37e801aaab" id="sch.2-def.occupier" type="definition">occupier</defterm>, of a place, means a person—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_4def7447-9dd4-4fe2-88ab-242ba5ef195b" id="sch.2-def.occupier-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">who, under an Act or a lease registered under the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-011" target.version.series="d93aa9d4-b864-42f4-88c5-b51b98fee2e2" type="act"><name emphasis="yes">Land Title Act 1994</name></legref>, has a right to occupy the place, other than under a mining interest, petroleum tenure, licence, GHG authority or geothermal tenure; or</txt></block></li><li guid="_f29b1d8e-baee-4c3e-9964-42e7c5b1ca87" id="sch.2-def.occupier-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to whom an owner of the place or another occupier under <intref check="valid" refid="sch.2-def.occupier-para1.a" target.guid="_4def7447-9dd4-4fe2-88ab-242ba5ef195b">paragraph (a)</intref> has given the right to occupy the place.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_1d65c5d9-afb6-4888-bebb-0dfc52752daa" id="sch.2-def.official_"><txt break.before="1"><defterm guid="_f0ab6b98-208b-470d-a350-1b33ed39c97d" id="sch.2-def.official" type="definition">official</defterm> means the Minister, the chief executive, the <ins xml:space="preserve">CEO, the WHS prosecutor, the </ins>commissioner, an inspector or an authorised officer.</txt></definition><definition affected.by.uncommenced="0" guid="_9e40531f-57a2-4fc0-8163-167e7580fbec" id="sch.2-def.oilshale_"><txt break.before="1"><defterm guid="_755a1faf-a9f0-492b-bd51-55adafd34ef2" id="sch.2-def.oilshale" type="definition">oil shale</defterm> see <intref check="valid" refid="sec.300" target.guid="_7ce52326-28ba-4367-bd0a-edb4d3f81999">section 300</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_472986d0-398d-41e7-bfa8-fa9c78025273" id="sch.2-def.oilshaleexplorationtenement_"><txt break.before="1"><defterm guid="_92b22210-8663-4e0c-a236-850d22cf1484" id="sch.2-def.oilshaleexplorationtenement" type="definition">oil shale exploration tenement</defterm> see <intref check="valid" refid="sec.302" target.guid="_ad5e0589-b8fc-43bd-b0d0-1cdd040bb038">section 302</intref><intref check="valid" refid="sec.302-ssec.1" target.guid="_1ecedbfa-2421-4903-954d-16653bbc6f00">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_853cce44-612b-4395-9f55-da6a65db03af" id="sch.2-def.oilshalemininglease_"><txt break.before="1"><defterm guid="_a84554b1-e920-4d3e-8baa-0a1daf1d879c" id="sch.2-def.oilshalemininglease" type="definition">oil shale mining lease</defterm> see <intref check="valid" refid="sec.302" target.guid="_ad5e0589-b8fc-43bd-b0d0-1cdd040bb038">section 302</intref><intref check="valid" refid="sec.302-ssec.2" target.guid="_0bb3a84e-c9f8-42c1-9080-ca56db02aae1">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_307fefe1-2ece-4255-914c-b2339c523d0a" id="sch.2-def.oldlease_"><txt break.before="1"><defterm guid="_6249ecaf-8bf4-41b6-8e63-e0510a88b906" id="sch.2-def.oldlease" type="definition">old lease</defterm>, for <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.6" target.guid="_55412cd7-ecff-4e2b-99fa-1c2290aac632">part 6</intref>, <intref check="valid" refid="ch.2-pt.6-div.3" target.guid="_fdcb9028-dc52-4ad5-9359-62ed5afd2f91">division 3</intref>, see <intref check="valid" refid="sec.212" target.guid="_c8094af7-5be6-4692-bdfb-6721f650ebfe">section 212</intref><intref check="valid" refid="sec.212-ssec.1" target.guid="_e6562798-0fe2-4a5c-992d-031e4de6796f">(1)</intref><intref check="valid" refid="sec.212-ssec.1-para1.a" target.guid="_096ef9c8-572a-48bf-84dc-bb1e912d8d8b">(a)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_3e7d7dd9-89f9-4eed-adfb-865822e8c0c7" id="sch.2-def.on_"><txt break.before="1"><defterm guid="_2b6f366a-5977-4677-8d1f-87bd4fb408fa" id="sch.2-def.on" type="definition">on</defterm>, land or another place, includes across, attached to, in, under or over the land or place.</txt></definition><definition affected.by.uncommenced="0" guid="_731f15ef-33b6-453c-952c-2bf8c4904e64" id="sch.2-def.operate_"><txt break.before="1"><defterm guid="_74cf839d-9606-42cc-bb50-3c675132f44b" id="sch.2-def.operate" type="definition">operate</defterm>, a pipeline or petroleum facility—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8b8e73fd-5b53-4912-b5ba-710fefa11cad" id="sch.2-def.operate-para1.1" provision.type="other"><no>1</no><block><txt break.before="0"><defterm guid="_e96f2715-326f-48ff-81db-5936858a1c84" type="mention">Operate</defterm>, a pipeline or petroleum facility, includes use, inspect, test, maintain, repair, alter, add to and replace the pipeline or facility.</txt></block></li><li guid="_3aa60fed-1153-4892-a114-9cbcaf8dfbd0" id="sch.2-def.operate-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">For paragraph 1, using a pipeline includes using it to transport—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e4b209dc-c961-4db9-ac50-d3e70b9c0680" id="sch.2-def.operate-para1.2-para2.a" provision.type="other"><no>(a)</no><block><txt break.before="0">generally—petroleum, fuel gas or produced water; and</txt></block></li><li guid="_b189f3cf-ec38-4076-becf-6ebb9b9a237e" id="sch.2-def.operate-para1.2-para2.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if, under <intref check="valid" refid="sec.402" target.guid="_162af7e9-4ec5-415a-92d5-f4bf364cfe65">section 402</intref>, the right to operate the pipeline is extended to include another substance—the other substance.</txt></block></li></list></block></li></list></definition><definition affected.by.uncommenced="0" guid="_f7b91e44-7522-488e-8257-0ce33559b32e" id="sch.2-def.operate_-oc.2"><txt break.before="1"><defterm guid="_79a87ba4-646d-4fc5-8d38-9167bcc179dc" id="sch.2-def.operate-def.operate" type="definition">operate</defterm>, for operating plant that, under <intref check="valid" refid="sec.670" target.guid="_ca9c15a9-9ec2-415e-a6f6-8de0dd5edbf7">section 670</intref><intref check="valid" refid="sec.670-ssec.6" target.guid="_71029d28-afec-43f6-b66e-bf422d0140e6">(6)</intref> and <intref check="valid" refid="sec.670-ssec.7" target.guid="_5c8852f3-19f0-44a0-b6ec-30ae5c8e49ba">(7)</intref>, consists of joint authorised activities, means to carry out all or any of the activities.</txt></definition><definition affected.by.uncommenced="0" guid="_14576f5f-b1b0-4dd8-b920-76e944d3a580" id="sch.2-def.operatingplant_"><txt break.before="1"><defterm guid="_fa53e882-8627-46f5-bd61-0016ad7a7f0d" id="sch.2-def.operatingplant" type="definition">operating plant</defterm> see <intref check="valid" refid="sec.670" target.guid="_ca9c15a9-9ec2-415e-a6f6-8de0dd5edbf7">section 670</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_f77e1824-b381-441b-a6be-9bce9f63233f" id="sch.2-def.operator_"><txt break.before="1"><defterm guid="_c9c9969e-da3f-49fe-9723-b1c39f5c1759" id="sch.2-def.operator" type="definition">operator</defterm>, of an operating plant, see <intref check="valid" refid="sec.673" target.guid="_e43ae51f-18e7-4ccb-8c84-1ab892c45eb3">section 673</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_f2452fdb-2296-4d89-bee5-9dd1005ee4f0" id="sch.2-def.originalassessment_"><txt break.before="1"><defterm guid="_3e1ced01-49c3-4184-852c-1bcd93148739" id="sch.2-def.originalassessment" type="definition">original assessment</defterm>, for <intref check="valid" refid="ch.6" target.guid="_1179c65a-355e-4281-a616-c3e83927d1e4">chapter 6</intref>, see <intref check="valid" refid="sec.592A" target.guid="_bb630892-e7a1-4893-9908-dad90c5a0f49">section 592A</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_a5fe2bf4-953e-4a00-bb9e-66d463fe3002" id="sch.2-def.originalauthority_"><txt break.before="1"><defterm guid="_2efcc33f-33cb-486c-933a-cf86faa2b667" id="sch.2-def.originalauthority" type="definition">original authority</defterm>, for an application to divide an authority to prospect, see <intref check="valid" refid="sec.103" target.guid="_83097d28-9e78-456a-b9bb-5a036d76d855">section 103</intref><intref check="valid" refid="sec.103-ssec.1" target.guid="_c32b343e-7c7f-49a5-89df-b6a4fb3aba61">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_bbe9bfff-0165-4694-8b14-4f087d354044" id="sch.2-def.originaldecision_"><txt break.before="1"><defterm guid="_84278850-22ac-4200-b548-c20908fe9938" id="sch.2-def.originaldecision" type="definition">original decision</defterm> see <intref check="valid" refid="sec.817" target.guid="_3bb240da-66d2-46c4-a13a-500a798a8340">section 817</intref><intref check="valid" refid="sec.817-ssec.1" target.guid="_aa3ff2fa-d486-4675-a66d-45f8dd78750a">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_c64557f7-e6ca-431c-bcdf-a3080de04619" id="sch.2-def.originallease_"><txt break.before="1"><defterm guid="_d3d0de51-3e49-42ea-9645-c4c62c0a75ca" id="sch.2-def.originallease" type="definition">original lease</defterm>, for an application to divide a petroleum lease, see <intref check="valid" refid="sec.171" target.guid="_92514d73-728f-461e-ac8f-1b34a9f2beb1">section 171</intref><intref check="valid" refid="sec.171-ssec.1" target.guid="_f4af286f-3a5b-4a46-b637-3753640a8263">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_1a6cdd00-249c-4d90-a762-dab97cdc8318" id="sch.2-def.originalnotionalsubblocks_"><txt break.before="1"><defterm guid="_7fc58afb-f6c8-40b0-bda3-15b65307efdf" id="sch.2-def.originalnotionalsubblocks" type="definition">original notional sub-blocks</defterm>, of an authority to prospect—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_49a81843-bf07-4bb2-9e90-f3c47093d5a2" id="sch.2-def.originalnotionalsubblocks-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">The <defterm guid="_3044911b-a2f5-4c8f-b757-0efd1c150883" type="mention">original notional sub-blocks</defterm>, of an authority to prospect, are the sub-blocks included in the area of the authority at the following time—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9ea4e0f5-ccd2-4bfb-b016-9f441730a10c" id="sch.2-def.originalnotionalsubblocks-para1.1-para2.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the authority was granted before 31 December 2004—immediately after its first renewal after that day;</txt></block></li><li guid="_41daa166-1ebf-4246-b8a4-0a3d43066a30" id="sch.2-def.originalnotionalsubblocks-para1.1-para2.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the authority was granted on or after 31 December 2004—when it was originally granted.</txt></block></li></list></block></li><li guid="_a815ec51-4e8d-49d6-b147-b2980f429277" id="sch.2-def.originalnotionalsubblocks-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">However, the <defterm guid="_dd09ab39-c9d2-4f98-8312-5dbf4762fad4" type="mention">original notional sub-block</defterm>s do not include any sub-block completely within the area of a petroleum lease or <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> lease.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_3e6f0696-0684-4f1a-ad02-061fd2125f51" id="sch.2-def.overlappingarea_"><txt break.before="1"><defterm guid="_616cf148-1fed-4350-8477-1ec3efca5c96" id="sch.2-def.overlappingarea" type="definition">overlapping area</defterm>, for <intref check="valid" refid="ch.9" target.guid="_e115e3d8-9707-4c5d-b3e6-be71f8d522ee">chapter 9</intref>, <intref check="valid" refid="ch.9-pt.4" target.guid="_feccc805-854d-490d-9644-dd7ef21961d9">part 4</intref>, <intref check="valid" refid="ch.9-pt.4-div.5" target.guid="_3ccd9143-f883-4790-8d0d-2f2006c5ce9b">division 5</intref>, <intref check="valid" refid="ch.9-pt.4-div.5-sdiv.1" target.guid="_871b13c6-0132-4ee8-8f83-05a6329f2dbf">subdivision 1</intref>, see <intref check="valid" refid="sec.705" target.guid="_1f53eecc-3ab4-4dc9-b738-c77a7c7c8c3d">section 705</intref><intref check="valid" refid="sec.705-para1.a" target.guid="_2c599a8e-f0ff-4040-a326-e4dd2e76478f">(a)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_8187592c-5b9d-4d69-bab5-d2cc6b2c79fb" id="sch.2-def.overlappingATPland_"><txt break.before="1"><defterm guid="_ad32b0fd-74e2-47d0-a2c7-f11b3e4e22a5" id="sch.2-def.overlappingATPland" type="definition">overlapping ATP land</defterm>, for a petroleum lease, see <intref check="valid" refid="sec.341" target.guid="_ca9c79b0-51b0-4864-85ec-99d9057735be">section 341</intref><intref check="valid" refid="sec.341-ssec.2" target.guid="_26b49cc0-42ca-43c1-9b1d-b388d95f1682">(2)</intref><intref check="valid" refid="sec.341-ssec.2-para1.c" target.guid="_bc4f5c7f-c21c-4557-9a3a-a9ebfeeb639f">(c)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_b911d183-4860-4af1-8a67-5ff72e36b74b" id="sch.2-def.overlappingauthorityapplicationperiod_"><txt break.before="1"><defterm guid="_0edf5153-bd3a-488a-83e0-5f17521d5bb1" id="sch.2-def.overlappingauthorityapplicationperiod" type="definition">overlapping authority application period</defterm>, for <intref check="valid" refid="ch.3A" target.guid="_4864cab3-5ae5-49c9-aeb6-cdfaa85590af">chapter 3A</intref>, <intref check="valid" refid="ch.3A-pt.2" target.guid="_01e4b82f-1ea4-4421-943f-62e694596a35">part 2</intref>, <intref check="valid" refid="ch.3A-pt.2-div.5" target.guid="_b954343b-1792-4f81-b46b-7effc0c51d51">division 5</intref>, see <intref check="valid" refid="sec.392AN" target.guid="_f346a204-953b-4842-b64a-9c199a719f43">section 392AN</intref><intref check="valid" refid="sec.392AN-ssec.2" target.guid="_e4b7bfef-7053-436a-a0ec-60ce56481eff">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_40a278ee-fba8-48be-b4aa-5b8c2c32768d" id="sch.2-def.overlappingauthoritygeothermalorGHG_"><txt break.before="1"><defterm guid="_d673db20-f970-428a-b8ea-a01f195af1f6" id="sch.2-def.overlappingauthoritygeothermalorGHG" type="definition">overlapping authority (geothermal or GHG)</defterm>, for <intref check="valid" refid="ch.3A" target.guid="_4864cab3-5ae5-49c9-aeb6-cdfaa85590af">chapter 3A</intref>, see <intref check="valid" refid="sec.392AB" target.guid="_970cd784-7188-4ba9-8593-2ec3fc73eacb">section 392AB</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_4a8f833b-05dc-4a42-80ec-b013da60dc11" id="sch.2-def.overlappingauthoritypriority_"><txt break.before="1"><defterm guid="_1ac47899-4e63-4527-81c0-f79fb82a7801" id="sch.2-def.overlappingauthoritypriority" type="definition">overlapping authority priority</defterm>, for <intref check="valid" refid="ch.3A" target.guid="_4864cab3-5ae5-49c9-aeb6-cdfaa85590af">chapter 3A</intref>, see <intref check="valid" refid="sec.392AH" target.guid="_93b1d0d9-3f3e-4060-b936-3143f1c1a586">section 392AH</intref><intref check="valid" refid="sec.392AH-ssec.3" target.guid="_4c28d939-b5b2-4155-92bb-572d7bc5180c">(3)</intref><intref check="valid" refid="sec.392AH-ssec.3-para1.b" target.guid="_129bd902-9e87-470d-87ba-8a71f928b9fe">(b)</intref><intref check="valid" refid="sec.392AH-ssec.3-para1.b-para2.i" target.guid="_a95f8688-ef7c-4c45-b83b-e2e20791675f">(i)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_0a5e5531-b414-4f1a-8b71-391dd18a439e" id="sch.2-def.overlappinglease_"><txt break.before="1"><defterm guid="_cec595d1-6279-47c1-826d-e76bf42faf36" id="sch.2-def.overlappinglease" type="definition">overlapping lease</defterm>, for <intref check="valid" refid="ch.3A" target.guid="_4864cab3-5ae5-49c9-aeb6-cdfaa85590af">chapter 3A</intref>, see <intref check="valid" refid="sec.392AN" target.guid="_f346a204-953b-4842-b64a-9c199a719f43">section 392AN</intref><intref check="valid" refid="sec.392AN-ssec.2" target.guid="_e4b7bfef-7053-436a-a0ec-60ce56481eff">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_5426d745-ad12-48e5-82a9-b00c60e6be13" id="sch.2-def.overlappingmineralfland_"><txt break.before="1"><defterm guid="_9bf9715d-6244-4c8d-9c40-107001e90226" id="sch.2-def.overlappingmineralfland" type="definition">overlapping mineral (f) land</defterm> see <intref check="valid" refid="sec.363B" target.guid="_a45dc9ac-29cb-4156-b8c7-ba91308a76e4">section 363B</intref><intref check="valid" refid="sec.363B-ssec.1" target.guid="_0e67b7f0-2724-4884-a48c-a30323155801">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_b34613c0-98cb-49ff-9fdf-ea07b94761bb" id="sch.2-def.overlappingpermit_"><txt break.before="1"><defterm guid="_84fc0fe8-59be-4641-8ec3-12514c4d0d3e" id="sch.2-def.overlappingpermit" type="definition">overlapping permit</defterm>, for <intref check="valid" refid="ch.3A" target.guid="_4864cab3-5ae5-49c9-aeb6-cdfaa85590af">chapter 3A</intref>, see <intref check="valid" refid="sec.392AI" target.guid="_2f460ba6-9e2d-4589-9753-b5e5aeec5870">section 392AI</intref><intref check="valid" refid="sec.392AI-ssec.1" target.guid="_e236f5d7-3d37-4114-832b-26d7bc626ef0">(1)</intref><intref check="valid" refid="sec.392AI-ssec.1-para1.a" target.guid="_481248ca-a53c-48aa-a68b-a7b326587587">(a)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_7e2e1447-5ff6-464d-b3e8-c9d837d95712" id="sch.2-def.overlappingtenure_"><txt break.before="1"><defterm guid="_12915b34-1fbb-49a0-9b26-742999bb51f1" id="sch.2-def.overlappingtenure" type="definition">overlapping tenure</defterm>, for <intref check="valid" refid="ch.3A" target.guid="_4864cab3-5ae5-49c9-aeb6-cdfaa85590af">chapter 3A</intref>, see <intref check="valid" refid="sec.392AD" target.guid="_c36ad7f2-8f74-4517-9563-6a7dba62164c">section 392AD</intref><intref check="valid" refid="sec.392AD-para1.c" target.guid="_d27eb2f5-da68-4b79-bf4a-25bc8b5a1fd7">(c)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_2222c08b-ffbf-462b-98e0-cd87d6a9d590" id="sch.2-def.overview_"><txt break.before="1"><defterm guid="_d9deba37-8c53-4f74-9e77-eeaede1e4ffd" id="sch.2-def.overview" type="definition">overview</defterm>, of a safety management system, means a summary of how each aspect of a safety management system mentioned in <intref check="valid" refid="sec.675" target.guid="_28bc8c66-267c-4d67-9a55-97f681bdb4b3">section 675</intref><intref check="valid" refid="sec.675-ssec.1" target.guid="_3c49bcf7-0714-4d0b-b845-2b74352af01a">(1)</intref> is, or will be, addressed by the system.