<?xml version="1.0" encoding="utf-8"?>
<!DOCTYPE act PUBLIC "-//OQPC//DTD QuILLS Act//EN" "Act.dtd">
<!--************************************************************************************************************-->
<!--                                              DISCLAIMER                                                    -->
<!---->
<!--Queensland does not accept responsibility for the accuracy or completeness of material on this website      -->
<!--(or any other website referred to on this website) except as set out below. Users should exercise their     -->
<!--own skill and care in the use of the material.                                                              -->
<!---->
<!--No warranty is given that the material located on this site, or on any other site referred to on this site, -->
<!--is free from error or omission. Users should exercise their own skill and care with respect to the use of   -->
<!--the material. Accordingly, the State of Queensland and its servants and agents expressly disclaim liability -->
<!--for any act done or omission made in reliance on any such material and any consequences of any such act or  -->
<!--omission. This notice must not be erased.                                                                   -->
<!---->
<!--************************************************************************************************************-->
<act title="Planning Act 2016" bill.title="Planning Act 2016" year.introduced="2015" year.passed="2016" year.assent="2016" no="25" publication.date="2017-03-29" type="act" amending="none" bill.no="47" bill.type="government" act.type="publicgeneral" print.type="act.reprint" first.valid.date="2016-05-25" in.force="partuncommenced" introduction.date="2015-11-12T00:00:00+10:00" parliament.no="55" la.third.reading.date="2016-05-17T00:00:00+10:00" id="act-2016-025" version.desc.id="7ccfc2f7-9af4-4c90-badf-3f74b6e07594" version.series.id="d4a7e9d3-f73d-48a3-9459-9be0b66a1c15" end.valid.date="2017-07-03"><coverdata id="cd" guid="_275c2cba-9237-4ab1-83a7-bd44f4c922f7"><statusrecord id="cd-status" guid="_fc70ce44-ac47-4584-89c9-679727e7aaa4"><heading id="cd-status-he" guid="_23b2b9bc-cedd-457e-8af9-0828b0576330">Reprint note</heading><block><txt break.before="1">Some provisions of this legislation are not in operation. These provisions are italicised. For details, see the List of legislation.</txt></block></statusrecord></coverdata><wrapper><front id="frnt" guid="_22fa24d6-aca3-447b-b6dc-873582919c06"><shorttitle id="frnt-st" guid="_94fc588e-2628-41c4-a60c-e9afd94ffbcd">Planning Act 2016</shorttitle><longtitle id="frnt-lt" guid="_e86728e2-c005-4b41-a4f9-9c63cf9df0c5"><block><txt break.before="1">An Act providing for an efficient, effective, transparent, integrated, coordinated and accountable system of land use planning and development assessment to facilitate the achievement of ecological sustainability</txt></block></longtitle></front><body numbering.style="manual"><chapter id="ch.1" guid="_a673dbf1-5575-40a0-913d-d4a453cd6d77" status="uncommenced" affected.by.uncommenced="0"><no>Chapter 1</no><heading id="ch.1-he" guid="_5eee6b1d-3e77-4249-b49b-fe42c5933456">Preliminary</heading><clause id="sec.1" guid="_e7d55c08-8361-4981-ba14-9ce4526230f4" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>1</no><heading id="sec.1-he" guid="_4d433f5a-3d93-4ca6-bf3d-0b0ca32fc392">Short title</heading><block><txt break.before="1">This Act may be cited as the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Planning Act 2016</name></legref>.</txt></block></clause><clause id="sec.2" guid="_1389ce90-ca05-4bb2-b993-4f9f36aad3c3" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>2</no><heading id="sec.2-he" guid="_6629f3a7-ea73-4e25-b49e-d832014704af">Commencement</heading><block><txt break.before="1">This Act, other than section 324, commences on a day to be fixed by proclamation.</txt></block></clause><clause id="sec.3" guid="_4c1797de-6ca2-495e-bcf1-692cfc292d51" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>3</no><heading id="sec.3-he" guid="_ce9636dc-4352-4cf9-8477-c0d08d330a71">Purpose of Act</heading><subclause id="sec.3-ssec.1" guid="_28bb1693-65b1-42ff-adfb-c33554a0ebdb" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The purpose of this Act is to establish an efficient, effective, transparent, integrated, coordinated, and accountable system of land use planning (<defterm id="sec.3-def.planning" guid="_15f4630c-1048-4fb7-832f-dc95559c79c4" type="definition">planning</defterm>), development assessment and related matters that facilitates the achievement of ecological sustainability.</txt></block></subclause><subclause id="sec.3-ssec.2" guid="_34e53e1f-a847-4591-95a8-78f243ed5f1c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1"><defterm id="sec.3-def.Ecologicalsustainability" guid="_f521728d-fea0-40c4-89f8-f6130596370c" type="definition">Ecological sustainability</defterm> is a balance that integrates—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.3-ssec.2-para1.a" guid="_5078dbbd-d8d5-4d64-ae70-7f4699f52dc5" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the protection of ecological processes and natural systems at local, regional, State, and wider levels; and</txt></block></li><li id="sec.3-ssec.2-para1.b" guid="_9ffc7761-5372-452e-88dd-9630979d50a2" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">economic development; and</txt></block></li><li id="sec.3-ssec.2-para1.c" guid="_085e0193-1c14-4449-b9f5-0a10e9807b9d" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the maintenance of the cultural, economic, physical and social wellbeing of people and communities.</txt></block></li></list></block></subclause><subclause id="sec.3-ssec.3" guid="_7375b18e-8393-4d68-8eeb-709e37eec148" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">For subsection (2)—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.3-ssec.3-para1.a" guid="_7bb7d319-d241-4459-af37-6e60c1af4f35" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">protecting ecological processes and natural systems includes—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.3-ssec.3-para1.a-para2.i" guid="_812eba6b-2946-4ad8-9161-fb1714b0152b" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">conserving, enhancing or restoring the life-supporting capacities of air, ecosystems, soil and water for present and future generations; and</txt></block></li><li id="sec.3-ssec.3-para1.a-para2.ii" guid="_ea63b2bd-0a00-4bb6-baf4-3b02d6e358dd" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">protecting biological diversity; and</txt></block></li></list></block></li><li id="sec.3-ssec.3-para1.b" guid="_7d1854a0-b5d1-46e3-b44f-e6ed3125dcd1" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">achieving economic development includes achieving diverse, efficient, resilient and strong economies, including local, regional and State economies, that allow communities to meet their needs but do not compromise the ability of future generations to meet their needs; and</txt></block></li><li id="sec.3-ssec.3-para1.c" guid="_9dc45c11-17d7-414b-ab53-0a0b8f175716" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">maintaining the cultural, economic, physical and social wellbeing of people and communities includes—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.3-ssec.3-para1.c-para2.i" guid="_a045616b-8baf-4cc6-b2bb-081ade129fd8" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">creating and maintaining well-serviced, healthy, prosperous, liveable and resilient communities with affordable, efficient, safe and sustainable development; and</txt></block></li><li id="sec.3-ssec.3-para1.c-para2.ii" guid="_24875f66-7a1f-4e8d-ae20-d7345de979de" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">conserving or enhancing places of special aesthetic, architectural, cultural, historic, scientific, social or spiritual significance; and</txt></block></li><li id="sec.3-ssec.3-para1.c-para2.iii" guid="_907575da-c0e5-4ea1-8459-374334e5a76b" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">providing for integrated networks of pleasant and safe public areas for aesthetic enjoyment and cultural, recreational or social interaction; and</txt></block></li><li id="sec.3-ssec.3-para1.c-para2.iv" guid="_5abb7431-b88f-4468-b66b-6f57e0995815" status="uncommenced" provision.type="other"><no>(iv)</no><block status="uncommenced"><txt break.before="1">accounting for potential adverse impacts of development on climate change, and seeking to address the impacts through sustainable development (sustainable settlement patterns or sustainable urban design, for example).</txt></block></li></list></block></li></list></block></subclause></clause><clause id="sec.4" guid="_e7e8d683-8ddb-4a34-b5f1-28025ecc91eb" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>4</no><heading id="sec.4-he" guid="_880db11a-cd5d-4194-b565-802d83a3a24a">System for achieving ecological sustainability</heading><block status="uncommenced"><txt break.before="1">The system to facilitate the achievement of ecological sustainability includes—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.4-para1.a" guid="_c3cbf34c-176b-485a-ab83-3ba9821676df" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1"><b>State planning policies</b> (including temporary ones) setting out planning and development assessment policies about matters of State interest; and</txt></block></li><li id="sec.4-para1.b" guid="_ab4ea362-472f-4cb5-8a89-b32c976c2649" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1"><b>regional plans</b> setting out integrated planning and development assessment policies about matters of State interest for particular regions of the State; and</txt></block></li><li id="sec.4-para1.c" guid="_b12430ac-79a9-4ea3-a989-d8d0598a14e9" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1"><b>planning schemes</b> setting out integrated State, regional and local planning and development assessment policies for all of a local government area; and</txt></block></li><li id="sec.4-para1.d" guid="_fc6787b6-120b-4120-a716-c3202bb40461" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1"><b>temporary local planning instruments</b> (<b>TLPIs</b>) setting out planning and development assessment policies to protect all or part of a local government area from adverse impacts in urgent or emergent circumstances; and</txt></block></li><li id="sec.4-para1.e" guid="_cdec7008-be19-467b-af5c-0a9c4ef33fc1" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1"><b>planning scheme policies</b> setting out policies, for all or part of a local government area, that support—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.4-para1.e-para2.i" guid="_9a666117-2b81-4eef-80ae-e2c903a1edd2" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">planning and development assessment policies under planning schemes; and</txt></block></li><li id="sec.4-para1.e-para2.ii" guid="_543d959b-7c01-4468-840b-e8ea0352c1b7" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">action by a local government in making or amending local planning instruments; and</txt></block></li><li id="sec.4-para1.e-para2.iii" guid="_fed04577-8199-4e83-8761-440ddb5cb3c8" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">action by a local government under the development assessment system; and</txt></block></li></list></block></li><li id="sec.4-para1.f" guid="_a9c1a0c3-ccf6-4a5f-bdea-6fbc1e9bb11b" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">a <b>development assessment system</b>, including SARA, for implementing planning instruments and other policies and requirements about development by—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.4-para1.f-para2.i" guid="_ec5cdc9b-23c3-48d1-b8f1-fb21ec0d6ca7" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">categorising development; and</txt></block></li><li id="sec.4-para1.f-para2.ii" guid="_3b505532-a556-4080-a3ed-982e9393a106" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">categorising types of assessment for particular development; and</txt></block></li><li id="sec.4-para1.f-para2.iii" guid="_bc44cf58-2d9e-402c-9d98-756254b20af3" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">stating the processes for making, receiving, assessing and deciding development applications; and</txt></block></li><li id="sec.4-para1.f-para2.iv" guid="_d5ed7f88-fad4-40ed-be36-77df88adb2e3" status="uncommenced" provision.type="other"><no>(iv)</no><block status="uncommenced"><txt break.before="1">establishing rights and responsibilities in relation to development approvals; and</txt></block></li></list></block></li><li id="sec.4-para1.g" guid="_aeeec588-b47b-42fb-8967-fd0038be1a99" status="uncommenced" provision.type="other"><no>(g)</no><block status="uncommenced"><txt break.before="1">arrangements to expeditiously identify and authorise development of key infrastructure; and</txt></block></li><li id="sec.4-para1.h" guid="_aaad17c9-d7e9-45b6-9ff6-ce1c8e3b3881" status="uncommenced" provision.type="other"><no>(h)</no><block status="uncommenced"><txt break.before="1">planning, development assessment, charging and other arrangements for infrastructure, to promote—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.4-para1.h-para2.i" guid="_2bf128c7-3244-4cfa-8bc6-9ad2434d3df7" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">integrated land use and infrastructure planning; and</txt></block></li><li id="sec.4-para1.h-para2.ii" guid="_8567d71a-8ffc-4138-83de-d37b720cc1bf" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the cost-effective provision of infrastructure to service development; and</txt></block></li></list></block></li><li id="sec.4-para1.i" guid="_5e01a1db-bc9d-4339-97ae-2469332dc8c3" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a variety of offences and enforcement arrangements; and</txt></block></li><li id="sec.4-para1.j" guid="_14f458cd-bc83-478d-b0c1-ab0d8389f3f0" status="uncommenced" provision.type="other"><no>(j)</no><block status="uncommenced"><txt break.before="1">Ministerial powers to protect, or give effect to, the State’s interests relating to planning and development assessment; and</txt></block></li><li id="sec.4-para1.k" guid="_c135dc5d-8611-4a4b-bfe6-8206687b53e2" status="uncommenced" provision.type="other"><no>(k)</no><block status="uncommenced"><txt break.before="1">dispute resolution (including appeals and declarations) for administrative decisions.</txt></block></li></list></block></clause><clause id="sec.5" guid="_ddf747bb-5bf9-4662-bcfc-18dc56bd3977" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>5</no><heading id="sec.5-he" guid="_222fa695-d982-4186-a62a-78d80172f913">Advancing purpose of Act</heading><subclause id="sec.5-ssec.1" guid="_0af2eeeb-50bf-49ef-b983-44353dc0b311" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">An entity that performs a function under this Act must perform the function in a way that advances the purpose of this Act.</txt></block></subclause><subclause id="sec.5-ssec.2" guid="_5c12d466-c775-4515-8641-2bcea321f9f8" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">Advancing the purpose of this Act includes—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.5-ssec.2-para1.a" guid="_e3d6dde2-b7e7-495c-883e-8cc3dd4600d9" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">following ethical decision-making processes that—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.5-ssec.2-para1.a-para2.i" guid="_b232008e-5bff-48a1-bbaa-9499f77b2ca8" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">take account of short and long-term environmental effects of development at local, regional, State and wider levels; and</txt></block></li><li id="sec.5-ssec.2-para1.a-para2.ii" guid="_9f167c20-09af-4136-b61b-3b22ea58adc8" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">apply the precautionary principle, namely that the lack of full scientific certainty is not a reason for delaying taking a measure to prevent degradation of the environment if there are threats of serious or irreversible environmental damage; and</txt></block></li><li id="sec.5-ssec.2-para1.a-para2.iii" guid="_9eae4861-8e0d-4891-89d2-eaec05ebb530" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">seek to provide for equity between present and future generations; and</txt></block></li></list></block></li><li id="sec.5-ssec.2-para1.b" guid="_d1a519a3-38a1-49b2-88e2-7df3aabe449e" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">providing opportunities for the community to be involved in making decisions; and</txt></block></li><li id="sec.5-ssec.2-para1.c" guid="_6495dd9b-32a8-4c04-beea-78c6d7b353a3" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">promoting the sustainable use of renewable and non-renewable natural resources, including biological, energy, extractive, land and water resources that contribute to economic development through employment creation and wealth generation; and</txt></block></li><li id="sec.5-ssec.2-para1.d" guid="_12ca2121-5148-4341-9676-b83f0a553b1f" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">valuing, protecting and promoting Aboriginal and Torres Strait Islander knowledge, culture and tradition; and</txt></block></li><li id="sec.5-ssec.2-para1.e" guid="_4fb8eb8e-e1c8-47e1-b42c-cc18451d34f6" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">conserving places of cultural heritage significance; and</txt></block></li><li id="sec.5-ssec.2-para1.f" guid="_7a1e1722-887c-4612-b82a-429d0e83b94a" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">providing for housing choice, diversity and affordability; and</txt></block></li><li id="sec.5-ssec.2-para1.g" guid="_1fdf0cca-fd70-4b0b-82c6-03626bb4df60" status="uncommenced" provision.type="other"><no>(g)</no><block status="uncommenced"><txt break.before="1">encouraging investment, economic resilience and economic diversity; and</txt></block></li><li id="sec.5-ssec.2-para1.h" guid="_666be5c6-2339-40f9-bec1-6cde96ddd924" status="uncommenced" provision.type="other"><no>(h)</no><block status="uncommenced"><txt break.before="1">supplying infrastructure in a coordinated, efficient and orderly way; and</txt></block></li><li id="sec.5-ssec.2-para1.i" guid="_3cfea4a1-efad-4060-aa74-ca321f68e914" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">applying amenity, conservation, energy use, health and safety in the built environment in ways that are cost-effective and of public benefit; and</txt></block></li><li id="sec.5-ssec.2-para1.j" guid="_995fbfd6-b944-4c7c-9e66-09ef4d27a7e1" status="uncommenced" provision.type="other"><no>(j)</no><block status="uncommenced"><txt break.before="1">avoiding, if practicable, or otherwise minimising the adverse environmental effects of development (climate change, urban congestion or declining human health, for example).</txt></block></li></list></block></subclause></clause><clause id="sec.6" guid="_3a34791a-1bfb-48de-9ff3-02966ecb9d86" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>6</no><heading id="sec.6-he" guid="_69b69b75-8744-4c6e-a0b9-1acf1d7cca5f">Definitions</heading><block status="uncommenced"><txt break.before="1">The dictionary in schedule 2 defines particular words used in this Act.</txt><note id="sec.6-note" guid="_ce0410aa-ec63-4f65-97f1-093ff88f7cc9" type="example"><heading id="sec.6-note-he" guid="_4e21ec64-55ad-461b-abee-d77fd2c0be03">Note—</heading><block status="uncommenced"><txt break.before="1">For the meanings of some defined words used in particular contexts, see section 280.</txt></block></note></block></clause><clause id="sec.7" guid="_ac49c707-0c5a-419e-8d65-2966a652618b" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>7</no><heading id="sec.7-he" guid="_2d36c635-4b59-4566-95df-4d565bc46734">Act binds all persons</heading><subclause id="sec.7-ssec.1" guid="_e3419897-8823-4190-98fd-5187b49f8d01" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This Act binds all persons, including—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.7-ssec.1-para1.a" guid="_ac59430f-0fc1-4580-babc-deb1a2d6cc0f" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the State, other than the Coordinator-General when performing functions under the State Development Act; and</txt></block></li><li id="sec.7-ssec.1-para1.b" guid="_a70c0cbb-f3d8-425f-b399-b9cc67e9d03e" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the Commonwealth and the other States, to the extent Parliament’s legislative power allows.</txt></block></li></list></block></subclause><subclause id="sec.7-ssec.2" guid="_0cf62d39-1960-4adf-9bd7-dd290e7e39d9" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, the Commonwealth or a State can not be prosecuted for an offence against this Act.</txt></block></subclause></clause></chapter><chapter id="ch.2" guid="_7aa039f4-abb9-4fa6-9d72-b42e39c992bc" status="uncommenced" affected.by.uncommenced="0"><no>Chapter 2</no><heading id="ch.2-he" guid="_585d7169-c853-46f7-bd23-029255b3e293">Planning</heading><part id="ch.2-pt.1" guid="_41c93e6f-cc78-4061-a9fb-78bc3b2966c9" status="uncommenced" affected.by.uncommenced="0"><no>Part 1</no><heading id="ch.2-pt.1-he" guid="_461d92e4-7b2e-43d6-901d-71c00697b009">Introduction</heading><clause id="sec.8" guid="_ea15caa2-1909-46e9-b41b-eef963b82301" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>8</no><heading id="sec.8-he" guid="_b47eb390-46ce-4320-80c9-e2397d37b013">What are planning instruments</heading><subclause id="sec.8-ssec.1" guid="_a2cf7b63-b116-42d7-b966-aae0002031f8" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A <defterm id="sec.8-def.planninginstrument" guid="_b2ed6671-e28c-4887-9f68-07604a632a62" type="definition">planning instrument</defterm> is an instrument that sets out policies for planning or development assessment, and is either—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.8-ssec.1-para1.a" guid="_b33e421c-6230-4c90-a5e2-0399a2487701" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a State planning instrument; or</txt></block></li><li id="sec.8-ssec.1-para1.b" guid="_c8cd2f1a-f27a-44f6-9480-221bd5cfb104" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a local planning instrument.</txt></block></li></list></block></subclause><subclause id="sec.8-ssec.2" guid="_5c0600ef-98ca-4364-9f2a-7311bda235e3" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">A <defterm id="sec.8-def.Stateplanninginstrument" guid="_097a270c-afae-42a8-b761-232420c4eb3b" type="definition">State planning instrument</defterm> is a planning instrument made by the Minister to protect or give effect to State interests, and is either—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.8-ssec.2-para1.a" guid="_86231d59-0af7-482f-bb22-13010b1fc602" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a State planning policy (including a temporary State planning policy); or</txt></block></li><li id="sec.8-ssec.2-para1.b" guid="_74046638-e8be-4deb-b944-ca4388a6e72b" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a regional plan.</txt></block></li></list></block></subclause><subclause id="sec.8-ssec.3" guid="_5c2a3f36-0c57-4893-ae9e-21175cc57a16" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">A <defterm id="sec.8-def.localplanninginstrument" guid="_4682f094-58c7-48c6-9e36-ee1d83de5c18" type="definition">local planning instrument</defterm> is a planning instrument made by a local government, and is either—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.8-ssec.3-para1.a" guid="_32a6c0c0-6021-4712-8c79-cd20f56643b7" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a planning scheme; or</txt></block></li><li id="sec.8-ssec.3-para1.b" guid="_5cc10a4f-fe0e-499d-941e-a335122ed753" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a TLPI; or</txt></block></li><li id="sec.8-ssec.3-para1.c" guid="_b70649ad-50d6-4659-a621-6b3c9c28772e" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">a planning scheme policy.</txt></block></li></list></block></subclause><subclause id="sec.8-ssec.4" guid="_a91cddc5-b69b-4e7b-84d4-855b9d51e879" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">To the extent of any inconsistency—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.8-ssec.4-para1.a" guid="_825e7ffd-e341-4329-b167-b3ecc17d01b0" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a State planning policy applies instead of a regional plan or local planning instrument; and</txt></block></li><li id="sec.8-ssec.4-para1.b" guid="_1bdaa074-dc69-466a-a522-c0ed02bc477c" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a regional plan applies instead of a local planning instrument; and</txt></block></li><li id="sec.8-ssec.4-para1.c" guid="_f3263e93-4dd8-4f27-b54d-dc2c7f0b22fb" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">a planning scheme applies instead of a planning scheme policy; and</txt></block></li><li id="sec.8-ssec.4-para1.d" guid="_de98c228-a145-4958-9c5c-50e9573094cd" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">a TLPI applies instead of a planning scheme or planning scheme policy.</txt></block></li></list><note id="sec.8-ssec.4-note" guid="_ec47eb69-b243-4e08-9c9a-fcf8e9b30c25" type="example"><heading id="sec.8-ssec.4-note-he" guid="_7155d4cc-84c8-42ad-aa16-e9399eb2c225">Note—</heading><block status="uncommenced"><txt break.before="1">A TLPI may also suspend, or otherwise affect, the operation of a planning scheme or planning scheme policy—see section 23(3). </txt></block></note></block></subclause><subclause id="sec.8-ssec.5" guid="_0c7f372e-c26a-4765-ae6f-372e05ede8f8" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">A local planning instrument must not include a provision about building work, to the extent the building work is regulated under the building assessment provisions, unless allowed under the Building Act.</txt></block></subclause><subclause id="sec.8-ssec.6" guid="_43753536-060d-4f59-8841-a864c2096800" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">To the extent a local planning instrument does not comply with subsection (5), the local planning instrument is of no effect.</txt></block></subclause></clause><clause id="sec.9" guid="_0604067c-fb4e-4edc-80b7-3667fcd935aa" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>9</no><heading id="sec.9-he" guid="_787584f6-1508-40b7-a927-9757b7fe9067">When planning instruments and designations have effect</heading><subclause id="sec.9-ssec.1" guid="_0fbc1ede-1831-47eb-9d37-aa72779eea9b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section explains when certain instruments made under this chapter start to have effect.</txt></block></subclause><subclause id="sec.9-ssec.2" guid="_fcff973e-1e2b-4491-a26a-0e05ca3182ba" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The <defterm id="sec.9-def.effectiveday" guid="_234ff791-1c2e-49de-bab4-ce0755af4eae" type="definition">effective day</defterm> is the day when the following instruments start to have effect—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.9-ssec.2-para1.a" guid="_bf915364-4fe7-4ac8-8214-d54a6dcaeabc" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a planning instrument or designation;</txt></block></li><li id="sec.9-ssec.2-para1.b" guid="_0413c79d-3e22-4999-a6f1-7f5b52269ffc" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">an amendment or repeal of a planning instrument or designation.</txt></block></li></list></block></subclause><subclause id="sec.9-ssec.3" guid="_88cec4b5-d7b2-4b9a-83c6-a642e693768e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">If this chapter requires public notice of the instrument to be published, the effective day is—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.9-ssec.3-para1.a" guid="_0cc63d0b-a588-4a2d-8bd7-3595cd44270f" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the day on which the notice is published in the gazette; or</txt></block></li><li id="sec.9-ssec.3-para1.b" guid="_89bdea67-8bc4-4e79-88d5-30613a24468b" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a later day stated in—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.9-ssec.3-para1.b-para2.i" guid="_ef6f44b2-d5af-47f1-853c-98636fac4301" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the notice; or</txt></block></li><li id="sec.9-ssec.3-para1.b-para2.ii" guid="_db6ff6f9-a1e8-4bc8-b552-2615aa389842" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the instrument.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.9-ssec.4" guid="_a56f5664-54d5-4889-bf7d-322fd3785af8" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">However, with the Minister’s agreement in writing, the effective day for the making or amendment of a TLPI is the day when the local government, at a public meeting, resolved to give the TLPI or amendment, and the request for an earlier effective day, to the Minister for approval.</txt></block></subclause><subclause id="sec.9-ssec.5" guid="_c3a8c8e5-e6cf-45b2-ba10-7401687814ab" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">Also, if under this chapter a planning instrument may be repealed by a later planning instrument, the repeal starts to have effect when the later planning instrument starts to have effect.</txt></block></subclause></clause></part><part id="ch.2-pt.2" guid="_b8487942-fabd-4010-9834-2d8711668c1c" status="uncommenced" affected.by.uncommenced="0"><no>Part 2</no><heading id="ch.2-pt.2-he" guid="_2380c3d5-279c-4492-948a-7ac9af3add58">State planning instruments</heading><clause id="sec.10" guid="_cbcc547d-2077-453a-b0c7-1cd7d9645a38" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>10</no><heading id="sec.10-he" guid="_622d3b55-7a48-4d0c-81f7-bdf0dc8953e7">Making or amending State planning instruments</heading><subclause id="sec.10-ssec.1" guid="_57bd6e73-f564-49f2-b98c-2b0b7a94ddff" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if the Minister proposes to make or amend a State planning instrument.</txt></block></subclause><subclause id="sec.10-ssec.2" guid="_d60c79e7-b0c8-4069-b0aa-55efe935138b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The Minister must publish a public notice that states—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.10-ssec.2-para1.a" guid="_3a7df5a5-f660-49e7-92a1-2fe63fc3926b" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">where copies of the proposed State planning instrument, or proposed amendment, (the <defterm id="sec.10-ssec.2-def.instrument" guid="_3a075531-5746-40d5-9b7e-7778d23b2577" type="definition">instrument</defterm>) may be inspected or purchased; and</txt></block></li><li id="sec.10-ssec.2-para1.b" guid="_9834e47c-d37c-4b0e-a9da-634fb9386452" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a phone number or email address to contact for information about the instrument; and</txt></block></li><li id="sec.10-ssec.2-para1.c" guid="_a841158b-b1db-4918-bff5-6badec2e8f1f" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">any person may make a written submission about the instrument to the Minister; and</txt></block></li><li id="sec.10-ssec.2-para1.d" guid="_8462a9d3-9216-4e26-9c4a-db2392ee8791" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">the requirements for properly making a submission; and</txt></block></li><li id="sec.10-ssec.2-para1.e" guid="_404544fc-c0ba-4680-aed4-f4943ca4365b" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">the period, after the public notice is gazetted, within which a submission may be made.</txt></block></li></list></block></subclause><subclause id="sec.10-ssec.3" guid="_aed84614-4bfa-48a0-9df6-a710220f8ef2" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The period for subsection (2)(e) must be at least—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.10-ssec.3-para1.a" guid="_7a3270f8-b3a4-4036-92b3-8e0bb61598e3" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for making a State planning policy—40 business days; or</txt></block></li><li id="sec.10-ssec.3-para1.b" guid="_8d9f0fb6-a3f1-4beb-acf8-9431dd09168d" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for amending a State planning policy—20 business days; or</txt></block></li><li id="sec.10-ssec.3-para1.c" guid="_3542f78b-ddeb-4739-a02e-e5cd5064a0c5" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">for making a regional plan—60 business days; or</txt></block></li><li id="sec.10-ssec.3-para1.d" guid="_708acc5f-a65b-47d4-8e61-c20f65bcc435" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">for amending a regional plan—30 business days.</txt></block></li></list></block></subclause><subclause id="sec.10-ssec.4" guid="_64d3b749-f144-40ed-9326-d601d74b278d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The Minister must give a copy of the public notice and instrument to each affected local government.</txt></block></subclause><subclause id="sec.10-ssec.5" guid="_0b530b6f-934b-4ba9-b363-6e5cfe8a75ac" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">After the Minister considers all submissions that are made as required under the public notice, the Minister must decide—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.10-ssec.5-para1.a" guid="_4b59369a-f0ff-4e88-a292-cab703276820" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">to make the instrument; or</txt></block></li><li id="sec.10-ssec.5-para1.b" guid="_5b04274a-8d18-4e7a-b4b7-2344f26810fa" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">to make the instrument with the changes that the Minister considers appropriate; or</txt></block></li><li id="sec.10-ssec.5-para1.c" guid="_7a948945-e5fb-46e2-ba3e-65da136c37df" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">not to make the instrument.</txt></block></li></list></block></subclause><subclause id="sec.10-ssec.6" guid="_09b28c7e-bb72-4f43-8cf5-ad267c259d96" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">If the Minister decides to make the instrument (with or without changes), the Minister must—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.10-ssec.6-para1.a" guid="_e48f7619-669b-4565-b9a9-a61dbd39dfdd" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">publish the decision by a public notice that states—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.10-ssec.6-para1.a-para2.i" guid="_d454c921-ef1e-4e97-8d18-ded6e3bd6f56" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the day when the instrument was made; and</txt></block></li><li id="sec.10-ssec.6-para1.a-para2.ii" guid="_fe142065-23b1-45a3-abb1-acfce6424105" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">where a copy of the instrument may be inspected or purchased; and</txt></block></li></list></block></li><li id="sec.10-ssec.6-para1.b" guid="_059ded85-4052-4f20-b31c-c2bc9fb217f2" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">give a copy of the notice, and the instrument, to each affected local government.</txt></block></li></list></block></subclause><subclause id="sec.10-ssec.7" guid="_439a0d85-f5bf-41c5-8926-c5ecb77ce59e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">A State planning instrument that is made or amended substantially in compliance with this section is valid, as long as any noncompliance does not—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.10-ssec.7-para1.a" guid="_954457e0-e5a5-4bf4-a2ac-e2e906c811bc" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">restrict the public’s opportunity to properly make submissions about the instrument; or</txt></block></li><li id="sec.10-ssec.7-para1.b" guid="_61121458-fee2-46f5-8565-a4075fd59747" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">adversely affect public awareness of the existence and nature of the instrument.</txt></block></li></list></block></subclause><subclause id="sec.10-ssec.8" guid="_80f5ba26-4171-4d89-9fa5-3e6ab486cf9f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(8)</no><block status="uncommenced"><txt break.before="1">If the Minister decides not to make the instrument, the Minister must publish the decision by a gazette notice.</txt></block></subclause></clause><clause id="sec.11" guid="_c1375db4-2688-472a-a912-579aafa16793" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>11</no><heading id="sec.11-he" guid="_c362e006-c8b8-4f6f-ba08-247d15d7878e">Minor amendments to State planning instruments</heading><subclause id="sec.11-ssec.1" guid="_476309f9-5e00-4ca2-9cbe-790a21ec601e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The Minister may make a minor amendment to a State planning instrument without complying with section 10.</txt></block></subclause><subclause id="sec.11-ssec.2" guid="_23668408-8bd9-4e12-80e6-b6e7571c1c21" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">Instead, the Minister may make a minor amendment by publishing a public notice that states—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.11-ssec.2-para1.a" guid="_dd6a47bb-e13e-4ecc-b43d-fef96dee60a1" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the day when the amendment was made; and</txt></block></li><li id="sec.11-ssec.2-para1.b" guid="_8237d097-8685-4e33-b42b-5eb1d1ac5297" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">where a copy of the amended State planning instrument may be inspected or purchased.</txt></block></li></list></block></subclause><subclause id="sec.11-ssec.3" guid="_faecdb86-9f1c-4853-85af-760416c0511b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">A <defterm id="sec.11-def.minoramendment" guid="_07f87d77-a3f0-4f81-b25f-b976fb754b66" type="definition">minor amendment</defterm>, of a State planning instrument, is an amendment that—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.11-ssec.3-para1.a" guid="_d1750b49-5af9-4293-a035-0cd7b3c0599e" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">corrects or otherwise changes—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.11-ssec.3-para1.a-para2.i" guid="_1306cd51-3cd1-485d-a5f1-ba6e975d94f0" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a spelling, grammatical or mapping error; or</txt></block></li><li id="sec.11-ssec.3-para1.a-para2.ii" guid="_a6b5abf1-b537-498c-88ca-0b74b0b28d68" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">an explanatory matter about the instrument; or</txt></block></li><li id="sec.11-ssec.3-para1.a-para2.iii" guid="_acfd5817-5ab5-448f-afc6-a9ad9ef42eac" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">the format or presentation of the instrument; or</txt></block></li><li id="sec.11-ssec.3-para1.a-para2.iv" guid="_249ad69d-1a97-4429-92dd-9c84034145f2" status="uncommenced" provision.type="other"><no>(iv)</no><block status="uncommenced"><txt break.before="1">a factual matter incorrectly stated; or</txt></block></li><li id="sec.11-ssec.3-para1.a-para2.v" guid="_da0ec4cf-42ce-49a4-b0cf-4d56b631cb27" status="uncommenced" provision.type="other"><no>(v)</no><block status="uncommenced"><txt break.before="1">a redundant or outdated term; or</txt></block></li><li id="sec.11-ssec.3-para1.a-para2.vi" guid="_4d14b6b3-9a8c-40af-8ab9-f1209a378433" status="uncommenced" provision.type="other"><no>(vi)</no><block status="uncommenced"><txt break.before="1">inconsistent numbering of provisions; or</txt></block></li><li id="sec.11-ssec.3-para1.a-para2.vii" guid="_a5673cf7-ab62-4b98-ba62-b3b4f94950e9" status="uncommenced" provision.type="other"><no>(vii)</no><block status="uncommenced"><txt break.before="1">a cross-reference in the instrument; or</txt></block></li></list></block></li><li id="sec.11-ssec.3-para1.b" guid="_348ec129-eaf1-45fe-89f7-234d0e06a822" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the Minister considers only reflects—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.11-ssec.3-para1.b-para2.i" guid="_3a6a34bc-b716-4150-b56d-b583d81b2a93" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a part of another State planning instrument, if the Minister considers adequate public consultation was carried out in relation to the making of that part of the other State planning instrument; or</txt></block></li><li id="sec.11-ssec.3-para1.b-para2.ii" guid="_42421568-5e84-43f5-9383-040acc6489c3" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">this Act or another Act; or</txt></block></li></list></block></li><li id="sec.11-ssec.3-para1.c" guid="_4982fc9c-888e-4c82-b468-19fe536aafac" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">is prescribed by regulation.</txt></block></li></list></block></subclause><subclause id="sec.11-ssec.4" guid="_75653109-5c7d-4d76-85b3-8b18dd0575c7" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The Minister must give a copy of the public notice, and the amendment, to each affected local government.</txt></block></subclause></clause><clause id="sec.12" guid="_76e19a2d-c61d-407c-a5e2-5a2447f225f7" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>12</no><heading id="sec.12-he" guid="_7fabbb8f-6ecd-48a2-9647-f8b9b68713a6">Making temporary State planning policies</heading><subclause id="sec.12-ssec.1" guid="_a06fd13e-b5fc-4ca3-a546-562052c4e66b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if the Minister considers a State planning policy is urgently required to protect or give effect to a State interest.</txt></block></subclause><subclause id="sec.12-ssec.2" guid="_37f492cb-6be4-4cdd-88a4-cf33053a3a60" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The Minister may make a State planning policy (a <defterm id="sec.12-def.temporaryStateplanningpolicy" guid="_a2eb083f-cf88-4b22-995f-ff7b12e39a76" type="definition">temporary State planning policy</defterm>) that has only temporary effect.</txt></block></subclause><subclause id="sec.12-ssec.3" guid="_c55a9796-08fa-451a-ad8d-96b8ca305f18" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">A temporary State planning policy may suspend or otherwise affect the operation of, but does not amend or repeal, a State planning instrument.</txt></block></subclause><subclause id="sec.12-ssec.4" guid="_32fa317d-2a26-4443-979a-45c3c3c54a6d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">Instead of complying with section 10, the Minister may make a temporary State planning policy by publishing a public notice that states—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.12-ssec.4-para1.a" guid="_0dec1e29-6aa3-47f3-8fd1-9fdc83312c78" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the name of the temporary State planning policy; and</txt></block></li><li id="sec.12-ssec.4-para1.b" guid="_f5c2dbf7-0373-453b-a75d-b59cc0fc6ab9" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the temporary State planning policy suspends or otherwise affects the operation of another State planning instrument—the name of the other State planning instrument; and</txt></block></li><li id="sec.12-ssec.4-para1.c" guid="_8e5d2633-cb3e-4524-8e04-99d85a55d291" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">if the temporary State planning policy has effect only in a part of the State—the name, or a description, of the part of the State; and</txt></block></li><li id="sec.12-ssec.4-para1.d" guid="_353e5e06-da6c-486f-a563-6ff95afbcef2" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">where a copy of the temporary State planning policy may be inspected or purchased.</txt></block></li></list></block></subclause><subclause id="sec.12-ssec.5" guid="_6914d452-142c-4dee-acfe-e5e806db89fd" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The Minister must give a copy of the notice, and the temporary State planning policy, to each affected local government.</txt></block></subclause><subclause id="sec.12-ssec.6" guid="_04e2af54-7a41-4a5b-9acf-2aeb210c10c5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">The temporary State planning policy has effect for 2 years from the effective day, or a shorter period stated in the policy, unless repealed sooner.</txt></block></subclause></clause><clause id="sec.13" guid="_d8df6c9f-388b-44c9-a0fb-07a3bac51012" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>13</no><heading id="sec.13-he" guid="_f8b4992b-ddbb-4710-b3a6-fc4c246c319c">Repealing State planning instruments</heading><subclause id="sec.13-ssec.1" guid="_dfa92b97-f6ef-45a8-8e2f-1be6e58c3821" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The Minister may repeal a State planning instrument by—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.13-ssec.1-para1.a" guid="_21ad439d-ecb7-4cd6-900a-b3368b17e306" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">making another State planning instrument that specifically repeals the instrument; or</txt></block></li><li id="sec.13-ssec.1-para1.b" guid="_654874b4-c76c-4218-9c1c-7211f493b202" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">publishing a public notice that states—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.13-ssec.1-para1.b-para2.i" guid="_1be6ec43-6257-4080-94d8-e909a291ae97" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the name of the State planning instrument; and</txt></block></li><li id="sec.13-ssec.1-para1.b-para2.ii" guid="_be2e9878-3869-4ea5-b18b-20bfb5dcc33a" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">if the State planning instrument has effect only in a part of the State—the name, or a description, of the part of the State; and</txt></block></li><li id="sec.13-ssec.1-para1.b-para2.iii" guid="_8c7cb7e5-902b-4609-9db1-696b534d6bf2" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">that the State planning instrument is repealed.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.13-ssec.2" guid="_80138b9e-f2da-4fb3-8b91-bfd5e473726b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The Minister must give a copy of the public notice to each affected local government.</txt></block></subclause></clause><clause id="sec.14" guid="_1483b7e5-407d-4e59-b058-a70aa9e2e77a" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>14</no><heading id="sec.14-he" guid="_fb33e2e1-58d4-4132-a631-bc29e59a5bdb">Advice to Minister about regional plans</heading><subclause id="sec.14-ssec.1" guid="_e4a5dd0a-1221-4dcc-89f8-4779a6804795" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The Minister may establish a regional planning committee for a region by a gazette notice that states the committee’s name and membership.</txt></block></subclause><subclause id="sec.14-ssec.2" guid="_2367d70d-17e8-4f6d-a553-9b19738384f3" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">When developing and implementing a regional plan, the Minister must consider the advice of any regional planning committee for the region.</txt></block></subclause></clause></part><part id="ch.2-pt.3" guid="_5f28461a-28ea-4d96-a498-1f83cb55313d" status="uncommenced" affected.by.uncommenced="0"><no>Part 3</no><heading id="ch.2-pt.3-he" guid="_d8d0fc76-a14c-40d7-a9c3-4cf84f45427f">Local planning instruments</heading><division id="ch.2-pt.3-div.1" guid="_ee77c8f9-1d05-4975-8455-48e74fe43cb1" status="uncommenced" affected.by.uncommenced="0"><no>Division 1</no><heading id="ch.2-pt.3-div.1-he" guid="_26873d63-c38c-47ec-a1f5-cc6d6b00b153">Introduction</heading><clause id="sec.15" guid="_91322370-0a1a-4f7e-8dcc-f7e0c2b15212" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>15</no><heading id="sec.15-he" guid="_a5fcf45d-8f21-41e2-9596-ac95b266e660">What part is about</heading><subclause id="sec.15-ssec.1" guid="_db2b3b79-3cfa-44b8-9aef-c3d668cbfc29" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This part sets out—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.15-ssec.1-para1.a" guid="_4970484e-4592-4aaa-9ecb-764ddd790b3f" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the process for making, amending or repealing a local planning instrument; and</txt></block></li><li id="sec.15-ssec.1-para1.b" guid="_138f0221-e0f6-4b96-ac6e-a2830161eee8" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the State’s powers in relation to local planning instruments.</txt></block></li></list></block></subclause><subclause id="sec.15-ssec.2" guid="_3250873e-fbdc-4b49-8788-f0f51fea3733" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">A local planning instrument, or amendment of a local planning instrument, (the <defterm id="sec.15-def.instrument" guid="_b33b80b6-1f6d-408e-a031-384c3bd12338" type="definition">instrument</defterm>) that is made substantially in compliance with the process in division 2 is valid, as long as any noncompliance does not—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.15-ssec.2-para1.a" guid="_8b4d1e32-3aa3-4074-b4a4-fb2f1c3119aa" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for the making or amending of a planning scheme or TLPI—restrict the Minister’s opportunity to consider whether the instrument would adversely affect State interests; or</txt></block></li><li id="sec.15-ssec.2-para1.b" guid="_a021d0d8-9c9e-4540-a631-3802169e2574" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the process provides for public consultation about the instrument—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.15-ssec.2-para1.b-para2.i" guid="_2a71af47-8b56-4baf-b8d6-27a6f5f5887e" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">restrict the public’s opportunity to properly make submissions about the instrument under that process; or</txt></block></li><li id="sec.15-ssec.2-para1.b-para2.ii" guid="_559b7459-f1d8-4699-87b3-7a3d2aecbdf5" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">adversely affect public awareness of the existence and nature of the instrument.</txt></block></li></list></block></li></list></block></subclause></clause><clause id="sec.16" guid="_88a66fe5-ad80-48c0-b08f-c440101539d8" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>16</no><heading id="sec.16-he" guid="_cd571b91-b0a8-400a-ba7c-a563f358f667">Contents of local planning instruments</heading><subclause id="sec.16-ssec.1" guid="_d0a4d717-64f2-4c9a-90d1-cc61eeec53fd" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A planning scheme must—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.16-ssec.1-para1.a" guid="_95a60ac2-e08f-48f6-864d-d8f69df82367" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">identify strategic outcomes for the local government area to which the planning scheme applies; and</txt></block></li><li id="sec.16-ssec.1-para1.b" guid="_3d7639eb-c8f4-4b2d-8d05-0f0b546514a1" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">include measures that facilitate the achievement of the strategic outcomes; and</txt></block></li><li id="sec.16-ssec.1-para1.c" guid="_52837b19-a8b2-451d-9d02-bf73a0ce6944" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">coordinate and integrate the matters dealt with by the planning scheme, including State and regional aspects of the matters.</txt></block></li></list></block></subclause><subclause id="sec.16-ssec.2" guid="_154b4612-9427-4767-bc75-264f21ba4f4a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">A regulation may prescribe requirements (the <defterm id="sec.16-def.regulatedrequirements" guid="_b3f11b5b-0f96-487b-a908-aa764a9b6d33" type="definition">regulated requirements</defterm>) for the contents of a local planning instrument.</txt></block></subclause><subclause id="sec.16-ssec.3" guid="_6ee796bb-5c61-46cb-a550-9dc4d1019106" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The contents prescribed by regulation apply instead of a local planning instrument, to the extent of any inconsistency.</txt></block></subclause></clause><clause id="sec.17" guid="_6e9a1252-0922-43c5-810a-b51f4d2d18f2" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>17</no><heading id="sec.17-he" guid="_951e0f5b-d0e6-42c1-b2a9-6b74ad4ad60a">Minister’s guidelines and rules</heading><subclause id="sec.17-ssec.1" guid="_5963951b-034d-478d-bd0a-43c90bf1bfe6" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The Minister must make an instrument that contains—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.17-ssec.1-para1.a" guid="_e3f03e68-cec5-482f-a2a3-6319180bd761" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">guidelines setting out the matters that the chief executive must consider when preparing a notice about making or amending planning schemes; and</txt></block></li><li id="sec.17-ssec.1-para1.b" guid="_e651b309-82f9-4674-a1b5-07e24ac00a1e" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">rules about—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.17-ssec.1-para1.b-para2.i" guid="_14e0d563-9fed-4da7-beeb-d390e556847f" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">making amendments including amendments to LGIPs, of a type stated in the rules, to planning schemes; and</txt></block></li><li id="sec.17-ssec.1-para1.b-para2.ii" guid="_c36e58b3-fbfe-40a1-8002-4908ebf716f1" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">making LGIPs, whether as part of a proposed planning scheme or as an amendment of a planning scheme; and</txt></block></li><li id="sec.17-ssec.1-para1.b-para2.iii" guid="_14a2cfc7-8ca2-49b6-be87-f82d17f7d4d4" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">reviewing LGIPs; and</txt></block></li><li id="sec.17-ssec.1-para1.b-para2.iv" guid="_6a669334-1d35-44ab-bf59-03e74fa3cd23" status="uncommenced" provision.type="other"><no>(iv)</no><block status="uncommenced"><txt break.before="1">making or amending planning scheme policies; and</txt></block></li><li id="sec.17-ssec.1-para1.b-para2.v" guid="_d240342b-ed23-40b9-9fa0-ccb5f2b5f4e2" status="uncommenced" provision.type="other"><no>(v)</no><block status="uncommenced"><txt break.before="1">making or amending TLPIs; and</txt></block></li><li id="sec.17-ssec.1-para1.b-para2.vi" guid="_ed6a63b0-ed61-4a7d-82e6-b31682dfb51b" status="uncommenced" provision.type="other"><no>(vi)</no><block status="uncommenced"><txt break.before="1">making a planning change of a type mentioned in section 30(4)(e)(i), whether as part of a planning scheme or as an amendment of a planning scheme.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.17-ssec.2" guid="_4d282b15-101b-40a0-a3e7-a4a30f9b5931" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">Sections 10 and 11 apply to making or amending the guidelines or rules as if the guidelines or rules were a State planning policy.</txt></block></subclause><subclause id="sec.17-ssec.3" guid="_d21fd3f3-b39d-426a-afb8-6bebaafc1c6d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The guidelines and rules start to have effect when a regulation prescribes the guidelines and rules.</txt></block></subclause></clause></division><division id="ch.2-pt.3-div.2" guid="_9788e2d0-b6ed-43d2-9b07-f48742d09cb3" status="uncommenced" affected.by.uncommenced="0"><no>Division 2</no><heading id="ch.2-pt.3-div.2-he" guid="_dfa4c696-c061-4ea3-b894-5f5cadc548bc">Making, amending or repealing local planning instruments</heading><clause id="sec.18" guid="_7478d00e-4f20-4bb0-b9a0-fd2ad17226b4" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>18</no><heading id="sec.18-he" guid="_39e68cc3-527d-4c4c-9f48-ca35d148059f">Making or amending planning schemes</heading><subclause id="sec.18-ssec.1" guid="_5d61efd7-b2e5-4f76-a15e-9cb5bf240dd3" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if a local government proposes to make or amend a planning scheme.</txt></block></subclause><subclause id="sec.18-ssec.2" guid="_0b6a833b-2788-4f54-adc3-32348f5f0ec1" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The local government must give notice of the proposed planning scheme, or proposed amendment, (the <defterm id="sec.18-def.instrument" guid="_d2166a68-d48c-4bd5-b654-bc9c9112a605" type="definition">instrument</defterm>) to the chief executive.</txt></block></subclause><subclause id="sec.18-ssec.3" guid="_6491476f-872f-41f1-b5a3-94f7e45ed961" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">After consulting with the local government, the chief executive—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.18-ssec.3-para1.a" guid="_3fb3c441-359a-4c14-a709-4836a0570cf5" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">must give a notice about the process for making or amending the planning scheme to the local government; and</txt></block></li><li id="sec.18-ssec.3-para1.b" guid="_d18241df-018c-4456-a7c0-00e31bee9354" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">may give an amended notice about the process for making or amending the planning scheme to the local government.</txt></block></li></list></block></subclause><subclause id="sec.18-ssec.4" guid="_c7554715-b236-420a-a6e4-c39178f9fa10" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The chief executive must consider the Minister’s guidelines when preparing the notice or an amended notice.</txt></block></subclause><subclause id="sec.18-ssec.5" guid="_72967ebc-816f-4472-b0dc-0a91f65a7aaf" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The notice, or amended notice, must state at least—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.18-ssec.5-para1.a" guid="_28749567-1716-44b0-bf6e-50f29e690a3f" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the local government must publish at least 1 public notice about the proposal to make or amend the planning scheme; and</txt></block></li><li id="sec.18-ssec.5-para1.b" guid="_e24ac6ff-2b99-4623-b50f-444e0a8e8d64" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the local government must keep the instrument available for inspection and purchase for a period (the <defterm id="sec.18-ssec.5-def.consultationperiod" guid="_9637ae0a-948a-4d63-8da6-8c0aa40d7326" type="definition">consultation period</defterm>) stated in the public notice of at least—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.18-ssec.5-para1.b-para2.i" guid="_c234ca47-2f05-4402-b633-3a487ddb2fa5" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">for a proposed planning scheme—40 business days after the day the public notice is published in a newspaper circulating in the local government area; or</txt></block></li><li id="sec.18-ssec.5-para1.b-para2.ii" guid="_74348cd8-989a-46a8-bc37-aaaa80ce790a" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">for a proposed amendment—20 business days after the day the public notice is published in a newspaper circulating in the local government area; and</txt></block></li></list></block></li><li id="sec.18-ssec.5-para1.c" guid="_785f65b4-ec8c-4242-b52b-19f12fd3a448" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the public notice must state that any person may make a submission about the instrument to the local government within the consultation period; and</txt></block></li><li id="sec.18-ssec.5-para1.d" guid="_483ad755-c1e0-4e07-a8c0-680f86680382" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">a communications strategy that the local government must implement about the instrument; and</txt></block></li><li id="sec.18-ssec.5-para1.e" guid="_26ba1384-fdf4-4953-9db2-5567c57a2989" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">the local government must consider all properly made submissions about the planning scheme or amendment; and</txt></block></li><li id="sec.18-ssec.5-para1.f" guid="_34ae9881-c1ef-4c88-ac60-189112bd95a9" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">the local government must notify persons who made properly made submissions about how the local government dealt with the submissions; and</txt></block></li><li id="sec.18-ssec.5-para1.g" guid="_61023398-c84c-4c19-a7b1-5ee392e0933d" status="uncommenced" provision.type="other"><no>(g)</no><block status="uncommenced"><txt break.before="1">the local government must give the Minister a notice containing a summary of the matters raised in the properly made submissions and stating how the local government dealt with the matters; and</txt></block></li><li id="sec.18-ssec.5-para1.h" guid="_403992f5-1ca3-409e-97d1-381d513fb6c1" status="uncommenced" provision.type="other"><no>(h)</no><block status="uncommenced"><txt break.before="1">after the planning scheme is made or amended, the local government must publish a public notice about making or amending the planning scheme.</txt></block></li></list></block></subclause><subclause id="sec.18-ssec.6" guid="_2bc83a5f-af14-449c-aa4a-b4ccd7a054f3" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">The local government must make or amend the planning scheme by following the process in the notice or amended notice.</txt></block></subclause><subclause id="sec.18-ssec.7" guid="_bb31b168-aa48-43f8-b2c8-a3bf502efad3" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">If the notice requires the Minister to approve the instrument, the Minister may approve the instrument if the Minister considers the instrument appropriately integrates State, regional and local planning and development assessment policies, including policies under an applicable State planning instrument.</txt></block></subclause><subclause id="sec.18-ssec.8" guid="_eaaa9cd6-aa8f-4cec-bc95-f8e58fe9c94e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(8)</no><block status="uncommenced"><txt break.before="1">A planning scheme replaces any other planning scheme that the local government administers.</txt></block></subclause></clause><clause id="sec.19" guid="_0cccc8c1-dcb5-4a56-8633-82e53109ea50" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>19</no><heading id="sec.19-he" guid="_57d9983e-442a-40f2-aa37-b4e3d7cee8c1">Applying planning scheme in tidal areas</heading><subclause id="sec.19-ssec.1" guid="_ed6627a3-2ef6-41bc-9c90-ec8421907fb0" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A local government may apply a planning scheme as a categorising instrument in relation to prescribed tidal works in the tidal area for its non-port local government area, to the extent prescribed by regulation.</txt></block></subclause><subclause id="sec.19-ssec.2" guid="_b983a20c-e448-4b27-bfbc-13b94f5bb13f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.19-ssec.2-def.nonportlocalgovernmentarea_" guid="_69305d5f-d198-47d6-9c9d-dbae1493b6c2" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.19-ssec.2-def.nonportlocalgovernmentarea" guid="_20f80a35-f181-4a42-96ac-34ac905c4b7e" type="definition">non-port local government area</defterm>, for a local government, means the local government area, other than any strategic port land in the local government area.</txt></definition><definition id="sec.19-ssec.2-def.prescribedtidalworks_" guid="_5dfc6413-5828-451f-92ee-2f8518d51c12" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.19-ssec.2-def.prescribedtidalworks" guid="_c1e9e498-d879-44f8-935b-6ad21c533e87" type="definition">prescribed tidal works</defterm> means tidal works of a type prescribed by regulation.</txt></definition><definition id="sec.19-ssec.2-def.strategicportland_" guid="_e1d51839-1470-4d76-bebb-69acc087ea11" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.19-ssec.2-def.strategicportland" guid="_3ec77070-f798-4e03-bf69-0d98d6d3fc09" type="definition">strategic port land</defterm> see the <legref jurisd="QLD" type="act" check="unknown">Transport Infrastructure Act</legref>, section 286(5).</txt></definition><definition id="sec.19-ssec.2-def.tidalarea_" guid="_0d2cdcfe-2238-4088-813c-b09897db5146" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.19-ssec.2-def.tidalarea" guid="_292c31ff-bd54-4ca2-adee-bd7db482f6c6" type="definition">tidal area</defterm>, for a non-port local government area or strategic port land (each <defterm id="sec.19-ssec.2-def.thearea" guid="_2d447350-741b-461a-ac68-417009654028" type="definition">the area</defterm>), means—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.19-ssec.2-def.tidalarea-para1.a" guid="_8e69b55a-5d13-4d88-8e82-b6b7adbced00" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the part or parts of a tidal river, an estuarine delta, or an artificial waterway that are—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.19-ssec.2-def.tidalarea-para1.a-para2.i" guid="_0c306c78-f5b0-4b25-a5be-acaac9a0e7a1" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">subject to tidal influence; and</txt></block></li><li id="sec.19-ssec.2-def.tidalarea-para1.a-para2.ii" guid="_328dcf76-361f-4360-a41d-317c95f125c5" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">next to the area; and</txt></block></li><li id="sec.19-ssec.2-def.tidalarea-para1.a-para2.iii" guid="_4e118e0a-b96e-4453-bc91-8a31ccf9db0b" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">between the high-water mark and the middle of the river, delta or waterway; and</txt></block></li><li id="sec.19-ssec.2-def.tidalarea-para1.a-para2.iv" guid="_be34ec0a-4b3f-445a-b0c0-64679420e7b2" status="uncommenced" provision.type="other"><no>(iv)</no><block status="uncommenced"><txt break.before="1">no further up the river, delta or waterway than the spring tides ordinarily flow and reflow; and</txt></block></li></list></block></li><li id="sec.19-ssec.2-def.tidalarea-para1.b" guid="_1db879d8-55f6-43f2-b272-3169fed90f05" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">to the extent the boundary of the area is, or is seaward of, the high-water mark—the land that is seaward and within 50m of the high-water mark.</txt></block></li></list></definition></deflist></block></subclause></clause><clause id="sec.20" guid="_12c2cc10-7eaf-4e2f-a170-2b9e799832b0" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>20</no><heading id="sec.20-he" guid="_bdfe0792-14b1-4289-8cd7-1e0980ec16f3">Amending planning schemes under Minister’s rules</heading><subclause id="sec.20-ssec.1" guid="_0d155296-2dd9-4413-96ff-85d985262970" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to an amendment of a planning scheme that the Minister’s rules apply to.</txt></block></subclause><subclause id="sec.20-ssec.2" guid="_f4d1a8ec-f1d4-4f04-a8a5-2a120ce4e9f7" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">Instead of complying with section 18, a local government may amend a planning scheme by following the process in the Minister’s rules.</txt></block></subclause><subclause id="sec.20-ssec.3" guid="_42091077-445c-4495-a817-a4cdd7399646" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The rules must provide for the local government to publish a public notice about the planning scheme being amended.</txt></block></subclause></clause><clause id="sec.21" guid="_3ead47e3-4f9f-4639-9bd6-409659b4093e" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>21</no><heading id="sec.21-he" guid="_5ac28655-2d44-4d86-8c0c-2108f1a377e8">Making or amending LGIPs</heading><block status="uncommenced"><txt break.before="1">Despite sections 18 and 20, a local government must follow the process in the Minister’s rules for making or amending an LGIP, if the local government—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.21-para1.a" guid="_42ffc2a1-9d7f-4f14-b3c7-c07e16e9456b" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">proposes to include an LGIP in a planning scheme; or</txt></block></li><li id="sec.21-para1.b" guid="_af28cbed-d802-42d0-afb3-4a5c5980b023" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">amends a planning scheme to include an LGIP; or</txt></block></li><li id="sec.21-para1.c" guid="_a6ef3c52-9ff6-4306-883e-00e33a24a452" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">amends an LGIP.</txt></block></li></list></block></clause><clause id="sec.22" guid="_9e9edf93-4967-45e3-a305-521e738e86ac" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>22</no><heading id="sec.22-he" guid="_d2dd8d89-2c2c-464e-8a1b-80a45e53f843">Making or amending planning scheme policies</heading><subclause id="sec.22-ssec.1" guid="_9abc0291-cf1e-400f-893e-13cc2165bf7e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A local government may make or amend a planning scheme policy by following the process in the Minister’s rules.</txt></block></subclause><subclause id="sec.22-ssec.2" guid="_27bb0124-edf5-4c2c-ae16-e8686e7c76f8" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The rules must provide for the local government to publish a public notice about the making or amendment of a planning scheme policy.</txt></block></subclause></clause><clause id="sec.23" guid="_420dcef1-3470-4f9a-bab8-1a1923714fe9" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>23</no><heading id="sec.23-he" guid="_6a6b89d4-370d-448c-8004-10eb1594dc4b">Making or amending TLPIs</heading><subclause id="sec.23-ssec.1" guid="_3e98792a-bd44-4884-9877-7615d90b3015" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A local government may make a TLPI if the local government and Minister decide—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.23-ssec.1-para1.a" guid="_9535b96e-9c17-4f28-91f2-e5236ce0afd2" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">there is significant risk of serious adverse cultural, economic, environmental or social conditions happening in the local government area; and</txt></block></li><li id="sec.23-ssec.1-para1.b" guid="_c1f70e4a-2077-4bfb-8db6-062ed15c932f" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the delay involved in using the process in sections 18 to 22 to make or amend another local planning instrument would increase the risk; and</txt></block></li><li id="sec.23-ssec.1-para1.c" guid="_a30203f1-5e18-4f88-bce5-7a159521eda5" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the making of the TLPI would not adversely affect State interests.</txt></block></li></list></block></subclause><subclause id="sec.23-ssec.2" guid="_0d9ac503-d49f-4342-8d23-cad1459c3872" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">A local government may amend a TLPI if the Minister decides the amendment of the TLPI would not adversely affect State interests.</txt></block></subclause><subclause id="sec.23-ssec.3" guid="_6ecf1dd3-36d2-4958-a68f-d92d77b9634a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">A TLPI may suspend or otherwise affect the operation of another local planning instrument, but does not amend or repeal the instrument.</txt></block></subclause><subclause id="sec.23-ssec.4" guid="_6fed4306-63f6-41f9-aefa-09c5a612e5f5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The local government may make or amend a TLPI by following the process in the Minister’s rules.</txt></block></subclause><subclause id="sec.23-ssec.5" guid="_7aab0ee3-f85f-4797-9487-a4a3bd51c353" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The rules must provide for—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.23-ssec.5-para1.a" guid="_45275690-30b7-47fa-a84c-3727c3bf6f62" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the Minister to approve a TLPI or amendment before the TLPI or amendment is made; and</txt></block></li><li id="sec.23-ssec.5-para1.b" guid="_4833ea26-90b8-4162-a607-88aee0a3ccbf" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the local government to publish a public notice about the making of a TLPI or amendment.</txt></block></li></list></block></subclause><subclause id="sec.23-ssec.6" guid="_b84be73f-4936-4049-b587-c469d5fa8c04" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">The TLPI, with or without an amendment, has effect for 2 years after the effective day, or a shorter period stated in the TLPI, unless repealed sooner.</txt></block></subclause><subclause id="sec.23-ssec.7" guid="_4b2c423d-ffd2-43f3-868f-57f4894c8f14" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">A TLPI—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.23-ssec.7-para1.a" guid="_ef1b923b-c637-45d2-9e23-6b10f77e3bbf" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">does not create a superseded planning scheme; and</txt></block></li><li id="sec.23-ssec.7-para1.b" guid="_5806840c-5622-4aca-a4cf-93fa2169f58b" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">is not an adverse planning change.</txt></block></li></list></block></subclause></clause><clause id="sec.24" guid="_935c87c5-feae-483f-9470-5ab21472856b" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>24</no><heading id="sec.24-he" guid="_6403404c-dff4-43c0-85d8-c5799d9044ae">Repealing TLPIs or planning scheme policies</heading><subclause id="sec.24-ssec.1" guid="_de7c43de-6eca-4184-a133-8ad9dc7cb4a1" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A local government may repeal a TLPI, or planning scheme policy, (the <defterm id="sec.24-def.instrument" guid="_0acb94bf-6899-4100-8055-ec628b6c36ea" type="definition">instrument</defterm>) by resolution.</txt></block></subclause><subclause id="sec.24-ssec.2" guid="_c9a0f4a8-8c38-478a-bd4d-e296342c4cba" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, if the instrument was made by, or at the direction of, the Minister, the local government must get the Minister’s written approval before making the resolution.</txt></block></subclause><subclause id="sec.24-ssec.3" guid="_ee3e77d0-9331-4490-b277-ecce54e29936" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">As soon as practicable after the local government makes the resolution, the local government must publish a public notice that states—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.24-ssec.3-para1.a" guid="_db8ca886-3622-4cb8-9b5c-ce8b5f8f0e51" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the name of the local government; and</txt></block></li><li id="sec.24-ssec.3-para1.b" guid="_144b52e6-18c2-4de8-9114-f67e32c64605" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the name of the instrument being repealed; and</txt></block></li><li id="sec.24-ssec.3-para1.c" guid="_93afdaeb-9fc8-4cbb-9d39-92244bdc6771" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the day when the resolution was made.</txt></block></li></list></block></subclause><subclause id="sec.24-ssec.4" guid="_e0adff78-0e7f-4923-84eb-098b2b957c9a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The local government must give a copy of the public notice to the chief executive.</txt></block></subclause><subclause id="sec.24-ssec.5" guid="_c9b78a01-c8a7-4c66-aa8c-6175e0f17ac8" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">A local government may repeal a TLPI by making, or amending, a planning scheme to specifically repeal the TLPI.</txt></block></subclause><subclause id="sec.24-ssec.6" guid="_8d3f0c8a-d055-4144-9cae-f664a5864800" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">The planning scheme policies for a local government area are repealed by making (but not amending) a planning scheme for the local government area.</txt></block></subclause></clause><clause id="sec.25" guid="_871f0896-82f8-41ca-9803-93fd9b3b1b9c" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>25</no><heading id="sec.25-he" guid="_e46ec9ea-c2c8-4a4b-b79c-ae1f1e1ab7f7">Reviewing planning schemes</heading><subclause id="sec.25-ssec.1" guid="_827def54-5b8c-44f4-95ee-d0f30ff8eb03" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A local government must—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.25-ssec.1-para1.a" guid="_a9834f2d-9265-470b-b405-7590f88a9aaa" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">review its planning scheme within 10 years after—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.25-ssec.1-para1.a-para2.i" guid="_0bcb9c3f-a5e6-4d67-ad37-1069da4785a7" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the planning scheme was made; or</txt></block></li><li id="sec.25-ssec.1-para1.a-para2.ii" guid="_81c77900-a110-4bc9-9f07-c5e5cd5046f1" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">if the planning scheme has been reviewed—the planning scheme was last reviewed; and</txt></block></li></list></block></li><li id="sec.25-ssec.1-para1.b" guid="_8537231a-5c33-4af6-b79e-c5b28af4e349" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">decide, based on that review, whether to amend or replace the planning scheme.</txt></block></li></list></block></subclause><subclause id="sec.25-ssec.2" guid="_a7ae6d28-12d3-496e-8856-de388e112bb5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">If the local government decides not to amend or replace the planning scheme, the local government must—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.25-ssec.2-para1.a" guid="_b74f706d-a061-4765-8238-002903095b88" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">give written reasons for the decision to the chief executive; and</txt></block></li><li id="sec.25-ssec.2-para1.b" guid="_eb6ea9dd-0004-40a6-a29e-21bea1750d06" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">publish a public notice, in the approved form, about the decision; and</txt></block></li><li id="sec.25-ssec.2-para1.c" guid="_db11712d-7f78-4fdd-8b92-be146486a365" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">keep a copy of the public notice in a conspicuous place in the local government’s public office, for a period of at least 40 business days after the notice is published.</txt></block></li></list></block></subclause><subclause id="sec.25-ssec.3" guid="_6dbcd7c8-69c5-4fa4-8e46-74577d01a05b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">Despite subsection (1), a local government must review any LGIP (an <defterm id="sec.25-def.LGIPreview" guid="_a327c471-5053-4277-9ae8-52b8bc650890" type="definition">LGIP review</defterm>) in its planning scheme within 5 years after—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.25-ssec.3-para1.a" guid="_f6a8c20f-9773-4c02-a6df-d7f9b5ab7f87" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the LGIP was included in the planning scheme; and</txt></block></li><li id="sec.25-ssec.3-para1.b" guid="_9fb9120f-22eb-4a39-878f-ba8727dfefba" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the LGIP has been reviewed—the LGIP was last reviewed.</txt></block></li></list></block></subclause><subclause id="sec.25-ssec.4" guid="_0e89a33b-0897-4262-8f34-e60d6d840d1b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">When conducting an LGIP review, the local government must follow the process in the Minister’s rules.</txt></block></subclause><subclause id="sec.25-ssec.5" guid="_349d31e3-d504-47f7-810d-66b8eef724d4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">An LGIP review is not a review for subsection (1).</txt></block></subclause></clause></division><division id="ch.2-pt.3-div.3" guid="_322757e0-6dd5-4509-b5c6-3974b913231b" status="uncommenced" affected.by.uncommenced="0"><no>Division 3</no><heading id="ch.2-pt.3-div.3-he" guid="_39a6f850-5cf0-422b-b697-1e96956b9e17">State powers for local planning instruments</heading><clause id="sec.26" guid="_5e9eec29-a7d8-4d7f-8d13-74960ab6be20" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>26</no><heading id="sec.26-he" guid="_6ac0c4b1-934f-493a-8b03-90b5e2518f07">Power of Minister to direct action be taken</heading><subclause id="sec.26-ssec.1" guid="_146f524a-7bb7-44b5-85f9-7c2705ed6cd0" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to the following made by a local government—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.26-ssec.1-para1.a" guid="_60acfb16-116c-4635-9f14-b75b400d68cc" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">an existing local planning instrument or designation;</txt></block></li><li id="sec.26-ssec.1-para1.b" guid="_d270c71c-973b-4dbd-a763-dec28f6b96f3" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a proposed local planning instrument or designation;</txt></block></li><li id="sec.26-ssec.1-para1.c" guid="_c00a3a84-c0a6-4205-a064-b43f0c306185" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">a proposed amendment of a local planning instrument or designation.</txt></block></li></list></block></subclause><subclause id="sec.26-ssec.2" guid="_3f9e6aca-bbdf-43b4-aefa-2da1dc7bfb4a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">If the Minister considers the local government should take action—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.26-ssec.2-para1.a" guid="_91d3be84-4e01-4889-8cf6-4d8e55561334" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">to ensure an instrument is consistent with the regulated requirements; or</txt></block></li><li id="sec.26-ssec.2-para1.b" guid="_e2192297-042e-4519-a2f2-2d981e62055e" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">to protect, or give effect to, a State interest;</txt></block></li></list></block><block status="uncommenced"><txt break.before="1">the Minister may give the local government a notice that complies with subsection (3).</txt></block></subclause><subclause id="sec.26-ssec.3" guid="_296062f4-8aea-4df7-be45-445899bc3ee3" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The notice must state—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.26-ssec.3-para1.a" guid="_7a59a89d-b0d7-4cca-a67a-af9aeabce9d7" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the action that the Minister considers the local government should take; and</txt></block></li><li id="sec.26-ssec.3-para1.b" guid="_959413e3-9b22-4bcb-831b-3b0127d0ee8f" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the reasons for taking the action; and</txt></block></li><li id="sec.26-ssec.3-para1.c" guid="_802957c4-8b80-48f1-883c-2d9c614e7992" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the local government may make a submission to the Minister about the local government taking the action; and</txt></block></li><li id="sec.26-ssec.3-para1.d" guid="_68ccd88c-0bd3-4299-8dc2-2d054421251a" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">the reasonable period within which a submission may be made.</txt></block></li></list></block></subclause><subclause id="sec.26-ssec.4" guid="_b074954c-1ce3-490c-85f3-11fad01c839b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">After the Minister considers all submissions made as required under the notice, the Minister must decide—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.26-ssec.4-para1.a" guid="_99bb423b-9425-423c-a03f-01d724a55f2a" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">to direct the local government to take the action stated in the notice; or</txt></block></li><li id="sec.26-ssec.4-para1.b" guid="_91fe66ff-e97a-48f3-9373-9c3ddf56ab2c" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">to direct the local government to take other action; or</txt></block></li><li id="sec.26-ssec.4-para1.c" guid="_fd17e75e-bbc5-47ed-a374-44a9308f0966" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">not to direct the local government to take any action.</txt></block></li></list></block></subclause><subclause id="sec.26-ssec.5" guid="_f37e2d08-83bd-45d7-8c13-d1c030de0182" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">Without limiting subsection (4), the Minister may direct the local government—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.26-ssec.5-para1.a" guid="_a910ae6d-159b-4ea0-a964-12c307bb3676" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">to review a planning scheme, as required under section 25, and report the results of the review to the Minister; or</txt></block></li><li id="sec.26-ssec.5-para1.b" guid="_2a9e1962-2915-459d-94df-9f318c6a8ad0" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">to review a designation, and report the results of the review to the Minister; or</txt></block></li><li id="sec.26-ssec.5-para1.c" guid="_e3917ec8-cd34-49ae-acbc-219c54967703" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">to make, amend or repeal a local planning instrument as required under sections 18 to 24; or</txt></block></li><li id="sec.26-ssec.5-para1.d" guid="_6f9aeb15-444a-4ab7-ac19-fdd076097bf7" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">to amend a designation as required under the process in the designation process rules or to repeal a designation under section 40.</txt></block></li></list></block></subclause><subclause id="sec.26-ssec.6" guid="_b9f030b4-7642-4d02-b61a-f08d2f6ecede" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">If the Minister decides to direct the local government to take action, the Minister must give the local government a notice that states—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.26-ssec.6-para1.a" guid="_63d1e34f-cd85-49d1-ab20-d70491ae5d20" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the nature of the action; and</txt></block></li><li id="sec.26-ssec.6-para1.b" guid="_7ccc9383-04ca-4b7f-b93f-d208377eedcc" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a reasonable period within which the local government must take the action.</txt></block></li></list></block></subclause><subclause id="sec.26-ssec.7" guid="_4927e3b2-c99e-4c00-9240-4d733bbb323b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">If the local government does not take the action, the Minister may—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.26-ssec.7-para1.a" guid="_e774b9f3-6852-4488-9aab-09ec0ba041c2" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">take the action; and</txt></block></li><li id="sec.26-ssec.7-para1.b" guid="_6f30bc5e-937f-4a99-a02f-03ed2d2bf2cf" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">recover any expense the Minister reasonably incurs in taking the action from the local government as a debt.</txt></block></li></list></block></subclause><subclause id="sec.26-ssec.8" guid="_77dab045-f983-44c2-b4d7-cdd554f78995" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(8)</no><block status="uncommenced"><txt break.before="1">The action taken by the Minister has the same effect as if the local government had taken the action.</txt></block></subclause></clause><clause id="sec.27" guid="_ca62954f-244c-4940-9c5a-ab720bbd2370" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>27</no><heading id="sec.27-he" guid="_8b1e0a5c-d829-4aa6-bec7-da5af24a0050">Power of Minister to take urgent action</heading><subclause id="sec.27-ssec.1" guid="_f9272039-8133-4a62-b17b-1388d95ceddb" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if the Minister considers—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.27-ssec.1-para1.a" guid="_a239445b-1344-4bc1-b4ad-7e3c21afd899" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">action should be taken under section 26(2)(b) to protect, or give effect to, a State interest; and</txt></block></li><li id="sec.27-ssec.1-para1.b" guid="_a6f8fb1e-ddec-46b7-96a5-16c56aa3ea3b" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the action must be taken urgently.</txt></block></li></list></block></subclause><subclause id="sec.27-ssec.2" guid="_61c2ae36-dc6f-453a-802d-cce4f278e02d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The Minister may give the local government a notice that states—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.27-ssec.2-para1.a" guid="_3caa4e2d-f5e4-49ac-9c0c-acd8c9afa34f" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the action that the Minister intends to take; and</txt></block></li><li id="sec.27-ssec.2-para1.b" guid="_fd70ff5e-f502-40e8-ae9c-4a53eadb76fa" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the reasons for taking the action.</txt></block></li></list></block></subclause><subclause id="sec.27-ssec.3" guid="_db763b80-cfdb-4ee1-914e-e91b0a6a3137" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">After giving the notice, the Minister may take the action as required under the process in the Minister’s rules without—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.27-ssec.3-para1.a" guid="_d9cee953-78dd-4b31-9b52-e8ff7cdaefd4" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">giving a direction to the local government under section 26; or</txt></block></li><li id="sec.27-ssec.3-para1.b" guid="_b3df504f-c1d2-4dc1-a6f0-41f290303506" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">consulting with any person before taking the action.</txt></block></li></list></block></subclause><subclause id="sec.27-ssec.4" guid="_45418b6e-2718-4f81-91af-180d45db61b0" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The action taken by the Minister has the same effect as if the local government had taken the action.</txt></block></subclause><subclause id="sec.27-ssec.5" guid="_43754d96-e9d5-43db-a34e-0f52e7559a8c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">Any expense the Minister reasonably incurs in taking the action may be recovered from the local government as a debt.</txt></block></subclause></clause><clause id="sec.28" guid="_97deb205-d5d2-472b-abd1-e81389b1ef96" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>28</no><heading id="sec.28-he" guid="_35351fe5-d10d-4e42-bd79-709089248a3d">Limitation of liability</heading><block status="uncommenced"><txt break.before="1">A local government does not incur liability for anything the local government does or does not do in complying with a direction of the Minister, or any action taken by the Minister, under this division in relation to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.28-para1.a" guid="_dbe2fe01-d196-4a63-8fa3-58432cc8c7e9" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">an existing local planning instrument or designation; or</txt></block></li><li id="sec.28-para1.b" guid="_7b3f2901-68b2-43d5-b608-f9fad0f28632" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a proposed local planning instrument or designation; or</txt></block></li><li id="sec.28-para1.c" guid="_f0d7a252-efda-4b3b-95d2-18f60f740646" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">a proposed amendment of a local planning instrument or designation.</txt></block></li></list></block></clause></division></part><part id="ch.2-pt.4" guid="_b0f43954-356c-4a58-a7d4-d2e6db2d3c15" status="uncommenced" affected.by.uncommenced="0"><no>Part 4</no><heading id="ch.2-pt.4-he" guid="_3e04f678-4ea5-4a62-ab2d-b6e428883285">Superseded planning schemes</heading><division id="ch.2-pt.4-div.1" guid="_4c0cb456-7fa2-40ef-807e-2e1bee8b6d89" status="uncommenced" affected.by.uncommenced="0"><no>Division 1</no><heading id="ch.2-pt.4-div.1-he" guid="_5ed2a188-6ee9-4e96-9f2f-345081888f12">Applying superseded planning scheme</heading><clause id="sec.29" guid="_05d77de1-1f00-4a0a-b878-860d47984727" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>29</no><heading id="sec.29-he" guid="_0e7d1a6b-6456-42c7-9487-e662aca56bde">Request to apply superseded planning scheme</heading><subclause id="sec.29-ssec.1" guid="_eadb7b2b-b44a-4ece-a4c7-1cd204871e40" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if a person wants a superseded planning scheme to apply to a proposed development application or proposed development.</txt></block></subclause><subclause id="sec.29-ssec.2" guid="_dd1af1c5-f272-45ca-915c-1c5770b05102" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">A <defterm id="sec.29-def.supersededplanningscheme" guid="_22e7a25c-ea73-4ed6-a2c1-490ea993199b" type="definition">superseded planning scheme</defterm> is a planning scheme, together with related planning scheme policies, that was in effect immediately before any of the following events (a <defterm id="sec.29-def.planningchange" guid="_290186cc-1f89-4aab-84a3-796204532592" type="definition">planning change</defterm>) happens—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.29-ssec.2-para1.a" guid="_9199b963-8f69-4f34-9334-24d18781c9c6" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the planning scheme was amended or replaced;</txt></block></li><li id="sec.29-ssec.2-para1.b" guid="_73272596-a34c-40dc-8796-0efa3393de27" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">any of the planning scheme policies were amended, replaced or repealed;</txt></block></li><li id="sec.29-ssec.2-para1.c" guid="_2b56ddc9-2917-44d5-ab75-78fef57402a9" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">a new planning scheme policy was made for the planning scheme.</txt></block></li></list></block></subclause><subclause id="sec.29-ssec.3" guid="_e4b508ad-e39d-4c34-8d00-0b67b6d05f20" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">A person may, within 1 year after the planning scheme and related policies become a superseded planning scheme, make a superseded planning scheme request in relation to the superseded planning scheme.</txt></block></subclause><subclause id="sec.29-ssec.4" guid="_4bde4bdd-9eb5-4d40-9e28-e3a8e0b35ff0" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">A <defterm id="sec.29-def.supersededplanningschemerequest" guid="_530bc6b2-ebee-4e0d-b9c7-1ad84c743ba1" type="definition">superseded planning scheme request</defterm> is a written request to a local government—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.29-ssec.4-para1.a" guid="_1e3a8fb0-72a4-41c4-8dc9-46ce3e70cbcd" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">to accept, assess and decide a development application (a <defterm id="sec.29-ssec.4-def.supersededplanningschemeapplication" guid="_5f5d5e4e-13e8-482b-b5e3-4caf5771975a" type="definition">superseded planning scheme application</defterm>) under a superseded planning scheme; or</txt></block></li><li id="sec.29-ssec.4-para1.b" guid="_5e279791-7fe8-4a8d-b02d-8b90d8a21ff4" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">to apply a superseded planning scheme to the carrying out of development that was accepted development under the superseded planning scheme.</txt></block></li></list></block></subclause><subclause id="sec.29-ssec.5" guid="_02c2b8a6-6d79-4839-8812-e1ea9c42ef80" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">A regulation may prescribe the following in relation to a superseded planning scheme request—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.29-ssec.5-para1.a" guid="_18f707f9-89ad-4e20-87a7-07990dccd19a" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">that the request must be made in an approved form;</txt></block></li><li id="sec.29-ssec.5-para1.b" guid="_dbee6700-365e-4845-ae7e-00f170ffddbb" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the information that must be given with the request;</txt></block></li><li id="sec.29-ssec.5-para1.c" guid="_a16763d6-faa0-4cd9-9b6e-180a506931d4" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">how the local government may set a fee for considering the request;</txt></block></li><li id="sec.29-ssec.5-para1.d" guid="_5990d2e8-c149-43cb-a90a-368a6d3e19b1" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">the period for deciding the request, and how the period may be extended;</txt></block></li><li id="sec.29-ssec.5-para1.e" guid="_b93e98e0-d867-4053-85f5-9a1f3e7dfb84" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">when and how a local government must notify the person making the request of the local government’s decision;</txt></block></li><li id="sec.29-ssec.5-para1.f" guid="_5a2cb9f7-a400-4897-9a99-7a58823f9b01" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">another matter related to deciding the request.</txt></block></li></list></block></subclause><subclause id="sec.29-ssec.6" guid="_c81bbe18-a2d2-49d3-b362-a8232ce3068a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">The local government must decide whether or not to agree to a superseded planning scheme request within the period prescribed by, or extended as required under, the regulation.</txt></block></subclause><subclause id="sec.29-ssec.7" guid="_2720c07e-416d-4a28-a333-b35e0e6d353a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">The local government must, within 5 business days after making the decision, give a decision notice to the person who made the superseded planning scheme request.</txt></block></subclause><subclause id="sec.29-ssec.8" guid="_9cf416de-6972-4985-87d7-9a5afe301293" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(8)</no><block status="uncommenced"><txt break.before="1">If, within 5 business days after the end of the period or of the period extended under subsection (6), the local government does not give a decision notice to the person, the local government is taken to have agreed to the superseded planning scheme request.</txt></block></subclause><subclause id="sec.29-ssec.9" guid="_f03249fc-f55c-4a10-b46d-d53685487ca4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(9)</no><block status="uncommenced"><txt break.before="1">If the local government decides to agree, or is taken to have agreed, to a request under subsection (4)(a)—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.29-ssec.9-para1.a" guid="_d3e66851-6359-41af-add0-31f4879704c5" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the superseded planning scheme application must be made within 6 months after the local government—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.29-ssec.9-para1.a-para2.i" guid="_4a493a8b-6058-4e23-b801-1428f914e5f6" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">gives a decision notice to the person who made the request; or</txt></block></li><li id="sec.29-ssec.9-para1.a-para2.ii" guid="_abc1f8b5-e802-480a-8f68-7610e68d0f7f" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">is taken to have agreed to the request; and</txt></block></li></list></block></li><li id="sec.29-ssec.9-para1.b" guid="_9079bbbf-9b7e-4bcd-b75a-638924596913" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the superseded planning scheme application may be made for prohibited development, despite section 50(2).</txt></block></li></list></block></subclause><subclause id="sec.29-ssec.10" guid="_842ce569-8afd-481f-82bb-ce9b388ff4f6" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(10)</no><block status="uncommenced"><txt break.before="1">If the local government decides to agree, or is taken to have agreed, to a request under subsection (4)(b)—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.29-ssec.10-para1.a" guid="_da528749-7d4a-4cc3-992f-35ebf2492c5b" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the development may be carried out under the superseded planning scheme; and</txt></block></li><li id="sec.29-ssec.10-para1.b" guid="_2a028c92-5d6a-4c61-a6d1-a464f623e9fd" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the following apply to the decision as if the decision were a development approval, given by the local government as the assessment manager, that took effect on the day when the decision notice was given or the local government is taken to have agreed to the request—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.29-ssec.10-para1.b-para2.i" guid="_eb51eed2-e72a-4622-9fa1-961b6267adcd" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">chapter 3, part 5, division 4;</txt></block></li><li id="sec.29-ssec.10-para1.b-para2.ii" guid="_334c21cd-7515-492a-ae76-f08b4eb29d52" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">schedule 1, table 1, item 3.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.29-ssec.11" guid="_80429b15-1cf3-4f7c-82a5-d6d3e0d7e17e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(11)</no><block status="uncommenced"><txt break.before="1">Despite section 45(6) and (7), an assessment manager must assess a superseded planning scheme application as if the superseded planning scheme was in effect instead of—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.29-ssec.11-para1.a" guid="_548619b9-0b81-457d-b1e4-f579cd48350e" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the planning scheme; and</txt></block></li><li id="sec.29-ssec.11-para1.b" guid="_85166b45-d28d-48ea-bb55-b9e96aba6bd3" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">any related planning scheme policies.</txt></block></li></list></block></subclause></clause></division><division id="ch.2-pt.4-div.2" guid="_1a6569ab-c144-4724-828c-d1584f94b1bf" status="uncommenced" affected.by.uncommenced="0"><no>Division 2</no><heading id="ch.2-pt.4-div.2-he" guid="_b58549fa-07dc-4781-9874-47efa12bfa53">Compensation</heading><clause id="sec.30" guid="_d27ea7e2-762a-44d0-96a0-ec3bd12cb898" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>30</no><heading id="sec.30-he" guid="_36546617-5564-4ba8-9c4c-4d77fc9f4d76">When this division applies</heading><subclause id="sec.30-ssec.1" guid="_33ad1c09-d3bb-49a7-8473-e200e299d970" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This division applies in relation to an adverse planning change.</txt></block></subclause><subclause id="sec.30-ssec.2" guid="_63818263-450a-4a72-a502-61f984ba89ad" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">An <defterm id="sec.30-def.adverseplanningchange" guid="_b38102b3-a079-4453-9776-8842042e4f18" type="definition">adverse planning change</defterm> is a planning change that reduces the value of an interest in premises.</txt></block></subclause><subclause id="sec.30-ssec.3" guid="_38b4a399-30ca-45df-b2be-443b926335bf" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">An adverse planning change includes a planning change (a <defterm id="sec.30-def.publicpurposechange" guid="_c5a8a17a-2c5c-496d-8374-47741757ae4b" type="definition">public purpose change</defterm>) that limits the use of premises to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.30-ssec.3-para1.a" guid="_f5960daf-6749-4388-913d-440a8203a474" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the purpose for which the premises were lawfully being used when the change was made; or</txt></block></li><li id="sec.30-ssec.3-para1.b" guid="_c2c09d72-15dc-456a-be8a-bd80b6280018" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a public purpose.</txt></block></li></list></block></subclause><subclause id="sec.30-ssec.4" guid="_1d0c4159-524e-4bcb-855e-59977ceeb7e9" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">However, an adverse planning change does not include a planning change that—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.30-ssec.4-para1.a" guid="_db0e11c9-0413-4340-8f81-2026f5239f91" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">has the same effect as another statutory instrument, other than a TLPI, for which compensation is not payable; or</txt></block></li><li id="sec.30-ssec.4-para1.b" guid="_36809a38-90e6-4f89-b908-f754f017016f" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">is made to comply with the regulated requirements; or</txt></block></li><li id="sec.30-ssec.4-para1.c" guid="_f42d66d4-26f7-40cc-ad7b-8c81366ad4f9" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">includes infrastructure in a planning scheme, or removes or changes the infrastructure shown in a planning scheme, including under a designation; or</txt></block></li><li id="sec.30-ssec.4-para1.d" guid="_9d495497-2502-42a7-8d51-505d771837b9" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">is about matters included in a LGIP; or</txt></block></li><li id="sec.30-ssec.4-para1.e" guid="_3d91bbb3-8178-4c23-b118-387a1e94c9d7" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">is made—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.30-ssec.4-para1.e-para2.i" guid="_1b0f6762-f6fc-47f5-bb0e-f9505b26cf67" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">to reduce a material risk of serious harm to persons or property on the premises from natural events or processes (bush fires, coastal erosion, flooding or landslides, for example); and</txt></block></li><li id="sec.30-ssec.4-para1.e-para2.ii" guid="_3ebac479-9f14-40f3-97bd-cc0e34a0e802" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">under the Minister’s rules; or</txt></block></li></list></block></li><li id="sec.30-ssec.4-para1.f" guid="_46719963-8df4-4c5e-9375-6870684af450" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">is about the relationships between, the location of, or the physical characteristics of, buildings, works or lots, if the yield achievable is not substantially different from the yield achievable before the change.</txt></block></li></list></block></subclause><subclause id="sec.30-ssec.5" guid="_0bec20ad-64b4-46ce-ac37-3de33ca482a3" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">For subsection (4)(e), the Minister’s rules must require a local government to prepare a report assessing feasible alternatives for reducing the risk stated in subsection (4)(e), including imposing development conditions on development approvals.</txt></block></subclause><subclause id="sec.30-ssec.6" guid="_7314c58a-56c5-4290-838d-1a7ec83eadde" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">For subsection (4)(f), the yield achievable is not substantially different from the yield achievable before the change, in relation to building work for a residential building, if the gross floor area of the residential building—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.30-ssec.6-para1.a" guid="_e6c43f3f-e61b-4828-9589-1e5360210f29" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">is not more than 2000m<sup>2</sup>; and</txt></block></li><li id="sec.30-ssec.6-para1.b" guid="_bb51d297-20fc-4fa9-83c0-59e158725ce1" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">is reduced by not more than 15%.</txt></block></li></list></block></subclause><subclause id="sec.30-ssec.7" guid="_ae2430c6-3b1a-4029-8faa-09abdc46f864" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.30-ssec.7-def.grossfloorarea_" guid="_05ba97eb-73cc-4065-b688-6a2c52eac20e" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.30-ssec.7-def.grossfloorarea" guid="_2ab37b9e-c1e9-413e-9810-81cbd43911a2" type="definition">gross floor area</defterm> means the sum of the floor areas, including all walls, columns and balconies, whether roofed or not, of all stories of every building located on premises, other than—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.30-ssec.7-def.grossfloorarea-para1.a" guid="_ea22c3b3-56aa-4806-bcab-4c8618cdc260" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the areas used for building services, a ground floor public lobby or a public mall in a shopping centre; or</txt></block></li><li id="sec.30-ssec.7-def.grossfloorarea-para1.b" guid="_c42b7d9b-3772-45fe-bc79-a990d12f8da6" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the areas associated with the parking, loading and manoeuvring of motor vehicles.</txt></block></li></list></definition><definition id="sec.30-ssec.7-def.yield_" guid="_f164ab36-f56e-4f4d-b99a-0dd1b84576a0" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.30-ssec.7-def.yield" guid="_8152def4-ed83-45dd-b4c2-66d9b15dea7a" type="definition">yield</defterm> means—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.30-ssec.7-def.yield-para1.a" guid="_49568f1f-fd0a-4d5b-906f-ab3127750a86" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for buildings and works—the gross floor area, the density of buildings or persons, or the plot ratio, achievable for premises; or</txt></block></li><li id="sec.30-ssec.7-def.yield-para1.b" guid="_00f71303-8484-48e5-b871-ea87c56c883f" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for reconfiguring a lot—the number of lots in a particular area of land.</txt></block></li></list></definition></deflist></block></subclause></clause><clause id="sec.31" guid="_c08c5a70-4879-432e-a3b5-6c777e8df87a" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>31</no><heading id="sec.31-he" guid="_291fc9e0-1bd2-42f9-b562-da04641eef18">Claiming compensation</heading><subclause id="sec.31-ssec.1" guid="_ac05bf91-5ba8-4e31-90dd-acad590abea5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section is about when a person (an <defterm id="sec.31-def.affectedowner" guid="_ef2e7e9f-fd86-4efb-b66f-551a5f95e785" type="definition">affected owner</defterm>) with an interest in premises, at the time an adverse planning change starts to have effect for the premises, may claim compensation because of the adverse planning change.</txt></block></subclause><subclause id="sec.31-ssec.2" guid="_aa6219c0-7203-440c-9b99-1525b50b1d32" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">An affected owner may claim compensation if the adverse planning change is a public purpose change.</txt></block></subclause><subclause id="sec.31-ssec.3" guid="_9ded2318-b32f-4275-bf6a-e2001f2ce84d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">An affected owner may claim compensation in relation to development that becomes assessable development after the adverse planning change has effect, if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.31-ssec.3-para1.a" guid="_c173d9c4-7d7f-470e-873b-b19c3a45f810" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the local government refuses a superseded planning scheme request in relation to the development; and</txt></block></li><li id="sec.31-ssec.3-para1.b" guid="_854c3121-bf7f-4fe4-97fd-94e067f61070" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a development application has been made for the development; and</txt></block></li><li id="sec.31-ssec.3-para1.c" guid="_22075d96-6114-4225-b68b-00102e1ff9ad" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the development application is—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.31-ssec.3-para1.c-para2.i" guid="_7dcff9f9-baf4-4544-bed8-fecfe65c8c9c" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">refused; or</txt></block></li><li id="sec.31-ssec.3-para1.c-para2.ii" guid="_664a8846-6afd-4464-9270-8fe38d82c1d8" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">approved with development conditions; or</txt></block></li><li id="sec.31-ssec.3-para1.c-para2.iii" guid="_185c723d-f0e8-4af2-8971-77a71377e37b" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">approved in part, with or without development conditions.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.31-ssec.4" guid="_5671196e-d069-48ff-91ab-e76f692f2576" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">An affected owner may claim compensation in relation to development that becomes prohibited development after the adverse planning change has effect, if the local government refuses a superseded planning scheme request in relation to the development.</txt></block></subclause><subclause id="sec.31-ssec.5" guid="_924d5f71-0280-43c7-8f24-72dee2c5264f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">However, an affected owner may not claim compensation because of an adverse planning change—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.31-ssec.5-para1.a" guid="_323ec501-ece0-453f-99a0-7c27ca79daf9" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">to the extent that compensation—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.31-ssec.5-para1.a-para2.i" guid="_88aea573-a5f0-4787-9666-7873c8545920" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">is payable under another Act; or</txt></block></li><li id="sec.31-ssec.5-para1.a-para2.ii" guid="_6355ce2f-8bb8-4a08-b661-abf379cd487c" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">has been paid to a previous owner of the interest; or</txt></block></li></list></block></li><li id="sec.31-ssec.5-para1.b" guid="_3e1fb8d2-3a05-4b0d-8574-258e085e6a97" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for anything done in contravention of this Act.</txt></block></li></list></block></subclause><subclause id="sec.31-ssec.6" guid="_03b33d92-931a-4c91-8d04-6946cdfb174a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">An affected owner must make a claim for compensation to a local government within—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.31-ssec.6-para1.a" guid="_1e4a0645-be73-4a8d-baef-dc9232630241" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for subsection (2)—2 years after the adverse planning change has effect; or</txt></block></li><li id="sec.31-ssec.6-para1.b" guid="_774ea96d-4103-48b5-8b48-24e9db2f17ec" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for subsection (3) or (4)—6 months after notice of the decision under subsection (3)(c) or (4) is given to the affected owner.</txt></block></li></list></block></subclause></clause><clause id="sec.32" guid="_6d554ef6-50b3-42bf-82ca-e64535be57ac" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>32</no><heading id="sec.32-he" guid="_b5d13f4d-a246-4370-aaa9-0b3feb88979d">Deciding compensation claim</heading><subclause id="sec.32-ssec.1" guid="_eff3ced0-3310-46e9-a8bd-c098dc96752d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">If an affected owner makes a compensation claim to a local government, the local government must decide—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.32-ssec.1-para1.a" guid="_9782ad49-20d7-495f-95ed-9e47720b6aed" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">to approve all or part of the claim; or</txt></block></li><li id="sec.32-ssec.1-para1.b" guid="_19b1c9dc-0e10-43be-b184-49d54e69f5ce" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">to refuse the claim; or</txt></block></li><li id="sec.32-ssec.1-para1.c" guid="_412fda62-1336-4197-bbee-bb9ee07c1500" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">if the claim relates to a public purpose change—to give a notice of intention to resume the affected owner’s interest in premises under the Acquisition Act, section 7.</txt></block></li></list></block></subclause><subclause id="sec.32-ssec.2" guid="_840cf19a-990f-4368-9057-b0862d392b99" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">If the claim relates to a public purpose change, the local government may also decide to amend the planning scheme to allow premises to be used for the purposes that the premises could be used for under the superseded planning scheme.</txt></block></subclause><subclause id="sec.32-ssec.3" guid="_0041fdfe-661b-44b0-9b48-49f957ce42c7" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The local government’s chief executive officer must, within 70 business days after the claim is made, give the affected owner—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.32-ssec.3-para1.a" guid="_4bd82c58-7f47-44d9-add8-06e8afeaefad" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if subsection (1)(c) applies—the notice of intention to resume; or</txt></block></li><li id="sec.32-ssec.3-para1.b" guid="_5a1661b5-7faa-4743-a267-d1ab0c31ab04" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">otherwise—a notice that states—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.32-ssec.3-para1.b-para2.i" guid="_5fe34884-dfba-4796-ad95-3f2044745c93" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the local government’s decision; and</txt></block></li><li id="sec.32-ssec.3-para1.b-para2.ii" guid="_dbe108c4-858f-4eec-949a-8d5da398ce54" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">if the local government decides to approve all or part of the claim—the amount of compensation to be paid; and</txt></block></li><li id="sec.32-ssec.3-para1.b-para2.iii" guid="_4732d404-c450-41c6-b04d-81ccf1f6eb67" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">the affected owner’s appeal rights.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.32-ssec.4" guid="_6c3d9c60-ce93-4c40-b2c4-4a8b8fe42821" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">If a notice of intention to resume is withdrawn or lapses, the local government’s chief executive officer must comply with subsection (3)(b), within 20 business days after the notice of intention to resume is withdrawn or lapses.</txt></block></subclause><subclause id="sec.32-ssec.5" guid="_eb1da66a-cae1-4589-a8ca-0b3a7fceac5a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">If the local government approves all or part of the claim, the local government must pay the compensation within 30 business days after—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.32-ssec.5-para1.a" guid="_cb00bfa0-65e2-44d8-a8a4-973de8821e6e" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if the decision is not appealed—the appeal period ends; or</txt></block></li><li id="sec.32-ssec.5-para1.b" guid="_55cc7166-5a9b-4d31-92f3-16a831d76916" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the decision is appealed—the appeal ends.</txt></block></li></list></block></subclause></clause><clause id="sec.33" guid="_12b7e9ad-f763-4e33-8060-8041689e2eaa" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>33</no><heading id="sec.33-he" guid="_9edb5bd4-4bf1-4b5f-850f-515f5deb7ee6">Amount of compensation payable</heading><subclause id="sec.33-ssec.1" guid="_d2bda3c8-5f31-4042-b59c-064b7866bf2c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The amount of compensation payable to the affected owner is the difference between the market value of the owner’s interest in premises immediately before, and immediately after, the adverse planning change.</txt></block></subclause><subclause id="sec.33-ssec.2" guid="_1ada20e3-7ef1-408b-8f77-34db1a1dd0e9" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">When deciding the market value immediately after the adverse planning change, the local government must consider—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.33-ssec.2-para1.a" guid="_fb3e3b30-d658-435f-a1c1-337e52ee1d2f" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">any benefit to the owner’s interest in the premises, or in neighbouring premises, because of the adverse planning change; and</txt><note id="sec.33-ssec.2-para1.a-note" guid="_0d3444c2-2968-4b0c-9da3-358e052ee5ec" type="example"><heading id="sec.33-ssec.2-para1.a-note-he" guid="_3e836465-5996-4991-b548-09602cc8672e">Example—</heading><block status="uncommenced"><txt break.before="1">the likelihood of improved amenity in the locality of the premises</txt></block></note></block></li><li id="sec.33-ssec.2-para1.b" guid="_1cfa26d1-5c8d-4165-9b3b-f7f1e4290ca3" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">	any benefit to the owner’s interest in neighbouring premises because, after the adverse planning change but before the compensation claim was made—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.33-ssec.2-para1.b-para2.i" guid="_94ecdbb0-b09f-4580-a50a-cf5fe0eade12" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">another planning change started to have effect; or</txt></block></li><li id="sec.33-ssec.2-para1.b-para2.ii" guid="_1c024358-93e6-48e8-8ce5-6f343d638db9" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">infrastructure, other than infrastructure that the owner funds, was constructed or improved on the neighbouring premises; and</txt></block></li></list></block></li><li id="sec.33-ssec.2-para1.c" guid="_e747ac3c-f8aa-4922-b936-d6e196e98ee0" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">any conditions or other limitations that might reasonably have applied to development of the premises under the superseded planning scheme; and</txt></block></li><li id="sec.33-ssec.2-para1.d" guid="_3c809227-9601-41cf-8bac-b4ac43441c0a" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">for an adverse planning change that was the subject of a superseded planning scheme request—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.33-ssec.2-para1.d-para2.i" guid="_0ac0f2bb-47d7-4717-b2f3-206f0fde81cf" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the effect of any other planning change that started to have effect after the adverse planning change but before the superseded planning scheme request was made; and</txt></block></li><li id="sec.33-ssec.2-para1.d-para2.ii" guid="_2fae5a22-4a1a-4eb5-87a2-41806461a278" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the effect of any development approval mentioned in section 31(3)(c)(ii) or (iii).</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.33-ssec.3" guid="_6c09484d-a179-4cfd-83ed-63b84b4ab0e1" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">However, the local government must not consider the effect of—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.33-ssec.3-para1.a" guid="_245d410d-0825-403b-89e5-b98411e52f48" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">any TLPI; or</txt></block></li><li id="sec.33-ssec.3-para1.b" guid="_d482c523-152f-4ae1-88f2-8d55ec3462cb" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the land being joined with, or separated from, other land.</txt></block></li></list></block></subclause></clause><clause id="sec.34" guid="_86daff77-afdd-4af0-b985-414b53adb939" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>34</no><heading id="sec.34-he" guid="_a6b4af1f-6e81-4950-8db0-66b95a2e1d03">Recording payment of compensation on title</heading><subclause id="sec.34-ssec.1" guid="_2d665173-9340-469e-b555-852de5036f24" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if the local government pays compensation to the affected owner of an interest in premises.</txt></block></subclause><subclause id="sec.34-ssec.2" guid="_53fdbc6d-cffd-4ca8-9b12-ba1f772387a6" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The chief executive officer of the local government must give notice of the payment of the compensation to the following person (the <defterm id="sec.34-def.recorder" guid="_6ace2487-d322-4aff-8002-ace46f80871a" type="definition">recorder</defterm>)—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.34-ssec.2-para1.a" guid="_79cb3887-c7ab-4e75-980c-eed0675c3f1e" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">to the extent the interest in the premises is recorded on the freehold land register under the <legref jurisd="QLD" type="act" check="unknown">Land Title Act</legref>—the registrar of titles under that Act;</txt></block></li><li id="sec.34-ssec.2-para1.b" guid="_53bfd375-c5b2-4c97-98f4-9673f464217a" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">to the extent the interest in the premises is recorded on a register under the <legref jurisd="QLD" type="act" check="unknown">Land Act</legref>—the chief executive under that Act.</txt></block></li></list></block></subclause><subclause id="sec.34-ssec.3" guid="_2f98f5c9-22e2-4058-89aa-22fa180dcfa6" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The notice must be in the form approved by the recorder.</txt></block></subclause><subclause id="sec.34-ssec.4" guid="_2b028ffb-c17d-4494-9feb-3467aa8d38f4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The recorder must keep the information in the notice under—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.34-ssec.4-para1.a" guid="_705eaa29-a3e6-4cdb-bc20-dae8ee86ab15" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">to the extent the interest in the premises is recorded on the freehold land register under the <legref jurisd="QLD" type="act" check="unknown">Land Title Act</legref>—section 34 of that Act; or</txt></block></li><li id="sec.34-ssec.4-para1.b" guid="_e6c8cd3e-201d-4b40-86b3-8728a8993de2" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">to the extent the interest in the premises is recorded on a register under the <legref jurisd="QLD" type="act" check="unknown">Land Act</legref>—section 281 of that Act.</txt></block></li></list></block></subclause></clause></division></part><part id="ch.2-pt.5" guid="_aea73ec3-99fd-4b8d-bf6b-c616811fe0d3" status="uncommenced" affected.by.uncommenced="0"><no>Part 5</no><heading id="ch.2-pt.5-he" guid="_adc51f5c-c698-452d-bc18-9cd266d33aeb">Designation of premises for development of infrastructure</heading><clause id="sec.35" guid="_12e5516a-3dd4-44b2-bf51-4a69f685e63f" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>35</no><heading id="sec.35-he" guid="_7540e410-ea40-42f5-9c15-afa4a60b76cc">What is a designation</heading><subclause id="sec.35-ssec.1" guid="_6af641d4-37b7-463a-ab86-67286cda8b6b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A <defterm id="sec.35-def.designation" guid="_e5451205-afd6-4c8a-9f66-df198162e383" type="definition">designation</defterm> is a decision of the Minister, or a local government, (a <defterm id="sec.35-def.designator" guid="_849a7431-4ce8-4015-9da6-d865b5517e20" type="definition">designator</defterm>) that identifies premises for the development of 1 or more types of infrastructure that are prescribed by regulation.</txt></block></subclause><subclause id="sec.35-ssec.2" guid="_331a8bd0-a744-479f-a376-377ef18e440a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">A designation may include requirements about any or all of the following—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.35-ssec.2-para1.a" guid="_b3a3719b-20a4-4730-b61e-e9f4e1ee3e75" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">works for the infrastructure (the height, shape, bulk, landscaping, or location of works, for example);</txt></block></li><li id="sec.35-ssec.2-para1.b" guid="_168f28fd-aabb-48f1-bf66-40ebe75e2345" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the use of premises, for example—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.35-ssec.2-para1.b-para2.i" guid="_b5d724c8-7c61-47e6-a5e2-5dea563f9245" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">vehicular and pedestrian access to, and circulation on, premises; and</txt></block></li><li id="sec.35-ssec.2-para1.b-para2.ii" guid="_16e7f6f2-586d-4424-bdd8-7db854d3d142" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">operating times for the use; and</txt></block></li><li id="sec.35-ssec.2-para1.b-para2.iii" guid="_2dc789ab-a7ee-4e05-942a-b0747ad5a872" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">ancillary uses;</txt></block></li></list></block></li><li id="sec.35-ssec.2-para1.c" guid="_32f11531-1709-4ac6-ae18-712b5c11b450" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">lessening the impact of the works or use (environmental management procedures, for example).</txt></block></li></list></block></subclause><subclause id="sec.35-ssec.3" guid="_7b0cbe74-eb9e-4e7c-a6cd-b4e863d8b5eb" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The chief executive may, by notice, require a local government to include a matter in subsection (2) in a designation made by the local government.</txt><note id="sec.35-ssec.3-note" guid="_89e2be96-0cf8-47a8-bbcc-55d9aa0ee188" type="example"><heading id="sec.35-ssec.3-note-he" guid="_6e881bf6-290d-4e56-90fc-3dc6035e42a1">Note—</heading><block status="uncommenced"><txt break.before="1">For the effect of a designation on the categorisation of development, see section 44(6)(b).<b/></txt></block></note></block></subclause></clause><clause id="sec.36" guid="_c79f046d-cf73-4370-b08c-ffc6f3100803" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>36</no><heading id="sec.36-he" guid="_11a4c8e8-7b00-4f53-a204-c154c0ba705b">Criteria for making or amending designations</heading><subclause id="sec.36-ssec.1" guid="_ea46a998-71f6-4543-bd3f-23b63861a9b4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">To make a designation, a designator must be satisfied that—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.36-ssec.1-para1.a" guid="_dd694f2c-72e6-406a-bc27-61ae9174af87" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the infrastructure will satisfy statutory requirements, or budgetary commitments, for the supply of the infrastructure; or</txt></block></li><li id="sec.36-ssec.1-para1.b" guid="_701be660-4434-4050-be98-33696f247e25" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">there is or will be a need for the efficient and timely supply of the infrastructure.</txt></block></li></list></block></subclause><subclause id="sec.36-ssec.2" guid="_84f28cd3-b164-427e-aa2c-16071fadab21" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">To make or amend a designation, if the designator is the Minister, the Minister must also be satisfied that adequate environmental assessment, including adequate consultation, has been carried out in relation to the development that is the subject of the designation or amendment.</txt></block></subclause><subclause id="sec.36-ssec.3" guid="_b1c3837d-5c54-4be0-86e9-5b349e291528" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The Minister may, in guidelines prescribed by regulation, set out the process for the environmental assessment and consultation.</txt></block></subclause><subclause id="sec.36-ssec.4" guid="_fa0006ee-3dba-4731-b1fb-36d4d351998e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The Minister is taken to be satisfied of the matters in subsection (2) if the process in the guidelines is followed.</txt></block></subclause><subclause id="sec.36-ssec.5" guid="_e2ec9e36-6738-479d-bf93-065d63b92336" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">However, the Minister may be satisfied of the matters in another way.</txt></block></subclause><subclause id="sec.36-ssec.6" guid="_b7f289a5-4bff-48c3-9acb-f61fe14048fd" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">Sections 10 and 11 apply to the making or amendment of the guidelines as if the guidelines were a State planning policy.</txt></block></subclause><subclause id="sec.36-ssec.7" guid="_c59cf6e6-cce3-4f0d-a57a-dbeb3e781ba5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">To make or amend a designation, a designator must have regard to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.36-ssec.7-para1.a" guid="_db5aae73-7159-41f0-a9b0-77aa0773f8c9" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">all planning instruments that relate to the premises; and</txt></block></li><li id="sec.36-ssec.7-para1.b" guid="_9dd5c1e3-464d-48f9-b426-475c2deb17af" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">any assessment benchmarks, other than in planning instruments, that relate to the development that is the subject of the designation or amendment; and</txt></block></li><li id="sec.36-ssec.7-para1.c" guid="_279110d8-c605-4caa-b07d-a311a82fa825" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">if the premises are in a State development area under the State Development Act—any approved development scheme for the premises under that Act; and</txt></block></li><li id="sec.36-ssec.7-para1.d" guid="_9405b3c0-80f5-4740-9976-ac9fa38344c6" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">any properly made submissions made as part of the consultation carried out under section 37; and</txt></block></li><li id="sec.36-ssec.7-para1.e" guid="_37fb88bd-5290-448d-93fb-a9067657690c" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">the written submissions of any local government.</txt></block></li></list></block></subclause></clause><clause id="sec.37" guid="_b1b43427-68c6-4d13-a9ec-4c9da7c19698" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>37</no><heading id="sec.37-he" guid="_31d0b0c1-1866-4d48-979e-d29c2263007c">Process for making or amending designation</heading><subclause id="sec.37-ssec.1" guid="_73283224-7771-42eb-8df8-2908db0325bc" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section is about the process for—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.37-ssec.1-para1.a" guid="_52827fb6-4318-4d68-80b3-9c1f1436bd3b" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">making a designation for premises; or</txt></block></li><li id="sec.37-ssec.1-para1.b" guid="_134632f5-3005-4945-abd6-0fb91a5daba3" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">amending a designation for premises, including by amending—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.37-ssec.1-para1.b-para2.i" guid="_7f725792-3e61-4e2f-a0a6-6c9e2108965d" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the area of the premises; or</txt></block></li><li id="sec.37-ssec.1-para1.b-para2.ii" guid="_7d9aecef-fb91-4387-aeb7-b916f3fa4874" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the type of infrastructure for which the premises were designated.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.37-ssec.2" guid="_9464b23c-7426-4491-b5a8-a855ca454e9c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">If the Minister proposes to make or amend a designation, the Minister must give notice of the proposal to the affected parties.</txt></block></subclause><subclause id="sec.37-ssec.3" guid="_c27d08f3-a715-49db-8fce-9c390dcf7fe6" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">However, the Minister need not give the notice to an owner of premises if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.37-ssec.3-para1.a" guid="_94d3bdf7-bda8-43ed-baa7-9c6acd4f4ae3" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a notice has already been given to the owner as part of the consultation for an assessment under section 36(2); or</txt></block></li><li id="sec.37-ssec.3-para1.b" guid="_b8f81340-74de-4e52-bcf4-4ef947f0faff" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the Minister can not notify the owner after making reasonable efforts.</txt></block></li></list></block></subclause><subclause id="sec.37-ssec.4" guid="_49351fe8-7f89-40f1-94ed-dbc2c0238f47" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The notice must invite the affected parties to make submissions about the proposal to the Minister within a period of at least 15 business days after the notice is given.</txt></block></subclause><subclause id="sec.37-ssec.5" guid="_9b2ae1cc-6b40-4caf-bd34-304530223f0e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">If, after considering any properly made submissions, the Minister decides not to proceed with the proposal, the Minister must give a decision notice to the affected parties.</txt></block></subclause><subclause id="sec.37-ssec.6" guid="_88df1344-3c5a-4f82-b7ec-d64a9f656882" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">If a local government proposes to make or amend a designation, the local government must follow the process in the designation process rules, before the local government makes or amends the designation.</txt></block></subclause><subclause id="sec.37-ssec.7" guid="_9ddce92a-3a02-413b-89c2-778d1b467de3" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">Sections 10 and 11 apply to the making or amendment of the designation process rules as if the designation process rules were a State planning policy.</txt></block></subclause><subclause id="sec.37-ssec.8" guid="_44d4e1f1-87e7-41b5-ab52-94386692917e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(8)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.37-ssec.8-def.designationprocessrules_" guid="_f8399dd5-28bb-41b8-8fc7-17d93cc7f6a7" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.37-ssec.8-def.designationprocessrules" guid="_2f0ac7e5-292d-48d9-b20a-fac613d84851" type="definition">designation process rules</defterm> means rules made by the Minister and prescribed by regulation.</txt></definition></deflist></block></subclause></clause><clause id="sec.38" guid="_2369eef1-1c7e-4cce-b44a-85092499dfaf" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>38</no><heading id="sec.38-he" guid="_09d6cd09-5293-42c7-90df-3d340055a394">Process after making or amending designation</heading><subclause id="sec.38-ssec.1" guid="_b4af9476-eb9a-4d99-bbb1-66ded3a69b6c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">If, after considering any properly made submissions, the designator decides to make or amend a designation, the designator must publish a gazette notice that states—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.38-ssec.1-para1.a" guid="_70c342a9-4887-4bbe-8cd2-283d6a55bf06" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">that the designation has been made or amended; and</txt></block></li><li id="sec.38-ssec.1-para1.b" guid="_5e7e152e-69d8-4482-9a7d-8cd3f03c1fed" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a description of the designated premises; and</txt></block></li><li id="sec.38-ssec.1-para1.c" guid="_974fc1ba-0bd0-4fd0-8609-b96a663a0646" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the type of infrastructure for which the premises were designated; and</txt></block></li><li id="sec.38-ssec.1-para1.d" guid="_0f30c1b8-532e-45ae-878a-c36c2356c569" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">for an amendment—the nature of the amendment.</txt></block></li></list></block></subclause><subclause id="sec.38-ssec.2" guid="_52b7edd1-9fe9-4f60-ad78-6f581bff2ed7" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The designator must give the following things to each affected party and the chief executive—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.38-ssec.2-para1.a" guid="_3ecc6816-97e4-4082-b513-0c5b146c97fc" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a copy of the gazette notice;</txt></block></li><li id="sec.38-ssec.2-para1.b" guid="_fe3f7121-b904-4edc-aaf9-0a2d5e49bfc9" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a notice of any requirements included in the designation under section 35(2);</txt></block></li><li id="sec.38-ssec.2-para1.c" guid="_4e101eab-f538-4307-9c2b-d95645c0ffd1" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">a notice of how the designator dealt with any properly made submissions.</txt></block></li></list></block></subclause></clause><clause id="sec.39" guid="_8d8d11f0-94bb-4bf5-9cd4-16f361969d14" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>39</no><heading id="sec.39-he" guid="_c99563ab-eff5-4e78-89a9-db514fcc7a30">Duration of designation</heading><subclause id="sec.39-ssec.1" guid="_95f911bd-525a-4c5e-b0ac-2ff5f3c94f15" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A designation stops having effect on the day (the <defterm id="sec.39-def.endday" guid="_c6346f7f-e253-445c-a95c-67a69c30ada5" type="definition">end day</defterm>) that is 6 years after the designation starts to have effect, unless—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.39-ssec.1-para1.a" guid="_91ec51ea-1819-4871-81ef-c9757a4c6638" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">on the end day—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.39-ssec.1-para1.a-para2.i" guid="_2d7baac7-7e25-4612-8ab7-6e8802c558b8" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a public sector entity owns, or has an easement for the same purpose as the designation over, the designated premises; or</txt></block></li><li id="sec.39-ssec.1-para1.a-para2.ii" guid="_11376f2b-f6cc-4bb0-be5b-992c14c10ed2" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">another entity owns, or has an easement over, the designated premises and construction of the infrastructure for which the premises were designated started before the end day; or</txt></block></li></list></block></li><li id="sec.39-ssec.1-para1.b" guid="_aeeb180c-8046-4355-bd7b-726c0d73e6d1" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">before the end day—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.39-ssec.1-para1.b-para2.i" guid="_583a3f6c-7484-4df6-9b7c-1ae07a88f6a1" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a public sector entity gave a notice of intention to resume the designated premises under the Acquisition Act, section 7; or</txt></block></li><li id="sec.39-ssec.1-para1.b-para2.ii" guid="_b3566386-3f9e-4e41-90c7-bbd1bd3f46a9" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">a public sector entity signed an agreement to take designated premises under the Acquisition Act or to otherwise buy the premises; or</txt></block></li><li id="sec.39-ssec.1-para1.b-para2.iii" guid="_ad5b4021-9ee3-4ce9-819d-3b3d698063e3" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">the designator complies with subsection (3).</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.39-ssec.2" guid="_5b8aa155-0089-4acd-bb1f-0a16f8c598f6" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The designator may extend the duration of a designation, for up to 6 years, by publishing a gazette notice about the extension before the designation stops having effect.</txt></block></subclause><subclause id="sec.39-ssec.3" guid="_df36771a-d9d0-46df-9361-84ce73b61b20" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The designator must give notice of the extension of the designation to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.39-ssec.3-para1.a" guid="_7fb82b33-88b7-4b63-bda3-d38a2090d495" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if the Minister is the designator—each of the affected parties and the chief executive; or</txt></block></li><li id="sec.39-ssec.3-para1.b" guid="_f665e228-a50b-461f-8a87-786ee281b672" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if a local government is the designator—the owner of the premises and the chief executive.</txt></block></li></list></block></subclause><subclause id="sec.39-ssec.4" guid="_1b5d2ebd-e4b7-4750-8e8b-81de44e200a2" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">If a public sector entity discontinues proceedings to resume designated premises, either before or after the end day, the designation stops having effect on the day when the proceedings are discontinued.</txt></block></subclause></clause><clause id="sec.40" guid="_754f6e2b-7e30-48a7-8aa7-7224cc38df4c" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>40</no><heading id="sec.40-he" guid="_14aa73e6-44ad-4ae9-aa7c-074760dd8c82">Repealing designation—designator</heading><subclause id="sec.40-ssec.1" guid="_0d1c4b7a-42da-4e34-bfae-3433a336175d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A designator may repeal a designation made by the designator by publishing a gazette notice that states—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.40-ssec.1-para1.a" guid="_22e03b2c-a425-4496-bf69-5e74cd3ca355" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">that the designation is repealed; and</txt></block></li><li id="sec.40-ssec.1-para1.b" guid="_ed4f9fc0-e261-458c-80c5-707cd6f65d0e" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a description of the designated premises; and</txt></block></li><li id="sec.40-ssec.1-para1.c" guid="_733e67f3-ddbb-4a49-b408-392e8ba1b3fc" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the type of infrastructure for which the premises were designated; and</txt></block></li><li id="sec.40-ssec.1-para1.d" guid="_c7830eb3-44f1-4c75-aaba-50eeb37d8434" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">the reasons for the repeal.</txt></block></li></list></block></subclause><subclause id="sec.40-ssec.2" guid="_2fbad3c8-287a-4807-8323-bf4bf5273ee1" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The designator must give a copy of the notice to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.40-ssec.2-para1.a" guid="_1f8ad444-4e76-45dc-a310-b07e12b07ec9" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if the Minister is the designator—each of the affected parties and the chief executive; or</txt></block></li><li id="sec.40-ssec.2-para1.b" guid="_9fc4a3e9-afac-4530-b85d-85c00b7c3d1b" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if a local government is the designator—the owner of the premises and the chief executive.</txt></block></li></list></block></subclause><subclause id="sec.40-ssec.3" guid="_bc8609e1-a3f5-4527-b838-0fb04f1115c4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">Any development started under the designation may be completed as if the designation had not been repealed.</txt></block></subclause><subclause id="sec.40-ssec.4" guid="_4a2fee4b-8774-4fac-81a5-09c1c8c3f19c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">Subject to any requirements under section 35(2), a use of the premises that is the natural and ordinary consequence of the development is taken to be a lawful use.</txt></block></subclause></clause><clause id="sec.41" guid="_3f6bcea4-596d-4365-9127-0cd8259f84f3" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>41</no><heading id="sec.41-he" guid="_1ded672d-4f90-4d1f-8cb1-ee53584838e2">Repealing designation—owner’s request</heading><subclause id="sec.41-ssec.1" guid="_5954ed7c-1992-477f-a110-c9c3654c5f63" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">An owner of an interest in designated premises may request a designator to repeal a designation made by the designator on the basis that the designation is causing the owner hardship.</txt></block></subclause><subclause id="sec.41-ssec.2" guid="_15514e69-927f-455a-bf70-512d3c2cf5b0" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">Subsection (1) does not apply if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.41-ssec.2-para1.a" guid="_ec26f8a7-71e0-487f-b85a-9e0f2807403c" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the premises are subject to an easement for the infrastructure for which the premises are designated; or</txt></block></li><li id="sec.41-ssec.2-para1.b" guid="_48018128-83a7-441e-86af-d3c2f2752d0c" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the designation also applies to other premises and relates to a land corridor for the infrastructure; or</txt></block></li><li id="sec.41-ssec.2-para1.c" guid="_378b630a-1e62-419a-bf75-ed1985c01640" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the premises are a road.</txt></block></li></list></block></subclause><subclause id="sec.41-ssec.3" guid="_e1502e0e-ef5d-4910-9599-b91e2e7c1a2e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The request must be in writing, and contain any information that the guidelines made under section 36(3) require.</txt></block></subclause><subclause id="sec.41-ssec.4" guid="_6c7cbb3a-8117-4bf7-b77f-8a06a5438a8f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The designator must, within 40 business days after receiving the request—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.41-ssec.4-para1.a" guid="_9a13f99d-219e-417d-a4c7-8a0f698b4704" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">repeal the designation, using the process under section 40; or</txt></block></li><li id="sec.41-ssec.4-para1.b" guid="_618cb9b0-f313-42b7-867b-7c76e4b53425" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">decide to refuse the request; or</txt></block></li><li id="sec.41-ssec.4-para1.c" guid="_8d523b73-1216-4d70-9c64-4ddd7fe9ff3f" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">decide to take other action that the designator considers appropriate in the circumstances.</txt></block></li></list></block></subclause><subclause id="sec.41-ssec.5" guid="_58bf8038-a875-4d29-aedd-9e879d1ad929" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The designator must, within 5 business days after making a decision under subsection (4)(b) or (c), give a decision notice to the owner.</txt></block></subclause></clause><clause id="sec.42" guid="_42bd6ac8-cf36-41f9-87e8-c3b8773fa3e2" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>42</no><heading id="sec.42-he" guid="_2ecaea34-9602-4054-ab91-a31eac8bc312">Noting designation in planning scheme</heading><subclause id="sec.42-ssec.1" guid="_7a4a84a5-3193-4b26-ac07-1f5372dc4cd2" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if a local government—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.42-ssec.1-para1.a" guid="_a94a5b48-9c6e-4895-bca4-78e747fa515b" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">makes, amends, extends or repeals a designation; or</txt></block></li><li id="sec.42-ssec.1-para1.b" guid="_c8e5e57a-0cd6-4824-8950-0f989f4d7ea6" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">receives a notice about the Minister making, amending, extending or repealing a designation.</txt></block></li></list></block></subclause><subclause id="sec.42-ssec.2" guid="_99ecb4c8-8d5d-437d-a41e-68544c81ecf9" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The local government must include a note about the making, amendment, extension or repeal in—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.42-ssec.2-para1.a" guid="_c690edab-4e87-4f43-8b59-566656c70939" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the local government’s planning scheme; and</txt></block></li><li id="sec.42-ssec.2-para1.b" guid="_69cc8363-1b30-4098-806e-73a912d122d9" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">any planning scheme that the local government makes before the designation stops having effect.</txt></block></li></list></block></subclause><subclause id="sec.42-ssec.3" guid="_e111ee6e-d219-41f0-bf29-bf42a5257956" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The note must—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.42-ssec.3-para1.a" guid="_a6d4883f-1dac-42a6-ab1c-298977442049" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">identify the premises that were designated; and</txt></block></li><li id="sec.42-ssec.3-para1.b" guid="_51011ddf-ec1b-408a-9c89-2ae73b669f6b" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">describe the type of infrastructure for which the premises were designated; and</txt></block></li><li id="sec.42-ssec.3-para1.c" guid="_ebe7aac3-2087-4efc-b167-bb6071ebe6d8" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">state the day when the designation, amendment, extension or repeal started to have effect.</txt></block></li></list></block></subclause><subclause id="sec.42-ssec.4" guid="_0230204e-e125-48d1-95bd-465736206310" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The local government must include the note in the planning scheme in a way that ensures the other provisions of the scheme that apply to the designated premises remain effective.</txt></block></subclause><subclause id="sec.42-ssec.5" guid="_1fab1b0f-7238-4620-9e1d-6b3d19f8e7f4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">To remove any doubt, it is declared that—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.42-ssec.5-para1.a" guid="_430d6b06-71d2-4682-bb88-df7e4dfa2bf6" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the note is not an amendment of a planning scheme; and</txt></block></li><li id="sec.42-ssec.5-para1.b" guid="_b4348fb1-b05d-4c4e-939b-d2490622dc07" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a designation is taken to be part of a planning scheme; and</txt></block></li><li id="sec.42-ssec.5-para1.c" guid="_3791da1c-64e1-4d5a-98ae-8b7cb9a4fcf0" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">a designation is not the only way that a planning scheme may identify infrastructure; and</txt></block></li><li id="sec.42-ssec.5-para1.d" guid="_bb616b29-9645-4409-b0ec-871e88d68608" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">a designation does not affect the provisions of a planning scheme that apply to designated premises, even after the designation stops having effect.</txt></block></li></list></block></subclause></clause></part></chapter><chapter id="ch.3" guid="_42229283-823c-4a26-99f7-756eab8a5578" status="uncommenced" affected.by.uncommenced="0"><no>Chapter 3</no><heading id="ch.3-he" guid="_681cae65-3a80-473f-8f4f-082b57e60fc7">Development assessment</heading><part id="ch.3-pt.1" guid="_51b3b014-282a-4a30-93e4-fbca1a092045" status="uncommenced" affected.by.uncommenced="0"><no>Part 1</no><heading id="ch.3-pt.1-he" guid="_038e71cd-fad7-4dd8-9fc8-8f754d92e742">Types of development and assessment</heading><clause id="sec.43" guid="_ef570753-1046-4935-b3fb-e0bad617418e" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>43</no><heading id="sec.43-he" guid="_ca0d3d10-d985-4063-9f06-08e8809df049">Categorising instruments</heading><subclause id="sec.43-ssec.1" guid="_6c434011-34ab-41fe-b188-ec820bf11bc3" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A <defterm id="sec.43-def.categorisinginstrument" guid="_7ed6520e-77eb-495a-a671-2f95ac644601" type="definition">categorising instrument</defterm> is a regulation or local categorising instrument that does any or all of the following—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.43-ssec.1-para1.a" guid="_e5c51221-1fa4-44fe-9b18-634169e62971" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">categorises development as prohibited, assessable or accepted development;</txt></block></li><li id="sec.43-ssec.1-para1.b" guid="_2559fd8c-17a9-4457-95be-45f9bc4d7574" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">specifies the categories of assessment required for different types of assessable development;</txt></block></li><li id="sec.43-ssec.1-para1.c" guid="_df0b7e36-8503-4bf7-9f90-0c3f424a9ccb" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">sets out the matters (the <defterm id="sec.43-ssec.1-def.assessmentbenchmarks" guid="_9beb295a-cd6b-467a-bbaa-c4a4201e62d5" type="definition">assessment benchmarks</defterm>) that an assessment manager must assess assessable development against.</txt></block></li></list></block></subclause><subclause id="sec.43-ssec.2" guid="_e0f85b5a-cf54-493e-bb3f-384e4bad6e7c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">An assessment benchmark does not include—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.43-ssec.2-para1.a" guid="_d288ceab-731a-4734-938e-b5693eca0338" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a matter of a person’s opinion; or</txt></block></li><li id="sec.43-ssec.2-para1.b" guid="_7730b42a-5dbc-4b3e-882b-d04ceeae251e" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a person’s circumstances, financial or otherwise; or</txt></block></li><li id="sec.43-ssec.2-para1.c" guid="_0c0a98f3-ee96-4c79-8722-c36ebed1df2f" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">for code assessment—a strategic outcome under section 16(1)(a); or</txt></block></li><li id="sec.43-ssec.2-para1.d" guid="_a9fa3ede-b507-4dd0-83b5-8b1a4078a0f1" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">a matter prescribed by regulation.