<?xml version="1.0" encoding="utf-8"?>
<!DOCTYPE subordleg PUBLIC "-//OQPC//DTD QuILLS Subordinate Legislation//EN" "Subordleg.dtd">
<!--************************************************************************************************************-->
<!--                                              DISCLAIMER                                                    -->
<!---->
<!--Queensland does not accept responsibility for the accuracy or completeness of material on this website      -->
<!--(or any other website referred to on this website) except as set out below. Users should exercise their     -->
<!--own skill and care in the use of the material.                                                              -->
<!---->
<!--No warranty is given that the material located on this site, or on any other site referred to on this site, -->
<!--is free from error or omission. Users should exercise their own skill and care with respect to the use of   -->
<!--the material. Accordingly, the State of Queensland and its servants and agents expressly disclaim liability -->
<!--for any act done or omission made in reliance on any such material and any consequences of any such act or  -->
<!--omission. This notice must not be erased.                                                                   -->
<!---->
<!--************************************************************************************************************-->
<subordleg title="Coastal Protection and Management Regulation 2017" year.published="2017" year.citation="2017" no="138" pco.reg.ref="S16_0170" publication.date="2023-09-01" enabling.title="Coastal Protection and Management Act 1995" enabling.acts="act-1995-041" sub.leg.type="reg" amending="consequential" print.type="reprint" first.valid.date="2023-09-01T00:00:00+10:00" in.force="allinforce" published.how="website" expiry.date="2027-09-01T00:00:00+10:00" stage.repeal="1" stage.repeal.original.date="2027-09-01T00:00:00+10:00" repealed.by="stagerepeal" repealing.id="act-1992-022" initial.admin.dept="Department of Environment and Heritage Protection" id="sl-2017-0138" version.desc.id="5fa4e16c-60d9-4129-ba2f-80ee8d7a5131" version.series.id="a2680299-4a9e-4151-a951-01001303c167"><coverdata id="cd" guid="_d546858d-b2ea-4b3d-98de-3b890fac92b7"><subtitle id="cd-sut" guid="_e0096db5-db68-492d-82c0-b70cde0d0091">Coastal Protection and Management Act 1995</subtitle></coverdata><wrapper><front id="frnt" guid="_624e6be2-a6d5-42c5-9193-e4da0f904618"><shorttitle id="frnt-st" guid="_c2247eb2-eebe-44e1-856b-a6f8ebf9b27c">Coastal Protection and Management Regulation 2017</shorttitle></front><body numbering.style="manual"><part id="pt.1" guid="_8471d468-415f-4329-9857-87464dc3edea" affected.by.uncommenced="0"><no>Part 1</no><heading id="pt.1-he" guid="_8dc094e5-1381-444c-8d0a-455c292b80e7">Preliminary</heading><clause id="sec.1" guid="_7d794fd7-12bc-4187-a09a-ed93c1d82f69" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>1</no><heading id="sec.1-he" guid="_b7092b05-0c1d-4f7b-a372-94fd0ad85586">Short title</heading><block><txt break.before="1">This regulation may be cited as the <legref jurisd="QLD" type="subordleg" target.doc.id="sl-2017-0138" target.version.series="a2680299-4a9e-4151-a951-01001303c167" check="valid"><name emphasis="yes">Coastal Protection and Management Regulation 2017</name></legref>.</txt></block></clause><clause id="sec.2" guid="_8e21c08c-94c5-4c92-9a9e-96d03dad8eef" affected.by.uncommenced="0" spent.amends="0" provision.type="commence"><no>2</no><heading id="sec.2-he" guid="_77ac3d9c-1f5f-43bc-b2f6-061dfb9cd434">Commencement</heading><block><txt break.before="1">This regulation commences on 1 September 2017.</txt></block></clause><clause id="sec.3" guid="_67368720-90d1-46bb-8698-bee17e5b9ba2" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>3</no><heading id="sec.3-he" guid="_403f2cd8-55c9-41a9-b629-a2b97b6c47a5">Dictionary</heading><block><txt break.before="1">The dictionary in <intref refid="sch.4" target.guid="_612a09e0-9a70-4c76-ab7a-54c077f64562" check="valid">schedule&#160;4</intref> defines particular words used in this regulation.</txt></block></clause></part><part id="pt.2" guid="_5d36bc80-617b-41c4-a3a1-80e0842ccfbe" affected.by.uncommenced="0"><no>Part 2</no><heading id="pt.2-he" guid="_3999932f-d37d-4041-9d1b-5a6ec97356bd">Coastal zone map and coastal management districts</heading><clause id="sec.4" guid="_33962bc0-3eca-48b5-ba1b-dfd24f2f0bf8" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>4</no><heading id="sec.4-he" guid="_0466137a-5a29-4f05-942b-d0008549e130">Approval of coastal zone map—<legref jurisd="QLD" type="act" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" check="valid">Act</legref>, <legref jurisd="QLD" type="act" refid="sec.18C" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" target.guid="_14501c47-2044-41a3-b159-7239ba7e5d89" check="valid">s&#160;18C</legref></heading><subclause id="sec.4-ssec.1" guid="_b913163f-466f-4c92-8e53-e4e6264fd4ee" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">For <legref jurisd="QLD" type="act" refid="sec.18C" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" target.guid="_14501c47-2044-41a3-b159-7239ba7e5d89" check="valid">section&#160;18C</legref> of the <legref jurisd="QLD" type="act" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" check="valid">Act</legref>, the map called ‘Coastal zone map for Queensland’, certified by the chief executive on 3 October 2011, is approved as the coastal zone map.</txt></block></subclause><subclause id="sec.4-ssec.2" guid="_e16effd1-c240-4909-84da-bf2d4489dea0" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The exact location of the boundary of the coastal zone shown on the map is held in digital electronic form by the department.</txt></block></subclause></clause><clause id="sec.5" guid="_d04985cf-6dd6-47a2-9888-c30884762258" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>5</no><heading id="sec.5-he" guid="_4b16bb9e-c913-4d8d-bd88-fa655a22002e">Coastal management district—<legref jurisd="QLD" type="act" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" check="valid">Act</legref>, <legref jurisd="QLD" type="act" refid="sec.54" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" target.guid="_76c405ba-b555-4422-b19c-541b31351865" check="valid">s&#160;54</legref></heading><subclause id="sec.5-ssec.1" guid="_75f8b57d-1dd0-436f-a10e-1b1c806fc37c" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">For <legref jurisd="QLD" type="act" refid="sec.54" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" target.guid="_76c405ba-b555-4422-b19c-541b31351865" check="valid">section&#160;54</legref><legref jurisd="QLD" type="act" check="invalid">(1)</legref> of the <legref jurisd="QLD" type="act" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" check="valid">Act</legref>, the declaration as a coastal management district, under the expired provision, of the area shown as a coastal management district on the map called ‘Coastal Management District For Queensland’, dated 17 November 2015 is continued in force.</txt></block></subclause><subclause id="sec.5-ssec.2" guid="_6e89d0d0-563f-4b16-a239-65e06ccdcfcc" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The exact location of the boundary of the coastal management district mentioned in <intref refid="sec.5-ssec.1" target.guid="_75f8b57d-1dd0-436f-a10e-1b1c806fc37c" check="valid">subsection&#160;(1)</intref> is held in digital electronic form by the department.</txt></block></subclause><subclause id="sec.5-ssec.3" guid="_2fe69fe8-e8b7-4b51-b224-c444abb96d7f" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sec.5-ssec.3-def.expiredprovision_" guid="_b9149a75-4044-4232-89cc-d7abdbd81711" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.5-ssec.3-def.expiredprovision" guid="_dbfa788d-566f-4680-ba74-08098df5d38e" type="definition">expired provision</defterm> means the <legref jurisd="QLD" type="subordleg" target.doc.id="sl-2003-0203" target.version.series="bffd5976-0c46-427a-974b-50342a51f2b2" check="valid"><name emphasis="yes">Coastal Protection and Management Regulation 2003</name></legref>, <legref jurisd="QLD" type="subordleg" refid="sec.4A" target.doc.id="sl-2003-0203" target.version.series="bffd5976-0c46-427a-974b-50342a51f2b2" check="invalid">section&#160;4A</legref> as in force immediately before the commencement.</txt></definition></deflist></block></subclause></clause><clause id="sec.6" guid="_8fc84e49-e4c9-4551-8481-a55f59aba899" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>6</no><heading id="sec.6-he" guid="_f332b73b-8dc9-4ecf-abc3-5786d4cfd448">Fixing coastal building lines—<legref jurisd="QLD" type="act" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" check="valid">Act</legref>, <legref jurisd="QLD" type="act" refid="sec.66" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" target.guid="_9ee933f6-02ab-47a5-9ad5-5ac1e4f1d537" check="valid">s&#160;66</legref></heading><subclause id="sec.6-ssec.1" guid="_dac2034e-06e2-4d02-8526-a3f72359c537" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">For <legref jurisd="QLD" type="act" refid="sec.66" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" target.guid="_9ee933f6-02ab-47a5-9ad5-5ac1e4f1d537" check="valid">section&#160;66</legref><legref jurisd="QLD" type="act" check="invalid">(1)</legref> of the <legref jurisd="QLD" type="act" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" check="valid">Act</legref>, each line shown on the map mentioned in <intref refid="sec.5" target.guid="_d04985cf-6dd6-47a2-9888-c30884762258" check="valid">section&#160;5</intref><intref refid="sec.5-ssec.1" target.guid="_75f8b57d-1dd0-436f-a10e-1b1c806fc37c" check="valid">(1)</intref> as a coastal building line for the coastal management district shown on the map is a coastal building line for the district.</txt></block></subclause><subclause id="sec.6-ssec.2" guid="_696cfdda-6b21-4c4c-8faf-cb827af19e87" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The exact location of each coastal building line is held in digital electronic form by the department.</txt></block></subclause></clause><clause id="sec.7" guid="_2d885f4c-dbb6-4c95-9884-91fe8388834b" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>7</no><heading id="sec.7-he" guid="_cf7b39ef-790f-48b1-afe7-a08029efefae">Access to maps and information held in digital electronic form</heading><subclause id="sec.7-ssec.1" guid="_39fcdcec-de4a-4c9e-b178-00a266dd3560" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">Each map, and the exact location of each boundary or coastal building line held in digital electronic form, mentioned in <intref refid="sec.4" target.guid="_33962bc0-3eca-48b5-ba1b-dfd24f2f0bf8" check="valid">sections&#160;4</intref> to <intref refid="sec.6" target.guid="_8fc84e49-e4c9-4551-8481-a55f59aba899" check="valid">6</intref> can be accessed, free of charge, on the department’s website.</txt></block></subclause><subclause id="sec.7-ssec.2" guid="_48db8574-3b42-4f1c-b44b-262865acb822" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The information held in digital electronic form can be reduced or enlarged to show the details of the boundary or coastal building line.</txt></block></subclause></clause></part><part id="pt.3" guid="_58819a5e-b66e-4267-aa3d-0742707ec0a4" affected.by.uncommenced="0"><no>Part 3</no><heading id="pt.3-he" guid="_5a9d007c-e6b3-4a0d-a567-99de6e071f47">Fees and royalties</heading><division id="pt.3-div.1" guid="_cb8d8df9-70fd-4d93-9155-c23df922bd5d" affected.by.uncommenced="0"><no>Division 1</no><heading id="pt.3-div.1-he" guid="_3af2adda-b0af-4e51-9a1c-ec8b877ccad8">Fees</heading><clause id="sec.8" guid="_5166bb47-b9f6-4f49-8725-c020cc6ba32c" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>8</no><heading id="sec.8-he" guid="_73826454-2bba-4002-bd05-3418e1d4afc5">Fees</heading><block><txt break.before="1">The fees payable under the <legref jurisd="QLD" type="act" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" check="valid">Act</legref> in relation to an allocation are stated in <intref refid="sch.1" target.guid="_672b6a51-f5bb-4737-9d3d-09bdd228c6cc" check="valid">schedule&#160;1</intref>.</txt></block></clause></division><division id="pt.3-div.2" guid="_ae298f7b-437f-4b2e-8426-6ed675d7a870" affected.by.uncommenced="0"><no>Division 2</no><heading id="pt.3-div.2-he" guid="_2c7a58b8-8c30-4584-8a90-cc9dfc0c3512">Royalties</heading><clause id="sec.9" guid="_48f63792-0602-4071-84f8-ad292690c353" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>9</no><heading id="sec.9-he" guid="_e34c195b-5f23-43e3-8528-f03948d23909">Rate of royalty—<legref jurisd="QLD" type="act" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" check="valid">Act</legref>, <legref jurisd="QLD" type="act" refid="sec.102" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" target.guid="_331fda2f-f13b-4c84-9e0a-963fc27858eb" check="valid">s&#160;102</legref></heading><block><txt break.before="1">For <legref jurisd="QLD" type="act" refid="sec.102" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" target.guid="_331fda2f-f13b-4c84-9e0a-963fc27858eb" check="valid">section&#160;102</legref><legref jurisd="QLD" type="act" check="invalid">(1)</legref> of the <legref jurisd="QLD" type="act" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" check="valid">Act</legref>, the rate at which royalty is payable is stated in <intref refid="sch.2" target.guid="_5caf0943-b3fb-458c-afcf-0cd88600f0a0" check="valid">schedule&#160;2</intref>.</txt></block></clause><clause id="sec.10" guid="_c50dd9ed-f1b0-4dda-8855-e00a919315f5" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>10</no><heading id="sec.10-he" guid="_0b084fe1-9276-42ca-8384-f6b41582770f">When royalty payable—<legref jurisd="QLD" type="act" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" check="valid">Act</legref>, <legref jurisd="QLD" type="act" refid="sec.102" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" target.guid="_331fda2f-f13b-4c84-9e0a-963fc27858eb" check="valid">s&#160;102</legref></heading><block><txt break.before="1">For <legref jurisd="QLD" type="act" refid="sec.102" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" target.guid="_331fda2f-f13b-4c84-9e0a-963fc27858eb" check="valid">section&#160;102</legref><legref jurisd="QLD" type="act" check="invalid">(1)</legref> of the <legref jurisd="QLD" type="act" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" check="valid">Act</legref>, royalty is payable for quarry material removed under an allocation notice when a notice mentioned in <legref jurisd="QLD" type="act" refid="sec.80" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" target.guid="_1b9e0dd0-73a9-4344-8009-1251bd01a1a4" check="valid">section&#160;80</legref><legref jurisd="QLD" type="act" check="invalid">(2)</legref> of the <legref jurisd="QLD" type="act" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" check="valid">Act</legref> is given to the chief executive for the removal.</txt></block></clause><clause id="sec.11" guid="_ec1baf9f-9109-4c0f-8800-7ca7cb6712d5" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>11</no><heading id="sec.11-he" guid="_bd5cad04-3964-4ecc-a760-4080d5cee30a">Royalty not payable for particular transport-related matters</heading><subclause id="sec.11-ssec.1" guid="_84eb0e50-7269-4556-92cd-3b0363c3630d" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">No royalty is payable for quarry material removed by any of the following persons if the conditions stated in <intref refid="sec.11-ssec.2" target.guid="_2cf25603-d4ed-419a-baaa-6e32eec73967" check="valid">subsection&#160;(2)</intref> are satisfied in relation to the removal—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.11-ssec.1-para1.a" guid="_33c74685-1c4a-4b42-af4c-26a312624c7a" provision.type="other" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="0">the chief executive of the department in which the <legref jurisd="QLD" type="act" target.doc.id="act-1994-008" target.version.series="060a2469-1586-4719-b2aa-d22cc9ff8daf" check="valid"><name emphasis="yes">Transport Infrastructure Act 1994</name></legref>, to the extent it relates to transport infrastructure other than roads, is administered;</txt></block></li><li id="sec.11-ssec.1-para1.b" guid="_3fb8fa1b-5c72-476c-af65-7eac28a7421b" provision.type="other" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="0">a person who manages a public marine facility;</txt></block></li><li id="sec.11-ssec.1-para1.c" guid="_20ece651-4af6-4e94-9f8b-096d2e16d02b" provision.type="other" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="0">a person who is removing the quarry material for a person mentioned in <intref refid="sec.11-ssec.1-para1.a" target.guid="_33c74685-1c4a-4b42-af4c-26a312624c7a" check="valid">paragraph&#160;(a)</intref> or <intref refid="sec.11-ssec.1-para1.b" target.guid="_3fb8fa1b-5c72-476c-af65-7eac28a7421b" check="valid">(b)</intref>.</txt></block></li></list></block></subclause><subclause id="sec.11-ssec.2" guid="_2cf25603-d4ed-419a-baaa-6e32eec73967" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">For <intref refid="sec.11-ssec.1" target.guid="_84eb0e50-7269-4556-92cd-3b0363c3630d" check="valid">subsection&#160;(1)</intref>, the conditions are—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.11-ssec.2-para1.a" guid="_5c8694e1-83c1-473b-884e-949b0a9f77fb" provision.type="other" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="0">the person removes the material to develop, maintain or improve navigational channels; and</txt></block></li><li id="sec.11-ssec.2-para1.b" guid="_50e527fc-83d7-4986-8340-ecab2f0267d6" provision.type="other" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="0">the person disposes of the material on land; and</txt></block></li><li id="sec.11-ssec.2-para1.c" guid="_7bf2cbfe-1aec-4a9d-9f1f-3795db9da615" provision.type="other" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="0">the material is to be used for—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.11-ssec.2-para1.c-para2.i" guid="_f48db7a0-4d3f-462b-b1d0-588d663b8d79" provision.type="other" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="0">beach nourishment, filling or reclamation purposes; or</txt></block></li><li id="sec.11-ssec.2-para1.c-para2.ii" guid="_77c9ade6-a436-4ef9-9ffb-0b20935833e8" provision.type="other" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="0">another purpose that does not involve the sale of any of the material.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.11-ssec.3" guid="_f01b235e-12f3-4ab4-a76f-d30902311c98" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">No royalty is payable by a port authority, port lessor, port lessee or port manager for quarry material removed—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.11-ssec.3-para1.a" guid="_e55a83fa-3317-498b-8197-75fa75c801ea" provision.type="other" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="0">to maintain or improve navigational channels or navigation in its port if the material is disposed of—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.11-ssec.3-para1.a-para2.i" guid="_a4463a23-2eef-4822-b26a-92b37536ab82" provision.type="other" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="0">in an area associated with port activities and approved by the Minister of the department in which the <legref jurisd="QLD" type="act" target.doc.id="act-1994-008" target.version.series="060a2469-1586-4719-b2aa-d22cc9ff8daf" check="valid"><name emphasis="yes">Transport Infrastructure Act 1994</name></legref> is administered; and</txt></block></li><li id="sec.11-ssec.3-para1.a-para2.ii" guid="_571c3148-4835-42b1-a71f-965866299da2" provision.type="other" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="0">under relevant statutory environmental controls; or</txt></block></li></list></block></li><li id="sec.11-ssec.3-para1.b" guid="_af30bbf0-7996-4d50-805b-4bab07ff8418" provision.type="other" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="0">to reclaim land that is, or is proposed to be, strategic port land or Brisbane core port land under the <legref jurisd="QLD" type="act" target.doc.id="act-1994-008" target.version.series="060a2469-1586-4719-b2aa-d22cc9ff8daf" check="valid"><name emphasis="yes">Transport Infrastructure Act 1994</name></legref>.</txt></block></li></list></block></subclause><subclause id="sec.11-ssec.4" guid="_42bb6f2c-bb38-4020-b936-9ed141128d93" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sec.11-ssec.4-def.portlessee_" guid="_b8361ce9-8826-4ce2-8151-54b589f765d2" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.11-ssec.4-def.portlessee" guid="_fbd0ce38-f22e-475b-aab6-d66b0d7b8dec" type="definition">port lessee</defterm> see the <legref jurisd="QLD" type="act" target.doc.id="act-1994-008" target.version.series="060a2469-1586-4719-b2aa-d22cc9ff8daf" check="valid"><name emphasis="yes">Transport Infrastructure Act 1994</name></legref>, <legref jurisd="QLD" type="act" refid="sec.267" target.doc.id="act-1994-008" target.version.series="060a2469-1586-4719-b2aa-d22cc9ff8daf" target.guid="_734d727b-db75-4a20-9951-fde63d88df71" check="valid">section&#160;267</legref>.</txt></definition><definition id="sec.11-ssec.4-def.portlessor_" guid="_5a78e7bb-8028-4385-8e6b-19a3eafdedaf" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.11-ssec.4-def.portlessor" guid="_7b0bb97f-568e-4f4b-9e16-c1384de9edc8" type="definition">port lessor</defterm> see the <legref jurisd="QLD" type="act" target.doc.id="act-1994-008" target.version.series="060a2469-1586-4719-b2aa-d22cc9ff8daf" check="valid"><name emphasis="yes">Transport Infrastructure Act 1994</name></legref>, <legref jurisd="QLD" type="act" refid="sec.267" target.doc.id="act-1994-008" target.version.series="060a2469-1586-4719-b2aa-d22cc9ff8daf" target.guid="_734d727b-db75-4a20-9951-fde63d88df71" check="valid">section&#160;267</legref>.</txt></definition><definition id="sec.11-ssec.4-def.portmanager_" guid="_354e98fb-7a66-44c2-84f1-2ef5ced40907" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.11-ssec.4-def.portmanager" guid="_7033d758-6e67-46cb-8be8-2ed30fc16d64" type="definition">port manager</defterm> see the <legref jurisd="QLD" type="act" target.doc.id="act-1994-008" target.version.series="060a2469-1586-4719-b2aa-d22cc9ff8daf" check="valid"><name emphasis="yes">Transport Infrastructure Act 1994</name></legref>, <legref jurisd="QLD" type="act" refid="sec.267" target.doc.id="act-1994-008" target.version.series="060a2469-1586-4719-b2aa-d22cc9ff8daf" target.guid="_734d727b-db75-4a20-9951-fde63d88df71" check="valid">section&#160;267</legref>.</txt></definition></deflist></block></subclause></clause><clause id="sec.12" guid="_71edb7b3-8147-478a-8545-cd6ef9b32a9d" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>12</no><heading id="sec.12-he" guid="_3c25b7c6-78d5-434d-bb1d-b5531a93f6cb">Royalty not payable for removal of quarry material for particular purposes</heading><block><txt break.before="1">No royalty is payable by a person for quarry material removed under an allocation notice if, at the time a royalty for the material would have been payable under <intref refid="sec.10" target.guid="_c50dd9ed-f1b0-4dda-8855-e00a919315f5" check="valid">section&#160;10</intref>, the material—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.12-para1.a" guid="_ef651633-b78d-452a-96e2-92b4396b4f26" provision.type="other" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="0">has been, or is being, used for beach nourishment for which the person has a development approval; or</txt></block></li><li id="sec.12-para1.b" guid="_7aa8af41-944b-4a54-974c-7b428ced26fa" provision.type="other" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="0">is mostly mud, silt, or clay that has been, or is being, disposed of on land for filling or reclamation purposes; or</txt></block></li><li id="sec.12-para1.c" guid="_84387f1c-0222-43e3-9994-938e575f88f0" provision.type="other" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="0">has been, or is being, placed on land to avoid an adverse effect, or a potential adverse effect, on the environment.</txt></block></li></list></block></clause></division><division id="pt.3-div.3" guid="_e222ae78-cc30-4385-853c-d58c7c0050c1" affected.by.uncommenced="0"><no>Division 3</no><heading id="pt.3-div.3-he" guid="_5f3765c6-f664-44d4-8806-9752ce2282cf">Rounding in relation to fee units</heading><historynote><txt break.before="1"><b>pt&#160;3 div&#160;3 hdg</b> ins <legref jurisd="QLD" type="subordleg" target.doc.id="sl-2022-0017" target.version.series="31fda843-cd1f-41b0-8e19-e17ec9eb126b" valid.date="as.made" check="valid">2022 SL&#160;No.&#160;17</legref> <legref jurisd="QLD" type="subordleg" refid="sec.3" target.doc.id="sl-2022-0017" target.version.series="31fda843-cd1f-41b0-8e19-e17ec9eb126b" target.guid="_395479d5-fbdc-4592-9e5c-286ec9ec940b" valid.date="as.made" check="valid">s&#160;3</legref></txt></historynote><clause id="sec.12A" guid="_ec271b81-0c03-408d-8bf6-ca91131a5dbe" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>12A</no><heading id="sec.12A-he" guid="_b0b90853-5e9c-4c4d-a49a-84ecf9b41f8c">Rounding of amounts expressed as numbers of fee units</heading><subclause id="sec.12A-ssec.1" guid="_2367e1ed-448b-4117-a096-9976003297ef" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies for working out the amount of a fee or other matter expressed in this regulation as a number of fee units.</txt></block></subclause><subclause id="sec.12A-ssec.2" guid="_0ce393ee-84a4-4164-b710-169d2aefe7f3" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">For the purpose of the <legref jurisd="QLD" type="act" target.doc.id="act-1954-003" target.version.series="3cfb010e-ce09-4afd-baf6-bd10d22741a7" check="valid"><name emphasis="yes">Acts Interpretation Act 1954</name></legref>, <legref jurisd="QLD" type="act" refid="sec.48C" target.doc.id="act-1954-003" target.version.series="3cfb010e-ce09-4afd-baf6-bd10d22741a7" target.guid="_cbebcacf-67b6-43d8-af67-a013f11c3568" check="valid">section&#160;48C</legref><legref jurisd="QLD" type="act" refid="sec.48C-ssec.3" target.doc.id="act-1954-003" target.version.series="3cfb010e-ce09-4afd-baf6-bd10d22741a7" target.guid="_7036aee6-f2a2-4301-a026-ea4cb2bbbc6f" check="valid">(3)</legref>, the amount is to be rounded—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.12A-ssec.2-para1.a" guid="_4b2bf55a-b534-4fb5-9148-481ce0da419f" provision.type="other" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="0">if the result is not more than $2.50—to the nearest cent (rounding one-half upwards); or</txt></block></li><li id="sec.12A-ssec.2-para1.b" guid="_d39dc1fb-a4bc-4d43-b44b-7d0f4fcdfed8" provision.type="other" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="0">if the result is more than $2.50 but not more than $100—to the nearest multiple of 5 cents (rounding one-half upwards); or</txt></block></li><li id="sec.12A-ssec.2-para1.c" guid="_db0a871e-c265-4796-946f-a6d4d694df8c" provision.type="other" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="0">if the result is more than $100 but not more than $500—to the nearest multiple of 10 cents (rounding one-half upwards); or</txt></block></li><li id="sec.12A-ssec.2-para1.d" guid="_5b97d3cd-4e53-4027-b30f-1b81ea86b528" provision.type="other" affected.by.uncommenced="0"><no>(d)</no><block><txt break.before="0">if the result is more than $500—to the nearest dollar (rounding one-half upwards). </txt></block></li></list></block></subclause><historynote><txt break.before="1"><b>s&#160;12A</b> ins <legref jurisd="QLD" type="subordleg" target.doc.id="sl-2022-0017" target.version.series="31fda843-cd1f-41b0-8e19-e17ec9eb126b" valid.date="as.made" check="valid">2022 SL&#160;No.&#160;17</legref> <legref jurisd="QLD" type="subordleg" refid="sec.3" target.doc.id="sl-2022-0017" target.version.series="31fda843-cd1f-41b0-8e19-e17ec9eb126b" target.guid="_395479d5-fbdc-4592-9e5c-286ec9ec940b" valid.date="as.made" check="valid">s&#160;3</legref></txt></historynote></clause></division></part><part id="pt.4" guid="_e92c6be8-8de0-4198-8725-770c90a5f6bb" affected.by.uncommenced="0"><no>Part 4</no><heading id="pt.4-he" guid="_110d34fc-189f-4f08-a640-cabc836aaef7">Tidal works</heading><clause id="sec.13" guid="_a45fd576-ccd9-4683-87bc-9f326be10108" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>13</no><heading id="sec.13-he" guid="_aef8611f-8e4e-4685-8c46-fee04d533d5b">Assessment benchmarks for particular prescribed tidal works—<legref jurisd="QLD" type="act" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" check="valid">Act</legref>, <legref jurisd="QLD" type="act" refid="sec.167" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" target.guid="_948a8289-b939-442f-8328-457e5d24ff6d" check="valid">s&#160;167</legref></heading><subclause id="sec.13-ssec.1" guid="_fd432d70-1d0c-4e79-8fe4-fac3b7a58d62" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to a development application for, or a change application relating to, assessable development that is prescribed tidal works, if the planning chief executive is not the assessment manager or responsible entity for the application.