</txt></definition><definition affected.by.uncommenced="0" guid="_3547e7cd-5608-49bc-b569-2c3860b4c0cd" id="sch.2-def.owner_"><txt break.before="1"><defterm guid="_e9988f41-b0e2-4d66-b65a-1e56334a990a" id="sch.2-def.owner" type="definition">owner</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_b2d7cd4d-4e85-45c7-aaaf-27342d92553a" id="sch.2-def.owner-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">An <defterm guid="_1ba926c2-9cc0-4ebd-b09a-dce90f70a452" type="mention">owner</defterm>, of land, means each person as follows in relation to the land—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9731bf82-0f0c-4de6-ba57-aeafbfa788e5" id="sch.2-def.owner-para1.1-para2.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for freehold land—a registered owner;</txt></block></li><li guid="_10aeb22e-7413-4309-8540-7078a2948be6" id="sch.2-def.owner-para1.1-para2.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for land for which a person is, or will on performing conditions, be entitled to a deed of grant in fee simple—the person;</txt></block></li><li guid="_a698fa16-a29f-47eb-b2f6-6addc223ee6a" id="sch.2-def.owner-para1.1-para2.c" provision.type="other"><no>(c)</no><block><txt break.before="0">if an estate in fee simple of land is being purchased from the State—the purchaser;</txt></block></li><li guid="_f6ee110c-e7af-4207-a89d-bf259e053891" id="sch.2-def.owner-para1.1-para2.d" provision.type="other"><no>(d)</no><block><txt break.before="0">for a public road—the public road authority for the road;</txt></block></li><li guid="_49eb9b99-3668-4210-b761-c37d496e1805" id="sch.2-def.owner-para1.1-para2.e" provision.type="other"><no>(e)</no><block><txt break.before="0">for land that is busway land, light rail land, rail corridor land or a cane railway or other railway—the public land authority for the land;</txt></block></li><li guid="_bfbf4dc4-a501-4baf-862a-7e9cac8fd163" id="sch.2-def.owner-para1.1-para2.f" provision.type="other"><no>(f)</no><block><txt break.before="0">for required land under the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-008" target.version.series="060a2469-1586-4719-b2aa-d22cc9ff8daf" type="act"><name emphasis="yes">Transport Infrastructure Act 1994</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.436" target.doc.id="act-1994-008" target.guid="_7246d0c3-ddcc-4dfd-b375-732fe5ed5b19" target.version.series="060a2469-1586-4719-b2aa-d22cc9ff8daf" type="act">section 436</legref>—the chief executive of the department in which that Act is administered;</txt></block></li><li guid="_2b3ee7be-d7c4-455a-905d-ae7120e02667" id="sch.2-def.owner-para1.1-para2.g" provision.type="other"><no>(g)</no><block><txt break.before="0">for a forest entitlement area, State forest or timber reserve under the <legref check="valid" jurisd="QLD" target.doc.id="act-1959-058" target.version.series="05878269-0f72-4d60-b053-3f083a8d73ea" type="act"><name emphasis="yes">Forestry Act 1959</name></legref>—the chief executive of the department in which that Act is administered;</txt></block></li><li guid="_81d8d8c7-2e20-4d85-8ee7-81b5eb6155f7" id="sch.2-def.owner-para1.1-para2.h" provision.type="other"><no>(h)</no><block><txt break.before="0">for a conservation park or resources reserve under the <legref check="valid" jurisd="QLD" target.doc.id="act-1992-020" target.version.series="5a5e324b-388d-450f-843c-b363ee68996c" type="act"><name emphasis="yes">Nature Conservation Act 1992</name></legref> (the <defterm guid="_11a8bcec-83a5-46ee-bd14-4978c2cb5a3a" id="sch.2-def.owner-para1.1-def.NCA" type="definition">NCA</defterm>) for which there are trustees—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9459ca84-c719-4685-9674-88cd25b95ef2" id="sch.2-def.owner-para1.1-para2.h-para3.i" provision.type="other"><no>(i)</no><block><txt break.before="0">if, under the NCA, the park or reserve has trustees whose powers are not restricted—the trustees; or</txt></block></li><li guid="_e8118638-f4a8-480c-bcd1-99787b0a6f4e" id="sch.2-def.owner-para1.1-para2.h-para3.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">otherwise—the chief executive of the department in which the NCA is administered;</txt></block></li></list></block></li><li guid="_d2c658e2-d820-43ce-b3fc-901961bb1481" id="sch.2-def.owner-para1.1-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">for DOGIT land under the <legref check="valid" jurisd="QLD" target.doc.id="act-1991-032" target.version.series="9408f57c-9b40-4ed4-817e-ee06cee2b54e" type="act"><name emphasis="yes">Aboriginal Land Act 1991</name></legref> or the <legref check="valid" jurisd="QLD" target.doc.id="act-1991-033" target.version.series="dbdd7c1d-f4f4-4804-a544-27228a06ed09" type="act"><name emphasis="yes">Torres Strait Islander Land Act 1991</name></legref>—a trustee for the land;</txt></block></li><li guid="_162533ff-f74a-4edd-9e4d-b5295b5353ab" id="sch.2-def.owner-para1.1-para2.k" provision.type="other"><no>(k)</no><block><txt break.before="0">for Aboriginal land under the <legref check="valid" jurisd="QLD" target.doc.id="act-1991-032" target.version.series="9408f57c-9b40-4ed4-817e-ee06cee2b54e" type="act"><name emphasis="yes">Aboriginal Land Act 1991</name></legref> that is taken to be a reserve because of <legref check="valid" jurisd="QLD" refid="sec.202" target.doc.id="act-1991-032" target.guid="_029dc3f4-0e83-4ee1-92f0-547161dc6d73" target.version.series="9408f57c-9b40-4ed4-817e-ee06cee2b54e" type="act">section 202</legref><legref check="invalid" jurisd="QLD" type="act">(2)</legref> or <legref check="invalid" jurisd="QLD" type="act">(4)</legref><legref check="invalid" jurisd="QLD" type="act">(b)</legref> of that Act—the trustee of the land;</txt></block></li><li guid="_f1d60e26-a00a-46bf-a2c1-49568fb279c9" id="sch.2-def.owner-para1.1-para2.ka" provision.type="other"><no>(ka)</no><block><txt break.before="0">for Torres Strait Islander land under the <legref check="valid" jurisd="QLD" target.doc.id="act-1991-033" target.version.series="dbdd7c1d-f4f4-4804-a544-27228a06ed09" type="act"><name emphasis="yes">Torres Strait Islander Land Act 1991</name></legref> that is taken to be a reserve because of <legref check="valid" jurisd="QLD" refid="sec.151" target.doc.id="act-1991-033" target.guid="_12213aac-18a5-490f-8e54-31be8400876e" target.version.series="dbdd7c1d-f4f4-4804-a544-27228a06ed09" type="act">section 151</legref><legref check="invalid" jurisd="QLD" type="act">(2)</legref> of that Act—the trustee of the land;</txt></block></li><li guid="_42d8f3d8-b438-401c-9bef-b41710c1509e" id="sch.2-def.owner-para1.1-para2.l" provision.type="other"><no>(l)</no><block><txt break.before="0">for land under the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-081" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act"><name emphasis="yes">Land Act 1994</name></legref> for which there are trustees—a trustee;</txt></block></li><li guid="_92c6e0b0-16d2-4eba-8f37-a4e124b67351" id="sch.2-def.owner-para1.1-para2.m" provision.type="other"><no>(m)</no><block><txt break.before="0">for transport land under the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-002" target.version.series="cf6c76a3-165d-4adb-aa9c-6eaa674ed46b" type="act"><name emphasis="yes">Transport Planning and Coordination Act 1994</name></legref>—the chief executive of the department in which that Act is administered;</txt></block></li><li guid="_607711f0-6fdf-4301-b214-4ccdf124b9e9" id="sch.2-def.owner-para1.1-para2.n" provision.type="other"><no>(n)</no><block><txt break.before="0">for land vested in the Minister administering the <legref check="valid" jurisd="QLD" target.doc.id="act-2006-039" target.version.series="1e1a0ed5-f492-44f9-ba49-f9194ef5fefb" type="act"><name emphasis="yes">Education (General Provisions) Act 2006</name></legref>—that Minister;</txt></block></li><li guid="_76e4b902-beeb-44ef-9a59-35a55a5ec515" id="sch.2-def.owner-para1.1-para2.o" provision.type="other"><no>(o)</no><block><txt break.before="0">for land vested in the Queensland Housing Commission or another Minister or a chief executive responsible for constructing public buildings—the Minister administering the relevant Act;</txt></block></li><li guid="_37c961c8-a491-436a-a703-0b15079f1fac" id="sch.2-def.owner-para1.1-para2.p" provision.type="other"><no>(p)</no><block><txt break.before="0">for land held from the State under another Act under an interest less than fee simple (other than occupation rights under a permit under the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-081" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act"><name emphasis="yes">Land Act 1994</name></legref>)—the person who holds the interest;</txt></block></li><li guid="_8f17090e-74c3-4423-8937-f7d1681caca6" id="sch.2-def.owner-para1.1-para2.q" provision.type="other"><no>(q)</no><block><txt break.before="0">for any of the following land under the NCA—the State—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_981d2ab6-2db3-444c-b767-c0b8e398a22e" id="sch.2-def.owner-para1.1-para2.q-para3.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a national park (scientific);</txt></block></li><li guid="_de683db5-c2e6-4445-b8d9-e54a3f178e4f" id="sch.2-def.owner-para1.1-para2.q-para3.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a national park;</txt></block></li><li guid="_e8c9bfaf-4efc-455b-868f-74e294513c00" id="sch.2-def.owner-para1.1-para2.q-para3.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">a national park (Aboriginal land);</txt></block></li><li guid="_ef80a259-f35a-4d2b-b969-a78e86963a1d" id="sch.2-def.owner-para1.1-para2.q-para3.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">a national park (Torres Strait Islander land);</txt></block></li><li guid="_665195a4-9dae-4e8d-8fe3-14c715acdd39" id="sch.2-def.owner-para1.1-para2.q-para3.v" provision.type="other"><no>(v)</no><block><txt break.before="0">a forest reserve.</txt></block></li></list></block></li></list></block></li><li guid="_f55a63fa-e60a-4001-88dd-27f32fa88c25" id="sch.2-def.owner-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">Also, a mortgagee of land is the <defterm guid="_9a5b9b0a-f741-41ec-886a-1af59e8f1b1b" type="mention">owner</defterm> of land if—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_6154d8b0-83e9-4371-ad9a-058f0ee83d2e" id="sch.2-def.owner-para1.2-para2.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the mortgagee is acting as mortgagee in possession of the land and has the exclusive management and control of the land; or</txt></block></li><li guid="_49ef789e-dbac-49d7-ab51-d85f360e7fa1" id="sch.2-def.owner-para1.2-para2.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the mortgagee, or a person appointed by the mortgagee, is in possession of the land and has the exclusive management and control of the land.</txt></block></li></list></block></li><li guid="_356266be-be8b-4d38-99f2-fb22b70413b2" id="sch.2-def.owner-para1.3" provision.type="other"><no>3</no><block><txt break.before="0">The <defterm guid="_66a52ed5-7f80-456b-b977-c680b90c71e9" type="mention">owner</defterm>, of a thing that has been seized under this Act, includes a person who would be entitled to possession of the thing had it not been seized.</txt></block></li><li guid="_9c12b588-f168-4394-89fe-2d60258a0670" id="sch.2-def.owner-para1.4" provision.type="other"><no>4</no><block><txt break.before="0">If land or another thing has more than 1 owner, a reference in this Act to the owner of the land or thing is a reference to each of its owners.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_c0ac9dfe-1a27-4952-b844-98f5c9e26ce9" id="sch.2-def.ownershiprelinquishmentnotice_"><txt break.before="1"><defterm guid="_c9f5ba29-30e7-4cfd-b3c6-36c5b1839ddd" id="sch.2-def.ownershiprelinquishmentnotice" type="definition">ownership relinquishment notice</defterm> see <intref check="valid" refid="sec.223" target.guid="_e08ee895-e80a-47f5-a4ec-6185ba4fa7d7">section 223</intref><intref check="valid" refid="sec.223-ssec.3" target.guid="_fc7891bf-434a-4950-a09e-d7017751ccba">(3)</intref><intref check="valid" refid="sec.223-ssec.3-para1.b" target.guid="_84a2f71c-d665-441a-a306-bb0d6c9ca854">(b)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_f6e3a15b-5fdc-4668-ab74-39006de790e0" id="sch.2-def.part5permission_"><txt break.before="1"><defterm guid="_9a0454aa-84c5-4cd2-8061-58ffee145aa6" id="sch.2-def.part5permission" type="definition">part 5 permission</defterm> see <intref check="valid" refid="sec.463" target.guid="_6a2f932f-bd5e-4ea8-88d4-afe2d0d765e3">section 463</intref>.</txt></definition><definition affected.by.uncommenced="0" change="del" guid="_46752837-b8b6-4a38-a60e-abc5140eb2b5-del" id="sch.2-def.parties_-del"><txt break.before="1"><defterm guid="_aa9bde06-6e1a-45a7-9005-5588567545db-del" id="sch.2-def.parties-del" type="definition">parties</defterm>, for <intref check="valid" refid="ch.10" target.guid="_c24d1b74-938d-44f7-b0f2-d23cd9205275">chapter 10</intref>, <intref check="valid" refid="ch.10-pt.1AA" target.guid="_4b420ef3-c40c-49f1-abe5-a4aeccaee0a4">part 1AA</intref>, see <intref check="valid" refid="sec.734C" target.guid="_c5b0c30f-0b77-49cf-b234-51c070a75b7c">section 734C</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_b30728c2-4b66-455a-9f8c-c2819fb6626c" id="sch.2-def.petroleum_"><txt break.before="1"><defterm guid="_eb453f0f-7e2c-45a6-9d68-e25ee1cfff5e" id="sch.2-def.petroleum" type="definition">petroleum</defterm> see <intref check="valid" refid="sec.10" target.guid="_72045839-9d2e-419b-8103-da2e9f726b64">section 10</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_141ddf89-5593-4f9e-8d20-c927ca29458a" id="sch.2-def.petroleumauthority_"><txt break.before="1"><defterm guid="_9e2a684e-e863-4d96-a50f-29e9521f8368" id="sch.2-def.petroleumauthority" type="definition">petroleum authority</defterm> see <intref check="valid" refid="sec.18" target.guid="_00606342-13a2-49f5-a337-6c1f809e1f2e">section 18</intref><intref check="valid" refid="sec.18-ssec.2" target.guid="_3adfe92d-b344-428c-a5b7-9599d1993a99">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_5f77670a-87f6-4dfd-888a-88f3c8612186" id="sch.2-def.petroleumdiscovery_"><txt break.before="1"><defterm guid="_21653223-dfe3-4707-8663-1913af53db04" id="sch.2-def.petroleumdiscovery" type="definition">petroleum discovery</defterm> includes a discovery of a natural underground reservoir that has, or is likely to have, commercial storage potential under this Act.</txt></definition><definition affected.by.uncommenced="0" guid="_0420df63-c3d4-415a-9985-6159d815be63" id="sch.2-def.petroleumfacility_"><txt break.before="1"><defterm guid="_7236eb7c-0186-4ca7-8412-ea218346d1c0" id="sch.2-def.petroleumfacility" type="definition">petroleum facility</defterm> see <intref check="valid" refid="sec.17" target.guid="_cbd5c9f4-7113-4f11-812f-5f00726c8404">section 17</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_d746f4fa-4879-4f80-9a63-f4d2693541a3" id="sch.2-def.petroleumfacilityland_"><txt break.before="1"><defterm guid="_b75d878a-e011-413f-85af-3837b7ed0120" id="sch.2-def.petroleumfacilityland" type="definition">petroleum facility land</defterm>, for a petroleum facility licence, see <intref check="valid" refid="sec.439" target.guid="_9af73335-3c60-40ed-99ba-4d0f479b3f1d">section 439</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_08a18a5f-4561-4766-a675-f4280be6ee81" id="sch.2-def.petroleumfacilitylicence_"><txt break.before="1"><defterm guid="_e693afae-99af-4ff5-bc50-442af0c31282" id="sch.2-def.petroleumfacilitylicence" type="definition">petroleum facility licence</defterm> see <intref check="valid" refid="sec.18" target.guid="_00606342-13a2-49f5-a337-6c1f809e1f2e">section 18</intref><intref check="valid" refid="sec.18-ssec.1" target.guid="_b50a8cff-43ef-47e2-9531-603839cf5b0c">(1)</intref><intref check="valid" refid="sec.18-ssec.1-para1.g" target.guid="_104ff9fe-c6b1-4c3d-8a69-5ab0c8741754">(g)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_01c6e8e9-105c-41ba-a5d3-b06d2d805ecf" id="sch.2-def.petroleuminterest_"><txt break.before="1"><defterm guid="_9923863b-aeb4-4e8a-a6dc-985ad5bcb339" id="sch.2-def.petroleuminterest" type="definition">petroleum interest</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_209871e4-c0d6-4575-be6a-f8ffd0dd02c5" id="sch.2-def.petroleuminterest-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a petroleum authority; or</txt></block></li><li guid="_92e936a5-b95b-498e-a879-708ef68671ed" id="sch.2-def.petroleuminterest-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a right existing under, or in relation to, a petroleum authority.