</txt></block></li></list><note id="sec.43-ssec.2-note" guid="_689dbf46-dd9b-4056-8cb2-a178f0c21b78" type="example"><heading id="sec.43-ssec.2-note-he" guid="_2c483402-d1d5-4d8f-959b-577474188f75">Examples of assessment benchmarks—</heading><block status="uncommenced"><txt break.before="1">a code, a standard, or an expression of the intent for a zone or precinct</txt></block></note></block></subclause><subclause id="sec.43-ssec.3" guid="_d580c83b-cb57-4d0b-8073-976437659008" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">A <defterm id="sec.43-def.localcategorisinginstrument" guid="_ab5f59f1-487a-4e22-918a-6dc74c112c3c" type="definition">local categorising instrument</defterm> is—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.43-ssec.3-para1.a" guid="_12a0a8ab-d2f2-4392-8bf2-f985d1249ecc" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a planning scheme; or</txt></block></li><li id="sec.43-ssec.3-para1.b" guid="_59df198c-fa3f-44d5-b2ef-b90fd4704410" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a TLPI; or</txt></block></li><li id="sec.43-ssec.3-para1.c" guid="_755fb2e0-dd00-4624-85eb-99e987c2d7bb" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">a variation approval, to the extent the variation approval does any of the things mentioned in subsection (1).</txt></block></li></list></block></subclause><subclause id="sec.43-ssec.4" guid="_b5588ab0-8967-457b-a19c-6a13e46ed348" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">A regulation made under subsection (1) applies instead of a local categorising instrument, to the extent of any inconsistency.</txt></block></subclause><subclause id="sec.43-ssec.5" guid="_015371ea-6798-4a7a-b34a-75f1d4bfefce" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">A local categorising instrument—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.43-ssec.5-para1.a" guid="_381339ac-6587-4969-827b-a56ae7025001" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">may state that development is prohibited development only if a regulation allows the local categorising instrument to do so; and</txt></block></li><li id="sec.43-ssec.5-para1.b" guid="_0c7650f0-3d35-47ad-b9dc-a0b7ba5c039d" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">may not state that development is assessable development if a regulation prohibits the local categorising instrument from doing so; and</txt></block></li><li id="sec.43-ssec.5-para1.c" guid="_954a3310-57ea-4320-9095-264c79d3ee89" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">may not, in its effect, be inconsistent with the effect of a specified assessment benchmark, or a specified part of an assessment benchmark, identified in a regulation made for this paragraph.</txt></block><note id="sec.43-ssec.5-para1.c-note" guid="_e13cabd6-cb6d-4423-a99f-f042bc3982ab" type="example"><heading id="sec.43-ssec.5-para1.c-note-he" guid="_003db42f-aeb5-4baa-830b-6fd70400fb4d">Note—</heading><block status="uncommenced"><txt break.before="1">Assessment benchmarks are given effect through the rules for assessing and deciding development applications under section 45, 59 or 60.</txt></block></note></li></list></block></subclause><subclause id="sec.43-ssec.6" guid="_5b34b78c-2309-440e-86ab-b048f29c00ef" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">To the extent a local categorising instrument does not comply with subsection (5), the instrument has no effect.</txt></block></subclause><subclause id="sec.43-ssec.7" guid="_add53c88-e728-4798-ac3e-41d553bd49f4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">A variation approval may do something mentioned in subsection (1) only in relation to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.43-ssec.7-para1.a" guid="_a843ebe9-9513-4196-aa25-a028424df9b7" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">development that is the subject of the variation approval; or</txt></block></li><li id="sec.43-ssec.7-para1.b" guid="_60c2b09c-ab20-4a6b-9fa4-1e48b5f87123" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">development that is the natural and ordinary consequence of the development that is the subject of the variation approval.</txt></block></li></list></block></subclause><subclause id="sec.43-ssec.8" guid="_7cdbb686-0915-4750-bccd-d0421d953915" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(8)</no><block status="uncommenced"><txt break.before="1">Subsections (4) and (6) apply no matter when the regulation and local categorising instrument commenced in relation to each other.</txt></block></subclause></clause><clause id="sec.44" guid="_cd5aed02-abb5-4984-a10b-74e63987ca53" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>44</no><heading id="sec.44-he" guid="_d0f11f78-06cc-4144-957f-1c52e717d895">Categories of development</heading><subclause id="sec.44-ssec.1" guid="_c6f6138f-6c38-4b7c-9e6a-bce03d5e7f7f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">There are 3 categories of development, namely prohibited, assessable or accepted development.</txt></block></subclause><subclause id="sec.44-ssec.2" guid="_729324a4-14b1-4bd1-a5b8-abf1f5a8187e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1"><defterm id="sec.44-def.Prohibiteddevelopment" guid="_d56aec1a-c62c-446e-b71f-23dfc3bedadf" type="definition">Prohibited development</defterm> is development for which a development application may not be made.</txt></block></subclause><subclause id="sec.44-ssec.3" guid="_97b41501-1854-4334-926d-ca8385c3daf5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1"><defterm id="sec.44-def.Assessabledevelopment" guid="_561c1a7b-6846-472d-be95-8dfe65695c38" type="definition">Assessable development</defterm> is development for which a development approval is required.</txt></block></subclause><subclause id="sec.44-ssec.4" guid="_e9708256-ab0f-43e7-883d-025327e32693" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1"><defterm id="sec.44-def.Accepteddevelopment" guid="_20a50efd-76af-4791-a065-fa8113004c63" type="definition">Accepted development</defterm> is development for which a development approval is not required.</txt></block></subclause><subclause id="sec.44-ssec.5" guid="_6e16e7d6-3040-4d4a-a6d6-09fc1e7d413a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">A categorising instrument may categorise development.</txt></block></subclause><subclause id="sec.44-ssec.6" guid="_4eecc8ab-6acf-4301-9ffd-1d8750a4176f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">However—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.44-ssec.6-para1.a" guid="_4c5536e1-e2dd-4aa2-aefa-76241a351f8f" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if no categorising instrument categorises particular development—the development is accepted development; and</txt></block></li><li id="sec.44-ssec.6-para1.b" guid="_7910646a-a3f0-4005-9f89-0634966553c7" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">development in relation to infrastructure under a designation is—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.44-ssec.6-para1.b-para2.i" guid="_2a34fef8-5212-4d30-8ca5-224ea7cb6323" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">to the extent the development is building work under the Building Act—the category of development stated for the building work under a regulation; or</txt></block></li><li id="sec.44-ssec.6-para1.b-para2.ii" guid="_bb3efe49-23df-4313-aae0-77f0d4d5b0c7" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">otherwise—accepted development.</txt></block></li></list></block></li></list></block></subclause></clause><clause id="sec.45" guid="_caa67121-7047-40e1-8e57-25e3b7da4514" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>45</no><heading id="sec.45-he" guid="_17de3d29-1fe0-4a37-addf-d1d4663e91a8">Categories of assessment</heading><subclause id="sec.45-ssec.1" guid="_d7ff227b-72a8-4b1e-a1c4-f615873be8fe" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">There are 2 categories of assessment for assessable development, namely code and impact assessment.</txt></block></subclause><subclause id="sec.45-ssec.2" guid="_a05aa9ec-f9f6-428f-8a1b-f7b0eb23a4d3" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">A categorising instrument states the category of assessment that must be carried out for the development.</txt></block></subclause><subclause id="sec.45-ssec.3" guid="_ad1135f0-f897-4141-898b-ccb10fd9c049" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">A <defterm id="sec.45-def.codeassessment" guid="_ff1ba651-21b8-4919-9137-bdfc8f2f28f7" type="definition">code assessment</defterm> is an assessment that must be carried out only—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.45-ssec.3-para1.a" guid="_011bf795-0f11-4e30-8c1e-b79f9365b75b" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">against the assessment benchmarks in a categorising instrument for the development; and</txt></block></li><li id="sec.45-ssec.3-para1.b" guid="_fe4d1ca1-79f8-4eca-8286-37c066e4382c" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">having regard to any matters prescribed by regulation for this paragraph.</txt></block></li></list></block></subclause><subclause id="sec.45-ssec.4" guid="_6fe83104-bf57-495c-9486-74ec09d1d13c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">When carrying out code assessment, section 5(1) does not apply to the assessment manager.</txt></block></subclause><subclause id="sec.45-ssec.5" guid="_7f07b20e-0e52-412d-9df6-c616854b02e5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">An <defterm id="sec.45-def.impactassessment" guid="_35245b6b-15fd-4bb5-be96-d01ce20692c7" type="definition">impact assessment</defterm> is an assessment that—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.45-ssec.5-para1.a" guid="_d40cd745-55ef-4251-b10d-49d8b4f6fd35" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">must be carried out—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.45-ssec.5-para1.a-para2.i" guid="_fb71e4e4-4021-41c0-afd5-b46ed9bcbf0f" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">against the assessment benchmarks in a categorising instrument for the development; and</txt></block></li><li id="sec.45-ssec.5-para1.a-para2.ii" guid="_2e13e2e5-b1cd-421c-ae46-774a95a0a242" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">having regard to any matters prescribed by regulation for this subparagraph; and</txt></block></li></list></block></li><li id="sec.45-ssec.5-para1.b" guid="_68dd8709-d02a-47eb-affc-b5470b4e58c7" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">may be carried out against, or having regard to, any other relevant matter, other than a person’s personal circumstances, financial or otherwise.</txt><note id="sec.45-ssec.5-para1.b-note" guid="_05ed1ff2-7097-4113-9ed0-5760c07c202b" type="example"><heading id="sec.45-ssec.5-para1.b-note-he" guid="_c2a03055-68e5-4f3f-8594-8d4b3a635bab">Examples of another relevant matter—</heading><block status="uncommenced"><list number.type="manual" unnumbered.indent="0"><li id="sec.45-ssec.5-para1.b-note-para2" guid="_63f32db0-d544-425a-8f21-348e2ee90e2a" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">a planning need</txt></block></li><li id="sec.45-ssec.5-para1.b-note-para2-oc.2" guid="_dd13bf39-c87a-4a46-bbde-7c4a3ee285c5" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">the current relevance of the assessment benchmarks in the light of changed circumstances</txt></block></li><li id="sec.45-ssec.5-para1.b-note-para2-oc.3" guid="_c9bf83f9-e41a-49ed-9ecf-8d2fa6fdd65c" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">whether assessment benchmarks or other prescribed matters were based on material errors</txt><note id="sec.45-ssec.5-para1.b-note-para2-oc.3-note" guid="_3e6e7c0b-68d1-412d-8f2b-f632759f00d2" type="example"><heading id="sec.45-ssec.5-para1.b-note-para2-oc.3-note-he" guid="_3b8dc812-d9cf-4799-9fd3-8dfe6b9676d9">Note—</heading><block status="uncommenced"><txt break.before="1">See section 277 for the matters the chief executive must have regard to when the chief executive, acting as an assessment manager, carries out a code assessment or impact assessment in relation to a State heritage place.</txt></block></note></block></li></list></block></note></block></li></list></block></subclause><subclause id="sec.45-ssec.6" guid="_707fe9d0-2577-42f4-b5bc-43a5757b9345" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">An assessment carried out against a statutory instrument, or another document applied, adopted or incorporated (with or without changes) in a statutory instrument, must be carried out against the statutory instrument or document as in effect when the application was properly made.</txt></block></subclause><subclause id="sec.45-ssec.7" guid="_f42e5532-579e-488a-a242-f8fca5bb7526" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">However, if the statutory instrument or other document is amended or replaced before the assessment manager decides the application, the assessment manager may give the weight that the assessment manager considers is appropriate, in the circumstances, to the amendment or replacement.</txt></block></subclause></clause><clause id="sec.46" guid="_93b51265-6865-448a-bf2f-ebd95a7d4a72" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>46</no><heading id="sec.46-he" guid="_5d059b58-336d-4356-b32c-363f1cd9121b">Exemption certificate for some assessable development</heading><subclause id="sec.46-ssec.1" guid="_03fa7bd1-e6f4-4177-89c7-a497e6900396" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A development approval is not required for assessable development on premises if there is an exemption certificate for the development.</txt></block></subclause><subclause id="sec.46-ssec.2" guid="_ff8c76c3-0af8-4024-8df8-11ac81a70887" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The following persons may give an exemption certificate—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.46-ssec.2-para1.a" guid="_df11fa84-c52a-44ce-8e14-96001ffb562a" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for development for which a local government would be the assessment manager if the development, and no other development, were the subject of a development application—the local government;</txt></block></li><li id="sec.46-ssec.2-para1.b" guid="_910fc52b-f979-4ec7-ba60-a9c98aaa0780" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">otherwise—the chief executive.</txt></block></li></list></block></subclause><subclause id="sec.46-ssec.3" guid="_15cc32ed-fa73-421b-b95e-cfb825b2d92a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The person may give an exemption certificate if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.46-ssec.3-para1.a" guid="_42bece71-1cc4-4990-beed-6724073a467f" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for development for which there is a referral agency—each referral agency has agreed in writing to the exemption certificate being given; and</txt></block></li><li id="sec.46-ssec.3-para1.b" guid="_45c81695-fefd-4afa-a2f3-0ae786e17638" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">any of the following apply—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.46-ssec.3-para1.b-para2.i" guid="_4137e882-e036-4d6e-bcb0-85df59fb6bf1" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the effects of the development would be minor or inconsequential, considering the circumstances under which the development was categorised as assessable development;</txt></block></li><li id="sec.46-ssec.3-para1.b-para2.ii" guid="_0fd70900-0f9e-44a9-a5d6-f52a8ecfa29b" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the development was categorised as assessable development only because of particular circumstances that no longer apply;</txt></block></li><li id="sec.46-ssec.3-para1.b-para2.iii" guid="_3c6a0f45-3c0d-4e47-a745-11c7bc2fc4a9" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">the development was categorised as assessable development because of an error.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.46-ssec.4" guid="_c58feee6-be8b-496f-9cc8-6283fc670f36" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The person must give a copy of the exemption certificate to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.46-ssec.4-para1.a" guid="_ea2c5965-56d9-4964-8f80-c68c4dbc119c" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">each owner of the premises; and</txt></block></li><li id="sec.46-ssec.4-para1.b" guid="_fa4e6b05-67e8-45d7-8dd6-5725614993e8" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">each referral agency for the development; and</txt></block></li><li id="sec.46-ssec.4-para1.c" guid="_b04a18db-da4b-4064-8455-fa767e4e1e5b" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">if the person is the chief executive—the local government for the premises.</txt></block></li></list></block></subclause><subclause id="sec.46-ssec.5" guid="_c2ac5936-458c-4b2c-a165-8c2f799167e0" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The person must publish a notice about the person’s decision to give the exemption certificate on the person’s website.</txt></block></subclause><subclause id="sec.46-ssec.6" guid="_652ef007-5a0f-4ea2-a86e-85cb5d5f4af9" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">The notice must state—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.46-ssec.6-para1.a" guid="_99779173-baa1-4967-85f4-9c3997a9d122" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a description of the premises for which the exemption certificate was given; and</txt></block></li><li id="sec.46-ssec.6-para1.b" guid="_a60c192e-f507-4552-bea7-57e4fda73cc6" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a description of the development to which the exemption certificate relates; and</txt></block></li><li id="sec.46-ssec.6-para1.c" guid="_5e092ae2-f025-4b02-b29c-76cef285f9ca" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the reasons for giving the exemption certificate; and</txt></block></li><li id="sec.46-ssec.6-para1.d" guid="_aa2d80b5-aab2-456c-bc8c-c591d1335fde" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">any matter prescribed by regulation.</txt></block></li></list></block></subclause><subclause id="sec.46-ssec.7" guid="_ae7a446d-0ffd-495f-8df0-ce476fae0c3a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">The exemption certificate attaches to the premises and benefits each of the owners, the owners’ successors in title and any occupiers of the premises.</txt></block></subclause><subclause id="sec.46-ssec.8" guid="_3515b40c-06c1-4cd6-acd2-568883e29522" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(8)</no><block status="uncommenced"><txt break.before="1">The exemption certificate has effect for 2 years after the day the certificate was given, or a later day stated in the certificate.</txt></block></subclause><subclause id="sec.46-ssec.9" guid="_1e3fbedb-a680-418f-bb17-006b2e408672" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(9)</no><block status="uncommenced"><txt break.before="1">However, the exemption certificate may state a period, or periods, within which—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.46-ssec.9-para1.a" guid="_6d61a9c8-544d-4635-9043-84ac047b253c" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">stated development must be completed; or</txt></block></li><li id="sec.46-ssec.9-para1.b" guid="_b43c7ca1-b5f8-4021-85ab-b8b26e1e76d7" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a use that is the natural and ordinary consequence of the development must start; or</txt></block></li><li id="sec.46-ssec.9-para1.c" guid="_38515630-5328-4821-8477-97431fd64fb0" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">a plan for reconfiguring a lot that is required under a regulation to be given to the local government for its approval must be given.</txt></block></li></list></block></subclause><subclause id="sec.46-ssec.10" guid="_1d393603-0877-4acd-a7c1-56d2678fbd43" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(10)</no><block status="uncommenced"><txt break.before="1">To the extent development does not comply with a requirement stated under subsection (9), the exemption certificate has no effect.</txt></block></subclause><subclause id="sec.46-ssec.11" guid="_dba583c9-fa88-4d67-9dcc-fef833819c7e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(11)</no><block status="uncommenced"><txt break.before="1">Subject to a requirement stated under subsection (9)—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.46-ssec.11-para1.a" guid="_fdba2f07-87e1-49e1-b522-1e21a0d37927" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">any development substantially started under the exemption certificate may be completed as if the certificate had not expired; and</txt></block></li><li id="sec.46-ssec.11-para1.b" guid="_aa2d6dc5-b29b-40f1-b648-97a99f476577" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a use that is the natural and ordinary consequence of the development is taken to be a lawful use; and</txt></block></li><li id="sec.46-ssec.11-para1.c" guid="_201a261f-d40b-4465-8689-933bf4515a37" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">a development approval is not required for reconfiguring a lot that is the subject of the exemption certificate if works for the reconfiguration substantially started before the certificate expires.</txt></block></li></list></block></subclause></clause></part><part id="ch.3-pt.2" guid="_e65cbcb8-60b4-4670-9d9e-672208db8dff" status="uncommenced" affected.by.uncommenced="0"><no>Part 2</no><heading id="ch.3-pt.2-he" guid="_9d44f02e-27a1-40da-89e6-fb6d73d9e7b0">Development applications</heading><division id="ch.3-pt.2-div.1" guid="_a26a9128-daee-4b2f-9c79-87e78753dcfe" status="uncommenced" affected.by.uncommenced="0"><no>Division 1</no><heading id="ch.3-pt.2-div.1-he" guid="_ba4200a8-5e9e-41c8-8871-f1efcb2ed171">Introduction</heading><clause id="sec.47" guid="_c8c3982c-6647-4640-b2e6-1cae34df98c2" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>47</no><heading id="sec.47-he" guid="_1c0ad58f-6bd2-40bb-acdb-438437d9d316">What part is about</heading><block status="uncommenced"><txt break.before="1">This part explains how a person makes a development application to an assessment manager for a development approval to carry out assessable development.</txt></block></clause><clause id="sec.48" guid="_18996efb-5705-4ee2-ad59-aba1c5459a17" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>48</no><heading id="sec.48-he" guid="_e4e4c008-4e9b-4e3f-bbde-cb4fc13562c1">Who is the <defterm id="sec.48-def.assessmentmanager" guid="_68e7224b-394f-405d-b1aa-2b354923e07e" type="definition">assessment manager</defterm></heading><subclause id="sec.48-ssec.1" guid="_39d77d13-27b1-44c7-8100-7e0bfaa0226a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The <defterm id="sec.48-def.assessmentmanager-oc.2" guid="_2dd89ccd-f5ca-4b22-84ae-04821082144d" type="definition">assessment manager</defterm> is the person responsible for either or both of the following—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.48-ssec.1-para1.a" guid="_39f70380-9959-44f3-a98f-50adeb0794ae" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">administering a properly made development application;</txt></block></li><li id="sec.48-ssec.1-para1.b" guid="_0dc4fde2-f4d3-4c1c-b637-63cdbec43263" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">assessing and deciding part or all of a properly made development application.</txt></block></li></list></block></subclause><subclause id="sec.48-ssec.2" guid="_0125dfdb-2756-4c6e-87a3-08d7f52881f1" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">Generally, a regulation prescribes who is the assessment manager for each type of development application.</txt></block></subclause><subclause id="sec.48-ssec.3" guid="_ed9294f3-1ac5-4229-b024-74633deb4f81" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">However, if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.48-ssec.3-para1.a" guid="_ae01cbbb-b0f5-4cd0-8d83-f9a33042ba16" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a regulation prescribes a local government or the chief executive (each <defterm id="sec.48-ssec.3-def.theentity" guid="_ccd958f2-6f08-4a25-9b69-d2ad2d826e91" type="definition">the entity</defterm>) to be the assessment manager for a development application in relation to development that requires code assessment; and</txt></block></li><li id="sec.48-ssec.3-para1.b" guid="_bcbb20bc-f7ed-4b26-b37f-f9938863875f" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the entity keeps a list of persons who are appropriately qualified to be an assessment manager in relation to a particular type of that development; and</txt></block></li><li id="sec.48-ssec.3-para1.c" guid="_90648530-6067-41ba-9511-e7ff07650e8d" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the entity has made or amended its code of conduct under the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Public Sector Ethics Act 1994</name></legref> to apply the code of conduct, including provisions about conflicts of interest, to persons on the entity’s list; and</txt></block></li><li id="sec.48-ssec.3-para1.d" guid="_17de1dac-1d8a-46f9-a92b-33307b62f714" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">the entity has entered into an agreement with each person on the entity’s list about the person’s functions as an assessment manager that—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.48-ssec.3-para1.d-para2.i" guid="_3eda12ed-572e-4cc7-8ce5-7782cab71b48" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">requires the person to comply with the code of conduct; and</txt></block></li><li id="sec.48-ssec.3-para1.d-para2.ii" guid="_c61ceebf-2a67-4f82-8e54-8f7a38e7a7c8" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">provides for the entity to remove the person from the entity’s list if the person fails to comply with the code of conduct; and</txt></block></li></list></block></li><li id="sec.48-ssec.3-para1.e" guid="_8d05a5db-91ab-4fc0-ba7a-f96aa3772290" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">a person on the entity’s list enters into an agreement with another person to accept a development application made by the other person in relation to only the development mentioned in paragraph (b);</txt></block></li></list></block><block status="uncommenced"><txt break.before="1">the person on the entity’s list is the <defterm id="sec.48-def.assessmentmanager-oc.3" guid="_cb6bdc09-3f18-4c2e-9597-8f7f6e433768" type="definition">assessment manager</defterm> for the application.</txt></block></subclause><subclause id="sec.48-ssec.4" guid="_05c30df3-8b24-4ec5-8025-2ead75488017" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">As soon as practicable after the person accepts the application, the person must give a copy of the application to the prescribed assessment manager.</txt></block></subclause><subclause id="sec.48-ssec.5" guid="_336b1c95-2fe3-45c4-a56a-8b5227f82429" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">If a person on an entity’s list of persons kept under subsection (3) is removed from the list because the person has not complied with an agreement under that subsection—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.48-ssec.5-para1.a" guid="_932dbc63-5d93-415c-8c7c-3a35cbf31a3d" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the entity immediately becomes the assessment manager, instead of the person, for any development application for which the person was the assessment manager; and</txt></block></li><li id="sec.48-ssec.5-para1.b" guid="_22bf149a-eddc-42d6-b748-7c3663b29ce8" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">no extra fee is payable for the application; and</txt></block></li><li id="sec.48-ssec.5-para1.c" guid="_ebad0432-4b32-44d0-95bf-a3c83d54f5a6" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the development assessment process for the application continues from whichever of the following points in the process is the earlier—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.48-ssec.5-para1.c-para2.i" guid="_151d403f-5707-4c19-998b-0f16156f54c6" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the point the application had reached immediately before the person was replaced as the assessment manager;</txt></block></li><li id="sec.48-ssec.5-para1.c-para2.ii" guid="_e5358b74-175f-407d-a597-34dc5aadd443" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">10 business days before the day on which the assessment manager is required, under the development assessment rules, to decide the application.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.48-ssec.6" guid="_cfad248f-2231-42d6-87be-17690aab3683" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">If the regulation under subsection (2) does not prescribe who is the assessment manager for a particular development application, the Minister may decide who is the assessment manager.</txt></block></subclause><subclause id="sec.48-ssec.7" guid="_b062166a-5e50-461b-8373-0e698e6dd310" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">If the Minister decides who is the assessment manager, the Minister may—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.48-ssec.7-para1.a" guid="_cf694d3c-438d-42d1-9761-c2c18d0107e8" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">decide that a person who could also have been the assessment manager is instead to be a referral agency for the application; and</txt></block></li><li id="sec.48-ssec.7-para1.b" guid="_819ffd4d-1122-4179-9a6e-62cb35bce5c7" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">impose limits on the referral agency’s powers (to the power to only give advice, for example).</txt></block></li></list></block></subclause><subclause id="sec.48-ssec.8" guid="_c1b271f3-ae43-4da8-bb74-57af3e8eca3e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(8)</no><block status="uncommenced"><txt break.before="1">The Minister must give notice of the Minister’s decisions under this section to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.48-ssec.8-para1.a" guid="_27accb60-1a99-4806-ac0f-b6464b5024df" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the applicant; and</txt></block></li><li id="sec.48-ssec.8-para1.b" guid="_79b93499-c7c1-4158-9761-703a1df69d19" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a person that the Minister decides is the assessment manager; and</txt></block></li><li id="sec.48-ssec.8-para1.c" guid="_008a8853-2bcd-4af6-870c-df7222e39d97" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">a person that the Minister decides is a referral agency.</txt></block></li></list></block></subclause><subclause id="sec.48-ssec.9" guid="_1340dd1b-63ca-4cf0-8d6c-5e027eae3955" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(9)</no><block status="uncommenced"><txt break.before="1">For an application for development that is tidal works, a local government may exercise an assessment manager’s functions despite any limits on the local government’s powers under—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.48-ssec.9-para1.a" guid="_6b38395f-5418-4248-ae21-c9d4d3df681f" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the <legref jurisd="QLD" type="act" check="unknown">City of Brisbane Act</legref>, section 11; or</txt></block></li><li id="sec.48-ssec.9-para1.b" guid="_9b5e4692-9e87-4f5e-be84-1c8f23d36811" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the <legref jurisd="QLD" type="act" check="unknown">Local Government Act</legref>, section 9.</txt></block></li></list></block></subclause></clause><clause id="sec.49" guid="_d994a54c-2b11-4d49-b0ea-898fbad6bd79" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>49</no><heading id="sec.49-he" guid="_70557919-451f-48ee-9fc3-516461e9f548">What is a <defterm id="sec.49-def.developmentapproval" guid="_52cebeb7-79ed-4594-b799-ab60699a8db6" type="definition">development approval</defterm>, <defterm id="sec.49-def.preliminaryapproval" guid="_d419a3d0-de74-4e44-bd04-6c033347935c" type="definition">preliminary approval</defterm> or <defterm id="sec.49-def.developmentpermit" guid="_e41573fd-9f8b-47d5-bb90-6110268eb8a6" type="definition">development permit</defterm></heading><subclause id="sec.49-ssec.1" guid="_78845bdc-b245-47f0-a30d-6af58cdb7d60" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A <defterm id="sec.49-def.developmentapproval-oc.2" guid="_ec148bd4-21f5-4ba9-86a0-f99d139f8649" type="definition">development approval</defterm> is—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.49-ssec.1-para1.a" guid="_11752452-9eda-447d-83f0-07232533db3e" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a preliminary approval; or</txt></block></li><li id="sec.49-ssec.1-para1.b" guid="_0ba04ebe-cee4-4974-b550-edd619757edf" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a development permit; or</txt></block></li><li id="sec.49-ssec.1-para1.c" guid="_08d4d63f-bfb8-492d-ac97-edc39b81cd35" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">a combination of a preliminary approval and development permit.</txt></block></li></list></block></subclause><subclause id="sec.49-ssec.2" guid="_7af7fba4-8253-4214-9880-0b56ce8b6a97" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">A <defterm id="sec.49-def.preliminaryapproval-oc.2" guid="_16326ea4-445f-49d1-b1e0-66f69d5117d7" type="definition">preliminary approval</defterm> is the part of a decision notice for a development application that—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.49-ssec.2-para1.a" guid="_190e6865-45d7-482e-aa7d-050541077996" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">approves the development to the extent stated in the decision notice; but</txt></block></li><li id="sec.49-ssec.2-para1.b" guid="_4c8fdc11-8850-4fbf-acff-6123b28b8a16" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">does not authorise the carrying out of assessable development.</txt></block></li></list></block></subclause><subclause id="sec.49-ssec.3" guid="_31629870-60b1-4e6d-a3bd-46cd417d4e7d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">A <defterm id="sec.49-def.developmentpermit-oc.2" guid="_63c4cbfe-aaaf-4e5a-9d1b-79970f6d56ea" type="definition">development permit</defterm> is the part of a decision notice for a development application that authorises the carrying out of the assessable development to the extent stated in the decision notice.</txt></block></subclause><subclause id="sec.49-ssec.4" guid="_8482d03c-a0de-4a70-98f9-7371d423141a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">Subject to section 66(2), a preliminary approval that is still in effect applies instead of a later development permit for the development, to the extent of any inconsistency, unless—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.49-ssec.4-para1.a" guid="_5bc9dff9-0a1a-4167-99e2-cb0e95f31ba6" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the development application for the development permit states the way the development permit is to be inconsistent with the preliminary approval; or</txt></block></li><li id="sec.49-ssec.4-para1.b" guid="_14c78f6f-cc2e-4794-94c4-c5b0e2f874fc" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">after the application for the development permit is made, the applicant and, if the applicant is not the owner of the premises, the owner agree in writing to the inconsistency.</txt></block></li></list></block></subclause><subclause id="sec.49-ssec.5" guid="_329500d2-4b39-49b2-b418-535b544eec30" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">In this Act, a reference to a development approval—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.49-ssec.5-para1.a" guid="_a13c8213-66ae-4bf5-82ed-a84e97f1142c" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">means the development approval as changed from time to time; and</txt></block></li><li id="sec.49-ssec.5-para1.b" guid="_ab3e89d4-997d-4e43-8274-38b19469bc94" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">includes the development conditions imposed on the approval.</txt></block></li></list></block></subclause><subclause id="sec.49-ssec.6" guid="_2de31168-0152-49c1-be1b-f2ae0ebe091f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.49-ssec.6-def.decisionnotice_" guid="_924191e3-3f30-43c8-98cd-a8f840d5b13d" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.49-ssec.6-def.decisionnotice" guid="_4c1b69b4-f78d-4261-a3a3-5ff619549217" type="definition">decision notice</defterm> means—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.49-ssec.6-def.decisionnotice-para1.a" guid="_7d853a59-a32c-4eb0-ac75-5a41d61e905d" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a decision notice under section 63(1); or</txt></block></li><li id="sec.49-ssec.6-def.decisionnotice-para1.b" guid="_7bfda5d6-ab60-418f-ab50-25ac22d572e5" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a decision notice under section 64(6); or </txt></block></li><li id="sec.49-ssec.6-def.decisionnotice-para1.c" guid="_9c3c1c76-1ead-41d3-89bc-7e3e12718cdb" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">a negotiated decision notice under section 76(3)	. </txt></block></li></list></definition></deflist></block></subclause></clause></division><division id="ch.3-pt.2-div.2" guid="_7a3d6afc-68a5-44d2-8e13-dbede1661531" status="uncommenced" affected.by.uncommenced="0"><no>Division 2</no><heading id="ch.3-pt.2-div.2-he" guid="_a0be4a4b-3bb4-468e-8075-b4fb8e204c3b">Making or changing applications</heading><clause id="sec.50" guid="_7ab910e6-67c8-4355-8ab1-0dd7813a0bc1" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>50</no><heading id="sec.50-he" guid="_61e3fd50-fdaa-4c2a-a8fe-607e0a72f15e">Right to make development applications</heading><subclause id="sec.50-ssec.1" guid="_e5e2370a-5d82-454c-a8a4-8bbf1084bbea" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A person may make a development application, including for a preliminary approval.</txt></block></subclause><subclause id="sec.50-ssec.2" guid="_eab6816d-07c3-4cb7-b19d-f1b99ebbaf89" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, a development application may not be made for prohibited development.</txt></block></subclause><subclause id="sec.50-ssec.3" guid="_29a2461c-1c5c-45eb-a894-4afa33029b57" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">A development application for a preliminary approval may also include a variation request.</txt></block></subclause></clause><clause id="sec.51" guid="_10b7b872-9126-458d-a7d6-0b85a0fbfb40" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>51</no><heading id="sec.51-he" guid="_d0455361-3337-48e3-a87b-225704c5de8e">Making development applications</heading><subclause id="sec.51-ssec.1" guid="_d55329b9-6b8e-4898-b21d-33e5abae92c8" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A development application must be—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.51-ssec.1-para1.a" guid="_ae5ec19f-981c-4087-8c10-acbe7674e5bd" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">made in the approved form to the assessment manager; and</txt></block></li><li id="sec.51-ssec.1-para1.b" guid="_c5859daf-90a1-4db9-881f-56a178482bee" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">accompanied by—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.51-ssec.1-para1.b-para2.i" guid="_3a0a82d7-53cb-4ce8-94f5-29039874fd9e" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the documents required under the form to be attached to, or given with, the application; and</txt></block></li><li id="sec.51-ssec.1-para1.b-para2.ii" guid="_ed1f36ae-350f-4f32-b0d4-881264c9fcc3" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the required fee.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.51-ssec.2" guid="_44028caa-709c-4882-bcf0-d9692ee46065" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The application must be accompanied by the written consent of the owner of the premises to the application, to the extent—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.51-ssec.2-para1.a" guid="_6cb1a8c4-04d5-4f75-94c0-7c27a0e1cd28" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the applicant is not the owner; and</txt></block></li><li id="sec.51-ssec.2-para1.b" guid="_1507f316-22c7-4b4d-b240-d4bdafb31608" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the application is for—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.51-ssec.2-para1.b-para2.i" guid="_8e8112f9-3aa1-4d82-a03c-40feab1b3e8d" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a material change of use of premises or reconfiguring a lot; or</txt></block></li><li id="sec.51-ssec.2-para1.b-para2.ii" guid="_3fd722c0-5ecc-47fe-a476-b6025da57779" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">works on premises that are below high-water mark and are outside a canal; and</txt></block></li></list></block></li><li id="sec.51-ssec.2-para1.c" guid="_15578db4-d44d-4d86-81cf-f2ee02b1764b" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the premises are not excluded premises.</txt></block></li></list></block></subclause><subclause id="sec.51-ssec.3" guid="_1a06ed6c-9859-4725-aa86-623db5cdd042" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">If, under the Environmental Protection Act, section 115, a development application is taken to be an application for an environmental authority, the development application must comply with section 125(1)(c) to (3) of that Act as if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.51-ssec.3-para1.a" guid="_bc2e2aa4-c70d-403d-85be-2c08e5f74848" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a reference to the application were a reference to a development application; and</txt></block></li><li id="sec.51-ssec.3-para1.b" guid="_aee93764-1783-4d3a-8b25-e308c624eb3b" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a reference to the applicant were a reference to an applicant for a development application.</txt></block></li></list></block></subclause><subclause id="sec.51-ssec.4" guid="_9c4ec232-c87e-4b24-8415-14f39c3128f2" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">An assessment manager—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.51-ssec.4-para1.a" guid="_3e8e9690-ad95-42d5-81b4-77cc5268a9ab" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">must accept an application that the assessment manager is satisfied complies with subsections (1) to (3); and</txt></block></li><li id="sec.51-ssec.4-para1.b" guid="_868c23c1-88b9-42fe-8328-f9e7514f9c24" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">must not accept an application unless the assessment manager is satisfied the application complies with subsections (2) and (3); and</txt></block></li><li id="sec.51-ssec.4-para1.c" guid="_a59e2437-77df-4a63-aec7-e8d10dd1b56a" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">may accept an application that does not comply with subsection (1)(a) or (b)(i); and</txt></block></li><li id="sec.51-ssec.4-para1.d" guid="_d898ed6d-da23-4cac-bd60-24e8be686a42" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">may accept an application that does not comply with subsection (1)(b)(ii) to the extent the required fee has been waived under section 109(b).</txt></block></li></list></block></subclause><subclause id="sec.51-ssec.5" guid="_76782f1d-db85-4612-aa47-ebc7eaaa0d0f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">An application that complies with subsections (1) to (3), or that the assessment manager accepts under subsection (4)(c) or (d), is a <defterm id="sec.51-def.properlymadeapplication" guid="_2cc73be2-b086-4670-9ba1-65e4f242e7ca" type="definition">properly made application</defterm>.</txt></block></subclause></clause><clause id="sec.52" guid="_e8e1a99d-f417-4dd4-8f4b-6adf054f22f6" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>52</no><heading id="sec.52-he" guid="_48f39a59-8394-42fe-a6f3-d1cb4dd2dada">Changing or withdrawing development applications</heading><subclause id="sec.52-ssec.1" guid="_07b4916f-89bc-436d-92bd-58864d8c0a0d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">An applicant may change or withdraw a development application, before the application is decided, by a notice given to the assessment manager and, for a withdrawn application, any referral agency.</txt></block></subclause><subclause id="sec.52-ssec.2" guid="_4a3b7340-cfb7-495a-96a9-12548bee04e5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.52-ssec.2-para1.a" guid="_525b660f-00ed-4ba5-a120-61149790777c" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if the change is, or includes, a change of applicant, the notice may be given by the person who proposes to become the applicant if the notice is accompanied by the consent of the current applicant; and</txt></block></li><li id="sec.52-ssec.2-para1.b" guid="_ab3a844c-6478-40bd-8624-d64ef62ae7f2" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">section 51(2) applies for making the change as though the change were an application if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.52-ssec.2-para1.b-para2.i" guid="_a44b3573-cb74-45eb-80d7-ee9680c744fe" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the applicant no longer owns the premises or the change is to include premises that the applicant does not own; and</txt></block></li><li id="sec.52-ssec.2-para1.b-para2.ii" guid="_68ea6fd7-5221-4f5a-9a1f-89d127d98031" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">were the application to be remade with the change, section 51(2) would apply to the application; and</txt></block></li></list></block></li><li id="sec.52-ssec.2-para1.c" guid="_28931903-8811-4b1a-bc07-c5a3b1ceb1c2" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the change may not include prohibited development.</txt></block></li></list></block></subclause><subclause id="sec.52-ssec.3" guid="_8071d188-0877-41a5-9e86-7f43d172b447" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">If the change is a minor change, the change does not affect the development assessment process.</txt></block></subclause></clause><clause id="sec.53" guid="_13c8d661-38da-4d06-86f6-1a42505888bc" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>53</no><heading id="sec.53-he" guid="_517f1273-dfe2-47cc-a4e1-d153a553113d">Publicly notifying certain development applications</heading><subclause id="sec.53-ssec.1" guid="_68fc5cb3-930b-4df9-99d8-6da956ba1342" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">An applicant must give notice of a development application if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.53-ssec.1-para1.a" guid="_d6f3da58-d725-440a-9620-98921d3a021f" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">any part of the application requires impact assessment; or</txt></block></li><li id="sec.53-ssec.1-para1.b" guid="_14287fb3-c814-460a-9b6f-fde779b6cb26" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the application includes a variation request.</txt></block></li></list></block></subclause><subclause id="sec.53-ssec.2" guid="_8a658c2f-7c33-4368-aa98-08a8ea4c0e9c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The notice must be given in the way or ways stated in the development assessment rules.</txt></block></subclause><subclause id="sec.53-ssec.3" guid="_a5d43b69-fd20-456b-bef5-9b569cf63006" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">However, the assessment manager may assess and decide a development application even if some of the requirements of the development assessment rules about the notice have not been complied with, if the assessment manager considers any noncompliance has not—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.53-ssec.3-para1.a" guid="_f55b7169-4458-49ce-9412-44981ac1715c" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">adversely affected the public’s awareness of the existence and nature of the application; or</txt></block></li><li id="sec.53-ssec.3-para1.b" guid="_286762a8-617d-4daa-9f75-5fa98ef1dc04" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">restricted the public’s opportunity to make properly made submissions about the application.</txt></block></li></list></block></subclause><subclause id="sec.53-ssec.4" guid="_4a10ac2b-bb6a-422e-bdd5-0e174ce24ba2" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The notice must state that—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.53-ssec.4-para1.a" guid="_aafc65bd-dda9-44ac-8784-436cdd874504" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a person may make a submission about the application to the assessment manager; and</txt></block></li><li id="sec.53-ssec.4-para1.b" guid="_5b474a9f-d58d-4b87-9f6a-b775360566ff" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">any submission must be made by a stated day that is at least—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.53-ssec.4-para1.b-para2.i" guid="_a41aabd6-995e-4e97-9c32-5595fda6aa50" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">for an application that includes a variation request—30 business days after the notice is given; or</txt></block></li><li id="sec.53-ssec.4-para1.b-para2.ii" guid="_8f6271a8-2867-40f9-862e-c54521c1cbe5" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">for an application of a type prescribed by regulation—the period, of more than 15 business days after the notice is given, prescribed for the application; or</txt></block></li><li id="sec.53-ssec.4-para1.b-para2.iii" guid="_03192718-3100-40d0-99bf-3fe5d6564851" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">for any other application—15 business days after the notice is given.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.53-ssec.5" guid="_fe1eb7ed-867b-42b1-8064-20e0e59202e2" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">However, if the development assessment rules require the notice to be given in more than 1 way, the period mentioned in subsection (4)(b) starts on the day after the day when the last notice is given.</txt></block></subclause><subclause id="sec.53-ssec.6" guid="_498fc7e1-701e-4c2e-8144-3d47ab708906" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">Any person, other than the applicant or a referral agency, may make a submission about the application.</txt></block><note id="sec.53-ssec.6-note" guid="_14749d18-f859-4348-8276-d59446c18ab9" type="example"><heading id="sec.53-ssec.6-note-he" guid="_424ae3ce-a2f9-4ab2-a391-e0dc7f49980c">Notes—</heading><block status="uncommenced"><list number.type="manual" unnumbered.indent="0"><li id="sec.53-ssec.6-note-para1.1" guid="_d7e0ec7a-102a-40f9-a011-6bc8a7ee0766" status="uncommenced" provision.type="other"><no>1</no><block status="uncommenced"><txt break.before="1">In order for a submitter to have appeal rights under schedule 1, the submitter's submission must be a properly made submission.</txt></block></li><li id="sec.53-ssec.6-note-para1.2" guid="_c1e03732-094b-4aa0-9f85-19e9f586b941" status="uncommenced" provision.type="other"><no>2</no><block status="uncommenced"><txt break.before="1">An advice agency, in its referral agency’s response, may tell the assessment manager to treat the response as a properly made submission. See schedule 2, definition <defterm id="sec.53-ssec.6-note-def.eligibleadviceagency" guid="_660f1bed-dbfe-4b28-b1e2-c3b3bfaeaf06" type="definition">eligible advice agency</defterm>, paragraph (a).</txt></block></li></list></block></note></subclause><subclause id="sec.53-ssec.7" guid="_351bb136-bbb5-48ad-8a5a-a5428cb5521b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">Submissions made about the application remain effective even if the notice is given again under the development assessment rules.</txt></block></subclause><subclause id="sec.53-ssec.8" guid="_908cc0f7-4de0-41eb-aa43-4e054227f0f0" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(8)</no><block status="uncommenced"><txt break.before="1">If, within 1 year after a development application (the <defterm id="sec.53-def.originalapplication" guid="_16e3b02d-d0aa-417b-8ddd-05a9ec49f111" type="definition">original application</defterm>) lapses or is withdrawn, another development application that is not substantially different from the original application (the <defterm id="sec.53-def.laterapplication" guid="_a5aaea0f-976b-4c6a-aac3-cb33b7cc63be" type="definition">later application</defterm>) is made, any properly made submission for the original application is taken to be a properly made submission for the later application.</txt></block></subclause><subclause id="sec.53-ssec.9" guid="_26a841f7-9a12-46bf-a0da-de420941477c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(9)</no><block status="uncommenced"><txt break.before="1">This section applies even if a referral agency has directed refusal of all or part of the development application.</txt></block></subclause><subclause id="sec.53-ssec.10" guid="_a4650120-0681-41e8-ba4f-8878ac81c6df" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(10)</no><block status="uncommenced"><txt break.before="1">The assessment manager may, at the applicant’s request, give the notice for the applicant, for a fee of no more than the reasonable costs of doing so.</txt></block></subclause><subclause id="sec.53-ssec.11" guid="_b793c30c-212a-4e3e-9515-a4be09e6d286" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(11)</no><block status="uncommenced"><txt break.before="1">However, subsection (1)(b) does not apply if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.53-ssec.11-para1.a" guid="_fcfba4dd-be16-4a0f-89e9-031ddbe1efbc" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a variation approval has been given for the premises; and</txt></block></li><li id="sec.53-ssec.11-para1.b" guid="_148a8546-e734-4516-bd80-ba4da026d3f4" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the variation request does not seek to change the category of development or category of assessment for the development stated in the earlier variation approval or, if the request does, the request seeks to change only 1 or more of the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.53-ssec.11-para1.b-para2.i" guid="_cfe3bdd2-cbb6-4d5c-be16-66ef9873d6e1" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">accepted development to assessable development;</txt></block></li><li id="sec.53-ssec.11-para1.b-para2.ii" guid="_b370c170-4d63-4d2d-b8e7-09b6381642a4" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">assessable development requiring code assessment to accepted development, if the accepted development is substantially consistent with the assessment benchmarks for the development under the earlier variation approval;</txt></block></li><li id="sec.53-ssec.11-para1.b-para2.iii" guid="_ab8e6799-859d-4709-8a88-df7342bbbef8" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">assessable development requiring code assessment to assessable development requiring impact assessment; and</txt></block></li></list></block></li><li id="sec.53-ssec.11-para1.c" guid="_452d17d7-3a2f-42d6-856f-7174d938ec8a" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">for a variation request that proposes assessment benchmarks—the proposed assessment benchmarks are substantially consistent with assessment benchmarks in the earlier variation approval.</txt></block></li></list></block></subclause><subclause id="sec.53-ssec.12" guid="_56261d7c-d3cf-4a66-bff6-83ae12cb8772" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(12)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.53-ssec.12-def.businessday_" guid="_32d51839-81cc-48ae-8765-46c672fec29d" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.53-ssec.12-def.businessday" guid="_e61dcfa8-aa83-4c75-9f49-79b0be57d502" type="definition">business day</defterm> does not include a day between 20 December of a year and 5 January of the next year.</txt></definition></deflist></block></subclause></clause></division></part><part id="ch.3-pt.3" guid="_11293c1e-1dad-402e-bbc9-6ff43c1929ff" status="uncommenced" affected.by.uncommenced="0"><no>Part 3</no><heading id="ch.3-pt.3-he" guid="_da452733-42f5-4938-9d3d-28cd1bdfbcc8">Assessing and deciding development applications</heading><division id="ch.3-pt.3-div.1" guid="_97600a05-cea6-4c28-8746-c0a90b3b3c7f" status="uncommenced" affected.by.uncommenced="0"><no>Division 1</no><heading id="ch.3-pt.3-div.1-he" guid="_d1601bb7-9cc1-4a70-a22f-e235aad4036d">Referral agency’s assessment</heading><clause id="sec.54" guid="_97eb4ad1-2eea-4647-8450-0f73481c0b5b" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>54</no><heading id="sec.54-he" guid="_8f19ef4f-5b72-45bf-a1e1-38ff6f17f9a7">Copy of application to referral agency</heading><subclause id="sec.54-ssec.1" guid="_c64b4509-c9fa-41d0-ae88-2c88517c938c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">An applicant for a development application must, within the period required under the development assessment rules, give a copy of the application and, subject to section 109(b), the required fee, to each referral agency.</txt></block></subclause><subclause id="sec.54-ssec.2" guid="_28bd6c99-60ca-48ad-ad6d-436bfa6687f7" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">A <defterm id="sec.54-def.referralagency" guid="_2f8ee769-72b3-4261-8b99-fe7354d3c33d" type="definition">referral agency</defterm>, for a development application, is—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.54-ssec.2-para1.a" guid="_3ffd5b19-9a55-4647-bc72-402eaa567e08" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the person prescribed by regulation as a referral agency for applications of that type; or</txt></block></li><li id="sec.54-ssec.2-para1.b" guid="_7c37273a-d9b4-4c5b-9b0e-1d3e2b7f962d" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if that person’s functions have been devolved or delegated to another person—the other person; or</txt></block></li><li id="sec.54-ssec.2-para1.c" guid="_efd26f4c-0c56-4353-ba44-b4e56f507326" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">if the Minister has decided that a person is a referral agency under section 48(7)—that person.</txt></block></li></list></block></subclause><subclause id="sec.54-ssec.3" guid="_2eabf688-b581-4ac6-8bb2-538eb4999d32" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">However, if a person is the assessment manager for a development application, and would be a referral agency for the application because of subsection (2)—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.54-ssec.3-para1.a" guid="_8ba578a7-9a14-4644-9df7-c254fedda5f2" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">	the person is not a referral agency for the application, but the person’s functions and powers as assessment manager include those the person would have had as a referral agency; and</txt></block></li><li id="sec.54-ssec.3-para1.b" guid="_73de031b-2503-422a-b0e4-83887a50eff2" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the person’s fee for the development application includes the fee under subsection (1).</txt></block></li></list></block></subclause><subclause id="sec.54-ssec.4" guid="_e6478afe-3ec1-495f-b663-0e54a79a6d95" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">Despite subsection (1), the applicant need not give a copy of the application to a referral agency if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.54-ssec.4-para1.a" guid="_3a3c0d6c-50cc-4d83-aeab-9dae33dfb0a6" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the applicant gave the assessment manager the referral agency’s response stated in section 57(3) with the application; and</txt></block></li><li id="sec.54-ssec.4-para1.b" guid="_1e285b49-da0c-4da9-8f3e-cec7f40dc930" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the referral agency’s response states that—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.54-ssec.4-para1.b-para2.i" guid="_2bde8143-e3dc-4c51-9905-d747716f3826" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the referral agency does not require the applicant to give a copy to the agency; or</txt></block></li><li id="sec.54-ssec.4-para1.b-para2.ii" guid="_b471f04e-1695-4628-a4cd-b7ec2c28cd31" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the referral agency does not require the applicant to give a copy to the agency if stated conditions, including a time limit within which the application must be made, are satisfied; and</txt></block></li></list></block></li><li id="sec.54-ssec.4-para1.c" guid="_6f5a958c-ffe1-41dd-963e-fc78b979469e" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">any conditions stated in paragraph (b)(ii) are satisfied.</txt></block></li></list></block></subclause><subclause id="sec.54-ssec.5" guid="_9833a91f-9c58-4545-bb3f-ee179d4031dd" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The assessment manager may, if asked by the applicant, give a copy of the application to a referral agency for the applicant, for a fee of no more than the reasonable costs of doing so.</txt></block></subclause></clause><clause id="sec.55" guid="_a86eb943-b7d6-43aa-8f4f-92149a7090a7" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>55</no><heading id="sec.55-he" guid="_acd9f7ce-62b0-46e2-bb6f-8d7cc5e80e91">Referral agency’s assessment</heading><subclause id="sec.55-ssec.1" guid="_4f70a1a5-3381-4da6-8852-75eecc3734d6" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A referral agency decided by the Minister under section 48(7) must assess a development application as required under section 45, as if the agency were the assessment manager.</txt></block></subclause><subclause id="sec.55-ssec.2" guid="_48d488c2-3dab-4ca4-9614-dfba8c328001" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">For any other referral agency, a regulation may prescribe the matters the referral agency—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.55-ssec.2-para1.a" guid="_9e06a637-2558-4a55-b9ed-6940c2e267b2" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">may, must, or must only assess a development application against; and</txt></block></li><li id="sec.55-ssec.2-para1.b" guid="_6185c884-5e2d-4b5d-913c-6cf9d17eff49" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">may, must, or must only have regard to for the assessment.</txt></block></li></list></block><note id="sec.55-ssec.2-note" guid="_5e0cab69-afee-4fe2-b1aa-5905c79222de" type="example"><heading id="sec.55-ssec.2-note-he" guid="_9e7e7f06-782a-40ef-92a8-c60f70bdec61">Note—</heading><block status="uncommenced"><txt break.before="1">See section 277 for the matters the chief executive, acting as a referral agency, must have regard to in relation to a State heritage place.</txt></block></note></subclause><subclause id="sec.55-ssec.3" guid="_91272728-d3b5-4746-89b5-a5d8b6227fe1" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">If the regulation refers to a statutory instrument or another document applied, adopted or incorporated (with or without changes), the reference is a reference to the instrument or other document as in effect when the application was properly made.</txt></block></subclause><subclause id="sec.55-ssec.4" guid="_9ade5129-c8d3-41c3-b46c-7e8a8e7e3e7f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">However, the referral agency may give the weight that the referral agency considers is appropriate, in the circumstances, to any amendment or replacement of the instrument or other document that came into effect after the application was properly made.</txt></block></subclause></clause><clause id="sec.56" guid="_bc00be97-ea5c-4baf-a451-2843bc4c95ac" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>56</no><heading id="sec.56-he" guid="_d9ee4e1c-9789-4921-a0a4-b9182885aacb">Referral agency’s response</heading><subclause id="sec.56-ssec.1" guid="_644bf634-0cf1-40fe-832e-037e341c1798" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">After assessing the development application, the referral agency must decide—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.56-ssec.1-para1.a" guid="_d0e6c915-5ba2-492e-b0b4-0390aeded79d" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">to tell the assessment manager that the agency has no requirements for the application; or</txt></block></li><li id="sec.56-ssec.1-para1.b" guid="_0a36ba64-d6b2-4c6f-8785-58281a1dc72e" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">to direct the assessment manager to do any or all of the following—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.56-ssec.1-para1.b-para2.i" guid="_c74beb5c-a440-4168-8579-d7714727707b" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">to give any development approval subject to stated development conditions;</txt></block></li><li id="sec.56-ssec.1-para1.b-para2.ii" guid="_c386ff67-0ade-41f6-8596-8a5abc411adc" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">to give any development approval for only a stated part of the application;</txt></block></li><li id="sec.56-ssec.1-para1.b-para2.iii" guid="_5fac2c09-a8af-4d9a-9b0f-35174a25b563" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">to give any development approval only as a preliminary approval;</txt></block></li><li id="sec.56-ssec.1-para1.b-para2.iv" guid="_c381b377-3c97-4bf2-988a-6e73428b0973" status="uncommenced" provision.type="other"><no>(iv)</no><block status="uncommenced"><txt break.before="1">to impose a stated currency period for a development approval given; or</txt></block></li></list></block></li><li id="sec.56-ssec.1-para1.c" guid="_4e3724f1-94ca-441a-9d02-a203380d1404" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">to direct the assessment manager to refuse the application for stated reasons.</txt></block></li></list></block></subclause><subclause id="sec.56-ssec.2" guid="_5f4bb48d-c123-406b-b6c7-4e876668756c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, to the extent the application is a variation request, the referral agency must, instead of a decision under subsection (1), decide—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.56-ssec.2-para1.a" guid="_1a7cb5e2-8510-42ef-baaa-a8fa8003c7ab" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">to tell the assessment manager that the agency has no requirements for the variation request; or</txt></block></li><li id="sec.56-ssec.2-para1.b" guid="_5dbf4ab9-6424-433f-a2b6-2e5d46456e83" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">to direct the assessment manager to do any or all of the following—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.56-ssec.2-para1.b-para2.i" guid="_baef84a0-590e-46b0-aa2e-a57f3f9a9b00" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">to approve only some of the variations sought;</txt></block></li><li id="sec.56-ssec.2-para1.b-para2.ii" guid="_d6627fe8-cde6-4b3b-9945-7696f8d72ade" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">subject to section 61(3)—to approve different variations from those sought; or</txt></block></li></list></block></li><li id="sec.56-ssec.2-para1.c" guid="_e726bc86-326f-4b07-b4f7-0fcd2001aaa9" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">to direct the assessment manager to refuse the variation request.</txt></block></li></list></block></subclause><subclause id="sec.56-ssec.3" guid="_745409e7-8be8-47a8-9f63-051cc40868cf" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The referral agency may give advice about the application to the assessment manager.</txt></block></subclause><subclause id="sec.56-ssec.4" guid="_4a135fb2-3451-4199-b860-a2a6c5f59e89" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The referral agency must give a notice (a <defterm id="sec.56-def.referralagencysresponse" guid="_b6b393a8-4b13-41c3-8698-b0cdff2a5a4d" type="definition">referral agency’s response</defterm>) about the referral agency’s decision to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.56-ssec.4-para1.a" guid="_eeb198c7-40de-475f-b3ef-1039ed08b715" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the applicant; and</txt></block></li><li id="sec.56-ssec.4-para1.b" guid="_f7dd44a5-01d9-44e2-8a23-a967cb5fc100" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the assessment manager.</txt></block></li></list></block></subclause><subclause id="sec.56-ssec.5" guid="_2bdaaf37-833e-42d8-8a5b-765aae5b2e90" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">A regulation may limit the powers of a referral agency (to the power to only give advice, for example).</txt></block></subclause><subclause id="sec.56-ssec.6" guid="_c7ec367a-fb35-44bd-818c-c358438d74a9" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">If—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.56-ssec.6-para1.a" guid="_801b8205-5bf9-46c2-a61d-e3341b217722" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the referral agency is—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.56-ssec.6-para1.a-para2.i" guid="_4ee9a3eb-b7ea-4486-8cb4-5241b84ef86e" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the chief executive; or</txt></block></li><li id="sec.56-ssec.6-para1.a-para2.ii" guid="_c876a7b0-6b6f-41df-aa09-45d611c0e0e7" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">an entity prescribed by regulation; and</txt></block></li></list></block></li><li id="sec.56-ssec.6-para1.b" guid="_55e68eaa-a080-48c6-bbc8-d9bb9281d743" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">to the extent the referral agency’s assessment involves development other than development prescribed by regulation;</txt></block></li></list></block><block status="uncommenced"><txt break.before="1">the referral agency must publish a notice about the referral agency’s decision on the referral agency’s website.</txt></block></subclause><subclause id="sec.56-ssec.7" guid="_6f7def70-a878-4e84-8db5-e1c559307234" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">The notice must state—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.56-ssec.7-para1.a" guid="_72e254a6-e55c-400b-bba3-7d3b3895c22f" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a description of the development to which the referral agency’s assessment relates; and</txt></block></li><li id="sec.56-ssec.7-para1.b" guid="_30f7a074-99b1-42bc-a15f-86fa51c29829" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a description of the matters under section 55(2) that the referral agency assessed the development against, and had regard to; and</txt></block></li><li id="sec.56-ssec.7-para1.c" guid="_c419aace-71b4-47a4-a1e2-840b7e5df801" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the reasons for the referral agency’s decision; and</txt></block></li><li id="sec.56-ssec.7-para1.d" guid="_932b9e8a-16ec-4339-825e-418d7cf0e41c" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">any matter prescribed by regulation.</txt></block></li></list></block></subclause></clause><clause id="sec.57" guid="_21fbcd2c-bc33-4047-9773-392e8a2dae05" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>57</no><heading id="sec.57-he" guid="_5cff647d-d2dc-429f-8dbd-fcb1d7f80c06">Response before application</heading><subclause id="sec.57-ssec.1" guid="_b3b7507b-6132-4d3e-a9f4-b0103d3af2c8" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">Sections 55 and 56 apply to the extent a response is given before a proposed development application is made, by a person who would, if the application were made, be a referral agency.</txt></block></subclause><subclause id="sec.57-ssec.2" guid="_7de315cf-7da4-4521-a874-0b90bb157d46" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, a reference in section 55 to when the application was properly made is a reference to the day the proposed applicant first gave the person documents in relation to the proposed development application.</txt></block></subclause><subclause id="sec.57-ssec.3" guid="_0e653d55-8de5-44eb-b20e-f5e6d2ae935c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">If the application—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.57-ssec.3-para1.a" guid="_5d09f2bb-9fbc-4840-9057-3580e558e948" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">is the same or is not substantially different from the proposed application; and</txt></block></li><li id="sec.57-ssec.3-para1.b" guid="_1f6e4c5c-d3f3-490c-82c5-2d6c9fb9a627" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">is made within the time, if any, stated in the response;</txt></block></li></list></block><block status="uncommenced"><txt break.before="1">the response is, or is part of, the person’s referral agency’s response for the application.</txt></block></subclause><subclause id="sec.57-ssec.4" guid="_d77a2801-0910-4630-8201-63ea0c7dd2d8" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The proposed applicant must, if asked, and subject to section 109(b), pay the person the required fee for the referral, even if there is no application.</txt></block></subclause><subclause id="sec.57-ssec.5" guid="_d980d2c0-76d5-4753-94e3-f3876aeea8e4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">A fee under section 54(1) for the part of the application relating to a response under this section does not have to be paid again for the application.</txt></block></subclause></clause><clause id="sec.58" guid="_82df1ed7-abc0-46bc-8812-c826c7791b04" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>58</no><heading id="sec.58-he" guid="_2a5e62f6-3197-4d9a-9a6d-6d3c2ea57b0d">Effect of no response</heading><subclause id="sec.58-ssec.1" guid="_cbdc9b22-78dc-4f7f-b111-5ed9eedde8b0" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">If a referral agency does not comply with section 56(4) before the end of the period stated in the development assessment rules for complying with that section (the <defterm id="sec.58-def.statedperiod" guid="_a88592b6-6315-417d-9e65-845a1a5cf35c" type="definition">stated period</defterm>), the agency is taken to have given a response that the agency has no requirements for, or advice about, the application.</txt></block></subclause><subclause id="sec.58-ssec.2" guid="_3dab2fa6-6730-4cc9-92c1-53918069b3bb" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, subsection (1) is subject to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.58-ssec.2-para1.a" guid="_7c7edd5f-822f-4d62-bba9-512d40621c4c" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">any other provision of the development assessment rules, to the extent the other provision affects when the stated period would otherwise end; and</txt><note id="sec.58-ssec.2-para1.a-note" guid="_3e4f228e-cb3e-4501-8ed4-58b05b2e4bee" type="example"><heading id="sec.58-ssec.2-para1.a-note-he" guid="_202f8047-41e2-4d72-89a2-ec9734c056eb">Examples of what other provisions may provide for—</heading><block status="uncommenced"><list number.type="bull" unnumbered.indent="0"><li id="sec.58-ssec.2-para1.a-note-para2" guid="_53314fd7-d15c-46a4-80fc-fcc93ca56ed0" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">extending the period for giving a referral agency’s response</txt></block></li><li id="sec.58-ssec.2-para1.a-note-para2-oc.2" guid="_3fcdfc87-4079-48aa-8168-c1ada66f35a9" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">giving a late referral agency’s response</txt></block></li><li id="sec.58-ssec.2-para1.a-note-para2-oc.3" guid="_d008c1e9-239e-44dd-b999-c4200916bac9" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">changing a referral agency’s response before the application is decided</txt></block></li><li id="sec.58-ssec.2-para1.a-note-para2-oc.4" guid="_a71546b1-1873-4524-bd5e-aec8ca68fc50" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">reviving a development application after a contravention of the development assessment rules</txt></block></li></list></block></note></block></li><li id="sec.58-ssec.2-para1.b" guid="_d4f03d2c-3069-4cf7-96ca-3db8b79f8cc9" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">section 99; and</txt></block></li><li id="sec.58-ssec.2-para1.c" guid="_2c899738-e554-4464-990c-65814fc30920" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">another effect of not giving a referral agency’s response prescribed under a regulation for a matter.</txt></block></li></list></block></subclause></clause></division><division id="ch.3-pt.3-div.2" guid="_988c7ab7-84ab-49cf-955a-45c2dc85e9aa" status="uncommenced" affected.by.uncommenced="0" numbering.style="manual"><no>Division 2</no><heading id="ch.3-pt.3-div.2-he" guid="_6e2ddebb-b951-4065-85ea-04e1bfb99ccc">Assessment manager’s decision</heading><clause id="sec.59" guid="_c05e78d1-f20d-4467-8e9a-6870a6d98005" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>59</no><heading id="sec.59-he" guid="_7de9372d-95bb-4866-9483-0b69281b7563">What this division is about</heading><subclause id="sec.59-ssec.1" guid="_969439c8-f607-4671-aa05-157da0201e4e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This division is about deciding properly made development applications, including variation requests.</txt></block></subclause><subclause id="sec.59-ssec.2" guid="_a3c28a3b-010c-4504-bcb2-7e0e29445dee" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">An assessment manager must follow the development assessment process for the application even if a referral agency’s response directs the assessment manager to refuse the application.</txt></block></subclause><subclause id="sec.59-ssec.3" guid="_be54fe14-d0b8-478b-8764-85db0b387ddf" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">Subject to section 62, the assessment manager’s decision must be based on the assessment of the development carried out by the assessment manager.</txt></block></subclause></clause><clause id="sec.60" guid="_e365791b-1e64-499d-bbd2-910a03ccfd50" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>60</no><heading id="sec.60-he" guid="_98991d28-99d4-4bec-94a3-51f971db5d37">Deciding development applications</heading><subclause id="sec.60-ssec.1" guid="_91c7706e-726e-44d8-849e-c8c2d760e7a4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to a properly made development application, other than a part of a development application that is a variation request.</txt></block></subclause><subclause id="sec.60-ssec.2" guid="_ac3fcb99-8697-4750-b177-abd72076e606" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">To the extent the application involves development that requires code assessment, and subject to section 62, the assessment manager, after carrying out the assessment—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.60-ssec.2-para1.a" guid="_d5d1d3d9-28f0-4d2e-9f12-6a68d5e8c027" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">must decide to approve the application to the extent the development complies with all of the assessment benchmarks for the development; and</txt></block></li><li id="sec.60-ssec.2-para1.b" guid="_70df10c1-a67a-4827-928e-a1d047ef104b" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">may decide to approve the application even if the development does not comply with some of the assessment benchmarks; and</txt><note id="sec.60-ssec.2-para1.b-note" guid="_d93ae5db-ba92-4848-aac9-2e4d61df9f76" type="example"><heading id="sec.60-ssec.2-para1.b-note-he" guid="_eba8760d-ee98-4745-bf95-cba9f2c33ff9">Examples—</heading><block status="uncommenced"><list number.type="default" unnumbered.indent="0"><li id="sec.60-ssec.2-para1.b-note-para2.1" guid="_250f74d2-4d10-431f-a7a3-bf6254bbcb87" status="uncommenced" provision.type="other"><no>1</no><block status="uncommenced"><txt break.before="1">An assessment manager may approve an application for development that does not comply with some of the benchmarks if the decision resolves a conflict between the benchmarks.</txt></block></li><li id="sec.60-ssec.2-para1.b-note-para2.2" guid="_b64b2316-e927-4fb4-b832-8e343ab64b4a" status="uncommenced" provision.type="other"><no>2</no><block status="uncommenced"><txt break.before="1">An assessment manager may approve an application for development that does not comply with some of the benchmarks if the decision resolves a conflict between the benchmarks and a referral agency’s response.</txt></block></li></list></block></note></block></li><li id="sec.60-ssec.2-para1.c" guid="_316968dd-a4b0-4e33-8112-c9ad177437f6" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">may impose development conditions on an approval; and</txt></block></li><li id="sec.60-ssec.2-para1.d" guid="_c6a841fc-c6e1-49da-8d68-465e735d0fe5" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">may, to the extent the development does not comply with some or all the assessment benchmarks, decide to refuse the application only if compliance can not be achieved by imposing development conditions.</txt><note id="sec.60-ssec.2-para1.d-note" guid="_592912de-cbe3-4395-9c2c-11e3dd189694" type="example"><heading id="sec.60-ssec.2-para1.d-note-he" guid="_7e889073-a35e-46be-80a3-a27618cadc34">Example of a development condition for paragraph (d)—</heading><block status="uncommenced"><txt break.before="1">a development condition that affects the way the development is carried out, or the management of uses or works that are the natural and ordinary consequence of the development, but does not have the effect of changing the type of development applied for</txt></block></note></block></li></list></block></subclause><subclause id="sec.60-ssec.3" guid="_9e64557c-03a9-4d21-87cf-89c774607320" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">To the extent the application involves development that requires impact assessment, and subject to section 62, the assessment manager, after carrying out the assessment, must decide—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.60-ssec.3-para1.a" guid="_c86531c4-c63e-4611-a0c8-df262b5bb2d5" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">to approve all or part of the application; or</txt></block></li><li id="sec.60-ssec.3-para1.b" guid="_2ec2db56-bc0c-42cd-b8e4-98da64eff5d5" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">to approve all or part of the application, but impose development conditions on the approval; or</txt></block></li><li id="sec.60-ssec.3-para1.c" guid="_af9cfd25-0340-4031-a566-196634f8c890" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">to refuse the application.</txt></block></li></list></block></subclause><subclause id="sec.60-ssec.4" guid="_cf039247-4012-4f34-a619-640004fc1dad" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The assessment manager must approve any part of the application for which, were that part of the application the subject of a separate development application, there would be a different assessment manager—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.60-ssec.4-para1.a" guid="_1d2caef9-623f-4324-88b6-210e03b6e10b" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">other than to the extent a referral agency for the development application directs the refusal of the part under section 56(1)(c); and</txt></block></li><li id="sec.60-ssec.4-para1.b" guid="_a4b74da1-d136-4e95-a749-de6f13e36293" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">subject to any requirements of the referral agency under 56(1)(b).</txt></block></li></list></block></subclause><subclause id="sec.60-ssec.5" guid="_cf71782a-087f-47d2-8a78-a69a648db06a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The assessment manager may give a preliminary approval for all or part of the development application, even though the development application sought a development permit.</txt></block></subclause><subclause id="sec.60-ssec.6" guid="_60a7816b-8c2d-4c9e-bd8f-bc6df082a958" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">If an assessment manager approves only part of a development application, the rest is taken to be refused.</txt></block></subclause></clause><clause id="sec.61" guid="_3aadbb27-1693-43c8-9d80-aecdcde8af78" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>61</no><heading id="sec.61-he" guid="_3a8fc3e1-b09c-4fff-912c-a7fd8bd053a5">Assessing and deciding variation requests</heading><subclause id="sec.61-ssec.1" guid="_c19b308f-e4a4-4a87-9166-fbcaf2bd2db3" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to a part of a properly made development application that is a variation request.</txt></block></subclause><subclause id="sec.61-ssec.2" guid="_7703f5f7-037e-47b0-844e-7734fdfdebdd" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">When assessing the variation request, the assessment manager must consider—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.61-ssec.2-para1.a" guid="_a0021c1b-85ce-44e3-b0f8-16d5c301a58b" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the result of the assessment of that part of the development application that is not the variation request; and</txt></block></li><li id="sec.61-ssec.2-para1.b" guid="_f04ef4b8-d065-4d3d-a895-89562ae31d2d" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the consistency of the variations sought with the rest of the local planning instrument that is sought to be varied; and</txt></block></li><li id="sec.61-ssec.2-para1.c" guid="_1d35bcb1-dce2-4056-a331-623b826e0382" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the effect the variations would have on submission rights for later development applications, particularly considering the amount and detail of information included in, attached to, or given with the application and available to submitters; and</txt></block></li><li id="sec.61-ssec.2-para1.d" guid="_e10c6d15-76d4-416a-a127-39918104b19c" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">any other matter prescribed by regulation.</txt></block></li></list></block></subclause><subclause id="sec.61-ssec.3" guid="_72d53453-a3bd-40f1-91a9-ff9f9e3a4dce" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The assessment manager must decide—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.61-ssec.3-para1.a" guid="_c02f5566-d8b1-43d2-b14e-c1ccf4bcc2df" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">to approve—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.61-ssec.3-para1.a-para2.i" guid="_468f7911-9081-428b-a2aa-e5de773b83f8" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">all or some of the variations sought; or</txt></block></li><li id="sec.61-ssec.3-para1.a-para2.ii" guid="_884220f4-7ac8-4e88-a537-964e8d326f8b" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">different variations from those sought; or</txt></block></li></list></block></li><li id="sec.61-ssec.3-para1.b" guid="_d2c9bb9d-f715-4508-95f0-d0f1e24a2b83" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">to refuse the variations sought.</txt></block></li></list><note id="sec.61-ssec.3-note" guid="_4b255b92-9d2d-433f-8a01-7821d5b9f9df" type="example"><heading id="sec.61-ssec.3-note-he" guid="_f8138929-e22c-4891-8e83-eca5e004eb9a">Note—</heading><block status="uncommenced"><txt break.before="1">The part of a variation approval that approves variations is a local categorising instrument. Section 43(7) states limits on the variation approval as a categorising instrument.</txt></block></note></block></subclause></clause><clause id="sec.62" guid="_e99b2b22-c307-47a4-a260-c607c0c21e80" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>62</no><heading id="sec.62-he" guid="_4dd79162-b2e2-4f1b-a9ee-07fcc44d5563">Complying with referral agency’s responses</heading><block status="uncommenced"><txt break.before="1">Other than to the extent a referral agency’s response provides advice, an assessment manager’s decision must—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.62-para1.a" guid="_d4caf23f-4fd2-4b18-9da9-6520b4ad964c" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">comply with all referral agency’s responses; and</txt></block></li><li id="sec.62-para1.b" guid="_d22cac1b-f4b4-4608-8250-7b2cf09b486e" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if a referral agency’s response requires conditions to be imposed on a development approval—include the conditions exactly as stated in the response.</txt></block></li></list></block></clause><clause id="sec.63" guid="_6bd12773-9650-4839-805d-70a553b43c1f" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>63</no><heading id="sec.63-he" guid="_886583cc-62fb-4270-816f-f477e8acd496">Notice of decision</heading><subclause id="sec.63-ssec.1" guid="_ac18c90b-b92b-41dd-b29c-4c7dfcc8c68d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The assessment manager must give a decision notice about the assessment manager’s decision to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.63-ssec.1-para1.a" guid="_ee923fea-4fdf-4daf-b57e-437b821f2981" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the applicant; and</txt></block></li><li id="sec.63-ssec.1-para1.b" guid="_763ab434-6f6e-4dbd-902d-c568b5adac7e" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">each referral agency; and</txt></block></li><li id="sec.63-ssec.1-para1.c" guid="_d0e3f474-460a-4c75-a51e-d1b523c81122" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">if the development is in a local government area and the assessment manager is not the local government—the local government; and</txt></block></li><li id="sec.63-ssec.1-para1.d" guid="_17aca1e1-6a6d-4b47-b191-2f71e8bff586" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">if the assessment manager is a chosen assessment manager—the prescribed assessment manager; and</txt></block></li><li id="sec.63-ssec.1-para1.e" guid="_ef1fde29-ebe3-42ee-b829-be4fdf4b693e" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">if a negotiated decision notice is not given in relation to the decision—each principal submitter; and</txt></block></li><li id="sec.63-ssec.1-para1.f" guid="_462105af-a601-4dff-b29c-e7f39aa5a197" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">any other person prescribed by regulation.</txt></block></li></list><note id="sec.63-ssec.1-note" guid="_c5ca6468-3694-4499-9386-41a907ab84ac" type="example"><heading id="sec.63-ssec.1-note-he" guid="_a550abf8-c3fa-45c6-96f6-0e441f77c4e9">Note—</heading><block status="uncommenced"><txt break.before="1">See the development assessment rules for when the notice is to be given.</txt></block></note></block></subclause><subclause id="sec.63-ssec.2" guid="_3ea26942-e5d0-47cd-8e06-adea5a1cdc37" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The notice must be in the approved form and state—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.63-ssec.2-para1.a" guid="_4f7de76a-b354-4925-90de-aa0af16d74cb" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">whether the application is approved, approved in part or refused; and</txt></block></li><li id="sec.63-ssec.2-para1.b" guid="_2b273aba-b4e2-4834-8eed-77525c7269ea" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the application is approved in part—the extent to which the application is approved; and</txt></block></li><li id="sec.63-ssec.2-para1.c" guid="_52d2906e-648e-4f3f-a129-c554c181c447" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">if the application is approved or approved in part—whether the approval is a preliminary approval, a development permit, or both; and</txt></block></li><li id="sec.63-ssec.2-para1.d" guid="_6453fee1-adf5-4932-8055-2468029e2590" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">if section 64(5) applies—that the assessment manager is taken to have approved the application under that subsection; and</txt></block></li><li id="sec.63-ssec.2-para1.e" guid="_3daaa742-cd8e-4498-89a9-a3927cac4092" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">if development conditions are imposed—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.63-ssec.2-para1.e-para2.i" guid="_64c3b923-7a4e-4309-8b32-eb413dd93643" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the conditions; and</txt></block></li><li id="sec.63-ssec.2-para1.e-para2.ii" guid="_0ec56a3b-7cd6-409b-aa3f-34fd929202d2" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">for each condition—whether the condition was imposed directly by the assessment manager or required to be imposed under a referral agency’s response; and</txt></block></li><li id="sec.63-ssec.2-para1.e-para2.iii" guid="_91def6e5-2ed1-44d8-a7df-ef12c643bfb4" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">for each condition imposed under a referral agency’s response—the referral agency’s name; and</txt></block></li><li id="sec.63-ssec.2-para1.e-para2.iv" guid="_504669e2-d042-4e4f-b6b6-0bb24ef46298" status="uncommenced" provision.type="other"><no>(iv)</no><block status="uncommenced"><txt break.before="1">for each condition about infrastructure under chapter 4—the provision of this Act under which the condition was imposed; and</txt></block></li></list></block></li><li id="sec.63-ssec.2-para1.f" guid="_a85c570f-2959-421b-88b1-5cdb276cb822" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">if the application is refused—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.63-ssec.2-para1.f-para2.i" guid="_0aaa1ad6-5630-4f27-8ed4-3cc70560dea9" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">whether the assessment manager was directed to refuse the application and, if so, the referral agency directing refusal and whether the refusal was solely because of the direction; and</txt></block></li><li id="sec.63-ssec.2-para1.f-para2.ii" guid="_93331502-cc62-44d1-b417-f1f478840701" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">for a refusal for a reason other than because of a referral agency’s direction—the reasons for the refusal; and</txt></block></li></list></block></li><li id="sec.63-ssec.2-para1.g" guid="_721083cf-4510-45d8-9331-5ff4cea29f58" status="uncommenced" provision.type="other"><no>(g)</no><block status="uncommenced"><txt break.before="1">for a variation approval—the variations; and</txt></block></li><li id="sec.63-ssec.2-para1.h" guid="_9234ffb0-0ef1-406e-b357-6118a7261052" status="uncommenced" provision.type="other"><no>(h)</no><block status="uncommenced"><txt break.before="1">the name, residential or business address, and electronic address of each principal submitter; and</txt></block></li><li id="sec.63-ssec.2-para1.i" guid="_d1eec0b5-4244-4ae9-b10f-7a829bef3e29" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the day the decision was made.</txt></block></li></list></block></subclause><subclause id="sec.63-ssec.3" guid="_eb3efe33-c9c0-4102-b4d9-fe9aaf62be08" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The notice must also state, or be accompanied by, the documents prescribed by regulation.</txt></block></subclause><subclause id="sec.63-ssec.4" guid="_27d9adfd-f0a3-4aff-9d50-267bdc047131" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">If—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.63-ssec.4-para1.a" guid="_f8a3fa7a-884c-4f1f-8aad-0ea55d9db62d" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the assessment manager in relation to a development application is—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.63-ssec.4-para1.a-para2.i" guid="_f45b47a2-a046-460f-a913-b581d0b66bc9" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a local government; or</txt></block></li><li id="sec.63-ssec.4-para1.a-para2.ii" guid="_bc7aaa84-0371-4e8a-8322-ebe4e199c24f" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the chief executive; or</txt></block></li><li id="sec.63-ssec.4-para1.a-para2.iii" guid="_526e32e4-29ca-4d68-a0dd-243d99adca65" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">an entity prescribed by regulation; and</txt></block></li></list></block></li><li id="sec.63-ssec.4-para1.b" guid="_ab3aeeb1-4fa4-4b32-a703-6f1afbb519f4" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the development application involved—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.63-ssec.4-para1.b-para2.i" guid="_db333c50-7954-4edf-8dd6-2ba3559c18ae" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a material change of use; or</txt></block></li><li id="sec.63-ssec.4-para1.b-para2.ii" guid="_f4f1b5b0-c8ab-4062-b26c-417491bd3bd1" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">reconfiguring a lot; or</txt></block></li><li id="sec.63-ssec.4-para1.b-para2.iii" guid="_38636190-4733-40d9-937a-b1b216c1b03e" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">building work, other than to the extent the building work is assessable against the building assessment provisions; or</txt></block></li><li id="sec.63-ssec.4-para1.b-para2.iv" guid="_066703e8-517b-43af-8689-f5551aa168df" status="uncommenced" provision.type="other"><no>(iv)</no><block status="uncommenced"><txt break.before="1">development prescribed by regulation;</txt></block></li></list></block></li></list><txt break.before="1">the assessment manager must publish a notice about the decision on the assessment manager’s website.</txt></block></subclause><subclause id="sec.63-ssec.5" guid="_fae97a78-1d96-42bf-9200-e5280a82e593" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The notice must state—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.63-ssec.5-para1.a" guid="_bbcaa3af-3068-4aff-bcfa-18fb32198548" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a description of the development; and</txt></block></li><li id="sec.63-ssec.5-para1.b" guid="_cb70897b-9daf-4276-a694-94fd889f51d8" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a description of the assessment benchmarks applying for the development; and</txt></block></li><li id="sec.63-ssec.5-para1.c" guid="_b9def469-ed3a-452f-82a0-1e658ce2a59d" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">to the extent the development required impact assessment—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.63-ssec.5-para1.c-para2.i" guid="_834de403-67f6-42a4-9beb-a37a75267680" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">any relevant matters under section 45(5)(b) that the development was assessed against, or to which regard was had, in the assessment; and</txt></block></li><li id="sec.63-ssec.5-para1.c-para2.ii" guid="_583ad538-b46d-4aea-8821-316b9062a81d" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">a description of the matters raised in any submissions; and</txt></block></li><li id="sec.63-ssec.5-para1.c-para2.iii" guid="_34305e07-e366-4e52-a262-2b4a11592a9a" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">how the assessment manager dealt with the matters described under subparagraph (ii) in reaching a decision; and</txt></block></li></list></block></li><li id="sec.63-ssec.5-para1.d" guid="_d666da3d-a9be-49c2-879e-c891957b2703" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">the reasons for the assessment manager’s decision; and</txt></block></li><li id="sec.63-ssec.5-para1.e" guid="_10fea8d2-95d4-48c3-be89-1d0094082d9d" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">if the development application was approved, or approved subject to conditions, and the development did not comply with any of the benchmarks—the reasons why the application was approved despite the development not complying with any of the benchmarks; and</txt></block></li><li id="sec.63-ssec.5-para1.f" guid="_5aab9a38-ae48-4c2e-973e-54966bb196c4" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">any matter prescribed by a regulation.</txt></block></li></list></block></subclause></clause><clause id="sec.64" guid="_96542599-7d41-451b-845e-a65f1fb89e65" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>64</no><heading id="sec.64-he" guid="_24057aa5-49b1-4a13-83fc-39e2a0d76ea6">Deemed approval of applications</heading><subclause id="sec.64-ssec.1" guid="_65052dae-4837-4522-81ba-d3475144ef01" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to a development application if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.64-ssec.1-para1.a" guid="_cdbbdfb0-cec5-45d5-b5b4-7bdf53ab0b07" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the application requires only code assessment; and</txt></block></li><li id="sec.64-ssec.1-para1.b" guid="_d6d1c245-bee9-42b1-82cc-aaecf5d2b09e" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the assessment manager does not decide the application within the period, or extended period, allowed under the development assessment rules.</txt></block></li></list></block></subclause><subclause id="sec.64-ssec.2" guid="_a7428469-25c4-4691-b9ad-6853d8d6a5d0" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, this section does not apply to a development application—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.64-ssec.2-para1.a" guid="_307d0563-0b07-4a74-aeb3-a9e488baee30" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">that includes a variation request; or</txt></block></li><li id="sec.64-ssec.2-para1.b" guid="_4bca13be-110a-4fe5-b079-36853b98f9b2" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if a referral agency directs the assessment manager—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.64-ssec.2-para1.b-para2.i" guid="_d3beaefb-180a-4514-89ac-17556cbbe82b" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">to give any development approval for only a stated part of the application; or</txt></block></li><li id="sec.64-ssec.2-para1.b-para2.ii" guid="_38ea462f-5533-42a0-bc80-6f13b2c6fdc7" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">to refuse the application; or</txt></block></li></list></block></li><li id="sec.64-ssec.2-para1.c" guid="_7630d349-f0c3-4580-aa22-4c6ace9eded7" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">that includes development for which the building assessment provisions are an assessment benchmark; or</txt></block></li><li id="sec.64-ssec.2-para1.d" guid="_bcb93f44-0e21-4070-abf0-030337581341" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">that is subject to a direction under section 95(1)(b), if the stated period for the application under that section has not ended.</txt></block></li></list></block></subclause><subclause id="sec.64-ssec.3" guid="_3e3d5f05-daf1-437c-9298-1fbfaec652a2" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The applicant may, before the application is decided, give a notice (a <defterm id="sec.64-def.deemedapprovalnotice" guid="_724e0008-3583-4510-bc76-3b96d47fcf5c" type="definition">deemed approval notice</defterm>), in the approved form, that states the application should be approved, to the assessment manager.</txt></block></subclause><subclause id="sec.64-ssec.4" guid="_1dacbc95-1668-4e3d-94f9-5883a8fa3b8d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The applicant must give a copy of the deemed approval notice to each person stated in section 63(1)(b) to (d) for the application.</txt></block></subclause><subclause id="sec.64-ssec.5" guid="_ae1b9ba2-147d-454c-afbc-865cb25af095" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">On the day the assessment manager receives the deemed approval notice, the assessment manager is taken to have given an approval (a <defterm id="sec.64-def.deemedapproval" guid="_ec466416-21c9-470e-9702-a87de520396f" type="definition">deemed approval</defterm>) to the applicant.</txt></block></subclause><subclause id="sec.64-ssec.6" guid="_a7b61f60-7ba9-4b97-985e-63a1d17a8519" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">The assessment manager may, within 10 business days after receiving the deemed approval notice, give the applicant a decision notice, in the approved form, in which the decision—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.64-ssec.6-para1.a" guid="_f56987ff-5e0e-4ab6-8ae9-4f8991fe6055" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">approves the application; or</txt></block></li><li id="sec.64-ssec.6-para1.b" guid="_38e916d8-bd43-4048-9910-d331a8e9054e" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">approves the application subject to development conditions.</txt></block></li></list></block></subclause><subclause id="sec.64-ssec.7" guid="_07f1023b-c187-4ca1-8321-bccdef23453e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">The deemed approval is taken to be—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.64-ssec.7-para1.a" guid="_575bcdf0-64ce-4e6f-949c-7518ad407c57" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">to the extent a referral agency or the Minister has directed the approval be a preliminary approval—a preliminary approval; or</txt></block></li><li id="sec.64-ssec.7-para1.b" guid="_273036c9-6e52-4f12-ac7f-36614e0afda3" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">otherwise—the type or types of approval applied for.</txt></block></li></list></block></subclause><subclause id="sec.64-ssec.8" guid="_68841162-27e8-44a0-b4bc-e09500d97dab" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(8)</no><block status="uncommenced"><txt break.before="1">The deemed approval is taken to include—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.64-ssec.8-para1.a" guid="_2c32caad-49ad-45ae-ba28-2a16742e5ce3" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">any conditions that a referral agency’s response directed the assessment manager to impose; and</txt></block></li><li id="sec.64-ssec.8-para1.b" guid="_e5f9198c-e33b-498b-83a5-feefd4576aaa" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">any conditions that the Minister directed the assessment manager to impose under section 95(1)(d); and</txt></block></li><li id="sec.64-ssec.8-para1.c" guid="_77bb84cc-cba1-4257-bd0b-a7d751399006" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">if the assessment manager does not give a decision notice to the applicant under this section—the standard conditions in the development assessment rules.</txt></block></li></list></block></subclause></clause></division><division id="ch.3-pt.3-div.3" guid="_21e95319-1735-4c84-a21c-2f736fda3204" status="uncommenced" affected.by.uncommenced="0"><no>Division 3</no><heading id="ch.3-pt.3-div.3-he" guid="_09ee7d09-404e-445c-b1ae-645db618a537">Development conditions</heading><clause id="sec.65" guid="_685eb107-e6f2-496a-8b74-1f86474cb661" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>65</no><heading id="sec.65-he" guid="_5cac3830-5671-498a-ba27-e23666ad2ddf">Permitted development conditions</heading><subclause id="sec.65-ssec.1" guid="_42d5c7db-6083-432a-ab28-aeacded45943" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A development condition imposed on a development approval must—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.65-ssec.1-para1.a" guid="_b5112b9d-f1ef-42d6-b474-3a4a00bdcc13" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">be relevant to, but not be an unreasonable imposition on, the development or the use of premises as a consequence of the development; or</txt></block></li><li id="sec.65-ssec.1-para1.b" guid="_c5a1976c-d414-41ac-8db7-d34ee0bb3c05" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">be reasonably required in relation to the development or the use of premises as a consequence of the development.</txt></block></li></list></block></subclause><subclause id="sec.65-ssec.2" guid="_041ef1ca-25b2-4958-beb8-6e3c2c99327c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">A development condition may—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.65-ssec.2-para1.a" guid="_c12e0fa3-7f06-4e43-ad1e-8b2eb8e5e7a5" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">limit how long—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.65-ssec.2-para1.a-para2.i" guid="_76aa5974-0597-4dbd-8f4d-8828ebc0bc93" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a lawful use may continue; or</txt></block></li><li id="sec.65-ssec.2-para1.a-para2.ii" guid="_d7fe5028-9d15-49e8-908c-70b4fc9d01cc" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">works may remain in place; or</txt></block></li></list></block></li><li id="sec.65-ssec.2-para1.b" guid="_20c9e853-4481-49a5-92bb-855f0be540eb" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">state that development must not start until—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.65-ssec.2-para1.b-para2.i" guid="_11a53be8-3b11-4d60-8dd7-a17a63826976" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">other development permits for development on the same premises have been given; or</txt></block></li><li id="sec.65-ssec.2-para1.b-para2.ii" guid="_31a6b676-6044-4dd8-9334-31ffb3be3546" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">other development on the same premises, including development that the development application does not cover, has been substantially started or completed; or</txt></block></li></list><note id="sec.65-ssec.2-para1.b-note" guid="_6c51660d-ace5-4cad-8a88-1b9a060f84ab" type="example"><heading id="sec.65-ssec.2-para1.b-note-he" guid="_09ad5423-489a-489d-a471-06c6fdcea391">Note—</heading><block status="uncommenced"><txt break.before="1">For when development can otherwise start, see section 72.</txt></block></note></block></li><li id="sec.65-ssec.2-para1.c" guid="_c83fe168-0b08-40ce-8ae4-346ad9b3cbbd" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">require compliance with an infrastructure agreement for the premises; or</txt></block></li><li id="sec.65-ssec.2-para1.d" guid="_00cffa8a-c0c9-4641-a653-2cd22c2fe02f" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">require development, or a part of development, to be completed within a stated period; or</txt></block></li><li id="sec.65-ssec.2-para1.e" guid="_995f5c37-7267-4125-99a3-ad41d9430630" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">require the payment of security under an agreement under section 67 to support a requirement under paragraph (d).</txt></block></li></list><note id="sec.65-ssec.2-note" guid="_b7cd455d-dba8-44e4-8fba-23de90c9eed8" type="example"><heading id="sec.65-ssec.2-note-he" guid="_f6292016-7d09-466f-8336-415eeaf9999e">Notes—</heading><block status="uncommenced"><list number.type="manual" unnumbered.indent="0"><li id="sec.65-ssec.2-note-para1.1" guid="_f5950d0d-80f5-4ddd-b864-c08b5728f365" status="uncommenced" provision.type="other"><no>1</no><block status="uncommenced"><txt break.before="1">See chapter 4, parts 2 and 3 for other permitted development conditions.</txt></block></li><li id="sec.65-ssec.2-note-para1.2" guid="_dbca2a93-ae6a-4455-9e62-a957fbd86fa7" status="uncommenced" provision.type="other"><no>2</no><block status="uncommenced"><txt break.before="1">In addition to development conditions under this Act, a land surrender requirement under the Coastal Act may be made in relation to particular land that is the subject of a development approval for reconfiguring a lot in a coastal management district under the Coastal Act. However, a land surrender requirement is not a development condition under this Act.</txt></block></li></list></block></note></block></subclause></clause><clause id="sec.66" guid="_6c7082b5-d6dc-428d-b2eb-e77dc278537f" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>66</no><heading id="sec.66-he" guid="_45518b58-9aab-43f4-b7eb-49200872687a">Prohibited development conditions</heading><subclause id="sec.66-ssec.1" guid="_c81bce49-1f70-49dd-b8b8-70b8f87c923c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A development condition must not—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.66-ssec.1-para1.a" guid="_cfa8c9c5-23f2-476c-9b9a-93a8246848c2" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">require a person other than the applicant to carry out works for the development; or</txt></block></li><li id="sec.66-ssec.1-para1.b" guid="_e9e6f708-89e8-4e4e-b957-5140f6ca1466" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">require a person to enter into an infrastructure agreement; or</txt></block></li><li id="sec.66-ssec.1-para1.c" guid="_63df1afb-59c2-46d5-b0ab-9be72c86a57a" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">other than under chapter 4, part 2 or 3, require a monetary payment for the establishment, operating or maintenance costs of, works to be carried out for, or land to be given for—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.66-ssec.1-para1.c-para2.i" guid="_a3f4a3c4-c684-4cb5-a31f-525310e9529f" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">infrastructure; or</txt></block></li><li id="sec.66-ssec.1-para1.c-para2.ii" guid="_5305ef8b-875e-4a13-9ec9-05d62be15fc6" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">for the imposition of a condition by a State infrastructure provider—infrastructure or works to protect the operation of the infrastructure; or</txt></block></li></list></block></li><li id="sec.66-ssec.1-para1.d" guid="_a87a554f-dde6-4f60-8371-585f610e5761" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">require an access restriction strip; or</txt></block></li><li id="sec.66-ssec.1-para1.e" guid="_ee8ceae4-b03d-4ef5-8bbc-4d49a329d7f7" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">limit the period a development approval has effect for a use or works forming part of a network of infrastructure, other than State-owned or State-controlled transport infrastructure; or</txt></block></li><li id="sec.66-ssec.1-para1.f" guid="_efccbe52-d68c-401b-a603-2d0be4792309" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">relate to water infrastructure about a matter for which the SEQ Water Act requires a water approval.</txt><note id="sec.66-ssec.1-para1.f-note" guid="_b3f59b34-7d37-4bab-af23-5c68093f8451" type="example"><heading id="sec.66-ssec.1-para1.f-note-he" guid="_8e0fe889-e49a-4e05-9ab4-08dd58cfcd04">Examples for paragraph (f)—</heading><block status="uncommenced"><txt break.before="1">A development condition that requires—</txt><list number.type="bull" unnumbered.indent="0"><li id="sec.66-ssec.1-para1.f-note-para2" guid="_a15acd20-a7a0-4689-92cd-84babc92d16e" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">works to be carried out</txt></block></li><li id="sec.66-ssec.1-para1.f-note-para2-oc.2" guid="_d0ce3985-35fc-46d6-a8a0-5f5c256ddab5" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">a monetary payment</txt></block></li><li id="sec.66-ssec.1-para1.f-note-para2-oc.3" guid="_317c8fa8-2477-42a2-bb85-f707db60b65d" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">land in fee simple to be given.</txt></block></li></list></block></note></block></li></list></block></subclause><subclause id="sec.66-ssec.2" guid="_64a5f15f-eb45-4dd8-83cb-8c0a5823616f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">A development condition must not be inconsistent with a development condition of an earlier development approval in effect for the development, unless—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.66-ssec.2-para1.a" guid="_1759a86a-081e-444c-a270-4e094f683c8e" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the same person imposes the conditions; and</txt></block></li><li id="sec.66-ssec.2-para1.b" guid="_7bff3bcc-eb23-4ee0-9be6-f68d5832068c" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the applicant agrees in writing to the later condition applying; and</txt></block></li><li id="sec.66-ssec.2-para1.c" guid="_83384e9c-c128-4ac4-9065-e221ca3aa3f5" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">if the applicant is not the owner of the premises when the later development application is made—the owner agrees in writing to the later condition applying.</txt></block></li></list></block></subclause><subclause id="sec.66-ssec.3" guid="_bd7a3999-20fc-46b2-9aec-1b79831ac259" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">A development condition that complies with subsection (2) 	applies instead of the earlier condition.</txt><note id="sec.66-ssec.3-note" guid="_22b71527-55db-4806-9d92-a479c8d18aac" type="example"><heading id="sec.66-ssec.3-note-he" guid="_55a6637a-86d3-40c3-a182-956e2ee2efe6">Note—</heading><block status="uncommenced"><txt break.before="1">For other limits on development conditions about environmental offsets, see the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Environmental Offsets Act 2014</name></legref>, section 14.</txt></block></note></block></subclause></clause><clause id="sec.67" guid="_e201c383-2a52-4070-a4d0-ed845c15ca1f" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>67</no><heading id="sec.67-he" guid="_647ff40a-f48c-43c0-a14b-67c207407983">Agreements about development conditions</heading><block status="uncommenced"><txt break.before="1">An applicant for a development application may make an agreement with an assessment manager, referral agency or other person to establish the responsibilities, or secure the performance, of a party to the agreement about a development condition.</txt></block></clause></division></part><part id="ch.3-pt.4" guid="_be2748c7-4262-48f9-9fd6-e8ebf4c6fddc" status="uncommenced" affected.by.uncommenced="0"><no>Part 4</no><heading id="ch.3-pt.4-he" guid="_553756f4-9d25-4bc7-97ad-35404ce5db90">Development assessment rules</heading><clause id="sec.68" guid="_bdcceb87-baae-4c70-9477-c7c6dc214323" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>68</no><heading id="sec.68-he" guid="_bdd5bf97-e40d-4379-9531-f2fdac76f4dc">Development assessment rules</heading><subclause id="sec.68-ssec.1" guid="_a2fd46d8-fe62-4057-abd0-278d10d077fb" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The Minister must make rules (the <defterm id="sec.68-def.developmentassessmentrules" guid="_69b4f661-6a1a-4958-b038-1045260cc34e" type="definition">development assessment rules</defterm>) for the development assessment process, including rules about—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.68-ssec.1-para1.a" guid="_186eacba-09da-4427-b8bf-7d74a1d0812b" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">how and when notification is to be carried out under section 53, including re-notifying the application if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.68-ssec.1-para1.a-para2.i" guid="_50ed041d-6772-4f12-845e-45d428ccd763" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the applicant changes the application under section 52; and</txt></block></li><li id="sec.68-ssec.1-para1.a-para2.ii" guid="_a41fac7b-6289-4cca-bc03-47abf5838869" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the notice under section 53(1) has been given; and</txt></block></li><li id="sec.68-ssec.1-para1.a-para2.iii" guid="_6e7ca9de-6cfb-4e76-9692-1e59b7c922e6" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">the change is not a minor change; and</txt></block></li><li id="sec.68-ssec.1-para1.a-para2.iv" guid="_d5ae2797-27a8-47ee-802f-754045953825" status="uncommenced" provision.type="other"><no>(iv)</no><block status="uncommenced"><txt break.before="1">the assessment manager is not satisfied that the change would be unlikely to attract a submission about the matter that is the subject of the change; and</txt></block></li><li id="sec.68-ssec.1-para1.a-para2.v" guid="_4e354f47-4d04-4a4f-8173-f511b3e7039e" status="uncommenced" provision.type="other"><no>(v)</no><block status="uncommenced"><txt break.before="1">the assessment manager is not satisfied the change only addresses a matter raised in a properly made submission; and</txt></block></li></list></block></li><li id="sec.68-ssec.1-para1.b" guid="_22565704-01aa-4242-8c38-528f9fd96fa7" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the consideration of properly made submissions.</txt></block></li></list></block></subclause><subclause id="sec.68-ssec.2" guid="_31f0cc7e-f865-4001-991e-901220020c35" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">Also, the development assessment rules may provide for—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.68-ssec.2-para1.a" guid="_a53ff4bb-ef1c-446e-8b24-b5cf98a392ae" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">when a development application may be taken to be properly made for section 51(5); or</txt></block></li><li id="sec.68-ssec.2-para1.b" guid="_44180bec-4d6e-4017-a000-c5097ba119ea" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the effect on a development application of the expiry of a time limit under, or of a contravention of, the rules (the lapsing of the application, for example); or</txt></block></li><li id="sec.68-ssec.2-para1.c" guid="_901d2eba-0406-4950-b42c-3933da6a8b1b" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the revival of lapsed applications; or</txt></block></li><li id="sec.68-ssec.2-para1.d" guid="_208705ec-4c49-4b2d-8a0d-f623d71d1364" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">how and when a referral agency may change its response before a development application or change application is decided; or</txt></block></li><li id="sec.68-ssec.2-para1.e" guid="_aebde6ab-4729-4c44-bca1-cbf6449699f8" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">the standard conditions for a deemed approval; or</txt></block></li><li id="sec.68-ssec.2-para1.f" guid="_885b4a9e-a4e8-4e47-b945-996bef547ccb" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">any matter in relation to part 5, divisions 2 to 4; or</txt></block></li><li id="sec.68-ssec.2-para1.g" guid="_08358f64-c659-4182-b030-85268a9e600a" status="uncommenced" provision.type="other"><no>(g)</no><block status="uncommenced"><txt break.before="1">the effect on a process under this chapter of taking action under the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Native Title Act 1993</name> (Cwlth)</legref>, part 2, division 3.</txt></block></li></list><note id="sec.68-ssec.2-note" guid="_dc93c122-2ff6-4f79-9f6d-382f65f33be2" type="example"><heading id="sec.68-ssec.2-note-he" guid="_79fd796e-4abf-44ee-988d-8d42024f358b">Examples—</heading><block status="uncommenced"><list number.type="bull" unnumbered.indent="0"><li id="sec.68-ssec.2-note-para1" guid="_4088ef62-e197-4b54-ba3c-3127d5d8a768" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">the effect, for section 52, of different types of change on a development application</txt></block></li><li id="sec.68-ssec.2-note-para1-oc.2" guid="_cf4e2222-d053-4fce-babd-23bf33e1bca3" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">the period for making referral agency’s responses, including when the responses may be made late</txt></block></li><li id="sec.68-ssec.2-note-para1-oc.3" guid="_745e2ee9-3cce-4b53-9a1c-7df9d846598a" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">matters to be considered when deciding whether a change to a development application or development approval would result in substantially different development</txt></block></li><li id="sec.68-ssec.2-note-para1-oc.4" guid="_8438c189-c891-498d-89a1-7808aad24c24" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">matters to be considered when deciding if an action is a material change of use</txt></block></li><li id="sec.68-ssec.2-note-para1-oc.5" guid="_6f7003f7-a480-422e-ae5e-6d1206c3b3bf" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">the periods for taking actions under the process</txt></block></li><li id="sec.68-ssec.2-note-para1-oc.6" guid="_e1eccdb9-f74f-4446-a438-233958cbcb4f" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">the effect of not taking the actions within the periods</txt></block></li><li id="sec.68-ssec.2-note-para1-oc.7" guid="_417619ab-1544-436f-8011-b916e06a65a9" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">provisions for information requests, and when and how the information can be sought</txt></block></li></list></block></note></block></subclause><subclause id="sec.68-ssec.3" guid="_3fe3781d-324d-47e7-b2f0-8df8773e8262" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">Section 10 applies to making the development assessment rules as if the rules were a State planning policy.</txt></block></subclause><subclause id="sec.68-ssec.4" guid="_e9fa3d43-b70c-4a36-b23e-52dda4ad6fdf" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The development assessment rules do not have effect unless prescribed by regulation.</txt></block></subclause><subclause id="sec.68-ssec.5" guid="_4ba42291-e509-42ea-a5ec-46c78def2fcf" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">However, the development assessment rules are not subordinate legislation.</txt></block></subclause></clause><clause id="sec.69" guid="_b61a1d49-7b4d-441d-9440-a5181ad6aeff" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>69</no><heading id="sec.69-he" guid="_69368c22-695a-4d15-bd2a-b0ce6a44605e">Amending the rules</heading><subclause id="sec.69-ssec.1" guid="_c7dea5eb-5ad7-481d-b2f9-72cf17453f90" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The Minister may amend the development assessment rules.</txt></block></subclause><subclause id="sec.69-ssec.2" guid="_0530e02f-678c-4c5b-8d37-efe19816bdcd" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, the amendment does not have effect until—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.69-ssec.2-para1.a" guid="_c7bc900b-8b37-4a06-9ee9-b3dad40d5b31" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the chief executive publishes both the amendment, and the rules as amended, on the department’s website; and</txt></block></li><li id="sec.69-ssec.2-para1.b" guid="_a452e143-dff3-437f-9c7a-3e5baea3943f" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the rules as amended are prescribed by regulation.</txt></block></li></list></block></subclause><subclause id="sec.69-ssec.3" guid="_7d8101ba-94de-44c0-ad8a-ade24678b9b2" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">Sections 10 and 11 apply to amending the development assessment rules as if the rules were a State planning policy.</txt></block></subclause><subclause id="sec.69-ssec.4" guid="_7071ee24-6170-4398-815d-4e68ab579e75" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The regulation must state the day the amendment was published.</txt></block></subclause></clause><clause id="sec.70" guid="_974fbbda-d8e2-4cb3-82fd-8a1a6f7a2b70" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>70</no><heading id="sec.70-he" guid="_d5894243-aaec-4d9a-a6a2-4a9a3607298c">Access to and evidence of the rules</heading><subclause id="sec.70-ssec.1" guid="_8ffefe1f-ba09-4635-9c51-66f359b83205" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The chief executive must keep the following on the department’s website—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.70-ssec.1-para1.a" guid="_27289ade-eb19-4ea3-88d2-7266dca832e2" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the development assessment rules, as in effect from time to time;</txt></block></li><li id="sec.70-ssec.1-para1.b" guid="_2f92db05-55a9-463f-94c7-0ad837305f1e" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">endnotes to the development assessment rules that state—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.70-ssec.1-para1.b-para2.i" guid="_2b7fe210-f24b-4179-a312-63f207d6dfd1" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">when all amendments made to the rules took effect; and</txt></block></li><li id="sec.70-ssec.1-para1.b-para2.ii" guid="_0212c128-027f-4170-a9c8-d3b168d55953" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">details of each regulation that prescribes the rules;</txt></block></li></list></block></li><li id="sec.70-ssec.1-para1.c" guid="_13d1433f-0ced-44bb-850d-8a026b122970" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">any superseded versions of the development assessment rules.</txt></block></li></list></block></subclause><subclause id="sec.70-ssec.2" guid="_e4a01a8c-3255-4c14-b8ec-e8c4891c466c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The following provisions apply to the rules as if the rules were subordinate legislation and as if a reference in the provisions to the parliamentary counsel were a reference to the chief executive—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.70-ssec.2-para1.a" guid="_26ed54c0-bf38-4121-8189-29750ffaef27" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Legislative Standards Act 1992</name></legref>, section 10A;</txt></block></li><li id="sec.70-ssec.2-para1.b" guid="_34bc83dc-2567-408d-82cb-690c4e54fb06" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Evidence Act 1977</name></legref>, sections 43(h) and 46A.</txt></block></li></list></block></subclause><subclause id="sec.70-ssec.3" guid="_51c012b7-dc07-48d1-9a16-4f501eeab263" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">A failure to comply with subsection (1) does not invalidate or otherwise affect the rules.</txt></block></subclause></clause></part><part id="ch.3-pt.5" guid="_0a809e55-b8ef-4498-b47f-f52babcc5046" status="uncommenced" affected.by.uncommenced="0"><no>Part 5</no><heading id="ch.3-pt.5-he" guid="_02d6b9d8-e4a9-403a-b668-dc066a7c5a7c">Development approvals</heading><division id="ch.3-pt.5-div.1" guid="_caca6857-b220-4700-880a-e2be09da6ce0" status="uncommenced" affected.by.uncommenced="0"><no>Division 1</no><heading id="ch.3-pt.5-div.1-he" guid="_474239a3-9d08-424c-acea-90504552013d">Effect of development approval</heading><clause id="sec.71" guid="_cdd19e2a-519e-42a7-befc-a8bd725d2fb7" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>71</no><heading id="sec.71-he" guid="_8a57cb73-94b9-40d9-907f-594d3d8b4a31">When development approval has effect</heading><subclause id="sec.71-ssec.1" guid="_e4c4263c-bcaf-4b16-8a4f-de5d571ca13c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">Generally, a development approval starts to have effect when the approval is given, or taken to have been given, to the applicant.</txt></block></subclause><subclause id="sec.71-ssec.2" guid="_7fa0c641-05df-4adc-bf26-fec8996cfcab" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.71-ssec.2-para1.a" guid="_332883d1-31be-4571-83a9-e548679f11e8" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if an appeal about the approval is started, and subject to the outcome of the appeal—the approval starts to have effect when the appeal ends; or</txt></block></li><li id="sec.71-ssec.2-para1.b" guid="_c41a6b82-2f36-4e36-befa-fd209da13e2c" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if no appeal about the approval is started, but there was a submitter for the development application who had not given the assessment manager a notice withdrawing the submitter’s submission before the application was decided—the approval starts to have effect on the day after the first of the following happens—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.71-ssec.2-para1.b-para2.i" guid="_c63fe37f-bbe7-45a4-a410-775893fa3d78" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the last submitter gives the assessment manager notice that the submitter will not be appealing the decision;</txt></block></li><li id="sec.71-ssec.2-para1.b-para2.ii" guid="_9735fd42-3742-42df-a34b-ad5afc1fd06b" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the last appeal period for the development approval ends.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.71-ssec.3" guid="_fd00b459-c2e2-4eff-8279-074e5505f724" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The assessment manager must give the applicant a copy of any notice under subsection (2)(b).</txt></block></subclause><subclause id="sec.71-ssec.4" guid="_565b799e-4e49-40d5-8fbd-28c5b400858a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">Despite subsections (1) and (2), if land that is the subject of an acquisition approval is taken or acquired under the Acquisition Act or the State Development Act after the approval would otherwise take effect under subsection (1) or (2), the approval starts to have effect when the land is taken or acquired.</txt></block></subclause><subclause id="sec.71-ssec.5" guid="_4062992f-60e4-45f7-aca9-2ce448137744" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The part of a variation approval that is a categorising instrument applies instead of a local planning instrument, to the extent of any inconsistency, until—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.71-ssec.5-para1.a" guid="_fd7208ce-b741-4633-94b9-3e5a33e41aac" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the development is completed; or</txt></block></li><li id="sec.71-ssec.5-para1.b" guid="_00f3c150-7f66-4f33-8645-4f6b567027f2" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the variation approval lapses under section 88(2).</txt></block></li></list></block></subclause><subclause id="sec.71-ssec.6" guid="_75db3950-6ee0-4410-b76b-6aa504982527" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.71-ssec.6-def.acquisitionapproval_" guid="_7507bb4d-7af6-4406-88ac-67254430d9fe" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.71-ssec.6-def.acquisitionapproval" guid="_850f831b-3abd-4f83-8b75-a16727037c94" type="definition">acquisition approval</defterm>, for acquisition land, means a development approval that relates to the purpose for which the land is to be taken or acquired.</txt></definition><definition id="sec.71-ssec.6-def.submitter_" guid="_9ca43745-efeb-4f58-b1a2-e6ded524815f" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.71-ssec.6-def.submitter" guid="_ba04c1e1-ec9f-444e-be14-0bcaa33c656c" type="definition">submitter</defterm> includes an advice agency that, in its referral agency’s response, has told the assessment manager to treat the response as a properly made submission.</txt></definition></deflist></block></subclause></clause><clause id="sec.72" guid="_c509738a-4d24-45ec-a7ef-7248b5adf15d" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>72</no><heading id="sec.72-he" guid="_3a622187-7057-44ab-9090-51c4f1ac0ba7">When development may start</heading><subclause id="sec.72-ssec.1" guid="_d527e760-5a57-4e82-8ca3-6e2832d6f117" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">Development under a development approval may start when—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.72-ssec.1-para1.a" guid="_c212fa8d-068b-490d-8343-9e8307217ef2" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">all development permits for the development have started to have effect; and</txt></block></li><li id="sec.72-ssec.1-para1.b" guid="_24c8999d-561d-43bd-ad45-065e12e163ca" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">all development conditions of the permits that are required to be complied with before development starts have been complied with.</txt></block></li></list></block></subclause><subclause id="sec.72-ssec.2" guid="_1abded92-ef23-4ff8-b444-c5aa19a40702" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, if an appeal is started in relation to a development approval, other than an appeal about a change application or extension application, development must not start until—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.72-ssec.2-para1.a" guid="_6a5c41e8-1181-4334-b251-b0cd5ec7cda5" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the appeal ends; or</txt></block></li><li id="sec.72-ssec.2-para1.b" guid="_dbd9ccde-1e5d-4a15-98f5-31f9bdc7b984" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the tribunal or court hearing the appeal allows all or part of the development to start, because the tribunal or court considers the outcome of the appeal would not be affected.</txt></block></li></list></block></subclause></clause><clause id="sec.73" guid="_f3d8ff3f-69be-4184-ab54-9317b2f9ae04" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>73</no><heading id="sec.73-he" guid="_3525f65c-bf84-49aa-9995-ccddab2befc6">Attachment to the premises</heading><block status="uncommenced"><txt break.before="1">While a development approval is in effect, the approval—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.73-para1.a" guid="_593cc84e-09de-471a-9308-9061b86b792d" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">attaches to the premises, even if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.73-para1.a-para2.i" guid="_13cbea8c-9b2e-4d2a-9b77-126223cd070b" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a later development (including reconfiguring a lot) is approved for the premises; or</txt></block></li><li id="sec.73-para1.a-para2.ii" guid="_84f850b8-1787-4ac2-9db2-aa3dd7f9c78c" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the premises are reconfigured; and</txt></block></li></list></block></li><li id="sec.73-para1.b" guid="_d44634bd-34ba-4753-99b9-58e177a30138" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">binds the owner, the owner’s successors in title, and any occupier of the premises.</txt></block></li></list></block></clause></division><division id="ch.3-pt.5-div.2" guid="_77dc476a-cccb-49b1-976b-5afe24d8955f" status="uncommenced" affected.by.uncommenced="0"><no>Division 2</no><heading id="ch.3-pt.5-div.2-he" guid="_f6eceabb-bf01-4dd2-a306-f3f67e04b8dc">Changing development approvals</heading><subdivision id="ch.3-pt.5-div.2-sdiv.1" guid="_e9627054-27c8-48c9-854a-8e8216e3f46e" status="uncommenced" affected.by.uncommenced="0"><no>Subdivision 1</no><heading id="ch.3-pt.5-div.2-sdiv.1-he" guid="_773bda9a-a123-4b52-b10a-4f69dc9b8d4c">Changes during appeal period</heading><clause id="sec.74" guid="_85a4c9bd-b6d5-4afa-aa6b-7ee9b6717350" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>74</no><heading id="sec.74-he" guid="_70b7ad6a-ac81-4dee-bb74-d83066a6215f">What this subdivision is about</heading><block status="uncommenced"><txt break.before="1">This subdivision is about changing a development approval before the applicant’s appeal period for the approval ends.</txt></block></clause><clause id="sec.75" guid="_6118d193-824b-4c5e-8485-ff70e1232615" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>75</no><heading id="sec.75-he" guid="_194b0dfd-dfc9-4128-b980-6784c5e05400">Making change representations</heading><subclause id="sec.75-ssec.1" guid="_74057f5b-ebc4-48ae-92e2-1c65b2a24ad9" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The applicant may make representations (<defterm id="sec.75-def.changerepresentations" guid="_76d49d7f-7fe9-49df-a08c-e3b9db775d57" type="definition">change representations</defterm>) to the assessment manager, during the applicant’s appeal period for the approval, about changing—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.75-ssec.1-para1.a" guid="_159f722e-4394-4553-af31-49eb79d7f468" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a matter in the development approval, other than—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.75-ssec.1-para1.a-para2.i" guid="_d348d287-bfc1-46cf-b6f1-56a2b4f63a9c" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a matter stated because of a referral agency’s response; or</txt></block></li><li id="sec.75-ssec.1-para1.a-para2.ii" guid="_7ecc336e-f833-4e3c-824e-58824db414b2" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">a development condition imposed under a direction made by the Minister under chapter 3, part 6, division 2; or</txt></block></li></list></block></li><li id="sec.75-ssec.1-para1.b" guid="_bf0e4c88-4fe3-434c-8f21-c0aa9dd36336" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the standard conditions of a deemed approval.</txt></block></li></list></block></subclause><subclause id="sec.75-ssec.2" guid="_546d5446-9659-4852-b4d1-0fb10b74e20d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">If the applicant needs more time to make the change representations, the applicant may, during the applicant’s appeal period for the approval, suspend the appeal period by a notice given to the assessment manager.</txt></block></subclause><subclause id="sec.75-ssec.3" guid="_276bcacc-1078-4c7a-991a-185627fc91ce" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">Only 1 notice may be given.</txt></block></subclause><subclause id="sec.75-ssec.4" guid="_7c33937c-c342-42cb-8c04-7c0df00f3cf5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">If a notice is given, the appeal period is suspended—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.75-ssec.4-para1.a" guid="_ddc03184-8bc9-4bf3-9b61-2746bc460be5" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if the change representations are not made within a period of 20 business days after the notice is given to the assessment manager—until the end of that period; or</txt></block></li><li id="sec.75-ssec.4-para1.b" guid="_ce3b14c6-fc45-48f1-9f3a-b21ee986b66b" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the change representations are made within 20 business days after the notice is given to the assessment manager, until—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.75-ssec.4-para1.b-para2.i" guid="_8bc94643-4d17-4e83-9460-f09df9a3023c" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the applicant withdraws the notice, by giving another notice to the assessment manager; or</txt></block></li><li id="sec.75-ssec.4-para1.b-para2.ii" guid="_98657d50-be3a-4c10-b57b-69bc0e9bd56f" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the applicant receives notice that the assessment manager does not agree with the change representations; or</txt></block></li><li id="sec.75-ssec.4-para1.b-para2.iii" guid="_7f48a04f-fc8a-4390-8f70-fd756d3a3e8c" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">the end of 20 business days after the change representations are made, or a longer period agreed in writing between the applicant and the assessment manager.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.75-ssec.5" guid="_41ee8bad-c7e1-4704-989d-6edfb86ad4c7" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">However, if the assessment manager gives the applicant a negotiated decision notice, the appeal period starts again on the day after the negotiated decision notice is given.</txt></block></subclause></clause><clause id="sec.76" guid="_85da2f4e-5131-4608-a97b-6754a1827536" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>76</no><heading id="sec.76-he" guid="_06b81beb-45bb-4a8b-afdc-eb9acc674c36">Deciding change representations</heading><subclause id="sec.76-ssec.1" guid="_bd2f71f4-0738-4519-ac3d-3295ed4000c8" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The assessment manager must assess the change representations against and having regard to the matters that must be considered when assessing a development application, to the extent those matters are relevant.</txt></block></subclause><subclause id="sec.76-ssec.2" guid="_4afae73c-d4f9-473a-bb1a-59c95f2cabbd" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The assessment manager must, within 5 business days after deciding the change representations, give a decision notice to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.76-ssec.2-para1.a" guid="_778061ba-e7a2-4f83-9d10-d3850e6aea3b" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the applicant; and</txt></block></li><li id="sec.76-ssec.2-para1.b" guid="_55afe113-caa2-405d-9c8b-05687c76a9a3" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the assessment manager agrees with any of the change representations—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.76-ssec.2-para1.b-para2.i" guid="_40c7f90a-592a-42cf-bda7-a8fc9bb351ca" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">each principal submitter; and</txt></block></li><li id="sec.76-ssec.2-para1.b-para2.ii" guid="_769627fa-3d8b-4413-a5f5-3e5d2d569fae" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">each referral agency; and</txt></block></li><li id="sec.76-ssec.2-para1.b-para2.iii" guid="_77c926d8-dc1a-4752-8125-1f5dda34250d" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">if the assessment manager is not a local government and the development is in a local government area—the relevant local government; and</txt></block></li><li id="sec.76-ssec.2-para1.b-para2.iv" guid="_2a200c3d-6eb2-4245-a7aa-f10dcff6f039" status="uncommenced" provision.type="other"><no>(iv)</no><block status="uncommenced"><txt break.before="1">if the assessment manager is a chosen assessment manager—the prescribed assessment manager; and</txt></block></li><li id="sec.76-ssec.2-para1.b-para2.v" guid="_9e24dc22-75d2-4172-959c-df71bd4efed5" status="uncommenced" provision.type="other"><no>(v)</no><block status="uncommenced"><txt break.before="1">another person prescribed by regulation.</txt></block></li></list></block></li></list><note id="sec.76-ssec.2-note" guid="_d422db00-b798-49f5-aab9-6a661c2177c9" type="example"><heading id="sec.76-ssec.2-note-he" guid="_08d456f2-9a9f-4a4d-9ef5-63c980841e69">Note—</heading><block status="uncommenced"><txt break.before="1">See the development assessment rules for when the notice is to be given.</txt></block></note></block></subclause><subclause id="sec.76-ssec.3" guid="_f30464b2-6c50-4898-a6df-c74127c4a94b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">A decision notice (a <defterm id="sec.76-def.negotiateddecisionnotice" guid="_157b4c5b-d586-4ac1-a861-6734b087c2b7" type="definition">negotiated decision notice</defterm>) that states the assessment manager agrees with a change representation must—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.76-ssec.3-para1.a" guid="_32a9104f-8836-4d7f-bdd2-768b13354892" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">state the nature of the change agreed to; and</txt></block></li><li id="sec.76-ssec.3-para1.b" guid="_ec2bfeb3-3086-4646-8b41-38645d46a5b5" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">comply with section 63(2) and (3).</txt></block></li></list></block></subclause><subclause id="sec.76-ssec.4" guid="_28189e32-931a-46e0-9904-b9035ba81d57" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">A negotiated decision notice replaces the decision notice for the development application.</txt></block></subclause><subclause id="sec.76-ssec.5" guid="_3688da68-10f9-41ae-9c19-05d7b2267a0a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">Only 1 negotiated decision notice may be given.</txt></block></subclause><subclause id="sec.76-ssec.6" guid="_9f620af2-1258-4b63-8786-5a959f93a7e3" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">If a negotiated decision notice is given to an applicant, a local government may give a replacement infrastructure charges notice to the applicant.</txt></block></subclause></clause></subdivision><subdivision id="ch.3-pt.5-div.2-sdiv.2" guid="_2d8f2d9c-3d9b-4caf-a323-0fb17a02a377" status="uncommenced" affected.by.uncommenced="0"><no>Subdivision 2</no><heading id="ch.3-pt.5-div.2-sdiv.2-he" guid="_0bc244bd-db94-4fa8-a9d1-c551b3d538e8">Changes after appeal period</heading><clause id="sec.77" guid="_22a5b148-7d27-4614-8070-96fbc8c25ecb" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>77</no><heading id="sec.77-he" guid="_0ac44db8-d9c0-4ead-b0d3-5edede7ad119">What this subdivision is about</heading><block status="uncommenced"><txt break.before="1">This subdivision is about changing a development approval, other than the currency period, after all appeal periods in relation to the approval end.</txt></block></clause><clause id="sec.78" guid="_ee229729-23c0-46cc-a112-446f9a5acb66" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>78</no><heading id="sec.78-he" guid="_91292eb9-9b82-4594-9058-17c79204601b">Making change application</heading><subclause id="sec.78-ssec.1" guid="_65795483-e23d-4f6c-80fc-bde903849903" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A person may make an application (a <defterm id="sec.78-def.changeapplication" guid="_fa00dbfe-a3af-40b3-a3c8-15ff73a12ef5" type="definition">change application</defterm>) to change a development approval.</txt></block></subclause><subclause id="sec.78-ssec.2" guid="_bbc1f8e6-496f-46cd-95e7-01870447d6df" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">A change application must be made to the responsible entity.</txt></block></subclause><subclause id="sec.78-ssec.3" guid="_6d029faf-5f80-43cb-b76c-5355772f3048" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The <defterm id="sec.78-def.responsibleentity" guid="_38ab75d6-75cc-4325-b0dd-d737b1aac27f" type="definition">responsible entity</defterm> is—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.78-ssec.3-para1.a" guid="_22dbfd48-c87e-4edb-9cbd-798092bfd5d1" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for a change application for a minor change to a development condition that a referral agency imposes—the referral agency; or</txt></block></li><li id="sec.78-ssec.3-para1.b" guid="_aee5b51b-17c5-4f66-a5af-dd6ec1d4aaff" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the P&#38;E Court, if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.78-ssec.3-para1.b-para2.i" guid="_8aa35a5d-61e6-4239-852e-e65222e69060" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the change application is for a minor change; and</txt></block></li><li id="sec.78-ssec.3-para1.b-para2.ii" guid="_c034a07b-aa7d-4816-b424-7f79ac7a2a0c" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the development approval was given because of an order of the court; and</txt></block></li><li id="sec.78-ssec.3-para1.b-para2.iii" guid="_2e49f1f3-a3d3-4bfd-a1ac-d4b746fd314e" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">there were any properly made submissions for the development application; or</txt></block></li></list></block></li><li id="sec.78-ssec.3-para1.c" guid="_edc62fbd-f5c8-4e5b-9111-ca0cb4625e9a" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">otherwise—the assessment manager.</txt></block></li></list></block></subclause><subclause id="sec.78-ssec.4" guid="_d8473f66-cea6-411e-8725-0f78578156fc" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">If the P&#38;E Court is the responsible entity, the court—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.78-ssec.4-para1.a" guid="_8ef6fc3a-6524-4c07-9ce8-6b200c2f31c6" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">must assess and decide the change application as required under this subdivision; but</txt></block></li><li id="sec.78-ssec.4-para1.b" guid="_762496dd-e843-4606-929b-756626818bcc" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">is not otherwise bound by the process under this subdivision.</txt></block></li></list></block></subclause></clause><clause id="sec.79" guid="_7f2b4c05-bd31-42fe-8ccf-5d5b153fd165" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>79</no><heading id="sec.79-he" guid="_10c24190-ba8f-407c-9801-4ad1b0a02c98">Requirements for change applications</heading><subclause id="sec.79-ssec.1" guid="_506a0c0c-92d6-45d6-9fcb-5ec403347774" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A change application must be—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.79-ssec.1-para1.a" guid="_337637a0-44ab-4d67-98dd-51b32ce96bec" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">made—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.79-ssec.1-para1.a-para2.i" guid="_994eb24a-b4df-48fe-a9b4-b5173bee87ce" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">if the responsible entity has a form for the application—in the form; or</txt></block></li><li id="sec.79-ssec.1-para1.a-para2.ii" guid="_e811d541-6f21-4702-bd49-ea92d63549b3" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">by notice; and</txt></block></li></list></block></li><li id="sec.79-ssec.1-para1.b" guid="_e128faf5-d02b-468f-a711-36bc654ab3b2" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">accompanied by—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.79-ssec.1-para1.b-para2.i" guid="_c64ff5dd-c71b-4db9-8754-63453d76cd14" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the required fee; and</txt></block></li><li id="sec.79-ssec.1-para1.b-para2.ii" guid="_f07e09bd-1fd0-4b3b-bfb6-053301a76861" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">for an application for a minor change—a copy of any pre-request response notice for the application; and</txt></block></li><li id="sec.79-ssec.1-para1.b-para2.iii" guid="_b511d9a4-c8ab-441a-9a0e-c2331ca20b2c" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">to the extent the application relates to premises, other than excluded premises, of which the applicant is not the owner—the written consent of the owner of the premises to the change application.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.79-ssec.2" guid="_d3d2b65d-efd4-4931-8ab1-3c738921a5bc" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The responsible entity—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.79-ssec.2-para1.a" guid="_9aad1655-ddd3-46f2-9308-d1cc60e12aa7" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">must accept an application that the responsible entity is satisfied complies with subsection (1); and</txt></block></li><li id="sec.79-ssec.2-para1.b" guid="_83c53836-3772-4a74-88ed-d00d08c2cebe" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">must not accept an application unless the responsible entity is satisfied the application complies with subsection (1)(b)(iii); and</txt></block></li><li id="sec.79-ssec.2-para1.c" guid="_2fd9819e-ed34-485b-b5d8-86878e08fa3c" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">may accept an application that does not comply with subsection (1)(a) or (b)(ii); and</txt></block></li><li id="sec.79-ssec.2-para1.d" guid="_e7e55fbf-78f1-4fb9-926d-13e47a189311" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">may accept an application that does not comply with subsection (1)(b)(i) to the extent the required fee has been waived under section 109(b).