<?xml version="1.0" encoding="utf-8"?>
<!--************************************************************************************************************-->
<!--                                              DISCLAIMER                                                    -->
<!---->
<!--Queensland does not accept responsibility for the accuracy or completeness of material on this website      -->
<!--(or any other website referred to on this website) except as set out below. Users should exercise their     -->
<!--own skill and care in the use of the material.                                                              -->
<!---->
<!--No warranty is given that the material located on this site, or on any other site referred to on this site, -->
<!--is free from error or omission. Users should exercise their own skill and care with respect to the use of   -->
<!--the material. Accordingly, the State of Queensland and its servants and agents expressly disclaim liability -->
<!--for any act done or omission made in reliance on any such material and any consequences of any such act or  -->
<!--omission. This notice must not be erased.                                                                   -->
<!---->
<!--************************************************************************************************************-->
<act title="Waste Reduction and Recycling (Waste Levy) Amendment Bill 2019" bill.title="Waste Reduction and Recycling (Waste Levy) Amendment Bill 2019" year.introduced="2018" no="72" publication.date="2019-02-19" type="bill" amending="pure" bill.no="72" bill.type="government" act.type="publicgeneral" print.type="bill.third" introduction.date="2018-09-06" parliament.no="56" la.third.reading.date="2019-02-14T00:00:00+10:00" id="bill-2018-072" version.desc.id="a4cea088-49fa-41d5-a8f3-59d61d7bb407" version.series.id="f39804ab-11aa-4a41-a37e-6bb873c22a83"><wrapper><front id="frnt" guid="_1ad54fc9-9105-4350-92f6-464edfb8369c"><longtitle id="frnt-lt" guid="_c406e461-1297-4c28-9f4b-eb3e06cdd7ae"><block><txt break.before="1">An Act to amend the <legref jurisd="QLD" type="act" target.doc.id="act-2011-031" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid"><name emphasis="yes">Waste Reduction and Recycling Act 2011</name></legref> for particular purposes</txt></block></longtitle><enact id="frnt-enact" guid="_fafcbe33-5337-4c0b-bbc3-dfe4530a4aed"><block><txt break.before="1">The Parliament of Queensland enacts—</txt></block></enact></front><body numbering.style="manual"><part id="pt.1" guid="_88e20c8a-45ea-4432-b2dc-a0bce081a971" affected.by.uncommenced="0"><no>Part 1</no><heading id="pt.1-he" guid="_3801d085-72ab-41ab-922a-e4efa89764a0">Preliminary</heading><clause id="sec.1" guid="_13cee4e8-7d6f-4a24-8db1-b98fccbbe0c3" affected.by.uncommenced="0" spent.amends="0" provision.type="shorttitle"><no>1</no><heading id="sec.1-he" guid="_b70d5d89-136e-49e1-9906-8eb07f27b956">Short title</heading><block><txt break.before="1">This Act may be cited as the <legref jurisd="QLD" type="act" check="invalid"><name emphasis="yes">Waste Reduction and Recycling (Waste Levy) Amendment Act 2019</name></legref>.</txt></block></clause><clause id="sec.2" guid="_7ee08d27-1427-451c-9f00-37db797bf256" affected.by.uncommenced="0" spent.amends="0" provision.type="commence"><no>2</no><heading id="sec.2-he" guid="_39e62a0c-e83b-482f-a579-f1078f96196e">Commencement</heading><subclause id="sec.2-ssec.1" guid="_dfbe2f9a-642f-4dfb-b6d7-3742e1288517" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The following provisions commence on 1 June 2019—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.2-ssec.1-para1" guid="_8eb259d8-cac0-4e1e-9acd-c51316d2be8a" provision.type="other"><no>•</no><block><txt break.before="0"><intref refid="sec.3" check="valid" target.guid="_885e0f8b-ed36-40e1-93b5-f8590eac8882">section&#160;3</intref></txt></block></li><li id="sec.2-ssec.1-para1-oc.2" guid="_5bdef34a-6556-4f69-a2e8-232f59efa37e" provision.type="other"><no>•</no><block><txt break.before="0"><intref refid="sec.19" check="valid" target.guid="_bc7333ad-a00a-41e6-a213-ef2e5e62581f">section&#160;19</intref>, to the extent it inserts new <intref refid="ch.16" check="invalid">chapter&#160;16</intref>, <intref refid="ch.16-pt.3" check="invalid">part&#160;3</intref> heading and <intref refid="sec.323" check="invalid">sections&#160;323</intref> and <intref refid="sec.324" check="invalid">324</intref>.</txt></block></li></list></block></subclause><subclause id="sec.2-ssec.2" guid="_471b697a-a369-4fae-bd1a-9eebd373b05a" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0"><intref refid="pt.2" check="valid" target.guid="_81217d92-7475-48cf-9140-12a08e5c3b42">Part&#160;2</intref>, other than the provisions commenced under <intref refid="sec.2-ssec.1" check="valid" target.guid="_dfbe2f9a-642f-4dfb-b6d7-3742e1288517">subsection&#160;(1)</intref>, commences on 1 July 2019.</txt></block></subclause></clause></part><part id="pt.2" guid="_81217d92-7475-48cf-9140-12a08e5c3b42" affected.by.uncommenced="0"><no>Part 2</no><heading id="pt.2-he" guid="_a065d126-d62e-406e-9d64-d96f112177f4">Amendment of Waste Reduction and Recycling Act 2011</heading><clause id="sec.3" guid="_885e0f8b-ed36-40e1-93b5-f8590eac8882" affected.by.uncommenced="0" spent.amends="0" provision.type="amend"><no>3</no><heading id="sec.3-he" guid="_1572f88b-2cdb-489f-8173-85cc7ad89d33">Act amended</heading><block><txt break.before="1">This part amends the <legref jurisd="QLD" type="act" target.doc.id="act-2011-031" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid"><name emphasis="yes">Waste Reduction and Recycling Act 2011</name></legref>.</txt></block></clause><clause id="sec.4" guid="_737c4580-1e54-4bd1-b25f-dab16e6370f6" affected.by.uncommenced="0" spent.amends="0" provision.type="amend"><no>4</no><heading id="sec.4-he" guid="_0a2ea247-c027-4fe2-a5ab-fec134030861">Amendment of <legref target.doc.id="act-2011-031" refid="sec.5" target.guid="_c37f2785-7462-40d6-ac86-33d43df0e26a" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">s&#160;5</legref> (Approach to achieving Act’s objects)</heading><subclause id="sec.4-ssec.1" guid="_57a8f8e3-758a-4b78-a526-7c4d09601e5f" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0"><legref target.doc.id="act-2011-031" refid="sec.5" target.guid="_c37f2785-7462-40d6-ac86-33d43df0e26a" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">Section&#160;5</legref>—</txt><txt break.before="1"><i>insert—</i></txt><fragment format="fromcontext" auto.number.type="manual" style="indent"><block><list number.type="manual" unnumbered.indent="0"><li id="sec.4-ssec.1-frag-para1.ba" guid="_6fa940cd-3425-43f7-9531-0035f885d8cd" provision.type="other"><no>(ba)</no><block><txt break.before="0">price signalling, including through the introduction of a levy on waste delivered to a levyable waste disposal site;</txt></block></li></list></block></fragment></block></subclause><subclause id="sec.4-ssec.2" guid="_2427dd83-db8b-4aea-8937-c62d53a79dc8" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0"><legref target.doc.id="act-2011-031" refid="sec.5" target.guid="_c37f2785-7462-40d6-ac86-33d43df0e26a" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">Section&#160;5</legref><legref target.doc.id="act-2011-031" refid="sec.5-para1.l" target.guid="_4d1b482b-af4b-46f2-bf58-efad524f3457" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">(l)</legref>, ‘<legref target.doc.id="act-2011-031" refid="sec.4-ssec.2-para1.a" target.guid="_b8a9366e-bf0a-42c6-91d4-acb9626ee6d8" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">paragraphs&#160;(a)</legref> to <legref target.doc.id="act-2011-031" refid="sec.4-ssec.2-para1.k" type="act" check="invalid" jurisd="QLD">(k)</legref>’—</txt><txt break.before="1"><i>omit, insert—</i></txt><fragment format="fromcontext" auto.number.type="manual" style="indent"><block><txt break.before="1">paragraphs (a) to (l)</txt></block></fragment></block></subclause><subclause id="sec.4-ssec.3" guid="_32959f8c-b778-41e8-9fa0-ce71c79db256" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0"><legref target.doc.id="act-2011-031" refid="sec.5" target.guid="_c37f2785-7462-40d6-ac86-33d43df0e26a" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">Section&#160;5</legref><legref target.doc.id="act-2011-031" refid="sec.5-para1.ba" type="act" check="invalid" jurisd="QLD">(ba)</legref> to <legref target.doc.id="act-2011-031" refid="sec.5-para1.l" target.guid="_4d1b482b-af4b-46f2-bf58-efad524f3457" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">(l)</legref>—</txt><txt break.before="1"><i>renumber</i> as <legref target.doc.id="act-2011-031" refid="sec.4-ssec.3-para1.c" type="act" check="invalid" jurisd="QLD">paragraphs&#160;(c)</legref> to <legref target.doc.id="act-2011-031" refid="sec.4-ssec.3-para1.m" type="act" check="invalid" jurisd="QLD">(m)</legref>.</txt></block></subclause></clause><clause id="sec.5" guid="_3ea6dbdd-e830-4034-88ac-20e9c8a36d8c" affected.by.uncommenced="0" spent.amends="0" provision.type="amend"><no>5</no><heading id="sec.5-he" guid="_3bdbf9cf-efce-4284-bb12-3e55bf8ac8be">Amendment of <legref target.doc.id="act-2011-031" refid="sec.8A" target.guid="_0f5ba32f-22f7-4ecf-acc9-535f9b7054fe" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">s&#160;8A</legref> (Meaning of <defterm guid="_99a294b5-db74-44e4-bb28-be53ea70320e" type="mention">waste disposal site</defterm>)</heading><subclause id="sec.5-ssec.1" guid="_37f15b25-a550-4119-bac8-dbf0088000ad" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0"><legref target.doc.id="act-2011-031" refid="sec.8A" target.guid="_0f5ba32f-22f7-4ecf-acc9-535f9b7054fe" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">Section&#160;8A</legref><legref target.doc.id="act-2011-031" refid="sec.8A-para1.b" target.guid="_d9fa3799-af2d-4e91-b970-c4c2a28fb0d2" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">(b)</legref>, ‘commonly’—</txt><txt break.before="1"><i>omit, insert—</i></txt><fragment format="fromcontext" auto.number.type="manual" style="indent"><block><txt break.before="1">sometimes</txt></block></fragment></block></subclause><subclause id="sec.5-ssec.2" guid="_babb3f57-e6f6-4d95-8bcc-32ca40477d33" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0"><legref target.doc.id="act-2011-031" refid="sec.8A" target.guid="_0f5ba32f-22f7-4ecf-acc9-535f9b7054fe" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">Section&#160;8A</legref>—</txt><txt break.before="1"><i>insert—</i></txt><fragment format="fromcontext" auto.number.type="manual" style="indent"><subclause id="sec.5-ssec.2-frag-ssec.2" guid="_1b0a89af-7fdb-47ae-b3f9-07cf0082a402" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">However, a waste facility is not a <defterm id="sec.5-ssec.2-frag-def.wastedisposalsite" guid="_5f279409-e6f1-41c1-af60-a48426296fc1" type="definition">waste disposal site</defterm> only because a type of exempt waste prescribed by regulation for this definition is disposed of to landfill at the facility.</txt></block></subclause></fragment></block></subclause></clause><clause id="sec.6" guid="_24eb18c4-12c9-487d-a025-bbe7e6f935db" affected.by.uncommenced="0" spent.amends="0" provision.type="amend"><no>6</no><heading id="sec.6-he" guid="_ff1eeb34-44b4-412f-b45f-d3d96fabb6d2">Replacement of ch 3 (Obligations of operator of waste disposal site)</heading><block><txt break.before="1"><legref target.doc.id="act-2011-031" refid="ch.3" target.guid="_5a3b45d1-7e69-4d7c-82c8-ad64c309c73a" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">Chapter&#160;3</legref>—</txt><txt break.before="1"><i>omit, insert—</i></txt><fragment format="fromcontext" auto.number.type="manual" style="indent"><chapter id="sec.6-frag-ch.3" guid="_6dbff887-0aa1-4a67-bc7a-4f359d921f27" affected.by.uncommenced="0"><no>Chapter 3</no><heading id="sec.6-frag-ch.3-he" guid="_8b1781ea-df67-4263-905c-2a8a1b8530ae">Waste levy</heading><part id="sec.6-frag-ch.3-pt.1" guid="_2ed2b11a-4d2e-45e1-8a68-c0f646327a1f" affected.by.uncommenced="0"><no>Part 1</no><heading id="sec.6-frag-ch.3-pt.1-he" guid="_957dcd1f-2868-4ea3-9816-b07f27aabdd5">Preliminary</heading><clause id="sec.6-frag-ch.3-pt.1-sec.25" guid="_877cee84-6d61-482f-80af-42a889d449e2" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>25</no><heading id="sec.6-frag-ch.3-pt.1-sec.25-he" guid="_f88fef1c-a22f-45fb-8ff4-82eff86bc863">Main purpose</heading><block><txt break.before="1">The main purpose of this chapter is to impose a levy on waste delivered to a levyable waste disposal site, and to allow for an exemption from the levy, or a discounted levy rate, for particular waste.</txt></block></clause><clause id="sec.6-frag-ch.3-pt.1-sec.26" guid="_7b0483f1-7bf5-4af1-9516-4bc9fe1603f4" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>26</no><heading id="sec.6-frag-ch.3-pt.1-sec.26-he" guid="_06b14793-eaf5-4352-8966-9e78aaafff53">Definitions for chapter</heading><subclause id="sec.6-frag-ch.3-pt.1-sec.26-ssec" guid="_22fa7ca0-d121-465c-95aa-5ad8e7f7d03d" affected.by.uncommenced="0" provision.type="other"><block><txt break.before="0">In this chapter—</txt><deflist><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.activelandfillcell_" guid="_c1094127-a3e2-4320-81c7-980a7f576ad0" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.activelandfillcell" guid="_5d97b800-aac5-4143-8a43-a1cb27724b30" type="definition">active landfill cell</defterm> means that part of a landfill where waste is currently being disposed of.</txt></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.baddebtcredit_" guid="_6d19ea06-44b2-45f9-82fe-07849b68a5b6" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.baddebtcredit" guid="_9ef99514-750f-4f9b-9cd5-d140d823fa92" type="definition">bad debt credit</defterm> see section 72K(1).</txt></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.baddebtcreditapplication_" guid="_76796cd0-3744-4a68-b0c0-619e86889bb6" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.baddebtcreditapplication" guid="_2f8743e3-0b35-480e-960f-7a1907e4363d" type="definition">bad debt credit application</defterm> means an application made under section 72L.</txt></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.disaster_" guid="_a48b9970-e2c2-4988-90d7-31cccc1447f4" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.disaster" guid="_edac648c-4098-4b63-b930-d48970e9941f" type="definition">disaster</defterm> see the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-2003-091" target.version.series="19b3f01d-67ee-4e45-9102-a49dbc9c5a04"><name emphasis="yes">Disaster Management Act 2003</name></legref>, section 13.</txt></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.disastermanagementwaste_" guid="_df6f7032-09e1-45c3-8acb-7f28fad8d715" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.disastermanagementwaste" guid="_44b2eb57-9f45-43fd-9309-9e16d27369a0" type="definition">disaster management waste</defterm> means waste generated by or because of a disaster that is or has been the subject of a declaration of a disaster situation under the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-2003-091" target.version.series="19b3f01d-67ee-4e45-9102-a49dbc9c5a04"><name emphasis="yes">Disaster Management Act 2003</name></legref>, but only within the limits, if any, declared by the chief executive, by publication on the department’s website, for a particular disaster.</txt></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.disastersituation_" guid="_1573b7b3-10f5-421f-a8c6-9a6ef22cbf75" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.disastersituation" guid="_0317908c-c3f6-4b91-96cc-690883d6a508" type="definition">disaster situation</defterm> see the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-2003-091" target.version.series="19b3f01d-67ee-4e45-9102-a49dbc9c5a04"><name emphasis="yes">Disaster Management Act 2003</name></legref>, schedule.</txt></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.discountedrate_" guid="_9e122249-fc05-498b-9a63-7d8fc416ff98" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.discountedrate" guid="_6733ffaf-aaec-4291-a623-c6c8a58dd270" type="definition">discounted rate</defterm>, for the waste levy for residue waste, see section 44(4).</txt></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.dredgespoil_" guid="_477ddb53-eb7c-46a3-8cba-f6ef2f43e599" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.dredgespoil" guid="_e91430dd-86db-4573-977d-01858e3f8990" type="definition">dredge spoil</defterm> means natural material that has been removed from a waterway—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.dredgespoil-para1.a" guid="_b6f959b1-ffa6-43fa-b3ec-7d231511c35b" provision.type="other"><no>(a)</no><block><txt break.before="0">for the purpose of creating, maintaining or enlarging a channel, basin, port, berth or other similar thing; or</txt></block></li><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.dredgespoil-para1.b" guid="_3f7ed27e-4621-4097-903f-552f04ec5724" provision.type="other"><no>(b)</no><block><txt break.before="0">to undertake flood mitigation activities in naturally occurring surface waters.</txt></block></li></list></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.duedateforpayment_" guid="_2bc0acbe-4711-478f-b4b0-88fed2fdeabc" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.duedateforpayment" guid="_a8ef47ac-4986-444b-9f5e-a97c8dfd98be" type="definition">due date for payment</defterm>, of a waste levy amount, means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.duedateforpayment-para1.a" guid="_53475ff7-92bd-4251-b575-f20695f15a1f" provision.type="other"><no>(a)</no><block><txt break.before="0">if an extension of time has been granted under section 72G, 72H or 72I for payment of the waste levy amount—the end of the extension; or</txt></block></li><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.duedateforpayment-para1.b" guid="_3dc0849a-0b98-430b-8aba-6000c8191d58" provision.type="other"><no>(b)</no><block><txt break.before="0">if there is a waste levy instalment agreement in place between the chief executive and the operator of a levyable waste disposal site who owes the amount—the day provided for in the agreement; or</txt></block></li><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.duedateforpayment-para1.c" guid="_1c8b8f4a-01a9-4aca-b895-530e0ecd348f" provision.type="other"><no>(c)</no><block><txt break.before="0">otherwise—the end of the 28th day of the second month after the end of the levy period for the levyable waste disposal site of the operator who owes the amount.</txt></block></li></list></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.exemptwaste_" guid="_036162f6-a16a-46fa-a269-6be32276ffed" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.exemptwaste" guid="_c6c77347-a527-48d3-bc0a-823f4e27eca1" type="definition">exempt waste</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.exemptwaste-para1.a" guid="_a47e2699-e972-44a0-9b2b-de329e76fcf7" provision.type="other"><no>(a)</no><block><txt break.before="0">disaster management waste; or</txt></block></li><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.exemptwaste-para1.aa" guid="_7f315f18-d714-4195-9ee0-e20816f8d247" provision.type="other"><no>(aa)</no><block><txt break.before="0">serious local event waste; or</txt></block></li><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.exemptwaste-para1.b" guid="_1c965f07-78fd-40fd-84f1-c38de6f3ae52" provision.type="other"><no>(b)</no><block><txt break.before="0">waste approved by the chief executive to be exempt waste for a particular exempt waste application; or</txt></block></li><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.exemptwaste-para1.c" guid="_5cfd3baf-8c6c-48a4-9528-0a868db65af8" provision.type="other"><no>(c)</no><block><txt break.before="0">1 of the following types of waste if lawfully managed and transported—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.exemptwaste-para1.c-para2.i" guid="_7f334f38-8360-43bb-9526-477ecbfedd74" provision.type="other"><no>(i)</no><block><txt break.before="0">waste that is any of the following and is not mixed with other types of waste—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.exemptwaste-para1.c-para2.i-para3.A" guid="_1a663aa7-c4fd-4bb7-ada0-f84bf6206481" provision.type="other"><no>(A)</no><block><txt break.before="0">non-friable asbestos-containing material;</txt></block></li><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.exemptwaste-para1.c-para2.i-para3.B" guid="_9d13ecfb-37ee-4695-b2de-6991242b2cbc" provision.type="other"><no>(B)</no><block><txt break.before="0">waste that has asbestos-containing material bonded to it;</txt></block></li><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.exemptwaste-para1.c-para2.i-para3.C" guid="_7a3948aa-7143-4f88-a9ad-5231d2341f96" provision.type="other"><no>(C)</no><block><txt break.before="0">any disposal items used during asbestos removal work including plastic sheeting and disposal tools;</txt></block></li></list></block></li><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.exemptwaste-para1.c-para2.ii" guid="_f2ea2438-cd28-471c-b95e-33427b98735b" provision.type="other"><no>(ii)</no><block><txt break.before="0">waste containing friable asbestos-containing material that has been removed by the holder of an asbestos removal licence issued under the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-2011-018" target.version.series="192711dc-f0de-4bcb-809d-080b81854cef"><name emphasis="yes">Work Health and Safety Act 2011</name> or under another licence or authority that authorises the removal of friable asbestos under a law of another State</legref>; or</txt></block></li></list></block></li><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.exemptwaste-para1.d" guid="_1be8e825-4fcd-4829-9324-045d13ceb4bf" provision.type="other"><no>(d)</no><block><txt break.before="0">dredge spoil if, for dredge spoil that is acid sulfate soil, the dredge spoil has been treated in accordance with best practice environmental management, within the meaning of the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261"><name emphasis="no">Environmental Protection Act</name></legref>, section 21, for the treatment and management of acid sulfate soils, as stated in a guideline prescribed by regulation; or</txt></block></li><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.exemptwaste-para1.e" guid="_e668231b-a75d-41de-be70-503360b52da6" provision.type="other"><no>(e)</no><block><txt break.before="0">clean earth; or</txt></block></li><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.exemptwaste-para1.f" guid="_df2cc514-03a1-4e5d-9d35-1d56a4c7c64f" provision.type="other"><no>(f)</no><block><txt break.before="0">waste collected by or for the State, a local government or a plantation licensee under the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-1959-058" target.version.series="05878269-0f72-4d60-b053-3f083a8d73ea"><name emphasis="yes">Forestry Act 1959</name></legref> to remediate the results of a person having done something that may be an offence under section 103 or 104; or</txt></block></li><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.exemptwaste-para1.g" guid="_abd81498-13b5-4133-865c-4659f6438fca" provision.type="other"><no>(g)</no><block><txt break.before="0">other waste—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.exemptwaste-para1.g-para2.i" guid="_7e2650fc-9536-49eb-8378-fc8074beafe9" provision.type="other"><no>(i)</no><block><txt break.before="0">prescribed by regulation to be exempt waste; or</txt></block></li><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.exemptwaste-para1.g-para2.ii" guid="_d73d3dd5-37ac-43c7-8bb2-6f8315853d18" provision.type="other"><no>(ii)</no><block><txt break.before="0">for which there is in force under this chapter a declaration by the chief executive that the waste is exempt waste.</txt></block></li></list></block></li></list></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.exemptwasteapplication_" guid="_f8e7d5ee-6ac5-4f3a-b16b-9bbddd618bb7" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.exemptwasteapplication" guid="_b9fc5407-445e-4e18-a4e0-375cc9a36c43" type="definition">exempt waste application</defterm> see section 28(1).</txt></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.feedstock_" guid="_cd0d5366-d813-43d8-b481-f7feb4c24975" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.feedstock" guid="_e2e48683-1f85-4400-8542-ac8e17156605" type="definition">feedstock</defterm>, for a recycling activity, means the waste or other material that is to be used for the recycling activity.</txt></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.friableasbestoscontainingmaterial_" guid="_40491987-d546-499a-af2c-bd13a98eae2b" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.friableasbestoscontainingmaterial" guid="_39580d58-7c4e-42ed-acb4-179b78f873e0" type="definition">friable asbestos-containing material</defterm> means material containing asbestos that is in powder form or that can be crumbled, pulverized or reduced to powder by hand when dry.</txt></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.lawfullymanagedandtransported_" guid="_8167ea9d-fc4a-463f-9adc-71ab6883bd06" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.lawfullymanagedandtransported" guid="_78871c82-eefb-4c6e-94d6-d2729ff64e09" type="definition">lawfully managed and transported</defterm>, for asbestos or waste containing asbestos, means managed and transported in compliance with the requirements applying, under the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-2005-048" target.version.series="a0e0f082-c057-4815-b921-264c76837ae7"><name emphasis="yes">Public Health Act 2005</name></legref> and any other Act, to its management and transport.</txt></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.levyablewaste_" guid="_2ee55646-6ef9-4f80-a8f5-b2c13d8faee7" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.levyablewaste" guid="_0937769e-e2fa-4f61-b209-25805d72e15f" type="definition">levyable waste</defterm> means waste, other than exempt waste, that is delivered to a levyable waste disposal site.</txt></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.levyablewastedisposalsite_" guid="_896ce143-4861-4d7c-a90d-f8efcd82d9a9" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.levyablewastedisposalsite" guid="_f10d7976-9c44-461b-b4dc-63706731e87d" type="definition">levyable waste disposal site</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.levyablewastedisposalsite-para1.a" guid="_76c86779-690d-4272-8da7-ed9807ad2ffa" provision.type="other"><no>(a)</no><block><txt break.before="0">means a waste disposal site, whether under the ownership or control of the State, a local government or otherwise; but</txt></block></li><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.levyablewastedisposalsite-para1.b" guid="_21d4b193-d299-4974-815c-93c42e41904d" provision.type="other"><no>(b)</no><block><txt break.before="0">does not include a part of the waste disposal site that is a resource recovery area.</txt></block></li></list></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.levyperiod_" guid="_ead311d1-4cf9-4fbf-84ea-1d466186045a" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.levyperiod" guid="_75b04e00-baf8-454b-947b-164d51fdccf3" type="definition">levy period</defterm>, for a levyable waste disposal site, means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.levyperiod-para1.a" guid="_74726671-3ba6-442c-9038-8ff8514e629a" provision.type="other"><no>(a)</no><block><txt break.before="0">for a section 325 small site, until 30 June 2021—either of the following periods—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.levyperiod-para1.a-para2.i" guid="_28866629-2dab-40d3-8272-ffcd8a65c934" provision.type="other"><no>(i)</no><block><txt break.before="0">the period starting on 1 July 2019 and ending on 30 June 2020;</txt></block></li><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.levyperiod-para1.a-para2.ii" guid="_de7642ce-1337-4d94-ba64-8fa80be21c20" provision.type="other"><no>(ii)</no><block><txt break.before="0">the period starting on 1 July 2020 and ending on 30 June 2021; or</txt></block></li></list></block></li><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.levyperiod-para1.b" guid="_057552d0-964c-465d-94e8-4a52128f60a4" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—a month.</txt></block></li></list></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.monitoringsystem_" guid="_74f3c124-3328-425d-91bb-3df7b1fb1621" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.monitoringsystem" guid="_70d42274-b4b3-4fa7-8ced-60b44e2f59bf" type="definition">monitoring system </defterm>see section 62.</txt></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.nonfriableasbestoscontainingmaterial_" guid="_040f3a0b-999e-4a1c-8c40-235464a81d93" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.nonfriableasbestoscontainingmaterial" guid="_61eb1e1e-baba-43f3-a2f7-864265d1ad4c" type="definition">non-friable asbestos-containing material</defterm> means any manufactured material or thing that—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.nonfriableasbestoscontainingmaterial-para1.a" guid="_3a18f845-10c6-4995-88d2-052026ae9594" provision.type="other"><no>(a)</no><block><txt break.before="0">contains asbestos as part of its design; but</txt></block></li><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.nonfriableasbestoscontainingmaterial-para1.b" guid="_87eef571-40ed-4c10-a610-259a72eb4536" provision.type="other"><no>(b)</no><block><txt break.before="0">does not contain friable asbestos-containing material.</txt></block></li></list></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.nonlevyzone_" guid="_e709ec16-414e-485d-abb0-079118bed522" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.nonlevyzone" guid="_1c8fccb0-a98e-43db-90f9-5c269211bd10" type="definition">non-levy zone</defterm> means the part of the State outside the waste levy zone.</txt></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.progressivecapping_" guid="_ca34cbe3-f7f7-4a89-bac3-249a616f2c00" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.progressivecapping" guid="_bb9a490c-2a4c-480c-a324-b36dd67aa551" type="definition">progressive capping</defterm> means capping of active landfill cells at a waste disposal site on a cell-by-cell basis.</txt></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.residuewaste_" guid="_a6d07067-edc8-4dbb-ab81-4e23d94952a0" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.residuewaste" guid="_49085bc9-f2db-4cf2-a330-b3626fbc827e" type="definition">residue waste</defterm> means the waste from a recycling activity that is commonly disposed of to landfill after the recoverable components have been removed from material.</txt><note id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.residuewaste-note" guid="_6bc930e7-ab39-435d-9a73-45e70ffa3de4" type="example"><heading id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.residuewaste-note-he" guid="_727020ce-5631-4c09-a025-03a8d47a0463">Example of residue waste—</heading><block><txt break.before="1">In metal recycling, the residue waste is the mainly non-metal component that results from recycling products such as motor vehicles, whitegoods, televisions and computers that have reached the end of their useful life.</txt></block></note></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.residuewastediscountingapplication_" guid="_3d1d2e54-aae2-49ce-bcd3-13ed498e018b" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.residuewastediscountingapplication" guid="_47cd4fc2-38a8-4f13-ad18-9feb77b28862" type="definition">residue waste discounting application</defterm> see section 44(1).</txt></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.resourcerecoveryarea_" guid="_0a5f7d3e-8e00-4eaf-8145-945fbcad6120" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.resourcerecoveryarea" guid="_b3f142ca-0fca-48f9-9604-9cb26f85e506" type="definition">resource recovery area</defterm> see section 72R.</txt></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.section325smallsite_" guid="_240a4752-6864-47d9-91ab-09eb478bd6bd" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.section325smallsite" guid="_d9ce9130-0d4b-492e-a4a6-7883e3213a97" type="definition">section 325 small site</defterm> means a small site the operator of which, under section 325, is not required to comply with the requirements of section 61(2) to measure and record waste in compliance with the weight measurement criteria.</txt></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.seriouslocalevent_" guid="_59808196-d30c-42b6-aad4-16815dfd36fa" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.seriouslocalevent" guid="_59b11612-a04d-4d34-966a-c6f992c7f696" type="definition">serious local event</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.seriouslocalevent-para1.1" guid="_831b6d7e-90a5-4b22-ad40-8d7d93bc3363" provision.type="other"><no>1</no><block><txt break.before="0">A <defterm guid="_83c0ab82-f60c-436c-bfba-e09b8179a8c9" type="mention">serious local event</defterm> is a serious disruption in a community, caused by the impact of an event, that requires a significant coordinated response by a local government and other entities to help the community recover from the disruption.</txt></block></li><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.seriouslocalevent-para1.2" guid="_4a54990b-87db-4429-975a-3216dafe1275" provision.type="other"><no>2</no><block><txt break.before="0">For paragraph 1—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.seriouslocalevent-para1.2-para2.a" guid="_6a05dd78-09ad-4e8e-8ac7-647ae6904d79" provision.type="other"><no>(a)</no><block><txt break.before="0">a serious disruption is—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.seriouslocalevent-para1.2-para2.a-para3.i" guid="_6ee5c8c9-c9b6-41b8-89fc-788c6f0500db" provision.type="other"><no>(i)</no><block><txt break.before="0">loss of human life, or illness or injury to humans; or</txt></block></li><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.seriouslocalevent-para1.2-para2.a-para3.ii" guid="_0b8f77e2-41f9-44c5-a313-50a2309cf7ce" provision.type="other"><no>(ii)</no><block><txt break.before="0">widespread or severe property loss or damage; or</txt></block></li><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.seriouslocalevent-para1.2-para2.a-para3.iii" guid="_1163d7f5-4d71-4106-98a8-9db702ce647f" provision.type="other"><no>(iii)</no><block><txt break.before="0">widespread or severe damage to the environment; and</txt></block></li></list></block></li><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.seriouslocalevent-para1.2-para2.b" guid="_2d250149-11d8-432d-a2c0-e4c81528a654" provision.type="other"><no>(b)</no><block><txt break.before="0">an event is an event under the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-2003-091" target.version.series="19b3f01d-67ee-4e45-9102-a49dbc9c5a04"><name emphasis="yes">Disaster Management Act 2003</name></legref>, section 16.</txt></block></li></list></block></li></list></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.seriouslocaleventwaste_" guid="_cab436a8-3522-42d4-b05b-210b27b633c8" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.seriouslocaleventwaste" guid="_dd1804b8-1a97-4ba0-bd0a-cefd78fb29aa" type="definition">serious local event waste</defterm>— </txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.seriouslocaleventwaste-para1.a" guid="_7cf42b40-d79c-4740-b308-d1846efadc18" provision.type="other"><no>(a)</no><block><txt break.before="0">means waste generated by activities in the immediate preparation for, or by or because of, a serious local event—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.seriouslocaleventwaste-para1.a-para2.i" guid="_0dd0fd6c-a602-41ce-b81f-a1839a6bb6c2" provision.type="other"><no>(i)</no><block><txt break.before="0">but only within the limits, if any, declared by the chief executive under section 27B, for the serious local event; and</txt></block></li><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.seriouslocaleventwaste-para1.a-para2.ii" guid="_10a59183-ccd4-4a97-a3a1-b09353200cae" provision.type="other"><no>(ii)</no><block><txt break.before="0">subject to the requirements of section 27A; but</txt></block></li></list></block></li><li id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.seriouslocaleventwaste-para1.b" guid="_01e44226-9600-4a6c-acf1-007ee1e7912e" provision.type="other"><no>(b)</no><block><txt break.before="0">does not include waste generated by activities in general preparation for storms that are predicted or are likely to occur in a particular season each year or in anticipation of the next cyclone season.</txt></block></li></list></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.smallsite_" guid="_79940993-feb4-40e9-8595-17eb921d1d6a" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.smallsite" guid="_67d83eb8-0632-41e5-bbae-a1817a730675" type="definition">small site</defterm> means a levyable waste disposal site the operator of which is required to hold an environmental authority for the disposal of 2,000 tonnes or less of waste in a year at the site.</txt></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.wastedatareturn_" guid="_f0a16560-ae65-4cfe-aa91-c82267bfb405" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.wastedatareturn" guid="_475c1dd0-bdb8-4644-bf16-6ff1375e4c80" type="definition">waste data return</defterm> see section 72(1).</txt></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.wastelevy_" guid="_e0d19600-087c-4392-b8d6-f437206f5fbf" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.wastelevy" guid="_37c7efec-e1f0-4477-8ffb-048f02ecbbfc" type="definition">waste levy</defterm> see section 36.</txt></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.wastelevyamount_" guid="_db08bb61-4432-40c9-83a3-5a854f50c30f" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.wastelevyamount" guid="_d22a9852-829b-43b8-b4b6-b54dd825bf93" type="definition">waste levy amount</defterm> means an amount of waste levy.</txt></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.wastelevyinstalmentagreement_" guid="_9ea5f17c-f522-463a-a09b-71625bcf05a7" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.wastelevyinstalmentagreement" guid="_8a72973a-b24b-46a5-9e10-6c545b43526c" type="definition">waste levy instalment agreement</defterm> see section 72B(1).</txt></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.wastelevyzone_" guid="_af9e88d7-a32b-41a6-b940-61174c478e08" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.wastelevyzone" guid="_8c0e32b7-066e-4676-90a0-578fc124e67c" type="definition">waste levy zone</defterm> means the part of the State made up of the local government areas prescribed by regulation as provided for in this chapter.</txt></definition><definition id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.weightmeasurementcriteria_" guid="_8f0c12bd-7f47-4aff-83ab-4e6e260e8b07" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.1-sec.26-ssec-def.weightmeasurementcriteria" guid="_552c7886-1a9d-4fff-92e5-7266715e3666" type="definition">weight measurement criteria</defterm> means the weight measurement criteria prescribed by regulation.</txt></definition></deflist></block></subclause></clause></part><part id="sec.6-frag-ch.3-pt.2" guid="_d592dda9-3efc-4573-8e35-86dfaa18684b" affected.by.uncommenced="0"><no>Part 2</no><heading id="sec.6-frag-ch.3-pt.2-he" guid="_9b819c1a-68d7-489a-8e5d-f117d2fd184f">Identifying exempt waste</heading><division id="sec.6-frag-ch.3-pt.2-div.1" guid="_6d4ebb9a-0ebf-4e48-bed2-37c6105d0db5" affected.by.uncommenced="0"><no>Division 1</no><heading id="sec.6-frag-ch.3-pt.2-div.1-he" guid="_308b8e16-a179-473b-99c4-20158ba4ad63">Declaring limits for disaster management waste</heading><clause id="sec.6-frag-ch.3-pt.2-div.1-sec.27" guid="_fc0d1d5f-4ffe-40ac-a689-13f6d1f5a96d" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>27</no><heading id="sec.6-frag-ch.3-pt.2-div.1-sec.27-he" guid="_04c7109d-9d5a-43ea-a0f9-5047f0f55f14">Chief executive may declare limits for disaster management waste</heading><subclause id="sec.6-frag-ch.3-pt.2-div.1-sec.27-ssec.1" guid="_00060e71-97d8-44e7-b700-f2446e155171" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may, by publication on the department’s website, declare limits applying to the status of waste as disaster management waste in relation to a particular disaster.</txt></block><note id="sec.6-frag-ch.3-pt.2-div.1-sec.27-ssec.1-note" guid="_49887ac2-f202-4600-80ec-2e2f75fba38b" type="example"><heading id="sec.6-frag-ch.3-pt.2-div.1-sec.27-ssec.1-note-he" guid="_4a165016-feb2-4cf0-9fc0-250419cbd149">Examples of declared limits—</heading><block><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.2-div.1-sec.27-ssec.1-note-para1" guid="_15b11055-a1a3-4ad7-a985-ad5376c0a29a" provision.type="other"><no>•</no><block><txt break.before="0">a declaration that waste is disaster management waste only for a stated period</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.1-sec.27-ssec.1-note-para1-oc.2" guid="_0b97a2a2-93c1-4c89-868a-a643c59674d4" provision.type="other"><no>•</no><block><txt break.before="0">a declaration that waste is disaster management waste only if it is disposed of at a stated site</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.1-sec.27-ssec.1-note-para1-oc.3" guid="_7be697be-ff8c-45e6-bd74-7395074ee2af" provision.type="other"><no>•</no><block><txt break.before="0">a declaration that, after a stated day, waste is disaster management waste only if delivered by stated entities</txt></block></li></list></block></note></subclause><subclause id="sec.6-frag-ch.3-pt.2-div.1-sec.27-ssec.2" guid="_43d7e561-6441-4809-a39b-346f13f7df3d" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">If the chief executive makes a declaration under subsection (1), the chief executive must take all reasonable steps to ensure that persons likely to be directly affected by the declaration are made aware of it, including, for example, by advertising in newspapers, on radio or on television.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.2-div.1-sec.27-ssec.3" guid="_27cb0c00-2c7d-4521-8eee-434ceb697b3a" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">A declaration made under subsection (1) is not invalid because of a failure to comply with subsection (2).</txt></block></subclause></clause></division><division id="sec.6-frag-ch.3-pt.2-div.1A" guid="_64f0c551-bfde-4f1b-b592-5da9c79d9d74" affected.by.uncommenced="0"><no>Division 1A</no><heading id="sec.6-frag-ch.3-pt.2-div.1A-he" guid="_6820379e-ee2c-41e5-8c71-de418563ce02">Serious local event waste</heading><clause id="sec.6-frag-ch.3-pt.2-div.1A-sec.27A" guid="_04174ba0-84ca-4389-a0f5-60f5b96222e5" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>27A </no><heading id="sec.6-frag-ch.3-pt.2-div.1A-sec.27A-he" guid="_099c4578-5a47-4ac8-9a25-7533e5c229c9">Notifying chief executive that waste is serious local event waste in particular circumstances</heading><subclause id="sec.6-frag-ch.3-pt.2-div.1A-sec.27A-ssec.1" guid="_9227e582-e353-4069-8799-7fdf8a0b83a9" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the chief executive officer of a local government reasonably believes—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.2-div.1A-sec.27A-ssec.1-para1.a" guid="_260c926f-d2d5-4b39-ae4b-edcadd6d9bc0" provision.type="other"><no>(a)</no><block><txt break.before="0">there is or will be a serious local event in the local government’s local government area; and</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.1A-sec.27A-ssec.1-para1.b" guid="_fe7304ab-85ed-4651-b663-3c23a6d6c98e" provision.type="other"><no>(b)</no><block><txt break.before="0">an exemption from the levy on types of waste generated as a result of the serious local event and delivered to particular waste disposal sites should be allowed.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.2-div.1A-sec.27A-ssec.2" guid="_2f68e76f-0a41-4e95-aa6b-a0474c7dfbc3" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive officer must notify the chief executive as soon as practicable of the following matters in relation to waste that has been or will be generated as a result of the serious local event—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.2-div.1A-sec.27A-ssec.2-para1.a" guid="_1be0351a-4150-461e-82a4-a8d30f5804cc" provision.type="other"><no>(a)</no><block><txt break.before="0">the type of waste that is to be serious local event waste;</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.1A-sec.27A-ssec.2-para1.b" guid="_44a4acfe-3853-4bff-a732-25d83517d00e" provision.type="other"><no>(b)</no><block><txt break.before="0">the waste disposal sites at which the waste will be disposed of;</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.1A-sec.27A-ssec.2-para1.c" guid="_57183973-56fa-4112-b4e8-9cf35eb9b955" provision.type="other"><no>(c)</no><block><txt break.before="0">the period for which the waste is to be serious local event waste.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.2-div.1A-sec.27A-ssec.3" guid="_b50b609f-ccfe-4b67-b728-33ccfe3e4677" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The maximum period for subsection (2)(c) is the period starting 7 days immediately before the serious local event starts or is predicted to start and ending 28 days after the serious local event ends. </txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.2-div.1A-sec.27A-ssec.4" guid="_064d98eb-d012-454c-a9a4-495ca86aba13" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">If the chief executive officer acts under subsection (2), and subject to section 27B, the type of waste stated in the notice is serious local event waste if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.2-div.1A-sec.27A-ssec.4-para1.a" guid="_d7ea0fc4-9ab2-4249-b84f-2bc69ad75b35" provision.type="other"><no>(a)</no><block><txt break.before="0">waste of that type is delivered to a stated waste disposal site during the stated period; and</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.1A-sec.27A-ssec.4-para1.b" guid="_79aafd19-6982-4266-ae4e-f7d02b47f932" provision.type="other"><no>(b)</no><block><txt break.before="0">the site operator of the waste disposal site does not charge for the delivery of the waste to the site.</txt></block></li></list></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.2-div.1A-sec.27B" guid="_78cd230d-0dc7-4124-9ce8-fdac652fcef7" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>27B </no><heading id="sec.6-frag-ch.3-pt.2-div.1A-sec.27B-he" guid="_9ee4b75b-b9b5-4dd7-9c11-18e67d710bbe">Chief executive may declare limits for serious local event waste</heading><subclause id="sec.6-frag-ch.3-pt.2-div.1A-sec.27B-ssec.1" guid="_8db5a1c7-e875-45ba-b7b2-089f6dc66899" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may, by publication on the department’s website, declare limits applying to the status of waste as serious local event waste in relation to a particular serious local event.</txt></block><note id="sec.6-frag-ch.3-pt.2-div.1A-sec.27B-ssec.1-note" guid="_57fc5deb-9912-4e01-9758-7b0e2d78c55d" type="example"><heading id="sec.6-frag-ch.3-pt.2-div.1A-sec.27B-ssec.1-note-he" guid="_b38fe5a3-c8f5-4876-b570-fc8cce946d72">Examples of declared limits—</heading><block><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.2-div.1A-sec.27B-ssec.1-note-para1" guid="_b759ee1b-17b8-48c0-bca2-fa4e321cce27" provision.type="other"><no>•</no><block><txt break.before="0">a declaration that waste is serious local event waste only for a stated period</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.1A-sec.27B-ssec.1-note-para1-oc.2" guid="_2a5a4f02-6122-40c6-8bcc-57257f020aad" provision.type="other"><no>•</no><block><txt break.before="0">a declaration that waste is serious local event waste only if it is disposed of at a stated site</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.1A-sec.27B-ssec.1-note-para1-oc.3" guid="_6f9967f5-c61d-42fe-b963-1910bb213bb1" provision.type="other"><no>•</no><block><txt break.before="0">a declaration that, after a stated day, waste is serious local event waste only if delivered by stated entities</txt></block></li></list></block></note></subclause><subclause id="sec.6-frag-ch.3-pt.2-div.1A-sec.27B-ssec.2" guid="_609e0ac3-c67d-41f5-a918-be0e94bb74f6" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">If the chief executive makes a declaration under subsection (1), the chief executive must take all reasonable steps to ensure that persons likely to be directly affected by the declaration are made aware of it, including, for example, by advertising in newspapers, on radio or on television. </txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.2-div.1A-sec.27B-ssec.3" guid="_da926939-5021-4c96-b829-9921af7cb895" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">A declaration made under subsection (1) is not invalid merely because of a failure to comply with subsection (2). </txt></block></subclause></clause></division><division id="sec.6-frag-ch.3-pt.2-div.2" guid="_1d3ea5fc-918d-45d3-bb7b-52a00ee960ce" affected.by.uncommenced="0"><no>Division 2</no><heading id="sec.6-frag-ch.3-pt.2-div.2-he" guid="_3c05f5e2-21c1-44b5-b1e2-1cb5ea9753d3">Approval of waste as exempt waste</heading><clause id="sec.6-frag-ch.3-pt.2-div.2-sec.28" guid="_9d431315-92c0-4455-9d1b-f8bd01d2fdfd" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>28</no><heading id="sec.6-frag-ch.3-pt.2-div.2-sec.28-he" guid="_93eb1080-8c78-48e7-9ae8-5260389ae850">Application for approval of waste as exempt waste</heading><subclause id="sec.6-frag-ch.3-pt.2-div.2-sec.28-ssec.1" guid="_8535fa79-cbec-41f1-87fb-ce1ec825c567" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">A person may apply to the chief executive for approval of waste, identified in the application (an <defterm id="sec.6-frag-ch.3-pt.2-div.2-sec.28-def.exemptwasteapplication" guid="_dbf06daa-bb3f-4e37-8c6f-eba10f3ffb15" type="definition">exempt waste application</defterm>), as exempt waste.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.2-div.2-sec.28-ssec.2" guid="_9cb46362-249a-480e-ac54-90f96caca337" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the application may be about only 1 of the following types of waste—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.2-div.2-sec.28-ssec.2-para1.a" guid="_273c9928-847e-4f12-a402-7dc06fa7b689" provision.type="other"><no>(a)</no><block><txt break.before="0">waste that has been donated to a charitable recycling entity but that can not practicably be re-used, recycled or sold;</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.2-sec.28-ssec.2-para1.b" guid="_e0b683b0-93a0-41cd-ac2d-004a21748d99" provision.type="other"><no>(b)</no><block><txt break.before="0">waste collected by members of the community during an organised event directed at remediating the results of a person having done something that may be an offence under section 103 or 104;</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.2-sec.28-ssec.2-para1.c" guid="_695cb993-4cc2-4f81-b611-e6c55d4d6de4" provision.type="other"><no>(c)</no><block><txt break.before="0">earth contaminated with a hazardous contaminant from land recorded in the environmental management register or contaminated land register;</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.2-sec.28-ssec.2-para1.d" guid="_9eb91ffe-cf33-44e1-80cb-bb5d804f9fcf" provision.type="other"><no>(d)</no><block><txt break.before="0">waste to be used at a levyable waste disposal site for a purpose necessary for the operation of the site, including, for example, building infrastructure, temporary or daily covering, progressive capping, batter construction, final capping, profiling and site rehabilitation;</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.2-sec.28-ssec.2-para1.e" guid="_908dc4a8-4572-4e91-b743-6d12db079985" provision.type="other"><no>(e)</no><block><txt break.before="0">biosecurity waste;</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.2-sec.28-ssec.2-para1.f" guid="_0937c5a9-0761-4bce-a8c4-60c613533b42" provision.type="other"><no>(f)</no><block><txt break.before="0">serious local event waste.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.2-div.2-sec.28-ssec.3" guid="_7b396092-a424-455e-bb20-3c170b4a5848" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, if the application is about biosecurity waste, the application may be made only by the chief executive of the department in which the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-2014-007" target.version.series="b1055c40-53b8-4360-8bea-49d7bc80473c"><name emphasis="yes">Biosecurity Act 2014</name></legref> is administered.