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_a1dda242-daf6-409f-a6c0-8e2192cc1e1a" id="sch.2-def.petroleumlease_"><txt break.before="1"><defterm guid="_bc8599e6-2b0d-4e3d-a894-2a59887a07c6" id="sch.2-def.petroleumlease" type="definition">petroleum lease</defterm> see <intref check="valid" refid="sec.18" target.guid="_00606342-13a2-49f5-a337-6c1f809e1f2e">section 18</intref><intref check="valid" refid="sec.18-ssec.1" target.guid="_b50a8cff-43ef-47e2-9531-603839cf5b0c">(1)</intref><intref check="valid" refid="sec.18-ssec.1-para1.b" target.guid="_d5a29c42-14ec-4d5a-b77f-952f35c9ca43">(b)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_5246d92d-a248-4add-8825-0ee7657da5f3" id="sch.2-def.petroleumproducer_"><txt break.before="1"><defterm guid="_af723852-3167-4796-b1e1-ed13653366ba" id="sch.2-def.petroleumproducer" type="definition">petroleum producer</defterm> includes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ed655305-5ca4-4ea1-abe0-cda4781e5c60" id="sch.2-def.petroleumproducer-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for petroleum produced under this Act—the petroleum tenure holder who produces it or for whom it is produced; or</txt></block></li><li guid="_b81edc61-d037-42e8-8abc-96a02b11ee96" id="sch.2-def.petroleumproducer-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for petroleum produced under the <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref>—the authority to prospect holder or petroleum lease holder under that Act who produces it or for whom it is produced; or</txt></block></li><li guid="_d83765e8-458b-4138-839e-363aa026b61b" id="sch.2-def.petroleumproducer-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">for petroleum that is incidental coal seam gas mined under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.318CM" target.doc.id="act-1989-110" target.guid="_c4cd0783-ee07-423e-9341-195a04b0637e" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 318CM</legref>—the coal or oil shale mining lease holder who mines it or for whom it is mined; or</txt></block></li><li guid="_02dddd0e-b0bf-48ea-b95a-4f217e9497f8" id="sch.2-def.petroleumproducer-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">for petroleum that is coal seam gas mined under a mineral hydrocarbon mining lease—the coal or oil shale mining lease holder who mines it or for whom it is mined.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_c33ff10b-9a25-4021-b90b-715e79060273" id="sch.2-def.petroleumroyalty_"><txt break.before="1"><defterm guid="_3c9ac747-ab57-4f9f-b51a-449266dae0af" id="sch.2-def.petroleumroyalty" type="definition">petroleum royalty</defterm> means petroleum royalty imposed under <intref check="valid" refid="sec.590" target.guid="_ff4f91a4-c257-4867-b95d-a7d959d6317b">section 590</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_f636e511-4bcf-4884-87c5-9019fe12174e" id="sch.2-def.petroleumtenure_"><txt break.before="1"><defterm guid="_13c92c00-1e1e-4e43-a5cb-49d98a9df4b7" id="sch.2-def.petroleumtenure" type="definition">petroleum tenure</defterm> see <intref check="valid" refid="sec.18" target.guid="_00606342-13a2-49f5-a337-6c1f809e1f2e">section 18</intref><intref check="valid" refid="sec.18-ssec.3" target.guid="_3b8d89c3-407b-4e6a-b812-bafef26247b1">(3)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_69c29173-f8fa-4d51-b173-aeabe8bf4d98" id="sch.2-def.petroleumwell_"><txt break.before="1"><defterm guid="_58d0300f-401f-424e-8702-aaef47034372" id="sch.2-def.petroleumwell" type="definition">petroleum well</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_f9e5ef55-f431-4883-a396-9bfc30e02132" id="sch.2-def.petroleumwell-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">A <defterm guid="_1bad8145-3f93-46f0-883a-916df08fe969" type="mention">petroleum well</defterm> is a hole in the ground made or being made by drilling, boring or any other means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_19f76b85-5987-4e0d-8a86-729b1055dba6" id="sch.2-def.petroleumwell-para1.1-para2.a" provision.type="other"><no>(a)</no><block><txt break.before="0">to explore for or produce petroleum; or</txt></block></li><li guid="_e795ee5a-7f5a-4320-b962-327c2b33009e" id="sch.2-def.petroleumwell-para1.1-para2.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to inject petroleum or a prescribed storage gas into a natural underground reservoir; or</txt></block></li><li guid="_cca844ac-1607-4b57-94e1-82d2ab0b97dc" id="sch.2-def.petroleumwell-para1.1-para2.c" provision.type="other"><no>(c)</no><block><txt break.before="0">through which petroleum or a prescribed storage gas may be produced.</txt></block></li></list></block></li><li guid="_355dc61e-e134-47cd-8bca-4d48094a19a7" id="sch.2-def.petroleumwell-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">For item 1, a prescribed storage gas is produced when it is recovered or released to ground level from a natural underground reservoir in which it has been contained or from which it is extracted.</txt></block></li><li guid="_a4ecf666-bf82-40f1-8d7d-17157f13f6b6" id="sch.2-def.petroleumwell-para1.3" provision.type="other"><no>3</no><block><txt break.before="0">A <defterm guid="_68442249-638d-4654-aa47-ab83cec30ec2" type="mention">petroleum well</defterm> includes the casing for the well and any wellhead for the well attached to it.</txt></block></li><li guid="_f37edc3e-3b95-479f-9575-f7cebdb34724" id="sch.2-def.petroleumwell-para1.4" provision.type="other"><no>4</no><block><txt break.before="0">To remove any doubt, it is declared that a <defterm guid="_06118222-60e7-462c-a400-786fc1e71478" type="mention">petroleum well </defterm>does not include any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_95492a8e-1bfb-404e-9408-69eba2f4c943" id="sch.2-def.petroleumwell-para1.4-para2.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a water injection bore;</txt></block></li><li guid="_e0ee573d-fc7d-4a2c-a190-8b574b5134da" id="sch.2-def.petroleumwell-para1.4-para2.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a water observation bore;</txt></block></li><li guid="_1bf61409-527e-4665-956f-11adf65f755b" id="sch.2-def.petroleumwell-para1.4-para2.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a water supply bore;</txt></block></li><li guid="_44eb8d3c-a0a9-4304-a9ec-db2a44443b0a" id="sch.2-def.petroleumwell-para1.4-para2.d" provision.type="other"><no>(d)</no><block><txt break.before="0">an existing <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref> bore;</txt></block></li><li guid="_d176ee8f-1d55-4f60-b2f5-2da9a07c5b62" id="sch.2-def.petroleumwell-para1.4-para2.e" provision.type="other"><no>(e)</no><block><txt break.before="0">a seismic shot hole or shallow hole drilled to work out a geological structure.</txt></block></li></list></block></li></list></definition><definition affected.by.uncommenced="0" guid="_1e1ba981-55da-49c7-ac60-f1ce73fb59e9" id="sch.2-def.PGPLR_"><txt break.before="1"><defterm guid="_b0b94d9d-297c-4b4a-821d-aed499d02461" id="sch.2-def.PGPLR" type="definition">PGPLR</defterm> means Prospective Gas Production Land Reserve.</txt></definition><definition affected.by.uncommenced="0" guid="_9830eda2-1e76-463a-8f1a-1022008690e7" id="sch.2-def.PGPLRland_"><txt break.before="1"><defterm guid="_c7df7060-c45b-4318-a0a9-c596419dddf8" id="sch.2-def.PGPLRland" type="definition">PGPLR land</defterm> means the part of the area of a petroleum tenure to which an Australian market supply condition applies.</txt></definition><definition affected.by.uncommenced="0" guid="_a5d844c1-f868-49ee-b555-e982fa1adf65" id="sch.2-def.pipeline_"><txt break.before="1"><defterm guid="_d8ce5aa3-5d15-4760-ac52-3ebf0e48d807" id="sch.2-def.pipeline" type="definition">pipeline</defterm> see <intref check="valid" refid="sec.16" target.guid="_78b3e1f4-de3e-4047-b212-fc9d0c03967e">section 16</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_12cd2959-3942-4799-9185-fd692fa4336b" id="sch.2-def.pipelineland_"><txt break.before="1"><defterm guid="_79d0195c-ca02-4987-994c-2ed4ee1112ae" id="sch.2-def.pipelineland" type="definition">pipeline land</defterm>, for a pipeline licence, see <intref check="valid" refid="sec.399" target.guid="_7fbe28f5-08ea-4146-a14a-6c09745bc778">section 399</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_7036d3c9-81c1-4629-869f-88d77d18ba83" id="sch.2-def.pipelinelicence_"><txt break.before="1"><defterm guid="_bd274f29-cfc5-42e6-a4e2-0347f2e84a18" id="sch.2-def.pipelinelicence" type="definition">pipeline licence</defterm> see <intref check="valid" refid="sec.18" target.guid="_00606342-13a2-49f5-a337-6c1f809e1f2e">section 18</intref><intref check="valid" refid="sec.18-ssec.1" target.guid="_b50a8cff-43ef-47e2-9531-603839cf5b0c">(1)</intref><intref check="valid" refid="sec.18-ssec.1-para1.f" target.guid="_5b1a11d7-6b69-43a9-9ec0-a0cf4cd0d4d4">(f)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_b8c0f670-1945-47a7-baca-34841b19f4e3" id="sch.2-def.place_"><txt break.before="1"><defterm guid="_c9ef3c0e-3c12-4519-9fe4-091235e53d19" id="sch.2-def.place" type="definition">place</defterm> includes land.</txt></definition><definition affected.by.uncommenced="0" guid="_abc08049-883f-4e43-aed1-fba8e27813a9" id="sch.2-def.planperiod_"><txt break.before="1"><defterm guid="_53b85466-81e5-4791-9321-8b3f4a80ac0b" id="sch.2-def.planperiod" type="definition">plan period</defterm>, for a development plan, means the period for which the plan applies.</txt></definition><definition affected.by.uncommenced="0" guid="_6ff6f1b5-7d57-438e-986b-958fdbe469db" id="sch.2-def.PLproductiontesting_"><txt break.before="1"><defterm guid="_db19e05c-763f-475e-9e9f-ee661fa5cce0" id="sch.2-def.PLproductiontesting" type="definition">PL production testing</defterm> see <intref check="valid" refid="sec.150A" target.guid="_28d5e4f1-45d3-4468-a0c8-c40686dec0cf">section 150A</intref><intref check="valid" refid="sec.150A-ssec.1" target.guid="_7a693512-7345-4f9e-ac80-1584a769390b">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_d68e31a3-02e7-45f6-8532-1a3923699b9e" id="sch.2-def.PLstoragetesting_"><txt break.before="1"><defterm guid="_203d9723-52e2-46f8-90cf-130dfcb24210" id="sch.2-def.PLstoragetesting" type="definition">PL storage testing</defterm> see <intref check="valid" refid="sec.150C" target.guid="_c8284da4-5701-4f54-ade5-52a0612f7e9d">section 150C</intref><intref check="valid" refid="sec.150C-ssec.1" target.guid="_0e19e5ef-f14f-4c97-b6ce-066dc1b7c325">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_f9c242f5-80e7-4029-8f31-91bc47778de6" id="sch.2-def.pointtopointpipelinelicence_"><txt break.before="1"><defterm guid="_cede270a-4a7e-40f7-b92f-1383236f6b4e" id="sch.2-def.pointtopointpipelinelicence" type="definition">point-to-point pipeline licence</defterm> see <intref check="valid" refid="sec.404" target.guid="_851fee35-9607-48d6-8329-f130f2f824f1">section 404</intref><intref check="invalid" refid="sec.404-ssec.1">(1)</intref><intref check="invalid" refid="sec.404-ssec.1-para1.b">(b)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_40e39d6e-cffa-49a5-ad59-81d5b637f8dd" id="sch.2-def.potentialcommercialarea_"><txt break.before="1"><defterm guid="_096a717b-7185-4d02-8da6-cc87c7b397b2" id="sch.2-def.potentialcommercialarea" type="definition">potential commercial area</defterm>, for an authority to prospect, means an area declared under <intref check="valid" refid="sec.90" target.guid="_4cf0271e-3445-4bd2-9952-79cfb23d50db">section 90</intref> to be a potential commercial area for the authority.</txt></definition><definition affected.by.uncommenced="0" guid="_2e690095-0dbf-4394-9bdb-bfc08c614afc" id="sch.2-def.powerstation_"><txt break.before="1"><defterm guid="_b17699c1-b921-4f83-9cca-40b52cc1716d" id="sch.2-def.powerstation" type="definition">power station</defterm> means a power station under the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-064" target.version.series="9906752b-4e97-4fa7-8f1e-9e2cbb7fb2b6" type="act"><name emphasis="yes">Electricity Act 1994</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_b04eeef7-595f-44ca-8e66-3212dd98163f" id="sch.2-def.preclosurereport_"><txt break.before="1"><defterm guid="_2cd38d93-ab21-417d-bc38-c19b66e1cb3c" id="sch.2-def.preclosurereport" type="definition">pre-closure report</defterm> see <intref check="valid" refid="sec.261" target.guid="_2e834b8f-38dc-4249-93aa-dd9aab37e4e3">section 261</intref><intref check="invalid" refid="sec.261-ssec.1">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_534256fb-6126-4261-b4f1-154531673847" id="sch.2-def.preferencedecision_"><txt break.before="1"><defterm guid="_15d7d379-afbf-4352-9d05-7e696172ad2a" id="sch.2-def.preferencedecision" type="definition">preference decision</defterm> see <intref check="valid" refid="sec.319" target.guid="_db7da69c-4cee-411e-becc-d43793db5333">section 319</intref><intref check="valid" refid="sec.319-ssec.2" target.guid="_87140eec-2e55-4239-b3b7-cfc86614fa9a">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_9ea97f62-c0b8-4d9d-aea9-648edffc5166" id="sch.2-def.prescribedincidents_"><txt break.before="1"><defterm guid="_03d4ba0f-f528-4205-ac48-fc0a4e4c39e4" id="sch.2-def.prescribedincidents" type="definition">prescribed incidents</defterm> see <intref check="valid" refid="sec.706" target.guid="_a8d332d7-5795-463d-9635-62b4bac5786d">section 706</intref><intref check="valid" refid="sec.706-ssec.1" target.guid="_1190838a-5fcd-46c2-bc0b-b8126cfd8350">(1)</intref><intref check="valid" refid="sec.706-ssec.1-para1.a" target.guid="_47624d9b-dc72-46fd-ba3f-aac3aadca708">(a)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_be2b7f35-2a0a-4ba4-b192-3581625bdfb2" id="sch.2-def.prescribedodour_"><txt break.before="1"><defterm guid="_7b6bf758-ca23-4e2b-af98-b617f700dd9a" id="sch.2-def.prescribedodour" type="definition">prescribed odour</defterm>, for fuel gas, see <intref check="valid" refid="sec.627" target.guid="_04e7c072-d69e-4555-8ee8-f33911d27b6d">section 627</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_3ffe798d-9813-488e-ad03-3d5521917dbc" id="sch.2-def.prescribedquality_"><txt break.before="1"><defterm guid="_3a41c099-23d7-42c2-bdfc-e68a589d364a" id="sch.2-def.prescribedquality" type="definition">prescribed quality</defterm>, for fuel gas, see <intref check="valid" refid="sec.620" target.guid="_0135c9b2-4f4d-4d89-99e9-e40b5b62a37e">section 620</intref><intref check="valid" refid="sec.620-ssec.1" target.guid="_97d48d1e-ce4d-4503-919a-e55e88d2b364">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_bfa7e23e-5ab7-4526-ad5d-4c25c6521dae" id="sch.2-def.prescribedstoragegas_"><txt break.before="1"><defterm guid="_807129c4-a7d7-4099-b146-f5f9d80fd39f" id="sch.2-def.prescribedstoragegas" type="definition">prescribed storage gas</defterm> see <intref check="valid" refid="sec.12" target.guid="_e70f162e-af12-4cd5-8352-b5f6ed852aee">section 12</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_02ed8dcd-9c21-420d-8f0a-73caf5f0a0d6" id="sch.2-def.prevent_"><txt break.before="1"><defterm guid="_5e95b2b0-2698-49ed-aaeb-b8f720c55861" id="sch.2-def.prevent" type="definition">prevent</defterm> includes each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1e2ffa74-990e-4996-bd71-521fd2831521" id="sch.2-def.prevent-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">hinder;</txt></block></li><li guid="_f0e1e56e-09b1-427f-b6f7-2e7084ab577b" id="sch.2-def.prevent-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">obstruct.</txt></block></li></list></definition><definition affected.by.uncommenced="0" change="del" guid="_dc13954c-9c72-4685-bb86-a2c2de8f74cc-del" id="sch.2-def.primaryland_-del"><txt break.before="1"><defterm guid="_f5b9fa56-9fa5-432c-86a3-42abd191d928-del" id="sch.2-def.primaryland-del" type="definition">primary land</defterm>, for an abandoned operating plant, for <intref check="valid" refid="ch.10" target.guid="_c24d1b74-938d-44f7-b0f2-d23cd9205275">chapter 10</intref>, <intref check="valid" refid="ch.10-pt.3" target.guid="_ab9c9b86-73cb-4fe7-8c14-ab67d64b2ca8">part 3</intref>, see <intref check="valid" refid="sec.799B" target.guid="_64f3af6d-5b3f-4fb5-99d5-00bc8c6a6867">section 799B</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_88063419-52dd-42fd-b61f-26ebebc2e088" id="sch.2-def.privateland_"><txt break.before="1"><defterm guid="_2f027c12-a0fd-4d44-8f36-09314723d44b" id="sch.2-def.privateland" type="definition">private land</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_315ce9e9-52fa-4f5f-93c9-990768b5916d" id="sch.2-def.privateland-para1.1" provision.type="other"><no>1</no><block><txt break.before="0"><defterm guid="_13881c2c-b232-4f40-9d99-84d338b9e9ef" type="mention">Private land</defterm> is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_106d512a-ce32-463f-8e7c-8f75fa4610f7" id="sch.2-def.privateland-para1.1-para2.a" provision.type="other"><no>(a)</no><block><txt break.before="0">freehold land, including Aboriginal land under the <legref check="valid" jurisd="QLD" target.doc.id="act-1991-032" target.version.series="9408f57c-9b40-4ed4-817e-ee06cee2b54e" type="act"><name emphasis="yes">Aboriginal Land Act 1991</name></legref> and Torres Strait Islander land under the <legref check="valid" jurisd="QLD" target.doc.id="act-1991-033" target.version.series="dbdd7c1d-f4f4-4804-a544-27228a06ed09" type="act"><name emphasis="yes">Torres Strait Islander Land Act 1991</name></legref>; or</txt></block></li><li guid="_da598eb5-a69c-4cb5-b321-3ffa48092dcb" id="sch.2-def.privateland-para1.1-para2.