</txt></block></li></list></block></subclause></clause><clause id="sec.80" guid="_e26daddf-7ac9-476e-9722-397e3bc21f82" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>80</no><heading id="sec.80-he" guid="_f15f2939-fb2f-406c-bd17-9af384d00c00">Notifying affected entities of minor change application</heading><subclause id="sec.80-ssec.1" guid="_18814054-5e01-40b1-896e-54fb5b946a53" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">Anyone who proposes to make a change application for a minor change must give notice of the proposal and the details of the change to each affected entity.</txt></block></subclause><subclause id="sec.80-ssec.2" guid="_580cf2a0-a969-4959-bdf6-47ae7efd45d4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">An <defterm id="sec.80-def.affectedentity" guid="_8384a1ac-abbc-45bc-9b9f-c512ab9a40ed" type="definition">affected entity</defterm> is—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.80-ssec.2-para1.a" guid="_77ffbdaa-368f-4f05-9feb-7755c1800d6a" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if the responsible entity would be the assessment manager—a referral agency for the development application other than the chief executive; or</txt></block></li><li id="sec.80-ssec.2-para1.b" guid="_7b28ee16-24c2-4221-9ae6-a33551f30975" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the responsible entity would be a referral agency—the assessment manager, and any other referral agencies for the development application, other than the chief executive; or</txt></block></li><li id="sec.80-ssec.2-para1.c" guid="_97c3937a-54a3-4bd3-aa76-e9a5c9eb890d" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">if the responsible entity would be the P&#38;E Court—the assessment manager, and any referral agencies for the development application, other than the chief executive; or</txt></block></li><li id="sec.80-ssec.2-para1.d" guid="_e139495e-db85-4157-8d44-a1c08b8a7e6a" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">another person prescribed by regulation.</txt></block></li></list></block></subclause><subclause id="sec.80-ssec.3" guid="_ed510256-0156-4a36-9d83-417692318d53" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The affected entity may give the person who proposes to make the change application a notice (a <defterm id="sec.80-def.prerequestresponsenotice" guid="_310f0942-a651-47ed-bd17-049e3fbc00e5" type="definition">pre-request response notice</defterm>) that states—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.80-ssec.3-para1.a" guid="_7c6fc67b-3d42-44d8-b52f-7fc9a724a6a3" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">whether the affected entity objects to the change; and</txt></block></li><li id="sec.80-ssec.3-para1.b" guid="_82bb8d21-b8e9-442c-a932-f44bd47dce3c" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the reasons for any objection.</txt></block></li></list></block></subclause><subclause id="sec.80-ssec.4" guid="_9147d9c7-b3f0-47b8-a183-810508c6e877" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">If the applicant for a change application for a minor change has not received a pre-request response notice from an affected entity, the applicant must give a copy of the application to the affected entity as soon as practicable after the applicant gives the application to the responsible entity.</txt></block></subclause><subclause id="sec.80-ssec.5" guid="_6679451e-2932-43a6-a3a3-6139f78ef7a3" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">An affected entity must, within 15 business days after receiving a copy of a change application for a minor change, give the responsible entity and the applicant a notice (a <defterm id="sec.80-def.responsenotice" guid="_b64536be-f840-403c-bb8a-e4bd01caa007" type="definition">response notice</defterm>) that states—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.80-ssec.5-para1.a" guid="_ce30f042-41eb-4f57-88dc-3cd55f78bbe4" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the affected entity has no objection to the change; or</txt></block></li><li id="sec.80-ssec.5-para1.b" guid="_2367185a-3d1d-4423-8bab-392ecee8bece" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the affected entity objects to the change and the reasons for the objection.</txt></block></li></list></block></subclause><subclause id="sec.80-ssec.6" guid="_10dad5ac-d334-4d65-813f-0f5dd6a443ba" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">If the affected entity does not do so, the responsible entity must decide the application as if the affected entity had given a response notice stating the affected entity had no objection to the change.</txt></block></subclause></clause><clause id="sec.81" guid="_61f73d28-71cf-47d5-9fa7-0e8b930542f5" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>81</no><heading id="sec.81-he" guid="_519c04af-7bcb-447f-badc-3dd457b17961">Assessing and deciding application for minor changes</heading><subclause id="sec.81-ssec.1" guid="_5424154d-abc0-400c-ac8e-a982ef47011b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to a change application for a minor change to a development approval.</txt></block></subclause><subclause id="sec.81-ssec.2" guid="_570337b7-463d-4d81-b7bd-e604c1cdd298" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">When assessing the change application, the responsible entity must consider—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.81-ssec.2-para1.a" guid="_63038674-dc48-4d41-9272-a9af53557d96" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the information the applicant included with the application; and</txt></block></li><li id="sec.81-ssec.2-para1.b" guid="_d0ed8ad2-0132-42eb-b8b2-9f2abae6c5ff" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the responsible entity is the assessment manager and submissions were properly made about the development application—the submissions; and</txt></block></li><li id="sec.81-ssec.2-para1.c" guid="_27320c47-eeb1-4e24-90d5-f552fd9b4c5b" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">any pre-request response notice or response notice given in relation to the change application; and</txt></block></li><li id="sec.81-ssec.2-para1.d" guid="_2cdf6b70-51a3-46a7-8e19-e324457c63b4" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">all matters the responsible entity would or may assess against or have regard to, if the change application were a development application; and</txt></block></li><li id="sec.81-ssec.2-para1.e" guid="_fb257bc1-8cd4-42b0-a483-8dc460433da3" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">another matter that the responsible entity considers relevant.</txt></block></li></list></block></subclause><subclause id="sec.81-ssec.3" guid="_8259a7d8-1eca-477d-b9e9-63f7b802bf90" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">For subsection (2)(d), the responsible entity—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.81-ssec.3-para1.a" guid="_01369c5f-1672-4660-837e-d44be97c30bd" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">must assess against, or have regard to, the matters that applied when the development application was made; and</txt></block></li><li id="sec.81-ssec.3-para1.b" guid="_1ece6bbb-1930-4962-9cc1-b07b90034bf8" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">may assess against, or have regard to, the matters that applied when the change application was made.</txt></block></li></list></block></subclause><subclause id="sec.81-ssec.4" guid="_ba13feca-0f59-436d-b593-5293170d9673" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">After assessing the change application, the responsible entity must decide to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.81-ssec.4-para1.a" guid="_e244a29b-8938-4593-9bde-6e3221f6a41c" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">make the change, with or without imposing development conditions, or amending development conditions, relating to the change; or</txt></block></li><li id="sec.81-ssec.4-para1.b" guid="_5ff97aac-a919-434c-90a6-264e55eb341a" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">refuse to make the change.</txt></block></li></list></block></subclause><subclause id="sec.81-ssec.5" guid="_bcc5ea24-2714-4c34-944e-8045d689770f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">If there is no affected entity, the responsible entity must decide the application within 20 business days after receiving the application.</txt></block></subclause><subclause id="sec.81-ssec.6" guid="_000bba9e-d55c-440a-857c-9987e8599408" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">If there is an affected entity, the responsible entity—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.81-ssec.6-para1.a" guid="_9f10b4c0-4077-46ed-8b83-f5ba168d3dd1" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">must not decide the application until—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.81-ssec.6-para1.a-para2.i" guid="_960bb5c5-a2c4-4513-b570-723c6225f538" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the responsible entity receives a pre-request response notice, or response notice, from each affected entity; or</txt></block></li><li id="sec.81-ssec.6-para1.a-para2.ii" guid="_80773a97-2310-4302-bc1d-b882ef382691" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the end of 20 business days after the responsible entity received the application; but</txt></block></li></list></block></li><li id="sec.81-ssec.6-para1.b" guid="_b908b629-e998-47a7-861b-8828d938bf10" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">must decide the application within 25 business days after receiving the application.</txt></block></li></list></block></subclause><subclause id="sec.81-ssec.7" guid="_2b33555d-f49b-4edf-a6a2-6e1c57d60a4c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">However, the responsible entity and the applicant may, within the period stated in subsection (5) or (6)(b), agree to extend the period.</txt></block></subclause></clause><clause id="sec.82" guid="_88c6c953-2090-4e10-b41b-715f2c7136dc" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>82</no><heading id="sec.82-he" guid="_d2ab009b-b014-49f9-b3c0-9104fe83e416">Assessing and deciding application for other changes</heading><subclause id="sec.82-ssec.1" guid="_a9d44748-73bd-43e9-9b31-17daa3a1b945" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to a change application, other than for a minor change to a development approval.</txt></block></subclause><subclause id="sec.82-ssec.2" guid="_da419715-6d04-4a85-b671-9699e5d1f860" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">For administering the change application, and assessing and deciding the change application in the context of the development approval, part 2, division 2 and part 3, other than sections 51, 63 and 64(8)(c), and the development assessment rules, apply—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.82-ssec.2-para1.a" guid="_b24e15df-80e1-465d-b6dc-ce77974ca3f1" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">as if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.82-ssec.2-para1.a-para2.i" guid="_99ca8059-f4d6-4b3a-ac13-09a6489fceb4" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the responsible entity were the assessment manager; and</txt></block></li><li id="sec.82-ssec.2-para1.a-para2.ii" guid="_8a0ee025-7049-47fc-b44a-eb92b056f03e" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the change application were the original development application, with the changes included, but was made when the change application was made; and</txt></block></li></list></block></li><li id="sec.82-ssec.2-para1.b" guid="_a20de085-8d2f-4681-a3bd-2557b05a0cb5" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">with necessary changes.</txt></block></li></list></block></subclause><subclause id="sec.82-ssec.3" guid="_38192f1f-5304-4242-9248-d8566696eeb8" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">However—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.82-ssec.3-para1.a" guid="_0ff4358e-cbb4-41fb-a291-0cd0554c4611" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">section 53 does not apply to the change application if the change is not a minor change only because the change may cause—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.82-ssec.3-para1.a-para2.i" guid="_5bdf9d59-e925-429e-b3ac-6105994ff010" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a referral to a referral agency if there were no referral agencies for the development application; or</txt></block></li><li id="sec.82-ssec.3-para1.a-para2.ii" guid="_44013903-d658-41a8-a969-9e32a5ebc2c3" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">a referral to extra referral agencies; or</txt></block></li><li id="sec.82-ssec.3-para1.a-para2.iii" guid="_86339b12-879e-458e-b0ab-da1caf6f3c23" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">a referral agency to assess the change application against extra matters; and</txt></block></li></list></block></li><li id="sec.82-ssec.3-para1.b" guid="_e134c02e-a87c-42ce-b9e0-215be5e636e1" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the power—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.82-ssec.3-para1.b-para2.i" guid="_d1989b99-36a1-46d2-913c-7fd1c2348df1" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">to direct that a development condition be imposed under section 56(1)(b)(i) includes a power to direct that a development condition be amended; and</txt></block></li><li id="sec.82-ssec.3-para1.b-para2.ii" guid="_248968fa-033c-4436-b8d0-d1bbcfc1c0ea" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">to impose a development condition under section 60(2)(c) or (3)(b) or 64(6)(b) includes a power to amend a development condition.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.82-ssec.4" guid="_a70420f2-425f-41e0-a665-cf5effa1fedc" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">To remove any doubt, it is declared that the following matters apply, only to the extent the matters are relevant to assessing and deciding the change application in the context of the development approval—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.82-ssec.4-para1.a" guid="_568d7497-5b5c-4756-b162-97bc831ba0d5" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the assessment benchmarks;</txt></block></li><li id="sec.82-ssec.4-para1.b" guid="_634e88c4-a0b9-4946-ad74-aa7299ce1ec8" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">any matters a referral agency must, may, or may only assess the application against or have regard to under section 55(2);</txt></block></li><li id="sec.82-ssec.4-para1.c" guid="_fed4da8b-17d4-4ee2-9eba-3181441b1a9a" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">any matters the assessment must have regard to under section 45(3) or (5);</txt></block></li><li id="sec.82-ssec.4-para1.d" guid="_9095a5a1-4385-4d16-b40d-f04059fb5fbc" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">any other relevant matters under section 45(5)(b).</txt></block></li></list></block></subclause></clause></subdivision><subdivision id="ch.3-pt.5-div.2-sdiv.3" guid="_770fe8bd-697e-428b-b05a-64a4df6955aa" status="uncommenced" affected.by.uncommenced="0"><no>Subdivision 3</no><heading id="ch.3-pt.5-div.2-sdiv.3-he" guid="_3e13b55e-dd9d-488d-b4e1-8acf14f2c08a">Notice of decision</heading><clause id="sec.83" guid="_6ea75a16-e42f-4d55-bf99-eb7d7ebdb472" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>83</no><heading id="sec.83-he" guid="_7e7e5dd8-7f2d-4f86-b3b1-4c27f166a4be">Notice of decision</heading><subclause id="sec.83-ssec.1" guid="_f9105b83-1a1c-4df4-b2ed-eb3e8a6cfa58" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The responsible entity, other than the P&#38;E Court, must give a decision notice about the entity’s decision on a change application, within 5 business days after deciding the application, to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.83-ssec.1-para1.a" guid="_e053a6ec-bd6d-41e1-8c51-5d4d120b0090" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the applicant; and</txt></block></li><li id="sec.83-ssec.1-para1.b" guid="_8ecc758c-6235-4ae2-be36-fbcf01482c65" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the responsible entity is not the assessment manager—the assessment manager; and</txt></block></li><li id="sec.83-ssec.1-para1.c" guid="_148c15a9-a444-4ea6-b01c-ee460b04ba93" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">if the responsible entity is a chosen assessment manager—the prescribed assessment manager; and</txt></block></li><li id="sec.83-ssec.1-para1.d" guid="_c9bb53b4-b387-44de-8a05-b63d6b5287f1" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">any referral agency for the application; and</txt></block></li><li id="sec.83-ssec.1-para1.e" guid="_1870ba13-83e2-4494-acc0-b21429ec28ca" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">if the responsible entity is not a local government and the premises are in a local government area—the local government whose local government area includes the premises; and</txt></block></li><li id="sec.83-ssec.1-para1.f" guid="_b7a1b856-02cd-472a-b0ef-bf29d1d913aa" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">if the application relates to a development approval given after the application for the development approval was called in—the Minister that called in the application; and</txt></block></li><li id="sec.83-ssec.1-para1.g" guid="_83bc7c75-e7ab-4322-bb02-a4567c31cd40" status="uncommenced" provision.type="other"><no>(g)</no><block status="uncommenced"><txt break.before="1">if the approval was given under a court order and the court was not the responsible entity—the court.</txt></block></li></list></block></subclause><subclause id="sec.83-ssec.2" guid="_338b586d-dfd4-48b9-a164-b58fc1d3f436" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The decision notice must state the day when—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.83-ssec.2-para1.a" guid="_9e847640-80d2-4cd9-88dc-48e82b68d0e1" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the change application was made; and</txt></block></li><li id="sec.83-ssec.2-para1.b" guid="_db842a99-d8f2-4aaa-988c-ba6766b50e56" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the development approval for the development application was decided.</txt></block></li></list></block></subclause><subclause id="sec.83-ssec.3" guid="_bc265b01-e13a-4e90-885c-ed9416a55a87" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">If the decision is to make the change, the decision notice must be accompanied by a copy of the following showing the change, including any extra development conditions—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.83-ssec.3-para1.a" guid="_b6a2c539-2a15-4573-94c3-dba6bdeb524f" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if the responsible entity is a referral agency—the referral agency’s response for the original development application;</txt></block></li><li id="sec.83-ssec.3-para1.b" guid="_25c792ca-e75d-4a2b-bced-bdb95b36c0ce" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">otherwise—the development approval.</txt></block></li></list></block></subclause><subclause id="sec.83-ssec.4" guid="_2dae0c47-a1bd-43c3-b457-b726a2a0727b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">If a decision notice is given to a court, the court must attach the notice to the court’s file for the court order.</txt></block></subclause><subclause id="sec.83-ssec.5" guid="_0ba4e6a8-c78f-4096-a556-d2825c34cfa7" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">If the decision notice is given by the court, the decision starts to have effect when the notice is given.</txt></block></subclause><subclause id="sec.83-ssec.6" guid="_4d240f70-7fde-4474-a10c-2fd9d20e282f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">If subsection (5) does not apply, section 71(1) to (6) applies to the decision notice as if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.83-ssec.6-para1.a" guid="_6ac9aa48-3f32-40fb-8604-dad92727358e" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the decision were a development approval; and</txt></block></li><li id="sec.83-ssec.6-para1.b" guid="_f44a5eea-0456-4833-8585-0616bfea2b6d" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a submitter for the change application were a submitter for a development application; and</txt></block></li><li id="sec.83-ssec.6-para1.c" guid="_d1889f3b-80bb-4ae5-a787-227bf9d6b400" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">an affected entity, or an advice agency in relation to the change application, were an advice agency mentioned in section 71; and</txt></block></li><li id="sec.83-ssec.6-para1.d" guid="_3049ba1c-b431-474c-b6c6-6b755875e5b4" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">the applicant for the change application were an applicant for a development approval; and</txt></block></li><li id="sec.83-ssec.6-para1.e" guid="_13074df0-e0f0-46a5-868f-bf8c3b09f7bf" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">the responsible entity were an assessment manager.</txt></block></li></list></block></subclause><subclause id="sec.83-ssec.7" guid="_43db1541-5e94-4e66-9410-ff096efa1ce9" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">If—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.83-ssec.7-para1.a" guid="_3c3b70a8-4c65-4129-abf6-ff2394b80a30" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the responsible entity for a change application, other than for a minor change, is—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.83-ssec.7-para1.a-para2.i" guid="_7fd2dc66-7feb-4b4f-a715-e374ad7452e9" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a local government; or</txt></block></li><li id="sec.83-ssec.7-para1.a-para2.ii" guid="_3da261f4-6705-4c1a-bccf-3c5abd9830c4" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the chief executive; or</txt></block></li><li id="sec.83-ssec.7-para1.a-para2.iii" guid="_8f74c431-600c-4ca6-9739-5831320993ff" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">an entity prescribed by regulation; and</txt></block></li></list></block></li><li id="sec.83-ssec.7-para1.b" guid="_e9ff2b16-89f5-4cc4-96ae-da5d76b6d906" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the change application involved—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.83-ssec.7-para1.b-para2.i" guid="_05b80c34-e3a9-4bb9-9d3c-28693d8ea552" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a material change of use; or</txt></block></li><li id="sec.83-ssec.7-para1.b-para2.ii" guid="_862b48af-1d21-4483-9fcf-02a3f096dee1" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">reconfiguring a lot; or</txt></block></li><li id="sec.83-ssec.7-para1.b-para2.iii" guid="_f12a0602-f5fc-4492-8d13-90c524e10802" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">building work, other than to the extent the building work is assessable against the building assessment provisions; or</txt></block></li><li id="sec.83-ssec.7-para1.b-para2.iv" guid="_3c1a6fe4-61be-4742-aca0-b4ddd488a2b4" status="uncommenced" provision.type="other"><no>(iv)</no><block status="uncommenced"><txt break.before="1">development prescribed by regulation;</txt></block></li></list></block></li></list><txt break.before="1">the responsible entity must publish a notice about the decision on the responsible entity’s website.</txt></block></subclause><subclause id="sec.83-ssec.8" guid="_d6bcb0ba-e8b9-4369-93fe-93c0b849f8f5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(8)</no><block status="uncommenced"><txt break.before="1">The notice must state—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.83-ssec.8-para1.a" guid="_10f648b5-ae68-498f-b865-56d6cb0fa646" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a description of the development; and</txt></block></li><li id="sec.83-ssec.8-para1.b" guid="_b8f4eeff-73ff-4655-a21f-88bf4af35b75" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a description of any assessment benchmarks, or matters under section 55(2), applying for assessing the change application; and</txt></block></li><li id="sec.83-ssec.8-para1.c" guid="_90308063-0aca-4c7e-be20-2741913e2ee1" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">to the extent the change application required impact assessment—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.83-ssec.8-para1.c-para2.i" guid="_f7eb68ba-8ddb-441b-af50-5a14155fc223" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">any relevant matters under section 45(5)(b) that the development was assessed against, or to which regard was had, in the assessment; and</txt></block></li><li id="sec.83-ssec.8-para1.c-para2.ii" guid="_491ac41a-3d49-401a-8df0-6e02f1516166" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">a description of the matters raised in any submissions; and</txt></block></li><li id="sec.83-ssec.8-para1.c-para2.iii" guid="_e37f01c5-b43a-4607-bf0f-c87794bc0e91" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">how the assessment manager dealt with the matters described under subparagraph (ii) in reaching a decision; and</txt></block></li></list></block></li><li id="sec.83-ssec.8-para1.d" guid="_cb009b88-d04f-4db7-bb8e-3b57f37e3428" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">the reasons for the responsible entity’s decision; and</txt></block></li><li id="sec.83-ssec.8-para1.e" guid="_37ef7b11-2e21-48da-b48c-6da37a3752eb" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">the reasons why the change application was approved despite the development not complying with any or all of the benchmarks, if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.83-ssec.8-para1.e-para2.i" guid="_6839ebdf-2733-42f8-b163-1dbedf95d254" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the responsible entity was the assessment manager; and</txt></block></li><li id="sec.83-ssec.8-para1.e-para2.ii" guid="_7ebea471-bf68-40ff-bf43-0a63ec6a55a4" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the development did not comply with any or all of the benchmarks; and</txt></block></li><li id="sec.83-ssec.8-para1.e-para2.iii" guid="_fcdd0b95-1151-44ae-b9c3-a0528cde2ae6" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">the responsible entity approved the change application, or approved the change application subject to conditions; and</txt></block></li></list></block></li><li id="sec.83-ssec.8-para1.f" guid="_6ead59b8-6276-4b30-bcaa-4afa914cb8f5" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">any matter prescribed by a regulation.</txt></block></li></list></block></subclause></clause></subdivision></division><division id="ch.3-pt.5-div.3" guid="_2e6cd1f6-aa07-4bdd-80e7-373bf38604e5" status="uncommenced" affected.by.uncommenced="0"><no>Division 3</no><heading id="ch.3-pt.5-div.3-he" guid="_f4527079-214e-43b8-83b1-97c3eda999b0">Cancelling development approvals</heading><clause id="sec.84" guid="_62e5d58d-415a-4944-86c2-b0c92fb2ce7a" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>84</no><heading id="sec.84-he" guid="_606e9a8f-362a-420d-b0be-129a3bf390b0">Cancellation applications</heading><subclause id="sec.84-ssec.1" guid="_5779343d-89d7-424b-aa67-3f64f37b157a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A person may make an application (a <defterm id="sec.84-def.cancellationapplication" guid="_64e85652-75d6-4800-ad66-f0f1ff96feec" type="definition">cancellation application</defterm>) to cancel a development approval, unless—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.84-ssec.1-para1.a" guid="_0ba55150-8c06-4fbe-a5d0-44dd70d900ad" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the development has started; and</txt></block></li><li id="sec.84-ssec.1-para1.b" guid="_76de5ea7-a276-4002-afc6-40980583dee0" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">there are unfulfilled or ongoing obligations under the approval relating to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.84-ssec.1-para1.b-para2.i" guid="_7cdbb37a-2673-4556-8379-4f354f8512f6" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the development already carried out; or</txt></block></li><li id="sec.84-ssec.1-para1.b-para2.ii" guid="_03c8043c-11cb-420d-b8a3-e6c9a23f22d4" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the conduct or management of uses started, or works carried out, under the approval; and</txt></block></li></list><note id="sec.84-ssec.1-para1.b-note" guid="_4ceb92a9-abea-4a69-a4a2-1d640e8fa9ba" type="example"><heading id="sec.84-ssec.1-para1.b-note-he" guid="_100c6799-d55b-4433-9b42-d5e7ee10338e">Examples of paragraph (b)—</heading><block status="uncommenced"><txt break.before="1">An obligation under a development condition about—</txt><list number.type="bull" unnumbered.indent="0"><li id="sec.84-ssec.1-para1.b-note-para2" guid="_84c65223-25ba-41b6-8d63-8d9a654685d5" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">operating hours, traffic management or waste management</txt></block></li><li id="sec.84-ssec.1-para1.b-note-para2-oc.2" guid="_704927a7-22b9-4398-a9da-b806a37fdbce" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">restoring or rehabilitating the land or a building</txt></block></li></list></block></note></block></li><li id="sec.84-ssec.1-para1.c" guid="_5b53e9af-9252-4b21-8ba5-dff561c77c74" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the obligations have not been superseded under another development approval, or authority, under this or another Act.</txt></block></li></list></block></subclause><subclause id="sec.84-ssec.2" guid="_b1427e9c-22b6-4ed6-bbc3-0c7db9a5008d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">A cancellation application must be made to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.84-ssec.2-para1.a" guid="_59a63672-8728-49dd-a696-ea76cd9a397e" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for a development application that was called in—the original assessment manager; or</txt></block></li><li id="sec.84-ssec.2-para1.b" guid="_c2476640-cc7d-4a9d-87dd-1f13fb044732" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">otherwise—the assessment manager.</txt></block></li></list></block></subclause><subclause id="sec.84-ssec.3" guid="_6a8d230a-2558-4a1d-85c9-87974c8c49eb" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The application must be accompanied by—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.84-ssec.3-para1.a" guid="_a15d93cf-988e-4733-8e34-b82fb2552767" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the required fee, subject to section 109(b); and</txt></block></li><li id="sec.84-ssec.3-para1.b" guid="_58e1f863-1537-430c-803f-7ecd2172eb60" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the written consent of—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.84-ssec.3-para1.b-para2.i" guid="_d06b99af-6c5e-496a-b035-18ba1d2c64ce" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">if the applicant is not the owner of the premises—the owner of the premises; and</txt></block></li><li id="sec.84-ssec.3-para1.b-para2.ii" guid="_6f7cf03c-1b52-4965-8aad-89896de30d5b" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">if there is an agreement for a person to buy the premises from the owner of the premises—the other person; and</txt></block></li><li id="sec.84-ssec.3-para1.b-para2.iii" guid="_3cf77db3-d90c-4041-8529-b85265b46b4b" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">if the premises are subject to an easement in favour of a public utility—the public utility.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.84-ssec.4" guid="_852a8fdc-2a89-47ff-aa6d-8b56909800c9" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">On receiving an application that complies with this section, the assessment manager must—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.84-ssec.4-para1.a" guid="_5746781f-fce3-40b8-826d-006f9987494b" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">cancel the development approval; and</txt></block></li><li id="sec.84-ssec.4-para1.b" guid="_32cfacfd-abc6-4cbc-82ad-3c34df0f780b" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">give notice of the cancellation to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.84-ssec.4-para1.b-para2.i" guid="_e369d747-6d67-488b-ad35-200446a476b2" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the applicant; and</txt></block></li><li id="sec.84-ssec.4-para1.b-para2.ii" guid="_b352308e-86dc-47a8-8246-202031eb46c1" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">each referral agency; and</txt></block></li><li id="sec.84-ssec.4-para1.b-para2.iii" guid="_d3b4dbb6-e36c-4a2f-b6d9-65b5aee931a1" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">if the assessment manager was a chosen assessment manager—the prescribed assessment manager; and</txt></block></li><li id="sec.84-ssec.4-para1.b-para2.iv" guid="_cc1c3263-ea48-489d-aea5-6ce4104c560e" status="uncommenced" provision.type="other"><no>(iv)</no><block status="uncommenced"><txt break.before="1">for an approval given under an order of the P&#38;E Court—the court; and</txt></block></li><li id="sec.84-ssec.4-para1.b-para2.v" guid="_00ff3cac-8002-4a06-bd1c-65481d83f3ad" status="uncommenced" provision.type="other"><no>(v)</no><block status="uncommenced"><txt break.before="1">for an approval given under a call in—the Minister.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.84-ssec.5" guid="_06b7fdd9-eeea-430b-80d4-e99987bdffbc" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The assessment manager and any referral agency must release any monetary security for the development approval held by the assessment manager or referral agency.</txt></block></subclause></clause></division><division id="ch.3-pt.5-div.4" guid="_ec53eaa8-7b86-4100-a0e9-8d73a10e7014" status="uncommenced" affected.by.uncommenced="0"><no>Division 4</no><heading id="ch.3-pt.5-div.4-he" guid="_2c09e3a0-f64b-41df-b3e5-cbb052113e95">Lapsing of and extending development approvals</heading><clause id="sec.85" guid="_00ab4681-d08b-4a93-ad87-e19f6fb95bb1" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>85</no><heading id="sec.85-he" guid="_6e4447f5-db76-448c-bdc9-b06a5111ac5d">Lapsing of approval at end of currency period</heading><subclause id="sec.85-ssec.1" guid="_4dfdc0f6-393a-4d58-a522-329f272a5acd" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A part of a development approval lapses at the end of the following period (the <defterm id="sec.85-def.currencyperiod" guid="_5afcd42d-b072-4be4-9d85-d1927e6e7b28" type="definition">currency period</defterm>)—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.85-ssec.1-para1.a" guid="_15f4d7fd-937a-43b9-8668-7bed14527331" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for any part of the development approval relating to a material change of use—if the first change of use does not happen within—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.85-ssec.1-para1.a-para2.i" guid="_d89107c8-4228-4cf2-b74e-508cc4672379" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the period stated for that part of the approval; or</txt></block></li><li id="sec.85-ssec.1-para1.a-para2.ii" guid="_c4bb4fe5-b4b2-453e-ad85-9761080ecfde" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">if no period is stated—6 years after the approval starts to have effect;</txt></block></li></list></block></li><li id="sec.85-ssec.1-para1.b" guid="_27a60113-d443-4fdb-be89-4881e3c4097c" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for any part of the development approval relating to reconfiguring a lot—if a plan for the reconfiguration that, under the Land Title Act, is required to be given to a local government for approval is not given to the local government within—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.85-ssec.1-para1.b-para2.i" guid="_e47eedda-2388-4f43-a7fe-b937173f7ae1" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the period stated for that part of the approval; or</txt></block></li><li id="sec.85-ssec.1-para1.b-para2.ii" guid="_03b15ca8-05da-4393-97cf-73e57a31b913" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">if no period is stated—4 years after the approval starts to have effect;</txt></block></li></list></block></li><li id="sec.85-ssec.1-para1.c" guid="_a42ef1db-084c-4939-b1e2-ed1a2bdd7710" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">for any other part of the development approval—if the development does not substantially start within—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.85-ssec.1-para1.c-para2.i" guid="_30cf59cb-6927-4525-8bb9-07186a569512" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the period stated for that part of the approval; or</txt></block></li><li id="sec.85-ssec.1-para1.c-para2.ii" guid="_8553ad2d-70b9-4c59-98b6-713f998551f4" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">if no period is stated—2 years after the approval starts to take effect.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.85-ssec.2" guid="_b9804e06-0705-48c0-aa43-9d48626c6bbf" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">If part of a development approval lapses, any monetary security given for that part of the approval must be released.</txt></block></subclause></clause><clause id="sec.86" guid="_e36f5a19-bf95-4366-8c67-fe5458d73957" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>86</no><heading id="sec.86-he" guid="_698ddb9d-12ed-4329-bb91-4201f0cedafa">Extension applications</heading><subclause id="sec.86-ssec.1" guid="_23b140e2-bb77-490c-bde0-16b656956d5a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A person may make an application (an <defterm id="sec.86-def.extensionapplication" guid="_9fe8cada-0a9d-4b95-84c7-26a66ba5174a" type="definition">extension application</defterm>) to the assessment manager to extend a currency period of a development approval before the approval lapses.</txt></block></subclause><subclause id="sec.86-ssec.2" guid="_955e634e-251d-491c-904d-17d02bd10614" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The extension application must be—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.86-ssec.2-para1.a" guid="_069b7f58-752b-4f13-a4d0-a08ba2ab1204" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">made—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.86-ssec.2-para1.a-para2.i" guid="_13e5d991-6ec0-4f34-bf60-06e66353e926" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">if the assessment manager has a form for the application—in the form; or</txt></block></li><li id="sec.86-ssec.2-para1.a-para2.ii" guid="_a731bbb8-e129-4e34-8fdf-29cb021a33a2" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">by notice; and</txt></block></li></list></block></li><li id="sec.86-ssec.2-para1.b" guid="_c6ae10a6-2e7c-4604-92fc-51d26817eb2b" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">accompanied by—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.86-ssec.2-para1.b-para2.i" guid="_c65540af-6f03-4620-a248-2240855359ca" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the required fee; and</txt></block></li><li id="sec.86-ssec.2-para1.b-para2.ii" guid="_979be1f1-47cd-4e3f-8ef6-950e4234ad8d" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">to the extent the application relates to premises, other than excluded premises, for which the applicant is not the owner—the written consent of the owner of the premises to the application.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.86-ssec.3" guid="_4b16642b-d069-4950-81a4-06d2e477f300" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">An assessment manager—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.86-ssec.3-para1.a" guid="_8939cd03-a349-4772-980b-2e1da841c1cd" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">must accept an application that the assessment manager is satisfied complies with subsection (2); and</txt></block></li><li id="sec.86-ssec.3-para1.b" guid="_d6e21bbe-e6cb-426c-a488-ba787fb8680c" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">must not accept an application unless the assessment manager is satisfied the application complies with subsection (2)(b)(ii); and</txt></block></li><li id="sec.86-ssec.3-para1.c" guid="_efc491a8-7bc4-4c58-a5f4-ceed5369d04a" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">may accept an application that does not comply with subsection (2)(a); and</txt></block></li><li id="sec.86-ssec.3-para1.d" guid="_3b227f2d-47d9-47ef-ae6f-516b4debe8c5" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">may accept an application that does not comply with subsection (2)(b)(i) to the extent the required fee has been waived under section 109(b).</txt></block></li></list></block></subclause></clause><clause id="sec.87" guid="_10f70b2c-1fda-4b51-9db9-615593d6e4d2" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>87</no><heading id="sec.87-he" guid="_354cce0b-8677-4cef-b87a-df74ede54019">Assessing and deciding extension applications</heading><subclause id="sec.87-ssec.1" guid="_7782c46c-63da-4f0c-a87a-679af4592e4d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">When assessing an extension application, the assessment manager may consider any matter that the assessment manager considers relevant, even if the matter was not relevant to assessing the development application.</txt></block></subclause><subclause id="sec.87-ssec.2" guid="_6486bdf3-2afa-4230-a455-4878dbcdc749" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The assessment manager must, within 20 business days after receiving the extension application, decide whether to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.87-ssec.2-para1.a" guid="_4563dd55-c3ea-4615-8ad9-a78c0ae52b28" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">give or refuse the extension sought; or</txt></block></li><li id="sec.87-ssec.2-para1.b" guid="_f84fc466-b0e0-436a-afba-22e672bb78b9" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">extend the currency period for a period that is different from the extension sought.</txt></block></li></list></block></subclause><subclause id="sec.87-ssec.3" guid="_7e332679-c74e-4e4a-977b-c40d17010866" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The assessment manager and the applicant may agree to extend the 20 business day period.</txt></block></subclause><subclause id="sec.87-ssec.4" guid="_558f79fc-4f11-4fb0-84ec-5d026c89f798" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The assessment manager may decide the extension application even if the development approval was given because of an order of the P&#38;E Court.</txt></block></subclause><subclause id="sec.87-ssec.5" guid="_ac063e0f-46ee-4c85-9a83-0f48ce975e1e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The assessment manager must, within 5 business days after deciding the extension application, give a decision notice to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.87-ssec.5-para1.a" guid="_d5ddf125-f3f5-41ce-a30e-66a054112aa7" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the applicant; and</txt></block></li><li id="sec.87-ssec.5-para1.b" guid="_7cb215fe-3aa4-4740-bcb5-0609274945a1" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">any referral agency; and</txt></block></li><li id="sec.87-ssec.5-para1.c" guid="_090e87d0-88c8-4677-9439-e42de3b83745" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">if the assessment manager was a chosen assessment manager—the prescribed assessment manager; and</txt></block></li><li id="sec.87-ssec.5-para1.d" guid="_221022c8-3bda-473a-b2c5-ecaa6bd5eb0a" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">if the assessment manager is not a local government and the premises are in a local government area—the local government whose local government area includes the premises; and</txt></block></li><li id="sec.87-ssec.5-para1.e" guid="_7470cc11-596d-4872-a389-5ceed1aceb0c" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">if the development approval was given because of an order of the P&#38;E Court—the P&#38;E Court; and</txt></block></li><li id="sec.87-ssec.5-para1.f" guid="_1ec3f35f-1ce5-4d14-8b60-be58868c5612" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">if the development application for the development approval was called in—the Minister.</txt></block></li></list></block></subclause><subclause id="sec.87-ssec.6" guid="_a57d9153-2b01-4848-85ed-22c90909513a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">If a decision notice is given to the P&#38;E Court, the P&#38;E Court must attach the notice to the court’s file for the court’s order.</txt></block></subclause><subclause id="sec.87-ssec.7" guid="_946033bc-799d-44e0-89cd-141b1c0f29e2" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">Despite section 85, the development approval lapses—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.87-ssec.7-para1.a" guid="_43b2b3c1-0829-4913-a0e1-2498f3a57038" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if the extension application is approved—at the end of the extended period; or</txt></block></li><li id="sec.87-ssec.7-para1.b" guid="_0080b68b-edf9-493b-9f01-51ac1c1e9b3f" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the extension application is refused and the applicant does not appeal—when the last of the following happens—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.87-ssec.7-para1.b-para2.i" guid="_a67a409d-6fb8-431c-96a4-6b89331a906d" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the day notice is given under subsection (5);</txt></block></li><li id="sec.87-ssec.7-para1.b-para2.ii" guid="_347594ff-4747-4ead-81ef-40c956351a59" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the end of the currency period; or</txt></block></li></list></block></li><li id="sec.87-ssec.7-para1.c" guid="_c12df19b-606d-415b-a580-a3d1a5acdee5" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">if the extension application is refused, the applicant does appeal and the appeal is dismissed or withdrawn—when the last of the following happens—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.87-ssec.7-para1.c-para2.i" guid="_b4519c92-945a-4539-96f4-d9b70f4f1395" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the day the appeal is dismissed or withdrawn;</txt></block></li><li id="sec.87-ssec.7-para1.c-para2.ii" guid="_97984021-a8e2-43be-9a06-37b1a2cabe5e" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the end of the currency period; or</txt></block></li></list></block></li><li id="sec.87-ssec.7-para1.d" guid="_77b4e04d-3dd1-4ca5-b2c2-4d4283a12842" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">if the extension application is refused, the applicant does appeal, and the appeal is allowed—at the end of the extended period decided by the court.</txt></block></li></list></block></subclause><subclause id="sec.87-ssec.8" guid="_e807cd4a-af7c-45f8-a97e-fc491fb3230e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(8)</no><block status="uncommenced"><txt break.before="1">If the applicant does appeal, the applicant may not start or carry on development until the appeal is decided, unless allowed by an order of the P&#38;E Court.</txt></block></subclause></clause><clause id="sec.88" guid="_dd226378-cbf9-412c-83ca-f88a6cb75077" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>88</no><heading id="sec.88-he" guid="_5fc3703f-4907-4414-9250-964a777cc9e4">Lapsing of approval for failing to complete development</heading><subclause id="sec.88-ssec.1" guid="_c252a4aa-83a8-4a30-b875-34b9e95bde9f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A development approval, other than a variation approval, for development lapses to the extent the development is not completed within any period or periods required under a development condition.</txt></block></subclause><subclause id="sec.88-ssec.2" guid="_e807a926-35d8-49b7-8b6f-661f2cb89a8b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">A variation approval for development lapses to the extent the development is not completed within—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.88-ssec.2-para1.a" guid="_eaeba89e-517e-4c32-982d-ea8161582b63" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if a development condition required the development to be completed within a stated period or periods—the stated period or periods; or</txt></block></li><li id="sec.88-ssec.2-para1.b" guid="_1f11225f-d4b0-42dc-b0e4-ce89e1aa4d63" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if paragraph (a) does not apply—the period or periods the applicant nominated in the development application; or</txt></block></li><li id="sec.88-ssec.2-para1.c" guid="_9b019e9b-ab9c-485f-8813-f3a7e8ab3a5a" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">otherwise—5 years after the approval starts to have effect.</txt></block></li></list></block></subclause><subclause id="sec.88-ssec.3" guid="_40ac26c1-b7a8-4a28-afe2-0e34bebbe386" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">However, despite the lapsing of the development approval, any security paid under a condition stated in section 65(2)(e) may be used as stated in the approval or agreement under section 67 (to finish the development, for example).</txt></block></subclause></clause></division><division id="ch.3-pt.5-div.5" guid="_38ba6213-5c0c-4fda-bd5e-7f032b6c3f8e" status="uncommenced" affected.by.uncommenced="0"><no>Division 5</no><heading id="ch.3-pt.5-div.5-he" guid="_0e0582f3-368a-478d-ab95-2a03e673c888">Noting development approvals on planning scheme</heading><clause id="sec.89" guid="_a91aaa8d-baca-41aa-8bae-b10fce4d02dc" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>89</no><heading id="sec.89-he" guid="_c292e224-5fc2-4fa6-8579-cc7417234b7d">Particular approvals to be noted</heading><subclause id="sec.89-ssec.1" guid="_ac10a97b-27c5-4240-b076-41ba98f8874b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if a local government—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.89-ssec.1-para1.a" guid="_799f732d-9c9a-4711-a6db-ea4b5d1e50d5" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">considers a development approval is substantially inconsistent with its planning scheme; or</txt></block></li><li id="sec.89-ssec.1-para1.b" guid="_41496929-9d9d-40ea-9b09-b4a29d7c17de" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">gives a variation approval; or</txt></block></li><li id="sec.89-ssec.1-para1.c" guid="_1586187d-5219-4eff-abba-9d1677216a72" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">agrees to a superseded planning scheme request for a superseded planning scheme to apply to the carrying out of particular development.</txt></block></li></list></block></subclause><subclause id="sec.89-ssec.2" guid="_05305939-07ff-4f87-a3eb-261f570e130a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The local government must—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.89-ssec.2-para1.a" guid="_af02354b-d118-4a57-a38f-5930c53bbb05" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">note the approval or decision on the local government’s planning scheme; and</txt></block></li><li id="sec.89-ssec.2-para1.b" guid="_b7e56886-f29f-4f5b-a5a6-d75d68b4de85" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">give notice of the notation, and the premises to which the note relates, to the chief executive.</txt></block></li></list></block></subclause><subclause id="sec.89-ssec.3" guid="_f75f5d89-3249-42d0-b796-cb24350a54d6" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The note does not amend the planning scheme.</txt></block></subclause><subclause id="sec.89-ssec.4" guid="_b03a4f5e-b4f9-4a5f-be70-d724991d734f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">Failure to comply with subsection (2) does not affect the validity of the approval or decision.</txt></block></subclause></clause></division></part><part id="ch.3-pt.6" guid="_9fcf9416-040b-441e-b3d1-365aa488bde3" status="uncommenced" affected.by.uncommenced="0"><no>Part 6</no><heading id="ch.3-pt.6-he" guid="_66de14b6-6ec1-4a05-a02c-e08e7b5e63e5">Minister’s powers</heading><division id="ch.3-pt.6-div.1" guid="_eb8cc5a9-cfdb-45d3-97ab-c87caf173be4" status="uncommenced" affected.by.uncommenced="0"><no>Division 1</no><heading id="ch.3-pt.6-div.1-he" guid="_9353514a-af68-4787-995e-076b54750683">Introduction</heading><clause id="sec.90" guid="_efe663ec-e859-4048-963d-3db53387ac60" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>90</no><heading id="sec.90-he" guid="_83826627-3aa1-44da-866f-3d663c1df04c">What part applies to</heading><subclause id="sec.90-ssec.1" guid="_b710c54f-4faa-46b9-af1b-78876e336fa8" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">	This part applies to the following (an <defterm id="sec.90-def.application" guid="_fd8da3b3-27f1-4ad7-8ad2-6eb15061c1b7" type="definition">application</defterm>)—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.90-ssec.1-para1.a" guid="_919f509e-ea64-444a-8403-1b9b5a305d8f" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a development application;</txt></block></li><li id="sec.90-ssec.1-para1.b" guid="_2e1db63f-aa0e-48f3-8932-5f71ee86cd91" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">change representations;</txt></block></li><li id="sec.90-ssec.1-para1.c" guid="_8f537a3c-385b-4b52-8e7b-6619b9a72643" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">a change application;</txt></block></li><li id="sec.90-ssec.1-para1.d" guid="_5f3a1da7-f6d5-43b2-97f9-eb761e185229" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">an extension application;</txt></block></li><li id="sec.90-ssec.1-para1.e" guid="_2aeb7af3-1cb6-44b1-92b5-bdf4ad5c6946" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">a cancellation application.</txt></block></li></list></block></subclause><subclause id="sec.90-ssec.2" guid="_26ea826d-2257-4800-b4bf-997e95685772" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">In this part, the <defterm id="sec.90-def.decisionmaker" guid="_c697b276-b04b-4306-871b-fb546592f112" type="definition">decision-maker</defterm> for an application is—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.90-ssec.2-para1.a" guid="_f734e240-883b-4a4b-ba72-d1f97fe1b273" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for a change application—the responsible entity; or</txt></block></li><li id="sec.90-ssec.2-para1.b" guid="_7c4c184e-d19c-44d5-bff1-6dc1023854d0" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">otherwise—the assessment manager.</txt></block></li></list></block></subclause></clause><clause id="sec.91" guid="_df77d70d-452f-4026-8841-14f6c7c0aea8" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>91</no><heading id="sec.91-he" guid="_a459a3c0-da45-4f92-bf2a-ddd8ca0b8753">Limit on Minister’s powers</heading><block status="uncommenced"><txt break.before="1">The Minister may exercise a power under this part in relation to a matter only if the matter involves, or is likely to involve, a State interest.</txt></block></clause></division><division id="ch.3-pt.6-div.2" guid="_46bb88f4-c520-44ef-bf6c-4b597ffcb996" status="uncommenced" affected.by.uncommenced="0"><no>Division 2</no><heading id="ch.3-pt.6-div.2-he" guid="_388239b0-5b9d-4375-bcb3-001db3fc1c8a">Minister’s directions</heading><subdivision id="ch.3-pt.6-div.2-sdiv.1" guid="_8fe77d57-830d-4aeb-a104-f09f98ed4eca" status="uncommenced" affected.by.uncommenced="0"><no>Subdivision 1</no><heading id="ch.3-pt.6-div.2-sdiv.1-he" guid="_771f96db-bd9f-4a6f-a17b-49451fbd8532">Directions generally</heading><clause id="sec.92" guid="_afa62024-a03e-4923-a3d2-9f734973b753" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>92</no><heading id="sec.92-he" guid="_593e6491-5cf0-4868-9803-33157a6dfd9b">Minister not required to notify, consult or consider particular material</heading><block status="uncommenced"><txt break.before="1">When exercising a power under this division, the Minister need not—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.92-para1.a" guid="_9cefecf0-f2e1-499f-860e-9ebe417e33b6" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">give notice to anyone other than under subdivision 2 or 3; or</txt></block></li><li id="sec.92-para1.b" guid="_8fb76582-c412-4d8a-bed9-4ea9ca24766f" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">consult with anyone; or</txt></block></li><li id="sec.92-para1.c" guid="_a3b9dc18-92bf-4793-9118-642d3b53b138" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">consider any material given to the Minister by or for a person in relation to the exercise or proposed exercise of the power.</txt></block></li></list></block></clause><clause id="sec.93" guid="_f8ef36a3-e085-41da-84f8-56705f0bf114" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>93</no><heading id="sec.93-he" guid="_a5b989fe-3508-4a61-94c7-433a0be5e996">Directions generally</heading><subclause id="sec.93-ssec.1" guid="_ef287a04-254c-45eb-b310-9791eb1b21fb" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A direction given by the Minister must state—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.93-ssec.1-para1.a" guid="_20e6790f-17c9-4e7d-a340-fa2a136a8a20" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the Minister’s reasons for the direction; and</txt></block></li><li id="sec.93-ssec.1-para1.b" guid="_c5535ceb-a01d-4eef-bfdb-f1b5bcf348ca" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the State interest for which the direction is given.</txt></block></li></list></block></subclause><subclause id="sec.93-ssec.2" guid="_751bc056-d33a-4636-a3bd-f8257c88274b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The recipient of the direction must comply with the direction.</txt></block></subclause><subclause id="sec.93-ssec.3" guid="_b3cdabcb-f599-4cae-ae73-2c528ef7533e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The Minister may consider any failure to comply with the direction when exercising another power under this part.</txt></block></subclause></clause></subdivision><subdivision id="ch.3-pt.6-div.2-sdiv.2" guid="_40181fda-89b9-42d7-a779-15204666c804" status="uncommenced" affected.by.uncommenced="0"><no>Subdivision 2</no><heading id="ch.3-pt.6-div.2-sdiv.2-he" guid="_5007febc-c532-4b10-b2d5-822d140d873a">Directions to decision-makers</heading><clause id="sec.94" guid="_4b982b85-668c-4f27-9830-dc7872f99679" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>94</no><heading id="sec.94-he" guid="_d855284c-21c7-4341-9134-0a23727f9fa0">Directions to decision-makers—future applications</heading><subclause id="sec.94-ssec.1" guid="_bdfbbbc2-cd4a-4650-987e-c5ace659014f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The Minister may, by gazette notice, direct a decision-maker to give copies of all future applications of a specified type to the Minister at a stated time.</txt></block></subclause><subclause id="sec.94-ssec.2" guid="_f3c36655-9314-4056-853f-afb69258b3ee" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The Minister must give a copy of the direction to—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.94-ssec.2-para1.a" guid="_0de71c94-b2ad-4244-bf54-e3cdcd304903" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the decision-maker; and</txt></block></li><li id="sec.94-ssec.2-para1.b" guid="_4ea41ac5-99f9-41d2-8ee4-d7ccd486df12" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">each person, other than the chief executive, that the Minister considers is likely to be—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.94-ssec.2-para1.b-para2.i" guid="_931f48ea-3738-49ac-8b2b-57ef18cbece7" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a referral agency in relation to that type of application; and</txt></block></li><li id="sec.94-ssec.2-para1.b-para2.ii" guid="_9a209b60-0ff7-4395-9c72-3483985a8669" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">if the decision-maker is not the assessment manager in relation to that type of application—the assessment manager.</txt></block></li></list></block></li></list></block></subclause></clause><clause id="sec.95" guid="_2a426d6b-5419-461a-a494-709b17892816" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>95</no><heading id="sec.95-he" guid="_fd45e959-5e7f-475e-ab22-366ade46067d">Directions to decision-makers—current applications</heading><subclause id="sec.95-ssec.1" guid="_8b3f91af-bb1f-4bad-94c3-5c9637068681" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The Minister may, by gazette notice, direct a decision-maker to do any of the following in relation to an undecided application—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.95-ssec.1-para1.a" guid="_602bcc3b-f433-4dd0-9de2-796734d3e0c9" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">to exercise one of the decision-maker’s functions, within a stated reasonable period;</txt></block></li><li id="sec.95-ssec.1-para1.b" guid="_9088f48b-e3d4-4313-91bd-b595a90e9ec9" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">not to decide the application, within a stated period of at least 20 business days;</txt></block></li><li id="sec.95-ssec.1-para1.c" guid="_50adc25d-a079-4373-9f07-bfb69cbeaa8f" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">to decide the application, within a stated period of at least 20 business days;</txt></block></li><li id="sec.95-ssec.1-para1.d" guid="_9b236314-a8b5-4ed4-a0c1-24a3ad8f2a1f" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">for a development application for which a deemed approval has not taken effect under section 64—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.95-ssec.1-para1.d-para2.i" guid="_ea0513e9-abf9-49cc-98be-2b6be970e137" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">to impose stated development conditions on any development approval given; or</txt></block></li><li id="sec.95-ssec.1-para1.d-para2.ii" guid="_7fc7eeef-3b18-4bf7-80ee-5ed6f5804b26" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">to give a preliminary approval for all or part of the application;</txt></block></li></list></block></li><li id="sec.95-ssec.1-para1.e" guid="_c4097efd-7384-4ef7-9a9a-d7589d89a894" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">for change representations or a change application—to impose, or amend, stated development conditions on the development approval.</txt></block></li></list></block></subclause><subclause id="sec.95-ssec.2" guid="_5ae2042d-db83-4251-9d25-801e820d6477" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">For subsection (1)(b)—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.95-ssec.2-para1.a" guid="_2bbc1c89-e2c7-43ec-bd77-d770c9b3ef68" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a direction not to decide an application must state that the Minister may, within the stated period, call in the application or give a further direction; and</txt></block></li><li id="sec.95-ssec.2-para1.b" guid="_1a6cbf49-11b0-4091-8f83-04da3835d5e2" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the Minister may not call in the application after the stated period ends.</txt></block></li></list></block></subclause><subclause id="sec.95-ssec.3" guid="_5ff40f62-ed15-4c8c-9f34-28f19e5aefb4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The Minister must give a copy of the direction to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.95-ssec.3-para1.a" guid="_3412e461-d8a3-4ef0-8831-0f81adb6559c" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the decision-maker; and</txt></block></li><li id="sec.95-ssec.3-para1.b" guid="_f19fa0e9-7fe6-475d-b30e-4804b86998ae" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the applicant; and</txt></block></li><li id="sec.95-ssec.3-para1.c" guid="_b0ee4b7e-ab50-405a-aea4-6cc7cb6f158d" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">for an application other than change representations—each referral agency other than the chief executive.</txt></block></li></list></block></subclause><subclause id="sec.95-ssec.4" guid="_4803abff-fdc4-4736-b638-046a404c31c9" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">If a direction not to decide an application is given—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.95-ssec.4-para1.a" guid="_d79aa874-3864-4cb5-a234-7f5055996e99" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the process for administering the application stops when the direction is given; and</txt></block></li><li id="sec.95-ssec.4-para1.b" guid="_cfc4e116-cd11-4f65-8d40-dcf300e3b31b" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the balance of the process restarts on the day after—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.95-ssec.4-para1.b-para2.i" guid="_59ddfc6f-4dc4-4e75-ae3d-559ccedd8994" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the stated period ends; or</txt></block></li><li id="sec.95-ssec.4-para1.b-para2.ii" guid="_956b3055-491b-45cb-b0a5-6b2f9365a294" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">if the Minister calls in the application or gives another direction before the stated period ends—the Minister calls in the application or gives the other direction.</txt></block></li></list></block></li></list></block></subclause></clause><clause id="sec.96" guid="_dfe3f29c-cc1e-480c-bdb4-a469cbaaa560" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>96</no><heading id="sec.96-he" guid="_1b480aa3-697a-4c7a-ba43-25856dd48ab2">Directions about alternative assessment managers</heading><subclause id="sec.96-ssec.1" guid="_04d651f7-7015-4eac-80b8-fb6a2366b35e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The Minister may, by gazette notice, direct an entity mentioned in section 48(3)(a)—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.96-ssec.1-para1.a" guid="_2e11049c-9617-4961-b205-08e9c37b3463" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">not to keep a list under that subsection for development of a type stated in the direction; or</txt></block></li><li id="sec.96-ssec.1-para1.b" guid="_44e1118a-cb05-4315-83f4-0cc948cb2529" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">to remove a person from a list under that subsection.</txt></block></li></list></block></subclause><subclause id="sec.96-ssec.2" guid="_9b523fb9-6d3c-48ac-9d0e-c90b7a2013ac" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The Minister must give a copy of the notice to—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.96-ssec.2-para1.a" guid="_8842484b-1114-4bf5-8bd1-92ea69769b48" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the entity; and</txt></block></li><li id="sec.96-ssec.2-para1.b" guid="_0a695c0f-613c-49d5-8ab2-f6cbdb4e87da" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the direction is to remove a person from the list—the person.</txt></block></li></list></block></subclause></clause><clause id="sec.97" guid="_a1c06293-682d-4496-8169-05a62404d307" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>97</no><heading id="sec.97-he" guid="_b2e4e360-6cf1-40d8-ab06-b270d41ef25e">Report about directions</heading><subclause id="sec.97-ssec.1" guid="_1a8b42eb-8bcf-4597-8965-731a796e711f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">If the Minister gives a direction, the Minister must prepare a report that—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.97-ssec.1-para1.a" guid="_9ba28f9c-ce57-4f2c-8a7d-f8314c8876c1" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">explains the nature of the direction and the matters the Minister considered in making the direction; and</txt></block></li><li id="sec.97-ssec.1-para1.b" guid="_0d44f893-6836-4b50-983c-03ad226c6be2" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">includes a copy of the direction.</txt></block></li></list></block></subclause><subclause id="sec.97-ssec.2" guid="_7e882f1d-1a00-42ab-91c6-48b32785ff1d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The Minister must table a copy of the report in the Legislative Assembly within 14 sitting days after giving the direction.</txt></block></subclause></clause></subdivision><subdivision id="ch.3-pt.6-div.2-sdiv.3" guid="_88aa85ab-70de-47d6-97d9-90bcabc3dfb7" status="uncommenced" affected.by.uncommenced="0"><no>Subdivision 3</no><heading id="ch.3-pt.6-div.2-sdiv.3-he" guid="_fe3208c1-8009-42ef-b699-fe7abcad6735">Directions to referral agencies</heading><clause id="sec.98" guid="_3399deb7-c89d-4149-8cc2-ad984d530fe6" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>98</no><heading id="sec.98-he" guid="_dba6ecc8-c50b-4420-b97e-e0d9fb7f7564">What this subdivision is about</heading><block status="uncommenced"><txt break.before="1">This subdivision is about directions that the Minister may give to a referral agency for the following applications—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.98-para1.a" guid="_64e42298-4a43-4096-96ea-42ec34bd03be" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a development application;</txt></block></li><li id="sec.98-para1.b" guid="_e87ad6f8-b4ac-4470-860c-82e0e8021706" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a change application other than for a minor change.</txt></block></li></list></block></clause><clause id="sec.99" guid="_8d151072-1b1d-4e84-b318-0afb8b2a649f" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>99</no><heading id="sec.99-he" guid="_8a08a8d2-9f40-4154-90a2-77f0b531e62c">Directions to referral agency</heading><subclause id="sec.99-ssec.1" guid="_5b3bc3f9-82ff-4ef9-bc28-1c9c15990003" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The Minister may, before or after the end of the period for a referral agency to assess an application, direct the referral agency—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.99-ssec.1-para1.a" guid="_3e931073-5bb9-4d1e-8c4d-bccc16753dc7" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">to reissue the referral agency’s response—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.99-ssec.1-para1.a-para2.i" guid="_f4e794d8-9635-4c50-980c-737419b7932f" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">if the Minister considers the response directs the imposition of a condition that does not comply with section 65 or 66—without the condition or with another condition; or</txt></block></li><li id="sec.99-ssec.1-para1.a-para2.ii" guid="_d951589b-3767-4a08-9b48-d5c19b74d56b" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">if the Minister considers the response is not within the referral agency’s functions—in a stated way to ensure the response is within the referral agency’s functions; or</txt></block></li><li id="sec.99-ssec.1-para1.a-para2.iii" guid="_a91e4fe1-867f-4103-b11b-b139a5e8e285" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">if the Minister considers the referral agency has not adequately assessed the application—in a stated way that the Minister considers reflects an adequate assessment of the application; or</txt></block></li></list></block></li><li id="sec.99-ssec.1-para1.b" guid="_b7186cd0-2804-4422-8fff-acd7a8773234" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the Minister considers the referral agency has contravened a period for taking an action under the process for administering the application—to take the action within a stated reasonable period.</txt></block></li></list></block></subclause><subclause id="sec.99-ssec.2" guid="_583e241a-ca5c-4027-b5ab-ec26c41930a5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">At the same time as the Minister gives the direction to the referral agency, the Minister must give a copy of the direction to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.99-ssec.2-para1.a" guid="_6f672d4e-1f23-45e1-8084-63337bd5225a" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the applicant; and</txt></block></li><li id="sec.99-ssec.2-para1.b" guid="_18321fd4-378b-4785-9f10-0d3ed706dfbc" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">any other referral agency; and</txt></block></li><li id="sec.99-ssec.2-para1.c" guid="_1e73cf69-7336-4d5d-b96b-d8d196a2777e" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the decision-maker.</txt></block></li></list></block></subclause></clause><clause id="sec.100" guid="_83abf1fb-bb6e-400a-a610-0170326a5510" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>100</no><heading id="sec.100-he" guid="_ac70145d-86ee-4025-8f5a-fd892a5fabd3">Effect of direction</heading><block status="uncommenced"><txt break.before="1">If the Minister gives a direction to a referral agency, the decision-maker must not decide the application until the referral agency complies with the direction.</txt></block></clause></subdivision></division><division id="ch.3-pt.6-div.3" guid="_eb8eda0c-c64d-45b5-b174-03983242e19b" status="uncommenced" affected.by.uncommenced="0"><no>Division 3</no><heading id="ch.3-pt.6-div.3-he" guid="_58a8074c-ee4d-46f0-9b2e-699f4d372212">Minister’s call in</heading><clause id="sec.101" guid="_0d3bc04d-7d22-4544-8770-03fe01819786" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>101</no><heading id="sec.101-he" guid="_4a684b21-3200-4c44-9286-c65b5b53775c">What this division is about</heading><block status="uncommenced"><txt break.before="1">This division is about the Minister’s power to call in an application.</txt></block></clause><clause id="sec.102" guid="_e86078c6-8420-4194-9daa-3bfb2d57cbf8" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>102</no><heading id="sec.102-he" guid="_f4764ede-340b-40f5-bf3f-575147802dae">Seeking representations about proposed call in</heading><subclause id="sec.102-ssec.1" guid="_b2a6e4f0-1b07-4d69-a114-6a83364f6c00" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if the Minister proposes to call in an application.</txt></block></subclause><subclause id="sec.102-ssec.2" guid="_01752a15-b330-447c-b394-e4085c3404f3" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The Minister must give a notice (the <defterm id="sec.102-def.proposedcallinnotice" guid="_3de6a5d7-de04-459f-9e93-3a8b256ef49c" type="definition">proposed call in notice</defterm>) seeking representations about the proposed call in to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.102-ssec.2-para1.a" guid="_6be50f1f-0d23-4ec7-89c6-3b5b4cce08c8" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the decision-maker; and</txt></block></li><li id="sec.102-ssec.2-para1.b" guid="_9b9600ca-03d8-4e7d-a6bb-2ad15332a52d" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the applicant; and</txt></block></li><li id="sec.102-ssec.2-para1.c" guid="_0bb8cf15-b389-4d79-bfb7-7b3439b6474f" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">each referral agency, other than the chief executive; and</txt></block></li><li id="sec.102-ssec.2-para1.d" guid="_9dd7db2f-ecf0-435e-a1c5-a7dce18f2b03" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">if the application is a development application or change application other than for a minor change—any submitters for the application who the Minister is aware of when the notice is given.</txt></block></li></list></block></subclause><subclause id="sec.102-ssec.3" guid="_b86fceb4-84ef-4142-9c70-ecf57be9cbcf" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">A regulation may prescribe matters in relation to the giving of the notice, including—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.102-ssec.3-para1.a" guid="_bcebaf7b-a205-458c-86e2-c491c7f05e82" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the contents of the notice; and</txt></block></li><li id="sec.102-ssec.3-para1.b" guid="_069175d9-dd49-4f8b-b33d-4a2d90568bf0" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">when the notice must be given; and</txt></block></li><li id="sec.102-ssec.3-para1.c" guid="_2907911c-e6f5-485a-8f1f-63c325a8cb7d" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the effect of giving the notice on—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.102-ssec.3-para1.c-para2.i" guid="_3a30ce50-ff89-4fc6-b8f9-b7515225d153" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the process for assessing and deciding the application; or</txt></block></li><li id="sec.102-ssec.3-para1.c-para2.ii" guid="_b7a67662-d571-44cb-ab87-a516848d0f80" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">any appeal period in relation to the application; and</txt></block></li></list></block></li><li id="sec.102-ssec.3-para1.d" guid="_a84d2365-13bc-4172-8f3d-8d438120ad21" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">the period (the <defterm id="sec.102-ssec.3-def.representationperiod" guid="_f928ace5-7b2b-4c18-b4ea-5bd4f87fcb7d" type="definition">representation period</defterm>) within which a person may make representations about the proposed call in; and</txt></block></li><li id="sec.102-ssec.3-para1.e" guid="_bb3ac799-a8c4-4a85-8a35-5ceb5f17a95e" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">procedures for notifying persons of the Minister’s decision in relation to any representation.</txt></block></li></list></block></subclause><subclause id="sec.102-ssec.4" guid="_92185a20-8ab1-4038-a404-ee39f8820322" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The Minister must consider any representations made during the representation period before deciding whether to call in the application.</txt></block></subclause><subclause id="sec.102-ssec.5" guid="_85ebbaf3-2dbb-475b-a881-fb96f22fdc1c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">Any approval or deemed approval for the application is taken not to be in effect from the day the applicant receives the proposed call in notice until—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.102-ssec.5-para1.a" guid="_0011c108-7485-4689-8ea4-2f9f0d974bc4" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if the Minister decides not to call in the application—the day the applicant receives notice of the Minister’s decision; or</txt></block></li><li id="sec.102-ssec.5-para1.b" guid="_23f84bea-ed75-4062-a820-594a71059552" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the Minister decides to call in the application—the day the applicant receives a call in notice for the approval or deemed approval.</txt></block></li></list></block></subclause><subclause id="sec.102-ssec.6" guid="_37d01c97-b012-476a-b34d-ea73a2526ffc" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">The decision-maker must not cancel a development approval after the decision-maker receives the proposed call in notice, unless the Minister decides not to call in the application.</txt></block></subclause></clause><clause id="sec.103" guid="_35d5a615-a27f-4044-9d72-4ae9748885fe" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>103</no><heading id="sec.103-he" guid="_ecc13b53-1613-400d-b150-eeb1d535b623">Call in notice</heading><subclause id="sec.103-ssec.1" guid="_c143e7f8-39d1-4ada-9178-bccc384a9cf5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The Minister may call in an application by giving a notice (a <defterm id="sec.103-def.callinnotice" guid="_8f065d6c-8ee0-402e-8847-25c22c4c72db" type="definition">call in notice</defterm>) to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.103-ssec.1-para1.a" guid="_9eb74ae1-113d-45c6-8856-f871ba3d8917" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the decision-maker; and</txt></block></li><li id="sec.103-ssec.1-para1.b" guid="_de7a0d58-478a-4d0d-847e-886d066e3c4b" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the applicant; and</txt></block></li><li id="sec.103-ssec.1-para1.c" guid="_580ecff6-67f4-4f7e-b47b-922a7f84ae1f" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">any referral agency in relation to the application, other than the chief executive; and</txt></block></li><li id="sec.103-ssec.1-para1.d" guid="_6bf9527f-3407-4714-a8f8-73472809b772" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">for a development application or change application—any principal submitter; and</txt></block></li><li id="sec.103-ssec.1-para1.e" guid="_bc1d8aa8-7a91-4450-be72-6168b153584f" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">if there are proceedings relating to the application in the P&#38;E Court—the court.</txt></block></li></list></block></subclause><subclause id="sec.103-ssec.2" guid="_ce8fd000-51b4-4ccf-9638-5a683b89f356" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The notice must be given within 20 business days after the end of the representation period for the proposed call in notice.</txt></block></subclause><subclause id="sec.103-ssec.3" guid="_04fbf0d4-d3d1-435e-98be-23b7f04f7478" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The notice must state—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.103-ssec.3-para1.a" guid="_0139b4a8-6408-40fc-9476-a50a2e131f4e" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the reasons for the call in, including the State interest giving rise to the call in; and</txt></block></li><li id="sec.103-ssec.3-para1.b" guid="_d1947db5-589c-4e81-ba18-ec24244df8b5" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for an application that is not a cancellation application—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.103-ssec.3-para1.b-para2.i" guid="_07950c8b-1b0c-4099-bd5d-5adad462fefd" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">whether the Minister intends to assess and decide the application, or direct the decision-maker to assess all or part of the application; and</txt></block></li><li id="sec.103-ssec.3-para1.b-para2.ii" guid="_524ef1c0-2c2b-44e6-b624-a671c5f19e95" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the point (the <defterm id="sec.103-ssec.3-para1.b-def.restartingpoint" guid="_63c756e5-b321-496f-8025-35da26456b26" type="definition">restarting point</defterm>) in the process for administering the application, that the Minister decides, from which the process must restart.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.103-ssec.4" guid="_92972d64-40f6-4288-bd4d-ca359e661fa8" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">When deciding the restarting point, the Minister may consider anything the Minister considers relevant.</txt></block></subclause></clause><clause id="sec.104" guid="_82e48d9e-0917-4638-8515-562aace89c68" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>104</no><heading id="sec.104-he" guid="_d2f236e8-c177-4f0f-8555-ad2de02e71c2">Effect of call in notice</heading><subclause id="sec.104-ssec.1" guid="_db37fb31-784b-4ece-896a-a0b82df10a5d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">When the Minister gives a call in notice to the decision-maker—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.104-ssec.1-para1.a" guid="_77258bd7-cf03-4617-8a0a-8d6480f04aaa" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">any decision by the decision-maker is of no effect; and</txt></block></li><li id="sec.104-ssec.1-para1.b" guid="_09a884e4-865f-42ba-898a-ee1fab379d3c" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">any appeal against a decision by the decision-maker is discontinued; and</txt></block></li><li id="sec.104-ssec.1-para1.c" guid="_88a329bd-3af4-4a99-bf4c-7979062d0aee" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the process for assessing the application starts again from the restarting point.</txt></block></li></list></block></subclause><subclause id="sec.104-ssec.2" guid="_baa6d540-7303-4b24-b00e-cf8807330883" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The giving of a call in notice does not stop a local government giving or amending an infrastructure charges notice.</txt></block></subclause></clause><clause id="sec.105" guid="_f37d0bad-4705-4c95-aa00-6ad0c08206d9" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>105</no><heading id="sec.105-he" guid="_84980634-09ec-44e7-849c-40d1ce6026ab">Deciding called in application</heading><subclause id="sec.105-ssec.1" guid="_d408db55-74b0-4ba7-8b7c-b9d40dd9c267" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">If the Minister gives a call in notice to the decision-maker, other than for a cancellation application, the Minister may—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.105-ssec.1-para1.a" guid="_b1a028fb-e7bd-4ccb-9909-1da86c4a32c1" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">assess and decide all or part of the application; or</txt></block></li><li id="sec.105-ssec.1-para1.b" guid="_4877f14e-03a6-43f3-8c21-c7c16f8c8126" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the call in notice is given before the decision-maker decides the application—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.105-ssec.1-para1.b-para2.i" guid="_d88122cb-d3e7-429b-ac42-2b56846a6a39" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">direct the decision-maker to assess all or part of the application; and</txt></block></li><li id="sec.105-ssec.1-para1.b-para2.ii" guid="_2570a765-64be-4862-bb0e-598a69cca3fb" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">decide the application, or part of the application, based on the decision-maker’s assessment.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.105-ssec.2" guid="_9ba80aca-e90f-4683-99bf-2de1fb570983" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">If the Minister gives a call in notice to the decision-maker for a cancellation application, and the application complies with section 84(1), the Minister must cancel the development approval.</txt></block></subclause><subclause id="sec.105-ssec.3" guid="_01584678-b0f4-4eaf-b8dd-429b735106d5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The decision-maker must give all reasonable help that the Minister requires to assess or decide the application.</txt><note id="sec.105-ssec.3-note" guid="_135f0553-5215-4e38-97fc-8939e67918a4" type="example"><heading id="sec.105-ssec.3-note-he" guid="_229a297d-69ba-4758-ac50-6d161ddb4f47">Examples—</heading><block status="uncommenced"><list number.type="bull" unnumbered.indent="0"><li id="sec.105-ssec.3-note-para1" guid="_c0ff3ff4-196b-4c86-ad79-6937e99622c5" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">giving all material about the application that the original assessment manager had before the call in or receives after the call in</txt></block></li><li id="sec.105-ssec.3-note-para1-oc.2" guid="_e29a4684-b570-43ac-8456-42463abca9af" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">giving any other material relevant to assessing the application</txt></block></li></list></block></note></block></subclause><subclause id="sec.105-ssec.4" guid="_15c09e51-4993-4050-949c-57a360d146ac" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The following provisions do not apply to the application—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.105-ssec.4-para1.a" guid="_59a63f50-b0ce-4711-bc77-1097984b482c" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for a development application—sections 45(3) to (7), 60 to 62, to the extent those sections impose obligations on the assessment manager, and section 64;</txt></block></li><li id="sec.105-ssec.4-para1.b" guid="_5b4fec0a-8dc7-40e8-a009-f214fb36a3bf" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for change representations—section 76(1);</txt></block></li><li id="sec.105-ssec.4-para1.c" guid="_a80c395f-9c4a-4041-ad3e-52261959c240" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">for a change application for a minor change—section 81;</txt></block></li><li id="sec.105-ssec.4-para1.d" guid="_ee0aad8a-d064-4a04-8d32-00d1723865b4" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">for a change application for a change that is not a minor change—section 82;</txt></block></li><li id="sec.105-ssec.4-para1.e" guid="_6cf7b009-fdb6-42fb-b2a5-a8dbdb95b5fa" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">for an extension application—section 87(1) to (4).</txt></block></li></list></block></subclause><subclause id="sec.105-ssec.5" guid="_80001d7a-5312-448a-820b-e7e29de2253b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">For an application that is not a cancellation application, the Minister may consider anything the Minister considers relevant.</txt></block></subclause><subclause id="sec.105-ssec.6" guid="_edc55781-f72d-4f59-8081-e6a35b3d58e5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">The Minister need not consider any referral agency’s response.</txt></block></subclause><subclause id="sec.105-ssec.7" guid="_37513ffa-8244-4bc7-b273-8c5919aad96a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">The period under this chapter or the development assessment rules between the day the last procedural event for the application ends, and the day before the application must be decided, is replaced by—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.105-ssec.7-para1.a" guid="_7bed674a-45f9-4c2b-ba96-c5767caae997" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">30 business days; or</txt></block></li><li id="sec.105-ssec.7-para1.b" guid="_1900b24d-0566-4b23-a5f7-0800f27114d6" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if, before the 30 business days end, the Minister gives a notice extending the period to the entities in section 103(1)—50 business days.</txt></block></li></list></block></subclause><subclause id="sec.105-ssec.8" guid="_448b8884-08a0-486f-814f-38ad03f71d31" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(8)</no><block status="uncommenced"><txt break.before="1">The requirements for the content of notices under sections 63, 83(2) and (3), and 87(5) apply only to the extent the Minister considers relevant.</txt></block></subclause><subclause id="sec.105-ssec.9" guid="_5736d94d-448e-493a-8f0f-9b567311c12b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(9)</no><block status="uncommenced"><txt break.before="1">The notice that the Minister gives about the Minister’s decision must state—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.105-ssec.9-para1.a" guid="_5841fa37-fffc-4b46-8a4c-b37ae7a0cc6d" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the matters the Minister considered in making the decision; and</txt></block></li><li id="sec.105-ssec.9-para1.b" guid="_d58a8a6e-f1db-46f9-8309-35bec52555ff" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the Minister decided only part of the application—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.105-ssec.9-para1.b-para2.i" guid="_cb5e21c5-1b7d-428a-9888-fa9c10148177" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">that the assessment manager must assess and decide the other part; and</txt></block></li><li id="sec.105-ssec.9-para1.b-para2.ii" guid="_6cbed240-7496-4ea8-9ce6-fda097a8345a" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the point in the process for assessing the application, and the day from which the assessment must restart, for the other part.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.105-ssec.10" guid="_f3b3ef48-7795-4ef1-9da5-50d37f951856" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(10)</no><block status="uncommenced"><txt break.before="1">The Minister must give the notice to each person who was required to be given the call in notice.</txt></block></subclause><subclause id="sec.105-ssec.11" guid="_ad4e96f8-3275-4b63-a5aa-8ccc6bd622c0" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(11)</no><block status="uncommenced"><txt break.before="1">If the notice is about change representations, the notice does not replace the decision notice for the development application or change application.</txt></block></subclause><subclause id="sec.105-ssec.12" guid="_ad146ca3-66d4-45ae-befd-bf1ae90cd149" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(12)</no><block status="uncommenced"><txt break.before="1">However, any development conditions decided by the Minister are part of the development approval and apply instead of any other development conditions, to the extent of any inconsistency.</txt></block></subclause><subclause id="sec.105-ssec.13" guid="_b0680cb9-7901-44ab-90b8-7baba234b116" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(13)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.105-ssec.13-def.proceduralevent_" guid="_6388d351-dbfd-492c-a302-22349a75fba0" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.105-ssec.13-def.proceduralevent" guid="_55a55c32-4686-42d8-99d2-42f6881c36fa" type="definition">procedural event</defterm> means any action that must be completed, for the application under the process for administering the application, after the application is called in but before a decision about the application must be made, including—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.105-ssec.13-def.proceduralevent-para1.a" guid="_5a596147-6550-47e8-9a06-ba4dc45dd0f9" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">responding to a request for further information made under the process; and</txt></block></li><li id="sec.105-ssec.13-def.proceduralevent-para1.b" guid="_7f4fcaf2-52e1-459d-8602-06ebb87f9ff0" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">giving a referral agency response; and</txt></block></li><li id="sec.105-ssec.13-def.proceduralevent-para1.c" guid="_94f17314-a1d3-4935-b502-e8456e58c7d5" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">giving a response notice under section 80; and</txt></block></li><li id="sec.105-ssec.13-def.proceduralevent-para1.d" guid="_fc42742a-7f2e-4365-a187-137ce62b9fde" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">making properly made submissions.</txt></block></li></list></definition></deflist></block></subclause></clause><clause id="sec.106" guid="_864f1b6e-f565-46af-9871-3106d2156249" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>106</no><heading id="sec.106-he" guid="_58d1e43a-a80b-484d-8e6c-0e5f88d265bc">Report about call ins</heading><subclause id="sec.106-ssec.1" guid="_e53d2bde-004f-42be-8a9b-fa387027da2e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">If the Minister decides a called in application, the Minister must prepare a report that—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.106-ssec.1-para1.a" guid="_ec31687e-f2d5-4dbc-8a60-cf58c50b0c9a" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">explains the nature of the decision and the matters the Minister considered in making the decision; and</txt></block></li><li id="sec.106-ssec.1-para1.b" guid="_90499ba1-5cb0-4392-a889-646003c69b9f" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">includes a copy of the notice of the decision.</txt></block></li></list></block></subclause><subclause id="sec.106-ssec.2" guid="_7a99de16-2f2e-4a8c-9a16-4bf9ec3621b0" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The Minister must table a copy of the report in the Legislative Assembly within 14 sitting days after giving the notice of the decision.</txt></block></subclause></clause></division></part><part id="ch.3-pt.7" guid="_e0a95330-44c6-4e4d-9d25-59b3945ee327" status="uncommenced" affected.by.uncommenced="0"><no>Part 7</no><heading id="ch.3-pt.7-he" guid="_9614cdb1-e45d-43a7-8e71-e5c9eb8edb11">Miscellaneous</heading><clause id="sec.107" guid="_02b58fa2-71c4-4f8c-9ba3-c642c013183a" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>107</no><heading id="sec.107-he" guid="_f64320f0-2f1f-4004-82f3-c48aec589a1e">Valid use or preservation covenants</heading><subclause id="sec.107-ssec.1" guid="_9a47e23f-e73b-47c8-97be-57970cbd9640" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A use or preservation covenant entered into in connection with a development application is of no effect unless the covenant is required under—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.107-ssec.1-para1.a" guid="_d9ad4910-6398-4719-8a50-093fc0ae15e9" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a development condition; or</txt></block></li><li id="sec.107-ssec.1-para1.b" guid="_4f2cb28d-659a-4049-8287-d8164c94c46d" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">an infrastructure agreement.</txt></block></li></list></block></subclause><subclause id="sec.107-ssec.2" guid="_ab20dbb2-0f15-4d3a-965d-2e2138e03520" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">If—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.107-ssec.2-para1.a" guid="_a408beb7-1404-4cf0-8f55-c7313a4c9efe" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the requirement for a use or preservation covenant under a development condition or infrastructure agreement is removed; or</txt></block></li><li id="sec.107-ssec.2-para1.b" guid="_0bfef425-f58c-4655-bff5-cfac8a82a60d" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the development approval or infrastructure agreement lapses;</txt></block></li></list><txt break.before="1">the covenantee must register an instrument releasing the covenant.</txt></block></subclause><subclause id="sec.107-ssec.3" guid="_072b932f-3241-4223-ae3e-bb667bd5e1ae" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">If a development condition or infrastructure agreement is changed in a way that affects rights or responsibilities under a use or preservation covenant—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.107-ssec.3-para1.a" guid="_c8b10eb3-2709-4386-9c70-28d416af2d01" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the covenantee and the covenantor must execute a valid instrument that amends the covenant to reflect the change; and</txt></block></li><li id="sec.107-ssec.3-para1.b" guid="_701754f6-f734-4dc4-a1df-b525e9aae6cd" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the covenantor must register the instrument.</txt></block></li></list></block></subclause><subclause id="sec.107-ssec.4" guid="_ebec2e80-7901-4ebe-ba4f-00637e786473" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.107-ssec.4-def.register_" guid="_287bc99a-a170-465b-aa39-9f39fe8b916e" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.107-ssec.4-def.register" guid="_9e0807c0-8f2f-4009-8b15-4d5cc8ed4138" type="definition">register</defterm>, an instrument, means register the instrument under the <legref jurisd="QLD" type="act" check="unknown">Land Act</legref> or <legref jurisd="QLD" type="act" check="unknown">Land Title Act</legref>.</txt></definition><definition id="sec.107-ssec.4-def.useorpreservationcovenant_" guid="_b3f2898b-9c38-4160-99f7-5d8d37ecc3cc" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.107-ssec.4-def.useorpreservationcovenant" guid="_f4685730-cb77-4917-b614-af5503d55c8d" type="definition">use or preservation covenant</defterm> means a covenant under the <legref jurisd="QLD" type="act" check="unknown">Land Act</legref>, section 373A(4) or the <legref jurisd="QLD" type="act" check="unknown">Land Title Act</legref>, section 97A(3)(a) or (b).</txt></definition></deflist></block></subclause></clause><clause id="sec.108" guid="_549d5735-0075-4fae-ab02-16023b18d285" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>108</no><heading id="sec.108-he" guid="_c3662405-5814-44ff-b574-cd4ff1991073">Limitation of liability</heading><block status="uncommenced"><txt break.before="1">An assessment manager or responsible entity does not incur liability for making a decision that is consistent with a direction of the Minister, or action taken by the Minister, under chapter 2, part 3, division 3.</txt></block></clause><clause id="sec.109" guid="_e1e0a361-3de2-4835-bcbd-727708e013ad" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>109</no><heading id="sec.109-he" guid="_f8436773-87e3-4697-aae0-540d4f4cb99f">Refunding or waiving fees</heading><block status="uncommenced"><txt break.before="1">An assessment manager, referral agency or responsible entity may, but need not—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.109-para1.a" guid="_f8e41120-13ed-4db6-b29f-db3a2dfce552" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">refund all or part of a required fee; or</txt></block></li><li id="sec.109-para1.b" guid="_37b546e6-6ad2-4cd7-9560-742f2814b784" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">waive all or part of a required fee, in the circumstances prescribed by regulation.</txt></block></li></list></block></clause></part></chapter><chapter id="ch.4" guid="_3be1f22c-9040-4380-94d9-d491fbaa6bbc" status="uncommenced" affected.by.uncommenced="0"><no>Chapter 4</no><heading id="ch.4-he" guid="_85e7671b-54c0-48a4-8b3c-f4a4409597ac">Infrastructure</heading><part id="ch.4-pt.1" guid="_e9ac6f67-0d54-4392-a5f1-e6e6d8fcf2bf" status="uncommenced" affected.by.uncommenced="0"><no>Part 1</no><heading id="ch.4-pt.1-he" guid="_0f077e54-ac7b-40d0-b4da-9908a725269b">Introduction</heading><clause id="sec.110" guid="_cdb19b72-2309-4093-9768-e7e17da2995b" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>110</no><heading id="sec.110-he" guid="_c54d7f55-6ea7-424b-9e5c-530c233d326e">What chapter is about</heading><subclause id="sec.110-ssec.1" guid="_c8c2c2c8-549d-4cd7-9b95-689d0fadd76e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">Part 2—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.110-ssec.1-para1.a" guid="_07b2a96a-175f-4a9a-bac4-6b2633038583" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">authorises local governments to do either or both of the following for development approvals in relation to trunk infrastructure—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.110-ssec.1-para1.a-para2.i" guid="_bfff5d77-65e0-4bb0-80f1-837ab06059ff" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">adopt, by resolution, charges for development infrastructure and levy the charges;</txt></block></li><li id="sec.110-ssec.1-para1.a-para2.ii" guid="_050c03d8-d118-4531-8fe2-1430de902a7d" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">impose particular conditions about development infrastructure; and</txt></block></li></list></block></li><li id="sec.110-ssec.1-para1.b" guid="_0787dfa3-fa79-4a71-bdd3-608a24ea1e10" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">authorises local governments, for non-trunk infrastructure, to impose particular conditions about development infrastructure; and</txt></block></li><li id="sec.110-ssec.1-para1.c" guid="_0a151cbd-b02c-4beb-a2eb-d19c6b14e3c1" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">provides for a regulation to govern local government adopted charges and charges by distributor-retailers under the SEQ Water Act for trunk infrastructure.</txt></block></li></list></block></subclause><subclause id="sec.110-ssec.2" guid="_08265295-f605-4722-b556-dad63055e9eb" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">Part 3 authorises State infrastructure providers to impose particular conditions on development approvals about infrastructure.</txt></block></subclause><subclause id="sec.110-ssec.3" guid="_74c0c02b-cf6f-46a6-a97e-948f060a39c4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">Part 4 provides for agreements between public sector entities and others about infrastructure.</txt></block></subclause><subclause id="sec.110-ssec.4" guid="_3809a91d-1b2d-4384-8f65-7d97e0d2f170" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">Part 5 contains a miscellaneous provision.</txt></block></subclause></clause></part><part id="ch.4-pt.2" guid="_51310e45-e6cf-4901-945c-ff5793f10187" status="uncommenced" affected.by.uncommenced="0"><no>Part 2</no><heading id="ch.4-pt.2-he" guid="_f09c49b9-78ff-4a34-8fad-0509bc34862a">Provisions for local governments</heading><division id="ch.4-pt.2-div.1" guid="_9a76a791-1936-4bae-8099-e2b531392fb3" status="uncommenced" affected.by.uncommenced="0"><no>Division 1</no><heading id="ch.4-pt.2-div.1-he" guid="_a062ca8a-76e1-4f26-8a98-46cfc2779b58">Preliminary</heading><clause id="sec.111" guid="_b7919b27-bd79-4628-8367-ca59ab963409" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>111</no><heading id="sec.111-he" guid="_e56f322c-68f5-4fc2-9477-cb96e0f1a9dd">Application of part</heading><block status="uncommenced"><txt break.before="1">This part, other than section 112 and division 5, applies to a local government only if the local government’s planning scheme includes a LGIP.</txt></block></clause></division><division id="ch.4-pt.2-div.2" guid="_ab43ec39-6392-4773-824c-3421b9eee3d9" status="uncommenced" affected.by.uncommenced="0"><no>Division 2</no><heading id="ch.4-pt.2-div.2-he" guid="_6c9a69ca-91c4-4fe3-b517-13883da29883">Charges for trunk infrastructure</heading><subdivision id="ch.4-pt.2-div.2-sdiv.1" guid="_40bfb3ab-c7d6-43e3-9e0d-e0d727d9a827" status="uncommenced" affected.by.uncommenced="0"><no>Subdivision 1</no><heading id="ch.4-pt.2-div.2-sdiv.1-he" guid="_9a88e849-440c-4679-b503-14decffefeaf">Adopting charges</heading><clause id="sec.112" guid="_5324d002-b147-48be-8d5b-1f6df8982a6c" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>112</no><heading id="sec.112-he" guid="_627e3cf4-784c-468f-8535-f1db0e578f2d">Regulation prescribing charges</heading><subclause id="sec.112-ssec.1" guid="_019d94c2-05c2-4895-b90a-513726264a0d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A regulation may prescribe a maximum amount (the <defterm id="sec.112-def.prescribedamount" guid="_0f909745-78aa-422a-91ea-64904e39b79c" type="definition">prescribed amount</defterm>) for each adopted charge—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.112-ssec.1-para1.a" guid="_5461652f-f6bb-4b50-8d4b-5a4eb0fb59d1" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">under this chapter for providing trunk infrastructure in relation to development; or</txt></block></li><li id="sec.112-ssec.1-para1.b" guid="_c621bfd2-de90-4d72-9377-fc4bec12ad48" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">under the SEQ Water Act in relation to providing trunk infrastructure.</txt></block></li></list></block></subclause><subclause id="sec.112-ssec.2" guid="_a3a6fc4a-0294-4f4f-acd2-446e39333d01" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">A <defterm id="sec.112-def.maximumadoptedcharge" guid="_8f238b22-d194-4c79-acc1-c360a5c8cc80" type="definition">maximum adopted charge</defterm>, for a financial year, is the sum of—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.112-ssec.2-para1.a" guid="_7d9a978b-cbb6-4b4b-8717-e9cf9239f8be" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the prescribed amount at the start of the financial year; and</txt></block></li><li id="sec.112-ssec.2-para1.b" guid="_697ad8f2-8b9a-4bb2-9a3e-196e23e93d32" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">an amount equal to the prescribed amount multiplied by the sum of the percentage increases for each financial quarter since the prescribed amount was last prescribed or amended.</txt></block></li></list></block></subclause><subclause id="sec.112-ssec.3" guid="_fea72887-6970-4c8f-8610-40f34c738637" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The regulation may also prescribe—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.112-ssec.3-para1.a" guid="_183405ee-46bf-42cb-aee6-243ae9fbbf9e" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the charges breakup; and</txt></block></li><li id="sec.112-ssec.3-para1.b" guid="_de246a41-990a-4d49-b366-451fcb8242bc" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">development for which there may be an adopted charge under this chapter or land uses for which there may be an adopted charge under the SEQ Water Act for trunk infrastructure.</txt></block></li></list></block></subclause><subclause id="sec.112-ssec.4" guid="_69e61edd-7f61-4e51-aee0-35c402420e23" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.112-ssec.4-def.percentageincrease_" guid="_34ec188d-e2e1-4023-879a-4795a1c36a2c" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.112-ssec.4-def.percentageincrease" guid="_dbf8870b-efe7-4608-a417-82ae0fc5af13" type="definition">percentage increase</defterm> means the 3-yearly moving average quarterly percentage increase in the PPI.</txt></definition></deflist></block></subclause></clause><clause id="sec.113" guid="_18a05f85-72a4-481f-859d-ea1894ca54a4" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>113</no><heading id="sec.113-he" guid="_fe86c230-bde6-453a-b8b4-d7558af5fd23">Adopting charges by resolution</heading><subclause id="sec.113-ssec.1" guid="_0050ca41-00f7-4131-8ee6-e6d300a8ad79" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A local government may, by resolution (a <defterm id="sec.113-def.chargesresolution" guid="_257560b9-fc6d-49c0-af09-b3ae7d1966f7" type="definition">charges resolution</defterm>), adopt charges (each an <defterm id="sec.113-def.adoptedcharge" guid="_045412dd-d671-4ede-a822-2aaf5e0d7f89" type="definition">adopted charge</defterm>) for providing trunk infrastructure for development.</txt></block></subclause><subclause id="sec.113-ssec.2" guid="_e20b5617-662f-4535-868e-929118f8cbaa" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, a charges resolution does not, of itself, levy an adopted charge.</txt></block></subclause><subclause id="sec.113-ssec.3" guid="_a4a38e6e-89bf-4bf9-b113-93cf6f082b99" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">An adopted charge must not be for—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.113-ssec.3-para1.a" guid="_f12cf804-4c8f-45a2-b3b8-91e414267b62" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">works or use of premises authorised under the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Greenhouse Gas Storage Act 2009</name></legref>, the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Mineral Resources Act 1989</name></legref>, the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Petroleum Act 1923</name></legref> or the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Petroleum and Gas (Production and Safety) Act 2004</name></legref>; or</txt></block></li><li id="sec.113-ssec.3-para1.b" guid="_070cee46-0f15-44bd-b8d4-140e4c07498f" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">development in a priority development area under the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Economic Development Act 2012</name></legref>; or</txt></block></li><li id="sec.113-ssec.3-para1.c" guid="_c26cc341-b5ff-48d0-9020-9115d8ee66ef" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">development by a department, or part of a department, under a designation; or</txt></block></li><li id="sec.113-ssec.3-para1.d" guid="_4c3bffb3-914c-416d-8ba2-08b6391ecbb4" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">development for a non-State school under a designation.</txt></block></li></list></block></subclause><subclause id="sec.113-ssec.4" guid="_4092994e-e82f-41e7-8bd8-41aba99ba313" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">A charges resolution must state the day when an adopted charge under the resolution is to have effect.</txt></block></subclause><subclause id="sec.113-ssec.5" guid="_7bd6dcce-36e9-4aff-b9be-8d8c7a94f5f4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The making of a charges resolution is subject to this subdivision and subdivision 2.</txt></block></subclause><subclause id="sec.113-ssec.6" guid="_e03ff4c0-6bd3-416e-b45b-82677a2a1651" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.113-ssec.6-def.nonStateschool_" guid="_9bb0d24d-31f7-478f-afd0-4cc7836f6dc0" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.113-ssec.6-def.nonStateschool" guid="_770c7022-9685-421e-884c-034f33ce6223" type="definition">non-State school</defterm> see the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Education (Accreditation of Non-State Schools) Act 2001</name>, section 6.</legref></txt></definition></deflist></block></subclause></clause></subdivision><subdivision id="ch.4-pt.2-div.2-sdiv.2" guid="_c86ec871-3618-4459-96f9-ab03a7148794" status="uncommenced" affected.by.uncommenced="0"><no>Subdivision 2</no><heading id="ch.4-pt.2-div.2-sdiv.2-he" guid="_13d74f91-0e05-443b-8ec6-2dfec1307a44">Charges resolutions</heading><clause id="sec.114" guid="_bab15d67-2980-40e5-ab47-55b9c05f9620" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>114</no><heading id="sec.114-he" guid="_18105cc6-a9b9-44d8-8b61-42704b0526f3">Contents—general</heading><subclause id="sec.114-ssec.1" guid="_d0152059-b005-4908-9fe2-653f972d338a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">An adopted charge may be made for development if the charge is—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.114-ssec.1-para1.a" guid="_f3838ebd-f859-4746-a8f9-77d90cd735d8" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">prescribed by regulation for the development; and</txt></block></li><li id="sec.114-ssec.1-para1.b" guid="_822c0f08-0f18-4372-bff2-8d723dc3442d" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">no more than the maximum adopted charge for providing trunk infrastructure for the development.</txt></block></li></list></block></subclause><subclause id="sec.114-ssec.2" guid="_6971fe0d-41a0-4edb-b14e-b58f5fa53922" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">There may be different adopted charges for development in different parts of the local government’s area.</txt></block></subclause><subclause id="sec.114-ssec.3" guid="_22b60b7f-581d-49a2-8842-a0e7d45923d5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">Also, a charges resolution may—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.114-ssec.3-para1.a" guid="_7ee064e2-acc3-4286-bfd7-4703b3fee49a" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">declare there is no adopted charge for all or part of the local government’s area; or</txt></block></li><li id="sec.114-ssec.3-para1.b" guid="_084493cb-6fb0-4d34-b3de-dbf7474c8dac" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">include a provision (an <defterm id="sec.114-ssec.3-def.automaticincreaseprovision" guid="_89f14a96-0d4a-461a-a239-9d4703da327d" type="definition">automatic increase provision</defterm>) that provides for automatic increases in levied charges from when they are levied to when they are paid.</txt></block></li></list></block></subclause><subclause id="sec.114-ssec.4" guid="_bea62016-1fdb-45f1-bc07-beba575a5afe" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">An automatic increase provision must state how increases under the provision are to be worked out.</txt></block></subclause><subclause id="sec.114-ssec.5" guid="_08512862-62fb-442d-a529-c37b93f21cdd" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">However, an automatic increase must not be more than the lesser of the following—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.114-ssec.5-para1.a" guid="_9b980d69-553b-4beb-8c79-86dd21924194" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the difference between—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.114-ssec.5-para1.a-para2.i" guid="_0663cdfa-db5f-4934-9122-ce79d9c3ecf8" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the levied charge; and</txt></block></li><li id="sec.114-ssec.5-para1.a-para2.ii" guid="_d15a0bf3-3e92-434b-9cd4-874da002da49" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the maximum adopted charge that the local government could have levied for the development when the charge is paid;</txt></block></li></list></block></li><li id="sec.114-ssec.5-para1.b" guid="_8bf5f322-d5c6-4506-b957-99c653223276" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the increase worked out using the PPI, adjusted according to the 3-yearly PPI average, for the period—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.114-ssec.5-para1.b-para2.i" guid="_2f5e48d4-5a67-45c0-a085-f885db0b8b1b" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">starting on the day the levied charge is levied; and</txt></block></li><li id="sec.114-ssec.5-para1.b-para2.ii" guid="_ae1f5f72-e853-4b12-9de8-139fafe12bc9" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">ending on the day the charge is paid.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.114-ssec.6" guid="_6d06a9ab-bfcc-47ba-810b-b9c71bde0cd3" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.114-ssec.6-def.3yearlyPPIaverage_" guid="_ed832ee8-001f-4935-9f4c-cdf9162fd0f4" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.114-ssec.6-def.3yearlyPPIaverage" guid="_a3026720-7e7b-40aa-bba6-7395edd6d1b5" type="definition">3-yearly PPI average</defterm> means the PPI adjusted according to the 3-year moving average quarterly percentage change between financial quarters.</txt></definition></deflist></block></subclause></clause><clause id="sec.115" guid="_be7a12ab-ff96-4c0c-9bc6-58bcc71f681e" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>115</no><heading id="sec.115-he" guid="_b2fcfbf0-00f4-4c19-8a7f-6801d7f5b6f1">Provisions for participating local governments and distributor-retailers</heading><subclause id="sec.115-ssec.1" guid="_ab64b2e4-01fd-4f53-84e1-f2130ccd3b78" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to each of the following entities (the <defterm id="sec.115-def.parties" guid="_2f5bf89b-5249-4c91-bfe4-491f937af257" type="definition">parties</defterm>)—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.115-ssec.1-para1.a" guid="_aff1ce75-b3c5-460c-a597-e2abb80820bf" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a local government that is a participating local government for a distributor-retailer;</txt></block></li><li id="sec.115-ssec.1-para1.b" guid="_859a6745-c885-45ac-bd26-5ba1e57b0c27" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the distributor-retailer.</txt></block></li></list></block></subclause><subclause id="sec.115-ssec.2" guid="_b5936350-08d5-4326-9bb6-76e9d6f01dae" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The parties may enter into an agreement (a <defterm id="sec.115-def.breakupagreement" guid="_73acae0a-ed32-443d-9478-eb2a261835bb" type="definition">breakup agreement</defterm>) about the charges breakup.</txt></block></subclause><subclause id="sec.115-ssec.3" guid="_2c77b3a6-7084-4c31-b4bb-fd1373d81615" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">A breakup agreement applies instead of a charges breakup prescribed by regulation.</txt></block></subclause><subclause id="sec.115-ssec.4" guid="_e34a280f-1cfa-41a9-b5da-6af6604c56a5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">A charges resolution of the local government must state the charges breakup for all adopted charges under the resolution.</txt></block></subclause><subclause id="sec.115-ssec.5" guid="_dc6cc9aa-303e-4e17-b040-12b0e3ce91a6" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">However, the adopted charges must not be more than the proportion of the maximum adopted charges—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.115-ssec.5-para1.a" guid="_e86e5d57-9ef7-421b-b1f3-9b0a9be70bc4" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the local government may have under a breakup agreement to which the local government is a party; or</txt></block></li><li id="sec.115-ssec.5-para1.b" guid="_4ceb954a-ff54-4cdc-8619-3a7e17970097" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the local government is not a party to a breakup agreement—prescribed by regulation.</txt></block></li></list></block></subclause><subclause id="sec.115-ssec.6" guid="_67da64c9-c50f-4114-aab0-bc0a485d9452" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">Subsection (7) applies if there is a charges resolution of the local government and the parties later enter into a breakup agreement with a different charges breakup from the resolution.</txt></block></subclause><subclause id="sec.115-ssec.7" guid="_8e91736d-9604-4192-bb65-a8ba0fd0ea5a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">The breakup agreement does not have effect until the later of the following—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.115-ssec.7-para1.a" guid="_644e9abc-a691-41cb-9189-ae4506642fc0" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the local government makes a new charges resolution that reflects the agreement;</txt></block></li><li id="sec.115-ssec.7-para1.b" guid="_64cab627-2da4-4a52-983c-ccd9929c4dc3" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the distributor-retailer adopts a new infrastructure charges schedule that reflects the agreement.</txt></block></li></list></block></subclause></clause><clause id="sec.116" guid="_39caf4da-54dc-41b5-863f-b98b98dfbc21" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>116</no><heading id="sec.116-he" guid="_ab0173b6-89ae-4a31-8bf1-9b893ace4614">Working out cost of infrastructure for offset or refund</heading><subclause id="sec.116-ssec.1" guid="_94cbb359-6a5c-4fd0-ab63-68c699cd3287" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">For working out an offset or refund under this part, a charges resolution must include a method for working out the cost of the infrastructure that is the subject of the offset or refund.</txt></block></subclause><subclause id="sec.116-ssec.2" guid="_738b3551-47d5-43a0-8db7-3edf456fe311" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The method must be consistent with the parameters for the purpose provided for under a guideline made by the Minister and prescribed by regulation.</txt></block></subclause></clause><clause id="sec.117" guid="_7b32e82e-6d28-4e90-adbc-23c264334eef" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>117</no><heading id="sec.117-he" guid="_b1ba6d15-ad01-4110-b15b-623cc647da34">Criteria for deciding conversion application</heading><subclause id="sec.117-ssec.1" guid="_962c8c69-5889-470c-963f-264a502a5231" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A charges resolution must include criteria for deciding a conversion application.</txt></block></subclause><subclause id="sec.117-ssec.2" guid="_95cc98c4-36b0-4d64-b78c-0e4ba93fc202" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The criteria must be consistent with parameters for the criteria provided for under a guideline made by the Minister and prescribed by regulation.</txt></block></subclause></clause><clause id="sec.118" guid="_6940de96-59a4-4b46-8a04-45c0e57a860f" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>118</no><heading id="sec.118-he" guid="_6c2c7336-58fb-4ae2-b715-289fdbccbdf6">Steps after making charges resolution</heading><subclause id="sec.118-ssec.1" guid="_60e71655-7d2f-428c-beb0-e3ed9a66f06e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">After making a charges resolution, a local government must—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.118-ssec.1-para1.a" guid="_41055966-d866-401d-944e-4192a7cb5f48" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">upload and keep the resolution on the local government’s website; and</txt></block></li><li id="sec.118-ssec.1-para1.b" guid="_c3f49f81-e231-48e6-a7f4-f9d31ff42c11" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">attach the resolution to each copy of the planning scheme that the local government gives to, or publishes for, others.</txt><note id="sec.118-ssec.1-para1.b-note" guid="_a30bb85d-6be4-4cc8-8db7-0ebcb946cb26" type="example"><heading id="sec.118-ssec.1-para1.b-note-he" guid="_5767ac96-3475-445e-aeac-412676f65fd5">Note—</heading><block status="uncommenced"><txt break.before="1">A charges resolution is not part of a planning scheme even if the resolution is attached to the scheme.</txt></block></note></block></li></list></block></subclause><subclause id="sec.118-ssec.2" guid="_d2ddeb20-38b5-4a5f-85f0-32d51d93c2b2" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The charges under the charges resolution have effect—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.118-ssec.2-para1.a" guid="_8b73a2a1-99d6-478c-be3a-a831811d1c99" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if the charges resolution is uploaded on the relevant local government website before the beginning of the day stated in the resolution as the day for the charges to have effect—on the day stated in the resolution; or</txt></block></li><li id="sec.118-ssec.2-para1.b" guid="_577ce1cc-80fd-4d57-8ec1-73eefc3c9e5d" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">otherwise—on the day the charges resolution is uploaded on the website.</txt></block></li></list></block></subclause></clause></subdivision><subdivision id="ch.4-pt.2-div.2-sdiv.3" guid="_561f2682-7689-426b-a9a5-0d0e61d8e8d3" status="uncommenced" affected.by.uncommenced="0"><no>Subdivision 3</no><heading id="ch.4-pt.2-div.2-sdiv.3-he" guid="_7b4945c7-0401-4f51-adcf-09d3cc36d550">Levying charges</heading><clause id="sec.119" guid="_7c33aac7-c582-4550-bb21-a70ae92483f9" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>119</no><heading id="sec.119-he" guid="_bb2bf73f-7396-4ef1-aa30-07ad6f8131dd">When charge may be levied and recovered</heading><subclause id="sec.119-ssec.1" guid="_3bf1f865-9fb7-4734-b980-46537db644a7" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.119-ssec.1-para1.a" guid="_3104f948-1f00-41a7-958a-9cb7c7975707" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a development approval has been given; and</txt></block></li><li id="sec.119-ssec.1-para1.b" guid="_e044db02-4d1d-4a86-accf-860122bad767" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">an adopted charge applies to providing trunk infrastructure for the development.</txt></block></li></list></block></subclause><subclause id="sec.119-ssec.2" guid="_5fe02b5e-b485-42a5-806b-41799ac639d5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The local government must give a notice (an <defterm id="sec.119-def.infrastructurechargesnotice" guid="_aa232664-0e56-43ba-8529-2b171906cfc9" type="definition">infrastructure charges notice</defterm>) to the applicant.</txt><note id="sec.119-ssec.2-note" guid="_63c07dea-b4ec-4ad1-a0c1-d47a10212b07" type="example"><heading id="sec.119-ssec.2-note-he" guid="_44bcf27c-0052-4e49-bbac-29954317d4b2">Note—</heading><block status="uncommenced"><txt break.before="1">For when a local government may give a replacement infrastructure charges notice for a negotiated decision notice, see section 76(6).</txt></block></note></block></subclause><subclause id="sec.119-ssec.3" guid="_3f9cce44-ac58-4e59-979b-0bb526a2bf5a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The local government must give the infrastructure charges notice—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.119-ssec.3-para1.a" guid="_3cd54141-3dd1-43a5-9827-375daad454d7" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if the local government is the assessment manager—at the same time as, or as soon as practicable after, the development approval is given; or</txt></block></li><li id="sec.119-ssec.3-para1.b" guid="_9386df25-e1ff-4bf9-9e4b-717d32ab07ce" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the local government is a referral agency—within 10 business days after the local government receives a copy of the development approval; or</txt></block></li><li id="sec.119-ssec.3-para1.c" guid="_e9acf029-b28a-4ae0-8950-ca76d75cda95" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">if the development approval is a deemed approval for which a decision notice has not been given—within 20 business days after the local government receives a copy of the deemed approval notice; or</txt></block></li><li id="sec.119-ssec.3-para1.d" guid="_1cf41005-dda8-4b10-b20f-e0f67e765fd0" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">if paragraphs (a) to (c) do not apply—within 20 business days after the local government receives a copy of the development approval.</txt></block></li></list></block></subclause><subclause id="sec.119-ssec.4" guid="_d7fe68fd-1640-4a93-9fde-0432c6318f0d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">Subsection (3) is subject to subsection (8), and any other provision under which an infrastructure charges notice may be amended or replaced.</txt></block></subclause><subclause id="sec.119-ssec.5" guid="_2cae11ae-1e69-450a-90df-dfc546ad9c85" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The local government must give an infrastructure charges notice to the applicant for a change application or extension application if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.119-ssec.5-para1.a" guid="_08f11412-1ba8-4e34-ba38-93ad2124f191" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">an approval is given for the application; and</txt></block></li><li id="sec.119-ssec.5-para1.b" guid="_f20e8d14-2c03-4146-b796-1576cc4b4ca6" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">subsection (1)(b) did not apply for the development approval to which the application relates, but applies because of the change or extension.</txt></block></li></list></block></subclause><subclause id="sec.119-ssec.6" guid="_282b1552-f6ac-42a0-a2e0-5aac1b17ec73" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">If an approval is given for a change application or extension application related to a development approval for which an infrastructure charges notice has been given, the local government may give an amended infrastructure charges notice to the applicant.</txt></block></subclause><subclause id="sec.119-ssec.7" guid="_571b68f6-1d1f-4506-952d-dbccedd7cfa7" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">However, an infrastructure charges notice may be given or amended under subsection (5) or (6) only if the notice or amendment relates to the change to, or extension of, the development approval.</txt></block></subclause><subclause id="sec.119-ssec.8" guid="_0fe8a106-711b-4c78-862b-67945d9aa768" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(8)</no><block status="uncommenced"><txt break.before="1">The local government must give the infrastructure charges notice or amended infrastructure charges notice under subsection (5) or (6)—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.119-ssec.8-para1.a" guid="_736a5089-824a-44a5-9ffc-efb00e4fd049" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if the local government is the assessment manager or responsible entity—at the same time as, or as soon as practicable after, the approval is given; or</txt></block></li><li id="sec.119-ssec.8-para1.b" guid="_8e0575b6-e191-4a56-95e1-28db75fa2a9d" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">otherwise—within 20 business days after the local government receives a copy of the approval.</txt></block></li></list></block></subclause><subclause id="sec.119-ssec.9" guid="_72a57941-e2a0-4250-80cf-c283c460eee3" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(9)</no><block status="uncommenced"><txt break.before="1">The amended infrastructure charges notice replaces the infrastructure charges notice.</txt></block></subclause><subclause id="sec.119-ssec.10" guid="_6b75a681-f49c-41e9-a5ba-fa001cd8e92b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(10)</no><block status="uncommenced"><txt break.before="1">A reference in this Act to an infrastructure charges notice includes a reference to an amended infrastructure charges notice.</txt></block></subclause><subclause id="sec.119-ssec.11" guid="_800ae99e-7949-41c1-9ceb-3d570710c0c9" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(11)</no><block status="uncommenced"><txt break.before="1">An infrastructure charges notice stops having effect to the extent the development approval stops having effect.</txt></block></subclause><subclause id="sec.119-ssec.12" guid="_9e16bc07-6209-49f3-a9a6-b9b874a2b138" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(12)</no><block status="uncommenced"><txt break.before="1">A charge (a <defterm id="sec.119-def.leviedcharge" guid="_697de91f-c4f8-405a-91df-f785d1bc5195" type="definition">levied charge</defterm>) under an infrastructure charges notice—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.119-ssec.12-para1.a" guid="_30fec1a7-1279-47a3-b407-4b586c060ef9" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">is subject to sections 120 and 129; and</txt></block></li><li id="sec.119-ssec.12-para1.b" guid="_dd06a8b7-74ac-44ea-abec-c5eae86dda3b" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">is payable by the applicant; and</txt></block></li><li id="sec.119-ssec.12-para1.c" guid="_9e9d1442-6a60-48ed-a14d-ddb3174c4b98" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">attaches to the premises; and</txt></block></li><li id="sec.119-ssec.12-para1.d" guid="_3a9881c5-aecf-454b-8bab-5b227636cba8" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">becomes payable as provided for under subdivision 4; and</txt></block></li><li id="sec.119-ssec.12-para1.e" guid="_740b0831-99d5-4f29-b842-f32082bccd01" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">is subject to an agreement under section 123(1).</txt></block></li></list></block></subclause></clause><clause id="sec.120" guid="_32449434-074f-4d45-80c1-e0bfb068ae63" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>120</no><heading id="sec.120-he" guid="_9aa8c96f-2d10-4ad3-980c-4dfcb31ad8e0">Limitation of levied charge</heading><subclause id="sec.120-ssec.1" guid="_1e411c6a-d0f3-4ec1-900b-8f9352bf4508" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A levied charge may be only for extra demand placed on trunk infrastructure that the development will generate.</txt></block></subclause><subclause id="sec.120-ssec.2" guid="_866bbeb0-4a7d-4d9e-a66f-18450b4323a1" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">When working out extra demand, the demand on trunk infrastructure generated by the following must not be included—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.120-ssec.2-para1.a" guid="_26a03c74-61d8-437e-ba88-47270773e6f0" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">an existing use on the premises if the use is lawful and already taking place on the premises;</txt></block></li><li id="sec.120-ssec.2-para1.b" guid="_b09586ce-f8de-415a-8b1d-74f175bf3044" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a previous use that is no longer taking place on the premises if the use was lawful at the time the use was carried out;</txt></block></li><li id="sec.120-ssec.2-para1.c" guid="_8bd95eeb-8fbd-453d-b693-759b8713ff70" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">other development on the premises if the development may be lawfully carried out without the need for a further development permit.</txt></block></li></list></block></subclause><subclause id="sec.120-ssec.3" guid="_c2f0eee1-1f74-41b0-a61d-ed12660fe2bd" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">However—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.120-ssec.3-para1.a" guid="_4ded4c30-78b6-41c9-a324-d21caf9b3569" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the demand generated by a use or development stated in subsection (2) may be included if an infrastructure requirement that applies, or applied to the use or development, has not been complied with; and</txt></block></li><li id="sec.120-ssec.3-para1.b" guid="_8b4fee66-9999-4d52-b1f6-2985bf2ebfe5" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the demand generated by development stated in subsection (2)(c) may be included if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.120-ssec.3-para1.b-para2.i" guid="_df69e2e4-e409-49c1-a610-ef68ad68ab6b" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">an infrastructure requirement applies to the premises on which the development will be carried out; and</txt></block></li><li id="sec.120-ssec.3-para1.b-para2.ii" guid="_30faca8c-a147-4dcc-b4b6-c264dda5f167" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the infrastructure requirement was imposed on the basis of development of a lower scale or intensity being carried out on the premises.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.120-ssec.4" guid="_e94acd24-841e-4cec-bc40-195c99935122" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.120-ssec.4-def.chargesnotice_" guid="_e51560db-4847-4c0f-b0b6-9318194d5570" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.120-ssec.4-def.chargesnotice" guid="_e0608cb6-00ff-4f60-9b75-62c1c4ba4a73" type="definition">charges notice</defterm> means—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.120-ssec.4-def.chargesnotice-para1.a" guid="_761d756c-054c-4eb8-a338-f0eab1aff2ee" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">	an infrastructure charges notice; or</txt></block></li><li id="sec.120-ssec.4-def.chargesnotice-para1.b" guid="_4e92997b-275a-4dba-9594-1aad2a479aea" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a notice stated in section 125(3).</txt></block></li></list></definition><definition id="sec.120-ssec.4-def.infrastructurerequirement_" guid="_bce3a5c0-5276-4fa9-ad4f-0f5b80e2405f" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.120-ssec.4-def.infrastructurerequirement" guid="_aa000d42-29d0-4a24-ba08-03cd07f1aafb" type="definition">infrastructure requirement</defterm> means a charges notice, or a condition of a development approval, that requires infrastructure or a payment in relation to demand on trunk infrastructure.</txt></definition></deflist></block></subclause></clause><clause id="sec.121" guid="_6c9dbb19-0d87-4552-b9cd-d0d749a2acb9" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>121</no><heading id="sec.121-he" guid="_e49edcee-f3cb-4360-b238-ce47c5226ff7">Requirements for infrastructure charges notice</heading><subclause id="sec.121-ssec.1" guid="_5cb975e8-6967-4bb4-b692-7fcd753c4d8b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">An infrastructure charges notice must state all of the following for the levied charge—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.121-ssec.1-para1.a" guid="_ca4071d4-e7a4-4632-b78f-f68de11682e1" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the current amount of the charge;</txt></block></li><li id="sec.121-ssec.1-para1.b" guid="_cb066d71-5838-489e-ae90-ad21b6cf3e47" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">how the charge has been worked out;</txt></block></li><li id="sec.121-ssec.1-para1.c" guid="_e1e1814f-5cb8-4a99-835c-1fc8003e2a0d" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the premises;</txt></block></li><li id="sec.121-ssec.1-para1.d" guid="_1c3813cd-69ae-42e7-a5c2-240b229d0d10" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">when the charge will be payable under section 122;</txt></block></li><li id="sec.121-ssec.1-para1.e" guid="_187ddba5-b22d-4ceb-9261-05f25b902fff" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">if an automatic increase provision applies—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.121-ssec.1-para1.e-para2.i" guid="_70553aff-31f4-424f-a01a-5237c4332450" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">that the charge is subject to automatic increases; and</txt></block></li><li id="sec.121-ssec.1-para1.e-para2.ii" guid="_0d1bf724-e92e-442a-89f7-403bc73acd52" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">how the increases are worked out under the provision;</txt></block></li></list></block></li><li id="sec.121-ssec.1-para1.f" guid="_b5336a9a-8476-4b80-9b4f-bcadeb9740c2" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">whether an offset or refund under this part applies and, if so, information about the offset or refund, including when the refund will be given.</txt></block></li></list></block></subclause><subclause id="sec.121-ssec.2" guid="_c63fc5ae-b566-473c-8738-020bd61dbc2a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, the infrastructure charges notice need not include the information stated in subsection (1)(f) if the person who is to receive the notice has advised, in writing (including in any approved form), that the information need not be included in the notice.</txt></block></subclause><subclause id="sec.121-ssec.3" guid="_a59ec197-d9f3-428d-84cf-fc4bf0603906" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The infrastructure charges notice must also include, or be accompanied by, a decision notice about the decision to give the notice.</txt></block></subclause></clause></subdivision><subdivision id="ch.4-pt.2-div.2-sdiv.4" guid="_8cdb385d-db75-4720-be64-b58f1a54f794" status="uncommenced" affected.by.uncommenced="0"><no>Subdivision 4</no><heading id="ch.4-pt.2-div.2-sdiv.4-he" guid="_845f96a5-0181-4250-950d-0d5bd9658352">Payment</heading><clause id="sec.122" guid="_ac66c4e2-eae3-4253-b303-6f6d9761def7" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>122</no><heading id="sec.122-he" guid="_ba2af6d1-e636-4198-93a3-9bd94c5663ce">Payment triggers generally</heading><subclause id="sec.122-ssec.1" guid="_2fda8fc3-33a6-4499-950d-6f3e600a08cd" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A levied charge becomes payable—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.122-ssec.1-para1.a" guid="_aa7b3887-a353-43b8-b994-d3f50ac56ba3" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if the charge applies for reconfiguring a lot—when the local government that levied the charge approves a plan for the reconfiguration that, under the Land Title Act, is required to be given to the local government for approval; or</txt></block></li><li id="sec.122-ssec.1-para1.b" guid="_43516c5f-4083-4452-8cb0-d031bb091f01" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">	if the charge applies for building work—when the final inspection certificate for the building work, or the certificate of classification for the building, is given under the Building Act; or</txt></block></li><li id="sec.122-ssec.1-para1.c" guid="_75437311-17fd-48b2-8005-f5439baed783" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">if the charge applies for a material change of use—when the change happens; or</txt></block></li><li id="sec.122-ssec.1-para1.d" guid="_a1f25255-477b-4646-899f-66cfa99ab9a1" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">if the charge applies for other development—on the day stated in the infrastructure charges notice under which the charge is levied.</txt></block></li></list></block></subclause><subclause id="sec.122-ssec.2" guid="_69b068ac-0619-46d5-8e1a-1431b67ab4b9" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">This section is subject to section 123.</txt></block></subclause></clause><clause id="sec.123" guid="_921223f9-20b1-4186-a5d7-78af7b1da41d" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>123</no><heading id="sec.123-he" guid="_64394513-ba16-433e-b826-498d69d945b5">Agreements about payment or provision instead of payment</heading><subclause id="sec.123-ssec.1" guid="_b0b5b7fe-d073-4626-a0a3-e800db95b04e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The recipient of an infrastructure charges notice and the local government that gave the notice may agree about either or both of the following—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.123-ssec.1-para1.a" guid="_b774729a-bfb8-4c70-8681-0e5ff758f4d6" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">whether the levied charge under the notice may be paid other than as required under section 122 including whether the charge may be paid by instalments;</txt></block></li><li id="sec.123-ssec.1-para1.b" guid="_3b551b56-653e-4951-b353-7071884ea411" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">whether infrastructure may be provided instead of paying all or part of the levied charge.</txt></block></li></list></block></subclause><subclause id="sec.123-ssec.2" guid="_2ba0302a-045a-47f6-ac16-d7ed7d24fe19" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">If the levied charge is subject to an automatic increase provision, the agreement must state how increases in the charge are payable under the agreement.</txt></block></subclause></clause></subdivision><subdivision id="ch.4-pt.2-div.2-sdiv.5" guid="_2efc398a-a888-46e2-96b3-9995bc6b04b6" status="uncommenced" affected.by.uncommenced="0"><no>Subdivision 5</no><heading id="ch.4-pt.2-div.2-sdiv.5-he" guid="_ac29d043-33e9-4d98-8ff7-902ee1d9c183">Changing charges during relevant appeal period</heading><clause id="sec.124" guid="_6b775bf4-0935-4db7-a026-4bd855fa0295" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>124</no><heading id="sec.124-he" guid="_4da2decf-923e-4771-89e4-840ff9636d19">Application of this subdivision</heading><block status="uncommenced"><txt break.before="1">This subdivision applies to the recipient of an infrastructure charges notice given by a local government.</txt></block></clause><clause id="sec.125" guid="_1265175c-6b1b-4b4a-ac75-8aa4d4ff5775" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>125</no><heading id="sec.125-he" guid="_9f9117c7-9099-4e9b-a7ca-6752977ecdc5">Representations about infrastructure charges notice</heading><subclause id="sec.125-ssec.1" guid="_094928cc-f21c-4ef4-ae9c-740bbec2182b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">During the appeal period for the infrastructure charges notice, the recipient may make representations to the local government about the infrastructure charges notice.</txt></block></subclause><subclause id="sec.125-ssec.2" guid="_75e2a77d-5759-4b2d-84f3-e7a12ca64ada" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The local government must consider the representations.</txt></block></subclause><subclause id="sec.125-ssec.3" guid="_6ebfb4c7-f1c4-41ef-bd7f-28fb114d6048" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">If the local government—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.125-ssec.3-para1.a" guid="_50484d92-3b8e-46c8-ad39-d5fe264a469e" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">agrees with a representation; and</txt></block></li><li id="sec.125-ssec.3-para1.b" guid="_743a80ec-e4aa-4554-a38c-2c2e11f4229e" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">decides to change the infrastructure charges notice;</txt></block></li></list><txt break.before="1">the local government must, within 10 business days after making the decision, give a new infrastructure charges notice (a <defterm id="sec.125-def.negotiatednotice" guid="_761f156d-0a7e-42c1-8fe4-e729dce42635" type="definition">negotiated notice</defterm>) to the recipient.</txt></block></subclause><subclause id="sec.125-ssec.4" guid="_d326c932-bb95-4dd1-b088-a2710c784648" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The local government may give only 1 negotiated notice.</txt></block></subclause><subclause id="sec.125-ssec.5" guid="_4cf97659-6b84-4ff2-9777-18d7350cffb6" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">A negotiated notice—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.125-ssec.5-para1.a" guid="_80562dbb-42d4-4096-a380-e7098c2b0258" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">must be in the same form as the infrastructure charges notice; and</txt></block></li><li id="sec.125-ssec.5-para1.b" guid="_37b60818-9c8e-4e6d-8f67-0f2b3cf5c2b3" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">must state the nature of the changes; and</txt></block></li><li id="sec.125-ssec.5-para1.c" guid="_25b159c9-6f9d-47b1-afe0-85c23add707a" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">replaces the infrastructure charges notice.</txt></block></li></list></block></subclause><subclause id="sec.125-ssec.6" guid="_db4083eb-ea70-4019-8fa4-8f0f466fb1f0" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">If the local government does not agree with any of the representations, the local government must, within 10 business days after making the decision, give a decision notice about the decision to the recipient.</txt></block></subclause><subclause id="sec.125-ssec.7" guid="_52342c7f-3b4f-4350-9a86-be918f8f99bf" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">The appeal period for the infrastructure charges notice starts again when the local government gives the decision notice to the recipient.</txt></block></subclause></clause><clause id="sec.126" guid="_0e85da35-1821-4711-bd72-4c55a5fc3f43" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>126</no><heading id="sec.126-he" guid="_e1ce05d3-52c1-485c-ace5-73be82c40a47">Suspending relevant appeal period</heading><subclause id="sec.126-ssec.1" guid="_52cc5d33-3181-4d04-a098-e07a4a62f738" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">If the recipient needs more time to make representations, the recipient may give a notice suspending the relevant appeal period to the local government.</txt></block></subclause><subclause id="sec.126-ssec.2" guid="_8bfe1f55-16b8-40e9-8f36-0ca8a885b087" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The recipient may give only 1 notice.</txt></block></subclause><subclause id="sec.126-ssec.3" guid="_18b2f651-5792-4fed-b668-4d98ee8fd168" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">If the representations are not made within 20 business days after the notice is given, the balance of the relevant appeal period restarts.</txt></block></subclause><subclause id="sec.126-ssec.4" guid="_21ceb166-b017-4db6-ad49-f72df0f73487" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">If representations are made within the 20 business days and the recipient gives the local government a notice withdrawing the notice of suspension, the balance of the relevant appeal period restarts the day after the local government receives the notice of withdrawal.</txt></block></subclause></clause></subdivision></division><division id="ch.4-pt.2-div.3" guid="_df5651b9-4298-4e78-a014-3ab4b5906087" status="uncommenced" affected.by.uncommenced="0"><no>Division 3</no><heading id="ch.4-pt.2-div.3-he" guid="_6c4f984d-dee2-4541-bf4b-49702e4ef3ab">Development approval conditions about trunk infrastructure</heading><subdivision id="ch.4-pt.2-div.3-sdiv.1" guid="_b84973ca-e303-4694-99bb-809288783c2a" status="uncommenced" affected.by.uncommenced="0"><no>Subdivision 1</no><heading id="ch.4-pt.2-div.3-sdiv.1-he" guid="_59e981b8-2eb2-4f11-95a5-42e39d9f490d">Conditions for necessary trunk infrastructure</heading><clause id="sec.127" guid="_18a7aa58-1750-4205-8980-4cab1a31bef7" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>127</no><heading id="sec.127-he" guid="_77102155-76ee-4017-8320-6b481bfeae07">Application and operation of subdivision</heading><subclause id="sec.127-ssec.1" guid="_0adfa0e8-de22-47c0-b42d-151231964e4b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This subdivision applies if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.127-ssec.1-para1.a" guid="_97377271-1a2e-47fc-a9e2-2e878bad6e14" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">trunk infrastructure—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.127-ssec.1-para1.a-para2.i" guid="_b418511e-8229-4aad-907e-c02ee2853be8" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">has not been provided; or</txt></block></li><li id="sec.127-ssec.1-para1.a-para2.ii" guid="_c3d7ae95-3ce7-477f-820d-52aae51ba26d" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">has been provided but is not adequate; and</txt></block></li></list></block></li><li id="sec.127-ssec.1-para1.b" guid="_94297e8f-8fa1-4c25-9160-1ff66029e2d5" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the trunk infrastructure is or will be located on—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.127-ssec.1-para1.b-para2.i" guid="_1c4903db-9495-41d0-b9cd-774a5b6de806" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">premises (the <defterm id="sec.127-ssec.1-para1.b-def.subjectpremises" guid="_96d9a8f5-cc12-44ca-bbcf-cc56adea8178" type="definition">subject premises</defterm>) that are the subject of a development application, whether or not the infrastructure is necessary to service the subject premises; or</txt></block></li><li id="sec.127-ssec.1-para1.b-para2.ii" guid="_b4fe7136-f8b8-4182-a579-ed91b62155b2" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">other premises, but is necessary to service the subject premises.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.127-ssec.2" guid="_b1ab0002-9038-44c1-97fb-ae036ddfad03" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">Section 128 provides for the local government to be able to impose particular development conditions (each a <defterm id="sec.127-def.necessaryinfrastructurecondition" guid="_1cc660c5-5240-4f8f-ac90-3b0cd6569439" type="definition">necessary infrastructure condition</defterm>) on the development approval.</txt><note id="sec.127-ssec.2-note" guid="_20bce48a-13ac-45e1-ba74-cb131392b220" type="example"><heading id="sec.127-ssec.2-note-he" guid="_65384300-a6be-4a4d-898b-37fbf42c51e1">Note—</heading><block status="uncommenced"><txt break.before="1">For imposing or amending development conditions in relation to an approval of a change application, see sections 81(4)(a) and 82(3)(b).</txt></block></note></block></subclause></clause><clause id="sec.128" guid="_3ff5e08e-7dc1-4673-84c3-8834146763df" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>128</no><heading id="sec.128-he" guid="_1c0a569e-8f70-45dd-9223-43d152555188">Necessary infrastructure conditions</heading><subclause id="sec.128-ssec.1" guid="_ad12f63f-178a-459c-9ab3-ae1b765cdab1" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">If the LGIP identifies adequate trunk infrastructure to service the subject premises, the local government may impose a development condition requiring either or both of the following to be provided at a stated time—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.128-ssec.1-para1.a" guid="_df4c2a83-09a5-4efd-9248-6258c3f40c3b" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the identified infrastructure;</txt></block></li><li id="sec.128-ssec.1-para1.b" guid="_fe3d65f9-121e-4e4f-a105-56b2588e393e" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">different trunk infrastructure delivering the same desired standard of service.