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.2-div.2-sec.28-ssec.3A" guid="_16b70093-460c-430a-8a62-74e644941835" affected.by.uncommenced="0" provision.type="other"><no>(3A)</no><block><txt break.before="0">In addition, if the application is about serious local event waste, the application may be made only by the chief executive officer of the local government in whose local government area the serious local event waste was generated.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.2-div.2-sec.28-ssec.4" guid="_5d180a68-727c-47c9-b4f1-e602dfb50ae6" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">The application must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.2-div.2-sec.28-ssec.4-para1.a" guid="_32292283-d5ae-4a8b-a786-f11c9640dd6c" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.2-sec.28-ssec.4-para1.b" guid="_c5904c13-b992-46d7-9520-c64091becb6f" provision.type="other"><no>(b)</no><block><txt break.before="0">be supported by enough information to allow the chief executive to decide the application; and</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.2-sec.28-ssec.4-para1.c" guid="_db743894-7ebe-47b4-8802-ad4bb118b449" provision.type="other"><no>(c)</no><block><txt break.before="0">be accompanied by the fee prescribed by regulation.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.2-div.2-sec.28-ssec.5" guid="_3155b76a-8ce5-41cc-a24a-9213833fc8f3" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sec.6-frag-ch.3-pt.2-div.2-sec.28-ssec.5-def.biosecuritywaste_" guid="_5eb72ce4-cd07-4684-98a9-28a9a3b4e794" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.2-div.2-sec.28-ssec.5-def.biosecuritywaste" guid="_39f6627d-8977-4730-8527-14574bf2f8e3" type="definition">biosecurity waste</defterm> means waste made up of matter that is subject to the operation of the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-2014-007" target.version.series="b1055c40-53b8-4360-8bea-49d7bc80473c"><name emphasis="yes">Biosecurity Act 2014</name>.</legref></txt></definition><definition id="sec.6-frag-ch.3-pt.2-div.2-sec.28-ssec.5-def.charitablerecyclingentity_" guid="_193461c1-c617-4050-a816-100f5854b9a9" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.2-div.2-sec.28-ssec.5-def.charitablerecyclingentity" guid="_68cfd5ed-ca27-4b75-a7fa-2a1a19624826" type="definition">charitable recycling entity</defterm> means an entity that—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.2-div.2-sec.28-ssec.5-def.charitablerecyclingentity-para1.a" guid="_0c8d4a86-e64a-4c5c-b5e7-1582ec282c7b" provision.type="other"><no>(a)</no><block><txt break.before="0">operates on a not-for-profit basis; and</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.2-sec.28-ssec.5-def.charitablerecyclingentity-para1.b" guid="_6f6e811c-c7a3-4097-a9ce-a439c14af63e" provision.type="other"><no>(b)</no><block><txt break.before="0">is registered as a charity under the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-1966-007" target.version.series="c144aafe-c245-4fcb-880e-775629999e23"><name emphasis="yes">Collections Act 1966</name></legref>; and</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.2-sec.28-ssec.5-def.charitablerecyclingentity-para1.c" guid="_48df30c7-695d-4f9a-bdf0-622db6a32b71" provision.type="other"><no>(c)</no><block><txt break.before="0">is a Deductible Gift Recipient for the purposes of laws administered by the Australian Taxation Office of the Commonwealth; and</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.2-sec.28-ssec.5-def.charitablerecyclingentity-para1.d" guid="_bc02ae23-7685-49e8-a741-bc7c99937cba" provision.type="other"><no>(d)</no><block><txt break.before="0">actively and consistently operates a recycling or re-use program for—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.2-div.2-sec.28-ssec.5-def.charitablerecyclingentity-para1.d-para2.i" guid="_703b099e-5692-40fc-b1a3-4a4b92fac58a" provision.type="other"><no>(i)</no><block><txt break.before="0">providing emergency assistance; or</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.2-sec.28-ssec.5-def.charitablerecyclingentity-para1.d-para2.ii" guid="_e69ec643-7523-47a1-8463-d8b2feab5285" provision.type="other"><no>(ii)</no><block><txt break.before="0">otherwise supporting the charitable purposes of the entity.</txt></block></li></list></block></li></list></definition></deflist></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.2-div.2-sec.29" guid="_27ae82e5-d314-4b99-a05e-dd9aaa56e913" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>29</no><heading id="sec.6-frag-ch.3-pt.2-div.2-sec.29-he" guid="_bcfa2a04-ba82-4892-a148-3b2fa75d176e">Chief executive may require additional information or documents</heading><subclause id="sec.6-frag-ch.3-pt.2-div.2-sec.29-ssec.1" guid="_7013ee85-a410-4210-bbc9-77af585a9b45" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">Within 28 days after receiving an exempt waste application, the chief executive may, by notice given to the applicant, require the applicant to give the chief executive further reasonable information or documents about the application by a reasonable day stated in the notice.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.2-div.2-sec.29-ssec.2" guid="_6ae3607b-2dc8-435c-a7eb-98d54e7f3562" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The applicant may, before the stated day, agree with the chief executive about extending the time for providing the further information or documents.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.2-div.2-sec.29-ssec.3" guid="_a0f9699e-ed4e-4e6a-98b2-c2c880f021cb" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The application is taken to be withdrawn if the applicant does not give the chief executive the further information or documents by the stated day or the end of any extension agreed between the chief executive and the applicant.</txt></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.2-div.2-sec.30" guid="_aeb57b05-ddd0-4131-ba84-3209a53aaee4" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>30</no><heading id="sec.6-frag-ch.3-pt.2-div.2-sec.30-he" guid="_19d21744-1832-4a90-8b41-144f6252ce6d">Deciding application</heading><subclause id="sec.6-frag-ch.3-pt.2-div.2-sec.30-ssec.1" guid="_c73e48b5-d08f-43e0-b69a-e01653279118" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must decide either to grant or to refuse an exempt waste application within 28 days after the later of the following days—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.2-div.2-sec.30-ssec.1-para1.a" guid="_be87681d-de80-46da-8b42-d6cbbdb7613c" provision.type="other"><no>(a)</no><block><txt break.before="0">the day the chief executive receives the application;</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.2-sec.30-ssec.1-para1.b" guid="_1f1fcddc-5911-4713-814b-6f639257e8fd" provision.type="other"><no>(b)</no><block><txt break.before="0">if additional information or documents are requested under section 29—the day the chief executive receives the information or documents.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.2-div.2-sec.30-ssec.2" guid="_688a8339-20c7-46df-a43e-c32ad363955c" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">In deciding the application, the chief executive must consider—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.2-div.2-sec.30-ssec.2-para1.a" guid="_09bd1eaf-4dce-4de3-98e4-679666819783" provision.type="other"><no>(a)</no><block><txt break.before="0">the objects of this Act; and</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.2-sec.30-ssec.2-para1.b" guid="_2edf0fdb-9041-4fda-86fd-9d584fc6c6b5" provision.type="other"><no>(b)</no><block><txt break.before="0">the information outlined in the application.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.2-div.2-sec.30-ssec.3" guid="_e6fa0986-efe9-4e9e-99c4-80c6a924bc30" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the chief executive must refuse the application in the circumstances prescribed by regulation. </txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.2-div.2-sec.30-ssec.4" guid="_dfb4d344-34c4-44c0-a482-ece9a9f6124d" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">A failure to make a decision within the period required is taken to be a decision by the chief executive to refuse the application.</txt></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.2-div.2-sec.31" guid="_4aba5567-af8b-45ae-852d-5d933ce66a6c" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>31</no><heading id="sec.6-frag-ch.3-pt.2-div.2-sec.31-he" guid="_2eadb941-d102-456e-bf8b-16bc5d2901c8">Grant of application</heading><subclause id="sec.6-frag-ch.3-pt.2-div.2-sec.31-ssec.1" guid="_294081a7-3fa0-44e2-8d03-149f6207f4ec" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">If the chief executive grants an exempt waste application, the chief executive must, within 5 business days after granting the application, give the applicant notice of the approval stating the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.2-div.2-sec.31-ssec.1-para1.a" guid="_1dcd932a-7b1f-4e05-844f-8eea61ff6ebd" provision.type="other"><no>(a)</no><block><txt break.before="0">the application has been granted;</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.2-sec.31-ssec.1-para1.b" guid="_c14dfd14-f520-4bd8-a916-33500eecaeed" provision.type="other"><no>(b)</no><block><txt break.before="0">the waste that has been approved as exempt waste;</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.2-sec.31-ssec.1-para1.c" guid="_de6b41b0-ad52-4167-be85-5b8028c78169" provision.type="other"><no>(c)</no><block><txt break.before="0">the period of the approval;</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.2-sec.31-ssec.1-para1.d" guid="_cb04120c-db93-4579-becc-08ca12d3c51f" provision.type="other"><no>(d)</no><block><txt break.before="0">any conditions imposed on the approval.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.2-div.2-sec.31-ssec.2" guid="_c1a157ef-4bc5-4a2e-9553-c6a00e2f3545" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The period of the approval must not be more than 3 years.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.2-div.2-sec.31-ssec.3" guid="_6c2de50a-7ad7-47fe-964a-590e1bb88a1b" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">If the chief executive imposes a condition on the approval that is not the same, or substantially the same, as a condition agreed to or asked for by the applicant, the notice must also include or be accompanied by an information notice for the decision to impose the condition.</txt></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.2-div.2-sec.32" guid="_db6045b8-3d8a-471c-a64b-a65c666d555b" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>32</no><heading id="sec.6-frag-ch.3-pt.2-div.2-sec.32-he" guid="_b1020cc2-1fe9-4287-b0a8-c18d4df7c5b6">Refusal of application</heading><block><txt break.before="1">If the chief executive refuses an exempt waste application, the chief executive must, within 5 business days after refusing the application, give the applicant an information notice for the decision.</txt></block></clause><clause id="sec.6-frag-ch.3-pt.2-div.2-sec.33" guid="_bdd0608a-75d7-48bb-b82e-e8f9b1d8f1a6" affected.by.uncommenced="0" spent.amends="0" provision.type="amend"><no>33</no><heading id="sec.6-frag-ch.3-pt.2-div.2-sec.33-he" guid="_d912d0aa-9fc3-43e3-a9e6-ba391710233c">Amendment of approval by agreement</heading><subclause id="sec.6-frag-ch.3-pt.2-div.2-sec.33-ssec.1" guid="_6f5ff09e-19cc-431a-99f9-e9fc8f7945ba" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may amend an approval of waste as exempt waste by agreement between the chief executive and the holder of the approval.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.2-div.2-sec.33-ssec.2" guid="_3693f495-63df-4823-9d3b-942fe8711d42" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">If the holder of the approval asks for the amendment, the request must be accompanied by the fee prescribed by regulation.</txt></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.2-div.2-sec.34" guid="_47a33024-a911-4722-8b53-252c4db78965" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>34</no><heading id="sec.6-frag-ch.3-pt.2-div.2-sec.34-he" guid="_b7c546c1-ffe0-42d5-a49b-321695518c18">Cancellation or amendment of approval by chief executive</heading><subclause id="sec.6-frag-ch.3-pt.2-div.2-sec.34-ssec.1" guid="_8df5cbac-02f8-4943-8c7a-726790370d6c" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may cancel or amend an approval of waste as exempt waste if the chief executive considers there are reasonable grounds to cancel or amend it.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.2-div.2-sec.34-ssec.2" guid="_e32b3a99-3fd4-4d6d-bdc2-9ecad5ae364a" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting subsection (1), the grounds for cancelling or amending the approval may include—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.2-div.2-sec.34-ssec.2-para1.a" guid="_71b4bb8d-5cc5-4e30-8a7d-246635d4b38f" provision.type="other"><no>(a)</no><block><txt break.before="0">that the chief executive is satisfied there is a reasonable suspicion that the granting of the approval was based on incorrect information; and</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.2-sec.34-ssec.2-para1.b" guid="_41f4e061-d0bd-4ee2-87fa-7ec85c969397" provision.type="other"><no>(b)</no><block><txt break.before="0">that the chief executive is satisfied there is a reasonable suspicion that the approval was granted because of a false or misleading representation or declaration; and</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.2-sec.34-ssec.2-para1.c" guid="_2c685c52-7ad2-431a-b10d-9f27fe4a2b1c" provision.type="other"><no>(c)</no><block><txt break.before="0">that the circumstances relevant to the granting of the approval have changed; and</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.2-sec.34-ssec.2-para1.d" guid="_9e110840-3ab0-479f-ac1f-f02aa377e80b" provision.type="other"><no>(d)</no><block><txt break.before="0">that the approval has not been complied with; and</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.2-sec.34-ssec.2-para1.e" guid="_c413c6fb-5f81-4d0f-b080-e2e87b8f436a" provision.type="other"><no>(e)</no><block><txt break.before="0">that it is desirable to cancel or amend the approval having regard to the objects of this Act.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.2-div.2-sec.34-ssec.3" guid="_1f037256-ef21-4749-9f30-7d73d1b18866" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">Before cancelling or amending the approval (the <defterm id="sec.6-frag-ch.3-pt.2-div.2-sec.34-def.proposedaction" guid="_123642d5-ca19-4e77-b2e4-7eff6af3775d" type="definition">proposed action</defterm>), the chief executive must give the holder of the approval a notice stating the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.2-div.2-sec.34-ssec.3-para1.a" guid="_b28e2280-ef93-4eb0-9c10-ec60718b52df" provision.type="other"><no>(a)</no><block><txt break.before="0">the proposed action;</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.2-sec.34-ssec.3-para1.b" guid="_c99e0fd7-9b4d-4180-825c-23c4610c6967" provision.type="other"><no>(b)</no><block><txt break.before="0">the grounds for taking the proposed action;</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.2-sec.34-ssec.3-para1.c" guid="_6a6a2f81-1b7e-425b-9087-71bf17c0e838" provision.type="other"><no>(c)</no><block><txt break.before="0">the facts and circumstances that form the basis for the grounds;</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.2-sec.34-ssec.3-para1.d" guid="_4342edca-22bc-4caf-a13d-66fa2f079fbd" provision.type="other"><no>(d)</no><block><txt break.before="0">when the proposed action is intended to take effect;</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.2-sec.34-ssec.3-para1.e" guid="_1f0dbf34-4f05-48bc-b382-6928e7c2c204" provision.type="other"><no>(e)</no><block><txt break.before="0">that the holder may make, within a stated period, written submissions to show why the proposed action should not be taken.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.2-div.2-sec.34-ssec.4" guid="_e313b5b2-88e4-4770-ab52-e0e253004111" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">The stated period for submissions must not end earlier than 21 days after the holder of the approval is given the notice.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.2-div.2-sec.34-ssec.5" guid="_0908ac87-71ea-46f8-89d3-f18eb153d70b" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">The chief executive must consider all submissions made under subsection (3)(e) within the stated period.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.2-div.2-sec.34-ssec.6" guid="_5c032643-5b06-4a9f-aa00-81d589ce9729" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block><txt break.before="0">If the chief executive decides to take the proposed action, the chief executive must, within 10 business days after making the decision, give the holder of the approval an information notice for the decision.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.2-div.2-sec.34-ssec.7" guid="_678edf5d-14ca-42f8-9822-9741ad44581f" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block><txt break.before="0">The decision takes effect when the holder is given the information notice.</txt></block></subclause></clause></division><division id="sec.6-frag-ch.3-pt.2-div.3" guid="_9e829420-e978-4b83-ad69-79db10929afa" affected.by.uncommenced="0"><no>Division 3</no><heading id="sec.6-frag-ch.3-pt.2-div.3-he" guid="_574aa09c-7ba2-437e-b484-de807bc3b835">Declaring waste to be exempt waste</heading><clause id="sec.6-frag-ch.3-pt.2-div.3-sec.35" guid="_535d22f5-9b7d-4099-a339-3372cdde8a71" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>35</no><heading id="sec.6-frag-ch.3-pt.2-div.3-sec.35-he" guid="_a7f55820-fb78-4b73-a59e-b0ac7a7c9d11">Chief executive may declare waste to be exempt waste in exceptional circumstances</heading><subclause id="sec.6-frag-ch.3-pt.2-div.3-sec.35-ssec.1" guid="_dd052258-cf76-4b74-9a96-923678b5b247" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the chief executive is satisfied that exceptional circumstances apply for—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.2-div.3-sec.35-ssec.1-para1.a" guid="_c506d0b5-be2e-4fff-925a-0b23d9f7425c" provision.type="other"><no>(a)</no><block><txt break.before="0">particular waste or a type of waste; or</txt></block></li><li id="sec.6-frag-ch.3-pt.2-div.3-sec.35-ssec.1-para1.b" guid="_ae97dacc-9b61-432e-aad5-61cfe6c0da3f" provision.type="other"><no>(b)</no><block><txt break.before="0">the disposal of particular waste or a type of waste.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.2-div.3-sec.35-ssec.2" guid="_e990249c-ef3b-45b3-9dc0-90b4bf1f3ac9" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may, by publication on the department’s website, declare the waste to be exempt waste.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.2-div.3-sec.35-ssec.3" guid="_43c5e960-5489-43b1-ba4b-d3817aea5229" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive may declare waste to be exempt waste subject to any limits or conditions included in the declaration of the waste as exempt waste.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.2-div.3-sec.35-ssec.4" guid="_71c4842e-73d9-4b97-9795-84862e534df7" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">A declaration of waste as exempt waste has effect subject to any limits or conditions included in the declaration.</txt></block></subclause></clause></division></part><part id="sec.6-frag-ch.3-pt.3" guid="_005a043c-ec64-43a1-b9a5-5dfef8669843" affected.by.uncommenced="0"><no>Part 3</no><heading id="sec.6-frag-ch.3-pt.3-he" guid="_18f45a02-c8b5-4ed2-a282-d94551e9ed15">Operation of waste levy</heading><clause id="sec.6-frag-ch.3-pt.3-sec.36" guid="_7a8fbf1b-ece2-41a8-9eb9-085de67ba7d0" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>36</no><heading id="sec.6-frag-ch.3-pt.3-sec.36-he" guid="_6f2e29cb-ca08-49e0-bafa-a31b3468c08e">Imposition of waste levy</heading><block><txt break.before="1">The operator of a levyable waste disposal site is liable to pay the State a levy (the <defterm id="sec.6-frag-ch.3-pt.3-def.wastelevy" guid="_bd3b59d6-8d25-4dd5-8475-f120bddef0b1" type="definition">waste levy</defterm>) on all levyable waste that is delivered to the site if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.3-sec.36-para1.a" guid="_35f01296-afcf-481e-b2ca-4b2181ee879e" provision.type="other"><no>(a)</no><block><txt break.before="0">the levyable waste disposal site is in the waste levy zone; or</txt></block></li><li id="sec.6-frag-ch.3-pt.3-sec.36-para1.b" guid="_0f7dff86-5b86-4865-8568-b73ebf6ac9a0" provision.type="other"><no>(b)</no><block><txt break.before="0">the levyable waste disposal site is in the non-levy zone and the waste was generated outside the non-levy zone. </txt></block></li></list></block></clause><clause id="sec.6-frag-ch.3-pt.3-sec.37" guid="_ab63f8d0-b84a-4db3-a81d-d588bb5c17a6" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>37</no><heading id="sec.6-frag-ch.3-pt.3-sec.37-he" guid="_7c5db2bb-02c3-4178-b828-8309257937e9">Calculating waste levy amount</heading><subclause id="sec.6-frag-ch.3-pt.3-sec.37-ssec.1" guid="_25dcd458-68e8-45d1-a12a-b05b940225cd" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The rate of the waste levy for each type of waste is the rate prescribed by regulation for that type.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.3-sec.37-ssec.2" guid="_890a6baa-1f2e-415e-98d0-b618bb36e292" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The amount of waste levy imposed on waste is calculated in compliance with the requirements prescribed by regulation.</txt></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.3-sec.38" guid="_3a10be69-89f8-4e89-9f42-a3bb2ddd869b" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>38</no><heading id="sec.6-frag-ch.3-pt.3-sec.38-he" guid="_d854e4bd-8214-426c-9dd8-9e0657d2854a">Offence to remove waste from levyable waste disposal site in particular circumstances</heading><block><txt break.before="1">The operator of a levyable waste disposal site must not, for sale or other commercial gain, remove from the site waste for which the waste levy was, or is to be, paid to the State.</txt><penalty id="sec.6-frag-ch.3-pt.3-sec.38-pen" guid="_90c7759e-889c-4b6d-8b8d-f72882206e97"><block><txt break.before="1">Maximum penalty—50 penalty units.</txt></block></penalty></block></clause><clause id="sec.6-frag-ch.3-pt.3-sec.39" guid="_a7d6b58f-7c39-46fa-8ce9-0f61d53a548e" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>39</no><heading id="sec.6-frag-ch.3-pt.3-sec.39-he" guid="_7889e6a3-ff32-4855-8116-bbdc7310ced3">When residue waste taken to be generated outside the non-levy zone</heading><subclause id="sec.6-frag-ch.3-pt.3-sec.39-ssec" guid="_4212d0e7-f3b0-4d4b-83f4-e89e0a8db330" affected.by.uncommenced="0" provision.type="other"><block><txt break.before="0">If waste, used as feedstock for a recycling activity, was generated outside the non-levy zone, all of the residue waste generated by the recycling activity is taken, for this chapter, to be generated outside the non-levy zone.</txt></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.3-sec.40" guid="_4acec7e2-905b-4788-9e9d-311356518beb" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>40</no><heading id="sec.6-frag-ch.3-pt.3-sec.40-he" guid="_562f5f38-8a81-4f20-b1c3-76541daa9d34">Mixing waste generated outside non-levy zone with waste generated in the non-levy zone</heading><subclause id="sec.6-frag-ch.3-pt.3-sec.40-ssec.1" guid="_34776299-dc2c-4a43-aae1-e1ef3f345a7e" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if waste generated outside the non-levy zone is mixed with waste generated in the non-levy zone before being delivered to a levyable waste disposal site in the non-levy zone.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.3-sec.40-ssec.2" guid="_e51c64eb-8cc2-47ca-81c1-c08fc5a5f3bf" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive and the person who mixed the waste may agree in writing to a method of working out the waste that is taken to have been generated outside the non-levy zone and the total amount of that waste.</txt></block><note id="sec.6-frag-ch.3-pt.3-sec.40-ssec.2-note" guid="_73feb5e2-8a90-4d97-ba3b-4d9054198881" type="example"><heading id="sec.6-frag-ch.3-pt.3-sec.40-ssec.2-note-he" guid="_c06de81c-cf7a-4c5d-b6dd-3ff520d85cd8">Example—</heading><block><txt break.before="1">Fifty tonnes of waste generated outside the non-levy zone and 3,000 tonnes of waste generated in the non-levy zone are delivered to a resource recovery area in the non-levy zone in a month where they are mixed in a stockpile. Typically, 60% of waste delivered to the resource recovery area is delivered to the levyable waste disposal site. The chief executive and the operator of the relevant site agree that the first 30 tonnes of waste delivered from the resource recovery area to the levyable waste disposal site in the following month is taken to be waste generated outside the non-levy zone.</txt></block></note></subclause><subclause id="sec.6-frag-ch.3-pt.3-sec.40-ssec.3" guid="_c202f5f6-fd92-487b-ae33-b19f58c7a247" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">For this chapter— </txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.3-sec.40-ssec.3-para1.a" guid="_0a3166c2-cdd7-48dd-aff0-3f37f5066997" provision.type="other"><no>(a)</no><block><txt break.before="0">if there is an agreement under subsection (2)—the mixed waste is taken to be generated as decided under the agreement; or</txt></block></li><li id="sec.6-frag-ch.3-pt.3-sec.40-ssec.3-para1.b" guid="_63b301bb-59fe-4378-b98d-b197a3dc2f23" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—all the mixed waste is taken to have been generated outside the non-levy zone from the time the waste was mixed.</txt></block></li></list></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.3-sec.41" guid="_79bcc5d6-04e4-4282-9063-b52147a3981f" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>41</no><heading id="sec.6-frag-ch.3-pt.3-sec.41-he" guid="_6fcafc3c-ae3a-41f8-aeb8-2bb5d3b711c4">Mixing types of waste that attract different rates of waste levy</heading><subclause id="sec.6-frag-ch.3-pt.3-sec.41-ssec.1" guid="_fdf50f08-c417-4099-bcac-90c1092fc511" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.3-sec.41-ssec.1-para1.a" guid="_9b17b046-49ee-4e1a-b306-f413ed60da0e" provision.type="other"><no>(a)</no><block><txt break.before="0">different types of waste are mixed before being delivered to a levyable waste disposal site; and</txt></block></li><li id="sec.6-frag-ch.3-pt.3-sec.41-ssec.1-para1.b" guid="_4370e6cc-e941-4c6d-9ff1-f96665c9bf7c" provision.type="other"><no>(b)</no><block><txt break.before="0">the different types of waste attract different rates of waste levy.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.3-sec.41-ssec.1A" guid="_8f94c4a9-c6e6-4a9f-ba09-45ed9d01ae74" affected.by.uncommenced="0" provision.type="other"><no>(1A)</no><block><txt break.before="0">For subsection (1)(b), the rate of the waste levy for exempt waste is taken to be zero.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.3-sec.41-ssec.2" guid="_18f69dfc-7d31-46d7-9ff8-36f6d1d10dcb" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">All of the waste delivered is taken to attract the highest rate of waste levy that applies to any of the types of waste.</txt></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.3-sec.42" guid="_6b1b0fd6-f48d-4365-ac60-eb6a787050c7" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>42</no><heading id="sec.6-frag-ch.3-pt.3-sec.42-he" guid="_a90e62d3-b509-47f3-a9dc-b05cf44d8c34">Mixing types of waste that attract same rate of waste levy</heading><subclause id="sec.6-frag-ch.3-pt.3-sec.42-ssec.1" guid="_052f1f76-9532-48a7-9a70-4ab1dc781ea7" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.3-sec.42-ssec.1-para1.a" guid="_a1552092-b2c9-4831-9e37-265fc7a05f63" provision.type="other"><no>(a)</no><block><txt break.before="0">different types of waste are mixed before being delivered to a levyable waste disposal site; and</txt></block></li><li id="sec.6-frag-ch.3-pt.3-sec.42-ssec.1-para1.b" guid="_69236aa6-59e7-40dc-8846-628bba095804" provision.type="other"><no>(b)</no><block><txt break.before="0">the different types of waste attract the same rate of waste levy.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.3-sec.42-ssec.1A" guid="_464abe43-8ff5-4fff-a168-01369de6526d" affected.by.uncommenced="0" provision.type="other"><no>(1A)</no><block><txt break.before="0">For subsection (1)(b), the rate of the waste levy for exempt waste is taken to be zero.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.3-sec.42-ssec.2" guid="_27c86523-9db7-45c5-8810-1dafac358a43" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The operator of the site must, for sections 60 and 61, make a reasonable estimate of the amount of each type of waste included in the mixed waste using the information given to the operator under section 53.</txt></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.3-sec.43" guid="_e298a73e-da4c-49ab-a84e-005ab6317d50" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>43</no><heading id="sec.6-frag-ch.3-pt.3-sec.43-he" guid="_0c1aa564-f0b4-4cb8-ae35-33dea6e96e5d">Regulation identifying waste levy zone</heading><subclause id="sec.6-frag-ch.3-pt.3-sec.43-ssec.1" guid="_02ba7521-e875-4083-9bfb-47e717bfc060" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">A regulation may identify local government areas that make up the waste levy zone.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.3-sec.43-ssec.2" guid="_969f922c-8d63-4cf1-9d58-f6d0f5685242" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">To remove any doubt, it is declared that it is not necessary for the waste levy zone to be made up of only local government areas that are contiguous with other local government areas.</txt></block></subclause></clause></part><part id="sec.6-frag-ch.3-pt.4" guid="_0ec2ef9f-5948-45fa-8373-ef465d2b7080" affected.by.uncommenced="0"><no>Part 4</no><heading id="sec.6-frag-ch.3-pt.4-he" guid="_1e384107-4a05-4081-a8ae-ccb13ed56a0f">Discounting waste levy for residue waste</heading><clause id="sec.6-frag-ch.3-pt.4-sec.44" guid="_7515ab4f-74b9-4909-81f1-15e4697a7f10" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>44</no><heading id="sec.6-frag-ch.3-pt.4-sec.44-he" guid="_d457d466-447c-4954-9fd1-8490933bba11">Application for discounted rate for waste levy for residue waste</heading><subclause id="sec.6-frag-ch.3-pt.4-sec.44-ssec.1" guid="_5ba4f968-29f6-47f8-b0a2-f67a4fd1c52f" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">A person who conducts a recycling activity prescribed by regulation may apply to the chief executive for approval of a discounted rate for the waste levy for residue waste identified in the application (a <defterm id="sec.6-frag-ch.3-pt.4-sec.44-def.residuewastediscountingapplication" guid="_dbb01123-b44f-4ef1-97a4-dd3a061133d7" type="definition">residue waste discounting application</defterm>).</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.4-sec.44-ssec.2" guid="_1cd27b34-33d8-403a-9e27-91e3f5eb985b" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The application must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.4-sec.44-ssec.2-para1.a" guid="_ba0ab8c7-33b5-4ed2-8848-1b1f2ca90704" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li id="sec.6-frag-ch.3-pt.4-sec.44-ssec.2-para1.b" guid="_65288380-ab74-4e8e-a753-6e24656acc95" provision.type="other"><no>(b)</no><block><txt break.before="0">be supported by enough information to allow the chief executive to decide the application; and</txt></block></li><li id="sec.6-frag-ch.3-pt.4-sec.44-ssec.2-para1.c" guid="_be3b5be5-3a03-4ec9-a75f-80040ec223c3" provision.type="other"><no>(c)</no><block><txt break.before="0">be accompanied by the fee prescribed by regulation.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.4-sec.44-ssec.3" guid="_f2438421-855b-4eac-bef9-6544f5e7ddd8" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The Minister may recommend to the Governor in Council the making of a regulation under subsection (1) about a particular recycling activity only if the Minister is satisfied that—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.4-sec.44-ssec.3-para1.a" guid="_cc91a440-ab89-4892-98b3-7ef5c44732a7" provision.type="other"><no>(a)</no><block><txt break.before="0">	giving a discount on the waste levy for residue waste from the activity will have a significant impact on the activity becoming established and sustained in Queensland; and</txt></block></li><li id="sec.6-frag-ch.3-pt.4-sec.44-ssec.3-para1.b" guid="_f6ffce69-772f-432e-b50b-c7107c398f8a" provision.type="other"><no>(b)</no><block><txt break.before="0">	the activity optimises the market and material value that can be derived from the waste used as feedstock for the activity.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.4-sec.44-ssec.4" guid="_86802ae9-e6b6-4902-ba53-a9d92e4c2b53" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">The <defterm id="sec.6-frag-ch.3-pt.4-sec.44-def.discountedrate" guid="_ccff9394-49e6-4168-86cd-b681e1413d81" type="definition">discounted rate</defterm> for the waste levy for residue waste is the rate prescribed by regulation.</txt></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.4-sec.45" guid="_70155b81-84da-4a60-87ac-ac6623b67845" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>45</no><heading id="sec.6-frag-ch.3-pt.4-sec.45-he" guid="_8ded9779-30e5-47c1-bfd2-5b27b0bc0167">Chief executive may require additional information or documents</heading><subclause id="sec.6-frag-ch.3-pt.4-sec.45-ssec.1" guid="_74f3fcca-b74d-4adc-ab5c-fba39ae639d5" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">Within 28 days after receiving a residue waste discounting application, the chief executive may, by notice given to the applicant, require the applicant to give the chief executive further reasonable information or documents about the application by a reasonable day stated in the notice.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.4-sec.45-ssec.2" guid="_aa464ef9-c0f3-4ffa-8f71-ce6a4d9793d4" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The applicant may, before the stated day, agree with the chief executive about extending the time for providing the further information or documents.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.4-sec.45-ssec.3" guid="_d3a02329-571a-40a1-b005-f026d19299ee" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The application is taken to be withdrawn if the applicant does not give the chief executive the further information or documents by the stated day or the end of any extension agreed between the chief executive and the applicant.</txt></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.4-sec.46" guid="_759a9205-302e-4dc0-a4d9-ebd749bef94f" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>46</no><heading id="sec.6-frag-ch.3-pt.4-sec.46-he" guid="_db3d3ecf-8803-41c0-a2ca-cf5da1077c41">Deciding application</heading><subclause id="sec.6-frag-ch.3-pt.4-sec.46-ssec.1" guid="_d3717a2a-8277-4e5d-a903-419807d414aa" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must decide either to grant or to refuse a residue waste discounting application within 28 days after the later of the following days—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.4-sec.46-ssec.1-para1.a" guid="_949da84e-f2fe-4859-a0f3-b2e94970f8bf" provision.type="other"><no>(a)</no><block><txt break.before="0">the day the chief executive receives the application;</txt></block></li><li id="sec.6-frag-ch.3-pt.4-sec.46-ssec.1-para1.b" guid="_c1c99375-8a34-42a9-9e70-7b8f3ddd3f41" provision.type="other"><no>(b)</no><block><txt break.before="0">if additional information or documents are requested under section&#160;45—the day the chief executive receives the information or documents.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.4-sec.46-ssec.2" guid="_d12e9095-c45f-44ec-9a05-2c68ce9ff568" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">In deciding the application, the chief executive must consider all of the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.4-sec.46-ssec.2-para1.a" guid="_059428c1-aab6-4a40-ad8a-97c0f9ec47c9" provision.type="other"><no>(a)</no><block><txt break.before="0">the objects of this Act;</txt></block></li><li id="sec.6-frag-ch.3-pt.4-sec.46-ssec.2-para1.b" guid="_fb1c6464-873d-4b18-b7ee-9203e870b994" provision.type="other"><no>(b)</no><block><txt break.before="0">the information included in the application;</txt></block></li><li id="sec.6-frag-ch.3-pt.4-sec.46-ssec.2-para1.c" guid="_20db82cb-22ad-4160-9bd6-04ef3edfe661" provision.type="other"><no>(c)</no><block><txt break.before="0">any criteria prescribed by regulation;</txt></block></li><li id="sec.6-frag-ch.3-pt.4-sec.46-ssec.2-para1.d" guid="_dcf9f6bb-58b9-4838-b363-868e4b890055" provision.type="other"><no>(d)</no><block><txt break.before="0">the applicant’s history of compliance with this Act and the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261"><name emphasis="no">Environmental Protection Act</name></legref>, including whether the applicant holds any licences, environmental authorities or other approvals for conducting the recycling activity.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.4-sec.46-ssec.3" guid="_18722589-6b5d-4606-a74f-e7eeed0a89c4" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">However, the chief executive must refuse the application in the circumstances prescribed by regulation.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.4-sec.46-ssec.4" guid="_88b70f06-bd1e-4d5a-be97-dc4dca8d34be" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">A failure to make a decision within the period required is taken to be a decision by the chief executive to refuse the application.</txt></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.4-sec.47" guid="_9e9a454e-e886-47cd-9ab7-17e973cb2c45" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>47</no><heading id="sec.6-frag-ch.3-pt.4-sec.47-he" guid="_21d75ac4-516b-404f-b44e-fe1d0f54d5b1">Grant of application</heading><subclause id="sec.6-frag-ch.3-pt.4-sec.47-ssec.1" guid="_bc2693a7-09ee-4189-998f-2e3b218d1d30" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">If the chief executive grants a residue waste discounting application—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.4-sec.47-ssec.1-para1.a" guid="_d2d70f9e-e8ad-4944-b763-3c498d683f3a" provision.type="other"><no>(a)</no><block><txt break.before="0">in addition to any other conditions, the chief executive must impose a condition on the approval either—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.4-sec.47-ssec.1-para1.a-para2.i" guid="_7fcc3cce-800d-4db3-9612-a5a79d095484" provision.type="other"><no>(i)</no><block><txt break.before="0">	requiring the applicant to maintain as a minimum a stated recycling efficiency; or</txt></block></li><li id="sec.6-frag-ch.3-pt.4-sec.47-ssec.1-para1.a-para2.ii" guid="_8adcdb2d-c69e-4686-bb1d-0da96dbb1fef" provision.type="other"><no>(ii)</no><block><txt break.before="0">	limiting the amount of residue waste that will attract the discount rate in a period, including, for example, as a stated proportion of the amount of waste used as feedstock for the recycling activity in the period; and</txt></block></li></list></block></li><li id="sec.6-frag-ch.3-pt.4-sec.47-ssec.1-para1.b" guid="_f28f1fdd-3d0d-4f65-9b21-255c50a705f6" provision.type="other"><no>(b)</no><block><txt break.before="0">within 5 business days, the chief executive must give the applicant a notice stating the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.4-sec.47-ssec.1-para1.b-para2.i" guid="_e5f5d508-7e73-4782-87d9-5d11c751ed57" provision.type="other"><no>(i)</no><block><txt break.before="0">the application has been granted;</txt></block></li><li id="sec.6-frag-ch.3-pt.4-sec.47-ssec.1-para1.b-para2.ii" guid="_0ff1f250-053b-4c67-b1eb-b9dd92f8b430" provision.type="other"><no>(ii)</no><block><txt break.before="0">the discounted rate for the waste levy for the residue waste identified in the application;</txt></block></li><li id="sec.6-frag-ch.3-pt.4-sec.47-ssec.1-para1.b-para2.iii" guid="_a13cff5a-46b2-4a8b-97c4-4e87e83e9206" provision.type="other"><no>(iii)</no><block><txt break.before="0">the period of the approval;</txt></block></li><li id="sec.6-frag-ch.3-pt.4-sec.47-ssec.1-para1.b-para2.iv" guid="_9e811374-2232-4dcf-af79-54214a742222" provision.type="other"><no>(iv)</no><block><txt break.before="0">any conditions imposed on the approval or prescribed by regulation.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.4-sec.47-ssec.2" guid="_c5afd76d-8789-45e1-8f33-0084c99a7156" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The period of the approval must not—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.4-sec.47-ssec.2-para1.a" guid="_0ffad6e6-4632-4316-8303-082ef25ee564" provision.type="other"><no>(a)</no><block><txt break.before="0">be more than 3 years; or</txt></block></li><li id="sec.6-frag-ch.3-pt.4-sec.47-ssec.2-para1.b" guid="_39f937a9-ebb1-49bd-8461-9767211feaad" provision.type="other"><no>(b)</no><block><txt break.before="0">end after the residue waste discounting review date.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.4-sec.47-ssec.3" guid="_73ad0387-8d44-4d55-99fe-3ee738dc7b32" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The notice must also include or be accompanied by an information notice for the decision to impose a condition on the approval unless the condition is the same, or substantially the same, as a condition agreed to or asked for by the applicant.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.4-sec.47-ssec.4" guid="_462f4a91-7f74-4081-a0db-89c76b0958d9" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">In addition to any conditions imposed by the chief executive, the approval is also subject to the conditions prescribed by regulation.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.4-sec.47-ssec.5" guid="_2db61780-f24e-441e-90bf-55edfead30d0" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sec.6-frag-ch.3-pt.4-sec.47-ssec.5-def.recyclingefficiency_" guid="_6169ee35-f3c1-4a98-85f8-f1565c99a2af" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.4-sec.47-ssec.5-def.recyclingefficiency" guid="_4a294b85-cd8c-47e8-8ec2-1d359a0e82a7" type="definition">recycling efficiency</defterm> means a percentage of the feedstock for a recycling activity that is not disposed of as landfill as a result of the activity.</txt></definition><definition id="sec.6-frag-ch.3-pt.4-sec.47-ssec.5-def.residuewastediscountingreviewdate_" guid="_48c69444-91cf-4cc9-a9ec-daace559ec7f" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.4-sec.47-ssec.5-def.residuewastediscountingreviewdate" guid="_a03c48ca-5f37-46e4-a645-aab2264112c0" type="definition">residue waste discounting review date</defterm> means the day, as prescribed by regulation, for the review by the chief executive of the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.4-sec.47-ssec.5-def.residuewastediscountingreviewdate-para1.a" guid="_eabc1ecb-93cf-4912-9ba6-6738a687175b" provision.type="other"><no>(a)</no><block><txt break.before="0">the discounted rate for the waste levy for the residue waste;</txt></block></li><li id="sec.6-frag-ch.3-pt.4-sec.47-ssec.5-def.residuewastediscountingreviewdate-para1.b" guid="_f031f989-5659-490e-8ee9-3d7aab91afc0" provision.type="other"><no>(b)</no><block><txt break.before="0">the recycling efficiency threshold for recycling activities;</txt></block></li><li id="sec.6-frag-ch.3-pt.4-sec.47-ssec.5-def.residuewastediscountingreviewdate-para1.c" guid="_7d608667-e38e-4422-8efb-0de25bd94016" provision.type="other"><no>(c)</no><block><txt break.before="0">any other matters mentioned in this part as being prescribed by regulation.</txt></block></li></list></definition></deflist></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.4-sec.48" guid="_def5ea13-39c0-4998-bf22-7139317eee6b" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>48</no><heading id="sec.6-frag-ch.3-pt.4-sec.48-he" guid="_0d2a938f-4654-44c0-9639-4e2ccf53766e">Refusal of application</heading><block><txt break.before="1">If the chief executive refuses a residue waste discounting application, the chief executive must, within 5 business days after refusing the application, give the applicant an information notice for the decision.</txt></block></clause><clause id="sec.6-frag-ch.3-pt.4-sec.49" guid="_df63a51d-da49-4d4f-a424-eb48e475de10" affected.by.uncommenced="0" spent.amends="0" provision.type="amend"><no>49</no><heading id="sec.6-frag-ch.3-pt.4-sec.49-he" guid="_9efdacac-89f0-4797-af07-5308ae030830">Amendment of approval by agreement</heading><subclause id="sec.6-frag-ch.3-pt.4-sec.49-ssec.1" guid="_9515b720-59b5-4790-881b-98d302e3ed45" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may amend an approval of a discounted rate for the waste levy for residue waste by agreement between the chief executive and the holder of the approval.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.4-sec.49-ssec.2" guid="_bd1c8e00-3f61-4546-bd9a-10890e6a036d" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">If the holder of the approval asks for the amendment, the request must be accompanied by the fee prescribed by regulation.</txt></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.4-sec.50" guid="_d0b49648-5426-4f00-9ad0-52695a6df581" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>50</no><heading id="sec.6-frag-ch.3-pt.4-sec.50-he" guid="_d6df4b9e-2860-47fc-9b09-ca815ba22235">Cancellation or amendment of approval by chief executive</heading><subclause id="sec.6-frag-ch.3-pt.4-sec.50-ssec.1" guid="_8cee9163-8f9e-4ed7-9c0d-295136fd6ebe" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may cancel or amend an approval of a discounted rate for the waste levy for residue waste if the chief executive considers there are reasonable grounds to cancel or amend it.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.4-sec.50-ssec.2" guid="_3c2ec307-24fc-4d43-9992-2466fb6324c3" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting subsection&#160;(1), the grounds for cancelling or amending the approval may include—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.4-sec.50-ssec.2-para1.a" guid="_da42a270-c3b8-4762-a3a3-0d5d189df43f" provision.type="other"><no>(a)</no><block><txt break.before="0">that the chief executive is satisfied there is a reasonable suspicion that the holder of the approval has not implemented strategies or practices to progressively improve the efficiency of the holder’s recycling activities during the period of the approval; and</txt></block></li><li id="sec.6-frag-ch.3-pt.4-sec.50-ssec.2-para1.b" guid="_6c6c69b7-7124-48f1-8a02-f18fb81913ab" provision.type="other"><no>(b)</no><block><txt break.before="0">that the chief executive is satisfied there is a reasonable suspicion that the approval was granted because of a false or misleading representation or declaration; and</txt></block></li><li id="sec.6-frag-ch.3-pt.4-sec.50-ssec.2-para1.c" guid="_8d78f4e3-3603-49bf-ae44-c49704daae4b" provision.type="other"><no>(c)</no><block><txt break.before="0">that the circumstances relevant to the granting of the approval have changed; and</txt></block></li><li id="sec.6-frag-ch.3-pt.4-sec.50-ssec.2-para1.d" guid="_50ecacf1-da0d-455b-a365-e00357a9bd80" provision.type="other"><no>(d)</no><block><txt break.before="0">that the conditions of the approval have not been complied with; and</txt></block></li><li id="sec.6-frag-ch.3-pt.4-sec.50-ssec.2-para1.e" guid="_3ca267b4-fb1c-4ef8-8162-208961965222" provision.type="other"><no>(e)</no><block><txt break.before="0">that it is desirable to cancel or amend the approval having regard to the objects of this Act.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.4-sec.50-ssec.3" guid="_65c544c1-d306-4514-87a9-95a6da69acb8" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">Before cancelling or amending the approval (the <defterm id="sec.6-frag-ch.3-pt.4-sec.50-def.proposedaction" guid="_787b1548-2a48-4722-85f4-2b71e5a4fd4a" type="definition">proposed action</defterm>) the chief executive must give the holder of the approval a notice stating the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.4-sec.50-ssec.3-para1.a" guid="_7c086da2-8d46-4462-9205-579bf64d5e8e" provision.type="other"><no>(a)</no><block><txt break.before="0">the proposed action;</txt></block></li><li id="sec.6-frag-ch.3-pt.4-sec.50-ssec.3-para1.b" guid="_84911b96-3638-40d7-81df-761196ba67c7" provision.type="other"><no>(b)</no><block><txt break.before="0">the grounds for taking the proposed action;</txt></block></li><li id="sec.6-frag-ch.3-pt.4-sec.50-ssec.3-para1.c" guid="_7c2db525-eb77-41d6-a4a4-e5b7f43601eb" provision.type="other"><no>(c)</no><block><txt break.before="0">the facts and circumstances that form the basis for the grounds;</txt></block></li><li id="sec.6-frag-ch.3-pt.4-sec.50-ssec.3-para1.d" guid="_ca2caa87-9d63-4da6-b810-0c160793a2f6" provision.type="other"><no>(d)</no><block><txt break.before="0">when the proposed action is intended to take effect;</txt></block></li><li id="sec.6-frag-ch.3-pt.4-sec.50-ssec.3-para1.e" guid="_75258039-0937-4b7c-ae9c-7093e3348dd2" provision.type="other"><no>(e)</no><block><txt break.before="0">that the holder of the approval may make, within a stated period, written submissions to show why the proposed action should not be taken.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.4-sec.50-ssec.4" guid="_3b02608f-8a65-4ecf-833f-bdfa9053a40b" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">The stated period for submissions must not end earlier than 21 days after the holder of the approval is given the notice.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.4-sec.50-ssec.5" guid="_d3f4afdd-a30b-4239-82e0-ba6e7cd4430e" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">The chief executive must consider all submissions made under subsection (3)(e) within the stated period.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.4-sec.50-ssec.6" guid="_c5bee7ea-cb57-4c38-81b6-f20ef5b91c2c" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block><txt break.before="0">If the chief executive decides to take the proposed action, the chief executive must, within 10 business days after making the decision, give the holder of the approval an information notice for the decision.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.4-sec.50-ssec.7" guid="_9beca1f6-0456-49e1-ba61-c8469c644315" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block><txt break.before="0">The decision takes effect when the holder is given the information notice.</txt></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.4-sec.51" guid="_8fba645d-38f2-49df-a23f-01b6eef7ac59" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>51</no><heading id="sec.6-frag-ch.3-pt.4-sec.51-he" guid="_5cbba695-6510-4034-a1d5-b862d5979023">Automatic cancellation of approval</heading><block><txt break.before="1">An approval of a discounted rate for the waste levy for residue waste is automatically cancelled if the business of conducting the recycling activity relevant to the approval ceases to be owned by the entity granted the approval, including, for example, because the ownership of the business is transferred to another entity.</txt></block></clause></part><part id="sec.6-frag-ch.3-pt.5" guid="_7239cc3d-b178-4135-b57f-c2749bc2ff56" affected.by.uncommenced="0"><no>Part 5</no><heading id="sec.6-frag-ch.3-pt.5-he" guid="_c3cf7150-89da-446e-b857-901c8100265d">Obligations relating to waste levy</heading><division id="sec.6-frag-ch.3-pt.5-div.1" guid="_c43c708b-96ad-462e-a0d2-f41f107a56b0" affected.by.uncommenced="0"><no>Division 1</no><heading id="sec.6-frag-ch.3-pt.5-div.1-he" guid="_a34e0585-ce3a-43c6-92c9-876e41a2163f">Obligations of person delivering waste</heading><clause id="sec.6-frag-ch.3-pt.5-div.1-sec.52" guid="_b9f7e94f-f718-4fad-b451-987a69aa05cb" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>52</no><heading id="sec.6-frag-ch.3-pt.5-div.1-sec.52-he" guid="_54d94210-175d-4efc-9354-dfcfed3997aa">Persons delivering waste </heading><block><txt break.before="0">A person is taken to deliver waste for this division if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.1-sec.52-para1.a" guid="_e649b088-ea56-493b-bc7d-c8b6086035d7" provision.type="other"><no>(a)</no><block><txt break.before="0">the person physically delivers the waste; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.1-sec.52-para1.b" guid="_138b51a0-dec9-4bed-9d73-0edbbb8e2efe" provision.type="other"><no>(b)</no><block><txt break.before="0">the person engages or directs another person to physically deliver the waste on behalf of the person.