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an interest in land less than fee simple held from the State under another Act.</txt></block></li></list></block></li><li guid="_f0eb4f9b-a6a8-400f-8fbe-35f0b27277c1" id="sch.2-def.privateland-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">However, land is not private land to the extent of an interest in any of the following relating to the land—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e3e44923-22bf-4e41-9824-153cbec53a08" id="sch.2-def.privateland-para1.2-para2.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a mining interest;</txt></block></li><li guid="_3ea71ffb-67f4-48ff-b792-62ea04577c01" id="sch.2-def.privateland-para1.2-para2.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a petroleum authority or <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> petroleum tenure;</txt></block></li><li guid="_1bbca82b-a3c7-40b0-a3c9-138ad5a785fa" id="sch.2-def.privateland-para1.2-para2.c" provision.type="other"><no>(c)</no><block><txt break.before="0">a GHG authority;</txt></block></li><li guid="_07ea020e-6b76-4435-acbd-d22d0de25a79" id="sch.2-def.privateland-para1.2-para2.d" provision.type="other"><no>(d)</no><block><txt break.before="0">a geothermal tenure;</txt></block></li><li guid="_88261f3c-2a05-417f-81d7-871c84b9a9e9" id="sch.2-def.privateland-para1.2-para2.e" provision.type="other"><no>(e)</no><block><txt break.before="0">an occupation right under a permit under the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-081" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act"><name emphasis="yes">Land Act 1994</name></legref>.</txt></block></li></list></block></li><li guid="_e33b31cc-521b-4269-8ac6-fc19c119e842" id="sch.2-def.privateland-para1.3" provision.type="other"><no>3</no><block><txt break.before="0">Also, land owned by a public land authority is not private land.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_1f9439b7-4750-4088-90f3-0ac336a5ddd8" id="sch.2-def.produced_"><txt break.before="1"><defterm guid="_5887471d-b4ef-406f-b3e2-7fb4c2cf7f4f" id="sch.2-def.produced" type="definition">produced</defterm>, for petroleum, see <intref check="valid" refid="sec.15" target.guid="_3d48db0b-7c52-45ec-b197-5f9305ee58cf">section 15</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_a2368758-d8fb-4438-8606-e099c1e5c006" id="sch.2-def.producedwater_"><txt break.before="1"><defterm guid="_4b6a062d-8226-4528-b5b6-8e68e45881a8" id="sch.2-def.producedwater" type="definition">produced water</defterm> see <intref check="valid" refid="sec.15A" target.guid="_2ba386e8-5535-4255-9a5f-19ce762e5913">section 15A</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_ccdd3fb9-3aab-40ff-81a8-3146472b1883" id="sch.2-def.productioncommencementday_"><txt break.before="1"><defterm guid="_dc2e0e03-cad0-4e5e-ba5a-28fb69a368da" id="sch.2-def.productioncommencementday" type="definition">production commencement day</defterm>, for a petroleum lease, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7a1c2a8c-046d-468c-aec6-87b5a5c08f9c" id="sch.2-def.productioncommencementday-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the day stated under <intref check="valid" refid="sec.123" target.guid="_ef44ece4-3399-4e95-8180-52c9dbb8d1b6">section 123</intref><intref check="valid" refid="sec.123-ssec.3" target.guid="_b5ebfb94-60a1-44eb-aa8e-7e01c9b61fed">(3)</intref><intref check="valid" refid="sec.123-ssec.3-para1.c" target.guid="_9eea8ce9-dcbb-4e86-a376-f47fb5d1a7c0">(c)</intref> for the lease; or</txt></block></li><li guid="_42fc68dc-03b5-4d06-8380-7c568afb5690" id="sch.2-def.productioncommencementday-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if the day mentioned in <intref check="valid" refid="sch.2-def.productioncommencementday-para1.a" target.guid="_7a1c2a8c-046d-468c-aec6-87b5a5c08f9c">paragraph (a)</intref> has been changed under <intref check="valid" refid="sec.175AC" target.guid="_5586affa-d80c-49ef-8251-aab54675e72c">section 175AC</intref>—that day as changed from time to time under <intref check="valid" refid="sec.175AC" target.guid="_5586affa-d80c-49ef-8251-aab54675e72c">section 175AC</intref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_3d0d6488-f236-4cf0-9206-d69ea8858a0f" id="sch.2-def.programperiod_"><txt break.before="1"><defterm guid="_3ea5ac86-f337-4847-9e75-ba02637d9006" id="sch.2-def.programperiod" type="definition">program period</defterm>, for a work program, means the period for which the program applies.</txt></definition><definition affected.by.uncommenced="0" guid="_d78583ee-0763-467a-ab66-d7314983fa0f" id="sch.2-def.proposeduser_"><txt break.before="1"><defterm guid="_2ebe6c1a-1a57-4491-8349-1812fe54c759" id="sch.2-def.proposeduser" type="definition">proposed user</defterm>, of a natural underground reservoir, see <intref check="valid" refid="sec.209" target.guid="_630465ba-d1c7-4684-bfd3-ebeb14858755">section 209</intref><intref check="valid" refid="sec.209-ssec.1" target.guid="_974dedb7-972d-4881-a676-e70844cefbab">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_7623913c-05fa-4dd1-b574-5370bffbb4c2" id="sch.2-def.provision_"><txt break.before="1"><defterm guid="_00b7ead1-7f0a-496a-87f5-b29773a38d31" id="sch.2-def.provision" type="definition">provision</defterm> of an authority under this Act, means a provision of the authority, as defined under <intref check="valid" refid="sec.21" target.guid="_5a6221e3-ad92-492e-b1a0-6e6270828910">section 21</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_a9d9d80c-8382-4d98-ae91-24b8ac236a85" id="sch.2-def.publicland_"><txt break.before="1"><defterm guid="_0d8ff4ce-9323-44f5-8fbc-a0eb3011e7a8" id="sch.2-def.publicland" type="definition">public land</defterm> means land other than—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_cd5813c0-b898-41d6-b7c1-b3ac2dc98908" id="sch.2-def.publicland-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">private land; or</txt></block></li><li guid="_83a3f14e-73af-4a0e-98bb-3f30564acfcf" id="sch.2-def.publicland-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">to the extent an interest in any of the following relates to the land—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_07ee1eea-a351-4376-8ea2-fe70c33dcf6e" id="sch.2-def.publicland-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">a mining interest;</txt></block></li><li guid="_343c7b0d-39ba-415c-b260-b6cdbec5652b" id="sch.2-def.publicland-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">a petroleum authority or <legref check="valid" jurisd="QLD" target.doc.id="act-1923-026" target.version.series="47af415a-ed2d-4983-97e7-37a768bf0731" type="act"><name emphasis="no">1923 Act</name></legref> petroleum tenure;</txt></block></li><li guid="_7a6c20ca-c393-4e94-af62-0fc2654fd682" id="sch.2-def.publicland-para1.b-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0">a GHG authority;</txt></block></li><li guid="_d58e65f0-5c89-43d4-8625-b672414090ee" id="sch.2-def.publicland-para1.b-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">a geothermal tenure;</txt></block></li><li guid="_cc815688-add3-44c4-8623-5506ad5baa7d" id="sch.2-def.publicland-para1.b-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">an occupation right under a permit under the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-081" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act"><name emphasis="yes">Land Act 1994</name></legref>.</txt></block></li></list></block></li></list></definition><definition affected.by.uncommenced="0" guid="_d43e8935-d142-4692-a38e-1e03f23a5bca" id="sch.2-def.publiclandauthority_"><txt break.before="1"><defterm guid="_30f5702a-c6c4-4d7c-b2f5-068b67b3abe3" id="sch.2-def.publiclandauthority" type="definition">public land authority</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3aa37bc6-63fd-426b-b85e-037c553bf242" id="sch.2-def.publiclandauthority-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for a public road—the road authority for the road; or</txt></block></li><li guid="_2f3360b2-cb21-4dfa-8826-e1a2d251cc15" id="sch.2-def.publiclandauthority-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">if a local government or other authority is, under an Act, charged with the control of the land—the local government or other authority; or</txt></block></li><li guid="_883ccefc-d338-421b-9699-a3f852c416cf" id="sch.2-def.publiclandauthority-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">otherwise—the chief executive of the department administering the <legref check="valid" jurisd="QLD" target.doc.id="act-2004-025" target.version.series="2c308bed-17a0-4332-b2f4-ebb90f42c997" type="act">Act</legref> under which entry to the land is administered.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_737d31d5-6607-47d1-a3e4-41170408b49d" id="sch.2-def.publicofficial_"><txt break.before="1"><defterm guid="_54e82152-f1e7-4aa2-9a37-987a4e5ca99e" id="sch.2-def.publicofficial" type="definition">public official</defterm>, for <intref check="valid" refid="ch.6" target.guid="_1179c65a-355e-4281-a616-c3e83927d1e4">chapter 6</intref>, <intref check="valid" refid="ch.6-pt.5" target.guid="_89f29890-11e0-48d3-957e-cf4b610fc40a">part 5</intref>, see <intref check="valid" refid="sec.617A" target.guid="_0a869716-ecec-4789-b1d3-f8e26829d45f">section 617A</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_1a54202e-bd4a-4d6b-a6dd-378034a2ffb8" id="sch.2-def.publicroad_"><txt break.before="1"><defterm guid="_baa9084d-5fa3-482d-ab0d-a7bd1bf16ae0" id="sch.2-def.publicroad" type="definition">public road</defterm> means an area of land that—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ae33c118-56a4-44bb-bf96-dc0b0a69e12f" id="sch.2-def.publicroad-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">is open to, or used by, the public; and</txt></block></li><li guid="_b55f7eee-4bf9-49a6-a83f-e52c44147e1e" id="sch.2-def.publicroad-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">is developed for, or has as one of its main uses—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_bfc8e032-572b-42fb-b588-13160a226fe8" id="sch.2-def.publicroad-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the driving or riding of motor vehicles; or</txt></block></li><li guid="_86c522ac-db99-4a58-84b4-dfcda2598b92" id="sch.2-def.publicroad-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">pedestrian traffic; and</txt></block></li></list></block></li><li guid="_bab87899-9719-42a5-8c8e-1760e3f43734" id="sch.2-def.publicroad-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">is controlled by a public road authority.</txt></block></li></list><note guid="_a5a42080-7700-4cc1-aa55-652165591b9d" id="sch.2-def.publicroad-note" type="example"><heading guid="_847d4f2a-1e74-4f44-9fa2-05ce16b789df" id="sch.2-def.publicroad-note-he">Examples of an area of land that may be included in a road—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_cadbc493-6299-457e-837a-750551fe95c9" id="sch.2-def.publicroad-note-para1" provision.type="other"><no>•</no><block><txt break.before="0">a bridge, culvert, ford, tunnel or viaduct</txt></block></li><li guid="_1a180a8b-1f26-4fb1-bf5f-60c3652e2d90" id="sch.2-def.publicroad-note-para1-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">a pedestrian or bicycle path</txt></block></li></list></block></note></definition><definition affected.by.uncommenced="0" guid="_e2a19c4f-0689-4795-b6b4-371e51eea29d" id="sch.2-def.publicroadauthority_"><txt break.before="1"><defterm guid="_0b44b5ed-1baa-4d29-8b7b-288c96ce9b45" id="sch.2-def.publicroadauthority" type="definition">public road authority</defterm>, for a public road, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_eabf18ad-d4af-4444-b0d5-45a241325759" id="sch.2-def.publicroadauthority-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for a State-controlled road—the chief executive of the department in which the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-008" target.version.series="060a2469-1586-4719-b2aa-d22cc9ff8daf" type="act"><name emphasis="yes">Transport Infrastructure Act 1994</name></legref> is administered; or</txt></block></li><li guid="_f4bc911a-3282-4367-bc48-7a38279834b9" id="sch.2-def.publicroadauthority-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for another public road—the local government having the control of the road.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_2fe7c566-1205-4d12-9457-6fd154a6375d" id="sch.2-def.publish_"><txt break.before="1"><defterm guid="_08a0ecb3-45b7-405a-9396-b46c8ebe05a4" id="sch.2-def.publish" type="definition">publish</defterm>, a notice, means to publish it in any of the following ways—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_68f70b7d-1a87-4bbf-8025-39cbbf9306bc" id="sch.2-def.publish-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in a journal published by the department or under the Minister’s authority;</txt></block></li><li guid="_2386eb50-a80c-46c6-b03d-0e1cf57b5430" id="sch.2-def.publish-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">in another publication considered appropriate by—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1ea36cd1-36a1-4029-a1f9-ccdf4d79cf59" id="sch.2-def.publish-para1.b-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">generally—the Minister; or</txt></block></li><li guid="_16db97c7-f10b-4ffd-8ac9-6303b894a9b0" id="sch.2-def.publish-para1.b-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the subject of the notice relates to safety—the chief inspector;</txt></block></li></list></block></li><li guid="_6f9f171e-7079-4129-b12b-f9c4ac57006c" id="sch.2-def.publish-para1.c" provision.type="other"><no>(c)</no><block><txt break.before="0">on the department’s web site on the internet;</txt></block></li><li guid="_41bf4609-df7d-432d-a67d-cac18424e37c" id="sch.2-def.publish-para1.d" provision.type="other"><no>(d)</no><block><txt break.before="0">by placing it on a public notice board, established and maintained by the department, at—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ba32cf06-91f3-4839-9bc0-dd8a4465cac7" id="sch.2-def.publish-para1.d-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the department’s head office; and</txt></block></li><li guid="_11e13f1b-e18c-497c-8a64-67a82c8e4a59" id="sch.2-def.publish-para1.d-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">other places the chief executive considers appropriate.</txt></block></li></list></block></li></list></definition><definition affected.by.uncommenced="0" guid="_225d0499-2781-4eb7-8e29-51686a2c95fb" id="sch.2-def.QCATinformationnotice_"><txt break.before="1"><defterm guid="_05af33a1-b453-4add-bfb4-dbf5b97526df" id="sch.2-def.QCATinformationnotice" type="definition">QCAT information notice</defterm> means a notice complying with the <legref check="valid" jurisd="QLD" target.doc.id="act-2009-023" target.version.series="c51aec25-167d-4389-82a2-012d28089e17" type="act"><name emphasis="no">QCAT Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.157" target.doc.id="act-2009-023" target.guid="_91254813-a24a-46a1-8a51-ca252fb5f65a" target.version.series="c51aec25-167d-4389-82a2-012d28089e17" type="act">section 157</legref><legref check="invalid" jurisd="QLD" type="act">(2)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_35e66e5f-6d6d-415b-b2d3-183919b5b39b" id="sch.2-def.reasonablybelieves_"><txt break.before="1"><defterm guid="_607f51bc-092f-4ed7-a471-e02ad81755b8" id="sch.2-def.reasonablybelieves" type="definition">reasonably believes</defterm> means to believe on grounds that are reasonable in the circumstances.</txt></definition><definition affected.by.uncommenced="0" guid="_daf7d068-20e8-42a6-a94f-55de1b63d79e" id="sch.2-def.reasonablysuspects_"><txt break.before="1"><defterm guid="_081fe527-3bed-4a82-9aa6-86a5e22edb2f" id="sch.2-def.reasonablysuspects" type="definition">reasonably suspects</defterm> means to suspect on grounds that are reasonable in the circumstances.