</txt></block></subclause><subclause id="sec.13-ssec.2" guid="_d42f364a-61b3-4d45-b13e-cde2d2aa7fab" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">For <legref jurisd="QLD" type="act" refid="sec.167" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" target.guid="_948a8289-b939-442f-8328-457e5d24ff6d" check="valid">section&#160;167</legref><legref jurisd="QLD" type="act" check="invalid">(5)</legref><legref jurisd="QLD" type="act" check="invalid">(a)</legref> and <legref jurisd="QLD" type="act" check="invalid">(c)</legref> of the <legref jurisd="QLD" type="act" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" check="valid">Act</legref>, the code in <intref refid="sch.3" target.guid="_6c4de702-c4d8-4eb7-b318-80d1200dd180" check="valid">schedule&#160;3</intref>—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.13-ssec.2-para1.a" guid="_16843522-6b82-42df-bdee-b9812045552c" provision.type="other" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="0">is prescribed as an assessment benchmark for the <legref jurisd="QLD" type="act" target.doc.id="act-2016-025" target.version.series="d4a7e9d3-f73d-48a3-9459-9be0b66a1c15" check="valid"><name emphasis="no">Planning Act</name></legref> for the assessable development; and</txt></block></li><li id="sec.13-ssec.2-para1.b" guid="_0c152ac4-eff7-41f5-b24b-3d717eabc527" provision.type="other" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="0">prescribes, for the <legref jurisd="QLD" type="act" target.doc.id="act-2016-025" target.version.series="d4a7e9d3-f73d-48a3-9459-9be0b66a1c15" check="valid"><name emphasis="no">Planning Act</name></legref>, <legref jurisd="QLD" type="act" refid="sec.19" target.doc.id="act-2016-025" target.version.series="d4a7e9d3-f73d-48a3-9459-9be0b66a1c15" target.guid="_86b48efe-9c19-4650-a193-78cc79f0d83b" check="valid">section&#160;19</legref><legref jurisd="QLD" type="act" refid="sec.19-ssec.1" target.doc.id="act-2016-025" target.version.series="d4a7e9d3-f73d-48a3-9459-9be0b66a1c15" target.guid="_06861ecc-3cb7-4936-bb19-848154ba657a" check="valid">(1)</legref><legref jurisd="QLD" type="act" refid="sec.19-ssec.1-para1.b" target.doc.id="act-2016-025" target.version.series="d4a7e9d3-f73d-48a3-9459-9be0b66a1c15" target.guid="_05882229-0d4d-4b9b-99be-1640dfba91b1" check="valid">(b)</legref>, the extent to which a local government may apply a planning scheme as a categorising instrument under that Act in relation to tidal works in the tidal area for its local government area, as defined under that Act.</txt></block></li></list></block></subclause></clause><clause id="sec.14" guid="_4a976797-8ae7-4350-ba05-107adc6e4064" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>14</no><heading id="sec.14-he" guid="_12bb7a00-6dd3-4944-a1cc-ff4a57bcf073">Requirements for accepted development—<legref jurisd="QLD" type="act" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" check="valid">Act</legref>, <legref jurisd="QLD" type="act" refid="sec.167" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" target.guid="_948a8289-b939-442f-8328-457e5d24ff6d" check="valid">s&#160;167</legref></heading><subclause id="sec.14-ssec.1" guid="_9daa0e88-aa9a-4e5f-93d6-911a25affe93" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to operational work stated in the <legref jurisd="QLD" type="subordleg" target.doc.id="sl-2017-0078" target.version.series="1429b632-9362-4bc1-9b40-f08f8680dad4" check="valid"><name emphasis="yes">Planning Regulation 2017</name></legref>, <legref jurisd="QLD" type="subordleg" refid="sch.7" target.doc.id="sl-2017-0078" target.version.series="1429b632-9362-4bc1-9b40-f08f8680dad4" target.guid="_e876dc4e-f8ea-4942-9f65-feb8808ed258" check="valid">schedule&#160;7</legref>, <legref jurisd="QLD" type="subordleg" refid="sch.7-sec.10" target.doc.id="sl-2017-0078" target.version.series="1429b632-9362-4bc1-9b40-f08f8680dad4" target.guid="_a5400aeb-c765-4aed-b277-1945a0d9e114" check="valid">section&#160;10</legref><legref jurisd="QLD" type="subordleg" check="invalid">(a)</legref>, if undertaken by an entity mentioned in the <legref jurisd="QLD" type="subordleg" target.doc.id="sl-2017-0078" target.version.series="1429b632-9362-4bc1-9b40-f08f8680dad4" check="valid"><name emphasis="yes">Planning Regulation 2017</name></legref>, <legref jurisd="QLD" type="subordleg" refid="sch.7" target.doc.id="sl-2017-0078" target.version.series="1429b632-9362-4bc1-9b40-f08f8680dad4" target.guid="_e876dc4e-f8ea-4942-9f65-feb8808ed258" check="valid">schedule&#160;7</legref>, <legref jurisd="QLD" type="subordleg" refid="sch.7-sec.10" target.doc.id="sl-2017-0078" target.version.series="1429b632-9362-4bc1-9b40-f08f8680dad4" target.guid="_a5400aeb-c765-4aed-b277-1945a0d9e114" check="valid">section&#160;10</legref><legref jurisd="QLD" type="subordleg" check="invalid">(b)</legref>.</txt></block></subclause><subclause id="sec.14-ssec.2" guid="_d4c98d07-ef96-4d8a-9c9c-b4fd6ee77262" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">For <legref jurisd="QLD" type="act" refid="sec.167" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" target.guid="_948a8289-b939-442f-8328-457e5d24ff6d" check="valid">section&#160;167</legref><legref jurisd="QLD" type="act" check="invalid">(5)</legref><legref jurisd="QLD" type="act" check="invalid">(b)</legref> of the <legref jurisd="QLD" type="act" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" check="valid">Act</legref>, the operational work must comply with the document called ‘Code for accepted development—For tidal works, or work completely or partly in a coastal management district’ dated August 2017 and published on the department’s website.</txt></block></subclause></clause><clause id="sec.15" guid="_6f7bc87e-3fa6-4e4e-99ef-a966e02f52ed" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>15</no><heading id="sec.15-he" guid="_2315149b-f736-439d-90b3-0f864ec58e3c">Tidal works that are prescribed tidal works—<legref jurisd="QLD" type="act" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" check="valid">Act</legref>, <legref jurisd="QLD" type="act" refid="sec.167" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" target.guid="_948a8289-b939-442f-8328-457e5d24ff6d" check="valid">s&#160;167</legref></heading><subclause id="sec.15-ssec.1" guid="_a10f8798-ea96-4db8-b135-2ace19ab6f79" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">Subject to <intref refid="sec.15-ssec.2" target.guid="_48ca901b-c1b9-48f5-94a0-08038783e449" check="valid">subsection&#160;(2)</intref>, the following works are prescribed tidal works for <legref jurisd="QLD" type="act" refid="sec.167" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" target.guid="_948a8289-b939-442f-8328-457e5d24ff6d" check="valid">section&#160;167</legref><legref jurisd="QLD" type="act" check="invalid">(5)</legref><legref jurisd="QLD" type="act" check="invalid">(d)</legref> of the <legref jurisd="QLD" type="act" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" check="valid">Act</legref>—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.15-ssec.1-para1.a" guid="_41d2515e-05b0-42fc-af61-85a1d22510c5" provision.type="other" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="0">works that consist only of tidal works;</txt></block></li><li id="sec.15-ssec.1-para1.b" guid="_08acf3be-f38a-456e-bd58-95565fc0c076" provision.type="other" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="0">works that consist of both—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.15-ssec.1-para1.b-para2.i" guid="_dcc3eef6-3707-45ab-97ff-c7b03592568c" provision.type="other" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="0">tidal works; and</txt></block></li><li id="sec.15-ssec.1-para1.b-para2.ii" guid="_e21bbc41-2835-43a0-9699-35321a2208f0" provision.type="other" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="0">other work that is not tidal works if the other work is an integral part of the tidal works.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.15-ssec.2" guid="_48ca901b-c1b9-48f5-94a0-08038783e449" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The following works are not prescribed tidal works—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.15-ssec.2-para1.a" guid="_b6960be5-2a93-4973-9cf6-56b982c9997e" provision.type="other" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="0">tidal works within a State managed boat harbour;</txt></block></li><li id="sec.15-ssec.2-para1.b" guid="_173699c2-ba81-44a3-861d-d109936f71b9" provision.type="other" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="0">tidal works for a new or existing structure used for the operation of—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.15-ssec.2-para1.b-para2.i" guid="_a342e73f-dbe8-4a4b-822b-3dcf7febf5a8" provision.type="other" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="0">a port authority or port operator; or</txt></block></li><li id="sec.15-ssec.2-para1.b-para2.ii" guid="_b5d50f56-c0a9-4796-ac46-d85068dcb058" provision.type="other" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="0">a public marine facility constructed by or for the Gold Coast Waterways Authority, Queensland Transport, a port authority or a port operator;</txt></block></li></list></block></li><li id="sec.15-ssec.2-para1.c" guid="_f2d469b4-0151-4b91-86ba-0f0d087728e2" provision.type="other" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="0">tidal works for any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.15-ssec.2-para1.c-para2.i" guid="_e95bffbb-17f3-4cf2-8733-9c103798c3b5" provision.type="other" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="0">creating or changing the configuration or characteristics of a navigational channel;</txt></block></li><li id="sec.15-ssec.2-para1.c-para2.ii" guid="_24224258-bb4f-4434-866f-81603434ca64" provision.type="other" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="0">an inlet or outlet for development for aquaculture if the development is carried out on land and is made accepted development under the local government’s planning scheme or is development requiring code assessment under the <legref jurisd="QLD" type="act" target.doc.id="act-2016-025" target.version.series="d4a7e9d3-f73d-48a3-9459-9be0b66a1c15" check="valid"><name emphasis="no">Planning Act</name></legref>;</txt></block></li></list></block></li><li id="sec.15-ssec.2-para1.d" guid="_a3121c61-9b6a-45a4-9b9e-3e6f62d3eb8a" provision.type="other" affected.by.uncommenced="0"><no>(d)</no><block><txt break.before="0">tidal works the subject of—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.15-ssec.2-para1.d-para2.i" guid="_fb002d24-a0a2-44fd-90c8-bf6493382c2e" provision.type="other" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="0">a deemed approval; or</txt></block></li><li id="sec.15-ssec.2-para1.d-para2.ii" guid="_115dbdea-a8d5-43ec-ae81-e4d863308aa7" provision.type="other" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="0">a development approval given under the repealed <legref jurisd="QLD" type="act" target.doc.id="act-1997-069" target.version.series="83a4d97d-ec47-4fa9-9a92-248d9d0d703d" check="valid"><name emphasis="yes">Integrated Planning Act 1997</name></legref> on or before 20 October 2003.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.15-ssec.3" guid="_65b6b543-e44a-4504-a7bd-e2fc78b24b07" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sec.15-ssec.3-def.aquaculture_" guid="_602e1ac5-ae40-41bf-8940-d70dd19588c3" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.15-ssec.3-def.aquaculture" guid="_bdc7af7f-20e8-4cfa-b871-41758dfae4aa" type="definition">aquaculture</defterm> see the <legref jurisd="QLD" type="act" target.doc.id="act-1994-037" target.version.series="d7ebcb19-f312-46a5-9a6f-59793df30f39" check="valid"><name emphasis="yes">Fisheries Act 1994</name></legref>, <legref jurisd="QLD" type="act" refid="sch.1" target.doc.id="act-1994-037" target.version.series="d7ebcb19-f312-46a5-9a6f-59793df30f39" target.guid="_9675e921-7f86-402f-8271-aa27e9433571" check="valid">schedule&#160;1</legref>.</txt></definition><definition id="sec.15-ssec.3-def.QueenslandTransport_" guid="_3c386a00-5055-4030-888b-a84a37826825" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.15-ssec.3-def.QueenslandTransport" guid="_a9bc00cb-8e61-4ac9-84fa-1ed8551cc3c6" type="definition">Queensland Transport</defterm> means the department in which the <legref jurisd="QLD" type="act" target.doc.id="act-1994-014" target.version.series="44f453e2-ccd9-4a10-af83-c3dccd6d5dbe" check="valid"><name emphasis="yes">Transport Operations (Marine Safety) Act 1994</name></legref> is administered.</txt></definition><definition id="sec.15-ssec.3-def.Statemanagedboatharbour_" guid="_fab68f98-2078-4ccb-8068-4bda091e8c97" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.15-ssec.3-def.Statemanagedboatharbour" guid="_2c6f540b-084c-460b-909e-d1b751a425e6" type="definition">State managed boat harbour</defterm> see the <legref jurisd="QLD" type="subordleg" target.doc.id="sl-2023-0110" target.version.series="55c14ac4-75c4-403b-b1e1-a863d80dfadf" check="valid"><name emphasis="yes">Transport Infrastructure (Public Marine Facilities) Regulation 2023</name></legref>, <legref jurisd="QLD" type="subordleg" refid="sch.4" target.doc.id="sl-2023-0110" target.version.series="55c14ac4-75c4-403b-b1e1-a863d80dfadf" target.guid="_48c0621f-8d12-4345-8720-bef2f67a0856" check="valid">schedule&#160;4</legref>.</txt></definition></deflist></block></subclause><historynote><txt break.before="1"><b>s&#160;15</b> amd <legref jurisd="QLD" type="subordleg" target.doc.id="sl-2019-0071" target.version.series="681a5c0a-4ee9-43be-b2d4-5d5fa4aab3c5" valid.date="as.made" check="valid">2019 SL&#160;No.&#160;71</legref> <legref jurisd="QLD" type="subordleg" refid="sec.59" target.doc.id="sl-2019-0071" target.version.series="681a5c0a-4ee9-43be-b2d4-5d5fa4aab3c5" target.guid="_d17a0b98-43d4-4878-9a4c-c6d0c9ded1a2" valid.date="as.made" check="valid">s&#160;59</legref> <legref jurisd="QLD" type="subordleg" refid="sch.1" target.doc.id="sl-2019-0071" target.version.series="681a5c0a-4ee9-43be-b2d4-5d5fa4aab3c5" target.guid="_238f39fd-3943-4b06-b559-c91956520317" valid.date="as.made" check="valid">sch&#160;1</legref>; <legref jurisd="QLD" type="subordleg" target.doc.id="sl-2023-0110" target.version.series="55c14ac4-75c4-403b-b1e1-a863d80dfadf" valid.date="as.made" check="valid">2023 SL&#160;No.&#160;110</legref> <legref jurisd="QLD" type="subordleg" refid="sec.119" target.doc.id="sl-2023-0110" target.version.series="55c14ac4-75c4-403b-b1e1-a863d80dfadf" target.guid="_bd88f46c-c37a-45b2-bcf5-c3003f6da8ab" valid.date="as.made" check="valid">s&#160;119</legref></txt></historynote></clause></part><part id="pt.5" guid="_a92712fb-76a4-453a-af12-4d937ba6f09a" affected.by.uncommenced="0"><no>Part 5</no><heading id="pt.5-he" guid="_aeba90a0-956c-4e56-b645-f037f76cb877">Transitional provision</heading><clause id="sec.16" guid="_706e420a-6a16-4959-b6e8-85a83a9c2d0e" affected.by.uncommenced="0" spent.amends="0" provision.type="transitional"><no>16</no><heading id="sec.16-he" guid="_4e012fe9-194e-4076-a356-5074a765fcf9">Existing development applications</heading><subclause id="sec.16-ssec.1" guid="_caf724ac-768e-4317-b63a-5a195b885bd1" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to a development application for prescribed tidal works made, but not decided, before the commencement.</txt></block></subclause><subclause id="sec.16-ssec.2" guid="_993ddda4-695b-47be-af61-5d2f44eb3b54" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">Previous schedule&#160;4A continues to apply in relation to deciding the application.</txt></block></subclause><subclause id="sec.16-ssec.3" guid="_5c850bb3-a25e-4c25-9a8f-33bc16aecbf2" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sec.16-ssec.3-def.previousschedule4A_" guid="_28d5ec22-4a4a-40d5-b4a0-fd00d5a136fd" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.16-ssec.3-def.previousschedule4A" guid="_8f5877a3-b9a0-4937-a6e2-e059c8797224" type="definition">previous schedule&#160;4A</defterm> means the <i>Coastal Protection and Management Regulation 2003</i>, schedule&#160;4A as in force immediately before the commencement.</txt></definition></deflist></block></subclause></clause></part></body></wrapper><schedules affected.by.uncommenced="0" numbering.style="manual"><schedule id="sch.1" guid="_672b6a51-f5bb-4737-9d3d-09bdd228c6cc" type="schedule" affected.by.uncommenced="0" spent.amends="0" numbering.style="manual" provision.type="other"><no>Schedule 1</no><heading id="sch.1-he" guid="_bc514fdd-7741-402c-80cd-b99b1380d849">Fees for allocations</heading><sourceref id="sch.1-ref" guid="_6b6571f3-368f-4a01-b9ba-e5b5613c07a9" affected.by.uncommenced="0"><intref refid="sec.8" target.guid="_5166bb47-b9f6-4f49-8725-c020cc6ba32c" check="valid">section&#160;8</intref></sourceref><block><table frame="none" colsep="0" rowsep="0" orient="port" id="sch.1-tbl" guid="_eff58be4-9488-4a3d-b3f0-15ed4cd269ba" heading.align="left" font.size="12.pt"><tgroup cols="3" colsep="0" rowsep="0" tgroupstyle="3columnUnRuled"><colspec colnum="1" colname="1" colwidth="0.331in" colsep="0"/><colspec colnum="2" colname="2" colwidth="3.890in" colsep="0"/><colspec colnum="3" colname="3" colwidth="0.779in" colsep="0"/><thead><row rowsep="0" id="sch.1-tbl-tblh-tblr" guid="_61267f60-2c71-45a8-99ed-fa0e8a37d2eb"><entry colname="1" align="left" valign="top" id="sch.1-tbl-tblh-tblr-tble1" guid="_dce96aa3-f6b1-438f-9459-60495ca0e8a0"><block><txt break.before="1"/></block></entry><entry colname="2" align="left" valign="top" id="sch.1-tbl-tblh-tblr-tble2" guid="_8f553d13-09a4-4228-b58c-3a79f8bad739"><block><txt break.before="1"/></block></entry><entry colname="3" align="center" valign="top" id="sch.1-tbl-tblh-tblr-tble3" guid="_b24179b3-b11f-4f5a-ac00-fc7d3c6aa580"><block><txt break.before="1">Fee units</txt></block></entry></row></thead><tbody><row rowsep="0" id="sch.1-tbl-tblr" guid="_03885d0b-89ae-4236-bd93-6b08eb3184e3"><entry colname="1" align="left" valign="top" id="sch.1-tbl-tblr-tble1" guid="_ddbe3974-2dfc-40b6-9cc3-572e4dc15796"><block><txt break.before="1">1</txt></block></entry><entry colname="2" align="left" valign="top" id="sch.1-tbl-tblr-tble2" guid="_3e86c1c8-f8c4-45d3-90e4-55897c21fce7"><block><txt break.before="1">Application for an allocation (Act, s&#160;73(2)(b)) allowing the removal of—</txt></block></entry><entry colname="3" align="left" valign="top" id="sch.1-tbl-tblr-tble3" guid="_a52719b8-2b24-4060-b810-144506839c91"><block><txt break.before="1"/></block></entry></row><row rowsep="0" id="sch.1-tbl-tblr-oc.2" guid="_241697d2-78ed-4ead-aa49-1a518b9bf93f"><entry colname="1" align="left" valign="top" id="sch.1-tbl-tblr-oc.2-tble1" guid="_a043bafc-14ea-43d1-9cfe-b23568737db9"><block><txt break.before="1"/></block></entry><entry colname="2" align="left" valign="top" id="sch.1-tbl-tblr-oc.2-tble2" guid="_9ea811a5-a4f7-40e1-b5e3-47f6eaaf9b35"><block><tlist number.type="default"><tli id="sch.1-tbl-tblr-oc.2-tble2-para1.a" guid="_b58b3d31-c830-4d07-8224-9efa60390705" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">not more than 10,000m<sup>3</sup> of quarry material</txt></block></tli></tlist></block></entry><entry colname="3" align="right" valign="top" id="sch.1-tbl-tblr-oc.2-tble3" guid="_3804ee1d-a36d-4c61-bb0c-71ba37959f68"><block><txt break.before="1">269.10</txt></block></entry></row><row rowsep="0" id="sch.1-tbl-tblr-oc.3" guid="_82612816-bcdc-4b28-aa31-f31a18a575fd"><entry colname="1" align="left" valign="top" id="sch.1-tbl-tblr-oc.3-tble1" guid="_069cebad-de53-4d94-bec0-96ba556df781"><block><txt break.before="1"/></block></entry><entry colname="2" align="left" valign="top" id="sch.1-tbl-tblr-oc.3-tble2" guid="_29b0407b-8161-4dfe-ad95-7e8274a0568d"><block><tlist number.type="default"><tli id="sch.1-tbl-tblr-oc.3-tble2-para1.b" guid="_02dc1342-6648-40f0-8e65-10a433b84d0d" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">more than 10,000m<sup>3</sup> of quarry material</txt></block></tli></tlist></block></entry><entry colname="3" align="right" valign="top" id="sch.1-tbl-tblr-oc.3-tble3" guid="_72cd71ad-ee7a-4a09-bbbd-bda5dabaaa00"><block><txt break.before="1">797.00</txt></block></entry></row><row rowsep="0" id="sch.1-tbl-tblr-oc.4" guid="_12f59b7d-08ce-4422-a4b4-dd5ee5b9ef3d"><entry colname="1" align="left" valign="top" id="sch.1-tbl-tblr-oc.4-tble1" guid="_eb178fdc-b000-4ce6-aa16-df17d2cc8fce"><block><txt break.before="1">2</txt></block></entry><entry colname="2" align="left" valign="top" id="sch.1-tbl-tblr-oc.4-tble2" guid="_cef5753d-c84a-4e3c-ac02-445bcbbc0ca8"><block><txt break.before="1">Application to transfer all or part of an allocation (Act, s&#160;82(2)(c)) allowing the removal of—</txt></block></entry><entry colname="3" align="left" valign="top" id="sch.1-tbl-tblr-oc.4-tble3" guid="_690a11e1-535e-47bb-953d-e36690b8c8c5"><block><txt break.before="1"/></block></entry></row><row rowsep="0" id="sch.1-tbl-tblr-oc.5" guid="_fbc160c3-e463-4d3e-ab2e-e798f8389f55"><entry colname="1" align="left" valign="top" id="sch.1-tbl-tblr-oc.5-tble1" guid="_3e69f407-09c1-4ec7-8ec6-c50389c1dbda"><block><txt break.before="1"/></block></entry><entry colname="2" align="left" valign="top" id="sch.1-tbl-tblr-oc.5-tble2" guid="_678fd460-d479-46f0-a1ef-b44d8db88bb2"><block><tlist number.type="default"><tli id="sch.1-tbl-tblr-oc.5-tble2-para1.a" guid="_4f1583ca-ab9f-417b-9f54-8fec385bc38d" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">not more than 10,000m<sup>3</sup> of quarry material</txt></block></tli></tlist></block></entry><entry colname="3" align="right" valign="top" id="sch.1-tbl-tblr-oc.5-tble3" guid="_74b29af8-0f44-4f6f-b8df-3bbcc3d16924"><block><txt break.before="1">83.90</txt></block></entry></row><row rowsep="0" id="sch.1-tbl-tblr-oc.6" guid="_22d1eef7-ea47-41a0-9945-0094d0bab613"><entry colname="1" align="left" valign="top" id="sch.1-tbl-tblr-oc.6-tble1" guid="_28dc3fe3-7589-4b0c-b76e-d812e0b7fb12"><block><txt break.before="1"/></block></entry><entry colname="2" align="left" valign="top" id="sch.1-tbl-tblr-oc.6-tble2" guid="_b631885a-0c57-4a73-b8fc-6f14d4f9311e"><block><tlist number.type="default"><tli id="sch.1-tbl-tblr-oc.6-tble2-para1.b" guid="_f9e18f95-d52b-43e3-b093-1591e7a332c7" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">more than 10,000m<sup>3</sup> of quarry material</txt></block></tli></tlist></block></entry><entry colname="3" align="right" valign="top" id="sch.1-tbl-tblr-oc.6-tble3" guid="_338763f1-10a9-4bbe-9591-f4387f39e6ee"><block><txt break.before="1">252.00</txt></block></entry></row><row rowsep="0" id="sch.1-tbl-tblr-oc.7" guid="_2e5b0e06-1682-4702-bbe9-6060590f8521"><entry colname="1" align="left" valign="top" id="sch.1-tbl-tblr-oc.7-tble1" guid="_26bdd026-9f32-49da-9e1f-b1b21a308c3c"><block><txt break.before="1">3</txt></block></entry><entry colname="2" align="left" valign="top" id="sch.1-tbl-tblr-oc.7-tble2" guid="_d6b50166-80b2-4bf5-a452-c1b72ca850cf"><block><txt break.before="1">Application to renew an allocation notice (Act, s&#160;83(2)(b)) allowing the removal of—</txt></block></entry><entry colname="3" align="left" valign="top" id="sch.1-tbl-tblr-oc.7-tble3" guid="_9dffded1-56d0-49fc-9c55-473f4a269f47"><block><txt break.before="1"/></block></entry></row><row rowsep="0" id="sch.1-tbl-tblr-oc.8" guid="_2de3e061-913a-4bf5-893f-ad4d38f5bba8"><entry colname="1" align="left" valign="top" id="sch.1-tbl-tblr-oc.8-tble1" guid="_7aca708a-e5ca-47c0-93b1-da812d674b28"><block><txt break.before="1"/></block></entry><entry colname="2" align="left" valign="top" id="sch.1-tbl-tblr-oc.8-tble2" guid="_fa2ddf28-1fe7-4481-bcd5-b1282e186a0b"><block><tlist number.type="default"><tli id="sch.1-tbl-tblr-oc.8-tble2-para1.a" guid="_f5f4edac-0001-437e-bd62-f82b1444d4d8" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">not more than 10,000m<sup>3</sup> of quarry material</txt></block></tli></tlist></block></entry><entry colname="3" align="right" valign="top" id="sch.1-tbl-tblr-oc.8-tble3" guid="_90f7420e-6a62-417e-8b53-8d0ebe9cefbf"><block><txt break.before="1">167.90</txt></block></entry></row><row rowsep="0" id="sch.1-tbl-tblr-oc.9" guid="_12410b32-c00e-439a-8a6a-25d5bb026bc7"><entry colname="1" align="left" valign="top" id="sch.1-tbl-tblr-oc.9-tble1" guid="_35652c86-2c32-4a65-80dd-7df91fe65137"><block><txt break.before="1"/></block></entry><entry colname="2" align="left" valign="top" id="sch.1-tbl-tblr-oc.9-tble2" guid="_3626ba48-1bca-4b25-bbca-c8ddbbbd604e"><block><tlist number.type="default"><tli id="sch.1-tbl-tblr-oc.9-tble2-para1.b" guid="_3924517c-e67c-475c-a0ec-a949e00f8c73" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">more than 10,000m<sup>3</sup> of quarry material</txt></block></tli></tlist></block></entry><entry colname="3" align="right" valign="top" id="sch.1-tbl-tblr-oc.9-tble3" guid="_42ee05e9-bc5a-4e53-a541-8dc42a420308"><block><txt break.before="1">505.00</txt></block></entry></row></tbody></tgroup></table></block><historynote><txt break.before="1"><b>sch&#160;1</b> sub <legref jurisd="QLD" type="act" valid.date="as.made" check="invalid">2018 SL&#160;No.&#160;40</legref> <legref jurisd="QLD" type="subordleg" valid.date="as.made" check="invalid">s 4</legref>; <legref jurisd="QLD" type="subordleg" valid.date="as.made" check="invalid">2019 SL&#160;No.&#160;93</legref> <legref jurisd="QLD" type="act" valid.date="as.made" check="invalid">s 4</legref>; <legref jurisd="QLD" type="subordleg" valid.date="as.made" check="invalid">2020 SL&#160;No.&#160;110</legref> <legref jurisd="QLD" type="act" valid.date="as.made" check="invalid">s 4</legref>; <legref jurisd="QLD" type="subordleg" valid.date="as.made" check="invalid">2021 SL&#160;No.&#160;90</legref> <legref jurisd="QLD" type="act" valid.date="as.made" check="invalid">s 4</legref>; <legref jurisd="QLD" type="subordleg" target.doc.id="sl-2022-0017" target.version.series="31fda843-cd1f-41b0-8e19-e17ec9eb126b" valid.date="as.made" check="valid">2022 SL&#160;No.&#160;17</legref> <legref jurisd="QLD" type="subordleg" refid="sec.4" target.doc.id="sl-2022-0017" target.version.series="31fda843-cd1f-41b0-8e19-e17ec9eb126b" target.guid="_abaf7846-5b65-435a-bab7-5935618ec698" valid.date="as.made" check="valid">s 4</legref></txt></historynote></schedule><schedule id="sch.2" guid="_5caf0943-b3fb-458c-afcf-0cd88600f0a0" type="schedule" affected.by.uncommenced="0" spent.amends="0" numbering.style="manual" provision.type="other"><no>Schedule 2</no><heading id="sch.2-he" guid="_19e2b24d-fc5a-4ecd-8544-856e9aed3116">Royalty payable for removed quarry material</heading><sourceref id="sch.2-ref" guid="_df454280-a3eb-4bc2-982c-157f994f3b7b" affected.by.uncommenced="0"><intref refid="sec.9" target.guid="_48f63792-0602-4071-84f8-ad292690c353" check="valid">section&#160;9</intref></sourceref><block><table frame="none" colsep="0" rowsep="0" orient="port" id="sch.2-tbl" guid="_abb2d29c-9009-4132-84d6-51d7672483af" heading.align="left" font.size="12.pt"><tgroup cols="3" colsep="0" rowsep="0" tgroupstyle="3columnUnRuled"><colspec colnum="1" colname="1" colwidth="0.331in" colsep="0"/><colspec colnum="2" colname="2" colwidth="3.906in" colsep="0"/><colspec colnum="3" colname="3" colwidth="0.768in" colsep="0"/><thead><row rowsep="0" id="sch.2-tbl-tblh-tblr" guid="_7b36f8e4-a73b-45a4-abd7-e9495596a275"><entry colname="1" align="left" valign="top" id="sch.2-tbl-tblh-tblr-tble1" guid="_6b05d80d-beb7-4791-a96f-957a64f75227"><block><txt break.before="1"/></block></entry><entry colname="2" align="left" valign="top" id="sch.2-tbl-tblh-tblr-tble2" guid="_3101dd0d-2894-47e7-ab04-ab116cd37a88"><block><txt break.before="1"/></block></entry><entry colname="3" align="right" valign="top" id="sch.2-tbl-tblh-tblr-tble3" guid="_e7c6c9b9-0106-4c02-ba54-8a5719a114a3"><block><txt break.before="1">Fee units</txt></block></entry></row></thead><tbody><row rowsep="0" id="sch.2-tbl-tblr" guid="_12619383-cd0d-4e54-91df-2813b6a802b7"><entry colname="1" align="left" valign="top" id="sch.2-tbl-tblr-tble1" guid="_84041918-53c6-444e-bccb-2af9380a58ae"><block><txt break.before="1">1</txt></block></entry><entry colname="2" align="left" valign="top" id="sch.2-tbl-tblr-tble2" guid="_89ef3433-089e-4df9-a0ad-964935c24a84"><block align="justify"><txt break.before="1">Royalty for each cubic metre of quarry material removed under an allocation notice (Act, s 102(1))—</txt></block></entry><entry colname="3" align="left" valign="bottom" id="sch.2-tbl-tblr-tble3" guid="_66f0b4f3-aedf-4b29-a3dc-04a7ad45e0fb"><block><txt break.before="1"/></block></entry></row><row rowsep="0" id="sch.2-tbl-tblr-oc.2" guid="_18ed3dee-7fef-4b9f-aeb4-db5dbb39135d"><entry colname="1" align="left" valign="top" id="sch.2-tbl-tblr-oc.2-tble1" guid="_2fcf62fd-8145-4316-81fd-288a41234cec"><block><txt break.before="1"/></block></entry><entry colname="2" align="left" valign="top" id="sch.2-tbl-tblr-oc.2-tble2" guid="_d8db7bb1-3c84-42cc-9493-b99a0ff28741"><block><tlist number.type="default"><tli id="sch.2-tbl-tblr-oc.2-tble2-para1.a" guid="_2f979526-11cf-4680-b468-631b471cdb06" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">by a government entity or a local government for its own use</txt></block></tli></tlist></block></entry><entry colname="3" align="right" valign="bottom" id="sch.2-tbl-tblr-oc.2-tble3" guid="_031355ab-5073-47ee-8b5a-3c454d4839cc"><block><txt break.before="1">0.77</txt></block></entry></row><row rowsep="0" id="sch.2-tbl-tblr-oc.3" guid="_fb0bed10-94ec-44c9-a6b8-b1f70fefc2c2"><entry colname="1" align="left" valign="top" id="sch.2-tbl-tblr-oc.3-tble1" guid="_6fa5e2bd-a6d2-45d4-b779-68716699067e"><block><txt break.before="1"/></block></entry><entry colname="2" align="left" valign="top" id="sch.2-tbl-tblr-oc.3-tble2" guid="_c5e2b3f5-7103-40e2-a5bd-a1aaf6ad93dc"><block><tlist number.type="default"><tli id="sch.2-tbl-tblr-oc.3-tble2-para1.b" guid="_28461467-ed2e-4672-aa12-955c8230d25b" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">otherwise</txt></block></tli></tlist></block></entry><entry colname="3" align="right" valign="top" id="sch.2-tbl-tblr-oc.3-tble3" guid="_5f7c6151-8265-4b76-bb01-e54570fb3e38"><block><txt break.before="1">2.27</txt></block></entry></row></tbody></tgroup></table></block><historynote><txt break.before="1"><b>sch&#160;2</b> sub <legref jurisd="QLD" type="act" valid.date="as.made" check="invalid">2018 SL&#160;No.&#160;40</legref> <legref jurisd="QLD" type="subordleg" valid.date="as.made" check="invalid">s 5</legref>; <legref jurisd="QLD" type="subordleg" valid.date="as.made" check="invalid">2019 SL&#160;No.