</txt></block></li></list></block></subclause><subclause id="sec.128-ssec.2" guid="_5a37fa62-638b-4666-97af-316d92a7174a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">If the LGIP does not identify adequate trunk infrastructure to service the subject premises, the local government may impose a development condition requiring development infrastructure necessary to service the premises to be provided at a stated time.</txt></block></subclause><subclause id="sec.128-ssec.3" guid="_0be2906c-8151-4575-ab0e-92c6bb2d8c82" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">However, a local government may impose a condition under subsection (2) only if the development infrastructure services development consistent with the assumptions in the LGIP about type, scale, location or timing of development.</txt></block></subclause><subclause id="sec.128-ssec.4" guid="_e8e52dd9-a1f5-43f8-86eb-b7a86ced34b8" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">A necessary infrastructure condition is taken to comply with section 65(1) if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.128-ssec.4-para1.a" guid="_5cc8627c-e121-4f0a-beb9-b341a955b0e9" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">generally, the infrastructure required is the most efficient and cost-effective solution for servicing other premises in the general area of the subject premises; and</txt></block></li><li id="sec.128-ssec.4-para1.b" guid="_7688a8bd-72af-482f-b6a7-2c1f6ab51884" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for a necessary infrastructure condition that requires the provision of the infrastructure located on the subject premises—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.128-ssec.4-para1.b-para2.i" guid="_e750d705-3b6a-4441-9add-2cf23aa584f2" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the provision is not an unreasonable imposition on the development; or</txt></block></li><li id="sec.128-ssec.4-para1.b-para2.ii" guid="_ccc038ef-335c-45ce-a972-19615f46b090" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the provision is not an unreasonable imposition on the use of the subject premises as a consequence of the development.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.128-ssec.5" guid="_4b27ca6c-794e-4a55-92a1-3541fc052cb5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">To remove any doubt, it is declared that a necessary infrastructure condition may be imposed for infrastructure even if the infrastructure will service premises other than the subject premises.</txt></block></subclause></clause><clause id="sec.129" guid="_ceeddb5a-0868-4573-9c71-eab76d7ef302" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>129</no><heading id="sec.129-he" guid="_6247b408-f181-4d3b-a845-36e17455c6b7">Offset or refund requirements</heading><subclause id="sec.129-ssec.1" guid="_e0d97ae8-90a9-4704-854d-b45c5ffdc233" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.129-ssec.1-para1.a" guid="_5aca9de2-aa60-4ae3-a580-11b00f58914f" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">trunk infrastructure that is the subject of a necessary infrastructure condition services, or is planned to service, premises other than the subject premises; and</txt></block></li><li id="sec.129-ssec.1-para1.b" guid="_0b7a19d5-4f8a-4c4b-8e2e-58df17afaa82" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">an adopted charge applies to the development.</txt></block></li></list></block></subclause><subclause id="sec.129-ssec.2" guid="_e0dbdb79-1804-4518-9d47-b5d91d2b3f2b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">If the cost of the infrastructure required to be provided under the condition is equal to or less than the amount worked out by applying the adopted charge to the development, the cost must be offset against that amount.</txt><note id="sec.129-ssec.2-note" guid="_1a67b573-a9bc-4e6a-b756-9d94680b8a06" type="example"><heading id="sec.129-ssec.2-note-he" guid="_494b2d19-df9c-4293-bf7c-b93b7b55add1">Note—</heading><block status="uncommenced"><txt break.before="1">For how the cost is worked out, see sections 116 and 137.</txt></block></note><note id="sec.129-ssec.2-note-oc.2" guid="_e84df248-920c-4026-8c94-950ba4207587" type="example"><heading id="sec.129-ssec.2-note-oc.2-he" guid="_c95e85e7-cf18-4801-b970-9c65e9f80760">Example—</heading><block status="uncommenced"><txt break.before="1">A necessary infrastructure condition of a development approval requires transport infrastructure to be provided. The cost of the transport infrastructure is $500,000. Adopted charges apply to the development at a total amount of $600,000. The cost of the infrastructure under the necessary infrastructure condition ($500,000) must be offset against the total amount worked out by applying the adopted charge to the development ($600,000), rather than offsetting it only against the part of the charge relating to transport infrastructure.</txt></block></note></block></subclause><subclause id="sec.129-ssec.3" guid="_c827ec07-9019-4d8b-89e5-2c969977f7dd" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">If the cost of the infrastructure required to be provided under the condition is more than the amount worked out by applying the adopted charge to the development—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.129-ssec.3-para1.a" guid="_dba306f6-8bc9-4bda-a986-1348ac89712c" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">no amount is payable for the development approval; and</txt></block></li><li id="sec.129-ssec.3-para1.b" guid="_fa9d98a6-b87d-4fdd-b6f7-8a91a3f31d26" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the local government must refund to the applicant the difference between the establishment cost of the trunk infrastructure and the amount worked out by applying the adopted charge to the development.</txt></block></li></list></block></subclause></clause></subdivision><subdivision id="ch.4-pt.2-div.3-sdiv.2" guid="_e6b276b6-7164-44a5-94dc-2943128e0a71" status="uncommenced" affected.by.uncommenced="0"><no>Subdivision 2</no><heading id="ch.4-pt.2-div.3-sdiv.2-he" guid="_06cc8dfb-9a40-42aa-9e43-5fa2f8473529">Conditions for extra trunk infrastructure costs</heading><clause id="sec.130" guid="_7f281277-19b0-4140-84fe-d1d772b39d68" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>130</no><heading id="sec.130-he" guid="_a9a203dc-750f-4f11-8624-1865a52342eb">Imposing development conditions</heading><subclause id="sec.130-ssec.1" guid="_6c1407c3-0983-4418-9874-a8f5a2690dc6" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A local government may impose a development condition (an <defterm id="sec.130-def.extrapaymentcondition" guid="_970e75fb-fdc2-4b0b-91b5-1e71309c0af2" type="definition">extra payment condition</defterm>) requiring the payment of extra trunk infrastructure costs if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.130-ssec.1-para1.a" guid="_a3da3242-3caf-470a-bc2f-82bad7efdd0d" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the development—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.130-ssec.1-para1.a-para2.i" guid="_6ae5f95b-eff2-45c1-9585-98e3a9afe720" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">will generate infrastructure demand of more than that required to service the type or scale of future development that the LGIP assumes; or</txt></block></li><li id="sec.130-ssec.1-para1.a-para2.ii" guid="_b1c1adf2-ecb0-4803-91b8-e07b75e77991" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">will require new trunk infrastructure earlier than when identified in the LGIP; or</txt></block></li><li id="sec.130-ssec.1-para1.a-para2.iii" guid="_a973a0a9-1725-4eb8-b85b-fcc26ad3c603" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">is for premises completely or partly outside the PIA; and</txt></block></li></list></block></li><li id="sec.130-ssec.1-para1.b" guid="_59acd0f2-2ebc-405d-b958-45aa3d1b7b6b" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the development would impose extra trunk infrastructure costs on the local government after taking into account either or both of the following—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.130-ssec.1-para1.b-para2.i" guid="_d42e9bd0-3d94-40a3-8892-cb5eed06faf2" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">levied charges for the development;</txt></block></li><li id="sec.130-ssec.1-para1.b-para2.ii" guid="_1876aabd-1840-458d-b49e-faa474480581" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">trunk infrastructure provided, or to be provided, by the applicant under this part.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.130-ssec.2" guid="_e81373d2-369b-4f7a-97e0-ae19792aa696" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, an extra payment condition must not be imposed for a State infrastructure provider.</txt></block></subclause><subclause id="sec.130-ssec.3" guid="_2e51f922-0406-4bbe-8aaf-60bd8a3e7dd1" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">An extra payment condition is taken to comply with section 65(1) to the extent the infrastructure is necessary, but not yet available, to service the development.</txt></block></subclause><subclause id="sec.130-ssec.4" guid="_3eb5cb0f-a66f-4fa4-b5ac-925130a968f8" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">Subsection (3) applies even if the infrastructure is also intended to service other development.</txt></block></subclause><subclause id="sec.130-ssec.5" guid="_c69ae7fd-edea-4def-af21-8280573b4716" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The power to impose an extra payment condition is subject to sections 131 to 136.</txt></block></subclause></clause><clause id="sec.131" guid="_26c4b860-5d78-4ae9-bbd3-da7e29078f1e" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>131</no><heading id="sec.131-he" guid="_cead483f-d25d-4c6a-8853-828dedeb9d75">Content of extra payment condition</heading><subclause id="sec.131-ssec.1" guid="_ef0cee3c-60df-4d51-a505-e5bf48a1dbb2" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">An extra payment condition must state—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.131-ssec.1-para1.a" guid="_743917ef-93fa-47ea-8c11-9c32d4f41897" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the reason why the condition was imposed; and</txt></block></li><li id="sec.131-ssec.1-para1.b" guid="_5f572a00-fef4-476d-b543-1d3e83db721e" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the amount of the payment to be made under the condition; and</txt></block></li><li id="sec.131-ssec.1-para1.c" guid="_1c29233e-fa82-4912-a916-b2bd331f67bf" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">details of the trunk infrastructure for which the payment is required; and</txt></block></li><li id="sec.131-ssec.1-para1.d" guid="_3042f5b9-cd6c-49e8-a100-a4c4d3546838" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">the time (the <defterm id="sec.131-ssec.1-def.paymenttime" guid="_400c5778-1cfd-44e0-928d-8573464658f3" type="definition">payment time</defterm>) when the amount becomes payable; and</txt></block></li><li id="sec.131-ssec.1-para1.e" guid="_b91e548b-6170-4cc5-93da-3a086076efed" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">the applicant may, instead of making the payment, elect to provide all or part of the trunk infrastructure; and</txt></block></li><li id="sec.131-ssec.1-para1.f" guid="_0548f688-66d6-4bc1-be80-e0c442230d96" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">if the applicant so elects—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.131-ssec.1-para1.f-para2.i" guid="_dcb1e544-4dd9-432f-a745-1e1444244cb5" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">	any requirements for providing the trunk infrastructure; and</txt></block></li><li id="sec.131-ssec.1-para1.f-para2.ii" guid="_6db83374-b4d9-4b4d-aa45-a2f4c80bc1e4" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">when the trunk infrastructure must be provided.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.131-ssec.2" guid="_afd2f383-10a2-4c93-bb07-fe674f9969ef" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">Unless the applicant and the local government otherwise agree, the payment time is—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.131-ssec.2-para1.a" guid="_198ea88c-ae8a-4a70-beb4-07aeba1cc188" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if the trunk infrastructure is necessary to service the premises—by the day the development, or works associated with the development, starts; or</txt></block></li><li id="sec.131-ssec.2-para1.b" guid="_a74dc4e4-c9ef-4033-87e8-693f7ec37ff1" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">otherwise—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.131-ssec.2-para1.b-para2.i" guid="_e3344469-7f9f-42b5-accb-e5b31f857fe2" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">if the extra payment condition applies for reconfiguring a lot—when the local government approves a plan for the reconfiguration that, under the Land Title Act, is required to be given to the local government for approval; or</txt></block></li><li id="sec.131-ssec.2-para1.b-para2.ii" guid="_6df898b9-b4bf-43ed-ab51-adbfce998912" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">if the extra payment condition applies for building work—when the final inspection certificate for the building work, or the certificate of classification for the building, is given under the <legref jurisd="QLD" type="act" check="unknown">Building Act</legref>; or</txt></block></li><li id="sec.131-ssec.2-para1.b-para2.iii" guid="_7422577f-a371-4f08-97eb-8df3eee3e8de" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">if the extra payment condition applies for a material change of use—when the change happens.</txt></block></li></list></block></li></list></block></subclause></clause><clause id="sec.132" guid="_8f54015c-cc61-4747-a8e0-41a188340c13" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>132</no><heading id="sec.132-he" guid="_a1b96c63-d95d-4439-b0dd-f94569aa8c2f">Restriction if development completely in PIA</heading><subclause id="sec.132-ssec.1" guid="_ce4899c7-6c18-45bd-a48a-e748e0266559" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to an extra payment condition that a local government imposes for development completely inside the PIA.</txt></block></subclause><subclause id="sec.132-ssec.2" guid="_4dffd381-8c61-4855-8ccd-4eb4e26708c8" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The extra payment condition may require a payment only as follows—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.132-ssec.2-para1.a" guid="_c4a76964-edd8-4c31-9ee5-c168c77eb03e" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for trunk infrastructure to be provided earlier than planned in the LGIP—the extra establishment cost that the local government incurs to provide the infrastructure earlier than planned;</txt></block></li><li id="sec.132-ssec.2-para1.b" guid="_e124998c-b79c-474e-be8e-130a5250d4ca" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for infrastructure associated with a different type or scale of development from that assumed in the LGIP—the establishment cost of any extra trunk infrastructure made necessary by the development.</txt></block></li></list></block></subclause></clause><clause id="sec.133" guid="_3b596bb5-0195-4156-b5f9-5c9b4080a0ab" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>133</no><heading id="sec.133-he" guid="_5646ac45-25fd-4c59-beec-7380018330a3">Extra payment conditions for development outside PIA</heading><block status="uncommenced"><txt break.before="1">An extra payment condition that a local government imposes for development completely or partly outside the PIA may require the payment of—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.133-para1.a" guid="_14db82d2-891d-4607-b3cf-42746d6c4d8f" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the establishment cost of trunk infrastructure that is—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.133-para1.a-para2.i" guid="_e47939ea-a2ef-493b-af28-127091a8e577" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">made necessary by the development; and</txt></block></li><li id="sec.133-para1.a-para2.ii" guid="_80048c57-a3e3-4f99-a174-6878dbda9f56" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">if the local government’s planning scheme indicates the premises are part of an area intended for future development for purposes other than rural or rural residential purposes—necessary to service the rest of the area; and</txt></block></li></list></block></li><li id="sec.133-para1.b" guid="_a1d81da9-f8f6-4491-a0e5-36ef5626ea33" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">either or both of the following establishment costs of any temporary trunk infrastructure—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.133-para1.b-para2.i" guid="_6351da6e-6d82-4f29-9b83-65027f5194ce" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">costs required to ensure the safe or efficient operation of infrastructure needed to service the development;</txt></block></li><li id="sec.133-para1.b-para2.ii" guid="_7bb54949-4a36-4141-9b98-dc333815fc61" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">costs made necessary by the development; and</txt></block></li></list></block></li><li id="sec.133-para1.c" guid="_54a16d63-aca5-45e2-a3a6-8a8227224629" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">any decommissioning, removal and rehabilitation costs of the temporary infrastructure; and</txt></block></li><li id="sec.133-para1.d" guid="_db28f976-aa53-47b8-8c99-485f5c682fa9" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">the maintenance and operating costs for up to 5 years of the infrastructure and temporary infrastructure as stated in paragraphs (a) and (b).</txt></block></li></list></block></clause><clause id="sec.134" guid="_80e3f227-4961-425d-adf9-86656fb17079" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>134</no><heading id="sec.134-he" guid="_b63b23be-67d1-4af9-8ff7-05cc0b06a8d3">Refund if development in PIA</heading><subclause id="sec.134-ssec.1" guid="_4f6979e4-c2cc-4b51-b0cb-e5c1d4327f35" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to an extra payment condition that a local government imposes for development completely inside the PIA.</txt></block></subclause><subclause id="sec.134-ssec.2" guid="_395a7184-c243-41cf-954f-5219b256fa94" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The local government must refund the payer the proportion of the establishment cost of the infrastructure that—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.134-ssec.2-para1.a" guid="_3a9aff6a-f56a-4c29-9698-aff51f54fe68" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">may be apportioned reasonably to other users of the infrastructure; and</txt></block></li><li id="sec.134-ssec.2-para1.b" guid="_a74607cf-96b4-498d-bf90-8159dd3fee78" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">has been, is, or is to be, the subject of a levied charge by the local government.</txt></block></li></list></block></subclause></clause><clause id="sec.135" guid="_b9a286d7-ceec-4439-889c-938b3a911d30" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>135</no><heading id="sec.135-he" guid="_32029aeb-e09f-4a27-9f0b-b42ab51c9ce1">Refund if development approval stops</heading><subclause id="sec.135-ssec.1" guid="_d0432727-5ce3-4428-ae1d-087296a4439c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.135-ssec.1-para1.a" guid="_48ec8d00-f67d-4396-864a-49a81b6326e3" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a development approval subject to an extra payment condition no longer has effect; and</txt></block></li><li id="sec.135-ssec.1-para1.b" guid="_46529706-4ad9-442d-a1d9-5e8d31b01880" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a payment has been made under the condition; and</txt></block></li><li id="sec.135-ssec.1-para1.c" guid="_dfe3ebfa-5432-4113-9073-5e658b603bec" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">construction of the infrastructure that is the subject of the condition has not substantially started before the development approval no longer has effect.</txt></block></li></list></block></subclause><subclause id="sec.135-ssec.2" guid="_9bc73666-f43a-4928-81af-92f9bccea5b4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The local government must refund to the payer any part of the payment the local government has not spent, or contracted to spend, on designing and constructing the infrastructure.</txt></block></subclause><subclause id="sec.135-ssec.3" guid="_0497a1ed-ade7-411e-8598-86286e8701a9" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The timing of the refund is subject to terms agreed between the payer and local government.</txt></block></subclause></clause><clause id="sec.136" guid="_57796146-05db-4e4d-b91d-7fdbcfc83257" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>136</no><heading id="sec.136-he" guid="_9af5117c-6044-448c-ae85-6f75cec0a307">Extra payment condition does not affect other powers</heading><block status="uncommenced"><txt break.before="1">To remove any doubt, it is declared that the imposition of an extra payment condition does not prevent a local government from—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.136-para1.a" guid="_eb702a58-31af-43b9-805b-ea441a1a8aa7" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">adopting charges for trunk infrastructure and levying charges; or</txt></block></li><li id="sec.136-para1.b" guid="_afd669bb-b101-4f6a-a8ea-6f91ecb0dbc6" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">imposing a condition for non-trunk infrastructure; or</txt></block></li><li id="sec.136-para1.c" guid="_8fef50a2-0047-431b-a9ff-ec339431811a" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">imposing a necessary infrastructure condition.</txt></block></li></list></block></clause></subdivision><subdivision id="ch.4-pt.2-div.3-sdiv.3" guid="_f8fa03e0-208d-4892-a45a-59207c52d1ca" status="uncommenced" affected.by.uncommenced="0"><no>Subdivision 3</no><heading id="ch.4-pt.2-div.3-sdiv.3-he" guid="_9f76aeb3-8d1e-445b-ae6f-6762c27f6b39">Working out cost for required offset or refund</heading><clause id="sec.137" guid="_32c40664-b8f7-45cc-8608-ce4359db3f23" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>137</no><heading id="sec.137-he" guid="_cbfdc8d3-b44f-4024-aee3-704094ce450a">Process</heading><subclause id="sec.137-ssec.1" guid="_b1e4eea7-87e3-4f83-8a92-d161287b9e1c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.137-ssec.1-para1.a" guid="_00357785-62c4-4c81-aaeb-96fc2c7f7e0a" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a development approval requires the applicant to provide trunk infrastructure; and</txt></block></li><li id="sec.137-ssec.1-para1.b" guid="_3dc2c3dd-a981-4323-b4d3-68578fc0deec" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the local government has given the applicant an infrastructure charges notice that includes information about an offset or refund under this part relating to the establishment cost of the trunk infrastructure; and</txt></block></li><li id="sec.137-ssec.1-para1.c" guid="_45eeacc7-dc9c-4325-9f05-a8187bb7d358" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the applicant does not agree with the amount of the establishment cost.</txt></block></li></list></block></subclause><subclause id="sec.137-ssec.2" guid="_48f77dc1-9f7b-452c-ad1d-b0326fec4b44" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The applicant may, by notice given to the local government, require the local government to use the method under the relevant charges resolution to recalculate the establishment cost.</txt></block></subclause><subclause id="sec.137-ssec.3" guid="_6efda5d7-8964-4a43-a046-ba12e0865bf2" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">A notice under subsection (2) must be given to the local government before the levied charge under the infrastructure charges notice becomes payable under section 122.</txt></block></subclause><subclause id="sec.137-ssec.4" guid="_b82336eb-039f-4355-9e52-610c9b62c434" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">By notice given to the applicant, the local government must amend the infrastructure charges notice.</txt></block></subclause><subclause id="sec.137-ssec.5" guid="_cd6d6e9e-a26c-447d-be5e-417915937cf1" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The amended infrastructure charges notice must adopt the method to work out the establishment cost.</txt></block></subclause></clause></subdivision></division><division id="ch.4-pt.2-div.4" guid="_64b52d65-c607-4401-8f21-7bc7c628659a" status="uncommenced" affected.by.uncommenced="0"><no>Division 4</no><heading id="ch.4-pt.2-div.4-he" guid="_811ea333-77ac-4947-a3b3-5d4a9f5ee0bf">Miscellaneous provisions about trunk infrastructure</heading><subdivision id="ch.4-pt.2-div.4-sdiv.1" guid="_8840bac6-d76b-4906-9fc1-40083b78abd5" status="uncommenced" affected.by.uncommenced="0"><no>Subdivision 1</no><heading id="ch.4-pt.2-div.4-sdiv.1-he" guid="_278f3ad5-5722-4f29-ab9c-79f962d85327">Conversion of particular non-trunk infrastructure before construction starts</heading><clause id="sec.138" guid="_a6d5995c-d110-4e00-a29a-84984b6fac0d" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>138</no><heading id="sec.138-he" guid="_ef779fe1-cf89-4caf-a09a-c01e030587cd">Application of this subdivision</heading><block status="uncommenced"><txt break.before="1">This subdivision applies if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.138-para1.a" guid="_be1c5ecf-fe80-4462-b993-55931e0a1690" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a particular development condition under section 145 requires non-trunk infrastructure to be provided; and</txt></block></li><li id="sec.138-para1.b" guid="_20b6943e-a12e-459f-b0a3-0a1228366fa0" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the construction of the non-trunk infrastructure has not started.</txt></block></li></list></block></clause><clause id="sec.139" guid="_23ea4f4e-6d93-4d08-9549-9ad8cedffb08" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>139</no><heading id="sec.139-he" guid="_359a4419-c7e7-467b-9d61-9715b7f2fe71">Application to convert infrastructure to trunk infrastructure</heading><subclause id="sec.139-ssec.1" guid="_259dd97e-a505-4f20-b473-6deb93804ac6" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The applicant for the development approval may apply to convert non-trunk infrastructure to trunk infrastructure.</txt><note id="sec.139-ssec.1-note" guid="_5dff00c3-e9a4-467a-b550-02fe2c65c1e4" type="example"><heading id="sec.139-ssec.1-note-he" guid="_589d821c-b6cc-45bd-82a3-2246dc8375e0">Note—</heading><block status="uncommenced"><txt break.before="1">In this Act, <defterm id="sec.139-ssec.1-def.applicant" guid="_94a08d4b-d2fc-41e4-bd85-21761999b397" type="definition">applicant</defterm>, in relation to a development approval, includes any person in whom the benefit of the approval vests—see section 280.</txt></block></note></block></subclause><subclause id="sec.139-ssec.2" guid="_ff339b7c-c111-464d-86be-09e446abbe93" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The application (the <defterm id="sec.139-def.conversionapplication" guid="_ce53e48f-86e0-4964-803d-2b27d4833c44" type="definition">conversion application</defterm>) must be made to the local government, in writing, within 1 year after the development approval starts to have effect.</txt></block></subclause></clause><clause id="sec.140" guid="_554b54cb-335b-4770-b276-977d922a85bb" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>140</no><heading id="sec.140-he" guid="_4f046733-ed59-4b79-b53e-83c7e945642b">Deciding conversion application</heading><subclause id="sec.140-ssec.1" guid="_b7bd32e1-df43-4805-ac25-2fc9d6464b6a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The local government must consider and decide the conversion application within 30 business days after—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.140-ssec.1-para1.a" guid="_42ca98ca-f391-4d6e-a69e-2ed4f0d88571" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the application is made; or</txt></block></li><li id="sec.140-ssec.1-para1.b" guid="_97967998-13ac-4107-bfa4-df9d0c21eba6" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if an information request is made—the applicant complies with the request.</txt></block></li></list></block></subclause><subclause id="sec.140-ssec.2" guid="_1379f037-1904-4dd6-b290-d42daaf737e9" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">When deciding the conversion application, the local government must consider the criteria for deciding the application in its charges resolution.</txt></block></subclause><subclause id="sec.140-ssec.3" guid="_6655276c-6e74-4be3-b424-a3c9f02db6b7" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">However, at any time before making the decision, the local government may give the applicant a notice requiring the applicant to give information that the local government reasonably needs to make the decision.</txt></block></subclause><subclause id="sec.140-ssec.4" guid="_405e8c8b-f0af-42f7-80b8-1f774657dbd7" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The notice must state—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.140-ssec.4-para1.a" guid="_8b5284c3-55df-42e6-b748-9089980929e6" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">	the information the local government requires; and</txt></block></li><li id="sec.140-ssec.4-para1.b" guid="_1dad16c0-ca26-42a1-a249-dfd4171590d3" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the period of at least 10 business days for giving the information; and</txt></block></li><li id="sec.140-ssec.4-para1.c" guid="_d493aec2-5f91-42cf-8492-fa9b6021e419" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the effect of subsection (5).</txt></block></li></list></block></subclause><subclause id="sec.140-ssec.5" guid="_35bb3655-2842-46d8-85f5-7b597805ac6e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The application lapses if the applicant does not comply with the notice within the later of the following—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.140-ssec.5-para1.a" guid="_2ea0a5a7-79c9-46b4-8e9a-798bed647b4f" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the period stated in the notice for giving the information;</txt></block></li><li id="sec.140-ssec.5-para1.b" guid="_faae2fd4-4e4c-4194-b853-0a59b6275a6f" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the period as agreed between the local government and applicant, within the period stated in the notice.</txt></block></li></list></block></subclause></clause><clause id="sec.141" guid="_d4086a5e-f126-4316-bc11-f151d23a2ea4" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>141</no><heading id="sec.141-he" guid="_4a1e2af4-3ddb-4181-94be-6115533708c0">Notice of decision</heading><subclause id="sec.141-ssec.1" guid="_b55ba26f-fe6d-4603-bc11-adc7101b93d1" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">As soon as practicable after deciding the conversion application, the local government must give a decision notice about the decision to the applicant.</txt></block></subclause><subclause id="sec.141-ssec.2" guid="_eb7d010d-4ac9-4acc-a03c-403a1fa56887" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">If the decision is to convert non-trunk infrastructure to trunk infrastructure, the notice must state whether an offset or refund under this part applies and, if it does, information about the offset or refund.</txt></block></subclause></clause><clause id="sec.142" guid="_58a5cc92-0490-441d-98c6-53a32547bad8" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>142</no><heading id="sec.142-he" guid="_3bd11b5b-ed8c-484d-9421-39dbc2ee03b0">Effect of and action after conversion</heading><subclause id="sec.142-ssec.1" guid="_deefbace-72a6-4def-96f2-cf7b763c91ee" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if the decision on a conversion application is to convert non-trunk infrastructure to trunk infrastructure.</txt></block></subclause><subclause id="sec.142-ssec.2" guid="_95b8357d-fecd-41ed-9c8e-8d9269737192" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The condition of the relevant development approval requiring the non-trunk infrastructure to be provided no longer has effect.</txt></block></subclause><subclause id="sec.142-ssec.3" guid="_90cdd8c6-5127-43a3-a385-167e987ddf02" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">Within 20 business days after making the decision, the local government may amend the development approval by imposing a necessary infrastructure condition for the trunk infrastructure.</txt></block></subclause><subclause id="sec.142-ssec.4" guid="_6c0cf050-8656-40af-829d-c64717c32461" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">If a necessary infrastructure condition is imposed, the local government must also do either of the following within 10 business days after the imposition for the purposes of section 129(2) or (3)(b)—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.142-ssec.4-para1.a" guid="_dd16051a-5493-411d-b1e2-865348aa34d8" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">give an infrastructure charges notice;</txt></block></li><li id="sec.142-ssec.4-para1.b" guid="_d6fe377e-2a19-46ce-9a17-96f967ee589e" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">amend an infrastructure charges notice, by notice given to the applicant.</txt></block></li></list></block></subclause><subclause id="sec.142-ssec.5" guid="_fadd2dd1-9841-46c4-898a-670cb89926e2" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">For taking action under subsections (3) and (4), divisions 2 and 3 and schedule 1, table 1, item 4 apply as if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.142-ssec.5-para1.a" guid="_86e66c7a-452a-4d94-b0a8-9766c81b41e2" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a development approval were a reference to the conversion; and</txt></block></li><li id="sec.142-ssec.5-para1.b" guid="_154884ae-1ef4-4c2f-83be-d4ec6b1f82ff" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a levied charge were a reference to the amendment of a levied charge.</txt></block></li></list></block></subclause></clause></subdivision><subdivision id="ch.4-pt.2-div.4-sdiv.2" guid="_47b9491d-725a-41b0-8069-7a0b93a7a7f2" status="uncommenced" affected.by.uncommenced="0"><no>Subdivision 2</no><heading id="ch.4-pt.2-div.4-sdiv.2-he" guid="_5b47bc70-e8c0-49d5-8175-101e9f906b79">Other provisions</heading><clause id="sec.143" guid="_9143eb5b-0411-4d1b-8533-be4795144967" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>143</no><heading id="sec.143-he" guid="_309a9435-af4c-4e00-bbd9-ca4ab847a45f">Financial provisions</heading><subclause id="sec.143-ssec.1" guid="_25a53c96-af24-42fc-ab3d-4120b4a86299" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A levied charge paid to a local government must be used to provide trunk infrastructure.</txt></block></subclause><subclause id="sec.143-ssec.2" guid="_e1cac600-56d7-4ff1-acc8-85dc93eff16f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">To remove any doubt, it is declared that the amount paid need not be held in trust by the local government.</txt></block></subclause></clause><clause id="sec.144" guid="_ea3533d1-1ccc-4918-982e-5b5ba980b1f3" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>144</no><heading id="sec.144-he" guid="_cbc2ada1-225b-4d91-b9c3-33300baa9f2f">Levied charge taken to be rates</heading><subclause id="sec.144-ssec.1" guid="_57f13ee9-5c5a-4b8f-9399-d3aa380bc127" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A levied charge is, for the purpose of its recovery, taken to be rates of the local government that levied the charge.</txt></block></subclause><subclause id="sec.144-ssec.2" guid="_6463ccf0-37f4-4db0-b329-1e5524852b23" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, subsection (1) is subject to any agreement between the local government and the applicant.</txt></block></subclause></clause></subdivision></division><division id="ch.4-pt.2-div.5" guid="_e69e78a7-b63a-41a3-93ca-fa8e73ec731d" status="uncommenced" affected.by.uncommenced="0"><no>Division 5</no><heading id="ch.4-pt.2-div.5-he" guid="_29f43546-e9b6-4efc-b97d-35c09c85cd92">Non-trunk infrastructure</heading><clause id="sec.145" guid="_66796e71-a45a-42cf-aa1f-968174918471" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>145</no><heading id="sec.145-he" guid="_1a14848b-51aa-4c34-8d76-a22b90e3f225">Conditions local governments may impose</heading><block status="uncommenced"><txt break.before="1">A development condition about non-trunk infrastructure that a local government imposes—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.145-para1.a" guid="_bfc9decd-2139-4839-8347-b69e821884a7" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">must state—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.145-para1.a-para2.i" guid="_73b6323f-e198-4fed-a0f4-887bb92e38d7" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the infrastructure to be provided; and</txt></block></li><li id="sec.145-para1.a-para2.ii" guid="_e6865bfb-9469-4d25-a068-82a87ffaa586" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">when the infrastructure must be provided.</txt></block></li></list></block></li><li id="sec.145-para1.b" guid="_3ab64ad1-c8f5-48ca-a92b-310ebf78de83" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">may be about providing development infrastructure for 1 or more of the following—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.145-para1.b-para2.i" guid="_2f4bb54d-0da0-4c1b-8b9a-e24f854c9d4b" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a network, or part of a network, internal to the premises;</txt></block></li><li id="sec.145-para1.b-para2.ii" guid="_cfcab617-c978-404a-a4eb-5168a1e418fb" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">connecting the premises to external infrastructure networks;</txt></block></li><li id="sec.145-para1.b-para2.iii" guid="_2a057b6d-e48a-474e-ab3e-8e941829ffe3" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">protecting or maintaining the safety or efficiency of the infrastructure network of which the non-trunk infrastructure is a component.</txt><note id="sec.145-para1.b-para2.iii-note" guid="_3efb228c-dc9b-4e84-b591-578f5a1670bc" type="example"><heading id="sec.145-para1.b-para2.iii-note-he" guid="_bdf27b58-d077-4625-86be-ae5a11d88ad0">Example of a condition for subparagraph (iii)—</heading><block status="uncommenced"><txt break.before="1">A condition that works near transport infrastructure must not adversely affect the infrastructure’s integrity.</txt></block></note></block></li></list></block></li></list></block></clause></division></part><part id="ch.4-pt.3" guid="_8c63e7a7-ac97-47e7-b845-7f57d53b45c1" status="uncommenced" affected.by.uncommenced="0"><no>Part 3</no><heading id="ch.4-pt.3-he" guid="_93471908-6204-402b-9b1f-e23e245de789">Provisions for State infrastructure providers</heading><clause id="sec.146" guid="_c4e9a502-88ac-4191-bda7-3a4008ba3ff6" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>146</no><heading id="sec.146-he" guid="_a6875f26-7195-44b3-a519-59aa1b5e3a44">Imposing conditions about infrastructure</heading><subclause id="sec.146-ssec.1" guid="_c38dce7d-2826-40ae-8d93-33b282d2b83a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A State infrastructure provider may impose a development condition (a <defterm id="sec.146-def.Staterelatedcondition" guid="_529b1bad-6e73-4351-9ef3-051daba79266" type="definition">State-related condition</defterm>) on a development approval about—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.146-ssec.1-para1.a" guid="_d7c299b6-11f1-4d90-bc10-2ecb72a1c7b3" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">infrastructure; and</txt></block></li><li id="sec.146-ssec.1-para1.b" guid="_d467e6cd-3c0f-45bb-8a39-8b5c514410a9" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">works to protect or maintain infrastructure operation.</txt></block></li></list></block></subclause><subclause id="sec.146-ssec.2" guid="_6dd19896-50e0-4289-aa4e-9c94c3154708" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, a State-related condition may only be about protecting or maintaining the safety or efficiency of—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.146-ssec.2-para1.a" guid="_149c55f2-5ddf-49bf-b3d7-7e438ae2db76" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">existing or proposed State-owned or State-controlled transport infrastructure; or</txt></block></li><li id="sec.146-ssec.2-para1.b" guid="_83fff594-a84a-411f-86aa-1e7832f893ec" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">public passenger transport or public passenger transport infrastructure (whether or not State-owned or State-controlled); or</txt></block></li><li id="sec.146-ssec.2-para1.c" guid="_15da256c-578c-4d97-837e-5b16eb1ab431" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the safety or efficiency of railways, ports or airports under the Transport Infrastructure Act; or</txt></block></li><li id="sec.146-ssec.2-para1.d" guid="_eb6b7d8e-efe0-47b9-9d1d-64236dd458c2" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">if the State infrastructure provider is the chief executive—a matter stated in paragraph (a), (b) or (c) for another State infrastructure provider.</txt><note id="sec.146-ssec.2-para1.d-note" guid="_85ee0c0e-b77b-47e6-b502-9f5361ae4de5" type="example"><heading id="sec.146-ssec.2-para1.d-note-he" guid="_0852e6cf-2fc6-45ef-9711-f48252c93e8f">Examples of infrastructure that might be required under a State-related condition—</heading><block status="uncommenced"><list number.type="bull" unnumbered.indent="0"><li id="sec.146-ssec.2-para1.d-note-para2" guid="_711c4868-3e9f-4d3f-a8da-e21c7b933582" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">turning lanes or traffic signals at a site access or nearby intersection that are to ensure road links and intersections continue to perform at an acceptable level</txt></block></li><li id="sec.146-ssec.2-para1.d-note-para2-oc.2" guid="_d9d6ea6d-d906-410b-94ae-10a1eee3c0c1" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">upgraded traffic control devices at a level crossing in response to increased traffic</txt></block></li><li id="sec.146-ssec.2-para1.d-note-para2-oc.3" guid="_40c8e490-3cbc-4100-b722-a60204ab54bf" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">drainage or retaining structures that are to protect transport infrastructure from changed hydraulics or excavation next to State-owned or State-controlled transport infrastructure</txt></block></li></list></block></note></block></li></list></block></subclause><subclause id="sec.146-ssec.3" guid="_856d2650-9df1-4f13-8f9d-1b5a3434e33f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.146-ssec.3-def.publicpassengertransport_" guid="_b2e0905b-9f2f-4d8c-afd5-f87899e887d8" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.146-ssec.3-def.publicpassengertransport" guid="_33235f46-0dc2-461d-a313-6591405d7974" type="definition">public passenger transport</defterm> means the carriage of passengers by a public passenger service as defined under the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Transport Operations (Passenger Transport) Act 1994</name></legref> using a public passenger vehicle as defined under that Act.</txt></definition><definition id="sec.146-ssec.3-def.publicpassengertransportinfrastructure_" guid="_975f1584-a5ef-48c2-afe6-9f2433b3d5b4" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.146-ssec.3-def.publicpassengertransportinfrastructure" guid="_f322b65a-7cc3-4962-a393-cd2cb2c77644" type="definition">public passenger transport infrastructure</defterm> means infrastructure for, or associated with, the provision of public passenger transport.</txt></definition><definition id="sec.146-ssec.3-def.safetyorefficiency_" guid="_d875b85b-f2b1-47d6-944a-6ab29925867e" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.146-ssec.3-def.safetyorefficiency" guid="_efd2a624-6685-415a-9038-f62fd765b883" type="definition">safety or efficiency</defterm>, of infrastructure, means—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.146-ssec.3-def.safetyorefficiency-para1.a" guid="_d712dc49-2af5-49f9-bd3e-d9ba40be95bc" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the safety of the users of the infrastructure and of other persons affected by the infrastructure; or</txt></block></li><li id="sec.146-ssec.3-def.safetyorefficiency-para1.b" guid="_e0ca68f4-ea86-4e5b-98bf-66e39b3a433a" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the efficiency of the use of the infrastructure.</txt></block></li></list></definition></deflist></block></subclause></clause><clause id="sec.147" guid="_d2e9837e-d1e0-4776-a3a0-80c07920b9c7" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>147</no><heading id="sec.147-he" guid="_505151b2-0a4b-41dd-a5a9-d41fccbce82d">Content of State-related condition</heading><block status="uncommenced"><txt break.before="1">A State-related condition must state—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.147-para1.a" guid="_88962a3b-da43-405e-80b4-5520a374ba86" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the infrastructure or works to be provided, or the contribution to be made, under the condition; and</txt></block></li><li id="sec.147-para1.b" guid="_0ad46f17-f694-43a9-bc47-d8afd281d2ba" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">when the provision or contribution must take place.</txt></block></li></list></block></clause><clause id="sec.148" guid="_b3d9d7d2-4c1f-4d1b-a9ea-d3ecb6bb9c06" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>148</no><heading id="sec.148-he" guid="_8bef0bc3-add5-4110-bcdd-f7da435b9353">Refund if State-related condition stops</heading><subclause id="sec.148-ssec.1" guid="_beb9066a-6b58-4d05-8c1d-ccd87299a8c9" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.148-ssec.1-para1.a" guid="_07f0f1d2-1932-4b48-95d6-498b6a3e88ee" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a State infrastructure provider imposed a State-related condition on a development approval; and</txt></block></li><li id="sec.148-ssec.1-para1.b" guid="_2616b8fe-2aea-487f-834b-673e6e2750d0" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a payment has been made under the condition; and</txt></block></li><li id="sec.148-ssec.1-para1.c" guid="_9ea748c8-74fc-4f57-b5b4-5bba70a11f3e" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">construction of the infrastructure that is the subject of the condition had not substantially started; and</txt></block></li><li id="sec.148-ssec.1-para1.d" guid="_baf2c6aa-a8fd-4db6-8b47-115806fb40ac" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">the development approval stops having effect.</txt></block></li></list></block></subclause><subclause id="sec.148-ssec.2" guid="_6a350536-3286-4872-ae39-5b6879c1b39d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The public sector entity responsible for providing the infrastructure must refund to the payer any part of the payment not spent, or contracted to spend, on designing or constructing the infrastructure before being told the development approval no longer has effect.</txt></block></subclause></clause><clause id="sec.149" guid="_908cc733-2207-47e3-a933-73a3fa3ce951" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>149</no><heading id="sec.149-he" guid="_8d72ed7e-ebc2-4340-9192-4c316aef9cc3">Reimbursement by local government for replacement infrastructure</heading><subclause id="sec.149-ssec.1" guid="_fb5a276f-cff0-4a92-9e72-f41f17177d38" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if infrastructure provided under a State-related condition—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.149-ssec.1-para1.a" guid="_00b07e76-0f0f-42ae-ae29-9c76434fc8c3" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">has replaced, or is to replace, infrastructure for which there has been, is, or is to be, a levied charge by a local government; and</txt></block></li><li id="sec.149-ssec.1-para1.b" guid="_e77cb857-1b63-4811-9524-80db73d0c675" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">provides the same desired standard of service as the replaced infrastructure.</txt></block></li></list></block></subclause><subclause id="sec.149-ssec.2" guid="_83dc7d1f-a81a-486d-a089-a7164ab8a024" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The local government must—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.149-ssec.2-para1.a" guid="_2069a80d-028c-443a-98dc-5499c1948e1c" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">pay the amount of the levied charge, when paid to local government, to the State infrastructure provider that imposed the condition to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.149-ssec.2-para1.a-para2.i" guid="_e005ffac-0435-4701-8ced-c386b3ed11b1" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">provide the replacement infrastructure; or</txt></block></li><li id="sec.149-ssec.2-para1.a-para2.ii" guid="_dbb7a498-2384-48bf-b246-177030c3ac42" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">reimburse a person who provided the replacement infrastructure; and</txt></block></li></list></block></li><li id="sec.149-ssec.2-para1.b" guid="_295698a4-b758-43be-a203-43cdb1aa2333" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">agree with the State infrastructure provider and the person who provided the replacement infrastructure about when the amount of the levied charge will be paid.</txt></block></li></list></block></subclause></clause></part><part id="ch.4-pt.4" guid="_fedcd76c-c1ca-4835-b1c6-00dec38de040" status="uncommenced" affected.by.uncommenced="0"><no>Part 4</no><heading id="ch.4-pt.4-he" guid="_bfb05dc2-6614-499c-a5b5-c06f6375c834">Infrastructure agreements</heading><clause id="sec.150" guid="_5aa77cc1-547d-4f6b-b405-7bdbe7d02f8f" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>150</no><heading id="sec.150-he" guid="_f077b35d-e626-40fb-8e23-3e24fbadca18">Infrastructure agreement</heading><block status="uncommenced"><txt break.before="1">An <defterm id="def.infrastructureagreement" guid="_609197c3-b44a-4977-89f3-6bb4b2be6624" type="definition">infrastructure agreement</defterm> is an agreement, as amended from time to time, stated in—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.150-para1.a" guid="_fea7389b-106a-4357-a15d-9889f0c8453d" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">section 67, to the extent the agreement is about a condition for paying for, or providing, infrastructure; or</txt></block></li><li id="sec.150-para1.b" guid="_ae5af5af-3cd2-40f7-b5b7-f5eeb701b66a" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">section 123; or</txt></block></li><li id="sec.150-para1.c" guid="_26371ee6-d5da-4c4e-bdcb-e3325ef97830" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">section 131(2); or</txt></block></li><li id="sec.150-para1.d" guid="_5a14a035-5a75-4c78-abf2-c3588a2ac27c" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">section 135(3); or</txt></block></li><li id="sec.150-para1.e" guid="_cfc7a458-a543-409b-919c-a8b6b6e104e1" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">section 144(2); or</txt></block></li><li id="sec.150-para1.f" guid="_d0a39c6e-ba84-4173-9915-83901c6ea844" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">section 149(2); or</txt></block></li><li id="sec.150-para1.g" guid="_2f47b97d-482f-4fbc-9708-20180cb5906f" status="uncommenced" provision.type="other"><no>(g)</no><block status="uncommenced"><txt break.before="1">	section 158.</txt></block></li></list></block></clause><clause id="sec.151" guid="_44f74b93-f30d-4d1a-9b80-1fa0c30dbd3b" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>151</no><heading id="sec.151-he" guid="_c58b410e-5854-43fc-9264-95d3ab60f207">Obligation to negotiate in good faith</heading><subclause id="sec.151-ssec.1" guid="_48c16338-0bbe-4349-93e5-c74e0d70798b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.151-ssec.1-para1.a" guid="_cce1f314-43d5-4659-a7cd-dc600c2eabb3" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a public sector entity proposes to another entity that they enter into an infrastructure agreement; or</txt></block></li><li id="sec.151-ssec.1-para1.b" guid="_e7a8ac40-d60d-4e22-a1bc-8ba7e12d571a" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">another entity proposes to a public sector entity that they enter into an infrastructure agreement.</txt></block></li></list></block></subclause><subclause id="sec.151-ssec.2" guid="_a24d336e-6b26-4db2-96d5-59e8d824a4f5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The entity (the<defterm id="sec.151-def.recipient" guid="_0819be2b-bb58-4818-a841-78f073c99987" type="definition"> recipient</defterm>) to whom the proposal is made must, in writing, tell the entity making the proposal if the recipient agrees to entering into negotiations for an infrastructure agreement.</txt></block></subclause><subclause id="sec.151-ssec.3" guid="_6603742f-06c7-43ef-85bb-7cb8e384039e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">When negotiating an infrastructure agreement, the entities must act in good faith.</txt><note id="sec.151-ssec.3-note" guid="_3ae7fb06-a393-42cd-a1e0-e25d946f6a7b" type="example"><heading id="sec.151-ssec.3-note-he" guid="_8307523c-0e5e-4dc4-a990-e1ea33fba12b">Examples of actions that subsection (3) requires—</heading><block status="uncommenced"><list number.type="bull" unnumbered.indent="0"><li id="sec.151-ssec.3-note-para1" guid="_ac374059-5b8a-450b-9c3b-85023a18f3bd" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">disclosing to the other party to the negotiations in a timely way information relevant to entering into the proposed agreement</txt></block></li><li id="sec.151-ssec.3-note-para1-oc.2" guid="_81c1dce1-ac88-4ce3-ba37-71ee0fd38c6c" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">considering and responding in a timely way to the other party’s proposals about the proposed agreement</txt></block></li><li id="sec.151-ssec.3-note-para1-oc.3" guid="_aa937bef-eeb1-4aa6-917e-abd7080728b2" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">giving reasons for each response</txt></block></li></list></block></note></block></subclause></clause><clause id="sec.152" guid="_c4c1b3a4-1568-4c59-b7ca-5c57921d0d34" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>152</no><heading id="sec.152-he" guid="_5e3dc771-b2a4-4efb-860e-861bc67e4164">Content of infrastructure agreement</heading><subclause id="sec.152-ssec.1" guid="_466e5df2-f6fe-4b3b-a465-cfedd18ec640" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">An infrastructure agreement must—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.152-ssec.1-para1.a" guid="_943613de-2cac-405e-b1a7-f7b5da73d691" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if responsibilities under the agreement would be affected by a change in the ownership of premises that are the subject of the agreement—include a statement about how the responsibilities must be fulfilled in that event; and</txt></block></li><li id="sec.152-ssec.1-para1.b" guid="_beeec659-e279-45c4-8cea-0d2f19327ade" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the fulfilment of responsibilities under the agreement depends on development entitlements that may be affected by a planning change—include a statement about—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.152-ssec.1-para1.b-para2.i" guid="_df904653-99f3-47f8-9c14-9b708b7d75ca" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">refunding or reimbursing amounts paid under the agreement; and</txt></block></li><li id="sec.152-ssec.1-para1.b-para2.ii" guid="_1b12d7d2-cbc1-47ff-85fc-8ae0ed00f057" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">changing or cancelling the responsibilities if the development entitlements are changed without the consent of the person required to fulfil the responsibilities; and</txt></block></li></list></block></li><li id="sec.152-ssec.1-para1.c" guid="_0ac28d65-af51-4f71-b157-a0e7c088973f" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">include any other matter prescribed by regulation.</txt></block></li></list></block></subclause><subclause id="sec.152-ssec.2" guid="_e24cce53-8575-4f7d-90be-507cd604f8b3" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">To remove any doubt, it is declared that an infrastructure agreement may include matters that are not within the jurisdiction of a public sector entity that is a party to the agreement.</txt></block></subclause></clause><clause id="sec.153" guid="_bcef777d-e5d7-4e16-a2f6-c791b81acd04" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>153</no><heading id="sec.153-he" guid="_01a6ca22-e490-4c6d-a479-db20644e840b">Copy of infrastructure agreement for local government</heading><subclause id="sec.153-ssec.1" guid="_c018dc75-f3fd-475a-bf37-892e6a65f251" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.153-ssec.1-para1.a" guid="_b376cf61-9190-4aa7-9b93-32f8a44b721a" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a distributor-retailer or a public sector entity other than a local government is a party to an infrastructure agreement; and</txt></block></li><li id="sec.153-ssec.1-para1.b" guid="_48336bc0-84e6-48be-be22-e05838927752" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the local government for the area to which the agreement applies is not a party to the agreement.</txt></block></li></list></block></subclause><subclause id="sec.153-ssec.2" guid="_88f15b4e-7c58-45a5-ae72-da26d756a3cf" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The distributor-retailer or public sector entity must give a copy of the agreement to the local government.</txt></block></subclause></clause><clause id="sec.154" guid="_a9d0f2e7-075a-4dda-8664-47b31ef367e8" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>154</no><heading id="sec.154-he" guid="_fe936c68-adb4-4a74-8320-22d2fdd23d3b">Copy of particular infrastructure agreements for distributor-retailers</heading><subclause id="sec.154-ssec.1" guid="_00403f26-0b9d-4e22-ae34-8093e8129c4d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.154-ssec.1-para1.a" guid="_0e17f357-629d-4ef9-8c8c-2b7ffaee6625" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a participating local government for a distributor-retailer is a party to an infrastructure agreement; and</txt></block></li><li id="sec.154-ssec.1-para1.b" guid="_5606c9b8-ef81-4abc-a49b-edb975e909c6" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the distributor-retailer is not a party to the infrastructure agreement; and</txt></block></li><li id="sec.154-ssec.1-para1.c" guid="_81695ca9-1235-4ec3-87f7-a554585ac126" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the infrastructure agreement relates to a water approval or an application for a water approval under the SEQ Water Act, chapter 4C, part 2.</txt></block></li></list></block></subclause><subclause id="sec.154-ssec.2" guid="_17091246-ea72-43a9-b273-98409f3c7329" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The local government must give a copy of the agreement to the distributor-retailer.</txt></block></subclause></clause><clause id="sec.155" guid="_678cd69c-6238-4885-8a3c-a8b96c1ffa12" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>155</no><heading id="sec.155-he" guid="_96295cfd-9e2c-4e9b-a3e3-f85ea53beb09">When infrastructure agreement binds successors in title</heading><subclause id="sec.155-ssec.1" guid="_5dfc9cc7-9ae4-4737-8082-52a8cb91c2eb" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if the owner of premises to which an infrastructure agreement applies—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.155-ssec.1-para1.a" guid="_5b0e9b08-6545-4396-9dd9-7ce8eeb0ab20" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">is a party to the agreement; or</txt></block></li><li id="sec.155-ssec.1-para1.b" guid="_26ef4acd-9793-4e92-bdf5-8934fc38a0ec" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">consents to the responsibilities under the agreement being attached to the premises.</txt></block></li></list></block></subclause><subclause id="sec.155-ssec.2" guid="_b43acab1-c44b-4d9f-abd4-df2f3e2bca79" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, subsection (1) does not apply to any responsibilities that a public sector entity is to fulfil.</txt></block></subclause><subclause id="sec.155-ssec.3" guid="_b75892d4-9ecb-4896-9dad-09f6e01828d7" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The responsibilities under the infrastructure agreement attach to the premises and bind the owner of the premises and the owner’s successors in title.</txt></block></subclause><subclause id="sec.155-ssec.4" guid="_cbf488f1-782d-4c72-9d72-37cb93cbc7d1" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">If the owner’s consent under subsection (1) is given but not endorsed on the agreement, the owner must give a copy of the document evidencing the owner’s consent to the local government for the premises to which the consent applies.</txt></block></subclause><subclause id="sec.155-ssec.5" guid="_5ba935d8-0fda-4ab4-ab20-b861b28cecba" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">Despite subsection (3), subsections (6) and (7) apply if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.155-ssec.5-para1.a" guid="_a4fdb2d4-ddfb-4b84-b3aa-7924168b2632" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the infrastructure agreement states that if the premises are subdivided, part of the premises is to be released from the responsibilities; and</txt></block></li><li id="sec.155-ssec.5-para1.b" guid="_faab2393-3d43-4804-b4aa-3732f7077e9f" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the premises are subdivided.</txt></block></li></list></block></subclause><subclause id="sec.155-ssec.6" guid="_33357f15-b500-4f90-bfd9-f81f0467575a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">The part is released from the responsibilities.</txt></block></subclause><subclause id="sec.155-ssec.7" guid="_2afe2f99-afbc-4146-8a2f-37333bb09f22" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">The responsibilities are no longer binding on the owner of the part.</txt></block></subclause></clause><clause id="sec.156" guid="_9f1729d6-f6d0-43e2-a239-894e768f79a8" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>156</no><heading id="sec.156-he" guid="_c04429e7-e95f-4cb3-9aa7-93aa0f1d8ad5">Exercise of discretion unaffected by infrastructure agreement</heading><block status="uncommenced"><txt break.before="1">An infrastructure agreement is not invalid merely because its fulfilment depends on the exercise of a discretion by a public sector entity about an existing or future development application.</txt></block></clause><clause id="sec.157" guid="_209509d7-5b08-464c-b66c-a431b2d00004" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>157</no><heading id="sec.157-he" guid="_1658e154-507b-464e-8940-388d2ec5446c">Infrastructure agreement applies instead of approval and charges notice</heading><subclause id="sec.157-ssec.1" guid="_0f52fa55-14f0-406d-9e59-41b20a73751c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">To the extent of any inconsistency, an infrastructure agreement applies instead of—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.157-ssec.1-para1.a" guid="_d3b70d76-cb9a-4fb9-bae0-b84ab8c5d566" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a development approval; or</txt></block></li><li id="sec.157-ssec.1-para1.b" guid="_a86a4506-1f4f-4350-8681-b9dc8410005f" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">an infrastructure charges notice; or</txt></block></li><li id="sec.157-ssec.1-para1.c" guid="_ca00ccbc-754b-4f90-a816-1255ff0c84f3" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">a notice stated in section 301(1).</txt></block></li></list></block></subclause><subclause id="sec.157-ssec.2" guid="_60f8dac0-f74f-430a-ab55-94729c436fee" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, if a State infrastructure provider, other than the chief executive, is a party to the infrastructure agreement, subsection (1) applies only if the chief executive approves the agreement either before or after the development approval or notice is given.</txt></block></subclause><subclause id="sec.157-ssec.3" guid="_61df2ec1-4454-4544-9ca6-b548af3155d9" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The approval of the agreement must be given by notice to all parties to the agreement.</txt></block></subclause><subclause id="sec.157-ssec.4" guid="_0bc3b356-a5a3-4def-ac46-5f159594331d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The approval may be given before or after the agreement is entered into.</txt></block></subclause></clause><clause id="sec.158" guid="_5712a776-1467-4971-8880-defdb1fbbffa" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>158</no><heading id="sec.158-he" guid="_4ea91243-7c10-42f9-9bf9-72554eedd52b">Agreement for infrastructure partnerships</heading><subclause id="sec.158-ssec.1" guid="_6021127f-3c60-4370-92cd-2103860a2b6f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A person may enter into an agreement with a public sector entity about—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.158-ssec.1-para1.a" guid="_6e1a4e03-538f-4781-8d7d-52ead79bef56" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">providing or funding infrastructure; or</txt></block></li><li id="sec.158-ssec.1-para1.b" guid="_a500b3df-e786-47e0-be8f-07f1b9c4ce17" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">refunding payments made towards the cost of providing or funding infrastructure.</txt></block></li></list></block></subclause><subclause id="sec.158-ssec.2" guid="_e15b6cd8-6448-445d-8fe8-cf0756e6e282" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">Subsection (1) has effect despite parts 2 and 3 and chapter 3, part 3, division 3.</txt></block></subclause></clause></part><part id="ch.4-pt.5" guid="_bc46a60b-25c9-46ba-a697-2dd0b364a859" status="uncommenced" affected.by.uncommenced="0"><no>Part 5</no><heading id="ch.4-pt.5-he" guid="_9e3587fc-7506-40c3-9258-93703aca5b1f">Miscellaneous</heading><clause id="sec.159" guid="_5f432219-6ff6-4fd0-8463-41dfb953d271" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>159</no><heading id="sec.159-he" guid="_1972af74-a9c4-4d19-8066-b28e91de2e90">Particular local government land held on trust</heading><subclause id="sec.159-ssec.1" guid="_6753b28b-0b92-47fe-b6d7-7c13d010263b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">Land given to, or taken by, a local government for public parks infrastructure or local community facilities under this chapter must be given or taken in fee simple on trust.</txt></block></subclause><subclause id="sec.159-ssec.2" guid="_1c6a3fb6-2999-4471-b67b-edd6146239f2" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">If the local government later sells the land—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.159-ssec.2-para1.a" guid="_162dca5d-face-445f-982c-f87b7aa3807a" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the land is sold free of the trust; and</txt></block></li><li id="sec.159-ssec.2-para1.b" guid="_af0cde5f-e632-49a9-9f9a-61ffc2008991" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the net proceeds of the sale must be used to provide trunk infrastructure.</txt></block></li></list></block></subclause></clause></part></chapter><chapter id="ch.5" guid="_510ac015-1c99-4a3a-ac53-5e5f1e2ee53c" status="uncommenced" affected.by.uncommenced="0"><no>Chapter 5</no><heading id="ch.5-he" guid="_2aa9f4b7-1dde-43bf-a98d-a67af807dd15">Offences and enforcement</heading><part id="ch.5-pt.1" guid="_c8098d06-e019-487f-ba3d-c50552277c50" status="uncommenced" affected.by.uncommenced="0"><no>Part 1</no><heading id="ch.5-pt.1-he" guid="_e8faf811-a9f1-46c4-b3c1-3672f48a81d5">Introduction</heading><clause id="sec.160" guid="_73d63e47-62b9-41f6-8d35-b2ac7dacb065" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>160</no><heading id="sec.160-he" guid="_9f7326ec-1205-41d3-beea-53c3875dfbbd">What this chapter is about</heading><subclause id="sec.160-ssec.1" guid="_7934591e-69d5-4ebf-9385-30eba88aeda6" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This chapter is about offences against this Act, including development offences, and ways to prevent or remedy the effect of those offences.</txt></block></subclause><subclause id="sec.160-ssec.2" guid="_2debe93a-2db6-4844-a20b-3827627291fd" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">Part 2 creates development offences.</txt></block></subclause><subclause id="sec.160-ssec.3" guid="_eb4a06c4-bdde-428c-8277-30543d39f69d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">Part 3 is about notices from an enforcement authority requiring a person to refrain from committing a development offence, or to remedy the effect of a development offence.</txt></block></subclause><subclause id="sec.160-ssec.4" guid="_33cbdf34-621b-4f4c-bdf3-f77e9c336882" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">Part 4 is about proceedings in a Magistrates Court for development offences and other offences against this Act.</txt></block></subclause><subclause id="sec.160-ssec.5" guid="_750eced7-f80e-4169-9104-9831ff08d0ff" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">Part 5 is about orders made by the P&#38;E Court requiring a person not to commit a development offence, or to remedy the effect of a development offence.</txt></block></subclause><subclause id="sec.160-ssec.6" guid="_a00bce47-ca92-44af-bf3c-b0c5e1507719" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">Parts 6 to 8 are about inspectors, their powers for enforcement, and related matters.</txt></block></subclause><subclause id="sec.160-ssec.7" guid="_61bd3f24-bd1c-4b4b-b976-27d6da763ce8" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">Part 9 contains miscellaneous provisions about offences and enforcement.</txt></block></subclause></clause></part><part id="ch.5-pt.2" guid="_551ded18-2744-49a9-a32d-3d849c2302af" status="uncommenced" affected.by.uncommenced="0"><no>Part 2</no><heading id="ch.5-pt.2-he" guid="_721a1368-db15-4c49-88ba-c5ed46ae70bc">Development offences</heading><clause id="sec.161" guid="_5df7e672-00ba-4501-ba0d-b51f03dc9f39" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>161</no><heading id="sec.161-he" guid="_232058a8-4836-41e7-9ab4-2a7c3a5e1afc">What part is about</heading><block status="uncommenced"><txt break.before="1">This part creates offences (each a <defterm id="def.developmentoffence" guid="_3fee75e7-2b83-4f15-b291-8aac4cb5a1ea" type="definition">development offence</defterm>), subject to any exemption under this part or to chapter 7, part 1.</txt></block></clause><clause id="sec.162" guid="_66063c0d-7484-4a6e-b70a-031e46565958" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>162</no><heading id="sec.162-he" guid="_23fd27d1-88a1-4871-b4d3-f502ef384d19">Carrying out prohibited development</heading><block status="uncommenced"><txt break.before="1">A person must not carry out prohibited development, unless—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.162-para1.a" guid="_2485994c-bf66-4f26-96bd-60ddc346dfa5" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the development is carried out under a development approval given for a superseded planning scheme application; or</txt></block></li><li id="sec.162-para1.b" guid="_e0569a50-6014-4b49-bf5e-04690577f078" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the local government for the area in which the development is carried out has agreed, or is taken to have agreed, to a request under section 29(4)(b) for the development.</txt></block></li></list><penalty id="sec.162-pen" guid="_07785c31-55b7-4c78-ac6f-4c4f5d082bcf"><block status="uncommenced"><txt break.before="1">Maximum penalty—4500 penalty units.</txt></block></penalty></block></clause><clause id="sec.163" guid="_a4772e82-349b-4384-ab9e-8b5da0642050" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>163</no><heading id="sec.163-he" guid="_9814b42b-5109-4e03-8e64-23c18d4ce1b6">Carrying out assessable development without permit</heading><subclause id="sec.163-ssec.1" guid="_0ec8c4a2-a9cf-4a83-9fc4-b7b31b3e6b67" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A person must not carry out assessable development, unless all necessary development permits are in effect for the development.</txt></block><penalty id="sec.163-ssec.1-pen" guid="_aa62a806-712e-4bf4-bc1d-ab59003133fc"><block status="uncommenced"><txt break.before="1">Maximum penalty—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.163-ssec.1-pen-para1.a" guid="_c28130a0-d0ca-4544-b7d5-b02bcaac90af" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if the assessable development is on a Queensland heritage place or local heritage place—17,000 penalty units; or</txt></block></li><li id="sec.163-ssec.1-pen-para1.b" guid="_fed1fea7-f27f-48a4-accb-d4cc26aa72f8" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">otherwise—4500 penalty units.</txt></block></li></list></block></penalty></subclause><subclause id="sec.163-ssec.2" guid="_d46a1b75-fb2d-4948-b71e-e4502c0c2d4d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, subsection (1) does not apply to development carried out—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.163-ssec.2-para1.a" guid="_88174fb5-4b7b-44d5-9eb5-1d1a099f8e21" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">under section 29(10)(a); or</txt></block></li><li id="sec.163-ssec.2-para1.b" guid="_aec4a3b3-f9d2-412a-babd-0878229296d1" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">in accordance with an exemption certificate under section 46; or</txt></block></li><li id="sec.163-ssec.2-para1.c" guid="_d7f5ebea-8574-47bd-a272-51464a9e7c5b" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">under section 88(3).</txt></block></li></list></block></subclause></clause><clause id="sec.164" guid="_b5a5b95d-43d0-4977-b285-31aaaaf634e4" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>164</no><heading id="sec.164-he" guid="_3689eaf3-a340-450c-acd4-df72b40ce30d">Compliance with development approval</heading><block status="uncommenced"><txt break.before="1">A person must not contravene a development approval.</txt><penalty id="sec.164-pen" guid="_4f0487c1-0888-4515-aa8e-67b3d064c3f8"><block status="uncommenced"><txt break.before="1">Maximum penalty—4500 penalty units.</txt></block></penalty></block></clause><clause id="sec.165" guid="_b1538e64-7b4c-4623-a4c9-75cd3eaf6acc" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>165</no><heading id="sec.165-he" guid="_162249d8-df12-424d-ad23-d505db91374c">Unlawful use of premises</heading><block status="uncommenced"><txt break.before="1">A person must not use premises unless the use—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.165-para1.a" guid="_f066a27c-fe49-45b3-a0f7-f7cd2e5c37ae" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">is a lawful use; or</txt></block></li><li id="sec.165-para1.b" guid="_115052ce-8e11-4586-82c1-752f7074dc41" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for designated premises—complies with any requirements about the use of the premises in the designation.</txt></block></li></list><penalty id="sec.165-pen" guid="_b972d4f7-1bb0-4ab8-96a5-4198ab0ec8c7"><block status="uncommenced"><txt break.before="1">Maximum penalty—4500 penalty units.</txt></block></penalty></block></clause><clause id="sec.166" guid="_31cb59cf-fb47-474c-b45d-787363bfb020" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>166</no><heading id="sec.166-he" guid="_f77c3739-fea5-4e34-bb21-8a93d5b165d4">Exemptions if emergency causing safety concern</heading><subclause id="sec.166-ssec.1" guid="_10d0b2eb-28ab-4053-aaf6-cd753f1c2201" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to works, development or a use (an <defterm id="sec.166-def.activity" guid="_82b6997a-6668-4776-83d3-86f31f891738" type="definition">activity</defterm>) carried out because an emergency endangers—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.166-ssec.1-para1.a" guid="_efe895bd-8306-428c-b8f3-3742848e8a2c" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a person’s life or health; or</txt></block></li><li id="sec.166-ssec.1-para1.b" guid="_25a1d9ba-79d6-4266-93a8-94e004f15577" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a building’s structural safety; or</txt></block></li><li id="sec.166-ssec.1-para1.c" guid="_d8ab6958-8da4-4a17-a1f6-99b6c86a4b6b" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the operation or safety of infrastructure, other than a building; or</txt></block></li><li id="sec.166-ssec.1-para1.d" guid="_c41c3c35-c86a-4c3a-8357-74e533e95300" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">for tidal works—the structural safety of a structure for which there is a development permit for operational work that is tidal works.</txt></block></li></list></block></subclause><subclause id="sec.166-ssec.2" guid="_909ab7e2-d5a5-424a-afe3-576ce45ed749" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">A person who, in an emergency, is carrying out necessary operational work that is tidal works does not commit a development offence, other than an offence against section 162, if the person—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.166-ssec.2-para1.a" guid="_fca3930b-b250-46e0-b88c-41d5c10aa4b5" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">has made a safety management plan for the works, after considering—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.166-ssec.2-para1.a-para2.i" guid="_4dd191cc-c7cb-43c1-a5e8-4c6e03fb3bab" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the long-term safety of members of the public who have access to the works or a structure to which the works relate; and</txt></block></li><li id="sec.166-ssec.2-para1.a-para2.ii" guid="_af4401ef-072b-42a8-88d4-ba4eb96d13b4" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">if practicable, the advice of a registered professional engineer who has audited the works or structure; and</txt></block></li></list></block></li><li id="sec.166-ssec.2-para1.b" guid="_d51def9c-f598-47b3-95de-8f000bd30998" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">complies with the plan; and</txt></block></li><li id="sec.166-ssec.2-para1.c" guid="_9e00202d-5fc0-460a-8af9-425985f18a6b" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">gives a copy of the plan to the enforcement authority as soon as reasonably practicable after starting the works; and</txt></block></li><li id="sec.166-ssec.2-para1.d" guid="_155f89d2-717e-4191-8465-1081d81f18f3" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">takes reasonable precautions and exercises proper diligence to ensure the works or a structure to which the works relate are in a safe condition, including by engaging a registered professional engineer to audit the works or structure.</txt></block></li></list></block></subclause><subclause id="sec.166-ssec.3" guid="_2d48acee-307e-4493-bf89-a9d1240e9109" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">A person who, in an emergency, is carrying out necessary building work on a Queensland heritage place, or local heritage place, does not commit a development offence, other than an offence against section 162, if the person—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.166-ssec.3-para1.a" guid="_7723b1d3-5951-40b1-9825-a67c83cbff25" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">gets the advice of a registered professional engineer about the works before starting the works, unless it is not practicable to do so; and</txt></block></li><li id="sec.166-ssec.3-para1.b" guid="_894ac508-becd-4a3f-8a41-c1268095fda0" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">takes all reasonable steps—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.166-ssec.3-para1.b-para2.i" guid="_768db508-f22a-4e3c-b0c1-fc63227aaff3" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">to ensure the works are reversible; or</txt></block></li><li id="sec.166-ssec.3-para1.b-para2.ii" guid="_4d79d0b7-d043-4e14-9fa4-10ccdd70ce71" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">if the works are not reversible—to minimise the impact of the works on the place’s cultural heritage significance.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.166-ssec.4" guid="_fe593f9e-5f84-4614-a086-17e3b292763b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">A person who, in an emergency, is carrying out any other necessary activity does not commit a development offence if the person gives notice that the person has been carrying out the activity, as soon as reasonably practicable after starting the activity, to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.166-ssec.4-para1.a" guid="_6706a9b3-e32a-4df8-b89f-c551eb7e5f1c" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the enforcement authority; and</txt></block></li><li id="sec.166-ssec.4-para1.b" guid="_36834a62-7fe3-4b78-a0af-a5ae9380b717" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a person who must be given notice of the activity under another Act.</txt></block></li></list></block></subclause><subclause id="sec.166-ssec.5" guid="_21f930d4-9727-45fa-9a1a-b611f7334252" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">Subsections (2), (3) and (4) stop applying to a person carrying out an activity if an enforcement notice or order requires the activity to stop.</txt></block></subclause><subclause id="sec.166-ssec.6" guid="_fcc8172e-213f-4cec-95c6-0a04758ff4b1" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">Subsections (2) and (3) stop applying to a person carrying out the activity if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.166-ssec.6-para1.a" guid="_812d0298-f52c-4e83-9d20-8ae11a3d7fbd" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the person does not, as soon as reasonably practicable after starting the activity—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.166-ssec.6-para1.a-para2.i" guid="_8995bdcf-974c-47ce-9323-b7a7fd3f94a5" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">make a development application that, but for the exemption, would be required for the activity; and</txt></block></li><li id="sec.166-ssec.6-para1.a-para2.ii" guid="_f44cd7d2-04b1-46e7-a94c-43e837ad64a1" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">give a notice of a type mentioned in subsection (4); or</txt></block></li></list></block></li><li id="sec.166-ssec.6-para1.b" guid="_405848f6-c909-43fd-a3e8-2819821ec0b8" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the person complies with paragraph (a), but the person’s development application is refused.</txt></block></li></list></block></subclause><subclause id="sec.166-ssec.7" guid="_8b7c35d7-3909-49ab-bfab-c3c041bdf3d4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">If the person’s development application is refused, the person must restore, as far as practicable, premises to the condition the premises were in immediately before the activity was carried out.</txt></block><penalty id="sec.166-ssec.7-pen" guid="_5e5d875e-950f-47fe-bca1-d0220cdfa6ea"><block status="uncommenced"><txt break.before="1">Maximum penalty—4500 penalty units.</txt></block></penalty></subclause><subclause id="sec.166-ssec.8" guid="_33b1bd99-eee6-4e5a-a8f5-4dc2be4c7fba" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(8)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.166-ssec.8-def.emergency_" guid="_903f9094-6adf-4299-99db-c6b5929d4ffc" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.166-ssec.8-def.emergency" guid="_ec5b3fc4-85e8-433b-b364-dedd888a7847" type="definition">emergency</defterm> means an event or situation that involves an imminent and definite threat requiring immediate action (whether before, during or after the event or situation), other than routine maintenance due to wear and tear.</txt><note id="sec.166-ssec.8-def.emergency-note" guid="_35d331c2-5974-4093-af03-66d32074d843" type="example"><heading id="sec.166-ssec.8-def.emergency-note-he" guid="_38f3f2ff-9285-4d82-9fe6-27fafb97e1f7">Example of an action not done because of an emergency—</heading><block status="uncommenced"><txt break.before="1">the carrying out, in winter, of a use or of building or operational work in anticipation of the next cyclone season</txt></block></note></definition><definition id="sec.166-ssec.8-def.necessary_" guid="_f9b2efc2-1420-47d2-b072-43fef300404c" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.166-ssec.8-def.necessary" guid="_f1fa70bd-34bc-453b-a7d2-6fb6cb8b2c47" type="definition">necessary</defterm>, in relation to an activity, means the activity is necessary to ensure the emergency does not, or is not likely to, endanger someone or something stated in subsection (1)(a) to (d).</txt></definition><definition id="sec.166-ssec.8-def.registeredprofessionalengineer_" guid="_307d6fe9-5452-4380-a2fe-1cb57dee29c7" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.166-ssec.8-def.registeredprofessionalengineer" guid="_2b8b20f3-5715-4716-a97d-fd16ea54a025" type="definition">registered professional engineer</defterm> means—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.166-ssec.8-def.registeredprofessionalengineer-para1.a" guid="_f9a4bbd0-dafa-4cf8-a127-4bca671d589b" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a registered professional engineer under the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Professional Engineers Act 2002</name></legref>; or</txt></block></li><li id="sec.166-ssec.8-def.registeredprofessionalengineer-para1.b" guid="_d024ebaf-e9e7-4c12-9997-653e106ff4ae" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a person registered as a professional engineer under an Act of another State.</txt></block></li></list></definition></deflist></block></subclause></clause></part><part id="ch.5-pt.3" guid="_bd6cc405-42b9-4bd1-a8cb-356d11f99ced" status="uncommenced" affected.by.uncommenced="0"><no>Part 3</no><heading id="ch.5-pt.3-he" guid="_8b85b178-67a6-4ada-b86e-86c0b00fd6ab">Enforcement notices</heading><clause id="sec.167" guid="_3df81a17-3f76-4aa9-b757-9825df0c548f" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>167</no><heading id="sec.167-he" guid="_c5d384d1-e89d-4458-a481-126a0565d816">Show cause notices</heading><subclause id="sec.167-ssec.1" guid="_af687f4a-12eb-446b-84c8-438fcf01bae3" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if an enforcement authority—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.167-ssec.1-para1.a" guid="_5db721d6-b5ce-4e5c-8d9e-6dd18abd1d13" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">reasonably believes a person has committed, or is committing, a development offence; and</txt></block></li><li id="sec.167-ssec.1-para1.b" guid="_d96c8149-7f02-4c5c-ac36-fcf239d6dd89" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">is considering giving an enforcement notice for the offence to the person.</txt></block></li></list></block></subclause><subclause id="sec.167-ssec.2" guid="_6792da10-db1c-4854-8ec6-34e1337aec2e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The enforcement authority must give the person a notice (a <defterm id="sec.167-def.showcausenotice" guid="_99faa271-e167-4d42-ace0-50a3a3049bd8" type="definition">show cause notice</defterm>) that—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.167-ssec.2-para1.a" guid="_798501d2-5d3f-443d-bd37-c30f49a4cd74" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">states the enforcement authority is considering giving an enforcement notice to the person; and</txt></block></li><li id="sec.167-ssec.2-para1.b" guid="_b822af97-76b7-4ba7-95ed-3533afe3628c" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">outlines the facts and circumstances that form the basis for the enforcement authority’s reason for giving an enforcement notice; and</txt></block></li><li id="sec.167-ssec.2-para1.c" guid="_78fb4114-9c4e-4861-ba32-ef13dcffad45" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">states the person may make representations about the notice to the enforcement authority; and</txt></block></li><li id="sec.167-ssec.2-para1.d" guid="_0e44a0de-7f1f-42e2-af28-d15255e76a19" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">states how the representations may be made; and</txt></block></li><li id="sec.167-ssec.2-para1.e" guid="_7ba16113-4cb0-4eee-a3f8-b5052580a6d4" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">states—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.167-ssec.2-para1.e-para2.i" guid="_488295eb-b825-4509-b47c-71b6ccb3dadc" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a day and time for making the representations; or</txt></block></li><li id="sec.167-ssec.2-para1.e-para2.ii" guid="_84930c37-c59c-4acc-983f-c5d9707f68a4" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">a period within which the representations must be made.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.167-ssec.3" guid="_e94b0ffa-e584-414b-914b-50505c31ec3c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The day or period stated in the show cause notice must be, or must end, at least 20 business days after the notice is given.</txt></block></subclause><subclause id="sec.167-ssec.4" guid="_424b67cc-9d97-4966-9537-77382e6396dd" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">After considering any representations made by the person as required under the show cause notice, the enforcement authority may give the enforcement notice if the enforcement authority still considers it appropriate to do so.</txt></block></subclause><subclause id="sec.167-ssec.5" guid="_50513a6d-8ce1-4211-b19d-e02ae6ea0ba4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">An enforcement authority need not give a show cause notice to the person, before giving the person an enforcement notice, if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.167-ssec.5-para1.a" guid="_193a8555-a5a0-4a24-9308-7830b942680f" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the development offence relates to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.167-ssec.5-para1.a-para2.i" guid="_4c68b61b-17f7-473b-a250-bec9a575da05" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a Queensland heritage place or a local heritage place; or</txt></block></li><li id="sec.167-ssec.5-para1.a-para2.ii" guid="_94ec0e97-99c1-4256-aa2b-a11ead26ae07" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">works that the enforcement authority reasonably believes are a danger to persons or a risk to public health; or</txt></block></li><li id="sec.167-ssec.5-para1.a-para2.iii" guid="_54beb714-1c70-42aa-9779-fa07d143840f" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">the demolition of works; or</txt></block></li><li id="sec.167-ssec.5-para1.a-para2.iv" guid="_53246710-5ba1-499d-b096-ab601738e6e2" status="uncommenced" provision.type="other"><no>(iv)</no><block status="uncommenced"><txt break.before="1">the clearing of vegetation; or</txt></block></li><li id="sec.167-ssec.5-para1.a-para2.v" guid="_eb82a2cb-0a4f-4295-ac23-9e5ffc0c1f76" status="uncommenced" provision.type="other"><no>(v)</no><block status="uncommenced"><txt break.before="1">the removal of quarry material allocated under the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Water Act 2000</name></legref>; or</txt></block></li><li id="sec.167-ssec.5-para1.a-para2.vi" guid="_899daa66-692d-4b87-b6b6-16b6f607d1c9" status="uncommenced" provision.type="other"><no>(vi)</no><block status="uncommenced"><txt break.before="1">extracting clay, gravel, rock, sand or soil, not stated in subparagraph (v), from Queensland waters; or</txt></block></li><li id="sec.167-ssec.5-para1.a-para2.vii" guid="_c0e14f74-7174-44b2-96ff-5f90e842c29e" status="uncommenced" provision.type="other"><no>(vii)</no><block status="uncommenced"><txt break.before="1">development that the enforcement authority reasonably believes is causing erosion, sedimentation or an environmental nuisance (as defined in the <legref jurisd="QLD" type="act" check="unknown">Environmental Protection Act</legref>, section 15); or</txt></block></li></list></block></li><li id="sec.167-ssec.5-para1.b" guid="_b00cf3f3-8fda-4fec-852a-538d5fc2c112" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the enforcement authority reasonably believes it is not appropriate in the circumstances to give the show cause notice (because the notice is likely to adversely affect the effectiveness of the enforcement notice, for example).</txt></block></li></list></block></subclause></clause><clause id="sec.168" guid="_e840e0eb-20d7-4232-9e5c-bae8b5f9e0e4" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>168</no><heading id="sec.168-he" guid="_d218c2b4-4df3-4089-8f6b-119f4136d819">Enforcement notices</heading><subclause id="sec.168-ssec.1" guid="_725f4ed2-d2a6-4050-967c-756b59d82374" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">If an enforcement authority reasonably believes a person has committed, or is committing, a development offence, the authority may give an enforcement notice to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.168-ssec.1-para1.a" guid="_b111b088-423a-4b5a-80ea-0a65838942b0" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the person; and</txt></block></li><li id="sec.168-ssec.1-para1.b" guid="_9aa4bf9f-f5e1-4448-9524-e664a40ce82f" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the offence involves premises and the person is not the owner of the premises—the owner of the premises.</txt></block></li></list></block></subclause><subclause id="sec.168-ssec.2" guid="_35e89966-3d79-4195-b454-0c953661a406" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">An <defterm id="sec.168-def.enforcementnotice" guid="_2125c06d-c4ae-47c4-b58e-6894a394bf4f" type="definition">enforcement notice</defterm> is a notice that requires a person to do either or both of the following—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.168-ssec.2-para1.a" guid="_cd2b3bbd-889d-4938-a661-75e57fade344" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">to refrain from committing a development offence;</txt></block></li><li id="sec.168-ssec.2-para1.b" guid="_2978f55a-0261-4626-b2b5-b563ca40ae5c" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">to remedy the effect of a development offence in a stated way.</txt></block></li></list></block><note id="sec.168-ssec.2-note" guid="_ab5abfe2-556b-4442-9295-574563bf6c19" type="example"><heading id="sec.168-ssec.2-note-he" guid="_debc50f2-016d-42fa-941a-54e481f3f85c">Examples of what an enforcement notice may require—</heading><block status="uncommenced"><txt break.before="1">The notice may require a person do any or all of the following on or before a stated time or within a stated period—</txt><list number.type="bull" unnumbered.indent="0"><li id="sec.168-ssec.2-note-para1" guid="_5c36186b-4ada-499f-bd31-6472e165fb83" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">to stop carrying out development</txt></block></li><li id="sec.168-ssec.2-note-para1-oc.2" guid="_3decaac9-d6e1-476d-ab1a-108622be7e94" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">to demolish or remove development</txt></block></li><li id="sec.168-ssec.2-note-para1-oc.3" guid="_368fa407-5e11-4725-beb5-fb7b4a6b4deb" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">to restore, as far as practicable, premises to the condition the premises were in immediately before development was started</txt></block></li><li id="sec.168-ssec.2-note-para1-oc.4" guid="_9f3ecce0-ad6b-48e9-b340-dff35b777203" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">to do, or not to do, another act to ensure development complies with a development permit</txt></block></li><li id="sec.168-ssec.2-note-para1-oc.5" guid="_68534a43-3a01-49b5-95df-bf8c48df3be0" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">if the enforcement authority reasonably believes works are dangerous, to repair or rectify the works, to secure the works, or to fence the works off to protect people</txt></block></li><li id="sec.168-ssec.2-note-para1-oc.6" guid="_a2ef14e1-80e1-4984-84a3-ef2627d3bf8d" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">to stop a stated use of premises</txt></block></li><li id="sec.168-ssec.2-note-para1-oc.7" guid="_a79f48d8-6d4a-4982-a9c8-f0e9dbe255e2" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">to apply for a development permit</txt></block></li><li id="sec.168-ssec.2-note-para1-oc.8" guid="_a9389cbf-f685-4af7-b037-244f6bcdf3c0" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">to give the enforcement authority a compliance program that shows how compliance with the enforcement notice will be achieved.</txt></block></li></list></block></note></subclause><subclause id="sec.168-ssec.3" guid="_9faefd35-5a9f-45e7-8a2a-e4092e3f0aa0" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The notice must state—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.168-ssec.3-para1.a" guid="_f6be920e-e1e2-421a-9d10-8d5f44759657" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the nature of the alleged offence; and</txt></block></li><li id="sec.168-ssec.3-para1.b" guid="_ad46dc2b-21cf-407f-a765-fb8af372307f" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the notice requires the person not to do an act—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.168-ssec.3-para1.b-para2.i" guid="_689f229a-d405-4706-8777-fb5d039e1274" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the period for which the requirement applies; or</txt></block></li><li id="sec.168-ssec.3-para1.b-para2.ii" guid="_5fb1469c-416a-423c-8211-e61f716a3189" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">that the requirement applies until further notice; and</txt></block></li></list></block></li><li id="sec.168-ssec.3-para1.c" guid="_9a41c4b5-3298-4e4b-a25a-76d0f863414a" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">if the notice requires the person to do an act—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.168-ssec.3-para1.c-para2.i" guid="_8fddabfd-aef7-4eb4-a70e-f9fcd71a3d3f" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the details of the act; and</txt></block></li><li id="sec.168-ssec.3-para1.c-para2.ii" guid="_440578ae-ec7a-416e-b96a-9e45e83fca64" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the period within which the act must be done; and</txt></block></li></list></block></li><li id="sec.168-ssec.3-para1.d" guid="_9122c31c-ed53-440e-9227-0542277598f8" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">that the person has an appeal right against the giving of the notice.</txt></block></li></list></block></subclause><subclause id="sec.168-ssec.4" guid="_cb68d30e-cf03-41b3-a968-548acc7021b2" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The notice may require demolition or removal of all or part of works if the enforcement authority reasonably believes it is not possible or practical to take steps—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.168-ssec.4-para1.a" guid="_6eb3b6ef-d24c-498c-a022-4ef1399cc809" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">to make the development accepted development; or</txt></block></li><li id="sec.168-ssec.4-para1.b" guid="_8e051d06-eb9a-4ee9-8747-b34f862a4609" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">to make the works comply with a development approval; or</txt></block></li><li id="sec.168-ssec.4-para1.c" guid="_e82f143a-c814-48a2-a528-16d05f3292b5" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">if the works are dangerous—to remove the danger.</txt></block></li></list></block></subclause><subclause id="sec.168-ssec.5" guid="_fd417746-7690-4a3c-a908-40df566f0e7c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">A person must not contravene an enforcement notice.</txt><penalty id="sec.168-ssec.5-pen" guid="_e867976e-b666-4360-a4df-85b6766a42ea"><block status="uncommenced"><txt break.before="1">Maximum penalty—4500 penalty units.</txt></block></penalty></block></subclause><subclause id="sec.168-ssec.6" guid="_f846a054-f82e-4169-824d-49b17b8722bb" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">An enforcement notice that requires development on premises to stop being carried out may be given by fixing the notice to the premises in a way that a person entering the premises would normally see the notice.</txt></block></subclause><subclause id="sec.168-ssec.7" guid="_04b398e8-9386-46e2-a51d-f456f2f3c390" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">A person must not deal with an enforcement notice stated in subsection (6) in a way that is reasonably likely to prevent the recipient seeing the notice.</txt><penalty id="sec.168-ssec.7-pen" guid="_2cda9820-0149-49a5-bf9d-da4d54345fa1"><block status="uncommenced"><txt break.before="1">Maximum penalty—4500 penalty units.</txt></block></penalty></block></subclause></clause><clause id="sec.169" guid="_d3e0509c-50a0-40ec-a55e-afbb805ab352" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>169</no><heading id="sec.169-he" guid="_7c950988-c679-4217-975e-2ae6642aa243">Consulting private certifier about enforcement notice</heading><subclause id="sec.169-ssec.1" guid="_e8d4222e-8a85-4ff2-bfe9-3735887e5d82" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if a private certifier is engaged in relation to development.</txt></block></subclause><subclause id="sec.169-ssec.2" guid="_0d51bd3b-afa4-4605-a2be-6494f8530730" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The enforcement authority must not give an enforcement notice for that part of the development for which the private certifier is engaged until the authority has consulted about the giving of the notice with—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.169-ssec.2-para1.a" guid="_19ab3078-02ae-498a-bdc9-a99a382c5d0e" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the private certifier; or</txt></block></li><li id="sec.169-ssec.2-para1.b" guid="_209587cf-fd64-4b66-8bf0-9ac0c1748623" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the enforcement authority is the private certifier—the local government.</txt></block></li></list></block></subclause><subclause id="sec.169-ssec.3" guid="_769ebf51-fe35-4e96-a949-eae0b068c98b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">However, subsection (2) does not apply if the enforcement authority reasonably believes the works for which the enforcement notice is to be given are dangerous.</txt></block></subclause><subclause id="sec.169-ssec.4" guid="_9537a764-222d-4517-a8da-2bd20f6554a1" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">If the enforcement authority is the private certifier, the authority may not delegate power to give an enforcement notice that orders the demolition of a building.</txt></block></subclause><subclause id="sec.169-ssec.5" guid="_92494b35-60c0-4d8e-869e-e92fa3fba483" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The enforcement authority may carry out consultation under this section in the way the enforcement authority considers appropriate.</txt></block></subclause></clause><clause id="sec.170" guid="_4a272ff5-6ab7-480c-b49e-3162728502e2" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>170</no><heading id="sec.170-he" guid="_b1223354-ef19-473a-843b-ec8c68e4d7df">Notifying about show cause and enforcement notices</heading><subclause id="sec.170-ssec.1" guid="_e0144a03-0c59-4735-8acb-79b768a34426" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if the enforcement authority gives a show cause notice or enforcement notice to a person.</txt></block></subclause><subclause id="sec.170-ssec.2" guid="_b3d28d52-68c3-48c6-a965-381960dffbf2" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">If—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.170-ssec.2-para1.a" guid="_2556a90a-add9-479f-b7c9-71ea3a84da7a" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the notice relates to development in relation to which a local government could have been the assessment manager, but was not the assessment manager; and</txt></block></li><li id="sec.170-ssec.2-para1.b" guid="_b798117a-1eba-4087-8eda-9e1bd720d609" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the enforcement authority is not the local government;</txt></block></li></list></block><block status="uncommenced"><txt break.before="1">the enforcement authority must give a copy of the notice to the local government.</txt></block></subclause><subclause id="sec.170-ssec.3" guid="_11c3168e-7808-4b26-9a9a-06ff589041de" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">If—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.170-ssec.3-para1.a" guid="_fc571164-0a1c-4d3d-bca1-fdc823a83a84" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the notice relates to development in relation to which the chief executive could have been the assessment manager, but was not the assessment manager; and</txt></block></li><li id="sec.170-ssec.3-para1.b" guid="_872c5b53-b78e-4fab-9984-32a286b8c005" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the enforcement authority is not the chief executive;</txt></block></li></list></block><block status="uncommenced"><txt break.before="1">the enforcement authority must give a copy of the notice to the chief executive.</txt></block></subclause><subclause id="sec.170-ssec.4" guid="_78c793f0-3568-4098-b06b-6a7a47d35181" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">If the enforcement authority withdraws the show cause notice or enforcement notice, the enforcement authority must give notice of the withdrawal to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.170-ssec.4-para1.a" guid="_ea740ed8-37d6-4f3c-b828-76a56b58135d" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for a notice given under subsection (2)—the local government; or</txt></block></li><li id="sec.170-ssec.4-para1.b" guid="_91fcd9d3-3de4-477b-a1bb-dda69c2b39ef" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for a notice given under subsection (3)—the chief executive.</txt></block></li></list></block></subclause><subclause id="sec.170-ssec.5" guid="_79806869-f5ff-4f80-a8aa-95593dc389d7" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">A failure to comply with subsection (2) or (3) does not invalidate or otherwise affect the show cause notice or enforcement notice.</txt></block></subclause></clause><clause id="sec.171" guid="_d6c3b642-384f-4928-96b5-4a6ab951a943" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>171</no><heading id="sec.171-he" guid="_95ae28c1-f140-4966-ab6b-6a0e6c6a2ad4">Stay of enforcement notice</heading><subclause id="sec.171-ssec.1" guid="_0d8e5a91-638d-42d0-8776-5cb860d9f89d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">An appeal against an enforcement notice stays the operation of the notice until—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.171-ssec.1-para1.a" guid="_e71330f9-747d-4593-bd4c-9b27d364ed9b" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the tribunal or court hearing the appeal decides otherwise; or</txt></block></li><li id="sec.171-ssec.1-para1.b" guid="_99555e2c-9b18-4150-81fa-a8c236de62df" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the appeal ends.</txt></block></li></list></block></subclause><subclause id="sec.171-ssec.2" guid="_6ee2bcee-fdb6-4e39-96cf-5fb48bde46a8" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, the notice is not stayed to the extent the notice is about a matter stated in section 167(5)(a). </txt></block></subclause></clause><clause id="sec.172" guid="_32163990-9bfe-4fce-9d92-3491d6508257" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>172</no><heading id="sec.172-he" guid="_29be97d2-cea4-4e29-9ab3-d9bde2895dbf">Application in response to show cause or enforcement notice</heading><block status="uncommenced"><txt break.before="1">If a person applies for a development permit in response to a show cause notice, or as required by an enforcement notice, the person—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.172-para1.a" guid="_f17174b2-e260-419b-b2ce-e3b8b5088fe7" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">must not withdraw the application, unless the person has a reasonable excuse; and</txt></block></li><li id="sec.172-para1.b" guid="_2b2e08bd-e6b2-4fd1-8c09-ba1365ee5830" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">must take all necessary and reasonable steps to enable the application to be decided as soon as practicable, unless the person has a reasonable excuse; and</txt></block></li><li id="sec.172-para1.c" guid="_a456c633-3c0e-473b-9e3b-944944cbf0dd" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">if the person appeals the decision on the application—must take all necessary and reasonable steps to enable the appeal to be decided as soon as practicable, unless the person has a reasonable excuse.</txt></block></li></list><penalty id="sec.172-pen" guid="_e003c7e5-5a99-4fbf-8f09-450380ff73fd"><block status="uncommenced"><txt break.before="1">Maximum penalty—4500 penalty units.</txt></block></penalty></block></clause><clause id="sec.173" guid="_622ace14-8a7a-4680-9c87-510abbc84261" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>173</no><heading id="sec.173-he" guid="_358c405c-d2d0-40d8-8529-a1188b704f1d">Enforcement authority may remedy contravention</heading><subclause id="sec.173-ssec.1" guid="_696d16bb-a617-4d4e-9d69-29c22f21bd84" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if an enforcement notice is contravened and the enforcement authority is not a local government.</txt><note id="sec.173-ssec.1-note" guid="_e5507c5d-171f-4216-ba64-6338eb7c656d" type="example"><heading id="sec.173-ssec.1-note-he" guid="_ecd0c2c7-ced3-4a45-adbd-43d6e7e10929">Note—</heading><block status="uncommenced"><txt break.before="1">If the enforcement authority is a local government, see the <legref jurisd="QLD" type="act" check="unknown">Local Government Act</legref>, section 142 or the <legref jurisd="QLD" type="act" check="unknown">City of Brisbane Act</legref>, section 132.</txt></block></note></block></subclause><subclause id="sec.173-ssec.2" guid="_e5434068-727c-4c92-bc46-43c9147dc795" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The enforcement authority may—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.173-ssec.2-para1.a" guid="_3ae47f82-4af0-441f-acaa-773b4aea0bb5" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">do anything reasonably necessary to ensure the notice is complied with; and</txt></block></li><li id="sec.173-ssec.2-para1.b" guid="_6d18853c-22fb-40ae-a4a0-2c2a88b0f833" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">recover any reasonable costs and expenses incurred in doing so as a debt owing by the recipient to the authority.</txt></block></li></list></block></subclause></clause></part><part id="ch.5-pt.4" guid="_cb4067f4-f7e0-4d34-976d-627d2c847cf1" status="uncommenced" affected.by.uncommenced="0"><no>Part 4</no><heading id="ch.5-pt.4-he" guid="_73954563-661e-4c39-8acc-bec96f72c00c">Offence proceedings in Magistrates Court</heading><clause id="sec.174" guid="_b7f80a66-bf44-40ca-9c45-130af7cd7a1a" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>174</no><heading id="sec.174-he" guid="_031f86c0-f1fa-4633-b3cb-ed3e22a6fdca">Proceedings for offences</heading><subclause id="sec.174-ssec.1" guid="_6a2f0c14-1888-43a9-83a8-4e3e9134fea6" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">Proceedings (<defterm id="sec.174-def.offenceproceedings" guid="_efb53fac-cebe-4e6d-bb1c-7242e8ef700b" type="definition">offence proceedings</defterm>) for an offence against this Act—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.174-ssec.1-para1.a" guid="_68c38d9a-a93f-4e2b-9325-e3bcb788d4e2" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">are to be taken in a summary way; and</txt></block></li><li id="sec.174-ssec.1-para1.b" guid="_dd1b4f99-c13d-47fe-8adc-3ca78143a051" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">must start—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.174-ssec.1-para1.b-para2.i" guid="_28c1c3b9-405b-472c-b4a3-1dbffb9f5c65" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">within 1 year after the offence is committed; or</txt></block></li><li id="sec.174-ssec.1-para1.b-para2.ii" guid="_fbf15b8c-748f-45be-92f2-0955a401bf86" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">within 1 year after the offence comes to the complainant’s knowledge.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.174-ssec.2" guid="_b756f0ce-040d-4dd7-983e-2ee70f7d7d40" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, only the enforcement authority may bring a proceeding for an offence under—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.174-ssec.2-para1.a" guid="_ce743e89-ad35-416c-a9f3-ae0267db9c83" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if the offence is about the building assessment provisions—sections 163 or 164; or</txt></block></li><li id="sec.174-ssec.2-para1.b" guid="_a62f441e-1870-467b-aae3-cd15a75c17e6" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">otherwise—sections 168, 172 or 226.</txt></block></li></list></block></subclause><subclause id="sec.174-ssec.3" guid="_b77c0949-8e2b-4e49-8534-64cd7db94f65" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">In a complaint starting offence proceedings, a statement that the matter of the complaint came to the complainant’s knowledge on a stated day is evidence of the matter.</txt></block></subclause></clause><clause id="sec.175" guid="_135fca7e-d17a-4201-b39f-3db9d4e657b8" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>175</no><heading id="sec.175-he" guid="_cd982e71-69d1-4f31-bf7a-d5e93c6c6e8f">Proceedings brought in a representative capacity</heading><subclause id="sec.175-ssec.1" guid="_98fe3fde-1b77-44f5-893c-f9f595343f73" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A person may bring offence proceedings in a representative capacity, if the person has the consent of—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.175-ssec.1-para1.a" guid="_44eeaa8a-82b1-4f0b-b02f-4f9504b739dd" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for proceedings brought on behalf of a body of persons or a corporation—the members of its controlling or governing body; or</txt></block></li><li id="sec.175-ssec.1-para1.b" guid="_22924725-5f69-462b-a164-7a7b92d2f64c" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for proceedings brought on behalf of an individual—the individual.</txt></block></li></list></block><note id="sec.175-ssec.1-note" guid="_b28b637a-121f-43f1-af41-f30ecae34aef" type="example"><heading id="sec.175-ssec.1-note-he" guid="_cfe96dbc-a992-4f4a-9faa-400b784171e3">Note—</heading><block status="uncommenced"><txt break.before="1">For proceedings by a local government, see the <legref jurisd="QLD" type="act" check="unknown">Local Government Act</legref>, section 237 or the <legref jurisd="QLD" type="act" check="unknown">City of Brisbane Act</legref>, section 218.</txt></block></note></subclause><subclause id="sec.175-ssec.2" guid="_9ad45c9b-c5c3-44be-8551-217798b2cebb" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The person on whose behalf the offence proceedings are brought may contribute to, or pay, the legal costs and expenses incurred by the person bringing the proceedings.</txt></block></subclause></clause><clause id="sec.176" guid="_e0ba9fe1-0c96-471a-b6df-79291d933845" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>176</no><heading id="sec.176-he" guid="_6e2eadf1-f6cc-425d-a1d5-fd26dcb96206">Enforcement orders</heading><subclause id="sec.176-ssec.1" guid="_95a5997a-5670-4ea8-9347-30baba307e7d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">After hearing offence proceedings, a Magistrates Court may make an order (an <defterm id="sec.176-def.enforcementorder" guid="_b4678617-1569-44f4-a4ea-27c7334f4a9b" type="definition">enforcement order</defterm>) for the defendant to take stated action within a stated period.</txt></block><note id="sec.176-ssec.1-note" guid="_6aaf1d58-3651-41c5-93a4-ffb4d207f32f" type="example"><heading id="sec.176-ssec.1-note-he" guid="_ae8be01a-3335-4bcc-a313-99ef9a64e7a6">Examples of action that an order may require—</heading><block status="uncommenced"><list number.type="bull" unnumbered.indent="0"><li id="sec.176-ssec.1-note-para1" guid="_2bc2e771-bef3-462d-948d-491039c3239e" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">to stop carrying out development</txt></block></li><li id="sec.176-ssec.1-note-para1-oc.2" guid="_f0eccc73-38b0-45b3-8060-d14b9d674334" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">to demolish or remove development</txt></block></li><li id="sec.176-ssec.1-note-para1-oc.3" guid="_a3832000-c9c1-48ad-bbdf-6ab9b74fb4ea" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">to restore, as far as practicable, premises to the condition the premises were in immediately before development was started</txt></block></li><li id="sec.176-ssec.1-note-para1-oc.4" guid="_a8ddcc6a-c433-414c-acff-7180ea0249c2" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">to do, or not to do, another act to ensure development complies with a development permit</txt></block></li><li id="sec.176-ssec.1-note-para1-oc.5" guid="_e8a28b02-267b-4923-afab-dec1151fced0" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">if the court reasonably believes works are dangerous, to repair or rectify the works, to secure the works, or to fence the works off to protect people</txt></block></li><li id="sec.176-ssec.1-note-para1-oc.6" guid="_ea42afd7-9676-476d-a9e9-676d53287796" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">to stop a stated use of premises</txt></block></li><li id="sec.176-ssec.1-note-para1-oc.7" guid="_f02e5069-e15c-42c7-8519-b07dc093355a" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">to apply for a development permit</txt></block></li></list></block></note></subclause><subclause id="sec.176-ssec.2" guid="_d485b2ae-a85a-4b9c-8a3d-f4691b9f6583" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The enforcement order may be in terms the court considers appropriate to secure compliance with this Act.</txt><note id="sec.176-ssec.2-note" guid="_a8f28ef3-d085-4b05-a80d-f8a62ebf2f36" type="example"><heading id="sec.176-ssec.2-note-he" guid="_f53afd80-6283-4623-9218-4017e2c59d14">Example—</heading><block status="uncommenced"><txt break.before="1">The order may require the defendant to provide security for the reasonable cost of taking the stated action.</txt></block></note></block></subclause><subclause id="sec.176-ssec.3" guid="_f9f29fc1-b5fa-4796-9e94-e51e83cc667d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">An enforcement order must state the period within which the defendant must comply with the order.</txt></block></subclause><subclause id="sec.176-ssec.4" guid="_cd692c5a-e70c-4b19-a756-597a0c698e69" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">An enforcement order may be made under this section in addition to the imposition of a penalty or any other order under this Act.</txt></block></subclause><subclause id="sec.176-ssec.5" guid="_5df9fdd0-4282-48fe-ade9-dbba360f21d3" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">A person must not contravene an enforcement order.</txt></block><penalty id="sec.176-ssec.5-pen" guid="_53424fa7-4ad6-4149-9f28-f565db77ea4b"><block status="uncommenced"><txt break.before="1">Maximum penalty—4500 penalty units or 2 years imprisonment.</txt></block></penalty></subclause><subclause id="sec.176-ssec.6" guid="_0b2f194f-a971-47f7-8838-fe1d33ce82f8" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">Unless a court orders otherwise, an enforcement order, other than an order to apply for a development permit—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.176-ssec.6-para1.a" guid="_937e54dd-c924-4210-8f2a-ff85969c8ed4" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">attaches to the premises; and�</txt></block></li><li id="sec.176-ssec.6-para1.b" guid="_5de35c25-cf53-4b65-9e16-d5c9e4e66185" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">binds the owner, the owner’s successors in title and any occupier of the premises.</txt></block></li></list></block></subclause><subclause id="sec.176-ssec.7" guid="_db74afee-b765-432c-ad5a-a4058c206675" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">If the enforcement order does attach to the premises, the defendant must ask the registrar of titles, by notice given within 10 business days after the order is made, to record the making of the order on the register for the premises.</txt></block><penalty id="sec.176-ssec.7-pen" guid="_d16cfe35-22c5-40e2-8167-3a3801bf436a"><block status="uncommenced"><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause id="sec.176-ssec.8" guid="_b2e11aba-8ef9-4101-afc7-d9855c0c43b7" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(8)</no><block status="uncommenced"><txt break.before="1">A person may apply to the court for an order (a <defterm id="sec.176-def.complianceorder" guid="_325ab666-4483-447b-96f3-035a79f7fb17" type="definition">compliance order</defterm>) that states the enforcement order has been complied with.</txt></block></subclause><subclause id="sec.176-ssec.9" guid="_180abb78-0dd7-4af1-956d-b6840e417dbf" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(9)</no><block status="uncommenced"><txt break.before="1">If a person gives a notice that a compliance order has been made, and a copy of the compliance order, to the registrar of titles, the registrar must remove the record of the making of the enforcement order from the appropriate register.</txt></block></subclause><subclause id="sec.176-ssec.10" guid="_83330ad4-1194-4c13-8eb5-4761ca0f8415" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(10)</no><block status="uncommenced"><txt break.before="1">If the enforcement order is not complied with within the period stated in the order, the enforcement authority may—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.176-ssec.10-para1.a" guid="_613ada97-29b1-4443-b57e-91e1b515db17" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">take the action required under the order; and</txt></block></li><li id="sec.176-ssec.10-para1.b" guid="_4754793b-7651-44ee-ae87-e68ca9603384" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">recover the reasonable cost of taking the action as a debt owing to the authority from the defendant.</txt></block></li></list></block></subclause><subclause id="sec.176-ssec.11" guid="_345bcc71-5dec-4eb1-b516-b7c4d1895c0f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(11)</no><block status="uncommenced"><txt break.before="1">A notice given to the registrar of titles under this section must be in the form, and accompanied by the fee, required under the <legref jurisd="QLD" type="act" check="unknown">Land Title Act</legref>.</txt></block></subclause></clause><clause id="sec.177" guid="_0b85244a-9d48-4d23-82f8-a5ef6dcd1d73" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>177</no><heading id="sec.177-he" guid="_065c88f9-5991-4b31-ad7f-4f8aacbe0c4a">Order for compensation</heading><subclause id="sec.177-ssec.1" guid="_ba6b3634-0674-4aaf-90bb-bf3714df281a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if a Magistrates Court—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.177-ssec.1-para1.a" guid="_369a830f-cf14-43ef-afd8-384aef7cd78a" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">finds a defendant guilty of an offence under this Act; and</txt></block></li><li id="sec.177-ssec.1-para1.b" guid="_4ecd0835-3f1f-4e98-8b7f-369d8e1e4b50" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">finds that, because of the offence, another person has—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.177-ssec.1-para1.b-para2.i" guid="_f10cb94d-7310-4f5c-94a4-db875270c369" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">suffered loss of income; or</txt></block></li><li id="sec.177-ssec.1-para1.b-para2.ii" guid="_d5f08540-b7c6-4ef5-8f03-2d2780a4c85c" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">suffered a reduction in the value of, or damage to, property; or</txt></block></li><li id="sec.177-ssec.1-para1.b-para2.iii" guid="_960442d9-b07a-4a7a-a6f1-68ce314df19f" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">incurred expenses to replace or repair property or prevent or minimise, or attempt to prevent or minimise, the loss, reduction or damage.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.177-ssec.2" guid="_9e78b5a3-58b2-49fd-b335-53fcee0a3229" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The court may order the defendant to pay the other person compensation for the loss, reduction or damage suffered or the expenses incurred.</txt></block></subclause><subclause id="sec.177-ssec.3" guid="_beb2e00f-5718-4a7d-a8e7-d9ad2e4c7d52" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">An order may be made under this section in addition to the imposition of a penalty and any other order under this Act.</txt></block></subclause></clause><clause id="sec.178" guid="_1b64b1d6-e6da-4491-ac50-1b3b043bfff0" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>178</no><heading id="sec.178-he" guid="_c4a81976-051c-4a68-95bf-f4a7b7d7d536">Order for investigation expenses</heading><subclause id="sec.178-ssec.1" guid="_e28616c0-4813-4d8f-9942-76766ed43ed5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.178-ssec.1-para1.a" guid="_b726513c-3342-4912-bdb8-bce2e67f683c" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a Magistrates Court finds—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.178-ssec.1-para1.a-para2.i" guid="_a1598c0b-04bb-4abc-a17a-cf22c8087d28" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a defendant guilty of a development offence; and</txt></block></li><li id="sec.178-ssec.1-para1.a-para2.ii" guid="_5193f0e4-a826-4b4f-bf7c-a4a97ff8d6ed" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">an enforcement authority has reasonably incurred expenses in taking a sample or conducting an inspection, test, measurement or analysis to investigate the offence; and</txt></block></li></list></block></li><li id="sec.178-ssec.1-para1.b" guid="_1bfda848-6ea8-41e6-b78e-23f65631686b" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the enforcement authority applies for an order for the payment of the expenses.</txt></block></li></list></block></subclause><subclause id="sec.178-ssec.2" guid="_1ffe2517-9048-4381-b63d-25d2baed5746" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The court may order the defendant to pay a reasonable amount for the expenses to the enforcement authority if the court considers it would be just to do so in the circumstances.</txt></block></subclause></clause><clause id="sec.179" guid="_479f3c52-4332-4964-9856-5b24c30c2f60" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>179</no><heading id="sec.179-he" guid="_011a6aab-eed6-4bd3-bd50-cf9b3ceea2f4">When fine is payable to local government</heading><block status="uncommenced"><txt break.before="1">If a local government is—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.179-para1.a" guid="_6ae29ae5-7686-493f-809c-c9c47b5e47f3" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the complainant in offence proceedings; and</txt></block></li><li id="sec.179-para1.b" guid="_ada0be7e-fec9-4bda-b772-ce13ae28bfb5" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the enforcement authority for the matter that is the subject of the proceedings;</txt></block></li></list></block><block status="uncommenced"><txt break.before="1">any fine ordered in the proceedings must be paid to the local government.</txt></block></clause></part><part id="ch.5-pt.5" guid="_57f83f5b-542f-4886-bb2e-405fcaddc1e4" status="uncommenced" affected.by.uncommenced="0"><no>Part 5</no><heading id="ch.5-pt.5-he" guid="_d198fd21-0410-4437-879c-5797834ee019">Enforcement orders in P&#38;E Court</heading><clause id="sec.180" guid="_f0e2cce9-88f0-441e-abbf-58056b5b5bad" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>180</no><heading id="sec.180-he" guid="_417546a5-adbf-4893-9a43-000198c9b8ac">Enforcement orders</heading><subclause id="sec.180-ssec.1" guid="_7adbf6b6-8f5c-435b-be03-36495a6ecd68" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">Any person may start proceedings in the P&#38;E Court for an enforcement order.</txt></block></subclause><subclause id="sec.180-ssec.2" guid="_2616289d-96a7-4762-8084-d4c8c7b0038b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">An <defterm id="sec.180-def.enforcementorder" guid="_f469c19a-f483-404e-80dc-5419ae4a4280" type="definition">enforcement order</defterm> is an order that requires a person to do either or both of the following—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.180-ssec.2-para1.a" guid="_47aeb222-c29a-42fa-8589-1b004c032fc7" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">refrain from committing a development offence;</txt></block></li><li id="sec.180-ssec.2-para1.b" guid="_15d690d7-f329-4c41-a2ec-58779684e956" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">remedy the effect of a development offence in a stated way.</txt></block></li></list><note id="sec.180-ssec.2-note" guid="_dd58eb0e-e62c-43cd-a200-cad9640d9683" type="example"><heading id="sec.180-ssec.2-note-he" guid="_16c99812-2bf6-4488-bcee-c6a89df73952">Example—</heading><block status="uncommenced"><txt break.before="1">An enforcement order may require a person to pay compensation to someone who, because of the offence, has—</txt><list number.type="alpha-lc" unnumbered.indent="0"><li id="sec.180-ssec.2-note-para1.a" guid="_cad4383f-47b0-4234-9aca-a7733a5449ba" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">suffered loss of income; or</txt></block></li><li id="sec.180-ssec.2-note-para1.b" guid="_bc6df2c5-6810-45cb-ac5b-762961978de9" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">suffered a reduction in the value of, or damage to, property; or</txt></block></li><li id="sec.180-ssec.2-note-para1.c" guid="_bb9bfd06-6ffd-486f-9bcb-9f65f50e87a5" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">incurred expenses to replace or repair property or prevent or minimise, or attempt to prevent or minimise, the loss, reduction or damage.</txt></block></li></list></block></note></block></subclause><subclause id="sec.180-ssec.3" guid="_2d0b5173-157f-4501-a57b-70f7044b60d2" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The P&#38;E Court may make an enforcement order if the court considers the development offence—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.180-ssec.3-para1.a" guid="_c6b14f6f-a36d-42fd-afe9-651109995932" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">has been committed; or</txt></block></li><li id="sec.180-ssec.3-para1.b" guid="_1aee48af-df90-41ca-a525-40a15ea2f60d" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">will be committed unless the order is made.</txt></block></li></list></block></subclause><subclause id="sec.180-ssec.4" guid="_9989c54c-767f-4b36-bea1-7a10aba55511" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The P&#38;E Court may make an enforcement order (an <defterm id="sec.180-def.interimenforcementorder" guid="_5afb0e53-c2e4-4c71-9376-008f0d7d2972" type="definition">interim enforcement order</defterm>) pending a decision in proceedings for the enforcement order.</txt></block></subclause><subclause id="sec.180-ssec.5" guid="_6c9388dc-5309-4e6f-b3c1-c2edd96e42aa" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">An enforcement order or interim enforcement order may direct the respondent—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.180-ssec.5-para1.a" guid="_33664a37-073f-4557-b2ff-c165a649b054" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">to stop an activity that constitutes a development offence; or</txt></block></li><li id="sec.180-ssec.5-para1.b" guid="_c4f86158-94a4-4db8-95c8-e765a67277e1" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">not to start an activity that constitutes a development offence; or</txt></block></li><li id="sec.180-ssec.5-para1.c" guid="_98715484-adc1-4bd9-9623-f07f1ecca2f9" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">to do anything required to stop committing a development offence; or</txt></block></li><li id="sec.180-ssec.5-para1.d" guid="_40a42825-5ed9-44fa-aff9-089e2068e3c6" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">to return anything to a condition as close as practicable to the condition the thing was in immediately before a development offence was committed; or</txt></block></li><li id="sec.180-ssec.5-para1.e" guid="_8a971f9b-4913-4966-b962-bbeae4f8c268" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">to do anything to comply with this Act.</txt></block></li></list></block><note id="sec.180-ssec.5-note" guid="_edc3852d-070b-4444-b4d1-ebd0cf4fa44f" type="example"><heading id="sec.180-ssec.5-note-he" guid="_46fad81c-ee58-4cc6-9484-087b5051557c">Examples of what the respondent may be directed to do—</heading><block status="uncommenced"><list number.type="bull" unnumbered.indent="0"><li id="sec.180-ssec.5-note-para1" guid="_a92b9003-a7aa-4247-b9a8-75a25a0188ea" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">to repair, demolish or remove a building</txt></block></li><li id="sec.180-ssec.5-note-para1-oc.2" guid="_e22150c6-aab7-4137-b07a-c006ac4012f4" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">to rehabilitate or restore vegetation cleared from land</txt></block></li></list></block></note></subclause><subclause id="sec.180-ssec.6" guid="_1bbed1ef-5c8e-4bf2-af06-03162cb092b7" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">An enforcement order or interim enforcement order may be in terms the P&#38;E Court considers appropriate to secure compliance with this Act.</txt></block><note id="sec.180-ssec.6-note" guid="_f80f11c5-f796-4d3d-b7c8-b18644feeba5" type="example"><heading id="sec.180-ssec.6-note-he" guid="_234a9d60-ecf3-4532-b929-f366bc767a80">Example—</heading><block status="uncommenced"><txt break.before="1">An enforcement order may require the respondent to provide security for the reasonable cost of taking the stated action.</txt></block></note></subclause><subclause id="sec.180-ssec.7" guid="_058c16d7-4c41-4394-97cc-7af2aef1654d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">An enforcement order or interim enforcement order must state the period within which the respondent must comply with the order.</txt></block></subclause><subclause id="sec.180-ssec.8" guid="_5a229286-ed92-413c-bddc-fc54154d6b83" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(8)</no><block status="uncommenced"><txt break.before="1">A person must not contravene an enforcement order or interim enforcement order.</txt></block><penalty id="sec.180-ssec.8-pen" guid="_b73eca6a-df5a-4de4-a4f7-746ac8a77ad7"><block status="uncommenced"><txt break.before="1">Maximum penalty—4500 penalty units or 2 years imprisonment.</txt></block></penalty></subclause><subclause id="sec.180-ssec.9" guid="_4fe5a8ef-d2c8-4c75-962a-8a34e2378b64" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(9)</no><block status="uncommenced"><txt break.before="1">Unless the P&#38;E Court orders otherwise, an enforcement order, or interim enforcement order, other than an order to apply for a development permit—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.180-ssec.9-para1.a" guid="_5fe15122-656e-4824-86d1-02011a82aba3" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">attaches to the premises; and�</txt></block></li><li id="sec.180-ssec.9-para1.b" guid="_e4683ea4-1a56-4f48-a963-f42326aa4a81" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">binds the owner, the owner’s successors in title and any occupier of the premises.</txt></block></li></list></block></subclause><subclause id="sec.180-ssec.10" guid="_bda6d3b8-5cab-4d68-a5a0-39b398319aa3" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(10)</no><block status="uncommenced"><txt break.before="1">If the enforcement order, or interim enforcement order, does attach to the premises, the respondent must ask the registrar of titles, by a notice given within 10 business days after the order is made, to record the making of the order on the appropriate register for the premises.</txt></block><penalty id="sec.180-ssec.10-pen" guid="_653d2026-f15c-4ad1-9b1b-71f221bc1eea"><block status="uncommenced"><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause id="sec.180-ssec.11" guid="_2e4fa995-a72a-4890-a57a-d47d4f5ab074" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(11)</no><block status="uncommenced"><txt break.before="1">A person may apply to the P&#38;E Court for an order (a <defterm id="sec.180-def.complianceorder" guid="_72f21ba6-1619-48d3-a6a5-389f36b03950" type="definition">compliance order</defterm>) that states the enforcement order, or interim enforcement order, has been complied with.</txt></block></subclause><subclause id="sec.180-ssec.12" guid="_57f5e1a0-548d-4a99-89b1-f500cd6ba2f8" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(12)</no><block status="uncommenced"><txt break.before="1">If a person gives a notice that a compliance order has been made, and a copy of the compliance order, to the registrar of titles, the registrar must remove the record of the making of the enforcement order, or interim enforcement order, from the appropriate register.</txt></block></subclause><subclause id="sec.180-ssec.13" guid="_cfec9349-ed55-4f9d-96f9-ba55a4e3b166" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(13)</no><block status="uncommenced"><txt break.before="1">If the enforcement order, or interim enforcement order, is not complied with within the period stated in the order, the enforcement authority may—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.180-ssec.13-para1.a" guid="_1bbf3eda-b484-4da8-8624-88bc1299b31b" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">take the action required under the order; and</txt></block></li><li id="sec.180-ssec.13-para1.b" guid="_8ef853da-8d12-495f-8d69-663d253c831e" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">recover the reasonable cost of taking the action as a debt owing to the authority from the respondent.</txt></block></li></list></block></subclause><subclause id="sec.180-ssec.14" guid="_c57f7783-b8af-4786-a78b-f18069482427" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(14)</no><block status="uncommenced"><txt break.before="1">A notice given to the registrar of titles under this section must be in the form, and accompanied by the fee, required under the <legref jurisd="QLD" type="act" check="unknown">Land Title Act</legref>.</txt></block></subclause></clause><clause id="sec.181" guid="_cc4e90f7-77b0-4cfd-9bb5-5b50c059dabe" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>181</no><heading id="sec.181-he" guid="_e3ccfc74-70e5-48ed-a49d-d840763c945f">P&#38;E Court’s powers about enforcement orders</heading><subclause id="sec.181-ssec.1" guid="_94955036-0f7c-4799-b7c7-55560b6429fb" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The P&#38;E Court’s power to make an enforcement order or interim enforcement order may be exercised whether or not the development offence has been prosecuted.</txt></block></subclause><subclause id="sec.181-ssec.2" guid="_aec551eb-74ef-4d55-b199-e3d30eecb8f5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The power to order a person to stop, or not to start, an activity may be exercised whether or not—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.181-ssec.2-para1.a" guid="_10709a8f-7960-4e56-af76-3b5762cfd87a" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the P&#38;E Court considers the person intends to engage, or to continue to engage, in the activity; or</txt></block></li><li id="sec.181-ssec.2-para1.b" guid="_c9fa10d2-2040-4111-9231-58926cba03cc" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the person has previously engaged in an activity of the same type; or</txt></block></li><li id="sec.181-ssec.2-para1.c" guid="_adc711c1-9c70-4bfe-9226-30ece3b808a9" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">there is danger of substantial damage to property or injury to another person if the person engages, or continues to engage, in the activity.</txt></block></li></list></block></subclause><subclause id="sec.181-ssec.3" guid="_157b24c5-c8e9-46d6-8033-e1e894992c96" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The power to order a person to do anything may be exercised whether or not—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.181-ssec.3-para1.a" guid="_8818704c-a947-4bc7-9298-029e91262592" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the P&#38;E Court considers the person intends to fail, or to continue to fail, to do the thing; or</txt></block></li><li id="sec.181-ssec.3-para1.b" guid="_df749e6f-323d-494a-b391-bee2ea7cf246" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the person has previously failed to do a thing of the same type; or</txt></block></li><li id="sec.181-ssec.3-para1.c" guid="_80447605-0235-47eb-a7a9-6b344bcab74b" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">there is danger of substantial damage to property or injury to another person if the person fails, or continues to fail, to do the thing.</txt></block></li></list></block></subclause><subclause id="sec.181-ssec.4" guid="_6dd835d2-da30-47a2-9783-0f3ad6ed6d3f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">A person may apply to the P&#38;E Court to cancel or change an enforcement order or interim enforcement order.</txt></block></subclause><subclause id="sec.181-ssec.5" guid="_ae2f5e89-9ab1-4fc5-a5da-482990d884c9" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The P&#38;E Court’s powers under this section are in addition to the court’s other powers.</txt></block></subclause></clause></part><part id="ch.5-pt.6" guid="_0ea6d136-0343-46d1-9c4f-4cf756141d5a" status="uncommenced" affected.by.uncommenced="0"><no>Part 6</no><heading id="ch.5-pt.6-he" guid="_42383bad-cb50-4246-8b90-2d1edc3090f2">Inspectors</heading><division id="ch.5-pt.6-div.1" guid="_3a2cddf4-253f-406a-ab24-02aae02049ff" status="uncommenced" affected.by.uncommenced="0"><no>Division 1</no><heading id="ch.5-pt.6-div.1-he" guid="_ffd405eb-a368-4a95-9b9e-43d54f0f4f99">Appointment</heading><clause id="sec.182" guid="_684f64cf-e7f7-4df2-a658-16470bd0d4be" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>182</no><heading id="sec.182-he" guid="_76e65366-d160-4d3e-822c-07b43df6331d">Appointment and qualifications</heading><subclause id="sec.182-ssec.1" guid="_b8f956c9-3482-404f-baa6-54d6710c01c0" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The chief executive may, by a written document, appoint the following persons as inspectors—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.182-ssec.1-para1.a" guid="_b33328a1-7bf3-413f-90ff-cf8bedb8c608" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">an officer of the department;</txt></block></li><li id="sec.182-ssec.1-para1.b" guid="_bd0313fc-2bc5-48f1-8235-2e33db71e2ce" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">another person prescribed by regulation.</txt></block></li></list></block></subclause><subclause id="sec.182-ssec.2" guid="_c55df073-9502-414a-9684-a9bd1880df7a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, the chief executive may appoint a person as an inspector only if the chief executive is satisfied the person is qualified for appointment because the person has the necessary expertise or experience.</txt></block></subclause><subclause id="sec.182-ssec.3" guid="_1e769147-65bb-42df-a08c-63d5fa2cdd5b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">An inspector holds office on any conditions, and subject to any limit on the inspector’s powers, stated in—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.182-ssec.3-para1.a" guid="_52347457-004b-48f6-bb25-79b283c5cd49" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the inspector’s instrument of appointment; or</txt></block></li><li id="sec.182-ssec.3-para1.b" guid="_4f128c9a-e0e3-47e2-ae45-f2301548102c" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a notice signed by the chief executive and given to the inspector; or</txt></block></li><li id="sec.182-ssec.3-para1.c" guid="_9c95cad6-bd84-408f-81d0-a8f054b28bcd" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">a regulation.</txt></block></li></list></block></subclause></clause><clause id="sec.183" guid="_729ee6b4-4465-4d6e-8df0-4c7af01dccd1" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>183</no><heading id="sec.183-he" guid="_bcae6016-516b-414c-b763-042af9045523">When appointment ends</heading><subclause id="sec.183-ssec.1" guid="_831b285a-a684-47e3-b3c0-739b971cd069" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The appointment of a person as an inspector ends if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.183-ssec.1-para1.a" guid="_27d3753f-ac2e-430b-b4f8-c2ef1b2ca894" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the term of office stated in a condition of office ends; or</txt></block></li><li id="sec.183-ssec.1-para1.b" guid="_d895d25f-30aa-4447-94d3-e7633f3f5a33" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">under another condition of office, the office ends; or</txt></block></li><li id="sec.183-ssec.1-para1.c" guid="_51fdb36f-929f-430e-b6e0-b3d4f136d098" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the inspector resigns, by a notice signed by the inspector and given to the chief executive.</txt></block></li></list></block></subclause><subclause id="sec.183-ssec.2" guid="_665abb57-2dff-4af4-b2f6-80a1705aa4da" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, this section does not limit the ways the office of a person as an inspector ends.</txt></block></subclause><subclause id="sec.183-ssec.3" guid="_f449f331-a462-4061-85c6-e5c5e289f900" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.183-ssec.3-def.conditionofoffice_" guid="_1e59982f-e25d-478d-ab93-e450e6efaf20" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.183-ssec.3-def.conditionofoffice" guid="_371959f5-8637-410c-8dbf-48b0d6c7d97a" type="definition">condition of office</defterm> means a condition under which the inspector holds office.</txt></definition></deflist></block></subclause></clause></division><division id="ch.5-pt.6-div.2" guid="_fe3885e0-bebe-4a86-b393-4e267a32a957" status="uncommenced" affected.by.uncommenced="0"><no>Division 2</no><heading id="ch.5-pt.6-div.2-he" guid="_20eba73c-f2f9-4182-829f-840f0b9cf5ec">Identity cards</heading><clause id="sec.184" guid="_24402af1-15e3-43cd-9cac-887ad1031bbe" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>184</no><heading id="sec.184-he" guid="_6f0107a6-39ed-4bae-94b8-e8390ba17e80">Issuing and returning identity card</heading><subclause id="sec.184-ssec.1" guid="_79014eb4-6345-4a92-a692-d56123088a8f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The chief executive must issue an identity card to each inspector.</txt></block></subclause><subclause id="sec.184-ssec.2" guid="_61ead02b-878c-4a93-8d2a-d2be00c6c02a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The identity card must—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.184-ssec.2-para1.a" guid="_dbc995c7-69d7-42bc-ae36-e5d230b61c13" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">contain a recent photo of the inspector; and</txt></block></li><li id="sec.184-ssec.2-para1.b" guid="_fdcec5d7-78c7-4cf2-97d2-f72c8ff5a346" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">contain a copy of the inspector’s signature; and</txt></block></li><li id="sec.184-ssec.2-para1.c" guid="_d73593a8-87d1-4c84-af85-9b17176cf9ca" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">identify the person as an inspector under this Act; and</txt></block></li><li id="sec.184-ssec.2-para1.d" guid="_4f28567c-5f58-4a0a-bbf9-af97c3dd12fd" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">state an expiry date for the card.</txt></block></li></list></block></subclause><subclause id="sec.184-ssec.3" guid="_f682f3ac-98e1-4bd0-926c-ccbc04ec39a0" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">This section does not prevent the issue of a single identity card to a person for this Act and for other purposes.</txt></block></subclause><subclause id="sec.184-ssec.4" guid="_77317247-d766-4074-ad28-4e1d04d7f6a7" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">If the office of a person as an inspector ends, the person must return the person’s identity card to the chief executive within 21 days after the office ends, unless the person has a reasonable excuse.</txt><penalty id="sec.184-ssec.4-pen" guid="_c716288d-7af3-4b05-b052-c0ad19d53292"><block status="uncommenced"><txt break.before="1">Maximum penalty—10 penalty units.</txt></block></penalty></block></subclause></clause><clause id="sec.185" guid="_4f4b7892-9d27-4868-909a-63ec5a748e48" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>185</no><heading id="sec.185-he" guid="_d2785db0-1352-413b-9bfc-aa6a4211cd60">Producing or displaying identity card</heading><subclause id="sec.185-ssec.1" guid="_c1a58157-858f-4e7d-a229-b269c873e215" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">When exercising a power in relation to a person in the person’s presence, an inspector must—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.185-ssec.1-para1.a" guid="_2910f454-8180-4c52-985d-f397f3206ad3" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">produce the inspector’s identity card for the person’s inspection before exercising the power; or</txt></block></li><li id="sec.185-ssec.1-para1.b" guid="_fda6fd0b-fb9e-42df-ac13-3b82cf2d64d9" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">have the identity card displayed so the identity card is clearly visible to the person when exercising the power.</txt></block></li></list></block></subclause><subclause id="sec.185-ssec.2" guid="_4cee28bd-1026-4006-ad01-98ef83d5a8fd" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, if it is not practicable to comply with subsection (1), the inspector must produce the identity card for the person’s inspection at the first reasonable opportunity.</txt></block></subclause><subclause id="sec.185-ssec.3" guid="_cd680bdb-49d4-4e6a-b91c-a0db6674f504" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">For subsection (1), an inspector does not exercise a power in relation to a person only because the inspector has entered a place under section 186(1)(b).</txt></block></subclause></clause></division></part><part id="ch.5-pt.7" guid="_d2d67db2-fc57-4892-9dd1-a97d73352ac4" status="uncommenced" affected.by.uncommenced="0"><no>Part 7</no><heading id="ch.5-pt.7-he" guid="_3347feee-6241-4937-b580-30b2a9d83423">Entry of places by inspectors</heading><division id="ch.5-pt.7-div.1" guid="_b9d82f20-e3ad-4251-b567-49caa9955b11" status="uncommenced" affected.by.uncommenced="0"><no>Division 1</no><heading id="ch.5-pt.7-div.1-he" guid="_c5deb5ab-6974-4969-811e-3597e4d3e0ca">Power to enter</heading><clause id="sec.186" guid="_cf911b22-c207-4830-8b8c-88b466508959" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>186</no><heading id="sec.186-he" guid="_72e6ef92-4f30-4299-b225-93dbcb439d04">General power to enter places</heading><subclause id="sec.186-ssec.1" guid="_c61e1d60-5895-4ee7-890b-68d23ca20d3f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">An inspector may enter a place if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.186-ssec.1-para1.a" guid="_18ef05a9-de79-4ebc-94a5-82d1d7d980f3" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">an occupier at the place consents under division 2 to the entry and section 189 has been complied with for the occupier; or</txt></block></li><li id="sec.186-ssec.1-para1.b" guid="_9a4fb1f5-5489-4cfb-bfdf-0af220ba6b34" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the place is a public place and the entry is made when the place is open to the public; or</txt></block></li><li id="sec.186-ssec.1-para1.c" guid="_314f7609-bc04-4790-b24b-13675c1be7e3" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">a warrant authorises the entry and, if there is an occupier of the place, the inspector has complied with section 196; or</txt></block></li><li id="sec.186-ssec.1-para1.d" guid="_7a2b1c6c-1683-4513-a35f-a6844eee1c33" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">the place is mentioned in a development approval as a place of business and is—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.186-ssec.1-para1.d-para2.i" guid="_49b88817-03f5-4d7e-949c-f4e0f67074ac" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">open for carrying on the business; or</txt></block></li><li id="sec.186-ssec.1-para1.d-para2.ii" guid="_72568041-3962-4549-911c-0e56a989bd59" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">otherwise open for entry; or</txt></block></li><li id="sec.186-ssec.1-para1.d-para2.iii" guid="_c335bb54-7dfd-4185-815f-2a2cfedb7755" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">required to be open for inspection under the development approval.