</txt></definition><definition affected.by.uncommenced="0" guid="_85e8c945-36ee-4138-8cdc-5d15311b38bb" id="sch.2-def.reassessment_"><txt break.before="1"><defterm guid="_8f5c40de-855f-4e56-b4a4-296ab1e0fe18" id="sch.2-def.reassessment" type="definition">reassessment</defterm>, for <intref check="valid" refid="ch.6" target.guid="_1179c65a-355e-4281-a616-c3e83927d1e4">chapter 6</intref>, see <intref check="valid" refid="sec.592A" target.guid="_bb630892-e7a1-4893-9908-dad90c5a0f49">section 592A</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_0ceb2bf1-87ec-406c-94bf-0c25755c8cab" id="sch.2-def.recipient_"><txt break.before="1"><defterm guid="_4c66316c-830c-4bec-9bf0-a949bd7c4792" id="sch.2-def.recipient" type="definition">recipient</defterm>, for <intref check="valid" refid="ch.3" target.guid="_7d989cb7-da2a-4737-842c-bd1944dbb54e">chapter 3</intref>, <intref check="valid" refid="ch.3-pt.8" target.guid="_7848573e-9ea5-49cb-a174-595b65c98b82">part 8</intref>, see <intref check="valid" refid="sec.390" target.guid="_d7d3f8fb-d730-449f-8a76-12a035de0bb0">section 390</intref><intref check="valid" refid="sec.390-ssec.1" target.guid="_dd085322-6e94-4a62-87e4-1efb92c26d93">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_5264ec7d-23f1-47a4-ab4b-7826d29c4bdd" id="sch.2-def.register_"><txt break.before="1"><defterm guid="_c79f2947-ef6d-4bc2-93b1-b2bda5eb6b78" id="sch.2-def.register" type="definition">register</defterm> means the register kept by the chief executive under the <legref check="valid" jurisd="QLD" target.doc.id="act-2014-047" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act"><name emphasis="no">Common Provisions Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.197" target.doc.id="act-2014-047" target.guid="_48018fef-a45f-4bbc-886c-d4b92b0494f8" target.version.series="4e5b43b7-4bcf-4cb4-8a50-fae5e166c1f2" type="act">section 197</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_90fcb644-df9c-426b-9ec3-d53419d0a71f" id="sch.2-def.relevantarrangement_"><txt break.before="1"><defterm guid="_18595306-0af1-4ecf-849d-5d297743c859" id="sch.2-def.relevantarrangement" type="definition">relevant arrangement</defterm>, for <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.2" target.guid="_f0429453-3af6-43cd-a6dd-cfc8b78be0a9">part 2</intref>, see <intref check="valid" refid="sec.121" target.guid="_7ba300a7-78fd-4831-8fe2-a3dc6ea79cf0">section 121</intref><intref check="valid" refid="sec.121-ssec.2" target.guid="_389d0935-b466-43dd-a2a8-7c97fc8edd04">(2)</intref><intref check="valid" refid="sec.121-ssec.2-para1.b" target.guid="_65562ba1-f712-45fe-adfe-9c74a87f9152">(b)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_4c16babd-6f2d-440e-8c40-c037cf2d7893" id="sch.2-def.relevantenvironmentalauthority_"><txt break.before="1"><defterm guid="_c52e8675-8822-431d-b4ea-9fa5e245f043" id="sch.2-def.relevantenvironmentalauthority" type="definition">relevant environmental authority</defterm>, for a petroleum authority, means an environmental authority under the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act"><name emphasis="no">Environmental Protection Act</name></legref> granted for all of the authorised activities for the petroleum authority that are environmentally relevant activities under the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261" type="act"><name emphasis="no">Environmental Protection Act</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_08460123-a0e1-4863-a13c-1678e0014d39" id="sch.2-def.relevantenvironmentalcondition_"><txt break.before="1"><defterm guid="_08bf1b30-63c8-4eb6-b879-bebbe224e46f" id="sch.2-def.relevantenvironmentalcondition" type="definition">relevant environmental condition</defterm>, for a petroleum authority, means a condition of any relevant environmental authority for the petroleum authority.</txt></definition><definition affected.by.uncommenced="0" guid="_3fb9db84-4052-49bb-a8e1-051f6f2141e7" id="sch.2-def.relevantland_"><txt break.before="1"><defterm guid="_df559ee5-b5eb-4897-ae97-64d0185f7f7d" id="sch.2-def.relevantland" type="definition">relevant land</defterm>, for a petroleum lease application, means the land the subject of the application.</txt></definition><definition affected.by.uncommenced="0" guid="_a6c0732a-1e0d-45ae-b67e-81e243e0107d" id="sch.2-def.relevantlease_"><txt break.before="1"><defterm guid="_cd0c5845-8393-4ace-8e14-0657926aa95a" id="sch.2-def.relevantlease" type="definition">relevant lease</defterm>, for a coordination arrangement or proposed coordination arrangement, see <intref check="valid" refid="sec.234" target.guid="_833f730f-e87f-4f59-9210-6dce92c940d2">section 234</intref><intref check="valid" refid="sec.234-ssec.1" target.guid="_cb5ae2df-d0dc-40ca-b283-59ffa796127b">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_0295e808-fb01-4efa-b66b-b63ca921fd02" id="sch.2-def.relevantofficial_"><txt break.before="1"><defterm guid="_dc6e890e-967a-446c-8506-07fe3b76b45d" id="sch.2-def.relevantofficial" type="definition">relevant official</defterm>, for noncompliance action, see <intref check="valid" refid="sec.789" target.guid="_2fe50a1d-bf5d-491a-9f1f-faadeda6c229">section 789</intref><intref check="valid" refid="sec.789-ssec.2" target.guid="_b8e13cd9-320f-4a4e-9e6b-54567b5fdd08">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_87704530-0b1a-4049-96dd-5852194d857d" id="sch.2-def.relevantowneroroccupier_"><txt break.before="1"><defterm guid="_28d74f14-923c-4024-a702-9f1ba2b3e075" id="sch.2-def.relevantowneroroccupier" type="definition">relevant owner or occupier</defterm>, for a provision about entry notices, means the owner or occupier to whom the entry notice is to be given, or would be given, other than for an exemption from the requirement to give an entry notice.</txt></definition><definition affected.by.uncommenced="0" guid="_2a081a64-ba72-4add-806b-97f95ed4fd35" id="sch.2-def.relevanttenureorauthority_"><txt break.before="1"><defterm guid="_02e768bb-4db3-486e-b86f-cbee4f5b9991" id="sch.2-def.relevanttenureorauthority" type="definition">relevant tenure or authority</defterm>, for <intref check="valid" refid="ch.10" target.guid="_c24d1b74-938d-44f7-b0f2-d23cd9205275">chapter 10</intref>, <intref check="valid" refid="ch.10-pt.3" target.guid="_ab9c9b86-73cb-4fe7-8c14-ab67d64b2ca8">part 3</intref>, see <intref check="valid" refid="sec.799B" target.guid="_64f3af6d-5b3f-4fb5-99d5-00bc8c6a6867">section 799B</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_ebc9de89-a0ba-4d8e-9ae5-f7896fca7f56" id="sch.2-def.relinquishmentcondition_"><txt break.before="1"><defterm guid="_68dceb31-0174-412e-9a3f-a74ed2464cf4" id="sch.2-def.relinquishmentcondition" type="definition">relinquishment condition</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_08054787-b4b7-413a-b740-98e97e7c620c" id="sch.2-def.relinquishmentcondition-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">Generally, the <defterm guid="_371a2bbb-a5ee-4fe5-9e4b-ca7e2eb62143" type="mention">relinquishment condition</defterm>, for an authority to prospect is the <defterm guid="_6642e5f1-eabc-4224-bf4a-3a04553d51f3" type="mention">relinquishment condition</defterm> under <intref check="valid" refid="sec.65" target.guid="_6aba535d-af2e-4d49-928f-d7162f827d0b">section 65</intref><intref check="valid" refid="sec.65-ssec.1" target.guid="_64068650-a039-4495-af25-c500dfb9692c">(1)</intref>.</txt></block></li><li guid="_86146a71-e5d1-4188-9781-7c49f486e22a" id="sch.2-def.relinquishmentcondition-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">However if <intref check="valid" refid="ch.15" target.guid="_5715b228-7bee-4f64-9a68-deae34090b8e">chapter 15</intref>, <intref check="valid" refid="ch.15-pt.3" target.guid="_7b6cfafe-1fa1-46dc-b544-e3327a0c144e">part 3</intref>, <intref check="valid" refid="ch.15-pt.3-div.2" target.guid="_7b0c82b3-81b5-4378-9ddf-a0577f55b3ba">division 2</intref> applies, and the authority is an authority to which <intref check="valid" refid="sec.878" target.guid="_6d147341-6f34-4435-b3da-b73e519e5541">section 878</intref> or <intref check="valid" refid="sec.879" target.guid="_4df7310e-4ece-4eaf-a43f-8106d8cd2249">879</intref> applies, the <defterm guid="_6ec8479e-85f4-41aa-9c8d-fb3c225c0a6e" type="mention">relinquishment condition</defterm> for the authority is the <defterm guid="_51f8f381-77df-4261-85ab-9c1df4eb61e3" type="mention">relinquishment condition</defterm> under that section.</txt></block></li><li guid="_d5ce3fac-105b-41e7-a4f7-7a4262260437" id="sch.2-def.relinquishmentcondition-para1.3" provision.type="other"><no>3</no><block><txt break.before="0">The <defterm guid="_3ccdca62-0e6d-4f82-8289-fa5562742955" type="mention">relinquishment condition</defterm> for a lease is the <defterm guid="_da812f9f-bfd9-4ea4-b222-6224c2dcc993" type="mention">relinquishment condition</defterm> under <intref check="valid" refid="sec.329" target.guid="_1c4755b7-4674-4bc3-88cc-c8f72ed6be02">section 329</intref><intref check="valid" refid="sec.329-ssec.2" target.guid="_50b65134-8101-43d5-9dc1-c423c1f361da">(2)</intref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" change="ins" guid="_61198a03-33bf-4e98-808e-4d513efb4e43" id="sch.2-def.relinquishmentday_"><txt break.before="1"><defterm guid="_cf464e38-3084-42bf-928b-51708b446bb8" id="sch.2-def.relinquishmentday" type="definition">relinquishment day</defterm>, for an authority to prospect, see section 64A.</txt></definition><definition affected.by.uncommenced="0" guid="_e0879a6d-e3fc-475e-8e08-60e900c9532c" id="sch.2-def.relinquishmentrequirements_"><txt break.before="1"><defterm guid="_53d224f9-6ba4-4d7f-a2f7-32bdcc70b663" id="sch.2-def.relinquishmentrequirements" type="definition">relinquishment requirements</defterm>, for an authority to prospect, means the requirements, including the relinquishment condition, applying under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.1" target.guid="_ae224c28-0e3b-4475-a663-d926bb3b8358">part 1</intref>, <intref check="valid" refid="ch.2-pt.1-div.4" target.guid="_a7b10fdd-8c1d-453c-9aa7-5f9db0272529">division 4</intref>, <intref check="valid" refid="ch.2-pt.1-div.4-sdiv.2" target.guid="_7ee6e428-3bad-4592-8f2c-1707222bc205">subdivision 2</intref> about how much, and when, any part of the area of the authority to prospect must be relinquished.</txt></definition><definition affected.by.uncommenced="0" guid="_6d932ad8-975e-4b7d-b657-4c97739c439c" id="sch.2-def.remedialpowers_"><txt break.before="1"><defterm guid="_259570fe-7b8f-49d1-8579-19804bf67858" id="sch.2-def.remedialpowers" type="definition">remedial powers</defterm> see <intref check="valid" refid="sec.580" target.guid="_818e9c24-4087-4d50-9017-6d57154a9a5c">section 580</intref><intref check="valid" refid="sec.580-ssec.2" target.guid="_2e5f25c3-3998-4266-8168-b90ad781278b">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" change="del" guid="_3fa8f029-cbb5-44b7-9aee-351946465873-del" id="sch.2-def.remediationactivities_-del"><txt break.before="1"><defterm guid="_78f04537-13a0-4357-9b0b-bc8b90544b55-del" id="sch.2-def.remediationactivities-del" type="definition">remediation activities</defterm>, for <intref check="valid" refid="ch.10" target.guid="_c24d1b74-938d-44f7-b0f2-d23cd9205275">chapter 10</intref>, <intref check="valid" refid="ch.10-pt.3" target.guid="_ab9c9b86-73cb-4fe7-8c14-ab67d64b2ca8">part 3</intref>, see <intref check="valid" refid="sec.799D" target.guid="_d692a50b-3f8c-407f-ad39-8861d356f2f1">section 799D</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_42199520-76b6-4b8a-914b-571d6dc6e62c" id="sch.2-def.remediationactivity_"><txt break.before="1"><defterm guid="_31bd8ffc-2af7-450d-91ed-b24784193e21" id="sch.2-def.remediationactivity" type="definition">remediation activity</defterm>, for <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.10" target.guid="_6f7f9284-5836-4486-b63b-35e219633886">part 10</intref>, <intref check="valid" refid="ch.2-pt.10-div.5" target.guid="_703512d1-9e03-4c9d-bd52-82121caabcf5">division 5</intref>, see <intref check="valid" refid="sec.294A" target.guid="_71f74295-f4f8-460f-8ded-c197be9135f3">section 294A</intref>.</txt></definition><definition affected.by.uncommenced="0" change="ins" guid="_8f63da21-c7a7-4995-8efc-120cb1edfe43" id="sch.2-def.remediationactivity_-oc.2"><txt break.before="1"><defterm guid="_37785906-773a-4671-b748-741768fc2091" id="sch.2-def.remediationactivity-def.remediationactivity" type="definition">remediation activity</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_5b53ca5e-90b0-4612-8dd1-2d5657d707cd" id="sch.2-def.remediationactivity-oc.2-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">for chapter 2, part 10, division 5—see section 294B; or</txt></block></li><li guid="_3514a86a-3053-4b78-a655-157ca056a448" id="sch.2-def.remediationactivity-oc.2-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">for chapter 10, part 3—see section 799CA.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_b7e8b109-ad3a-4eaf-a332-5fda0680baeb" id="sch.2-def.replacementtenure_"><txt break.before="1"><defterm guid="_6bebed8f-abdb-46fb-8237-3965d7dc9cc0" id="sch.2-def.replacementtenure" type="definition">replacement tenure</defterm> see <intref check="valid" refid="sec.908" target.guid="_7c949fad-03a7-42ef-a1f9-153725110b38">section 908</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_84cfa57c-bdf3-495f-af8a-600f3a2f0dc7" id="sch.2-def.report_"><txt break.before="1"><defterm guid="_fce7ab17-b565-49e6-aa37-59dc6bd6e884" id="sch.2-def.report" type="definition">report</defterm> means a written report.</txt></definition><definition affected.by.uncommenced="0" guid="_6231e6fd-7ba5-474a-95c7-b1a4df608e26" id="sch.2-def.reprisal_"><txt break.before="1"><defterm guid="_70578fbe-46b1-4ca9-afd3-39f8100b1e51" id="sch.2-def.reprisal" type="definition">reprisal</defterm> see <intref check="valid" refid="sec.708C" target.guid="_00c68ca9-d8d1-4cf3-a91f-5898c8349a43">section 708C</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_81ef0f0f-3d1e-48e7-8cbf-50b681eb8496" id="sch.2-def.requiredinformation_"><txt break.before="1"><defterm guid="_1f6b4f2f-68d7-4217-8aec-d6d83361e555" id="sch.2-def.requiredinformation" type="definition">required information</defterm>, for <intref check="valid" refid="ch.5" target.guid="_70cba8e1-1302-4ca3-a7ac-e87f8d5ebe7d">chapter 5</intref>, <intref check="valid" refid="ch.5-pt.7" target.guid="_01d524f3-ca84-4e41-ab48-d8ec12875570">part 7</intref>, <intref check="valid" refid="ch.5-pt.7-div.1" target.guid="_96471a0c-a566-4566-a6c0-6421f0c50c37">division 1</intref>, <intref check="valid" refid="ch.5-pt.7-div.1-sdiv.3" target.guid="_95d98756-fd18-4115-a580-f41e7b004e07">subdivision 3</intref>, see <intref check="valid" refid="sec.549" target.guid="_dbcbd9cf-f788-4a2b-98a6-b4213739ef3b">section 549</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_0bef06e5-e60c-4498-9246-70ddccedaa70" id="sch.2-def.requirementsforgrant_"><txt break.before="1"><defterm guid="_d914e50a-764b-4a26-9675-2d646ee23531" id="sch.2-def.requirementsforgrant" type="definition">requirements for grant</defterm> see <intref check="valid" refid="sec.120" target.guid="_ca27be89-b993-4627-be10-da97814de1d8">section 120</intref><intref check="valid" refid="sec.120-ssec.1" target.guid="_86ebe69e-3a38-4d1c-afcb-84e4fd1c3a2f">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_f68e0374-d07a-47ed-9d8b-c5a6ff50e669" id="sch.2-def.resourcemanagementdecision_"><txt break.before="1"><defterm guid="_eaf9cde8-32c0-4c70-8ddb-b7f82220d2bf" id="sch.2-def.resourcemanagementdecision" type="definition">resource management decision</defterm> see <intref check="valid" refid="sec.392AK" target.guid="_708fc819-6730-4a75-ac9d-159e406a7f8c">section 392AK</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_5d0c471d-0e3f-4c65-bf6e-f2494962a278" id="sch.2-def.resumptionlaw_"><txt break.before="1"><defterm guid="_947c0cd9-7ba2-4949-b5c7-fab93df0965b" id="sch.2-def.resumptionlaw" type="definition">resumption law</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_edc7aff7-2a68-4636-96e3-0d8c4d5bf692" id="sch.2-def.resumptionlaw-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">means a law that provides for the compulsory acquisition of land, including, for example, the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_da44e820-3596-49d7-80a2-05f021cbb2ab" id="sch.2-def.resumptionlaw-para1.a-para2.i" provision.type="other"><no>(i)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="no">ALA</name></legref>, including as applied by another law providing for an entity to take land under the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="no">ALA</name></legref> as if the entity were a constructing authority under the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="no">ALA</name></legref>;</txt><note guid="_5e033561-db48-4c48-b99a-5708e2dd21c1" id="sch.2-def.resumptionlaw-para1.a-para2.i-note" type="example"><heading guid="_0dc4036d-7596-4c9b-9197-de8b0720e85a" id="sch.2-def.resumptionlaw-para1.a-para2.i-note-he">Examples of other laws for <intref check="valid" refid="sch.2-def.resumptionlaw-para1.a-para2.i" target.guid="_da44e820-3596-49d7-80a2-05f021cbb2ab">subparagraph (i)</intref>—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_c4c05a97-5728-49f3-a336-49b07a65662f" id="sch.2-def.resumptionlaw-para1.a-para2.i-note-para3" provision.type="other"><no>•</no><block><txt break.before="0"><legref check="valid" jurisd="QLD" target.doc.id="act-1994-064" target.version.series="9906752b-4e97-4fa7-8f1e-9e2cbb7fb2b6" type="act"><name emphasis="yes">Electricity Act 1994</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.116" target.doc.id="act-1994-064" target.guid="_f87d3ceb-a856-421d-8616-2fcaed35164e" target.version.series="9906752b-4e97-4fa7-8f1e-9e2cbb7fb2b6" type="act">section 116</legref></txt></block></li><li guid="_36ded694-2b5c-4db7-a551-f555c0ad1d68" id="sch.2-def.resumptionlaw-para1.a-para2.i-note-para3-oc.2" provision.type="other"><no>•</no><block><txt break.before="0"><legref check="valid" jurisd="QLD" target.doc.id="act-2009-046" target.version.series="823a0dc3-6c45-4400-a230-133cee0bae67" type="act"><name emphasis="yes">South-East Queensland Water (Distribution and Retail Restructuring) Act 2009</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.53AY" target.doc.id="act-2009-046" target.guid="_00611709-da73-470f-9c11-1c5a9de1918e" target.version.series="823a0dc3-6c45-4400-a230-133cee0bae67" type="act">section 