</txt><note id="sec.6-frag-ch.3-pt.5-div.1-sec.52-para1.b-note" guid="_50f38ac7-c614-4979-8507-c445a3411dfe" type="example"><heading id="sec.6-frag-ch.3-pt.5-div.1-sec.52-para1.b-note-he" guid="_f89b2151-32aa-45b7-af39-fb32ccfa9c6d">Example—</heading><block><txt break.before="1">If an employee delivers waste to a levyable waste disposal site on behalf of the employee’s employer, the obligations under this division apply to both the employee and the employer.</txt></block></note></block></li></list></block></clause><clause id="sec.6-frag-ch.3-pt.5-div.1-sec.53" guid="_aff58045-8251-4926-a174-a652e1fef455" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>53</no><heading id="sec.6-frag-ch.3-pt.5-div.1-sec.53-he" guid="_85e6db7d-4a9c-42c8-96c2-62e8a5e79fea">Person delivering waste to waste disposal site to give information</heading><subclause id="sec.6-frag-ch.3-pt.5-div.1-sec.53-ssec.1" guid="_62a273a1-29e7-48a3-802f-61656555bad9" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a person delivers waste to a waste disposal site.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.1-sec.53-ssec.2" guid="_645abe68-80e9-4ca4-a7d3-b89efa794c0d" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The person must give the operator of the waste disposal site the information (the <defterm id="sec.6-frag-ch.3-pt.5-div.1-sec.53-def.deliveryinformation" guid="_d50749d8-6af9-4da3-b4d6-0a9c1cb8816c" type="definition">delivery information</defterm>) that the operator reasonably requires to identify—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.1-sec.53-ssec.2-para1.a" guid="_aa17a286-6f70-4be6-ab5f-2d36754af79d" provision.type="other"><no>(a)</no><block><txt break.before="0">how much of the waste is exempt waste and how much of it is levyable waste; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.1-sec.53-ssec.2-para1.b" guid="_07f66523-e911-4b5b-9dfd-46bcd74ae4e5" provision.type="other"><no>(b)</no><block><txt break.before="0">for each type of waste required to be measured by the operator under section 59—how much waste there is; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.1-sec.53-ssec.2-para1.c" guid="_72383fb8-e578-4317-89a3-e54c8708fed7" provision.type="other"><no>(c)</no><block><txt break.before="0">whether the waste was generated in the waste levy zone, the non-levy zone or outside Queensland.</txt></block></li></list></block><penalty id="sec.6-frag-ch.3-pt.5-div.1-sec.53-ssec.2-pen" guid="_03f2cf82-0966-4907-8815-c0930ee6683f"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.1-sec.53-ssec.3" guid="_7cf0a014-c08b-419e-a76e-67d3b9909eec" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, the delivery information must be given to the operator at least 24 hours before the waste is delivered if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.1-sec.53-ssec.3-para1.a" guid="_100a8f97-4820-4a7b-96ab-7f1ac9907870" provision.type="other"><no>(a)</no><block><txt break.before="0">the waste disposal site is in the non-levy zone; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.1-sec.53-ssec.3-para1.b" guid="_c731a8a1-479a-4a21-9451-00dc6f205330" provision.type="other"><no>(b)</no><block><txt break.before="0">the waste was generated outside the non-levy zone; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.1-sec.53-ssec.3-para1.c" guid="_dc207b6d-7098-43b2-a75c-1110ee4e166e" provision.type="other"><no>(c)</no><block><txt break.before="0">the waste is delivered in a vehicle with a GCM or GVM of more than 4.5 tonnes.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.1-sec.53-ssec.4" guid="_b013e3ec-15d9-479f-8b1d-8cdf3c8e4cfd" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">However, subsections (2) and (3) do not apply to the person if the person knows the operator already has the delivery information when the information would otherwise be required under subsection (2) or (3).</txt><note id="sec.6-frag-ch.3-pt.5-div.1-sec.53-ssec.4-note" guid="_00ffb69e-08c1-418b-8167-5cd772ce60ed" type="example"><heading id="sec.6-frag-ch.3-pt.5-div.1-sec.53-ssec.4-note-he" guid="_415e3d0a-e654-4922-ae28-73fe943b1df3">Example—</heading><block><txt break.before="1">The person delivering the waste is acting on behalf of another person and knows that the other person has already given the delivery information.</txt></block></note></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.1-sec.53-ssec.5" guid="_4554d3e2-139d-4643-bd07-110033ca1754" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">If the operator of the waste disposal site asks the person to give the operator the delivery information in the approved form, the person must comply with the request unless the person has a reasonable excuse.</txt></block><penalty id="sec.6-frag-ch.3-pt.5-div.1-sec.53-ssec.5-pen" guid="_a0df157c-820e-48e0-b776-194a897b0ebc"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.1-sec.53-ssec.6" guid="_7f6d6ed2-a90f-4893-9c81-2d2cb5e3c12b" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block><txt break.before="0">If a person (the <defterm id="sec.6-frag-ch.3-pt.5-div.1-sec.53-def.principal" guid="_0adf6cb8-898f-4f84-9330-1f3b2aee9769" type="definition">principal</defterm>) engages or directs another person to deliver waste on behalf of the principal, it is a defence for subsection (2) or (5) for the principal to prove—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.1-sec.53-ssec.6-para1.a" guid="_7d84fe5f-0ade-49c7-8a89-81aa5635b539" provision.type="other"><no>(a)</no><block><txt break.before="0">the principal gave the other person appropriate instructions; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.1-sec.53-ssec.6-para1.b" guid="_ffa7f1b6-e02a-4731-b17b-5f2926d80c52" provision.type="other"><no>(b)</no><block><txt break.before="0">the principal used all reasonable precautions to ensure the other person complied with this section; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.1-sec.53-ssec.6-para1.c" guid="_09f72ca6-e7de-4da7-9328-47ce7a8b9ee0" provision.type="other"><no>(c)</no><block><txt break.before="0">the principal could not by the exercise of reasonable diligence have stopped the commission of the offence.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.1-sec.53-ssec.7" guid="_e3aed7c9-559b-458d-8244-71c3403fa62e" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block><txt break.before="0">Nothing in this section prevents the person from giving delivery information for more than 1 consignment of waste to be delivered to the waste disposal site.</txt></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.5-div.1-sec.54" guid="_2c388410-4d12-40fd-9aa0-9b205a6f730c" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>54</no><heading id="sec.6-frag-ch.3-pt.5-div.1-sec.54-he" guid="_4d786f8e-45db-4ab5-b1aa-0df2bdaa607f">Person delivering particular waste to give information</heading><subclause id="sec.6-frag-ch.3-pt.5-div.1-sec.54-ssec.1" guid="_75fe59c9-ac41-4ec6-9cad-30f3a260c186" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.1-sec.54-ssec.1-para1.a" guid="_7992dcbe-e14d-417e-bd12-ca33415f00b0" provision.type="other"><no>(a)</no><block><txt break.before="0">a person delivers waste to—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.1-sec.54-ssec.1-para1.a-para2.i" guid="_4c6eda12-4f45-4051-bb20-93eac29ed8fd" provision.type="other"><no>(i)</no><block><txt break.before="0">a resource recovery and transfer facility in the non-levy zone; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.1-sec.54-ssec.1-para1.a-para2.ii" guid="_687cc3aa-a3b1-4284-8c55-8c7ffb995489" provision.type="other"><no>(ii)</no><block><txt break.before="0">an entity conducting a recycling activity in the non-levy zone; and</txt></block></li></list></block></li><li id="sec.6-frag-ch.3-pt.5-div.1-sec.54-ssec.1-para1.b" guid="_07ac97e0-04c5-4d48-8bee-a419d7cfe76c" provision.type="other"><no>(b)</no><block><txt break.before="0">the waste was generated outside the non-levy zone; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.1-sec.54-ssec.1-para1.c" guid="_d560191f-9c3e-4397-9f32-041e96c555cf" provision.type="other"><no>(c)</no><block><txt break.before="0">the person delivers the waste in a vehicle with a GCM or GVM of more than 4.5 tonnes.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.1-sec.54-ssec.2" guid="_5d9a73cc-1152-4eb9-af2e-68bbf0774ff2" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The person must, at least 24 hours before delivering the waste, give the operator of the resource recovery and transfer facility or entity the information (the <defterm id="sec.6-frag-ch.3-pt.5-div.1-sec.54-def.deliveryinformation" guid="_3b5f3430-c514-4bb8-b1f9-473db8ec28ef" type="definition">delivery information</defterm>) that the operator or entity reasonably requires to identify—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.1-sec.54-ssec.2-para1.a" guid="_6dfc2ff5-5d2b-4287-a4e2-56d33398c51b" provision.type="other"><no>(a)</no><block><txt break.before="0">how much of the waste is exempt waste and how much of it is levyable waste; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.1-sec.54-ssec.2-para1.b" guid="_fefdefe1-fe08-49c2-967a-77095827fecc" provision.type="other"><no>(b)</no><block><txt break.before="0">whether the waste was generated in the waste levy zone or outside Queensland.</txt></block></li></list></block><penalty id="sec.6-frag-ch.3-pt.5-div.1-sec.54-ssec.2-pen" guid="_e2c402d2-96e5-4cc6-86c2-500f4298cabb"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.1-sec.54-ssec.3" guid="_f2b7ce4d-6f2d-4f7d-a1a1-0ba7a3981652" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">However, subsection (2) does not apply to the person if the person knows the operator or entity already has the delivery information when it is required under that subsection.</txt><note id="sec.6-frag-ch.3-pt.5-div.1-sec.54-ssec.3-note" guid="_4078eb38-5a82-4b26-b8bf-0c8beadae162" type="example"><heading id="sec.6-frag-ch.3-pt.5-div.1-sec.54-ssec.3-note-he" guid="_f138b28f-9dbf-4619-95e4-57abd5419bee">Example—</heading><block><txt break.before="1">The person delivering the waste to a resource recovery and transfer facility is the operator of the facility.</txt></block></note></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.1-sec.54-ssec.4" guid="_238a6f41-5e3c-4954-a7e2-c1d79b88cb2e" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">If the operator or entity asks the person to give the delivery information to the operator or entity in the approved form, the person must comply with the request unless the person has a reasonable excuse.</txt></block><penalty id="sec.6-frag-ch.3-pt.5-div.1-sec.54-ssec.4-pen" guid="_3349b5b2-72a9-4773-aa3b-2273f7331da6"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.1-sec.54-ssec.5" guid="_ffd1d49b-0e07-4723-807d-5b7575519845" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">If a person (the <defterm id="sec.6-frag-ch.3-pt.5-div.1-sec.54-def.principal" guid="_1813ea5c-350d-4461-a999-76039ce44d4e" type="definition">principal</defterm>) engages or directs another person to deliver waste on behalf of the principal, it is a defence for subsections (2) and (4) for the principal to prove—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.1-sec.54-ssec.5-para1.a" guid="_1fd744ca-f60e-498e-904f-920b70e1c1c2" provision.type="other"><no>(a)</no><block><txt break.before="0">the principal gave the other person appropriate instructions; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.1-sec.54-ssec.5-para1.b" guid="_e6b3762c-9f08-47bd-9b99-e28b63a13bf7" provision.type="other"><no>(b)</no><block><txt break.before="0">the principal used all reasonable precautions to ensure the other person complied with this section; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.1-sec.54-ssec.5-para1.c" guid="_6595861a-caa1-4786-ad9f-8c6fd825d6a2" provision.type="other"><no>(c)</no><block><txt break.before="0">the principal could not by the exercise of reasonable diligence have stopped the commission of the offence.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.1-sec.54-ssec.6" guid="_5e3c020f-dde3-4120-a0ef-ed9344a824fd" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block><txt break.before="0">Nothing in this section prevents the person from giving delivery information for more than 1 consignment of waste to be delivered to the resource recovery and transfer facility or to the entity.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.1-sec.54-ssec.7" guid="_da48eee0-ea28-4997-81f0-a76ffc734d90" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sec.6-frag-ch.3-pt.5-div.1-sec.54-ssec.7-def.resourcerecoveryandtransferfacility_" guid="_0eb7ee9b-b4d6-4226-827f-073d38cb93f4" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.5-div.1-sec.54-ssec.7-def.resourcerecoveryandtransferfacility" guid="_d9c6d9ff-a30f-4cf6-9ba3-fd9b31d616be" type="definition">resource recovery and transfer facility</defterm> means a facility used for—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.1-sec.54-ssec.7-def.resourcerecoveryandtransferfacility-para1.a" guid="_97ef95d8-a6f3-4280-ae87-035467cfbe98" provision.type="other"><no>(a)</no><block><txt break.before="0">receiving, sorting, dismantling or baling waste; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.1-sec.54-ssec.7-def.resourcerecoveryandtransferfacility-para1.b" guid="_e09bdcbe-b4f8-4284-a250-9a350c615eff" provision.type="other"><no>(b)</no><block><txt break.before="0">storing waste before moving it, from the site where the relevant activity is carried out, for recycling, processing, treatment or disposal.</txt></block></li></list></definition></deflist></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.5-div.1-sec.55" guid="_3c3e5b07-f208-4aba-94c9-28d0f9bf50bf" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>55</no><heading id="sec.6-frag-ch.3-pt.5-div.1-sec.55-he" guid="_5d91a0b1-b76d-45e4-bdb9-95ec5aa686e7">Giving false or misleading information when delivering waste</heading><subclause id="sec.6-frag-ch.3-pt.5-div.1-sec.55-ssec.1" guid="_bbf79c34-5839-4daa-a4c3-81eedefbb2be" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to a person delivering waste to—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.1-sec.55-ssec.1-para1.a" guid="_0e985e85-6db3-4e30-abe5-33130d08f740" provision.type="other"><no>(a)</no><block><txt break.before="0">a waste disposal site; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.1-sec.55-ssec.1-para1.b" guid="_32205092-265e-48da-839a-cac24e6d6765" provision.type="other"><no>(b)</no><block><txt break.before="0">a resource recovery and transfer facility in the non-levy zone; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.1-sec.55-ssec.1-para1.c" guid="_c3fdd170-66ab-4d48-b574-ca723a62bd7d" provision.type="other"><no>(c)</no><block><txt break.before="0">an entity conducting a recycling activity in the non-levy zone.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.1-sec.55-ssec.2" guid="_27aabaa8-c904-43db-a98a-a5c38e97de17" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The person must not give the operator or entity information about the waste that the person knows is false or misleading in a material particular.</txt></block><penalty id="sec.6-frag-ch.3-pt.5-div.1-sec.55-ssec.2-pen" guid="_ee5733dd-cfcd-48bf-bdac-e5a59c36ba48"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.1-sec.55-ssec.3" guid="_ccae5ae3-dd40-4704-bab5-30a9b758b971" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">However, subsection (2) does not apply to the person if the person, when giving information in a document—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.1-sec.55-ssec.3-para1.a" guid="_b5d1cd09-1803-4e32-b5cc-bff6c67de884" provision.type="other"><no>(a)</no><block><txt break.before="0">tells the operator or entity, to the best of the person’s ability, how the document is false or misleading; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.1-sec.55-ssec.3-para1.b" guid="_0313deb1-ea3e-49a6-bfeb-cca0228a9f1f" provision.type="other"><no>(b)</no><block><txt break.before="0">if the person has, or can reasonably obtain, the correct information—gives the correct information.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.1-sec.55-ssec.4" guid="_1557b31a-1a93-4ad2-b72d-30e22f03c314" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">To remove any doubt, it is declared that subsection (2) applies to any information whether or not the person is required to give the information under section 53 or 54.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.1-sec.55-ssec.5" guid="_9e0b892f-c6e5-4ad7-add0-0a993794eba3" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sec.6-frag-ch.3-pt.5-div.1-sec.55-ssec.5-def.operator_" guid="_aa4b49d2-9cd5-4636-bba0-3ffd6295fddd" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.5-div.1-sec.55-ssec.5-def.operator" guid="_74cd47ef-677d-4776-83f6-c10e991168ee" type="definition">operator</defterm> means the operator of the waste disposal site or resource recovery and transfer facility.</txt></definition><definition id="sec.6-frag-ch.3-pt.5-div.1-sec.55-ssec.5-def.resourcerecoveryandtransferfacility_" guid="_0c255abc-6792-4ef8-bb3d-6229eb24fb58" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.5-div.1-sec.55-ssec.5-def.resourcerecoveryandtransferfacility" guid="_892de632-6ee8-42be-8763-7d7803e62a01" type="definition">resource recovery and transfer facility</defterm> see section 54(7).</txt></definition></deflist></block></subclause></clause></division><division id="sec.6-frag-ch.3-pt.5-div.2" guid="_0721b8d9-5e73-4b38-bace-8cbb3e774485" affected.by.uncommenced="0"><no>Division 2</no><heading id="sec.6-frag-ch.3-pt.5-div.2-he" guid="_18336e9e-634c-4f74-8618-506629baf59e">Obligations of operators of waste disposal sites</heading><subdivision id="sec.6-frag-ch.3-pt.5-div.2-sdiv.1" guid="_5147e273-aa45-4f3e-a28a-c7d408f230eb" affected.by.uncommenced="0"><no>Subdivision 1</no><heading id="sec.6-frag-ch.3-pt.5-div.2-sdiv.1-he" guid="_71db28a8-bd91-43a7-86f5-6b192318bb25">Remitting waste levy</heading><clause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.1-sec.56" guid="_be7e833e-d61b-40b4-a070-18d769de1192" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>56</no><heading id="sec.6-frag-ch.3-pt.5-div.2-sdiv.1-sec.56-he" guid="_64063b22-1208-4d1e-a431-10f11c8170fd">Remitting waste levy amount to the State</heading><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.1-sec.56-ssec.1" guid="_0a3910a7-f28f-46ec-bec5-5a45c582c265" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">After receiving a summary data return from the operator of a levyable waste disposal site under section 72, the chief executive must give the operator an invoice stating the total amount of all waste levy amounts payable to the State by the operator for the levy period to which the return relates.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.1-sec.56-ssec.2" guid="_21998d03-d019-4e15-b42f-43648dd8070d" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The operator must pay to the chief executive the total amount stated in the invoice by the due date for payment of the amount.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.1-sec.56-ssec.3" guid="_6b9516bc-1b15-4cd3-91b4-88546d3cc712" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">If a waste levy amount owing by an operator remains unpaid after its due date for payment, interest is payable on the unpaid amount for each day starting on the day after the due date for payment and ending on the day the amount is actually paid.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.1-sec.56-ssec.4" guid="_90360a94-4a14-42e6-b1ff-c5fd5a54352c" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">The interest payable for a day as mentioned in subsection (3) is payable at the same rate as that applying to unpaid tax under the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-2001-072" target.version.series="c1d96fab-286c-4edf-8f6b-a43ce10deaba"><name emphasis="yes">Taxation Administration Act 2001</name></legref>, section 54 and the <legref jurisd="QLD" type="subordleg" check="valid" target.doc.id="sl-2012-0134" target.version.series="edcac6b9-d400-46e7-9c0e-56c246202eb6"><name emphasis="yes">Taxation Administration Regulation 2012</name>, section 8.</legref></txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.1-sec.56-ssec.5" guid="_0309a392-97b9-45d1-b281-20cea60bd3f7" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">Any waste levy amount payable by the operator of a levyable waste disposal site and remaining unpaid after its due date for payment, and any interest payable on the unpaid amount, may be recovered by the chief executive in a court with jurisdiction for the recovery of the amount as a debt payable by the operator to the State.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.1-sec.56-ssec.6" guid="_9ea920a7-5c8a-447a-9173-974ba964f243" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sec.6-frag-ch.3-pt.5-div.2-sdiv.1-sec.56-ssec.6-def.summarydatareturn_" guid="_1075b392-7e54-477c-b8bd-ada25f0892bf" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.5-div.2-sdiv.1-sec.56-ssec.6-def.summarydatareturn" guid="_ad0af98c-ba21-4645-a71d-5c3d3971adf4" type="definition">summary data return</defterm> see section 72(5).</txt></definition></deflist></block></subclause></clause></subdivision><subdivision id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2" guid="_38b56f58-3966-4a05-aeaf-9248eabe38c1" affected.by.uncommenced="0"><no>Subdivision 2</no><heading id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-he" guid="_8b1ac515-f627-4fcf-992b-65217d3b6843">Weighbridges</heading><clause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.57" guid="_f5a60e4d-3e52-4769-ad1c-e9117a09b0d8" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>57</no><heading id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.57-he" guid="_ed30f273-9b50-43f9-a321-dc61a88d49c0">Weighbridge required</heading><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.57-ssec.1" guid="_fc6b5810-4b5f-4e4f-926d-dfc08ea82c3f" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a waste disposal site in the waste levy zone must ensure a weighbridge is installed at the site from the beginning of the day on—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.57-ssec.1-para1.a" guid="_d4bc48cb-0dba-49f9-9be2-5397415e51fb" provision.type="other"><no>(a)</no><block><txt break.before="0">if the operator is required to hold an environmental authority for the disposal of more than 10,000 tonnes of waste in a year at the site—1 July 2019; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.57-ssec.1-para1.b" guid="_dd947f7c-bb72-4d6b-adfa-03880ec62fb6" provision.type="other"><no>(b)</no><block><txt break.before="0">if the operator is required to hold an environmental authority for the disposal of more than 5,000 tonnes, but not more than 10,000 tonnes, of waste in a year at the site—1 July 2021; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.57-ssec.1-para1.c" guid="_d7dbc108-a868-454e-b207-e6ed4326b84f" provision.type="other"><no>(c)</no><block><txt break.before="0">for any other operator—1 July 2024.</txt></block></li></list></block><penalty id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.57-ssec.1-pen" guid="_bed8a340-c5d7-479d-96e6-f7199ba494c4"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.57-ssec.2" guid="_846a8867-8f24-45b8-916c-c12a42c1d36e" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">If a waste disposal site is in the non-levy zone and receives during the period from 1 July 2019 to 31 December 2019 at least 300 tonnes of levyable waste generated outside the non-levy zone, the operator must ensure a weighbridge is installed at the site by 30 June 2020.</txt></block><penalty id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.57-ssec.2-pen" guid="_8f292e27-0124-499a-98c4-889205f5b033"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.57-ssec.3" guid="_1f8a9486-6404-45c7-8aa3-d79df8ba8851" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">From 1 January 2020, if a waste disposal site is in the non-levy zone and receives at least 600 tonnes of levyable waste generated outside the non-levy zone during a year, the operator must ensure a weighbridge is installed at the site by 30 June in the following year.</txt></block><penalty id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.57-ssec.3-pen" guid="_7d715bf1-e3f7-4c98-825b-b746dc92daad"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause></clause><clause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.58" guid="_8d918cb2-6be4-41ea-9a94-8ee3370eb7e9" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>58</no><heading id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.58-he" guid="_4c92bcf4-0dd3-4c05-a835-782784c0d888">Weighbridge requirements</heading><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.58-ssec.1" guid="_8d369824-2094-452c-9457-0920b4680e06" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the operator of a waste disposal site at which a weighbridge is installed.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.58-ssec.2" guid="_28072837-c164-4490-b16d-969eeb8b8df6" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The operator must ensure that—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.58-ssec.2-para1.a" guid="_157e9a99-5699-4788-b494-cb7f918ba0a4" provision.type="other"><no>(a)</no><block><txt break.before="0">the installation and operation of the weighbridge complies with the requirements prescribed by regulation for the weighbridge; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.58-ssec.2-para1.b" guid="_529662e3-6fc2-4294-bc15-053dbcbc4df0" provision.type="other"><no>(b)</no><block><txt break.before="0">the weighbridge is kept in proper working order; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.58-ssec.2-para1.c" guid="_e503bc7c-b799-4d57-b8c9-cdcd03e0542f" provision.type="other"><no>(c)</no><block><txt break.before="0">a copy of any record of certification for the weighbridge obtained in complying with the <legref jurisd="QLD" type="act" check="invalid"><name emphasis="yes">National Measurement Act 1960</name> (Cwlth)</legref> is kept by the operator for 5 years after the certification.</txt></block></li></list><penalty id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.58-ssec.2-pen" guid="_525bd8cf-7dce-4787-86f9-61e4690a85df"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.58-ssec.3" guid="_42f13c74-793d-4a20-b5a4-c41b3e74d3ed" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">If the weighbridge is out of operation, the operator must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.58-ssec.3-para1.a" guid="_67e49362-d156-4007-9c3d-c37bce0ec949" provision.type="other"><no>(a)</no><block><txt break.before="0">bring the weighbridge back into operation in the shortest practicable time; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.58-ssec.3-para1.b" guid="_ab8aab4b-de8b-423f-bcd7-bc4e89d7e6ed" provision.type="other"><no>(b)</no><block><txt break.before="0">keep a written record detailing the period for which the weighbridge was out of operation and the reason it was out of operation.</txt></block></li></list><penalty id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.58-ssec.3-pen" guid="_363298ae-949f-4aa6-9e3c-e62850d951f2"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.58-ssec.4" guid="_c547fb8d-c464-4ffd-832f-9570c181844d" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">Further, if the weighbridge is out of operation for a period of more than 24 hours, the operator must notify the chief executive of the following details within 3 days after the weighbridge first became out of operation, whether or not the weighbridge is still out of operation—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.58-ssec.4-para1.a" guid="_f88ca8d1-c874-4732-a243-abc805a6b69c" provision.type="other"><no>(a)</no><block><txt break.before="0">the event that resulted in the weighbridge being out of operation;</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.58-ssec.4-para1.b" guid="_5e92bb5a-39e3-4b73-a24b-87b25b99023e" provision.type="other"><no>(b)</no><block><txt break.before="0">when the weighbridge first became out of operation;</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.58-ssec.4-para1.c" guid="_cf8d5a4a-2265-400a-91dc-39a85f51f522" provision.type="other"><no>(c)</no><block><txt break.before="0">whether the weighbridge is still out of operation;</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.58-ssec.4-para1.d" guid="_79fea6ce-b99b-46f2-91f3-08f18b9ae1e4" provision.type="other"><no>(d)</no><block><txt break.before="0">if the weighbridge is still out of operation—what actions are being taken to bring the weighbridge back into operation.</txt></block></li></list><penalty id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.58-ssec.4-pen" guid="_673ae4de-758f-45bf-90b7-cbadcaedf6c8"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.58-ssec.5" guid="_0761aebb-059a-4dbe-bced-30a9a45e605a" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">If the weighbridge is still out of operation when the chief executive is notified under subsection (4), the operator must notify the chief executive of its being brought back into operation within 3 days after it starts operating again.</txt><penalty id="sec.6-frag-ch.3-pt.5-div.2-sdiv.2-sec.58-ssec.5-pen" guid="_0e8e79a2-8de4-4a3c-9495-50be3ac21596"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></block></subclause></clause></subdivision><subdivision id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3" guid="_0e2ab4c4-25a5-4238-b3ff-958d215b9fa1" affected.by.uncommenced="0"><no>Subdivision 3</no><heading id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-he" guid="_fac7d161-8908-4e88-b00e-864303c8d3ba">Measurement of waste</heading><clause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.59" guid="_d06e8d4b-60ea-4fa6-86b6-d4c1d0b80eae" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>59</no><heading id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.59-he" guid="_1fbe1d3b-b96d-4707-945a-47852d6f7aff">When waste or other material must be measured</heading><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.59-ssec.1" guid="_0a1877a3-f21f-46c1-a925-e9a5a058caf6" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">Waste, or an amount of other material that is more than 1 tonne, is required to be measured if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.59-ssec.1-para1.a" guid="_b2de7e55-9ce8-4944-b5b6-00c1353f6b75" provision.type="other"><no>(a)</no><block><txt break.before="0">it is delivered to a levyable waste disposal site; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.59-ssec.1-para1.b" guid="_74d7b35d-bf7a-453b-a8f6-45f7f25e8e72" provision.type="other"><no>(b)</no><block><txt break.before="0">after being delivered to a levyable waste disposal site, it is moved to a place outside the site; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.59-ssec.1-para1.c" guid="_4ad7518a-2c70-411d-b294-47c5d3115e2c" provision.type="other"><no>(c)</no><block><txt break.before="0">it is delivered in a vehicle with a GCM or GVM of more than 4.5 tonnes to a resource recovery area for a waste disposal site; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.59-ssec.1-para1.d" guid="_2ebc3c4d-b3b0-4eb2-8d73-4a68ecf5fcba" provision.type="other"><no>(d)</no><block><txt break.before="0">after being delivered to a resource recovery area for a waste disposal site—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.59-ssec.1-para1.d-para2.i" guid="_f4b5782f-c279-4df0-a4cb-1bad4bf2e599" provision.type="other"><no>(i)</no><block><txt break.before="0">it is moved from the area to any other part of the site; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.59-ssec.1-para1.d-para2.ii" guid="_1d8d1b7e-2cdd-4945-b4d8-279e3e5aaf36" provision.type="other"><no>(ii)</no><block><txt break.before="0">it is moved to a place outside the site in a vehicle with a GCM or GVM of more than 4.5 tonnes.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.59-ssec.2" guid="_bf90e4b7-6d7a-42b1-b116-c76d7aaf53de" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">Subsection (1) does not apply in relation to a levyable waste disposal site in the non-levy zone if the operator of the site—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.59-ssec.2-para1.a" guid="_d363ca10-6af6-4343-b3ef-d66f21fb2214" provision.type="other"><no>(a)</no><block><txt break.before="0">is required to hold an environmental authority for the disposal of not more than 5,000 tonnes of waste in a year at the site; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.59-ssec.2-para1.b" guid="_3de0c279-fcaf-4c7d-8493-1c1609ddd5d8" provision.type="other"><no>(b)</no><block><txt break.before="0">has taken all reasonable practical steps to ensure that levyable waste generated at a place outside the non-levy zone can not be lawfully delivered to the site.</txt></block></li></list></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.60" guid="_a4837f1b-a62b-4397-943d-09bd3d0c68cc" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>60</no><heading id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.60-he" guid="_287cbdb2-5968-4715-b33f-4316194747dd">Measurement of waste by weighbridge</heading><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.60-ssec.1" guid="_7cb63bf2-d5c7-4887-9dca-9f811e479aea" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a weighbridge is installed at a waste disposal site, whether or not it is required under section 57.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.60-ssec.2" guid="_ddfa79de-3c20-4912-b902-ad2334687a8b" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">Each time waste or other material is required to be measured under section 59, the operator of the waste disposal site must ensure the weighbridge is used to measure and record the waste or other material.</txt></block><penalty id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.60-ssec.2-pen" guid="_2f64ee8c-640b-4e29-ae97-411982ee9830"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty><note id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.60-ssec.2-note" guid="_91a4e430-5701-49f7-9823-ddc3595c4096" type="example"><heading id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.60-ssec.2-note-he" guid="_1140a749-2937-4fcd-b3db-a6cff57e2f39">Note—</heading><block><txt break.before="1">See also section 42.</txt></block></note></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.60-ssec.3" guid="_e8c46beb-3937-43a9-b75b-9e0085fdc9f8" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">However, if it is not practicable to use the weighbridge to measure and record a particular amount of waste or other material, the operator may measure and record the waste in the way the operator and the chief executive agree to in writing.</txt></block><note id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.60-ssec.3-note" guid="_fc4cd9c6-e3b6-42c1-90df-7a071a31b223" type="example"><heading id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.60-ssec.3-note-he" guid="_a78d4f27-c210-45c7-80e8-c7a63161d5bb">Examples of something that is impracticable to weigh using a weighbridge—</heading><block><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.60-ssec.3-note-para1" guid="_f7fd9325-961c-45a6-90d4-0bf7aa2c5259" provision.type="other"><no>•</no><block><txt break.before="0">a large aircraft</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.60-ssec.3-note-para1-oc.2" guid="_66ed6acd-febc-4812-ac18-7f51aab5a353" provision.type="other"><no>•</no><block><txt break.before="0">a large amount of waste that is taken to be delivered to the levyable part of a waste disposal site because of a cancellation or revocation of the declaration of the resource recovery area</txt></block></li></list></block></note></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.60-ssec.4" guid="_9dec292d-daba-409a-8051-b8c9e4be3839" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">The operator of the waste disposal site must ensure a record made under subsection (2) includes the information required by the chief executive.</txt></block><penalty id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.60-ssec.4-pen" guid="_b4f58f6c-55e6-41e7-b7b6-ff5675bc61ef"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.60-ssec.5" guid="_ae9bd12a-aca8-48a7-bb9e-575f669dc62c" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">The information required by the chief executive under subsection (4) must be published on the department’s website and may include only—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.60-ssec.5-para1.a" guid="_5e25996e-4cae-4cb8-a389-5d1ae79e8160" provision.type="other"><no>(a)</no><block><txt break.before="0">the type of waste or other material; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.60-ssec.5-para1.b" guid="_55320c02-60fd-4b0a-b273-de02f0a30083" provision.type="other"><no>(b)</no><block><txt break.before="0">whether the waste was generated in the waste levy zone, the non-levy zone or outside Queensland; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.60-ssec.5-para1.c" guid="_da59d6bc-f9e5-4c2e-ac5c-576aa2f570fb" provision.type="other"><no>(c)</no><block><txt break.before="0">details of any exemption or discount applying to the waste; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.60-ssec.5-para1.d" guid="_d75b7a48-b7f8-4810-b8dd-7285d6be34fe" provision.type="other"><no>(d)</no><block><txt break.before="0">the vehicle used to move the waste or other material.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.60-ssec.6" guid="_9e64c8d0-5407-4244-8c05-8204d736c96f" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block><txt break.before="0">If the weighbridge is not in operation when an amount of waste or other material is required to be measured under section 59, the operator of the waste disposal site must ensure the waste or other material is measured and recorded in compliance with the weight measurement criteria.</txt></block><penalty id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.60-ssec.6-pen" guid="_0d951a2a-394f-4ccc-830c-36f6b8a19fca"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause></clause><clause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.61" guid="_f9c71a36-2655-494e-ada6-5c2e513a6b67" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>61</no><heading id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.61-he" guid="_3364cfd2-2260-4474-a427-744f5baf784c">Measurement of waste other than by weighbridge</heading><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.61-ssec.1" guid="_0170dcdd-f209-4f5e-b319-f07016aa25cd" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if a weighbridge is not installed at a waste disposal site.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.61-ssec.2" guid="_3412b0b9-beba-4382-8b5d-4a80a58f45fb" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">Each time waste or other material is required to be measured under section 59, the operator of the waste disposal site must ensure the waste or other material is measured and recorded in compliance with the weight measurement criteria.</txt></block><penalty id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.61-ssec.2-pen" guid="_3f891b88-c0e8-46a9-a596-e2c13f4e82fc"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty><note id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.61-ssec.2-note" guid="_5a97cd75-cec2-41bd-94b7-6e340c4b74f9" type="example"><heading id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.61-ssec.2-note-he" guid="_fc5938d0-5f14-46d9-8443-9015122f4603">Note—</heading><block><txt break.before="1">See also section 42.</txt></block></note></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.61-ssec.3" guid="_a40a4f9e-82cc-41e3-9031-bf9caafe2249" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The operator of the waste disposal site must ensure a record made under subsection (2) includes the information required by the chief executive.</txt></block><penalty id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.61-ssec.3-pen" guid="_9694e45e-9953-4401-a62a-40d902af35d2"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.61-ssec.4" guid="_b39d84cf-dd99-47a0-aeca-7d073bacc01b" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">The information required by the chief executive under subsection (3) must be published on the department’s website and may include only—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.61-ssec.4-para1.a" guid="_d93c249d-1aee-4cdd-844e-8c1162b44b6d" provision.type="other"><no>(a)</no><block><txt break.before="0">the type of waste or material; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.61-ssec.4-para1.b" guid="_c0f70e66-398e-4c74-915a-c10d9d4f39db" provision.type="other"><no>(b)</no><block><txt break.before="0">whether the waste was generated in the waste levy zone, the non-levy zone or outside Queensland; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.61-ssec.4-para1.c" guid="_e388a82c-8404-47e4-a0d2-fb93c44f77ed" provision.type="other"><no>(c)</no><block><txt break.before="0">details of any exemption or discount applying to the waste; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.3-sec.61-ssec.4-para1.d" guid="_78cb51c9-a551-4980-a79d-0b2940b59911" provision.type="other"><no>(d)</no><block><txt break.before="0">the vehicle used to move the waste or material.</txt></block></li></list></block></subclause></clause></subdivision><subdivision id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4" guid="_2a189f7d-b0a7-4bdf-bea1-22c29e624086" affected.by.uncommenced="0"><no>Subdivision 4</no><heading id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-he" guid="_4735ef05-b6fb-4de1-8003-0cf4195ba755">Monitoring system</heading><clause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.62" guid="_4cc8596b-7943-4262-998e-86757ef7056c" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>62</no><heading id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.62-he" guid="_b9ef9e41-1749-4281-97d3-57d8afe91484">What is a <defterm id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.62-def.monitoringsystem" guid="_1cbe9386-3bca-45e6-b88d-27c8ac0698af" type="definition">monitoring system</defterm></heading><block><txt break.before="0">A <defterm id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-def.monitoringsystem" guid="_9e2538dd-69a9-41cb-911b-dc8030eec285" type="definition">monitoring system</defterm> is a closed-circuit television or another system the chief executive approves as a monitoring system by publishing details of the system on the department’s website.</txt></block></clause><clause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.63" guid="_caa398e7-0f3e-4dab-b7d3-d2549b31ee3b" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>63</no><heading id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.63-he" guid="_e2e2676b-0b07-46a9-8625-9ab56ead7444">When monitoring system may be required by chief executive</heading><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.63-ssec.1" guid="_60057ee5-7223-4293-a72c-4f69f0a2451c" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the chief executive reasonably believes the operator of a waste disposal site has not complied with the operator’s obligation under this chapter to pay the waste levy or give the chief executive a waste data return for the site.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.63-ssec.2" guid="_4329bfe4-c91a-4ceb-b394-26551a66ca8b" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may, by notice given to the operator, require the operator to install, maintain and operate a monitoring system at the site to record vehicle movements at the locations (each a <defterm id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.63-def.monitoringpoint" guid="_10ac3248-e7d7-4855-95d9-244cf9c435c5" type="definition">monitoring point</defterm>) stated in the notice.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.63-ssec.3" guid="_8ac91d28-73d3-4c51-a915-e3be575b5cd4" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The notice must also—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.63-ssec.3-para1.a" guid="_3381bca6-6c3a-457e-8e62-d51c91ae57ec" provision.type="other"><no>(a)</no><block><txt break.before="0">state the day by which the monitoring system must be installed; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.63-ssec.3-para1.b" guid="_44df1bdb-cad0-4444-8e3f-c148c9bfee0a" provision.type="other"><no>(b)</no><block><txt break.before="0">include or be accompanied by an information notice for the chief executive’s decision to give the notice.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.63-ssec.4" guid="_13f4a3e7-3fa8-4592-8058-b83ebf807d18" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">The operator must comply with the notice.</txt></block><penalty id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.63-ssec.4-pen" guid="_2dc9d4d4-2ef2-427b-a04d-cc4fbe1f75af"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause></clause><clause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64" guid="_89604380-1e3f-4cd2-a934-ff456e26fd5b" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>64 </no><heading id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-he" guid="_89cd708c-a471-4b0d-9c5f-759cf22b2f06">Requirements for monitoring system</heading><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.1" guid="_7ebd6a53-2acf-47a8-941a-35107f19850b" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the operator of a waste disposal site given a notice under section 63 requiring the operator to install, maintain and operate a monitoring system.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.2" guid="_2db406c9-c898-4410-9158-f9839c77d754" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The operator must comply with the obligations stated in subsections (3) and (5).</txt></block><penalty id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.2-pen" guid="_edec615c-7086-497a-a839-2246e52ba318"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.3" guid="_783230c0-0274-443f-b9be-5ab02bafb1c2" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The operator must— </txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.3-para1.a" guid="_93907748-8140-4fe4-ba16-4032d71c9fa5" provision.type="other"><no>(a)</no><block><txt break.before="0">display signage at the waste disposal site in a way that is likely to make persons arriving at the site aware that a monitoring system is installed at the site; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.3-para1.b" guid="_385e1ec2-2a60-4d51-996b-75aa3beb1ca5" provision.type="other"><no>(b)</no><block><txt break.before="0">ensure the monitoring system—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.3-para1.b-para2.i" guid="_3311b2e7-4dac-4342-8564-60a16e7174d4" provision.type="other"><no>(i)</no><block><txt break.before="0">meets the minimum requirements prescribed by regulation for the system; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.3-para1.b-para2.ii" guid="_612edeb8-b1cc-48a5-80aa-2e3b8d0e61f1" provision.type="other"><no>(ii)</no><block><txt break.before="0">is kept in proper working order; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.3-para1.b-para2.iii" guid="_118edcfa-3d52-4db6-bcb4-506d0cfe58cd" provision.type="other"><no>(iii)</no><block><txt break.before="0">records vehicles at each monitoring point in a way that identifies the vehicles; and</txt><note id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.3-para1.b-para2.iii-note" guid="_ba7c35e8-be13-4057-a9ce-238a835d3778" type="example"><heading id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.3-para1.b-para2.iii-note-he" guid="_982cb007-826c-4fb8-b48a-3905572e2ee1">Example of a way that identifies a vehicle—</heading><block><txt break.before="1">an image of the vehicle’s registration</txt></block></note></block></li></list></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.3-para1.c" guid="_3c3da2ab-62de-49ec-8e2a-fdf154364821" provision.type="other"><no>(c)</no><block><txt break.before="0">comply with any requirements prescribed by regulation about maintaining the monitoring system; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.3-para1.d" guid="_b4b8c8db-98a1-4a1b-9f74-7eb7215f7b0c" provision.type="other"><no>(d)</no><block><txt break.before="0">store each recording in a secure place at the premises in compliance with any requirements prescribed by regulation for the storage; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.3-para1.e" guid="_4d2adf26-297a-4bb6-8d81-0dc1161fabda" provision.type="other"><no>(e)</no><block><txt break.before="0">keep each recording available for inspection by an authorised person at the premises until the recording is erased or destroyed in compliance with paragraph (f); and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.3-para1.f" guid="_4caf34cd-d0fd-48d1-870b-3aa9ec24657f" provision.type="other"><no>(f)</no><block><txt break.before="0">ensure a recording—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.3-para1.f-para2.i" guid="_74edc8e6-9f38-42d5-94d6-4d1796450108" provision.type="other"><no>(i)</no><block><txt break.before="0">is only erased or destroyed by the operator or a person approved by the operator; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.3-para1.f-para2.ii" guid="_5d0cc4ca-d6f6-4f2b-bda5-eb9b8f54da22" provision.type="other"><no>(ii)</no><block><txt break.before="0">is not erased or destroyed earlier than 60 days after it was made; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.3-para1.f-para2.iii" guid="_037d027f-b999-4be0-af1a-8114cca115d1" provision.type="other"><no>(iii)</no><block><txt break.before="0">is erased or destroyed no later than 90 days after it was made.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.4" guid="_512c3a13-63b3-4738-8e1e-19fed30e5368" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">However, if a copy of a recording is given to an authorised person, the recording—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.4-para1.a" guid="_d456faf8-5270-43da-b56f-22f91096785f" provision.type="other"><no>(a)</no><block><txt break.before="0">need only be kept available for inspection by an authorised person until the authorised person has confirmed by written notice that the recording is viewable; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.4-para1.b" guid="_ae8c88a7-9987-4788-8842-c4f232b3c3dd" provision.type="other"><no>(b)</no><block><txt break.before="0">may be destroyed once the authorised person has confirmed by written notice that the recording is viewable.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.5" guid="_eaed2555-b5f7-4485-ad4c-9b5f213a971c" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">The operator must not—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.5-para1.a" guid="_e4feba36-e899-4a67-965f-d1d84cf16418" provision.type="other"><no>(a)</no><block><txt break.before="0">allow the monitoring system to be operated by anyone other than—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.5-para1.a-para2.i" guid="_a5021310-48b3-4fbb-8f2b-77eb8a61ee3a" provision.type="other"><no>(i)</no><block><txt break.before="0">the operator of the site; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.5-para1.a-para2.ii" guid="_0418187c-9258-434c-af1f-7b9ed2d36b64" provision.type="other"><no>(ii)</no><block><txt break.before="0">a person approved by the operator; or</txt></block></li></list></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.5-para1.b" guid="_cfae88df-1172-4fbc-8671-5320c2d5311a" provision.type="other"><no>(b)</no><block><txt break.before="0">allow a recording to be viewed by anyone other than an authorised person or a person mentioned in paragraph (a).</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.6" guid="_1e41bf55-4e15-4ad2-8a16-af80c5bc0b62" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.6-def.monitoringpoint_" guid="_69e670e7-06a8-4694-879f-181357a28627" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.6-def.monitoringpoint" guid="_0ac8b46f-1a74-4bb3-850e-8dc742a93554" type="definition">monitoring point</defterm> means a monitoring point under section 63(2).</txt></definition><definition id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.6-def.recording_" guid="_e4c16453-6180-444f-b084-aaef7689c458" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.64-ssec.6-def.recording" guid="_374bef04-86c8-4a51-80cf-f93933497ce1" type="definition">recording</defterm> means a video recording made by the monitoring system.</txt></definition></deflist></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.65" guid="_80cc8d74-beb5-4cbe-bd8c-6d6835c61942" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>65</no><heading id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.65-he" guid="_a055d91a-808a-4210-a127-aa0c642cac81">Requirements if monitoring system stops operating</heading><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.65-ssec.1" guid="_ba9920bc-07ab-4c51-9552-d2f30047e8fc" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the operator of a waste disposal site given a notice under section 63 requiring the operator to install, maintain and operate a monitoring system.