&#160;93</legref> <legref jurisd="QLD" type="act" valid.date="as.made" check="invalid">s 5</legref>; <legref jurisd="QLD" type="subordleg" valid.date="as.made" check="invalid">2020 SL&#160;No.&#160;110</legref> <legref jurisd="QLD" type="act" valid.date="as.made" check="invalid">s 5</legref>; <legref jurisd="QLD" type="subordleg" valid.date="as.made" check="invalid">2021 SL&#160;No.&#160;90</legref> <legref jurisd="QLD" type="act" valid.date="as.made" check="invalid">s 4</legref>; <legref jurisd="QLD" type="subordleg" target.doc.id="sl-2022-0017" target.version.series="31fda843-cd1f-41b0-8e19-e17ec9eb126b" valid.date="as.made" check="valid">2022 SL&#160;No.&#160;17</legref> <legref jurisd="QLD" type="subordleg" refid="sec.4" target.doc.id="sl-2022-0017" target.version.series="31fda843-cd1f-41b0-8e19-e17ec9eb126b" target.guid="_abaf7846-5b65-435a-bab7-5935618ec698" valid.date="as.made" check="valid">s 4</legref></txt></historynote></schedule><schedule id="sch.3" guid="_6c4de702-c4d8-4eb7-b318-80d1200dd180" type="schedule" affected.by.uncommenced="0" spent.amends="0" numbering.style="manual" provision.type="other"><no>Schedule 3</no><heading id="sch.3-he" guid="_8cf1c482-6af7-417b-83c8-b9866eab637b">Code for assessable development that is prescribed tidal works</heading><sourceref id="sch.3-ref" guid="_422b0cc1-07ac-4d40-923a-c0fa88c40424" affected.by.uncommenced="0"><intref refid="sec.13" target.guid="_a45fd576-ccd9-4683-87bc-9f326be10108" check="valid">section&#160;13</intref></sourceref><part id="sch.3-pt.1" guid="_f5efe12d-1577-4912-8c8c-8014e0f777a0" affected.by.uncommenced="0"><no>Part 1</no><heading id="sch.3-pt.1-he" guid="_647d07a9-2121-40b4-a836-069ec5581a31">Preliminary</heading><clause id="sch.3-sec.1" guid="_4acfe717-d199-46f7-8e53-c79df509e0ac" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>1</no><heading id="sch.3-sec.1-he" guid="_b5e583f8-be7e-48cd-89a7-acee47023884">Purpose of code</heading><block><txt break.before="1">The purpose of this code is to ensure prescribed tidal works—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.3-sec.1-para1.a" guid="_e5093e9d-6fd8-488d-9b0d-a8c2c802f2d8" provision.type="other" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="0">are compatible with the character and amenity of their surrounding area; and</txt></block></li><li id="sch.3-sec.1-para1.b" guid="_2d26c1b1-9e66-431e-b257-8f93a73bbb12" provision.type="other" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="0">are designed and constructed in a way to ensure they are structurally sound; and</txt></block></li><li id="sch.3-sec.1-para1.c" guid="_a0b91321-a73d-49d2-919c-ddd9768d236f" provision.type="other" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="0">are safe for their intended use; and</txt></block></li><li id="sch.3-sec.1-para1.d" guid="_d713268c-9f79-4745-a809-781dfd6468d3" provision.type="other" affected.by.uncommenced="0"><no>(d)</no><block><txt break.before="0">are adequately serviced with infrastructure, including, for example, infrastructure for the supply of water or the discharge of sewage; and</txt></block></li><li id="sch.3-sec.1-para1.e" guid="_c2c81a55-8470-4ca5-a518-6d40e269f379" provision.type="other" affected.by.uncommenced="0"><no>(e)</no><block><txt break.before="0">involve only minimal use of State tidal land for a private purpose; and</txt></block></li><li id="sch.3-sec.1-para1.f" guid="_4b78c1ff-812e-4efb-811e-83f0b5546f6e" provision.type="other" affected.by.uncommenced="0"><no>(f)</no><block><txt break.before="0">do<strike/> not cause a significant adverse effect to any of the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.3-sec.1-para1.f-para2.i" guid="_fe4a1c3e-2afd-4bbd-8e13-83ee79bbfba9" provision.type="other" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="0">existing public use of, and access to, State tidal land or tidal water;</txt></block></li><li id="sch.3-sec.1-para1.f-para2.ii" guid="_f6b82092-ae3c-41ab-8df6-08a46593f267" provision.type="other" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="0">navigable access to, or navigable egress from, any lot that adjoins, or is in the immediate surroundings of, a lot connected to prescribed tidal works;</txt></block></li><li id="sch.3-sec.1-para1.f-para2.iii" guid="_93f2476d-3255-492e-9977-c80151d0e60d" provision.type="other" affected.by.uncommenced="0"><no>(iii)</no><block><txt break.before="0">the natural features of tidal water, including, for example, the water quality and bed and banks of the tidal water;</txt></block></li><li id="sch.3-sec.1-para1.f-para2.iv" guid="_6f6e0b83-8873-4631-91e8-cb8a5c2fe3b0" provision.type="other" affected.by.uncommenced="0"><no>(iv)</no><block><txt break.before="0">the structural integrity, operation or maintenance of any existing structure.</txt></block></li></list></block></li></list></block></clause><clause id="sch.3-sec.2" guid="_69a85c5c-7665-4567-994a-420e236506f6" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>2</no><heading id="sch.3-sec.2-he" guid="_a36b757b-66cc-4d54-9cd5-41327e040a5a">Definitions</heading><block><txt break.before="1">In this code—</txt><deflist><definition id="sch.3-sec.2-def.acceptableoutcome_" guid="_d225abcf-c20c-4c14-83b9-e4ca1b7402ed" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.acceptableoutcome" guid="_cd98dc9d-dd2c-4505-8d02-5f18d9953e86" type="definition">acceptable outcome</defterm>, for achieving a performance outcome stated in the table, column 1, means the acceptable outcome stated in the table, column 2 opposite the performance outcome.</txt></definition><definition id="sch.3-sec.2-def.AEP_" guid="_91699c03-ef7a-40a4-8bc6-c04a5f30399f" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.AEP" guid="_3e6841a2-2ec6-4453-9a56-bd80327f854c" type="definition">AEP</defterm> means annual exceedance probability.</txt></definition><definition id="sch.3-sec.2-def.annualexceedanceprobability_" guid="_ae0aeb2e-76ee-4dcf-bd54-dab005872004" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.annualexceedanceprobability" guid="_a519f497-c91f-404b-9597-760189ce6402" type="definition">annual exceedance probability</defterm> means the probability, expressed as a percentage, of an event exceeding a particular level or magnitude in any 1 year.</txt></definition><definition id="sch.3-sec.2-def.ASNZS11700_" guid="_f2f49a6a-2a14-4fff-bdf9-fa722c20e391" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.ASNZS11700" guid="_ceba3c42-d8fd-40a7-984c-e8a7cad28cca" type="definition">AS/NZS 1170.0</defterm> means AS/NZS 1170.0:2002, Structural design actions, Part 0: General principles.</txt></definition><definition id="sch.3-sec.2-def.ASNZS11701_" guid="_9f3a1b1c-1972-461e-9a37-ed7ea940fe43" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.ASNZS11701" guid="_47e2baf4-e17f-4a6d-bec9-a5cf3fcc3e58" type="definition">AS/NZS 1170.1</defterm> means AS/NZS 1170.1:2002 (R2016), Structural design actions, <extref type="standard">Part&#160;1</extref>: Permanent, imposed and other actions.</txt></definition><definition id="sch.3-sec.2-def.ASNZS11702_" guid="_57c27e6a-450d-47aa-b904-0e3c4d12cc05" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.ASNZS11702" guid="_be6679e4-78fc-41c1-a21b-5d841a4acf04" type="definition">AS/NZS 1170.2</defterm> means AS/NZS 1170.2:2011 (R2016), Structural design actions, <extref type="standard">Part&#160;2</extref>: Wind actions.</txt></definition><definition id="sch.3-sec.2-def.AS11704_" guid="_a630f0af-d8d1-4709-b506-86e9ab306c1c" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.AS11704" guid="_9a58a2da-eb00-48d5-8fa9-f802121aa128" type="definition">AS 1170.4</defterm> means AS 1170.4—2007, Structural design actions, <extref type="standard">Part&#160;4</extref>: Earthquake actions in Australia.</txt></definition><definition id="sch.3-sec.2-def.AS2758_" guid="_e6be5c90-92f6-4a7a-953a-ee067f5d05f2" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.AS2758" guid="_e7d408db-12b9-4416-85f8-70778e96df66" type="definition">AS 2758</defterm> means AS 2758, Aggregates and rock for engineering purposes (series).</txt></definition><definition id="sch.3-sec.2-def.ASNZS2885_" guid="_34caed0d-65bb-454c-b043-0df107ce2e3c" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.ASNZS2885" guid="_8c320b4b-2f29-409a-b96c-2868d8b6df1e" type="definition">AS/NZS 2885</defterm> means AS/NZS 2885.4:2016, Pipelines—Gas and liquid petroleum, <extref type="standard">Part&#160;4</extref>: Submarine pipeline systems.</txt></definition><definition id="sch.3-sec.2-def.AS3962_" guid="_b1e8c3a0-ce3e-4227-bf69-9aff09c72dfa" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.AS3962" guid="_9bbef114-8bd0-42a8-a9f4-455c4801f6b5" type="definition">AS 3962</defterm> means AS 3962—2001, Guidelines for design of marinas.</txt></definition><definition id="sch.3-sec.2-def.AS4678_" guid="_608157b9-f472-4abf-8318-ec8204999687" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.AS4678" guid="_ffdccc03-980a-4cb9-8860-160bc2335042" type="definition">AS 4678</defterm> means AS 4678—2002, Earth-retaining structures.</txt></definition><definition id="sch.3-sec.2-def.AS4997_" guid="_563a0473-3f73-4bf8-92a1-3e6ac89b4727" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.AS4997" guid="_5d164b12-85b7-4bfe-b6f1-25adfe824a55" type="definition">AS 4997</defterm> means AS 4997—2005, Guidelines for the design of maritime structures.</txt></definition><definition id="sch.3-sec.2-def.AustralianStandard_" guid="_17a357b0-a089-4b9f-b464-cad2833e3e2f" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.AustralianStandard" guid="_47d89712-b949-4f66-90c2-ae0961ed8755" type="definition">Australian Standard</defterm> includes a standard jointly made or published by Standards Australia and Standards New Zealand.</txt></definition><definition id="sch.3-sec.2-def.deadload_" guid="_fdada0f4-7593-4d53-b870-903b9245acba" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.deadload" guid="_d68f8830-b0e3-4882-bfdc-e643619f7ff7" type="definition">dead load</defterm>, of prescribed tidal works, means the total load applied to the works by—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.3-sec.2-def.deadload-para1.a" guid="_927bbc1b-be33-44f0-be8e-2f9b90473301" provision.type="other" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="0">the structural components of the works; and</txt></block></li><li id="sch.3-sec.2-def.deadload-para1.b" guid="_638308df-ca0f-4bb9-bc64-426a1356c4da" provision.type="other" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="0">anything permanently on or attached to the works, including, for example, a partition or machinery permanently attached to the works.</txt></block></li></list></definition><definition id="sch.3-sec.2-def.extendedsideboundary_" guid="_0c6b8c2e-6ef2-4587-8ed0-061c4555f519" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.extendedsideboundary" guid="_9246b7dc-3445-41c8-80ea-1ae224c07f43" type="definition">extended side boundary</defterm>, of a lot connected to prescribed tidal works, means a notional boundary worked out by extending a side boundary of the lot into tidal water—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.3-sec.2-def.extendedsideboundary-para1.a" guid="_ef73288b-9795-4256-82d3-00063a2e31b6" provision.type="other" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="0">in a continuing straight line; or</txt></block></li><li id="sch.3-sec.2-def.extendedsideboundary-para1.b" guid="_83f370ae-7907-47c6-a3ff-071865e05238" provision.type="other" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="0">if extending the side boundary into tidal water in a continuing straight line would reduce the width of navigable access to, or egress from, an adjoining lot to less than 3m or cause a significant adverse effect to navigational safety—at an angle that ensures—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.3-sec.2-def.extendedsideboundary-para1.b-para2.i" guid="_8e455a01-eaaf-490b-bb27-168088c314cd" provision.type="other" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="0">the width of navigable access to, or egress from, any adjoining lot is not reduced to less than 3m; and</txt></block></li><li id="sch.3-sec.2-def.extendedsideboundary-para1.b-para2.ii" guid="_c5ab5682-4122-4137-b5a2-23bebd0ec34a" provision.type="other" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="0">no significant adverse effect is caused to navigational safety.</txt></block></li></list></block></li></list></definition><definition id="sch.3-sec.2-def.foundationsupport_" guid="_4d82aaf1-c668-4bf2-a6e7-97e9fb24534c" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.foundationsupport" guid="_22c9c1f1-fca5-4843-815a-9de21cc31e58" type="definition">foundation support</defterm>, for a bridge, means anything that can be used to support the bridge, including, for example, an anchor, footing or pile.</txt></definition><definition id="sch.3-sec.2-def.highestastronomicaltide_" guid="_4a8f9cf0-b0f5-4647-8857-03441dba6e11" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.highestastronomicaltide" guid="_7690805d-b1f8-453c-ae63-78adcaf3dd0c" type="definition">highest astronomical tide</defterm> means the highest level of the tides that can be predicted to occur under average meteorological conditions and under any combination of astronomical conditions.</txt></definition><definition id="sch.3-sec.2-def.lightingstandard_" guid="_daea3c86-ee9e-4bb1-a029-3fbe6dec7330" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.lightingstandard" guid="_58c674d1-910f-48ff-a93e-05ec62607647" type="definition">lighting standard</defterm> means each of the following Australian Standards—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.3-sec.2-def.lightingstandard-para1.a" guid="_f9c96ba8-b3ab-4c75-bdad-c504a642bb47" provision.type="other" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="0">SA/SNZ TS 1158.6:2015, Lighting for roads and public spaces, <extref type="standard">Part&#160;6</extref>: Luminaires—Performance;</txt></block></li><li id="sch.3-sec.2-def.lightingstandard-para1.b" guid="_d561ddbf-9699-45ed-89e2-2bf9a12ba38e" provision.type="other" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="0">AS/NZS 1158.3.1:2005, Lighting for roads and public spaces, <extref type="standard">Part&#160;3.1</extref>: Pedestrian area (category P) lighting—Performance and design requirements;</txt></block></li><li id="sch.3-sec.2-def.lightingstandard-para1.c" guid="_ea98faf2-ba88-46c8-8516-f2baea81d410" provision.type="other" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="0">AS 4282—1997, Control of the obtrusive effects of outdoor lighting.</txt></block></li></list></definition><definition id="sch.3-sec.2-def.liveload_" guid="_cb4dbc1e-7126-48c5-b4ff-19cbc9044028" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.liveload" guid="_01a634a4-2bb6-4b3a-8511-f1b345e32521" type="definition">live load</defterm>, in relation to prescribed tidal works, means the total load applied to the works by anything temporarily on or attached to the works.</txt></definition><definition id="sch.3-sec.2-def.load_" guid="_660833af-60c6-4679-ae3c-d86f0de71414" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.load" guid="_b6e4a7bb-e6d1-4701-93b4-21e65da5a586" type="definition">load</defterm> means weight, force or pressure.</txt></definition><definition id="sch.3-sec.2-def.lot_" guid="_bd59d870-8f2b-446a-8486-8337d17f216c" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.lot" guid="_a4132215-e958-4da7-9ce0-f2de71e3a4b0" type="definition">lot</defterm> includes a parcel of unallocated State land.</txt></definition><definition id="sch.3-sec.2-def.marineplant_" guid="_21a4f4cd-e2f1-4699-96e3-57c7ef8e4bb4" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.marineplant" guid="_d26d26bd-c48b-4f4c-97a3-3e93645d7e6c" type="definition">marine plant</defterm> see the <legref jurisd="QLD" type="act" target.doc.id="act-1994-037" target.version.series="d7ebcb19-f312-46a5-9a6f-59793df30f39" check="valid"><name emphasis="yes">Fisheries Act 1994</name></legref>, <legref jurisd="QLD" type="act" refid="sec.8" target.doc.id="act-1994-037" target.version.series="d7ebcb19-f312-46a5-9a6f-59793df30f39" target.guid="_a5b1ae27-d212-4d08-8726-0f3c1d14e189" check="valid">section&#160;8</legref>.</txt></definition><definition id="sch.3-sec.2-def.nonprivatepurpose_" guid="_de63976b-b6bc-4dbf-8a11-5ab211d0f016" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.nonprivatepurpose" guid="_4e00e309-e4ea-447f-9756-4502100fd3a0" type="definition">non-private purpose</defterm> means a purpose other than a private purpose.</txt></definition><definition id="sch.3-sec.2-def.performanceoutcome_" guid="_3668a0f8-d415-487a-a1d2-0ebc200dfc1a" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.performanceoutcome" guid="_740a3ef4-d946-4920-9404-37cc42e552cc" type="definition">performance outcome</defterm> means an outcome stated in the table, column 1.</txt></definition><definition id="sch.3-sec.2-def.pontoon_" guid="_68fa0383-cb58-48f3-b601-e7ea9de5e383" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.pontoon" guid="_abe4a08b-b66c-49cb-b0d6-20f717e92b06" type="definition">pontoon</defterm> means a structure consisting of the following components—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.3-sec.2-def.pontoon-para1.a" guid="_b81ff2c4-ca8d-4021-965f-a23fe81e7451" provision.type="other" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="0">a flotation unit;</txt></block></li><li id="sch.3-sec.2-def.pontoon-para1.b" guid="_7928ec35-5335-4ca4-8303-487562cace35" provision.type="other" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="0">an access walkway for the flotation unit;</txt></block></li><li id="sch.3-sec.2-def.pontoon-para1.c" guid="_ee23a811-ae50-4e5a-9a1e-a6064840016b" provision.type="other" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="0">a system for mooring the flotation unit and access walkway, including, for example, by way of piles or anchored cables;</txt></block></li><li id="sch.3-sec.2-def.pontoon-para1.d" guid="_2123b20a-cb8f-490e-a9f8-4c9359335724" provision.type="other" affected.by.uncommenced="0"><no>(d)</no><block><txt break.before="0">an abutment for the access walkway.</txt></block></li></list></definition><definition id="sch.3-sec.2-def.prescribeddeck_" guid="_32d077ad-8e55-4616-9678-4138af592f2a" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.prescribeddeck" guid="_b76b5ed0-d7c4-4009-93fd-9556c52ab3fc" type="definition">prescribed deck</defterm> means a structure, other than a bridge, that—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.3-sec.2-def.prescribeddeck-para1.a" guid="_122abc29-ceae-4bd7-a36d-fcd6e890e73c" provision.type="other" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="0">is connected to land; and</txt></block></li><li id="sch.3-sec.2-def.prescribeddeck-para1.b" guid="_60f22558-09ec-4a74-b6cb-9b504b5c0fb8" provision.type="other" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="0">consists primarily of a deck and components to structurally support the deck; and</txt></block></li><li id="sch.3-sec.2-def.prescribeddeck-para1.c" guid="_56c3597b-311d-43cc-90b9-34425f8dc611" provision.type="other" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="0">is not intended, or normally used, for launching, landing or mooring vessels.</txt></block></li></list><note id="sch.3-sec.2-def.prescribeddeck-note" guid="_3dbd7e0f-9e5c-4189-ba3b-a8a60d32fcdf" type="example"><heading id="sch.3-sec.2-def.prescribeddeck-note-he" guid="_0c43089e-436a-46d8-a1c4-29cdbfe3b299">Examples of a prescribed deck—</heading><block><txt break.before="1">boardwalk, viewing platform, recreational deck</txt></block></note></definition><definition id="sch.3-sec.2-def.privatepurpose_" guid="_6122348e-b61a-40a8-9fcd-f344e3be5a62" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.privatepurpose" guid="_6fc35cd7-8765-46e7-9eb4-077e70ec35c8" type="definition">private purpose</defterm>, in relation to prescribed tidal works, means a purpose—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.3-sec.2-def.privatepurpose-para1.a" guid="_582803b4-2d36-421d-bba0-80ca74aeee63" provision.type="other" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="0">related to use of the works—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.3-sec.2-def.privatepurpose-para1.a-para2.i" guid="_0d5b7aa6-4705-4e23-a4f8-f5b69f93f532" provision.type="other" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="0">for launching, landing or mooring a vessel used only for recreation; or</txt></block></li><li id="sch.3-sec.2-def.privatepurpose-para1.a-para2.ii" guid="_456eafd2-1af4-40a6-b8a9-45f7726913eb" provision.type="other" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="0">for the benefit of, or in connection with, residential property only; and</txt></block></li></list></block></li><li id="sch.3-sec.2-def.privatepurpose-para1.b" guid="_7d101c62-7f61-4ffa-bcfe-b20e3f2968d2" provision.type="other" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="0">that is not related to use of the works for the benefit of, or in connection with, a commercial activity or public use.</txt></block></li></list></definition><definition id="sch.3-sec.2-def.projectedsealevelrise_" guid="_999fd08a-f0e8-41f2-ac9b-57e33142021e" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.projectedsealevelrise" guid="_12a321e3-b3e1-4702-9b80-944edcff88fe" type="definition">projected sea level rise</defterm> means an increase in sea level projected to be 0.8m by 2100.</txt></definition><definition id="sch.3-sec.2-def.relevantloadingmatter_" guid="_6adeba24-7805-4535-b9b5-1f7c8487642f" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.relevantloadingmatter" guid="_ded41a04-fe07-4f60-ad17-82977321cacb" type="definition">relevant loading matter</defterm>, for prescribed tidal works, means each of the following matters, to the extent they affect the load that can be reasonably expected to be applied to the works at any given time—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.3-sec.2-def.relevantloadingmatter-para1.a" guid="_baff0ff2-32e1-464f-810d-29979dac31b4" provision.type="other" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="0">the purpose or activity for which the works are intended to be used;</txt></block></li><li id="sch.3-sec.2-def.relevantloadingmatter-para1.b" guid="_93fc468b-72e1-47a5-9562-977da29bb481" provision.type="other" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="0">the dead load of the works;</txt></block></li><li id="sch.3-sec.2-def.relevantloadingmatter-para1.c" guid="_73dc6277-3e8c-48be-95fa-aa5e6291a3ba" provision.type="other" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="0">the live load of the works, including, for example—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.3-sec.2-def.relevantloadingmatter-para1.c-para2.i" guid="_1597f346-ffc6-4372-8930-4ed59fda6e44" provision.type="other" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="0">the maximum number of people likely to use the works at any given time; and</txt></block></li><li id="sch.3-sec.2-def.relevantloadingmatter-para1.c-para2.ii" guid="_ae38b1f8-3868-4260-a642-3abc17b2952d" provision.type="other" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="0">the maximum number and types of vehicles likely to be on or moored at the works at any given time;</txt></block></li></list></block></li><li id="sch.3-sec.2-def.relevantloadingmatter-para1.d" guid="_3fc6f36f-adee-46b3-ac40-0a426660ea7e" provision.type="other" affected.by.uncommenced="0"><no>(d)</no><block><txt break.before="0">the height or velocity of waves likely to occur in the tidal water under, within or over which the works are located;</txt></block></li><li id="sch.3-sec.2-def.relevantloadingmatter-para1.e" guid="_c79c7394-63a8-4eee-ab25-68e3e48786f6" provision.type="other" affected.by.uncommenced="0"><no>(e)</no><block><txt break.before="0">any other thing that may be relevant to the load applied to the works at any given time, including, for example, environmental factors.</txt></block></li></list></definition><definition id="sch.3-sec.2-def.relevantplanningscheme_" guid="_12cc43a0-cc76-455c-94c5-3c49209da81d" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.relevantplanningscheme" guid="_63cf2eab-7069-4e8a-b479-8a5a0c54a92a" type="definition">relevant planning scheme</defterm>, for prescribed tidal works, means the local government planning scheme applying to the lot connected to the works.</txt></definition><definition id="sch.3-sec.2-def.relevantplanningschemestandard_" guid="_80844bb3-a479-4290-a477-356fcee9d476" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.relevantplanningschemestandard" guid="_36e5343d-ceec-4aea-acb7-3d2824e9b6c8" type="definition">relevant planning scheme standard</defterm>, in relation to achieving a performance outcome for prescribed tidal works, means a standard—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.3-sec.2-def.relevantplanningschemestandard-para1.a" guid="_d04a43ea-3aa4-4c35-b526-bd5a13006e2f" provision.type="other" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="0">stated in the relevant planning scheme for the works; and</txt></block></li><li id="sch.3-sec.2-def.relevantplanningschemestandard-para1.b" guid="_27815920-930f-4766-b073-8e476443a48f" provision.type="other" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="0">relevant to achieving the performance outcome.</txt></block></li></list></definition><definition id="sch.3-sec.2-def.revetment_" guid="_0c14b872-d212-4a55-a55e-c43f31e55e12" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.revetment" guid="_d47bdc2a-9520-47f3-840a-e7e5777b73f1" type="definition">revetment</defterm> means a wall constructed along the bottom of an embankment to—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.3-sec.2-def.revetment-para1.a" guid="_3949c6ac-e1d4-48d7-b597-0d1382f90b6e" provision.type="other" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="0">protect the embankment from erosion; and</txt></block></li><li id="sch.3-sec.2-def.revetment-para1.b" guid="_f6ccce4c-1305-4623-9096-c127b390cabf" provision.type="other" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="0">keep in place the earth or other materials that are landward of the wall.</txt></block></li></list></definition><definition id="sch.3-sec.2-def.roofed_" guid="_69a1e0c7-3719-4587-a172-56e0d860e955" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.roofed" guid="_31716c38-0ee2-4525-8a95-af13fb2c0d5b" type="definition">roofed</defterm> means covered with a permanent or temporary attachment.</txt><note id="sch.3-sec.2-def.roofed-note" guid="_22bc0853-7955-4f98-abf5-90928a1575ba" type="example"><heading id="sch.3-sec.2-def.roofed-note-he" guid="_b2e9f791-e1d3-40fd-b9d2-4f3233eab904">Example of temporary attachment—</heading><block><txt break.before="1">detachable wind sail</txt></block></note></definition><definition id="sch.3-sec.2-def.s52outcome_" guid="_86b3ccc0-9321-499a-80f0-3c4e543c9ef4" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.s52outcome" guid="_03e6d561-92d1-4775-bc66-a3153900ab09" type="definition">s 5(2) outcome</defterm> see <intref refid="sch.3-sec.4" target.guid="_0eeacbc9-8231-43c4-bca8-bdba7c515080" check="valid">section&#160;4</intref> of this code.</txt></definition><definition id="sch.3-sec.2-def.seawall_" guid="_0ac7c249-8402-4fd0-9528-46f67caeab04" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.seawall" guid="_4d354c5c-9174-41ee-b2f4-f3c6d7605106" type="definition">seawall</defterm> means a wall constructed along a shoreline to—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.3-sec.2-def.seawall-para1.a" guid="_80560a48-9186-45d5-86df-8b5dd374802f" provision.type="other" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="0">prevent the encroachment, by wave action, of the sea past the shoreline; and</txt></block></li><li id="sch.3-sec.2-def.seawall-para1.b" guid="_3517bfdd-fa32-411f-a12b-d4b313dcb910" provision.type="other" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="0">keep in place the earth or other materials that are landward of the wall.</txt></block></li></list></definition><definition id="sch.3-sec.2-def.sideboundary_" guid="_cfe80611-2e08-4259-9ba6-62d2caace43a" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.sideboundary" guid="_21afdd61-b355-4dba-8044-c2ce13773c82" type="definition">side boundary</defterm>, of a lot, means a boundary of the lot that meets tidal water but is not a waterfront boundary of the lot.</txt></definition><definition id="sch.3-sec.2-def.stormwateroutlet_" guid="_8731c584-c151-4625-80b0-c146613c23c6" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.stormwateroutlet" guid="_a631b4fa-c708-40d8-a265-7cbd0f4b0c39" type="definition">stormwater outlet</defterm> means a pipe or drain for the discharge of stormwater or floodwater.</txt></definition><definition id="sch.3-sec.2-def.vegetation_" guid="_d4753e9e-cc58-453e-aa9a-1f6be5720ac0" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.vegetation" guid="_865981fe-8f2d-47ab-b0d2-0dfa4317346e" type="definition">vegetation</defterm> does not include marine plants.</txt></definition><definition id="sch.3-sec.2-def.vehicle_" guid="_3895f872-0142-4cca-b692-0922d4b63a1d" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.vehicle" guid="_be3cfe7d-d8d5-4b4f-b8d6-585a9b48844e" type="definition">vehicle</defterm> includes a boat or other vessel.</txt></definition><definition id="sch.3-sec.2-def.waterallocationarea_" guid="_d9066f1f-d793-4256-9208-c8db63b40543" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.waterallocationarea" guid="_2fe24989-dbdf-484a-b6c5-b41c9c89a343" type="definition">water allocation area</defterm>, for a lot, means an area of State tidal land designated by the State, a local government or the Gold Coast Waterways Authority as an area in relation to which a development application for prescribed tidal works connected to the lot may be made.