53AY</legref></txt></block></li></list></block></note></block></li><li guid="_0a7b2523-2e70-42c2-a3fe-acd9f258095c" id="sch.2-def.resumptionlaw-para1.a-para2.ii" provision.type="other"><no>(ii)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-081" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act"><name emphasis="yes">Land Act 1994</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.5" target.doc.id="act-1994-081" target.guid="_91196ad1-e6f1-4227-88be-219664507532" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act">chapter 5</legref>, <legref check="valid" jurisd="QLD" refid="ch.5-pt.3" target.doc.id="act-1994-081" target.guid="_bee95e24-5682-4f10-a530-b9f90f6f7bba" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act">part 3</legref>, <legref check="valid" jurisd="QLD" refid="ch.5-pt.3" target.doc.id="act-1994-081" target.guid="_bee95e24-5682-4f10-a530-b9f90f6f7bba" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act">division 3</legref>;</txt></block></li><li guid="_03f9667f-e5f1-4090-95a8-8e07f420e678" id="sch.2-def.resumptionlaw-para1.a-para2.iii" provision.type="other"><no>(iii)</no><block><txt break.before="0"><intref check="valid" refid="sec.456" target.guid="_a2ae2083-a7ba-4d2b-a95d-2db6e65409cb">sections 456</intref> to <intref check="valid" refid="sec.458" target.guid="_125a6292-9e16-44c0-815c-1762cb26e09e">458</intref> of this Act;</txt></block></li><li guid="_793a1a59-9f2e-4c59-abc1-45a6ac2e20a3" id="sch.2-def.resumptionlaw-para1.a-para2.iv" provision.type="other"><no>(iv)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-2011-001" target.version.series="d0479ffd-5564-4906-a81d-3fee31c8d91c" type="act"><name emphasis="yes">Queensland Reconstruction Authority Act 2011</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.99" target.doc.id="act-2011-001" target.guid="_3872469f-7f61-4a0c-b360-904044c401a8" target.version.series="d0479ffd-5564-4906-a81d-3fee31c8d91c" type="act">section 99</legref>;</txt></block></li><li guid="_12a0afbf-9862-4801-bfff-a9edad0b37d8" id="sch.2-def.resumptionlaw-para1.a-para2.v" provision.type="other"><no>(v)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1971-055" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" type="act"><name emphasis="no">State Development Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.82" target.doc.id="act-1971-055" target.guid="_6fb2ae53-0a2e-46bc-99d8-d6e9f1ad69a6" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" type="act">section 82</legref> or <legref check="valid" jurisd="QLD" refid="sec.125" target.doc.id="act-1971-055" target.guid="_a35d3756-3075-4f7f-8342-5db76023aece" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" type="act">125</legref>;</txt></block></li><li guid="_ba1e880d-9821-4bd2-b57b-b81368a7bdee" id="sch.2-def.resumptionlaw-para1.a-para2.vi" provision.type="other"><no>(vi)</no><block><txt break.before="0">the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-002" target.version.series="cf6c76a3-165d-4adb-aa9c-6eaa674ed46b" type="act"><name emphasis="yes">Transport Planning and Coordination Act 1994</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.25" target.doc.id="act-1994-002" target.guid="_cdbeb02a-d774-4504-8835-88b9bb1cfed9" target.version.series="cf6c76a3-165d-4adb-aa9c-6eaa674ed46b" type="act">section 25</legref> or <legref check="valid" jurisd="QLD" refid="sec.26" target.doc.id="act-1994-002" target.guid="_399400ab-dc67-455d-9430-644cb726de21" target.version.series="cf6c76a3-165d-4adb-aa9c-6eaa674ed46b" type="act">26</legref>; but</txt></block></li></list></block></li><li guid="_384f2721-8d68-4b1d-a494-eb7eb7b42215" id="sch.2-def.resumptionlaw-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">does not include the <legref check="valid" jurisd="QLD" target.doc.id="act-1994-081" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act"><name emphasis="yes">Land Act 1994</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.5" target.doc.id="act-1994-081" target.guid="_91196ad1-e6f1-4227-88be-219664507532" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act">chapter 5</legref>, <legref check="valid" jurisd="QLD" refid="ch.5-pt.3" target.doc.id="act-1994-081" target.guid="_bee95e24-5682-4f10-a530-b9f90f6f7bba" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act">part 3</legref>, <legref check="invalid" jurisd="QLD" type="act">divisions 1</legref> and <legref check="valid" jurisd="QLD" refid="ch.5-pt.3-div.2" target.doc.id="act-1994-081" target.guid="_3f183ee8-dc3e-4dd4-8a4c-27c5d206eb1b" target.version.series="65816ffc-330d-4ddd-87b5-e82241fc305f" type="act">2</legref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_d336f6db-d536-40bc-9ff0-6c32b563c61b" id="sch.2-def.resumptionnotice_"><txt break.before="1"><defterm guid="_882a044e-5e87-44da-9906-2a665c57d60a" id="sch.2-def.resumptionnotice" type="definition">resumption notice</defterm>, for the taking of land under a resumption law, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_9312e208-3f77-4c58-848c-b6aa17042274" id="sch.2-def.resumptionnotice-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">if the land is taken under the process stated in the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="no">ALA</name></legref> (whether the land is taken under the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="no">ALA</name></legref> or another resumption law)—the gazette resumption notice under the <legref check="valid" jurisd="QLD" target.doc.id="act-1967-048" target.version.series="732b1641-2e4f-46a1-8827-622fe0205043" type="act"><name emphasis="no">ALA</name></legref> for the taking; or</txt></block></li><li guid="_ada8b9f2-d197-4110-85bc-d7f9eb39dc5d" id="sch.2-def.resumptionnotice-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—the instrument giving effect to the taking.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_c8949495-628e-4cc4-875b-99bd68006c10" id="sch.2-def.reviewer_"><txt break.before="1"><defterm guid="_70a353d1-f5d0-48a4-bf64-c0e8e6426f9d" id="sch.2-def.reviewer" type="definition">reviewer</defterm> see <intref check="valid" refid="sec.817" target.guid="_3bb240da-66d2-46c4-a13a-500a798a8340">section 817</intref><intref check="valid" refid="sec.817-ssec.3" target.guid="_c83e0421-c27a-4e2a-803e-a6e01cf5149b">(3)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_f14c5c20-5779-4b35-84ae-f9905b0b3c88" id="sch.2-def.royaltyinformation_"><txt break.before="1"><defterm guid="_8657fdb2-38c6-4805-b6a9-787b9db61331" id="sch.2-def.royaltyinformation" type="definition">royalty information</defterm> see <intref check="valid" refid="sec.594" target.guid="_1788da15-7100-4095-b36c-68b5626f86eb">section 594</intref><intref check="valid" refid="sec.594-ssec.5" target.guid="_91cea939-2f9e-4ef4-b968-742c36625c21">(5)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_cad90ae8-98f7-49f1-ae77-d64ee428741d" id="sch.2-def.royaltyinvestigator_"><txt break.before="1"><defterm guid="_cbcfb779-c92d-4164-af63-614adc47dd1a" id="sch.2-def.royaltyinvestigator" type="definition">royalty investigator</defterm> means a person appointed as a royalty investigator under <intref check="valid" refid="sec.613" target.guid="_7720b861-d028-4379-b24b-effbd096c42a">section 613</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_0cda925f-0591-4947-84f3-c4451a40118b" id="sch.2-def.royaltypenaltyamount_"><txt break.before="1"><defterm guid="_0ab94c6f-d624-4496-8f66-bba1bd10b82c" id="sch.2-def.royaltypenaltyamount" type="definition">royalty penalty amount</defterm> see <intref check="valid" refid="sec.601" target.guid="_c6020f8e-d756-4c50-b19a-191a2f465545">section 601</intref><intref check="valid" refid="sec.601-ssec.1" target.guid="_09ad95d3-6977-4288-904c-49b1e5055b09">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_b0eb25ec-ea74-4364-80ca-40825079d888" id="sch.2-def.royaltyprovision_"><txt break.before="1"><defterm guid="_51efa5a6-4ec8-4be7-84c5-f4f82651377d" id="sch.2-def.royaltyprovision" type="definition">royalty provision</defterm> see <intref check="valid" refid="sec.612" target.guid="_93665396-7f2f-4f58-92b0-1b0c6a4c05f5">section 612</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_fcff86ce-915c-4e13-a851-72b83c891e13" id="sch.2-def.royaltyrelatedamount_"><txt break.before="1"><defterm guid="_5dcd908c-323d-4f49-a9de-3ef58e9589f4" id="sch.2-def.royaltyrelatedamount" type="definition">royalty-related amount</defterm>, for <intref check="valid" refid="ch.6" target.guid="_1179c65a-355e-4281-a616-c3e83927d1e4">chapter 6</intref>, see <intref check="valid" refid="sec.592A" target.guid="_bb630892-e7a1-4893-9908-dad90c5a0f49">section 592A</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_7e44ebf2-84eb-4dbd-8651-0ac66e23f18b" id="sch.2-def.royaltyreturn_"><txt break.before="1"><defterm guid="_8f23d2bf-36e3-4b29-9422-225e9d4d6d27" id="sch.2-def.royaltyreturn" type="definition">royalty return</defterm> see <intref check="valid" refid="sec.594" target.guid="_1788da15-7100-4095-b36c-68b5626f86eb">section 594</intref><intref check="valid" refid="sec.594-ssec.4" target.guid="_0584c628-8027-4d32-a772-02da5b7cd4cb">(4)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_d5b0e48d-0eef-4628-8fb4-5db8e5198083" id="sch.2-def.royaltyreturnperiod_"><txt break.before="1"><defterm guid="_5bcf2b9a-410c-4e0d-91c5-63beaaa0859b" id="sch.2-def.royaltyreturnperiod" type="definition">royalty return period</defterm> means the period, prescribed under a regulation, for which a royalty return must be lodged under <intref check="valid" refid="ch.6" target.guid="_1179c65a-355e-4281-a616-c3e83927d1e4">chapter 6</intref>, <intref check="valid" refid="ch.6-pt.2" target.guid="_839c1c31-4ce5-4f5d-8a94-80d4918aa832">part 2</intref>.</txt></definition><definition affected.by.uncommenced="0" change="ins" guid="_9d7b10e7-61f3-488f-84d0-2453a8b9a979" id="sch.2-def.RSHQ_"><txt break.before="1"><defterm guid="_46e5d5f6-d2ee-4d6f-bdd5-cc1369b1db15" id="sch.2-def.RSHQ" type="definition">RSHQ</defterm> means the statutory body called Resources Safety and Health Queensland established under the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="yes">Resources Safety and Health Queensland Act 2019</name></legref>, section 5.</txt></definition><definition affected.by.uncommenced="0" guid="_c05a0ae1-acff-41b8-99af-537acc409c81" id="sch.2-def.safetymanagementsystem_"><txt break.before="1"><defterm guid="_eaba4433-003d-434e-892e-2fbbbd230d87" id="sch.2-def.safetymanagementsystem" type="definition">safety management system</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_dd0cb8d7-e72b-41c1-afc6-a749aa8c45f0" id="sch.2-def.safetymanagementsystem-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">A safety management system, for an operating plant, is—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_e20d5252-a53b-4b5d-9c7b-0468da5b7637" id="sch.2-def.safetymanagementsystem-para1.1-para2.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the system made under <intref check="valid" refid="sec.674" target.guid="_52e15d93-fce0-4c51-847d-6082d601e7de">section 674</intref> as in force from time to time; and</txt><note guid="_b417ff87-5b88-47a5-a3bd-0f15725ab87e" id="sch.2-def.safetymanagementsystem-para1.1-para2.a-note" type="example"><heading guid="_99f66230-0259-4ee4-b69a-a0f69e3f1978" id="sch.2-def.safetymanagementsystem-para1.1-para2.a-note-he">Note—</heading><block><txt break.before="1">If <intref check="valid" refid="ch.9" target.guid="_e115e3d8-9707-4c5d-b3e6-be71f8d522ee">chapter 9</intref>, <intref check="valid" refid="ch.9-pt.4" target.guid="_feccc805-854d-490d-9644-dd7ef21961d9">part 4</intref>, <intref check="valid" refid="ch.9-pt.4-div.5" target.guid="_3ccd9143-f883-4790-8d0d-2f2006c5ce9b">division 5</intref>, <intref check="valid" refid="ch.9-pt.4-div.5-sdiv.1" target.guid="_871b13c6-0132-4ee8-8f83-05a6329f2dbf">subdivision 1</intref> applies for an operating plant, the safety management system under <intref check="valid" refid="sec.674" target.guid="_52e15d93-fce0-4c51-847d-6082d601e7de">section 674</intref> must include a joint interaction management plan.</txt></block></note></block></li><li guid="_11f87107-b954-4afc-b447-575b3ac94163" id="sch.2-def.safetymanagementsystem-para1.1-para2.b" provision.type="other"><no>(b)</no><block><txt break.before="0">an auditable documented system that forms part of an overall management system for the plant.</txt></block></li></list></block></li><li guid="_d461b5ff-c718-4c15-9f67-13b395fb4b84" id="sch.2-def.safetymanagementsystem-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">If the plant has stages, a reference to the term includes the parts of the safety management system developed for each stage.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_3382e92c-55ee-45dd-8fde-d1f3d28d74d0" id="sch.2-def.safetyrequirements_"><txt break.before="1"><defterm guid="_b3aede29-b9ad-473b-a5cb-e4dfc9811ca3" id="sch.2-def.safetyrequirements" type="definition">safety requirements</defterm> see <intref check="valid" refid="sec.669" target.guid="_6b7220f7-5c5d-49d9-8891-f3cd753d86b9">section 669</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_8365fc20-9abc-4935-a878-f64b9627e429" id="sch.2-def.satisfies_"><txt break.before="1"><defterm guid="_0603e63f-665c-44fa-a7a0-f2fb5ad13c3c" id="sch.2-def.satisfies" type="definition">satisfies</defterm>, the capability criteria, for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1953a89e-b156-422b-92f6-1ef7263e620f" id="sch.2-def.satisfies-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0"><intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.1" target.guid="_ae224c28-0e3b-4475-a663-d926bb3b8358">part 1</intref>—see <intref check="valid" refid="sec.43" target.guid="_2c0b3e46-8914-4834-bfdb-7d2ff2248ba2">section 43</intref><intref check="valid" refid="sec.43-ssec.3" target.guid="_3327eb7f-f09a-4f95-bb17-256fff05b3e9">(3)</intref>; or</txt></block></li><li guid="_85a35a91-4825-4213-a000-9e6917a4f628" id="sch.2-def.satisfies-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0"><intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.2" target.guid="_f0429453-3af6-43cd-a6dd-cfc8b78be0a9">part 2</intref>—see <intref check="valid" refid="sec.121" target.guid="_7ba300a7-78fd-4831-8fe2-a3dc6ea79cf0">section 121</intref><intref check="valid" refid="sec.121-ssec.4" target.guid="_81c3c3b3-7971-4083-ae07-6ef3c3b9ab20">(4)</intref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_674813e1-2100-4c0e-97d9-50381c0794b0" id="sch.2-def.security_"><txt break.before="1"><defterm guid="_ddbf8125-bbfe-47da-9fe3-2a65248ea747" id="sch.2-def.security" type="definition">security</defterm> includes bond, deposit of an amount as security, guarantee, indemnity or other surety, insurance, mortgage and undertaking.</txt></definition><definition affected.by.uncommenced="0" change="ins" guid="_ab60c985-d88a-49e2-9eb2-c4a07ec4046f" id="sch.2-def.seniorofficer_"><txt break.before="1"><defterm guid="_2848c693-8503-4feb-9117-fa7ed8ede7dd" id="sch.2-def.seniorofficer" type="definition">senior officer</defterm>, of an employer for an operating plant or gas work, for chapter 11, part 1AA, see section 799I(1).</txt></definition><definition affected.by.uncommenced="0" guid="_4ede8512-c725-41d1-9f1e-541647798dbe" id="sch.2-def.serviceprovider_"><txt break.before="1"><defterm guid="_2f56ebed-2380-4798-b04b-dbe840d48e00" id="sch.2-def.serviceprovider" type="definition">service provider</defterm>, for an affected party, see <intref check="valid" refid="sec.661" target.guid="_e5f641ba-b57a-450a-8057-6d999a79a344">section 661</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_9f1d2451-d9d4-44da-bc53-7110742ce41b" id="sch.2-def.serviceprovidertest_"><txt break.before="1"><defterm guid="_b3281701-708a-43c6-9848-8179c950ab4f" id="sch.2-def.serviceprovidertest" type="definition">service provider test</defterm>, for a meter, see <intref check="valid" refid="sec.662" target.guid="_8bc66cfb-bd07-48ae-9263-0ee2ff47b25d">section 662</intref><intref check="valid" refid="sec.662-ssec.1" target.guid="_264b8ffe-c59f-4b3c-bc3e-d5ce4bb5e2da">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_4cb22305-818a-4968-908e-531d840df22d" id="sch.2-def.servicesoftheState_"><txt break.before="1"><defterm guid="_1dce0391-1c5a-4c5c-b70d-366212eae450" id="sch.2-def.servicesoftheState" type="definition">services of the State</defterm> has the same meaning that the term has in relation to the State of Queensland under the <legref check="invalid" jurisd="CTH" type="act"><name emphasis="yes">Copyright Act 1968</name> (Cwlth)</legref>, <legref check="invalid" jurisd="CTH" refid="sec.183" type="act">section 183</legref><legref check="invalid" jurisd="CTH" refid="sec.183-ssec.1" type="act">(1)</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_e6ff098e-739a-4e58-8ea7-c13c73bbe4cc" id="sch.2-def.share_"><txt break.before="1"><defterm guid="_d9f84d52-d6f1-431e-89d2-3c4982c22297" id="sch.2-def.share" type="definition">share</defterm>, of a petroleum authority, means any interest held by a person as a holder of the authority in all of the area of the authority.