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.186-ssec.2" guid="_2c5af41e-57db-45e9-9058-1fe4a58e25ab" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">If the power to enter arises only because an occupier of the place consents to the entry, the power is subject to any conditions of the consent and stops if the consent is withdrawn.</txt></block></subclause><subclause id="sec.186-ssec.3" guid="_4e87a4a3-7eb5-4585-b30d-0abc787845a0" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The consent may provide consent for re-entry and is subject to the conditions of consent.</txt></block></subclause><subclause id="sec.186-ssec.4" guid="_71add759-2379-4b92-a94c-00c7ef789d1b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">If the power to enter is under a warrant, the power is subject to the terms of the warrant.</txt></block></subclause><subclause id="sec.186-ssec.5" guid="_1648d55b-f2d3-4aa8-98b0-8b6865bcef4f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">If the power to re-enter is under a warrant, the re-entry is subject to the terms of the warrant.</txt></block></subclause></clause></division><division id="ch.5-pt.7-div.2" guid="_6ecf70da-65f9-4df1-aed4-7c363974a1e9" status="uncommenced" affected.by.uncommenced="0"><no>Division 2</no><heading id="ch.5-pt.7-div.2-he" guid="_862f6d27-9595-4234-b013-86b8d0fcb4a3">Entry with consent</heading><clause id="sec.187" guid="_5068bd4c-c1bf-44b4-870a-e6582c0b8e9e" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>187</no><heading id="sec.187-he" guid="_f8ff9173-fa45-4413-a7f6-6f20d4bdf404">Application of this division</heading><block status="uncommenced"><txt break.before="1">This division applies if an inspector intends to ask an occupier of a place to consent to the inspector or another inspector entering the place.</txt></block></clause><clause id="sec.188" guid="_6a768be3-fac5-4716-8ff3-21050ab18177" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>188</no><heading id="sec.188-he" guid="_0186f4a9-d7ce-48d3-94ac-440db6662384">Incidental entry to ask for access</heading><block status="uncommenced"><txt break.before="1">In order to ask the occupier for consent to enter a place, an inspector may, without the occupier’s consent or a warrant, enter a part of the place that the inspector reasonably considers the public may enter if wanting to speak to the occupier.</txt></block></clause><clause id="sec.189" guid="_c61d89bb-086a-4b1c-94d8-0cda16a17654" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>189</no><heading id="sec.189-he" guid="_a8dd32f4-f185-4bb1-8f9f-5606cb982f1a">Matters inspector must tell occupier</heading><block status="uncommenced"><txt break.before="1">The inspector must give a reasonable explanation of the following matters to the occupier before asking for the consent—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.189-para1.a" guid="_3abc1bbb-b444-44fe-83ec-7b79f65472be" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the purpose of the entry, including the powers intended to be exercised;</txt></block></li><li id="sec.189-para1.b" guid="_87b62c68-b3a8-4d72-b7a7-29e82702c655" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">that the occupier is not required to consent;</txt></block></li><li id="sec.189-para1.c" guid="_25a2f4cf-96cf-4be3-a978-3c1921f90e36" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">that the consent may be given subject to conditions and may be withdrawn at any time.</txt></block></li></list></block></clause><clause id="sec.190" guid="_914c5185-8aba-466e-8829-dda2fd1b468c" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>190</no><heading id="sec.190-he" guid="_10fa007e-49c9-4e61-a0fc-fff2a184f9fd">Consent acknowledgement</heading><subclause id="sec.190-ssec.1" guid="_171f8679-48cf-4a19-b17f-cef5ae039e03" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">If the occupier gives the consent, the inspector may ask the occupier to sign an acknowledgement of the consent.</txt></block></subclause><subclause id="sec.190-ssec.2" guid="_7a50152b-bd5b-4370-b9a8-3e7e9b1f7e8a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The acknowledgement must state—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.190-ssec.2-para1.a" guid="_164240bf-13d8-42b9-a315-a78aee7082c8" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the purpose of the entry, including the powers to be exercised; and</txt></block></li><li id="sec.190-ssec.2-para1.b" guid="_c962eae4-c899-4a10-9bb0-8b385e509a9b" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the following has been explained to the occupier—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.190-ssec.2-para1.b-para2.i" guid="_3ca4f254-2fe6-4641-b261-f6c24394a2f0" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the purpose of the entry, including the powers intended to be exercised;</txt></block></li><li id="sec.190-ssec.2-para1.b-para2.ii" guid="_1da082bb-8667-4ba1-93b4-e66069c2c479" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">that the occupier is not required to consent;</txt></block></li><li id="sec.190-ssec.2-para1.b-para2.iii" guid="_22ac736c-f7fd-4116-8a52-8112e9753dcf" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">that the consent may be given subject to conditions and may be withdrawn at any time; and</txt></block></li></list></block></li><li id="sec.190-ssec.2-para1.c" guid="_dfe206cc-b65e-400e-8428-0a1c91a8003d" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the occupier gives the inspector or another inspector consent to enter the place and exercise the powers; and</txt></block></li><li id="sec.190-ssec.2-para1.d" guid="_ee3b5e61-926c-4d9b-bf63-3bcf27603e1c" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">any conditions of the consent; and</txt></block></li><li id="sec.190-ssec.2-para1.e" guid="_dbc75654-05ce-48df-ad0c-762cb264775a" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">the time and day the consent was given.</txt></block></li></list></block></subclause><subclause id="sec.190-ssec.3" guid="_18940b19-05d8-42cc-91e2-02cbcf8baadb" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">If the occupier signs the acknowledgement, the inspector must immediately give a copy of the acknowledgement to the occupier.</txt></block></subclause><subclause id="sec.190-ssec.4" guid="_c48e22df-802d-4d0e-b222-d5919f5064fc" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">If—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.190-ssec.4-para1.a" guid="_8785c086-bb88-4859-8e65-3f926c43dc92" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">an issue arises in a proceeding about whether the occupier consented to the entry; and</txt></block></li><li id="sec.190-ssec.4-para1.b" guid="_71fe3e9f-a315-427e-ae21-717d45145507" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a signed acknowledgement complying with subsection (2) for the entry is not produced in evidence;</txt></block></li></list></block><block status="uncommenced"><txt break.before="1">the onus of proof is on the person relying on the lawfulness of the entry to prove the occupier consented.</txt></block></subclause></clause></division><division id="ch.5-pt.7-div.3" guid="_dbb20117-020d-4b70-8339-5fe5e898c317" status="uncommenced" affected.by.uncommenced="0"><no>Division 3</no><heading id="ch.5-pt.7-div.3-he" guid="_bf474141-1cf4-4790-9808-b2cc6bddf8a6">Entry with warrant</heading><subdivision id="ch.5-pt.7-div.3-sdiv.1" guid="_b1231d9b-456f-49e4-89f5-21724b2b3198" status="uncommenced" affected.by.uncommenced="0"><no>Subdivision 1</no><heading id="ch.5-pt.7-div.3-sdiv.1-he" guid="_064393c5-e54d-4862-b714-600234a89e4f">Issue of warrant</heading><clause id="sec.191" guid="_d9d24c84-bfd5-4b03-80b8-faf1561bca0e" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>191</no><heading id="sec.191-he" guid="_d8e8f935-99af-4938-afa0-c6137a3c1b40">Application for warrant</heading><subclause id="sec.191-ssec.1" guid="_51551f56-5ac3-44e0-bdc9-67643d9219d2" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">An inspector may apply to a magistrate for a warrant for a place.</txt></block></subclause><subclause id="sec.191-ssec.2" guid="_30c0fdab-69aa-482b-96c2-53e55e669e78" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The inspector must prepare a written application that states the grounds on which the warrant is sought.</txt></block></subclause><subclause id="sec.191-ssec.3" guid="_1cdabfe0-1303-4048-b478-bfa76f0e8be2" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The written application must be sworn.</txt></block></subclause><subclause id="sec.191-ssec.4" guid="_8c756873-e695-4e1f-a985-8f785f8ef475" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The magistrate may refuse to consider the application until the inspector gives the magistrate all the information the magistrate requires about the application in the way the magistrate requires.</txt></block><note id="sec.191-ssec.4-note" guid="_ad087bbd-b15a-4191-8b66-30345aae1a9d" type="example"><heading id="sec.191-ssec.4-note-he" guid="_babb63f1-6a8e-4f5c-b970-6262a6d0abe8">Example—</heading><block status="uncommenced"><txt break.before="1">The magistrate may require extra information supporting the written application to be given by statutory declaration.</txt></block></note></subclause></clause><clause id="sec.192" guid="_20706ee6-d764-45ea-b340-2cd54a6b9588" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>192</no><heading id="sec.192-he" guid="_2cc1500c-2789-4b07-aca8-28b41cef7b73">Issue of warrant</heading><subclause id="sec.192-ssec.1" guid="_6161290b-1a43-4ffe-a0e4-383793166e14" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The magistrate may issue the warrant for the place only if satisfied there are reasonable grounds for suspecting that a particular thing or activity that may provide evidence of an offence against this Act is, or will be, at the place within the next 7 days.</txt></block></subclause><subclause id="sec.192-ssec.2" guid="_53bb4c64-6a1d-49b1-b17a-2f27da8d7bf4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The warrant must state—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.192-ssec.2-para1.a" guid="_ad4407f3-4b5e-436c-a7af-2c10cba18a75" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the place to which the warrant applies; and</txt></block></li><li id="sec.192-ssec.2-para1.b" guid="_c64390ab-7a69-4d98-9952-0f8fb0725b8d" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">that a stated inspector or any inspector may with necessary and reasonable help and force—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.192-ssec.2-para1.b-para2.i" guid="_35fc566c-2fa9-4071-9043-48734b3c148f" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">enter the place and any other place necessary for entry to the place; and</txt></block></li><li id="sec.192-ssec.2-para1.b-para2.ii" guid="_0e3b1290-1e22-4473-a33d-a17715583510" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">exercise the inspector’s powers; and</txt></block></li></list></block></li><li id="sec.192-ssec.2-para1.c" guid="_d23a7901-be15-43ad-b442-feeb357e76b3" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">particulars of the offence that the magistrate considers appropriate; and</txt></block></li><li id="sec.192-ssec.2-para1.d" guid="_4c782533-f6a5-4c48-ae58-0047f58c209b" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">the name of the person suspected of having committed the offence unless the name is unknown or the magistrate considers it inappropriate to state the name; and</txt></block></li><li id="sec.192-ssec.2-para1.e" guid="_b13501c8-7531-453f-8614-1f63b1882225" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">the evidence that may be seized under the warrant; and</txt></block></li><li id="sec.192-ssec.2-para1.f" guid="_1867e9ae-6abf-4eb2-9d23-fc3550760b54" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">the hours of the day or night when the place may be entered; and</txt></block></li><li id="sec.192-ssec.2-para1.g" guid="_562a7405-3d5c-4450-8d1a-4ebce02dbf4f" status="uncommenced" provision.type="other"><no>(g)</no><block status="uncommenced"><txt break.before="1">the magistrate’s name; and</txt></block></li><li id="sec.192-ssec.2-para1.h" guid="_698bb9db-d5b5-47bf-9558-d040bb7ecc64" status="uncommenced" provision.type="other"><no>(h)</no><block status="uncommenced"><txt break.before="1">the day and time of the warrant’s issue; and</txt></block></li><li id="sec.192-ssec.2-para1.i" guid="_65055cba-2742-42e8-bcdc-ab350d72103d" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the day, within 14 days after the warrant’s issue, the warrant ends.</txt></block></li></list></block></subclause></clause><clause id="sec.193" guid="_21b16519-290d-48e0-9001-d151d69cf3a8" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>193</no><heading id="sec.193-he" guid="_64cd1902-48c0-421b-bd39-9dd9f458498f">Electronic application</heading><subclause id="sec.193-ssec.1" guid="_e4ca8eb1-f124-497c-a97d-ea3ee579cf7a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">An application (an <defterm id="sec.193-def.electronicapplication" guid="_6aa320c1-1f6a-4edc-b79c-154874389049" type="definition">electronic application</defterm>) for a warrant may be made by phone, fax, email, radio, video conferencing or another form of electronic communication if the inspector reasonably considers it necessary because of—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.193-ssec.1-para1.a" guid="_e9c528a7-4deb-4921-8c5e-3a15d505f8ac" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">urgent circumstances; or</txt></block></li><li id="sec.193-ssec.1-para1.b" guid="_7ee7abc4-057a-4193-9297-0adf595bbef6" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">other special circumstances, including, for example, the inspector’s remote location.</txt></block></li></list></block></subclause><subclause id="sec.193-ssec.2" guid="_196f4b8c-6670-4c87-8d51-fe931fa4edf1" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The application—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.193-ssec.2-para1.a" guid="_daa43c80-2078-4a1f-a06c-5ebf9b3dd254" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">may not be made before the inspector prepares the written application under section 191(2); but</txt></block></li><li id="sec.193-ssec.2-para1.b" guid="_9337e4ba-6edc-49f1-bfa3-76add6227610" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">may be made before the written application is sworn.</txt></block></li></list></block></subclause></clause><clause id="sec.194" guid="_6ba39983-a218-46b1-a98d-29be7341a791" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>194</no><heading id="sec.194-he" guid="_54da6e78-69b6-49fa-a8f3-7b4896c51de1">Additional procedure for electronic application</heading><subclause id="sec.194-ssec.1" guid="_d0d49f8f-0db9-4d5d-95a9-26cc3bfa5cbb" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">If the magistrate receives an electronic application, the magistrate may issue the warrant (the <defterm id="sec.194-def.originalwarrant" guid="_12f1b9a7-d9a8-4474-a6ca-9183effa659f" type="definition">original warrant</defterm>) only if satisfied—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.194-ssec.1-para1.a" guid="_7ca23874-5f0f-41b8-b3f9-94f064d1082c" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">it was necessary in the circumstances for the application to be made as an electronic application; and</txt></block></li><li id="sec.194-ssec.1-para1.b" guid="_c69e4d00-1a5f-4374-a7b6-30e754bd1fc2" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the electronic application was made as required under section 193(2).</txt></block></li></list></block></subclause><subclause id="sec.194-ssec.2" guid="_5848434e-bcd0-4249-bf24-c541c8b1f156" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">After the magistrate issues the original warrant—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.194-ssec.2-para1.a" guid="_6b2ce86e-4319-42ee-9082-8c9be49164e1" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if there is a reasonably practicable way of immediately giving a copy of the warrant to the inspector (by emailing or faxing the copy, for example), the magistrate must immediately give a copy of the warrant (a <defterm id="sec.194-ssec.2-def.duplicatewarrant" guid="_c43df85f-6efe-4664-94af-b233c89b4c43" type="definition">duplicate warrant</defterm>) to the inspector; or</txt></block></li><li id="sec.194-ssec.2-para1.b" guid="_572c0546-cb50-45f3-92ca-3bc0f4318892" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">otherwise—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.194-ssec.2-para1.b-para2.i" guid="_b96bd518-1964-4fe5-b73b-bdc56cadd73c" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the magistrate must tell the inspector the information stated in section 192(2); and</txt></block></li><li id="sec.194-ssec.2-para1.b-para2.ii" guid="_e9b5daec-036d-4e69-81f3-47301460a2ec" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the inspector must complete a form of warrant (also a <defterm id="sec.194-ssec.2-para1.b-def.duplicatewarrant" guid="_6a95284c-f761-4afa-9546-d9af7a16550a" type="definition">duplicate warrant</defterm>), including by writing on the form the information stated in section 192(2) provided by the magistrate.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.194-ssec.3" guid="_dffccbfe-4d10-44cb-a0b5-5c703fe84304" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The duplicate warrant is a duplicate of, and as effective as, the original warrant.</txt></block></subclause><subclause id="sec.194-ssec.4" guid="_88549d70-cf37-4704-be7c-96876830458d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The inspector must, at the first reasonable opportunity, send to the magistrate—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.194-ssec.4-para1.a" guid="_f301c729-041c-4a48-a036-19bb354d501a" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the written application complying with section 191(2) and (3); and</txt></block></li><li id="sec.194-ssec.4-para1.b" guid="_942d6493-e4c4-4cbc-825b-61f975db327d" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the inspector completed a form of warrant under subsection (2)(b), the completed form of warrant.</txt></block></li></list></block></subclause><subclause id="sec.194-ssec.5" guid="_5bb7a849-ac2c-4e02-8147-f1e65cb1a85d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The magistrate must keep the original warrant and, on receiving the documents under subsection (4)—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.194-ssec.5-para1.a" guid="_6381e2b7-0a26-4b4a-baca-50fb69d3461c" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">attach the documents to the original warrant; and</txt></block></li><li id="sec.194-ssec.5-para1.b" guid="_77c11d95-af8f-41d7-bfad-1023719ed75e" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">give the original warrant and documents to the clerk of the court of the relevant magistrates court.</txt></block></li></list></block></subclause><subclause id="sec.194-ssec.6" guid="_6536a544-bbf7-4960-b3c9-e6ecce67b7a8" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">Despite subsection (3), if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.194-ssec.6-para1.a" guid="_4e564a7a-c6df-4d90-9816-50f5473f37d8" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">an issue arises in a proceeding about whether a warrant issued under this section authorised an exercise of a power; and</txt></block></li><li id="sec.194-ssec.6-para1.b" guid="_7222e632-b308-4e79-bcf9-30a891d338fc" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the original warrant is not produced in evidence;</txt></block></li></list></block><block status="uncommenced"><txt break.before="1">the onus of proof is on the person relying on the lawfulness of the exercise of the power to prove a warrant authorised the exercise of the power.</txt></block></subclause><subclause id="sec.194-ssec.7" guid="_250e234e-4793-4c4b-8c50-4384550f2d6a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">This section does not limit section 191.</txt></block></subclause><subclause id="sec.194-ssec.8" guid="_46c5e68c-b013-47d7-83d7-80b68d89f952" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(8)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.194-ssec.8-def.relevantmagistratescourt_" guid="_4c2e88e1-a427-4801-848e-dbb97f0c25c0" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.194-ssec.8-def.relevantmagistratescourt" guid="_7a7ec6d9-8f20-4fe8-a84d-bd03f15dedd3" type="definition">relevant magistrates court</defterm>, in relation to a magistrate, means the Magistrates Court that the magistrate constitutes under the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Magistrates Act 1991</name></legref>.</txt></definition></deflist></block></subclause></clause><clause id="sec.195" guid="_516abb69-d73c-42fe-9764-76c48c28666f" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>195</no><heading id="sec.195-he" guid="_e31ac524-4f10-4003-9553-bfea9bdca682">Defect in relation to a warrant</heading><subclause id="sec.195-ssec.1" guid="_1e2afba6-50f3-47e1-b921-a9d06ce9fb35" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A warrant is not invalidated by a defect in—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.195-ssec.1-para1.a" guid="_88647d43-5a05-4f26-a80f-28bf1ad0159d" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the warrant; or</txt></block></li><li id="sec.195-ssec.1-para1.b" guid="_2c21a476-37dc-44e0-9b75-ff9159ba7dd4" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">complying with this subdivision;</txt></block></li></list><txt break.before="1">unless the defect affects the substance of the warrant in a material particular.</txt></block></subclause><subclause id="sec.195-ssec.2" guid="_a39fd5f1-0372-4686-a150-e1ccb6aed817" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.195-ssec.2-def.warrant_" guid="_488ccb3e-64f1-4377-b6df-d8769e8d79e2" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.195-ssec.2-def.warrant" guid="_db61bceb-0224-415b-b5bf-c1a7062d2286" type="definition">warrant</defterm> includes a duplicate warrant.</txt></definition></deflist></block></subclause></clause></subdivision><subdivision id="ch.5-pt.7-div.3-sdiv.2" guid="_5818df96-57e3-4d73-a8e3-4476652865fc" status="uncommenced" affected.by.uncommenced="0"><no>Subdivision 2</no><heading id="ch.5-pt.7-div.3-sdiv.2-he" guid="_f591d365-94fc-45d4-a4d3-8967596d2aad">Entry procedure</heading><clause id="sec.196" guid="_34c64460-5acf-46e6-84ef-72b269289d5a" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>196</no><heading id="sec.196-he" guid="_d7258705-eee3-4592-a008-d8a74d0692a0">Entry procedure</heading><subclause id="sec.196-ssec.1" guid="_bf3ee473-6c86-4e89-8011-122e1b279464" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if an inspector intends to enter a place under a warrant issued under this Act.</txt></block></subclause><subclause id="sec.196-ssec.2" guid="_610d7044-0ab0-48cc-9fcf-2c15553a3443" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The inspector must do or make a reasonable attempt to do the following things before entering the place—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.196-ssec.2-para1.a" guid="_712b672b-9118-488d-8b26-ddcaf88c868d" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">identify himself or herself to a person who is an occupier of the place and is present by producing the inspector’s identity card or another document evidencing the inspector’s appointment;</txt></block></li><li id="sec.196-ssec.2-para1.b" guid="_bd6efebf-cf4d-4114-afda-2a30b1986a37" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">give a copy of the warrant to the person;</txt></block></li><li id="sec.196-ssec.2-para1.c" guid="_855e1081-7a99-4aae-ae78-5d3a5ba91555" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">tell the person that the warrant authorises the inspector to enter the place;</txt></block></li><li id="sec.196-ssec.2-para1.d" guid="_e5888737-d1f5-4213-b55a-df92f1dc6b43" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">give the person an opportunity to allow the inspector to immediately enter the place without using force.</txt></block></li></list></block></subclause><subclause id="sec.196-ssec.3" guid="_42630b65-47ae-4d52-b88f-7909c2d6c980" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">However, the inspector need not comply with subsection (2) if the inspector reasonably believes that entry to the place without compliance is required to ensure the execution of the warrant is not frustrated.</txt></block></subclause><subclause id="sec.196-ssec.4" guid="_0c791834-f869-4320-a1ca-37b4202ae942" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.196-ssec.4-def.warrant_" guid="_7d792b37-2833-445f-9ffb-fc9a10e4604c" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.196-ssec.4-def.warrant" guid="_87ec7db0-b60d-4d37-96a8-a53b38125266" type="definition">warrant</defterm> includes a duplicate warrant under section 194(3).</txt></definition></deflist></block></subclause></clause></subdivision></division><division id="ch.5-pt.7-div.4" guid="_8c72c8ce-7c96-4336-817e-ec8ba2f10f2c" status="uncommenced" affected.by.uncommenced="0"><no>Division 4</no><heading id="ch.5-pt.7-div.4-he" guid="_3ab3ab80-086d-4b07-b3be-27bcbd324778">General powers of inspectors after entering places</heading><clause id="sec.197" guid="_6d2d8752-55b7-4743-93ab-ddd3f1f0a885" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>197</no><heading id="sec.197-he" guid="_72ba2483-8892-4c98-b162-94f1308a4ed4">Application of this division</heading><subclause id="sec.197-ssec.1" guid="_1d59cf64-8518-4b8e-b1c1-7104fc79ca83" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This division applies if an inspector enters a place under section 186(1)(a) or (c).</txt></block></subclause><subclause id="sec.197-ssec.2" guid="_31518558-515a-4d47-8197-e1946ed3953f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, the powers in this division are subject to any conditions of the consent, or terms of the warrant, that allowed the entry.</txt></block></subclause></clause><clause id="sec.198" guid="_a01ab00b-3b6f-4e43-aca6-61d76e1a670e" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>198</no><heading id="sec.198-he" guid="_707e1519-494b-40ef-923b-9477b1398af8">General powers</heading><subclause id="sec.198-ssec.1" guid="_057f227e-2776-4d21-8643-8c8272fd0ae5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The inspector may do any of the following—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.198-ssec.1-para1.a" guid="_72b389b0-2166-41d8-8012-296984fbbeb0" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">search any part of the place;</txt></block></li><li id="sec.198-ssec.1-para1.b" guid="_268849be-b979-420b-9fae-61f543b32cc8" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">inspect, examine or film—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.198-ssec.1-para1.b-para2.i" guid="_b5dde37f-bfc9-4712-ab47-d6f2bb4a67dc" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">any part of the place; or</txt></block></li><li id="sec.198-ssec.1-para1.b-para2.ii" guid="_60947779-c96f-4145-87f2-ab3e6b2fa66c" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">anything at the place;</txt></block></li></list></block></li><li id="sec.198-ssec.1-para1.c" guid="_0da120e3-5bda-4d61-9efe-62a28d281a80" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">take for examination a thing, or a sample of or from a thing, at the place;</txt></block></li><li id="sec.198-ssec.1-para1.d" guid="_31d7c7b3-8faa-48c9-a059-e902c7edc572" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">place an identifying mark in or on anything at the place;</txt></block></li><li id="sec.198-ssec.1-para1.e" guid="_de8a1f62-647e-4dc5-8164-9564185db2b8" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">take an extract from, or copy, a document at the place, or take the document to another place to copy;</txt></block></li><li id="sec.198-ssec.1-para1.f" guid="_21f016b9-12ca-48c8-98b2-46c06d784daa" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">produce an image or writing at the place from an electronic document or, to the extent it is not practicable, take a thing containing an electronic document to another place to produce an image or writing;</txt></block></li><li id="sec.198-ssec.1-para1.g" guid="_663e1032-8aa1-4991-9e3f-fcf284f1f394" status="uncommenced" provision.type="other"><no>(g)</no><block status="uncommenced"><txt break.before="1">take to, into or onto the place and use any person, equipment and materials the inspector reasonably requires for exercising the inspector’s powers under this division;</txt></block></li><li id="sec.198-ssec.1-para1.h" guid="_f39a022d-2f91-4fef-ba39-7a48885575d0" status="uncommenced" provision.type="other"><no>(h)</no><block status="uncommenced"><txt break.before="1">remain at the place for the time necessary to achieve the purpose of the entry.</txt></block></li></list></block></subclause><subclause id="sec.198-ssec.2" guid="_333104df-6b5f-41ee-be23-360fecc4eea0" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The inspector may take a necessary step to allow the exercise of a power stated in subsection (1).</txt></block></subclause><subclause id="sec.198-ssec.3" guid="_8c06022a-efe4-4734-bf68-97db46c9042c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">If the inspector takes a document from the place to copy it, the inspector must copy the document and return it to the place as soon as practicable.</txt></block></subclause><subclause id="sec.198-ssec.4" guid="_7771a07a-70a6-47d2-86e3-957962523cef" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">If the inspector takes from the place a device reasonably capable of producing a document from an electronic document to produce the document, the inspector must produce the document and return the device to the place as soon as practicable.</txt></block></subclause><subclause id="sec.198-ssec.5" guid="_701ef149-bcd5-4683-9ab9-2444841d1401" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.198-ssec.5-def.film_" guid="_530b3b5b-e785-4220-81ff-202088e79793" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.198-ssec.5-def.film" guid="_3e3d3628-2db9-421e-a873-85614ab4e1ab" type="definition">film</defterm> includes photograph, videotape and record an image in another way.</txt></definition><definition id="sec.198-ssec.5-def.inspect_" guid="_1a042a9c-0b46-4318-9b9d-a4039a8f51ba" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.198-ssec.5-def.inspect" guid="_db6c7a15-5d42-4be2-b19e-b48f18f2c9e8" type="definition">inspect</defterm>, a thing, includes open the thing and examine its contents.</txt></definition></deflist></block></subclause></clause><clause id="sec.199" guid="_0f0e592c-6042-4801-8c5e-1476e91e4a4a" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>199</no><heading id="sec.199-he" guid="_7f3b93ee-5d9e-4797-8fec-37ab4bfa546d">Requiring reasonable help</heading><subclause id="sec.199-ssec.1" guid="_fcf2c2b8-f96f-4575-ba24-43d933da0906" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The inspector may require an occupier of the place, or a person at the place, to give the inspector reasonable help to exercise a power stated in section 198(1).</txt></block></subclause><subclause id="sec.199-ssec.2" guid="_072e7dba-75fb-4793-bf35-2df27f217a62" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">When making the requirement, the inspector must give the person an offence warning for the requirement.</txt></block></subclause><subclause id="sec.199-ssec.3" guid="_2c7466b0-9f69-41b7-b13e-791ac153c99d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The person must comply with the requirement, unless the person has a reasonable excuse.</txt></block><penalty id="sec.199-ssec.3-pen" guid="_f121491e-d15e-4f55-a12f-e135d0f30b51"><block status="uncommenced"><txt break.before="1">Maximum penalty—40 penalty units.</txt></block></penalty></subclause><subclause id="sec.199-ssec.4" guid="_9a5f8450-995a-4d38-bd69-83802f980e47" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">It is a reasonable excuse for an individual not to comply with the requirement if complying might tend to incriminate the individual or expose the individual to a penalty.</txt></block></subclause><subclause id="sec.199-ssec.5" guid="_3a8e9a68-2af9-4138-bb6a-e8cb8d16922f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">However, subsection (4) does not apply if a document or information that is the subject of the requirement is required to be held or kept by the individual under this Act.</txt></block><note id="sec.199-ssec.5-note" guid="_2dcf5ea6-1ed5-4a6a-b95a-88f6ec48f398" type="example"><heading id="sec.199-ssec.5-note-he" guid="_d4395766-c325-4e94-a5d7-d7b00fdc1b2d">Note—</heading><block status="uncommenced"><txt break.before="1">However, see section 224 (which is about evidential immunity).</txt></block></note></subclause></clause></division></part><part id="ch.5-pt.8" guid="_21509aa7-b573-4839-8a06-6c654c2449a3" status="uncommenced" affected.by.uncommenced="0"><no>Part 8</no><heading id="ch.5-pt.8-he" guid="_2d31ecee-7945-4926-bd96-52e86904087d">Other inspectors’ powers and related matters</heading><division id="ch.5-pt.8-div.1" guid="_94dd9e6b-8608-4e35-bee7-0eda8bdbcb31" status="uncommenced" affected.by.uncommenced="0"><no>Division 1</no><heading id="ch.5-pt.8-div.1-he" guid="_543f7042-04f8-4391-a250-29cda7ab8595">Stopping or moving vehicles</heading><clause id="sec.200" guid="_6106ae63-8685-4c79-b6da-c36835f43e3e" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>200</no><heading id="sec.200-he" guid="_40a467e1-330d-4e96-91a5-4ab3dfe1294d">Application of division</heading><block status="uncommenced"><txt break.before="1">This division applies if an inspector reasonably suspects, or is aware, that a thing in or on a vehicle may provide evidence of the commission of an offence against this Act.</txt></block></clause><clause id="sec.201" guid="_91e9cc1d-8d2d-4347-9510-59d27bd63fab" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>201</no><heading id="sec.201-he" guid="_875dbf21-99d7-47ee-bf47-dd42ac1b302b">Power to stop or move</heading><subclause id="sec.201-ssec.1" guid="_4b256790-3a0f-4445-9271-05d2ed6f295d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">If the vehicle is moving, the inspector may, to exercise the inspector’s powers, signal or otherwise direct the person in control of the vehicle to stop the vehicle and to bring the vehicle to, and keep it at, a convenient place within a reasonable distance to allow the inspector to exercise the powers.</txt></block></subclause><subclause id="sec.201-ssec.2" guid="_7ad797e1-e0e2-42a5-a6c2-8823f0c65e2f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">If the vehicle is stopped, the inspector may direct the person in control of the vehicle—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.201-ssec.2-para1.a" guid="_f920e85e-0303-43ff-af44-4eb333bee7d5" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">not to move it until the inspector has exercised the inspector’s powers; or</txt></block></li><li id="sec.201-ssec.2-para1.b" guid="_dba105f8-70ac-4f7b-9516-1233451f5bfa" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">to move the vehicle to, and keep it at, a stated reasonable place to allow the inspector to exercise the powers.</txt></block></li></list></block></subclause><subclause id="sec.201-ssec.3" guid="_ca9aada8-eee6-444f-af3d-b5404d1b3552" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">When giving the direction under subsection (2), the inspector must give the person in control an offence warning for the direction.</txt></block></subclause></clause><clause id="sec.202" guid="_10e18be6-e926-41dd-bbac-0a35a375c2e9" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>202</no><heading id="sec.202-he" guid="_9d426c1a-3d9b-44c2-bfb8-210db3701e83">Identification requirements if vehicle moving</heading><subclause id="sec.202-ssec.1" guid="_adc1754f-368d-4225-b8ab-9bd5ba49dbaa" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if the inspector proposes to give a direction under section 201(1) and the vehicle is moving.</txt></block></subclause><subclause id="sec.202-ssec.2" guid="_402075c2-7c3a-4233-9b9e-0bbaca7e59ba" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The inspector must clearly identify himself or herself as an inspector exercising the inspector’s powers (by using a sign or loud hailer, for example).</txt></block></subclause><subclause id="sec.202-ssec.3" guid="_5cba4167-0a68-49a0-97d7-52adab46117d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">When the vehicle stops, the inspector must immediately produce the inspector’s identity card for the inspection of the person in control of the vehicle.</txt></block></subclause><subclause id="sec.202-ssec.4" guid="_7af9874b-71fa-4ca7-a600-cb7fed3a5dbb" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">Subsection (3) applies despite section 185.</txt></block></subclause></clause><clause id="sec.203" guid="_212fefe2-896b-434b-9636-9d7226625045" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>203</no><heading id="sec.203-he" guid="_f76fcf9a-84d7-44fa-bb65-dc58556a79bc">Failure to comply with direction</heading><subclause id="sec.203-ssec.1" guid="_53e32c78-adf4-4c4b-92bb-edeb7b0fdaf9" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The person in control of the vehicle must comply with a direction under section 201 unless the person has a reasonable excuse.</txt><penalty id="sec.203-ssec.1-pen" guid="_dec9e963-c844-4f59-9cc7-865223f4109e"><block status="uncommenced"><txt break.before="1">Maximum penalty—60 penalty units.</txt></block></penalty></block></subclause><subclause id="sec.203-ssec.2" guid="_bd01dab0-9f2a-4fb0-99d0-ea69975a6e0a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">It is a reasonable excuse for the person not to comply with a direction if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.203-ssec.2-para1.a" guid="_7456875b-fbd7-474b-a3c9-904d978215bc" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the vehicle was moving and the inspector did not comply with section 202; or</txt></block></li><li id="sec.203-ssec.2-para1.b" guid="_c6630b6b-8a82-4f50-9351-8145f936a1d1" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">to comply immediately would have endangered someone else or caused loss or damage to property, and the person complies as soon as it is practicable to do so.</txt></block></li></list></block></subclause><subclause id="sec.203-ssec.3" guid="_337ef060-8953-4b9f-810a-912878defc1a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">Subsection (2) does not limit subsection (1).</txt></block></subclause><subclause id="sec.203-ssec.4" guid="_d5447972-0256-4ae2-9ac3-26cadb50d519" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">A person does not commit an offence against subsection (1) if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.203-ssec.4-para1.a" guid="_671568b0-a036-41e4-afad-88a86706b0f5" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the direction the person fails to comply with is given under section 201(2); and</txt></block></li><li id="sec.203-ssec.4-para1.b" guid="_eb2883e9-a249-460b-9ae1-b4a12b1dfae4" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the person is not given an offence warning for the direction.</txt></block></li></list></block></subclause></clause></division><division id="ch.5-pt.8-div.2" guid="_42801381-2b33-4f39-83f5-8263373a4dfd" status="uncommenced" affected.by.uncommenced="0"><no>Division 2</no><heading id="ch.5-pt.8-div.2-he" guid="_db336659-6430-4d07-bc3f-10f523735202">Seizure by inspectors and forfeiture</heading><subdivision id="ch.5-pt.8-div.2-sdiv.1" guid="_ae646002-78e6-4049-b242-cfeaa9f6367a" status="uncommenced" affected.by.uncommenced="0"><no>Subdivision 1</no><heading id="ch.5-pt.8-div.2-sdiv.1-he" guid="_f73fd8fe-9271-4761-8eb4-43bdc506e44c">Power to seize</heading><clause id="sec.204" guid="_b7d535bf-7819-47f1-ade4-f04ca75b6651" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>204</no><heading id="sec.204-he" guid="_7c4ed13d-e8df-4039-9c94-4811b3ef293b">Seizing evidence at a place that may be entered without consent or warrant</heading><subclause id="sec.204-ssec.1" guid="_c7267616-ab98-4053-95be-27acfd0de989" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if an inspector enters a place that the inspector may enter under this Act without the consent of an occupier of the place or a warrant.</txt></block></subclause><subclause id="sec.204-ssec.2" guid="_50831c0f-d4d7-4380-b4f3-2b83703772e6" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The inspector may seize a thing at the place if the inspector reasonably believes the thing is evidence of an offence against this Act.</txt></block></subclause></clause><clause id="sec.205" guid="_48681933-ffcb-449e-81cf-f66ec98f0ed4" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>205</no><heading id="sec.205-he" guid="_d287f604-efb2-45bc-b230-54b492040fea">Seizing evidence at a place entered with consent</heading><subclause id="sec.205-ssec.1" guid="_fcbf16bd-cbaf-4d03-ab96-1efc2656c9ef" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.205-ssec.1-para1.a" guid="_17aaa36a-d1f3-4c96-9973-c46ae01c9209" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">an inspector may enter a place under this Act only with the consent of an occupier of the place or under a warrant; and</txt></block></li><li id="sec.205-ssec.1-para1.b" guid="_67d51143-078a-4b64-9306-e561fea1da41" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the inspector enters the place after getting the consent.</txt></block></li></list></block></subclause><subclause id="sec.205-ssec.2" guid="_28bbfb4e-9ea0-415a-b47b-c2e89b41def6" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The inspector may seize a thing at the place only if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.205-ssec.2-para1.a" guid="_836b2191-bc30-4747-953b-e74c82ba5226" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the inspector reasonably believes the thing is evidence of an offence against this Act; and</txt></block></li><li id="sec.205-ssec.2-para1.b" guid="_7ca6c028-2146-4ef9-ae21-460b4443485a" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">seizing the thing is consistent with the purpose of entry, as explained to the occupier when asking for the occupier’s consent.</txt></block></li></list></block></subclause></clause><clause id="sec.206" guid="_96ca21aa-9a02-46bc-b461-3e51c4b9ccf7" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>206</no><heading id="sec.206-he" guid="_1b2a7dd4-0669-42c5-ac14-ae81d8265f7f">Seizing evidence at a place entered with warrant</heading><subclause id="sec.206-ssec.1" guid="_2232f6f6-918e-40ba-b7f4-d675f6c24558" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.206-ssec.1-para1.a" guid="_5e694192-3919-4e03-8dec-2a267b4e4de3" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">an inspector may enter a place under this Act only with the consent of an occupier of the place or under a warrant; and</txt></block></li><li id="sec.206-ssec.1-para1.b" guid="_8ce3f04b-bbe1-4095-b7b0-5032a4c94943" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the inspector enters the place under a warrant.</txt></block></li></list></block></subclause><subclause id="sec.206-ssec.2" guid="_845ccc6a-b4b5-4ba9-a020-d3b53795dbf7" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The inspector may seize the evidence for which the warrant was issued.</txt></block></subclause><subclause id="sec.206-ssec.3" guid="_aff295f6-e93d-4799-894a-e14abe8a6488" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The inspector may also seize anything else at the place if the inspector reasonably believes—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.206-ssec.3-para1.a" guid="_5623d61e-8166-49d3-b4aa-ccb6cf67f6d8" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the thing is evidence of an offence against this Act; and</txt></block></li><li id="sec.206-ssec.3-para1.b" guid="_47342329-c6d7-49dc-849d-16a9e1d47bf1" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">seizing the thing is necessary to prevent the thing being destroyed, hidden or lost.</txt></block></li></list></block></subclause><subclause id="sec.206-ssec.4" guid="_4fea6bf5-521a-48e0-90cb-b6d369a3536e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The inspector may also seize a thing at the place if the inspector reasonably believes the thing has immediately been used in committing an offence against this Act.</txt></block></subclause></clause><clause id="sec.207" guid="_66414761-468a-4fc0-8401-24a3c780ac9c" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>207</no><heading id="sec.207-he" guid="_52cc7593-8451-4577-bd3f-4d5d7d5fd02a">Seizing property subject to security</heading><subclause id="sec.207-ssec.1" guid="_31cf1ff7-00f0-4baf-90f3-da5d369d519a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">An inspector may seize a thing, and exercise powers relating to the thing, despite a lien or other security over the thing claimed by another person.</txt></block></subclause><subclause id="sec.207-ssec.2" guid="_ecfe7dde-2408-4a29-9b77-035a02ec3b84" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, the seizure does not affect the other person’s claim to the lien or other security against a person, other than the inspector or a person acting for the inspector.</txt></block></subclause></clause><clause id="sec.208" guid="_d687b5cb-9982-447a-b998-f44b748fabec" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>208</no><heading id="sec.208-he" guid="_78c9d271-cc22-4654-9ad4-b7d70af03374">Securing seized thing</heading><subclause id="sec.208-ssec.1" guid="_60c9a6d8-b8be-4881-89c4-8aad1c315ea4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">After seizing a thing under this division, an inspector may—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.208-ssec.1-para1.a" guid="_55802e9b-8584-4faf-b196-05c94e306df3" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">move the thing from the place (the <defterm id="sec.208-ssec.1-def.placeofseizure" guid="_3454418c-a204-4294-a1a7-fd5cbd5e4342" type="definition">place of seizure</defterm>) where the thing was seized; or</txt></block></li><li id="sec.208-ssec.1-para1.b" guid="_25d40165-c665-4b6d-b0a5-bdb49707e46a" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">leave the thing at the place of seizure and take reasonable action to restrict access to the thing.</txt></block></li></list></block></subclause><subclause id="sec.208-ssec.2" guid="_652fc51f-5cf7-4cc1-92dd-bb70b65545c6" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">For subsection (1)(b), the inspector may, for example—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.208-ssec.2-para1.a" guid="_41e0f676-c4a1-499b-a2b4-c96bb5e7ac51" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">seal the thing, or the entrance to the place of seizure, and mark the thing or place to show access to the thing or place is restricted; or</txt></block></li><li id="sec.208-ssec.2-para1.b" guid="_6d55c33b-d2e9-40ce-be8f-e17a14882a47" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for equipment—make the thing inoperable; or</txt><note id="sec.208-ssec.2-para1.b-note" guid="_5a6f1157-5ed5-412c-b6ff-a4a6ae3a8574" type="example"><heading id="sec.208-ssec.2-para1.b-note-he" guid="_94d2c6ce-2611-442e-8e57-dd37798c102e">Examples of making equipment inoperable—</heading><block status="uncommenced"><txt break.before="1">dismantling the equipment or removing a component without which the equipment can not be used</txt></block></note></block></li><li id="sec.208-ssec.2-para1.c" guid="_6eb6b435-a72e-4c2f-92a5-0d81293be04d" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">require a person who the inspector reasonably believes is in control of the place or thing to do—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.208-ssec.2-para1.c-para2.i" guid="_3fada483-6672-4fcd-a0d5-72d558b2be2b" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">an act stated in paragraph (a) or (b); or</txt></block></li><li id="sec.208-ssec.2-para1.c-para2.ii" guid="_d174ad19-e92f-4b48-9306-94e548ac1251" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">anything else an inspector could do under subsection (1)(a).</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.208-ssec.3" guid="_42425e04-3567-48e2-ba64-4f44564aff95" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The person must comply with a requirement made of the person under subsection (2)(c), unless the person has a reasonable excuse.</txt><penalty id="sec.208-ssec.3-pen" guid="_c154d3b7-2b6c-441f-a01f-d16a815f3f3f"><block status="uncommenced"><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></block></subclause><subclause id="sec.208-ssec.4" guid="_cf9f126f-cddf-4548-a72c-4c349b2e43ee" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">If an inspector restricts access to a seized thing, a person must not tamper with the thing, or with anything used to restrict access to the thing, without—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.208-ssec.4-para1.a" guid="_cc6bc87b-e3eb-475c-97b0-df6e3139e29a" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">an inspector’s approval; or</txt></block></li><li id="sec.208-ssec.4-para1.b" guid="_0e40c22e-0ec7-4780-abd7-0e2a2890a272" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a reasonable excuse.</txt></block></li></list><penalty id="sec.208-ssec.4-pen" guid="_cb557da7-5551-44bc-94aa-34bfa4f254e7"><block status="uncommenced"><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></block></subclause><subclause id="sec.208-ssec.5" guid="_d36eb814-033c-451d-b8c6-b059933cac0c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">If an inspector restricts access to a place, a person must not enter the place in contravention of the restriction, or tamper with anything used to restrict access to the place, without—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.208-ssec.5-para1.a" guid="_07f04994-bbd9-4a9c-ba7e-84909c055dad" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">an inspector’s approval; or</txt></block></li><li id="sec.208-ssec.5-para1.b" guid="_5cda3e1d-a5b7-4f48-954b-b2f964d55e5c" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a reasonable excuse.</txt></block></li></list><penalty id="sec.208-ssec.5-pen" guid="_5702f367-c5a5-4b88-8cca-0e320f73c78c"><block status="uncommenced"><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></block></subclause></clause></subdivision><subdivision id="ch.5-pt.8-div.2-sdiv.2" guid="_30ed4374-9bcc-4c58-a26b-6518a84d3785" status="uncommenced" affected.by.uncommenced="0"><no>Subdivision 2</no><heading id="ch.5-pt.8-div.2-sdiv.2-he" guid="_9d3eeb5d-a97a-4fd8-8930-e2f58a2f1ab5">Safeguards for seized things</heading><clause id="sec.209" guid="_7e15c93e-0fe0-44c8-bc2f-f34e9adbbd6c" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>209</no><heading id="sec.209-he" guid="_2c6888cc-5863-4d75-8918-c042cafb2d01">Receipt and decision notice for seized thing</heading><subclause id="sec.209-ssec.1" guid="_85034080-94f0-43e4-9881-579a065e693b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if an inspector seizes anything under this division unless—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.209-ssec.1-para1.a" guid="_1aadaf0d-1c44-45ed-94f1-06860fadcf54" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the inspector reasonably believes there is no-one apparently in possession of the thing or it has been abandoned; or</txt></block></li><li id="sec.209-ssec.1-para1.b" guid="_58a9d4f6-e960-4a24-b4b4-12e06629cd30" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">because of the condition, nature and value of the thing it would be unreasonable to require the inspector to comply with this section.</txt></block></li></list></block></subclause><subclause id="sec.209-ssec.2" guid="_7ae674d4-9c28-4395-9836-c426f5e1a8d5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The inspector must, as soon as practicable after seizing the thing, give the following to an owner or person in control of the thing before it was seized—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.209-ssec.2-para1.a" guid="_37b7e751-6215-42b3-b5a8-c2619e8d48ae" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a receipt for the thing that generally describes the thing and its condition;</txt></block></li><li id="sec.209-ssec.2-para1.b" guid="_5f540f7f-e09f-4f7d-ac8e-d42c8d8e0e17" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a decision notice about the decision to seize the thing.</txt></block></li></list></block></subclause><subclause id="sec.209-ssec.3" guid="_eb8a4f92-e265-45c8-8641-96b61f717305" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">However, if an owner or person from whom the thing is seized is not present when the thing is seized, the receipt and decision notice may be given by leaving them in a conspicuous position, and in a reasonably secure way, at the place at which the thing is seized.</txt></block></subclause><subclause id="sec.209-ssec.4" guid="_ef42b9f1-6dcb-42b9-a232-f8bf309bd3f4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The receipt and decision notice may—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.209-ssec.4-para1.a" guid="_119226b4-65d9-4152-8600-8210941c6369" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">be given in the same document; and</txt></block></li><li id="sec.209-ssec.4-para1.b" guid="_e88e3694-a293-4342-8699-8b8ef1b410d8" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">relate to more than 1 seized thing.</txt></block></li></list></block></subclause><subclause id="sec.209-ssec.5" guid="_584c3f4d-14e8-40bb-bcee-4654474c7903" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The inspector may delay giving the receipt and decision notice if the inspector reasonably suspects giving them may frustrate or otherwise hinder an investigation by the inspector under this Act.</txt></block></subclause><subclause id="sec.209-ssec.6" guid="_d9f1f358-6cff-4db5-8149-836570a5e98e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">However, the delay may be only for as long as the inspector continues to have the reasonable suspicion and remains in the vicinity of the place at which the thing was seized to keep the thing under observation.</txt></block></subclause></clause><clause id="sec.210" guid="_6344d0ef-eb60-4d61-8220-2b25e7ca2b93" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>210</no><heading id="sec.210-he" guid="_ba57fe78-96e6-4088-8901-8cf42c059f9c">Access to seized thing</heading><subclause id="sec.210-ssec.1" guid="_1edd52ad-4173-414e-997b-14039779187e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies until a seized thing is forfeited or returned.</txt></block></subclause><subclause id="sec.210-ssec.2" guid="_5c206ed1-d962-43da-b105-9aa61e899448" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The inspector who seized the thing must allow an owner of the thing, free of charge—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.210-ssec.2-para1.a" guid="_0d92c6e8-2c57-4084-a77e-4599108a2fd0" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">to inspect the thing at any reasonable time, and from time to time; and</txt></block></li><li id="sec.210-ssec.2-para1.b" guid="_8e247c69-0370-4d61-840f-d0da03acc57f" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the thing is a document—to copy the document.</txt></block></li></list></block></subclause><subclause id="sec.210-ssec.3" guid="_d03cbcc8-17a0-4047-bd35-e8069e0a189d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">However, subsection (2) does not apply if it is impracticable or would be unreasonable to allow the owner to inspect or copy the thing.</txt></block></subclause></clause><clause id="sec.211" guid="_680c2b70-9f5c-4e12-89ae-be1659144b73" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>211</no><heading id="sec.211-he" guid="_c39be680-223a-4d5f-880e-2ea12e5eb1a4">Returning seized thing</heading><subclause id="sec.211-ssec.1" guid="_5862e13b-1b00-42b0-8a2c-f2e4df693387" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if a seized thing is not—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.211-ssec.1-para1.a" guid="_a9a36ce4-d17f-4777-ac61-90873d8a8a9a" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">forfeited under subdivision 3; or</txt></block></li><li id="sec.211-ssec.1-para1.b" guid="_43a080be-a974-40d5-80a6-3e305456a1ca" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">subject to a disposal order under division 3.</txt></block></li></list></block></subclause><subclause id="sec.211-ssec.2" guid="_72b22b71-b675-4c65-a58f-23edbfae1a3c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">As soon as the chief executive stops being satisfied there are reasonable grounds for keeping the thing, the chief executive must return the thing to its owner.</txt></block></subclause><subclause id="sec.211-ssec.3" guid="_22fc134b-d4c2-4512-b367-5e54495ab730" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">If the thing is not returned to its owner within 3 months after the thing was seized, the owner may apply to the chief executive for its return.</txt></block></subclause><subclause id="sec.211-ssec.4" guid="_a23d269f-4e5d-4081-ab00-7a163e4ee1f9" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">Within 30 days after receiving the application, the chief executive must—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.211-ssec.4-para1.a" guid="_f476a383-0e53-4d14-bddb-829884bde740" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if the chief executive is satisfied there are reasonable grounds for keeping the thing and decides to keep the thing—give a decision notice to the owner; or</txt></block></li><li id="sec.211-ssec.4-para1.b" guid="_3526b81d-269d-4574-9917-6a9b46a9bec2" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">otherwise—return the thing to the owner.</txt></block></li></list></block></subclause><subclause id="sec.211-ssec.5" guid="_0fa6b37a-f8cc-4833-9645-75a2dae272f4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">For this section, there are reasonable grounds for keeping the thing if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.211-ssec.5-para1.a" guid="_3dbcb317-e991-4a67-a095-c93f2ecb1ada" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the thing is being, or is likely to be, examined; or</txt></block></li><li id="sec.211-ssec.5-para1.b" guid="_aa55dc8e-f9b2-4956-b30a-d123cd78f9ce" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the thing is needed, or may be needed, for—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.211-ssec.5-para1.b-para2.i" guid="_031bc263-f31e-4ffd-8604-e11a683f321c" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a proceeding for an offence against this Act that is likely to be started or that has been started but not completed; or</txt></block></li><li id="sec.211-ssec.5-para1.b-para2.ii" guid="_fb205f78-7707-4714-8a4b-f6f11051c542" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">an appeal from a decision in a proceeding for an offence against this Act; or</txt></block></li></list></block></li><li id="sec.211-ssec.5-para1.c" guid="_9a2d896a-2443-4642-8048-18bdce5035ee" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">it is not lawful for the owner to possess the thing.</txt></block></li></list></block></subclause><subclause id="sec.211-ssec.6" guid="_37aa39c4-49b1-411b-a567-92e37a292e4c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">Subsection (5) does not limit the grounds that may be reasonable grounds for keeping the thing.</txt></block></subclause><subclause id="sec.211-ssec.7" guid="_a050c6dd-a0a6-40be-9517-b81d6a753b2c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">Nothing in this section affects a lien or other security over the seized thing.</txt></block></subclause><subclause id="sec.211-ssec.8" guid="_1ce24d7c-225f-43ab-b52d-26a241034986" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(8)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.211-ssec.8-def.owner_" guid="_a6909987-e333-48c5-8335-772eadd7f29c" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.211-ssec.8-def.owner" guid="_cad89aa8-f8a8-4609-b09e-c4d937fdcc5f" type="definition">owner</defterm>, of a seized thing, includes a person who would be entitled to possession of the thing if it had not been seized.</txt></definition></deflist></block></subclause></clause></subdivision><subdivision id="ch.5-pt.8-div.2-sdiv.3" guid="_e4b65701-786e-4527-8c03-95cc0ce782d5" status="uncommenced" affected.by.uncommenced="0"><no>Subdivision 3</no><heading id="ch.5-pt.8-div.2-sdiv.3-he" guid="_876a475c-382a-4272-ae57-a0ce812f1344">Forfeiting seized things</heading><clause id="sec.212" guid="_999f60ca-5a35-42ca-b90f-4720ba1c0ec9" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>212</no><heading id="sec.212-he" guid="_04be1326-a1c9-4957-9da0-d575968cd127">Forfeiture by chief executive decision</heading><subclause id="sec.212-ssec.1" guid="_c6ddfdb6-5068-4547-af41-349ee797467f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The chief executive may decide a seized thing is forfeited to the State if an inspector—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.212-ssec.1-para1.a" guid="_e8008be2-2dd3-42b1-9e75-8fadf54e1d76" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">after making reasonable inquiries, can not find an owner; or</txt></block></li><li id="sec.212-ssec.1-para1.b" guid="_788147ca-5ddb-4bb3-a8bd-7c2903b8c6e1" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">after making reasonable efforts, can not return it to an owner; or</txt></block></li><li id="sec.212-ssec.1-para1.c" guid="_dff3ac1d-eb7e-4615-828d-2d4bae5211dd" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">reasonably believes it is necessary to keep the thing to prevent the thing being used to commit the offence for which the thing was seized.</txt></block></li></list></block></subclause><subclause id="sec.212-ssec.2" guid="_7396370e-a8bb-45a1-8796-7316d4d2231d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, the inspector is not required to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.212-ssec.2-para1.a" guid="_5d53c60a-13ab-4868-b3f9-5a4f5ee3cd99" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">make inquiries if it would be unreasonable to make inquiries to find an owner; or</txt></block></li><li id="sec.212-ssec.2-para1.b" guid="_daac31d9-bd3d-4218-8f13-a8c1e1754f71" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">make efforts if it would be unreasonable to make efforts to return the thing to an owner.</txt><note id="sec.212-ssec.2-para1.b-note" guid="_881d972f-a93b-424e-8792-f2cccd0bef1d" type="example"><heading id="sec.212-ssec.2-para1.b-note-he" guid="_1e3f8b2d-bdf5-4706-ad13-db81601214dc">Example for paragraph (b)—</heading><block status="uncommenced"><txt break.before="1">the owner of the thing has migrated to another country</txt></block></note></block></li></list></block></subclause><subclause id="sec.212-ssec.3" guid="_397edca3-d622-4b64-83d0-308c8e1579f6" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The inspector must consider the thing’s condition, nature and value when deciding—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.212-ssec.3-para1.a" guid="_814038ac-8741-4328-aa7f-d0c6c59b170d" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">whether it is reasonable to make inquiries or efforts; and</txt></block></li><li id="sec.212-ssec.3-para1.b" guid="_bd2f127d-cce9-445d-8cf1-7c9f8bb8ef10" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if inquiries or efforts are made—what inquiries or efforts, including the period over which they are made, are reasonable.</txt></block></li></list></block></subclause><subclause id="sec.212-ssec.4" guid="_9c6ad81c-96ee-462a-bf80-4ed072841b70" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">If the chief executive decides to forfeit a thing, the chief executive must as soon as practicable give a decision notice about the decision to a person (the <defterm id="sec.212-def.formerowner" guid="_e1d5d054-18e4-4566-aa31-6588e6e5be8e" type="definition">former owner</defterm>) who owned the thing immediately before the thing was forfeited.</txt></block></subclause><subclause id="sec.212-ssec.5" guid="_7139ca8f-8604-4a4d-b7ef-b7dca0da264a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">If the decision was made under subsection (1)(a) or (b), the decision notice may be given by leaving the notice at the place where the thing was seized, in a conspicuous position and in a reasonably secure way.</txt></block></subclause><subclause id="sec.212-ssec.6" guid="_2e71622a-7562-4e7d-b8af-f1053e4bb216" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">The decision notice must state that the former owner may apply for a stay of the decision if the former owner appeals against the decision.</txt></block></subclause><subclause id="sec.212-ssec.7" guid="_46bdaf93-2140-4c2c-aedb-fab17d6dc7a0" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">However, subsections (4) to (6) do not apply if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.212-ssec.7-para1.a" guid="_bd932543-4075-4102-aa28-da48ec851dac" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the decision was made under subsection (1)(a) or (b); and</txt></block></li><li id="sec.212-ssec.7-para1.b" guid="_12e49893-30f2-4c76-b351-2caceb737c77" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the place where the thing was seized is—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.212-ssec.7-para1.b-para2.i" guid="_935f0f07-4135-4ede-90d6-399c3f2d0f09" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a public place; or</txt></block></li><li id="sec.212-ssec.7-para1.b-para2.ii" guid="_859d4f1c-55cc-4d74-8998-8c003c88f354" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">a place where the notice is unlikely to be read by the former owner.</txt></block></li></list></block></li></list></block></subclause></clause><clause id="sec.213" guid="_4a3082bb-62cd-47fb-a4e5-1daa10754bb6" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>213</no><heading id="sec.213-he" guid="_51b50c4a-f7e3-46b6-b9c5-d320401a0e83">Dealing with things forfeited or transferred to State</heading><subclause id="sec.213-ssec.1" guid="_89a6c8c1-b452-4a56-b874-881c052456ba" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A thing becomes the property of the State if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.213-ssec.1-para1.a" guid="_4b5b91fb-f14d-4d63-b943-bf39a19d1949" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the thing is forfeited to the State under section 212(1); or</txt></block></li><li id="sec.213-ssec.1-para1.b" guid="_dcd996b0-36ed-4eb3-8d57-ad16e3846156" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the owner of the thing and the State agree, in writing, to the transfer of the ownership of the thing to the State.</txt></block></li></list></block></subclause><subclause id="sec.213-ssec.2" guid="_856a71f5-79b9-43e0-b25e-2b1b996a13a1" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The chief executive may deal with the thing as the chief executive considers appropriate (by destroying the thing or giving it away, for example).</txt></block></subclause><subclause id="sec.213-ssec.3" guid="_ea5967af-4fc4-49f7-9fc4-8b179d380a38" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The chief executive must not deal with the thing in a way that could prejudice the outcome of an appeal against the forfeiture.</txt></block></subclause><subclause id="sec.213-ssec.4" guid="_ed2cd648-6c4e-4ea5-9dfc-04b884bbe7b8" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">If the chief executive sells the thing, the chief executive may, after deducting the costs of the sale, return the proceeds of the sale to the former owner of the thing.</txt></block></subclause><subclause id="sec.213-ssec.5" guid="_e059262e-1c58-428a-8301-c35edf7b11b9" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">This section is subject to a disposal order made for the thing.</txt></block></subclause></clause></subdivision></division><division id="ch.5-pt.8-div.3" guid="_729325c8-6374-4b2b-b813-1ed58126b5ab" status="uncommenced" affected.by.uncommenced="0"><no>Division 3</no><heading id="ch.5-pt.8-div.3-he" guid="_290bb6ee-681d-4a1a-a6d3-0d0670ed2eb8">Disposal orders</heading><clause id="sec.214" guid="_542a762c-0ef5-46e1-a289-2a532ab13034" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>214</no><heading id="sec.214-he" guid="_79043543-846c-486b-8f50-8f7e3e22f9bb">Disposal order</heading><subclause id="sec.214-ssec.1" guid="_b8e6b3fe-b94c-41c1-b807-b5194a2def21" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if a court convicts a person of an offence against this Act.</txt></block></subclause><subclause id="sec.214-ssec.2" guid="_a9cb227f-2765-4f61-b276-fc422a109c05" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The court may make an order (a <defterm id="sec.214-def.disposalorder" guid="_faab605f-262e-4daf-99f8-191705136d71" type="definition">disposal order</defterm>), on its own initiative or on an application by the prosecution, for the disposal of any of the following things owned by the person—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.214-ssec.2-para1.a" guid="_1685f8fe-f8ae-4fd8-8c05-9ed3745f794e" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">anything that was the subject of, or used to commit, the offence;</txt></block></li><li id="sec.214-ssec.2-para1.b" guid="_62cfe94e-f90b-4614-bd07-acd342431c42" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">another thing the court considers is likely to be used by the person or another person in committing a further offence against this Act.</txt></block></li></list></block></subclause><subclause id="sec.214-ssec.3" guid="_a045c695-0f73-4bc6-bc89-b72aa2e7503e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The court may make a disposal order for a thing—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.214-ssec.3-para1.a" guid="_5ce92eee-7eb4-496c-a6ca-211220efe7b4" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">whether or not it has been seized under this Act; and</txt></block></li><li id="sec.214-ssec.3-para1.b" guid="_4b44167f-678f-4720-afca-db5032262238" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the thing has been seized—whether or not it has been returned to the former owner.</txt></block></li></list></block></subclause><subclause id="sec.214-ssec.4" guid="_071810c6-a39a-4cdc-a4e4-065c302fdd87" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">When deciding whether to make a disposal order for a thing, the court—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.214-ssec.4-para1.a" guid="_da838fdb-dddc-4f1c-960a-713a559664a4" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">may require notice to be given to anyone the court considers appropriate, including, for example, any person who may have property in the thing; and</txt></block></li><li id="sec.214-ssec.4-para1.b" guid="_1033b9b0-7628-4535-9997-e9cd23f44307" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">must hear any submission that a person claiming to have property in the thing may wish to make.</txt></block></li></list></block></subclause><subclause id="sec.214-ssec.5" guid="_cf36c162-38c2-47c6-a3a9-17181c96a44d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The court may make any order to enforce the disposal order that it considers appropriate.</txt></block></subclause><subclause id="sec.214-ssec.6" guid="_525334b1-d385-44b3-9732-78a22691bf96" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">This section does not limit the court’s powers under another law.</txt></block></subclause></clause></division><division id="ch.5-pt.8-div.4" guid="_3a90c8e9-6c5a-4af2-a52a-e1e4a8714dcb" status="uncommenced" affected.by.uncommenced="0"><no>Division 4</no><heading id="ch.5-pt.8-div.4-he" guid="_c7ea892d-c545-4e7c-82d1-8c2395c6e961">Other information-obtaining powers of inspectors</heading><clause id="sec.215" guid="_cabadba3-0ae9-4acf-b53f-77a93f5aeade" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>215</no><heading id="sec.215-he" guid="_6d4fc8f0-5333-4388-94d3-4b6fe531323d">Requiring name and address</heading><subclause id="sec.215-ssec.1" guid="_46e32f8b-a20e-4f78-9dcb-3dd01eb1605e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if an inspector—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.215-ssec.1-para1.a" guid="_6fc424d6-468e-4de0-9bc2-9e5b861308e5" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">finds a person committing an offence against this Act; or</txt></block></li><li id="sec.215-ssec.1-para1.b" guid="_4b3f14ee-3eab-43ab-911d-fd9c78974894" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">finds a person in circumstances that lead the inspector to reasonably suspect the person has just committed an offence against this Act; or</txt></block></li><li id="sec.215-ssec.1-para1.c" guid="_e1140efc-324c-442e-b11d-98b503ec16e4" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">has information that leads the inspector to reasonably suspect a person has just committed an offence against this Act.</txt></block></li></list></block></subclause><subclause id="sec.215-ssec.2" guid="_07498228-57b0-44e0-a9a7-ad1b3a226b16" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The inspector may require the person to state the person’s name and residential address.</txt></block></subclause><subclause id="sec.215-ssec.3" guid="_87c3a667-4530-4f36-a2c1-bafc00c3badb" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">Also, the inspector may require the person to give evidence of the correctness of the stated name or address if, in the circumstances, it would be reasonable to expect the person to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.215-ssec.3-para1.a" guid="_f3314993-0128-4652-9417-e4313b4b562d" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">be in possession of evidence of the correctness of the stated name or address; or</txt></block></li><li id="sec.215-ssec.3-para1.b" guid="_d1829f0c-0eb0-496d-8c0f-7b1685568433" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">otherwise be able to give the evidence.</txt></block></li></list></block></subclause><subclause id="sec.215-ssec.4" guid="_38e73367-fb06-45a8-a4f0-3e5e3d936a2c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">When making a requirement, the inspector must give an offence warning to the person.</txt></block></subclause><subclause id="sec.215-ssec.5" guid="_4d7ccf22-9901-4987-919f-c7a3179197b9" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The person must comply with the requirement, unless the person has a reasonable excuse.</txt><penalty id="sec.215-ssec.5-pen" guid="_828279d6-3a8b-4a2f-b460-33a0c34a5626"><block status="uncommenced"><txt break.before="1">Maximum penalty—40 penalty units.</txt></block></penalty></block></subclause><subclause id="sec.215-ssec.6" guid="_aab4576d-1fb9-4431-a79b-85ad4b392094" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">The person may not be convicted of an offence under subsection (5) unless the person is found guilty of the offence in relation to which the requirement was made.</txt></block></subclause></clause><clause id="sec.216" guid="_71dc7272-279e-4789-a5d8-f18e2536b3aa" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>216</no><heading id="sec.216-he" guid="_a4a0b752-f6ff-4332-bec5-6ff8ce9a54f3">Requiring documents to be produced</heading><subclause id="sec.216-ssec.1" guid="_30a1e2f5-1511-45a7-84d7-a141a96bf2cd" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.216-ssec.1-para1.a" guid="_cec593bd-669a-4a58-8575-7cd31e91427c" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a document issued to a person under this Act; and</txt></block></li><li id="sec.216-ssec.1-para1.b" guid="_02084212-e781-4e79-9d06-2ccea73a4850" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a document required to be kept by a person under this Act.</txt></block></li></list></block></subclause><subclause id="sec.216-ssec.2" guid="_58c0f9cc-e97b-49c1-90f6-7ad15521ebdc" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">An inspector may require the person to produce the document to an inspector for inspection, at a reasonable time and place that the inspector nominates.</txt></block></subclause><subclause id="sec.216-ssec.3" guid="_711ea51b-21ec-4234-9e4a-22a2113f4904" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The person must comply with the requirement, unless the person has a reasonable excuse.</txt><penalty id="sec.216-ssec.3-pen" guid="_4f84b052-0353-4230-a9d1-011ecd6aef54"><block status="uncommenced"><txt break.before="1">Maximum penalty—40 penalty units.</txt></block></penalty></block></subclause><subclause id="sec.216-ssec.4" guid="_c028397f-bb8f-439b-a363-5946c7048ca4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">It is not a reasonable excuse for the person to fail to comply with the requirement on the basis that complying with the requirement might tend to incriminate the person or expose the person to a penalty.</txt><note id="sec.216-ssec.4-note" guid="_9cd90e67-39ab-40f4-b427-e8a699e5f9a1" type="example"><heading id="sec.216-ssec.4-note-he" guid="_c55fd90f-4727-4cf3-acd1-c772d531f649">Note—</heading><block status="uncommenced"><txt break.before="1">However, see section 224 (which is about evidential immunity).</txt></block></note></block></subclause><subclause id="sec.216-ssec.5" guid="_4eeba562-024a-468f-9f52-1b7abf7b0081" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The inspector must inform the person, in a way that is reasonable in the circumstances—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.216-ssec.5-para1.a" guid="_310d79ca-9c62-4b0d-bc4a-72783fd58595" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">that the person must comply with the requirement even though complying might tend to incriminate the person or expose the person to a penalty; and</txt></block></li><li id="sec.216-ssec.5-para1.b" guid="_b3fbe2e6-195f-4373-bb46-4acad9d8e7b4" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">that, under section 224, there is a limited immunity against the future use of the information or document given in compliance with the requirement.</txt></block></li></list></block></subclause><subclause id="sec.216-ssec.6" guid="_084ff655-7a23-4a79-8782-004166ed358f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">If the inspector fails to comply with subsection (5), the person can not be convicted of the offence against subsection (3).</txt></block></subclause><subclause id="sec.216-ssec.7" guid="_90ed7418-74f7-45b2-b077-f4384224ad35" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">If a court convicts a person of an offence against subsection (3), the court may, as well as imposing a penalty for the offence, order the person to comply with the requirement.</txt></block></subclause><subclause id="sec.216-ssec.8" guid="_e579de25-128e-4def-8df9-67d7bde2e098" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(8)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.216-ssec.8-def.produce_" guid="_a5aa970f-fe19-4cb6-9705-2a30cd9bb56b" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.216-ssec.8-def.produce" guid="_e80cf07d-92f4-4db0-b1d7-9a8f660516a1" type="definition">produce</defterm>, a document that is an electronic document, means produce a clear written reproduction of the document.</txt></definition></deflist></block></subclause></clause><clause id="sec.217" guid="_6801ea75-744b-4a37-81ce-430a32e4c85c" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>217</no><heading id="sec.217-he" guid="_212b0dfc-7ebf-44cb-99ba-3d30f614e2f3">Requiring documents to be certified</heading><subclause id="sec.217-ssec.1" guid="_5caaf06e-acb1-4c00-950c-56db3ce37d2b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to a document produced under section 216 to an inspector.</txt></block></subclause><subclause id="sec.217-ssec.2" guid="_8e2514d7-eb4b-4444-adfd-af3bbefeeb6c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The inspector may keep the document to copy the document.</txt></block></subclause><subclause id="sec.217-ssec.3" guid="_f37a6432-3556-42ee-8214-c0063772f4c6" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">If the inspector copies the document, or an entry in the document, the inspector may require the person responsible for keeping the document to certify the copy as a true copy of the document or entry.</txt></block></subclause><subclause id="sec.217-ssec.4" guid="_7a71aa92-5f2d-4553-8fc2-785af59f43df" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The inspector must return the document to the person as soon as practicable after copying the document.</txt></block></subclause><subclause id="sec.217-ssec.5" guid="_55702e51-77de-4950-9878-f402c7fde776" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">However, if the inspector makes a requirement of the person under subsection (3), the inspector may keep the document until the person complies with the requirement.</txt></block></subclause><subclause id="sec.217-ssec.6" guid="_dedf89ea-1cf7-45ba-a954-d960a52cd4b1" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">The person must comply with the requirement, unless the person has a reasonable excuse.</txt><penalty id="sec.217-ssec.6-pen" guid="_76cb7452-7394-434f-8c94-2d3b15f20063"><block status="uncommenced"><txt break.before="1">Maximum penalty—40 penalty units.</txt></block></penalty></block></subclause><subclause id="sec.217-ssec.7" guid="_51e6deb4-2941-499d-8c30-5fcde9853bb1" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">It is not a reasonable excuse for the person to fail to comply with the requirement on the basis that complying with the requirement might tend to incriminate the person or expose the person to a penalty.</txt></block><note id="sec.217-ssec.7-note" guid="_a6cd2d9b-96f2-4856-972c-1f022c997577" type="example"><heading id="sec.217-ssec.7-note-he" guid="_d19131e1-80c4-440f-bcf8-42eda667ef31">Note—</heading><block status="uncommenced"><txt break.before="1">However, see section 224 (which is about evidential immunity).</txt></block></note></subclause><subclause id="sec.217-ssec.8" guid="_6a8289b6-aee7-4a7c-b847-b0620aa71aef" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(8)</no><block status="uncommenced"><txt break.before="1">The inspector must inform the person, in a way that is reasonable in the circumstances—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.217-ssec.8-para1.a" guid="_3ecbfae2-a98a-4b50-86c3-ff6b5d571c6c" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">that the person must comply with the requirement even though complying might tend to incriminate the person or expose the person to a penalty; and</txt></block></li><li id="sec.217-ssec.8-para1.b" guid="_bdd5ccc4-12ec-457f-bbcc-f543cbecb4ec" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">that, under section 224, there is a limited immunity against the future use of the information or document given in compliance with the requirement.</txt></block></li></list></block></subclause><subclause id="sec.217-ssec.9" guid="_ae88c667-4b45-4279-a4d9-caea2fb2b11e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(9)</no><block status="uncommenced"><txt break.before="1">If the person fails to comply with subsection (6), but the inspector fails to comply with subsection (8), the person can not be convicted of the offence against subsection (6).</txt></block></subclause></clause><clause id="sec.218" guid="_27e7f5ec-128f-4db0-b727-bb2c79d0591e" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>218</no><heading id="sec.218-he" guid="_f074955b-08ea-4142-82c2-56a6def96f8d">Requiring information</heading><subclause id="sec.218-ssec.1" guid="_a73519dc-8ada-437f-9505-bc4f5435031b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if an inspector reasonably believes—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.218-ssec.1-para1.a" guid="_767fdfb9-31b6-4263-9f90-55d6e0f83a86" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">an offence against this Act has been committed; and</txt></block></li><li id="sec.218-ssec.1-para1.b" guid="_f685a859-777b-4964-be7f-3f9cd791ba52" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a person may be able to give information about the offence.</txt></block></li></list></block></subclause><subclause id="sec.218-ssec.2" guid="_d79fcd68-9174-4ff2-9640-04f0d3940d2f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The inspector may, by notice given to the person, require the person to give information about the offence to the inspector, at a stated reasonable time and place.</txt></block></subclause><subclause id="sec.218-ssec.3" guid="_1013ce5e-0605-46b6-9c1b-9bff82c4759c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The person must comply with the requirement, unless the person has a reasonable excuse.</txt><penalty id="sec.218-ssec.3-pen" guid="_e07263a4-d44e-4882-83ad-d1d45cc7ab4a"><block status="uncommenced"><txt break.before="1">Maximum penalty—40 penalty units.</txt></block></penalty></block></subclause><subclause id="sec.218-ssec.4" guid="_43ee9a99-83c0-48b1-bdf6-4606ddb2b208" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">It is a reasonable excuse for an individual not to give the information if giving the information might tend to incriminate the individual or expose the individual to a penalty.</txt></block></subclause><subclause id="sec.218-ssec.5" guid="_993b8471-5b0d-4a9c-b398-c48dd8e1e0f7" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.218-ssec.5-def.give_" guid="_76312ca3-6ab5-4a78-b72e-ee2ddd2dc98a" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.218-ssec.5-def.give" guid="_44ee7d66-3675-491f-8e81-6e929e550986" type="definition">give</defterm>, information that is stored as an electronic document, means produce a clear written reproduction of the information.</txt></definition></deflist></block></subclause></clause></division><division id="ch.5-pt.8-div.5" guid="_8c7ac185-19f3-42a2-af1a-ca3a1c4b20e4" status="uncommenced" affected.by.uncommenced="0"><no>Division 5</no><heading id="ch.5-pt.8-div.5-he" guid="_76d241b2-ddcf-49b2-8a75-f4fa45f73611">Damage</heading><clause id="sec.219" guid="_673700cd-ae9e-4e6a-b341-2a89fc701ae2" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>219</no><heading id="sec.219-he" guid="_2cfe613c-7cae-4e39-849c-a94e2b175d7b">Duty to avoid inconvenience and minimise damage</heading><block status="uncommenced"><txt break.before="1">When exercising a power, an inspector must take all reasonable steps to cause as little inconvenience, and do as little damage, as possible.</txt><note id="sec.219-note" guid="_3318487b-a07d-430d-8416-e96f0ed2821e" type="example"><heading id="sec.219-note-he" guid="_27bb1800-8f09-43f4-a6b2-a2089c003542">Note—</heading><block status="uncommenced"><txt break.before="1">Also, see section 221 (which is about compensation).</txt></block></note></block></clause><clause id="sec.220" guid="_48df29aa-c04c-4b27-bca5-606ec4522099" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>220</no><heading id="sec.220-he" guid="_2faa9138-44f7-45c3-a964-1c594882da2c">Notice of damage</heading><subclause id="sec.220-ssec.1" guid="_401532df-6785-4ca7-bba7-6b2b7451c221" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.220-ssec.1-para1.a" guid="_f768ad91-1bcf-45f5-a555-c42622dd6f02" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">an inspector damages something when exercising, or purporting to exercise, a power; or</txt></block></li><li id="sec.220-ssec.1-para1.b" guid="_0991e098-5818-4f9a-a227-b3b4bfc9cb89" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a person (the <defterm id="sec.220-ssec.1-def.assistant" guid="_4761ff3d-49ab-4d43-b981-ff2b6fcf05c9" type="definition">assistant</defterm>) acting under the direction or authority of an inspector damages something.</txt></block></li></list></block></subclause><subclause id="sec.220-ssec.2" guid="_0a7dfb0f-bf22-4209-a3d7-f827d3110e34" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, this section does not apply to damage the inspector reasonably considers is trivial or if the inspector reasonably believes—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.220-ssec.2-para1.a" guid="_292ba108-cd37-45eb-aafd-63ebfbdb223b" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">there is no-one apparently in possession of the thing; or</txt></block></li><li id="sec.220-ssec.2-para1.b" guid="_d5ad42d1-cf96-4b2b-8642-f34e6a125629" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the thing has been abandoned.</txt></block></li></list></block></subclause><subclause id="sec.220-ssec.3" guid="_9bebd22a-b3b7-40d7-a45f-c0ac714493f1" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The inspector must give notice of the damage to a person who appears to the inspector to be an owner, or person in control, of the thing.</txt></block></subclause><subclause id="sec.220-ssec.4" guid="_f24c2c6f-4b87-46cc-ab4e-e944f4aefc72" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">However, if for any reason it is not practicable to comply with subsection (3), the inspector must—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.220-ssec.4-para1.a" guid="_17a98017-b94d-42df-a0b5-818e39dee179" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">leave the notice at the place where the damage happened; and</txt></block></li><li id="sec.220-ssec.4-para1.b" guid="_a618b522-fbde-4938-91d1-8d1e29c65f2d" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">ensure it is left in a conspicuous position and in a reasonably secure way.</txt></block></li></list></block></subclause><subclause id="sec.220-ssec.5" guid="_462fae75-1a5b-4f92-ab9e-afbe3e78c873" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The inspector may delay complying with subsection (3) or (4) if the inspector reasonably suspects complying with the subsection may frustrate or otherwise hinder an investigation by the inspector.</txt></block></subclause><subclause id="sec.220-ssec.6" guid="_572267b5-3804-4020-a881-f7184cd07169" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">The delay may be only for so long as the inspector continues to have the reasonable suspicion and remains in the vicinity of the place.</txt></block></subclause><subclause id="sec.220-ssec.7" guid="_b97391ff-34ab-4e6e-939d-602a7946da63" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">If the inspector believes the damage was caused by a latent defect in the thing or other circumstances beyond the control of the inspector or the assistant, the inspector may state the belief in the notice.</txt></block></subclause><subclause id="sec.220-ssec.8" guid="_d3031c17-5be5-48b0-8559-25bb39f6fc5a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(8)</no><block status="uncommenced"><txt break.before="1">The notice must state—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.220-ssec.8-para1.a" guid="_1c88e7f1-4c03-4709-a336-6bcef3d9429e" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">particulars of the damage; and</txt></block></li><li id="sec.220-ssec.8-para1.b" guid="_6da2d42b-4a53-4669-a8ed-ced50e4876dd" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">that the person who suffered the damage may claim compensation under section 221.</txt></block></li></list></block></subclause></clause></division><division id="ch.5-pt.8-div.6" guid="_8706c033-33be-44b4-a475-ba9a7e94d68d" status="uncommenced" affected.by.uncommenced="0"><no>Division 6</no><heading id="ch.5-pt.8-div.6-he" guid="_0d9eb946-4a22-4c58-84df-412dd092ef44">Compensation for loss</heading><clause id="sec.221" guid="_f79b4beb-768f-427f-8ab9-077240219ccc" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>221</no><heading id="sec.221-he" guid="_b6cb6960-ba13-460b-8484-b37b9163dfe3">Compensation for loss</heading><subclause id="sec.221-ssec.1" guid="_6ff220e5-340f-4fd8-bc47-dfcf0f343582" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A person may claim compensation from the State if the person incurs loss because of the exercise, or purported exercise, of a power by or for an inspector, including a loss arising from compliance with a requirement made of the person under division 2, 3 or 4.</txt></block></subclause><subclause id="sec.221-ssec.2" guid="_a1719ca5-d600-43c5-baee-5470c47c4f71" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The compensation may be claimed and ordered in a proceeding—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.221-ssec.2-para1.a" guid="_5ec9ea3e-bed5-439f-9308-b045cb562753" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">brought in a court with jurisdiction for the recovery of the amount of compensation claimed; or</txt></block></li><li id="sec.221-ssec.2-para1.b" guid="_c9a8bce9-3f94-4b07-91ed-74d58f26a107" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for an alleged offence against this Act, the investigation of which gave rise to the claim for compensation.</txt></block></li></list></block></subclause><subclause id="sec.221-ssec.3" guid="_09e7136b-c2ba-4716-a892-78a9b27a6a4c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">A court may order the payment of compensation only if it is satisfied it is just to make the order in the circumstances.</txt></block></subclause><subclause id="sec.221-ssec.4" guid="_4b4952f5-2f19-4d23-baee-401686f3d94c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">When considering whether it is just to order compensation, the court must consider—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.221-ssec.4-para1.a" guid="_beb882ee-a3e9-488c-b644-a12f0c286b98" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">any relevant offence committed by the claimant; and</txt></block></li><li id="sec.221-ssec.4-para1.b" guid="_8ad27c86-d501-433f-bf12-f0611d7546e3" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">whether the loss arose from a lawful seizure or lawful forfeiture.</txt></block></li></list></block></subclause><subclause id="sec.221-ssec.5" guid="_f61fe8b8-1256-4008-a557-116f2c391568" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">A regulation may prescribe other matters that may, or must, be taken into account by the court when considering whether it is just to order compensation.</txt></block></subclause><subclause id="sec.221-ssec.6" guid="_f4409f30-d276-4d1f-84d2-f2fb7b28fdba" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">Section 219 does not provide for a statutory right of compensation other than is provided by this section.</txt></block></subclause><subclause id="sec.221-ssec.7" guid="_449c07a8-cf9d-4ea2-b4ed-397c71dc8726" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.221-ssec.7-def.loss_" guid="_33849f15-72f0-43bc-84e6-6ab59d6f3ee6" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.221-ssec.7-def.loss" guid="_f0958ebb-120e-4782-a0fa-d1cf853355c1" type="definition">loss</defterm> includes costs and damage.</txt></definition></deflist></block></subclause></clause></division><division id="ch.5-pt.8-div.7" guid="_e842d517-c4a1-4176-adc9-c394adc842cb" status="uncommenced" affected.by.uncommenced="0"><no>Division 7</no><heading id="ch.5-pt.8-div.7-he" guid="_49f2d626-6722-41d6-9ed9-fe57f949724a">Other offences relating to inspectors</heading><clause id="sec.222" guid="_f10f166f-865b-4ecd-8c70-123f6b6e1ddc" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>222</no><heading id="sec.222-he" guid="_067dda10-8c37-4798-9bd9-dee31ac980fc">Obstructing inspector</heading><subclause id="sec.222-ssec.1" guid="_31370325-be38-4cd7-b1ff-e1b2b0b66644" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A person must not obstruct an inspector exercising a power, or someone helping an inspector exercising a power, unless the person has a reasonable excuse.</txt><penalty id="sec.222-ssec.1-pen" guid="_98ae4b4f-3e79-42fb-a1b5-076b4dfc0adf"><block status="uncommenced"><txt break.before="1">Maximum penalty—60 penalty units.</txt></block></penalty></block></subclause><subclause id="sec.222-ssec.2" guid="_9b7737de-11b9-46cd-a11b-392915e6ead4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">If a person has obstructed an inspector, or someone helping an inspector, and the inspector decides to proceed with the exercise of the power, the inspector must warn the person that—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.222-ssec.2-para1.a" guid="_f992af45-60c8-4cfe-ba84-4132b860b3fd" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">it is an offence to cause an obstruction, unless the person has a reasonable excuse; and</txt></block></li><li id="sec.222-ssec.2-para1.b" guid="_5baca284-ff24-4f52-94de-8061ce3405b7" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the inspector considers the person’s conduct an obstruction.</txt></block></li></list></block></subclause><subclause id="sec.222-ssec.3" guid="_b47e8f68-aef5-4f21-88c0-acdd54394084" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.222-ssec.3-def.obstruct_" guid="_8fea469c-b6f0-4066-8bf6-d714424f7f72" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.222-ssec.3-def.obstruct" guid="_5aef1c08-f829-48d6-8420-f4a54f6ccdcb" type="definition">obstruct</defterm> includes assault, hinder, resist, attempt to obstruct and threaten to obstruct.</txt></definition></deflist></block></subclause></clause><clause id="sec.223" guid="_62dcc8ca-bf92-4ad2-873b-9cf002985135" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>223</no><heading id="sec.223-he" guid="_3d8b59b1-1844-4188-8e36-c88bfac33083">Impersonating inspector</heading><block status="uncommenced"><txt break.before="1">A person must not impersonate an inspector.</txt><penalty id="sec.223-pen" guid="_95564297-3c1e-4682-aa42-e801d62ee33b"><block status="uncommenced"><txt break.before="1">Maximum penalty—60 penalty units.</txt></block></penalty></block></clause></division><division id="ch.5-pt.8-div.8" guid="_31cb778e-71c3-4421-9009-262b2e59a1d9" status="uncommenced" affected.by.uncommenced="0"><no>Division 8</no><heading id="ch.5-pt.8-div.8-he" guid="_e706d0e6-a2eb-4d41-b0ce-33d23c0078fe">Other provisions</heading><clause id="sec.224" guid="_a5a06fef-dca4-4dc3-8cef-04b793bf6035" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>224</no><heading id="sec.224-he" guid="_dd241590-fd4e-4cd7-bf5e-734782c09b9f">Evidential immunity</heading><subclause id="sec.224-ssec.1" guid="_bec14ed4-539e-4318-bfca-01bfe59b8c48" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if an individual gives or produces information or a document to an inspector under section 199 or 216.</txt></block></subclause><subclause id="sec.224-ssec.2" guid="_b94db46b-0d55-42bb-b6bc-33ff7be95157" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">Evidence of the information or document, and other evidence directly or indirectly derived from the information or document, is not admissible against the individual in a proceeding to the extent it tends to incriminate the individual, or expose the individual to a penalty, in the proceeding.</txt></block></subclause><subclause id="sec.224-ssec.3" guid="_baf3a77a-02d4-4ad3-be98-39232bfd388e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">However, this section does not apply to a proceeding about the false or misleading nature of the information or anything in the document or in which the false or misleading nature of the information or document is relevant evidence.</txt></block></subclause></clause></division></part><part id="ch.5-pt.9" guid="_ba773a90-54e9-4b89-aae8-16bb83f3293b" status="uncommenced" affected.by.uncommenced="0"><no>Part 9</no><heading id="ch.5-pt.9-he" guid="_21ad23eb-b22a-49fa-9e9a-16893f90669b">Miscellaneous</heading><clause id="sec.225" guid="_0407a4d0-a74d-423e-a0ba-0bb853d72f72" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>225</no><heading id="sec.225-he" guid="_f63a8a13-2604-4457-bb47-1e64e7e52528">Application of other Acts</heading><subclause id="sec.225-ssec.1" guid="_92c757e2-4b19-4aea-9dd1-667800e69ecb" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">If another Act—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.225-ssec.1-para1.a" guid="_13a8940d-5249-49fa-9c1e-b455fdd9f92d" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">specifies monetary penalties for offences about development greater or less than the penalties specified in this Act; or</txt></block></li><li id="sec.225-ssec.1-para1.b" guid="_84026358-8977-4213-95a8-40e8a130c312" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">provides that an activity specified in this Act as a development offence is not an offence; or</txt></block></li><li id="sec.225-ssec.1-para1.c" guid="_095e0ea9-8561-4846-b160-63b54842f0f0" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">contains provisions about the carrying out of development in an emergency; or</txt></block></li><li id="sec.225-ssec.1-para1.d" guid="_cd0d82a2-f79c-42f0-a8e0-0af9e0c22fb3" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">includes requirements about show cause notices or enforcement notices that are different from the requirements of this Act; or</txt></block></li><li id="sec.225-ssec.1-para1.e" guid="_4bc8a7cb-365c-499e-8c40-248b2b507019" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">includes provisions about the issuing of other notices having the same effect as show cause notices or enforcement notices; or</txt></block></li><li id="sec.225-ssec.1-para1.f" guid="_8c48d449-7e2b-47dc-a870-973917d187dd" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">includes requirements about proceedings for the prosecution for development offences or other offences that are different from the requirements of this Act; or</txt></block></li><li id="sec.225-ssec.1-para1.g" guid="_0bd6d5ff-3f44-43bc-b294-af14f785251f" status="uncommenced" provision.type="other"><no>(g)</no><block status="uncommenced"><txt break.before="1">includes requirements about proceedings for enforcement orders that are different to the requirements of this Act;</txt></block></li></list><txt break.before="1">the provisions of the other Act apply instead of the provisions of this Act to the extent of any inconsistency.</txt></block></subclause><subclause id="sec.225-ssec.2" guid="_ff99af60-02f2-43e7-a896-494c98831796" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The chief executive’s nomination of a person as an inspector or enforcement authority does not prevent the person performing functions of an investigative or enforcement nature that the person has under another Act.</txt></block></subclause><subclause id="sec.225-ssec.3" guid="_c5cec6a0-6401-49b7-9120-ebf82a8bc846" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">This chapter does not limit a court’s powers under the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Penalties and Sentences Act 1992</name></legref> or another law.</txt></block></subclause></clause><clause id="sec.226" guid="_47cdc579-acb8-450c-822d-8d6e20bcdd30" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>226</no><heading id="sec.226-he" guid="_1e30eef5-2349-4364-819a-cb195e87c2f9">False or misleading information</heading><subclause id="sec.226-ssec.1" guid="_3185f400-56d1-4652-8580-b6ea2aac6fd8" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A person must not, for this Act, give an official information that the person knows is false or misleading in a material particular.</txt></block><penalty id="sec.226-ssec.1-pen" guid="_e63283da-fb17-4b60-9373-1e769a96e659"><block status="uncommenced"><txt break.before="1">Maximum penalty—4500 penalty units.</txt></block></penalty></subclause><subclause id="sec.226-ssec.2" guid="_99eb437a-cb6b-47bb-951e-ad6c39ecfffc" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">Subsection (1) does not apply if the person, when giving the information to the official—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.226-ssec.2-para1.a" guid="_96c2b4dd-00dc-411c-83e9-16fb7d9497b4" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">informs the official, to the best of the person’s ability, how the information is false or misleading; and</txt></block></li><li id="sec.226-ssec.2-para1.b" guid="_0f96fa67-7116-41bd-9fbf-21fe64a9469f" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the person has, or can reasonably get, the correct information—gives the correct information.</txt></block></li></list></block></subclause><subclause id="sec.226-ssec.3" guid="_9486501c-eea6-4b40-b164-a276a0d28ef6" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.226-ssec.3-def.official_" guid="_8efa9d07-a3ba-4104-a8ee-02d5d6862b69" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.226-ssec.3-def.official" guid="_18df831f-e364-4388-a9ed-a2528cf7628e" type="definition">official</defterm> means—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.226-ssec.3-def.official-para1.a" guid="_61c915c1-1220-44c1-b1db-203dbdf31b1f" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">an assessment manager; or</txt></block></li><li id="sec.226-ssec.3-def.official-para1.b" guid="_72e53485-9bb5-45fd-abaf-a0434f43d6bc" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a referral agency; or</txt></block></li><li id="sec.226-ssec.3-def.official-para1.c" guid="_119eec81-9f2a-4b2f-9d5d-4c4cb42ae042" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">a responsible entity for a change application; or</txt></block></li><li id="sec.226-ssec.3-def.official-para1.d" guid="_66cde5f9-0d56-496a-9ca9-a21c24b7eab9" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">an enforcement authority; or</txt></block></li><li id="sec.226-ssec.3-def.official-para1.e" guid="_eda7f56b-8556-4a20-845d-4e53cf0304c2" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">the Minister; or</txt></block></li><li id="sec.226-ssec.3-def.official-para1.f" guid="_baea1bb1-994c-4fb9-8e73-cb237268f023" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">the chief executive; or</txt></block></li><li id="sec.226-ssec.3-def.official-para1.g" guid="_04215460-37e3-4c34-8b8c-8fe4ffb8b23c" status="uncommenced" provision.type="other"><no>(g)</no><block status="uncommenced"><txt break.before="1">a local government; or</txt></block></li><li id="sec.226-ssec.3-def.official-para1.h" guid="_9c970c58-2aaf-4a0d-99b1-33dba9995ddf" status="uncommenced" provision.type="other"><no>(h)</no><block status="uncommenced"><txt break.before="1">an inspector; or</txt></block></li><li id="sec.226-ssec.3-def.official-para1.i" guid="_4d930cf7-f2f9-4f54-a145-5ad151bdafe4" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">another person prescribed by regulation.</txt></block></li></list></definition></deflist></block></subclause></clause><clause id="sec.227" guid="_df7d4335-88e4-44a1-9102-8b6e8941d33a" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>227</no><heading id="sec.227-he" guid="_45d15708-625c-4686-90d0-b0b930781f36">Executive officer must ensure corporation complies with Act</heading><subclause id="sec.227-ssec.1" guid="_581f9ef6-0bd5-4025-afc9-36a9a88a3405" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">An executive officer of a corporation commits an offence if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.227-ssec.1-para1.a" guid="_a201e597-fc41-41e6-8615-f6b2a7bc89f6" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the corporation commits an offence against an executive liability provision; and</txt></block></li><li id="sec.227-ssec.1-para1.b" guid="_d15ca6a8-a8e1-4cf4-bc75-a76cfbc0d060" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the officer did not take all reasonable steps to ensure the corporation did not engage in the conduct constituting the offence.</txt></block></li></list><penalty id="sec.227-ssec.1-pen" guid="_ad563d7c-c13d-4b5a-b84e-48582fa6759a"><block status="uncommenced"><txt break.before="1">Maximum penalty—the penalty for a contravention of the executive liability provisions by an individual.</txt></block></penalty></block></subclause><subclause id="sec.227-ssec.2" guid="_a8ec8ea0-cd8d-454b-aa60-87256ab6aa06" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">When deciding whether things done or omitted to be done by the executive officer constitute reasonable steps for subsection (1)(b), a court must consider—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.227-ssec.2-para1.a" guid="_507cd4c0-3271-4b93-a66a-0f9ce7e15779" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">whether the officer knew, or ought reasonably to have known, of the corporation’s conduct constituting the offence against the executive liability provision; and</txt></block></li><li id="sec.227-ssec.2-para1.b" guid="_313309ac-7e35-407e-bc44-69403fc38caf" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">whether the officer was in a position to influence the corporation’s conduct in relation to the offence against the executive liability provision; and</txt></block></li><li id="sec.227-ssec.2-para1.c" guid="_255b8b9c-ace1-4434-b30e-e03e0b4abecd" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">any other matter that the court considers relevant.</txt></block></li></list></block></subclause><subclause id="sec.227-ssec.3" guid="_29878ca0-c880-449b-9ce0-7df9143bf841" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The executive officer may be proceeded against for, and convicted of, an offence against subsection (1) whether or not the corporation has been proceeded against for, or convicted of, the offence against the executive liability provision.</txt></block></subclause><subclause id="sec.227-ssec.4" guid="_b1c83c8e-27bc-4e72-9082-c11ed13e1d4a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">This section does not affect—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.227-ssec.4-para1.a" guid="_db803520-f06f-4266-bedb-55da7ffe265a" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the corporation’s liability for the offence against the executive liability provision; or</txt></block></li><li id="sec.227-ssec.4-para1.b" guid="_8411f78f-49f9-482a-a721-f3b235f6ccc0" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the liability, under the Criminal Code, chapter 2, of any person for the offence, whether or not the person is an executive officer of the corporation.</txt></block></li></list></block></subclause><subclause id="sec.227-ssec.5" guid="_ecaf9aa5-78dd-4152-a581-d37053dd6401" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.227-ssec.5-def.executiveliabilityprovision_" guid="_7f87b545-1920-410b-a74f-2542a9022afa" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.227-ssec.5-def.executiveliabilityprovision" guid="_685040fc-d70f-45eb-80e3-edc9c3ebd2fb" type="definition">executive liability provision</defterm> means—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.227-ssec.5-def.executiveliabilityprovision-para1.a" guid="_895f55e9-b7e9-419f-b41c-50213aed8280" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">section 162; or</txt></block></li><li id="sec.227-ssec.5-def.executiveliabilityprovision-para1.b" guid="_cde8acf4-e1d1-4e8a-95c3-70d1d667ce43" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">section 163; or</txt></block></li><li id="sec.227-ssec.5-def.executiveliabilityprovision-para1.c" guid="_9db9915d-a1a5-443f-869e-5bd9a3268415" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">section 164; or</txt></block></li><li id="sec.227-ssec.5-def.executiveliabilityprovision-para1.d" guid="_6f8372b5-a8f8-4257-a6dd-833ca8e5f980" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">section 165; or</txt></block></li><li id="sec.227-ssec.5-def.executiveliabilityprovision-para1.e" guid="_e99c3d16-2e2e-4229-a746-b3b0fa87fe23" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">section 166(7); or</txt></block></li><li id="sec.227-ssec.5-def.executiveliabilityprovision-para1.f" guid="_8640e438-c96b-44a6-89b7-04ffdb6bb8a2" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">section 168(5); or</txt></block></li><li id="sec.227-ssec.5-def.executiveliabilityprovision-para1.g" guid="_a4b8216c-f89e-4429-a060-c4b02eaffb29" status="uncommenced" provision.type="other"><no>(g)</no><block status="uncommenced"><txt break.before="1">section 172; or</txt></block></li><li id="sec.227-ssec.5-def.executiveliabilityprovision-para1.h" guid="_7ed82974-9138-4763-b92a-41fc97b9463d" status="uncommenced" provision.type="other"><no>(h)</no><block status="uncommenced"><txt break.before="1">section 176(5); or</txt></block></li><li id="sec.227-ssec.5-def.executiveliabilityprovision-para1.i" guid="_f9086b62-da97-4b20-b9e2-9fca732f1656" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">section 180(8).</txt></block></li></list></definition></deflist></block></subclause></clause><clause id="sec.228" guid="_cc46e445-6aa1-4307-aa3b-a877787b94a1" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>228</no><heading id="sec.228-he" guid="_ab2e45aa-123f-4a8d-86a3-88c692a0df6b">Responsibility for representative</heading><subclause id="sec.228-ssec.1" guid="_0b56be48-b4ec-4dbf-a432-42677490508e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">If it is relevant to prove, in offence proceedings, a person’s state of mind about particular conduct, it is enough to show—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.228-ssec.1-para1.a" guid="_b94c4bfc-b72b-412c-af48-b9f7e513fbdb" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the person’s representative was engaged in the conduct for the person within the scope of the representative’s actual or apparent authority; and</txt></block></li><li id="sec.228-ssec.1-para1.b" guid="_056a4ec5-37ac-4074-9a05-ec36c5be2be8" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the representative had the state of mind.</txt></block></li></list></block></subclause><subclause id="sec.228-ssec.2" guid="_1e5ad966-97e7-4494-a743-1b0680b48a20" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The person is taken to have engaged in the representative’s conduct, unless the person proves the person could not have prevented the conduct by exercising reasonable diligence.</txt></block></subclause><subclause id="sec.228-ssec.3" guid="_5353c233-82cc-4915-b386-4a89ba863a67" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.228-ssec.3-def.conduct_" guid="_cb6c8ad3-a69e-45e4-b93b-e483ee7ef877" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.228-ssec.3-def.conduct" guid="_6bee8b09-e6da-4e5a-aeec-6c218727bfa2" type="definition">conduct</defterm> means an act or omission.</txt></definition><definition id="sec.228-ssec.3-def.representative_" guid="_c78bf501-8bdc-46c0-88fb-ccc8a571078d" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.228-ssec.3-def.representative" guid="_0a61b99e-f062-455d-b485-12e5ab45a0e8" type="definition">representative</defterm> means—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.228-ssec.3-def.representative-para1.a" guid="_96d5b473-70ba-4e62-aabf-c3e0eaa54baf" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">of a corporation—an executive officer, employee or agent of the corporation; or</txt></block></li><li id="sec.228-ssec.3-def.representative-para1.b" guid="_981b5e59-3a1e-435c-8f81-ca9699828d59" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">of an individual—an employee or agent of the individual.</txt></block></li></list></definition><definition id="sec.228-ssec.3-def.stateofmind_" guid="_10317117-27f2-473c-b446-589dc6aba6f1" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.228-ssec.3-def.stateofmind" guid="_dbc0c482-b445-4a7e-b210-85fc48c9ee74" type="definition">state of mind</defterm>, of a person, includes the person’s—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.228-ssec.3-def.stateofmind-para1.a" guid="_99e7bc47-705c-4f19-8aa9-a34e43047333" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">knowledge, intention, opinion, belief or purpose; and</txt></block></li><li id="sec.228-ssec.3-def.stateofmind-para1.b" guid="_b8efa4f8-23df-4232-8b98-d2f6469cdfd5" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">reasons for the intention, opinion, belief or purpose.</txt></block></li></list></definition></deflist></block></subclause></clause></part></chapter><chapter id="ch.6" guid="_7a9b8532-765a-43c0-9aa7-b80d126d9cca" status="uncommenced" affected.by.uncommenced="0"><no>Chapter 6</no><heading id="ch.6-he" guid="_fff7019d-1947-4a2a-8a73-dbf8e008abe2">Dispute resolution</heading><part id="ch.6-pt.1" guid="_e22114cb-e9dd-4b2c-8940-05df99d7eef5" status="uncommenced" affected.by.uncommenced="0"><no>Part 1</no><heading id="ch.6-pt.1-he" guid="_65229119-c94c-4e1d-a340-5aaf60f7a1cf">Appeal rights</heading><clause id="sec.229" guid="_58592a19-df68-44ea-9604-716c37b96f3a" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>229</no><heading id="sec.229-he" guid="_999e3c22-a655-448b-a7e9-7d94f50bf4c5">Appeals to tribunal or P&#38;E Court</heading><subclause id="sec.229-ssec.1" guid="_80ec33aa-0b08-47b1-a6e0-a24f8b179625" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">Schedule 1 states—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.229-ssec.1-para1.a" guid="_7f1005f4-19b3-4727-b522-766071dd5441" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">matters that may be appealed to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.229-ssec.1-para1.a-para2.i" guid="_52c3bc46-7e1a-42c3-9e5d-941a3aca2c10" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">either a tribunal or the P&#38;E Court; or</txt></block></li><li id="sec.229-ssec.1-para1.a-para2.ii" guid="_d9cc4e3c-6233-430b-9198-b9554abafab7" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">only a tribunal; or</txt></block></li><li id="sec.229-ssec.1-para1.a-para2.iii" guid="_f82157b6-e583-467a-9f4a-f26b5c8d1e01" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">only the P&#38;E Court; and</txt></block></li></list></block></li><li id="sec.229-ssec.1-para1.b" guid="_41b4e81c-1455-4e7a-a096-89ba2816fd8c" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the person—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.229-ssec.1-para1.b-para2.i" guid="_2cbf3b41-b376-4ff1-b7e0-733e8fbb0cb9" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">who may appeal a matter (the <defterm id="sec.229-ssec.1-para1.b-def.appellant" guid="_3a72ad61-b926-4919-9cc5-c4eaa4a2344e" type="definition">appellant</defterm>); and</txt></block></li><li id="sec.229-ssec.1-para1.b-para2.ii" guid="_ac20f79b-f2ff-4586-9e0b-305b7afe76d2" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">who is a respondent in an appeal of the matter; and</txt></block></li><li id="sec.229-ssec.1-para1.b-para2.iii" guid="_16ddb542-d04a-4cab-887f-fe581ca98071" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">who is a co-respondent in an appeal of the matter; and</txt></block></li><li id="sec.229-ssec.1-para1.b-para2.iv" guid="_689d062d-5594-41b5-a14e-b8eb3df023c4" status="uncommenced" provision.type="other"><no>(iv)</no><block status="uncommenced"><txt break.before="1">who may elect to be a co-respondent in an appeal of the matter.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.229-ssec.2" guid="_ff6c7ea2-5086-48c2-921e-d73a8bc28436" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">An appellant may start an appeal within the appeal period.</txt></block></subclause><subclause id="sec.229-ssec.3" guid="_cae91864-37d1-4d8b-8930-8a7eec7f3ae8" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The <defterm id="sec.229-def.appealperiod" guid="_16ea337f-ff35-4307-93e4-baa28e83415b" type="definition">appeal period</defterm> is—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.229-ssec.3-para1.a" guid="_e52488dd-e089-41df-8868-8671b650794c" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for an appeal by a building advisory agency—10 business days after a decision notice for the decision is given to the agency; or</txt></block></li><li id="sec.229-ssec.3-para1.b" guid="_c1d9b301-997c-4d5c-8b6b-d88aff2f301e" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for an appeal against a deemed refusal—at any time after the deemed refusal happens; or</txt></block></li><li id="sec.229-ssec.3-para1.c" guid="_4b6f0c5a-773f-4fa4-bf1e-57a8f7e10846" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises—20 business days after a notice is published under section 269(3)(a) or (4); or</txt></block></li><li id="sec.229-ssec.3-para1.d" guid="_c70ee581-adb8-41f2-ab11-5a003ee8f42d" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">for an appeal against an infrastructure charges notice—20 business days after the infrastructure charges notice is given to the person; or</txt></block></li><li id="sec.229-ssec.3-para1.e" guid="_edb458e5-aa05-4d1a-98cf-1c488e2e19af" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">for an appeal about a deemed approval of a development application for which a decision notice has not been given—30 business days after the applicant gives the deemed approval notice to the assessment manager; or</txt></block></li><li id="sec.229-ssec.3-para1.f" guid="_273c0297-89f6-4d3f-bc84-bb09ddd25d55" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">for any other appeal—20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person.</txt></block></li></list></block><note id="sec.229-ssec.3-note" guid="_7414b084-e857-4c5a-96cf-139a5c1e528c" type="example"><heading id="sec.229-ssec.3-note-he" guid="_b0a0feef-6276-4860-9ad8-db77f2d026f1">Note—</heading><block status="uncommenced"><txt break.before="1">See the P&#38;E Court Act for the court’s power to extend the appeal period.</txt></block></note></subclause><subclause id="sec.229-ssec.4" guid="_9e20b868-34fe-419a-8f69-9da7b761a6d2" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">Each respondent and co-respondent for an appeal may be heard in the appeal.</txt></block></subclause><subclause id="sec.229-ssec.5" guid="_ea8a40d3-ee67-45ad-ada6-da95b4fa9c74" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&#38;E Court to withdraw from the appeal.</txt></block></subclause><subclause id="sec.229-ssec.6" guid="_f861a01b-4fd2-4a83-a819-6537e7bfe838" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">To remove any doubt, it is declared that an appeal against an infrastructure charges notice must not be about—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.229-ssec.6-para1.a" guid="_7af61d29-878c-4559-9180-c440f0d8a40e" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the adopted charge itself; or</txt></block></li><li id="sec.229-ssec.6-para1.b" guid="_70479f52-879c-438e-a648-6fb50fb964c2" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for a decision about an offset or refund—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.229-ssec.6-para1.b-para2.i" guid="_7bd01e7e-793b-44f3-b341-c20630953327" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the establishment cost of trunk infrastructure identified in a LGIP; or</txt></block></li><li id="sec.229-ssec.6-para1.b-para2.ii" guid="_679a64c7-3220-493b-867f-354629489cc9" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the cost of infrastructure decided using the method included in the local government’s charges resolution.</txt></block></li></list></block></li></list></block></subclause></clause><clause id="sec.230" guid="_122ba66f-6c7b-4ccb-a891-edc62efcabb4" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>230</no><heading id="sec.230-he" guid="_ecdbc3e4-4d73-4e68-85da-10a3dcc2ca47">Notice of appeal</heading><subclause id="sec.230-ssec.1" guid="_37bf14d6-17c4-4eb1-92c1-47efb2a48ca6" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">An appellant starts an appeal by lodging, with the registrar of the tribunal or P&#38;E Court, a notice of appeal that—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.230-ssec.1-para1.a" guid="_5595d197-c12b-4bf8-a213-aa42bbe7ea69" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">is in the approved form; and</txt></block></li><li id="sec.230-ssec.1-para1.b" guid="_9c0e9db5-bbf7-4fee-882b-ccb5e4dccde1" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">succinctly states the grounds of the appeal.</txt></block></li></list></block></subclause><subclause id="sec.230-ssec.2" guid="_4cac3b36-b57c-4599-82eb-83a7b94ce5c7" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The notice of appeal must be accompanied by the required fee.</txt></block></subclause><subclause id="sec.230-ssec.3" guid="_dfa49155-0581-45f4-ba60-0bf513e20d65" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.230-ssec.3-para1.a" guid="_310c739f-5524-42bf-a0be-18c0dbc0413f" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the respondent for the appeal; and</txt></block></li><li id="sec.230-ssec.3-para1.b" guid="_2af390b1-0077-43bf-ace2-16869ce1389f" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">each co-respondent for the appeal; and</txt></block></li><li id="sec.230-ssec.3-para1.c" guid="_f9340d34-1e23-4043-8d68-0d328f0ea8ae" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">for an appeal about a development application under schedule 1, table 1, item 1—each principal submitter for the development application; and</txt></block></li><li id="sec.230-ssec.3-para1.d" guid="_b1840307-6099-45de-b650-a89183bad127" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">for an appeal about a change application under schedule 1, table 1, item 2—each principal submitter for the change application; and</txt></block></li><li id="sec.230-ssec.3-para1.e" guid="_1173edaf-81ab-4434-90fb-832400c30e31" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and</txt></block></li><li id="sec.230-ssec.3-para1.f" guid="_101ba4c6-2bfc-4e27-8a04-57773195a9e6" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">for an appeal to the P&#38;E Court—the chief executive; and</txt></block></li><li id="sec.230-ssec.3-para1.g" guid="_cdd23b80-d54a-4f13-93aa-01390dab294e" status="uncommenced" provision.type="other"><no>(g)</no><block status="uncommenced"><txt break.before="1">for an appeal to a tribunal under another Act—any other person who the registrar considers appropriate.</txt></block></li></list></block></subclause><subclause id="sec.230-ssec.4" guid="_b6a72295-c754-4454-af92-f6cfccd7f827" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The <defterm id="sec.230-def.serviceperiod" guid="_fc05949e-0c31-4908-bcd5-41af16b6ed04" type="definition">service period</defterm> is—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.230-ssec.4-para1.a" guid="_729113ac-a51e-4cd4-ac15-5b7a50b84674" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if a submitter or advice agency started the appeal in the P&#38;E Court—2 business days after the appeal is started; or</txt></block></li><li id="sec.230-ssec.4-para1.b" guid="_0855153f-2ad0-4d1c-8339-f1554a083965" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">otherwise—10 business days after the appeal is started.</txt></block></li></list></block></subclause><subclause id="sec.230-ssec.5" guid="_cc55533c-8b5c-41bc-aad2-5be6d2c425a3" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6).</txt></block></subclause><subclause id="sec.230-ssec.6" guid="_60191f8c-fcae-4ea5-9066-a6b697aae3ca" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person.</txt></block></subclause></clause><clause id="sec.231" guid="_a25c1fc0-9702-4904-a16a-12c906c767aa" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>231</no><heading id="sec.231-he" guid="_b0f472cc-637c-4916-9ab4-2b6545d00ec3">Other appeals</heading><subclause id="sec.231-ssec.1" guid="_6f26ad2d-dedb-43c8-9a36-4007fcc41c8d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">Subject to this chapter, schedule 1 and the P&#38;E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable.</txt></block></subclause><subclause id="sec.231-ssec.2" guid="_04481912-38a2-470f-85a0-facaafdc089c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Judicial Review Act 1991</name></legref>, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error.</txt></block></subclause><subclause id="sec.231-ssec.3" guid="_e1a539ed-2d12-481a-adc7-25910eb11e80" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">A person who, but for subsection (1) could have made an application under the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Judicial Review Act 1991</name></legref> in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter.</txt></block></subclause><subclause id="sec.231-ssec.4" guid="_b30a0790-60dc-4ccc-8fa5-60b24855a54f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.231-ssec.4-def.decision_" guid="_655bb55e-716a-44eb-8dfb-879519ef87f3" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.231-ssec.4-def.decision" guid="_c52e4da0-3e06-4e86-901f-7c6d725c987d" type="definition">decision</defterm> includes—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.231-ssec.4-def.decision-para1.a" guid="_1e1fb17b-076a-4936-8e21-0783f26bdd16" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">conduct engaged in for the purpose of making a decision; and</txt></block></li><li id="sec.231-ssec.4-def.decision-para1.b" guid="_0556b1b8-7152-4d66-b962-1862e8f7d5a8" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">other conduct that relates to the making of a decision; and</txt></block></li><li id="sec.231-ssec.4-def.decision-para1.c" guid="_469213e3-0882-4840-8714-e1636c5a3b18" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the making of a decision or the failure to make a decision; and</txt></block></li><li id="sec.231-ssec.4-def.decision-para1.d" guid="_55400907-b282-4ae6-8f0a-00c81e6f75ee" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">a purported decision; and</txt></block></li><li id="sec.231-ssec.4-def.decision-para1.e" guid="_ba7376ea-961c-4657-ae58-dbe867b4e942" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">a deemed refusal.</txt></block></li></list></definition><definition id="sec.231-ssec.4-def.nonappealable_" guid="_7fd04a8f-6a00-4a3c-86f9-e82a858a28f7" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.231-ssec.4-def.nonappealable" guid="_79cecbcb-c559-4aa6-91c9-d9d0b33bc8a5" type="definition">non-appealable</defterm>, for a decision or matter, means the decision or matter—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.231-ssec.4-def.nonappealable-para1.a" guid="_57b4d784-c502-4c57-91c6-52dbd91906d0" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">is final and conclusive; and</txt></block></li><li id="sec.231-ssec.4-def.nonappealable-para1.b" guid="_3cf93576-fa9d-4aee-b273-d78188d503bd" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Judicial Review Act 1991</name></legref> or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and</txt></block></li><li id="sec.231-ssec.4-def.nonappealable-para1.c" guid="_c7cf47f4-bcc2-4fd7-bb79-42787a2d2863" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground.</txt></block></li></list></definition></deflist></block></subclause></clause><clause id="sec.232" guid="_f18f7f74-4cc0-45da-a845-5db2d7a73628" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>232</no><heading id="sec.232-he" guid="_ce11a552-a561-4c55-8106-9b3b68be2a02">Rules of the P&#38;E Court</heading><subclause id="sec.232-ssec.1" guid="_59dd05c3-e9e4-410c-a298-4b8c70d21449" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A person who is appealing to the P&#38;E Court must comply with the rules of the court that apply to the appeal.</txt></block></subclause><subclause id="sec.232-ssec.2" guid="_b96bf662-87f1-48b9-8dd4-2b2f8467a0bf" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, the P&#38;E Court may hear and decide an appeal even if the person has not complied with rules of the P&#38;E Court.</txt></block></subclause></clause></part><part id="ch.6-pt.2" guid="_5a1be92e-b38e-4283-a757-687f8b702137" status="uncommenced" affected.by.uncommenced="0"><no>Part 2</no><heading id="ch.6-pt.2-he" guid="_80e936b8-7e6c-4f20-9383-ba30f1de98c2">Development tribunal</heading><division id="ch.6-pt.2-div.1" guid="_9c6196ce-7893-4983-9b4b-32c2f96ebdc5" status="uncommenced" affected.by.uncommenced="0"><no>Division 1</no><heading id="ch.6-pt.2-div.1-he" guid="_5b283a2c-d289-4486-86a3-28986f6a089e">General</heading><clause id="sec.233" guid="_8fed116f-3a8b-4a5e-80ba-a71231d4c558" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>233</no><heading id="sec.233-he" guid="_6ae6eccc-788c-4ea8-bbe7-4850cde27828">Appointment of referees</heading><subclause id="sec.233-ssec.1" guid="_bb05aa3d-840a-49eb-9c34-e0f55b17daba" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The Minister, or chief executive, (the <defterm id="sec.233-def.appointer" guid="_5de30cf9-6508-4992-b951-a1f72efbb1ae" type="definition">appointer</defterm>) may appoint a person to be a referee, by an appointment notice, if the appointer considers the person—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.233-ssec.1-para1.a" guid="_0452e2a3-b242-4a4a-bbd6-ed49ccb68f06" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">has the qualifications or experience prescribed by regulation; and</txt></block></li><li id="sec.233-ssec.1-para1.b" guid="_2b405383-e825-4fca-8c86-72d340b8163a" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">has demonstrated an ability—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.233-ssec.1-para1.b-para2.i" guid="_6422b92c-3b64-48c2-b893-ce8081ed2b99" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">to negotiate and mediate outcomes between parties to a proceeding; and</txt></block></li><li id="sec.233-ssec.1-para1.b-para2.ii" guid="_04d77cef-ccef-41fe-8b72-661a74d8cb05" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">to apply the principles of natural justice; and</txt></block></li><li id="sec.233-ssec.1-para1.b-para2.iii" guid="_d8e0e3a1-5487-4e1e-ba5b-24fe3e0206b7" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">to analyse complex technical issues; and</txt></block></li><li id="sec.233-ssec.1-para1.b-para2.iv" guid="_5f988926-9b76-4105-aa36-64ccd0c29a1e" status="uncommenced" provision.type="other"><no>(iv)</no><block status="uncommenced"><txt break.before="1">to communicate effectively, including, for example, to write informed succinct and well-organised decisions, reports, submissions or other documents.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.233-ssec.2" guid="_b792caea-4a71-4d63-86aa-d1487543e0d3" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The appointer may—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.233-ssec.2-para1.a" guid="_b197939b-29a8-4878-bd9f-49e2977272e7" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">appoint a referee for the term, of not more than 3 years, stated in the appointment notice; and</txt></block></li><li id="sec.233-ssec.2-para1.b" guid="_c9a40f87-0552-4157-8d33-1bc8fc8f1bda" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">reappoint a referee, by notice, for further terms of not more than 3 years.</txt></block></li></list></block></subclause><subclause id="sec.233-ssec.3" guid="_cb225f72-428d-4bf9-88b4-67f2b7068818" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">If an appointer appoints a public service officer as a referee, the officer holds the appointment concurrently with any other appointment that the officer holds in the public service.</txt></block></subclause><subclause id="sec.233-ssec.4" guid="_5847571d-ec64-43ea-81cf-f19e798e2aa7" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">A referee must not sit on a tribunal unless the referee has given a declaration, in the approved form and signed by the referee, to the chief executive. </txt></block></subclause><subclause id="sec.233-ssec.5" guid="_a012a52b-523b-4081-aaa1-48661315f31e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The appointer may cancel a referee’s appointment at any time by giving a notice, signed by the appointer, to the referee.</txt></block></subclause><subclause id="sec.233-ssec.6" guid="_f937d729-8f95-42cd-84ba-2582bbf1aaa5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">A referee may resign the referee’s appointment at any time by giving a notice, signed by the referee, to the appointer.</txt></block></subclause><subclause id="sec.233-ssec.7" guid="_d5f1f4ef-c5c9-4c3c-ab19-5d088737ed75" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.233-ssec.7-def.appointmentnotice_" guid="_dd53f3ed-2733-4d52-bcfd-ab37c5664617" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.233-ssec.7-def.appointmentnotice" guid="_7e027d4a-228b-4233-aec8-8b1b96a623fb" type="definition">appointment notice</defterm> means—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.233-ssec.7-def.appointmentnotice-para1.a" guid="_129f7234-da27-42f5-b2c3-c0a31318fd5d" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if the Minister gives the notice—a gazette notice; or</txt></block></li><li id="sec.233-ssec.7-def.appointmentnotice-para1.b" guid="_b1599b31-11c1-45d8-bc9b-d6632761f2bd" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the chief executive gives the notice—a notice given to the person appointed as a referee.</txt></block></li></list></definition></deflist></block></subclause></clause><clause id="sec.234" guid="_905c9f04-75b4-43d2-b53e-105108f80b55" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>234</no><heading id="sec.234-he" guid="_6dfc7d79-1e2f-4240-820f-781345481604">Referee with conflict of interest</heading><subclause id="sec.234-ssec.1" guid="_8b3c0076-168c-4411-bdc2-10a2dd99440b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if the chief executive informs a referee that the chief executive proposes to appoint the referee as a tribunal member, and either or both of the following apply—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.234-ssec.1-para1.a" guid="_f3700a52-ff09-4c40-8bd9-da5f17e3d59b" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the tribunal is to hear a matter about premises—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.234-ssec.1-para1.a-para2.i" guid="_74831c24-7600-4986-b484-74f478b62784" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the referee owns; or</txt></block></li><li id="sec.234-ssec.1-para1.a-para2.ii" guid="_af644c4d-0806-4f18-bc2e-09be31dc8c1d" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">for which the referee was, is, or is to be, an architect, builder, drainer, engineer, planner, plumber, plumbing inspector, certifier, site evaluator or soil assessor; or</txt></block></li><li id="sec.234-ssec.1-para1.a-para2.iii" guid="_fb579efe-44cb-41c3-bb4e-ae0767264d08" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">for which the referee has been, is, or will be, engaged by any party in the referee’s capacity as an accountant, lawyer or other professional; or</txt></block></li><li id="sec.234-ssec.1-para1.a-para2.iv" guid="_c7339c96-5869-4421-9855-41918b2c1251" status="uncommenced" provision.type="other"><no>(iv)</no><block status="uncommenced"><txt break.before="1">situated or to be situated in the area of a local government of which the referee is an officer, employee or councillor;</txt></block></li></list></block></li><li id="sec.234-ssec.1-para1.b" guid="_66bd9336-0643-439a-8add-39eaa666682d" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the referee has a direct or indirect personal interest in a matter to be considered by the tribunal, and the interest could conflict with the proper performance of the referee’s functions for the tribunal’s consideration of the matter.</txt></block></li></list></block></subclause><subclause id="sec.234-ssec.2" guid="_33c43790-df40-4509-ad25-244a8d032ced" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, this section does not apply to a referee only because the referee previously acted in relation to the preparation of a relevant local planning instrument.</txt></block></subclause><subclause id="sec.234-ssec.3" guid="_ae542b41-c681-4c56-ae1b-06e045a4728a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The referee must notify the chief executive that this section applies to the referee, and on doing so, the chief executive must not appoint the referee to the tribunal.</txt></block></subclause><subclause id="sec.234-ssec.4" guid="_7f44413f-cec1-4c2c-90ea-51467208f739" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">If a tribunal member is, or becomes, aware the member should not have been appointed to the tribunal, the member must not act, or continue to act, as a member of the tribunal.</txt></block></subclause></clause><clause id="sec.235" guid="_11620fbb-0889-45c5-a356-a965bf39a86d" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>235</no><heading id="sec.235-he" guid="_576d8af8-3349-4e45-8e56-facb026b9764">Establishing development tribunal</heading><subclause id="sec.235-ssec.1" guid="_abcaa7e5-f3dd-49b9-b120-f24da9ca8faa" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The chief executive may at any time establish a tribunal, consisting of up to 5 referees, for tribunal proceedings.</txt></block></subclause><subclause id="sec.235-ssec.2" guid="_ad3615c6-2c98-42b5-bca1-2d63ebf60ff7" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The chief executive may appoint a referee for tribunal proceedings if the chief executive considers the referee has the qualifications or experience for the proceedings.</txt></block></subclause><subclause id="sec.235-ssec.3" guid="_4da9ca59-beb5-46b6-a0af-4092f432634e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The chief executive must appoint a referee as the chairperson for each tribunal.</txt></block></subclause><subclause id="sec.235-ssec.4" guid="_8c906ae5-7297-4010-91f8-b32f7f7e763b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">A regulation may specify the qualifications or experience required for particular proceedings.</txt></block></subclause><subclause id="sec.235-ssec.5" guid="_92534b85-29f6-42d6-86aa-dac893a8ad3d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">After a tribunal is established, the tribunal’s membership must not be changed.</txt></block></subclause></clause><clause id="sec.236" guid="_3cb039f8-989e-4940-ab18-0fb916ce218f" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>236</no><heading id="sec.236-he" guid="_a254abe9-108c-4b3b-91c8-007caab577d7">Remuneration</heading><block status="uncommenced"><txt break.before="1">A tribunal member must be paid the remuneration the Governor in Council decides.</txt></block></clause><clause id="sec.237" guid="_d36589bc-44d3-4c0a-bcf7-ed0d42c1b1e0" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>237</no><heading id="sec.237-he" guid="_b462093c-d593-4c5c-8d13-e61ee0e9c865">Tribunal proceedings</heading><subclause id="sec.237-ssec.1" guid="_f06724a1-0ba9-4343-9530-46f5919e8e0d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A tribunal must ensure all persons before the tribunal are afforded natural justice.</txt></block></subclause><subclause id="sec.237-ssec.2" guid="_041d9ac9-3b4f-4563-ac87-a515e4981016" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">A tribunal must make its decisions in a timely way.</txt></block></subclause><subclause id="sec.237-ssec.3" guid="_53e2a927-e99f-4674-ad42-76d33c88f34a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">A tribunal may—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.237-ssec.3-para1.a" guid="_1e98e36f-6c18-468b-885a-4c3b057b58f2" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">conduct its business as the tribunal considers appropriate, subject to a regulation made for this section; and</txt></block></li><li id="sec.237-ssec.3-para1.b" guid="_daa73de7-811e-4b61-87e1-2f1b646b4679" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">sit at the times and places the tribunal decides; and</txt></block></li><li id="sec.237-ssec.3-para1.c" guid="_16c9492b-4a7c-4735-9846-e9b9ab197566" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">hear an appeal and application for a declaration together; and</txt></block></li><li id="sec.237-ssec.3-para1.d" guid="_c763af07-8c8d-4b0b-9408-5bf47370c823" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">hear 2 or more appeals or applications for a declaration together.</txt></block></li></list></block></subclause><subclause id="sec.237-ssec.4" guid="_4cd193a1-4dd8-4557-b347-89dc2d884f01" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">A regulation may provide for—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.237-ssec.4-para1.a" guid="_93a0a008-4e25-490c-a329-aadf529736f0" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the way in which a tribunal is to operate, including the qualifications of the chairperson of the tribunal for particular proceedings; or</txt></block></li><li id="sec.237-ssec.4-para1.b" guid="_ca2fa5ba-e609-40a6-a6db-2bcb3be1ad1c" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the required fee for tribunal proceedings.</txt></block></li></list></block></subclause></clause><clause id="sec.238" guid="_82d13620-9f83-43b1-8231-235ac72c19c8" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>238</no><heading id="sec.238-he" guid="_2ccaf454-dacb-40b5-bd21-e011c26d611e">Registrar and other officers</heading><subclause id="sec.238-ssec.1" guid="_8c799a2a-0f69-468b-9e17-cfb77914c7fb" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The chief executive may, by gazette notice, appoint—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.238-ssec.1-para1.a" guid="_bc9a0bc8-bbde-4b14-b5e1-edcf200c8c7c" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a registrar; and</txt></block></li><li id="sec.238-ssec.1-para1.b" guid="_805764b4-26b7-4672-b109-98fbb9f20721" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">other officers (including persons who are public service officers) as the chief executive considers appropriate to help a tribunal perform its functions.</txt></block></li></list></block></subclause><subclause id="sec.238-ssec.2" guid="_b482afc0-1b34-4919-9e37-40d800dc855d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">A person may hold the appointment or assist concurrently with any other public service appointment that the person holds.</txt></block></subclause></clause></division><division id="ch.6-pt.2-div.2" guid="_41870dc1-465d-4dde-9ac8-88b8dc9895a7" status="uncommenced" affected.by.uncommenced="0"><no>Division 2</no><heading id="ch.6-pt.2-div.2-he" guid="_44fb6bbc-97aa-40fb-89ce-dd9c21c573dd">Applications for declarations</heading><clause id="sec.239" guid="_26e8a97b-4092-4c68-b7b2-44cc86d60a3e" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>239</no><heading id="sec.239-he" guid="_39592f57-58cf-4c07-8a2c-e19ea2683b50">Starting proceedings for declarations</heading><subclause id="sec.239-ssec.1" guid="_72994280-ad21-446c-8242-7f5b0765c38f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A person may start proceedings for a declaration by a tribunal by filing an application, in the approved form, with the registrar.</txt></block></subclause><subclause id="sec.239-ssec.2" guid="_11b0e9ad-1ea0-4d75-8f5f-b4ceef04977e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The application must be accompanied by the required fee.</txt></block></subclause></clause><clause id="sec.240" guid="_f73cc2bb-d329-4aea-8ab3-892d2af32cd2" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>240</no><heading id="sec.240-he" guid="_f436a201-6da3-4626-af66-0bfc3b27c8a6">Application for declaration about making of development application</heading><subclause id="sec.240-ssec.1" guid="_c77dd660-24fc-44ae-91e9-eec5ed8a392a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The following persons may start proceedings for a declaration about whether a development application is properly made—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.240-ssec.1-para1.a" guid="_61e2dcce-994a-4745-aff9-11a467b7c1d7" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the applicant;</txt></block></li><li id="sec.240-ssec.1-para1.b" guid="_1782bff0-73ed-4091-b6f3-7bb3e923b151" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the assessment manager.</txt></block></li></list></block></subclause><subclause id="sec.240-ssec.2" guid="_bffcdcc3-5ef3-4780-9945-f7989ee3791a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, a person may not seek a declaration under this section about whether a development application is accompanied by the written consent of the owner of the premises to the application.</txt></block></subclause><subclause id="sec.240-ssec.3" guid="_8fc155c4-b1d4-41ef-b763-94edab6fc34c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The proceedings must be started by—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.240-ssec.3-para1.a" guid="_d713349c-d1b0-4c3c-88e4-79f554b0d9ca" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the applicant within 20 business days after receiving notice from the assessment manager, under the development assessment rules, that the development application is not properly made; or</txt></block></li><li id="sec.240-ssec.3-para1.b" guid="_b57d3491-baa5-4763-9476-9fb5e78a7357" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the assessment manager within 10 business days after receiving the development application.</txt></block></li></list></block></subclause><subclause id="sec.240-ssec.4" guid="_86127834-2724-4083-9c39-72d4fbd52c45" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The registrar must, within 10 business days after the proceedings start, give notice of the proceedings to the respondent as a party to the proceedings.</txt></block></subclause><subclause id="sec.240-ssec.5" guid="_9b34d479-df7b-4f92-87c4-94f14a473766" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.240-ssec.5-def.respondent_" guid="_63957b29-ff63-40a7-990a-e74d9d556cb9" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.240-ssec.5-def.respondent" guid="_d66ae3c2-9a4d-49ed-9458-5c751c3d44ad" type="definition">respondent</defterm> means—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.240-ssec.5-def.respondent-para1.a" guid="_b1e76025-de82-420d-9475-05a88f0075df" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if the applicant started the proceedings—the assessment manager; or</txt></block></li><li id="sec.240-ssec.5-def.respondent-para1.b" guid="_503bd1e3-7d63-4199-962e-2033787bd157" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the assessment manager started the proceedings—the applicant.</txt></block></li></list></definition></deflist></block></subclause></clause><clause id="sec.241" guid="_fb53dd9c-7e30-42ed-9952-292ecd11e3e9" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>241</no><heading id="sec.241-he" guid="_d2bda8ce-ac63-4cf3-95f1-d1b57aa03ced">Application for declaration about change to development approval</heading><subclause id="sec.241-ssec.1" guid="_fde538f0-3365-4460-8dc6-8c7591fab816" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to a change application for a development approval if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.241-ssec.1-para1.a" guid="_3bfa35ec-dd85-46e5-9f5c-98d14b31d7a8" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the approval is for a material change of use of premises that involves the use of a classified building; and</txt></block></li><li id="sec.241-ssec.1-para1.b" guid="_fd5ff3b3-4502-4b69-a281-298c279e20b7" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the responsible entity for the change application is not the P&#38;E Court.</txt></block></li></list></block></subclause><subclause id="sec.241-ssec.2" guid="_0010efcf-476d-4bb8-94a3-c36288908a6b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The applicant, or responsible entity, for the change application may start proceedings for a declaration about whether the proposed change to the approval is a minor change.