</txt></definition><definition id="sch.3-sec.2-def.waterfrontboundary_" guid="_6cdc750e-dd0f-40ed-bb47-0ed610278c21" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.2-def.waterfrontboundary" guid="_f3fdab3b-c2eb-49cf-a3ef-a512ad18cd90" type="definition">waterfront boundary</defterm>, of a lot, means a boundary of the lot fronting tidal water.</txt></definition></deflist></block></clause><clause id="sch.3-sec.3" guid="_d38029af-4935-4a2c-a4f4-1dc7fccb8756" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>3</no><heading id="sch.3-sec.3-he" guid="_c2890bf3-d262-4eb0-8b61-39722e6ec963">When lot is connected to prescribed tidal works</heading><block><txt break.before="1">For this code, a lot is connected to prescribed tidal works if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.3-sec.3-para1.a" guid="_0be98304-959e-4053-8201-f5ad23abf761" provision.type="other" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="0">the works are attached to the lot; or</txt></block></li><li id="sch.3-sec.3-para1.b" guid="_720d6ccf-4090-40d6-afc3-8ddf01216ebf" provision.type="other" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="0">the works are not attached to the lot but are constructed for use in association with the lot.</txt><note id="sch.3-sec.3-para1.b-note" guid="_6ff776c1-c080-47c8-a512-6afb85f018e2" type="example"><heading id="sch.3-sec.3-para1.b-note-he" guid="_288e211b-eab1-4381-9512-fcada7a17f5d">Example for <intref refid="sch.3-sec.3-para1.b" target.guid="_720d6ccf-4090-40d6-afc3-8ddf01216ebf" check="valid">paragraph&#160;(b)</intref>—</heading><block><txt break.before="1">a mooring pile near, but not attached to, a lot used for mooring vessels by persons who live on the lot</txt></block></note></block></li></list></block></clause><clause id="sch.3-sec.4" guid="_0eeacbc9-8231-43c4-bca8-bdba7c515080" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>4</no><heading id="sch.3-sec.4-he" guid="_4652d728-e3c9-4c46-926d-889d05902024">References to s 5(2) outcome in acceptable outcome</heading><block><txt break.before="1">In the table, a reference to the words ‘s 5(2) outcome’, in brackets, before an acceptable outcome is a reference to the requirement, under <intref refid="sch.3-sec.5" target.guid="_50d90ee3-221c-4799-8636-d7861acda02d" check="valid">section&#160;5</intref><intref refid="sch.3-sec.5-ssec.2" target.guid="_d1b3b83e-50d3-4bc8-9dc9-69a8fe51fbec" check="valid">(2)</intref> of this code, that the acceptable outcome must be complied with to achieve the performance outcome stated opposite the acceptable outcome.</txt></block></clause></part><part id="sch.3-pt.2" guid="_62ae43c5-bfb3-4f08-b1c8-c806f8ec6165" affected.by.uncommenced="0"><no>Part 2</no><heading id="sch.3-pt.2-he" guid="_b104eabd-4aec-450d-8aff-4d0fb04866eb">Compliance with code</heading><clause id="sch.3-sec.5" guid="_50d90ee3-221c-4799-8636-d7861acda02d" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>5</no><heading id="sch.3-sec.5-he" guid="_9f8a8620-1929-4050-809c-d3054c94fa6b">How to comply with code</heading><subclause id="sch.3-sec.5-ssec.1" guid="_c0b8eb53-b999-42d3-af3e-bbf195c91a22" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This code is complied with for prescribed tidal works if each performance outcome applying to the works is achieved.</txt></block></subclause><subclause id="sch.3-sec.5-ssec.2" guid="_d1b3b83e-50d3-4bc8-9dc9-69a8fe51fbec" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">A performance outcome mentioned in item 12.10, 13.1, 13.2, 15.1, 15.2, 16.1, 16.3, 17.1, 18.1, 18.2, 18.3, 18.6, 19.1, 19.2, 19.3 or 20.1 of the table is achieved only if the acceptable outcome for the item is complied with.</txt></block></subclause><subclause id="sch.3-sec.5-ssec.3" guid="_e562c8e8-2263-47d7-bbe2-8a51c5f38230" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, a performance outcome mentioned in any of items 12.1 to 12.10, 13.1, 13.2, 14.1, 14.2, 15.1 to 15.3, 16.1 to 16.3, 17.1, 18.1 to 18.4, 18.6, 19.1 to 19.4 and 20.1 of the table is achieved only if the works carried out to comply with the acceptable outcome for the item for achieving the outcome are appropriately certified.</txt></block></subclause><subclause id="sch.3-sec.5-ssec.4" guid="_629f4caf-435a-40ea-9256-19f83e29599c" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">An acceptable outcome, other than an acceptable outcome mentioned in <intref refid="sch.3-sec.5-ssec.2" target.guid="_d1b3b83e-50d3-4bc8-9dc9-69a8fe51fbec" check="valid">subsection&#160;(2)</intref>, stated for a performance outcome provides a guide for how the performance outcome may be achieved.</txt></block></subclause><subclause id="sch.3-sec.5-ssec.5" guid="_511d6cad-11dc-4123-91d3-1d733997dbd0" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sch.3-sec.5-ssec.5-def.appropriatelycertified_" guid="_1fe5f093-10b5-45a8-8d17-3a46a647cadc" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.5-ssec.5-def.appropriatelycertified" guid="_6953320d-6199-45e5-8e9b-98566917b4c3" type="definition">appropriately certified</defterm>, for tidal works carried out to comply with an acceptable outcome for achieving a performance outcome, means the tidal works have been certified by a relevant engineer as having been designed and constructed to achieve the outcome.</txt></definition><definition id="sch.3-sec.5-ssec.5-def.relevantengineer_" guid="_5b18257f-ae4d-4457-8d4d-a153853dd8f2" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.5-ssec.5-def.relevantengineer" guid="_ea1eaabc-175c-4dde-bc92-df965cce437f" type="definition">relevant engineer</defterm> means a person who, under the <legref jurisd="QLD" type="act" target.doc.id="act-2002-054" target.version.series="b7cf8aa4-8814-465b-ac45-cfbd6a158a10" check="valid"><name emphasis="yes">Professional Engineers Act 2002</name></legref>, is a registered professional engineer in any of the following areas of engineering—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.3-sec.5-ssec.5-def.relevantengineer-para1.a" guid="_9b7e0815-fa2c-4b7d-ac06-40d10688a026" provision.type="other" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="0">civil engineering;</txt></block></li><li id="sch.3-sec.5-ssec.5-def.relevantengineer-para1.b" guid="_533ce350-986a-4ada-b595-23fcc97699a0" provision.type="other" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="0">environmental engineering;</txt></block></li><li id="sch.3-sec.5-ssec.5-def.relevantengineer-para1.c" guid="_99f7c383-a41a-4b1d-8d6a-1fcf45e9c6c3" provision.type="other" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="0">geotechnical engineering;</txt></block></li><li id="sch.3-sec.5-ssec.5-def.relevantengineer-para1.d" guid="_d98e8141-689a-409f-9f65-23dfebeacb3e" provision.type="other" affected.by.uncommenced="0"><no>(d)</no><block><txt break.before="0">structural engineering.</txt></block></li></list></definition></deflist></block></subclause></clause><clause id="sch.3-sec.6" guid="_f4af0f67-fcda-42dd-a526-32df4fdb4b9e" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>6</no><heading id="sch.3-sec.6-he" guid="_780b617c-5681-49d2-90ed-50565ffe2001">Relationship between particular performance outcomes and acceptable outcomes</heading><subclause id="sch.3-sec.6-ssec.1" guid="_1da09b3b-6d8b-47f5-81bd-8d3faeac2ecf" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if there is an inconsistency or overlap between—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.3-sec.6-ssec.1-para1.a" guid="_219caa27-10ef-43ae-a9f3-3e96128c101e" provision.type="other" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="0">a performance outcome (a <defterm id="sch.3-sec.6-ssec.1-def.generalperformanceoutcome" guid="_47796f8b-b102-471a-b9bc-461f17f778fb" type="definition">general performance outcome</defterm>) mentioned in any item in the table from item 12.1 to item 12.10, inclusive; and</txt></block></li><li id="sch.3-sec.6-ssec.1-para1.b" guid="_037a66e3-33a1-4f62-837b-6d9d6fff03f0" provision.type="other" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="0">a performance outcome (a <defterm id="sch.3-sec.6-ssec.1-def.directperformanceoutcome" guid="_fe3c9134-06c0-4a6f-ba85-251f13e14331" type="definition">direct performance outcome</defterm>) mentioned in any item in the table from item 13.1 to item 20.1, inclusive.</txt></block></li></list></block></subclause><subclause id="sch.3-sec.6-ssec.2" guid="_e8b0c0d1-0fc2-49de-95af-fdfeead782e3" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The direct performance outcome prevails to the extent of the inconsistency or overlap.</txt></block></subclause><subclause id="sch.3-sec.6-ssec.3" guid="_5468c301-47e9-486a-9791-17b551f706cd" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0"><intref refid="sch.3-sec.6-ssec.4" target.guid="_a780921c-d600-4d02-b94e-753fad4ed288" check="valid">Subsection&#160;(4)</intref> applies if the acceptable outcome for the general performance outcome includes an Australian Standard that is more stringent than a stated direct standard included in the acceptable outcome for the direct performance outcome.</txt></block></subclause><subclause id="sch.3-sec.6-ssec.4" guid="_a780921c-d600-4d02-b94e-753fad4ed288" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">The acceptable outcome for the direct performance outcome is taken to include the Australian Standard instead of the stated direct standard.</txt></block></subclause><subclause id="sch.3-sec.6-ssec.5" guid="_cad60220-9bc2-4a75-bb73-713ceecd95b3" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sch.3-sec.6-ssec.5-def.stateddirectstandard_" guid="_1eaed6a7-b122-430c-a765-983825231870" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.3-sec.6-ssec.5-def.stateddirectstandard" guid="_4ec2b0df-6042-484b-8327-0c7700d588fb" type="definition">stated direct standard</defterm>, included in the acceptable outcome for a direct performance outcome, means a standard stated in the acceptable outcome, other than a relevant planning scheme standard.</txt></definition></deflist></block></subclause></clause></part><part id="sch.3-pt.3" guid="_862f2191-2daf-4630-b7f0-5e2fcadaa478" affected.by.uncommenced="0"><no>Part 3</no><heading id="sch.3-pt.3-he" guid="_9a86bfb2-0e7d-472d-97f2-2d37656343b5">Performance outcomes and acceptable outcomes</heading><block><table frame="all" colsep="1" rowsep="1" orient="port" id="sch.3-pt.3-tbl" guid="_5d2f3920-c79f-41ab-94b6-d445858e0967" heading.align="center" font.size="12.pt"><heading id="sch.3-pt.3-tbl-he" guid="_71c971fb-a6ec-4a1a-a94b-72f6bfe4e483">Table</heading><tgroup cols="2" colsep="1" rowsep="1" tgroupstyle="Ruled4column"><colspec colnum="1" colname="1" colwidth="2.599in"/><colspec colnum="2" colname="2" colwidth="2.401in"/><thead><row rowsep="1" id="sch.3-pt.3-tbl-tblh-tblr" guid="_58d62fb8-8f0b-45e9-aff8-796167358a1e"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblh-tblr-tble1" guid="_6c951fc3-c4d6-42ed-96e4-7f4709d12b94"><block><txt break.before="1"><b>Column 1</b></txt></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblh-tblr-tble2" guid="_b1090766-8136-4031-87d8-544350134b57"><block><txt break.before="1"><b>Column 2</b></txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblh-tblr-oc.2" guid="_2ecff906-5684-4540-8a53-f2c2bac5707b"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblh-tblr-oc.2-tble1" guid="_c651db38-5475-4951-8f90-81596a34d976"><block><txt break.before="1"><b>Performance outcome</b></txt></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblh-tblr-oc.2-tble2" guid="_71292d09-50ad-4c67-9178-a10ce9b40d0d"><block><txt break.before="1">Acceptable outcome</txt></block></entry></row></thead><tbody><row rowsep="1" id="sch.3-pt.3-tbl-tblr" guid="_7c28d599-6145-48e7-97c5-6aa94b642aea"><entry namest="1" nameend="2" align="center" valign="top" id="sch.3-pt.3-tbl-tblr-tble1" guid="_f8d54833-b091-4608-97e0-2ba273e4c0d2"><block><txt break.before="1">Character and amenity (generally)—prescribed tidal works in a canal</txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.2" guid="_4e895481-0a8c-4d38-9418-f79ea57de2c8"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.2-tble1" guid="_55c05226-f81d-4862-939a-cdb86dc9cd3d"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.2-tble1-para1.1.1" guid="_96800ac9-e9f7-4a38-80f4-210cc4f6bc03" affected.by.uncommenced="0"><no>1.1</no><block><txt break.before="1">Prescribed tidal works in a canal are compatible with their location, having regard to the following—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.2-tble1-para1.1.1-para2.a" guid="_43c02aa7-7953-42a8-a3ba-9a869f66d5fd" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">the character and amenity of the works’ immediate surroundings and the locality within which the works are located;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.2-tble1-para1.1.1-para2.b" guid="_3bba8d17-aaeb-431d-af34-d90b4406306a" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">if the relevant planning scheme states the desired character or amenity for the works’ immediate surroundings or the locality within which the works are located—the stated desired character or amenity.</txt></block></tli></tlist></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.2-tble2" guid="_2f921f46-255b-4888-8e0a-21e92698b481"><block><txt break.before="1">The design and construction of the prescribed tidal works is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.2-tble2-para1.a" guid="_47981975-2d45-40cd-991a-8bb9444c217e" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.2-tble2-para1.c" target.guid="_e68c1694-3bc2-44f6-9849-c4bbb8c85eb9" check="valid">paragraph&#160;(c)</intref>, prescribed tidal works do not extend past the side boundary or extended side boundary of the lot connected to the works;</txt></block></tli></tlist><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.2-tble2-para1.b" guid="_f3e045f9-3c3e-45d5-9ecc-517985ed54be" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.2-tble2-para1.c" target.guid="_e68c1694-3bc2-44f6-9849-c4bbb8c85eb9" check="valid">paragraph&#160;(c)</intref>—</txt><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.2-tble2-para1.b-para2.i" guid="_56ce95b2-9159-4c9d-9bea-b242735bbcf5" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">for prescribed tidal works for a private purpose—the works are not roofed; or </txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.2-tble2-para1.b-para2.ii" guid="_9b8ac5e2-f8ab-42a4-b52a-58c961ce028d" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">for prescribed tidal works for a non-private purpose—the works are not roofed unless they are the main access to land;</txt></block></tli></tlist></block></tli></tlist><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.2-tble2-para1.c" guid="_e68c1694-3bc2-44f6-9849-c4bbb8c85eb9" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.2-tble2-para1.a" target.guid="_47981975-2d45-40cd-991a-8bb9444c217e" check="valid">paragraph&#160;(a)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.2-tble2-para1.b" target.guid="_f3e045f9-3c3e-45d5-9ecc-517985ed54be" check="valid">(b)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.2-tble2-para1.a" target.guid="_47981975-2d45-40cd-991a-8bb9444c217e" check="valid">paragraph&#160;(a)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.2-tble2-para1.b" target.guid="_f3e045f9-3c3e-45d5-9ecc-517985ed54be" check="valid">(b)</intref>;</txt></block></tli></tlist><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.2-tble2-para1.d" guid="_594cd2f4-714b-49e0-bf23-3b9d3527fe0b" affected.by.uncommenced="0"><no>(d)</no><block><txt break.before="1">any other relevant planning scheme standard that is not inconsistent with the standards mentioned in paragraphs (a) to (c).</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.3" guid="_ff1a7b49-9468-4d10-809c-8b117adc988c"><entry namest="1" nameend="2" align="center" valign="top" id="sch.3-pt.3-tbl-tblr-oc.3-tble1" guid="_07eeee8b-d7cb-4a8d-9f8f-e680316dc1f4"><block><txt break.before="1">Character and amenity (generally)—prescribed tidal works not in a canal</txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.4" guid="_0c10676c-ae66-4ba5-b8bd-c92a3e7fdfc7"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.4-tble1" guid="_7540b06b-db69-4586-9a5a-fc2362aefb91"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.4-tble1-para1.2.1" guid="_113fec81-8397-45f8-b22e-949559885623" affected.by.uncommenced="0"><no>2.1</no><block><txt break.before="1">Prescribed tidal works not in a canal are compatible with their location, having regard to the following—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.4-tble1-para1.2.1-para2.a" guid="_8d455b40-2ba7-498e-a9f4-9e777aa26cba" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">the character and amenity of the works’ immediate surroundings and the locality within which the works are located;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.4-tble1-para1.2.1-para2.b" guid="_a88ee29e-b133-462a-bf74-68ad09a7523c" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">if the relevant planning scheme states the desired character or amenity for the works’ immediate surroundings or the locality within which the works are located—the stated desired character or amenity.</txt></block></tli></tlist></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.4-tble2" guid="_c73e0d1f-7191-4f01-bd5a-d801d7c05a16"><block><txt break.before="1">The design and construction of the prescribed tidal works is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.4-tble2-para1.a" guid="_32f1d0ef-35cf-43fe-8c4f-02c905643573" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.4-tble2-para1.d" target.guid="_0094850c-2a67-4d6d-8ae0-505bf3f349ac" check="valid">paragraph&#160;(d)</intref>, prescribed tidal works do not extend past the side boundary or extended side boundary of the lot connected to the works;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.4-tble2-para1.b" guid="_16d8db7a-a671-47d6-b563-e7d02305c97d" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.4-tble2-para1.d" target.guid="_0094850c-2a67-4d6d-8ae0-505bf3f349ac" check="valid">paragraph&#160;(d)</intref>, prescribed tidal works are the only works of their type along the edge of the tidal water fronting the lot connected to the works;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.4-tble2-para1.c" guid="_9c0011c5-584f-4d57-9eef-e1ab18e94888" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.4-tble2-para1.d" target.guid="_0094850c-2a67-4d6d-8ae0-505bf3f349ac" check="valid">paragraph&#160;(d)</intref>—</txt><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.4-tble2-para1.c-para2.i" guid="_d6aea521-8bc0-4f6f-a375-bbe4f357d974" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">for prescribed tidal works for a private purpose—the works are not roofed; or </txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.4-tble2-para1.c-para2.ii" guid="_61d51adf-1c61-4744-a9dc-19b087e32800" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">for prescribed tidal works for a non-private purpose—the works are not roofed unless they are the main access to land;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.4-tble2-para1.d" guid="_0094850c-2a67-4d6d-8ae0-505bf3f349ac" affected.by.uncommenced="0"><no>(d)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.4-tble2-para1.a" target.guid="_32f1d0ef-35cf-43fe-8c4f-02c905643573" check="valid">paragraph&#160;(a)</intref>, <intref refid="sch.3-pt.3-tbl-tblr-oc.4-tble2-para1.b" target.guid="_16d8db7a-a671-47d6-b563-e7d02305c97d" check="valid">(b)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.4-tble2-para1.c" target.guid="_9c0011c5-584f-4d57-9eef-e1ab18e94888" check="valid">(c)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.4-tble2-para1.a" target.guid="_32f1d0ef-35cf-43fe-8c4f-02c905643573" check="valid">paragraph&#160;(a)</intref>, <intref refid="sch.3-pt.3-tbl-tblr-oc.4-tble2-para1.b" target.guid="_16d8db7a-a671-47d6-b563-e7d02305c97d" check="valid">(b)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.4-tble2-para1.c" target.guid="_9c0011c5-584f-4d57-9eef-e1ab18e94888" check="valid">(c)</intref>;</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.5" guid="_2d2fe84a-7060-4ba4-8166-3779b7265f5a"><entry colname="1" id="sch.3-pt.3-tbl-tblr-oc.5-tble1" guid="_119ade5f-ae21-4a7f-8f17-55d284442dd8"/><entry colname="2" id="sch.3-pt.3-tbl-tblr-oc.5-tble2" guid="_b73ab125-036b-43b7-907f-591928e32888"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.5-tble2-para1.e" guid="_3eddf3b6-9acd-4556-8258-36b9b88ff9c5" affected.by.uncommenced="0"><no>(e)</no><block><txt break.before="1">any other relevant planning scheme standard that is not inconsistent with the standards mentioned in paragraphs (a) to (d).</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.6" guid="_ad020ee6-51da-47e3-b94d-269c5ac08577"><entry namest="1" nameend="2" align="center" valign="top" id="sch.3-pt.3-tbl-tblr-oc.6-tble1" guid="_7ffbaea1-d635-4f7f-8cea-7e4a2c8175c0"><block><txt break.before="1">Character and amenity (height, scale and size)</txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.7" guid="_c0668118-969a-4d04-9460-a8bcffc5ff86"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.7-tble1" guid="_dd1c1b51-709d-4d05-bea1-069d0f2556cf"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.7-tble1-para1.3.1" guid="_c0c17ced-f10f-4e09-9f14-fe416fda6dcb" affected.by.uncommenced="0"><no>3.1</no><block><txt break.before="1">Prescribed tidal works are of a height, scale and size to ensure the works are compatible with the character and amenity of their location, having regard to the following—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.7-tble1-para1.3.1-para2.a" guid="_93e0de63-c6ad-4756-9d51-ea3ea0ecc264" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">the height, scale and size of the natural features of the works’ immediate surroundings and the locality within which the works are located;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.7-tble1-para1.3.1-para2.b" guid="_12fae8f8-5901-40e6-a936-a62c5b68b9e1" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">the height, scale and size of the existing buildings or other structures in the works’ immediate surroundings and the locality within which the works are located;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.7-tble1-para1.3.1-para2.c" guid="_64d5ce3b-0d10-4e31-b698-c9bbc587caac" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="1">if the relevant planning scheme states the desired height, scale or size of buildings or other structures in the works’ immediate surroundings or the locality within which the works are located—the stated desired height, scale or size.</txt></block></tli></tlist></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.7-tble2" guid="_2826fcaf-3755-413c-950a-13dc4a65b13e"><block><txt break.before="1">The height, scale and size of the prescribed tidal works is consistent with each relevant planning scheme standard.</txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.8" guid="_d9fc8626-ad43-466a-b507-841d696837f2"><entry namest="1" nameend="2" align="center" valign="top" id="sch.3-pt.3-tbl-tblr-oc.8-tble1" guid="_055d5b64-2532-4dbd-a5d7-1f3472074df5"><block><txt break.before="1">Character and amenity (materials and colours)</txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.9" guid="_f488c838-b8eb-42d9-b477-a8b510dfde23"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.9-tble1" guid="_e65e841e-dee1-44eb-9eeb-143ed64376af"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.9-tble1-para1.4.1" guid="_c9da98ef-76f5-4adc-ab58-3fed0bdc7254" affected.by.uncommenced="0"><no>4.1</no><block><txt break.before="1">The materials used for, and the colours of, prescribed tidal works are compatible with the character and amenity of the works’ location, having regard to the following—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.9-tble1-para1.4.1-para2.a" guid="_c3f4435a-18ff-4f52-a7c5-542c7860f3bf" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">the natural features of the works’ immediate surroundings and the locality within which the works are located;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.9-tble1-para1.4.1-para2.b" guid="_595f7f76-e23f-4644-9b85-e07807575836" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">the existing buildings or other structures in the works’ immediate surroundings and the locality within which the works are located;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.9-tble1-para1.4.1-para2.c" guid="_e6e4040c-0166-4854-8221-fd9bbb3495ed" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="1">if the relevant planning scheme states the desired materials to be used for, or desired colours of, buildings or other structures in the works’ immediate surroundings or the locality within which the works are located—the stated desired materials or colours.</txt></block></tli></tlist></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.9-tble2" guid="_2f4b7f37-be09-46e9-b16a-d4262171ad82"><block><txt break.before="1">The materials used for, and colours of, the prescribed tidal works are consistent with each relevant planning scheme standard.</txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.10" guid="_d94838c7-c34b-4dab-89eb-402e794bb4eb"><entry namest="1" nameend="2" align="center" valign="top" id="sch.3-pt.3-tbl-tblr-oc.10-tble1" guid="_15b6a5a8-78e5-4442-a52d-86d4fad25a9f"><block><txt break.before="1">Lighting</txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.11" guid="_2930068b-7a19-4061-aa00-020327520f50"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.11-tble1" guid="_73c430f3-2fbc-4dc5-aef0-23d11aeb4d3d"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.11-tble1-para1.5.1" guid="_2f302686-d7e2-45b3-926c-0d48418d5de3" affected.by.uncommenced="0"><no>5.1</no><block><txt break.before="1">Lighting, other than an aid to navigation, for prescribed tidal works is installed in a way to ensure the security and safe use of the works without causing significant adverse effects on the amenity of the locality within which the works are located.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.11-tble2" guid="_2a088ab4-6bfc-4f79-b3f6-59cb68d3156a"><block><txt break.before="1">The lighting for the prescribed tidal works, other than an aid to navigation, is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.11-tble2-para1.a" guid="_d73f6f3d-48b9-4b08-99a0-17e19af7c6ee" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.11-tble2-para1.c" target.guid="_e9dab7fa-b4e8-442e-ae7b-b67e646e3125" check="valid">paragraph&#160;(c)</intref>, lighting for prescribed tidal works is hooded and directed downwards;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.11-tble2-para1.b" guid="_2db764dc-da15-4fa8-a339-d560aa88bd09" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.11-tble2-para1.c" target.guid="_e9dab7fa-b4e8-442e-ae7b-b67e646e3125" check="valid">paragraph&#160;(c)</intref>, each lighting standard, to the extent relevant;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.11-tble2-para1.c" guid="_e9dab7fa-b4e8-442e-ae7b-b67e646e3125" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.11-tble2-para1.a" target.guid="_d73f6f3d-48b9-4b08-99a0-17e19af7c6ee" check="valid">paragraph&#160;(a)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.11-tble2-para1.b" target.guid="_2db764dc-da15-4fa8-a339-d560aa88bd09" check="valid">(b)</intref>—the relevant planning scheme standard, to the extent the standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.11-tble2-para1.a" target.guid="_d73f6f3d-48b9-4b08-99a0-17e19af7c6ee" check="valid">paragraph&#160;(a)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.11-tble2-para1.b" target.guid="_2db764dc-da15-4fa8-a339-d560aa88bd09" check="valid">(b)</intref>;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.11-tble2-para1.d" guid="_f8939b9b-2bcc-4f24-a0e1-c8b72961bdfa" affected.by.uncommenced="0"><no>(d)</no><block><txt break.before="1">any other relevant planning scheme standard that is not inconsistent with the standards mentioned in paragraphs (a), (b) and (c).</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.12" guid="_eb943450-e243-49c8-8b4f-d2ed4244bc71"><entry namest="1" nameend="2" align="center" valign="top" id="sch.3-pt.3-tbl-tblr-oc.12-tble1" guid="_e8ec622a-56e1-4e62-88a8-8ec836a4b5ba"><block><txt break.before="1">Signage</txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.13" guid="_75eeb246-4cd1-4f09-8efd-b0ffd4e36d1a"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.13-tble1" guid="_b2e9294c-6eed-4b55-9a1f-b311996d4432"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.13-tble1-para1.6.1" guid="_3a0ba9ae-7e99-4de6-86ab-02143f6f910f" affected.by.uncommenced="0"><no>6.1</no><block><txt break.before="1">A sign erected or otherwise placed in position for prescribed tidal works, other than a sign erected or placed for safety reasons or under an Act—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.13-tble1-para1.6.1-para2.a" guid="_1cc286e7-3cb1-4bcf-9613-b1cf148a961e" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">is compatible with the character and amenity of the works’ immediate surroundings and the locality within which the works are located; and</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.13-tble1-para1.6.1-para2.b" guid="_57a16ff3-1154-412d-83f6-0660786fc506" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">is not a dominant feature of the works, unless the dominance is for safety reasons.