</txt></definition><definition affected.by.uncommenced="0" guid="_8e25516c-f5f4-40aa-8fbe-6c1913008b2e" id="sch.2-def.sitesafetymanager_"><txt break.before="1"><defterm guid="_1b403717-6b29-47ac-b537-759b73436201" id="sch.2-def.sitesafetymanager" type="definition">site safety manager</defterm> means a site safety manager appointed under <intref check="valid" refid="sec.692" target.guid="_97044840-77d2-4acc-9c85-8ad4f4899e42">section 692</intref> or any operator mentioned in <intref check="valid" refid="sec.694" target.guid="_7f4ca860-a24d-4172-aca1-015c44bcda5c">section 694</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_a8591d86-1782-45c2-84b1-748d06a4b67a" id="sch.2-def.siteseniorexecutive_"><txt break.before="1"><defterm guid="_2ba8368f-6552-4465-a7c9-9d0fa7ddc1ff" id="sch.2-def.siteseniorexecutive" type="definition">site senior executive</defterm>, for <intref check="valid" refid="ch.9" target.guid="_e115e3d8-9707-4c5d-b3e6-be71f8d522ee">chapter 9</intref>, <intref check="valid" refid="ch.9-pt.4" target.guid="_feccc805-854d-490d-9644-dd7ef21961d9">part 4</intref>, <intref check="valid" refid="ch.9-pt.4-div.5" target.guid="_3ccd9143-f883-4790-8d0d-2f2006c5ce9b">division 5</intref>, <intref check="valid" refid="ch.9-pt.4-div.5-sdiv.1" target.guid="_871b13c6-0132-4ee8-8f83-05a6329f2dbf">subdivision 1</intref>, see <intref check="valid" refid="sec.705A" target.guid="_38abe539-5c16-4904-9b11-eaa2a6704baa">section 705A</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_1b55d7fc-8f72-4921-b09d-86ef5168f86e" id="sch.2-def.specialamendment_"><txt break.before="1"><defterm guid="_5f843aee-9fe5-4d6c-841f-c310a1fef46e" id="sch.2-def.specialamendment" type="definition">special amendment</defterm> see <intref check="valid" refid="sec.107A" target.guid="_3767afe6-928f-4448-8e44-92c8e43d5d9c">section 107A</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_581e52b1-277a-43f5-a12c-7a989fb20dd3" id="sch.2-def.specialcriteria_"><txt break.before="1"><defterm guid="_46c6e9c1-0c48-425d-98e9-161c16ef3aeb" id="sch.2-def.specialcriteria" type="definition">special criteria</defterm> for—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_d8466c6d-1fcf-4586-b96e-438e76f08a9a" id="sch.2-def.specialcriteria-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0"><intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.1" target.guid="_ae224c28-0e3b-4475-a663-d926bb3b8358">part 1</intref>—see <intref check="valid" refid="sec.35" target.guid="_87b53d9f-6f6c-49a9-ad51-118aa252ae58">section 35</intref><intref check="valid" refid="sec.35-ssec.2" target.guid="_120ae8b4-7377-489d-b475-e040e000f7e2">(2)</intref>(<del xml:space="preserve"><intref check="valid" refid="sec.35-ssec.2-para1.e" target.guid="_d6918c74-54bf-4835-9756-6a2f38027506">e)(iii)</intref></del><ins xml:space="preserve">h)(iii)</ins>; or</txt></block></li><li guid="_f5fd5022-a75b-43a9-89d7-5074cd9da424" id="sch.2-def.specialcriteria-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0"><intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.2" target.guid="_f0429453-3af6-43cd-a6dd-cfc8b78be0a9">part 2</intref>—see <intref check="valid" refid="sec.127" target.guid="_6a587d42-acca-4fdd-9d32-8061b1e8ce8d">section 127</intref><intref check="valid" refid="sec.127-ssec.2" target.guid="_b1792919-26fe-4492-b0ab-61b6de1e7090">(2)</intref><intref check="valid" refid="sec.127-ssec.2-para1.e" target.guid="_eb0aab4f-c520-4d64-937d-65590fbc94e7">(e)</intref><intref check="valid" refid="sec.127-ssec.2-para1.e-para2.iii" target.guid="_889c44ed-22cf-4231-ba8c-5ff25ff4b224">(iii)</intref>.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_df1a4e07-581f-4227-a19a-7c0980b198f2" id="sch.2-def.specificpurposemininglease_"><txt break.before="1"><defterm guid="_f2b6cbc7-0009-402a-b374-f18457f0dc09" id="sch.2-def.specificpurposemininglease" type="definition">specific purpose mining lease</defterm> means a mining lease that, under the <legref check="valid" jurisd="QLD" target.doc.id="act-1989-110" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act"><name emphasis="no">Mineral Resources Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sec.234" target.doc.id="act-1989-110" target.guid="_aacaab2a-f7ea-4796-b76f-11e137eb0e47" target.version.series="731a7ca0-1e25-47e4-89d8-24d4d17632dd" type="act">section 234</legref><legref check="invalid" jurisd="QLD" type="act">(1)</legref><legref check="invalid" jurisd="QLD" type="act">(b)</legref>, is granted for a purpose other than mining.</txt></definition><definition affected.by.uncommenced="0" guid="_f5a8530c-8d7c-4b80-a1d0-bcb16c018459" id="sch.2-def.stage_"><txt break.before="1"><defterm guid="_b47136da-7588-4112-a52a-a7c25f8cbafd" id="sch.2-def.stage" type="definition">stage</defterm>, of an operating plant, see <intref check="valid" refid="sec.672" target.guid="_cb887025-604f-4c49-8d75-5d45252e2165">section 672</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_34698de5-f76d-4e96-9be3-d717549d4fd1" id="sch.2-def.standardoperatingprocedures_"><txt break.before="1"><defterm guid="_468d9d21-1a5b-43c4-acae-f61d672db2d5" id="sch.2-def.standardoperatingprocedures" type="definition">standard operating procedures</defterm>, for an operating plant, is a documented way of working, or an arrangement of facilities, at the plant to achieve an acceptable level of risk.</txt></definition><definition affected.by.uncommenced="0" guid="_1ccede59-100a-4cf5-b1f8-87f0a2b7f3d6" id="sch.2-def.Statecontrolledroad_"><txt break.before="1"><defterm guid="_e2531170-6e38-4048-841a-312f05d46222" id="sch.2-def.Statecontrolledroad" type="definition">State-controlled road</defterm> see <legref check="valid" jurisd="QLD" target.doc.id="act-1994-008" target.version.series="060a2469-1586-4719-b2aa-d22cc9ff8daf" type="act"><name emphasis="yes">Transport Infrastructure Act 1994</name></legref>, <legref check="valid" jurisd="QLD" refid="sch.6" target.doc.id="act-1994-008" target.guid="_8f92dfc8-8640-4c01-8835-c09330c3ee8a" target.version.series="060a2469-1586-4719-b2aa-d22cc9ff8daf" type="act">schedule 6</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_091d314b-30b8-4ec9-9b9d-568e72042140" id="sch.2-def.StateDevelopmentAct_"><txt break.before="1"><defterm guid="_910bcd4a-cea5-43cd-8619-080d07ae88ff" id="sch.2-def.StateDevelopmentAct" type="definition">State Development Act</defterm> means the <legref check="valid" jurisd="QLD" target.doc.id="act-1971-055" target.version.series="b07e98ba-0547-4684-a0a8-a179ec3dbe59" type="act"><name emphasis="yes">State Development and Public Works Organisation Act 1971</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_8fb1e36a-06d4-4fca-be09-c6ded75d65cf" id="sch.2-def.statedpipelinelicenceincidentalactivity_"><txt break.before="1"><defterm guid="_384b1126-1f9b-423a-94bb-8a33b6ffa079" id="sch.2-def.statedpipelinelicenceincidentalactivity" type="definition">stated pipeline licence incidental activity</defterm> see <intref check="valid" refid="sec.403" target.guid="_31221de2-cdfc-4596-80c1-d25e92caaa7a">section 403</intref><intref check="valid" refid="sec.403-ssec.3" target.guid="_648ad43c-2170-458d-b22d-e6561c10117b">(3)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_77f7b9ac-29f2-44bc-8d54-38db0266702c" id="sch.2-def.stockpurposes_"><txt break.before="1"><defterm guid="_30f65b51-f235-4443-8499-3f13154aae54" id="sch.2-def.stockpurposes" type="definition">stock purposes</defterm> means watering stock of a number that would normally be depastured on the land on which the water is, or is to be, used.</txt></definition><definition affected.by.uncommenced="0" guid="_eecc2c30-e351-4141-8f6f-66c50b414ac2" id="sch.2-def.storageagreement_"><txt break.before="1"><defterm guid="_f81453db-9ccd-48a5-a14a-378c87bbae22" id="sch.2-def.storageagreement" type="definition">storage agreement</defterm> see <intref check="valid" refid="sec.205" target.guid="_1dd78fc2-6141-470d-82bd-df983ee8748d">section 205</intref><intref check="valid" refid="sec.205-ssec.1" target.guid="_dc28d74f-ce8c-416b-9578-91f426a71301">(1)</intref> and <intref check="valid" refid="sec.205-ssec.5" target.guid="_524ed9d4-d1e7-4d09-abee-7403b9ef3595">(5)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_f88ba37b-dbf3-4d50-ad84-a11403235e9d" id="sch.2-def.storagecapacity_"><txt break.before="1"><defterm guid="_4e8b406b-336a-4b2e-ba57-b3448f1e0ef3" id="sch.2-def.storagecapacity" type="definition">storage capacity</defterm>, of a natural underground reservoir, means the measure of its potential to store petroleum or a prescribed storage gas.</txt></definition><definition affected.by.uncommenced="0" guid="_656a3418-25af-410f-88dc-ec890a2f9fdf" id="sch.2-def.structure_"><txt break.before="1"><defterm guid="_14b25d9f-e988-4400-8ae9-3b2e39555e52" id="sch.2-def.structure" type="definition">structure</defterm> means anything built or constructed, whether or not attached to land.</txt></definition><definition affected.by.uncommenced="0" guid="_db50b959-edc7-4d11-af72-8466f1fda71b" id="sch.2-def.subblock_"><txt break.before="1"><defterm guid="_8cc3b233-ccae-4742-b055-36c05e6a8554" id="sch.2-def.subblock" type="definition">sub-block</defterm> see <intref check="valid" refid="sec.29" target.guid="_d20e002f-c415-4051-bfa8-5447f61eb769">section 29</intref><intref check="valid" refid="sec.29-ssec.2" target.guid="_d4348378-c3fd-4277-a90f-b864c1aeb1cb">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_84840649-5f2e-40a4-9930-25fc52b017a3" id="sch.2-def.submission_"><txt break.before="1"><defterm guid="_f24f91cd-05db-49b3-bd23-bbc62693dc1e" id="sch.2-def.submission" type="definition">submission</defterm> means a written submission.</txt></definition><definition affected.by.uncommenced="0" guid="_128e2b7c-b672-4b19-847c-9b477a83d8ec" id="sch.2-def.submissionperiod_"><txt break.before="1"><defterm guid="_0c5b80b0-3459-4620-8db6-5861ab4327bf" id="sch.2-def.submissionperiod" type="definition">submission period</defterm>, for <intref check="valid" refid="ch.3" target.guid="_7d989cb7-da2a-4737-842c-bd1944dbb54e">chapter 3</intref>, <intref check="valid" refid="ch.3-pt.2" target.guid="_60586bec-2198-4a1a-9860-a488c272707c">part 2</intref>, see <intref check="valid" refid="sec.314" target.guid="_59e51d7e-3865-4a05-9438-464af9977aa7">section 314</intref><intref check="valid" refid="sec.314-ssec.2" target.guid="_76afe465-1dd6-49a1-b9b0-e097c1a77f25">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_77195280-04e2-4cae-8925-ecde76e27f43" id="sch.2-def.supply_"><txt break.before="1"><defterm guid="_0a34326c-2cd2-4e69-9d7c-3e31b43c1d5c" id="sch.2-def.supply" type="definition">supply</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_ff9a493e-34f2-4f82-a205-73610bc9d06f" id="sch.2-def.supply-para1.1" provision.type="other"><no>1</no><block><txt break.before="0"><defterm guid="_f0a69fa3-c711-403e-a86a-0a297decde5d" type="mention">Supply</defterm> means to supply by way of business.</txt></block></li><li guid="_a1d3837e-76f2-46bf-aa48-9a282213813e" id="sch.2-def.supply-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">The term includes each of the following—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_7d731b2c-d3ab-4801-a687-c855d81bb43a" id="sch.2-def.supply-para1.2-para2.a" provision.type="other"><no>(a)</no><block><txt break.before="0">give or sell;</txt></block></li><li guid="_6c4311f8-4eb9-4be5-98e6-9aed0fccd0bf" id="sch.2-def.supply-para1.2-para2.b" provision.type="other"><no>(b)</no><block><txt break.before="0">agree, attempt or offer to give or sell;</txt></block></li><li guid="_961b74c8-e53c-4e83-9ef0-7c561348fd67" id="sch.2-def.supply-para1.2-para2.c" provision.type="other"><no>(c)</no><block><txt break.before="0">advertise to give or sell;</txt></block></li><li guid="_fc70eee0-6cbc-48a7-9ffb-f3838cde9620" id="sch.2-def.supply-para1.2-para2.d" provision.type="other"><no>(d)</no><block><txt break.before="0">cause or permit to be given or sold;</txt></block></li><li guid="_b482ced9-530b-4e21-9618-614e2ebfcfe7" id="sch.2-def.supply-para1.2-para2.e" provision.type="other"><no>(e)</no><block><txt break.before="0">give away or swap.</txt></block></li></list></block></li></list></definition><definition affected.by.uncommenced="0" guid="_d7c98a89-0925-417c-aea5-414591e6a3c0" id="sch.2-def.surveylicence_"><txt break.before="1"><defterm guid="_565613bd-c7e2-4c33-8b31-ae1739448740" id="sch.2-def.surveylicence" type="definition">survey licence</defterm> see <intref check="valid" refid="sec.18" target.guid="_00606342-13a2-49f5-a337-6c1f809e1f2e">section 18</intref><intref check="valid" refid="sec.18-ssec.1" target.guid="_b50a8cff-43ef-47e2-9531-603839cf5b0c">(1)</intref><intref check="valid" refid="sec.18-ssec.1-para1.e" target.guid="_1848eaca-8965-4f2e-b3b2-4159843598a1">(e)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_11136c16-4478-447d-b68d-658a525e9903" id="sch.2-def.take_"><txt break.before="1"><defterm guid="_78a00007-f803-4667-9ed5-19dbac4f4c54" id="sch.2-def.take" type="definition">take</defterm>, in relation to land, includes acquire.</txt></definition><definition affected.by.uncommenced="0" guid="_142556db-fb39-4ec8-9e1c-f7def5efcdbe" id="sch.2-def.takeovercondition_"><txt break.before="1"><defterm guid="_66dc27fb-c812-4c0a-b9fe-3f352c5c1325" id="sch.2-def.takeovercondition" type="definition">takeover condition</defterm> see <intref check="valid" refid="sec.413" target.guid="_da43b0ac-1bce-4941-9aa8-6e978b5b7b54">section 413</intref><intref check="valid" refid="sec.413-ssec.1" target.guid="_b715303e-998a-4131-bad9-1dfa07879f3d">(1)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_b9774861-d4d6-415a-9465-4973ee97fc76" id="sch.2-def.tank_"><txt break.before="1"><defterm guid="_6cc8bf94-230b-4f2c-99d0-b624209ee8db" id="sch.2-def.tank" type="definition">tank</defterm> means a pressure vessel to which AS 1210 ‘Pressure vessels’ (1997) applies.</txt></definition><definition affected.by.uncommenced="0" guid="_3c651654-2305-4df2-92bf-1f11a472943c" id="sch.2-def.tendersecurity_"><txt break.before="1"><defterm guid="_be8c3ff4-1fb9-4dbd-b838-63fa18f33e2e" id="sch.2-def.tendersecurity" type="definition">tender security</defterm>, for a tender under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.1" target.guid="_ae224c28-0e3b-4475-a663-d926bb3b8358">part 1</intref> or <intref check="valid" refid="ch.2-pt.2" target.guid="_f0429453-3af6-43cd-a6dd-cfc8b78be0a9">2</intref>, means an amount given by the relevant tenderer as security for the tender.</txt></definition><definition affected.by.uncommenced="0" guid="_6ac80e30-c553-4876-8963-0cf9d2aeed5a" id="sch.2-def.toleranceforerror_"><txt break.before="1"><defterm guid="_9f1bde93-2482-41c3-8582-5fd986dfdbc2" id="sch.2-def.toleranceforerror" type="definition">tolerance for error</defterm>, for a meter, see <intref check="valid" refid="sec.635" target.guid="_494a27eb-c711-4316-a20d-31803239c1d5">section 635</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_940cf6be-a899-40a8-94aa-9f1b9f867f5d" id="sch.2-def.transfer_"><txt break.before="1"><defterm guid="_c13e2bd6-27b9-4d9f-aa5a-d8f3c00e6747" id="sch.2-def.transfer" type="definition">transfer</defterm>, of a petroleum well, water injection bore, water observation bore or water supply bore, see <intref check="valid" refid="sec.285" target.guid="_546983c0-133b-467d-b31d-8892cc410a4c">section 285</intref><intref check="valid" refid="sec.285-ssec.2" target.guid="_46903392-b1fb-49ae-962e-c6256ce5fae3">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_2595f979-9565-4a51-a6ae-f2b1702cbbaa" id="sch.2-def.undergroundgasificationactivity_"><txt break.before="1"><defterm guid="_b48a07ae-68c3-48bc-9378-694bbfdd61b6" id="sch.2-def.undergroundgasificationactivity" type="definition">underground gasification activity</defterm> means an activity on a coal or oil shale mining tenement or a petroleum authority relating to—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_3a8d0ea8-4e4c-40cf-99a8-df3f9a30d3d6" id="sch.2-def.undergroundgasificationactivity-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the exploration for, and testing of, coal or oil shale to be used for the production of mineral (f); or</txt></block></li><li guid="_53b6c56c-8ff7-4d43-b092-fbc586d53925" id="sch.2-def.undergroundgasificationactivity-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">the production, processing, refining, storage or transportation of mineral (f).