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.65-ssec.2" guid="_820dbb86-a861-4a8e-80e2-dccd26d82c5f" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">If the monitoring system stops recording, the operator must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.65-ssec.2-para1.a" guid="_14eadfb0-4f9e-410a-8f7e-a540606fdae3" provision.type="other"><no>(a)</no><block><txt break.before="0">bring the system back into operation in the shortest practicable time; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.65-ssec.2-para1.b" guid="_262bc240-30ed-4596-90a9-d5b82cc40f25" provision.type="other"><no>(b)</no><block><txt break.before="0">keep a written record detailing the period within which the system was not recording and the reason it was not recording.</txt></block></li></list></block><penalty id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.65-ssec.2-pen" guid="_24359ec4-98e8-45a0-a1dc-00109b59d8a4"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.65-ssec.3" guid="_5bb2e9ae-46ae-4904-a5c1-92143e6c080a" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">Further, if any event results in the monitoring system not recording for any period of more than 24 hours, the operator must notify the chief executive of the following details within 3 days after the system stops recording, whether or not the system is still not recording—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.65-ssec.3-para1.a" guid="_57d3a3ba-813c-4b92-bdc1-bc646078d671" provision.type="other"><no>(a)</no><block><txt break.before="0">the event that resulted in the monitoring system not recording;</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.65-ssec.3-para1.b" guid="_323d1992-a1fe-4fda-9510-28795ea9d923" provision.type="other"><no>(b)</no><block><txt break.before="0">when the monitoring system stopped recording;</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.65-ssec.3-para1.c" guid="_0bc4da3d-5cd7-41ff-a21b-16b3f9dc506d" provision.type="other"><no>(c)</no><block><txt break.before="0">whether the monitoring system is still not recording;</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.65-ssec.3-para1.d" guid="_9798c011-5bdd-4e8f-a0aa-840aa8ba4895" provision.type="other"><no>(d)</no><block><txt break.before="0">if the monitoring system is still not recording—what actions are being taken to bring the monitoring system back into operation.</txt></block></li></list></block><penalty id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.65-ssec.3-pen" guid="_71f9a562-6dd2-4556-8bba-31052c408bd8"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.65-ssec.4" guid="_964e36f1-f50c-41bc-aec4-a5a7543c05c9" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">If the monitoring system is still not recording when the chief executive is notified under subsection (3) but later starts recording again, the operator must notify the chief executive that it is recording again within 3 days after it starts recording.</txt></block><penalty id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.65-ssec.4-pen" guid="_1133f78a-7742-49ce-bd57-c6c6207c419d"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></subclause></clause><clause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.66" guid="_d6403f78-1984-4603-a95f-67b05c011ee6" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>66</no><heading id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.66-he" guid="_213a297c-2d59-45f8-9aef-50b6ebf31403">Operators required to give chief executive plan for monitoring system</heading><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.66-ssec.1" guid="_400aa06e-7729-4707-a867-82833ce4b747" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the operator of a waste disposal site given a notice under section 63 requiring the operator to install, maintain and operate a monitoring system.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.66-ssec.2" guid="_466fa2c7-a0b8-4f18-9fd6-9f137168f7ef" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The operator must give the chief executive a plan for the monitoring system complying with subsection (3) within 21 days after the day the operator is required under the notice to install the monitoring system.</txt></block><penalty id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.66-ssec.2-pen" guid="_964d1fa8-979c-456c-8d16-7774ad481c8b"><block><txt break.before="1">Maximum penalty—40 penalty units.</txt></block></penalty></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.66-ssec.3" guid="_08539643-2333-4a16-ac19-68bdc8cd2bd0" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The plan for the monitoring system must contain a diagram of the system indicating the following in relation to the waste disposal site—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.66-ssec.3-para1.a" guid="_2c946ba4-6035-4ba9-a9a6-be6fdf78dae2" provision.type="other"><no>(a)</no><block><txt break.before="0">how the components that comprise the system have been positioned;</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.4-sec.66-ssec.3-para1.b" guid="_c4c8e2b7-652a-4b0e-8235-369785228483" provision.type="other"><no>(b)</no><block><txt break.before="0">the scope of the coverage of recordings by the system.</txt></block></li></list></block></subclause></clause></subdivision><subdivision id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5" guid="_d8f98863-534f-49e1-82a0-ffc027e3b97d" affected.by.uncommenced="0"><no>Subdivision 5</no><heading id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-he" guid="_21ea256b-f2e7-4241-b86b-29671d275eb7">Volumetric surveys</heading><clause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.67" guid="_bcb78d89-1066-4e8e-8f15-1fd48c24aef5" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>67</no><heading id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.67-he" guid="_e7c0a364-bcd5-48b2-8e09-d336e47ddf40">Volumetric survey for levyable waste disposal site in waste levy zone</heading><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.67-ssec.1" guid="_bd0926ff-2b3f-4960-a96c-ecfa51d9a7e0" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">From 1 June 2020, the operator of a levyable waste disposal site in the waste levy zone must, in each year, in compliance with the requirements for volumetric surveys under section 70—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.67-ssec.1-para1.a" guid="_4b741046-7267-47c5-93a1-cf46ab616864" provision.type="other"><no>(a)</no><block><txt break.before="0">ensure that a volumetric survey is carried out in June for—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.67-ssec.1-para1.a-para2.i" guid="_85fdf39d-3b37-46b9-9db7-4e655b771cc2" provision.type="other"><no>(i)</no><block><txt break.before="0">each landfill cell where waste has been disposed of since the last volumetric survey required under this subdivision was carried out; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.67-ssec.1-para1.a-para2.ii" guid="_c078768b-331e-4415-a909-dc456e17b183" provision.type="other"><no>(ii)</no><block><txt break.before="0">all stockpiled waste at the site; and</txt></block></li></list></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.67-ssec.1-para1.b" guid="_d5ef6ac6-2007-45fa-a7bd-a3333aca2289" provision.type="other"><no>(b)</no><block><txt break.before="0">give the chief executive a copy of the results of the volumetric surveys required under paragraph (a) before the end of July.</txt></block></li></list></block><penalty id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.67-ssec.1-pen" guid="_049e8fa6-992a-4f2f-a2a9-97ee45366512"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.67-ssec.2" guid="_09239d2a-aee3-451d-b50e-b9245b161354" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">This section continues to apply to the operator—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.67-ssec.2-para1.a" guid="_9e4ddd82-9ec2-4cd9-9160-3a6d9723e31f" provision.type="other"><no>(a)</no><block><txt break.before="0">regardless of whether waste may no longer be delivered to the site; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.67-ssec.2-para1.b" guid="_254f955a-93b1-4b6d-b718-ee75b9586ffd" provision.type="other"><no>(b)</no><block><txt break.before="0">even if the site ceases to be a levyable waste disposal site.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.67-ssec.3" guid="_f7c13819-4431-4f47-9a2e-6a2bc0f72719" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">However, if a matter mentioned in subsection (2) happens, the carrying out of the survey and the giving of a copy of the results to the chief executive may happen earlier than when otherwise required under subsection (1).</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.67-ssec.4" guid="_e487d7c4-8cfb-4c32-b6dd-11ea9aea5875" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">This section does not apply to a small site until 1 June 2022.</txt></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.68" guid="_18476f7d-c810-4209-849e-c2c14cd10d72" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>68</no><heading id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.68-he" guid="_b4ebea14-3fd3-46f6-94f9-54b719831405">Volumetric survey for levyable waste disposal site in non-levy zone in particular circumstances</heading><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.68-ssec.1" guid="_04d26200-de46-40fb-9cd6-9ee3ef442bcd" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the operator of a levyable waste disposal site if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.68-ssec.1-para1.a" guid="_5ea4f8f4-673c-496c-8dfe-1b1509b855e3" provision.type="other"><no>(a)</no><block><txt break.before="0">the site is in the non-levy zone; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.68-ssec.1-para1.b" guid="_63bcaf21-374b-4487-8212-0f025134a88e" provision.type="other"><no>(b)</no><block><txt break.before="0">either—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.68-ssec.1-para1.b-para2.i" guid="_e31d51ca-b334-466c-92f5-8c106838d9ba" provision.type="other"><no>(i)</no><block><txt break.before="0">from 1 July 2019 to 31 December 2019—at least 300 tonnes of levyable waste, generated outside the non-levy zone, is received at the site; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.68-ssec.1-para1.b-para2.ii" guid="_61ef7d14-9965-40c7-a097-e45aeb807cc4" provision.type="other"><no>(ii)</no><block><txt break.before="0">from 1 January 2020—at least 600 tonnes of levyable waste, generated outside the non-levy zone, is received at the site during a year.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.68-ssec.2" guid="_9da026d5-e039-4386-8783-5e337ddad57c" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The operator of the levyable waste disposal site must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.68-ssec.2-para1.a" guid="_a0f4a9b1-dafa-4be7-88b7-531efef4199f" provision.type="other"><no>(a)</no><block><txt break.before="0">ensure that a volumetric survey is carried out between 1 January and 30 June of the following year for—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.68-ssec.2-para1.a-para2.i" guid="_608bee0f-cb95-4cf9-aefa-a4822e832a59" provision.type="other"><no>(i)</no><block><txt break.before="0">each <b>active</b> landfill cell at the site; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.68-ssec.2-para1.a-para2.ii" guid="_2b2a8012-db5c-4bdc-abd1-35a44dbdd452" provision.type="other"><no>(ii)</no><block><txt break.before="0">all stockpiled waste at the site; and</txt></block></li></list></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.68-ssec.2-para1.b" guid="_f8ab92e7-971c-4dc6-ab7e-d6a549396bdf" provision.type="other"><no>(b)</no><block><txt break.before="0">give the chief executive a copy of the results of the survey before the end of July in the following year.</txt></block></li></list></block><penalty id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.68-ssec.2-pen" guid="_729a38f8-7139-4230-953c-60dbcb8d195a"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.68-ssec.3" guid="_265e0751-e03a-477f-8ecf-06e8308c6b9d" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The volumetric survey must be carried out in compliance with the requirements applying for volumetric surveys under section 70.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.68-ssec.4" guid="_f0d314eb-624f-46bf-a4f0-d5370efe6659" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">This section continues to apply to the operator—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.68-ssec.4-para1.a" guid="_ff5e7df4-2892-4675-ba76-e9722c01899b" provision.type="other"><no>(a)</no><block><txt break.before="0">regardless of whether waste may no longer be delivered to the site; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.68-ssec.4-para1.b" guid="_ddfbddac-d1f2-4805-9411-fe6a928cfaac" provision.type="other"><no>(b)</no><block><txt break.before="0">even if the site ceases to be a levyable waste disposal site.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.68-ssec.5" guid="_a2413a5d-f2e7-4fbb-9776-cda23e23f482" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">However, if a matter mentioned in subsection (4) happens, the carrying out of the survey and the giving of a copy of the results to the chief executive may happen earlier than when otherwise required under subsection (2).</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.68-ssec.6" guid="_ae70fd91-dc98-448f-949a-a801fe1da2f9" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block><txt break.before="0">This section does not apply to a small site until 1 June 2022.</txt></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.69" guid="_8efbafc8-0f1e-403e-935e-736daa9aa535" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>69</no><heading id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.69-he" guid="_6cc08e44-9993-4f19-96ae-e18ced2f13f4">Volumetric survey for new landfill cells</heading><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.69-ssec.1" guid="_579c18ce-2702-4dc5-a3b9-4ace62a51443" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the operator of—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.69-ssec.1-para1.a" guid="_63ef5b3b-f2fe-4062-8286-f2d9921c5056" provision.type="other"><no>(a)</no><block><txt break.before="0">a levyable waste disposal site in the waste levy zone; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.69-ssec.1-para1.b" guid="_ba44cf9c-26bb-4005-b7b7-a30a1371d40f" provision.type="other"><no>(b)</no><block><txt break.before="0">a levyable waste disposal site in the non-levy zone if at least 600 tonnes of levyable waste generated outside the non-levy zone was received at the site during the preceding 12 months.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.69-ssec.2" guid="_00de6532-3c63-4d1c-95fe-d5074086312e" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">Before a landfill cell is used for the first time for disposing of waste to landfill at the site, the operator of the site must, in compliance with the requirements applying for volumetric surveys under section 70—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.69-ssec.2-para1.a" guid="_327212b1-41d5-4f8e-8dbb-978f935ebae1" provision.type="other"><no>(a)</no><block><txt break.before="0">ensure that a volumetric survey is carried out for the landfill cell; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.69-ssec.2-para1.b" guid="_ff76715d-a3e3-470a-bb32-e046f32c499b" provision.type="other"><no>(b)</no><block><txt break.before="0">before the end of the month immediately following the month in which the volumetric survey is carried out, give the chief executive a copy of the results of the survey in the approved form.</txt></block></li></list></block><penalty id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.69-ssec.2-pen" guid="_e4cfb605-875f-4edd-8c2b-0682f911e88f"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.69-ssec.3" guid="_1b0ce00f-45d8-4d4f-b433-3d823c7cfa7e" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">This section applies whether or not waste has previously been disposed of to landfill at the levyable waste disposal site.</txt></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.70" guid="_f93fcb92-e4cb-4505-8ce5-f310b6492701" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>70</no><heading id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.70-he" guid="_3022c152-8dfc-400e-8695-bbb416f0a281">Requirements for volumetric surveys</heading><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.70-ssec.1" guid="_1fa87ab7-cd18-45fe-add2-9b34fc23b152" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section states the requirements for carrying out volumetric surveys under this subdivision.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.70-ssec.2" guid="_4c319687-0938-4d60-bf33-c0dbf81d9e55" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">A volumetric survey must be carried out in compliance with the requirements prescribed by regulation.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.70-ssec.3" guid="_5a3dd950-ba43-4dad-810e-23e1ec75475f" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The results of the volumetric survey must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.70-ssec.3-para1.a" guid="_8b065c2a-b3d8-4c2d-8115-75dbf8fefb50" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.70-ssec.3-para1.b" guid="_b07e28f1-2ac4-4545-8770-99482105335e" provision.type="other"><no>(b)</no><block><txt break.before="0">be accompanied by a topographical plan complying with specifications advised by the chief executive; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.70-ssec.3-para1.c" guid="_972b63be-0d42-4071-98d5-ed2fcca7ce7d" provision.type="other"><no>(c)</no><block><txt break.before="0">be certified as accurate by a surveyor under the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-2003-070" target.version.series="58bf4472-9a2d-4809-9f04-c4ff625373da"><name emphasis="yes">Surveyors Act 2003</name></legref>.</txt></block></li></list></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.71" guid="_381b7072-3ec2-4f9d-8c93-7f821ad182d0" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>71</no><heading id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.71-he" guid="_236b4e5d-e84c-4560-ab9a-fb30a536ceab">Failure to carry out volumetric survey or give chief executive the results</heading><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.71-ssec.1" guid="_d829fa5f-6df1-4331-9979-f3ca02671775" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the operator of a levyable waste disposal site fails—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.71-ssec.1-para1.a" guid="_baddfc70-b840-44c2-862c-2944be96b3de" provision.type="other"><no>(a)</no><block><txt break.before="0">to comply with a requirement under this subdivision to carry out a volumetric survey; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.71-ssec.1-para1.b" guid="_c7c121aa-37f9-4c70-b353-9f3da2fc7850" provision.type="other"><no>(b)</no><block><txt break.before="0">to give a copy of the results of a volumetric survey to the chief executive.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.71-ssec.2" guid="_33ceae11-c0db-4fbb-967a-4457d15cc721" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may arrange for the volumetric survey to be carried out at the site and for that purpose may direct an authorised person to enter the site to facilitate the carrying out of the survey.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.5-sec.71-ssec.3" guid="_e22c7d14-b74a-4619-84b4-5301cc2304d5" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive may recover the reasonable cost of the survey from the operator as a debt payable by the operator to the State.</txt></block></subclause></clause></subdivision><subdivision id="sec.6-frag-ch.3-pt.5-div.2-sdiv.6" guid="_343b67cd-779b-4b36-8c2c-19eb81377ba7" affected.by.uncommenced="0"><no>Subdivision 6</no><heading id="sec.6-frag-ch.3-pt.5-div.2-sdiv.6-he" guid="_61333d7c-fe78-4de0-b343-ed12fb21a2e2">Waste data returns</heading><clause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.6-sec.72" guid="_d687e321-ab44-4b8e-a5fe-2b6f8673d89d" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>72</no><heading id="sec.6-frag-ch.3-pt.5-div.2-sdiv.6-sec.72-he" guid="_268a9c6f-d858-4843-8577-8b2c5f33f514">Submission of waste data returns</heading><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.6-sec.72-ssec.1" guid="_163f546c-acce-47a0-bac5-98902baf5c93" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a levyable waste disposal site must give the chief executive the returns (each a <defterm id="sec.6-frag-ch.3-pt.5-div.2-sdiv.6-sec.72-def.wastedatareturn" guid="_ee64ed2d-b976-40b8-9f2f-e8cc1da89851" type="definition">waste data return</defterm>) required of the operator under subsections (2) and (3)—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.6-sec.72-ssec.1-para1.a" guid="_566bacd4-eca2-4e48-8938-bf989accfa53" provision.type="other"><no>(a)</no><block><txt break.before="0">by the due date for the site; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.6-sec.72-ssec.1-para1.b" guid="_0ce8b6f9-b061-404d-8583-096f331e4683" provision.type="other"><no>(b)</no><block><txt break.before="0">in the way decided by the chief executive as published on the department’s website.</txt></block></li></list></block><penalty id="sec.6-frag-ch.3-pt.5-div.2-sdiv.6-sec.72-ssec.1-pen" guid="_9df6ffac-e5a4-48ca-b35d-f15ef0376758"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.6-sec.72-ssec.2" guid="_54a7408a-5b39-4c21-a5e9-db9f7290be76" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">Each of the following operators must give the chief executive a summary data return—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.6-sec.72-ssec.2-para1.a" guid="_4661bb15-e694-482f-9416-001fa069c900" provision.type="other"><no>(a)</no><block><txt break.before="0">the operator of a levyable waste disposal site in the waste levy zone;</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.6-sec.72-ssec.2-para1.b" guid="_b6f4e8f7-7947-4013-8b63-d4466787dd75" provision.type="other"><no>(b)</no><block><txt break.before="0">the operator of a levyable waste disposal site in the non-levy zone if any levyable waste, generated at a place outside the non-levy zone, is received at the site during the levy period to which the return relates.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.6-sec.72-ssec.3" guid="_32d1a7c0-5560-4594-bfca-d3d692f2c945" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">Each of the following operators must give the chief executive a detailed data return—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.6-sec.72-ssec.3-para1.a" guid="_83b78493-127e-4085-8681-1ac515c67188" provision.type="other"><no>(a)</no><block><txt break.before="0">the operator of a levyable waste disposal site in the waste levy zone if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.6-sec.72-ssec.3-para1.a-para2.i" guid="_92d06ae7-4a73-4e5f-9d7b-090a77bb4d02" provision.type="other"><no>(i)</no><block><txt break.before="0">the operator is required to hold an environmental authority for the disposal of more than 10,000 tonnes of waste in a year at the site; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.6-sec.72-ssec.3-para1.a-para2.ii" guid="_3d9cb2d4-bbbc-45c3-b153-967c05887d0a" provision.type="other"><no>(ii)</no><block><txt break.before="0">from 1 July 2021—the operator is required to hold an environmental authority for the disposal of more than 5,000 tonnes, but not more than 10,000 tonnes, of waste in a year at the site; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.6-sec.72-ssec.3-para1.a-para2.iii" guid="_75c2bb2a-f162-4bf1-8c74-0750b1115bbc" provision.type="other"><no>(iii)</no><block><txt break.before="0">from 1 July 2024—the operator is not mentioned in subparagraph (i) or (ii);</txt></block></li></list></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.6-sec.72-ssec.3-para1.b" guid="_43aa54a0-b6c6-47ed-b692-b4d1af0e7e5b" provision.type="other"><no>(b)</no><block><txt break.before="0">the operator of a levyable waste disposal site in the non-levy zone if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.6-sec.72-ssec.3-para1.b-para2.i" guid="_cec6a63b-bb7e-4281-86ce-d6a4a4c094e2" provision.type="other"><no>(i)</no><block><txt break.before="0">the operator is required to hold an environmental authority for the disposal of more than 10,000 tonnes of waste in a year at the site; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.6-sec.72-ssec.3-para1.b-para2.ii" guid="_4a669ffc-d734-4f12-869c-683bdd969a93" provision.type="other"><no>(ii)</no><block><txt break.before="0">at least 50 tonnes of levyable waste, generated outside the non-levy zone, is received at the site during the levy period to which the return relates.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.6-sec.72-ssec.5" guid="_f527a999-30f3-4d47-a7a5-4c097e1d2f18" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sec.6-frag-ch.3-pt.5-div.2-sdiv.6-sec.72-ssec.5-def.detaileddatareturn_" guid="_b7dfa102-26bf-444c-98c1-b7587875732d" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.5-div.2-sdiv.6-sec.72-ssec.5-def.detaileddatareturn" guid="_d668d301-b295-4b98-8206-b6e23e52b1e4" type="definition">detailed data return</defterm> means a return providing comprehensive information about all movements of waste and other material required to be measured under section 59.</txt></definition><definition id="sec.6-frag-ch.3-pt.5-div.2-sdiv.6-sec.72-ssec.5-def.duedate_" guid="_e15b15de-1a4c-4bcd-847e-916afcdc9eef" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.5-div.2-sdiv.6-sec.72-ssec.5-def.duedate" guid="_3a6b6fc7-4759-4bfe-bc03-96138134501c" type="definition">due date</defterm>, for a levyable waste disposal site, means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.6-sec.72-ssec.5-def.duedate-para1.a" guid="_0cc3668f-a323-4761-abe7-93e21ac122f5" provision.type="other"><no>(a)</no><block><txt break.before="0">the end of the last business day of the month following the end of a levy period for the site; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.6-sec.72-ssec.5-def.duedate-para1.b" guid="_b5adb6f5-6d33-4a43-8c51-599e315de739" provision.type="other"><no>(b)</no><block><txt break.before="0">if the chief executive grants an extension of time under section 72G, 72H or 72I for submitting the returns for the site—the end of the extension.</txt></block></li></list></definition><definition id="sec.6-frag-ch.3-pt.5-div.2-sdiv.6-sec.72-ssec.5-def.summarydatareturn_" guid="_997e347e-b953-4bd7-a694-d66046250014" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.5-div.2-sdiv.6-sec.72-ssec.5-def.summarydatareturn" guid="_94726ad3-31f3-46cb-ac84-c5228c682ebc" type="definition">summary data return</defterm> means a return providing a summary of information, required to be measured under section 59, that the chief executive may use to calculate amounts payable for a particular levy period for a levyable waste disposal site.</txt></definition></deflist></block></subclause></clause></subdivision><subdivision id="sec.6-frag-ch.3-pt.5-div.2-sdiv.7" guid="_243aba9e-3cfa-4c71-8cf1-d15650f895ca" affected.by.uncommenced="0"><no>Subdivision 7</no><heading id="sec.6-frag-ch.3-pt.5-div.2-sdiv.7-he" guid="_974f247f-d1e9-41a6-8008-d18c02ffce6f">Record keeping</heading><clause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.7-sec.72A" guid="_b761a01c-b3b4-4ba1-9739-fc9bd5ba8919" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>72A</no><heading id="sec.6-frag-ch.3-pt.5-div.2-sdiv.7-sec.72A-he" guid="_69965fad-0e35-46f8-85c3-cc48d53b5c73">Operator of levyable waste disposal site to keep particular documents</heading><subclause id="sec.6-frag-ch.3-pt.5-div.2-sdiv.7-sec.72A-ssec" guid="_18eb7c3b-6d0b-4a16-9cdb-3ac9e78c5200" affected.by.uncommenced="0" provision.type="other"><block><txt break.before="1">The operator of a levyable waste disposal site must keep at the site, or at another place agreed to by the chief executive and the operator, each of the following documents for the period stated for the document—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.7-sec.72A-ssec-para1.a" guid="_0f563316-ea12-42b3-894b-b87acc1db09c" provision.type="other"><no>(a)</no><block><txt break.before="0">a copy of a waste data return for 5 years after the return is given to the chief executive;</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.7-sec.72A-ssec-para1.b" guid="_e5da4e7c-7593-4a59-b743-910d708716d0" provision.type="other"><no>(b)</no><block><txt break.before="0">records containing any information that was used to support the preparation of a waste data return, including each of the following records, for 5 years after the return is given to the chief executive—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.7-sec.72A-ssec-para1.b-para2.i" guid="_b5e1f583-4efb-40a5-9c2e-9997ec429698" provision.type="other"><no>(i)</no><block><txt break.before="0">weighbridge records;</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.7-sec.72A-ssec-para1.b-para2.ii" guid="_a949a40c-ad9c-4fbf-8eed-9724bae1ded5" provision.type="other"><no>(ii)</no><block><txt break.before="0">if weight measurement criteria were used—records of vehicles delivering waste to the site;</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.7-sec.72A-ssec-para1.b-para2.iii" guid="_e09ed81b-60a7-4429-8a79-80ccf275d67c" provision.type="other"><no>(iii)</no><block><txt break.before="0">for small sites that have used an alternative methodology under section 325, records that enable the chief executive to fairly work out the total waste levy amount owing for the site in a levy period;</txt></block></li></list></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.7-sec.72A-ssec-para1.c" guid="_c766adb0-cc0f-4e81-ab65-1e424f2d5128" provision.type="other"><no>(c)</no><block><txt break.before="0">a record required to be kept under section 58(3)(b) and section 65(2)(b) for 5 years after the record is made;</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.7-sec.72A-ssec-para1.d" guid="_9eb0cf34-59dd-47b6-95c9-af6e1b0a756b" provision.type="other"><no>(d)</no><block><txt break.before="0">a copy of the results of a volumetric survey of a landfill cell at the site for 5 years after the survey is carried out;</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.7-sec.72A-ssec-para1.e" guid="_f03aecdd-1bca-473b-bfed-39e89332bb58" provision.type="other"><no>(e)</no><block><txt break.before="0">a copy of the results of a volumetric survey of stockpiled waste at the site for 5 years after the survey is carried out;</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.7-sec.72A-ssec-para1.f" guid="_9983d06b-a5e5-4229-9885-1ec9ead9fb6f" provision.type="other"><no>(f)</no><block><txt break.before="0">a copy of a notice the operator is required to give the chief executive under this chapter for 5 years after giving the notice;</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.2-sdiv.7-sec.72A-ssec-para1.g" guid="_d1463069-f54e-4a18-92f9-834b29733e05" provision.type="other"><no>(g)</no><block><txt break.before="0">any other record prescribed by regulation for the period prescribed by regulation.</txt></block></li></list><penalty id="sec.6-frag-ch.3-pt.5-div.2-sdiv.7-sec.72A-ssec-pen" guid="_9b191689-14bb-4935-bc5a-94710dbf9ab1"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></block></subclause></clause></subdivision></division><division id="sec.6-frag-ch.3-pt.5-div.3" guid="_ee51ffb4-9e10-4fbc-afb2-42a51bf86ff5" affected.by.uncommenced="0"><no>Division 3</no><heading id="sec.6-frag-ch.3-pt.5-div.3-he" guid="_cbd83ab8-b279-4c33-a75a-cf758b0a8152">Payment options</heading><subdivision id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1" guid="_9c90c3b1-de6a-4911-baab-1147c1ae913f" affected.by.uncommenced="0"><no>Subdivision 1</no><heading id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-he" guid="_09548653-776e-4d04-b388-39cf8fb388bc">Waste levy instalment agreements</heading><clause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72B" guid="_7a3cbc3f-81b8-48f9-835c-994b561afebf" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>72B</no><heading id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72B-he" guid="_1dba5acf-0af8-46b8-b211-41d33dc076e1">Waste levy instalment agreement</heading><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72B-ssec.1" guid="_c7d330a5-a03d-413f-9cf5-2d1808399b5d" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">A <defterm id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72B-def.wastelevyinstalmentagreement" guid="_3d4c99c0-c070-45a8-b7de-697c0787fe4d" type="definition">waste levy instalment agreement</defterm> is an agreement between the operator of a levyable waste disposal site and the chief executive providing for the payment by instalments of a waste levy amount owed by the operator instead of in compliance with the requirements that would otherwise apply under this chapter for the payment of the amount.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72B-ssec.2" guid="_6de29e12-1031-4b4a-88f1-245262036e23" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">A waste levy instalment agreement may relate to 2 or more levyable waste disposal sites for which the same person is the operator.</txt></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72C" guid="_d827bcf7-e391-4b98-9557-e8d4344ce1a4" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>72C</no><heading id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72C-he" guid="_7dbf855d-dfae-4c66-98a7-87aa8ca4a7b7">Application for waste levy instalment agreement</heading><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72C-ssec.1" guid="_e0e97f56-400b-4c95-a236-ee9a194d5545" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a levyable waste disposal site may apply to the chief executive to enter into a waste levy instalment agreement for a waste levy amount the operator must pay the State.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72C-ssec.2" guid="_43def42a-bfb3-48d1-9fc1-e65ffa716c6f" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The application must be in the approved form and be accompanied by—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72C-ssec.2-para1.a" guid="_c58ffd2b-8127-438e-9cd3-cf19718bffbd" provision.type="other"><no>(a)</no><block><txt break.before="0">a description of the operator’s financial situation that caused the operator’s inability to pay the waste levy amount by the due date for payment and how the financial situation came about; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72C-ssec.2-para1.b" guid="_01196f81-64c0-4e82-806e-8385c88bfe27" provision.type="other"><no>(b)</no><block><txt break.before="0">up-to-date management and financial records to verify the information given under paragraph (a).</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72C-ssec.3" guid="_a2a5f4e1-eb66-4467-ad5f-f608e4db2525" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive must, within 20 days after receiving the application, decide either to grant or to refuse the application and—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72C-ssec.3-para1.a" guid="_5ad6da56-6c41-4197-9f88-f2f077d563ec" provision.type="other"><no>(a)</no><block><txt break.before="0">if the decision is to grant the application—give the operator a notice stating—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72C-ssec.3-para1.a-para2.i" guid="_9210e2f9-816e-4220-b2c2-5b07661caec1" provision.type="other"><no>(i)</no><block><txt break.before="0">the terms of the waste levy instalment agreement; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72C-ssec.3-para1.a-para2.ii" guid="_f4bc5690-86ee-421b-ad4b-b328cd910e22" provision.type="other"><no>(ii)</no><block><txt break.before="0">the period within which all waste levy amounts must be paid under the waste levy instalment agreement; or</txt></block></li></list></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72C-ssec.3-para1.b" guid="_252fe312-aad1-439c-8a55-0d047b742acd" provision.type="other"><no>(b)</no><block><txt break.before="0">if the decision is to refuse the application— give the operator an information notice for the decision.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72C-ssec.4" guid="_89b91c9e-fd24-4e00-a24f-09913a03a741" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive may grant the application only if satisfied the applicant has demonstrated—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72C-ssec.4-para1.a" guid="_ef277ffc-1673-4303-8932-ad519901bd77" provision.type="other"><no>(a)</no><block><txt break.before="0">an inability to pay the waste levy amount within the time required under this chapter; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72C-ssec.4-para1.b" guid="_566370f0-9ac6-458f-8bc3-592a75f88ee9" provision.type="other"><no>(b)</no><block><txt break.before="0">how entering into the waste levy instalment agreement will allow the applicant to pay the waste levy amount while at the same time allowing the applicant to pay future waste levy amounts.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72C-ssec.5" guid="_7da4ea91-4328-4f6b-90a2-bf8289991339" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">However—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72C-ssec.5-para1.a" guid="_c71a39d2-4110-4789-a0cb-e6b18db1d52e" provision.type="other"><no>(a)</no><block><txt break.before="0">there may be only 1 waste levy instalment agreement in force between the operator of a levyable waste disposal site and the chief executive at any time; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72C-ssec.5-para1.b" guid="_6a98701f-87a5-4d67-bdcd-abe0313e37c3" provision.type="other"><no>(b)</no><block><txt break.before="0">only 1 waste levy instalment agreement may be entered into between the operator of a levyable waste disposal site and the chief executive in a financial year; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72C-ssec.5-para1.c" guid="_9904c978-f224-4e2b-9643-e60f19c74614" provision.type="other"><no>(c)</no><block><txt break.before="0">the period within which all waste levy amounts must be paid under the waste levy instalment agreement must not be longer than 6 months after the agreement is entered into.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72C-ssec.6" guid="_185df2c9-8b3c-4d6d-a67f-30504c35b29f" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block><txt break.before="0">A failure to make a decision within the period required is taken to be a decision by the chief executive to refuse the application.</txt></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72D" guid="_afee46d1-1472-4931-8e64-3d483cccb84b" affected.by.uncommenced="0" spent.amends="0" provision.type="amend"><no>72D</no><heading id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72D-he" guid="_1167df76-20db-46b2-a586-aa476f18227b">Amendment of waste levy instalment agreement</heading><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72D-ssec.1" guid="_b6198810-c7fa-4e4f-9286-07ad2d3d16ff" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a levyable waste disposal site may apply to the chief executive for an amendment of a waste levy instalment agreement to—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72D-ssec.1-para1.a" guid="_89f00a80-94bb-4931-9d8a-7d3a1b4adb18" provision.type="other"><no>(a)</no><block><txt break.before="0">include an additional waste levy amount; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72D-ssec.1-para1.b" guid="_35e127a7-929c-484b-8874-0a3529c45e41" provision.type="other"><no>(b)</no><block><txt break.before="0">extend the period for the repayment of the total waste levy amount the subject of the agreement.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72D-ssec.2" guid="_f4646714-b5a9-4350-83a7-687823e6a1be" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">However—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72D-ssec.2-para1.a" guid="_0e7784c5-8109-47bd-a24b-a9ee6e210d8a" provision.type="other"><no>(a)</no><block><txt break.before="0">any additional waste levy amount must not be greater than 10% of the total waste levy amount owing by the operator when the application is made, other than an amount already the subject of the agreement; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72D-ssec.2-para1.b" guid="_d3c4a995-a484-4da9-ab55-466a29bf81c5" provision.type="other"><no>(b)</no><block><txt break.before="0">the period of any extension must not be more than 3 months; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72D-ssec.2-para1.c" guid="_3ec63b96-6bfa-4242-9d38-a0dbfe206065" provision.type="other"><no>(c)</no><block><txt break.before="0">the operator must not have previously made an application for the amendment of the waste levy instalment agreement.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72D-ssec.3" guid="_0a4fc3ba-95cd-4e31-b700-323dbc8009fb" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The application must be in the approved form and state—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72D-ssec.3-para1.a" guid="_479ecd98-1571-43c4-95e6-06dba6865b69" provision.type="other"><no>(a)</no><block><txt break.before="0">any additional waste levy amount sought to be included in the agreement; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72D-ssec.3-para1.b" guid="_b1df1ed3-0e75-48c1-b9ce-1e04a305448f" provision.type="other"><no>(b)</no><block><txt break.before="0">the length of any extension sought; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72D-ssec.3-para1.c" guid="_91f4d53c-0051-4ba7-8518-8a358d134259" provision.type="other"><no>(c)</no><block><txt break.before="0">the changes in the applicant’s circumstances that have caused the applicant to seek the amendment.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72D-ssec.4" guid="_6e17721c-6c46-4384-a38b-650d91006e09" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive must, within 20 days after receiving the application, decide either to grant or to refuse the application and—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72D-ssec.4-para1.a" guid="_c8325ff3-3d5a-4afd-a3ad-1273a0e38699" provision.type="other"><no>(a)</no><block><txt break.before="0">if the decision is to grant the application—give the operator a notice stating—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72D-ssec.4-para1.a-para2.i" guid="_7e08edbe-3b08-48c7-92f2-5c8573b9c062" provision.type="other"><no>(i)</no><block><txt break.before="0">the terms of the amended waste levy instalment agreement; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72D-ssec.4-para1.a-para2.ii" guid="_458155ee-6391-4585-8af6-6b5f4bdefdef" provision.type="other"><no>(ii)</no><block><txt break.before="0">the period within which all waste levy amounts must be paid under the amended waste levy instalment agreement; or</txt></block></li></list></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72D-ssec.4-para1.b" guid="_1ef260fc-b398-42ef-849b-78080453d649" provision.type="other"><no>(b)</no><block><txt break.before="0">if the decision is to refuse the application— give the operator an information notice for the decision.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72D-ssec.5" guid="_76214974-9466-4ba6-a1ac-43dffbe559f9" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">The chief executive may grant the application only if satisfied the applicant has demonstrated—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72D-ssec.5-para1.a" guid="_8d604263-0bac-4071-b6a9-4ad11d88d7f2" provision.type="other"><no>(a)</no><block><txt break.before="0">an inability to pay waste levy amounts owing within the time provided for in the agreement; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72D-ssec.5-para1.b" guid="_fc54de38-7ac3-4bc7-b654-4dd1b1a520d0" provision.type="other"><no>(b)</no><block><txt break.before="0">how amendment of the agreement will allow the applicant to pay all waste levy amounts owing and future waste levy amounts.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72D-ssec.6" guid="_b32d4c5f-f2b3-48cd-82f6-cca9348b182a" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block><txt break.before="0">The making of an application under this section does not of itself affect the applicant’s obligations under the waste levy instalment agreement sought to be amended.</txt></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72E" guid="_bdcb62c1-4d75-4eae-a7b6-d6668ae8037e" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>72E</no><heading id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72E-he" guid="_7a871941-c4df-4cdf-a2d3-612b32cbf245">Interest affected by waste levy instalment agreement</heading><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72E-ssec.1" guid="_678f5f3c-9983-4e51-858b-f276cf87270c" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">Subsection (2) applies for a waste levy instalment agreement if— </txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72E-ssec.1-para1.a" guid="_5d37a549-1005-4e84-a4ee-f7c1abfab23a" provision.type="other"><no>(a)</no><block><txt break.before="0">the application for the agreement was made after the due date for payment of a waste levy amount the subject of the application; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72E-ssec.1-para1.b" guid="_fae6b38f-5ebb-4c1c-b793-c64494767526" provision.type="other"><no>(b)</no><block><txt break.before="0">the agreement is entered into.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72E-ssec.2" guid="_591301a2-bd0a-4008-b4a9-0ff02a789fc6" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">Interest is payable under this chapter up to the day the application was made and must be paid on or before the due date for payment of the next waste levy amount.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72E-ssec.3" guid="_d5c00f85-1ab5-4369-9efe-0a364966494d" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">If an application for a waste levy instalment agreement is refused, the requirements under this chapter for the payment of interest continue to apply unaffected by the making or refusal of the application.</txt></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72F" guid="_48ee449a-4e3b-41a2-b9fe-a1c553a77663" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>72F</no><heading id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72F-he" guid="_2f3b2247-be3a-4518-a0d0-cca5f634faf6">Failure to pay an instalment under waste levy instalment agreement</heading><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72F-ssec.1" guid="_e6e35a86-7a2b-437a-aabc-7f724a6f0fa0" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">If an instalment of a waste levy amount is not paid on or before an instalment day under a waste levy instalment agreement—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72F-ssec.1-para1.a" guid="_e3fa3ef6-90a2-495c-9adb-63cb37335f81" provision.type="other"><no>(a)</no><block><txt break.before="0">the waste levy instalment agreement is taken to be no longer in force; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72F-ssec.1-para1.b" guid="_d305c306-df3b-4cc1-a862-b76f879e226c" provision.type="other"><no>(b)</no><block><txt break.before="0">the due date for payment of any waste levy amount provided for in the agreement becomes—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72F-ssec.1-para1.b-para2.i" guid="_693b99be-0739-42c7-955b-ff9bb4ebcff7" provision.type="other"><no>(i)</no><block><txt break.before="0">if the amount, apart from the agreement, would have been required to be paid on a day later than the instalment day—the later day; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72F-ssec.1-para1.b-para2.ii" guid="_509cecd4-be3c-4110-b17a-217880841314" provision.type="other"><no>(ii)</no><block><txt break.before="0">if the amount, apart from the agreement, would have been required to be paid on a day earlier than the instalment day—the day after the instalment day, or if that day is not a business day, the next business day; and</txt></block></li></list></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72F-ssec.1-para1.c" guid="_ce05a639-8b74-4635-a403-ad59b4082435" provision.type="other"><no>(c)</no><block><txt break.before="0">for an amount mentioned in paragraph (b)(ii), interest becomes payable on the amount as if the waste levy instalment agreement had not been entered into, but only on and from the day after the instalment day, whether or not the day after the instalment day is a business day.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72F-ssec.2" guid="_91a49996-3004-4fef-af57-bbf72dbb0f7e" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72F-ssec.2-def.instalmentday_" guid="_213a50d9-ebad-4f7c-9176-785df5a9c08f" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.5-div.3-sdiv.1-sec.72F-ssec.2-def.instalmentday" guid="_2c05e32d-8c4d-4b1c-b17d-8c34a90d37bf" type="definition">instalment day</defterm>, under a waste levy instalment agreement, means a day when a payment is due under the agreement.</txt></definition></deflist></block></subclause></clause></subdivision><subdivision id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2" guid="_c8bffd76-7b03-45ff-bed7-608e4941723f" affected.by.uncommenced="0"><no>Subdivision 2</no><heading id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-he" guid="_7100773c-8f43-4aa9-b559-5fa09173c081">Extension of time</heading><clause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72G" guid="_29895e25-4348-4b5a-a1c5-919235bc3f9f" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>72G</no><heading id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72G-he" guid="_42e98360-f42a-488c-825d-4803bf1bf50f">Application for extension of time to pay waste levy amount</heading><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72G-ssec.1" guid="_e7c665cb-91d0-4d81-95a9-f746a2e85355" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a levyable waste disposal site may apply to the chief executive for an extension of time to pay a waste levy amount if the operator believes the operator can not pay the amount by the due date for payment of the amount.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72G-ssec.2" guid="_5aaeae17-b84f-40cf-b4c3-2d190fc8001c" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">However—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72G-ssec.2-para1.a" guid="_9e524bbc-84ef-4aa6-91c5-9f001fdd4276" provision.type="other"><no>(a)</no><block><txt break.before="0">the extension of time can not be for more than 1 month; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72G-ssec.2-para1.b" guid="_1aab2ed1-9706-4c6f-9fb8-3736a0f9c2ac" provision.type="other"><no>(b)</no><block><txt break.before="0">the operator can not apply for the extension of time if the operator is conducting operations at the site for which the operator does not hold an environmental authority; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72G-ssec.2-para1.c" guid="_48988fea-53e1-41c3-993e-bf3f41789481" provision.type="other"><no>(c)</no><block><txt break.before="0">the operator can not make more than—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72G-ssec.2-para1.c-para2.i" guid="_c6d26eff-ce4e-4ecb-9a01-09e37a39d144" provision.type="other"><no>(i)</no><block><txt break.before="0">1 application for an extension of time under this section or section 72H for the payment of the same waste levy amount; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72G-ssec.2-para1.c-para2.ii" guid="_5dc6fff2-a2d4-4624-a2a1-5f14986c6a78" provision.type="other"><no>(ii)</no><block><txt break.before="0">2 applications under this section or section 72H in a financial year.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72G-ssec.3" guid="_72d59679-7087-4ecd-bf25-b4836abb39c2" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The application must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72G-ssec.3-para1.a" guid="_1d940789-cd75-40b6-93ae-8120c55bc9a6" provision.type="other"><no>(a)</no><block><txt break.before="0">be made before the due date for payment of the waste levy amount; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72G-ssec.3-para1.b" guid="_a05e863b-cae4-44d4-83ed-45b522cea578" provision.type="other"><no>(b)</no><block><txt break.before="0">state the reasons why the extension is being applied for.