</txt></block></tli></tlist></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.13-tble2" guid="_090f9cba-fb8d-4c96-acaf-591d55dec280"><block><txt break.before="1">A sign erected or otherwise placed in position for prescribed tidal works, other than a sign erected or placed for safety reasons or under an Act, is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.13-tble2-para1.a" guid="_49277eaa-935f-4783-98f5-68f4c8b1cae4" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.13-tble2-para1.c" target.guid="_91cc75e1-d76b-4acd-bfa6-516f0adf98ad" check="valid">paragraph&#160;(c)</intref>, a sign erected or placed in position for identifying prescribed tidal works, or the owner of the works, is the only sign erected or placed in position for identifying the works or owner;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.13-tble2-para1.b" guid="_e0f89537-2d04-4b0e-93b6-1b84d33e7d9e" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.13-tble2-para1.c" target.guid="_91cc75e1-d76b-4acd-bfa6-516f0adf98ad" check="valid">paragraph&#160;(c)</intref>, a sign erected or otherwise placed in position for prescribed tidal works is integrated into the design and construction of the works;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.13-tble2-para1.c" guid="_91cc75e1-d76b-4acd-bfa6-516f0adf98ad" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.13-tble2-para1.a" target.guid="_49277eaa-935f-4783-98f5-68f4c8b1cae4" check="valid">paragraph&#160;(a)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.13-tble2-para1.b" target.guid="_e0f89537-2d04-4b0e-93b6-1b84d33e7d9e" check="valid">(b)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.13-tble2-para1.a" target.guid="_49277eaa-935f-4783-98f5-68f4c8b1cae4" check="valid">paragraph&#160;(a)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.13-tble2-para1.b" target.guid="_e0f89537-2d04-4b0e-93b6-1b84d33e7d9e" check="valid">(b)</intref>;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.13-tble2-para1.d" guid="_1903f8a6-70bb-4849-a205-297321e337d0" affected.by.uncommenced="0"><no>(d)</no><block><txt break.before="1">any other relevant planning scheme standard that is not inconsistent with the standards mentioned in paragraphs (a), (b) and (c).</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.14" guid="_2c787562-0998-41cf-8e27-040b8576a4d0"><entry namest="1" nameend="2" align="center" valign="top" id="sch.3-pt.3-tbl-tblr-oc.14-tble1" guid="_aad399ff-ac5e-403b-9de5-236cdd13dd3a"><block><txt break.before="1">Earthwork, vegetation and rehabilitation</txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.15" guid="_9a0c9d0b-e8d7-403e-89e2-70465c7398e4"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.15-tble1" guid="_93943c9f-5dfc-4df0-b880-7559a33e758c"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.15-tble1-para1.7.1" guid="_449798d5-641a-44b2-b33d-b97717e92764" affected.by.uncommenced="0"><no>7.1</no><block><txt break.before="1">Excavation and filling for prescribed tidal works—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.15-tble1-para1.7.1-para2.a" guid="_08dc32e9-8435-43f8-af7c-b3496cbbe657" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">is carried out only to the extent reasonably necessary for the works; and</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.15-tble1-para1.7.1-para2.b" guid="_42799ff8-f8bd-4b47-b81d-3f6233ea56c1" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">does not have a significant adverse effect on—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.15-tble1-para1.7.1-para2.b-para3.i" guid="_b264e8eb-ddc4-48b1-913a-ef525bd56c86" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">the natural features, including the banks, of the tidal water in the works’ immediate surroundings; or</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.15-tble1-para1.7.1-para2.b-para3.ii" guid="_40aac469-6077-48fe-a605-5392a6153973" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">the level of the surface of the land under the tidal water in the works’ immediate surroundings or any foreshore near the works.</txt></block></tli></tlist></block></tli></tlist></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.15-tble2" guid="_d9d14dc3-4bc8-4e77-8371-cf3585fcb85d"><block><txt break.before="1">The earthwork and filling for the prescribed tidal works is consistent with each relevant planning scheme standard.</txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.16" guid="_66fc06f7-8f8a-41e1-98a4-2f8fca8dca56"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.16-tble1" guid="_91d484a8-2b12-4f00-b73e-143fd8ac7133"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.16-tble1-para1.7.2" guid="_a94bce9e-c67a-4fe2-9548-7961faa230c0" affected.by.uncommenced="0"><no>7.2</no><block><txt break.before="1">The location and construction of prescribed tidal works ensures vegetation is cleared or disturbed only to the extent reasonably necessary for the works.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.16-tble2" guid="_6d7baade-9d6e-461c-890d-d213cfd7cb08"><block><txt break.before="1">Vegetation on land affected by the prescribed tidal works is dealt with in a way consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.16-tble2-para1.a" guid="_02a1fa63-0fae-4925-8bb9-cd33e8616d0e" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.16-tble2-para1.b" target.guid="_6c84cde4-b8a8-4ecd-8e93-7364cd587822" check="valid">paragraph&#160;(b)</intref>, the clearing or disturbance of vegetation for a purpose associated with the construction of prescribed tidal works, including, for example, parking for construction or workers’ vehicles or stockpiling of construction materials—</txt><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.16-tble2-para1.a-para2.i" guid="_b56e5553-afa4-4405-8c3d-0effdf98f6d5" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">is avoided; or</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.16-tble2-para1.a-para2.ii" guid="_0dcb3792-af4d-41c8-9636-33480c4f5186" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">if the clearing or disturbance of vegetation for a purpose associated with the construction of the works can not be avoided—the clearing or disturbance is limited to the smallest area of land reasonably necessary for the purpose;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.16-tble2-para1.b" guid="_6c84cde4-b8a8-4ecd-8e93-7364cd587822" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">any other relevant planning scheme standard that is not inconsistent with the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.16-tble2-para1.a" target.guid="_02a1fa63-0fae-4925-8bb9-cd33e8616d0e" check="valid">paragraph&#160;(a)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.17" guid="_7da0dd3f-f20f-47d8-8840-2363e8a973ea"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.17-tble1" guid="_4ab6d3fc-9d3a-4f6b-b0b9-4466667d1939"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.17-tble1-para1.7.3" guid="_b195ab42-c16c-442f-9239-0590c582befd" affected.by.uncommenced="0"><no>7.3</no><block><txt break.before="1">After the construction of prescribed tidal works, any land damaged or destabilised by, and any vegetation damaged, destroyed or removed by, the construction of the works is rehabilitated.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.17-tble2" guid="_3f905ba9-54b3-4281-b380-7907d52ca046"><block><txt break.before="1">Land or vegetation affected by the prescribed tidal works is dealt with in a way consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.17-tble2-para1.a" guid="_780d0fd3-9042-47f8-819c-8977aac1d822" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.17-tble2-para1.b" target.guid="_e1857b8e-99a9-4e54-b60b-51e828e469d4" check="valid">paragraph&#160;(b)</intref>—</txt><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.17-tble2-para1.a-para2.i" guid="_41730848-bf13-4d57-8b8c-861939b0f443" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">land surfaces damaged or destabilised by the prescribed tidal works are restored and stabilised; and</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.17-tble2-para1.a-para2.ii" guid="_ae175426-1adf-48b4-96bd-3a3d6a403c52" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">vegetation damaged, destroyed or removed by prescribed tidal works is replaced with native vegetation for the locality within which the works are located, to the extent it is reasonably practicable to replace the vegetation with native vegetation;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.17-tble2-para1.b" guid="_e1857b8e-99a9-4e54-b60b-51e828e469d4" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.17-tble2-para1.a" target.guid="_780d0fd3-9042-47f8-819c-8977aac1d822" check="valid">paragraph&#160;(a)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.17-tble2-para1.a" target.guid="_780d0fd3-9042-47f8-819c-8977aac1d822" check="valid">paragraph&#160;(a)</intref>;</txt></block></tli></tlist><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.17-tble2-para1.c" guid="_f59762f0-8608-4711-8dbf-5e524ad4fac7" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="1">any other relevant planning scheme standard that is not inconsistent with the standards mentioned in paragraphs (a) and (b).</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.18" guid="_3e55ab4b-6f37-4e53-a9c3-df00006f77a9"><entry namest="1" nameend="2" align="center" valign="top" id="sch.3-pt.3-tbl-tblr-oc.18-tble1" guid="_a6f6ef59-ef39-4efb-9773-d288fbede15e"><block><txt break.before="1">Public access—availability</txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.19" guid="_8890759e-ae11-43ae-a074-e856f0b3efc4"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.19-tble1" guid="_879f7cf6-ed46-4f45-91b2-6359df5f6d24"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.19-tble1-para1.8.1" guid="_b88e53a5-48bf-425e-b5ad-dffaf8f36750" affected.by.uncommenced="0"><no>8.1</no><block><txt break.before="1">Prescribed tidal works do not have a significant adverse effect on the availability of public access to, along or across State coastal land.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.19-tble2" guid="_6225da59-6eb9-4281-b718-99dcc7eeeb9b"><block><txt break.before="1">The design and construction of the prescribed tidal works is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.19-tble2-para1.a" guid="_123d3c1e-0938-40d3-827e-51ac39acaf0f" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.19-tble2-para1.b" target.guid="_537b3f12-8c6e-4fe7-9c5a-0652f63760c4" check="valid">paragraph&#160;(b)</intref>, prescribed tidal works do not involve the erection or placement of any physical barrier preventing existing public access to, along or across State coastal land near the works;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.19-tble2-para1.b" guid="_537b3f12-8c6e-4fe7-9c5a-0652f63760c4" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.19-tble2-para1.a" target.guid="_123d3c1e-0938-40d3-827e-51ac39acaf0f" check="valid">paragraph&#160;(a)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.19-tble2-para1.a" target.guid="_123d3c1e-0938-40d3-827e-51ac39acaf0f" check="valid">paragraph&#160;(a)</intref>;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.19-tble2-para1.c" guid="_6c031a78-b5a4-4f6b-8a3f-e5320f8272c3" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="1">any other relevant planning scheme standard that is not inconsistent with the standards mentioned in paragraphs (a) and (b).</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.20" guid="_74250a1d-60ee-4fb4-8d87-732dd7235d91"><entry namest="1" nameend="2" align="center" valign="top" id="sch.3-pt.3-tbl-tblr-oc.20-tble1" guid="_b8b8fbfd-a6cb-4018-9d33-c311233c57eb"><block><txt break.before="1">Public access—safety</txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.21" guid="_7639a183-8c38-4dd3-b080-37ff0f5ab9e9"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.21-tble1" guid="_fe529cc8-283c-4d26-b1fc-b7b49fdf536a"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.21-tble1-para1.9.1" guid="_12419073-c1dc-47d7-9572-564fe65bb864" affected.by.uncommenced="0"><no>9.1</no><block><txt break.before="1">The location and design of prescribed tidal works does not adversely affect the safety of members of the public accessing State coastal land.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.21-tble2" guid="_be2401c1-f702-4b07-a09d-c8b63a806ef1"><block><txt break.before="1">Public access to State coastal land near the prescribed tidal works is consistent with each relevant planning scheme standard.</txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.22" guid="_49801e5d-d469-4bad-b334-aa1109ed306b"><entry namest="1" nameend="2" align="center" valign="top" id="sch.3-pt.3-tbl-tblr-oc.22-tble1" guid="_82f20a79-99a9-4c3b-943c-0837aa654c41"><block><txt break.before="1">Navigable access to, or egress from, lots that adjoin, or are in the immediate surroundings of, a lot connected to prescribed tidal works</txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.23" guid="_c550e3a5-26a2-48f6-9a2c-3093a3c636c1"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.23-tble1" guid="_adf5ec53-d740-45ac-8d78-168e25ac3c8e"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.23-tble1-para1.10.1" guid="_aa4e6a7c-07a9-4897-a561-f47eb9ed5a56" affected.by.uncommenced="0"><no>10.1</no><block><txt break.before="1">Prescribed tidal works that are for a private purpose do not adversely affect navigable access to, or navigable egress from, any lot that adjoins, or is in the immediate surroundings of, a lot connected to prescribed tidal works.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.23-tble2" guid="_8e18d0af-92a8-4ed0-83b5-1b732a7dbe5d"><block><txt break.before="1">The design and construction of the prescribed tidal works is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.23-tble2-para1.a" guid="_03755754-b797-41e4-82cb-c3146ca8581b" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.23-tble2-para1.b" target.guid="_72b60bca-661c-4a9c-91c1-7e106f5d815b" check="valid">paragraph&#160;(b)</intref>, prescribed tidal works—</txt><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.23-tble2-para1.a-para2.i" guid="_826084dc-4eb0-440a-b140-b87d93c2a508" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">for a lot connected to the works for which there is a water allocation area —are not constructed outside the water allocation area; and</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.23-tble2-para1.a-para2.ii" guid="_926b5b12-f072-4107-aa88-2680de9db2bb" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">for a lot connected to works for which there is no water allocation area —are no closer than 1.5m to that lot’s side boundary or extended side boundary;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.23-tble2-para1.b" guid="_72b60bca-661c-4a9c-91c1-7e106f5d815b" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.23-tble2-para1.a" target.guid="_03755754-b797-41e4-82cb-c3146ca8581b" check="valid">paragraph&#160;(a)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.23-tble2-para1.a" target.guid="_03755754-b797-41e4-82cb-c3146ca8581b" check="valid">paragraph&#160;(a)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.24" guid="_78862fdb-191a-47c3-b62b-cadd5174454b"><entry namest="1" nameend="2" align="center" valign="top" id="sch.3-pt.3-tbl-tblr-oc.24-tble1" guid="_21877b72-b325-440e-bfec-87ad8bcd8f3c"><block><txt break.before="1">Infrastructure, including, access, parking, sewerage and water services</txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.25" guid="_b10b4970-adfb-4f8b-a2ec-91bd76467d11"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.25-tble1" guid="_51a92d50-47ca-4cd5-a229-25ab2b2c752d"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.25-tble1-para1.11.1" guid="_ddd9892d-85d3-4436-8201-46361c8691a5" affected.by.uncommenced="0"><no>11.1</no><block><txt break.before="1">Prescribed tidal works have appropriate infrastructure, including, in particular, road access, parking facilities, sewerage services and water services, having regard to the following—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.25-tble1-para1.11.1-para2.a" guid="_e9abf4f1-f7fd-4e47-abed-3e59dcfbbef9" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">the nature and scale of the works;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.25-tble1-para1.11.1-para2.b" guid="_8e27472b-bfce-4c88-b73d-ba18dfde93f8" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">the number of people that may be on or at the works at any given time;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.25-tble1-para1.11.1-para2.c" guid="_a85466d5-8c76-4e7f-8cca-88933115717d" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="1">the number of vehicles that may be on or moored at the works at any given time;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.25-tble1-para1.11.1-para2.d" guid="_90cd6bce-6556-4e6f-8327-b6db9e25f8c3" affected.by.uncommenced="0"><no>(d)</no><block><txt break.before="1">the protection of any foreshores near the works and the vegetation and marine plants on the foreshores.</txt></block></tli></tlist></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.25-tble2" guid="_c9950844-8f9f-4981-9d21-99646807dff3"><block><txt break.before="1">The infrastructure for prescribed tidal works is consistent with each relevant planning scheme standard.</txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.26" guid="_c9159512-d74e-411d-be2a-bc492d4afd49"><entry namest="1" nameend="2" align="center" valign="top" id="sch.3-pt.3-tbl-tblr-oc.26-tble1" guid="_56ac59f7-dfa1-4222-96a4-23ed275fa923"><block><txt break.before="1">Design, construction and safety—all prescribed tidal works</txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.27" guid="_ec7f23e8-4143-4908-953e-8c62e0016094"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.27-tble1" guid="_a085c3c2-9fb7-4edc-810f-df7941f76cf9"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.27-tble1-para1.12.1" guid="_b070eb99-b47b-4cc4-b89f-dac6f2918a20" affected.by.uncommenced="0"><no>12.1</no><block><txt break.before="1">Prescribed tidal works are designed and constructed in a way to ensure they are structurally sound, having regard to the following—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.27-tble1-para1.12.1-para2.a" guid="_448fa1f0-729c-4de0-a522-3f05cd83f745" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">relevant engineering standards;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.27-tble1-para1.12.1-para2.b" guid="_354ed584-d3b9-4a18-8bde-585e90fe6033" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">the location of the works;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.27-tble1-para1.12.1-para2.c" guid="_9ef46551-6415-4358-abad-eb693bc57904" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="1">the purpose for which the works are to be used;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.27-tble1-para1.12.1-para2.d" guid="_584a188a-e2ac-4816-ba6c-a4737950f03f" affected.by.uncommenced="0"><no>(d)</no><block><txt break.before="1">the impact of flooding, storm tide, overtopping by waves, projected sea level rise, tidal influences and hydrodynamic forces;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.27-tble1-para1.12.1-para2.e" guid="_f6992c45-112a-4dad-bf55-a3099a50ee9d" affected.by.uncommenced="0"><no>(e)</no><block><txt break.before="1">the design life of the works; </txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.27-tble1-para1.12.1-para2.f" guid="_8783b137-cb8c-4078-9de2-075c2792abea" affected.by.uncommenced="0"><no>(f)</no><block><txt break.before="1">the dead load of the works and the intended live load for the works;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.27-tble1-para1.12.1-para2.g" guid="_6b34089c-f4ee-4a9c-9339-55d430300230" affected.by.uncommenced="0"><no>(g)</no><block><txt break.before="1">	the impact of hydrostatic pressures on the works;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.27-tble1-para1.12.1-para2.h" guid="_1ef20317-3825-46bf-80d5-5aa9443b4748" affected.by.uncommenced="0"><no>(h)</no><block><txt break.before="1">	the stability of individual components of the works, including, for example, boulders, concrete blocks or sandbags.</txt></block></tli></tlist></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.27-tble2" guid="_25bde155-d765-4352-8622-d956022e3a4a"><block><txt break.before="1">The design and construction of the prescribed tidal works is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.27-tble2-para1.a" guid="_2de50c40-b72c-4925-8433-96fff1a5c410" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.27-tble2-para1.c" target.guid="_affbf0f0-2d63-490e-a589-6fbfaf533975" check="valid">paragraph&#160;(c)</intref>, each Australian Standard relevant to the design or construction of structures, to the extent requirements stated in the Standard apply to the design or construction of prescribed tidal works;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.27-tble2-para1.b" guid="_3c3b9f4a-2cc4-4a5a-9ee4-baeded28467a" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.27-tble2-para1.c" target.guid="_affbf0f0-2d63-490e-a589-6fbfaf533975" check="valid">paragraph&#160;(c)</intref>, the projected sea level rise is factored into the design and construction of the prescribed tidal works;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.27-tble2-para1.c" guid="_affbf0f0-2d63-490e-a589-6fbfaf533975" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.27-tble2-para1.a" target.guid="_2de50c40-b72c-4925-8433-96fff1a5c410" check="valid">paragraph&#160;(a)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.27-tble2-para1.b" target.guid="_3c3b9f4a-2cc4-4a5a-9ee4-baeded28467a" check="valid">(b)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.27-tble2-para1.a" target.guid="_2de50c40-b72c-4925-8433-96fff1a5c410" check="valid">paragraph&#160;(a)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.27-tble2-para1.b" target.guid="_3c3b9f4a-2cc4-4a5a-9ee4-baeded28467a" check="valid">(b)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.28" guid="_8bdde5fc-5500-4d81-b900-9f3c2a7bf08d"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.28-tble1" guid="_4f36f6ae-4412-46fe-9f36-15d4626d562e"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.28-tble1-para1.12.2" guid="_61360e8d-0b0b-4446-8b21-fe1bbea9e4c1" affected.by.uncommenced="0"><no>12.2</no><block><txt break.before="1">Prescribed tidal works do not adversely affect the structural integrity of any existing revetment or seawall or another existing structure.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.28-tble2" guid="_0c30b530-0bd3-420e-816c-feb43de61068"><block><txt break.before="1">The design and construction of the prescribed tidal works is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.28-tble2-para1.a" guid="_3fedcef5-fa3f-48a9-abfd-436137b723c0" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.28-tble2-para1.b" target.guid="_95faf373-a554-42e9-95c7-cfa57601ac1f" check="valid">paragraph&#160;(b)</intref>, prescribed tidal works, including any abutment, piling or other structure connected with the works—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.28-tble2-para1.a-para2.i" guid="_3d519fd9-a421-41de-8f6b-3f1ae773d23b" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">do not place an additional load on any existing revetment or seawall or another existing structure; or</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.28-tble2-para1.a-para2.ii" guid="_2d3934c0-f779-4ad8-944a-6fd71af50bb3" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">can be structurally supported by an existing revetment or seawall or another existing structure;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.28-tble2-para1.b" guid="_95faf373-a554-42e9-95c7-cfa57601ac1f" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.28-tble2-para1.a" target.guid="_3fedcef5-fa3f-48a9-abfd-436137b723c0" check="valid">paragraph&#160;(a)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.28-tble2-para1.a" target.guid="_3fedcef5-fa3f-48a9-abfd-436137b723c0" check="valid">paragraph&#160;(a)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.29" guid="_a415e06b-6c3d-4ec6-bb53-ae36ae95197a"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.29-tble1" guid="_70fd33b9-8008-446e-b01f-8f23e026ebdb"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.29-tble1-para1.12.3" guid="_c052cbab-1e0a-4d8d-aae0-eb6a07eb7298" affected.by.uncommenced="0"><no>12.3</no><block><txt break.before="1">Prescribed tidal works are designed and constructed in a way to ensure they do not adversely affect the stability of the bed and banks of tidal water.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.29-tble2" guid="_d3287422-93ae-4823-8e94-38bc09796aea"><block><txt break.before="1">The design and construction of the prescribed tidal works is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.29-tble2-para1.a" guid="_020834de-8eb3-4478-8fc5-dcc9d7efabc5" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.29-tble2-para1.b" target.guid="_81de0b13-ca44-4d6b-9110-2039d0c12f68" check="valid">paragraph&#160;(b)</intref>, prescribed tidal works do not cause, by changing the flow of water, the removal of, or disturbance to, the sediment on the bed and banks of tidal water;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.29-tble2-para1.b" guid="_81de0b13-ca44-4d6b-9110-2039d0c12f68" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.29-tble2-para1.a" target.guid="_020834de-8eb3-4478-8fc5-dcc9d7efabc5" check="valid">paragraph&#160;(a)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.29-tble2-para1.a" target.guid="_020834de-8eb3-4478-8fc5-dcc9d7efabc5" check="valid">paragraph&#160;(a)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.30" guid="_1950e7d4-b5ad-4b27-bace-8ce322a7f6f7"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.30-tble1" guid="_ca6ba4d6-9422-47cc-b31d-d35ff6e9f094"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.30-tble1-para1.12.4" guid="_133bc946-d928-4862-a4a4-44135ab6ac27" affected.by.uncommenced="0"><no>12.4</no><block><txt break.before="1">Prescribed tidal works are designed and constructed using materials suitable for marine environments, having regard to their ability to resist the following—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.30-tble1-para1.12.4-para2.a" guid="_508d462e-655f-44c8-b461-c1f68fbde8aa" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">attack by marine organisms;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.30-tble1-para1.12.4-para2.b" guid="_e5ca0c7c-363a-458d-81cc-09bb3d4055c3" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">corrosion;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.30-tble1-para1.12.4-para2.c" guid="_d5387439-fbb5-49e2-a758-add452ab9ebe" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="1">deterioration or breakage resulting from exposure to environmental conditions including, for example, the following—</txt><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.30-tble1-para1.12.4-para2.c-para3.i" guid="_a3ed8449-bdfd-404e-805f-8f89dd39ffc9" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">abrasion;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.30-tble1-para1.12.4-para2.c-para3.ii" guid="_30a350c4-c76f-4409-ad67-9ced26d0d988" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">immersion in seawater;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.30-tble1-para1.12.4-para2.c-para3.iii" guid="_bce19ecd-fe02-42d9-94f5-a170db2f3123" affected.by.uncommenced="0"><no>(iii)</no><block><txt break.before="1">wave action.</txt></block></tli></tlist></block></tli></tlist></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.30-tble2" guid="_9d906880-3aa6-46fb-9088-e2145d7a0137"><block><txt break.before="1">The design and construction of the prescribed tidal works is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.30-tble2-para1.a" guid="_f66a9cb6-f008-4682-93ad-339f08ac3e13" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.30-tble2-para1.b" target.guid="_8e480b54-3db5-43ad-8796-d97bfa991ca9" check="valid">paragraph&#160;(b)</intref>, each Australian Standard relevant to the materials that should be used, or the measures that should be taken to treat materials used, for structures, to the extent the requirements stated in the Standard apply to structures located in a marine environment;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.30-tble2-para1.b" guid="_8e480b54-3db5-43ad-8796-d97bfa991ca9" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.30-tble2-para1.a" target.guid="_f66a9cb6-f008-4682-93ad-339f08ac3e13" check="valid">paragraph&#160;(a)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.30-tble2-para1.a" target.guid="_f66a9cb6-f008-4682-93ad-339f08ac3e13" check="valid">paragraph&#160;(a)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.31" guid="_f6d26a58-84bd-4895-9b13-f603e307b64b"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.31-tble1" guid="_586b45cc-10ab-46d2-bd34-8898d91babc6"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.31-tble1-para1.12.5" guid="_e7047794-ad74-4d19-a249-7b1bc8b6b0df" affected.by.uncommenced="0"><no>12.5</no><block><txt break.before="1">Prescribed tidal works are designed and constructed in a way to ensure they do not adversely affect the operation or maintenance of any existing stormwater outlet.