</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_0abe9666-285b-4c8e-b745-c2615e1cf840" id="sch.2-def.undergroundwater_"><txt break.before="1"><defterm guid="_b90c1508-43e3-400f-9546-4eb62491e736" id="sch.2-def.undergroundwater" type="definition">underground water</defterm> see the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref>, <legref check="valid" jurisd="QLD" refid="sch.4" target.doc.id="act-2000-034" target.guid="_b009b8e2-6bb9-4e14-9da8-16fb8237721f" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act">schedule 4</legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_f3bd6b8c-e97f-4efb-898c-922fd8717473" id="sch.2-def.undergroundwaterobligations_"><txt break.before="1"><defterm guid="_b3d6f104-e20b-4ca0-ac29-1be910953d1d" id="sch.2-def.undergroundwaterobligations" type="definition">underground water obligations</defterm>, of a petroleum tenure holder, means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_8b8f8069-7257-4e9c-952b-0984e1506cf3" id="sch.2-def.undergroundwaterobligations-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">the holder’s underground water obligations under the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-2000-034" target.guid="_925a85c9-88dd-4ce0-a3a5-2154f5bf8586" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act">chapter 3</legref>; and</txt></block></li><li guid="_46202706-652f-4944-b5d0-410a09e91376" id="sch.2-def.undergroundwaterobligations-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">any other obligation under the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-2000-034" target.guid="_925a85c9-88dd-4ce0-a3a5-2154f5bf8586" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act">chapter 3</legref> with which the holder is required to comply, if failure to comply with the obligation is an offence against that Act.</txt><note guid="_c107acf7-4426-48a7-856c-d269a755cea1" id="sch.2-def.undergroundwaterobligations-para1.b-note" type="example"><heading guid="_da94c830-073f-4ada-af28-4eafe9680a99" id="sch.2-def.undergroundwaterobligations-para1.b-note-he">Examples of another obligation under the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref>, <legref check="valid" jurisd="QLD" refid="ch.3" target.doc.id="act-2000-034" target.guid="_925a85c9-88dd-4ce0-a3a5-2154f5bf8586" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act">chapter 3</legref> with which the holder may be required to comply—</heading><block><list number.type="manual" unnumbered.indent="0"><li guid="_002cd8ee-5f30-4c34-8274-a4f980e0eaf9" id="sch.2-def.undergroundwaterobligations-para1.b-note-para2" provision.type="other"><no>•</no><block><txt break.before="0">giving an underground water impact report under <legref check="valid" jurisd="QLD" refid="sec.370" target.doc.id="act-2000-034" target.guid="_e4ac2fb8-d87a-4cfc-9ec5-573ffab443dd" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act">section 370</legref> of that Act</txt></block></li><li guid="_b78d0feb-3b2c-4ee9-9864-b661d24bccc5" id="sch.2-def.undergroundwaterobligations-para1.b-note-para2-oc.2" provision.type="other"><no>•</no><block><txt break.before="0">preparing and complying with a baseline assessment plan under <legref check="valid" jurisd="QLD" refid="sec.397" target.doc.id="act-2000-034" target.guid="_d3c46bdd-57eb-4041-8a4a-8cc00a80531d" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act">sections 397</legref> and <legref check="valid" jurisd="QLD" refid="sec.400" target.doc.id="act-2000-034" target.guid="_bcfc1886-bed8-4c83-bf5b-9309d7c460f8" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act">400</legref> of that Act</txt></block></li></list></block></note></block></li></list></definition><definition affected.by.uncommenced="0" guid="_f86fff8c-9ffc-4926-8f48-1f375c8f7a3f" id="sch.2-def.undergroundwaterrights_"><txt break.before="1"><defterm guid="_e54f1588-6a44-437a-8332-38915403907d" id="sch.2-def.undergroundwaterrights" type="definition">underground water rights</defterm>, for a petroleum tenure, see <intref check="valid" refid="sec.185" target.guid="_5311db10-8c62-445d-82df-35eda5925626">section 185</intref><intref check="valid" refid="sec.185-ssec.2" target.guid="_228186ac-2a49-4adf-9fe7-aea5ea8fb237">(2)</intref><intref check="valid" refid="sec.185-ssec.2-para1.a" target.guid="_8c9992d6-a5ff-4a15-9d7c-c53e65128c0d">(a)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_10b5750e-9b3f-4751-8707-a383c9882571" id="sch.2-def.unpaidroyaltyinterest_"><txt break.before="1"><defterm guid="_338d839c-c5c1-4496-b20b-1393cb0f2a3f" id="sch.2-def.unpaidroyaltyinterest" type="definition">unpaid royalty interest</defterm> see <intref check="valid" refid="sec.602" target.guid="_781455cf-5b8d-43c2-964e-cd50ff93c329">section 602</intref><intref check="valid" refid="sec.602-ssec.2" target.guid="_c6c4c9de-6c45-49ff-8d03-1a377ac7dee1">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_4f323819-34fc-4bdc-814a-af366367eceb" id="sch.2-def.usualrelinquishment_"><txt break.before="1"><defterm guid="_14d67b84-e79e-445e-b42e-bcf30d9d1050" id="sch.2-def.usualrelinquishment" type="definition">usual relinquishment</defterm> see <intref check="valid" refid="sec.66" target.guid="_fd7ab3a4-d130-420e-a30c-56eef0914255">section 66</intref><intref check="valid" refid="sec.66-ssec.3" target.guid="_01aeb80e-2294-4a78-8428-b4045f6a5e09">(3)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_4f2b37f5-da54-4b75-95f3-ea33b8322e4b" id="sch.2-def.validationtest_"><txt break.before="1"><defterm guid="_2eda3a9a-8131-4237-a562-bf259b4b7cad" id="sch.2-def.validationtest" type="definition">validation test</defterm>, for a meter, see <intref check="valid" refid="sec.666" target.guid="_9476c490-540a-47ab-ac94-c0ca58d55b4c">section 666</intref><intref check="valid" refid="sec.666-ssec.2" target.guid="_03d4eb5c-15a3-4236-8c74-c054384c4cf2">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_63140ce4-abf0-4dd5-8b8c-6409e4bcc2f4" id="sch.2-def.WaterAct_"><txt break.before="1"><defterm guid="_ffdb3efe-5cbf-4be7-a89c-fc5cd7430e27" id="sch.2-def.WaterAct" type="definition">Water Act</defterm> means the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="yes">Water Act 2000</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_8ffed0af-ab21-4236-a99c-d3fd700a3b93" id="sch.2-def.WaterActregulator_"><txt break.before="1"><defterm guid="_c6858362-2990-4b5f-bab6-c35f9bd39535" id="sch.2-def.WaterActregulator" type="definition">Water Act regulator</defterm> means the chief executive of the department that administers the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_21bdc548-f0a9-4820-adc5-ea7436ad9150" id="sch.2-def.waterinjectionbore_"><txt break.before="1"><defterm guid="_204af5c6-65dd-45e4-ac52-be3fdf55c869" id="sch.2-def.waterinjectionbore" type="definition">water injection bore</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_59e0912d-ac1f-476c-a5ca-1dc172285fbc" id="sch.2-def.waterinjectionbore-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a bore to inject water or brine into a part of a geological formation or structure that is suitable to store water or brine; or</txt></block></li><li guid="_126cf63d-e4e6-4edd-8895-e9e4a32b7222" id="sch.2-def.waterinjectionbore-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a petroleum well that, under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.10" target.guid="_6f7f9284-5836-4486-b63b-35e219633886">part 10</intref>, <intref check="valid" refid="ch.2-pt.10-div.2" target.guid="_2ae4e436-80cf-43d4-a803-680fcf39b045">division 2</intref>, has been, or is taken to have been, converted to a water injection bore.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_a02b948f-5a01-43c7-b453-1b7e3353ffa1" id="sch.2-def.waterlicence_"><txt break.before="1"><defterm guid="_fbb9f9a6-3ce8-47b9-b673-4f5ba382babb" id="sch.2-def.waterlicence" type="definition">water licence</defterm> means a licence under the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref>.</txt></definition><definition affected.by.uncommenced="0" guid="_becf1be2-87fa-4d40-a5ac-84ed2e3e8fa0" id="sch.2-def.watermonitoringactivity_"><txt break.before="1"><defterm guid="_60ecfc0f-5550-4c6a-b7d5-1a765b0ac1f3" id="sch.2-def.watermonitoringactivity" type="definition">water monitoring activity</defterm> see <intref check="valid" refid="sec.187" target.guid="_86fcc4b4-2379-4e27-bd9a-33703220a7b4">section 187</intref><intref check="valid" refid="sec.187-ssec.2" target.guid="_cd19cc86-8aef-465d-9512-2c47438a9efa">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_4e44c7f8-e1aa-49bb-97c6-d1c8ad372c59" id="sch.2-def.watermonitoringauthority_"><txt break.before="1"><defterm guid="_210a098f-3b28-4b17-b548-a324f959e7ad" id="sch.2-def.watermonitoringauthority" type="definition">water monitoring authority</defterm> see <intref check="valid" refid="sec.18" target.guid="_00606342-13a2-49f5-a337-6c1f809e1f2e">section 18</intref><intref check="valid" refid="sec.18-ssec.1" target.guid="_b50a8cff-43ef-47e2-9531-603839cf5b0c">(1)</intref><intref check="valid" refid="sec.18-ssec.1-para1.d" target.guid="_9f4f3b7e-746e-4c4c-b2a4-bc33f2c6e669">(d)</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_43b64452-18a9-4869-aba3-f2098ad620c6" id="sch.2-def.waterobservationbore_"><txt break.before="1"><defterm guid="_f9e57f9c-9f02-4960-adb2-e43c9bc9196c" id="sch.2-def.waterobservationbore" type="definition">water observation bore</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_18f885c3-34c8-43ed-bb52-dd1e58eaebd6" id="sch.2-def.waterobservationbore-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">A <defterm guid="_f3092974-9cef-487d-87fb-4e89726b4c46" type="mention">water observation bore</defterm> is a bore to monitor water levels and includes—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_c726b064-f5a7-4e17-b6f6-89a101382191" id="sch.2-def.waterobservationbore-para1.1-para2.a" provision.type="other"><no>(a)</no><block><txt break.before="0">a petroleum well that, under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.10" target.guid="_6f7f9284-5836-4486-b63b-35e219633886">part 10</intref>, <intref check="valid" refid="ch.2-pt.10-div.2" target.guid="_2ae4e436-80cf-43d4-a803-680fcf39b045">division 2</intref>, has been, or is taken to have been, converted to a water observation bore; and</txt></block></li><li guid="_ca4e6e92-d759-4bc1-9481-8fc9c73b4080" id="sch.2-def.waterobservationbore-para1.1-para2.b" provision.type="other"><no>(b)</no><block><txt break.before="0">a water monitoring bore under the <legref check="valid" jurisd="QLD" target.doc.id="act-2000-034" target.version.series="e70e5508-125c-4cf6-a85e-c31ed22b7104" type="act"><name emphasis="no">Water Act</name></legref>.</txt></block></li></list></block></li><li guid="_9247cff8-60fb-477e-963f-3761a744b9c9" id="sch.2-def.waterobservationbore-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">A reference to a water observation bore includes its casing, wellhead and any other works constructed in connection with the bore.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_97b34331-71f5-433a-ad2d-5cab798e7403" id="sch.2-def.watersupplybore_"><txt break.before="1"><defterm guid="_177b99f9-3175-4e92-904f-54a4c0fb27af" id="sch.2-def.watersupplybore" type="definition">water supply bore</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_0548bb99-dbdf-4bb1-ad67-b85e9224ea5c" id="sch.2-def.watersupplybore-para1.1" provision.type="other"><no>1</no><block><txt break.before="0">A <defterm guid="_72782a19-5db3-443b-97ce-2c1bc6c70a95" type="mention">water supply bore</defterm> includes a petroleum well that, under <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.10" target.guid="_6f7f9284-5836-4486-b63b-35e219633886">part 10</intref>, <intref check="valid" refid="ch.2-pt.10-div.2" target.guid="_2ae4e436-80cf-43d4-a803-680fcf39b045">division 2</intref>, has been, or is taken to have been, converted to a water supply bore.</txt></block></li><li guid="_876ef64d-f22d-4c15-ab96-50323cfa9369" id="sch.2-def.watersupplybore-para1.2" provision.type="other"><no>2</no><block><txt break.before="0">A reference to a water supply bore includes its casing, wellhead and any other works constructed in connection with the bore.</txt></block></li></list></definition><definition affected.by.uncommenced="0" guid="_ba03f50f-f169-4c29-a577-1378846a71bf" id="sch.2-def.wellhead_"><txt break.before="1"><defterm guid="_364a74c9-d2a1-4af4-9d80-1d75db501944" id="sch.2-def.wellhead" type="definition">wellhead</defterm> means the casing head, and includes any casing hanger or spool, or tubing hanger, and any flow control equipment up to and including the wing valves.</txt></definition><definition affected.by.uncommenced="0" guid="_45bdb8bf-0837-4729-b2aa-660ea99f5d97" id="sch.2-def.wetgeothermalproduction_"><txt break.before="1"><defterm guid="_00448e6f-3734-486f-8dad-4b40169ae777" id="sch.2-def.wetgeothermalproduction" type="definition">wet geothermal production</defterm> means geothermal production by the extraction of hot water from a subartesian basin.</txt></definition><definition affected.by.uncommenced="0" change="ins" guid="_cea2d001-7299-4888-9ced-77a780358514" id="sch.2-def.WHSprosecutor_"><txt break.before="1"><defterm guid="_b2ea4405-dbe2-43f8-bdd9-8171ee6f9e61" id="sch.2-def.WHSprosecutor" type="definition">WHS prosecutor</defterm> see the <legref check="unknown" jurisd="QLD" type="act"><name emphasis="yes">Work Health and Safety Act 2011</name></legref>, schedule 2, section 25.</txt></definition><definition affected.by.uncommenced="0" change="insReplace" guid="_776cb0ad-36e9-4327-b74f-c7dd39ca644d" id="sch.2-def.worker_"><txt break.before="1"><defterm guid="_9f224eed-ec0e-4230-ae25-59c04445e73e" id="sch.2-def.worker" type="definition">worker</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li guid="_1160e555-f817-4a35-a656-c6e3aa047907" id="sch.2-def.worker-para1.a" provision.type="other"><no>(a)</no><block><txt break.before="0">in relation to an operating plant or gas work, for chapter 11, part 1AA, see section 799I(1); or</txt></block></li><li guid="_afd9211c-220d-4035-9ad1-19f2509a1c9c" id="sch.2-def.worker-para1.b" provision.type="other"><no>(b)</no><block><txt break.before="0">at a place, means a person who is employed or contracted to carry out work at the place, whether or not the work is gas work.</txt></block></li></list></definition><definition affected.by.uncommenced="0" change="insReplace" guid="_aeba9e97-20a9-41d6-82de-236523eadd8a" id="sch.2-def.workprogram_"><txt break.before="1"><defterm guid="_18cc53a4-8f34-4550-a5ae-9ed96fe1a363" id="sch.2-def.workprogram" type="definition">work program</defterm>, for an authority to prospect, see sections 23 and 45(1). </txt></definition><definition affected.by.uncommenced="0" change="ins" guid="_9fd7adc0-a0c8-4dec-ab9f-738da8379b56" id="sch.2-def.workprogramactivitiesbased_"><txt break.before="1"><defterm guid="_3b883aaa-3bd5-413e-85ee-6250225720c8" id="sch.2-def.workprogramactivitiesbased" type="definition">work program (activities-based)</defterm> see section 45(2).</txt></definition><definition affected.by.uncommenced="0" change="delReplace" guid="_f9f56856-4790-4cff-a0d0-84ac6a9ebb0b-del" id="sch.2-def.worker_-del"><txt break.before="1"><defterm guid="_73a290a3-b1af-4a0c-8726-6258a72f34cc-del" id="sch.2-def.worker-del" type="definition">worker</defterm>, at a place, means a person who is employed or contracted to carry out work at the place, whether or not the work is gas work.</txt></definition><definition affected.by.uncommenced="0" change="delReplace" guid="_bb0fecf6-e0d6-44cf-a915-b564430f542e-del" id="sch.2-def.workprogram_-del"><txt break.before="1"><defterm guid="_7055e192-eb35-43af-8ec8-d3780b1be0cb-del" id="sch.2-def.workprogram-del" type="definition">work program</defterm>, for an authority to prospect, see <intref check="valid" refid="sec.23" target.guid="_8c50aae0-9d0c-4434-bd98-23d4f2aa22d3">section 23</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_4257caca-85e2-47a3-91a5-a16dbf6a7561" id="sch.2-def.workprogramamendmentprovisions_"><txt break.before="1"><defterm guid="_6821d2d6-c54b-44a5-a38b-64791c1f9962" id="sch.2-def.workprogramamendmentprovisions" type="definition">work program amendment provisions</defterm> means <intref check="valid" refid="ch.2" target.guid="_8e52cdf0-cd9c-4fa5-ba1f-509552a7f7ad">chapter 2</intref>, <intref check="valid" refid="ch.2-pt.1" target.guid="_ae224c28-0e3b-4475-a663-d926bb3b8358">part 1</intref>, <intref check="valid" refid="ch.2-pt.1-div.3" target.guid="_68a7a1d9-c152-465c-9d27-7eebd1ad4060">division 3</intref>, <intref check="valid" refid="ch.2-pt.1-div.3-sdiv.6" target.guid="_32b497cb-19b1-442c-975a-0c9ddae56156">subdivision 6</intref>.</txt></definition><definition affected.by.uncommenced="0" guid="_36a3375a-e4fe-4840-9b7e-88863d9c9dcb" id="sch.2-def.workprogramcriteria_"><txt break.before="1"><defterm guid="_092dab9a-286f-485c-b72e-f2840684ac61" id="sch.2-def.workprogramcriteria" type="definition">work program criteria</defterm> see <intref check="valid" refid="sec.49" target.guid="_fc1a4d6c-39e0-45d0-afa8-14a9bfea6511">section 49</intref><intref check="valid" refid="sec.49-ssec.2" target.guid="_9e931d94-403f-40bd-93ba-39994453b72f">(2)</intref>.</txt></definition><definition affected.by.uncommenced="0" change="ins" guid="_986b116f-bc57-4661-b87b-88b8c78de75c" id="sch.2-def.workprogramoutcomesbased_"><txt break.before="1"><defterm guid="_36b037fe-2890-4d1e-9cad-f89711d40f6c" id="sch.2-def.workprogramoutcomesbased" type="definition">work program (outcomes-based)</defterm> see section 45(3).</txt></definition><definition affected.by.uncommenced="0" guid="_17a6bec5-c7fa-4cd5-a5c0-e7a95601721e" id="sch.2-def.worksdirection_"><txt break.before="1"><defterm guid="_62fc317d-ca5d-4a6b-abd1-684734db427e" id="sch.2-def.worksdirection" type="definition">works direction</defterm> see <intref check="valid" refid="sec.431" target.guid="_354af727-6927-42e9-b3ff-47c7a02721b6">section 431</intref><intref check="valid" refid="sec.431-ssec.2" target.guid="_49b014f2-6414-453b-975b-0bc8412be865">(2)</intref>.</txt></definition></deflist></block></schedule></schedules></act>