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72G-ssec.4" guid="_da7219f0-1100-4adb-9d94-399c25f92678" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive must, within 5 business days after the due date for payment of the waste levy amount, decide either to grant or to refuse the application and—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72G-ssec.4-para1.a" guid="_6b7474e8-1053-40b2-8a78-a58dc93b12ab" provision.type="other"><no>(a)</no><block><txt break.before="0">if the decision is to grant the application—give the applicant a notice stating a new due date for payment of the waste levy amount; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72G-ssec.4-para1.b" guid="_db591ad8-a9ed-4d97-b930-54e633534633" provision.type="other"><no>(b)</no><block><txt break.before="0">if the decision is to refuse the application—give the applicant an information notice for the decision.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72G-ssec.5" guid="_000a4461-a518-41f8-b02f-e56bb7316450" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">The chief executive may grant the application only if satisfied that it is not reasonable to expect the applicant to pay the waste levy amount by the due date for payment.</txt></block><note id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72G-ssec.5-note" guid="_553b5217-2c51-47d8-aec4-fcaf348abf07" type="example"><heading id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72G-ssec.5-note-he" guid="_c48d11d6-19b1-42ee-9c49-263a99a355e3">Example of when the chief executive may grant an application—</heading><block><txt break.before="1">The operator has suffered a significant disruption to electricity supply or an extensive computer malfunction.</txt></block></note></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72G-ssec.6" guid="_0383f93c-2560-4a17-a289-7acd4bc382a2" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block><txt break.before="0">A failure to make a decision within the period required is taken to be a decision by the chief executive to refuse the application.</txt></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72H" guid="_ef4de3f5-0c28-4b82-8cfe-cadc302bdfb9" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>72H</no><heading id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72H-he" guid="_e3fcebf8-78b9-43a1-afc5-c169bdf6b10a">Application for extension of time to submit waste data return and pay waste levy amount </heading><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72H-ssec.1" guid="_4daa544b-d9e1-4b07-aa4d-db68ef6fd25b" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a levyable waste disposal site may apply to the chief executive for an extension of time to submit a waste data return and pay a waste levy amount if the operator considers the operator can not pay the amount by the due date for payment of the amount.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72H-ssec.2" guid="_7a77a00f-a1a6-4710-b49b-dadf913c2f37" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">However—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72H-ssec.2-para1.a" guid="_9aecded1-7626-400c-9d43-21616ac63d9e" provision.type="other"><no>(a)</no><block><txt break.before="0">the extension of time can not be for more than 1 month after—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72H-ssec.2-para1.a-para2.i" guid="_05c0fb58-6c98-45e6-b2b8-2d1d43889c21" provision.type="other"><no>(i)</no><block><txt break.before="0">for submission of the waste data return—the due date for submission of the return; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72H-ssec.2-para1.a-para2.ii" guid="_a1a4f591-6816-462a-becc-c56252ad602a" provision.type="other"><no>(ii)</no><block><txt break.before="0">for payment of the waste levy amount—the due date for payment of the amount; and</txt></block></li></list></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72H-ssec.2-para1.b" guid="_21cd5487-9d2f-4a06-a679-3e2ebe863e57" provision.type="other"><no>(b)</no><block><txt break.before="0">the operator can not apply for the extension of time if the operator is conducting operations at the site for which the operator does not hold an environmental authority; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72H-ssec.2-para1.c" guid="_e9acfd76-6502-48f6-ad46-816c2d80cd5c" provision.type="other"><no>(c)</no><block><txt break.before="0">the operator can not make more than—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72H-ssec.2-para1.c-para2.i" guid="_7e2ccddc-3d26-4d63-a1d3-3cbabea428c9" provision.type="other"><no>(i)</no><block><txt break.before="0">1 application for an extension of time under this section or section 72G for the payment of the same waste levy amount; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72H-ssec.2-para1.c-para2.ii" guid="_65db3b93-a15a-472e-9b3e-0d9091f1a16c" provision.type="other"><no>(ii)</no><block><txt break.before="0">2 applications under this section or section 72G in a financial year.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72H-ssec.3" guid="_12ffcd8b-7927-467b-8986-a175613dc45d" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The application must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72H-ssec.3-para1.a" guid="_b5286895-3dd8-4db4-9540-b65c5445dda6" provision.type="other"><no>(a)</no><block><txt break.before="0">be made by the due date for the submission of the waste data return for the site; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72H-ssec.3-para1.b" guid="_6030187e-f130-4f55-894a-b6f76e6e3bc5" provision.type="other"><no>(b)</no><block><txt break.before="0">state the reasons why the extension is being applied for.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72H-ssec.4" guid="_9fbe3e00-44cd-463c-9b48-b8efa7a8a122" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive must, within 5 business days after the due date for the submission of the waste data return for the site, decide either to grant or to refuse the application and—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72H-ssec.4-para1.a" guid="_0150b2e3-9e57-48ea-9aad-9a82c6ad6d11" provision.type="other"><no>(a)</no><block><txt break.before="0">if the decision is to grant the application—give the applicant a notice stating a new day by which the waste data return must be submitted and the new date by which the waste levy amount must be paid; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72H-ssec.4-para1.b" guid="_dc8c49c5-7f42-45bc-84c2-c0e19fd10c92" provision.type="other"><no>(b)</no><block><txt break.before="0">if the decision is to refuse the application—give the applicant an information notice for the decision.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72H-ssec.5" guid="_fdcd2201-95b2-48f1-8125-67439f35673f" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">The chief executive may grant the application only if satisfied that it is not reasonable to expect the applicant to pay the waste levy amount by the due date for payment.</txt></block><note id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72H-ssec.5-note" guid="_80e20907-a95f-4aac-bf8a-19b0042689b9" type="example"><heading id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72H-ssec.5-note-he" guid="_70c01ecd-8e83-421d-8ecf-21d3defd5e38">Example of when the chief executive may grant an application—</heading><block><txt break.before="1">The operator has suffered a significant disruption to electricity supply or an extensive computer malfunction.</txt></block></note></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72H-ssec.6" guid="_d3c90317-70d9-4ca4-bb73-897e847bf6b9" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block><txt break.before="0">A failure to make a decision within the period required is taken to be a decision by the chief executive to refuse the application.</txt></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72I" guid="_c1bb15c7-ca42-4967-bb7e-4a39b51e4d67" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>72I</no><heading id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72I-he" guid="_c7b356e9-b403-4cbb-92b1-7fe1f454daf6">Public notice granting extension of time to submit waste data return and pay waste levy amount</heading><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72I-ssec.1" guid="_01c229fe-2618-467f-bf23-71dd6c6a91e2" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may by publication on the department’s website grant an extension of time to the operators of stated levyable waste disposal sites to do either of the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72I-ssec.1-para1.a" guid="_f40fbabd-0d27-4602-915a-fd5383a1d172" provision.type="other"><no>(a)</no><block><txt break.before="0">pay a waste levy amount;</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72I-ssec.1-para1.b" guid="_61209da0-b3f7-4f5a-8cbd-62fc91c75420" provision.type="other"><no>(b)</no><block><txt break.before="0">submit a waste data return and pay a waste levy amount.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.2-sec.72I-ssec.2" guid="_1ef5c8b6-7e57-4643-871d-6a0ec8f369f3" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may grant an extension under this section only if satisfied that the extension is justified because of a significant emergency.</txt></block></subclause></clause></subdivision><subdivision id="sec.6-frag-ch.3-pt.5-div.3-sdiv.3" guid="_186ea904-bfb1-440e-9f09-4f5cf1790bb2" affected.by.uncommenced="0"><no>Subdivision 3</no><heading id="sec.6-frag-ch.3-pt.5-div.3-sdiv.3-he" guid="_81248434-a449-4cf7-9192-6d85eb0e3030">Chief executive’s estimation of waste levy amount</heading><clause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.3-sec.72J" guid="_435a5b33-b96c-47f8-b6a5-263f6f3e877f" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>72J</no><heading id="sec.6-frag-ch.3-pt.5-div.3-sdiv.3-sec.72J-he" guid="_317ce63a-522d-4bfe-a2d2-aedb64d3728b">Estimation of waste levy amount payable by operator of levyable waste disposal site</heading><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.3-sec.72J-ssec.1" guid="_e5ab00ec-358d-476c-a456-51574eade7dd" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may decide an estimate of the waste levy amount payable by the operator of a levyable waste disposal site for a particular period (the <defterm id="sec.6-frag-ch.3-pt.5-div.3-sdiv.3-sec.72J-def.estimatedwastelevyamount" guid="_c5c4abda-8423-4e01-90ec-daa4cb912939" type="definition">estimated waste levy amount</defterm>) if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.3-sec.72J-ssec.1-para1.a" guid="_9a8cbf69-ec0e-49b3-85a6-72a380c51a6b" provision.type="other"><no>(a)</no><block><txt break.before="0">the operator did not give the chief executive a waste data return by the due date for the site under section 72; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.3-sec.72J-ssec.1-para1.b" guid="_b27658c4-2165-4657-9c47-791a8f43fe48" provision.type="other"><no>(b)</no><block><txt break.before="0">the operator gave the chief executive information, whether or not in the form of a waste data return, that the chief executive considers on reasonable grounds to be incomplete or inaccurate; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.3-sec.72J-ssec.1-para1.c" guid="_332401ff-a1a4-4c70-a670-06c2f0612625" provision.type="other"><no>(c)</no><block><txt break.before="0">the chief executive is satisfied on reasonable grounds that the waste levy amount payable by the operator for the period is incorrect.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.3-sec.72J-ssec.2" guid="_f8115a71-5dc0-4d86-ad2e-1514b48df0ce" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">If the chief executive decides an estimated waste levy amount for the operator—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.3-sec.72J-ssec.2-para1.a" guid="_4656eec3-729c-4564-9dda-074d202a3027" provision.type="other"><no>(a)</no><block><txt break.before="0">that amount becomes the waste levy amount payable by the operator for the period; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.3-sec.72J-ssec.2-para1.b" guid="_8b6aa53c-1c9c-4b95-8fd0-0dc49f976d17" provision.type="other"><no>(b)</no><block><txt break.before="0">the chief executive must give the operator an information notice for the decision.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.3-sec.72J-ssec.3" guid="_962395d3-8018-4e51-a760-405c7cfff500" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">To remove any doubt, it is declared that—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.3-sec.72J-ssec.3-para1.a" guid="_9f23ebc3-aedc-4c98-8c5a-eec00eed3824" provision.type="other"><no>(a)</no><block><txt break.before="0">the chief executive may act under this section even if the due date for payment of the waste levy amount payable has passed; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.3-sec.72J-ssec.3-para1.b" guid="_a874996c-f608-4e77-aba9-5e6e4feea74d" provision.type="other"><no>(b)</no><block><txt break.before="0">the chief executive deciding an estimate of the waste levy amount payable by the operator for a period under this section does not change the due date for payment of the amount; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.3-sec.72J-ssec.3-para1.c" guid="_3e6d1e39-e01d-4ce4-b02f-29999257b1d5" provision.type="other"><no>(c)</no><block><txt break.before="0">nothing in this section stops a subsequent adjustment being made to the waste levy amount payable by the operator for the period if a different amount is decided under a review of the chief executive’s decision on the estimated waste levy amount.</txt></block></li></list></block></subclause></clause></subdivision><subdivision id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4" guid="_6f389b73-ee5a-4c41-9df4-e7bb3103a0d4" affected.by.uncommenced="0"><no>Subdivision 4</no><heading id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-he" guid="_adf84b42-1154-495c-aa53-f65868169592">Bad debt credit</heading><clause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K" guid="_68c540b4-2218-4c3f-9648-8864d96d491f" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>72K</no><heading id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-he" guid="_ad6b7d8b-35f5-4eeb-88f5-1459a783ad62">Eligibility for bad debt credit after insolvency or bankruptcy of customer</heading><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.1" guid="_720503ab-106f-4b84-b463-c190ed83d14c" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a waste disposal site is eligible for a credit (a <defterm id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-def.baddebtcredit" guid="_26a5eaed-75a7-4ae8-9f3c-a76ffa324ec0" type="definition">bad debt credit</defterm>) for the waste levy amount payable by the operator on an amount of waste delivered to the site if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.1-para1.a" guid="_2f455e9c-823f-4a58-b040-246cef883532" provision.type="other"><no>(a)</no><block><txt break.before="0">the operator was the operator of the site when the waste was delivered; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.1-para1.b" guid="_9c17102e-e449-4021-bb7c-e62043cd06ae" provision.type="other"><no>(b)</no><block><txt break.before="0">the waste was delivered to the site by another person (the <defterm id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.1-def.customer" guid="_95c16cfa-8526-4030-9c28-1edc76f033a1" type="definition">customer</defterm>) for consideration in money; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.1-para1.c" guid="_2b86b20f-4a32-4c28-9af9-de3aa86925b9" provision.type="other"><no>(c)</no><block><txt break.before="0">the operator included the waste in a summary data return for the site for the levy period in which the waste was delivered; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.1-para1.d" guid="_1cafdebc-354e-4c39-a4ba-1cc67a075771" provision.type="other"><no>(d)</no><block><txt break.before="0">the operator paid the waste levy amount; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.1-para1.e" guid="_8e70e988-2deb-44ef-8a80-c40664249481" provision.type="other"><no>(e)</no><block><txt break.before="0">the operator issued an invoice to the customer for the delivery within 30 days after the waste was delivered to the site and— </txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.1-para1.e-para2.i" guid="_ef10d530-68db-4169-9859-b225e7c2614a" provision.type="other"><no>(i)</no><block><txt break.before="0">the invoice expressly included a service delivery charge for the operator’s obligation to pay waste levy on the waste when delivered to the site; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.1-para1.e-para2.ii" guid="_db85d347-95c8-45c9-99ef-d1503218eb67" provision.type="other"><no>(ii)</no><block><txt break.before="0">the service delivery charge, excluding any component for GST, was not more than the waste levy amount; and</txt></block></li></list></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.1-para1.f" guid="_0e5c0018-017d-4d13-9518-93bb4dd700a3" provision.type="other"><no>(f)</no><block><txt break.before="0">the customer failed to pay the operator all or part of the amount due for delivery of the waste within 30 days after being given an invoice for the amount; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.1-para1.g" guid="_dda935d3-bbcd-4331-9ea0-e6366d3ac9aa" provision.type="other"><no>(g)</no><block><txt break.before="0">the customer became insolvent within 12 months after the delivery of the waste to the site; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.1-para1.h" guid="_947c88ae-ae89-4a7c-9ae9-bf2ad1818091" provision.type="other"><no>(h)</no><block><txt break.before="0">the operator has been unable to recover the amount owing from the customer despite having taken reasonable steps to do so; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.1-para1.i" guid="_4a898b07-ce91-424e-b9c1-be6f48e0db39" provision.type="other"><no>(i)</no><block><txt break.before="0">the operator has offset against the amount owing by the customer any amount owed by the operator to the customer that may be set off against that amount; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.1-para1.j" guid="_32535ef0-3c9c-4ac0-9b3d-bb6eac42f9a6" provision.type="other"><no>(j)</no><block><txt break.before="0">the operator has reduced the amount owing by the value of any enforceable security the operator holds in relation to the customer but an amount remains outstanding in relation to the delivery; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.1-para1.k" guid="_d8ec2909-ef10-4d38-a932-a0568676bee4" provision.type="other"><no>(k)</no><block><txt break.before="0">the operator has submitted all the waste data returns and paid all waste levy owing by the operator when applying for the bad debt credit.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.2" guid="_0db737ee-b2a5-421a-b08b-303f07c56826" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">However, the operator is not eligible for the bad debt credit if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.2-para1.a" guid="_d7e24f58-4c06-48e8-9bb4-514967d060d5" provision.type="other"><no>(a)</no><block><txt break.before="0">the operator and the customer are, or were when the waste was delivered, related entities; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.2-para1.b" guid="_0ca5475f-7500-4992-b01b-1ecc9d26076b" provision.type="other"><no>(b)</no><block><txt break.before="0">it is for an amount of waste delivered to the site while the customer continued to owe the operator an amount, for a previous delivery of waste, more than 30 days after being given an invoice for the previous delivery; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.2-para1.c" guid="_5fc4aaa8-93ee-46cc-a27f-c353ea85d46d" provision.type="other"><no>(c)</no><block><txt break.before="0">the operator has previously received a bad debt credit for the relevant delivery of the waste.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.3" guid="_f4a4952c-2fe5-4b07-beed-cf7ed3a56e36" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">A person is a <defterm id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-def.relatedentity" guid="_1a500fbd-78df-43a6-82a0-62f2463f4cc9" type="definition">related entity</defterm> for another person if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.3-para1.a" guid="_c6201994-82c2-48ed-939c-67110e7e3269" provision.type="other"><no>(a)</no><block><txt break.before="0">for individuals—they are members of the same family; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.3-para1.b" guid="_2c19b43a-542e-4684-b4fe-6a8fab40e668" provision.type="other"><no>(b)</no><block><txt break.before="0">for an individual and a corporation—the individual or a member of the individual’s family—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.3-para1.b-para2.i" guid="_2c1c7c7b-74a4-4a00-8018-a5f8173a8835" provision.type="other"><no>(i)</no><block><txt break.before="0">is a majority shareholder, director or secretary of the corporation or a related body corporate of the corporation; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.3-para1.b-para2.ii" guid="_d59c02a3-23eb-4d56-8211-0c76184546f8" provision.type="other"><no>(ii)</no><block><txt break.before="0">has an interest of 50% or more in the corporation; or</txt></block></li></list></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.3-para1.c" guid="_c0a10584-847d-47f4-b1c0-ba4da0626113" provision.type="other"><no>(c)</no><block><txt break.before="0">for an individual and a trustee of a trust—the individual or a related entity under another provision of this section is a beneficiary of the trust; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.3-para1.d" guid="_6e308bc2-e996-4f65-8247-8971fcda82dd" provision.type="other"><no>(d)</no><block><txt break.before="0">for corporations—they are related bodies corporate; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.3-para1.e" guid="_a8ba02dd-3ad3-4e2d-a41b-07d115f233b2" provision.type="other"><no>(e)</no><block><txt break.before="0">for a corporation and a trustee of a trust—the corporation or a related entity under another provision of this section is a beneficiary of the trust; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.3-para1.f" guid="_9ee05455-5908-435b-ab39-ba087e8d8841" provision.type="other"><no>(f)</no><block><txt break.before="0">for trustees of 2 or more trusts—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.3-para1.f-para2.i" guid="_313b6706-4ac1-4381-978e-30f58a265283" provision.type="other"><no>(i)</no><block><txt break.before="0">a person is a beneficiary of both trusts; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.3-para1.f-para2.ii" guid="_f7982ac6-73c2-48b9-b829-b31342f52423" provision.type="other"><no>(ii)</no><block><txt break.before="0">a person is a beneficiary of 1 trust and a related entity under another provision of this section is a beneficiary of the other trust.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.4" guid="_27502040-e27f-4ab3-998a-9831036dff23" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.4-def.family_" guid="_02161776-fc09-42e7-a754-1ec40185860d" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.4-def.family" guid="_20520cdd-debe-4cb0-b7f8-3884833cf1db" type="definition">family</defterm>, for a person, means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.4-def.family-para1.a" guid="_576fde12-d589-4016-a61d-88cc1c1dcff0" provision.type="other"><no>(a)</no><block><txt break.before="0">the person’s spouse; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.4-def.family-para1.b" guid="_b256701f-a2a7-48e8-b640-90525c6c0926" provision.type="other"><no>(b)</no><block><txt break.before="0">a parent of the person or the person’s spouse; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.4-def.family-para1.c" guid="_868cfcf1-4d1c-418d-ab96-6d072a8dca31" provision.type="other"><no>(c)</no><block><txt break.before="0">a grandparent of the person or the person’s spouse; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.4-def.family-para1.d" guid="_ffc1137e-2101-4fca-a96f-75ff0b32a191" provision.type="other"><no>(d)</no><block><txt break.before="0">a brother, sister, nephew or niece of the person or the person’s spouse; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.4-def.family-para1.e" guid="_55d3e97e-fe14-4533-b485-4a3f2d01f51c" provision.type="other"><no>(e)</no><block><txt break.before="0">a child of the person or the person’s spouse; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.4-def.family-para1.f" guid="_5cf8e6eb-b412-4c2f-8ced-6cf1012788cf" provision.type="other"><no>(f)</no><block><txt break.before="0">a grandchild of the person; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.4-def.family-para1.g" guid="_4d95871b-9fb5-4f64-b257-391a1c5dc5cb" provision.type="other"><no>(g)</no><block><txt break.before="0">the spouse of any person mentioned in paragraphs (b) to (f).</txt></block></li></list></definition><definition id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.4-def.insolvent_" guid="_a7309b3c-e9a5-45c6-a8f5-23a678ba646d" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.4-def.insolvent" guid="_78ea2ef5-bbd2-4a6d-8c16-c0009949298c" type="definition">insolvent</defterm> means insolvent under the <legref jurisd="QLD" type="act" check="invalid"><name emphasis="no">Corporations Act</name></legref>, section 95A(2).</txt></definition><definition id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.4-def.operator_" guid="_d05e7203-04ec-4d11-851e-582b3dcf5643" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.4-def.operator" guid="_dcea450a-3c75-40b4-a364-746f9ef8f4ea" type="definition">operator</defterm>, of a waste disposal site, includes a former operator of the site.</txt></definition><definition id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.4-def.relatedbodycorporate_" guid="_084603b8-5350-45c9-a487-63ba3ad9cc2d" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.4-def.relatedbodycorporate" guid="_2db52436-30cb-46df-bb74-319ed317c94d" type="definition">related body corporate</defterm> see the <legref jurisd="QLD" type="act" check="invalid"><name emphasis="no">Corporations Act</name></legref>, section 50.</txt></definition><definition id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.4-def.summarydatareturn_" guid="_012bde8a-02bc-46c5-9de4-6fcde85bba25" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72K-ssec.4-def.summarydatareturn" guid="_4f6ff0b2-b54d-46bb-be45-b5bd5626b9ed" type="definition">summary data return</defterm> see section 72(5).</txt></definition></deflist></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72L" guid="_e7859db9-51fb-48a9-a948-3dda1da074d7" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>72L</no><heading id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72L-he" guid="_6b280e2b-854a-4210-a854-47c4667c3540">Application for bad debt credit</heading><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72L-ssec.1" guid="_ecb80ad3-8a32-4aaa-a10f-62287ec58b2a" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator or former operator of a waste disposal site who is eligible for a bad debt credit may apply to the chief executive for relief.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72L-ssec.2" guid="_6f6fd281-db36-4aac-8c37-f873c92d1299" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The application must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72L-ssec.2-para1.a" guid="_2428528b-d94b-444f-b4b6-42b7807035a3" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72L-ssec.2-para1.b" guid="_6261e9e4-e226-47a2-b4ed-81d921628b06" provision.type="other"><no>(b)</no><block><txt break.before="0">be supported by enough information to allow the chief executive to decide the application.</txt></block></li></list></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72M" guid="_f128de6b-701e-4f2b-ba7a-26a9c8eac6eb" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>72M</no><heading id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72M-he" guid="_f960bc50-927e-475d-8332-e023ffb0d110">Chief executive may require additional information or documents</heading><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72M-ssec.1" guid="_03f9b738-2b3a-4a50-87ee-5f830e64232f" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">Within 28 days after receiving a bad debt credit application, the chief executive may, by notice given to the applicant, require the applicant to give the chief executive further reasonable information or documents about the application by a reasonable day stated in the notice.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72M-ssec.2" guid="_deef7d5c-af55-4bf1-baa0-d44e3e862b59" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The applicant may, before the stated day, agree with the chief executive about extending the time for providing the further information or documents.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72M-ssec.3" guid="_004db3bb-2e7a-4172-8341-fe66933b79ba" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The application is taken to be withdrawn if the applicant does not give the chief executive the further information or documents by the stated day or the end of any extension agreed between the chief executive and the applicant.</txt></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72N" guid="_c9a9f6bd-a589-400e-91ac-7074a802ef04" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>72N</no><heading id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72N-he" guid="_de17f6a0-4a3c-4546-988f-f47adff2d1e3">Deciding application</heading><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72N-ssec.1" guid="_4b6b95e1-2726-46a5-ac75-53f99dd2596f" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must decide either to grant or refuse a bad debt credit application within 30 days after the later of the following days—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72N-ssec.1-para1.a" guid="_58d49931-af80-44b6-8415-7cf57cead4d5" provision.type="other"><no>(a)</no><block><txt break.before="0">the day the chief executive receives the application;</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72N-ssec.1-para1.b" guid="_c340636e-9291-4c3f-863e-71724f27d8b2" provision.type="other"><no>(b)</no><block><txt break.before="0">if additional information or documents are requested under section&#160;72M—the day the chief executive receives the information or documents.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72N-ssec.2" guid="_1e27fa5f-9898-490c-a36f-7d21a789940f" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">In deciding whether to grant or refuse the application, the chief executive must consider the information included in the application.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72N-ssec.3" guid="_2ba269eb-51b2-4211-82d8-a1000afcbb58" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72N-ssec.3-para1.a" guid="_0c54d77a-5dc8-4472-a6ab-8d50a8e8f340" provision.type="other"><no>(a)</no><block><txt break.before="0">grant a bad debt credit application if the applicant is eligible for the credit; or</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72N-ssec.3-para1.b" guid="_b187b3dc-7ba5-4fe6-9978-f9ce7cb69ed6" provision.type="other"><no>(b)</no><block><txt break.before="0">refuse a bad debt credit application if the applicant is not eligible for the credit.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72N-ssec.4" guid="_c22a2a8d-3a81-481b-b79b-d868b4c81364" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">A failure to make a decision within the period required is taken to be a decision by the chief executive to refuse the application.</txt></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72O" guid="_e018447e-4d8d-482f-8f79-e4b5a7e29598" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>72O</no><heading id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72O-he" guid="_ff5369c3-082a-4bd4-b18f-f6867a027ee0">Grant of application</heading><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72O-ssec.1" guid="_284c2a3c-c987-46bf-97a8-0e90920708bd" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">If the chief executive decides to grant a bad debt credit application, the chief executive must, within 5 business days after granting the application, give the applicant a notice stating—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72O-ssec.1-para1.a" guid="_dd1758b1-c5b7-497f-9d68-1fe9b05bcf0d" provision.type="other"><no>(a)</no><block><txt break.before="0">the application has been granted; and</txt></block></li><li id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72O-ssec.1-para1.b" guid="_a5068840-3fc6-41a1-bd0f-0623014fa21e" provision.type="other"><no>(b)</no><block><txt break.before="0">the amount of the bad debt credit.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72O-ssec.2" guid="_4898cef4-88c8-49e1-b215-55520558093c" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must also include or be accompanied by an information notice for the decision in relation to the amount of the bad debt credit.</txt></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72P" guid="_70c3d1cf-e18c-44c9-a799-7af25fb1b811" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>72P</no><heading id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72P-he" guid="_2e1e706a-5fd1-465b-b9e0-79e19ae06422">Refusal of application</heading><block><txt break.before="1">If the chief executive decides to refuse a bad debt credit application, the chief executive must, within 5 business days after refusing the application, give the applicant an information notice for the decision.</txt></block></clause><clause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72Q" guid="_82dc7413-532f-4d30-a72c-784119bb28c2" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>72Q</no><heading id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72Q-he" guid="_5aee4b18-3319-47c0-82df-05903afe14d0">Payment of bad debt credit</heading><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72Q-ssec.1" guid="_3aa1ac57-872b-4514-9502-264edc3e57e4" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the chief executive decides to grant a bad debt credit application.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72Q-ssec.2" guid="_97ac01eb-68ea-4150-9ab1-ad86226a0cc5" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive must deduct the amount of the bad debt credit from the waste levy amount the applicant is required to remit to the State under section 56 for the relevant levy period.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72Q-ssec.3" guid="_34149ba0-2596-442a-a0b2-79d7d7caba32" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, if the total amount of the bad debt credit is more than the amount the applicant is required to remit to the State, the chief executive must pay the applicant an amount equal to the excess.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72Q-ssec.4" guid="_cdc17726-8e45-4e40-bab9-1ea76df6580a" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">If the applicant is no longer the operator of a waste disposal site, the chief executive must pay the applicant an amount equal to the bad debt credit.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72Q-ssec.5" guid="_efba1ac8-db85-4183-866d-116b41953694" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72Q-ssec.5-def.relevantlevyperiod_" guid="_f92ff8d5-aa3d-4892-bef3-c4fda7c11a45" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.5-div.3-sdiv.4-sec.72Q-ssec.5-def.relevantlevyperiod" guid="_3504ccd6-311a-47e5-9726-c7c09700d337" type="definition">relevant levy period</defterm>, for an application, means the levy period at the time the application is decided.</txt></definition></deflist></block></subclause></clause></subdivision></division></part><part id="sec.6-frag-ch.3-pt.6" guid="_8255a9a1-279d-4f57-a1fb-1f43497db173" affected.by.uncommenced="0"><no>Part 6</no><heading id="sec.6-frag-ch.3-pt.6-he" guid="_7df7caf1-ff68-4429-a905-ac653341e2fa">Resource recovery area</heading><division id="sec.6-frag-ch.3-pt.6-div.1" guid="_c2e9bd0a-e73f-4c1c-84e6-843615d0cb79" affected.by.uncommenced="0"><no>Division 1</no><heading id="sec.6-frag-ch.3-pt.6-div.1-he" guid="_8244e9a3-1129-499a-bb97-3479f4b62e38">Declaration of resource recovery area</heading><clause id="sec.6-frag-ch.3-pt.6-div.1-sec.72R" guid="_397c301e-d479-415c-9149-5d779b70dff0" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>72R</no><heading id="sec.6-frag-ch.3-pt.6-div.1-sec.72R-he" guid="_915ae74b-aff7-4bb3-83ef-8372298ded81">Resource recovery area</heading><block><txt break.before="1">The operator of a waste disposal site may declare an area within the site as a <defterm id="sec.6-frag-ch.3-pt.6-div.1-def.resourcerecoveryarea" guid="_175b556b-f81b-4ea8-9e2d-13e4f1e6d7fe" type="definition">resource recovery area</defterm> if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72R-para1.a" guid="_8a948673-8be1-471a-8bdd-9c180e5debb4" provision.type="other"><no>(a)</no><block><txt break.before="0">a recycling activity is conducted in the area; and</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72R-para1.b" guid="_ca91a3eb-97ae-4e52-bc01-c44aa0a43463" provision.type="other"><no>(b)</no><block><txt break.before="0">the operator, or another entity that is responsible for the operation of the area, holds all licences, environmental authorities or other approvals required for conducting the recycling activity in the area; and</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72R-para1.c" guid="_f82f1d53-2039-427c-a3c4-ad9d0b9d4f00" provision.type="other"><no>(c)</no><block><txt break.before="0">a physical barrier—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72R-para1.c-para2.i" guid="_8d923dc6-a1f2-41b7-88a9-1845fcc2513c" provision.type="other"><no>(i)</no><block><txt break.before="0">separates the area from the rest of the site; and</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72R-para1.c-para2.ii" guid="_9f828c65-7665-4acc-8685-01187dd3ed0c" provision.type="other"><no>(ii)</no><block><txt break.before="0">prevents vehicles from moving between the area and the rest of the site other than through points of access shown on the plan of the site accompanying a notice under section 72S or 72U; and</txt></block></li></list></block></li><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72R-para1.d" guid="_3d712bae-b8ec-4569-8cd8-d9b5f51f5e15" provision.type="other"><no>(d)</no><block><txt break.before="0">the area and the physical barrier comply with the requirements prescribed by regulation for the area and barrier; and</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72R-para1.e" guid="_973b8539-5204-43be-b08e-19c3d9aa85a3" provision.type="other"><no>(e)</no><block><txt break.before="0">there has not, within the last year, been a revocation of a declaration of a resource recovery area at the site.</txt></block></li></list></block></clause><clause id="sec.6-frag-ch.3-pt.6-div.1-sec.72S" guid="_92c9a89d-d8f8-4a9e-ac06-5232ee943afe" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>72S</no><heading id="sec.6-frag-ch.3-pt.6-div.1-sec.72S-he" guid="_0f753505-7b15-4a54-85b6-ce23a90ecfa9">Declaration of resource recovery area</heading><subclause id="sec.6-frag-ch.3-pt.6-div.1-sec.72S-ssec.1" guid="_fabaf783-73d7-4ba8-a6b8-beaa5fcba590" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a waste disposal site declares a resource recovery area by giving the chief executive notice of a proposed resource recovery area at least 20 days before using the area as a resource recovery area.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.1-sec.72S-ssec.2" guid="_32df3757-e350-4e12-8f6c-232ae5988a68" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72S-ssec.2-para1.a" guid="_cfddc2e1-433f-4358-bc96-ffa96aa999c1" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72S-ssec.2-para1.b" guid="_33bddd0a-b24f-403d-90a9-579faabeaff2" provision.type="other"><no>(b)</no><block><txt break.before="0">state the day the declaration takes effect; and</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72S-ssec.2-para1.c" guid="_fd185923-355c-44b4-ba11-d7c3e60e8afe" provision.type="other"><no>(c)</no><block><txt break.before="0">include a description of the activities to be carried out in the resource recovery area; and</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72S-ssec.2-para1.d" guid="_919662b9-197b-44fe-9810-daab17369c29" provision.type="other"><no>(d)</no><block><txt break.before="0">be accompanied by a plan of the waste disposal site indicating the resource recovery area and clearly showing—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72S-ssec.2-para1.d-para2.i" guid="_6f228129-150d-4374-b246-6f530dc21e83" provision.type="other"><no>(i)</no><block><txt break.before="0">the physical barrier between the area and the rest of the site; and</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72S-ssec.2-para1.d-para2.ii" guid="_cffeadfe-58db-40ca-b43e-df23c71d6894" provision.type="other"><no>(ii)</no><block><txt break.before="0">the points of access allowing vehicles to move between the area and the rest of the site; and</txt></block></li></list></block></li><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72S-ssec.2-para1.e" guid="_d5a3cd0a-1d18-4ee0-addd-1e6a0f85bb18" provision.type="other"><no>(e)</no><block><txt break.before="0">be signed by the operator and any other entity that will be responsible for the area.</txt></block></li></list></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.6-div.1-sec.72T" guid="_7bc4662f-c83b-464e-8e10-db7b8479ff61" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>72T</no><heading id="sec.6-frag-ch.3-pt.6-div.1-sec.72T-he" guid="_5a94b491-0381-405d-93bf-bed74edfe307">Effect of declaration of resource recovery area</heading><block><txt break.before="1">If the requirements under this division for the declaration or amendment of a resource recovery area have been complied with, and the declaration has not been cancelled or revoked—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72T-para1.a" guid="_772c35e6-e989-4903-ad1e-1ea73dfbb6f1" provision.type="other"><no>(a)</no><block><txt break.before="0">the resource recovery area is not part of the levyable waste disposal site whose operator made the declaration; and</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72T-para1.b" guid="_748691b5-86cd-4344-868f-bab271a25ffc" provision.type="other"><no>(b)</no><block><txt break.before="0">all waste that is moved from the resource recovery area to the levyable waste disposal site is, for the purposes of the waste levy, taken to be waste delivered to the levyable waste disposal site.</txt><note id="sec.6-frag-ch.3-pt.6-div.1-sec.72T-para1.b-note" guid="_63834171-07a5-49f2-8e7a-9fccd75ee6eb" type="example"><heading id="sec.6-frag-ch.3-pt.6-div.1-sec.72T-para1.b-note-he" guid="_97decf31-05b3-4ce8-b064-1a5e450299df">Note—</heading><block><txt break.before="1">If levyable waste is delivered to a levyable waste disposal site, the waste levy on the waste may be payable under section 36.</txt></block></note></block></li></list></block></clause><clause id="sec.6-frag-ch.3-pt.6-div.1-sec.72U" guid="_5d003d1e-5b3b-45b7-9653-3f35d128b2aa" affected.by.uncommenced="0" spent.amends="0" provision.type="amend"><no>72U</no><heading id="sec.6-frag-ch.3-pt.6-div.1-sec.72U-he" guid="_5c0036b5-511f-4b5f-b9ac-8b429f117577">Amendment of resource recovery area</heading><subclause id="sec.6-frag-ch.3-pt.6-div.1-sec.72U-ssec.1" guid="_32f31ca3-0668-4f60-a36a-6891f8b4d3fd" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a waste disposal site for which a resource recovery area has been declared may amend the area’s declaration as a resource recovery area by giving the chief executive notice of the proposed amendment at least 20 days before the amendment is to take effect.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.1-sec.72U-ssec.2" guid="_52f37409-c476-4799-9845-d97917ab3c11" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72U-ssec.2-para1.a" guid="_fd0faab8-1b20-4cae-8507-9edad61a616a" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72U-ssec.2-para1.b" guid="_1e658da0-3a2a-4f70-8522-0cd8e07f7c7b" provision.type="other"><no>(b)</no><block><txt break.before="0">state the day the amendment takes effect; and</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72U-ssec.2-para1.c" guid="_f7764f0e-9cd5-468e-ab32-ef77cf6aaad9" provision.type="other"><no>(c)</no><block><txt break.before="0">if the recycling activities to be conducted in the amended resource recovery area differ from the activities currently carried out in the area—include a description of the recycling activities to be conducted in the amended resource recovery area; and</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72U-ssec.2-para1.d" guid="_26990fbd-163e-478c-ac77-74fd6b07719a" provision.type="other"><no>(d)</no><block><txt break.before="0">be accompanied by a plan of the waste disposal site indicating the amended resource recovery area and clearly showing—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72U-ssec.2-para1.d-para2.i" guid="_efa74caa-47a0-4fba-b17e-a343179f3ff1" provision.type="other"><no>(i)</no><block><txt break.before="0">the physical barrier between the area and the rest of the site; and</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72U-ssec.2-para1.d-para2.ii" guid="_2d5d5995-09c2-4a3f-ade1-f08c40a2e8ea" provision.type="other"><no>(ii)</no><block><txt break.before="0">the points of access allowing vehicles to move between the area and the rest of the site; and</txt></block></li></list></block></li><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72U-ssec.2-para1.e" guid="_795a8e10-a450-4020-9d24-2a3760d648a9" provision.type="other"><no>(e)</no><block><txt break.before="0">be signed by the operator and any other entity that will be responsible for the area.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.1-sec.72U-ssec.3" guid="_5386b902-7439-48e0-967a-cb6b997c87d3" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The operator need not act under subsection (1) if the only change to the resource recovery area is a change to—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72U-ssec.3-para1.a" guid="_b67cf431-7924-4cb4-adda-4b826b789f94" provision.type="other"><no>(a)</no><block><txt break.before="0">the recycling activities conducted in the area; or</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72U-ssec.3-para1.b" guid="_5ecac942-8689-4781-8634-8f50df50867b" provision.type="other"><no>(b)</no><block><txt break.before="0">the physical barrier or points of access for the area that do not change the boundaries of the area; or</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72U-ssec.3-para1.c" guid="_c3338b7b-1631-4912-a935-d13a226308ef" provision.type="other"><no>(c)</no><block><txt break.before="0">the entity having responsibility for the operation of the area.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.1-sec.72U-ssec.4" guid="_3dce5fbf-ff4c-4f9b-b4b7-378b1c6fb709" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">If an amendment of a resource recovery area under this section results in a part of the area being within the levyable waste disposal site—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72U-ssec.4-para1.a" guid="_0a2c8b32-e67e-47fa-99a0-15c48202ccfb" provision.type="other"><no>(a)</no><block><txt break.before="0">that part of the area becomes part of the site; and</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72U-ssec.4-para1.b" guid="_c247a7bd-e7f1-4118-9fa2-6d553a33eb13" provision.type="other"><no>(b)</no><block><txt break.before="0">all waste within that part of the area is, for the purposes of the waste levy, taken to be waste delivered to the site.</txt><note id="sec.6-frag-ch.3-pt.6-div.1-sec.72U-ssec.4-para1.b-note" guid="_ef14f95e-74df-4d65-8670-e2f5aa6667c4" type="example"><heading id="sec.6-frag-ch.3-pt.6-div.1-sec.72U-ssec.4-para1.b-note-he" guid="_711e6c88-0d9f-4354-86f4-0036205389e8">Note—</heading><block><txt break.before="1">If levyable waste is delivered to a levyable waste disposal site, the waste levy on the waste may be payable under section 36.</txt></block></note></block></li></list></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.6-div.1-sec.72V" guid="_72718cbb-4680-464f-a8ba-c4718c7fb47a" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>72V</no><heading id="sec.6-frag-ch.3-pt.6-div.1-sec.72V-he" guid="_10e12361-2cf3-41fb-89e1-6ad9d5ba224e">Cancellation of resource recovery area</heading><subclause id="sec.6-frag-ch.3-pt.6-div.1-sec.72V-ssec.1" guid="_13d6e4d5-034b-4069-a31a-8a69b77461b3" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a waste disposal site for which a resource recovery area has been declared may cancel the area’s declaration as a resource recovery area by giving the chief executive notice of the proposed cancellation at least 30 days before the cancellation is to take effect.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.1-sec.72V-ssec.2" guid="_eef5ed99-d31a-4154-953b-8ceaa799499e" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The notice must state the day the cancellation takes effect.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.1-sec.72V-ssec.3" guid="_600f9208-da8c-43e5-9f2c-a511c4fd987e" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">If a resource recovery area is cancelled under this section—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72V-ssec.3-para1.a" guid="_f8b4705f-603d-4c5e-a072-94ee05f845a3" provision.type="other"><no>(a)</no><block><txt break.before="0">the cancelled area becomes part of the levyable waste disposal site; and</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72V-ssec.3-para1.b" guid="_9246b299-499b-4801-99c1-94acc84819a5" provision.type="other"><no>(b)</no><block><txt break.before="0">all waste within the cancelled area is, for the purposes of the waste levy, taken to be waste delivered to the levyable waste disposal site.</txt><note id="sec.6-frag-ch.3-pt.6-div.1-sec.72V-ssec.3-para1.b-note" guid="_5c52be94-3ef6-4973-bbd8-1b8563fb7fdd" type="example"><heading id="sec.6-frag-ch.3-pt.6-div.1-sec.72V-ssec.3-para1.b-note-he" guid="_adeef312-c80a-4c82-b19b-4a9865038a0c">Note—</heading><block><txt break.before="1">If levyable waste is delivered to a levyable waste disposal site, the waste levy on the waste may be payable under section 36.</txt></block></note></block></li></list></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.6-div.1-sec.72W" guid="_51c20d66-27de-4fda-b46d-c708ec591c11" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>72W </no><heading id="sec.6-frag-ch.3-pt.6-div.1-sec.72W-he" guid="_d9970eb1-295f-4a79-8317-fe7709c57165">Revocation of resource recovery area by chief executive</heading><subclause id="sec.6-frag-ch.3-pt.6-div.1-sec.72W-ssec.1" guid="_f8d1c09d-95a3-45fa-bb2e-4aefdb0fda61" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may revoke a declaration by the operator of a waste disposal site of an area as a resource recovery area if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72W-ssec.1-para1.a" guid="_065f780f-8a69-452f-8116-e3a77c13516f" provision.type="other"><no>(a)</no><block><txt break.before="0">there is an active landfill cell within the area; or</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72W-ssec.1-para1.b" guid="_5bc67169-eb84-42a5-8f81-5edc427d9744" provision.type="other"><no>(b)</no><block><txt break.before="0">the amount of waste, including recyclable waste, stockpiled in the area is greater than the total amount of waste delivered to the area in the previous 12 months; or</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72W-ssec.1-para1.c" guid="_e454cd82-0aa1-4156-a227-d6d0ec4f5983" provision.type="other"><no>(c)</no><block><txt break.before="0">the operator or another entity having responsibility for the operation of the resource recovery area is convicted of an offence under this part; or</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72W-ssec.1-para1.d" guid="_ee883f82-4ec5-4521-b4b4-a857622acd12" provision.type="other"><no>(d)</no><block><txt break.before="0">the chief executive is satisfied the area does not fulfil, or no longer fulfils, the requirements under section 72R for an area to be declared as a resource recovery area.