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.31-tble2" guid="_d41f7e79-055b-4451-880f-f581c663218d"><block><txt break.before="1">The design and construction of the prescribed tidal works is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.31-tble2-para1.a" guid="_5efcdba1-a1b9-4094-ab7f-b77d2860adb9" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.31-tble2-para1.c" target.guid="_e8101949-1574-44b0-af4e-cbc8ec5e921a" check="valid">paragraph&#160;(c)</intref>, vessels moored at prescribed tidal works do not impede the discharge of stormwater;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.31-tble2-para1.b" guid="_3888158a-64de-4d21-a48c-7c46b487deb0" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.31-tble2-para1.c" target.guid="_e8101949-1574-44b0-af4e-cbc8ec5e921a" check="valid">paragraph&#160;(c)</intref>, prescribed tidal works do not restrict access to any stormwater outlet;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.31-tble2-para1.c" guid="_e8101949-1574-44b0-af4e-cbc8ec5e921a" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.31-tble2-para1.a" target.guid="_5efcdba1-a1b9-4094-ab7f-b77d2860adb9" check="valid">paragraph&#160;(a)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.31-tble2-para1.b" target.guid="_3888158a-64de-4d21-a48c-7c46b487deb0" check="valid">(b)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.31-tble2-para1.a" target.guid="_5efcdba1-a1b9-4094-ab7f-b77d2860adb9" check="valid">paragraph&#160;(a)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.31-tble2-para1.b" target.guid="_3888158a-64de-4d21-a48c-7c46b487deb0" check="valid">(b)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.32" guid="_9990faf6-d7d9-433c-af08-e2a2105498a8"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.32-tble1" guid="_a63d24db-de0e-4e5b-a7c3-bc3a3923379d"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.32-tble1-para1.12.6" guid="_62b6e230-1dea-4f6a-ac02-44c206fe08d0" affected.by.uncommenced="0"><no>12.6</no><block><txt break.before="1">Prescribed tidal works are designed and constructed in a way to ensure they do not adversely affect the water quality of tidal water, including, in particular, as a result of—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.32-tble1-para1.12.6-para2.a" guid="_f9e694e0-d278-4eb3-8b27-ada7d2dd3ada" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">release, into the tidal water, of materials used in the construction of the works; or</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.32-tble1-para1.12.6-para2.b" guid="_1e3d008c-3e26-4b8f-8ac8-ab3b985e22dd" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">disturbance to the sediment on the bed and banks of the tidal water; or</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.32-tble1-para1.12.6-para2.c" guid="_899bfc0e-6279-4926-82bc-9c114611d77e" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="1">exposure to acid sulphate soils.</txt></block></tli></tlist></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.32-tble2" guid="_33ee5587-3976-42fd-a722-5ab58d964256"><block><txt break.before="1">The design and construction of the prescribed tidal works is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.32-tble2-para1.a" guid="_1caa1c89-e51f-4f7c-846a-9ded3345a1d6" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.32-tble2-para1.b" target.guid="_b3dec86c-baec-46f9-88b6-485546b1de01" check="valid">paragraph&#160;(b)</intref>, each Australian Standard relevant to the design or construction of structures under, within or over tidal water, to the extent the requirements stated in the Standard are directed at maintaining the water quality of tidal water;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.32-tble2-para1.b" guid="_b3dec86c-baec-46f9-88b6-485546b1de01" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.32-tble2-para1.a" target.guid="_1caa1c89-e51f-4f7c-846a-9ded3345a1d6" check="valid">paragraph&#160;(a)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.32-tble2-para1.a" target.guid="_1caa1c89-e51f-4f7c-846a-9ded3345a1d6" check="valid">paragraph&#160;(a)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.33" guid="_6c049a82-a89f-4131-a378-448d61c9c037"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.33-tble1" guid="_c810d659-60cb-456c-8a40-102ab62c5395"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.33-tble1-para1.12.7" guid="_41fc2fff-5365-4e2a-a035-0cd8d97cec49" affected.by.uncommenced="0"><no>12.7</no><block><txt break.before="1">Prescribed tidal works are designed and constructed in a way to ensure they are safe for persons using the works.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.33-tble2" guid="_686c8918-ddef-477c-a3c1-4275e7856630"><block><txt break.before="1">The design and construction of the prescribed tidal works is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.33-tble2-para1.a" guid="_946f1ddc-7eec-4a85-b25a-febb6c17666f" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.33-tble2-para1.d" check="invalid">paragraph&#160;(d)</intref>, each Australian Standard relevant to the design or construction of structures, the materials that should be used, or the measures that should be taken to treat materials used, for structures, to the extent the requirements stated in the Standard are directed at ensuring any surface of prescribed tidal works on which a person may stand or walk is—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.33-tble2-para1.a-para2.i" guid="_efcfb286-bc4c-4073-8899-07aa7391ac87" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">not slippery; and</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.33-tble2-para1.a-para2.ii" guid="_104c3e7e-d71d-4b7e-abb3-86ec9cd11117" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">does not have any feature that may cause the person to trip or fall;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.33-tble2-para1.b" guid="_951eba23-f50f-4ebd-84d3-66ff63fadfb3" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.33-tble2-para1.d" check="invalid">paragraph&#160;(d)</intref>, any part of prescribed tidal works that is unsafe for persons using the works is surrounded by adequate barriers to deter persons from entering the part;</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.34" guid="_4b9f78a6-2b13-4423-a21b-77aa55b26124"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.34-tble1" guid="_cc534d3c-4258-411e-913b-c01d696d1734"><block><txt break.before="1"/></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.34-tble2" guid="_01337671-7528-425f-8da4-f3db100a6775"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.34-tble2-para1.c" guid="_bb1c84f2-69a3-417d-aea5-a6b7d63d8126" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.34-tble2-para1.d" target.guid="_f99edc06-90a9-422d-a77e-3b6b17139ddc" check="valid">paragraph&#160;(d)</intref>, each Australian Standard relevant to the design or construction of structures, to the extent the requirements stated in the Standard are directed at ensuring prescribed tidal works provide safety ladders or other design features for the safety of a person who falls off the works into water;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.34-tble2-para1.d" guid="_f99edc06-90a9-422d-a77e-3b6b17139ddc" affected.by.uncommenced="0"><no>(d)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.34-tble2-para1.a" check="invalid">paragraph&#160;(a)</intref>, <intref refid="sch.3-pt.3-tbl-tblr-oc.34-tble2-para1.b" check="invalid">(b)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.34-tble2-para1.c" target.guid="_bb1c84f2-69a3-417d-aea5-a6b7d63d8126" check="valid">(c)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.34-tble2-para1.a" check="invalid">paragraph&#160;(a)</intref>, <intref refid="sch.3-pt.3-tbl-tblr-oc.34-tble2-para1.b" check="invalid">(b)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.34-tble2-para1.c" target.guid="_bb1c84f2-69a3-417d-aea5-a6b7d63d8126" check="valid">(c)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.35" guid="_d991945a-dca1-4ce7-b8a5-b92aca25d378"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.35-tble1" guid="_6df7eb9d-7262-40a3-ab6a-d5b0886ff43e"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.35-tble1-para1.12.8" guid="_8c5cf6d1-cb3d-419d-8e70-9c47087e14b4" affected.by.uncommenced="0"><no>12.8</no><block><txt break.before="1">Appropriate measures are taken for prescribed tidal works for a non-private purpose to ensure an unsupportable live load is not applied to the works by persons or vehicles.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.35-tble2" guid="_3fd735c5-06c7-478b-bf58-332f28826f24"><block><txt break.before="1">The design and construction of the prescribed tidal works is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.35-tble2-para1.a" guid="_14b59f8c-f7f8-497a-8321-91573337085e" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.35-tble2-para1.b" target.guid="_93cd91eb-fab8-429c-880b-41b8e8998c11" check="valid">paragraph&#160;(b)</intref>, prescribed tidal works have erected or placed in position on or near the works, a sign that—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.35-tble2-para1.a-para2.i" guid="_34fb341d-5d1d-47b9-b314-f4b7b6b0b188" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">is visible at all times; and</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.35-tble2-para1.a-para2.ii" guid="_78c9e7aa-485c-4d70-9958-46ba43c79108" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">states the maximum live load that may be applied to the works, in terms of the maximum number of persons that may be on the works at any given time or the maximum number of vehicles of a particular type that may be on or moored at the works at any given time;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.35-tble2-para1.b" guid="_93cd91eb-fab8-429c-880b-41b8e8998c11" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.35-tble2-para1.a" target.guid="_14b59f8c-f7f8-497a-8321-91573337085e" check="valid">paragraph&#160;(a)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.35-tble2-para1.a" target.guid="_14b59f8c-f7f8-497a-8321-91573337085e" check="valid">paragraph&#160;(a)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.36" guid="_94b5dfb9-1ff8-491c-9a39-0db53e4651d5"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.36-tble1" guid="_1c17317d-6e59-4446-9d69-af7d0663e4f0"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.36-tble1-para1.12.9" guid="_3825e64e-cf6c-4834-b452-1f74d9a70285" affected.by.uncommenced="0"><no>12.9</no><block><txt break.before="1">Prescribed tidal works, other than a prescribed deck for a private purpose, are designed and constructed in a way to ensure the use of tidal water in a canal for a non-maritime purpose is minimised.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.36-tble2" guid="_a6cb98b8-6a1b-4a78-99e5-c52f2199c313"><block><txt break.before="1">The design and construction of the prescribed tidal works is consistent with each relevant planning scheme standard.</txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.37" guid="_733eb659-be3f-4aaa-baa5-34fb32384f2d"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.37-tble1" guid="_5f706e49-fa2a-4cc3-bb07-ae50c888f5e0"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.37-tble1-para1.12.10" guid="_60fa42ce-8314-409e-8294-b2d40dd534f9" affected.by.uncommenced="0"><no>12.10</no><block><txt break.before="1"> Prescribed tidal works that are a prescribed deck and for a private purpose, are designed and constructed in a way to ensure the use of tidal water in a canal for a non-maritime purpose is minimised.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.37-tble2" guid="_2f690032-7cf7-4ee2-8171-1631dbd0eec3"><block><txt break.before="1">(s 5(2) outcome)</txt></block><block><txt break.before="1">The design and construction of the prescribed deck is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.37-tble2-para1.a" guid="_a380217c-e648-4cbd-80c0-428c630f9ede" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.37-tble2-para1.c" target.guid="_28661372-971c-450b-8cbe-368db6540edc" check="valid">paragraph&#160;(c)</intref>, a prescribed deck does not extend more than 3m from the waterfront boundary of the lot connected to the deck;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.37-tble2-para1.b" guid="_acdf838d-5c95-4842-a516-943472812b95" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.37-tble2-para1.c" target.guid="_28661372-971c-450b-8cbe-368db6540edc" check="valid">paragraph&#160;(c)</intref>, a prescribed deck is at least 3m inside of the side boundary or extended side boundary of the lot connected to the deck;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.37-tble2-para1.c" guid="_28661372-971c-450b-8cbe-368db6540edc" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.37-tble2-para1.a" target.guid="_a380217c-e648-4cbd-80c0-428c630f9ede" check="valid">paragraph&#160;(a)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.37-tble2-para1.b" target.guid="_acdf838d-5c95-4842-a516-943472812b95" check="valid">(b)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.37-tble2-para1.a" target.guid="_a380217c-e648-4cbd-80c0-428c630f9ede" check="valid">paragraph&#160;(a)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.37-tble2-para1.b" target.guid="_acdf838d-5c95-4842-a516-943472812b95" check="valid">(b)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.38" guid="_52898f13-7789-4199-9738-53acc291a394"><entry namest="1" nameend="2" align="center" valign="top" id="sch.3-pt.3-tbl-tblr-oc.38-tble1" guid="_b926c2d7-1a63-4e38-adfc-0b193b797ca1"><block><txt break.before="1">Design, construction and safety—boat ramps and slipways for private purpose</txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.39" guid="_37f48c9f-0cc0-4e48-a3fa-501e576c475b"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.39-tble1" guid="_45672e24-c235-4a9f-9e52-c0547b21260b"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.39-tble1-para1.13.1" guid="_08bc3037-8cda-4807-93be-4eeb832cbc27" affected.by.uncommenced="0"><no>13.1</no><block><txt break.before="1">Prescribed tidal works that are a boat ramp or slipway for a private purpose are designed and constructed in a way to ensure they are structurally sound while also ensuring the safe movement of vehicles or persons between the boat ramp or slipway and the surface of the land on which the boat ramp or slipway is located.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.39-tble2" guid="_e8ea0d01-c13e-4b8a-9a52-f0d4201e0b7d"><block><txt break.before="1">(s 5(2) outcome)</txt></block><block><txt break.before="1">The design and construction of the boat ramp or slipway is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.39-tble2-para1.a" guid="_962345d2-0c0c-4bcc-a542-3e7318f91b40" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.39-tble2-para1.c" target.guid="_08cae695-e6e1-48df-a2a2-d9ec307bb495" check="valid">paragraph&#160;(c)</intref>, the walls at the edge of the boat ramp or slipway penetrate into the earth at least 600mm below the surface of the land on which the boat ramp or slipway is located;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.39-tble2-para1.b" guid="_cb68040f-86b1-4717-9489-844d1c7a0e14" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.39-tble2-para1.c" target.guid="_08cae695-e6e1-48df-a2a2-d9ec307bb495" check="valid">paragraph&#160;(c)</intref>, the surface of the boat ramp or slipway is no more than 200mm above the surface of the land on which it is located;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.39-tble2-para1.c" guid="_08cae695-e6e1-48df-a2a2-d9ec307bb495" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.39-tble2-para1.a" target.guid="_962345d2-0c0c-4bcc-a542-3e7318f91b40" check="valid">paragraph&#160;(a)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.39-tble2-para1.b" target.guid="_cb68040f-86b1-4717-9489-844d1c7a0e14" check="valid">(b)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.39-tble2-para1.a" target.guid="_962345d2-0c0c-4bcc-a542-3e7318f91b40" check="valid">paragraph&#160;(a)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.39-tble2-para1.b" target.guid="_cb68040f-86b1-4717-9489-844d1c7a0e14" check="valid">(b)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.40" guid="_806c3ba6-6887-4c0c-a899-f061a6005086"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.40-tble1" guid="_84ba4bb0-dedd-4e0d-82d6-1ccdaad252ee"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.40-tble1-para1.13.2" guid="_2be0a57b-69fa-4490-9b3f-b19c658cdd7e" affected.by.uncommenced="0"><no>13.2</no><block><txt break.before="1">Prescribed tidal works that are a boat ramp or slipway for a private purpose are designed and constructed in a way to ensure the safe movement of vehicles or persons over the boat ramp or slipway.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.40-tble2" guid="_c22e7c58-a017-4ecd-85d1-bfd678fc9750"><block><txt break.before="1">(s 5(2) outcome)</txt></block><block><txt break.before="1">The design and construction of the boat ramp or slipway is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.40-tble2-para1.a" guid="_0413b77e-2f92-43f6-9d42-bae9edfb890c" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.40-tble2-para1.d" check="invalid">paragraph&#160;(d)</intref>, the upper surface of a boat ramp or slipway has a width of—</txt><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.40-tble2-para1.a-para2.i" guid="_19bdfe62-f2af-4309-baa5-e3de5ffcb67d" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">for a boat ramp or slipway with vehicle access—no less than 3.6m; or</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.40-tble2-para1.a-para2.ii" guid="_242f66dc-58da-4fe1-8986-23a4a55b8a67" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">for a boat ramp or slipway without vehicle access—no less than 3.0m;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.40-tble2-para1.b" guid="_7b00c289-f467-4477-9eec-721beecc076c" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.40-tble2-para1.d" check="invalid">paragraph&#160;(d)</intref>, the whole upper surface of a boat ramp or slipway is treated to prevent it from becoming slippery by using any of the following methods—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.40-tble2-para1.b-para2.i" guid="_87031fff-2d74-4a2f-ad84-8418bada8278" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">forming grooves over the surface, as close as possible to 40mm wide, 20mm deep and 150mm apart, and at an angle as close as possible to 70&#176; to the centre-line of the boat ramp or slipway;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.40-tble2-para1.b-para2.ii" guid="_3df4672c-eb92-4083-80bb-d063b2e30165" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">covering the surface with a substance ordinarily used on slippery surfaces to prevent skidding;</txt></block></tli></tlist></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.41" guid="_0b3c4945-d0c7-41dd-a123-ae04d5dc2f19"><entry colname="1" id="sch.3-pt.3-tbl-tblr-oc.41-tble1" guid="_eb338ac2-4795-4280-aa9e-672598c34cda"><block><txt break.before="1"/></block></entry><entry colname="2" id="sch.3-pt.3-tbl-tblr-oc.41-tble2" guid="_67d063b9-1934-43d5-b439-b0e54558c66c"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.41-tble2-para1" guid="_c905927d-98d3-412e-bd4e-60e4d8788264" affected.by.uncommenced="0"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.41-tble2-para1-para2.iii" guid="_f23673de-285d-4afe-b76a-d77be7d15099" affected.by.uncommenced="0"><no>(iii)</no><block><txt break.before="1">making, through a physical act, the surface coarse before it sets, including, for example, by raking the surface;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.41-tble2-para1.c" guid="_ea0eee39-2d60-4bc1-813a-233b9b6be7b0" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.41-tble2-para1.d" target.guid="_291102b5-bc7f-4f75-b75e-bea5c1ad0aaa" check="valid">paragraph&#160;(d)</intref>, the upper surface of a boat ramp or slipway for which a winch is not used to hoist or haul vessels onto the boat ramp or slipway is at a gradient of not steeper than—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.41-tble2-para1.c-para2.i" guid="_e5c98e56-30d9-4472-b291-3a73fec25237" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">if the surface is treated by using a method mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.41-tble2-para1.b" check="invalid">paragraph&#160;(b)</intref><intref refid="sch.3-pt.3-tbl-tblr-oc.41-tble2-para1.b-para2.i" check="invalid">(i)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.41-tble2-para1.b-para2.ii" check="invalid">(ii)</intref>—1:7; or</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.41-tble2-para1.c-para2.ii" guid="_9397563f-7a36-41af-9896-e006a35336a9" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">otherwise—1:10;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.41-tble2-para1.d" guid="_291102b5-bc7f-4f75-b75e-bea5c1ad0aaa" affected.by.uncommenced="0"><no>(d)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.41-tble2-para1.a" check="invalid">paragraph&#160;(a)</intref>, <intref refid="sch.3-pt.3-tbl-tblr-oc.41-tble2-para1.b" check="invalid">(b)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.41-tble2-para1.c" target.guid="_ea0eee39-2d60-4bc1-813a-233b9b6be7b0" check="valid">(c)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.41-tble2-para1.a" check="invalid">paragraph&#160;(a)</intref>, <intref refid="sch.3-pt.3-tbl-tblr-oc.41-tble2-para1.b" check="invalid">(b)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.41-tble2-para1.c" target.guid="_ea0eee39-2d60-4bc1-813a-233b9b6be7b0" check="valid">(c)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.42" guid="_a2fd5600-6de3-49e0-b9a1-7fc7b9971db1"><entry namest="1" nameend="2" align="center" valign="top" id="sch.3-pt.3-tbl-tblr-oc.42-tble1" guid="_8af45d84-aa9d-4f1d-a77b-8aafdbf20f0d"><block><txt break.before="1">Design, construction and safety—bridges</txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.43" guid="_cffc708e-5859-44eb-bf40-006b8aa80a97"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.43-tble1" guid="_60f5f9b2-f68e-44d3-9e3f-5a94bab7d391"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.43-tble1-para1.14.1" guid="_89d16bf2-61e4-41df-aef9-89c19c065709" affected.by.uncommenced="0"><no>14.1</no><block><txt break.before="1">Prescribed tidal works that are a bridge do not adversely affect existing public use of tidal water, including, for example, use of the tidal water for canoeing, swimming or other recreational activities.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.43-tble2" guid="_3c93ec8d-7c1c-45a7-a70b-92540a09d2ea"><block><txt break.before="1">The design and construction of the bridge is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.43-tble2-para1.a" guid="_34095e46-998e-4e16-9a91-47cb037fb104" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.43-tble2-para1.b" target.guid="_78483805-b376-4c56-b13d-579e9081e5ae" check="valid">paragraph&#160;(b)</intref>, the clearance levels under a bridge are high enough to allow continued public use of tidal water over which it is constructed;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.43-tble2-para1.b" guid="_78483805-b376-4c56-b13d-579e9081e5ae" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.43-tble2-para1.a" target.guid="_34095e46-998e-4e16-9a91-47cb037fb104" check="valid">paragraph&#160;(a)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.43-tble2-para1.a" target.guid="_34095e46-998e-4e16-9a91-47cb037fb104" check="valid">paragraph&#160;(a)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.44" guid="_2ae1ab0f-3098-4acf-911f-31e511b2309e"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.44-tble1" guid="_4e356bed-f91d-4788-b2dc-b116b0da6fa9"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.44-tble1-para1.14.2" guid="_efca40e1-bd4c-4e59-a9f3-04a653208f36" affected.by.uncommenced="0"><no>14.2</no><block><txt break.before="1">Prescribed tidal works that are a bridge do not adversely affect the flow of tidal water under the bridge.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.44-tble2" guid="_41a15f7b-2fb3-409f-ba00-820c59849428"><block><txt break.before="1">The design and construction of the bridge is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.44-tble2-para1.a" guid="_5e00a712-2574-4bfe-b781-9b19725ef5c0" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.44-tble2-para1.b" target.guid="_91aa9b2e-5166-4b9d-a1c6-2d7555ebbda1" check="valid">paragraph&#160;(b)</intref>—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.44-tble2-para1.a-para2.i" guid="_e4c4c0ef-ebc8-4f91-99a4-52b353cd1922" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">if a bridge can be adequately supported without erecting or placing a foundation support in tidal water—no foundation support to support the bridge is erected or placed in the tidal water; or</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.44-tble2-para1.a-para2.ii" guid="_89613c9d-c0cc-4c40-87f7-3ceae624f590" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">otherwise—only the minimum number of foundation supports required to support the bridge is used;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.44-tble2-para1.b" guid="_91aa9b2e-5166-4b9d-a1c6-2d7555ebbda1" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.44-tble2-para1.a" target.guid="_5e00a712-2574-4bfe-b781-9b19725ef5c0" check="valid">paragraph&#160;(a)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.44-tble2-para1.a" target.guid="_5e00a712-2574-4bfe-b781-9b19725ef5c0" check="valid">paragraph&#160;(a)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.45" guid="_d22e1776-a0ad-4f37-8d14-a3044487dc7f"><entry namest="1" nameend="2" align="center" valign="top" id="sch.3-pt.3-tbl-tblr-oc.45-tble1" guid="_3d0dca3a-f0eb-4422-adcb-bfc247ceb947"><block><txt break.before="1">Design, construction and safety—prescribed decks</txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.46" guid="_c84b6d3e-ccb8-4107-bf73-3bd6985ca272"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.46-tble1" guid="_54177d98-ebae-489b-ab4e-2291e0f91b46"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.46-tble1-para1.15.1" guid="_6954e229-46c3-4a25-8e6d-4f657310ca9b" affected.by.uncommenced="0"><no>15.1</no><block><txt break.before="1">Prescribed tidal works that are a prescribed deck and for a private purpose are designed and constructed in a way to ensure the deck is able to support its intended loads, having regard to its relevant loading matters.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.46-tble2" guid="_84b0f784-eede-4868-9508-51699d69dc24"><block><txt break.before="1">(s 5(2) outcome)</txt></block><block><txt break.before="1">The design and construction of the prescribed deck is consistent with the following standards—</txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.47" guid="_f930b7ee-0798-484e-884b-2445e5a0239d"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.47-tble1" guid="_dc399cea-cff0-431c-a57c-349e61de611b"><block><txt break.before="1"/></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.47-tble2" guid="_ba4d932c-bb1e-42f9-bacf-cb03d5c33027"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.47-tble2-para1.a" guid="_2fb4ff6e-c1d2-4f90-96c2-685b954fa9a3" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.47-tble2-para1.b" target.guid="_4bf183f3-f7bb-4821-a7fb-b67291247819" check="valid">paragraph&#160;(b)</intref>, each of the following Australian Standards to the extent requirements stated in the Standard apply to relevant loading matters for the design or construction of the prescribed deck—</txt><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.47-tble2-para1.a-para2.i" guid="_b7342e7d-6d83-4014-9837-590e62dc9d3c" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">AS/NZS 1170.0;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.47-tble2-para1.a-para2.ii" guid="_2005dc0d-fd5d-4071-bc19-c69c738adc6a" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">AS/NZS 1170.1;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.47-tble2-para1.a-para2.iii" guid="_c430b1d2-4f14-4b62-8e8c-1151a3fbaf97" affected.by.uncommenced="0"><no>(iii)</no><block><txt break.before="1">AS/NZS 1170.2;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.47-tble2-para1.a-para2.iv" guid="_019f4fc5-7e8f-48a3-8c8f-761562df9d79" affected.by.uncommenced="0"><no>(iv)</no><block><txt break.before="1">AS 4997;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.47-tble2-para1.b" guid="_4bf183f3-f7bb-4821-a7fb-b67291247819" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.47-tble2-para1.a" target.guid="_2fb4ff6e-c1d2-4f90-96c2-685b954fa9a3" check="valid">paragraph&#160;(a)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.47-tble2-para1.a" target.guid="_2fb4ff6e-c1d2-4f90-96c2-685b954fa9a3" check="valid">paragraph&#160;(a)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.48" guid="_76c714b9-9cb2-4603-993e-1f91e837ae0c"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.48-tble1" guid="_9bba8b4c-0e33-4731-8f61-9242ecfc9e95"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.48-tble1-para1.15.2" guid="_a1c7bb09-3344-4cf0-95c2-f553a63872ef" affected.by.uncommenced="0"><no>15.2</no><block><txt break.before="1">Prescribed tidal works that are a prescribed deck and for a non-private purpose are designed and constructed in a way to ensure the deck is able to support its intended loads, having regard to its relevant loading matters.