</txt></block></subclause><subclause id="sec.241-ssec.3" guid="_48040057-1bcd-420e-975f-e80bbe6d135b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The registrar must, within 10 business days after the proceedings start, give notice of the proceedings to the respondent as a party to the proceedings.</txt></block></subclause><subclause id="sec.241-ssec.4" guid="_4a0431ed-f3f8-4745-aae2-fad08dc54b77" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.241-ssec.4-def.respondent_" guid="_e50c3274-cd76-4a42-9f59-a64f498e83b7" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.241-ssec.4-def.respondent" guid="_216827ef-1273-49f3-bac6-ccfb4620cc58" type="definition">respondent</defterm> means—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.241-ssec.4-def.respondent-para1.a" guid="_e4a75a19-9782-4f0c-8742-220f74c27c40" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if the applicant started the proceedings—the responsible entity; or</txt></block></li><li id="sec.241-ssec.4-def.respondent-para1.b" guid="_bb6e7690-8192-4006-be80-f8c855c05f79" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the responsible entity started the proceedings—the applicant.</txt></block></li></list></definition></deflist></block></subclause></clause></division><division id="ch.6-pt.2-div.3" guid="_73e57700-b93b-4f46-b3e7-d117605351eb" status="uncommenced" affected.by.uncommenced="0"><no>Division 3</no><heading id="ch.6-pt.2-div.3-he" guid="_1646d254-e438-4ae0-8003-b967a9cde384">Tribunal proceedings for appeals and declarations</heading><clause id="sec.242" guid="_5bbdce18-6ae1-403a-9dc3-6b32c9c34bff" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>242</no><heading id="sec.242-he" guid="_80615d6d-0486-4ea6-8178-4ec68e118b2d">Action when proceedings start</heading><block status="uncommenced"><txt break.before="1">If a document starting tribunal proceedings is filed with the registrar within the period required under this Act, and is accompanied by the required fee, the chief executive must—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.242-para1.a" guid="_d2c7c4fa-7b44-4bfa-a0e3-3325fe75b069" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">establish a tribunal for the proceedings; and</txt></block></li><li id="sec.242-para1.b" guid="_40b34cc3-8b3e-4124-ba10-fea7c8d8e9ae" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">appoint 1 of the referees for the tribunal as the tribunal’s chairperson, in the way required under a regulation; and</txt></block></li><li id="sec.242-para1.c" guid="_37b8c8b0-1101-4bb0-95a5-709532bfa4c6" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">give notice of the establishment of the tribunal to each party to the proceedings.</txt></block></li></list></block></clause><clause id="sec.243" guid="_129dd91f-33c0-48a9-a561-6a1945964986" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>243</no><heading id="sec.243-he" guid="_a900ad36-dd55-41e4-bded-8c071269a65c">Chief executive excusing noncompliance</heading><subclause id="sec.243-ssec.1" guid="_14557571-d8f5-4128-963b-2a534f51a857" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.243-ssec.1-para1.a" guid="_4b2068a4-0a66-4991-ae0f-670e6ac91162" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the registrar receives a document purporting to start tribunal proceedings, accompanied by the required fee; and</txt></block></li><li id="sec.243-ssec.1-para1.b" guid="_f2dfbfd1-993b-4a3e-9454-9d1ad661fc0a" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the document does not comply with any requirement under this Act for validly starting the proceedings.</txt></block></li></list></block></subclause><subclause id="sec.243-ssec.2" guid="_62d062ee-b18a-499c-a661-d72197c6fb19" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The chief executive must consider the document and decide whether or not it is reasonable in the circumstances to excuse the noncompliance (because it would not cause substantial injustice in the proceedings, for example).</txt></block></subclause><subclause id="sec.243-ssec.3" guid="_717c5a9f-32bb-4be2-9a0f-17e44d6abc56" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">If the chief executive decides not to excuse the noncompliance, the chief executive must give a notice stating that the document is of no effect, because of the noncompliance, to the person who filed the document.</txt></block></subclause><subclause id="sec.243-ssec.4" guid="_2ff918ce-fd4a-49fc-bd6d-87e85f4aca3d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The chief executive must give the notice within 10 business days after the document is given to the chief executive.</txt></block></subclause><subclause id="sec.243-ssec.5" guid="_4189683b-abbe-41f6-b831-358e272d6148" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">If the chief executive does excuse the noncompliance, the chief executive may act under section 242 as if the noncompliance had not happened.</txt></block></subclause></clause><clause id="sec.244" guid="_6892b8a1-0996-406d-b3b1-d534a45675d6" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>244</no><heading id="sec.244-he" guid="_a486da95-bc61-4e9e-babb-dd7a0cb8be55">Ending tribunal proceedings or establishing new tribunal</heading><subclause id="sec.244-ssec.1" guid="_4c820e05-30d4-41ec-a758-7470f4a1ec32" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The chief executive may decide not to establish a tribunal when a document starting tribunal proceedings is filed, if the chief executive considers it is not reasonably practicable to establish a tribunal.</txt><note id="sec.244-ssec.1-note" guid="_13ffccb0-e108-4279-9f74-59402b791bb9" type="example"><heading id="sec.244-ssec.1-note-he" guid="_39de9aa1-74a6-43f2-8027-b7a9eb4baed0">Examples of when it is not reasonably practicable to establish a tribunal—</heading><block status="uncommenced"><list number.type="bull" unnumbered.indent="0"><li id="sec.244-ssec.1-note-para1" guid="_e5bec975-b3b3-4e23-94e2-83c52459508d" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">there are no qualified referees or insufficient qualified referees because of a conflict of interest</txt></block></li><li id="sec.244-ssec.1-note-para1-oc.2" guid="_9a017002-b1a6-4c86-a41a-1767f876b9dd" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">the referees who are available will not be able to decide the proceedings in a timely way</txt></block></li></list></block></note></block></subclause><subclause id="sec.244-ssec.2" guid="_5f41eaba-4e34-4657-ba17-374a0553c93b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">If the chief executive considers a tribunal established for tribunal proceedings—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.244-ssec.2-para1.a" guid="_aaf1c2b1-473e-414d-bcdb-d9df0c6b03b1" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">does not have the expertise to hear or decide the proceedings; or</txt></block></li><li id="sec.244-ssec.2-para1.b" guid="_b7e1a218-6523-4336-92e4-82ec14326361" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">is not able to make a decision for proceedings (because of a tribunal member’s conflict of interest, for example);</txt></block></li></list><txt break.before="1">the chief executive may decide to suspend the proceedings and establish another tribunal, complying with section 242(c), to hear or re-hear the proceedings.</txt></block></subclause><subclause id="sec.244-ssec.3" guid="_ba9f1ab0-bb1b-45be-b229-dae596264f14" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">However, the chief executive may instead decide to end the proceedings if the chief executive considers it is not reasonably practicable to establish another tribunal to hear or re-hear the proceedings.</txt></block></subclause><subclause id="sec.244-ssec.4" guid="_23b6c68c-3580-47a6-bee5-0f31c74c44f4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">If the chief executive makes a decision under subsection (1) or (3), the chief executive must give a decision notice about the decision to the parties to the proceedings.</txt></block></subclause><subclause id="sec.244-ssec.5" guid="_8470c6f6-13c7-4d1b-aa3f-8c062c843d0e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">Any period for starting proceedings in the P&#38;E Court, for the matter that is the subject of the tribunal proceedings, starts again when the chief executive gives the decision notice to the party who started the proceedings.</txt></block></subclause><subclause id="sec.244-ssec.6" guid="_07372456-4105-44f8-a588-24f11b9a2380" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">The decision notice must state the effect of subsection (5).</txt></block></subclause></clause><clause id="sec.245" guid="_fd4e5125-1743-4ec8-98f3-7afb541e80f0" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>245</no><heading id="sec.245-he" guid="_d719576d-a23d-40a9-bf3e-f6e87ccc4984">Refunding fees</heading><block status="uncommenced"><txt break.before="1">The chief executive may, but need not, refund all or part of the fee paid to start proceedings if the chief executive decides under section 244—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.245-para1.a" guid="_d001ee86-8c32-4956-8d48-cd4d4f4d397d" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">not to establish a tribunal; or</txt></block></li><li id="sec.245-para1.b" guid="_01f1a290-74de-4f51-8053-77f06c1a87eb" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">to end the proceedings.</txt></block></li></list></block></clause><clause id="sec.246" guid="_63b59910-24f7-438f-a80b-8fdcdef60b70" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>246</no><heading id="sec.246-he" guid="_3c712bc1-976e-42e8-b993-f5da2a199716">Further material for tribunal proceedings</heading><subclause id="sec.246-ssec.1" guid="_b1037fbf-e574-4d4d-badb-15f87ee6a25b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The registrar may, at any time, ask a person to give the registrar any information that the registrar reasonably requires for the proceedings.</txt><note id="sec.246-ssec.1-note" guid="_1a962852-5325-4b28-af88-9c6307dd6533" type="example"><heading id="sec.246-ssec.1-note-he" guid="_eb06dbf5-1e33-4fcb-8fea-03863621edb5">Examples of information that the registrar may require—</heading><block status="uncommenced"><list number.type="bull" unnumbered.indent="0"><li id="sec.246-ssec.1-note-para1" guid="_ab942c1a-727b-49e7-91ab-8c21a8a24ff1" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">material about the proceedings (plans, for example)</txt></block></li><li id="sec.246-ssec.1-note-para1-oc.2" guid="_d6b18993-6d43-4f7a-9439-2ae3b18956d9" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">information to help the chief executive decide whether to excuse noncompliance under section 243</txt></block></li><li id="sec.246-ssec.1-note-para1-oc.3" guid="_abac687d-fb24-42e3-93ce-0d4436f045be" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">for a deemed refusal—a statement of the reasons why the entity responsible for deciding the application had not decided the application during the period for deciding the application.</txt></block></li></list></block></note></block></subclause><subclause id="sec.246-ssec.2" guid="_a4b47ba6-6b98-4bfa-b46f-c63d794d8665" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The person must give the information to the registrar within 10 business days after the registrar asks for the information.</txt></block></subclause></clause><clause id="sec.247" guid="_6bb92cde-0aea-40e4-bd1b-8ebaeac73514" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>247</no><heading id="sec.247-he" guid="_84edf815-55fb-4057-abb7-185d8812b718">Representation of Minister if State interest involved</heading><block status="uncommenced"><txt break.before="1">If, before tribunal proceedings are decided, the Minister decides the proceedings involve a State interest, the Minister may be represented in the proceedings.</txt></block></clause><clause id="sec.248" guid="_1f4b340d-086b-4aee-8631-b72673e99bd8" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>248</no><heading id="sec.248-he" guid="_2e0707e6-983f-4ae5-8c5f-74690e90529b">Representation of parties at hearing</heading><block status="uncommenced"><txt break.before="1">A party to tribunal proceedings may appear—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.248-para1.a" guid="_5ca09624-be82-47d5-bfbb-71ff0ccec691" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">in person; or</txt></block></li><li id="sec.248-para1.b" guid="_84143b54-e8f6-4566-9510-54ab73be4641" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">by an agent who is not a lawyer.</txt></block></li></list></block></clause><clause id="sec.249" guid="_be0bbe02-ce96-4e03-ae62-22b1a6081900" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>249</no><heading id="sec.249-he" guid="_fbccf9b5-ed23-4212-9190-62da40486f67">Conduct of tribunal proceedings</heading><subclause id="sec.249-ssec.1" guid="_766eb460-a207-43b8-ba77-cf7fe080e279" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">Subject to section 237, the chairperson of a tribunal must decide how tribunal proceedings are to be conducted.</txt></block></subclause><subclause id="sec.249-ssec.2" guid="_2c01e766-759d-4d2e-b19e-92eecb3b1fbb" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The tribunal may decide the proceedings on submissions if the parties agree.</txt></block></subclause><subclause id="sec.249-ssec.3" guid="_461581f0-9920-49f7-8ded-ea958ebe7621" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">If the proceedings are to be decided on submissions, the tribunal must give all parties a notice asking for the submissions to be made to the tribunal within a stated reasonable period.</txt></block></subclause><subclause id="sec.249-ssec.4" guid="_bcac6099-570d-4cad-9762-5d082d312890" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">Otherwise, the tribunal must give notice of the time and place of the hearing to all parties.</txt></block></subclause><subclause id="sec.249-ssec.5" guid="_78f0fd8b-903e-4b19-8a96-058bcadb2e79" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The tribunal may decide the proceedings without a party’s submission (written or oral) if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.249-ssec.5-para1.a" guid="_bee12e40-f665-4b7e-b730-3fe9b73eab8b" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for proceedings to be decided on submissions—the party’s submission is not received within the time stated in the notice given under subsection (3); or</txt></block></li><li id="sec.249-ssec.5-para1.b" guid="_5b94aee5-c005-421c-8f81-44279a8061fd" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for proceedings to be decided by hearing—the person, or the person’s agent, does not appear at the hearing.</txt></block></li></list></block></subclause><subclause id="sec.249-ssec.6" guid="_e97b3ea5-f4c5-4d52-83cc-01df32fe1941" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">When hearing proceedings, the tribunal—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.249-ssec.6-para1.a" guid="_a05d87d7-2251-4f23-9788-4416089d6092" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">need not proceed in a formal way; and</txt></block></li><li id="sec.249-ssec.6-para1.b" guid="_8d8fe279-806f-4439-8457-7a232281ad1d" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">is not bound by the rules of evidence; and</txt></block></li><li id="sec.249-ssec.6-para1.c" guid="_343b7a4a-8b5b-4286-bb40-56d2147e923c" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">may inform itself in the way it considers appropriate; and</txt></block></li><li id="sec.249-ssec.6-para1.d" guid="_9dd356b6-60f0-45c6-bd84-90009e29dce7" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">may seek the views of any person; and</txt></block></li><li id="sec.249-ssec.6-para1.e" guid="_17f8e17b-ae55-45b2-8978-1ab2c8bd2985" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">must ensure all persons appearing before the tribunal have a reasonable opportunity to be heard; and</txt></block></li><li id="sec.249-ssec.6-para1.f" guid="_ee574b6b-9eab-4adf-b988-5e51519872ff" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">may prohibit or regulate questioning in the hearing.</txt></block></li></list></block></subclause><subclause id="sec.249-ssec.7" guid="_3d47919e-9bb7-465b-95cb-26401024887b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">If, because of the time available for the proceedings, a person does not have an opportunity to be heard, or fully heard, the person may make a submission to the tribunal.</txt></block></subclause></clause><clause id="sec.250" guid="_2736beb4-6409-48cd-9db9-4b4943f79407" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>250</no><heading id="sec.250-he" guid="_11f8ae82-ce57-4c9f-8078-7bc078e65127">Tribunal directions or orders</heading><block status="uncommenced"><txt break.before="1">A tribunal may, at any time during tribunal proceedings, make any direction or order that the tribunal considers appropriate.</txt><note id="sec.250-note" guid="_e6ec1f1a-0e89-4f19-acf2-30b7cb572297" type="example"><heading id="sec.250-note-he" guid="_4e6c732b-6b95-4082-8846-bc5aef3c16ce">Examples of directions—</heading><block status="uncommenced"><list number.type="bull" unnumbered.indent="0"><li id="sec.250-note-para1" guid="_f26b5078-aafe-492a-9138-83eb52e77592" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">a direction to an applicant about how to make their development application comply with this Act</txt></block></li><li id="sec.250-note-para1-oc.2" guid="_e477c336-4e3a-4576-a1e6-b63c57065260" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">a direction to an assessment manager to assess a development application, even though the referral agency’s response to the assessment manager was to refuse the application</txt></block></li></list></block></note></block></clause><clause id="sec.251" guid="_a5c1deca-fa18-42f4-a700-fcfc3b8104c4" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>251</no><heading id="sec.251-he" guid="_090a6158-426c-4f21-b1f8-c4dc7846de31">Matters tribunal may consider</heading><subclause id="sec.251-ssec.1" guid="_8fa86a05-cf1d-4ec4-aa35-d1b72d0c47ea" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to tribunal proceedings about—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.251-ssec.1-para1.a" guid="_c897ad2a-2712-43ad-b8d5-7b8aa0415228" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a development application or change application; or</txt></block></li><li id="sec.251-ssec.1-para1.b" guid="_2b39abab-16bd-420a-b3c8-dbb11d5097c2" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">an application or request (however called) under the <legref jurisd="QLD" type="act" check="unknown">Building Act</legref> or the <legref jurisd="QLD" type="act" check="unknown">Plumbing and Drainage Act</legref>.</txt></block></li></list></block></subclause><subclause id="sec.251-ssec.2" guid="_0ba9dd51-c17a-4df6-8881-e86e9eab79b5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The tribunal must decide the proceedings based on the laws in effect when—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.251-ssec.2-para1.a" guid="_9eef746e-30fb-4062-bc5e-18df372cf998" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the application or request was properly made; or</txt></block></li><li id="sec.251-ssec.2-para1.b" guid="_1999e38f-3214-4f9f-9281-b67dcb78092a" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the application or request was not required to be properly made—the application or request was made.</txt></block></li></list></block></subclause><subclause id="sec.251-ssec.3" guid="_9c5e1bdc-4b77-4415-b6a6-0785c8c009bf" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">However, the tribunal may give the weight that the tribunal considers appropriate, in the circumstances, to any new laws.</txt></block></subclause></clause><clause id="sec.252" guid="_c12de646-cdc3-4d8f-be4d-35cf4f66d783" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>252</no><heading id="sec.252-he" guid="_64e4c54b-c36b-48fb-b12d-987208aff98f">Deciding no jurisdiction for tribunal proceedings</heading><subclause id="sec.252-ssec.1" guid="_a80039bc-8dc9-4745-a69c-3bca65b16b7a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A tribunal may decide that the tribunal has no jurisdiction for tribunal proceedings, at any time before the proceedings are decided—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.252-ssec.1-para1.a" guid="_a7331b05-2bbe-43b7-af65-946a43849cd9" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">on the tribunal’s initiative; or</txt></block></li><li id="sec.252-ssec.1-para1.b" guid="_e20ca986-5983-4baa-9f5f-91a0269eea81" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">on the application of a party.</txt></block></li></list></block></subclause><subclause id="sec.252-ssec.2" guid="_f3c97487-f591-4380-b67c-74fcc5b39762" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">If the tribunal decides that the tribunal has no jurisdiction, the tribunal must give a decision notice about the decision to all parties to the proceedings.</txt></block></subclause><subclause id="sec.252-ssec.3" guid="_d8e70091-6ffa-4d07-8cc7-d989a77d0660" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">Any period for starting proceedings in the P&#38;E Court, for the matter that is the subject of the tribunal proceedings, starts again when the tribunal gives the decision notice to the party who started the proceedings.</txt></block></subclause><subclause id="sec.252-ssec.4" guid="_46ac47cf-2ea0-4a66-b78d-8d84724dc50e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The decision notice must state the effect of subsection (3).</txt></block></subclause><subclause id="sec.252-ssec.5" guid="_598177d6-31e0-449d-8520-49041796a3ce" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">If the tribunal decides to end the proceedings, the fee paid to start the proceedings is not refundable.</txt></block></subclause></clause><clause id="sec.253" guid="_ce325c68-e5c3-4680-a49f-95ee0a7e520b" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>253</no><heading id="sec.253-he" guid="_2cb49ad3-09ee-4109-882e-f0201970eb4b">Conduct of appeals</heading><subclause id="sec.253-ssec.1" guid="_6e356ed0-be89-41f4-bb64-93e20cf41dde" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to an appeal to a tribunal.</txt></block></subclause><subclause id="sec.253-ssec.2" guid="_3843c5f2-210b-43df-b2b5-0d9a51db2846" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">Generally, the appellant must establish the appeal should be upheld.</txt></block></subclause><subclause id="sec.253-ssec.3" guid="_011e0a1c-bb74-4dbf-969c-5d05fbf3e0cb" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">However, for an appeal by the recipient of an enforcement notice, the enforcement authority that gave the notice must establish the appeal should be dismissed.</txt></block></subclause><subclause id="sec.253-ssec.4" guid="_9b189549-2af3-487f-98a9-696426e77de0" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The tribunal must hear and decide the appeal by way of a reconsideration of the evidence that was before the person who made the decision appealed against.</txt></block></subclause><subclause id="sec.253-ssec.5" guid="_a7bb989b-e63f-406d-914f-7c2e12567c77" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">However, the tribunal may, but need not, consider—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.253-ssec.5-para1.a" guid="_7f5e32a8-c052-42ce-826d-56be73866a76" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">other evidence presented by a party to the appeal with leave of the tribunal; or</txt></block></li><li id="sec.253-ssec.5-para1.b" guid="_5dedafc3-d10a-4809-9ba6-899cc5d0f8b2" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">any information provided under section 246.</txt></block></li></list></block></subclause></clause><clause id="sec.254" guid="_cf0c609c-8b59-452d-ba55-f6da1c48566c" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>254</no><heading id="sec.254-he" guid="_d7e6acba-5fa0-4801-a9ac-1ad1bec12121">Deciding appeals to tribunal</heading><subclause id="sec.254-ssec.1" guid="_140c47b9-ae53-4617-b961-2b5c49a02c22" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to an appeal to a tribunal against a decision.</txt></block></subclause><subclause id="sec.254-ssec.2" guid="_2a13fb9b-8578-4415-97a8-54dc76281dd2" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The tribunal must decide the appeal by—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.254-ssec.2-para1.a" guid="_9c350f2a-9024-4448-b14f-904adffdf54a" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">confirming the decision; or</txt></block></li><li id="sec.254-ssec.2-para1.b" guid="_5d6a99f3-ce18-4db8-a3b8-673a18e0b12c" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">changing the decision; or</txt></block></li><li id="sec.254-ssec.2-para1.c" guid="_e1527198-3dc7-4bec-8b83-df292fc4d72e" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">replacing the decision with another decision; or</txt></block></li><li id="sec.254-ssec.2-para1.d" guid="_e6200c47-25d0-4047-915b-d2f643017c73" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">setting the decision aside, and ordering the person who made the decision to remake the decision by a stated time; or</txt></block></li><li id="sec.254-ssec.2-para1.e" guid="_3aef0c1f-06ce-4d92-b45d-81eb740164e7" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">for a deemed refusal of an application—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.254-ssec.2-para1.e-para2.i" guid="_61efe485-fcf0-4db9-9176-a6723b5ec8e5" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">ordering the entity responsible for deciding the application to decide the application by a stated time and, if the entity does not comply with the order, deciding the application; or</txt></block></li><li id="sec.254-ssec.2-para1.e-para2.ii" guid="_330dc0bf-ba1f-42c5-9e61-740c8fcc5df5" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">deciding the application.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.254-ssec.3" guid="_9263920d-94fc-46ee-b32c-4814704058f6" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">However, the tribunal must not make a change, other than a minor change, to a development application.</txt></block></subclause><subclause id="sec.254-ssec.4" guid="_9b946523-cad0-4f4e-a67d-f36107fb60be" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The tribunal’s decision takes the place of the decision appealed against.</txt></block></subclause><subclause id="sec.254-ssec.5" guid="_30545959-05cf-4018-83aa-9082e0cc58b3" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The tribunal’s decision starts to have effect—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.254-ssec.5-para1.a" guid="_594a563e-a047-4aa9-a578-1932e18128aa" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if a party does not appeal the decision—at the end of the appeal period for the decision; or</txt></block></li><li id="sec.254-ssec.5-para1.b" guid="_84caa6ab-567e-4a65-8f7d-43010e872ec6" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if a party appeals against the decision to the P&#38;E Court—subject to the decision of the court, when the appeal ends.</txt></block></li></list></block></subclause></clause><clause id="sec.255" guid="_02b88cc1-66c4-4bde-b474-55d6ae136c10" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>255</no><heading id="sec.255-he" guid="_64709334-480a-4bd3-bfde-d5a1f9d8111c">Notice of tribunal’s decision</heading><block status="uncommenced"><txt break.before="1">A tribunal must give a decision notice about the tribunal’s decision for tribunal proceedings, other than for any directions or interim orders given by the tribunal, to all parties to proceedings.</txt></block></clause><clause id="sec.256" guid="_8a13a7f9-5289-4e3d-b1a7-0e6ae08aa7e5" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>256</no><heading id="sec.256-he" guid="_b1f3d024-61bb-45f5-8c66-7def8132d91f">No costs orders</heading><block status="uncommenced"><txt break.before="1">A tribunal must not make any order as to costs.</txt></block></clause><clause id="sec.257" guid="_137a3360-e6fa-42e8-a34e-7d28a6b9ca46" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>257</no><heading id="sec.257-he" guid="_50bb3499-d641-4b0e-9670-dbd7448a4b92">Recipient’s notice of compliance with direction or order</heading><block status="uncommenced"><txt break.before="1">If a tribunal directs or orders a party to do something, the party must notify the registrar when the thing is done.</txt></block></clause><clause id="sec.258" guid="_48c8fde4-49b3-40ec-9a5d-f6297c3e86f1" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>258</no><heading id="sec.258-he" guid="_0a1b6909-bf18-4971-956d-c80ad4dc9890">Tribunal may extend period to take action</heading><subclause id="sec.258-ssec.1" guid="_c124da20-b3dd-40c6-8aa8-923103ec7930" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if, under this chapter, an action for tribunal proceedings must be taken within a stated period or before a stated time, even if the period has ended or the time has passed.</txt></block></subclause><subclause id="sec.258-ssec.2" guid="_325997b7-a22b-4846-934d-9537c6c1e945" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The tribunal may allow a longer period or a different time to take the action if the tribunal considers there are sufficient grounds for the extension.</txt></block></subclause></clause><clause id="sec.259" guid="_7d39f5c5-ce96-461a-889d-40497f4c2ad8" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>259</no><heading id="sec.259-he" guid="_828da9b1-38e4-49af-95c1-0dc6c5efd9ce">Publication of tribunal decisions</heading><block status="uncommenced"><txt break.before="1">The registrar must publish tribunal decisions under the arrangements, and in the way, that the chief executive decides.</txt></block></clause></division></part></chapter><chapter id="ch.7" guid="_88574a26-2e3d-4ab0-8c5e-cdb14c1e392c" status="uncommenced" affected.by.uncommenced="0"><no>Chapter 7</no><heading id="ch.7-he" guid="_ab39a1db-4498-4308-910c-89c66db09342">Miscellaneous</heading><part id="ch.7-pt.1" guid="_ffcf8303-985c-42a9-965f-78880738f3e9" status="uncommenced" affected.by.uncommenced="0"><no>Part 1</no><heading id="ch.7-pt.1-he" guid="_cefe112b-1437-4ca9-a128-e1363e946ec9">Existing uses and rights protected</heading><clause id="sec.260" guid="_9d2bc5e7-18c7-462d-8f01-340ce47a135d" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>260</no><heading id="sec.260-he" guid="_007a1eba-7dac-4f91-bac4-5898d3fed313">Existing lawful uses, works and approvals</heading><subclause id="sec.260-ssec.1" guid="_0682ad01-2b75-428d-8fd3-985e605e686c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">If, immediately before a planning instrument change, a use of premises was a lawful use of premises, the change does not—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.260-ssec.1-para1.a" guid="_228a3118-3275-4a9e-96c9-835d162436dc" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">stop the use from continuing; or</txt></block></li><li id="sec.260-ssec.1-para1.b" guid="_55307e27-a0f7-42f4-9827-1cce41677aa4" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">further regulate the use; or</txt></block></li><li id="sec.260-ssec.1-para1.c" guid="_a0f72b0d-9c34-45f9-a9f7-61998704926c" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">require the use to be changed.</txt></block></li></list></block></subclause><subclause id="sec.260-ssec.2" guid="_7dec3495-6379-484c-a8a9-eb9eea9521b4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">If a planning instrument change happens after building or other works have been lawfully constructed or effected, the change does not require the building or works to be altered or removed.</txt></block></subclause><subclause id="sec.260-ssec.3" guid="_8321fc02-294d-4a23-87de-94480b2d9c68" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">If a planning instrument change happens after a development approval is given, the change does not—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.260-ssec.3-para1.a" guid="_09f99ae4-dd78-4264-8f3b-097b76754121" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">stop or further regulate the development; or</txt></block></li><li id="sec.260-ssec.3-para1.b" guid="_01ea388a-c026-441b-9016-908250adfe91" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">otherwise affect the approval to any extent to which the approval remains in effect.</txt></block></li></list></block></subclause></clause><clause id="sec.261" guid="_40d3e610-6175-414d-94f9-6529ba95adb9" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>261</no><heading id="sec.261-he" guid="_4966b27f-067d-497d-99a0-23b7dec51ebf">Implied and uncommenced right to use</heading><subclause id="sec.261-ssec.1" guid="_a76bc947-9e8c-4fa2-aeab-cf17441450a1" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.261-ssec.1-para1.a" guid="_9d308742-af38-4d36-9751-663756fbaf38" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a development approval comes into effect; and</txt></block></li><li id="sec.261-ssec.1-para1.b" guid="_916c9bdd-9880-4e48-9dd1-a67b84bcf8d6" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">when the development application was properly made, a material change of use for a use that the application implies was accepted development; and</txt></block></li><li id="sec.261-ssec.1-para1.c" guid="_6ebd18c0-df1a-4808-a4b6-8a67ec30d520" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">after the application was properly made, but before the use started, a planning instrument change provided for the material change of use to be assessable development or prohibited development.</txt></block></li></list></block></subclause><subclause id="sec.261-ssec.2" guid="_f283feed-0f2a-499e-a6c6-3bacf84c8013" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The use is taken to be a lawful use in existence immediately before the change if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.261-ssec.2-para1.a" guid="_0f567340-8c19-4228-973a-649ab8c82f8b" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the development approval has not lapsed; and</txt></block></li><li id="sec.261-ssec.2-para1.b" guid="_4de610f6-6737-4d27-b2bd-45d4ce928488" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the use starts within 5 years after the completion of the development.</txt></block></li></list></block></subclause></clause><clause id="sec.262" guid="_5604366d-a38d-4f7f-9082-a1824dea6aed" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>262</no><heading id="sec.262-he" guid="_7caa5e39-6017-493e-a47e-d9fc52ce2180">Prospective categorising regulations unaffected</heading><block status="uncommenced"><txt break.before="1">To remove any doubt, it is declared that this part does not affect the regulation-making power under section 43 or 44 for development starting on or after the regulation is notified.</txt></block></clause></part><part id="ch.7-pt.2" guid="_3170c11b-67a9-4436-9128-e89b7659a9f3" status="uncommenced" affected.by.uncommenced="0"><no>Part 2</no><heading id="ch.7-pt.2-he" guid="_4dbff96e-c303-4ac7-a4c7-8beeeeb5adc5">Taking or purchasing land for planning purposes</heading><clause id="sec.263" guid="_0568c233-6526-4512-a69b-b823b16d3d3f" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>263</no><heading id="sec.263-he" guid="_d79f76ca-77a8-4d06-b615-d3a84b936da5">Taking or purchasing land for planning purposes</heading><subclause id="sec.263-ssec.1" guid="_3799a017-3676-40f3-8be5-3e912479e0c0" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.263-ssec.1-para1.a" guid="_34297605-bef2-4b85-a7fa-801387da0c44" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a local government considers that taking or purchasing land would help to achieve the outcomes stated in a local planning instrument; or</txt></block></li><li id="sec.263-ssec.1-para1.b" guid="_fe3ec85a-cfc5-46f9-a7c6-fd1722e1ded2" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">after a development approval starts to have effect, the local government is satisfied—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.263-ssec.1-para1.b-para2.i" guid="_f94b37e4-6d8b-4be5-8085-5043c004f344" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the development would create a need to construct infrastructure on land or to carry drainage over land; and</txt></block></li><li id="sec.263-ssec.1-para1.b-para2.ii" guid="_9a3f8fb1-367c-414a-a132-6dff64f6795d" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">a person with the benefit of the approval has taken reasonable steps to get the agreement of the owner of the land to actions that would facilitate the construction or carriage, but has not been able to get the agreement; and</txt></block></li><li id="sec.263-ssec.1-para1.b-para2.iii" guid="_e30c3301-6bd3-4f39-8396-1e2bb5e7e502" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">the action is necessary for the development.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.263-ssec.2" guid="_9f3f53ed-d117-4e90-b673-0445ea503c1d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">For subsection (1)(b), it does not matter that the person with the benefit of the approval may derive a measurable benefit from the action.</txt></block></subclause><subclause id="sec.263-ssec.3" guid="_5e7d0d41-6576-4898-903a-203e6e55ac5a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">If the Governor in Council, by order in council, approves the taking or purchasing, the local government is taken to be a constructing authority under the Acquisition Act and may take or purchase the land under that Act, including by taking an easement.</txt></block><note id="sec.263-ssec.3-note" guid="_ced9d828-e7fe-4696-9fa6-9522c829d06d" type="example"><heading id="sec.263-ssec.3-note-he" guid="_d1c28ca2-8f56-43bc-a623-2a2d61aa445a">Note—</heading><block status="uncommenced"><txt break.before="1">For the ways of taking land, see the Acquisition Act, part 2. For compensation for land taken under that Act, see part 4 of that Act.</txt></block></note></subclause><subclause id="sec.263-ssec.4" guid="_51c6152d-20bb-436f-b57d-b539513cb3f6" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">An order in council made under subsection (3) is subordinate legislation.</txt></block></subclause></clause></part><part id="ch.7-pt.3" guid="_70aa9564-7bb2-4710-b201-b6881ef9c768" status="uncommenced" affected.by.uncommenced="0"><no>Part 3</no><heading id="ch.7-pt.3-he" guid="_b1bcd313-605a-4420-80de-b9d8657562f6">Public access to documents</heading><clause id="sec.264" guid="_da27b3b6-5c46-4eb6-b976-1c1582183367" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>264</no><heading id="sec.264-he" guid="_b12f6265-45a2-441f-87ff-f7884c8fad01">Public access to documents</heading><subclause id="sec.264-ssec.1" guid="_0272a7f4-4cf3-45e0-8c8a-9a40b59bc79c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A regulation may prescribe, for a person who has, or has had, powers or functions in relation to this Act—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.264-ssec.1-para1.a" guid="_9e5bf8a2-1932-4eb8-b415-c91beb9a9601" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the documents, including a register, relating to the person’s functions, that the person must or may keep publicly available; and</txt></block></li><li id="sec.264-ssec.1-para1.b" guid="_58cef0fa-de46-4d0e-906c-b7e00677e975" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">where, and in what form the documents must or may be kept; and</txt></block></li><li id="sec.264-ssec.1-para1.c" guid="_71af5bcb-fe6b-4b07-ad6b-bf06a8138851" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">whether the documents, or a certified copy of the documents must, or may be kept; and</txt></block></li><li id="sec.264-ssec.1-para1.d" guid="_430a8531-7926-4934-92b1-5c2efd23b182" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">whether the documents must or may be kept available for inspection and purchase, or for inspection only; and</txt></block></li><li id="sec.264-ssec.1-para1.e" guid="_e1795b5e-425e-411c-8952-da3ea21ef0ed" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">the period or periods during which the documents must or may be kept.</txt></block></li></list></block></subclause><subclause id="sec.264-ssec.2" guid="_ec626c7f-57e3-4550-8cec-b69991d95cb9" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">For a person who gives an exemption certificate, the regulation must require the person to keep the following available for inspection and purchase—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.264-ssec.2-para1.a" guid="_d040eca9-9197-48ea-8d4d-2aaf0ea9aac8" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a copy of each exemption certificate given by the person;</txt></block></li><li id="sec.264-ssec.2-para1.b" guid="_b371a04e-637d-496f-b3e3-05f8eaf0e484" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a register of exemption certificates given by the person.</txt></block></li></list></block></subclause><subclause id="sec.264-ssec.3" guid="_6ff39ad4-0151-401f-868e-af8c425bbe58" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">Unless the regulation states otherwise—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.264-ssec.3-para1.a" guid="_da0f812d-4e5c-41bc-9a23-f609227ffc1d" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the person may keep the documents in electronic form; and</txt></block></li><li id="sec.264-ssec.3-para1.b" guid="_151fda9f-83cd-44d8-b8f8-e3bd463699c0" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">different registers may be kept for different types of documents.</txt></block></li></list></block></subclause><subclause id="sec.264-ssec.4" guid="_6556f27e-441f-4687-9fe9-602d6aa860ff" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">Subject to subsections (5) to (7), the person must comply with the regulation.</txt><penalty id="sec.264-ssec.4-pen" guid="_99827ad9-3e2d-4f5e-8e30-8817842c3707"><block status="uncommenced"><txt break.before="1">Maximum penalty—50 penalty units.</txt></block></penalty></block></subclause><subclause id="sec.264-ssec.5" guid="_c41ed9bd-5b0e-49ed-955e-37699746fbc2" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">If a document is kept available—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.264-ssec.5-para1.a" guid="_d81a7248-04e6-423e-b0b5-3b0db5405493" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for inspection or purchase, the person must allow another person—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.264-ssec.5-para1.a-para2.i" guid="_d10920d2-583f-43a1-b574-c3b8d919e99e" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">to inspect the document free of charge at the place where the document is held, whenever the place is open for business; and</txt></block></li><li id="sec.264-ssec.5-para1.a-para2.ii" guid="_00fc2151-4b88-44bd-b26a-b3171fe7bbcb" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">to get a copy of all or part of the document from the person, for the reasonable cost, but for no more than the cost, of supplying the copy; and</txt></block></li></list></block></li><li id="sec.264-ssec.5-para1.b" guid="_2c4c84d9-7a57-44f5-beae-91617f30817a" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for inspection only, the person must allow another person to inspect the document free of charge at the place where the document is held, whenever the place is open for business, but need not give a copy to the person; and</txt></block></li><li id="sec.264-ssec.5-para1.c" guid="_299ec9ad-79f2-4173-9732-6feab1fe3a9b" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">on the person’s website, the person must allow another person to do the following free of charge—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.264-ssec.5-para1.c-para2.i" guid="_a2cfd507-849f-4b59-a933-23f6c4565827" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">to view the document on the website; and</txt></block></li><li id="sec.264-ssec.5-para1.c-para2.ii" guid="_1149edb0-8730-452a-a9ab-b5cd187717d2" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">to download the document in the form that the person decides.</txt></block></li></list></block></li></list><penalty id="sec.264-ssec.5-pen" guid="_fb0b38f4-e6b8-4d1f-8104-fa5dd0663718"><block status="uncommenced"><txt break.before="1">Maximum penalty—50 penalty units.</txt></block></penalty></block></subclause><subclause id="sec.264-ssec.6" guid="_645c0861-e6ee-4b86-9c16-e4ca63d37c7e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">For a document of a type prescribed by regulation, this section does not apply to the person to the extent the person reasonably considers the document contains—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.264-ssec.6-para1.a" guid="_eda9c5e4-c798-4651-afa9-d964f2fa2a14" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">information of a purely private nature about an individual (the individual's residential or email address or phone number, for example); or</txt></block></li><li id="sec.264-ssec.6-para1.b" guid="_92c1d49b-33e2-44a5-a838-265bb455fb1f" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">sensitive security information (the location of a safe, for example).</txt></block></li></list></block></subclause><subclause id="sec.264-ssec.7" guid="_197f0fb8-6bd1-4183-b418-4ee3d981a10b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">The person need not disclose a submitter’s name, contact details or signature.</txt></block></subclause></clause><clause id="sec.265" guid="_cd46237d-3224-4fd2-963b-7b06a95c823e" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>265</no><heading id="sec.265-he" guid="_04794ab6-5d54-4e4a-abac-b9bacfa561f2">Planning and development certificates</heading><subclause id="sec.265-ssec.1" guid="_f7028331-d353-46de-bc4b-0353b5e3dfe0" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A person may apply to a local government for a limited, standard or full planning and development certificate for premises.</txt></block></subclause><subclause id="sec.265-ssec.2" guid="_ea44197e-b067-4dfb-9996-a6572e3ad232" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The application must be accompanied by the required fee.</txt></block></subclause><subclause id="sec.265-ssec.3" guid="_0ed8389d-cb93-4d73-99b1-c2d2e700bf81" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The local government must give the certificate to the applicant within the following period after the application is made—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.265-ssec.3-para1.a" guid="_cb67a1a5-dc28-4840-abab-9e14e61b85e8" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for a limited certificate—5 business days;</txt></block></li><li id="sec.265-ssec.3-para1.b" guid="_8a44b28e-76a7-426e-bbe6-aeb880002f2e" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for a standard certificate—10 business days;</txt></block></li><li id="sec.265-ssec.3-para1.c" guid="_c7a59def-53c8-405a-9b95-dfeff6bd1a0c" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">for a full certificate—30 business days.</txt></block></li></list></block></subclause><subclause id="sec.265-ssec.4" guid="_d6412ae6-bbb6-46c0-a9c3-3d3c92645413" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The certificate must include the information prescribed by regulation.</txt></block></subclause><subclause id="sec.265-ssec.5" guid="_4ce657a7-3076-454e-b4b7-6ae4a05b1f2f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">A person who suffers financial loss because of an error or omission in a planning and development certificate may claim reasonable compensation from the local government if the claim is made within 6 years after the loss is first suffered.</txt></block></subclause><subclause id="sec.265-ssec.6" guid="_d7de2638-729c-4329-968b-ddfdfb66464b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">Section 32 applies to the claim as if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.265-ssec.6-para1.a" guid="_796086cc-e116-48f2-9d27-aea978c77466" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the claim were a compensation claim; or</txt></block></li><li id="sec.265-ssec.6-para1.b" guid="_be05ee4a-ad19-4a26-9f76-347659ddc93e" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a reference to the affected owner were a reference to the person.</txt></block></li></list></block></subclause></clause></part><part id="ch.7-pt.4" guid="_ceba423d-64ee-463d-bb6e-e365674255f7" status="uncommenced" affected.by.uncommenced="0"><no>Part 4</no><heading id="ch.7-pt.4-he" guid="_2145f9d7-27d7-40ad-af20-d7e0db4e1e30">Urban encroachment</heading><clause id="sec.266" guid="_8371ffb2-3fcc-49e2-9297-a2bbb21caf4f" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>266</no><heading id="sec.266-he" guid="_a75cd803-d66c-4422-843d-c0723c4e7f07">Purpose of part</heading><block status="uncommenced"><txt break.before="1">The purpose of this part is to protect existing uses of particular premises from certain effects of encroachment by newer uses in the vicinity of the premises by—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.266-para1.a" guid="_531af33f-802c-4ffd-8721-a018858d559a" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">providing for the registration of the premises; and</txt></block></li><li id="sec.266-para1.b" guid="_5d83a14d-0f8e-4647-b3f6-8a3527bb318c" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">establishing the responsibilities of particular persons in the area (the <defterm id="sec.266-def.affectedarea" guid="_5f86ca5e-ff3e-4b87-bcc0-00ca4f0859ae" type="definition">affected area</defterm>) to which the registration relates; and</txt></block></li><li id="sec.266-para1.c" guid="_66a3e322-0f1c-491a-a105-d6e1073a44af" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">restricting particular proceedings in connection with emissions coming from registered premises.</txt></block></li></list></block></clause><clause id="sec.267" guid="_2b6df67f-406e-4dd5-b903-590f773e6f72" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>267</no><heading id="sec.267-he" guid="_7ee41fb5-3251-4db5-bf19-2823f2b99cd9">Making or renewing registrations</heading><subclause id="sec.267-ssec.1" guid="_5910ad97-92b2-4c2a-9cc9-3317a4014a90" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to premises if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.267-ssec.1-para1.a" guid="_ebafcf54-084c-44cd-9d10-a8ec01a95f51" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">an activity that involves emissions is carried out on the premises; and</txt></block></li><li id="sec.267-ssec.1-para1.b" guid="_a6ab64c1-8deb-4296-8950-3c28208acc1c" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the levels of emissions from the premises comply with—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.267-ssec.1-para1.b-para2.i" guid="_ce1ba197-1fbf-43be-a6c1-37eaab9e3645" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">any development approval for the premises; and</txt></block></li><li id="sec.267-ssec.1-para1.b-para2.ii" guid="_e1097804-ebb0-4b79-b3a0-0f30338b1e16" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">any authority under the Environmental Protection Act (an <defterm id="sec.267-ssec.1-para1.b-def.environmentalauthority" guid="_55ee470d-2a31-4cc2-9f39-ff401bcf6cc6" type="definition">environmental authority</defterm>) applying to the activity.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.267-ssec.2" guid="_3fb2364b-c6d6-4bd5-b21f-24d7df3ce91d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The owner of the premises may apply to the Minister to register the premises.</txt></block></subclause><subclause id="sec.267-ssec.3" guid="_bd85b839-67f9-4ade-a9a5-215b2132d8b2" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The Minister must consider the application and decide to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.267-ssec.3-para1.a" guid="_4a8e2f08-14cb-4367-bb9f-26bdc7e66026" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">register the premises, with or without conditions; or</txt></block></li><li id="sec.267-ssec.3-para1.b" guid="_d6e830c7-51b4-46f6-a61f-cf094d91bd86" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">refuse to register the premises.</txt></block></li></list></block></subclause><subclause id="sec.267-ssec.4" guid="_8432a9cf-b89d-44dd-b6a5-656faa683cd4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The owner of registered premises may apply to the Minister to renew the registration of premises, before the registration expires.</txt></block></subclause><subclause id="sec.267-ssec.5" guid="_f2a12135-9b07-4531-95d6-4237803de5ca" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The Minister must consider the application and decide to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.267-ssec.5-para1.a" guid="_7780457d-4dfb-4c41-a689-7ffc71f76469" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">renew the registration, with or without conditions; or</txt></block></li><li id="sec.267-ssec.5-para1.b" guid="_5ce1e29a-a963-4539-ac81-de60c9d1d472" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">refuse to renew the registration.</txt></block></li></list></block></subclause><subclause id="sec.267-ssec.6" guid="_acd432a6-b7cc-4376-9c35-8da1f089b871" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">If an application to renew the registration of premises is made before the registration expires, the registration continues until the application—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.267-ssec.6-para1.a" guid="_91436807-fa7e-45ec-8243-b315ee7b1fc8" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">is decided; or</txt></block></li><li id="sec.267-ssec.6-para1.b" guid="_c0ff7a2d-682a-4c9d-bd93-beda98e8a21e" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">is withdrawn, or taken to have been withdrawn, by the applicant.</txt></block></li></list><note id="sec.267-ssec.6-note" guid="_97744969-621c-44dc-81b6-d8c255a1fe96" type="example"><heading id="sec.267-ssec.6-note-he" guid="_3e01a9b5-3062-4755-953f-eaff0deb3f30">Note—</heading><block status="uncommenced"><txt break.before="1">A regulation made under section 275 may prescribe the circumstances in which an application is taken to have been withdrawn.</txt></block></note></block></subclause><subclause id="sec.267-ssec.7" guid="_2b7f287e-6174-4d6c-aca4-7a3ca6a53f50" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">The Minister may register premises, or renew the registration of premises, if the Minister is satisfied—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.267-ssec.7-para1.a" guid="_75d01ed0-2ed0-48d4-ad13-9acce15e6d24" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the levels of emissions from the premises comply with—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.267-ssec.7-para1.a-para2.i" guid="_04c37107-2b26-4809-abb3-40720f1bae76" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">any development approval for the premises; and</txt></block></li><li id="sec.267-ssec.7-para1.a-para2.ii" guid="_055ee7ce-dda5-496d-a1e8-5d33398c2dff" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">an environmental authority applying to the activity; and</txt></block></li></list></block></li><li id="sec.267-ssec.7-para1.b" guid="_165424fa-1ba4-4c6c-9762-ab712bf9c129" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">about any matters prescribed by regulation.</txt></block></li></list></block></subclause><subclause id="sec.267-ssec.8" guid="_e3853cd6-2deb-4b8d-937c-62af87a5d783" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(8)</no><block status="uncommenced"><txt break.before="1">The Minister must, as soon as practicable after deciding an application under subsection (3) or (5), give a decision notice to the applicant.</txt></block></subclause><subclause id="sec.267-ssec.9" guid="_7fc86652-cc50-4800-b7c4-2e9c467ada99" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(9)</no><block status="uncommenced"><txt break.before="1">The decision notice must identify the affected area for the premises.</txt></block></subclause><subclause id="sec.267-ssec.10" guid="_cfe03c56-ffce-4cc4-8b3b-6ccca992f269" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(10)</no><block status="uncommenced"><txt break.before="1">The registration of premises starts to have effect on—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.267-ssec.10-para1.a" guid="_81b83d3c-9478-4433-b5e1-fdb88970e57d" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for a decision to register premises—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.267-ssec.10-para1.a-para2.i" guid="_580ecd53-c782-4137-900d-14ac5424c797" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the day the decision notice is given to the applicant; or</txt></block></li><li id="sec.267-ssec.10-para1.a-para2.ii" guid="_ce40acbe-f7dc-4c84-b891-8d1c7641fbb2" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">a later day stated in the decision notice; or</txt></block></li></list></block></li><li id="sec.267-ssec.10-para1.b" guid="_1abb90dc-0ecc-4ab4-950d-bb07ffbfee49" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for a decision to renew the registration of premises—the day after the registration would have ended if the registration had not been renewed.</txt></block></li></list></block></subclause><subclause id="sec.267-ssec.11" guid="_8189a845-7391-4399-8d18-2c40ec546b8c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(11)</no><block status="uncommenced"><txt break.before="1">A registration, including a renewed registration, that is not cancelled, continues to have effect for—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.267-ssec.11-para1.a" guid="_58ee16da-da5c-4cb6-be0f-f9f070d4d8a3" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the period of between 10 years and 25 years stated in the decision notice; or</txt></block></li><li id="sec.267-ssec.11-para1.b" guid="_9623c925-5903-4a39-8c7d-58dd08a443b4" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the decision notice does not state a period—10 years.</txt></block></li></list></block></subclause><subclause id="sec.267-ssec.12" guid="_9e66ccb5-789c-449c-a262-98d1ddcd073c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(12)</no><block status="uncommenced"><txt break.before="1">As soon as practicable after premises are registered, or a registration is renewed, the Minister must give notice of the registration or renewal to each local government in whose local government area the affected area for the registered premises is situated.</txt></block></subclause><subclause id="sec.267-ssec.13" guid="_9c6aa154-6e52-4383-b12b-c9fa688764f2" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(13)</no><block status="uncommenced"><txt break.before="1">As soon as practicable after receiving the notice, the local government must note the registration on—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.267-ssec.13-para1.a" guid="_4a0dc449-49bc-4c90-b470-c7232a720fc2" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the local government’s planning scheme; and</txt></block></li><li id="sec.267-ssec.13-para1.b" guid="_983c09c7-8fce-46dd-b140-cdf13145456f" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">any planning scheme that the local government makes before the registration expires.</txt></block></li></list></block></subclause></clause><clause id="sec.268" guid="_a78b79f0-1379-4845-a251-f974de0be8df" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>268</no><heading id="sec.268-he" guid="_bb654039-f0c9-4eae-a30b-404c7b8e1c4f">Amending or cancelling registrations</heading><subclause id="sec.268-ssec.1" guid="_43d65a41-05a3-450a-9b50-50285c7d0d46" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The Minister, after considering any representations from the owner of registered premises, may decide to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.268-ssec.1-para1.a" guid="_b14325f8-fbbd-45bf-961c-e6c266915bec" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">amend the conditions of the registration; or</txt></block></li><li id="sec.268-ssec.1-para1.b" guid="_85f9df54-dd77-4150-8b5a-b7d977932244" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">cancel the registration if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.268-ssec.1-para1.b-para2.i" guid="_ae0c70cf-9f89-41a2-a1ca-53771ebbcae8" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the levels of emissions from the premises no longer comply with section 267(7)(a); or</txt></block></li><li id="sec.268-ssec.1-para1.b-para2.ii" guid="_84381369-292e-4ad9-b8ed-538dced35f22" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">a condition of the registration is contravened.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.268-ssec.2" guid="_5fbad836-efc2-426e-a7a6-4f5c9f9e1784" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The Minister must give a decision notice to the owner.</txt></block></subclause><subclause id="sec.268-ssec.3" guid="_9a0ae027-66f2-49bd-b33f-9dedcad6d296" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">If the Minister decides to amend or cancel a registration, the amendment or cancellation starts to have effect on—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.268-ssec.3-para1.a" guid="_f99e6a13-3a38-4b76-a333-fc97adbd569b" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the day the notice is given to the owner; or</txt></block></li><li id="sec.268-ssec.3-para1.b" guid="_351a51ba-3ff3-4ebb-8147-27b01ac1abc5" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a later day stated in the notice.</txt></block></li></list></block></subclause><subclause id="sec.268-ssec.4" guid="_c3a542e8-97cf-45f1-bfdc-7f3ee1529154" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The owner of registered premises may, by notice given to the Minister, cancel the registration.</txt></block></subclause><subclause id="sec.268-ssec.5" guid="_5e0f873f-abf7-42fd-bde7-ee88526436f5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The registration ends on—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.268-ssec.5-para1.a" guid="_f41c7272-cdca-4b02-a2dd-ec0ee7a6e64a" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the day the Minister receives the owner’s notice; or</txt></block></li><li id="sec.268-ssec.5-para1.b" guid="_f9edf153-74f5-4130-bd29-2fc5ad82d6d3" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a later day stated in the owner’s notice.</txt></block></li></list></block></subclause></clause><clause id="sec.269" guid="_a19a1b50-f8af-4da7-ab3b-b82afd4967cd" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>269</no><heading id="sec.269-he" guid="_74c272b1-4c3a-486c-b188-0698e81f7d00">Responsibilities of owners of registered premises</heading><subclause id="sec.269-ssec.1" guid="_6f3d810e-5bf8-4ee6-8a23-42dac5c6deee" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to the owner of registered premises.</txt></block></subclause><subclause id="sec.269-ssec.2" guid="_54228002-eecd-4a7f-8593-41a6f593886c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">Within 20 business days after the premises are registered, the owner must ask the registrar of titles, by notice, to keep a record that this part applies to all lots within the affected area stated in the registration.</txt><penalty id="sec.269-ssec.2-pen" guid="_624ce316-54f4-4294-b9c7-74ccf86e83f4"><block status="uncommenced"><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></block></subclause><subclause id="sec.269-ssec.3" guid="_d524b0a5-d73a-4e3d-bb3a-cc1cb0837094" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">Within 20 business days after the premises are registered, the owner must—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.269-ssec.3-para1.a" guid="_0ac380e3-8d97-458b-909c-3621aa327918" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">publish a notice about the registration in a newspaper circulating generally in the affected area; and</txt></block></li><li id="sec.269-ssec.3-para1.b" guid="_f98b1c7b-91bd-4e7c-b2ac-75b86c67ac3c" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the owner has a website for the premises—publish details about the registration, and the levels of emissions allowed under the registration, on the website.</txt></block></li></list><penalty id="sec.269-ssec.3-pen" guid="_bcd591e7-36ad-4104-9741-b1c53916b0fb"><block status="uncommenced"><txt break.before="1">Maximum penalty—50 penalty units.</txt></block></penalty></block></subclause><subclause id="sec.269-ssec.4" guid="_46048b06-c0e1-4c6c-9ea1-0486c76df936" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">Within 20 business days after the registration of premises is renewed, the owner must publish a notice about the renewal in a newspaper circulating generally in the affected area.</txt><penalty id="sec.269-ssec.4-pen" guid="_4dcf59a4-e3b7-43da-b548-6326e198da3d"><block status="uncommenced"><txt break.before="1">Maximum penalty—50 penalty units.</txt></block></penalty></block></subclause><subclause id="sec.269-ssec.5" guid="_b0e03c56-a2be-4ef1-9ec7-16233ccb2431" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">As soon as practicable after complying with subsection (3) or (4), the owner must give notice of the compliance to the Minister.</txt><penalty id="sec.269-ssec.5-pen" guid="_2cf0b6d2-67e9-44d4-914b-b0a0777c4c6c"><block status="uncommenced"><txt break.before="1">Maximum penalty—20 penalty units.</txt></block></penalty></block></subclause><subclause id="sec.269-ssec.6" guid="_be324f08-818e-40c9-bfd8-039383c200d7" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">While the premises are registered, the owner must keep information about the registration, and the levels of emissions allowed under the registration, reasonably available for inspection, free of charge, by members of the public.</txt><penalty id="sec.269-ssec.6-pen" guid="_bc5c78e2-5258-47fa-92cf-6916638f0007"><block status="uncommenced"><txt break.before="1">Maximum penalty—50 penalty units.</txt></block></penalty></block></subclause><subclause id="sec.269-ssec.7" guid="_2faa04ad-b4ae-421a-aca7-b0874ed215de" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">As soon as practicable after a registration is cancelled or ends, the owner must give the registrar of titles a notice asking the registrar to remove the record made under subsection (2).</txt><penalty id="sec.269-ssec.7-pen" guid="_a0e48cc7-11d7-4e71-a0af-133059dedc43"><block status="uncommenced"><txt break.before="1">Maximum penalty—20 penalty units.</txt></block></penalty></block></subclause><subclause id="sec.269-ssec.8" guid="_41b83108-6c63-44eb-9234-44fa85f0bb79" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(8)</no><block status="uncommenced"><txt break.before="1">A notice given to the registrar of titles under this section must be in the form, and accompanied by any fee, required under the <legref jurisd="QLD" type="act" check="unknown">Land Title Act</legref>.</txt></block></subclause></clause><clause id="sec.270" guid="_e21c3e15-5277-45a2-bd34-6ee464ce314e" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>270</no><heading id="sec.270-he" guid="_cc6faae6-a9ac-44c3-b10c-5e06c91d18fe">Responsibilities of owners of affected premises</heading><subclause id="sec.270-ssec.1" guid="_b0790311-68b9-4ab8-a99e-cc0bf44f20c4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to the owner of premises, other than registered premises, in an affected area.</txt></block></subclause><subclause id="sec.270-ssec.2" guid="_6d9b33b0-9df5-4469-9849-52658ba5800c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The owner or the owner’s agent must, before entering into a lease of the premises with a person, give the person a notice that states—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.270-ssec.2-para1.a" guid="_d4927ec8-9bd4-4693-9c62-7b1d23f276e0" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the premises are in an affected area; and</txt></block></li><li id="sec.270-ssec.2-para1.b" guid="_6a6b307c-7261-46ea-91f2-be46deb710b6" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">that restrictions may apply to the person in taking proceedings about emissions from registered premises in the affected area.</txt></block></li></list><penalty id="sec.270-ssec.2-pen" guid="_416b312a-955f-4d61-86ed-7776bc64f691"><block status="uncommenced"><txt break.before="1">Maximum penalty—50 penalty units.</txt></block></penalty></block></subclause><subclause id="sec.270-ssec.3" guid="_9b404f0c-dd79-4f9e-ad92-532bb24c7179" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><txt break.before="1"><defterm id="sec.270-def.lease" guid="_fbeb2c56-908a-470b-96ab-31a8c16ca526" type="definition">lease</defterm> means an agreement under which the owner gives a person the right to occupy the premises in exchange for money or other valuable consideration.</txt></block></subclause></clause><clause id="sec.271" guid="_d4a329f9-6c58-4125-b18f-b7df22760f32" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>271</no><heading id="sec.271-he" guid="_e0b413f7-4364-41a0-b7d7-bbd03742d6d9">Responsibilities on development applicants</heading><subclause id="sec.271-ssec.1" guid="_32949dec-9030-4ea8-8f55-b67375e980f7" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to a person who makes an affected area development application for premises.</txt></block></subclause><subclause id="sec.271-ssec.2" guid="_eeadf479-7a29-46fe-8f19-163dba53b341" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">Within 20 business days after making the application, the person must give the registrar of titles a notice asking the registrar to keep a record that this part applies to the premises.</txt><penalty id="sec.271-ssec.2-pen" guid="_ca8241a1-a9b1-4d79-a17f-e0c83a183c88"><block status="uncommenced"><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></block></subclause><subclause id="sec.271-ssec.3" guid="_92d620e1-6459-4bf5-be49-ffdd153bc1cc" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">Within 20 business days after the application lapses, is refused or is withdrawn, the person must give the registrar of titles a notice asking the registrar to remove the record.</txt><penalty id="sec.271-ssec.3-pen" guid="_7d6f2cba-9157-424e-b028-c850a5e55b5c"><block status="uncommenced"><txt break.before="1">Maximum penalty—20 penalty units.</txt></block></penalty></block></subclause><subclause id="sec.271-ssec.4" guid="_270e4429-a451-4a28-8325-ccf6e0d85293" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">A notice given to the registrar of titles under this section must be in the form, and accompanied by any fee, required under the <legref jurisd="QLD" type="act" check="unknown">Land Title Act</legref>.</txt></block></subclause></clause><clause id="sec.272" guid="_28f187d0-e9fd-427a-a646-4a117e103aa4" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>272</no><heading id="sec.272-he" guid="_3b334215-b73a-4b02-a9b0-e9facda5cce4">Rights of buyers in Milton rail precinct</heading><subclause id="sec.272-ssec.1" guid="_0ef33571-b7b5-4959-b050-1d9a53850fe1" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.272-ssec.1-para1.a" guid="_16faedca-a817-4e45-9f6a-e35d1d3a5c1f" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the applicant for an affected area development application, for premises in the Milton rail precinct, enters into a contract with another person for the person (the <defterm id="sec.272-ssec.1-def.buyer" guid="_f1e87689-54e7-4e74-9412-5f4c68d8ea3c" type="definition">buyer</defterm>) to buy all or part of the premises; and</txt></block></li><li id="sec.272-ssec.1-para1.b" guid="_33e75174-2d0b-4203-ae44-0dae691cd6b9" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">when the contract is entered into, the record stated in section 271(2) is not shown on the appropriate register because the applicant failed to comply with that subsection.</txt></block></li></list></block></subclause><subclause id="sec.272-ssec.2" guid="_1d71f1b5-e137-47c5-be6e-ce6d5678664f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The buyer may, before the contract is completed, end the contract by giving the applicant or the applicant’s agent a signed and dated notice that states the contract is ended under this section.</txt></block></subclause><subclause id="sec.272-ssec.3" guid="_fc783b59-1fab-4ba2-9f50-6d1c4113dcef" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">Within 10 business days after the buyer ends the contract, the applicant must refund any deposit paid under the contract.</txt><penalty id="sec.272-ssec.3-pen" guid="_237919c4-a8a3-464a-b632-bff40f601696"><block status="uncommenced"><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></block></subclause><subclause id="sec.272-ssec.4" guid="_51fe7e20-e3e0-423a-b43b-599ed69245a5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">This section applies despite anything to the contrary in the contract.</txt></block></subclause></clause><clause id="sec.273" guid="_25a27761-9534-4dba-af8b-9416a8d2c6ba" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>273</no><heading id="sec.273-he" guid="_bbc2899a-35f9-47ba-b968-8b0296ed3331">Responsibilities of registrar of titles</heading><subclause id="sec.273-ssec.1" guid="_71a7c39d-049c-4380-bd25-53a60c7815e1" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The registrar of titles must, on receiving a notice under section 269(2) or 271(2), keep the record stated in the notice in a way that a search of the appropriate register will show the record.</txt></block></subclause><subclause id="sec.273-ssec.2" guid="_d6f5b29d-1e9f-4a47-bb36-6b602d1b4337" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The registrar of titles must, on receiving a notice under section 269(7) or 271(3), remove the record from the register.</txt></block></subclause><subclause id="sec.273-ssec.3" guid="_16624196-b4c7-4820-9420-2f359d684206" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The registrar of titles may remove a record under this part from a register if the registrar is satisfied, on reasonable grounds, that—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.273-ssec.3-para1.a" guid="_c6962e41-db47-4fa4-a245-e570daf29fd1" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the registration of the premises has expired or been cancelled; or</txt></block></li><li id="sec.273-ssec.3-para1.b" guid="_47987f9e-8457-4c82-988a-560102d047b7" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for an affected area development application—the application has lapsed, or been refused or withdrawn.</txt></block></li></list></block></subclause></clause><clause id="sec.274" guid="_96461a45-ebce-457b-9ecb-6a85eb71e9ec" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>274</no><heading id="sec.274-he" guid="_5fac2db3-5228-4ed2-bba7-f2826456f3b5">Restriction on legal proceedings</heading><subclause id="sec.274-ssec.1" guid="_36a6e0ed-a11e-4405-9982-04562b6036c3" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to an affected person’s claim that another person’s act or omission in carrying out an activity of a type stated in section 267(1)(a) at registered premises is, was or will be an unreasonable interference, or likely interference, with an environmental value.</txt></block></subclause><subclause id="sec.274-ssec.2" guid="_19ecac2c-30b1-4f55-91ee-a4656e18e093" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">Despite any other Act, the affected person may not take civil proceedings for nuisance, or criminal proceedings relating to a local law, against a person in relation to the claim if the following have been complied with for the act or omission—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.274-ssec.2-para1.a" guid="_5aa75b4c-7490-443d-93d4-1357e98f48c5" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the development approval for the registered premises;</txt></block></li><li id="sec.274-ssec.2-para1.b" guid="_72764294-291b-47ef-8151-1349b266d2a0" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">an environmental authority applying to the act or omission.</txt></block></li></list></block></subclause><subclause id="sec.274-ssec.3" guid="_7b71e5b4-4b59-4967-9c93-6e384ef4f240" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">However, this section does not apply if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.274-ssec.3-para1.a" guid="_cceb4fc0-4bee-4ecf-b1f1-36abb223819a" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a new or amended authority starts to apply for the registered premises; and</txt></block></li><li id="sec.274-ssec.3-para1.b" guid="_43610ba9-6dc9-4b2f-85ba-1ba9e2daf23d" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the new or amended authority authorises greater emissions than the original authority of the same type for the premises.</txt></block></li></list></block></subclause><subclause id="sec.274-ssec.4" guid="_ef71b932-8118-4b22-9ce7-d388da180e9b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.274-ssec.4-def.affectedperson_" guid="_adec7b51-1a37-4327-bffa-bfe5542c111d" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.274-ssec.4-def.affectedperson" guid="_757169c2-c014-402c-a2b5-b426ba5db76d" type="definition">affected person</defterm> means the owner, occupier or lessee of premises that are, or were, the subject of an affected area development application—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.274-ssec.4-def.affectedperson-para1.a" guid="_d2288a57-1e5e-4f8b-b910-c455118bcca3" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">made after the commencement; or</txt></block></li><li id="sec.274-ssec.4-def.affectedperson-para1.b" guid="_3303861c-9c58-4d49-b1d9-76ebd566238e" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">made before the commencement for which a decision notice had not been given before the commencement; or</txt></block></li><li id="sec.274-ssec.4-def.affectedperson-para1.c" guid="_29b41832-9699-41e5-9594-06828541dc5b" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">for premises for which—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.274-ssec.4-def.affectedperson-para1.c-para2.i" guid="_d7651b0b-2e06-4626-bd67-95fa948b390d" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a development approval has been given for the application before the commencement; and</txt></block></li><li id="sec.274-ssec.4-def.affectedperson-para1.c-para2.ii" guid="_29a25b50-faf6-4ed8-8666-d740a57e0be7" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">a certificate of classification had not been given under the <legref jurisd="QLD" type="act" check="unknown">Building Act</legref>, before the commencement.</txt></block></li></list></block></li></list></definition><definition id="sec.274-ssec.4-def.environmentalvalue_" guid="_c421eadc-26ac-4587-9e44-2fbbdd19d74b" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.274-ssec.4-def.environmentalvalue" guid="_ed33531c-bd1d-4dd9-a41d-2e9beeec3a41" type="definition">environmental value</defterm> means an environmental value under the <legref jurisd="QLD" type="act" check="unknown">Environmental Protection Act</legref>.</txt></definition><definition id="sec.274-ssec.4-def.neworamendedauthority_" guid="_49c74998-41d6-4b0d-b54c-b2f2daf00ff9" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.274-ssec.4-def.neworamendedauthority" guid="_efa54d7f-916c-4b54-958c-d4e1d7316468" type="definition">new or amended authority</defterm>, for registered premises, means—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.274-ssec.4-def.neworamendedauthority-para1.a" guid="_77aa8d8f-284f-4c3b-a78c-ac01d2145891" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a new development approval or a new environmental authority authorising the carrying out of an environmentally relevant activity under the <legref jurisd="QLD" type="act" check="unknown">Environmental Protection Act</legref> on the premises; or</txt></block></li><li id="sec.274-ssec.4-def.neworamendedauthority-para1.b" guid="_5f2dda63-39ac-425a-a664-5d8879114239" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">an amendment to the development approval for, or new environmental authority applying to, the premises; or</txt></block></li><li id="sec.274-ssec.4-def.neworamendedauthority-para1.c" guid="_9495d269-40e7-4c55-b949-55b6b4ba80f8" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">a new environmental authority applying to the premises; or</txt></block></li><li id="sec.274-ssec.4-def.neworamendedauthority-para1.d" guid="_e0573dc0-3ab9-4f38-b407-c53d99098504" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">an amendment to an environmental authority applying to the premises.</txt></block></li></list></definition><definition id="sec.274-ssec.4-def.originalauthority_" guid="_5f4410f6-2a09-42f6-8468-44268c171d5e" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.274-ssec.4-def.originalauthority" guid="_e3447631-21bb-4fa7-9a3b-59e36ba7d10b" type="definition">original authority</defterm>, for registered premises, means the following in effect when the premises were first registered—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.274-ssec.4-def.originalauthority-para1.a" guid="_5511af1d-86ec-42b8-a055-1261f3b4e7b9" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the registration;</txt></block></li><li id="sec.274-ssec.4-def.originalauthority-para1.b" guid="_64031bfa-473f-4fa1-b5b4-31798712c01f" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the development approval for the premises;</txt></block></li><li id="sec.274-ssec.4-def.originalauthority-para1.c" guid="_538bf1de-1099-4e6d-bf46-ad050adc080c" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">an environmental authority applying to the activity on the premises.</txt></block></li></list></definition></deflist></block></subclause></clause><clause id="sec.275" guid="_fc1c49f2-1533-48dd-94ce-92429dac69ce" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>275</no><heading id="sec.275-he" guid="_b159d769-ec2a-4801-9542-bb45226c0340">Regulation may prescribe matters</heading><block status="uncommenced"><txt break.before="1">A regulation may prescribe matters for this part, including—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.275-para1.a" guid="_188c8c32-5f03-4726-8a28-4fb09243eda6" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">requirements for an application to register premises; and</txt></block></li><li id="sec.275-para1.b" guid="_55071121-d5d8-4588-a855-e63018e2515a" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">processes for dealing with applications; and</txt></block></li><li id="sec.275-para1.c" guid="_4aa09167-b8e4-464f-8af1-6f97c48b0375" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">circumstances in which an application—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.275-para1.c-para2.i" guid="_e1f6fcca-abc0-418a-9ac5-2d2288d6131f" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">lapses; or</txt></block></li><li id="sec.275-para1.c-para2.ii" guid="_fb9bab9b-3429-460e-9447-77061d793110" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">is taken to have been withdrawn; or</txt></block></li><li id="sec.275-para1.c-para2.iii" guid="_a64b42f0-c7cb-4914-b82a-164f8360cc97" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">may be cancelled; and</txt></block></li></list></block></li><li id="sec.275-para1.d" guid="_4d5bd9e1-37f4-4b2c-ab72-a27dbcfef3cc" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">matters the Minister must assess an application against, or have regard to; and</txt></block></li><li id="sec.275-para1.e" guid="_5700e5ab-3c5e-4242-a1a3-773113857813" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">the content of, and procedure for giving, notices; and</txt></block></li><li id="sec.275-para1.f" guid="_b76df499-ec97-4311-bdfb-c9d5b5f6e69d" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">procedures for cancelling registrations or amending the conditions of a registration; and</txt></block></li><li id="sec.275-para1.g" guid="_1bd1c722-1a46-4f61-b159-53d7d3073c5c" status="uncommenced" provision.type="other"><no>(g)</no><block status="uncommenced"><txt break.before="1">the form in which information must be kept.</txt></block></li></list></block></clause></part><part id="ch.7-pt.5" guid="_4b4b9d88-e0bb-47a0-9a8f-4b2d1659d3d7" status="uncommenced" affected.by.uncommenced="0"><no>Part 5</no><heading id="ch.7-pt.5-he" guid="_f50c44ab-a78c-450f-9bd1-b0d37365bafd">Other provisions</heading><clause id="sec.276" guid="_4b5fc235-773c-4b07-a64a-245299301159" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>276</no><heading id="sec.276-he" guid="_f84defc3-05bc-45de-bf19-50c333c7ada2">Party houses</heading><subclause id="sec.276-ssec.1" guid="_740a9204-6e0d-4e09-b2e5-4abc28a2f71a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A planning scheme or TLPI for the local government area may do all or any of the following—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.276-ssec.1-para1.a" guid="_12010a3e-a45d-4c0e-9269-6dcfa0c84109" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">state that a material change of use for a party house is assessable development in all or part of the local government area;</txt></block></li><li id="sec.276-ssec.1-para1.b" guid="_95c10043-8a82-440e-abb0-4dee6498ce14" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">include assessment benchmarks for a material change of use for a party house;</txt></block></li><li id="sec.276-ssec.1-para1.c" guid="_c01e1d2c-b663-490b-87b8-b9fe45a93885" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">identify all or part of the local government area as a party house restriction area.</txt></block></li></list></block></subclause><subclause id="sec.276-ssec.2" guid="_b1434be2-1538-4b9c-b954-41ec94200a8c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The use of a residence as a party house, in a party house restriction area, is not, and has never been, a natural and ordinary consequence of a residential development.</txt></block></subclause><subclause id="sec.276-ssec.3" guid="_1637b28b-ae7a-4f9d-a57c-ae4b13a84130" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">Neither of the following authorises, or has ever authorised, a material change of use for a party house to take place as part of a residential development in a party house restriction area—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.276-ssec.3-para1.a" guid="_b275971a-c17e-48d2-9dd1-e40e532197b9" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a development permit for the residential development;</txt></block></li><li id="sec.276-ssec.3-para1.b" guid="_9a892e27-3448-4db7-b05d-7810dd75c488" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a planning scheme or TLPI that states residential development in the party house restriction area is accepted development.</txt></block></li></list></block></subclause><subclause id="sec.276-ssec.4" guid="_607f5495-0cfa-4bd1-a6bd-9fd4f90547de" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">Subsection (3) applies whether the development permit was given, or planning scheme or TLPI was made, before or after the commencement.</txt></block></subclause><subclause id="sec.276-ssec.5" guid="_25a02edd-7acf-44f8-bb8b-c8aed6b35d07" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.276-ssec.5-def.partyhouse_" guid="_36b5b8f9-33e4-4dbe-8394-bc917094d1bd" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.276-ssec.5-def.partyhouse" guid="_a8fbc649-e63c-46c4-8f59-a1c5cd29724d" type="definition">party house</defterm> means premises containing a dwelling that is used to provide, for a fee, accommodation or facilities for guests if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.276-ssec.5-def.partyhouse-para1.a" guid="_9d89b782-86a2-441d-a6ad-0fbdedd5e101" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">guests regularly use all or part of the premises for parties (bucks parties, hens parties, raves, or wedding receptions, for example); and</txt></block></li><li id="sec.276-ssec.5-def.partyhouse-para1.b" guid="_b6ca9df2-9a9e-4405-975c-8109e18a815e" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the accommodation or facilities are provided for a period of less than 10 days; and</txt></block></li><li id="sec.276-ssec.5-def.partyhouse-para1.c" guid="_6015851f-583c-4ea8-96f9-dcddb07cad77" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the owner of the premises does not occupy the premises during that period.</txt></block></li></list></definition><definition id="sec.276-ssec.5-def.residence_" guid="_60bb9b28-0c41-48c9-bb38-7b3761c0cbf7" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.276-ssec.5-def.residence" guid="_82a37530-bee7-4a17-bb5b-4910cb746a16" type="definition">residence</defterm> means premises used for a self-contained residence that is—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.276-ssec.5-def.residence-para1.a" guid="_e1edf7c1-2af1-4816-bf9f-e97cb2a8c543" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a dual occupancy; or</txt></block></li><li id="sec.276-ssec.5-def.residence-para1.b" guid="_a92f99c5-a392-452c-b3e1-764df635dcc7" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a dwelling house; or</txt></block></li><li id="sec.276-ssec.5-def.residence-para1.c" guid="_c1425d17-6a20-492d-9d51-64a6778258dc" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">a dwelling unit; or</txt></block></li><li id="sec.276-ssec.5-def.residence-para1.d" guid="_034ed3eb-dbf9-4b02-bfb8-2ea3e236529c" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">a multiple dwelling.</txt></block></li></list></definition><definition id="sec.276-ssec.5-def.residentialdevelopment_" guid="_08ffba29-5b30-4b49-a00d-40ae92884487" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.276-ssec.5-def.residentialdevelopment" guid="_d2adb3e6-127a-4768-8037-713eca2030e0" type="definition">residential development</defterm> means a material change of use for a residence.</txt></definition></deflist></block></subclause></clause><clause id="sec.277" guid="_523aa1bd-cdc2-47d3-9d78-25bdab3e8947" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>277</no><heading id="sec.277-he" guid="_6bba185c-2bbe-441d-8105-9adcaac51748">Assessment and decision rules for particular State heritage places</heading><subclause id="sec.277-ssec.1" guid="_77e2df01-5040-46a0-b3c6-8cc2818ab13b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.277-ssec.1-para1.a" guid="_18145559-8fed-4a64-8960-fad99ec206d1" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the chief executive is—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.277-ssec.1-para1.a-para2.i" guid="_7d30f148-a2b0-4038-a3b2-21b3fd9fc48b" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">an assessment manager, or a referral agency, for a development application; or</txt></block></li><li id="sec.277-ssec.1-para1.a-para2.ii" guid="_d6c9f122-c7c9-450f-b819-c74a4d5b109a" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">a responsible entity for a change application; and</txt></block></li></list></block></li><li id="sec.277-ssec.1-para1.b" guid="_7e3b2304-eb21-4957-9217-1b352fdb97c1" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the development involves a State heritage place; and</txt></block></li><li id="sec.277-ssec.1-para1.c" guid="_2b1d7107-c29a-4c9c-8768-092df1ae7a07" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the chief executive is satisfied the development would destroy or substantially reduce the cultural heritage significance of the State heritage place, including—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.277-ssec.1-para1.c-para2.i" guid="_54cbc0eb-4585-49f8-a498-775484a65b06" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">by demolishing all elements or features of the place that contribute to the place’s cultural heritage significance described in the place’s entry in the Queensland heritage register; and</txt></block></li><li id="sec.277-ssec.1-para1.c-para2.ii" guid="_55c7bf5e-c500-4383-a6a8-4a63bf304abc" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">by changing the place so that the place no longer satisfies any of the criteria for entry in the Queensland heritage register.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.277-ssec.2" guid="_7abaf351-bfdb-4121-a7bf-794c346659da" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The chief executive must do the following before deciding the application or giving a referral agency’s response about the application—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.277-ssec.2-para1.a" guid="_bf393439-f681-42d8-bdcc-690cf5a90ec2" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">refer the application to the Queensland Heritage Council;</txt></block></li><li id="sec.277-ssec.2-para1.b" guid="_7f903fe6-6963-4733-b489-88cead7b9d3e" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">have regard to any advice the Queensland Heritage Council gives the chief executive, within the time allowed under this Act for the chief executive to decide the application or give the response.</txt></block></li></list></block></subclause><subclause id="sec.277-ssec.3" guid="_afcab9b4-ab32-4ec7-aae6-05abc9431e17" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">Unless the State heritage place is an archaeological State heritage place, the chief executive must also have regard to whether there is a prudent or feasible alternative to carrying out the development, when deciding the application or giving the referral response.</txt></block></subclause><subclause id="sec.277-ssec.4" guid="_30187918-0269-400d-acd2-9633e3fe3594" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">For subsection (3), an alternative is not a prudent or feasible alternative if the alternative involves—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.277-ssec.4-para1.a" guid="_6762356e-f412-46ee-a9b4-3c00144b9c17" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">an extraordinary economic cost to the State, all or part of a community, or an individual; or</txt></block></li><li id="sec.277-ssec.4-para1.b" guid="_6aa1393f-5abe-4cf1-8538-20e6763f0789" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">an extraordinary environmental or social disadvantage; or</txt></block></li><li id="sec.277-ssec.4-para1.c" guid="_e279b93a-6509-473b-bd6e-475be42bdbf4" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">a risk to public health or safety; or</txt></block></li><li id="sec.277-ssec.4-para1.d" guid="_970b7feb-a90f-4ff7-863d-82a1f131e947" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">another extraordinary or unique circumstance.</txt></block></li></list></block></subclause><subclause id="sec.277-ssec.5" guid="_fcd58e40-d858-4b2e-a15c-84af089939f0" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.277-ssec.5-def.archaeologicalStateheritageplace_" guid="_d30031aa-e0c9-4f9e-bf5d-ed06b948f8b2" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.277-ssec.5-def.archaeologicalStateheritageplace" guid="_c13bace0-bf62-45ce-9e76-e5e0e7e50cd0" type="definition">archaeological State heritage place</defterm> see the Heritage Act, schedule.</txt></definition><definition id="sec.277-ssec.5-def.QueenslandHeritageCouncil_" guid="_60db7143-767f-4420-9b4f-dc7c315255a0" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.277-ssec.5-def.QueenslandHeritageCouncil" guid="_91628b71-dfaa-41f6-b691-ee20af122713" type="definition">Queensland Heritage Council</defterm> means the Queensland Heritage Council established under the Heritage Act.</txt></definition><definition id="sec.277-ssec.5-def.Queenslandheritageregister_" guid="_af9c19f9-9e93-41b7-965e-50de1edf5cd0" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.277-ssec.5-def.Queenslandheritageregister" guid="_4e09e847-2c63-4280-839d-f654d6e160d8" type="definition">Queensland heritage register</defterm> see the Heritage Act, schedule.</txt></definition></deflist></block></subclause></clause><clause id="sec.278" guid="_34a4eb69-1ceb-455e-a602-67fa69458fed" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>278</no><heading id="sec.278-he" guid="_bef42c46-7ce5-4624-a830-13ffa8af8679">Application of P&#38;E Court Act evidentiary provisions</heading><block status="uncommenced"><txt break.before="1">The P&#38;E Court Act, part 5, division 2 also applies to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.278-para1.a" guid="_05c2e5a7-fc7c-4d0f-affc-8c1d1a059a07" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">proceedings relating to this Act started in a court other than the P&#38;E Court or in a tribunal; and</txt></block></li><li id="sec.278-para1.b" guid="_e5d09503-fa5d-438a-a680-00d630a4dc46" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a person acting judicially in relation to proceedings relating to this Act.</txt></block></li></list></block></clause><clause id="sec.279" guid="_c788c2a2-9385-4ee0-bc90-b15d8dcdc7c1" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>279</no><heading id="sec.279-he" guid="_6ec0c3a6-db4f-4160-a924-6413f9771633">Electronic service</heading><subclause id="sec.279-ssec.1" guid="_b4abad3c-52a2-42dc-b980-4d7a1d110d3c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if a person receives a document from another person that states an electronic address for service.</txt><note id="sec.279-ssec.1-note" guid="_a0920e25-c905-4699-85b2-2a3c57d5cd00" type="example"><heading id="sec.279-ssec.1-note-he" guid="_62f55456-fd93-42c6-a8f6-9e32a7b3e92b">Examples of an electronic address—</heading><block status="uncommenced"><txt break.before="1">an email address, internet protocol address or digital mailbox address</txt></block></note></block></subclause><subclause id="sec.279-ssec.2" guid="_69ea904e-2a33-44fc-ae64-bc23ab325b65" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The person may serve a document on the other person by electronically transmitting the following (the <defterm id="sec.279-def.communication" guid="_5fff2af3-d70f-4583-b272-9567fc7b2b52" type="definition">communication</defterm>) to the electronic address—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.279-ssec.2-para1.a" guid="_ef775f84-50e5-40b8-b1fe-9180c28aee14" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the document; or</txt></block></li><li id="sec.279-ssec.2-para1.b" guid="_20579675-c565-4108-b6bf-a96d10bc47b1" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a message stating that the document is available for the other person to read by opening a stated hyperlink.</txt></block></li></list></block></subclause><subclause id="sec.279-ssec.3" guid="_ab16dd26-a545-45d2-b739-ab5f19dd21c2" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The other person is taken to have been served with the document under subsection (2)(b) if the document was able to be read by opening the hyperlink—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.279-ssec.3-para1.a" guid="_5f94d80e-1634-4b44-9c42-58ab2e314fe6" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">at the time (the <defterm id="sec.279-ssec.3-def.sendingtime" guid="_6816850f-bb94-478c-9634-25f45dc705ed" type="definition">sending time</defterm>) when the communication was transmitted; and</txt></block></li><li id="sec.279-ssec.3-para1.b" guid="_853126d8-daf3-4933-9336-3404848196f3" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for a period after the sending time that, in the circumstances, was reasonable to allow the other person to open the hyperlink and read or copy the document.</txt></block></li></list></block></subclause><subclause id="sec.279-ssec.4" guid="_fe77cbe9-055a-4ca2-9591-8502da6dea4a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">When deciding what is a reasonable period for subsection (3)(b), regard must be had to the other person’s functions under this Act for the document.</txt></block></subclause><subclause id="sec.279-ssec.5" guid="_567acb6e-d35f-4b78-bf47-446711e000dc" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">Subsection (3) applies whether or not the other person opened the hyperlink.</txt></block></subclause><subclause id="sec.279-ssec.6" guid="_6572820f-0f42-46c1-aea9-537bdc8c2c1b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">In any civil or criminal proceedings, a certificate of service that states the following matters is evidence of those matters—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.279-ssec.6-para1.a" guid="_ca0471f2-de4e-4cae-8b36-aa5bca9ba381" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the sending time;</txt></block></li><li id="sec.279-ssec.6-para1.b" guid="_8dd794db-f0d6-4bad-b5c9-31cdc3ff0dd0" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">that the document was able to be read at the hyperlinked address at the sending time and for a stated period after that time.</txt></block></li></list></block></subclause><subclause id="sec.279-ssec.7" guid="_6a84c091-0b5e-4f87-bdb5-1738b26376b4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">This section does not limit the <legref jurisd="QLD" type="act" check="unknown">Interpretation Act</legref>, section 39 or the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Electronic Transactions (Queensland) Act 2001</name></legref>.</txt><note id="sec.279-ssec.7-note" guid="_7f58d08c-7de9-4e90-9fb7-3607e8ebc395" type="example"><heading id="sec.279-ssec.7-note-he" guid="_a0300c81-bdca-404f-b4f6-15b8f4c9ecf5">Note—</heading><block status="uncommenced"><txt break.before="1">In an approved form, a person consents to a particular—</txt><list number.type="alpha-lc" unnumbered.indent="0"><li id="sec.279-ssec.7-note-para1.a" guid="_47ea83c3-c71a-453e-b3d3-cbdbb665b7c1" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">type of electronic communication for service from the applicant to the person for the application; and</txt></block></li><li id="sec.279-ssec.7-note-para1.b" guid="_d4e375dc-157b-42a6-96aa-0c589ee404f0" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">method for electronic signatures for the communication.</txt></block></li></list><txt break.before="1">The <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Electronic Transactions (Queensland) Act 2001</name></legref>, sections 11 and 12 (about requirements and permissions to give information in writing) and 14 (about electronic signatures) will apply for the communication.</txt></block></note></block></subclause><subclause id="sec.279-ssec.8" guid="_30cb0934-cd45-404f-ab04-2ced8205d642" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(8)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.279-ssec.8-def.certificateofservice_" guid="_c963aad3-afee-4acf-8fab-bf9fcc6960eb" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.279-ssec.8-def.certificateofservice" guid="_16ed98ea-65b5-4c5d-8de4-77f2a2e981a1" type="definition">certificate of service</defterm> means a certificate that—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.279-ssec.8-def.certificateofservice-para1.a" guid="_93c99e89-9fed-4dc4-80b2-b224666a9352" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">is signed by the person who transmitted the communication; and</txt></block></li><li id="sec.279-ssec.8-def.certificateofservice-para1.b" guid="_bb78d4a7-7234-4430-908f-fde0eda8c41b" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">attaches a copy of the communication.</txt></block></li></list></definition></deflist></block></subclause></clause><clause id="sec.280" guid="_26b0a00b-8fe3-4f40-9894-e5f9f0baeb58" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>280</no><heading id="sec.280-he" guid="_180ea673-1f36-4126-884a-9a16d6a5da97">References in Act to particular terms</heading><block status="uncommenced"><txt break.before="1">In this Act, a reference to a person or thing stated in column 1 of the following table is, unless the contrary intention appears, a reference to the person or thing stated in column 2—</txt><table frame="all" colsep="0" rowsep="1" orient="port" id="sec.280-tbl" guid="_d44cabf9-2eff-4608-a872-fe19391f7ff0" heading.align="left" font.size="12.pt"><tgroup cols="2" colsep="0" rowsep="1" tgroupstyle="Unruled3column"><colspec colnum="1" colname="1" colwidth="2.500in" colsep="0"/><colspec colnum="2" colname="2" colwidth="2.500in" colsep="1"/><thead><row rowsep="1" id="sec.280-tbl-tblh-tblr" guid="_2a80e15d-af6e-4703-af61-8ffdf8495aa4"><entry colname="1" id="sec.280-tbl-tblh-tblr-tble1" guid="_115a573b-9c78-4dc8-b2cf-3c07fef41a51"><block status="uncommenced"><txt break.before="1">Column 1</txt></block></entry><entry colname="2" id="sec.280-tbl-tblh-tblr-tble2" guid="_afa299b4-746a-4f51-8e33-eef80a7f49d4"><block status="uncommenced"><txt break.before="1">Column 2</txt></block></entry></row></thead><tbody><row rowsep="1" id="sec.280-tbl-tblr" guid="_a6fca373-5d5e-4712-b921-fe79647a1aaa"><entry namest="1" nameend="2" id="sec.280-tbl-tblr-tble1" guid="_e483375b-9d7c-48aa-9154-f11cf8a21b78"><block status="uncommenced"><txt break.before="1">For a development application—</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.2" guid="_c0eb4930-0cf2-4eb8-8700-e1a13948b8cd"><entry colname="1" id="sec.280-tbl-tblr-oc.2-tble1" guid="_89e4b633-392a-4233-8910-4df746404f5f"><block status="uncommenced"><txt break.before="1">the applicant</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.2-tble2" guid="_c8e5ba5b-09a4-4a76-b850-76d9e9dc3832"><block status="uncommenced"><txt break.before="1">the applicant for the application</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.3" guid="_e7b18a65-c9a2-46e5-8dd6-01adfbf72d9d"><entry colname="1" id="sec.280-tbl-tblr-oc.3-tble1" guid="_1f552a56-d633-48e9-a96f-80255bc103c6"><block status="uncommenced"><txt break.before="1">the development</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.3-tble2" guid="_d7f1803d-9ca4-4666-995c-b8619821fad4"><block status="uncommenced"><txt break.before="1">the development that is the subject of the application</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.4" guid="_1adaea9e-af59-4f38-9a30-ccb2d33ba7cb"><entry colname="1" id="sec.280-tbl-tblr-oc.4-tble1" guid="_c1ba5759-9b63-4db6-915e-7240cf0b9577"><block status="uncommenced"><txt break.before="1">the assessment manager</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.4-tble2" guid="_ddaa5798-d3e0-4e40-9c16-2d6f37545106"><block status="uncommenced"><txt break.before="1">the assessment manager for the application</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.5" guid="_b5eae2c5-ee3a-424f-9065-9a3df8c6ce9e"><entry colname="1" id="sec.280-tbl-tblr-oc.5-tble1" guid="_635f1ef8-5f97-4918-ba8d-54bff7943b71"><block status="uncommenced"><txt break.before="1">the referral agency</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.5-tble2" guid="_a89b803c-d84b-4c64-a093-547224868314"><block status="uncommenced"><txt break.before="1">the referral agency for the application</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.6" guid="_3fe33515-7360-4baf-bacd-cf982f1c1a83"><entry colname="1" id="sec.280-tbl-tblr-oc.6-tble1" guid="_498eb017-4cb6-40a5-95bd-f322900734ae"><block status="uncommenced"><txt break.before="1">the local government</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.6-tble2" guid="_a830bf66-89c8-4a85-b045-33e8fd0988d0"><block status="uncommenced"><txt break.before="1">each local government for the local government area where the development is proposed</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.7" guid="_81bb3579-c1eb-4958-bc86-153772a3596f"><entry colname="1" id="sec.280-tbl-tblr-oc.7-tble1" guid="_9eef5a53-f858-4551-b59d-4cbdbe25e0bd"><block status="uncommenced"><txt break.before="1">a referral agency’s response</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.7-tble2" guid="_637cbc4c-5602-4beb-a7d6-5045d7f762b4"><block status="uncommenced"><txt break.before="1">a referral agency’s response for the application</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.8" guid="_a9817985-5216-4bd2-bcb7-f4081bf2bea5"><entry colname="1" id="sec.280-tbl-tblr-oc.8-tble1" guid="_7bdeff5a-8a4e-49f0-9302-f44cee778999"><block status="uncommenced"><txt break.before="1">the development approval</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.8-tble2" guid="_58dac1ea-4027-4085-a0ed-3fbd3a1eaa68"><block status="uncommenced"><txt break.before="1">the development approval for the application</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.9" guid="_3a3bd50e-d097-434f-a416-7afe154f451a"><entry colname="1" id="sec.280-tbl-tblr-oc.9-tble1" guid="_28b60bbe-94f7-4e7d-822f-6f8d0e569d6d"><block status="uncommenced"><txt break.before="1">the land</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.9-tble2" guid="_d51abb02-5de3-4cc1-b36a-69060e7c3a09"><block status="uncommenced"><txt break.before="1">the land that is the subject of the application</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.10" guid="_ae9aa12c-f23d-4986-a305-eeabb9611533"><entry colname="1" id="sec.280-tbl-tblr-oc.10-tble1" guid="_7383ff54-8a25-4733-afdb-7c7fcb4cd1e0"><block status="uncommenced"><txt break.before="1">the premises</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.10-tble2" guid="_eb1e10c1-1ccb-4594-a727-759dc31c619d"><block status="uncommenced"><txt break.before="1">the premises that are the subject of the application</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.11" guid="_b2e998bc-d9de-4765-8dbb-f097036b4cc4"><entry colname="1" id="sec.280-tbl-tblr-oc.11-tble1" guid="_27995caf-a946-4122-a808-b8d0e0b46984"><block status="uncommenced"><txt break.before="1">the planning scheme</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.11-tble2" guid="_b2f19dce-3775-4da1-b34f-d819fddb0388"><block status="uncommenced"><txt break.before="1">the planning scheme for the local government area where the development is proposed</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.12" guid="_13f4f45b-5cbf-4cd4-835f-0e182fcd5dc9"><entry colname="1" id="sec.280-tbl-tblr-oc.12-tble1" guid="_625b8757-691a-46ac-bf29-b5bd01042232"><block status="uncommenced"><txt break.before="1">a submitter</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.12-tble2" guid="_f9bd5701-6034-4c2f-8b80-c852f6923ec9"><block status="uncommenced"><txt break.before="1">a submitter for the application</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.13" guid="_59436c8e-7449-439c-ba14-5b0387be1196"><entry colname="1" id="sec.280-tbl-tblr-oc.13-tble1" guid="_a2909f07-37ff-48ce-a8fe-6706727206b2"><block status="uncommenced"><txt break.before="1">the decision notice</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.13-tble2" guid="_0c3a5003-72f9-4844-82d6-8b36c0bdca17"><block status="uncommenced"><txt break.before="1">the decision notice for the application</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.14" guid="_ba013b48-0ae4-4730-a89a-b45bca67b834"><entry namest="1" nameend="2" id="sec.280-tbl-tblr-oc.14-tble1" guid="_3fd5ea40-1abd-4068-b79f-0be8e8927637"><block status="uncommenced"><txt break.before="1">For a development approval—</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.15" guid="_53466c8d-e20f-4fc4-9411-4d690eaf4376"><entry colname="1" id="sec.280-tbl-tblr-oc.15-tble1" guid="_1a5b0d64-c218-4208-90b4-f6ea81cbf8a0"><block status="uncommenced"><txt break.before="1">the development application</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.15-tble2" guid="_31eb79a2-a8cf-4b26-8c2d-9a7ebac72026"><block status="uncommenced"><txt break.before="1">the development application for the approval</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.16" guid="_51a38a1d-1841-4928-9972-6a7c0a20e432"><entry colname="1" id="sec.280-tbl-tblr-oc.16-tble1" guid="_777c6da1-4754-49e4-9349-8816855516ad"><block status="uncommenced"><txt break.before="1">the applicant</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.16-tble2" guid="_46915323-8bde-43af-ba7b-c502a488559d"><block status="uncommenced"><txt break.before="1">the person who applied for the approval or a person in whom the benefit of the approval vests</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.17" guid="_c0c252c1-4063-422e-9fe7-7165dc84a31d"><entry colname="1" id="sec.280-tbl-tblr-oc.17-tble1" guid="_ad7f9bf5-3b58-464f-8892-d2a50ea63275"><block status="uncommenced"><txt break.before="1">the development</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.17-tble2" guid="_254375a6-5e25-441a-8f65-652ed8e6a048"><block status="uncommenced"><txt break.before="1">the development that is the subject of the approval</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.18" guid="_631dcff8-259f-4bfb-b100-d85733352561"><entry colname="1" id="sec.280-tbl-tblr-oc.18-tble1" guid="_88a869c1-3540-4d77-86e5-9e6b2b44d2bc"><block status="uncommenced"><txt break.before="1">the assessment manager</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.18-tble2" guid="_7da037df-5669-4a65-b1a9-0e92639f2ebc"><block status="uncommenced"><txt break.before="1">the assessment manager for the development application for the approval</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.19" guid="_8e61e267-4fcf-4809-a41e-85e532621e3c"><entry colname="1" id="sec.280-tbl-tblr-oc.19-tble1" guid="_937f17b6-c6b2-4275-89b0-03fbebd04b7a"><block status="uncommenced"><txt break.before="1">a referral agency</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.19-tble2" guid="_8569fc5c-48ca-4400-9096-592a14a0e1d2"><block status="uncommenced"><txt break.before="1">a referral agency for the development application for the approval</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.20" guid="_838bb6de-6857-4c71-9d73-d0c958bb76ee"><entry colname="1" id="sec.280-tbl-tblr-oc.20-tble1" guid="_3f966fad-dad8-4ca1-a352-fe0ba4260ed6"><block status="uncommenced"><txt break.before="1">the land</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.20-tble2" guid="_2de0dc35-9cf9-4d7a-b99b-deb1e967d7b4"><block status="uncommenced"><txt break.before="1">the land that is the subject of the approval</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.21" guid="_89aee1a9-86fd-4ca4-9eab-e04858a84e4d"><entry colname="1" id="sec.280-tbl-tblr-oc.21-tble1" guid="_99f70544-a6e1-4555-9d85-fdc690260a0c"><block status="uncommenced"><txt break.before="1">the premises</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.21-tble2" guid="_33e75ecf-c432-4a36-baaa-bee184ba34c6"><block status="uncommenced"><txt break.before="1">the premises that are the subject of the approval</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.22" guid="_7dc887e0-4d33-4a80-82b4-74c35b8fb0e1"><entry colname="1" id="sec.280-tbl-tblr-oc.22-tble1" guid="_38da426b-72e8-424f-91e4-d86b3c06ee71"><block status="uncommenced"><txt break.before="1">the local government</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.22-tble2" guid="_0ff78a8d-4162-4091-a966-928e25a0f8e0"><block status="uncommenced"><txt break.before="1">the local government for the local government area where the development is located</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.23" guid="_dce1e3ab-be00-42d3-966b-1569bb8704aa"><entry colname="1" id="sec.280-tbl-tblr-oc.23-tble1" guid="_c8c330d8-c2c2-46e4-9cc3-462755881580"><block status="uncommenced"><txt break.before="1">a development condition</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.23-tble2" guid="_d42fdb24-9e99-4c9a-bae6-c26f2c7cf330"><block status="uncommenced"><txt break.before="1">a development condition imposed on the development approval</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.24" guid="_c578e983-8173-4490-a8f5-d68eac13c047"><entry namest="1" nameend="2" id="sec.280-tbl-tblr-oc.24-tble1" guid="_30ca23b8-13ac-42d3-8faf-8f1b0e9cabe3"><block status="uncommenced"><txt break.before="1">For a development condition—</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.25" guid="_bf1b9f4a-6454-41ce-b34b-459ab7d06303"><entry colname="1" id="sec.280-tbl-tblr-oc.25-tble1" guid="_138a9528-0b65-4584-8e7a-859fe42ec33a"><block status="uncommenced"><txt break.before="1">the development approval</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.25-tble2" guid="_2d5a97e8-6054-459b-9bf4-76ef69001873"><block status="uncommenced"><txt break.before="1">the development approval in which the condition is included</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.26" guid="_4ceb5f9b-739e-42f8-aed2-2cda91e4185b"><entry colname="1" id="sec.280-tbl-tblr-oc.26-tble1" guid="_103ac9e0-602d-4fe0-8dcc-45fec18ba15a"><block status="uncommenced"><txt break.before="1">the development</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.26-tble2" guid="_3f5f475e-fe36-4f76-a7c4-877ee6690657"><block status="uncommenced"><txt break.before="1">the development that is the subject of the development approval in which the condition is included</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.27" guid="_d6d9710e-cdb4-41d8-804d-5bc51ebf0930"><entry colname="1" id="sec.280-tbl-tblr-oc.27-tble1" guid="_596acbe7-d868-4d2d-9689-17fe5b518c6d"><block status="uncommenced"><txt break.before="1">the land</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.27-tble2" guid="_1f476a91-2e7f-45ea-a921-9d813651d8b2"><block status="uncommenced"><txt break.before="1">the land that is the subject of the development approval in which the condition is included</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.28" guid="_cb9b8757-513f-4907-8e7d-f79d8f9b26c5"><entry colname="1" id="sec.280-tbl-tblr-oc.28-tble1" guid="_51146d26-8bea-4cff-97a7-9fce0eb892c0"><block status="uncommenced"><txt break.before="1">the premises</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.28-tble2" guid="_354c69cb-8fef-4936-887e-116e22970cda"><block status="uncommenced"><txt break.before="1">the premises that are the subject of the development approval in which the condition is included</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.29" guid="_5e195dfa-19a5-4fa2-966e-d9ec75432ba0"><entry namest="1" nameend="2" id="sec.280-tbl-tblr-oc.29-tble1" guid="_85b62b22-8ab0-489e-a4ec-c6a180e4304f"><block status="uncommenced"><txt break.before="1">For a call in, or proposed call in—</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.30" guid="_19000d79-2edd-4379-94e4-420ecd70f737"><entry colname="1" id="sec.280-tbl-tblr-oc.30-tble1" guid="_a1399ffc-5d58-4413-a070-dd25fa3295a4"><block status="uncommenced"><txt break.before="1">the application</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.30-tble2" guid="_1f0cfc0a-aa4d-409b-b84f-6624c8c2a575"><block status="uncommenced"><txt break.before="1">the application that is the subject of the call in or proposed call in</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.31" guid="_1ad74e74-721f-46fe-a77f-265718cae610"><entry namest="1" nameend="2" id="sec.280-tbl-tblr-oc.31-tble1" guid="_d416f665-3fb9-4de7-bdd4-c7de1132359c"><block status="uncommenced"><txt break.before="1">For change representations or a change application, cancellation application or extension application—</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.32" guid="_f96d6a9f-1248-4ce8-ad1f-931e2e2121fa"><entry colname="1" id="sec.280-tbl-tblr-oc.32-tble1" guid="_1196ea3d-413e-4093-866c-719cec540f18"><block status="uncommenced"><txt break.before="1">the applicant</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.32-tble2" guid="_1288a782-cc27-44cc-949e-8b5826959e74"><block status="uncommenced"><txt break.before="1">the person who made the application</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.33" guid="_3c288c80-3c04-473b-a3b4-8650be6b7fe9"><entry colname="1" id="sec.280-tbl-tblr-oc.33-tble1" guid="_c233b3f9-f839-4cd7-ac5d-fe53018238ed"><block status="uncommenced"><txt break.before="1">the assessment manager</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.33-tble2" guid="_de37addb-ec6c-4ab0-b589-10577cda2df1"><block status="uncommenced"><tlist number.type="default"><tli id="sec.280-tbl-tblr-oc.33-tble2-para1.a" guid="_8d423545-cc6c-4693-a115-83def6250690"><no>(a)</no><block status="uncommenced"><txt break.before="1">if the assessment manager for the development application was a chosen assessment manager, and the applicant is unable to make the application to the chosen assessment manager—the prescribed assessment manager; or</txt></block></tli><tli id="sec.280-tbl-tblr-oc.33-tble2-para1.b" guid="_4bd4ccc5-c86a-4b3e-98b9-b587a2b95c49"><no>(b)</no><block status="uncommenced"><txt break.before="1">otherwise—the assessment manager for the development application to which the application relates.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.34" guid="_cb36cedd-eeac-4969-bd9e-25c7f1be3c2e"><entry colname="1" id="sec.280-tbl-tblr-oc.34-tble1" guid="_bf6abf60-42fc-4fab-9969-7dbcc39a20e7"><block status="uncommenced"><txt break.before="1">the development approval</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.34-tble2" guid="_4581b6bc-6707-4727-8458-5bc68d205243"><block status="uncommenced"><txt break.before="1">the development approval that is the subject of the application</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.35" guid="_08dea34f-6c9e-471d-9406-6d454cd7e069"><entry colname="1" id="sec.280-tbl-tblr-oc.35-tble1" guid="_999a0306-d1aa-4b2e-8bda-afe58cb08f4e"><block status="uncommenced"><txt break.before="1">a referral agency</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.35-tble2" guid="_425eab45-a258-4d97-97af-4f2888e9e25a"><block status="uncommenced"><txt break.before="1">a referral agency for the development approval that is the subject of the application</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.36" guid="_6ab5d49f-272a-4728-8a02-d8015158e457"><entry namest="1" nameend="2" id="sec.280-tbl-tblr-oc.36-tble1" guid="_f020b3eb-28d1-4ada-bd44-6f7dafb76005"><block status="uncommenced"><txt break.before="1">For an enforcement notice or proposed enforcement notice—</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.37" guid="_682f3771-ebb8-4221-8822-5d38da1c2cb5"><entry colname="1" id="sec.280-tbl-tblr-oc.37-tble1" guid="_65f995c9-627c-495f-a008-075576c37331"><block status="uncommenced"><txt break.before="1">the enforcement authority</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.37-tble2" guid="_dcf56e57-61ab-4b27-94e2-e4fa693e49c9"><block status="uncommenced"><txt break.before="1">the enforcement authority giving or proposing to give the notice</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.38" guid="_ad47fe9c-6087-475f-87a3-dc69a49ce6c6"><entry namest="1" nameend="2" id="sec.280-tbl-tblr-oc.38-tble1" guid="_1bf3c3ea-0405-4edd-bdb8-b5d6dcb35528"><block status="uncommenced"><txt break.before="1">For an infrastructure charge, adopted charge, infrastructure charges notice or levied charge (a <defterm id="sec.280-tbl-tblr-oc.38-def.chargematter" guid="_e7fc0c55-4703-4c3e-a45c-da9b830500b0" type="definition">charge matter</defterm>)—</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.39" guid="_766ee8eb-6378-4049-8183-bedc48b811a4"><entry colname="1" id="sec.280-tbl-tblr-oc.39-tble1" guid="_04993675-cfaa-46de-9368-17fe0b89e194"><block status="uncommenced"><txt break.before="1">the applicant</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.39-tble2" guid="_30f0c955-3a37-4dfb-af36-62af357e0bbe"><block status="uncommenced"><txt break.before="1">the applicant for the development approval, approval for the extension application, or approval for the change application, to which the charge matter relates</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.40" guid="_c7e429d5-912d-45af-bf8f-a635826271b8"><entry colname="1" id="sec.280-tbl-tblr-oc.40-tble1" guid="_0a9c12d2-b750-4eac-b431-55b4382ec876"><block status="uncommenced"><txt break.before="1">the development</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.40-tble2" guid="_9b3badb9-513a-4239-b189-e82b4d8c736e"><block status="uncommenced"><txt break.before="1">the development that is the subject of the development approval to which the charge matter relates</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.41" guid="_98574e4f-48bf-45af-bb1f-575668c306ac"><entry colname="1" id="sec.280-tbl-tblr-oc.41-tble1" guid="_ff687245-7821-4692-969f-b4f0182044a9"><block status="uncommenced"><txt break.before="1">the premises</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.41-tble2" guid="_e6198f49-29e4-4cf0-b05d-ee203b93dad4"><block status="uncommenced"><txt break.before="1">the premises to which the charge attaches</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.42" guid="_e8533dd7-24d7-4ddc-b97e-a10db7f5aab0"><entry colname="1" id="sec.280-tbl-tblr-oc.42-tble1" guid="_8ae77927-4486-4eed-9100-7e821c14374c"><block status="uncommenced"><txt break.before="1">the local government</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.42-tble2" guid="_d0528612-e88c-46dd-af8d-a865c969bd80"><block status="uncommenced"><txt break.before="1">the local government for the local government area where the development is located</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.43" guid="_6304b29e-5996-4c5f-9a77-95c39a2c8f61"><entry namest="1" nameend="2" id="sec.280-tbl-tblr-oc.43-tble1" guid="_89723e23-1e07-4431-ae3a-fa38872ef2c1"><block status="uncommenced"><txt break.before="1">For a PIA—</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.44" guid="_b55117e0-3631-416e-8059-a6ad3a1995e0"><entry colname="1" id="sec.280-tbl-tblr-oc.44-tble1" guid="_2ef0770b-bd78-432b-aa80-6bc7e8aad057"><block status="uncommenced"><txt break.before="1">a PIA</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.44-tble2" guid="_50b4d981-fdbc-41dd-b944-df030f7de818"><block status="uncommenced"><txt break.before="1">a local government’s PIA</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.45" guid="_e1c575c0-a96f-4dc9-a9db-261f55470dbb"><entry colname="1" id="sec.280-tbl-tblr-oc.45-tble1" guid="_e8569fc1-9c45-4a1b-b9f5-7bfaf00d4e10"><block status="uncommenced"><txt break.before="1">a PIA in relation to a development application or a condition of a development approval</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.45-tble2" guid="_d2449ae7-3d86-447a-8e6b-97b80b544614"><block status="uncommenced"><txt break.before="1">the local government’s PIA</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.46" guid="_3867c254-befd-483a-807c-45bf22e26b5b"><entry namest="1" nameend="2" id="sec.280-tbl-tblr-oc.46-tble1" guid="_6fe1b18c-5525-466d-bb83-d67cf1f519fe"><block status="uncommenced"><txt break.before="1">For a LGIP—</txt></block></entry></row><row rowsep="1" id="sec.280-tbl-tblr-oc.47" guid="_9f93a79c-039e-4571-946f-053f6163a9b0"><entry colname="1" id="sec.280-tbl-tblr-oc.47-tble1" guid="_0884f323-f862-4d70-b90f-16913c63a05d"><block status="uncommenced"><txt break.before="1">a LGIP</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.47-tble2" guid="_103145b8-e8dd-4903-8e69-000937a1c0b7"><block status="uncommenced"><txt break.before="1">a local government’s LGIP</txt></block></entry></row><row rowsep="0" id="sec.280-tbl-tblr-oc.48" guid="_ab3b91db-03d5-4d43-8e5f-5f5ee22a1abf"><entry colname="1" id="sec.280-tbl-tblr-oc.48-tble1" guid="_a65b7743-d8ed-4663-934f-784d95d35b83"><block status="uncommenced"><txt break.before="1">a LGIP in relation to a development application or a condition of a development approval</txt></block></entry><entry colname="2" id="sec.280-tbl-tblr-oc.48-tble2" guid="_3eecb5a2-4efc-4466-8735-d3e31f49a154"><block status="uncommenced"><txt break.before="1">the local government’s LGIP</txt></block></entry></row></tbody></tgroup></table></block></clause><clause id="sec.281" guid="_37b70214-cc72-418b-a0e6-61b06ed0f2c9" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>281</no><heading id="sec.281-he" guid="_0d78380d-c297-4b69-866f-ef2d8f949db2">Delegation</heading><block status="uncommenced"><txt break.before="1">A Minister may delegate the Minister’s functions under this Act to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.281-para1.a" guid="_d61699ea-a0dd-4c35-ae6a-4d0c10073f71" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">an appropriately qualified public service officer; or</txt></block></li><li id="sec.281-para1.b" guid="_d3f7e631-c09f-48e9-bb0f-18b68d322314" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">another Minister.</txt></block></li></list></block></clause><clause id="sec.282" guid="_c5681638-41a3-42d8-8ec7-bea83b71aaa6" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>282</no><heading id="sec.282-he" guid="_3572dd00-ea20-4344-9504-f978925195ee">Approved forms</heading><block status="uncommenced"><txt break.before="1">The chief executive may approve forms for use under this Act.</txt></block></clause><clause id="sec.283" guid="_13beeb78-cb75-4860-a5b9-637af65c168e" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>283</no><heading id="sec.283-he" guid="_768b1810-173c-4df1-80bd-8b7eb3322538">Guideline-making power</heading><subclause id="sec.283-ssec.1" guid="_20f4e46c-c08a-4b70-8461-c6daea7cb865" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The Minister or chief executive may make guidelines about—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.283-ssec.1-para1.a" guid="_55e0934a-8ad7-494d-8811-c1f552af4639" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the matters a person must consider when performing a function under this Act; and</txt></block></li><li id="sec.283-ssec.1-para1.b" guid="_987b16d0-e822-4310-836c-5ce2bf467c42" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">another matter the Minister or chief executive considers appropriate for the administration of this Act.</txt></block></li></list></block></subclause><subclause id="sec.283-ssec.2" guid="_42be0e9c-308f-41b6-a03d-1af3571b6d90" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The Minister or chief executive must consult with the persons the Minister or chief executive considers appropriate, before making a guideline.</txt></block></subclause><subclause id="sec.283-ssec.3" guid="_a5a89fc2-7a45-4e0f-964e-07c5c10eb9a8" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The Minister or chief executive must notify the making of a guideline by a notice published in the gazette.</txt></block></subclause><subclause id="sec.283-ssec.4" guid="_e279e00a-a7f7-422f-b857-e2d4ac6c0ce5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The guideline starts to have effect on the day after the notice is published.</txt></block></subclause></clause><clause id="sec.284" guid="_50005b87-5818-4ac5-a4f5-6a53eed5b6ff" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>284</no><heading id="sec.284-he" guid="_789d6d5a-069d-4cd4-8be7-26b27ce7d134">Regulation-making power</heading><subclause id="sec.284-ssec.1" guid="_0c577061-17d9-4507-bd7b-6ecf2d2a18ff" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The Governor in Council may make regulations under this Act.</txt></block></subclause><subclause id="sec.284-ssec.2" guid="_9c25c714-41e3-4750-a6d8-4456bfa5cd5f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">For example, a regulation may—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.284-ssec.2-para1.a" guid="_2232a4ee-0663-4b56-ba9d-9c48f2ad6969" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">prescribe a minor change of use that is not a material change of use; or</txt></block></li><li id="sec.284-ssec.2-para1.b" guid="_2e3f775a-be07-4ad9-8a55-0570853fa866" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">provide for how local governments must approve plans for reconfiguring a lot (plans of subdivision under the <legref jurisd="QLD" type="act" check="unknown">Land Title Act</legref>, for example); or</txt></block></li><li id="sec.284-ssec.2-para1.c" guid="_534b7b40-ffaa-4703-81c8-f768c13af54d" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">prescribe fees payable under this Act; or</txt></block></li><li id="sec.284-ssec.2-para1.d" guid="_88e6047c-8a9a-4e8a-a503-81b96ef451a7" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">impose a penalty for contravention of a provision of a regulation of no more than 20 penalty units.</txt></block></li></list></block></subclause></clause></part></chapter><chapter id="ch.8" guid="_077f5ca4-9a06-4171-99b9-531dbc061c77" affected.by.uncommenced="0"><no>Chapter 8</no><heading id="ch.8-he" guid="_b0065613-9cf2-442d-b2a7-4dfb4378efdd">Transitional provisions and repeal</heading><part id="ch.8-pt.1" guid="_6e73cbea-ffe9-4d93-83a7-9c40fb7a70b7" affected.by.uncommenced="0"><no>Part 1</no><heading id="ch.8-pt.1-he" guid="_1cdfe4ba-70c4-460e-98e7-c795d98f9355">Transitional provisions for repeal of <legref jurisd="QLD" type="act" check="unknown">Sustainable Planning Act 2009</legref></heading><division id="ch.8-pt.1-div.1" guid="_3addef51-7d30-4bca-9629-a10f578974bd" status="uncommenced" affected.by.uncommenced="0"><no>Division 1</no><heading id="ch.8-pt.1-div.1-he" guid="_cca09a18-1a2e-4aba-8c81-382ff48a22ce">Introduction</heading><clause id="sec.285" guid="_8bd46db1-ddbe-4b4a-8ef4-26f7bf618a2b" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>285</no><heading id="sec.285-he" guid="_a2d3d049-848a-45e5-a058-0d27f6813b32">What this part is about</heading><subclause id="sec.285-ssec.1" guid="_a7e8f1bd-7bba-4750-8d9e-a02151d417ae" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This part is about the transition from the repealed <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Sustainable Planning Act 2009</name></legref> (the <defterm id="sec.285-def.oldAct" guid="_bc42fc4e-64cf-48dc-8e7b-491188e2cd79" type="definition">old Act</defterm>) to this Act.</txt></block></subclause><subclause id="sec.285-ssec.2" guid="_a4ff7dba-83c3-4d3e-9c00-3cd18805148f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">If this part applies a provision (the <defterm id="sec.285-def.appliedprovision" guid="_fffed4b5-2dc0-4d05-bf32-c6729fca281d" type="definition">applied provision</defterm>) of the old Act to a thing, the following provisions also apply to the thing—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.285-ssec.2-para1.a" guid="_afc7923b-3a0a-4844-914e-959b7bae15e0" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">any other provision of the old Act, to the extent the applied provision refers to the other provision;</txt></block></li><li id="sec.285-ssec.2-para1.b" guid="_8b88632d-c151-41d6-b430-7989b2fc5765" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">any definition in the old Act that is relevant to the applied provision or a provision stated in paragraph (a).</txt></block></li></list></block></subclause><subclause id="sec.285-ssec.3" guid="_a878c272-f061-4180-b77d-8e54b3f90e84" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">Division 2 applies subject to the other divisions of this part.</txt></block></subclause></clause></division><division id="ch.8-pt.1-div.2" guid="_a69e854e-e6b9-4d9c-a6d0-382e3b2d1ca9" status="uncommenced" affected.by.uncommenced="0"><no>Division 2</no><heading id="ch.8-pt.1-div.2-he" guid="_00981dfe-f1a9-4c9f-becb-6905dec1e250">General provisions</heading><clause id="sec.286" guid="_a254a9e2-8460-4d0a-95d7-ba5641ae3382" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>286</no><heading id="sec.286-he" guid="_d3c300e4-d0c8-40b6-b097-5c1dca187a67">Documents</heading><subclause id="sec.286-ssec.1" guid="_5e15186e-86b9-42cb-97db-583994f20125" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to a document under the old Act that is in effect when the old Act is repealed.</txt></block></subclause><subclause id="sec.286-ssec.2" guid="_5a6543bf-60d4-4fed-983a-8382aa7044d9" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">Subject to this part, the document continues to have effect according to the terms and conditions of the document, even if the terms and conditions could not be imposed under this Act.</txt></block></subclause><subclause id="sec.286-ssec.3" guid="_c788ff45-14a8-4100-b567-62e1c04a646a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">This Act applies to the document as if the document had been made under this Act.</txt></block></subclause><subclause id="sec.286-ssec.4" guid="_c82e76ce-9b77-4107-9750-9cd4916987e7" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">To remove any doubt, it is declared that the document took effect or was made, given or received when the document took effect or was made, given or received under the old Act.</txt></block></subclause><subclause id="sec.286-ssec.5" guid="_850900d1-ea63-4780-ae1c-f5e441dfc8d3" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The name of the document does not change unless subsection (6) applies to the document.</txt></block></subclause><subclause id="sec.286-ssec.6" guid="_7ec36774-22b1-4c5b-a264-ec848497d9c5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">If a document stated in column 1 of the following table is in effect when the old Act is repealed, the document is taken to be the document stated in column 2 of the table.</txt></block><block status="uncommenced"><table frame="all" colsep="0" rowsep="0" orient="port" id="sec.286-ssec.6-tbl" guid="_0f685e09-bbbd-4c76-b5a3-03dd569fa70a" heading.align="left" font.size="12.pt"><tgroup cols="2" colsep="0" rowsep="0" tgroupstyle="Unruled3column"><colspec colnum="1" colname="1" colwidth="2.500in" colsep="0"/><colspec colnum="2" colname="2" colwidth="2.500in" colsep="0"/><thead><row rowsep="0" id="sec.286-ssec.6-tbl-tblh-tblr" guid="_3669865e-3278-40f7-9b6a-efc0958be9ea"><entry colname="1" colsep="1" id="sec.286-ssec.6-tbl-tblh-tblr-tble1" guid="_b021827a-abf0-45df-a72a-858b7a6b7341"><block status="uncommenced"><txt break.before="1">Column 1</txt><txt break.before="1">Old name</txt></block></entry><entry colname="2" id="sec.286-ssec.6-tbl-tblh-tblr-tble2" guid="_d92c431d-6be2-4cd4-91e9-e8449456346e"><block status="uncommenced"><txt break.before="1">Column 2</txt><txt break.before="1">New name</txt></block></entry></row></thead><tbody><row rowsep="0" id="sec.286-ssec.6-tbl-tblr" guid="_0221c204-c6af-48a8-91e7-bae4e9c9d7ce"><entry colname="1" colsep="1" rowsep="1" id="sec.286-ssec.6-tbl-tblr-tble1" guid="_d97cc909-bb61-46d8-b33f-1782d36dae02"><block status="uncommenced"><txt break.before="1">a compliance certificate for a subdivision plan given under the repealed <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Sustainable Planning Regulation 2009</name></legref>, schedule 19</txt></block></entry><entry colname="2" rowsep="1" id="sec.286-ssec.6-tbl-tblr-tble2" guid="_996e0085-feb6-4c2e-bbbe-de71d8cb38e4"><block status="uncommenced"><txt break.before="1">an approval made under a regulation for section 284(2)(b)</txt></block></entry></row><row rowsep="0" id="sec.286-ssec.6-tbl-tblr-oc.2" guid="_b897a38f-2abb-421b-9547-276830e31274"><entry colname="1" colsep="1" rowsep="1" id="sec.286-ssec.6-tbl-tblr-oc.2-tble1" guid="_597b443f-e3ce-46ec-b94a-f31dad793a5c"><block status="uncommenced"><txt break.before="1">a compliance permit</txt></block></entry><entry colname="2" rowsep="1" id="sec.286-ssec.6-tbl-tblr-oc.2-tble2" guid="_b90387b9-d628-469b-b41f-c84d73d3651e"><block status="uncommenced"><txt break.before="1">a development permit</txt></block></entry></row><row rowsep="0" id="sec.286-ssec.6-tbl-tblr-oc.3" guid="_cf7bd878-6c3e-4306-87ee-83c97cb5f3e1"><entry colname="1" colsep="1" rowsep="1" id="sec.286-ssec.6-tbl-tblr-oc.3-tble1" guid="_f3967b37-11d1-43fb-9ed3-b4c77f43f288"><block status="uncommenced"><txt break.before="1">a designation of land for community infrastructure</txt></block></entry><entry colname="2" rowsep="1" id="sec.286-ssec.6-tbl-tblr-oc.3-tble2" guid="_26a30d83-6a55-4c06-b246-227f1bc2052c"><block status="uncommenced"><txt break.before="1">a designation</txt></block></entry></row><row rowsep="0" id="sec.286-ssec.6-tbl-tblr-oc.4" guid="_f3b4a589-38d3-42eb-a576-35a84d99579d"><entry colname="1" colsep="1" rowsep="1" id="sec.286-ssec.6-tbl-tblr-oc.4-tble1" guid="_9d5e60cf-3c3d-45a1-8874-cb72aa9de89c"><block status="uncommenced"><txt break.before="1">a notice under the old Act, section 97, about a request to apply a superseded planning scheme</txt></block></entry><entry colname="2" rowsep="1" id="sec.286-ssec.6-tbl-tblr-oc.4-tble2" guid="_e7b2b7fa-7a3e-43aa-95ce-6e89c18840a2"><block status="uncommenced"><txt break.before="1">a decision notice under section 29(7)</txt></block></entry></row><row rowsep="0" id="sec.286-ssec.6-tbl-tblr-oc.5" guid="_55ed9c42-508e-4cef-ae8a-675f8dea2fe8"><entry colname="1" colsep="1" rowsep="1" id="sec.286-ssec.6-tbl-tblr-oc.5-tble1" guid="_270556aa-b55b-4554-b61f-ade6dfc7bbe2"><block status="uncommenced"><txt break.before="1">a preliminary approval to which the old Act, section 242 applied</txt></block></entry><entry colname="2" rowsep="1" id="sec.286-ssec.6-tbl-tblr-oc.5-tble2" guid="_8c6727f4-d78f-4ba0-9ab5-e5602a87a0c2"><block status="uncommenced"><txt break.before="1">a variation approval</txt></block></entry></row><row rowsep="0" id="sec.286-ssec.6-tbl-tblr-oc.6" guid="_493c81f6-3e8f-42c3-a852-88b6963a4c67"><entry colname="1" colsep="1" id="sec.286-ssec.6-tbl-tblr-oc.6-tble1" guid="_6f358f9e-be16-4771-b775-b3728e2b89e3"><block status="uncommenced"><txt break.before="1">a statement by the Minister under the old Act, section 255</txt></block></entry><entry colname="2" id="sec.286-ssec.6-tbl-tblr-oc.6-tble2" guid="_5f276f7f-4ffb-4a5a-b02c-2dbba525be02"><block status="uncommenced"><txt break.before="1">a decision of the Minister under section 48(7)</txt></block></entry></row></tbody></tgroup></table></block></subclause><subclause id="sec.286-ssec.7" guid="_3d9d81f1-8961-4c46-8900-3e07586d381d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.286-ssec.7-def.document_" guid="_0d022090-5633-4dda-8b63-56ad28d4cba2" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.286-ssec.7-def.document" guid="_e7b17508-2807-40c0-86c5-8d7ff3de7776" type="definition">document</defterm>—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.286-ssec.7-def.document-para1.a" guid="_ef4f8035-ff17-44fd-8a1a-77f9b1ec4d0f" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">includes—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.286-ssec.7-def.document-para1.a-para2.i" guid="_0d13303a-8809-4b2c-9ec0-3eee04cd3573" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">an agreement (an infrastructure agreement or breakup agreement, for example); and</txt></block></li><li id="sec.286-ssec.7-def.document-para1.a-para2.ii" guid="_aca9dc6b-425e-4e87-8206-4bc7f79050c6" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">an instrument of appointment (the appointment of a referee, the registrar or a committee, for example); and</txt></block></li><li id="sec.286-ssec.7-def.document-para1.a-para2.iii" guid="_03c19aa8-0ffd-4e31-b430-47cd6d1c37d3" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">an approval (a development permit or preliminary approval, for example), including a deemed approval and a decision taken to have been made under the old Act, section 96(5); and</txt></block></li><li id="sec.286-ssec.7-def.document-para1.a-para2.iv" guid="_07470cd9-4c2e-45a6-b11c-0a5da4ae241c" status="uncommenced" provision.type="other"><no>(iv)</no><block status="uncommenced"><txt break.before="1">a certificate (a planning and development certificate, for example); and</txt></block></li><li id="sec.286-ssec.7-def.document-para1.a-para2.v" guid="_6c902ba5-7d33-4cd4-ac95-7418db531731" status="uncommenced" provision.type="other"><no>(v)</no><block status="uncommenced"><txt break.before="1">a delegation; and</txt></block></li><li id="sec.286-ssec.7-def.document-para1.a-para2.vi" guid="_5046361a-aa7e-4dd6-8b7b-1572e88ed553" status="uncommenced" provision.type="other"><no>(vi)</no><block status="uncommenced"><txt break.before="1">a direction; and</txt></block></li><li id="sec.286-ssec.7-def.document-para1.a-para2.vii" guid="_02136a7a-83bb-422b-bd0e-9620864f695f" status="uncommenced" provision.type="other"><no>(vii)</no><block status="uncommenced"><txt break.before="1">a notice (a notice under the old Act, section 255D(4), call in notice, decision notice, enforcement notice, infrastructure charges notice or show cause notice, for example); and</txt></block></li><li id="sec.286-ssec.7-def.document-para1.a-para2.viii" guid="_0192ed33-99b8-4500-b626-561d5d03f054" status="uncommenced" provision.type="other"><no>(viii)</no><block status="uncommenced"><txt break.before="1">a notation; and</txt></block></li><li id="sec.286-ssec.7-def.document-para1.a-para2.ix" guid="_842505b2-7e8f-45e3-98a2-6ce5b637ff9e" status="uncommenced" provision.type="other"><no>(ix)</no><block status="uncommenced"><txt break.before="1">a notification (a public notification, for example); and</txt></block></li><li id="sec.286-ssec.7-def.document-para1.a-para2.x" guid="_60a1c554-d041-4905-91aa-c10d4879a90b" status="uncommenced" provision.type="other"><no>(x)</no><block status="uncommenced"><txt break.before="1">an order (an enforcement order, for example); and</txt></block></li><li id="sec.286-ssec.7-def.document-para1.a-para2.xi" guid="_e3d7ee0c-13b7-422f-9072-31f505cca7b7" status="uncommenced" provision.type="other"><no>(xi)</no><block status="uncommenced"><txt break.before="1">a planning instrument (a State planning policy, regional plan, planning scheme, planning scheme policy, or temporary local planning instrument, for example); and</txt></block></li><li id="sec.286-ssec.7-def.document-para1.a-para2.xii" guid="_8cf406c6-e777-48fa-9a5c-3ea0d4aa728d" status="uncommenced" provision.type="other"><no>(xii)</no><block status="uncommenced"><txt break.before="1">a superseded planning scheme; and</txt></block></li><li id="sec.286-ssec.7-def.document-para1.a-para2.xiii" guid="_e435850e-f339-44ac-b981-67990d836fa2" status="uncommenced" provision.type="other"><no>(xiii)</no><block status="uncommenced"><txt break.before="1">a resolution (a charges resolution, for example); but</txt></block></li></list></block></li><li id="sec.286-ssec.7-def.document-para1.b" guid="_6b44dab3-935c-4989-8c2f-27746add60e4" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">does not include—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.286-ssec.7-def.document-para1.b-para2.i" guid="_5898cf1f-4568-4618-bb3d-08acabb15691" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">an approved form; or</txt></block></li><li id="sec.286-ssec.7-def.document-para1.b-para2.ii" guid="_f6a72589-18fd-4b42-a316-b9e68ed742a3" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">a guideline made by the Minister or chief executive; or</txt></block></li><li id="sec.286-ssec.7-def.document-para1.b-para2.iii" guid="_f1eddb0f-df2a-4b4b-aa3b-8815b1761872" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">a regulation.</txt></block></li></list></block></li></list></definition></deflist></block></subclause></clause><clause id="sec.287" guid="_8f50274b-f3a4-45fd-9a79-5341795ec447" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>287</no><heading id="sec.287-he" guid="_b38f1610-15b5-424e-8448-a82f7d000672">Statutory instruments</heading><subclause id="sec.287-ssec.1" guid="_9e067c80-23ba-4ce1-b866-269640cc7c2b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if a process for making or amending a statutory instrument had started under the old Act but had not ended before that Act was repealed.</txt></block></subclause><subclause id="sec.287-ssec.2" guid="_70156f32-15a1-4512-9bfb-939b51e076a7" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The old Act continues to apply to the making or amending of the statutory instrument.</txt></block></subclause><subclause id="sec.287-ssec.3" guid="_21cd89d5-e644-4b4b-ae42-f5c1f6aa754d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">However, the statutory instrument may be made or amended to include matters, or in a form, that the Minister is satisfied is consistent with this Act if the Minister is also satisfied the matters or the form does not substantially change the effect of the instrument.</txt></block></subclause><subclause id="sec.287-ssec.4" guid="_35145851-22e4-4539-b7c8-0eaaf7770881" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">This Act applies to the statutory instrument as made or amended when the process has ended, as if the statutory instrument had been made or amended under this Act.</txt></block></subclause><subclause id="sec.287-ssec.5" guid="_00f9b37b-daf4-4ffb-a4f2-dee8106fb7bb" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The statutory instrument has effect according to the terms and conditions of the statutory instrument, even if the terms and conditions could not be imposed on the statutory instrument under this Act.</txt></block></subclause><subclause id="sec.287-ssec.6" guid="_0f6e0f4e-1ec5-40e0-99af-fb156e8dabe9" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">To remove any doubt, it is declared that the statutory instrument takes effect or is made or amended when the statutory instrument takes effect or is made or amended under the old Act.</txt></block></subclause></clause><clause id="sec.288" guid="_7efe55e2-6152-463c-9d50-32883e300a86" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>288</no><heading id="sec.288-he" guid="_2ecfd206-7d04-445c-8a1f-82f20ea16448">Applications generally</heading><subclause id="sec.288-ssec.1" guid="_f907532c-d5dd-40fd-83b2-7982953687cb" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to an application (however described) that was made under the old Act but was not decided before that Act was repealed.</txt></block></subclause><subclause id="sec.288-ssec.2" guid="_93dac70c-a66c-4aab-abd1-2221cd3a6ab3" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The old Act continues to apply to the application instead of this Act.</txt></block></subclause><subclause id="sec.288-ssec.3" guid="_ca5db7b9-8bf3-4155-a26f-590e37d9b1b8" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">In particular—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.288-ssec.3-para1.a" guid="_80c111f6-4b97-44ec-b973-54b9f0246b23" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">chapter 6, part 8, division 1 of the old Act applies for dealing with the decision notices and deemed approvals related to the application; and</txt></block></li><li id="sec.288-ssec.3-para1.b" guid="_11c56819-a0af-4676-b21e-c8af782c4534" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">chapter 6, part 11 of the old Act applies for Ministerial powers related to the application.</txt></block></li></list></block></subclause><subclause id="sec.288-ssec.4" guid="_78b88f5d-efaa-41dd-b59e-ea8db4bbb4e3" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">However, section 279 of this Act applies instead of the old Act, section 259.</txt></block></subclause><subclause id="sec.288-ssec.5" guid="_a551700c-9177-474d-954e-82ba6b805935" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">To remove any doubt, it is declared that a document that results from the application—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.288-ssec.5-para1.a" guid="_0a0d91d6-ec93-4819-a859-d907db0ee991" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">takes effect or is made when the application takes effect or is made under the old Act; but</txt></block></li><li id="sec.288-ssec.5-para1.b" guid="_dde6911a-8c8f-449b-96fb-d9f37afa74fa" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">is taken to have been made under this Act, even if that type of document can not be made under this Act.</txt></block></li></list></block></subclause><subclause id="sec.288-ssec.6" guid="_dbefd0f6-f720-4803-9572-e176bbebb55a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">If the resulting document is a document of a type mentioned in the table for section 286(6), that subsection applies to the document as if the document had been in effect when the old Act was repealed.</txt></block></subclause><subclause id="sec.288-ssec.7" guid="_7be59392-133b-4833-9a70-3179d773ce24" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.288-ssec.7-def.application_" guid="_0e2db044-b863-4979-938b-585d4e3f8a32" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.288-ssec.7-def.application" guid="_0a8b11dd-be4e-424f-b923-ba3504cd72d8" type="definition">application</defterm> includes—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.288-ssec.7-def.application-para1.a" guid="_a5cc1e4b-da67-413e-887f-502bfd78bb34" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a claim for compensation; and</txt></block></li><li id="sec.288-ssec.7-def.application-para1.b" guid="_768c3eda-9d93-4832-a2a0-a9f231f15212" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a request; and</txt></block></li><li id="sec.288-ssec.7-def.application-para1.c" guid="_161a9f52-79ff-457e-a36c-c9faf35c1ca1" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">a submission for an infrastructure charges notice under the old Act, section 641.