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.1-sec.72W-ssec.2" guid="_c207fbd1-66da-48f2-82a6-f9e44a112b12" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">Before revoking the declaration (the <defterm id="sec.6-frag-ch.3-pt.6-div.1-sec.72W-def.proposedaction" guid="_8ac00b44-f46f-4df1-9b0d-eec1b6a65e0f" type="definition">proposed action</defterm>), the chief executive must give notice to the operator of the waste disposal site stating all of the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72W-ssec.2-para1.a" guid="_66e2188a-35e4-4e73-8af8-00422a625c07" provision.type="other"><no>(a)</no><block><txt break.before="0">the proposed action;</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72W-ssec.2-para1.b" guid="_55175d36-f547-4756-adf9-7dddc782f895" provision.type="other"><no>(b)</no><block><txt break.before="0">the grounds for taking the proposed action;</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72W-ssec.2-para1.c" guid="_cb79ca3a-f548-4ab0-9fe8-c7cff2a8c327" provision.type="other"><no>(c)</no><block><txt break.before="0">the facts and circumstances that form the basis for the grounds;</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72W-ssec.2-para1.d" guid="_0b729cc7-7ee0-4f18-a949-17def68fd313" provision.type="other"><no>(d)</no><block><txt break.before="0">when the proposed action is intended to take effect;</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72W-ssec.2-para1.e" guid="_65507bc9-d2f9-4421-b414-c3f1a28cb3b2" provision.type="other"><no>(e)</no><block><txt break.before="0">that the operator may make, within a stated period, written submissions to show why the proposed action should not be taken.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.1-sec.72W-ssec.3" guid="_c45470cc-7228-403a-9b3c-b2e37f04a5a3" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The stated period for submissions must not end earlier than 21 days after the operator of the waste disposal site is given the notice.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.1-sec.72W-ssec.4" guid="_f835a46a-fb50-47ff-beef-7f8e4d0a1b1c" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive must consider all submissions made under subsection (2)(e).</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.1-sec.72W-ssec.5" guid="_a0b99354-741b-4c02-851f-79e8be48e699" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">If the chief executive decides to take the proposed action, the chief executive must, within 10 business days after making the decision, give the operator of the waste disposal site an information notice for the decision.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.1-sec.72W-ssec.6" guid="_985a03ea-226f-4041-af79-7dad79ef0c01" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block><txt break.before="0">The decision takes effect when the information notice is given.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.1-sec.72W-ssec.7" guid="_64761c1b-23f5-4feb-8b57-78d80a6647b2" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block><txt break.before="0">If a resource recovery area is revoked under this section—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72W-ssec.7-para1.a" guid="_54190410-f711-4277-815b-a28d330f57e3" provision.type="other"><no>(a)</no><block><txt break.before="0">the area becomes part of the levyable waste disposal site; and</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.1-sec.72W-ssec.7-para1.b" guid="_62a56c73-2260-4f87-8f2d-75ab78722ba8" provision.type="other"><no>(b)</no><block><txt break.before="0">all waste within the area is, for the purposes of the waste levy, taken to be waste delivered to the levyable waste disposal site.</txt><note id="sec.6-frag-ch.3-pt.6-div.1-sec.72W-ssec.7-para1.b-note" guid="_8c9d0d3f-666a-4c50-8e16-e92abbed5851" type="example"><heading id="sec.6-frag-ch.3-pt.6-div.1-sec.72W-ssec.7-para1.b-note-he" guid="_0995c07a-1f5e-4354-a61d-6a52e53a5cdb">Note—</heading><block><txt break.before="1">If levyable waste is delivered to a levyable waste disposal site, the waste levy on the waste may be payable under section 36.</txt></block></note></block></li></list></block></subclause></clause></division><division id="sec.6-frag-ch.3-pt.6-div.2" guid="_1f205c81-12d9-498d-bc4b-44fc35069eab" affected.by.uncommenced="0"><no>Division 2	</no><heading id="sec.6-frag-ch.3-pt.6-div.2-he" guid="_de2dbf6f-3b3d-498b-b05f-845e354818bc">Obligations relating to resource recovery area</heading><clause id="sec.6-frag-ch.3-pt.6-div.2-sec.72X" guid="_9b1aee8d-3b0d-417d-8749-4d53bf8e8ce3" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>72X</no><heading id="sec.6-frag-ch.3-pt.6-div.2-sec.72X-he" guid="_341b3cf9-fc7a-4ea4-bdff-55aeca774985">Requirement to keep documents</heading><block><txt break.before="1">An entity having responsibility for the operation of a resource recovery area must keep the following documents for at least 5 years after the event that is the subject of the document happens—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.6-div.2-sec.72X-para1.a" guid="_9250824a-c597-43b4-8a26-542e3f908b64" provision.type="other"><no>(a)</no><block><txt break.before="0">any document that records waste delivered to the area, including its measurements;</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.2-sec.72X-para1.b" guid="_e6007e84-66e0-455f-a9bc-a38d1dd93f13" provision.type="other"><no>(b)</no><block><txt break.before="0">any document that records waste or other material removed from the area as mentioned in section 59(d), including its measurements;</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.2-sec.72X-para1.c" guid="_8085546f-8227-41c1-8f19-ba9bc03d4fa6" provision.type="other"><no>(c)</no><block><txt break.before="0">a copy of the results of a volumetric survey of the area carried out under section 72Y or 72Z;</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.2-sec.72X-para1.d" guid="_6b3d124b-6f42-4c81-affb-c0a5cd7629d0" provision.type="other"><no>(d)</no><block><txt break.before="0">any document that records any other event for the area as prescribed by regulation.</txt></block></li></list><penalty id="sec.6-frag-ch.3-pt.6-div.2-sec.72X-pen" guid="_b4be21cf-00a4-4f17-a4ce-7e1618117eca"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></block></clause><clause id="sec.6-frag-ch.3-pt.6-div.2-sec.72Y" guid="_efc6f88f-77d8-422f-b435-62aafa7b21da" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>72Y</no><heading id="sec.6-frag-ch.3-pt.6-div.2-sec.72Y-he" guid="_96b6e090-906b-47ac-88ac-4a6485dc3d19">Volumetric survey for resource recovery area in waste levy zone</heading><subclause id="sec.6-frag-ch.3-pt.6-div.2-sec.72Y-ssec.1" guid="_9a920e9e-28c2-4673-8175-16fb9f58c6ad" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">From 1 June 2020, this section applies for a resource recovery area for a waste disposal site in the waste levy zone.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.2-sec.72Y-ssec.2" guid="_b98551d3-94ab-4198-b332-7cb76e3cce33" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The entity having responsibility for the operation of the resource recovery area must, in each year—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.6-div.2-sec.72Y-ssec.2-para1.a" guid="_6e02e9a9-2230-4f8c-b5e5-6f6dd2ff530f" provision.type="other"><no>(a)</no><block><txt break.before="0">ensure that a volumetric survey is carried out in June for all stockpiled waste at the resource recovery area; and</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.2-sec.72Y-ssec.2-para1.b" guid="_f3985d1c-64aa-482a-990b-40743171f863" provision.type="other"><no>(b)</no><block><txt break.before="0">give the chief executive a copy of the results of the volumetric survey in the approved form before the end of July.</txt></block></li></list></block><penalty id="sec.6-frag-ch.3-pt.6-div.2-sec.72Y-ssec.2-pen" guid="_cd2f2f5f-80b5-4208-84a0-08f8c70be6d1"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.2-sec.72Y-ssec.3" guid="_676f94ef-b03f-4a5c-8c07-fd9adfb88f81" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The volumetric survey must be carried out in compliance with the requirements prescribed by regulation.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.2-sec.72Y-ssec.4" guid="_8476c038-aa4d-4430-a33a-ae5507af3999" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">The results of the volumetric survey must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.6-div.2-sec.72Y-ssec.4-para1.a" guid="_5285b986-4019-4717-b29f-63d6d8a0bc4f" provision.type="other"><no>(a)</no><block><txt break.before="0">be in electronic form; and</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.2-sec.72Y-ssec.4-para1.b" guid="_592b81d4-1fe0-4c2d-97fc-d609e6bdb81d" provision.type="other"><no>(b)</no><block><txt break.before="0">include a topographical plan complying with the specifications advised by the chief executive; and</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.2-sec.72Y-ssec.4-para1.c" guid="_358875ca-4706-42ef-adb4-136282fd2c6c" provision.type="other"><no>(c)</no><block><txt break.before="0">include details of the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.6-div.2-sec.72Y-ssec.4-para1.c-para2.i" guid="_cdc31ddd-6d05-40ba-a16e-2f5929cfe4aa" provision.type="other"><no>(i)</no><block><txt break.before="0">the area of the resource recovery area;</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.2-sec.72Y-ssec.4-para1.c-para2.ii" guid="_c432f23c-164d-4d1c-b180-0dd925b8508f" provision.type="other"><no>(ii)</no><block><txt break.before="0">the stockpiles of waste, including recyclable waste, at the area; and</txt></block></li></list></block></li><li id="sec.6-frag-ch.3-pt.6-div.2-sec.72Y-ssec.4-para1.d" guid="_b09914f2-091b-4220-a447-3bb808d3c4d9" provision.type="other"><no>(d)</no><block><txt break.before="0">be certified as accurate by a surveyor under the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-2003-070" target.version.series="58bf4472-9a2d-4809-9f04-c4ff625373da"><name emphasis="yes">Surveyors Act 2003</name></legref>.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.2-sec.72Y-ssec.5" guid="_dae178d1-cd68-40b7-9eec-43e2fba01bbe" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">This section continues to apply to the entity having responsibility for the operation of the resource recovery area even if the declaration of the area as a resource recovery area is cancelled or revoked.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.2-sec.72Y-ssec.6" guid="_292c1a0e-3a8a-446b-a833-c187059d6d4a" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block><txt break.before="0">However, if a matter mentioned in subsection (5) happens, the carrying out of the survey and the giving of a copy of the results to the chief executive may happen earlier than when otherwise required under subsection (2).</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.2-sec.72Y-ssec.7" guid="_25960dbe-5084-493d-88d5-89a5099cf3e5" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block><txt break.before="0">This section does not apply to a resource recovery area for a small site until 1 June 2022.</txt></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.6-div.2-sec.72Z" guid="_4e0e61cc-8c69-45ea-b27f-96129d96e751" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>72Z</no><heading id="sec.6-frag-ch.3-pt.6-div.2-sec.72Z-he" guid="_8408a7d2-3d50-49a4-8687-8314462d5a3a">Volumetric survey for resource recovery area in non-levy zone</heading><subclause id="sec.6-frag-ch.3-pt.6-div.2-sec.72Z-ssec.1" guid="_2fd4ce42-cbd5-49db-8799-7e322e51f865" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies for a resource recovery area declared for a waste disposal site if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.6-div.2-sec.72Z-ssec.1-para1.a" guid="_e5584418-1058-414c-a28f-a136eeb2bd6c" provision.type="other"><no>(a)</no><block><txt break.before="0">the site is in the non-levy zone; and</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.2-sec.72Z-ssec.1-para1.b" guid="_1af57175-39fc-4cbb-9257-336a287ba3e5" provision.type="other"><no>(b)</no><block><txt break.before="0">either—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.6-div.2-sec.72Z-ssec.1-para1.b-para2.i" guid="_d0081e71-b51b-47fd-b7a7-a30de9441db6" provision.type="other"><no>(i)</no><block><txt break.before="0">from 1 July 2019 to 31 December 2019—at least 300 tonnes of levyable waste, generated outside the non-levy zone, is received at the resource recovery area; or</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.2-sec.72Z-ssec.1-para1.b-para2.ii" guid="_bfb0ee3f-b936-420b-ba1a-9f2274e2224c" provision.type="other"><no>(ii)</no><block><txt break.before="0">from 1 January 2020—at least 600 tonnes of levyable waste, generated outside the non-levy zone, is received at the resource recovery area during a year.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.2-sec.72Z-ssec.2" guid="_ca9c0f18-1807-442f-a5e8-2f7b24a082ca" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The entity having responsibility for the operation of the resource recovery area must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.6-div.2-sec.72Z-ssec.2-para1.a" guid="_5434096b-4a2d-45e4-b3a5-a77067020e04" provision.type="other"><no>(a)</no><block><txt break.before="0">before the end of June of the following year, ensure a volumetric survey is carried out for all stockpiled waste at the resource recovery area; and</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.2-sec.72Z-ssec.2-para1.b" guid="_20e62f67-0e72-4ace-80de-3b77486e7715" provision.type="other"><no>(b)</no><block><txt break.before="0">before the end of July in the following year, give the chief executive a copy of the results of the survey in the approved form.</txt></block></li></list></block><penalty id="sec.6-frag-ch.3-pt.6-div.2-sec.72Z-ssec.2-pen" guid="_855f3ca7-248c-4557-b5ec-d0c38f7c7ac6"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.2-sec.72Z-ssec.3" guid="_1fef76c2-aadd-4f17-be06-3ac395eb2dab" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The volumetric survey must be carried out in compliance with the requirements prescribed by regulation.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.2-sec.72Z-ssec.4" guid="_63c8e518-3ddb-413f-a7b3-0020a4776811" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">The results of the volumetric survey must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.6-div.2-sec.72Z-ssec.4-para1.a" guid="_d7dbc0a0-2e4d-40b7-8fe5-2a15c1541fc9" provision.type="other"><no>(a)</no><block><txt break.before="0">be in electronic form; and</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.2-sec.72Z-ssec.4-para1.b" guid="_9988251f-5432-40e6-be03-602a95416b52" provision.type="other"><no>(b)</no><block><txt break.before="0">include a topographical plan complying with specifications advised by the chief executive; and</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.2-sec.72Z-ssec.4-para1.c" guid="_9c49e12c-52df-45aa-9b88-05d48dc4c137" provision.type="other"><no>(c)</no><block><txt break.before="0">include details of the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.6-div.2-sec.72Z-ssec.4-para1.c-para2.i" guid="_4afa6506-6a59-4cac-81fc-0a4dbd463004" provision.type="other"><no>(i)</no><block><txt break.before="0">the area of the resource recovery area;</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.2-sec.72Z-ssec.4-para1.c-para2.ii" guid="_2546a3fb-643c-4d71-b31e-329765f7cbd8" provision.type="other"><no>(ii)</no><block><txt break.before="0">the stockpiles of waste, including recyclable waste, at the area; and</txt></block></li></list></block></li><li id="sec.6-frag-ch.3-pt.6-div.2-sec.72Z-ssec.4-para1.d" guid="_765cf801-290a-49a2-8c19-217eaf56f2f4" provision.type="other"><no>(d)</no><block><txt break.before="0">be certified as accurate by a surveyor under the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-2003-070" target.version.series="58bf4472-9a2d-4809-9f04-c4ff625373da"><name emphasis="yes">Surveyors Act 2003</name></legref>.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.2-sec.72Z-ssec.5" guid="_0492f4a9-83b5-4b23-83d7-f7f6ec80f11a" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">This section continues to apply to the entity having responsibility for the operation of the resource recovery area even if the declaration of the area as a resource recovery area is cancelled or revoked.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.2-sec.72Z-ssec.6" guid="_6114c4d3-b89b-457d-92f9-7e8a2a1dbb9f" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block><txt break.before="0">However, if a matter mentioned in subsection (5) happens, the carrying out of the survey and the giving of a copy of the results to the chief executive may happen earlier than when otherwise required under subsection (2).</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.2-sec.72Z-ssec.7" guid="_ff2800cb-0a67-4bbb-a0be-71faa1dc3125" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block><txt break.before="0">This section does not apply to a resource recovery area declared for a small site until 1 June 2022.</txt></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.6-div.2-sec.73" guid="_fb710bfc-15f8-4668-8851-10c648890605" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>73</no><heading id="sec.6-frag-ch.3-pt.6-div.2-sec.73-he" guid="_bea071f2-2ff8-42ca-87d5-8d67386ff956">Volumetric survey carried out by chief executive</heading><subclause id="sec.6-frag-ch.3-pt.6-div.2-sec.73-ssec.1" guid="_ef4e81a6-74fb-4605-8326-00fb9c4c23bd" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the entity having responsibility for the operation of a resource recovery area—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.6-div.2-sec.73-ssec.1-para1.a" guid="_179f509f-5f59-402b-8b64-388a1b647bc4" provision.type="other"><no>(a)</no><block><txt break.before="0">is required to carry out a volumetric survey under section 72Y(2)(a) or 72Z(2)(a); but</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.2-sec.73-ssec.1-para1.b" guid="_7bfec346-091d-44c5-93a3-d9d2672d77e2" provision.type="other"><no>(b)</no><block><txt break.before="0">fails to carry out the volumetric survey in compliance with the requirements prescribed by regulation.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.2-sec.73-ssec.2" guid="_4a009b80-f471-40db-9e07-1f0e9af45913" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The chief executive may arrange for the volumetric survey to be carried out at the resource recovery area and for that purpose may direct an authorised person to enter the area to facilitate the carrying out of the survey.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.2-sec.73-ssec.3" guid="_8fc76193-67d7-4c4f-9d62-2ef37ceb8e7b" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The chief executive may recover the cost of carrying out the volumetric survey from the entity as a debt payable by the entity to the State.</txt></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.6-div.2-sec.73A" guid="_b1a14151-37dd-4ee9-ab75-5cdc30d2d35b" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>73A</no><heading id="sec.6-frag-ch.3-pt.6-div.2-sec.73A-he" guid="_697ba290-d6cd-4657-be36-9f3d3cc42cf6">Obligations of entity responsible for operation of resource recovery area</heading><subclause id="sec.6-frag-ch.3-pt.6-div.2-sec.73A-ssec.1" guid="_f153b780-bb1f-4bf8-96ad-ee576a98b14d" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies if the operator of a waste disposal site has declared, or claims to have declared, an area as a resource recovery area under section 72S.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.2-sec.73A-ssec.2" guid="_37534390-d872-4c26-98c3-8466d38865a0" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The entity having responsibility for the operation of the resource recovery area must ensure—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.6-div.2-sec.73A-ssec.2-para1.a" guid="_1ced4a57-6ee7-45dc-9d3a-31de3c79d9b6" provision.type="other"><no>(a)</no><block><txt break.before="0">there is not an active landfill cell within the area; and</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.2-sec.73A-ssec.2-para1.b" guid="_4ff713ad-66c2-4fbb-b902-fb951dbf47d1" provision.type="other"><no>(b)</no><block><txt break.before="0">the area complies with the requirements for the area prescribed by regulation; and</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.2-sec.73A-ssec.2-para1.c" guid="_e0d62365-eb7c-4aee-a58c-0b499f21e8a1" provision.type="other"><no>(c)</no><block><txt break.before="0">the physical barrier between the resource recovery area and the rest of the waste disposal site complies with the requirements prescribed by regulation; and</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.2-sec.73A-ssec.2-para1.d" guid="_53d8bc1c-63be-4075-a826-d9373c0c4189" provision.type="other"><no>(d)</no><block><txt break.before="0">the points of access allowing vehicles to move between the area and the rest of the waste disposal site comply with the requirements prescribed by regulation.</txt></block></li></list></block><penalty id="sec.6-frag-ch.3-pt.6-div.2-sec.73A-ssec.2-pen" guid="_1b51d4fb-aec9-4c53-a32d-7a3026a538a1"><block><txt break.before="1">Maximum penalty—1,665 penalty units.</txt></block></penalty></subclause></clause><clause id="sec.6-frag-ch.3-pt.6-div.2-sec.73B" guid="_264dab2c-37f4-4aad-b372-6ee2190cbfad" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>73B</no><heading id="sec.6-frag-ch.3-pt.6-div.2-sec.73B-he" guid="_3d58498e-c92a-4105-b744-72a6d5109afe">False claims about resource recovery area</heading><subclause id="sec.6-frag-ch.3-pt.6-div.2-sec.73B-ssec.1" guid="_bbf9fca8-637d-459b-a203-1e8dd13cf854" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The operator of a waste disposal site must not claim to have a resource recovery area for the site if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.6-div.2-sec.73B-ssec.1-para1.a" guid="_a1b9c593-6529-43c1-8b45-a647eb9ba40a" provision.type="other"><no>(a)</no><block><txt break.before="0">the operator has not declared the area under section 72S; or</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.2-sec.73B-ssec.1-para1.b" guid="_ad9fada1-715c-42fc-8a14-c3329d11cf42" provision.type="other"><no>(b)</no><block><txt break.before="0">the declaration of the area has been cancelled or revoked under section 72V or 72W.</txt></block></li></list><penalty id="sec.6-frag-ch.3-pt.6-div.2-sec.73B-ssec.1-pen" guid="_825af062-e93c-4c0b-b15e-fdc6065f92b3"><block><txt break.before="1">Maximum penalty—1,665 penalty units.</txt></block></penalty></block></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.2-sec.73B-ssec.2" guid="_a4798809-d9c6-4b5e-b884-452d4700fc5a" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The operator of a waste disposal site must not falsely claim a part of the site is within the resource recovery area for the site.</txt><penalty id="sec.6-frag-ch.3-pt.6-div.2-sec.73B-ssec.2-pen" guid="_06ad412b-ba16-44bd-82b5-9ff402b5cf0c"><block><txt break.before="1">Maximum penalty—1,665 penalty units.</txt></block></penalty></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.6-div.2-sec.73C" guid="_8f2d66b7-1b80-40c1-bba2-647e296cf0dc" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>73C</no><heading id="sec.6-frag-ch.3-pt.6-div.2-sec.73C-he" guid="_4b7271a4-b0c4-4135-8ea5-9d7a6621760d">Changes affecting resource recovery area requiring notification</heading><subclause id="sec.6-frag-ch.3-pt.6-div.2-sec.73C-ssec.1" guid="_f89f1481-daae-4209-a028-5e902858e26c" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies for a waste disposal site if a declaration of a resource recovery area is in effect for the site.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.2-sec.73C-ssec.2" guid="_adcca344-948d-4667-b1ab-aaebb9257c3a" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">If there is a change to the physical barrier or points of access for the resource recovery area that does not change the boundaries of the area, the operator of the waste disposal site must do all of the following within 7 days after the change happens—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.6-div.2-sec.73C-ssec.2-para1.a" guid="_bc9502f7-eec1-4de7-84f4-ec80a4e3717a" provision.type="other"><no>(a)</no><block><txt break.before="0">amend the plan of the waste disposal site;</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.2-sec.73C-ssec.2-para1.b" guid="_16a5041e-8ffd-4b73-81cd-46e419f9b194" provision.type="other"><no>(b)</no><block><txt break.before="0">give the chief executive notice of the change in the approved form;</txt></block></li><li id="sec.6-frag-ch.3-pt.6-div.2-sec.73C-ssec.2-para1.c" guid="_6848d191-f589-41b2-80b4-af99198e5688" provision.type="other"><no>(c)</no><block><txt break.before="0">give the chief executive a copy of the amended plan of the waste disposal site indicating the resource recovery area and clearly showing the physical barrier and points of access for the area.</txt></block></li></list></block><penalty id="sec.6-frag-ch.3-pt.6-div.2-sec.73C-ssec.2-pen" guid="_3f56ad6f-0c5e-45e6-97db-c5e5fc7ac0b2"><block><txt break.before="1">Maximum penalty—300 penalty units.</txt></block></penalty></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.2-sec.73C-ssec.3" guid="_00a78c20-7cb8-4eaf-9275-5f5c5e9d96e1" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">If the recycling activities declared to be conducted in the resource recovery area change, the operator of the waste disposal site must advise the chief executive of the change within 7 days after the change happens.</txt></block><penalty id="sec.6-frag-ch.3-pt.6-div.2-sec.73C-ssec.3-pen" guid="_752bcc88-94d2-4e08-b31f-b96b72044c43"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></subclause><subclause id="sec.6-frag-ch.3-pt.6-div.2-sec.73C-ssec.4" guid="_d6c2879a-16c4-40a1-8b8d-10407f84684f" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">If there is a change of the entity having responsibility for the operation of the resource recovery area, the entity having responsibility for the operation of the area immediately before the change must notify the chief executive of the change within 7 days after the change happens.</txt></block><penalty id="sec.6-frag-ch.3-pt.6-div.2-sec.73C-ssec.4-pen" guid="_a9d6f182-4a09-46c2-b6fd-fba54b73bde1"><block><txt break.before="1">Maximum penalty—100 penalty units.</txt></block></penalty></subclause></clause></division></part><part id="sec.6-frag-ch.3-pt.7" guid="_049df916-b689-4348-b782-845c599b847d" affected.by.uncommenced="0"><no>Part 7</no><heading id="sec.6-frag-ch.3-pt.7-he" guid="_4b038869-c298-4c7e-bfee-d022d40bd7c2">Miscellaneous</heading><clause id="sec.6-frag-ch.3-pt.7-sec.73D" guid="_086798be-2a10-4a68-8dbd-198478fcf27d" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>73D</no><heading id="sec.6-frag-ch.3-pt.7-sec.73D-he" guid="_d4c0c00c-241f-4742-b338-63859dd513ca">Annual payment to local governments</heading><subclause id="sec.6-frag-ch.3-pt.7-sec.73D-ssec.1" guid="_9f129fdd-32a5-4b04-8378-020c5c5938c7" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must make to each local government affected by the waste levy an annual payment as prescribed by regulation.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.7-sec.73D-ssec.2" guid="_20f296c3-d484-4049-84e6-919db8a738bf" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">A local government must use the amount paid to the local government to mitigate any direct impacts of the waste levy on households in the local government’s local government area.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.7-sec.73D-ssec.3" guid="_5343ac24-6476-4750-9703-473f610c47c6" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">If the chief executive reasonably believes a local government has not used the amount paid to the local government as required, the chief executive must not make a further annual payment to the local government until it uses the amount as required.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.7-sec.73D-ssec.4" guid="_80aba387-ce04-4c12-8fde-c10c28b168d7" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">All rate notices issued by a local government during the year to which the annual payment relates must include a statement that informs the ratepayer of the amount paid to the local government and the purpose of the payment.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.7-sec.73D-ssec.5" guid="_853a233e-7903-4a12-ab04-2d48c6657cb6" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">If the chief executive reasonably believes a local government has not included the statement in the rate notices as required, the chief executive may refuse to make a further annual payment to the local government until it informs ratepayers of the amount paid and the purpose of the payment.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.7-sec.73D-ssec.6" guid="_90552349-59df-4e71-a833-ca371a88d008" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block><txt break.before="0">If the chief executive reasonably believes a local government has distributed misinformation in relation to an annual payment after receiving the payment, the chief executive may refuse to make a further annual payment to the local government until it informs the intended audience for the distribution how the misinformation is false or misleading.</txt></block></subclause><subclause id="sec.6-frag-ch.3-pt.7-sec.73D-ssec.7" guid="_2f06d625-be63-4ee7-8068-6c1ab3c8c004" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block><txt break.before="0">A local government is taken to have distributed misinformation in relation to an annual payment if the local government—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.7-sec.73D-ssec.7-para1.a" guid="_9b72919d-9033-4b05-a82c-37a187184733" provision.type="other"><no>(a)</no><block><txt break.before="0">included the misinformation in a rate notice or other document issued by the local government; or</txt></block></li><li id="sec.6-frag-ch.3-pt.7-sec.73D-ssec.7-para1.b" guid="_a088a4d5-c1e1-44dc-911e-4d7e125b6a88" provision.type="other"><no>(b)</no><block><txt break.before="0">published the misinformation on the local government’s website; or</txt></block></li><li id="sec.6-frag-ch.3-pt.7-sec.73D-ssec.7-para1.c" guid="_472deb50-af37-4c10-9a3c-4f3472798332" provision.type="other"><no>(c)</no><block><txt break.before="0">included the misinformation in an advertisement made by, or on behalf of, the local government.</txt></block></li></list></block></subclause><subclause id="sec.6-frag-ch.3-pt.7-sec.73D-ssec.8" guid="_54462ab0-b499-44ea-b2bb-048d3d13343f" affected.by.uncommenced="0" provision.type="other"><no>(8)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sec.6-frag-ch.3-pt.7-sec.73D-ssec.8-def.misinformation_" guid="_59689bfd-b3b7-4693-af59-440da31a8a46" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.7-sec.73D-ssec.8-def.misinformation" guid="_2938a0da-f2e1-4d9d-9830-4d7f30e526ae" type="definition">misinformation</defterm>, in relation to an annual payment, means a false or misleading statement about—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.7-sec.73D-ssec.8-def.misinformation-para1.a" guid="_4a06353e-cebd-4f1a-b352-a8d19b575021" provision.type="other"><no>(a)</no><block><txt break.before="0">the impact of the waste levy on a local government; or</txt></block></li><li id="sec.6-frag-ch.3-pt.7-sec.73D-ssec.8-def.misinformation-para1.b" guid="_c3ee8084-f158-4cec-a3dd-779bb5263792" provision.type="other"><no>(b)</no><block><txt break.before="0">the purpose of the annual payment; or</txt></block></li><li id="sec.6-frag-ch.3-pt.7-sec.73D-ssec.8-def.misinformation-para1.c" guid="_ecc6dbc7-690f-4670-b417-146587f82647" provision.type="other"><no>(c)</no><block><txt break.before="0">the amount of the annual payment paid to a local government.</txt></block></li></list></definition><definition id="sec.6-frag-ch.3-pt.7-sec.73D-ssec.8-def.ratenotice_" guid="_15c951f0-bebc-4e80-ad93-141df4962f03" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.7-sec.73D-ssec.8-def.ratenotice" guid="_74c862f7-d433-48b8-928b-30ece2eeb518" type="definition">rate notice</defterm>—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.7-sec.73D-ssec.8-def.ratenotice-para1.a" guid="_aa2d21f1-a0fc-47b6-ad23-8f273fc0ef44" provision.type="other"><no>(a)</no><block><txt break.before="0">for the City of Brisbane—see the <legref jurisd="QLD" type="subordleg" check="valid" target.doc.id="sl-2012-0235" target.version.series="41e6cc2a-7f19-4b16-947b-f28da505add0"><name emphasis="yes">City of Brisbane Regulation 2012</name></legref>, schedule 4; or</txt></block></li><li id="sec.6-frag-ch.3-pt.7-sec.73D-ssec.8-def.ratenotice-para1.b" guid="_5dff5b27-4065-40f1-bc13-6fd75427f024" provision.type="other"><no>(b)</no><block><txt break.before="0">for any other local government—see the <legref jurisd="QLD" type="subordleg" check="valid" target.doc.id="sl-2012-0236" target.version.series="41ff2415-c581-4d17-9646-f6d233ddf461"><name emphasis="yes">Local Government Regulation 2012</name></legref>, schedule 8.</txt></block></li></list></definition><definition id="sec.6-frag-ch.3-pt.7-sec.73D-ssec.8-def.ratepayer_" guid="_2f063dd1-f771-409f-9040-b262f0dfbc6e" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.6-frag-ch.3-pt.7-sec.73D-ssec.8-def.ratepayer" guid="_9a48d9df-10e1-48ee-99c6-9ec54e2799c6" type="definition">ratepayer</defterm>, for a rate notice, means the entity given the notice.</txt></definition></deflist></block></subclause></clause><clause id="sec.6-frag-ch.3-pt.7-sec.73E" guid="_ec72ffc3-a3f3-49ce-9a5c-d2fdf81d7781" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>73E</no><heading id="sec.6-frag-ch.3-pt.7-sec.73E-he" guid="_20c194e4-ddf8-4cbc-9ea4-6c116a49d0b6">Review of efficacy of waste levy</heading><block><txt break.before="1">The chief executive must review the efficacy of the waste levy—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.6-frag-ch.3-pt.7-sec.73E-para1.a" guid="_72f564ec-e944-456a-b31d-014dee8e8e24" provision.type="other"><no>(a)</no><block><txt break.before="0">within 3 years after the commencement; and</txt></block></li><li id="sec.6-frag-ch.3-pt.7-sec.73E-para1.b" guid="_fca502c9-7f96-4180-a9f3-b228d4728efe" provision.type="other"><no>(b)</no><block><txt break.before="0">at intervals of not more than 10 years from 1 review to the next.</txt></block></li></list></block></clause></part></chapter></fragment></block></clause><clause id="sec.7" guid="_99d7f47b-2560-42dc-9213-4f665da33519" affected.by.uncommenced="0" spent.amends="0" provision.type="amend"><no>7</no><heading id="sec.7-he" guid="_d9e9bfca-58a8-4504-bd54-1523a09036e2">Amendment of <legref target.doc.id="act-2011-031" refid="sec.104" target.guid="_428f4a48-281f-4088-8124-b981fb6fd86a" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">s&#160;104</legref> (Illegal dumping of waste provision)</heading><block><txt break.before="1"><legref target.doc.id="act-2011-031" refid="sec.104" target.guid="_428f4a48-281f-4088-8124-b981fb6fd86a" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">Section&#160;104</legref><legref target.doc.id="act-2011-031" refid="sec.104-ssec.1" target.guid="_d4b52884-8745-4059-bece-7159bd221cc0" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">(1)</legref>, penalty—</txt><txt break.before="1"><i>omit, insert—</i></txt><fragment format="fromcontext" auto.number.type="manual" style="indent"><penalty id="sec.7-frag-pen" guid="_eeb9f594-c5a6-4a2e-9f00-30da90492fd7"><block><txt break.before="1">Maximum penalty—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.7-frag-pen-para1.a" guid="_3ca62ba4-ce92-4891-8992-76d9ab682a82" provision.type="other"><no>(a)</no><block><txt break.before="0">if the offence involves depositing a volume of less than 2,500L of waste—400 penalty units; or</txt></block></li><li id="sec.7-frag-pen-para1.b" guid="_a211f178-4e38-4faf-998f-5c525259ee73" provision.type="other"><no>(b)</no><block><txt break.before="0">if the offence involves depositing a volume of 2,500L or more of waste—whichever is the greater of the following amounts—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.7-frag-pen-para1.b-para2.i" guid="_19088bd3-107e-4283-8631-f0f72c20f529" provision.type="other"><no>(i)</no><block><txt break.before="0">1,000 penalty units;</txt></block></li><li id="sec.7-frag-pen-para1.b-para2.ii" guid="_c836c5a7-d248-4ab8-920a-f7973551389e" provision.type="other"><no>(ii)</no><block><txt break.before="0">a fine that is twice the waste levy amount that would have been payable, when the waste was dumped, by the operator of a levyable waste disposal site if the waste had been delivered to the site.</txt></block></li></list></block></li></list></block></penalty></fragment></block></clause><clause id="sec.8" guid="_84b35e46-a8bc-4cd7-8982-121ec1e7dafd" affected.by.uncommenced="0" spent.amends="0" provision.type="amend"><no>8</no><heading id="sec.8-he" guid="_fe2393da-90c0-4c58-a9ea-43f96e53adde">Amendment of ch 7, hdg (Reporting about waste management)</heading><block><txt break.before="1"><legref target.doc.id="act-2011-031" refid="ch.7" target.guid="_4e86683b-f157-496c-9291-5e24d74fcc71" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">Chapter&#160;7</legref>, heading, after ‘management’—</txt><txt break.before="1"><i>insert—</i></txt><fragment format="fromcontext" auto.number.type="manual" style="indent"><block><txt break.before="1"> <b>and waste disposal and recycling</b></txt></block></fragment></block></clause><clause id="sec.9" guid="_2b2689f8-0323-47c9-bbdc-3fd174234396" affected.by.uncommenced="0" spent.amends="0" provision.type="amend"><no>9</no><heading id="sec.9-he" guid="_a180da6e-3ac4-480f-93d0-2250bf211246">Replacement of <legref target.doc.id="act-2011-031" refid="ch.7" target.guid="_4e86683b-f157-496c-9291-5e24d74fcc71" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">ch&#160;7</legref>, <legref target.doc.id="act-2011-031" refid="ch.7-pt.3" target.guid="_97cef636-231d-49e3-95a5-b0f5f7b43555" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">pt&#160;3</legref> (Reporting by chief executive)</heading><block><txt break.before="1"><legref target.doc.id="act-2011-031" refid="ch.7" target.guid="_4e86683b-f157-496c-9291-5e24d74fcc71" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">Chapter&#160;7</legref>, <legref target.doc.id="act-2011-031" refid="ch.7-pt.3" target.guid="_97cef636-231d-49e3-95a5-b0f5f7b43555" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">part&#160;3</legref>—</txt><txt break.before="1"><i>omit, insert—</i></txt><fragment format="fromcontext" auto.number.type="manual" style="indent"><part id="sec.9-frag-pt.3" guid="_429a143d-1ef4-4553-b476-7b0a9cfce6db" affected.by.uncommenced="0"><no>Part 3</no><heading id="sec.9-frag-pt.3-he" guid="_80d923a9-6a8a-48a0-b6e2-bae544735812">Reporting on waste disposal and recycling</heading><clause id="sec.9-frag-pt.3-sec.154" guid="_a712c811-33f6-41e5-9139-16a574d9b3bb" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>154</no><heading id="sec.9-frag-pt.3-sec.154-he" guid="_21e06ecf-a306-413c-97bf-9d735380ab52">Annual report on waste disposal and recycling</heading><subclause id="sec.9-frag-pt.3-sec.154-ssec.1" guid="_e9b7032f-4935-49ac-82d0-8c8b12c2170b" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must, by 31 December in each year, prepare and make publicly available a report that summarises the amounts of waste and recycling reported in the most recently completed financial year.</txt></block></subclause><subclause id="sec.9-frag-pt.3-sec.154-ssec.2" guid="_121d1cab-6953-48bb-87d7-77f3514597a2" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">In preparing the report, the chief executive must have regard to information given to the chief executive under parts 1 and 2 and chapter 3, part 5.</txt></block></subclause><subclause id="sec.9-frag-pt.3-sec.154-ssec.3" guid="_600ca5d1-33b6-432e-9fbf-0953654c4a6f" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The report must include the following information and, if appropriate, an evaluation of the information—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.9-frag-pt.3-sec.154-ssec.3-para1.a" guid="_b5e868fb-9683-4827-897a-e7d1233c592f" provision.type="other"><no>(a)</no><block><txt break.before="0">the total amount of the waste levy paid to the State; </txt></block></li><li id="sec.9-frag-pt.3-sec.154-ssec.3-para1.b" guid="_e4449f87-a6b4-4d70-89ac-569ef8dbfe59" provision.type="other"><no>(b)</no><block><txt break.before="0">the amount and types of waste on which the waste levy was paid to the State; </txt></block></li><li id="sec.9-frag-pt.3-sec.154-ssec.3-para1.c" guid="_d611ee90-48ae-419c-aaba-7b949aae1b2c" provision.type="other"><no>(c)</no><block><txt break.before="0">the amounts and types of waste on which the waste levy would have been paid if it were not exempt waste; </txt></block></li><li id="sec.9-frag-pt.3-sec.154-ssec.3-para1.d" guid="_5ce41bec-412f-4f34-b6b1-4f51e16153e0" provision.type="other"><no>(d)</no><block><txt break.before="0">the number of levyable waste disposal sites in the waste levy zone and non-levy zone that received waste on which the waste levy was paid to the State;</txt></block></li><li id="sec.9-frag-pt.3-sec.154-ssec.3-para1.e" guid="_fd9b1c56-87b5-4468-816e-7de16095428b" provision.type="other"><no>(e)</no><block><txt break.before="0">the amounts of annual payments made to local governments under section 73D;</txt></block></li><li id="sec.9-frag-pt.3-sec.154-ssec.3-para1.f" guid="_edd29a9f-5353-457f-8dd1-23223182389e" provision.type="other"><no>(f)</no><block><txt break.before="0">the amounts and types of waste reported as being recycled by local governments;</txt></block></li><li id="sec.9-frag-pt.3-sec.154-ssec.3-para1.g" guid="_75b72ab2-1b76-4b1c-90dc-ea5f3e2bd275" provision.type="other"><no>(g)</no><block><txt break.before="0">the amounts and types of waste reported as being recycled by reporting entities;</txt></block></li><li id="sec.9-frag-pt.3-sec.154-ssec.3-para1.h" guid="_2c0b5a6f-be20-4814-8fb7-53d7c7e93785" provision.type="other"><no>(h)</no><block><txt break.before="0">the amounts and types of waste reported as being disposed of by local governments;</txt></block></li><li id="sec.9-frag-pt.3-sec.154-ssec.3-para1.i" guid="_cfb9c4f5-2f3e-46e8-9076-8000e1a921d7" provision.type="other"><no>(i)</no><block><txt break.before="0">the amounts and types of waste reported as being disposed of by reporting entities;</txt></block></li><li id="sec.9-frag-pt.3-sec.154-ssec.3-para1.j" guid="_8b9b5836-2854-419c-8c0b-115cd218e742" provision.type="other"><no>(j)</no><block><txt break.before="0">the amounts and types of waste reported as being the subject of littering or illegal dumping;</txt></block></li><li id="sec.9-frag-pt.3-sec.154-ssec.3-para1.k" guid="_73af305c-e8f7-4acc-900a-65af900ef557" provision.type="other"><no>(k)</no><block><txt break.before="0">the number of product stewardship schemes in effect under this Act;</txt></block></li><li id="sec.9-frag-pt.3-sec.154-ssec.3-para1.l" guid="_ec519f75-d74f-4e3f-afc8-4ed21f22cdf5" provision.type="other"><no>(l)</no><block><txt break.before="0">the number of local governments that have adopted a waste reduction and recycling plan and have reported on the plan;</txt></block></li><li id="sec.9-frag-pt.3-sec.154-ssec.3-para1.m" guid="_4780f82b-c696-4e94-ac1b-15a93bcedca0" provision.type="other"><no>(m)</no><block><txt break.before="0">the number of State entities that have adopted a waste reduction and recycling plan and have reported on the plan;</txt></block></li><li id="sec.9-frag-pt.3-sec.154-ssec.3-para1.n" guid="_65ae6d7d-f8f9-43e4-b14d-2310d3f35315" provision.type="other"><no>(n)</no><block><txt break.before="0">the number of planning entities that have adopted waste reduction and recycling plans, other than by adopting the waste reduction and recycling plan of a sector of reporting entities;</txt></block></li><li id="sec.9-frag-pt.3-sec.154-ssec.3-para1.o" guid="_e9c9f843-c8fa-434f-b462-9a831a0e1ea7" provision.type="other"><no>(o)</no><block><txt break.before="0">the number of waste reduction and recycling plans that are in place for sectors of reporting entities.</txt></block></li></list></block></subclause></clause></part></fragment></block></clause><clause id="sec.9A" guid="_c6cebf40-3596-4eb2-8e77-2b279f8a043d" affected.by.uncommenced="0" spent.amends="0" provision.type="amend"><no>9A</no><heading id="sec.9A-he" guid="_7466ecaf-9f63-4cbd-ab47-2527866892f5">Amendment of <legref target.doc.id="act-2011-031" refid="sec.204" target.guid="_b9fe0eb7-d6f8-44d5-a902-d1361707f25a" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">s&#160;204</legref> (Power to enter)</heading><block><txt break.before="1"><legref target.doc.id="act-2011-031" refid="sec.204" target.guid="_b9fe0eb7-d6f8-44d5-a902-d1361707f25a" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">Section&#160;204</legref><legref target.doc.id="act-2011-031" refid="sec.204-ssec.1" target.guid="_9dbdabd4-6287-4f24-b080-a8b787158527" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">(1)</legref>, ‘<legref target.doc.id="act-2011-031" refid="sec.41" target.guid="_bb7fb1b2-98d6-4175-b5c4-3bdc5669a2bf" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">section&#160;41</legref><legref target.doc.id="act-2011-031" refid="sec.41-ssec.1" type="act" check="invalid" jurisd="QLD">(1)</legref>’—</txt><txt break.before="1"><i>omit, insert—</i></txt><fragment format="fromcontext" auto.number.type="manual" style="indent"><block><txt break.before="1">section 53(2)</txt></block></fragment></block></clause><clause id="sec.9B" guid="_cd4ac885-a0fc-4db5-9eb6-ff5440786971" affected.by.uncommenced="0" spent.amends="0" provision.type="amend"><no>9B</no><heading id="sec.9B-he" guid="_5e160719-91fd-46b4-9e47-a01d59647a67">Amendment of <legref target.doc.id="act-2011-031" refid="sec.206" target.guid="_c6538b06-daad-4fcc-a883-d4f9c1607a00" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">s&#160;206</legref> (Application of <legref target.doc.id="act-2011-031" refid="sec.9B-div.1" type="act" check="invalid" jurisd="QLD">div&#160;1</legref>)</heading><block><txt break.before="1"><legref target.doc.id="act-2011-031" refid="sec.206" target.guid="_c6538b06-daad-4fcc-a883-d4f9c1607a00" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">Section&#160;206</legref>, ‘<legref target.doc.id="act-2011-031" refid="sec.41" target.guid="_bb7fb1b2-98d6-4175-b5c4-3bdc5669a2bf" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">section&#160;41</legref><legref target.doc.id="act-2011-031" refid="sec.41-ssec.1" type="act" check="invalid" jurisd="QLD">(1)</legref>’—</txt><txt break.before="1"><i>omit, insert—</i></txt><fragment format="fromcontext" auto.number.type="manual" style="indent"><block><txt break.before="1">section 53(2)</txt></block></fragment></block></clause><clause id="sec.10" guid="_598026f0-da4d-4132-aa54-ce7593edcb8e" affected.by.uncommenced="0" spent.amends="0" provision.type="amend"><no>10</no><heading id="sec.10-he" guid="_c929c309-c09f-4025-b654-ec7bc4338d0f">Amendment of <legref target.doc.id="act-2011-031" refid="sec.245" target.guid="_6aa8e51c-3b29-4452-b45a-4568902296cc" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">s&#160;245</legref> (Definitions for chapter)</heading><block><txt break.before="1"><legref target.doc.id="act-2011-031" refid="sec.245" target.guid="_6aa8e51c-3b29-4452-b45a-4568902296cc" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">Section&#160;245</legref>, <legref target.doc.id="act-2011-031" refid="sec.245-def.prescribedprovision" target.guid="_26385d97-0410-414f-8036-581e86cc5d22" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">definition <defterm type="mention">prescribed provision</defterm></legref>, <legref target.doc.id="act-2011-031" refid="sec.10-para1.a" type="act" check="invalid" jurisd="QLD">paragraph&#160;(a)</legref>, ‘43(2), 44(2), 52(2)’—</txt><txt break.before="1"><i>omit, insert—</i></txt><fragment format="fromcontext" auto.number.type="manual" style="indent"><block><txt break.before="1">38, 53(2), 54(2), 57(2) or (3), 58(2), 60(2), (4) or (6), 61(2) or (3), 63(4), 64(2), 66(2), 67(1), 68(2), 69(2), 72(1), 72A, 72X, 72Y(2), 72Z(2), 73A(2)</txt></block></fragment></block></clause><clause id="sec.11" guid="_03bcaf26-a763-4b98-a794-6fdcc33943e9" affected.by.uncommenced="0" spent.amends="0" provision.type="amend"><no>11</no><heading id="sec.11-he" guid="_9fd91e2a-0f3c-40c2-b836-e937ae320d29">Amendment of <legref target.doc.id="act-2011-031" refid="sec.249" target.guid="_f5445f6f-3845-4ce3-993a-7f85f065cf9f" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">s&#160;249</legref> (Restriction on giving compliance notice)</heading><block><txt break.before="1"><legref target.doc.id="act-2011-031" refid="sec.249" target.guid="_f5445f6f-3845-4ce3-993a-7f85f065cf9f" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">Section&#160;249</legref><legref target.doc.id="act-2011-031" refid="sec.249-ssec.3" target.guid="_59e260fc-78a0-4410-aebb-f1f99c7591f2" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">(3)</legref> and <legref target.doc.id="act-2011-031" refid="sec.249-ssec.4" target.guid="_fc8ec319-2e36-4958-91d7-afbb76e52bef" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">(4)</legref>, ‘<legref target.doc.id="act-2011-031" refid="sec.43" target.guid="_bfa1d6c1-7fee-4e60-b102-c268757978d3" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">section&#160;43</legref><legref target.doc.id="act-2011-031" refid="sec.43-ssec.2" target.guid="_cf0a5ddf-00a6-4726-a880-12c6c4cacfda" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">(2)</legref>’—</txt><txt break.before="1"><i>omit, insert—</i></txt><fragment format="fromcontext" auto.number.type="manual" style="indent"><block><txt break.before="1">section 57(2) or (3)</txt></block></fragment></block></clause><clause id="sec.12" guid="_84faaa56-e185-426c-bb58-f93f523face9" affected.by.uncommenced="0" spent.amends="0" provision.type="amend"><no>12</no><heading id="sec.12-he" guid="_3c60eec9-9fae-46b7-bcc8-9d6c43928a28">Amendment of <legref target.doc.id="act-2011-031" refid="sec.251" target.guid="_b010bccb-fa7b-4317-b9c2-c1cc3f02d908" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">s&#160;251</legref> (Person must comply with notice)</heading><block><txt break.before="1"><legref target.doc.id="act-2011-031" refid="sec.251" target.guid="_b010bccb-fa7b-4317-b9c2-c1cc3f02d908" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">Section&#160;251</legref>, penalty, <legref target.doc.id="act-2011-031" refid="sec.12-para1.b" type="act" check="invalid" jurisd="QLD">paragraph&#160;(b)</legref>, ‘<legref target.doc.id="act-2011-031" refid="sec.43" target.guid="_bfa1d6c1-7fee-4e60-b102-c268757978d3" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">section&#160;43</legref><legref target.doc.id="act-2011-031" refid="sec.43-ssec.3" target.guid="_7149a9ba-2c6b-4a1c-9659-dafc5b778550" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">(3)</legref> or <legref target.doc.id="act-2011-031" refid="sec.43-ssec.4" target.guid="_5fa4f797-5cc2-41a3-9550-7ed031b6fb2c" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">(4)</legref>’—</txt><txt break.before="1"><i>omit, insert—</i></txt><fragment format="fromcontext" auto.number.type="manual" style="indent"><block><txt break.before="1">section 58(2) or (3)</txt></block></fragment></block></clause><clause id="sec.13" guid="_7aa35c6a-631e-4d65-8886-df03604db7f9" affected.by.uncommenced="0" spent.amends="0" provision.type="amend"><no>13</no><heading id="sec.13-he" guid="_9102cd44-174e-42cd-8bfd-7b5654886e82">Amendment of <legref target.doc.id="act-2011-031" refid="sec.253" target.guid="_6797fa0e-a2c4-4bb5-b2f2-ff8946650ac4" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">s&#160;253</legref> (When waste audit required)</heading><block><txt break.before="1"><legref target.doc.id="act-2011-031" refid="sec.253" target.guid="_6797fa0e-a2c4-4bb5-b2f2-ff8946650ac4" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">Section&#160;253</legref><legref target.doc.id="act-2011-031" refid="sec.253-ssec.4" target.guid="_e70b6bf9-28be-442f-89cf-2f2992a0a6a5" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">(4)</legref>, definition <defterm id="sec-def.prescribedprovision-oc.2" guid="_7acef2ee-492d-4cb7-ae1b-afab80d3488c" type="mention">prescribed provision</defterm>, ‘43(2), 44(3), 52(1),’—</txt><txt break.before="1"><i>omit, insert—</i></txt><fragment format="fromcontext" auto.number.type="manual" style="indent"><block><txt break.before="1">56(2), 57(2) or (3), 58(2), 60(2), (4) or (6), 61(2) or (3), 67(1), 68(2), 69(2), 72(1), 72A, 72X, 72Y(2), 72Z(2), 73A(2), 73B(1) or (2),</txt></block></fragment></block></clause><clause id="sec.14" guid="_77980e18-488c-4411-981f-33222e4874b9" affected.by.uncommenced="0" spent.amends="0" provision.type="amend"><no>14</no><heading id="sec.14-he" guid="_eb8359cb-6544-4f54-964a-a1c6cd39b71f">Insertion of new ch 12A</heading><block><txt break.before="1">After <legref target.doc.id="act-2011-031" refid="sec.257" target.guid="_d3f1ed4c-9084-4bd0-9614-777a7e1fe7ac" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">section&#160;257</legref>—</txt><txt break.before="1"><i>insert—</i></txt><fragment format="fromcontext" auto.number.type="manual" style="indent"><chapter id="sec.14-frag-ch.12A" guid="_f4a5d2c7-61c1-41be-86e3-eba98e39d3f3" affected.by.uncommenced="0"><no>Chapter 12A </no><heading id="sec.14-frag-ch.12A-he" guid="_9fb06599-31a3-4090-aa9e-8964d714dd2c">Legal proceedings</heading><clause id="sec.14-frag-ch.12A-sec.257A" guid="_cfda03c0-260e-42f1-a654-ffc11f337da0" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>257A </no><heading id="sec.14-frag-ch.12A-sec.257A-he" guid="_461d80b9-73b1-4d93-b16d-374b32768630">Application of chapter</heading><block><txt break.before="1">This chapter applies to a legal proceeding under this Act.