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.48-tble2" guid="_d6cf1e71-2a04-4c3c-a17a-a11afe4ca4a9"><block><txt break.before="1">(s 5(2) outcome)</txt></block><block><txt break.before="1">The design or construction of the prescribed deck is consistent with the following standards—</txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.49" guid="_0f08a97b-abb1-42d6-82d2-31a22e5c0296"><entry colname="1" id="sch.3-pt.3-tbl-tblr-oc.49-tble1" guid="_d279ddbb-90f2-4b82-a241-d47bd3f7a029"/><entry colname="2" id="sch.3-pt.3-tbl-tblr-oc.49-tble2" guid="_8935d608-73dc-413b-b41d-9a27d68daae2"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.49-tble2-para1.a" guid="_88c617f9-812d-4368-aa67-98162d32b8f0" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.49-tble2-para1.b" target.guid="_249545dc-3271-42bf-9a2c-c70e79e2a2c1" check="valid">paragraph&#160;(b)</intref>, each of the following Australian Standards to the extent requirements stated in the Standard apply to relevant loading matters for the design or construction of a prescribed deck—</txt><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.49-tble2-para1.a-para2.i" guid="_b66b0975-98ce-4b82-a6f1-8d6eac1a0ea7" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">AS/NZS 1170.0;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.49-tble2-para1.a-para2.ii" guid="_13f63349-094e-4a05-aad3-e9a2bec30201" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">AS/NZS 1170.1;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.49-tble2-para1.a-para2.iii" guid="_a225d7ce-202e-4f2f-824e-4a567fdf65b6" affected.by.uncommenced="0"><no>(iii)</no><block><txt break.before="1">AS/NZS 1170.2;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.49-tble2-para1.a-para2.iv" guid="_80f47fd1-c1df-49dd-b88a-f1a7bd78a5ae" affected.by.uncommenced="0"><no>(iv)</no><block><txt break.before="1">AS 1170.4;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.49-tble2-para1.a-para2.v" guid="_93f8ec82-d862-4cdd-8137-787be91487cb" affected.by.uncommenced="0"><no>(v)</no><block><txt break.before="1">AS 4997;</txt></block></tli></tlist></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.49-tble2-para1.b" guid="_249545dc-3271-42bf-9a2c-c70e79e2a2c1" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.49-tble2-para1.a" target.guid="_88c617f9-812d-4368-aa67-98162d32b8f0" check="valid">paragraph&#160;(a)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.49-tble2-para1.a" target.guid="_88c617f9-812d-4368-aa67-98162d32b8f0" check="valid">paragraph&#160;(a)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.50" guid="_27378875-6432-40a4-ba5c-bd748deef406"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.50-tble1" guid="_69c69b2e-650f-479a-962b-53c07a23cd1d"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.50-tble1-para1.15.3" guid="_2afb6c45-8a4a-484a-b973-fc62028433ca" affected.by.uncommenced="0"><no>15.3</no><block><txt break.before="1">Prescribed tidal works that are a prescribed deck do not prevent or hinder remedial work being undertaken on any bank of tidal water or for any existing revetment or seawall or another existing structure.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.50-tble2" guid="_1482616d-32a2-4dae-86e4-afc89cadab2a"><block><txt break.before="1">The design and construction of the prescribed deck is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.50-tble2-para1.a" guid="_7b9306b5-a69f-479a-ba15-ca465b7fdf14" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.50-tble2-para1.b" target.guid="_b6cd4bd6-316d-49b8-8bb0-3206d5f45373" check="valid">paragraph&#160;(b)</intref>, a prescribed deck either—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.50-tble2-para1.a-para2.i" guid="_b9873300-a98e-4cc8-8ed9-31eca4eebc7d" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">can be easily dismantled and reassembled; or</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.50-tble2-para1.a-para2.ii" guid="_e7b7bf43-eef9-4d31-8077-168bc68d3f2d" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">does not restrict the movement of machinery ordinarily used for remedial work to any bank of tidal water or any existing revetment or seawall or other existing structure;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.50-tble2-para1.b" guid="_b6cd4bd6-316d-49b8-8bb0-3206d5f45373" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.50-tble2-para1.a" target.guid="_7b9306b5-a69f-479a-ba15-ca465b7fdf14" check="valid">paragraph&#160;(a)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.50-tble2-para1.a" target.guid="_7b9306b5-a69f-479a-ba15-ca465b7fdf14" check="valid">paragraph&#160;(a)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.51" guid="_dc98dd4f-7b03-4b31-9009-d1238e70deb6"><entry namest="1" nameend="2" align="center" valign="top" id="sch.3-pt.3-tbl-tblr-oc.51-tble1" guid="_011413d8-757b-4e5a-8391-514a441a5c5b"><block><txt break.before="1">Design, construction and safety—jetties and piers</txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.52" guid="_cf7017a4-c92c-49d9-8ba1-f5b3d7552de4"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.52-tble1" guid="_f2cfe7b2-a447-4de2-807a-665a84a414d1"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.52-tble1-para1.16.1" guid="_436c1e69-394d-476a-bfd5-61dc7a5f7774" affected.by.uncommenced="0"><no>16.1</no><block><txt break.before="1">Prescribed tidal works that are a jetty or pier are designed and constructed in a way to ensure the jetty or pier is able to support its intended loads, having regard to its relevant loading matters.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.52-tble2" guid="_f9726606-daca-4eec-9014-e4b64bf1db58"><block><txt break.before="1">(s 5(2) outcome)</txt></block><block><txt break.before="1">The design and construction of the jetty or pier is consistent with the following standards—</txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.53" guid="_7b1d9484-fc89-49f7-b50e-3c4eafef535e"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.53-tble1" guid="_b43caf23-831d-4f7d-847b-e6a45e54bb08"><block><txt break.before="1"/></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.53-tble2" guid="_3389e8ac-7dd2-4f33-89ea-083c3f8e530e"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.53-tble2-para1.a" guid="_b2f6d806-7e1d-4371-a229-0191ee6dbca8" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.53-tble2-para1.b" target.guid="_735b3dec-b81b-456f-ac81-7340a2805a85" check="valid">paragraph&#160;(b)</intref>, each of the following Australian Standards to the extent requirements stated in the Standard apply to relevant loading matters for the design or construction of the jetty or pier—</txt><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.53-tble2-para1.a-para2.i" guid="_bcd42b85-f4a4-452c-b286-1c055efe4512" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">AS/NZS 1170.0;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.53-tble2-para1.a-para2.ii" guid="_1ea69e3d-1059-4bd6-a7ea-a2745776b003" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">AS/NZS 1170.1;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.53-tble2-para1.a-para2.iii" guid="_4ce98996-15c5-4d86-a458-0c270e48986c" affected.by.uncommenced="0"><no>(iii)</no><block><txt break.before="1">AS/NZS 1170.2;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.53-tble2-para1.a-para2.iv" guid="_59091663-d8a9-4f1e-8b12-c05cccf111f8" affected.by.uncommenced="0"><no>(iv)</no><block><txt break.before="1">AS 1170.4;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.53-tble2-para1.a-para2.v" guid="_7d1e91be-0e7d-4537-bf91-352330538651" affected.by.uncommenced="0"><no>(v)</no><block><txt break.before="1">AS 4997;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.53-tble2-para1.b" guid="_735b3dec-b81b-456f-ac81-7340a2805a85" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.53-tble2-para1.a" target.guid="_b2f6d806-7e1d-4371-a229-0191ee6dbca8" check="valid">paragraph&#160;(a)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.53-tble2-para1.a" target.guid="_b2f6d806-7e1d-4371-a229-0191ee6dbca8" check="valid">paragraph&#160;(a)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.54" guid="_86d8cd51-653c-4a3e-9e27-43be6b5652c5"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.54-tble1" guid="_c784809b-750f-4608-9649-103b4c867832"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.54-tble1-para1.16.2" guid="_dbde296f-c168-414e-b544-2a129ee9edc6" affected.by.uncommenced="0"><no>16.2</no><block><txt break.before="1">Prescribed tidal works that are a jetty or a pier are designed and constructed in a way to ensure the jetty or pier remains above the water at highest astronomical tide.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.54-tble2" guid="_9918df9e-1209-4f7b-82f0-3bb9ac3d8160"><block><txt break.before="1">The design and construction of the jetty or pier is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.54-tble2-para1.a" guid="_2fd1da9d-4504-4126-bbe7-08d905b0bf2f" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.54-tble2-para1.b" target.guid="_1c0df650-12ae-4e3b-911a-4da36fbfcb9d" check="valid">paragraph&#160;(b)</intref>, either—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.54-tble2-para1.a-para2.i" guid="_83050fcb-0d09-4094-b603-558f7cc809da" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">the level of the deck of the jetty or pier is at least 300mm above the water at highest astronomical tide; or</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.54-tble2-para1.a-para2.ii" guid="_840462da-4e71-4475-be61-28d9e3f43353" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">piles or other markers indicate the presence of the jetty or pier when the jetty or pier is less than 300mm above the water at highest astronomical tide;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.54-tble2-para1.b" guid="_1c0df650-12ae-4e3b-911a-4da36fbfcb9d" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.54-tble2-para1.a" target.guid="_2fd1da9d-4504-4126-bbe7-08d905b0bf2f" check="valid">paragraph&#160;(a)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.54-tble2-para1.a" target.guid="_2fd1da9d-4504-4126-bbe7-08d905b0bf2f" check="valid">paragraph&#160;(a)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.55" guid="_651fd8a9-c01c-4ffc-9723-6b915bcfdc34"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.55-tble1" guid="_52e48e11-3ac1-4736-ba65-0538e86f8aed"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.55-tble1-para1.16.3" guid="_008192db-259f-4cc8-8dba-ab6cad428ba2" affected.by.uncommenced="0"><no>16.3</no><block><txt break.before="1">Prescribed tidal works that are a jetty or pier and for a private purpose and are on State tidal land are designed and constructed in a way to ensure the jetty or pier is of a size suitable for the use of a vessel while still minimising the amount of tidal water occupied by the jetty or pier.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.55-tble2" guid="_5414ea20-fa30-4591-b26c-76057b12ece8"><block><txt break.before="1">(s 5(2) outcome)</txt></block><block><txt break.before="1">The design and construction of the jetty or pier is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.55-tble2-para1.a" guid="_0ac20364-5b87-411e-8e79-931246982d58" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.55-tble2-para1.b" target.guid="_b0376163-d77a-4484-8d3d-64d7c6850c7e" check="valid">paragraph&#160;(b)</intref>—</txt><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.55-tble2-para1.a-para2.i" guid="_e8ae2581-8e45-4095-be18-4a5b51b51adf" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">all parts of the deck of the jetty or pier have a width of at least 900mm and not more than 3m; and</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.55-tble2-para1.a-para2.ii" guid="_85da7122-4f69-4789-97f6-6beb4c2928f6" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">all parts of the jetty or pier are within a water allocation area for the lot connected to the jetty or pier;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.55-tble2-para1.b" guid="_b0376163-d77a-4484-8d3d-64d7c6850c7e" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.55-tble2-para1.a" target.guid="_0ac20364-5b87-411e-8e79-931246982d58" check="valid">paragraph&#160;(a)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.55-tble2-para1.a" target.guid="_0ac20364-5b87-411e-8e79-931246982d58" check="valid">paragraph&#160;(a)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.56" guid="_48263a2d-7817-484a-ac54-abd9db5a5e02"><entry namest="1" nameend="2" align="center" valign="top" id="sch.3-pt.3-tbl-tblr-oc.56-tble1" guid="_4059f57c-8c17-40a6-8095-97c1b4bf54bd"><block><txt break.before="1">Design, construction and safety—pipelines and other underground services</txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.57" guid="_55e1c47b-b7fb-455f-9e43-23829b66ce43"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.57-tble1" guid="_a41f9846-f0cc-49ce-93e1-0f81e1e9d096"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.57-tble1-para1.17.1" guid="_b033e7e2-7e73-48a4-849f-eb1977cad897" affected.by.uncommenced="0"><no>17.1</no><block><txt break.before="1">The design and construction of prescribed tidal works that are a pipeline or another underground service ensures vessels anchoring near the works can not interfere with, or damage, the works.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.57-tble2" guid="_45818475-4a82-4fb2-a3a1-2a7298d745ad"><block><txt break.before="1">(s 5(2) outcome)</txt></block><block><txt break.before="1">The design and construction of the pipeline or underground service is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.57-tble2-para1.a" guid="_f668ac79-b730-4a7f-b137-cabf484af1b5" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.57-tble2-para1.b" target.guid="_be7bf311-de9d-46e9-a4c8-6c8c6bd95e15" check="valid">paragraph&#160;(b)</intref>—</txt><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.57-tble2-para1.a-para2.i" guid="_69a09eda-e944-4d9e-808f-7fb7506a7a17" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">for a pipeline that is gas or liquid petroleum pipeline—AS/NZS 2885 to the extent requirements stated in the Standard apply to the design or construction of the pipeline; or</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.57-tble2-para1.a-para2.ii" guid="_7574c075-21f9-4656-9fb2-2a33b5e1ce7d" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">for another pipeline or other underground service—the pipeline or service is installed at least 1.2m below the surface of land, after it is installed;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.57-tble2-para1.b" guid="_be7bf311-de9d-46e9-a4c8-6c8c6bd95e15" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.57-tble2-para1.a" target.guid="_f668ac79-b730-4a7f-b137-cabf484af1b5" check="valid">paragraph&#160;(a)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.57-tble2-para1.a" target.guid="_f668ac79-b730-4a7f-b137-cabf484af1b5" check="valid">paragraph&#160;(a)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.58" guid="_f5c63f22-edb7-4dc4-a6ce-ed2becc6a66c"><entry namest="1" nameend="2" align="center" valign="top" id="sch.3-pt.3-tbl-tblr-oc.58-tble1" guid="_df194ef7-b170-42fb-9483-6b09b8ed07c3"><block><txt break.before="1">Design, construction and safety—pontoons</txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.59" guid="_aa1bdd2d-b321-427f-8a0e-fd92564d01e3"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.59-tble1" guid="_761d3ccd-70fc-4c8b-8565-2d89e52b0c21"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.59-tble1-para1.18.1" guid="_ed5d2c7e-8cfc-451e-abce-c49c733e1e35" affected.by.uncommenced="0"><no>18.1</no><block><txt break.before="1">Prescribed tidal works that are a pontoon and not used only for rowing, are designed and constructed in a way to ensure the pontoon is able to support its intended loads, having regard to its relevant loading matters.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.59-tble2" guid="_83ce9886-a797-4c23-be37-61f9a208d27d"><block><txt break.before="1">(s 5(2) outcome)</txt></block><block><txt break.before="1">The design and construction of the pontoon is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.59-tble2-para1.a" guid="_10b375be-bcca-40d9-922b-f5d5c19bfbde" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.59-tble2-para1.b" target.guid="_2fbffdf8-c3f1-431e-9f03-880eab01c9fd" check="valid">paragraph&#160;(b)</intref>, each of the following Australian Standards to the extent requirements stated in the Standard apply to relevant loading matters for the design or construction of the pontoon—</txt><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.59-tble2-para1.a-para2.i" guid="_5e92c731-0ef9-40c1-80e4-b0538e306a9f" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">AS/NZS 1170.0;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.59-tble2-para1.a-para2.ii" guid="_f9eae579-3009-4d67-bca1-eefd72830cd5" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">AS/NZS 1170.1;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.59-tble2-para1.a-para2.iii" guid="_0ff14d89-5b58-43df-864f-b357233645e2" affected.by.uncommenced="0"><no>(iii)</no><block><txt break.before="1">AS/NZS 1170.2;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.59-tble2-para1.a-para2.iv" guid="_093c6c39-eeb3-4e92-8761-d40e54f05910" affected.by.uncommenced="0"><no>(iv)</no><block><txt break.before="1">AS 1170.4;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.59-tble2-para1.a-para2.v" guid="_b1585743-9fab-47ac-afcd-315e5f4a2e7b" affected.by.uncommenced="0"><no>(v)</no><block><txt break.before="1">AS 3962;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.59-tble2-para1.a-para2.vi" guid="_1e24fef8-6eab-4168-bfd4-12c0d17876b8" affected.by.uncommenced="0"><no>(vi)</no><block><txt break.before="1">AS 4997;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.59-tble2-para1.b" guid="_2fbffdf8-c3f1-431e-9f03-880eab01c9fd" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.59-tble2-para1.a" target.guid="_10b375be-bcca-40d9-922b-f5d5c19bfbde" check="valid">paragraph&#160;(a)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.59-tble2-para1.a" target.guid="_10b375be-bcca-40d9-922b-f5d5c19bfbde" check="valid">paragraph&#160;(a)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.60" guid="_9792be21-81c7-42e6-b898-6153d6c694bb"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.60-tble1" guid="_8f6f363c-d724-454b-964a-e42ddd153b81"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.60-tble1-para1.18.2" guid="_a873f3bb-6d74-435f-99e4-441f30b69515" affected.by.uncommenced="0"><no>18.2</no><block><txt break.before="1">Prescribed tidal works that are a pontoon and used only for rowing are designed and constructed in a way to ensure—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.60-tble1-para1.18.2-para2.a" guid="_16c8ac9c-222a-4c66-827e-40211128f051" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">the pontoon is able to support its intended loads, having regard to its relevant loading matters; and</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.60-tble1-para1.18.2-para2.b" guid="_9085bd62-230b-4336-9935-0884da2dbcaa" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">the pontoon is safe for persons using the pontoon to launch and retrieve rowing vessels.</txt></block></tli></tlist></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.60-tble2" guid="_f1c0e45b-f39f-494f-81f5-c33657ff8d8e"><block><txt break.before="1">(s 5(2) outcome)</txt></block><block><txt break.before="1">The design and construction of the pontoon is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.60-tble2-para1.a" guid="_0505fa4a-bf81-4a10-84ff-ab1c25b9b520" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.60-tble2-para1.b" check="invalid">paragraph&#160;(b)</intref>—</txt><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.60-tble2-para1.a-para2.i" guid="_15b8568f-c6e6-4423-bc04-9ade18c2958c" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">for a pontoon constructed within a marina—AS 3962 to the extent requirements stated in the Standard apply to relevant loading matters for the design or construction of the pontoon; or</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.60-tble2-para1.a-para2.ii" guid="_320582c3-ed62-4fb2-b68a-362516fba79a" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">for a pontoon not constructed within a marina—</txt><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.60-tble2-para1.a-para2.ii-para3.A" guid="_c748d2d3-0820-4388-9f2e-4038c97f3a22" affected.by.uncommenced="0"><no>(A)</no><block><txt break.before="1">the access walkway of a pontoon used only for rowing is able to support at least a live load of 3.0kPa; and</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.60-tble2-para1.a-para2.ii-para3.B" guid="_09f6c38c-9198-4c20-aa82-87bd5e05dd32" affected.by.uncommenced="0"><no>(B)</no><block><txt break.before="1">the flotation unit of a pontoon used only for rowing is able to support at least a live load of 1.5kPa; and</txt></block></tli></tlist></block></tli></tlist></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.61" guid="_92dcc4de-2cba-4928-8ce4-6ccb5b835a7c"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.61-tble1" guid="_95c16a24-0831-41d3-ba1f-89f23d8617df"><block><txt break.before="1"/></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.61-tble2" guid="_756bec5b-4c6d-4d19-a306-d283cd8837bb"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.61-tble2-para1" guid="_5c257381-3669-4a80-88b6-8c6fbf323294" affected.by.uncommenced="0"><no/><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.61-tble2-para1-para2" guid="_99a40120-5f62-459f-966f-2806f40abd98" affected.by.uncommenced="0"><no/><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.61-tble2-para1-para2-para3.C" guid="_5b341a4b-2b9f-41eb-ac35-39b669eaf87f" affected.by.uncommenced="0"><no>(C)</no><block><txt break.before="1">at least 75mm of the height of the pontoon’s flotation unit will remain above the surface of the water over which it is constructed if a distributed live load is applied to half of the surface of the pontoon’s flotation unit and all of the surface of the pontoon’s access walkway;</txt></block></tli></tlist></block></tli></tlist></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.61-tble2-para1.b" guid="_c37ac3f3-e784-460c-a612-379cf4ce42c2" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.61-tble2-para1.a" check="invalid">paragraph&#160;(a)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.61-tble2-para1.a" check="invalid">paragraph&#160;(a)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.62" guid="_e7ebd571-5e8d-41fb-a0bd-c3b4b1df792d"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.62-tble1" guid="_8dba4e3d-2c72-48b7-bb49-250741ed7f12"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.62-tble1-para1.18.3" guid="_2b641d98-20aa-4180-9863-74c8264e359f" affected.by.uncommenced="0"><no>18.3</no><block><txt break.before="1">Prescribed tidal works that are a pontoon are designed and constructed in a way to ensure any load applied to the pontoon by a person or thing on the pontoon does not cause the pontoon to tip over or tilt to a degree causing the person or thing to fall off the pontoon.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.62-tble2" guid="_b7fa02f2-ab2e-4d87-95b4-03b211d4449a"><block><txt break.before="1">(s 5(2) outcome)</txt></block><block><txt break.before="1">The design and construction of the pontoon is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.62-tble2-para1.a" guid="_76820774-02bd-48e5-bb6f-d54b3e70c8d0" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.62-tble2-para1.b" check="invalid">paragraph&#160;(b)</intref>—</txt><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.62-tble2-para1.a-para2.i" guid="_420d7c04-1fcf-4808-a3a1-27178d0dcf4b" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">for a pontoon constructed within a marina—AS 3962 to the extent requirements stated in the Standard apply to relevant loading matters for the design or construction of the pontoon; or</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.62-tble2-para1.a-para2.ii" guid="_b0e11332-49ef-4d14-9447-f4899b4505cd" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">for a pontoon not constructed within a marina—</txt><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.62-tble2-para1.a-para2.ii-para3.A" guid="_4153e8cb-ae31-41c4-b08b-5909754520ac" affected.by.uncommenced="0"><no>(A)</no><block><txt break.before="1">the pontoon’s access walkway extends at least 500mm onto the pontoon’s flotation unit; and</txt></block></tli></tlist></block></tli></tlist></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.63" guid="_0ffacf23-603b-4c12-b6c8-dedee01e7867"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.63-tble1" guid="_30bccdd1-332e-437a-92b6-7544006872f8"><block><txt break.before="1"/></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.63-tble2" guid="_bdb4b818-5fb3-4e24-8065-01d40842da4f"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.63-tble2-para1" guid="_4fdabfee-d078-4cb5-b7a6-ea7b4c0c763f" affected.by.uncommenced="0"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.63-tble2-para1-para2" guid="_eb853637-27bb-481a-9a07-40aa61343c01" affected.by.uncommenced="0"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.63-tble2-para1-para2-para3.B" guid="_99be78ff-97a1-4534-9ce2-6d24f61deb3d" affected.by.uncommenced="0"><no>(B)</no><block><txt break.before="1">for a pontoon used only for rowing—at least 75mm of the height of the pontoon’s flotation unit remains above the water over which it is constructed if a distributed live load is applied to half of the surface of the pontoon’s flotation unit and all of the surface of the pontoon’s access walkways; and</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.63-tble2-para1-para2-para3.C" guid="_7481165d-002c-43ab-aba5-627809ca1d2b" affected.by.uncommenced="0"><no>(C)</no><block><txt break.before="1">for a pontoon other than a pontoon mentioned in sub-subparagraph (B)—the top surface of the pontoon’s flotation unit remains above the water over which it is constructed if a distributed live load of 1.5kPa is applied to half of the surface of the pontoon’s flotation unit and all of the surface of the pontoon’s access walkways; and</txt></block></tli></tlist></block></tli></tlist></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.64" guid="_0601830f-113b-4050-b4f4-7d98c4f12294"><entry colname="1" id="sch.3-pt.3-tbl-tblr-oc.64-tble1" guid="_73d002b3-6e5c-4d36-8b08-ceb6a5f7f95f"/><entry colname="2" id="sch.3-pt.3-tbl-tblr-oc.64-tble2" guid="_10bfaeab-c2ee-4e95-8472-119f3791e5a5"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.64-tble2-para1" guid="_6136b2ae-184f-41f4-ad0b-02c058fb64f6" affected.by.uncommenced="0"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.64-tble2-para1-para2" guid="_e20a05bf-2a02-46de-aa2e-f409cbc8dbd8" affected.by.uncommenced="0"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.64-tble2-para1-para2-para3.D" guid="_97cad731-1e7c-4b9e-a66a-19034076a371" affected.by.uncommenced="0"><no>(D)</no><block align="left"><txt break.before="1">the whole base of the pontoon’s flotation unit remains in contact with the water over which it is constructed at all times and tilts no more than 15&#186; at any time;</txt></block></tli></tlist></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.64-tble2-para1.b" guid="_6208b8b2-bf4c-4710-a388-6f3ea82c02a7" affected.by.uncommenced="0"><no>(b)</no><block align="left"><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.64-tble2-para1.a" check="invalid">paragraph&#160;(a)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.64-tble2-para1.a" check="invalid">paragraph&#160;(a)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.65" guid="_1d4d7b52-045a-44e8-ac04-56528348a07c"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.65-tble1" guid="_4911a800-880a-43f3-997c-1e75c5573311"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.65-tble1-para1.18.4" guid="_2c72d2b9-916c-46e1-8851-f43ec2026051" affected.by.uncommenced="0"><no>18.4</no><block><txt break.before="1">Prescribed tidal works that are a pontoon are designed and constructed in a way to ensure the pontoon’s flotation unit will—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.65-tble1-para1.18.4-para2.a" guid="_f8664de7-1872-4b24-9ffb-159327bc1419" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">rise and fall to allow for a change in tidal water levels, including a change caused by a flood or storm tide; and</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.65-tble1-para1.18.4-para2.b" guid="_dcfc6a78-674b-4122-9535-58e2b8132d01" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">not be separated from the lot to which the pontoon is connected because of—</txt><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.65-tble1-para1.18.4-para2.b-para3.i" guid="_66a5f405-20e6-4499-8be1-6cbd967286c2" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">a change in tidal water levels mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.65-tble1-para1.a" check="invalid">paragraph&#160;(a)</intref>; or</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.65-tble1-para1.18.4-para2.b-para3.ii" guid="_ed724ad0-a564-4bb0-b0fa-f57453490bd7" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">the flow of tidal water around the pontoon, including tidal water affected by a flood or storm tide.