</txt></block></li></list></definition></deflist></block></subclause></clause><clause id="sec.289" guid="_46df8230-e640-4d44-8c40-dec7ada40ba6" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>289</no><heading id="sec.289-he" guid="_dd99f8e8-0478-4800-adad-1c61704caf6f">References to the old Act or provisions of the old Act</heading><subclause id="sec.289-ssec.1" guid="_d68c0c53-b0ce-4416-8228-5617e1b478a4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to a reference in another Act or a document.</txt></block></subclause><subclause id="sec.289-ssec.2" guid="_8116a593-bd9e-4525-99c2-12de2bf0fcbc" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">Unless the contrary intention appears—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.289-ssec.2-para1.a" guid="_80398513-f898-4e92-9a19-4730f4720625" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a reference to the old Act is a reference to this Act; and</txt></block></li><li id="sec.289-ssec.2-para1.b" guid="_6de97f8e-dd30-4710-86b8-d75a3293fa30" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a reference to a provision of the old Act is a reference to the provision of this Act that corresponds, or most closely corresponds, to the provision of the old Act; and</txt></block></li><li id="sec.289-ssec.2-para1.c" guid="_76b1bc9d-caae-4390-9bb8-4f3562377119" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">a reference to a person or thing in column 1 of the following table is a reference to the person or thing in column 2 of the table.</txt></block></li></list></block><block status="uncommenced"><table frame="all" colsep="1" rowsep="0" orient="port" id="sec.289-ssec.2-tbl" guid="_9eb24882-4871-4476-8b8a-e07c2c8fa2db" heading.align="left" font.size="12.pt"><tgroup cols="2" colsep="1" rowsep="0" tgroupstyle="Unruled3column"><colspec colnum="1" colname="1" colwidth="2.500in"/><colspec colnum="2" colname="2" colwidth="2.500in"/><thead><row rowsep="0" id="sec.289-ssec.2-tbl-tblh-tblr" guid="_b02b6f15-5f59-407f-9443-9af6230fc584"><entry colname="1" id="sec.289-ssec.2-tbl-tblh-tblr-tble1" guid="_62cd82c2-db6e-44d6-bbf3-cc4e898800e8"><block status="uncommenced"><txt break.before="1">Column 1</txt></block></entry><entry colname="2" id="sec.289-ssec.2-tbl-tblh-tblr-tble2" guid="_5bef20a7-5960-48ef-af55-410605387f72"><block status="uncommenced"><txt break.before="1">Column 2</txt></block></entry></row><row rowsep="1" id="sec.289-ssec.2-tbl-tblh-tblr-oc.2" guid="_852b6183-8959-43b5-b3c1-13e328c703bb"><entry colname="1" id="sec.289-ssec.2-tbl-tblh-tblr-oc.2-tble1" guid="_6accef8b-f616-41cd-b579-9cb3f7d29fcd"><block status="uncommenced"><txt break.before="1">Old name</txt></block></entry><entry colname="2" id="sec.289-ssec.2-tbl-tblh-tblr-oc.2-tble2" guid="_3d24c215-906a-4409-abfd-47b7786dde9f"><block status="uncommenced"><txt break.before="1">New name</txt></block></entry></row></thead><tbody><row rowsep="1" id="sec.289-ssec.2-tbl-tblr" guid="_cdfab868-0ece-4cd9-add3-840232d02f59"><entry colname="1" id="sec.289-ssec.2-tbl-tblr-tble1" guid="_3d5a4a83-0b73-4c2e-9b27-e25597ba69b9"><block status="uncommenced"><txt break.before="1">an assessing authority</txt></block></entry><entry colname="2" id="sec.289-ssec.2-tbl-tblr-tble2" guid="_f30f7321-cc33-4511-971a-c62afc4a882a"><block status="uncommenced"><txt break.before="1">an enforcement authority</txt></block></entry></row><row rowsep="1" id="sec.289-ssec.2-tbl-tblr-oc.2" guid="_5333431b-db2c-48b7-b9c4-e07b6d63a172"><entry colname="1" id="sec.289-ssec.2-tbl-tblr-oc.2-tble1" guid="_21463711-2432-4758-8257-7dbe6e11c5bc"><block status="uncommenced"><txt break.before="1">a designation of land for community infrastructure</txt></block></entry><entry colname="2" id="sec.289-ssec.2-tbl-tblr-oc.2-tble2" guid="_eb9d6e47-6b82-429c-962d-fefa43cd1a4c"><block status="uncommenced"><txt break.before="1">a designation</txt></block></entry></row><row rowsep="1" id="sec.289-ssec.2-tbl-tblr-oc.3" guid="_3a1f3da2-f45d-45da-9498-6ca9c8ff628c"><entry colname="1" id="sec.289-ssec.2-tbl-tblr-oc.3-tble1" guid="_6726cf87-83ec-4c1e-b714-28277ae74afb"><block status="uncommenced"><txt break.before="1">a preliminary approval to which the old Act, section 242 applies</txt></block></entry><entry colname="2" id="sec.289-ssec.2-tbl-tblr-oc.3-tble2" guid="_1368fc28-f5d0-4d8e-9a91-f818843adfc6"><block status="uncommenced"><txt break.before="1">a variation approval</txt></block></entry></row><row rowsep="1" id="sec.289-ssec.2-tbl-tblr-oc.4" guid="_e8f0d929-a857-4342-a9f4-bc034df0b5c2"><entry colname="1" id="sec.289-ssec.2-tbl-tblr-oc.4-tble1" guid="_d54d323d-e77c-4ad8-83a6-d79fa4299095"><block status="uncommenced"><txt break.before="1">a compliance permit</txt></block></entry><entry colname="2" id="sec.289-ssec.2-tbl-tblr-oc.4-tble2" guid="_76412b6b-4902-416a-a14b-b464387514f2"><block status="uncommenced"><txt break.before="1">a development permit</txt></block></entry></row><row rowsep="1" id="sec.289-ssec.2-tbl-tblr-oc.5" guid="_ca98419a-f45a-4de8-a7b9-400ba8557d61"><entry colname="1" id="sec.289-ssec.2-tbl-tblr-oc.5-tble1" guid="_28a03306-1194-4d4c-b811-87ed9f3cd78c"><block status="uncommenced"><txt break.before="1">a compliance certificate for a subdivision plan given under the repealed <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Sustainable Planning Regulation 2009</name></legref>, schedule 19</txt></block></entry><entry colname="2" id="sec.289-ssec.2-tbl-tblr-oc.5-tble2" guid="_57c5f4ed-1968-4dd0-9d0c-2db98cdc1676"><block status="uncommenced"><txt break.before="1">an approval given under section 284(2)(b)</txt></block></entry></row><row rowsep="1" id="sec.289-ssec.2-tbl-tblr-oc.6" guid="_730069f1-5bf9-4990-9ece-cee3e4cb2c50"><entry colname="1" id="sec.289-ssec.2-tbl-tblr-oc.6-tble1" guid="_7aa25119-8ee2-4d36-8a24-fbc0c6d20b9f"><block status="uncommenced"><txt break.before="1">a notice about a request under the old Act, section 95</txt></block></entry><entry colname="2" id="sec.289-ssec.2-tbl-tblr-oc.6-tble2" guid="_0cc4ff9c-5423-47ba-a542-bebc625b11c0"><block status="uncommenced"><txt break.before="1">a notice of a local government’s decision about a request given under section 29(7) or taken to have been given under section 29(8)</txt></block></entry></row><row rowsep="1" id="sec.289-ssec.2-tbl-tblr-oc.7" guid="_85886a25-882a-441d-a092-7030ecf99829"><entry colname="1" id="sec.289-ssec.2-tbl-tblr-oc.7-tble1" guid="_00441f71-deda-4f79-97fc-44d80564f670"><block status="uncommenced"><txt break.before="1">exempt development</txt></block></entry><entry colname="2" id="sec.289-ssec.2-tbl-tblr-oc.7-tble2" guid="_9c47f495-91fa-4f7e-bf00-c08a3da2db2a"><block status="uncommenced"><txt break.before="1">accepted development</txt></block></entry></row><row rowsep="1" id="sec.289-ssec.2-tbl-tblr-oc.8" guid="_3886d0bc-c36d-45ea-8c13-f2203f738022"><entry colname="1" id="sec.289-ssec.2-tbl-tblr-oc.8-tble1" guid="_5eaf6c3f-3558-42ec-a128-f212811e3649"><block status="uncommenced"><txt break.before="1">self-assessable development</txt></block></entry><entry colname="2" id="sec.289-ssec.2-tbl-tblr-oc.8-tble2" guid="_693b66af-d047-4d0f-97b0-0a7849248aad"><block status="uncommenced"><txt break.before="1">to the extent the development complies with all applicable codes for the self-assessable development—accepted development</txt></block></entry></row><row rowsep="1" id="sec.289-ssec.2-tbl-tblr-oc.9" guid="_be1cf6e2-143c-48fd-9327-890bd0fc8f94"><entry colname="1" id="sec.289-ssec.2-tbl-tblr-oc.9-tble1" guid="_00238801-3b04-46e2-8cf4-743766a89a7b"><block status="uncommenced"><txt break.before="1">self-assessable development</txt></block></entry><entry colname="2" id="sec.289-ssec.2-tbl-tblr-oc.9-tble2" guid="_fc05b945-80d3-4b02-a9f0-25403d66b312"><block status="uncommenced"><txt break.before="1">to the extent the development does not comply with all applicable codes for the self-assessable development—assessable development</txt></block></entry></row><row rowsep="1" id="sec.289-ssec.2-tbl-tblr-oc.10" guid="_da527e9d-eed0-4239-8be9-d33a85d536d3"><entry colname="1" id="sec.289-ssec.2-tbl-tblr-oc.10-tble1" guid="_64f0093c-794d-49a6-a3ce-6cf14fac8e0e"><block status="uncommenced"><txt break.before="1">a code, or other matter, against which assessable development must be assessed</txt></block></entry><entry colname="2" id="sec.289-ssec.2-tbl-tblr-oc.10-tble2" guid="_845c4ab0-08db-49c5-8d80-7c203c89a724"><block status="uncommenced"><txt break.before="1">an assessment benchmark</txt></block></entry></row><row rowsep="0" id="sec.289-ssec.2-tbl-tblr-oc.11" guid="_8c0d42cc-4f08-4d74-9323-561ab0a765b6"><entry colname="1" id="sec.289-ssec.2-tbl-tblr-oc.11-tble1" guid="_8a4df897-a61e-424e-ab21-3e3de61a93b1"><block status="uncommenced"><txt break.before="1">compliance assessment</txt></block></entry><entry colname="2" id="sec.289-ssec.2-tbl-tblr-oc.11-tble2" guid="_29eade28-c60a-454b-a82f-a3130707a11d"><block status="uncommenced"><txt break.before="1">code assessment</txt></block></entry></row></tbody></tgroup></table></block></subclause></clause><clause id="sec.290" guid="_8a87d54a-fb83-4c50-8c2c-a58fe3c64695" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>290</no><heading id="sec.290-he" guid="_f0ffb7e6-9ee6-4f9d-a0ad-b21ffba3c827">Lawful uses of premises</heading><block status="uncommenced"><txt break.before="1">To the extent an existing use of premises is lawful when the old Act is repealed, the use is taken to be a lawful use on the commencement.</txt></block></clause><clause id="sec.291" guid="_13fe3f31-6fb3-4b86-ae9a-3a8d223287fe" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>291</no><heading id="sec.291-he" guid="_5ae64d7d-d3fc-4cfd-babd-4221b63178dc">State planning regulatory and standard planning scheme provisions</heading><block status="uncommenced"><txt break.before="1">The following instruments made under the old Act stop having effect on the commencement—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.291-para1.a" guid="_14684fec-f601-45ae-9682-cdea2f14c4fd" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the State planning regulatory provisions;</txt></block></li><li id="sec.291-para1.b" guid="_b66cf8b4-8093-4438-91bb-4da05166747c" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the standard planning scheme provisions.</txt></block></li></list></block></clause><clause id="sec.292" guid="_d97111ab-17f1-4e3d-a6c4-f78be5771e9e" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>292</no><heading id="sec.292-he" guid="_b7d8dedb-4000-4075-bd1b-dbd41e815ca6">Declaration for certain continued provisions</heading><block status="uncommenced"><txt break.before="1">It is declared that the <legref jurisd="QLD" type="act" check="unknown">Interpretation Act</legref>, section 20A applies to the following provisions of the old Act—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.292-para1.a" guid="_764c9a35-52ce-49a1-b175-937d27ea9b51" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">section 850 (which is about conditions attaching to land);</txt></block></li><li id="sec.292-para1.b" guid="_cd4891c1-32c9-4cb5-a025-26fc30b5b5d3" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">section 859 (which is about the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Local Government (Robina Central Planning Agreement) Act 1992</name></legref>);</txt></block></li><li id="sec.292-para1.c" guid="_fc723fde-6eb4-43ed-9c8c-72315c90bdd4" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">section 861 (which is about orders in council relating to particular land);</txt></block></li><li id="sec.292-para1.d" guid="_bf3e90cf-b197-45bb-bed0-b9a5a329e71d" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">section 888 (which is about relevant development applications under the repealed <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Planning (Urban Encroachment—Milton Brewery) Act 2009</name></legref>);</txt></block></li><li id="sec.292-para1.e" guid="_30c2bda4-ced1-4a01-94e3-985c31a7daa6" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">section 958 (which is about enforcement by new local governments);</txt></block></li><li id="sec.292-para1.f" guid="_53a687b2-5b9b-44d1-8006-6f5669ea69f2" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">section 959I (which is about existing land transfer agreements or requirements);</txt></block></li><li id="sec.292-para1.g" guid="_c6c1caf7-9221-44c8-b948-05ba23873302" status="uncommenced" provision.type="other"><no>(g)</no><block status="uncommenced"><txt break.before="1">section 970 (which is about making a payment under an environmental offset condition).</txt></block></li></list><note id="sec.292-note" guid="_4e0a21c4-3e32-44d9-89c1-24e5405105e1" type="example"><heading id="sec.292-note-he" guid="_0bfca792-7d1b-4760-b9b2-99c09a1c08a1">Note—</heading><block status="uncommenced"><txt break.before="1">This section removes any doubt that the effect of those provisions does not end just because the old Act is repealed.</txt></block></note></block></clause></division><division id="ch.8-pt.1-div.3" guid="_361207f2-5428-495e-9554-0e5915e8ce98" status="uncommenced" affected.by.uncommenced="0"><no>Division 3</no><heading id="ch.8-pt.1-div.3-he" guid="_406e3a6b-7c47-427c-be1a-95e2b0dd4833">Planning</heading><clause id="sec.293" guid="_4b9157fe-4d1c-43b4-b225-cf46ce59f1ae" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>293</no><heading id="sec.293-he" guid="_ecaab6cd-e9c0-4a54-8ae2-819a9d9f2df4">Rules about amending local planning instrument consistent with Act</heading><subclause id="sec.293-ssec.1" guid="_39c76a64-ee46-42d4-b45e-38a187590f40" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The Minister may make rules about making amendments to a local planning instrument that are of a type the Minister is satisfied—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.293-ssec.1-para1.a" guid="_6f9a611d-5136-41c5-8024-bf7c0723954c" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">are consistent with this Act; and</txt></block></li><li id="sec.293-ssec.1-para1.b" guid="_59235cba-c469-4bc7-84a0-7f841acee00e" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">do not substantially change the effect of the instrument.</txt></block></li></list></block></subclause><subclause id="sec.293-ssec.2" guid="_88e935e7-d434-48be-b2ea-2326cbfc4aba" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">Section 17(2) and (3) does not apply to the rules.</txt></block></subclause><subclause id="sec.293-ssec.3" guid="_3f4d0469-215c-40e4-91cd-9474c4b61e1c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The rules start to have effect when the Minister publishes a gazette notice about the making of the rules.</txt></block></subclause><subclause id="sec.293-ssec.4" guid="_3b47616a-1114-4f1e-964b-20c6c466db1a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The rules must state that, if a local government makes an amendment under the rules, the local government must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.293-ssec.4-para1.a" guid="_5378a8d7-1981-4a02-b209-a6a3127c0bae" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">give a copy of the amendment to the chief executive; and</txt></block></li><li id="sec.293-ssec.4-para1.b" guid="_0422c1bb-1c66-4efd-8459-2a7465162671" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">publish a public notice about the amendment as if the amendment had been made under chapter 2, part 3.</txt></block></li></list></block></subclause><subclause id="sec.293-ssec.5" guid="_6ce46d53-9726-450b-8ce8-959ed5fdb67c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">A local government may make an amendment of a type mentioned in subsection (1) by following the process set out in the rules.</txt></block></subclause><subclause id="sec.293-ssec.6" guid="_6164b7ac-c2d0-4aa0-93d6-ec06c753d964" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">Section 9 applies to an amendment made under the rules as if the amendment had been made under chapter 2, part 3.</txt></block></subclause></clause><clause id="sec.294" guid="_9266fc5a-f37a-417f-b075-323f4f88252d" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>294</no><heading id="sec.294-he" guid="_6e3173b8-6293-4d0f-89cf-1d1148413cf7">Amending State planning instrument consistent with Act</heading><subclause id="sec.294-ssec.1" guid="_3407c242-0c13-4f51-9b06-a36716e41c31" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to a proposed amendment to a State planning instrument, if the Minister is satisfied the amendment—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.294-ssec.1-para1.a" guid="_3fdd576d-344e-487d-9f1e-716e5bb7a9fc" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">is consistent with this Act; and</txt></block></li><li id="sec.294-ssec.1-para1.b" guid="_c00e1cd9-ff78-415e-b24f-9eeddd08e6a3" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">does not substantially change the effect of the instrument.</txt></block></li></list></block></subclause><subclause id="sec.294-ssec.2" guid="_adbe660c-3af3-400c-b1e4-c36534b91a1a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The Minister may make the amendment under section 11 as if the amendment were a minor amendment.</txt></block></subclause><subclause id="sec.294-ssec.3" guid="_e0765bd2-cd24-4760-9ee2-d41053dcb524" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">Section 9(3) applies to the amendment.</txt></block></subclause></clause><clause id="sec.295" guid="_c80f66b2-fa46-414e-bd73-db6e6cb475cf" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>295</no><heading id="sec.295-he" guid="_e721a422-64ad-4034-b079-757c83e989c4">Request for application of superseded planning scheme</heading><subclause id="sec.295-ssec.1" guid="_6525b54d-1c70-42a5-909f-f05ddadf998e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.295-ssec.1-para1.a" guid="_ddb86a68-b825-40e2-8217-c1fcce89a8c9" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a request for the application of a superseded planning scheme under the old Act has been made but not decided before the commencement; and</txt></block></li><li id="sec.295-ssec.1-para1.b" guid="_49337ba7-00a6-49e8-b8b9-65db0fe9bf6c" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">after the commencement—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.295-ssec.1-para1.b-para2.i" guid="_885b214e-f6e7-4670-8c24-f8e5ce4feed5" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the local government is taken to have agreed to the request under the old Act, section 96(5); or</txt></block></li><li id="sec.295-ssec.1-para1.b-para2.ii" guid="_6275b411-51da-4468-a458-fce36e445801" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the local government gives a written notice under the old Act, section 97, agreeing to the request.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.295-ssec.2" guid="_d0fce1e1-ecda-49d3-bdca-2cf9a37604b0" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">Section 29(9) and (10) applies to the agreement made, or taken to have been made, by the local government.</txt></block><note id="sec.295-ssec.2-note" guid="_8a393d3d-8a0c-4e22-81d6-c1128f4e24f6" type="example"><heading id="sec.295-ssec.2-note-he" guid="_418bd3c6-69b9-48b0-8584-e0e23caee394">Note—</heading><block status="uncommenced"><txt break.before="1">For dealing with applications, including requests, that are made but not decided before the commencement, see section 288.</txt></block></note></subclause><subclause id="sec.295-ssec.3" guid="_bb740c8f-c53d-47fc-a527-7766085151ca" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">However, if the agreement relates to a request to accept a request for compliance assessment for development, section 29(9) and (10) applies as if the agreement were an agreement to accept a development application for the development.</txt></block></subclause></clause><clause id="sec.296" guid="_ca6267dd-232a-48f0-b562-772140aff1e7" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>296</no><heading id="sec.296-he" guid="_323787aa-e533-49f2-970d-ee0af5152bc1">Compensation claims</heading><subclause id="sec.296-ssec.1" guid="_46456257-bdd3-4834-a521-3bf8a3861a9d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.296-ssec.1-para1.a" guid="_ff4e8585-4e46-48d9-a170-83b0f0df0685" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a person, immediately before the commencement, had a right to make a claim for compensation under the old Act, sections 704 to 707, but had not made a claim; or</txt></block></li><li id="sec.296-ssec.1-para1.b" guid="_6293d298-f20e-4239-8c62-424d525cbfa6" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">after the commencement, a local government gives a person a notice under the old Act, section 97, refusing the person’s request to apply a superseded planning scheme; or</txt></block></li><li id="sec.296-ssec.1-para1.c" guid="_be0dadb9-cc7e-4fb4-81ff-e1948885f1db" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">a person had made a development application mentioned in the old Act, section 704(1)(d), before the commencement and, after the commencement, the application is refused or approved in part.</txt></block></li></list></block></subclause><subclause id="sec.296-ssec.2" guid="_a4f908f0-ccd3-4782-bb46-67bfd092aef3" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The person may make a claim for compensation under the old Act and, for that purpose, the old Act continues to apply to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.296-ssec.2-para1.a" guid="_d1133645-a2d7-42ee-b593-b53e83f3a7be" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a development application, or a request for compliance assessment made for the development for which the request was made; and</txt></block></li><li id="sec.296-ssec.2-para1.b" guid="_e2d139e7-c9a6-4770-98b8-e6f28367b767" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the claim.</txt></block></li></list><note id="sec.296-ssec.2-note" guid="_471e3178-a155-4b01-ad3c-9a3c7db1b2e0" type="example"><heading id="sec.296-ssec.2-note-he" guid="_b59a0daf-2b5a-4746-97cb-df4439bfada6">Note—</heading><block status="uncommenced"><txt break.before="1">See section 312 for appeal rights in relation to claims under this section.</txt></block></note></block></subclause></clause></division><division id="ch.8-pt.1-div.4" guid="_64451f08-5f11-4a2d-b8f8-2d17654209b0" status="uncommenced" affected.by.uncommenced="0"><no>Division 4</no><heading id="ch.8-pt.1-div.4-he" guid="_d87c8b58-7199-4935-bdb0-627436f6d65b">Development assessment</heading><clause id="sec.297" guid="_88877646-0ee8-415b-adff-392256a78b09" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>297</no><heading id="sec.297-he" guid="_a76c6778-18db-4c8b-b85d-a183fcac33ef">Categorising development under designations</heading><subclause id="sec.297-ssec.1" guid="_b6029fb3-7835-4991-a64e-1e637bc97132" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.297-ssec.1-para1.a" guid="_eb195346-836a-49aa-b282-1c2e8cb5d932" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a designation of land for community infrastructure is in force when the old Act is repealed; and</txt></block></li><li id="sec.297-ssec.1-para1.b" guid="_66a870a2-8af7-4255-91cb-c7aa9cfd977d" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">development under the designation is to be carried out after the commencement.</txt></block></li></list></block></subclause><subclause id="sec.297-ssec.2" guid="_9fd889a4-2f5c-46e8-b6f8-962976c7c74c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The development is categorised as follows, instead of the way stated in section 44(6)—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.297-ssec.2-para1.a" guid="_9422000d-7657-4d84-aa4d-369d1c807d50" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for development that was categorised as assessable development by a planning scheme, or temporary local planning instrument, made under the old Act—accepted development;</txt></block></li><li id="sec.297-ssec.2-para1.b" guid="_c65ef00f-a122-46ba-a493-911de8d0122b" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">to the extent the development involves reconfiguring a lot—accepted development;</txt></block></li><li id="sec.297-ssec.2-para1.c" guid="_e44944cb-7c6b-49e4-980a-b0d6570dfff8" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">otherwise—the category of development stated in a categorising instrument that is a regulation made under section 44.</txt></block></li></list></block></subclause></clause><clause id="sec.298" guid="_0f25992c-12a2-425d-ab4e-178f4a1e4f98" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>298</no><heading id="sec.298-he" guid="_2cdb566c-a7f3-49d2-9870-5cb9e0fd8737">Water infrastructure applications</heading><subclause id="sec.298-ssec.1" guid="_e98c0da2-1257-4799-8f96-f6dd5542943b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.298-ssec.1-para1.a" guid="_793bff76-7dbe-41b3-b425-527e6e4743a1" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a development approval was given before 1 July 2014; and</txt></block></li><li id="sec.298-ssec.1-para1.b" guid="_295ebc6a-0668-4485-98ea-90e77de172ee" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">one or more of the following applications (a <defterm id="sec.298-ssec.1-def.newapplication" guid="_813702b0-c3c2-440a-ad5a-a9ffc805d1ba" type="definition">new application</defterm>) is made, after the commencement, in relation to the development approval—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.298-ssec.1-para1.b-para2.i" guid="_bd1258cb-88f3-4690-a651-5ba8be15ff62" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a development application;</txt></block></li><li id="sec.298-ssec.1-para1.b-para2.ii" guid="_119e907b-6c31-4abf-a1fd-e9e2cd189735" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">a change application;</txt></block></li><li id="sec.298-ssec.1-para1.b-para2.iii" guid="_aaeed0a8-f3e4-49e7-b358-4f754ef43193" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">an extension application.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.298-ssec.2" guid="_f15c0b20-c0f0-4f74-ba6c-01e7739853ff" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">To the extent the new application relates to a distributor-retailer’s water infrastructure, the distributor-retailer is—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.298-ssec.2-para1.a" guid="_7cfd792d-cb13-4322-8c72-d7454874bb5a" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for a change application for a minor change—an affected entity; or</txt></block></li><li id="sec.298-ssec.2-para1.b" guid="_4d99d2b5-c903-41a7-95be-e80822fb9c91" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">otherwise—a referral agency.</txt></block></li></list></block></subclause><subclause id="sec.298-ssec.3" guid="_0179a36f-dd00-48c2-b54e-e43f202a0556" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">However, if, before 1 July 2014, the distributor-retailer delegated its functions as concurrence agency under the old Act to a participating local government, the local government is—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.298-ssec.3-para1.a" guid="_39fdb2c3-b966-4200-84f0-8bc061b54f30" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for a change application for a minor change—an affected entity; or</txt></block></li><li id="sec.298-ssec.3-para1.b" guid="_0be3225b-0c72-4f89-afde-3b70977141fd" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">otherwise—a referral agency.</txt></block></li></list></block></subclause><subclause id="sec.298-ssec.4" guid="_5a465a99-404c-478e-b43f-8a9f0522cd43" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The old Act, section 755D, as in force immediately before 1 July 2014, applies to the new application as if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.298-ssec.4-para1.a" guid="_81edd81f-a10c-41f1-951c-46f31c972296" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for a change application—that section referred to the responsible entity instead of to the ‘assessment manager’; and</txt></block></li><li id="sec.298-ssec.4-para1.b" guid="_f3a0f4be-f7c2-4ec8-a3fb-764413a32bba" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a reference in that section to sections 313(2) and 314(2) were a reference to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.298-ssec.4-para1.b-para2.i" guid="_76bb3dde-d06a-4918-a8fc-6060bb0f7b49" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">for a change application for a minor change—section 81(2) of this Act; or</txt></block></li><li id="sec.298-ssec.4-para1.b-para2.ii" guid="_aca2f79a-f6bf-4218-abd5-04110cc256a9" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">for any other change application or a development application—section 45(3)(a) and (5)(a)(i) of this Act; or</txt></block></li><li id="sec.298-ssec.4-para1.b-para2.iii" guid="_67a9d51e-60fc-4977-ad5f-c9b988a43ff8" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">for an extension application—a matter the assessment manager may consider under section 87(1) of this Act.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.298-ssec.5" guid="_71e54d8c-b6a3-46b5-a6a7-3a4b9cf5dbd8" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The old Act, section 755U, as in force immediately before 1 July 2014, applies to the new application as if that section referred to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.298-ssec.5-para1.a" guid="_fbccd939-f667-48de-bd98-f2234c857b65" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the new application, instead of to ‘a development application (distributor-retailer)’; and</txt></block></li><li id="sec.298-ssec.5-para1.b" guid="_9b59c2f3-b6fe-4c5b-be19-c05f695ea5d9" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a notice of appeal under the P&#38;E Court Act, instead of to ‘a notice of appeal under section 482’.</txt></block></li></list></block></subclause></clause><clause id="sec.299" guid="_b35cb89d-8d96-4c8c-91eb-cb5d5bb029aa" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>299</no><heading id="sec.299-he" guid="_19699e81-7dcd-4feb-9984-ec368dcbe9ae">Development approvals and compliance permits</heading><subclause id="sec.299-ssec.1" guid="_b9974d18-03ed-460a-9c54-ce48858b473f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">Section 85 of this Act does not apply to a development approval or compliance permit given under the old Act.</txt></block></subclause><subclause id="sec.299-ssec.2" guid="_0202bd3b-e0f4-4be8-8795-5caacd9f2bf9" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">Instead—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.299-ssec.2-para1.a" guid="_67148012-f1b4-4725-92d4-b166514f95a2" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the old Act, section 341 applies to the development approval, and the relevant period mentioned in the section is taken to be the currency period; and</txt></block></li><li id="sec.299-ssec.2-para1.b" guid="_3c414284-19ee-4b24-8b22-dfb85534e06e" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the old Act, section 409(2) applies to the compliance permit, and the relevant period mentioned in the section is taken to be the currency period.</txt></block></li></list></block></subclause><subclause id="sec.299-ssec.3" guid="_df106e81-4b16-4a50-a4d5-0b89706e940b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">For a development approval to which the old Act, section 944A, applied—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.299-ssec.3-para1.a" guid="_46fddc61-5d7d-480d-a5d0-fbde6e968c7a" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for a change application or extension application—the chief executive becomes—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.299-ssec.3-para1.a-para2.i" guid="_9017fd61-c85b-42ae-8763-c2fedf6f432a" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">if the relevant entity stated in that section was the assessment manager—the assessment manager; or</txt></block></li><li id="sec.299-ssec.3-para1.a-para2.ii" guid="_dc6c58fe-e0fb-439d-8f53-73db11f8418e" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">if the relevant entity stated in that section was a concurrence agency—a referral agency; and</txt></block></li></list></block></li><li id="sec.299-ssec.3-para1.b" guid="_5c45303e-7f89-4511-ae76-a8a6f3c82937" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the relevant entity stated in that section, as a concurrence agency, imposed a condition of the approval—the chief executive is taken to have imposed the condition.</txt></block></li></list></block></subclause><subclause id="sec.299-ssec.4" guid="_572913a6-1ebf-4e95-bd00-6b3d71e08d39" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">For any other development approval, the person who was the assessment manager or a referral agency for the development application for the approval continues as the assessment manager or referral agency for this Act.</txt></block></subclause><subclause id="sec.299-ssec.5" guid="_60d46b69-e1c7-4f69-b3ec-89ff4129a019" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">For subsection (4), a compliance assessor under the old Act is taken to be an assessment manager in relation to a change application, extension application or cancellation application.</txt></block></subclause></clause><clause id="sec.300" guid="_12f65eea-c29e-41db-adfe-73677ed29e5e" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>300</no><heading id="sec.300-he" guid="_62044d0e-3064-4bc7-ba97-5e399f19ebe2">Change applications for designated infrastructure</heading><block status="uncommenced"><txt break.before="1">For a development approval for infrastructure on land designated for the infrastructure before the commencement, only the person who intends to supply, or is supplying, the infrastructure may make a change application in relation to the approval.</txt></block></clause></division><division id="ch.8-pt.1-div.5" guid="_4de25ca3-0f4c-4e56-88e9-fb4d1defd0b2" status="uncommenced" affected.by.uncommenced="0"><no>Division 5</no><heading id="ch.8-pt.1-div.5-he" guid="_ead09c29-ea8f-41e1-8614-28795f60fb14">Infrastructure</heading><clause id="sec.301" guid="_9dcb9989-058e-4fae-a6a7-f1924bac7b0b" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>301</no><heading id="sec.301-he" guid="_0d526f74-c728-4fa7-b545-c43ce55ad250">Infrastructure charges notices</heading><subclause id="sec.301-ssec.1" guid="_b81e67b7-f807-4493-8f5f-fcea00400803" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The old Act applies to the following notices given by a local government or distributor-retailer that are in force when the old Act is repealed—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.301-ssec.1-para1.a" guid="_7a427d77-0309-4ad2-8958-7d287daf599c" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">an infrastructure charges notice given before 4 July 2014;</txt></block></li><li id="sec.301-ssec.1-para1.b" guid="_35de47aa-5260-4796-aef9-fc15f27eae4c" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a negotiated infrastructure charges notice;</txt></block></li><li id="sec.301-ssec.1-para1.c" guid="_04cf2b96-1965-4fc9-8000-caab78a603d3" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">an adopted infrastructure charges notice;</txt></block></li><li id="sec.301-ssec.1-para1.d" guid="_94961d31-d593-46da-8fe6-5bf3f3a3ab59" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">a negotiated adopted infrastructure charges notice;</txt></block></li><li id="sec.301-ssec.1-para1.e" guid="_15ec7fea-5cdb-4f4e-8ca0-bbc270a27f14" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">a regulated infrastructure charges notice;</txt></block></li><li id="sec.301-ssec.1-para1.f" guid="_2c2cd804-96ad-4be2-8910-844a07dba004" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">a negotiated regulated infrastructure charges notice.</txt></block></li></list></block></subclause><subclause id="sec.301-ssec.2" guid="_77a0f176-5ffd-43e1-94ed-880ddcc102e1" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, if the notice relates to a development approval that is changed or extended before or after the old Act is repealed, this Act, other than section 137, applies to amending the notice.</txt></block></subclause><subclause id="sec.301-ssec.3" guid="_97949966-41d3-48b1-abd0-6b0e9b50779c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">Subsection (2) does not apply to a notice given by a distributor-retailer.</txt></block></subclause></clause><clause id="sec.302" guid="_0dac6895-fdb7-4710-a42e-5ec727662a52" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>302</no><heading id="sec.302-he" guid="_35ec40ab-74c1-408a-bcd5-cf2a1e9bbf0a">Levied charges</heading><subclause id="sec.302-ssec.1" guid="_3054447f-72fd-48b2-814a-d91c3365fae5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The old Act continues to apply to the following charges, including any offset, refund or repayment that applied to the charge—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.302-ssec.1-para1.a" guid="_b052df78-e5b3-4d0c-959a-67f465bd77e1" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">an infrastructure charge payable before 4 July 2014;</txt></block></li><li id="sec.302-ssec.1-para1.b" guid="_08407244-778f-46aa-b097-a26fd720b592" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a regulated infrastructure charge;</txt></block></li><li id="sec.302-ssec.1-para1.c" guid="_b888ae8e-cf90-485a-857c-eb24bee4e827" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">an adopted infrastructure charge.</txt></block></li></list></block></subclause><subclause id="sec.302-ssec.2" guid="_dcded3b4-9f7f-424b-a205-6a877dc2b48f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">This Act applies to a levied charge that was levied under the old Act after 3 July 2014, as if the charge had been levied under this Act.</txt></block></subclause><subclause id="sec.302-ssec.3" guid="_d908a1c4-f16a-4ebb-a11a-cc4bd6c99765" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">To remove any doubt, it is declared that the levied charge was levied when the levied charge was levied under the old Act.</txt></block></subclause></clause><clause id="sec.303" guid="_72c73b76-f4c8-4fc1-9c57-0a28dc85b3ae" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>303</no><heading id="sec.303-he" guid="_a277b078-a814-4e7b-aabd-23f0d4546be1">Infrastructure charges</heading><subclause id="sec.303-ssec.1" guid="_6720492b-d2b5-43a4-8d54-3c98841a583d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This Act applies to an infrastructure charge adopted under a charges resolution made under the old Act, as if the charge had been adopted under this Act.</txt></block></subclause><subclause id="sec.303-ssec.2" guid="_610060c6-c723-45b9-a0ae-e5aea0536372" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">To remove any doubt, it is declared that the infrastructure charge was adopted when the charges resolution was made under the old Act.</txt></block></subclause></clause><clause id="sec.304" guid="_2ab0cacd-7a50-48ff-a211-b965fa7f5dbc" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>304</no><heading id="sec.304-he" guid="_f77f1d88-9fd8-4080-a2a6-a36184587cc8">Infrastructure charges resolutions</heading><subclause id="sec.304-ssec.1" guid="_f2490f36-d5d5-47ee-a25c-7c52fd5885e1" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies in relation to a local government’s planning scheme that—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.304-ssec.1-para1.a" guid="_27c1512d-6629-40e2-aa68-b78ea7539af6" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">did not include a PIP (as defined under the old Act) before 4 July 2014; and</txt></block></li><li id="sec.304-ssec.1-para1.b" guid="_1ec8cc1f-4a54-456f-ba9a-70c05c38ded2" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">does not include a LGIP on the commencement.</txt></block></li></list></block></subclause><subclause id="sec.304-ssec.2" guid="_85d59de9-873d-44d9-9902-b30ddce76ab7" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">A regulation may identify a PIA for a local government area.</txt></block></subclause><subclause id="sec.304-ssec.3" guid="_87731c77-7d18-4089-845d-17fda867f180" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">A charges resolution, whether made before or after the commencement, may do either or both of the following despite sections 113 and 114—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.304-ssec.3-para1.a" guid="_def43f34-a388-4994-9a73-d393eefa89ec" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">identify development infrastructure as trunk infrastructure for the local government area;</txt></block></li><li id="sec.304-ssec.3-para1.b" guid="_2b04845f-7e76-4a38-aed4-fcc83506618d" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">state the required standard of service, and establishment costs, for the trunk infrastructure identified.</txt></block></li></list></block></subclause><subclause id="sec.304-ssec.4" guid="_9a7f9120-fd91-430f-bb6c-f75f4d7ffd49" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The local government may do the following as if the matters under subsection (3) were part of a LGIP, despite section 111—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.304-ssec.4-para1.a" guid="_e14e2815-13fe-449f-aad5-6bedf5d10b52" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">adopt charges under section 113;</txt></block></li><li id="sec.304-ssec.4-para1.b" guid="_21aa4c38-8f6a-4da7-9ff6-2552f63a9072" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">give an infrastructure charges notice under section 119;</txt></block></li><li id="sec.304-ssec.4-para1.c" guid="_b1afb2da-fc25-4aed-8039-1c1a833a859b" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">impose conditions about trunk infrastructure under section 128 or 130.</txt></block></li></list></block></subclause><subclause id="sec.304-ssec.5" guid="_c3c6b575-bbfd-4e2a-a8ac-532d287cec5d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">This section stops having effect on the earlier of the following days—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.304-ssec.5-para1.a" guid="_15efcb93-065b-497b-bef4-7962629d6bfb" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the day the local government—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.304-ssec.5-para1.a-para2.i" guid="_eb984a49-6263-4a3e-ba7e-0d893d41231b" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">amends the planning scheme to include a LGIP; or</txt></block></li><li id="sec.304-ssec.5-para1.a-para2.ii" guid="_cda5104b-7289-488f-a3b4-eaeaf5542b36" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">adopts a new planning scheme that includes a LGIP;</txt></block></li></list></block></li><li id="sec.304-ssec.5-para1.b" guid="_447269c4-29ea-4bf9-808a-9ffc714d7cb2" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the local government’s cut-off date under the old Act, section 975A, is after the commencement—the cut-off date.</txt></block></li></list></block></subclause></clause><clause id="sec.305" guid="_516f0111-6486-44ee-87e8-fb23e37a41f3" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>305</no><heading id="sec.305-he" guid="_47651a9f-0992-4aaf-a9ae-95fb6faea47a">Infrastructure charges in declared master plan area</heading><subclause id="sec.305-ssec.1" guid="_1c3a1dbd-b5b2-451e-8247-7786967ef7a4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A local government’s charges resolution may state whether an infrastructure charge may be levied for development in a declared master planned area of the local government.</txt></block></subclause><subclause id="sec.305-ssec.2" guid="_c4115167-bca6-42b3-bc81-4d2082f9146a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">If the local government’s charges resolution does not do so, the local government must not levy an infrastructure charge for development in the declared master planned area.</txt></block></subclause><subclause id="sec.305-ssec.3" guid="_4a57ee5b-df5d-41cd-a5c9-ad76192d9848" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.305-ssec.3-def.declaredmasterplannedarea_" guid="_659e7e47-8a79-4def-9432-c719cd7a2e74" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.305-ssec.3-def.declaredmasterplannedarea" guid="_ca230d62-1235-4025-b775-353e678a6b7f" type="definition">declared master planned area</defterm> has the meaning given in the old Act, as in force on 21 November 2012.</txt></definition></deflist></block></subclause></clause><clause id="sec.306" guid="_b6144f11-2547-4985-9c68-70ae5f65b4b9" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>306</no><heading id="sec.306-he" guid="_f857b75e-4056-4760-ab9e-ed37e901dc2b">Infrastructure conditions</heading><subclause id="sec.306-ssec.1" guid="_ba33ec20-7e32-431f-874b-8eb4823a238b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to a development approval, in force when the old Act is repealed, that is subject to a condition imposed under the old Act, section 848(2)(c).</txt></block></subclause><subclause id="sec.306-ssec.2" guid="_c90b3b93-e99e-472a-8d6e-0f3e6c87e176" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The old Act, section 848(3) to (5), other than subsection (3)(b), continues to apply to the development approval.</txt></block></subclause></clause><clause id="sec.307" guid="_00b7329a-8e67-4885-b7e0-e6ec02dc6d00" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>307</no><heading id="sec.307-he" guid="_77cfbb82-9d5a-4aa1-a5f6-18c49e514326">Infrastructure conditions—change or extension approval</heading><subclause id="sec.307-ssec.1" guid="_47c69680-80df-4e76-b379-41abb516b9aa" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to a development approval, in force when the old Act is repealed, that is subject to a condition imposed under the old Act, section 848(2)(c).</txt></block></subclause><subclause id="sec.307-ssec.2" guid="_f36a9c74-3f38-49dc-bdbb-35f83cc1c978" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">This Act, other than section 120(3)(a) and (b), applies to the giving of an infrastructure charges notice in relation to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.307-ssec.2-para1.a" guid="_45beca5b-512b-4867-8833-4ca0d21fd205" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a change approval given in relation to the development approval; or</txt></block></li><li id="sec.307-ssec.2-para1.b" guid="_35b2fb37-17aa-47bf-b9ca-7ce33aec0fbd" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">an extension approval given in relation to the development approval.</txt></block></li></list></block></subclause><subclause id="sec.307-ssec.3" guid="_c871727d-16ba-4a82-bf44-0d07f8ee8d8d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">A distributor-retailer may give an infrastructure charges notice under the SEQ Water Act, chapter 4C, in relation to the change approval or extension approval as if the development approval were a water approval under that Act.</txt></block></subclause><subclause id="sec.307-ssec.4" guid="_554111c0-2851-4a0c-9540-6511d9ac8970" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">Chapter 4C of the SEQ Water Act, other than sections 99BRCJ(3) and (3A), applies to the infrastructure charges notice—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.307-ssec.4-para1.a" guid="_67697528-f0b6-4f44-8010-07a9e88afe02" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">as if that chapter referred to a change to, or extension of, the development approval instead of to an amendment of a condition of a water approval; and</txt></block></li><li id="sec.307-ssec.4-para1.b" guid="_03c37425-7a71-44ee-acb9-028fc4555f66" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">with any other necessary changes.</txt></block></li></list></block></subclause><subclause id="sec.307-ssec.5" guid="_cb056d39-6eac-4144-8775-3e10923d0334" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">This section applies whether the change approval or extension approval (however described) is given before or after the commencement.</txt></block></subclause><subclause id="sec.307-ssec.6" guid="_6482acee-04cc-480b-b9c7-9480c2da8b4f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><block status="uncommenced"><deflist><definition id="sec.307-ssec.6-def.changeapproval_" guid="_a17f3200-33ed-4f37-ac2a-2f20208284dd" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.307-ssec.6-def.changeapproval" guid="_29c6fc50-fbb0-4729-8918-f244d7cfc356" type="definition">change approval</defterm> means an approval to change a development approval.</txt></definition><definition id="sec.307-ssec.6-def.extensionapproval_" guid="_561b9d29-4083-4838-821e-e8a51210a773" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.307-ssec.6-def.extensionapproval" guid="_7cd9dbab-fc64-4dde-9d8a-fef4c2db6ab7" type="definition">extension approval</defterm> means an approval to extend a development approval.</txt></definition></deflist></block></deflist></block></subclause></clause><clause id="sec.308" guid="_097dea56-96fa-49ee-8c47-9f49565229ad" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>308</no><heading id="sec.308-he" guid="_2da346db-d0f6-4a6b-b73d-c2319875b988">Infrastructure agreements</heading><block status="uncommenced"><txt break.before="1">Section 157(2) does not apply to an infrastructure agreement entered into before 4 July 2014.</txt></block></clause></division><division id="ch.8-pt.1-div.6" guid="_f9567d82-c92e-49f1-b82f-e87e25c1aa7f" status="uncommenced" affected.by.uncommenced="0"><no>Division 6</no><heading id="ch.8-pt.1-div.6-he" guid="_94c38771-81a7-4822-a88d-bf76d47517a6">Enforcement and dispute resolution</heading><clause id="sec.309" guid="_c36977d8-bf88-4b60-9605-e154d6ea32ea" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>309</no><heading id="sec.309-he" guid="_33a6a9fe-6791-4296-baa9-0e1ea9b525b0">Committee</heading><block status="uncommenced"><txt break.before="1">On the commencement, a building and development dispute resolution committee under the old Act becomes a tribunal under this Act.</txt></block></clause><clause id="sec.310" guid="_5caac304-0393-4ccc-867d-71fce00297d8" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>310</no><heading id="sec.310-he" guid="_d51f0ec7-3cee-4284-9124-41589ad286b8">Show cause notices and enforcement notices</heading><block status="uncommenced"><txt break.before="1">An enforcement authority may give a show cause notice under section 167, or an enforcement notice under section 168, as if a reference to a development offence in the section included a reference to a development offence under the old Act.</txt></block></clause><clause id="sec.311" guid="_058b0ecd-052a-402a-8e09-d7205b38b24e" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>311</no><heading id="sec.311-he" guid="_97e36e34-f09b-46ae-934f-c49ba8f47d2b">Proceedings generally</heading><subclause id="sec.311-ssec.1" guid="_0e570841-f032-44f4-831d-cc04bdad987e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">Subject to section 312, this section applies to a matter under the old Act, if a person—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.311-ssec.1-para1.a" guid="_cf5acaf8-fd18-4f55-8d8c-871a671c785c" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">had started proceedings before the commencement but the proceedings had not ended before the commencement; or</txt></block></li><li id="sec.311-ssec.1-para1.b" guid="_86d62eec-19dd-4cd6-935e-c2bc64cdb276" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">had, immediately before the commencement, a right to start proceedings; or</txt></block></li><li id="sec.311-ssec.1-para1.c" guid="_9474edb5-42ff-4435-907d-cf84190820bd" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">has a right to start proceedings that arises after the commencement in relation to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.311-ssec.1-para1.c-para2.i" guid="_027a7bb0-8137-4eb2-9b87-21b41426de1f" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a statutory instrument mentioned in section 287; or</txt></block></li><li id="sec.311-ssec.1-para1.c-para2.ii" guid="_b0fbb6c7-7c4e-4cf5-b1af-f0d216208288" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">an application mentioned in section 288.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.311-ssec.2" guid="_bf9fcec0-2309-4897-9a93-acf352ab9aa2" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">For proceedings that were started in the Planning and Environment Court, Magistrates Court or the Court of Appeal—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.311-ssec.2-para1.a" guid="_6cbf06de-5b99-4a57-b219-ec26cb9bb4b1" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the old Act continues to apply to the proceedings; and</txt></block></li><li id="sec.311-ssec.2-para1.b" guid="_36eccfe0-3c94-46de-af5a-2af0bfc05f7f" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">this Act applies to any appeal in relation to the proceedings as if the matter giving rise to the appeal happened under this Act.</txt></block></li></list></block></subclause><subclause id="sec.311-ssec.3" guid="_dcb21af1-63af-418d-a39c-d0e8b117c968" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">For proceedings that were started in a building and development committee—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.311-ssec.3-para1.a" guid="_07884dd6-edc3-4cff-b9ae-d54aaad6372a" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if the committee had been established before the old Act was repealed—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.311-ssec.3-para1.a-para2.i" guid="_60dd3291-8c0b-4ef5-a579-aba0666181fd" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the old Act continues to apply to the proceedings; and</txt></block></li><li id="sec.311-ssec.3-para1.a-para2.ii" guid="_b1a0dcf3-09d4-4088-b112-26b5c369d751" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">this Act applies to any appeal in relation to the proceedings; and</txt></block></li><li id="sec.311-ssec.3-para1.a-para2.iii" guid="_415aa9df-a678-4739-bf86-53990e87d987" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">the committee must continue to hear the proceedings despite the repeal of the old Act; or</txt></block></li></list></block></li><li id="sec.311-ssec.3-para1.b" guid="_daf8d4bd-815f-4bbb-9d27-910798ea131c" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the committee had not been established before the old Act was repealed—this Act applies to the proceedings, and any appeal in relation to the proceedings.</txt></block></li></list></block></subclause><subclause id="sec.311-ssec.4" guid="_fcb37c6f-21ff-417c-8042-1812a0b9fc98" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">For proceedings mentioned in subsection (1)(b) or (c), proceedings may be brought only under this Act.</txt></block></subclause></clause><clause id="sec.312" guid="_d47c11ce-48b6-439d-a4d5-662e20385360" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>312</no><heading id="sec.312-he" guid="_9a655814-b409-4dd0-85b1-49b986e43695">Particular proceedings</heading><subclause id="sec.312-ssec.1" guid="_8647f8f4-daa6-4e08-a432-2d3842aefa77" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">Despite section 311, for a matter under the old Act stated in column 1 of the table, a person may bring a proceeding under the section of the old Act stated in column 2, after the commencement, whether the matter happened before or after the commencement.</txt></block><block status="uncommenced"><table frame="all" colsep="0" rowsep="0" orient="port" id="sec.312-ssec.1-tbl" guid="_c3fddcb8-a634-47e4-acb4-71d043836b03" heading.align="left" font.size="12.pt"><tgroup cols="2" colsep="0" rowsep="0" tgroupstyle="Unruled3column"><colspec colnum="1" colname="1" colwidth="2.917in" colsep="0"/><colspec colnum="2" colname="2" colwidth="2.083in" colsep="0"/><thead><row rowsep="0" id="sec.312-ssec.1-tbl-tblh-tblr" guid="_357c378b-f4dd-433f-a0dd-b5f06342d808"><entry colname="1" colsep="1" id="sec.312-ssec.1-tbl-tblh-tblr-tble1" guid="_8ae4cf75-7990-44ac-9c49-4b2af4b3de39"><block status="uncommenced"><txt break.before="1">Column 1</txt><txt break.before="1">Matter under the old Act</txt></block></entry><entry colname="2" id="sec.312-ssec.1-tbl-tblh-tblr-tble2" guid="_a36e172d-8fb3-4c9d-a564-833e58fdbfd1"><block status="uncommenced"><txt break.before="1">Column 2</txt><txt break.before="1">Section of the old Act</txt></block></entry></row></thead><tbody><row rowsep="1" id="sec.312-ssec.1-tbl-tblr" guid="_44708941-7f57-4b07-84fa-503a7898a952"><entry colname="1" colsep="1" id="sec.312-ssec.1-tbl-tblr-tble1" guid="_cfacfc76-65e7-439a-9ac1-d25c444fb99f"><block status="uncommenced"><txt break.before="1">A decision under the old Act, section 98, about extending a period for starting development under a superseded planning scheme</txt></block></entry><entry colname="2" id="sec.312-ssec.1-tbl-tblr-tble2" guid="_b520d11d-ddda-493e-b6ee-07c02879720c"><block status="uncommenced"><txt break.before="1">Section 472</txt></block></entry></row><row rowsep="1" id="sec.312-ssec.1-tbl-tblr-oc.2" guid="_2e4872e5-edb3-48c9-baa3-e29d79433c1f"><entry colname="1" colsep="1" id="sec.312-ssec.1-tbl-tblr-oc.2-tble1" guid="_52077e67-8853-45fe-ac47-3353cb3f08df"><block status="uncommenced"><txt break.before="1">A decision under the old Act, chapter 5, part 6, about a request for acquisition of premises under hardship</txt></block></entry><entry colname="2" id="sec.312-ssec.1-tbl-tblr-oc.2-tble2" guid="_571e8584-44d0-488a-967d-4e868fd423a3"><block status="uncommenced"><txt break.before="1">Section 477</txt></block></entry></row><row rowsep="1" id="sec.312-ssec.1-tbl-tblr-oc.3" guid="_8df5eafa-4295-4816-8180-c5f969baa7b3"><entry colname="1" colsep="1" id="sec.312-ssec.1-tbl-tblr-oc.3-tble1" guid="_956f0459-12b6-4b93-a7af-cffbf4f46f1e"><block status="uncommenced"><txt break.before="1">An action notice given under the old Act, section 405</txt></block></entry><entry colname="2" id="sec.312-ssec.1-tbl-tblr-oc.3-tble2" guid="_6a2147e3-ae50-429f-851a-e5ae799e4373"><block status="uncommenced"><txt break.before="1">Section 468</txt></block></entry></row><row rowsep="1" id="sec.312-ssec.1-tbl-tblr-oc.4" guid="_35b50332-1421-4a63-a45a-db09b45fa0b8"><entry colname="1" colsep="1" id="sec.312-ssec.1-tbl-tblr-oc.4-tble1" guid="_94c231af-2a80-4538-980e-c951de0ab4ad"><block status="uncommenced"><txt break.before="1">A decision to impose a condition on a compliance certificate under the old Act, section 407</txt></block></entry><entry colname="2" id="sec.312-ssec.1-tbl-tblr-oc.4-tble2" guid="_5ed814c9-9492-4dee-96f8-ebb2f4408954"><block status="uncommenced"><txt break.before="1">Section 469</txt></block></entry></row><row rowsep="1" id="sec.312-ssec.1-tbl-tblr-oc.5" guid="_e86e39ec-8c76-4a92-b95e-e64ca259912d"><entry colname="1" colsep="1" id="sec.312-ssec.1-tbl-tblr-oc.5-tble1" guid="_4a9b134f-050d-4f59-962b-9d916bace4d0"><block status="uncommenced"><txt break.before="1">A decision under the old Act, section 412, about a request to change or withdraw an action notice</txt></block></entry><entry colname="2" id="sec.312-ssec.1-tbl-tblr-oc.5-tble2" guid="_0ee601af-7b2c-4640-ae9e-df9340fc5067"><block status="uncommenced"><txt break.before="1">Section 470(1)(a)</txt></block></entry></row><row rowsep="1" id="sec.312-ssec.1-tbl-tblr-oc.6" guid="_85a050ec-ecf7-49c0-a872-701e345017b3"><entry colname="1" colsep="1" id="sec.312-ssec.1-tbl-tblr-oc.6-tble1" guid="_a93999ea-27aa-4bd8-8f6e-57d53fd17144"><block status="uncommenced"><txt break.before="1">A decision under the old Act, section 413, about changing a compliance certificate</txt></block></entry><entry colname="2" id="sec.312-ssec.1-tbl-tblr-oc.6-tble2" guid="_20b1a1fe-e055-4cb7-b4f3-b622e8e3042c"><block status="uncommenced"><txt break.before="1">Section 470(1)(b)</txt></block></entry></row><row rowsep="1" id="sec.312-ssec.1-tbl-tblr-oc.7" guid="_27311745-dd4b-4b74-86a3-566f3214613c"><entry colname="1" colsep="1" id="sec.312-ssec.1-tbl-tblr-oc.7-tble1" guid="_9898fb9b-d9a7-4cf9-a93f-4664435f3163"><block status="uncommenced"><txt break.before="1">A decision under the old Act, section 710 or 716, about a claim for compensation</txt></block></entry><entry colname="2" id="sec.312-ssec.1-tbl-tblr-oc.7-tble2" guid="_660ca5b8-ae5c-439f-8471-1875ee02904e"><block status="uncommenced"><txt break.before="1">Section 476</txt></block></entry></row><row rowsep="0" id="sec.312-ssec.1-tbl-tblr-oc.8" guid="_18fbd54e-fbc7-4c70-81fa-3ca3ff3a6cf7"><entry colname="1" colsep="1" id="sec.312-ssec.1-tbl-tblr-oc.8-tble1" guid="_7e146340-97d1-448e-9ffa-bbbc2438e0dc"><block status="uncommenced"><txt break.before="1">A declaratory matter in relation to an application to which section 287 of this Act applies</txt></block></entry><entry colname="2" id="sec.312-ssec.1-tbl-tblr-oc.8-tble2" guid="_bdb39592-9f1f-4fb6-ba4b-7550f0e8c85d"><block status="uncommenced"><txt break.before="1">Sections 510 to 513</txt></block></entry></row></tbody></tgroup></table></block></subclause><subclause id="sec.312-ssec.2" guid="_ff79850b-d8bf-4e84-b924-6915548423ce" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The old Act applies to the proceedings and any appeal in relation to the proceedings.</txt></block></subclause><subclause id="sec.312-ssec.3" guid="_bd4f1ccc-5842-4164-94e9-5aaee77c11d5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">However, the <legref jurisd="QLD" type="act" check="unknown">P&#38;E Court Act</legref>, section 76(6) and (7), applies to the proceedings.</txt></block></subclause></clause></division><division id="ch.8-pt.1-div.7" guid="_9ea9dce2-2f35-424f-b4a5-bb1454bc0e66" affected.by.uncommenced="0"><no>Division 7</no><heading id="ch.8-pt.1-div.7-he" guid="_d08b28f3-3c31-48a8-954e-887b605625ae">Miscellaneous</heading><clause id="sec.313" guid="_d46f4a92-78cb-412a-a687-5aa21f0dd6f8" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>313</no><heading id="sec.313-he" guid="_b0a57bb0-675d-40b9-9560-3f607c4559de">Keeping documents</heading><subclause id="sec.313-ssec.1" guid="_fcc08ee6-9de8-45e9-a396-ab848dbba2c9" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">A document required to be kept for inspection and purchase under the old Act must be kept for inspection and purchase under this Act.</txt></block></subclause><subclause id="sec.313-ssec.2" guid="_5aeea890-3301-49c4-84c0-192473ec116d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">A document required to be kept for inspection only under the old Act must be kept for inspection only under this Act.</txt></block></subclause><subclause id="sec.313-ssec.3" guid="_2308ac73-4989-46e8-9e55-78041aa99200" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The old Act, section 736, continues to apply to a document to which the section applied immediately before the commencement.</txt></block></subclause></clause><clause id="sec.314" guid="_33edaa10-3fbd-426c-8094-5f7f135999c1" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>314</no><heading id="sec.314-he" guid="_bdb691ec-d864-42d1-982f-f3cec0a11e70">Structure plans</heading><subclause id="sec.314-ssec.1" guid="_27451437-077a-40da-b1d0-3d0793c87fe8" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">To remove any doubt, it is declared that each structure plan made by the Sunshine Coast Regional Council stopped having effect on 21 May 2014.</txt></block></subclause><subclause id="sec.314-ssec.2" guid="_a40a923b-3db6-41de-8cdc-b7ef12e533d2" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">A structure plan made by the Gold Coast City Council or Redland City Council stops having effect when a planning scheme stated in subsection (3) is made.</txt></block></subclause><subclause id="sec.314-ssec.3" guid="_e40b881c-400e-4129-9edb-a323ec12d658" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The Gold Coast City Council or Redland City Council may make a planning scheme in relation to a declared master planned area under the old Act after the Minister notifies the council that the Minister considers the planning scheme—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.314-ssec.3-para1.a" guid="_d0bb2a34-23ed-4304-9eea-37b2f1f61f10" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">is consistent with the strategic intent of the structure plan for the declared master planned area; and</txt></block></li><li id="sec.314-ssec.3-para1.b" guid="_5b2464cc-585e-4cd8-bb79-d9a7bc23fa7a" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">does not affect the development entitlements or development responsibilities, in the structure plan, in an adverse and material way.</txt></block></li></list></block></subclause><subclause id="sec.314-ssec.4" guid="_13517fa4-5b1f-44e1-b6d6-3d02f54e5f86" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The Cairns Regional Council or Moreton Bay Regional Council may make a planning scheme in relation to a declared master planned area under the old Act after the Minister notifies the council that the Minister considers the planning scheme addresses the matters in the old Act, section 761A(4).</txt></block></subclause><subclause id="sec.314-ssec.5" guid="_7e8797f4-464d-4cf7-89ca-ce2fef6204d6" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">An agreement (a <defterm id="sec.314-def.fundingagreement" guid="_8ccc46ba-2462-4d6c-a545-4a7fe7c05157" type="definition">funding agreement</defterm>) to fund the preparation of a structure plan under the unamended old Act, section 143, is not cancelled just because of the repeal of the old Act.</txt></block></subclause><subclause id="sec.314-ssec.6" guid="_cfdae0ea-b340-4832-9f24-36785f6dcd45" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">A local government may apply funds received under a funding agreement to fulfil the local government’s responsibilities under subsections (3) or (4), as required by the local government’s policy under the unamended old Act, section 143(2).</txt></block></subclause><subclause id="sec.314-ssec.7" guid="_c2ee927d-2826-4d74-a6f0-a1c837546c22" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.314-ssec.7-def.structureplan_" guid="_e6ac721a-ebd1-4b46-b606-bfef4119f35a" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.314-ssec.7-def.structureplan" guid="_b28045fc-5c03-4c67-abe9-c019af703e45" type="definition">structure plan</defterm> means a structure plan made under the old Act, chapter 4, as in force on 21 November 2012.</txt></definition><definition id="sec.314-ssec.7-def.unamendedoldAct_" guid="_8b3e4ba8-2d41-4563-8925-6308441a3565" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.314-ssec.7-def.unamendedoldAct" guid="_42974c0a-1920-4363-9206-8489f891098f" type="definition">unamended old Act</defterm> means the old Act as in force on 21 November 2012.</txt></definition></deflist></block></subclause></clause><clause id="sec.315" guid="_d2edb496-ea1a-4ca0-905b-7c77dd8e4c54" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>315</no><heading id="sec.315-he" guid="_de32deab-bea2-43da-8bcf-b2bc0b284983">Master plans</heading><subclause id="sec.315-ssec.1" guid="_d5acfca8-598f-43f1-a6ec-116ef4f53c41" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to a master plan that is in force when the old Act is repealed.</txt></block></subclause><subclause id="sec.315-ssec.2" guid="_51d1920f-c01b-480b-861e-cabec030388e" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The master plan continues to have effect until the time stated in the old Act, section 907(a) or (b).</txt></block></subclause><subclause id="sec.315-ssec.3" guid="_8504607d-165d-4b65-8d31-74ed4d080070" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">The following provisions of this Act apply to the master plan as if the master plan were a local planning instrument—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.315-ssec.3-para1.a" guid="_114bef4b-2194-4dd1-ad39-2f5ec58e30f5" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">section 8(4)(a) and (b);</txt></block></li><li id="sec.315-ssec.3-para1.b" guid="_a44b4309-563f-4076-a424-cd78b5909610" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">section 36(7)(a);</txt></block></li><li id="sec.315-ssec.3-para1.c" guid="_008948aa-9e90-41cb-8f66-8d2872452c36" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">section 263(1)(a);</txt></block></li><li id="sec.315-ssec.3-para1.d" guid="_132e3fbf-569f-473e-9e29-9369d364e8f8" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">section 264.</txt></block></li></list></block></subclause><subclause id="sec.315-ssec.4" guid="_965a5ed2-4711-4c57-9b7b-764a3b57dd61" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">A provision of this Act that relates to a categorising instrument applies to the master plan as if the master plan were a local categorising instrument.</txt></block></subclause><subclause id="sec.315-ssec.5" guid="_a21cba41-7c12-4f7a-b7ee-c9f2981bf53d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">The following provisions of this Act apply to the master plan as if the master plan were a development approval for the land in the master planning unit—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.315-ssec.5-para1.a" guid="_b028ff8e-c633-44a9-a2d6-d9df798af90f" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">section 73;</txt></block></li><li id="sec.315-ssec.5-para1.b" guid="_142efdc9-ed74-4fb2-a673-95a2ead8b9c0" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">section 89;</txt></block></li><li id="sec.315-ssec.5-para1.c" guid="_a1647807-7f05-4fac-acf9-4053ee9793d1" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">section 157(1)(a);</txt></block></li><li id="sec.315-ssec.5-para1.d" guid="_b3044f4b-0382-4665-b319-175fc7fe4ac7" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">section 164;</txt></block></li><li id="sec.315-ssec.5-para1.e" guid="_c55ff10f-6fb4-4724-9cfb-998653d246f6" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">section 168(4)(b);</txt></block></li><li id="sec.315-ssec.5-para1.f" guid="_9cceb6f2-e5c3-454c-afef-5e1e5dd5b35a" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">section 263(1)(b).</txt></block></li></list></block></subclause><subclause id="sec.315-ssec.6" guid="_0f3621d3-cae0-4c1d-a009-2694a5a66314" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">To the extent of any inconsistency, the master plan applies instead of—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.315-ssec.6-para1.a" guid="_1852a0b4-a82c-423a-bb4b-e965fe080650" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a local planning instrument; or</txt></block></li><li id="sec.315-ssec.6-para1.b" guid="_9ad706ab-229a-4b30-a390-6bb09f869f26" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a condition decided under the repealed <legref jurisd="QLD" type="act" check="unknown">LGP&#38;E Act</legref>, section 2.19(3)(a); or</txt></block></li><li id="sec.315-ssec.6-para1.c" guid="_c9751686-c5ad-47ae-97cf-d9f1811daf9b" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">a condition of an approval given under the repealed <legref jurisd="QLD" type="act" check="unknown">LGP&#38;E Act</legref>, section 4.4(5).</txt></block></li></list></block></subclause><subclause id="sec.315-ssec.7" guid="_c07ce1cf-891c-441a-b423-d3952c8e3310" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">An agreement about the master plan under the unamended old Act, section 193, is not cancelled just because of the repeal of the old Act.</txt></block></subclause><subclause id="sec.315-ssec.8" guid="_fd9efb08-6175-4a27-9a6b-d3612ba8eb0c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(8)</no><block status="uncommenced"><txt break.before="1">A certified copy of the master plan is evidence of the content of the master plan.</txt></block></subclause><subclause id="sec.315-ssec.9" guid="_b838422f-1c08-43f3-bac6-5979b8c8d54b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(9)</no><block status="uncommenced"><txt break.before="1">After the commencement, the master plan may be amended or cancelled as required under the unamended old Act, chapter 4, part 3, divisions 3 and 4.</txt></block></subclause><subclause id="sec.315-ssec.10" guid="_aa2dc4c7-e092-4678-9e9b-fbb54bbecf71" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(10)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.315-ssec.10-def.masterplan_" guid="_3010ac47-d0b7-46ad-906e-72efc1260ed5" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.315-ssec.10-def.masterplan" guid="_b38eb191-b6a3-409e-ae37-2a8fd185daa6" type="definition">master plan</defterm> means a master plan under the unamended old Act.</txt></definition><definition id="sec.315-ssec.10-def.masterplanningunit_" guid="_4b8f60f4-22e2-4bca-ae3e-1fab45cb7bf8" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.315-ssec.10-def.masterplanningunit" guid="_33d02f62-97d5-4d4a-bdf2-231a8d4dc3a5" type="definition">master planning unit</defterm> means a master planning unit under the unamended old Act.</txt></definition><definition id="sec.315-ssec.10-def.unamendedoldAct_" guid="_f0a92657-8221-465e-a2bf-46cfc3341960" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.315-ssec.10-def.unamendedoldAct" guid="_54e07b8b-05de-4365-ae17-4548706a848d" type="definition">unamended old Act</defterm> means the old Act as in force on 21 November 2012.</txt></definition></deflist></block></subclause></clause><clause id="sec.316" guid="_4e552594-5f26-43fa-9843-0bbe92a46a78" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>316</no><heading id="sec.316-he" guid="_81fc5508-5d46-4cd9-bcaf-a47e80b00810">Development control plans</heading><subclause id="sec.316-ssec.1" guid="_f715b23a-521d-4743-982b-a01c37b7cdff" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The old Act, section 86(4), continues to apply to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.316-ssec.1-para1.a" guid="_6de2b17a-5fe2-409f-a358-1e2787d34479" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the Ipswich City Council’s Springfield Structure Plan; and</txt></block></li><li id="sec.316-ssec.1-para1.b" guid="_b7d388c9-1b1b-4def-bb39-d8453ea394f6" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the Moreton Bay Regional Council’s Mango Hill Infrastructure Development Control Plan; and</txt></block></li><li id="sec.316-ssec.1-para1.c" guid="_506489f8-65e8-4572-b4cb-48e028563bf6" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the Sunshine Coast Regional Council’s Development Control Plan 1 Kawana Waters.</txt></block></li></list></block></subclause><subclause id="sec.316-ssec.2" guid="_9671bc19-69d8-4544-a6af-07a88c304d6a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The old Act, section 857—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.316-ssec.2-para1.a" guid="_0e73204e-302e-4c72-acd4-b116d20759a8" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">continues to apply to a development control plan stated in the old Act, section 857(1), until the plan is applied or adopted under the old Act, section 86(4); and</txt></block></li><li id="sec.316-ssec.2-para1.b" guid="_81e73e6a-4403-440f-83f2-ef7312764eb6" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">applies to a development control plan applied or adopted under the old Act, section 86(4), whether before or after the commencement.</txt></block></li></list></block></subclause><subclause id="sec.316-ssec.3" guid="_7a753476-e7e3-40f6-a325-e5a179a6f36b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">However, the old Act, section 857, applies as if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.316-ssec.3-para1.a" guid="_6218c7ee-8ed2-4c6c-8502-d961f60d2499" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">section 857(6) referred to this Act as well as to the ‘repealed IPA and this Act’; and</txt></block></li><li id="sec.316-ssec.3-para1.b" guid="_c81b6a7e-1631-4e16-98ce-6271257b32ad" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">section 857(7) referred to chapter 3 of this Act, or an instrument made under section 16 of this Act, instead of to ‘chapter 6 or a guideline made under section 117(1)’; and</txt></block></li><li id="sec.316-ssec.3-para1.c" guid="_91ebcfc1-03b0-4765-b204-880574058363" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">section 857(8) and (9) referred to a planning scheme under this Act as well as to a ‘transitional planning scheme’; and</txt></block></li><li id="sec.316-ssec.3-para1.d" guid="_7d37d166-3222-4093-995c-760ac1017950" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">section 857(10) referred to a planning scheme policy under this Act as well as to a ‘transitional planning scheme policy’.</txt></block></li></list></block></subclause><subclause id="sec.316-ssec.4" guid="_592f1888-2c2c-4dc1-96f6-cf01ff121880" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">The Minister’s powers under chapter 3, part 7 of this Act apply to a plan or an amendment to a plan under the old Act, section 857(5), as if—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.316-ssec.4-para1.a" guid="_85905bc1-7a5d-46a5-843f-016394b9f222" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the process for making the plan were the development assessment process for a development application; and</txt></block></li><li id="sec.316-ssec.4-para1.b" guid="_d8323ffe-5408-4f6a-8541-19d602fc8599" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the plan or amendment were a development approval; and</txt></block></li><li id="sec.316-ssec.4-para1.c" guid="_405909a9-daf3-4c6c-9c56-a1aaaeaddb9c" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the local government were the assessment manager for the development application for the approval.</txt></block></li></list></block></subclause></clause><clause id="sec.317" guid="_677a8814-0137-4063-8045-d70baa9fa0b4" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>317</no><heading id="sec.317-he" guid="_0c8b8630-80e5-47e5-8226-9207d14499e2">Rezoning approval conditions</heading><subclause id="sec.317-ssec.1" guid="_8b938b97-f459-49d9-ba91-e4ec02fab1a9" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to the following conditions (a <defterm id="sec.317-def.rezoningcondition" guid="_87c594a6-5a4b-4403-8e53-70678e465f6d" type="definition">rezoning condition</defterm>)—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.317-ssec.1-para1.a" guid="_54ece9d2-ca31-430c-96af-88a15c356bc3" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a condition decided under the repealed <legref jurisd="QLD" type="act" check="unknown">LGP&#38;E Act</legref>, section 2.19(3)(a);</txt></block></li><li id="sec.317-ssec.1-para1.b" guid="_225dfedc-aae0-4355-85eb-72043304f096" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a condition of an approval given under the repealed <legref jurisd="QLD" type="act" check="unknown">LGP&#38;E Act</legref>, section 4.4(5).</txt></block></li></list></block></subclause><subclause id="sec.317-ssec.2" guid="_a655a29e-b4dd-4b7d-9153-bbc5208b4595" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">If a person wants to change a rezoning condition, the person must make a change application under this Act as if the rezoning condition had been imposed by the local government as assessment manager.</txt></block></subclause><subclause id="sec.317-ssec.3" guid="_67cc680b-7381-429f-8bd9-247bc7518df1" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">A development approval applies instead of a rezoning condition, to the extent of any inconsistency.</txt></block></subclause></clause><clause id="sec.318" guid="_8f93a125-e836-4ec3-9a56-4b4dfe430f35" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>318</no><heading id="sec.318-he" guid="_6f6dfe45-fb0f-4626-8498-3224edc4dc52">Rezoning approval agreements</heading><subclause id="sec.318-ssec.1" guid="_bb564c09-e188-44f4-9169-b25a91303e7d" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to an agreement made, before the commencement, for securing the conditions of a rezoning approval if the conditions did not attach to the land that is the subject of the approval and bind successors in title.</txt></block></subclause><subclause id="sec.318-ssec.2" guid="_759baa0a-1799-415f-9255-c927009eee55" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">Nothing in this Act, or the repealed planning legislation, affects the agreement, to the extent the agreement—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.318-ssec.2-para1.a" guid="_12b86f54-a6ff-42aa-9388-1d144b56f182" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">was validly made; and</txt></block></li><li id="sec.318-ssec.2-para1.b" guid="_b7f6468c-37c3-4069-b471-458be7ae4186" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">was in force when the old Act was repealed; and</txt></block></li><li id="sec.318-ssec.2-para1.c" guid="_1771861b-5c98-435a-8933-9f9f172f425a" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">is not inconsistent with a development condition.</txt></block></li></list></block></subclause><subclause id="sec.318-ssec.3" guid="_89814f4e-01af-46ea-a4f8-08b5f94cb741" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">Any amount that was paid, or is payable, in relation to infrastructure under the agreement must be taken into account by—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.318-ssec.3-para1.a" guid="_bcb3f5f5-23b3-412a-9eb1-7fac32b7fc7e" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">an assessment manager in imposing a condition under this Act about infrastructure; and</txt></block></li><li id="sec.318-ssec.3-para1.b" guid="_bc08dc2a-d9a8-44c6-8e7d-aabf0d1f3368" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a local government in levying an infrastructure charge under chapter 4, part 2.</txt></block></li></list></block></subclause><subclause id="sec.318-ssec.4" guid="_4305b132-4db2-4d60-aca3-0ce83c09127b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">In this section—</txt><deflist><definition id="sec.318-ssec.4-def.repealedplanninglegislation_" guid="_2cf65ee8-d2a7-4c57-8b2b-60537099a79d" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.318-ssec.4-def.repealedplanninglegislation" guid="_edbcbeaa-4ffa-44ad-9abf-396f5ee00667" type="definition">repealed planning legislation</defterm> means—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.318-ssec.4-def.repealedplanninglegislation-para1.a" guid="_4cd3b6d6-dff9-45c0-890f-6a8056336fc3" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the repealed <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Local Government Act 1936</name></legref>; or</txt></block></li><li id="sec.318-ssec.4-def.repealedplanninglegislation-para1.b" guid="_b3619b63-449a-4c58-9d60-a7f06ccf8460" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the repealed <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">City of Brisbane Town Planning Act 1964</name></legref>; or</txt></block></li><li id="sec.318-ssec.4-def.repealedplanninglegislation-para1.c" guid="_5b9f15df-17c1-4bad-86cc-c1c1f488a2d1" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the repealed <legref jurisd="QLD" type="act" check="unknown">LGP&#38;E Act</legref>; or</txt></block></li><li id="sec.318-ssec.4-def.repealedplanninglegislation-para1.d" guid="_613e4b42-72b5-475c-9161-10a10b84a6a5" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">the repealed <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Integrated Planning Act 1997</name></legref>; or</txt></block></li><li id="sec.318-ssec.4-def.repealedplanninglegislation-para1.e" guid="_f372ce30-f624-4f09-9eb8-290ed22bddf8" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">the old Act.</txt></block></li></list></definition><definition id="sec.318-ssec.4-def.rezoningapproval_" guid="_4a693e76-c26c-4dac-b0da-ad54375d469c" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.318-ssec.4-def.rezoningapproval" guid="_5217b12d-dc9c-477c-813a-0c23d08f9a7e" type="definition">rezoning approval</defterm> means an approval decided or given under—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.318-ssec.4-def.rezoningapproval-para1.a" guid="_60b1a1c2-8f15-41c4-9654-b636366c4494" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the repealed <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Local Government Act 1936</name></legref>, section 33(6A); or</txt></block></li><li id="sec.318-ssec.4-def.rezoningapproval-para1.b" guid="_7d38daf7-1ce1-4863-9585-7856e949344a" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the repealed <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">City of Brisbane Town Planning Act 1964</name></legref>; or</txt></block></li><li id="sec.318-ssec.4-def.rezoningapproval-para1.c" guid="_e9da51b4-a761-457b-bf5c-c17d0da31de8" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the repealed <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Integrated Planning Act 1997</name></legref>, section 6.1.26.</txt></block></li></list></definition></deflist></block></subclause></clause><clause id="sec.319" guid="_fff7ac1a-7193-4251-a463-3e9363d7b1b3" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>319</no><heading id="sec.319-he" guid="_532755c9-66dd-428a-a943-1674da9bd0ba">Compliance assessment of documents or works</heading><subclause id="sec.319-ssec.1" guid="_ce4f6378-eb02-470d-bc38-082337290af4" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">This section applies to—</txt><list number.type="default" unnumbered.indent="0"><li id="sec.319-ssec.1-para1.a" guid="_12e23627-0d9f-4987-a9ec-d93c0cf45c56" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a document or works if, when the old Act was repealed, a development approval or local planning instrument required compliance assessment for the document or works; and</txt></block></li><li id="sec.319-ssec.1-para1.b" guid="_6617337e-3248-4dee-a8f9-8a14500169d9" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a compliance certificate given, before or after the commencement, under the old Act for a document or works.</txt></block></li></list></block></subclause><subclause id="sec.319-ssec.2" guid="_0f0308f4-b2f7-40d7-a2d8-c4a15b2d174a" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The old Act, chapter 6, part 10, continues to apply in relation to the document, works or certificate.</txt></block></subclause></clause><clause id="sec.320" guid="_08142e41-98bd-46a2-b157-2c5b6cf6a14f" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>320</no><heading id="sec.320-he" guid="_8f4953cb-82f5-463d-a47e-81048933dc07">Public housing development</heading><block status="uncommenced"><txt break.before="1">The old Act, chapter 9, part 5, continues to apply to development for public housing if, before the commencement, the chief executive under the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Housing Act 2003</name></legref> has complied with the old Act, section 721(2)(a), for the development.</txt></block></clause><clause id="sec.321" guid="_34427a81-b8fb-4e70-855d-f5700a221031" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>321</no><heading id="sec.321-he" guid="_bb14916d-7883-4520-884f-843a6705a045">LGP&#38;E Act approvals</heading><block status="uncommenced"><txt break.before="1">For section 164, a development approval includes an approval under the repealed LGP&#38;E Act, section 4.4(5) or 4.7(5).</txt></block></clause><clause id="sec.322" guid="_e818fb87-a932-4b9e-bae2-61604edf0750" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>322</no><heading id="sec.322-he" guid="_68bb134f-606c-4fa0-bd2a-d534497fe457">Milton XXXX Brewery</heading><subclause id="sec.322-ssec.1" guid="_794f013a-02dc-4e1b-8495-1e416b9abedb" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The brewery on lot 35 on plan SL805565 is taken to be registered under section 267 from 27 April 2009 until 26 April 2019.</txt></block></subclause><subclause id="sec.322-ssec.2" guid="_addad961-3786-4fe1-90e0-dcbec6436f5b" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">The Milton rail precinct is the affected area to which the registration relates.</txt></block></subclause><subclause id="sec.322-ssec.3" guid="_1395b029-c6e1-4264-a111-4698405dae14" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">Section 269(3) to (8) applies to the brewery only for a renewal of the registration.</txt></block></subclause><subclause id="sec.322-ssec.4" guid="_c81c592f-a9ef-4444-82ee-c87661383e09" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">Section 274(2) applies to a claim relating to an emission of light only if the intensity of the light is more than the intensity of light emitted before 27 April 2009.</txt></block></subclause><subclause id="sec.322-ssec.5" guid="_03625187-1635-41af-931f-d3655c44137c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">Section 269(2), and schedule 1, table 2, item 5, do not apply in relation to the brewery.</txt></block></subclause></clause><clause id="sec.323" guid="_c6a9f773-d18b-4005-bde2-59bca447663a" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>323</no><heading id="sec.323-he" guid="_e2d69e27-d281-426b-815d-a7b7c78ff1de">Transitional regulation-making power</heading><subclause id="sec.323-ssec.1" guid="_38d0a1c9-44f2-4d0b-a276-e7d4038b2242" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">The Governor in Council may make a regulation (a <defterm id="sec.323-def.transitionalregulation" guid="_62b408fa-75be-442f-b348-bdf1650bb4cd" type="definition">transitional regulation</defterm>) providing for anything that is necessary to enable or facilitate the transition from the old Act to this Act and the P&#38;E Court Act.</txt></block></subclause><subclause id="sec.323-ssec.2" guid="_fadeaf43-561b-4e8d-8f7b-c8f5cb16e3e9" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">A transitional regulation may have retrospective operation to a time that is no earlier than when the old Act was repealed.</txt></block></subclause><subclause id="sec.323-ssec.3" guid="_82cc6b63-1727-49b6-a5d7-30a7f55685d0" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">A transitional regulation must declare it is a transitional regulation.</txt></block></subclause><subclause id="sec.323-ssec.4" guid="_f9d536ef-8063-45cf-adab-960ce944e5de" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">This section and any transitional regulation stop having effect 5 years after the old Act was repealed.</txt></block></subclause></clause><clause id="sec.324" guid="_6b72253f-bc8c-4e6d-bf6b-e930c32a536f" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>324</no><heading id="sec.324-he" guid="_e4fa0509-8280-4ac4-b7c8-fadf9afe8e96">Amendment to renumber</heading><subclause id="sec.324-ssec.1" guid="_7967692a-819c-4ba5-80b1-0503117acd22" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="1">On the commencement of this section, the provisions of this Act are amended by numbering and renumbering them in the same way as a reprint may be numbered and renumbered under the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Reprints Act 1992</name></legref>, section 43.</txt></block></subclause><subclause id="sec.324-ssec.2" guid="_6e4dc8ec-58d5-4b0a-a63f-bc8dc4d4ea49" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="1">Each reference in this Act, or in another Act, to a provision of this Act renumbered under subsection (1), is amended, when the renumbering happens, by omitting the reference to the previous number and inserting the new number.</txt></block></subclause><subclause id="sec.324-ssec.3" guid="_982982cf-7337-4c2e-ab30-bb0a7ef89558" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="1">This section does not limit the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Acts Interpretation Act 1954</name></legref>, section 14H, or the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Reprints Act 1992</name></legref>.</txt></block></subclause><subclause id="sec.324-ssec.4" guid="_43e714ed-dbbb-48a9-ae3b-f6286b4565fd" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="1">This section expires on the day after assent.</txt></block></subclause></clause></division></part><part id="ch.8-pt.2" guid="_c26cfaf8-19a4-4b10-954b-2495c802e1b7" status="uncommenced" affected.by.uncommenced="0"><no>Part 2</no><heading id="ch.8-pt.2-he" guid="_6a0087c1-98cb-4d61-8cad-4e780ad0f69d">Repeal provision</heading><clause id="sec.325" guid="_d3724eef-725d-4ad6-aaf6-e430d866976e" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>325</no><heading id="sec.325-he" guid="_cfc9086b-9942-4dc5-9216-970f1b6a17dd">Act repealed</heading><block status="uncommenced"><txt break.before="1">The <legref jurisd="QLD" type="act" check="unknown">Sustainable Planning Act 2009, No. 36</legref> is repealed.</txt></block></clause></part></chapter></body></wrapper><schedules affected.by.uncommenced="0" numbering.style="manual"><schedule id="sch.1" guid="_b27e6fb3-817d-489b-ba9f-f87df89be113" type="schedule" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" numbering.style="manual" provision.type="other"><no>Schedule 1</no><heading id="sch.1-he" guid="_55ec597a-07f0-439e-a525-4b6d6f1930b1">Appeals</heading><sourceref id="sch.1-ref" guid="_0a996e35-371c-4101-adb3-e264b9770718" status="uncommenced" affected.by.uncommenced="0">section 229</sourceref><clause id="sch.1-sec.1" guid="_e79cbd63-ba5c-415b-bc7d-9217dd599138" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>1</no><heading id="sch.1-sec.1-he" guid="_476822f9-c6be-4945-8219-9427761f0fcd">Appeal rights and parties to appeals</heading><subclause id="sch.1-sec.1-ssec.1" guid="_5f88aa0d-6786-4868-8992-157965a79a5f" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block status="uncommenced"><txt break.before="1">Table 1 states the matters that may be appealed to—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.1-sec.1-ssec.1-para1.a" guid="_1327dac4-b5a3-4c2e-bc72-b7166ad8ff8e" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the P&#38;E court; or</txt></block></li><li id="sch.1-sec.1-ssec.1-para1.b" guid="_59c4820a-415a-4819-9f00-17d2a07ffc75" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a tribunal.</txt></block></li></list></block></subclause><subclause id="sch.1-sec.1-ssec.2" guid="_871db562-ffe8-4ea3-937d-53fc7907f9de" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block status="uncommenced"><txt break.before="1">However, table 1 applies to a tribunal only if the matter involves—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.1-sec.1-ssec.2-para1.a" guid="_ffe94e0c-898c-4e89-9aba-68e5a39442bc" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the refusal, or deemed refusal of a development application, for—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.1-sec.1-ssec.2-para1.a-para2.i" guid="_9733b008-5890-4ea8-a3e8-4d31e76a2972" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a material change of use for a classified building; or</txt></block></li><li id="sch.1-sec.1-ssec.2-para1.a-para2.ii" guid="_0d4057f7-8f5c-4c5d-bdf7-ab63a0d8087e" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">operational work associated with building work, a retaining wall, or a tennis court; or</txt></block></li></list></block></li><li id="sch.1-sec.1-ssec.2-para1.b" guid="_12eef05b-81c5-43ba-8c50-7d2162d93d5e" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a provision of a development approval for—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.1-sec.1-ssec.2-para1.b-para2.i" guid="_437ac90b-7eff-47cc-aa88-01d3eec177b2" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a material change of use for a classified building; or</txt></block></li><li id="sch.1-sec.1-ssec.2-para1.b-para2.ii" guid="_88a4799d-7cca-4553-9940-40bee4590b45" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">operational work associated with building work, a retaining wall, or a tennis court; or</txt></block></li></list></block></li><li id="sch.1-sec.1-ssec.2-para1.c" guid="_9b74636e-be6f-4311-92c9-df1909ad1bd2" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">if a development permit was applied for—the decision to give a preliminary approval for—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.1-sec.1-ssec.2-para1.c-para2.i" guid="_35354dbf-6801-4e21-925e-0d3d1153af80" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a material change of use for a classified building; or</txt></block></li><li id="sch.1-sec.1-ssec.2-para1.c-para2.ii" guid="_fa7acb5a-1fe3-4b41-b15c-a790a9fd4744" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">operational work associated with building work, a retaining wall, or a tennis court; or</txt></block></li></list></block></li><li id="sch.1-sec.1-ssec.2-para1.d" guid="_752d8663-a27b-4f20-9e91-190007188aeb" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">a development condition if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.1-sec.1-ssec.2-para1.d-para2.i" guid="_9debb7cc-6bd5-4acb-834e-64800e2fdb03" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the development approval is only for a material change of use that involves the use of a building classified under the Building Code as a class 2 building; and</txt></block></li><li id="sch.1-sec.1-ssec.2-para1.d-para2.ii" guid="_f72eff11-ca9d-4042-a9df-2c28843e6ae1" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the building is, or is proposed to be, not more than 3 storeys; and</txt></block></li><li id="sch.1-sec.1-ssec.2-para1.d-para2.iii" guid="_8ab5e8eb-b853-4b71-9b76-59f4e1d2df0a" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">the proposed development is for not more than 60 sole-occupancy units; or</txt></block></li></list></block></li><li id="sch.1-sec.1-ssec.2-para1.e" guid="_ff63555e-fcec-4446-9287-b73863cec7f3" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">a decision for, or a deemed refusal of, an extension application for a development approval that is only for a material change of use of a classified building; or</txt></block></li><li id="sch.1-sec.1-ssec.2-para1.f" guid="_0487ba1e-3518-4536-9931-456b2d53021e" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">a decision for, or a deemed refusal of, a change application for a development approval that is only for a material change of use of a classified building; or</txt></block></li><li id="sch.1-sec.1-ssec.2-para1.g" guid="_a93247c0-bac0-4ef8-a2b8-2dafed7d16d2" status="uncommenced" provision.type="other"><no>(g)</no><block status="uncommenced"><txt break.before="1">a matter under this Act, to the extent the matter relates to—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.1-sec.1-ssec.2-para1.g-para2.i" guid="_8cc7982b-26b3-45ec-a694-a4fd8aa608db" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1"><legref jurisd="QLD" type="act" check="unknown">the Building Act</legref>, other than a matter under that Act that may or must be decided by the Queensland Building and Construction Commission; or</txt></block></li><li id="sch.1-sec.1-ssec.2-para1.g-para2.ii" guid="_2538f6de-6fd0-4b5d-82da-6923c867bdbd" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the <legref jurisd="QLD" type="act" check="unknown">Plumbing and Drainage Act</legref>, part 4 or 5; or</txt></block></li></list></block></li><li id="sch.1-sec.1-ssec.2-para1.h" guid="_70a4b495-3b6e-4164-a542-4c0681dd3039" status="uncommenced" provision.type="other"><no>(h)</no><block status="uncommenced"><txt break.before="1">a decision to give an enforcement notice in relation to a matter under paragraphs (a) to (g); or</txt></block></li><li id="sch.1-sec.1-ssec.2-para1.i" guid="_dc79fade-841f-421a-af65-fb172e9f043f" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a decision to give an infrastructure charges notice; or</txt></block></li><li id="sch.1-sec.1-ssec.2-para1.j" guid="_9bb607c1-b017-469d-9120-7a7a1c7394f8" status="uncommenced" provision.type="other"><no>(j)</no><block status="uncommenced"><txt break.before="1">the refusal, or deemed refusal, of a conversion application; or</txt></block></li><li id="sch.1-sec.1-ssec.2-para1.k" guid="_5caf476d-3310-4cac-9a69-86b5766530db" status="uncommenced" provision.type="other"><no>(k)</no><block status="uncommenced"><txt break.before="1">a matter that, under another Act, may be appealed to the tribunal; or</txt></block></li><li id="sch.1-sec.1-ssec.2-para1.l" guid="_20c67aa1-9b5f-418c-8f2f-26516d944b72" status="uncommenced" provision.type="other"><no>(l)</no><block status="uncommenced"><txt break.before="1">a matter prescribed by regulation.</txt></block></li></list></block></subclause><subclause id="sch.1-sec.1-ssec.3" guid="_232da8b4-f1a5-478f-bad2-cfb08026536c" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block status="uncommenced"><txt break.before="1">Also, table 1 does not apply to a tribunal if the matter involves—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.1-sec.1-ssec.3-para1.a" guid="_2e66aee7-5fce-4bfa-95ec-b0fbc1e9175b" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for a matter in subsection (2)(a) to (d)—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.1-sec.1-ssec.3-para1.a-para2.i" guid="_ffd43a85-c17f-45ee-93ec-4c7bd2c3d751" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a development approval for which the development application required impact assessment; and</txt></block></li><li id="sch.1-sec.1-ssec.3-para1.a-para2.ii" guid="_268c21f8-5e87-4b57-bfd9-0f487372264c" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">a development approval in relation to which the assessment manager received a properly made submission for the development application; or</txt></block></li></list></block></li><li id="sch.1-sec.1-ssec.3-para1.b" guid="_a6302af2-0014-4954-98c5-1ffafbd93091" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a provision of a development approval about the identification or inclusion, under a variation approval, of a matter for the development.</txt></block></li></list></block></subclause><subclause id="sch.1-sec.1-ssec.4" guid="_539c3940-c9cf-48ea-9479-c4135d314513" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block status="uncommenced"><txt break.before="1">Table 2 states the matters that may be appealed only to the P&#38;E Court.</txt></block></subclause><subclause id="sch.1-sec.1-ssec.5" guid="_d5c3a194-1b2a-4ab0-ba4a-6316389e23c5" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block status="uncommenced"><txt break.before="1">Table 3 states the matters that may be appealed only to the tribunal.</txt></block></subclause><subclause id="sch.1-sec.1-ssec.6" guid="_42c23dd4-3812-45a4-8d58-99585ec892a9" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block status="uncommenced"><txt break.before="1">In each table—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.1-sec.1-ssec.6-para1.a" guid="_8bbeb192-3500-46fd-9470-cf8d88f3ee04" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">column 1 states the appellant in the appeal; and</txt></block></li><li id="sch.1-sec.1-ssec.6-para1.b" guid="_9b91c897-2717-4d83-bb36-4dd896a1a286" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">column 2 states the respondent in the appeal; and</txt></block></li><li id="sch.1-sec.1-ssec.6-para1.c" guid="_7586673b-cf86-4b8d-b760-e9670f4b00ed" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">column 3 states the co-respondent (if any) in the appeal; and</txt></block></li><li id="sch.1-sec.1-ssec.6-para1.d" guid="_094a8192-93e0-46f7-bb28-acf59a819d5d" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">column 4 states the co-respondents by election (if any) in the appeal.</txt></block></li></list></block></subclause><subclause id="sch.1-sec.1-ssec.7" guid="_c17eb74b-04e7-48e4-8049-5c4d901b8cc7" status="uncommenced" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block status="uncommenced"><txt break.before="1">If the chief executive receives a notice of appeal under section 230(3)(f), the chief executive may elect to be a co-respondent in the appeal.</txt><table frame="all" colsep="1" rowsep="0" orient="port" id="sch.1-sec.1-ssec.7-tbl" guid="_4a7c7cb8-2fff-400c-bb62-e1cd82ab50f4" heading.align="left" font.size="10.pt"><tgroup cols="4" colsep="1" rowsep="0" align="left" tgroupstyle="Unruled3column"><colspec colnum="1" colname="1" colwidth="1.250in"/><colspec colnum="2" colname="2" colwidth="1.250in"/><colspec colnum="3" colname="3" colwidth="1.250in"/><colspec colnum="4" colname="4" colwidth="1.250in"/><thead><row rowsep="0" id="sch.1-sec.1-ssec.7-tbl-tblh-tblr" guid="_2cb00d27-3bb5-4fd8-af2f-e1b0b9bc9860"><entry namest="1" nameend="4" align="center" id="sch.1-sec.1-ssec.7-tbl-tblh-tblr-tble1" guid="_010509c5-bb4f-47fb-8eec-2b7cb6adb829"><txt break.before="1">Table 1</txt><txt break.before="1">Appeals to the P&#38;E Court and, for certain matters, to a tribunal</txt></entry></row></thead><tbody><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-tblr" guid="_4f1c652a-a84b-48f6-abcb-ef218c7c3a8c"><entry namest="1" nameend="4" id="sch.1-sec.1-ssec.7-tbl-tblr-tble1" guid="_9dab4139-e663-4391-a0ea-77d7f6611f0b"><block status="uncommenced"><txt break.before="1">1. Development applications</txt><txt break.before="1">An appeal may be made against—</txt><tlist number.type="default"><tli id="sch.1-sec.1-ssec.7-tbl-tblr-tble1-para1.a" guid="_73f11a37-13c4-4523-8803-2539989016a8"><no>(a)</no><block status="uncommenced"><txt break.before="1">the refusal of all or part of the development application; or</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-tblr-tble1-para1.b" guid="_1656f57b-de42-4052-8a75-639a1765a861"><no>(b)</no><block status="uncommenced"><txt break.before="1">the deemed refusal of the development application; or</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-tblr-tble1-para1.c" guid="_1d92adc8-0443-4dca-9176-63ee940d9fd7"><no>(c)</no><block status="uncommenced"><txt break.before="1">a provision of the development approval; or</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-tblr-tble1-para1.d" guid="_bcea3e50-6e63-4c3a-83ee-19d90562a6ee"><no>(d)</no><block status="uncommenced"><txt break.before="1">if a development permit was applied for—the decision to give a preliminary approval.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.2" guid="_e6d06c3c-4730-4c2d-bef4-a10e45897388"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.2-tble1" guid="_9e49a747-b969-4c72-b3c8-f99f7324f126"><block status="uncommenced"><txt break.before="1">Column 1</txt><txt break.before="1">Appellant</txt></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.2-tble2" guid="_45f13563-1a36-405f-8ab9-bc09c8660a09"><block status="uncommenced"><txt break.before="1">Column 2</txt><txt break.before="1">Respondent</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.2-tble3" guid="_3bdfb5df-7976-448f-80e5-680f2678295e"><block status="uncommenced"><txt break.before="1">Column 3</txt><txt break.before="1">Co-respondent(if any)</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.2-tble4" guid="_45c9bb4f-8cba-4465-96ea-56663c437987"><block status="uncommenced"><txt break.before="1">Column 4</txt><txt break.before="1">Co-respondentby election (ifany)</txt></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.3" guid="_351cb53d-3f0f-4778-8526-59f29c212b76"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.3-tble1" guid="_9746a2ed-0a35-43b0-b135-3f625f25e588"><block align="left" status="uncommenced"><txt break.before="1">The applicant</txt></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.3-tble2" guid="_44768041-34e8-42c8-bd47-669148a9d456"><block align="left" status="uncommenced"><txt break.before="1">The assessment manager</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.3-tble3" guid="_9ef8150c-cd30-4c2a-8c1c-94ce297811b3"><block align="left" status="uncommenced"><txt break.before="1">If the appeal is about a concurrence agency’s referral response—the concurrence agency</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.3-tble4" guid="_11c44d3a-2241-4214-a714-0a67d726b48b"><block status="uncommenced"><tlist number.type="default"><tli id="sch.1-sec.1-ssec.7-tbl-tblr-oc.3-tble4-para1.1" guid="_2acb4d88-6d97-4416-97d8-7ca4eb4a2388"><no>1</no><block status="uncommenced"><txt break.before="1">A concurrence agency that is not a co-respondent</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-tblr-oc.3-tble4-para1.2" guid="_a37e4e5c-022e-44cb-afcb-b1e31a372533"><no>2</no><block status="uncommenced"><txt break.before="1">If a chosen assessment manager is the respondent—the prescribed assessment manager</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-tblr-oc.3-tble4-para1.3" guid="_247ee55c-00a0-4ea9-bd3b-851227795ef0"><no>3</no><block status="uncommenced"><txt break.before="1">Any eligible advice agency for the application</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-tblr-oc.3-tble4-para1.4" guid="_b49d9a3e-97bb-4d4d-be7a-9ff01022cfbd"><no>4</no><block status="uncommenced"><txt break.before="1">Any eligible submitter for the application</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.4" guid="_cc524f68-0317-4654-bf81-e2da272b1b91"><entry namest="1" nameend="4" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.4-tble1" guid="_905630c4-3690-43a8-9edc-1ee0c38c4c6f"><block status="uncommenced"><txt break.before="1">2. Change applications</txt><txt break.before="1">An appeal may be made against—</txt><tlist number.type="default"><tli id="sch.1-sec.1-ssec.7-tbl-tblr-oc.4-tble1-para1.a" guid="_0afd9172-78df-4661-8f17-6d734dcf94d1"><no>(a)</no><block status="uncommenced"><txt break.before="1">a responsible entity’s decision for a change application, other than a decision made by the P&#38;E court; or</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-tblr-oc.4-tble1-para1.b" guid="_5e2f913f-e67a-40c8-baf4-2e2796b97bf9"><no>(b)</no><block status="uncommenced"><txt break.before="1">a deemed refusal of a change application.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.5" guid="_e6bf75d9-5151-4842-86dd-6c48adcf6796"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.5-tble1" guid="_ae916fd9-fa52-4520-84c2-af3bb890d6fc"><block status="uncommenced"><txt break.before="1">Column 1</txt><txt break.before="1">Appellant</txt></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.5-tble2" guid="_b82f1d9c-4c0e-4232-9768-6a18de8ac394"><block status="uncommenced"><txt break.before="1">Column 2</txt><txt break.before="1">Respondent</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.5-tble3" guid="_27d81ac0-6c8a-49e1-92fa-dcdec2e427e9"><block status="uncommenced"><txt break.before="1">Column 3</txt><txt break.before="1">Co-respondent(if any)</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.5-tble4" guid="_4fefd24c-acfa-4f7c-9f6a-38fdbbaed588"><block status="uncommenced"><txt break.before="1">Column 4</txt><txt break.before="1">Co-respondentby election (ifany)</txt></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.6" guid="_e34955e3-5967-4cf4-8c19-c89e404aaa69"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.6-tble1" guid="_6e738b0d-c038-4dc1-a1a6-a7f8e246d011"><block status="uncommenced"><tlist number.type="default"><tli id="sch.1-sec.1-ssec.7-tbl-tblr-oc.6-tble1-para1.1" guid="_deaeb38a-538c-46e5-a032-f2b0941df464"><no>1</no><block status="uncommenced"><txt break.before="1">The applicant</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-tblr-oc.6-tble1-para1.2" guid="_64980677-9731-43a7-a53d-e51225aad309"><no>2</no><block status="uncommenced"><txt break.before="1">If the responsible entity is the assessment manager—an affected entity that gave a pre-request notice or response notice</txt></block></tli></tlist></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.6-tble2" guid="_509bbcaf-b9b9-471b-98da-eae8d9560bac"><block align="left" status="uncommenced"><txt break.before="1">The responsible entity</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.6-tble3" guid="_c1389044-e1ec-492d-b142-40cb249d23a2"><block align="left" status="uncommenced"><txt break.before="1">If an affected entity starts the appeal—the applicant</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.6-tble4" guid="_57e25190-0264-436d-bbca-834f644a0b27"><block status="uncommenced"><tlist number.type="default"><tli id="sch.1-sec.1-ssec.7-tbl-tblr-oc.6-tble4-para1.1" guid="_234aabb1-88ce-4326-994f-1e2cb35089ae"><no>1</no><block status="uncommenced"><txt break.before="1">A concurrence agency for the development application</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-tblr-oc.6-tble4-para1.2" guid="_8f1fd71d-f7b5-42d5-8316-93f90581eb0b"><no>2</no><block status="uncommenced"><txt break.before="1">If a chosen assessment manager is the respondent—the prescribed assessment manager</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-tblr-oc.6-tble4-para1.3" guid="_1ec987e5-0690-4337-ada2-c5e1b3abe51f"><no>3</no><block status="uncommenced"><txt break.before="1">A private certifier for the development application</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-tblr-oc.6-tble4-para1.4" guid="_14e2906b-0cfd-4aa1-93ed-8bb64ef2f45b"><no>4</no><block status="uncommenced"><txt break.before="1">Any eligible advice agency for the change application</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-tblr-oc.6-tble4-para1.5" guid="_a99ba9b6-a512-43d0-8238-307cbdee8101"><no>5</no><block status="uncommenced"><txt break.before="1">Any eligible submitter for the change application</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.7" guid="_ad2fc12b-d83a-47eb-b137-13c2bdb9197e"><entry namest="1" nameend="4" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.7-tble1" guid="_1a0aed05-c150-4572-9961-f17eb94c7a2e"><block status="uncommenced"><txt break.before="1">3. Extension applications</txt><txt break.before="1">An appeal may be made against—</txt><tlist number.type="default"><tli id="sch.1-sec.1-ssec.7-tbl-tblr-oc.7-tble1-para1.a" guid="_8af4cc0b-c940-4149-9b7e-e4b9646fd4ae"><no>(a)</no><block status="uncommenced"><txt break.before="1">the assessment manager’s decision about an extension application; or</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-tblr-oc.7-tble1-para1.b" guid="_4cbb5852-3627-44ba-ad59-ca8d873f48b6"><no>(b)</no><block status="uncommenced"><txt break.before="1">a deemed refusal of an extension application.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.8" guid="_6976cbb5-27d1-475e-9b86-0e639d888bfb"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.8-tble1" guid="_2bb6901a-5873-4f43-91f3-ea853ef1e168"><block status="uncommenced"><txt break.before="1">Column 1</txt><txt break.before="1">Appellant</txt></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.8-tble2" guid="_ef62c481-54bf-4caa-9a57-91c069937643"><block status="uncommenced"><txt break.before="1">Column 2</txt><txt break.before="1">Respondent</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.8-tble3" guid="_fc75a8ea-7be5-4d43-92b3-5a1a9f6edc07"><block status="uncommenced"><txt break.before="1">Column 3</txt><txt break.before="1">Co-respondent(if any)</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.8-tble4" guid="_0700832e-92a4-440c-9742-2124b42fa552"><block status="uncommenced"><txt break.before="1">Column 4</txt><txt break.before="1">Co-respondentby election (ifany)</txt></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.9" guid="_a17ec255-ac71-497f-980e-f0fa78dc60c5"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.9-tble1" guid="_e89e8745-0ed0-4aae-8df2-0a4c8651b3aa"><block status="uncommenced"><tlist number.type="default"><tli id="sch.1-sec.1-ssec.7-tbl-tblr-oc.9-tble1-para1.1" guid="_9ac54e0f-9f10-4a4c-b176-9f3fecf2506b"><no>1</no><block status="uncommenced"><txt break.before="1">The applicant</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-tblr-oc.9-tble1-para1.2" guid="_e94b4068-04f5-4c79-860b-9b8ea359768d"><no>2</no><block status="uncommenced"><txt break.before="1">For a matter other than a deemed refusal of an extension application—a concurrence agency, other than the chief executive, for the application</txt></block></tli></tlist></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.9-tble2" guid="_9f5dd411-9868-4472-b4ba-b48d7bc9db6a"><block align="left" status="uncommenced"><txt break.before="1">The assessment manager</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.9-tble3" guid="_a2f787b9-29d4-4c9a-8391-36996d92a475"><block align="left" status="uncommenced"><txt break.before="1">If a concurrence agency starts the appeal—the applicant</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.9-tble4" guid="_18577ba4-2c39-4c5d-99a1-564800e6b0b6"><block status="uncommenced"><txt break.before="1">If a chosen assessment manager is the respondent—the prescribed assessment manager</txt></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.10" guid="_0a45509d-9f13-43e8-8e9b-698a1cdcb3b3"><entry namest="1" nameend="4" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.10-tble1" guid="_0260c0b6-c4b7-41a0-bce1-db819cbf3293"><block status="uncommenced"><txt break.before="1">4. Infrastructure charges notices</txt><txt break.before="1">An appeal may be made against an infrastructure charges notice on 1 or more of the following grounds—</txt><tlist number.type="default"><tli id="sch.1-sec.1-ssec.7-tbl-tblr-oc.10-tble1-para1.a" guid="_24648b68-ecf8-47cd-b8fa-ad4f9a43fc7a"><no>(a)</no><block status="uncommenced"><txt break.before="1">the notice involved an error relating to—</txt><tlist number.type="default"><tli id="sch.1-sec.1-ssec.7-tbl-tblr-oc.10-tble1-para1.a-para2.i" guid="_d0cb7909-0dee-4a47-8966-ce84bacb2d20"><no>(i)</no><block status="uncommenced"><txt break.before="1">the application of the relevant adopted charge; or</txt><tnote id="sch.1-sec.1-ssec.7-tbl-tblr-oc.10-tble1-para1.a-para2.i-note" guid="_e275d0ed-9e58-4957-81da-9a32c55925d2"><heading id="sch.1-sec.1-ssec.7-tbl-tblr-oc.10-tble1-para1.a-para2.i-note-he" guid="_7dcb2d4b-9ce4-4748-81c3-8a09a5710184">Examples of errors in applying an adopted charge—</heading><block status="uncommenced"><tlist number.type="default"><tli id="sch.1-sec.1-ssec.7-tbl-tblr-oc.10-tble1-para1.a-para2.i-note-para3" guid="_28ad96b5-7d3c-4768-a432-34f3f7f28d61"><no>•</no><block status="uncommenced"><txt break.before="1">the incorrect application of gross floor area for a non-residential development</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-tblr-oc.10-tble1-para1.a-para2.i-note-para3-oc.2" guid="_3788addf-3f9e-4994-ac4f-a54c39e7899e"><no>•</no><block status="uncommenced"><txt break.before="1">applying an incorrect ‘use category’, under a regulation, to the development</txt></block></tli></tlist></block></tnote></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-tblr-oc.10-tble1-para1.a-para2.ii" guid="_8f09a18d-9bb9-45e3-a98f-9c6239713a53"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the working out of extra demand, for section 120; or</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-tblr-oc.10-tble1-para1.a-para2.iii" guid="_f4a6ddb7-bfb0-472f-831c-86003af3d9c0"><no>(iii)</no><block status="uncommenced"><txt break.before="1">an offset or refund; or</txt></block></tli></tlist></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-tblr-oc.10-tble1-para1.b" guid="_9f19c025-ca66-4a1b-a288-f327e55ee69a"><no>(b)</no><block status="uncommenced"><txt break.before="1">there was no decision about an offset or refund; or</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-tblr-oc.10-tble1-para1.c" guid="_36a798b0-5830-4106-8935-370d25b8166d"><no>(c)</no><block status="uncommenced"><txt break.before="1">if the infrastructure charges notice states a refund will be given—the timing for giving the refund; or</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-tblr-oc.10-tble1-para1.d" guid="_9cf2e74b-d221-45bd-b348-7aff2ab2fe5d"><no>(d)</no><block status="uncommenced"><txt break.before="1">the amount of the charge is so unreasonable that no reasonable relevant local government could have imposed the amount.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.11" guid="_96cd6ae4-9c36-4cdc-920d-819bf6acef1f"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.11-tble1" guid="_35000aea-17f7-4131-a262-be330f62acfb"><block status="uncommenced"><txt break.before="1">Column 1</txt><txt break.before="1">Appellant</txt></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.11-tble2" guid="_b8cd1ada-2381-4de9-9b03-d0a1970e4e43"><block status="uncommenced"><txt break.before="1">Column 2</txt><txt break.before="1">Respondent</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.11-tble3" guid="_902410be-5428-43d2-8f1c-8291237d65f1"><block status="uncommenced"><txt break.before="1">Column 3</txt><txt break.before="1">Co-respondent(if any)</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.11-tble4" guid="_abc6739b-c3a6-4e78-b9dd-3e505d79c2db"><block status="uncommenced"><txt break.before="1">Column 4</txt><txt break.before="1">Co-respondentby election (ifany)</txt></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.12" guid="_4c70b230-b2f1-4c36-8c4f-0299ff9bece0"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.12-tble1" guid="_7ae5f52e-4a35-4136-b235-6d3b8e0b64b2"><block status="uncommenced"><txt break.before="1">The person given the infrastructure charges notice</txt></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.12-tble2" guid="_7a93d8a5-fe31-4744-b9d6-1969a28f10e6"><block align="left" status="uncommenced"><txt break.before="1">The local government that gave the infrastructure charges notice</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.12-tble3" guid="_d070ce0e-a335-480a-9c73-a903a41e4324"><block align="left" status="uncommenced"><txt break.before="1">—</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.12-tble4" guid="_cc0cc099-82ae-4d2b-87a3-c2b8ec55dff9"><block status="uncommenced"><txt break.before="1">—</txt></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.13" guid="_26a4e72a-4117-485a-b3f3-b358ef58ad10"><entry namest="1" nameend="4" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.13-tble1" guid="_93d9b924-077d-41a7-9d03-9b25de803603"><block status="uncommenced"><txt break.before="1">5. Conversion applications</txt><txt break.before="1">An appeal may be made against—</txt><tlist number.type="default"><tli id="sch.1-sec.1-ssec.7-tbl-tblr-oc.13-tble1-para1.a" guid="_26c9bb77-977d-4b3b-a6b6-38fcd7a408e9"><no>(a)</no><block status="uncommenced"><txt break.before="1">the refusal of a conversion application; or</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-tblr-oc.13-tble1-para1.b" guid="_7fdb0f91-df6c-478a-87df-c1cf8f394477"><no>(b)</no><block status="uncommenced"><txt break.before="1">a deemed refusal of a conversion application.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.14" guid="_c791f8da-8f6a-46bf-9957-5737096fbfe5"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.14-tble1" guid="_6899c5f7-742e-4589-8c79-e0d59e9bb3f6"><block status="uncommenced"><txt break.before="1">Column 1</txt><txt break.before="1">Appellant</txt></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.14-tble2" guid="_29b22e5a-9f7f-4cb8-8bf5-55f940715a49"><block status="uncommenced"><txt break.before="1">Column 2</txt><txt break.before="1">Respondent</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.14-tble3" guid="_61f42e27-1f4b-4bff-9128-32070605c6a9"><block status="uncommenced"><txt break.before="1">Column 3</txt><txt break.before="1">Co-respondent(if any)</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.14-tble4" guid="_e8211562-1cbe-46df-8182-bd2fa16f78f3"><block status="uncommenced"><txt break.before="1">Column 4</txt><txt break.before="1">Co-respondentby election (ifany)</txt></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.15" guid="_7714a42a-7f2b-40ca-a354-99641b1037ed"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.15-tble1" guid="_9336610a-d1f6-4837-bf3e-9861dfd61220"><block status="uncommenced"><txt break.before="1">The applicant</txt></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.15-tble2" guid="_4f51d743-28f4-4644-99d6-2e0f3f046edd"><block align="left" status="uncommenced"><txt break.before="1">The local government to which the conversion application was made</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.15-tble3" guid="_60eb374d-9add-4510-8e45-e1f7d3af6ed5"><block align="left" status="uncommenced"><txt break.before="1">—</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.15-tble4" guid="_bacfd300-2e6b-4646-98ec-14adad3b2fc1"><block status="uncommenced"><txt break.before="1">—</txt></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.16" guid="_9506e3f0-946a-431a-b5ac-5ffd387574c8"><entry namest="1" nameend="4" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.16-tble1" guid="_c034319b-1b7b-42d7-bee2-7d57fa07d5ec"><block status="uncommenced"><txt break.before="1">6. Enforcement notices</txt><txt break.before="1">An appeal may be made against the decision to give an enforcement notice.</txt></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.17" guid="_4fd703aa-00aa-465f-93ef-a28f6c634017"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.17-tble1" guid="_d285f0c7-cc21-439b-a8df-4ed2edbfe4ef"><block status="uncommenced"><txt break.before="1">Column 1</txt><txt break.before="1">Appellant</txt></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.17-tble2" guid="_f9f9e1c1-8337-467d-8e51-8a1b2e7bdd53"><block status="uncommenced"><txt break.before="1">Column 2</txt><txt break.before="1">Respondent</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.17-tble3" guid="_39be8d04-97bf-43a5-9b99-b26243a9a4f9"><block status="uncommenced"><txt break.before="1">Column 3</txt><txt break.before="1">Co-respondent(if any)</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.17-tble4" guid="_3f3a7969-5b9c-426d-96d9-f522976c7a68"><block status="uncommenced"><txt break.before="1">Column 4</txt><txt break.before="1">Co-respondentby election (ifany)</txt></block></entry></row><row rowsep="0" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.18" guid="_4b29fa74-d2b9-4f8b-be94-e1adb0344b1a"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.18-tble1" guid="_bece1d52-d09f-48bb-856d-9261c8153edb"><block status="uncommenced"><txt break.before="1">The person given the enforcement notice</txt></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.18-tble2" guid="_e32258d8-3494-43a1-b9ab-4a94d1b5938c"><block align="left" status="uncommenced"><txt break.before="1">The enforcement authority</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.18-tble3" guid="_af29ecbb-370d-487f-a9ee-3c105b47c87d"><block align="left" status="uncommenced"><txt break.before="1">—</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-tblr-oc.18-tble4" guid="_e22f7b2b-683e-4d83-8ead-9f8bdbf352af"><block status="uncommenced"><txt break.before="1">If the enforcement authority is not the local government for the premises in relation to which the offence is alleged to have happened—the local government</txt></block></entry></row></tbody></tgroup></table><table frame="all" colsep="1" rowsep="0" orient="port" id="sch.1-sec.1-ssec.7-tbl-oc.2" guid="_ae2597b5-9b71-49f6-bf47-7dcda8cf05f2" heading.align="left" font.size="10.pt"><tgroup cols="4" colsep="1" rowsep="0" align="left" tgroupstyle="Unruled3column"><colspec colnum="1" colname="1" colwidth="1.250in"/><colspec colnum="2" colname="2" colwidth="1.250in"/><colspec colnum="3" colname="3" colwidth="1.250in"/><colspec colnum="4" colname="4" colwidth="1.250in"/><thead><row rowsep="0" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblh-tblr" guid="_3e78f749-ee55-4b7e-887f-f93887356ccc"><entry namest="1" nameend="4" align="center" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblh-tblr-tble1" guid="_22161248-180f-4fa6-b2b1-9b26ed9d8100"><txt break.before="1">Table 2</txt><txt break.before="1">Appeals to the P&#38;E Court only</txt></entry></row></thead><tbody><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr" guid="_d0eaad9f-f5db-4af9-894c-df2f64cce27c"><entry namest="1" nameend="4" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-tble1" guid="_54d128da-06ae-4c9d-99c1-1cb64efd6488"><block status="uncommenced"><txt break.before="1">1. Appeals from tribunal</txt><txt break.before="1">An appeal may be made against a decision of a tribunal, other than a decision under section 252, on the ground of—</txt><tlist number.type="default"><tli id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-tble1-para1.a" guid="_fcaa8814-2938-4644-8bcc-9012d3cec8fe"><no>(a)</no><block status="uncommenced"><txt break.before="1">an error or mistake in law on the part of the tribunal; or</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-tble1-para1.b" guid="_3d1f1c3c-da2f-4094-b5e0-9f903e966dd3"><no>(b)</no><block status="uncommenced"><txt break.before="1">jurisdictional error.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.2" guid="_de6d43b3-989e-4f84-ab57-aaabfffb6444"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.2-tble1" guid="_1dc174ad-e2dc-439b-b38f-a04707e73601"><block status="uncommenced"><txt break.before="1">Column 1</txt><txt break.before="1">Appellant</txt></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.2-tble2" guid="_abb696dc-431b-433b-b828-ac2087113b25"><block status="uncommenced"><txt break.before="1">Column 2</txt><txt break.before="1">Respondent</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.2-tble3" guid="_2cd5f715-4798-40d1-a587-8676f98eefd4"><block status="uncommenced"><txt break.before="1">Column 3</txt><txt break.before="1">Co-respondent(if any)</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.2-tble4" guid="_ec9ca011-936b-4f74-80dd-01ccaaa46fcf"><block status="uncommenced"><txt break.before="1">Column 4</txt><txt break.before="1">Co-respondentby election (ifany)</txt></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.3" guid="_d6564222-368f-40f7-a2ff-c4b96228ec70"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.3-tble1" guid="_a923bb36-a1eb-4c8e-a75d-d8bea21a0ac6"><block align="left" status="uncommenced"><txt break.before="1">A party to the proceedings for the decision</txt></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.3-tble2" guid="_defb209d-2db4-4b49-94d5-1aea84806171"><block align="left" status="uncommenced"><txt break.before="1">The other party to the proceedings for the decision</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.3-tble3" guid="_081fee9f-ec6e-49a2-8d26-3fc078cce655"><block align="left" status="uncommenced"><txt break.before="1">—</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.3-tble4" guid="_1610eb78-4e3a-4a1e-8223-47088b186f0b"><block status="uncommenced"><txt break.before="1">—</txt></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.4" guid="_97a97e96-3a12-4661-98fb-4f824ee7db37"><entry namest="1" nameend="4" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.4-tble1" guid="_88664484-7403-4de6-9a2d-b5434a38bfb7"><block status="uncommenced"><txt break.before="1">2. Eligible submitter appeals</txt><txt break.before="1">An appeal may be made against the decision to give a development approval, or an approval for a change application, to the extent that the decision relates to—</txt><tlist number.type="default"><tli id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.4-tble1-para1.a" guid="_fabb9288-f6a7-4c2f-a136-efe45878424e"><no>(a)</no><block status="uncommenced"><txt break.before="1">any part of the development application for the development approval that required impact assessment; or</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.4-tble1-para1.b" guid="_925ae90f-15f2-4697-b2f1-6cee79369a2b"><no>(b)</no><block status="uncommenced"><txt break.before="1">a variation request.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.5" guid="_a673bdf4-633f-41d2-93bc-1e8a5bc896d9"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.5-tble1" guid="_8c36ff0a-11ac-43d5-b24e-7f0378553c55"><block status="uncommenced"><txt break.before="1">Column 1</txt><txt break.before="1">Appellant</txt></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.5-tble2" guid="_503fbbc5-7987-49f8-a2e4-5970b1ab9c04"><block status="uncommenced"><txt break.before="1">Column 2</txt><txt break.before="1">Respondent</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.5-tble3" guid="_38281a44-0afa-46a7-bd7c-9ed35b37a4e1"><block status="uncommenced"><txt break.before="1">Column 3</txt><txt break.before="1">Co-respondent(if any)</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.5-tble4" guid="_da71eff0-9779-4f8a-a6e2-a316822c1de6"><block status="uncommenced"><txt break.before="1">Column 4</txt><txt break.before="1">Co-respondentby election (ifany)</txt></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.6" guid="_d6e55d9f-329c-44ee-b2b2-6d3280ca9e93"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.6-tble1" guid="_dad80657-b804-4966-bc28-fcaf5ea7f675"><block status="uncommenced"><tlist number.type="default"><tli id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.6-tble1-para1.1" guid="_76230d1a-615c-483c-b773-798bc03e6c10"><no>1</no><block status="uncommenced"><txt break.before="1">For a development application—an eligible submitter for the development application</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.6-tble1-para1.2" guid="_ee5fae4a-b66c-4406-b857-f54e16c63800"><no>2</no><block status="uncommenced"><txt break.before="1">For a change application—an eligible submitter for the change application</txt></block></tli></tlist></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.6-tble2" guid="_db74ec68-8e89-4c9f-8582-a64e83720b72"><block status="uncommenced"><tlist number.type="default"><tli id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.6-tble2-para1.1" guid="_d00239aa-62f1-4979-b3ea-2e8b02074eca"><no>1</no><block status="uncommenced"><txt break.before="1">For a development application—the assessment manager</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.6-tble2-para1.2" guid="_6cfbafc4-c41c-4ff7-8fe9-e3807103015d"><no>2</no><block status="uncommenced"><txt break.before="1">For a change application—the responsible entity</txt></block></tli></tlist></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.6-tble3" guid="_5b020900-026a-438f-a355-4bf5c96eb964"><block align="left" status="uncommenced"><tlist number.type="default"><tli id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.6-tble3-para1.1" guid="_5dc40167-83e7-4b8b-81fa-27dc88f990f2"><no>1</no><block status="uncommenced"><txt break.before="1">The applicant</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.6-tble3-para1.2" guid="_93107690-2b4d-4b96-84d3-61b03b77f07b"><no>2</no><block status="uncommenced"><txt break.before="1">If the appeal is about a concurrence agency’s referral response—the concurrence agency</txt></block></tli></tlist></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.6-tble4" guid="_04b4fda3-1ffe-47f9-b051-89e75b73bc21"><block status="uncommenced"><txt break.before="1">Another eligible submitter for the application</txt></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.7" guid="_5b7c8218-eed4-4c4a-9003-55bffbbc87c8"><entry namest="1" nameend="4" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.7-tble1" guid="_d0e634b9-05c0-4733-a7b3-518c782171d1"><block status="uncommenced"><txt break.before="1">3. Eligible submitter and eligible advice agency appeals</txt><txt break.before="1">An appeal may be made against a provision of a development approval, or failure to include a provision in the development approval, to the extent the matter relates to—</txt><tlist number.type="default"><tli id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.7-tble1-para1.a" guid="_47e432d5-8dbd-4674-97b4-d795c1bea804"><no>(a)</no><block status="uncommenced"><txt break.before="1">any part of the development application or the change application, for the development approval, that required impact assessment; or</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.7-tble1-para1.b" guid="_2c1befda-e73e-4ff8-9390-37378800215f"><no>(b)</no><block status="uncommenced"><txt break.before="1">a variation request.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.8" guid="_aabd1220-7cc1-46b7-b373-03481a96df6a"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.8-tble1" guid="_50588ad7-f18f-493f-aaad-8be30791a616"><block status="uncommenced"><txt break.before="1">Column 1</txt><txt break.before="1">Appellant</txt></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.8-tble2" guid="_5b957278-8017-4df9-a263-412791a489ad"><block status="uncommenced"><txt break.before="1">Column 2</txt><txt break.before="1">Respondent</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.8-tble3" guid="_052818d9-841e-4302-86e8-5a7d8b2ad866"><block status="uncommenced"><txt break.before="1">Column 3</txt><txt break.before="1">Co-respondent(if any)</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.8-tble4" guid="_5d7d4b92-2cab-43ec-af65-212366f80e03"><block status="uncommenced"><txt break.before="1">Column 4</txt><txt break.before="1">Co-respondentby election (ifany)</txt></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.9" guid="_9db50049-4b3b-4540-a25f-10c28990869a"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.9-tble1" guid="_82bb8562-3350-413f-9bc3-2953a0d0241d"><block status="uncommenced"><tlist number.type="default"><tli id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.9-tble1-para1.1" guid="_b1c9dad8-15ca-44b3-ac0f-fe682a77b576"><no>1</no><block status="uncommenced"><txt break.before="1">For a development application—an eligible submitter for the development application</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.9-tble1-para1.2" guid="_ec90ab8c-0cd0-4ac7-b173-be30267a5054"><no>2</no><block status="uncommenced"><txt break.before="1">For a change application—an eligible submitter for the change application</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.9-tble1-para1.3" guid="_3109f150-6857-4fd4-b99c-f810953f71b8"><no>3</no><block status="uncommenced"><txt break.before="1">An eligible advice agency for the development application or change application</txt></block></tli></tlist></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.9-tble2" guid="_53772cd1-85a6-4e88-a4c2-0f09cfb8c0e5"><block align="left" status="uncommenced"><tlist number.type="default"><tli id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.9-tble2-para1.1" guid="_eb4f7e54-01b0-4e54-bdc1-1f3d12eb8717"><no>1</no><block status="uncommenced"><txt break.before="1">For a development application—the assessment manager</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.9-tble2-para1.2" guid="_00685fad-d3ef-4e4a-84a0-4e3ad3b954be"><no>2</no><block status="uncommenced"><txt break.before="1">For a change application—the responsible entity</txt></block></tli></tlist></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.9-tble3" guid="_48c07461-44dd-49e5-ba0e-d606d368ac9a"><block align="left" status="uncommenced"><tlist number.type="default"><tli id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.9-tble3-para1.1" guid="_dc8f019e-6e19-4de2-8e70-d7aafdcfe30f"><no>1</no><block status="uncommenced"><txt break.before="1">The applicant</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.9-tble3-para1.2" guid="_54f9010b-84a6-483f-9ac8-3659f4ac0661"><no>2</no><block status="uncommenced"><txt break.before="1">If the appeal is about a concurrence agency’s referral response—the concurrence agency</txt></block></tli></tlist></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.9-tble4" guid="_b2740dcc-47e7-4595-927d-22fae1434c0d"><block status="uncommenced"><txt break.before="1">Another eligible submitter for the application</txt></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.10" guid="_b878513d-ec6d-46ce-8a63-7e8773154964"><entry namest="1" nameend="4" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.10-tble1" guid="_b4dbe368-b79c-4185-a5e5-2e872e76b54d"><block status="uncommenced"><txt break.before="1">4. Compensation claims</txt><txt break.before="1">An appeal may be made against—</txt><tlist number.type="default"><tli id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.10-tble1-para1.a" guid="_1eeb0337-4085-4fc6-b847-6f8c2501dcd0"><no>(a)</no><block status="uncommenced"><txt break.before="1">a decision under section 32 about a compensation claim; or</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.10-tble1-para1.b" guid="_df3ae140-46b6-4697-809d-46683f3ae878"><no>(b)</no><block status="uncommenced"><txt break.before="1">a decision under section 265 about a claim for compensation; or</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.10-tble1-para1.c" guid="_1cc689d5-ea75-4773-88f7-e281133c8ba8"><no>(c)</no><block status="uncommenced"><txt break.before="1">a deemed refusal of a claim under paragraph (a) or (b).</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.11" guid="_1fce321a-52c2-4153-98f8-166c1d2829b8"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.11-tble1" guid="_99def2db-f5a3-4b27-ab9c-37cf4b77c020"><block status="uncommenced"><txt break.before="1">Column 1</txt><txt break.before="1">Appellant</txt></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.11-tble2" guid="_a576969c-7bf3-4fc7-b15a-b48ca052f603"><block status="uncommenced"><txt break.before="1">Column 2</txt><txt break.before="1">Respondent</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.11-tble3" guid="_22456d5d-b182-4d8f-97c3-aa44bc787da6"><block status="uncommenced"><txt break.before="1">Column 3</txt><txt break.before="1">Co-respondent(if any)</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.11-tble4" guid="_8ea5ad06-7c8c-4be1-869a-dc2ead08a95e"><block status="uncommenced"><txt break.before="1">Column 4</txt><txt break.before="1">Co-respondentby election (ifany)</txt></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.12" guid="_27df9c4d-87b4-46c9-9b0c-3d03bb181301"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.12-tble1" guid="_ac3b2966-562d-4783-a9e9-7a2819bcbdd6"><block status="uncommenced"><txt break.before="1">A person dissatisfied with the decision</txt></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.12-tble2" guid="_aa78da2a-7392-403f-9a12-536a5dfc6dc1"><block align="left" status="uncommenced"><txt break.before="1">The local government to which the claim was made</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.12-tble3" guid="_96fbf0dc-d0fb-47c8-908a-4d44102cbbb9"><block align="left" status="uncommenced"><txt break.before="1">—</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.12-tble4" guid="_ab6e301e-29ee-4e49-9c94-b1c008c0d019"><block status="uncommenced"><txt break.before="1">—</txt></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.13" guid="_561b4253-4d6d-449e-926d-c4bd2065a092"><entry namest="1" nameend="4" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.13-tble1" guid="_243cafe7-d427-4dac-b277-3c30470d820a"><block status="uncommenced"><txt break.before="1">5. Registered premises</txt><txt break.before="1">An appeal may be made against a decision of the Minister under chapter 7, part 4.</txt></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.14" guid="_ac3cb91c-bcd8-4c04-951d-9063c76eca0c"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.14-tble1" guid="_03cb6f20-0bb3-42f4-8efe-395a49747290"><block status="uncommenced"><txt break.before="1">Column 1</txt><txt break.before="1">Appellant</txt></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.14-tble2" guid="_1ebd2094-44c2-4f8f-aaa7-b54d52dbec3d"><block status="uncommenced"><txt break.before="1">Column 2</txt><txt break.before="1">Respondent</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.14-tble3" guid="_057fe780-5a01-4e56-a0d0-58ad9fa03ae3"><block status="uncommenced"><txt break.before="1">Column 3</txt><txt break.before="1">Co-respondent(if any)</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.14-tble4" guid="_d912a2d7-2401-439d-99f3-0f2b8bb5c98b"><block status="uncommenced"><txt break.before="1">Column 4</txt><txt break.before="1">Co-respondentby election (ifany)</txt></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.15" guid="_24f1979c-1fb8-4f1f-bfc5-8be29dc64855"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.15-tble1" guid="_f2a0cc07-cc36-4dfb-b4ba-dbce15354fac"><block status="uncommenced"><tlist number.type="default"><tli id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.15-tble1-para1.1" guid="_7049c3cd-8d8b-4206-af93-2769ebc8741c"><no>1</no><block status="uncommenced"><txt break.before="1">A person given a decision notice about the decision</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.15-tble1-para1.2" guid="_9b01951f-0b8a-408f-9ffc-3b454f0885e5"><no>2</no><block status="uncommenced"><txt break.before="1">If the decision is to register premises or renew the registration of premises—an owner or occupier of premises in the affected area for the registered premises who is dissatisfied with the decision</txt></block></tli></tlist></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.15-tble2" guid="_1b3cda5d-edc0-4da8-887b-a6bcaa92d677"><block align="left" status="uncommenced"><txt break.before="1">The Minister</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.15-tble3" guid="_aaa9c56a-7233-4d6a-8b5e-fce84dc00250"><block align="left" status="uncommenced"><txt break.before="1">—</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.15-tble4" guid="_84007911-a90b-4f40-b3fa-2831b1772f45"><block status="uncommenced"><txt break.before="1">If an owner or occupier starts the appeal—the owner of the registered premises</txt></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.16" guid="_61d85acd-d38a-46c3-b7c6-6e08c23fff0b"><entry namest="1" nameend="4" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.16-tble1" guid="_3e362373-8c7e-47d4-83a3-49b9dc5ee17b"><block status="uncommenced"><txt break.before="1">6. Local laws</txt><txt break.before="1">An appeal may be made against a decision of a local government, or conditions applied, under a local law about—</txt><tlist number.type="default"><tli id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.16-tble1-para1.a" guid="_d4b9200e-87f0-4b94-85e8-06998c52a5c5"><no>(a)</no><block status="uncommenced"><txt break.before="1">the use of premises, other than a use that is the natural and ordinary consequence of prohibited development; or</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.16-tble1-para1.b" guid="_aabaebe9-3454-465d-92b6-0b7e992ea728"><no>(b)</no><block status="uncommenced"><txt break.before="1">the erection of a building or other structure.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.17" guid="_3ffa5fba-6e92-40f4-9b58-364dc5a92e64"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.17-tble1" guid="_8848d35e-2e13-4159-8952-6086328dc85f"><block status="uncommenced"><txt break.before="1">Column 1</txt><txt break.before="1">Appellant</txt></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.17-tble2" guid="_8a17bf53-eb52-4161-a7d7-fb42bcd5e88a"><block status="uncommenced"><txt break.before="1">Column 2</txt><txt break.before="1">Respondent</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.17-tble3" guid="_8a422c49-49aa-4624-9627-100efdce1fb5"><block status="uncommenced"><txt break.before="1">Column 3</txt><txt break.before="1">Co-respondent(if any)</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.17-tble4" guid="_f9da0b8f-e184-42e9-b17f-249996f08542"><block status="uncommenced"><txt break.before="1">Column 4</txt><txt break.before="1">Co-respondentby election (ifany)</txt></block></entry></row><row rowsep="0" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.18" guid="_d7f64fba-f50c-4cd0-9ccc-1b5e73688c2e"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.18-tble1" guid="_aabe2e26-4cb6-4da1-bcdb-1dd3667ff2cc"><block status="uncommenced"><txt break.before="1">A person who—</txt><tlist number.type="default"><tli id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.18-tble1-para1.a" guid="_e28cacfb-795e-4948-9a22-8f2a5c410c83"><no>(a)</no><block status="uncommenced"><txt break.before="1">applied for the decision; and</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.18-tble1-para1.b" guid="_0f916e4a-bb6b-4742-a654-d60184fac8aa"><no>(b)</no><block status="uncommenced"><txt break.before="1">is dissatisfied with the decision or conditions.</txt></block></tli></tlist></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.18-tble2" guid="_4a313dc4-cca3-4458-8151-76d3e3e9dfcf"><block align="left" status="uncommenced"><txt break.before="1">The local government</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.18-tble3" guid="_36d62f26-de5b-4932-88d0-cfd6e8f50878"><block align="left" status="uncommenced"><txt break.before="1">—</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-oc.2-tblr-oc.18-tble4" guid="_74c150c5-8ff5-41a9-86c6-0ad9ebae0ac9"><block status="uncommenced"><txt break.before="1">—</txt></block></entry></row></tbody></tgroup></table><table frame="all" colsep="1" rowsep="0" orient="port" id="sch.1-sec.1-ssec.7-tbl-oc.3" guid="_23d37c7c-5984-43da-b03e-8253322c95ad" heading.align="left" font.size="10.pt"><tgroup cols="4" colsep="1" rowsep="0" align="left" tgroupstyle="Unruled3column"><colspec colnum="1" colname="1" colwidth="1.250in"/><colspec colnum="2" colname="2" colwidth="1.250in"/><colspec colnum="3" colname="3" colwidth="1.250in"/><colspec colnum="4" colname="4" colwidth="1.250in"/><thead><row rowsep="0" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblh-tblr" guid="_b2c3b803-cc62-4fd6-9d2a-6899f691714e"><entry namest="1" nameend="4" align="center" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblh-tblr-tble1" guid="_ec83ee97-bcdb-499e-97e0-deb0dd7ee927"><txt break.before="1">Table 3</txt><txt break.before="1">Appeals to a tribunal only</txt></entry></row></thead><tbody><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr" guid="_5619a2a6-a5ca-4a0a-b201-aec4e205f314"><entry namest="1" nameend="4" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-tble1" guid="_51f0cef3-8f74-431e-9a19-e2d51c1e89c9"><block status="uncommenced"><txt break.before="1">1. Building advisory agency appeals</txt><txt break.before="1">An appeal may be made against giving a development approval for building work to the extent the building work required code assessment against the building assessment provisions.</txt></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.2" guid="_8db0946d-31f6-4914-900d-aba82e59fa9b"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.2-tble1" guid="_4132df41-5354-42de-9b3b-d141ebc36e07"><block status="uncommenced"><txt break.before="1">Column 1</txt><txt break.before="1">Appellant</txt></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.2-tble2" guid="_8ec0ae74-84f0-43e8-ad15-5cc550b686a9"><block status="uncommenced"><txt break.before="1">Column 2</txt><txt break.before="1">Respondent</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.2-tble3" guid="_25668a0d-b2e6-4e19-8a2d-ebffda49748e"><block status="uncommenced"><txt break.before="1">Column 3</txt><txt break.before="1">Co-respondent(if any)</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.2-tble4" guid="_fafdff66-58a8-4e0f-a571-0fe3ecc8896f"><block status="uncommenced"><txt break.before="1">Column 4</txt><txt break.before="1">Co-respondentby election (ifany)</txt></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.3" guid="_e1819e9f-b5ee-4939-a7cf-b9343959ee01"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.3-tble1" guid="_6e5bc3f6-8618-49dd-8b6b-cc1d3ca76789"><block align="left" status="uncommenced"><txt break.before="1">A building advisory agency for the development application related to the approval</txt></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.3-tble2" guid="_bf0fb838-64dc-42f5-882d-ee5fd1e8f4f1"><block align="left" status="uncommenced"><txt break.before="1">The assessment manager</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.3-tble3" guid="_5b97a6c7-a2cb-48c5-a94b-b177ffe8d70f"><block align="left" status="uncommenced"><txt break.before="1">The applicant</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.3-tble4" guid="_248849e0-4c0c-4a97-adc2-0afdf69f225f"><block status="uncommenced"><tlist number.type="default"><tli id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.3-tble4-para1.1" guid="_53c148c3-c0e1-4273-822c-642fc76b0e30"><no>1</no><block status="uncommenced"><txt break.before="1">A concurrence agency for the development application related to the approval</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.3-tble4-para1.2" guid="_463784df-91c2-4660-87b6-01c73c1928ac"><no>2</no><block status="uncommenced"><txt break.before="1">A private certifier for the development application related to the approval</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.4" guid="_351e409e-5640-44cc-bf9a-43b27f848aff"><entry namest="1" nameend="4" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.4-tble1" guid="_7963efc5-6339-4c92-bc7a-ed9422fc4902"><block status="uncommenced"><txt break.before="1">2. Inspection of building work</txt><txt break.before="1">An appeal may be made against a decision of a building certifier or referral agency about the inspection of building work that is the subject of a building development approval under the Building Act.