</txt></block></clause><clause id="sec.14-frag-ch.12A-sec.257B" guid="_f3a6e7bf-a2b9-42f6-aa5b-c606ea393170" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>257B </no><heading id="sec.14-frag-ch.12A-sec.257B-he" guid="_9d548a79-82b5-463b-9b49-34b8ee80914a">Appointments and authority</heading><block><txt break.before="1">The following must be presumed unless a party to the proceeding, by reasonable notice, requires proof of it—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.14-frag-ch.12A-sec.257B-para1.a" guid="_3fe93d02-6393-4434-be30-094dfb01231f" provision.type="other"><no>(a)</no><block><txt break.before="0">the chief executive’s appointment;</txt></block></li></list><list number.type="manual" unnumbered.indent="0"><li id="sec.14-frag-ch.12A-sec.257B-para1.b" guid="_736a40f2-f950-4de2-9c58-367a81192278" provision.type="other"><no>(b)</no><block><txt break.before="0">an authorised person’s appointment.</txt></block></li></list></block></clause><clause id="sec.14-frag-ch.12A-sec.257C" guid="_bbae3d89-404f-4a5d-84d5-7faf4a2a9dde" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>257C </no><heading id="sec.14-frag-ch.12A-sec.257C-he" guid="_46a96d34-d217-474c-9639-ceba906a3261">Signatures</heading><block><txt break.before="1">A signature purporting to be the signature of the following person is evidence of the signature it purports to be—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.14-frag-ch.12A-sec.257C-para1.a" guid="_3792e605-1983-4c81-9bc7-4c815decafc5" provision.type="other"><no>(a)</no><block><txt break.before="0">the chief executive;</txt></block></li></list><list number.type="manual" unnumbered.indent="0"><li id="sec.14-frag-ch.12A-sec.257C-para1.b" guid="_79bc5386-c156-4106-83c5-a6969a8f084f" provision.type="other"><no>(b)</no><block><txt break.before="0">an authorised person.</txt></block></li></list></block></clause><clause id="sec.14-frag-ch.12A-sec.257D" guid="_4a21886c-88da-43bf-8558-f7756b80e4db" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>257D </no><heading id="sec.14-frag-ch.12A-sec.257D-he" guid="_4041ed6f-f13b-46f5-9820-275243e34b35">Evidentiary provisions</heading><subclause id="sec.14-frag-ch.12A-sec.257D-ssec.1" guid="_ae05b4ae-4c03-407f-bbf4-5b4cdd8d5434" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">A certificate purporting to be signed by the chief executive and stating any of the following matters is evidence of the matter—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.14-frag-ch.12A-sec.257D-ssec.1-para1.a" guid="_82040d6a-8b5b-433e-82be-6b93807123f7" provision.type="other"><no>(a)</no><block><txt break.before="0">on a stated day a stated waste levy amount was payable by a stated person;</txt></block></li><li id="sec.14-frag-ch.12A-sec.257D-ssec.1-para1.b" guid="_24a62aef-483e-4a2e-92f8-b3feb4a9413e" provision.type="other"><no>(b)</no><block><txt break.before="0">on a stated day a stated person was given a stated notice or direction under this Act;</txt></block></li><li id="sec.14-frag-ch.12A-sec.257D-ssec.1-para1.c" guid="_baafe366-92dc-41a4-ac8d-1e4519b14ad1" provision.type="other"><no>(c)</no><block><txt break.before="0">a stated amount that is or was payable under this Act by a stated person had or had not been paid by the person on a stated day;</txt></block></li><li id="sec.14-frag-ch.12A-sec.257D-ssec.1-para1.d" guid="_13a3d703-438b-4a9a-9b35-06c274641c22" provision.type="other"><no>(d)</no><block><txt break.before="0">a stated document is a copy of a document issued, given, received or kept by the chief executive under this Act;</txt></block></li><li id="sec.14-frag-ch.12A-sec.257D-ssec.1-para1.e" guid="_037c6871-4402-4e29-90c8-e7d388f8be39" provision.type="other"><no>(e)</no><block><txt break.before="0">on a stated day, or during a stated period, a stated person was or was not the holder of an approval, agreement, extension or other authority given under this Act;</txt></block></li><li id="sec.14-frag-ch.12A-sec.257D-ssec.1-para1.f" guid="_16b966d1-e2fd-463d-ba3b-62442556785a" provision.type="other"><no>(f)</no><block><txt break.before="0">on a stated day, or during a stated period, a stated person was or was not the holder of an environmental approval or other authority given under the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261"><name emphasis="no">Environmental Protection Act</name></legref>;</txt></block></li><li id="sec.14-frag-ch.12A-sec.257D-ssec.1-para1.g" guid="_b6d4a521-a463-496a-ba84-1cca07ff1845" provision.type="other"><no>(g)</no><block><txt break.before="0">an approval, agreement, extension or other authority given under this Act or an environmental approval or other authority given under the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261"><name emphasis="no">Environmental Protection Act</name></legref>—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.14-frag-ch.12A-sec.257D-ssec.1-para1.g-para2.i" guid="_59a4fc8a-7d50-49f3-87d4-6ccfb2d160cc" provision.type="other"><no>(i)</no><block><txt break.before="0">was or was not issued or given for a stated term; or</txt></block></li><li id="sec.14-frag-ch.12A-sec.257D-ssec.1-para1.g-para2.ii" guid="_f794d48f-15f9-42ec-a177-7accfbc9531a" provision.type="other"><no>(ii)</no><block><txt break.before="0">was or was not in force on a stated day or during a stated period; or</txt></block></li><li id="sec.14-frag-ch.12A-sec.257D-ssec.1-para1.g-para2.iii" guid="_d76d2b90-175e-4548-b009-808b40faddf8" provision.type="other"><no>(iii)</no><block><txt break.before="0">was or was not subject to a stated condition; </txt></block></li></list></block></li><li id="sec.14-frag-ch.12A-sec.257D-ssec.1-para1.h" guid="_e2642755-7660-4ce9-8868-7838467730a7" provision.type="other"><no>(h)</no><block><txt break.before="0">the reasonable costs incurred by the chief executive in investigating and prosecuting an offence.</txt></block></li></list></block></subclause><subclause id="sec.14-frag-ch.12A-sec.257D-ssec.2" guid="_1bdafb9b-1074-4c52-942e-6762c2428327" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">In a proceeding for an offence against this Act, the production by the prosecutor of a certificate purporting to be signed by an appropriately qualified person (the <defterm id="sec.14-frag-ch.12A-sec.257D-def.analyst" guid="_fb955174-b079-4943-9d5b-72f8025c7f01" type="definition">analyst</defterm>) and stating any of the following matters is evidence of the matter stated in the certificate—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.14-frag-ch.12A-sec.257D-ssec.2-para1.a" guid="_fdb2dff9-e0da-41c0-b415-9b914b368a2e" provision.type="other"><no>(a)</no><block><txt break.before="0">the analyst received from a stated person the sample mentioned in the certificate;</txt></block></li><li id="sec.14-frag-ch.12A-sec.257D-ssec.2-para1.b" guid="_cf7e9a81-6970-4302-8ff2-1a633ad61831" provision.type="other"><no>(b)</no><block><txt break.before="0">the analyst analysed the sample on a stated day and at a stated place;</txt></block></li><li id="sec.14-frag-ch.12A-sec.257D-ssec.2-para1.c" guid="_f976243a-3ee7-4556-9ccb-028d344ef92e" provision.type="other"><no>(c)</no><block><txt break.before="0">the results of the analysis.</txt></block></li></list></block></subclause></clause></chapter></fragment></block></clause><clause id="sec.15" guid="_9d42814b-ac80-43ec-88d3-bac0075400ca" affected.by.uncommenced="0" spent.amends="0" provision.type="amend"><no>15</no><heading id="sec.15-he" guid="_e4f31a96-db5e-42f4-812e-76992df7cb7e">Amendment of <legref target.doc.id="act-2011-031" refid="sec.258" target.guid="_e09ac7f1-8c56-40fe-8f0c-28eec4acfdb4" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">s&#160;258</legref> (Court may make particular orders)</heading><block><txt break.before="1"><legref target.doc.id="act-2011-031" refid="sec.258" target.guid="_e09ac7f1-8c56-40fe-8f0c-28eec4acfdb4" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">Section&#160;258</legref><legref target.doc.id="act-2011-031" refid="sec.258-ssec.7" target.guid="_9f3f6850-7534-4888-b718-00cc0673b042" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">(7)</legref>, definition <defterm guid="_1994b183-d452-4d7b-b115-bf0955fad9a4" type="mention">prescribed offence</defterm>—</txt><txt break.before="1"><i>omit, insert—</i></txt><fragment format="fromcontext" auto.number.type="manual" style="indent"><definition id="sec.15-frag-def.prescribedoffence_" guid="_bcf7b98f-6028-4327-970d-076b4c1cce2b" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.15-frag-def.prescribedoffence" guid="_b321f3b6-6d40-4e34-8f19-61e489b99010" type="definition">prescribed offence</defterm> means an offence against section 53(2), 57(2) or (3), 58(2), (3) or (4), 60(2), (4) or (6), 61(2) or (3), 69(2), 72(1), 73A(2), 73B(1) or (2), 101, 104(1), 158(1) or (2), 173K(2), 264(1) or (2), 265(1), 265A(2), 296(1) or 297(1).</txt></definition></fragment></block></clause><clause id="sec.16" guid="_9af41c24-49b5-4520-a9be-c120a9ef321b" affected.by.uncommenced="0" spent.amends="0" provision.type="amend"><no>16</no><heading id="sec.16-he" guid="_0765fa88-bb41-4da2-9cfc-cabf8c893a8f">Amendment of <legref target.doc.id="act-2011-031" refid="sec.264" target.guid="_de5db943-fe3b-4881-9799-4a4a35280c95" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">s&#160;264</legref> (General duties about documents or records)</heading><block><txt break.before="1"><legref target.doc.id="act-2011-031" refid="sec.264" target.guid="_de5db943-fe3b-4881-9799-4a4a35280c95" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">Section&#160;264</legref>—</txt><txt break.before="1"><i>insert—</i></txt><fragment format="fromcontext" auto.number.type="manual" style="indent"><subclause id="sec.16-frag-ssec.3" guid="_586ffd21-fc2b-4268-8cfd-685a14461db9" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">However, if a person contravenes subsection (1) or (2) with the intent to evade payment of the waste levy, the person is liable to a maximum penalty of—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.16-frag-ssec.3-para1.a" guid="_3790b54f-b799-4128-8205-ca28c5589718" provision.type="other"><no>(a)</no><block><txt break.before="0">2 years imprisonment; or</txt></block></li><li id="sec.16-frag-ssec.3-para1.b" guid="_c239024f-ae9b-4fe0-99a8-9f654182b063" provision.type="other"><no>(b)</no><block><txt break.before="0">whichever is the greater of the following amounts—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.16-frag-ssec.3-para1.b-para2.i" guid="_e0981626-3e9a-48fd-9b7e-24efec0ef801" provision.type="other"><no>(i)</no><block><txt break.before="0">2,000 penalty units;</txt></block></li><li id="sec.16-frag-ssec.3-para1.b-para2.ii" guid="_00f6f9dd-abe6-463a-af63-92d4c00a6a66" provision.type="other"><no>(ii)</no><block><txt break.before="0">a fine that is twice the waste levy amount the payment of which the person sought to evade, and twice the amount of any interest payable in relation to the failure to pay the waste levy amount by the due date for its payment.</txt></block></li></list></block></li></list></block></subclause></fragment></block></clause><clause id="sec.17" guid="_a0860d77-1af3-48c1-bad4-1a99d9627b94" affected.by.uncommenced="0" spent.amends="0" provision.type="amend"><no>17</no><heading id="sec.17-he" guid="_a2e39804-d523-4a5a-ba83-3e7c56e230c2">Replacement of <legref target.doc.id="act-2011-031" refid="sec.265" target.guid="_d381d4f8-70e8-4e2a-86c5-fe299d9bd888" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">s&#160;265</legref> (Giving chief executive false or misleading information)</heading><block><txt break.before="1"><legref target.doc.id="act-2011-031" refid="sec.265" target.guid="_d381d4f8-70e8-4e2a-86c5-fe299d9bd888" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">Section&#160;265</legref>—</txt><txt break.before="1"><i>omit, insert—</i></txt><fragment format="fromcontext" auto.number.type="manual" style="indent"><clause id="sec.17-frag-sec.265" guid="_a7af8fb7-1cea-441a-a3cb-cfa41fe999cf" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>265</no><heading id="sec.17-frag-sec.265-he" guid="_4db6690f-02e4-4879-ac3e-4aadfc36d137">Giving chief executive false or misleading information</heading><subclause id="sec.17-frag-sec.265-ssec.1" guid="_d86acd80-8616-48f9-af69-4e7e8ee2c8d9" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">A person must not, in relation to the administration of this Act, give the chief executive information the person knows is false or misleading in a material particular.</txt><penalty id="sec.17-frag-sec.265-ssec.1-pen" guid="_d0f1c1fa-9dd6-4171-9d5e-263d8fb10f2b"><block><txt break.before="1">Maximum penalty—1,665 penalty units.</txt></block></penalty></block></subclause><subclause id="sec.17-frag-sec.265-ssec.2" guid="_c060d262-e01b-4af6-8a71-124ab8eac9cf" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">However, if the person gave the information to the chief executive with the intent to evade payment of the waste levy, the person is liable to a maximum penalty of—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.17-frag-sec.265-ssec.2-para1.a" guid="_6de48f5e-f17a-4354-8051-3af526b115dd" provision.type="other"><no>(a)</no><block><txt break.before="0">2 years imprisonment; or</txt></block></li><li id="sec.17-frag-sec.265-ssec.2-para1.b" guid="_9eb57f01-6549-49ce-b9bb-05c606b7f062" provision.type="other"><no>(b)</no><block><txt break.before="0">whichever is the greater of the following amounts—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.17-frag-sec.265-ssec.2-para1.b-para2.i" guid="_88fddcdb-e8e5-4829-9a76-ee2456e1b672" provision.type="other"><no>(i)</no><block><txt break.before="0">2,000 penalty units;</txt></block></li><li id="sec.17-frag-sec.265-ssec.2-para1.b-para2.ii" guid="_aae6f7d8-8e0d-4a01-a2fe-dfe62e08ba33" provision.type="other"><no>(ii)</no><block><txt break.before="0">a fine that is twice the waste levy amount the payment of which the person sought to evade, and twice the amount of any interest payable in relation to the failure to pay the waste levy amount by the due date for its payment.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.17-frag-sec.265-ssec.3" guid="_48986549-0574-48af-b761-0136d9bace8d" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">Subsection (1) applies to information given in relation to the administration of this Act whether or not the information was given in response to a specific power under this Act.</txt></block></subclause><subclause id="sec.17-frag-sec.265-ssec.4" guid="_a84a3f88-32ae-4fbc-befa-42def0552715" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">Subsection (1) does not apply to a person if the person, when giving information in a document—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.17-frag-sec.265-ssec.4-para1.a" guid="_726ba640-e4d7-428c-b39d-91e111911d0a" provision.type="other"><no>(a)</no><block><txt break.before="0">tells the chief executive, to the best of the person’s ability, how the document is false or misleading; and</txt></block></li><li id="sec.17-frag-sec.265-ssec.4-para1.b" guid="_5e8dc462-1924-400e-a724-c288c5bb3d3f" provision.type="other"><no>(b)</no><block><txt break.before="0">if the person has, or can reasonably obtain, the correct information—gives the correct information.</txt></block></li></list></block></subclause></clause><clause id="sec.17-frag-sec.265A" guid="_66f10975-19c6-4bf9-ae2f-8f0577b92e5f" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>265A </no><heading id="sec.17-frag-sec.265A-he" guid="_c07b8793-f1ff-4de0-825f-eb46683c09af">Giving chief executive incomplete information</heading><subclause id="sec.17-frag-sec.265A-ssec.1" guid="_745477d2-3813-4bdd-9ab8-973ffcf0cf35" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to a person who is required under chapter 3 to give a document to the chief executive.</txt></block></subclause><subclause id="sec.17-frag-sec.265A-ssec.2" guid="_6a1e3bcd-0e7e-4450-aa25-aa6b5a4edcd3" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The person must not give the chief executive a document the person knows, or ought reasonably to know, contains incomplete information in a material particular.</txt><penalty id="sec.17-frag-sec.265A-ssec.2-pen" guid="_14068ead-6547-44be-90db-5d5295ce3dd1"><block><txt break.before="1">Maximum penalty—1,665 penalty units.</txt></block></penalty></block></subclause><subclause id="sec.17-frag-sec.265A-ssec.3" guid="_99b33bf1-52cb-469a-b3a9-ddb3f9d1087e" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">However, if the person gave the document to the chief executive with the intent to evade payment of the waste levy, the person is liable to a maximum penalty of—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.17-frag-sec.265A-ssec.3-para1.a" guid="_a58e94d0-8ea0-4222-bfd7-a3d9a297d647" provision.type="other"><no>(a)</no><block><txt break.before="0">2 years imprisonment; or</txt></block></li><li id="sec.17-frag-sec.265A-ssec.3-para1.b" guid="_feb0dea1-147d-4493-af3a-a1081f2dccfe" provision.type="other"><no>(b)</no><block><txt break.before="0">whichever is the greater of the following amounts—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.17-frag-sec.265A-ssec.3-para1.b-para2.i" guid="_947e4164-0cb4-4be9-b90c-a783b1fbee0c" provision.type="other"><no>(i)</no><block><txt break.before="0">2,000 penalty units;</txt></block></li><li id="sec.17-frag-sec.265A-ssec.3-para1.b-para2.ii" guid="_fde7a37e-02e1-4a64-8c62-7375d0c1271f" provision.type="other"><no>(ii)</no><block><txt break.before="0">a fine that is twice the waste levy amount the payment of which the person sought to evade, and twice the amount of any interest payable in relation to the failure to pay the waste levy amount by the due date for its payment.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.17-frag-sec.265A-ssec.4" guid="_71aec926-0639-4385-8cd7-3956abaaed0c" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">Subsection (2) does not apply to a person if the person, when giving document—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.17-frag-sec.265A-ssec.4-para1.a" guid="_9cb2f7aa-ab00-470a-ba67-8c2957047e33" provision.type="other"><no>(a)</no><block><txt break.before="0">tells the chief executive of the extent to which the document is incomplete; and</txt></block></li><li id="sec.17-frag-sec.265A-ssec.4-para1.b" guid="_4b98ade2-ab48-4400-89bc-7e81abb629b5" provision.type="other"><no>(b)</no><block><txt break.before="0">if the person has, or can reasonably obtain, the complete information—gives the information.</txt></block></li></list></block></subclause><subclause id="sec.17-frag-sec.265A-ssec.5" guid="_b5e50543-f58a-4b7c-9044-9dc2de38ccc8" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">It is enough for a complaint for an offence against subsection (2) to state the person knew, or ought reasonably to have known, the document was incomplete, without specifying whether the person knew it was incomplete or whether the person ought reasonably to have known it was incomplete.</txt></block></subclause></clause></fragment></block></clause><clause id="sec.18" guid="_9a87771b-22b8-4ca1-8028-662bf8688694" affected.by.uncommenced="0" spent.amends="0" provision.type="amend"><no>18</no><heading id="sec.18-he" guid="_404a62c9-a528-4d00-829f-2847a0fc7f9b">Amendment of <legref target.doc.id="act-2011-031" refid="sec.271" target.guid="_110b8e31-80ff-4c15-9d55-26afd5f43319" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">s&#160;271</legref> (Regulation-making power)</heading><subclause id="sec.18-ssec.1" guid="_3c08bc57-c3aa-4cf9-9502-ad66aa8f58bd" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0"><legref target.doc.id="act-2011-031" refid="sec.271" target.guid="_110b8e31-80ff-4c15-9d55-26afd5f43319" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">Section&#160;271</legref><legref target.doc.id="act-2011-031" refid="sec.271-ssec.2" target.guid="_63e8fe25-67e9-45a5-a6e1-77acbc9aa73a" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">(2)</legref>—</txt><txt break.before="1"><i>insert—</i></txt><fragment format="fromcontext" auto.number.type="manual" style="indent"><list number.type="manual" unnumbered.indent="0"><li id="sec.18-ssec.1-frag-para1.f" guid="_0dad2ac2-e6e7-4c06-aaf4-be78704be9d3" provision.type="other"><no>(f)</no><block><txt break.before="0">the recycling efficiency threshold for recycling activities;</txt></block></li><li id="sec.18-ssec.1-frag-para1.g" guid="_97bf3e38-d4db-46a6-8c81-ccd1ab113014" provision.type="other"><no>(g)</no><block><txt break.before="0">the day, prescribed by regulation, by which the chief executive must review the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.18-ssec.1-frag-para1.g-para2.i" guid="_d9cc82bc-14e4-44c9-b407-ce6d7a74d246" provision.type="other"><no>(i)</no><block><txt break.before="0">the discounted rate for the waste levy for residue waste;</txt></block></li><li id="sec.18-ssec.1-frag-para1.g-para2.ii" guid="_502bef69-67d9-4cd9-bf75-11d925dfddd5" provision.type="other"><no>(ii)</no><block><txt break.before="0">the recycling efficiency threshold for recycling activities;</txt></block></li><li id="sec.18-ssec.1-frag-para1.g-para2.iii" guid="_d0900817-e13b-4784-b81c-5f2452d01222" provision.type="other"><no>(iii)</no><block><txt break.before="0">any other matters mentioned in chapter 3, part 4 as being prescribed by regulation.</txt></block></li></list></block></li></list></fragment></block></subclause><subclause id="sec.18-ssec.2" guid="_28f78f8b-10a1-432a-9f66-65170e3e1fae" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0"><legref target.doc.id="act-2011-031" refid="sec.271" target.guid="_110b8e31-80ff-4c15-9d55-26afd5f43319" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">Section&#160;271</legref>—</txt><txt break.before="1"><i>insert—</i></txt><fragment format="fromcontext" auto.number.type="manual" style="indent"><subclause id="sec.18-ssec.2-frag-ssec.4" guid="_b63161ef-0f53-4147-a7e8-825b3ce4bbcc" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">Subject to the <legref jurisd="CTH" type="act" check="invalid"><name emphasis="yes">National Measurement Act 1960</name> (Cwlth)</legref>, a regulation may impose requirements for a weighbridge that are additional to the requirements applying to the weighbridge under another Act or under a law of the Commonwealth.</txt></block></subclause></fragment></block></subclause></clause><clause id="sec.19" guid="_bc7333ad-a00a-41e6-a213-ef2e5e62581f" affected.by.uncommenced="0" spent.amends="0" provision.type="amend"><no>19</no><heading id="sec.19-he" guid="_fef370eb-1bb9-464c-8b93-5ed0115ab755">Insertion of new <legref target.doc.id="act-2011-031" refid="ch.16" target.guid="_542c15e9-1dcd-4dcf-b2de-64676d3964ab" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">ch&#160;16</legref>, <legref target.doc.id="act-2011-031" refid="ch.16-pt.3" type="act" check="invalid" jurisd="QLD">pt&#160;3</legref></heading><block><txt break.before="1"><legref target.doc.id="act-2011-031" refid="ch.16" target.guid="_542c15e9-1dcd-4dcf-b2de-64676d3964ab" type="act" target.version.series="b4274713-14d8-45a2-9948-e7a5aab0a465" check="valid" jurisd="QLD">Chapter&#160;16</legref>—</txt><txt break.before="1"><i>insert—</i></txt><fragment format="fromcontext" auto.number.type="manual" style="indent"><part id="sec.19-frag-pt.3" guid="_6d3749cc-d957-4fa4-92cd-fda62390b2e0" affected.by.uncommenced="0"><no>Part 3</no><heading id="sec.19-frag-pt.3-he" guid="_5dc7d00c-3ce9-437e-a348-d7b3e6672f51">Transitional provisions for Waste Reduction and Recycling (Waste Levy) Amendment Act 2019</heading><division id="sec.19-frag-pt.3-div.1" guid="_a21f8ebc-3919-4bc0-8a13-2f922ff60e95" affected.by.uncommenced="0"><no>Division 1</no><heading id="sec.19-frag-pt.3-div.1-he" guid="_1ed88647-069b-4a45-9974-83bcd68ce167">Exemption from waste levy for particular residue waste during transition period</heading><clause id="sec.19-frag-pt.3-div.1-sec.309" guid="_bae6239d-e23f-47eb-bf31-007ee783727b" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>309</no><heading id="sec.19-frag-pt.3-div.1-sec.309-he" guid="_324e0bf0-d248-4e59-825f-cffeaf308f44">Definitions for division</heading><block><txt break.before="1">In this division—</txt><deflist><definition id="sec.19-frag-pt.3-div.1-sec.309-def.CairnsBedminsterfacility_" guid="_4d6a0a66-37fe-41da-a2d1-757c7333f714" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.19-frag-pt.3-div.1-sec.309-def.CairnsBedminsterfacility" guid="_3f5adb23-8fad-4106-b8a7-af59c638a1a4" type="definition">Cairns Bedminster facility</defterm> means the facility in Cairns for mechanical biological treatment using Bedminster technology to sort non-organic materials from mixed solid waste and compost the remaining organic material through drum composting and maturation.</txt></definition><definition id="sec.19-frag-pt.3-div.1-sec.309-def.constructionanddemolitionwaste_" guid="_f799b1d6-6841-4f85-ada4-16c6fda64498" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.19-frag-pt.3-div.1-sec.309-def.constructionanddemolitionwaste" guid="_61cfbc8e-afe0-4631-92e9-79458db0ae94" type="definition">construction and demolition waste</defterm> means waste generated as a result of carrying out building work within the meaning of the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-1975-011" target.version.series="d9daab5f-059e-488d-ba00-96f36d4a1fe5"><name emphasis="yes">Building Act 1975</name></legref>, section 5.</txt></definition><definition id="sec.19-frag-pt.3-div.1-sec.309-def.materialrecoveryfacility_" guid="_35e3c19a-2b43-4bc9-bff5-f04c7108247b" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.19-frag-pt.3-div.1-sec.309-def.materialrecoveryfacility" guid="_f5112151-e648-418c-bcd0-35640d926d0e" type="definition">material recovery facility</defterm> means a facility for conducting a recycling activity that comprises sorting any waste other than construction and demolition waste, and preparing recyclable waste for marketing to users.</txt></definition><definition id="sec.19-frag-pt.3-div.1-sec.309-def.qualifyingperiod_" guid="_7720e0b3-9dd5-42c7-aa8c-8e71bd6949d5" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.19-frag-pt.3-div.1-sec.309-def.qualifyingperiod" guid="_ceaadc7f-6f2b-4d0e-a954-7a606c4649eb" type="definition">qualifying period</defterm> means the period starting on 1 July 2018 and ending on the commencement.</txt></definition><definition id="sec.19-frag-pt.3-div.1-sec.309-def.transitionperiod_" guid="_c177ad51-1204-4f18-a9c8-a720e454dce0" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.19-frag-pt.3-div.1-sec.309-def.transitionperiod" guid="_70826c11-4f2e-4ed4-b6df-8c753d53493c" type="definition">transition period</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.19-frag-pt.3-div.1-sec.309-def.transitionperiod-para1.a" guid="_c16994d0-c8bb-4e88-840b-406b4b8cb7c0" provision.type="other"><no>(a)</no><block><txt break.before="0">for the Cairns Bedminster facility—the period starting on the commencement and ending on 30 June 2026; or</txt></block></li><li id="sec.19-frag-pt.3-div.1-sec.309-def.transitionperiod-para1.b" guid="_f32bce39-3a35-4ff7-a077-8629816371d0" provision.type="other"><no>(b)</no><block><txt break.before="0">otherwise—the period starting on the commencement and ending on 30 June 2022.</txt></block></li></list></definition><definition id="sec.19-frag-pt.3-div.1-sec.309-def.transitionperiodexemptresiduewasteapplication_" guid="_d3e7f00e-0508-449a-b763-290d6aacd22b" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.19-frag-pt.3-div.1-sec.309-def.transitionperiodexemptresiduewasteapplication" guid="_4abab535-ae36-4cc5-8674-f860252ac196" type="definition">transition period exempt residue waste application</defterm> see section 310(1).</txt></definition></deflist></block></clause><clause id="sec.19-frag-pt.3-div.1-sec.310" guid="_4a91dae5-886f-4306-8669-76b9922d6257" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>310</no><heading id="sec.19-frag-pt.3-div.1-sec.310-he" guid="_25403099-554a-4edc-90af-bf256d8842df">Application for approval of residue waste as exempt waste for transition period</heading><subclause id="sec.19-frag-pt.3-div.1-sec.310-ssec.1" guid="_1f063f96-4d81-45e8-9e22-e19308ee0cdf" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">An entity that conducted a recycling activity during the qualifying period may apply to the chief executive for an approval that residue waste identified in the application (a <defterm id="sec.19-frag-pt.3-div.1-sec.310-def.transitionperiodexemptresiduewasteapplication" guid="_b3512f53-8f2f-4e2d-9299-f0b9a60aa13d" type="definition">transition period exempt residue waste application</defterm>) is exempt waste for the transition period.</txt></block></subclause><subclause id="sec.19-frag-pt.3-div.1-sec.310-ssec.2" guid="_18d2dcfd-3c5b-43eb-9a6e-3668b137e1e0" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">For an application relating to a material recovery facility, the application must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.19-frag-pt.3-div.1-sec.310-ssec.2-para1.a" guid="_08e4998d-254d-40b2-99db-1fea0d72709f" provision.type="other"><no>(a)</no><block><txt break.before="0">be made on or before 30 June 2019; and</txt></block></li><li id="sec.19-frag-pt.3-div.1-sec.310-ssec.2-para1.b" guid="_d0d6667a-a764-4a61-8d49-f8243ac6cf18" provision.type="other"><no>(b)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li id="sec.19-frag-pt.3-div.1-sec.310-ssec.2-para1.c" guid="_96848daa-bd0d-4a57-9539-127a5aac3945" provision.type="other"><no>(c)</no><block><txt break.before="0">be supported by enough information to allow the chief executive to decide the application, including evidence that the applicant conducted a recycling activity during the qualifying period.</txt></block></li></list></block></subclause><subclause id="sec.19-frag-pt.3-div.1-sec.310-ssec.3" guid="_7957a324-e0e5-4753-8846-a120cb4556dc" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">For an application relating to the Cairns Bedminster facility, the application must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.19-frag-pt.3-div.1-sec.310-ssec.3-para1.a" guid="_4938836c-e41c-4dc6-925b-d776fbc872e0" provision.type="other"><no>(a)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li id="sec.19-frag-pt.3-div.1-sec.310-ssec.3-para1.b" guid="_07396aa4-79dd-4e60-bcc4-726375fbd016" provision.type="other"><no>(b)</no><block><txt break.before="0">be supported by enough information to allow the chief executive to decide the application.</txt></block></li></list></block></subclause><subclause id="sec.19-frag-pt.3-div.1-sec.310-ssec.4" guid="_842317e9-51af-4bcf-9045-b9f001d4ee7d" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">For an application not mentioned in subsection (2) or (3), the application must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.19-frag-pt.3-div.1-sec.310-ssec.4-para1.b" guid="_ca775ca0-6289-474e-8f1e-23d5c4c10f65" provision.type="other"><no>(b)</no><block><txt break.before="0">be in the approved form; and</txt></block></li><li id="sec.19-frag-pt.3-div.1-sec.310-ssec.4-para1.c" guid="_b1a7ecfb-013b-4231-9107-d73146f96601" provision.type="other"><no>(c)</no><block><txt break.before="0">be supported by enough information to allow the chief executive to decide the application, including evidence that—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.19-frag-pt.3-div.1-sec.310-ssec.4-para1.c-para2.i" guid="_091c1122-59f6-4168-89a2-6ed7a4dad781" provision.type="other"><no>(i)</no><block><txt break.before="0">the applicant conducted a recycling activity during the qualifying period; and</txt></block></li><li id="sec.19-frag-pt.3-div.1-sec.310-ssec.4-para1.c-para2.ii" guid="_be8759f3-2147-4ca8-8705-5b8fec1ffaa2" provision.type="other"><no>(ii)</no><block><txt break.before="0">	payment of the waste levy on the residue waste from the applicant’s recycling activity would cause the applicant financial hardship to an extent that would stop its business from operating.</txt></block></li></list></block></li></list></block></subclause></clause><clause id="sec.19-frag-pt.3-div.1-sec.311" guid="_8610fe80-c459-4beb-be7a-f78171a4f408" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>311</no><heading id="sec.19-frag-pt.3-div.1-sec.311-he" guid="_370c26c3-637a-4605-9a84-4f709f5ffb33">Chief executive may require additional information or documents</heading><subclause id="sec.19-frag-pt.3-div.1-sec.311-ssec.1" guid="_eedf0796-fd48-4e96-999d-7b982b98d266" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">Within 28 days after receiving a transition period exempt residue waste application, the chief executive may, by notice given to the applicant, require the applicant to give the chief executive further reasonable information or documents about the application by a reasonable day stated in the notice.</txt></block></subclause><subclause id="sec.19-frag-pt.3-div.1-sec.311-ssec.2" guid="_d3e3d98e-5625-4684-8e70-8f93b271dd0d" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The application is taken to be withdrawn if the applicant does not give the chief executive the further information or documents by the stated day.</txt></block></subclause></clause><clause id="sec.19-frag-pt.3-div.1-sec.312" guid="_e87d5f5e-8109-46b0-80bb-ec57c0dd83d2" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>312</no><heading id="sec.19-frag-pt.3-div.1-sec.312-he" guid="_4ad166ae-86b9-4a20-8287-fe16ef5a20c4">Deciding application</heading><subclause id="sec.19-frag-pt.3-div.1-sec.312-ssec.1" guid="_42fab965-cb92-40af-8611-4a9393b0706b" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must decide either to grant or to refuse a transition period exempt residue waste application within a period that is reasonable in the circumstances.</txt></block></subclause><subclause id="sec.19-frag-pt.3-div.1-sec.312-ssec.2" guid="_87b37cfe-d9d9-4429-aa9a-4d4c6d2d768f" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">In deciding the application, the chief executive must consider the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.19-frag-pt.3-div.1-sec.312-ssec.2-para1.a" guid="_f1894adc-babe-48f0-a366-e0d4f6837326" provision.type="other"><no>(a)</no><block><txt break.before="0">the objects of this Act;</txt></block></li><li id="sec.19-frag-pt.3-div.1-sec.312-ssec.2-para1.b" guid="_f3d1882a-82c3-4bbb-9614-b408532d221e" provision.type="other"><no>(b)</no><block><txt break.before="0">the information included in the application;</txt></block></li><li id="sec.19-frag-pt.3-div.1-sec.312-ssec.2-para1.c" guid="_8998565b-71a5-410f-b512-acf0ee0c70f3" provision.type="other"><no>(c)</no><block><txt break.before="0">whether adequate measures will be implemented to progressively minimise the amount of the applicant’s residue waste generation;</txt></block></li><li id="sec.19-frag-pt.3-div.1-sec.312-ssec.2-para1.d" guid="_3ad3dd8d-ebcc-4275-85cf-4974ca4121e0" provision.type="other"><no>(d)</no><block><txt break.before="0">whether adequate measures will be implemented to ensure the applicant will be able to keep conducting the recycling activity after the transition period ends;</txt></block></li><li id="sec.19-frag-pt.3-div.1-sec.312-ssec.2-para1.e" guid="_30cb01a0-f567-45ad-8d20-f72d26d280dc" provision.type="other"><no>(e)</no><block><txt break.before="0">the applicant’s history of compliance with this Act and the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261"><name emphasis="no">Environmental Protection Act</name></legref>, including whether the applicant holds any licences, environmental authorities or other approvals for conducting the recycling activity.</txt></block></li></list></block></subclause><subclause id="sec.19-frag-pt.3-div.1-sec.312-ssec.3" guid="_104b16ba-73ed-4795-b340-ca1256c4ba7b" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">Also, the chief executive may consult with any expert reference group or other entity the chief executive considers suitable to provide advice in relation to financial hardship.</txt></block></subclause><subclause id="sec.19-frag-pt.3-div.1-sec.312-ssec.4" guid="_11f9df70-d53b-4242-a1b0-2396c98faadc" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">The chief executive must not grant the application unless satisfied the applicant conducted a recycling activity during the qualifying period and—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.19-frag-pt.3-div.1-sec.312-ssec.4-para1.a" guid="_cbfa27ea-1d40-47a7-8f43-2031b349f5ba" provision.type="other"><no>(a)</no><block><txt break.before="0">for a material recovery facility—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.19-frag-pt.3-div.1-sec.312-ssec.4-para1.a-para2.i" guid="_5d0ec27c-e07c-4ec7-a372-58deef2ca7a2" provision.type="other"><no>(i)</no><block><txt break.before="0">the applicant’s performance history achieves as a minimum the recycling efficiency threshold; or</txt></block></li><li id="sec.19-frag-pt.3-div.1-sec.312-ssec.4-para1.a-para2.ii" guid="_74e44862-cbc7-45e8-9356-2b0c0f7d04b1" provision.type="other"><no>(ii)</no><block><txt break.before="0">the strategies or practices proposed in the application to progressively improve the efficiency of the applicant’s recycling activity will enable the applicant to achieve as a minimum the recycling efficiency threshold during the period of the exemption; or</txt></block></li></list></block></li><li id="sec.19-frag-pt.3-div.1-sec.312-ssec.4-para1.b" guid="_fa041031-522f-4d84-b132-97bc3d7de498" provision.type="other"><no>(b)</no><block><txt break.before="0">for the Cairns Bedminster facility—the applicant will be able to achieve as a minimum the recycling efficiency threshold; or</txt></block></li><li id="sec.19-frag-pt.3-div.1-sec.312-ssec.4-para1.c" guid="_e891016f-5069-459b-97d4-65fd931dd38f" provision.type="other"><no>(c)</no><block><txt break.before="0">for any other applicant—payment of the waste levy on the residue waste from the recycling activity would cause the applicant financial hardship to an extent that would stop its business from operating.</txt></block></li></list></block></subclause><subclause id="sec.19-frag-pt.3-div.1-sec.312-ssec.5" guid="_4ef5d69e-5d9a-442d-8d52-097fc9d0d0a1" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">However, subsection (4)(a) does not apply for a material recovery facility if the chief executive is satisfied that—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.19-frag-pt.3-div.1-sec.312-ssec.5-para1.a" guid="_165b109c-f813-4cd7-91d4-26e194fc387c" provision.type="other"><no>(a)</no><block><txt break.before="0">it is not reasonably practical for the applicant to achieve as a minimum the recycling efficiency threshold; and</txt></block></li><li id="sec.19-frag-pt.3-div.1-sec.312-ssec.5-para1.b" guid="_d8612c1d-7da8-499b-84b6-1cab45d3b8ea" provision.type="other"><no>(b)</no><block><txt break.before="0">the strategies or practices proposed in the application to progressively improve the efficiency of the applicant’s recycling activity will enable the applicant to achieve a recycling efficiency during the period of the exemption that is as close to the recycling efficiency threshold as is reasonably practical in the circumstances.</txt></block></li></list></block></subclause><subclause id="sec.19-frag-pt.3-div.1-sec.312-ssec.6" guid="_f0c6d8c3-5e8f-4569-be43-ad93bb264b80" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block><txt break.before="0">A failure to make a decision within a period that is reasonable in the circumstances is taken to be a decision by the chief executive to refuse the application.</txt></block></subclause><subclause id="sec.19-frag-pt.3-div.1-sec.312-ssec.7" guid="_35b26206-8a29-48dc-83ef-dd2bd2a61d55" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sec.19-frag-pt.3-div.1-sec.312-ssec.7-def.recyclingefficiencythreshold_" guid="_9845f916-218d-42b8-b8b1-2d621d699015" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.19-frag-pt.3-div.1-sec.312-ssec.7-def.recyclingefficiencythreshold" guid="_73bee669-6494-47ff-94d1-49e17ccf7150" type="definition">recycling efficiency threshold</defterm> means—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.19-frag-pt.3-div.1-sec.312-ssec.7-def.recyclingefficiencythreshold-para1.a" guid="_31bb44f4-2273-463f-af8e-66079ce1e39e" provision.type="other"><no>(a)</no><block><txt break.before="0">for a material recovery facility—85% of the feedstock for a recycling activity is not disposed of as landfill as a result of the activity; or</txt></block></li><li id="sec.19-frag-pt.3-div.1-sec.312-ssec.7-def.recyclingefficiencythreshold-para1.b" guid="_b02130ff-abc6-4c60-a6b1-8a86e33847e5" provision.type="other"><no>(b)</no><block><txt break.before="0">for the Cairns Bedminster facility—33% of the feedstock for a recycling activity is not disposed of as landfill as a result of the activity.</txt></block></li></list></definition></deflist></block></subclause></clause><clause id="sec.19-frag-pt.3-div.1-sec.313" guid="_5f146101-b37d-4e60-ba3f-9886d53c604f" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>313</no><heading id="sec.19-frag-pt.3-div.1-sec.313-he" guid="_89ec9f7a-f587-4dfa-a458-82ead6b86327">Grant of application</heading><subclause id="sec.19-frag-pt.3-div.1-sec.313-ssec.1" guid="_122b3156-9dfa-479e-bf08-4e9faa02f840" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">If the chief executive grants a transition period exempt residue waste application, the chief executive must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.19-frag-pt.3-div.1-sec.313-ssec.1-para1.a" guid="_d871a7d7-604c-4f03-a56a-5a19a2e3dce3" provision.type="other"><no>(a)</no><block><txt break.before="0">in addition to any other conditions, impose a condition on the approval either—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.19-frag-pt.3-div.1-sec.313-ssec.1-para1.a-para2.i" guid="_f2044500-0f6e-4f18-b126-9f33b4aa8682" provision.type="other"><no>(i)</no><block><txt break.before="0">	requiring the applicant maintain as a minimum a stated recycling efficiency; or</txt></block></li><li id="sec.19-frag-pt.3-div.1-sec.313-ssec.1-para1.a-para2.ii" guid="_8c060d6c-70db-4a11-ab3f-2937545e89c0" provision.type="other"><no>(ii)</no><block><txt break.before="0">	limiting the amount of residue waste that will attract the discount rate in a period, including, for example, as a stated proportion of the amount of waste that is used as feedstock for the recycling activity in the period; and</txt></block></li></list></block></li><li id="sec.19-frag-pt.3-div.1-sec.313-ssec.1-para1.b" guid="_2bf95810-cbc3-4e48-bd03-3f3ecd4f5943" provision.type="other"><no>(b)</no><block><txt break.before="0">give the applicant notice of the grant stating the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.19-frag-pt.3-div.1-sec.313-ssec.1-para1.b-para2.i" guid="_c22cc69d-278f-4af6-8bf4-936655811048" provision.type="other"><no>(i)</no><block><txt break.before="0">the application has been granted;</txt></block></li><li id="sec.19-frag-pt.3-div.1-sec.313-ssec.1-para1.b-para2.ii" guid="_aa92b957-e351-4f8e-b219-325f8500eea5" provision.type="other"><no>(ii)</no><block><txt break.before="0">the period for which the residue waste identified in the application is approved to be exempt waste;</txt></block></li><li id="sec.19-frag-pt.3-div.1-sec.313-ssec.1-para1.b-para2.iii" guid="_8beb8202-3169-4264-b42a-1f0e59bfe31f" provision.type="other"><no>(iii)</no><block><txt break.before="0">any conditions imposed on the approval, including any limits on the types and amounts of residue waste that may be disposed of as exempt waste in the period mentioned in subparagraph (ii);</txt></block></li><li id="sec.19-frag-pt.3-div.1-sec.313-ssec.1-para1.b-para2.iv" guid="_f36a687a-3db0-4843-a46a-c7bd52197a85" provision.type="other"><no>(iv)</no><block><txt break.before="0">any conditions prescribed by regulation applying to the approval.</txt></block></li></list></block></li></list></block></subclause><subclause id="sec.19-frag-pt.3-div.1-sec.313-ssec.2" guid="_2e6d4f7d-724a-426e-9547-b165485de506" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">If the application relates to the Cairns Bedminster facility, the period mentioned in subsection (1)(b)(ii) must not be more than 3 years.</txt></block></subclause><subclause id="sec.19-frag-pt.3-div.1-sec.313-ssec.3" guid="_bf85f70e-0854-48c5-8067-085860ddcfa0" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The notice must include or be accompanied by an information notice for the decision to impose a condition unless the condition is the same, or substantially the same, as a condition agreed to or asked for by the applicant.</txt></block></subclause><subclause id="sec.19-frag-pt.3-div.1-sec.313-ssec.4" guid="_1251f602-f369-4e93-9604-9b573a12c10a" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">The approval is subject to any conditions imposed by the chief executive and any conditions prescribed by regulation.</txt></block></subclause><subclause id="sec.19-frag-pt.3-div.1-sec.313-ssec.5" guid="_0904825b-80e7-482b-bdff-3d06d725e113" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sec.19-frag-pt.3-div.1-sec.313-ssec.5-def.recyclingefficiency_" guid="_3bbc6ea2-675d-4885-824a-7832573f4309" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.19-frag-pt.3-div.1-sec.313-ssec.5-def.recyclingefficiency" guid="_8926d398-8fce-4c5b-8748-064087053d87" type="definition">recycling efficiency</defterm> means a percentage of the feedstock for a recycling activity that is not disposed of as landfill as a result of the activity.</txt></definition></deflist></block></subclause></clause><clause id="sec.19-frag-pt.3-div.1-sec.314" guid="_0c0b28c3-6c5e-4e93-a31e-1f8353269f73" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>314</no><heading id="sec.19-frag-pt.3-div.1-sec.314-he" guid="_657c9ac9-fd7f-484c-a354-301795f9b5b7">Refusal of application</heading><block><txt break.before="1">If the chief executive refuses a transition period exempt residue waste application, the chief executive must give the applicant an information notice for the decision.</txt></block></clause><clause id="sec.19-frag-pt.3-div.1-sec.315" guid="_8d59ee37-b3c9-485f-8c11-db86195b728a" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>315</no><heading id="sec.19-frag-pt.3-div.1-sec.315-he" guid="_76b4031f-1757-4335-8b91-26090c878869">Cancellation or amendment of approval by chief executive</heading><subclause id="sec.19-frag-pt.3-div.1-sec.315-ssec.1" guid="_e947adcb-a663-49a8-ab2a-fb6e28d6adbf" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive may cancel or amend an approval that residue waste is exempt waste granted under section 312 if the chief executive considers there are reasonable grounds to cancel or amend it.</txt></block></subclause><subclause id="sec.19-frag-pt.3-div.1-sec.315-ssec.2" guid="_4fb8b912-c488-4095-b7b3-90d25406b9eb" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">Without limiting subsection&#160;(1), the grounds for cancelling or amending the approval may include—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.19-frag-pt.3-div.1-sec.315-ssec.2-para1.a" guid="_272b966f-c9a4-4da5-89bf-b5a7264a5c17" provision.type="other"><no>(a)</no><block><txt break.before="0">that the chief executive is satisfied there is a reasonable suspicion that the approval holder has not implemented strategies or practices to progressively improve the efficiency of the holder’s recycling activities during the period of the approval; and</txt></block></li><li id="sec.19-frag-pt.3-div.1-sec.315-ssec.2-para1.b" guid="_38646afb-50ca-4558-be5f-5a51443ca5fc" provision.type="other"><no>(b)</no><block><txt break.before="0">that the chief executive is satisfied there is a reasonable suspicion that the application was granted because of a false or misleading representation or declaration; and</txt></block></li><li id="sec.19-frag-pt.3-div.1-sec.315-ssec.2-para1.c" guid="_51668126-433d-4455-9223-51708405718a" provision.type="other"><no>(c)</no><block><txt break.before="0">the circumstances that were relevant to the granting of the application have changed; and</txt></block></li><li id="sec.19-frag-pt.3-div.1-sec.315-ssec.2-para1.d" guid="_2356d0aa-df54-4ad7-9775-d079114c59f9" provision.type="other"><no>(d)</no><block><txt break.before="0">that the limits or conditions of the approval have not been complied with; and</txt></block></li><li id="sec.19-frag-pt.3-div.1-sec.315-ssec.2-para1.e" guid="_8c452085-17a3-4447-a523-2d5e6457cba8" provision.type="other"><no>(e)</no><block><txt break.before="0">that it is desirable to cancel the approval having regard to the objects of this <legref jurisd="QLD" type="act" check="invalid">Act</legref>.</txt></block></li></list></block></subclause><subclause id="sec.19-frag-pt.3-div.1-sec.315-ssec.3" guid="_cfc7b53f-01d1-4266-b7ed-a16a6967e56f" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">Before cancelling or amending the approval (the <defterm id="sec.19-frag-pt.3-div.1-sec.315-def.proposedaction" guid="_b6d958d4-568c-4019-b26d-6acd4967c730" type="definition">proposed action</defterm>), the chief executive must give notice to the holder of the approval stating the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.19-frag-pt.3-div.1-sec.315-ssec.3-para1.a" guid="_16947a74-a2ec-4912-9746-40a11a753cf5" provision.type="other"><no>(a)</no><block><txt break.before="0">the proposed action;</txt></block></li><li id="sec.19-frag-pt.3-div.1-sec.315-ssec.3-para1.b" guid="_45f5f4da-d24c-4b14-90c0-2f89db303547" provision.type="other"><no>(b)</no><block><txt break.before="0">the grounds for taking the proposed action;</txt></block></li><li id="sec.19-frag-pt.3-div.1-sec.315-ssec.3-para1.c" guid="_60674e9e-2f6f-4fb5-94a3-0d6781c2e992" provision.type="other"><no>(c)</no><block><txt break.before="0">the facts and circumstances that form the basis for the grounds;</txt></block></li><li id="sec.19-frag-pt.3-div.1-sec.315-ssec.3-para1.d" guid="_a4b1ec38-2eb0-4189-bf64-2ee9198c5120" provision.type="other"><no>(d)</no><block><txt break.before="0">when the proposed action is intended to take effect;</txt></block></li><li id="sec.19-frag-pt.3-div.1-sec.315-ssec.3-para1.e" guid="_ac2c6217-9220-4e70-ab13-0f3cf7bf65c5" provision.type="other"><no>(e)</no><block><txt break.before="0">that the holder may make, within a stated period, written submissions to show why the proposed action should not be taken.</txt></block></li></list></block></subclause><subclause id="sec.19-frag-pt.3-div.1-sec.315-ssec.4" guid="_11024604-fc4a-4182-be4d-ce1f2e3d89e1" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">The stated period for submissions must not end earlier than 21 days after the holder of the approval is given the notice.</txt></block></subclause><subclause id="sec.19-frag-pt.3-div.1-sec.315-ssec.5" guid="_8855a140-0111-4abd-8b4c-48d15bbb9844" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">The chief executive must consider all submissions made under subsection&#160;(3)(e).</txt></block></subclause><subclause id="sec.19-frag-pt.3-div.1-sec.315-ssec.6" guid="_1d624ad3-eeb5-45bd-884f-d7bb4172285a" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block><txt break.before="0">If the chief executive decides to take the proposed action, the chief executive must, within 10 business days after making the decision, give the holder of the approval an information notice for the decision.</txt></block></subclause><subclause id="sec.19-frag-pt.3-div.1-sec.315-ssec.7" guid="_c02ac1a6-0bb8-4043-8712-c0443f77f205" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block><txt break.before="0">The decision takes effect when the information notice is given to the holder of the approval.</txt></block></subclause></clause><clause id="sec.19-frag-pt.3-div.1-sec.316" guid="_126bcd84-7644-4c0f-8e6f-f3e18e21fdb2" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>316</no><heading id="sec.19-frag-pt.3-div.1-sec.316-he" guid="_4e4d48df-72f3-41f2-8869-c8bdb3759b59">Automatic cancellation of approval</heading><block><txt break.before="1">An approval that residue waste is exempt waste, granted under section 312, is automatically cancelled if the business of conducting the recycling activity relevant to the approval ceases to be owned by the entity granted the approval, including, for example, because ownership of the business is transferred to another entity.