</txt></block></tli></tlist></block></tli></tlist></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.65-tble2" guid="_27d691d3-7288-4762-bc77-99cf7baf0917"><block><txt break.before="1">The design and construction of the pontoon is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.65-tble2-para1.a" guid="_44060a83-541f-4ee1-97cb-79d9d3f0b871" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.65-tble2-para1.c" target.guid="_6542939e-2cdc-45c6-a49d-b00e5951c2a8" check="valid">paragraph&#160;(c)</intref>, the pontoon’s flotation unit is—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.65-tble2-para1.a-para2.i" guid="_d9247d3a-01a2-432d-bf1f-353765ccd71d" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">attached, through the pontoon’s system for mooring the unit, to concrete anchors in the bank landward of the pontoon; or</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.65-tble2-para1.a-para2.ii" guid="_4d027d2d-5424-418b-8252-105ad670bc1f" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">moored by piles;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.65-tble2-para1.b" guid="_f1601ec3-6647-4138-b8f5-bd8559f5e859" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.65-tble2-para1.c" target.guid="_6542939e-2cdc-45c6-a49d-b00e5951c2a8" check="valid">paragraph&#160;(c)</intref>, if a tidal water level change resulting from a flood or storm tide with an AEP of 1% would cause a pontoon’s flotation unit to detach from the system for mooring the unit—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.65-tble2-para1.b-para2.i" guid="_702b2b20-e575-4454-a072-a1c0f8c61b09" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">the standard applying under <intref refid="sch.3-pt.3-tbl-tblr-oc.65-tble2-para1.a" target.guid="_44060a83-541f-4ee1-97cb-79d9d3f0b871" check="valid">paragraph&#160;(a)</intref>; and</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.65-tble2-para1.b-para2.ii" guid="_22215c6d-9365-4917-a2fa-3cd6462e1c65" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">the pontoon’s flotation unit is restrained with a tethering system so that it can withstand the effects of the event;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.65-tble2-para1.c" guid="_6542939e-2cdc-45c6-a49d-b00e5951c2a8" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.65-tble2-para1.a" target.guid="_44060a83-541f-4ee1-97cb-79d9d3f0b871" check="valid">paragraph&#160;(a)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.65-tble2-para1.b" target.guid="_f1601ec3-6647-4138-b8f5-bd8559f5e859" check="valid">(b)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.65-tble2-para1.a" target.guid="_44060a83-541f-4ee1-97cb-79d9d3f0b871" check="valid">paragraph&#160;(a)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.65-tble2-para1.b" target.guid="_f1601ec3-6647-4138-b8f5-bd8559f5e859" check="valid">(b)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.66" guid="_2e305682-0452-43e8-90f2-46e6de7456f0"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.66-tble1" guid="_03cf0ae3-767e-41d6-ae9c-d5f46a5c6cfe"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.66-tble1-para1.18.5" guid="_32546d89-9e03-4837-8185-07b4f42b73b8" affected.by.uncommenced="0"><no>18.5</no><block><txt break.before="1">Prescribed tidal works that are a pontoon identifies the lot to which the pontoon is connected.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.66-tble2" guid="_fdadccdb-3f0d-4a14-a377-327f1015dff2"><block><txt break.before="1">The design and construction of the pontoon is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.66-tble2-para1.a" guid="_c9b9e843-ec5e-4dac-adb8-a9382778b70c" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">a label that identifies the lot to which the pontoon is connected is written or stamped on, or fixed to, the outside of the pontoon’s flotation unit;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.66-tble2-para1.b" guid="_f32bfa84-b954-43e0-8d36-6d5e377db552" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.66-tble2-para1.a" target.guid="_c9b9e843-ec5e-4dac-adb8-a9382778b70c" check="valid">paragraph&#160;(a)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.66-tble2-para1.a" target.guid="_c9b9e843-ec5e-4dac-adb8-a9382778b70c" check="valid">paragraph&#160;(a)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.67" guid="_39673a03-0873-4ea4-90f1-a021adde987b"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.67-tble1" guid="_311de2f9-e569-4d29-8860-6ee9872df797"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.67-tble1-para1.18.6" guid="_f2a025a2-2ad5-4dec-a8c4-975a6526b077" affected.by.uncommenced="0"><no>18.6</no><block><txt break.before="1">Prescribed tidal works that are a pontoon permanently used for the fuelling of, or the storage of fuel for, vessels are designed and constructed in a way to ensure—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.67-tble1-para1.18.6-para2.a" guid="_6b17e4ac-f45a-4f2c-8335-c8f788e061d6" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">the pontoon is able to support its intended loads, having regard to its relevant loading matters; and</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.67-tble1-para1.18.6-para2.b" guid="_ba795d6b-af86-4f69-847e-3f2944f6ee46" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">the pontoon is safe for persons using the pontoon.</txt></block></tli></tlist></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.67-tble2" guid="_3d087a22-c095-4863-958e-e8df66a4e598"><block><txt break.before="1">(s 5(2) outcome)</txt></block><block><txt break.before="1">The design and construction of the pontoon is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.67-tble2-para1.a" guid="_a83d8d38-a829-4258-b7e1-ba28eaa02a09" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.67-tble2-para1.c" target.guid="_1ca7e6c3-9a90-4f39-afaa-77bc2aa8c125" check="valid">paragraph&#160;(c)</intref>, each of the following Australian Standards to the extent requirements stated in the Standard apply to relevant loading matters for the design or construction of the pontoon—</txt><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.67-tble2-para1.a-para2.i" guid="_3e9ae1a2-f072-40d0-8ff4-ecfdede8fe38" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">AS/NZS 1170.0;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.67-tble2-para1.a-para2.ii" guid="_8a93d1fc-a0e9-4bf4-92a9-67d53b7d3195" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">AS/NZS 1170.1;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.67-tble2-para1.a-para2.iii" guid="_9c1bdc99-2ca9-45f4-9ac7-c55cd302c7ed" affected.by.uncommenced="0"><no>(iii)</no><block><txt break.before="1">AS/NZS 1170.2;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.67-tble2-para1.a-para2.iv" guid="_a045d419-db58-495f-9cb5-c368a74f5543" affected.by.uncommenced="0"><no>(iv)</no><block><txt break.before="1">AS 1170.4;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.67-tble2-para1.a-para2.v" guid="_16c255e0-7bb8-46a2-8188-6e7d36c87a71" affected.by.uncommenced="0"><no>(v)</no><block><txt break.before="1">AS 4997;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.67-tble2-para1.b" guid="_c5db2707-03cd-4046-bc5f-023932cfa664" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.67-tble2-para1.c" target.guid="_1ca7e6c3-9a90-4f39-afaa-77bc2aa8c125" check="valid">paragraph&#160;(c)</intref>, AS&#160;3962 to the extent requirements stated in the Standard apply to a pontoon permanently used for the fuelling of, or the storage of fuel;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.67-tble2-para1.c" guid="_1ca7e6c3-9a90-4f39-afaa-77bc2aa8c125" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.67-tble2-para1.a" target.guid="_a83d8d38-a829-4258-b7e1-ba28eaa02a09" check="valid">paragraph&#160;(a)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.67-tble2-para1.b" target.guid="_c5db2707-03cd-4046-bc5f-023932cfa664" check="valid">(b)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.67-tble2-para1.a" target.guid="_a83d8d38-a829-4258-b7e1-ba28eaa02a09" check="valid">paragraph&#160;(a)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.67-tble2-para1.b" target.guid="_c5db2707-03cd-4046-bc5f-023932cfa664" check="valid">(b)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.68" guid="_a0144e71-2821-4d3a-ae7d-75b659419ea0"><entry namest="1" nameend="2" align="center" valign="top" id="sch.3-pt.3-tbl-tblr-oc.68-tble1" guid="_76dfef11-ce51-4709-8536-7c5a2aefaf50"><block><txt break.before="1">Design, construction and safety—revetments and seawalls</txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.69" guid="_6ba61940-7852-48e6-aa43-496f34fda067"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.69-tble1" guid="_05fa6536-5e0c-47a5-87ef-3ed0ecd9205c"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.69-tble1-para1.19.1" guid="_d4539d55-17d4-4d9c-b87b-53a18b90d601" affected.by.uncommenced="0"><no>19.1</no><block><txt break.before="1">Prescribed tidal works that are a revetment or seawall, are designed and constructed in a way to ensure the revetment or seawall is able to support its intended loads, having regard to its relevant loading matters and its intended design life.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.69-tble2" guid="_1c5e2f7d-2da1-4f50-b2ed-8d583a420895"><block><txt break.before="1">(s 5(2) outcome)</txt></block><block><txt break.before="1">The design and construction of the revetment or seawall is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.69-tble2-para1.a" guid="_1920a458-b013-43ad-933a-4247e4ad41c2" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.69-tble2-para1.c" target.guid="_d1270f11-73c6-4db5-85b9-bf2b1d91055f" check="valid">paragraph&#160;(c)</intref>, each of the following Australian Standards to the extent requirements stated in the Standard apply to relevant loading matters for the design or construction of the revetment or seawall—</txt><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.69-tble2-para1.a-para2.i" guid="_19809055-fd17-4294-aac3-fd6ee748b784" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">AS/NZS 1170.0;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.69-tble2-para1.a-para2.ii" guid="_bbf2dff2-a0bd-4dab-b8c4-70ed11aac465" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">AS/NZS 1170.1;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.69-tble2-para1.a-para2.iii" guid="_637f40c2-69ad-4e38-bcec-28361564b081" affected.by.uncommenced="0"><no>(iii)</no><block><txt break.before="1">AS/NZS 1170.2;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.69-tble2-para1.a-para2.iv" guid="_beba6b35-130d-478d-bc4b-549fd867b32c" affected.by.uncommenced="0"><no>(iv)</no><block><txt break.before="1">AS 1170.4;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.69-tble2-para1.a-para2.v" guid="_a28c090c-a2c9-454d-a8d7-db749ab04659" affected.by.uncommenced="0"><no>(v)</no><block><txt break.before="1">AS 4997;</txt></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.69-tble2-para1.b" guid="_a7f3d1ce-118e-4167-90f5-6d39f1fa3378" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.69-tble2-para1.c" target.guid="_d1270f11-73c6-4db5-85b9-bf2b1d91055f" check="valid">paragraph&#160;(c)</intref>, AS&#160;4678 to the extent requirements stated in the Standard apply to earth-retaining structures;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.69-tble2-para1.c" guid="_d1270f11-73c6-4db5-85b9-bf2b1d91055f" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.69-tble2-para1.a" target.guid="_1920a458-b013-43ad-933a-4247e4ad41c2" check="valid">paragraph&#160;(a)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.69-tble2-para1.b" target.guid="_a7f3d1ce-118e-4167-90f5-6d39f1fa3378" check="valid">(b)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.69-tble2-para1.a" target.guid="_1920a458-b013-43ad-933a-4247e4ad41c2" check="valid">paragraph&#160;(a)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.69-tble2-para1.b" target.guid="_a7f3d1ce-118e-4167-90f5-6d39f1fa3378" check="valid">(b)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.70" guid="_b59fb50c-0fa5-41d9-bf15-0165f2b7028c"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.70-tble1" guid="_2f29f4c6-7232-46c0-ab39-e79bfddac164"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.70-tble1-para1.19.2" guid="_4784c850-70ff-495e-99aa-0ef3bafe2744" affected.by.uncommenced="0"><no>19.2</no><block><txt break.before="1">Prescribed tidal works that are a revetment or seawall, are designed and constructed in a way to ensure the revetment or seawall can withstand—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.70-tble1-para1.19.2-para2.a" guid="_859749b5-f7ad-4969-94c6-9ac811e5073b" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">any tendency of overturning or sliding; and</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.70-tble1-para1.19.2-para2.b" guid="_9f1dc9a1-7aa2-42a0-8bfa-5b1e121525ba" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">any other effects of waves or changes in water levels on the revetment or seawall.</txt></block></tli></tlist></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.70-tble2" guid="_95f81392-6b25-4450-a2ce-a4edabde715e"><block><txt break.before="1">(s 5(2) outcome)</txt></block><block><txt break.before="1">The design and construction of the revetment or seawall is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.70-tble2-para1.a" guid="_40e8daac-66c2-4b18-8bfc-0f8436facbb2" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.70-tble2-para1.d" check="invalid">paragraph&#160;(d)</intref>, a revetment or seawall is able to withstand the effect of waves, or a combination of waves and water levels, resulting from a storm event with an AEP of 2%, factoring in projected sea level rise;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.70-tble2-para1.b" guid="_2f2f854c-b774-4acd-96f6-fb5a5f998276" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.70-tble2-para1.d" check="invalid">paragraph&#160;(d)</intref>, each of the following Australian Standards to the extent requirements stated in the Standard apply to relevant loading matters for the design or construction of the revetment or seawall—</txt><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.70-tble2-para1.b-para2.i" guid="_615dbd91-b6be-4a87-91d2-c3a5f3b438e9" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">AS/NZS 1170.0;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.70-tble2-para1.b-para2.ii" guid="_510383e0-695a-4f8d-9081-46795cb1e6ee" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">AS/NZS 1170.1;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.70-tble2-para1.b-para2.iii" guid="_55a6bb5b-3ea8-44c5-a884-9afa9d47dea8" affected.by.uncommenced="0"><no>(iii)</no><block><txt break.before="1">AS/NZS 1170.2;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.70-tble2-para1.b-para2.iv" guid="_2dbb2bbb-1a6d-4c24-bc63-9c36e1b11ba2" affected.by.uncommenced="0"><no>(iv)</no><block><txt break.before="1">AS 1170.4;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.70-tble2-para1.b-para2.v" guid="_42e1b4be-3e80-4feb-bed5-a87c0a227c6b" affected.by.uncommenced="0"><no>(v)</no><block><txt break.before="1">AS 4997;</txt></block></tli></tlist></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.71" guid="_deec9c0d-3e83-4f4c-88ba-4923c453815c"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.71-tble1" guid="_116e341f-fbe3-42cb-9084-5795b185896a"><block><txt break.before="1"/></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.71-tble2" guid="_2294b9d1-dd6a-430a-b937-4c7f584d44db"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.71-tble2-para1.c" guid="_36336a6b-0beb-4e0e-84e4-6bc78dc1e62a" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.71-tble2-para1.d" target.guid="_c8df7726-af99-4c23-b815-46235ae6bc16" check="valid">paragraph&#160;(d)</intref>, AS&#160;4678 to the extent requirements stated in the Standard apply to earth-retaining structures;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.71-tble2-para1.d" guid="_c8df7726-af99-4c23-b815-46235ae6bc16" affected.by.uncommenced="0"><no>(d)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.71-tble2-para1.a" check="invalid">paragraph&#160;(a)</intref>, <intref refid="sch.3-pt.3-tbl-tblr-oc.71-tble2-para1.b" check="invalid">(b)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.71-tble2-para1.c" target.guid="_36336a6b-0beb-4e0e-84e4-6bc78dc1e62a" check="valid">(c)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.71-tble2-para1.a" check="invalid">paragraph&#160;(a)</intref>, <intref refid="sch.3-pt.3-tbl-tblr-oc.71-tble2-para1.b" check="invalid">(b)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.71-tble2-para1.c" target.guid="_36336a6b-0beb-4e0e-84e4-6bc78dc1e62a" check="valid">(c)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.72" guid="_88e04dac-a331-43c6-ae40-172b8c4dfa1e"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.72-tble1" guid="_f03b5375-6c2a-402c-b3c5-a8d2436c6fdd"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.72-tble1-para1.19.3" guid="_a716fe8b-8b2b-4ad4-bed9-6a47aac320ab" affected.by.uncommenced="0"><no>19.3</no><block><txt break.before="1">Prescribed tidal works that are a revetment or seawall are designed and constructed to protect the revetment or seawall from erosion at the base of the revetment or seawall.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.72-tble2" guid="_7e36f269-8c1c-40a3-aca5-88c76c90b41c"><block><txt break.before="1">(s 5(2) outcome)</txt></block><block><txt break.before="1">The design and construction of the revetment or seawall is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.72-tble2-para1.a" guid="_67170f61-e43f-45c8-9afb-2799ae45e1f1" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.72-tble2-para1.d" target.guid="_a8203cf7-75cc-461f-851c-aa13999f3284" check="valid">paragraph&#160;(d)</intref>, a revetment or seawall provides for a sub-layer or enough filter material to prevent erosion of the land under the revetment or seawall;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.72-tble2-para1.b" guid="_d5071226-bc48-4add-836d-e8221ec9251a" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.72-tble2-para1.d" target.guid="_a8203cf7-75cc-461f-851c-aa13999f3284" check="valid">paragraph&#160;(d)</intref>, the bottom edge of the base of a revetment or seawall will withstand undermining by scour;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.72-tble2-para1.c" guid="_0efcb0ef-4e40-4c64-8140-204ea27cbda8" affected.by.uncommenced="0"><no>(c)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.72-tble2-para1.d" target.guid="_a8203cf7-75cc-461f-851c-aa13999f3284" check="valid">paragraph&#160;(d)</intref>, AS&#160;2758 to the extent requirements stated in the Standard apply to the sizing and grading of filter layers and armour materials;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.72-tble2-para1.d" guid="_a8203cf7-75cc-461f-851c-aa13999f3284" affected.by.uncommenced="0"><no>(d)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.72-tble2-para1.a" target.guid="_67170f61-e43f-45c8-9afb-2799ae45e1f1" check="valid">paragraph&#160;(a)</intref>, <intref refid="sch.3-pt.3-tbl-tblr-oc.72-tble2-para1.b" target.guid="_d5071226-bc48-4add-836d-e8221ec9251a" check="valid">(b)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.72-tble2-para1.c" target.guid="_0efcb0ef-4e40-4c64-8140-204ea27cbda8" check="valid">(c)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.72-tble2-para1.a" target.guid="_67170f61-e43f-45c8-9afb-2799ae45e1f1" check="valid">paragraph&#160;(a)</intref>, <intref refid="sch.3-pt.3-tbl-tblr-oc.72-tble2-para1.b" target.guid="_d5071226-bc48-4add-836d-e8221ec9251a" check="valid">(b)</intref> or <intref refid="sch.3-pt.3-tbl-tblr-oc.72-tble2-para1.c" target.guid="_0efcb0ef-4e40-4c64-8140-204ea27cbda8" check="valid">(c)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.73" guid="_d4694029-4827-4cc0-8a01-fe26f1627be2"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.73-tble1" guid="_84613a1e-ea8e-4967-bad1-3189ae66e674"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.73-tble1-para1.19.4" guid="_0c066143-fc04-43e3-8247-d873f1fb7643" affected.by.uncommenced="0"><no>19.4</no><block><txt break.before="1">Prescribed tidal works that are a revetment or seawall are not adversely affected by hydrostatic pressure.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.73-tble2" guid="_d0681437-ec85-4ef2-8613-048b747797da"><block><txt break.before="1">The design and construction of the revetment or seawall is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.73-tble2-para1.a" guid="_4f9131bb-b20b-4a5f-b47e-0493168b6323" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.73-tble2-para1.b" target.guid="_18ffb33d-3d9d-42f2-a8c0-4ab6f612ab50" check="valid">paragraph&#160;(b)</intref>, AS&#160;4678 to the extent requirements stated in the Standard apply to hydrostatic pressure for earth-retaining structures;</txt></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.73-tble2-para1.b" guid="_18ffb33d-3d9d-42f2-a8c0-4ab6f612ab50" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.73-tble2-para1.a" target.guid="_4f9131bb-b20b-4a5f-b47e-0493168b6323" check="valid">paragraph&#160;(a)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.73-tble2-para1.a" target.guid="_4f9131bb-b20b-4a5f-b47e-0493168b6323" check="valid">paragraph&#160;(a)</intref>.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.74" guid="_c5d90187-96f6-4c3f-9e4b-9c9874538aae"><entry namest="1" nameend="2" align="center" valign="top" id="sch.3-pt.3-tbl-tblr-oc.74-tble1" guid="_ab403c39-a3a1-467e-9328-b920a7b9e7fb"><block><txt break.before="1">Design, construction and safety—wharves</txt></block></entry></row><row rowsep="1" id="sch.3-pt.3-tbl-tblr-oc.75" guid="_66511b20-9fbb-4ba5-87f9-d3ab6cf8e864"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.75-tble1" guid="_e18232f0-16f2-4bae-9bfa-4455f5b55175"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.75-tble1-para1.20.1" guid="_08b9ef79-d08f-456f-b56a-c2e25a15ccc2" affected.by.uncommenced="0"><no>20.1</no><block><txt break.before="1">Prescribed tidal works that are a wharf are designed and constructed in a way to ensure it is able to support its intended loads, having regard to its relevant loading matters.</txt></block></tli></tlist></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.75-tble2" guid="_04a2c6c3-450f-42e9-900c-997bcb8994e4"><block><txt break.before="1">(s 5(2) outcome)</txt></block><block><txt break.before="1">The design and construction of the wharf is consistent with the following standards—</txt></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.75-tble2-para1.a" guid="_c3b263a4-3ca3-4747-9133-5d06528193c0" affected.by.uncommenced="0"><no>(a)</no><block><txt break.before="1">subject to <intref refid="sch.3-pt.3-tbl-tblr-oc.75-tble2-para1.b" check="invalid">paragraph&#160;(b)</intref>—</txt><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.75-tble2-para1.a-para2.i" guid="_dcffd8e5-ed79-4f65-af43-0736e105fd6e" affected.by.uncommenced="0"><no>(i)</no><block><txt break.before="1">for a wharf constructed within a marina—AS&#160;3962 to the extent requirements stated in the Standard apply to relevant loading matters for the design or construction of the wharf; or</txt></block></tli></tlist></block></tli></tlist></block></entry></row><row rowsep="0" id="sch.3-pt.3-tbl-tblr-oc.76" guid="_c9496369-41d3-4889-8abb-098009eee287"><entry colname="1" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.76-tble1" guid="_ce00d822-a0b1-42dd-b31b-254e923ff615"><block><txt break.before="1"/></block></entry><entry colname="2" align="left" valign="top" id="sch.3-pt.3-tbl-tblr-oc.76-tble2" guid="_7b2d2cad-3a5b-497c-9ed3-2c16d9963415"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.76-tble2-para1" guid="_2eadad27-8be4-4be1-a967-b74a6c6cf3a0" affected.by.uncommenced="0"><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.76-tble2-para1-para2.ii" guid="_c9562786-6fb3-40ec-9663-abc461cdccba" affected.by.uncommenced="0"><no>(ii)</no><block><txt break.before="1">for a wharf not constructed within a marina—each of the following Australian Standards to the extent requirements stated in the Standard apply to relevant loading matters for the design or construction of the wharf—</txt><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.76-tble2-para1-para2.ii-para3.A" guid="_89309071-3839-40c8-a4aa-b92a18e38f17" affected.by.uncommenced="0"><no>(A)</no><block><txt break.before="1">AS/NZS 1170.0;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.76-tble2-para1-para2.ii-para3.B" guid="_8a9b20d0-d881-44c7-9f96-fb49213bc6f7" affected.by.uncommenced="0"><no>(B)</no><block><txt break.before="1">AS/NZS 1170.1;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.76-tble2-para1-para2.ii-para3.C" guid="_99afce6f-7985-471a-bc61-a42f37541c67" affected.by.uncommenced="0"><no>(C)</no><block><txt break.before="1">AS/NZS 1170.2;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.76-tble2-para1-para2.ii-para3.D" guid="_28aebc01-45c9-4047-bffd-ee84f8c3b509" affected.by.uncommenced="0"><no>(D)</no><block><txt break.before="1">AS 1170.4;</txt></block></tli><tli id="sch.3-pt.3-tbl-tblr-oc.76-tble2-para1-para2.ii-para3.E" guid="_30233512-758e-4622-9033-6477c1003ccb" affected.by.uncommenced="0"><no>(E)</no><block><txt break.before="1">AS 4997;</txt></block></tli></tlist></block></tli></tlist></block></tli></tlist></block><block><tlist number.type="default"><tli id="sch.3-pt.3-tbl-tblr-oc.76-tble2-para1.b" guid="_3b7bd5bc-8ec8-4ffd-a328-9c38b95e6ed5" affected.by.uncommenced="0"><no>(b)</no><block><txt break.before="1">if a relevant planning scheme standard is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.76-tble2-para1.a" check="invalid">paragraph&#160;(a)</intref>—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in <intref refid="sch.3-pt.3-tbl-tblr-oc.76-tble2-para1.a" check="invalid">paragraph&#160;(a)</intref>.</txt></block></tli></tlist></block></entry></row></tbody></tgroup></table></block></part></schedule><schedule id="sch.4" guid="_612a09e0-9a70-4c76-ab7a-54c077f64562" type="schedule" affected.by.uncommenced="0" spent.amends="0" numbering.style="manual" provision.type="other"><no>Schedule 4</no><heading id="sch.4-he" guid="_2b1161d7-ab4e-427a-a127-ae0071d40116">Dictionary</heading><sourceref id="sch.4-ref" guid="_8d2ff033-c6e1-4837-b7e2-2175b38b4c02" affected.by.uncommenced="0"><intref refid="sec.3" target.guid="_67368720-90d1-46bb-8698-bee17e5b9ba2" check="valid">section&#160; 3</intref></sourceref><block><deflist><definition id="sch.4-def.aidtonavigation_" guid="_bebfa4a7-2c55-4667-947d-8bf4457ad503" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4-def.aidtonavigation" guid="_7269f84e-cecb-4a53-9af9-f111e6da0dee" type="definition">aid to navigation</defterm> see the <legref jurisd="QLD" type="act" target.doc.id="act-1994-014" target.version.series="44f453e2-ccd9-4a10-af83-c3dccd6d5dbe" check="valid"><name emphasis="yes">Transport Operations (Marine Safety) Act 1994</name></legref>, <legref jurisd="QLD" type="act" refid="sec.104" target.doc.id="act-1994-014" target.version.series="44f453e2-ccd9-4a10-af83-c3dccd6d5dbe" target.guid="_21d0360d-80eb-445c-acf1-8037938f9353" check="valid">section&#160;104</legref>.</txt></definition><definition id="sch.4-def.allocation_" guid="_97f5966b-d42e-4b5b-9dbb-25f0add219f4" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4-def.allocation" guid="_ad1d9aca-96db-4e10-8cb0-4a34f22dcf8f" type="definition">allocation</defterm> means an allocation of quarry material under <legref jurisd="QLD" type="act" refid="ch.2" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" target.guid="_e79c1f1f-293b-42ad-8afa-bb985822b513" check="valid">chapter&#160;2</legref>, <legref jurisd="QLD" type="act" refid="ch.2-pt.5" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" target.guid="_246fb89c-4d71-43f3-b60b-9f2088bec7f5" check="valid">part&#160;5</legref>, <legref jurisd="QLD" type="act" refid="ch.2-pt.5-div.1" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" target.guid="_54aaf065-cae1-4d9e-9bca-8d5aff7b4140" check="valid">division&#160;1</legref> of the <legref jurisd="QLD" type="act" target.doc.id="act-1995-041" target.version.series="39a7aba6-f809-4679-a873-5554dbdad9f8" check="valid">Act</legref>.</txt></definition><definition id="sch.4-def.GoldCoastWaterwaysAuthority_" guid="_62922426-452d-4ef5-bb64-67af3f4da762" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4-def.GoldCoastWaterwaysAuthority" guid="_fea37c6b-5c5a-4628-9a1e-2727c081c210" type="definition">Gold Coast Waterways Authority</defterm> means the Gold Coast Waterways Authority established under the <legref jurisd="QLD" type="act" target.doc.id="act-2012-038" target.version.series="4cebf891-e043-43f9-ba91-5cce6b740506" check="valid"><name emphasis="yes">Gold Coast Waterways Authority Act 2012</name></legref>.</txt></definition><definition id="sch.4-def.navigationalchannel_" guid="_9434d2b9-5232-46b2-b6c4-f20ccd807bce" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4-def.navigationalchannel" guid="_d48bfecf-74f7-4896-949f-3858e2b34c34" type="definition">navigational channel</defterm> means a channel marked by aids to navigation built, erected or placed in tidal water under the <legref jurisd="QLD" type="act" target.doc.id="act-1994-014" target.version.series="44f453e2-ccd9-4a10-af83-c3dccd6d5dbe" check="valid"><name emphasis="yes">Transport Operations (Marine Safety) Act 1994</name></legref>.</txt></definition><definition id="sch.4-def.prescribedtidalworks_" guid="_1d1424a5-5e1a-4d2c-951b-70fb94412537" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4-def.prescribedtidalworks" guid="_fd906114-e434-42f3-855b-974632f14848" type="definition">prescribed tidal works</defterm> means the works that are prescribed tidal works under <intref refid="sec.15" target.guid="_6f7bc87e-3fa6-4e4e-99ef-a966e02f52ed" check="valid">section&#160;15</intref>.</txt></definition><definition id="sch.4-def.publicmarinefacility_" guid="_8432cb8e-81f6-4c08-88af-6af968815d82" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.4-def.publicmarinefacility" guid="_12c4b8ef-1757-4949-b79e-861d018fd981" type="definition">public marine facility</defterm> see the <legref jurisd="QLD" type="act" target.doc.id="act-1994-008" target.version.series="060a2469-1586-4719-b2aa-d22cc9ff8daf" check="valid"><name emphasis="yes">Transport Infrastructure Act 1994</name></legref>, <legref jurisd="QLD" type="act" refid="sch.6" target.doc.id="act-1994-008" target.version.series="060a2469-1586-4719-b2aa-d22cc9ff8daf" target.guid="_8f92dfc8-8640-4c01-8835-c09330c3ee8a" check="valid">schedule&#160;6</legref>.</txt></definition></deflist></block></schedule></schedules></subordleg>