</txt></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.5" guid="_35a27f95-f053-4e25-ba93-10331ca6a6ca"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.5-tble1" guid="_ea5e3bcb-ff99-4b00-85f3-ca794164a190"><block status="uncommenced"><txt break.before="1">Column 1</txt><txt break.before="1">Appellant</txt></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.5-tble2" guid="_47919ae5-9a13-4eda-b5c4-6d5cc8bb0324"><block status="uncommenced"><txt break.before="1">Column 2</txt><txt break.before="1">Respondent</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.5-tble3" guid="_bcad56d0-8223-45c7-ae51-03d371c73fcc"><block status="uncommenced"><txt break.before="1">Column 3</txt><txt break.before="1">Co-respondent(if any)</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.5-tble4" guid="_2d634e2a-49ed-4f04-9c4a-a62b4b2c34a2"><block status="uncommenced"><txt break.before="1">Column 4</txt><txt break.before="1">Co-respondentby election (ifany)</txt></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.6" guid="_2c257eb9-cb1f-46fd-92cc-389b24ebc832"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.6-tble1" guid="_68b0e07f-ac7d-4ddc-a392-f83e3ac17256"><block status="uncommenced"><txt break.before="1">The applicant for the development approval</txt></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.6-tble2" guid="_fd138b2a-9c73-49e8-b547-7d2ad51f6b33"><block status="uncommenced"><txt break.before="1">The person who made the decision</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.6-tble3" guid="_4e6535c3-ca44-4f2d-814f-35b927a65af3"><block align="left" status="uncommenced"><txt break.before="1">—</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.6-tble4" guid="_8b83ee15-71d3-4bcb-8058-baaf44576f1d"><block status="uncommenced"><txt break.before="1">—</txt></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.7" guid="_8f536995-ee06-4b61-9ff9-28bf474c41d5"><entry namest="1" nameend="4" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.7-tble1" guid="_0ea6d043-7e2d-45f1-80b4-2431a244415f"><block status="uncommenced"><txt break.before="1">3. Certain decisions under the Building Act and the Plumbing and DrainageAct</txt><txt break.before="1">An appeal may be made against a decision under—</txt><tlist number.type="default"><tli id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.7-tble1-para1.a" guid="_b508958f-0b6f-4371-b36a-99a53ba50f4e"><no>(a)</no><block status="uncommenced"><txt break.before="1">the <legref jurisd="QLD" type="act" check="unknown">Building Act</legref>, other than a decision made by the Queensland Building and Construction Commission; or</txt></block></tli><tli id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.7-tble1-para1.b" guid="_5aa50074-be50-4a8b-8509-818aa51a34f9"><no>(b)</no><block status="uncommenced"><txt break.before="1">the <legref jurisd="QLD" type="act" check="unknown">Plumbing and Drainage Act</legref>, part 4 or 5.</txt></block></tli></tlist></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.8" guid="_d334fe5d-08f2-4de1-aa44-bdfa18d489ef"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.8-tble1" guid="_5edc079e-5473-409a-8b80-5f1988b919ed"><block status="uncommenced"><txt break.before="1">Column 1</txt><txt break.before="1">Appellant</txt></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.8-tble2" guid="_3174380b-b5a9-4f13-beac-d3a9af65b046"><block status="uncommenced"><txt break.before="1">Column 2</txt><txt break.before="1">Respondent</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.8-tble3" guid="_ca93b5e3-62a2-4ec9-9386-8bd08456feaa"><block status="uncommenced"><txt break.before="1">Column 3</txt><txt break.before="1">Co-respondent(if any)</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.8-tble4" guid="_8cd59c8f-36b1-40e1-a297-24559f74c165"><block status="uncommenced"><txt break.before="1">Column 4</txt><txt break.before="1">Co-respondentby election (ifany)</txt></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.9" guid="_9d0f64b7-36df-4d5d-80fb-01aee307d80a"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.9-tble1" guid="_10c64613-c726-4c74-b04f-33ed0d6016b1"><block status="uncommenced"><txt break.before="1">A person who received, or was entitled to receive, notice of the decision</txt></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.9-tble2" guid="_4331a9cf-4fab-4242-b83f-223c09e8eb71"><block align="left" status="uncommenced"><txt break.before="1">The person who made the decision</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.9-tble3" guid="_6d098763-c288-4ba0-bd64-d53be9f37bca"><block align="left" status="uncommenced"><txt break.before="1">—</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.9-tble4" guid="_00e0b249-38dc-4266-9ef2-53d3424073ac"><block status="uncommenced"><txt break.before="1">—</txt></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.10" guid="_e0a61fa5-e238-4cc7-8be7-0dbc35905bd5"><entry namest="1" nameend="4" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.10-tble1" guid="_1b74ab16-f7b6-40d4-866a-7ebe0b92850f"><block status="uncommenced"><txt break.before="1">4. Local government failure to decide application under the Building Act</txt><txt break.before="1">An appeal may be made against a local government’s failure to decide an application under the <legref jurisd="QLD" type="act" check="unknown">Building Act</legref> within the period required under that Act.</txt></block></entry></row><row rowsep="1" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.11" guid="_b17b6648-22a9-40b0-a172-56041dfc7178"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.11-tble1" guid="_33977bc4-5407-456c-8108-8f7012d35cf0"><block status="uncommenced"><txt break.before="1">Column 1</txt><txt break.before="1">Appellant</txt></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.11-tble2" guid="_2a06218b-fa0b-4560-a7a9-be32690fb252"><block status="uncommenced"><txt break.before="1">Column 2</txt><txt break.before="1">Respondent</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.11-tble3" guid="_d8b7bdf0-7b61-43d4-9bce-0355ead15478"><block status="uncommenced"><txt break.before="1">Column 3</txt><txt break.before="1">Co-respondent(if any)</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.11-tble4" guid="_78cba7f4-08e9-4808-81a8-2420df927b3b"><block status="uncommenced"><txt break.before="1">Column 4</txt><txt break.before="1">Co-respondentby election (ifany)</txt></block></entry></row><row rowsep="0" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.12" guid="_b19d331c-1d73-4b58-b35b-3f82709c9350"><entry colname="1" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.12-tble1" guid="_3a101c92-78b6-429e-a792-ab8126b995eb"><block status="uncommenced"><txt break.before="1">A person who was entitled to receive notice of the decision</txt></block></entry><entry colname="2" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.12-tble2" guid="_8086f432-2959-41dd-9793-a2abcb950732"><block align="left" status="uncommenced"><txt break.before="1">The local government to which the application was made</txt></block></entry><entry colname="3" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.12-tble3" guid="_d55eca0f-41df-46d5-aa39-65fb8a1e04b8"><block align="left" status="uncommenced"><txt break.before="1">—</txt></block></entry><entry colname="4" id="sch.1-sec.1-ssec.7-tbl-oc.3-tblr-oc.12-tble4" guid="_c3182fb1-660a-48d2-8cc6-5118df46d1d1"><block status="uncommenced"><txt break.before="1">—</txt></block></entry></row></tbody></tgroup></table></block></subclause></clause></schedule><schedule id="sch.2" guid="_005df229-7be0-4f6d-862b-4b3a6d9548c9" type="schedule" status="uncommenced" affected.by.uncommenced="0" spent.amends="0" numbering.style="manual" provision.type="other"><no>Schedule 2</no><heading id="sch.2-he" guid="_144c926e-894b-45fb-8e89-3adb12a07f77">Dictionary</heading><sourceref id="sch.2-ref" guid="_f280c0d3-caec-47d7-b2bf-d2a83f1661ba" status="uncommenced" affected.by.uncommenced="0">section 6</sourceref><block status="uncommenced"><deflist><definition id="sch.2-def.accepteddevelopment_" guid="_dae5ea64-438b-4a44-bf46-d05700231a13" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.accepteddevelopment" guid="_a04e5db9-1137-4c2c-808b-4e09ffdd993e" type="definition">accepted development</defterm> see section 44(4).</txt></definition><definition id="sch.2-def.AcquisitionAct_" guid="_0ec985c0-79f3-475b-9e8a-4340764d5cd8" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.AcquisitionAct" guid="_587ce1b2-a92a-4d5f-8787-920e430f7807" type="definition">Acquisition Act</defterm> means the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Acquisition of Land Act 1967</name></legref>.</txt></definition><definition id="sch.2-def.acquisitionland_" guid="_efa9d415-dfbd-4e43-ac21-62f5579d9cb6" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.acquisitionland" guid="_4cd125b5-8342-4085-864d-b95a8bba1e24" type="definition">acquisition land</defterm> means land, or an interest in land—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.acquisitionland-para1.a" guid="_c16b4beb-dc3d-492b-b654-f892f4597c0d" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">proposed to be taken or acquired under the Acquisition Act or the State Development Act; and</txt></block></li><li id="sch.2-def.acquisitionland-para1.b" guid="_ac86ee64-68b7-408f-bd81-39b9ca805f6d" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for which a notice of intention to resume under the Acquisition Act has been served, and the proposed taking or acquisition has not been discontinued; and</txt></block></li><li id="sch.2-def.acquisitionland-para1.c" guid="_d5e7bc82-1bc6-4969-b7c1-40aa99c0f375" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">that has not been taken or acquired.</txt></block></li></list></definition><definition id="sch.2-def.adoptedcharge_" guid="_d2396146-208b-446e-aa60-5635e090f7d0" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.adoptedcharge" guid="_12d579c1-b89c-4f2d-969a-7a5ecb84b0c7" type="definition">adopted charge</defterm> see section 113(1).</txt></definition><definition id="sch.2-def.adverseplanningchange_" guid="_9a561add-f1c6-45b4-bfbc-b6de5ad1e326" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.adverseplanningchange" guid="_7a3bb476-51fc-4e3c-aa9b-400d381d2b87" type="definition">adverse planning change</defterm> see section 30(2) to (4).</txt></definition><definition id="sch.2-def.adviceagency_" guid="_a3a59ce8-1c3d-4446-a72b-14fe2a67b612" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.adviceagency" guid="_374ec4d1-177b-4094-9ef5-cd0683ba727f" type="definition">advice agency</defterm> means a referral agency that only has power to give advice.</txt></definition><definition id="sch.2-def.affectedarea_" guid="_46823c0a-478a-4faa-a9ac-1cd772a215fe" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.affectedarea" guid="_77e03d29-6b80-4400-a533-c6b78262fffa" type="definition">affected area</defterm> see section 266(b).</txt></definition><definition id="sch.2-def.affectedareadevelopmentapplication_" guid="_2b2626d1-37f5-44b7-bb48-f5bb460e6d77" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.affectedareadevelopmentapplication" guid="_55cb8767-3e83-4b40-90e2-c981f96af63b" type="definition">affected area development application</defterm> is a development application for a material change of use of premises or reconfiguring a lot in an affected area, other than an application prescribed by regulation.</txt></definition><definition id="sch.2-def.affectedentity_" guid="_38dd6f5c-6645-4921-ad52-b771c6127de2" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.affectedentity" guid="_6e488392-adfa-41a1-b8a9-ef5c6d0ca59c" type="definition">affected entity</defterm> see section 80(2).</txt></definition><definition id="sch.2-def.affectedlocalgovernment_" guid="_7e848d44-04aa-4f6b-8b33-01df7be582b7" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.affectedlocalgovernment" guid="_c0a3e630-5962-442b-bbf7-f57852321f8e" type="definition">affected local government</defterm> means a local government with a local government area that the Minister considers is, or will be, affected by a State planning instrument.</txt></definition><definition id="sch.2-def.affectedowner_" guid="_2cedc6cf-0a86-4a7a-9282-a3495fca23f8" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.affectedowner" guid="_2649e248-90da-4435-9288-fdb251324324" type="definition">affected owner</defterm> see section 31(1).</txt></definition><definition id="sch.2-def.affectedparties_" guid="_7ab4194f-e75b-45c3-b15f-4bfd7c51f5c9" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.affectedparties" guid="_04a33ab8-4718-4db3-b49f-a7b2cc642da4" type="definition">affected parties</defterm>, in relation to a designation, means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.affectedparties-para1.a" guid="_4d0a4033-c333-4449-a1da-f9a11890b39a" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">each owner of premises to which the designation applies or will apply; and</txt></block></li><li id="sch.2-def.affectedparties-para1.b" guid="_dda6aa6a-a649-4086-98bb-92692c5d443c" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the designator is the Minister—each local government with a local government area that the Minister considers is, or will be, affected by the designation.</txt></block></li></list></definition><definition id="sch.2-def.agreement_" guid="_85730787-b601-496b-aa94-3e070ddabd08" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.agreement" guid="_fcfbca18-d54e-4916-ab28-b6172667988f" type="definition">agreement</defterm> means a written agreement.</txt></definition><definition id="sch.2-def.appealperiod_" guid="_e6134532-9804-430d-a2a2-e58dbedec118" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.appealperiod" guid="_92ece5be-db48-4a7b-96f6-46a08227b427" type="definition">appeal period</defterm> see section 229(3).</txt></definition><definition id="sch.2-def.appealrights_" guid="_0474450b-c336-471e-a132-2c80f207de29" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.appealrights" guid="_5abd1b23-ebed-4682-b86d-1b699abc978c" type="definition">appeal rights</defterm> means the appeal rights under chapter 6, part 1 and schedule 1.</txt></definition><definition id="sch.2-def.appellant_" guid="_c09b2b35-ed68-49f8-9825-d94e64b724a7" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.appellant" guid="_27876b32-531e-4a43-8de2-46739fdc1244" type="definition">appellant</defterm> see section 229(1).</txt></definition><definition id="sch.2-def.applicant_" guid="_6f797411-60df-43cd-b630-7102c6b65505" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.applicant" guid="_6b1cbcfb-303f-4154-83f1-a9a50de90ff1" type="definition">applicant</defterm>, for an appeal in relation to an application, includes the person in whom the benefit of the application vests.</txt><note id="sch.2-def.applicant-note" guid="_a6437559-0011-46ed-9cb4-b03a742d4351" type="example"><heading id="sch.2-def.applicant-note-he" guid="_1b70c9c3-caba-4a8e-a6dd-8e26c372695c">Note—</heading><block status="uncommenced"><txt break.before="1">For the meanings of <defterm guid="_220489ba-5904-4324-8333-05ec7dc98c59" type="mention">applicant</defterm> used in particular contexts, see section 280.</txt></block></note></definition><definition id="sch.2-def.application_" guid="_18c4182b-aa36-4b03-bb55-c3ddecb54c15" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.application" guid="_8c0e5192-a989-433c-803d-9bea2693ec95" type="definition">application</defterm>, for chapter 3, part 6, see section 90(1).</txt></definition><definition id="sch.2-def.approvedform_" guid="_be2389ed-3f74-4c16-89e9-a526c8da547a" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.approvedform" guid="_5d2db7da-c092-455b-870c-f1b2c250eb97" type="definition">approved form</defterm> means a form that—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.approvedform-para1.a" guid="_ea23efbd-4e5b-45f4-85b9-43a5b9fc5e09" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for a form for use in the P&#38;E Court—is an approved form under the P&#38;E Court Act; or</txt></block></li><li id="sch.2-def.approvedform-para1.b" guid="_bfb46f7a-163e-4058-bc1b-6f17a16dc2bf" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">otherwise—the chief executive approves under section 282.</txt></block></li></list></definition><definition id="sch.2-def.assessabledevelopment_" guid="_b753ed45-614d-400c-b1b2-6064987768d9" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.assessabledevelopment" guid="_9dec58d7-88bf-4e94-a935-1dc309219a26" type="definition">assessable development</defterm> see section 44(3).</txt></definition><definition id="sch.2-def.assessmentbenchmarks_" guid="_5dfe68be-e2e6-43c3-a9a2-687c1ce3c17c" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.assessmentbenchmarks" guid="_fcd87573-1320-495c-8477-36b14b86e587" type="definition">assessment benchmarks</defterm> see section 43(1)(c).</txt></definition><definition id="sch.2-def.assessmentmanager_" guid="_7146dd70-0aa9-472f-a030-1401706b7038" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.assessmentmanager" guid="_a1e5bdb9-7284-4699-9be2-31c0af38e923" type="definition">assessment manager</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.assessmentmanager-para1.a" guid="_5070390e-33f6-4f6d-b970-ecdfefdc3290" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">has the meaning given in section 48; and</txt></block></li><li id="sch.2-def.assessmentmanager-para1.b" guid="_852693a8-9213-4e6b-b697-eb8f2aab0b60" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">includes a prescribed assessment manager and a chosen assessment manager.</txt></block></li></list></definition><definition id="sch.2-def.automaticincreaseprovision_" guid="_0025d5c6-27d4-4b5e-9379-6de70fb79648" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.automaticincreaseprovision" guid="_af328a40-45f1-40ed-abf4-cd04fc2b9293" type="definition">automatic increase provision</defterm> see section 114(3)(b).</txt></definition><definition id="sch.2-def.breakupagreement_" guid="_6c86d798-d418-498c-bb45-79a43cf1dabf" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.breakupagreement" guid="_7ee3f38c-94b2-4f5e-8f57-1f0354177d1f" type="definition">breakup agreement</defterm> see section 115(2).</txt></definition><definition id="sch.2-def.building_" guid="_1d1c1e7c-75c5-48cc-a93c-d14831edea2e" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.building" guid="_27d8b54f-7490-4bce-b921-be929284be38" type="definition">building</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.building-para1.a" guid="_983be39f-38f8-4bc5-aa66-462d3d5cfec8" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a fixed structure that is wholly or partly enclosed by walls and is roofed; or</txt></block></li><li id="sch.2-def.building-para1.b" guid="_ca57c400-fbe1-4c28-82c7-bb1e45de5cda" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a floating building; or</txt></block></li><li id="sch.2-def.building-para1.c" guid="_a6bc4116-1851-456a-a27a-9a3eb612a871" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">any part of a building.</txt></block></li></list></definition><definition id="sch.2-def.BuildingAct_" guid="_8506d8f0-6c97-4d01-84a5-5923bdbe35c1" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.BuildingAct" guid="_7627d4fd-4619-43a4-afd8-800e6b730ca4" type="definition">Building Act</defterm> means the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Building Act 1975</name></legref>.</txt></definition><definition id="sch.2-def.buildingadvisoryagency_" guid="_34a5b859-192d-4112-83ae-dba00292c5ce" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.buildingadvisoryagency" guid="_7e237358-d0a8-44dd-8b51-83180111fe03" type="definition">building advisory agency</defterm>, for a development application, means an advice agency for the application whose functions relate to the assessment of building work against the building assessment provisions.</txt></definition><definition id="sch.2-def.buildingassessmentprovisions_" guid="_de6b635e-24c4-463d-b0ae-b2db2710e0d2" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.buildingassessmentprovisions" guid="_18aa3669-956e-40f1-bda8-1ba2f4bff42e" type="definition">building assessment provisions</defterm> see the Building Act, section 30.</txt></definition><definition id="sch.2-def.buildingcertifier_" guid="_514f6937-b908-4f24-b7a2-723d22182d4c" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.buildingcertifier" guid="_c7a95562-5ca8-4599-8159-fb7257c2b2fa" type="definition">building certifier</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.buildingcertifier-para1.a" guid="_20354ce9-89e7-4285-b18a-a17b83ceaac0" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">an individual who, under the Building Act, is licensed as a building certifier; and</txt></block></li><li id="sch.2-def.buildingcertifier-para1.b" guid="_a4d7cb51-461f-4ef2-8e73-5b6f939ca9d4" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a private certifier.</txt></block></li></list></definition><definition id="sch.2-def.BuildingCode_" guid="_303362c5-22f6-4d29-bad4-16d724b763b7" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.BuildingCode" guid="_3ea98c9d-c79e-4a08-bf06-2429b251ae6b" type="definition">Building Code</defterm> means the parts of the National Construction Code that form the Building Code of Australia (including the Queensland Appendix), published by the Australian Building Codes Board, as amended from time to time by amendments published by the board.</txt></definition><definition id="sch.2-def.buildingwork_" guid="_bf836cbc-fefe-492d-a3a4-45936f04a193" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.buildingwork" guid="_d1b7ac64-0ba9-4132-8514-72d1e4cb6314" type="definition">building work</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.buildingwork-para1.a" guid="_0814dd1f-9151-4bb3-a4d2-658f966fd1c3" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.buildingwork-para1.a-para2.i" guid="_06c82e79-d138-454c-8c29-06a2825c7951" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">building, repairing, altering, underpinning (whether by vertical or lateral support), moving or demolishing a building or other structure; or</txt><note id="sch.2-def.buildingwork-para1.a-para2.i-note" guid="_e528d0d7-a6ca-42cd-8965-f50e275451fc" type="example"><heading id="sch.2-def.buildingwork-para1.a-para2.i-note-he" guid="_8e73e540-3cef-4d19-84f8-72f7e11743fc">Example—</heading><block status="uncommenced"><txt break.before="1">building a retaining wall</txt></block></note></block></li><li id="sch.2-def.buildingwork-para1.a-para2.ii" guid="_bc4ca97a-5f55-4dd3-b7fb-45fd2129368e" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">works regulated under the building assessment provisions; or</txt></block></li><li id="sch.2-def.buildingwork-para1.a-para2.iii" guid="_d30480ce-d54c-401e-a154-2f2725766522" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">excavating or filling for, or incidental to, the activities stated in subparagraph (i); or</txt></block></li><li id="sch.2-def.buildingwork-para1.a-para2.iv" guid="_9334f90d-6c4d-4832-b2bf-56c0aff794ad" status="uncommenced" provision.type="other"><no>(iv)</no><block status="uncommenced"><txt break.before="1">excavating or filling that may adversely affect the stability of a building or other structure, whether on the premises on which the building or other structure is situated or on adjacent premises; or</txt></block></li><li id="sch.2-def.buildingwork-para1.a-para2.v" guid="_e5aa454e-1291-4635-b1e2-c52c574bd56c" status="uncommenced" provision.type="other"><no>(v)</no><block status="uncommenced"><txt break.before="1">supporting (vertically or laterally) premises for activities stated in subparagraph (i); and</txt></block></li></list></block></li><li id="sch.2-def.buildingwork-para1.b" guid="_94dcb6a9-51a2-449e-9cf2-113ac25eaf0d" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for a Queensland heritage place, includes—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.buildingwork-para1.b-para2.i" guid="_007c849c-9edb-410a-bb28-61c4880c33d7" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">altering, repairing, maintaining or moving a built, natural or landscape feature on the place; and</txt></block></li><li id="sch.2-def.buildingwork-para1.b-para2.ii" guid="_0a3cfc00-8d2b-4fb7-bb6f-1397ffbf2172" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">excavating, filling or other disturbances to premises that damage, expose or move archaeological artefacts, as defined under the Heritage Act, on the place; and</txt></block></li><li id="sch.2-def.buildingwork-para1.b-para2.iii" guid="_d1866bd2-d9d6-4d59-ab04-22db60df787c" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">altering, repairing or removing artefacts that contribute to the place’s cultural heritage significance (furniture or fittings, for example); and</txt></block></li><li id="sch.2-def.buildingwork-para1.b-para2.iv" guid="_15eeb01a-0cc2-4eec-9e12-41a7767f07ea" status="uncommenced" provision.type="other"><no>(iv)</no><block status="uncommenced"><txt break.before="1">altering, repairing or removing building finishes that contribute to the place’s cultural heritage significance (paint, wallpaper or plaster, for example); and</txt></block></li></list></block></li><li id="sch.2-def.buildingwork-para1.c" guid="_fdabb8b1-133e-4c2f-aa5f-35fc6035ffa8" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">does not include undertaking—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.buildingwork-para1.c-para2.i" guid="_3be0788c-fb4b-4ea6-9b63-575078ba36ac" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">operations of any type and all things constructed or installed that allow taking or interfering with water under the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Water Act 2000</name></legref>; or</txt></block></li><li id="sch.2-def.buildingwork-para1.c-para2.ii" guid="_5527c4ab-2dc4-4104-b17c-8b5a171d9cc3" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">tidal works; or</txt></block></li><li id="sch.2-def.buildingwork-para1.c-para2.iii" guid="_daed9e5e-85d9-4f4e-a206-8b5e77605f44" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">works for reconfiguring a lot; and</txt></block></li></list></block></li><li id="sch.2-def.buildingwork-para1.d" guid="_5280e81a-59a2-4d57-a1ac-59f5ddfc292c" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">for paragraph (a)(ii)—includes a management procedure or other activity relating to a building or structure even though the activity does not involve a structural change to the building or structure.</txt></block></li></list></definition><definition id="sch.2-def.businessday_" guid="_c56e91b2-60a8-4411-9a7a-bf466c2a61c5" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.businessday" guid="_d404a216-4cf7-4680-995e-675145b09761" type="definition">business day</defterm> does not include a day between 26 December of a year and 1 January of the next year.</txt></definition><definition id="sch.2-def.callin_" guid="_15343d80-bb52-45ff-ba3c-9a7afc50a1e1" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.callin" guid="_65a4689a-3516-4bc8-bbce-0f06f59095bc" type="definition">call in</defterm>, an application, means call the application in under chapter 3, part 6, division 3.</txt></definition><definition id="sch.2-def.callinnotice_" guid="_5863c8dc-b329-4175-9a7d-febb73d316fb" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.callinnotice" guid="_a9351cbe-ebd6-4b13-a2ee-242605f0a8ca" type="definition">call in notice</defterm> see section 103(1).</txt></definition><definition id="sch.2-def.canal_" guid="_e7dd531d-984c-42fc-b133-3d3ff429233a" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.canal" guid="_5c4c6959-1ee2-4232-bddf-3acb667223c0" type="definition">canal</defterm> see the <legref jurisd="QLD" type="act" check="unknown">Coastal Act</legref>, section 9.</txt></definition><definition id="sch.2-def.cancellationapplication_" guid="_2a60e2ac-4f12-4719-b1a4-082448f70e99" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.cancellationapplication" guid="_7ecbd5df-0f92-44ac-a068-408e086ddf5a" type="definition">cancellation application</defterm> see section 84(1).</txt></definition><definition id="sch.2-def.categorisinginstrument_" guid="_6c2070ca-916a-44e4-8053-a1607fabbb95" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.categorisinginstrument" guid="_24d3ed72-8048-4d88-99aa-210e9f4f8dff" type="definition">categorising instrument</defterm> see section 43(1).</txt></definition><definition id="sch.2-def.certificateofclassification_" guid="_f5ae1fd4-f474-4a5e-95ac-dd3a7e377e29" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.certificateofclassification" guid="_a9a07341-99a2-4646-9f6f-e0110299f610" type="definition">certificate of classification</defterm> see the <legref jurisd="QLD" type="act" check="unknown">Building Act</legref>.</txt></definition><definition id="sch.2-def.certifiedcopy_" guid="_5765b22d-0ca0-4238-b3c6-2593040aa111" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.certifiedcopy" guid="_c6d7fc40-3650-4e6f-96ad-f31cc67dcbf9" type="definition">certified copy</defterm>, of a document, means a copy of the document certified as being an unaltered copy of the document by—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.certifiedcopy-para1.a" guid="_7ce51d45-126d-4ae0-b83d-295b3fb167fb" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for a document required to be kept by the Minister—the chief executive of any department for which the Minister has responsibility; or</txt></block></li><li id="sch.2-def.certifiedcopy-para1.b" guid="_418d84e0-a1e4-4d08-9ae9-327588633af7" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for a document required to be kept by the chief executive—an appropriately qualified public service officer; or</txt></block></li><li id="sch.2-def.certifiedcopy-para1.c" guid="_a55d51ac-8795-414c-ad7c-4f0cb63fe044" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">for a document required to be kept by a local government—the local government’s chief executive officer; or</txt></block></li><li id="sch.2-def.certifiedcopy-para1.d" guid="_435dab39-b3d9-481d-bfda-0b83ed0aac04" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">for a document required to be kept by an individual—the individual; or</txt></block></li><li id="sch.2-def.certifiedcopy-para1.e" guid="_2a6aa12a-bbca-4726-b781-1a374c358579" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">for a document required to be kept by a department—the department’s chief executive; or</txt></block></li><li id="sch.2-def.certifiedcopy-para1.f" guid="_d6808993-cd41-4ddf-a12c-625590ae7534" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">for a document required to be kept by a body corporate—the body corporate’s chief executive officer.</txt></block></li></list></definition><definition id="sch.2-def.changeapplication_" guid="_0bdeb929-833f-4f55-a6af-076f156726b3" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.changeapplication" guid="_25717113-c3a0-43bb-8f1b-f95ce04688be" type="definition">change application</defterm> see section 78(1).</txt></definition><definition id="sch.2-def.changerepresentations_" guid="_85f708c0-fdb6-416b-bc62-3a756cf17bcb" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.changerepresentations" guid="_d2422165-f688-4450-8ccb-2caaefa82489" type="definition">change representations</defterm> see section 75(1).</txt></definition><definition id="sch.2-def.chargesbreakup_" guid="_2463e5b9-5253-4c63-9b78-4ccb055c44fe" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.chargesbreakup" guid="_7ab98609-87ec-4f1a-bbb9-ef6b7547f239" type="definition">charges breakup</defterm> means the proportion of the maximum adopted charges under chapter 4 and under the SEQ Water Act as between—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.chargesbreakup-para1.a" guid="_23d1905b-183b-41be-9381-f4238e5916d8" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the local government; and</txt></block></li><li id="sch.2-def.chargesbreakup-para1.b" guid="_20347edb-7358-4740-b1de-fcc1ee9894f8" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a distributor-retailer of the local government.</txt></block></li></list></definition><definition id="sch.2-def.chargesresolution_" guid="_32b07a18-d992-431b-ab4f-0c2fd3b7ab22" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.chargesresolution" guid="_e29365f1-3084-43be-94b0-97a17a0b78bd" type="definition">charges resolution</defterm> see section 113(1).</txt></definition><definition id="sch.2-def.chosenassessmentmanager_" guid="_4b477d0f-e619-448e-adc8-0d490d73c0ff" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.chosenassessmentmanager" guid="_c945d000-7f3f-4ea0-9a4f-cafa0463004e" type="definition">chosen assessment manager</defterm> means the assessment manager under section 48(3).</txt></definition><definition id="sch.2-def.CityofBrisbaneAct_" guid="_953ec708-ea2a-4001-a621-f5422b3f29f2" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.CityofBrisbaneAct" guid="_6b80d449-3967-498b-aa0c-6906d612ca36" type="definition">City of Brisbane Act</defterm> means the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">City of Brisbane Act 2010</name></legref>.</txt></definition><definition id="sch.2-def.classifiedbuilding_" guid="_f0ca8db5-4474-43db-a73c-941ebcb6ea9d" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.classifiedbuilding" guid="_509f428c-773c-4a53-99ca-43c12218bc17" type="definition">classified building</defterm> means a building classified under the Building Code as—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.classifiedbuilding-para1.a" guid="_2f75ba7a-0d06-4441-a281-d3553c5ae976" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a class 1 building; or</txt></block></li><li id="sch.2-def.classifiedbuilding-para1.b" guid="_a0c0f2d2-e5cf-464e-a8f1-d9eba1bf67ef" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a class 10 building, other than a building that is incidental or subordinate to the use, or proposed use, of a building classified under the Building Code as a class 2, 3, 4, 5, 6, 7, 8 or 9 building.</txt></block></li></list></definition><definition id="sch.2-def.clear_" guid="_c466ab02-9bfb-4f3c-8afa-90c8786bab34" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.clear" guid="_9c1dfcf6-ca36-400c-92e8-1d89468155a0" type="definition">clear</defterm>, in relation to vegetation, see the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Vegetation Management Act 1999</name></legref>.</txt></definition><definition id="sch.2-def.CoastalAct_" guid="_21e269c6-516c-44e0-a655-49903fc5acfd" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.CoastalAct" guid="_bf1dfe95-63d0-4fa6-8c0d-f165a110eb42" type="definition">Coastal Act</defterm> means the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Coastal Protection and Management Act 1995</name></legref>.</txt></definition><definition id="sch.2-def.codeassessment_" guid="_33664363-4c4d-4d0e-9b02-34c999797fa5" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.codeassessment" guid="_4f673720-2041-470d-b11e-9360a0d06587" type="definition">code assessment</defterm> see section 45(3).</txt></definition><definition id="sch.2-def.compensationclaim_" guid="_f954a1db-7d43-424e-a0e2-6c8375a45388" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.compensationclaim" guid="_4c037af8-f25e-4cda-b040-a5f32335ddf8" type="definition">compensation claim</defterm> means a claim for compensation under section 31(6).</txt></definition><definition id="sch.2-def.concurrenceagency_" guid="_d8c8e9ce-3b0e-4fed-9395-cd214a59265b" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.concurrenceagency" guid="_0fa8be33-8ba8-4595-a4ac-5ffeefb8d3e3" type="definition">concurrence agency</defterm> means a referral agency that is not an advice agency.</txt></definition><definition id="sch.2-def.consent_" guid="_5e908f6f-56ac-4767-b9a5-36f462e076c5" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.consent" guid="_d6a0ebf0-6647-4be0-b3c0-4e98ca4bdcfc" type="definition">consent</defterm> means written consent.</txt></definition><definition id="sch.2-def.conversionapplication_" guid="_33d933a1-006d-4dd5-a351-6b38e28f5659" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.conversionapplication" guid="_b327a141-04f5-4954-82f4-b94901de0046" type="definition">conversion application</defterm> see section 139(2).</txt></definition><definition id="sch.2-def.corespondentbyelection_" guid="_239f1610-183f-43ae-b0a2-3d47b3f55d14" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.corespondentbyelection" guid="_a5577ab7-b66f-4f65-a526-bec24a1b2c17" type="definition">co-respondent by election</defterm> means a person who may elect to be a co-respondent in an appeal.</txt></definition><definition id="sch.2-def.culturalheritagesignificance_" guid="_4f051d69-1ffb-4a54-93e0-5b3b1acd82a5" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.culturalheritagesignificance" guid="_e27476ef-7c93-4c1f-bda6-cf9a7ccd819b" type="definition">cultural heritage significance</defterm> see the <legref jurisd="QLD" type="act" check="unknown">Heritage Act</legref>, schedule.</txt></definition><definition id="sch.2-def.currencyperiod_" guid="_eb288d3f-b2ef-42bf-a154-d01e1de58f47" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.currencyperiod" guid="_6f7ce7a7-aa92-4940-9e7b-f728c30584d5" type="definition">currency period</defterm> see section 85(1).</txt></definition><definition id="sch.2-def.decisionmaker_" guid="_57dae4c1-aa70-4b3a-9bb4-e3ea548a13ce" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.decisionmaker" guid="_13e6960b-59ec-455e-91aa-61cea44a1225" type="definition">decision-maker</defterm> see section 90(2).</txt></definition><definition id="sch.2-def.decisionnotice_" guid="_78c5ae2b-3d86-4ce8-969d-90003b150c22" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.decisionnotice" guid="_e5946456-53cf-4adf-8e0b-827f0eb81f50" type="definition">decision notice</defterm>, about a decision, means a notice that states—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.decisionnotice-para1.a" guid="_b3e69005-b56d-4fb1-b05a-89c90f84dcbd" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the decision; and</txt></block></li><li id="sch.2-def.decisionnotice-para1.b" guid="_60114e32-6ed4-4b8e-85d3-9067ba0616b1" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the reasons for the decision if the decision is—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.decisionnotice-para1.b-para2.i" guid="_ead34d8b-b7ae-418b-98e3-e15dfd5ff7ee" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">to refuse an application or request wholly or partly; or</txt></block></li><li id="sch.2-def.decisionnotice-para1.b-para2.ii" guid="_191e1bbe-1875-4030-be89-3a7219edf306" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">a decision of a tribunal; or</txt></block></li><li id="sch.2-def.decisionnotice-para1.b-para2.iii" guid="_efb16018-99d4-4655-8f05-2516787d1e01" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">a decision of the chief executive under section 244(1) or (3); and</txt></block></li></list></block></li><li id="sch.2-def.decisionnotice-para1.c" guid="_53200bd0-5cf1-44ba-93d5-08f05fe4397c" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the day on which the decision was made; and</txt></block></li><li id="sch.2-def.decisionnotice-para1.d" guid="_a0aabe21-35a6-467b-b84c-174258524dad" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">any appeal rights that the recipient of the notice has in relation to the decision.</txt></block></li></list></definition><definition id="sch.2-def.deemedapproval_" guid="_85c235ba-7ad7-4323-940b-4b113dd4b457" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.deemedapproval" guid="_f6b50226-a4a1-4e48-84d0-ac4e1a955b55" type="definition">deemed approval</defterm> see section 64(5).</txt></definition><definition id="sch.2-def.deemedapprovalnotice_" guid="_9cb5a44d-6b1d-41b6-8117-77dc0c7caf65" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.deemedapprovalnotice" guid="_998002e5-62d0-4351-8b6a-eeece21c2349" type="definition">deemed approval notice</defterm> see section 64(3).</txt></definition><definition id="sch.2-def.deemedrefusal_" guid="_3bce8226-2859-4f9b-935c-3c2bd8f3aca3" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.deemedrefusal" guid="_555308e2-dc35-4c16-843c-98a776adba2e" type="definition">deemed refusal</defterm> means a refusal that is taken to have happened if a decision has not been made when the following ends—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.deemedrefusal-para1.a" guid="_722d1e42-cda0-4312-ba53-c7ab584b8821" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for a development application, other than an application to which section 64 applies—the period, under the development assessment rules, for making a decision;</txt></block></li><li id="sch.2-def.deemedrefusal-para1.b" guid="_b090f66e-8f94-4bae-9449-6c45a9aeea00" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for a matter as follows—the period allowed under this Act for the matter to be decided—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.deemedrefusal-para1.b-para2.i" guid="_36f2a8d8-025c-4bbd-905a-6a86caad6923" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a change application;</txt></block></li><li id="sch.2-def.deemedrefusal-para1.b-para2.ii" guid="_875f6bca-2619-464c-9550-98ac01f0a79f" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">an extension application;</txt></block></li><li id="sch.2-def.deemedrefusal-para1.b-para2.iii" guid="_dd3325dd-7801-415d-90cc-ba0edaf71800" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">a conversion application;</txt></block></li><li id="sch.2-def.deemedrefusal-para1.b-para2.iv" guid="_276bc89d-a260-48ca-8d50-6aa44afdb959" status="uncommenced" provision.type="other"><no>(iv)</no><block status="uncommenced"><txt break.before="1">a compensation claim under section 31(6);</txt></block></li><li id="sch.2-def.deemedrefusal-para1.b-para2.v" guid="_86167d47-f8c1-44b3-a206-21ebf9ecabdf" status="uncommenced" provision.type="other"><no>(v)</no><block status="uncommenced"><txt break.before="1">a claim for compensation under section 265.</txt></block></li></list></block></li></list></definition><definition id="sch.2-def.designatedpremises_" guid="_c868efda-e1b8-4e2b-a3d8-551a241c6ba9" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.designatedpremises" guid="_c9359dd1-f4eb-488f-9a31-84ef50c301e9" type="definition">designated premises</defterm> means premises that are the subject of a designation.</txt></definition><definition id="sch.2-def.designation_" guid="_1bad6110-0682-45f3-9436-4697e389ea8a" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.designation" guid="_ccb71699-4a36-4210-9d3a-84e9258ff7d7" type="definition">designation</defterm> see section 35(1).</txt></definition><definition id="sch.2-def.designator_" guid="_b9391e8e-9444-433e-aef5-18453a8888df" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.designator" guid="_2444f5f0-651b-4c02-9c84-ac6de2c3082a" type="definition">designator</defterm> see section 35(1).</txt></definition><definition id="sch.2-def.development_" guid="_1e1d9a88-935c-4e00-9d0f-0b45dcc29885" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.development" guid="_ad041791-cb4d-4043-9984-3a3c2675d6c2" type="definition">development</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.development-para1.a" guid="_03d4e3c0-691a-4217-be78-beda2778f9e0" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">carrying out—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.development-para1.a-para2.i" guid="_42eb2600-1f13-48e4-a328-c9eb4ca79204" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">building work; or</txt></block></li><li id="sch.2-def.development-para1.a-para2.ii" guid="_83013e0f-6527-4272-a373-f0db509e7bd5" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">plumbing or drainage work; or</txt></block></li><li id="sch.2-def.development-para1.a-para2.iii" guid="_52fad247-b765-46de-acb1-e81058a7dd92" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">operational work; or</txt></block></li></list></block></li><li id="sch.2-def.development-para1.b" guid="_536d69a4-65fa-4515-a284-eabc365c187d" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">reconfiguring a lot; or</txt></block></li><li id="sch.2-def.development-para1.c" guid="_cde764ed-e3d9-40d1-8a6a-72e4e8922c94" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">making a material change of use of premises.</txt></block></li></list></definition><definition id="sch.2-def.developmentapplication_" guid="_6640d38e-fde4-4d9f-b641-6545ffc6e837" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.developmentapplication" guid="_0fc67fc7-e192-4958-9ee2-09ecf6be20d2" type="definition">development application</defterm> means an application for a development approval.</txt></definition><definition id="sch.2-def.developmentapproval_" guid="_4ee66eae-fc89-4756-be36-7488309a3ed5" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.developmentapproval" guid="_f5ee018a-55c2-49f0-9909-ee3a69246f54" type="definition">development approval</defterm> see section 49(1).</txt></definition><definition id="sch.2-def.developmentassessmentprocess_" guid="_8aa064eb-3ccf-47a5-9311-29215b15cc62" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.developmentassessmentprocess" guid="_2d4f454b-e20d-42e2-92a3-97bf274896c9" type="definition">development assessment process</defterm> means the process for administering applications under chapter 3.</txt></definition><definition id="sch.2-def.developmentassessmentrules_" guid="_a9a6f25b-594c-436e-870f-65c778021486" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.developmentassessmentrules" guid="_810f8b64-16a2-40f3-9b55-da9191fe3fc3" type="definition">development assessment rules</defterm> see section 68(1).</txt></definition><definition id="sch.2-def.developmentassessmentsystem_" guid="_6b24b3d1-c24d-4392-94c8-8d187bbbc61e" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.developmentassessmentsystem" guid="_3f1f3f51-2436-4d5f-bf97-e4ab275fe14d" type="definition">development assessment system</defterm> means a system described in section 4(f).</txt></definition><definition id="sch.2-def.developmentcondition_" guid="_98766a63-d256-4240-9233-1593988dd050" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.developmentcondition" guid="_8fc4dfdb-c125-4785-9ec0-0f9da0a0b515" type="definition">development condition</defterm> means a condition that a development approval is subject to, including a condition—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.developmentcondition-para1.a" guid="_fad6dbe9-b083-4f85-b1e6-1d821de25745" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the assessment manager imposes under section 60; or</txt></block></li><li id="sch.2-def.developmentcondition-para1.b" guid="_be4b215d-720d-435c-8f61-d53a94280f44" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">directed to be imposed under section 56 or 95(1)(d); or</txt></block></li><li id="sch.2-def.developmentcondition-para1.c" guid="_5cfcad9c-f19b-4c1e-90e9-b7d4748d929b" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">taken to have been imposed under section 64.</txt></block></li></list><note id="sch.2-def.developmentcondition-note" guid="_7eeac3ff-15e2-4d71-9a66-a507dccb3c59" type="example"><heading id="sch.2-def.developmentcondition-note-he" guid="_28f539b0-9165-4cf2-b971-4b2ba8bf6e37">Note—</heading><block status="uncommenced"><txt break.before="1">Also see the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Environmental Offsets Act 2014</name></legref>, section 16 which provides for deemed conditions on development approvals.</txt></block></note></definition><definition id="sch.2-def.developmentinfrastructure_" guid="_38f1679a-284e-457f-a455-569fbaa96005" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.developmentinfrastructure" guid="_55eeb82b-9e84-4bfc-aec2-2df83940724c" type="definition">development infrastructure</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.developmentinfrastructure-para1.a" guid="_67d8b1d0-25bb-4c5d-8099-efe352530462" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">land or works, or both land and works, for—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.developmentinfrastructure-para1.a-para2.i" guid="_ba41eb2b-c56b-40ee-afca-f8f5bc9d0058" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">water cycle management infrastructure, including infrastructure for water supply, sewerage, collecting water, treating water, stream managing, disposing of waters and flood mitigation, but not water cycle management infrastructure that is State infrastructure; or</txt></block></li><li id="sch.2-def.developmentinfrastructure-para1.a-para2.ii" guid="_af4b1a9f-da77-43bb-a21c-829274e749ee" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">transport infrastructure, including roads, vehicle lay-bys, traffic control devices, dedicated public transport corridors, public parking facilities predominantly serving a local area, cycleways, pathways and ferry terminals; or</txt></block></li><li id="sch.2-def.developmentinfrastructure-para1.a-para2.iii" guid="_eee2cf38-4009-4798-b236-988d11edd55a" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">public parks infrastructure, including playground equipment, playing fields, courts and picnic facilities; or</txt></block></li></list></block></li><li id="sch.2-def.developmentinfrastructure-para1.b" guid="_b8d34651-fe2a-441f-8145-3cf161f14706" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">land, and works that ensure the land is suitable for development, for local community facilities, like—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.developmentinfrastructure-para1.b-para2.i" guid="_6ba3c81b-9c3f-44e0-b104-65e11fe64549" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">community halls or centres; or</txt></block></li><li id="sch.2-def.developmentinfrastructure-para1.b-para2.ii" guid="_10dd29cc-90d6-4d28-b835-6106f8a77a80" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">public recreation centres; or</txt></block></li><li id="sch.2-def.developmentinfrastructure-para1.b-para2.iii" guid="_9c991c56-8df9-48c1-b869-76362e11fc3b" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">public libraries.</txt></block></li></list></block></li></list></definition><definition id="sch.2-def.developmentoffence_" guid="_c9f6f773-69c7-44ed-a9c7-800293751b75" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.developmentoffence" guid="_88d042df-ac27-4e52-82b6-27b60e64bc1f" type="definition">development offence</defterm> see section 161.</txt></definition><definition id="sch.2-def.developmentpermit_" guid="_12d17142-e00f-43d1-ae41-7cc231e111db" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.developmentpermit" guid="_ee5182b3-d6a1-4585-a90c-a717941201d3" type="definition">development permit</defterm> see section 49(3).</txt></definition><definition id="sch.2-def.developmenttribunal_" guid="_5c1fd0fa-c739-4269-9b13-d052150759a3" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.developmenttribunal" guid="_2b672119-0f56-493c-b727-e8178b17904c" type="definition">development tribunal</defterm> means a tribunal established under section 235.</txt></definition><definition id="sch.2-def.direction_" guid="_f5c74b13-530d-4afd-8756-4c140c142347" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.direction" guid="_6b294e03-08ca-48d6-b660-b3e52a456706" type="definition">direction</defterm> means a written direction.</txt></definition><definition id="sch.2-def.disposalorder_" guid="_3cc095a6-7308-424a-b074-45d908b2887f" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.disposalorder" guid="_3056e78f-040b-4ea2-8144-20a030246c7f" type="definition">disposal order</defterm> see section 214(2).</txt></definition><definition id="sch.2-def.distributorretailer_" guid="_d14d04fa-63ec-4e3b-830d-f44c922bfef1" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.distributorretailer" guid="_eb836fd2-855e-49ac-856d-f0a9a2d367be" type="definition">distributor-retailer</defterm> see the <legref jurisd="QLD" type="act" check="unknown">SEQ Water Act</legref>, section 8.</txt></definition><definition id="sch.2-def.document_" guid="_eb1a5622-c42a-4c0b-8163-dfb4b9bc7750" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.document" guid="_a01a5a8a-d0f5-4092-95b7-242750b13b48" type="definition">document</defterm> includes information.</txt></definition><definition id="sch.2-def.drainagework_" guid="_f9c5ae5a-4cad-44d7-819c-d778d8f6d80f" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.drainagework" guid="_ac36d71f-d6fa-4bf2-847d-40675e4128b3" type="definition">drainage work</defterm> see the <legref jurisd="QLD" type="act" check="unknown">Plumbing and Drainage Act</legref>.</txt></definition><definition id="sch.2-def.duplicatewarrant_" guid="_f08b7f28-e233-4dae-87d5-53964cf52f43" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.duplicatewarrant" guid="_66a0845a-701f-44e8-8159-73ab65ab7de3" type="definition">duplicate warrant</defterm> see section 194(2).</txt></definition><definition id="sch.2-def.effectiveday_" guid="_f926c589-db04-4749-9106-e8d040e61b6a" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.effectiveday" guid="_3fbad6c4-d558-4085-9447-cb9ffe9fdd73" type="definition">effective day</defterm> see section 9(2).</txt></definition><definition id="sch.2-def.electronicapplication_" guid="_137e8747-7c91-48b6-87c0-496c5956b4cb" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.electronicapplication" guid="_82db1190-7e14-48d1-8437-fe917e062a8f" type="definition">electronic application</defterm> see section 193.</txt></definition><definition id="sch.2-def.electronicdocument_" guid="_43f56189-446d-441a-9008-6f5604be1f42" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.electronicdocument" guid="_e524c384-4470-430b-9b95-7a87cc29943a" type="definition">electronic document</defterm> means a document stated in the <legref jurisd="QLD" type="act" check="unknown">Interpretation Act</legref>, schedule 1, definition <defterm guid="_1c0a4dad-eaf3-40b3-b986-396e633f5a8d" type="mention">document</defterm>, paragraph (c). </txt></definition><definition id="sch.2-def.eligibleadviceagency_" guid="_d16a4f4b-d390-4a7a-b138-a0a022eac45f" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.eligibleadviceagency" guid="_c4aaef47-5a72-4a20-a380-8be739db800f" type="definition">eligible advice agency</defterm>, for a development application or change application, means an advice agency that—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.eligibleadviceagency-para1.a" guid="_0a7f68c4-9d68-4636-a28c-57fc1ab0337a" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">has told the assessment manager in the advice agency’s referral agency’s response to treat the response as a properly made submission; and</txt></block></li><li id="sch.2-def.eligibleadviceagency-para1.b" guid="_9f37f5f2-d474-409f-ba92-b075be9db736" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">has not given the assessment manager a notice stating the agency will not be appealing before the appeal period ends for the application.</txt></block></li></list></definition><definition id="sch.2-def.eligiblesubmitter_" guid="_1976abe2-cf21-4b82-9be5-a6a096375eb1" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.eligiblesubmitter" guid="_fa6ab7e1-fb0e-4baf-9b40-3db9073783a2" type="definition">eligible submitter</defterm>, for a development application or change application, means a submitter—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.eligiblesubmitter-para1.a" guid="_4e04aba6-42a0-4b86-ac61-cf09d6d31597" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">whose submission was not withdrawn before the application was decided; and</txt></block></li><li id="sch.2-def.eligiblesubmitter-para1.b" guid="_2feaa038-3e03-476e-86ee-bbe66a0d1eef" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">who has not given the assessment manager a notice stating the submitter will not be appealing before the appeal period ends for the application.</txt></block></li></list></definition><definition id="sch.2-def.emissions_" guid="_4aa0e6fb-6809-4253-b1aa-e0f21472860c" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.emissions" guid="_b5ff8bca-4ebe-4aee-8d19-c3225fb2540a" type="definition">emissions</defterm> means emissions of aerosols, fumes, light, noise, odour, particles or smoke.</txt></definition><definition id="sch.2-def.enforcementauthority_" guid="_1c570711-7067-48a0-8b0b-72943c6b2358" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.enforcementauthority" guid="_1ebf859d-13c8-4ad7-a052-636222b76b67" type="definition">enforcement authority</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.enforcementauthority-para1.a" guid="_d18d2a05-f18e-47b0-afec-27178782a3e5" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for assessable development that is the subject of a development approval—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.enforcementauthority-para1.a-para2.i" guid="_9a97ead6-60fe-4e6f-81e9-0c719d1cb846" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the assessment manager, including a chosen assessment manager; or</txt></block></li><li id="sch.2-def.enforcementauthority-para1.a-para2.ii" guid="_0fe1d47b-19a5-4ae3-9a14-a92dbd68fb39" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">a referral agency for matters within the agency’s functions for the development application; or</txt></block></li><li id="sch.2-def.enforcementauthority-para1.a-para2.iii" guid="_733b79f5-8407-46fc-b389-0dda41772100" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">if the chief executive is the assessment manager or a referral agency—a person that the chief executive nominates by written notice to the person; or</txt></block></li><li id="sch.2-def.enforcementauthority-para1.a-para2.iv" guid="_707bccc5-beb5-4d85-bcc3-5d096c11987d" status="uncommenced" provision.type="other"><no>(iv)</no><block status="uncommenced"><txt break.before="1">if a private certifier (class A) performed private certifying functions for the development application, under the Building Act—the certifier or the local government; or</txt></block></li></list></block></li><li id="sch.2-def.enforcementauthority-para1.b" guid="_cfacd068-ba85-48b7-8cab-d05aaded1359" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for assessable development that is not the subject of a development approval—the person who would have been the enforcement authority under paragraph (a) had a development approval been given; or</txt></block></li><li id="sch.2-def.enforcementauthority-para1.c" guid="_c9342f56-4ea4-4c84-bdd2-9bf77656bdbf" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">for building or plumbing work carried out by or for a public sector entity—the chief executive, however described, of the entity; or</txt></block></li><li id="sch.2-def.enforcementauthority-para1.d" guid="_d935a1d0-75b2-4a5c-9dd5-f2970cd2a3c5" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">for any other matter—the local government.</txt></block></li></list></definition><definition id="sch.2-def.enforcementnotice_" guid="_6f6bc807-4ab8-41fd-8dcb-ecec1f049a41" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.enforcementnotice" guid="_44258a23-6615-4e4d-a98b-f149a6d01fd6" type="definition">enforcement notice</defterm> see section 168(2).</txt></definition><definition id="sch.2-def.enforcementorder_" guid="_cd88a608-5e67-4f99-94c8-d97ff75c86ec" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.enforcementorder" guid="_e41937f8-39a7-4953-8579-919f96c6f972" type="definition">enforcement order</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.enforcementorder-para1.a" guid="_35037eda-54e1-4854-8fda-56356643ad83" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for an enforcement order made by the Magistrates Court—see section 176(1); or</txt></block></li><li id="sch.2-def.enforcementorder-para1.b" guid="_4cf0a0cc-9497-4860-849b-7c8f3d6baf91" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for an enforcement order made by the P&#38;E Court—see section 180(2).</txt></block></li></list></definition><definition id="sch.2-def.environment_" guid="_3c8b6ce0-df0c-473a-a3a8-d24d971d1f05" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.environment" guid="_6f337adc-f07c-4ca5-959e-a5724720b9e1" type="definition">environment</defterm> see the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="no">Environmental Protection Act</name></legref>, section 8.</txt></definition><definition id="sch.2-def.EnvironmentalProtectionAct_" guid="_b7b81ad5-85ff-407a-aa1d-4dc32b59fb76" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.EnvironmentalProtectionAct" guid="_2964f9eb-3a83-43c7-a2ec-55784ad9fbb4" type="definition">Environmental Protection Act</defterm> means the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Environmental Protection Act 1994</name></legref>.</txt></definition><definition id="sch.2-def.establishmentcost_" guid="_1d64ca99-96e2-4731-ab0e-caad481efba6" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.establishmentcost" guid="_f1320a89-368d-4600-a490-1fe9e0353175" type="definition">establishment cost</defterm>, for trunk infrastructure, means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.establishmentcost-para1.a" guid="_b612b8b1-018f-40e5-847e-30defa995b4b" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for existing infrastructure—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.establishmentcost-para1.a-para2.i" guid="_e31d706d-4dd2-4222-8ad5-c049e82ca6c8" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the current replacement cost of the infrastructure as reflected in the relevant local government’s asset register; and</txt></block></li><li id="sch.2-def.establishmentcost-para1.a-para2.ii" guid="_f03ecab0-52fe-4c8e-81cd-bce6b32ca000" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the current value of the land acquired for the infrastructure; or</txt></block></li></list></block></li><li id="sch.2-def.establishmentcost-para1.b" guid="_b0c776cd-aebd-4f7a-8178-46ae007fb428" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for future infrastructure—all costs of land acquisition, financing, and design and construction, for the infrastructure.</txt></block></li></list></definition><definition id="sch.2-def.examine_" guid="_1d9ccd66-bf9b-48db-a676-18139ddc3901" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.examine" guid="_7924c231-64c7-4e90-b611-626780e40ace" type="definition">examine</defterm> includes analyse, test, account, measure, weigh, grade, gauge and identify.</txt></definition><definition id="sch.2-def.excludedpremises_" guid="_7604cabc-49f3-400c-8185-a2ec61b08569" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.excludedpremises" guid="_fa2b8e4d-ea51-4eda-a401-a06d18016477" type="definition">excluded premises </defterm>means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.excludedpremises-para1.a" guid="_0447763e-5933-44cb-8773-45bd4eff7eb2" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">generally—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.excludedpremises-para1.a-para2.i" guid="_f4b45c7b-6437-4842-9b31-4cf6de55cf20" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">premises that are a servient tenement for an easement, if the development is consistent with the easement’s terms; or</txt></block></li><li id="sch.2-def.excludedpremises-para1.a-para2.ii" guid="_842af61f-8341-4a69-a07b-eb98b5c74f2f" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">premises that are acquisition land, if the application or development approval relates to the purpose for which the land is to be taken or acquired; or</txt></block></li></list></block></li><li id="sch.2-def.excludedpremises-para1.b" guid="_73e98329-3e8d-4088-a56f-6c5c05245aed" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for a change application or extension application—premises in relation to which 1 or more of the following apply for the application—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.excludedpremises-para1.b-para2.i" guid="_1cc2873c-6c7a-4cc6-833a-5120e70c765d" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the development approval to which the approval relates is for building work for supplying infrastructure on designated premises; or</txt></block></li><li id="sch.2-def.excludedpremises-para1.b-para2.ii" guid="_b9a98465-f5b4-43c4-8827-c514158e4480" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">the responsible entity or assessment manager considers the application does not materially affect the premises and that, given the nature of the change, the owner of the premises has unreasonably withheld consent; or</txt></block></li><li id="sch.2-def.excludedpremises-para1.b-para2.iii" guid="_0ca5e372-1b8e-42ba-bc63-5f158764f12b" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">the responsible entity or assessment manager considers the application does not materially affect the premises and that because of the number of owners, it is impracticable to get their consent.</txt><note id="sch.2-def.excludedpremises-para1.b-para2.iii-note" guid="_32868994-4247-48d0-8a73-0872aece1d80" type="example"><heading id="sch.2-def.excludedpremises-para1.b-para2.iii-note-he" guid="_7b8d9703-8e37-47b0-b2f2-01ab311e3163">Example of when owners’ consent may be impracticable—</heading><block status="uncommenced"><txt break.before="1">Since the development approval was given, the premises have been subdivided and now has many owners.</txt></block></note></block></li></list></block></li></list></definition><definition id="sch.2-def.executiveofficer_" guid="_46b7ed6f-0d9e-484a-93ef-a13d795777da" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.executiveofficer" guid="_db926de4-683c-4915-af94-e9a1944f7201" type="definition">executive officer</defterm>, of a corporation, means a person who is concerned with or takes part in the management of the corporation, whether or not the person is a director or the person’s position is given the title of executive officer.</txt></definition><definition id="sch.2-def.extensionapplication_" guid="_ac402d34-47b4-4ba6-aa25-3f68ee97d4a8" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.extensionapplication" guid="_b1220e5e-aa4f-4e2e-aa52-65d908d5a8c6" type="definition">extension application</defterm> see section 86(1).</txt></definition><definition id="sch.2-def.extrapaymentcondition_" guid="_9d66bab9-c825-485f-bfef-d983c55f299c" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.extrapaymentcondition" guid="_2bf9d2dd-b00a-44a8-ae6f-8bd3c40b9fba" type="definition">extra payment condition</defterm> see section 130(1).</txt></definition><definition id="sch.2-def.finalinspectioncertificate_" guid="_03bbcfd7-c067-413e-8446-8cf3a121cacc" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.finalinspectioncertificate" guid="_573fdc04-6978-463b-9340-321217f38d09" type="definition">final inspection certificate</defterm> see the <legref jurisd="QLD" type="act" check="unknown">Building Ac</legref>t.</txt></definition><definition id="sch.2-def.findsadefendantguilty_" guid="_8a1ca0cd-4699-41ba-aac7-43261818d8c5" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.findsadefendantguilty" guid="_f5618635-3617-4086-a974-e4bf7caf7f69" type="definition">finds a defendant guilty</defterm> includes accept a plea of guilty, whether or not a conviction is recorded.</txt></definition><definition id="sch.2-def.formerowner_" guid="_c861bdd3-8418-45e4-a36f-9401a9d7d065" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.formerowner" guid="_306d6b84-8abf-4381-b659-306a9497157f" type="definition">former owner</defterm> see section 212(4).</txt></definition><definition id="sch.2-def.function_" guid="_73818ccc-57c3-4769-b393-28fd5c4b862a" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.function" guid="_e419249c-34ba-4496-b234-36b61723c9d3" type="definition">function</defterm> includes a power.</txt></definition><definition id="sch.2-def.HeritageAct_" guid="_46c90231-77e0-4874-8acc-02335cb9c3b5" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.HeritageAct" guid="_d1112921-70b0-43ef-ac9f-ca6c03908013" type="definition">Heritage Act</defterm> means the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Queensland Heritage Act 1992</name></legref>.</txt></definition><definition id="sch.2-def.impactassessment_" guid="_4bfe6124-293a-45ce-8d26-b2293bb5a322" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.impactassessment" guid="_ed63d6dc-30f9-44d2-a4d2-453e2b0d51ff" type="definition">impact assessment</defterm> see section 45(5).</txt></definition><definition id="sch.2-def.identitycard_" guid="_53561069-10ac-4619-a124-21578cf2dcf2" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.identitycard" guid="_a33ccd3c-cd9b-43d6-b906-858b91ba0036" type="definition">identity card</defterm> means an identity card issued under section 184(1).</txt></definition><definition id="sch.2-def.information_" guid="_4c8210ac-2f54-4f24-a30e-ccd7f0f287b6" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.information" guid="_3957082b-41b3-463c-bdae-532abbf4cac1" type="definition">information</defterm> includes information contained in a document.</txt></definition><definition id="sch.2-def.informationrequest_" guid="_25d4564b-a417-491b-8e6d-b0079016f830" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.informationrequest" guid="_70396148-f321-4b8b-b42d-e63a6a3f0d20" type="definition">information request</defterm>, in relation to an application, means a notice that asks the applicant for further information in relation to the application.</txt></definition><definition id="sch.2-def.infrastructure_" guid="_1e8e5c13-8df3-49fd-b34a-1b12635d7cb7" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.infrastructure" guid="_7c1c4a00-aaa1-4b8a-8302-11fa06bc4883" type="definition">infrastructure</defterm> does not include land, facilities, services or works for an environmental offset.</txt></definition><definition id="sch.2-def.infrastructureagreement_" guid="_0a25828d-e08c-4191-bb45-45ed80920a9f" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.infrastructureagreement" guid="_cf7dca4d-7891-4e33-9b78-488c34d96131" type="definition">infrastructure agreement</defterm> see section 150.</txt></definition><definition id="sch.2-def.infrastructurechargesnotice_" guid="_f3530d27-f7f1-4d70-803d-0b757a3689de" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.infrastructurechargesnotice" guid="_b98c6c4c-c2e4-4169-ae82-26973b6352b2" type="definition">infrastructure charges notice</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.infrastructurechargesnotice-para1.a" guid="_72a38e22-9517-4ae4-b400-f79c14381e19" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if an infrastructure charges notice is replaced by a replacement infrastructure charges notice under section 76(6)—the replacement infrastructure charges notice; or</txt></block></li><li id="sch.2-def.infrastructurechargesnotice-para1.b" guid="_2890d226-9e9b-43b0-b70f-e591a0ba9a79" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if an infrastructure charges notice is replaced by a negotiated notice under section 125(3)—the negotiated notice; or</txt></block></li><li id="sch.2-def.infrastructurechargesnotice-para1.c" guid="_a347b630-d7f8-4d02-902b-a6c13aef7f00" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">if an infrastructure charges notice is amended under section 119(6), 137(4) or 142(4)(b)—the notice as amended; or</txt></block></li><li id="sch.2-def.infrastructurechargesnotice-para1.d" guid="_28e4c621-d599-4b3b-9e38-04dfbdcbee32" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">otherwise—an infrastructure charges notice given under section 119(2) or (5) or 142(4)(a).</txt></block></li></list></definition><definition id="sch.2-def.inspector_" guid="_49e4b29c-49f2-4a3c-bb02-a5638d16afb7" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.inspector" guid="_b727f20f-01af-40ef-84d8-6fbe3cc975d9" type="definition">inspector</defterm> means a person who holds office as an inspector under chapter 5, part 6.</txt></definition><definition id="sch.2-def.interimenforcementorder_" guid="_67248023-7621-4ef6-9d83-7fa416f4ccfc" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.interimenforcementorder" guid="_378849c4-9f19-4aea-9681-685b5ca9e7f9" type="definition">interim enforcement order</defterm> see section 180(4).</txt></definition><definition id="sch.2-def.InterpretationAct_" guid="_f01120c6-164a-410d-9c51-1b833d3813c7" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.InterpretationAct" guid="_8254ef07-91e0-4142-a442-bb404fd0eaee" type="definition">Interpretation Act</defterm> means the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Acts Interpretation Act 1954</name></legref>.</txt></definition><definition id="sch.2-def.JudicialReviewAct_" guid="_f1a6a012-0f52-4ba7-8013-8fb3f1d700e4" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.JudicialReviewAct" guid="_8c8d6fe5-1e12-46f0-b08b-27ea0a7e29f6" type="definition">Judicial Review Act</defterm> means the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Judicial Review Act 1991</name></legref>.</txt></definition><definition id="sch.2-def.land_" guid="_53264365-2ebf-4654-9953-9c30be7f01ad" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.land" guid="_27acc7a2-00e5-4607-9829-04ce3e995378" type="definition">land</defterm> includes—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.land-para1.a" guid="_88aa3d9b-c782-4516-be25-cd5d3d033479" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">an estate in, on, over or under land; and</txt></block></li><li id="sch.2-def.land-para1.b" guid="_fbf79eba-eccb-4e34-a81e-a8b8ea6cf080" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the airspace above the land and any estate in the airspace; and</txt></block></li><li id="sch.2-def.land-para1.c" guid="_830a05f1-d105-488d-8c16-44e87c11862b" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">the subsoil of land and any estate in the subsoil.</txt></block></li></list></definition><definition id="sch.2-def.LandAct_" guid="_f823a4e3-b39f-4718-a1f7-11ed77edef9f" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.LandAct" guid="_3f9dcf6f-969d-44be-a309-aa33defb45ab" type="definition">Land Act</defterm> means the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Land Act 1994</name></legref>.</txt></definition><definition id="sch.2-def.LandTitleAct_" guid="_97f7b023-efac-47db-a294-bed2de4346fc" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.LandTitleAct" guid="_e3ac1846-3920-415c-b53a-eeb446d6c41f" type="definition">Land Title Act</defterm> means the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Land Title Act 1994</name></legref>.</txt></definition><definition id="sch.2-def.lawfuluse_" guid="_6d25e1f8-c9f8-46c2-b96c-26a6a048f1f9" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.lawfuluse" guid="_2e6acbb4-cbc0-440e-a9f3-5e34843b79da" type="definition">lawful use</defterm>, of premises, means a use of premises that is a natural and ordinary consequence of making a material change of use of the premises in compliance with this Act.</txt></definition><definition id="sch.2-def.leviedcharge_" guid="_86a7e1d9-4d52-49e3-8639-1d78801f74ca" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.leviedcharge" guid="_965ce67c-096e-4e46-9ed6-81ea1d6bf6c3" type="definition">levied charge</defterm> see section 119(12).</txt></definition><definition id="sch.2-def.LGIPlocalgovernmentinfrastructureplan_" guid="_b607149e-41b6-4f97-abf7-07ba54f8e43b" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.LGIPlocalgovernmentinfrastructureplan" guid="_fd70eac4-cd1e-4c6a-9b65-a299cd75fd8c" type="definition">LGIP (local government infrastructure plan)</defterm> means the part of a local government’s planning scheme that—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.LGIPlocalgovernmentinfrastructureplan-para1.a" guid="_143204c4-9908-431e-8b24-958e39fd00a9" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">has been prepared under the Minister’s rules; and</txt></block></li><li id="sch.2-def.LGIPlocalgovernmentinfrastructureplan-para1.b" guid="_f0f60c30-6800-416d-af9a-afbb700b5b20" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">does any or all of the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.LGIPlocalgovernmentinfrastructureplan-para1.b-para2.i" guid="_2658991d-0d78-4de0-8543-6fd1adbcfb7e" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">identifies a PIA;</txt></block></li><li id="sch.2-def.LGIPlocalgovernmentinfrastructureplan-para1.b-para2.ii" guid="_51f5a54e-9350-430d-bd1c-25c5e2092940" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">states assumptions about population and employment growth;</txt></block></li><li id="sch.2-def.LGIPlocalgovernmentinfrastructureplan-para1.b-para2.iii" guid="_b1602ae7-20a1-444f-87e0-6d3a64cb7512" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">states assumptions about the type, scale, location and timing of future development;</txt></block></li><li id="sch.2-def.LGIPlocalgovernmentinfrastructureplan-para1.b-para2.iv" guid="_58c0696e-7f7b-487a-b778-d8e138c6f1ed" status="uncommenced" provision.type="other"><no>(iv)</no><block status="uncommenced"><txt break.before="1">includes plans for trunk infrastructure;</txt></block></li><li id="sch.2-def.LGIPlocalgovernmentinfrastructureplan-para1.b-para2.v" guid="_bd4ff456-1506-401c-8a29-ef88f8af4262" status="uncommenced" provision.type="other"><no>(v)</no><block status="uncommenced"><txt break.before="1">states the desired standard of service for development infrastructure.</txt></block></li></list></block></li></list></definition><definition id="sch.2-def.localcategorisinginstrument_" guid="_4f21870e-36ee-431c-ad0c-fc5e2660a7fe" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.localcategorisinginstrument" guid="_292c66fd-2b6a-4e72-89f5-08b0916d0ef2" type="definition">local categorising instrument</defterm> see section 43(3).</txt></definition><definition id="sch.2-def.LocalGovernmentAct_" guid="_172ca968-31b3-4733-b1d0-fb8e71edfa3e" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.LocalGovernmentAct" guid="_b965af1f-1fcc-4206-a6cf-e2e29e88ba64" type="definition">Local Government Act</defterm> means the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Local Government Act 2009</name></legref>.</txt></definition><definition id="sch.2-def.localheritageplace_" guid="_c23fb3fd-6dc9-4ff3-9a9c-62c590d2d5d9" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.localheritageplace" guid="_54d32b27-7a5a-4829-8283-7431cfa0f07b" type="definition">local heritage place</defterm> see the <legref jurisd="QLD" type="act" check="unknown">Heritage Act</legref>, schedule.</txt></definition><definition id="sch.2-def.localplanninginstrument_" guid="_04ac4a42-fe06-431f-8a4c-7a9993b33cdc" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.localplanninginstrument" guid="_d6154ed2-fe69-4e2e-9e41-e5f60d29ecbd" type="definition">local planning instrument</defterm> see section 8(3).</txt></definition><definition id="sch.2-def.lot_" guid="_a237fce9-b804-4925-9870-9936ac7b3882" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.lot" guid="_e78e04ae-7d71-4746-af65-400b6ea6a81c" type="definition">lot</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.lot-para1.a" guid="_ee121343-ca25-4171-b868-50850aaa2453" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a lot under the <legref jurisd="QLD" type="act" check="unknown">Land Title Act</legref>; or</txt></block></li><li id="sch.2-def.lot-para1.b" guid="_25dbe635-79d3-4af5-98fd-e97e56e5da85" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a separate, distinct parcel of land for which an interest is recorded in a register under the <legref jurisd="QLD" type="act" check="unknown">Land Act</legref>; or</txt></block></li><li id="sch.2-def.lot-para1.c" guid="_61f9a2c2-1c89-4bad-8b69-6a2495b36ed7" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">common property for a community titles scheme under the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Body Corporate and Community Management Act 1997</name></legref>; or</txt></block></li><li id="sch.2-def.lot-para1.d" guid="_6528aa47-a4d1-43b6-99c4-f411d8db2240" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">a lot or common property to which the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Building Units and Group Titles Act 1980</name></legref> continues to apply; or</txt></block></li><li id="sch.2-def.lot-para1.e" guid="_ab9fd45a-05de-4df9-b783-9b3b0f1f110c" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">a community or precinct thoroughfare under the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Mixed Use Development Act 1993</name></legref>; or</txt></block></li><li id="sch.2-def.lot-para1.f" guid="_b88047bd-6e8a-4892-808d-c8c9ebfe672c" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">a primary or secondary thoroughfare under the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Integrated Resort Development Act 1987</name></legref> or the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Sanctuary Cove Resort Act 1985</name></legref>.</txt><note id="sch.2-def.lot-para1.f-note" guid="_2088b5bb-7e0d-4d6f-8da6-1eaac9f6a4f9" type="example"><heading id="sch.2-def.lot-para1.f-note-he" guid="_ebc5e5c2-c143-4d84-881e-d1a79ed4680d">Note—</heading><block status="uncommenced"><txt break.before="1">The <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Building Units and Group Titles Act 1980</name></legref> may continue to apply to the Acts stated in paragraphs (e) and (f), the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Registration of Plans (H.S.P. (Nominees) Pty. Limited) Enabling Act 1980</name></legref> and the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Registration of Plans (Stage 2) (H.S.P. (Nominees) Pty. Limited) Enabling Act 1984</name></legref>.</txt></block></note></block></li></list></definition><definition id="sch.2-def.materialchangeofuse_" guid="_5af2a249-188e-4407-aa49-308380e3a416" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.materialchangeofuse" guid="_fecfcebf-36a3-45ba-91b0-87e78ba377c9" type="definition">material change of use</defterm>, of premises, means any of the following that a regulation made under section 284(2)(a) does not prescribe to be minor change of use—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.materialchangeofuse-para1.a" guid="_f7bbe325-92ec-457b-b8e2-2426fbd3528a" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the start of a new use of the premises;</txt></block></li><li id="sch.2-def.materialchangeofuse-para1.b" guid="_89d8a5bf-d793-4100-9bc7-31d338b1d8da" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the re-establishment on the premises of a use that has been abandoned;</txt></block></li><li id="sch.2-def.materialchangeofuse-para1.c" guid="_f1cebf47-d7aa-482e-a968-f55de2bc9d4e" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">a material increase in the intensity or scale of the use of the premises.</txt></block></li></list></definition><definition id="sch.2-def.maximumadoptedcharge_" guid="_2f995523-e00e-4c0a-a36a-2a05eb29a27f" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.maximumadoptedcharge" guid="_42e2242d-4ebe-4848-8f50-f54b04c5993d" type="definition">maximum adopted charge</defterm> see section 112(2).</txt></definition><definition id="sch.2-def.Miltonrailprecinct_" guid="_623f3526-3492-43c0-b1a4-f4295eadf08e" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.Miltonrailprecinct" guid="_722284f2-0cc2-406c-96b4-75ae07bbe343" type="definition">Milton rail precinct</defterm> means the area called Milton rail precinct shown on the map in schedule 1 of the repealed <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Planning (Urban Encroachment—Milton Brewery) Act 2009</name></legref>.</txt></definition><definition id="sch.2-def.Minister_" guid="_b887c8e7-a010-444f-b712-7202ba2d576c" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.Minister" guid="_84d6a1c9-594a-4f70-9b75-eacf4c3f9eb0" type="definition">Minister</defterm>, for chapter 3, part 6, includes the Minister responsible for administering the State Development Act.</txt></definition><definition id="sch.2-def.Ministersguidelines_" guid="_174dd4b5-5c29-46f8-9ec2-06e72b5694c6" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.Ministersguidelines" guid="_f56e3ee7-e885-443e-b829-f3e795364e72" type="definition">Minister’s guidelines </defterm>means the guidelines made by the Minister under section 17.</txt></definition><definition id="sch.2-def.Ministersrules_" guid="_0e84637d-3716-4c1e-bebd-c5704ac62b2d" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.Ministersrules" guid="_1e273b69-5d4c-468e-a0db-c244af89be1d" type="definition">Minister’s rules </defterm>means the rules made by the Minister under section 17.</txt></definition><definition id="sch.2-def.minorchange_" guid="_2c09f1d3-4194-42fb-989c-d620e9c58a81" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.minorchange" guid="_56934ec6-f7cb-4cd4-8dee-8007e2851885" type="definition">minor change</defterm> means a change that—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.minorchange-para1.a" guid="_4ad74bc5-e56f-4c49-be65-12428ea660bd" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for a development application—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.minorchange-para1.a-para2.i" guid="_826d2c55-ac2d-4079-8fc2-2de0892e13ef" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">does not result in substantially different development; and</txt></block></li><li id="sch.2-def.minorchange-para1.a-para2.ii" guid="_a9404cfd-b8bd-4feb-827d-7f9dc5c6b0dc" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">if the application, including the change, were made when the change is made—would not cause—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.minorchange-para1.a-para2.ii-para3.A" guid="_f2cc0e3a-ff0b-4ac9-8306-4733312c2749" status="uncommenced" provision.type="other"><no>(A)</no><block status="uncommenced"><txt break.before="1">the inclusion of prohibited development in the application; or</txt></block></li><li id="sch.2-def.minorchange-para1.a-para2.ii-para3.B" guid="_96f2ebda-ba8b-4c55-a502-60d008162712" status="uncommenced" provision.type="other"><no>(B)</no><block status="uncommenced"><txt break.before="1">referral to a referral agency if there were no referral agencies for the development application; or</txt></block></li><li id="sch.2-def.minorchange-para1.a-para2.ii-para3.C" guid="_0f2b33d8-de7b-4c1a-8a66-db69fe6a74d4" status="uncommenced" provision.type="other"><no>(C)</no><block status="uncommenced"><txt break.before="1">referral to extra referral agencies; or</txt></block></li><li id="sch.2-def.minorchange-para1.a-para2.ii-para3.D" guid="_1b39f2b3-a384-411a-beae-a3b403996dbd" status="uncommenced" provision.type="other"><no>(D)</no><block status="uncommenced"><txt break.before="1">a referral agency to assess the application against, or have regard to, matters prescribed by regulation under section 55(2), other than matters the referral agency must have assessed the application against, or have had regard to, when the application was made; or</txt></block></li><li id="sch.2-def.minorchange-para1.a-para2.ii-para3.E" guid="_fd8d9918-e0b9-421a-a0cb-eb68b9e24e3c" status="uncommenced" provision.type="other"><no>(E)</no><block status="uncommenced"><txt break.before="1">public notification if public notification was not required for the development application; or</txt></block></li></list></block></li></list></block></li><li id="sch.2-def.minorchange-para1.b" guid="_c96c9e97-829f-46f5-8f0f-df4a3a7b732c" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for a development approval—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.minorchange-para1.b-para2.i" guid="_ff5d6c29-59dd-4305-9f74-bccf07123bcd" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">would not result in substantially different development; and</txt></block></li><li id="sch.2-def.minorchange-para1.b-para2.ii" guid="_83d7c7ac-a8a5-4474-80a2-673e95784162" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">if a development application for the development, including the change, were made when the change application is made would not cause—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.minorchange-para1.b-para2.ii-para3.A" guid="_2decb7c4-c3e5-4a66-9665-9bf330fd872a" status="uncommenced" provision.type="other"><no>(A)</no><block status="uncommenced"><txt break.before="1">the inclusion of prohibited development in the application; or</txt></block></li><li id="sch.2-def.minorchange-para1.b-para2.ii-para3.B" guid="_467d64f2-73e6-42f9-84a8-3357c16c650e" status="uncommenced" provision.type="other"><no>(B)</no><block status="uncommenced"><txt break.before="1">referral to a referral agency, other than to the chief executive, if there were no referral agencies for the development application; or</txt></block></li><li id="sch.2-def.minorchange-para1.b-para2.ii-para3.C" guid="_163e3bb0-401a-42e0-bfaa-c2a2bdd92129" status="uncommenced" provision.type="other"><no>(C)</no><block status="uncommenced"><txt break.before="1">referral to extra referral agencies, other than to the chief executive; or</txt></block></li><li id="sch.2-def.minorchange-para1.b-para2.ii-para3.D" guid="_e2a77398-7501-48ba-a858-cabb51199e1f" status="uncommenced" provision.type="other"><no>(D)</no><block status="uncommenced"><txt break.before="1">a referral agency to assess the application against, or have regard to, matters prescribed by regulation under section 55(2), other than matters the referral agency must have assessed the application against, or have had regard to, when the application was made; or</txt></block></li><li id="sch.2-def.minorchange-para1.b-para2.ii-para3.E" guid="_dc6b3138-ed74-44b9-9e74-dbaa510814ea" status="uncommenced" provision.type="other"><no>(E)</no><block status="uncommenced"><txt break.before="1">public notification if public notification was not required for the development application.</txt></block></li></list></block></li></list></block></li></list></definition><definition id="sch.2-def.necessaryinfrastructurecondition_" guid="_bd9472a5-a56b-4af5-9f66-4da82f15a7fe" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.necessaryinfrastructurecondition" guid="_66b8601a-5c79-4d07-ba99-dfb6f5142941" type="definition">necessary infrastructure condition</defterm> see section 127(2).</txt></definition><definition id="sch.2-def.negotiateddecisionnotice_" guid="_efc52c31-c395-4027-bef2-e2c13d5de61f" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.negotiateddecisionnotice" guid="_3057a6be-a099-434f-9db7-0e2b50ee2d93" type="definition">negotiated decision notice</defterm> see section 76(3).</txt></definition><definition id="sch.2-def.negotiatednotice_" guid="_caae351e-46b1-44df-a153-f7f363bd9f29" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.negotiatednotice" guid="_dde77331-5957-4d2d-b9d1-715507cb4ff5" type="definition">negotiated notice</defterm> see section 125(3).</txt></definition><definition id="sch.2-def.nontrunkinfrastructure_" guid="_cb9592e5-6553-45b1-8bdd-6ce5c0e97678" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.nontrunkinfrastructure" guid="_ef831852-9dc7-48bd-a838-ab5d4a958f2e" type="definition">non-trunk infrastructure</defterm> means development infrastructure that is not trunk infrastructure.</txt></definition><definition id="sch.2-def.notice_" guid="_285f3213-e65e-4ed7-9b2f-84e1d500d33e" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.notice" guid="_465469a8-4dcc-4c97-8b99-9e1bc09dc792" type="definition">notice</defterm> means a written notice.</txt></definition><definition id="sch.2-def.occupier_" guid="_a2e02721-e879-4878-ac88-11b071ddc485" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.occupier" guid="_3f5bcb5f-7afb-4385-87b1-c48fed5ccd43" type="definition">occupier</defterm>, of a place, for chapter 5, part 7, includes the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.occupier-para1.a" guid="_824ff76a-cd8b-47d1-a355-87f8b3db56aa" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if there is more than 1 person who apparently occupies the place—any 1 of the persons;</txt></block></li><li id="sch.2-def.occupier-para1.b" guid="_78f5093b-b352-4029-a582-66d52ac2cd97" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a person at the place who is apparently acting with the authority of a person who apparently occupies the place;</txt></block></li><li id="sch.2-def.occupier-para1.c" guid="_07da1ced-b7c7-4860-8160-d4c4e1264655" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">if no-one apparently occupies the place—an owner of the place.</txt></block></li></list></definition><definition id="sch.2-def.of_" guid="_f3808637-e3cf-4b35-b127-bf346ff73b7d" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.of" guid="_d867d5fe-61b8-4a81-947e-29c0e880cbf2" type="definition">of</defterm>, a place, includes at or on the place.</txt></definition><definition id="sch.2-def.offenceproceedings_" guid="_0a067842-9a39-4425-b066-3b3565bc5d46" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.offenceproceedings" guid="_efb70f7d-df51-4e49-94a9-92c4000a4639" type="definition">offence proceedings</defterm> see section 174(1).</txt></definition><definition id="sch.2-def.offencewarning_" guid="_62d35bd6-0a71-4e8a-814d-14e3433c7369" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.offencewarning" guid="_e1b70d44-f085-4d51-bf33-0cf2cb50f3de" type="definition">offence warning</defterm>, for a requirement made by an inspector, means a warning that, without a reasonable excuse, it is an offence for the person to whom the requirement is made not to comply with the requirement.</txt></definition><definition id="sch.2-def.oldAct_" guid="_35ed0f86-3616-4d58-bac2-cdb943ffd1a5" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.oldAct" guid="_db070075-1262-49ed-a532-3f848ad07074" type="definition">old Act</defterm> see section 285(1).</txt></definition><definition id="sch.2-def.operationalwork_" guid="_d25fd85c-79f2-47e5-94f8-49182b1d1bc6" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.operationalwork" guid="_256ffaac-74f1-4705-b698-e8c66be0475b" type="definition">operational work</defterm> means work, other than building work or plumbing or drainage work, in, on, over or under premises that materially affects premises or the use of premises.</txt></definition><definition id="sch.2-def.owner_" guid="_b3d6b6c0-cb92-40ca-9334-983ffcf24a97" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.owner" guid="_8e443265-f8ee-4f46-8bf5-8fc6dec28d40" type="definition">owner</defterm>, of a thing that has been seized, includes a person who would be entitled to possession of the thing if the thing had not been seized.</txt></definition><definition id="sch.2-def.owner_-oc.2" guid="_c0f23aab-1ba8-4af5-8bf6-b61ac9df9508" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.owner-def.owner" guid="_4a97d3b7-1231-4044-bfc9-8c9cace82670" type="definition">owner</defterm>, of land, premises or a place, means the person who—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.owner-oc.2-para1.a" guid="_13d7a0d9-1ff1-40f4-99e6-25f1d6c57ca5" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">is entitled to receive rent for the land, premises or place; or</txt></block></li><li id="sch.2-def.owner-oc.2-para1.b" guid="_14483a79-f915-4557-99e6-eccdaccfbffa" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">would be entitled to receive rent for the land, premises or place if the land, premises or place were rented to a tenant.</txt></block></li></list><note id="sch.2-def.owner-oc.2-note" guid="_b97809cc-7177-419c-a0fa-cd94db642f8d" type="example"><heading id="sch.2-def.owner-oc.2-note-he" guid="_4d8cd2d4-199a-4090-afe9-1cfed14d8baf">Note—</heading><block status="uncommenced"><txt break.before="1">See the <legref jurisd="QLD" type="act" check="unknown">Transport Infrastructure Act</legref>, section 247, for when the chief executive of the department in which that Act is administered is taken to be the owner of particular rail corridor land or non-rail corridor land under that Act.</txt></block></note></definition><definition id="sch.2-def.PECourt_" guid="_f62df3f4-01b1-4244-b5d4-25b399dc7a16" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.PECourt" guid="_821ec9fc-a263-428e-ae82-4c0680fe749b" type="definition">P&#38;E Court</defterm> means the Planning and Environment Court.</txt></definition><definition id="sch.2-def.PECourtAct_" guid="_b25bb4e9-bd0b-488a-8108-c3ac28298544" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.PECourtAct" guid="_4bdc9d76-29bc-453b-8d66-f50d4cbcac5b" type="definition">P&#38;E Court Act</defterm> means the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Planning and Environment Court Act 2015</name></legref>.</txt></definition><definition id="sch.2-def.participatinglocalgovernment_" guid="_8533ac0b-024b-4c3c-91cf-f8ccec276357" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.participatinglocalgovernment" guid="_e5ee78ef-3265-41c9-b5b6-86e765f7aa5d" type="definition">participating local government</defterm> see the <legref jurisd="QLD" type="act" check="unknown">SEQ Water Act</legref>, section 5(1).</txt></definition><definition id="sch.2-def.party_" guid="_e06a832a-c814-4cb7-98c8-162ddc778fa9" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.party" guid="_c4ee5544-c555-456a-9404-4c4e9d7b1162" type="definition">party</defterm>, in relation to tribunal proceedings or proceedings in the P&#38;E Court, means any or all of the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.party-para1.a" guid="_98f24ef6-5f73-412e-94c5-2c4a7669d494" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the applicant or appellant;</txt></block></li><li id="sch.2-def.party-para1.b" guid="_ef859499-8bab-4b3e-8eab-4c15571731d4" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the respondent;</txt></block></li><li id="sch.2-def.party-para1.c" guid="_fac0af9e-e79f-4a4b-91c9-06a9ef59c82e" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">any co-respondent;</txt></block></li><li id="sch.2-def.party-para1.d" guid="_940a3a22-5b41-4a2b-9311-cc89959accf9" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">if the Minister is represented—the Minister.</txt></block></li></list></definition><definition id="sch.2-def.payer_" guid="_f91bf149-f48c-415c-9f0d-5823c2ca1650" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.payer" guid="_9daae88f-2124-4ea6-bcf5-bf1e6b382019" type="definition">payer</defterm>, for a levied charge or for a payment, means a person who pays all or part of the charge or payment.</txt></definition><definition id="sch.2-def.payment_" guid="_7932dfce-548b-44de-8c54-ef294c77723d" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.payment" guid="_ad6d86c6-b49c-4a95-875e-00d8a891ffae" type="definition">payment</defterm> includes a contribution by way of a payment.</txt></definition><definition id="sch.2-def.person_" guid="_a4c2f3f1-2e03-4ea2-b9be-e4634cd28ede" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.person" guid="_0903ce4a-c8e9-4c7d-85f5-7543805549cc" type="definition">person</defterm> includes a body of persons, whether incorporated or unincorporated.</txt></definition><definition id="sch.2-def.personincontrol_" guid="_c5724cf4-bca6-45f7-99d2-e2737c525ca0" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.personincontrol" guid="_4756eebf-a0ca-483e-a1a2-52de9da19aaa" type="definition">person in control</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.personincontrol-para1.a" guid="_8c84a2f8-3a62-4e08-8795-e11be49144ff" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">of a vehicle, includes—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.personincontrol-para1.a-para2.i" guid="_5912eca5-9e0b-4fe9-8d5c-783c26412e3c" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the vehicle’s driver or rider; and</txt></block></li><li id="sch.2-def.personincontrol-para1.a-para2.ii" guid="_9fae5303-6836-4e43-812c-166c033146f9" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">anyone who reasonably appears to be, claims to be, or acts as if he or she is, the vehicle’s driver or rider or the person in control of the vehicle; or</txt></block></li></list></block></li><li id="sch.2-def.personincontrol-para1.b" guid="_25721cce-0de0-4641-b0d9-02831c8d8b3d" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">of another thing, includes anyone who reasonably appears to be, claims to be, or acts as if he or she is, the person in possession or control of the thing.</txt></block></li></list></definition><definition id="sch.2-def.PIApriorityinfrastructurearea_" guid="_109ecfd2-22d2-4298-960a-a8582086290f" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.PIApriorityinfrastructurearea" guid="_e1697133-fd6a-4c66-8e07-5fe109af7775" type="definition">PIA (priority infrastructure area)</defterm> means an area—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.PIApriorityinfrastructurearea-para1.a" guid="_a4018996-5753-46fa-845b-240ed383ece3" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">serviced, or intended to be serviced, with development infrastructure networks; and</txt></block></li><li id="sch.2-def.PIApriorityinfrastructurearea-para1.b" guid="_9469a81c-2e3b-4240-bce4-d79294b2ef1f" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">used, or approved for use, for—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.PIApriorityinfrastructurearea-para1.b-para2.i" guid="_11151ccc-a839-4736-a023-a2e895aae0eb" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">residential purposes, other than rural residential purposes; or</txt></block></li><li id="sch.2-def.PIApriorityinfrastructurearea-para1.b-para2.ii" guid="_de7b0f02-26f6-4887-8263-ce94ede57f57" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">industrial, retail or commercial purposes; or</txt></block></li><li id="sch.2-def.PIApriorityinfrastructurearea-para1.b-para2.iii" guid="_d5559589-c73f-4434-b073-e7ed06ee544b" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">community or government purposes related to a purpose stated in subparagraph (i) or (ii); and</txt></block></li></list></block></li><li id="sch.2-def.PIApriorityinfrastructurearea-para1.c" guid="_082aed5c-ff88-4255-8ede-26f69c815e98" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">that will accommodate at least 10, but no more than 15, years of growth for any of those purposes.</txt></block></li></list></definition><definition id="sch.2-def.place_" guid="_00b3c092-c591-4a0a-abff-0eb2562618dd" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.place" guid="_04bf9c37-12e4-49af-9847-dadcb43996fd" type="definition">place</defterm> includes—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.place-para1.a" guid="_cfb8f807-d4b5-4e41-84b3-71872e1917d0" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">premises; and</txt></block></li><li id="sch.2-def.place-para1.b" guid="_46372127-e9ce-41dd-84bf-cee7421acc7b" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a place in Queensland waters; and</txt></block></li><li id="sch.2-def.place-para1.c" guid="_aa3631d6-a855-4498-bd2a-bb4827aa31fc" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">a place held—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.place-para1.c-para2.i" guid="_08716a8d-91a5-4283-a45f-d05cb688bb9e" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">by more than 1 owner; or</txt></block></li><li id="sch.2-def.place-para1.c-para2.ii" guid="_428ca117-9bb3-4f6e-9e82-48c321ea7e35" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">under more than 1 title.</txt></block></li></list></block></li></list></definition><definition id="sch.2-def.planning_" guid="_fd20e840-a683-45f7-8b90-890b39fcb3d0" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.planning" guid="_8367a80b-2812-4a65-90ee-db2ff7a60963" type="definition">planning</defterm> see section 3(1).</txt></definition><definition id="sch.2-def.planningchange_" guid="_f7692c2a-c1b9-4335-a304-2913d0d79d1e" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.planningchange" guid="_48e6f1df-3b39-48b5-8ea3-2527882bf9ff" type="definition">planning change</defterm> see section 29(2).</txt></definition><definition id="sch.2-def.planninginstrument_" guid="_217b44b7-294a-4427-95d2-8e55683591a1" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.planninginstrument" guid="_c35b3607-383f-4b77-a1b7-ad2bc02677f4" type="definition">planning instrument</defterm> see section 8(1).</txt></definition><definition id="sch.2-def.planninginstrumentchange_" guid="_2d1b3f80-f751-4f8f-8e22-8953bad93303" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.planninginstrumentchange" guid="_6c7048fa-82c3-49f2-b888-29be9e58485b" type="definition">planning instrument change</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.planninginstrumentchange-para1.a" guid="_54ab1414-9ff8-4a12-b0dc-f839f98cf747" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the commencement of a planning instrument or the amendment of a planning instrument; or</txt></block></li><li id="sch.2-def.planninginstrumentchange-para1.b" guid="_0c70db0d-6e41-47a4-ace0-26ca3893f1e3" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">the start of the application of a planning instrument to premises.</txt></block></li></list></definition><definition id="sch.2-def.planningscheme_" guid="_74a7d3a5-acd9-4fce-9b2e-017c2a17e7b0" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.planningscheme" guid="_c4c38a88-4b2b-4fc6-9d0d-ed83988fff0a" type="definition">planning scheme</defterm> means a planning instrument that sets out the matters stated in section 4(c).</txt></definition><definition id="sch.2-def.planningschemepolicy_" guid="_5375fb02-35d3-4666-8253-d47761fc919e" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.planningschemepolicy" guid="_433f09d5-6e79-4f37-b6d4-f8e59d28debc" type="definition">planning scheme policy</defterm> means a planning instrument that sets out the matters stated in section 4(e).</txt></definition><definition id="sch.2-def.PlumbingandDrainageAct_" guid="_93ffa201-87e4-467e-944a-de6539ab7faf" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.PlumbingandDrainageAct" guid="_3104564c-ff1c-414f-bbc4-3e5664244c89" type="definition">Plumbing and Drainage Act</defterm> means the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Plumbing and Drainage Act 2002</name></legref>.</txt></definition><definition id="sch.2-def.plumbingwork_" guid="_43ae206f-7c2e-4d30-8e8b-64bedeac413e" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.plumbingwork" guid="_98018a0f-3e47-4fa7-8ad6-5f1f7dee53e3" type="definition">plumbing work</defterm> see the <legref jurisd="QLD" type="act" check="unknown">Plumbing and Drainage Act</legref>, schedule.</txt></definition><definition id="sch.2-def.PPI_" guid="_144507a6-d27b-4dda-ba13-253812ea1432" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.PPI" guid="_e60cb1f1-0ceb-4ac9-ad97-65d2b6f99b8d" type="definition">PPI</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.PPI-para1.a" guid="_82fec649-8d8b-46df-866a-5ec1dad06cd2" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the producer price index for construction 6427.0 (ABS PPI) index number 3101—Road and Bridge construction index for Queensland published by the Australian Bureau of Statistics; or</txt></block></li><li id="sch.2-def.PPI-para1.b" guid="_76f40443-38e3-4ce8-97a7-7e8ce95249cb" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if that index stops being published—another similar index prescribed by regulation.</txt></block></li></list></definition><definition id="sch.2-def.preliminaryapproval_" guid="_16f54b79-787d-4626-9660-cbc3b302686a" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.preliminaryapproval" guid="_007bc95f-6111-4170-ada3-93ef0a48c452" type="definition">preliminary approval</defterm> see section 49(2).</txt></definition><definition id="sch.2-def.premises_" guid="_9437aa6f-0f47-462a-9f44-2558457e8118" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.premises" guid="_8a9f8b62-6186-44f3-9ec0-e0c5583afa6e" type="definition">premises</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.premises-para1.a" guid="_791137cf-4b7e-4283-8e3a-71f2c9b16d1d" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a building or other structure; or</txt></block></li><li id="sch.2-def.premises-para1.b" guid="_bb402e75-d65b-449c-9f29-350d9aa5408a" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">land, whether or not a building or other structure is on the land.</txt></block></li></list></definition><definition id="sch.2-def.prerequestresponsenotice_" guid="_939d8c7a-2579-4721-9a78-aae1916dc2a0" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.prerequestresponsenotice" guid="_dd08b76f-c44f-4690-a3fd-221985dfc465" type="definition">pre-request response notice</defterm> see section 80(3).</txt></definition><definition id="sch.2-def.prescribedassessmentmanager_" guid="_1eb5715c-cd23-4743-be61-f5406b7a2ca6" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.prescribedassessmentmanager" guid="_6d2f84d6-ed4d-4371-bc03-f2a48ba6d688" type="definition">prescribed assessment manager</defterm>, for a development application, means an assessment manager prescribed for the application under section 48(2).</txt></definition><definition id="sch.2-def.principalsubmitter_" guid="_261b8283-5739-4626-ba47-b205d4c73583" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.principalsubmitter" guid="_e018f029-f0d0-4df3-ac1f-d5140e80f268" type="definition">principal submitter</defterm>, for a properly made submission, means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.principalsubmitter-para1.a" guid="_d32deadd-4f61-44e3-8431-060c72e35993" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if the submission is by 1 person—the person; or</txt></block></li><li id="sch.2-def.principalsubmitter-para1.b" guid="_64a13414-d92c-48ba-82bc-d96f72d44fff" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">otherwise—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.principalsubmitter-para1.b-para2.i" guid="_89c70836-8989-4d85-ab9c-c84f31e64ca7" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">the submitter that the submission identifies as the principal submitter; or</txt></block></li><li id="sch.2-def.principalsubmitter-para1.b-para2.ii" guid="_018be16b-9d9c-449f-98bc-91020d85f971" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">if the submission does not identify a submitter as the principal submitter—the submitter whose name first appears in the submission.</txt></block></li></list></block></li></list></definition><definition id="sch.2-def.privatecertifier_" guid="_7c6f6515-6fc1-424e-83a0-210b3ee80683" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.privatecertifier" guid="_b950f81d-ed7e-45ae-80b8-5ef8166e2900" type="definition">private certifier</defterm> means a building certifier whose licence under the <legref jurisd="QLD" type="act" check="unknown">Building Act</legref> has private certification endorsement under that Act.</txt></definition><definition id="sch.2-def.prohibiteddevelopment_" guid="_1f0cf176-909e-463b-8bde-a7618c915c8a" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.prohibiteddevelopment" guid="_1c197e2f-f41e-4596-9006-692fbaf88a54" type="definition">prohibited development</defterm> see section 44(2).</txt></definition><definition id="sch.2-def.properlymadeapplication_" guid="_043c9e02-7506-41d7-a299-3e53d8e9a9c7" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.properlymadeapplication" guid="_12d09ab0-a157-4ac5-8570-96b5ccb4c2dc" type="definition">properly made application</defterm> see section 51(5).</txt></definition><definition id="sch.2-def.properlymadesubmission_" guid="_8ad4d3ce-a454-4db6-bd7b-88338c874448" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.properlymadesubmission" guid="_7ab5cbfa-0729-4d39-b90b-ec3465c9e60b" type="definition">properly made submission</defterm> means a submission that—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.properlymadesubmission-para1.a" guid="_0f5f801e-474f-427f-bfd7-8b3895baeb59" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">is signed by each person (the <defterm id="sch.2-def.properlymadesubmission-def.submissionmakers" guid="_b02b55cb-468d-49b2-80ad-7091180baa2a" type="definition">submission-makers</defterm>) who made the submission; and</txt></block></li><li id="sch.2-def.properlymadesubmission-para1.b" guid="_6961856c-9ca3-4e98-ac1b-93a6ab320f72" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">is received—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.properlymadesubmission-para1.b-para2.i" guid="_466b7a36-7c27-4ebd-87f8-e8457ef288e0" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">for a submission about an instrument under section 18, a State planning instrument, or a designation—on or before the last day for making the submission; or</txt></block></li><li id="sch.2-def.properlymadesubmission-para1.b-para2.ii" guid="_1df98bd8-e266-4907-adf8-63fc334f303c" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">otherwise—during the period fixed under this Act for making the submission; and</txt></block></li></list></block></li><li id="sch.2-def.properlymadesubmission-para1.c" guid="_29fd635e-e339-44e3-a59e-fb57f7fdbabe" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">states the name and residential or business address of all submission-makers; and</txt></block></li><li id="sch.2-def.properlymadesubmission-para1.d" guid="_a801e637-97f6-4e41-8bce-095baca4b6e5" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">states its grounds, and the facts and circumstances relied on to support the grounds; and</txt></block></li><li id="sch.2-def.properlymadesubmission-para1.e" guid="_09b9a580-a8a9-4fd3-88dd-03d84e37b889" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">states 1 postal or electronic address for service relating to the submission for all submission-makers; and</txt></block></li><li id="sch.2-def.properlymadesubmission-para1.f" guid="_7d92121b-0973-499a-9efa-87cb271e9657" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">is made to—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.properlymadesubmission-para1.f-para2.i" guid="_3b1b8e39-4203-4f95-b050-f1930c23cfeb" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">for a submission made under chapter 2—the person to whom the submission is required to be made under that chapter; or</txt></block></li><li id="sch.2-def.properlymadesubmission-para1.f-para2.ii" guid="_16568fd0-5a33-4666-9fe5-903dc8ac69b8" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">for a submission about a development application—the assessment manager; or</txt></block></li><li id="sch.2-def.properlymadesubmission-para1.f-para2.iii" guid="_27537973-b1c2-4879-a526-c734d6d8cd05" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">for a submission about a change application—the responsible entity.</txt></block></li></list></block></li></list></definition><definition id="sch.2-def.proposedcallinnotice_" guid="_5cf28d0d-d3c1-4367-8ec7-c836b741a2e6" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.proposedcallinnotice" guid="_3904e47a-ecfa-4390-bb80-a853fed1340f" type="definition">proposed call in notice</defterm> see section 102(2).</txt></definition><definition id="sch.2-def.provision_" guid="_efe84126-13f9-42d3-b90f-9245325ee8da" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.provision" guid="_8f322b19-f29c-445f-9e1e-bf08c8c91837" type="definition">provision</defterm>, of a development approval, means all words or other matters forming, or forming part of, the approval.</txt><note id="sch.2-def.provision-note" guid="_b4ed4bda-26d3-4cbb-8fb2-b5684bad61ae" type="example"><heading id="sch.2-def.provision-note-he" guid="_73f6f83e-2591-44c2-a340-a6b4448dfe4a">Examples—</heading><block status="uncommenced"><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.provision-note-para1" guid="_a8ef0cb4-1778-42f5-90f5-050dd44d8c76" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">a development condition</txt></block></li><li id="sch.2-def.provision-note-para1-oc.2" guid="_c70e03ee-1404-4126-a7ca-5a7544e9ddb0" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">a currency period</txt></block></li><li id="sch.2-def.provision-note-para1-oc.3" guid="_7aa88aee-2a44-46ed-88d2-424a7d162f71" status="uncommenced" provision.type="other"><no>•</no><block status="uncommenced"><txt break.before="1">the identification or inclusion under a variation approval of a matter for the development</txt></block></li></list></block></note></definition><definition id="sch.2-def.publicnotice_" guid="_1e801fed-8e45-4430-9c19-47730c5ecdd3" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.publicnotice" guid="_abfeb555-fedd-4cc3-a6d1-2fc9b0c2ec90" type="definition">public notice</defterm> means a notice that is published—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.publicnotice-para1.a" guid="_e08e3adf-4449-45b5-88e0-3a6ee90c1f34" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for a public notice mentioned in chapter 2, part 2—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.publicnotice-para1.a-para2.i" guid="_ab64f656-c24e-418e-bd80-45d157f26fa0" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">in the gazette; and</txt></block></li><li id="sch.2-def.publicnotice-para1.a-para2.ii" guid="_01f77c5f-2c1a-43cf-be53-fa1c35ba7bb5" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">if the notice is about a State planning instrument or amendment that has, is to have, or had effect in a part of the State only—in a newspaper circulating generally in the part of the State; and</txt></block></li><li id="sch.2-def.publicnotice-para1.a-para2.iii" guid="_04969633-c0c7-4042-a2eb-ff6c1fb0e7ca" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">if the notice is about a State planning instrument that has, is to have, or had effect throughout the State—in a newspaper circulating generally in the State; and</txt></block></li><li id="sch.2-def.publicnotice-para1.a-para2.iv" guid="_e62d3cb8-287c-4f23-8347-5f669a782337" status="uncommenced" provision.type="other"><no>(iv)</no><block status="uncommenced"><txt break.before="1">on the department’s website; or</txt></block></li></list></block></li><li id="sch.2-def.publicnotice-para1.b" guid="_12f9e8be-9230-442f-ac11-50813062467f" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for a public notice mentioned in chapter 2, part 3 that is about a proposed local planning instrument or a proposed amendment of a local planning instrument—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.publicnotice-para1.b-para2.i" guid="_4cb77914-7f9e-417b-a23f-ec1dbf59e619" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">in a newspaper circulating in the local government area; and</txt></block></li><li id="sch.2-def.publicnotice-para1.b-para2.ii" guid="_7b11bd7d-6bf1-46cd-a31e-6fbbaf519bf7" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">on the local government’s website; or</txt></block></li></list></block></li><li id="sch.2-def.publicnotice-para1.c" guid="_48e45381-75d5-41b3-a918-21decebe5eee" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">for a public notice mentioned in chapter 2, part 3 that is about a local planning instrument, or an amendment of a local planning instrument, that is not a proposed local planning instrument or amendment—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.publicnotice-para1.c-para2.i" guid="_6d6efbe4-4831-4108-af39-ecacbe8e8f06" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">in the gazette; and</txt></block></li><li id="sch.2-def.publicnotice-para1.c-para2.ii" guid="_f2d0d917-8997-485d-9541-6fea39ba5acf" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">in a newspaper circulating in the local government area; and</txt></block></li><li id="sch.2-def.publicnotice-para1.c-para2.iii" guid="_889d2651-93fb-4c1b-824f-8bdd7329e2de" status="uncommenced" provision.type="other"><no>(iii)</no><block status="uncommenced"><txt break.before="1">on the local government’s website.</txt></block></li></list></block></li></list></definition><definition id="sch.2-def.publicplace_" guid="_ab5d770c-4407-46a2-bcd7-bcf3b74bd470" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.publicplace" guid="_be0f0d08-2400-4c65-a211-52ee55484164" type="definition">public place </defterm>means a place or part of a place—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.publicplace-para1.a" guid="_9595700d-57b9-4881-b8cc-9abfaa20ce20" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">that the public is entitled to use, is open to members of the public or is used by the public, whether or not on payment of money (a beach, park or road, for example); or</txt></block></li><li id="sch.2-def.publicplace-para1.b" guid="_a21f03a7-c59e-4889-8e1d-ef0c3549cc06" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the occupier of the place allows members of the public to enter the place, whether or not on payment of money (a sale yard or showground, for example).</txt></block></li></list></definition><definition id="sch.2-def.publicpurposechange_" guid="_02415180-98ee-4274-a2b0-8ee6c9fb6548" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.publicpurposechange" guid="_140e0157-a63a-4124-a5ae-5a93872b72c3" type="definition">public purpose change</defterm> see section 30(3).</txt></definition><definition id="sch.2-def.publicsectorentity_" guid="_fa9d212a-f5e5-44fa-8d31-55ab20d72a85" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.publicsectorentity" guid="_2c1be14f-7803-4bb5-b37a-b9a6f663abc4" type="definition">public sector entity</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.publicsectorentity-para1.a" guid="_5c4a832f-6e59-4b03-be40-f9e0f1e8c16e" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">a department or part of a department; or</txt></block></li><li id="sch.2-def.publicsectorentity-para1.b" guid="_f055acc7-e647-4227-bf7c-c4f1e8c5b231" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">other than in chapter 4—a distributor-retailer; or</txt></block></li><li id="sch.2-def.publicsectorentity-para1.c" guid="_86a0eda3-6c14-47d1-a4f7-d61e64036f8a" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">an agency, authority, commission, committee, corporation (including a government owned corporation), instrumentality, office, or other entity, established under an Act for a public or State purpose.</txt><note id="sch.2-def.publicsectorentity-para1.c-note" guid="_3d8be5b6-8cde-4477-bc53-20699ad8d0e3" type="example"><heading id="sch.2-def.publicsectorentity-para1.c-note-he" guid="_14231957-1433-4573-8d68-33ef74addd94">Examples for paragraph (c)—</heading><block status="uncommenced"><txt break.before="1">a local government, a government owned corporation or a rail government entity under the Transport Infrastructure Act</txt></block></note></block></li></list></definition><definition id="sch.2-def.qualificationsorexperience_" guid="_19409006-8bac-4cf3-be03-703f5cc2ef5d" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.qualificationsorexperience" guid="_b4a6a730-fe4f-4dfc-9429-48027a506689" type="definition">qualifications or experience</defterm> includes qualifications and experience.</txt></definition><definition id="sch.2-def.Queenslandheritageplace_" guid="_b87c2caf-3b05-4905-b5ab-61117ebe303f" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.Queenslandheritageplace" guid="_6cd7ddad-5419-48e1-aff9-88b01d021c14" type="definition">Queensland heritage place</defterm> see the <legref jurisd="QLD" type="act" check="unknown">Heritage Act</legref>, schedule.</txt></definition><definition id="sch.2-def.rates_" guid="_7f878e17-5013-4ef6-97c2-3d2ccf56fdaf" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.rates" guid="_9d0f22d5-1c72-40c7-a813-71e8ead9f25b" type="definition">rates</defterm> means rates within the meaning of the <legref jurisd="QLD" type="act" check="unknown">City of Brisbane Act</legref> or the <legref jurisd="QLD" type="act" check="unknown">Local Government Act</legref>.</txt></definition><definition id="sch.2-def.reasonablybelieves_" guid="_21644a10-57e6-4e78-b28b-2968b6175d55" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.reasonablybelieves" guid="_7321dc70-f13c-4a05-b4d1-39869b796636" type="definition">reasonably believes</defterm> means believes on grounds that are reasonable in the circumstances.</txt></definition><definition id="sch.2-def.reasonablysuspects_" guid="_7c8005d0-df90-48c2-bd82-68ace1285771" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.reasonablysuspects" guid="_74a776e3-1ba2-4110-ae46-7a215271f1fa" type="definition">reasonably suspects</defterm> means suspects on grounds that are reasonable in the circumstances.</txt></definition><definition id="sch.2-def.recipient_" guid="_a8b923b9-1e21-4af4-bdb7-a9d7c25fe1f2" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.recipient" guid="_6b550441-5ee9-4408-b99a-ca53262729eb" type="definition">recipient</defterm>, for a direction, notice or order, means a person who is given the direction, notice or order.</txt></definition><definition id="sch.2-def.reconfiguringalot_" guid="_bc3672cd-40df-4717-9b24-c3dbc60a0854" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.reconfiguringalot" guid="_56f42d0c-468a-4f96-9378-2d09742b5c75" type="definition">reconfiguring a lot</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.reconfiguringalot-para1.a" guid="_ce07de0e-f17f-4c77-96c2-7108ff6c6e6e" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">creating lots by subdividing another lot; or</txt></block></li><li id="sch.2-def.reconfiguringalot-para1.b" guid="_4498c72a-1136-47dd-966a-d9a5c6b91632" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">amalgamating 2 or more lots; or</txt></block></li><li id="sch.2-def.reconfiguringalot-para1.c" guid="_7f0311a2-6ceb-4b61-a956-0b9c531cc0e8" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">rearranging the boundaries of a lot by registering a plan of subdivision under the <legref jurisd="QLD" type="act" check="unknown">Land Act</legref> or <legref jurisd="QLD" type="act" check="unknown">Land Title Act</legref>; or</txt></block></li><li id="sch.2-def.reconfiguringalot-para1.d" guid="_4c78be89-3d98-409c-8f09-20403b52244a" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">dividing land into parts by agreement rendering different parts of a lot immediately available for separate disposition or separate occupation, other than by an agreement that is—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.reconfiguringalot-para1.d-para2.i" guid="_dacdc69e-0322-4dce-a8b9-763273816321" status="uncommenced" provision.type="other"><no>(i)</no><block status="uncommenced"><txt break.before="1">a lease for a term, including renewal options, not exceeding 10 years; or</txt></block></li><li id="sch.2-def.reconfiguringalot-para1.d-para2.ii" guid="_37b48ad7-349a-4217-821f-b5efe4734ee0" status="uncommenced" provision.type="other"><no>(ii)</no><block status="uncommenced"><txt break.before="1">an agreement for the exclusive use of part of the common property for a community titles scheme under the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Body Corporate and Community Management Act 1997</name></legref>; or</txt></block></li></list></block></li><li id="sch.2-def.reconfiguringalot-para1.e" guid="_c6c46040-edc8-4d4f-ab38-740daf7d83da" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">creating an easement giving access to a lot from a constructed road.</txt></block></li></list></definition><definition id="sch.2-def.referee_" guid="_b95f4ae2-bec2-4bf8-9c34-cf87a698455a" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.referee" guid="_302798ea-5abb-4f97-b1c0-434fd61d920d" type="definition">referee</defterm> means a referee who holds an appointment under section 233(1) or (2).</txt></definition><definition id="sch.2-def.referralagency_" guid="_aba3c7ff-deb0-4019-b2d2-03419120d480" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.referralagency" guid="_377a51fe-a504-486b-9560-a43a5bb93cc0" type="definition">referral agency</defterm> see section 54(2).</txt></definition><definition id="sch.2-def.referralagencysresponse_" guid="_83ede716-59d6-484e-b0ee-f7246acd2066" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.referralagencysresponse" guid="_2f7210cc-701b-4df3-baa2-49a62d6bafdb" type="definition">referral agency’s response</defterm> see section 56(4).</txt></definition><definition id="sch.2-def.region_" guid="_37a91be8-1c30-442a-8b7d-1d374323ad6d" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.region" guid="_a462a348-30e9-4c6d-95f8-d0383bbb7180" type="definition">region</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.region-para1.a" guid="_b96fc952-0690-4ea8-bb1b-adf2c26d98ca" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the local government areas, or parts of local government areas, prescribed by regulation as a region; and</txt></block></li><li id="sch.2-def.region-para1.b" guid="_09bfb5d0-6723-42f0-a38e-c555cd74fa90" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">Queensland waters next to the local government areas or parts of local government areas.</txt></block></li></list></definition><definition id="sch.2-def.regionalplan_" guid="_5d5f5b6e-240a-4208-a4e8-8d76f2cfd65b" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.regionalplan" guid="_fa42230d-588f-4068-a75c-8d39edb8fd7e" type="definition">regional plan</defterm> means a planning instrument that sets out the matters stated in section 4(b).</txt></definition><definition id="sch.2-def.registeredpremises_" guid="_65f6e81e-1c1c-4cd4-88da-bc5bcdbfcdd0" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.registeredpremises" guid="_0c750962-32d9-48ca-a011-65d8e3b11d74" type="definition">registered premises</defterm> means premises registered under section 267.</txt></definition><definition id="sch.2-def.registrar_" guid="_98857d74-a1a8-40b5-bacf-635f69086a15" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.registrar" guid="_af215c14-4a8a-40ca-93f1-101b1da6eb4b" type="definition">registrar</defterm> means the person who holds an appointment under section 238(1)(a).</txt></definition><definition id="sch.2-def.registraroftitles_" guid="_6a61bbef-1ebc-407f-91d3-7b38e579a4e6" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.registraroftitles" guid="_57348902-66ba-4591-93c2-5c3539b5d84d" type="definition">registrar of titles</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.registraroftitles-para1.a" guid="_2fe005a5-1ee1-4347-9908-0f63274981ac" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the registrar of titles under the <legref jurisd="QLD" type="act" check="unknown">Land Title Act</legref>; or</txt></block></li><li id="sch.2-def.registraroftitles-para1.b" guid="_befc88c4-5284-4de9-b39f-75f49c14a984" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">another person who is responsible for keeping, under another Act, a register of interests in land.</txt></block></li></list></definition><definition id="sch.2-def.regulatedrequirements_" guid="_2d2186ac-19a0-4be9-bfbd-e5dfdc2e1ea2" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.regulatedrequirements" guid="_5095fca3-19b7-411b-bd8c-555ca211d9e7" type="definition">regulated requirements</defterm> see section 16(2).</txt></definition><definition id="sch.2-def.repealedLGPEAct_" guid="_2d412df5-7460-45aa-a2c3-9b44ad20b9b3" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.repealedLGPEAct" guid="_72d3c689-1461-4ec3-b7c0-027ca41218f5" type="definition">repealed LGP&#38;E Act</defterm> means the repealed <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Local Government (Planning and Environment) Act 1990</name></legref>.</txt></definition><definition id="sch.2-def.representation_" guid="_93f83121-886f-43fa-b689-a1f721f816fa" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.representation" guid="_072fe2cc-8b39-4d7b-bd17-143a2394a9e0" type="definition">representation</defterm> means written representation.</txt></definition><definition id="sch.2-def.representationperiod_" guid="_92706c2a-d951-4b94-a897-171976ca309a" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.representationperiod" guid="_dec471a5-6fff-4ad3-a30e-f20fe4e70da1" type="definition">representation period</defterm> see section 102(3)(d).</txt></definition><definition id="sch.2-def.requiredfee_" guid="_0442987d-eeac-4a1c-87a9-4c5bf055f188" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.requiredfee" guid="_a7f146cc-24b1-4af6-904b-814e6d317470" type="definition">required fee</defterm>, for an application or referral to, or appeal to, a person means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.requiredfee-para1.a" guid="_ac10be3d-f139-494c-bd5c-affecf98378c" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">if the person is a local government—the fee, if any, the local government has fixed by resolution; or</txt></block></li><li id="sch.2-def.requiredfee-para1.b" guid="_80335d95-4c97-4f11-979b-ea72247a5a68" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">if the person is a public sector entity or the Minister—the fee, if any, prescribed by regulation; or</txt></block></li><li id="sch.2-def.requiredfee-para1.c" guid="_06e6ce41-118c-4638-9e21-74c2e8e3606d" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">if the person is a chosen assessment manager—the fee negotiated between the applicant and the person.</txt></block></li></list></definition><definition id="sch.2-def.responsenotice_" guid="_8e0ab4d0-3abe-44c3-956c-99629bfe245f" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.responsenotice" guid="_f1bab486-89cf-4002-94ee-c85f558c2891" type="definition">response notice</defterm>, for a change application, see section 80(5).</txt></definition><definition id="sch.2-def.responsibleentity_" guid="_94d93c8d-42a2-4693-9bbb-b303a01b2273" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.responsibleentity" guid="_5ced1280-6648-4f96-bff5-43130b2d2c75" type="definition">responsible entity</defterm>, for a change application, see section 78(3).</txt></definition><definition id="sch.2-def.road_" guid="_e5cf313a-09fe-45cb-b7df-44882fc0547e" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.road" guid="_077dd3b8-e1c4-4503-9df9-b3f578a5743c" type="definition">road</defterm> has the meaning given in the Transport Infrastructure Act, schedule 6, definition road, paragraphs (c) and (d).</txt></definition><definition id="sch.2-def.SARA_" guid="_9989874f-313e-41a1-81fb-72a45b4f3291" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.SARA" guid="_c6dfdcfb-b4b3-4521-8cc0-ada463bfbc26" type="definition">SARA</defterm> means that part of the department known as the State Assessment and Referral Agency.</txt></definition><definition id="sch.2-def.SEQWaterAct_" guid="_d87dd2c2-4cad-400f-90cb-74d862a8633f" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.SEQWaterAct" guid="_d89ce458-de59-485b-bf04-53eb5191996f" type="definition">SEQ Water Act</defterm> means the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">South-East Queensland Water (Distribution and Retail Restructuring) Act 2009</name></legref>.</txt></definition><definition id="sch.2-def.showcausenotice_" guid="_b3d0c368-bb74-4e85-abc2-349e84adcacf" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.showcausenotice" guid="_d2513210-60aa-4332-b2a5-17f2d6e3df43" type="definition">show cause notice</defterm> see section 167(2).</txt></definition><definition id="sch.2-def.standardconditions_" guid="_e523b69e-295e-46c6-a28e-df6bbb55cc6e" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.standardconditions" guid="_866580b7-82ae-438d-9379-21c04ad5b610" type="definition">standard conditions</defterm> means the conditions—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.standardconditions-para1.a" guid="_dfdddcfb-1440-491a-98a2-57bc75dc969c" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">taken to be imposed on a deemed approval under section 64(8)(c) if the assessment manager does not give a decision notice in relation to the approval; and</txt></block></li><li id="sch.2-def.standardconditions-para1.b" guid="_58ff81bb-5cba-4083-a350-0746372ecc2d" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">stated in the development assessment rules.</txt></block></li></list></definition><definition id="sch.2-def.Statecontrolledroad_" guid="_009605e5-314d-4814-bc86-02a458a6d532" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.Statecontrolledroad" guid="_f43bc95a-0952-4e92-af88-a98fca1c13f9" type="definition">State-controlled road</defterm> see the <legref jurisd="QLD" type="act" check="unknown">Transport Infrastructure Act</legref>, schedule 6.</txt></definition><definition id="sch.2-def.StateDevelopmentAct_" guid="_ad1e095e-f32b-4879-b317-8e1c9dee89a6" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.StateDevelopmentAct" guid="_86de2913-399a-44d9-b704-181cabebee6a" type="definition">State Development Act</defterm> means the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">State Development and Public Works Organisation Act 1971</name></legref>.</txt></definition><definition id="sch.2-def.Stateheritageplace_" guid="_8ab31726-978e-43ce-ac71-cd16df840b3d" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.Stateheritageplace" guid="_67627c4c-fca3-4f51-85f4-ef17849e8f65" type="definition">State heritage place</defterm> see the Heritage Act, schedule.</txt></definition><definition id="sch.2-def.Stateinfrastructure_" guid="_a4cfd55a-75e1-42f9-b2b4-1df8282f756e" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.Stateinfrastructure" guid="_5adc57d8-5364-4fcc-8626-33a6be06052d" type="definition">State infrastructure</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.Stateinfrastructure-para1.a" guid="_63728c35-a810-4f37-a0d1-6c1c02818af5" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">State schools infrastructure; or</txt></block></li><li id="sch.2-def.Stateinfrastructure-para1.b" guid="_02103bf8-147f-4654-9065-be4363a39517" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">public transport infrastructure; or</txt></block></li><li id="sch.2-def.Stateinfrastructure-para1.c" guid="_9c320470-ed43-4e2a-8c51-075f0de5f7c5" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">State-controlled roads infrastructure; or</txt></block></li><li id="sch.2-def.Stateinfrastructure-para1.d" guid="_511c8640-933d-4435-ae5b-30eed41b1ffe" status="uncommenced" provision.type="other"><no>(d)</no><block status="uncommenced"><txt break.before="1">emergency services infrastructure; or</txt></block></li><li id="sch.2-def.Stateinfrastructure-para1.e" guid="_31a48a93-20c9-4def-90b5-acd80377c92e" status="uncommenced" provision.type="other"><no>(e)</no><block status="uncommenced"><txt break.before="1">health infrastructure, including hospitals and associated institutions infrastructure; or</txt></block></li><li id="sch.2-def.Stateinfrastructure-para1.f" guid="_db073e4f-39c0-415b-bb6b-2f56d782b81e" status="uncommenced" provision.type="other"><no>(f)</no><block status="uncommenced"><txt break.before="1">freight rail infrastructure; or</txt></block></li><li id="sch.2-def.Stateinfrastructure-para1.g" guid="_d61cc849-67f9-459b-82fc-02e9bda46934" status="uncommenced" provision.type="other"><no>(g)</no><block status="uncommenced"><txt break.before="1">State urban and rural residential water cycle management infrastructure, including infrastructure for water supply, sewerage, collecting water, treating water, stream managing, disposing of water and flood mitigation; or</txt></block></li><li id="sch.2-def.Stateinfrastructure-para1.h" guid="_9ecdd4d9-1f2d-4ebd-9cf5-997dd26c65bb" status="uncommenced" provision.type="other"><no>(h)</no><block status="uncommenced"><txt break.before="1">justice administration facilities, including court or police facilities.</txt></block></li></list></definition><definition id="sch.2-def.Stateinfrastructureprovider_" guid="_882b41d3-8a42-4cac-8043-7783c1a0dcee" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.Stateinfrastructureprovider" guid="_33267510-b3cc-4cdd-811e-9b606074e050" type="definition">State infrastructure provider</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.Stateinfrastructureprovider-para1.a" guid="_d925e611-adfc-454f-ba42-a6b77504a07a" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">the chief executive; or</txt></block></li><li id="sch.2-def.Stateinfrastructureprovider-para1.b" guid="_aa6e4973-1d79-41e8-9043-1f14806bc100" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">a public sector entity, other than a local government, that provides State infrastructure.</txt></block></li></list></definition><definition id="sch.2-def.Stateinterest_" guid="_9aec0a6f-da3f-4f01-a12e-7018caa453cb" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.Stateinterest" guid="_d7c37a99-2c54-4ecc-adba-0f4413fdee8c" type="definition">State interest</defterm> means an interest that the Minister considers—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.Stateinterest-para1.a" guid="_b2a9fc0d-adc6-49d0-9f6d-51a6d584e1c5" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">affects an economic or environmental interest of the State or a part of the State; or</txt></block></li><li id="sch.2-def.Stateinterest-para1.b" guid="_268149d6-3ef2-4b85-bf03-9a9117e6e654" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">affects the interest of ensuring this Act’s purpose is achieved.</txt></block></li></list></definition><definition id="sch.2-def.StateownedorStatecontrolledtransportinfrastructure_" guid="_bd246007-108d-451c-9a1a-db1515592020" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.StateownedorStatecontrolledtransportinfrastructure" guid="_6734b79c-6525-4de6-8425-c6df39674057" type="definition">State-owned or State-controlled transport infrastructure</defterm> means transport infrastructure under the <legref jurisd="QLD" type="act" check="unknown">Transport Infrastructure Act</legref> that the State owns or controls.</txt></definition><definition id="sch.2-def.Stateplanninginstrument_" guid="_10b3a041-4c1f-4d9e-89b2-1f50bfd4fefd" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.Stateplanninginstrument" guid="_e720dfc2-e3c5-4825-815d-540681814dee" type="definition">State planning instrument</defterm> see section 8(2).</txt></definition><definition id="sch.2-def.Stateplanningpolicy_" guid="_9fe7785f-a824-4e59-b581-0cef9de5f280" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.Stateplanningpolicy" guid="_9aaf0cc2-c24d-47e8-b20e-7ce0cfbe94f2" type="definition">State planning policy</defterm> means a planning instrument that sets out the matters stated in section 4(a).</txt></definition><definition id="sch.2-def.Staterelatedcondition_" guid="_0871f490-7e83-47ef-a58a-c468b7c26971" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.Staterelatedcondition" guid="_fa991ab8-91af-465f-8c98-b8963122fc7d" type="definition">State-related condition</defterm> see section 146(1).</txt></definition><definition id="sch.2-def.storey_" guid="_b3fe3665-3cb1-4be9-8873-ca4bfcde144b" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.storey" guid="_2092530d-4569-4a92-8c65-b9eea9fdf4ee" type="definition">storey</defterm> see the Building Code, part A1.1.</txt></definition><definition id="sch.2-def.subjectpremises_" guid="_75fd14fa-9523-482e-ab8a-d34725921df6" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.subjectpremises" guid="_d6310f74-f215-4c0d-9c4e-87bd481e6b0c" type="definition">subject premises</defterm> see section 127(1).</txt></definition><definition id="sch.2-def.submission_" guid="_7374aedc-cc8e-45a6-83d8-38aac5b66e9c" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.submission" guid="_8d5df552-7632-425c-bbdb-0d356f21ec76" type="definition">submission</defterm> means a written submission.</txt></definition><definition id="sch.2-def.submitter_" guid="_56822d5b-891f-4ec2-acd3-14056261cdeb" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.submitter" guid="_9ac625b3-031d-48d5-8e42-a4bfff49fb3f" type="definition">submitter</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.submitter-para1.a" guid="_0e982add-b47d-4aed-8024-2b629350e39f" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">for a development application or change application—a person who makes a properly made submission about the application; or</txt></block></li><li id="sch.2-def.submitter-para1.b" guid="_a6c25c87-2632-4dc6-a241-5c0a204c708b" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">for a particular submission—the person who made the submission.</txt></block></li></list></definition><definition id="sch.2-def.supersededplanningscheme_" guid="_1fca01ea-f645-4cb0-b363-b492e4d1218e" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.supersededplanningscheme" guid="_af609bf5-0f6c-4af2-91ec-fa362785fea3" type="definition">superseded planning scheme</defterm> see section 29(2).</txt></definition><definition id="sch.2-def.supersededplanningschemeapplication_" guid="_016c6e97-7b64-48eb-a7b0-93523ba28e73" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.supersededplanningschemeapplication" guid="_4d664f76-e523-4ff9-8756-8eb2ef2c4f55" type="definition">superseded planning scheme application</defterm> see section 29(4)(a).</txt></definition><definition id="sch.2-def.supersededplanningschemerequest_" guid="_11691f02-ba23-41a5-b290-e4ae8f4b6a0e" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.supersededplanningschemerequest" guid="_ef26a6f9-13cd-4588-891e-613d3c0cbaa0" type="definition">superseded planning scheme request</defterm> see section 29(4).</txt></definition><definition id="sch.2-def.temporaryStateplanningpolicy_" guid="_6657188b-3c84-4394-94f9-ffd26e16c940" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.temporaryStateplanningpolicy" guid="_cd77028d-e4f7-433c-a7c4-2af87499ef09" type="definition">temporary State planning policy</defterm> see section 12(2).</txt></definition><definition id="sch.2-def.tidalworks_" guid="_9cb347a4-82dc-497c-a47a-47381e5a7c35" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.tidalworks" guid="_7cb47996-06a9-4979-8247-02dd6c81bd7a" type="definition">tidal works</defterm> see the <legref jurisd="QLD" type="act" check="unknown">Coastal Act</legref>, schedule.</txt></definition><definition id="sch.2-def.TLPItemporarylocalplanninginstrument_" guid="_bf8a605b-b570-48d1-9857-cf4c425e62e3" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.TLPItemporarylocalplanninginstrument" guid="_ba99a63e-17c8-4afd-8025-62c90945b029" type="definition">TLPI (temporary local planning instrument)</defterm> means a planning instrument that sets out the matters stated in section 4(d).</txt></definition><definition id="sch.2-def.TransportInfrastructureAct_" guid="_1e32558e-e7d6-4667-bf7f-7f0b197d2648" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.TransportInfrastructureAct" guid="_0eb59058-588c-4f51-a977-03402615bcd4" type="definition">Transport Infrastructure Act</defterm> means the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Transport Infrastructure Act 1994</name></legref>.</txt></definition><definition id="sch.2-def.tribunal_" guid="_50674669-0590-47ba-a61b-8372904127d9" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.tribunal" guid="_c34dc226-7716-4bf2-97ba-e803700cae7e" type="definition">tribunal</defterm> means a development tribunal.</txt></definition><definition id="sch.2-def.tribunalproceedings_" guid="_c290f1a8-a555-4686-9fac-c8c210f9414d" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.tribunalproceedings" guid="_e86744b9-e812-47fc-8583-4527154d20b9" type="definition">tribunal proceedings</defterm> means proceedings in a tribunal to hear an appeal or an application for a declaration.</txt></definition><definition id="sch.2-def.trunkinfrastructure_" guid="_0ab52ce7-ec20-4d8c-9a75-bb47308a4422" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.trunkinfrastructure" guid="_e9134af7-9751-4a5b-9343-fc004cc440ab" type="definition">trunk infrastructure</defterm>, for a local government, means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sch.2-def.trunkinfrastructure-para1.a" guid="_7d4cf4f9-a1ee-460f-9d9b-8568f4326fff" status="uncommenced" provision.type="other"><no>(a)</no><block status="uncommenced"><txt break.before="1">development infrastructure identified in a LGIP as trunk infrastructure; or</txt></block></li><li id="sch.2-def.trunkinfrastructure-para1.b" guid="_6010ae8b-cc5b-4b2d-ba0d-81016b30c360" status="uncommenced" provision.type="other"><no>(b)</no><block status="uncommenced"><txt break.before="1">development infrastructure that, because of a conversion application, becomes trunk infrastructure; or</txt></block></li><li id="sch.2-def.trunkinfrastructure-para1.c" guid="_a6ccd42e-d955-4a30-94c8-ac085e4b928a" status="uncommenced" provision.type="other"><no>(c)</no><block status="uncommenced"><txt break.before="1">development infrastructure that is required to be provided under a condition under section 128(3).</txt></block></li></list></definition><definition id="sch.2-def.use_" guid="_dcce7b9a-fd1c-4a64-b4ac-05d21a53a8ce" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.use" guid="_ec3c3570-5f36-46df-9825-9d36f46a7881" type="definition">use</defterm>, for premises, includes an ancillary use of the premises.</txt></definition><definition id="sch.2-def.variationapproval_" guid="_ef16df3d-25e3-4320-b06a-9e15eccc1e4e" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.variationapproval" guid="_926e36e6-537a-4d9f-b5dc-605398600726" type="definition">variation approval</defterm> means the part of a preliminary approval for premises that varies the effect of any local planning instrument in effect for the premises.</txt></definition><definition id="sch.2-def.variationrequest_" guid="_2eeb72b2-d9c2-4481-a63d-0af6f1b3e88c" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.variationrequest" guid="_110c64ef-4f95-44d0-91e7-5cf5830ca270" type="definition">variation request</defterm> means part of a development application for a preliminary approval for premises that seeks to vary the effect of any local planning instrument in effect for the premises.</txt></definition><definition id="sch.2-def.vehicle_" guid="_10bd3bec-c5ce-4668-9ffb-ff8c18ebe629" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.vehicle" guid="_46fe3c02-1f45-4a7b-adfa-022f828c3d07" type="definition">vehicle</defterm> means a vehicle or vessel under the <legref jurisd="QLD" type="act" check="unknown"><name emphasis="yes">Transport Operations (Road Use Management) Act 1995</name></legref>.</txt></definition><definition id="sch.2-def.waterinfrastructure_" guid="_47b1394c-5ba9-4c07-840f-a1f69bb8c046" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.waterinfrastructure" guid="_f0ebd5d0-8f37-4394-8306-377713bfdd26" type="definition">water infrastructure</defterm> see the <legref jurisd="QLD" type="act" check="unknown">SEQ Water Act</legref>, section 53BB(1).</txt></definition><definition id="sch.2-def.works_" guid="_59b7145b-ffd3-471c-9d0b-8af46c248a3d" status="uncommenced" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sch.2-def.works" guid="_7bc51401-54ce-4221-bc81-92db361e5992" type="definition">works</defterm> includes building work, operational work, plumbing work and drainage work.</txt></definition></deflist></block></schedule></schedules></act>