</txt></block></clause></division><division id="sec.19-frag-pt.3-div.2" guid="_ab4b7522-088d-4a46-a1e2-76a92a504879" affected.by.uncommenced="0"><no>Division 2</no><heading id="sec.19-frag-pt.3-div.2-he" guid="_c67adbc9-2782-4d32-8ff9-39582b119b51">Exemption from weighbridge requirements for particular sites until 30 June 2029</heading><clause id="sec.19-frag-pt.3-div.2-sec.317" guid="_16956e47-477a-4c56-982b-f4441695a0ca" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>317</no><heading id="sec.19-frag-pt.3-div.2-sec.317-he" guid="_b0aef7ee-7332-4772-a6f3-1d10a75677d6">Application for exemption from s 57 until 30 June 2029</heading><subclause id="sec.19-frag-pt.3-div.2-sec.317-ssec.1" guid="_fbf7d830-863d-424a-a7f8-ec9126f8dd2b" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">This section applies to the operator of a levyable waste disposal site in existence at the commencement for which the operator holds an environmental authority for the disposal of not more than 2,000 tonnes of waste in a year at the site.</txt></block></subclause><subclause id="sec.19-frag-pt.3-div.2-sec.317-ssec.2" guid="_c4bb24d6-2476-4f21-bc68-67bc4533f744" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The operator may apply to the chief executive for an exemption during the transition period from the requirements under section 57.</txt></block></subclause><subclause id="sec.19-frag-pt.3-div.2-sec.317-ssec.3" guid="_1cdd51d1-48f0-4363-8053-c66ee0da968c" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The application must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.19-frag-pt.3-div.2-sec.317-ssec.3-para1.a" guid="_0e7653a6-0304-4893-b36f-2d85a3a1e2dc" provision.type="other"><no>(a)</no><block><txt break.before="0">be made before 1 January 2024; and</txt></block></li><li id="sec.19-frag-pt.3-div.2-sec.317-ssec.3-para1.b" guid="_ce7ab3c8-c3eb-4bc7-bcb1-ee9753c0045e" provision.type="other"><no>(b)</no><block><txt break.before="0">be in the approved form.</txt></block></li></list></block></subclause><subclause id="sec.19-frag-pt.3-div.2-sec.317-ssec.4" guid="_bb3d0c91-2f6b-4501-a56f-7ccda280b347" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">In this section—</txt><deflist><definition id="sec.19-frag-pt.3-div.2-sec.317-ssec.4-def.transitionperiod_" guid="_b89b940e-77a8-44cf-a4f4-a5b9caa0d136" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.19-frag-pt.3-div.2-sec.317-ssec.4-def.transitionperiod" guid="_aba8a5db-fd96-49d8-a963-035dd772e970" type="definition">transition period</defterm> means the period starting at the beginning of 1 July 2024 and ending at the end of 30 June 2029.</txt></definition></deflist></block></subclause></clause><clause id="sec.19-frag-pt.3-div.2-sec.318" guid="_fc4ce93b-af23-44d4-beac-c828f577106d" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>318</no><heading id="sec.19-frag-pt.3-div.2-sec.318-he" guid="_93a5b832-ce37-40b2-9eb8-097c25b1350d">Chief executive may require additional information or documents</heading><subclause id="sec.19-frag-pt.3-div.2-sec.318-ssec.1" guid="_cd90dc83-8fc0-472e-b03c-64d315afc3b9" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">Within 28 days after receiving an application made under section 317, the chief executive may, by notice given to the applicant, require the applicant to give the chief executive further reasonable information or documents about the application by a reasonable day stated in the notice.</txt></block></subclause><subclause id="sec.19-frag-pt.3-div.2-sec.318-ssec.2" guid="_085fce89-3821-4779-956a-10a43e405b6c" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The application is taken to be withdrawn if the applicant does not give the chief executive the further information or documents by the stated day.</txt></block></subclause></clause><clause id="sec.19-frag-pt.3-div.2-sec.319" guid="_ddd33257-050a-4d51-af7f-0f219299dcb2" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>319</no><heading id="sec.19-frag-pt.3-div.2-sec.319-he" guid="_f487f9ae-4bf6-4765-bcdd-d59030aaa5cd">Deciding application</heading><subclause id="sec.19-frag-pt.3-div.2-sec.319-ssec.1" guid="_f277a444-1820-4ede-acfe-bddb3fe1931e" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">The chief executive must decide either to grant or to refuse an application made under section 317 within a period that is reasonable in the circumstances.</txt></block></subclause><subclause id="sec.19-frag-pt.3-div.2-sec.319-ssec.2" guid="_b713b5a9-c71e-4543-9728-b946e3efe4d7" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">In deciding the application, the chief executive must consider—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.19-frag-pt.3-div.2-sec.319-ssec.2-para1.a" guid="_d3748f8e-e611-4625-8e13-da54952ada1c" provision.type="other"><no>(a)</no><block><txt break.before="0">the objects of this Act; and</txt></block></li><li id="sec.19-frag-pt.3-div.2-sec.319-ssec.2-para1.b" guid="_9e5171ef-a193-4e7e-a251-b5cf336e51d7" provision.type="other"><no>(b)</no><block><txt break.before="0">the information included in the application.</txt></block></li></list></block></subclause><subclause id="sec.19-frag-pt.3-div.2-sec.319-ssec.3" guid="_02fd82dc-f0eb-494f-8a3a-565f9ed450d8" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">A failure to make a decision within a period that is reasonable in the circumstances is taken to be a decision by the chief executive to refuse the application.</txt></block></subclause></clause><clause id="sec.19-frag-pt.3-div.2-sec.320" guid="_49a1621c-5690-463f-9499-7c461cfc22eb" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>320</no><heading id="sec.19-frag-pt.3-div.2-sec.320-he" guid="_4c0be8d1-0aa8-4ce4-b1cd-12014458e50e">Grant of application</heading><subclause id="sec.19-frag-pt.3-div.2-sec.320-ssec.1" guid="_815accd7-b6dd-49f6-b416-908c31d10a24" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">If the chief executive grants an application made under section 317, the chief executive must give the applicant a notice stating—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.19-frag-pt.3-div.2-sec.320-ssec.1-para1.a" guid="_0c2453c0-a044-4cf1-aef7-ed934e47cf2b" provision.type="other"><no>(a)</no><block><txt break.before="0">the application has been granted; and</txt></block></li><li id="sec.19-frag-pt.3-div.2-sec.320-ssec.1-para1.b" guid="_3117d988-8459-424b-9b7a-7251f6ad479d" provision.type="other"><no>(b)</no><block><txt break.before="0">any conditions imposed on the approval.</txt></block></li></list></block></subclause><subclause id="sec.19-frag-pt.3-div.2-sec.320-ssec.2" guid="_d87f31eb-06bb-4aff-9d4f-ad77cfd056d1" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">Also, if the chief executive imposes a condition on the approval, the notice must include or be accompanied by an information notice for the decision to impose the condition.</txt></block></subclause><subclause id="sec.19-frag-pt.3-div.2-sec.320-ssec.3" guid="_18564ff7-b5dc-493d-ab1e-768f6e5accef" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">However, subsection&#160;(2) does not apply to a condition that is substantially the same as a condition agreed to or asked for by the applicant.</txt></block></subclause></clause><clause id="sec.19-frag-pt.3-div.2-sec.321" guid="_cc85859c-d2db-4bf3-a4e1-9f10bba53f85" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>321</no><heading id="sec.19-frag-pt.3-div.2-sec.321-he" guid="_68f2e78a-cd74-4712-aac5-7d774752ff4e">Refusal of application</heading><block><txt break.before="1">If the chief executive refuses an application made under section 317, the chief executive must give the applicant an information notice for the decision.</txt></block></clause></division><division id="sec.19-frag-pt.3-div.3" guid="_de336b9b-4ab0-4af6-a99f-8881e38be713" affected.by.uncommenced="0"><no>Division 3</no><heading id="sec.19-frag-pt.3-div.3-he" guid="_aa263d99-aebb-49af-96af-800c720849d9">Other matters</heading><clause id="sec.19-frag-pt.3-div.3-sec.322" guid="_d85e8867-58ba-41ad-b129-c3ee6c34141b" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>322</no><heading id="sec.19-frag-pt.3-div.3-sec.322-he" guid="_b8c4a4b3-635b-440f-b54d-87b11d68e548">Exemption from using weighbridge for stated period in stated circumstances</heading><block><txt break.before="1">Until the end of 30 June 2020, the operator of a waste disposal site is not obliged to use a weighbridge to measure waste or other material as required under section 59 if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.19-frag-pt.3-div.3-sec.322-para1.a" guid="_fecfe7a5-3d26-4da0-8f73-cd7981759eec" provision.type="other"><no>(a)</no><block><txt break.before="0">the operator has, before the commencement, given the chief executive written notice that it is not practicable to use the weighbridge to measure and record waste or other material delivered to the site in a vehicle with a GCM or GVM of 4.5 tonnes or less; and</txt></block></li><li id="sec.19-frag-pt.3-div.3-sec.322-para1.b" guid="_3d5d67bc-541d-4dca-aca5-359295dac85c" provision.type="other"><no>(b)</no><block><txt break.before="0">the notice mentioned in paragraph (a) identifies the site and explains the steps the operator is taking to ensure it will be practicable to use the weighbridge to measure and record waste or other material at the site by 1 July 2020; and</txt></block></li><li id="sec.19-frag-pt.3-div.3-sec.322-para1.c" guid="_1eefea45-0165-4693-ba91-e018c5b09741" provision.type="other"><no>(c)</no><block><txt break.before="0">the waste or other material is moved in a vehicle with a GCM or GVM of 4.5 tonnes or less; and</txt></block></li><li id="sec.19-frag-pt.3-div.3-sec.322-para1.d" guid="_11883bcf-3f65-4729-a0f2-00cb768803bf" provision.type="other"><no>(d)</no><block><txt break.before="0">the operator complies with the weight measurement requirements prescribed by regulation.</txt></block></li></list></block></clause><clause id="sec.19-frag-pt.3-div.3-sec.323" guid="_8f7192e7-ed44-4fe3-9ed9-c4d1de2686a1" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>323</no><heading id="sec.19-frag-pt.3-div.3-sec.323-he" guid="_432406f8-c9b5-4724-a26a-d0b0939379cd">Volumetric survey of levyable waste disposal site to be carried out within stated period</heading><subclause id="sec.19-frag-pt.3-div.3-sec.323-ssec.1" guid="_a35c070b-6020-43b5-acd0-107c02cee328" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">Between <b>1 June 2019 and the end of August 2019, </b>the operator of a levyable waste disposal site in the waste levy zone must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.19-frag-pt.3-div.3-sec.323-ssec.1-para1.a" guid="_d764a5c3-dbb7-4174-8a0b-b6b78b6810e4" provision.type="other"><no>(a)</no><block><txt break.before="0">ensure that a volumetric survey is carried out for—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.19-frag-pt.3-div.3-sec.323-ssec.1-para1.a-para2.i" guid="_c46a70ae-7a5c-41ed-8a27-156d98f24ba9" provision.type="other"><no>(i)</no><block><txt break.before="0">each active landfill cell at the site; and</txt></block></li><li id="sec.19-frag-pt.3-div.3-sec.323-ssec.1-para1.a-para2.ii" guid="_22cdbe5c-2225-4899-8878-752a44e92daa" provision.type="other"><no>(ii)</no><block><txt break.before="0">all stockpiled waste at the site; and</txt></block></li></list></block></li><li id="sec.19-frag-pt.3-div.3-sec.323-ssec.1-para1.b" guid="_8c3e2cde-7418-4556-b143-7f7be8c8e420" provision.type="other"><no>(b)</no><block><txt break.before="0">give the chief executive a copy of the results of the survey in the approved form.</txt></block></li></list></block><penalty id="sec.19-frag-pt.3-div.3-sec.323-ssec.1-pen" guid="_5f49c87f-88ce-42ad-8a8a-abea5c314715"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause id="sec.19-frag-pt.3-div.3-sec.323-ssec.2" guid="_44c97a37-3d7a-49e3-beb7-6a5850db5c41" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The volumetric survey must be carried out in compliance with the requirements prescribed by regulation.</txt></block></subclause><subclause id="sec.19-frag-pt.3-div.3-sec.323-ssec.3" guid="_ae5e8dec-a0ab-46eb-9892-8634417599a6" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The results of the volumetric survey must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.19-frag-pt.3-div.3-sec.323-ssec.3-para1.a" guid="_f5d0697b-c81b-4f6a-a10e-7ea0c2444415" provision.type="other"><no>(a)</no><block><txt break.before="0">be in electronic form; and</txt></block></li><li id="sec.19-frag-pt.3-div.3-sec.323-ssec.3-para1.b" guid="_8f8ea436-3b83-473a-98e7-6ae9ba702e2f" provision.type="other"><no>(b)</no><block><txt break.before="0">include a topographical plan complying with specifications advised by the chief executive; and</txt></block></li><li id="sec.19-frag-pt.3-div.3-sec.323-ssec.3-para1.c" guid="_e519db7d-822c-4069-942a-ac663fa404bc" provision.type="other"><no>(c)</no><block><txt break.before="0">include details of the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.19-frag-pt.3-div.3-sec.323-ssec.3-para1.c-para2.i" guid="_6a1626a7-3d1b-4e1a-9589-03ae22425112" provision.type="other"><no>(i)</no><block><txt break.before="0">the area of the levyable waste disposal site;</txt></block></li><li id="sec.19-frag-pt.3-div.3-sec.323-ssec.3-para1.c-para2.ii" guid="_df62053b-bfb9-489f-9779-5c80db98d04d" provision.type="other"><no>(ii)</no><block><txt break.before="0">the site’s landfill capacity;</txt></block></li><li id="sec.19-frag-pt.3-div.3-sec.323-ssec.3-para1.c-para2.iii" guid="_986fe768-0366-4a43-b985-701e7c933367" provision.type="other"><no>(iii)</no><block><txt break.before="0">the stockpiles of waste at the site; and</txt></block></li></list></block></li><li id="sec.19-frag-pt.3-div.3-sec.323-ssec.3-para1.d" guid="_e062e183-6886-458d-958d-e8832c433a8c" provision.type="other"><no>(d)</no><block><txt break.before="0">be certified as accurate by a surveyor under the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-2003-070" target.version.series="58bf4472-9a2d-4809-9f04-c4ff625373da"><name emphasis="yes">Surveyors Act 2003</name></legref>.</txt></block></li></list></block></subclause><subclause id="sec.19-frag-pt.3-div.3-sec.323-ssec.4" guid="_a0274143-2de7-40bc-9f6c-cf65db9c22cb" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">After carrying out the volumetric survey under this section, the operator must ensure that a copy of the results of the survey is kept as a document in hard copy form at the levyable waste disposal site for at least 5 years after the survey is carried out.</txt></block><penalty id="sec.19-frag-pt.3-div.3-sec.323-ssec.4-pen" guid="_03b7461e-dcbb-4037-949a-595b017ef0aa"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause id="sec.19-frag-pt.3-div.3-sec.323-ssec.5" guid="_05d2ec6d-99af-48f8-9e17-f2802d47c08d" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">Subsections&#160;(6) and (7) apply if the operator of a levyable waste disposal site fails to comply with subsection&#160;(1).</txt></block></subclause><subclause id="sec.19-frag-pt.3-div.3-sec.323-ssec.6" guid="_a40f77b7-a875-48cd-a1a0-42f2ddadcf00" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block><txt break.before="0">The chief executive may arrange for the volumetric survey to be carried out at the site and for that purpose may direct an authorised person to enter the site and carry out the survey.</txt></block></subclause><subclause id="sec.19-frag-pt.3-div.3-sec.323-ssec.7" guid="_c74e353a-7789-4bc6-8780-cb2e9be86a23" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block><txt break.before="0">The chief executive may recover the cost of carrying out the volumetric survey from the operator as a debt payable by the operator to the State.</txt></block></subclause></clause><clause id="sec.19-frag-pt.3-div.3-sec.324" guid="_0bbfe25e-dd3c-4204-a343-fa685c8713ca" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>324</no><heading id="sec.19-frag-pt.3-div.3-sec.324-he" guid="_99ac0d74-1245-41dc-b556-072464baa15e">Volumetric survey of resource recovery area to be carried out within stated period</heading><subclause id="sec.19-frag-pt.3-div.3-sec.324-ssec.1" guid="_1c6ed08c-03fb-46f3-9c44-e07a02baf748" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">Between 1 June 2019 and the end of August 2019<b>, </b>the entity having responsibility for the operation of a resource recovery area for a waste disposal site in the waste levy zone must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.19-frag-pt.3-div.3-sec.324-ssec.1-para1.a" guid="_1cb51dc5-a9fd-4b77-bcbf-af0a4a1076bf" provision.type="other"><no>(a)</no><block><txt break.before="0">ensure that a volumetric survey is carried out for all stockpiled waste at the area; and</txt></block></li><li id="sec.19-frag-pt.3-div.3-sec.324-ssec.1-para1.b" guid="_59247279-aa52-4054-a300-3c0d5784513d" provision.type="other"><no>(b)</no><block><txt break.before="0">give the chief executive a copy of the results of the survey in the approved form.</txt></block></li></list></block><penalty id="sec.19-frag-pt.3-div.3-sec.324-ssec.1-pen" guid="_88dd5c1d-e5cf-43a0-bfa9-5d3f1886cac0"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause id="sec.19-frag-pt.3-div.3-sec.324-ssec.2" guid="_b6b5a4da-7e79-4a6e-9fbc-e478d3281d4d" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">The volumetric survey must be carried out in compliance with the requirements prescribed by regulation.</txt></block></subclause><subclause id="sec.19-frag-pt.3-div.3-sec.324-ssec.3" guid="_0bb53268-7d97-42fd-9b3d-2aa3bd832137" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">The results of the volumetric survey must—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.19-frag-pt.3-div.3-sec.324-ssec.3-para1.a" guid="_f9dea088-c468-4c40-912d-61297ba28d53" provision.type="other"><no>(a)</no><block><txt break.before="0">be in electronic form; and</txt></block></li><li id="sec.19-frag-pt.3-div.3-sec.324-ssec.3-para1.b" guid="_e39bd58c-b6e9-4037-847f-01633b65e42e" provision.type="other"><no>(b)</no><block><txt break.before="0">include a topographical plan complying with specifications advised by the chief executive; and</txt></block></li><li id="sec.19-frag-pt.3-div.3-sec.324-ssec.3-para1.c" guid="_749dac66-8b19-4db9-9260-cb44b4f6ae4e" provision.type="other"><no>(c)</no><block><txt break.before="0">include details of the following—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.19-frag-pt.3-div.3-sec.324-ssec.3-para1.c-para2.i" guid="_455bf08a-e7cf-4246-9a5f-e12517a3a048" provision.type="other"><no>(i)</no><block><txt break.before="0">the area of the resource recovery area;</txt></block></li><li id="sec.19-frag-pt.3-div.3-sec.324-ssec.3-para1.c-para2.ii" guid="_17eaf8c5-724a-4c5d-a3d0-4ce4ffa226cb" provision.type="other"><no>(ii)</no><block><txt break.before="0">the stockpiles of waste at the area; and</txt></block></li></list></block></li><li id="sec.19-frag-pt.3-div.3-sec.324-ssec.3-para1.d" guid="_9ef522c1-d20c-4717-83e1-5b1a8374f04a" provision.type="other"><no>(d)</no><block><txt break.before="0">be certified as accurate by a surveyor under the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-2003-070" target.version.series="58bf4472-9a2d-4809-9f04-c4ff625373da"><name emphasis="yes">Surveyors Act 2003</name></legref>.</txt></block></li></list></block></subclause><subclause id="sec.19-frag-pt.3-div.3-sec.324-ssec.4" guid="_23620874-6ec6-451e-bb4a-810e6f165e1b" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">After carrying out the volumetric survey under this section, the entity must ensure that a copy of the results of the survey is kept as a document in hard copy form at the levyable waste disposal site for at least 5 years after the survey is carried out.</txt></block><penalty id="sec.19-frag-pt.3-div.3-sec.324-ssec.4-pen" guid="_dc648f62-a91d-4de2-a37e-14ff0e339138"><block><txt break.before="1">Maximum penalty—200 penalty units.</txt></block></penalty></subclause><subclause id="sec.19-frag-pt.3-div.3-sec.324-ssec.5" guid="_58867a89-4227-4ee3-bbbc-b93af422a04d" affected.by.uncommenced="0" provision.type="other"><no>(5)</no><block><txt break.before="0">Subsections&#160;(6) and (7) apply if an entity having responsibility for the operation of a resource recovery area fails to comply with subsection&#160;(1).</txt></block></subclause><subclause id="sec.19-frag-pt.3-div.3-sec.324-ssec.6" guid="_0983dda5-2a27-46f5-92f4-64b1119580ca" affected.by.uncommenced="0" provision.type="other"><no>(6)</no><block><txt break.before="0">The chief executive may arrange for the volumetric survey to be carried out at the resource recovery area and for that purpose may direct an authorised person to enter the area and carry out the survey.</txt></block></subclause><subclause id="sec.19-frag-pt.3-div.3-sec.324-ssec.7" guid="_86679f42-d494-463c-a771-f5727ad7c3fb" affected.by.uncommenced="0" provision.type="other"><no>(7)</no><block><txt break.before="0">The chief executive may recover the cost of the volumetric survey from the entity as a debt payable by the entity to the State.</txt></block></subclause></clause><clause id="sec.19-frag-pt.3-div.3-sec.325" guid="_973d6c37-7f41-4284-b53f-04843dcd2f58" affected.by.uncommenced="0" spent.amends="0" provision.type="other"><no>325</no><heading id="sec.19-frag-pt.3-div.3-sec.325-he" guid="_536b7929-b52d-48b1-9197-68bdffdccda9">Temporary relaxation from s&#160;59 measuring requirements for small site</heading><block><txt break.before="0">Until the end of 30 June 2021, the operator of a small site is not obliged to measure waste as required under section 59 if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.19-frag-pt.3-div.3-sec.325-para1.a" guid="_fe3102d8-2f31-4242-8e93-76b31304bc86" provision.type="other"><no>(a)</no><block><txt break.before="0">the operator has, before the commencement, given the chief executive written notice of a proposed alternative methodology for measuring and recording waste at the site; and</txt></block></li><li id="sec.19-frag-pt.3-div.3-sec.325-para1.b" guid="_088af139-d084-4690-889b-9035da0e7f13" provision.type="other"><no>(b)</no><block><txt break.before="0">the notice mentioned in paragraph (a) identifies the site and includes details of the proposed alternative methodology; and</txt></block></li><li id="sec.19-frag-pt.3-div.3-sec.325-para1.c" guid="_0ae8ce4f-cfaf-4adf-9488-a01577243781" provision.type="other"><no>(c)</no><block><txt break.before="0">the proposed alternative methodology enables the operator to fairly work out the total of the waste levy amount owing to the chief executive on waste delivered, or moved from stockpile to landfill, at the site; and</txt></block></li><li id="sec.19-frag-pt.3-div.3-sec.325-para1.d" guid="_cea14dd1-6d1e-462d-a7eb-373a22c2e132" provision.type="other"><no>(d)</no><block><txt break.before="0">the operator is implementing the alternative methodology in accordance with its terms.</txt></block></li></list></block></clause></division></part></fragment></block></clause><clause id="sec.20" guid="_f2fd10a5-3d82-4871-81f7-1000416b0562" affected.by.uncommenced="0" spent.amends="0" provision.type="amend"><no>20</no><heading id="sec.20-he" guid="_8948d8f6-d7a9-41f7-84a4-ae9ff481e816">Amendment of schedule (Dictionary)</heading><subclause id="sec.20-ssec.1" guid="_4ea5a4eb-2b62-44c2-9e10-484cbb31283f" affected.by.uncommenced="0" provision.type="other"><no>(1)</no><block><txt break.before="0">Schedule, definitions <defterm id="sec.20-def.cleanearthenmaterial" guid="_dd01bbb1-0778-475c-91a4-43b005cc6ef0" type="definition">clean earthen material</defterm>, <defterm guid="_a56f4278-b0b5-4bca-a09b-a81b64e1b06e" type="mention">recycling activity</defterm>, <defterm guid="_ad37bb17-d0cf-4659-90ae-4cfb94d34aab" type="mention">reporting period</defterm>, <defterm guid="_8f2265e0-69fd-4630-a79e-23e8758bbd23" type="mention">Waste and Environment Fund</defterm>, <defterm guid="_464bebdf-61f3-4f05-8430-1293cd7f4935" type="mention">waste data return</defterm> and <defterm guid="_98dccac3-5c25-4343-a50c-6cc8679bd6ab" type="mention">weighbridge requirement provision</defterm>—</txt><txt break.before="1"><i>omit</i>.</txt></block></subclause><subclause id="sec.20-ssec.2" guid="_d99af825-6e1e-47d4-a6b2-e06babe3be38" affected.by.uncommenced="0" provision.type="other"><no>(2)</no><block><txt break.before="0">Schedule—</txt><txt break.before="1"><i>insert—</i></txt><fragment format="fromcontext" auto.number.type="manual" style="indent"><block><deflist><definition id="sec.20-ssec.2-frag-def.acidsulfatesoil_" guid="_79eb44ba-7f55-415d-93f4-f9a51d4d6394" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.acidsulfatesoil" guid="_f8730408-5e72-490e-8459-42005e04b251" type="definition">acid sulfate soil</defterm> means soil or sediment containing iron sulfides that produces sulphuric acid when exposed to air.</txt></definition><definition id="sec.20-ssec.2-frag-def.activelandfillcell_" guid="_b882d9a7-3ae3-4a11-b6a4-4fcbbff57947" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.activelandfillcell" guid="_be9d6e2f-f33c-48c3-8030-ee7876cbfed4" type="definition">active landfill cell</defterm> see section 26.</txt></definition><definition id="sec.20-ssec.2-frag-def.baddebtcredit_" guid="_327f16d1-16e3-4faf-a908-1299982d527f" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.baddebtcredit" guid="_d8d965aa-194b-408a-9490-31d0e677ee92" type="definition">bad debt credit</defterm>, for chapter 3, see section 72K(1).</txt></definition><definition id="sec.20-ssec.2-frag-def.baddebtcreditapplication_" guid="_01f0b41e-897c-4c54-9298-7f63eb9ce6e7" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.baddebtcreditapplication" guid="_c6a6d957-56b7-4a89-a6ac-c62a8bd48630" type="definition">bad debt credit application</defterm>, for chapter 3, see section 26.</txt></definition><definition id="sec.20-ssec.2-frag-def.cleanearth_" guid="_b6d3a6dd-9018-4960-a1a9-9edcf5709737" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.cleanearth" guid="_ef76226f-325f-4b3c-9a24-8c51f6087f81" type="definition">clean earth</defterm>— </txt><list number.type="manual" unnumbered.indent="0"><li id="sec.20-ssec.2-frag-def.cleanearth-para1.a" guid="_b9fe9e2f-d9d0-442e-be0e-c389f6867393" provision.type="other"><no>(a)</no><block><txt break.before="0">means earth that is not contaminated with waste or otherwise contaminated with a hazardous contaminant; but</txt></block></li><li id="sec.20-ssec.2-frag-def.cleanearth-para1.b" guid="_06f8cdaf-3bef-4c1c-a5af-8a895df638b1" provision.type="other"><no>(b)</no><block><txt break.before="0">does not include acid sulphate soil, other than acid sulphate soil that—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.20-ssec.2-frag-def.cleanearth-para1.b-para2.i" guid="_99c79077-9e28-43a7-bf39-c26d1f02fafd" provision.type="other"><no>(i)</no><block><txt break.before="0">is not contaminated with waste, or otherwise contaminated with a hazardous contaminant, other than naturally occurring iron sulphides that produce sulphuric acid when exposed to air; and</txt></block></li><li id="sec.20-ssec.2-frag-def.cleanearth-para1.b-para2.ii" guid="_65e7cbe3-314a-4241-b883-c86a20b2b710" provision.type="other"><no>(ii)</no><block><txt break.before="0">has been treated in accordance with best practice environmental management, within the meaning of the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261"><name emphasis="no">Environmental Protection Act</name></legref>, section 21, for the treatment and management of acid sulfate soils, as stated in a guideline prescribed by regulation.</txt></block></li></list></block></li></list></definition><definition id="sec.20-ssec.2-frag-def.contaminatedlandregister_" guid="_790b692d-4b05-438f-8ece-07cd1350ef78" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.contaminatedlandregister" guid="_918cf606-bd66-4652-869f-b8463ec4afd2" type="definition">contaminated land register</defterm> see the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261"><name emphasis="no">Environmental Protection Act</name></legref>, schedule 4.</txt></definition><definition id="sec.20-ssec.2-frag-def.disaster_" guid="_1f452732-514a-454d-8291-2a3b9d28b0bb" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.disaster" guid="_77f8ee7e-9db7-4cca-9aee-cb394451d4a9" type="definition">disaster</defterm>, for chapter 3, see section 26.</txt></definition><definition id="sec.20-ssec.2-frag-def.disastermanagementwaste_" guid="_b5839a8d-245d-4202-ac01-daeed99f3199" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.disastermanagementwaste" guid="_68e29e82-8693-4bac-9d82-6d093d49126d" type="definition">disaster management waste</defterm>, for chapter 3, see section 26.</txt></definition><definition id="sec.20-ssec.2-frag-def.disastersituation_" guid="_1817a1ef-334f-4b56-bf36-ee6831b3102e" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.disastersituation" guid="_bddec38d-0085-4f5b-a68c-6392629984d1" type="definition">disaster situation</defterm>, for chapter 3, see section 26.</txt></definition><definition id="sec.20-ssec.2-frag-def.discountedrate_" guid="_8b7b4a46-e943-40ec-956d-b9d7879bab10" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.discountedrate" guid="_7a1bfcac-c608-49c8-a3ac-4bb378bed001" type="definition">discounted rate</defterm>, for the waste levy for residue waste, see section 44(4).</txt></definition><definition id="sec.20-ssec.2-frag-def.dredgespoil_" guid="_28547d4e-1a54-4199-b827-e14e98ec4482" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.dredgespoil" guid="_88531387-2f6e-466e-83c2-94ebe65b92c5" type="definition">dredge spoil</defterm>, for chapter 3, see section 26.</txt></definition><definition id="sec.20-ssec.2-frag-def.duedateforpayment_" guid="_f92e0484-e06b-4fdf-a81b-c9d52b6e2ac6" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.duedateforpayment" guid="_43ae283b-359a-4dc2-9b21-f88c942ca596" type="definition">due date for payment</defterm>, of a waste levy amount, for chapter 3, see section 26.</txt></definition><definition id="sec.20-ssec.2-frag-def.earth_" guid="_f81b2641-4c4e-4eb9-a9d2-b592a4d96ab2" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.earth" guid="_b8e94e1a-c9b3-497e-a988-ca9b9899189a" type="definition">earth</defterm> means natural materials such as clay, gravel, sand, soil and rock.</txt></definition><definition id="sec.20-ssec.2-frag-def.environmentalmanagementregister_" guid="_43161846-34a6-463f-9cce-5c29bf5d5b35" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.environmentalmanagementregister" guid="_696cda33-cc22-413e-9a61-1a1162976fa2" type="definition">environmental management register</defterm> see the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261"><name emphasis="no">Environmental Protection Act</name></legref>, schedule 4.</txt></definition><definition id="sec.20-ssec.2-frag-def.exemptwaste_" guid="_46fe28d1-6a73-4c19-b916-f7483b13157b" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.exemptwaste" guid="_87883a17-ed5d-4250-bcc4-db5b6aad8c39" type="definition">exempt waste</defterm> see section 26.</txt></definition><definition id="sec.20-ssec.2-frag-def.exemptwasteapplication_" guid="_027631e0-edbc-4e36-ab66-c60f0d76fad7" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.exemptwasteapplication" guid="_543150ce-71c6-4c3b-aaad-d84dec36fae1" type="definition">exempt waste application</defterm>, for chapter 3, see section 26.</txt></definition><definition id="sec.20-ssec.2-frag-def.feedstock_" guid="_32092f5d-e2d2-4304-a721-7bcc13064a1b" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.feedstock" guid="_25af4740-075a-437b-8ced-73442956a455" type="definition">feedstock</defterm>, for a recycling activity, for chapter 3, see section 26.</txt></definition><definition id="sec.20-ssec.2-frag-def.friableasbestoscontainingmaterial_" guid="_4eba8163-2307-4e70-baee-454a2d2f3ca9" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.friableasbestoscontainingmaterial" guid="_850839bb-9a97-4cfe-86df-f0d047c10def" type="definition">friable asbestos-containing material</defterm>, for chapter 3, see section 26.</txt></definition><definition id="sec.20-ssec.2-frag-def.hazardouscontaminant_" guid="_15a56314-02d3-40d0-b1e2-294450042216" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.hazardouscontaminant" guid="_cc78e232-bc5f-44f4-a5e2-d9417d6a9712" type="definition">hazardous contaminant</defterm> see the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261"><name emphasis="no">Environmental Protection Act</name></legref>, schedule 4.</txt></definition><definition id="sec.20-ssec.2-frag-def.lawfullymanagedandtransported_" guid="_e4d347ff-431b-4770-a612-3c98a3b6caf0" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.lawfullymanagedandtransported" guid="_b7746504-fbe9-44d8-8204-130c4f0ffbba" type="definition">lawfully managed and transported</defterm>, for asbestos or waste containing asbestos, for chapter 3, see section 26.</txt></definition><definition id="sec.20-ssec.2-frag-def.levyablewaste_" guid="_b6b68b92-8273-4d05-9364-e8b63eeab81c" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.levyablewaste" guid="_a03f8d6f-776a-4f64-bca1-fed49621932d" type="definition">levyable waste</defterm>, for chapter 3, see section 26.</txt></definition><definition id="sec.20-ssec.2-frag-def.levyablewastedisposalsite_" guid="_e3c665e4-c102-44f0-9640-8fb7b617ae6e" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.levyablewastedisposalsite" guid="_771c42c3-a8d2-4bed-9594-88de38d03250" type="definition">levyable waste disposal site</defterm> see section 26.</txt></definition><definition id="sec.20-ssec.2-frag-def.levyperiod_" guid="_d9c42d35-be39-401b-be2e-c6a2ed9bda83" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.levyperiod" guid="_49683fa7-a517-409e-98ad-0a42b5ce0b10" type="definition">levy period</defterm>, for chapter 3, see section 26.</txt></definition><definition id="sec.20-ssec.2-frag-def.monitoringsystem_" guid="_db75d1f5-0c2f-4dbb-b5b5-e1c6391cf571" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.monitoringsystem" guid="_76db01c2-da84-4f22-a7bc-74935e6f998e" type="definition">monitoring system</defterm>, for chapter 3, see section 62.</txt></definition><definition id="sec.20-ssec.2-frag-def.nonfriableasbestoscontainingmaterial_" guid="_510560b1-943d-4a5c-8305-95fd798dfe47" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.nonfriableasbestoscontainingmaterial" guid="_eca30004-8547-42fa-9ceb-77b78f9274e4" type="definition">non-friable asbestos-containing material</defterm>, for chapter 3, see section 26.</txt></definition><definition id="sec.20-ssec.2-frag-def.nonlevyzone_" guid="_b9e1f44b-ead3-4971-a014-b8d7cf4b4823" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.nonlevyzone" guid="_f1f4a9c2-5a8c-4d80-a900-b502daef82b1" type="definition">non-levy zone</defterm> see section 26.</txt></definition><definition id="sec.20-ssec.2-frag-def.progressivecapping_" guid="_52b61cfc-3117-438f-b800-3722eae90c7e" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.progressivecapping" guid="_ceafec4b-d928-4ae7-a45d-be2bc4b59d1f" type="definition">progressive capping</defterm>, for chapter 3, see section 26.</txt></definition><definition id="sec.20-ssec.2-frag-def.recyclingactivity_" guid="_c7ac4ee6-c26b-4c51-99d8-96a0d7294396" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.recyclingactivity" guid="_75b2e0c6-362a-4b9d-895f-1aecac88cf50" type="definition">recycling activity</defterm> includes—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.20-ssec.2-frag-def.recyclingactivity-para1.a" guid="_a9a3f665-4e4f-4e7e-8ae1-4d43f65f4501" provision.type="other"><no>(a)</no><block><txt break.before="0">re-using waste resources; and</txt></block></li><li id="sec.20-ssec.2-frag-def.recyclingactivity-para1.b" guid="_d1c2c81c-7b5b-49a5-8a58-25882c4f5441" provision.type="other"><no>(b)</no><block><txt break.before="0">recycling waste resources to make the same or different products; and</txt></block></li><li id="sec.20-ssec.2-frag-def.recyclingactivity-para1.c" guid="_f209f267-6630-42ff-89c8-a8a2e2f67f3d" provision.type="other"><no>(c)</no><block><txt break.before="0">recovering waste resources, including extracting energy from those resources.</txt></block></li></list></definition><definition id="sec.20-ssec.2-frag-def.recyclingefficiencythreshold_" guid="_238f9c11-a0f9-41ae-9a77-ff8b918422e8" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.recyclingefficiencythreshold" guid="_a912562f-75dc-411f-853b-ea2b57fd12c8" type="definition">recycling efficiency threshold</defterm> means the percentage of feedstock used for a recycling activity that is not disposed of as landfill as a result of the activity.</txt></definition><definition id="sec.20-ssec.2-frag-def.residuewaste_" guid="_e5c15324-cdfc-464b-ba8f-8df4991922df" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.residuewaste" guid="_f1dac783-53a0-4410-a561-2cd6de0de75d" type="definition">residue waste</defterm> see section 26.</txt></definition><definition id="sec.20-ssec.2-frag-def.residuewastediscountingapplication_" guid="_4f7ce7da-203e-4d90-899c-55495fb92fa9" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.residuewastediscountingapplication" guid="_b18cdf6d-bf41-4dc7-ac0f-5ac3fcef33ba" type="definition">residue waste discounting application</defterm>, for chapter 3, see section 44(1).</txt></definition><definition id="sec.20-ssec.2-frag-def.resourcerecoveryarea_" guid="_2cde30e9-3c19-4165-bd45-8cd6f5fdbc62" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.resourcerecoveryarea" guid="_be923572-fa11-4ec5-814e-599241df818b" type="definition">resource recovery area</defterm> see section 72R.</txt></definition><definition id="sec.20-ssec.2-frag-def.section325smallsite_" guid="_7e329d02-0ef5-4fe9-947e-fda7522b8687" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.section325smallsite" guid="_8b5c0c26-bc8a-4fad-a9bb-88c1b9db2aff" type="definition">section 325 small site</defterm>, for chapter 3, see section 26.</txt></definition><definition id="sec.20-ssec.2-frag-def.seriouslocalevent_" guid="_80721e84-042e-4f33-9ce5-8e157c11bf6f" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.seriouslocalevent" guid="_c9ccb619-7113-4d5a-b8a5-046e85e08454" type="definition">serious local event</defterm>, for chapter 3, see section 26.</txt></definition><definition id="sec.20-ssec.2-frag-def.seriouslocaleventwaste_" guid="_1902a807-593f-4e8d-821a-dc20fe1dd3e0" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.seriouslocaleventwaste" guid="_d1d4a509-bf30-45e5-a47a-56201bd3c161" type="definition">serious local event waste</defterm>, for chapter 3, see section 26.</txt></definition><definition id="sec.20-ssec.2-frag-def.smallsite_" guid="_f6facde2-66b3-4288-ae05-485ce9ba6810" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.smallsite" guid="_69635005-d5a3-4c85-8145-26fedd4e0da3" type="definition">small site</defterm> see section 26.</txt></definition><definition id="sec.20-ssec.2-frag-def.wastedatareturn_" guid="_d9860121-b189-4d62-b2f7-468611f75c8c" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.wastedatareturn" guid="_00ffb705-5621-4d5d-98e8-44d7e3787b0a" type="definition">waste data return</defterm>, for chapter 3, see section 72(1).</txt></definition><definition id="sec.20-ssec.2-frag-def.wastelevy_" guid="_38d73267-c3e9-4aab-a716-ee3fcfe49a60" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.wastelevy" guid="_ce3941e0-8b2b-4ebb-8052-68a83fd8a621" type="definition">waste levy</defterm> see section 36.</txt></definition><definition id="sec.20-ssec.2-frag-def.wastelevyamount_" guid="_f9889547-25d1-4770-864b-dff538085a97" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.wastelevyamount" guid="_7047654a-d860-47ab-9ca1-914c1844dc18" type="definition">waste levy amount</defterm> see section 26.</txt></definition><definition id="sec.20-ssec.2-frag-def.wastelevyinstalmentagreement_" guid="_60a11a3d-09b2-4a02-b4b7-bfdb96889b6b" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.wastelevyinstalmentagreement" guid="_136e4d5a-41b6-479e-bf2a-40d0ad1ec780" type="definition">waste levy instalment agreement</defterm>, for chapter 3, see section 72B(1).</txt></definition><definition id="sec.20-ssec.2-frag-def.wastelevyzone_" guid="_2898ba9f-84de-4afc-8c26-286a808fa321" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.wastelevyzone" guid="_473398d7-4655-4375-beed-f5a9f6174306" type="definition">waste levy zone</defterm> see section 26.</txt></definition><definition id="sec.20-ssec.2-frag-def.weightmeasurementcriteria_" guid="_f1509c89-acad-417d-84fa-a4b9c2e1f3ab" affected.by.uncommenced="0"><txt break.before="1"><defterm id="sec.20-ssec.2-frag-def.weightmeasurementcriteria" guid="_a8655524-b43b-4621-bb69-105fc855c031" type="definition">weight measurement criteria</defterm>, for chapter 3, see section 26.</txt></definition></deflist></block></fragment></block></subclause><subclause id="sec.20-ssec.3" guid="_4809df7f-f334-452b-8e9b-0b0c6c7a3d68" affected.by.uncommenced="0" provision.type="other"><no>(3)</no><block><txt break.before="0">Schedule, definition <defterm guid="_06f93bad-a0ba-4546-86d2-19ceb9425123" type="mention">waste facility</defterm>, paragraph 2—</txt><txt break.before="1"><i>omit, insert—</i></txt><fragment format="fromcontext" auto.number.type="manual" style="indent"><list number.type="manual" unnumbered.indent="0"><li id="sec.20-ssec.3-frag-para1.2" guid="_9efa06f1-4f98-4e79-8c49-b79dc0d9055c" provision.type="other"><no>2</no><block><txt break.before="0">However, a <defterm guid="_77c7ba87-34c2-42bb-8b3c-fd41727e454e" type="mention">waste facility</defterm> does not include any of the following facilities—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.20-ssec.3-frag-para1.2-para2.a" guid="_529f1f89-9b4c-483f-9de3-3fc4a5d0f7c0" provision.type="other"><no>(a)</no><block><txt break.before="0">a facility that is lawfully operated for the sole purpose of disposing of waste generated by an environmentally relevant activity carried out under the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261"><name emphasis="no">Environmental Protection Act</name></legref> if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.20-ssec.3-frag-para1.2-para2.a-para3.i" guid="_fc9518fc-3b77-407e-81fe-51261204a3ae" provision.type="other"><no>(i)</no><block><txt break.before="0">the waste is or was generated only by, and its generation is or was ancillary to, the operation of the activity; and</txt></block></li><li id="sec.20-ssec.3-frag-para1.2-para2.a-para3.ii" guid="_d710d07e-b7d9-4130-93a6-01d8be053f53" provision.type="other"><no>(ii)</no><block><txt break.before="0">the activity is not a waste management ERA; and</txt></block></li><li id="sec.20-ssec.3-frag-para1.2-para2.a-para3.iii" guid="_02010746-b76f-422e-bfe9-cd6df4af9af2" provision.type="other"><no>(iii)</no><block><txt break.before="0">the facility is operated by or for the entity carrying out the activity; and</txt></block></li><li id="sec.20-ssec.3-frag-para1.2-para2.a-para3.iv" guid="_dee96a73-14b5-44df-92c2-262e5155f70d" provision.type="other"><no>(iv)</no><block><txt break.before="0">the facility is authorised under the same environmental authority as the activity;</txt></block></li></list></block></li><li id="sec.20-ssec.3-frag-para1.2-para2.b" guid="_bc9b39ec-52a4-44b0-b617-afa1d9d5572d" provision.type="other"><no>(b)</no><block><txt break.before="0">a facility that is lawfully operated for the sole purpose of disposing of waste generated by 1 or more resource activities carried out under the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261"><name emphasis="no">Environmental Protection Act</name></legref> if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.20-ssec.3-frag-para1.2-para2.b-para3.i" guid="_8cd73557-47ec-40a4-9d53-67ba08060390" provision.type="other"><no>(i)</no><block><txt break.before="0">the waste is or was generated only by, and its generation is or was ancillary to, the operation of 1 or more of the resource activities; and</txt></block></li><li id="sec.20-ssec.3-frag-para1.2-para2.b-para3.ii" guid="_cc8447ef-bfcd-41d1-a393-073eabbfc3dc" provision.type="other"><no>(ii)</no><block><txt break.before="0">the facility is operated by or for an entity carrying out 1 or more of the resource activities; and</txt></block></li><li id="sec.20-ssec.3-frag-para1.2-para2.b-para3.iii" guid="_0a823e9c-45cd-4689-857c-29fef70dadc2" provision.type="other"><no>(iii)</no><block><txt break.before="0">the facility is authorised under the same environmental authority as 1 of the resource activities;</txt></block></li></list></block></li><li id="sec.20-ssec.3-frag-para1.2-para2.c" guid="_2456ab41-b190-4ddd-93af-963fa48756d9" provision.type="other"><no>(c)</no><block><txt break.before="0">a facility that is lawfully operated for the sole purpose of disposing of waste generated by the processing, handling, storage or transport of materials from a resource activity carried out under the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261"><name emphasis="no">Environmental Protection Act</name></legref> if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.20-ssec.3-frag-para1.2-para2.c-para3.i" guid="_cda8474c-85a3-49a5-8b77-937ea6cf55a8" provision.type="other"><no>(i)</no><block><txt break.before="0">the waste is or was generated only by, and its generation is or was ancillary to, the processing, handling, storage or transport of the materials from the resource activity; and</txt></block></li><li id="sec.20-ssec.3-frag-para1.2-para2.c-para3.ii" guid="_d29164b1-714f-4ded-b18b-4383947633f2" provision.type="other"><no>(ii)</no><block><txt break.before="0">the facility is operated by or for the entity carrying out the resource activity; and</txt></block></li><li id="sec.20-ssec.3-frag-para1.2-para2.c-para3.iii" guid="_d90cd634-5cc7-455f-83b0-aabcc0a9696b" provision.type="other"><no>(iii)</no><block><txt break.before="0">the facility is authorised under the same environmental authority as the resource activity;</txt></block></li></list></block></li><li id="sec.20-ssec.3-frag-para1.2-para2.d" guid="_2ff026b0-3ac2-4a15-8563-9e083b1aad21" provision.type="other"><no>(d)</no><block><txt break.before="0">a facility that is lawfully operated for the sole purpose of disposing of waste generated to remediate contaminated land recorded in the environmental management register or contaminated land register if—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.20-ssec.3-frag-para1.2-para2.d-para3.i" guid="_b560967e-bb21-4714-bd92-df885bf4a787" provision.type="other"><no>(i)</no><block><txt break.before="0">the waste was generated by an activity (the <defterm id="sec.20-ssec.3-frag-para1.2-para2.d-def.initialactivity" guid="_6155e46e-aeb7-458b-a570-33d2e6bac84f" type="definition">initial activity</defterm>) lawfully carried out on the contaminated land before the initial activity became an environmentally relevant activity under the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261"><name emphasis="no">Environmental Protection Act</name></legref> (the <defterm id="sec.20-ssec.3-frag-para1.2-para2.d-def.relevantactivity" guid="_4cd9864f-cda7-41bc-b0b0-50a5611f1c8d" type="definition">relevant activity</defterm>); and</txt></block></li><li id="sec.20-ssec.3-frag-para1.2-para2.d-para3.ii" guid="_97153904-8063-437b-8b21-6fb631c2b946" provision.type="other"><no>(ii)</no><block><txt break.before="0">from the day the initial activity became the relevant activity, the waste is or was generated by the relevant activity carried out on the contaminated land; and</txt></block></li><li id="sec.20-ssec.3-frag-para1.2-para2.d-para3.iii" guid="_7eae3236-e39f-4bfa-a51d-fba1ac526bd3" provision.type="other"><no>(iii)</no><block><txt break.before="0">all of the following apply—</txt><list number.type="manual" unnumbered.indent="0"><li id="sec.20-ssec.3-frag-para1.2-para2.d-para3.iii-para4.A" guid="_ba2215f9-8fb5-47c0-944c-9e3839f570ad" provision.type="other"><no>(A)</no><block><txt break.before="0">the waste is or was generated only by, and its generation is or was ancillary to, the operation of the initial activity or relevant activity;</txt></block></li><li id="sec.20-ssec.3-frag-para1.2-para2.d-para3.iii-para4.B" guid="_42aa8ac0-6036-423c-8ae2-ac4c565a19a8" provision.type="other"><no>(B)</no><block><txt break.before="0">the relevant activity is not a resource activity under the <legref jurisd="QLD" type="act" check="valid" target.doc.id="act-1994-062" target.version.series="e86d14b2-a55d-4639-9649-bd989eb91261"><name emphasis="no">Environmental Protection Act</name></legref> or a waste management ERA;</txt></block></li><li id="sec.20-ssec.3-frag-para1.2-para2.d-para3.iii-para4.C" guid="_6dab39b5-f067-45b9-9e01-145cc2fc4140" provision.type="other"><no>(C)</no><block><txt break.before="0">the facility is operated by or for the entity carrying out the relevant activity;</txt></block></li><li id="sec.20-ssec.3-frag-para1.2-para2.d-para3.iii-para4.D" guid="_aa4cd8e5-4018-4943-ba2d-79411389026b" provision.type="other"><no>(D)</no><block><txt break.before="0">the facility is authorised under the same environmental authority as the relevant activity.</txt></block></li></list></block></li></list></block></li></list></block></li></list></fragment></block></subclause><subclause id="sec.20-ssec.4" guid="_088bf85d-4472-4f15-8a66-593506677bea" affected.by.uncommenced="0" provision.type="other"><no>(4)</no><block><txt break.before="0">Schedule, definition <defterm guid="_81d5990c-f839-4cd8-b4ec-941f32d7506c" type="mention">waste management ERA</defterm>, <legref target.doc.id="act-2011-031" refid="sec.20-ssec.4-para1.b" type="act" check="invalid" jurisd="QLD">paragraphs&#160;(b)</legref> to <legref target.doc.id="act-2011-031" refid="sec.20-ssec.4-para1.m" type="act" check="invalid" jurisd="QLD">(m)</legref>—</txt><txt break.before="1"><i>omit, insert—</i></txt><fragment format="fromcontext" auto.number.type="manual" style="indent"><block><list number.type="manual" unnumbered.indent="0"><li id="sec.20-ssec.4-frag-para1.b" guid="_b2e305d2-57e2-4b52-ae73-cafca4eed247" provision.type="other"><no>(b)</no><block><txt break.before="0">mechanically crushing, milling, grinding, shredding or sorting waste;</txt></block></li><li id="sec.20-ssec.4-frag-para1.c" guid="_6dfb5b2a-2873-4816-b295-4b024f5626e4" provision.type="other"><no>(c)</no><block><txt break.before="0">mechanically reprocessing waste;</txt></block></li><li id="sec.20-ssec.4-frag-para1.d" guid="_8f82527e-3065-4647-81ac-5ab2753cb083" provision.type="other"><no>(d)</no><block><txt break.before="0">battery recycling;</txt></block></li><li id="sec.20-ssec.4-frag-para1.e" guid="_613508c4-a8cd-42ed-86a4-ca23e2e3d197" provision.type="other"><no>(e)</no><block><txt break.before="0">composting organic material, anaerobically digesting organic material or manufacturing soil conditioner;</txt></block></li><li id="sec.20-ssec.4-frag-para1.f" guid="_bbbd6c50-7779-4cd6-bfce-f7953cdf255f" provision.type="other"><no>(f)</no><block><txt break.before="0">waste reprocessing or treatment;</txt></block></li><li id="sec.20-ssec.4-frag-para1.g" guid="_cbd48573-dede-485f-bec6-6dda6e114fcb" provision.type="other"><no>(g)</no><block><txt break.before="0">waste storage;</txt></block></li><li id="sec.20-ssec.4-frag-para1.h" guid="_c9533c5c-d86b-4917-9ff5-274d5dfa7d84" provision.type="other"><no>(h)</no><block><txt break.before="0">regulated waste transport;</txt></block></li><li id="sec.20-ssec.4-frag-para1.i" guid="_1cdbd771-9e61-4d87-b0d2-30e052c0e38b" provision.type="other"><no>(i)</no><block><txt break.before="0">regulated waste treatment;</txt></block></li><li id="sec.20-ssec.4-frag-para1.j" guid="_60709d89-dabb-4e6e-b838-67b5e56ebca7" provision.type="other"><no>(j)</no><block><txt break.before="0">tyre recycling;</txt></block></li><li id="sec.20-ssec.4-frag-para1.k" guid="_f5563a38-19f5-4806-b5cb-4f7581bce406" provision.type="other"><no>(k)</no><block><txt break.before="0">waste disposal;</txt></block></li><li id="sec.20-ssec.4-frag-para1.l" guid="_4e4ec0b0-57b2-48bd-a83a-24e5a34be510" provision.type="other"><no>(l)</no><block><txt break.before="0">waste incineration, thermal waste reprocessing or thermal treatment;</txt></block></li><li id="sec.20-ssec.4-frag-para1.m" guid="_85fe528a-003b-40a6-90b1-0e10843bd947" provision.type="other"><no>(m)</no><block><txt break.before="0">operating a waste transfer station or resource recovery facility;</txt></block></li><li id="sec.20-ssec.4-frag-para1.n" guid="_91b2badd-1928-4645-b4b6-815ff3d7131b" provision.type="other"><no>(n)</no><block><txt break.before="0">maintaining a decommissioned waste disposal facility.</txt></block></li></list></block></fragment></block><block><table frame="none" colsep="0" rowsep="0" orient="port" id="sec.20-ssec.4-tbl" guid="_5d6fe4e8-9a8b-461f-aa4b-09f7ffbdee73" heading.align="left" font.size="12.pt"><tgroup cols="1" colsep="0" rowsep="0" tgroupstyle="Tables"><colspec colnum="1" colname="1" colwidth="2.606in" colsep="0"/><tbody><row rowsep="0" id="sec.20-ssec.4-tbl-tblr" guid="_ef1f4003-31c5-4337-893b-add985339fe8"><entry colname="1" align="center" id="sec.20-ssec.4-tbl-tblr-tble1" guid="_730d9286-4642-4b28-b76e-a6a8b7ffd429"><txt break.before="1">&#169; State of Queensland 2019</txt></entry></row></tbody></tgroup></table></block></subclause></clause></part></body></wrapper></act>